PRIOR PRINTER'S NO. 34 PRINTER'S NO. 757
No. 30 Session of 1997
INTRODUCED BY GEIST AND BATTISTO, JANUARY 27, 1997
AS REPORTED FROM COMMITTEE ON TRANSPORTATION, HOUSE OF REPRESENTATIVES, AS AMENDED, MARCH 10, 1997
A SUPPLEMENT 1 To the act of December 8, 1982 (P.L.848, No.235), entitled "An 2 act providing for the adoption of capital projects related to 3 the repair, rehabilitation or replacement of highway bridges 4 to be financed from current revenue or by the incurring of 5 debt and capital projects related to highway and safety 6 improvement projects to be financed from current revenue of 7 the Motor License Fund," itemizing a local bridge project <-- 8 LOCAL AND STATE BRIDGE PROJECTS. <-- 9 The General Assembly of the Commonwealth of Pennsylvania 10 hereby enacts as follows: 11 Section 1. Short title. 12 This act shall be known and may be cited as the Highway- 13 Railroad and Highway Bridge Capital Budget Supplemental Act for 14 1995-1996 1996-1997. <-- 15 Section 2. Definitions. 16 The following words and phrases when used in this act shall 17 have the meanings given to them in this section unless the 18 context clearly indicates otherwise: 19 "Account." The Highway Bridge Improvement Restricted Account 20 within the Motor License Fund.
1 "Capital project." A capital project as defined in section 2 1602-B of the act of April 9, 1929 (P.L.343, No.176), known as 3 The Fiscal Code, and shall include a county or municipal bridge 4 rehabilitation, replacement or improvement project as set forth 5 in this act. 6 "Department." The Department of Transportation of the 7 Commonwealth. 8 "Secretary." The Secretary of Transportation of the 9 Commonwealth. 10 Section 3. Total authorization for bridge projects. 11 (a) Total projects.--The total authorization for the costs 12 of the projects itemized pursuant to this act and to be financed 13 from current revenue or by the incurring of debt shall be 14 $7,407,000 $1,183,601,000. <-- 15 (b) State projects.--The authorization for capital projects 16 in the category of highway STATE BRIDGE projects to be <-- 17 constructed by the Department of Transportation, its OR THE <-- 18 DEPARTMENT OF CONSERVATION AND NATURAL RESOURCES, THEIR 19 successors or assigns, and to be financed by the incurring of 20 debt or from the highway account, itemized in this act under the 21 category of State bridges, shall be $3,598,000 $890,520,000. <-- 22 (c) Non-State projects.--The authorization for non-State 23 highway bridge projects to be constructed by municipalities and 24 to be financed in part with grants not exceeding 80% of the non- 25 Federal share of the costs made to the local government 26 municipalities by the department from revenues deposited in the 27 account itemized in this act under the category of local 28 bridges, shall be $3,809,000 $293,081,000. <-- 29 Section 4. Itemization of bridge projects. 30 The individual capital projects in the category of highway <-- 19970H0030B0757 - 2 -
1 BRIDGE projects to be constructed by the Department of <--
2 Transportation, its successors or assigns, and to be financed
3 from current revenue or by the incurring of debt are hereby
4 itemized, together with their estimated financial costs, in the
5 following sections.
6 Section 5. Adams County (Reserved). <--
7 SECTION 5. ADAMS COUNTY. <--
8 (A) LOCAL BRIDGES
9 (1) CUMBERLAND TOWNSHIP, T-338, HERR'S
10 RIDGE ROAD BRIDGE OVER WILLOUGHBY RUN,
11 BRIDGE REHABILITATION 170,000
12 (BASE CONSTRUCTION ALLOCATION -
13 $100,000)
14 (LAND ALLOCATION - $10,000)
15 (DESIGN AND CONTINGENCIES - $60,000)
16 (2) CUMBERLAND TOWNSHIP, T-402, HORNER
17 ROAD BRIDGE OVER MARSH CREEK, COUNTY
18 BRIDGE NO.111, BRIDGE REPLACEMENT 1,075,000
19 (BASE CONSTRUCTION ALLOCATION -
20 $725,000)
21 (LAND ALLOCATION - $25,000)
22 (DESIGN AND CONTINGENCIES - $325,000)
23 (3) CUMBERLAND TOWNSHIP, T-417, GOULDEN
24 ROAD BRIDGE OVER ROCK CREEK, COUNTY
25 BRIDGE NO.123, BRIDGE REHABILITATION 330,000
26 (BASE CONSTRUCTION ALLOCATION -
27 $250,000)
28 (LAND ALLOCATION - $5,000)
29 (DESIGN AND CONTINGENCIES - $75,000)
30 (4) CUMBERLAND AND FREEDOM TOWNSHIPS,
19970H0030B0757 - 3 -
1 SACH'S MILL COVERED BRIDGE OVER MARSH 2 CREEK, PEDESTRIAN BRIDGE, BRIDGE 3 REHABILITATION 600,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $500,000) 6 DESIGN AND CONTINGENCIES - $100,000 7 (B) STATE BRIDGES (RESERVED) 8 Section 6. Allegheny County. 9 (a) Local Bridges 10 (1) Plum Borough, Mary Street Bridge over 11 Plum Creek, Bridge Replacement 630,000 12 (Base Construction Allocation - 13 $400,000) 14 (Land Allocation - $50,000) 15 (Design and Contingencies - $180,000) 16 (b) State Bridges (Reserved) <-- 17 Section 7. Armstrong County (Reserved). 18 Section 8. Beaver County (Reserved). 19 Section 9. Bedford County (Reserved). 20 Section 10. Berks County (Reserved). 21 (2) CITY OF PITTSBURGH, GLENWOOD BRIDGE, <-- 22 PHASE II OVER MONONGAHELA RIVER, THREE 23 RAILROADS AND CARSON STREET, BRIDGE 24 REHABILITATION 4,180,000 25 (BASE CONSTRUCTION ALLOCATION - 26 $3,905,000) 27 (DESIGN AND CONTINGENCIES - $275,000) 28 (3) ELIZABETH TOWNSHIP, PATTERSON ROAD, 29 BOYD HOLLOW BRIDGE, BRIDGE REPLACEMENT 225,000 30 (BASE CONSTRUCTION ALLOCATION - 19970H0030B0757 - 4 -
1 $180,000) 2 (LAND ALLOCATION - $11,000) 3 (DESIGN AND CONTINGENCIES - $34,000) 4 (4) ELIZABETH TOWNSHIP, YATES STREET 5 BRIDGE, BRIDGE REPLACEMENT 198,000 6 (BASE CONSTRUCTION ALLOCATION - 7 $158,000) 8 (LAND ALLOCATION - $10,000) 9 (DESIGN AND CONTINGENCIES - $30,000) 10 (5) SHALER TOWNSHIP, SOUTH OF MARTHA 11 AVENUE, ANDERSON ROAD OVER WIBLE RUN, 12 BRIDGE REPLACEMENT 500,000 13 (BASE CONSTRUCTION ALLOCATION - 14 $400,000) 15 (DESIGN AND CONTINGENCIES - $100,000) 16 (6) BALDWIN BOROUGH, OLD CLAIRTON ROAD 17 OVER CSX RAILROAD, BRIDGE 18 REHABILITATION 80,000 19 (BASE CONSTRUCTION ALLOCATION - 20 $65,000) 21 (DESIGN AND CONTINGENCIES - $15,000) 22 (7) BEN AVON BOROUGH, SPRUCE RUN ROAD OVER 23 SPRUCE RUN, BRIDGE REHABILITATION 265,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $200,000) 26 (LAND ALLOCATION - $5,000) 27 (DESIGN AND CONTINGENCIES - $60,000) 28 (8) CITY OF PITTSBURGH, SWINBURNE STREET, 29 BRIDGE PAINTING 1,530,000 30 (BASE CONSTRUCTION ALLOCATION - 19970H0030B0757 - 5 -
1 $1,500,000) 2 (DESIGN AND CONTINGENCIES - $30,000) 3 (9) CITY OF PITTSBURGH, RAILROAD BRIDGE 4 (HOT METAL BRIDGE) AT FORMER LTV STEEL 5 COMPANY OVER MONONGAHELA RIVER, BRIDGE 6 REHABILITATION 25,000,000 7 (BASE CONSTRUCTION ALLOCATION - 8 $22,500,000) 9 (DESIGN AND CONTINGENCIES - $2,500,000) 10 (10) EDGEWORTH BOROUGH, BEAVER STREET OVER 11 LITTLE SEWICKLEY CREEK, BRIDGE 12 REPLACEMENT 358,000 13 (BASE CONSTRUCTION ALLOCATION - 14 $250,000) 15 (LAND ALLOCATION - $8,000) 16 (DESIGN AND CONTINGENCIES - $100,000) 17 (11) FORWARD TOWNSHIP, PANGBURN HOLLOW 18 ROAD OVER PANGBURN RUN, BRIDGE 19 REPLACEMENT 200,000 20 (BASE CONSTRUCTION ALLOCATION - 21 $150,000) 22 (LAND ALLOCATION - $10,000) 23 (DESIGN AND CONTINGENCIES - $40,000) 24 (12) HAMPTON TOWNSHIP, DUNCAN AVENUE OVER 25 PINE CREEK, BRIDGE REPLACEMENT 200,000 26 (BASE CONSTRUCTION ALLOCATION - 27 $150,000) 28 (LAND ALLOCATION - $10,000) 29 (DESIGN AND CONTINGENCIES - $40,000) 30 (13) HARRISON TOWNSHIP, NATRONA ROAD OVER 19970H0030B0757 - 6 -
1 SMALL BRANCH OF ALLEGHENY RIVER, BRIDGE 2 REHABILITATION 210,000 3 (BASE CONSTRUCTION ALLOCATION - 4 $160,000) 5 (LAND ALLOCATION - $10,000) 6 (DESIGN AND CONTINGENCIES - $40,000) 7 (14) JEFFERSON BOROUGH, COAL VALLEY ROAD 8 BRIDGE NO.2 OVER MCROBERTS RUN, BRIDGE 9 REHABILITATION 200,000 10 (BASE CONSTRUCTION ALLOCATION - 11 $150,000) 12 (LAND ALLOCATION - $10,000) 13 (DESIGN AND CONTINGENCIES - $40,000) 14 (15) JEFFERSON BOROUGH, COAL VALLEY ROAD 15 BRIDGE NO.4 OVER MCROBERTS RUN, BRIDGE 16 REHABILITATION 200,000 17 (BASE CONSTRUCTION ALLOCATION - 18 $150,000) 19 (LAND ALLOCATION - $10,000) 20 (DESIGN AND CONTINGENCIES - $40,000) 21 (16) LEETSDALE BOROUGH, BEAVER ROAD OVER 22 BIG SEWICKLEY CREEK, BRIDGE 23 REPLACEMENT 420,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $300,000) 26 (LAND ALLOCATION - $10,000) 27 (DESIGN AND CONTINGENCIES - $110,000) 28 (17) MUNICIPALITY OF PENN HILLS, MT. 29 CARMEL ROAD OVER SANDY CREEK, BRIDGE 30 REPLACEMENT 230,000 19970H0030B0757 - 7 -
1 (BASE CONSTRUCTION ALLOCATION - 2 $170,000) 3 (LAND ALLOCATION - $10,000) 4 (DESIGN AND CONTINGENCIES - $50,000) 5 (18) MUNICIPALITY OF PENN HILLS, LINCOLN 6 ROAD BRIDGE NO.6 OVER SANDY CREEK, 7 BRIDGE REPLACEMENT 215,000 8 (BASE CONSTRUCTION ALLOCATION - 9 $150,000) 10 (LAND ALLOCATION - $5,000) 11 (DESIGN AND CONTINGENCIES - $60,000) 12 (19) MUNICIPALITY OF PENN HILLS, LINCOLN 13 ROAD BRIDGE NO.12 OVER SANDY CREEK, 14 BRIDGE REPLACEMENT 215,000 15 (BASE CONSTRUCTION ALLOCATION - 16 $150,000) 17 (LAND ALLOCATION - $5,000) 18 (DESIGN AND CONTINGENCIES - $60,000) 19 (20) SEWICKLEY HEIGHTS BOROUGH, BLACKBURN 20 ROAD OVER KILBUCK RUN, BRIDGE 21 REHABILITATION 145,000 22 (BASE CONSTRUCTION ALLOCATION - 23 $110,000) 24 (LAND ALLOCATION - $5,000) 25 (DESIGN AND CONTINGENCIES - $30,000) 26 (21) SOUTH PARK TOWNSHIP, SLEEPY HOLLOW 27 ROAD OVER SLEEPY HOLLOW, BRIDGE 28 REPLACEMENT 295,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $200,000) 19970H0030B0757 - 8 -
1 (LAND ALLOCATION - $5,000) 2 (DESIGN AND CONTINGENCIES - $90,000) 3 (22) SOUTH PARK TOWNSHIP, COCHRAN'S MILL 4 ROAD OVER LICKS RUN, BRIDGE 5 REPLACEMENT 215,000 6 (BASE CONSTRUCTION ALLOCATION - 7 $150,000) 8 (LAND ALLOCATION - $5,000) 9 (DESIGN AND CONTINGENCIES - $60,000) 10 (23) HAMPTON TOWNSHIP, T-357, BRIDGE OVER 11 GOURDHEAD RUN, BRIDGE REHABILITATION 320,000 12 (BASE CONSTRUCTION ALLOCATION - 13 $280,000) 14 (DESIGN AND CONTINGENCIES - $40,000) 15 (24) HAMPTON TOWNSHIP, T-984, SOUTH 16 PIONEER ROAD BRIDGE NO.1 OVER CROUSE 17 RUN, BRIDGE REHABILITATION 250,000 18 (BASE CONSTRUCTION ALLOCATION - 19 $210,000) 20 (DESIGN AND CONTINGENCIES - $40,000) 21 (25) HAMPTON TOWNSHIP, T-984, SOUTH 22 PIONEER ROAD BRIDGE NO.2 OVER CROUSE 23 RUN, BRIDGE REHABILITATION 250,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $210,000) 26 (DESIGN AND CONTINGENCIES - $40,000) 27 (26) MARSHALL TOWNSHIP, T-482, NORTHGATE 28 DRIVE BRIDGE OVER BRUSH CREEK, BRIDGE 29 REPLACEMENT 320,000 30 (BASE CONSTRUCTION ALLOCATION - 19970H0030B0757 - 9 -
1 $280,000) 2 (LAND ALLOCATION - $5,000) 3 (DESIGN AND CONTINGENCIES - $35,000) 4 (27) TOWN OF MCCANDLESS, BLAZIER DRIVE 5 BRIDGE NO.1 OVER PINE CREEK, BRIDGE 6 REHABILITATION 17,000 7 (BASE CONSTRUCTION ALLOCATION - 8 $15,000) 9 (DESIGN AND CONTINGENCIES - $2,000) 10 (28) TOWN OF MCCANDLESS, BLAZIER DRIVE 11 BRIDGE NO.2 OVER PINE CREEK, BRIDGE 12 REHABILITATION 28,000 13 (BASE CONSTRUCTION ALLOCATION - 14 $26,000) 15 (DESIGN AND CONTINGENCIES - $2,000) 16 (29) TOWN OF MCCANDLESS, BLAZIER DRIVE 17 BRIDGE NO.3 OVER PINE CREEK, BRIDGE 18 REHABILITATION 3,000 19 (BASE CONSTRUCTION ALLOCATION - $2,000) 20 (DESIGN AND CONTINGENCIES - $1,000) 21 (30) TOWN OF MCCANDLESS, OAKRIDGE DRIVE 22 OVER PINE CREEK, BRIDGE REHABILITATION 10,000 23 (BASE CONSTRUCTION ALLOCATION - $8,000) 24 (DESIGN AND CONTINGENCIES - $2,000) 25 (31) TOWN OF MCCANDLESS, MEINERT ROAD OVER 26 PINE CREEK, BRIDGE REHABILITATION 3,000 27 (BASE CONSTRUCTION ALLOCATION - $2,000) 28 (DESIGN AND CONTINGENCIES - $1,000) 29 (32) COLLIER TOWNSHIP, THOM'S RUN ROAD- 30 OAKDALE ROAD NO.4 OVER THOM'S RUN, 19970H0030B0757 - 10 -
1 BRIDGE REPLACEMENT 210,000 2 (BASE CONSTRUCTION ALLOCATION - 3 $160,000) 4 (LAND ALLOCATION - $10,000) 5 (DESIGN AND CONTINGENCIES - $40,000) 6 (33) COLLIER TOWNSHIP, THOM'S RUN ROAD- 7 OAKDALE ROAD NO.5 OVER THOM'S RUN, 8 BRIDGE REPLACEMENT 210,000 9 (BASE CONSTRUCTION ALLOCATION - 10 $160,000) 11 (LAND ALLOCATION - $10,000) 12 (DESIGN AND CONTINGENCIES - $40,000) 13 (34) COLLIER TOWNSHIP, THOM'S RUN ROAD- 14 OAKDALE ROAD NO.9 OVER THOM'S RUN, 15 BRIDGE REPLACEMENT 180,000 16 (BASE CONSTRUCTION ALLOCATION - 17 $130,000) 18 (LAND ALLOCATION - $10,000) 19 (DESIGN AND CONTINGENCIES - $40,000) 20 (35) ETNA BOROUGH, DEWEY STREET OVER 21 LITTLE PINE CREEK, BRIDGE 22 REHABILITATION 23,000 23 (BASE CONSTRUCTION ALLOCATION - 24 $20,000) 25 (DESIGN AND CONTINGENCIES - $3,000) 26 (36) FORWARD TOWNSHIP, ROBERTS HOLLOW ROAD 27 OVER FALLEN TIMBER RUN, BRIDGE 28 REPLACEMENT 200,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $160,000) 19970H0030B0757 - 11 -
1 (LAND ALLOCATION - $10,000) 2 (DESIGN AND CONTINGENCIES - $30,000) 3 (37) HAMPTON TOWNSHIP, DUNCAN AVENUE OVER 4 STILLHOUSE RUN, BRIDGE REPLACEMENT 230,000 5 (BASE CONSTRUCTION ALLOCATION - 6 $170,000) 7 (LAND ALLOCATION - $10,000) 8 (DESIGN AND CONTINGENCIES - $50,000) 9 (38) PENN HILLS TOWNSHIP, LINCOLN ROAD 10 OVER RYANS RUN, BRIDGE REPLACEMENT 190,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $140,000) 13 (LAND ALLOCATION - $10,000) 14 (DESIGN AND CONTINGENCIES - $40,000) 15 (39) PENNS HILLS TOWNSHIP, LINCOLN ROAD 16 OVER SANDY CREEK, BRIDGE REPLACEMENT 195,000 17 (BASE CONSTRUCTION ALLOCATION - 18 $150,000) 19 (LAND ALLOCATION - $5,000) 20 (DESIGN AND CONTINGENCIES - $40,000) 21 (40) NORTH VERSAILLES TOWNSHIP, CROOKED 22 RUN ROAD OVER CROOKED RUN, BRIDGE 23 REPLACEMENT 170,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $130,000) 26 (LAND ALLOCATION - $10,000) 27 (DESIGN AND CONTINGENCIES - $30,000) 28 (41) O'HARA TOWNSHIP, BROWNHILL ROAD OVER 29 LITTLE PINE CREEK, BRIDGE REPLACEMENT 275,000 30 (BASE CONSTRUCTION ALLOCATION - 19970H0030B0757 - 12 -
1 $231,000) 2 (DESIGN AND CONTINGENCIES - $44,000) 3 (42) ROSS TOWNSHIP, THOMPSON RUN ROAD OVER 4 SOUTH BRANCH OF PINE CREEK, BRIDGE 5 REPLACEMENT 210,000 6 (BASE CONSTRUCTION ALLOCATION - 7 $160,000) 8 (LAND ALLOCATION - $8,000) 9 (DESIGN AND CONTINGENCIES - $42,000) 10 (43) MOON TOWNSHIP, T-114, BECKS RUN ROAD 11 OVER FLAUGHERTY RUN, BRIDGE 12 REPLACEMENT 420,000 13 (BASE CONSTRUCTION ALLOCATION - 14 $350,000) 15 (LAND ALLOCATION - $20,000) 16 (DESIGN AND CONTINGENCIES - $50,000) 17 (44) SWISSVALE BOROUGH, KENMAUR BRIDGE 18 CONNECTING SWISSVALE AND RANKIN, BRIDGE 19 REPLACEMENT 320,000 20 (BASE CONSTRUCTION ALLOCATION - 21 $270,000) 22 (DESIGN AND CONTINGENCIES - $50,000) 23 (45) WILKINS TOWNSHIP, BROWN AVENUE BRIDGE 24 OVER BROWN RUN, BRIDGE REPLACEMENT 475,000 25 (BASE CONSTRUCTION ALLOCATION - 26 $380,000) 27 (DESIGN AND CONTINGENCIES - $95,000) 28 (46) WILKINS TOWNSHIP, IVY STREET BRIDGE 29 OVER BROWN RUN, BRIDGE REPLACEMENT 268,000 30 (BASE CONSTRUCTION ALLOCATION - 19970H0030B0757 - 13 -
1 $214,000) 2 (DESIGN AND CONTINGENCIES - $54,000) 3 (47) WILKINS TOWNSHIP, BAKER STREET BRIDGE 4 OVER CHALFANT RUN, BRIDGE REPLACEMENT 205,000 5 (BASE CONSTRUCTION ALLOCATION - 6 $164,000) 7 (DESIGN AND CONTINGENCIES - $41,000) 8 (48) UPPER ST. CLAIR TOWNSHIP, WALTHER 9 LANE BRIDGE, BRIDGE REPLACEMENT 700,000 10 (BASE CONSTRUCTION ALLOCATION - 11 $650,000) 12 (DESIGN AND CONTINGENCIES - $50,000) 13 (B) STATE BRIDGES 14 (1) SR 0028, ETNA BRIDGE, NORTHBOUND 15 BRIDGE NO.4 TO EXISTING SR 0028, ETNA 16 BOROUGH, SHALER TOWNSHIP, SHARPSBURG 17 BOROUGH AND O'HARA TOWNSHIP, BRIDGE 18 REHABILITATION 7,415,000 19 (BASE CONSTRUCTION ALLOCATION - 20 $7,115,000) 21 (LAND ALLOCATION - $300,000) 22 (2) SR 0028, ETNA BRIDGE TO 62ND STREET 23 BRIDGE, ETNA BOROUGH, SHALER TOWNSHIP, 24 SHARPSBURG BOROUGH AND O'HARA TOWNSHIP, 25 BRIDGE REHABILITATION 17,222,000 26 (BASE CONSTRUCTION ALLOCATION - 27 $17,022,000) 28 (LAND ALLOCATION - $200,000) 29 (3) SR 0030, ARDMORE WESTBOUND ELECTRIC 30 OVER SR 2112, CHALFANT BOROUGH, BRIDGE 19970H0030B0757 - 14 -
1 REPLACEMENT 3,100,000 2 (BASE CONSTRUCTION ALLOCATION - 3 $3,000,000) 4 (DESIGN AND CONTINGENCIES - $100,000) 5 (4) SR 0030, ARDMORE EASTBOUND ELECTRIC 6 OVER SR 2112, CHALFANT BOROUGH, BRIDGE 7 REPLACEMENT 2,500,000 8 (BASE CONSTRUCTION ALLOCATION - 9 $2,400,000) 10 (DESIGN AND CONTINGENCIES - $100,000) 11 (5) SR 0030, ARDMORE BOULEVARD BRIDGE NO.1 12 OVER FALLS RUN, NORTH OF SR 8012 13 INTERCHANGE, FOREST HILLS BOROUGH, 14 BRIDGE REPLACEMENT 550,000 15 (BASE CONSTRUCTION ALLOCATION - 16 $400,000) 17 (LAND ALLOCATION - $50,000) 18 (DESIGN AND CONTINGENCIES - $100,000) 19 (6) SR 0048, BOSTON HOLLOW ROAD BRIDGE 20 OVER UNNAMED STREAM, NORTH OF LINCOLN 21 BOROUGH, ELIZABETH BOROUGH, BRIDGE 22 REPLACEMENT 340,000 23 (BASE CONSTRUCTION ALLOCATION - 24 $200,000) 25 (LAND ALLOCATION - $40,000) 26 (DESIGN AND CONTINGENCIES - $100,000) 27 (7) SR 0050, BRIDGE OVER CHARTIERS CREEK, 28 NORTHBOUND LANE, HEIDELBERG BOROUGH, 29 SCOTT TOWNSHIP, BRIDGE REHABILITATION 3,750,000 30 (BASE CONSTRUCTION ALLOCATION - 19970H0030B0757 - 15 -
1 $3,300,000) 2 (LAND ALLOCATION - $50,000) 3 (DESIGN AND CONTINGENCIES - $400,000) 4 (8) SR 0060, SOUTH MAIN STREET BRIDGE OVER 5 SAW MILL RUN, SOUTH OF WEST END CIRCLE, 6 CITY OF PITTSBURGH, BRIDGE PAINTING 178,000 7 (BASE CONSTRUCTION ALLOCATION - 8 $173,000) 9 (DESIGN AND CONTINGENCIES - $5,000) 10 (9) SR 0130, TRI-BOROUGH EXTENDED BRIDGE 11 OVER PATTON STREET AT SR 8076 12 INTERCHANGE, WILMERDING BOROUGH, BRIDGE 13 REHABILITATION 505,000 14 (BASE CONSTRUCTION ALLOCATION - 15 $400,000) 16 (LAND ALLOCATION - $30,000) 17 (DESIGN AND CONTINGENCIES - $75,000) 18 (10) SR 0148, BRIDGE OVER CROOKED RUN 19 CREEK NEAR SR 2037, WHITE OAK BOROUGH, 20 BRIDGE REPLACEMENT 350,000 21 (BASE CONSTRUCTION ALLOCATION - 22 $200,000) 23 (LAND ALLOCATION - $50,000) 24 (DESIGN AND CONTINGENCIES - $100,000) 25 (11) SR 0791, BRIDGE OVER CHALFONT RUN AT 26 SR 2048, WILKINS TOWNSHIP, BRIDGE 27 REPLACEMENT 450,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $300,000) 30 (LAND ALLOCATION - $50,000) 19970H0030B0757 - 16 -
1 (DESIGN AND CONTINGENCIES - $100,000) 2 (12) SR 0837, NORTHBOUND RAMP A TO SR 0885 3 SOUTHBOUND, CITY OF PITTSBURGH, BRIDGE 4 REHABILITATION 1,350,000 5 (BASE CONSTRUCTION ALLOCATION - 6 $1,250,000) 7 (DESIGN AND CONTINGENCIES - $100,000) 8 (13) SR 0978, MILLER'S RUN ROAD BRIDGE 9 OVER DOLPHIN RUN, SOUTH FAYETTE 10 TOWNSHIP, BRIDGE REPLACEMENT 300,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $200,000) 13 (DESIGN AND CONTINGENCIES - $100,000) 14 (14) SR 1001, WEST 7TH AVENUE BRIDGE OVER 15 BULL CREEK, TARENTUM BOROUGH, BRIDGE 16 REPLACEMENT 400,000 17 (BASE CONSTRUCTION ALLOCATION - 18 $300,000) 19 (DESIGN AND CONTINGENCIES - $100,000) 20 (15) SR 1011, GUYS RUN ROAD BRIDGE OVER 21 GUYS RUN, NORTH OF SR 0028, HARMAR 22 TOWNSHIP, BRIDGE REPLACEMENT 350,000 23 (BASE CONSTRUCTION ALLOCATION - 24 $200,000) 25 (LAND ALLOCATION - $50,000) 26 (DESIGN AND CONTINGENCIES - $100,000) 27 (16) SR 2001, GLASSPORT-ELIZABETH ROAD 28 BRIDGE OVER BURNS RUN, NORTH OF 29 ELIZABETH TOWNSHIP, LINCOLN BOROUGH, 30 BRIDGE REPLACEMENT 350,000 19970H0030B0757 - 17 -
1 (BASE CONSTRUCTION ALLOCATION - 2 $200,000) 3 (LAND ALLOCATION - $50,000) 4 (DESIGN AND CONTINGENCIES - $100,000) 5 (17) SR 2081, TURTLE CREEK-MONROEVILLE 6 ROAD OVER US 22 BUSINESS, MONROEVILLE 7 BOROUGH, BRIDGE REPLACEMENT 1,060,000 8 (BASE CONSTRUCTION ALLOCATION - 9 $960,000) 10 (DESIGN AND CONTINGENCIES - $100,000) 11 (18) SR 2094, JEROME STREET BRIDGE OVER SR 12 2027, YOUGHIOGHENY RIVER, MCKEESPORT 13 BOROUGH, BRIDGE REHABILITATION 4,600,000 14 (BASE CONSTRUCTION ALLOCATION - 15 $4,500,000) 16 (DESIGN AND CONTINGENCIES - $100,000) 17 (19) SR 3066, STEUBENVILLE PIKE BRIDGE 18 OVER US 22, NORTH FAYETTE TOWNSHIP, 19 BRIDGE REHABILITATION 500,000 20 (BASE CONSTRUCTION ALLOCATION - 21 $400,000) 22 (LAND ALLOCATION - $25,000) 23 (DESIGN AND CONTINGENCIES - $75,000) 24 (20) SR 3069, LIBERTY TUNNEL AIRSHAFT 25 BETWEEN SR 0051 AND LIBERTY BRIDGE, 26 CITY OF PITTSBURGH, AIRSHAFT 27 RESTORATION 1,570,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $1,370,000) 30 (DESIGN AND CONTINGENCIES - $200,000) 19970H0030B0757 - 18 -
1 (21) SR 3104, MCKEES ROCKS SIDEWALK OVER 2 HARRIET STREET, MCKEES ROCKS BOROUGH, 3 BRIDGE REHABILITATION 6,800,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $6,700,000) 6 (DESIGN AND CONTINGENCIES - $100,000) 7 (22) SR 4036, BIG SEWICKLEY CREEK ROAD 8 OVER BIG SEWICKLEY CREEK AT SR 2003, 9 BELL ACRES BOROUGH, BRIDGE 10 REHABILITATION 500,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $400,000) 13 (LAND ALLOCATION - $25,000) 14 (DESIGN AND CONTINGENCIES - $75,000) 15 (23) SR 8043, SOUTHBOUND RAMP BRIDGE OVER 16 SR 0019 AND SR 0065, CITY OF 17 PITTSBURGH, BRIDGE REHABILITATION 2,400,000 18 (BASE CONSTRUCTION ALLOCATION - 19 $2,100,000) 20 (LAND ALLOCATION - $50,000) 21 (DESIGN AND CONTINGENCIES - $250,000) 22 (24) SR 8045, RAMP AT STADIUM OVER SR 0065 23 AND STADIUM DRIVE, CITY OF PITTSBURGH, 24 BRIDGE REHABILITATION 600,000 25 (BASE CONSTRUCTION ALLOCATION - 26 $600,000) 27 (25) SR 8049, SR 0019 BRIDGE RAMP, CHATEAU 28 STREET TO SR 0019, CITY OF PITTSBURGH, 29 BRIDGE REHABILITATION 2,350,000 30 (BASE CONSTRUCTION ALLOCATION - 19970H0030B0757 - 19 -
1 $2,000,000) 2 (LAND ALLOCATION - $50,000) 3 (DESIGN AND CONTINGENCIES - $300,000) 4 (26) SR 8049, BRIDGE RAMP FROM SR 0065 5 NORTHBOUND TO SR 0019, CITY OF 6 PITTSBURGH, BRIDGE REHABILITATION 2,850,000 7 (BASE CONSTRUCTION ALLOCATION - 8 $2,500,000) 9 (LAND ALLOCATION - $50,000) 10 (DESIGN AND CONTINGENCIES - $300,000) 11 (27) SR 8049, I-279 BRIDGE RAMP TO SR 0065 12 NORTHBOUND, CITY OF PITTSBURGH, BRIDGE 13 REHABILITATION 1,730,000 14 (BASE CONSTRUCTION ALLOCATION - 15 $1,500,000) 16 (LAND ALLOCATION - $30,000) 17 (DESIGN AND CONTINGENCIES - $200,000) 18 (28) SR 0030, ARDMORE BOULEVARD BRIDGE 19 NO.2 OVER FALLS RUN, NORTH OF SR 8012 20 INTERCHANGE, FOREST HILLS BOROUGH, 21 BRIDGE REPLACEMENT 550,000 22 (BASE CONSTRUCTION ALLOCATION - 23 $400,000) 24 (LAND ALLOCATION - $50,000) 25 (DESIGN AND CONTINGENCIES - $100,000) 26 (29) SR 3004, MCLAUGHLIN ROAD BRIDGE OVER 27 MCLAUGHLIN RUN, BRIDGEVILLE BOROUGH, 28 BRIDGE REPLACEMENT 227,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $177,000) 19970H0030B0757 - 20 -
1 (LAND ALLOCATION - $10,000) 2 (DESIGN AND CONTINGENCIES - $40,000) 3 (30) SR 0028, NORTHBOUND BRIDGE OVER 4 PENNSYLVANIA TURNPIKE, HARMAR TOWNSHIP, 5 BRIDGE REHABILITATION 344,000 6 (BASE CONSTRUCTION ALLOCATION - 7 $314,000) 8 (DESIGN AND CONTINGENCIES - $30,000) 9 (31) SR 0028, SOUTHBOUND BRIDGE OVER 10 PENNSYLVANIA TURNPIKE, HARMAR TOWNSHIP, 11 BRIDGE REHABILITATION 356,000 12 (BASE CONSTRUCTION ALLOCATION - 13 $325,000) 14 (DESIGN AND CONTINGENCIES - $31,000) 15 (32) SR 0028, NORTHBOUND BRIDGE OVER SR 16 1028, HARRISON TOWNSHIP, BRIDGE 17 REHABILITATION 106,000 18 (BASE CONSTRUCTION ALLOCATION - 19 $97,000) 20 (DESIGN AND CONTINGENCIES - $9,000) 21 (33) SR 0028, SOUTHBOUND BRIDGE OVER SR 22 1028, HARRISON TOWNSHIP, BRIDGE 23 REHABILITATION 105,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $96,000) 26 (DESIGN AND CONTINGENCIES - $9,000) 27 (34) SR 0050, WASHINGTON AVENUE BRIDGE 28 OVER CHARTIERS CREEK, BRIDGEVILLE 29 BOROUGH, BRIDGE REHABILITATION 119,000 30 (BASE CONSTRUCTION ALLOCATION - 19970H0030B0757 - 21 -
1 $109,000) 2 (DESIGN AND CONTINGENCIES - $10,000) 3 (35) SR 0051, CLAIRTON BOULEVARD BRIDGE 4 OVER LEWIS RUN, PLEASANT HILLS BOROUGH, 5 BRIDGE REPLACEMENT 600,000 6 (BASE CONSTRUCTION ALLOCATION - 7 $500,000) 8 (DESIGN AND CONTINGENCIES - $100,000) 9 (36) SR 0065, OHIO RIVER BOULEVARD BRIDGE 10 OVER FOREST AVENUE, BEN AVON BOROUGH, 11 BRIDGE REPLACEMENT 396,000 12 (BASE CONSTRUCTION ALLOCATION - 13 $360,000) 14 (DESIGN AND CONTINGENCIES - $36,000) 15 (37) SR 0065, BRIDGE OVER RAMPS, RAILROAD 16 AND CHATEAU STREET, CITY OF PITTSBURGH, 17 BRIDGE REHABILITATION 13,284,000 18 (BASE CONSTRUCTION ALLOCATION - 19 $12,784,000) 20 (DESIGN AND CONTINGENCIES - $500,000) 21 (38) SR 0079, NEVILLE ISLAND BRIDGE OVER 22 OHIO RIVER, NEVILLE TOWNSHIP, BRIDGE 23 REHABILITATION 12,700,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $11,200,000) 26 (DESIGN AND CONTINGENCIES - $1,500,000) 27 (39) SR 0088, LIBRARY ROAD BRIDGE NO.1 28 OVER PINEY FORK CREEK, BETHEL PARK 29 BOROUGH, BRIDGE REPLACEMENT 161,000 30 (BASE CONSTRUCTION ALLOCATION - 19970H0030B0757 - 22 -
1 $128,000) 2 (LAND ALLOCATION - $20,000) 3 (DESIGN AND CONTINGENCIES - $13,000) 4 (40) SR 0088, LIBRARY ROAD BRIDGE NO.2 5 OVER BRANCH OF PINEY FORK CREEK, BETHEL 6 PARK BOROUGH, BRIDGE REPLACEMENT 161,000 7 (BASE CONSTRUCTION ALLOCATION - 8 $128,000) 9 (LAND ALLOCATION - $20,000) 10 (DESIGN AND CONTINGENCIES - $13,000) 11 (41) SR 0885, MIFFLIN ROAD BRIDGE OVER 12 BRANCH OF STREETS RUN, CITY OF 13 PITTSBURGH, BRIDGE REPLACEMENT 600,000 14 (BASE CONSTRUCTION ALLOCATION - 15 $500,000) 16 (DESIGN AND CONTINGENCIES - $100,000) 17 (42) SR 0910, GIBSONIA ROAD BRIDGE OVER 18 RAWLINS RUN, INDIANA TOWNSHIP, BRIDGE 19 DECK REPLACEMENT 132,000 20 (BASE CONSTRUCTION ALLOCATION - 21 $120,000) 22 (DESIGN AND CONTINGENCIES - $12,000) 23 (43) SR 1027, PLEASANTVILLE ROAD BRIDGE 24 OVER LITTLE BULL CREEK, HARRISON 25 TOWNSHIP, BRIDGE REPLACEMENT 400,000 26 (BASE CONSTRUCTION ALLOCATION - 27 $300,000) 28 (DESIGN AND CONTINGENCIES - $100,000) 29 (44) SR 1032, BURTNER ROAD BRIDGE OVER 30 LITTLE BULL CREEK, HARRISON TOWNSHIP, 19970H0030B0757 - 23 -
1 BRIDGE DECK REPLACEMENT 198,000 2 (BASE CONSTRUCTION ALLOCATION - 3 $180,000) 4 (DESIGN AND CONTINGENCIES - $18,000) 5 (45) SR 2008, LOVEDALE ROAD BRIDGE OVER 6 WYLIE RUN CREEK, ELIZABETH TOWNSHIP, 7 BRIDGE REPLACEMENT 430,000 8 (BASE CONSTRUCTION ALLOCATION - 9 $300,000) 10 (LAND ALLOCATION - $30,000) 11 (DESIGN AND CONTINGENCIES - $100,000) 12 (46) SR 2017, PINEVIEW DRIVE BRIDGE NO.1 13 OVER GILLESPIE RUN, ELIZABETH TOWNSHIP, 14 BRIDGE DECK REPLACEMENT 255,000 15 (BASE CONSTRUCTION ALLOCATION - 16 $135,000) 17 (LAND ALLOCATION - $20,000) 18 (DESIGN AND CONTINGENCIES - $100,000) 19 (47) SR 2017, PINEVIEW DRIVE BRIDGE NO.2 20 OVER GILLESPIE RUN, ELIZABETH TOWNSHIP, 21 BRIDGE DECK REPLACEMENT 243,000 22 (BASE CONSTRUCTION ALLOCATION - 23 $123,000) 24 (LAND ALLOCATION - $20,000) 25 (DESIGN AND CONTINGENCIES - $100,000) 26 (48) SR 2018, WEST SMITHFIELD ROAD BRIDGE 27 OVER UNNAMED CREEK, ELIZABETH TOWNSHIP, 28 BRIDGE DECK REPLACEMENT 218,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $118,000) 19970H0030B0757 - 24 -
1 (DESIGN AND CONTINGENCIES - $100,000) 2 (49) SR 2031, LINCOLN WAY BRIDGE OVER LONG 3 RUN, WHITE OAK BOROUGH, BRIDGE 4 REPLACEMENT 600,000 5 (BASE CONSTRUCTION ALLOCATION - 6 $500,000) 7 (DESIGN AND CONTINGENCIES - $100,000) 8 (50) SR 2051, BRINTON ROAD BRIDGE OVER I- 9 376, EDGEWOOD BOROUGH, BRIDGE 10 REHABILITATION 996,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $846,000) 13 (DESIGN AND CONTINGENCIES - $150,000) 14 (51) SR 4019, MOUNT ROYAL BOULEVARD BRIDGE 15 OVER PINE CREEK, HAMPTON TOWNSHIP, 16 BRIDGE REHABILITATION 94,000 17 (BASE CONSTRUCTION ALLOCATION - 18 $89,000) 19 (DESIGN AND CONTINGENCIES - $5,000) 20 (52) SR 4043, BIG SEWICKLEY ROAD BRIDGE 21 OVER BRANCH OF BIG SEWICKLEY CREEK, 22 FRANKLIN PARK BOROUGH, BRIDGE 23 REPLACEMENT 84,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $76,000) 26 (DESIGN AND CONTINGENCIES - $8,000) 27 (53) SR 8002, CROSSTOWN BOULEVARD BRIDGE 28 OVER FORBES AND DIAMOND STREET AND 29 RAMPS, CITY OF PITTSBURGH, BRIDGE 30 PAINTING 310,000 19970H0030B0757 - 25 -
1 (BASE CONSTRUCTION ALLOCATION - 2 $300,000) 3 (DESIGN AND CONTINGENCIES - $10,000) 4 (54) SR 8002, RAMP L ROAD BRIDGE OVER 5 FORBES AND DIAMOND STREETS, CITY OF 6 PITTSBURGH, BRIDGE PAINTING 110,000 7 (BASE CONSTRUCTION ALLOCATION - 8 $100,000) 9 (DESIGN AND CONTINGENCIES - $10,000) 10 (55) SR 8015, RAMP D ROAD BRIDGE OVER OHIO 11 RIVER BACK CHANNEL, NEVILLE TOWNSHIP, 12 BRIDGE REHABILITATION 800,000 13 (BASE CONSTRUCTION ALLOCATION - 14 $700,000) 15 (DESIGN AND CONTINGENCIES - $100,000) 16 (56) SR 8015, RAMP E ROAD BRIDGE OVER PC&Y 17 RAILROAD, NEVILLE TOWNSHIP, BRIDGE 18 REHABILITATION 670,000 19 (BASE CONSTRUCTION ALLOCATION - 20 $500,000) 21 (DESIGN AND CONTINGENCIES - $170,000) 22 (57) SR 8015, I-79 RAMP H BRIDGE OVER PC&Y 23 RAILROAD, NEVILLE TOWNSHIP, BRIDGE 24 REHABILITATION 700,000 25 (BASE CONSTRUCTION ALLOCATION - 26 $600,000) 27 (DESIGN AND CONTINGENCIES - $100,000) 28 (58) SR 8015, RAMP J ROAD BRIDGE OVER 29 NEVILLE ROAD, NEVILLE TOWNSHIP, BRIDGE 30 REHABILITATION 220,000 19970H0030B0757 - 26 -
1 (BASE CONSTRUCTION ALLOCATION - 2 $200,000) 3 (DESIGN AND CONTINGENCIES - $20,000) 4 (59) SR 8017, RAMP B2 ROAD BRIDGE OVER SR 5 4025 AND SR 4033, GLENFIELD BOROUGH, 6 BRIDGE REHABILITATION 110,000 7 (BASE CONSTRUCTION ALLOCATION - 8 $100,000) 9 (DESIGN AND CONTINGENCIES - $10,000) 10 (60) SR 8017, RAMP B ROAD BRIDGE OVER RAMP 11 A AND SR 4033, GLENFIELD BOROUGH, 12 BRIDGE REHABILITATION 120,000 13 (BASE CONSTRUCTION ALLOCATION - 14 $110,000) 15 (DESIGN AND CONTINGENCIES - $10,000) 16 (61) SR 8017, RAMP B1 ROAD BRIDGE OVER SR 17 0065 RAMPS A1 AND R, GLENFIELD BOROUGH, 18 BRIDGE REHABILITATION 165,000 19 (BASE CONSTRUCTION ALLOCATION - 20 $150,000) 21 (DESIGN AND CONTINGENCIES - $15,000) 22 (62) SR 8017, RAMP A ROAD BRIDGE OVER RAMP 23 B3, GLENFIELD BOROUGH, BRIDGE 24 REHABILITATION 110,000 25 (BASE CONSTRUCTION ALLOCATION - 26 $100,000) 27 (DESIGN AND CONTINGENCIES - $10,000) 28 (63) SR 0028, ETNA BRIDGES, PHASE III, 29 NORTHBOUND BRIDGE NO.4 TO EXISTING SR 30 0028, TWO STRUCTURES, ETNA AND 19970H0030B0757 - 27 -
1 SHARPSBURG BOROUGHS, BRIDGE 2 REHABILITATION 6,300,000 3 (BASE CONSTRUCTION ALLOCATION - 4 $6,000,000) 5 (LAND ALLOCATION - $300,000) 6 (64) SR 0028, ETNA BRIDGE, PHASE II, 7 SOUTHBOUND BRIDGE NO.3 AND NORTHBOUND 8 BRIDGE FOR SR 0008 CONNECTION, ETNA AND 9 SHARPSBURG BOROUGHS AND SHALER 10 TOWNSHIP, BRIDGE REHABILITATION 13,200,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $12,200,000) 13 (LAND ALLOCATION - $1,000,000) 14 (65) SR 2013, MONESSEN-ELIZABETH ROAD 15 BRIDGE OVER BECKETTS RUN, FORWARD 16 TOWNSHIP, BRIDGE REPLACEMENT 450,000 17 (BASE CONSTRUCTION ALLOCATION - 18 $300,000) 19 (LAND ALLOCATION - $50,000) 20 (DESIGN AND CONTINGENCIES - $100,000) 21 (66) SR 2016, JEFFERSON HEIGHTS ROAD 22 BRIDGE OVER I-376, WILKINS TOWNSHIP, 23 BRIDGE RECONSTRUCTION 1,600,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $1,200,000) 26 (DESIGN AND CONTINGENCIES - $400,000) 27 SECTION 7. ARMSTRONG COUNTY. 28 (A) LOCAL BRIDGES 29 (1) BOGGS TOWNSHIP, T-850, SCRUBGRASS 30 BRIDGE OVER SCRUBGRASS CREEK, BRIDGE 19970H0030B0757 - 28 -
1 REHABILITATION 230,000 2 (BASE CONSTRUCTION ALLOCATION - 3 $170,000) 4 (LAND ALLOCATION - $10,000) 5 (DESIGN AND CONTINGENCIES - $50,000) 6 (2) BOGGS TOWNSHIP, T-632, SCRUBGRASS 7 BRIDGE NO.2 OVER SCRUBGRASS CREEK, 8 BRIDGE REHABILITATION 185,000 9 (BASE CONSTRUCTION ALLOCATION - 10 $150,000) 11 (LAND ALLOCATION - $10,000) 12 (DESIGN AND CONTINGENCIES - $25,000) 13 (3) BOGGS TOWNSHIP, T-821, PINE CREEK 14 BRIDGE OVER NORTH FORK OF PINE CREEK, 15 BRIDGE REHABILITATION 140,000 16 (BASE CONSTRUCTION ALLOCATION - 17 $100,000) 18 (LAND ALLOCATION - $10,000) 19 (DESIGN AND CONTINGENCIES - $30,000) 20 (4) NORTH BUFFALO TOWNSHIP, T-300, BLAINE 21 BRIDGE OVER BUFFALO CREEK, BRIDGE 22 REPLACEMENT 500,000 23 (BASE CONSTRUCTION ALLOCATION - 24 $400,000) 25 (LAND ALLOCATION - $20,000) 26 (DESIGN AND CONTINGENCIES - $80,000) 27 (5) NORTH BUFFALO TOWNSHIP, T-414, CHURCH 28 ROAD BRIDGE OVER STREAM, BRIDGE 29 REPLACEMENT 150,000 30 (BASE CONSTRUCTION ALLOCATION - 19970H0030B0757 - 29 -
1 $100,000) 2 (LAND ALLOCATION - $10,000) 3 (DESIGN AND CONTINGENCIES - $40,000) 4 (6) WEST KITTANNING BOROUGH, T-759, BRIDGE 5 OVER STREAM, BRIDGE REPLACEMENT 325,000 6 (BASE CONSTRUCTION ALLOCATION - 7 $265,000) 8 (LAND ALLOCATION - $10,000) 9 (DESIGN AND CONTINGENCIES - $50,000) 10 (B) STATE BRIDGES 11 (1) SR 0028, BUFFALO CREEK BRIDGE OVER 12 BUFFALO CREEK AND CONRAIL, SOUTH 13 BUFFALO TOWNSHIP, BRIDGE PAINTING 3,010,000 14 (BASE CONSTRUCTION ALLOCATION - 15 $3,000,000) 16 (DESIGN AND CONTINGENCIES - $10,000) 17 (2) SR 3023, IRON BRIDGE ROAD, PINE RUN 18 BRIDGE REPLACEMENT, SOUTH BUFFALO 19 TOWNSHIP, BRIDGE REPLACEMENT 550,000 20 (BASE CONSTRUCTION ALLOCATION - 21 $510,000) 22 (LAND ALLOCATION - $20,000) 23 (DESIGN AND CONTINGENCIES - $20,000) 24 (3) SR 0156, LONG RUN BRIDGE OVER LONG 25 RUN, KISKIMINETAS TOWNSHIP, BRIDGE 26 PAINTING 75,000 27 (BASE CONSTRUCTION ALLOCATION - 28 $60,000) 29 (DESIGN AND CONTINGENCIES - $15,000) 30 (4) SR 0422, US 422 EASTBOUND OVERPASS 19970H0030B0757 - 30 -
1 BRIDGE OVER SR 0028, EAST FRANKLIN 2 TOWNSHIP, BRIDGE PAINTING 190,000 3 (BASE CONSTRUCTION ALLOCATION - 4 $175,000) 5 (DESIGN AND CONTINGENCIES - $15,000) 6 (5) SR 0422, US 422 WESTBOUND OVERPASS 7 BRIDGE OVER SR 0028, EAST FRANKLIN 8 TOWNSHIP, BRIDGE PAINTING 190,000 9 (BASE CONSTRUCTION ALLOCATION - 10 $175,000) 11 (DESIGN AND CONTINGENCIES - $15,000) 12 (6) SR 1028, OSCAR BRIDGE OVER PINE CREEK, 13 BOGGS TOWNSHIP, BRIDGE PAINTING 95,000 14 (BASE CONSTRUCTION ALLOCATION - 15 $80,000) 16 (DESIGN AND CONTINGENCIES - $15,000) 17 (7) SR 0028, BUFFALO CREEK BRIDGE OVER 18 BUFFALO CREEK, SOUTH BUFFALO TOWNSHIP, 19 BRIDGE PAINTING 1,730,000 20 (BASE CONSTRUCTION ALLOCATION - 21 $1,700,000) 22 (DESIGN AND CONTINGENCIES - $30,000) 23 (8) SR 0066, GUFFY RUN BRIDGE OVER GUFFY 24 RUN, PARKS TOWNSHIP, BRIDGE PAINTING 85,000 25 (BASE CONSTRUCTION ALLOCATION - 26 $70,000) 27 (DESIGN AND CONTINGENCIES - $15,000) 28 (9) SR 0066, GARRETT'S RUN BRIDGE OVER 29 GARRETT'S RUN AND OLD 66, MANOR 30 TOWNSHIP, BRIDGE PAINTING 1,230,000 19970H0030B0757 - 31 -
1 (BASE CONSTRUCTION ALLOCATION - 2 $1,200,000) 3 (DESIGN AND CONTINGENCIES - $30,000) 4 (10) SR 0128, CADOGAN BRIDGE OVER 5 TRIBUTARY OF ALLEGHENY RIVER, CADOGAN 6 TOWNSHIP, BRIDGE PAINTING 380,000 7 (BASE CONSTRUCTION ALLOCATION - 8 $360,000) 9 (DESIGN AND CONTINGENCIES - $20,000) 10 (11) SR 0422, JUDGE GRAFF BRIDGE OVER 11 ALLEGHENY RIVER, NORTH BUFFALO 12 TOWNSHIP, BRIDGE PAINTING 2,930,000 13 (BASE CONSTRUCTION ALLOCATION - 14 $2,900,000) 15 (DESIGN AND CONTINGENCIES - $30,000) 16 (12) SR 0422, RAMP C AND F BRIDGE OVER END 17 OF BYPASS, MANOR TOWNSHIP, BRIDGE 18 PAINTING 180,000 19 (BASE CONSTRUCTION ALLOCATION - 20 $165,000) 21 (DESIGN AND CONTINGENCIES - $15,000) 22 (13) SR 0422, RAMP F BRIDGE OVER SR 0066, 23 MANOR TOWNSHIP, BRIDGE PAINTING 190,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $175,000) 26 (DESIGN AND CONTINGENCIES - $15,000) 27 (14) SR 1021, EDDYVILLE BRIDGE OVER PINE 28 RUN, REDBANK TOWNSHIP, BRIDGE PAINTING 100,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $85,000) 19970H0030B0757 - 32 -
1 (DESIGN AND CONTINGENCIES - $15,000) 2 (15) SR 1028, BRYAN BRIDGE OVER BRANCH OF 3 PINE CREEK, COWANSHANNOCK TOWNSHIP, 4 BRIDGE PAINTING 50,000 5 (BASE CONSTRUCTION ALLOCATION - 6 $35,000) 7 (DESIGN AND CONTINGENCIES - $15,000) 8 (16) SR 1034, MOSGROVE BRIDGE OVER NORTH 9 FORK OF PINE CREEK, BOGGS TOWNSHIP, 10 BRIDGE PAINTING 65,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $50,000) 13 (DESIGN AND CONTINGENCIES - $15,000) 14 (17) SR 1037, ECHO BRIDGE OVER PINE CREEK, 15 WAYNE TOWNSHIP, BRIDGE PAINTING 85,000 16 (BASE CONSTRUCTION ALLOCATION - 17 $70,000) 18 (DESIGN AND CONTINGENCIES - $15,000) 19 (18) SR 2001, RURAL VALLEY BRIDGE OVER 20 COWANSHANNOCK CREEK, RURAL VALLEY 21 BOROUGH, BRIDGE PAINTING 130,000 22 (BASE CONSTRUCTION ALLOCATION - 23 $115,000) 24 (DESIGN AND CONTINGENCIES - $15,000) 25 (19) SR 2005, BRICK CHURCH BRIDGE OVER 26 BRANCH OF CHERRY RUN, BURRELL TOWNSHIP, 27 BRIDGE PAINTING 75,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $60,000) 30 (DESIGN AND CONTINGENCIES - $15,000) 19970H0030B0757 - 33 -
1 (20) SR 2005, CHERRY RUN BRIDGE OVER 2 CHERRY RUN, PLUMCREEK TOWNSHIP, BRIDGE 3 PAINTING 85,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $70,000) 6 (DESIGN AND CONTINGENCIES - $15,000) 7 (21) SR 2005, ELGIN CEMETERY BRIDGE OVER 8 COWANSHANNOCK CREEK, COWANSHANNOCK 9 TOWNSHIP, BRIDGE PAINTING 85,000 10 (BASE CONSTRUCTION ALLOCATION - 11 $70,000) 12 (DESIGN AND CONTINGENCIES - $15,000) 13 (22) SR 2010, GARRETT'S RUN BRIDGE OVER 14 GARRETT'S RUN, MANOR TOWNSHIP, BRIDGE 15 PAINTING 75,000 16 (BASE CONSTRUCTION ALLOCATION - 17 $60,000) 18 (DESIGN AND CONTINGENCIES - $15,000) 19 (23) SR 2023, WHEEL-IN-CAMPGROUND BRIDGE 20 OVER PLUM CREEK, PLUMCREEK TOWNSHIP, 21 BRIDGE PAINTING 125,000 22 (BASE CONSTRUCTION ALLOCATION - 23 $110,000) 24 (DESIGN AND CONTINGENCIES - $15,000) 25 (24) SR 2025, GARRETT'S RUN BRIDGE NO.1 26 OVER GARRETT'S RUN, MANOR TOWNSHIP, 27 BRIDGE PAINTING 80,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $65,000) 30 (DESIGN AND CONTINGENCIES - $15,000) 19970H0030B0757 - 34 -
1 (25) SR 2025, GARRETT'S RUN BRIDGE NO.2 2 OVER GARRETT'S RUN, MANOR TOWNSHIP, 3 BRIDGE PAINTING 80,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $65,000) 6 (DESIGN AND CONTINGENCIES - $15,000) 7 (26) SR 2025, GARRETT'S RUN BRIDGE NO.3 8 OVER GARRETT'S RUN, MANOR TOWNSHIP, 9 BRIDGE PAINTING 90,000 10 (BASE CONSTRUCTION ALLOCATION - 11 $75,000) 12 (DESIGN AND CONTINGENCIES - $15,000) 13 (27) SR 2027, GIRTY BRIDGE OVER CROOKED 14 CREEK, SOUTH BEND TOWNSHIP, BRIDGE 15 PAINTING 155,000 16 (BASE CONSTRUCTION ALLOCATION - 17 $140,000) 18 (DESIGN AND CONTINGENCIES - $15,000) 19 (28) SR 2029, KELLY'S STATION ROAD BRIDGE 20 OVER TAYLOR RUN, BETHEL TOWNSHIP, 21 BRIDGE PAINTING 60,000 22 (BASE CONSTRUCTION ALLOCATION - 23 $45,000) 24 (DESIGN AND CONTINGENCIES - $15,000) 25 (29) SR 2036, STILT'S RUN BRIDGE OVER 26 STILT'S RUN, PARKS TOWNSHIP, BRIDGE 27 PAINTING 50,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $35,000) 30 (DESIGN AND CONTINGENCIES - $15,000) 19970H0030B0757 - 35 -
1 (30) SR 2036, CARNAHAN RUN BRIDGE OVER 2 CARNAHAN RUN, PARKS TOWNSHIP, BRIDGE 3 PAINTING 75,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $60,000) 6 (DESIGN AND CONTINGENCIES - $15,000) 7 (31) SR 2050, RATTLING RUN BRIDGE OVER 8 RATTLING RUN, KISKIMINETAS TOWNSHIP, 9 BRIDGE PAINTING 65,000 10 (BASE CONSTRUCTION ALLOCATION - 11 $50,000) 12 (DESIGN AND CONTINGENCIES - $15,000) 13 (32) SR 2051, FLAT RUN BRIDGE OVER FLAT 14 RUN, KISKIMINETAS TOWNSHIP, BRIDGE 15 PAINTING 55,000 16 (BASE CONSTRUCTION ALLOCATION - 17 $40,000) 18 (DESIGN AND CONTINGENCIES - $15,000) 19 (33) SR 2051, EQUITABLE BRIDGE OVER 20 RATTLING RUN, KISKIMINETAS TOWNSHIP, 21 BRIDGE PAINTING 55,000 22 (BASE CONSTRUCTION ALLOCATION - 23 $40,000) 24 (DESIGN AND CONTINGENCIES - $15,000) 25 (34) SR 2057, PARKS PUMP STATION BRIDGE 26 NO.1 OVER CARNAHAN RUN, PARKS TOWNSHIP, 27 BRIDGE PAINTING 80,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $65,000) 30 (DESIGN AND CONTINGENCIES - $15,000) 19970H0030B0757 - 36 -
1 (35) SR 2058, PARKS PUMP STATION BRIDGE 2 NO.2 OVER CARNAHAN RUN, PARKS TOWNSHIP, 3 BRIDGE PAINTING 75,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $60,000) 6 (DESIGN AND CONTINGENCIES - $15,000) 7 (36) SR 3005, GLADE RUN BRIDGE OVER GLADE 8 RUN, NORTH BUFFALO TOWNSHIP, BRIDGE 9 PAINTING 75,000 10 (BASE CONSTRUCTION ALLOCATION - 11 $60,000) 12 (DESIGN AND CONTINGENCIES - $15,000) 13 (37) SR 3013, LITTLE BUFFALO BRIDGE OVER 14 LITTLE BUFFALO CREEK, WEST FRANKLIN 15 TOWNSHIP, BRIDGE PAINTING 100,000 16 (BASE CONSTRUCTION ALLOCATION - 17 $85,000) 18 (DESIGN AND CONTINGENCIES - $15,000) 19 (38) SR 3013, HARRIGAN RUN BRIDGE OVER 20 HARRIGAN RUN, WEST FRANKLIN TOWNSHIP, 21 BRIDGE PAINTING 60,000 22 (BASE CONSTRUCTION ALLOCATION - 23 $45,000) 24 (DESIGN AND CONTINGENCIES - $15,000) 25 (39) SR 3017, WEST PENN POWER BRIDGE OVER 26 SR 0422 AND SR 0028, EAST FRANKLIN 27 TOWNSHIP, BRIDGE PAINTING 375,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $360,000) 30 (DESIGN AND CONTINGENCIES - $15,000) 19970H0030B0757 - 37 -
1 (40) SR 4007, KAYLOR BRIDGE OVER SUGAR 2 CREEK, BRADYS BEND TOWNSHIP, BRIDGE 3 PAINTING 60,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $45,000) 6 (DESIGN AND CONTINGENCIES - $15,000) 7 (41) SR 4013, FOSTER MILLS BRIDGE OVER 8 BRANCH OF PATTERSON RUN, SUGARCREEK 9 TOWNSHIP, BRIDGE PAINTING 70,000 10 (BASE CONSTRUCTION ALLOCATION - 11 $55,000) 12 (DESIGN AND CONTINGENCIES - $15,000) 13 (42) SR 8008, FORD CITY RAMP FROM JUDGE 14 GRAFF BRIDGE OVER A RAVINE, MANOR 15 TOWNSHIP, BRIDGE PAINTING 555,000 16 (BASE CONSTRUCTION ALLOCATION - 17 $540,000) 18 (DESIGN AND CONTINGENCIES - $15,000) 19 (43) SR 4035, CRAIGSVILLE BRIDGE OVER 20 BUFFALO CREEK, WEST FRANKLIN TOWNSHIP, 21 BRIDGE PAINTING 140,000 22 (BASE CONSTRUCTION ALLOCATION - 23 $125,000) 24 (DESIGN AND CONTINGENCIES - $15,000) 25 (44) SR 0068, KAYLOR OVERPASS, RAILROAD 26 OVER PA 68, BRADYS BEND TOWNSHIP, 27 BRIDGE REMOVAL 560,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $500,000) 30 (LAND ALLOCATION - $10,000) 19970H0030B0757 - 38 -
1 (DESIGN AND CONTINGENCIES - $50,000) 2 (45) SR 0068, B&LE RAILROAD OVERPASS, 3 BRADYS BEND TOWNSHIP, BRIDGE REMOVAL 55,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $50,000) 6 (DESIGN AND CONTINGENCIES - $5,000) 7 (46) SR 0066, GUFFY RUN BRIDGE OVER GUFFY 8 RUN, GILPIN TOWNSHIP, BRIDGE 9 REHABILITATION 1,050,000 10 (BASE CONSTRUCTION ALLOCATION - 11 $750,000) 12 (LAND ALLOCATION - $50,000) 13 (DESIGN AND CONTINGENCIES - $250,000) 14 SECTION 8. BEAVER COUNTY. 15 (A) LOCAL BRIDGES 16 (1) AMBRIDGE AND ALIQUIPPA BOROUGHS, 17 AMBRIDGE - ALIQUIPPA BRIDGE OVER OHIO 18 RIVER, BRIDGE CONSTRUCTION 38,000,000 19 (BASE CONSTRUCTION ALLOCATION - 20 $30,000,000) 21 (LAND ALLOCATION - $4,000,000) 22 (DESIGN AND CONTINGENCIES - $4,000,000) 23 (2) VANPORT TOWNSHIP, VANPORT BRIDGE NO.6 24 OVER TWO MILE RUN, BRIDGE REPLACEMENT 465,000 25 (BASE CONSTRUCTION ALLOCATION - 26 $375,000) 27 (LAND ALLOCATION - $10,000) 28 (DESIGN AND CONTINGENCIES - $80,000) 29 (3) VANPORT TOWNSHIP, VANPORT BRIDGE NO.7 30 OVER TWO MILE RUN, BRIDGE REPLACEMENT 470,000 19970H0030B0757 - 39 -
1 (BASE CONSTRUCTION ALLOCATION - 2 $380,000) 3 (LAND ALLOCATION - $10,000) 4 (DESIGN AND CONTINGENCIES - $80,000) 5 (4) VANPORT TOWNSHIP, VANPORT BRIDGE NO.8 6 OVER TWO MILE RUN, BRIDGE REPLACEMENT 510,000 7 (BASE CONSTRUCTION ALLOCATION - 8 $420,000) 9 (LAND ALLOCATION - $10,000) 10 (DESIGN AND CONTINGENCIES - $80,000) 11 (5) VANPORT TOWNSHIP, VANPORT BRIDGE NO.9 12 OVER TWO MILE RUN, BRIDGE REPLACEMENT 440,000 13 (BASE CONSTRUCTION ALLOCATION - 14 $350,000) 15 (LAND ALLOCATION - $10,000) 16 (DESIGN AND CONTINGENCIES - $80,000) 17 (B) STATE BRIDGES 18 (1) SR 0051, BRIDGE OVER NEW YORK AVENUE, 19 RAMP A, ROCHESTER BOROUGH, BRIDGE DECK 20 REPLACEMENT 5,600,000 21 (BASE CONSTRUCTION ALLOCATION - 22 $5,500,000) 23 (DESIGN AND CONTINGENCIES - $100,000) 24 (2) SR 0351, 5TH STREET, KOPPEL-ELLWOOD 25 BRIDGE OVER BEAVER RIVER, KOPPEL 26 BOROUGH AND NORTH SEWICKLEY TOWNSHIP, 27 BRIDGE REPLACEMENT, PHASE I 33,500,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $30,000,000) 30 (LAND ALLOCATION - $1,000,000) 19970H0030B0757 - 40 -
1 (DESIGN AND CONTINGENCIES - $2,500,000) 2 (3) SR 1014, WISE'S GROVE ROAD BRIDGE OVER 3 BRUSH CREEK, MARION TOWNSHIP, BRIDGE 4 REHABILITATION 750,000 5 (BASE CONSTRUCTION ALLOCATION - 6 $600,000) 7 (LAND ALLOCATION - $50,000) 8 (DESIGN AND CONTINGENCIES - $100,000) 9 (4) SR 1022, 13TH STREET BRIDGE OVER 10 BLOCKHOUSE RUN AT PULASKI COUNTY LINE, 11 NEW BRIGHTON BOROUGH, BRIDGE 12 REPLACEMENT 780,000 13 (BASE CONSTRUCTION ALLOCATION - 14 $480,000) 15 (LAND ALLOCATION - $50,000) 16 (DESIGN AND CONTINGENCIES - $250,000) 17 (5) SR 4032, ENGLE ROAD BRIDGE OVER SIX 18 MILE RUN CREEK, INDUSTRY BOROUGH, 19 BRIDGE REPLACEMENT 350,000 20 (BASE CONSTRUCTION ALLOCATION - 21 $200,000) 22 (LAND ALLOCATION - $50,000) 23 (DESIGN AND CONTINGENCIES - $100,000) 24 (6) SR 4033, WILDWOOD ROAD BRIDGE OVER 25 BRADY'S RUN, PATTERSON TOWNSHIP, BRIDGE 26 REPLACEMENT 400,000 27 (BASE CONSTRUCTION ALLOCATION - 28 $250,000) 29 (LAND ALLOCATION - $50,000) 30 (DESIGN AND CONTINGENCIES - $100,000) 19970H0030B0757 - 41 -
1 (7) SR 8035, RAMP A AT LR 641 OVER SLOPE, 2 ROCHESTER BOROUGH, BRIDGE 3 REHABILITATION 1,200,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $1,000,000) 6 (LAND ALLOCATION - $50,000) 7 (DESIGN AND CONTINGENCIES - $150,000) 8 (8) SR 8037, RAMP F OVER TR 51 AND TR 65 9 NORTHBOUND, ROCHESTER BOROUGH, BRIDGE 10 REPLACEMENT 550,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $400,000) 13 (LAND ALLOCATION - $50,000) 14 (DESIGN AND CONTINGENCIES - $100,000) 15 (9) SR 8039, RAMP AD, SR 0168 OVER TR 51, 16 BRIDGEWATER BOROUGH, BRIDGE 17 REHABILITATION 700,000 18 (BASE CONSTRUCTION ALLOCATION - 19 $550,000) 20 (LAND ALLOCATION - $50,000) 21 (DESIGN AND CONTINGENCIES - $100,000) 22 (10) SR 3018, CULVERT-PIPE STYLE BRIDGE 23 OVER MOODY'S RUN, GREENE TOWNSHIP, 24 BRIDGE CONSTRUCTION 385,000 25 (BASE CONSTRUCTION ALLOCATION - 26 $350,000) 27 (DESIGN AND CONTINGENCIES - $35,000) 28 (11) SR 0051, PENNSYLVANIA AVENUE BRIDGE 29 OVER BRADY'S RUN CREEK, FALLSTON 30 BOROUGH, BRIDGE REPLACEMENT 757,000 19970H0030B0757 - 42 -
1 (BASE CONSTRUCTION ALLOCATION - 2 $637,000) 3 (LAND ALLOCATION - $20,000) 4 (DESIGN AND CONTINGENCIES - $100,000) 5 (12) SR 0060, BEAVER VALLEY EXTENSION 6 SOUTHBOUND BRIDGE OVER T-535, BRIGHTON 7 TOWNSHIP, BRIDGE REHABILITATION 167,000 8 (BASE CONSTRUCTION ALLOCATION - 9 $153,000) 10 (DESIGN AND CONTINGENCIES - $14,000) 11 (13) SR 0060, BEAVER VALLEY EXTENSION 12 NORTHBOUND BRIDGE OVER T-535, BRIGHTON 13 TOWNSHIP, BRIDGE REHABILITATION 178,000 14 (BASE CONSTRUCTION ALLOCATION - 15 $163,000) 16 (DESIGN AND CONTINGENCIES - $15,000) 17 (14) SR 0060, BEAVER VALLEY EXPANSION 18 BRIDGE OVER SR 0151, HOPEWELL TOWNSHIP, 19 BRIDGE DECK REPLACEMENT 1,125,000 20 (BASE CONSTRUCTION ALLOCATION - 21 $1,000,000) 22 (DESIGN AND CONTINGENCIES - $125,000) 23 (15) SR 0588, RIVERVIEW ROAD BRIDGE OVER 24 PINE RUN, MARION TOWNSHIP, BRIDGE 25 REPLACEMENT 250,000 26 (BASE CONSTRUCTION ALLOCATION - 27 $150,000) 28 (DESIGN AND CONTINGENCIES - $100,000) 29 (16) SR 1009, HARTZEL ROAD BRIDGE OVER 30 CONNOQUENESSING CREEK, MARION TOWNSHIP, 19970H0030B0757 - 43 -
1 BRIDGE REPLACEMENT 1,150,000 2 (BASE CONSTRUCTION ALLOCATION - 3 $1,000,000) 4 (LAND ALLOCATION - $50,000) 5 (DESIGN AND CONTINGENCIES - $100,000) 6 (17) SR 1016, TATKO ROAD BRIDGE OVER BRUSH 7 CREEK, NEW SEWICKLEY TOWNSHIP, BRIDGE 8 REPLACEMENT 420,000 9 (BASE CONSTRUCTION ALLOCATION - 10 $300,000) 11 (LAND ALLOCATION - $20,000) 12 (DESIGN AND CONTINGENCIES - $100,000) 13 (18) SR 1032, NEW YORK AVENUE BRIDGE OVER 14 CONRAIL, SR 1032 AND LOCAL STREET, 15 ROCHESTER BOROUGH, BRIDGE 16 REHABILITATION 3,100,000 17 (BASE CONSTRUCTION ALLOCATION - 18 $3,000,000) 19 (DESIGN AND CONTINGENCIES - $100,000) 20 (19) SR 4035, SEBRING ROAD BRIDGE OVER SR 21 0060, BRIGHTON TOWNSHIP, BRIDGE 22 REHABILITATION 394,000 23 (BASE CONSTRUCTION ALLOCATION - 24 $361,000) 25 (DESIGN AND CONTINGENCIES - $33,000) 26 (20) SR 3032, KENDAL HARSHAVILE ROAD 27 BRIDGE OVER BRANCH OF TRAVERSE CREEK, 28 HANOVER TOWNSHIP, BRIDGE REPLACEMENT 250,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $100,000) 19970H0030B0757 - 44 -
1 (LAND ALLOCATION - $50,000) 2 (DESIGN AND CONTINGENCIES - $100,000) 3 SECTION 9. BEDFORD COUNTY. 4 (A) LOCAL BRIDGES 5 (1) BROAD TOP TOWNSHIP, T-550, MOSQUITO 6 BRIDGE OVER SIX MILE RUN, BRIDGE 7 REPLACEMENT 505,000 8 (BASE CONSTRUCTION ALLOCATION - 9 $400,000) 10 (LAND ALLOCATION - $10,000) 11 (DESIGN AND CONTINGENCIES - $95,000) 12 (2) BROAD TOP TOWNSHIP, T-553, LANGDONDALE 13 BRIDGE OVER SANDY RUN, BRIDGE 14 REPLACEMENT 395,000 15 (BASE CONSTRUCTION ALLOCATION - 16 $300,000) 17 (LAND ALLOCATION - $10,000) 18 (DESIGN AND CONTINGENCIES - $85,000) 19 (3) BROAD TOP TOWNSHIP, T-583, LONGS RUN 20 BRIDGE OVER LONGS RUN, BRIDGE 21 REPLACEMENT 395,000 22 (BASE CONSTRUCTION ALLOCATION - 23 $300,000) 24 (LAND ALLOCATION - $10,000) 25 (DESIGN AND CONTINGENCIES - $85,000) 26 (4) HARRISON TOWNSHIP, T-418, TURNER 27 COVERED BRIDGE OVER JUNIATA RIVER, 28 BRIDGE REHABILITATION 825,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $700,000) 19970H0030B0757 - 45 -
1 (LAND ALLOCATION - $25,000) 2 (DESIGN AND CONTINGENCIES - $100,000) 3 (5) MONROE TOWNSHIP, T-354, SIDELING HILL 4 OVER EAST BRANCH SIDELING HILL CREEK, 5 BRIDGE REPLACEMENT 335,000 6 (BASE CONSTRUCTION ALLOCATION - 7 $250,000) 8 (LAND ALLOCATION - $10,000) 9 (DESIGN AND CONTINGENCIES - $75,000) 10 (6) SOUTH WOODBURY TOWNSHIP, T-705 OVER 11 THREE SPRINGS RUN, BRIDGE REPLACEMENT 450,000 12 (BASE CONSTRUCTION ALLOCATION - 13 $325,000) 14 (LAND ALLOCATION - $50,000) 15 (DESIGN AND CONTINGENCIES - $75,000) 16 (7) WEST ST. CLAIR TOWNSHIP, T-565 OVER 17 DUNNING CREEK, BRIDGE REPLACEMENT 550,000 18 (BASE CONSTRUCTION ALLOCATION - 19 $450,000) 20 (LAND ALLOCATION - $25,000) 21 (DESIGN AND CONTINGENCIES - $75,000) 22 (8) LONDONDERRY TOWNSHIP, T-653 OVER WILLS 23 CREEK, BRIDGE REPLACEMENT 945,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $850,000) 26 (LAND ALLOCATION - $20,000) 27 (DESIGN AND CONTINGENCIES - $75,000) 28 (9) EAST PROVIDENCE TOWNSHIP, T-419 OVER 29 BRUSH CREEK, BRIDGE REPLACEMENT 1,170,000 30 (BASE CONSTRUCTION ALLOCATION - 19970H0030B0757 - 46 -
1 $1,000,000) 2 (LAND ALLOCATION - $20,000) 3 (DESIGN AND CONTINGENCIES - $150,000) 4 (10) BROADTOP TOWNSHIP, T-677, RIDDLESBURG 5 BRIDGE, COUNTY BRIDGE NO.35 OVER SIX 6 MILE RUN, BRIDGE REPLACEMENT 190,000 7 (BASE CONSTRUCTION ALLOCATION - 8 $150,000) 9 (LAND ALLOCATION - $5,000) 10 DESIGN AND CONTINGENCIES - $35,000) 11 (B) STATE BRIDGES 12 (1) SR 0220, US 220, NORTHBOUND BRIDGE 13 OVER PENNSYLVANIA TURNPIKE, BEDFORD 14 TOWNSHIP, BRIDGE PAINTING 180,000 15 (BASE CONSTRUCTION ALLOCATION - 16 $150,000) 17 (DESIGN AND CONTINGENCIES - $30,000) 18 (2) SR 0220, US 220, SOUTHBOUND BRIDGE 19 OVER PENNSYLVANIA TURNPIKE, BEDFORD 20 TOWNSHIP, BRIDGE PAINTING 170,000 21 (BASE CONSTRUCTION ALLOCATION - 22 $140,000) 23 (DESIGN AND CONTINGENCIES - $30,000) 24 SECTION 10. BERKS COUNTY. 25 (A) LOCAL BRIDGES 26 (1) CITY OF READING, FRITZ ISLAND BRIDGE 27 OVER ANGELICA CREEK, BRIDGE 28 REHABILITATION 23,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $20,000) 19970H0030B0757 - 47 -
1 (DESIGN AND CONTINGENCIES - $3,000) 2 (2) CITY OF READING, BERNADINE STREET OVER 3 ANGELICA CREEK, BRIDGE REHABILITATION 175,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $145,000) 6 (DESIGN AND CONTINGENCIES - $30,000) 7 (3) CITY OF READING, TULPEHOCKEN STREET 8 FOOTBRIDGE, BRIDGE REHABILITATION 6,000 9 (BASE CONSTRUCTION ALLOCATION - $5,000) 10 (DESIGN AND CONTINGENCIES - $1,000) 11 (4) WEST READING BOROUGH, MUSEUM ROAD OVER 12 WYOMISSING CREEK, BRIDGE 13 REHABILITATION 15,000 14 (BASE CONSTRUCTION ALLOCATION - 15 $12,000) 16 (DESIGN AND CONTINGENCIES - $3,000) 17 (5) AMITY TOWNSHIP, LAKE DRIVE OVER 18 TRIBUTARY OF SCHUYLKILL RIVER, BRIDGE 19 REHABILITATION 86,000 20 (BASE CONSTRUCTION ALLOCATION - 21 $75,000) 22 (DESIGN AND CONTINGENCIES - $11,000) 23 (6) AMITY TOWNSHIP, BROWNS MILL ROAD OVER 24 SPRING CREEK, BRIDGE REHABILITATION 6,000 25 (BASE CONSTRUCTION ALLOCATION - $5,000) 26 (DESIGN AND CONTINGENCIES - $1,000) 27 (7) AMITY TOWNSHIP, VALLEY ROAD OVER 28 SPRING CREEK, BRIDGE REHABILITATION 10,000 29 (BASE CONSTRUCTION ALLOCATION - $8,000) 30 (DESIGN AND CONTINGENCIES - $2,000) 19970H0030B0757 - 48 -
1 (8) AMITY TOWNSHIP, MONOCACY ROAD OVER 2 MONOCACY CREEK, BRIDGE REHABILITATION 11,000 3 (BASE CONSTRUCTION ALLOCATION - $9,000) 4 (DESIGN AND CONTINGENCIES - $2,000) 5 (9) BETHEL TOWNSHIP, T-492 OVER LITTLE 6 SWATARA CREEK, BRIDGE REPLACEMENT 700,000 7 (BASE CONSTRUCTION ALLOCATION - 8 $500,000) 9 (LAND ALLOCATION - $50,000) 10 (DESIGN AND CONTINGENCIES - $150,000) 11 (10) BETHEL TOWNSHIP, T-682 OVER CROSSKILL 12 CREEK, BRIDGE REPLACEMENT 750,000 13 (BASE CONSTRUCTION ALLOCATION - 14 $550,000) 15 (LAND ALLOCATION - $50,000) 16 (DESIGN AND CONTINGENCIES - $150,000) 17 (11) LENHARTSVILLE BOROUGH, PENN AVENUE 18 OVER MAIDEN CREEK, BRIDGE REPLACEMENT 960,000 19 (BASE CONSTRUCTION ALLOCATION - 20 $750,000) 21 (LAND ALLOCATION - $10,000) 22 (DESIGN AND CONTINGENCIES - $200,000) 23 (12) MOHNTON BOROUGH, MAIN STREET OVER 24 WYOMISSING CREEK, BRIDGE REPLACEMENT 750,000 25 (BASE CONSTRUCTION ALLOCATION - 26 $550,000) 27 (LAND ALLOCATION - $50,000) 28 (DESIGN AND CONTINGENCIES - $150,000) 29 (13) MUHLENBERG TOWNSHIP, HAIN AVENUE OVER 30 LAUREL RUN, BRIDGE REHABILITATION 100,000 19970H0030B0757 - 49 -
1 (BASE CONSTRUCTION ALLOCATION - 2 $80,000) 3 (DESIGN AND CONTINGENCIES - $20,000) 4 (14) OLEY TOWNSHIP, T-500 OVER FURNACE 5 CREEK, BRIDGE REPLACEMENT 700,000 6 (BASE CONSTRUCTION ALLOCATION - 7 $500,000) 8 (LAND ALLOCATION - $50,000) 9 (DESIGN AND CONTINGENCIES - $150,000) 10 (15) ROBESONIA BOROUGH, FREEMAN STREET 11 OVER FURNACE CREEK, BRIDGE REPLACEMENT 700,000 12 (BASE CONSTRUCTION ALLOCATION - 13 $500,000) 14 (LAND ALLOCATION - $50,000) 15 (DESIGN AND CONTINGENCIES - $150,000) 16 (16) WASHINGTON TOWNSHIP, T-884 OVER SWAMP 17 CREEK, BRIDGE REPLACEMENT 700,000 18 (BASE CONSTRUCTION ALLOCATION - 19 $500,000) 20 (LAND ALLOCATION - $50,000) 21 (DESIGN AND CONTINGENCIES - $150,000) 22 (17) UPPER BERN TOWNSHIP, MILL HILL ROAD, 23 T-712 OVER MILL CREEK, BRIDGE 24 REPLACEMENT 70,000 25 (BASE CONSTRUCTION ALLOCATION - 26 $40,000) 27 (LAND ALLOCATION - $10,000) 28 (DESIGN AND CONTINGENCIES - $20,000) 29 (18) NORTH HEIDELBERG TOWNSHIP, T-501, 30 MILESTONE ROAD BRIDGE OVER TRIBUTARY OF 19970H0030B0757 - 50 -
1 SPRING CREEK, BRIDGE REPLACEMENT 94,000 2 (BASE CONSTRUCTION ALLOCATION - 3 $82,000) 4 (LAND ALLOCATION - $4,000) 5 (DESIGN AND CONTINGENCIES - $8,000) 6 (19) ROBESON TOWNSHIP, T-366, BRIDGE OVER 7 ALLEGHENY CREEK, BRIDGE REPLACEMENT 133,000 8 (BASE CONSTRUCTION ALLOCATION - 9 $117,000) 10 (LAND ALLOCATION - $5,000) 11 (DESIGN AND CONTINGENCIES - $11,000) 12 (B) STATE BRIDGES 13 (1) SR 0010, READING ROAD OVER TRIBUTARY 14 OF CONESTOGA CREEK, CAERNARVON 15 TOWNSHIP, BRIDGE REHABILITATION 775,000 16 (BASE CONSTRUCTION ALLOCATION - 17 $490,000) 18 (LAND ALLOCATION - $100,000) 19 (DESIGN AND CONTINGENCIES - $185,000) 20 (2) SR 0222, SR 0222 NORTHBOUND OVER SR 21 0737 EXIT, MAXATAWNY TOWNSHIP, BRIDGE 22 PAINTING 45,000 23 (BASE CONSTRUCTION ALLOCATION - 24 $45,000) 25 (3) SR 0222, NORTH ELM STREET OVER SR 26 0222, KUTZTOWN BOROUGH, BRIDGE 27 PAINTING 45,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $45,000) 30 (4) SR 0222, SR 0222 NORTHBOUND OVER SR 19970H0030B0757 - 51 -
1 8015, RAMP G, MAXATAWNY TOWNSHIP, 2 BRIDGE PAINTING 45,000 3 (BASE CONSTRUCTION ALLOCATION - 4 $45,000) 5 (5) SR 0222, SR 0222 SOUTHBOUND OVER SR 6 8015, RAMP G, MAXATAWNY TOWNSHIP, 7 BRIDGE PAINTING 45,000 8 (BASE CONSTRUCTION ALLOCATION - 9 $45,000) 10 (6) SR 2038, GRIST MILL ROAD OVER 11 IRONSTONE CREEK, DOUGLASS TOWNSHIP, 12 BRIDGE REPLACEMENT 405,000 13 (BASE CONSTRUCTION ALLOCATION - 14 $235,000) 15 (LAND ALLOCATION - $70,000) 16 (DESIGN AND CONTINGENCIES - $100,000) 17 (7) SR 0073, BRIDGE OVER RAILROAD, MAIDEN 18 CREEK TOWNSHIP, BRIDGE REHABILITATION 14,000 19 (BASE CONSTRUCTION ALLOCATION - 20 $12,000) 21 (DESIGN AND CONTINGENCIES - $2,000) 22 (8) SR 2014, SPRING STREET SUBWAY, CITY OF 23 READING, BRIDGE REHABILITATION 18,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $15,000) 26 (DESIGN AND CONTINGENCIES - $3,000) 27 (9) SR 0073, SR 0073 OVER MANATAWNY CREEK, 28 OLEY TOWNSHIP, BRIDGE REHABILITATION 500,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $450,000) 19970H0030B0757 - 52 -
1 (DESIGN AND CONTINGENCIES - $50,000) 2 (10) SR 0061, SR 0061 OVER BLUE MOUNTAIN 3 RAILROAD, BOROUGH OF HAMBURG, BRIDGE 4 REHABILITATION 200,000 5 (BASE CONSTRUCTION ALLOCATION - 6 $175,000) 7 (DESIGN AND CONTINGENCIES - $25,000) 8 (11) SR 0078, SR 0078 OVER SR 1024, 9 GREENWICH TOWNSHIP, BRIDGE 10 REHABILITATION 500,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $450,000) 13 (DESIGN AND CONTINGENCIES - $50,000) 14 (12) SR 0078, SR 0078 OVER T-808, WINDSOR 15 TOWNSHIP, BRIDGE REHABILITATION 500,000 16 (BASE CONSTRUCTION ALLOCATION - 17 $450,000) 18 (DESIGN AND CONTINGENCIES - $50,000) 19 (13) SR 0078, SR 0078 OVER FIFTH STREET, 20 BOROUGH OF HAMBURG, BRIDGE 21 REHABILITATION 200,000 22 (BASE CONSTRUCTION ALLOCATION - 23 $175,000) 24 (DESIGN AND CONTINGENCIES - $25,000) 25 (14) SR 0078, SR 0078 OVER T-688, BETHEL 26 TOWNSHIP, BRIDGE REHABILITATION 250,000 27 (BASE CONSTRUCTION ALLOCATION - 28 $225,000) 29 (DESIGN AND CONTINGENCIES - $25,000) 30 (15) SR 0176, SR 0176 OVER T-568, ROBESON 19970H0030B0757 - 53 -
1 TOWNSHIP, BRIDGE REHABILITATION 250,000 2 (BASE CONSTRUCTION ALLOCATION - 3 $200,000) 4 (DESIGN AND CONTINGENCIES - $50,000) 5 (16) SR 0176, SR 0176 2/10 MILE SOUTH OF 6 SR 0422, CUMRU TOWNSHIP, BRIDGE 7 REHABILITATION 350,000 8 (BASE CONSTRUCTION ALLOCATION - 9 $300,000) 10 (DESIGN AND CONTINGENCIES - $50,000) 11 (17) SR 1083, SR 0183 OVER LITTLE 12 NORTHKILL CREEK, JEFFERSON TOWNSHIP, 13 BRIDGE REPLACEMENT 1,000,000 14 (BASE CONSTRUCTION ALLOCATION - 15 $750,000) 16 (LAND ALLOCATION - $100,000) 17 (DESIGN AND CONTINGENCIES - $150,000) 18 (18) SR 0222, SR 0222 OVER ABANDONED 19 RAILROAD, CITY OF READING, BRIDGE 20 REHABILITATION 200,000 21 (BASE CONSTRUCTION ALLOCATION - 22 $150,000) 23 (DESIGN AND CONTINGENCIES - $50,000) 24 (19) SR 0422, SR 0422 OVER TULPEHOCKEN 25 CREEK, BOROUGH OF WOMELSDORF, BRIDGE 26 REHABILITATION 200,000 27 (BASE CONSTRUCTION ALLOCATION - 28 $150,000) 29 (DESIGN AND CONTINGENCIES - $50,000) 30 (20) SR 0568, SR 0568 OVER ALLEGHENY 19970H0030B0757 - 54 -
1 CREEK, ROBESON TOWNSHIP, BRIDGE 2 REHABILITATION 100,000 3 (BASE CONSTRUCTION ALLOCATION - 4 $80,000) 5 (DESIGN AND CONTINGENCIES - $20,000) 6 (21) SR 0737, SR 0737 2.63 MILES NORTH OF 7 KUTZTOWN, GREENWICH TOWNSHIP, BRIDGE 8 REHABILITATION 500,000 9 (BASE CONSTRUCTION ALLOCATION - 10 $450,000) 11 (DESIGN AND CONTINGENCIES - $50,000) 12 (22) SR 0737, SR 0737 2.82 MILES NORTH OF 13 KUTZTOWN, GREENWICH TOWNSHIP, BRIDGE 14 REHABILITATION 500,000 15 (BASE CONSTRUCTION ALLOCATION - 16 $450,000) 17 (DESIGN AND CONTINGENCIES - $50,000) 18 (23) SR 2025, SR 2025 1/2 MILE EAST OF SR 19 0422, AMITY TOWNSHIP, BRIDGE 20 REPLACEMENT 300,000 21 (BASE CONSTRUCTION ALLOCATION - 22 $200,000) 23 (LAND ALLOCATION - $15,000) 24 (DESIGN AND CONTINGENCIES - $85,000) 25 (24) SR 2031, SR 2031 OVER HAY CREEK, 26 ROBESON TOWNSHIP, BRIDGE 27 REHABILITATION 500,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $450,000) 30 (DESIGN AND CONTINGENCIES - $50,000) 19970H0030B0757 - 55 -
1 (25) SR 2032, SR 2032 OVER TRIBUTARY OF 2 SWAMP CREEK, WASHINGTON TOWNSHIP, 3 BRIDGE REPLACEMENT 500,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $375,000) 6 (LAND ALLOCATION - $25,000) 7 (DESIGN AND CONTINGENCIES - $100,000) 8 (26) SR 2039, SR 2039 OVER SR 0422, EXETER 9 TOWNSHIP, BRIDGE REPLACEMENT 2,750,000 10 (BASE CONSTRUCTION ALLOCATION - 11 $2,000,000) 12 (LAND ALLOCATION - $250,000) 13 (DESIGN AND CONTINGENCIES - $500,000) 14 (27) SR 2041, SR 2041 2 MILES WEST OF 15 WEAVERTOWN, AMITY TOWNSHIP, BRIDGE 16 REPLACEMENT 200,000 17 (BASE CONSTRUCTION ALLOCATION - 18 $125,000) 19 (LAND ALLOCATION - $15,000) 20 (DESIGN AND CONTINGENCIES - $60,000) 21 (28) SR 2057, SR 2057 OVER LEAF CREEK, 22 AMITY TOWNSHIP, BRIDGE REPLACEMENT 600,000 23 (BASE CONSTRUCTION ALLOCATION - 24 $425,000) 25 (LAND ALLOCATION - $25,000) 26 (DESIGN AND CONTINGENCIES - $150,000) 27 (29) SR 3003, SR 3003 OVER ANGELICA CREEK, 28 CUMRU TOWNSHIP, BRIDGE REPLACEMENT 200,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $125,000) 19970H0030B0757 - 56 -
1 (LAND ALLOCATION - $15,000) 2 (DESIGN AND CONTINGENCIES - $60,000) 3 (30) SR 4026, SR 4026 OVER IRISH CREEK, 4 BOROUGH OF CENTERPORT, BRIDGE 5 REHABILITATION 250,000 6 (BASE CONSTRUCTION ALLOCATION - 7 $225,000) 8 (DESIGN AND CONTINGENCIES - $25,000) 9 (31) SR 0073, BRIDGE OVER MAIDEN CREEK, 10 ONTELAUNEE TOWNSHIP, BRIDGE 11 REPLACEMENT 2,120,000 12 (BASE CONSTRUCTION ALLOCATION - 13 $2,000,000) 14 (LAND ALLOCATION - $20,000) 15 (DESIGN AND CONTINGENCIES - $100,000) 16 Section 11. Blair County. 17 (a) Local Bridges 18 (1) Allegheny Township, Ellenberger Road, 19 Quarry Bridge over Mill Run Creek, 20 Bridge Replacement 319,000 21 (Base Construction Allocation - 22 $277,000) 23 (Design and Contingencies - $42,000) 24 (2) Antis Township, T-490, Becker Road 25 Bridge over Tributary of Little Juniata 26 River, Bridge Replacement 310,000 27 (Base Construction Allocation - 28 $250,000) 29 (Land Allocation - $10,000) 30 (Design and Contingencies - $50,000) 19970H0030B0757 - 57 -
1 (3) Taylor Township, T-332, Halter Creek 2 Bridge over Halter Creek, Bridge 3 Replacement 395,000 4 (Base Construction Allocation - 5 $300,000) 6 (Land Allocation - $10,000) 7 (Design and Contingencies - $85,000) 8 (4) GREENFIELD TOWNSHIP, T-531 OVER SOUTH <-- 9 POPLAR RUN, CONSTRUCT NEW BRIDGE 280,000 10 (BASE CONSTRUCTION ALLOCATION - 11 $200,000) 12 (LAND ALLOCATION - $20,000) 13 (DESIGN AND CONTINGENCIES - $60,000) 14 (5) GREENFIELD TOWNSHIP, T-531 OVER BIG 15 LICK BRANCH OF SOUTH POPLAR RUN, BRIDGE 16 REPLACEMENT 565,000 17 (BASE CONSTRUCTION ALLOCATION - 18 $465,000) 19 (LAND ALLOCATION - $30,000) 20 (DESIGN AND CONTINGENCIES - $70,000) 21 (6) GREENFIELD TOWNSHIP, COUNTY ROAD 101 22 OVER POLECAT RUN, BRIDGE REPLACEMENT 520,000 23 (BASE CONSTRUCTION ALLOCATION - 24 $400,000) 25 (LAND ALLOCATION - $20,000) 26 (DESIGN AND CONTINGENCIES - $100,000) 27 (7) NEWRY BOROUGH, ALLEGHENY STREET OVER 28 TRIBUTARY OF POPLAR RUN, BRIDGE 29 REHABILITATION 425,000 30 (BASE CONSTRUCTION ALLOCATION - 19970H0030B0757 - 58 -
1 $350,000) 2 (LAND ALLOCATION - $25,000) 3 (DESIGN AND CONTINGENCIES - $50,000) 4 (b) State Bridges 5 (1) SR 4004, 58th Street Bridge over Mill 6 Run Creek, City of Altoona, Bridge 7 Replacement 598,000 8 (Base Construction Allocation - 9 $520,000) 10 (Design and Contingencies - $78,000) 11 (2) SR 0022, Canal Park Bridges over the 12 Juniata River, Hollidaysburg Borough, 13 Bridge Replacement 3,000,000 14 (Base Construction Allocation - 15 $2,000,000) 16 (Land Allocation - $650,000) 17 (Design and Contingencies - $350,000) 18 (3) SR 4008, SR 4008 OVER TRIBUTARY OF <-- 19 GLENWHITE RUN, LOGAN TOWNSHIP, BRIDGE 20 REPLACEMENT 240,000 21 (BASE CONSTRUCTION ALLOCATION - 22 $200,000) 23 (LAND ALLOCATION - $5,000) 24 (DESIGN AND CONTINGENCIES - $35,000) 25 Section 12. Bradford County. 26 (a) Local Bridges 27 (1) Canton Township, T-889, County Bridge 28 No.45 over Towanda Creek, Bridge 29 Replacement 480,000 30 (Base Construction Allocation - 19970H0030B0757 - 59 -
1 $400,000) 2 (Land Allocation - $25,000) 3 (Design and Contingencies - $55,000) 4 (2) Tuscarora Township, T-874, County 5 Bridge No.36 over Fargo Creek, Bridge 6 Replacement 265,000 7 (Base Construction Allocation - 8 $215,000) 9 (Land Allocation - $15,000) 10 (Design and Contingencies - $35,000) 11 (3) Franklin Township, T-358, County 12 Bridge No.12 over Towanda Creek, Bridge 13 Replacement 1,020,000 14 (Base Construction Allocation - 15 $850,000) 16 (Land Allocation - $50,000) 17 (Design and Contingencies - $120,000) 18 (4) Litchfield Township, T-900 over Parks 19 Creek, Park Creek Structure Bridge, 20 Bridge Replacement 390,000 21 (Base Construction Allocation - 22 $220,000) 23 (Land Allocation - $20,000) 24 (Design and Contingencies - $150,000) 25 (b) State Bridges (Reserved) <-- 26 Section 13. Bucks County (Reserved). 27 Section 14. Butler County (Reserved). 28 Section 15. Cambria County (Reserved). 29 Section 16. Cameron County (Reserved). 30 Section 17. Carbon County (Reserved). 19970H0030B0757 - 60 -
1 Section 18. Centre County (Reserved). 2 Section 19. Chester County (Reserved). 3 Section 20. Clarion County (Reserved). 4 Section 21. Clearfield County (Reserved). 5 Section 22. Clinton County (Reserved). 6 Section 23. Columbia County (Reserved). 7 Section 24. Crawford County (Reserved). 8 Section 25. Cumberland County (Reserved). 9 Section 26. Dauphin County (Reserved). 10 Section 27. Delaware County (Reserved). 11 Section 28. Elk County (Reserved). 12 Section 29. Erie County (Reserved). 13 Section 30. Fayette County (Reserved). 14 Section 31. Forest County (Reserved). 15 Section 32. Franklin County (Reserved). 16 Section 33. Fulton County (Reserved). 17 Section 34. Greene County (Reserved). 18 Section 35. Huntingdon County (Reserved). 19 Section 36. Indiana County (Reserved). 20 Section 37. Jefferson County (Reserved). 21 Section 38. Juniata County (Reserved). 22 Section 39. Lackawanna County (Reserved). 23 Section 40. Lancaster County (Reserved). 24 Section 41. Lawrence County (Reserved). 25 Section 42. Lebanon County (Reserved). 26 Section 43. Lehigh County (Reserved). 27 Section 44. Luzerne County (Reserved). 28 Section 45. Lycoming County (Reserved). 29 Section 46. McKean County (Reserved). 30 Section 47. Mercer County (Reserved). 19970H0030B0757 - 61 -
1 Section 48. Mifflin County (Reserved). 2 Section 49. Monroe County (Reserved). 3 Section 50. Montgomery County (Reserved). 4 Section 51. Montour County (Reserved). 5 Section 52. Northampton County (Reserved). 6 Section 53. Northumberland County (Reserved). 7 Section 54. Perry County (Reserved). 8 Section 55. Philadelphia County (Reserved). 9 Section 56. Pike County (Reserved). 10 Section 57. Potter County (Reserved). 11 Section 58. Schuylkill County (Reserved). 12 Section 59. Snyder County (Reserved). 13 Section 60. Somerset County (Reserved). 14 Section 61. Sullivan County (Reserved). 15 Section 62. Susquehanna County (Reserved). 16 Section 63. Tioga County (Reserved). 17 Section 64. Union County (Reserved). 18 Section 65. Venango County (Reserved). 19 Section 66. Warren County (Reserved). 20 Section 67. Washington County (Reserved). 21 Section 68. Wayne County (Reserved). 22 Section 69. Westmoreland County (Reserved). 23 Section 70. Wyoming County (Reserved). 24 Section 71. York County (Reserved). 25 (5) BURLINGTON TOWNSHIP, T-547 OVER WALLIS <-- 26 RUN, BRIDGE REPLACEMENT 395,000 27 (BASE CONSTRUCTION ALLOCATION - 28 $310,000) 29 (LAND ALLOCATION - $10,000) 30 (DESIGN AND CONTINGENCIES - $75,000) 19970H0030B0757 - 62 -
1 (6) PIKE TOWNSHIP, T-790 OVER GAYLORD 2 CREEK AND SOUTH CREEK, BRIDGE 3 REPLACEMENT 495,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $410,000) 6 (LAND ALLOCATION - $10,000) 7 (DESIGN AND CONTINGENCIES - $75,000) 8 (B) STATE BRIDGES 9 (1) SR 0006, NORTH BRIDGE OVER SUGAR 10 CREEK, SOUTH OF LONGS POND ROAD, BRIDGE 11 REPLACEMENT 1,139,000 12 (BASE CONSTRUCTION ALLOCATION - 13 $911,000) 14 (LAND ALLOCATION - $57,000) 15 (DESIGN AND CONTINGENCIES - $171,000) 16 (2) SR 0409, BILLING CREEK BRIDGE, VILLAGE 17 OF CAMPTOWN, BRIDGE REPLACEMENT 318,000 18 (BASE CONSTRUCTION ALLOCATION - 19 $254,000) 20 (LAND ALLOCATION - $16,000) 21 (DESIGN AND CONTINGENCIES - $48,000) 22 (3) SR 3029, TOWANDA CREEK BRIDGES BETWEEN 23 T-327 AND T-326 ON GULF ROAD, VILLAGE 24 OF GRANVILLE CENTER, BRIDGE 25 REPLACEMENT 593,000 26 (BASE CONSTRUCTION ALLOCATION - 27 $474,000) 28 (LAND ALLOCATION - $30,000) 29 (DESIGN AND CONTINGENCIES - $89,000) 30 (4) SR 4008, BRIDGE OVER TRIBUTARY OF 19970H0030B0757 - 63 -
1 SUGAR CREEK, COLUMBIA TOWNSHIP, BRIDGE 2 REPLACEMENT 298,000 3 (BASE CONSTRUCTION ALLOCATION - 4 $238,000) 5 (LAND ALLOCATION - $15,000) 6 (DESIGN AND CONTINGENCIES - $45,000) 7 (5) SR 0414, BRIDGE OVER TOWANDA CREEK, 8 BRADFORD BOROUGH, BRIDGE PAINTING 195,000 9 (BASE CONSTRUCTION ALLOCATION - 10 $185,000) 11 (DESIGN AND CONTINGENCIES - $10,000) 12 (6) US 6, US 6 OVER SUGAR CREEK, SYLVANIA 13 BOROUGH, BRIDGE REPLACEMENT 633,000 14 (BASE CONSTRUCTION ALLOCATION - 15 $506,000) 16 (LAND ALLOCATION - $32,000) 17 (DESIGN AND CONTINGENCIES - $95,000) 18 (7) SR 0014, SR 0014 OVER TRIBUTARY OF 19 SUGAR CREEK, TROY TOWNSHIP, BRIDGE 20 REPLACEMENT 410,000 21 (BASE CONSTRUCTION ALLOCATION - 22 $280,000) 23 (LAND ALLOCATION - $30,000) 24 (DESIGN AND CONTINGENCIES - $100,000) 25 (8) SR 0187, SR 0187 OVER WAPPENSING 26 CREEK, WINDHAM TOWNSHIP, BRIDGE 27 REPLACEMENT 2,000,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $1,600,000) 30 (LAND ALLOCATION - $100,000) 19970H0030B0757 - 64 -
1 (DESIGN AND CONTINGENCIES - $300,000) 2 (9) SR 0414, SR 0414 OVER TRIBUTARY OF 3 TOWANDA CREEK, CANTON TOWNSHIP, BRIDGE 4 REPLACEMENT 320,000 5 (BASE CONSTRUCTION ALLOCATION - 6 $256,000) 7 (LAND ALLOCATION - $16,000) 8 (DESIGN AND CONTINGENCIES - $48,000) 9 (10) SR 0467, SR 0467 OVER JOHNSONS CREEK, 10 ORWELL TOWNSHIP, BRIDGE REPLACEMENT 751,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $601,000) 13 (LAND ALLOCATION - $37,000) 14 (DESIGN AND CONTINGENCIES - $113,000) 15 (11) SR 0514, SR 0514 OVER NORTH BRANCH OF 16 TOWANDA CREEK, GRANVILLE TOWNSHIP, 17 BRIDGE REPLACEMENT 638,000 18 (BASE CONSTRUCTION ALLOCATION - 19 $510,000) 20 (LAND ALLOCATION - $32,000) 21 (DESIGN AND CONTINGENCIES - $96,000) 22 (12) SR 1022, ULSTER BRIDGE, ULSTER 23 TOWNSHIP, BRIDGE PAINTING 6,299,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $5,039,000) 26 (LAND ALLOCATION - $315,000) 27 (DESIGN AND CONTINGENCIES - $945,000) 28 (13) SR 1026, SR 1026 OVER WYALUSING 29 CREEK, PIKE TOWNSHIP, BRIDGE 30 REPLACEMENT 650,000 19970H0030B0757 - 65 -
1 (BASE CONSTRUCTION ALLOCATION - 2 $520,000) 3 (LAND ALLOCATION - $30,000) 4 (DESIGN AND CONTINGENCIES - $100,000) 5 (14) SR 1049, SR 1049 OVER TRIBUTARY OF 6 PENDLETON CREEK, WARREN TOWNSHIP, 7 BRIDGE REPLACEMENT 340,000 8 (BASE CONSTRUCTION ALLOCATION - 9 $270,000) 10 (LAND ALLOCATION - $15,000) 11 (DESIGN AND CONTINGENCIES - $55,000) 12 (15) SR 1055, SR 1055 OVER PARKS CREEK, 13 ROME TOWNSHIP, BRIDGE REPLACEMENT 315,000 14 (BASE CONSTRUCTION ALLOCATION - 15 $250,000) 16 (LAND ALLOCATION - $15,000) 17 (DESIGN AND CONTINGENCIES - $50,000) 18 (16) SR 2018, SR 2018 OVER TRIBUTARY OF 19 SUSQUEHANNA RIVER, ASYLUM TOWNSHIP, 20 BRIDGE REPLACEMENT 260,000 21 (BASE CONSTRUCTION ALLOCATION - 22 $208,000) 23 (LAND ALLOCATION - $39,000) 24 (DESIGN AND CONTINGENCIES - $13,000) 25 (17) SR 3005, SR 3005 OVER TOWANDA CREEK, 26 CANTON TOWNSHIP, BRIDGE REPLACEMENT 666,000 27 (BASE CONSTRUCTION ALLOCATION - 28 $533,000) 29 (LAND ALLOCATION - $33,000) 30 (DESIGN AND CONTINGENCIES - $100,000) 19970H0030B0757 - 66 -
1 (18) SR 3029, SR 3029 OVER MUD CREEK, TROY 2 TOWNSHIP, BRIDGE REPLACEMENT 457,000 3 (BASE CONSTRUCTION ALLOCATION - 4 $366,000) 5 (LAND ALLOCATION - $23,000) 6 (DESIGN AND CONTINGENCIES - $68,000) 7 (19) SR 4002, SR 4002 OVER BROWNS CREEK, 8 BURLINGTON TOWNSHIP, BRIDGE 9 REPLACEMENT 561,000 10 (BASE CONSTRUCTION ALLOCATION - 11 $449,000) 12 (LAND ALLOCATION - $28,000) 13 (DESIGN AND CONTINGENCIES - $84,000) 14 (20) SR 4013, SR 4013 OVER JUSTICE RUN, 15 RIDGEBURY TOWNSHIP, BRIDGE REPLACEMENT 351,000 16 (BASE CONSTRUCTION ALLOCATION - 17 $281,000) 18 (LAND ALLOCATION - $18,000) 19 (DESIGN AND CONTINGENCIES - $52,000) 20 (21) SR 4014, SR 4014 OVER BRANCH OF 21 TOMJACK CREEK, SMITHFIELD TOWNSHIP, 22 BRIDGE REPLACEMENT 360,000 23 (BASE CONSTRUCTION ALLOCATION - 24 $288,000) 25 (LAND ALLOCATION - $18,000) 26 (DESIGN AND CONTINGENCIES - $54,000) 27 (22) SR 4015, SR 4015 OVER MILL CREEK, 28 SPRINGFIELD TOWNSHIP, BRIDGE 29 REPLACEMENT 390,000 30 (BASE CONSTRUCTION ALLOCATION - 19970H0030B0757 - 67 -
1 $312,000) 2 (LAND ALLOCATION - $20,000) 3 (DESIGN AND CONTINGENCIES - $58,000) 4 (23) SR 4031, SR 4031 OVER TRIBUTARY OF 5 BECKWITH CREEK, WELLS TOWNSHIP, BRIDGE 6 REPLACEMENT 243,000 7 (BASE CONSTRUCTION ALLOCATION - 8 $196,000) 9 (LAND ALLOCATION - $10,000) 10 (DESIGN AND CONTINGENCIES - $37,000) 11 SECTION 13. BUCKS COUNTY. 12 (A) LOCAL BRIDGES 13 (1) SPRINGFIELD TOWNSHIP, I-479, BRIDGE 14 STREET BRIDGE OVER COOKS CREEK, BRIDGE 15 REPLACEMENT 500,000 16 (BASE CONSTRUCTION ALLOCATION - 17 $365,000) 18 (LAND ALLOCATION - $35,000) 19 (DESIGN AND CONTINGENCIES - $100,000) 20 (2) SPRINGFIELD TOWNSHIP, T-404, HAWKS 21 MILL COUNTY BRIDGE NO.196, SHALE ROAD 22 OVER COOKS CREEK, BRIDGE 23 REHABILITATION 100,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $90,000) 26 (DESIGN AND CONTINGENCIES - $10,000) 27 (B) STATE BRIDGES 28 (1) SR 0032, RIVER ROAD AT FLEECYDALE OVER 29 PAUNACUSSING CREEK, SOLEBURY TOWNSHIP, 30 BRIDGE REPLACEMENT 1,400,000 19970H0030B0757 - 68 -
1 (BASE CONSTRUCTION ALLOCATION - 2 $1,200,000) 3 (DESIGN AND CONTINGENCIES - $200,000) 4 (2) SR 2002, OTTER STREET BRIDGE OVER 5 OTTER CREEK, BRISTOL BOROUGH, BRIDGE 6 REPLACEMENT 1,150,000 7 (BASE CONSTRUCTION ALLOCATION - 8 $900,000) 9 (LAND ALLOCATION - $50,000) 10 (DESIGN AND CONTINGENCIES - $200,000) 11 (3) SR 2025, BRISTOL ROAD BRIDGE OVER 12 LITTLE NESHAMINY CREEK, WARWICK 13 TOWNSHIP, BRIDGE REPLACEMENT 1,120,000 14 (BASE CONSTRUCTION ALLOCATION - 15 $900,000) 16 (LAND ALLOCATION - $80,000) 17 (DESIGN AND CONTINGENCIES - $140,000) 18 (4) SR 2047, HULMEVILLE AVENUE BRIDGE OVER 19 CONRAIL, MIDDLETOWN, BRIDGE 20 REPLACEMENT 5,600,000 21 (BASE CONSTRUCTION ALLOCATION - 22 $4,000,000) 23 (LAND ALLOCATION - $800,000) 24 (DESIGN AND CONTINGENCIES - $800,000) 25 (5) SR 4033, UPPER RIDGE ROAD BRIDGE OVER 26 UNAMI CREEK, MILFORD TOWNSHIP, BRIDGE 27 REPLACEMENT 2,000,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $1,600,000) 30 (LAND ALLOCATION - $100,000) 19970H0030B0757 - 69 -
1 (DESIGN AND CONTINGENCIES - $300,000) 2 (6) SR 4091, KELLERS CHURCH ROAD BRIDGE 3 OVER DEEP RUN, BEDMINSTER, BRIDGE 4 REPLACEMENT 2,000,000 5 (BASE CONSTRUCTION ALLOCATION - 6 $1,500,000) 7 (LAND ALLOCATION - $150,000) 8 (DESIGN AND CONTINGENCIES - $350,000) 9 (7) SR 0202, DOYLESTOWN BYPASS (FIVE 10 BRIDGES) OVER SR 0611, DOYLESTOWN 11 TOWNSHIP, BRIDGE REHABILITATIONS 2,200,000 12 (BASE CONSTRUCTION ALLOCATION - 13 $2,000,000) 14 (LAND ALLOCATION - $50,000) 15 (DESIGN AND CONTINGENCIES - $150,000) 16 (8) SR 0611, EASTON ROAD (TWO BRIDGES) 17 OVER TOHICKON AND DEEP RUN CREEKS, 18 BEDMINISTER TOWNSHIP, BRIDGE 19 REPLACEMENTS 1,650,000 20 (BASE CONSTRUCTION ALLOCATION - 21 $1,500,000) 22 (LAND ALLOCATION - $50,000) 23 (DESIGN AND CONTINGENCIES - $100,000) 24 (9) SR 2089, ALMSHOUSE ROAD BRIDGE OVER 25 NESHAMINY CREEK, DOYLESTOWN TOWNSHIP, 26 BRIDGE REPLACEMENT 1,800,000 27 (BASE CONSTRUCTION ALLOCATION - 28 $1,500,000) 29 (LAND ALLOCATION - $150,000) 30 (DESIGN AND CONTINGENCIES - $150,000) 19970H0030B0757 - 70 -
1 (10) SR 0013, BRISTOL PIKE OVER OTTER 2 CREEK, BRISTOL TOWNSHIP, BRIDGE 3 REPLACEMENT 1,600,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $1,200,000) 6 (LAND ALLOCATION - $100,000) 7 (DESIGN AND CONTINGENCIES - $300,000) 8 (11) SR 0413, BRIDGE OVER MILL CREEK, 9 BRISTOL TOWNSHIP, BRIDGE REPLACEMENT 600,000 10 (BASE CONSTRUCTION ALLOCATION - 11 $350,000) 12 (LAND ALLOCATION - $50,000) 13 (DESIGN AND CONTINGENCIES - $200,000) 14 (12) SR 2002, STATE ROAD OVER NESHAMINY 15 CREEK, BRISTOL TOWNSHIP, BRIDGE 16 REPLACEMENT 3,700,000 17 (BASE CONSTRUCTION ALLOCATION - 18 $3,000,000) 19 (LAND ALLOCATION - $250,000) 20 (DESIGN AND CONTINGENCIES - $450,000) 21 (13) SR 0013, BRISTOL PIKE OVER ST. 22 FRANCIS CREEK, BENSALEM TOWNSHIP, 23 BRIDGE REPLACEMENT 550,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $400,000) 26 (LAND ALLOCATION - $50,000) 27 (DESIGN AND CONTINGENCIES - $100,000) 28 (14) SR 0013, SR 0013 OVER CONRAIL AND 29 NEWBOLD ROAD, FALLS TOWNSHIP, BRIDGE 30 REPLACEMENT 5,000,000 19970H0030B0757 - 71 -
1 (BASE CONSTRUCTION ALLOCATION - 2 $4,500,000) 3 (LAND ALLOCATION - $150,000) 4 (DESIGN AND CONTINGENCIES - $350,000) 5 (15) SR 0032, WEST BRIDGE STREET OVER 6 TRIBUTARY OF DELAWARE RIVER, 7 MORRISVILLE BOROUGH, BRIDGE 8 REPLACEMENT 550,000 9 (BASE CONSTRUCTION ALLOCATION - 10 $400,000) 11 (LAND ALLOCATION - $50,000) 12 (DESIGN AND CONTINGENCIES - $100,000) 13 (16) SR 0213, WEST MAPLE AVENUE OVER 14 NESHAMINY CREEK, MIDDLETOWN TOWNSHIP, 15 BRIDGE REPLACEMENT 2,000,000 16 (BASE CONSTRUCTION ALLOCATION - 17 $1,700,000) 18 (LAND ALLOCATION - $100,000) 19 (DESIGN AND CONTINGENCIES - $200,000) 20 (17) SR 1004, COLD SPRING CREAMERY ROAD 21 OVER BRANCH OF PINE RUN CREEK, 22 BUCKINGHAM TOWNSHIP, BRIDGE 23 REPLACEMENT 450,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $380,000) 26 (LAND ALLOCATION - $10,000) 27 (DESIGN AND CONTINGENCIES - $60,000) 28 (18) SR 2005, CORNWELLS AVENUE OVER 29 POQUESSING CREEK, BENSALEM TOWNSHIP, 30 BRIDGE REPLACEMENT 350,000 19970H0030B0757 - 72 -
1 (BASE CONSTRUCTION ALLOCATION - 2 $250,000) 3 (LAND ALLOCATION - $25,000) 4 (DESIGN AND CONTINGENCIES - $75,000) 5 (19) SR 2026, TRENTON AVENUE OVER ROCK 6 RUN, FALLS TOWNSHIP, BRIDGE 7 REPLACEMENT 700,000 8 (BASE CONSTRUCTION ALLOCATION - 9 $500,000) 10 (LAND ALLOCATION - $50,000) 11 (DESIGN AND CONTINGENCIES - $150,000) 12 (20) SR 2037, LINCOLN HIGHWAY EASTBOUND 13 OVER QUEEN ANNE CREEK, FALLS TOWNSHIP, 14 BRIDGE REPLACEMENT 700,000 15 (BASE CONSTRUCTION ALLOCATION - 16 $500,000) 17 (LAND ALLOCATION - $75,000) 18 (DESIGN AND CONTINGENCIES - $125,000) 19 (21) SR 2037, LINCOLN HIGHWAY OVER BRANCH 20 OF QUEEN ANNE CREEK, FALLS TOWNSHIP, 21 BRIDGE REPLACEMENT 500,000 22 (BASE CONSTRUCTION ALLOCATION - 23 $350,000) 24 (LAND ALLOCATION - $50,000) 25 (DESIGN AND CONTINGENCIES - $100,000) 26 (22) SR 2047, HULMEVILLE AVENUE OVER 27 CONRAIL, MIDDLETOWN TOWNSHIP, BRIDGE 28 REPLACEMENT 1,200,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $1,000,000) 19970H0030B0757 - 73 -
1 (LAND ALLOCATION - $75,000) 2 (DESIGN AND CONTINGENCIES - $125,000) 3 (23) SR 2051, LEVITTOWN PARKWAY - 4 SUPERELEVATION OF LEVITTOWN PARKWAY, 5 CONSTRUCTION OF MEDIAN BARRIERS AND 6 DRAINAGE IMPROVEMENTS 810,000 7 (BASE CONSTRUCTION ALLOCATION - 8 $810,000) 9 (24) SR 0413, LOWER ROADWAY OF SR 0413 10 BENEATH AMTRAK BRIDGE AT INTERSECTION 11 WITH SR 0013 2,200,000 12 (BASE CONSTRUCTION ALLOCATION - 13 $2,000,000) 14 (DESIGN AND CONTINGENCIES - $200,000) 15 SECTION 14. BUTLER COUNTY. 16 (A) LOCAL BRIDGES 17 (1) MUDDY CREEK AND WORTH TOWNSHIPS, T- 18 348, MUDDY CREEK BRIDGE OVER MUDDY 19 CREEK, BRIDGE REPLACEMENT 730,000 20 (BASE CONSTRUCTION ALLOCATION - 21 $550,000) 22 (LAND ALLOCATION - $15,000) 23 (DESIGN AND CONTINGENCIES - $165,000) 24 (2) ALLEGHENY TOWNSHIP, T-542, FARRINGTON 25 BRIDGE, BRIDGE REPLACEMENT 700,000 26 (BASE CONSTRUCTION ALLOCATION - 27 $500,000) 28 (LAND ALLOCATION - $25,000) 29 (DESIGN AND CONTINGENCIES - $175,000) 30 (3) CONCORD TOWNSHIP, T-508, GREECE CITY 19970H0030B0757 - 74 -
1 BRIDGE, BRIDGE REPLACEMENT 700,000 2 (BASE CONSTRUCTION ALLOCATION - 3 $500,000) 4 (LAND ALLOCATION - $25,000) 5 (DESIGN AND CONTINGENCIES - $175,000) 6 (4) CRANBERRY TOWNSHIP, T-326 OVER BRUSH 7 CREEK, BRIDGE REPLACEMENT 700,000 8 (BASE CONSTRUCTION ALLOCATION - 9 $500,000) 10 (LAND ALLOCATION - $25,000) 11 (DESIGN AND CONTINGENCIES - $175,000) 12 (5) CRANBERRY TOWNSHIP, T-300, BRIDGE 13 REPLACEMENT 700,000 14 (BASE CONSTRUCTION ALLOCATION - 15 $500,000) 16 (LAND ALLOCATION - $25,000) 17 (DESIGN AND CONTINGENCIES - $175,000) 18 (6) JACKSON TOWNSHIP, T-323, SENN BRIDGE, 19 BRIDGE REPLACEMENT 700,000 20 (BASE CONSTRUCTION ALLOCATION - 21 $500,000) 22 (LAND ALLOCATION - $25,000) 23 (DESIGN AND CONTINGENCIES - $175,000) 24 (7) JACKSON TOWNSHIP, T-325, EIDEWAU 25 BRIDGE, BRIDGE REPLACEMENT 700,000 26 (BASE CONSTRUCTION ALLOCATION - 27 $500,000) 28 (LAND ALLOCATION - $25,000) 29 (DESIGN AND CONTINGENCIES - $175,000) 30 (8) JEFFERSON TOWNSHIP, T-844 OVER THORN 19970H0030B0757 - 75 -
1 CREEK, BRIDGE REPLACEMENT 700,000 2 (BASE CONSTRUCTION ALLOCATION - 3 $500,000) 4 (LAND ALLOCATION - $25,000) 5 (DESIGN AND CONTINGENCIES - $175,000) 6 (9) MARS BOROUGH, HOOK STREET, BRIDGE 7 REPLACEMENT 700,000 8 (BASE CONSTRUCTION ALLOCATION - 9 $500,000) 10 (LAND ALLOCATION - $25,000) 11 (DESIGN AND CONTINGENCIES - $175,000) 12 (10) MARS BOROUGH, CHURCH STREET, KOCHER 13 BRIDGE, BRIDGE REPLACEMENT 700,000 14 (BASE CONSTRUCTION ALLOCATION - 15 $500,000) 16 (LAND ALLOCATION - $25,000) 17 (DESIGN AND CONTINGENCIES - $175,000) 18 (11) MIDDLESEX TOWNSHIP, T-380 OVER GLADE 19 RUN, BRIDGE REPLACEMENT 700,000 20 (BASE CONSTRUCTION ALLOCATION - 21 $500,000) 22 (LAND ALLOCATION - $25,000) 23 (DESIGN AND CONTINGENCIES - $175,000) 24 (12) WORTH TOWNSHIP, T-318, PAYNE BRIDGE, 25 BRIDGE REPLACEMENT 700,000 26 (BASE CONSTRUCTION ALLOCATION - 27 $500,000) 28 (LAND ALLOCATION - $25,000) 29 (DESIGN AND CONTINGENCIES - $175,000) 30 (13) CRANBERRY TOWNSHIP, T-326 OVER 19970H0030B0757 - 76 -
1 TRIBUTARY OF BRUSH CREEK, BRIDGE 2 REPLACEMENT 167,000 3 (BASE CONSTRUCTION ALLOCATION - 4 $135,000) 5 (LAND ALLOCATION - $19,000) 6 (DESIGN AND CONTINGENCIES - $13,000) 7 (B) STATE BRIDGES 8 (1) SR 0228, HOUSEVILLE BRIDGE OVER B&LE 9 RAILROAD, CLINTON TOWNSHIP, BRIDGE DECK 10 REPLACEMENT 636,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $600,000) 13 (DESIGN AND CONTINGENCIES - $36,000) 14 (2) SR 0019, ROSE POINT BRIDGE OVER SR 15 0422, MUDDYCREEK TOWNSHIP, BRIDGE 16 PAINTING 115,000 17 (BASE CONSTRUCTION ALLOCATION - 18 $100,000) 19 (DESIGN AND CONTINGENCIES - $15,000) 20 (3) SR 0058, BLOCKS RUN BRIDGE NO.1 OVER 21 BLOCKS RUN, MARION TOWNSHIP, BRIDGE 22 PAINTING 65,000 23 (BASE CONSTRUCTION ALLOCATION - 24 $50,000) 25 (DESIGN AND CONTINGENCIES - $15,000) 26 (4) SR 0058, BLOCKS RUN BRIDGE NO.2 OVER 27 BLOCKS RUN, VENANGO TOWNSHIP, BRIDGE 28 PAINTING 60,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $45,000) 19970H0030B0757 - 77 -
1 (DESIGN AND CONTINGENCIES - $15,000) 2 (5) SR 0058, MURRIN RUN BRIDGE OVER MURRIN 3 RUN, VENANGO TOWNSHIP, BRIDGE PAINTING 60,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $45,000) 6 (DESIGN AND CONTINGENCIES - $15,000) 7 (6) SR 0068, GLADE RUN BRIDGE OVER GLADE 8 RUN, ZELIENOPLE BOROUGH, BRIDGE 9 PAINTING 70,000 10 (BASE CONSTRUCTION ALLOCATION - 11 $55,000) 12 (DESIGN AND CONTINGENCIES - $15,000) 13 (7) SR 0079, MUDDY CREEK BRIDGE NORTHBOUND 14 OVER SR 0422 AND MUDDY CREEK, MUDDY 15 CREEK TOWNSHIP, BRIDGE PAINTING 255,000 16 (BASE CONSTRUCTION ALLOCATION - 17 $240,000) 18 (DESIGN AND CONTINGENCIES - $15,000) 19 (8) SR 0079, MUDDY CREEK BRIDGE SOUTHBOUND 20 OVER SR 0422 AND MUDDY CREEK, MUDDY 21 CREEK TOWNSHIP, BRIDGE PAINTING 255,000 22 (BASE CONSTRUCTION ALLOCATION - 23 $240,000) 24 (DESIGN AND CONTINGENCIES - $15,000) 25 (9) SR 0108, SLIPPERY ROCK EXIT BRIDGE 26 OVER I-79, WORTH TOWNSHIP, BRIDGE 27 PAINTING 225,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $210,000) 30 (DESIGN AND CONTINGENCIES - $15,000) 19970H0030B0757 - 78 -
1 (10) SR 0138, GLADES WILDLIFE LAKE BRIDGE 2 OVER SOUTH BRANCH OF SLIPPERY ROCK 3 CREEK, CONCORD TOWNSHIP, BRIDGE 4 PAINTING 85,000 5 (BASE CONSTRUCTION ALLOCATION - 6 $70,000) 7 (DESIGN AND CONTINGENCIES - $15,000) 8 (11) SR 0258, WOLF CREEK BRIDGE OVER WOLF 9 CREEK, SLIPPERY ROCK TOWNSHIP, BRIDGE 10 PAINTING 125,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $110,000) 13 (DESIGN AND CONTINGENCIES - $15,000) 14 (12) SR 0308, RENICK BRIDGE OVER STONEY 15 RUN AND RAILROAD, CENTER TOWNSHIP, 16 BRIDGE PAINTING 405,000 17 (BASE CONSTRUCTION ALLOCATION - 18 $390,000) 19 (DESIGN AND CONTINGENCIES - $15,000) 20 (13) SR 0422, MOUNT CHESTNUT BRIDGE 21 EASTBOUND OVER LITTLE CONNOQUENESSING 22 CREEK AND SR 3007, BUTLER TOWNSHIP, 23 BRIDGE PAINTING 355,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $340,000) 26 (DESIGN AND CONTINGENCIES - $15,000) 27 (14) SR 0422, BONNIE BROOK BRIDGE OVER 28 BONNIE BROOK, SUMMIT TOWNSHIP, BRIDGE 29 PAINTING 90,000 30 (BASE CONSTRUCTION ALLOCATION - 19970H0030B0757 - 79 -
1 $75,000) 2 (DESIGN AND CONTINGENCIES - $15,000) 3 (15) SR 1004, BRUIN BRIDGE OVER BEAR 4 CREEK, BRUIN BOROUGH, BRIDGE PAINTING 85,000 5 (BASE CONSTRUCTION ALLOCATION - 6 $70,000) 7 (DESIGN AND CONTINGENCIES - $15,000) 8 (16) SR 1011, RATTIGAN BRIDGE NO.1 OVER 9 BUFFALO CREEK, DONEGAL TOWNSHIP, BRIDGE 10 PAINTING 55,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $40,000) 13 (DESIGN AND CONTINGENCIES - $15,000) 14 (17) SR 1016, EASTLAND DRIVE BRIDGE OVER 15 CONNOQUENESSING CREEK, BUTLER TOWNSHIP, 16 BRIDGE PAINTING 80,000 17 (BASE CONSTRUCTION ALLOCATION - 18 $65,000) 19 (DESIGN AND CONTINGENCIES - $15,000) 20 (18) SR 1019, ROUGH RUN BRIDGE OVER ROUGH 21 RUN, WINDFIELD TOWNSHIP, BRIDGE 22 PAINTING 95,000 23 (BASE CONSTRUCTION ALLOCATION - 24 $80,000) 25 (DESIGN AND CONTINGENCIES - $15,000) 26 (19) SR 1019, CHICORA BRIDGE OVER BUFFALO 27 CREEK, CHICORA BOROUGH, BRIDGE 28 PAINTING 70,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $55,000) 19970H0030B0757 - 80 -
1 (DESIGN AND CONTINGENCIES - $15,000) 2 (20) SR 1021, RATTIGAN BRIDGE NO.2 OVER 3 BUFFALO CREEK, DONEGAL TOWNSHIP, BRIDGE 4 PAINTING 70,000 5 (BASE CONSTRUCTION ALLOCATION - 6 $55,000) 7 (DESIGN AND CONTINGENCIES - $15,000) 8 (21) SR 1025, BONNIE BROOK BRIDGE NO.1 9 OVER BONNIE BROOK, SUMMIT TOWNSHIP, 10 BRIDGE PAINTING 90,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $75,000) 13 (DESIGN AND CONTINGENCIES - $15,000) 14 (22) SR 2004, CONNOQUENESSING CREEK BRIDGE 15 OVER CONNOQUENESSING CREEK, BUTLER 16 CITY, BRIDGE PAINTING 135,000 17 (BASE CONSTRUCTION ALLOCATION - 18 $120,000) 19 (DESIGN AND CONTINGENCIES - $15,000) 20 (23) SR 2004, BONNIE BROOK BRIDGE NO.2 21 OVER BONNIE BROOK, EAST BUTLER BOROUGH, 22 BRIDGE PAINTING 90,000 23 (BASE CONSTRUCTION ALLOCATION - 24 $75,000) 25 (DESIGN AND CONTINGENCIES - $15,000) 26 (24) SR 2011, LARDINTOWN RUN BRIDGE NO.1 27 OVER LARDINTOWN RUN, CLINTON TOWNSHIP, 28 BRIDGE PAINTING 75,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $60,000) 19970H0030B0757 - 81 -
1 (DESIGN AND CONTINGENCIES - $15,000) 2 (25) SR 2011, LARDINTOWN RUN BRIDGE NO.2 3 OVER LARDINTOWN RUN, CLINTON TOWNSHIP, 4 BRIDGE PAINTING 65,000 5 (BASE CONSTRUCTION ALLOCATION - 6 $50,000) 7 (DESIGN AND CONTINGENCIES - $15,000) 8 (26) SR 2011, LARDINTOWN RUN BRIDGE NO.3 9 OVER LARDINTOWN RUN, CLINTON TOWNSHIP, 10 BRIDGE PAINTING 65,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $50,000) 13 (DESIGN AND CONTINGENCIES - $15,000) 14 (27) SR 3004, MCCALMONT BRIDGE OVER 15 CONNOQUENESSING CREEK, BUTLER TOWNSHIP, 16 BRIDGE PAINTING 105,000 17 (BASE CONSTRUCTION ALLOCATION - 18 $90,000) 19 (DESIGN AND CONTINGENCIES - $15,000) 20 (28) SR 3007, REINFREW BRIDGE OVER 21 CONNOQUENESSING CREEK, PENN TOWNSHIP, 22 BRIDGE PAINTING 115,000 23 (BASE CONSTRUCTION ALLOCATION - 24 $100,000) 25 (DESIGN AND CONTINGENCIES - $15,000) 26 (29) SR 3010, ZENO BRIDGE OVER GLADE RUN, 27 FORWARD TOWNSHIP, BRIDGE PAINTING 105,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $90,000) 30 (DESIGN AND CONTINGENCIES - $15,000) 19970H0030B0757 - 82 -
1 (30) SR 3017, KAUFMAN RUN BRIDGE OVER 2 KAUFMAN RUN, ADAMS TOWNSHIP, BRIDGE 3 PAINTING 70,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $55,000) 6 (DESIGN AND CONTINGENCIES - $15,000) 7 (31) SR 3017, BREAKNECK CREEK BRIDGE OVER 8 BREAKNECK CREEK, ADAMS TOWNSHIP, BRIDGE 9 PAINTING 105,000 10 (BASE CONSTRUCTION ALLOCATION - 11 $90,000) 12 (DESIGN AND CONTINGENCIES - $15,000) 13 (32) SR 3025, LITTLE CONNOQUENESSING CREEK 14 BRIDGE OVER LITTLE CONNOQUENESSING 15 CREEK, LANCASTER TOWNSHIP, BRIDGE 16 PAINTING 125,000 17 (BASE CONSTRUCTION ALLOCATION - 18 $110,000) 19 (DESIGN AND CONTINGENCIES - $15,000) 20 (33) SR 4006, KEISTER'S BRIDGE OVER 21 SLIPPERY ROCK CREEK, SLIPPERY ROCK 22 TOWNSHIP, BRIDGE PAINTING 105,000 23 (BASE CONSTRUCTION ALLOCATION - 24 $90,000) 25 (DESIGN AND CONTINGENCIES - $15,000) 26 (34) SR 4007, LAKE ARTHUR TRIBUTARY BRIDGE 27 OVER A TRIBUTARY OF LAKE ARTHUR, WORTH 28 TOWNSHIP, BRIDGE PAINTING 50,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $35,000) 19970H0030B0757 - 83 -
1 (DESIGN AND CONTINGENCIES - $15,000) 2 (35) SR 4007, I-79 NORTH BRIDGE NO.1 OVER 3 I-79, WORTH TOWNSHIP, BRIDGE PAINTING 245,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $230,000) 6 (DESIGN AND CONTINGENCIES - $15,000) 7 (36) SR 4007, I-79 NORTH BRIDGE NO.2 OVER 8 I-79, WORTH TOWNSHIP, BRIDGE PAINTING 215,000 9 (BASE CONSTRUCTION ALLOCATION - 10 $200,000) 11 (DESIGN AND CONTINGENCIES - $15,000) 12 (37) SR 4010, BULL VALLEY BRIDGE OVER BULL 13 VALLEY CREEK, WASHINGTON TOWNSHIP, 14 BRIDGE PAINTING 65,000 15 (BASE CONSTRUCTION ALLOCATION - 16 $50,000) 17 (DESIGN AND CONTINGENCIES - $15,000) 18 (38) SR 4012, SEATON CREEK BRIDGE OVER 19 SEATON CREEK, MARION TOWNSHIP, BRIDGE 20 PAINTING 65,000 21 (BASE CONSTRUCTION ALLOCATION - 22 $50,000) 23 (DESIGN AND CONTINGENCIES - $15,000) 24 (39) SR 8002, NORTH SHORE EXIT BRIDGE OVER 25 MUDDY CREEK, WORTH TOWNSHIP, BRIDGE 26 PAINTING 85,000 27 (BASE CONSTRUCTION ALLOCATION - 28 $70,000) 29 (DESIGN AND CONTINGENCIES - $15,000) 30 (40) SR 0422, ROUTE 422 OVERPASS, 19970H0030B0757 - 84 -
1 MUDDYCREEK TOWNSHIP, BRIDGE 2 REPLACEMENT 1,450,000 3 (BASE CONSTRUCTION ALLOCATION - 4 $1,000,000) 5 (LAND ALLOCATION - $100,000) 6 (DESIGN AND CONTINGENCIES - $350,000) 7 (41) SR 0008, B&LE RAILROAD OVERPASS, 8 MERCER TOWNSHIP, BRIDGE REPLACEMENT 1,450,000 9 (BASE CONSTRUCTION ALLOCATION - 10 $1,000,000) 11 (LAND ALLOCATION - $100,000) 12 (DESIGN AND CONTINGENCIES - $350,000) 13 (42) SR 0038, B&LE RAILROAD OVERPASS, 14 CONCORD TOWNSHIP, BRIDGE REPLACEMENT 1,050,000 15 (BASE CONSTRUCTION ALLOCATION - 16 $750,000) 17 (LAND ALLOCATION - $50,000) 18 (DESIGN AND CONTINGENCIES - $250,000) 19 (43) SR 2002, CONRAIL RAILROAD OVERPASS, 20 SUMMIT TOWNSHIP, BRIDGE REPLACEMENT 1,050,000 21 (BASE CONSTRUCTION ALLOCATION - 22 $750,000) 23 (LAND ALLOCATION - $50,000) 24 (DESIGN AND CONTINGENCIES - $250,000) 25 (44) SR 2012, B&LE RAILROAD OVERPASS, 26 JEFFERSON TOWNSHIP, BRIDGE REPLACEMENT 1,050,000 27 (BASE CONSTRUCTION ALLOCATION - 28 $750,000) 29 (LAND ALLOCATION - $50,000) 30 (DESIGN AND CONTINGENCIES - $250,000) 19970H0030B0757 - 85 -
1 (45) SR 3004, B&LE RAILROAD OVERPASS, 2 BUTLER TOWNSHIP, BRIDGE REPLACEMENT 595,000 3 (BASE CONSTRUCTION ALLOCATION - 4 $400,000) 5 (LAND ALLOCATION - $20,000) 6 (DESIGN AND CONTINGENCIES - $175,000) 7 (46) SR 0008, BRIDGE OVER ARMCO PRIVATE 8 DRIVE, BUTLER TOWNSHIP, BRIDGE 9 REPLACEMENT 1,450,000 10 (BASE CONSTRUCTION ALLOCATION - 11 $1,000,000) 12 (LAND ALLOCATION - $100,000) 13 (DESIGN AND CONTINGENCIES - $350,000) 14 (47) SR 0019, SCHOLARS RUN BRIDGE, JACKSON 15 TOWNSHIP, BRIDGE REPLACEMENT 1,050,000 16 (BASE CONSTRUCTION ALLOCATION - 17 $750,000) 18 (LAND ALLOCATION - $50,000) 19 (DESIGN AND CONTINGENCIES - $250,000) 20 (48) SR 0019, SR 0019 OVER SR 0422, 21 MUDDYCREEK TOWNSHIP, BRIDGE 22 REPLACEMENT 1,050,000 23 (BASE CONSTRUCTION ALLOCATION - 24 $750,000) 25 (LAND ALLOCATION - $50,000) 26 (DESIGN AND CONTINGENCIES - $250,000) 27 (49) SR 0058, MCMURRAY RUN BRIDGE, MARION 28 TOWNSHIP, BRIDGE REPLACEMENT 1,050,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $750,000) 19970H0030B0757 - 86 -
1 (LAND ALLOCATION - $50,000) 2 (DESIGN AND CONTINGENCIES - $250,000) 3 (50) SR 0068, SULLIVAN RUN BRIDGE, BUTLER 4 TOWNSHIP, BRIDGE REPLACEMENT 1,450,000 5 (BASE CONSTRUCTION ALLOCATION - 6 $1,000,000) 7 (LAND ALLOCATION - $100,000) 8 (DESIGN AND CONTINGENCIES - $350,000) 9 (51) SR 0080, I-80 OVER TR 540, ALLEGHENY 10 TOWNSHIP, BRIDGE REPLACEMENT 1,450,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $1,000,000) 13 (LAND ALLOCATION - $100,000) 14 (DESIGN AND CONTINGENCIES - $350,000) 15 (52) SR 0138, MUDDY CREEK BRIDGE, CLAY 16 TOWNSHIP, BRIDGE REPLACEMENT 595,000 17 (BASE CONSTRUCTION ALLOCATION - 18 $400,000) 19 (LAND ALLOCATION - $20,000) 20 (DESIGN AND CONTINGENCIES - $175,000) 21 (53) SR 0173, SLIPPERY ROCK CREEK BRIDGE, 22 SLIPPERY ROCK TOWNSHIP, BRIDGE 23 REPLACEMENT 1,050,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $750,000) 26 (LAND ALLOCATION - $50,000) 27 (DESIGN AND CONTINGENCIES - $250,000) 28 (54) SR 0079, I-79 NORTH BRIDGE OVER RAMP, 29 JACKSON TOWNSHIP, BRIDGE REPLACEMENT 1,450,000 30 (BASE CONSTRUCTION ALLOCATION - 19970H0030B0757 - 87 -
1 $1,000,000) 2 (LAND ALLOCATION - $100,000) 3 (DESIGN AND CONTINGENCIES - $350,000) 4 (55) SR 0079, I-79 SOUTH BRIDGE OVER RAMP, 5 JACKSON TOWNSHIP, BRIDGE REPLACEMENT 1,450,000 6 (BASE CONSTRUCTION ALLOCATION - 7 $1,000,000) 8 (LAND ALLOCATION - $100,000) 9 (DESIGN AND CONTINGENCIES - $350,000) 10 (56) SR 0079, I-79 OVER SR 0068, JACKSON 11 TOWNSHIP, BRIDGE REPLACEMENT 1,450,000 12 (BASE CONSTRUCTION ALLOCATION - 13 $1,000,000) 14 (LAND ALLOCATION - $100,000) 15 (DESIGN AND CONTINGENCIES - $350,000) 16 (57) SR 0079, I-79 OVER TR 347, LANCASTER 17 TOWNSHIP, BRIDGE REPLACEMENT 1,450,000 18 (BASE CONSTRUCTION ALLOCATION - 19 $1,000,000) 20 (LAND ALLOCATION - $100,000) 21 (DESIGN AND CONTINGENCIES - $350,000) 22 (58) SR 0079, I-79 NORTH BRIDGE OVER SR 23 0422, WORTH TOWNSHIP, BRIDGE 24 REPLACEMENT 1,450,000 25 (BASE CONSTRUCTION ALLOCATION - 26 $1,000,000) 27 (LAND ALLOCATION - $100,000) 28 (DESIGN AND CONTINGENCIES - $350,000) 29 (59) SR 0079, I-79 SOUTH BRIDGE OVER SR 30 0422, WORTH TOWNSHIP, BRIDGE 19970H0030B0757 - 88 -
1 REPLACEMENT 1,450,000 2 (BASE CONSTRUCTION ALLOCATION - 3 $1,000,000) 4 (LAND ALLOCATION - $100,000) 5 (DESIGN AND CONTINGENCIES - $350,000) 6 (60) SR 0422, SR 0422 OVER SR 4005, 7 MUDDYCREEK TOWNSHIP, BRIDGE 8 REPLACEMENT 1,450,000 9 (BASE CONSTRUCTION ALLOCATION - 10 $1,000,000) 11 (LAND ALLOCATION - $100,000) 12 (DESIGN AND CONTINGENCIES - $350,000) 13 (61) SR 0528, SR 0528 OVER SR 0422, 14 FRANKLIN TOWNSHIP, BRIDGE REPLACEMENT 1,050,000 15 (BASE CONSTRUCTION ALLOCATION - 16 $750,000) 17 (LAND ALLOCATION - $50,000) 18 (DESIGN AND CONTINGENCIES - $250,000) 19 (62) SR 1010, BEAR CREEK BRIDGE, FAIRVIEW 20 TOWNSHIP, BRIDGE REPLACEMENT 1,050,000 21 (BASE CONSTRUCTION ALLOCATION - 22 $750,000) 23 (LAND ALLOCATION - $50,000) 24 (DESIGN AND CONTINGENCIES - $250,000) 25 (63) SR 1014, BONNIE BROOK BRIDGE OVER 26 BONNIE BROOK, SUMMIT TOWNSHIP, BRIDGE 27 REPLACEMENT 595,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $400,000) 30 (LAND ALLOCATION - $20,000) 19970H0030B0757 - 89 -
1 (DESIGN AND CONTINGENCIES - $175,000) 2 (64) SR 1016, CONNOQUENESSING CREEK 3 BRIDGE, SUMMIT TOWNSHIP, BRIDGE 4 REPLACEMENT 595,000 5 (BASE CONSTRUCTION ALLOCATION - 6 $400,000) 7 (LAND ALLOCATION - $20,000) 8 (DESIGN AND CONTINGENCIES - $175,000) 9 (65) SR 2006, SR 2006 OVER SR 0422, SUMMIT 10 TOWNSHIP, BRIDGE REPLACEMENT 1,050,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $750,000) 13 (LAND ALLOCATION - $50,000) 14 (DESIGN AND CONTINGENCIES - $250,000) 15 (66) SR 2010, BRIDGE OVER BRANCH OF THORN 16 CREEK, JEFFERSON TOWNSHIP, BRIDGE 17 REPLACEMENT 1,050,000 18 (BASE CONSTRUCTION ALLOCATION - 19 $750,000) 20 (LAND ALLOCATION - $50,000) 21 (DESIGN AND CONTINGENCIES - $250,000) 22 (67) SR 2010, LITTLE BUFFALO CREEK BRIDGE, 23 WINFIELD TOWNSHIP, BRIDGE REPLACEMENT 1,050,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $750,000) 26 (LAND ALLOCATION - $50,000) 27 (DESIGN AND CONTINGENCIES - $250,000) 28 (68) SR 2011, BRIDGE OVER BRANCH OF BULL 29 CREEK, CLINTON TOWNSHIP, BRIDGE 30 REPLACEMENT 595,000 19970H0030B0757 - 90 -
1 (BASE CONSTRUCTION ALLOCATION - 2 $400,000) 3 (LAND ALLOCATION - $20,000) 4 (DESIGN AND CONTINGENCIES - $175,000) 5 (69) SR 2011, LITTLE BULL RUN BRIDGE NO.4 6 OVER BULL RUN, CLINTON TOWNSHIP, BRIDGE 7 REPLACEMENT 595,000 8 (BASE CONSTRUCTION ALLOCATION - 9 $400,000) 10 (LAND ALLOCATION - $20,000) 11 (DESIGN AND CONTINGENCIES - $175,000) 12 (70) SR 2018, BRIDGE NO.1 OVER BRANCH OF 13 BUFFALO CREEK, WINFIELD TOWNSHIP, 14 BRIDGE REPLACEMENT 1,050,000 15 (BASE CONSTRUCTION ALLOCATION - 16 $750,000) 17 (LAND ALLOCATION - $50,000) 18 (DESIGN AND CONTINGENCIES - $250,000) 19 (71) SR 2018, BRIDGE NO.2 OVER BRANCH OF 20 BUFFALO CREEK, WINFIELD TOWNSHIP, 21 BRIDGE REPLACEMENT 1,050,000 22 (BASE CONSTRUCTION ALLOCATION - 23 $750,000) 24 (LAND ALLOCATION - $50,000) 25 (DESIGN AND CONTINGENCIES - $250,000) 26 (72) SR 3025, LITTLE CONNOQUENESSING CREEK 27 BRIDGE, LANCASTER TOWNSHIP, BRIDGE 28 REPLACEMENT 595,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $400,000) 19970H0030B0757 - 91 -
1 (LAND ALLOCATION - $20,000) 2 (DESIGN AND CONTINGENCIES - $175,000) 3 (73) SR 4007, SR 4007 OVER SR 0422, WORTH 4 TOWNSHIP, BRIDGE REPLACEMENT 1,050,000 5 (BASE CONSTRUCTION ALLOCATION - 6 $750,000) 7 (LAND ALLOCATION - $50,000) 8 (DESIGN AND CONTINGENCIES - $250,000) 9 (74) SR 4007, PARK ROAD BRIDGE, WORTH 10 TOWNSHIP, BRIDGE REPLACEMENT 1,050,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $750,000) 13 (LAND ALLOCATION - $50,000) 14 (DESIGN AND CONTINGENCIES - $250,000) 15 (75) SR 4010, LONG RUN BRIDGE, SLIPPERY 16 ROCK TOWNSHIP, BRIDGE REPLACEMENT 595,000 17 (BASE CONSTRUCTION ALLOCATION - 18 $400,000) 19 (LAND ALLOCATION - $20,000) 20 (DESIGN AND CONTINGENCIES - $175,000) 21 (76) SR 8005, SR 8005 OVER SR 0019, 22 JACKSON TOWNSHIP, BRIDGE REPLACEMENT 595,000 23 (BASE CONSTRUCTION ALLOCATION - 24 $400,000) 25 (LAND ALLOCATION - $20,000) 26 (DESIGN AND CONTINGENCIES - $175,000) 27 (77) SR 0008, WILLIAM FLYNN BRIDGE, 28 MIDDLESEX TOWNSHIP, BRIDGE REPLACEMENT 1,450,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $1,000,000) 19970H0030B0757 - 92 -
1 (LAND ALLOCATION - $100,000) 2 (DESIGN AND CONTINGENCIES - $350,000) 3 (78) SR 0008, GLADE RUN BRIDGE, MIDDLESEX 4 TOWNSHIP, BRIDGE REHABILITATION 1,450,000 5 (BASE CONSTRUCTION ALLOCATION - 6 $1,000,000) 7 (LAND ALLOCATION - $100,000) 8 (DESIGN AND CONTINGENCIES - $350,000) 9 (79) SR 0008, LITTLE GLADE RUN BRIDGE 10 NO.1, MIDDLESEX TOWNSHIP, BRIDGE 11 REHABILITATION 1,450,000 12 (BASE CONSTRUCTION ALLOCATION - 13 $1,000,000) 14 (LAND ALLOCATION - $100,000) 15 (DESIGN AND CONTINGENCIES - $350,000) 16 (80) SR 0008, LITTLE GLADE RUN BRIDGE 17 NO.2, MIDDLESEX TOWNSHIP, BRIDGE 18 REHABILITATION 1,450,000 19 (BASE CONSTRUCTION ALLOCATION - 20 $1,000,000) 21 (LAND ALLOCATION - $100,000) 22 (DESIGN AND CONTINGENCIES - $350,000) 23 (81) SR 0008, GLADE RUN BRIDGE NO.2, 24 MIDDLESEX TOWNSHIP, BRIDGE 25 REHABILITATION 1,450,000 26 (BASE CONSTRUCTION ALLOCATION - 27 $1,000,000) 28 (LAND ALLOCATION - $100,000) 29 (DESIGN AND CONTINGENCIES - $350,000) 30 (82) SR 0008, BULCHER RUN BRIDGE, BUTLER 19970H0030B0757 - 93 -
1 TOWNSHIP, BRIDGE REHABILITATION 1,450,000 2 (BASE CONSTRUCTION ALLOCATION - 3 $1,000,000) 4 (LAND ALLOCATION - $100,000) 5 (DESIGN AND CONTINGENCIES - $350,000) 6 (83) SR 0008, BRIDGE NO.2 OVER BRANCH OF 7 MUDDY CREEK, CLAY TOWNSHIP, BRIDGE 8 REHABILITATION 1,450,000 9 (BASE CONSTRUCTION ALLOCATION - 10 $1,000,000) 11 (LAND ALLOCATION - $100,000) 12 (DESIGN AND CONTINGENCIES - $350,000) 13 (84) SR 0008, MUDDY CREEK BRIDGE, CLAY 14 TOWNSHIP, BRIDGE REHABILITATION 1,450,000 15 (BASE CONSTRUCTION ALLOCATION - 16 $1,000,000) 17 (LAND ALLOCATION - $100,000) 18 (DESIGN AND CONTINGENCIES - $350,000) 19 (85) SR 0008, GLADE RUN BRIDGE NO.3, BRADY 20 TOWNSHIP, BRIDGE REHABILITATION 1,450,000 21 (BASE CONSTRUCTION ALLOCATION - 22 $1,000,000) 23 (LAND ALLOCATION - $100,000) 24 (DESIGN AND CONTINGENCIES - $350,000) 25 (86) SR 0008, MCDONALDS RUN BRIDGE, MERCER 26 TOWNSHIP, BRIDGE REPLACEMENT 1,450,000 27 (BASE CONSTRUCTION ALLOCATION - 28 $1,000,000) 29 (LAND ALLOCATION - $100,000) 30 (DESIGN AND CONTINGENCIES - $350,000) 19970H0030B0757 - 94 -
1 (87) SR 0008, MCMURRY RUN BRIDGE, MERCER 2 TOWNSHIP, BRIDGE REHABILITATION 1,450,000 3 (BASE CONSTRUCTION ALLOCATION - 4 $1,000,000) 5 (LAND ALLOCATION - $100,000) 6 (DESIGN AND CONTINGENCIES - $350,000) 7 (88) SR 0019, GLADE RUN BRIDGE NO.2, 8 JACKSON TOWNSHIP, BRIDGE 9 REHABILITATION 1,050,000 10 (BASE CONSTRUCTION ALLOCATION - 11 $750,000) 12 (LAND ALLOCATION - $50,000) 13 (DESIGN AND CONTINGENCIES - $250,000) 14 (89) SR 0019, GLADE RUN BRIDGE NO.2, 15 JACKSON TOWNSHIP, BRIDGE 16 REHABILITATION 1,050,000 17 (BASE CONSTRUCTION ALLOCATION - 18 $750,000) 19 (LAND ALLOCATION - $50,000) 20 (DESIGN AND CONTINGENCIES - $250,000) 21 (90) SR 0038, CONNOQUENESSING CREEK 22 BRIDGE, CENTER TOWNSHIP, BRIDGE 23 REHABILITATION 1,050,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $750,000) 26 (LAND ALLOCATION - $50,000) 27 (DESIGN AND CONTINGENCIES - $250,000) 28 (91) SR 0038, PINE RUN BRIDGE, OAKLAND 29 TOWNSHIP, BRIDGE REHABILITATION 1,050,000 30 (BASE CONSTRUCTION ALLOCATION - 19970H0030B0757 - 95 -
1 $750,000) 2 (LAND ALLOCATION - $50,000) 3 (DESIGN AND CONTINGENCIES - $250,000) 4 (92) SR 0038, CONCORD BRIDGE, CONCORD 5 TOWNSHIP, BRIDGE REHABILITATION 1,050,000 6 (BASE CONSTRUCTION ALLOCATION - 7 $750,000) 8 (LAND ALLOCATION - $50,000) 9 (DESIGN AND CONTINGENCIES - $250,000) 10 (93) SR 0038, LITTLE CONNOQUENESSING CREEK 11 BRIDGE NO.1, CONCORD TOWNSHIP, BRIDGE 12 REHABILITATION 1,050,000 13 (BASE CONSTRUCTION ALLOCATION - 14 $750,000) 15 (LAND ALLOCATION - $50,000) 16 (DESIGN AND CONTINGENCIES - $250,000) 17 (94) SR 0038, LITTLE CONNOQUENESSING CREEK 18 BRIDGE, CONCORD TOWNSHIP, BRIDGE 19 REHABILITATION 1,050,000 20 (BASE CONSTRUCTION ALLOCATION - 21 $750,000) 22 (LAND ALLOCATION - $50,000) 23 (DESIGN AND CONTINGENCIES - $250,000) 24 (95) SR 0038, LITTLE SCRUBGRASS CREEK 25 BRIDGE, ALLEGHENY TOWNSHIP, BRIDGE 26 REHABILITATION 1,050,000 27 (BASE CONSTRUCTION ALLOCATION - 28 $750,000) 29 (LAND ALLOCATION - $50,000) 30 (DESIGN AND CONTINGENCIES - $250,000) 19970H0030B0757 - 96 -
1 (96) SR 0038, BRIDGE OVER TRIBUTARY OF 2 SCRUBGRASS CREEK, ALLEGHENY TOWNSHIP, 3 BRIDGE REHABILITATION 1,050,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $750,000) 6 (LAND ALLOCATION - $50,000) 7 (DESIGN AND CONTINGENCIES - $250,000) 8 (97) SR 0058, MURRIN RUN BRIDGE, VENANGO 9 TOWNSHIP, BRIDGE REHABILITATION 1,050,000 10 (BASE CONSTRUCTION ALLOCATION - 11 $750,000) 12 (LAND ALLOCATION - $50,000) 13 (DESIGN AND CONTINGENCIES - $250,000) 14 (98) SR 0068, B&LE RAILROAD BRIDGE, SUMMIT 15 AND BUTLER TOWNSHIPS, BRIDGE 16 REHABILITATION 1,450,000 17 (BASE CONSTRUCTION ALLOCATION - 18 $1,000,000) 19 (LAND ALLOCATION - $100,000) 20 (DESIGN AND CONTINGENCIES - $350,000) 21 (99) SR 0068, CONNOQUENESSING CREEK 22 BRIDGE, SUMMIT TOWNSHIP, BRIDGE 23 REHABILITATION 1,050,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $750,000) 26 (LAND ALLOCATION - $50,000) 27 (DESIGN AND CONTINGENCIES - $250,000) 28 (100) SR 0068, BUFFALO CREEK BRIDGE, 29 CHICORA TOWNSHIP, BRIDGE 30 REHABILITATION 1,050,000 19970H0030B0757 - 97 -
1 (BASE CONSTRUCTION ALLOCATION - 2 $750,000) 3 (LAND ALLOCATION - $50,000) 4 (DESIGN AND CONTINGENCIES - $250,000) 5 (101) SR 0068, BUFFALO RUN BRIDGE, 6 FAIRVIEW TOWNSHIP, BRIDGE 7 REHABILITATION 1,050,000 8 (BASE CONSTRUCTION ALLOCATION - 9 $750,000) 10 (LAND ALLOCATION - $50,000) 11 (DESIGN AND CONTINGENCIES - $250,000) 12 (102) SR 0079, BRIDGE OVER TRIBUTARY OF 13 GLADE RUN, JACKSON TOWNSHIP, BRIDGE 14 REHABILITATION 1,450,000 15 (BASE CONSTRUCTION ALLOCATION - 16 $1,000,000) 17 (LAND ALLOCATION - $100,000) 18 (DESIGN AND CONTINGENCIES - $350,000) 19 (103) SR 0079, BRIDGE NO.1 OVER BRANCH OF 20 YELLOW CREEK, LANCASTER TOWNSHIP, 21 BRIDGE REHABILITATION 1,450,000 22 (BASE CONSTRUCTION ALLOCATION - 23 $1,000,000) 24 (LAND ALLOCATION - $100,000) 25 (DESIGN AND CONTINGENCIES - $350,000) 26 (104) SR 0079, BRIDGE NO.2 OVER BRANCH OF 27 YELLOW CREEK, LANCASTER TOWNSHIP, 28 BRIDGE REHABILITATION 1,450,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $1,000,000) 19970H0030B0757 - 98 -
1 (LAND ALLOCATION - $100,000) 2 (DESIGN AND CONTINGENCIES - $350,000) 3 (105) SR 0079, BRIDGE NO.3 OVER BRANCH OF 4 YELLOW CREEK, LANCASTER TOWNSHIP, 5 BRIDGE REHABILITATION 1,450,000 6 (BASE CONSTRUCTION ALLOCATION - 7 $1,000,000) 8 (LAND ALLOCATION - $100,000) 9 (DESIGN AND CONTINGENCIES - $350,000) 10 (106) SR 0079, LITTLE YELLOW CREEK BRIDGE, 11 LANCASTER TOWNSHIP, BRIDGE 12 REHABILITATION 1,450,000 13 (BASE CONSTRUCTION ALLOCATION - 14 $1,000,000) 15 (LAND ALLOCATION - $100,000) 16 (DESIGN AND CONTINGENCIES - $350,000) 17 (107) SR 0079, BRIDGE NO.4 OVER BRANCH OF 18 YELLOW CREEK, MUDDYCREEK TOWNSHIP, 19 BRIDGE REHABILITATION 1,450,000 20 (BASE CONSTRUCTION ALLOCATION - 21 $1,000,000) 22 (LAND ALLOCATION - $100,000) 23 (DESIGN AND CONTINGENCIES - $350,000) 24 (108) SR 0079, BRIDGE AT MILEPOST 100, 25 WORTH TOWNSHIP, BRIDGE REHABILITATION 1,450,000 26 (BASE CONSTRUCTION ALLOCATION - 27 $1,000,000) 28 (LAND ALLOCATION - $100,000) 29 (DESIGN AND CONTINGENCIES - $350,000) 30 (109) SR 0079, BLACK RUN BRIDGE, WORTH 19970H0030B0757 - 99 -
1 TOWNSHIP, BRIDGE REHABILITATION 1,450,000 2 (BASE CONSTRUCTION ALLOCATION - 3 $1,000,000) 4 (LAND ALLOCATION - $100,000) 5 (DESIGN AND CONTINGENCIES - $350,000) 6 (110) SR 0268, BRIDGE OVER BRANCH OF BEAR 7 CREEK, PETROLIA BOROUGH, BRIDGE 8 REHABILITATION 1,050,000 9 (BASE CONSTRUCTION ALLOCATION - 10 $750,000) 11 (LAND ALLOCATION - $50,000) 12 (DESIGN AND CONTINGENCIES - $250,000) 13 (111) SR 0268, LOWREY RUN BRIDGE, 14 ALLEGHENY TOWNSHIP, BRIDGE 15 REHABILITATION 1,050,000 16 (BASE CONSTRUCTION ALLOCATION - 17 $750,000) 18 (LAND ALLOCATION - $50,000) 19 (DESIGN AND CONTINGENCIES - $250,000) 20 (112) SR 0308, B&LE RAILROAD BRIDGE, 21 CENTER TOWNSHIP, BRIDGE REHABILITATION 1,050,000 22 (BASE CONSTRUCTION ALLOCATION - 23 $750,000) 24 (LAND ALLOCATION - $50,000) 25 (DESIGN AND CONTINGENCIES - $250,000) 26 (113) SR 0308, STONY RUN BRIDGE, CENTER 27 TOWNSHIP, BRIDGE REHABILITATION 1,050,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $750,000) 30 (LAND ALLOCATION - $50,000) 19970H0030B0757 - 100 -
1 (DESIGN AND CONTINGENCIES - $250,000) 2 (114) SR 0356, LITTLE BUFFALO CREEK 3 BRIDGE, BUFFALO TOWNSHIP, BRIDGE 4 REHABILITATION 1,050,000 5 (BASE CONSTRUCTION ALLOCATION - 6 $750,000) 7 (LAND ALLOCATION - $50,000) 8 (DESIGN AND CONTINGENCIES - $250,000) 9 (115) SR 0356, BIG COAL RUN BRIDGE, SUMMIT 10 TOWNSHIP, BRIDGE REHABILITATION 1,050,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $750,000) 13 (LAND ALLOCATION - $50,000) 14 (DESIGN AND CONTINGENCIES - $250,000) 15 (116) SR 0422, LAKE ARTHUR BRIDGE, 16 FRANKLIN TOWNSHIP, BRIDGE 17 REHABILITATION 1,450,000 18 (BASE CONSTRUCTION ALLOCATION - 19 $1,000,000) 20 (LAND ALLOCATION - $100,000) 21 (DESIGN AND CONTINGENCIES - $350,000) 22 (117) SR 0422, BIG RUN BRIDGE, FRANKLIN 23 TOWNSHIP, BRIDGE REHABILITATION 1,450,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $1,000,000) 26 (LAND ALLOCATION - $100,000) 27 (DESIGN AND CONTINGENCIES - $350,000) 28 (118) SR 0422, MULLIGAN RUN BRIDGE, 29 FRANKLIN TOWNSHIP, BRIDGE 30 REHABILITATION 1,450,000 19970H0030B0757 - 101 -
1 (BASE CONSTRUCTION ALLOCATION - 2 $1,000,000) 3 (LAND ALLOCATION - $100,000) 4 (DESIGN AND CONTINGENCIES - $350,000) 5 (119) SR 0422, BIG MULLIGAN RUN BRIDGE, 6 FRANKLIN TOWNSHIP, BRIDGE 7 REHABILITATION 1,450,000 8 (BASE CONSTRUCTION ALLOCATION - 9 $1,000,000) 10 (LAND ALLOCATION - $100,000) 11 (DESIGN AND CONTINGENCIES - $350,000) 12 (120) SR 0422, BIG SULLIVAN RUN BRIDGE, 13 BUTLER TOWNSHIP, BRIDGE REHABILITATION 1,450,000 14 (BASE CONSTRUCTION ALLOCATION - 15 $1,000,000) 16 (LAND ALLOCATION - $100,000) 17 (DESIGN AND CONTINGENCIES - $350,000) 18 (121) SR 0422, CONNOQUENESSING CREEK 19 BRIDGE, BUTLER TOWNSHIP, BRIDGE 20 REHABILITATION 1,450,000 21 (BASE CONSTRUCTION ALLOCATION - 22 $1,000,000) 23 (LAND ALLOCATION - $100,000) 24 (DESIGN AND CONTINGENCIES - $350,000) 25 (122) SR 0422, BRIDGE NO.1 OVER TRIBUTARY 26 OF CONNOQUENESSING CREEK, SUMMIT 27 TOWNSHIP, BRIDGE REHABILITATION 1,450,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $1,000,000) 30 (LAND ALLOCATION - $100,000) 19970H0030B0757 - 102 -
1 (DESIGN AND CONTINGENCIES - $350,000) 2 (123) SR 0422, BRIDGE NO.2 OVER TRIBUTARY 3 OF BONNIE BROOK, BUTLER TOWNSHIP, 4 BRIDGE REHABILITATION 1,450,000 5 (BASE CONSTRUCTION ALLOCATION - 6 $1,000,000) 7 (LAND ALLOCATION - $100,000) 8 (DESIGN AND CONTINGENCIES - $350,000) 9 (124) SR 0422, BONNIE BROOK BRIDGE NO.1, 10 SUMMIT TOWNSHIP, BRIDGE REHABILITATION 1,450,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $1,000,000) 13 (LAND ALLOCATION - $100,000) 14 (DESIGN AND CONTINGENCIES - $350,000) 15 (125) SR 0422, BRIDGE NO.3 OVER TRIBUTARY 16 OF BONNIE BROOK, SUMMIT TOWNSHIP, 17 BRIDGE REHABILITATION 1,450,000 18 (BASE CONSTRUCTION ALLOCATION - 19 $1,000,000) 20 (LAND ALLOCATION - $100,000) 21 (DESIGN AND CONTINGENCIES - $350,000) 22 (126) SR 0422, BONNIE BROOK BRIDGE NO.2, 23 SUMMIT TOWNSHIP, BRIDGE REHABILITATION 1,450,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $1,000,000) 26 (LAND ALLOCATION - $100,000) 27 (DESIGN AND CONTINGENCIES - $350,000) 28 (127) SR 0422, BRIDGE NO.4 OVER TRIBUTARY 29 OF BONNIE BROOK, SUMMIT TOWNSHIP, 30 BRIDGE REHABILITATION 1,450,000 19970H0030B0757 - 103 -
1 (BASE CONSTRUCTION ALLOCATION - 2 $1,000,000) 3 (LAND ALLOCATION - $100,000) 4 (DESIGN AND CONTINGENCIES - $350,000) 5 (128) SR 0422, LITTLE BUFFALO CREEK 6 BRIDGE, CLEARFIELD TOWNSHIP, BRIDGE 7 REHABILITATION 1,450,000 8 (BASE CONSTRUCTION ALLOCATION - 9 $1,000,000) 10 (LAND ALLOCATION - $100,000) 11 (DESIGN AND CONTINGENCIES - $350,000) 12 (129) SR 0422, BUFFALO CREEK BRIDGE, 13 CLEARFIELD TOWNSHIP, BRIDGE 14 REHABILITATION 1,450,000 15 (BASE CONSTRUCTION ALLOCATION - 16 $1,000,000) 17 (LAND ALLOCATION - $100,000) 18 (DESIGN AND CONTINGENCIES - $350,000) 19 (130) SR 0528, LIKENS RUN BRIDGE, EVANS 20 CITY BOROUGH, BRIDGE REHABILITATION 1,050,000 21 (BASE CONSTRUCTION ALLOCATION - 22 $750,000) 23 (LAND ALLOCATION - $50,000) 24 (DESIGN AND CONTINGENCIES - $250,000) 25 (131) SR 1010, GLADE RUN BRIDGE, BRADY 26 TOWNSHIP, BRIDGE REHABILITATION 595,000 27 (BASE CONSTRUCTION ALLOCATION - 28 $400,000) 29 (LAND ALLOCATION - $20,000) 30 (DESIGN AND CONTINGENCIES - $175,000) 19970H0030B0757 - 104 -
1 (132) SR 1010, BIG BEAR CREEK BRIDGE, 2 FAIRVIEW TOWNSHIP, BRIDGE 3 REHABILITATION 595,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $400,000) 6 (LAND ALLOCATION - $20,000) 7 (DESIGN AND CONTINGENCIES - $175,000) 8 (133) SR 1011, BUFFALO CREEK BRIDGE, 9 FAIRVIEW TOWNSHIP, BRIDGE 10 REHABILITATION 595,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $400,000) 13 (LAND ALLOCATION - $20,000) 14 (DESIGN AND CONTINGENCIES - $175,000) 15 (134) SR 1019, BIG BUFFALO RUN BRIDGE, 16 DONEGAL TOWNSHIP, BRIDGE 17 REHABILITATION 1,050,000 18 (BASE CONSTRUCTION ALLOCATION - 19 $750,000) 20 (LAND ALLOCATION - $50,000) 21 (DESIGN AND CONTINGENCIES - $250,000) 22 (135) SR 1025, BONNIE BROOK BRIDGE, SUMMIT 23 TOWNSHIP, BRIDGE REHABILITATION 1,050,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $750,000) 26 (LAND ALLOCATION - $50,000) 27 (DESIGN AND CONTINGENCIES - $250,000) 28 (136) SR 2002, COAL RUN BRIDGE, CITY OF 29 BUTLER AND BUTLER TOWNSHIP, BRIDGE 30 REHABILITATION 1,050,000 19970H0030B0757 - 105 -
1 (BASE CONSTRUCTION ALLOCATION - 2 $750,000) 3 (LAND ALLOCATION - $50,000) 4 (DESIGN AND CONTINGENCIES - $250,000) 5 (137) SR 2004, BONNIE BROOK BRIDGE, SUMMIT 6 TOWNSHIP, BRIDGE REHABILITATION 1,050,000 7 (BASE CONSTRUCTION ALLOCATION - 8 $750,000) 9 (LAND ALLOCATION - $50,000) 10 (DESIGN AND CONTINGENCIES - $250,000) 11 (138) SR 2012, THORN CREEK BRIDGE NO.1, 12 JEFFERSON TOWNSHIP, BRIDGE 13 REHABILITATION 1,050,000 14 (BASE CONSTRUCTION ALLOCATION - 15 $750,000) 16 (LAND ALLOCATION - $50,000) 17 (DESIGN AND CONTINGENCIES - $250,000) 18 (139) SR 2012, THORN CREEK BRIDGE NO.2, 19 JEFFERSON TOWNSHIP, BRIDGE 20 REHABILITATION 1,050,000 21 (BASE CONSTRUCTION ALLOCATION - 22 $750,000) 23 (LAND ALLOCATION - $50,000) 24 (DESIGN AND CONTINGENCIES - $250,000) 25 (140) SR 3001, WEST BUTLER CREEK BRIDGE, 26 BUTLER TOWNSHIP, BRIDGE REHABILITATION 1,450,000 27 (BASE CONSTRUCTION ALLOCATION - 28 $1,000,000) 29 (LAND ALLOCATION - $100,000) 30 (DESIGN AND CONTINGENCIES - $350,000) 19970H0030B0757 - 106 -
1 (141) SR 3007, THORN CREEK BRIDGE, BUTLER 2 TOWNSHIP, BRIDGE REHABILITATION 1,050,000 3 (BASE CONSTRUCTION ALLOCATION - 4 $750,000) 5 (LAND ALLOCATION - $50,000) 6 (DESIGN AND CONTINGENCIES - $250,000) 7 (142) SR 3009, CRANBERRY RUN BRIDGE, PENN 8 TOWNSHIP, BRIDGE REHABILITATION 595,000 9 (BASE CONSTRUCTION ALLOCATION - 10 $400,000) 11 (LAND ALLOCATION - $20,000) 12 (DESIGN AND CONTINGENCIES - $175,000) 13 (143) SR 3010, SAW MILL RUN BRIDGE, PENN 14 TOWNSHIP, BRIDGE REHABILITATION 595,000 15 (BASE CONSTRUCTION ALLOCATION - 16 $400,000) 17 (LAND ALLOCATION - $20,000) 18 (DESIGN AND CONTINGENCIES - $175,000) 19 (144) SR 3015, BRIDGE NO.2 OVER TRIBUTARY 20 OF WOLF RUN, FORWARD TOWNSHIP, BRIDGE 21 REHABILITATION 1,050,000 22 (BASE CONSTRUCTION ALLOCATION - 23 $750,000) 24 (LAND ALLOCATION - $50,000) 25 (DESIGN AND CONTINGENCIES - $250,000) 26 (145) SR 3015, BRIDGE NO.3 OVER TRIBUTARY 27 OF WOLF RUN, FORWARD TOWNSHIP, BRIDGE 28 REHABILITATION 1,050,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $750,000) 19970H0030B0757 - 107 -
1 (LAND ALLOCATION - $50,000) 2 (DESIGN AND CONTINGENCIES - $250,000) 3 (146) SR 3025, BRIDGE OVER BRANCH OF 4 YELLOW CREEK, LANCASTER TOWNSHIP, 5 BRIDGE REHABILITATION 595,000 6 (BASE CONSTRUCTION ALLOCATION - 7 $400,000) 8 (LAND ALLOCATION - $20,000) 9 (DESIGN AND CONTINGENCIES - $175,000) 10 (147) SR 3031, SR 3031 OVER US 422, BUTLER 11 TOWNSHIP, BRIDGE REHABILITATION 595,000 12 (BASE CONSTRUCTION ALLOCATION - 13 $400,000) 14 (LAND ALLOCATION - $20,000) 15 (DESIGN AND CONTINGENCIES - $175,000) 16 (148) SR 3034, BRIDGE OVER BRANCH OF 17 SEMICONON, PROSPECT BOROUGH, BRIDGE 18 REHABILITATION 595,000 19 (BASE CONSTRUCTION ALLOCATION - 20 $400,000) 21 (LAND ALLOCATION - $20,000) 22 (DESIGN AND CONTINGENCIES - $175,000) 23 (149) SR 4001, SR 4001 OVER US 422, BUTLER 24 TOWNSHIP, BRIDGE REHABILITATION 1,050,000 25 (BASE CONSTRUCTION ALLOCATION - 26 $750,000) 27 (LAND ALLOCATION - $50,000) 28 (DESIGN AND CONTINGENCIES - $250,000) 29 (150) SR 4002, BRIDGE OVER BRANCH OF MUDDY 30 CREEK, CLAY TOWNSHIP, BRIDGE 19970H0030B0757 - 108 -
1 REHABILITATION 1,050,000 2 (BASE CONSTRUCTION ALLOCATION - 3 $750,000) 4 (LAND ALLOCATION - $50,000) 5 (DESIGN AND CONTINGENCIES - $250,000) 6 (151) T-716, OLD PLANK ROAD BRIDGE, PENN 7 TOWNSHIP, BRIDGE REPLACEMENT 390,000 8 (BASE CONSTRUCTION ALLOCATION - 9 $300,000) 10 (LAND ALLOCATION - $10,000) 11 (DESIGN AND CONTINGENCIES - $80,000) 12 (152) SR 3007, CROOKED RUN BRIDGE, CENTER 13 TOWNSHIP, BRIDGE REPLACEMENT 1,050,000 14 (BASE CONSTRUCTION ALLOCATION - 15 $750,000) 16 (LAND ALLOCATION - $50,000) 17 (DESIGN AND CONTINGENCIES - $250,000) 18 (153) SR 3010, GLADE RUN BRIDGE, FORWARD 19 TOWNSHIP, BRIDGE REPLACEMENT 595,000 20 (BASE CONSTRUCTION ALLOCATION - 21 $400,000) 22 (LAND ALLOCATION - $20,000) 23 (DESIGN AND CONTINGENCIES - $175,000) 24 (154) SR 3013, BIG CONNOQUESSING BRIDGE, 25 FORWARD TOWNSHIP, BRIDGE REPLACEMENT 595,000 26 (BASE CONSTRUCTION ALLOCATION - 27 $400,000) 28 (LAND ALLOCATION - $20,000) 29 (DESIGN AND CONTINGENCIES - $175,000) 30 (155) SR 0019, SR 0019 OVER BRUSH CREEK, 19970H0030B0757 - 109 -
1 CRANBERRY TOWNSHIP, BRIDGE REPLACEMENT 1,050,000 2 (BASE CONSTRUCTION ALLOCATION - 3 $800,000) 4 (LAND ALLOCATION - $75,000) 5 (DESIGN AND CONTINGENCIES - $175,000) 6 (156) SR 0079, SR 0079 OVER BIG BRUSH 7 CREEK, CRANBERRY TOWNSHIP, BRIDGE 8 REPLACEMENT 1,450,000 9 (BASE CONSTRUCTION ALLOCATION - 10 $1,100,000) 11 (LAND ALLOCATION - $75,000) 12 (DESIGN AND CONTINGENCIES - $275,000) 13 (157) SR 0079, SR 0079 OVER COAL RUN, 14 CRANBERRY TOWNSHIP, BRIDGE REPLACEMENT 1,450,000 15 (BASE CONSTRUCTION ALLOCATION - 16 $1,100,000) 17 (LAND ALLOCATION - $75,000) 18 (DESIGN AND CONTINGENCIES - $275,000) 19 (158) SR 0228, SR 0228 OVER CSX RAILROAD, 20 ADAMS TOWNSHIP, BRIDGE REPLACEMENT 1,450,000 21 (BASE CONSTRUCTION ALLOCATION - 22 $1,100,000) 23 (LAND ALLOCATION - $75,000) 24 (DESIGN AND CONTINGENCIES - $275,000) 25 (159) SR 3015, BREAKNECK BRIDGE, ADAMS 26 TOWNSHIP, BRIDGE REPLACEMENT 595,000 27 (BASE CONSTRUCTION ALLOCATION - 28 $400,000) 29 (LAND ALLOCATION - $20,000) 30 (DESIGN AND CONTINGENCIES - $175,000) 19970H0030B0757 - 110 -
1 (160) SR 3022, SR 3022 OVER BRUSH CREEK, 2 CRANBERRY TOWNSHIP, BRIDGE REPLACEMENT 1,050,000 3 (BASE CONSTRUCTION ALLOCATION - 4 $800,000) 5 (LAND ALLOCATION - $75,000) 6 (DESIGN AND CONTINGENCIES - $175,000) 7 (161) SR 3024, SR 3024 OVER BIG BRUSH 8 CREEK, CRANBERRY TOWNSHIP, BRIDGE 9 REPLACEMENT 595,000 10 (BASE CONSTRUCTION ALLOCATION - 11 $400,000) 12 (LAND ALLOCATION - $20,000) 13 (DESIGN AND CONTINGENCIES - $175,000) 14 SECTION 15. CAMBRIA COUNTY 15 (A) LOCAL BRIDGES 16 (1) SUMMERHILL TOWNSHIP, T-346, BRIDGE 17 NO.1, HOWARD AVENUE OVER BEAVERDAM RUN, 18 BRIDGE REPLACEMENT 450,000 19 (BASE CONSTRUCTION ALLOCATION - 20 $350,000) 21 (DESIGN AND CONTINGENCIES - $100,000) 22 (2) WEST CARROLL TOWNSHIP, T-505 OVER 23 BLACKLICK CREEK, BRIDGE REPLACEMENT 235,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $200,000) 26 (LAND ALLOCATION - $10,000) 27 (DESIGN AND CONTINGENCIES - $25,000) 28 (3) WEST CARROLL TOWNSHIP, T-626 OVER FOX 29 RUN, BRIDGE REPLACEMENT 235,000 30 (BASE CONSTRUCTION ALLOCATION - 19970H0030B0757 - 111 -
1 $200,000) 2 (LAND ALLOCATION - $10,000) 3 (DESIGN AND CONTINGENCIES - $25,000) 4 (B) STATE BRIDGES 5 (1) SR 1030, CARL ROAD OVER SLATE LICK 6 CREEK, CLEARFIELD TOWNSHIP, BRIDGE 7 REPLACEMENT 240,000 8 (BASE CONSTRUCTION ALLOCATION - 9 $200,000) 10 (LAND ALLOCATION - $10,000) 11 (DESIGN AND CONTINGENCIES - $30,000) 12 (2) SR 0271, MAPLE AVENUE BRIDGE OVER 13 LITTLE CONEMAUGH RIVER AND CONRAIL, 14 PHASE II, CITY OF JOHNSTOWN, BRIDGE 15 PAINTING 500,000 16 (BASE CONSTRUCTION ALLOCATION - 17 $500,000) 18 (3) SR 3033, PA 56 DETOUR BRIDGE OVER 19 SOLOMON RUN, RICHLAND TOWNSHIP, BRIDGE 20 REPLACEMENT 350,000 21 (BASE CONSTRUCTION ALLOCATION - 22 $250,000) 23 (LAND ALLOCATION - $15,000) 24 (DESIGN AND CONTINGENCIES - $85,000) 25 SECTION 16. CAMERON COUNTY (RESERVED). 26 SECTION 17. CARBON COUNTY. 27 (A) LOCAL BRIDGES 28 (1) PENN FOREST TOWNSHIP, T-481, COUNTY 29 BRIDGE NO.21 OVER PANTHER CREEK, BRIDGE 30 REPLACEMENT 290,000 19970H0030B0757 - 112 -
1 (BASE CONSTRUCTION ALLOCATION - 2 $180,000) 3 (LAND ALLOCATION - $10,000) 4 (DESIGN AND CONTINGENCIES - $100,000) 5 (B) STATE BRIDGES 6 (1) SR 2002, DELAWARE AVENUE OVER PALMER 7 CREEK, PALMERTON BOROUGH, BRIDGE 8 REPLACEMENT 568,000 9 (BASE CONSTRUCTION ALLOCATION - 10 $318,000) 11 (LAND ALLOCATION - $150,000) 12 (DESIGN AND CONTINGENCIES - $100,000) 13 (2) SR 4010, SR 4010 OVER QUAKAKE CREEK, 14 PACKER TOWNSHIP, BRIDGE REPLACEMENT 412,000 15 (BASE CONSTRUCTION ALLOCATION - 16 $202,000) 17 (LAND ALLOCATION - $150,000) 18 (DESIGN AND CONTINGENCIES - $60,000) 19 (3) SR 0209, SR 0209 TURNPIKE RAMP, 20 MAHONING INTERCHANGE, FRANKLIN 21 TOWNSHIP, BRIDGE REPLACEMENT 1,260,000 22 (BASE CONSTRUCTION ALLOCATION - 23 $750,000) 24 (LAND ALLOCATION - $300,000) 25 (DESIGN AND CONTINGENCIES - $210,000) 26 (4) SR 0248, SR 0248 OVER POHOPOCO CREEK, 27 PARRYVILLE BOROUGH LINE, LOWER 28 TOWAMENSING TOWNSHIP, BRIDGE 29 REHABILITATION 415,000 30 (BASE CONSTRUCTION ALLOCATION - 19970H0030B0757 - 113 -
1 $315,000) 2 (DESIGN AND CONTINGENCIES - $100,000) 3 (5) SR 4010, SR 4010 OVER HARTZ CREEK, 4 PACKER TOWNSHIP, BRIDGE REPLACEMENT 615,000 5 (BASE CONSTRUCTION ALLOCATION - 6 $370,000) 7 (LAND ALLOCATION - $150,000) 8 (DESIGN AND CONTINGENCIES - $95,000) 9 (6) SR 0534, SR 0534 OVER SAND SPRING RUN, 10 2 MILES SOUTH OF LEHIGH TANNERY, KIDDER 11 TOWNSHIP, BRIDGE REPLACEMENT 340,000 12 (BASE CONSTRUCTION ALLOCATION - 13 $160,000) 14 (LAND ALLOCATION - $125,000) 15 (DESIGN AND CONTINGENCIES - $55,000) 16 (7) SR 0209, SR 0209 OVER POHOPOCO CREEK, 17 VILLAGE OF HARRITY, FRANKLIN TOWNSHIP, 18 BRIDGE REHABILITATION 885,000 19 (BASE CONSTRUCTION ALLOCATION - 20 $680,000) 21 (DESIGN AND CONTINGENCIES - $205,000) 22 (8) SR 0534, PA 534 OVER I-80, KIDDER 23 TOWNSHIP, BRIDGE REHABILITATION 540,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $440,000) 26 (DESIGN AND CONTINGENCIES - $100,000) 27 SECTION 18. CENTRE COUNTY. 28 (A) LOCAL BRIDGES 29 (1) GREENE TOWNSHIP, T-350, STOVER ROAD 30 BRIDGE, BRIDGE REPLACEMENT 230,000 19970H0030B0757 - 114 -
1 (BASE CONSTRUCTION ALLOCATION - 2 $180,000) 3 (LAND ALLOCATION - $10,000) 4 (DESIGN AND CONTINGENCIES - $40,000) 5 (2) HOWARD TOWNSHIP, T-398 OVER BULLIT 6 RUN, BRIDGE REHABILITATION 11,000 7 (BASE CONSTRUCTION ALLOCATION - $9,000) 8 (DESIGN AND CONTINGENCIES - $2,000) 9 (3) HALFMOON TOWNSHIP, T-307 OVER 10 LOVEVILLE CREEK, BRIDGE REPLACEMENT 21,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $19,000) 13 (DESIGN AND CONTINGENCIES - $2,000) 14 (4) PENN TOWNSHIP, T-839 OVER PINE CREEK, 15 BRIDGE REHABILITATION 80,000 16 (BASE CONSTRUCTION ALLOCATION - 17 $60,000) 18 (DESIGN AND CONTINGENCIES - $20,000) 19 (5) PORT MATILDA BOROUGH, PEDESTRIAN 20 BRIDGE OVER BALD EAGLE CREEK, BRIDGE 21 REHABILITATION 200,000 22 (BASE CONSTRUCTION ALLOCATION - 23 $175,000) 24 (DESIGN AND CONTINGENCIES - $25,000) 25 (6) SPRING TOWNSHIP, T-367, HILL ROAD 26 BRIDGE, BRIDGE REPLACEMENT 200,000 27 (BASE CONSTRUCTION ALLOCATION - 28 $150,000) 29 (LAND ALLOCATION - $10,000) 30 (DESIGN AND CONTINGENCIES - $40,000) 19970H0030B0757 - 115 -
1 (B) STATE BRIDGES 2 (1) SR 0080, I-80 VIADUCT OVER MOSHANNON 3 CREEK AND CONRAIL, RUSH TOWNSHIP, 4 BRIDGE REHABILITATION 14,510,000 5 (BASE CONSTRUCTION ALLOCATION - 6 $13,210,000) 7 (DESIGN AND CONTINGENCIES - $1,300,000) 8 (2) SR 1002, MARSH CREEK BRIDGE OVER MARSH 9 CREEK, BOGGS TOWNSHIP, BRIDGE 10 REPLACEMENT 760,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $630,000) 13 (LAND ALLOCATION - $20,000) 14 (DESIGN AND CONTINGENCIES - $110,000) 15 (3) SR 1002, LITTLE MARSH CREEK BRIDGE 16 OVER LITTLE MARSH CREEK, CURTIN 17 TOWNSHIP, BRIDGE REPLACEMENT 700,000 18 (BASE CONSTRUCTION ALLOCATION - 19 $600,000) 20 (LAND ALLOCATION - $20,000) 21 (DESIGN AND CONTINGENCIES - $80,000) 22 (4) SR 2012, PENNS CREEK BRIDGE NORTHWEST 23 OF THE VILLAGE OF SPRING MILLS, GREGG 24 TOWNSHIP, BRIDGE REPLACEMENT 470,000 25 (BASE CONSTRUCTION ALLOCATION - 26 $360,000) 27 (LAND ALLOCATION - $20,000) 28 (DESIGN AND CONTINGENCIES - $90,000) 29 (5) SR 0220, SR 0220 OVER LAUREL RUN, PORT 30 MATILDA BOROUGH, BRIDGE REHABILITATION 450,000 19970H0030B0757 - 116 -
1 (BASE CONSTRUCTION ALLOCATION - 2 $400,000) 3 (DESIGN AND CONTINGENCIES - $50,000) 4 SECTION 19. CHESTER COUNTY. 5 (A) LOCAL BRIDGES 6 (1) PARKESBURG BOROUGH, STATE STREET 7 PEDESTRIAN BRIDGE OVER AMTRAK, BRIDGE 8 REPLACEMENT 1,700,000 9 (BASE CONSTRUCTION ALLOCATION - 10 $1,000,000) 11 (LAND ALLOCATION - $500,000) 12 (DESIGN AND CONTINGENCIES - $200,000) 13 (2) EAST FALLOWFIELD TOWNSHIP, T-362, 14 TIMACUIA ROAD UNDER PENN CENTRAL 15 RAILROAD, BRIDGE REMOVAL 445,000 16 (BASE CONSTRUCTION ALLOCATION - 17 $400,000) 18 (LAND ALLOCATION - $30,000) 19 (DESIGN AND CONTINGENCIES - $15,000) 20 (3) EAST MARLBOROUGH TOWNSHIP, T-402, 21 COUNTY BRIDGE NO.65, MILL ROAD BRIDGE 22 OVER WEST BRANCH OF RED CLAY CREEK, 23 BRIDGE REPLACEMENT 345,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $291,000) 26 (LAND ALLOCATION - $25,000) 27 (DESIGN AND CONTINGENCIES - $29,000) 28 (4) OXFORD BOROUGH, BROAD STREET BRIDGE 29 OVER SEPTA, BRIDGE REPLACEMENT 1,304,000 30 (BASE CONSTRUCTION ALLOCATION - 19970H0030B0757 - 117 -
1 $1,125,000) 2 (LAND ALLOCATION - $20,000) 3 (DESIGN AND CONTINGENCIES - $159,000) 4 (5) PENN TOWNSHIP, COUNTY BRIDGE NO.260, 5 POSEY MILL ROAD BRIDGE OVER BIG ELK 6 CREEK, BRIDGE REPLACEMENT 425,000 7 (BASE CONSTRUCTION ALLOCATION - 8 $300,000) 9 (LAND ALLOCATION - $25,000) 10 (DESIGN AND CONTINGENCIES - $100,000) 11 (6) TREDYFFRIN TOWNSHIP, OLD LANCASTER 12 PIKE BRIDGE OVER AMTRAK, BRIDGE 13 REHABILITATION 465,000 14 (BASE CONSTRUCTION ALLOCATION - 15 $400,000) 16 (LAND ALLOCATION - $30,000) 17 (DESIGN AND CONTINGENCIES - $35,000) 18 (7) TREDYFFRIN TOWNSHIP, T-807, EVANS ROAD 19 BRIDGE OVER CONRAIL, BRIDGE 20 REPLACEMENT 195,000 21 (BASE CONSTRUCTION ALLOCATION - 22 $150,000) 23 (LAND ALLOCATION - $30,000) 24 (DESIGN AND CONTINGENCIES - $15,000) 25 (8) WEST CALN AND WEST BRANDYWINE 26 TOWNSHIPS, COUNTY BRIDGE NO.283, REID 27 ROAD BRIDGE OVER WEST BRANCH OF 28 BRANDYWINE CREEK, BRIDGE REPLACEMENT 740,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $600,000) 19970H0030B0757 - 118 -
1 (LAND ALLOCATION - $40,000) 2 (DESIGN AND CONTINGENCIES - $100,000) 3 (9) WEST GOSHEN TOWNSHIP, T-210, OLD 4 EACHUS MILL ROAD BRIDGE OVER SEPTA, 5 BRIDGE REPLACEMENT 615,000 6 (BASE CONSTRUCTION ALLOCATION - 7 $500,000) 8 (LAND ALLOCATION - $15,000) 9 (DESIGN AND CONTINGENCIES - $100,000) 10 (10) WEST GOSHEN TOWNSHIP, T-328, BRIDGE 11 OVER PENN CENTRAL RAILROAD, BRIDGE 12 REMOVAL 132,000 13 (BASE CONSTRUCTION ALLOCATION - 14 $110,000) 15 (LAND ALLOCATION - $5,000) 16 (DESIGN AND CONTINGENCIES - $17,000) 17 (11) WEST MARLBOROUGH TOWNSHIP, T-368, 18 CREEK ROAD BRIDGE UNDER PENN CENTRAL 19 RAILROAD, BRIDGE REMOVAL 580,000 20 (BASE CONSTRUCTION ALLOCATION - 21 $500,000) 22 (LAND ALLOCATION - $5,000) 23 (DESIGN AND CONTINGENCIES - $75,000) 24 (12) WEST MARLBOROUGH TOWNSHIP, BRIDGE 25 OVER DOE RUN, BRIDGE REPLACEMENT 915,000 26 (BASE CONSTRUCTION ALLOCATION - 27 $750,000) 28 (LAND ALLOCATION - $25,000) 29 (DESIGN AND CONTINGENCIES - $140,000) 30 (13) EAST COVENTRY TOWNSHIP, ZEIBER ROAD 19970H0030B0757 - 119 -
1 OVER PIGEON CREEK, BRIDGE REPLACEMENT 375,000 2 (BASE CONSTRUCTION ALLOCATION - 3 $300,000) 4 (LAND ALLOCATION - $15,000) 5 (DESIGN AND CONTINGENCIES - $60,000) 6 (14) SOUTH COVENTRY TOWNSHIP, YOUNG ROAD 7 OVER PIGEON CREEK, BRIDGE 8 REHABILITATION 6,000 9 (BASE CONSTRUCTION ALLOCATION - $6,000) 10 (15) FRANKLIN TOWNSHIP, T-356, MOUNT 11 OLIVET ROAD BRIDGE OVER UNNAMED 12 TRIBUTARY OF BIG ELK CREEK, BRIDGE 13 REHABILITATION 8,100,000 14 (BASE CONSTRUCTION ALLOCATION - 15 $6,600,000) 16 (DESIGN AND CONTINGENCIES - $1,500,000) 17 (16) NORTH COVENTRY TOWNSHIP, SOUTH KEIM 18 STREET, BRIDGE NO.270 OVER SMALL RUN, 19 BRIDGE REPLACEMENT 510,000 20 (BASE CONSTRUCTION ALLOCATION - 21 $150,000) 22 (LAND ALLOCATION - $10,000) 23 (DESIGN AND CONTINGENCIES - $350,000) 24 (B) STATE BRIDGES 25 (1) SR 1010, SWEDESFORD ROAD BRIDGE OVER 26 US 422, DRUMMERS LANE AND WARNER ROAD, 27 TREDYFFRIN, CHESTER COUNTY, UPPER 28 MERION, MONTGOMERY COUNTY, BRIDGE 29 REPLACEMENT 6,795,000 30 (BASE CONSTRUCTION ALLOCATION - 19970H0030B0757 - 120 -
1 $6,210,000) 2 (LAND ALLOCATION - $180,000) 3 (DESIGN AND CONTINGENCIES - $405,000) 4 (2) SR 1045, HARES HILL ROAD BRIDGE OVER 5 FRENCH CREEK, EAST PIKELAND TOWNSHIP, 6 BRIDGE REHABILITATION 1,000,000 7 (BASE CONSTRUCTION ALLOCATION - 8 $740,000) 9 (LAND ALLOCATION - $60,000) 10 (DESIGN AND CONTINGENCIES - $200,000) 11 (3) SR 3014, LEES ROAD BRIDGE OVER BLACK 12 RUN, WEST NOTTINGHAM TOWNSHIP, BRIDGE 13 REPLACEMENT 1,125,000 14 (BASE CONSTRUCTION ALLOCATION - 15 $850,000) 16 (LAND ALLOCATION - $75,000) 17 (DESIGN AND CONTINGENCIES - $200,000) 18 (4) SR 3030, STREET ROAD BRIDGE OVER 19 OCTORARO CREEK, UPPER OXFORD TOWNSHIP, 20 BRIDGE REPLACEMENT 1,875,000 21 (BASE CONSTRUCTION ALLOCATION - 22 $1,600,000) 23 (LAND ALLOCATION - $75,000) 24 (DESIGN AND CONTINGENCIES - $200,000) 25 (5) SR 0003, GAY STREET BRIDGE OVER 26 ABANDONED CONRAIL, WEST CHESTER 27 BOROUGH, BRIDGE REMOVAL 180,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $150,000) 30 (LAND ALLOCATION - $10,000) 19970H0030B0757 - 121 -
1 (DESIGN AND CONTINGENCIES - $20,000) 2 (6) SR 0842, SHAWS BRIDGES (TWO BRIDGES) 3 OVER BRANCH OF BRANDYWINE CREEK, EAST 4 BRADFORD AND POCOPSON TOWNSHIPS, BRIDGE 5 REPLACEMENT 1,500,000 6 (BASE CONSTRUCTION ALLOCATION - 7 $1,288,000) 8 (LAND ALLOCATION - $100,000) 9 (DESIGN AND CONTINGENCIES - $112,000) 10 (7) SR 0842, BRIDGE ROAD BRIDGE OVER EAST 11 BRANCH OF BRANDYWINE CREEK, EAST 12 BRADFORD TOWNSHIP, BRIDGE PAINTING 214,000 13 (BASE CONSTRUCTION ALLOCATION - 14 $186,000) 15 (DESIGN AND CONTINGENCIES - $28,000) 16 (8) SR 1049, RAPP'S DAM COVERED BRIDGE, 17 EAST PIKELAND TOWNSHIP, BRIDGE 18 PAINTING 47,000 19 (BASE CONSTRUCTION ALLOCATION - 20 $41,000) 21 (DESIGN AND CONTINGENCIES - $6,000) 22 (9) SR 2011, PHOENIXVILLE PIKE BRIDGE 23 UNDER ABANDONED PENN CENTRAL RAILROAD, 24 WEST GOSHEN TOWNSHIP, BRIDGE REMOVAL 125,000 25 (BASE CONSTRUCTION ALLOCATION - 26 $100,000) 27 (LAND ALLOCATION - $10,000) 28 (DESIGN AND CONTINGENCIES - $15,000) 29 (10) SR 2018, GREEN HILL ROAD BRIDGE UNDER 30 ABANDONED PENN CENTRAL RAILROAD, WEST 19970H0030B0757 - 122 -
1 GOSHEN TOWNSHIP, BRIDGE REMOVAL 125,000 2 (BASE CONSTRUCTION ALLOCATION - 3 $100,000) 4 (LAND ALLOCATION - $10,000) 5 (DESIGN AND CONTINGENCIES - $15,000) 6 (11) SR 3045, SPRINGDELL ROAD BRIDGE UNDER 7 ABANDONED PENN CENTRAL RAILROAD, WEST 8 MARBOROUGH TOWNSHIP, BRIDGE REMOVAL 125,000 9 (BASE CONSTRUCTION ALLOCATION - 10 $100,000) 11 (LAND ALLOCATION - $10,000) 12 (DESIGN AND CONTINGENCIES - $15,000) 13 (12) SR 3049, HILLTOP VIEW ROAD BRIDGE 14 OVER BUCK AND DOE RUN CREEK, NEWLIN 15 TOWNSHIP, BRIDGE REPLACEMENT 1,450,000 16 (BASE CONSTRUCTION ALLOCATION - 17 $1,300,000) 18 (LAND ALLOCATION - $50,000) 19 (DESIGN AND CONTINGENCIES - $100,000) 20 (13) SR 1012, BRIDGE OVER TROUT CREEK, 21 TREDYFFRIN TOWNSHIP, BRIDGE 22 REPLACEMENT 850,000 23 (BASE CONSTRUCTION ALLOCATION - 24 $550,000) 25 (LAND ALLOCATION - $50,000) 26 (DESIGN AND CONTINGENCIES - $250,000) 27 SECTION 20. CLARION COUNTY. 28 (A) LOCAL BRIDGES 29 (1) BEAVER TOWNSHIP, T-400, CANOE CREEK 30 BRIDGE OVER CANOE CREEK, BRIDGE 19970H0030B0757 - 123 -
1 REPLACEMENT 380,000 2 (BASE CONSTRUCTION ALLOCATION - 3 $300,000) 4 (LAND ALLOCATION - $10,000) 5 (DESIGN AND CONTINGENCIES - $70,000) 6 (2) BEAVER TOWNSHIP, T-422, DEER CREEK 7 BRIDGE OVER DEER CREEK, BRIDGE 8 REPLACEMENT 540,000 9 (BASE CONSTRUCTION ALLOCATION - 10 $450,000) 11 (LAND ALLOCATION - $30,000) 12 (DESIGN AND CONTINGENCIES - $60,000) 13 (3) CLARION AND MILLCREEK TOWNSHIPS, T- 14 490, MILL CREEK BRIDGE OVER MILL CREEK, 15 BRIDGE REPLACEMENT 540,000 16 (BASE CONSTRUCTION ALLOCATION - 17 $450,000) 18 (LAND ALLOCATION - $10,000) 19 (DESIGN AND CONTINGENCIES - $80,000) 20 (4) ELK TOWNSHIP, T-424, DEER CREEK BRIDGE 21 OVER DEER CREEK, BRIDGE REPLACEMENT 545,000 22 (BASE CONSTRUCTION ALLOCATION - 23 $425,000) 24 (LAND ALLOCATION - $20,000) 25 (DESIGN AND CONTINGENCIES - $100,000) 26 (5) FARMINGTON TOWNSHIP, T-562, WALLEY RUN 27 BRIDGE OVER WALLEY RUN, BRIDGE 28 REPLACEMENT 375,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $300,000) 19970H0030B0757 - 124 -
1 (LAND ALLOCATION - $5,000) 2 (DESIGN AND CONTINGENCIES - $70,000) 3 (6) KNOX TOWNSHIP, T-850, TOBY CREEK 4 BRIDGE OVER TOBY CREEK, BRIDGE 5 REPLACEMENT 480,000 6 (BASE CONSTRUCTION ALLOCATION - 7 $400,000) 8 (LAND ALLOCATION - $20,000) 9 (DESIGN AND CONTINGENCIES - $60,000) 10 (7) KNOX TOWNSHIP, T-600, LICKING CREEK 11 BRIDGE OVER LICKING CREEK, BRIDGE 12 REPLACEMENT 445,000 13 (BASE CONSTRUCTION ALLOCATION - 14 $350,000) 15 (LAND ALLOCATION - $15,000) 16 (DESIGN AND CONTINGENCIES - $80,000) 17 (8) MADISON TOWNSHIP, T-460, RED BANK 18 CREEK BRIDGE OVER TRIBUTARY OF RED BANK 19 CREEK, BRIDGE REPLACEMENT 390,000 20 (BASE CONSTRUCTION ALLOCATION - 21 $300,000) 22 (LAND ALLOCATION - $20,000) 23 (DESIGN AND CONTINGENCIES - $70,000) 24 (9) PORTER TOWNSHIP, T-462, FIDDLERS RUN 25 BRIDGE OVER FIDDLERS RUN, BRIDGE 26 REPLACEMENT 390,000 27 (BASE CONSTRUCTION ALLOCATION - 28 $300,000) 29 (LAND ALLOCATION - $10,000) 30 (DESIGN AND CONTINGENCIES - $80,000) 19970H0030B0757 - 125 -
1 (10) PORTER TOWNSHIP, T-472, LEATHERWOOD 2 CREEK BRIDGE OVER LEATHERWOOD CREEK, 3 BRIDGE REPLACEMENT 455,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $375,000) 6 (LAND ALLOCATION - $20,000) 7 (DESIGN AND CONTINGENCIES - $60,000) 8 (11) PORTER TOWNSHIP, T-750, LEISURE RUN 9 BRIDGE OVER LEISURE RUN, BRIDGE 10 REPLACEMENT 390,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $300,000) 13 (LAND ALLOCATION - $10,000) 14 (DESIGN AND CONTINGENCIES - $80,000) 15 (12) RED BANK TOWNSHIP, T-840, BEAVER 16 CREEK BRIDGE OVER BEAVER CREEK, BRIDGE 17 REPLACEMENT 420,000 18 (BASE CONSTRUCTION ALLOCATION - 19 $350,000) 20 (LAND ALLOCATION - $15,000) 21 (DESIGN AND CONTINGENCIES - $55,000) 22 (13) RED BANK TOWNSHIP, T-508, COUNTY 23 BRIDGE NO.46, PINE CREEK BRIDGE OVER 24 PINE CREEK, BRIDGE REPLACEMENT 378,000 25 (BASE CONSTRUCTION ALLOCATION - 26 $300,000) 27 (LAND ALLOCATION - $8,000) 28 (DESIGN AND CONTINGENCIES - $70,000) 29 (14) RICHLAND TOWNSHIP, T-382, TURKEY RUN 30 BRIDGE OVER TURKEY RUN, BRIDGE 19970H0030B0757 - 126 -
1 REPLACEMENT 360,000 2 (BASE CONSTRUCTION ALLOCATION - 3 $300,000) 4 (LAND ALLOCATION - $10,000) 5 (DESIGN AND CONTINGENCIES - $50,000) 6 (15) RICHLAND TOWNSHIP, T-382, TURKEY RUN 7 BRIDGE OVER TURKEY RUN, BRIDGE 8 REPLACEMENT 360,000 9 (BASE CONSTRUCTION ALLOCATION - 10 $300,000) 11 (LAND ALLOCATION - $10,000) 12 (DESIGN AND CONTINGENCIES - $50,000) 13 (16) SLIGO BOROUGH, MADISON STREET BRIDGE 14 OVER LITTLE LICKING CREEK, BRIDGE 15 REPLACEMENT 445,000 16 (BASE CONSTRUCTION ALLOCATION - 17 $350,000) 18 (LAND ALLOCATION - $15,000) 19 (DESIGN AND CONTINGENCIES - $80,000) 20 (17) BEAVER TOWNSHIP, T-332, BRIDGE NO.17 21 OVER BEAVER CREEK, BRIDGE REPLACEMENT 560,000 22 (BASE CONSTRUCTION ALLOCATION - 23 $400,000) 24 (LAND ALLOCATION - $10,000) 25 (DESIGN AND CONTINGENCIES - $150,000) 26 (18) BEAVER TOWNSHIP, T-385 OVER CANOE 27 CREEK, BRIDGE REPLACEMENT 490,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $320,000) 30 (LAND ALLOCATION - $80,000) 19970H0030B0757 - 127 -
1 (DESIGN AND CONTINGENCIES - $90,000) 2 (19) HIGHLAND TOWNSHIP, T-573 OVER TOBY 3 CREEK, BRIDGE REPLACEMENT 500,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $360,000) 6 (LAND ALLOCATION - $40,000) 7 (DESIGN AND CONTINGENCIES - $100,000) 8 (20) KNOX TOWNSHIP, T-850 OVER STEP CREEK, 9 BRIDGE REPLACEMENT 240,000 10 (BASE CONSTRUCTION ALLOCATION - 11 $180,000) 12 (LAND ALLOCATION - $20,000) 13 (DESIGN AND CONTINGENCIES - $40,000) 14 (21) PERRY TOWNSHIP, T-301, BRIDGE 15 REPLACEMENT 200,000 16 (BASE CONSTRUCTION ALLOCATION - 17 $130,000) 18 (LAND ALLOCATION - $30,000) 19 (DESIGN AND CONTINGENCIES - $40,000) 20 (22) MILLCREEK TOWNSHIP, T-564 OVER LITTLE 21 MILL CREEK, BRIDGE REPLACEMENT 380,000 22 (BASE CONSTRUCTION ALLOCATION - 23 $300,000) 24 (LAND ALLOCATION - $10,000) 25 (DESIGN AND CONTINGENCIES - $70,000) 26 (23) PAINT TOWNSHIP, T-578 OVER STEP 27 CREEK, BRIDGE REPLACEMENT 360,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $300,000) 30 (LAND ALLOCATION - $10,000) 19970H0030B0757 - 128 -
1 (DESIGN AND CONTINGENCIES - $50,000) 2 (24) MONROE TOWNSHIP, T-486, COUNTY BRIDGE 3 NO.22 OVER PINEY CREEK, BRIDGE 4 REPLACEMENT 480,000 5 (BASE CONSTRUCTION ALLOCATION - 6 $400,000) 7 (LAND ALLOCATION - $10,000) 8 (DESIGN AND CONTINGENCIES - $70,000) 9 (25) CLARION TOWNSHIP, T-532 OVER BRUSH 10 RUN, BRIDGE REPLACEMENT 245,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $200,000) 13 (LAND ALLOCATION - $10,000) 14 (DESIGN AND CONTINGENCIES - $35,000) 15 (26) CLARION TOWNSHIP, T-561 OVER JONES 16 RUN, BRIDGE REPLACEMENT 245,000 17 (BASE CONSTRUCTION ALLOCATION - 18 $200,000) 19 (LAND ALLOCATION - $10,000) 20 (DESIGN AND CONTINGENCIES - $35,000) 21 (27) ELK TOWNSHIP, T-582 OVER MAHLES RUN, 22 BRIDGE REPLACEMENT 245,000 23 (BASE CONSTRUCTION ALLOCATION - 24 $200,000) 25 (LAND ALLOCATION - $10,000) 26 (DESIGN AND CONTINGENCIES - $35,000) 27 (28) FARMINGTON TOWNSHIP, T-609 OVER ENGLE 28 RUN, BRIDGE REPLACEMENT 245,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $200,000) 19970H0030B0757 - 129 -
1 (LAND ALLOCATION - $10,000) 2 (DESIGN AND CONTINGENCIES - $35,000) 3 (29) PAINT TOWNSHIP, T-577 OVER TOBY 4 CREEK, BRIDGE REPLACEMENT 106,000 5 (BASE CONSTRUCTION ALLOCATION - 6 $100,000) 7 (LAND ALLOCATION - $1,000) 8 (DESIGN AND CONTINGENCIES - $5,000) 9 (30) PAINT TOWNSHIP, T-576 OVER TOBY 10 CREEK, BRIDGE REPLACEMENT 106,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $100,000) 13 (LAND ALLOCATION - $1,000) 14 (DESIGN AND CONTINGENCIES - $5,000) 15 (31) BEAVER TOWNSHIP, T-405 OVER CANOE 16 CREEK, BRIDGE REPLACEMENT 106,000 17 (BASE CONSTRUCTION ALLOCATION - 18 $100,000) 19 (LAND ALLOCATION - $1,000) 20 (DESIGN AND CONTINGENCIES - $5,000) 21 (32) BEAVER TOWNSHIP, T-411 OVER BOYD RUN, 22 BRIDGE REPLACEMENT 106,000 23 (BASE CONSTRUCTION ALLOCATION - 24 $100,000) 25 (LAND ALLOCATION - $1,000) 26 (DESIGN AND CONTINGENCIES - $5,000) 27 (33) ELK TOWNSHIP, T-424 OVER DEER CREEK, 28 BRIDGE REPLACEMENT 250,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $200,000) 19970H0030B0757 - 130 -
1 (LAND ALLOCATION - $10,000) 2 (DESIGN AND CONTINGENCIES - $40,000) 3 (34) PAINT TOWNSHIP, T-578, STEINER ROAD 4 BRIDGE OVER STEP CREEK, BRIDGE 5 REPLACEMENT 500,000 6 (BASE CONSTRUCTION ALLOCATION - 7 $400,000) 8 (LAND ALLOCATION - $20,000) 9 (DESIGN AND CONTINGENCIES - $80,000) 10 (35) ASHLAND TOWNSHIP, T-863, BRIDGE OVER 11 LITTLE CANOE CREEK, BRIDGE REPLACEMENT 330,000 12 (BASE CONSTRUCTION ALLOCATION - 13 $200,000) 14 (LAND ALLOCATION - $10,000) 15 (DESIGN AND CONTINGENCIES - $120,000) 16 (36) BEAVER TOWNSHIP, T-325, SCHETTLER 17 ROAD BRIDGE OVER CANOE CREEK, BRIDGE 18 REPLACEMENT 395,000 19 (BASE CONSTRUCTION ALLOCATION - 20 $250,000) 21 (LAND ALLOCATION - $15,000) 22 (DESIGN AND CONTINGENCIES - $130,000) 23 (37) MADISON TOWNSHIP, T-442, BRIDGE NO.34 24 OVER WILDCAT RUN, BRIDGE REPLACEMENT 425,000 25 (BASE CONSTRUCTION ALLOCATION - 26 $275,000) 27 (LAND ALLOCATION - $10,000) 28 (DESIGN AND CONTINGENCIES - $140,000) 29 (38) MADISON TOWNSHIP, T-689, BRIDGE NO.33 30 OVER WILDCAT RUN, BRIDGE REPLACEMENT 460,000 19970H0030B0757 - 131 -
1 (BASE CONSTRUCTION ALLOCATION - 2 $300,000) 3 (LAND ALLOCATION - $10,000) 4 (DESIGN AND CONTINGENCIES - $150,000) 5 (39) MADISON TOWNSHIP, T-880, BRIDGE 6 NO.2050 OVER TURKEY RUN, BRIDGE 7 REPLACEMENT 330,000 8 (BASE CONSTRUCTION ALLOCATION - 9 $200,000) 10 (LAND ALLOCATION - $10,000) 11 (DESIGN AND CONTINGENCIES - $120,000) 12 (B) STATE BRIDGES 13 (1) SR 0058, CALLENSBURG BRIDGE OVER 14 CLARION RIVER, LICKING TOWNSHIP, BRIDGE 15 PAINTING 365,000 16 (BASE CONSTRUCTION ALLOCATION - 17 $350,000) 18 (DESIGN AND CONTINGENCIES - $15,000) 19 (2) SR 0080, BEAVER CREEK EASTBOUND BRIDGE 20 OVER BEAVER CREEK, BEAVER TOWNSHIP, 21 BRIDGE PAINTING 390,000 22 (BASE CONSTRUCTION ALLOCATION - 23 $375,000) 24 (DESIGN AND CONTINGENCIES - $15,000) 25 (3) SR 0080, BEAVER CREEK WESTBOUND BRIDGE 26 OVER BEAVER CREEK, BEAVER TOWNSHIP, 27 BRIDGE PAINTING 390,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $375,000) 30 (DESIGN AND CONTINGENCIES - $15,000) 19970H0030B0757 - 132 -
1 (4) SR 0080, CANOE CREEK EASTBOUND BRIDGE 2 OVER CANOE CREEK, BEAVER TOWNSHIP, 3 BRIDGE PAINTING 1,230,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $1,200,000) 6 (DESIGN AND CONTINGENCIES - $30,000) 7 (5) SR 0080, CANOE CREEK WESTBOUND BRIDGE 8 OVER CANOE CREEK, BEAVER TOWNSHIP, 9 BRIDGE PAINTING 1,290,000 10 (BASE CONSTRUCTION ALLOCATION - 11 $1,260,000) 12 (DESIGN AND CONTINGENCIES - $30,000) 13 (6) SR 0080, TR 558 BRIDGE OVER I-80, 14 CLARION TOWNSHIP, BRIDGE PAINTING 195,000 15 (BASE CONSTRUCTION ALLOCATION - 16 $180,000) 17 (DESIGN AND CONTINGENCIES - $15,000) 18 (7) SR 0322, EXIT 11 BRIDGE OVER I-80, 19 CLARION TOWNSHIP, CLARION BRIDGE 20 PAINTING 205,000 21 (BASE CONSTRUCTION ALLOCATION - 22 $190,000) 23 (DESIGN AND CONTINGENCIES - $15,000) 24 (8) SR 0536, MAYPORT BRIDGE OVER REDBANK 25 CREEK, RED BANK TOWNSHIP, BRIDGE 26 PAINTING 215,000 27 (BASE CONSTRUCTION ALLOCATION - 28 $200,000) 29 (DESIGN AND CONTINGENCIES - $15,000) 30 (9) SR 1009, BRUSH CREEK BRIDGE OVER BRUSH 19970H0030B0757 - 133 -
1 CREEK, CLARION TOWNSHIP, BRIDGE 2 PAINTING 70,000 3 (BASE CONSTRUCTION ALLOCATION - 4 $55,000) 5 (DESIGN AND CONTINGENCIES - $15,000) 6 (10) SR 2001, PINEY CREEK BRIDGE OVER 7 PINEY CREEK, LIMESTONE TOWNSHIP, BRIDGE 8 PAINTING 85,000 9 (BASE CONSTRUCTION ALLOCATION - 10 $70,000) 11 (DESIGN AND CONTINGENCIES - $15,000) 12 (11) SR 2001, LITTLE PINEY CREEK BRIDGE 13 OVER LITTLE PINEY CREEK, LIMESTONE 14 TOWNSHIP, BRIDGE PAINTING 70,000 15 (BASE CONSTRUCTION ALLOCATION - 16 $55,000) 17 (DESIGN AND CONTINGENCIES - $15,000) 18 (12) SR 2005, GLADE RUN BRIDGE OVER GLADE 19 RUN, LIMESTONE TOWNSHIP, BRIDGE 20 PAINTING 60,000 21 (BASE CONSTRUCTION ALLOCATION - 22 $45,000) 23 (DESIGN AND CONTINGENCIES - $15,000) 24 (13) SR 2007, LICKING CREEK BRIDGE OVER 25 LICKING CREEK, MONROE TOWNSHIP, BRIDGE 26 PAINTING 75,000 27 (BASE CONSTRUCTION ALLOCATION - 28 $60,000) 29 (DESIGN AND CONTINGENCIES - $15,000) 30 (14) SR 2009, LAWSONHAM BRIDGE OVER 19970H0030B0757 - 134 -
1 REDBANK CREEK, MADISON TOWNSHIP, BRIDGE 2 PAINTING 195,000 3 (BASE CONSTRUCTION ALLOCATION - 4 $180,000) 5 (DESIGN AND CONTINGENCIES - $15,000) 6 (15) SR 2009, WILDCAT RUN BRIDGE OVER 7 WILDCAT RUN, MADISON TOWNSHIP, BRIDGE 8 PAINTING 85,000 9 (BASE CONSTRUCTION ALLOCATION - 10 $70,000) 11 (DESIGN AND CONTINGENCIES - $15,000) 12 (16) SR 2015, LITTLE PINEY CREEK BRIDGE 13 OVER LITTLE PINEY CREEK, LIMESTONE 14 TOWNSHIP, BRIDGE PAINTING 60,000 15 (BASE CONSTRUCTION ALLOCATION - 16 $45,000) 17 (DESIGN AND CONTINGENCIES - $15,000) 18 (17) SR 3020, ALUM ROCK BRIDGE OVER TURKEY 19 RUN, RICHLAND TOWNSHIP, BRIDGE 20 PAINTING 75,000 21 (BASE CONSTRUCTION ALLOCATION - 22 $60,000) 23 (DESIGN AND CONTINGENCIES - $15,000) 24 (18) SR 4003, TURKEY RUN BRIDGE OVER 25 TURKEY RUN, RICHLAND TOWNSHIP, BRIDGE 26 PAINTING 65,000 27 (BASE CONSTRUCTION ALLOCATION - 28 $50,000) 29 (DESIGN AND CONTINGENCIES - $15,000) 30 (19) SR 4005, CANOE CREEK BRIDGE OVER 19970H0030B0757 - 135 -
1 CANOE CREEK, BEAVER TOWNSHIP, BRIDGE 2 PAINTING 70,000 3 (BASE CONSTRUCTION ALLOCATION - 4 $55,000) 5 (DESIGN AND CONTINGENCIES - $15,000) 6 (20) SR 0208, CONRAIL OVERPASS, ELK 7 TOWNSHIP, BRIDGE REMOVAL 55,000 8 (BASE CONSTRUCTION ALLOCATION - 9 $50,000) 10 (DESIGN AND CONTINGENCIES - $5,000) 11 (21) SR 0322, CONRAIL OVERPASS, ELK 12 TOWNSHIP, BRIDGE REMOVAL 210,000 13 (BASE CONSTRUCTION ALLOCATION - 14 $200,000) 15 (DESIGN AND CONTINGENCIES - $10,000) 16 (22) SR 1011, LAKE ERIE, FRANKLIN AND 17 CLARION RAILROAD OVERPASS, CLARION 18 TOWNSHIP, BRIDGE REMOVAL 12,000 19 (BASE CONSTRUCTION ALLOCATION - 20 $10,000) 21 (DESIGN AND CONTINGENCIES - $2,000) 22 (23) SR 0066, BRIDGE OVER PINEY CREEK, 23 LIMESTONE TOWNSHIP, BRIDGE REPLACEMENT 650,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $500,000) 26 (LAND ALLOCATION - $20,000) 27 (DESIGN AND CONTINGENCIES - $130,000) 28 (24) SR 0066, BRIDGE OVER LITTLE PINEY 29 CREEK, LIMESTONE TOWNSHIP, BRIDGE 30 REPLACEMENT 600,000 19970H0030B0757 - 136 -
1 (BASE CONSTRUCTION ALLOCATION - 2 $450,000) 3 (LAND ALLOCATION - $20,000) 4 (DESIGN AND CONTINGENCIES - $130,000) 5 (25) SR 0068, BRIDGE OVER BRUSH RUN, 6 MONROE TOWNSHIP, BRIDGE REPLACEMENT 650,000 7 (BASE CONSTRUCTION ALLOCATION - 8 $500,000) 9 (LAND ALLOCATION - $20,000) 10 (DESIGN AND CONTINGENCIES - $130,000) 11 (26) SR 0208, BRIDGE OVER CANOE CREEK, 12 BEAVER TOWNSHIP, BRIDGE REPLACEMENT 550,000 13 (BASE CONSTRUCTION ALLOCATION - 14 $400,000) 15 (LAND ALLOCATION - $20,000) 16 (DESIGN AND CONTINGENCIES - $130,000) 17 (27) SR 2001, BRIDGE OVER LITTLE PINEY 18 CREEK, LIMESTONE TOWNSHIP, BRIDGE 19 REPLACEMENT 490,000 20 (BASE CONSTRUCTION ALLOCATION - 21 $350,000) 22 (LAND ALLOCATION - $20,000) 23 (DESIGN AND CONTINGENCIES - $120,000) 24 (28) SR 0208, SR 0208 OVER DEER CREEK, ELK 25 TOWNSHIP, BRIDGE REPLACEMENT 505,000 26 (BASE CONSTRUCTION ALLOCATION - 27 $450,000) 28 (LAND ALLOCATION - $5,000) 29 (DESIGN AND CONTINGENCIES - $50,000) 30 (29) SR 2007, SR 2007 OVER DEER CREEK, 19970H0030B0757 - 137 -
1 BEAVER TOWNSHIP, BRIDGE REPLACEMENT 455,000 2 (BASE CONSTRUCTION ALLOCATION - 3 $400,000) 4 (LAND ALLOCATION - $5,000) 5 (DESIGN AND CONTINGENCIES - $50,000) 6 (30) SR 4005, SR 4005 OVER CANOE CREEK, 7 BEAVER TOWNSHIP, BRIDGE REPLACEMENT 405,000 8 (BASE CONSTRUCTION ALLOCATION - 9 $350,000) 10 (LAND ALLOCATION - $5,000) 11 (DESIGN AND CONTINGENCIES - $50,000) 12 (31) SR 4008, SR 4008 OVER PAINT CREEK, 13 KNOX TOWNSHIP, BRIDGE REPLACEMENT 505,000 14 (BASE CONSTRUCTION ALLOCATION - 15 $450,000) 16 (LAND ALLOCATION - $5,000) 17 (DESIGN AND CONTINGENCIES - $50,000) 18 SECTION 21. CLEARFIELD COUNTY. 19 (A) LOCAL BRIDGES 20 (1) KNOX TOWNSHIP, T-565 BRIDGE OVER POTTS 21 RUN, BRIDGE REPLACEMENT 510,000 22 (BASE CONSTRUCTION ALLOCATION - 23 $350,000) 24 (LAND ALLOCATION - $10,000) 25 (DESIGN AND CONTINGENCIES - $150,000) 26 (2) HOUTZDALE BOROUGH, MCATEER STREET 27 BRIDGE, BRIDGE REPLACEMENT 430,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $270,000) 30 (LAND ALLOCATION - $20,000) 19970H0030B0757 - 138 -
1 (DESIGN AND CONTINGENCIES - $140,000) 2 (3) PENN TOWNSHIP, T-461 OVER BELL RUN, 3 BRIDGE REPLACEMENT 106,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $100,000) 6 (LAND ALLOCATION - $1,000) 7 (DESIGN AND CONTINGENCIES - $5,000) 8 (B) STATE BRIDGES 9 (1) SR 0879, BRIDGE OVER US 322 NEAR 10 CLEARFIELD MALL, LAWRENCE TOWNSHIP, 11 BRIDGE PAINTING 644,000 12 (BASE CONSTRUCTION ALLOCATION - 13 $614,000) 14 (DESIGN AND CONTINGENCIES - $30,000) 15 (2) SR 0729, BRIDGE OVER MUDDY RUN, 16 BECCARIA TOWNSHIP, BRIDGE PAINTING 35,000 17 (BASE CONSTRUCTION ALLOCATION - 18 $30,000) 19 (DESIGN AND CONTINGENCIES - $5,000) 20 (3) SR 0879, BRIDGE OVER SUSQUEHANNA 21 RIVER, LAWRENCE TOWNSHIP, BRIDGE 22 PAINTING 183,000 23 (BASE CONSTRUCTION ALLOCATION - 24 $163,000) 25 (DESIGN AND CONTINGENCIES - $20,000) 26 (4) SR 0970, BRIDGE OVER MOSHANNON CREEK, 27 OSCEOLA MILLS, BRIDGE PAINTING 145,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $120,000) 30 (DESIGN AND CONTINGENCIES - $25,000) 19970H0030B0757 - 139 -
1 (5) SR 0970, BRIDGE OVER SUSQUEHANNA 2 RIVER, VILLAGE OF SHAWVILLE, BRIDGE 3 PAINTING 163,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $143,000) 6 (DESIGN AND CONTINGENCIES - $20,000) 7 (6) SR 1009, BRIDGE OVER ALDER RUN, MORRIS 8 TOWNSHIP, BRIDGE PAINTING 18,000 9 (BASE CONSTRUCTION ALLOCATION - 10 $15,000) 11 (DESIGN AND CONTINGENCIES - $3,000) 12 (7) SR 1014, BRIDGE OVER ALDER RUN, GRAHAM 13 TOWNSHIP, BRIDGE PAINTING 18,000 14 (BASE CONSTRUCTION ALLOCATION - 15 $15,000) 16 (DESIGN AND CONTINGENCIES - $3,000) 17 (8) SR 2010, BRIDGE OVER BEAVER RUN, 18 WOODWARD TOWNSHIP, BRIDGE PAINTING 18,000 19 (BASE CONSTRUCTION ALLOCATION - 20 $15,000) 21 (DESIGN AND CONTINGENCIES - $3,000) 22 (9) SR 2024, BRIDGE OVER CONRAIL, PIKE 23 TOWNSHIP, BRIDGE PAINTING 28,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $24,000) 26 (DESIGN AND CONTINGENCIES - $4,000) 27 (10) SR 3001, BRIDGE OVER CHEST CREEK, 28 MAHAFFEY BOROUGH, BRIDGE REPLACEMENT 1,750,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $1,300,000) 19970H0030B0757 - 140 -
1 (LAND ALLOCATION - $150,000) 2 (DESIGN AND CONTINGENCIES - $300,000) 3 (11) SR 3012, BRIDGE OVER MATTHEWS RUN, 4 BECCARIA TOWNSHIP, BRIDGE PAINTING 18,000 5 (BASE CONSTRUCTION ALLOCATION - 6 $15,000) 7 (DESIGN AND CONTINGENCIES - $3,000) 8 (12) SR 3012, BRIDGE OVER CLEARFIELD 9 CREEK, BECCARIA TOWNSHIP, BRIDGE 10 PAINTING 100,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $90,000) 13 (DESIGN AND CONTINGENCIES - $10,000) 14 (13) SR 0219, SR 0219 OVER BEAR RUN, BELL 15 TOWNSHIP, BRIDGE REPLACEMENT 505,000 16 (BASE CONSTRUCTION ALLOCATION - 17 $450,000) 18 (LAND ALLOCATION - $5,000) 19 (DESIGN AND CONTINGENCIES - $50,000) 20 (14) SR 2014, BRIDGE OVER COAL RUN, 21 DECATUR TOWNSHIP, BRIDGE REPLACEMENT 692,000 22 (BASE CONSTRUCTION ALLOCATION - 23 $512,000) 24 (LAND ALLOCATION - $30,000) 25 (DESIGN AND CONTINGENCIES - $150,000) 26 (15) SR 3012, BRIDGE OVER CLEARFIELD 27 CREEK, BECCARIA TOWNSHIP, BRIDGE 28 PAINTING 18,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $15,000) 19970H0030B0757 - 141 -
1 (DESIGN AND CONTINGENCIES - $3,000) 2 SECTION 22. CLINTON COUNTY. 3 (A) LOCAL BRIDGES 4 (1) MILL HALL BOROUGH, CHURCH STREET OVER 5 FISHING CREEK, BRIDGE REHABILITATION 5,000 6 (BASE CONSTRUCTION ALLOCATION - $4,000) 7 (DESIGN AND CONTINGENCIES - $1,000) 8 (B) STATE BRIDGES 9 (1) SR 0044, BRIDGE OVER SR 0220, 1 MILE 10 NORTHEAST OF AVIS, PINE CREEK TOWNSHIP, 11 BRIDGE PAINTING 580,000 12 (BASE CONSTRUCTION ALLOCATION - 13 $525,000) 14 (DESIGN AND CONTINGENCIES - $55,000) 15 (2) SR 0080, LAMAR INTERCHANGE (TWO 16 BRIDGES) OVER PA 64 AT EXIT 25, PORTER 17 TOWNSHIP, BRIDGE REHABILITATION 4,100,000 18 (BASE CONSTRUCTION ALLOCATION - 19 $3,400,000) 20 (DESIGN AND CONTINGENCIES - $700,000) 21 (3) SR 0144, BRIDGE OVER KETTLE CREEK, 1 22 MILE EAST OF HAMMERSLEY FORK, LEIDY 23 TOWNSHIP, BRIDGE PAINTING 660,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $600,000) 26 (DESIGN AND CONTINGENCIES - $60,000) 27 SECTION 23. COLUMBIA COUNTY. 28 (A) LOCAL BRIDGES (RESERVED) 29 (B) STATE BRIDGES 30 (1) SR 0044, CHILLISQUAQUE CREEK BRIDGE 19970H0030B0757 - 142 -
1 OVER CHILLISQUAQUE CREEK, 3 MILES 2 NORTHWEST OF JERSEYTOWN, BRIDGE 3 REPLACEMENT 477,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $382,000) 6 (LAND ALLOCATION - $24,000) 7 (DESIGN AND CONTINGENCIES - $71,000) 8 (2) SR 0093, BRIDGE OVER NORTH BRANCH OF 9 BRIAR CREEK, BRIDGE REPLACEMENT 350,000 10 (BASE CONSTRUCTION ALLOCATION - 11 $275,000) 12 (LAND ALLOCATION - $15,000) 13 (DESIGN AND CONTINGENCIES - $60,000) 14 (3) SR 0093, BRIAR CREEK BRIDGE OVER BRIAR 15 CREEK, 3 MILES WEST OF BERWICK, BRIDGE 16 REPLACEMENT 392,000 17 (BASE CONSTRUCTION ALLOCATION - 18 $315,000) 19 (LAND ALLOCATION - $18,000) 20 (DESIGN AND CONTINGENCIES - $59,000) 21 (4) SR 0239, WEST CREEK BRIDGE OVER WEST 22 CREEK, SOUTHEAST OF BENTON AND 23 SUGARLOAF TOWNSHIPS, BRIDGE 24 REPLACEMENT 670,000 25 (BASE CONSTRUCTION ALLOCATION - 26 $536,000) 27 (LAND ALLOCATION - $34,000) 28 (DESIGN AND CONTINGENCIES - $100,000) 29 (5) SR 0442, WEST BRANCH RUN BRIDGE OVER 30 WEST BRANCH RUN, 1.5 MILES NORTH OF 19970H0030B0757 - 143 -
1 IOLA, BRIDGE REPLACEMENT 206,000 2 (BASE CONSTRUCTION ALLOCATION - 3 $165,000) 4 (LAND ALLOCATION - $10,000) 5 (DESIGN AND CONTINGENCIES - $31,000) 6 (6) SR 1004, ERIE-LACKAWANNA RAILROAD 7 BRIDGE, VIADUCT OVER CONRAIL, SOUTH 8 CENTRE TOWNSHIP, BRIDGE REPLACEMENT 1,900,000 9 (BASE CONSTRUCTION ALLOCATION - 10 $1,600,000) 11 (LAND ALLOCATION - $110,000) 12 (DESIGN AND CONTINGENCIES - $190,000) 13 (7) SR 1019, BRIAR CREEK BRIDGE OVER BRIAR 14 CREEK, BRIAR CREEK TOWNSHIP, BRIDGE 15 REPLACEMENT 404,000 16 (BASE CONSTRUCTION ALLOCATION - 17 $323,000) 18 (LAND ALLOCATION - $20,000) 19 (DESIGN AND CONTINGENCIES - $61,000) 20 (8) SR 4012, LITTLE HEMLOCK CREEK BRIDGE 21 OVER LITTLE HEMLOCK CREEK, 10 MILES 22 SOUTHEAST OF JERSEYTOWN, BRIDGE 23 REPLACEMENT 284,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $227,000) 26 (LAND ALLOCATION - $14,000) 27 (DESIGN AND CONTINGENCIES - $43,000) 28 (9) SR 4037, MUD RUN BRIDGE OVER MUD RUN, 29 5 MILES NORTHWEST OF MILLVILLE BOROUGH, 30 BRIDGE REPLACEMENT 307,000 19970H0030B0757 - 144 -
1 (BASE CONSTRUCTION ALLOCATION - 2 $246,000) 3 (LAND ALLOCATION - $15,000) 4 (DESIGN AND CONTINGENCIES - $46,000) 5 (10) SR 0011, BRIDGE OVER FISHING CREEK, 6 BRIDGE PAINTING 530,000 7 (BASE CONSTRUCTION ALLOCATION - 8 $520,000) 9 (DESIGN AND CONTINGENCIES - $10,000) 10 (11) SR 1022, BRIDGE OVER FISHING CREEK, 11 BRIDGE PAINTING 380,000 12 (BASE CONSTRUCTION ALLOCATION - 13 $370,000) 14 (DESIGN AND CONTINGENCIES - $10,000) 15 (12) SR 1022, BRIDGE OVER OLD CHANNEL, 16 BRIDGE PAINTING 125,000 17 (BASE CONSTRUCTION ALLOCATION - 18 $115,000) 19 (DESIGN AND CONTINGENCIES - $10,000) 20 (13) SR 4009, BRIDGE OVER FISHING CREEK, 21 BRIDGE PAINTING 315,000 22 (BASE CONSTRUCTION ALLOCATION - 23 $305,000) 24 (DESIGN AND CONTINGENCIES - $10,000) 25 (14) SR 0042, SR 0042 OVER ROARING CREEK, 26 CONYNGHAM TOWNSHIP, BRIDGE REPLACEMENT 457,000 27 (BASE CONSTRUCTION ALLOCATION - 28 $366,000) 29 (LAND ALLOCATION - $23,000) 30 (DESIGN AND CONTINGENCIES - $68,000) 19970H0030B0757 - 145 -
1 (15) SR 0239, SR 0239 OVER WEST CREEK, 2 BENTON TOWNSHIP, BRIDGE REPLACEMENT 760,000 3 (BASE CONSTRUCTION ALLOCATION - 4 $560,000) 5 (LAND ALLOCATION - $35,000) 6 (DESIGN AND CONTINGENCIES - $165,000) 7 (16) SR 0254, SR 0254 OVER LITTLE FISHING 8 CREEK, MILLVILLE BOROUGH, BRIDGE 9 REPLACEMENT 1,020,000 10 (BASE CONSTRUCTION ALLOCATION - 11 $816,000) 12 (LAND ALLOCATION - $51,000) 13 (DESIGN AND CONTINGENCIES - $153,000) 14 (17) SR 0339, SR 0339 OVER BEAVER RUN, 15 BEAVER TOWNSHIP, BRIDGE REPLACEMENT 320,000 16 (BASE CONSTRUCTION ALLOCATION - 17 $256,000) 18 (LAND ALLOCATION - $16,000) 19 (DESIGN AND CONTINGENCIES - $48,000) 20 (18) SR 0487, SR 0487 OVER STONY BROOK, 21 ORANGE TOWNSHIP, BRIDGE REPLACEMENT 380,000 22 (BASE CONSTRUCTION ALLOCATION - 23 $304,000) 24 (LAND ALLOCATION - $19,000) 25 (DESIGN AND CONTINGENCIES - $57,000) 26 (19) SR 1014, SR 1014 OVER LITTLE BRIAR 27 CREEK, BRIAR CREEK TOWNSHIP, BRIDGE 28 REPLACEMENT 415,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $332,000) 19970H0030B0757 - 146 -
1 (LAND ALLOCATION - $21,000) 2 (DESIGN AND CONTINGENCIES - $62,000) 3 (20) SR 1023, SR 1023 OVER EAST BRIAR 4 CREEK, BRIAR CREEK TOWNSHIP, BRIDGE 5 REPLACEMENT 520,000 6 (BASE CONSTRUCTION ALLOCATION - 7 $466,000) 8 (LAND ALLOCATION - $29,000) 9 (DESIGN AND CONTINGENCIES - $25,000) 10 (21) SR 2003, SR 2003 OVER TRIBUTARY OF 11 ROARING CREEK, ROARING CREEK TOWNSHIP, 12 BRIDGE REPLACEMENT 171,000 13 (BASE CONSTRUCTION ALLOCATION - 14 $136,000) 15 (LAND ALLOCATION - $10,000) 16 (DESIGN AND CONTINGENCIES - $25,000) 17 (22) SR 2003, SR 2003 OVER TRIBUTARY OF 18 ROARING CREEK, LOCUST TOWNSHIP, BRIDGE 19 REPLACEMENT 245,000 20 (BASE CONSTRUCTION ALLOCATION - 21 $196,000) 22 (LAND ALLOCATION - $12,000) 23 (DESIGN AND CONTINGENCIES - $37,000) 24 (23) SR 2009, SR 2009 OVER CATAWISSA 25 CREEK, MAIN TOWNSHIP, BRIDGE 26 REPLACEMENT 436,000 27 (BASE CONSTRUCTION ALLOCATION - 28 $349,000) 29 (LAND ALLOCATION - $22,000) 30 (DESIGN AND CONTINGENCIES - $65,000) 19970H0030B0757 - 147 -
1 (24) SR 4009, SR 4009 OVER LITTLE FISHING 2 CREEK, MT. PLEASANT TOWNSHIP, BRIDGE 3 REPLACEMENT 1,232,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $986,000) 6 (LAND ALLOCATION - $61,000) 7 (DESIGN AND CONTINGENCIES - $185,000) 8 (25) SR 4033, SR 4033 OVER WOLFHOUSE RUN, 9 PINE TOWNSHIP, BRIDGE REPLACEMENT 252,000 10 (BASE CONSTRUCTION ALLOCATION - 11 $202,000) 12 (LAND ALLOCATION - $12,000) 13 (DESIGN AND CONTINGENCIES - $38,000) 14 (26) SR 4045, SR 4045 OVER GREEN CREEK, 15 GREENWOOD TOWNSHIP, BRIDGE REPLACEMENT 435,000 16 (BASE CONSTRUCTION ALLOCATION - 17 $348,000) 18 (LAND ALLOCATION - $22,000) 19 (DESIGN AND CONTINGENCIES - $65,000) 20 (27) SR 4049, SR 4049 OVER COLES CREEK, 21 SUGARLOAF TOWNSHIP, BRIDGE REPLACEMENT 1,095,000 22 (BASE CONSTRUCTION ALLOCATION - 23 $876,000) 24 (LAND ALLOCATION - $55,000) 25 (DESIGN AND CONTINGENCIES - $164,000) 26 SECTION 24. CRAWFORD COUNTY. 27 (A) LOCAL BRIDGES 28 (1) FAIRFIELD TOWNSHIP, T-636 OVER BRANCH 29 OF FRENCH CREEK, BRIDGE REPLACEMENT 108,000 30 (BASE CONSTRUCTION ALLOCATION - 19970H0030B0757 - 148 -
1 $100,000) 2 (LAND ALLOCATION - $1,000) 3 (DESIGN AND CONTINGENCIES - $7,000) 4 (2) FAIRFIELD TOWNSHIP, T-321 BRIDGE NO.1 5 OVER BRANCH OF FRENCH CREEK, BRIDGE 6 REPLACEMENT 106,000 7 (BASE CONSTRUCTION ALLOCATION - 8 $100,000) 9 (LAND ALLOCATION - $1,000) 10 (DESIGN AND CONTINGENCIES - $5,000) 11 (3) FAIRFIELD TOWNSHIP, T-321 BRIDGE NO.2 12 OVER BRANCH OF FRENCH CREEK, BRIDGE 13 REPLACEMENT 106,000 14 (BASE CONSTRUCTION ALLOCATION - 15 $100,000) 16 (LAND ALLOCATION - $1,000) 17 (DESIGN AND CONTINGENCIES - $5,000) 18 (4) SPRING TOWNSHIP, T-747 OVER BRANCH OF 19 CONNEAUT CREEK, BRIDGE REPLACEMENT 126,000 20 (BASE CONSTRUCTION ALLOCATION - 21 $120,000) 22 (LAND ALLOCATION - $1,000) 23 (DESIGN AND CONTINGENCIES - $5,000) 24 (5) WAYNE TOWNSHIP, T-347 OVER BRANCH OF 25 POWDERMILL RUN, BRIDGE REPLACEMENT 106,000 26 (BASE CONSTRUCTION ALLOCATION - 27 $100,000) 28 (LAND ALLOCATION - $1,000) 29 (DESIGN AND CONTINGENCIES - $5,000) 30 (6) WAYNE TOWNSHIP, T-457 OVER TRIBUTARY 19970H0030B0757 - 149 -
1 OF LAKE CREEK, BRIDGE REPLACEMENT 106,000 2 (BASE CONSTRUCTION ALLOCATION - 3 $100,000) 4 (LAND ALLOCATION - $1,000) 5 (DESIGN AND CONTINGENCIES - $5,000) 6 (B) STATE BRIDGES 7 (1) SR 0006, SR 0006 OVER PADAN CREEK, 8 CONNEAUT TOWNSHIP, BRIDGE REPLACEMENT 1,004,000 9 (BASE CONSTRUCTION ALLOCATION - 10 $784,000) 11 (LAND ALLOCATION - $20,000) 12 (DESIGN AND CONTINGENCIES - $200,000) 13 (2) SR 0006, SR 0006 OVER FRENCH CREEK, 14 WOODCOCK TOWNSHIP, BRIDGE REPLACEMENT 2,325,000 15 (BASE CONSTRUCTION ALLOCATION - 16 $1,840,000) 17 (LAND ALLOCATION - $20,000) 18 (DESIGN AND CONTINGENCIES - $465,000) 19 (3) SR 0079, SR 0079 UNDER MAPLE DRIVE, 20 HAYFIELD TOWNSHIP, BRIDGE REPLACEMENT 2,401,000 21 (BASE CONSTRUCTION ALLOCATION - 22 $1,901,000) 23 (LAND ALLOCATION - $20,000) 24 (DESIGN AND CONTINGENCIES - $480,000) 25 (4) SR 0089, SR 0089 OVER SHIRLEY RUN, 26 ROME TOWNSHIP, BRIDGE REPLACEMENT 510,000 27 (BASE CONSTRUCTION ALLOCATION - 28 $420,000) 29 (LAND ALLOCATION - $20,000) 30 (DESIGN AND CONTINGENCIES - $70,000) 19970H0030B0757 - 150 -
1 (5) SR 0098, SR 0098 OVER VAN HORNE RUN, 2 VERNON TOWNSHIP, BRIDGE REPLACEMENT 320,000 3 (BASE CONSTRUCTION ALLOCATION - 4 $260,000) 5 (LAND ALLOCATION - $10,000) 6 (DESIGN AND CONTINGENCIES - $50,000) 7 (6) SR 0099, SR 0099 OVER LITTLE 8 CONNEAUTTEE CREEK, CAMBRIDGE TOWNSHIP, 9 BRIDGE REPLACEMENT 950,000 10 (BASE CONSTRUCTION ALLOCATION - 11 $700,000) 12 (LAND ALLOCATION - $50,000) 13 (DESIGN AND CONTINGENCIES - $200,000) 14 (7) SR 0099, SR 0099 OVER CONNEAUT CREEK, 15 CAMBRIDGE TOWNSHIP, BRIDGE REPLACEMENT 600,000 16 (BASE CONSTRUCTION ALLOCATION - 17 $500,000) 18 (LAND ALLOCATION - $30,000) 19 (DESIGN AND CONTINGENCIES - $70,000) 20 (8) SR 0198, SR 0198 OVER CARR RUN, 21 WOODCOCK TOWNSHIP, BRIDGE REPLACEMENT 260,000 22 (BASE CONSTRUCTION ALLOCATION - 23 $200,000) 24 (LAND ALLOCATION - $20,000) 25 (DESIGN AND CONTINGENCIES - $40,000) 26 (9) SR 0285, SR 0285 OVER BENNETT RUN, 27 NORTH SHENANGO TOWNSHIP, BRIDGE 28 REPLACEMENT 750,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $650,000) 19970H0030B0757 - 151 -
1 (LAND ALLOCATION - $20,000) 2 (DESIGN AND CONTINGENCIES - $80,000) 3 (10) SR 1002, SR 1002 OVER ACKER RUN, 4 VENANGO TOWNSHIP, BRIDGE REPLACEMENT 370,000 5 (BASE CONSTRUCTION ALLOCATION - 6 $300,000) 7 (LAND ALLOCATION - $20,000) 8 (DESIGN AND CONTINGENCIES - $50,000) 9 (11) SR 1024, SR 1024 OVER BRITTON RUN, 10 SPARTA TOWNSHIP, BRIDGE REPLACEMENT 340,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $250,000) 13 (LAND ALLOCATION - $20,000) 14 (DESIGN AND CONTINGENCIES - $70,000) 15 (12) SR 2005, SR 2005 OVER FRENCH CREEK, 16 EAST FAIRFIELD TOWNSHIP, BRIDGE 17 REPLACEMENT 1,300,000 18 (BASE CONSTRUCTION ALLOCATION - 19 $1,130,000) 20 (LAND ALLOCATION - $20,000) 21 (DESIGN AND CONTINGENCIES - $150,000) 22 (13) SR 2010, SR 2010 OVER LITTLE SUGAR 23 CREEK, WAYNE TOWNSHIP, BRIDGE 24 REPLACEMENT 260,000 25 (BASE CONSTRUCTION ALLOCATION - 26 $200,000) 27 (LAND ALLOCATION - $20,000) 28 (DESIGN AND CONTINGENCIES - $40,000) 29 (14) SR 3016, SR 3016 OVER B&LE RAILROAD, 30 SUMMIT TOWNSHIP, BRIDGE REPLACEMENT 1,150,000 19970H0030B0757 - 152 -
1 (BASE CONSTRUCTION ALLOCATION - 2 $1,000,000) 3 (LAND ALLOCATION - $30,000) 4 (DESIGN AND CONTINGENCIES - $120,000) 5 (15) SR 0018, SR 0018 BRIDGE OVER 6 TRIBUTARY OF CONNEAUT CREEK, SUMMIT 7 TOWNSHIP, BRIDGE REHABILITATION 115,000 8 (BASE CONSTRUCTION ALLOCATION - 9 $100,000) 10 (DESIGN AND CONTINGENCIES - $15,000) 11 (16) SR 0098, SR 0098 BRIDGE OVER 12 TRIBUTARY OF CUSSEWAGO CREEK, HAYFIELD 13 TOWNSHIP, BRIDGE REHABILITATION 110,000 14 (BASE CONSTRUCTION ALLOCATION - 15 $100,000) 16 (DESIGN AND CONTINGENCIES - $10,000) 17 (17) SR 2003, MERCER PIKE BRIDGE OVER 18 CONNEAUT CREEK OUTLET, UNION TOWNSHIP, 19 BRIDGE REPLACEMENT 600,000 20 (BASE CONSTRUCTION ALLOCATION - 21 $520,000) 22 (LAND ALLOCATION - $30,000) 23 (DESIGN AND CONTINGENCIES - $50,000) 24 SECTION 25. CUMBERLAND COUNTY (RESERVED). 25 SECTION 26. DAUPHIN COUNTY. 26 (A) LOCAL BRIDGES 27 (1) CITY OF HARRISBURG, MULBERRY STREET 28 RAMP TO CAMERON STREET, BRIDGE 29 REHABILITATION 108,000 30 (BASE CONSTRUCTION ALLOCATION - 19970H0030B0757 - 153 -
1 $73,000) 2 (LAND ALLOCATION - $10,000) 3 (DESIGN AND CONTINGENCIES - $ 25,000) 4 (2) CITY OF HARRISBURG, MACLAY STREET 5 BRIDGE OVER RAILROAD, BRIDGE 6 REHABILITATION 218,000 7 (BASE CONSTRUCTION ALLOCATION - 8 $183,000) 9 (LAND ALLOCATION - $10,000) 10 (DESIGN AND CONTINGENCIES - $25,000) 11 (3) MIFFLIN TOWNSHIP, T-631, REITZ ROAD 12 BRIDGE OVER LITTLE WICONISCO CREEK, 13 COUNTY BRIDGE NO.24, BRIDGE 14 REPLACEMENT 290,000 15 (BASE CONSTRUCTION ALLOCATION - 16 $200,000) 17 (LAND ALLOCATION - $10,000) 18 (DESIGN AND CONTINGENCIES - $80,000) 19 (4) MIFFLIN TOWNSHIP, T-556, KESSLER ROAD 20 BRIDGE OVER LITTLE WICONISCO CREEK, 21 BRIDGE REPLACEMENT 235,000 22 (BASE CONSTRUCTION ALLOCATION - 23 $150,000) 24 (LAND ALLOCATION - $10,000) 25 (DESIGN AND CONTINGENCIES - $75,000) 26 (5) WASHINGTON TOWNSHIP, BOLTS ROAD BRIDGE 27 OVER WICONISCO CREEK, BRIDGE 28 REHABILITATION 469,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $374,000) 19970H0030B0757 - 154 -
1 (LAND ALLOCATION - $10,000) 2 (DESIGN AND CONTINGENCIES - $85,000) 3 (6) WAYNE TOWNSHIP, T-496, LEBO ROAD 4 BRIDGE OVER POWELL CREEK, BRIDGE 5 REHABILITATION 263,000 6 (BASE CONSTRUCTION ALLOCATION - 7 $168,000) 8 (LAND ALLOCATION - $10,000) 9 (DESIGN AND CONTINGENCIES - $85,000) 10 (7) CONEWAGO TOWNSHIP, T-602 AND T-749 11 OVER CONEWAGO CREEK, BRIDGE 12 REPLACEMENT 722,000 13 (BASE CONSTRUCTION ALLOCATION - 14 $556,000) 15 (LAND ALLOCATION - $10,000) 16 (DESIGN AND CONTINGENCIES - $156,000) 17 (8) HALIFAX TOWNSHIP, T-454 OVER ARMSTRONG 18 CREEK, BRIDGE REPLACEMENT 480,000 19 (BASE CONSTRUCTION ALLOCATION - 20 $367,000) 21 (LAND ALLOCATION - $10,000) 22 (DESIGN AND CONTINGENCIES - $103,000) 23 (9) JACKSON TOWNSHIP, T-544 OVER ARMSTRONG 24 CREEK, BRIDGE REPLACEMENT 379,000 25 (BASE CONSTRUCTION ALLOCATION - 26 $288,000) 27 (LAND ALLOCATION - $10,000) 28 (DESIGN AND CONTINGENCIES - $81,000) 29 (10) JEFFERSON TOWNSHIP, T-534 OVER POWELL 30 CREEK, BRIDGE REPLACEMENT 397,000 19970H0030B0757 - 155 -
1 (BASE CONSTRUCTION ALLOCATION - 2 $302,000) 3 (LAND ALLOCATION - $10,000) 4 (DESIGN AND CONTINGENCIES - $85,000) 5 (11) UPPER PAXTON TOWNSHIP, T-460 OVER 6 WICONISCO CREEK, BRIDGE REPLACEMENT 427,000 7 (BASE CONSTRUCTION ALLOCATION - 8 $326,000) 9 (LAND ALLOCATION - $10,000) 10 (DESIGN AND CONTINGENCIES - $91,000) 11 (12) WASHINGTON TOWNSHIP, T-595 OVER 12 WICONISCO CREEK, BRIDGE REPLACEMENT 669,000 13 (BASE CONSTRUCTION ALLOCATION - 14 $515,000) 15 (LAND ALLOCATION - $10,000) 16 (DESIGN AND CONTINGENCIES - $144,000) 17 (13) WASHINGTON TOWNSHIP, T-462 OVER 18 WICONISCO CREEK, BRIDGE REPLACEMENT 668,000 19 (BASE CONSTRUCTION ALLOCATION - 20 $514,000) 21 (LAND ALLOCATION - $10,000) 22 (DESIGN AND CONTINGENCIES - $144,000) 23 (14) WAYNE TOWNSHIP, T-448 OVER POWELL 24 CREEK, BRIDGE REPLACEMENT 438,000 25 (BASE CONSTRUCTION ALLOCATION - 26 $334,000) 27 (LAND ALLOCATION (DESIGN AND 28 CONTINGENCIES - $94,000) 29 (B) STATE BRIDGES (RESERVED) 30 SECTION 27. DELAWARE COUNTY. 19970H0030B0757 - 156 -
1 (A) LOCAL BRIDGES 2 (1) CITY OF CHESTER, WEST 7TH STREET, 3 COUNTY BRIDGE NO.186 OVER CHESTER 4 CREEK, BRIDGE REPLACEMENT 1,630,000 5 (BASE CONSTRUCTION ALLOCATION - 6 $1,470,000) 7 (LAND ALLOCATION - $10,000) 8 (DESIGN AND CONTINGENCIES - $150,000) 9 (B) STATE BRIDGES 10 (1) SR 0030, PEDESTRIAN TUNNEL UNDER SR 11 0030 AND ITHAN AVENUE AT VILLANOVA 12 UNIVERSITY, RADNOR TOWNSHIP, PEDESTRIAN 13 FACILITIES 7,360,000 14 (BASE CONSTRUCTION ALLOCATION - 15 $6,500,000) 16 (LAND ALLOCATION - $650,000) 17 (DESIGN AND CONTINGENCIES - $210,000) 18 (2) SR 1015, DARBY-PAOLI ROAD BRIDGE OVER 19 BRANCH OF LITTLE DARBY CREEK, RADNOR 20 TOWNSHIP, BRIDGE REPLACEMENT 1,000,000 21 (BASE CONSTRUCTION ALLOCATION - 22 $760,000) 23 (LAND ALLOCATION - $40,000) 24 (DESIGN AND CONTINGENCIES - $200,000) 25 (3) SR 0291, 4TH STREET BRIDGE OVER RIDLEY 26 CREEK, CHESTER TOWNSHIP, BRIDGE 27 PAINTING 291,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $253,000) 30 (DESIGN AND CONTINGENCIES - $38,000) 19970H0030B0757 - 157 -
1 (4) SR 0291, ESSINGTON AVENUE BRIDGE OVER 2 DARBY CREEK, RIDLEY TOWNSHIP, BRIDGE 3 PAINTING 546,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $487,000) 6 (DESIGN AND CONTINGENCIES - $59,000) 7 (5) SR 1019, CONESTOGA ROAD BRIDGE OVER 8 PENNDOT RAILROAD RIGHT-OF-WAY, RADNOR 9 TOWNSHIP, BRIDGE REMOVAL 125,000 10 (BASE CONSTRUCTION ALLOCATION - 11 $100,000) 12 (LAND ALLOCATION - $10,000) 13 (DESIGN AND CONTINGENCIES - $15,000) 14 (6) SR 3019, ROSE VALLEY ROAD BRIDGE OVER 15 SEPTA, UPPER PROVIDENCE TOWNSHIP, 16 BRIDGE REPLACEMENT 875,000 17 (BASE CONSTRUCTION ALLOCATION - 18 $700,000) 19 (LAND ALLOCATION - $100,000) 20 (DESIGN AND CONTINGENCIES - $75,000) 21 SECTION 28. ELK COUNTY. 22 (A) LOCAL BRIDGES 23 (1) VILLAGE OF WILCOX, T-631, BRIDGE OVER 24 CLARION RIVER, BRIDGE REPLACEMENT 1,100,000 25 (BASE CONSTRUCTION ALLOCATION - 26 $850,000) 27 (LAND ALLOCATION - $50,000) 28 (DESIGN AND CONTINGENCIES - $200,000) 29 (B) STATE BRIDGES (RESERVED) 30 SECTION 29. ERIE COUNTY. 19970H0030B0757 - 158 -
1 (A) LOCAL BRIDGES 2 (1) GIRARD TOWNSHIP, BECKMAN BRIDGE OVER 3 I-90, BRIDGE PAINTING 200,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $200,000) 6 (2) MILLCREEK TOWNSHIP, T-707, ZIMMERLY 7 ROAD BRIDGE OVER I-79, NEW 2-LANE 8 BRIDGE CONSTRUCTION, NEW BRIDGE 2,150,000 9 (BASE CONSTRUCTION ALLOCATION - 10 $1,900,000) 11 (LAND ALLOCATION - $50,000) 12 (DESIGN AND CONTINGENCIES - $200,000) 13 (3) CITY OF ERIE, NORMAN WAY, BRIDGE OVER 14 MILLCREEK, BRIDGE REHABILITATION 225,000 15 (BASE CONSTRUCTION ALLOCATION - 16 $200,000) 17 (DESIGN AND CONTINGENCIES - $25,000) 18 (4) CITY OF ERIE, MCBRIDE VIADUCT-EAST 19 AVENUE, BRIDGE OVER RAILROAD LINES, 20 BRIDGE REHABILITATION 1,340,000 21 (BASE CONSTRUCTION ALLOCATION - 22 $1,300,000) 23 (DESIGN AND CONTINGENCIES - $40,000) 24 (5) CITY OF ERIE, KAHKWA BRIDGE OVER 25 RAVINE DRIVE, BRIDGE REHABILITATION 60,000 26 (BASE CONSTRUCTION ALLOCATION - 27 $50,000) 28 (DESIGN AND CONTINGENCIES - $10,000) 29 (6) GREENFIELD TOWNSHIP, T-974, OLD ROUTE 30 89 BRIDGE OVER WEST BRANCH OF FRENCH 19970H0030B0757 - 159 -
1 CREEK TRIBUTARY, BRIDGE REPLACEMENT 350,000 2 (BASE CONSTRUCTION ALLOCATION - 3 $300,000) 4 (LAND ALLOCATION - $10,000) 5 (DESIGN AND CONTINGENCIES - $40,000) 6 (7) FRANKLIN TOWNSHIP, T-424, BRIDGE NO.1 7 OVER FALK RUN, BRIDGE REPLACEMENT 350,000 8 (BASE CONSTRUCTION ALLOCATION - 9 $300,000) 10 (LAND ALLOCATION - $10,000) 11 (DESIGN AND CONTINGENCIES - $40,000) 12 (8) FRANKLIN TOWNSHIP, T-424, BRIDGE NO.2 13 OVER FALK RUN, BRIDGE REPLACEMENT 350,000 14 (BASE CONSTRUCTION ALLOCATION - 15 $300,000) 16 (LAND ALLOCATION - $10,000) 17 (DESIGN AND CONTINGENCIES - $40,000) 18 (9) FRANKLIN TOWNSHIP, T-424, FALLS ROAD 19 BRIDGE OVER FALK RUN, BRIDGE 20 REPLACEMENT 300,000 21 (BASE CONSTRUCTION ALLOCATION - 22 $250,000) 23 (LAND ALLOCATION - $10,000) 24 (DESIGN AND CONTINGENCIES - $40,000) 25 (10) MILLCREEK TOWNSHIP, T-707, ZIMMERLY 26 ROAD BRIDGE OVER I-79, TWO-LANE BRIDGE 27 CONSTRUCTION 2,150,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $1,900,000) 30 (LAND ALLOCATION - $50,000) 19970H0030B0757 - 160 -
1 (DESIGN AND CONTINGENCIES - $200,000) 2 (B) STATE BRIDGES 3 (1) SR 0005, SR 0005 OVER SCOTT RUN, 4 HARBORCREEK TOWNSHIP, BRIDGE 5 REPLACEMENT 140,000 6 (BASE CONSTRUCTION ALLOCATION - 7 $100,000) 8 (LAND ALLOCATION - $10,000) 9 (DESIGN AND CONTINGENCIES - $30,000) 10 (2) SR 0006, SR 0006 OVER FRENCH CREEK, LE 11 BOEUF TOWNSHIP, BRIDGE REPLACEMENT 700,000 12 (BASE CONSTRUCTION ALLOCATION - 13 $600,000) 14 (LAND ALLOCATION - $20,000) 15 (DESIGN AND CONTINGENCIES - $80,000) 16 (3) SR 0019, SR 0019 OVER LEBOEUF CREEK, 17 WATERFORD TOWNSHIP, BRIDGE REPLACEMENT 950,000 18 (BASE CONSTRUCTION ALLOCATION - 19 $840,000) 20 (LAND ALLOCATION - $30,000) 21 (DESIGN AND CONTINGENCIES - $80,000) 22 (4) SR 0020, SR 0020 OVER I-79, CITY OF 23 ERIE, BRIDGE REPLACEMENT 2,000,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $1,770,000) 26 (LAND ALLOCATION - $30,000) 27 (DESIGN AND CONTINGENCIES - $200,000) 28 (5) SR 0089, SR 0089 OVER SIXTEEN MILE 29 CREEK, NORTH EAST TOWNSHIP, BRIDGE 30 REPLACEMENT 490,000 19970H0030B0757 - 161 -
1 (BASE CONSTRUCTION ALLOCATION - 2 $400,000) 3 (LAND ALLOCATION - $20,000) 4 (DESIGN AND CONTINGENCIES - $70,000) 5 (6) SR 0090, SR 0090 OVER CROOKED CREEK, 6 GIRARD TOWNSHIP, BRIDGE REPLACEMENT 1,420,000 7 (BASE CONSTRUCTION ALLOCATION - 8 $1,330,000) 9 (LAND ALLOCATION - $30,000) 10 (DESIGN AND CONTINGENCIES - $60,000) 11 (7) SR 0090, SR 0090 UNDER CHERRY STREET, 12 SUMMIT TOWNSHIP, BRIDGE REPLACEMENT 1,600,000 13 (BASE CONSTRUCTION ALLOCATION - 14 $1,410,000) 15 (LAND ALLOCATION - $40,000) 16 (DESIGN AND CONTINGENCIES - $150,000) 17 (8) SR 0090, SR 0090 UNDER CLARK ROAD, 18 HARBORCREEK TOWNSHIP, BRIDGE 19 REPLACEMENT 2,100,000 20 (BASE CONSTRUCTION ALLOCATION - 21 $1,880,000) 22 (LAND ALLOCATION - $40,000) 23 (DESIGN AND CONTINGENCIES - $180,000) 24 (9) SR 0098, SR 0098 OVER CUSSEWAGO CREEK, 25 ELK CREEK TOWNSHIP, BRIDGE REPLACEMENT 400,000 26 (BASE CONSTRUCTION ALLOCATION - 27 $300,000) 28 (LAND ALLOCATION - $20,000) 29 (DESIGN AND CONTINGENCIES - $80,000) 30 (10) SR 0474, SR 0474 OVER DEAN RUN, 19970H0030B0757 - 162 -
1 VENANGO TOWNSHIP, BRIDGE REPLACEMENT 200,000 2 (BASE CONSTRUCTION ALLOCATION - 3 $160,000) 4 (LAND ALLOCATION - $10,000) 5 (DESIGN AND CONTINGENCIES - $30,000) 6 (11) SR 1001, SR 1001 OVER CONRAIL, 7 MILLCREEK TOWNSHIP, BRIDGE REPLACEMENT 720,000 8 (BASE CONSTRUCTION ALLOCATION - 9 $600,000) 10 (LAND ALLOCATION - $20,000) 11 (DESIGN AND CONTINGENCIES - $100,000) 12 (12) SR 1011, SR 1011 OVER ALDER BROOK, 13 VENANGO TOWNSHIP, BRIDGE REPLACEMENT 470,000 14 (BASE CONSTRUCTION ALLOCATION - 15 $400,000) 16 (LAND ALLOCATION - $10,000) 17 (DESIGN AND CONTINGENCIES - $60,000) 18 (13) SR 1013, SR 1013 OVER I-90, NORTH 19 EAST TOWNSHIP, BRIDGE REPLACEMENT 1,220,000 20 (BASE CONSTRUCTION ALLOCATION - 21 $1,100,000) 22 (LAND ALLOCATION - $20,000) 23 (DESIGN AND CONTINGENCIES - $100,000) 24 (14) SR 3001, SR 3001 OVER CONNEAUT CREEK, 25 CONNEAUT TOWNSHIP, BRIDGE REPLACEMENT 1,020,000 26 (BASE CONSTRUCTION ALLOCATION - 27 $900,000) 28 (LAND ALLOCATION - $20,000) 29 (DESIGN AND CONTINGENCIES - $100,000) 30 (15) SR 3003, SR 3003 OVER WEST BRANCH 19970H0030B0757 - 163 -
1 CONNEAUT CREEK, CONNEAUT TOWNSHIP, 2 BRIDGE REPLACEMENT 630,000 3 (BASE CONSTRUCTION ALLOCATION - 4 $550,000) 5 (LAND ALLOCATION - $20,000) 6 (DESIGN AND CONTINGENCIES - $60,000) 7 (16) SR 3014, SR 3014 OVER TROUT RUN, 8 WATERFORD BOROUGH, BRIDGE REPLACEMENT 370,000 9 (BASE CONSTRUCTION ALLOCATION - 10 $300,000) 11 (LAND ALLOCATION - $20,000) 12 (DESIGN AND CONTINGENCIES - $50,000) 13 (17) SR 4007, SR 4007 OVER I-90, FAIRVIEW 14 TOWNSHIP, BRIDGE REPLACEMENT 1,920,000 15 (BASE CONSTRUCTION ALLOCATION - 16 $1,800,000) 17 (LAND ALLOCATION - $20,000) 18 (DESIGN AND CONTINGENCIES - $100,000) 19 SECTION 30. FAYETTE COUNTY. 20 (A) LOCAL BRIDGES 21 (1) BROWNSVILLE TOWNSHIP, LYNN RUN ROAD 22 BRIDGE OVER REDSTONE CREEK, BRIDGE 23 REPLACEMENT 200,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $130,000) 26 (LAND ALLOCATION - $10,000) 27 (DESIGN AND CONTINGENCIES - $60,000) 28 (2) DUNBAR TOWNSHIP, FALLS AVENUE BRIDGE 29 OVER POSSUM RUN, BRIDGE REPLACEMENT 450,000 30 (BASE CONSTRUCTION ALLOCATION - 19970H0030B0757 - 164 -
1 $350,000) 2 (LAND ALLOCATION - $15,000) 3 (DESIGN AND CONTINGENCIES - $85,000) 4 (3) GEORGES TOWNSHIP, COUNTY BRIDGE NO.162 5 OVER MOUNTAIN CREEK, BRIDGE 6 REPLACEMENT 640,000 7 (BASE CONSTRUCTION ALLOCATION - 8 $425,000) 9 (LAND ALLOCATION - $40,000) 10 (DESIGN AND CONTINGENCIES - $175,000) 11 (4) GERMAN TOWNSHIP, FOOTEDALE BRIDGE 12 NO.66 OVER DUNLAP CREEK, BRIDGE 13 REPLACEMENT 498,000 14 (BASE CONSTRUCTION ALLOCATION - 15 $313,000) 16 (LAND ALLOCATION - $35,000) 17 (DESIGN AND CONTINGENCIES - $150,000) 18 (5) GERMAN TOWNSHIP, COUNTY BRIDGE NO.54 19 OVER BROWNS RUN, BRIDGE REPLACEMENT 430,000 20 (BASE CONSTRUCTION ALLOCATION - 21 $355,000) 22 (LAND ALLOCATION - $5,000) 23 (DESIGN AND CONTINGENCIES - $70,000) 24 (6) GERMAN TOWNSHIP, LECKRONE BRIDGE NO.54 25 OVER BROWNS RUN, BRIDGE REPLACEMENT 793,000 26 (BASE CONSTRUCTION ALLOCATION - 27 $563,000) 28 (LAND ALLOCATION - $50,000) 29 (DESIGN AND CONTINGENCIES - $180,000) 30 (7) MENALLEN TOWNSHIP, T-509, BRIDGE OVER 19970H0030B0757 - 165 -
1 BRANCH OF DUNLAP CREEK, BRIDGE 2 REPLACEMENT 165,000 3 (BASE CONSTRUCTION ALLOCATION - 4 $110,000) 5 (LAND ALLOCATION - $5,000) 6 (DESIGN AND CONTINGENCIES - $50,000) 7 (8) MENALLEN TOWNSHIP, FAN HALLOW ROAD 8 BRIDGE OVER FANS RUN, BRIDGE 9 REPLACEMENT 145,000 10 (BASE CONSTRUCTION ALLOCATION - 11 $90,000) 12 (LAND ALLOCATION - $5,000) 13 (DESIGN AND CONTINGENCIES - $50,000) 14 (9) MENALLEN AND NORTH UNION TOWNSHIPS, 15 FAN HOLLOW BRIDGE NO.184 OVER JENNINGS 16 RUN, BRIDGE REPLACEMENT 440,000 17 (BASE CONSTRUCTION ALLOCATION - 18 $350,000) 19 (LAND ALLOCATION - $10,000) 20 (DESIGN AND CONTINGENCIES - $80,000) 21 (10) NICHOLSON TOWNSHIP, COUNTY BRIDGE 22 NO.29 OVER YORK RUN, BRIDGE 23 REPLACEMENT 535,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $350,000) 26 (LAND ALLOCATION - $35,000) 27 (DESIGN AND CONTINGENCIES - $150,000) 28 (11) REDSTONE TOWNSHIP, MERRITTSTOWN 29 BRIDGE NO.147 OVER DUNLAP CREEK, BRIDGE 30 REPLACEMENT 435,000 19970H0030B0757 - 166 -
1 (BASE CONSTRUCTION ALLOCATION - 2 $350,000) 3 (LAND ALLOCATION - $10,000) 4 (DESIGN AND CONTINGENCIES - $75,000) 5 (12) SOUTH UNION TOWNSHIP, T-479, LEITH 6 BRIDGE NO.41 OVER REDSTONE CREEK, 7 BRIDGE REPLACEMENT 690,000 8 (BASE CONSTRUCTION ALLOCATION - 9 $475,000) 10 (LAND ALLOCATION - $40,000) 11 (DESIGN AND CONTINGENCIES - $175,000) 12 (13) STEWARD TOWNSHIP, T-798, MEADOW RUN 13 BRIDGE NO.82 OVER MEADOW RUN, BRIDGE 14 REPLACEMENT 825,000 15 (BASE CONSTRUCTION ALLOCATION - 16 $575,000) 17 (LAND ALLOCATION - $55,000) 18 (DESIGN AND CONTINGENCIES - $195,000) 19 (14) SPRINGHILL TOWNSHIP, T-335, COUNTY 20 BRIDGE NO.92 OVER YORK RUN, BRIDGE 21 REPLACEMENT 1,438,000 22 (BASE CONSTRUCTION ALLOCATION - 23 $1,113,000) 24 (LAND ALLOCATION - $75,000) 25 (DESIGN AND CONTINGENCIES - $250,000) 26 (15) SPRINGFIELD TOWNSHIP, T-593, COUNTY 27 BRIDGE NO.111 OVER MILL RUN, BRIDGE 28 REPLACEMENT 320,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $225,000) 19970H0030B0757 - 167 -
1 (LAND ALLOCATION - $20,000) 2 (DESIGN AND CONTINGENCIES - $75,000) 3 (16) NORTH UNION TOWNSHIP, T-535 OVER 4 REDSTONE CREEK, BRIDGE REPLACEMENT 825,000 5 (BASE CONSTRUCTION ALLOCATION - 6 $625,000) 7 (LAND ALLOCATION - $25,000) 8 (DESIGN AND CONTINGENCIES - $175,000) 9 (17) NORTH UNION TOWNSHIP, T-557 OVER 10 REDSTONE CREEK, BRIDGE REPLACEMENT 450,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $275,000) 13 (LAND ALLOCATION - $50,000) 14 (DESIGN AND CONTINGENCIES - $125,000) 15 (18) GEORGES TOWNSHIP, T-387, COUNTY 16 BRIDGE NO.102 OVER YORK RUN, BRIDGE 17 REHABILITATION 320,000 18 (BASE CONSTRUCTION ALLOCATION - 19 $225,000) 20 (LAND ALLOCATION - $20,000) 21 (DESIGN AND CONTINGENCIES - $75,000) 22 (19) SOUTH UNION TOWNSHIP, T-459, TOWNSHIP 23 BRIDGE NO.1 OVER LICK RUN, BRIDGE 24 REPLACEMENT 280,000 25 (BASE CONSTRUCTION ALLOCATION - 26 $175,000) 27 (LAND ALLOCATION - $25,000) 28 (DESIGN AND CONTINGENCIES - $80,000) 29 (20) STEWART TOWNSHIP, T-415, COUNTY 30 BRIDGE NO.63 OVER MEADOW RUN, BRIDGE 19970H0030B0757 - 168 -
1 REPLACEMENT 1,005,000 2 (BASE CONSTRUCTION ALLOCATION - 3 $775,000) 4 (LAND ALLOCATION - $50,000) 5 (DESIGN AND CONTINGENCIES - $180,000) 6 (21) GERMAN TOWNSHIP, COUNTY BRIDGE NO.54 7 OVER BROWNS RUN AT LEITH COMMUNITY, 8 BRIDGE REPLACEMENT 430,000 9 (BASE CONSTRUCTION ALLOCATION - 10 $350,000) 11 (LAND ALLOCATION - $5,000) 12 (DESIGN AND CONTINGENCIES - $75,000) 13 (B) STATE BRIDGES 14 (1) SR 0021, MASONTOWN BRIDGE OVER 15 MONONGAHELA RIVER, RAILROAD AND PRIVATE 16 ROAD, GERMAN TOWNSHIP, BRIDGE PAINTING 1,500,000 17 (BASE CONSTRUCTION ALLOCATION - 18 $1,500,000) 19 (2) SR 0031, JACOBS CREEK BRIDGE OVER 20 BRANCH OF JACOBS CREEK, BULLSKIN 21 TOWNSHIP, BRIDGE REPLACEMENT 290,000 22 (BASE CONSTRUCTION ALLOCATION - 23 $180,000) 24 (LAND ALLOCATION - $35,000) 25 (DESIGN AND CONTINGENCIES - $75,000) 26 (3) SR 0119, MEMORIAL BRIDGE OVER 27 YOUGHIOGHENY RIVER, CONNELLSVILLE 28 BOROUGH, BRIDGE PAINTING 100,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $100,000) 19970H0030B0757 - 169 -
1 (4) SR 0201, FURNACE RUN BRIDGE OVER 2 FURNACE RUN, FRANKLIN TOWNSHIP, BRIDGE 3 REPLACEMENT 445,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $245,000) 6 (LAND ALLOCATION - $25,000) 7 (DESIGN AND CONTINGENCIES - $175,000) 8 (5) SR 0711, CRAWFORD AVENUE BRIDGE OVER 9 YOUGHIOGHENY RIVER, CONNELLSVILLE 10 BOROUGH, BRIDGE PAINTING 100,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $100,000) 13 (6) SR 0982, JACOBS CREEK BRIDGE OVER 14 BRANCH OF JACOBS CREEK, BULLSKIN 15 TOWNSHIP, BRIDGE REPLACEMENT 335,000 16 (BASE CONSTRUCTION ALLOCATION - 17 $225,000) 18 (LAND ALLOCATION - $35,000) 19 (DESIGN AND CONTINGENCIES - $75,000) 20 (7) SR 0982, BRIDGE OVER MOUNTS CREEK, 21 BULLSKIN TOWNSHIP, BRIDGE PAINTING 105,000 22 (BASE CONSTRUCTION ALLOCATION - 23 $105,000) 24 (8) SR 1051, MOUNTS CREEK BRIDGE OVER 25 MOUNTS CREEK, BULLSKIN TOWNSHIP, BRIDGE 26 REPLACEMENT 436,000 27 (BASE CONSTRUCTION ALLOCATION - 28 $236,000) 29 (LAND ALLOCATION - $25,000) 30 (DESIGN AND CONTINGENCIES - $175,000) 19970H0030B0757 - 170 -
1 (9) SR 3013, BROWNS RUN BRIDGE OVER BROWNS 2 RUN, GERMAN TOWNSHIP, BRIDGE 3 REPLACEMENT 631,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $431,000) 6 (LAND ALLOCATION - $25,000) 7 (DESIGN AND CONTINGENCIES - $175,000) 8 (10) SR 3015, MUDDY RUN BRIDGE OVER MUDDY 9 RUN, GEORGES TOWNSHIP, BRIDGE PAINTING 33,000 10 (BASE CONSTRUCTION ALLOCATION - 11 $33,000) 12 (11) SR 4038, WASHINGTON RUN BRIDGE OVER 13 WASHINGTON RUN, PERRY TOWNSHIP, BRIDGE 14 REPLACEMENT 640,000 15 (BASE CONSTRUCTION ALLOCATION - 16 $440,000) 17 (LAND ALLOCATION - $25,000) 18 (DESIGN AND CONTINGENCIES - $175,000) 19 (12) SR 0381, SR 0381 OVER STONEY RUN, 20 WHARTON TOWNSHIP, BRIDGE REPLACEMENT 663,000 21 (BASE CONSTRUCTION ALLOCATION - 22 $463,000) 23 (LAND ALLOCATION - $50,000) 24 (DESIGN AND CONTINGENCIES - $150,000) 25 (13) SR 0819, SR 0819 OVER BRANCH OF 26 JACOBS CREEK, LOWER TYRONE TOWNSHIP, 27 BRIDGE REPLACEMENT 240,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $125,000) 30 (LAND ALLOCATION - $15,000) 19970H0030B0757 - 171 -
1 (DESIGN AND CONTINGENCIES - $100,000) 2 (14) SR 1021, SR 1021 OVER BREAKNECK RUN, 3 BULLSKIN TOWNSHIP, BRIDGE REPLACEMENT 650,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $475,000) 6 (LAND ALLOCATION - $50,000) 7 (DESIGN AND CONTINGENCIES - $125,000) 8 (15) SR 1031, SR 1031 OVER GALLEY RUN, 9 UPPER TYRONE TOWNSHIP, BRIDGE 10 REPLACEMENT 475,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $325,000) 13 (LAND ALLOCATION - $25,000) 14 (DESIGN AND CONTINGENCIES - $125,000) 15 (16) SR 1031, SR 1031 OVER BRANCH OF 16 GALLEY RUN, UPPER TYRONE TOWNSHIP, 17 BRIDGE REPLACEMENT 613,000 18 (BASE CONSTRUCTION ALLOCATION - 19 $413,000) 20 (LAND ALLOCATION - $50,000) 21 (DESIGN AND CONTINGENCIES - $150,000) 22 (17) SR 1044, SR 1044 OVER BRANCH OF 23 MOUNTS CREEK, BULLSKIN TOWNSHIP, BRIDGE 24 REPLACEMENT 350,000 25 (BASE CONSTRUCTION ALLOCATION - 26 $200,000) 27 (LAND ALLOCATION - $25,000) 28 (DESIGN AND CONTINGENCIES - $125,000) 29 (18) SR 2003, SR 2003 OVER CHANEY RUN, 30 WHARTON TOWNSHIP, BRIDGE REPLACEMENT 290,000 19970H0030B0757 - 172 -
1 (BASE CONSTRUCTION ALLOCATION - 2 $175,000) 3 (LAND ALLOCATION - $15,000) 4 (DESIGN AND CONTINGENCIES - $100,000) 5 (19) SR 3003, SR 3003 AT NICHOLSON 6 TOWNSHIP BORDER, SPRINGHILL TOWNSHIP, 7 BRIDGE REPLACEMENT 1,400,000 8 (BASE CONSTRUCTION ALLOCATION - 9 $1,125,000) 10 (LAND ALLOCATION - $75,000) 11 (DESIGN AND CONTINGENCIES - $200,000) 12 (20) SR 3003, SR 3003 OVER GEORGES CREEK, 13 SPRINGHILL TOWNSHIP, BRIDGE 14 REPLACEMENT 1,450,000 15 (BASE CONSTRUCTION ALLOCATION - 16 $1,150,000) 17 (LAND ALLOCATION - $75,000) 18 (DESIGN AND CONTINGENCIES - $225,000) 19 (21) SR 3003, SR 3003 NICHOLSON TOWNSHIP 20 OVER GEORGES CREEK, SPRINGHILL 21 TOWNSHIP, BRIDGE REPLACEMENT 1,200,000 22 (BASE CONSTRUCTION ALLOCATION - 23 $975,000) 24 (LAND ALLOCATION - $50,000) 25 (DESIGN AND CONTINGENCIES - $175,000) 26 (22) SR 3009, SR 3009 OVER GEORGES CREEK, 27 SPRINGHILL TOWNSHIP, BRIDGE 28 REPLACEMENT 863,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $688,000) 19970H0030B0757 - 173 -
1 (LAND ALLOCATION - $25,000) 2 (DESIGN AND CONTINGENCIES - $150,000) 3 (23) SR 3013, SR 3013 OVER MIDDLE RUN, 4 GERMAN TOWNSHIP, BRIDGE REPLACEMENT 900,000 5 (BASE CONSTRUCTION ALLOCATION - 6 $650,000) 7 (LAND ALLOCATION - $75,000) 8 (DESIGN AND CONTINGENCIES - $175,000) 9 (24) SR 4027, SR 4027 OVER LITTLE REDSTONE 10 CREEK, JEFFERSON TOWNSHIP, BRIDGE 11 REPLACEMENT 538,000 12 (BASE CONSTRUCTION ALLOCATION - 13 $338,000) 14 (LAND ALLOCATION - $50,000) 15 (DESIGN AND CONTINGENCIES - $150,000) 16 (25) SR 4044, SR 4044 OVER DOWNERS RUN, 17 WASHINGTON TOWNSHIP, BRIDGE 18 REPLACEMENT 800,000 19 (BASE CONSTRUCTION ALLOCATION - 20 $575,000) 21 (LAND ALLOCATION - $50,000) 22 (DESIGN AND CONTINGENCIES - $175,000) 23 (26) SR 4046, SR 4046 OVER LUTZ RUN AND 24 ABANDONED RAILROAD, WASHINGTON 25 TOWNSHIP, BRIDGE REPLACEMENT 1,400,000 26 (BASE CONSTRUCTION ALLOCATION - 27 $1,075,000) 28 (LAND ALLOCATION - $75,000) 29 (DESIGN AND CONTINGENCIES - $250,000) 30 (27) SR 0031, JACOBS CREEK BRIDGE OVER 19970H0030B0757 - 174 -
1 JACOBS CREEK, BULLSKIN TOWNSHIP, 2 FAYETTE COUNTY, AND MT. PLEASANT 3 TOWNSHIP, WESTMORELAND COUNTY, BRIDGE 4 REPLACEMENT 715,000 5 (BASE CONSTRUCTION ALLOCATION - 6 $500,000) 7 (LAND ALLOCATION - $40,000) 8 (DESIGN AND CONTINGENCIES - $175,000) 9 SECTION 31. FOREST COUNTY. 10 (A) LOCAL BRIDGES (RESERVED) 11 (B) STATE BRIDGES 12 (1) SR 0227, SR 0227 OVER WEST HICKORY 13 CREEK, HARMONY TOWNSHIP, BRIDGE 14 REPLACEMENT 480,000 15 (BASE CONSTRUCTION ALLOCATION - 16 $400,000) 17 (LAND ALLOCATION - $20,000) 18 (DESIGN AND CONTINGENCIES - $60,000) 19 (2) SR 3001, SR 3001 OVER LITTLE TIONESTA 20 CREEK, TIONESTA TOWNSHIP, BRIDGE 21 REPLACEMENT 400,000 22 (BASE CONSTRUCTION ALLOCATION - 23 $310,000) 24 (LAND ALLOCATION - $10,000) 25 (DESIGN AND CONTINGENCIES - $80,000) 26 (3) SR 3004, SR 3004 OVER LITTLE HICKORY 27 CREEK, HICKORY TOWNSHIP, BRIDGE 28 REPLACEMENT 390,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $300,000) 19970H0030B0757 - 175 -
1 (LAND ALLOCATION - $30,000) 2 (DESIGN AND CONTINGENCIES - $60,000) 3 (4) SR 3004, SR 3004 OVER PINEY RUN, GREEN 4 TOWNSHIP, BRIDGE REPLACEMENT 390,000 5 (BASE CONSTRUCTION ALLOCATION - 6 $300,000) 7 (LAND ALLOCATION - $10,000) 8 (DESIGN AND CONTINGENCIES - $80,000) 9 (5) SR 3001, RED BRUSH ROAD BRIDGE OVER 10 LITTLE TIONESTA CREEK, TIONESTA 11 TOWNSHIP, BRIDGE REHABILITATION 605,000 12 (BASE CONSTRUCTION ALLOCATION - 13 $550,000) 14 (DESIGN AND CONTINGENCIES - $55,000) 15 SECTION 32. FRANKLIN COUNTY. 16 (A) LOCAL BRIDGES (RESERVED) 17 (B) STATE BRIDGES 18 (1) SR 3012, SOCIAL ISLAND ROAD BRIDGE 19 OVER CONOCOCHEAGUE CREEK, HAMILTON 20 TOWNSHIP, BRIDGE REPLACEMENT 786,000 21 (BASE CONSTRUCTION ALLOCATION - 22 $636,000) 23 (LAND ALLOCATION - $95,000) 24 (DESIGN AND CONTINGENCIES - $55,000) 25 (2) SR 4010, EDENVILLE ROAD BRIDGE OVER 26 WILSON RUN, ST. THOMAS TOWNSHIP, BRIDGE 27 REPLACEMENT 335,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $225,000) 30 (LAND ALLOCATION - $10,000) 19970H0030B0757 - 176 -
1 (DESIGN AND CONTINGENCIES - $100,000) 2 (3) SR 4009, OVER WILSON RUN, ST. THOMAS 3 TOWNSHIP, BRIDGE REPLACEMENT 750,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $500,000) 6 (LAND ALLOCATION - $50,000) 7 (DESIGN AND CONTINGENCIES - $200,000) 8 SECTION 33. FULTON COUNTY (RESERVED). 9 SECTION 34. GREENE COUNTY. 10 (A) LOCAL BRIDGES 11 (1) MORGAN TOWNSHIP, COUNTY BRIDGE NO.89 12 OVER BROWNS RUN, BRIDGE REPLACEMENT 286,000 13 (BASE CONSTRUCTION ALLOCATION - 14 $166,000) 15 (LAND ALLOCATION - $20,000) 16 (DESIGN AND CONTINGENCIES - $100,000) 17 (2) MORGAN TOWNSHIP, COUNTY BRIDGE NO.90 18 OVER BROWNS RUN, BRIDGE REPLACEMENT 282,000 19 (BASE CONSTRUCTION ALLOCATION - 20 $162,000) 21 (LAND ALLOCATION - $20,000) 22 (DESIGN AND CONTINGENCIES - $100,000) 23 (3) MORGAN TOWNSHIP, COUNTY BRIDGE NO.91 24 OVER BROWNS RUN, BRIDGE REPLACEMENT 273,000 25 (BASE CONSTRUCTION ALLOCATION - 26 $153,000) 27 (LAND ALLOCATION - $20,000) 28 (DESIGN AND CONTINGENCIES - $100,000) 29 (4) CUMBERLAND TOWNSHIP, T-517, COUNTY 30 BRIDGE NO.4, ULLERY ROAD OVER GOOSE 19970H0030B0757 - 177 -
1 RUN, BRIDGE REPLACEMENT 360,000 2 (BASE CONSTRUCTION ALLOCATION - 3 $200,000) 4 (LAND ALLOCATION - $10,000) 5 (DESIGN AND CONTINGENCIES - $150,000) 6 (5) CUMBERLAND TOWNSHIP, T-634, COUNTY 7 BRIDGE NO.15, COAL HILL ROAD OVER MUDDY 8 CREEK, BRIDGE REPLACEMENT 410,000 9 (BASE CONSTRUCTION ALLOCATION - 10 $240,000) 11 (LAND ALLOCATION - $10,000) 12 (DESIGN AND CONTINGENCIES - $160,000) 13 (6) GREENE TOWNSHIP, T-411, COUNTY BRIDGE 14 NO.20 OVER WHITELY CREEK, BRIDGE 15 REPLACEMENT 1,075,000 16 (BASE CONSTRUCTION ALLOCATION - 17 $900,000) 18 (LAND ALLOCATION - $25,000) 19 (DESIGN AND CONTINGENCIES - $150,000) 20 (7) GRAY TOWNSHIP, T-392, COUNTY BRIDGE 21 NO.63 OVER GRAYS CREEK, BRIDGE 22 REPLACEMENT 380,000 23 (BASE CONSTRUCTION ALLOCATION - 24 $220,000) 25 (LAND ALLOCATION - $10,000) 26 (DESIGN AND CONTINGENCIES - $150,000) 27 (8) WASHINGTON TOWNSHIP, T-550, COUNTY 28 BRIDGE NO.97 OVER CRAYNES RUN, BRIDGE 29 REPLACEMENT 360,000 30 (BASE CONSTRUCTION ALLOCATION - 19970H0030B0757 - 178 -
1 $200,000) 2 (LAND ALLOCATION - $10,000) 3 (DESIGN AND CONTINGENCIES - $150,000) 4 (9) MORRIS TOWNSHIP, T-629, COUNTY BRIDGE 5 NO.73 OVER BATES FORK CREEK, BRIDGE 6 REPLACEMENT 490,000 7 (BASE CONSTRUCTION ALLOCATION - 8 $350,000) 9 (LAND ALLOCATION - $15,000) 10 (DESIGN AND CONTINGENCIES - $125,000) 11 (10) CUMBERLAND TOWNSHIP, T-660, COUNTY 12 BRIDGE NO.13 OVER MUDDY CREEK, BRIDGE 13 REPLACEMENT 565,000 14 (BASE CONSTRUCTION ALLOCATION - 15 $400,000) 16 (LAND ALLOCATION - 15,000) 17 (DESIGN AND CONTINGENCIES - $150,000) 18 (11) ALEPPO TOWNSHIP, T-304, COUNTY BRIDGE 19 NO.108 OVER BRANCH OF HARTS RUN, BRIDGE 20 REPLACEMENT 575,000 21 (BASE CONSTRUCTION ALLOCATION - 22 $425,000) 23 (LAND ALLOCATION - $25,000) 24 (DESIGN AND CONTINGENCIES - $125,000) 25 (12) FRANKLIN TOWNSHIP, T-511, BRIDGE 26 NO.30 OVER SMITH CREEK, BRIDGE 27 REPLACEMENT 625,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $475,000) 30 (LAND ALLOCATION - $25,000) 19970H0030B0757 - 179 -
1 (DESIGN AND CONTINGENCIES - $125,000) 2 (13) MORGAN TOWNSHIP, T-659, BRIDGE NO.87 3 OVER TEN MILE CREEK, BRIDGE 4 REPLACEMENT 1,275,000 5 (BASE CONSTRUCTION ALLOCATION - 6 $1,100,000) 7 (LAND ALLOCATION - $25,000) 8 (DESIGN AND CONTINGENCIES - $150,000) 9 (14) RICHHILL TOWNSHIP, T-356, BRIDGE 10 NO.57 OVER NORTH FORK OF WHEELING 11 CREEK, BRIDGE REPLACEMENT 765,000 12 (BASE CONSTRUCTION ALLOCATION - 13 $625,000) 14 (LAND ALLOCATION - $15,000) 15 (DESIGN AND CONTINGENCIES - $125,000) 16 (15) JACKSON TOWNSHIP, T-381, BRIDGE 17 NO.109 OVER JOB CREEK, BRIDGE 18 REPLACEMENT 465,000 19 (BASE CONSTRUCTION ALLOCATION - 20 $325,000) 21 (LAND ALLOCATION - $15,000) 22 (DESIGN AND CONTINGENCIES - $125,000) 23 (B) STATE BRIDGES 24 (1) SR 0018, BRIDGE OVER SOUTH FORK OF TEN 25 MILE CREEK, FRANKLIN TOWNSHIP, BRIDGE 26 REHABILITATION 320,000 27 (BASE CONSTRUCTION ALLOCATION - 28 $280,000) 29 (DESIGN AND CONTINGENCIES - $40,000) 30 (2) SR 0018, BATES CREEK BRIDGE OVER BATES 19970H0030B0757 - 180 -
1 FORK AND BROWNS CREEKS, WASHINGTON 2 TOWNSHIP, BRIDGE REPLACEMENT 650,000 3 (BASE CONSTRUCTION ALLOCATION - 4 $450,000) 5 (LAND ALLOCATION - $25,000) 6 (DESIGN AND CONTINGENCIES - $175,000) 7 (3) SR 0021, GRINNAGE RUN BRIDGE OVER 8 GRINNAGE RUN, GRAY TOWNSHIP, BRIDGE 9 REPLACEMENT 453,000 10 (BASE CONSTRUCTION ALLOCATION - 11 $253,000) 12 (LAND ALLOCATION - $25,000) 13 (DESIGN AND CONTINGENCIES - $175,000) 14 (4) SR 0079, I-79 BRIDGE OVER T-631, 15 WASHINGTON TOWNSHIP, BRIDGE 16 REPLACEMENT 980,000 17 (BASE CONSTRUCTION ALLOCATION - 18 $740,000) 19 (LAND ALLOCATION - $40,000) 20 (DESIGN AND CONTINGENCIES - $200,000) 21 (5) SR 0079, I-79 BRIDGE OVER T-631, 22 WASHINGTON TOWNSHIP, BRIDGE 23 REHABILITATION 945,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $705,000) 26 (LAND ALLOCATION - $40,000) 27 (DESIGN AND CONTINGENCIES - $200,000) 28 (6) SR 0079, I-79 BRIDGE OVER PA 221, 29 WASHINGTON TOWNSHIP, BRIDGE 30 REPLACEMENT 2,074,000 19970H0030B0757 - 181 -
1 (BASE CONSTRUCTION ALLOCATION - 2 $1,784,000) 3 (LAND ALLOCATION - $40,000) 4 (DESIGN AND CONTINGENCIES - $250,000) 5 (7) SR 0079, I-79 BRIDGE NO.2 OVER PA 221, 6 WASHINGTON TOWNSHIP, BRIDGE 7 REPLACEMENT 2,074,000 8 (BASE CONSTRUCTION ALLOCATION - 9 $1,784,000) 10 (LAND ALLOCATION - $40,000) 11 (DESIGN AND CONTINGENCIES - $250,000) 12 (8) SR 0079, I-79 BRIDGE OVER T-512, 13 WASHINGTON TOWNSHIP, BRIDGE 14 REHABILITATION 980,000 15 (BASE CONSTRUCTION ALLOCATION - 16 $740,000) 17 (LAND ALLOCATION - $40,000) 18 (DESIGN AND CONTINGENCIES - $200,000) 19 (9) SR 0079, I-79 BRIDGE NO.2 OVER T-512, 20 WASHINGTON TOWNSHIP, BRIDGE 21 REPLACEMENT 1,020,000 22 (BASE CONSTRUCTION ALLOCATION - 23 $780,000) 24 (LAND ALLOCATION - $40,000) 25 (DESIGN AND CONTINGENCIES - $200,000) 26 (10) SR 0088, ALBERT GALLATIN BRIDGE OVER 27 MONONGAHELA RIVER, DUNKARD TOWNSHIP, 28 BRIDGE PAINTING 1,500,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $1,500,000) 19970H0030B0757 - 182 -
1 (11) SR 0088, POINT MARION BRIDGE OVER 2 MONONGAHELA RIVER, DUNKARD TOWNSHIP, 3 BRIDGE REPLACEMENT 6,200,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $5,500,000) 6 (LAND ALLOCATION - $200,000) 7 (DESIGN AND CONTINGENCIES - $500,000) 8 (12) SR 0218, ROBERTS RUN BRIDGE NO.2 OVER 9 ROBERTS RUN, WAYNE TOWNSHIP, BRIDGE 10 REPLACEMENT 768,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $568,000) 13 (LAND ALLOCATION - $25,000) 14 (DESIGN AND CONTINGENCIES - $175,000) 15 (13) SR 2003, BRIDGE OVER BRANCH OF 16 DUNKARD CREEK, PERRY TOWNSHIP, BRIDGE 17 REPLACEMENT 625,000 18 (BASE CONSTRUCTION ALLOCATION - 19 $400,000) 20 (LAND ALLOCATION - $25,000) 21 (DESIGN AND CONTINGENCIES - $200,000) 22 (14) SR 3007, BRIDGE OVER BRANCH OF 23 WHEELING CREEK, RICHILL TOWNSHIP, 24 BRIDGE REPLACEMENT 375,000 25 (BASE CONSTRUCTION ALLOCATION - 26 $175,000) 27 (LAND ALLOCATION - $25,000) 28 (DESIGN AND CONTINGENCIES - $175,000) 29 SECTION 35. HUNTINGDON COUNTY. 30 (A) LOCAL BRIDGES 19970H0030B0757 - 183 -
1 (1) MILL CREEK BOROUGH, MAIN STREET BRIDGE 2 OVER MILL CREEK, BRIDGE REHABILITATION 30,000 3 (BASE CONSTRUCTION ALLOCATION - 4 $30,000) 5 (2) JUNIATA TOWNSHIP, T-428, CORBIN BRIDGE 6 OVER RAYSTOWN BRANCH OF JUNIATA RIVER, 7 BRIDGE REPLACEMENT 920,000 8 (BASE CONSTRUCTION ALLOCATION - 9 $920,000) 10 (3) SPRINGFIELD TOWNSHIP, T-313, WALNUT 11 GROVE BRIDGE, COUNTY BRIDGE NO.2 OVER 12 SIDELING HILL CREEK, BRIDGE 13 REPLACEMENT 975,000 14 (BASE CONSTRUCTION ALLOCATION - 15 $800,000) 16 (LAND ALLOCATION - $25,000) 17 (DESIGN AND CONTINGENCIES - $150,000) 18 (B) STATE BRIDGES (RESERVED) 19 SECTION 36. INDIANA COUNTY. 20 (A) LOCAL BRIDGES 21 (1) BANKS TOWNSHIP, T-974, COUNTY BRIDGE 22 NO.13, BEAR RUN BRIDGE OVER BEAR RUN, 23 BRIDGE REPLACEMENT 500,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $400,000) 26 (LAND ALLOCATION - $20,000) 27 (DESIGN AND CONTINGENCIES - $80,000) 28 (2) BLACKLICK TOWNSHIP, T-574, MUDDY RUN 29 BRIDGE OVER MUDDY RUN, BRIDGE 30 REPLACEMENT 380,000 19970H0030B0757 - 184 -
1 (BASE CONSTRUCTION ALLOCATION - 2 $300,000) 3 (LAND ALLOCATION - $10,000) 4 (DESIGN AND CONTINGENCIES - $70,000) 5 (3) CHERRYHILL TOWNSHIP, T-686, COUNTY 6 BRIDGE NO.65, GRACE CHURCH BRIDGE OVER 7 TWO LICK CREEK, BRIDGE REPLACEMENT 600,000 8 (BASE CONSTRUCTION ALLOCATION - 9 $500,000) 10 (LAND ALLOCATION - $20,000) 11 (DESIGN AND CONTINGENCIES - $80,000) 12 (4) CHERRYHILL TOWNSHIP, T-978, ALLEN 13 BRIDGE OVER TWO LICK RESERVOIR, BRIDGE 14 REHABILITATION 264,000 15 (BASE CONSTRUCTION ALLOCATION - 16 $200,000) 17 (LAND ALLOCATION - $10,000) 18 (DESIGN AND CONTINGENCIES - $54,000) 19 (5) RAYNE TOWNSHIP, T-760, COUNTY BRIDGE 20 NO.23-A, CHAMBERSVILLE BRIDGE OVER 21 CROOKED CREEK, BRIDGE REHABILITATION 190,000 22 (BASE CONSTRUCTION ALLOCATION - 23 $150,000) 24 (LAND ALLOCATION - $10,000) 25 (DESIGN AND CONTINGENCIES - $30,000) 26 (6) GRANT TOWNSHIP, T-820 OVER CROOKED 27 RUN, BRIDGE REPLACEMENT 245,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $200,000) 30 (LAND ALLOCATION - $10,000) 19970H0030B0757 - 185 -
1 (DESIGN AND CONTINGENCIES - $35,000) 2 (B) STATE BRIDGES 3 (1) SR 0022, CHESTNUT RIDGE BRIDGE OVER SR 4 0119, BURRELL TOWNSHIP, BRIDGE 5 PAINTING 90,000 6 (BASE CONSTRUCTION ALLOCATION - 7 $75,000) 8 (DESIGN AND CONTINGENCIES - $15,000) 9 (2) SR 0022, ARMAGH BRIDGE OVER SR 0056, 10 WEST WHEATFIELD TOWNSHIP, BRIDGE 11 PAINTING 145,000 12 (BASE CONSTRUCTION ALLOCATION - 13 $130,000) 14 (DESIGN AND CONTINGENCIES - $15,000) 15 (3) SR 0119, BLACKLICK BRIDGE OVER 16 BLACKLICK CREEK, BURRELL TOWNSHIP, 17 BRIDGE PAINTING 280,000 18 (BASE CONSTRUCTION ALLOCATION - 19 $265,000) 20 (DESIGN AND CONTINGENCIES - $15,000) 21 (4) SR 0119, BYPASS STEEL BRIDGE NO.1 OVER 22 WAYNE AVENUE RAMPS, WHITE TOWNSHIP, 23 BRIDGE PAINTING 170,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $155,000) 26 (DESIGN AND CONTINGENCIES - $15,000) 27 (5) SR 0119, BYPASS STEEL BRIDGE NO.2 OVER 28 WAYNE AVENUE RAMPS, WHITE TOWNSHIP, 29 BRIDGE PAINTING 170,000 30 (BASE CONSTRUCTION ALLOCATION - 19970H0030B0757 - 186 -
1 $155,000) 2 (DESIGN AND CONTINGENCIES - $15,000) 3 (6) SR 0119, BYPASS STEEL BRIDGE NO.3 OVER 4 SR 0422, WHITE TOWNSHIP, BRIDGE 5 PAINTING 240,000 6 (BASE CONSTRUCTION ALLOCATION - 7 $225,000) 8 (DESIGN AND CONTINGENCIES - $15,000) 9 (7) SR 0119, BYPASS STEEL BRIDGE NO.4 OVER 10 SR 0422, WHITE TOWNSHIP, BRIDGE 11 PAINTING 240,000 12 (BASE CONSTRUCTION ALLOCATION - 13 $225,000) 14 (DESIGN AND CONTINGENCIES - $15,000) 15 (8) SR 0119, BYPASS STEEL BRIDGE NO.5 OVER 16 SR 0954, WHITE TOWNSHIP, BRIDGE 17 PAINTING 195,000 18 (BASE CONSTRUCTION ALLOCATION - 19 $180,000) 20 (DESIGN AND CONTINGENCIES - $15,000) 21 (9) SR 0119, BYPASS STEEL BRIDGE NO.6 OVER 22 SR 0954, WHITE TOWNSHIP, BRIDGE 23 PAINTING 175,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $160,000) 26 (DESIGN AND CONTINGENCIES - $15,000) 27 (10) SR 0119, BYPASS STEEL BRIDGE NO.7 28 OVER SR 0286, WHITE TOWNSHIP, BRIDGE 29 PAINTING 235,000 30 (BASE CONSTRUCTION ALLOCATION - 19970H0030B0757 - 187 -
1 $220,000) 2 (DESIGN AND CONTINGENCIES - $15,000) 3 (11) SR 0119, BYPASS STEEL BRIDGE NO.8 4 OVER SR 0286, WHITE TOWNSHIP, BRIDGE 5 PAINTING 215,000 6 (BASE CONSTRUCTION ALLOCATION - 7 $200,000) 8 (DESIGN AND CONTINGENCIES - $15,000) 9 (12) SR 0119, BYPASS STEEL BRIDGE NO.9 10 OVER SR 1003, WHITE TOWNSHIP, BRIDGE 11 PAINTING 200,000 12 (BASE CONSTRUCTION ALLOCATION - 13 $185,000) 14 (DESIGN AND CONTINGENCIES - $15,000) 15 (13) SR 0119, BYPASS STEEL BRIDGE NO.10 16 OVER SR 1003, WHITE TOWNSHIP, BRIDGE 17 PAINTING 175,000 18 (BASE CONSTRUCTION ALLOCATION - 19 $160,000) 20 (DESIGN AND CONTINGENCIES - $15,000) 21 (14) SR 0119, BYPASS STEEL BRIDGE NO.11 22 OVER SR 0110, WHITE TOWNSHIP, BRIDGE 23 PAINTING 125,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $110,000) 26 (DESIGN AND CONTINGENCIES - $15,000) 27 (15) SR 0119, BYPASS STEEL BRIDGE NO.12 28 OVER SR 0110, WHITE TOWNSHIP, BRIDGE 29 PAINTING 125,000 30 (BASE CONSTRUCTION ALLOCATION - 19970H0030B0757 - 188 -
1 $110,000) 2 (DESIGN AND CONTINGENCIES - $15,000) 3 (16) SR 0217, TORRANCE BRIDGE OVER 4 CONEMAUGH RIVER, BURRELL TOWNSHIP, 5 BRIDGE PAINTING 435,000 6 (BASE CONSTRUCTION ALLOCATION - 7 $420,000) 8 (DESIGN AND CONTINGENCIES - $15,000) 9 (17) SR 0217, BLACKLICK CREEK BRIDGE OVER 10 BLACKLICK CREEK, BURRELL TOWNSHIP, 11 BRIDGE PAINTING 400,000 12 (BASE CONSTRUCTION ALLOCATION - 13 $385,000) 14 (DESIGN AND CONTINGENCIES - $15,000) 15 (18) SR 0259, HESHBON BRIDGE OVER 16 BLACKLICK CREEK, WEST WHEATFIELD 17 TOWNSHIP, BRIDGE PAINTING 200,000 18 (BASE CONSTRUCTION ALLOCATION - 19 $185,000) 20 (DESIGN AND CONTINGENCIES - $15,000) 21 (19) SR 0286, CLYMER BRIDGE OVER TWOLICK 22 CREEK, CLYMER BOROUGH, BRIDGE PAINTING 175,000 23 (BASE CONSTRUCTION ALLOCATION - 24 $160,000) 25 (DESIGN AND CONTINGENCIES - $15,000) 26 (20) SR 0422, TWOLICK EASTBOUND BRIDGE 27 OVER TWOLICK CREEK, WHITE TOWNSHIP, 28 BRIDGE PAINTING 360,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $345,000) 19970H0030B0757 - 189 -
1 (DESIGN AND CONTINGENCIES - $15,000) 2 (21) SR 0422, TWOLICK WESTBOUND BRIDGE 3 OVER TWOLICK CREEK, WHITE TOWNSHIP, 4 BRIDGE PAINTING 360,000 5 (BASE CONSTRUCTION ALLOCATION - 6 $345,000) 7 (DESIGN AND CONTINGENCIES - $15,000) 8 (22) SR 0422, PENN RUN EXIT BRIDGE 9 EASTBOUND OVER TR 840, WHITE TOWNSHIP, 10 BRIDGE PAINTING 190,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $175,000) 13 (DESIGN AND CONTINGENCIES - $15,000) 14 (23) SR 0422, PENN RUN EXIT BRIDGE 15 WESTBOUND OVER TR 840, WHITE TOWNSHIP, 16 BRIDGE PAINTING 190,000 17 (BASE CONSTRUCTION ALLOCATION - 18 $175,000) 19 (DESIGN AND CONTINGENCIES - $15,000) 20 (24) SR 0580, CUSH CUSHION CREEK BRIDGE 21 OVER CUSH CUSHION CREEK, GREEN 22 TOWNSHIP, BRIDGE PAINTING 85,000 23 (BASE CONSTRUCTION ALLOCATION - 24 $70,000) 25 (DESIGN AND CONTINGENCIES - $15,000) 26 (25) SR 0954, YELLOW CREEK BRIDGE OVER 27 YELLOW CREEK, WHITE TOWNSHIP, BRIDGE 28 PAINTING 125,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $110,000) 19970H0030B0757 - 190 -
1 (DESIGN AND CONTINGENCIES - $15,000) 2 (26) SR 0954, CREEKSIDE BRIDGE OVER 3 CROOKED CREEK, WHITE TOWNSHIP, BRIDGE 4 PAINTING 125,000 5 (BASE CONSTRUCTION ALLOCATION - 6 $110,000) 7 (DESIGN AND CONTINGENCIES - $15,000) 8 (27) SR 0954, SOUTH BRANCH BRIDGE OVER 9 SOUTH BRANCH OF PLUM CREEK, WASHINGTON 10 TOWNSHIP, BRIDGE PAINTING 75,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $60,000) 13 (DESIGN AND CONTINGENCIES - $15,000) 14 (28) SR 1004, PHILADELPHIA STREET EXIT 15 BRIDGE OVER SR 0119, WHITE TOWNSHIP, 16 BRIDGE PAINTING 235,000 17 (BASE CONSTRUCTION ALLOCATION - 18 $220,000) 19 (DESIGN AND CONTINGENCIES - $15,000) 20 (29) SR 1006, JIMMY STEWART AIRPORT BRIDGE 21 OVER SR 0119, WHITE TOWNSHIP, BRIDGE 22 PAINTING 245,000 23 (BASE CONSTRUCTION ALLOCATION - 24 $230,000) 25 (DESIGN AND CONTINGENCIES - $15,000) 26 (30) SR 1007, TANOMA BRIDGE OVER CROOKED 27 CREEK, RAYNE TOWNSHIP, BRIDGE PAINTING 75,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $60,000) 30 (DESIGN AND CONTINGENCIES - $15,000) 19970H0030B0757 - 191 -
1 (31) SR 1014, DIAMONDVILLE BRIDGE OVER 2 NORTH BRANCH OF TWOLICK CREEK, GREEN 3 TOWNSHIP, BRIDGE PAINTING 75,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $60,000) 6 (DESIGN AND CONTINGENCIES - $15,000) 7 (32) SR 1017, PINE FLATS BRIDGE OVER SOUTH 8 BRANCH OF TWOLICK CREEK, GREEN 9 TOWNSHIP, BRIDGE PAINTING 95,000 10 (BASE CONSTRUCTION ALLOCATION - 11 $80,000) 12 (DESIGN AND CONTINGENCIES - $15,000) 13 (33) SR 1033, GYPSY BRIDGE OVER CUSH 14 CREEK, MONTGOMERY TOWNSHIP, BRIDGE 15 PAINTING 85,000 16 (BASE CONSTRUCTION ALLOCATION - 17 $70,000) 18 (DESIGN AND CONTINGENCIES - $15,000) 19 (34) SR 1034, LOWER WILGUS BRIDGE OVER 20 BRANCH OF CUSH CREEK, MONTGOMERY 21 TOWNSHIP, BRIDGE PAINTING 55,000 22 (BASE CONSTRUCTION ALLOCATION - 23 $40,000) 24 (DESIGN AND CONTINGENCIES - $15,000) 25 (35) SR 1038, CROOKED RUN BRIDGE OVER 26 CROOKED RUN, EAST MAHONING TOWNSHIP, 27 BRIDGE PAINTING 60,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $45,000) 30 (DESIGN AND CONTINGENCIES - $15,000) 19970H0030B0757 - 192 -
1 (36) SR 1045, BROADHEAD RUN BRIDGE OVER 2 BROADHEAD RUN, CANOE TOWNSHIP, BRIDGE 3 PAINTING 70,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $55,000) 6 (DESIGN AND CONTINGENCIES - $15,000) 7 (37) SR 1045, JUNEAU BRIDGE OVER CANOE 8 CREEK, CANOE TOWNSHIP, BRIDGE PAINTING 75,000 9 (BASE CONSTRUCTION ALLOCATION - 10 $60,000) 11 (DESIGN AND CONTINGENCIES - $15,000) 12 (38) SR 1046, STRAIGHT RUN BRIDGE OVER 13 STRAIGHT RUN, BANKS TOWNSHIP, BRIDGE 14 PAINTING 80,000 15 (BASE CONSTRUCTION ALLOCATION - 16 $65,000) 17 (DESIGN AND CONTINGENCIES - $15,000) 18 (39) SR 2019, TEARING RUN BRIDGE NO.1 OVER 19 TEARING RUN, CENTER TOWNSHIP, BRIDGE 20 PAINTING 55,000 21 (BASE CONSTRUCTION ALLOCATION - 22 $40,000) 23 (DESIGN AND CONTINGENCIES - $15,000) 24 (40) SR 2019, TEARING RUN BRIDGE NO.2 OVER 25 TEARING RUN, CENTER TOWNSHIP, BRIDGE 26 PAINTING 65,000 27 (BASE CONSTRUCTION ALLOCATION - 28 $50,000) 29 (DESIGN AND CONTINGENCIES - $15,000) 30 (41) SR 3003, TUNNELTON BRIDGE OVER 19970H0030B0757 - 193 -
1 CONEMAUGH RIVER, CONEMAUGH TOWNSHIP, 2 BRIDGE PAINTING 525,000 3 (BASE CONSTRUCTION ALLOCATION - 4 $510,000) 5 (DESIGN AND CONTINGENCIES - $15,000) 6 (42) SR 3007, CLARKSBURG BRIDGE OVER 7 BLACKLEGS CREEK, CONEMAUGH TOWNSHIP, 8 BRIDGE PAINTING 105,000 9 (BASE CONSTRUCTION ALLOCATION - 10 $90,000) 11 (DESIGN AND CONTINGENCIES - $15,000) 12 (43) SR 3011, BLACKLICK CREEK BRIDGE NO.1 13 OVER BLACKLICK CREEK, BRUSH VALLEY 14 TOWNSHIP, BRIDGE PAINTING 405,000 15 (BASE CONSTRUCTION ALLOCATION - 16 $390,000) 17 (DESIGN AND CONTINGENCIES - $15,000) 18 (44) SR 3011, BLACKLICK CREEK BRIDGE NO.2 19 OVER BLACKLICK CREEK, BLACKLICK 20 TOWNSHIP, BRIDGE PAINTING 405,000 21 (BASE CONSTRUCTION ALLOCATION - 22 $390,000) 23 (DESIGN AND CONTINGENCIES - $15,000) 24 (45) SR 3013, MUDDY RUN BRIDGE OVER MUDDY 25 RUN, BLACKLICK TOWNSHIP, BRIDGE 26 PAINTING 65,000 27 (BASE CONSTRUCTION ALLOCATION - 28 $50,000) 29 (DESIGN AND CONTINGENCIES - $15,000) 30 (46) SR 3016, HOMER CITY BRIDGE OVER 19970H0030B0757 - 194 -
1 TWOLICK CREEK, HOMER CITY BOROUGH, 2 BRIDGE PAINTING 125,000 3 (BASE CONSTRUCTION ALLOCATION - 4 $110,000) 5 (DESIGN AND CONTINGENCIES - $15,000) 6 (47) SR 3031, BLACKLEGS RUN BRIDGE OVER 7 BLACKLEGS RUN, YOUNG TOWNSHIP, BRIDGE 8 PAINTING 65,000 9 (BASE CONSTRUCTION ALLOCATION - 10 $50,000) 11 (DESIGN AND CONTINGENCIES - $15,000) 12 (48) SR 3037, WALKER RUN BRIDGE OVER 13 WALKER RUN, ARMSTRONG TOWNSHIP, BRIDGE 14 PAINTING 55,000 15 (BASE CONSTRUCTION ALLOCATION - 16 $40,000) 17 (DESIGN AND CONTINGENCIES - $15,000) 18 (49) SR 3039, ANTHONY RUN BRIDGE OVER 19 ANTHONY RUN, ARMSTRONG TOWNSHIP, BRIDGE 20 PAINTING 55,000 21 (BASE CONSTRUCTION ALLOCATION - 22 $40,000) 23 (DESIGN AND CONTINGENCIES - $15,000) 24 (50) SR 4001, FISHER SIDING BRIDGE OVER 25 CROOKED CREEK, ARMSTRONG TOWNSHIP, 26 BRIDGE PAINTING 110,000 27 (BASE CONSTRUCTION ALLOCATION - 28 $95,000) 29 (DESIGN AND CONTINGENCIES - $15,000) 30 (51) SR 4001, FIVE POINTS BRIDGE OVER 19970H0030B0757 - 195 -
1 SOUTH BRANCH OF PLUM CREEK, WASHINGTON 2 TOWNSHIP, BRIDGE PAINTING 100,000 3 (BASE CONSTRUCTION ALLOCATION - 4 $85,000) 5 (DESIGN AND CONTINGENCIES - $15,000) 6 (52) SR 4006, REDDINGS RUN BRIDGE OVER 7 REDDINGS RUN, WASHINGTON TOWNSHIP, 8 BRIDGE PAINTING 55,000 9 (BASE CONSTRUCTION ALLOCATION - 10 $40,000) 11 (DESIGN AND CONTINGENCIES - $15,000) 12 (53) SR 4008, KIMMEL STATION BRIDGE NO.1 13 OVER BRANCH OF CROOKED CREEK, RAYNE 14 TOWNSHIP, BRIDGE PAINTING 50,000 15 (BASE CONSTRUCTION ALLOCATION - 16 $35,000) 17 (DESIGN AND CONTINGENCIES - $15,000) 18 (54) SR 4008, KIMMEL STATION BRIDGE NO.2 19 OVER BRANCH OF CROOKED CREEK, RAYNE 20 TOWNSHIP, BRIDGE PAINTING 50,000 21 (BASE CONSTRUCTION ALLOCATION - 22 $35,000) 23 (DESIGN AND CONTINGENCIES - $15,000) 24 (55) SR 4035, PLUMVILLE BRIDGE OVER PLUM 25 CREEK, PLUMVILLE BOROUGH, BRIDGE 26 PAINTING 75,000 27 (BASE CONSTRUCTION ALLOCATION - 28 $60,000) 29 (DESIGN AND CONTINGENCIES - $15,000) 30 (56) SR 0056, SEWARD CONRAIL OVERPASS, 19970H0030B0757 - 196 -
1 EAST WHEATFIELD TOWNSHIP, BRIDGE 2 REPLACEMENT 2,570,000 3 (BASE CONSTRUCTION ALLOCATION - 4 $2,080,000) 5 (LAND ALLOCATION - $150,000) 6 (DESIGN AND CONTINGENCIES - $340,000) 7 SECTION 37. JEFFERSON COUNTY. 8 (A) LOCAL BRIDGES 9 (1) SUMMERVILLE BOROUGH, COUNTY BRIDGE 40- 10 A, ANDERSON ROAD BRIDGE OVER RUNAWAY 11 RUN, BRIDGE REHABILITATION 415,000 12 (BASE CONSTRUCTION ALLOCATION - 13 $345,000) 14 (LAND ALLOCATION - $10,000) 15 (DESIGN AND CONTINGENCIES - $60,000) 16 (2) SYKESVILLE BOROUGH, STATION STREET 17 BRIDGE OVER STUMP CREEK, BRIDGE 18 REPLACEMENT 570,000 19 (BASE CONSTRUCTION ALLOCATION - 20 $500,000) 21 (LAND ALLOCATION - $10,000) 22 (DESIGN AND CONTINGENCIES - $60,000) 23 (3) ELDRED TOWNSHIP, T-346 OVER MILL 24 CREEK, BRIDGE REPLACEMENT 420,000 25 (BASE CONSTRUCTION ALLOCATION - 26 $330,000) 27 (LAND ALLOCATION - $10,000) 28 (DESIGN AND CONTINGENCIES - $80,000) 29 (4) ELDRED TOWNSHIP, T-353 OVER MILL RUN, 30 BRIDGE REPLACEMENT 245,000 19970H0030B0757 - 197 -
1 (BASE CONSTRUCTION ALLOCATION - 2 $200,000) 3 (LAND ALLOCATION - $10,000) 4 (DESIGN AND CONTINGENCIES - $35,000) 5 (5) OLIVER TOWNSHIP, T-718 OVER LITTLE 6 SANDY CREEK, BRIDGE REPLACEMENT 490,000 7 (BASE CONSTRUCTION ALLOCATION - 8 $400,000) 9 (LAND ALLOCATION - $10,000) 10 (DESIGN AND CONTINGENCIES - $80,000) 11 (6) UNION TOWNSHIP, T-320 OVER LITTLE MILL 12 CREEK, BRIDGE REPLACEMENT 245,000 13 (BASE CONSTRUCTION ALLOCATION - 14 $200,000) 15 (LAND ALLOCATION - $10,000) 16 (DESIGN AND CONTINGENCIES - $35,000) 17 (7) UNION TOWNSHIP, T-321 OVER RUNAWAY 18 RUN, BRIDGE REPLACEMENT 145,000 19 (BASE CONSTRUCTION ALLOCATION - 20 $100,000) 21 (LAND ALLOCATION - $5,000) 22 (DESIGN AND CONTINGENCIES - $40,000) 23 (8) YOUNG TOWNSHIP, T-632 OVER SAW MILL 24 RUN, BRIDGE REPLACEMENT 310,000 25 (BASE CONSTRUCTION ALLOCATION - 26 $250,000) 27 (LAND ALLOCATION - $10,000) 28 (DESIGN AND CONTINGENCIES - $50,000) 29 (9) YOUNG TOWNSHIP, T-632, BRIDGE NO.JC-36 30 OVER SAWMILL RUN, BRIDGE REPLACEMENT 330,000 19970H0030B0757 - 198 -
1 (BASE CONSTRUCTION ALLOCATION - 2 $270,000) 3 (DESIGN AND CONTINGENCIES - $60,000) 4 (B) STATE BRIDGES 5 (1) SR 3033, T-830, KNOX NO.1 BRIDGE OVER 6 SWAMP RUN, KNOX TOWNSHIP, BRIDGE 7 REPLACEMENT 446,000 8 (BASE CONSTRUCTION ALLOCATION - 9 $376,000) 10 (LAND ALLOCATION - $10,000) 11 (DESIGN AND CONTINGENCIES - $60,000) 12 (2) SR 0036, SAWMILL RUN BRIDGE OVER 13 SAWMILL RUN, PUNXSUTAWNEY BOROUGH, 14 BRIDGE PAINTING 60,000 15 (BASE CONSTRUCTION ALLOCATION - 16 $45,000) 17 (DESIGN AND CONTINGENCIES - $15,000) 18 (3) SR 0119, PUNXSUTAWNEY BRIDGE OVER 19 MAHONING CREEK, PUNXSUTAWNEY BOROUGH, 20 BRIDGE PAINTING 250,000 21 (BASE CONSTRUCTION ALLOCATION - 22 $235,000) 23 (DESIGN AND CONTINGENCIES - $15,000) 24 (4) SR 0410, BEAVER RUN BRIDGE OVER BEAVER 25 RUN, HENDERSON TOWNSHIP, BRIDGE 26 PAINTING 55,000 27 (BASE CONSTRUCTION ALLOCATION - 28 $40,000) 29 (DESIGN AND CONTINGENCIES - $15,000) 30 (5) SR 0830, FALLS CREEK BRIDGE OVER FALLS 19970H0030B0757 - 199 -
1 CREEK, FALLS CREEK TOWNSHIP, BRIDGE 2 PAINTING 80,000 3 (BASE CONSTRUCTION ALLOCATION - 4 $65,000) 5 (DESIGN AND CONTINGENCIES - $15,000) 6 (6) SR 0949, CORSICA EXIT BRIDGE OVER I- 7 80, UNION TOWNSHIP, BRIDGE PAINTING 205,000 8 (BASE CONSTRUCTION ALLOCATION - 9 $190,000) 10 (DESIGN AND CONTINGENCIES - $15,000) 11 (7) SR 1009, KYLE'S RUN BRIDGE OVER KYLE'S 12 RUN, WASHINGTON TOWNSHIP, BRIDGE 13 PAINTING 60,000 14 (BASE CONSTRUCTION ALLOCATION - 15 $45,000) 16 (DESIGN AND CONTINGENCIES - $15,000) 17 (8) SR 1027, EGYPT BRIDGE OVER NORTH FORK 18 CREEK, ROCK TOWNSHIP, BRIDGE PAINTING 125,000 19 (BASE CONSTRUCTION ALLOCATION - 20 $110,000) 21 (DESIGN AND CONTINGENCIES - $15,000) 22 (9) SR 2007, CLOVER RUN BRIDGE OVER CLOVER 23 RUN, GASKILL TOWNSHIP, BRIDGE PAINTING 95,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $80,000) 26 (DESIGN AND CONTINGENCIES - $15,000) 27 (10) SR 2008, STUMP CREEK BRIDGE OVER 28 STUMP CREEK, HENDERSON TOWNSHIP, BRIDGE 29 PAINTING 100,000 30 (BASE CONSTRUCTION ALLOCATION - 19970H0030B0757 - 200 -
1 $85,000) 2 (DESIGN AND CONTINGENCIES - $15,000) 3 (11) SR 2023, ANITA BRIDGE OVER ELK RUN, 4 MCCALMONT TOWNSHIP, BRIDGE PAINTING 60,000 5 (BASE CONSTRUCTION ALLOCATION - 6 $45,000) 7 (DESIGN AND CONTINGENCIES - $15,000) 8 (12) SR 2023, CHARCOAL PLANT BRIDGE OVER 9 SANDY LICK CREEK, PINE CREEK TOWNSHIP, 10 BRIDGE PAINTING 125,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $110,000) 13 (DESIGN AND CONTINGENCIES - $15,000) 14 (13) SR 3003, BAXTER BRIDGE OVER REDBANK 15 CREEK, CLOVER TOWNSHIP, BRIDGE 16 PAINTING 235,000 17 (BASE CONSTRUCTION ALLOCATION - 18 $220,000) 19 (DESIGN AND CONTINGENCIES - $15,000) 20 (14) SR 4006, NORTH FORK CREEK BRIDGE OVER 21 NORTH FORK CREEK, WARSAW TOWNSHIP, 22 BRIDGE PAINTING 110,000 23 (BASE CONSTRUCTION ALLOCATION - 24 $95,000) 25 (DESIGN AND CONTINGENCIES - $15,000) 26 (15) SR 0310, BRIDGE OVER BRANCH OF TROUT 27 RUN, WINSLOW TOWNSHIP, BRIDGE 28 REPLACEMENT 490,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $350,000) 19970H0030B0757 - 201 -
1 (LAND ALLOCATION - $20,000) 2 (DESIGN AND CONTINGENCIES - $120,000) 3 (16) SR 3018, BRIDGE OVER LITTLE SANDY 4 CREEK, LIMESTONE TOWNSHIP, BRIDGE 5 REPLACEMENT 670,000 6 (BASE CONSTRUCTION ALLOCATION - 7 $500,000) 8 (LAND ALLOCATION - $20,000) 9 (DESIGN AND CONTINGENCIES - $150,000) 10 SECTION 38. JUNIATA COUNTY. 11 (A) LOCAL BRIDGES 12 (1) FAYETTE TOWNSHIP, T-558 OVER WEST 13 BRANCH OF COCOLAMUS CREEK, BRIDGE 14 REHABILITATION 21,000 15 (BASE CONSTRUCTION ALLOCATION - 16 $18,000) 17 (DESIGN AND CONTINGENCIES - $3,000) 18 (2) FAYETTE TOWNSHIP, T-602 OVER LITTLE 19 LOST CREEK, BRIDGE REHABILITATION 19,000 20 (BASE CONSTRUCTION ALLOCATION - 21 $17,000) 22 (DESIGN AND CONTINGENCIES - $2,000) 23 (B) STATE BRIDGES 24 (1) SR 0850, LAUREL RUN BRIDGE OVER LAUREL 25 RUN, VILLAGE OF HONEY GROVE, TUSCARORA 26 TOWNSHIP, BRIDGE REPLACEMENT 670,000 27 (BASE CONSTRUCTION ALLOCATION - 28 $500,000) 29 (LAND ALLOCATION - $20,000) 30 (DESIGN AND CONTINGENCIES - $150,000) 19970H0030B0757 - 202 -
1 (2) SR 0850, BRIDGE OVER TUSCARORA CREEK, 2 TUSCARORA TOWNSHIP, BRIDGE 3 REHABILITATION 155,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $150,000) 6 (DESIGN AND CONTINGENCIES - $5,000) 7 (3) SR 0850, BRIDGE OVER TUSCARORA CREEK, 8 TUSCARORA TOWNSHIP, BRIDGE REPLACEMENT 1,420,000 9 (BASE CONSTRUCTION ALLOCATION - 10 $1,280,000) 11 (LAND ALLOCATION - $40,000) 12 (DESIGN AND CONTINGENCIES - $100,000) 13 SECTION 39. LACKAWANNA COUNTY. 14 (A) LOCAL BRIDGES 15 (1) MAYFIELD BOROUGH, POPLAR STREET BRIDGE 16 NO.1 AT JUNCTION OF SOUTH WASHINGTON 17 AVENUE, BRIDGE REHABILITATION 150,000 18 (BASE CONSTRUCTION ALLOCATION - 19 $130,000) 20 (DESIGN AND CONTINGENCIES - $20,000) 21 (B) STATE BRIDGES 22 (1) SR 1016, HILL STREET BRIDGE OVER 23 LACKAWANNA RIVER, JESSUP AND BLAKELY 24 BOROUGHS, BRIDGE DECK REHABILITATION 890,000 25 (BASE CONSTRUCTION ALLOCATION - 26 $800,000) 27 (LAND ALLOCATION - $10,000) 28 (DESIGN AND CONTINGENCIES - $80,000) 29 (2) SR 3011, KEYSER AVENUE BRIDGE OVER 30 LINDY CREEK, CITY OF SCRANTON, BRIDGE 19970H0030B0757 - 203 -
1 REPLACEMENT 185,000 2 (BASE CONSTRUCTION ALLOCATION - 3 $100,000) 4 (LAND ALLOCATION - $10,000) 5 (DESIGN AND CONTINGENCIES - $75,000) 6 (3) SR 0171, BRIDGE OVER ELK CREEK AT 7 JUNCTION OF SR 1011, FELL TOWNSHIP, 8 BRIDGE REPLACEMENT 660,000 9 (BASE CONSTRUCTION ALLOCATION - 10 $520,000) 11 (LAND ALLOCATION - $10,000) 12 (DESIGN AND CONTINGENCIES - $130,000) 13 (4) SR 0247, BRIDGE OVER SOUTH BRANCH OF 14 TUNKHANNOCK CREEK, NORTH OF TR 438, 15 SCOTT TOWNSHIP, BRIDGE REPLACEMENT 426,000 16 (BASE CONSTRUCTION ALLOCATION - 17 $330,000) 18 (LAND ALLOCATION - $10,000) 19 (DESIGN AND CONTINGENCIES - $86,000) 20 (5) SR 2003, BRIDGE OVER WALLENPAUPACK 21 CREEK, NORTH OF TR 348, JEFFERSON 22 TOWNSHIP, BRIDGE REPLACEMENT 355,000 23 (BASE CONSTRUCTION ALLOCATION - 24 $275,000) 25 (LAND ALLOCATION - $10,000) 26 (DESIGN AND CONTINGENCIES - $70,000) 27 (6) SR 3013, MAIN STREET BRIDGE, OLD FORGE 28 BOROUGH, BRIDGE PAINTING 660,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $600,000) 19970H0030B0757 - 204 -
1 (DESIGN AND CONTINGENCIES - $60,000) 2 (7) STATE BRIDGES, COUNTYWIDE BRIDGE ZONE 3 PAINTING, BRIDGE PAINTING 370,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $350,000) 6 (LAND ALLOCATION - $10,000) 7 (DESIGN AND CONTINGENCIES - $10,000) 8 (8) SR 1013, BRIDGE OVER ELM BROOK, 0.7 9 MILE NORTH OF SR 1006, SCOTT TOWNSHIP, 10 BRIDGE REPLACEMENT 240,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $200,000) 13 (LAND ALLOCATION - $10,000) 14 (DESIGN AND CONTINGENCIES - $30,000) 15 SECTION 40. LANCASTER COUNTY. 16 (A) LOCAL BRIDGES 17 (1) MANOR TOWNSHIP, T-599, WEST ROSEVILLE 18 ROAD BRIDGE OVER LITTLE CONESTOGA 19 CREEK, BRIDGE REPLACEMENT 375,000 20 (BASE CONSTRUCTION ALLOCATION - 21 $286,000) 22 (LAND ALLOCATION - $10,000) 23 (DESIGN AND CONTINGENCIES - $150,000) 24 (2) MT. JOY TOWNSHIP, T-350, RISSER MILL 25 BRIDGE OVER TRIBUTARY OF LITTLE 26 CHICKIES CREEK, BRIDGE REHABILITATION 550,000 27 (BASE CONSTRUCTION ALLOCATION - 28 $400,000) 29 (DESIGN AND CONTINGENCIES - $150,000) 30 (3) PEQUEA TOWNSHIP, SILVER MINE ROAD AT 19970H0030B0757 - 205 -
1 BURNT MILLS, BRIDGE REPLACEMENT 100,000 2 (BASE CONSTRUCTION ALLOCATION - 3 $90,000) 4 (DESIGN AND CONTINGENCIES - $10,000) 5 (4) EAST HEMPFIELD AND MANHEIM TOWNSHIPS, 6 SHREINER STATION ROAD BRIDGE OVER 7 CONESTOGA CREEK, BRIDGE REPLACEMENT 477,000 8 (BASE CONSTRUCTION ALLOCATION - 9 $377,000) 10 (LAND ALLOCATION - $20,000) 11 (DESIGN AND CONTINGENCIES - $80,000) 12 (B) STATE BRIDGES 13 (1) SR 1024, BRIDGE OVER LITTLE COCALICO 14 CREEK, EAST COCALICO TOWNSHIP, BRIDGE 15 REPLACEMENT 675,000 16 (BASE CONSTRUCTION ALLOCATION - 17 $550,000) 18 (LAND ALLOCATION - $25,000) 19 (DESIGN AND CONTINGENCIES - $100,000) 20 SECTION 41. LAWRENCE COUNTY. 21 (A) LOCAL BRIDGES 22 (1) CITY OF NEW CASTLE, WILLARD AVENUE 23 BRIDGE OVER TRIBUTARY OF SHENANGO 24 RIVER, BRIDGE REPLACEMENT 210,000 25 (BASE CONSTRUCTION ALLOCATION - 26 $150,000) 27 (LAND ALLOCATION - $20,000) 28 (DESIGN AND CONTINGENCIES - $40,000) 29 (2) WAMPUM BOROUGH, MAIN STREET BRIDGE 30 OVER ECKLES RUN, BRIDGE REHABILITATION 190,000 19970H0030B0757 - 206 -
1 (BASE CONSTRUCTION ALLOCATION - 2 $150,000) 3 (DESIGN AND CONTINGENCIES - $40,000) 4 (B) STATE BRIDGES 5 (1) SR 0018, MAHONING AVENUE VIADUCT OVER 6 SHENANGO RIVER AND RAILROAD, CITY OF 7 NEW CASTLE, BRIDGE REPLACEMENT 9,320,000 8 (BASE CONSTRUCTION ALLOCATION - 9 $9,000,000) 10 (LAND ALLOCATION - $20,000) 11 (DESIGN AND CONTINGENCIES - $300,000) 12 (2) SR 0018, LIBERTY STREET BRIDGE OVER 13 HICKORY RUN, NEW CASTLE CITY, BRIDGE 14 REHABILITATION 450,000 15 (BASE CONSTRUCTION ALLOCATION - 16 $300,000) 17 (LAND ALLOCATION - $50,000) 18 (DESIGN AND CONTINGENCIES - $100,000) 19 (3) SR 0060, SR 0060 SOUTHBOUND OVER SR 20 4004, NESHANNOCK TOWNSHIP, BRIDGE 21 REPLACEMENT 350,000 22 (BASE CONSTRUCTION ALLOCATION - 23 $200,000) 24 (LAND ALLOCATION - $50,000) 25 (DESIGN AND CONTINGENCIES - $100,000) 26 (4) SR 0065, ELLWOOD ROAD BRIDGE OVER B&O 27 RAILROAD, SHENANGO TOWNSHIP, BRIDGE 28 REPLACEMENT 400,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $250,000) 19970H0030B0757 - 207 -
1 (LAND ALLOCATION - $50,000) 2 (DESIGN AND CONTINGENCIES - $100,000) 3 (5) SR 0488, PORTERSVILLE ROAD BRIDGE OVER 4 MORRISON RUN, PERRY TOWNSHIP, BRIDGE 5 REPLACEMENT 250,000 6 (BASE CONSTRUCTION ALLOCATION - 7 $100,000) 8 (LAND ALLOCATION - $50,000) 9 (DESIGN AND CONTINGENCIES - $100,000) 10 (6) SR 0488, PORTERSVILLE ROAD BRIDGE OVER 11 MORRISON RUN, PERRY TOWNSHIP, BRIDGE 12 REPLACEMENT 250,000 13 (BASE CONSTRUCTION ALLOCATION - 14 $100,000) 15 (LAND ALLOCATION - $50,000) 16 (DESIGN AND CONTINGENCIES - $100,000) 17 (7) SR 3001, SOUTH MAIN STREET BRIDGE OVER 18 BESSEMER HAUL ROAD, BESSEMER BOROUGH, 19 BRIDGE REHABILITATION 950,000 20 (BASE CONSTRUCTION ALLOCATION - 21 $800,000) 22 (DESIGN AND CONTINGENCIES - $150,000) 23 (8) SR 4004, UNION AND NESHANNOCK 24 TOWNSHIPS, BRIDGE REHABILITATION 800,000 25 (BASE CONSTRUCTION ALLOCATION - 26 $700,000) 27 (DESIGN AND CONTINGENCIES - $100,000) 28 (9) SR 0060, BEAVER VALLEY EXPANSION 29 BRIDGE OVER SR 4005, NESHANNOCK 30 TOWNSHIP, BRIDGE REHABILITATION 650,000 19970H0030B0757 - 208 -
1 (BASE CONSTRUCTION ALLOCATION - 2 $500,000) 3 (DESIGN AND CONTINGENCIES - $150,000) 4 (10) SR 0060, BEAVER VALLEY EXTENSION 5 BRIDGE OVER SR 4005, NESHANNOCK 6 TOWNSHIP, BRIDGE REHABILITATION 127,000 7 (BASE CONSTRUCTION ALLOCATION - 8 $116,000) 9 (DESIGN AND CONTINGENCIES - $11,000) 10 (11) SR 0081, US 224 STATE STREET BRIDGE 11 OVER SR 0422 AND RAMP K, UNION 12 TOWNSHIP, BRIDGE REHABILITATION 706,000 13 (BASE CONSTRUCTION ALLOCATION - 14 $644,000) 15 (DESIGN AND CONTINGENCIES - $62,000) 16 (12) SR 0422, WESTBOUND BRIDGE OVER BEAVER 17 RIVER, RAILROAD AND LOCAL STREET, 18 TAYLOR TOWNSHIP, BRIDGE REHABILITATION 6,841,000 19 (BASE CONSTRUCTION ALLOCATION - 20 $6,741,000) 21 (DESIGN AND CONTINGENCIES - $100,000) 22 (13) SR 0422, EASTBOUND BRIDGE OVER BEAVER 23 RIVER, RAILROAD AND LOCAL STREET, 24 TAYLOR TOWNSHIP, BRIDGE REPLACEMENT 6,963,000 25 (BASE CONSTRUCTION ALLOCATION - 26 $6,863,000) 27 (DESIGN AND CONTINGENCIES - $100,000) 28 (14) SR 0422, BRIDGE OVER BUSINESS US 422, 29 UNION TOWNSHIP, BRIDGE REHABILITATION 1,379,000 30 (BASE CONSTRUCTION ALLOCATION - 19970H0030B0757 - 209 -
1 $1,254,000) 2 (DESIGN AND CONTINGENCIES - $125,000) 3 (15) SR 0422, BEN FRANKLIN HIGHWAY BRIDGE 4 OVER BUSINESS US 422, UNION TOWNSHIP, 5 BRIDGE REHABILITATION 436,000 6 (BASE CONSTRUCTION ALLOCATION - 7 $398,000) 8 (DESIGN AND CONTINGENCIES - $38,000) 9 (16) SR 0551, MAIN STREET BRIDGE OVER 10 BEAVER CREEK, LITTLE BEAVER TOWNSHIP, 11 BRIDGE REPLACEMENT 624,000 12 (BASE CONSTRUCTION ALLOCATION - 13 $524,000) 14 (DESIGN AND CONTINGENCIES - $100,000) 15 (17) SR 2020, PLEASANT ROAD BRIDGE OVER 16 CAMP RUN, PERRY TOWNSHIP, BRIDGE 17 REPLACEMENT 400,000 18 (BASE CONSTRUCTION ALLOCATION - 19 $300,000) 20 (DESIGN AND CONTINGENCIES - $100,000) 21 (18) SR 3002, BEAVER DAM ROAD BRIDGE OVER 22 HONEY CREEK, LITTLE BEAVER TOWNSHIP, 23 BRIDGE PAINTING 30,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $25,000) 26 (DESIGN AND CONTINGENCIES - $5,000) 27 (19) SR 3004, WALLACE ROAD BRIDGE OVER 28 SUGAR CREEK, NORTH BEAVER TOWNSHIP, 29 BRIDGE REPLACEMENT 130,000 30 (BASE CONSTRUCTION ALLOCATION - 19970H0030B0757 - 210 -
1 $120,000) 2 (DESIGN AND CONTINGENCIES - $10,000) 3 (20) SR 3004, WALLACE ROAD BRIDGE OVER 4 BRANCH OF HONEY CREEK, NORTH BEAVER 5 TOWNSHIP, BRIDGE PAINTING 30,000 6 (BASE CONSTRUCTION ALLOCATION - 7 $25,000) 8 (DESIGN AND CONTINGENCIES - $5,000) 9 (21) SR 3004, WALLACE ROAD BRIDGE OVER 10 BRANCH OF HONEY CREEK, NORTH BEAVER 11 TOWNSHIP, BRIDGE PAINTING 325,000 12 (BASE CONSTRUCTION ALLOCATION - 13 $300,000) 14 (DESIGN AND CONTINGENCIES - $25,000) 15 (22) SR 4006, COFFEE RUN BRIDGE OVER 16 COFFEE RUN, MAHONING TOWNSHIP, BRIDGE 17 REPLACEMENT 335,000 18 (BASE CONSTRUCTION ALLOCATION - 19 $270,000) 20 (LAND ALLOCATION - $15,000) 21 (DESIGN AND CONTINGENCIES - $50,000) 22 (23) SR 0224, BRIDGE OVER CONRAIL, 23 MAHONING TOWNSHIP, BRIDGE REPLACEMENT 2,000,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $1,700,000) 26 (LAND ALLOCATION - $100,000) 27 (DESIGN AND CONTINGENCIES - $200,000) 28 SECTION 42. LEBANON COUNTY. 29 (A) LOCAL BRIDGES 30 (1) UNION TOWNSHIP, T-617, GREEN POINT 19970H0030B0757 - 211 -
1 SCHOOL HOUSE BRIDGE OVER TROUT RUN, 2 BRIDGE REPLACEMENT 255,000 3 (BASE CONSTRUCTION ALLOCATION - 4 $170,000) 5 (LAND ALLOCATION - $10,000) 6 (DESIGN AND CONTINGENCIES - $75,000) 7 (2) BETHEL TOWNSHIP, MARKET DRIVE, T-545 8 OVER BEACH RUN, BRIDGE REPLACEMENT 30,000 9 (BASE CONSTRUCTION ALLOCATION - 10 $20,000) 11 (DESIGN AND CONTINGENCIES - $10,000) 12 (3) SOUTH LONDONDERRY TOWNSHIP, PATRICK 13 ROAD, T-331 OVER TRIBUTARY OF LITTLE 14 CONEWAGO CREEK, BRIDGE REHABILITATION 5,000 15 (BASE CONSTRUCTION ALLOCATION - $4,000) 16 (DESIGN AND CONTINGENCIES - $1,000) 17 (4) SOUTH LONDONDERRY TOWNSHIP, ECKERT 18 ROAD, T-304 OVER LITTLE CONEWAGO CREEK, 19 BRIDGE REHABILITATION 5,000 20 (BASE CONSTRUCTION ALLOCATION - $4,000) 21 (DESIGN AND CONTINGENCIES - $1,000) 22 (5) SOUTH LONDONDERRY TOWNSHIP, RISSER 23 ROAD, T-300 OVER CONEWAGO CREEK, BRIDGE 24 REHABILITATION 4,000 25 (BASE CONSTRUCTION ALLOCATION - $3,000) 26 (DESIGN AND CONTINGENCIES - $1,000) 27 (6) SOUTH LONDONDERRY TOWNSHIP, LONG ROAD, 28 T-304 OVER TRIBUTARY OF CONEWAGO CREEK, 29 BRIDGE REHABILITATION 4,000 30 (BASE CONSTRUCTION ALLOCATION - $3,000) 19970H0030B0757 - 212 -
1 (DESIGN AND CONTINGENCIES - $1,000) 2 (7) SOUTH LONDONDERRY TOWNSHIP, ECKERT 3 ROAD, T-304 OVER TRIBUTARY OF LITTLE 4 CONEWAGO CREEK, BRIDGE REHABILITATION 5,000 5 (BASE CONSTRUCTION ALLOCATION - $4,000) 6 (DESIGN AND CONTINGENCIES - $1,000) 7 (8) SOUTH LONDONDERRY TOWNSHIP, CHURCH 8 ROAD, T-303 OVER UNNAMED CREEK, BRIDGE 9 REHABILITATION 3,000 10 (BASE CONSTRUCTION ALLOCATION - $2,000) 11 (DESIGN AND CONTINGENCIES - $1,000) 12 (9) SOUTH LONDONDERRY TOWNSHIP, PATRICK 13 ROAD, T-331 OVER TRIBUTARY OF LITTLE 14 CONEWAGO CREEK, BRIDGE REHABILITATION 4,000 15 (BASE CONSTRUCTION ALLOCATION - $3,000) 16 (DESIGN AND CONTINGENCIES - $1,000) 17 (10) SOUTH LONDONDERRY TOWNSHIP, HINKLE 18 ROAD, T-433 OVER KILLINGER CREEK, 19 BRIDGE REHABILITATION 4,000 20 (BASE CONSTRUCTION ALLOCATION - $3,000) 21 (DESIGN AND CONTINGENCIES - $1,000) 22 (11) SOUTH LONDONDERRY TOWNSHIP, BRANDT 23 ROAD, T-346 OVER KILLINGER CREEK, 24 BRIDGE REHABILITATION 3,000 25 (BASE CONSTRUCTION ALLOCATION - $2,000) 26 (DESIGN AND CONTINGENCIES - $1,000) 27 (12) UNION TOWNSHIP, GREEN POINT SCHOOL 28 HOUSE ROAD, T-617 OVER TROUT RUN, 29 BRIDGE REPLACEMENT 90,000 30 (BASE CONSTRUCTION ALLOCATION - 19970H0030B0757 - 213 -
1 $70,000) 2 (DESIGN AND CONTINGENCIES - $20,000) 3 (B) STATE BRIDGES (RESERVED) 4 SECTION 43. LEHIGH COUNTY. 5 (A) LOCAL BRIDGES (RESERVED) 6 (B) STATE BRIDGES 7 (1) SR 4007, SCHLICHER'S BRIDGE OVER 8 JORDAN CREEK, NORTH WHITEHALL TOWNSHIP, 9 BRIDGE REPLACEMENT 875,000 10 (BASE CONSTRUCTION ALLOCATION - 11 $560,000) 12 (LAND ALLOCATION - $145,000) 13 (DESIGN AND CONTINGENCIES - $170,000) 14 (2) SR 3011, FARMINGTON ROAD OVER 15 TRIBUTARY OF SCHAFFER RUN, UPPER 16 MACUNGIE TOWNSHIP, BRIDGE 17 REHABILITATION 330,000 18 (BASE CONSTRUCTION ALLOCATION - 19 $175,000) 20 (LAND ALLOCATION - $55,000) 21 (DESIGN AND CONTINGENCIES - $100,000) 22 (3) SR 1027, COLD SPRINGS ROAD OVER SPRING 23 CREEK, WHITEHALL TOWNSHIP, BRIDGE 24 REPLACEMENT 2,550,000 25 (BASE CONSTRUCTION ALLOCATION - 26 $1,640,000) 27 (LAND ALLOCATION - $420,000) 28 (DESIGN AND CONTINGENCIES - $490,000) 29 SECTION 44. LUZERNE COUNTY. 30 (A) LOCAL BRIDGES 19970H0030B0757 - 214 -
1 (1) ASHLEY BOROUGH, ASHLEY STREET BRIDGE, 2 BRIDGE REMOVAL 260,000 3 (BASE CONSTRUCTION ALLOCATION - 4 $200,000) 5 (LAND ALLOCATION - $5,000) 6 (DESIGN AND CONTINGENCIES - $55,000) 7 (2) FRANKLIN TOWNSHIP, T-784, BRIDGE OVER 8 SUTTON CREEK, BRIDGE REPLACEMENT 320,000 9 (BASE CONSTRUCTION ALLOCATION - 10 $250,000) 11 (LAND ALLOCATION - $15,000) 12 (DESIGN AND CONTINGENCIES - $55,000) 13 (3) BLACK CREEK TOWNSHIP, T-309 OVER FALLS 14 RUN CREEK, BRIDGE REPLACEMENT 395,000 15 (BASE CONSTRUCTION ALLOCATION - 16 $265,000) 17 (LAND ALLOCATION - $5,000) 18 (DESIGN AND CONTINGENCIES - $125,000) 19 (4) BLACK CREEK TOWNSHIP, T-314 OVER 20 BRANCH OF BLACK CREEK, BRIDGE 21 REPLACEMENT 440,000 22 (BASE CONSTRUCTION ALLOCATION - 23 $310,000) 24 (LAND ALLOCATION - $5,000) 25 (DESIGN AND CONTINGENCIES - $125,000) 26 (5) BUTLER TOWNSHIP, T-356 OVER NESCOPECK 27 CREEK, BRIDGE REPLACEMENT 405,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $275,000) 30 (LAND ALLOCATION - $5,000) 19970H0030B0757 - 215 -
1 (DESIGN AND CONTINGENCIES - $125,000) 2 (6) CITY OF WILKES-BARRE, DIVISION STREET 3 OVER SOLOMON'S CREEK, BRIDGE 4 REPLACEMENT 955,000 5 (BASE CONSTRUCTION ALLOCATION - 6 $800,000) 7 (LAND ALLOCATION - $5,000) 8 (DESIGN AND CONTINGENCIES - $150,000) 9 (7) DALLAS TOWNSHIP, COUNTY ROAD NO.12 10 OVER TOBY'S CREEK, BRIDGE REPLACEMENT 405,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $275,000) 13 (LAND ALLOCATION - $5,000) 14 (DESIGN AND CONTINGENCIES - $125,000) 15 (8) DENNISON TOWNSHIP, COUNTY ROAD NO.41 16 OVER NESCOPECK CREEK, BRIDGE 17 REPLACEMENT 405,000 18 (BASE CONSTRUCTION ALLOCATION - 19 $275,000) 20 (LAND ALLOCATION - $5,000) 21 (DESIGN AND CONTINGENCIES - $125,000) 22 (9) DORRANCE TOWNSHIP, COUNTY ROAD NO.30 23 OVER WAPWALLOPEN CREEK, BRIDGE 24 REPLACEMENT 405,000 25 (BASE CONSTRUCTION ALLOCATION - 26 $275,000) 27 (LAND ALLOCATION - $5,000) 28 (DESIGN AND CONTINGENCIES - $125,000) 29 (10) FAIRMOUNT TOWNSHIP, T-563 OVER MAPLE 30 RUN CREEK, BRIDGE REPLACEMENT 395,000 19970H0030B0757 - 216 -
1 (BASE CONSTRUCTION ALLOCATION - 2 $265,000) 3 (LAND ALLOCATION - $5,000) 4 (DESIGN AND CONTINGENCIES - $125,000) 5 (11) FRANKLIN TOWNSHIP, T-782 OVER SUTTON 6 CREEK, BRIDGE REPLACEMENT 405,000 7 (BASE CONSTRUCTION ALLOCATION - 8 $275,000) 9 (LAND ALLOCATION - $5,000) 10 (DESIGN AND CONTINGENCIES - $125,000) 11 (12) HUNLOCK TOWNSHIP, T-534 OVER HUNLOCK 12 CREEK, BRIDGE REPLACEMENT 405,000 13 (BASE CONSTRUCTION ALLOCATION - 14 $275,000) 15 (LAND ALLOCATION - $5,000) 16 (DESIGN AND CONTINGENCIES - $125,000) 17 (13) JACKSON TOWNSHIP, COUNTY ROAD NO.16 18 OVER TOBY'S CREEK, BRIDGE REPLACEMENT 350,000 19 (BASE CONSTRUCTION ALLOCATION - 20 $225,000) 21 (LAND ALLOCATION - $5,000) 22 (DESIGN AND CONTINGENCIES - $120,000) 23 (14) JACKSON TOWNSHIP, COUNTY ROAD NO.16 24 OVER TOBY'S CREEK, BRIDGE REPLACEMENT 370,000 25 (BASE CONSTRUCTION ALLOCATION - 26 $240,000) 27 (LAND ALLOCATION - $5,000) 28 (DESIGN AND CONTINGENCIES - $125,000) 29 (15) JACKSON TOWNSHIP, T-605 OVER BRANCH 30 OF HARVEY'S CREEK, BRIDGE REPLACEMENT 395,000 19970H0030B0757 - 217 -
1 (BASE CONSTRUCTION ALLOCATION - 2 $265,000) 3 (LAND ALLOCATION - $5,000) 4 (DESIGN AND CONTINGENCIES - $125,000) 5 (16) JACKSON TOWNSHIP, COUNTY ROAD NO.13 6 OVER TOBY'S CREEK, BRIDGE REPLACEMENT 395,000 7 (BASE CONSTRUCTION ALLOCATION - 8 $265,000) 9 (LAND ALLOCATION - $5,000) 10 (DESIGN AND CONTINGENCIES - $125,000) 11 (17) LAKE TOWNSHIP, T-796 OVER BEAVER RUN 12 CREEK, BRIDGE REPLACEMENT 410,000 13 (BASE CONSTRUCTION ALLOCATION - 14 $280,000) 15 (LAND ALLOCATION - $5,000) 16 (DESIGN AND CONTINGENCIES - $125,000) 17 (18) LAKE TOWNSHIP, T-779 OVER BRYANT POND 18 OUTLET, BRIDGE REPLACEMENT 430,000 19 (BASE CONSTRUCTION ALLOCATION - 20 $300,000) 21 (LAND ALLOCATION - $5,000) 22 (DESIGN AND CONTINGENCIES - $125,000) 23 (19) NESCOPECK TOWNSHIP, T-381 OVER BRANCH 24 OF NESCOPECK CREEK, BRIDGE REPLACEMENT 410,000 25 (BASE CONSTRUCTION ALLOCATION - 26 $280,000) 27 (LAND ALLOCATION - $5,000) 28 (DESIGN AND CONTINGENCIES - $125,000) 29 (20) ROSS TOWNSHIP, T-680 OVER HUNTINGDON 30 CREEK, BRIDGE REPLACEMENT 410,000 19970H0030B0757 - 218 -
1 (BASE CONSTRUCTION ALLOCATION - 2 $280,000) 3 (LAND ALLOCATION - $5,000) 4 (DESIGN AND CONTINGENCIES - $125,000) 5 (21) ROSS TOWNSHIP, T-571 OVER OUTLET 6 NORTH POND, BRIDGE REPLACEMENT 420,000 7 (BASE CONSTRUCTION ALLOCATION - 8 $290,000) 9 (LAND ALLOCATION - $5,000) 10 (DESIGN AND CONTINGENCIES - $125,000) 11 (22) ROSS TOWNSHIP, T-575 OVER HUNTINGDON 12 CREEK, BRIDGE REPLACEMENT 455,000 13 (BASE CONSTRUCTION ALLOCATION - 14 $325,000) 15 (LAND ALLOCATION - $5,000) 16 (DESIGN AND CONTINGENCIES - $125,000) 17 (23) ROSS TOWNSHIP, COUNTY ROAD NO.2 OVER 18 MARSH CREEK, BRIDGE REPLACEMENT 440,000 19 (BASE CONSTRUCTION ALLOCATION - 20 $310,000) 21 (LAND ALLOCATION - $5,000) 22 (DESIGN AND CONTINGENCIES - $125,000) 23 (24) SUGARLOAF TOWNSHIP, T-332 OVER BRANCH 24 OF NESCOPECK CREEK, BRIDGE REPLACEMENT 430,000 25 (BASE CONSTRUCTION ALLOCATION - 26 $300,000) 27 (LAND ALLOCATION - $5,000) 28 (DESIGN AND CONTINGENCIES - $125,000) 29 (25) PLYMOUTH TOWNSHIP, T-497 OVER MUD 30 POND INLET, BRIDGE REPLACEMENT 405,000 19970H0030B0757 - 219 -
1 (BASE CONSTRUCTION ALLOCATION - 2 $275,000) 3 (26) SLOCUM TOWNSHIP, T-454 OVER BLACK 4 CREEK, BRIDGE REPLACEMENT 395,000 5 (BASE CONSTRUCTION ALLOCATION - 6 $265,000) 7 (LAND ALLOCATION - $5,000) 8 (DESIGN AND CONTINGENCIES - $125,000) 9 (27) WRIGHT TOWNSHIP, COUNTY ROAD NO.21 10 OVER WAPWALLOPEN CREEK, BRIDGE 11 REPLACEMENT 395,000 12 (BASE CONSTRUCTION ALLOCATION - 13 $265,000) 14 (LAND ALLOCATION - $5,000) 15 (DESIGN AND CONTINGENCIES - $125,000) 16 (B) STATE BRIDGES 17 (1) SR 0011, ERIE-LACKAWANNA RAILROAD 18 BRIDGE OVER ERIE-LACKAWANNA RAILROAD, 19 PLYMOUTH TOWNSHIP, BRIDGE REMOVAL 185,000 20 (BASE CONSTRUCTION ALLOCATION - 21 $150,000) 22 (LAND ALLOCATION - $10,000) 23 (DESIGN AND CONTINGENCIES - $25,000) 24 (2) SR 1030, HARVEY'S LAKE BRIDGE AT 25 JUNCTION OF SR 1053, LAKE TOWNSHIP, 26 BRIDGE REPLACEMENT 460,000 27 (BASE CONSTRUCTION ALLOCATION - 28 $350,000) 29 (LAND ALLOCATION - $20,000) 30 (DESIGN AND CONTINGENCIES - $90,000) 19970H0030B0757 - 220 -
1 (3) SR 3007, BRIDGE OVER WAPWALLOPEN 2 CREEK, SOUTH OF SR 3010, DORRANCE 3 TOWNSHIP, BRIDGE REPLACEMENT 530,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $420,000) 6 (LAND ALLOCATION - $10,000) 7 (DESIGN AND CONTINGENCIES - $100,000) 8 (4) STATE BRIDGES, COUNTYWIDE BRIDGE ZONE 9 PAINTING, BRIDGE PAINTING 370,000 10 (BASE CONSTRUCTION ALLOCATION - 11 $350,000) 12 (LAND ALLOCATION - $10,000) 13 (DESIGN AND CONTINGENCIES - $10,000) 14 SECTION 45. LYCOMING COUNTY. 15 (A) LOCAL BRIDGES 16 (1) MIFFLIN TOWNSHIP, T-651 OVER LARRY'S 17 CREEK, BRIDGE REPLACEMENT 528,000 18 (BASE CONSTRUCTION ALLOCATION - 19 $438,000) 20 (LAND ALLOCATION - $20,000) 21 (DESIGN AND CONTINGENCIES - $70,000) 22 (2) MCINTYRE TOWNSHIP, T-667, ROLSTON 23 BRIDGE OVER LYCOMING CREEK, BRIDGE 24 REPLACEMENT 1,620,000 25 (BASE CONSTRUCTION ALLOCATION - 26 $1,400,000) 27 (LAND ALLOCATION - $20,000) 28 (DESIGN AND CONTINGENCIES - $200,000) 29 (B) STATE BRIDGES 30 (1) SR 0220, QUENSHUKENY RUN BRIDGE OVER 19970H0030B0757 - 221 -
1 QUENSHUKENY RUN, VILLAGE OF LINDEN, 2 BRIDGE REPLACEMENT 395,000 3 (BASE CONSTRUCTION ALLOCATION - 4 $316,000) 5 (LAND ALLOCATION - $20,000) 6 (DESIGN AND CONTINGENCIES - $59,000) 7 (2) SR 0973, BRIDGE OVER HOAGLAND RUN, 3 8 MILES WEST OF COGAN STATION, BRIDGE 9 REHABILITATION 195,000 10 (BASE CONSTRUCTION ALLOCATION - 11 $156,000) 12 (LAND ALLOCATION - $10,000) 13 (DESIGN AND CONTINGENCIES - $29,000) 14 (3) SR 1006, WALLIS RUN BRIDGE OVER WALLIS 15 RUN, CASCADE TOWNSHIP, BRIDGE 16 REPLACEMENT 65,000 17 (BASE CONSTRUCTION ALLOCATION - 18 $50,000) 19 (LAND ALLOCATION - $5,000) 20 (DESIGN AND CONTINGENCIES - $10,000) 21 (4) SR 2022, MILL CREEK BRIDGE, NORTH OF 22 MONTOURSVILLE, BRIDGE REPLACEMENT 668,000 23 (BASE CONSTRUCTION ALLOCATION - 24 $575,000) 25 (LAND ALLOCATION - $43,000) 26 (DESIGN AND CONTINGENCIES - $50,000) 27 (5) SR 2051, WOLF RUN BRIDGE OVER WOLF 28 RUN, SOUTH OF SR 0220, MUNCY TOWNSHIP, 29 BRIDGE REPLACEMENT 638,000 30 (BASE CONSTRUCTION ALLOCATION - 19970H0030B0757 - 222 -
1 $510,000) 2 (LAND ALLOCATION - $32,000) 3 (DESIGN AND CONTINGENCIES - $96,000) 4 (6) SR 3024, JOBS RUN ROAD BRIDGE OVER 5 TRIBUTARY OF LARRYS CREEK, EAST OF 6 SALLADASBURG, BRIDGE REPLACEMENT 108,000 7 (BASE CONSTRUCTION ALLOCATION - 8 $92,000) 9 (LAND ALLOCATION - $8,000) 10 (DESIGN AND CONTINGENCIES - $8,000) 11 (7) SR 3028, WEST 4TH STREET, LYCOMING 12 CREEK BRIDGE, CITY OF WILLIAMSPORT, 13 BRIDGE REHABILITATION 216,000 14 (BASE CONSTRUCTION ALLOCATION - 15 $185,000) 16 (LAND ALLOCATION - $15,000) 17 (DESIGN AND CONTINGENCIES - $16,000) 18 (8) SR 0044, BRIDGE OVER CONRAIL, BRIDGE 19 PAINTING 210,000 20 (BASE CONSTRUCTION ALLOCATION - 21 $200,000) 22 (DESIGN AND CONTINGENCIES - $10,000) 23 (9) SR 0180, I-180 EASTBOUND BRIDGE OVER 24 LOYALSOCK CREEK, BRIDGE PAINTING 135,000 25 (BASE CONSTRUCTION ALLOCATION - 26 $125,000) 27 (DESIGN AND CONTINGENCIES - $10,000) 28 (10) SR 0180, I-180 WESTBOUND BRIDGE OVER 29 LOYALSOCK CREEK, BRIDGE PAINTING 135,000 30 (BASE CONSTRUCTION ALLOCATION - 19970H0030B0757 - 223 -
1 $125,000) 2 (DESIGN AND CONTINGENCIES - $10,000) 3 (11) SR 2014, BRIDGE OVER LYCOMING CREEK, 4 BRIDGE PAINTING 780,000 5 (BASE CONSTRUCTION ALLOCATION - 6 $770,000) 7 (DESIGN AND CONTINGENCIES - $10,000) 8 (12) SR 2061, BRIDGE OVER LITTLE MUNCY 9 CREEK, BRIDGE PAINTING 80,000 10 (BASE CONSTRUCTION ALLOCATION - 11 $70,000) 12 (DESIGN AND CONTINGENCIES - $10,000) 13 (13) SR 0014, SR 0014 OVER TROUT RUN, 14 LEWIS TOWNSHIP, BRIDGE REPLACEMENT 640,000 15 (BASE CONSTRUCTION ALLOCATION - 16 $512,000) 17 (LAND ALLOCATION - $32,000) 18 (DESIGN AND CONTINGENCIES - $96,000) 19 (14) SR 0044, SR 0044 OVER RAMSEY RUN, 20 CUMMINGS TOWNSHIP, BRIDGE REPLACEMENT 394,000 21 (BASE CONSTRUCTION ALLOCATION - 22 $315,000) 23 (LAND ALLOCATION - $20,000) 24 (DESIGN AND CONTINGENCIES - $59,000) 25 (15) SR 0044, SR 0044 OVER PINE BOTTOM 26 RUN, CUMMINGS TOWNSHIP, BRIDGE 27 REPLACEMENT 360,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $288,000) 30 (LAND ALLOCATION - $18,000) 19970H0030B0757 - 224 -
1 (DESIGN AND CONTINGENCIES - $54,000) 2 (16) SR 0118, SR 0118 OVER BIG RUN, 3 FRANKLIN TOWNSHIP, BRIDGE REPLACEMENT 382,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $307,000) 6 (LAND ALLOCATION - $19,000) 7 (DESIGN AND CONTINGENCIES - $56,000) 8 (17) SR 0284, SR 0284 OVER BLACKS CREEK, 9 PINE TOWNSHIP, BRIDGE REPLACEMENT 700,000 10 (BASE CONSTRUCTION ALLOCATION - 11 $570,000) 12 (LAND ALLOCATION - $30,000) 13 (DESIGN AND CONTINGENCIES - $100,000) 14 (18) SR 0405, SR 0405 OVER WEST BRANCH OF 15 SUSQUEHANNA RIVER, MUNCY CREEK 16 TOWNSHIP, BRIDGE REPLACEMENT 24,924,000 17 (BASE CONSTRUCTION ALLOCATION - 18 $19,939,000) 19 (LAND ALLOCATION - $1,246,000) 20 (DESIGN AND CONTINGENCIES - $3,739,000) 21 (19) SR 0654, SR 0654 OVER MOSQUITO CREEK, 22 ANTHONY TOWNSHIP, BRIDGE REPLACEMENT 674,000 23 (BASE CONSTRUCTION ALLOCATION - 24 $539,000) 25 (LAND ALLOCATION - $34,000) 26 (DESIGN AND CONTINGENCIES - $101,000) 27 (20) SR 0973, SR 0973 OVER MUD RUN, 28 MIFFLIN TOWNSHIP, BRIDGE REPLACEMENT 294,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $252,000) 19970H0030B0757 - 225 -
1 (LAND ALLOCATION - $20,000) 2 (DESIGN AND CONTINGENCIES - $22,000) 3 (21) SR 1005, SR 1005 OVER PLUNKETTS 4 CREEK, PLUNKETTS CREEK TOWNSHIP, BRIDGE 5 REPLACEMENT 366,000 6 (BASE CONSTRUCTION ALLOCATION - 7 $293,000) 8 (LAND ALLOCATION - $18,000) 9 (DESIGN AND CONTINGENCIES - $55,000) 10 (22) SR 2061, SR 2061 OVER SUGAR RUN, 11 MORELAND TOWNSHIP, BRIDGE REPLACEMENT 443,000 12 (BASE CONSTRUCTION ALLOCATION - 13 $354,000) 14 (LAND ALLOCATION - $22,000) 15 (DESIGN AND CONTINGENCIES - $67,000) 16 (23) SR 2085, SR 2085 OVER MUNCY CREEK, 17 PENN TOWNSHIP, BRIDGE REPLACEMENT 1,050,000 18 (BASE CONSTRUCTION ALLOCATION - 19 $840,000) 20 (LAND ALLOCATION - $53,000) 21 (DESIGN AND CONTINGENCIES - $157,000) 22 (24) SR 0405, EAST WATER STREET OVER GLADE 23 RUN, MUNCY BOROUGH, BRIDGE REPLACEMENT 500,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $350,000) 26 (LAND ALLOCATION - $50,000) 27 (DESIGN AND CONTINGENCIES - $100,000) 28 SECTION 46. MCKEAN COUNTY. 29 (A) LOCAL BRIDGES 30 (1) FOSTER TOWNSHIP, T-359, GARLOCK HOLLOW 19970H0030B0757 - 226 -
1 BRIDGE OVER KENDALL CREEK, BRIDGE 2 REPLACEMENT 580,000 3 (BASE CONSTRUCTION ALLOCATION - 4 $400,000) 5 (LAND ALLOCATION - $20,000) 6 (DESIGN AND CONTINGENCIES - $160,000) 7 (B) STATE BRIDGES 8 (1) SR 3009, KINZUA CREEK BRIDGE OVER 9 KINZUA CREEK, BOROUGH OF MT. JEWETT, 10 BRIDGE REPLACEMENT 880,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $700,000) 13 (LAND ALLOCATION - $30,000) 14 (DESIGN AND CONTINGENCIES - $150,000) 15 (2) SR 4005, KENDALL CREEK BRIDGE OVER 16 KENDALL CREEK, CITY OF BRADFORD, BRIDGE 17 REPLACEMENT 800,000 18 (BASE CONSTRUCTION ALLOCATION - 19 $650,000) 20 (LAND ALLOCATION - $50,000) 21 (DESIGN AND CONTINGENCIES - $100,000) 22 SECTION 47. MERCER COUNTY. 23 (A) LOCAL BRIDGES 24 (1) CITY OF SHARON, SERVICE AVENUE BRIDGE 25 OVER PINE RUN, BRIDGE REPLACEMENT 240,000 26 (BASE CONSTRUCTION ALLOCATION - 27 $210,000) 28 (LAND ALLOCATION - $5,000) 29 (DESIGN AND CONTINGENCIES - $25,000) 30 (2) CITY OF SHARON, WENGLER AVENUE BRIDGE 19970H0030B0757 - 227 -
1 OVER PINE HOLLOW RUN, BRIDGE 2 REPLACEMENT 218,000 3 (BASE CONSTRUCTION ALLOCATION - 4 $193,000) 5 (LAND ALLOCATION - $5,000) 6 (DESIGN AND CONTINGENCIES - $20,000) 7 (3) PINE TOWNSHIP, T-355, PINCHLONG ROAD 8 BRIDGE OVER SWAMP RUN, BRIDGE 9 REPLACEMENT 203,000 10 (BASE CONSTRUCTION ALLOCATION - 11 $178,000) 12 (LAND ALLOCATION - $5,000) 13 (DESIGN AND CONTINGENCIES - $20,000) 14 (4) PINE TOWNSHIP, T-878, DIAMOND ROAD 15 BRIDGE OVER WOLF CREEK, BRIDGE 16 REPLACEMENT 1,813,000 17 (BASE CONSTRUCTION ALLOCATION - 18 $1,668,000) 19 (LAND ALLOCATION - $60,000) 20 (DESIGN AND CONTINGENCIES - $85,000) 21 (5) PINE TOWNSHIP, T-413, DAUGHERTY ROAD 22 BRIDGE OVER WOLF RUN, BRIDGE 23 REPLACEMENT 407,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $352,000) 26 (LAND ALLOCATION - $15,000) 27 (DESIGN AND CONTINGENCIES - $40,000) 28 (6) SHENANGO TOWNSHIP, T-955, OAK HILL 29 ROAD BRIDGE OVER TURKEY RUN, BRIDGE 30 REPLACEMENT 297,000 19970H0030B0757 - 228 -
1 (BASE CONSTRUCTION ALLOCATION - 2 $257,000) 3 (LAND ALLOCATION - $10,000) 4 (DESIGN AND CONTINGENCIES - $30,000) 5 (7) SHENANGO TOWNSHIP, HEASLEY ROAD BRIDGE 6 OVER TRIBUTARY OF SHENANGO RIVER, 7 BRIDGE REPLACEMENT 173,000 8 (BASE CONSTRUCTION ALLOCATION - 9 $155,000) 10 (LAND ALLOCATION - $3,000) 11 (DESIGN AND CONTINGENCIES - $15,000) 12 (8) SPRINGFIELD TOWNSHIP, T-722, SPRING 13 ROAD BRIDGE OVER MILL RUN, BRIDGE 14 REPLACEMENT 230,000 15 (BASE CONSTRUCTION ALLOCATION - 16 $200,000) 17 (LAND ALLOCATION - $5,000) 18 (DESIGN AND CONTINGENCIES - $25,000) 19 (9) WORTH TOWNSHIP, T-912, JACK ATWELL 20 ROAD BRIDGE OVER WOLF CREEK, BRIDGE 21 REPLACEMENT 297,000 22 (BASE CONSTRUCTION ALLOCATION - 23 $257,000) 24 (LAND ALLOCATION - $10,000) 25 (DESIGN AND CONTINGENCIES - $30,000) 26 (B) STATE BRIDGES 27 (1) SR 0058, SR 0058 OVER SUGAR CREEK, 28 GREENE TOWNSHIP, BRIDGE REPLACEMENT 270,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $200,000) 19970H0030B0757 - 229 -
1 (LAND ALLOCATION - $20,000) 2 (DESIGN AND CONTINGENCIES - $50,00) 3 (2) SR 0058, SR 0058 OVER TRIBUTARY OF 4 SHENANGO RIVER, GREENVILLE BOROUGH, 5 BRIDGE REPLACEMENT 250,000 6 (BASE CONSTRUCTION ALLOCATION - 7 $200,000) 8 (LAND ALLOCATION - $20,000) 9 (DESIGN AND CONTINGENCIES - $30,000) 10 (3) SR 0058, SR 0058 OVER I-79, FINDLEY 11 TOWNSHIP, BRIDGE REPLACEMENT 1,630,000 12 (BASE CONSTRUCTION ALLOCATION - 13 $1,500,000) 14 (LAND ALLOCATION - $30,000) 15 (DESIGN AND CONTINGENCIES - $100,000) 16 (4) SR 0062, SR 0062 OVER SHENANGO 17 RIVER/RIVERSIDE DRIVE, CITY OF SHARON, 18 BRIDGE REPLACEMENT 2,780,000 19 (BASE CONSTRUCTION ALLOCATION - 20 $2,500,000) 21 (LAND ALLOCATION - $30,000) 22 (DESIGN AND CONTINGENCIES - $250,000) 23 (5) SR 0158, SR 0158 OVER LITTLE 24 NESHANNOCK CREEK, WILMINGTON TOWNSHIP, 25 BRIDGE REPLACEMENT 770,000 26 (BASE CONSTRUCTION ALLOCATION - 27 $650,000) 28 (LAND ALLOCATION - $40,000) 29 (DESIGN AND CONTINGENCIES - $80,000) 30 (6) SR 0173, SR 0173 OVER MILL CREEK, NEW 19970H0030B0757 - 230 -
1 LEBANON BOROUGH, BRIDGE REPLACEMENT 430,000 2 (BASE CONSTRUCTION ALLOCATION - 3 $350,000) 4 (LAND ALLOCATION - $20,000) 5 (DESIGN AND CONTINGENCIES - $60,000) 6 (7) SR 0208, SR 0208 OVER WOLF CREEK, 7 GROVE CITY BOROUGH, BRIDGE REPLACEMENT 1,000,000 8 (BASE CONSTRUCTION ALLOCATION - 9 $870,000) 10 (LAND ALLOCATION - $30,000) 11 (DESIGN AND CONTINGENCIES - $100,000) 12 (8) SR 0258, SR 0258 OVER DALEY RUN, 13 JEFFERSON TOWNSHIP, BRIDGE REPLACEMENT 430,000 14 (BASE CONSTRUCTION ALLOCATION - 15 $350,000) 16 (LAND ALLOCATION - $20,000) 17 (DESIGN AND CONTINGENCIES - $60,000) 18 (9) SR 0318, SR 0318 OVER SHENANGO 19 RIVER/STREET/RAILROAD, WEST MIDDLESEX 20 BOROUGH, BRIDGE REPLACEMENT 4,400,000 21 (BASE CONSTRUCTION ALLOCATION - 22 $3,700,000) 23 (LAND ALLOCATION - $100,000) 24 (DESIGN AND CONTINGENCIES - $600,000) 25 (10) SR 0518, SR 0518 OVER PINE HOLLOW 26 RUN, CITY OF HERMITAGE, BRIDGE 27 REPLACEMENT 410,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $300,000) 30 (LAND ALLOCATION - $30,000) 19970H0030B0757 - 231 -
1 (DESIGN AND CONTINGENCIES - $80,000) 2 (11) SR 0846, SR 0846 OVER SHENANGO 3 RESERVOIR, SOUTH PYMATUNING TOWNSHIP, 4 BRIDGE REPLACEMENT 1,500,000 5 (BASE CONSTRUCTION ALLOCATION - 6 $1,340,000) 7 (LAND ALLOCATION - $10,000) 8 (DESIGN AND CONTINGENCIES - $150,000) 9 (12) SR 2006, SR 2006 OVER I-79, 10 SPRINGFIELD TOWNSHIP, BRIDGE 11 REPLACEMENT 1,100,000 12 (BASE CONSTRUCTION ALLOCATION - 13 $1,000,000) 14 (LAND ALLOCATION - $10,000) 15 (DESIGN AND CONTINGENCIES - $90,000) 16 (13) SR 2014, SR 2014 OVER MILL CREEK, 17 FINDLEY TOWNSHIP, BRIDGE REPLACEMENT 330,000 18 (BASE CONSTRUCTION ALLOCATION - 19 $240,000) 20 (LAND ALLOCATION - $20,000) 21 (DESIGN AND CONTINGENCIES - $70,000) 22 (14) SR 2025, SR 2025 OVER LAKE BARMORE 23 OUTLET, PINE TOWNSHIP, BRIDGE 24 REPLACEMENT 300,000 25 (BASE CONSTRUCTION ALLOCATION - 26 $230,000) 27 (LAND ALLOCATION - $10,000) 28 (DESIGN AND CONTINGENCIES - $60,000) 29 (15) SR 3011, SR 3011 OVER I-80, SHENANGO 30 TOWNSHIP, BRIDGE REPLACEMENT 810,000 19970H0030B0757 - 232 -
1 (BASE CONSTRUCTION ALLOCATION - 2 $700,000) 3 (LAND ALLOCATION - $10,000) 4 (DESIGN AND CONTINGENCIES - $100,000) 5 (16) SR 4014, SR 4014 OVER SHENANGO RIVER, 6 DELAWARE TOWNSHIP, BRIDGE REPLACEMENT 920,000 7 (BASE CONSTRUCTION ALLOCATION - 8 $800,000) 9 (LAND ALLOCATION - $20,000) 10 (DESIGN AND CONTINGENCIES - $100,000) 11 (17) SR 0518, PA 516 (WALNUT STREET) 12 BRIDGE OVER PINE HOLLOW ROAD, CITY OF 13 HERMITAGE, BRIDGE REPLACEMENT 550,000 14 (BASE CONSTRUCTION ALLOCATION - 15 $500,000) 16 (DESIGN AND CONTINGENCIES - $50,000) 17 SECTION 48. MIFFLIN COUNTY. 18 (A) LOCAL BRIDGES 19 (1) OLIVER TOWNSHIP, T-803, BRIDGE OVER 20 MUSSER RUN, BRIDGE REPLACEMENT 492,000 21 (BASE CONSTRUCTION ALLOCATION - 22 $390,000) 23 (LAND ALLOCATION - $2,000) 24 (DESIGN AND CONTINGENCIES - $100,000) 25 (2) DECATUR TOWNSHIP, T-379, BRIDGE OVER 26 MEADOW CREEK, BRIDGE REPLACEMENT 370,000 27 (BASE CONSTRUCTION ALLOCATION - 28 $300,000) 29 (LAND ALLOCATION - $10,000) 30 (DESIGN AND CONTINGENCIES - $60,000) 19970H0030B0757 - 233 -
1 (B) STATE BRIDGES 2 (1) SR 0022, BRIDGE OVER KISH CREEK, 3 LEWISTOWN BOROUGH, BRIDGE PAINTING 800,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $720,000) 6 (DESIGN AND CONTINGENCIES - $80,000) 7 (2) SR 3017, BRIDGE OVER JUNIATA RIVER, 8 WAYNE TOWNSHIP, BRIDGE PAINTING 935,000 9 (BASE CONSTRUCTION ALLOCATION - 10 $850,000) 11 (DESIGN AND CONTINGENCIES - $85,000) 12 SECTION 49. MONROE COUNTY. 13 (A) LOCAL BRIDGES 14 (1) SMITHFIELD TOWNSHIP, T-522, BRIDGE 15 OVER MARSHALLS CREEK, BRIDGE 16 REPLACEMENT 134,000 17 (BASE CONSTRUCTION ALLOCATION - 18 $116,000) 19 (LAND ALLOCATION - $6,000) 20 (DESIGN AND CONTINGENCIES - $12,000) 21 (B) STATE BRIDGES 22 (1) SR 0447, SR 0447 OVER BROADHEAD CREEK 23 AND RAILROAD, STROUD TOWNSHIP, BRIDGE 24 REHABILITATION 1,395,000 25 (BASE CONSTRUCTION ALLOCATION - 26 $1,071,000) 27 (DESIGN AND CONTINGENCIES - $324,000) 28 (2) SR 3003, SILVER SPRING BOULEVARD OVER 29 CHAPPLE CREEK, ELDRED TOWNSHIP, BRIDGE 30 REPLACEMENT 280,000 19970H0030B0757 - 234 -
1 (BASE CONSTRUCTION ALLOCATION - 2 $130,000) 3 (LAND ALLOCATION - $50,000) 4 (DESIGN AND CONTINGENCIES - $100,000) 5 (3) SR 2012, SR 2012 OVER BROADHEAD CREEK, 6 EAST STROUDSBURG BOROUGH, BRIDGE 7 REHABILITATION 1,500,000 8 (BASE CONSTRUCTION ALLOCATION - 9 $1,150,000) 10 (DESIGN AND CONTINGENCIES - $350,000) 11 (4) SR 0080, I-80 WESTBOUND OVER 12 TUNKHANNOCK CREEK AT COUNTY LINE, 13 TOBYHANNA TOWNSHIP, BRIDGE 14 REHABILITATION 935,000 15 (BASE CONSTRUCTION ALLOCATION - 16 $720,000) 17 (DESIGN AND CONTINGENCIES - $215,000) 18 (5) SR 0080, I-80 EASTBOUND OVER 19 TUNKHANNOCK CREEK AT COUNTY LINE, 20 TUNKHANNOCK TOWNSHIP, BRIDGE 21 REHABILITATION 935,000 22 (BASE CONSTRUCTION ALLOCATION - 23 $720,000) 24 (DESIGN AND CONTINGENCIES - $215,000) 25 (6) SR 4003, SR 4003 OVER LEHIGH RIVER AT 26 LACKAWANNA COUNTY LINE, COOLBAUGH 27 TOWNSHIP, BRIDGE REHABILITATION 390,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $295,000) 30 (DESIGN AND CONTINGENCIES - $95,000) 19970H0030B0757 - 235 -
1 SECTION 50. MONTGOMERY COUNTY. 2 (A) LOCAL BRIDGES 3 (1) NORRISTOWN BOROUGH, HOSPITAL BRIDGE 4 OVER STONY CREEK, BRIDGE REPLACEMENT 412,000 5 (BASE CONSTRUCTION ALLOCATION - 6 $365,000) 7 (LAND ALLOCATION - $10,000) 8 (DESIGN AND CONTINGENCIES - $37,000) 9 (2) TRAPPE BOROUGH, COLLEGE AVENUE BRIDGE 10 OVER TRIBUTARY OF PERKIOMEN CREEK, 11 BRIDGE REPLACEMENT 360,000 12 (BASE CONSTRUCTION ALLOCATION - 13 $300,000) 14 (LAND ALLOCATION - $10,000) 15 (DESIGN AND CONTINGENCIES - $50,000) 16 (3) TOWAMENCIN TOWNSHIP, BUSTARD ROAD 17 BRIDGE OVER TOWAMENCIN CREEK, BRIDGE 18 REPLACEMENT 454,000 19 (BASE CONSTRUCTION ALLOCATION - 20 $400,000) 21 (LAND ALLOCATION - $10,000) 22 (DESIGN AND CONTINGENCIES - $44,000) 23 (4) UPPER HANOVER TOWNSHIP, T-444, 24 TREICHLER ROAD BRIDGE UNDER READING 25 RAILROAD, BRIDGE REMOVAL 151,000 26 (BASE CONSTRUCTION ALLOCATION - 27 $126,000) 28 (LAND ALLOCATION - $5,000) 29 (DESIGN AND CONTINGENCIES - $20,000) 30 (5) UPPER PROVIDENCE TOWNSHIP, T-400, 19970H0030B0757 - 236 -
1 SUPIO ROAD BRIDGE UNDER READING 2 RAILROAD, BRIDGE REMOVAL 187,000 3 (BASE CONSTRUCTION ALLOCATION - 4 $157,000) 5 (LAND ALLOCATION - $5,000) 6 (DESIGN AND CONTINGENCIES - $25,000) 7 (6) UPPER SALFORD TOWNSHIP, T-444, BRIDGE 8 OVER ABANDONED RAILROAD, BRIDGE 9 REMOVAL 1,175,000 10 (BASE CONSTRUCTION ALLOCATION - 11 $1,000,000) 12 (LAND ALLOCATION - $25,000) 13 (DESIGN AND CONTINGENCIES - $150,000) 14 (7) NORRISTOWN BOROUGH, MARKLEY STREET 15 BRIDGE OVER STONEY CREEK, BRIDGE 16 REPLACEMENT 1,250,000 17 (BASE CONSTRUCTION ALLOCATION - 18 $1,000,000) 19 (LAND ALLOCATION - $50,000) 20 (DESIGN AND CONTINGENCIES - $200,000) 21 (8) NORRISTOWN BOROUGH, MARKLEY STREET 22 BRIDGE OVER STONEY CREEK, BRIDGE 23 REHABILITATION 500,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $400,000) 26 (LAND ALLOCATION - $10,000) 27 (DESIGN AND CONTINGENCIES - $90,000) 28 (9) HORSHAM TOWNSHIP, DAVIS GROVE ROAD 29 OVER PARK CREEK, BRIDGE REPLACEMENT 300,000 30 (BASE CONSTRUCTION ALLOCATION - 19970H0030B0757 - 237 -
1 $230,000) 2 (LAND ALLOCATION - $20,000) 3 (DESIGN AND CONTINGENCIES - $50,000) 4 (10) FRANCONIA TOWNSHIP, KELLER CREAMERY 5 ROAD OVER INDIAN CREEK, BRIDGE 6 REPLACEMENT 320,000 7 (BASE CONSTRUCTION ALLOCATION - 8 $250,000) 9 (LAND ALLOCATION - $20,000) 10 (DESIGN AND CONTINGENCIES - $50,000) 11 (11) EAST NORRITON TOWNSHIP, GERMANTOWN 12 PIKE OVER FIVE MILE RUN CREEK, BRIDGE 13 REPLACEMENT 500,000 14 (BASE CONSTRUCTION ALLOCATION - 15 $430,000) 16 (LAND ALLOCATION - $20,000) 17 (DESIGN AND CONTINGENCIES - $50,000) 18 (12) UPPER HANOVER TOWNSHIP, ELEVENTH 19 STREET OVER MACOBY CREEK, BRIDGE 20 REPLACEMENT 400,000 21 (BASE CONSTRUCTION ALLOCATION - 22 $340,000) 23 (LAND ALLOCATION - $20,000) 24 (DESIGN AND CONTINGENCIES - $40,000) 25 (13) LOWER MERION TOWNSHIP, BLACK ROCK 26 ROAD OVER MILL CREEK, BRIDGE 27 REPLACEMENT 350,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $295,000) 30 (LAND ALLOCATION - $20,000) 19970H0030B0757 - 238 -
1 (DESIGN AND CONTINGENCIES - $35,000) 2 (14) LOWER MERION TOWNSHIP, MORRIS ROAD 3 OVER MILL CREEK, BRIDGE REPLACEMENT 350,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $285,000) 6 (LAND ALLOCATION - $20,000) 7 (DESIGN AND CONTINGENCIES - $45,000) 8 (15) UPPER MERION TOWNSHIP, CONRAIL OVER 9 SOUTH GULPH ROAD, BRIDGE REPLACEMENT 4,500,000 10 (BASE CONSTRUCTION ALLOCATION - 11 $4,250,000) 12 (LAND ALLOCATION - $50,000) 13 (DESIGN AND CONTINGENCIES - $200,000) 14 (16) TRAPPE BOROUGH, COLLEGE AVENUE OVER 15 BUCKWALTER TRIBUTARY, BRIDGE 16 REPLACEMENT 140,000 17 (BASE CONSTRUCTION ALLOCATION - 18 $120,000) 19 (DESIGN AND CONTINGENCIES - $20,000) 20 (B) STATE BRIDGES 21 (1) SR 2009, BYBERRY ROAD BRIDGE OVER 22 SOUTHAMPTON CREEK, UPPER MORELAND 23 TOWNSHIP AND BRYN ATHYN BOROUGH, 24 HISTORIC BRIDGE REPLACEMENT 680,000 25 (BASE CONSTRUCTION ALLOCATION - 26 $500,000) 27 (LAND ALLOCATION - $20,000) 28 (DESIGN AND CONTINGENCIES - $160,000) 29 (2) SR 2018, BETHLEHEM PIKE BRIDGE OVER 30 BRANCH OF WISSAHICKON CREEK, 19970H0030B0757 - 239 -
1 SPRINGFIELD TOWNSHIP, BRIDGE 2 REHABILITATION 525,000 3 (BASE CONSTRUCTION ALLOCATION - 4 $400,000) 5 (LAND ALLOCATION - $25,000) 6 (DESIGN AND CONTINGENCIES - $100,000) 7 (3) SR 4030, NEW HANOVER SQUARE ROAD 8 BRIDGE OVER WEST SWAMP CREEK (TWO 9 BRIDGES), NEW HANOVER TOWNSHIP, BRIDGE 10 REPLACEMENT 1,150,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $900,000) 13 (LAND ALLOCATION - $50,000) 14 (DESIGN AND CONTINGENCIES - $200,000) 15 (4) SR 0100, EXTENDED, (THREE BRIDGES), 16 HIGH STREET TO FARMINGTON ROAD, 17 POTTSTOWN BOROUGH AND UPPER POTTSGROVE 18 TOWNSHIP, BRIDGE REHABILITATION 1,650,000 19 (BASE CONSTRUCTION ALLOCATION - 20 $1,500,000) 21 (LAND ALLOCATION - $50,000) 22 (DESIGN AND CONTINGENCIES - $100,000) 23 (5) SR 1017, SALFORDVILLE ROAD BRIDGE OVER 24 EAST BRANCH OF PERKIOMEN CREEK, LOWER 25 SALFORD TOWNSHIP, BRIDGE REPLACEMENT 1,500,000 26 (BASE CONSTRUCTION ALLOCATION - 27 $1,250,000) 28 (LAND ALLOCATION - $50,000) 29 (DESIGN AND CONTINGENCIES - $200,000) 30 (6) SR 1024, SALFORD STATION (TWO BRIDGES) 19970H0030B0757 - 240 -
1 OVER PERKIOMEN CREEK, UPPER SALFORD AND 2 LOWER FREDRICK TOWNSHIPS, BRIDGE 3 REPLACEMENT 1,200,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $1,000,000) 6 (LAND ALLOCATION - $50,000) 7 (DESIGN AND CONTINGENCIES - $150,000) 8 (7) SR 3020, DANNEHOWER BRIDGE OVER RIVER 9 AND NEW US 202, UPPER MERION TOWNSHIP, 10 BRIDGEPORT AND NORRISTOWN BOROUGHS, 11 BRIDGE PAINTING 872,000 12 (BASE CONSTRUCTION ALLOCATION - 13 $802,000) 14 (DESIGN AND CONTINGENCIES - $70,000) 15 (8) SR 3039, SOUTH GULPH ROAD OVERPASS 16 UNDER CONRAIL, UPPER MERION TOWNSHIP, 17 BRIDGE REPLACEMENT 1,500,000 18 (BASE CONSTRUCTION ALLOCATION - 19 $1,300,000) 20 (LAND ALLOCATION - $50,000) 21 (DESIGN AND CONTINGENCIES - $150,000) 22 (9) SR 4003, BLACK ROCK ROAD BRIDGE OVER 23 ABANDONED READING TRACK, UPPER 24 PROVIDENCE TOWNSHIP, BRIDGE REMOVAL 205,000 25 (BASE CONSTRUCTION ALLOCATION - 26 $175,000) 27 (LAND ALLOCATION - $10,000) 28 (DESIGN AND CONTINGENCIES - $20,000) 29 (10) SR 4012, GRATERFORD ROAD BRIDGE OVER 30 PERKIOMEN CREEK, SKIPPACK AND PERKIOMEN 19970H0030B0757 - 241 -
1 TOWNSHIPS, BRIDGE REPLACEMENT 1,475,000 2 (BASE CONSTRUCTION ALLOCATION - 3 $1,300,000) 4 (LAND ALLOCATION - $50,000) 5 (DESIGN AND CONTINGENCIES - $125,000) 6 (11) SR 4031, RIDGE PIKE BRIDGE OVER 7 MANATAWNY CREEK, POTTSTOWN BOROUGH, 8 BRIDGE REPLACEMENT 2,053,000 9 (BASE CONSTRUCTION ALLOCATION - 10 $1,935,000) 11 (LAND ALLOCATION - $45,000) 12 (DESIGN AND CONTINGENCIES - $73,000) 13 SECTION 51. MONTOUR COUNTY. 14 (A) LOCAL BRIDGES 15 (1) DERRY TOWNSHIP, T-407, COUNTY BRIDGE 16 NO.13 OVER WEST BRANCH OF CHILLISQUAQUE 17 CREEK NEAR WASHINGTONVILLE BOROUGH, 18 BRIDGE REPLACEMENT 350,000 19 (BASE CONSTRUCTION ALLOCATION - 20 $265,000) 21 (LAND ALLOCATION - $35,000) 22 (DESIGN AND CONTINGENCIES - $50,000) 23 (B) STATE BRIDGES 24 (1) SR 1004, BRIDGE OVER CHILLISQUAQUE 25 CREEK, NORTH OF WASHINGTONVILLE 26 BOROUGH, BRIDGE REPLACEMENT 620,000 27 (BASE CONSTRUCTION ALLOCATION - 28 $500,000) 29 (LAND ALLOCATION - $40,000) 30 (DESIGN AND CONTINGENCIES - $80,000) 19970H0030B0757 - 242 -
1 (2) SR 1006, BRIDGE OVER BRANCH OF 2 CHILLISQUAQUE CREEK, 3 MILES NORTHWEST 3 OF WASHINGTONVILLE BOROUGH, BRIDGE 4 REPLACEMENT 510,000 5 (BASE CONSTRUCTION ALLOCATION - 6 $410,000) 7 (LAND ALLOCATION - $25,000) 8 (DESIGN AND CONTINGENCIES - $80,000) 9 (3) SR 3004, BRIDGE OVER BEAVER RUN, 2 10 MILES WEST OF MORESBURG, BRIDGE 11 REPLACEMENT 285,000 12 (BASE CONSTRUCTION ALLOCATION - 13 $227,000) 14 (LAND ALLOCATION - $14,000) 15 (DESIGN AND CONTINGENCIES - $44,000) 16 (4) SR 4001, BRIDGE OVER CHILLISQUAQUE 17 CREEK, ANTHONY TOWNSHIP, BRIDGE 18 REPLACEMENT 458,000 19 (BASE CONSTRUCTION ALLOCATION - 20 $366,000) 21 (LAND ALLOCATION - $23,000) 22 (DESIGN AND CONTINGENCIES - $69,000) 23 (5) SR 0011, SR 0011 OVER SECHLER RUN, 24 MAHONING TOWNSHIP, BRIDGE REPLACEMENT 582,000 25 (BASE CONSTRUCTION ALLOCATION - 26 $466,000) 27 (LAND ALLOCATION - $29,000) 28 (DESIGN AND CONTINGENCIES - $87,000) 29 (6) SR 0054, SR 0054 OVER CHILLISQUAQUE 30 CREEK, ANTHONY TOWNSHIP, BRIDGE 19970H0030B0757 - 243 -
1 REPLACEMENT 547,000 2 (BASE CONSTRUCTION ALLOCATION - 3 $438,000) 4 (LAND ALLOCATION - $27,000) 5 (DESIGN AND CONTINGENCIES - $82,000) 6 (7) SR 0642, SR 0642 OVER MAHONING CREEK, 7 WEST HEMLOCK TOWNSHIP, BRIDGE 8 REPLACEMENT 213,000 9 (BASE CONSTRUCTION ALLOCATION - 10 $170,000) 11 (LAND ALLOCATION - $11,000) 12 (DESIGN AND CONTINGENCIES - $32,000) 13 (8) SR 1009, SR 1009 OVER BRANCH OF LOWRY 14 RUN, ANTHONY TOWNSHIP, BRIDGE 15 REPLACEMENT 431,000 16 (BASE CONSTRUCTION ALLOCATION - 17 $345,000) 18 (LAND ALLOCATION - $21,000) 19 (DESIGN AND CONTINGENCIES - $65,000) 20 (9) SR 1011, SR 1011 OVER TRIBUTARY OF 21 CHILLISQUAQUE CREEK, ANTHONY TOWNSHIP, 22 BRIDGE REPLACEMENT 212,000 23 (BASE CONSTRUCTION ALLOCATION - 24 $170,000) 25 (LAND ALLOCATION - $11,000) 26 (DESIGN AND CONTINGENCIES - $31,000) 27 SECTION 52. NORTHAMPTON COUNTY. 28 (A) LOCAL BRIDGES 29 (1) LEHIGH TOWNSHIP, INDIANTRAIL ROAD 30 BRIDGE OVER INDIAN CREEK, BRIDGE 19970H0030B0757 - 244 -
1 PAINTING 16,000 2 (BASE CONSTRUCTION ALLOCATION - 3 $14,000) 4 (DESIGN AND CONTINGENCIES - $2,000) 5 (2) LEHIGH TOWNSHIP, T-548, BRIDGE OVER 6 BERTSCH CREEK, BRIDGE REPLACEMENT 400,000 7 (BASE CONSTRUCTION ALLOCATION - 8 $300,000) 9 (LAND ALLOCATION - $20,000) 10 (DESIGN AND CONTINGENCIES - $80,000) 11 (3) LEHIGH TOWNSHIP, WOOD DRIVE BRIDGE, 12 BRIDGE REPLACEMENT 65,000 13 (BASE CONSTRUCTION ALLOCATION - 14 $41,000) 15 (LAND ALLOCATION - $4,000) 16 (DESIGN AND CONTINGENCIES - $20,000) 17 (4) FREEMANSBURG BOROUGH, LVRR BRIDGE OVER 18 MAIN STREET, BRIDGE REMOVAL 898,000 19 (BASE CONSTRUCTION ALLOCATION - 20 $694,000) 21 (LAND ALLOCATION - $100,000) 22 (DESIGN AND CONTINGENCIES - $104,000) 23 (B) STATE BRIDGES 24 (1) SR 2017, TATAMY ROAD OVER TRIBUTARY OF 25 BUSHKILL CREEK, PALMER TOWNSHIP, BRIDGE 26 REHABILITATION 240,000 27 (BASE CONSTRUCTION ALLOCATION - 28 $100,000) 29 (LAND ALLOCATION - $40,000) 30 (DESIGN AND CONTINGENCIES - $100,000) 19970H0030B0757 - 245 -
1 (2) SR 4020, MAPLE DRIVE OVER TRIBUTARY OF 2 BERTSCH CREEK, LEHIGH TOWNSHIP, BRIDGE 3 REHABILITATION 465,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $275,000) 6 (LAND ALLOCATION - $80,000) 7 (DESIGN AND CONTINGENCIES - $110,000) 8 SECTION 53. NORTHUMBERLAND COUNTY. 9 (A) LOCAL BRIDGES 10 (1) BOROUGH OF MILTON, RIDGE AVENUE OVER 11 LIMESTONE RUN, BRIDGE REPLACEMENT 520,000 12 (BASE CONSTRUCTION ALLOCATION - 13 $380,000) 14 (LAND ALLOCATION - $20,000) 15 (DESIGN AND CONTINGENCIES - $120,000) 16 (2) LEWIS TOWNSHIP, T-631, OLD STATE ROAD 17 BRIDGE OVER BRANCH OF BEAVER RUN, 18 BRIDGE REPLACEMENT 220,000 19 (BASE CONSTRUCTION ALLOCATION - 20 $200,000) 21 (DESIGN AND CONTINGENCIES - $20,000) 22 (B) STATE BRIDGES 23 (1) SR 0642, CHILLISQUAQUE CREEK BRIDGE 24 OVER CHILLISQUAQUE CREEK, 0.5 MILE EAST 25 OF POTTSGROVE, BRIDGE DECK REPLACEMENT 1,184,000 26 (BASE CONSTRUCTION ALLOCATION - 27 $947,000) 28 (LAND ALLOCATION - $59,000) 29 (DESIGN AND CONTINGENCIES - $178,000) 30 (2) SR 1005, DELAWARE RUN BRIDGE OVER 19970H0030B0757 - 246 -
1 DELAWARE RUN, 3 MILES NORTH OF 2 WATSONTOWN BOROUGH, BRIDGE REPLACEMENT 509,000 3 (BASE CONSTRUCTION ALLOCATION - 4 $408,000) 5 (LAND ALLOCATION - $25,000) 6 (DESIGN AND CONTINGENCIES - $76,000) 7 (3) SR 0045, BRIDGE OVER CHILLISQUAQUE 8 CREEK, EAST OF SR 0147, BRIDGE 9 PAINTING 260,000 10 (BASE CONSTRUCTION ALLOCATION - 11 $250,000) 12 (DESIGN AND CONTINGENCIES - $10,000) 13 (4) SR 0054, SR 0054 OVER NORTH BRANCH OF 14 SHAMOKIN CREEK, MT. CARMEL TOWNSHIP, 15 BRIDGE REPLACEMENT 721,000 16 (BASE CONSTRUCTION ALLOCATION - 17 $577,000) 18 (LAND ALLOCATION - $36,000) 19 (DESIGN AND CONTINGENCIES - $108,000) 20 (5) SR 2001, SR 2001 OVER LITTLE ROARING 21 CREEK, RUSH TOWNSHIP, BRIDGE 22 REPLACEMENT 415,000 23 (BASE CONSTRUCTION ALLOCATION - 24 $335,000) 25 (LAND ALLOCATION - $20,000) 26 (DESIGN AND CONTINGENCIES - $60,000) 27 (6) SR 2023, SR 2023 OVER CONRAIL, MT. 28 CARMEL TOWNSHIP, BRIDGE REPLACEMENT 1,275,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $1,020,000) 19970H0030B0757 - 247 -
1 (LAND ALLOCATION - $64,000) 2 (DESIGN AND CONTINGENCIES - $191,000) 3 (7) SR 4013, SR 4013 OVER PLUM CREEK, 4 ROCKEFELLER TOWNSHIP, BRIDGE 5 REPLACEMENT 361,000 6 (BASE CONSTRUCTION ALLOCATION - 7 $289,000) 8 (LAND ALLOCATION - $18,000) 9 (DESIGN AND CONTINGENCIES - $54,000) 10 SECTION 54. PERRY COUNTY. 11 (A) LOCAL BRIDGES 12 (1) TYRONE TOWNSHIP, COUNTY BRIDGE NO.4, 13 RICES BRIDGE OVER SHERMANS CREEK, 14 COVERED BRIDGE REPLACEMENT 768,000 15 (BASE CONSTRUCTION ALLOCATION - 16 $552,000) 17 (LAND ALLOCATION - $77,000) 18 (DESIGN AND CONTINGENCIES - $139,000) 19 (2) NORTHEAST MADISON TOWNSHIP, T-403 OVER 20 BIXLER RUN, BRIDGE REPLACEMENT 585,000 21 (BASE CONSTRUCTION ALLOCATION - 22 $400,000) 23 (LAND ALLOCATION - $10,000) 24 (DESIGN AND CONTINGENCIES - $175,000) 25 (3) TYRONE TOWNSHIP, RICES BRIDGE (COUNTY 26 BRIDGE NO.4) OVER SHERMANS CREEK, 27 BRIDGE REPLACEMENT 768,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $552,000) 30 (LAND ALLOCATION - $77,000) 19970H0030B0757 - 248 -
1 (DESIGN AND CONTINGENCIES - $139,000) 2 (B) STATE BRIDGES 3 (1) SR 4006, RACCOON CREEK BRIDGE OVER 4 RACCOON CREEK, TUSCARORA TOWNSHIP, 5 BRIDGE REPLACEMENT 466,000 6 (BASE CONSTRUCTION ALLOCATION - 7 $288,000) 8 (LAND ALLOCATION - $20,000) 9 (DESIGN AND CONTINGENCIES - $158,000) 10 (2) SR 3002, HORSE VALLEY ROAD BRIDGES 11 (TWO BRIDGES) OVER HORSE VALLEY RUN, 12 TOBOYNE TOWNSHIP, BRIDGE REPLACEMENT 725,000 13 (BASE CONSTRUCTION ALLOCATION - 14 $700,000) 15 (LAND ALLOCATION - $5,000) 16 (DESIGN AND CONTINGENCIES - $20,000) 17 SECTION 55. PHILADELPHIA COUNTY. 18 (A) LOCAL BRIDGES 19 (1) CITY OF PHILADELPHIA, BYBERRY ROAD 20 BRIDGE OVER CONRAIL, TEMPORARY BRIDGE 21 CONSTRUCTION 511,000 22 (BASE CONSTRUCTION ALLOCATION - 23 $390,000) 24 (LAND ALLOCATION - $51,000) 25 (DESIGN AND CONTINGENCIES - $70,000) 26 (2) CITY OF PHILADELPHIA, WYOMING AVENUE 27 BRIDGE OVER FORMER COURSE FRANKFORD 28 CREEK, WEST OF CASTOR AVENUE, BRIDGE 29 REPLACEMENT 1,300,000 30 (BASE CONSTRUCTION ALLOCATION - 19970H0030B0757 - 249 -
1 $1,200,000) 2 (DESIGN AND CONTINGENCIES - $100,000) 3 (3) CITY OF PHILADELPHIA, CHELTEN AVENUE 4 BRIDGE OVER SEPTA, WEST OF WAYNE 5 AVENUE, BRIDGE REPLACEMENT 2,300,000 6 (BASE CONSTRUCTION ALLOCATION - 7 $2,100,000) 8 (DESIGN AND CONTINGENCIES - $200,000) 9 (4) CITY OF PHILADELPHIA, FISHER'S LANE 10 BRIDGE OVER TACONY CREEK, WEST OF 11 RAMONA AVENUE, BRIDGE REPLACEMENT 1,625,000 12 (BASE CONSTRUCTION ALLOCATION - 13 $1,400,000) 14 (DESIGN AND CONTINGENCIES - $225,000) 15 (5) CITY OF PHILADELPHIA, KINGSESSING 16 AVENUE BRIDGE OVER SEPTA, BRIDGE 17 REPLACEMENT 2,550,000 18 (BASE CONSTRUCTION ALLOCATION - 19 $2,200,000) 20 (LAND ALLOCATION - $100,000) 21 (DESIGN AND CONTINGENCIES - $250,000) 22 (6) CITY OF PHILADELPHIA, MONTGOMERY 23 BRIDGE OVER AMTRAK, BRIDGE REPLACEMENT 5,275,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $4,750,000) 26 (LAND ALLOCATION - $125,000) 27 (DESIGN AND CONTINGENCIES - $400,000) 28 (7) CITY OF PHILADELPHIA, THOMAS AVENUE 29 BRIDGE OVER SEPTA, BRIDGE REPLACEMENT 3,150,000 30 (BASE CONSTRUCTION ALLOCATION - 19970H0030B0757 - 250 -
1 $2,750,000) 2 (LAND ALLOCATION - $100,000) 3 (DESIGN AND CONTINGENCIES - $300,000) 4 (8) CITY OF PHILADELPHIA, SEDGLEY AVENUE 5 BRIDGE OVER CONRAIL, BRIDGE 6 REPLACEMENT 1,000,000 7 (BASE CONSTRUCTION ALLOCATION - 8 $800,000) 9 (LAND ALLOCATION - $100,000) 10 (DESIGN AND CONTINGENCIES - $100,000) 11 (9) CITY OF PHILADELPHIA, LEXINGTON AVENUE 12 BRIDGE OVER CONRAIL, BRIDGE 13 REPLACEMENT 420,000 14 (BASE CONSTRUCTION ALLOCATION - 15 $360,000) 16 (LAND ALLOCATION - $20,000) 17 (DESIGN AND CONTINGENCIES - $40,000) 18 (10) CITY OF PHILADELPHIA, GREENLAND 19 BRIDGE OVER CONRAIL AND I-76, BRIDGE 20 REPLACEMENT 1,350,000 21 (BASE CONSTRUCTION ALLOCATION - 22 $1,100,000) 23 (LAND ALLOCATION - $100,000) 24 (DESIGN AND CONTINGENCIES - $150,000) 25 (11) CITY OF PHILADELPHIA, GLENWOOD DRIVE 26 BRIDGE OVER CONRAIL, BRIDGE 27 REPLACEMENT 1,450,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $1,200,000) 30 (LAND ALLOCATION - $100,000) 19970H0030B0757 - 251 -
1 (DESIGN AND CONTINGENCIES - $150,000) 2 (12) CITY OF PHILADELPHIA, SECOND STREET 3 BRIDGE OVER CONRAIL, BRIDGE 4 REPLACEMENT 740,000 5 (BASE CONSTRUCTION ALLOCATION - 6 $650,000) 7 (LAND ALLOCATION - $20,000) 8 (DESIGN AND CONTINGENCIES - $70,000) 9 (13) CITY OF PHILADELPHIA, CAMBRIA STREET 10 BRIDGE OVER CONRAIL, BRIDGE 11 REPLACEMENT 2,750,000 12 (BASE CONSTRUCTION ALLOCATION - 13 $2,400,000) 14 (LAND ALLOCATION - $100,000) 15 (DESIGN AND CONTINGENCIES - $250,000) 16 (B) STATE BRIDGES 17 (1) SR 4007, GERMANTOWN AVENUE BRIDGE, 18 CONRAIL OVERPASS, CITY OF PHILADELPHIA, 19 BRIDGE REMOVAL 125,000 20 (BASE CONSTRUCTION ALLOCATION - 21 $100,000) 22 (LAND ALLOCATION - $10,000) 23 (DESIGN AND CONTINGENCIES - $15,000) 24 (2) SR 0076, SCHUYLKILL EXPRESSWAY BRIDGE 25 OVER SCHUYLKILL RIVER, CITY OF 26 PHILADELPHIA, BRIDGE PAINTING 2,580,000 27 (BASE CONSTRUCTION ALLOCATION - 28 $2,390,000) 29 (DESIGN AND CONTINGENCIES - $190,000) 30 (3) SR 2003, 5TH STREET BRIDGE OVER 19970H0030B0757 - 252 -
1 AMTRAK, CITY OF PHILADELPHIA, BRIDGE 2 REPLACEMENT 2,400,000 3 (BASE CONSTRUCTION ALLOCATION - 4 $2,000,000) 5 (LAND ALLOCATION - $200,000) 6 (DESIGN AND CONTINGENCIES - $200,000) 7 (4) SR 3008, CHESTNUT STREET BRIDGE OVER 8 SCHUYLKILL RIVER, CITY OF PHILADELPHIA, 9 BRIDGE PAINTING 477,000 10 (BASE CONSTRUCTION ALLOCATION - 11 $426,000) 12 (DESIGN AND CONTINGENCIES - $51,000) 13 (5) SR 3037, JFK BOULEVARD BRIDGE OVER 14 SCHUYLKILL RIVER, CITY OF PHILADELPHIA, 15 BRIDGE PAINTING 857,000 16 (BASE CONSTRUCTION ALLOCATION - 17 $794,000) 18 (DESIGN AND CONTINGENCIES - $63,000) 19 (6) SR 0095, DELAWARE RIVER EXPRESSWAY 20 OVER WESTMORELAND AND TIOGA STREETS, 21 CITY OF PHILADELPHIA, BRIDGE 22 REHABILITATION 4,450,000 23 (BASE CONSTRUCTION ALLOCATION - 24 $4,200,000) 25 (LAND ALLOCATION - $50,000) 26 (DESIGN AND CONTINGENCIES - $200,000) 27 SECTION 56. PIKE COUNTY. 28 (A) LOCAL BRIDGES (RESERVED) 29 (B) STATE BRIDGES 30 (1) SR 0390, BRIDGE KILL CREEK BRIDGE, 19970H0030B0757 - 253 -
1 NORTH OF SR 3002, GREEN TOWNSHIP, 2 BRIDGE REPLACEMENT 430,000 3 (BASE CONSTRUCTION ALLOCATION - 4 $340,000) 5 (LAND ALLOCATION - $10,000) 6 (DESIGN AND CONTINGENCIES - $80,000) 7 (2) SR 2011, BRIDGE OVER OUTLET TO SAWKILL 8 POND, SOUTH OF TR 6, DINGMAN TOWNSHIP, 9 BRIDGE REPLACEMENT 355,000 10 (BASE CONSTRUCTION ALLOCATION - 11 $275,000) 12 (LAND ALLOCATION - $10,000) 13 (DESIGN AND CONTINGENCIES - $70,000) 14 (3) SR 0434, SHOHOLA BRIDGE OVER DELAWARE 15 RIVER, SHOHOLA TOWNSHIP AND NEW YORK 16 STATE LINE, BRIDGE PAINTING 2,200,000 17 (BASE CONSTRUCTION ALLOCATION - 18 $2,000,000) 19 (DESIGN AND CONTINGENCIES - $200,000) 20 (4) STATE BRIDGES, COUNTYWIDE BRIDGE ZONE 21 PAINTING, BRIDGE PAINTING 370,000 22 (BASE CONSTRUCTION ALLOCATION - 23 $350,000) 24 (LAND ALLOCATION - $10,000) 25 (DESIGN AND CONTINGENCIES - $10,000) 26 SECTION 57. POTTER COUNTY (RESERVED). 27 SECTION 58. SCHUYLKILL COUNTY. 28 (A) LOCAL BRIDGES 29 (1) CITY OF POTTSVILLE, WASHINGTON STREET 30 BRIDGE NO.2 OVER CONRAIL AND PA 61, 19970H0030B0757 - 254 -
1 BRIDGE REPLACEMENT 2,225,000 2 (BASE CONSTRUCTION ALLOCATION - 3 $2,000,000) 4 (LAND ALLOCATION - $25,000) 5 (DESIGN AND CONTINGENCIES - $200,000) 6 (2) PINE GROVE TOWNSHIP, PENN CENTRAL 7 BRIDGE OVER T-390, BRIDGE REMOVAL 551,000 8 (BASE CONSTRUCTION ALLOCATION - 9 $435,000) 10 (LAND ALLOCATION - $50,000) 11 (DESIGN AND CONTINGENCIES - $66,000) 12 (3) RUSH TOWNSHIP, T-862, BRIDGE NO.42 13 OVER PINE CREEK, BRIDGE REPLACEMENT 139,000 14 (BASE CONSTRUCTION ALLOCATION - 15 $121,000) 16 (LAND ALLOCATION - $6,000) 17 (DESIGN AND CONTINGENCIES - $12,000) 18 (4) ST. CLAIR BOROUGH, RUSSELL STREET 19 BRIDGE OVER MILL CREEK, BRIDGE 20 REPLACEMENT 223,000 21 (BASE CONSTRUCTION ALLOCATION - 22 $193,000) 23 (LAND ALLOCATION - $10,000) 24 (DESIGN AND CONTINGENCIES - $20,000) 25 (5) UPPER MAHANTONGO TOWNSHIP, T-473, 26 BRIDGE OVER MAHANTONGO CREEK, BRIDGE 27 REPLACEMENT 202,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $175,000) 30 (LAND ALLOCATION - $9,000) 19970H0030B0757 - 255 -
1 (DESIGN AND CONTINGENCIES - $18,000) 2 (B) STATE BRIDGES 3 (1) SR 0054, SR 0054 OVER MAHANOY CREEK, 4 MAHANOY TOWNSHIP, BRIDGE REPLACEMENT 1,005,000 5 (BASE CONSTRUCTION ALLOCATION - 6 $770,000) 7 (DESIGN AND CONTINGENCIES - $235,000) 8 (2) SR 0054, SR 0054 OVER READING BLUE 9 MOUNTAIN AND NORTHERN RAILROAD, MAHANOY 10 TOWNSHIP, BRIDGE REHABILITATION 650,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $500,000) 13 (DESIGN AND CONTINGENCIES - $150,000) 14 (3) SR 0081, SR 0081 SOUTHBOUND OVER 15 SWATARA CREEK, PINE GROVE TOWNSHIP, 16 BRIDGE REHABILITATION 970,000 17 (BASE CONSTRUCTION ALLOCATION - 18 $745,000) 19 (DESIGN AND CONTINGENCIES - $225,000) 20 (4) SR 0081, SR 0081 NORTHBOUND OVER 21 SWATARA CREEK, PINE GROVE TOWNSHIP, 22 BRIDGE REHABILITATION 970,000 23 (BASE CONSTRUCTION ALLOCATION - 24 $745,000) 25 (DESIGN AND CONTINGENCIES - $225,000) 26 (5) SR 0081, SR 0081 SOUTHBOUND OVER SR 27 0443 AND EXIT RAMP 3, PINE GROVE 28 TOWNSHIP, BRIDGE REHABILITATION 715,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $550,000) 19970H0030B0757 - 256 -
1 (DESIGN AND CONTINGENCIES - $165,000) 2 (6) SR 0081, SR 0081 NORTHBOUND OVER SR 3 0443 AND EXIT RAMP 31, PINE GROVE 4 TOWNSHIP, BRIDGE REHABILITATION 515,000 5 (BASE CONSTRUCTION ALLOCATION - 6 $390,000) 7 (DESIGN AND CONTINGENCIES - $125,000) 8 (7) SR 0081, I-81 SOUTHBOUND OVER T-886, 9 OAK GROVE ROAD, PINE GROVE TOWNSHIP, 10 BRIDGE REHABILITATION 300,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $200,000) 13 (DESIGN AND CONTINGENCIES - $100,000) 14 (8) SR 0081, I-81 NORTHBOUND OVER T-886, 15 OAK GROVE ROAD, PINE GROVE TOWNSHIP, 16 BRIDGE REHABILITATION 300,000 17 (BASE CONSTRUCTION ALLOCATION - 18 $200,000) 19 (DESIGN AND CONTINGENCIES - $100,000) 20 (9) SR 0061, BRIDGE OVER MAHANNON CREEK AT 21 SOUTH LIBERTY STREET, NORTH MANHEIM 22 TOWNSHIP, BRIDGE REHABILITATION 265,000 23 (BASE CONSTRUCTION ALLOCATION - 24 $175,000) 25 (DESIGN AND CONTINGENCIES - $90,000) 26 (10) SR 0895, SR 0895 OVER LIZARD CREEK, 27 VILLAGE OF SNYDERS, WEST PENN TOWNSHIP, 28 BRIDGE REHABILITATION 290,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $190,000) 19970H0030B0757 - 257 -
1 (DESIGN AND CONTINGENCIES - $100,000) 2 (11) SR 0901, SR 0901 OVER MAHANOY CREEK, 3 BRIDGE REHABILITATION 680,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $520,000) 6 (DESIGN AND CONTINGENCIES - $160,000) 7 (12) SR 1011, SR 1011 OVER BIG CREEK, 8 VILLAGE OF BROCKTON, SCHUYLKILL 9 TOWNSHIP, BRIDGE REPLACEMENT 340,000 10 (BASE CONSTRUCTION ALLOCATION - 11 $160,000) 12 (LAND ALLOCATION - $55,000) 13 (DESIGN AND CONTINGENCIES - $125,000) 14 (13) SR 1011, SR 1011 OVER LOCUST CREEK, 15 RYAN TOWNSHIP, BRIDGE REHABILITATION 365,000 16 (BASE CONSTRUCTION ALLOCATION - 17 $180,000) 18 (LAND ALLOCATION - $60,000) 19 (DESIGN AND CONTINGENCIES - $125,000) 20 (14) SR 2018, SR 2018 OVER LITTLE 21 SCHUYLKILL RIVER, DREHERSVILLE, EAST 22 BRUNSWICK TOWNSHIP, BRIDGE 23 REHABILITATION 385,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $285,000) 26 (DESIGN AND CONTINGENCIES - $100,000) 27 (15) SR 4013, SR 4013 OVER RAUSCH CREEK, 28 HEGINS TOWNSHIP, BRIDGE REHABILITATION 280,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $180,000) 19970H0030B0757 - 258 -
1 (DESIGN AND CONTINGENCIES - $100,000) 2 (16) SR 4022, SR 4022 OVER TRIBUTARY OF 3 MAHANTANGO CREEK, ELDRED TOWNSHIP, 4 BRIDGE REPLACEMENT 310,000 5 (BASE CONSTRUCTION ALLOCATION - 6 $150,000) 7 (LAND ALLOCATION - $50,000) 8 (DESIGN AND CONTINGENCIES - $110,000) 9 (17) SR 0209, BROAD STREET OVER LITTLE 10 SCHUYLKILL RIVER, TAMAQUA BOROUGH, 11 BRIDGE REPLACEMENT 600,000 12 (BASE CONSTRUCTION ALLOCATION - 13 $360,000) 14 (LAND ALLOCATION - $100,000) 15 (DESIGN AND CONTINGENCIES - $140,000) 16 (18) SR 4022, BROAD STREET BRIDGE OVER 17 PANTHER CREEK, TAMAQUA BOROUGH, BRIDGE 18 REPLACEMENT 1,780,000 19 (BASE CONSTRUCTION ALLOCATION - 20 $1,220,000) 21 (LAND ALLOCATION - $195,000) 22 (DESIGN AND CONTINGENCIES - $365,000) 23 (19) SR 4022, SR 4022 OVER MAHANOY CREEK, 24 VILLAGE OF HELFENSTEIN, ELDRED 25 TOWNSHIP, BRIDGE REPLACEMENT 1,170,000 26 (BASE CONSTRUCTION ALLOCATION - 27 $750,000) 28 (LAND ALLOCATION - $195,000) 29 (DESIGN AND CONTINGENCIES - $225,000) 30 (20) SR 0339, SR 0339 OVER CATAWISSA 19970H0030B0757 - 259 -
1 CREEK, NORTH UNION TOWNSHIP, BRIDGE 2 REPLACEMENT 984,000 3 (BASE CONSTRUCTION ALLOCATION - 4 $630,000) 5 (LAND ALLOCATION - $165,000) 6 (DESIGN AND CONTINGENCIES - $189,000) 7 (21) SR 0443, DOCK STREET BRIDGE OVER 8 TRIBUTARY OF SCHUYLKILL RIVER, BOROUGH 9 OF SCHUYLKILL HAVEN, BRIDGE 10 REPLACEMENT 325,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $150,000) 13 (LAND ALLOCATION - $50,000) 14 (DESIGN AND CONTINGENCIES - $125,000) 15 (22) SR 0895, SR 0895 OVER SCHUYLKILL 16 RIVER, BRIDGE REPLACEMENT 2,370,000 17 (BASE CONSTRUCTION ALLOCATION - 18 $1,480,000) 19 (LAND ALLOCATION - $390,000) 20 (DESIGN AND CONTINGENCIES - $500,000) 21 (23) SR 4011, SR 4011 OVER PINE CREEK, 22 HEGINS TOWNSHIP, BRIDGE REPLACEMENT 720,000 23 (BASE CONSTRUCTION ALLOCATION - 24 $450,000) 25 (LAND ALLOCATION - $120,000) 26 (DESIGN AND CONTINGENCIES - $150,000) 27 (24) SR 0895, AUBURN ARCH OVER SCHUYLKILL 28 RIVER, SOUTH MANHEIM TOWNSHIP, BRIDGE 29 REPLACEMENT 550,000 30 (BASE CONSTRUCTION ALLOCATION - 19970H0030B0757 - 260 -
1 $350,000) 2 (LAND ALLOCATION - $50,000) 3 (DESIGN AND CONTINGENCIES - $150,000) 4 SECTION 59. SNYDER COUNTY. 5 (A) LOCAL BRIDGES (RESERVED) 6 (B) STATE BRIDGES 7 (1) SR 1011, PINE STREET BRIDGE OVER PENNS 8 CREEK, SELINSGROVE, BRIDGE 9 REHABILITATION 1,150,000 10 (BASE CONSTRUCTION ALLOCATION - 11 $940,000) 12 (LAND ALLOCATION - $10,000) 13 (DESIGN AND CONTINGENCIES - $200,000) 14 (2) SR 3002, BRIDGE OVER MAHANTANGO CREEK, 15 1.5 MILES SOUTH OF MEISERVILLE, PERRY 16 AND CHAPMAN TOWNSHIPS LINE, BRIDGE 17 REHABILITATION 1,425,000 18 (BASE CONSTRUCTION ALLOCATION - 19 $1,211,000) 20 (DESIGN AND CONTINGENCIES - $214,000) 21 (3) SR 4007, MIDDLE CREEK BRIDGE OVER 22 MIDDLE CREEK, NORTH OF SR 0522 AND 23 SOUTH OF SR 4012, BRIDGE REPLACEMENT 1,158,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $926,000) 26 (LAND ALLOCATION - $58,000) 27 (DESIGN AND CONTINGENCIES - $174,000) 28 (4) SR 0522, BRIDGE OVER MIDDLE CREEK, 29 BRIDGE PAINTING 180,000 30 (BASE CONSTRUCTION ALLOCATION - 19970H0030B0757 - 261 -
1 $170,000) 2 (DESIGN AND CONTINGENCIES - $10,000) 3 (5) SR 0035, SR 0035 OVER TRIBUTARY OF 4 MAHANTANGO CREEK, PERRY TOWNSHIP, 5 BRIDGE REPLACEMENT 815,000 6 (BASE CONSTRUCTION ALLOCATION - 7 $652,000) 8 (LAND ALLOCATION - $41,000) 9 (DESIGN AND CONTINGENCIES - $122,000) 10 (6) SR 0104, SR 0104 OVER BRANCH OF 11 MAHANTANGO CREEK, PERRY TOWNSHIP, 12 BRIDGE REPLACEMENT 430,000 13 (BASE CONSTRUCTION ALLOCATION - 14 $345,000) 15 (LAND ALLOCATION - $20,000) 16 (DESIGN AND CONTINGENCIES - $65,000) 17 (7) SR 0104, SR 0104 OVER MIDDLE CREEK, 18 FRANKLIN TOWNSHIP, BRIDGE REPLACEMENT 440,000 19 (BASE CONSTRUCTION ALLOCATION - 20 $350,000) 21 (LAND ALLOCATION - $20,000) 22 (DESIGN AND CONTINGENCIES - $70,000) 23 (8) SR 0522, SR 0522 OVER TRIBUTARY OF 24 MIDDLE CREEK, SPRING TOWNSHIP, BRIDGE 25 REPLACEMENT 500,000 26 (BASE CONSTRUCTION ALLOCATION - 27 $400,000) 28 (LAND ALLOCATION - $25,000) 29 (DESIGN AND CONTINGENCIES - $75,000) 30 (9) SR 0522, SR 0522 OVER TRIBUTARY OF 19970H0030B0757 - 262 -
1 MIDDLE CREEK, SPRING TOWNSHIP, BRIDGE 2 REPLACEMENT 896,000 3 (BASE CONSTRUCTION ALLOCATION - 4 $717,000) 5 (LAND ALLOCATION - $45,000) 6 (DESIGN AND CONTINGENCIES - $134,000) 7 (10) SR 0522, SR 0522 OVER TRIBUTARY OF 8 MIDDLE CREEK, BEAVERTOWN BOROUGH, 9 BRIDGE REPLACEMENT 244,000 10 (BASE CONSTRUCTION ALLOCATION - 11 $195,000) 12 (LAND ALLOCATION - $12,000) 13 (DESIGN AND CONTINGENCIES - $37,000) 14 (11) SR 0522, SR 0522 OVER TRIBUTARY OF 15 MIDDLE CREEK, BEAVERTOWN BOROUGH, 16 BRIDGE REPLACEMENT 245,000 17 (BASE CONSTRUCTION ALLOCATION - 18 $196,000) 19 (LAND ALLOCATION - $12,000) 20 (DESIGN AND CONTINGENCIES - $37,000) 21 (12) SR 0522, SR 0522 OVER KERN RUN, 22 BEAVERTOWN BOROUGH, BRIDGE REPLACEMENT 570,000 23 (BASE CONSTRUCTION ALLOCATION - 24 $456,000) 25 (LAND ALLOCATION - $29,000) 26 (DESIGN AND CONTINGENCIES - $85,000) 27 (13) SR 0522, SR 0522 OVER PENNS CREEK, 28 SELINSGROVE BOROUGH, BRIDGE 29 REPLACEMENT 3,167,000 30 (BASE CONSTRUCTION ALLOCATION - 19970H0030B0757 - 263 -
1 $2,534,000) 2 (LAND ALLOCATION - $158,000) 3 (DESIGN AND CONTINGENCIES - $475,000) 4 (14) SR 1011, SR 1011 OVER TRIBUTARY OF 5 PENNS CREEK, JACKSON TOWNSHIP, BRIDGE 6 REPLACEMENT 241,000 7 (BASE CONSTRUCTION ALLOCATION - 8 $193,000) 9 (LAND ALLOCATION - $12,000) 10 (DESIGN AND CONTINGENCIES - $36,000) 11 (15) SR 2013, SR 2013 OVER TRIBUTARY OF 12 SUSQUEHANNA RIVER, CHAPMAN TOWNSHIP, 13 BRIDGE REPLACEMENT 202,000 14 (BASE CONSTRUCTION ALLOCATION - 15 $162,000) 16 (LAND ALLOCATION - $10,000) 17 (DESIGN AND CONTINGENCIES - $30,000) 18 (16) SR 3009, SR 3009 OVER PAXTONVILLE 19 CREEK, FRANKLIN TOWNSHIP, BRIDGE 20 REPLACEMENT 1,512,000 21 (BASE CONSTRUCTION ALLOCATION - 22 $1,209,000) 23 (LAND ALLOCATION - $76,000) 24 (DESIGN AND CONTINGENCIES - $227,000) 25 SECTION 60. SOMERSET COUNTY. 26 (A) LOCAL BRIDGES 27 (1) MIDDLECREEK TOWNSHIP, T-338, BLUE HOLE 28 CREEK BRIDGE OVER BLUE HOLE CREEK, 29 BRIDGE REPLACEMENT 505,000 30 (BASE CONSTRUCTION ALLOCATION - 19970H0030B0757 - 264 -
1 $400,000) 2 (LAND ALLOCATION - $10,000) 3 (DESIGN AND CONTINGENCIES - $95,000) 4 (2) PAINT BOROUGH, PENNSYLVANIA RAILROAD 5 BRIDGE OVER BEDFORD STREET, BRIDGE 6 REPLACEMENT 350,000 7 (BASE CONSTRUCTION ALLOCATION - 8 $250,000) 9 (LAND ALLOCATION - $25,000) 10 (DESIGN AND CONTINGENCIES - $75,000) 11 (3) SHADE TOWNSHIP, T-712, LIPINSKI ROAD 12 BRIDGE OVER DARK SHADE CREEK, BRIDGE 13 REPLACEMENT 560,000 14 (BASE CONSTRUCTION ALLOCATION - 15 $450,000) 16 (LAND ALLOCATION - $10,000) 17 (DESIGN AND CONTINGENCIES - $100,000) 18 (4) SOMERSET BOROUGH, CHURCH STREET BRIDGE 19 OVER PARSONS RUN, BRIDGE REPLACEMENT 350,000 20 (BASE CONSTRUCTION ALLOCATION - 21 $250,000) 22 (LAND ALLOCATION - $25,000) 23 (DESIGN AND CONTINGENCIES - $75,000) 24 (5) WINDBER BOROUGH, SOUTH 22ND STREET 25 BRIDGE OVER SEESE RUN, BRIDGE 26 REPLACEMENT 350,000 27 (BASE CONSTRUCTION ALLOCATION - 28 $250,000) 29 (LAND ALLOCATION - $25,000) 30 (DESIGN AND CONTINGENCIES - $75,000) 19970H0030B0757 - 265 -
1 (6) WINDBER BOROUGH, 24TH STREET BRIDGE 2 OVER SEESE RUN, BRIDGE REPLACEMENT 350,000 3 (BASE CONSTRUCTION ALLOCATION - 4 $250,000) 5 (LAND ALLOCATION - $25,000) 6 (DESIGN AND CONTINGENCIES - $75,000) 7 (7) WINDBER BOROUGH, VILLAGE STREET BRIDGE 8 OVER SEESE RUN, BRIDGE REPLACEMENT 350,000 9 (BASE CONSTRUCTION ALLOCATION - 10 $250,000) 11 (LAND ALLOCATION - $25,000) 12 (DESIGN AND CONTINGENCIES - $75,000) 13 (8) SUMMIT TOWNSHIP, KEYSTONE VIADUCT OVER 14 SR 2006, CSX MAINLINE AND FLAUGHERTY 15 CREEK, BRIDGE REHABILITATION 715,000 16 (BASE CONSTRUCTION ALLOCATION - 17 $663,000) 18 (DESIGN AND CONTINGENCIES - $52,000) 19 (B) STATE BRIDGES 20 (1) SR 0160, SR 0160 OVER TRIBUTARY OF 21 BOONES RUN, STONEY CREEK TOWNSHIP, 22 BRIDGE REPLACEMENT 580,000 23 (BASE CONSTRUCTION ALLOCATION - 24 $430,000) 25 (LAND ALLOCATION - $25,000) 26 (DESIGN AND CONTINGENCIES - $125,000) 27 (2) SR 0523, SR 0523 OVER WHITES CREEK, 28 ADDISON TOWNSHIP, BRIDGE REPLACEMENT 690,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $510,000) 19970H0030B0757 - 266 -
1 (LAND ALLOCATION - $50,000) 2 (DESIGN AND CONTINGENCIES - $130,000) 3 (3) SR 1007, SR 1007 OVER LAMBERT RUN, 4 STONEY CREEK TOWNSHIP, BRIDGE 5 REPLACEMENT 490,000 6 (BASE CONSTRUCTION ALLOCATION - 7 $355,000) 8 (LAND ALLOCATION - $25,000) 9 (DESIGN AND CONTINGENCIES - $110,000) 10 (4) SR 1017, SR 1017 OVER BREASTWORK RUN, 11 ALLEGHENY TOWNSHIP, BRIDGE REPLACEMENT 650,000 12 (BASE CONSTRUCTION ALLOCATION - 13 $490,000) 14 (LAND ALLOCATION - $25,000) 15 (DESIGN AND CONTINGENCIES - $135,000) 16 (5) SR 1017, SR 1017 OVER BREASTWORK RUN, 17 ALLEGHENY TOWNSHIP, BRIDGE REPLACEMENT 580,000 18 (BASE CONSTRUCTION ALLOCATION - 19 $440,000) 20 (LAND ALLOCATION - $25,000) 21 (DESIGN AND CONTINGENCIES - $135,000) 22 (6) SR 1018, SR 1018 OVER BEAVERDAM RUN, 23 SHADE TOWNSHIP, BRIDGE REPLACEMENT 545,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $400,000) 26 (LAND ALLOCATION - $25,000) 27 (DESIGN AND CONTINGENCIES - $120,000) 28 (7) SR 1018, SR 1018 OVER BEAVERDAM RUN, 29 SHADE TOWNSHIP, BRIDGE REPLACEMENT 515,000 30 (BASE CONSTRUCTION ALLOCATION - 19970H0030B0757 - 267 -
1 $375,000) 2 (LAND ALLOCATION - $25,000) 3 (DESIGN AND CONTINGENCIES - $115,000) 4 (8) SR 2005, SR 2005 OVER ELK LICK CREEK, 5 ELK LICK TOWNSHIP, BRIDGE REPLACEMENT 520,000 6 (BASE CONSTRUCTION ALLOCATION - 7 $380,000) 8 (LAND ALLOCATION - $25,000) 9 (DESIGN AND CONTINGENCIES - $115,000) 10 (9) SR 4013, SR 4013 OVER NORTH BRANCH OF 11 QUEMAHONING CREEK, LINCOLN TOWNSHIP, 12 BRIDGE REPLACEMENT 585,000 13 (BASE CONSTRUCTION ALLOCATION - 14 $435,000) 15 (LAND ALLOCATION - $25,000) 16 (DESIGN AND CONTINGENCIES - $125,000) 17 (10) SR 4019, SR 4019 OVER QUEMAHONING 18 CREEK, QUEMAHONING TOWNSHIP, BRIDGE 19 REPLACEMENT 800,000 20 (BASE CONSTRUCTION ALLOCATION - 21 $625,000) 22 (LAND ALLOCATION - $25,000) 23 (DESIGN AND CONTINGENCIES - $150,000) 24 (11) SR 3039, SR 3039 OVER ALLEN CREEK, 25 MIDDLECREEK TOWNSHIP, BRIDGE 26 REPLACEMENT 200,000 27 (BASE CONSTRUCTION ALLOCATION - 28 $150,000) 29 (LAND ALLOCATION - $5,000) 30 (DESIGN AND CONTINGENCIES - $45,000) 19970H0030B0757 - 268 -
1 (12) SR 3039, SR 3039 OVER ALLEN CREEK, 2 MIDDLECREEK TOWNSHIP, BRIDGE 3 REPLACEMENT 220,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $150,000) 6 (LAND ALLOCATION - $10,000) 7 (DESIGN AND CONTINGENCIES - $60,000) 8 (13) SR 4001, SR 4001 OVER CLEAR RUN, 9 JEFFERSON TOWNSHIP, BRIDGE REPLACEMENT 295,000 10 (BASE CONSTRUCTION ALLOCATION - 11 $200,000) 12 (LAND ALLOCATION - $10,000) 13 (DESIGN AND CONTINGENCIES - $85,000) 14 SECTION 61. SULLIVAN COUNTY. 15 (A) LOCAL BRIDGES 16 (1) FORKS TOWNSHIP, T-448, OLD TR 87 17 BRIDGE, COUNTY BRIDGE NO.55 OVER LITTLE 18 LOYALSOCK CREEK, BRIDGE REPLACEMENT 860,000 19 (BASE CONSTRUCTION ALLOCATION - 20 $700,000) 21 (LAND ALLOCATION - $10,000) 22 (DESIGN AND CONTINGENCIES - $150,000) 23 (2) FORKS AND LAPORTE TOWNSHIPS, T-346 24 OVER LOYALSOCK CREEK, BRIDGE 25 REPLACEMENT 840,000 26 (BASE CONSTRUCTION ALLOCATION - 27 $730,000) 28 (LAND ALLOCATION - $10,000) 29 (DESIGN AND CONTINGENCIES - $100,000) 30 (B) STATE BRIDGES 19970H0030B0757 - 269 -
1 (1) SR 0087, SR 0087 OVER LICK RUN, FORKS 2 TOWNSHIP, BRIDGE REPLACEMENT 635,000 3 (BASE CONSTRUCTION ALLOCATION - 4 $508,000) 5 (LAND ALLOCATION - $32,000) 6 (DESIGN AND CONTINGENCIES - $95,000) 7 (2) SR 0087, SR 0087 OVER LITTLE LOYALSOCK 8 CREEK, CHERRY TOWNSHIP, BRIDGE 9 REPLACEMENT 655,000 10 (BASE CONSTRUCTION ALLOCATION - 11 $524,000) 12 (LAND ALLOCATION - $33,000) 13 (DESIGN AND CONTINGENCIES - $98,000) 14 (3) SR 0154, SR 0154 OVER BLACK WATER RUN, 15 ELKLAND TOWNSHIP, BRIDGE REPLACEMENT 194,000 16 (BASE CONSTRUCTION ALLOCATION - 17 $166,000) 18 (DESIGN AND CONTINGENCIES - $28,000) 19 (4) SR 0154, SR 0154 OVER KINGS CREEK, 20 ELKLAND TOWNSHIP, BRIDGE REPLACEMENT 404,000 21 (BASE CONSTRUCTION ALLOCATION - 22 $323,000) 23 (LAND ALLOCATION - $20,000) 24 (DESIGN AND CONTINGENCIES - $61,000) 25 (5) SR 1012, SR 1012 OVER LITTLE LOYALSOCK 26 CREEK, CHERRY TOWNSHIP, BRIDGE 27 REPLACEMENT 260,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $208,000) 30 (LAND ALLOCATION - $13,000) 19970H0030B0757 - 270 -
1 (DESIGN AND CONTINGENCIES - $39,000) 2 SECTION 62. SUSQUEHANNA COUNTY. 3 (A) LOCAL BRIDGES (RESERVED) 4 (B) STATE BRIDGES 5 (1) SR 0167, OWEGO STREET BRIDGE OVER 6 BRANCH OF FALL BROOK, BRIDGEWATER 7 TOWNSHIP, BRIDGE REPLACEMENT 413,000 8 (BASE CONSTRUCTION ALLOCATION - 9 $342,000) 10 (LAND ALLOCATION - $10,000) 11 (DESIGN AND CONTINGENCIES - $61,000) 12 (2) SR 1016, SALT LICK CREEK BRIDGE OVER 13 BRANCH OF SALT LICK CREEK, NEW MILFORD 14 TOWNSHIP, BRIDGE REPLACEMENT 100,000 15 (BASE CONSTRUCTION ALLOCATION - 16 $86,000) 17 (LAND ALLOCATION - $3,000) 18 (DESIGN AND CONTINGENCIES - $11,000) 19 (3) SR 0081, BRIDGE OVER TROWBRIDGE CREEK, 20 1 MILE SOUTH OF THE PENNSYLVANIA AND 21 NEW YORK STATE LINE, GREAT BEND 22 TOWNSHIP, BRIDGE REPLACEMENT 890,000 23 (BASE CONSTRUCTION ALLOCATION - 24 $700,000) 25 (LAND ALLOCATION - $10,000) 26 (DESIGN AND CONTINGENCIES - $180,000) 27 (4) SR 1017, GULF STREET BRIDGE, 0.5 MILE 28 NORTH OF SR 1015, LANESBORO BOROUGH, 29 BRIDGE REPLACEMENT 305,000 30 (BASE CONSTRUCTION ALLOCATION - 19970H0030B0757 - 271 -
1 $220,000) 2 (LAND ALLOCATION - $10,000) 3 (DESIGN AND CONTINGENCIES - $75,000) 4 (5) SR 3003, BRIDGE OVER TRANSUE CREEK, 5 1.5 MILES SOUTH OF SR 3005, AUBURN 6 TOWNSHIP, BRIDGE PAINTING 60,000 7 (BASE CONSTRUCTION ALLOCATION - 8 $50,000) 9 (DESIGN AND CONTINGENCIES - $10,000) 10 (6) SR 3006, BRIDGE OVER WHITE CREEK, 1.5 11 MILES WEST OF SR 3004, SPRINGVILLE 12 TOWNSHIP, BRIDGE PAINTING 70,000 13 (BASE CONSTRUCTION ALLOCATION - 14 $60,000) 15 (DESIGN AND CONTINGENCIES - $10,000) 16 (7) SR 0011, BRIDGE OVER SALT LICK CREEK, 17 0.6 MILE NORTH OF TR 492, NEW MILFORD 18 BOROUGH, BRIDGE REPLACEMENT 660,000 19 (BASE CONSTRUCTION ALLOCATION - 20 $510,000) 21 (LAND ALLOCATION - $20,000) 22 (DESIGN AND CONTINGENCIES - $130,000) 23 (8) SR 0367, BRIDGE OVER TUSCARORA CREEK, 24 NORTH OF SR 3005, AUBURN TOWNSHIP, 25 BRIDGE REPLACEMENT 330,000 26 (BASE CONSTRUCTION ALLOCATION - 27 $265,000) 28 (LAND ALLOCATION - $10,000) 29 (DESIGN AND CONTINGENCIES - $65,000) 30 (9) SR 1010, BRIDGE OVER BEDBUG CREEK, 19970H0030B0757 - 272 -
1 WEST OF SR 1021, OAKLAND TOWNSHIP, 2 BRIDGE REPLACEMENT 325,000 3 (BASE CONSTRUCTION ALLOCATION - 4 $250,000) 5 (LAND ALLOCATION - $10,000) 6 (DESIGN AND CONTINGENCIES - $65,000) 7 (10) SR 1010, BRIDGE OVER TRIBUTARY OF 8 SUSQUEHANNA RIVER, 2 MILES WEST OF SR 9 1021, GREAT BEND TOWNSHIP, BRIDGE 10 REPLACEMENT 288,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $220,000) 13 (LAND ALLOCATION - $10,000) 14 (DESIGN AND CONTINGENCIES - $58,000) 15 (11) SR 2046, BRIDGE OVER BRANCH OF 16 TUNKHANNOCK CREEK, EAST OF TR 92, 17 GIBSON TOWNSHIP, BRIDGE REPLACEMENT 513,000 18 (BASE CONSTRUCTION ALLOCATION - 19 $400,000) 20 (LAND ALLOCATION - $10,000) 21 (DESIGN AND CONTINGENCIES - $103,000) 22 (12) SR 3017, BRIDGE OVER THOMAS CREEK, 23 SOUTHEAST OF TR 29, SPRINGVILLE 24 TOWNSHIP, BRIDGE REPLACEMENT 285,000 25 (BASE CONSTRUCTION ALLOCATION - 26 $220,000) 27 (LAND ALLOCATION - $10,000) 28 (DESIGN AND CONTINGENCIES - $50,000) 29 (13) STATE BRIDGES, COUNTYWIDE BRIDGE ZONE 30 PAINTING, BRIDGE PAINTING 370,000 19970H0030B0757 - 273 -
1 (BASE CONSTRUCTION ALLOCATION - 2 $350,000) 3 (LAND ALLOCATION - $10,000) 4 (DESIGN AND CONTINGENCIES - $10,000) 5 (14) SR 0858, BRANCH OF APOLACON CREEK, 6 0.3 MILE NORTH OF SR 4013, APOLACON 7 TOWNSHIP, BRIDGE REPLACEMENT 220,000 8 (BASE CONSTRUCTION ALLOCATION - 9 $180,000) 10 (LAND ALLOCATION - $10,000) 11 (DESIGN AND CONTINGENCIES - $30,000) 12 (15) SR 1010, SR 1010 OVER TRIBUTARY OF 13 SUSQUEHANNA RIVER, GREAT BEND TOWNSHIP, 14 BRIDGE REPLACEMENT 230,000 15 (BASE CONSTRUCTION ALLOCATION - 16 $190,000) 17 (LAND ALLOCATION - $10,000) 18 (DESIGN AND CONTINGENCIES - $30,000) 19 (16) SR 1010, SR 1010 OVER BEDBUG CREEK, 20 OAKLAND TOWNSHIP, BRIDGE REPLACEMENT 270,000 21 (BASE CONSTRUCTION ALLOCATION - 22 $220,000) 23 (LAND ALLOCATION - $10,000) 24 (DESIGN AND CONTINGENCIES - $40,000) 25 (17) SR 2046, SR 2046 OVER TUNKHANNOCK 26 CREEK, GIBSON TOWNSHIP, BRIDGE 27 REPLACEMENT 440,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $370,000) 30 (LAND ALLOCATION - $10,000) 19970H0030B0757 - 274 -
1 (DESIGN AND CONTINGENCIES - $60,000) 2 SECTION 63. TIOGA COUNTY. 3 (A) LOCAL BRIDGES 4 (1) ELKLAND BOROUGH, NORTH BUFFALO STREET 5 OVER CAMP BROOK CREEK, BRIDGE 6 REPLACEMENT 510,000 7 (BASE CONSTRUCTION ALLOCATION) - 8 $360,000) 9 (LAND ALLOCATION - $20,000) 10 (DESIGN AND CONTINGENCIES - $130,000) 11 (B) STATE BRIDGES 12 (1) SR 0249, LOSEY CREEK BRIDGE, SOUTH OF 13 SR 4017 IN VILLAGE OF KEENEYVILLE, 14 MIDDLEBURY TOWNSHIP, BRIDGE 15 REHABILITATION 250,000 16 (BASE CONSTRUCTION ALLOCATION - 17 $210,000) 18 (LAND ALLOCATION - $5,000) 19 (DESIGN AND CONTINGENCIES - $35,000) 20 (2) SR 1002, COREY CREEK BRIDGE OVER COREY 21 CREEK, NORTHEAST OF MANSFIELD, BRIDGE 22 REPLACEMENT 346,000 23 (BASE CONSTRUCTION ALLOCATION - 24 $277,000) 25 (LAND ALLOCATION - $17,000) 26 (DESIGN AND CONTINGENCIES - $52,000) 27 (3) SR 3001, KETTLE CREEK BRIDGE, 11 MILES 28 SOUTH OF WATROUS, BRIDGE REPLACEMENT 366,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $293,000) 19970H0030B0757 - 275 -
1 (LAND ALLOCATION - $18,000) 2 (DESIGN AND CONTINGENCIES - $55,000) 3 (4) SR 3023, HEISE RUN NORTH BRIDGE, WEST 4 OF WELLSBORO, BRIDGE REPLACEMENT 240,000 5 (BASE CONSTRUCTION ALLOCATION - 6 $192,000) 7 (LAND ALLOCATION - $12,000) 8 (DESIGN AND CONTINGENCIES - $36,000) 9 (5) SR 4017, HOLDEN CREEK BRIDGE NO.1, 10 BRIDGE REPLACEMENT 584,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $467,000) 13 (LAND ALLOCATION - $29,000) 14 (DESIGN AND CONTINGENCIES - $88,000) 15 (6) SR 4024, ELKHORN CREEK BRIDGE, WEST OF 16 TIOGA BOROUGH, BRIDGE REPLACEMENT 451,000 17 (BASE CONSTRUCTION ALLOCATION - 18 $401,000) 19 (LAND ALLOCATION - $15,000) 20 (DESIGN AND CONTINGENCIES - $35,000) 21 (7) SR 3007, BRIDGE OVER STONEY FORK 22 CREEK, BRIDGE PAINTING 160,000 23 (BASE CONSTRUCTION ALLOCATION - 24 $150,000) 25 (DESIGN AND CONTINGENCIES - $10,000) 26 (8) SR 4017, BRIDGE OVER COWANESQUE RIVER, 27 BRIDGE PAINTING 475,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $465,000) 30 (DESIGN AND CONTINGENCIES - $10,000) 19970H0030B0757 - 276 -
1 (9) SR 0049, SR 0049 OVER COWANESQUE 2 RIVER, WESTFIELD TOWNSHIP, BRIDGE 3 REPLACEMENT 1,802,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $1,442,000) 6 (LAND ALLOCATION - $90,000) 7 (DESIGN AND CONTINGENCIES - $270,000) 8 (10) SR 0287, SR 0287 OVER WELLSBORO 9 STREET - CONRAIL, TIOGA TOWNSHIP, 10 BRIDGE REPLACEMENT 1,709,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $1,367,000) 13 (LAND ALLOCATION - $86,000) 14 (DESIGN AND CONTINGENCIES - $256,000) 15 (11) SR 0328, SR 0328 OVER HAMMOND CREEK, 16 JACKSON TOWNSHIP, BRIDGE REPLACEMENT 256,000 17 (BASE CONSTRUCTION ALLOCATION - 18 $205,000) 19 (LAND ALLOCATION - $13,000) 20 (DESIGN AND CONTINGENCIES - $38,000) 21 (12) SR 0349, SR 0349 OVER MILL CREEK, 22 CLYMER TOWNSHIP, BRIDGE REPLACEMENT 1,000,000 23 (BASE CONSTRUCTION ALLOCATION - 24 $800,000) 25 (LAND ALLOCATION - $50,000) 26 (DESIGN AND CONTINGENCIES - $150,000) 27 (13) SR 1030, SR 1030 OVER CONRAIL, TIOGA 28 TOWNSHIP, BRIDGE REPLACEMENT 561,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $449,000) 19970H0030B0757 - 277 -
1 (LAND ALLOCATION - $28,000) 2 (DESIGN AND CONTINGENCIES - $84,000) 3 (14) SR 2017, SR 2017 OVER MILL CREEK, 4 UNION TOWNSHIP, BRIDGE REPLACEMENT 584,000 5 (BASE CONSTRUCTION ALLOCATION - 6 $467,000) 7 (LAND ALLOCATION - $27,000) 8 (DESIGN AND CONTINGENCIES - $88,000) 9 (15) SR 4017, SR 4017 BRIDGE NO.2 OVER 10 HOLDEN CREEK, OSCEOLA TOWNSHIP, BRIDGE 11 REPLACEMENT 542,000 12 (BASE CONSTRUCTION ALLOCATION - 13 $434,000) 14 (LAND ALLOCATION - $27,000) 15 (DESIGN AND CONTINGENCIES - $81,000) 16 (16) SR 0015, MILL CREEK BRIDGE SPANNING 17 TIOGA DAM IMPOUNDMENT AT CONFLUENCE, 18 TWO-LANE BRIDGE CONSTRUCTION 6,875,000 19 (BASE CONSTRUCTION ALLOCATION - 20 $6,250,000) 21 (DESIGN AND CONTINGENCIES - $625,000) 22 SECTION 64. UNION COUNTY. 23 (A) LOCAL BRIDGES (RESERVED) 24 (B) STATE BRIDGES 25 (1) SR 0192, RAPID RUN BRIDGE II OVER 26 RAPID RUN, LEWIS TOWNSHIP, BRIDGE 27 REHABILITATION 250,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $200,000) 30 (LAND ALLOCATION - $13,000) 19970H0030B0757 - 278 -
1 (DESIGN AND CONTINGENCIES - $37,000) 2 (2) SR 0192, RAPID RUN BRIDGE I OVER RAPID 3 RUN, LEWIS TOWNSHIP, BRIDGE 4 REHABILITATION 205,000 5 (BASE CONSTRUCTION ALLOCATION - 6 $164,000) 7 (LAND ALLOCATION - $10,000) 8 (DESIGN AND CONTINGENCIES - $31,000) 9 (3) SR 0044, BRIDGE OVER SPRING CREEK, 10 BRIDGE PAINTING 110,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $100,000) 13 (DESIGN AND CONTINGENCIES - $10,000) 14 (4) SR 1004, BRIDGE OVER LITTLE BUFFALO 15 CREEK, BRIDGE PAINTING 75,000 16 (BASE CONSTRUCTION ALLOCATION - 17 $65,000) 18 (DESIGN AND CONTINGENCIES - $10,000) 19 (5) SR 1012, BRIDGE OVER WHITE DEER HOLE 20 CREEK, BRIDGE PAINTING 160,000 21 (BASE CONSTRUCTION ALLOCATION - 22 $150,000) 23 (DESIGN AND CONTINGENCIES - $10,000) 24 (6) SR 0235, SR 0235 OVER LAUREL RUN, 25 HARTLEY TOWNSHIP, BRIDGE REPLACEMENT 1,118,000 26 (BASE CONSTRUCTION ALLOCATION - 27 $894,000) 28 (LAND ALLOCATION - $56,000) 29 (DESIGN AND CONTINGENCIES - $168,000) 30 (7) SR 0235, SR 0235 OVER BUFFALO CREEK, 19970H0030B0757 - 279 -
1 LEWIS TOWNSHIP, BRIDGE REPLACEMENT 395,000 2 (BASE CONSTRUCTION ALLOCATION - 3 $316,000) 4 (LAND ALLOCATION - $20,000) 5 (DESIGN AND CONTINGENCIES - $59,000) 6 SECTION 65. VENANGO COUNTY. 7 (A) LOCAL BRIDGES 8 (1) RICHLAND TOWNSHIP, T-552 OVER MILL 9 CREEK, BRIDGE REPLACEMENT 475,000 10 (BASE CONSTRUCTION ALLOCATION - 11 $355,000) 12 (LAND ALLOCATION - $10,000) 13 (DESIGN AND CONTINGENCIES - $110,000) 14 (2) RICHLAND TOWNSHIP, T-361 OVER UNNAMED 15 TRIBUTARY OF MILL CREEK, BRIDGE 16 REPLACEMENT 337,000 17 (BASE CONSTRUCTION ALLOCATION - 18 $242,000) 19 (LAND ALLOCATION - $10,000) 20 (DESIGN AND CONTINGENCIES - $85,000) 21 (3) RICHLAND TOWNSHIP, T-377 OVER SAGE 22 RUN, BRIDGE REPLACEMENT 385,000 23 (BASE CONSTRUCTION ALLOCATION - 24 $290,000) 25 (LAND ALLOCATION - $10,000) 26 (DESIGN AND CONTINGENCIES - $85,000) 27 (4) PINEGROVE TOWNSHIP, T-628 OVER EAST 28 SANDY CREEK, BRIDGE REPLACEMENT 363,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $307,000) 19970H0030B0757 - 280 -
1 (LAND ALLOCATION - $6,000) 2 (DESIGN AND CONTINGENCIES - $50,000) 3 (5) CRANBERRY TOWNSHIP, T-679 OVER BRANCH 4 OF SAGE RUN, BRIDGE REPLACEMENT 106,000 5 (BASE CONSTRUCTION ALLOCATION - 6 $100,000) 7 (LAND ALLOCATION - $1,000) 8 (DESIGN AND CONTINGENCIES - $5,000) 9 (6) OAKLAND TOWNSHIP, T-567 OVER BRANCH OF 10 TWO MILE RUN, BRIDGE REPLACEMENT 106,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $100,000) 13 (LAND ALLOCATION - $1,000) 14 (DESIGN AND CONTINGENCIES - $5,000) 15 (7) ROCKLAND TOWNSHIP, T-512 OVER EAST 16 SANDY CREEK, BRIDGE REPLACEMENT 360,000 17 (BASE CONSTRUCTION ALLOCATION - 18 $300,000) 19 (LAND ALLOCATION - $10,000) 20 (DESIGN AND CONTINGENCIES - $50,000) 21 (8) PINEGROVE TOWNSHIP, T-628 OVER EAST 22 SANDY CREEK, BRIDGE REPLACEMENT 510,000 23 (BASE CONSTRUCTION ALLOCATION - 24 $400,000) 25 (LAND ALLOCATION - $10,000) 26 (DESIGN AND CONTINGENCIES - $100,000) 27 (B) STATE BRIDGES 28 (1) SR 4001, SR 4001 OVER TWO MILE RUN 29 WEST BRANCH, SUGARCREEK BOROUGH, BRIDGE 30 REPLACEMENT 205,000 19970H0030B0757 - 281 -
1 (BASE CONSTRUCTION ALLOCATION - 2 $150,000) 3 (LAND ALLOCATION - $5,000) 4 (DESIGN AND CONTINGENCIES - $50,000) 5 (2) SR 0227, SR 0227 OVER CHERRY RUN, 6 CORNPLANTER TOWNSHIP, BRIDGE 7 REPLACEMENT 280,000 8 (BASE CONSTRUCTION ALLOCATION - 9 $200,000) 10 (LAND ALLOCATION - $20,000) 11 (DESIGN AND CONTINGENCIES - $60,000) 12 (3) SR 0322, SR 0322 OVER HALLS RUN, 13 CRANBERRY TOWNSHIP, BRIDGE REPLACEMENT 2,600,000 14 (BASE CONSTRUCTION ALLOCATION - 15 $2,000,000) 16 (LAND ALLOCATION - $100,000) 17 (DESIGN AND CONTINGENCIES - $500,000) 18 (4) SR 3009, SR 3009 OVER I-80, SCRUBGRASS 19 TOWNSHIP, BRIDGE REPLACEMENT 810,000 20 (BASE CONSTRUCTION ALLOCATION - 21 $700,000) 22 (LAND ALLOCATION - $10,000) 23 (DESIGN AND CONTINGENCIES - $100,000) 24 (5) SR 3017, SR 3017 OVER WARDEN RUN, 25 CANAL TOWNSHIP, BRIDGE REPLACEMENT 920,000 26 (BASE CONSTRUCTION ALLOCATION - 27 $800,000) 28 (LAND ALLOCATION - $20,000) 29 (DESIGN AND CONTINGENCIES - $100,000) 30 (6) SR 0038, SR 0038 OVER PINE RUN, 19970H0030B0757 - 282 -
1 RICHLAND TOWNSHIP, BRIDGE 2 REHABILITATION 110,000 3 (BASE CONSTRUCTION ALLOCATION - 4 $100,000) 5 (DESIGN AND CONTINGENCIES - $10,000) 6 (7) SR 3025, SR 3025 OVER HAYS RUN, CITY 7 OF OIL CITY, BRIDGE REPLACEMENT 340,000 8 (BASE CONSTRUCTION ALLOCATION - 9 $300,000) 10 (LAND ALLOCATION - $5,000) 11 (DESIGN AND CONTINGENCIES - $35,000) 12 SECTION 66. WARREN COUNTY. 13 (A) LOCAL BRIDGES (RESERVED) 14 (B) STATE BRIDGES 15 (1) SR 0006, SR 0006 OVER WINTROTH RUN, 16 BROKENSTRAW TOWNSHIP, BRIDGE 17 REPLACEMENT 260,000 18 (BASE CONSTRUCTION ALLOCATION - 19 $180,000) 20 (LAND ALLOCATION - $20,000) 21 (DESIGN AND CONTINGENCIES - $60,000) 22 (2) SR 0006, SR 0006 OVER SIX MILE RUN, 23 MEAD TOWNSHIP, BRIDGE REPLACEMENT 320,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $250,000) 26 (LAND ALLOCATION - $10,000) 27 (DESIGN AND CONTINGENCIES - $60,000) 28 (3) SR 0027, SR 0027 OVER PINE CREEK, 29 SOUTHWEST TOWNSHIP, BRIDGE REPLACEMENT 800,000 30 (BASE CONSTRUCTION ALLOCATION - 19970H0030B0757 - 283 -
1 $580,000) 2 (LAND ALLOCATION - $20,000) 3 (DESIGN AND CONTINGENCIES - $200,000) 4 (4) SR 0027, SR 0027 OVER HAZELTINE HOLLOW 5 RUN, BROKENSTRAW TOWNSHIP, BRIDGE 6 REPLACEMENT 310,000 7 (BASE CONSTRUCTION ALLOCATION - 8 $210,000) 9 (LAND ALLOCATION - $20,000) 10 (DESIGN AND CONTINGENCIES - $80,000) 11 (5) SR 0062, SR 0062 OVER BULLY RUN, 12 WATSON TOWNSHIP, BRIDGE REPLACEMENT 300,000 13 (BASE CONSTRUCTION ALLOCATION - 14 $230,000) 15 (LAND ALLOCATION - $20,000) 16 (DESIGN AND CONTINGENCIES - $50,000) 17 (6) SR 0957, SR 0957 OVER LITTLE 18 BROKENSTRAW CREEK, FREEHOLD TOWNSHIP, 19 BRIDGE REPLACEMENT 800,000 20 (BASE CONSTRUCTION ALLOCATION - 21 $620,000) 22 (LAND ALLOCATION - $20,000) 23 (DESIGN AND CONTINGENCIES - $160,000) 24 (7) SR 3009, SR 3009 OVER TIDIOUTE CREEK, 25 DEERFIELD TOWNSHIP, BRIDGE REPLACEMENT 470,000 26 (BASE CONSTRUCTION ALLOCATION - 27 $400,000) 28 (LAND ALLOCATION - $10,000) 29 (DESIGN AND CONTINGENCIES - $60,000) 30 (8) SR 4013, SR 4013 OVER MATHEWS RUN, 19970H0030B0757 - 284 -
1 YOUNGSVILLE BOROUGH, BRIDGE 2 REPLACEMENT 430,000 3 (BASE CONSTRUCTION ALLOCATION - 4 $360,000) 5 (LAND ALLOCATION - $10,000) 6 (DESIGN AND CONTINGENCIES - $60,000) 7 (9) SR 4021, SR 4021 OVER BRANDS RUN, 8 SUGAR GROVE BOROUGH, BRIDGE 9 REPLACEMENT 240,000 10 (BASE CONSTRUCTION ALLOCATION - 11 $180,000) 12 (LAND ALLOCATION - $20,000) 13 (DESIGN AND CONTINGENCIES - $40,000) 14 (10) SR 0027, BRIDGE OVER HAZELTINE HOLLOW 15 RUN, BROKENSTRAW TOWNSHIP, BRIDGE 16 REPLACEMENT 500,000 17 (BASE CONSTRUCTION ALLOCATION - 18 $450,000) 19 (DESIGN AND CONTINGENCIES - $50,000) 20 (11) SR 0062, US 62, BRIDGE OVER BULLY 21 RUN, WATSON TOWNSHIP, BRIDGE 22 REPLACEMENT 410,000 23 (BASE CONSTRUCTION ALLOCATION - 24 $370,000) 25 (DESIGN AND CONTINGENCIES - $40,000) 26 (12) SR 3009, TIDIOUTE CREEK ROAD BRIDGE 27 NO.5 OVER TIDIOUTE CREEK, TRIUMPH 28 TOWNSHIP, BRIDGE REPLACEMENT 290,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $270,000) 19970H0030B0757 - 285 -
1 (DESIGN AND CONTINGENCIES - $20,000) 2 SECTION 67. WASHINGTON COUNTY. 3 (A) LOCAL BRIDGES 4 (1) BURGETTSTOWN BOROUGH, RACCOON BRIDGE 5 NO.23 OVER RACCOON CREEK, BRIDGE 6 REHABILITATION 433,000 7 (BASE CONSTRUCTION ALLOCATION - 8 $313,000) 9 (LAND ALLOCATION - $20,000) 10 (DESIGN AND CONTINGENCIES - $100,000) 11 (2) CHARTIERS TOWNSHIP, ALLISON HOLLOW 12 ROAD, ONE-LANE BRIDGE, BRIDGE 13 REPLACEMENT 195,000 14 (BASE CONSTRUCTION ALLOCATION - 15 $150,000) 16 (LAND ALLOCATION - $5,000) 17 (DESIGN AND CONTINGENCIES - $40,000) 18 (3) CHARTIERS TOWNSHIP, ALLISON HOLLOW 19 ROAD, ONE-LANE BRIDGE, BRIDGE 20 REPLACEMENT 195,000 21 (BASE CONSTRUCTION ALLOCATION - 22 $150,000) 23 (LAND ALLOCATION - $5,000) 24 (DESIGN AND CONTINGENCIES - $40,000) 25 (4) CHARTIERS TOWNSHIP, MCGOVERN ROAD 26 BRIDGE, BRIDGE REPLACEMENT 145,000 27 (BASE CONSTRUCTION ALLOCATION - 28 $100,000) 29 (LAND ALLOCATION - $5,000) 30 (DESIGN AND CONTINGENCIES - $40,000) 19970H0030B0757 - 286 -
1 (5) NORTH STRABANE TOWNSHIP, T-643, GALLEY 2 ROAD BRIDGE OVER LITTLE CHARTIERS 3 CREEK, BRIDGE REPLACEMENT 570,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $450,000) 6 (LAND ALLOCATION - $20,000) 7 (DESIGN AND CONTINGENCIES - $100,000) 8 (6) DONEGAL TOWNSHIP, T-541, LINDSAY 9 BRIDGE OVER BUCK RUN, BRIDGE 10 REPLACEMENT 285,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $255,000) 13 (DESIGN AND CONTINGENCIES - $30,000) 14 (7) DONEGAL TOWNSHIP, T-423, MAYS BRIDGE 15 OVER MIDDLE WHEELING CREEK, BRIDGE 16 REPLACEMENT 245,000 17 (BASE CONSTRUCTION ALLOCATION - 18 $215,000) 19 (DESIGN AND CONTINGENCIES - $30,000) 20 (8) INDEPENDENCE TOWNSHIP, T-649, CUMMINS 21 BRIDGE OVER SUGAR CAMP RUN, BRIDGE 22 REPLACEMENT 330,000 23 (BASE CONSTRUCTION ALLOCATION - 24 $300,000) 25 (DESIGN AND CONTINGENCIES - $30,000) 26 (9) MOUNT PLEASANT TOWNSHIP, T-749, SABO 27 ROAD OVER WESTLAND RUN, BRIDGE 28 REPLACEMENT 25,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $20,000) 19970H0030B0757 - 287 -
1 (DESIGN AND CONTINGENCIES - $5,000) 2 (10) MOUNT PLEASANT TOWNSHIP, T-606, 3 PRIMROSE ROAD OVER MILLERS RUN, BRIDGE 4 REPLACEMENT 25,000 5 (BASE CONSTRUCTION ALLOCATION - 6 $20,000) 7 (DESIGN AND CONTINGENCIES - $5,000) 8 (11) MOUNT PLEASANT TOWNSHIP, T-493, 9 MERIAGE STREET OVER ROBINSON RUN 10 TRIBUTARY, BRIDGE REPLACEMENT 25,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $20,000) 13 (DESIGN AND CONTINGENCIES - $5,000) 14 (12) NORTH BETHLEHEM TOWNSHIP, T-445, 15 DAGUE BRIDGE OVER PIGEON CREEK, BRIDGE 16 REPLACEMENT 250,000 17 (BASE CONSTRUCTION ALLOCATION - 18 $220,000) 19 (DESIGN AND CONTINGENCIES - $30,000) 20 (13) NORTH FRANKLIN TOWNSHIP, T-526, CARIO 21 DRIVE OVER UNNAMED TRIBUTARY OF CATFISH 22 CREEK, BRIDGE REPLACEMENT 46,000 23 (BASE CONSTRUCTION ALLOCATION - 24 $42,000) 25 (DESIGN AND CONTINGENCIES - $4,000) 26 (14) NOTTINGHAM TOWNSHIP, T-782, SUNDUST 27 ROAD CULVERT, 35 FEET NORTH OF 28 INTERSECTION WITH SR 1059, BRIDGE 29 REPLACEMENT 101,000 30 (BASE CONSTRUCTION ALLOCATION - 19970H0030B0757 - 288 -
1 $91,000) 2 (DESIGN AND CONTINGENCIES - $10,000) 3 (15) NOTTINGHAM TOWNSHIP, T-828, BARR 4 BRIDGE OVER MINGO CREEK, BRIDGE 5 REPLACEMENT 350,000 6 (BASE CONSTRUCTION ALLOCATION - 7 $310,000) 8 (DESIGN AND CONTINGENCIES - $40,000) 9 (16) ROBINSON TOWNSHIP, T-500, CHAMBERLAIN 10 BRIDGE OVER CHAMBERLAIN RUN, BRIDGE 11 REPLACEMENT 285,000 12 (BASE CONSTRUCTION ALLOCATION - 13 $255,000) 14 (DESIGN AND CONTINGENCIES - $30,000) 15 (17) SMITH TOWNSHIP, T-843, DUNBAR BRIDGE 16 OVER RACCOON CREEK, BRIDGE REPLACEMENT 285,000 17 (BASE CONSTRUCTION ALLOCATION - 18 $255,000) 19 (DESIGN AND CONTINGENCIES - $30,000) 20 (18) CITY OF WASHINGTON, HANNA STREET 21 BRIDGE OVER CATFISH CREEK, BRIDGE 22 REPLACEMENT 40,000 23 (BASE CONSTRUCTION ALLOCATION - 24 $30,000) 25 (DESIGN AND CONTINGENCIES - $10,000) 26 (19) CITY OF WASHINGTON, ROSEWOOD AVENUE 27 BRIDGE OVER CATFISH CREEK, BRIDGE 28 REPLACEMENT 40,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $30,000) 19970H0030B0757 - 289 -
1 (DESIGN AND CONTINGENCIES - $10,000) 2 (20) WEST PIKE RUN TOWNSHIP, T-840, SUZY 3 LANE OVER PIKE RUN CREEK, BRIDGE 4 REPLACEMENT 230,000 5 (BASE CONSTRUCTION ALLOCATION - 6 $210,000) 7 (DESIGN AND CONTINGENCIES - $20,000) 8 (21) CALIFORNIA BOROUGH, DAISYTOWN BRIDGE 9 OVER PIKE RUN, BRIDGE REPLACEMENT 925,000 10 (BASE CONSTRUCTION ALLOCATION - 11 $700,000) 12 (LAND ALLOCATION - $50,000) 13 (DESIGN AND CONTINGENCIES - $175,000) 14 (22) COAL CENTER BOROUGH, WATER STREET 15 BRIDGE OVER PIKE RUN, BRIDGE 16 REPLACEMENT 1,588,000 17 (BASE CONSTRUCTION ALLOCATION - 18 $1,288,000) 19 (LAND ALLOCATION - $50,000) 20 (DESIGN AND CONTINGENCIES - $250,000) 21 (23) WEST PIKE RUN TOWNSHIP, T-948 OVER 22 PIKE RUN, BRIDGE REPLACEMENT 1,075,000 23 (BASE CONSTRUCTION ALLOCATION - 24 $850,000) 25 (LAND ALLOCATION - $50,0000) 26 (DESIGN AND CONTINGENCIES - $175,000) 27 (24) MIDWAY BOROUGH, NORTH AVENUE OVER 28 ROBINSON RUN CREEK, BRIDGE REPLACEMENT 95,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $55,000) 19970H0030B0757 - 290 -
1 (LAND ALLOCATION - $20,000) 2 (DESIGN AND CONTINGENCIES - $20,000) 3 (25) CANONSBURG BOROUGH, ADAMS STREET OVER 4 BRUSH RUN, BRIDGE REPLACEMENT 176,000 5 (BASE CONSTRUCTION ALLOCATION - 6 $150,000) 7 (LAND ALLOCATION - $1,000) 8 (DESIGN AND CONTINGENCIES - $25,000) 9 (26) EAST FINLEY TOWNSHIP, T-375, COUNTY 10 BRIDGE NO. 32 OVER TEMPLETON FORK, 11 BRIDGE REPLACEMENT 355,000 12 (BASE CONSTRUCTION ALLOCATION - 13 $300,000) 14 (LAND ALLOCATION - $5,000) 15 (DESIGN AND CONTINGENCIES - $50,000) 16 (B) STATE BRIDGES 17 (1) SR 0018, BRIDGE OVER ABANDONED 18 RAILROAD, CITY OF WASHINGTON, BRIDGE 19 REPLACEMENT 650,000 20 (BASE CONSTRUCTION ALLOCATION - 21 $500,000) 22 (LAND ALLOCATION - $25,000) 23 (DESIGN AND CONTINGENCIES - $125,000) 24 (2) SR 0019, BRIDGE OVER CHARTIERS CREEK, 25 NORTH STRABANE AND PETERS TOWNSHIPS, 26 BRIDGE PAINTING 161,000 27 (BASE CONSTRUCTION ALLOCATION - 28 $156,000) 29 (DESIGN AND CONTINGENCIES - $5,000) 30 (3) SR 0070, I-70 WESTBOUND BRIDGE OVER SR 19970H0030B0757 - 291 -
1 3009, BUFFALO TOWNSHIP, BRIDGE 2 PAINTING 148,000 3 (BASE CONSTRUCTION ALLOCATION - 4 $143,000) 5 (DESIGN AND CONTINGENCIES - $5,000) 6 (4) SR 0070, I-70 EASTBOUND BRIDGE OVER SR 7 3009, BUFFALO TOWNSHIP, BRIDGE 8 PAINTING 163,000 9 (BASE CONSTRUCTION ALLOCATION - 10 $158,000) 11 (DESIGN AND CONTINGENCIES - $5,000) 12 (5) SR 0070, I-70 BRIDGE OVER 8TH STREET, 13 DONEGAL TOWNSHIP, BRIDGE REPLACEMENT 2,486,000 14 (BASE CONSTRUCTION ALLOCATION - 15 $2,211,000) 16 (LAND ALLOCATION - $25,000) 17 (DESIGN AND CONTINGENCIES - $250,000) 18 (6) SR 0070, I-70 BRIDGE OVER TURNBACK 19 ROAD, SOUTH STRABANE TOWNSHIP, BRIDGE 20 REHABILITATION 990,000 21 (BASE CONSTRUCTION ALLOCATION - 22 $750,000) 23 (LAND ALLOCATION - $40,000) 24 (DESIGN AND CONTINGENCIES - $200,000) 25 (7) SR 0070, I-70 BRIDGE OVER SR 0519, 26 SOMERSET TOWNSHIP, BRIDGE 27 REHABILITATION 2,000,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $1,720,000) 30 (LAND ALLOCATION - $40,000) 19970H0030B0757 - 292 -
1 (DESIGN AND CONTINGENCIES - $240,000) 2 (8) SR 0070, I-70 BRIDGE OVER SR 2017, 3 SOMERSET TOWNSHIP, BRIDGE 4 REHABILITATION 1,105,000 5 (BASE CONSTRUCTION ALLOCATION - 6 $865,000) 7 (LAND ALLOCATION - $40,000) 8 (DESIGN AND CONTINGENCIES - $200,000) 9 (9) SR 0088, CHARLEROI BRIDGE OVER MAPLE 10 CREEK, CHARLEROI AND SPEERS BOROUGHS, 11 BRIDGE REPLACEMENT 725,000 12 (BASE CONSTRUCTION ALLOCATION - 13 $500,000) 14 (LAND ALLOCATION - $25,000) 15 (DESIGN AND CONTINGENCIES - $200,000) 16 (10) SR 0088, BRIDGE OVER PETERS CREEK, 17 FINLEYVILLE BOROUGH, BRIDGE PAINTING 65,000 18 (BASE CONSTRUCTION ALLOCATION - 19 $65,000) 20 (11) SR 0917, PIGEON CREEK BRIDGE OVER 21 BRANCH OF PIGEON CREEK, BENTLEYVILLE 22 BOROUGH, BRIDGE REPLACEMENT 570,000 23 (BASE CONSTRUCTION ALLOCATION - 24 $370,000) 25 (LAND ALLOCATION - $25,000) 26 (DESIGN AND CONTINGENCIES - $175,000) 27 (12) SR 1005, BRIDGE OVER MILLERS RUN, 28 CECIL TOWNSHIP, BRIDGE PAINTING 75,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $75,000) 19970H0030B0757 - 293 -
1 (13) SR 1022, DONORA WEBSTER BRIDGE OVER 2 MONONGAHELA RIVER AND CONRAIL, DONORA 3 BOROUGH, BRIDGE REPLACEMENT 20,000,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $15,000,000) 6 (LAND ALLOCATION - $3,000,000) 7 (DESIGN AND CONTINGENCIES - $2,000,000) 8 (14) SR 1077, DONORA-MONESSEN BRIDGE OVER 9 MONONGAHELA RIVER, PA 837 AND 906 AND 10 RAILROAD, DONORA BOROUGH, BRIDGE 11 PAINTING 1,000,000 12 (BASE CONSTRUCTION ALLOCATION - 13 $1,000,000) 14 (15) SR 2005, SOWERS RUN BRIDGE OVER 15 SOWERS RUN, AMWELL TOWNSHIP, BRIDGE 16 REPLACEMENT 435,000 17 (BASE CONSTRUCTION ALLOCATION - 18 $235,000) 19 (LAND ALLOCATION - $25,000) 20 (DESIGN AND CONTINGENCIES - $175,000) 21 (16) SR 2011, BRIDGE OVER BRANCH OF LITTLE 22 TENMILE CREEK, WEST BETHLEHEM TOWNSHIP, 23 BRIDGE REPLACEMENT 460,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $260,000) 26 (LAND ALLOCATION - $25,000) 27 (DESIGN AND CONTINGENCIES - $175,000) 28 (17) SR 2030, GORBY'S BRIDGE II OVER GORBY 29 RUN, CALIFORNIA BOROUGH, BRIDGE 30 REHABILITATION 300,000 19970H0030B0757 - 294 -
1 (BASE CONSTRUCTION ALLOCATION - 2 $300,000) 3 (18) SR 2037, MAPLE CREEK BRIDGE OVER 4 BRANCH OF MAPLE CREEK, FALLOWFIELD 5 TOWNSHIP, BRIDGE REPLACEMENT 486,000 6 (BASE CONSTRUCTION ALLOCATION - 7 $286,000) 8 (LAND ALLOCATION - $25,000) 9 (DESIGN AND CONTINGENCIES - $175,000) 10 (19) SR 3009, BUFFALO ARCH BRIDGE OVER 11 BRANCH OF BUFFALO CREEK AND RAILROAD, 12 BUFFALO TOWNSHIP, BRIDGE REPLACEMENT 535,000 13 (BASE CONSTRUCTION ALLOCATION - 14 $300,000) 15 (LAND ALLOCATION - $10,000) 16 (DESIGN AND CONTINGENCIES - $225,000) 17 (20) SR 4015, BRIDGE OVER CHERRY RUN, 18 MOUNT PLEASANT TOWNSHIP, BRIDGE 19 PAINTING 53,000 20 (BASE CONSTRUCTION ALLOCATION - 21 $51,000) 22 (DESIGN AND CONTINGENCIES - $2,000) 23 (21) SR 4022, CHARTIERS CREEK BRIDGE NO.2 24 OVER BRANCH OF CHARTIERS CREEK, CANTON 25 TOWNSHIP, BRIDGE REPLACEMENT 415,000 26 (BASE CONSTRUCTION ALLOCATION - 27 $215,000) 28 (LAND ALLOCATION - $25,000) 29 (DESIGN AND CONTINGENCIES - $175,000) 30 (22) SR 4022, CHARTIERS CREEK BRIDGE NO.1 19970H0030B0757 - 295 -
1 OVER BRANCH OF CHARTIERS CREEK, CANTON 2 TOWNSHIP, BRIDGE REPLACEMENT 405,000 3 (BASE CONSTRUCTION ALLOCATION - 4 $205,000) 5 (LAND ALLOCATION - $25,000) 6 (DESIGN AND CONTINGENCIES - $175,000) 7 (23) SR 2034, SR 2034 OVER BRANCH OF PIKE 8 RUN, WEST PIKE RUN TOWNSHIP, BRIDGE 9 REPLACEMENT 438,000 10 (BASE CONSTRUCTION ALLOCATION - 11 $313,000) 12 (LAND ALLOCATION - $25,000) 13 (DESIGN AND CONTINGENCIES - $100,000) 14 (24) SR 2079, SR 2079 OVER PIKE RUN, WEST 15 PIKE RUN TOWNSHIP, BRIDGE REPLACEMENT 988,000 16 (BASE CONSTRUCTION ALLOCATION - 17 $788,000) 18 (LAND ALLOCATION - $50,000) 19 (DESIGN AND CONTINGENCIES - $150,000) 20 (25) SR 2030, BRIDGE NO.1 OVER GORBY RUN, 21 CALIFORNIA BOROUGH, BRIDGE REPLACEMENT 430,000 22 (BASE CONSTRUCTION ALLOCATION - 23 $330,000) 24 (DESIGN AND CONTINGENCIES - $100,000) 25 SECTION 68. WAYNE COUNTY. 26 (A) LOCAL BRIDGES (RESERVED) 27 (B) STATE BRIDGES 28 (1) SR 0371, COCHECTON BRIDGE NO.6 OVER 29 DELAWARE RIVER, DAMASCUS TOWNSHIP, 30 BRIDGE REHABILITATION 1,050,000 19970H0030B0757 - 296 -
1 (BASE CONSTRUCTION ALLOCATION - 2 $950,000) 3 (DESIGN AND CONTINGENCIES - $100,000) 4 (2) SR 0380, I-380 BRIDGE OVER LEHIGH 5 RIVER, LEHIGH TOWNSHIP, BRIDGE 6 REHABILITATION 284,000 7 (BASE CONSTRUCTION ALLOCATION - 8 $244,000) 9 (DESIGN AND CONTINGENCIES - $40,000) 10 (3) SR 4009, QUARRY BRIDGE OVER DYBERRY 11 CREEK, DYBERRY TOWNSHIP, BRIDGE 12 REPLACEMENT 660,000 13 (BASE CONSTRUCTION ALLOCATION - 14 $500,000) 15 (LAND ALLOCATION - $10,000) 16 (DESIGN AND CONTINGENCIES - $150,000) 17 (4) SR 0371, BRIDGE NO.6, DAMASCUS 18 TOWNSHIP, BRIDGE PAINTING 2,200,000 19 (BASE CONSTRUCTION ALLOCATION - 20 $2,000,000) 21 (DESIGN AND CONTINGENCIES - $200,000) 22 (5) SR 1020, BRIDGE NO.7 OVER DELAWARE 23 RIVER, DAMASCUS TOWNSHIP, BRIDGE 24 PAINTING 3,300,000 25 (BASE CONSTRUCTION ALLOCATION - 26 $3,000,000) 27 (DESIGN AND CONTINGENCIES - $300,000) 28 (6) SR 1004, BRIDGE OVER OUTLET OF BEACH 29 LAKE, INTERSECTION OF SR 1011, BERLIN 30 TOWNSHIP, BRIDGE REPLACEMENT 345,000 19970H0030B0757 - 297 -
1 (BASE CONSTRUCTION ALLOCATION - 2 $265,000) 3 (LAND ALLOCATION - $10,000) 4 (DESIGN AND CONTINGENCIES - $70,000) 5 (7) SR 3028, BRIDGE OVER TR 191, EAST OF 6 SR 3031, CHERRY RIDGE TOWNSHIP, BRIDGE 7 REPLACEMENT 450,000 8 (BASE CONSTRUCTION ALLOCATION - 9 $350,000) 10 (LAND ALLOCATION - $10,000) 11 (DESIGN AND CONTINGENCIES - $90,000) 12 (8) STATE BRIDGES, COUNTYWIDE BRIDGE ZONE 13 PAINTING, BRIDGE PAINTING 370,000 14 (BASE CONSTRUCTION ALLOCATION - 15 $350,000) 16 (LAND ALLOCATION - $10,000) 17 (DESIGN AND CONTINGENCIES - $10,000) 18 (9) SR 1004, SR 1004 OVER OUTLET OF BEACH 19 LAKE, BERLIN TOWNSHIP, BRIDGE 20 REPLACEMENT 260,000 21 (BASE CONSTRUCTION ALLOCATION - 22 $220,000) 23 (LAND ALLOCATION - $10,000) 24 (DESIGN AND CONTINGENCIES - $30,000) 25 (10) SR 3028, SR 3028 OVER TR 191, CHERRY 26 RIDGE TOWNSHIP, BRIDGE REPLACEMENT 400,000 27 (BASE CONSTRUCTION ALLOCATION - 28 $340,000) 29 (LAND ALLOCATION - $10,000) 30 (DESIGN AND CONTINGENCIES - $50,000) 19970H0030B0757 - 298 -
1 SECTION 69. WESTMORELAND COUNTY. 2 (A) LOCAL BRIDGES 3 (1) HEMPFIELD TOWNSHIP, AIRPORT HILL ROAD 4 BRIDGE OVER SLATE CREEK, BRIDGE 5 REPLACEMENT 350,000 6 (BASE CONSTRUCTION ALLOCATION - 7 $280,000) 8 (LAND ALLOCATION - $10,000) 9 (DESIGN AND CONTINGENCIES - $60,000) 10 (2) HEMPFIELD TOWNSHIP, SWEITZER ROAD 11 BRIDGE OVER SEWICKLEY CREEK, BRIDGE 12 REPLACEMENT 975,000 13 (BASE CONSTRUCTION ALLOCATION - 14 $800,000) 15 (LAND ALLOCATION - $15,000) 16 (DESIGN AND CONTINGENCIES - $160,000) 17 (3) HEMPFIELD TOWNSHIP, LADYSMITH ROAD 18 BRIDGE OVER LITTLE SEWICKLEY CREEK, 19 BRIDGE REPLACEMENT 813,000 20 (BASE CONSTRUCTION ALLOCATION - 21 $613,000) 22 (LAND ALLOCATION - $50,000) 23 (DESIGN AND CONTINGENCIES - $150,000) 24 (4) HEMPFIELD TOWNSHIP, OLD ROUTE 30 25 BRIDGE OVER SLATE CREEK, BRIDGE 26 REPLACEMENT 370,000 27 (BASE CONSTRUCTION ALLOCATION - 28 $300,000) 29 (LAND ALLOCATION - $10,000) 30 (DESIGN AND CONTINGENCIES - $60,000) 19970H0030B0757 - 299 -
1 (5) HEMPFIELD TOWNSHIP, OLD ROUTE 119 2 BRIDGE OVER TRIBUTARY OF JACKS RUN, 3 BRIDGE REPLACEMENT 428,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $288,000) 6 (LAND ALLOCATION - $15,000) 7 (DESIGN AND CONTINGENCIES - $125,000) 8 (6) JEANETTE CITY, 6TH STREET BRIDGE OVER 9 BRUSH CREEK, BRIDGE REPLACEMENT 460,000 10 (BASE CONSTRUCTION ALLOCATION - 11 $340,000) 12 (LAND ALLOCATION - $20,000) 13 (DESIGN AND CONTINGENCIES - $100,000) 14 (7) LIGONIER TOWNSHIP, T-605 BRIDGE OVER 15 TWO MILE RUN, BRIDGE REPLACEMENT 320,000 16 (BASE CONSTRUCTION ALLOCATION - 17 $200,000) 18 (LAND ALLOCATION - $20,000) 19 (DESIGN AND CONTINGENCIES - $100,000) 20 (8) LIGONIER TOWNSHIP, T-617, BRIDGE OVER 21 MILL RUN, BRIDGE REPLACEMENT 310,000 22 (BASE CONSTRUCTION ALLOCATION - 23 $190,000) 24 (LAND ALLOCATION - $20,000) 25 (DESIGN AND CONTINGENCIES - $100,000) 26 (9) HEMPFIELD TOWNSHIP, POSSUM HOLLOW ROAD 27 BRIDGE OVER TRIBUTARY OF LITTLE 28 SEWICKLEY CREEK, BRIDGE REPLACEMENT 428,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $288,000) 19970H0030B0757 - 300 -
1 (LAND ALLOCATION - $15,000) 2 (DESIGN AND CONTINGENCIES - $125,000) 3 (10) SOUTH HUNTINGTON TOWNSHIP, T-390, 4 WILLIAMS ROAD BRIDGE, BRIDGE 5 REPLACEMENT 125,000 6 (BASE CONSTRUCTION ALLOCATION - 7 $100,000) 8 (LAND ALLOCATION - $5,000) 9 (DESIGN AND CONTINGENCIES - $20,000) 10 (11) SOUTH HUNTINGTON TOWNSHIP, T-562, 11 J.D. SMITH ROAD BRIDGE, BRIDGE 12 REPLACEMENT 155,000 13 (BASE CONSTRUCTION ALLOCATION - 14 $125,000) 15 (LAND ALLOCATION - $5,000) 16 (DESIGN AND CONTINGENCIES - $25,000) 17 (12) SOUTH HUNTINGTON TOWNSHIP, T-386, 18 BRIDGE NO. 1, MOUNT ETNA ROAD BRIDGE, 19 BRIDGE REPLACEMENT 145,000 20 (BASE CONSTRUCTION ALLOCATION - 21 $115,000) 22 (LAND ALLOCATION - $5,000) 23 (DESIGN AND CONTINGENCIES - $25,000) 24 (13) SOUTH HUNTINGTON TOWNSHIP, T-386, 25 BRIDGE NO.2, MOUNT ETNA ROAD AT REMO 26 ROAD, BRIDGE REPLACEMENT 135,000 27 (BASE CONSTRUCTION ALLOCATION - 28 $110,000) 29 (LAND ALLOCATION - $5,000) 30 (DESIGN AND CONTINGENCIES - $20,000) 19970H0030B0757 - 301 -
1 (14) SOUTH HUNTINGTON TOWNSHIP, T-385, 2 COMMER ROAD BRIDGE, BRIDGE REPLACEMENT 150,000 3 (BASE CONSTRUCTION ALLOCATION - 4 $120,000) 5 (LAND ALLOCATION - $5,000) 6 (DESIGN AND CONTINGENCIES - $25,000) 7 (15) WASHINGTON TOWNSHIP, T-979, PLEASANT 8 VIEW ROAD BRIDGE OVER BEAVER RUN, 9 BRIDGE REPLACEMENT 385,000 10 (BASE CONSTRUCTION ALLOCATION - 11 $265,000) 12 (LAND ALLOCATION - $20,000) 13 (DESIGN AND CONTINGENCIES - $100,000) 14 (16) DERRY TOWNSHIP, T-924, BRIDGE OVER 15 UNION RUN, BRIDGE REPLACEMENT 578,000 16 (BASE CONSTRUCTION ALLOCATION - 17 $463,000) 18 (LAND ALLOCATION - $15,000) 19 (DESIGN AND CONTINGENCIES - $100,000) 20 (17) DERRY TOWNSHIP, T-937, BRIDGE OVER 21 STONY RUN, BRIDGE REPLACEMENT 553,000 22 (BASE CONSTRUCTION ALLOCATION - 23 $438,000) 24 (LAND ALLOCATION - $15,000) 25 (DESIGN AND CONTINGENCIES - $100,000) 26 (18) DERRY TOWNSHIP, T-941, BRIDGE OVER 27 STONY RUN, BRIDGE REPLACEMENT 590,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $475,000) 30 (LAND ALLOCATION - $15,000) 19970H0030B0757 - 302 -
1 (DESIGN AND CONTINGENCIES - $100,000) 2 (19) DONEGAL TOWNSHIP, T-916, BRIDGE OVER 3 INDIAN CREEK, BRIDGE REPLACEMENT 465,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $350,000) 6 (LAND ALLOCATION - $15,000) 7 (DESIGN AND CONTINGENCIES - $100,000) 8 (20) DONEGAL TOWNSHIP, T-880, BRIDGE OVER 9 FOUR MILE RUN, BRIDGE NO.3, BRIDGE 10 REPLACEMENT 415,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $300,000) 13 (LAND ALLOCATION - $15,000) 14 (DESIGN AND CONTINGENCIES - $100,000) 15 (21) DONEGAL TOWNSHIP, T-880, BRIDGE OVER 16 FOUR MILE RUN, BRIDGE NO.5, BRIDGE 17 REPLACEMENT 415,000 18 (BASE CONSTRUCTION ALLOCATION - 19 $300,000) 20 (LAND ALLOCATION - $15,000) 21 (DESIGN AND CONTINGENCIES - $100,000) 22 (22) FAIRFIELD TOWNSHIP, T-739, BERKEY'S 23 BRIDGE OVER UNNAMED TRIBUTARY, BRIDGE 24 REPLACEMENT 200,000 25 (BASE CONSTRUCTION ALLOCATION - 26 $170,000) 27 (LAND ALLOCATION - $10,000) 28 (DESIGN AND CONTINGENCIES - $20,000) 29 (23) FAIRFIELD TOWNSHIP, T-847, BAILEY'S 30 BRIDGE OVER HENDRICKS RUN, BRIDGE 19970H0030B0757 - 303 -
1 REPLACEMENT 200,000 2 (BASE CONSTRUCTION ALLOCATION - 3 $170,000) 4 (LAND ALLOCATION - $10,000) 5 (DESIGN AND CONTINGENCIES - $20,000) 6 (24) FAIRFIELD TOWNSHIP, T-847, TOBY 7 BRIDGE OVER UNNAMED TRIBUTARY, BRIDGE 8 REPLACEMENT 200,000 9 (BASE CONSTRUCTION ALLOCATION - 10 $170,000) 11 (LAND ALLOCATION - $10,000) 12 (DESIGN AND CONTINGENCIES - $20,000) 13 (25) FAIRFIELD TOWNSHIP, T-931, PATTERSON 14 BRIDGE NO.1 OVER BEAR POND RUN, BRIDGE 15 REPLACEMENT 200,000 16 (BASE CONSTRUCTION ALLOCATION - 17 $170,000) 18 (LAND ALLOCATION - $10,000) 19 (DESIGN AND CONTINGENCIES - $20,000) 20 (26) FAIRFIELD TOWNSHIP, T-984, LOVE 21 HOLLOW BRIDGE NO.1 OVER HENDRICKS RUN, 22 BRIDGE REPLACEMENT 200,000 23 (BASE CONSTRUCTION ALLOCATION - 24 $170,000) 25 (LAND ALLOCATION - $10,000) 26 (DESIGN AND CONTINGENCIES - $20,000) 27 (27) FAIRFIELD TOWNSHIP, T-984, LOVE 28 HOLLOW BRIDGE NO.2 OVER HENDRICKS RUN, 29 BRIDGE REPLACEMENT 200,000 30 (BASE CONSTRUCTION ALLOCATION - 19970H0030B0757 - 304 -
1 $170,000) 2 (LAND ALLOCATION - $10,000) 3 (DESIGN AND CONTINGENCIES - $20,000) 4 (28) FAIRFIELD TOWNSHIP, T-988, YEAGER 5 HOLLOW BRIDGE NO.1 OVER UNNAMED 6 TRIBUTARY, BRIDGE REPLACEMENT 200,000 7 (BASE CONSTRUCTION ALLOCATION - 8 $170,000) 9 (LAND ALLOCATION - $10,000) 10 (DESIGN AND CONTINGENCIES - $20,000) 11 (29) FAIRFIELD TOWNSHIP, T-988, YEAGER 12 HOLLOW BRIDGE NO.2 OVER UNNAMED 13 TRIBUTARY, BRIDGE REPLACEMENT 200,000 14 (BASE CONSTRUCTION ALLOCATION - 15 $170,000) 16 (LAND ALLOCATION - $10,000) 17 (DESIGN AND CONTINGENCIES - $20,000) 18 (30) FAIRFIELD TOWNSHIP, T-990, PATTERSON 19 BRIDGE NO.2 OVER UNNAMED TRIBUTARY, 20 BRIDGE REPLACEMENT 200,000 21 (BASE CONSTRUCTION ALLOCATION - 22 $170,000) 23 (LAND ALLOCATION - $10,000) 24 (DESIGN AND CONTINGENCIES - $20,000) 25 (31) LIGONIER TOWNSHIP, T-505, HORNER HILL 26 ROAD OVER LAUGHLINTOWN RUN, BRIDGE 27 REPLACEMENT 175,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $125,000) 30 (LAND ALLOCATION - $15,000) 19970H0030B0757 - 305 -
1 (DESIGN AND CONTINGENCIES - $35,000) 2 (32) LIGONIER TOWNSHIP, T-607, WELLER ROAD 3 OVER UNNAMED STREAM, BRIDGE 4 REPLACEMENT 10,000 5 (BASE CONSTRUCTION ALLOCATION - $8,000) 6 (DESIGN AND CONTINGENCIES - $2,000) 7 (33) LIGONIER TOWNSHIP, T-617, ROBB ROAD 8 OVER HANNAS RUN, BRIDGE REPLACEMENT 310,000 9 (BASE CONSTRUCTION ALLOCATION - 10 $250,000) 11 (LAND ALLOCATION - $10,000) 12 (DESIGN AND CONTINGENCIES - $50,000) 13 (34) LIGONIER TOWNSHIP, T-719, PEOPLES 14 ROAD OVER UNNAMED STREAM, BRIDGE 15 REPLACEMENT 100,000 16 (BASE CONSTRUCTION ALLOCATION - 17 $75,000) 18 (LAND ALLOCATION - $5,000) 19 (DESIGN AND CONTINGENCIES - $20,000) 20 (35) LIGONIER TOWNSHIP, T-721, BRIDGE OVER 21 NORTH FORK OF TROUT RUN, BRIDGE 22 REPLACEMENT 200,000 23 (BASE CONSTRUCTION ALLOCATION - 24 $125,000) 25 (LAND ALLOCATION - $10,000) 26 (DESIGN AND CONTINGENCIES - $65,000) 27 (36) LIGONIER TOWNSHIP, T-942, ZION CHURCH 28 ROAD OVER UNNAMED STREAM, BRIDGE 29 REPLACEMENT 50,000 30 (BASE CONSTRUCTION ALLOCATION - 19970H0030B0757 - 306 -
1 $35,000) 2 (LAND ALLOCATION - $5,000) 3 (DESIGN AND CONTINGENCIES - $10,000) 4 (37) LIGONIER TOWNSHIP, T-984, MILL ROAD 5 OVER MILL RACE, BRIDGE REPLACEMENT 50,000 6 (BASE CONSTRUCTION ALLOCATION - 7 $35,000) 8 (LAND ALLOCATION - $5,000) 9 (DESIGN AND CONTINGENCIES - $10,000) 10 (38) LIGONIER TOWNSHIP, T-950, OLD LINCOLN 11 HIGHWAY EAST OVER UNNAMED STREAM, 12 BRIDGE REHABILITATION 25,000 13 (BASE CONSTRUCTION ALLOCATION - 14 $20,000) 15 (DESIGN AND CONTINGENCIES - $5,000) 16 (39) LIGONIER TOWNSHIP, T-984, HARVEY ROAD 17 OVER MACKS RUN, BRIDGE REHABILITATION 5,000 18 (BASE CONSTRUCTION ALLOCATION - $4,000) 19 (DESIGN AND CONTINGENCIES - $1,000) 20 (40) SAINT CLAIR TOWNSHIP, T-994, BRIDGE 21 OVER TUBMILL CREEK, BRIDGE REPLACEMENT 440,000 22 (BASE CONSTRUCTION ALLOCATION - 23 $325,000) 24 (LAND ALLOCATION - $15,000) 25 (DESIGN AND CONTINGENCIES - $100,000) 26 (41) SEWICKLEY TOWNSHIP, T-318, BRIDGE 27 NO.3 OVER TRIBUTARY OF YOUGHIOGHENY 28 RIVER, BRIDGE REPLACEMENT 100,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $70,000) 19970H0030B0757 - 307 -
1 (LAND ALLOCATION - $5,000) 2 (DESIGN AND CONTINGENCIES - $25,000) 3 (42) DERRY TOWNSHIP, CONRAIL OVERPASS OVER 4 SR 0981, BRIDGE REPLACEMENT 1,600,000 5 (BASE CONSTRUCTION ALLOCATION - 6 $1,200,000) 7 (LAND ALLOCATION - $200,000) 8 (DESIGN AND CONTINGENCIES - $200,000) 9 (43) HEMPFIELD TOWNSHIP, T-399 OVER JACKS 10 RUN, BRIDGE REPLACEMENT 428,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $288,000) 13 (LAND ALLOCATION - $15,000) 14 (DESIGN AND CONTINGENCIES - $125,000) 15 (44) HEMPFIELD TOWNSHIP, T-550 OVER 16 TRIBUTARY TO LITTLE SEWICKLEY CREEK, 17 BRIDGE REPLACEMENT 428,000 18 (BASE CONSTRUCTION ALLOCATION - 19 $288,000) 20 (LAND ALLOCATION - $15,000) 21 (DESIGN AND CONTINGENCIES - $125,000) 22 (45) LIGONIER TOWNSHIP, T-984 OVER MILL 23 CREEK, BRIDGE REPLACEMENT 650,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $450,000) 26 (LAND ALLOCATION - $50,000) 27 (DESIGN AND CONTINGENCIES - $150,000) 28 (46) SALEM TOWNSHIP, T-881, BRIDGE OVER 29 LOYALHANNA CREEK, BRIDGE REPLACEMENT 81,000 30 (BASE CONSTRUCTION ALLOCATION - 19970H0030B0757 - 308 -
1 $67,000) 2 (DESIGN AND CONTINGENCIES - $14,000) 3 (47) SEWICKLEY TOWNSHIP, T-633, GREEN 4 HILLS ROAD BRIDGE OVER LITTLE SEWICKLEY 5 CREEK, BRIDGE REPLACEMENT 465,000 6 (BASE CONSTRUCTION ALLOCATION - 7 $325,000) 8 (LAND ALLOCATION - $15,000) 9 (DESIGN AND CONTINGENCIES - $125,000) 10 (B) STATE BRIDGES 11 (1) SR 0030, MILL CREEK BRIDGE OVER MILL 12 CREEK, LIGONIER TOWNSHIP, BRIDGE 13 REPLACEMENT 910,000 14 (BASE CONSTRUCTION ALLOCATION - 15 $710,000) 16 (LAND ALLOCATION - $25,000) 17 (DESIGN AND CONTINGENCIES - $175,000) 18 (2) SR 0031, JACOBS CREEK BRIDGE OVER 19 JACOBS CREEK, MOUNT PLEASANT AND 20 BULLSKIN TOWNSHIPS, BRIDGE REPLACEMENT 715,000 21 (BASE CONSTRUCTION ALLOCATION - 22 $500,000) 23 (LAND ALLOCATION - $40,000) 24 (DESIGN AND CONTINGENCIES - $175,000) 25 (3) SR0056, SEWARD BRIDGE OVER CONRAIL AND 26 LOCAL ROAD, ST. CLAIR TOWNSHIP, BRIDGE 27 PAINTING 600,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $600,000) 30 (4) SR 0070, I-70 BRIDGE OVER N&W 19970H0030B0757 - 309 -
1 RAILROAD, ROSTRAVER TOWNSHIP, BRIDGE 2 REHABILITATION 1,565,000 3 (BASE CONSTRUCTION ALLOCATION - 4 $1,305,000) 5 (LAND ALLOCATION - $60,000) 6 (DESIGN AND CONTINGENCIES - $200,000) 7 (5) SR 0070, I-70 BRIDGE OVER CONRAIL, 8 SOUTH HUNTINGTON TOWNSHIP, BRIDGE 9 REHABILITATION 3,125,000 10 (BASE CONSTRUCTION ALLOCATION - 11 $2,780,000) 12 (LAND ALLOCATION - $45,000) 13 (DESIGN AND CONTINGENCIES - $300,000) 14 (6) SR 0119, CRABTREE CREEK BRIDGE NO.2 15 OVER CRABTREE CREEK, HEMPFIELD 16 TOWNSHIP, BRIDGE REPLACEMENT 577,000 17 (BASE CONSTRUCTION ALLOCATION - 18 $377,000) 19 (LAND ALLOCATION - $25,000) 20 (DESIGN AND CONTINGENCIES - $175,000) 21 (7) SR 0136, WEST NEWTON BRIDGE OVER 22 YOUGHIOGHENY RIVER, WEST NEWTON 23 BOROUGH, BRIDGE PAINTING 250,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $250,000) 26 (8) SR 0259, BOLIVER UNDERPASS CONRAIL 27 RAILROAD OVER SR 0259, FAIRFIELD 28 TOWNSHIP, BRIDGE REPLACEMENT 310,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $200,000) 19970H0030B0757 - 310 -
1 (LAND ALLOCATION - $10,000) 2 (DESIGN AND CONTINGENCIES - $100,000) 3 (9) SR 0271, BRIDGE OVER MILL CREEK, 4 LIGONIER TOWNSHIP, BRIDGE PAINTING 87,000 5 (BASE CONSTRUCTION ALLOCATION - 6 $87,000) 7 (10) SR 0711, BRIDGE OVER MILL CREEK, 8 LIGONIER TOWNSHIP, BRIDGE PAINTING 125,000 9 (BASE CONSTRUCTION ALLOCATION - 10 $125,000) 11 (11) SR 0819, BRIDGE OVER STAUFFER BRIDGE, 12 SCOTTDALE BOROUGH, BRIDGE PAINTING 92,000 13 (BASE CONSTRUCTION ALLOCATION - 14 $92,000) 15 (12) SR 0981, BRIDGE OVER BRANCH OF BARRON 16 RUN, SOUTH HUNTINGTON TOWNSHIP, BRIDGE 17 REPLACEMENT 250,000 18 (BASE CONSTRUCTION ALLOCATION - 19 $250,000) 20 (13) SR 0982, BRADENVILLE BRIDGE OVER 21 SAXMAN RUN, DERRY TOWNSHIP, BRIDGE 22 REPLACEMENT 330,000 23 (BASE CONSTRUCTION ALLOCATION - 24 $330,000) 25 (14) SR 1027, STONEY RUN BRIDGE OVER 26 STONEY RUN, DERRY TOWNSHIP, BRIDGE 27 REPLACEMENT 340,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $255,000) 30 (LAND ALLOCATION - $10,000) 19970H0030B0757 - 311 -
1 (DESIGN AND CONTINGENCIES - $75,000) 2 (15) SR 2008, FOURMILE RUN BRIDGE OVER 3 FOURMILE RUN, COOK TOWNSHIP, BRIDGE 4 PAINTING 83,000 5 (BASE CONSTRUCTION ALLOCATION - 6 $83,000) 7 (16) SR 2010, BRIDGE OVER BRANCH OF BOYER 8 RUN, MOUNT PLEASANT TOWNSHIP, BRIDGE 9 REPLACEMENT 450,000 10 (BASE CONSTRUCTION ALLOCATION - 11 $250,000) 12 (LAND ALLOCATION - $25,000) 13 (DESIGN AND CONTINGENCIES - $175,000) 14 (17) SR 8036, NEW STANTON RAMP BRIDGE OVER 15 SR 3091, NEW STANTON BOROUGH, BRIDGE 16 REHABILITATION 475,000 17 (BASE CONSTRUCTION ALLOCATION - 18 $395,000) 19 (DESIGN AND CONTINGENCIES - $80,000) 20 (18) SR 0030, SR 0030 OVER MILL CREEK, 21 LIGONIER TOWNSHIP, BRIDGE 22 REHABILITATION 200,000 23 (BASE CONSTRUCTION ALLOCATION - 24 $150,000) 25 (DESIGN AND CONTINGENCIES - $50,000) 26 (19) SR 0030, SR 0030 OVER BRANCH OF 27 LOYALHANNA CREEK, UNITY TOWNSHIP, 28 BRIDGE REPLACEMENT 245,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $125,000) 19970H0030B0757 - 312 -
1 (LAND ALLOCATION - $20,000) 2 (DESIGN AND CONTINGENCIES - $100,000) 3 (20) SR 0217, SR 0217 OVER MILLER RUN, 4 DERRY TOWNSHIP, BRIDGE REPLACEMENT 293,000 5 (BASE CONSTRUCTION ALLOCATION - 6 $188,000) 7 (LAND ALLOCATION - $5,000) 8 (DESIGN AND CONTINGENCIES - $100,000) 9 (21) SR 0259, SR 0259 OVER BRANCH OF 10 FREEMAN RUN, FAIRFIELD TOWNSHIP, BRIDGE 11 REPLACEMENT 218,000 12 (BASE CONSTRUCTION ALLOCATION - 13 $113,000) 14 (LAND ALLOCATION - $5,000) 15 (DESIGN AND CONTINGENCIES - $100,000) 16 (22) SR 0381, SR 0381 OVER BRANCH OF 17 LOYALHANNA CREEK, COOK TOWNSHIP, BRIDGE 18 REPLACEMENT 670,000 19 (BASE CONSTRUCTION ALLOCATION - 20 $450,000) 21 (LAND ALLOCATION - $20,000) 22 (DESIGN AND CONTINGENCIES - $200,000) 23 (23) SR 0381, SR 0381 OVER CAMP RUN, 24 DONEGAL TOWNSHIP, BRIDGE REPLACEMENT 608,000 25 (BASE CONSTRUCTION ALLOCATION - 26 $388,000) 27 (LAND ALLOCATION - $20,000) 28 (DESIGN AND CONTINGENCIES - $200,000) 29 (24) SR 0711, SR 0711 OVER MILL CREEK, 30 LIGONIER TOWNSHIP, BRIDGE REPLACEMENT 600,000 19970H0030B0757 - 313 -
1 (BASE CONSTRUCTION ALLOCATION - 2 $450,000) 3 (LAND ALLOCATION - $50,000) 4 (DESIGN AND CONTINGENCIES - $100,000) 5 (25) SR 0982, SR 0982 OVER JACOBS CREEK, 6 MOUNT PLEASANT TOWNSHIP, BRIDGE 7 REPLACEMENT 938,000 8 (BASE CONSTRUCTION ALLOCATION - 9 $688,000) 10 (LAND ALLOCATION - $50,000) 11 (DESIGN AND CONTINGENCIES - $200,000) 12 (26) SR 0982, SR 0982 OVER NINE MILE RUN, 13 UNITY TOWNSHIP, BRIDGE REPLACEMENT 348,000 14 (BASE CONSTRUCTION ALLOCATION - 15 $238,000) 16 (LAND ALLOCATION - $10,000) 17 (DESIGN AND CONTINGENCIES - $100,000) 18 (27) SR 0982, SR 0982 OVER INDIAN CAMP 19 RUN, UNITY TOWNSHIP, BRIDGE 20 REPLACEMENT 335,000 21 (BASE CONSTRUCTION ALLOCATION - 22 $225,000) 23 (LAND ALLOCATION - $10,000) 24 (DESIGN AND CONTINGENCIES - $100,000) 25 (28) SR 1004, SR 1004 OVER HENDRICKS 26 CREEK, FAIRFIELD TOWNSHIP, BRIDGE 27 REPLACEMENT 200,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $170,000) 30 (LAND ALLOCATION - $10,000) 19970H0030B0757 - 314 -
1 (DESIGN AND CONTINGENCIES - $20,000) 2 (29) SR 1006, SR 1006 OVER FREEMAN RUN, 3 FAIRFIELD TOWNSHIP, BRIDGE REPLACEMENT 833,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $613,000) 6 (LAND ALLOCATION - $20,000) 7 (DESIGN AND CONTINGENCIES - $200,000) 8 (30) SR 1006, WEST BOLIVAR BRIDGE NEAR 9 TREASURE ISLAND, FAIRFIELD TOWNSHIP, 10 BRIDGE REPLACEMENT 200,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $170,000) 13 (LAND ALLOCATION - $10,000) 14 (DESIGN AND CONTINGENCIES - $20,000) 15 (31) SR 1007, SR 1007 OVER TUBMILL RUN, 16 FAIRFIELD TOWNSHIP, BRIDGE REPLACEMENT 465,000 17 (BASE CONSTRUCTION ALLOCATION - 18 $350,000) 19 (LAND ALLOCATION - $15,000) 20 (DESIGN AND CONTINGENCIES - $100,000) 21 (32) SR 1012, SR 1012 OVER BRANCH OF MEGEE 22 RUN, DERRY TOWNSHIP, BRIDGE 23 REPLACEMENT 318,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $213,000) 26 (LAND ALLOCATION - $5,000) 27 (DESIGN AND CONTINGENCIES - $100,000) 28 (33) SR 1014, SR 1014 OVER ABANDONED 29 RAILROAD, DERRY TOWNSHIP, BRIDGE 30 REPLACEMENT 268,000 19970H0030B0757 - 315 -
1 (BASE CONSTRUCTION ALLOCATION - 2 $163,000) 3 (LAND ALLOCATION - $5,000) 4 (DESIGN AND CONTINGENCIES - $100,000) 5 (34) SR 1015, SR 1015 OVER HYPOCRITE 6 CREEK, FAIRFIELD TOWNSHIP, BRIDGE 7 REPLACEMENT 200,000 8 (BASE CONSTRUCTION ALLOCATION - 9 $170,000) 10 (LAND ALLOCATION - $10,000) 11 (DESIGN AND CONTINGENCIES - $20,000) 12 (35) SR 1027, SR 1027 OVER BRANCH OF STONY 13 RUN, DERRY TOWNSHIP, BRIDGE 14 REPLACEMENT 305,000 15 (BASE CONSTRUCTION ALLOCATION - 16 $200,000) 17 (LAND ALLOCATION - $5,000) 18 (DESIGN AND CONTINGENCIES - $100,000) 19 (36) SR 1031, SR 1031 OVER MCCUNE RUN, 20 DERRY TOWNSHIP, BRIDGE REPLACEMENT 293,000 21 (BASE CONSTRUCTION ALLOCATION - 22 $188,000) 23 (LAND ALLOCATION - $5,000) 24 (DESIGN AND CONTINGENCIES - $100,000) 25 (37) SR 2006, SR 2006 OVER BRANCH OF 26 JACOBS CREEK, MT. PLEASANT TOWNSHIP, 27 BRIDGE REPLACEMENT 403,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $288,000) 30 (LAND ALLOCATION - $15,000) 19970H0030B0757 - 316 -
1 (DESIGN AND CONTINGENCIES - $100,000) 2 (38) SR 2007, SR 2007 OVER SHUPE RUN, MT. 3 PLEASANT TOWNSHIP, BRIDGE REPLACEMENT 218,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $113,000) 6 (LAND ALLOCATION - $5,000) 7 (DESIGN AND CONTINGENCIES - $100,000) 8 (39) SR 2012, SR 2012 OVER BRINKER RUN, 9 MT. PLEASANT TOWNSHIP, BRIDGE 10 REPLACEMENT 415,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $300,000) 13 (LAND ALLOCATION - $15,000) 14 (DESIGN AND CONTINGENCIES - $100,000) 15 (40) SR 2021, SR 2021 OVER SEWICKLEY 16 CREEK, MT. PLEASANT TOWNSHIP, BRIDGE 17 REPLACEMENT 1,463,000 18 (BASE CONSTRUCTION ALLOCATION - 19 $1,213,000) 20 (LAND ALLOCATION - $50,000) 21 (DESIGN AND CONTINGENCIES - $200,000) 22 (41) SR 2025, SR 2025 OVER TRIBUTARY OF 23 JACOBS CREEK, MT. PLEASANT TOWNSHIP, 24 BRIDGE REPLACEMENT 250,000 25 (BASE CONSTRUCTION ALLOCATION - 26 $225,000) 27 (DESIGN AND CONTINGENCIES - $25,000) 28 (42) SR 4034, SR 4034 OVER PINE RUN, 29 ALLEGHENY TOWNSHIP, BRIDGE REPLACEMENT 818,000 30 (BASE CONSTRUCTION ALLOCATION - 19970H0030B0757 - 317 -
1 $588,000) 2 (LAND ALLOCATION - $30,000) 3 (DESIGN AND CONTINGENCIES - $200,000) 4 (43) SR 4071, SR 4071 OVER BRANCH OF PINE 5 RUN, ALLEGHENY TOWNSHIP, BRIDGE 6 REPLACEMENT 305,000 7 (BASE CONSTRUCTION ALLOCATION - 8 $200,000) 9 (LAND ALLOCATION - $5,000) 10 (DESIGN AND CONTINGENCIES - $100,000) 11 (44) SR 4089, SR 4089 OVER BRANCH OF 12 CHARTIERS RUN, ALLEGHENY TOWNSHIP, 13 BRIDGE REPLACEMENT 348,000 14 (BASE CONSTRUCTION ALLOCATION - 15 $238,000) 16 (LAND ALLOCATION - $10,000) 17 (DESIGN AND CONTINGENCIES - $100,000) 18 (45) T-987, (FORMERLY SR 1071) OVER 19 HYPOCRITE CREEK, FAIRFIELD TOWNSHIP, 20 FOUR STATE BRIDGES, BRIDGE REPLACEMENT 800,000 21 (BASE CONSTRUCTION ALLOCATION - 22 $680,000) 23 (LAND ALLOCATION - $40,000) 24 (DESIGN AND CONTINGENCIES - $80,000) 25 (46) SR 0381, SR 0381 OVER LAUGHLINTOWN 26 RUN, LIGONIER TOWNSHIP, BRIDGE 27 REPLACEMENT 465,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $350,000) 30 (LAND ALLOCATION - $15,000) 19970H0030B0757 - 318 -
1 (DESIGN AND CONTINGENCIES - $100,000) 2 (47) SR 2043, SR 2043 OVER TWO MILE RUN, 3 LIGONIER TOWNSHIP, BRIDGE REPLACEMENT 465,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $350,000) 6 (LAND ALLOCATION - $15,000) 7 (DESIGN AND CONTINGENCIES - $100,000) 8 (48) SR 2045, SR 2045 OVER TWO MILE RUN, 9 LIGONIER TOWNSHIP, BRIDGE REPLACEMENT 465,000 10 (BASE CONSTRUCTION ALLOCATION - 11 $350,000) 12 (LAND ALLOCATION - $15,000) 13 (DESIGN AND CONTINGENCIES - $100,000) 14 (49) SR 2045, SR 2045 OVER LOYALHANNA 15 CREEK, LIGONIER TOWNSHIP, BRIDGE 16 REPLACEMENT 1,588,000 17 (BASE CONSTRUCTION ALLOCATION - 18 $1,313,000) 19 (LAND ALLOCATION - $75,000) 20 (DESIGN AND CONTINGENCIES - $200,000) 21 (50) SR 0119, BRIDGE NO.2 OVER CRABTREE 22 CREEK, HEMPFIELD TOWNSHIP, BRIDGE 23 REPLACEMENT 577,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $377,000) 26 (LAND ALLOCATION - $25,000) 27 (DESIGN AND CONTINGENCIES - $175,000) 28 (51) SR 8036, NEW STANTON RAMP BRIDGE OVER 29 SR 3091, TURNBACK PROJECT, NEW STANTON 30 BOROUGH, BRIDGE REHABILITATION 475,000 19970H0030B0757 - 319 -
1 (BASE CONSTRUCTION ALLOCATION - 2 $395,000) 3 (DESIGN AND CONTINGENCIES - $80,000) 4 SECTION 70. WYOMING COUNTY. 5 (A) LOCAL BRIDGES 6 (1) EXETER TOWNSHIP, T-336, BRIDGE NO.1, 2 7 MILES SOUTHWEST OF FALLS, BRIDGE 8 REPLACEMENT 280,000 9 (BASE CONSTRUCTION ALLOCATION - 10 $240,000) 11 (LAND ALLOCATION - $10,000) 12 (DESIGN AND CONTINGENCIES - $30,000) 13 (2) FALLS TOWNSHIP, T-336 OVER WHITE LOCK 14 STREAM, BRIDGE REPLACEMENT 280,000 15 (BASE CONSTRUCTION ALLOCATION - 16 $240,000) 17 (LAND ALLOCATION - $10,000) 18 (DESIGN AND CONTINGENCIES - $30,000) 19 (3) EXETER TOWNSHIP, T-336 OVER MILL 20 CREEK, BRIDGE REPLACEMENT 214,000 21 (BASE CONSTRUCTION ALLOCATION - 22 $166,000) 23 (LAND ALLOCATION - $20,000) 24 (DESIGN AND CONTINGENCIES - $28,000) 25 (B) STATE BRIDGES 26 (1) SR 3001, BRIDGE AT JUNCTION WITH SR 27 4004 OVER BRANCH OF SUSQUEHANNA RIVER, 28 WINDHAM TOWNSHIP, BRIDGE PAINTING 60,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $50,000) 19970H0030B0757 - 320 -
1 (DESIGN AND CONTINGENCIES - $10,000) 2 (2) STATE BRIDGES, COUNTYWIDE BRIDGE ZONE 3 PAINTING, BRIDGE PAINTING 370,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $350,000) 6 (LAND ALLOCATION - $10,000) 7 (DESIGN AND CONTINGENCIES - $10,000) 8 SECTION 71. YORK COUNTY. 9 (A) LOCAL BRIDGES 10 (1) CARROLL TOWNSHIP, GETTYSBURG ROAD 11 BRIDGE OVER YELLOW BREECHES CREEK, 12 BRIDGE REPLACEMENT 860,000 13 (BASE CONSTRUCTION ALLOCATION - 14 $700,000) 15 (LAND ALLOCATION - $10,000) 16 (DESIGN AND CONTINGENCIES - $150,000) 17 (2) CODORUS TOWNSHIP, SEITZVILLE ROAD OVER 18 SOUTH BRANCH OF CODORUS CREEK, BRIDGE 19 REPLACEMENT 300,000 20 (BASE CONSTRUCTION ALLOCATION - 21 $200,000) 22 (LAND ALLOCATION - $15,000) 23 (DESIGN AND CONTINGENCIES - $85,000) 24 (3) DOVER TOWNSHIP, CARDINAL LANE OVER FOX 25 RUN, BRIDGE REPLACEMENT 115,000 26 (BASE CONSTRUCTION ALLOCATION - 27 $70,000) 28 (LAND ALLOCATION - $15,000) 29 (DESIGN AND CONTINGENCIES - $30,000) 30 (4) DOVER TOWNSHIP, CONEWAGO ROAD OVER 19970H0030B0757 - 321 -
1 SALEM RUN, BRIDGE REPLACEMENT 300,000 2 (BASE CONSTRUCTION ALLOCATION - 3 $200,000) 4 (LAND ALLOCATION - $15,000) 5 (DESIGN AND CONTINGENCIES - $85,000) 6 (5) EAST HOPEWELL TOWNSHIP, SOUTH CHURCH 7 STREET EXTENDED, BRIDGE NO.1, BRIDGE 8 REHABILITATION 9,000 9 (BASE CONSTRUCTION ALLOCATION - $8,000) 10 (DESIGN AND CONTINGENCIES - $1,000) 11 (6) EAST HOPEWELL TOWNSHIP, SOUTH CHURCH 12 STREET EXTENDED, BRIDGE NO.2, OVER 13 RAMBO RUN, BRIDGE REHABILITATION 60,000 14 (BASE CONSTRUCTION ALLOCATION - 15 $50,000) 16 (DESIGN AND CONTINGENCIES - $10,000) 17 (7) EAST HOPEWELL TOWNSHIP, MANIFOLD 18 SCHOOL ROAD BRIDGE, BRIDGE 19 REHABILITATION 7,000 20 (BASE CONSTRUCTION ALLOCATION - $6,000) 21 (DESIGN AND CONTINGENCIES - $1,000) 22 (8) EAST HOPEWELL TOWNSHIP, TROUT SCHOOL 23 ROAD BRIDGE, BRIDGE REPLACEMENT 45,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $30,000) 26 (LAND ALLOCATION - $5,000) 27 (DESIGN AND CONTINGENCIES - $10,000) 28 (9) HELLAM TOWNSHIP, VALLEY ACRES ROAD 29 OVER TRIBUTARY OF KREUTZ CREEK, BRIDGE 30 REHABILITATION 40,000 19970H0030B0757 - 322 -
1 (BASE CONSTRUCTION ALLOCATION - 2 $35,000) 3 (DESIGN AND CONTINGENCIES - $5,000) 4 (10) HELLAM TOWNSHIP, LIBHART MILL ROAD 5 OVER TRIBUTARY OF KREUTZ CREEK, BRIDGE 6 REHABILITATION 40,000 7 (BASE CONSTRUCTION ALLOCATION - 8 $35,000) 9 (DESIGN AND CONTINGENCIES - $5,000) 10 (11) MANCHESTER TOWNSHIP, T-900, WOODLAND 11 VIEW DRIVE OVER CONRAIL, BRIDGE 12 REPLACEMENT 395,000 13 (BASE CONSTRUCTION ALLOCATION - 14 $275,000) 15 (LAND ALLOCATION - $30,000) 16 (DESIGN AND CONTINGENCIES - $90,000) 17 (12) MANCHESTER TOWNSHIP, T-940, BEAR ROAD 18 2,000 FEET NORTH OF SUSQUEHANNA TRAIL, 19 BRIDGE REPLACEMENT 40,000 20 (BASE CONSTRUCTION ALLOCATION - 21 $25,000) 22 (LAND ALLOCATION - $5,000) 23 (DESIGN AND CONTINGENCIES - $10,000) 24 (13) MANHEIM TOWNSHIP, T-320 OVER UNNAMED 25 TRIBUTARY OF GUNPOWDER FALLS CREEK, 26 BRIDGE REPLACEMENT 150,000 27 (BASE CONSTRUCTION ALLOCATION - 28 $100,000) 29 (LAND ALLOCATION - $10,000) 30 (DESIGN AND CONTINGENCIES - $40,000) 19970H0030B0757 - 323 -
1 (14) MANHEIM TOWNSHIP, T-346 OVER WEST 2 BRANCH OF CODORUS CREEK, BRIDGE 3 REPLACEMENT 250,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $190,000) 6 (LAND ALLOCATION - $10,000) 7 (DESIGN AND CONTINGENCIES - $50,000) 8 (15) MANHEIM TOWNSHIP, T-357 OVER UNNAMED 9 TRIBUTARY OF WEST BRANCH OF CODORUS 10 CREEK, BRIDGE REPLACEMENT 160,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $110,000) 13 (LAND ALLOCATION - $10,000) 14 (DESIGN AND CONTINGENCIES - $40,000) 15 (16) MANHEIM TOWNSHIP, T-370 OVER WEST 16 BRANCH OF CODORUS CREEK, BRIDGE 17 REPLACEMENT 200,000 18 (BASE CONSTRUCTION ALLOCATION - 19 $140,000) 20 (LAND ALLOCATION - $10,000) 21 (DESIGN AND CONTINGENCIES - $50,000) 22 (17) MANHEIM TOWNSHIP, T-413 OVER WEST 23 BRANCH OF CODORUS CREEK, BRIDGE 24 REPLACEMENT 150,000 25 (BASE CONSTRUCTION ALLOCATION - 26 $100,000) 27 (LAND ALLOCATION - $10,000) 28 (DESIGN AND CONTINGENCIES - $40,000) 29 (18) MANHEIM TOWNSHIP, TANNERY ROAD OVER 30 WEST BRANCH OF CODORUS CREEK, BRIDGE 19970H0030B0757 - 324 -
1 REPLACEMENT 250,000 2 (BASE CONSTRUCTION ALLOCATION - 3 $180,000) 4 (LAND ALLOCATION - $10,000) 5 (DESIGN AND CONTINGENCIES - $60,000) 6 (19) PARADISE TOWNSHIP, SHADY DELL ROAD, 7 BRIDGE REPLACEMENT 190,000 8 (BASE CONSTRUCTION ALLOCATION - 9 $110,000) 10 (LAND ALLOCATION - $10,000) 11 (DESIGN AND CONTINGENCIES - $70,000) 12 (20) PARADISE TOWNSHIP, BEAVER CREEK ROAD 13 OVER BEAVER CREEK, BRIDGE REPLACEMENT 275,000 14 (BASE CONSTRUCTION ALLOCATION - 15 $195,000) 16 (LAND ALLOCATION - $10,000) 17 (DESIGN AND CONTINGENCIES - $70,000) 18 (21) PENN TOWNSHIP, CENTER STREET OVER 19 TRIBUTARY OF OIL CREEK, BRIDGE 20 REPLACEMENT 183,000 21 (BASE CONSTRUCTION ALLOCATION - 22 $163,000) 23 (LAND ALLOCATION - $10,000) 24 (DESIGN AND CONTINGENCIES - $10,000) 25 (22) PENN TOWNSHIP, WESTMINSTER AVENUE 26 OVER PLUM CREEK, BRIDGE REPLACEMENT 230,000 27 (BASE CONSTRUCTION ALLOCATION - 28 $207,000) 29 (LAND ALLOCATION - $8,000) 30 (DESIGN AND CONTINGENCIES - $15,000) 19970H0030B0757 - 325 -
1 (23) PENN TOWNSHIP, PARK HEIGHTS OVER 2 TRIBUTARY OF PLUM CREEK, BRIDGE 3 REPLACEMENT 244,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $234,000) 6 (DESIGN AND CONTINGENCIES - $10,000) 7 (24) RED LION BOROUGH, NORTH CHARLES 8 STREET OVER FORMER MARYLAND AND 9 PENNSYLVANIA RAILROAD, BRIDGE 10 REPLACEMENT 395,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $275,000) 13 (LAND ALLOCATION - $30,000) 14 (DESIGN AND CONTINGENCIES - $90,000) 15 (25) SPRING GARDEN TOWNSHIP, TRI HILL ROAD 16 OVER TYLER RUN, BRIDGE REPLACEMENT 200,000 17 (BASE CONSTRUCTION ALLOCATION - 18 $120,000) 19 (LAND ALLOCATION - $20,000) 20 (DESIGN AND CONTINGENCIES - $60,000) 21 (26) WINDSOR BOROUGH, WEST GAY STREET OVER 22 FISHING CREEK, BRIDGE REPLACEMENT 200,000 23 (BASE CONSTRUCTION ALLOCATION - 24 $120,000) 25 (LAND ALLOCATION - $20,000) 26 (DESIGN AND CONTINGENCIES - $60,000) 27 (27) YORK TOWNSHIP, SCHOOL STREET OVER 28 BRANCH OF MILL CREEK, BRIDGE 29 REPLACEMENT 250,000 30 (BASE CONSTRUCTION ALLOCATION - 19970H0030B0757 - 326 -
1 $200,000) 2 (DESIGN AND CONTINGENCIES - $50,000) 3 (28) MANHEIM TOWNSHIP, SMOKETOWN ROAD 4 BRIDGE OVER CODORUS CREEK, BRIDGE 5 REPLACEMENT 240,000 6 (BASE CONSTRUCTION ALLOCATION - 7 $150,000) 8 (LAND ALLOCATION - $10,000) 9 (DESIGN AND CONTINGENCIES - $80,000) 10 (B) STATE BRIDGES 11 (1) SR 0194, BROADWAY STREET BRIDGE OVER 12 RED RUN, WASHINGTON TOWNSHIP, BRIDGE 13 REPLACEMENT 245,000 14 (BASE CONSTRUCTION ALLOCATION - 15 $150,000) 16 (LAND ALLOCATION - $10,000) 17 (DESIGN AND CONTINGENCIES - $85,000) 18 (2) SR 0234, EAST BERLIN ROAD BRIDGE OVER 19 PARADISE CREEK, JACKSON TOWNSHIP, 20 BRIDGE REPLACEMENT 325,000 21 (BASE CONSTRUCTION ALLOCATION - 22 $250,000) 23 (LAND ALLOCATION - $10,000) 24 (DESIGN AND CONTINGENCIES - $65,000) 25 (3) SR 3074, SMOKETOWN ROAD BRIDGE OVER 26 COD CREEK, MANHEIM TOWNSHIP, BRIDGE 27 REPLACEMENT 325,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $215,000) 30 (LAND ALLOCATION - $10,000) 19970H0030B0757 - 327 -
1 (DESIGN AND CONTINGENCIES - $100,000) 2 (4) SR 0116, YORK STREET OVER TRIBUTARY OF 3 OIL CREEK, PENN TOWNSHIP, BRIDGE 4 REPLACEMENT 275,000 5 (BASE CONSTRUCTION ALLOCATION - 6 $240,000) 7 (LAND ALLOCATION - $15,000) 8 (DESIGN AND CONTINGENCIES - $20,000) 9 (5) SR 0116, SR 0116 OVER CODORUS CREEK, 10 SPRING GROVE BOROUGH, BRIDGE 11 REPLACEMENT 300,000 12 (BASE CONSTRUCTION ALLOCATION - 13 $240,000) 14 (LAND ALLOCATION - $15,000) 15 (DESIGN AND CONTINGENCIES - $45,000) 16 (6) SR 0194, FREDERICK STREET OVER PLUM 17 CREEK, PENN TOWNSHIP, BRIDGE 18 REPLACEMENT 262,000 19 (BASE CONSTRUCTION ALLOCATION - 20 $234,000) 21 (LAND ALLOCATION - $8,000) 22 (DESIGN AND CONTINGENCIES - $20,000) 23 (7) SR 1012, EMIG ROAD OVER CONRAIL, 24 MANCHESTER TOWNSHIP, BRIDGE 25 REPLACEMENT 395,000 26 (BASE CONSTRUCTION ALLOCATION - 27 $275,000) 28 (LAND ALLOCATION - $30,000) 29 (DESIGN AND CONTINGENCIES - $90,000) 30 (8) SR 2031, PENN STREET OVER FISHING 19970H0030B0757 - 328 -
1 CREEK, WINDSOR BOROUGH, BRIDGE 2 REPLACEMENT 200,000 3 (BASE CONSTRUCTION ALLOCATION - 4 $120,000) 5 (LAND ALLOCATION - $20,000) 6 (DESIGN AND CONTINGENCIES - $60,000) 7 (9) SR 3001, SOUTH GEORGE STREET OVER 8 TYLER RUN, SPRING GARDEN TOWNSHIP, 9 BRIDGE REPLACEMENT 200,000 10 (BASE CONSTRUCTION ALLOCATION - 11 $120,000) 12 (LAND ALLOCATION - $20,000) 13 (DESIGN AND CONTINGENCIES - $60,000) 14 SECTION 71.1. STATEWIDE. 15 CONSTRUCTION OF ADVANCED WETLAND MITIGATION 16 PROJECTS NECESSARY TO REPLACE WETLANDS DISPLACED 17 BY BRIDGE PROJECTS AUTHORIZED UNDER THE ACT OF 18 DECEMBER 8, 1982 (P.L.848, NO.235), KNOWN AS THE 19 HIGHWAY-RAILROAD AND HIGHWAY BRIDGE CAPITAL BUDGET 20 ACT FOR 1982-1983 3,100,000 21 (BASE CONSTRUCTION ALLOCATION - 22 $2,500,000) 23 (LAND ALLOCATION - $350,000) 24 (DESIGN AND CONTINGENCIES - $250,000) 25 SECTION 71.2. STATE FORESTRY BRIDGE PROJECTS. 26 PROJECTS IN THE CATEGORY OF FORESTRY BRIDGE PROJECTS TO BE 27 CONSTRUCTED BY THE DEPARTMENT OF CONSERVATION AND NATURAL 28 RESOURCES, ITS SUCCESSORS OR ASSIGNS, AND TO BE FINANCED BY OIL 29 COMPANY FRANCHISE TAX REVENUES PURSUANT TO 75 PA.C.S. § 30 9502(A)(2)(IV) (RELATING TO IMPOSITION OF TAX), ARE HEREBY 19970H0030B0757 - 329 -
1 ITEMIZED, TOGETHER WITH THEIR RESPECTIVE ESTIMATED COSTS, AS 2 FOLLOWS: 3 (A) STATE FORESTRY BRIDGES 4 (1) ADAMS COUNTY 5 (A) REPLACEMENT OF BRIDGE NO.01-0005, 6 CARBAUGH RUN BRIDGE 250,000 7 (2) BEDFORD COUNTY 8 (A) REPLACEMENT OF BRIDGE NO.02-0002, 9 WERTZ ROAD BRIDGE OVER COVE CREEK 100,000 10 (3) CENTRE COUNTY 11 (A) REPLACEMENT OF BRIDGE NO.7-0010, 12 SIGLERVILLE MILLHEIM PIKE BRIDGE 162,000 13 (B) REPLACEMENT OF BRIDGE NO.7-0015, 14 GREEN VALLEY ROAD BRIDGE 260,000 15 (C) REPLACEMENT OF BRIDGE NO.7-0033, 16 PINE CREEK ROAD BRIDGE 386,000 17 (D) REPLACEMENT OF BRIDGE NO.7-0045, 18 MCCALL DAM ROAD BRIDGE OVER WHITE 19 DEER CREEK 180,000 20 (E) REPLACEMENT OF BRIDGE NO.9-0030, 21 SIX MILE RUN BRIDGE 192,000 22 (F) REPLACEMENT OF BRIDGE NO.10-0028, 23 STATE LINE ROAD BRIDGE 196,000 24 (4) CLEARFIELD COUNTY 25 (A) REPLACEMENT OF BRIDGE NO.9-0005, 26 TYLER ROAD BRIDGE OVER LAUREL RUN 284,000 27 (B) REPLACEMENT OF BRIDGE NO.9-0019, 28 DENT'S BRANCH ROAD BRIDGE 282,000 29 (C) REPLACEMENT OF BRIDGE NO.9-0022, 30 MERRILL ROAD BRIDGE 197,000 19970H0030B0757 - 330 -
1 (5) CLINTON COUNTY 2 (A) REPLACEMENT OF BRIDGE NO.10-0033, 3 COOKS RUN ROAD BRIDGE OVER COOKS 4 RUN 110,000 5 (B) REPLACEMENT OF BRIDGE NO.10-0042, 6 TWO MILE ROAD BRIDGE 100,000 7 (C) REPLACEMENT OF BRIDGE NO.10-0043, 8 BIG BASIN ROAD BRIDGE OVER SHINTOWN 9 RUN 206,000 10 (D) REPLACEMENT OF BRIDGE NO.10-059, 11 BRIDGE OVER RIGHT BRANCH OF YOUNG 12 WOMAN'S CREEK ROAD 287,000 13 (E) REPLACEMENT OF BRIDGE NO.10-0064, 14 TROUT RUN BRIDGE 255,000 15 (F) REPLACEMENT OF BRIDGE NO.15-0021, 16 COUNTY LINE ROAD BRIDGE 167,000 17 (6) CUMBERLAND COUNTY 18 (A) REPLACEMENT OF BRIDGE NO.01-0006, 19 WOODROW ROAD RUN BRIDGE 150,000 20 (B) REPLACEMENT OF BRIDGE NO.01-0010, 21 MILESBURN ROAD BRIDGE 102,000 22 (7) DAUPHIN COUNTY 23 (A) REPLACEMENT OF LARGE CULVERT, 24 WHITE OAK ROAD BRIDGE OVER WHITE 25 OAK RUN 100,000 26 (8) ELK COUNTY 27 (A) REPLACEMENT OF BRIDGE NO.13-0040, 28 RED RUN ROAD BRIDGE 160,000 29 (B) REPLACEMENT OF BRIDGE NO.13-0049, 30 SHAFFER DRAFT ROAD BRIDGE 175,000 19970H0030B0757 - 331 -
1 (C) REPLACEMENT OF BRIDGE NO.13-0050, 2 WEST HICKS RUN ROAD BRIDGE 175,000 3 (D) REPLACEMENT OF BRIDGE NO.13-0052, 4 BRIDGE OVER EAST BRANCH OF HICKS 5 RUN 175,000 6 (E) REPLACEMENT OF BRIDGE NO.13-0053, 7 BRIDGE OVER EAST BRANCH OF HICKS 8 RUN 175,000 9 (9) FRANKLIN COUNTY 10 (A) REPLACEMENT OF BRIDGE NO.01-0016, 11 WIRT ROAD BRIDGE 147,000 12 (B) REPLACEMENT OF BRIDGE NO.01-0022, 13 RATTLESNAKE RUN ROAD BRIDGE 149,000 14 (C) REPLACEMENT OF BRIDGE NO.01-0021, 15 LINDSAY LOT ROAD BRIDGE OVER 16 FURNACE RUN 100,000 17 (10) HUNTINGDON COUNTY 18 (A) REPLACEMENT OF BRIDGE NO.5-0012, 19 COLERAIN ROAD BRIDGE 235,000 20 (B) REPLACEMENT OF BRIDGE NO.5-0014, 21 COOPERS GAP ROAD BRIDGE 160,000 22 (C) REPLACEMENT OF BRIDGE NO.5-0021, 23 STONE CREEK ROAD BRIDGE 182,000 24 (D) REPLACEMENT OF BRIDGE NO.5-0027, 25 DIAMOND VALLEY ROAD BRIDGE OVER 26 GLOBE RUN 100,000 27 (E) REPLACEMENT OF BRIDGE NO.5-0028, 28 LAUREL RUN ROAD BRIDGE 213,000 29 (F) REPLACEMENT OF BRIDGE NO.5-0051, 30 COOPERS GAP ROAD BRIDGE 174,000 19970H0030B0757 - 332 -
1 (11) JEFFERSON COUNTY 2 (A) REPLACEMENT OF BRIDGE NO.8-0003, 3 CALLEN RUN ROAD BRIDGE OVER CALLEN 4 RUN 200,000 5 (12) JUNIATA COUNTY 6 (A) REPLACEMENT OF BRIDGE NO.3-0007, 7 SPECTACLE GAP BRIDGE 158,000 8 (13) LYCOMING COUNTY 9 (A) REPLACEMENT OF BRIDGE NO.12-0015, 10 ROCK RUN ROAD BRIDGE 175,000 11 (B) REPLACEMENT OF BRIDGE NO.12-0016, 12 ROCK RUN ROAD BRIDGE 164,000 13 (C) REPLACEMENT OF BRIDGE NO.12-0019, 14 LITTLE BEAR BRIDGE 193,000 15 (D) REPLACEMENT OF BRIDGE NO.12-0020, 16 LITTLE BEAR BRIDGE 193,000 17 (E) REPLACEMENT OF BRIDGE NO.12-0021, 18 LITTLE BEAR BRIDGE 193,000 19 (F) REPLACEMENT OF BRIDGE NO.12-0022, 20 LITTLE BEAR CREEK ROAD BRIDGE 237,000 21 (G) REPLACEMENT OF BRIDGE NO.12-0028, 22 FOURTH GAP ROAD BRIDGE 100,000 23 (H) REPLACEMENT OF LARGE CULVERT, 24 FRANCES ROAD AT BIG HOLLOW 100,000 25 (14) MIFFLIN COUNTY 26 (A) REPLACEMENT OF BRIDGE NO.3-0008, 27 SPECTACLE GAP ROAD BRIDGE OVER EAST 28 LICKING CREEK 150,000 29 (B) REPLACEMENT OF BRIDGE NO.7-0004, 30 HAVICE VALLEY ROAD BRIDGE OVER 19970H0030B0757 - 333 -
1 PANTHER RUN 257,000 2 (15) MONROE COUNTY 3 (A) REPLACEMENT OF BRIDGE NO.19-0001, 4 LAUREL RUN ROAD BRIDGE 159,000 5 (16) PERRY COUNTY 6 (A) REPLACEMENT OF BRIDGE NO.3-0010, 7 ELK HILL ROAD BRIDGE 152,000 8 (B) REPLACEMENT OF BRIDGE NO.3-0011, 9 ELK HILL ROAD BRIDGE 152,000 10 (C) REPLACEMENT OF BRIDGE NO.3-0014, 11 PHOENIX BRIDGE, ROAD WASHOUT AT 12 NORTH ABUTMENT 100,000 13 (D) REPLACEMENT OF BRIDGE NO.3-0015, 14 SHEAFFER RUN BRIDGE, UNDERMINING AT 15 SOUTH ABUTMENT 150,000 16 (E) REPLACEMENT OF BRIDGE NO.3-0016, 17 LAUREL RUN ROAD BRIDGE 185,000 18 (F) REPLACEMENT OF BRIDGE NO.3-0018, 19 TWIN BRIDGE 180,000 20 (G) REPLACEMENT OF CULVERT, SHEARER 21 DUG BOX CULVERT 100,000 22 (17) PIKE COUNTY 23 (A) REPLACEMENT OF BRIDGE NO.19-0004, 24 PINE FLATS RUN ROAD BRIDGE 160,000 25 (18) POTTER COUNTY 26 (A) REPLACEMENT OF BRIDGE NO.15-0013, 27 WINDFALL ROAD BRIDGE 160,000 28 (B) REPLACEMENT OF BRIDGE NO.15-0015, 29 JOERG RUN ROAD BRIDGE 160,000 30 (C) REPLACEMENT OF BRIDGE NO.15-0018, 19970H0030B0757 - 334 -
1 LEBO RUN ROAD BRIDGE 160,000 2 (D) REPLACEMENT OF BRIDGE NO.15-0020, 3 ROBINSON ROAD BRIDGE 230,000 4 (E) REPLACEMENT OF BRIDGE NO.15-0024, 5 ROBINSON ROAD BRIDGE 140,000 6 (F) REPLACEMENT OF BRIDGE NO.16-0015, 7 BUTTERNUT HOLLOW ROAD BRIDGE OVER 8 KETTLE CREEK 110,000 9 (19) SOMERSET COUNTY 10 (A) REPLACEMENT OF BRIDGE NO.4-0002, 11 BLUE HOLE ROAD BRIDGE 192,000 12 (B) REPLACEMENT OF BRIDGE NO.4-0008, 13 COLE RUN ROAD BRIDGE 138,000 14 (20) SULLIVAN COUNTY 15 (A) REPLACEMENT OF BRIDGE NO.20-0002, 16 BRUNNERDALE ROAD BRIDGE 220,000 17 (B) REPLACEMENT OF BRIDGE NO.20-0008, 18 SHANERBURG ROAD BRIDGE 212,000 19 (C) REPLACEMENT OF BRIDGE NO.20-0011, 20 SHANERBURG ROAD BRIDGE OVER 21 SHANERBURG RUN 110,000 22 (21) TIOGA COUNTY 23 (A) REPLACEMENT OF BRIDGE NO.16-0004, 24 LEFT ASAPH ROAD BRIDGE 248,000 25 (B) REPLACEMENT OF BRIDGE NO.16-0005, 26 ASAPH RUN BRIDGE 414,000 27 (C) REPLACEMENT OF BRIDGE NO.16-0010, 28 PAINTER LEETONIA ROAD BRIDGE 170,000 29 (D) REPLACEMENT OF BRIDGE NO.16-0011, 30 CEDAR RUN BRIDGE 170,000 19970H0030B0757 - 335 -
1 (E) REPLACEMENT OF BRIDGE NO.16-0020, 2 MINE HOLE ROAD BRIDGE 107,000 3 (22) WESTMORELAND COUNTY 4 (A) REPLACEMENT OF BRIDGE NO.4-0011, 5 LINN RUN ROAD BRIDGE OVER LINN RUN 125,000 6 (23) UNION COUNTY 7 (A) REPLACEMENT OF BRIDGE NO.7-0016, 8 HOOFNAGLE ROAD BRIDGE 235,000 9 (B) REPLACEMENT OF BRIDGE NO.7-0017, 10 WEIKERT RUN ROAD BRIDGE 235,000 11 (C) REPLACEMENT OF BRIDGE NO.7-0047, 12 WHITE DEER CREEK ROAD BRIDGE 234,000 13 SECTION 71.3. STATEWIDE BICYCLE AND PEDESTRIAN 14 STRUCTURES. 15 REHABILITATION, CONSTRUCTION AND DEMOLITION OF 16 BRIDGES AND OTHER CROSSING STRUCTURES ON BICYCLE 17 AND PEDESTRIAN WAYS TO BE IDENTIFIED BY THE 18 DEPARTMENT OF CONSERVATION AND NATURAL RESOURCES 5,000,000 19 Section 72. Limitation on expenditure of funds. 20 Any moneys derived from the incurring of debt shall be used 21 solely for effecting the rehabilitation, replacement or removal 22 of bridges located on State highways. All other bridge 23 rehabilitation, replacement or removal shall be financed and 24 State bridge rehabilitation, replacement or removal may also be 25 financed from current revenue. 26 Section 73. Debt authorization. 27 The Governor, Auditor General and State Treasurer are hereby 28 authorized and directed to borrow from time to time, in addition 29 to any authorization heretofore or hereafter enacted, on the 30 credit of the Commonwealth, subject to the limitations provided 19970H0030B0757 - 336 -
1 in the current capital budget, money not exceeding in the 2 aggregate the sum of $3,598,000 $890,520,000 as may be found <-- 3 necessary to carry out the acquisition and construction of the 4 State highway BRIDGE projects specifically itemized in this act. <-- 5 Section 74. Issue of bonds. 6 The indebtedness authorized in this act shall be incurred 7 from time to time and shall be evidenced by one or more series 8 of general obligation bonds of the Commonwealth in such 9 aggregate principal amount for each series as the Governor, 10 Auditor General and State Treasurer shall determine, but the 11 latest stated maturity date shall not exceed 30 years from the 12 date of the bond first issued for each series. 13 Section 75. Estimated useful life of projects. 14 The General Assembly states the estimated useful life of the 15 projects itemized in this act as 30 years. 16 Section 76. Appropriation. 17 The net proceeds of the sale of the obligations authorized in 18 this act are hereby appropriated from the Capital Facilities 19 Fund to the department in the maximum amount of $3,598,000 <-- 20 $890,520,000 to be used by it exclusively to defray the 21 financial costs of the State projects specifically itemized in 22 this capital budget. After reserving or paying the expenses of 23 the sale of the obligation, the State Treasurer shall pay out to 24 the department AND THE DEPARTMENT OF CONSERVATION AND NATURAL <-- 25 RESOURCES the moneys as required and certified by it to be 26 legally due and payable. 27 Section 77. Federal funds. 28 In addition to those funds appropriated in section 76, all 29 moneys received from the Federal Government for the public 30 improvement projects specifically itemized in this act are also 19970H0030B0757 - 337 -
1 hereby appropriated for those projects. 2 Section 78. Allocation of funds. 3 (a) General rule.--Whenever the department determines that 4 the full estimated financial costs of the projects itemized in 5 this act are not necessary for the proper design, acquisition or 6 construction of such projects, the excess funds no longer 7 required may be allocated by the department to increase the 8 estimated costs of any one or more of the projects specifically 9 itemized in a capital budget. 10 (b) Reimbursement of municipal expenditures.--Moneys raised 11 or expended by municipalities after the effective date of this 12 act, in anticipation of receipt of funds authorized for projects 13 itemized by this act, may be reimbursable to those 14 municipalities. 15 Section 79. Policy on jobs and materials. 16 (a) Jobs.--It is the declared policy of the Commonwealth 17 that the construction projects authorized in this act be used, 18 to the greatest extent possible, to provide for the creation of 19 jobs and the rehiring of the unemployed in this Commonwealth. In 20 order to reach this goal, firms with Commonwealth-based 21 facilities shall be actively solicited to make bids on contracts 22 to furnish products and materials, including, but not limited 23 to, steel and steel products, to be used in these projects. 24 (b) Materials.--Every contract document entered into to 25 undertake a project contained in this act shall provide that any 26 steel or other products to be used or supplied in the 27 performance of this contract shall be required to be 28 manufactured by plants in the United States unless the secretary 29 determines, on a contract by contract basis, that certain 30 required products are not produced in the United States in 19970H0030B0757 - 338 -
1 sufficient quantities to meet the requirements of the contract. 2 Such a determination and the reasons therefor shall be published 3 in the Pennsylvania Bulletin. Decisions made under this 4 subsection shall not be inconsistent with the general provisions 5 of the act of March 3, 1978 (P.L.6, No.3), known as the Steel 6 Products Procurement Act. 7 (c) Minorities and women.--It is also the declared policy of 8 the Commonwealth to require and encourage substantial 9 participation by minorities and women in the construction 10 projects authorized by this act. 11 Section 80. Cost sharing for relocation of utility facilities. 12 (a) General rule.--Whenever the repair, rehabilitation or 13 replacement of a highway bridge itemized in this act is 14 sponsored by a local governmental entity and requires the 15 adjustment of utility facilities owned and operated by a 16 municipality or municipal authority that will be incorporated 17 into the project contract, the local government sponsor may, if 18 permitted by enabling legislation, share in the costs of the 19 alteration of the municipality or municipal authority facilities 20 located within the public right-of-way. The local government 21 sponsor's share shall not exceed 50% of the cost of the 22 alteration. The portion of the cost shared by the sponsor of the 23 alteration may be submitted for reimbursement under this act. 24 (b) Review by department.--The department has the right to 25 review all local government sponsor-approved cost-sharing 26 requests made by a municipality or municipal authority and may, 27 in its discretion, request the local government sponsor to 28 justify and submit documents supporting the request for cost 29 sharing. The department may reject the cost-sharing request as 30 submitted by the local government sponsor. In the event the 19970H0030B0757 - 339 -
1 cost-sharing request is rejected by the department, the local 2 government sponsor may still share in the cost if otherwise 3 permitted to do so by law. Costs not approved under this 4 subsection shall not be eligible for reimbursement under this 5 act. If the cost-sharing request is approved, the local 6 government sponsor shall submit proof to the department of its 7 reimbursement to the municipality or municipal authority. 8 Section 81. Payment of capital debt service. 9 The repayment of any debt incurred pursuant to this act shall 10 be made from the account and such repayment shall have first 11 claim on the revenues of the account. 12 Section 82. Authorization and debt cumulation. 13 The additional authorization and debt allowance provided for 14 in this act shall be added to the total authorizations and debt 15 incurred pursuant to the act of December 8, 1982 (P.L.848, 16 No.235), known as the Highway-Railroad and Highway Bridge 17 Capital Budget Act for 1982-1983, as amended and supplemented. 18 Section 83. Effective date. 19 This act shall take effect immediately. A10L863RZ/19970H0030B0757 - 340 -