SENATE AMENDED PRIOR PRINTER'S NO. 1131 PRINTER'S NO. 3629
No. 1023 Session of 1999
INTRODUCED BY BARLEY, MARCH 22, 1999
SENATOR TILGHMAN, APPROPRIATIONS, IN SENATE, RE-REPORTED AS AMENDED, JUNE 5, 2000
AN ACT 1 Providing for the capital budget for the fiscal year 1999-2000. <-- 2 AMENDING THE ACT OF MAY 22, 2000 (P.L.104, NO.22), ENTITLED "AN <-- 3 ACT PROVIDING FOR THE CAPITAL BUDGET FOR THE FISCAL YEAR 4 2000-2001," INCREASING THE CAPITAL BUDGET DEBT AUTHORIZATIONS 5 AND PROVIDING FOR THE ITEMIZATION OF PUBLIC IMPROVEMENT 6 PROJECTS, FURNITURE AND EQUIPMENT PROJECTS, TRANSPORTATION 7 ASSISTANCE PROJECTS, REDEVELOPMENT ASSISTANCE PROJECTS, FLOOD 8 CONTROL PROJECTS, KEYSTONE RECREATION, PARK AND CONSERVATION 9 PROJECTS, ENVIRONMENTAL STEWARDSHIP FUND PROJECTS AND PUBLIC 10 HIGHWAY PROJECTS; AUTHORIZING THE INCURRING OF DEBT WITHOUT 11 THE APPROVAL OF THE ELECTORS FOR THE PURPOSE OF FINANCING THE 12 PROJECTS; STATING THE ESTIMATED USEFUL LIFE OF THE PROJECTS; 13 MAKING APPROPRIATIONS; AND MAKING REPEALS. 14 The General Assembly of the Commonwealth of Pennsylvania 15 hereby enacts as follows: 16 Section 1. Short title and construction. <-- 17 (a) Short title.--This act shall be known and may be cited 18 as the Capital Budget Act of 1999-2000. 19 (b) Supplements.--A reference to this act shall be deemed to 20 include a reference to the supplements to this act. 21 (c) Capital Facilities Debt Enabling Act.--The provisions 22 and definitions of Chapter 3 of the act of February 9, 1999
1 (P.L.1, No.1), known as The Capital Facilities Debt Enabling 2 Act, shall apply to this act to the extent they are not 3 inconsistent with this act. 4 Section 2. Overall limitations on debt to be incurred for 5 capital projects. 6 The maximum principal amount of additional debt to be 7 incurred during the 1999-2000 fiscal year, and thereafter until 8 the enactment of the 2000-2001 capital budget specifying the 9 maximum debt for the 2000-2001 fiscal year, for capital projects 10 specifically itemized in a capital budget pursuant to section 11 7(a)(4) of Article VIII of the Constitution of Pennsylvania, and 12 the fund to be charged with the repayment of such debt, shall, 13 with respect to each category of capital projects, be as 14 follows: 15 Category Amount Fund 16 (1) Public Improvement 17 Projects: 18 (i) Buildings and General Fund or 19 Structures $410,000,000 Special Fund as 20 (ii) Furniture and applicable 21 Equipment 70,000,000 22 (2) Transportation 23 Assistance Projects 150,000,000 General Fund 24 (3) Redevelopment 25 Assistance Projects 280,000,000 General Fund 26 (4) Flood Control 27 Projects 12,000,000 General Fund 28 Total $922,000,000 29 Section 3. Effective date. 30 This act shall take effect July 1, 1999, or immediately, 19990H1023B3629 - 2 -
1 whichever is later. 2 SECTION 1. THE TITLE AND SECTIONS 1 AND 2 OF THE ACT OF MAY <-- 3 22, 2000 (P.L.104, NO.22), KNOWN AS THE CAPITAL BUDGET ACT OF 4 2000-2001, ARE AMENDED TO READ: 5 AN ACT 6 PROVIDING FOR THE CAPITAL BUDGET FOR THE FISCAL YEAR 2000- 7 2001[.], ITEMIZING PUBLIC IMPROVEMENT PROJECTS, FURNITURE AND 8 EQUIPMENT PROJECTS, TRANSPORTATION ASSISTANCE PROJECTS, 9 REDEVELOPMENT ASSISTANCE PROJECTS, FLOOD CONTROL PROJECTS, 10 KEYSTONE RECREATION, PARK AND CONSERVATION PROJECTS, 11 ENVIRONMENTAL STEWARDSHIP FUND PROJECTS AND PUBLIC HIGHWAY 12 PROJECTS TO BE CONSTRUCTED OR ACQUIRED OR ASSISTED BY THE 13 DEPARTMENT OF GENERAL SERVICES, THE DEPARTMENT OF COMMUNITY 14 AND ECONOMIC DEVELOPMENT, THE DEPARTMENT OF CONSERVATION AND 15 NATURAL RESOURCES, THE DEPARTMENT OF ENVIRONMENTAL 16 PROTECTION, THE PENNSYLVANIA FISH AND BOAT COMMISSION, THE 17 PENNSYLVANIA GAME COMMISSION, AND THE DEPARTMENT OF 18 TRANSPORTATION, TOGETHER WITH THEIR ESTIMATED FINANCIAL 19 COSTS; AUTHORIZING THE INCURRING OF DEBT WITHOUT THE APPROVAL 20 OF THE ELECTORS FOR THE PURPOSE OF FINANCING THE PROJECTS TO 21 BE CONSTRUCTED OR ACQUIRED OR ASSISTED BY THE DEPARTMENT OF 22 GENERAL SERVICES, THE DEPARTMENT OF COMMUNITY AND ECONOMIC 23 DEVELOPMENT, THE DEPARTMENT OF CONSERVATION AND NATURAL 24 RESOURCES, THE DEPARTMENT OF ENVIRONMENTAL PROTECTION OR THE 25 DEPARTMENT OF TRANSPORTATION; STATING THE ESTIMATED USEFUL 26 LIFE OF THE PROJECTS; MAKING APPROPRIATIONS; AND MAKING 27 REPEALS. 28 SECTION 1. SHORT TITLE AND CONSTRUCTION. 29 (A) SHORT TITLE.--THIS ACT SHALL BE KNOWN AND MAY BE CITED 30 AS THE CAPITAL BUDGET DEBT AUTHORIZATION AND PROJECT ITEMIZATION 19990H1023B3629 - 3 -
1 ACT OF 2000-2001. 2 (B) SUPPLEMENTS.--A REFERENCE TO THIS ACT SHALL BE DEEMED TO 3 INCLUDE A REFERENCE TO THE SUPPLEMENTS TO THIS ACT. 4 (C) CAPITAL FACILITIES DEBT ENABLING ACT.--THE PROVISIONS 5 AND DEFINITIONS OF CHAPTER 3 OF THE ACT OF FEBRUARY 9, 1999 6 (P.L.1, NO.1), KNOWN AS THE CAPITAL FACILITIES DEBT ENABLING 7 ACT, SHALL APPLY TO THIS ACT TO THE EXTENT THEY ARE NOT 8 INCONSISTENT WITH THIS ACT. 9 SECTION 2. OVERALL LIMITATIONS ON DEBT TO BE INCURRED FOR 10 CAPITAL PROJECTS. 11 THE MAXIMUM PRINCIPAL AMOUNT OF ADDITIONAL DEBT TO BE 12 INCURRED DURING THE 2000-2001 FISCAL YEAR, AND THEREAFTER UNTIL 13 THE ENACTMENT OF THE 2001-2002 CAPITAL BUDGET SPECIFYING THE 14 MAXIMUM DEBT FOR THE 2001-2002 FISCAL YEAR, FOR CAPITAL PROJECTS 15 SPECIFICALLY ITEMIZED IN A CAPITAL BUDGET PURSUANT TO SECTION 16 7(A)(4) OF ARTICLE VIII OF THE CONSTITUTION OF PENNSYLVANIA, AND 17 THE FUND TO BE CHARGED WITH THE REPAYMENT OF SUCH DEBT, SHALL, 18 WITH RESPECT TO EACH CATEGORY OF CAPITAL PROJECTS, BE AS 19 FOLLOWS: 20 CATEGORY AMOUNT FUND 21 (1) PUBLIC IMPROVEMENT 22 PROJECTS: 23 (I) BUILDINGS AND GENERAL FUND OR 24 [STRUCTURES $450,000,000 SPECIAL FUND AS 25 (II) FURNITURE AND APPLICABLE 26 EQUIPMENT 70,000,000 27 (2) TRANSPORTATION 28 ASSISTANCE PROJECTS 172,000,000 GENERAL FUND 29 (3) REDEVELOPMENT 30 ASSISTANCE PROJECTS 280,000,000 GENERAL FUND 19990H1023B3629 - 4 -
1 (4) FLOOD CONTROL 2 PROJECTS 7,000,000 GENERAL FUND 3 TOTAL $979,000,000] 4 STRUCTURES $600,000,000 SPECIAL FUND AS 5 (II) FURNITURE AND APPLICABLE 6 EQUIPMENT 80,000,000 7 (2) TRANSPORTATION 8 ASSISTANCE PROJECTS 190,000,000 GENERAL FUND 9 (3) REDEVELOPMENT 10 ASSISTANCE PROJECTS 295,000,000 GENERAL FUND 11 (4) FLOOD CONTROL 12 PROJECTS 14,000,000 GENERAL FUND 13 TOTAL $1,179,000,000 14 SECTION 2. THE ACT IS AMENDED BY ADDING SECTIONS TO READ: 15 SECTION 3. TOTAL AUTHORIZATIONS. 16 (A) PUBLIC IMPROVEMENTS.--THE TOTAL AUTHORIZATION FOR THE 17 ADDITIONAL CAPITAL PROJECTS IN THE CATEGORY OF PUBLIC 18 IMPROVEMENT PROJECTS ITEMIZED IN SECTION 4 AND TO BE ACQUIRED OR 19 CONSTRUCTED BY THE DEPARTMENT OF GENERAL SERVICES, ITS 20 SUCCESSORS OR ASSIGNS, AND TO BE FINANCED BY THE INCURRING OF 21 DEBT, SHALL BE $557,240,000. 22 (B) FURNITURE AND EQUIPMENT.--THE TOTAL AUTHORIZATION FOR 23 THE ADDITIONAL CAPITAL PROJECTS IN THE CATEGORY OF PUBLIC 24 IMPROVEMENT PROJECTS CONSISTING OF THE ACQUISITION OF ORIGINAL 25 MOVABLE FURNITURE AND EQUIPMENT TO COMPLETE PUBLIC IMPROVEMENT 26 PROJECTS ITEMIZED IN SECTION 5 AND TO BE ACQUIRED BY THE 27 DEPARTMENT OF GENERAL SERVICES, ITS SUCCESSORS OR ASSIGNS, AND 28 TO BE FINANCED BY THE INCURRING OF DEBT, SHALL BE $16,194,000. 29 (C) TRANSPORTATION ASSISTANCE.--THE TOTAL AUTHORIZATION FOR 30 THE CAPITAL PROJECTS IN THE CATEGORY OF TRANSPORTATION 19990H1023B3629 - 5 -
1 ASSISTANCE PROJECTS ITEMIZED IN SECTION 6 WITH RESPECT TO WHICH 2 AN INTEREST IS TO BE ACQUIRED IN OR CONSTRUCTED BY THE 3 DEPARTMENT OF TRANSPORTATION, ITS SUCCESSORS OR ASSIGNS, AND TO 4 BE FINANCED BY THE INCURRING OF DEBT, SHALL BE $561,168,000. 5 (D) REDEVELOPMENT ASSISTANCE.--THE TOTAL AUTHORIZATION FOR 6 THE ADDITIONAL CAPITAL PROJECTS IN THE CATEGORY OF REDEVELOPMENT 7 ASSISTANCE AND REDEVELOPMENT ASSISTANCE CAPITAL PROJECTS 8 ITEMIZED IN SECTION 7 FOR CAPITAL GRANTS BY THE DEPARTMENT OF 9 COMMUNITY AND ECONOMIC DEVELOPMENT, ITS SUCCESSORS OR ASSIGNS, 10 AND TO BE FINANCED BY THE INCURRING OF DEBT, SHALL BE 11 $540,413,000. 12 (E) FLOOD CONTROL.--THE TOTAL AUTHORIZATION FOR THE CAPITAL 13 PROJECTS IN THE CATEGORY OF FLOOD CONTROL PROJECTS ITEMIZED IN 14 SECTION 8 AND TO BE CONSTRUCTED BY THE DEPARTMENT OF 15 ENVIRONMENTAL PROTECTION, ITS SUCCESSORS OR ASSIGNS, AND TO BE 16 FINANCED BY THE INCURRING OF DEBT, SHALL BE $7,859,000. 17 (F) KEYSTONE RECREATION, PARK AND CONSERVATION.--THE TOTAL 18 AUTHORIZATION FOR THE CAPITAL PROJECTS IN THE CATEGORY OF 19 KEYSTONE RECREATION, PARK AND CONSERVATION PROJECTS ITEMIZED IN 20 SECTION 9 AND TO BE CONSTRUCTED BY THE DEPARTMENT OF 21 CONSERVATION AND NATURAL RESOURCES, ITS SUCCESSORS OR ASSIGNS, 22 AND TO BE FINANCED FROM REVENUES IN THE KEYSTONE RECREATION, 23 PARK AND CONSERVATION FUND SHALL BE $22,820,000. 24 (G) ENVIRONMENTAL STEWARDSHIP FUND PROJECTS.--THE TOTAL 25 AUTHORIZATION FOR THE CAPITAL PROJECTS THE CATEGORY OF 26 ENVIRONMENTAL STEWARDSHIP PROJECTS ITEMIZED IN SECTION 10 AND TO 27 BE CONSTRUCTED BY THE DEPARTMENT OF CONSERVATION AND NATURAL 28 RESOURCES, ITS SUCCESSORS OR ASSIGNS, AND TO BE FINANCED FROM 29 REVENUES IN THE ENVIRONMENTAL STEWARDSHIP FUND SHALL BE 30 $64,185,000. 19990H1023B3629 - 6 -
1 (H) PUBLIC HIGHWAY PROJECTS.--THE TOTAL AUTHORIZATION FOR 2 THE CAPITAL PROJECTS IN THE CATEGORY OF HIGHWAY PROJECTS 3 ITEMIZED IN SECTION 11 AND TO BE CONSTRUCTED BY THE DEPARTMENT 4 OF TRANSPORTATION, ITS SUCCESSORS OR ASSIGNS, AND TO BE FINANCED 5 BY THE INCURRING OF DEBT, OR FROM CURRENT REVENUES OF THE MOTOR 6 LICENSE FUND, SHALL BE $2,416,468,000. 7 (I) FISH AND BOAT FUND PROJECTS.--THE TOTAL AUTHORIZATION 8 FOR THE CAPITAL PROJECTS IN THE CATEGORY OF PUBLIC IMPROVEMENT 9 PROJECTS ITEMIZED IN SECTION 12 TO BE ACQUIRED OR DEVELOPED BY 10 THE PENNSYLVANIA FISH AND BOAT COMMISSION AND TO BE FINANCED 11 FROM CURRENT REVENUES OF THE BOAT FUND AND THE FISH FUND 12 PURSUANT TO EXECUTIVE AUTHORIZATION SHALL BE $1,200,000. 13 (J) GAME FUND PROJECTS.--THE TOTAL AUTHORIZATION FOR THE 14 CAPITAL PROJECTS IN THE CATEGORY OF PUBLIC IMPROVEMENT PROJECTS 15 ITEMIZED IN SECTION 13 TO BE ACQUIRED BY THE PENNSYLVANIA GAME 16 COMMISSION, AND TO BE FINANCED FROM CURRENT REVENUES OF THE GAME 17 FUND PURSUANT TO EXECUTIVE AUTHORIZATIONS, SHALL BE $570,000. 18 (K) GENERAL FUND CURRENT REVENUE PROJECTS.--THE TOTAL 19 AUTHORIZATION FOR THE CAPITAL PROJECTS IN THE CATEGORY OF PUBLIC 20 IMPROVEMENT PROJECTS ITEMIZED IN SECTION 14 AND TO BE 21 CONSTRUCTED BY THE DEPARTMENT OF GENERAL SERVICES, ITS 22 SUCCESSORS OR ASSIGNS, AND TO BE FINANCED FROM CURRENT REVENUES 23 IN THE GENERAL FUND SHALL BE $14,410,000. 24 (L) MOTOR LICENSE FUND CURRENT REVENUE PROJECTS.--THE TOTAL 25 AUTHORIZATION FOR THE CAPITAL PROJECTS IN THE CATEGORY OF PUBLIC 26 IMPROVEMENT PROJECTS ITEMIZED IN SECTION 15 AND TO BE 27 CONSTRUCTED BY THE DEPARTMENT OF GENERAL SERVICES, ITS 28 SUCCESSORS OR ASSIGNS, AND TO BE FINANCED FROM CURRENT REVENUES 29 IN THE MOTOR LICENSE FUND SHALL BE $7,500,000. 30 SECTION 4. ITEMIZATION OF PUBLIC IMPROVEMENT PROJECTS. 19990H1023B3629 - 7 -
1 ADDITIONAL CAPITAL PROJECTS IN THE CATEGORY OF PUBLIC 2 IMPROVEMENT PROJECTS TO BE CONSTRUCTED OR ACQUIRED BY THE 3 DEPARTMENT OF GENERAL SERVICES, ITS SUCCESSORS OR ASSIGNS, AND 4 TO BE FINANCED BY THE INCURRING OF DEBT, ARE HEREBY ITEMIZED, 5 TOGETHER WITH THEIR RESPECTIVE ESTIMATED FINANCIAL COSTS, AS 6 FOLLOWS: 7 TOTAL 8 PROJECT 9 PROJECT ALLOCATION 10 (1) DEPARTMENT OF CONSERVATION AND NATURAL 11 RESOURCES 12 (I) FOREST DISTRICT 19 13 (A) REHABILITATION OF LILY POND DAM 500,000 14 (BASE PROJECT ALLOCATION - $417,000) 15 (DESIGN AND CONTINGENCIES - $83,000) 16 (II) FORT WASHINGTON STATE PARK 17 (A) EXTENSION OF WATER AND SEWER LINES AND 18 CONSTRUCTION OF MODERN COMFORT 19 FACILITIES 2,500,000 20 (BASE PROJECT ALLOCATION - $2,075,000) 21 (DESIGN AND CONTINGENCIES - $425,000) 22 (III) LEONARD HARRISON STATE PARK 23 (A) DEVELOPMENT OF WATER LINES, SEWER 24 COLLECTION SYSTEM AND CONSTRUCTION OF 25 MODERN COMFORT STATIONS 2,000,000 26 (BASE PROJECT ALLOCATION - $1,660,000) 27 (DESIGN AND CONTINGENCIES - $340,000) 28 (IV) LYMAN RUN STATE PARK 29 (A) REHABILITATION AND CONSTRUCTION OF A 30 NEW DAM 15,000,000 19990H1023B3629 - 8 -
1 (V) PRINCE GALLITZIN STATE PARK 2 (A) PHASE FOUR, MARINA IMPROVEMENTS 1,500,000 3 (BASE PROJECT ALLOCATION - $1,250,000) 4 (DESIGN AND CONTINGENCIES - $250,000) 5 (VI) SHIKELLAMY STATE PARK 6 (A) REHABILITATION OF INFLATABLE DAM 5,000,000 7 (BASE PROJECT ALLOCATION - $5,000,000) 8 (B) CONSTRUCTION OF A FISH PASSAGE AT THE 9 FABRIDAM IN SUNBURY 4,200,000 10 (BASE PROJECT ALLOCATION - $3,850,000) 11 (DESIGN AND CONTINGENCIES - $350,000) 12 (VII) SPROUL STATE FOREST 13 (A) ADDITIONAL FUNDS FOR DGS-173-74, 14 REHABILITATION OF HYNER VIEW ROAD. FOR 15 THIS ADDITIONAL FUNDS PROJECT AND THE 16 PROJECT AUTHORIZED IN SECTION 17 3(3)(VII)(A) OF THE ACT OF JULY 8, 1994 18 (P.L.444, NO.74), KNOWN AS THE CAPITAL 19 BUDGET PROJECT ITEMIZATION ACT FOR 20 1994-95, THE REHABILITATION OF HYNER 21 VIEW ROAD SHALL INCLUDE WIDENING, 22 DRAINAGE AND SHOULDER IMPROVEMENTS 23 ALONG RITCHIE ROAD AND OLD HYNER VIEW 24 ROAD AND IMPROVEMENTS TO HYNER VIEW 25 STATE PARK, INCLUDING, BUT NOT LIMITED 26 TO, THE CONSTRUCTION OF ADA ACCESSIBLE 27 PARKING, ADA ACCESSIBLE RESTROOM 28 FACILITIES, THE INSTALLATION OF 29 APPROPRIATE GUIDE RAILS AND SIGNAGE AND 30 IMPROVEMENTS TO THE OVERLOOK 400,000 19990H1023B3629 - 9 -
1 (B) REHABILITATION OF THE KATO/ORVISTON 2 ROAD 3.84 MILES 250,000 3 (2) DEPARTMENT OF CORRECTIONS 4 (I) STATE CORRECTIONAL INSTITUTION - CAMBRIDGE 5 SPRINGS 6 (A) INSTALL EMERGENCY GENERATOR, 7 SWITCHGEAR AND PERIMETER LIGHTING 2,000,000 8 (BASE PROJECT ALLOCATION - $1,600,000) 9 (DESIGN AND CONTINGENCIES - $400,000) 10 (II) STATE CORRECTIONAL INSTITUTION AT CAMP 11 HILL 12 (A) REPLACEMENT OF 12-FOOT FENCE WITH 14- 13 FOOT FENCE 1,000,000 14 (III) STATE CORRECTIONAL INSTITUTION - CRESSON 15 (A) ELECTRICAL SYSTEM UPGRADES 4,356,000 16 (BASE PROJECT ALLOCATION - $3,630,000) 17 (DESIGN AND CONTINGENCIES - $726,000) 18 (IV) STATE CORRECTIONAL INSTITUTION AT DALLAS 19 (A) CONSTRUCTION OF A NEW SECURITY FENCE 1,000,000 20 (V) STATE CORRECTIONAL INSTITUTION - 21 GRATERFORD 22 (A) SECURITY UPGRADES 13,020,000 23 (BASE PROJECT ALLOCATION - $10,850,000) 24 (DESIGN AND CONTINGENCIES - $2,170,000) 25 (B) CONSTRUCTION OF A 148-BED HOUSING 26 UNIT 6,720,000 27 (BASE PROJECT ALLOCATION - $5,600,000) 28 (DESIGN AND CONTINGENCIES - $1,120,000) 29 (VI) STATE CORRECTIONAL INSTITUTION - 30 HUNTINGDON 19990H1023B3629 - 10 -
1 (A) REPOINT AND SEAL PERIMETER BRICK WALL 773,000 2 (BASE PROJECT ALLOCATION - $644,000) 3 (DESIGN AND CONTINGENCIES - $129,000) 4 (B) CONSTRUCTION OF A 148-BED HOUSING 5 UNIT 6,720,000 6 (BASE PROJECT ALLOCATION - $5,600,000) 7 (DESIGN AND CONTINGENCIES - $1,120,000) 8 (VII) STATE REGIONAL CORRECTIONAL FACILITY - 9 MERCER 10 (A) ELECTRICAL SYSTEM UPGRADES 3,226,000 11 (BASE PROJECT ALLOCATION - $2,688,000) 12 (DESIGN AND CONTINGENCIES - $538,000) 13 (VIII) STATE CORRECTIONAL INSTITUTION AT MUNCY 14 (A) CONSTRUCTION OF A NEW SECOND SECURITY 15 FENCE 949,000 16 (IX) STATE CORRECTIONAL INSTITUTION - 17 PITTSBURGH 18 (A) RECONSTRUCT AND STABILIZE PERIMETER 19 WALL 1,201,000 20 (BASE PROJECT ALLOCATION - $1,001,000) 21 (DESIGN AND CONTINGENCIES - $200,000) 22 (X) STATE CORRECTIONAL INSTITUTION - ROCKVIEW 23 (A) CONSTRUCTION OF AN ADDITION TO THE 24 RESTRICTED HOUSING UNIT 4,032,000 25 (BASE PROJECT ALLOCATION - $3,360,000) 26 (DESIGN AND CONTINGENCIES - $672,000) 27 (B) NEW BOILER AND BOILER HOUSE 28 RENOVATIONS 1,478,000 29 (BASE PROJECT ALLOCATION - $1,232,000) 30 (DESIGN AND CONTINGENCIES - $246,000) 19990H1023B3629 - 11 -
1 (XI) STATE CORRECTIONAL INSTITUTION AT WAYMART 2 (A) CONSTRUCTION OF A NEW SECOND SECURITY 3 FENCE 600,000 4 (B) REPLACEMENT OF SEWAGE TREATMENT PLANT 5 AND EXPANSION OF COLLECTION SYSTEM 3,695,000 6 (BASE PROJECT ALLOCATION - $3,079,000) 7 (DESIGN AND CONTINGENCIES - $616,000) 8 (3) DEPARTMENT OF EDUCATION 9 (I) THADDEUS STEVENS COLLEGE OF TECHNOLOGY 10 (A) ADDITIONAL FUNDS FOR DGS PROJECT 417- 11 31, RENOVATION OF FIRE TOWERS AT 12 BRENNER HALL 500,000 13 (BASE PROJECT ALLOCATION - $417,000) 14 (DESIGN AND CONTINGENCIES - $83,000) 15 (II) LINCOLN UNIVERSITY 16 (A) COMMUNICATIONS AND ELECTRICAL 17 DISTRIBUTION SYSTEM REPLACEMENT 3,000,000 18 (BASE PROJECT ALLOCATION - $2,400,000) 19 (DESIGN AND CONTINGENCIES - $600,000) 20 (B) ADDITIONAL FUNDS FOR DGS PROJECT 1101- 21 24 FIRE ALARM AND SECURITY 750,000 22 (C) ADDITIONAL FUNDS FOR DGS PROJECT 1101- 23 25 STORM WATER DRAINAGE SYSTEM 416,000 24 (D) ADDITIONAL FUNDS FOR BOILER PLANT AND 25 STEAM DISTRIBUTION 3,150,000 26 (E) ADDITIONAL FUNDS FOR RENOVATION OF 27 UNIVERSITY HALL - UPGRADE OF BUILDING 28 SYSTEMS 500,000 29 (F) COMMUNICATIONS INFRASTRUCTURE 2,000,000 30 (BASE PROJECT ALLOCATION - $1,666,000) 19990H1023B3629 - 12 -
1 (DESIGN AND CONTINGENCIES - $334,000) 2 (G) CAMPUS LIGHTING 2,049,000 3 (BASE PROJECT ALLOCATION - $1,707,000) 4 (DESIGN AND CONTINGENCIES - $342,000) 5 (H) UPGRADE/REPLACEMENT OF WATER TREATMENT 6 PLANT 1,000,000 7 (BASE PROJECT ALLOCATION - $833,000) 8 (DESIGN AND CONTINGENCIES - $167,000) 9 (I) HVAC SYSTEM AND CONTROLS IN ACADEMIC 10 AND ADMINISTRATIVE BUILDINGS 2,000,000 11 (BASE PROJECT ALLOCATION - $1,666,000) 12 (DESIGN AND CONTINGENCIES - $334,000) 13 (J) STEAM BOILER REPLACEMENT 1,000,000 14 (BASE PROJECT ALLOCATION - $833,000) 15 (DESIGN AND CONTINGENCIES - $167,000) 16 (K) WATER TOWER UPGRADE 750,000 17 (BASE PROJECT ALLOCATION - $625,000) 18 (DESIGN AND CONTINGENCIES - $125,000) 19 (L) WATER DISTRIBUTION SYSTEM UPGRADE 5,000,000 20 (BASE PROJECT ALLOCATION - $4,166,000) 21 (DESIGN AND CONTINGENCIES - $834,000) 22 (M) ASBESTOS ABATEMENT 1,000,000 23 (BASE PROJECT ALLOCATION - $833,000) 24 (DESIGN AND CONTINGENCIES - $167,000) 25 (N) ROOF UPGRADES FOR RESIDENCE HALLS AND 26 ACADEMIC BUILDINGS 1,200,000 27 (BASE PROJECT ALLOCATION - $1,000,000) 28 (DESIGN AND CONTINGENCIES - $200,000) 29 (O) LIVING AND LEARNING CENTER HOT WATER 30 DISTRIBUTION 1,000,000 19990H1023B3629 - 13 -
1 (BASE PROJECT ALLOCATION - $833,000) 2 (DESIGN AND CONTINGENCIES - $167,000) 3 (P) LIFE SCIENCE VENTILATION UPGRADES TO 4 LABORATORY AREAS 6,500,000 5 (BASE PROJECT ALLOCATION - $5,416,000) 6 (DESIGN AND CONTINGENCIES - $1,084,000) 7 (Q) RENOVATION OF THE WARE CENTER USED FOR 8 THEATER ARTS 3,500,000 9 (BASE PROJECT ALLOCATION - $2,916,000) 10 (DESIGN AND CONTINGENCIES - $584,000) 11 (R) RENOVATION OF WRITE HALL CLASSROOMS 12 AND LABORATORIES 6,000,000 13 (BASE PROJECT ALLOCATION - $5,000,000) 14 (DESIGN AND CONTINGENCIES - $1,000,000) 15 (S) RENOVATION OF MANUEL RIFERO HALL FOR 16 PHYSICAL EDUCATION AND ATHLETICS 17 PROGRAMS 14,500,000 18 (BASE PROJECT ALLOCATION - $12,083,000) 19 (DESIGN AND CONTINGENCIES - $2,417,000) 20 (III) THE PENNSYLVANIA STATE UNIVERSITY 21 (A) CAPITAL RENEWAL AT UNIVERSITY PARK 22 CAMPUS 20,000,000 23 (BASE PROJECT ALLOCATION - $20,000,000) 24 (IV) TEMPLE UNIVERSITY 25 (A) RENOVATION OF BARTON HALL 6,800,000 26 (BASE PROJECT ALLOCATION - $5,667,000) 27 (DESIGN AND CONTINGENCIES - $1,133,000) 28 (4) EMERGENCY MANAGEMENT AGENCY 29 (I) SUPPORT FACILITIES AT STATE FIRE ACADEMY 30 (A) RECONSTRUCT AND UPGRADE SUPPORT 19990H1023B3629 - 14 -
1 FACILITIES AT THE STATE FIRE ACADEMY 2,760,000 2 (BASE PROJECT ALLOCATION - $2,300,000) 3 (DESIGN AND CONTINGENCIES - $460,000) 4 (5) DEPARTMENT OF ENVIRONMENTAL PROTECTION 5 (I) ALLEGHENY COUNTY 6 (A) ADDITIONAL FUNDS FOR LONG RUN 7 WATERSHED PROJECT IN MCKEESPORT 250,000 8 (II) LANCASTER COUNTY 9 (A) BOROUGH OF MARIETTA FLOOD PROTECTION 10 PROJECT 3,120,000 11 (BASE PROJECT ALLOCATION - $2,600,000) 12 (DESIGN AND CONTINGENCIES - $520,000) 13 (III) ASHLEY BOROUGH, LUZERNE COUNTY 14 (A) INSTALLATION OF RECTANGULAR CONCRETE 15 CHANNEL ON SULFUR RUN 2,520,000 16 (BASE PROJECT ALLOCATION - $2,100,000) 17 (DESIGN AND CONTINGENCIES - $420,000) 18 (IV) DUPONT, AVOCA AND DURYEA BOROUGHS, 19 LUZERNE COUNTY 20 (A) ADDITIONAL FUNDS FOR DGS PROJECT 184- 21 23 CONSTRUCTION OF CONCRETE CHANNEL FOR 22 MILL CREEK AND TRIBUTARIES 1,200,000 23 (BASE PROJECT ALLOCATION - $1,000,000) 24 (DESIGN AND CONTINGENCIES - $200,000) 25 (V) SCHUYLKILL COUNTY 26 (A) RECONSTRUCTION OF THE ABUTMENTS FOR 27 AUBURN DAM, SCHUYLKILL RIVER 180,000 28 (BASE PROJECT ALLOCATION - $150,000) 29 (DESIGN AND CONTINGENCIES - $30,000) 30 (6) DEPARTMENT OF GENERAL SERVICES 19990H1023B3629 - 15 -
1 (I) CAPITOL AREA BUILDINGS 2 (A) RENOVATIONS TO THE ARSENAL AND TENT 3 BUILDINGS AT THE PUBLIC WORKS COMPLEX 2,868,000 4 (BASE PROJECT ALLOCATION - $2,390,000) 5 (DESIGN AND CONTINGENCIES - $478,000) 6 (B) CONSTRUCTION OF THE COMMONWEALTH MAIL 7 PROCESSING AND LEGISLATIVE SERVICES 8 FACILITY 5,000,000 9 (II) CAPITOL COMPLEX 10 (A) CONNECT THE FINANCE AND FORUM 11 BUILDINGS TO CENTRAL REFRIGERATION 12 PLANT 12,000,000 13 (BASE PROJECT ALLOCATION - $10,000,000) 14 (DESIGN AND CONTINGENCIES - $2,000,000) 15 (B) REPLACEMENT OF ROOF AND RAIN LEADERS 16 AND RECONSTRUCT PARAPET ON SOUTH OFFICE 17 BUILDING 1,800,000 18 (BASE PROJECT ALLOCATION - $1,500,000) 19 (DESIGN AND CONTINGENCIES - $300,000) 20 (C) FOUNDATION WATERPROOFING OF HEALTH AND 21 WELFARE BUILDING 600,000 22 (BASE PROJECT ALLOCATION - $500,000) 23 DESIGN AND CONTINGENCIES - $100,000) 24 (D) ADDITIONAL FUNDS FOR DGS 948-53, 25 REPAIR AND RENOVATION OF THE CAPITOL 26 COMPLEX. IN ADDITION TO MISCELLANEOUS 27 RENOVATIONS AND REPAIRS WITHIN THE 28 CAPITOL COMPLEX THIS PROJECT SHALL BE 29 FOR IMPROVEMENTS AND REPAIRS TO 30 FACILITIES IN THE CAPITOL COMPLEX TO 19990H1023B3629 - 16 -
1 ENHANCE PERIMETER AND EXTERIOR SECURITY 2 AND SAFETY, UPGRADE SERVICES TO THE 3 FACILITIES, AND OTHER CODE IMPROVEMENTS 4 AND RENOVATIONS TO ENHANCE FACILITY 5 OPERATIONS 30,000,000 6 (BASE PROJECT ALLOCATION - $26,000,000) 7 (DESIGN AND CONTINGENCIES - $4,000,000) 8 (E) ADDITIONAL FUNDS FOR DGS-948-35, FIRE 9 SAFETY CODE IMPROVEMENTS. IN ADDITION 10 TO FIRE SAFETY CODE IMPROVEMENTS AND 11 MISCELLANEOUS RENOVATIONS AND REPAIRS 12 FOR THE CAPITOL BUILDING, NORTH OFFICE 13 BUILDING AND THE SOUTH OFFICE BUILDING, 14 THIS PROJECT SHALL BE FOR IMPROVEMENTS 15 AND REPAIRS TO UPGRADE SERVICES TO THE 16 FACILITIES AND OTHER CODE IMPROVEMENTS 17 OR RENOVATIONS TO ENHANCE FACILITY 18 OPERATIONS 10,000,000 19 (III) LIEUTENANT GOVERNOR'S RESIDENCE 20 (A) UPGRADES TO THE SMOKE DETECTION, FIRE 21 ALARM AND SECURITY SYSTEMS 480,000 22 (BASE PROJECT ALLOCATION - $400,000) 23 (DESIGN AND CONTINGENCIES - $80,000) 24 (7) HISTORICAL AND MUSEUM COMMISSION 25 (I) DANIEL BOONE HOMESTEAD 26 (A) CONSTRUCT PERMANENT EXHIBITS 720,000 27 (BASE PROJECT ALLOCATION - $600,000) 28 (DESIGN AND CONTINGENCIES - $120,000) 29 (II) OLD ECONOMY VILLAGE 30 (A) SITE IMPROVEMENTS AND MECHANICAL 19990H1023B3629 - 17 -
1 BUILDING SYSTEMS UPGRADES 1,200,000 2 (BASE PROJECT ALLOCATION - $1,000,000) 3 (DESIGN AND CONTINGENCIES - $200,000) 4 (8) DEPARTMENT OF MILITARY AND VETERANS AFFAIRS 5 (I) SCOTLAND SCHOOL FOR VETERANS' CHILDREN, 6 FRANKLIN COUNTY 7 (A) RENOVATION OF MAIN SCHOOL BUILDING AND 8 NINE COTTAGES 4,102,000 9 (BASE PROJECT ALLOCATION - $3,418,000) 10 (DESIGN AND CONTINGENCIES - $684,000) 11 (II) PENNSYLVANIA NATIONAL GUARD ARMORY, 12 BOROUGH OF MEDIA 13 (A) ACQUISITION OF SITE AND RENOVATIONS TO 14 THE BALTIMORE PIKE SITE 1,200,000 15 (III) PENNSYLVANIA NATIONAL GUARD ARMORY, 16 MERCER COUNTY 17 (A) CONSTRUCTION AND LAND ACQUISITION FOR 18 A NEW ARMORY 1,300,000 19 (BASE PROJECT ALLOCATION - $1,000,000) 20 (LAND ALLOCATION - $100,000) 21 (DESIGN AND CONTINGENCIES - $200,000) 22 (9) DEPARTMENT OF PUBLIC WELFARE 23 (I) HARRISBURG STATE HOSPITAL 24 (A) IMPROVEMENTS TO ELECTRICAL 25 DISTRIBUTION SYSTEM IN BUILDING NOS. 26 11, 15, 32 AND 53 900,000 27 (BASE PROJECT ALLOCATION - $750,000) 28 (DESIGN AND CONTINGENCIES - $150,000) 29 (II) NORRISTOWN STATE HOSPITAL 30 (A) INSTALL SECURITY FENCE AND AIR 19990H1023B3629 - 18 -
1 CONDITIONING AT FORENSIC UNIT 2,880,000 2 (BASE PROJECT ALLOCATION - $2,400,000) 3 (DESIGN AND CONTINGENCIES - $480,000) 4 (B) ADDITIONAL FUNDS FOR DGS-509-26, AIR 5 CONDITIONING OF PATIENT BUILDING NO.12 500,000 6 (BASE PROJECT ALLOCATION - $500,000) 7 (III) EBENSBURG CENTER 8 (A) PRIMARY ELECTRICAL UPGRADE 1,152,000 9 (BASE PROJECT ALLOCATION - $960,000) 10 (DESIGN AND CONTINGENCIES - $192,000) 11 (IV) SOUTHWEST SECURE TREATMENT UNIT 12 (A) RENOVATION OF HVAC SYSTEMS IN THE 13 WISEMAN BUILDING 1,680,000 14 (BASE PROJECT ALLOCATION - $1,400,000) 15 (DESIGN AND CONTINGENCIES - $280,000) 16 (10) PENNSYLVANIA STATE POLICE 17 (I) HOLLIDAYSBURG HEADQUARTERS 18 (A) ADDITIONAL FUNDS FOR DGS PROJECT 201- 19 3, CONSTRUCTION OF A NEW HEADQUARTERS 20 BUILDING 2,400,000 21 (BASE PROJECT ALLOCATION - $2,000,000) 22 (DESIGN AND CONTINGENCIES - $400,000) 23 (II) FIREARMS TRAINING CENTER IN MONTGOMERY 24 COUNTY 25 (A) LAND ACQUISITION, DESIGN AND 26 CONSTRUCTION OF AN INDOOR FIREARMS 27 TRAINING CENTER 5,000,000 28 (11) DEPARTMENT OF TRANSPORTATION 29 (I) FORT PITT TUNNEL MAINTENANCE FACILITY 30 (A) CONSTRUCT OR ACQUIRE A REPLACEMENT 19990H1023B3629 - 19 -
1 MAINTENANCE FACILITY 1,850,000 2 (BASE PROJECT ALLOCATION - $1,250,000) 3 (LAND ALLOCATION - $500,000) 4 (DESIGN AND CONTINGENCIES - $100,000) 5 (II) HIGHWAY SIGN PRODUCTION/DISTRIBUTION 6 FACILITY 7 (A) REPLACE SIGN PRODUCTION/DISTRIBUTION 8 FACILITY 3,080,000 9 (BASE PROJECT ALLOCATION - $2,600,000) 10 (LAND ALLOCATION - $200,000) 11 (DESIGN AND CONTINGENCIES - $280,000) 12 (III) ALLEGHENY COUNTY 13 (A) PRECONSTRUCTION AND CONSTRUCTION OF A 14 DOWNTOWN URBAN SHUTTLE SYSTEM IN THE 15 CITY OF PITTSBURGH USING LOW-SPEED 16 SUPERCONDUCTIVE MAGLEV TECHNOLOGY. 17 FUNDS WILL BE USED TO MATCH FEDERAL 18 FUNDS CONTAINED IN THE TRANSPORTATION 19 EQUITY ACT FOR THE 21ST CENTURY, AS 20 AMENDED PROVIDING FOR THE DEVELOPMENT 21 AND CONSTRUCTION OF A LOW-SPEED MAGLEV 22 SYSTEM IN THE CITY OF PITTSBURGH 1,375,000 23 (IV) MONROE COUNTY 24 (A) ADDITIONAL FUNDS FOR DGS-657- , 25 DELAWARE WATER GAP WELCOME CENTER, 26 INTERSTATE 80 3,000,000 27 (12) STATE SYSTEM OF HIGHER EDUCATION 28 (I) BLOOMSBURG UNIVERSITY 29 (A) ADDITION TO SUTLIFF HALL 7,800,000 30 (B) RENOVATION OF NAVY HALL 4,710,000 19990H1023B3629 - 20 -
1 (II) CALIFORNIA UNIVERSITY 2 (A) PEDESTRIAN AND VEHICLE ENHANCEMENT, 3 PHASE II 7,940,000 4 (B) CONSTRUCTION OF A CONVOCATION - 5 ATHLETIC - RECREATION CENTER 16,413,000 6 (III) CHEYNEY UNIVERSITY 7 (A) DEMOLITION OF EVANGELINE RACHEL HALL 8 EDUCATION BUILDING AND WATER TOWER 2,000,000 9 (BASE PROJECT ALLOCATION - $1,667,000) 10 (DESIGN AND CONTINGENCIES - $333,000) 11 (B) RENOVATION OF ENTRANCE AND ACCESS 12 ROADWAYS/LOTS 2,800,000 13 (C) RENOVATION OF HARRIS-TURNER CENTER 3,995,000 14 (D) RENOVATION OF MARIAN ANDERSON MUSIC 15 BUILDING 5,600,000 16 (E) RENOVATION OF COPE HALL 4,995,000 17 (F) RENOVATION OF ELLIS POWER PLANT 8,995,000 18 (G) RENOVATION OF JONES-HILTON BUILDING 2,890,000 19 (H) RENOVATION OF WADE WILSON BUILDING 4,500,000 20 (I) ADDITIONAL FUNDS FOR DGS 403-66, 21 RENOVATION OF BIDDLE HALL 700,000 22 (IV) CLARION UNIVERSITY 23 (A) REPAIR BY REPLACEMENT, PEIRCE SCIENCE 24 CENTER 27,146,000 25 (V) EAST STROUDSBURG UNIVERSITY 26 (A) LAND ACQUISITION FOR EXPANSION OF 27 CAMPUS 1,850,000 28 (B) RENOVATION OF ROSENKRANS HALL 3,875,000 29 (VI) EDINBORO UNIVERSITY 30 (A) RENOVATION OF HAMILTON HALL 5,550,000 19990H1023B3629 - 21 -
1 (B) RENOVATION OF SOX HARRISON STADIUM 996,000 2 (C) RENOVATION OF LEADER CLINIC 760,000 3 (D) RENOVATION/REPLACEMENT OF WHITE HALL 990,000 4 (VII) INDIANA UNIVERSITY 5 (A) ADDITION TO/RENOVATION OF FISHER 6 AUDITORIUM 9,354,000 7 (B) RENOVATION OF WILSON HALL 2,749,000 8 (C) ADDITION TO/RENOVATION OF ACKERMAN 9 HALL 5,526,000 10 (D) RENOVATION OF STEAM DISTRIBUTION AND 11 TUNNELS 1,590,000 12 (E) UPGRADE OF ELECTRICAL DISTRIBUTION 13 SYSTEM 1,921,000 14 (F) RENOVATION OF BOILER PLANT 3,288,000 15 (VIII) KUTZTOWN UNIVERSITY 16 (A) RENOVATION OF OLD MAIN, PHASE IV 5,176,000 17 (B) LIFE CYCLE RENOVATION OF DEFRANCESCO 18 BUILDING 4,940,000 19 (IX) LOCK HAVEN UNIVERSITY 20 (A) RENOVATION OF RAUB HALL 4,896,000 21 (B) CONSTRUCTION OF INDOOR ATHLETIC 22 FACILITY - CLEARFIELD 7,975,000 23 (X) MANSFIELD UNIVERSITY 24 (A) RENOVATION OF MEMORIAL HALL 1,462,000 25 (B) RENOVATION OF DECKER GYMNASIUM 6,480,000 26 (C) RENOVATION OF VAN NORMAN ATHLETIC 27 COMPLEX 4,156,000 28 (XI) MILLERSVILLE UNIVERSITY 29 (A) ADDITION TO EDUCATION BUILDING 3,418,000 30 (B) LIFE CYCLE RENOVATION OF BROOKS HALL 4,544,000 19990H1023B3629 - 22 -
1 (C) LIFE CYCLE RENOVATION OF WITMER HALL 2,062,000 2 (D) RENOVATION OF OSBURN HALL 4,198,000 3 (XII) SHIPPENSBURG UNIVERSITY 4 (A) MODERNIZE CAMPUS STEAM PLANT 6,660,000 5 (B) RENOVATION OF ROWLAND AND SHEARER 6 HALLS 5,167,000 7 (XIII) SLIPPERY ROCK UNIVERSITY 8 (A) RENOVATION OF EISENBERG CLASSROOM 9 BUILDING 6,300,000 10 (B) RENOVATION OF MALTBY AND LOWRY 11 BUILDING 3,300,000 12 (C) RENOVATION OF MCKAY EDUCATION 13 BUILDING 3,360,000 14 (D) REPLACEMENT OF VINCENT SCIENCE 15 BUILDING 14,442,000 16 (XIV) WEST CHESTER UNIVERSITY 17 (A) CONSTRUCTION OF CLASSROOM BUILDING, 18 PHASE II 25,216,000 19 (B) LAND ACQUISITION FOR CAMPUS EXPANSION 10,600,000 20 (C) RESTORE/EXPAND GLENN ECHO CONFERENCE 21 CENTER 2,016,000 22 (D) RENOVATION OF FHG LIBRARY 18,546,000 23 (E) CONSTRUCTION OF STUDENT HEALTH CENTER 3,541,000 24 SECTION 5. ITEMIZATION OF FURNITURE AND EQUIPMENT PROJECTS. 25 ADDITIONAL CAPITAL PROJECTS IN THE CATEGORY OF PUBLIC 26 IMPROVEMENT PROJECTS CONSISTING OF THE ACQUISITION OF MOVABLE 27 FURNITURE AND EQUIPMENT TO COMPLETE PUBLIC IMPROVEMENT PROJECTS 28 AND TO BE PURCHASED BY THE DEPARTMENT OF GENERAL SERVICES, ITS 29 SUCCESSORS OR ASSIGNS, AND TO BE FINANCED BY THE INCURRING OF 30 DEBT, ARE HEREBY ITEMIZED, TOGETHER WITH THEIR RESPECTIVE 19990H1023B3629 - 23 -
1 ESTIMATED FINANCIAL COSTS, AS FOLLOWS: 2 TOTAL 3 PROJECT 4 PROJECT ALLOCATION 5 (1) DEPARTMENT OF CONSERVATION AND NATURAL 6 RESOURCES 7 (I) GREENWOOD FURNACE STATE PARK 8 (A) FURNITURE AND EQUIPMENT FOR DGS 9 PROJECT 129-1, IMPROVEMENTS TO PICNIC 10 AND CAMPING FACILITIES 90,000 11 (BASE PROJECT ALLOCATION - $90,000) 12 (B) FURNITURE AND EQUIPMENT FOR DGS 13 PROJECT 129-2, REHABILITATE PARK 14 ADMINISTRATION AND SUPPORT FACILITIES 90,000 15 (BASE PROJECT ALLOCATION - $90,000) 16 (II) PYMATUNING STATE PARK 17 (A) FURNITURE AND EQUIPMENT FOR DGS 18 PROJECT 103-4, REHABILITATION OF THE 19 LINEVILLE BOAT LIVERY 100,000 20 (BASE PROJECT ALLOCATION - $100,000) 21 (2) DEPARTMENT OF EDUCATION 22 (I) LINCOLN UNIVERSITY 23 (A) NEW FURNITURE AND EQUIPMENT FOR DGS- 24 1101-23, INTERNATIONAL CULTURAL CENTER 3,100,000 25 (3) DEPARTMENT OF GENERAL SERVICES 26 (I) CAPITOL AREA BUILDINGS 27 (A) FURNITURE AND EQUIPMENT FOR 28 COMMONWEALTH MAIL PROCESSING AND 29 LEGISLATIVE SERVICES FACILITY 8,000,000 30 (4) STATE SYSTEM OF HIGHER EDUCATION 19990H1023B3629 - 24 -
1 (I) CHEYNEY UNIVERSITY 2 (A) FURNITURE AND EQUIPMENT FOR DGS 3 PROJECT TO RENOVATE MELROSE HOSPITALITY 4 CENTER 30,000 5 (BASE PROJECT ALLOCATION - $30,000) 6 (B) FURNITURE AND EQUIPMENT FOR DGS 7 PROJECT TO RENOVATE THE ADA GEORGES 8 DINING HALL 65,000 9 (BASE PROJECT ALLOCATION - $65,000) 10 (C) FURNITURE AND EQUIPMENT TO RENOVATE 11 HALL EDUCATION CENTER 660,000 12 (D) FURNITURE AND EQUIPMENT TO RENOVATE 13 VAUX/LIGAN 639,000 14 (II) EAST STROUDSBURG UNIVERSITY 15 (A) FURNITURE AND EQUIPMENT FOR FINE AND 16 PERFORMING ARTS CENTER 108,000 17 (III) EDINBORO UNIVERSITY 18 (A) FURNITURE AND EQUIPMENT FOR DGS-406- 19 39, AUDITORIUM 400,000 20 (IV) LOCK HAVEN UNIVERSITY 21 (A) FURNITURE AND EQUIPMENT FOR DGS-409-56 22 FOR CLEARFIELD CAMPUS 500,000 23 (V) MANSFIELD UNIVERSITY 24 (A) FURNITURE AND EQUIPMENT FOR GRANT 25 SCIENCE HALL 996,000 26 (B) FURNITURE AND EQUIPMENT FOR HOME 27 ECONOMICS BUILDING 420,000 28 (VI) MILLERSVILLE UNIVERSITY 29 (A) ORIGINAL FURNITURE AND EQUIPMENT 30 MCCOMSEY HALL 766,000 19990H1023B3629 - 25 -
1 (VII) SLIPPERY ROCK UNIVERSITY 2 (A) FURNITURE AND EQUIPMENT FOR WEST HALL 230,000 3 SECTION 6. ITEMIZATION OF TRANSPORTATION ASSISTANCE PROJECTS. 4 (A) MASS TRANSIT.--ADDITIONAL CAPITAL PROJECTS IN THE 5 CATEGORY OF TRANSPORTATION ASSISTANCE PROJECTS FOR MASS TRANSIT 6 IN WHICH AN INTEREST IS TO BE ACQUIRED OR CONSTRUCTED BY THE 7 DEPARTMENT OF TRANSPORTATION, ITS SUCCESSORS OR ASSIGNS, AND TO 8 BE FINANCED BY THE INCURRING OF DEBT, ARE HEREBY ITEMIZED, 9 TOGETHER WITH THEIR ESTIMATED FINANCIAL COSTS, AS FOLLOWS: 10 TOTAL 11 PROJECT 12 PROJECT ALLOCATION 13 (1) BERKS AND READING TRANSPORTATION AUTHORITY 14 (I) FFY 1999 SECTION 3 ACQUISITION OF 15 15 REPLACEMENT TRANSIT BUSES 833,000 16 (BASE PROJECT ALLOCATION - $833,000) 17 (II) FFY 1999 SECTION 9 ACQUISITION OF 10 18 PARATRANSIT VEHICLES 416,000 19 (BASE PROJECT ALLOCATION - $416,000) 20 (III) FFY 2000 SECTION 3 ACQUISITION OF 16 21 TRANSIT BUSES 1,000,000 22 (BASE PROJECT ALLOCATION - $1,000,000) 23 (IV) FFY 1999 SECTION 9 ACQUISITION OF 10 24 PARATRANSIT VEHICLES 500,000 25 (BASE PROJECT ALLOCATION - $500,000) 26 (V) DOWNTOWN INTERMODAL FACILITY, PHASE II 500,000 27 (BASE PROJECT ALLOCATION -$500,000) 28 (2) BEAVER COUNTY TRANSIT AUTHORITY 29 (I) CONSTRUCTION OF AN EXPRESSWAY TRAVEL 30 CENTER 563,000 19990H1023B3629 - 26 -
1 (BASE PROJECT ALLOCATION - $563,000) 2 (II) INSTALLATION OF MOBILITY MANAGER 3 TECHNOLOGY 200,000 4 (BASE PROJECT ALLOCATION - $200,000) 5 (III) ACQUISITION AND DEVELOPMENT OF FORMER K- 6 MART STORE SITE AND CONSTRUCTION OF A FLEET 7 MAINTENANCE CENTER 1,000,000 8 (3) CENTRE AREA TRANSIT AUTHORITY 9 (I) INTERMODAL TRANSIT CENTER 833,000 10 (BASE PROJECT ALLOCATION - $833,000) 11 (II) EXPANSION OF ADMINISTRATIVE AND 12 OPERATIONS OFFICES 83,000 13 (BASE PROJECT ALLOCATION - $83,000) 14 (III) PARK-N-RIDE LOTS 100,000 15 (BASE PROJECT ALLOCATION - $100,000) 16 (4) CAMBRIA COUNTY TRANSIT AUTHORITY 17 (I) SATELLITE OPERATIONS AND MAINTENANCE 18 FACILITY 133,000 19 (BASE PROJECT ALLOCATION - $133,000) 20 (5) LACKAWANNA COUNTY TRANSIT SYSTEM 21 (I) DOWNTOWN INTERMODAL TRANSIT FACILITY 208,000 22 (BASE PROJECT ALLOCATION - $208,000) 23 (6) ERIE METROPOLITAN TRANSIT AUTHORITY 24 (I) COMPRESSED NATURAL GAS (CNG) BUS 25 ACQUISITION 340,000 26 (BASE PROJECT ALLOCATION - $340,000) 27 (II) FFY 1999 TRANSIT BUS ACQUISITION 325,000 28 (BASE PROJECT ALLOCATION - $325,000) 29 (III) FFY 2000 TRANSIT BUS ACQUISITION 188,000 30 (BASE PROJECT ALLOCATION - $188,000) 19990H1023B3629 - 27 -
1 (7) FAYETTE COUNTY TRANSIT 2 (I) BUS ACQUISITION 431,000 3 (BASE PROJECT ALLOCATION - $431,000) 4 (8) LEHIGH AND NORTHAMPTON TRANSPORTATION 5 AUTHORITY 6 (I) BUS PROCUREMENT 533,000 7 (BASE PROJECT ALLOCATION - $533,000) 8 (9) PORT AUTHORITY OF ALLEGHENY COUNTY 9 (I) BUS PROCUREMENT 10,000,000 10 (BASE PROJECT ALLOCATION - $10,000,000) 11 (II) NORTH SHORE CONNECTOR 8,333,000 12 (BASE PROJECT ALLOCATION - $8,333,000) 13 (III) FFY 1999 THROUGH 2002 ADDITIONAL FEDERAL 14 FLEX FUNDING 1,250,000 15 (BASE PROJECT ALLOCATION - $1,250,000) 16 (10) SOUTHEASTERN PENNSYLVANIA TRANSPORTATION 17 AUTHORITY 18 (I) FFY 2001 SECTION 9 PROGRAM 10,833,000 19 (BASE PROJECT ALLOCATION - $10,833,000) 20 (II) FFY 2001 SECTION 3 FIXED GUIDEWAY 21 PROGRAM 15,625,000 22 (BASE PROJECT ALLOCATION - $15,625,000) 23 (III) GIRARD AVENUE LIGHT RAIL INFRASTRUCTURE 625,000 24 (BASE PROJECT ALLOCATION - $625,000) 25 (IV) EXTENSION OF RAIL SERVICE ELWYN TO WAWA 1,667,000 26 (BASE PROJECT ALLOCATION - $1,667,000) 27 (V) FRANKFORT TRANSPORTATION CENTER 1,042,000 28 (BASE PROJECT ALLOCATION - $1,042,000) 29 (VI) PAOLI TRANSPORTATION CENTER 208,000 30 (BASE PROJECT ALLOCATION - $208,000) 19990H1023B3629 - 28 -
1 (VII) 1999-2000 VEHICLE OVERHAUL 42,000,000 2 (BASE PROJECT ALLOCATION - $42,000,000) 3 (VIII) 2000-2001 VEHICLE OVERHAUL 42,000,000 4 (BASE PROJECT ALLOCATION - $42,000,000) 5 (IX) SILVERLINER PROPULSION SYSTEM UPGRADES 625,000 6 (BASE PROJECT ALLOCATION - $625,000) 7 (X) FFY 2001 BUS PURCHASE 3,563,000 8 (BASE PROJECT ALLOCATION - $3,563,000) 9 (XI) FFY 2001 FLEX FUNDING PROGRAM 3,698,000 10 (BASE PROJECT ALLOCATION - $3,698,000) 11 (XII) 1999-2000 INFRASTRUCTURE SAFETY RENEWAL 12 PROJECTS 15,000,000 13 (BASE PROJECT ALLOCATION - $15,000,000) 14 (XIII) 2000-2001 INFRASTRUCTURE SAFETY RENEWAL 15 PROJECTS 15,000,000 16 (BASE PROJECT ALLOCATION - $15,000,000) 17 (XIV) DESIGN AND CONSTRUCTION OF SCHUYLKILL 18 VALLEY AND CROSS COUNTY METROS 300,000,000 19 (XV) CROSS COUNTRY METRO - PRELIMINARY 20 ENGINEERING 417,000 21 (11) SHENANGO VALLEY SHUTTLE SERVICE 22 (I) BUS PURCHASE 88,000 23 (BASE PROJECT ALLOCATION - $88,000) 24 (12) DEPARTMENT OF TRANSPORTATION 25 (I) ADDITIONAL FUNDING FOR THE KEYSTONE RAIL 26 INITIATIVE 4,000,000 27 (BASE PROJECT ALLOCATION - $4,000,000) 28 (II) PRECONSTRUCTION OF A REGIONAL HIGH-SPEED 29 MAGNETIC LEVITATION DEMONSTRATION PROJECT 1,250,000 30 (B) RURAL AND INTERCITY RAIL.--ADDITIONAL CAPITAL PROJECTS 19990H1023B3629 - 29 -
1 IN THE CATEGORY OF TRANSPORTATION ASSISTANCE PROJECTS FOR RURAL 2 AND INTERCITY RAIL SERVICE PROJECTS TO BE CONSTRUCTED OR WITH 3 RESPECT TO WHICH AN INTEREST IS TO BE ACQUIRED BY THE DEPARTMENT 4 OF TRANSPORTATION, ITS SUCCESSORS OR ASSIGNS, AND TO BE FINANCED 5 BY THE INCURRING OF DEBT, ARE HEREBY ITEMIZED, TOGETHER WITH 6 THEIR RESPECTIVE ESTIMATED FINANCIAL COSTS, AS FOLLOWS: 7 TOTAL 8 PROJECT 9 PROJECT ALLOCATION 10 (1) BUFFALO & PITTSBURGH RAILROAD 11 (I) ARMSTRONG COUNTY 12 (A) REHABILITATION OF ALLEGHENY RIVER 13 BRIDGE OF BUFFALO & PITTSBURGH RAILROAD 14 INCLUDING REPLACEMENT OF TIES, BEARINGS 15 AND DECKING REPAIRS 880,000 16 (BASE PROJECT ALLOCATION - $800,000) 17 (DESIGN AND CONTINGENCIES - $80,000) 18 (II) BUTLER COUNTY 19 (A) REHABILITATION OF BUTLER YARD 20 INCLUDING REHABILITATION OF AREA 21 SIDINGS AND THE REPLACEMENT OF RAIL, 22 TIES, SWITCHES AND SURFACING 1,320,000 23 (BASE PROJECT ALLOCATION - $1,200,000) 24 (DESIGN AND CONTINGENCIES - $120,000) 25 (III) CLEARFIELD COUNTY 26 (A) REHABILITATION OF THE DUBOIS YARD 27 INCLUDING REPLACEMENT OF RAIL, TIES, 28 SWITCHES AND SURFACING TO HANDLE 29 286,000-POUND CARS 1,320,000 30 (BASE PROJECT ALLOCATION - $1,200,000) 19990H1023B3629 - 30 -
1 (DESIGN AND CONTINGENCIES - $120,000) 2 (2) PITTSBURGH & SHAWMUT RAILROAD 3 (I) ARMSTRONG COUNTY 4 (A) CONSTRUCTION OF RAIL SIDING TO ACCESS 5 FREEPORT TERMINAL LOCATED IN FREEPORT, 6 FROM THE PITTSBURGH & SHAWMUT RAILROAD, 7 INCLUDING A NEW RAIL SPUR WITH MULTIPLE 8 SIDINGS FOR TRANSFER AND LOADING AND 9 UNLOADING OF VARIOUS COMMODITIES AND 10 CONSTRUCTION OF A CONNECTION TO 11 EXISTING RAILROAD INCLUDING ACCESS 12 UNDER THE NORFOLK SOUTHERN CONEMAUGH 13 LINE 3,850,000 14 (BASE PROJECT ALLOCATION - $3,500,000) 15 (DESIGN AND CONTINGENCIES - $350,000) 16 (B) CONSTRUCTION OF A NEW RAIL SIDING TO 17 ACCESS ROSEBUD MINING CLINTON RESERVE 18 TO HANDLE THE EQUIVALENT OF 240 CARS 19 FOR CONTINUOUS LOADING AND UNLOADING 20 OFF THE MAIN LINE. INCLUDE ALL RAIL 21 INFRASTRUCTURE INCLUDING EXCAVATION 2,750,000 22 (BASE PROJECT ALLOCATION - $2,500,000) 23 (DESIGN AND CONTINGENCIES - $250,000) 24 (II) UPGRADE PITTSBURGH & SHAWMUT CONNECTION 25 AT FALLS CREEK 330,000 26 (BASE PROJECT ALLOCATION - $300,000) 27 (DESIGN AND CONTINGENCIES - $30,000) 28 (III) UPGRADE RIKER YARD AT PUNXSUTAWNEY TO 29 INCREASE CAPACITY INCLUDING RAIL, RAILROAD 30 TIES, BALLAST, SWITCHES AND OTHER RELATED 19990H1023B3629 - 31 -
1 INFRASTRUCTURE IMPROVEMENTS AND EXPAND 2 BUTLER YARD CAPACITY INCLUDING RAIL, 3 RAILROAD TIES, BALLAST, ADDITIONAL SWITCHES 4 AND OTHER RELATED INFRASTRUCTURE 5 IMPROVEMENTS 1,100,000 6 (BASE PROJECT ALLOCATION - $1,000,000) 7 (DESIGN AND CONTINGENCIES - $100,000) 8 (IV) REPLACE SELECTED RAIL AND RAILROAD TIES 9 ON VARIOUS CURVES AND REPLACE VARIOUS 10 SWITCHES AND SIGNALS TO HANDLE ADDITIONAL 11 STRESS AND WEIGHT BETWEEN PUNXSUTAWNEY AND 12 BRADFORD 1,320,000 13 (BASE PROJECT ALLOCATION - $1,200,000) 14 (DESIGN AND CONTINGENCIES - $120,000) 15 (3) PHILADELPHIA COUNTY, PHILADELPHIA INDUSTRIAL 16 DEVELOPMENT CORPORATION 17 (I) FOR THE ACQUISITION, REHABILITATION, 18 RECONSTRUCTION AND CONSTRUCTION OF RAILROAD 19 TRACK ON A RIGHT-OF-WAY LOCATED ON AND 20 ADJACENT TO THE NEW DEPENDABLE DISTRIBUTION 21 SITE BETWEEN BUCKIUS STREET AND ORTHODOX 22 STREET. THESE FUNDS WILL BE USED FOR ANY 23 AND ALL WORK, INCLUDING, BUT NOT LIMITED 24 TO, ACQUISITION, DESIGN, ENGINEERING AND 25 CONSULTATIVE SERVICES, SWITCHES AND 26 SIDETRACKS, AND POWER TRANSMISSION TOWER 27 RELOCATION, NECESSARY TO REACTIVATE AND 28 ACTIVATE THE RAIL LINE AND RAIL SERVICE 29 INTO AND ON THE SITE 1,000,000 30 (4) PHILADELPHIA COUNTY, SJA CONSTRUCTION INC. 19990H1023B3629 - 32 -
1 (I) REHABILITATION OF TRACK, INCLUDING RAIL, 2 TIES, SWITCHES AND ANY OTHER TRACK-RELATED 3 REPAIR WORK AND THE PURCHASE OF REQUIRED 4 LOADING AND UNLOADING EQUIPMENT FOR USE AT 5 THE RAIL FACILITY AT GIRARD POINT 900,000 6 (5) READING BLUE MOUNTAIN AND NORTHERN RAILROAD 7 COMPANY 8 (I) REHABILITATION OF THE TRACK INCLUDING 9 CROSS TIE REPLACEMENT, GRADE CROSSING 10 RENEWAL, TRACK SURFACING, SIGNAL REPAIR AND 11 ANY OTHER RELATED TRACK REPAIR WORK, BERKS, 12 CARBON, LACKAWANNA, LUZERNE, SCHUYLKILL AND 13 WYOMING COUNTIES 1,500,000 14 (II) REPLACEMENT OF WELDED RAIL LAND AND ANY 15 OTHER RELATED TRACK REPAIR WORK, BERKS AND 16 SCHUYLKILL COUNTIES 1,500,000 17 (6) DELAWARE AND HUDSON RAILWAY 18 (I) COLUMBIA COUNTY 19 (A) REHABILITATION OF DELAWARE AND HUDSON 20 MAIN LINE FROM MILEPOST 722 TO MILEPOST 21 729, INCLUDING BALLAST UNDERCUTS AND 22 REPLACEMENT OF TIES AND WORN RAIL 1,403,000 23 (BASE PROJECT ALLOCATION - $1,275,000) 24 (DESIGN AND CONTINGENCIES - $128,000) 25 (II) LACKAWANNA COUNTY 26 (A) INSTALL NEW TRACK AND TURNOUTS TO 27 EXPAND SWITCHING CAPACITY AT TAYLOR 28 YARD TO SERVICE GROWING CUSTOMER NEEDS 29 IN NORTHEAST PENNSYLVANIA 2,750,000 30 (BASE PROJECT ALLOCATION - $2,500,000) 19990H1023B3629 - 33 -
1 (DESIGN AND CONTINGENCIES - $250,000) 2 (III) LUZERNE COUNTY 3 (A) REBUILD FORMER RAILROAD SIDING IN 4 HANOVER TO INCREASE CAPACITY ON SUNBURY 5 MAIN LINE OF DELAWARE AND HUDSON 6 RAILWAY AND TO REDUCE RAIL CONGESTION 7 AND PROVIDE BETTER CUSTOMER SERVICE 2,200,000 8 (BASE PROJECT ALLOCATION - $2,000,000) 9 (DESIGN AND CONTINGENCIES - $200,000) 10 (B) REHABILITATION OF DELAWARE AND HUDSON 11 MAIN LINE FROM MILEPOST 688 TO MILEPOST 12 713, INCLUDING BALLAST UNDERCUTS AND 13 REPLACEMENT OF TIES AND WORN RAIL 1,084,000 14 (BASE PROJECT ALLOCATION - $985,000) 15 (DESIGN AND CONTINGENCIES - $99,000) 16 (C) REFURBISH APPROXIMATELY 3,000 FEET OF 17 TRACK AND INSTALL AND REHABILITATE 18 TURNOUT AT FORMER NANTICOKE YARD TO 19 HANDLE TRANSFER OF BULK COMMODITIES 990,000 20 (BASE PROJECT ALLOCATION - $900,000) 21 (DESIGN AND CONTINGENCIES - $90,000) 22 (D) REHABILITATE AND CONSTRUCT FACILITY 23 VILLAGE INTERMODAL FACILITY AT AVOCA 24 FOR TRANSLOADING VARIOUS CONSUMER 25 COMMODITIES AT A FORMER BROWNFIELD 26 INDUSTRIAL SITE 2,200,000 27 (BASE PROJECT ALLOCATION - $2,000,000) 28 (DESIGN AND CONTINGENCIES - $200,000) 29 (E) REBUILD APPROXIMATELY 5,000 FEET OF 30 TRACK INFRASTRUCTURE AT OLD HONEY POT 19990H1023B3629 - 34 -
1 YARD AT NANTICOKE SITUATE IN NEWPORT 2 TOWNSHIP FOR THE LOCATION OF A BULK 3 TRANSFER FACILITY 633,000 4 (BASE PROJECT ALLOCATION - $575,000) 5 (DESIGN AND CONTINGENCIES - $58,000) 6 (7) NORTH SHORE RAILROAD 7 (I) NORTHUMBERLAND COUNTY 8 (A) CONSTRUCT NEW INTERCHANGE TRACK WITH 9 SEDA-COG SYSTEM OF NORTH SHORE RAILROAD 10 AND DELAWARE AND HUDSON TO HANDLE NEW 11 CUSTOMER TRAFFIC DEMANDS 1,595,000 12 (BASE PROJECT ALLOCATION - $1,450,000) 13 (DESIGN AND CONTINGENCIES - $145,000) 14 (8) TAYLOR INTERMODAL 15 (I) LACKAWANNA COUNTY 16 (A) REHABILITATION OF RAIL INFRASTRUCTURE 17 AT THE TAYLOR INTERMODAL FACILITY OF 18 NORTHEAST FREIGHT TRANSFER TO INCREASE 19 CAPACITY AND IMPROVE CUSTOMER SERVICE 1,076,000 20 (BASE PROJECT ALLOCATION - $979,000) 21 (DESIGN AND CONTINGENCIES - $97,000) 22 (9) PENN EASTERN RAIL LINES, INC. 23 (I) CONSTRUCTION OF A NEW SIDING AT SINKING 24 SPRING TO INCREASE THE SAFETY AND 25 EFFICIENCY OF THE INTERCHANGE BETWEEN PENN 26 EASTERN RAIL LINES, INC., AND NORFOLK 27 SOUTHERN 231,000 28 (10) NOVOLOG, INC. 29 (I) BUCKS COUNTY 30 (A) RAIL REHABILITATION PROJECT 1,000,000 19990H1023B3629 - 35 -
1 (11) R.J. CORMAN RAILROAD COMPANY 2 (I) REHABILITATION OF THE RAIL LINE KNOWN AS 3 THE CLEARFIELD CLUSTER, LOCATED IN CAMBRIA, 4 CLEARFIELD, CENTRE, INDIANA AND JEFFERSON 5 COUNTIES 2,000,000 6 (C) AIR TRANSPORTATION.--ADDITIONAL CAPITAL PROJECTS IN THE 7 CATEGORY OF TRANSPORTATION ASSISTANCE PROJECTS FOR AIR 8 TRANSPORTATION SERVICE TO WHICH AN INTEREST IS TO BE ACQUIRED BY 9 THE DEPARTMENT OF TRANSPORTATION, ITS SUCCESSORS OR ASSIGNS, AND 10 TO BE FINANCED BY THE INCURRING OF DEBT ARE HEREBY ITEMIZED, 11 TOGETHER WITH THEIR RESPECTIVE ESTIMATED FINANCIAL COSTS, AS 12 FOLLOWS: 13 TOTAL 14 PROJECT 15 PROJECT ALLOCATION 16 (1) BEDFORD COUNTY 17 (I) BEDFORD COUNTY AIR INDUSTRIAL PARK 18 AUTHORITY 19 (A) CONSTRUCTION OF A CORPORATE HANGAR 375,000 20 (2) CARBON COUNTY 21 (I) CARBON COUNTY AIRPORT, CONSTRUCTION OF TWO 22 10-UNIT T HANGARS AND ASSOCIATED SITE 23 IMPROVEMENTS AND TAXIWAY IMPROVEMENTS 611,000 24 (3) CRAWFORD COUNTY 25 (I) PORT MEADVILLE AIRPORT 26 (A) CONSTRUCTION OF SIX SINGLE AIRCRAFT 27 HANGARS 275,000 28 (4) DAUPHIN COUNTY 29 (I) HARRISBURG INTERNATIONAL AIRPORT 30 (A) ENHANCEMENT TO EXISTING AIRPORT 19990H1023B3629 - 36 -
1 TERMINAL FACILITIES AND CONSTRUCTION OF 2 NEW TERMINAL AREA IMPROVEMENTS 7,000,000 3 (5) ERIE COUNTY 4 (I) ERIE MUNICIPAL AIRPORT 5 (A) LAND ACQUISITION AND SAFETY 6 IMPROVEMENTS FOR RUNWAY 6-24 5,000,000 7 (B) RAMP IMPROVEMENTS FOR TERMINAL, PHASE 8 II 4,000,000 9 (C) RELOCATE OR EXTEND RUNWAY 6-24 22,500,000 10 (6) YORK COUNTY 11 (I) AIR TRANSPORTATION AUTHORITY OF YORK 12 COUNTY, REPLACEMENT OF HANGARS AT YORK 13 AIRPORT 565,000 14 (II) CAPITAL CITY AIRPORT 15 (A) REHABILITATION OF EXISTING AVIATION 16 FACILITIES AND CONSTRUCTION OF NEW 17 HANGARS 500,000 18 SECTION 7. ITEMIZATION OF REDEVELOPMENT ASSISTANCE PROJECTS. 19 ADDITIONAL CAPITAL PROJECTS IN THE CATEGORY OF REDEVELOPMENT 20 ASSISTANCE PROJECTS FOR CAPITAL GRANTS BY THE DEPARTMENT OF 21 COMMUNITY AND ECONOMIC DEVELOPMENT, ITS SUCCESSORS OR ASSIGNS, 22 AUTHORIZED UNDER THE PROVISIONS OF THE ACT OF MAY 20, 1949 23 (P.L.1633, NO.493), KNOWN AS THE HOUSING AND REDEVELOPMENT 24 ASSISTANCE LAW, AND REDEVELOPMENT ASSISTANCE CAPITAL PROJECTS 25 AND TO BE FINANCED BY THE INCURRING OF DEBT, ARE HEREBY 26 ITEMIZED, TOGETHER WITH THEIR ESTIMATED FINANCIAL COSTS, AS 27 FOLLOWS: 28 TOTAL 29 PROJECT 30 PROJECT ALLOCATION 19990H1023B3629 - 37 -
1 (1) ADAMS COUNTY (RESERVED) 2 (2) ALLEGHENY COUNTY 3 (I) CITY OF PITTSBURGH 4 (A) CONSTRUCTION AND DEVELOPMENT OF THE 5 UPMC PITTSBURGH CANCER RESEARCH CLINIC 1,500,000 6 (II) COUNTY PROJECTS 7 (A) PITTSBURGH INTERNATIONAL AIRPORT 8 MAINTENANCE COMPLEX, DEVELOPMENT OF 9 STATE-OF-THE-ART MAINTENANCE AND 10 TRAINING COMPLEX FOR THE NEW FLEET OF 11 US AIRWAYS PLANES. THIS PROJECT SHALL 12 BE CONSTRUED AS AN ADDITION TO THE 13 PROJECT AUTHORIZED IN SECTION 14 6(2)(XII)(L) OF THE ACT OF JUNE 25, 15 1999 (P.L.237, NO.35), KNOWN AS THE 16 CAPITAL BUDGET PROJECT ITEMIZATION ACT 17 FOR 1999-2000 50,000,000 18 (B) RENOVATION AND EXPANSION OF MAIN 19 CAMPUS BUILDING OF AUBERLE SCHOOL 1,050,000 20 (C) RENOVATION, RESTORATION AND FACILITY 21 ENHANCEMENT OF POINT PARK COLLEGE 10,000,000 22 (D) ACQUISITION, DEMOLITION AND SITE 23 PREPARATION OF PROPERTY WEST OF 24 DUQUESNE INCLINE'S LOWER STATION FOR 25 CONSTRUCTION OF SOUTH SHORE RESTAURANT 26 AND PARKING FACILITY 5,500,000 27 (E) CONSTRUCTION OF A NEW FACILITY TO 28 HOUSE REGIONAL EDUCATIONAL PROGRAMS FOR 29 CREATIVE AND PERFORMING ARTS 10,000,000 30 (F) HEINZ HISTORY CENTER 150,000 19990H1023B3629 - 38 -
1 (III) ALLEGHENY COUNTY SANITARY AUTHORITY 2 (A) THREE RIVERS WET WEATHER DEMONSTRATION 3 PROJECT 26,300,000 4 (B) NINE MILE RUN HABITAT RESTORATION 5 PROJECT 2,700,000 6 (IV) WEST HOMESTEAD BOROUGH 7 (A) CONSTRUCTION OF A NEW MUNICIPAL 8 BUILDING TO BE LOCATED AT THE CORNER OF 9 EIGHTH AND FOREST AVENUES 400,000 10 (V) CARNEGIE BOROUGH 11 (A) CARNEGIE DOWNTOWN REVITALIZATION 650,000 12 (VI) SOUTH PARK TOWNSHIP 13 (A) PARK IMPROVEMENTS 500,000 14 (3) ARMSTRONG COUNTY 15 (I) COUNTY PROJECTS 16 (A) REHABILITATION OF THE FORD CITY 17 INDUSTRIAL HERITAGE MUSEUM 4,000,000 18 (4) BEAVER COUNTY 19 (I) COUNTY PROJECTS 20 (A) DEVELOPMENT AND CONSTRUCTION OF THE 21 CENTER FOR THE ARTS, IN ASSOCIATION 22 WITH GENEVA COLLEGE 8,000,000 23 (B) RENOVATION OF THE FORMER FARMERS 24 SAVING AND LOAN BUILDING FOR USE BY THE 25 BEAVER COUNTY INDUSTRIAL HERITAGE 26 MUSEUM 1,500,000 27 (C) ACQUISITION AND DEVELOPMENT OF 28 PROPERTY ALONG ROUTE 65 IN PORT 29 AMBRIDGE FOR USE AS AN INDUSTRIAL PARK 2,500,000 30 (D) ACQUISITION, DEVELOPMENT AND 19990H1023B3629 - 39 -
1 CONSTRUCTION OF THE AMBRIDGE REGIONAL 2 INDUSTRIAL RE-USE CENTER ALONG DUSS 3 AVENUE IN HARMONY TOWNSHIP AND AMBRIDGE 4 BOROUGH 1,200,000 5 (E) ACQUISITION, DEVELOPMENT AND 6 CONSTRUCTION OF A MULTITENANT BUSINESS 7 INCUBATOR IN ASSOCIATION WITH THE 8 CORPORATION FOR OWNER-OPERATOR 9 PROJECTS 2,750,000 10 (5) BEDFORD COUNTY 11 (I) BOROUGH OF HOLLIDAYSBURG 12 (A) HOLLIDAYSBURG COMMUNITY PARTNERSHIP - 13 CONSTRUCTION OF SLINKY MUSEUM AND 14 PARKING GARAGE 2,450,000 15 (6) BERKS COUNTY 16 (I) COUNTY PROJECTS 17 (A) REPLACEMENT OF FELIX DAM 3,900,000 18 (7) BLAIR COUNTY 19 (I) COUNTY PROJECTS 20 (A) ALLEGHENY COLLEGE - EVERETT CAMPUS, 21 CONSTRUCTION OF ADDITIONAL CLASSROOMS 22 AND PURCHASE OF EQUIPMENT 600,000 23 (8) BRADFORD COUNTY (RESERVED) 24 (9) BUCKS COUNTY 25 (I) BRISTOL TOWNSHIP 26 (A) DEVELOPMENT AND CONSTRUCTION OF A 27 MULTIPURPOSE STADIUM AND SPORTS 28 FACILITY 10,500,000 29 (B) RENOVATIONS TO MUNICIPAL BUILDING 2,400,000 30 (10) BUTLER COUNTY 19990H1023B3629 - 40 -
1 (I) COUNTY PROJECTS 2 (A) PITTSBURGH METAL PURIFYING, 3 ACQUISITION, REHABILITATION AND 4 RENOVATION OF AN 88,000 SQUARE FOOT 5 INDUSTRIAL BUILDING 3,500,000 6 (B) ALAMEDA PARK - EROSION AND 7 SEDIMENTATION CONTROL AND RELOCATION OF 8 A PORTION OF SULLIVAN RUN 88,000 9 (C) ALAMEDA PARK - CONSTRUCTION OF A NEW 10 PARK OFFICE, LODGE, MAINTENANCE 11 FACILITY, AND ROADS AND PARKING 12 FACILITIES, RESTROOMS AND AN ALL-SEASON 13 DOME FOR AN EXISTING SWIMMING POOL 850,000 14 (11) CAMBRIA COUNTY (RESERVED) 15 (12) CAMERON COUNTY (RESERVED) 16 (13) CARBON COUNTY (RESERVED) 17 (14) CENTRE COUNTY 18 (I) COUNTY PROJECTS 19 (A) CONSTRUCTION OF THE SHANER SPORTS 20 COMPLEX 2,000,000 21 (15) CHESTER COUNTY 22 (I) COUNTY PROJECTS 23 (A) CONSTRUCTION OF A REGIONAL/COMMUNITY 24 MUSIC AND PERFORMING ARTS FACILITY 25 INCLUDING INSTRUCTIONAL, CLASSROOM AND 26 REHEARSAL FACILITIES FOR THE USE BY THE 27 WEST CHESTER UNIVERSITY OF 28 PENNSYLVANIA 12,000,000 29 (B) CONSTRUCTION OF A REGIONAL 30 CONFERENCE/CONVENTION AND COMMUNITY 19990H1023B3629 - 41 -
1 CENTER IN CONJUNCTION WITH WEST CHESTER 2 UNIVERSITY FOR THE PURPOSE OF PROVIDING 3 A STATE-OF-THE-ART FACILITY FOR 4 REGIONAL, COMMUNITY AND UNIVERSITY 5 EVENTS 10,000,000 6 (C) PHOENIXVILLE AREA YMCA PROGRAM CENTER 7 - LAND ACQUISITION AND CONSTRUCTION OF 8 A FAMILY WELLNESS CENTER, INCLUDING AN 9 ALL-PURPOSE ACTIVITY ROOM TEEN AND 10 SENIOR CENTERS, MAINTENANCE SHOP, 11 BALLFIELD AND PARKING 950,000 12 (II) TREDYFFRIN TOWNSHIP 13 (A) CONSTRUCTION OF THE PAOLI INTERMODAL 14 TRANSPORTATION FACILITY AT THE PAOLI 15 RAILYARD SITUATE IN TREDYFFRIN TOWNSHIP 16 AND WILLISTOWN TOWNSHIP 8,000,000 17 (16) CLARION COUNTY 18 (I) COUNTY PROJECTS 19 (A) BEAVER CREEK DAM CONSTRUCTION, 20 INCLUDING CONSTRUCTION OF A TREATMENT 21 PLANT AND NEW WATER LINES 5,150,000 22 (B) DEVELOPMENT OF THE BEAVER TOWNSHIP 23 INDUSTRIAL PARK, INCLUDING LAND 24 ACQUISITION, PUBLIC WATER AND SEWER 25 INFRASTRUCTURE AND THE CONSTRUCTION OF 26 AN ACCESS ROAD 642,000 27 (C) CONSTRUCTION OF THE ALLEGHENY-CLARION 28 VALLEY COMMUNITY CENTER 604,000 29 (17) CLEARFIELD COUNTY 30 (I) NORTH CENTRAL PENNSYLVANIA REGIONAL 19990H1023B3629 - 42 -
1 PLANNING AND DEVELOPMENT COMMISSION 2 (A) ACQUISITION AND CONSTRUCTION OF AN 3 EDUCATION, WORK FORCE DEVELOPMENT AND 4 TECHNOLOGY CENTER 4,000,000 5 (18) CLINTON COUNTY 6 (I) COUNTY PROJECTS 7 (A) ACQUISITION, CONSTRUCTION AND 8 RENOVATION OF KEYSTONE CENTRAL SCHOOL 9 DISTRICT PROPERTIES FOR EDUCATIONAL AND 10 COMMUNITY PURPOSES IN ASSOCIATION WITH 11 LOCK HAVEN UNIVERSITY OF PENNSYLVANIA 3,400,000 12 (19) COLUMBIA COUNTY (RESERVED) 13 (20) CRAWFORD COUNTY 14 (I) COUNTY PROJECTS 15 (A) CONSTRUCTION OF A COMMUNITY USE ALL- 16 WEATHER TRACK FACILITY IN CONJUNCTION 17 WITH ALLEGHENY COLLEGE 500,000 18 (II) CITY OF MEADVILLE 19 (A) CONSTRUCTION OF A DOWNTOWN MEADVILLE 20 PARKING GARAGE, INCLUDING THE 21 DEMOLITION OF AN EXISTING BUILDING 2,000,000 22 (21) CUMBERLAND COUNTY 23 (I) COUNTY PROJECTS 24 (A) CONSTRUCTION OF A REGIONAL PERFORMING 25 AND INSTRUCTIONAL ARTS FACILITY IN 26 CONJUNCTION WITH THE SHIPPENSBURG 27 UNIVERSITY FOUNDATION AND SHIPPENSBURG 28 UNIVERSITY OF PENNSYLVANIA FOR 29 COMMUNITY AND UNIVERSITY USE 10,000,000 30 (22) DAUPHIN COUNTY 19990H1023B3629 - 43 -
1 (I) CITY OF HARRISBURG 2 (A) PURCHASE AND RENOVATION OF A 3 BROWNFIELD SITE IN THE CAMERON STREET 4 CORRIDOR FOR DEVELOPMENT OF A 5 MULTITENANT INDUSTRIAL FACILITY 5,000,000 6 (II) COUNTY PROJECTS 7 (A) HARRISBURG INTERNATIONAL AIRPORT - 8 ENVIRONMENTAL REMEDIATION AND 9 DEMOLITION OF EXISTING STRUCTURES AND 10 CONSTRUCTION OF NEW INFRASTRUCTURE FOR 11 CARGO FACILITIES 5,500,000 12 (B) IMPROVEMENTS AND RENOVATIONS TO 13 VARIOUS DAUPHIN COUNTY LIBRARY SYSTEM 14 FACILITIES, INCLUDING ADDITIONAL 15 PARKING CAPACITY, ROOF REPLACEMENTS, 16 HVAC REPLACEMENTS, LIGHTING UPGRADES, 17 REPOINTING, STRUCTURAL RESTORATION OF 18 EAVES, CONSTRUCTION OF NEW FACILITIES 19 AND ACQUISITION OF FURNISHINGS AND 20 EQUIPMENT 2,650,000 21 (III) DERRY TOWNSHIP 22 (A) DESIGN AND CONSTRUCTION OF 25,000 23 SQUARE FEET OF INTERACTIVE EXHIBITS FOR 24 A NEW HERSHEY MUSEUM 6,126,000 25 (23) DELAWARE COUNTY 26 (I) COUNTY PROJECTS 27 (A) LAND ACQUISITION, DEVELOPMENT AND 28 CONSTRUCTION OF A PROFESSIONAL SPORTS 29 ORGANIZATION HEADQUARTERS, TRAINING AND 30 PRACTICE FACILITY 15,000,000 19990H1023B3629 - 44 -
1 (24) ELK COUNTY 2 (I) NORTH CENTRAL PENNSYLVANIA REGIONAL 3 PLANNING AND DEVELOPMENT COMMISSION 4 (A) ACQUISITION, REHABILITATION AND 5 DEMOLITION OF KOZ INDUSTRIAL PROPERTIES 6 IN CAMERON, CLEARFIELD, ELK, JEFFERSON, 7 MCKEAN AND POTTER COUNTIES 6,000,000 8 (25) ERIE COUNTY 9 (I) COUNTY PROJECTS 10 (A) ACQUISITION OF PROPERTY ADJACENT TO 11 ERIE MUNICIPAL AIRPORT FOR MULTI-MODAL 12 FREIGHT DEVELOPMENT 1,000,000 13 (B) SITE IMPROVEMENTS TO THE WATSON-CURTZE 14 MANSION, INCLUDING LAND ACQUISITION AND 15 PARKING IMPROVEMENTS 500,000 16 (C) ERIE-WESTERN PA PORT AUTHORITY, 17 DEVELOPMENT OF A CRUISE/FERRYBOAT 18 TERMINAL AND REPAIRS TO THE GRAIN 19 ELEVATOR SLIP 6,000,000 20 (D) ERIE ART MUSEUM AND ERIE COUNTY 21 HISTORICAL SOCIETY AT DISCOVERY SQUARE, 22 COMPLETION OF PHASE II OF MUSEUM 23 COMPLEX, INCLUDING LAND ACQUISITION 25,000,000 24 (II) CITY OF ERIE 25 (A) DEVELOPMENT OF ERIE BAYFRONT 26 CONVENTION CENTER. THIS PROJECT SHALL 27 BE CONSTRUED AS AN ADDITION TO THE 28 PROJECT AUTHORIZED IN SECTION 29 6(23)(VIII)(A) OF THE ACT OF JUNE 25, 30 1999 (P.L.237, NO.35), KNOWN AS THE 19990H1023B3629 - 45 -
1 CAPITAL BUDGET PROJECT ITEMIZATION ACT 2 FOR 1999-2000 12,000,000 3 (B) RENOVATION AND RETROFIT OF CITY HALL 1,250,000 4 (C) DEVELOPMENT OF A SINGLE COMPLEX OF 5 OPERATIONS FOR THE CITY PUBLIC WORKS 6 DEPARTMENT AND BUREAU OF PARKS, 7 INCLUDING LAND ACQUISITION 1,800,000 8 (D) CONSTRUCTION OF A PUBLIC SAFETY AND 9 COMMUNICATIONS FACILITY 9,000,000 10 (E) REPAIR, RESTORATION AND PRESERVATION 11 OF HISTORIC BUILDINGS INCLUDING THE 12 DICKSON TAVERN, THE FIREFIGHTERS 13 HISTORICAL MUSEUM AND THE ERIE LAND 14 LIGHTHOUSE 550,000 15 (F) IMPROVEMENTS AND FACILITY RENOVATIONS 16 FOR THE CITY-OWNED ERIE GOLF COURSE, J. 17 C. MARTIN GOLF COURSE AND THE DOWNING 18 GOLF COURSE 2,700,000 19 (G) LAND ACQUISITION AND ENVIRONMENTAL 20 REMEDIATION OF A 25-ACRE BROWNFIELD 21 SITE FOR THE DEVELOPMENT OF THE EAST 22 12TH STREET INDUSTRIAL PARK AND THE 23 CONSTRUCTION OF A MULTITENANT BUILDING 3,000,000 24 (H) ERIE ZOO EXPANSION - INCLUDING THE 25 DEVELOPMENT OF PARKING, REPAIR, 26 MAINTENANCE AND STORAGE FACILITIES, 27 INDOOR AND OUTDOOR EXHIBIT SPACE, 28 BOTANICAL AND HISTORICAL GARDENS, AND 29 LAND ACQUISITION AND THE RENOVATION OF 30 THE MARSH STREET BUILDINGS 5,000,000 19990H1023B3629 - 46 -
1 (I) LAND ACQUISITION, REHABILITATION AND 2 ENVIRONMENTAL REMEDIATION FOR VARIOUS 3 KOZ BROWNFIELD SITES IN THE CITY OF 4 ERIE FOR REUSE AS INDUSTRIAL PARKS 1,900,000 5 (26) FAYETTE COUNTY (RESERVED) 6 (27) FOREST COUNTY (RESERVED) 7 (28) FRANKLIN COUNTY (RESERVED) 8 (29) FULTON COUNTY (RESERVED) 9 (30) GREENE COUNTY 10 (I) COUNTY PROJECTS 11 (A) CONSTRUCTION, RENOVATION AND SITE 12 IMPROVEMENTS AT WAYNESBURG COLLEGE 2,300,000 13 (31) HUNTINGTON COUNTY (RESERVED) 14 (32) INDIANA COUNTY (RESERVED) 15 (33) JEFFERSON COUNTY (RESERVED) 16 (34) JUNIATA COUNTY (RESERVED) 17 (35) LACKAWANNA COUNTY 18 (I) COUNTY PROJECTS 19 (A) CONSTRUCTION OF A GREAT VALLEY 20 INFORMATION TECHNOLOGY INSTITUTE AND 21 INCUBATOR AT THE WILKES-BARRE/SCRANTON 22 INTERNATIONAL AIRPORT CAMPUS 9,000,000 23 (36) LANCASTER COUNTY 24 (I) ELIZABETHTOWN BOROUGH 25 (A) RENOVATION, RESTORATION AND HISTORIC 26 PRESERVATION OF THE ELIZABETHTOWN TRAIN 27 STATION AND INTERMODAL TRANSPORTATION 28 CENTER 1,200,000 29 (37) LAWRENCE COUNTY 30 (I) COUNTY PROJECTS 19990H1023B3629 - 47 -
1 (A) RIVERVIEW COMMERCE PARK, PHASE III - 2 FINAL PHASE DEVELOPMENT INCLUDING LAND 3 ACQUISITION, DEMOLITION, SITE 4 IMPROVEMENTS AND REHABILITATION OF 5 EXISTING STRUCTURES 1,500,000 6 (B) MILLENNIUM COMMERCE PARK - LAND 7 ACQUISITION, INFRASTRUCTURE 8 IMPROVEMENTS, SITE IMPROVEMENTS AND 9 CONSTRUCTION OF AN ACCESS ROAD AND 10 STORM WATER MANAGEMENT SYSTEMS 1,000,000 11 (38) LEBANON COUNTY (RESERVED) 12 (39) LEHIGH COUNTY (RESERVED) 13 (40) LUZERNE COUNTY 14 (I) LEHMAN TOWNSHIP 15 (A) CONSTRUCTION OF AN INDOOR/OUTDOOR BACK 16 MOUNTAIN RECREATION COMPLEX, INCLUDING 17 LAND ACQUISITION AND INFRASTRUCTURE 18 IMPROVEMENTS 7,500,000 19 (II) WILKES-BARRE CITY 20 (A) CONSTRUCTION AND RENOVATION OF A 21 MULTIPURPOSE SUSQUEHANNA RIVER THEME 22 TECHNOLOGY, HERITAGE AND TOURISM CENTER 23 AND SUPPORTING INFRASTRUCTURE AND 24 PARKING FACILITIES 30,000,000 25 (41) LYCOMING COUNTY (RESERVED) 26 (42) MCKEAN COUNTY (RESERVED) 27 (43) MERCER COUNTY 28 (I) COUNTY PROJECTS 29 (A) RENOVATION AND REHABILITATION OF THE 30 MERCER COUNTY COURTHOUSE 3,365,000 19990H1023B3629 - 48 -
1 (II) CITY OF HERMITAGE 2 (A) DEVELOPMENT AND CONSTRUCTION OF A 3 PLANNED TECHNICAL PARK FOR BUSINESS AND 4 INDUSTRIAL RE-USE AND FOR RECREATIONAL 5 PURPOSES 2,500,000 6 (44) MIFFLIN COUNTY 7 (I) DOWNTOWN LEWISTOWN, INC. 8 (A) DEVELOPMENT AND REDEVELOPMENT RELATED 9 TO THE "MASTER PLAN FOR DOWNTOWN 10 LEWISTOWN" AND THE "NEW VISION FOR THE 11 LEWISTOWN COMMUNITY" 5,000,000 12 (45) MONROE COUNTY (RESERVED) 13 (46) MONTGOMERY COUNTY 14 (I) COUNTY PROJECTS 15 (A) REHABILITATION, RETROFIT AND 16 RECONSTRUCTION OF ST. GABRIEL'S HALL, 17 AND THE CHAPEL/GYM AND COTTAGE 5,000,000 18 (B) PHOENIXVILLE AREA YMCA, SPRING VALLEY 19 PROGRAM CENTER - DEVELOPMENT AND 20 CONSTRUCTION OF A 60,000-SQUARE-FOOT 21 PROGRAM CENTER, INCLUDING LAND 22 ACQUISITION 3,000,000 23 (C) PHOENIXVILLE AREA YMCA, AUDUBON 24 PROGRAM CENTER - DEVELOPMENT AND 25 CONSTRUCTION OF A PROGRAM CENTER, POOL 26 AND LOCKER ROOMS AND RENOVATION OF 27 EXISTING FACILITIES FOR COMMUNITY USE 1,375,000 28 (II) NORRISTOWN BOROUGH 29 (A) CONSTRUCTION OF A NEW FIREHOUSE FOR 30 THE HANCOCK VOLUNTEER FIRE COMPANY 250,000 19990H1023B3629 - 49 -
1 (47) MONTOUR COUNTY (RESERVED) 2 (48) NORTHAMPTON COUNTY (RESERVED) 3 (49) NORTHUMBERLAND COUNTY (RESERVED) 4 (50) PERRY COUNTY (RESERVED) 5 (51) PHILADELPHIA COUNTY 6 (I) CITY PROJECTS 7 (A) CONSTRUCTION OF A RESIDENT ACTIVITY 8 CENTER AS AN ADDITION TO WHITEHALL 9 COMMONS IN THE FRANKFORD SECTION OF THE 10 CITY LOCATED AT WAKELING AND DITMAN 11 STREETS 1,000,000 12 (B) RENOVATIONS TO THE TERRA BUILDING OF 13 THE UNIVERSITY OF THE ARTS AT BROAD AND 14 WALNUT STREETS, INCLUDING RESTORATION 15 OF THE FACADE 3,200,000 16 (C) REHABILITATION OF EASTERN PENITENTIARY 17 AT CORINTHIAN AND FAIRMOUNT AVENUES. 18 THIS PROJECT SHALL BE CONSTRUED AS AN 19 ADDITION TO THE PROJECT AUTHORIZED IN 20 SECTION 6(44)(I)(CC) OF THE ACT OF JUNE 21 25, 1999 (P.L.237, NO.35), KNOWN AS THE 22 CAPITAL BUDGET PROJECT ITEMIZATION ACT 23 FOR 1999-2000 1,000,000 24 (D) CONSTRUCTION, RENOVATION AND SITE 25 IMPROVEMENTS FOR A MULTIPURPOSE 26 COMMUNITY CENTER OPERATED BY THE GIVING 27 OF SELF PARTNERSHIP, INC., IN THE WEST 28 OAK LANE AREA 250,000 29 (E) PRINCE MUSIC THEATER, RENOVATION OF 30 FACILITY INCLUDING RECONSTRUCTION AND 19990H1023B3629 - 50 -
1 FIT-OUT OF SECOND AND THIRD FLOORS FOR 2 EDUCATIONAL, TRAINING AND PERFORMANCE 3 FACILITIES; COMPLETION OF BACKSTAGE 4 AREAS ON LOWER LEVEL; AND PURCHASE AND 5 INSTALLATION OF A STATE-OF-THE-ART 6 TELECOMMUNICATIONS SYSTEM 2,500,000 7 (F) JFK PLAZA, CONSTRUCTION OF RESTAURANT 8 AND STAIRWAY STRUCTURE IN COMMERCE 9 SQUARE 3,500,000 10 (G) LOGAN SQUARE, CONSTRUCTION OF A 11 PARKING GARAGE 21,000,000 12 (H) LOGAN SQUARE, IMPROVEMENTS TO PARK 13 BUILDINGS, INCLUDING PAVILIONS, TO 14 SERVE AS ART EXHIBITS AND DINING AND 15 INFORMATION CENTERS 13,000,000 16 (I) PENNSYLVANIA AVENUE, CONSTRUCTION OF 17 PARKING FACILITIES 3,500,000 18 (J) CALDER FOUNDATION MUSEUM, CONSTRUCTION 19 OF MUSEUM TO BE LOCATED ON THE BENJAMIN 20 FRANKLIN PARKWAY 6,000,000 21 (K) MOORE COLLEGE OF ART AND DESIGN. FOR 22 THE PURCHASE OF, RENOVATIONS TO AND 23 FURNITURE AND FIXTURES FOR 1916 RACE 24 STREET, 1920 RACE STREET AND 2039 25 CHERRY STREET IN PHILADELPHIA 12,500,000 26 (L) BUILDING PURCHASE AND RENOVATIONS TO 27 THE PHILADELPHIA VETERANS MULTI-SERVICE 28 AND EDUCATION CENTER ON NORTH FOURTH 29 STREET 500,000 30 (M) SPRUCE HILL COMMUNITY ASSOCIATION, 19990H1023B3629 - 51 -
1 BUILDING CONSTRUCTION AND RENOVATIONS 500,000 2 (N) 60TH STREET BUSINESS ASSOCIATION, 3 BUILDING CONSTRUCTION AND RENOVATIONS 500,000 4 (O) WOODLAND AVENUE BUSINESS ASSOCIATION, 5 BUILDING CONSTRUCTION AND RENOVATIONS 500,000 6 (P) BALTIMORE AVENUE BUSINESS ASSOCIATION, 7 BUILDING CONSTRUCTION AND RENOVATIONS 500,000 8 (Q) 52ND STREET BUSINESS ASSOCIATION, 9 BUILDING CONSTRUCTION AND RENOVATIONS 500,000 10 (R) UNIVERSAL COMMERCIAL CENTER ON AVENUE 11 OF THE ARTS, BUILDING CONSTRUCTION AND 12 RENOVATIONS 13,000,000 13 (S) ADDITIONAL FUNDS FOR THE CENTER FOR 14 HUMAN ADVANCEMENT PROJECT 3,000,000 15 (T) UNIVERSITY OF PENNSYLVANIA SCHOOL OF 16 VETERINARY MEDICINE, CONSTRUCTION OF A 17 NEW TEACHING AND RESEARCH BUILDING TO 18 BE LOCATED AT THE UNIVERSITY'S MAIN 19 CAMPUS 18,000,000 20 (52) PIKE COUNTY 21 (I) MILFORD BOROUGH 22 (A) STREETSCAPE IMPROVEMENT PROJECT 1,053,000 23 (53) POTTER COUNTY 24 (I) NORTH CENTRAL PENNSYLVANIA REGIONAL 25 PLANNING AND DEVELOPMENT COMMISSION 26 (A) ACQUISITION AND DEVELOPMENT OF 27 PROPERTIES FOR A TELECOMMUNICATIONS 28 CENTER AND ANCILLARY SUPPORT IN POTTER 29 COUNTY 30,000,000 30 (54) SCHUYLKILL COUNTY (RESERVED) 19990H1023B3629 - 52 -
1 (55) SNYDER COUNTY (RESERVED) 2 (56) SOMERSET COUNTY 3 (I) BOROUGH OF WINDBER 4 (A) WINDBER INDUSTRIAL PARK, 5 INFRASTRUCTURE 1,000,000 6 (57) SULLIVAN COUNTY (RESERVED) 7 (58) SUSQUEHANNA COUNTY (RESERVED) 8 (59) TIOGA COUNTY (RESERVED) 9 (60) UNION COUNTY (RESERVED) 10 (61) VENANGO COUNTY 11 (I) COUNTY PROJECTS 12 (A) CONVERSION OF THE DEPARTMENT OF 13 TRANSPORTATION DISTRICT 1-0 14 HEADQUARTERS (GALENA BUILDING) FOR 15 COMMERCIAL/RESIDENTIAL USE 1,600,000 16 (62) WARREN COUNTY (RESERVED) 17 (63) WASHINGTON COUNTY (RESERVED) 18 (64) WAYNE COUNTY (RESERVED) 19 (65) WESTMORELAND COUNTY (RESERVED) 20 (66) WYOMING COUNTY (RESERVED) 21 (67) YORK COUNTY 22 (I) COUNTY PROJECTS 23 (A) LEG UP FARM INC. - CONSTRUCTION OF A 24 THERAPEUTIC HORSE STABLE 4,560,000 25 (B) CENTRAL MARKET HOUSE - INTERIOR 26 RENOVATIONS 2,250,000 27 (C) CRISPUS ATTUCKS ASSOCIATION, 28 CONSTRUCTION OF A JOB TRAINING CENTER 300,000 29 SECTION 8. ITEMIZATION OF FLOOD CONTROL PROJECTS. 30 ADDITIONAL CAPITAL PROJECTS IN THE CATEGORY OF FLOOD CONTROL 19990H1023B3629 - 53 -
1 PROJECTS TO BE CONSTRUCTED BY THE DEPARTMENT OF ENVIRONMENTAL 2 PROTECTION, ITS SUCCESSORS OR ASSIGNS, AND TO BE FINANCED BY THE 3 INCURRING OF DEBT ARE HEREBY ITEMIZED, TOGETHER WITH THEIR 4 RESPECTIVE ESTIMATED COSTS, AS FOLLOWS: 5 TOTAL 6 PROJECT 7 PROJECT ALLOCATION 8 (1) DEPARTMENT OF ENVIRONMENTAL PROTECTION 9 (I) ERIE COUNTY 10 (A) CASCADE STREET STORM SEWER 11 REPLACEMENT, CITY OF ERIE 750,000 12 (II) LYCOMING COUNTY 13 (A) MCLURE'S RUN STREAM RESTORATION 14 PROJECT, INCLUDING CULVERT REPLACEMENT, 15 LOYALSOCK TOWNSHIP 117,000 16 (B) MUNCY CREEK STREAM RESTORATION 17 PROJECT, MUNCY CREEK TOWNSHIP 740,000 18 (C) HAGERMAN'S RUN FLOOD CONTROL PROJECT, 19 INCLUDING THE REHABILITATION AND 20 UPGRADE OF CONDUIT, SOUTH WILLIAMSPORT 21 BOROUGH 1,000,000 22 (D) INTEGRATED FLOOD FORECASTING SYSTEM - 23 URBAN AREA TOPOGRAPHY STUDY, INCLUDING 24 HYDROLOGIC STUDIES, STREAM AND RAIN 25 GAUGING AND FLOOD INUNDATION MAPPING 1,500,000 26 (E) LOWER LYCOMING CREEK FLOOD MITIGATION 1,800,000 27 (F) COUNTYWIDE FLOOD HAZARD MITIGATION 28 PROGRAM 500,000 29 (G) RALSTON FLOOD MITIGATION PROJECT, 30 VILLAGE OF RALSTON 300,000 19990H1023B3629 - 54 -
1 (III) SOMERSET COUNTY, BENSON BOROUGH FEDERAL 2 FLOOD CONTROL PROJECT 3 (A) ADDITIONAL FUNDS FOR THE BENSON 4 FEDERAL FLOOD CONTROL PROJECT 260,000 5 (BASE PROJECT ALLOCATION - $260,000) 6 (IV) SOMERSET COUNTY, HOOVERSVILLE BOROUGH 7 FEDERAL FLOOD CONTROL PROJECT 8 (A) ADDITIONAL FUNDS FOR THE HOOVERSVILLE 9 FEDERAL FLOOD CONTROL PROJECT 326,000 10 (BASE PROJECT ALLOCATION - $326,000) 11 (V) SULLIVAN COUNTY 12 (A) FLOOD CONTROL PROJECT TO PREVENT 13 RUNOFF FROM LOYALSOCK CREEK, DUSHORE 14 BOROUGH 566,000 15 SECTION 9. ITEMIZATION OF KEYSTONE RECREATION, PARK AND 16 CONSERVATION PROJECTS. 17 PROJECTS IN THE CATEGORY OF KEYSTONE RECREATION, PARK AND 18 CONSERVATION PROJECTS TO BE CONSTRUCTED BY THE DEPARTMENT OF 19 CONSERVATION AND NATURAL RESOURCES, ITS SUCCESSORS OR ASSIGNS, 20 AND TO BE FINANCED BY THE INCURRING OF DEBT AND/OR CURRENT 21 REVENUES, ARE HEREBY ITEMIZED, TOGETHER WITH THEIR RESPECTIVE 22 ESTIMATED COSTS, AS FOLLOWS: 23 TOTAL 24 PROJECT 25 PROJECT ALLOCATION 26 (1) DEPARTMENT OF CONSERVATION AND NATURAL 27 RESOURCES 28 (I) BALD EAGLE STATE PARK 29 (A) ROAD IMPROVEMENTS 1,406,000 30 (BASE PROJECT ALLOCATION - $1,406,000) 19990H1023B3629 - 55 -
1 (II) CANOE CREEK STATE PARK 2 (A) SEWER LINE EXTENSION 300,000 3 (BASE PROJECT ALLOCATION - $300,000) 4 (III) CODORUS STATE PARK 5 (A) RENOVATE PARK OFFICE 300,000 6 (BASE PROJECT ALLOCATION - $300,000) 7 (IV) COLONEL DENNING STATE PARK 8 (A) UPGRADE SEWER SYSTEM 350,000 9 (BASE PROJECT ALLOCATION - $350,000) 10 (B) RENOVATE WASHHOUSE AND RESTROOMS 600,000 11 (BASE PROJECT ALLOCATION - $600,000) 12 (V) COOK FOREST STATE PARK 13 (A) ROAD AND PARKING REHABILITATION 475,000 14 (BASE PROJECT ALLOCATION - $475,000) 15 (VI) FOREST DISTRICT 5 16 (A) RESURFACE LAUREL RUN ROAD 750,000 17 (BASE PROJECT ALLOCATION - $750,000) 18 (VII) FOREST DISTRICT 12 AND 16 19 (A) PINE CREEK RAIL/TRAIL IMPROVEMENTS 2,500,000 20 (BASE PROJECT ALLOCATION - $2,500,000) 21 (VIII) HICKORY RUN STATE PARK 22 (A) REPLACE PARK OFFICE 1,500,000 23 (BASE PROJECT ALLOCATION - $1,500,000) 24 (IX) KEYSTONE STATE PARK 25 (A) REHABILITATE WATER SYSTEM 490,000 26 (BASE PROJECT ALLOCATION - $490,000) 27 (B) REHABILITATE SEWER SYSTEM 350,000 28 (BASE PROJECT ALLOCATION - $350,000) 29 (X) LEONARD HARRISON STATE PARK 30 (A) REPLACE RESTROOMS 350,000 19990H1023B3629 - 56 -
1 (BASE PROJECT ALLOCATION - $350,000) 2 (B) REPLACE PIT LATRINES 400,000 3 (BASE PROJECT ALLOCATION - $400,000) 4 (XI) LITTLE PINE STATE PARK 5 (A) REPLACE PARK BRIDGE 354,000 6 (BASE PROJECT ALLOCATION - $354,000) 7 (XII) MORAINE STATE PARK 8 (A) MARINA PAVING 470,000 9 (BASE PROJECT ALLOCATION - $470,000) 10 (B) REHABILITATE MARINA PILINGS 350,000 11 (BASE PROJECT ALLOCATION - $350,000) 12 (C) REHABILITATE SEWAGE SYSTEM 600,000 13 (BASE PROJECT ALLOCATION - $600,000) 14 (XIII) NOCKAMIXON STATE PARK 15 (A) REPLACE TOILETS 400,000 16 (BASE PROJECT ALLOCATION - $400,000) 17 (XIV) OLE BULL STATE PARK 18 (A) REPLACE CAUSEWAY 450,000 19 (BASE PROJECT ALLOCATION - $450,000) 20 (XV) PENN ROOSEVELT STATE PARK 21 (A) RECONSTRUCT DAM 300,000 22 (BASE PROJECT ALLOCATION - $300,000) 23 (XVI) POE VALLEY STATE PARK 24 (A) MODERNIZATION OF CAMPGROUND AND 25 RESTROOM FACILITY 500,000 26 (BASE PROJECT ALLOCATION - $500,000) 27 (XVII) PRINCE GALLITZIN STATE PARK 28 (A) RENOVATION OF SEWAGE TREATMENT PLANT 500,000 29 (BASE PROJECT ALLOCATION - $500,000) 30 (XVIII) PROMISED LANDS STATE PARK 19990H1023B3629 - 57 -
1 (A) REHABILITATE SEWAGE COLLECTION SYSTEM 750,000 2 (BASE PROJECT ALLOCATION - $750,000) 3 (XIX) PYMATUNING STATE PARK 4 (A) BITUMINOUS PAVING 875,000 5 (BASE PROJECT ALLOCATION - $875,000) 6 (B) INSTALL SHORELINE EROSION PROTECTION 1,500,000 7 (BASE PROJECT ALLOCATION - $1,500,000) 8 (XX) RACCOON CREEK STATE PARK 9 (A) ROAD PAVING 450,000 10 (BASE PROJECT ALLOCATION - $450,000) 11 (XXI) REEDS GAP STATE PARK 12 (A) SWIMMING POOL REPLACEMENT 490,000 13 (BASE PROJECT ALLOCATION - $490,000) 14 (XXII) SHAWNEE STATE PARK 15 (A) REHABILITATE PARK OFFICE 1,000,000 16 (BASE PROJECT ALLOCATION - $1,000,000) 17 (B) REHABILITATE BATHHOUSE AND CONCESSION 400,000 18 (BASE PROJECT ALLOCATION - $400,000) 19 (XXIII) SHIKELLAMY STATE PARK 20 (A) REPLACE MARINA DOCKS 600,000 21 (BASE PROJECT ALLOCATION - $600,000) 22 (XXIV) SINNEMAHONING STATE PARK 23 (A) ROAD IMPROVEMENTS 300,000 24 (BASE PROJECT ALLOCATION - $300,000) 25 (XXV) SIZERVILLE STATE PARK 26 (A) WATER TREATMENT UPGRADES 300,000 27 (BASE PROJECT ALLOCATION - $300,000) 28 (XXVI) SUSQUEHANNOCK STATE FOREST 29 (A) LAND ACQUISITION 2,000,000 30 (LAND ALLOCATION - $2,000,000) 19990H1023B3629 - 58 -
1 (XXVII) YELLOW CREEK STATE PARK 2 (A) ROAD RESURFACING 460,000 3 (BASE PROJECT ALLOCATION - $460,000) 4 SECTION 10. ITEMIZATION OF ENVIRONMENTAL STEWARDSHIP FUND 5 PROJECTS. 6 PROJECTS IN THE CATEGORY OF ENVIRONMENTAL STEWARDSHIP FUND 7 PROJECTS TO BE CONSTRUCTED BY THE DEPARTMENT OF CONSERVATION AND 8 NATURAL RESOURCES, ITS SUCCESSORS OR ASSIGNS, AND TO BE FINANCED 9 BY CURRENT REVENUES, ARE HEREBY ITEMIZED TOGETHER WITH THEIR 10 RESPECTIVE ESTIMATED FINANCIAL COSTS AS FOLLOWS: 11 TOTAL 12 PROJECT 13 PROJECT ALLOCATION 14 (1) DEPARTMENT OF CONSERVATION AND NATURAL 15 RESOURCES 16 (I) BALD EAGLE STATE PARK 17 (A) REHABILITATE VISITOR CENTER AND 18 OFFICE 700,000 19 (BASE PROJECT ALLOCATION - $700,000) 20 (II) BLACK MOSHANNON STATE PARK 21 (A) UPGRADE WATER SYSTEMS AND FACILITIES 1,000,000 22 (BASE PROJECT ALLOCATION - $1,000,000) 23 (III) CHAPMAN STATE PARK 24 (A) UPGRADE LATRINES AND BATHHOUSES 1,170,000 25 (BASE PROJECT ALLOCATION - $1,170,000) 26 (IV) CLEAR CREEK STATE PARK 27 (A) REPLACE PIT LATRINES 2,300,000 28 (BASE PROJECT ALLOCATION - $2,300,000) 29 (V) CODORUS STATE PARK 30 (A) UPGRADE WATER AND SEWER SYSTEMS 600,000 19990H1023B3629 - 59 -
1 (BASE PROJECT ALLOCATION - $600,000) 2 (VI) COWANS GAP STATE PARK 3 (A) REHABILITATE CAMPING AREAS 2,100,000 4 (BASE PROJECT ALLOCATION - $2,100,000) 5 (B) REHABILITATE SEWAGE SYSTEM 550,000 6 (BASE PROJECT ALLOCATION - $550,000) 7 (VII) DELAWARE CANAL STATE PARK 8 (A) REBUILD YARDLEY AQUEDUCT 1,500,000 9 (BASE PROJECT ALLOCATION - $1,500,000) 10 (B) BRIDGE REPLACEMENT 1,000,000 11 (BASE PROJECT ALLOCATION - $1,000,000) 12 (VIII) DELAWARE CANAL STATE PARK 13 (A) RECONSTRUCT FISH LADDERS 600,000 14 (BASE PROJECT ALLOCATION - $600,000) 15 (IX) ELK STATE FOREST DISTRICT 13 16 (A) RENOVATE DISTRICT OFFICE 750,000 17 (BASE PROJECT ALLOCATION - $750,000) 18 (X) FORT WASHINGTON STATE PARK 19 (A) REPLACE PIT LATRINES AND SEWAGE 20 COLLECTION SYSTEM 750,000 21 (BASE PROJECT ALLOCATION - $750,000) 22 (XI) FRANCES SLOCUM STATE PARK 23 (A) REHABILITATE BRIDGE AND ROADS 400,000 24 (BASE PROJECT ALLOCATION - $400,000) 25 (B) REPAVE PARK ROAD AND PARKING AREAS 650,000 26 (BASE PROJECT ALLOCATION - $650,000) 27 (XII) FRENCH CREEK STATE PARK 28 (A) REHABILITATE CAMPS AND SERVICES 1,440,000 29 (BASE PROJECT ALLOCATION - $1,440,000) 30 (XIII) GIFFORD PINCHOT STATE PARK 19990H1023B3629 - 60 -
1 (A) RENOVATION OF DAY USE FACILITIES 800,000 2 (BASE PROJECT ALLOCATION - $800,000) 3 (B) REHABILITATE WATER SYSTEM 500,000 4 (BASE PROJECT ALLOCATION - $500,000) 5 (C) REPLACE PIT LATRINES 500,000 6 (BASE PROJECT ALLOCATION - $500,000) 7 (XIV) HILLS CREEK STATE PARK 8 (A) CAMPGROUND FACILITIES IMPROVEMENTS 300,000 9 (BASE PROJECT ALLOCATION - $300,000) 10 (XV) KETTLE CREEK STATE PARK 11 (A) REPLACE PIT LATRINES 870,000 12 (BASE PROJECT ALLOCATION - $870,000) 13 (XVI) KINGS GAP STATE PARK 14 (A) RENOVATE MAIN HOUSE 800,000 15 (BASE PROJECT ALLOCATION - $800,000) 16 (XVII) LAUREL HILL STATE PARK 17 (A) REHABILITATE SEWAGE SYSTEM 500,000 18 (BASE PROJECT ALLOCATION - $500,000) 19 (B) REPAVE ROAD 400,000 20 (BASE PROJECT ALLOCATION - $400,000) 21 (XVIII) LEHIGH GORGE STATE PARK 22 (A) BRIDGE AND TRAIL RECONSTRUCTION 1,200,000 23 (BASE PROJECT ALLOCATION - $1,200,000) 24 (XIX) LITTLE BUFFALO STATE PARK 25 (A) SWIMMING POOL REHABILITATION 1,275,000 26 (BASE PROJECT ALLOCATION - $1,275,000) 27 (XX) LITTLE PINE STATE PARK 28 (A) MODERNIZE RESTROOM AND BATH 29 FACILITIES 1,500,000 30 (BASE PROJECT ALLOCATION - $1,500,000) 19990H1023B3629 - 61 -
1 (XXI) LYMAN RUN STATE PARK 2 (A) REHABILITATE LYMAN RUN DAM 1,000,000 3 (BASE PROJECT ALLOCATION - $1,000,000) 4 (XXII) MAURICE K. GODDARD STATE PARK 5 (A) REHABILITATE MULTI-USE TRAIL 2,000,000 6 (BASE PROJECT ALLOCATION - $2,000,000) 7 (XXIII) MEMORIAL LAKE STATE PARK 8 (A) REHABILITATE DAM AND DAY USE AREA 600,000 9 (BASE PROJECT ALLOCATION - $600,000) 10 (XXIV) MORAINE STATE PARK 11 (A) REHABILITATE NORTH AND SOUTH SHORE 12 PARK ROAD 3,500,000 13 (BASE PROJECT ALLOCATION - $3,500,000) 14 (B) DEEPEN MARINA AREA 900,000 15 (BASE PROJECT ALLOCATION - $900,000) 16 (XXV) NOCKAMIXON STATE PARK 17 (A) PIT LATRINE REPLACEMENT AND INSTALL 18 FISHING PIER 700,000 19 (BASE PROJECT ALLOCATION - $700,000) 20 (B) RENOVATE POOL FACILITY 1,200,000 21 (BASE PROJECT ALLOCATION - $1,200,000) 22 (C) MARINA REHABILITATION 1,200,000 23 (BASE PROJECT ALLOCATION - $1,200,000) 24 (XXVI) PYMATUNING STATE PARK 25 (A) REPLACE PIT LATRINES 1,000,000 26 (BASE PROJECT ALLOCATION - $1,000,000) 27 (XXVII) OHIOPYLE STATE PARK 28 (A) RENOVATE BOATERS CHANGE HOUSE 550,000 29 (BASE PROJECT ALLOCATION - $550,000) 30 (XXVIII) OIL CREEK STATE PARK 19990H1023B3629 - 62 -
1 (A) REPLACE PIT LATRINES AND ASSOCIATED 2 UTILITIES 750,000 3 (BASE PROJECT ALLOCATION - $750,000) 4 (XXIX) OLE BULL STATE PARK 5 (A) REPLACE PIT LATRINES 750,000 6 (BASE PROJECT ALLOCATION - $750,000) 7 (XXX) PENN NURSERY 8 (A) EXPAND AND RENOVATE OFFICE 1,500,000 9 (BASE PROJECT ALLOCATION - $1,500,000) 10 (XXXI) POE VALLEY STATE PARK 11 (A) REPLACE PIT LATRINES 850,000 12 (BASE PROJECT ALLOCATION - $850,000) 13 (XXXII) PRESQUE ISLE STATE PARK 14 (A) RENOVATE PARK OFFICE 900,000 15 (BASE PROJECT ALLOCATION - $900,000) 16 (XXXIII) PRINCE GALLITZIN STATE PARK 17 (A) REHABILITATE SHOWER HOUSE 1,600,000 18 (BASE PROJECT ALLOCATION - $1,600,000) 19 (B) REHABILITATE SEWER SYSTEM 1,000,000 20 (BASE PROJECT ALLOCATION - $1,000,000) 21 (XXXIV) PYMATUNING STATE PARK 22 (A) REPLACE DOCKS AT JAMESTOWN BOAT 23 LIVERY 800,000 24 (BASE PROJECT ALLOCATION - $800,000) 25 (XXXV) R. B. WINTER STATE PARK 26 (A) REPLACE PIT LATRINES 1,950,000 27 (BASE PROJECT ALLOCATION - $1,950,000) 28 (XXXVI) RACCOON CREEK STATE PARK 29 (A) REHABILITATE WATER SYSTEM 1,700,000 30 (BASE PROJECT ALLOCATION - $1,700,000) 19990H1023B3629 - 63 -
1 (B) REHABILITATE SEWER SYSTEM 1,000,000 2 (BASE PROJECT ALLOCATION - $1,000,000) 3 (XXXVII) RICKETTS GLEN STATE PARK 4 (A) REHABILITATE PARK INFRASTRUCTURE 1,300,000 5 (BASE PROJECT ALLOCATION - $1,300,000) 6 (B) RENOVATE VISITOR CENTER AND OFFICE 1,100,000 7 (BASE PROJECT ALLOCATION - $1,100,000) 8 (XXXVIII) SHAWNEE STATE PARK 9 (A) REPLACE SEWAGE LIFT STATIONS 1,200,000 10 (BASE PROJECT ALLOCATION - $1,200,000) 11 (B) REHABILITATE SEWAGE TREATMENT PLANT 600,000 12 (BASE PROJECT ALLOCATION - $600,000) 13 (XXXIX) SHIKELLAMY STATE PARK 14 (A) REHABILITATION OF INFLATABLE DAM 770,000 15 (BASE PROJECT ALLOCATION - $770,000) 16 (XL) SUSQUEHANNOCK STATE FOREST 17 (A) RENOVATE OFFICE BUILDING 750,000 18 (BASE PROJECT ALLOCATION - $750,000) 19 (XLI) TIADAGHTON STATE FOREST 20 (A) REHABILITATE PINE CREEK TRAIL 2,000,000 21 (BASE PROJECT ALLOCATION - $2,000,000) 22 (B) RENOVATE/RECONSTRUCT OFFICE BUILDING 1,500,000 23 (BASE PROJECT ALLOCATION - $1,500,000) 24 (XLII) TIOGA STATE FOREST 25 (A) RENOVATE OFFICE BUILDING 700,000 26 (BASE PROJECT ALLOCATION - $700,000) 27 (XLIII) TUSCARORA STATE FOREST 28 (A) EXPAND AND RENOVATE OFFICE 750,000 29 (BASE PROJECT ALLOCATION - $750,000) 30 (XLIV) TYLER STATE PARK 19990H1023B3629 - 64 -
1 (A) RESURFACING PARK ROADS AND PARKING 500,000 2 (BASE PROJECT ALLOCATION - $500,000) 3 (XLV) WORLDS END STATE PARK 4 (A) REPLACE PIT LATRINES 2,560,000 5 (BASE PROJECT ALLOCATION - $2,560,000) 6 (XLVI) YELLOW CREEK STATE PARK 7 (A) REHABILITATE SEWER SYSTEM 850,000 8 (BASE PROJECT ALLOCATION - $850,000) 9 SECTION 11. ITEMIZATION OF PUBLIC HIGHWAY PROJECTS. 10 ADDITIONAL CAPITAL PROJECTS IN THE CATEGORY OF PUBLIC HIGHWAY 11 PROJECTS TO BE CONSTRUCTED BY THE DEPARTMENT OF TRANSPORTATION, 12 ITS SUCCESSORS OR ASSIGNS, AND TO BE FINANCED BY THE INCURRING 13 OF DEBT, OR FROM CURRENT REVENUES OF THE MOTOR LICENSE FUND, ARE 14 HEREBY ITEMIZED, TOGETHER WITH THEIR RESPECTIVE ESTIMATED 15 FINANCIAL COSTS, AS FOLLOWS: 16 TOTAL 17 PROJECT 18 PROJECT ALLOCATION 19 (1) ADAMS COUNTY 20 (I) S.R.0034 21 (A) MAIN STREET INTERSECTION WITH PA 234, 22 YORK STREET, BIGLERVILLE BOROUGH 105,000 23 (BASE PROJECT ALLOCATION - $30,000) 24 (LAND ALLOCATION - $10,000) 25 (DESIGN AND CONTINGENCIES - $65,000) 26 (II) S.R.0094 27 (A) MAIN STREET INTERSECTION WITH IDAVILLE 28 ROAD, YORK SPRINGS BOROUGH AND 29 HUNTINGTON TOWNSHIP 250,000 30 (BASE PROJECT ALLOCATION - $50,000) 19990H1023B3629 - 65 -
1 (LAND ALLOCATION - $100,000) 2 (DESIGN AND CONTINGENCIES - $100,000) 3 (III) S.R.0097 4 (A) QUEEN STREET INTERSECTION WITH PA 194, 5 KING STREET, LITTLESTOWN BOROUGH 87,000 6 (BASE PROJECT ALLOCATION - $12,000) 7 (LAND ALLOCATION - $10,000) 8 (DESIGN AND CONTINGENCIES - $65,000) 9 (IV) S.R.0015 10 (A) PAVEMENT RESTORATION, BRIDGE 11 REHABILITATION AND SAFETY IMPROVEMENTS, 12 MARYLAND STATE LINE TO YORK COUNTY 13 LINE 6,100,000 14 (BASE PROJECT ALLOCATION - $6,000,000) 15 (DESIGN AND CONTINGENCIES - $100,000) 16 (V) EISENHOWER DRIVE 17 (A) REHABILITATION AND IMPROVEMENT OF 18 EISENHOWER DRIVE FROM HIGH STREET TO 19 OXFORD AVENUE 900,000 20 (B) REHABILITATION AND IMPROVEMENT OF 21 EISENHOWER DRIVE FROM OXFORD AVENUE TO 22 PA 116 1,270,000 23 (VI) PA 94 24 (A) SAFETY IMPROVEMENTS TO BOLLINGER AND 25 MEHRING ROAD INTERCHANGE 200,000 26 (VII) U.S.30 27 (A) U.S.30/U.S.15 INTERCHANGE, INTERCHANGE 28 IMPROVEMENT 1,850,000 29 (BASE PROJECT ALLOCATION - $1,600,000) 30 (LAND ALLOCATION - $100,000) 19990H1023B3629 - 66 -
1 (DESIGN AND CONTINGENCIES - $150,000) 2 (2) ALLEGHENY COUNTY 3 (I) S.R.0019 4 (A) U.S.19 ABBEYVILLE ROAD EXTENSION, 5 UPPER SAINT CLAIR TOWNSHIP 935,000 6 (B) ADD INTERSECTION AND CONNECTOR ON WEST 7 SIDE OF S.R.0019 AT ABBEYVILLE ROAD 900,000 8 (C) U.S.19 AND HIGHLAND AVENUE 9 INTERSECTION, TURNING LANES AND 10 SIGNALS 589,000 11 (BASE PROJECT ALLOCATION - $194,000) 12 (LAND ALLOCATION - $275,000) 13 (DESIGN AND CONTINGENCIES - $120,000) 14 (D) U.S.19 FROM S.R.0051 JUNCTION TO 15 S.R.0065 SPLIT, PAVEMENT RESTORATION, 16 BRIDGE REHABILITATION AND SAFETY 17 IMPROVEMENTS 350,000 18 (BASE PROJECT ALLOCATION - $300,000) 19 (DESIGN AND CONTINGENCIES - $50,000) 20 (E) U.S.19 TRUCK ROUTE FROM S.R.4070 NORTH 21 TO U.S.19, PAVEMENT AND RESTORATION, 22 BRIDGE REHABILITATION AND SAFETY 23 IMPROVEMENTS 150,000 24 (BASE PROJECT ALLOCATION - $100,000) 25 (DESIGN AND CONTINGENCIES - $50,000) 26 (F) U.S.19 TRUCK ROUTE FROM I-279 TO 27 S.R.8079, PAVEMENT RESTORATION, BRIDGE 28 REHABILITATION AND SAFETY IMPROVEMENTS 250,000 29 (BASE PROJECT ALLOCATION - $200,000) 30 (DESIGN AND CONTINGENCIES - $50,000) 19990H1023B3629 - 67 -
1 (G) U.S.19 PINE CREEK HILL TO WALLACE 2 ROAD, PINE AND MCCANDLESS TOWNSHIPS, 3 RESTORATION 867,000 4 (BASE PROJECT ALLOCATION - $867,000) 5 (H) U.S.19 WEST END BYPASS TO WEST END 6 BRIDGE, CITY OF PITTSBURGH, NEW 7 ROADWAY 4,000,000 8 (BASE PROJECT ALLOCATION - $4,000,000) 9 (I) U.S.19 GATESHEAD/HIDDEN VALLEY 10 INTERSECTION, PETERS TOWNSHIP, 11 CONSTRUCTION COSTS, NEW TRAFFIC 12 SIGNALS 400,000 13 (II) S.R.0060 14 (A) IMPROVEMENTS TO ROBINSON TOWN CENTRE 15 BOULEVARD AND MONTOUR CHURCH ROAD AND 16 THEIR INTERSECTION WITH S.R.60 AND 17 U.S.22/30, ROBINSON TOWNSHIP AND NORTH 18 FAYETTE TOWNSHIP 5,224,000 19 (BASE PROJECT ALLOCATION - $3,174,000) 20 (LAND ALLOCATION - $1,600,000) 21 (DESIGN AND CONTINGENCIES - $450,000) 22 (B) S.R.0060 FROM U.S.22 TO BEAVER COUNTY 23 LINE, PAVEMENT RESTORATION, BRIDGE 24 REHABILITATION AND SAFETY IMPROVEMENTS 1,450,000 25 (BASE PROJECT ALLOCATION - $1,400,000) 26 (DESIGN AND CONTINGENCIES - $50,000) 27 (C) CONSTRUCTION OF ENLOW INTERCHANGE AND 28 ACCESS ROAD, FINDLAY TOWNSHIP 23,500,000 29 (BASE PROJECT ALLOCATION - $19,000,000) 30 (DESIGN AND CONTINGENCIES - $4,500,000) 19990H1023B3629 - 68 -
1 (D) S.R.0060 BUSINESS ROUTE, FROM 2 S.R.0060/S.R.6060 JUNCTION TO 3 S.R.6060/S.R.0060 JUNCTION, PAVEMENT 4 RESTORATION, BRIDGE REHABILITATION AND 5 SAFETY IMPROVEMENTS 850,000 6 (BASE PROJECT ALLOCATION - $800,000) 7 (DESIGN AND CONTINGENCIES - $50,000) 8 (E) PA 60 INTERSECTION OF PA 60 AND 9 CHURCHILL, ROBINSON TOWNSHIP, SAFETY 10 IMPROVEMENT 25,000 11 (BASE PROJECT ALLOCATION - $25,000) 12 (F) PA 60 FLAUGHERTY RUN INTERCHANGE TO 13 BEAVER COUNTY LINE, FINDLAY AND MOON 14 TOWNSHIPS, RECONSTRUCTION 2,256,000 15 (BASE PROJECT ALLOCATION - $2,256,000) 16 (G) WIDEN NORTHBOUND S.R.0060 FROM ENLOW 17 ROAD OVERPASS TO FLAUGHERTY RUN EXIT 18 RAMP 6,600,000 19 (BASE PROJECT ALLOCATION - $6,000,000) 20 (DESIGN AND CONTINGENCIES - $600,000) 21 (H) MOON CLINTON ROAD/S.R.0060 22 INTERCHANGE, ADD RAMPS AND RELOCATE 23 EXISTING RAMP TO IMPROVE ACCESS TO 24 S.R.0060 AND PITTSBURGH INTERNATIONAL 25 AIRPORT 8,500,000 26 (BASE PROJECT ALLOCATION - $7,000,000) 27 (DESIGN AND CONTINGENCIES - $1,500,000) 28 (I) WIDEN MOON CLINTON ROAD AND EXIT RAMP 29 TERMINALS 0.5 MILES WEST OF S.R.0060 TO 30 500 FEET EAST OF S.R.0060 BUSINESS 17,500,000 19990H1023B3629 - 69 -
1 (BASE PROJECT ALLOCATION - $15,000,000) 2 (DESIGN AND CONTINGENCIES - $2,500,000) 3 (III) S.R.0065 4 (A) WEST END BRIDGE, NORTH APPROACH TO 5 S.R.0065 1,325,000 6 (BASE PROJECT ALLOCATION - $1,325,000) 7 (B) S.R.0065 FROM U.S.19 TO S.R.3104, 8 PAVEMENT RESTORATION, BRIDGE 9 REHABILITATION AND SAFETY IMPROVEMENTS 250,000 10 (BASE PROJECT ALLOCATION - $200,000) 11 (DESIGN AND CONTINGENCIES - $50,000) 12 (IV) S.R.0079 13 (A) I-79 RECONSTRUCTION FROM REST AREA TO 14 KIRWAN HEIGHTS, SOUTH FAYETTE TOWNSHIP 15 AND BRIDGEVILLE BOROUGH 1,510,000 16 (BASE PROJECT ALLOCATION - $1,510,000) 17 (B) I-79 FROM WASHINGTON COUNTY LINE TO 18 BUTLER COUNTY LINE, PAVEMENT 19 RESTORATION, BRIDGE REHABILITATION AND 20 SAFETY IMPROVEMENTS 2,850,000 21 (BASE PROJECT ALLOCATION - $2,800,000) 22 (DESIGN AND CONTINGENCIES - $50,000) 23 (C) INTERCHANGE AT I-79/PARKWAY AND PENN 24 CENTER WEST INTERCHANGE AT CAMPBELL'S 25 RUN ROAD, COLLIER AND ROBINSON 26 TOWNSHIPS 50,000,000 27 (BASE PROJECT ALLOCATION - $32,000,000) 28 (LAND ALLOCATION - $12,000,000) 29 (DESIGN AND CONTINGENCIES - $6,000,000) 30 (D) I-79, RAMP E, SOUTH FAYETTE 19990H1023B3629 - 70 -
1 TOWNSHIP/BRIDGEVILLE INTERCHANGE, 2 RECONSTRUCTION 1,008,000 3 (BASE PROJECT ALLOCATION - $1,008,000) 4 (E) I-79,PARKWAY WEST, CONSTRUCTION OF 5 MISSING RAMPS FROM I-79 SOUTHBOUND TO 6 PARKWAY WEST S.R.0060 AND PARKWAY WEST 7 EASTBOUND TO I-79 NORTH 70,000,000 8 (F) I-79 WARRENDALE 9 INTERCHANGE/WARRENDALE/BAYNE ROAD, 10 DEVELOP PARTNERSHIP FOR HIGHWAY 11 IMPROVEMENTS TO ENABLE SITE DEVELOPMENT 12 FOR TECH 21 TECHNOLOGY PARK 15,000,000 13 (V) S.R.0279 14 (A) I-279, PENN CENTER WEST INTERCHANGE 15 WITH CAMPBELLS RUN ROAD, COLLIER 16 TOWNSHIP AND ROBINSON TOWNSHIP 29,000,000 17 (BASE PROJECT ALLOCATION - $19,500,000) 18 (LAND ALLOCATION - $7,000,000) 19 (DESIGN AND CONTINGENCIES - $2,500,000) 20 (B) I-279 FROM I-79 (PENN LINCOLN PARKWAY) 21 TO I-79 IN NORTHERN ALLEGHENY COUNTY, 22 PAVEMENT RESTORATION, BRIDGE 23 REHABILITATION AND SAFETY IMPROVEMENTS 1,050,000 24 (BASE PROJECT ALLOCATION - $1,000,000) 25 (DESIGN AND CONTINGENCIES - $50,000) 26 (C) I-279, SOUND BARRIERS FROM VENTURE 27 STREET EXIT NORTH TO THE PITTSBURGH 28 CITY LINE, CITY OF PITTSBURGH 2,000,000 29 (D) I-279, FORT PITT BRIDGE TO CAMP HORN 30 ROAD, CITY OF PITTSBURGH AND ROSS 19990H1023B3629 - 71 -
1 TOWNSHIP, SAFETY IMPROVEMENT/FREEWAY 2 SURVEILLANCE 60,000 3 (DESIGN AND CONTINGENCIES - $60,000) 4 (E) I-279/ANNER STREET SLIDE, CITY OF 5 PITTSBURGH, SLOPE IMPROVEMENT 59,000 6 (BASE PROJECT ALLOCATION - $35,000) 7 (LAND ALLOCATION - $2,000) 8 (DESIGN AND CONTINGENCIES - $22,000) 9 (F) I-279, RETAINING WALL NUMBER 4, CITY 10 OF PITTSBURGH, SLOPE STABILIZATION 161,000 11 (BASE PROJECT ALLOCATION - $120,000) 12 (LAND ALLOCATION - $15,000) 13 (DESIGN AND CONTINGENCIES - $26,000) 14 (G) I-279, ANNER STREET SLIDE, CITY OF 15 PITTSBURGH, RECONSTRUCTION 100,000 16 (BASE PROJECT ALLOCATION - $100,000) 17 (H) I-279, RETAINING WALL NUMBER 4, CITY 18 OF PITTSBURGH, RECONSTRUCTION 180,000 19 (BASE PROJECT ALLOCATION - $180,000) 20 (I) I-279, FT. PITT BRIDGE TO CAMP HORN 21 ROAD, CITY OF PITTSBURGH AND ROSS 22 TOWNSHIP, SAFETY IMPROVEMENT 330,000 23 (BASE PROJECT ALLOCATION - $330,000) 24 (VI) S.R.0837 25 (A) WATERFRONT IMPROVEMENTS TO S.R.0837 26 FROM 8TH AVENUE TO EAST DRIVE, WEST 27 HOMESTEAD BOROUGH, HOMESTEAD BOROUGH 28 AND MUNHALL BOROUGH 587,000 29 (B) S.R.0837 FROM DUQUESNE TO MUNHALL, 30 PAVEMENT RESTORATION, BRIDGE 19990H1023B3629 - 72 -
1 REHABILITATION AND SAFETY IMPROVEMENTS 250,000 2 (BASE PROJECT ALLOCATION - $200,000) 3 (DESIGN AND CONTINGENCIES - $50,000) 4 (C) PA 837, 8TH AVENUE TO EAST DRIVE, WEST 5 HOMESTEAD, HOMESTEAD AND MUNHALL 6 BOROUGHS, SAFETY IMPROVEMENT 117,000 7 (BASE PROJECT ALLOCATION - $117,000) 8 (D) PA 837, PARRY STREET TO WITAKER WAY, 9 WEST HOMESTEAD, HOMESTEAD AND MUNHALL 10 BOROUGHS, SAFETY IMPROVEMENT 146,000 11 (BASE PROJECT ALLOCATION - $146,000) 12 (E) WIDEN S.R.0837 FROM RAVINE ST. AREA IN 13 MUNHALL TO EAST FLYOVER BRIDGE AND 14 CONTINUING TO THE WHITAKER/RANKIN 15 BRIDGE 6,000,000 16 (VII) S.R.3004 17 (A) INTERSECTION IMPROVEMENTS WITH 18 S.R.3034 AND LESNETT ROAD 2,500,000 19 (VIII) S.R.3004 AND S.R.3009 20 (A) WIDEN MCMURRAY ROAD TO 3 LANES FROM 21 SOUTH PARK ROAD AND CLIFTON ROAD AND 22 WIDEN APPROACHES AT SOUTH PARK ROAD AND 23 CLIFTON ROAD 2,800,000 24 (IX) S.R.3006 25 (A) IMPROVEMENTS TO BOYCE ROAD FROM 26 S.R.0019 TO S.R.3005 2,800,000 27 (X) S.R.3009 AND S.R.2040 28 (A) INTERSECTION AND APPROACH 29 IMPROVEMENTS 2,000,000 30 (XI) S.R.3036 19990H1023B3629 - 73 -
1 (A) INTERSECTION IMPROVEMENTS WITH 2 S.R.3034 850,000 3 (XII) S.R.3103 4 (A) WIDEN AND INTERSECTION IMPROVEMENTS 5 FOR MCKEE ROAD, NORTH FAYETTE TOWNSHIP 900,000 6 (XIII) S.R.3160 7 (A) GRADE-SEPARATED INTERCHANGE AT BEERS 8 SCHOOL ROAD AND S.R.60, MOON TOWNSHIP 5,000,000 9 (LAND ALLOCATION - $1,000,000) 10 (DESIGN AND CONTINGENCIES - $4,000,000) 11 (B) DIRECTIONAL INTERCHANGE AT FLAUGHERTY 12 RUN ROAD, MOON TOWNSHIP 18,000,000 13 (BASE PROJECT ALLOCATION - $15,000,000) 14 (DESIGN AND CONTINGENCIES - $3,000,000) 15 (XIV) LOCAL ROAD CONNECTOR 16 (A) CONSTRUCT NEW ROAD FROM INTERSECTION 17 OF S.R.3005 AND S.R.3006 TO INTERCHANGE 18 OF THE SOUTHERN BELTWAY AND I-79 30,000,000 19 (XV) S.R.0028 20 (A) DEVELOPMENT OF A CONNECTOR ROAD FROM 21 S.R.0028 TO ROCK AIRPORT, TARENTUM 22 BOROUGH, EAST DEER TOWNSHIP, INDIANA 23 TOWNSHIP AND WEST DEER TOWNSHIP 3,000,000 24 (BASE PROJECT ALLOCATION - $2,000,000) 25 (LAND ALLOCATION - $500,000) 26 (DESIGN AND CONTINGENCIES - $500,000) 27 (B) S.R.0028 FROM ETNA TO BUTLER COUNTY 28 LINE, PAVEMENT RESTORATION, BRIDGE 29 REHABILITATION AND SAFETY IMPROVEMENTS 2,350,000 30 (BASE PROJECT ALLOCATION - $2,300,000) 19990H1023B3629 - 74 -
1 (DESIGN AND CONTINGENCIES - $50,000) 2 (C) EAST OHIO RELOCATION, MILLVALE BOROUGH 3 WALL ALONG ROUTE 28 AT MILLVALE 4 INTERCHANGE 1,805,000 5 (BASE PROJECT ALLOCATION - $1,020,000) 6 (DESIGN AND CONTINGENCIES - $785,000) 7 (D) PA 28 SOUTHBOUND FROM HIGHLAND PARK 8 BRIDGE TO RAVINE STREET, RESTORATION 400,000 9 (BASE PROJECT ALLOCATION - $400,000) 10 (E) PA 28 NORTHBOUND FROM RAVINE STREET TO 11 HIGHLAND PARK, SHARPSBURG BOROUGH, 12 RESTORATION 400,000 13 (BASE PROJECT ALLOCATION - $400,000) 14 (F) PA 28 HIGHLAND PARK BRIDGE TO 15 DELAFIELD, ASPINWALL BOROUGH, 16 RECONSTRUCTION 120,000 17 (BASE PROJECT ALLOCATION - $120,000) 18 (XVI) S.R.0022 19 (A) U.S.22 FROM CARNEGIE TO OHIO STATE 20 LINE, PAVEMENT RESTORATION, BRIDGE 21 REHABILITATION AND SAFETY IMPROVEMENTS 850,000 22 (BASE PROJECT ALLOCATION - $800,000) 23 (DESIGN AND CONTINGENCIES - $50,000) 24 (XVII) S.R.0376 25 (A) I-376 FROM I-279 TO THE PENNSYLVANIA 26 TURNPIKE, PAVEMENT RESTORATION, BRIDGE 27 REHABILITATION AND SAFETY IMPROVEMENTS 1,550,000 28 (BASE PROJECT ALLOCATION - $1,500,000) 29 (DESIGN AND CONTINGENCIES - $50,000) 30 (B) I-376, GRANT STREET TO GREENSBURG 19990H1023B3629 - 75 -
1 PIKE, CITY OF PITTSBURGH AND EDGEWOOD 2 AND BRADDOCK HILLS BOROUGHS, 3 RECONSTRUCTION 2,512,000 4 (BASE PROJECT ALLOCATION - $2,512,000) 5 (XVIII) S.R.0579 6 (A) I-579 FROM I-279 TO THE PENNSYLVANIA 7 TURNPIKE, PAVEMENT RESTORATION, BRIDGE 8 REHABILITATION AND SAFETY IMPROVEMENTS 250,000 9 (BASE PROJECT ALLOCATION - $200,000) 10 (DESIGN AND CONTINGENCIES - $50,000) 11 (XIX) S.R.3070 12 (A) EXTENSION OF INDUSTRY DRIVE BETWEEN 13 MCCLAREN ROAD AND ENLOW ROAD, FINDLAY 14 TOWNSHIP 8,125,000 15 (BASE PROJECT ALLOCATION - $6,000,000) 16 (LAND ALLOCATION - $1,000,000) 17 (DESIGN AND CONTINGENCIES - $1,125,000) 18 (B) WIDEN, SAFETY IMPROVEMENTS, UPGRADE 19 MCCLAREN ROAD (S.R.3070) FROM MCCLAREN 20 INTERCHANGE (S.R.0060) TO VILLAGE OF 21 ENLOW WITH IMPROVEMENTS TO THE FIVE- 22 POINT INTERSECTION AT ENLOW 8,000,000 23 (XX) S.R.2082 24 (A) OAKMONT AND PLUM BOROUGHS, WIDENING 25 AND RESTORATION OF HULTON ROAD FROM THE 26 HULTON BRIDGE TO S.R.2058 3,000,000 27 (BASE PROJECT ALLOCATION - $2,500,000) 28 (DESIGN AND CONTINGENCIES - $500,000) 29 (XXI) INTELLIGENT TRANSPORTATION SYSTEMS 30 (A) INSTALLATION OF INTELLIGENT 19990H1023B3629 - 76 -
1 TRANSPORTATION SYSTEMS AT VARIOUS AREAS 2 WITHIN THE PITTSBURGH REGIONAL AREA 500,000 3 (XXII) PA 65 4 (A) PA 65 FROM GRANT TO RIVERVIEW, 5 BELLEVUE BOROUGH, WIDEN ROADWAY, 722,000 6 (BASE PROJECT ALLOCATION - $580,000) 7 (LAND ALLOCATION - $95,000) 8 (DESIGN AND CONTINGENCIES - $47,000) 9 (XXIII) NEW MON RIVER BRIDGE 10 (A) FROM WABASH TUNNEL TO STANWIX, CITY OF 11 PITTSBURGH, NEW BRIDGE 32,400,000 12 (BASE PROJECT ALLOCATION - $24,000,000) 13 (LAND ALLOCATION - $2,000,000) 14 (DESIGN AND CONTINGENCIES - $6,400,000) 15 (XXIV) SOUTH MILLVALE STREET BRIDGE 16 (A) OVER EAST BUSWAY/CONRAIL, CITY OF 17 PITTSBURGH, BRIDGE REHABILITATION 1,000,000 18 (BASE PROJECT ALLOCATION - $1,000,000) 19 (XXV) BANKSVILLE CONNECTION 20 (A) FROM WABASH TUNNEL TO BANKSVILLE, CITY 21 OF PITTSBURGH, NEW ROADWAY 11,000,000 22 (BASE PROJECT ALLOCATION - $10,000,000) 23 (DESIGN AND CONTINGENCIES - $1,000,000) 24 (XXVI) S.R.9900 25 (A) NORTH FAYETTE TOWNSHIP, NEW ROADWAY 26 AND RECONSTRUCTION OF PITTSBURGH 27 TECHNOLOGY INSTITUTE ACCESS ROAD 900,000 28 (XXVII) SUMMIT PARK DRIVE 29 (A) SUMMIT PARK DRIVE/ROBINSON TOWN CENTER 30 BOULEVARD INTERCHANGE, NORTH FAYETTE 19990H1023B3629 - 77 -
1 TOWNSHIP, SAFETY IMPROVEMENT/ADD TURN 2 LANE 288,000 3 (BASE PROJECT ALLOCATION - $288,000) 4 (XXVIII) PA 885 5 (A) LIBERTY BRIDGE TO PARKWAY WEST, CITY 6 OF PITTSBURGH, RESTORATION 1,222,000 7 (BASE PROJECT ALLOCATION - $1,222,000) 8 (B) LEBANON CHURCH ROAD S.R.2040 TO 9 MIFFLIN ROAD S.R.2045 TO ACCOMMODATE 10 ADTRANZ, WATERFRONT AND OTHER 11 DEVELOPMENT 5,000,000 12 (C) S.R.0885 RECONSTRUCTION, IMPROVEMENT 13 UPGRADES TO S.R.0885 BETWEEN LEBANON 14 CHURCH ROAD (S.R.2040) AND JUNCTION OF 15 MIFFLIN ROAD (S.R.2045) AND S.R.0885 TO 16 ACCOMMODATE ADTRANZ, WATERFRONT AND 17 OTHER SIGNIFICANT DEVELOPMENT AND 18 EXPANSION IN THE MON VALLEY 3,000,000 19 (XXIX) S.R.1019 20 (A) ACCESS ROAD FROM S.R.1019 (BUTLER 21 LOGAN AIRPORT ROAD) TO ROCK AIRPORT, 22 WEST DEER TOWNSHIP 500,000 23 (BASE PROJECT ALLOCATION - $470,000) 24 (DESIGN AND CONTINGENCIES - $30,000) 25 (XXX) PA 910 26 (A) I-79 INTERCHANGE WITH PA 910, MARSHALL 27 TOWNSHIP, RECONSTRUCTION 301,000 28 (BASE PROJECT ALLOCATION - $301,000) 29 (XXXI) S.R.3056 30 (A) CHESTNUT STREET, CARNEGIE BOROUGH, 19990H1023B3629 - 78 -
1 SAFETY IMPROVEMENT 70,000 2 (BASE PROJECT ALLOCATION - $70,000) 3 (XXXII) S.R.0060/S.R.0022/S.R.0030 4 (A) S.R.0060/S.R.0022/S.R.0030, 5 FEASIBILITY STUDY TO PROVIDE INTERSTATE 6 HIGHWAY DESIGNATION TO PITTSBURGH 7 INTERNATIONAL AIRPORT FROM REGIONAL 8 HIGHWAYS 1,000,000 9 (XXXIII) KIRWAN HEIGHTS INTERCHANGE 10 (A) KIRWAN HEIGHTS INTERCHANGE, 11 IMPROVEMENTS, CONNECTION TO THOMAS RUN 12 ROAD, IMPROVEMENTS TO S.R.0050 13 INTERSECTION 9,000,000 14 (XXXIV) ROCK AIRPORT INDUSTRIAL PARK 15 (A) ROCK AIRPORT INDUSTRIAL PARK, ACCESS 16 ROAD, FROM LITTLE DEER CREEK ROAD, 17 S.R.1015 TO RUSSELTON AIRPORT ROAD 6,000,000 18 (XXXV) BAPTIST ROAD/BROUGHTON ROAD/HORNING 19 CORRIDOR 20 (A) BAPTIST ROAD/BROUGHTON ROAD/ROUTE 88/ 21 HORNING ROAD, BAPTIST ROAD AND 22 BROUGHTON ROAD, CONSTRUCTION OF TURNING 23 LANES AND INCREASE OF STORAGE LENGTH, 24 BAPTIST AND HORNING ROAD AND ROUTE 88 25 AND BROUGHTON ROAD, OPTIMIZING TRAFFIC 26 SIGNAL TIMINGS, ROUTE 88 AND HORNING 27 ROAD, PROTECTED TURN PHASES AND 28 OPTIMIZE TRAFFIC SIGNAL TIMINGS 1,200,000 29 (XXXVI) LEBANON CHURCH ROAD 30 (A) INTERSECTIONS OF LEBANON CHURCH ROAD 19990H1023B3629 - 79 -
1 AND CLOVE DRIVE, LEBANON CHURCH ROAD 2 AND RICHALLER DRIVE, PLEASANT HILLS 3 BOROUGH, CONSTRUCT LEFT-HAND TURN LANE, 4 ADDING TRAFFIC SIGNS AND SIGNALS 4,000,000 5 (XXXVII) COCHRAN ROAD 6 (A) INTERSECTIONS OF COCHRAN ROAD AND 7 BEVERLY ROAD, MOUNT LEBANON TOWNSHIP, 8 RELINE TO CREATE LEFT-HAND TURN LANE, 9 REPLACE TRAFFIC SIGNAL, INSTALL 10 FIBEROPTIC INTERCONNECTING SIGNAL 11 SYSTEMS 120,000 12 (XXXVIII) MOON-CLINTON ROAD 13 (A) S.R.0060 TO S.R.0030 UPGRADE, WIDEN 14 AND STRAIGHTEN 5,000,000 15 (BASE PROJECT ALLOCATION - $3,000,000) 16 (DESIGN AND CONTINGENCIES - $2,000,000) 17 (XXXIX) CHERRINGTON PARKWAY 18 (A) EXTEND CHERRINGTON BUSINESS PARK 19 INTERNAL ACCESS ROAD THROUGH PITTSBURGH 20 INTERNATIONAL AIRPORT PROPERTY TO EWING 21 ROAD AND NEW INTERCHANGE AT S.R.0060 22 (BUSINESS) 3,000,000 23 (XL) S.R.3107 24 (A) WIDEN, SIGNALIZATION AND SAFETY 25 IMPROVEMENTS TO EWING ROAD (S.R.3107) 26 AT NEW INTERCHANGE WITH S.R.0060 27 (BUSINESS) 2,000,000 28 (XLI) MCCLAREN ROAD AREA 29 (A) INTERNAL ACCESS ROAD FROM RIDC PARK 30 TERMINUS OF INDUSTRY DRIVE TO MCCLAREN 19990H1023B3629 - 80 -
1 ROAD (S.R.3070) AND MCCLAREN 2 INTERCHANGE ON S.R.0060 5,000,000 3 (XLII) MCKEES ROCKS ACCESS ROAD 4 (A) NEW ACCESS ROAD FROM ROUTE 51 AT WEST 5 CARSON STREET INTERSECTION TO STOWE 6 TOWNSHIP TO OPEN SITES FOR 7 REDEVELOPMENT 6,250,000 8 (XLIII) AIRPORT MULTI-MODAL TRANSPORTATION 9 CORRIDOR 10 (A) MULTI-USE TOLL FACILITY FEASIBILITY 11 STUDY TO RELIEVE PARKWAY WEST. PROJECT 12 FROM S.R.0060/MONTOUR INTERCHANGE TO 13 PITTSBURGH CENTRAL BUSINESS DISTRICT 14 VIA ROBINSON-KENNEDY-STOWE-MCKEES 15 ROCKS-BRUNOT ISLAND AND S.R.0065 ON THE 16 NORTH SHORE 1,000,000 17 (3) ARMSTRONG COUNTY 18 (I) S.R.3017 19 (A) INTERSECTION OF S.R.3017 AND PA 28, 20 SOUTH BUFFALO TOWNSHIP, SAFETY 21 IMPROVEMENT/ADD LANE 567,000 22 (BASE PROJECT ALLOCATION - $500,000) 23 (LAND ALLOCATION - $10,000) 24 (DESIGN AND CONTINGENCIES - $57,000) 25 (II) PA 156 26 (A) INTERSECTION OF PA 156 AND PA 210, 27 SOUTH BEND TOWNSHIP, SAFETY 28 IMPROVEMENT 160,000 29 (BASE PROJECT ALLOCATION - $120,000) 30 (LAND ALLOCATION - $10,000) 19990H1023B3629 - 81 -
1 (DESIGN AND CONTINGENCIES - $30,000) 2 (III) PA 268 3 (A) PINE STREET TO CEDAR DRIVE, EAST 4 FRANKLIN TOWNSHIP, SAFETY IMPROVEMENT 346,000 5 (BASE PROJECT ALLOCATION - $240,000) 6 (LAND ALLOCATION - $50,000) 7 (DESIGN AND CONTINGENCIES - $56,000) 8 (B) INTERSECTION OF PA 268 AND MALL 9 ENTRANCE, EAST FRANKLIN TOWNSHIP, 10 SAFETY IMPROVEMENT 176,000 11 (BASE PROJECT ALLOCATION - $140,000) 12 (LAND ALLOCATION - $5,000) 13 (DESIGN AND CONTINGENCIES - $31,000) 14 (IV) WETLAND BANKING 15 (A) COUNTYWIDE, RECONSTRUCTION OF WETLAND 16 BANKING 84,000 17 (BASE PROJECT ALLOCATION - $40,000) 18 (LAND ALLOCATION - $20,000) 19 (DESIGN AND CONTINGENCIES - $24,000) 20 (4) BEAVER COUNTY 21 (I) S.R.0051/S.R.0065 22 (A) S.R.0051/S.R.0065 FROM FREEDOM BOROUGH 23 TO BRIDGEWATER BOROUGH, PAVEMENT 24 RESTORATION, BRIDGE REHABILITATION AND 25 SAFETY IMPROVEMENTS 350,000 26 (BASE PROJECT ALLOCATION - $300,000) 27 (DESIGN AND CONTINGENCIES - $50,000) 28 (II) S.R.0060 29 (A) S.R.0060 FROM ALLEGHENY COUNTY LINE TO 30 LAWRENCE COUNTY LINE, PAVEMENT 19990H1023B3629 - 82 -
1 RESTORATION, BRIDGE REHABILITATION AND 2 SAFETY IMPROVEMENTS 1,850,000 3 (BASE PROJECT ALLOCATION - $1,800,000) 4 (DESIGN AND CONTINGENCIES - $50,000) 5 (B) PA 60, BEAVER AND ALLEGHENY COUNTY 6 LINE TO PA 151 INTERCHANGE, HOPEWELL 7 TOWNSHIP, RECONSTRUCTION 2,059,000 8 (BASE PROJECT ALLOCATION - $2,059,000) 9 (C) PA 60, PA 151 INTERCHANGE TO GREEN 10 GARDEN INTERCHANGE, HOPEWELL TOWNSHIP, 11 RECONSTRUCTION 2,765,000 12 (BASE PROJECT ALLOCATION - $2,765,000) 13 (D) PA 60, GREEN GARDEN ROAD TO CENTER 14 EXIT, HOPEWELL AND CENTER TOWNSHIPS, 15 RECONSTRUCTION 7,450,000 16 (BASE PROJECT ALLOCATION - $7,450,000) 17 (III) S.R.9900 18 (A) CONSTRUCTION OF WOODLAWN AVENUE 19 EXTENSION IN CITY OF ALIQUIPPA 300,000 20 (BASE PROJECT ALLOCATION - $280,000) 21 (DESIGN AND CONTINGENCIES - $20,000) 22 (IV) LOGAN LANE 23 (A) WIDEN ROADWAY BETWEEN S.R.2001 AND 24 S.R.0065, HARMONY TOWNSHIP 1,500,000 25 (V) S.R.0168 26 (A) RECONSTRUCTION AND IMPROVEMENTS 27 BETWEEN S.R.0018 AND S.R.0030, HANOVER 28 AND GREENE TOWNSHIPS 10,000,000 29 (VI) S.R.0288 30 (A) WIDENING AND IMPROVEMENTS, INCLUDING 19990H1023B3629 - 83 -
1 THE REMOVAL OF DANGEROUS TURNS 200,000,000 2 (VII) S.R.0588 3 (A) RESURFACING AND IMPROVEMENTS TO 4 HIGHWAY 50,000,000 5 (VIII) PENNSYLVANIA TURNPIKE 6 (A) CONSTRUCTION OF AN EXIT RAMP ON 7 CONCORD CHURCH ROAD, (S.R.0588) NORTH 8 SEWICKLEY TOWNSHIP 35,000,000 9 (IX) PA 151 10 (A) PA 151 FROM KANE ROAD AT GRINGO ROAD, 11 HOPEWELL TOWNSHIP, RELOCATION 300,000 12 (BASE PROJECT ALLOCATION - $260,000) 13 (LAND ALLOCATION - $40,000) 14 (X) PA 51 15 (A) ROCHESTER-MONACA BRIDGE TO ALIQUIPPA- 16 AMBRIDGE BRIDGE, CITY OF ALIQUIPPA, 17 RECONSTRUCTION 3,000,000 18 (BASE PROJECT ALLOCATION - $3,000,000) 19 (B) EXTENSION OF WOODLAWN ROAD EXTENSION, 20 PA 51, FROM FRANKLIN AVENUE, CITY OF 21 ALIQUIPPA 3,000,000 22 (BASE PROJECT ALLOCATION - $3,000,000) 23 (XI) PA 65 24 (A) STATE STREET TO PA 51, HARMONY 25 TOWNSHIP AND BADEN AND CONWAY BOROUGHS, 26 RECONSTRUCTION 2,400,000 27 (BASE PROJECT ALLOCATION - $2,400,000) 28 (XII) WOODLAWN AVENUE 29 (A) WOODLAWN AVENUE EXTENSION, NEW 30 ROADWAY 400,000 19990H1023B3629 - 84 -
1 (BASE PROJECT ALLOCATION - $400,000) 2 (XIII) SPROAT STREET 3 (A) BADEN AND ECONOMY BOROUGHS, NEW 4 CONNECTOR ROAD FROM SPROAT STREET TO 5 QUIGLEY HIGH SCHOOL, 1 MILE LONG 1,000,000 6 (BASE PROJECT ALLOCATION - $1,000,000) 7 (XIV) WOLFE LANE 8 (A) WOLFE LANE CONNECTOR, BRIDGEWATER 9 BOROUGH, ENHANCEMENT 16,000 10 (BASE PROJECT ALLOCATION - $16,000) 11 (XV) PA 68 12 (A) VANPORT TOWNSHIP, SAFETY IMPROVEMENT 400,000 13 (BASE PROJECT ALLOCATION - $400,000) 14 (B) PA 68 CORRIDOR, BEAVER BOROUGH, 15 TRAFFIC SIGNAL IMPROVEMENT 90,000 16 (BASE PROJECT ALLOCATION - $90,000) 17 (XVI) S.R.3009 18 (A) KANE ROAD AT GRINGO ROAD, HOPEWELL 19 TOWNSHIP, SAFETY IMPROVEMENT 260,000 20 (BASE PROJECT ALLOCATION - $260,000) 21 (5) BEAVER AND LAWRENCE COUNTIES 22 (I) RIVER ROAD 23 (A) WIDENING AND RECONSTRUCTION BETWEEN 24 THE BOROUGH OF ELLWOOD CITY THROUGH 25 WAYNE TOWNSHIP AND NORTH SEWICKLEY 26 TOWNSHIP 70,000,000 27 (6) BEDFORD COUNTY 28 (I) S.R.0056 29 (A) IMPROVEMENTS FROM U.S.220 TO SOMERSET 30 COUNTY LINE, EAST ST. CLAIR AND WEST 19990H1023B3629 - 85 -
1 ST. CLAIR TOWNSHIPS 2,002,000 2 (BASE PROJECT ALLOCATION - $1,712,000) 3 (LAND ALLOCATION - $100,000) 4 (DESIGN AND CONTINGENCIES - $190,000) 5 (B) IMPROVEMENTS FROM CHESTNUT RIDGE 6 THROUGH DUNNINGS CREEK FISH HATCHERY, 7 LOWER PLEASANTVILLE MOUNTAIN AREAS 2,000,000 8 (BASE PROJECT ALLOCATION - $1,600,000) 9 (LAND ALLOCATION - $200,000) 10 (DESIGN AND CONTINGENCIES - $200,000) 11 (II) S.R.0030 12 (A) U.S.30 FROM CLIFFS TO WOLFSBURG, 13 PAVEMENT RESTORATION, BRIDGE 14 REHABILITATION AND SAFETY IMPROVEMENTS 350,000 15 (BASE PROJECT ALLOCATION - $300,000) 16 (DESIGN AND CONTINGENCIES - $50,000) 17 (B) U.S.30, INTERSECTION OF I-70 AND 18 S.R.1013 WITH U.S.30 EAST PROVIDENCE 19 TOWNSHIP, SAFETY IMPROVEMENT 26,000 20 (BASE PROJECT ALLOCATION - $23,000) 21 (LAND ALLOCATION - $1,000) 22 (DESIGN AND CONTINGENCIES - $2,000) 23 (C) U.S.30, INTERSECTION OF U.S.30 AND PA 24 56, BEDFORD TOWNSHIP, SAFETY 25 IMPROVEMENT 510,000 26 (BASE PROJECT ALLOCATION - $360,000) 27 (LAND ALLOCATION - $60,000) 28 (DESIGN AND CONTINGENCIES - $90,000) 29 (III) S.R.0070 30 (A) I-70 FROM PENNSYLVANIA TURNPIKE TO 19990H1023B3629 - 86 -
1 FULTON COUNTY LINE, PAVEMENT 2 RESTORATION, BRIDGE REHABILITATION AND 3 SAFETY IMPROVEMENTS 450,000 4 (BASE PROJECT ALLOCATION - $400,000) 5 (DESIGN AND CONTINGENCIES - $50,000) 6 (IV) S.R.0099 7 (A) I-99 FROM PENNSYLVANIA TURNPIKE TO 8 BLAIR COUNTY LINE, PAVEMENT 9 RESTORATION, BRIDGE REHABILITATION AND 10 SAFETY IMPROVEMENTS 1,450,000 11 (BASE PROJECT ALLOCATION - $1,400,000) 12 (DESIGN AND CONTINGENCIES - $50,000) 13 (V) S.R.0220 14 (A) U.S.220 FROM PENNSYLVANIA TURNPIKE 15 SOUTH TO END OF EXPRESSWAY, PAVEMENT 16 RESTORATION, BRIDGE REHABILITATION AND 17 SAFETY IMPROVEMENTS 350,000 18 (BASE PROJECT ALLOCATION - $300,000) 19 (DESIGN AND CONTINGENCIES - $50,000) 20 (VI) S.R.4009 21 (A) IMPROVEMENTS TO S.R.4009 IN THE 22 BEDFORD SPRINGS AREA, BEDFORD TOWNSHIP 200,000 23 (BASE PROJECT ALLOCATION - $180,000) 24 (LAND ALLOCATION - $5,000) 25 (DESIGN AND CONTINGENCIES - $15,000) 26 (VII) PA 915 27 (A) PA 26/PA 915 HOPEWELL INTERCHANGE, 28 HOPEWELL BOROUGH, INTERSECTION 29 IMPROVEMENT 265,000 30 (BASE PROJECT ALLOCATION - $200,000) 19990H1023B3629 - 87 -
1 (LAND ALLOCATION - $15,000) 2 (DESIGN AND CONTINGENCIES - $50,000) 3 (VIII) PA 26 4 (A) EVERETT BOROUGH SIGNAL UPGRADE, 5 EVERETT BOROUGH, SAFETY IMPROVEMENT 40,000 6 (BASE PROJECT ALLOCATION - $40,000) 7 (7) BERKS COUNTY 8 (I) S.R.0061 9 (A) SAFETY IMPROVEMENTS FROM S.R.3055 TO 10 S.R.4017, LEESPORT AREA 2,000,000 11 (BASE PROJECT ALLOCATION - $1,800,000) 12 (LAND ALLOCATION - $100,000) 13 (DESIGN AND CONTINGENCIES - $100,000) 14 (B) S.R.0012 TO S.R.0222, WIDEN HIGHWAY 15 AND REPLACE EXISTING RAILROAD OVERPASS 16 IN MUHLENBERG TOWNSHIP 25,000,000 17 (BASE PROJECT ALLOCATION - $21,125,000) 18 (LAND ALLOCATION - $7,500,000) 19 (DESIGN AND CONTINGENCIES - $3,750,000) 20 (C) S.R.0061 FROM HAMBURG TO SCHUYLKILL 21 COUNTY LINE, PAVEMENT RESTORATION, 22 BRIDGE REHABILITATION AND SAFETY 23 IMPROVEMENTS 350,000 24 (BASE PROJECT ALLOCATION - $300,000) 25 (DESIGN AND CONTINGENCIES - $50,000) 26 (II) S.R.0183 27 (A) INTERCHANGE WITH S.R.3055, 28 INSTALLATION OF SIGNALS 100,000 29 (BASE PROJECT ALLOCATION - $70,000) 30 (LAND ALLOCATION - $10,000) 19990H1023B3629 - 88 -
1 (DESIGN AND CONTINGENCIES - $20,000) 2 (B) INTERCHANGE WITH S.R.0012, WIDEN 3 BRIDGE AND RECONSTRUCT INTERCHANGE IN 4 CITY OF READING 20,000,000 5 (BASE PROJECT ALLOCATION - $11,000,000) 6 (LAND ALLOCATION - $6,000,000) 7 (DESIGN AND CONTINGENCIES - $3,000,000) 8 (C) INTERCHANGE WITH S.R.0222, WIDEN 9 BRIDGE AND RECONSTRUCT INTERCHANGE IN 10 BERN TOWNSHIP 20,000,000 11 (BASE PROJECT ALLOCATION - $13,000,000) 12 (LAND ALLOCATION - $4,000,000) 13 DESIGN AND CONTINGENCIES - $3,000,000) 14 (III) S.R.3021 15 (A) WIDEN TO 5 LANES AND SIGNAL 16 IMPROVEMENTS BETWEEN BROADCASTING ROAD 17 AND VAN REED ROAD, SPRING TOWNSHIP 3,100,000 18 (BASE PROJECT ALLOCATION - $2,900,000) 19 (DESIGN AND CONTINGENCIES - $200,000) 20 (IV) S.R.3040 21 (A) PARK ROAD INTERCHANGES WITH VAN REED 22 ROAD AND BROADCASTING ROAD 4,850,000 23 (BASE PROJECT ALLOCATION - $3,500,000) 24 (LAND ALLOCATION - $600,000) 25 (DESIGN AND CONTINGENCIES - $750,000) 26 (B) CONSTRUCTION OF NEW NORTHBOUND ON-RAMP 27 AND OFF-RAMP SYSTEM FROM S.R.3040 TO 28 BROADCASTING ROAD, SPRING TOWNSHIP 2,900,000 29 (BASE PROJECT ALLOCATION - $2,200,000) 30 (LAND ALLOCATION - $250,000) 19990H1023B3629 - 89 -
1 (DESIGN AND CONTINGENCIES - $450,000) 2 (V) S.R.0012 3 (A) S.R.0012 FROM S.R.0185 TO HYDE VILLA 4 BUSINESS ROUTE 222, PAVEMENT 5 RESTORATION, BRIDGE REHABILITATION AND 6 SAFETY IMPROVEMENTS 250,000 7 (BASE PROJECT ALLOCATION - $200,000) 8 (DESIGN AND CONTINGENCIES - $50,000) 9 (VI) S.R.0078 10 (A) I-78 FROM LEBANON COUNTY LINE TO 11 LEHIGH COUNTY LINE PAVEMENT 12 RESTORATION, BRIDGE REHABILITATION AND 13 SAFETY IMPROVEMENTS 3,550,000 14 (BASE PROJECT ALLOCATION - $3,500,000) 15 (DESIGN AND CONTINGENCIES - $50,000) 16 (B) I-78, EXIT 11 TO MILEPOST 33, WINDSOR 17 AND GREENWICH TOWNSHIPS, PATCHING, 18 GRINDING, RUMBLE STRIPS 207,000 19 (BASE PROJECT ALLOCATION - $207,000) 20 (VII) S.R.0100 21 (A) S.R.0100 FROM MONTGOMERY COUNTY LINE 22 TO SWAMP CREEK ROAD, PAVEMENT 23 RESTORATION, BRIDGE REHABILITATION AND 24 SAFETY IMPROVEMENTS 150,000 25 (BASE PROJECT ALLOCATION - $100,000) 26 (DESIGN AND CONTINGENCIES - $50,000) 27 (VIII) S.R.0176 28 (A) I-176 FROM PENNSYLVANIA TURNPIKE TO 29 U.S.422, PAVEMENT RESTORATION, BRIDGE 30 REHABILITATION AND SAFETY IMPROVEMENTS 1,150,000 19990H1023B3629 - 90 -
1 (BASE PROJECT ALLOCATION - $1,100,000) 2 (DESIGN AND CONTINGENCIES - $50,000) 3 (B) I-76/PA 724 INTERCHANGE IMPROVEMENT 650,000 4 (IX) S.R.0222 5 (A) U.S.222 FROM JUNCTION U.S.422 TO NORTH 6 OF TEMPLE, PAVEMENT RESTORATION, BRIDGE 7 REHABILITATION AND SAFETY IMPROVEMENTS 850,000 8 (BASE PROJECT ALLOCATION - $800,000) 9 (DESIGN AND CONTINGENCIES - $50,000) 10 (B) U.S.222 FROM KEMPVILLE TO S.R.8015, 11 PAVEMENT RESTORATION, BRIDGE 12 REHABILITATION AND SAFETY IMPROVEMENTS 450,000 13 (BASE PROJECT ALLOCATION - $400,000) 14 (DESIGN AND CONTINGENCIES - $50,000) 15 (X) S.R.0422 16 (A) S.R.0422 FROM S.R.8048 TO WYOMISSING, 17 PAVEMENT RESTORATION, BRIDGE 18 REHABILITATION AND SAFETY IMPROVEMENTS 950,000 19 (BASE PROJECT ALLOCATION - $900,000) 20 (DESIGN AND CONTINGENCIES - $50,000) 21 (B) S.R.0422 FROM MONTGOMERY COUNTY LINE 22 TO DOUGLASSVILLE, PAVEMENT RESTORATION, 23 BRIDGE REHABILITATION AND SAFETY 24 IMPROVEMENTS 250,000 25 (BASE PROJECT ALLOCATION - $200,000) 26 (DESIGN AND CONTINGENCIES - $50,000) 27 (8) BLAIR COUNTY 28 (I) S.R.0036 29 (A) CONSTRUCTION OF TURN LANES AT 30 INTERSECTIONS OF LOGAN BOULEVARD WITH 19990H1023B3629 - 91 -
1 PLANK ROAD AND 6TH AVENUE, CITY OF 2 ALTOONA 260,000 3 (BASE PROJECT ALLOCATION - $160,000) 4 (LAND ALLOCATION - $40,000) 5 (DESIGN AND CONTINGENCIES - $60,000) 6 (II) S.R.0866 7 (A) WIDENING AND IMPROVEMENTS BETWEEN 8 U.S.22 AND MARTINSBURG 2,960,000 9 (BASE PROJECT ALLOCATION - $2,400,000) 10 (LAND ALLOCATION - $500,000) 11 (DESIGN AND CONTINGENCIES - $60,000) 12 (B) PA 866 FROM CURRYVILLE TO ROYER, 13 HUSTON AND NORTH WOODBURY TOWNSHIPS, 14 RESTORATION 550,000 15 (BASE PROJECT ALLOCATION - $200,000) 16 (LAND ALLOCATION - $50,000) 17 (DESIGN AND CONTINGENCIES - $300,000) 18 (III) S.R.4004 19 (A) WIDEN, RECONSTRUCTION AND INTERSECTION 20 IMPROVEMENTS FROM PLANK ROAD TO RUSKIN 21 STREET 612,000 22 (BASE PROJECT ALLOCATION - $334,000) 23 (LAND ALLOCATION - $233,000) 24 (DESIGN AND CONTINGENCIES - $45,000) 25 (B) LOGAN VALLEY MALL TO 58TH STREET, 26 ALLEGHENY TOWNSHIP AND CITY OF ALTOONA, 27 RECONSTRUCTION 570,000 28 (BASE PROJECT ALLOCATION - $400,000) 29 (LAND ALLOCATION - $80,000) 30 (DESIGN AND CONTINGENCIES - $90,000) 19990H1023B3629 - 92 -
1 (IV) S.R.4004 AND S.R.4006 2 (A) WIDEN, RECONSTRUCTION AND INTERSECTION 3 IMPROVEMENTS GOODS LANE TO PA 764 601,000 4 (BASE PROJECT ALLOCATION - $353,000) 5 (LAND ALLOCATION - $200,000) 6 (DESIGN AND CONTINGENCIES - $48,000) 7 (V) S.R.4013 8 (A) NORTH ALTOONA ACCESS, SECOND STREET TO 9 PINECROFT, LOGAN TOWNSHIP AND ANTIS 10 TOWNSHIP 25,300,000 11 (BASE PROJECT ALLOCATION - $20,000,000) 12 (LAND ALLOCATION - $2,000,000) 13 (DESIGN AND CONTINGENCIES - $3,300,000) 14 (VI) S.R.4029 15 (A) IMPROVEMENTS FROM S.R.4027 TO ALONG 16 S.R.4029, TYRONE BOROUGH 650,000 17 (BASE PROJECT ALLOCATION - $500,000) 18 (LAND ALLOCATION - $50,000) 19 (DESIGN AND CONTINGENCIES - $100,000 20 (VII) NINTH AVENUE 21 (A) EXTENSION OF NINTH AVENUE AS FOUR-LANE 22 ROADWAY BETWEEN SEVENTH STREET AND 23 TWELFTH STREET 12,000,000 24 (BASE PROJECT ALLOCATION - $6,000,000) 25 (LAND ALLOCATION - $6,000,000) 26 (VIII) S.R.0099 27 (A) I-99 FROM BEDFORD COUNTY LINE TO 28 U.S.220, PAVEMENT RESTORATION, BRIDGE 29 REHABILITATION AND SAFETY IMPROVEMENTS 3,750,000 30 (BASE PROJECT ALLOCATION - $3,700,000) 19990H1023B3629 - 93 -
1 (DESIGN AND CONTINGENCIES - $50,000) 2 (IX) S.R.0022 3 (A) U.S.22 FROM I-99 JUNCTION TO CAMBRIA 4 COUNTY LINE, PAVEMENT RESTORATION, 5 BRIDGE REHABILITATION AND SAFETY 6 IMPROVEMENTS 850,000 7 (BASE PROJECT ALLOCATION - $800,000) 8 (DESIGN AND CONTINGENCIES - $50,000) 9 (X) S.R.9900 10 (A) CONSTRUCTION OF PARK AVENUE EXTENSION 11 FROM 17TH STREET TO FRANKSTOWN ROAD 900,000 12 (BASE PROJECT ALLOCATION - $700,000) 13 (LAND ALLOCATION - $100,000) 14 (DESIGN AND CONTINGENCIES - $100,000) 15 (B) S.R.9900, PARK AVENUE/SIXTH STREET 16 EXTENSION, NEW ROADWAY 800,000 17 (BASE PROJECT ALLOCATION - $600,000) 18 (LAND ALLOCATION - $100,000) 19 (DESIGN AND CONTINGENCIES - $100,000) 20 (XI) S.R.4010 21 (A) 17TH STREET EXIT OF I-99 TO PA 36, 22 LOGAN TOWNSHIP, NEW ROADWAY 760,000 23 (BASE PROJECT ALLOCATION - $500,000) 24 (LAND ALLOCATION - $100,000) 25 (DESIGN AND CONTINGENCIES - $160,000) 26 (9) BRADFORD COUNTY 27 (I) S.R.0220 28 (A) U.S.220 FROM DUNN ROAD TO HEMLOCK RUN 29 ROAD, PAVEMENT RESTORATION, BRIDGE 30 REHABILITATION AND SAFETY IMPROVEMENTS 550,000 19990H1023B3629 - 94 -
1 (BASE PROJECT ALLOCATION - $500,000) 2 (DESIGN AND CONTINGENCIES - $50,000) 3 (B) U.S.220 FROM HILL ROAD TO NEW YORK 4 STATE LINE, PAVEMENT RESTORATION, 5 BRIDGE REHABILITATION AND SAFETY 6 IMPROVEMENTS 550,000 7 (BASE PROJECT ALLOCATION - $500,000) 8 (DESIGN AND CONTINGENCIES - $50,000) 9 (C) ALBANY TOWNSHIP, SULLIVAN/BRADFORD 10 COUNTY LINE TO VILLAGE OF SOUTH BRANCH 6,300,000 11 (BASE PROJECT ALLOCATION - $5,000,000) 12 (LAND ALLOCATION - $300,000) 13 (DESIGN AND CONTINGENCIES - $1,000,000) 14 (II) S.R.0706 15 (A) WYALUSING BOROUGH AND WYALUSING 16 TOWNSHIP, JUNCTION U.S.6 TO S.R.1004 15,000,000 17 (BASE PROJECT ALLOCATION - $12,000,000) 18 (LAND ALLOCATION - $1,000,000) 19 (DESIGN AND CONTINGENCIES - $2,000,000) 20 (B) WYALUSING BOROUGH TO SUSQUEHANNA 21 COUNTY LINE, WYALUSING AND STEVENS 22 TOWNSHIPS, RESTORATION AND WIDENING 1,500,000 23 (BASE PROJECT ALLOCATION - $1,300,000) 24 (LAND ALLOCATION - $20,000) 25 (DESIGN AND CONTINGENCIES - $180,000) 26 (III) S.R.0014 27 (A) BOROUGH OF TROY, FALLBROOK ROAD, 28 S.R.3032 TO MAIN STREET S.R.0006 390,000 29 (BASE PROJECT ALLOCATION - $240,000) 30 (LAND ALLOCATION - $30,000) 19990H1023B3629 - 95 -
1 (DESIGN AND CONTINGENCIES - $120,000) 2 (IV) S.R.0006 3 (A) STANDING STONE TOWNSHIP, T-610 RIVER 4 ROAD TO T-580 TRACY ROAD 7,150,000 5 (BASE PROJECT ALLOCATION - $6,000,000) 6 (LAND ALLOCATION - $150,000) 7 (DESIGN AND CONTINGENCIES - $1,000,000) 8 (B) U.S.6 FROM WYSOX NARROWS TO 9 RUMMERFIELD, RECONSTRUCTION AND 10 WIDENING 381,000 11 (BASE PROJECT ALLOCATION - $194,000) 12 (LAND ALLOCATION - $30,000) 13 (DESIGN AND CONTINGENCIES - $157,000) 14 (C) U.S. 6 FROM THE TIOGA/BEDFORD COUNTY 15 LINE EAST TO SYLVANIA, RECONSTRUCTION 16 AND WIDENING 591,000 17 (BASE PROJECT ALLOCATION - $411,000) 18 (LAND ALLOCATION - $20,000) 19 (DESIGN AND CONTINGENCIES - $160,000) 20 (10) BUCKS COUNTY 21 (I) S.R.0001 22 (A) U.S.1 FROM NEW JERSEY STATE LINE TO 23 PHILADELPHIA COUNTY LINE, PAVEMENT 24 RESTORATION, BRIDGE REHABILITATION AND 25 SAFETY IMPROVEMENTS 1,450,000 26 (BASE PROJECT ALLOCATION - $1,400,000) 27 (DESIGN AND CONTINGENCIES - $50,000) 28 (II) S.R.0013 29 (A) U.S.13 FROM TULLYTOWN TO JUNCTION 30 U.S.1, PAVEMENT RESTORATION, BRIDGE 19990H1023B3629 - 96 -
1 REHABILITATION AND SAFETY IMPROVEMENTS 450,000 2 (BASE PROJECT ALLOCATION - $400,000) 3 (DESIGN AND CONTINGENCIES - $50,000) 4 (III) S.R.0095 5 (A) I-95 FROM PHILADELPHIA COUNTY LINE TO 6 NEW JERSEY, PAVEMENT RESTORATION, 7 BRIDGE REHABILITATION AND SAFETY 8 IMPROVEMENTS 1,850,000 9 (BASE PROJECT ALLOCATION - $1,800,000) 10 (DESIGN AND CONTINGENCIES - $50,000) 11 (IV) S.R.0202 12 (A) U.S.202 FROM S.R.3002 TO PA 611, 13 DOYLESTOWN, PAVEMENT RESTORATION, 14 BRIDGE REHABILITATION AND SAFETY 15 IMPROVEMENTS 250,000 16 (BASE PROJECT ALLOCATION - $200,000) 17 (DESIGN AND CONTINGENCIES - $50,000) 18 (V) S.R.0309 19 (A) S.R.0309 FROM MONTGOMERY COUNTY LINE 20 TO RICH HILL, PAVEMENT RESTORATION, 21 BRIDGE REHABILITATION AND SAFETY 22 IMPROVEMENTS 850,000 23 (BASE PROJECT ALLOCATION - $800,000) 24 (DESIGN AND CONTINGENCIES - $50,000) 25 (VI) S.R.0611 26 (A) S.R.0611 FROM BRIDGEPOINT TO 27 DYERSTOWN, PAVEMENT RESTORATION, BRIDGE 28 REHABILITATION AND SAFETY IMPROVEMENTS 550,000 29 (BASE PROJECT ALLOCATION - $500,000) 30 (DESIGN AND CONTINGENCIES - $50,000) 19990H1023B3629 - 97 -
1 (VII) S.R.2038 2 (A) COUNTY LINE ROAD EXTENSION FROM 3 BUSTLETON TO PHILMONT AVENUE, LOWER 4 SOUTHAMPTON TOWNSHIP 2,080,000 5 (BASE PROJECT ALLOCATION - $2,000,000) 6 (LAND ALLOCATION - $20,000) 7 (DESIGN AND CONTINGENCIES - $60,000) 8 (VIII) PA 132 9 (A) STREET ROAD (PA 132) AND I-95 10 INTERCHANGE, BENSALEM TOWNSHIP, 11 INTERCHANGE IMPROVEMENTS 4,800,000 12 (BASE PROJECT ALLOCATION - $4,000,000) 13 (LAND ALLOCATION - $400,000) 14 (DESIGN AND CONTINGENCIES - $400,000) 15 (IX) S.R.2006 16 (A) INTERSECTION OF NEW FALLS ROAD 17 (S.R.2006) AND WISTAR ROAD, 18 INTERSECTION IMPROVEMENTS 120,000 19 (BASE PROJECT ALLOCATION - $100,000) 20 (DESIGN AND CONTINGENCIES - $20,000) 21 (X) S.R. 2022 22 (A) S.R.2022 FROM PA 413 TO STREET ROAD 23 (PA 132) INTERSECTION, INTERSECTION 24 IMPROVEMENTS 120,000 25 (BASE PROJECT ALLOCATION - $100,000) 26 (DESIGN AND CONTINGENCIES - $20,000) 27 (XI) S.R.2025 28 (A) S.R.2025 FROM HULMEVILLE ROAD TO OLD 29 LINCOLN HIGHWAY, BENSALEM TOWNSHIP, 30 INTERSECTION IMPROVEMENTS 1,251,000 19990H1023B3629 - 98 -
1 (BASE PROJECT ALLOCATION - $450,000) 2 (LAND ALLOCATION - $250,000) 3 (DESIGN AND CONTINGENCIES - $551,000) 4 (XII) S.R.2029 5 (A) S.R.2029, INTERSECTION OF OXFORD 6 VALLEY ROAD AND LEVITTOWN PARKWAY, 7 FALLS AND MIDDLETOWN TOWNSHIPS, 8 INTERSECTION IMPROVEMENTS 1,060,000 9 (BASE PROJECT ALLOCATION - $760,000) 10 (LAND ALLOCATION - $300,000) 11 (B) S.R.2029, OXFORD VALLEY ROAD AT U.S.1 12 INTERCHANGE, LOWER MAKEFIELD TOWNSHIP, 13 INTERCHANGE IMPROVEMENTS 375,000 14 (BASE PROJECT ALLOCATION - $375,000) 15 (XIII) S.R.2069 16 (A) S.R.2069 FROM HEACOCK TO OXFORD VALLEY 17 ROAD, LOWER MAKEFIELD TOWNSHIP, 18 REALIGNMENT 500,000 19 (BASE PROJECT ALLOCATION - $500,000) 20 (XIV) S.R.2002 21 (A) STORM WATER DRAINAGE 22 PROJECT/RECONSTRUCTION ON STATE ROAD 23 FROM ELM AVENUE TO THE NESHAMINY CREEK, 24 CROYDON, BRISTOL TOWNSHIP 2,000,000 25 (BASE PROJECT ALLOCATION - $1,750,000) 26 (DESIGN AND CONTINGENCIES - $250,000) 27 (11) BUTLER COUNTY 28 (I) S.R.0079 29 (A) I-79 FROM ALLEGHENY COUNTY LINE TO 30 LAWRENCE COUNTY LINE, PAVEMENT 19990H1023B3629 - 99 -
1 RESTORATION, BRIDGE REHABILITATION AND 2 SAFETY IMPROVEMENTS 2,750,000 3 (BASE PROJECT ALLOCATION - $2,700,000) 4 (DESIGN AND CONTINGENCIES - $50,000) 5 (B) I-79, FROM ALLEGHENY COUNTY LINE TO 6 LAWRENCE COUNTY LINE, COUNTYWIDE 7 ROADWAY AND SAFETY IMPROVEMENTS 4,040,000 8 (BASE PROJECT ALLOCATION - $4,000,000) 9 (DESIGN AND CONTINGENCIES - $40,000) 10 (II) S.R.0080 11 (A) I-80 FROM CLARION COUNTY LINE TO 12 VENANGO COUNTY LINE, PAVEMENT 13 RESTORATION, BRIDGE REHABILITATION AND 14 SAFETY IMPROVEMENTS 250,000 15 (BASE PROJECT ALLOCATION - $200,000) 16 (DESIGN AND CONTINGENCIES - $50,000) 17 (III) S.R.0422 18 (A) U.S.422 FROM OLD 422 EAST TO I-79 19 INTERCHANGE, PAVEMENT RESTORATION, 20 BRIDGE REHABILITATION AND SAFETY 21 IMPROVEMENTS 1,350,000 22 (BASE PROJECT ALLOCATION - $1,300,000) 23 (DESIGN AND CONTINGENCIES - $50,000) 24 (IV) S.R.0019 AND S.R.0528 25 (A) WIDEN S.R.0019 AND S.R.0528 AND 26 INSTALL NEW SIGNALIZATION AT 27 INTERSECTION OF S.R.0019 AND S.R.0528, 28 JACKSON TOWNSHIP 1,783,000 29 (BASE PROJECT ALLOCATION - $1,550,000) 30 (DESIGN AND CONTINGENCIES - $233,000) 19990H1023B3629 - 100 -
1 (V) PA 228 2 (A) INTERSECTION OF PA 228/S.R.2007/T-840, 3 CLINTON TOWNSHIP, INTERSECTION 4 IMPROVEMENTS 340,000 5 (BASE CONSTRUCTION ALLOCATION - 6 $140,000) 7 (LAND ALLOCATION - $50,000) 8 (DESIGN AND CONTINGENCIES - $150,000) 9 (B) PA 228, INTERSECTIONS AT S.R.2007 AND 10 T-840, CLINTON TOWNSHIP, SAFETY 11 IMPROVEMENT 187,000 12 (BASE PROJECT ALLOCATION - $140,000) 13 (LAND ALLOCATION - $10,000) 14 (DESIGN AND CONTINGENCIES - $37,000) 15 (VI) WETLAND BANKING 16 (A) COUNTYWIDE RECONSTRUCTION OF WETLAND 17 BANKING 80,000 18 (BASE PROJECT ALLOCATION - $40,000) 19 (LAND ALLOCATION - $20,000) 20 (DESIGN AND CONTINGENCIES - $20,000) 21 (VII) U.S.19 22 (A) ZELIENOPLE BOROUGH AND JACKSON 23 TOWNSHIP, TRAFFIC STUDY 695,000 24 (BASE PROJECT ALLOCATION - $600,000) 25 (LAND ALLOCATION - $20,000) 26 (DESIGN AND CONTINGENCIES - $75,000) 27 (VIII) PA 68 28 (A) EVANS CITY BOROUGH, TRAFFIC SIGNAL 29 IMPROVEMENT 82,000 30 (BASE PROJECT ALLOCATION - $60,000) 19990H1023B3629 - 101 -
1 (LAND ALLOCATION - $1,000) 2 (DESIGN AND CONTINGENCIES - $21,000) 3 (IX) PA 356 4 (A) PA 356, BUFFALO TOWNSHIP, INTERSECTION 5 OF PA 356 AND S.R.2018 (SARVER ROAD), 6 RECONSTRUCTION 151,000 7 (BASE PROJECT ALLOCATION - $90,000) 8 (LAND ALLOCATION - $25,000) 9 (DESIGN AND CONTINGENCIES - $36,000) 10 (X) PA 288 11 (A) ZELIENOPLE BOROUGH, INTERSECTION OF PA 12 288 AND PA 588, SAFETY IMPROVEMENTS 151,000 13 (BASE PROJECT ALLOCATION - $100,000) 14 (LAND ALLOCATION - $15,000) 15 (DESIGN AND CONTINGENCIES - $36,000) 16 (XI) S.R.8002 17 (A) MUDDY CREEK TOWNSHIP, INTERSECTION OF 18 S.R.8002 AND U.S.422, NEW INTERCHANGE 304,000 19 (BASE PROJECT ALLOCATION - $240,000) 20 (LAND ALLOCATION - $4,000) 21 (DESIGN AND CONTINGENCIES - $60,000) 22 (12) CAMBRIA COUNTY 23 (I) S.R.0022 24 (A) CONCRETE REHABILITATION FROM EBENSBURG 25 TO BLAIR COUNTY LINE, CRESSON, MUNSTER 26 AND CAMBRIA TOWNSHIPS 1,150,000 27 (BASE PROJECT ALLOCATION - $1,100,000) 28 (DESIGN AND CONTINGENCIES - $50,000) 29 (B) U.S.22 FROM PA 271 MUNDYS CORNER TO 1 30 MILE WEST, PAVEMENT RESTORATION, BRIDGE 19990H1023B3629 - 102 -
1 REHABILITATION AND SAFETY IMPROVEMENTS 150,000 2 (BASE PROJECT ALLOCATION - $100,000) 3 (DESIGN AND CONTINGENCIES - $50,000) 4 (C) U.S.22 EBENSBURG AREA, CAMBRIA 5 TOWNSHIP, SAFETY IMPROVEMENTS 2,150,000 6 (BASE PROJECT ALLOCATION - $1,600,000) 7 (LAND ALLOCATION - $400,000) 8 (DESIGN AND CONTINGENCIES - $150,000) 9 (D) U.S.22 FROM INTERSECTION WITH U.S.219 10 TO BLAIR COUNTY LINE, RESTORATION 2,220,000 11 (BASE PROJECT ALLOCATION - $2,000,000) 12 (LAND ALLOCATION - $20,000) 13 (DESIGN AND CONTINGENCIES - $200,000) 14 (II) S.R.0056 15 (A) S.R.0056 FROM U.S.219 TO JOHNSTOWN, 16 PAVEMENT RESTORATION, BRIDGE 17 REHABILITATION AND SAFETY IMPROVEMENTS 750,000 18 (BASE PROJECT ALLOCATION - $700,000) 19 (DESIGN AND CONTINGENCIES - $50,000) 20 (B) PA 56 FROM BROAD AVENUE TO U.S.22, 21 CITY OF JOHNSTOWN, RELOCATION 1,000,000 22 (DESIGN AND CONTINGENCIES - $1,000,000) 23 (C) PA 56, WIDMAN ROCKFALL FENCE, 24 STONYCREEK TOWNSHIP, SAFETY 25 IMPROVEMENT 205,000 26 (BASE PROJECT ALLOCATION - $180,000) 27 (LAND ALLOCATION - $5,000) 28 (DESIGN AND CONTINGENCIES - $20,000) 29 (D) PA 56, U.S.219 TO WIDMAN STREET, 30 RICHLAND TOWNSHIP, RESTORATION 460,000 19990H1023B3629 - 103 -
1 (BASE PROJECT ALLOCATION - $400,000) 2 (LAND ALLOCATION - $20,000) 3 (DESIGN AND CONTINGENCIES - $40,000) 4 (III) S.R.0219 5 (A) U.S.219 FROM SOMERSET COUNTY LINE TO 6 S.R.4031 INTERCHANGE, PAVEMENT 7 RESTORATION, BRIDGE REHABILITATION AND 8 SAFETY IMPROVEMENTS 2,650,000 9 (BASE PROJECT ALLOCATION - $2,600,000) 10 (DESIGN AND CONTINGENCIES - $50,000) 11 (B) U.S.219, FROM U.S.22 TO U.S.422, 12 CAMBRIA TOWNSHIP, RESTORATION 560,000 13 (BASE PROJECT ALLOCATION - $560,000) 14 (IV) S.R.0271 15 (A) PERGRIM HILL TWIN LANE WITH SHOEMAKER 16 STREET, JACKSON TOWNSHIP 680,000 17 (BASE PROJECT ALLOCATION - $480,000) 18 (LAND ALLOCATION - $140,000) 19 (DESIGN AND CONTINGENCIES - $60,000) 20 (B) PA 271, SHOEMAKER STREET, JACKSON 21 TOWNSHIP, WIDENING AND ADD TURN LANE 3,599,000 22 (BASE PROJECT ALLOCATION - $2,400,000) 23 (LAND ALLOCATION - $799,000) 24 (DESIGN AND CONTINGENCIES - $400,000) 25 (C) PA 271, MAPLE AND CLINTON STREETS, 26 CITY OF JOHNSTOWN, SAFETY IMPROVEMENT 363,000 27 (BASE PROJECT ALLOCATION - $300,000) 28 (LAND ALLOCATION - $23,000) 29 (DESIGN AND CONTINGENCIES - $40,000) 30 (V) S.R.4021 19990H1023B3629 - 104 -
1 (A) S.R.4021 FROM U.S.219 TO HASTINGS 2 ACCESS ROAD, SUSQUEHANNA TOWNSHIP, 3 RECONSTRUCTION AND REALIGNMENT 827,000 4 (BASE PROJECT ALLOCATION - $672,000) 5 (LAND ALLOCATION - $90,000) 6 (DESIGN AND CONTINGENCIES - $65,000) 7 (VI) PA 756 8 (A) U.S.219 TO SCALP AVENUE, GEISTOWN AND 9 RICHLAND TOWNSHIP, RESTORATION 710,000 10 (BASE PROJECT ALLOCATION - $400,000) 11 (LAND ALLOCATION - $190,000) 12 (DESIGN AND CONTINGENCIES - $120,000) 13 (VII) PA 53 14 (A) INTERSECTION WITH PA 36, ASHVILLE 15 BOROUGH, INTERSECTION IMPROVEMENT 280,000 16 (BASE PROJECT ALLOCATION - $200,000) 17 (LAND ALLOCATION - $40,000) 18 (DESIGN AND CONTINGENCIES - $40,000) 19 (VIII) U.S.422 20 (A) CAMBRIA AND BLACKLICK TOWNSHIPS, 21 RECONSTRUCTION 920,000 22 (BASE PROJECT ALLOCATION - $700,000) 23 (LAND ALLOCATION - $20,000) 24 (DESIGN AND CONTINGENCIES - $200,000) 25 (13) CARBON COUNTY 26 (I) S.R.0080 27 (A) I-80 FROM MONROE COUNTY LINE TO 28 LUZERNE COUNTY LINE, PAVEMENT 29 RESTORATION, BRIDGE REHABILITATION AND 30 SAFETY IMPROVEMENTS 1,050,000 19990H1023B3629 - 105 -
1 (BASE PROJECT ALLOCATION - $1,000,000) 2 (DESIGN AND CONTINGENCIES - $50,000) 3 (II) S.R.0248 4 (A) S.R.0248 FROM NORTHAMPTON COUNTY LINE 5 TO LEHIGHTON, PAVEMENT RESTORATION, 6 BRIDGE REHABILITATION AND SAFETY 7 IMPROVEMENTS 750,000 8 (BASE PROJECT ALLOCATION - $700,000) 9 (DESIGN AND CONTINGENCIES - $50,000) 10 (III) S.R.0054 11 (A) S CURVES, SAFETY IMPROVEMENTS 5,000,000 12 (BASE PROJECT ALLOCATION - $4,500,000) 13 (LAND ALLOCATION - $250,000) 14 (DESIGN AND CONTINGENCIES - $250,000) 15 (14) CENTRE COUNTY 16 (I) S.R.0080 17 (A) I-80 FROM CLINTON COUNTY LINE TO 18 CLEARFIELD COUNTY LINE, PAVEMENT 19 RESTORATION, BRIDGE REHABILITATION AND 20 SAFETY IMPROVEMENTS 3,350,000 21 (BASE PROJECT ALLOCATION - $3,300,000) 22 (DESIGN AND CONTINGENCIES - $50,000) 23 (II) S.R.0322 24 (A) BOALSBURG TO BEAR MEADOWS ROAD, HARRIS 25 TOWNSHIP 150,000 26 (BASE PROJECT ALLOCATION - $90,000) 27 (LAND ALLOCATION - $10,000) 28 (DESIGN AND CONTINGENCIES - $50,000) 29 (B) IMPROVEMENTS TO S.R.0322 AT WADDLE 30 ROAD, WIDENING OF WADDLE ROAD FROM 19990H1023B3629 - 106 -
1 S.R.0322 TO CLEARVIEW ROAD, PATTON 2 TOWNSHIP 5,000,000 3 (BASE PROJECT ALLOCATION - $4,000,000) 4 (LAND ALLOCATION - $300,000) 5 (DESIGN AND CONTINGENCIES - $700,000) 6 (C) WIDEN TO 5 LANES BETWEEN PARK FOREST 7 DRIVE AND DOUGLAS DRIVE, PATTON 8 TOWNSHIP 3,000,000 9 (BASE PROJECT ALLOCATION - $2,500,000) 10 (LAND ALLOCATION - $200,000) 11 (DESIGN AND CONTINGENCIES - $300,000) 12 (D) U.S.322 FROM BOALSBURG TO SCOTIA ROAD, 13 PAVEMENT RESTORATION, BRIDGE 14 REHABILITATION AND SAFETY IMPROVEMENTS 1,050,000 15 (BASE PROJECT ALLOCATION - $1,000,000) 16 (DESIGN AND CONTINGENCIES - $50,000) 17 (E) U.S.322 FROM JACK'S MILL DRIVE TO BEAR 18 ROAD, HARRIS TOWNSHIP, LEFT TURN LANES 290,000 19 (BASE PROJECT ALLOCATION - $200,000) 20 (LAND ALLOCATION - $20,000) 21 (DESIGN AND CONTINGENCIES - $70,000) 22 (III) S.R.0026 23 (A) WIDEN WEST COLLEGE AVENUE, S.R.0026 7,260,000 24 (BASE PROJECT ALLOCATION - $6,180,000) 25 (LAND ALLOCATION - $180,000) 26 (DESIGN AND CONTINGENCIES - $900,000) 27 (IV) T-355 28 (A) EXTENSION OF OLD GATESBURG ROAD 1,770,000 29 (BASE PROJECT ALLOCATION - $1,290,000) 30 (LAND ALLOCATION - $350,000) 19990H1023B3629 - 107 -
1 (DESIGN AND CONTINGENCIES - $130,000) 2 (V) INTERSECTION OF S.R.0550 AND S.R.3008 3 (A) IMPROVEMENT TO THE INTERSECTION OF 4 ROUTES 550 AND 3008 TO ENHANCE SIGHT 5 DISTANCE AND REMOVE ACCIDENT PROBLEM 6 AREA, SAFETY AND MOBILITY INITIATIVE 7 (SAMI), BENNER TOWNSHIP 213,000 8 (BASE PROJECT ALLOCATION -$103,000) 9 (LAND ALLOCATION - $10,000) 10 (DESIGN AND CONTINGENCIES - $100,000 11 (VI) S.R.0099 12 (A) UTILITY RELOCATION FROM S.C.I. 13 ROCKVIEW, BENNER TOWNSHIP 550,000 14 (BASE PROJECT ALLOCATION - $500,000) 15 (LAND ALLOCATION - $50,000) 16 (VII) WADDLE ROAD 17 (A) FROM ATHERTON STREET THROUGH U.S.322 18 INTERCHANGE, PATTON TOWNSHIP, 19 RECONSTRUCTION, WIDENING AND SAFETY 20 IMPROVEMENTS 500,000 21 (BASE PROJECT ALLOCATION - $400,000) 22 (LAND ALLOCATION - $50,000) 23 (DESIGN AND CONTINGENCIES - $50,000) 24 (15) CHESTER COUNTY 25 (I) S.R.0001 26 (A) U.S.1 FROM MARYLAND STATE LINE TO 27 KENNETT SQUARE, PAVEMENT RESTORATION, 28 BRIDGE REHABILITATION AND SAFETY 29 IMPROVEMENTS 2,150,000 30 (BASE PROJECT ALLOCATION - $2,100,000) 19990H1023B3629 - 108 -
1 (DESIGN AND CONTINGENCIES - $50,000) 2 (II) S.R.0030 3 (A) U.S.30 FROM JUNCTION U.S.202 TO 4 JUNCTION BUSINESS U.S.30, PAVEMENT 5 RESTORATION, BRIDGE REHABILITATION AND 6 SAFETY IMPROVEMENTS 1,850,000 7 (BASE PROJECT ALLOCATION - $1,800,000) 8 (DESIGN AND CONTINGENCIES - $50,000) 9 (III) S.R.0202 10 (A) U.S.202 FROM MONTGOMERY COUNTY LINE TO 11 WEST CHESTER, PAVEMENT RESTORATION, 12 BRIDGE REHABILITATION AND SAFETY 13 IMPROVEMENTS 1,750,000 14 (BASE PROJECT ALLOCATION - $1,700,000) 15 (DESIGN AND CONTINGENCIES - $50,000) 16 (IV) S.R.0422 17 (A) U.S.422 FROM U.S.202 TO MONTGOMERY 18 COUNTY LINE, PAVEMENT RESTORATION, 19 BRIDGE REHABILITATION AND SAFETY 20 IMPROVEMENTS 450,000 21 (BASE PROJECT ALLOCATION - $400,000) 22 (DESIGN AND CONTINGENCIES - $50,000) 23 (B) U.S.422, BERKS COUNTY LINE TO 24 SCHUYLKILL RIVER, RECONSTRUCTION 3,160,000 25 (BASE PROJECT ALLOCATION - $3,000,000) 26 (LAND ALLOCATION - $60,000) 27 (DESIGN AND CONTINGENCIES - $100,000) 28 (V) S.R.0100/S.R.2023 29 (A) S.R.0100/S.R.2023 FROM S.R.2022 TO 30 U.S.202, PAVEMENT RESTORATION, BRIDGE 19990H1023B3629 - 109 -
1 REHABILITATION AND SAFETY IMPROVEMENTS 250,000 2 (BASE PROJECT ALLOCATION - $200,000) 3 (DESIGN AND CONTINGENCIES - $50,000) 4 (B) PA 100/PA 113, INTERCHANGE AND ACCESS 5 IMPROVEMENTS 5,000,000 6 (BASE PROJECT ALLOCATION - $4,000,000) 7 (LAND ALLOCATION - $500,000) 8 (DESIGN AND CONTINGENCIES - $500,000) 9 (VI) S.R.9900 10 (A) RECONSTRUCTION OF KINGS ROW ROAD IN 11 NEW LONDON TOWNSHIP 100,000 12 (BASE PROJECT ALLOCATION - $100,000) 13 (VII) S.R.0252 14 (A) S.R.0252 AT THE INTERSECTION OF ROUTE 15 30, WIDEN RAIL UNDERPASS 17,000,000 16 (VIII) S.R.0029 17 (A) INTERSECTION IMPROVEMENTS ON S.R.0029 18 IN PHOENIXVILLE, CHARLESTOWN TOWNSHIP 1,750,000 19 (IX) S.R.0023 AND S.R.0029 20 (A) DESIGN AND CONSTRUCTION OF FRENCH 21 CREEK DRIVE CONNECTOR BETWEEN S.R.0023 22 AND S.R.0029, BOROUGH OF PHOENIXVILLE 7,360,000 23 (BASE PROJECT ALLOCATION - $6,400,000) 24 (DESIGN AND CONTINGENCIES - $960,000) 25 (X) S.R.0113 26 (A) RELOCATION OF S.R.0113 IN THE BOROUGH 27 OF PHOENIXVILLE 5,864,000 28 (BASE PROJECT ALLOCATION - $4,026,000) 29 (LAND ALLOCATION - $1,234,000) 30 (DESIGN AND CONTINGENCIES - $604,000) 19990H1023B3629 - 110 -
1 (XI) PA 252 2 (A) RECONSTRUCTION UNDER SEPTA RAIL 3 TRACKS 17,000,000 4 (BASE PROJECT ALLOCATION - $14,450,000) 5 (DESIGN AND CONTINGENCIES - $2,550,000) 6 (XII) WAGONTOWN ROAD 7 (A) WAGONTOWN ROAD FLOOD REPAIR, 8 RECONSTRUCTION AND RETAINING WALL 800,000 9 (BASE PROJECT ALLOCATION - $500,000) 10 (LAND ALLOCATION - $100,000) 11 (DESIGN AND CONTINGENCIES - $200,000) 12 (XIII) PA 926 13 (A) PA 26 AND NEW STREET INTERSECTION, 14 WESTTOWN TOWNSHIP, INTERSECTION 15 IMPROVEMENTS 83,000 16 (BASE PROJECT ALLOCATION - $72,000) 17 (DESIGN AND CONTINGENCIES - $11,000) 18 (XIV) FRENCH CREEK PARKWAY 19 (A) FRENCH CREEK PARKWAY, NEW ROADWAY 3,260,000 20 (BASE PROJECT ALLOCATION - $2,420,000) 21 (LAND ALLOCATION - $440,000) 22 (DESIGN AND CONTINGENCIES - $400,000) 23 (XV) S.R. 0100 24 (A) ROADWAY, SAFETY AND ACCESS 25 IMPROVEMENTS, UWCHLAN TOWNSHIP, IN THE 26 VICINITY OF PA 100 AND PA 113 3,000,000 27 (BASE PROJECT ALLOCATION - $2,600,000) 28 (LAND ALLOCATION - $200,000) 29 (DESIGN AND CONTINGENCIES - $200,000) 30 (16) CLARION COUNTY 19990H1023B3629 - 111 -
1 (I) S.R.0080 2 (A) I-80 WESTBOUND REHABILITATION BETWEEN 3 S.R.2007 AND WILLIAMSBURG, BEAVER, 4 PAINT AND MONROE TOWNSHIPS 464,000 5 (BASE PROJECT ALLOCATION - $464,000) 6 (B) I-80 FROM BUTLER COUNTY LINE TO 7 JEFFERSON COUNTY LINE, PAVEMENT 8 RESTORATION, BRIDGE REHABILITATION AND 9 SAFETY IMPROVEMENTS 2,850,000 10 (BASE PROJECT ALLOCATION - $2,800,000) 11 (DESIGN AND CONTINGENCIES - $50,000) 12 (C) PAVEMENT AND SAFETY IMPROVEMENTS TO 13 CLARION REST AREAS, WEIGHT STATIONS AND 14 CROSSOVERS 392,000 15 (BASE PROJECT ALLOCATION - $92,000) 16 (DESIGN AND CONTINGENCIES - $300,000) 17 (D) I-80, BUTLER COUNTY LINE, EAST TO 18 JEFFERSON COUNTY LINE, COUNTYWIDE ITS 19 SAFETY IMPROVEMENT 315,000 20 (BASE PROJECT ALLOCATION - $300,000) 21 (DESIGN AND CONTINGENCIES - $15,000) 22 (II) PA 68 23 (A) PA 68/U.S.322 INTERSECTION, CLARION 24 BOROUGH, INTERSECTION IMPROVEMENT 360,000 25 (BASE PROJECT ALLOCATION - $160,000) 26 (LAND ALLOCATION - $20,000) 27 (DESIGN AND CONTINGENCIES - $180,000) 28 (B) PA 68, FROM EXIT 9 TO MAIN STREET, 29 MONROE AND CLARION TOWNSHIPS, 30 RECONSTRUCTION 1,800,000 19990H1023B3629 - 112 -
1 (BASE PROJECT ALLOCATION - $1,600,000) 2 (LAND ALLOCATION - $100,000) 3 (DESIGN AND CONTINGENCIES - $100,000) 4 (C) INTERSECTION OF PA 68 AND S.R.3012, 5 TOBY TOWNSHIP, SAFETY IMPROVEMENT 287,000 6 (BASE PROJECT ALLOCATION - $190,000) 7 (LAND ALLOCATION - $40,000) 8 (DESIGN AND CONTINGENCIES - $57,000) 9 (D) INTERSECTION OF PA 68 AND U.S.322, 10 CLARION BOROUGH, SAFETY IMPROVEMENT 121,000 11 (BASE PROJECT ALLOCATION - $80,000) 12 (LAND ALLOCATION - $4,000) 13 (DESIGN AND CONTINGENCIES - $37,000) 14 (III) WETLAND BANKING 15 (A) COUNTYWIDE, RECONSTRUCTION OF WETLAND 16 BANKING 70,000 17 (BASE PROJECT ALLOCATION - $40,000) 18 (LAND ALLOCATION - $10,000) 19 (DESIGN AND CONTINGENCIES - $20,000) 20 (IV) U.S.322 21 (A) INTERSECTION OF U.S.322 AND PA 208, 22 SHIPPENVILLE BOROUGH, SAFETY 23 IMPROVEMENT 241,000 24 (BASE PROJECT ALLOCATION - $160,000) 25 (LAND ALLOCATION - $40,000) 26 (DESIGN AND CONTINGENCIES - $41,000) 27 (B) VENANGO COUNTY LINE TO T-890, ASHLAND 28 AND ELK TOWNSHIPS, SAFETY IMPROVEMENT 1,391,000 29 (BASE PROJECT ALLOCATION - $1,300,000) 30 (LAND ALLOCATION - $40,000) 19990H1023B3629 - 113 -
1 (DESIGN AND CONTINGENCIES - $51,000) 2 (17) CLEARFIELD COUNTY 3 (I) S.R.0080 4 (A) I-80 FROM CENTRE COUNTY LINE TO 5 JEFFERSON COUNTY LINE, PAVEMENT 6 RESTORATION, BRIDGE REHABILITATION AND 7 SAFETY IMPROVEMENTS 4,250,000 8 (BASE PROJECT ALLOCATION - $4,200,000) 9 (DESIGN AND CONTINGENCIES - $50,000) 10 (II) S.R.0879 11 (A) SAFETY IMPROVEMENTS, RECONSTRUCTION 12 AND NEW CONNECTOR ROAD, S.R.0879 AND 13 RIDGE AVENUE, S.R.3013, CURWENSVILLE 14 BOROUGH AND PIKE TOWNSHIP 4,000,000 15 (BASE PROJECT ALLOCATION - $3,500,000) 16 (LAND ALLOCATION - $150,000) 17 (DESIGN AND CONTINGENCIES - $350,000) 18 (18) CLINTON COUNTY 19 (I) S.R.1001 20 (A) IMPROVEMENTS FROM S.R.0664 TO QUEENS 21 RUN, VILLAGE OF LOCKPORT 1,230,000 22 (BASE PROJECT ALLOCATION - $1,100,000) 23 (LAND ALLOCATION - $90,000) 24 (DESIGN AND CONTINGENCIES - $40,000) 25 (II) S.R.0080 26 (A) I-80 FROM UNION COUNTY LINE TO CENTRE 27 COUNTY LINE, PAVEMENT RESTORATION, 28 BRIDGE REHABILITATION AND SAFETY 29 IMPROVEMENTS 2,450,000 30 (BASE PROJECT ALLOCATION - $2,400,000) 19990H1023B3629 - 114 -
1 (DESIGN AND CONTINGENCIES - $50,000) 2 (III) S.R.0220 3 (A) U.S.220 FROM LYCOMING COUNTY LINE TO 4 SALONA, PAVEMENT RESTORATION, BRIDGE 5 REHABILITATION AND SAFETY IMPROVEMENTS 1,450,000 6 (BASE PROJECT ALLOCATION - $1,400,000) 7 (DESIGN AND CONTINGENCIES - $50,000) 8 (IV) NEW ROAD CONSTRUCTION 9 (A) NEW ROAD CONSTRUCTION FROM ROUTE 220 10 INTO AVIS INDUSTRIAL PARK, PINE CREEK 11 TOWNSHIP 5,350,000 12 (BASE PROJECT ALLOCATION - $4,500,000) 13 (LAND ALLOCATION - $200,000) 14 (DESIGN AND CONTINGENCIES - $650,000) 15 (V) S.R.2028 16 (A) S.R.2028, INDUSTRIAL PARK ACCESS ROAD, 17 NEW ROADWAY 870,000 18 (BASE PROJECT ALLOCATION - $730,000) 19 (LAND ALLOCATION - $40,000) 20 (DESIGN AND CONTINGENCIES - $100,000) 21 (19) COLUMBIA COUNTY 22 (I) S.R.0080 23 (A) I-80 FROM MONTOUR COUNTY LINE TO 24 LUZERNE COUNTY LINE, PAVEMENT 25 RESTORATION, BRIDGE REHABILITATION AND 26 SAFETY IMPROVEMENTS 1,950,000 27 (BASE PROJECT ALLOCATION - $1,900,000) 28 (DESIGN AND CONTINGENCIES - $50,000) 29 (II) S.R.0054 AND S.R.0061 30 (A) CONYNGHAM TOWNSHIP, RECONSTRUCTION 19990H1023B3629 - 115 -
1 AND/OR RELOCATION OF S.R.0054 2 APPROXIMATELY 0.7 MILES NORTH OF THE 3 COLUMBIA/SCHUYLKILL COUNTY LINE 7,000,000 4 (BASE PROJECT ALLOCATION - $6,000,000) 5 (LAND ALLOCATION - $100,000) 6 (DESIGN AND CONTINGENCIES - $900,000) 7 (III) S.R.0044 8 (A) HEMLOCK TOWNSHIP, RECONSTRUCTION 9 AND/OR RELOCATION OF S.R.0044 AT THE 10 INTERSECTION WITH PEPPERMILL ROAD 11 S.R.4012 FROM THE INTERSECTION OF LOVER 12 DRIVE, TR-487 NORTH TO THE 13 HEMLOCK/MADISON TOWNSHIP LINE 4,000,000 14 (BASE PROJECT ALLOCATION - $3,000,000) 15 (LAND ALLOCATION - $500,000) 16 (DESIGN AND CONTINGENCIES - $500,000) 17 (IV) S.R.0011 18 (A) BRIAR CREEK AND BERWICK BOROUGH, 19 IMPROVEMENTS FROM BRIAR CREEK TO 20 COLUMBIA/LUZERNE COUNTY LINE 78,000,000 21 (BASE PROJECT ALLOCATION - $66,000,000) 22 (LAND ALLOCATION - $6,000,000) 23 (DESIGN AND CONTINGENCIES - $6,000,000) 24 (B) U.S.11/PA 487 INTERCHANGE TO PARK 25 STREET, CITY OF BLOOMSBURG, RECONSTRUCT 26 INTERSECTION 250,000 27 (BASE PROJECT ALLOCATION - $150,000) 28 (DESIGN AND CONTINGENCIES - $100,000) 29 (C) INTERCHANGE OF U.S.11 AND PA 42, CITY 30 OF BLOOMSBURG, SIGNING 11,000 19990H1023B3629 - 116 -
1 (DESIGN AND CONTINGENCIES - $11,000) 2 (V) PA 42 AND PA 44 3 (A) PA 42, I-80 TO SCHOOL HOUSE ROAD, PA 4 44, HEMLOCK TOWNSHIP, PATCHING, 5 GRINDING AND OVERLAY 405,000 6 (BASE PROJECT ALLOCATION - $220,000) 7 (DESIGN AND CONTINGENCIES - $185,000) 8 (VI) S.R.0487 9 (A) CATAWISSA BOROUGH AND FRANKLIN 10 TOWNSHIP, RELOCATION AND NEW 11 CONSTRUCTION OF S.R.0487 NEAR RIDER 12 ROAD, T-344 AND MCINTYRE ROAD, T-393 6,500,000 13 (BASE PROJECT ALLOCATION - $5,000,000) 14 (LAND ALLOCATION - $1,000,000) 15 (DESIGN AND CONTINGENCIES - $500,000) 16 (20) CRAWFORD COUNTY 17 (I) S.R.0027 18 (A) IMPROVEMENTS FROM LITTLE SUGAR CREEK 19 BRIDGE TO TOWNSHIP LINE AT FRENCHTOWN, 20 SAFETY IMPROVEMENT 271,000 21 (BASE PROJECT ALLOCATION - $126,000) 22 (LAND ALLOCATION - $50,000) 23 DESIGN AND CONTINGENCIES - $95,000) 24 (II) S.R.0077 25 (A) PA 77 AND PA 408 INTERSECTION, WIDEN 26 AND ADD TURN LANE AT LOWER CREST 135,000 27 (BASE PROJECT ALLOCATION - $120,000) 28 (LAND ALLOCATION - $6,000) 29 (DESIGN AND CONTINGENCIES - $9,000) 30 (III) S.R.0079 19990H1023B3629 - 117 -
1 (A) I-79 FROM MERCER COUNTY LINE TO ERIE 2 COUNTY LINE, PAVEMENT RESTORATION, 3 BRIDGE REHABILITATION AND SAFETY 4 IMPROVEMENTS 11,000,000 5 (BASE PROJECT ALLOCATION - $10,000,000) 6 (DESIGN AND CONTINGENCIES - $1,000,000) 7 (IV) PA 408 8 (A) PA 408 STRAWBRIDGE ROAD TO PA 428 AND 9 STEADMAN ROAD TO SHINER ROAD, WIDEN AND 10 STRAIGHTEN ROADWAY 325,000 11 (BASE PROJECT ALLOCATION - $265,000) 12 (LAND ALLOCATION - $40,000) 13 (DESIGN AND CONTINGENCIES - $20,000) 14 (21) CUMBERLAND COUNTY 15 (I) S.R.0011 16 (A) REALIGN LAMB'S GAP ROAD WITH SILVER 17 SPRING ROAD AT THEIR INTERSECTION WITH 18 U.S.11, SILVER SPRING TOWNSHIP 4,875,000 19 (BASE PROJECT ALLOCATION - $4,250,000) 20 (LAND ALLOCATION - $250,000) 21 (DESIGN AND CONTINGENCIES - $375,000) 22 (B) CONSTRUCT TURNING LANES AT 23 INTERSECTION OF S.R.0011 AND CAVALRY 24 ROAD, MIDDLESEX TOWNSHIP 120,000 25 (BASE PROJECT ALLOCATION - $80,000) 26 (LAND ALLOCATION - $10,000) 27 (DESIGN AND CONTINGENCIES - $30,000) 28 (C) CONSTRUCT TURNING LANES AT 29 INTERSECTION OF S.R.0011 AND HARMONY 30 HALL/WOLF'S BRIDGE ROAD, MIDDLESEX 19990H1023B3629 - 118 -
1 TOWNSHIP 120,000 2 (BASE PROJECT ALLOCATION - $80,000) 3 (LAND ALLOCATION - $10,000) 4 (DESIGN AND CONTINGENCIES - $30,000) 5 (II) S.R.0034 6 (A) HOLLY PIKE INTERSECTION WITH S.R.0174, 7 SOUTH MIDDLETON TOWNSHIP 195,000 8 (BASE PROJECT ALLOCATION - $40,000) 9 (LAND ALLOCATION - $30,000) 10 (DESIGN AND CONTINGENCIES - $125,000) 11 (III) S.R.0081 12 (A) I-81 CARLISLE WEST, PREVENTIVE 13 MAINTENANCE, STONEHOUSE ROAD TO 14 PETERSBURG ROAD 1,210,000 15 (BASE PROJECT ALLOCATION - $1,000,000) 16 (LAND ALLOCATION - $10,000) 17 (DESIGN AND CONTINGENCIES - $200,000) 18 (B) INTERSECTION IMPROVEMENTS AT I-81 19 NORTHBOUND RAMP AND S.R.0074, MIDDLESEX 20 TOWNSHIP 50,000 21 (BASE PROJECT ALLOCATION - $40,000) 22 (DESIGN AND CONTINGENCIES - $10,000) 23 (C) INTERSECTION IMPROVEMENTS AT I-81 24 SOUTHBOUND RAMP AND S.R.0074, MIDDLESEX 25 TOWNSHIP 50,000 26 (BASE PROJECT ALLOCATION - $40,000) 27 (DESIGN AND CONTINGENCIES - $10,000) 28 (D) INTERSECTION IMPROVEMENTS AT I-81 29 SOUTHBOUND RAMP AND S.R.0641, MIDDLESEX 30 TOWNSHIP 50,000 19990H1023B3629 - 119 -
1 (BASE PROJECT ALLOCATION - $40,000) 2 (DESIGN AND CONTINGENCIES - $10,000) 3 (E) I-81 FROM DAUPHIN COUNTY LINE TO 4 FRANKLIN COUNTY LINE, PAVEMENT 5 RESTORATION, BRIDGE REHABILITATION AND 6 SAFETY IMPROVEMENTS 3,950,000 7 (BASE PROJECT ALLOCATION - $3,900,000) 8 (DESIGN AND CONTINGENCIES - $50,000) 9 (F) S.R.0081, REBUILDING OF EXIT 12 RAMP 13,400,000 10 (DESIGN AND CONTINGENCIES - $1,200,000) 11 (LAND ALLOCATION - $2,200,000) 12 (DESIGN AND CONTINGENCIES - 13 $10,000,000) 14 (G) S.R.0081, REBUILDING OF EXITS 15 AND 15 16 RAMPS 3,000,000 16 (BASE PROJECT ALLOCATION - $2,000,000) 17 (LAND ALLOCATION - $800,000 18 (DESIGN AND CONTINGENCIES - $200,000) 19 (IV) S.R.0083 20 (A) I-83 FROM YORK COUNTY LINE TO DAUPHIN 21 COUNTY LINE, PAVEMENT RESTORATION, 22 BRIDGE REHABILITATION AND SAFETY 23 IMPROVEMENTS 350,000 24 (BASE PROJECT ALLOCATION - $300,000) 25 (DESIGN AND CONTINGENCIES - $50,000) 26 (V) S.R.0015 27 (A) U.S.15 FROM YORK COUNTY LINE TO PA 28 581, PAVEMENT RESTORATION, BRIDGE 29 REHABILITATION AND SAFETY IMPROVEMENTS 750,000 30 (BASE PROJECT ALLOCATION - $700,000) 19990H1023B3629 - 120 -
1 (DESIGN AND CONTINGENCIES - $50,000) 2 (VI) S.R.0581 3 (A) S.R.0581 FROM I-83 TO I-81, PAVEMENT 4 RESTORATION, BRIDGE REHABILITATION AND 5 SAFETY IMPROVEMENTS 850,000 6 (BASE PROJECT ALLOCATION - $800,000) 7 (DESIGN AND CONTINGENCIES - $50,000) 8 (B) S.R.0581, ADDITIONAL EXIT RAMPS 12,500,000 9 (BASE PROJECT ALLOCATION - $8,500,000) 10 (LAND ALLOCATION - $1,500,000) 11 (DESIGN AND CONTINGENCIES - $2,500,000) 12 (VII) S.R.1013 13 (A) WIDENING OF S.R.1013 AND REALIGNMENT 14 WITH SILVER CREEK ROAD, HAMPDEN 15 TOWNSHIP 1,500,000 16 (BASE PROJECT ALLOCATION - $1,000,000) 17 (LAND ALLOCATION - $250,000) 18 (DESIGN AND CONTINGENCIES - $250,000) 19 (VIII) S.R.0074 20 (A) INTERSECTION IMPROVEMENTS AT S.R.0074 21 AND FORGE ROAD, MIDDLESEX TOWNSHIP 50,000 22 (BASE PROJECT ALLOCATION - $40,000) 23 (DESIGN AND CONTINGENCIES - $10,000) 24 (B) CONSTRUCT TURNING LANES AND 25 INTERSECTION IMPROVEMENTS AT S.R.0074 26 AND FAIRVIEW DRIVE, MIDDLESEX TOWNSHIP 160,000 27 (BASE PROJECT ALLOCATION - $100,000) 28 (LAND ALLOCATION - $20,000) 29 (DESIGN AND CONTINGENCIES - $40,000) 30 (IX) S.R.0641 19990H1023B3629 - 121 -
1 (A) CONSTRUCT TURNING LANES AT S.R.0641 2 AND FAIRVIEW LANE, MIDDLESEX TOWNSHIP 120,000 3 (BASE PROJECT ALLOCATION - $80,000) 4 (LAND ALLOCATION - $10,000) 5 (DESIGN AND CONTINGENCIES - $30,000) 6 (X) FAIRVIEW DRIVE 7 (A) INTERSECTION IMPROVEMENTS AT FAIRVIEW 8 DRIVE AND CLAREMONT ROAD, MIDDLESEX 9 TOWNSHIP 50,000 10 (BASE PROJECT ALLOCATION - $40,000) 11 (DESIGN AND CONTINGENCIES - $10,000) 12 (XI) S.R.0696 13 (A) CONSTRUCTION OF AN INTERCONNECTION OF 14 PA 696 SOUTH WITH PA 696 NORTH TO 15 FACILITATE TRAFFIC FLOW INTO AND 16 EXITING FROM THE BOROUGH OF 17 SHIPPENSBURG, SHIPPENSBURG TOWNSHIP AND 18 SOUTHAMPTON TOWNSHIP 10,000,000 19 (XII) S.R.0944 20 (A) S.R.0944, WIDENING OF WERTZVILLE ROAD 21 THROUGHOUT CUMBERLAND COUNTY, FROM 22 ROUTE 15 TO PERRY COUNTY LINE 7,200,000 23 (BASE PROJECT ALLOCATION - $5,000,000) 24 (LAND ALLOCATION - $1,500,000) 25 (DESIGN AND CONTINGENCIES - $700,000) 26 (XIII) ST. JOHN'S ROAD 27 (A) REALIGN INTERSECTION OF ST. JOHN'S 28 CHURCH ROAD AND MAIN STREET, HAMPDEN 29 TOWNSHIP 150,000 30 (BASE PROJECT ALLOCATION - $150,000) 19990H1023B3629 - 122 -
1 (22) DAUPHIN COUNTY 2 (I) S.R.0422 3 (A) SIGNALIZATION AND REALIGNMENT OF 4 INTERSECTIONS WITH U.S.422, U.S.322, 5 S.R.0743 AND S.R.2016, DERRY TOWNSHIP 8,000,000 6 (BASE PROJECT ALLOCATION - $8,000,000) 7 (B) INTERSECTION IMPROVEMENTS AND 8 UPGRADING OF CHOCOLATE AVENUE, DERRY 9 TOWNSHIP 3,700,000 10 (BASE PROJECT ALLOCATION - $2,440,000) 11 (LAND ALLOCATION - $600,000) 12 (DESIGN AND CONTINGENCIES - $660,000) 13 (C) ACCESS IMPROVEMENTS, CHOCOLATE AVENUE; 14 DEVELOP INTERMODAL TRANSPORTATION 15 CENTER, DERRY TOWNSHIP 11,250,000 16 (BASE PROJECT ALLOCATION - $8,750,000) 17 (LAND ALLOCATION - $900,000) 18 (DESIGN AND CONTINGENCIES - $1,600,000) 19 (II) HERSHEY PARK DRIVE EXTENSION 20 (A) RELOCATION OF HERSHEY PARK DRIVE FROM 21 S.R.0743 AND LINGLE AVENUE, DERRY 22 TOWNSHIP 1,400,000 23 (BASE PROJECT ALLOCATION - $900,000) 24 (LAND ALLOCATION - $100,000) 25 (DESIGN AND CONTINGENCIES - $400,000) 26 (III) S.R.0022 27 (A) U.S.22 FROM ELMERTON AVENUE TO PERRY 28 COUNTY LINE, PAVEMENT RESTORATION, 29 BRIDGE REHABILITATION AND SAFETY 30 IMPROVEMENTS 950,000 19990H1023B3629 - 123 -
1 (BASE PROJECT ALLOCATION - $900,000) 2 (DESIGN AND CONTINGENCIES - $50,000) 3 (IV) S.R.0081 4 (A) I-81 FROM LEBANON COUNTY LINE TO 5 CUMBERLAND COUNTY LINE, PAVEMENT 6 RESTORATION, BRIDGE REHABILITATION AND 7 SAFETY IMPROVEMENTS 1,750,000 8 (BASE PROJECT ALLOCATION - $1,700,000) 9 (DESIGN AND CONTINGENCIES - $50,000) 10 (V) S.R.0083 11 (A) I-83 FROM CUMBERLAND COUNTY LINE TO I- 12 81, PAVEMENT RESTORATION, BRIDGE 13 REHABILITATION AND SAFETY IMPROVEMENTS 950,000 14 (BASE PROJECT ALLOCATION - $900,000) 15 (DESIGN AND CONTINGENCIES - $50,000) 16 (VI) S.R.0743 17 (A) RELOCATION OF PARK AVENUE, DERRY 18 TOWNSHIP 3,965,000 19 (BASE PROJECT ALLOCATION - $2,215,000) 20 (LAND ALLOCATION - $900,000) 21 (DESIGN AND CONTINGENCIES - $850,000) 22 (VII) S.R.0283 23 (A) I-283 FROM PENNSYLVANIA TURNPIKE TO I- 24 83, PAVEMENT RESTORATION, BRIDGE 25 REHABILITATION AND SAFETY IMPROVEMENTS 350,000 26 (BASE PROJECT ALLOCATION - $300,000) 27 (DESIGN AND CONTINGENCIES - $50,000) 28 (B) S.R.0283 FROM LANCASTER COUNTY LINE TO 29 I-283 JUNCTION, PAVEMENT RESTORATION, 30 BRIDGE REHABILITATION AND SAFETY 19990H1023B3629 - 124 -
1 IMPROVEMENTS 1,050,000 2 (BASE PROJECT ALLOCATION - $1,000,000) 3 (DESIGN AND CONTINGENCIES - $50,000) 4 (C) AIRPORT EXTENSION FROM AIRPORT TO PA 5 283 EAST/WEST JUNCTION, PAVEMENT 6 RESTORATION, BRIDGE REHABILITATION AND 7 SAFETY IMPROVEMENTS 250,000 8 (BASE PROJECT ALLOCATION - $200,000) 9 (DESIGN AND CONTINGENCIES - $50,000) 10 (VIII) S.R.0322 11 (A) U.S.322 FROM HERSHEY TO I-83 JUNCTION, 12 PAVEMENT RESTORATION, BRIDGE 13 REHABILITATION AND SAFETY IMPROVEMENTS 850,000 14 (BASE PROJECT ALLOCATION - $800,000) 15 (DESIGN AND CONTINGENCIES - $50,000) 16 (IX) S.R.2019 17 (A) WIDEN AND INTERSECTION IMPROVEMENTS ON 18 NYES ROAD 7,500,000 19 (BASE PROJECT ALLOCATION - $6,000,000) 20 (LAND ALLOCATION - $500,000) 21 (DESIGN AND CONTINGENCIES - $1,000,000) 22 (X) S.R.0022 23 (A) IMPROVEMENTS TO INTERSECTION OF 24 S.R.0022 AND MANOR ROAD, WEST HANOVER 25 TOWNSHIP 1,140,000 26 (BASE PROJECT ALLOCATION - $900,000) 27 (LAND ALLOCATION - $90,000) 28 (DESIGN AND CONTINGENCIES - $150,000) 29 (XI) MARKET STREET 30 (A) RESTORE AND UPGRADE MARKET STREET 19990H1023B3629 - 125 -
1 BRIDGE STRUCTURE, INCLUDING LIGHTING 2 AND AMENITIES, CITY OF HARRISBURG 688,000 3 (XII) S.R.2036 4 (A) PA 743/S.R.2012 INTERSECTION TO LINGLE 5 AVENUE, DERRY TOWNSHIP, NEW ROADWAY 8,394,000 6 (BASE PROJECT ALLOCATION - $6,394,000) 7 (LAND ALLOCATION - $1,600,000) 8 (DESIGN AND CONTINGENCIES - $400,000) 9 (XIII) S.R.0209 10 (A) BOROUGH OF MILLERSBURG, UNION STREET 11 FROM THE MILLERSBURG SQUARE TO WALNUT 12 STREET, PAVEMENT RESTORATION AND 13 DRAINAGE 30,000 14 (23) DAUPHIN AND CUMBERLAND COUNTIES 15 (I) CAPITAL BELTWAY 16 (A) I-81/I-83 INCIDENT MANAGEMENT/ITS) 3,015,000 17 (BASE PROJECT ALLOCATION - $3,000,000) 18 (DESIGN AND CONTINGENCIES - $15,000) 19 (24) DELAWARE COUNTY 20 (I) S.R.0003 21 (A) IMPROVEMENTS FROM NORTH LAWRENCE ROAD 22 TO U.S.1, HAVERFORD TOWNSHIP 800,000 23 (BASE PROJECT ALLOCATION - $776,000) 24 (LAND ALLOCATION - $16,000) 25 (DESIGN AND CONTINGENCIES - $8,000) 26 (II) S.R.2006 27 (A) IMPROVEMENTS TO MACDADE BOULEVARD FROM 28 I-476 TO FAIRVIEW ROAD, RIDLEY 29 TOWNSHIP 126,000 30 (BASE PROJECT ALLOCATION - $100,000) 19990H1023B3629 - 126 -
1 (LAND ALLOCATION - $2,000) 2 (DESIGN AND CONTINGENCIES - $24,000) 3 (III) S.R.0001 4 (A) U.S.1 FROM PA 320 TO PA 352, PAVEMENT 5 RESTORATION, BRIDGE REHABILITATION AND 6 SAFETY IMPROVEMENTS 450,000 7 (BASE PROJECT ALLOCATION - $400,000) 8 (DESIGN AND CONTINGENCIES - $50,000) 9 (B) U.S.1/U.S.322, INTERCHANGE AND ACCESS 10 IMPROVEMENTS 5,000,000 11 (BASE PROJECT ALLOCATION - $3,750,000) 12 (LAND ALLOCATION - $625,000) 13 (DESIGN AND CONTINGENCIES - $625,000) 14 (C) U.S.1/PENNSYLVANIA TURNPIKE/STREET 15 ROAD, INTERCHANGE AND ACCESS 16 IMPROVEMENTS 10,000,000 17 (BASE PROJECT ALLOCATION - $8,000,000) 18 (LAND ALLOCATION - $1,000,000) 19 (DESIGN AND CONTINGENCIES - $1,000,000) 20 (IV) S.R.0095 21 (A) I-95 FROM PHILADELPHIA COUNTY LINE TO 22 DELAWARE STATE LINE, PAVEMENT 23 RESTORATION, BRIDGE REHABILITATION AND 24 SAFETY IMPROVEMENTS 1,150,000 25 (BASE PROJECT ALLOCATION - $1,100,000) 26 (DESIGN AND CONTINGENCIES - $50,000) 27 (V) S.R.0322 28 (A) U.S.322 FROM C. BARRY BRIDGE TO 29 S.R.3016, PAVEMENT RESTORATION, BRIDGE 30 REHABILITATION AND SAFETY IMPROVEMENTS 350,000 19990H1023B3629 - 127 -
1 (BASE PROJECT ALLOCATION - $300,000) 2 (DESIGN AND CONTINGENCIES - $50,000) 3 (VI) S.R.0476 4 (A) I-476 FROM I-95 TO MONTGOMERY COUNTY 5 LINE, PAVEMENT RESTORATION, BRIDGE 6 REHABILITATION AND SAFETY IMPROVEMENTS 1,450,000 7 (BASE PROJECT ALLOCATION - $1,400,000) 8 (DESIGN AND CONTINGENCIES - $50,000) 9 (25) ERIE COUNTY 10 (I) S.R.0079 11 (A) I-79 FROM CRAWFORD COUNTY LINE TO BAY 12 FRONT, PAVEMENT RESTORATION, BRIDGE 13 REHABILITATION AND SAFETY IMPROVEMENTS 2,050,000 14 (BASE PROJECT ALLOCATION - $2,000,000) 15 (DESIGN AND CONTINGENCIES - $50,000) 16 (II) S.R.0090 17 (A) I-90 FROM NEW YORK STATE LINE TO OHIO 18 STATE LINE, PAVEMENT RESTORATION, 19 BRIDGE REHABILITATION AND SAFETY 20 IMPROVEMENTS 18,000,000 21 (BASE PROJECT ALLOCATION - $16,000,000) 22 (DESIGN AND CONTINGENCIES - $2,000,000) 23 (B) I-79, FROM BAYFRONT TO MERCER COUNTY 24 LINE, PAVEMENT AND SAFETY IMPROVEMENTS 8,800,000 25 (BASE PROJECT ALLOCATION - $8,000,000) 26 (DESIGN AND CONTINGENCIES - $800,000) 27 (III) U.S.19 28 (A) U.S.19 FROM ROBINSON ROAD (S.R.4024) 29 TO OLIVER ROAD (S.R.4008), WIDEN 30 ROADWAY 700,000 19990H1023B3629 - 128 -
1 (BASE PROJECT ALLOCATION - $500,000) 2 (LAND ALLOCATION - $100,000) 3 (DESIGN AND CONTINGENCIES - $100,000) 4 (B) INTERSECTION OF U.S.19 AND I-90, 5 INTERSECTION IMPROVEMENT 4,935,000 6 (BASE PROJECT ALLOCATION - $4,000,000) 7 (LAND ALLOCATION - $400,000) 8 (DESIGN AND CONTINGENCIES - $535,000) 9 (C) U.S.19 FROM I-90 TO ROBINSON ROAD, 10 RECONSTRUCTION 620,000 11 (BASE PROJECT ALLOCATION - $400,000) 12 (LAND ALLOCATION - $120,000) 13 (DESIGN AND CONTINGENCIES - $100,000) 14 (IV) U.S.20 15 (A) U.S.20 FROM WATER STREET TO NAGLE 16 ROAD, WESLEYVILLE BOROUGH AND 17 HABORCREEK TOWNSHIP, RESURFACE 123,000 18 (BASE PROJECT ALLOCATION - $108,000) 19 (DESIGN AND CONTINGENCIES - $15,000) 20 (B) INTERSECTION OF U.S.20 AND PA 98, ADD 21 LEFT TURN LANE 200,000 22 (BASE PROJECT ALLOCATION - $160,000) 23 (LAND ALLOCATION - $20,000) 24 (DESIGN AND CONTINGENCIES - $20,000) 25 (C) INTERSECTION OF U.S.20 AND PA 98, 26 FAIRVIEW TOWNSHIP, SAFETY IMPROVEMENT 320,000 27 (BASE PROJECT ALLOCATION - $200,000) 28 (LAND ALLOCATION - $80,000) 29 (DESIGN AND CONTINGENCIES - $40,000) 30 (V) PA 531 19990H1023B3629 - 129 -
1 (A) PA 531 FROM I-90 TO U.S.20, 2 HARBORCREEK TOWNSHIP, WIDEN ROADWAY 1,000,000 3 (BASE PROJECT ALLOCATION - $900,000) 4 (LAND ALLOCATION - $75,000) 5 (DESIGN AND CONTINGENCIES - $25,000) 6 (VI) S.R.4024 7 (A) S.R.4024 FROM TR-99 TO ROBISON ROAD, 8 RELOCATION 960,000 9 (BASE PROJECT ALLOCATION - $480,000) 10 (LAND ALLOCATION - $400,000) 11 (DESIGN AND CONTINGENCIES - $80,000) 12 (VII) S.R.4026 13 (A) S.R.4026 FROM U.S.19 (PEACH STREET) TO 14 PA 505 (PERRY HIGHWAY), MILLCREEK AND 15 SUMMIT TOWNSHIPS, RECONSTRUCTION 200,000 16 (BASE PROJECT ALLOCATION - $180,000) 17 (LAND ALLOCATION - $10,000) 18 (DESIGN AND CONTINGENCIES - $10,000) 19 (VIII) ORE DOCK ACCESS ROAD 20 (A) FROM THE BAYFRONT HIGHWAY 0.44 MILES 21 NORTH, RELOCATION 1,280,000 22 (BASE PROJECT ALLOCATION - $1,120,000) 23 (LAND ALLOCATION - $40,000) 24 (DESIGN AND CONTINGENCIES - $120,000) 25 (26) FAYETTE COUNTY 26 (I) S.R.0040 27 (A) WIDEN S.R.0040 AND REDESIGN AND 28 CONSTRUCT INTERCHANGE OF S.R.0040 AND 29 S.R.0119, SOUTH UNION TOWNSHIP, NORTH 30 UNION TOWNSHIP AND CITY OF UNIONTOWN 9,750,000 19990H1023B3629 - 130 -
1 (BASE PROJECT ALLOCATION - $8,000,000) 2 (LAND ALLOCATION - $500,000) 3 (DESIGN AND CONTINGENCIES - $1,250,000) 4 (B) WIDEN S.R.0040 FROM S.R.0119 TO DUCK 5 HOLLOW ROAD, SOUTH UNION TOWNSHIP AND 6 NORTH UNION TOWNSHIP 4,350,000 7 (BASE PROJECT ALLOCATION - $3,500,000) 8 (LAND ALLOCATION - $250,000) 9 (DESIGN AND CONTINGENCIES - $600,000) 10 (C) EXTEND MATTHEW DRIVE FROM S.R.0040 TO 11 DUCK HOLLOW ROAD, SOUTH UNION TOWNSHIP 3,350,000 12 (BASE PROJECT ALLOCATION - $1,250,000) 13 (LAND ALLOCATION - $1,900,000) 14 (DESIGN AND CONTINGENCIES - $200,000) 15 (D) U.S.40, FROM PA 166 TO MORGAN STREET, 16 SAFETY IMPROVEMENT/CENTER TURN LANE 126,000 17 (BASE PROJECT ALLOCATION - $100,000) 18 (LAND ALLOCATION - $10,000) 19 (DESIGN AND CONTINGENCIES - $16,000) 20 (II) S.R.4006 21 (A) WIDEN S.R.4006 FROM S.R.0040 TO 22 MATTHEW DRIVE, SOUTH UNION TOWNSHIP 1,450,000 23 (BASE PROJECT ALLOCATION - $1,000,000) 24 (LAND ALLOCATION - $250,000) 25 (DESIGN AND CONTINGENCIES - $200,000) 26 (III) S.R.4003 AND S.R.4020 27 (A) IMPROVEMENTS, UPGRADES AND EXTENSIONS, 28 LUZERNE TOWNSHIP 6,500,000 29 (IV) S.R.4020 30 (A) S.R.4020 FROM PRISON ENTRANCE TO PA 19990H1023B3629 - 131 -
1 166, LUZERNE TOWNSHIP, RESTORATION 1,000,000 2 (BASE PROJECT ALLOCATION - $840,000) 3 (LAND ALLOCATION - $100,000) 4 (DESIGN AND CONTINGENCIES - $60,000) 5 (B) PRISON ENTRANCE TO PA 166, LUZERNE 6 TOWNSHIP, RESTORATION 1,000,000 7 (BASE PROJECT ALLOCATION - $840,000) 8 (LAND ALLOCATION - $100,000) 9 (DESIGN AND CONTINGENCIES - $60,000) 10 (V) U.S.119 11 (A) MORGANTOWN INTERCHANGE, SOUTH UNION 12 TOWNSHIP, RECONSTRUCTION 630,000 13 (BASE PROJECT ALLOCATION - $500,000) 14 (LAND ALLOCATION - $60,000) 15 (DESIGN AND CONTINGENCIES - $70,000) 16 (VI) S.R.2027 17 (A) INTERSECTION OF S.R.2027 AND S.R.1020, 18 SAFETY IMPROVEMENT 19,000 19 (BASE PROJECT ALLOCATION - $16,000) 20 (LAND ALLOCATION - $1,000) 21 (DESIGN AND CONTINGENCIES - $2,000) 22 (VII) S.R.3019 23 (A) INTERSECTION OF S.R.3019 AND WALNUT 24 HILL ROAD, SAFETY IMPROVEMENT/ADD TURN 25 LANES 160,000 26 (BASE PROJECT ALLOCATION - $120,000) 27 (LAND ALLOCATION - $20,000) 28 (DESIGN AND CONTINGENCIES - $20,000) 29 (VIII) S.R.6040 30 (A) UNIONTOWN CENTRAL BUSINESS DISTRICT, 19990H1023B3629 - 132 -
1 CITY OF UNIONTOWN, SAFETY 2 IMPROVEMENT/SIGNAL IMPROVEMENT 110,000 3 (BASE PROJECT ALLOCATION - $80,000) 4 (LAND ALLOCATION - $10,000) 5 (DESIGN AND CONTINGENCIES - $20,000) 6 (IX) SIGNAL IMPROVEMENTS 7 (A) COUNTYWIDE SIGNAL IMPROVEMENTS 91,000 8 (BASE PROJECT ALLOCATION - $80,000) 9 (LAND ALLOCATION - $1,000) 10 (DESIGN AND CONTINGENCIES - $10,000) 11 (27) FOREST COUNTY 12 (I) S.R.0666 13 (A) WIDEN AND REHABILITATE S.R.0666, FROM 14 VILLAGE OF LYNCH TO THE VILLAGE OF WHIG 15 HILL, HOWE AND KINGSLEY TOWNSHIPS 16,500,000 16 (BASE PROJECT ALLOCATION - $14,000,000) 17 (LAND ALLOCATION - $1,000,000) 18 (DESIGN AND CONTINGENCIES - $1,500,000) 19 (II) S.R.0948 20 (A) WIDEN AND RESURFACE S.R.0948 FROM 21 WARREN COUNTY LINE TO BROOKSTON 1,390,000 22 (BASE PROJECT ALLOCATION - $1,300,000) 23 (DESIGN AND CONTINGENCIES - $90,000) 24 (III) S.R.0899 25 (A) WIDEN AND RESURFACE S.R.0899 FROM 26 S.R.0066 TO CLARION COUNTY LINE 6,000,000 27 (BASE PROJECT ALLOCATION - $5,250,000) 28 (DESIGN AND CONTINGENCIES - $750,000) 29 (28) FRANKLIN COUNTY 30 (I) S.R.0081 19990H1023B3629 - 133 -
1 (A) I-81 RECONDITION LEVEL 4 FROM NORTH OF 2 SCOTLAND TO CUMBERLAND COUNTY LINE 2,154,000 3 (BASE PROJECT ALLOCATION - $2,032,000) 4 (LAND ALLOCATION - $1,000) 5 (DESIGN AND CONTINGENCIES - $121,000) 6 (B) I-81 FROM CUMBERLAND COUNTY LINE TO 7 MARYLAND STATE LINE, PAVEMENT 8 RESTORATION, BRIDGE REHABILITATION AND 9 SAFETY IMPROVEMENTS 2,650,000 10 (BASE PROJECT ALLOCATION - $2,600,000) 11 (DESIGN AND CONTINGENCIES - $50,000) 12 (C) I-81 AT EXIT 2, INTERCHANGE 13 IMPROVEMENTS, ANTRIM TOWNSHIP 1,865,000 14 (BASE PROJECT ALLOCATION - $1,700,000) 15 (LAND ALLOCATION - $15,000) 16 (DESIGN AND CONTINGENCIES - $150,000) 17 (29) FULTON COUNTY 18 (I) S.R.0030 19 (A) U.S.30 FROM NEAR S.R.1006 TO 20 S.R.1004/OLIVER DRIVE, PAVEMENT 21 RESTORATION, BRIDGE REHABILITATION AND 22 SAFETY IMPROVEMENTS 450,000 23 (BASE PROJECT ALLOCATION - $400,000) 24 (DESIGN AND CONTINGENCIES - $50,000) 25 (II) S.R.0070 26 (A) I-70 FROM MARYLAND STATE LINE TO 27 BEDFORD COUNTY LINE, PAVEMENT 28 RESTORATION, BRIDGE REHABILITATION AND 29 SAFETY IMPROVEMENTS 2,050,000 30 (BASE PROJECT ALLOCATION - $2,000,000) 19990H1023B3629 - 134 -
1 (DESIGN AND CONTINGENCIES - $50,000) 2 (30) GREENE COUNTY 3 (I) S.R.0021 4 (A) IMPROVEMENTS TO ROUTE 21 AT KIWI ROAD, 5 RECONSTRUCTION AND EXTENSION OF KIWI 6 ROAD, AND SIGNALIZATION UPGRADE OF I-79 7 RAMP INTERSECTIONS 1,729,000 8 (BASE PROJECT ALLOCATION - $1,504,000) 9 (DESIGN AND CONTINGENCIES - $225,000) 10 (B) DEVELOPMENT OF A CONNECTOR ROAD FROM 11 S.R.0021 TO NEMACOLIN, CUMBERLAND 12 TOWNSHIP AND MONONGAHELA TOWNSHIP 500,000 13 (BASE PROJECT ALLOCATION - $400,000) 14 (DESIGN AND CONTINGENCIES - $100,000) 15 (II) TR-624 16 (A) AREFORD BOULEVARD, EXTEND 2-LANE 17 BLACKTOP WITH CUL-DE-SAC 1/4 MILE, 18 CARMICHAELS BOROUGH 300,000 19 (III) S.R.0209 (R.D.1) 20 (A) EXTEND ACCESS ROAD TO INDUSTRIAL PARK 21 1/2 MILE, MOUNT MORRIS, PERRY TOWNSHIP 650,000 22 (IV) S.R.0079 23 (A) I-79 FROM WEST VIRGINIA STATE LINE TO 24 WASHINGTON COUNTY LINE, PAVEMENT 25 RESTORATION, BRIDGE REHABILITATION AND 26 SAFETY IMPROVEMENTS 2,250,000 27 (BASE PROJECT ALLOCATION - $2,200,000) 28 (DESIGN AND CONTINGENCIES - $50,000) 29 (V) U.S.19 30 (A) U.S.19/PA 221 INTERSECTION, SAFETY 19990H1023B3629 - 135 -
1 IMPROVEMENT 50,000 2 (BASE PROJECT ALLOCATION - $20,000) 3 (LAND ALLOCATION - $20,000) 4 (DESIGN AND CONTINGENCIES - $10,000) 5 (B) U.S.19/PA 221 INTERSECTION, CONSTRUCT 6 PARK AND RIDE LOT 120,000 7 (BASE PROJECT ALLOCATION - $100,000) 8 (LAND ALLOCATION - $10,000) 9 (DESIGN AND CONTINGENCIES - $10,000) 10 (VI) PA 88 11 (A) INTERSECTIONS AT S.R.1006 AND 12 S.R.1021, CARMICHAELS BOROUGH, SAFETY 13 IMPROVEMENTS 38,000 14 (BASE PROJECT ALLOCATION - $34,000) 15 (DESIGN AND CONTINGENCIES - $4,000) 16 (31) HUNTINGDON COUNTY 17 (I) S.R.3047 18 (A) TURN LANE AND SIGNALIZATION OF SOUTH 19 4TH STREET, HUNTINGDON BOROUGH 90,000 20 (BASE PROJECT ALLOCATION - $70,000) 21 (LAND ALLOCATION - $5,000) 22 (DESIGN AND CONTINGENCIES - $15,000) 23 (II) U.S.22 24 (A) INTERSECTION OF U.S.22 AND PA 655 25 (VALLEY STREET), MILL CREEK BOROUGH, 26 SAFETY IMPROVEMENT 9,000 27 (BASE PROJECT ALLOCATION - $7,000) 28 (LAND ALLOCATION - $1,000) 29 (DESIGN AND CONTINGENCIES - $1,000) 30 (32) INDIANA COUNTY 19990H1023B3629 - 136 -
1 (I) S.R.0119 2 (A) U.S.119 FROM TWO LICK TO S.R.1010, 3 PAVEMENT RESTORATION, BRIDGE 4 REHABILITATION AND SAFETY IMPROVEMENTS 850,000 5 (BASE PROJECT ALLOCATION - $800,000) 6 (DESIGN AND CONTINGENCIES - $50,000) 7 (B) U.S.119, FROM PA 56 TO SNYDER LANE, 8 BURRELL AND CENTER TOWNSHIPS, ADD 9 LANES 9,600,000 10 (BASE PROJECT ALLOCATION - $8,000,000) 11 (LAND ALLOCATION - $800,000) 12 (DESIGN AND CONTINGENCIES - $800,000) 13 (II) S.R.0422 14 (A) U.S.422 FROM PIKES PEAK TO U.S.119, 15 PAVEMENT RESTORATION, BRIDGE 16 REHABILITATION AND SAFETY IMPROVEMENTS 950,000 17 (BASE PROJECT ALLOCATION - $900,000) 18 (DESIGN AND CONTINGENCIES - $50,000) 19 (III) ROSE STREET EXTENSION 20 (A) PA 286 NORTH TO S.R.4032, WHITE 21 TOWNSHIP, RELOCATION 671,000 22 (BASE PROJECT ALLOCATION - $228,000) 23 (LAND ALLOCATION - $293,000) 24 (DESIGN AND CONTINGENCIES - $150,000) 25 (IV) U.S.22 26 (A) U.S.22 NORTH TO SNYDER LANE, BURRELL 27 TOWNSHIP, INTERCHANGE IMPROVEMENT AND 28 ADD LANES 5,745,000 29 (BASE PROJECT ALLOCATION - $4,400,000) 30 (DESIGN AND CONTINGENCIES - $1,345,000) 19990H1023B3629 - 137 -
1 (B) U.S.22, FROM PA 289 EAST TO FOUR-LANE 2 SECTION, EAST AND WEST WHEATFIELD 3 TOWNSHIPS, ADD LANES 5,200,000 4 (BASE PROJECT ALLOCATION - $4,000,000) 5 (LAND ALLOCATION - $800,000) 6 (DESIGN AND CONTINGENCIES - $400,000) 7 (V) WETLAND BANK 8 (A) WETLAND BANK, COUNTYWIDE 9 RECONSTRUCTION OF WETLAND BANK 71,000 10 (BASE PROJECT ALLOCATION - $40,000) 11 (LAND ALLOCATION - $10,000) 12 (DESIGN AND CONTINGENCIES - $21,000) 13 (VI) S.R.3043 14 (A) FROM INTERSECTION OF S.R.3043 AND PA 15 286 TO S.R.4032, WHITE TOWNSHIP, 16 RELOCATION/NEW ROADWAY 940,000 17 (BASE PROJECT ALLOCATION - $550,000) 18 (LAND ALLOCATION - $210,000) 19 (DESIGN AND CONTINGENCIES - $180,000) 20 (VII) PA 286 21 (A) FROM T-813 WEST TO U.S.422, WHITE 22 TOWNSHIP, SAFETY IMPROVEMENT 1,190,000 23 (BASE PROJECT ALLOCATION - $900,000) 24 (LAND ALLOCATION - $150,000) 25 (DESIGN AND CONTINGENCIES - $140,000) 26 (VIII) S.R.3013 27 (A) INTERSECTION OF S.R.3013 AND S.R.3008, 28 BLACKLICK TOWNSHIP, SAFETY IMPROVEMENT 146,000 29 (BASE PROJECT ALLOCATION - $100,000) 30 (LAND ALLOCATION - $15,000) 19990H1023B3629 - 138 -
1 (DESIGN AND CONTINGENCIES - $31,000) 2 (IX) PA 403 3 (A) PA 403 JUST EAST OF THE INTERSECTION 4 WITH PA 286, CLYMER BOROUGH, SAFETY 5 IMPROVEMENT/RESTORATION 146,000 6 (BASE PROJECT ALLOCATION - $80,000) 7 (LAND ALLOCATION - $35,000) 8 (DESIGN AND CONTINGENCIES - $31,000) 9 (33) JEFFERSON COUNTY 10 (I) S.R.0080 11 (A) I-80 FROM CLEARFIELD COUNTY LINE TO 12 CLARION COUNTY LINE, PAVEMENT 13 RESTORATION, BRIDGE REHABILITATION AND 14 SAFETY IMPROVEMENTS 2,450,000 15 (BASE PROJECT ALLOCATION - $2,400,000) 16 (DESIGN AND CONTINGENCIES - $50,000) 17 (B) I-80, CLARION COUNTY TO CLEARFIELD 18 COUNTY, COUNTYWIDE ITS, SAFETY 19 IMPROVEMENT 270,000 20 (BASE PROJECT ALLOCATION - $260,000) 21 (DESIGN AND CONTINGENCIES - $10,000) 22 (II) WETLAND BANKING 23 (A) COUNTYWIDE, RECONSTRUCTION OF WETLAND 24 BANKING 70,000 25 (BASE PROJECT ALLOCATION - $40,000) 26 (LAND ALLOCATION - $10,000) 27 (DESIGN AND CONTINGENCIES - $20,000) 28 (III) PA 36 29 (A) INTERSECTION OF PA 36 AND PA 949, 30 VILLAGE OF SIGEL, ELDRED TOWNSHIP, 19990H1023B3629 - 139 -
1 SAFETY IMPROVEMENTS 206,000 2 (BASE PROJECT ALLOCATION - $130,000) 3 (LAND ALLOCATION - $40,000) 4 (DESIGN AND CONTINGENCIES - $36,000) 5 (IV) U.S.119 6 (A) INTERSECTION OF U.S.119 AND PA 410, 7 HENDERSON TOWNSHIP, RESTORATION 330,000 8 (BASE PROJECT ALLOCATION - $200,000) 9 (LAND ALLOCATION - $60,000) 10 (DESIGN AND CONTINGENCIES - $70,000) 11 (V) PA 28 12 (A) INTERSECTION OF PA 28 AND S.R.1011, 13 SNYDER TOWNSHIP, SAFETY IMPROVEMENT 310,000 14 (BASE PROJECT ALLOCATION - $180,000) 15 (LAND ALLOCATION - $60,000) 16 (DESIGN AND CONTINGENCIES - $70,000) 17 (B) FROM T-434 (MILLIRON ROAD) TO PINE 18 CREEK/WARSAW TOWNSHIP LINE, PINE CREEK 19 TOWNSHIP, SAFETY IMPROVEMENT 275,000 20 (BASE PROJECT ALLOCATION - $180,000) 21 (LAND ALLOCATION - $20,000) 22 (DESIGN AND CONTINGENCIES - $75,000) 23 (VI) PA 536 24 (A) INTERSECTION OF PA 536 AND S.R.3001, 25 RINGGOLD TOWNSHIP, SAFETY IMPROVEMENT 250,000 26 (BASE PROJECT ALLOCATION - $160,000) 27 (LAND ALLOCATION - $40,000) 28 (DESIGN AND CONTINGENCIES - $50,000) 29 (VII) U.S.119 30 (A) U.S.119 AND T-841 INTERSECTION 19990H1023B3629 - 140 -
1 (PUNXSUTAWNEY AIRPORT), BELL TOWNSHIP, 2 SAFETY IMPROVEMENT AND ADD LEFT TURN 3 LANE 255,000 4 (BASE PROJECT ALLOCATION - $150,000) 5 (LAND ALLOCATION - $30,000) 6 (DESIGN AND CONTINGENCIES - $75,000) 7 (VIII) PA 830 8 (A) FROM PA 830/S.R.1006 INTERSECTION TO 9 S.R.1006/T-548 INTERSECTION, WASHINGTON 10 TOWNSHIP, RECONSTRUCTION AND 11 RELOCATION 940,000 12 (BASE PROJECT ALLOCATION - $800,000 13 (LAND ALLOCATION - $80,000) 14 (DESIGN AND CONTINGENCIES - $60,000) 15 (34) JUNIATA COUNTY 16 (I) S.R.0022 17 (A) U.S.22 FROM PERRY COUNTY LINE TO 18 MACEDONIA, PAVEMENT RESTORATION, BRIDGE 19 REHABILITATION AND SAFETY IMPROVEMENTS 1,850,000 20 (BASE PROJECT ALLOCATION - $1,800,000) 21 (DESIGN AND CONTINGENCIES - $50,000) 22 (35) LACKAWANNA COUNTY 23 (I) S.R.0247 24 (A) MOOSIC MOUNTAIN BUSINESS PARK 1,655,000 25 (BASE PROJECT ALLOCATION - $1,525,000) 26 (LAND ALLOCATION - $10,000) 27 (DESIGN AND CONTINGENCIES - $120,000) 28 (II) S.R.0011 29 (A) U.S.11 FROM WYOMING AVENUE TO I-81, 30 PAVEMENT RESTORATION, BRIDGE 19990H1023B3629 - 141 -
1 REHABILITATION AND SAFETY IMPROVEMENTS 650,000 2 (BASE PROJECT ALLOCATION - $600,000) 3 (DESIGN AND CONTINGENCIES - $50,000) 4 (III) S.R.0006 5 (A) U.S.6, LACKAWANNA VALLEY INDUSTRIAL 6 HIGHWAY FROM I-81/I-84/I-380 JUNCTION 7 TO CARBONDALE, PAVEMENT RESTORATION, 8 BRIDGE REHABILITATION AND SAFETY 9 IMPROVEMENTS 1,550,000 10 (BASE PROJECT ALLOCATION - $1,500,000) 11 (DESIGN AND CONTINGENCIES - $50,000) 12 (B) OFFICE MAX TO TIMBER FALLS, DICKSON 13 CITY AND BLAKELY BOROUGH, RESTORATION 14 AND WIDENING 542,000 15 (BASE PROJECT ALLOCATION - $482,000) 16 (LAND ALLOCATION - $40,000) 17 (DESIGN AND CONTINGENCIES - $20,000) 18 (IV) S.R.0081 19 (A) I-81 FROM LUZERNE COUNTY LINE TO 20 SUSQUEHANNA COUNTY LINE, PAVEMENT 21 RESTORATION, BRIDGE REHABILITATION AND 22 SAFETY IMPROVEMENTS 2,750,000 23 (BASE PROJECT ALLOCATION - $2,700,000) 24 (DESIGN AND CONTINGENCIES - $50,000) 25 (V) S.R.0084 26 (A) I-84 FROM WAYNE COUNTY LINE TO I-81, 27 PAVEMENT RESTORATION, BRIDGE 28 REHABILITATION AND SAFETY IMPROVEMENTS 1,350,000 29 (BASE PROJECT ALLOCATION - $1,300,000) 30 (DESIGN AND CONTINGENCIES - $50,000) 19990H1023B3629 - 142 -
1 (VI) S.R.0307 2 (A) S.R.0307 FROM I-81 TO U.S.11, PAVEMENT 3 RESTORATION, BRIDGE REHABILITATION AND 4 SAFETY IMPROVEMENTS 150,000 5 (BASE PROJECT ALLOCATION - $100,000) 6 (DESIGN AND CONTINGENCIES - $50,000) 7 (VII) S.R.0380 8 (A) I-380 FROM MONROE COUNTY LINE TO I-81, 9 PAVEMENT RESTORATION, BRIDGE 10 REHABILITATION AND SAFETY IMPROVEMENTS 1,150,000 11 (BASE PROJECT ALLOCATION - $1,100,000) 12 (DESIGN AND CONTINGENCIES - $50,000) 13 (VIII) S.R.3011 14 (A) KEYSER AVENUE FROM TAYLOR-OLD FORGE 15 LINE TO TAYLOR-SCRANTON LINE, STORM 16 WATER MANAGEMENT SYSTEM AND ROAD 17 RECONSTRUCTION, BOROUGH OF TAYLOR 2,400,000 18 (BASE PROJECT ALLOCATION - $2,000,000) 19 (DESIGN AND CONTINGENCIES - $400,000) 20 (B) KEYSER AVENUE FROM SCRANTON-TAYLOR 21 LINE TO WEST MARKET STREET, STORM WATER 22 MANAGEMENT SYSTEM AND ROAD 23 RECONSTRUCTION, CITY OF SCRANTON 3,000,000 24 (BASE PROJECT ALLOCATION - $2,500,000) 25 (DESIGN AND CONTINGENCIES - $500,000) 26 (C) KEYSER AVENUE, STORM WATER MANAGEMENT 27 PROJECT FROM LOOP STREET TO PHILO 28 STREET INCLUDING, BUT NOT LIMITED TO, 29 CONSTRUCTION OF STORM SEWERS AND PIPING 30 ALONG KEYSER AVENUE, LOOP STREET AND 19990H1023B3629 - 143 -
1 NORTH-SOUTH ROAD AND CONSTRUCTION OF 2 WATER RETENTION POND OF UNNAMED 3 TRIBUTARY OF KEYSER CREEK TRAVELING 4 UNDERNEATH KEYSER AVENUE, S.R.3011, 5 CITY OF SCRANTON 1,600,000 6 (DESIGN AND CONTINGENCIES - $300,000) 7 (BASE PROJECT ALLOCATION - $1,300,000) 8 (IX) S.R.3003 9 (A) JACKSON STREET FROM KEYSER AVENUE TO 10 NEWTON ROAD, CONSTRUCTION OF STORM 11 WATER MANAGEMENT SYSTEM, CITY OF 12 SCRANTON 840,000 13 (BASE PROJECT ALLOCATION - $700,000) 14 (DESIGN AND CONTINGENCIES - $140,000) 15 (B) NEWTON ROAD FROM JACKSON STREET TO 16 SCRANTON-NEWTON TOWNSHIP LINE, 17 CONSTRUCTION OF STORM WATER MANAGEMENT 18 SYSTEM, CITY OF SCRANTON 2,400,000 19 (BASE PROJECT ALLOCATION - $2,000,000) 20 (DESIGN AND CONTINGENCIES - $400,000) 21 (X) S.R.3010 22 (A) UNION STREET FROM MAIN STREET TO 23 KEYSER AVENUE, ROAD RECONSTRUCTION AND 24 CONSTRUCTION OF STORM WATER MANAGEMENT 25 SYSTEM INCLUDING, BUT NOT LIMITED TO, 26 STORM SEWERS, STORM WATER PIPING, 27 CURBING, SIDEWALKS, PUMPING STATIONS 28 AND ACQUISITION OF PROPERTY, BOROUGH OF 29 TAYLOR 2,400,000 30 (BASE PROJECT ALLOCATION - $2,000,000) 19990H1023B3629 - 144 -
1 (DESIGN AND CONTINGENCIES - $400,000) 2 (XI) S.R.3012 3 (A) OAK STREET FROM MAIN STREET TO KEYSER 4 AVENUE, CONSTRUCTION OF STORM WATER 5 MANAGEMENT SYSTEM, BOROUGH OF TAYLOR 1,200,000 6 (BASE PROJECT ALLOCATION - $1,000,000) 7 (DESIGN AND CONTINGENCIES - $200,000) 8 (XII) S.R.3013 9 (A) MAIN STREET FROM TAYLOR-OLD FORGE LINE 10 TO TAYLOR-SCRANTON LINE, ROAD 11 RECONSTRUCTION AND STORM WATER 12 MANAGEMENT SYSTEM, BOROUGH OF TAYLOR 1,200,000 13 (BASE PROJECT ALLOCATION - $1,000,000) 14 (DESIGN AND CONTINGENCIES - $200,000) 15 (B) MAIN AVENUE FROM SCRANTON-TAYLOR LINE 16 TO WEST MARKET STREET, ROAD 17 RECONSTRUCTION AND STORM WATER 18 MANAGEMENT SYSTEM, CITY OF SCRANTON 1,800,000 19 (BASE PROJECT ALLOCATION - $1,500,000) 20 (DESIGN AND CONTINGENCIES - $300,000) 21 (XIII) S.R.3014 22 (A) LUZERNE STREET FROM MAIN AVENUE TO 23 KEYSER AVENUE, ROAD RECONSTRUCTION AND 24 STORM WATER MANAGEMENT SYSTEM INCLUDING 25 CURBING, CITY OF SCRANTON 1,200,000 26 (BASE PROJECT ALLOCATION - $1,000,000) 27 (DESIGN AND CONTINGENCIES - $200,000) 28 (XIV) S.R.3029 29 (A) PROVIDENCE ROAD FROM OLIVE STREET TO 30 NORTH MAIN AVENUE, CONSTRUCTION OF 19990H1023B3629 - 145 -
1 STORM WATER MANAGEMENT SYSTEM, CITY OF 2 SCRANTON 1,900,000 3 (BASE PROJECT ALLOCATION - $1,600,000) 4 (DESIGN AND CONTINGENCIES - $300,000) 5 (XV) S.R.3033 6 (A) OAK STREET FROM KEYSER AVENUE TO NORTH 7 SCRANTON EXPRESSWAY, ROAD 8 RECONSTRUCTION AND STORM WATER 9 MANAGEMENT SYSTEM, CITY OF SCRANTON 1,200,000 10 (BASE PROJECT ALLOCATION - $1,000,000) 11 (DESIGN AND CONTINGENCIES - $200,000) 12 (XVI) S.R.0347 13 (A) CYPRESS STREET FROM THROOP-OLYPHANT 14 LINE TO THROOP-DUNMORE LINE, ROAD 15 RECONSTRUCTION AND CONSTRUCTION OF 16 STORM WATER MANAGEMENT SYSTEM, BOROUGH 17 OF THROOP 1,200,000 18 (BASE PROJECT ALLOCATION - $1,000,000) 19 (DESIGN AND CONTINGENCIES - $200,000) 20 (B) DUNMORE STREET FROM THROOP-OLYPHANT 21 LINE TO THROOP-DUNMORE LINE, ROAD 22 RECONSTRUCTION AND CONSTRUCTION OF 23 STORM WATER MANAGEMENT SYSTEM, BOROUGH 24 OF THROOP 1,200,000 25 (BASE PROJECT ALLOCATION - $1,000,000) 26 (DESIGN AND CONTINGENCIES - $200,000) 27 (C) BLAKELY STREET FROM DRINKER STREET TO 28 DUNMORE-THROOP LINE, ROAD 29 RECONSTRUCTION AND CONSTRUCTION OF 30 STORM WATER MANAGEMENT SYSTEM, BOROUGH 19990H1023B3629 - 146 -
1 OF DUNMORE 1,400,000 2 (BASE PROJECT ALLOCATION - $1,150,000) 3 (DESIGN AND CONTINGENCIES - $250,000) 4 (XVII) S.R.6011 5 (A) BLAKELY STREET FROM GREEN RIDGE STREET 6 TO DUNMORE-SCRANTON LINE, ROAD 7 RECONSTRUCTION AND CONSTRUCTION OF 8 STORM WATER MANAGEMENT SYSTEM, BOROUGH 9 OF DUNMORE 1,200,000 10 (BASE PROJECT ALLOCATION - $1,000,000) 11 (DESIGN AND CONTINGENCIES - $200,000) 12 (B) GREEN RIDGE STREET FROM MAIN AVENUE TO 13 SCRANTON-DUNMORE LINE, CONSTRUCTION OF 14 STORM WATER MANAGEMENT SYSTEM, CITY OF 15 SCRANTON 1,200,000 16 (BASE PROJECT ALLOCATION - $1,000,000) 17 (DESIGN AND CONTINGENCIES - $200,000) 18 (C) GREEN RIDGE STREET FROM DUNMORE- 19 SCRANTON LINE TO BLAKELY STREET, 20 CONSTRUCTION OF STORM WATER MANAGEMENT 21 SYSTEM, BOROUGH OF DUNMORE 1,200,000 22 (BASE PROJECT ALLOCATION - $1,000,000) 23 (DESIGN AND CONTINGENCIES - $200,000) 24 (XVIII) S.R.2020 25 (A) DRINKER STREET FROM BLAKELY STREET TO 26 I-380, CONSTRUCTION OF STORM WATER 27 MANAGEMENT SYSTEM, BOROUGH OF DUNMORE 1,800,000 28 (BASE PROJECT ALLOCATION - $1,500,000) 29 (DESIGN AND CONTINGENCIES - $300,000) 30 (XIX) S.R.0307 19990H1023B3629 - 147 -
1 (A) MORGAN HIGHWAY FROM KEYSER AVENUE TO 2 ABINGTON TOWNSHIP, SCRANTON LINE, ROAD 3 RECONSTRUCTION AND CONSTRUCTION OF 4 STORM WATER MANAGEMENT SYSTEM, CITY OF 5 SCRANTON 2,000,000 6 (BASE PROJECT ALLOCATION - $1,650,000) 7 (DESIGN AND CONTINGENCIES - $350,000) 8 (XX) SAFETY IMPROVEMENTS AND SIGNALS ON THE 9 FOLLOWING STATE HIGHWAYS: S.R.2020, 10 S.R.6011, S.R.0347, S.R.3013, S.R.3010, 11 S.R.3012, S.R.3011, S.R.3033, S.R.3014, 12 S.R.3029, S.R.3003 AND S.R.0307, IN THE 13 CITY OF SCRANTON AND THE BOROUGHS OF 14 TAYLOR, THROOP AND DUNMORE 2,400,000 15 (BASE PROJECT ALLOCATION - $2,000,000) 16 (DESIGN AND CONTINGENCIES - $400,000) 17 (XXI) ACQUISITION AND INSTALLATION OF WARNING 18 DEVICES AND SAFETY IMPROVEMENTS OF HIGHWAY- 19 RAIL GRADE CROSSINGS, 20% OF THE COST OF 20 EACH SUCH ACQUISITION AND INSTALLATION 21 SHALL BE PAID BY THE COMPANY, PARTY, PERSON 22 OR PERSONS THAT OWN THE TRACT UPON WHICH 23 THE IMPROVEMENTS ARE BEING INSTALLED, CITY 24 OF SCRANTON, BOROUGHS OF TAYLOR, THROOP AND 25 DUNMORE 3,000,000 26 (BASE PROJECT ALLOCATION - $2,500,000) 27 (DESIGN AND CONTINGENCIES - $500,000) 28 (XXII) EAST MOUNTAIN ROAD 29 (A) SAFETY AND DRAINAGE IMPROVEMENT ON 30 HIGHWAY, INCLUDING SHOULDERS FROM 19990H1023B3629 - 148 -
1 MOUNTAIN LAKE ROAD TO INTERSECTION I- 2 81, CITY OF SCRANTON 6,000,000 3 (XXIII) S.R.3022 4 (A) S.R.3022, ROARING BROOK AND CENTRAL 5 CITY EXPRESSWAY, REPAIR RETAINING WALL 150,000 6 (BASE PROJECT ALLOCATION - $130,000) 7 (DESIGN AND CONTINGENCIES - $20,000) 8 (XXIV) PA 247 AND S.R.6247 9 (A) MOOSIC MOUNTAIN/VALLEY VIEW BUSINESS 10 PARK, ARCHIBALD AND JESSUP BOROUGHS, 11 JEFFERSON TOWNSHIP, WIDENING AND SAFETY 12 IMPROVEMENTS 10,400,000 13 (BASE PROJECT ALLOCATION - $8,400,000) 14 (LAND ALLOCATION - $500,000) 15 (DESIGN AND CONTINGENCIES - $1,500,000) 16 (B) SALEM ROAD WIDENING, SAFETY 17 IMPROVEMENTS AND ACCESS ROAD 1,430,000 18 (BASE PROJECT ALLOCATION - $1,300,000) 19 (DESIGN AND CONTINGENCIES - $130,000) 20 (C) VALLEYVIEW BUSINESS PARK, ARCHIBALD 21 AND JESSUP BOROUGHS, NEW CONSTRUCTION 1,760,000 22 (BASE PROJECT ALLOCATION - $1,400,000) 23 (LAND ALLOCATION - $40,000) 24 (DESIGN AND CONTINGENCIES - $320,000) 25 (XXV) I-81, I-84 AND I-380 26 (A) TRAFFIC CONTROL CENTER, DATA SYSTEM 27 AND SAFETY IMPROVEMENTS, VARIOUS 28 TOWNSHIPS TRAFFIC SAFETY IMPROVEMENTS 100,000 29 (BASE PROJECT ALLOCATION - $100,000) 30 (36) LANCASTER COUNTY 19990H1023B3629 - 149 -
1 (I) S.R.0072 AND S.R.0501 2 (A) IMPROVEMENTS TO VARIOUS SECTIONS OF 3 DOE RUN ROAD AND COLLECTOR 640,000 4 (BASE PROJECT ALLOCATION - $640,000) 5 (II) S.R.0222 6 (A) SIGNALIZATION OF INTERSECTION OF 7 S.R.0222 AND PENNSYLVANIA TURNPIKE, 8 EAST COCALICO TOWNSHIP 127,000 9 (BASE PROJECT ALLOCATION - $27,000) 10 (DESIGN AND CONTINGENCIES - $100,000) 11 (B) U.S.222 FROM BERKS COUNTY LINE TO 12 U.S.30 IN LANCASTER, PAVEMENT 13 RESTORATION, BRIDGE REHABILITATION AND 14 SAFETY IMPROVEMENTS 1,850,000 15 (BASE PROJECT ALLOCATION - $1,800,000) 16 (DESIGN AND CONTINGENCIES - $50,000) 17 (III) S.R.0441 AND S.R.0462 18 (A) SIGNALIZATION OF 6 LOCATIONS, COLUMBIA 19 BOROUGH 270,000 20 (BASE PROJECT ALLOCATION - $40,000) 21 (LAND ALLOCATION - $50,000) 22 (DESIGN AND CONTINGENCIES - $180,000) 23 (IV) S.R.0030 24 (A) U.S.30 FROM GREENLAND TO YORK COUNTY 25 LINE, PAVEMENT RESTORATION, BRIDGE 26 REHABILITATION AND SAFETY IMPROVEMENTS 1,750,000 27 (BASE PROJECT ALLOCATION - $1,700,000) 28 (DESIGN AND CONTINGENCIES - $50,000) 29 (B) U.S.30 FROM YORK COUNTY LINE TO 30 MOUNTVILLE BOROUGH, RESURFACE 1,609,000 19990H1023B3629 - 150 -
1 (BASE PROJECT ALLOCATION - $1,309,000) 2 (DESIGN AND CONTINGENCIES - $300,000) 3 (C) U.S.30 FROM MOUNTVILLE BOROUGH TO PA 4 741, RESURFACE 1,688,000 5 (BASE PROJECT ALLOCATION - $1,388,000) 6 (DESIGN AND CONTINGENCIES - $300,000) 7 (V) S.R.0283 8 (A) S.R.0283 FROM U.S.30 IN LANCASTER TO 9 DAUPHIN COUNTY LINE, PAVEMENT 10 RESTORATION, BRIDGE REHABILITATION AND 11 SAFETY IMPROVEMENTS 1,750,000 12 (BASE PROJECT ALLOCATION - $1,700,000) 13 (DESIGN AND CONTINGENCIES - $50,000) 14 (B) PA 283 FROM ELIZABETHTOWN TO PA 230, 15 RESURFACE 2,581,000 16 (BASE PROJECT ALLOCATION - $2,281,000) 17 (DESIGN AND CONTINGENCIES - $300,000) 18 (VI) PA 272 19 (A) PA 272/PA 372, BUCK INTERSECTION, EAST 20 DRUMORE TOWNSHIP, INTERSECTION 21 IMPROVEMENT 360,000 22 (BASE PROJECT ALLOCATION - $160,000) 23 (LAND ALLOCATION - $100,000) 24 (DESIGN AND CONTINGENCIES - $100,000) 25 (VII) PA 896 26 (A) PA 896 FROM STRASBURG BOROUGH TO ROUTE 27 340, ROAD WIDENING, SHOULDER WIDENINGS 28 AND SAFETY IMPROVEMENTS 4,000,000 29 (VIII) NEWCOMER ROAD 30 (A) RAPHO AND MOUNT JOY TOWNSHIPS, SAFETY 19990H1023B3629 - 151 -
1 IMPROVEMENTS 18,000 2 (BASE PROJECT ALLOCATION - $11,000) 3 (LAND ALLOCATION - $2,000) 4 (DESIGN AND CONTINGENCIES - $5,000) 5 (IX) IRISHTOWN ROAD 6 (A) CONNECTOR TO HARVEST ROAD AND NORTH 7 CHERRY LANE, LEACOCK TOWNSHIP, 8 RELOCATION 1,420,000 9 (BASE PROJECT ALLOCATION - $1,070,000) 10 (LAND ALLOCATION - $250,000) 11 (DESIGN AND CONTINGENCIES - $100,000) 12 (X) EBY CHIQUES AND NEWCOMER ROAD 13 (A) RAPHO TOWNSHIP, REALIGNMENT 1,232,000 14 (BASE PROJECT ALLOCATION - $882,000) 15 (LAND ALLOCATION - $250,000) 16 (DESIGN AND CONTINGENCIES - $100,000) 17 (37) LAWRENCE COUNTY 18 (I) S.R.0060 19 (A) S.R.0060 FROM BEAVER COUNTY LINE TO 20 MERCER COUNTY LINE, PAVEMENT 21 RESTORATION, BRIDGE REHABILITATION AND 22 SAFETY IMPROVEMENTS 1,250,000 23 (BASE PROJECT ALLOCATION - $1,200,000) 24 (DESIGN AND CONTINGENCIES - $50,000) 25 (II) S.R.0079 26 (A) I-79 FROM BUTLER COUNTY LINE TO MERCER 27 COUNTY LINE, PAVEMENT RESTORATION, 28 BRIDGE REHABILITATION AND SAFETY 29 IMPROVEMENTS 550,000 30 (BASE PROJECT ALLOCATION - $500,000) 19990H1023B3629 - 152 -
1 (DESIGN AND CONTINGENCIES - $50,000) 2 (III) S.R.0422 3 (A) U.S.422 FROM U.S.422/S.R.2004 4 INTERCHANGE TO PA 60, PAVEMENT 5 RESTORATION, BRIDGE REHABILITATION AND 6 SAFETY IMPROVEMENTS 650,000 7 (BASE PROJECT ALLOCATION - $600,000) 8 (DESIGN AND CONTINGENCIES - $50,000) 9 (IV) S.R.0018 10 (A) RESTORATION AND WIDEN S.R.0018, 11 WILMINGTON AND NESHANNOCK TOWNSHIPS 800,000 12 (BASE PROJECT ALLOCATION - $740,000) 13 (DESIGN AND CONTINGENCIES - $60,000) 14 (B) PA 18, WALLACE AVENUE TO MAITLAND 15 LANE, RESTORATION 600,000 16 (BASE PROJECT ALLOCATION - $600,000) 17 (V) S.R.0065 18 (A) WIDENING AND CONSTRUCTION TO INCLUDE A 19 THIRD LANE, WAYNE TOWNSHIP 38,000,000 20 (VI) S.R.1005 21 (A) INTERSECTION OF S.R.1005/MAITLAND LANE 22 TO MERCER COUNTY LINE, RECONSTRUCTION 600,000 23 (BASE PROJECT ALLOCATION - $600,000) 24 (B) MAITLAND LANE TO MERCER COUNTY LINE, 25 NESHANNOK AND WILMINGTON TOWNSHIPS, 26 WIDENING AND REALIGNMENT 720,000 27 (BASE PROJECT ALLOCATION - $600,000) 28 (LAND ALLOCATION - $20,000) 29 (DESIGN AND CONTINGENCIES - $100,000) 30 (VII) S.R.4014 19990H1023B3629 - 153 -
1 (A) UNION TOWNSHIP AND NEW CASTLE BOROUGH, 2 RESTORATION 700,000 3 (BASE PROJECT ALLOCATION - $700,000) 4 (38) LEBANON COUNTY 5 (I) S.R.0022 6 (A) U.S.22 FROM BERKS COUNTY LINE TO 7 DAUPHIN COUNTY LINE, PAVEMENT 8 RESTORATION, BRIDGE REHABILITATION AND 9 SAFETY IMPROVEMENTS 1,550,000 10 (BASE PROJECT ALLOCATION - $1,500,000) 11 (DESIGN AND CONTINGENCIES - $50,000) 12 (II) S.R.0078 13 (A) I-78 FROM BERKS COUNTY LINE TO DAUPHIN 14 COUNTY LINE, PAVEMENT RESTORATION, 15 BRIDGE REHABILITATION AND SAFETY 16 IMPROVEMENTS 950,000 17 (BASE PROJECT ALLOCATION - $900,000) 18 (DESIGN AND CONTINGENCIES - $50,000) 19 (III) S.R.0081 20 (A) I-81 FROM DAUPHIN COUNTY LINE TO 21 SCHUYLKILL COUNTY LINE, PAVEMENT 22 RESTORATION, BRIDGE REHABILITATION AND 23 SAFETY IMPROVEMENTS 1,550,000 24 (BASE PROJECT ALLOCATION - $1,500,000) 25 (DESIGN AND CONTINGENCIES - $50,000) 26 (IV) S.R.2001 27 (A) RECONSTRUCTION AND IMPROVEMENTS AT 28 S.R.2001 AND PA 501 INTERSECTION 401,000 29 (BASE PROJECT ALLOCATION - $401,000) 30 (39) LEHIGH COUNTY 19990H1023B3629 - 154 -
1 (I) S.R.0309 2 (A) INTERSECTION IMPROVEMENTS WITH 3 S.R.4010 400,000 4 (BASE PROJECT ALLOCATION - $240,000) 5 (LAND ALLOCATION - $80,000) 6 (DESIGN AND CONTINGENCIES - $80,000) 7 (B) S.R.0309 FROM BUCKS COUNTY LINE TO I- 8 78/I-78 TO U.S.22, PAVEMENT 9 RESTORATION, BRIDGE REHABILITATION AND 10 SAFETY IMPROVEMENTS 750,000 11 (BASE PROJECT ALLOCATION - $700,000) 12 (DESIGN AND CONTINGENCIES - $50,000) 13 (II) S.R.1003 14 (A) WIDEN, RECONSTRUCTION AND INTERSECTION 15 IMPROVEMENTS ON AIRPORT ROAD FROM 16 U.S.22 TO CONGRESS STREET 3,000,000 17 (BASE PROJECT ALLOCATION - $2,400,000) 18 (LAND ALLOCATION - $300,000) 19 (DESIGN AND CONTINGENCIES - $300,000) 20 (III) S.R.1007 21 (A) RECONSTRUCTION OF DAUPHIN STREET FROM 22 IRVING STREET TO UNION BOULEVARD 300,000 23 (BASE PROJECT ALLOCATION - $200,000) 24 (LAND ALLOCATION - $25,000) 25 (DESIGN AND CONTINGENCIES - $75,000) 26 (B) RECONSTRUCTION, INTERSECTION 27 IMPROVEMENTS AND NEW ROADWAY ON DAUPHIN 28 STREET FROM IRVING STREET TO UNION 29 BOULEVARD, AND LLOYD STREET CONNECTOR 30 FROM AIRPORT ROAD TO EXISTING LLOYD 19990H1023B3629 - 155 -
1 STREET 3,900,000 2 (BASE PROJECT ALLOCATION - $2,800,000) 3 (LAND ALLOCATION - $525,000) 4 (DESIGN AND CONTINGENCIES - $575,000) 5 (IV) S.R.9900 6 (A) LLOYD STREET CONNECTOR FROM AIRPORT 7 ROAD TO EXISTING LLOYD STREET, NEW 8 ROADWAY 3,600,000 9 (BASE PROJECT ALLOCATION - $2,600,000) 10 (LAND ALLOCATION - $500,000) 11 (DESIGN AND CONTINGENCIES - $500,000) 12 (V) AMERICAN PARKWAY 13 (A) FOUR-LANE RELOCATION OF AMERICAN 14 PARKWAY BETWEEN AMERICAN BOULEVARD AND 15 S.R.0987 12,540,000 16 (BASE PROJECT ALLOCATION - $11,280,000) 17 (LAND ALLOCATION - $450,000) 18 (DESIGN AND CONTINGENCIES - $810,000) 19 (B) AMERICAN BOULEVARD NORTHEAST TO 20 S.R.0987, CITY OF ALLENTOWN 12,540,000 21 (BASE PROJECT ALLOCATION - $11,280,000) 22 (LAND ALLOCATION - $450,000) 23 (DESIGN AND CONTINGENCIES - $810,000) 24 (VI) S.R.0022 25 (A) U.S.22 FROM NORTHAMPTON COUNTY LINE TO 26 I-78 JUNCTION, PAVEMENT RESTORATION, 27 BRIDGE REHABILITATION AND SAFETY 28 IMPROVEMENTS 1,050,000 29 (BASE PROJECT ALLOCATION - $1,000,000) 30 (DESIGN AND CONTINGENCIES - $50,000) 19990H1023B3629 - 156 -
1 (VII) S.R.0078 2 (A) I-78 FROM NORTHAMPTON COUNTY LINE TO 3 BERKS COUNTY LINE, PAVEMENT 4 RESTORATION, BRIDGE REHABILITATION AND 5 SAFETY IMPROVEMENTS 1,950,000 6 (BASE PROJECT ALLOCATION - $1,900,000) 7 (DESIGN AND CONTINGENCIES - $50,000) 8 (VIII) S.R.0378 9 (A) S.R.0378 FROM NORTHAMPTON COUNTY LINE 10 TO U.S.22, PAVEMENT RESTORATION, BRIDGE 11 REHABILITATION AND SAFETY IMPROVEMENTS 450,000 12 (BASE PROJECT ALLOCATION - $400,000) 13 (DESIGN AND CONTINGENCIES - $50,000) 14 (40) LUZERNE COUNTY 15 (I) S.R.0093 16 (A) IMPROVEMENTS TO BROAD STREET, CITY OF 17 HAZLETON 1,682,000 18 (BASE PROJECT ALLOCATION - $1,346,000) 19 (DESIGN AND CONTINGENCIES - $336,000) 20 (II) S.R.0011 21 (A) U.S.11 FROM I-81 AIRPORT TO S.R.2021, 22 PAVEMENT RESTORATION, BRIDGE 23 REHABILITATION AND SAFETY IMPROVEMENTS 350,000 24 (BASE PROJECT ALLOCATION - $300,000) 25 (DESIGN AND CONTINGENCIES - $50,000) 26 (III) S.R.0029 27 (A) S.R.0029 FROM I-81 ASHLEY TO U.S.11 28 WEST NANTICOKE, PAVEMENT RESTORATION, 29 BRIDGE REHABILITATION AND SAFETY 30 IMPROVEMENTS 2,000,000 19990H1023B3629 - 157 -
1 (BASE PROJECT ALLOCATION - $1,940,000) 2 (DESIGN AND CONTINGENCIES - $60,000) 3 (IV) S.R.0080 4 (A) I-80 FROM MONROE COUNTY LINE TO 5 COLUMBIA COUNTY LINE, PAVEMENT 6 RESTORATION, BRIDGE REHABILITATION AND 7 SAFETY IMPROVEMENTS 2,650,000 8 (BASE PROJECT ALLOCATION - $2,600,000) 9 (DESIGN AND CONTINGENCIES - $50,000) 10 (B) I-80, EASTBOUND/WESTBOUND LANES, 11 PAVEMENT RESTORATION 400,000 12 (BASE PROJECT ALLOCATION - $380,000) 13 (DESIGN AND CONTINGENCIES - $20,000) 14 (V) S.R.0081 15 (A) I-81 FROM SCHUYLKILL COUNTY LINE TO 16 LACKAWANNA COUNTY LINE, PAVEMENT 17 RESTORATION, BRIDGE REHABILITATION AND 18 SAFETY IMPROVEMENTS 3,950,000 19 (BASE PROJECT ALLOCATION - $3,900,000) 20 (DESIGN AND CONTINGENCIES - $50,000) 21 (B) I-81, RECONSTRUCT EXIT 49, AVOCA 22 BOROUGH, INTERCHANGE IMPROVEMENT 2,000,000 23 (BASE PROJECT ALLOCATION - $1,600,000) 24 (LAND ALLOCATION - $200,000) 25 (DESIGN AND CONTINGENCIES - $200,000) 26 (VI) S.R.0309 27 (A) S.R.0309 FROM I-81 WILKES-BARRE TO 28 TRUCKSVILLE, PAVEMENT RESTORATION, 29 BRIDGE REHABILITATION AND SAFETY 30 IMPROVEMENTS 650,000 19990H1023B3629 - 158 -
1 (BASE PROJECT ALLOCATION - $600,000) 2 (DESIGN AND CONTINGENCIES - $50,000) 3 (B) CONSTRUCTION OF 3,500 LINEAR FEET OF 4 SOUND BARRIER ON THE NORTH SIDE OF 5 S.R.0309 BETWEEN EXIT 1 AND EXIT 2, 6 CITY OF WILKES-BARRE 3,000,000 7 (C) PA 309, EXIT 4 TO EXIT 5, RESTORATION 450,000 8 (BASE PROJECT ALLOCATION - $420,000) 9 (DESIGN AND CONTINGENCIES - $30,000) 10 (D) PA 309 AND AIRPORT ROAD, HAZLE 11 TOWNSHIP, IMPROVE INTERSECTION 260,000 12 (BASE PROJECT ALLOCATION - $200,000) 13 (LAND ALLOCATION - $20,000) 14 (DESIGN AND CONTINGENCIES - $40,000) 15 (VII) S.R.2021 16 (A) S.R.2021 FROM U.S.11 CORK LANE TO 17 SABASTOPOL, PAVEMENT RESTORATION, 18 BRIDGE REHABILITATION AND SAFETY 19 IMPROVEMENTS 250,000 20 (BASE PROJECT ALLOCATION - $200,000) 21 (DESIGN AND CONTINGENCIES - $50,000) 22 (VIII) PA 239 23 (A) MOCANAQUA ROCK REMOVAL, MOCANAQUA 24 BOROUGH, ROCK EMBANKMENT REMOVAL 240,000 25 (BASE PROJECT ALLOCATION - $200,000) 26 (LAND ALLOCATION - $20,000) 27 (DESIGN AND CONTINGENCIES - $20,000) 28 (IX) PA 115 29 (A) PA 115 AND MEADOW RUN, BEAR CREEK 30 TOWNSHIP, INTERSECTION IMPROVEMENT 120,000 19990H1023B3629 - 159 -
1 (BASE PROJECT ALLOCATION - $80,000) 2 (LAND ALLOCATION - $20,000) 3 (DESIGN AND CONTINGENCIES - $20,000) 4 (X) S.R.3026 5 (A) AIRPORT BELTWAY, HAZLETON BOROUGH, 6 WIDENING 860,000 7 (BASE PROJECT ALLOCATION - $800,000) 8 (LAND ALLOCATION - $20,000) 9 (DESIGN AND CONTINGENCIES - $40,000) 10 (XI) I-81 AND I-80 11 (A) PORTABLE MESSAGE BOARDS, DATA SYSTEM 12 AND SAFETY IMPROVEMENT, VARIOUS 13 TOWNSHIPS, TRAFFIC SAFETY IMPROVEMENTS 110,000 14 (BASE PROJECT ALLOCATION - $110,000) 15 (XII) COAL STREET REALIGNMENT 16 (A) WILKES-BARRE CITY, RESTORATION, NEW 17 CONSTRUCTION 1,610,000 18 (BASE PROJECT ALLOCATION - $1,400,000) 19 (LAND ALLOCATION - $50,000) 20 (DESIGN AND CONTINGENCIES - $160,000) 21 (41) LYCOMING COUNTY 22 (I) S.R.0180 23 (A) I-180 RESTORATION AND IMPROVEMENTS 24 FROM HALLS STATION INTERCHANGE TO SOUTH 25 MUNCY INTERCHANGE AND U.S.220/S.R.2036 26 INTERCHANGE 956,000 27 (BASE PROJECT ALLOCATION - $899,000) 28 (DESIGN AND CONTINGENCIES - $57,000) 29 (B) I-180 FROM NORTHUMBERLAND COUNTY LINE 30 TO U.S.15, PAVEMENT RESTORATION, BRIDGE 19990H1023B3629 - 160 -
1 REHABILITATION AND SAFETY IMPROVEMENTS 2,050,000 2 (BASE PROJECT ALLOCATION - $2,000,000) 3 (DESIGN AND CONTINGENCIES - $50,000) 4 (II) S.R.0015 5 (A) U.S.15 FROM WILLIAMSPORT TO TIOGA 6 COUNTY LINE, PAVEMENT RESTORATION, 7 BRIDGE REHABILITATION AND SAFETY 8 IMPROVEMENTS 2,050,000 9 (BASE PROJECT ALLOCATION - $2,000,000) 10 (DESIGN AND CONTINGENCIES - $50,000) 11 (B) SOUTH WILLIAMSPORT TO LYCOMING/UNION 12 COUNTY LINE, ROADWAY RECONSTRUCTION, 13 SAFETY IMPROVEMENTS 3,150,000 14 (BASE PROJECT ALLOCATION - $3,000,000) 15 (LAND ALLOCATION - $50,000) 16 (DESIGN AND CONTINGENCIES - $100,000) 17 (III) S.R.0220 18 (A) U.S.220 FROM WILLIAMSPORT TO 19 NISBIT/LARRYS CORNER TO CLINTON COUNTY, 20 PAVEMENT RESTORATION, BRIDGE 21 REHABILITATION AND SAFETY IMPROVEMENTS 850,000 22 (BASE PROJECT ALLOCATION - $800,000) 23 (DESIGN AND CONTINGENCIES - $50,000) 24 (B) U.S.220, FROM INTERSECTION WITH PA 287 25 TO WILLIAMSPORT BELTWAY, WOODWARD 26 TOWNSHIP, FOUR-LANE DIVIDED 27 RELOCATION/RECONSTRUCTION AND SAFETY 28 IMPROVEMENT 3,778,000 29 (BASE PROJECT ALLOCATION - $3,251,000) 30 (LAND ALLOCATION - $294,000) 19990H1023B3629 - 161 -
1 (DESIGN AND CONTINGENCIES - $233,000) 2 (C) U.S.220, 4TH STREET RAMP, JERSEY SHORE 3 BOROUGH, SAFETY IMPROVEMENT 70,000 4 (DESIGN AND CONTINGENCIES - $70,000) 5 (D) CITY OF WILLIAMSPORT AND WOODWARD 6 TOWNSHIP, JUNCTION OF U.S.220 AND 7 S.R.2014 2,500,000 8 (BASE PROJECT ALLOCATION - $2,000,000) 9 (LAND ALLOCATION - $200,000) 10 (DESIGN AND CONTINGENCIES - $300,000) 11 (E) CITY OF WILLIAMSPORT TO JERSEY SHORE, 12 UPGRADE TO DIVIDED LIMITED-ACCESS 20,000,000 13 (BASE PROJECT ALLOCATION - $16,300,000) 14 (LAND ALLOCATION - $1,500,000) 15 (DESIGN AND CONTINGENCIES - $2,200,000) 16 (IV) S.R.0414 17 (A) BROWN TOWNSHIP, CEDAR RUN NARROWS, 18 ROADWAY RECONSTRUCTION, RETAINING WALL 3,700,000 19 (BASE PROJECT ALLOCATION - $2,400,000) 20 (LAND ALLOCATION - $300,000) 21 (DESIGN AND CONTINGENCIES - $1,000,000) 22 (V) TRENTON AVENUE CONNECTOR 23 (A) TRENTON AVENUE CONNECTOR, CITY OF 24 WILLIAMSPORT INDUSTRIAL PARK ACCESS 25 ROAD 4,500,000 26 (42) MCKEAN COUNTY 27 (I) S.R.0219 28 (A) UPGRADE OF BRADFORD BYPASS NORTH AND 29 SOUTH OF BRADFORD 8,320,000 30 (BASE PROJECT ALLOCATION - $7,600,000) 19990H1023B3629 - 162 -
1 (DESIGN AND CONTINGENCIES - $720,000) 2 (B) U.S.219 FROM SOUTH BRADFORD TO NEW 3 YORK STATE LINE, PAVEMENT RESTORATION, 4 BRIDGE REHABILITATION AND SAFETY 5 IMPROVEMENTS 550,000 6 (BASE PROJECT ALLOCATION - $500,000) 7 (DESIGN AND CONTINGENCIES - $50,000) 8 (II) S.R.0060 9 (A) S.R.0060 FROM LAWRENCE COUNTY LINE TO 10 PA 18 INTERSECTION, PAVEMENT 11 RESTORATION, BRIDGE REHABILITATION AND 12 SAFETY IMPROVEMENTS 650,000 13 (BASE PROJECT ALLOCATION - $600,000) 14 (DESIGN AND CONTINGENCIES - $50,000) 15 (III) S.R.0079 16 (A) I-79 FROM LAWRENCE COUNTY LINE TO 17 CRAWFORD COUNTY LINE, PAVEMENT 18 RESTORATION, BRIDGE REHABILITATION AND 19 SAFETY IMPROVEMENTS 2,650,000 20 (BASE PROJECT ALLOCATION - $2,600,000) 21 (DESIGN AND CONTINGENCIES - $50,000) 22 (IV) S.R.0080 23 (A) I-80 FROM VENANGO COUNTY LINE TO OHIO 24 STATE LINE, PAVEMENT RESTORATION, 25 BRIDGE REHABILITATION AND SAFETY 26 IMPROVEMENTS 2,850,000 27 (BASE PROJECT ALLOCATION - $2,800,000) 28 (DESIGN AND CONTINGENCIES - $50,000) 29 (V) PA 59 30 (A) PA 59, INTERSECTION OF PA 59 AND PA 19990H1023B3629 - 163 -
1 770, LAFAYETTE TOWNSHIP, INTERSECTION 2 IMPROVEMENT 190,000 3 (BASE PROJECT ALLOCATION - $160,000) 4 (LAND ALLOCATION - $10,000) 5 (DESIGN AND CONTINGENCIES - $20,000) 6 (43) MERCER COUNTY 7 (I) I-79 8 (A) I-79, LAWRENCE COUNTY LINE TO CITY OF 9 ERIE, PAVEMENT AND SAFETY IMPROVEMENTS 11,660,000 10 (BASE PROJECT ALLOCATION - $10,600,000) 11 (DESIGN AND CONTINGENCIES - $1,060,000) 12 (II) S.R.3014 13 (A) S.R.3014, PA 18 TO BUHL BOULEVARD, ADD 14 TURN LANE 860,000 15 (BASE PROJECT ALLOCATION - $520,000) 16 (LAND ALLOCATION - $320,000) 17 (DESIGN AND CONTINGENCIES - $20,000) 18 (III) S.R.0018 19 (A) INTERSECTION IMPROVEMENTS AND 20 UPGRADING OF MAIN STREET, BOROUGH OF 21 GREENVILLE 1,191,000 22 (BASE PROJECT ALLOCATION - $979,000) 23 (DESIGN AND CONTINGENCIES - $212,000) 24 (44) MIFFLIN COUNTY 25 (I) S.R.0322 26 (A) U.S.322 FROM 322/22 SPLIT OF CENTRE 27 COUNTY LINE, PAVEMENT RESTORATION, 28 BRIDGE REHABILITATION AND SAFETY 29 IMPROVEMENTS 1,650,000 30 (BASE PROJECT ALLOCATION - $1,600,000) 19990H1023B3629 - 164 -
1 (DESIGN AND CONTINGENCIES - $50,000) 2 (45) MONROE COUNTY 3 (I) S.R.0033 4 (A) S.R.0033 FROM NORTHAMPTON COUNTY LINE 5 TO I-80, PAVEMENT RESTORATION, BRIDGE 6 REHABILITATION AND SAFETY IMPROVEMENTS 1,150,000 7 (BASE PROJECT ALLOCATION - $1,100,000) 8 (DESIGN AND CONTINGENCIES - $50,000) 9 (II) S.R.0080 10 (A) I-80 FROM NEW JERSEY STATE LINE TO 11 CARBON COUNTY LINE, PAVEMENT 12 RESTORATION, BRIDGE REHABILITATION AND 13 SAFETY IMPROVEMENTS 2,850,000 14 (BASE PROJECT ALLOCATION - $2,800,000) 15 (DESIGN AND CONTINGENCIES - $50,000) 16 (B) I-80 EXIT 51/FORGE ROAD/PROSPECT 17 STREET/EAST BROWN STREET INTERCHANGE 18 RECONFIGURATION, EAST STROUDSBURG 4,500,000 19 (BASE PROJECT ALLOCATION - $3,700,000) 20 (LAND ALLOCATION - $500,000) 21 (DESIGN AND CONTINGENCIES - $300,000) 22 (C) I-80 EXIT 52 INTERCHANGE IMPROVEMENTS 12,000,000 23 (BASE PROJECT ALLOCATION - $10,000,000) 24 (LAND ALLOCATION - $1,000,000) 25 (DESIGN AND CONTINGENCIES - $1,000,000) 26 (D) I-80 AND STONY HOLLOW ROAD, NEW 27 INTERCHANGE 11,500,000 28 (BASE PROJECT ALLOCATION - $10,000,000) 29 (DESIGN AND CONTINGENCIES - $1,500,000) 30 (E) DELAWARE WATER GAP WELCOME CENTER I- 19990H1023B3629 - 165 -
1 80 10,000,000 2 (BASE PROJECT ALLOCATION - $7,600,000) 3 (LAND ALLOCATION - $400,000) 4 (DESIGN AND CONTINGENCIES - $2,000,000) 5 (III) S.R.0209 6 (A) U.S.209 FROM PA 33 SPLIT TO I-80, 7 PAVEMENT RESTORATION, BRIDGE 8 REHABILITATION AND SAFETY IMPROVEMENTS 450,000 9 (BASE PROJECT ALLOCATION - $400,000) 10 (DESIGN AND CONTINGENCIES - $50,000) 11 (B) I-80 TO MARSHALLS CREEK RECONSTRUCTION 12 AND WIDENING 3,400,000 13 (BASE PROJECT ALLOCATION - $3,000,000) 14 (LAND ALLOCATION - $200,000) 15 (DESIGN AND CONTINGENCIES - $200,000) 16 (IV) S.R.0611 17 (A) ENHANCE MOBILITY AND IMPROVE SAFETY, 18 1,000 FEET SOUTH OF S.R.2106 TO 1,200 19 FEET NORTH OF S.R.0033 IN STROUD 20 TOWNSHIP 24,900,000 21 (BASE PROJECT ALLOCATION - $14,000,000) 22 (LAND ALLOCATION - $7,400,000) 23 (DESIGN AND CONTINGENCIES - $3,500,000) 24 (V) S.R.0380 25 (A) I-380 FROM I-80 TO LACKAWANNA COUNTY 26 LINE, PAVEMENT RESTORATION, BRIDGE 27 REHABILITATION AND SAFETY IMPROVEMENTS 1,450,000 28 (BASE PROJECT ALLOCATION - $1,400,000) 29 (DESIGN AND CONTINGENCIES - $50,000) 30 (46) MONTGOMERY COUNTY 19990H1023B3629 - 166 -
1 (I) S.R.0030 2 (A) IMPROVEMENTS TO CLOSED LOOP, CITY 3 AVENUE TO COUNTY LINE ROAD, LOWER 4 MERION TOWNSHIP 112,000 5 (BASE PROJECT ALLOCATION - $100,000) 6 (LAND ALLOCATION - $12,000) 7 (II) S.R.0073 8 (A) INTERSECTION IMPROVEMENT AT WILLOW 9 GROVE, CHELTENHAM TOWNSHIP 290,000 10 (BASE PROJECT ALLOCATION - $270,000) 11 (LAND ALLOCATION - $20,000) 12 (III) S.R.0663 13 (A) IMPROVEMENTS OF SWAMP PARK 14 INTERSECTION WITH LAYFIELD, NEW HANOVER 15 TOWNSHIP 1,133,000 16 (BASE PROJECT ALLOCATION - $950,000) 17 (LAND ALLOCATION - $75,000) 18 (DESIGN AND CONTINGENCIES - $108,000) 19 (IV) S.R.0076 20 (A) I-76 FROM PHILADELPHIA COUNTY LINE TO 21 CHESTER COUNTY LINE, PAVEMENT 22 RESTORATION, BRIDGE REHABILITATION AND 23 SAFETY IMPROVEMENTS 1,350,000 24 (BASE PROJECT ALLOCATION - $1,300,000) 25 (DESIGN AND CONTINGENCIES - $50,000) 26 (V) S.R.0309 27 (A) S.R.0309 FROM CEDARBROOK TO S.R.2018, 28 PAVEMENT RESTORATION, BRIDGE 29 REHABILITATION AND SAFETY IMPROVEMENTS 950,000 30 (BASE PROJECT ALLOCATION - $900,000) 19990H1023B3629 - 167 -
1 (DESIGN AND CONTINGENCIES - $50,000) 2 (VI) S.R.0422 3 (A) U.S.422 FROM CHESTER COUNTY LINE TO 4 BERKS COUNTY LINE, PAVEMENT 5 RESTORATION, BRIDGE REHABILITATION AND 6 SAFETY IMPROVEMENTS 3,160,000 7 (BASE PROJECT ALLOCATION - $3,000,000) 8 (LAND ALLOCATION - $60,000) 9 (DESIGN AND CONTINGENCIES - $100,000) 10 (VII) S.R.0476 11 (A) I-476 FROM DELAWARE COUNTY LINE TO 12 BUCKS COUNTY LINE, PAVEMENT 13 RESTORATION, BRIDGE REHABILITATION AND 14 SAFETY IMPROVEMENTS 650,000 15 (BASE PROJECT ALLOCATION - $600,000) 16 (DESIGN AND CONTINGENCIES - $50,000) 17 (VIII) UPPER PERKIOMEN INDUSTRIAL ACCESS 18 HIGHWAY 19 (A) CONSTRUCTION OF A NEW INDUSTRIAL 20 ACCESS HIGHWAY IN UPPER HANOVER 21 TOWNSHIP 8,000,000 22 (BASE PROJECT ALLOCATION - $6,000,000) 23 (LAND ALLOCATION - $500,000) 24 (DESIGN AND CONTINGENCIES - $1,500,000) 25 (IX) S.R.0363 26 (A) PA 363, SUMNEYTOWN PIKE AT PA 363 27 INTERSECTION, TOWAMENCIN AND UPPER 28 GWYNEDD TOWNSHIPS, INTERSECTION 29 IMPROVEMENT 1,344,000 30 (BASE PROJECT ALLOCATION - $1,344,000) 19990H1023B3629 - 168 -
1 (X) S.R.9900 2 (A) PA 9900, FORT WASHINGTON IMPROVEMENTS, 3 UPPER DUBLIN TOWNSHIP, VARIOUS 4 RECONSTRUCTION AND SAFETY IMPROVEMENT 196,000 5 (BASE PROJECT ALLOCATION - $175,000) 6 (LAND ALLOCATION - $4,000) 7 (DESIGN AND CONTINGENCIES - $17,000) 8 (B) PA 9900, BUTLER PIKE AT FLOURTOWN 9 ROAD, PLYMOUTH AND WHITEMARSH 10 TOWNSHIPS, INTERSECTION IMPROVEMENT 220,000 11 (BASE PROJECT ALLOCATION - $200,000) 12 (LAND ALLOCATION - $20,000) 13 (47) MONTOUR COUNTY 14 (I) S.R.0080 15 (A) I-80 FROM COLUMBIA COUNTY LINE TO 16 NORTHUMBERLAND COUNTY LINE, PAVEMENT 17 RESTORATION, BRIDGE REHABILITATION AND 18 SAFETY IMPROVEMENTS 1,250,000 19 (BASE PROJECT ALLOCATION - $1,200,000) 20 (DESIGN AND CONTINGENCIES - $50,000) 21 (II) U.S.11 22 (A) U.S.11, WALNUT STREET AND MONTOUR 23 BOULEVARD, RESTORATION 650,000 24 (BASE PROJECT ALLOCATION - $350,000) 25 (DESIGN AND CONTINGENCIES - $300,000) 26 (48) NORTHAMPTON COUNTY 27 (I) S.R.0022 28 (A) U.S.22 FROM NEW JERSEY STATE LINE TO 29 LEHIGH COUNTY LINE, PAVEMENT 30 RESTORATION, BRIDGE REHABILITATION AND 19990H1023B3629 - 169 -
1 SAFETY IMPROVEMENTS 1,250,000 2 (BASE PROJECT ALLOCATION - $1,200,000) 3 (DESIGN AND CONTINGENCIES - $50,000) 4 (II) S.R.0033 5 (A) S.R.0033 FROM U.S.22 TO MONROE COUNTY 6 LINE, PAVEMENT RESTORATION, BRIDGE 7 REHABILITATION AND SAFETY IMPROVEMENTS 1,350,000 8 (BASE PROJECT ALLOCATION - $1,300,000) 9 (DESIGN AND CONTINGENCIES - $50,000) 10 (III) S.R.0078 11 (A) I-78 FROM NEW JERSEY STATE LINE TO 12 LEHIGH COUNTY LINE, PAVEMENT 13 RESTORATION, BRIDGE REHABILITATION AND 14 SAFETY IMPROVEMENTS 1,250,000 15 (BASE PROJECT ALLOCATION - $1,200,000) 16 (DESIGN AND CONTINGENCIES - $50,000) 17 (49) NORTHUMBERLAND COUNTY 18 (I) S.R.0061 19 (A) PA 61/PA 225 INTERSECTION, SHAMOKIN 20 AND COAL TOWNSHIPS, INTERSECTION 21 IMPROVEMENT AND NEW BRIDGE 2,360,000 22 (BASE PROJECT ALLOCATION - $1,800,000) 23 (LAND ALLOCATION - $200,000) 24 (DESIGN AND CONTINGENCIES - $360,000) 25 (B) MILL AND RESURFACE S.R.0061 FROM 26 S.R.4006 TO S.R.0890 300,000 27 (C) HAMILTON UNDERPASS, CITY OF SUNBURY 28 AND UPPER AUGUSTA TOWNSHIP, 29 RECONSTRUCTION AND/OR RELOCATION OF 30 S.R.0061 FROM MARKET STREET IN SUNBURY 19990H1023B3629 - 170 -
1 TO S.R.0890 IN UPPER AUGUSTA TOWNSHIP 6,000,000 2 (BASE PROJECT ALLOCATION - $5,000,000) 3 (LAND ALLOCATION - $500,000) 4 (DESIGN AND CONTINGENCIES - $500,000) 5 (II) S.R.0080 6 (A) I-80 FROM MONTOUR COUNTY LINE TO UNION 7 COUNTY LINE, PAVEMENT RESTORATION, 8 BRIDGE REHABILITATION AND SAFETY 9 IMPROVEMENTS 650,000 10 (BASE PROJECT ALLOCATION - $600,000) 11 (DESIGN AND CONTINGENCIES - $50,000) 12 (III) S.R.0180 13 (A) I-180 FROM I-80 TO LYCOMING COUNTY 14 LINE, PAVEMENT RESTORATION, BRIDGE 15 REHABILITATION AND SAFETY IMPROVEMENTS 950,000 16 (BASE PROJECT ALLOCATION - $900,000) 17 (DESIGN AND CONTINGENCIES - $50,000) 18 (B) RESURFACE, SHOULDER PAVEMENT AND GUIDE 19 RAIL UPGRADE ON SECTION 049 4,400,000 20 (C) I-180, FROM LYCOMING COUNTY LINE TO PA 21 54 INTERCHANGE, RESTORATION 518,000 22 (BASE PROJECT ALLOCATION - $480,000) 23 (DESIGN AND CONTINGENCIES - $38,000) 24 (IV) S.R.0147 25 (A) MILL AND RESURFACE S.R.0147, SECTION 26 63M 780,000 27 (V) S.R.0405 28 (A) MILL AND RESURFACE S.R.0405 FROM 29 CAMERON AVENUE INTERSECTION TO SEGMENT 30 0231/1537 900,000 19990H1023B3629 - 171 -
1 (VI) S.R.0487 2 (A) MILL AND RESURFACE, SHOULDER PAVEMENT 3 AND GUIDE RAIL UPGRADE ON S.R.0487 FROM 4 TIMBER CREEK RESTAURANT TO S.R.0054 IN 5 ELYSBURG 430,000 6 (B) PA 61/PA 487 TO 700 FEET EAST OF PA 7 487/S.R.4012, SHAMOKIN TOWNSHIP, 8 RESTORATION 404,000 9 (BASE PROJECT ALLOCATION - $224,000) 10 (LAND ALLOCATION - $30,000) 11 (DESIGN AND CONTINGENCIES - $150,000) 12 (VII) S.R.0054 13 (A) RIVERSIDE BOROUGH AND RUSH TOWNSHIP, 14 WIDEN FROM THE RIVERSIDE BOROUGH/RUSH 15 TOWNSHIP LINE TO THE INTERSECTION OF 16 S.R.2002 AND S.R.2003 WITH S.R.0054 3,200,000 17 (BASE PROJECT ALLOCATION - $2,600,000) 18 (LAND ALLOCATION - $100,000) 19 (DESIGN AND CONTINGENCIES - $500,000) 20 (VIII) BELFORD BOULEVARD 21 (A) BELFORD BOULEVARD, MILTON BOROUGH AND 22 WEST CHILLISQUAQUE TOWNSHIP, NEW 2-LANE 23 ACCESS ROAD LYING EAST AND WEST OF 24 S.R.1031, HOUSEL RUN ROAD 1,000,000 25 (BASE PROJECT ALLOCATION - $600,000) 26 (DESIGN AND CONTINGENCIES - $400,000) 27 (B) EAST AND WEST OF HOUSEL RUN ROAD, 28 CONSTRUCT A NEW 2-LANE ROADWAY 269,000 29 (BASE PROJECT ALLOCATION - $269,000) 30 (50) PERRY COUNTY 19990H1023B3629 - 172 -
1 (I) S.R.0011 2 (A) U.S.11 FROM SPUR LANE TO AMITY HALL, 3 PAVEMENT RESTORATION, BRIDGE 4 REHABILITATION AND SAFETY IMPROVEMENTS 550,000 5 (BASE PROJECT ALLOCATION - $500,000) 6 (DESIGN AND CONTINGENCIES - $50,000) 7 (B) S.R.0011, RESURFACE ROADWAY BETWEEN 8 S.R.0081 AND PERDIX 1,880,000 9 (BASE PROJECT ALLOCATION - $1,850,000) 10 (DESIGN AND CONTINGENCIES - $30,000) 11 (II) S.R.0022 12 (A) U.S.22, SOUTH OF NEWPORT TO DAUPHIN 13 COUNTY LINE, RESTORATION 2,001,000 14 (BASE PROJECT ALLOCATION - $1,701,000) 15 (DESIGN AND CONTINGENCIES - $300,000) 16 (III) DUNCANNON BOROUGH 17 (A) DUNCANNON BOROUGH, REBUILD SUBWAY TO 18 CORRECT DRAINAGE PROBLEM 2,750,000 19 (BASE PROJECT ALLOCATION - $2,000,000) 20 (LAND ALLOCATION - $400,000) 21 (DESIGN AND CONTINGENCIES - $350,000) 22 (51) PHILADELPHIA COUNTY 23 (I) S.R.0076 24 (A) INCIDENT MANAGEMENT ON I-76 WEST 25 BETWEEN I-676 WEST AND CITY AVENUE 26 INTERCHANGE, CITY OF PHILADELPHIA 800,000 27 (BASE PROJECT ALLOCATION - $710,000) 28 (LAND ALLOCATION - $10,000) 29 (DESIGN AND CONTINGENCIES - $80,000) 30 (B) I-76 FROM WALT WHITMAN BRIDGE TO 19990H1023B3629 - 173 -
1 MONTGOMERY COUNTY LINE, PAVEMENT 2 RESTORATION, BRIDGE REHABILITATION AND 3 SAFETY IMPROVEMENTS 850,000 4 (BASE PROJECT ALLOCATION - $800,000) 5 (DESIGN AND CONTINGENCIES - $50,000) 6 (II) S.R.0001 7 (A) U.S.1 FROM HUNTING PARK TO I-76, 8 PAVEMENT RESTORATION, BRIDGE 9 REHABILITATION AND SAFETY IMPROVEMENTS 350,000 10 (BASE PROJECT ALLOCATION - $300,000) 11 (DESIGN AND CONTINGENCIES - $50,000) 12 (B) U.S.1, TWIN BRIDGE TO NINTH STREET, 13 CITY OF PHILADELPHIA, RESTORATION 5,400,000 14 (BASE PROJECT ALLOCATION - $5,000,000) 15 (LAND ALLOCATION - $40,000) 16 (DESIGN AND CONTINGENCIES - $360,000) 17 (III) S.R.0095 18 (A) I-95 FROM DELAWARE STATE LINE TO NEW 19 JERSEY STATE LINE, PAVEMENT 20 RESTORATION, BRIDGE REHABILITATION AND 21 SAFETY IMPROVEMENTS 2,250,000 22 (BASE PROJECT ALLOCATION - $2,200,000) 23 (DESIGN AND CONTINGENCIES - $50,000) 24 (IV) S.R.0676 25 (A) I-676 FROM I-95 TO I-76, PAVEMENT 26 RESTORATION, BRIDGE REHABILITATION AND 27 SAFETY IMPROVEMENTS 250,000 28 (BASE PROJECT ALLOCATION - $200,000) 29 (DESIGN AND CONTINGENCIES - $50,000) 30 (V) S.R.0063 19990H1023B3629 - 174 -
1 (A) S.R.0063 FROM NEW JERSEY STATE LINE TO 2 U.S.1 JUNCTION, PAVEMENT RESTORATION, 3 BRIDGE REHABILITATION AND SAFETY 4 IMPROVEMENTS 350,000 5 (BASE PROJECT ALLOCATION - $300,000) 6 (DESIGN AND CONTINGENCIES - $50,000) 7 (VI) INTELLIGENT TRANSPORTATION SYSTEMS 8 (A) CONSTRUCT INTELLIGENT TRANSPORTATION 9 SYSTEMS THROUGHOUT THE PHILADELPHIA 10 AREA 500,000 11 (BASE PROJECT ALLOCATION - $500,000) 12 (VII) S.R.3007 13 (A) S.R.3007, ART MUSEUM TO GUSTINE LAKE, 14 CITY OF PHILADELPHIA, LIGHTING AND 15 SAFETY IMPROVEMENTS 265,000 16 (BASE PROJECT ALLOCATION - $240,000) 17 (DESIGN AND CONTINGENCIES - $25,000) 18 (VIII) S.R.4007 19 (A) S.R.4007, ALLENS LANE TO CRESHEIM 20 VALLEY DRIVE, CITY OF PHILADELPHIA, 21 RECONSTRUCTION 880,000 22 (BASE PROJECT ALLOCATION - $800,000) 23 (DESIGN AND CONTINGENCIES - $80,000) 24 (52) PIKE COUNTY 25 (I) S.R.0084 26 (A) I-84 FROM NEW JERSEY STATE LINE TO 27 WAYNE COUNTY LINE, PAVEMENT 28 RESTORATION, BRIDGE REHABILITATION AND 29 SAFETY IMPROVEMENTS 3,550,000 30 (BASE PROJECT ALLOCATION - $3,500,000) 19990H1023B3629 - 175 -
1 (DESIGN AND CONTINGENCIES - $50,000) 2 (B) WAYNE COUNTY TO DELAWARE RIVER, 3 OVERHEAD SIGN STRUCTURES 34,000 4 (BASE PROJECT ALLOCATION - $34,000) 5 (II) S.R.1001 6 (A) WELL ROAD RELOCATION, BLOOMING GROVE 7 TOWNSHIP, RELOCATION 395,000 8 (BASE PROJECT ALLOCATION - $300,000) 9 (LAND ALLOCATION - $20,000) 10 (DESIGN AND CONTINGENCIES - $75,000) 11 (III) PA 590 12 (A) PALMYRA TOWNSHIP, SAFETY IMPROVEMENT 100,000 13 (BASE PROJECT ALLOCATION - $80,000) 14 (DESIGN AND CONTINGENCIES - $20,000) 15 (IV) PA 739 16 (A) DELAWARE TOWNSHIP, ROADWAY 17 IMPROVEMENTS 130,000 18 (BASE PROJECT ALLOCATION - $100,000) 19 (DESIGN AND CONTINGENCIES - $30,000) 20 (V) U.S.6 21 (A) MILFORD AND MATAMORAS BOROUGHS, 22 MILFORD AND WESTFALL TOWNSHIPS, ROADWAY 23 IMPROVEMENTS 450,000 24 (BASE PROJECT ALLOCATION - $400,000) 25 (LAND ALLOCATION - $10,000) 26 (DESIGN AND CONTINGENCIES - $40,000) 27 (53) POTTER COUNTY 28 (I) PA 449 29 (A) PA 449 FROM U.S.6 TO NEW YORK STATE 30 LINE, ALLEGANY, GENESEE AND ULYSSES 19990H1023B3629 - 176 -
1 TOWNSHIPS, RESTORATION 830,000 2 (BASE PROJECT ALLOCATION - $750,000) 3 (LAND ALLOCATION - $20,000) 4 (DESIGN AND CONTINGENCIES - $60,000) 5 (54) SCHUYLKILL COUNTY 6 (I) S.R.0061 7 (A) WIDEN AND SAFETY IMPROVEMENTS ON 8 S.R.0061 FROM DEER LAKE SOUTH 4,786,000 9 (BASE PROJECT ALLOCATION - $2,800,000) 10 (LAND ALLOCATION - $1,500,000) 11 (DESIGN AND CONTINGENCIES - $486,000) 12 (B) BERKS COUNTY LINE TO COLUMBIA COUNTY 13 LINE, VARIOUS MUNICIPALITIES, 14 RESTORATION, WIDENING AND SAFETY 15 IMPROVEMENTS 70,938,000 16 (BASE PROJECT ALLOCATION - $56,402,000) 17 (LAND ALLOCATION - $4,848,000) 18 (DESIGN AND CONTINGENCIES - $9,688,000) 19 (II) S.R.0081 20 (A) I-81 FROM LEBANON COUNTY LINE TO 21 LUZERNE COUNTY LINE, PAVEMENT 22 RESTORATION, BRIDGE REHABILITATION AND 23 SAFETY IMPROVEMENTS 4,350,000 24 (BASE PROJECT ALLOCATION - $4,300,000) 25 (DESIGN AND CONTINGENCIES - $50,000) 26 (B) FROM EXIT 32 TO EXIT 34, TREMONT AND 27 FRAILEY TOWNSHIPS, CONSTRUCT NORTHBOUND 28 CLIMBING LANE 810,000 29 (BASE PROJECT ALLOCATION - $800,000) 30 (DESIGN AND CONTINGENCIES - $10,000) 19990H1023B3629 - 177 -
1 (III) U.S.209 2 (A) FROM PA 901 TO PA 61, PINE GROVE, 3 WASHINGTON, WAYNE AND NORTH MANHEIM 4 TOWNSHIPS, SAFETY AND CONGESTION 5 IMPROVEMENTS 700,000 6 (BASE PROJECT ALLOCATION - $400,000) 7 (LAND ALLOCATION - $200,000) 8 (DESIGN AND CONTINGENCIES - $100,000) 9 (B) FROM PA 61 TO MIDDLEPORT BOROUGH LINE, 10 POTTSVILLE CITY, PORT CARBON AND PALO 11 ALTO BOROUGHS, NEW ROADWAY 2,500,000 12 (BASE PROJECT ALLOCATION - $1,800,000) 13 (LAND ALLOCATION - $300,000) 14 (DESIGN AND CONTINGENCIES - $400,000) 15 (C) INTERSECTION WITH S.R.0309, TAMAQUA 16 BOROUGH, INTERSECTION IMPROVEMENTS 1,460,000 17 (BASE PROJECT ALLOCATION - $1,200,000) 18 (LAND ALLOCATION - $160,000) 19 (DESIGN AND CONTINGENCIES - $100,000) 20 (D) S.R.0081 TO S.R.0125, TREMONT BOROUGH 21 AND TREMONT TOWNSHIP, WIDEN, DRAINAGE 22 AND RESURFACE 920,000 23 (BASE PROJECT ALLOCATION - $800,000) 24 (LAND ALLOCATION - $20,000) 25 (DESIGN AND CONTINGENCIES - $100,000) 26 (IV) PA 443 27 (A) FROM PA 125 TO PA 183, PINE GROVE, 28 WASHINGTON AND WAYNE TOWNSHIPS, 29 RESTORATION AND WIDENING 128,000 30 (BASE PROJECT ALLOCATION - $120,000) 19990H1023B3629 - 178 -
1 (DESIGN AND CONTINGENCIES - $8,000) 2 (B) INTERSECTION WITH PA 183, WAYNE 3 TOWNSHIP, INTERSECTION IMPROVEMENTS 164,000 4 (BASE PROJECT ALLOCATION - $160,000) 5 (DESIGN AND CONTINGENCIES - $4,000) 6 (V) PA 54 7 (A) FROM U.S.309 TO PA 61, RUSH TOWNSHIP, 8 RESTORATION AND WIDENING 1,430,000 9 (BASE PROJECT ALLOCATION - $1,120,000) 10 (LAND ALLOCATION - $10,000) 11 (DESIGN AND CONTINGENCIES - $300,000) 12 (B) T-873 TO T-853, MAHANOY CITY BOROUGH, 13 MILL AND RESURFACE 96,000 14 (BASE PROJECT ALLOCATION - $90,000) 15 (DESIGN AND CONTINGENCIES - $6,000) 16 (VI) S.R.3002 17 (A) FROM PA 183 TO PA 125, PINE GROVE, 18 WASHINGTON, WAYNE AND NORTH MANHEIM 19 TOWNSHIPS, RESTORATION AND WIDENING 310,000 20 (BASE PROJECT ALLOCATION - $240,000) 21 (LAND ALLOCATION - $10,000) 22 (DESIGN AND CONTINGENCIES - $60,000) 23 (VII) S.R.1008 24 (A) S.R.0061 TO EXIT 37 OF I-81, 25 FRACKVILLE BOROUGH, WEST MAHANOY AND 26 MAHANOY TOWNSHIPS, WIDEN TO 4 LANES, 27 DRAINAGE IMPROVEMENTS, RESURFACE 1,820,000 28 (BASE PROJECT ALLOCATION - $1,600,000) 29 (LAND ALLOCATION - $200,000) 30 (DESIGN AND CONTINGENCIES - $20,000) 19990H1023B3629 - 179 -
1 (VIII) S.R.0025 2 (A) INTERSECTION WITH S.R.0125, HEGINS 3 TOWNSHIP, INTERSECTION IMPROVEMENT 140,000 4 (BASE PROJECT ALLOCATION - $70,000) 5 (LAND ALLOCATION - $40,000) 6 (DESIGN AND CONTINGENCIES - $30,000) 7 (IX) S.R.4002 8 (A) S.R.0901 TO T-861, FOSTER AND CASS 9 TOWNSHIPS, STORM DRAINAGE IMPROVEMENTS 174,000 10 (BASE PROJECT ALLOCATION - $150,000) 11 (DESIGN AND CONTINGENCIES - $24,000) 12 (X) S.R.4013 13 (A) S.R.0025 TO S.R.4011, HEGINS AND 14 HUBLEY TOWNSHIPS, REALIGN, WIDEN AND 15 RESURFACE 296,000 16 (BASE PROJECT ALLOCATION - $240,000) 17 (LAND ALLOCATION - $16,000) 18 (DESIGN AND CONTINGENCIES - $40,000) 19 (XI) S.R.0025 20 (A) S.R.4013 TO S.R.0081, HEGINS AND 21 HUBLEY TOWNSHIPS, WIDEN AND RESURFACE 1,400,000 22 (BASE PROJECT ALLOCATION - $1,200,000) 23 (LAND ALLOCATION - $80,000) 24 (DESIGN AND CONTINGENCIES - $120,000) 25 (XII) S.R.4011 26 (A) S.R.4013 TO S.R.0209, HEGINS AND 27 TREMONT TOWNSHIPS, REALIGN, WIDEN AND 28 RESURFACE 920,000 29 (BASE PROJECT ALLOCATION - $800,000) 30 (LAND ALLOCATION - $40,000) 19990H1023B3629 - 180 -
1 (DESIGN AND CONTINGENCIES - $80,000) 2 (XIII) S.R.0924 3 (A) GILBERTON BOROUGH, ELIMINATION OF ROCK 4 FALL 890,000 5 (BASE PROJECT ALLOCATION - $800,000) 6 (LAND ALLOCATION - $40,000) 7 (DESIGN AND CONTINGENCIES - $50,000) 8 (XIV) S.R.4007 9 (A) S.R.4002 TO S.R.4006, CASS AND BUTLER 10 TOWNSHIPS, GORDON BOROUGH, WIDEN, 11 DRAINAGE, RESURFACE 796,000 12 (BASE PROJECT ALLOCATION - $720,000) 13 (LAND ALLOCATION - $6,000) 14 (DESIGN AND CONTINGENCIES - $70,000) 15 (XV) S.R.1006 16 (A) ST. CLAIR BOROUGH TO S.R.1008, RYAN, 17 BLYTHE AND EAST NORWEGIAN TOWNSHIPS, 18 WIDENING, SHOULDER IMPROVEMENTS AND 19 RESURFACING 460,000 20 (BASE PROJECT ALLOCATION - $400,000) 21 (LAND ALLOCATION - $20,000) 22 (DESIGN AND CONTINGENCIES - $40,000) 23 (XVI) S.R.0901 24 (A) S.R.0081 TO S.R.4002, FOSTER AND CASS 25 TOWNSHIPS AND MINERSVILLE BOROUGH, 26 WIDEN, CONSTRUCT CLIMBING LANE, 27 DRAINAGE AND RESURFACE 1,020,000 28 (BASE PROJECT ALLOCATION - $800,000) 29 (LAND ALLOCATION - $60,000) 30 (DESIGN AND CONTINGENCIES - $160,000) 19990H1023B3629 - 181 -
1 (XVII) S.R.0000 2 (A) FROM PINE CREEK TO ORCHARD ROAD, RUSH 3 TOWNSHIP, STABILIZE STREAM EMBANKMENT 408,000 4 (BASE PROJECT ALLOCATION - $8,000) 5 (DESIGN AND CONTINGENCIES - $400,000) 6 (XVIII) S.R.0000 7 (A) FROM BERKS COUNTY LINE TO I-81 VARIOUS 8 MUNICIPALITIES, NEW ROADWAY 92,000,000 9 (BASE PROJECT ALLOCATION - $80,000,000) 10 (LAND ALLOCATION - $10,000,000) 11 (DESIGN AND CONTINGENCIES - $2,000,000) 12 (55) SOMERSET COUNTY 13 (I) S.R.0219 14 (A) RESURFACE S.R.0219 FROM S.R.0281 15 INTERCHANGE TO END OF EXPRESSWAY, 16 SOMERSET TOWNSHIP 5,480,000 17 (BASE PROJECT ALLOCATION - $5,280,000) 18 (DESIGN AND CONTINGENCIES - $200,000) 19 (B) U.S.219 FROM SOMERSET TO CAMBRIA 20 COUNTY LINE, PAVEMENT RESTORATION, 21 BRIDGE REHABILITATION AND SAFETY 22 IMPROVEMENTS 2,450,000 23 (BASE PROJECT ALLOCATION - $2,400,000) 24 (DESIGN AND CONTINGENCIES - $50,000) 25 (II) PA 601 26 (A) NORTH CENTER AVENUE, SOMERSET 27 TOWNSHIP, TRAFFIC SIGNALS, SAFETY 28 IMPROVEMENT/TURN LANE 90,000 29 (BASE PROJECT ALLOCATION - $83,000) 30 (LAND ALLOCATION - $1,000) 19990H1023B3629 - 182 -
1 (DESIGN AND CONTINGENCIES - $6,000) 2 (III) PA 31 3 (A) INTERSECTION OF PA 31 AND PLEASANT 4 HILL ROAD (T-546), SOMERSET TOWNSHIP, 5 SAFETY IMPROVEMENT 79,000 6 (BASE PROJECT ALLOCATION - $50,000) 7 (LAND ALLOCATION - $15,000) 8 (DESIGN AND CONTINGENCIES - $14,000) 9 (IV) PA 281 10 (A) INTERSECTION OF PA 281 AND SECHLER 11 ROAD, SOMERSET BOROUGH, SAFETY 12 IMPROVEMENT 79,000 13 (BASE PROJECT ALLOCATION - $50,000) 14 (LAND ALLOCATION - $15,000) 15 (DESIGN AND CONTINGENCIES - $14,000) 16 (B) INTERSECTION OF PA 281 AND SECHLER 17 ROAD, SOMERSET BOROUGH, SAFETY 18 IMPROVEMENT 24,000 19 (BASE PROJECT ALLOCATION - $20,000) 20 (LAND ALLOCATION - $1,000) 21 (DESIGN AND CONTINGENCIES - $3,000) 22 (V) S.R.3041 23 (A) INTERSECTION OF S.R.3041 AND 24 INDUSTRIAL PARK ROAD (T-522), SOMERSET 25 TOWNSHIP, SAFETY IMPROVEMENT 105,000 26 (BASE PROJECT ALLOCATION - $70,000) 27 (LAND ALLOCATION - $20,000) 28 (DESIGN AND CONTINGENCIES - $15,000) 29 (VI) PA 160 30 (A) WELLERSBURG, SOUTHAMPTON TOWNSHIP, 19990H1023B3629 - 183 -
1 CONSTRUCT TRUCK RAMP 780,000 2 (BASE PROJECT ALLOCATION - $400,000) 3 (LAND ALLOCATION - $80,000) 4 (DESIGN AND CONTINGENCIES - $300,000) 5 (56) SULLIVAN COUNTY 6 (I) U.S.220 7 (A) U.S.220 FROM CHRISTIAN STREET TO 8 RAILROAD STREET, RESURFACE 174,000 9 (BASE PROJECT ALLOCATION - $94,000) 10 (LAND ALLOCATION - $10,000) 11 (DESIGN AND CONTINGENCIES - $70,000) 12 (II) PA 87 13 (A) PA 87 OVER STONEY RUN, HILLSGROVE 14 TOWNSHIP, BRIDGE REPLACEMENT 86,000 15 (BASE PROJECT ALLOCATION - $60,000) 16 (LAND ALLOCATION - $6,000) 17 (DESIGN AND CONTINGENCIES - $20,000) 18 (57) SUSQUEHANNA COUNTY 19 (I) S.R.0081 20 (A) I-81 FROM LENOX TO HARFORD, TOWNSHIPS, 21 RESURFACE 2,150,000 22 (BASE PROJECT ALLOCATION - $2,100,000) 23 (DESIGN AND CONTINGENCIES - $50,000) 24 (B) I-81 FROM HARFORD TOWNSHIP TO NEW 25 MILFORD BOROUGH, RESURFACE 300,000 26 (BASE PROJECT ALLOCATION - $290,000) 27 (DESIGN AND CONTINGENCIES - $10,000) 28 (C) I-81, LACKAWANNA COUNTY TO NEW YORK 29 STATE LINE, OVERHEAD SIGN STRUCTURES 35,000 30 (BASE PROJECT ALLOCATION - $35,000) 19990H1023B3629 - 184 -
1 (II) S.R.0706 2 (A) BRADFORD TO U.S.11, STUDY AND 3 RECONSTRUCTION 3,200,000 4 (BASE PROJECT ALLOCATION - $2,000,000) 5 (LAND ALLOCATION - $200,000) 6 (DESIGN AND CONTINGENCIES - $1,000,000) 7 (58) TIOGA COUNTY 8 (I) S.R.0015 9 (A) U.S.15 FROM LYCOMING COUNTY LINE TO 10 S.R.2005, PAVEMENT RESTORATION, BRIDGE 11 REHABILITATION AND SAFETY IMPROVEMENTS 650,000 12 (BASE PROJECT ALLOCATION - $600,000) 13 (DESIGN AND CONTINGENCIES - $50,000) 14 (B) U.S.15 FROM CANOE CAMP TO PA 287, 15 PAVEMENT RESTORATION, BRIDGE 16 REHABILITATION AND SAFETY IMPROVEMENTS 1,150,000 17 (BASE PROJECT ALLOCATION - $1,100,000) 18 (DESIGN AND CONTINGENCIES - $50,000) 19 (II) PA 49 20 (A) PA 49 FROM T-763 TO LAWRENCEVILLE 21 BOROUGH, RESTORATION 426,000 22 (BASE PROJECT ALLOCATION - $406,000) 23 (DESIGN AND CONTINGENCIES - $20,000) 24 (59) UNION COUNTY 25 (I) S.R.0080 26 (A) I-80 FROM NORTHUMBERLAND COUNTY LINE 27 TO CLINTON COUNTY LINE, PAVEMENT 28 RESTORATION, BRIDGE REHABILITATION AND 29 SAFETY IMPROVEMENTS 1,650,000 30 (BASE PROJECT ALLOCATION - $1,600,000) 19990H1023B3629 - 185 -
1 (DESIGN AND CONTINGENCIES - $50,000) 2 (II) S.R.0015 3 (A) U.S.15 FROM LINNTOWN TO ALLENWOOD, 4 PAVEMENT RESTORATION, BRIDGE 5 REHABILITATION AND SAFETY IMPROVEMENTS 1,050,000 6 (BASE PROJECT ALLOCATION - $1,000,000) 7 (DESIGN AND CONTINGENCIES - $50,000) 8 (B) LYCOMING/UNION COUNTY LINE TO PA 44, 9 ALLENWOOD, RECONSTRUCTION, SAFETY 10 IMPROVEMENTS 6,000,000 11 (BASE PROJECT ALLOCATION - $5,000,000) 12 (LAND ALLOCATION - $500,000) 13 (DESIGN AND CONTINGENCIES - $500,000) 14 (C) EAST BUFFALO/UNION TOWNSHIP LINE TO 15 SOUTH OF THE VILLAGE OF WINFIELD, 16 SANDEL ROAD T-333 2,700,000 17 (BASE PROJECT ALLOCATION - $2,500,000) 18 (LAND ALLOCATION - $100,000) 19 (DESIGN AND CONTINGENCIES - $100,000) 20 (III) S.R.0045 21 (A) LEWISBURG S.R.0015 TO MIFFLINBURG 22 S.R.3007 CORRIDOR STUDY, SAFETY 23 IMPROVEMENTS 5,300,000 24 (BASE PROJECT ALLOCATION - $5,000,000) 25 (LAND ALLOCATION - $100,000) 26 (DESIGN AND CONTINGENCIES - $200,000) 27 (60) VENANGO COUNTY 28 (I) S.R.0322 29 (A) U.S.322 FROM HORSE CREEK ROAD TO 30 MAPLESHADE, CRANBERRY TOWNSHIP, 19990H1023B3629 - 186 -
1 RECONSTRUCTION 463,000 2 (BASE PROJECT ALLOCATION - $403,000) 3 (LAND ALLOCATION - $20,000) 4 (DESIGN AND CONTINGENCIES - $40,000) 5 (B) IMPROVEMENTS AT INTERSECTION OF 6 U.S.322, PA 357 AND S.R.2013 261,000 7 (BASE PROJECT ALLOCATION - $201,000) 8 (DESIGN AND CONTINGENCIES - $60,000) 9 (II) S.R.0008 10 (A) S.R.0008 FROM WESLEY S.R.3003 TO 11 S.R.3013, PAVEMENT RESTORATION, BRIDGE 12 REHABILITATION AND SAFETY IMPROVEMENTS 1,150,000 13 (BASE PROJECT ALLOCATION - $1,100,000) 14 (DESIGN AND CONTINGENCIES - $50,000) 15 (III) S.R.0080 16 (A) I-80 FROM CLARION COUNTY LINE TO 17 MERCER COUNTY LINE, PAVEMENT 18 RESTORATION, BRIDGE REHABILITATION AND 19 SAFETY IMPROVEMENTS 1,550,000 20 (BASE PROJECT ALLOCATION - $1,500,000) 21 (DESIGN AND CONTINGENCIES - $50,000) 22 (IV) PA 38 23 (A) PA 38, TOP OF EMLENTON HILL, 24 SCRUBGRASS TOWNSHIP, TRUCK PULL-OFF 25 LANE 1,000,000 26 (BASE PROJECT ALLOCATION - $800,000) 27 (LAND ALLOCATION - $100,000) 28 (DESIGN AND CONTINGENCIES - $100,000) 29 (V) PA 417 30 (A) INTERSECTION OF SUGARCREEK BOROUGH 19990H1023B3629 - 187 -
1 ROAD AND OLD WARREN ROAD, SUGARCREEK 2 BOROUGH, SAFETY IMPROVEMENT 250,000 3 (BASE PROJECT ALLOCATION - $200,000) 4 (LAND ALLOCATION - $10,000) 5 (DESIGN AND CONTINGENCIES - $40,000) 6 (61) WARREN COUNTY 7 (I) S.R.6006 8 (A) IMPROVEMENT TO INTERSECTION AT T.R. 6B 9 AND S.R.1013 100,000 10 (BASE PROJECT ALLOCATION - $70,000) 11 (LAND ALLOCATION - $20,000) 12 (DESIGN AND CONTINGENCIES - $10,000) 13 (II) S.R.0006 14 (A) U.S.6 FROM SOUTH WARREN S.R.2003 TO 15 U.S.6 BUSINESS, PAVEMENT RESTORATION, 16 BRIDGE REHABILITATION AND SAFETY 17 IMPROVEMENTS 250,000 18 (BASE PROJECT ALLOCATION - $200,000) 19 (DESIGN AND CONTINGENCIES - $50,000) 20 (III) S.R.0069 21 (A) WIDEN AND RESURFACE S.R.0069 FROM 22 S.R.0062 TO NEW YORK STATE LINE 6,000,000 23 (BASE PROJECT ALLOCATION - $5,250,000) 24 (DESIGN AND CONTINGENCIES - $750,000) 25 (IV) PENNSYLVANIA AVENUE 26 (A) INTERSECTION OF PENNSYLVANIA AVENUE 27 AND PARK AVENUE, INTERSECTION 28 IMPROVEMENT 100,000 29 (BASE PROJECT ALLOCATION - $70,000) 30 (LAND ALLOCATION - $20,000) 19990H1023B3629 - 188 -
1 (DESIGN AND CONTINGENCIES - $10,000) 2 (62) WASHINGTON COUNTY 3 (I) S.R.0019 4 (A) IMPROVE INTERCHANGE WITH S.R.1010, 5 VALLEY BROOK ROAD 500,000 6 (B) IMPROVE INTERSECTION AND APPROACHES TO 7 S.R.1002 1,500,000 8 (C) U.S.19 AT MEADOWBROOK DRIVE, NORTH 9 STRABANE TOWNSHIP, SAFETY 10 IMPROVEMENT/TURNING LANE 181,000 11 (BASE PROJECT ALLOCATION - $147,000) 12 (LAND ALLOCATION - $12,000) 13 (DESIGN AND CONTINGENCIES - $22,000) 14 (D) U.S.19, GATESHEAD TO HIDDEN VALLEY 15 ROAD, RESTORATION 102,000 16 (BASE PROJECT ALLOCATION - $68,000) 17 (LAND ALLOCATION - $24,000) 18 (DESIGN AND CONTINGENCIES - $10,000) 19 (II) S.R.0070 20 (A) IMPROVE INTERCHANGE RAMPS ON WESTERN 21 SIDE OF S.R.2037, FALLOWFIELD TOWNSHIP 1,000,000 22 (BASE PROJECT ALLOCATION - $800,000) 23 (LAND ALLOCATION - $100,000) 24 (DESIGN AND CONTINGENCIES - $100,000) 25 (B) IMPROVE AIRPORT INTERCHANGE FROM 26 BUFFALO TOWNSHIP TO S.R.0040 2,600,000 27 (BASE PROJECT ALLOCATION - $2,000,000) 28 (LAND ALLOCATION - $300,000) 29 (DESIGN AND CONTINGENCIES - $300,000) 30 (C) I-70 FROM WESTMORELAND COUNTY LINE TO 19990H1023B3629 - 189 -
1 WEST VIRGINIA STATE LINE, PAVEMENT 2 RESTORATION, BRIDGE REHABILITATION AND 3 SAFETY IMPROVEMENTS 4,150,000 4 (BASE PROJECT ALLOCATION - $4,100,000) 5 (DESIGN AND CONTINGENCIES - $50,000) 6 (D) I-70/PA 88 INTERSECTION, CHARLEROI 7 BOROUGH, SAFETY IMPROVEMENT 540,000 8 (BASE PROJECT ALLOCATION - $400,000) 9 (LAND ALLOCATION - $100,000) 10 (DESIGN AND CONTINGENCIES - $40,000) 11 (E) I-70, EXIT 3 TO EXIT 4, RESTORATION 800,000 12 (BASE PROJECT ALLOCATION - $760,000) 13 (DESIGN AND CONTINGENCIES - $40,000) 14 (F) I-70, LOWER INTERCHANGE RAMPS, WEST 15 SIDE OF S.R.2037, FALLOWFIELD TOWNSHIP, 16 RECONSTRUCTION 600,000 17 (BASE PROJECT ALLOCATION - $400,000) 18 (LAND ALLOCATION - $100,000) 19 (DESIGN AND CONTINGENCIES - $100,000) 20 (III) S.R.0079 21 (A) I-79 FROM GREENE COUNTY LINE TO 22 ALLEGHENY COUNTY LINE, PAVEMENT 23 RESTORATION, BRIDGE REHABILITATION AND 24 SAFETY IMPROVEMENTS 2,450,000 25 (BASE PROJECT ALLOCATION - $2,400,000) 26 (DESIGN AND CONTINGENCIES - $50,000) 27 (IV) S.R.0088 28 (A) IMPROVE TURNING RADIUS AT INTERSECTION 29 WITH S.R.1006, FINLEYVILLE 360,000 30 (BASE PROJECT ALLOCATION - $60,000) 19990H1023B3629 - 190 -
1 (LAND ALLOCATION - $200,000) 2 (DESIGN AND CONTINGENCIES - $100,000) 3 (B) INTERSECTION OF PA 88 AND PA 837, NEW 4 EAGLE BOROUGH, SAFETY IMPROVEMENT 120,000 5 (BASE PROJECT ALLOCATION - $100,000) 6 (LAND ALLOCATION - $10,000) 7 (DESIGN AND CONTINGENCIES - $10,000) 8 (C) PA 88, FROM PA 481 TO PA 136, CITY OF 9 MONONGAHELA, SAFETY IMPROVEMENTS 56,000 10 (BASE PROJECT ALLOCATION - $40,000) 11 (LAND ALLOCATION - $6,000) 12 (DESIGN AND CONTINGENCIES - $10,000) 13 (V) S.R.4049, S.R.1083 AND S.R.0018 14 (A) MAIN STREET FROM WALNUT STREET TO 15 RAILROAD TRACKS AND MAIDEN STREET FROM 16 FRANKLIN STREET TO COLLEGE STREET, 17 RECONSTRUCTION 760,000 18 (BASE PROJECT ALLOCATION - $760,000) 19 (VI) PA 18 20 (A) PA 18/MARKET STREET INTERSECTION, 21 BURGETTSTOWN, INTERSECTION IMPROVEMENT 140,000 22 (BASE PROJECT ALLOCATION - $30,000) 23 (LAND ALLOCATION - $50,000) 24 (DESIGN AND CONTINGENCIES - $60,000) 25 (B) INTERSECTION OF PA 18 AND S.R.4008, 26 BURGETTSTOWN BOROUGH, SAFETY 27 IMPROVEMENT 140,000 28 (BASE PROJECT ALLOCATION - $60,000) 29 (LAND ALLOCATION - $50,000) 30 (DESIGN AND CONTINGENCIES - $30,000) 19990H1023B3629 - 191 -
1 (VII) PA 519 2 (A) INTERSECTIONS WITH PA 980 AND U.S.19 3 SOUTHBOUND RAMPS, NORTH STRABANE 4 TOWNSHIP, SIGNAL IMPROVEMENTS 80,000 5 (BASE PROJECT ALLOCATION - $40,000) 6 (LAND ALLOCATION - $20,000) 7 (DESIGN AND CONTINGENCIES - $20,000) 8 (VIII) S.R.1006 9 (A) INTERSECTION OF S.R.1006 AND S.R.1053, 10 SAFETY IMPROVEMENT 100,000 11 (BASE PROJECT ALLOCATION - $70,000) 12 (LAND ALLOCATION - $20,000) 13 (DESIGN AND CONTINGENCIES - $10,000) 14 (IX) S.R.1010 15 (A) BEBOUT ROAD INTERSECTION, PETERS 16 TOWNSHIP, SAFETY IMPROVEMENT/TURNING 17 LANE 98,000 18 (BASE PROJECT ALLOCATION - $88,000) 19 (DESIGN AND CONTINGENCIES - $10,000) 20 (X) S.R.4049 21 (A) INTERSECTION TO HUMBERT LANE/COLONIAL 22 DRIVE, SAFETY IMPROVEMENT 170,000 23 (BASE PROJECT ALLOCATION - $120,000) 24 (LAND ALLOCATION - $30,000) 25 (DESIGN AND CONTINGENCIES - $20,000) 26 (XI) COUNTYWIDE 27 (A) COUNTYWIDE, TRAFFIC SIGNAL 28 IMPROVEMENTS 320,000 29 (BASE PROJECT ALLOCATION - $260,000) 30 (LAND ALLOCATION - $20,000) 19990H1023B3629 - 192 -
1 (DESIGN AND CONTINGENCIES - $40,000) 2 (63) WAYNE COUNTY 3 (I) S.R.0084 4 (A) I-84 FROM PIKE COUNTY LINE TO 5 LACKAWANNA COUNTY LINE, PAVEMENT 6 RESTORATION, BRIDGE REHABILITATION AND 7 SAFETY IMPROVEMENTS 650,000 8 (BASE PROJECT ALLOCATION - $600,000) 9 (DESIGN AND CONTINGENCIES - $50,000) 10 (II) S.R.0380 11 (A) I-380 FROM NEW JERSEY STATE LINE TO 12 LACKAWANNA COUNTY LINE, PAVEMENT 13 RESTORATION, BRIDGE REHABILITATION AND 14 SAFETY IMPROVEMENTS 150,000 15 (BASE PROJECT ALLOCATION - $100,000) 16 (DESIGN AND CONTINGENCIES - $50,000) 17 (III) PA 296 18 (A) PRISON ACCESS, WAYMART, ROADWAY 19 IMPROVEMENTS 440,000 20 (BASE PROJECT ALLOCATION - $400,000) 21 (LAND ALLOCATION - $20,000) 22 (DESIGN AND CONTINGENCIES - $20,000) 23 (64) WESTMORELAND COUNTY 24 (I) S.R.0056 25 (A) IMPROVEMENTS FROM S.R.4048 TO 26 INTERSECTION WITH T-792 130,000 27 (BASE PROJECT ALLOCATION - $80,000) 28 (LAND ALLOCATION - $10,000) 29 (DESIGN AND CONTINGENCIES - $40,000) 30 (II) S.R.0119 19990H1023B3629 - 193 -
1 (A) INTERMODAL INTERCHANGE ACCESS, EAST 2 HUNTINGTON TOWNSHIP 2,400,000 3 (BASE PROJECT ALLOCATION - $2,000,000) 4 (LAND ALLOCATION - $200,000) 5 (DESIGN AND CONTINGENCIES - $200,000) 6 (B) U.S.119, TURNPIKE BRIDGE TO YOUNGWOOD, 7 RESTORATION 520,000 8 (BASE PROJECT ALLOCATION - $400,000) 9 (LAND ALLOCATION - $40,000) 10 (DESIGN AND CONTINGENCIES - $80,000) 11 (III) S.R.0130 12 (A) INTERSECTION IMPROVEMENTS FROM 13 S.R.4002 TO TOLL 66, HEMPFIELD 14 TOWNSHIP 260,000 15 (BASE PROJECT ALLOCATION - $200,000) 16 (LAND ALLOCATION - $20,000) 17 (DESIGN AND CONTINGENCIES - $40,000) 18 (B) INTERSECTION OF PA 130 AND S.R.2013, 19 SLATE RUN ROAD, HEMPFIELD TOWNSHIP, 20 SAFETY IMPROVEMENT 20,000 21 (BASE PROJECT ALLOCATION - $16,000) 22 (LAND ALLOCATION - $2,000) 23 (DESIGN AND CONTINGENCIES - $2,000) 24 (C) INTERSECTION OF PA 130 AND PLEASANT 25 VALLEY ROAD, PENN TOWNSHIP, SAFETY 26 IMPROVEMENT AND ADD LANE 122,000 27 (BASE PROJECT ALLOCATION - $57,000) 28 (LAND ALLOCATION - $25,000) 29 (DESIGN AND CONTINGENCIES - $40,000) 30 (IV) S.R.0819 19990H1023B3629 - 194 -
1 (A) IMPROVEMENTS FROM T-744 TO T-395, EAST 2 HUNTINGDON TOWNSHIP 3,900,000 3 (V) S.R.3020 4 (A) RELOCATION OF S.R.3020, IMPROVEMENTS 5 TO S.R.30, AND A NEW INTERSECTION WITH 6 S.R.3020 AND S.R.30, NORTH HUNTINGDON 7 TOWNSHIP 9,400,000 8 (VI) S.R.0070 9 (A) I-70 FROM I-76 TO WASHINGTON COUNTY 10 LINE, PAVEMENT RESTORATION, BRIDGE 11 REHABILITATION AND SAFETY IMPROVEMENTS 1,750,000 12 (BASE PROJECT ALLOCATION - $1,700,000) 13 (DESIGN AND CONTINGENCIES - $50,000) 14 (B) I-70, NEAR WASHINGTON COUNTY LINE, 15 RESTORATION 420,000 16 (BASE PROJECT ALLOCATION - $400,000) 17 (DESIGN AND CONTINGENCIES - $20,000) 18 (C) I-70, NEW STANTON INTERCHANGE, NEW 19 STANTON BOROUGH, RECONSTRUCTION 3,300,000 20 (BASE PROJECT ALLOCATION - $3,000,000) 21 (LAND ALLOCATION - $200,000) 22 (DESIGN AND CONTINGENCIES - $100,000) 23 (VII) S.R.0422 24 (A) U.S.422, GREENSBURG BYPASS, PAVEMENT 25 RESTORATION, BRIDGE REHABILITATION AND 26 SAFETY IMPROVEMENTS 450,000 27 (BASE PROJECT ALLOCATION - $400,000) 28 (DESIGN AND CONTINGENCIES - $50,000) 29 (VIII) S.R.0030 30 (A) WIDEN S.R.0030 FROM COLONY LANE TO 19990H1023B3629 - 195 -
1 THOMPSON LANE, IMPROVE INTERSECTION 2 WITH S.R.3020 AND RELOCATE S.R.3020, 3 NORTH HUNTINGDON TOWNSHIP 13,700,000 4 (BASE PROJECT ALLOCATION - $9,800,000) 5 (LAND ALLOCATION - $2,000,000) 6 (DESIGN AND CONTINGENCIES - $1,900,000) 7 (B) U.S.30, FROM S.R.4019 TO MALTS LANE, 8 SAFETY IMPROVEMENT AND ADD LANE 650,000 9 (BASE PROJECT ALLOCATION - $500,000) 10 (LAND ALLOCATION - $100,000) 11 (DESIGN AND CONTINGENCIES - $50,000) 12 (C) U.S.30, ALLEGHENY COUNTY LINE TO 13 S.R.4019, SAFETY IMPROVEMENT AND ADD 14 LANE 560,000 15 (BASE PROJECT ALLOCATION - $400,000) 16 (LAND ALLOCATION - $100,000) 17 (DESIGN AND CONTINGENCIES - $60,000) 18 (D) U.S.30, INTERSECTION OF U.S.30 AND PA 19 981, UNITY TOWNSHIP, RECONSTRUCTION AND 20 INTERSECTION IMPROVEMENT 960,000 21 (BASE PROJECT ALLOCATION - $600,000) 22 (LAND ALLOCATION - $200,000) 23 (DESIGN AND CONTINGENCIES - $160,000) 24 (E) U.S.30, IRWIN BRIDGE TO HAMILTON 25 BUICK, SAFETY IMPROVEMENT AND ADD LANE 390,000 26 (BASE PROJECT ALLOCATION - $300,000) 27 (LAND ALLOCATION - $60,000) 28 (DESIGN AND CONTINGENCIES - $30,000) 29 (IX) PA 31 30 (A) INTERSECTION OF PA 31 AT PA 981 AND 19990H1023B3629 - 196 -
1 BRADDOCK AVENUE, MT. PLEASANT BOROUGH, 2 SIGNAL IMPROVEMENTS AND ADD LANE 440,000 3 (BASE PROJECT ALLOCATION - $400,000) 4 (LAND ALLOCATION - $20,000) 5 (DESIGN AND CONTINGENCIES - $20,000) 6 (B) INTERSECTION OF PA 31 AND PENNSYLVANIA 7 TURNPIKE EXIT 9 DONEGAL, DONEGAL 8 TOWNSHIP, SIGNAL IMPROVEMENTS AND 9 TURNING LANES 107,000 10 (BASE PROJECT ALLOCATION - $57,000) 11 (LAND ALLOCATION - $10,000) 12 (DESIGN AND CONTINGENCIES - $40,000) 13 (X) PA 66 14 (A) INTERSECTION OF PA 66 AND BEAVER RUN 15 ROAD, WASHINGTON TOWNSHIP, SAFETY 16 IMPROVEMENT AND ADD LANE 230,000 17 (BASE PROJECT ALLOCATION - $200,000) 18 (LAND ALLOCATION - $20,000) 19 (DESIGN AND CONTINGENCIES - $10,000) 20 (XI) PA 136 21 (A) INTERSECTION OF PA 136 AND U.S.30, 22 GREENSBURG, SAFETY IMPROVEMENT 130,000 23 (BASE PROJECT ALLOCATION - $100,000) 24 (LAND ALLOCATION - $10,000) 25 (DESIGN AND CONTINGENCIES - $20,000) 26 (B) SAFETY IMPROVEMENTS AND INTERSECTION 27 UPGRADES FROM S.R.0030 TO S.R.3071, 28 HEMPFIELD TOWNSHIP 5,000,000 29 (XII) PA 981 30 (A) INTERSECTION OF PA 981 AND MONASTERY 19990H1023B3629 - 197 -
1 DRIVE, SIGNAL IMPROVEMENTS AND ADD 2 LANE 136,000 3 (BASE PROJECT ALLOCATION - $120,000) 4 (LAND ALLOCATION - $2,000) 5 (DESIGN AND CONTINGENCIES - $14,000) 6 (XIII) S.R.1045 7 (A) ST. VINCENT COLLEGE, RELOCATION 720,000 8 (BASE PROJECT ALLOCATION - $600,000) 9 (DESIGN AND CONTINGENCIES - $120,000) 10 (XIV) COUNTYWIDE 11 (A) COUNTYWIDE, TRAFFIC SIGNAL 12 IMPROVEMENT 530,000 13 (BASE PROJECT ALLOCATION - $480,000) 14 (LAND ALLOCATION - $20,000) 15 (DESIGN AND CONTINGENCIES - $30,000) 16 (XV) BREWERY STREET, CITY OF GREENSBURG 17 (A) REPLACEMENT OF THE BREWERY STREET 18 BRIDGE 925,000 19 (BASE PROJECT ALLOCATION - $650,000) 20 (LAND ALLOCATION - $25,000) 21 (DESIGN AND CONTINGENCIES - $250,000) 22 (XVI) LAIRD STREET, CITY OF GREENSBURG 23 (A) REPLACEMENT OF THE LAIRD STREET 24 BRIDGE 725,000 25 (BASE PROJECT ALLOCATION - $500,000) 26 (LAND ALLOCATION - $25,000) 27 (DESIGN AND CONTINGENCIES - $200,000) 28 (XVII) ST. VINCENT GROVE ROAD, UNITY TOWNSHIP 29 (A) REPLACEMENT OF THE ST. VINCENT GROVE 30 ROAD BRIDGE 1,590,000 19990H1023B3629 - 198 -
1 (BASE PROJECT ALLOCATION - $1,200,000) 2 (LAND ALLOCATION - $40,000) 3 (DESIGN AND CONTINGENCIES - $350,000) 4 (XVIII) T.R.0937, DERRY TOWNSHIP 5 (A) REPLACEMENT OF THE T.R.0937 BRIDGE 6 BETWEEN S.R.1025 AND S.R.1027 725,000 7 (BASE PROJECT ALLOCATION - $500,000) 8 (LAND ALLOCATION - $25,000) 9 (DESIGN AND CONTINGENCIES - $200,000) 10 (XIX) T.R.0941, DERRY TOWNSHIP 11 (A) REPLACEMENT OF THE T.R.0941 BRIDGE 12 BETWEEN T.R.0968 AND S.R.1027 725,000 13 (BASE PROJECT ALLOCATION - $500,000) 14 (LAND ALLOCATION - $25,000) 15 (DESIGN AND CONTINGENCIES - $200,000) 16 (65) WYOMING COUNTY 17 (I) U.S.6 18 (A) REHABILITATION AND SAFETY IMPROVEMENTS 19 FROM PA 87 TO T-455 1,150,000 20 (B) REHABILITATION AND SAFETY IMPROVEMENTS 21 FROM T-455 TO TUNKHANNOCK BYPASS 2,200,000 22 (C) FROM PA 92 TO EXISTING CONCRETE 23 SECTION, TUNKHANNOCK TOWNSHIP, 24 RESURFACING 8,000 25 (BASE PROJECT ALLOCATION - $8,000) 26 (II) U.S.11 27 (A) REHABILITATION AND SAFETY IMPROVEMENTS 28 FROM THE SUSQUEHANNA COUNTY LINE TO 29 U.S.6 2,500,000 30 (III) S.R.1003 19990H1023B3629 - 199 -
1 (A) FROM S.R.1005 TO PA 29, LEMON AND 2 TUNKHANNOCK TOWNSHIPS, RESURFACING 8,000 3 (BASE PROJECT ALLOCATION - $8,000) 4 (IV) S.R.1005 5 (A) FROM C.P. MASON ROAD TO S.R.1003, 6 LEMON TOWNSHIP, RESURFACING 16,000 7 (BASE PROJECT ALLOCATION - $16,000) 8 (V) S.R.1007 9 (A) FROM S.R.1005 TO PA 29, LEMON 10 TOWNSHIP, RESURFACING 4,000 11 (BASE PROJECT ALLOCATION - $4,000) 12 (VI) PA 92 13 (A) FROM THE FALLS BRIDGE TO VILLAGE OF 14 OSTERHOUT, FALLS TOWNSHIP, RESURFACING 70,000 15 (BASE PROJECT ALLOCATION - $70,000) 16 (B) FROM S.R.1009 TO S.R.1011, LEMON 17 TOWNSHIP, RESURFACING 28,000 18 (BASE PROJECT ALLOCATION - $28,000) 19 (C) FROM OSTERHOUT TO DEPARTMENT OF 20 AGRICULTURE BUILDING, TUNKHANNOCK 21 TOWNSHIP, RESURFACING 38,000 22 (BASE PROJECT ALLOCATION - $38,000) 23 (VII) PA 87 24 (A) FROM PROCTOR AND GAMBLE DRIVE TO 25 U.S.6, WASHINGTON TOWNSHIP, 26 RESURFACING 28,000 27 (BASE PROJECT ALLOCATION - $28,000) 28 (VIII) PA 309 29 (A) FROM LUZERNE COUNTY TO T-352, ROADWAY 30 IMPROVEMENTS 290,000 19990H1023B3629 - 200 -
1 (BASE PROJECT ALLOCATION - $200,000) 2 (LAND ALLOCATION - $40,000) 3 (DESIGN AND CONTINGENCIES - $50,000) 4 (B) S.R.2007 TO RIVER BRIDGE, EATON 5 TOWNSHIP, RESTORATION 510,000 6 (BASE PROJECT ALLOCATION - $400,000) 7 (LAND ALLOCATION - $50,000) 8 (DESIGN AND CONTINGENCIES - $60,000) 9 (66) YORK COUNTY 10 (I) S.R.0030 11 (A) PREVENTIVE MAINTENANCE ON S.R.0030 12 BETWEEN S.R.0024 AND HALLAM 13 INTERCHANGE 610,000 14 (BASE PROJECT ALLOCATION - $500,000) 15 (LAND ALLOCATION - $10,000) 16 (DESIGN AND CONTINGENCIES - $100,000) 17 (B) U.S.30 FROM LANCASTER COUNTY LINE TO 18 PA 462 JUNCTION, PAVEMENT RESTORATION, 19 BRIDGE REHABILITATION AND SAFETY 20 IMPROVEMENTS 1,850,000 21 (BASE PROJECT ALLOCATION - $1,800,000) 22 (DESIGN AND CONTINGENCIES - $50,000) 23 (II) S.R.0074 24 (A) RECONSTRUCTION AND HIGHWAY SAFETY 25 IMPROVEMENTS 3,000,000 26 (BASE PROJECT ALLOCATION - $1,000,000) 27 (LAND ALLOCATION - $500,000) 28 (DESIGN AND CONTINGENCIES - $1,500,000) 29 (B) INTERSECTION IMPROVEMENTS WITH PARK 30 STREET, PLEASANT STREET AND WALNUT 19990H1023B3629 - 201 -
1 STREET, DALLASTOWN BOROUGH 205,000 2 (BASE PROJECT ALLOCATION - $30,000) 3 (LAND ALLOCATION - $25,000) 4 (DESIGN AND CONTINGENCIES - $150,000) 5 (III) S.R.0083 6 (A) RECONSTRUCTION OF S.R.0083 FROM EXIT 4 7 TO EXIT 5 10,017,000 8 (BASE PROJECT ALLOCATION - $7,600,000) 9 (LAND ALLOCATION - $600,000) 10 (DESIGN AND CONTINGENCIES - $1,817,000) 11 (B) IMPROVEMENTS TO S.R.0083 FROM EXIT 6 12 TO EXIT 8 1,220,000 13 (BASE PROJECT ALLOCATION - $1,120,000) 14 (DESIGN AND CONTINGENCIES - $100,000) 15 (C) SAFETY IMPROVEMENTS OF EXITS 1, 2 AND 16 3 BY LENGTHENING THE RAMPS 910,000 17 (BASE PROJECT ALLOCATION - $800,000) 18 (LAND ALLOCATION - $10,000) 19 (DESIGN AND CONTINGENCIES - $100,000) 20 (D) IMPROVEMENTS TO EXIT 13 160,000 21 (BASE PROJECT ALLOCATION - $60,000) 22 (LAND ALLOCATION - $25,000) 23 (DESIGN AND CONTINGENCIES - $75,000) 24 (E) I-83 FROM MARYLAND STATE LINE TO 25 CUMBERLAND COUNTY LINE, PAVEMENT 26 RESTORATION, BRIDGE REHABILITATION AND 27 SAFETY IMPROVEMENTS 4,050,000 28 (BASE PROJECT ALLOCATION - $4,000,000) 29 (DESIGN AND CONTINGENCIES - $50,000) 30 (IV) S.R.0181 19990H1023B3629 - 202 -
1 (A) IMPROVEMENT OF INTERSECTION WITH 2 S.R.0921, MANCHESTER BOROUGH 120,000 3 (BASE PROJECT ALLOCATION - $15,000) 4 (LAND ALLOCATION - $30,000) 5 (DESIGN AND CONTINGENCIES - $75,000) 6 (V) S.R.0194 7 (A) IMPROVEMENT OF INTERSECTION WITH 8 S.R.4012, WASHINGTON TOWNSHIP 450,000 9 (BASE PROJECT ALLOCATION - $150,000) 10 (LAND ALLOCATION - $100,000) 11 (DESIGN AND CONTINGENCIES - $200,000) 12 (VI) S.R.0462 13 (A) RECONSTRUCTION OF INTERSECTION WITH 14 HOKES MILL 70,000 15 (BASE PROJECT ALLOCATION - $20,000) 16 (LAND ALLOCATION - $10,000) 17 (DESIGN AND CONTINGENCIES - $40,000) 18 (B) WIDEN FROM S.R.0024 TO LOCUST GROVE 19 ROAD, SPRINGETTSBURY TOWNSHIP 340,000 20 (BASE PROJECT ALLOCATION - $300,000) 21 (LAND ALLOCATION - $10,000) 22 (DESIGN AND CONTINGENCIES - $30,000) 23 (VII) S.R.1033 24 (A) INTERSECTION IMPROVEMENTS WITH 25 S.R.1012 AND S.R.0024, SPRINGETTSBURY 26 TOWNSHIP 260,000 27 (BASE PROJECT ALLOCATION - $200,000) 28 (LAND ALLOCATION - $10,000) 29 (DESIGN AND CONTINGENCIES - $50,000) 30 (VIII) S.R.3072 19990H1023B3629 - 203 -
1 (A) REALIGN MOULSTOWN ROAD FROM S.R.0194 2 TO PENN TOWNSHIP LINE, HANOVER BOROUGH 400,000 3 (BASE PROJECT ALLOCATION - $320,000) 4 (LAND ALLOCATION - $20,000) 5 (DESIGN AND CONTINGENCIES - $60,000) 6 (IX) S.R.0094 7 (A) WIDEN S.R.0094 FROM HANOVER ROAD TO 8 KUHN DRIVE 10,306,000 9 (BASE PROJECT ALLOCATION - $8,420,000) 10 (LAND ALLOCATION - $206,000) 11 (DESIGN AND CONTINGENCIES - $1,680,000) 12 (B) WIDEN AND SPOT RESURFACE S.R.0094 FROM 13 GRANGER AVENUE AND SOUTH 1,361,000 14 (BASE PROJECT ALLOCATION - $1,130,000) 15 (LAND ALLOCATION - $6,000) 16 (DESIGN AND CONTINGENCIES - $225,000) 17 (X) S.R.3068 18 (A) WIDEN, RECONSTRUCTION AND 19 SIGNALIZATION OF INTERSECTION WITH 20 S.R.3070 AND BREEZEWOOD DRIVE, PENN 21 TOWNSHIP 510,000 22 (BASE PROJECT ALLOCATION - $410,000) 23 (LAND ALLOCATION - $20,000) 24 (DESIGN AND CONTINGENCIES - $80,000) 25 (XI) CENTER STREET 26 (A) WIDEN AND RECONSTRUCTION OF CENTER 27 STREET FROM S.R.0116 TO RIDGE AVENUE, 28 HANOVER BOROUGH AND PENN TOWNSHIP 1,500,000 29 (BASE PROJECT ALLOCATION - $1,240,000) 30 (LAND ALLOCATION - $10,000) 19990H1023B3629 - 204 -
1 (DESIGN AND CONTINGENCIES - $250,000) 2 (XII) S.R.0024 3 (A) WIDEN S.R.0024 FROM CAROL ROAD TO 4 WINDSOR ROAD 5,200,000 5 (BASE PROJECT ALLOCATION - $2,000,000) 6 (LAND ALLOCATION - $700,000) 7 (DESIGN AND CONTINGENCIES - $2,500,000) 8 (XIII) S.R.0124 9 (A) REALIGN S.R.0124 BY REMOVAL OF S CURVE 10 NEAR CHRISTENSEN ROAD 2,700,000 11 (BASE PROJECT ALLOCATION - $1,100,000) 12 (LAND ALLOCATION - $200,000) 13 (DESIGN AND CONTINGENCIES - $1,400,000) 14 (XIV) S.R.2005 15 (A) CAMP BETTY WASHINGTON ROAD, 16 ENGINEERING AND ENVIRONMENTAL STUDY 250,000 17 (DESIGN AND CONTINGENCIES - $250,000) 18 (XV) S.R.0015 19 (A) U.S.15 FROM ADAMS COUNTY LINE TO 20 CUMBERLAND COUNTY LINE, PAVEMENT 21 RESTORATION, BRIDGE REHABILITATION AND 22 SAFETY IMPROVEMENTS 950,000 23 (BASE PROJECT ALLOCATION - $900,000) 24 (DESIGN AND CONTINGENCIES - $50,000) 25 (67) RAILROAD CROSSING PROJECTS 26 (I) ALLEGHENY COUNTY 27 (A) PURCHASE ROOK YARD AND RIGHT-OF-WAY 28 SOUTH TO BRIDGEVILLE FROM WHEELING AND 29 LAKE ERIE RAILROAD FOR USE AS NEW 30 TRANSPORTATION CORRIDOR 16,500,000 19990H1023B3629 - 205 -
1 (II) BEDFORD COUNTY 2 (A) INTERMODAL AND RAIL AND HIGHWAY 3 ANALYSIS FOR BUSINESS DEVELOPMENT IN 4 BEDFORD AND BLAIR COUNTIES 300,000 5 (III) BERKS COUNTY 6 (A) BOROUGH OF TOPTON, REPAIR OF CONRAIL 7 CROSSING GATES 100,000 8 (IV) LUZERNE COUNTY 9 (A) BISCONTINI DISTRIBUTION CENTERS 10 RELOCATE AND REHABILITATE RAIL SIDING 11 TO BISCONTINI DISTRIBUTION CENTER TO 12 HANDLE LARGER, SPECIAL PURPOSE RAIL 13 CARS AND TO HANDLE INCREASE IN VOLUME, 14 INCLUDING TWO RAIL SPURS, AN ADDITIONAL 15 RAIL SWITCH, PREPARATION OF RAIL 16 INFRASTRUCTURE AND RECONSTRUCTION OF 17 INTERMODAL YARD INCLUDING ACCESS AND 18 TEMPORARY STORAGE 866,000 19 (V) PHILADELPHIA COUNTY 20 (A) CLEARANCE PROJECT TO CSX LINE 21 BEGINNING AT PARK JUNCTION IN NORTH 22 PHILADELPHIA AND CONTINUING NORTH TO 23 THE PENNSYLVANIA/NEW JERSEY STATE LINE 10,000,000 24 (B) REHABILITATION OF TRACK, INCLUDING 25 RAIL, TIES, SWITCHES AND ANY OTHER 26 TRACK-RELATED REPAIR WORK AND THE 27 PURCHASE OF REQUIRED LOADING AND 28 UNLOADING EQUIPMENT FOR USE AT THE RAIL 29 FACILITY AT GIRARD POINT 900,000 30 (VI) MONROE COUNTY 19990H1023B3629 - 206 -
1 (A) MONROE RAIL AUTHORITY, IMPROVEMENT AND 2 UPGRADE OF 10 RAILROAD CROSSINGS 1,500,000 3 (VII) ALLEGHENY AND EASTERN RAILROAD, INC. 4 (A) REPAIR AND/OR REHABILITATION OF GRADE 5 CROSSINGS, INCLUDING TRACKS, TIES, 6 SURFACES, SUBSURFACES, SIGNALS, 7 AUTOMATIC OR MANUAL PROTECTION AND ANY 8 OTHER RELATED WORK 462,000 9 (VIII) ALLEGHENY VALLEY RAILROAD 10 (A) REPAIR AND/OR REHABILITATION OF GRADE 11 CROSSINGS, INCLUDING TRACKS, TIES, 12 SURFACES, SUBSURFACES, SIGNALS, 13 AUTOMATIC OR MANUAL PROTECTION AND ANY 14 OTHER RELATED WORK 207,000 15 (IX) BRADFORD INDUSTRIAL RAILROAD, INC. 16 (A) REPAIR AND/OR REHABILITATION OF GRADE 17 CROSSINGS, INCLUDING TRACKS, TIES, 18 SURFACES, SUBSURFACES, SIGNALS, 19 AUTOMATIC OR MANUAL PROTECTION AND ANY 20 OTHER RELATED WORK 45,000 21 (X) BUFFALO AND PITTSBURGH RAILROAD, INC. 22 (A) REPAIR AND/OR REHABILITATION OF GRADE 23 CROSSINGS, INCLUDING TRACKS, TIES, 24 SURFACES, SUBSURFACES, SIGNALS, 25 AUTOMATIC OR MANUAL PROTECTION AND ANY 26 OTHER RELATED WORK 508,000 27 (XI) DELAWARE AND HUDSON RAILWAY CO. 28 (A) REPAIR AND/OR REHABILITATION OF GRADE 29 CROSSINGS, INCLUDING TRACKS, TIES, 30 SURFACES, SUBSURFACES, SIGNALS, 19990H1023B3629 - 207 -
1 AUTOMATIC OR MANUAL PROTECTION AND ANY 2 OTHER RELATED WORK 172,000 3 (B) REPLACEMENT OF SIGNAL FACILITIES WITH 4 SOLID STATE INTERLOCKINGS AND 5 ASSOCIATED CABLING, TRACK SIDE SIGNALS 6 AND ELECTRONICS 660,000 7 (BASE PROJECT ALLOCATION - $600,000) 8 (DESIGN AND CONTINGENCIES - $60,000) 9 (C) REHABILITATE CROSSING AT S.R.0339 WITH 10 NEW STATE-OF-THE-ART AUTOMATIC HIGHWAY 11 WARNING DEVICES AND NEW CROSSING 12 SURFACE INCLUDING TRACK AND RAIL 13 INTERFACE MATERIALS 259,000 14 (BASE PROJECT ALLOCATION - $235,000) 15 (DESIGN AND CONTINGENCIES - $24,000) 16 (XII) DELAWARE AND LACKAWANNA RAILROAD COMPANY 17 (A) REPAIR AND/OR REHABILITATION OF GRADE 18 CROSSINGS INCLUDING TRACKS, TIES, 19 SURFACES, SUBSURFACES, SIGNALS, 20 AUTOMATIC OR MANUAL PROTECTION AND ANY 21 OTHER RELATED WORK 630,000 22 (XIII) EMONS TRANSPORTATION GROUP, INC. 23 (A) REPAIR AND/OR REHABILITATION OF GRADE 24 CROSSINGS, INCLUDING TRACKS, TIES, 25 SURFACES, SUBSURFACES, AUTOMATIC OR 26 MANUAL PROTECTION AND ANY OTHER RELATED 27 WORK 28 (I) MARYLAND AND PENNSYLVANIA 29 RAILROAD 570,000 30 (II) PENN EASTERN RAIL LINES, INC., 19990H1023B3629 - 208 -
1 LANCASTER LINE 789,000 2 (III) PERKIOMEN LINE 405,000 3 (IV) YORKRAIL, INC. 640,000 4 (XIV) EVERETT RAILROAD 5 (A) REPAIR AND/OR REHABILITATION OF GRADE 6 CROSSINGS, INCLUDING TRACKS, TIES, 7 SURFACES, SUBSURFACES, AUTOMATIC OR 8 MANUAL PROTECTION AND ANY OTHER RELATED 9 WORK 270,000 10 (XV) GETTYSBURG RAILROAD COMPANY, INC. 11 (A) REPAIR AND/OR REHABILITATION OF GRADE 12 CROSSINGS, INCLUDING TRACKS, TIES, 13 SURFACES, SUBSURFACES, SIGNALS, 14 AUTOMATIC OR MANUAL PROTECTION AND ANY 15 OTHER RELATED WORK 460,000 16 (XVI) HOLLIDAYSBURG AND ROARING SPRING 17 RAILROAD 18 (A) REPAIR AND/OR REHABILITATION OF GRADE 19 CROSSINGS, INCLUDING TRACKS, TIES, 20 SURFACES, SUBSURFACES, SIGNALS, 21 AUTOMATIC OR MANUAL PROTECTION AND ANY 22 OTHER RELATED WORK 400,000 23 (XVII) JUNIATA VALLEY RAILROAD 24 (A) REPAIR AND/OR REHABILITATION OF GRADE 25 CROSSINGS, INCLUDING TRACKS, TIES, 26 SURFACES, SUBSURFACES, SIGNALS, 27 AUTOMATIC OR MANUAL PROTECTION AND ANY 28 OTHER RELATED WORK 133,000 29 (XVIII) LYCOMING VALLEY RAILROAD 30 (A) REPAIR AND/OR REHABILITATION OF GRADE 19990H1023B3629 - 209 -
1 CROSSINGS, INCLUDING TRACKS, TIES, 2 SURFACES, SUBSURFACES, SIGNALS, 3 AUTOMATIC OR MANUAL PROTECTION AND ANY 4 OTHER RELATED WORK 116,000 5 (XIX) MIDDLETOWN AND HUMMELSTOWN RAILROAD CO. 6 (A) REPAIR AND REHABILITATION OF GRADE 7 CROSSING AT ROUTE 230, INCLUDING 8 TRACKS, TIES, SURFACES, SUBSURFACES AND 9 ANY OTHER RELATED WORK TO ENSURE 10 CONTINUED REGULATORY COMPLIANCE AND 11 ENHANCE PUBLIC SAFETY 30,000 12 (XX) MORRISON'S COVE RAILROAD 13 (A) REPAIR AND/OR REHABILITATION OF GRADE 14 CROSSINGS, INCLUDING TRACKS, TIES, 15 SURFACES, SUBSURFACES, SIGNALS, 16 AUTOMATIC OR MANUAL PROTECTION AND ANY 17 OTHER RELATED WORK 120,000 18 (XXI) NITTANY BALD EAGLE RAILROAD 19 (A) REPAIR AND/OR REHABILITATION OF GRADE 20 CROSSINGS, INCLUDING TRACKS, TIES, 21 SURFACES, SUBSURFACES, SIGNALS, 22 AUTOMATIC OR MANUAL PROTECTION AND ANY 23 OTHER RELATED WORK 287,000 24 (XXII) NORTH SHORE RAILROAD 25 (A) REPAIR AND/OR REHABILITATION OF GRADE 26 CROSSINGS, INCLUDING TRACKS, TIES, 27 SURFACES, SUBSURFACES, SIGNALS, 28 AUTOMATIC OR MANUAL PROTECTION AND ANY 29 OTHER RELATED WORK 62,000 30 (XXIII) PITTSBURGH & SHAWMUT RAILROAD, INC. 19990H1023B3629 - 210 -
1 (A) REPAIR AND/OR REHABILITATION OF GRADE 2 CROSSINGS, INCLUDING TRACKS, TIES, 3 SURFACES, SUBSURFACES, SIGNALS, 4 AUTOMATIC OR MANUAL PROTECTION AND ANY 5 OTHER RELATED WORK 343,000 6 (XXIV) READING, BLUE MOUNTAIN AND NORTHERN 7 RAILROAD COMPANY 8 (A) REPAIR AND/OR REHABILITATION OF GRADE 9 CROSSINGS, INCLUDING TRACKS, TIES, 10 SURFACES, SUBSURFACES, SIGNALS, 11 AUTOMATIC OR MANUAL PROTECTION AND ANY 12 OTHER RELATED WORK 850,000 13 (XXV) SEDA-COG JOINT RAIL AUTHORITY 14 (A) REPAIR AND/OR REHABILITATION OF GRADE 15 CROSSINGS, INCLUDING TRACKS, TIES, 16 SURFACES, SUBSURFACES, SIGNALS, 17 AUTOMATIC OR MANUAL PROTECTION AND ANY 18 OTHER RELATED WORK 19 (I) JUNIATA VALLEY RAILROAD 50,000 20 (II) LYCOMING VALLEY RAILROAD 167,000 21 (III) NITTANY & BALD EAGLE 260,000 22 (IV) NORTH SHORE RAILROAD 200,000 23 (V) SHAMOKIN VALLEY RAILROAD 127,000 24 (XXVI) SHAMOKIN VALLEY RAILROAD 25 (A) REPAIR AND/OR REHABILITATION OF GRADE 26 CROSSINGS, INCLUDING TRACKS, TIES, 27 SURFACES, SUBSURFACES, SIGNALS, 28 AUTOMATIC OR MANUAL PROTECTION AND ANY 29 OTHER RELATED WORK 672,000 30 (XXVII) WELLSBORO AND CORNING RAIL LINE 19990H1023B3629 - 211 -
1 (A) REPAIR AND/OR REHABILITATION OF GRADE 2 CROSSINGS, INCLUDING TRACKS, TIES, 3 SURFACES, SUBSURFACES, SIGNALS, 4 AUTOMATIC OR MANUAL PROTECTION AND ANY 5 OTHER RELATED WORK 86,000 6 (XXVIII) WHEELING AND LAKE ERIE RAILWAY 7 COMPANY 8 (A) REPAIR AND/OR REHABILITATION OF GRADE 9 CROSSINGS, INCLUDING TRACKS, TIES, 10 SURFACES, SUBSURFACES, SIGNALS, 11 AUTOMATIC OR MANUAL PROTECTION AND ANY 12 OTHER RELATED WORK 645,000 13 (XXIX) STATEWIDE 14 (A) ACQUISITION AND INSTALLATION OF 15 CONSTANT WARNING TIME DEVICES TO 16 UPGRADE AND IMPROVE SAFETY OF HIGHWAY- 17 RAIL GRADE CROSSINGS ON ANY ROAD 18 INCLUDING LOCAL ROADS. TWENTY PERCENT 19 OF THE COST OF EACH SUCH ACQUISITION 20 AND INSTALLATION SHALL BE PAID BY THE 21 RAILROAD THAT OWNS THE TRACK UPON WHICH 22 THE IMPROVEMENTS ARE BEING INSTALLED 10,000,000 23 SECTION 12. ITEMIZATION OF PENNSYLVANIA FISH AND BOAT 24 COMMISSION CAPITAL PROJECTS. 25 THE INDIVIDUAL CAPITAL PROJECTS IN THE CATEGORY OF PUBLIC 26 IMPROVEMENT PROJECTS TO BE ACQUIRED OR DEVELOPED BY THE 27 PENNSYLVANIA FISH AND BOAT COMMISSION AND TO BE FINANCED FROM 28 CURRENT REVENUES OF THE FISH FUND AND THE BOAT FUND PURSUANT TO 29 EXECUTIVE AUTHORIZATIONS ARE HEREBY ITEMIZED TOGETHER WITH THEIR 30 RESPECTIVE ESTIMATED COSTS, AS FOLLOWS: 19990H1023B3629 - 212 -
1 TOTAL 2 PROJECT 3 PROJECT ALLOCATION 4 (1) PENNSYLVANIA FISH AND BOAT COMMISSION 5 (I) LEHIGH COUNTY 6 (A) IMPROVEMENTS AND REPAIRS TO THE DAM 7 AND SPILLWAY AT LEASER LAKE 1,200,000 8 (BASE PROJECT ALLOCATION - $1,000,000) 9 (DESIGN AND CONTINGENCIES - $200,000) 10 SECTION 13. ITEMIZATION OF PENNSYLVANIA GAME COMMISSION CAPITAL 11 PROJECTS. 12 THE INDIVIDUAL CAPITAL PROJECTS IN THE CATEGORY OF PUBLIC 13 IMPROVEMENT PROJECTS TO BE ACQUIRED BY THE PENNSYLVANIA GAME 14 COMMISSION, AND TO BE FINANCED FROM CURRENT REVENUES OF THE GAME 15 FUND PURSUANT TO EXECUTIVE AUTHORIZATIONS, ARE HEREBY ITEMIZED, 16 TOGETHER WITH THEIR RESPECTIVE ESTIMATED COSTS, AS FOLLOWS: 17 (1) CLINTON COUNTY 18 (I) LAND ACQUISITION - 3,300 ACRES 570,000 19 SECTION 14. ITEMIZATION OF GENERAL FUND CURRENT REVENUE 20 PROJECTS. 21 (A) PUBLIC IMPROVEMENT PROJECTS.--THE INDIVIDUAL CAPITAL 22 PROJECTS IN THE CATEGORY OF PUBLIC IMPROVEMENT PROJECTS TO BE 23 CONSTRUCTED OR ACQUIRED BY THE DEPARTMENT OF GENERAL SERVICES, 24 ITS SUCCESSORS OR ASSIGNS, AND TO BE FINANCED FROM GENERAL FUND 25 CURRENT REVENUES, ARE HEREBY ITEMIZED, TOGETHER WITH THEIR 26 RESPECTIVE ESTIMATED FINANCIAL COSTS, AS FOLLOWS: 27 TOTAL 28 PROJECT 29 PROJECT ALLOCATION 30 (1) DEPARTMENT OF CORRECTIONS 19990H1023B3629 - 213 -
1 (I) STATE CORRECTIONAL INSTITUTION - GREENE 2 (A) INSTALLATION OF PERIMETER FENCE 600,000 3 (BASE PROJECT ALLOCATION - $500,000) 4 (DESIGN AND CONTINGENCIES - $100,000) 5 (II) STATE REGIONAL CORRECTIONAL FACILITY - 6 MERCER 7 (A) INSTALLATION OF PERIMETER FENCE 810,000 8 (BASE PROJECT ALLOCATION - $675,000) 9 (DESIGN AND CONTINGENCIES - $135,000) 10 (2) DEPARTMENT OF GENERAL SERVICES 11 (I) CAPITOL AREA BUILDINGS 12 (A) CONSTRUCTION OF THE COMMONWEALTH MAIL 13 PROCESSING AND LEGISLATIVE SERVICES 14 FACILITY 5,000,000 15 (B) FURNITURE AND EQUIPMENT.--THE INDIVIDUAL CAPITAL 16 PROJECTS IN THE CATEGORY OF PUBLIC IMPROVEMENT PROJECTS 17 CONSISTING OF THE ACQUISITION OF ORIGINAL FURNITURE AND 18 EQUIPMENT TO COMPLETE PUBLIC IMPROVEMENT PROJECTS AND TO BE 19 PURCHASED BY THE DEPARTMENT OF GENERAL SERVICES, ITS SUCCESSORS 20 OR ASSIGNS AND TO BE FINANCED FROM GENERAL FUND CURRENT REVENUES 21 ARE HEREBY ITEMIZED TOGETHER WITH THEIR RESPECTIVE ITEMIZED 22 COSTS AS FOLLOWS: 23 TOTAL 24 PROJECT 25 PROJECT ALLOCATION 26 (1) DEPARTMENT OF GENERAL SERVICES 27 (I) CAPITOL AREA BUILDINGS 28 (A) FURNITURE AND EQUIPMENT FOR 29 COMMONWEALTH MAIL PROCESSING AND 30 LEGISLATIVE SERVICES FACILITY 8,000,000 19990H1023B3629 - 214 -
1 SECTION 15. ITEMIZATION OF MOTOR LICENSE FUND CURRENT REVENUES. 2 THE INDIVIDUAL CAPITAL PROJECTS IN THE CATEGORY OF PUBLIC 3 IMPROVEMENT PROJECTS TO BE DEVELOPED BY THE DEPARTMENT OF 4 GENERAL SERVICES, ITS SUCCESSORS OR ASSIGNS, FOR THE DEPARTMENT 5 OF TRANSPORTATION ARE HEREBY ITEMIZED TOGETHER WITH THEIR 6 RESPECTIVE ITEMIZED COSTS AS FOLLOWS: 7 TOTAL 8 PROJECT 9 PROJECT ALLOCATION 10 (1) DEPARTMENT OF TRANSPORTATION 11 (I) HIGHWAY MAINTENANCE FACILITY, CUMBERLAND 12 COUNTY 13 (A) CONSTRUCT OR ACQUIRE A REPLACEMENT 14 MAINTENANCE FACILITY 4,000,000 15 (BASE PROJECT ALLOCATION - $4,000,000) 16 (II) EXPAND/REPLACE DRIVER LICENSING CENTER, 17 ALLEGHENY COUNTY 18 (A) EXPAND OR REPLACE THE DRIVER LICENSING 19 FACILITY AT NEW KENSINGTON 1,000,000 20 (BASE PROJECT ALLOCATION - $1,000,000) 21 (III) HIGHWAY MAINTENANCE FACILITY, SULLIVAN 22 COUNTY 23 (A) CONSTRUCT OR ACQUIRE A REPLACEMENT 24 MAINTENANCE FACILITY 2,500,000 25 (BASE PROJECT ALLOCATION - $2,500,000) 26 SECTION 16. LIMITED WAIVER OF LOCAL REQUIREMENTS. 27 THE LIMITATION ON DEPARTMENT OF TRANSPORTATION FUNDING OF 28 CAPITAL PROJECTS UNDER 74 PA.C.S. § 1302(4) (RELATING TO PROGRAM 29 AUTHORIZATIONS) SHALL BE TOTALLY WAIVED FOR THE CAPITAL PROJECTS 30 IN THE CATEGORY OF TRANSPORTATION ASSISTANCE PROJECTS FOR MASS 19990H1023B3629 - 215 -
1 TRANSIT CONTAINED IN SECTION 6(A)(10)(VII), (VIII), (XII) AND 2 (XIII). 3 SECTION 17. DEBT AUTHORIZATION. 4 (A) PUBLIC IMPROVEMENTS.--THE GOVERNOR, AUDITOR GENERAL AND 5 STATE TREASURER ARE HEREBY AUTHORIZED AND DIRECTED TO BORROW 6 FROM TIME TO TIME IN ADDITION TO ANY AUTHORIZATION HERETOFORE OR 7 HEREAFTER ENACTED, ON THE CREDIT OF THE COMMONWEALTH, SUBJECT TO 8 THE LIMITATIONS PROVIDED IN THE CURRENT CAPITAL BUDGET, MONEY 9 NOT EXCEEDING IN THE AGGREGATE THE SUM OF $557,240,000 AS MAY BE 10 FOUND NECESSARY TO CARRY OUT THE ACQUISITION AND CONSTRUCTION OF 11 THE PUBLIC IMPROVEMENT PROJECTS SPECIFICALLY ITEMIZED IN A 12 CAPITAL BUDGET. 13 (B) FURNITURE AND EQUIPMENT.--THE GOVERNOR, AUDITOR GENERAL 14 AND STATE TREASURER ARE HEREBY AUTHORIZED AND DIRECTED TO BORROW 15 FROM TIME TO TIME IN ADDITION TO ANY AUTHORIZATION HERETOFORE OR 16 HEREAFTER ENACTED, ON THE CREDIT OF THE COMMONWEALTH, SUBJECT TO 17 THE LIMITATIONS PROVIDED IN THE CURRENT CAPITAL BUDGET, MONEY 18 NOT EXCEEDING IN THE AGGREGATE THE SUM OF $16,194,000 AS MAY BE 19 FOUND NECESSARY TO CARRY OUT THE PUBLIC IMPROVEMENT PROJECTS 20 CONSISTING OF THE ACQUISITION OF ORIGINAL MOVABLE FURNITURE AND 21 EQUIPMENT SPECIFICALLY ITEMIZED IN A CAPITAL BUDGET. 22 (C) TRANSPORTATION ASSISTANCE.--THE GOVERNOR, AUDITOR 23 GENERAL AND STATE TREASURER ARE HEREBY AUTHORIZED AND DIRECTED 24 TO BORROW FROM TIME TO TIME IN ADDITION TO ANY AUTHORIZATION 25 HERETOFORE OR HEREAFTER ENACTED, ON THE CREDIT OF THE 26 COMMONWEALTH, SUBJECT TO THE LIMITATIONS PROVIDED IN THE CURRENT 27 CAPITAL BUDGET, MONEY NOT EXCEEDING IN THE AGGREGATE THE SUM OF 28 $561,168,000 AS MAY BE FOUND NECESSARY TO CARRY OUT THE 29 ACQUISITION AND CONSTRUCTION OF THE TRANSPORTATION ASSISTANCE 30 PROJECTS SPECIFICALLY ITEMIZED IN A CAPITAL BUDGET. 19990H1023B3629 - 216 -
1 (D) REDEVELOPMENT ASSISTANCE.--SUBJECT TO THE LIMITATION IN 2 SECTION 317(B) OF THE ACT OF FEBRUARY 1, 1999 (P.L.1, NO.1), 3 KNOWN AS THE CAPITAL FACILITIES DEBT ENABLING ACT, THE GOVERNOR, 4 AUDITOR GENERAL AND STATE TREASURER ARE HEREBY AUTHORIZED AND 5 DIRECTED TO BORROW FROM TIME TO TIME IN ADDITION TO ANY 6 AUTHORIZATION HERETOFORE OR HEREAFTER ENACTED, ON THE CREDIT OF 7 THE COMMONWEALTH, SUBJECT TO THE LIMITATIONS PROVIDED IN THE 8 CURRENT CAPITAL BUDGET, MONEY NOT EXCEEDING IN THE AGGREGATE THE 9 SUM OF $540,413,000 AS MAY BE FOUND NECESSARY TO CARRY OUT THE 10 REDEVELOPMENT ASSISTANCE AND THE REDEVELOPMENT CAPITAL 11 ASSISTANCE PROJECTS SPECIFICALLY ITEMIZED IN A CAPITAL BUDGET. 12 (E) FLOOD CONTROL.--THE GOVERNOR, AUDITOR GENERAL AND STATE 13 TREASURER ARE HEREBY AUTHORIZED AND DIRECTED TO BORROW FROM TIME 14 TO TIME IN ADDITION TO ANY AUTHORIZATION HERETOFORE OR HEREAFTER 15 ENACTED, ON THE CREDIT OF THE COMMONWEALTH, SUBJECT TO THE 16 LIMITATIONS PROVIDED IN THE CURRENT CAPITAL BUDGET, MONEY NOT 17 EXCEEDING IN THE AGGREGATE THE SUM OF $7,859,000 AS MAY BE FOUND 18 NECESSARY TO CARRY OUT THE ACQUISITION AND CONSTRUCTION OF THE 19 FLOOD CONTROL PROJECTS SPECIFICALLY ITEMIZED IN A CAPITAL 20 BUDGET. 21 (F) HIGHWAY PROJECTS.--THE GOVERNOR, AUDITOR GENERAL AND 22 STATE TREASURER ARE HEREBY AUTHORIZED AND DIRECTED TO BORROW, 23 FROM TIME TO TIME, IN ADDITION TO ANY AUTHORIZATION HERETOFORE 24 OR HEREAFTER ENACTED, ON THE CREDIT OF THE COMMONWEALTH, SUBJECT 25 TO THE LIMITATIONS PROVIDED IN THE CURRENT CAPITAL BUDGET, MONEY 26 NOT EXCEEDING IN THE AGGREGATE THE SUM OF $2,416,468,000 AS MAY 27 BE FOUND NECESSARY TO CARRY OUT THE ACQUISITION AND CONSTRUCTION 28 OF THE HIGHWAY PROJECTS SPECIFICALLY ITEMIZED IN SECTION 11 OF 29 THIS CAPITAL BUDGET. 30 SECTION 18. ISSUE OF BONDS. 19990H1023B3629 - 217 -
1 THE INDEBTEDNESS AUTHORIZED IN THIS ACT SHALL BE INCURRED, 2 FROM TIME TO TIME, AND SHALL BE EVIDENCED BY ONE OR MORE SERIES 3 OF GENERAL OBLIGATION BONDS OF THE COMMONWEALTH IN SUCH 4 AGGREGATE PRINCIPAL AMOUNT FOR EACH SERIES AS THE GOVERNOR, THE 5 AUDITOR GENERAL AND THE STATE TREASURER SHALL DETERMINE, BUT THE 6 LATEST STATED MATURITY DATE SHALL NOT EXCEED THE ESTIMATED 7 USEFUL LIFE OF THE PROJECTS BEING FINANCED AS STATED IN SECTION 8 19. 9 SECTION 19. ESTIMATED USEFUL LIFE AND TERM OF DEBT. 10 (A) ESTIMATED USEFUL LIFE.--THE GENERAL ASSEMBLY STATES THAT 11 THE ESTIMATED USEFUL LIFE OF THE PUBLIC IMPROVEMENT PROJECTS 12 ITEMIZED IN THIS ACT IS AS FOLLOWS: 13 (1) PUBLIC IMPROVEMENT PROJECTS, 30 YEARS. 14 (2) FURNITURE AND EQUIPMENT PROJECTS, 10 YEARS. 15 (3) TRANSPORTATION ASSISTANCE PROJECTS: 16 (I) ROLLING STOCK, 15 YEARS. 17 (II) PASSENGER BUSES, 12 YEARS. 18 (III) FURNITURE AND EQUIPMENT, 10 YEARS. 19 (IV) ALL OTHERS, 30 YEARS. 20 (4) PUBLIC HIGHWAY PROJECTS, 30 YEARS. 21 (B) TERM OF DEBT.--THE MAXIMUM TERM OF THE DEBT AUTHORIZED 22 TO BE INCURRED UNDER THIS ACT IS 30 YEARS. 23 SECTION 20. APPROPRIATIONS. 24 (A) PUBLIC IMPROVEMENTS.--THE NET PROCEEDS OF THE SALE OF 25 THE OBLIGATIONS AUTHORIZED IN THIS ACT ARE HEREBY APPROPRIATED 26 FROM THE CAPITAL FACILITIES FUND TO THE DEPARTMENT OF GENERAL 27 SERVICES IN THE MAXIMUM AMOUNT OF $557,240,000 TO BE USED BY IT 28 EXCLUSIVELY TO DEFRAY THE FINANCIAL COST OF THE PUBLIC 29 IMPROVEMENT PROJECTS SPECIFICALLY ITEMIZED IN A CAPITAL BUDGET. 30 AFTER RESERVING OR PAYING THE EXPENSES OF THE SALE OF THE 19990H1023B3629 - 218 -
1 OBLIGATION, THE STATE TREASURER SHALL PAY TO THE DEPARTMENT OF 2 GENERAL SERVICES THE MONEYS AS REQUIRED AND CERTIFIED BY IT TO 3 BE LEGALLY DUE AND PAYABLE. 4 (B) FURNITURE AND EQUIPMENT.--THE NET PROCEEDS OF THE SALE 5 OF THE OBLIGATIONS AUTHORIZED IN THIS ACT ARE HEREBY 6 APPROPRIATED FROM THE CAPITAL FACILITIES FUND TO THE DEPARTMENT 7 OF GENERAL SERVICES IN THE MAXIMUM AMOUNT OF $16,194,000 TO BE 8 USED BY IT EXCLUSIVELY TO DEFRAY THE FINANCIAL COST OF THE 9 PUBLIC IMPROVEMENT PROJECTS CONSISTING OF THE ACQUISITION OF 10 ORIGINAL MOVABLE FURNITURE AND EQUIPMENT SPECIFICALLY ITEMIZED 11 IN A CAPITAL BUDGET. AFTER RESERVING OR PAYING THE EXPENSES OF 12 THE SALE OF THE OBLIGATION, THE STATE TREASURER SHALL PAY TO THE 13 DEPARTMENT OF GENERAL SERVICES THE MONEYS AS REQUIRED AND 14 CERTIFIED BY IT TO BE LEGALLY DUE AND PAYABLE. 15 (C) TRANSPORTATION ASSISTANCE.--THE NET PROCEEDS OF THE SALE 16 OF THE OBLIGATIONS AUTHORIZED IN THIS ACT ARE HEREBY 17 APPROPRIATED FROM THE CAPITAL FACILITIES FUND TO THE DEPARTMENT 18 OF TRANSPORTATION IN THE MAXIMUM AMOUNT OF $561,168,000 TO BE 19 USED BY IT EXCLUSIVELY TO DEFRAY THE FINANCIAL COST OF THE 20 TRANSPORTATION ASSISTANCE PROJECTS SPECIFICALLY ITEMIZED IN A 21 CAPITAL BUDGET. AFTER RESERVING OR PAYING THE EXPENSE OF THE 22 SALE OF THE OBLIGATION, THE STATE TREASURER SHALL PAY TO THE 23 DEPARTMENT OF TRANSPORTATION THE MONEYS AS REQUIRED AND 24 CERTIFIED BY IT TO BE LEGALLY DUE AND PAYABLE. 25 (D) REDEVELOPMENT ASSISTANCE.--THE NET PROCEEDS OF THE SALE 26 OF THE OBLIGATIONS AUTHORIZED IN THIS ACT ARE HEREBY 27 APPROPRIATED FROM THE CAPITAL FACILITIES FUND TO THE DEPARTMENT 28 OF COMMUNITY AND ECONOMIC DEVELOPMENT IN THE MAXIMUM AMOUNT OF 29 $540,413,000 TO BE USED BY IT EXCLUSIVELY TO DEFRAY THE 30 FINANCIAL COST OF THE REDEVELOPMENT ASSISTANCE AND REDEVELOPMENT 19990H1023B3629 - 219 -
1 CAPITAL ASSISTANCE PROJECTS SPECIFICALLY ITEMIZED IN A CAPITAL 2 BUDGET. AFTER RESERVING OR PAYING THE EXPENSES OF THE SALE OF 3 THE OBLIGATION, THE STATE TREASURER SHALL PAY TO THE DEPARTMENT 4 OF COMMUNITY AND ECONOMIC DEVELOPMENT THE MONEYS AS REQUIRED AND 5 CERTIFIED BY IT TO BE LEGALLY DUE AND PAYABLE. 6 (E) FLOOD CONTROL.--THE NET PROCEEDS OF THE SALE OF THE 7 OBLIGATIONS AUTHORIZED IN THIS ACT ARE HEREBY APPROPRIATED FROM 8 THE CAPITAL FACILITIES FUND TO THE DEPARTMENT OF ENVIRONMENTAL 9 PROTECTION IN THE MAXIMUM AMOUNT OF $7,859,000 TO BE USED BY IT 10 EXCLUSIVELY TO DEFRAY THE FINANCIAL COST OF THE FLOOD CONTROL 11 PROJECTS SPECIFICALLY ITEMIZED IN A CAPITAL BUDGET. AFTER 12 RESERVING OR PAYING THE EXPENSE OF THE SALE OF THE OBLIGATION, 13 THE STATE TREASURER SHALL PAY TO THE DEPARTMENT OF ENVIRONMENTAL 14 PROTECTION THE MONEYS AS REQUIRED AND CERTIFIED BY IT TO BE 15 LEGALLY DUE AND PAYABLE. 16 (F) HIGHWAY PROJECTS.--THE NET PROCEEDS OF THE SALE OF THE 17 OBLIGATIONS HEREIN AUTHORIZED ARE HEREBY APPROPRIATED FROM THE 18 CAPITAL FACILITIES FUND TO THE DEPARTMENT OF TRANSPORTATION IN 19 THE MAXIMUM AMOUNT OF $2,416,468,000 TO BE USED BY IT 20 EXCLUSIVELY TO DEFRAY THE FINANCIAL COSTS OF THE PROJECTS 21 SPECIFICALLY ITEMIZED IN SECTION 11 OF THIS CAPITAL BUDGET. 22 AFTER RESERVING OR PAYING THE EXPENSES OF THE SALE OF THE 23 OBLIGATION, THE STATE TREASURER SHALL PAY OUT TO THE DEPARTMENT 24 OF TRANSPORTATION THE MONEYS AS REQUIRED AND CERTIFIED BY IT TO 25 BE LEGALLY DUE AND PAYABLE. 26 SECTION 21. FEDERAL FUNDS. 27 (A) PROJECTS ITEMIZED IN THIS ACT.--IN ADDITION TO THOSE 28 FUNDS APPROPRIATED IN SECTION 20, ALL MONEYS RECEIVED FROM THE 29 FEDERAL GOVERNMENT FOR THE PROJECTS SPECIFICALLY ITEMIZED IN 30 THIS ACT ARE ALSO HEREBY APPROPRIATED FOR THOSE PROJECTS. 19990H1023B3629 - 220 -
1 (B) PROJECTS NOT REQUIRING ITEMIZATION.--DEPARTMENT OF 2 MILITARY AND VETERANS AFFAIRS CONSTRUCTION PROJECTS WHICH ARE 3 TOTALLY FEDERALLY FUNDED BUT WHICH ARE TO BE ADMINISTERED BY THE 4 DEPARTMENT OF GENERAL SERVICES ARE HEREBY AUTHORIZED. 5 SECTION 22. LOCAL FUNDS. 6 ALL MONEYS RECEIVED FROM A POLITICAL SUBDIVISION, MUNICIPAL 7 AUTHORITY OR OTHER UNIT OF LOCAL GOVERNMENT FOR THE PROJECT 8 AUTHORIZED IN SECTION 4(2)(XI)(B), ARE ALSO HEREBY APPROPRIATED 9 FOR SAID PROJECT. 10 SECTION 23. EXPIRATION OF AUTHORIZATION AND APPROPRIATION. 11 (A) GENERAL RULE.--THE AUTHORIZATION AND APPROPRIATION FOR 12 THE ADDITIONAL CAPITAL PROJECTS ITEMIZED IN SECTIONS 4, 5, 6, 7, 13 8, 9 AND 10 FOR WHICH CONSTRUCTION CONTRACTS HAVE NOT BEEN 14 EXECUTED WITHIN FOUR YEARS OF THE EFFECTIVE DATE OF THIS ACT 15 SHALL EXPIRE UPON SUCH DATE AND SHALL BE CONSIDERED REPEALED. 16 THE SECRETARY OF THE BUDGET MAY EXTEND AN EXPIRED PROJECT FOR UP 17 TO ONE YEAR UPON WRITTEN NOTIFICATION OF THE CHAIRMAN AND 18 MINORITY CHAIRMAN OF THE APPROPRIATIONS COMMITTEE OF THE SENATE 19 AND THE CHAIRMAN AND MINORITY CHAIRMAN OF THE APPROPRIATIONS 20 COMMITTEE OF THE HOUSE OF REPRESENTATIVES. UPON EXPIRATION OF 21 THE EXTENSION PERIOD, AN EXTENDED PROJECT MAY NOT BE 22 SUBSEQUENTLY EXTENDED. 23 (B) REPORTS.--WHENEVER THE AUTHORIZATION AND APPROPRIATION 24 FOR THE ADDITIONAL CAPITAL PROJECTS ITEMIZED UNDER THIS ACT 25 SHALL EXPIRE PURSUANT TO SUBSECTION (A), THE SECRETARY OF THE 26 BUDGET SHALL, WITHIN 30 DAYS OF THE DATE OF EXPIRATION, PROVIDE 27 TO THE CHAIRMAN AND MINORITY CHAIRMAN OF THE APPROPRIATIONS 28 COMMITTEE OF THE SENATE AND THE CHAIRMAN AND MINORITY CHAIRMAN 29 OF THE APPROPRIATIONS COMMITTEE OF THE HOUSE OF REPRESENTATIVES 30 A REPORT ITEMIZING ALL CAPITAL PROJECTS WHICH HAVE EXPIRED. SUCH 19990H1023B3629 - 221 -
1 REPORT SHALL CONTAIN SPECIFIC REFERENCES TO THE SECTION OF THE 2 ACT WHEREIN THE PROJECTS WHERE ITEMIZED AND SHALL INCLUDE THE 3 PROJECT LOCATION,PROJECT DESCRIPTION AND AUTHORIZED PROJECT 4 AMOUNT. THE REPORT SHALL ALSO AGGREGATE THE TOTAL DOLLAR AMOUNT 5 OF EXPIRED PROJECTS BY CAPITAL PROJECT CATEGORY. 6 SECTION 24. ALLOCATION OF FUNDS. 7 WHENEVER AS DETERMINED BY THE DEPARTMENT OF TRANSPORTATION 8 THAT THE FULL ESTIMATED FINANCIAL COSTS OF THE PROJECTS ITEMIZED 9 IN SECTION 11 ARE NOT NECESSARY FOR THE PROPER DESIGN, 10 ACQUISITION OR CONSTRUCTION OF SUCH PROJECTS, THE EXCESS FUNDS 11 NO LONGER REQUIRED MAY BE ALLOCATED BY THE DEPARTMENT OF 12 TRANSPORTATION TO INCREASE THE ESTIMATED COSTS OF ANY ONE OR 13 MORE OF THE PROJECTS SPECIFICALLY ITEMIZED IN A CAPITAL BUDGET. 14 SECTION 25. RESTRICTION ON CERTAIN FUNDS. 15 (A) RESTRICTION FOR DGS-948-35.--THE NEW AND ADDITIONAL 16 FUNDS PROVIDED FOR DGS-948-35, THE FIRE SAFETY CODE IMPROVEMENTS 17 TO THE CAPITOL COMPLEX SPECIFICALLY RELATING TO THE CAPITOL 18 BUILDING, ITEMIZED IN SECTION 4(6)(II)(E), SHALL ONLY BE 19 DISBURSED UPON THE WRITTEN APPROVAL OF BOTH THE CHIEF CLERK OF 20 THE SENATE AND THE CHIEF CLERK OF THE HOUSE OF REPRESENTATIVES. 21 THE NEW AND ADDITIONAL FUNDS PROVIDED FOR DGS-948-35, THE FIRE 22 SAFETY CODE IMPROVEMENTS RELATING TO THE NORTH OFFICE BUILDING, 23 ITEMIZED IN SECTION 4(6)(II)(E), SHALL ONLY BE DISBURSED UPON 24 THE WRITTEN APPROVAL OF THE CHIEF CLERK OF THE SENATE. THE NEW 25 AND ADDITIONAL FUNDS PROVIDED FOR DGS-948-35, THE FIRE SAFETY 26 CODE IMPROVEMENTS RELATING TO THE SOUTH OFFICE BUILDING, 27 ITEMIZED IN SECTION 4(6)(II)(E), SHALL ONLY BE DISBURSED UPON 28 THE WRITTEN APPROVAL OF THE CHIEF CLERK OF THE HOUSE OF 29 REPRESENTATIVES. 30 (B) RESTRICTION ON CERTAIN FUNDS.--THE NEW AND ADDITIONAL 19990H1023B3629 - 222 -
1 FUNDS PROVIDED IN SECTIONS 4(6)(I)(B), 5(3)(I)(A), 2 14(A)(2)(I)(A) AND (B)(1)(I)(A), FOR THE COMMONWEALTH MAIL 3 PROCESSING AND LEGISLATIVE SERVICES FACILITY, SHALL ONLY BE 4 DISBURSED UPON THE WRITTEN APPROVAL OF THE CHIEF CLERK OF THE 5 SENATE. 6 SECTION 26. REDEVELOPMENT ASSISTANCE CAPITAL PROJECTS. 7 (A) NOTWITHSTANDING ANY OTHER LAW TO THE CONTRARY, THE 8 REQUIREMENTS OF SECTION 318 OF THE ACT OF FEBRUARY 9, 1999 9 (P.L.1, NO.1), KNOWN AS THE CAPITAL FACILITIES DEBT ENABLING 10 ACT, SHALL PROVIDE THE SOLE AND EXCLUSIVE REQUIREMENTS FOR 11 BIDDING FOR THE ACQUISITION, DEVELOPMENT AND CONSTRUCTION OF THE 12 REDEVELOPMENT ASSISTANCE CAPITAL PROJECT ITEMIZED IN SECTION 13 7(23)(I)(A) OF THIS ACT. 14 (B) ANY PUBLIC AUTHORITY SHALL BE ELIGIBLE TO CONTRACT WITH 15 THE COMMONWEALTH TO RECEIVE FUNDS FOR THE ACQUISITION, 16 DEVELOPMENT AND CONSTRUCTION OF THE REDEVELOPMENT ASSISTANCE 17 CAPITAL PROJECT ITEMIZED IN SECTION 7(23)(I)(A) OF THIS ACT. 18 (C) NOTHING IN THIS SECTION SHALL BE CONSTRUED TO OVERRIDE 19 OR ABROGATE ANY PROVISIONS OF THE ACT OF MARCH 3, 1978 (P.L.6, 20 NO.3), KNOWN AS THE STEEL PRODUCTS PROCUREMENT ACT. 21 SECTION 27. REPEALS. 22 THE FOLLOWING ACTS AND PARTS OF ACTS ARE REPEALED: 23 SECTIONS 3(13)(I)(B), (V)(A), (XI)(F), (XII)(J) AND 24 (XIII)(A), 4(8)(X)(A) AND 7(1)(XVII)(A) OF THE ACT OF OCTOBER 25 10, 1997 (P.L.392, NO.47), KNOWN AS THE CAPITAL BUDGET PROJECT 26 ITEMIZATION ACT FOR 1996-1997. 27 SECTIONS 3(7)(XX)(C) AND (12)(II)(B) AND 6(9)(VI)(A), 28 (18)(I)(A) AND (23)(III)(A) OF THE ACT OF JUNE 25, 1999 29 (P.L.237, NO.35), KNOWN AS THE CAPITAL BUDGET PROJECT 30 ITEMIZATION ACT FOR 1999-2000. 19990H1023B3629 - 223 -
1 SECTION 28. EDITORIAL CHANGES. 2 IN EDITING AND PREPARING THIS ACT FOR PRINTING FOLLOWING THE 3 FINAL ENACTMENT, THE LEGISLATIVE REFERENCE BUREAU SHALL INSERT 4 OR REVISE LETTERS OR NUMBERS FOR PROJECTS WHERE THE LETTERS OR 5 NUMBERS ARE MISSING OR REQUIRE REVISION. THE BUREAU SHALL ALSO 6 REVISE THE TOTAL MONETARY AMOUNTS FOR THE TOTAL AUTHORIZATION, 7 DEBT AUTHORIZATION, APPROPRIATIONS AND DEPARTMENTAL TOTALS AS 8 NECESSARY TO AGREE WITH THE TOTAL MONETARY AMOUNTS OF THE 9 PROJECTS. 10 SECTION 3. SECTION 3 OF THE ACT IS AMENDED TO READ: 11 SECTION 3. EFFECTIVE DATE. 12 THIS ACT SHALL TAKE EFFECT [JULY 1, 2000, OR IMMEDIATELY, 13 WHICHEVER IS LATER] IMMEDIATELY. B8L72RZ/19990H1023B3629 - 224 -