                                 SENATE AMENDED
        PRIOR PRINTER'S NO. 1131                      PRINTER'S NO. 3629

THE GENERAL ASSEMBLY OF PENNSYLVANIA


HOUSE BILL

No. 1023 Session of 1999


        INTRODUCED BY BARLEY, MARCH 22, 1999

        SENATOR TILGHMAN, APPROPRIATIONS, IN SENATE, RE-REPORTED AS
           AMENDED, JUNE 5, 2000

                                     AN ACT

     1  Providing for the capital budget for the fiscal year 1999-2000.   <--
     2  AMENDING THE ACT OF MAY 22, 2000 (P.L.104, NO.22), ENTITLED "AN   <--
     3     ACT PROVIDING FOR THE CAPITAL BUDGET FOR THE FISCAL YEAR
     4     2000-2001," INCREASING THE CAPITAL BUDGET DEBT AUTHORIZATIONS
     5     AND PROVIDING FOR THE ITEMIZATION OF PUBLIC IMPROVEMENT
     6     PROJECTS, FURNITURE AND EQUIPMENT PROJECTS, TRANSPORTATION
     7     ASSISTANCE PROJECTS, REDEVELOPMENT ASSISTANCE PROJECTS, FLOOD
     8     CONTROL PROJECTS, KEYSTONE RECREATION, PARK AND CONSERVATION
     9     PROJECTS, ENVIRONMENTAL STEWARDSHIP FUND PROJECTS AND PUBLIC
    10     HIGHWAY PROJECTS; AUTHORIZING THE INCURRING OF DEBT WITHOUT
    11     THE APPROVAL OF THE ELECTORS FOR THE PURPOSE OF FINANCING THE
    12     PROJECTS; STATING THE ESTIMATED USEFUL LIFE OF THE PROJECTS;
    13     MAKING APPROPRIATIONS; AND MAKING REPEALS.

    14     The General Assembly of the Commonwealth of Pennsylvania
    15  hereby enacts as follows:
    16  Section 1.  Short title and construction.                         <--
    17     (a)  Short title.--This act shall be known and may be cited
    18  as the Capital Budget Act of 1999-2000.
    19     (b)  Supplements.--A reference to this act shall be deemed to
    20  include a reference to the supplements to this act.
    21     (c)  Capital Facilities Debt Enabling Act.--The provisions
    22  and definitions of Chapter 3 of the act of February 9, 1999

     1  (P.L.1, No.1), known as The Capital Facilities Debt Enabling
     2  Act, shall apply to this act to the extent they are not
     3  inconsistent with this act.
     4  Section 2.  Overall limitations on debt to be incurred for
     5                 capital projects.
     6     The maximum principal amount of additional debt to be
     7  incurred during the 1999-2000 fiscal year, and thereafter until
     8  the enactment of the 2000-2001 capital budget specifying the
     9  maximum debt for the 2000-2001 fiscal year, for capital projects
    10  specifically itemized in a capital budget pursuant to section
    11  7(a)(4) of Article VIII of the Constitution of Pennsylvania, and
    12  the fund to be charged with the repayment of such debt, shall,
    13  with respect to each category of capital projects, be as
    14  follows:
    15                Category              Amount          Fund
    16  (1)  Public Improvement
    17     Projects:
    18     (i)  Buildings and                            General Fund or
    19         Structures               $410,000,000     Special Fund as
    20     (ii)  Furniture and                           applicable
    21         Equipment                  70,000,000
    22  (2)  Transportation
    23     Assistance Projects           150,000,000     General Fund
    24  (3)  Redevelopment
    25     Assistance Projects            280,000,000    General Fund
    26  (4)  Flood Control
    27     Projects                       12,000,000     General Fund
    28     Total                        $922,000,000
    29  Section 3.  Effective date.
    30     This act shall take effect July 1, 1999, or immediately,
    19990H1023B3629                  - 2 -

     1  whichever is later.
     2     SECTION 1.  THE TITLE AND SECTIONS 1 AND 2 OF THE ACT OF MAY   <--
     3  22, 2000 (P.L.104, NO.22), KNOWN AS THE CAPITAL BUDGET ACT OF
     4  2000-2001, ARE AMENDED TO READ:
     5                               AN ACT
     6  PROVIDING FOR THE CAPITAL BUDGET FOR THE FISCAL YEAR 2000-
     7     2001[.], ITEMIZING PUBLIC IMPROVEMENT PROJECTS, FURNITURE AND
     8     EQUIPMENT PROJECTS, TRANSPORTATION ASSISTANCE PROJECTS,
     9     REDEVELOPMENT ASSISTANCE PROJECTS, FLOOD CONTROL PROJECTS,
    10     KEYSTONE RECREATION, PARK AND CONSERVATION PROJECTS,
    11     ENVIRONMENTAL STEWARDSHIP FUND PROJECTS AND PUBLIC HIGHWAY
    12     PROJECTS TO BE CONSTRUCTED OR ACQUIRED OR ASSISTED BY THE
    13     DEPARTMENT OF GENERAL SERVICES, THE DEPARTMENT OF COMMUNITY
    14     AND ECONOMIC DEVELOPMENT, THE DEPARTMENT OF CONSERVATION AND
    15     NATURAL RESOURCES, THE DEPARTMENT OF ENVIRONMENTAL
    16     PROTECTION, THE PENNSYLVANIA FISH AND BOAT COMMISSION, THE
    17     PENNSYLVANIA GAME COMMISSION, AND THE DEPARTMENT OF
    18     TRANSPORTATION, TOGETHER WITH THEIR ESTIMATED FINANCIAL
    19     COSTS; AUTHORIZING THE INCURRING OF DEBT WITHOUT THE APPROVAL
    20     OF THE ELECTORS FOR THE PURPOSE OF FINANCING THE PROJECTS TO
    21     BE CONSTRUCTED OR ACQUIRED OR ASSISTED BY THE DEPARTMENT OF
    22     GENERAL SERVICES, THE DEPARTMENT OF COMMUNITY AND ECONOMIC
    23     DEVELOPMENT, THE DEPARTMENT OF CONSERVATION AND NATURAL
    24     RESOURCES, THE DEPARTMENT OF ENVIRONMENTAL PROTECTION OR THE
    25     DEPARTMENT OF TRANSPORTATION; STATING THE ESTIMATED USEFUL
    26     LIFE OF THE PROJECTS; MAKING APPROPRIATIONS; AND MAKING
    27     REPEALS.
    28  SECTION 1.  SHORT TITLE AND CONSTRUCTION.
    29     (A)  SHORT TITLE.--THIS ACT SHALL BE KNOWN AND MAY BE CITED
    30  AS THE CAPITAL BUDGET DEBT AUTHORIZATION AND PROJECT ITEMIZATION
    19990H1023B3629                  - 3 -

     1  ACT OF 2000-2001.
     2     (B)  SUPPLEMENTS.--A REFERENCE TO THIS ACT SHALL BE DEEMED TO
     3  INCLUDE A REFERENCE TO THE SUPPLEMENTS TO THIS ACT.
     4     (C)  CAPITAL FACILITIES DEBT ENABLING ACT.--THE PROVISIONS
     5  AND DEFINITIONS OF CHAPTER 3 OF THE ACT OF FEBRUARY 9, 1999
     6  (P.L.1, NO.1), KNOWN AS THE CAPITAL FACILITIES DEBT ENABLING
     7  ACT, SHALL APPLY TO THIS ACT TO THE EXTENT THEY ARE NOT
     8  INCONSISTENT WITH THIS ACT.
     9  SECTION 2.  OVERALL LIMITATIONS ON DEBT TO BE INCURRED FOR
    10                 CAPITAL PROJECTS.
    11     THE MAXIMUM PRINCIPAL AMOUNT OF ADDITIONAL DEBT TO BE
    12  INCURRED DURING THE 2000-2001 FISCAL YEAR, AND THEREAFTER UNTIL
    13  THE ENACTMENT OF THE 2001-2002 CAPITAL BUDGET SPECIFYING THE
    14  MAXIMUM DEBT FOR THE 2001-2002 FISCAL YEAR, FOR CAPITAL PROJECTS
    15  SPECIFICALLY ITEMIZED IN A CAPITAL BUDGET PURSUANT TO SECTION
    16  7(A)(4) OF ARTICLE VIII OF THE CONSTITUTION OF PENNSYLVANIA, AND
    17  THE FUND TO BE CHARGED WITH THE REPAYMENT OF SUCH DEBT, SHALL,
    18  WITH RESPECT TO EACH CATEGORY OF CAPITAL PROJECTS, BE AS
    19  FOLLOWS:
    20                CATEGORY              AMOUNT          FUND
    21  (1)  PUBLIC IMPROVEMENT
    22     PROJECTS:
    23     (I)  BUILDINGS AND                            GENERAL FUND OR
    24         [STRUCTURES              $450,000,000     SPECIAL FUND AS
    25     (II)  FURNITURE AND                           APPLICABLE
    26         EQUIPMENT                  70,000,000
    27  (2)  TRANSPORTATION
    28     ASSISTANCE PROJECTS           172,000,000     GENERAL FUND
    29  (3)  REDEVELOPMENT
    30     ASSISTANCE PROJECTS           280,000,000     GENERAL FUND
    19990H1023B3629                  - 4 -

     1  (4)  FLOOD CONTROL
     2     PROJECTS                        7,000,000     GENERAL FUND
     3     TOTAL                        $979,000,000]
     4         STRUCTURES               $600,000,000     SPECIAL FUND AS
     5     (II)  FURNITURE AND                           APPLICABLE
     6         EQUIPMENT                  80,000,000
     7  (2)  TRANSPORTATION
     8     ASSISTANCE PROJECTS           190,000,000     GENERAL FUND
     9  (3)  REDEVELOPMENT
    10     ASSISTANCE PROJECTS           295,000,000     GENERAL FUND
    11  (4)  FLOOD CONTROL
    12     PROJECTS                       14,000,000     GENERAL FUND
    13     TOTAL                      $1,179,000,000
    14     SECTION 2.  THE ACT IS AMENDED BY ADDING SECTIONS TO READ:
    15  SECTION 3.  TOTAL AUTHORIZATIONS.
    16     (A)  PUBLIC IMPROVEMENTS.--THE TOTAL AUTHORIZATION FOR THE
    17  ADDITIONAL CAPITAL PROJECTS IN THE CATEGORY OF PUBLIC
    18  IMPROVEMENT PROJECTS ITEMIZED IN SECTION 4 AND TO BE ACQUIRED OR
    19  CONSTRUCTED BY THE DEPARTMENT OF GENERAL SERVICES, ITS
    20  SUCCESSORS OR ASSIGNS, AND TO BE FINANCED BY THE INCURRING OF
    21  DEBT, SHALL BE $557,240,000.
    22     (B)  FURNITURE AND EQUIPMENT.--THE TOTAL AUTHORIZATION FOR
    23  THE ADDITIONAL CAPITAL PROJECTS IN THE CATEGORY OF PUBLIC
    24  IMPROVEMENT PROJECTS CONSISTING OF THE ACQUISITION OF ORIGINAL
    25  MOVABLE FURNITURE AND EQUIPMENT TO COMPLETE PUBLIC IMPROVEMENT
    26  PROJECTS ITEMIZED IN SECTION 5 AND TO BE ACQUIRED BY THE
    27  DEPARTMENT OF GENERAL SERVICES, ITS SUCCESSORS OR ASSIGNS, AND
    28  TO BE FINANCED BY THE INCURRING OF DEBT, SHALL BE $16,194,000.
    29     (C)  TRANSPORTATION ASSISTANCE.--THE TOTAL AUTHORIZATION FOR
    30  THE CAPITAL PROJECTS IN THE CATEGORY OF TRANSPORTATION
    19990H1023B3629                  - 5 -

     1  ASSISTANCE PROJECTS ITEMIZED IN SECTION 6 WITH RESPECT TO WHICH
     2  AN INTEREST IS TO BE ACQUIRED IN OR CONSTRUCTED BY THE
     3  DEPARTMENT OF TRANSPORTATION, ITS SUCCESSORS OR ASSIGNS, AND TO
     4  BE FINANCED BY THE INCURRING OF DEBT, SHALL BE $561,168,000.
     5     (D)  REDEVELOPMENT ASSISTANCE.--THE TOTAL AUTHORIZATION FOR
     6  THE ADDITIONAL CAPITAL PROJECTS IN THE CATEGORY OF REDEVELOPMENT
     7  ASSISTANCE AND REDEVELOPMENT ASSISTANCE CAPITAL PROJECTS
     8  ITEMIZED IN SECTION 7 FOR CAPITAL GRANTS BY THE DEPARTMENT OF
     9  COMMUNITY AND ECONOMIC DEVELOPMENT, ITS SUCCESSORS OR ASSIGNS,
    10  AND TO BE FINANCED BY THE INCURRING OF DEBT, SHALL BE
    11  $540,413,000.
    12     (E)  FLOOD CONTROL.--THE TOTAL AUTHORIZATION FOR THE CAPITAL
    13  PROJECTS IN THE CATEGORY OF FLOOD CONTROL PROJECTS ITEMIZED IN
    14  SECTION 8 AND TO BE CONSTRUCTED BY THE DEPARTMENT OF
    15  ENVIRONMENTAL PROTECTION, ITS SUCCESSORS OR ASSIGNS, AND TO BE
    16  FINANCED BY THE INCURRING OF DEBT, SHALL BE $7,859,000.
    17     (F)  KEYSTONE RECREATION, PARK AND CONSERVATION.--THE TOTAL
    18  AUTHORIZATION FOR THE CAPITAL PROJECTS IN THE CATEGORY OF
    19  KEYSTONE RECREATION, PARK AND CONSERVATION PROJECTS ITEMIZED IN
    20  SECTION 9 AND TO BE CONSTRUCTED BY THE DEPARTMENT OF
    21  CONSERVATION AND NATURAL RESOURCES, ITS SUCCESSORS OR ASSIGNS,
    22  AND TO BE FINANCED FROM REVENUES IN THE KEYSTONE RECREATION,
    23  PARK AND CONSERVATION FUND SHALL BE $22,820,000.
    24     (G)  ENVIRONMENTAL STEWARDSHIP FUND PROJECTS.--THE TOTAL
    25  AUTHORIZATION FOR THE CAPITAL PROJECTS THE CATEGORY OF
    26  ENVIRONMENTAL STEWARDSHIP PROJECTS ITEMIZED IN SECTION 10 AND TO
    27  BE CONSTRUCTED BY THE DEPARTMENT OF CONSERVATION AND NATURAL
    28  RESOURCES, ITS SUCCESSORS OR ASSIGNS, AND TO BE FINANCED FROM
    29  REVENUES IN THE ENVIRONMENTAL STEWARDSHIP FUND SHALL BE
    30  $64,185,000.
    19990H1023B3629                  - 6 -

     1     (H)  PUBLIC HIGHWAY PROJECTS.--THE TOTAL AUTHORIZATION FOR
     2  THE CAPITAL PROJECTS IN THE CATEGORY OF HIGHWAY PROJECTS
     3  ITEMIZED IN SECTION 11 AND TO BE CONSTRUCTED BY THE DEPARTMENT
     4  OF TRANSPORTATION, ITS SUCCESSORS OR ASSIGNS, AND TO BE FINANCED
     5  BY THE INCURRING OF DEBT, OR FROM CURRENT REVENUES OF THE MOTOR
     6  LICENSE FUND, SHALL BE $2,416,468,000.
     7     (I)  FISH AND BOAT FUND PROJECTS.--THE TOTAL AUTHORIZATION
     8  FOR THE CAPITAL PROJECTS IN THE CATEGORY OF PUBLIC IMPROVEMENT
     9  PROJECTS ITEMIZED IN SECTION 12 TO BE ACQUIRED OR DEVELOPED BY
    10  THE PENNSYLVANIA FISH AND BOAT COMMISSION AND TO BE FINANCED
    11  FROM CURRENT REVENUES OF THE BOAT FUND AND THE FISH FUND
    12  PURSUANT TO EXECUTIVE AUTHORIZATION SHALL BE $1,200,000.
    13     (J)  GAME FUND PROJECTS.--THE TOTAL AUTHORIZATION FOR THE
    14  CAPITAL PROJECTS IN THE CATEGORY OF PUBLIC IMPROVEMENT PROJECTS
    15  ITEMIZED IN SECTION 13 TO BE ACQUIRED BY THE PENNSYLVANIA GAME
    16  COMMISSION, AND TO BE FINANCED FROM CURRENT REVENUES OF THE GAME
    17  FUND PURSUANT TO EXECUTIVE AUTHORIZATIONS, SHALL BE $570,000.
    18     (K)  GENERAL FUND CURRENT REVENUE PROJECTS.--THE TOTAL
    19  AUTHORIZATION FOR THE CAPITAL PROJECTS IN THE CATEGORY OF PUBLIC
    20  IMPROVEMENT PROJECTS ITEMIZED IN SECTION 14 AND TO BE
    21  CONSTRUCTED BY THE DEPARTMENT OF GENERAL SERVICES, ITS
    22  SUCCESSORS OR ASSIGNS, AND TO BE FINANCED FROM CURRENT REVENUES
    23  IN THE GENERAL FUND SHALL BE $14,410,000.
    24     (L)  MOTOR LICENSE FUND CURRENT REVENUE PROJECTS.--THE TOTAL
    25  AUTHORIZATION FOR THE CAPITAL PROJECTS IN THE CATEGORY OF PUBLIC
    26  IMPROVEMENT PROJECTS ITEMIZED IN SECTION 15 AND TO BE
    27  CONSTRUCTED BY THE DEPARTMENT OF GENERAL SERVICES, ITS
    28  SUCCESSORS OR ASSIGNS, AND TO BE FINANCED FROM CURRENT REVENUES
    29  IN THE MOTOR LICENSE FUND SHALL BE $7,500,000.
    30  SECTION 4.  ITEMIZATION OF PUBLIC IMPROVEMENT PROJECTS.
    19990H1023B3629                  - 7 -

     1     ADDITIONAL CAPITAL PROJECTS IN THE CATEGORY OF PUBLIC
     2  IMPROVEMENT PROJECTS TO BE CONSTRUCTED OR ACQUIRED BY THE
     3  DEPARTMENT OF GENERAL SERVICES, ITS SUCCESSORS OR ASSIGNS, AND
     4  TO BE FINANCED BY THE INCURRING OF DEBT, ARE HEREBY ITEMIZED,
     5  TOGETHER WITH THEIR RESPECTIVE ESTIMATED FINANCIAL COSTS, AS
     6  FOLLOWS:
     7                                                           TOTAL  
     8                                                          PROJECT 
     9             PROJECT                                    ALLOCATION
    10  (1)  DEPARTMENT OF CONSERVATION AND NATURAL
    11     RESOURCES
    12     (I)  FOREST DISTRICT 19
    13         (A)  REHABILITATION OF LILY POND DAM              500,000
    14             (BASE PROJECT ALLOCATION - $417,000)
    15             (DESIGN AND CONTINGENCIES - $83,000)
    16     (II)  FORT WASHINGTON STATE PARK
    17         (A)  EXTENSION OF WATER AND SEWER LINES AND
    18             CONSTRUCTION OF MODERN COMFORT
    19             FACILITIES                                  2,500,000
    20             (BASE PROJECT ALLOCATION - $2,075,000)
    21             (DESIGN AND CONTINGENCIES - $425,000)
    22     (III)  LEONARD HARRISON STATE PARK
    23         (A)  DEVELOPMENT OF WATER LINES, SEWER
    24             COLLECTION SYSTEM AND CONSTRUCTION OF
    25             MODERN COMFORT STATIONS                     2,000,000
    26             (BASE PROJECT ALLOCATION - $1,660,000)
    27             (DESIGN AND CONTINGENCIES - $340,000)
    28     (IV)  LYMAN RUN STATE PARK
    29         (A)  REHABILITATION AND CONSTRUCTION OF A
    30             NEW DAM                                    15,000,000
    19990H1023B3629                  - 8 -

     1     (V)  PRINCE GALLITZIN STATE PARK
     2         (A)  PHASE FOUR, MARINA IMPROVEMENTS            1,500,000
     3             (BASE PROJECT ALLOCATION - $1,250,000)
     4             (DESIGN AND CONTINGENCIES - $250,000)
     5     (VI)  SHIKELLAMY STATE PARK
     6         (A)  REHABILITATION OF INFLATABLE DAM           5,000,000
     7             (BASE PROJECT ALLOCATION - $5,000,000)
     8         (B)  CONSTRUCTION OF A FISH PASSAGE AT THE
     9             FABRIDAM IN SUNBURY                         4,200,000
    10             (BASE PROJECT ALLOCATION - $3,850,000)
    11             (DESIGN AND CONTINGENCIES - $350,000)
    12     (VII)  SPROUL STATE FOREST
    13         (A)  ADDITIONAL FUNDS FOR DGS-173-74,
    14             REHABILITATION OF HYNER VIEW ROAD. FOR
    15             THIS ADDITIONAL FUNDS PROJECT AND THE
    16             PROJECT AUTHORIZED IN SECTION
    17             3(3)(VII)(A) OF THE ACT OF JULY 8, 1994
    18             (P.L.444, NO.74), KNOWN AS THE CAPITAL
    19             BUDGET PROJECT ITEMIZATION ACT FOR
    20             1994-95, THE REHABILITATION OF HYNER
    21             VIEW ROAD SHALL INCLUDE WIDENING,
    22             DRAINAGE AND SHOULDER IMPROVEMENTS
    23             ALONG RITCHIE ROAD AND OLD HYNER VIEW
    24             ROAD AND IMPROVEMENTS TO HYNER VIEW
    25             STATE PARK, INCLUDING, BUT NOT LIMITED
    26             TO, THE CONSTRUCTION OF ADA ACCESSIBLE
    27             PARKING, ADA ACCESSIBLE RESTROOM
    28             FACILITIES, THE INSTALLATION OF
    29             APPROPRIATE GUIDE RAILS AND SIGNAGE AND
    30             IMPROVEMENTS TO THE OVERLOOK                  400,000
    19990H1023B3629                  - 9 -

     1         (B)  REHABILITATION OF THE KATO/ORVISTON
     2             ROAD 3.84 MILES                               250,000
     3  (2)  DEPARTMENT OF CORRECTIONS
     4     (I)  STATE CORRECTIONAL INSTITUTION - CAMBRIDGE
     5         SPRINGS
     6         (A)  INSTALL EMERGENCY GENERATOR,
     7             SWITCHGEAR AND PERIMETER LIGHTING           2,000,000
     8             (BASE PROJECT ALLOCATION - $1,600,000)
     9             (DESIGN AND CONTINGENCIES - $400,000)
    10     (II)  STATE CORRECTIONAL INSTITUTION AT CAMP
    11         HILL
    12         (A)  REPLACEMENT OF 12-FOOT FENCE WITH 14-
    13             FOOT FENCE                                  1,000,000
    14     (III)  STATE CORRECTIONAL INSTITUTION - CRESSON
    15         (A)  ELECTRICAL SYSTEM UPGRADES                 4,356,000
    16             (BASE PROJECT ALLOCATION - $3,630,000)
    17             (DESIGN AND CONTINGENCIES - $726,000)
    18     (IV)  STATE CORRECTIONAL INSTITUTION AT DALLAS
    19         (A)  CONSTRUCTION OF A NEW SECURITY FENCE       1,000,000
    20     (V)  STATE CORRECTIONAL INSTITUTION -
    21         GRATERFORD
    22         (A)  SECURITY UPGRADES                         13,020,000
    23             (BASE PROJECT ALLOCATION - $10,850,000)
    24             (DESIGN AND CONTINGENCIES - $2,170,000)
    25         (B)  CONSTRUCTION OF A 148-BED HOUSING
    26             UNIT                                        6,720,000
    27             (BASE PROJECT ALLOCATION - $5,600,000)
    28             (DESIGN AND CONTINGENCIES - $1,120,000)
    29     (VI)  STATE CORRECTIONAL INSTITUTION -
    30         HUNTINGDON
    19990H1023B3629                 - 10 -

     1         (A)  REPOINT AND SEAL PERIMETER BRICK WALL        773,000
     2             (BASE PROJECT ALLOCATION - $644,000)
     3             (DESIGN AND CONTINGENCIES - $129,000)
     4         (B)  CONSTRUCTION OF A 148-BED HOUSING
     5             UNIT                                        6,720,000
     6             (BASE PROJECT ALLOCATION - $5,600,000)
     7             (DESIGN AND CONTINGENCIES - $1,120,000)
     8     (VII)  STATE REGIONAL CORRECTIONAL FACILITY -
     9         MERCER
    10         (A)  ELECTRICAL SYSTEM UPGRADES                 3,226,000
    11             (BASE PROJECT ALLOCATION - $2,688,000)
    12             (DESIGN AND CONTINGENCIES - $538,000)
    13     (VIII)  STATE CORRECTIONAL INSTITUTION AT MUNCY
    14         (A)  CONSTRUCTION OF A NEW SECOND SECURITY
    15             FENCE                                         949,000
    16     (IX)  STATE CORRECTIONAL INSTITUTION -
    17         PITTSBURGH
    18         (A)  RECONSTRUCT AND STABILIZE PERIMETER
    19             WALL                                        1,201,000
    20             (BASE PROJECT ALLOCATION - $1,001,000)
    21             (DESIGN AND CONTINGENCIES - $200,000)
    22     (X)  STATE CORRECTIONAL INSTITUTION - ROCKVIEW
    23         (A)  CONSTRUCTION OF AN ADDITION TO THE
    24             RESTRICTED HOUSING UNIT                     4,032,000
    25             (BASE PROJECT ALLOCATION - $3,360,000)
    26             (DESIGN AND CONTINGENCIES - $672,000)
    27         (B)  NEW BOILER AND BOILER HOUSE
    28             RENOVATIONS                                 1,478,000
    29             (BASE PROJECT ALLOCATION - $1,232,000)
    30             (DESIGN AND CONTINGENCIES - $246,000)
    19990H1023B3629                 - 11 -

     1     (XI)  STATE CORRECTIONAL INSTITUTION AT WAYMART
     2         (A)  CONSTRUCTION OF A NEW SECOND SECURITY
     3             FENCE                                         600,000
     4         (B)  REPLACEMENT OF SEWAGE TREATMENT PLANT
     5             AND EXPANSION OF COLLECTION SYSTEM          3,695,000
     6             (BASE PROJECT ALLOCATION - $3,079,000)
     7             (DESIGN AND CONTINGENCIES - $616,000)
     8  (3)  DEPARTMENT OF EDUCATION
     9     (I)  THADDEUS STEVENS COLLEGE OF TECHNOLOGY
    10         (A)  ADDITIONAL FUNDS FOR DGS PROJECT 417-
    11             31, RENOVATION OF FIRE TOWERS AT
    12             BRENNER HALL                                  500,000
    13             (BASE PROJECT ALLOCATION - $417,000)
    14             (DESIGN AND CONTINGENCIES - $83,000)
    15     (II)  LINCOLN UNIVERSITY
    16         (A)  COMMUNICATIONS AND ELECTRICAL
    17             DISTRIBUTION SYSTEM REPLACEMENT             3,000,000
    18             (BASE PROJECT ALLOCATION - $2,400,000)
    19             (DESIGN AND CONTINGENCIES - $600,000)
    20         (B)  ADDITIONAL FUNDS FOR DGS PROJECT 1101-
    21             24 FIRE ALARM AND SECURITY                    750,000
    22         (C)  ADDITIONAL FUNDS FOR DGS PROJECT 1101-
    23             25 STORM WATER DRAINAGE SYSTEM                416,000
    24         (D)  ADDITIONAL FUNDS FOR BOILER PLANT AND
    25             STEAM DISTRIBUTION                          3,150,000
    26         (E)  ADDITIONAL FUNDS FOR RENOVATION OF
    27             UNIVERSITY HALL - UPGRADE OF BUILDING
    28             SYSTEMS                                       500,000
    29         (F)  COMMUNICATIONS INFRASTRUCTURE              2,000,000
    30             (BASE PROJECT ALLOCATION - $1,666,000)
    19990H1023B3629                 - 12 -

     1             (DESIGN AND CONTINGENCIES - $334,000)
     2         (G)  CAMPUS LIGHTING                            2,049,000
     3             (BASE PROJECT ALLOCATION - $1,707,000)
     4             (DESIGN AND CONTINGENCIES - $342,000)
     5         (H)  UPGRADE/REPLACEMENT OF WATER TREATMENT
     6             PLANT                                       1,000,000
     7             (BASE PROJECT ALLOCATION - $833,000)
     8             (DESIGN AND CONTINGENCIES - $167,000)
     9         (I)  HVAC SYSTEM AND CONTROLS IN ACADEMIC
    10             AND ADMINISTRATIVE BUILDINGS                2,000,000
    11             (BASE PROJECT ALLOCATION - $1,666,000)
    12             (DESIGN AND CONTINGENCIES - $334,000)
    13         (J)  STEAM BOILER REPLACEMENT                   1,000,000
    14             (BASE PROJECT ALLOCATION - $833,000)
    15             (DESIGN AND CONTINGENCIES - $167,000)
    16         (K)  WATER TOWER UPGRADE                          750,000
    17             (BASE PROJECT ALLOCATION - $625,000)
    18             (DESIGN AND CONTINGENCIES - $125,000)
    19         (L)  WATER DISTRIBUTION SYSTEM UPGRADE          5,000,000
    20             (BASE PROJECT ALLOCATION - $4,166,000)
    21             (DESIGN AND CONTINGENCIES - $834,000)
    22         (M)  ASBESTOS ABATEMENT                         1,000,000
    23             (BASE PROJECT ALLOCATION - $833,000)
    24             (DESIGN AND CONTINGENCIES - $167,000)
    25         (N)  ROOF UPGRADES FOR RESIDENCE HALLS AND
    26             ACADEMIC BUILDINGS                          1,200,000
    27             (BASE PROJECT ALLOCATION - $1,000,000)
    28             (DESIGN AND CONTINGENCIES - $200,000)
    29         (O)  LIVING AND LEARNING CENTER HOT WATER
    30             DISTRIBUTION                                1,000,000
    19990H1023B3629                 - 13 -

     1             (BASE PROJECT ALLOCATION - $833,000)
     2             (DESIGN AND CONTINGENCIES - $167,000)
     3         (P)  LIFE SCIENCE VENTILATION UPGRADES TO
     4             LABORATORY AREAS                            6,500,000
     5             (BASE PROJECT ALLOCATION - $5,416,000)
     6             (DESIGN AND CONTINGENCIES - $1,084,000)
     7         (Q)  RENOVATION OF THE WARE CENTER USED FOR
     8             THEATER ARTS                                3,500,000
     9             (BASE PROJECT ALLOCATION - $2,916,000)
    10             (DESIGN AND CONTINGENCIES - $584,000)
    11         (R)  RENOVATION OF WRITE HALL CLASSROOMS
    12             AND LABORATORIES                            6,000,000
    13             (BASE PROJECT ALLOCATION - $5,000,000)
    14             (DESIGN AND CONTINGENCIES - $1,000,000)
    15         (S)  RENOVATION OF MANUEL RIFERO HALL FOR
    16             PHYSICAL EDUCATION AND ATHLETICS
    17             PROGRAMS                                   14,500,000
    18             (BASE PROJECT ALLOCATION - $12,083,000)
    19             (DESIGN AND CONTINGENCIES - $2,417,000)
    20     (III)  THE PENNSYLVANIA STATE UNIVERSITY
    21         (A)  CAPITAL RENEWAL AT UNIVERSITY PARK
    22             CAMPUS                                     20,000,000
    23             (BASE PROJECT ALLOCATION - $20,000,000)
    24     (IV)  TEMPLE UNIVERSITY
    25         (A)  RENOVATION OF BARTON HALL                  6,800,000
    26             (BASE PROJECT ALLOCATION - $5,667,000)
    27             (DESIGN AND CONTINGENCIES - $1,133,000)
    28  (4)  EMERGENCY MANAGEMENT AGENCY
    29     (I)  SUPPORT FACILITIES AT STATE FIRE ACADEMY
    30         (A)  RECONSTRUCT AND UPGRADE SUPPORT
    19990H1023B3629                 - 14 -

     1             FACILITIES AT THE STATE FIRE ACADEMY        2,760,000
     2             (BASE PROJECT ALLOCATION - $2,300,000)
     3             (DESIGN AND CONTINGENCIES - $460,000)
     4  (5)  DEPARTMENT OF ENVIRONMENTAL PROTECTION
     5     (I)  ALLEGHENY COUNTY
     6         (A)  ADDITIONAL FUNDS FOR LONG RUN
     7             WATERSHED PROJECT IN MCKEESPORT               250,000
     8     (II)  LANCASTER COUNTY
     9         (A)  BOROUGH OF MARIETTA FLOOD PROTECTION
    10             PROJECT                                     3,120,000
    11             (BASE PROJECT ALLOCATION - $2,600,000)
    12             (DESIGN AND CONTINGENCIES - $520,000)
    13     (III)  ASHLEY BOROUGH, LUZERNE COUNTY
    14         (A)  INSTALLATION OF RECTANGULAR CONCRETE
    15             CHANNEL ON SULFUR RUN                       2,520,000
    16             (BASE PROJECT ALLOCATION - $2,100,000)
    17             (DESIGN AND CONTINGENCIES - $420,000)
    18     (IV)  DUPONT, AVOCA AND DURYEA BOROUGHS,
    19         LUZERNE COUNTY
    20         (A)  ADDITIONAL FUNDS FOR DGS PROJECT 184-
    21             23 CONSTRUCTION OF CONCRETE CHANNEL FOR
    22             MILL CREEK AND TRIBUTARIES                  1,200,000
    23             (BASE PROJECT ALLOCATION - $1,000,000)
    24             (DESIGN AND CONTINGENCIES - $200,000)
    25     (V)  SCHUYLKILL COUNTY
    26         (A)  RECONSTRUCTION OF THE ABUTMENTS FOR
    27             AUBURN DAM, SCHUYLKILL RIVER                  180,000
    28             (BASE PROJECT ALLOCATION - $150,000)
    29             (DESIGN AND CONTINGENCIES - $30,000)
    30  (6)  DEPARTMENT OF GENERAL SERVICES
    19990H1023B3629                 - 15 -

     1     (I)  CAPITOL AREA BUILDINGS
     2         (A)  RENOVATIONS TO THE ARSENAL AND TENT
     3             BUILDINGS AT THE PUBLIC WORKS COMPLEX       2,868,000
     4             (BASE PROJECT ALLOCATION - $2,390,000)
     5             (DESIGN AND CONTINGENCIES - $478,000)
     6         (B)  CONSTRUCTION OF THE COMMONWEALTH MAIL
     7             PROCESSING AND LEGISLATIVE SERVICES
     8             FACILITY                                    5,000,000
     9     (II)  CAPITOL COMPLEX
    10         (A)  CONNECT THE FINANCE AND FORUM
    11             BUILDINGS TO CENTRAL REFRIGERATION
    12             PLANT                                      12,000,000
    13             (BASE PROJECT ALLOCATION - $10,000,000)
    14             (DESIGN AND CONTINGENCIES - $2,000,000)
    15         (B)  REPLACEMENT OF ROOF AND RAIN LEADERS
    16             AND RECONSTRUCT PARAPET ON SOUTH OFFICE
    17             BUILDING                                    1,800,000
    18             (BASE PROJECT ALLOCATION - $1,500,000)
    19             (DESIGN AND CONTINGENCIES - $300,000)
    20         (C)  FOUNDATION WATERPROOFING OF HEALTH AND
    21             WELFARE BUILDING                              600,000
    22             (BASE PROJECT ALLOCATION - $500,000)
    23             DESIGN AND CONTINGENCIES - $100,000)
    24         (D)  ADDITIONAL FUNDS FOR DGS 948-53,
    25             REPAIR AND RENOVATION OF THE CAPITOL
    26             COMPLEX. IN ADDITION TO MISCELLANEOUS
    27             RENOVATIONS AND REPAIRS WITHIN THE
    28             CAPITOL COMPLEX THIS PROJECT SHALL BE
    29             FOR IMPROVEMENTS AND REPAIRS TO
    30             FACILITIES IN THE CAPITOL COMPLEX TO
    19990H1023B3629                 - 16 -

     1             ENHANCE PERIMETER AND EXTERIOR SECURITY
     2             AND SAFETY, UPGRADE SERVICES TO THE
     3             FACILITIES, AND OTHER CODE IMPROVEMENTS
     4             AND RENOVATIONS TO ENHANCE FACILITY
     5             OPERATIONS                                 30,000,000
     6             (BASE PROJECT ALLOCATION - $26,000,000)
     7             (DESIGN AND CONTINGENCIES - $4,000,000)
     8         (E)  ADDITIONAL FUNDS FOR DGS-948-35, FIRE
     9             SAFETY CODE IMPROVEMENTS. IN ADDITION
    10             TO FIRE SAFETY CODE IMPROVEMENTS AND
    11             MISCELLANEOUS RENOVATIONS AND REPAIRS
    12             FOR THE CAPITOL BUILDING, NORTH OFFICE
    13             BUILDING AND THE SOUTH OFFICE BUILDING,
    14             THIS PROJECT SHALL BE FOR IMPROVEMENTS
    15             AND REPAIRS TO UPGRADE SERVICES TO THE
    16             FACILITIES AND OTHER CODE IMPROVEMENTS
    17             OR RENOVATIONS TO ENHANCE FACILITY
    18             OPERATIONS                                 10,000,000
    19     (III)  LIEUTENANT GOVERNOR'S RESIDENCE
    20         (A)  UPGRADES TO THE SMOKE DETECTION, FIRE
    21             ALARM AND SECURITY SYSTEMS                    480,000
    22             (BASE PROJECT ALLOCATION - $400,000)
    23             (DESIGN AND CONTINGENCIES - $80,000)
    24  (7)  HISTORICAL AND MUSEUM COMMISSION
    25     (I)  DANIEL BOONE HOMESTEAD
    26         (A)  CONSTRUCT PERMANENT EXHIBITS                 720,000
    27             (BASE PROJECT ALLOCATION - $600,000)
    28             (DESIGN AND CONTINGENCIES - $120,000)
    29     (II)  OLD ECONOMY VILLAGE
    30         (A)  SITE IMPROVEMENTS AND MECHANICAL
    19990H1023B3629                 - 17 -

     1             BUILDING SYSTEMS UPGRADES                   1,200,000
     2             (BASE PROJECT ALLOCATION - $1,000,000)
     3             (DESIGN AND CONTINGENCIES - $200,000)
     4  (8)  DEPARTMENT OF MILITARY AND VETERANS AFFAIRS
     5     (I)  SCOTLAND SCHOOL FOR VETERANS' CHILDREN,
     6         FRANKLIN COUNTY
     7         (A)  RENOVATION OF MAIN SCHOOL BUILDING AND
     8             NINE COTTAGES                               4,102,000
     9             (BASE PROJECT ALLOCATION - $3,418,000)
    10             (DESIGN AND CONTINGENCIES - $684,000)
    11     (II)  PENNSYLVANIA NATIONAL GUARD ARMORY,
    12         BOROUGH OF MEDIA
    13         (A)  ACQUISITION OF SITE AND RENOVATIONS TO
    14             THE BALTIMORE PIKE SITE                     1,200,000
    15     (III)  PENNSYLVANIA NATIONAL GUARD ARMORY,
    16         MERCER COUNTY
    17         (A)  CONSTRUCTION AND LAND ACQUISITION FOR
    18             A NEW ARMORY                                1,300,000
    19             (BASE PROJECT ALLOCATION - $1,000,000)
    20             (LAND ALLOCATION - $100,000)
    21             (DESIGN AND CONTINGENCIES - $200,000)
    22  (9)  DEPARTMENT OF PUBLIC WELFARE
    23     (I)  HARRISBURG STATE HOSPITAL
    24         (A)  IMPROVEMENTS TO ELECTRICAL
    25             DISTRIBUTION SYSTEM IN BUILDING NOS.
    26             11, 15, 32 AND 53                             900,000
    27             (BASE PROJECT ALLOCATION - $750,000)
    28             (DESIGN AND CONTINGENCIES - $150,000)
    29     (II)  NORRISTOWN STATE HOSPITAL
    30         (A)  INSTALL SECURITY FENCE AND AIR
    19990H1023B3629                 - 18 -

     1             CONDITIONING AT FORENSIC UNIT               2,880,000
     2             (BASE PROJECT ALLOCATION - $2,400,000)
     3             (DESIGN AND CONTINGENCIES - $480,000)
     4         (B)  ADDITIONAL FUNDS FOR DGS-509-26, AIR
     5             CONDITIONING OF PATIENT BUILDING NO.12        500,000
     6             (BASE PROJECT ALLOCATION - $500,000)
     7     (III)  EBENSBURG CENTER
     8         (A)  PRIMARY ELECTRICAL UPGRADE                 1,152,000
     9             (BASE PROJECT ALLOCATION - $960,000)
    10             (DESIGN AND CONTINGENCIES - $192,000)
    11     (IV)  SOUTHWEST SECURE TREATMENT UNIT
    12         (A)  RENOVATION OF HVAC SYSTEMS IN THE
    13             WISEMAN BUILDING                            1,680,000
    14             (BASE PROJECT ALLOCATION - $1,400,000)
    15             (DESIGN AND CONTINGENCIES - $280,000)
    16  (10)  PENNSYLVANIA STATE POLICE
    17     (I)  HOLLIDAYSBURG HEADQUARTERS
    18         (A)  ADDITIONAL FUNDS FOR DGS PROJECT 201-
    19             3, CONSTRUCTION OF A NEW HEADQUARTERS
    20             BUILDING                                    2,400,000
    21             (BASE PROJECT ALLOCATION - $2,000,000)
    22             (DESIGN AND CONTINGENCIES - $400,000)
    23     (II)  FIREARMS TRAINING CENTER IN MONTGOMERY
    24         COUNTY
    25         (A)  LAND ACQUISITION, DESIGN AND
    26             CONSTRUCTION OF AN INDOOR FIREARMS
    27             TRAINING CENTER                             5,000,000
    28  (11)  DEPARTMENT OF TRANSPORTATION
    29     (I)  FORT PITT TUNNEL MAINTENANCE FACILITY
    30         (A)  CONSTRUCT OR ACQUIRE A REPLACEMENT
    19990H1023B3629                 - 19 -

     1             MAINTENANCE FACILITY                        1,850,000
     2             (BASE PROJECT ALLOCATION - $1,250,000)
     3             (LAND ALLOCATION - $500,000)
     4             (DESIGN AND CONTINGENCIES - $100,000)
     5     (II)  HIGHWAY SIGN PRODUCTION/DISTRIBUTION
     6         FACILITY
     7         (A)  REPLACE SIGN PRODUCTION/DISTRIBUTION
     8             FACILITY                                    3,080,000
     9             (BASE PROJECT ALLOCATION - $2,600,000)
    10             (LAND ALLOCATION - $200,000)
    11             (DESIGN AND CONTINGENCIES - $280,000)
    12     (III)  ALLEGHENY COUNTY
    13         (A)  PRECONSTRUCTION AND CONSTRUCTION OF A
    14             DOWNTOWN URBAN SHUTTLE SYSTEM IN THE
    15             CITY OF PITTSBURGH USING LOW-SPEED
    16             SUPERCONDUCTIVE MAGLEV TECHNOLOGY.
    17             FUNDS WILL BE USED TO MATCH FEDERAL
    18             FUNDS CONTAINED IN THE TRANSPORTATION
    19             EQUITY ACT FOR THE 21ST CENTURY, AS
    20             AMENDED PROVIDING FOR THE DEVELOPMENT
    21             AND CONSTRUCTION OF A LOW-SPEED MAGLEV
    22             SYSTEM IN THE CITY OF PITTSBURGH            1,375,000
    23     (IV)  MONROE COUNTY
    24         (A)  ADDITIONAL FUNDS FOR DGS-657-  ,
    25             DELAWARE WATER GAP WELCOME CENTER,
    26             INTERSTATE 80                               3,000,000
    27  (12)  STATE SYSTEM OF HIGHER EDUCATION
    28     (I)  BLOOMSBURG UNIVERSITY
    29         (A)  ADDITION TO SUTLIFF HALL                   7,800,000
    30         (B)  RENOVATION OF NAVY HALL                    4,710,000
    19990H1023B3629                 - 20 -

     1     (II)  CALIFORNIA UNIVERSITY
     2         (A)  PEDESTRIAN AND VEHICLE ENHANCEMENT,
     3             PHASE II                                    7,940,000
     4         (B)  CONSTRUCTION OF A CONVOCATION -
     5             ATHLETIC - RECREATION CENTER               16,413,000
     6     (III)  CHEYNEY UNIVERSITY
     7         (A)  DEMOLITION OF EVANGELINE RACHEL HALL
     8             EDUCATION BUILDING AND WATER TOWER         2,000,000
     9             (BASE PROJECT ALLOCATION - $1,667,000)
    10             (DESIGN AND CONTINGENCIES - $333,000)
    11         (B)  RENOVATION OF ENTRANCE AND ACCESS
    12             ROADWAYS/LOTS                               2,800,000
    13         (C)  RENOVATION OF HARRIS-TURNER CENTER         3,995,000
    14         (D)  RENOVATION OF MARIAN ANDERSON MUSIC
    15             BUILDING                                    5,600,000
    16         (E)  RENOVATION OF COPE HALL                    4,995,000
    17         (F)  RENOVATION OF ELLIS POWER PLANT            8,995,000
    18         (G)  RENOVATION OF JONES-HILTON BUILDING        2,890,000
    19         (H)  RENOVATION OF WADE WILSON BUILDING         4,500,000
    20         (I)  ADDITIONAL FUNDS FOR DGS 403-66,
    21             RENOVATION OF BIDDLE HALL                     700,000
    22     (IV)  CLARION UNIVERSITY
    23         (A)  REPAIR BY REPLACEMENT, PEIRCE SCIENCE
    24             CENTER                                     27,146,000
    25     (V)  EAST STROUDSBURG UNIVERSITY
    26         (A)  LAND ACQUISITION FOR EXPANSION OF
    27             CAMPUS                                      1,850,000
    28         (B)  RENOVATION OF ROSENKRANS HALL              3,875,000
    29     (VI)  EDINBORO UNIVERSITY
    30         (A)  RENOVATION OF HAMILTON HALL                5,550,000
    19990H1023B3629                 - 21 -

     1         (B)  RENOVATION OF SOX HARRISON STADIUM           996,000
     2         (C)  RENOVATION OF LEADER CLINIC                  760,000
     3         (D)  RENOVATION/REPLACEMENT OF WHITE HALL         990,000
     4     (VII)  INDIANA UNIVERSITY
     5         (A)  ADDITION TO/RENOVATION OF FISHER
     6             AUDITORIUM                                  9,354,000
     7         (B)  RENOVATION OF WILSON HALL                  2,749,000
     8         (C)  ADDITION TO/RENOVATION OF ACKERMAN
     9             HALL                                        5,526,000
    10         (D)  RENOVATION OF STEAM DISTRIBUTION AND
    11             TUNNELS                                     1,590,000
    12         (E)  UPGRADE OF ELECTRICAL DISTRIBUTION
    13             SYSTEM                                      1,921,000
    14         (F)  RENOVATION OF BOILER PLANT                 3,288,000
    15     (VIII)  KUTZTOWN UNIVERSITY
    16         (A)  RENOVATION OF OLD MAIN, PHASE IV           5,176,000
    17         (B)  LIFE CYCLE RENOVATION OF DEFRANCESCO
    18             BUILDING                                    4,940,000
    19     (IX)  LOCK HAVEN UNIVERSITY
    20         (A)  RENOVATION OF RAUB HALL                    4,896,000
    21         (B)  CONSTRUCTION OF INDOOR ATHLETIC
    22             FACILITY - CLEARFIELD                       7,975,000
    23     (X)  MANSFIELD UNIVERSITY
    24         (A)  RENOVATION OF MEMORIAL HALL                1,462,000
    25         (B)  RENOVATION OF DECKER GYMNASIUM             6,480,000
    26         (C)  RENOVATION OF VAN NORMAN ATHLETIC
    27             COMPLEX                                     4,156,000
    28     (XI)  MILLERSVILLE UNIVERSITY
    29         (A)  ADDITION TO EDUCATION BUILDING             3,418,000
    30         (B)  LIFE CYCLE RENOVATION OF BROOKS HALL       4,544,000
    19990H1023B3629                 - 22 -

     1         (C)  LIFE CYCLE RENOVATION OF WITMER HALL       2,062,000
     2         (D)  RENOVATION OF OSBURN HALL                  4,198,000
     3     (XII)  SHIPPENSBURG UNIVERSITY
     4         (A)  MODERNIZE CAMPUS STEAM PLANT               6,660,000
     5         (B)  RENOVATION OF ROWLAND AND SHEARER
     6             HALLS                                       5,167,000
     7     (XIII)  SLIPPERY ROCK UNIVERSITY
     8         (A)  RENOVATION OF EISENBERG CLASSROOM
     9             BUILDING                                    6,300,000
    10         (B)  RENOVATION OF MALTBY AND LOWRY
    11             BUILDING                                    3,300,000
    12         (C)  RENOVATION OF MCKAY EDUCATION
    13             BUILDING                                    3,360,000
    14         (D)  REPLACEMENT OF VINCENT SCIENCE
    15             BUILDING                                   14,442,000
    16     (XIV)  WEST CHESTER UNIVERSITY
    17         (A)  CONSTRUCTION OF CLASSROOM BUILDING,
    18         PHASE II                                       25,216,000
    19         (B)  LAND ACQUISITION FOR CAMPUS EXPANSION     10,600,000
    20         (C)  RESTORE/EXPAND GLENN ECHO CONFERENCE
    21             CENTER                                      2,016,000
    22         (D)  RENOVATION OF FHG LIBRARY                 18,546,000
    23         (E)  CONSTRUCTION OF STUDENT HEALTH CENTER      3,541,000
    24  SECTION 5.  ITEMIZATION OF FURNITURE AND EQUIPMENT PROJECTS.
    25     ADDITIONAL CAPITAL PROJECTS IN THE CATEGORY OF PUBLIC
    26  IMPROVEMENT PROJECTS CONSISTING OF THE ACQUISITION OF MOVABLE
    27  FURNITURE AND EQUIPMENT TO COMPLETE PUBLIC IMPROVEMENT PROJECTS
    28  AND TO BE PURCHASED BY THE DEPARTMENT OF GENERAL SERVICES, ITS
    29  SUCCESSORS OR ASSIGNS, AND TO BE FINANCED BY THE INCURRING OF
    30  DEBT, ARE HEREBY ITEMIZED, TOGETHER WITH THEIR RESPECTIVE
    19990H1023B3629                 - 23 -

     1  ESTIMATED FINANCIAL COSTS, AS FOLLOWS:
     2                                                           TOTAL  
     3                                                          PROJECT 
     4             PROJECT                                    ALLOCATION
     5  (1)  DEPARTMENT OF CONSERVATION AND NATURAL
     6     RESOURCES
     7     (I)  GREENWOOD FURNACE STATE PARK
     8         (A)  FURNITURE AND EQUIPMENT FOR DGS
     9             PROJECT 129-1, IMPROVEMENTS TO PICNIC
    10             AND CAMPING FACILITIES                         90,000
    11             (BASE PROJECT ALLOCATION - $90,000)
    12         (B)  FURNITURE AND EQUIPMENT FOR DGS
    13             PROJECT 129-2, REHABILITATE PARK
    14             ADMINISTRATION AND SUPPORT FACILITIES          90,000
    15             (BASE PROJECT ALLOCATION - $90,000)
    16     (II)  PYMATUNING STATE PARK
    17         (A)  FURNITURE AND EQUIPMENT FOR DGS
    18             PROJECT 103-4, REHABILITATION OF THE
    19             LINEVILLE BOAT LIVERY                         100,000
    20             (BASE PROJECT ALLOCATION - $100,000)
    21  (2)  DEPARTMENT OF EDUCATION
    22     (I)  LINCOLN UNIVERSITY
    23         (A)  NEW FURNITURE AND EQUIPMENT FOR DGS-
    24             1101-23, INTERNATIONAL CULTURAL CENTER      3,100,000
    25  (3)  DEPARTMENT OF GENERAL SERVICES
    26     (I)  CAPITOL AREA BUILDINGS
    27         (A)  FURNITURE AND EQUIPMENT FOR
    28             COMMONWEALTH MAIL PROCESSING AND
    29             LEGISLATIVE SERVICES FACILITY               8,000,000
    30  (4)  STATE SYSTEM OF HIGHER EDUCATION
    19990H1023B3629                 - 24 -

     1     (I)  CHEYNEY UNIVERSITY
     2         (A)  FURNITURE AND EQUIPMENT FOR DGS
     3             PROJECT TO RENOVATE MELROSE HOSPITALITY
     4             CENTER                                         30,000
     5             (BASE PROJECT ALLOCATION - $30,000)
     6         (B)  FURNITURE AND EQUIPMENT FOR DGS
     7             PROJECT TO RENOVATE THE ADA GEORGES
     8             DINING HALL                                    65,000
     9             (BASE PROJECT ALLOCATION - $65,000)
    10         (C)  FURNITURE AND EQUIPMENT TO RENOVATE
    11             HALL EDUCATION CENTER                         660,000
    12         (D)  FURNITURE AND EQUIPMENT TO RENOVATE
    13             VAUX/LIGAN                                    639,000
    14     (II)  EAST STROUDSBURG UNIVERSITY
    15         (A)  FURNITURE AND EQUIPMENT FOR FINE AND
    16             PERFORMING ARTS CENTER                        108,000
    17     (III)  EDINBORO UNIVERSITY
    18         (A)  FURNITURE AND EQUIPMENT FOR DGS-406-
    19             39, AUDITORIUM                                400,000
    20     (IV)  LOCK HAVEN UNIVERSITY
    21         (A)  FURNITURE AND EQUIPMENT FOR DGS-409-56
    22             FOR CLEARFIELD CAMPUS                         500,000
    23     (V)  MANSFIELD UNIVERSITY
    24         (A)  FURNITURE AND EQUIPMENT FOR GRANT
    25             SCIENCE HALL                                  996,000
    26         (B)  FURNITURE AND EQUIPMENT FOR HOME
    27             ECONOMICS BUILDING                            420,000
    28     (VI)  MILLERSVILLE UNIVERSITY
    29         (A)  ORIGINAL FURNITURE AND EQUIPMENT
    30             MCCOMSEY HALL                                 766,000
    19990H1023B3629                 - 25 -

     1     (VII)  SLIPPERY ROCK UNIVERSITY
     2         (A)  FURNITURE AND EQUIPMENT FOR WEST HALL        230,000
     3  SECTION 6.  ITEMIZATION OF TRANSPORTATION ASSISTANCE PROJECTS.
     4     (A)  MASS TRANSIT.--ADDITIONAL CAPITAL PROJECTS IN THE
     5  CATEGORY OF TRANSPORTATION ASSISTANCE PROJECTS FOR MASS TRANSIT
     6  IN WHICH AN INTEREST IS TO BE ACQUIRED OR CONSTRUCTED BY THE
     7  DEPARTMENT OF TRANSPORTATION, ITS SUCCESSORS OR ASSIGNS, AND TO
     8  BE FINANCED BY THE INCURRING OF DEBT, ARE HEREBY ITEMIZED,
     9  TOGETHER WITH THEIR ESTIMATED FINANCIAL COSTS, AS FOLLOWS:
    10                                                           TOTAL  
    11                                                          PROJECT 
    12             PROJECT                                    ALLOCATION
    13  (1)  BERKS AND READING TRANSPORTATION AUTHORITY
    14     (I)  FFY 1999 SECTION 3 ACQUISITION OF 15
    15         REPLACEMENT TRANSIT BUSES                         833,000
    16             (BASE PROJECT ALLOCATION - $833,000)
    17     (II)  FFY 1999 SECTION 9 ACQUISITION OF 10
    18         PARATRANSIT VEHICLES                              416,000
    19             (BASE PROJECT ALLOCATION - $416,000)
    20     (III)  FFY 2000 SECTION 3 ACQUISITION OF 16
    21         TRANSIT BUSES                                   1,000,000
    22             (BASE PROJECT ALLOCATION - $1,000,000)
    23     (IV)  FFY 1999 SECTION 9 ACQUISITION OF 10
    24         PARATRANSIT VEHICLES                              500,000
    25             (BASE PROJECT ALLOCATION - $500,000)
    26     (V)  DOWNTOWN INTERMODAL FACILITY, PHASE II           500,000
    27             (BASE PROJECT ALLOCATION -$500,000)
    28  (2)  BEAVER COUNTY TRANSIT AUTHORITY
    29     (I)  CONSTRUCTION OF AN EXPRESSWAY TRAVEL
    30         CENTER                                            563,000
    19990H1023B3629                 - 26 -

     1             (BASE PROJECT ALLOCATION - $563,000)
     2     (II)  INSTALLATION OF MOBILITY MANAGER
     3         TECHNOLOGY                                        200,000
     4             (BASE PROJECT ALLOCATION - $200,000)
     5     (III)  ACQUISITION AND DEVELOPMENT OF FORMER K-
     6         MART STORE SITE AND CONSTRUCTION OF A FLEET
     7         MAINTENANCE CENTER                              1,000,000
     8  (3)  CENTRE AREA TRANSIT AUTHORITY
     9     (I)  INTERMODAL TRANSIT CENTER                        833,000
    10             (BASE PROJECT ALLOCATION - $833,000)
    11     (II)  EXPANSION OF ADMINISTRATIVE AND
    12         OPERATIONS OFFICES                                 83,000
    13             (BASE PROJECT ALLOCATION - $83,000)
    14     (III)  PARK-N-RIDE LOTS                               100,000
    15             (BASE PROJECT ALLOCATION - $100,000)
    16  (4)  CAMBRIA COUNTY TRANSIT AUTHORITY
    17     (I)  SATELLITE OPERATIONS AND MAINTENANCE
    18         FACILITY                                          133,000
    19             (BASE PROJECT ALLOCATION - $133,000)
    20  (5)  LACKAWANNA COUNTY TRANSIT SYSTEM
    21     (I)  DOWNTOWN INTERMODAL TRANSIT FACILITY             208,000
    22             (BASE PROJECT ALLOCATION - $208,000)
    23  (6)  ERIE METROPOLITAN TRANSIT AUTHORITY
    24     (I)  COMPRESSED NATURAL GAS (CNG) BUS
    25         ACQUISITION                                       340,000
    26             (BASE PROJECT ALLOCATION - $340,000)
    27     (II)  FFY 1999 TRANSIT BUS ACQUISITION                325,000
    28             (BASE PROJECT ALLOCATION - $325,000)
    29     (III)  FFY 2000 TRANSIT BUS ACQUISITION               188,000
    30             (BASE PROJECT ALLOCATION - $188,000)
    19990H1023B3629                 - 27 -

     1  (7)  FAYETTE COUNTY TRANSIT
     2     (I)  BUS ACQUISITION                                  431,000
     3             (BASE PROJECT ALLOCATION - $431,000)
     4  (8)  LEHIGH AND NORTHAMPTON TRANSPORTATION
     5     AUTHORITY
     6     (I)  BUS PROCUREMENT                                  533,000
     7             (BASE PROJECT ALLOCATION - $533,000)
     8  (9)  PORT AUTHORITY OF ALLEGHENY COUNTY
     9     (I)  BUS PROCUREMENT                               10,000,000
    10             (BASE PROJECT ALLOCATION - $10,000,000)
    11     (II)  NORTH SHORE CONNECTOR                         8,333,000
    12             (BASE PROJECT ALLOCATION - $8,333,000)
    13     (III)  FFY 1999 THROUGH 2002 ADDITIONAL FEDERAL
    14         FLEX FUNDING                                    1,250,000
    15             (BASE PROJECT ALLOCATION - $1,250,000)
    16  (10)  SOUTHEASTERN PENNSYLVANIA TRANSPORTATION
    17     AUTHORITY
    18     (I)  FFY 2001 SECTION 9 PROGRAM                    10,833,000
    19             (BASE PROJECT ALLOCATION - $10,833,000)
    20     (II)  FFY 2001 SECTION 3 FIXED GUIDEWAY
    21         PROGRAM                                        15,625,000
    22             (BASE PROJECT ALLOCATION - $15,625,000)
    23     (III)  GIRARD AVENUE LIGHT RAIL INFRASTRUCTURE        625,000
    24             (BASE PROJECT ALLOCATION - $625,000)
    25     (IV)  EXTENSION OF RAIL SERVICE ELWYN TO WAWA       1,667,000
    26             (BASE PROJECT ALLOCATION - $1,667,000)
    27     (V)  FRANKFORT TRANSPORTATION CENTER                1,042,000
    28             (BASE PROJECT ALLOCATION - $1,042,000)
    29     (VI)  PAOLI TRANSPORTATION CENTER                     208,000
    30             (BASE PROJECT ALLOCATION - $208,000)
    19990H1023B3629                 - 28 -

     1     (VII)  1999-2000 VEHICLE OVERHAUL                  42,000,000
     2             (BASE PROJECT ALLOCATION - $42,000,000)
     3     (VIII)  2000-2001 VEHICLE OVERHAUL                 42,000,000
     4             (BASE PROJECT ALLOCATION - $42,000,000)
     5     (IX)  SILVERLINER PROPULSION SYSTEM UPGRADES          625,000
     6             (BASE PROJECT ALLOCATION - $625,000)
     7     (X)  FFY 2001 BUS PURCHASE                          3,563,000
     8             (BASE PROJECT ALLOCATION - $3,563,000)
     9     (XI)  FFY 2001 FLEX FUNDING PROGRAM                 3,698,000
    10             (BASE PROJECT ALLOCATION - $3,698,000)
    11     (XII)  1999-2000 INFRASTRUCTURE SAFETY RENEWAL
    12         PROJECTS                                       15,000,000
    13             (BASE PROJECT ALLOCATION - $15,000,000)
    14     (XIII)  2000-2001 INFRASTRUCTURE SAFETY RENEWAL
    15         PROJECTS                                       15,000,000
    16             (BASE PROJECT ALLOCATION - $15,000,000)
    17     (XIV)  DESIGN AND CONSTRUCTION OF SCHUYLKILL
    18         VALLEY AND CROSS COUNTY METROS                300,000,000
    19     (XV)  CROSS COUNTRY METRO - PRELIMINARY
    20         ENGINEERING                                       417,000
    21  (11)  SHENANGO VALLEY SHUTTLE SERVICE
    22     (I)  BUS PURCHASE                                      88,000
    23             (BASE PROJECT ALLOCATION - $88,000)
    24  (12)  DEPARTMENT OF TRANSPORTATION
    25     (I)  ADDITIONAL FUNDING FOR THE KEYSTONE RAIL
    26         INITIATIVE                                      4,000,000
    27             (BASE PROJECT ALLOCATION - $4,000,000)
    28     (II)  PRECONSTRUCTION OF A REGIONAL HIGH-SPEED
    29         MAGNETIC LEVITATION DEMONSTRATION PROJECT       1,250,000
    30     (B)  RURAL AND INTERCITY RAIL.--ADDITIONAL CAPITAL PROJECTS
    19990H1023B3629                 - 29 -

     1  IN THE CATEGORY OF TRANSPORTATION ASSISTANCE PROJECTS FOR RURAL
     2  AND INTERCITY RAIL SERVICE PROJECTS TO BE CONSTRUCTED OR WITH
     3  RESPECT TO WHICH AN INTEREST IS TO BE ACQUIRED BY THE DEPARTMENT
     4  OF TRANSPORTATION, ITS SUCCESSORS OR ASSIGNS, AND TO BE FINANCED
     5  BY THE INCURRING OF DEBT, ARE HEREBY ITEMIZED, TOGETHER WITH
     6  THEIR RESPECTIVE ESTIMATED FINANCIAL COSTS, AS FOLLOWS:
     7                                                           TOTAL  
     8                                                          PROJECT 
     9             PROJECT                                    ALLOCATION
    10  (1)  BUFFALO & PITTSBURGH RAILROAD
    11     (I)  ARMSTRONG COUNTY
    12         (A)  REHABILITATION OF ALLEGHENY RIVER
    13             BRIDGE OF BUFFALO & PITTSBURGH RAILROAD
    14             INCLUDING REPLACEMENT OF TIES, BEARINGS
    15             AND DECKING REPAIRS                           880,000
    16             (BASE PROJECT ALLOCATION - $800,000)
    17             (DESIGN AND CONTINGENCIES - $80,000)
    18     (II)  BUTLER COUNTY
    19         (A)  REHABILITATION OF BUTLER YARD
    20             INCLUDING REHABILITATION OF AREA
    21             SIDINGS AND THE REPLACEMENT OF RAIL,
    22             TIES, SWITCHES AND SURFACING                1,320,000
    23             (BASE PROJECT ALLOCATION - $1,200,000)
    24             (DESIGN AND CONTINGENCIES - $120,000)
    25     (III)  CLEARFIELD COUNTY
    26         (A)  REHABILITATION OF THE DUBOIS YARD
    27             INCLUDING REPLACEMENT OF RAIL, TIES,
    28             SWITCHES AND SURFACING TO HANDLE
    29             286,000-POUND CARS                          1,320,000
    30             (BASE PROJECT ALLOCATION - $1,200,000)
    19990H1023B3629                 - 30 -

     1             (DESIGN AND CONTINGENCIES - $120,000)
     2  (2)  PITTSBURGH & SHAWMUT RAILROAD
     3     (I)  ARMSTRONG COUNTY
     4         (A)  CONSTRUCTION OF RAIL SIDING TO ACCESS
     5             FREEPORT TERMINAL LOCATED IN FREEPORT,
     6             FROM THE PITTSBURGH & SHAWMUT RAILROAD,
     7             INCLUDING A NEW RAIL SPUR WITH MULTIPLE
     8             SIDINGS FOR TRANSFER AND LOADING AND
     9             UNLOADING OF VARIOUS COMMODITIES AND
    10             CONSTRUCTION OF A CONNECTION TO
    11             EXISTING RAILROAD INCLUDING ACCESS
    12             UNDER THE NORFOLK SOUTHERN CONEMAUGH
    13             LINE                                        3,850,000
    14             (BASE PROJECT ALLOCATION - $3,500,000)
    15             (DESIGN AND CONTINGENCIES - $350,000)
    16         (B)  CONSTRUCTION OF A NEW RAIL SIDING TO
    17             ACCESS ROSEBUD MINING CLINTON RESERVE
    18             TO HANDLE THE EQUIVALENT OF 240 CARS
    19             FOR CONTINUOUS LOADING AND UNLOADING
    20             OFF THE MAIN LINE. INCLUDE ALL RAIL
    21             INFRASTRUCTURE INCLUDING EXCAVATION         2,750,000
    22             (BASE PROJECT ALLOCATION - $2,500,000)
    23             (DESIGN AND CONTINGENCIES - $250,000)
    24     (II)  UPGRADE PITTSBURGH & SHAWMUT CONNECTION
    25         AT FALLS CREEK                                    330,000
    26             (BASE PROJECT ALLOCATION - $300,000)
    27             (DESIGN AND CONTINGENCIES - $30,000)
    28     (III)  UPGRADE RIKER YARD AT PUNXSUTAWNEY TO
    29         INCREASE CAPACITY INCLUDING RAIL, RAILROAD
    30         TIES, BALLAST, SWITCHES AND OTHER RELATED
    19990H1023B3629                 - 31 -

     1         INFRASTRUCTURE IMPROVEMENTS AND EXPAND
     2         BUTLER YARD CAPACITY INCLUDING RAIL,
     3         RAILROAD TIES, BALLAST, ADDITIONAL SWITCHES
     4         AND OTHER RELATED INFRASTRUCTURE
     5         IMPROVEMENTS                                    1,100,000
     6             (BASE PROJECT ALLOCATION - $1,000,000)
     7             (DESIGN AND CONTINGENCIES - $100,000)
     8     (IV)  REPLACE SELECTED RAIL AND RAILROAD TIES
     9         ON VARIOUS CURVES AND REPLACE VARIOUS
    10         SWITCHES AND SIGNALS TO HANDLE ADDITIONAL
    11         STRESS AND WEIGHT BETWEEN PUNXSUTAWNEY AND
    12         BRADFORD                                        1,320,000
    13             (BASE PROJECT ALLOCATION - $1,200,000)
    14             (DESIGN AND CONTINGENCIES - $120,000)
    15  (3)  PHILADELPHIA COUNTY, PHILADELPHIA INDUSTRIAL
    16     DEVELOPMENT CORPORATION
    17     (I)  FOR THE ACQUISITION, REHABILITATION,
    18         RECONSTRUCTION AND CONSTRUCTION OF RAILROAD
    19         TRACK ON A RIGHT-OF-WAY LOCATED ON AND
    20         ADJACENT TO THE NEW DEPENDABLE DISTRIBUTION
    21         SITE BETWEEN BUCKIUS STREET AND ORTHODOX
    22         STREET. THESE FUNDS WILL BE USED FOR ANY
    23         AND ALL WORK, INCLUDING, BUT NOT LIMITED
    24         TO, ACQUISITION, DESIGN, ENGINEERING AND
    25         CONSULTATIVE SERVICES, SWITCHES AND
    26         SIDETRACKS, AND POWER TRANSMISSION TOWER
    27         RELOCATION, NECESSARY TO REACTIVATE AND
    28         ACTIVATE THE RAIL LINE AND RAIL SERVICE
    29         INTO AND ON THE SITE                            1,000,000
    30  (4)  PHILADELPHIA COUNTY, SJA CONSTRUCTION INC.
    19990H1023B3629                 - 32 -

     1     (I)  REHABILITATION OF TRACK, INCLUDING RAIL,
     2         TIES, SWITCHES AND ANY OTHER TRACK-RELATED
     3         REPAIR WORK AND THE PURCHASE OF REQUIRED
     4         LOADING AND UNLOADING EQUIPMENT FOR USE AT
     5         THE RAIL FACILITY AT GIRARD POINT                 900,000
     6  (5)  READING BLUE MOUNTAIN AND NORTHERN RAILROAD
     7     COMPANY
     8     (I)  REHABILITATION OF THE TRACK INCLUDING
     9         CROSS TIE REPLACEMENT, GRADE CROSSING
    10         RENEWAL, TRACK SURFACING, SIGNAL REPAIR AND
    11         ANY OTHER RELATED TRACK REPAIR WORK, BERKS,
    12         CARBON, LACKAWANNA, LUZERNE, SCHUYLKILL AND
    13         WYOMING COUNTIES                                1,500,000
    14     (II)  REPLACEMENT OF WELDED RAIL LAND AND ANY
    15         OTHER RELATED TRACK REPAIR WORK, BERKS AND
    16         SCHUYLKILL COUNTIES                             1,500,000
    17  (6)  DELAWARE AND HUDSON RAILWAY
    18     (I)  COLUMBIA COUNTY
    19         (A)  REHABILITATION OF DELAWARE AND HUDSON
    20             MAIN LINE FROM MILEPOST 722 TO MILEPOST
    21             729, INCLUDING BALLAST UNDERCUTS AND
    22             REPLACEMENT OF TIES AND WORN RAIL           1,403,000
    23             (BASE PROJECT ALLOCATION - $1,275,000)
    24             (DESIGN AND CONTINGENCIES - $128,000)
    25     (II)  LACKAWANNA COUNTY
    26         (A)  INSTALL NEW TRACK AND TURNOUTS TO
    27             EXPAND SWITCHING CAPACITY AT TAYLOR
    28             YARD TO SERVICE GROWING CUSTOMER NEEDS
    29             IN NORTHEAST PENNSYLVANIA                   2,750,000
    30             (BASE PROJECT ALLOCATION - $2,500,000)
    19990H1023B3629                 - 33 -

     1             (DESIGN AND CONTINGENCIES - $250,000)
     2     (III)  LUZERNE COUNTY
     3         (A)  REBUILD FORMER RAILROAD SIDING IN
     4             HANOVER TO INCREASE CAPACITY ON SUNBURY
     5             MAIN LINE OF DELAWARE AND HUDSON
     6             RAILWAY AND TO REDUCE RAIL CONGESTION
     7             AND PROVIDE BETTER CUSTOMER SERVICE         2,200,000
     8             (BASE PROJECT ALLOCATION - $2,000,000)
     9             (DESIGN AND CONTINGENCIES - $200,000)
    10         (B)  REHABILITATION OF DELAWARE AND HUDSON
    11             MAIN LINE FROM MILEPOST 688 TO MILEPOST
    12             713, INCLUDING BALLAST UNDERCUTS AND
    13             REPLACEMENT OF TIES AND WORN RAIL           1,084,000
    14             (BASE PROJECT ALLOCATION - $985,000)
    15             (DESIGN AND CONTINGENCIES - $99,000)
    16         (C)  REFURBISH APPROXIMATELY 3,000 FEET OF
    17             TRACK AND INSTALL AND REHABILITATE
    18             TURNOUT AT FORMER NANTICOKE YARD TO
    19             HANDLE TRANSFER OF BULK COMMODITIES           990,000
    20             (BASE PROJECT ALLOCATION - $900,000)
    21             (DESIGN AND CONTINGENCIES - $90,000)
    22         (D)  REHABILITATE AND CONSTRUCT FACILITY
    23             VILLAGE INTERMODAL FACILITY AT AVOCA
    24             FOR TRANSLOADING VARIOUS CONSUMER
    25             COMMODITIES AT A FORMER BROWNFIELD
    26             INDUSTRIAL SITE                             2,200,000
    27             (BASE PROJECT ALLOCATION - $2,000,000)
    28             (DESIGN AND CONTINGENCIES - $200,000)
    29         (E)  REBUILD APPROXIMATELY 5,000 FEET OF
    30             TRACK INFRASTRUCTURE AT OLD HONEY POT
    19990H1023B3629                 - 34 -

     1             YARD AT NANTICOKE SITUATE IN NEWPORT
     2             TOWNSHIP FOR THE LOCATION OF A BULK
     3             TRANSFER FACILITY                             633,000
     4             (BASE PROJECT ALLOCATION - $575,000)
     5             (DESIGN AND CONTINGENCIES - $58,000)
     6  (7)  NORTH SHORE RAILROAD
     7     (I)  NORTHUMBERLAND COUNTY
     8         (A)  CONSTRUCT NEW INTERCHANGE TRACK WITH
     9             SEDA-COG SYSTEM OF NORTH SHORE RAILROAD
    10             AND DELAWARE AND HUDSON TO HANDLE NEW
    11             CUSTOMER TRAFFIC DEMANDS                    1,595,000
    12             (BASE PROJECT ALLOCATION - $1,450,000)
    13             (DESIGN AND CONTINGENCIES - $145,000)
    14  (8)  TAYLOR INTERMODAL
    15     (I)  LACKAWANNA COUNTY
    16         (A)  REHABILITATION OF RAIL INFRASTRUCTURE
    17             AT THE TAYLOR INTERMODAL FACILITY OF
    18             NORTHEAST FREIGHT TRANSFER TO INCREASE
    19             CAPACITY AND IMPROVE CUSTOMER SERVICE       1,076,000
    20             (BASE PROJECT ALLOCATION - $979,000)
    21             (DESIGN AND CONTINGENCIES - $97,000)
    22  (9)  PENN EASTERN RAIL LINES, INC.
    23     (I)  CONSTRUCTION OF A NEW SIDING AT SINKING
    24         SPRING TO INCREASE THE SAFETY AND
    25         EFFICIENCY OF THE INTERCHANGE BETWEEN PENN
    26         EASTERN RAIL LINES, INC., AND NORFOLK
    27         SOUTHERN                                          231,000
    28  (10)  NOVOLOG, INC.
    29     (I)  BUCKS COUNTY
    30         (A)  RAIL REHABILITATION PROJECT                1,000,000
    19990H1023B3629                 - 35 -

     1  (11)  R.J. CORMAN RAILROAD COMPANY
     2     (I)  REHABILITATION OF THE RAIL LINE KNOWN AS
     3         THE CLEARFIELD CLUSTER, LOCATED IN CAMBRIA,
     4         CLEARFIELD, CENTRE, INDIANA AND JEFFERSON
     5         COUNTIES                                        2,000,000
     6     (C)  AIR TRANSPORTATION.--ADDITIONAL CAPITAL PROJECTS IN THE
     7  CATEGORY OF TRANSPORTATION ASSISTANCE PROJECTS FOR AIR
     8  TRANSPORTATION SERVICE TO WHICH AN INTEREST IS TO BE ACQUIRED BY
     9  THE DEPARTMENT OF TRANSPORTATION, ITS SUCCESSORS OR ASSIGNS, AND
    10  TO BE FINANCED BY THE INCURRING OF DEBT ARE HEREBY ITEMIZED,
    11  TOGETHER WITH THEIR RESPECTIVE ESTIMATED FINANCIAL COSTS, AS
    12  FOLLOWS:
    13                                                           TOTAL  
    14                                                          PROJECT 
    15             PROJECT                                    ALLOCATION
    16  (1)  BEDFORD COUNTY
    17     (I)  BEDFORD COUNTY AIR INDUSTRIAL PARK
    18         AUTHORITY
    19         (A)  CONSTRUCTION OF A CORPORATE HANGAR           375,000
    20  (2)  CARBON COUNTY
    21     (I)  CARBON COUNTY AIRPORT, CONSTRUCTION OF TWO
    22         10-UNIT T HANGARS AND ASSOCIATED SITE
    23         IMPROVEMENTS AND TAXIWAY IMPROVEMENTS             611,000
    24  (3)  CRAWFORD COUNTY
    25     (I)  PORT MEADVILLE AIRPORT
    26         (A)  CONSTRUCTION OF SIX SINGLE AIRCRAFT
    27             HANGARS                                       275,000
    28  (4)  DAUPHIN COUNTY
    29     (I)  HARRISBURG INTERNATIONAL AIRPORT
    30         (A)  ENHANCEMENT TO EXISTING AIRPORT
    19990H1023B3629                 - 36 -

     1             TERMINAL FACILITIES AND CONSTRUCTION OF
     2             NEW TERMINAL AREA IMPROVEMENTS              7,000,000
     3  (5)  ERIE COUNTY
     4     (I)  ERIE MUNICIPAL AIRPORT
     5         (A)  LAND ACQUISITION AND SAFETY
     6             IMPROVEMENTS FOR RUNWAY 6-24                5,000,000
     7         (B)  RAMP IMPROVEMENTS FOR TERMINAL, PHASE
     8             II                                          4,000,000
     9         (C)  RELOCATE OR EXTEND RUNWAY 6-24            22,500,000
    10  (6)  YORK COUNTY
    11     (I)  AIR TRANSPORTATION AUTHORITY OF YORK
    12         COUNTY, REPLACEMENT OF HANGARS AT YORK
    13         AIRPORT                                           565,000
    14     (II)  CAPITAL CITY AIRPORT
    15         (A)  REHABILITATION OF EXISTING AVIATION
    16             FACILITIES AND CONSTRUCTION OF NEW
    17             HANGARS                                       500,000
    18  SECTION 7.  ITEMIZATION OF REDEVELOPMENT ASSISTANCE PROJECTS.
    19     ADDITIONAL CAPITAL PROJECTS IN THE CATEGORY OF REDEVELOPMENT
    20  ASSISTANCE PROJECTS FOR CAPITAL GRANTS BY THE DEPARTMENT OF
    21  COMMUNITY AND ECONOMIC DEVELOPMENT, ITS SUCCESSORS OR ASSIGNS,
    22  AUTHORIZED UNDER THE PROVISIONS OF THE ACT OF MAY 20, 1949
    23  (P.L.1633, NO.493), KNOWN AS THE HOUSING AND REDEVELOPMENT
    24  ASSISTANCE LAW, AND REDEVELOPMENT ASSISTANCE CAPITAL PROJECTS
    25  AND TO BE FINANCED BY THE INCURRING OF DEBT, ARE HEREBY
    26  ITEMIZED, TOGETHER WITH THEIR ESTIMATED FINANCIAL COSTS, AS
    27  FOLLOWS:
    28                                                           TOTAL  
    29                                                          PROJECT 
    30             PROJECT                                    ALLOCATION
    19990H1023B3629                 - 37 -

     1  (1)  ADAMS COUNTY (RESERVED)
     2  (2)  ALLEGHENY COUNTY
     3     (I)  CITY OF PITTSBURGH
     4         (A)  CONSTRUCTION AND DEVELOPMENT OF THE
     5             UPMC PITTSBURGH CANCER RESEARCH CLINIC      1,500,000
     6     (II)  COUNTY PROJECTS
     7         (A)  PITTSBURGH INTERNATIONAL AIRPORT
     8             MAINTENANCE COMPLEX, DEVELOPMENT OF
     9             STATE-OF-THE-ART MAINTENANCE AND
    10             TRAINING COMPLEX FOR THE NEW FLEET OF
    11             US AIRWAYS PLANES. THIS PROJECT SHALL
    12             BE CONSTRUED AS AN ADDITION TO THE
    13             PROJECT AUTHORIZED IN SECTION
    14             6(2)(XII)(L) OF THE ACT OF JUNE 25,
    15             1999 (P.L.237, NO.35), KNOWN AS THE
    16             CAPITAL BUDGET PROJECT ITEMIZATION ACT
    17             FOR 1999-2000                              50,000,000
    18         (B)  RENOVATION AND EXPANSION OF MAIN
    19             CAMPUS BUILDING OF AUBERLE SCHOOL           1,050,000
    20         (C)  RENOVATION, RESTORATION AND FACILITY 
    21             ENHANCEMENT OF POINT PARK COLLEGE          10,000,000
    22         (D)  ACQUISITION, DEMOLITION AND SITE
    23             PREPARATION OF PROPERTY WEST OF
    24             DUQUESNE INCLINE'S LOWER STATION FOR
    25             CONSTRUCTION OF SOUTH SHORE RESTAURANT
    26             AND PARKING FACILITY                        5,500,000
    27         (E)  CONSTRUCTION OF A NEW FACILITY TO
    28             HOUSE REGIONAL EDUCATIONAL PROGRAMS FOR
    29             CREATIVE AND PERFORMING ARTS               10,000,000
    30         (F)  HEINZ HISTORY CENTER                         150,000
    19990H1023B3629                 - 38 -

     1     (III)  ALLEGHENY COUNTY SANITARY AUTHORITY
     2         (A)  THREE RIVERS WET WEATHER DEMONSTRATION
     3             PROJECT                                    26,300,000
     4         (B)  NINE MILE RUN HABITAT RESTORATION
     5             PROJECT                                     2,700,000
     6     (IV)  WEST HOMESTEAD BOROUGH
     7         (A)  CONSTRUCTION OF A NEW MUNICIPAL
     8             BUILDING TO BE LOCATED AT THE CORNER OF
     9             EIGHTH AND FOREST AVENUES                     400,000
    10     (V)  CARNEGIE BOROUGH
    11         (A)  CARNEGIE DOWNTOWN REVITALIZATION             650,000
    12     (VI)  SOUTH PARK TOWNSHIP
    13         (A)  PARK IMPROVEMENTS                            500,000
    14  (3)  ARMSTRONG COUNTY
    15     (I)  COUNTY PROJECTS
    16         (A)  REHABILITATION OF THE FORD CITY
    17             INDUSTRIAL HERITAGE MUSEUM                  4,000,000
    18  (4)  BEAVER COUNTY
    19     (I)  COUNTY PROJECTS
    20         (A)  DEVELOPMENT AND CONSTRUCTION OF THE
    21             CENTER FOR THE ARTS, IN ASSOCIATION
    22             WITH GENEVA COLLEGE                         8,000,000
    23         (B)  RENOVATION OF THE FORMER FARMERS
    24             SAVING AND LOAN BUILDING FOR USE BY THE
    25             BEAVER COUNTY INDUSTRIAL HERITAGE
    26             MUSEUM                                      1,500,000
    27         (C)  ACQUISITION AND DEVELOPMENT OF
    28             PROPERTY ALONG ROUTE 65 IN PORT
    29             AMBRIDGE FOR USE AS AN INDUSTRIAL PARK      2,500,000
    30         (D)  ACQUISITION, DEVELOPMENT AND
    19990H1023B3629                 - 39 -

     1             CONSTRUCTION OF THE AMBRIDGE REGIONAL
     2             INDUSTRIAL RE-USE CENTER ALONG DUSS
     3             AVENUE IN HARMONY TOWNSHIP AND AMBRIDGE
     4             BOROUGH                                     1,200,000
     5         (E)  ACQUISITION, DEVELOPMENT AND
     6             CONSTRUCTION OF A MULTITENANT BUSINESS
     7             INCUBATOR IN ASSOCIATION WITH THE
     8             CORPORATION FOR OWNER-OPERATOR
     9             PROJECTS                                    2,750,000
    10  (5)  BEDFORD COUNTY
    11     (I)  BOROUGH OF HOLLIDAYSBURG
    12         (A)  HOLLIDAYSBURG COMMUNITY PARTNERSHIP -
    13             CONSTRUCTION OF SLINKY MUSEUM AND
    14             PARKING GARAGE                              2,450,000
    15  (6)  BERKS COUNTY
    16     (I)  COUNTY PROJECTS
    17         (A)  REPLACEMENT OF FELIX DAM                   3,900,000
    18  (7)  BLAIR COUNTY
    19     (I)  COUNTY PROJECTS
    20         (A)  ALLEGHENY COLLEGE - EVERETT CAMPUS,
    21             CONSTRUCTION OF ADDITIONAL CLASSROOMS
    22             AND PURCHASE OF EQUIPMENT                     600,000
    23  (8)  BRADFORD COUNTY (RESERVED)
    24  (9)  BUCKS COUNTY
    25     (I)  BRISTOL TOWNSHIP
    26         (A)  DEVELOPMENT AND CONSTRUCTION OF A
    27             MULTIPURPOSE STADIUM AND SPORTS
    28             FACILITY                                   10,500,000
    29         (B)  RENOVATIONS TO MUNICIPAL BUILDING          2,400,000
    30  (10)  BUTLER COUNTY
    19990H1023B3629                 - 40 -

     1     (I)  COUNTY PROJECTS
     2         (A)  PITTSBURGH METAL PURIFYING,
     3             ACQUISITION, REHABILITATION AND
     4             RENOVATION OF AN 88,000 SQUARE FOOT
     5             INDUSTRIAL BUILDING                         3,500,000
     6         (B)  ALAMEDA PARK - EROSION AND
     7             SEDIMENTATION CONTROL AND RELOCATION OF
     8             A PORTION OF SULLIVAN RUN                      88,000
     9         (C)  ALAMEDA PARK - CONSTRUCTION OF A NEW
    10             PARK OFFICE, LODGE, MAINTENANCE
    11             FACILITY, AND ROADS AND PARKING
    12             FACILITIES, RESTROOMS AND AN ALL-SEASON
    13             DOME FOR AN EXISTING SWIMMING POOL            850,000
    14  (11)  CAMBRIA COUNTY (RESERVED)
    15  (12)  CAMERON COUNTY (RESERVED)
    16  (13)  CARBON COUNTY (RESERVED)
    17  (14)  CENTRE COUNTY
    18     (I)  COUNTY PROJECTS
    19         (A)  CONSTRUCTION OF THE SHANER SPORTS
    20             COMPLEX                                     2,000,000
    21  (15)  CHESTER COUNTY
    22     (I)  COUNTY PROJECTS
    23         (A)  CONSTRUCTION OF A REGIONAL/COMMUNITY
    24             MUSIC AND PERFORMING ARTS FACILITY
    25             INCLUDING INSTRUCTIONAL, CLASSROOM AND
    26             REHEARSAL FACILITIES FOR THE USE BY THE
    27             WEST CHESTER UNIVERSITY OF
    28             PENNSYLVANIA                               12,000,000
    29         (B)  CONSTRUCTION OF A REGIONAL
    30             CONFERENCE/CONVENTION AND COMMUNITY
    19990H1023B3629                 - 41 -

     1             CENTER IN CONJUNCTION WITH WEST CHESTER
     2             UNIVERSITY FOR THE PURPOSE OF PROVIDING
     3             A STATE-OF-THE-ART FACILITY FOR
     4             REGIONAL, COMMUNITY AND UNIVERSITY
     5             EVENTS                                     10,000,000
     6         (C)  PHOENIXVILLE AREA YMCA PROGRAM CENTER
     7             - LAND ACQUISITION AND CONSTRUCTION OF
     8             A FAMILY WELLNESS CENTER, INCLUDING AN
     9             ALL-PURPOSE ACTIVITY ROOM TEEN AND
    10             SENIOR CENTERS, MAINTENANCE SHOP,
    11             BALLFIELD AND PARKING                         950,000
    12     (II)  TREDYFFRIN TOWNSHIP
    13         (A)  CONSTRUCTION OF THE PAOLI INTERMODAL
    14             TRANSPORTATION FACILITY AT THE PAOLI
    15             RAILYARD SITUATE IN TREDYFFRIN TOWNSHIP
    16             AND WILLISTOWN TOWNSHIP                     8,000,000
    17  (16)  CLARION COUNTY
    18     (I)  COUNTY PROJECTS
    19         (A)  BEAVER CREEK DAM CONSTRUCTION,
    20             INCLUDING CONSTRUCTION OF A TREATMENT
    21             PLANT AND NEW WATER LINES                   5,150,000
    22         (B)  DEVELOPMENT OF THE BEAVER TOWNSHIP
    23             INDUSTRIAL PARK, INCLUDING LAND
    24             ACQUISITION, PUBLIC WATER AND SEWER
    25             INFRASTRUCTURE AND THE CONSTRUCTION OF
    26             AN ACCESS ROAD                                642,000
    27         (C)  CONSTRUCTION OF THE ALLEGHENY-CLARION
    28             VALLEY COMMUNITY CENTER                       604,000
    29  (17)  CLEARFIELD COUNTY
    30     (I)  NORTH CENTRAL PENNSYLVANIA REGIONAL
    19990H1023B3629                 - 42 -

     1         PLANNING AND DEVELOPMENT COMMISSION
     2         (A)  ACQUISITION AND CONSTRUCTION OF AN
     3             EDUCATION, WORK FORCE DEVELOPMENT AND
     4             TECHNOLOGY CENTER                           4,000,000
     5  (18)  CLINTON COUNTY
     6     (I)  COUNTY PROJECTS
     7         (A)  ACQUISITION, CONSTRUCTION AND
     8             RENOVATION OF KEYSTONE CENTRAL SCHOOL
     9             DISTRICT PROPERTIES FOR EDUCATIONAL AND
    10             COMMUNITY PURPOSES IN ASSOCIATION WITH
    11             LOCK HAVEN UNIVERSITY OF PENNSYLVANIA       3,400,000
    12  (19)  COLUMBIA COUNTY (RESERVED)
    13  (20)  CRAWFORD COUNTY
    14     (I)  COUNTY PROJECTS
    15         (A)  CONSTRUCTION OF A COMMUNITY USE ALL-
    16             WEATHER TRACK FACILITY IN CONJUNCTION
    17             WITH ALLEGHENY COLLEGE                        500,000
    18     (II)  CITY OF MEADVILLE
    19         (A)  CONSTRUCTION OF A DOWNTOWN MEADVILLE
    20             PARKING GARAGE, INCLUDING THE
    21             DEMOLITION OF AN EXISTING BUILDING          2,000,000
    22  (21)  CUMBERLAND COUNTY
    23     (I)  COUNTY PROJECTS
    24         (A)  CONSTRUCTION OF A REGIONAL PERFORMING
    25             AND INSTRUCTIONAL ARTS FACILITY IN
    26             CONJUNCTION WITH THE SHIPPENSBURG
    27             UNIVERSITY FOUNDATION AND SHIPPENSBURG
    28             UNIVERSITY OF PENNSYLVANIA FOR
    29             COMMUNITY AND UNIVERSITY USE               10,000,000
    30  (22)  DAUPHIN COUNTY
    19990H1023B3629                 - 43 -

     1     (I)  CITY OF HARRISBURG
     2         (A)  PURCHASE AND RENOVATION OF A
     3             BROWNFIELD SITE IN THE CAMERON STREET
     4             CORRIDOR FOR DEVELOPMENT OF A
     5             MULTITENANT INDUSTRIAL FACILITY             5,000,000
     6     (II)  COUNTY PROJECTS
     7         (A)  HARRISBURG INTERNATIONAL AIRPORT -
     8             ENVIRONMENTAL REMEDIATION AND
     9             DEMOLITION OF EXISTING STRUCTURES AND
    10             CONSTRUCTION OF NEW INFRASTRUCTURE FOR
    11             CARGO FACILITIES                            5,500,000
    12         (B)  IMPROVEMENTS AND RENOVATIONS TO
    13             VARIOUS DAUPHIN COUNTY LIBRARY SYSTEM
    14             FACILITIES, INCLUDING ADDITIONAL
    15             PARKING CAPACITY, ROOF REPLACEMENTS,
    16             HVAC REPLACEMENTS, LIGHTING UPGRADES,
    17             REPOINTING, STRUCTURAL RESTORATION OF
    18             EAVES, CONSTRUCTION OF NEW FACILITIES
    19             AND ACQUISITION OF FURNISHINGS AND
    20             EQUIPMENT                                   2,650,000
    21     (III)  DERRY TOWNSHIP
    22         (A)  DESIGN AND CONSTRUCTION OF 25,000
    23             SQUARE FEET OF INTERACTIVE EXHIBITS FOR
    24             A NEW HERSHEY MUSEUM                        6,126,000
    25  (23)  DELAWARE COUNTY
    26     (I)  COUNTY PROJECTS
    27         (A)  LAND ACQUISITION, DEVELOPMENT AND
    28             CONSTRUCTION OF A PROFESSIONAL SPORTS
    29             ORGANIZATION HEADQUARTERS, TRAINING AND
    30             PRACTICE FACILITY                          15,000,000
    19990H1023B3629                 - 44 -

     1  (24)  ELK COUNTY
     2     (I)  NORTH CENTRAL PENNSYLVANIA REGIONAL
     3         PLANNING AND DEVELOPMENT COMMISSION
     4         (A)  ACQUISITION, REHABILITATION AND
     5             DEMOLITION OF KOZ INDUSTRIAL PROPERTIES
     6             IN CAMERON, CLEARFIELD, ELK, JEFFERSON,
     7             MCKEAN AND POTTER COUNTIES                  6,000,000
     8  (25)  ERIE COUNTY
     9     (I)  COUNTY PROJECTS
    10         (A)  ACQUISITION OF PROPERTY ADJACENT TO
    11             ERIE MUNICIPAL AIRPORT FOR MULTI-MODAL
    12             FREIGHT DEVELOPMENT                         1,000,000
    13         (B)  SITE IMPROVEMENTS TO THE WATSON-CURTZE
    14             MANSION, INCLUDING LAND ACQUISITION AND
    15             PARKING IMPROVEMENTS                          500,000
    16         (C)  ERIE-WESTERN PA PORT AUTHORITY,
    17             DEVELOPMENT OF A CRUISE/FERRYBOAT
    18             TERMINAL AND REPAIRS TO THE GRAIN
    19             ELEVATOR SLIP                               6,000,000
    20         (D)  ERIE ART MUSEUM AND ERIE COUNTY
    21             HISTORICAL SOCIETY AT DISCOVERY SQUARE,
    22             COMPLETION OF PHASE II OF MUSEUM
    23             COMPLEX, INCLUDING LAND ACQUISITION        25,000,000
    24     (II)  CITY OF ERIE
    25         (A)  DEVELOPMENT OF ERIE BAYFRONT
    26             CONVENTION CENTER. THIS PROJECT SHALL
    27             BE CONSTRUED AS AN ADDITION TO THE
    28             PROJECT AUTHORIZED IN SECTION
    29             6(23)(VIII)(A) OF THE ACT OF JUNE 25,
    30             1999 (P.L.237, NO.35), KNOWN AS THE
    19990H1023B3629                 - 45 -

     1             CAPITAL BUDGET PROJECT ITEMIZATION ACT
     2             FOR 1999-2000                              12,000,000
     3         (B)  RENOVATION AND RETROFIT OF CITY HALL       1,250,000
     4         (C)  DEVELOPMENT OF A SINGLE COMPLEX OF
     5             OPERATIONS FOR THE CITY PUBLIC WORKS
     6             DEPARTMENT AND BUREAU OF PARKS,
     7             INCLUDING LAND ACQUISITION                  1,800,000
     8         (D)  CONSTRUCTION OF A PUBLIC SAFETY AND
     9             COMMUNICATIONS FACILITY                     9,000,000
    10         (E)  REPAIR, RESTORATION AND PRESERVATION
    11             OF HISTORIC BUILDINGS INCLUDING THE
    12             DICKSON TAVERN, THE FIREFIGHTERS
    13             HISTORICAL MUSEUM AND THE ERIE LAND
    14             LIGHTHOUSE                                    550,000
    15         (F)  IMPROVEMENTS AND FACILITY RENOVATIONS
    16             FOR THE CITY-OWNED ERIE GOLF COURSE, J.
    17             C. MARTIN GOLF COURSE AND THE DOWNING
    18             GOLF COURSE                                 2,700,000
    19         (G)  LAND ACQUISITION AND ENVIRONMENTAL
    20             REMEDIATION OF A 25-ACRE BROWNFIELD
    21             SITE FOR THE DEVELOPMENT OF THE EAST
    22             12TH STREET INDUSTRIAL PARK AND THE
    23             CONSTRUCTION OF A MULTITENANT BUILDING      3,000,000
    24         (H)  ERIE ZOO EXPANSION - INCLUDING THE
    25             DEVELOPMENT OF PARKING, REPAIR,
    26             MAINTENANCE AND STORAGE FACILITIES,
    27             INDOOR AND OUTDOOR EXHIBIT SPACE,
    28             BOTANICAL AND HISTORICAL GARDENS, AND
    29             LAND ACQUISITION AND THE RENOVATION OF
    30             THE MARSH STREET BUILDINGS                  5,000,000
    19990H1023B3629                 - 46 -

     1         (I)  LAND ACQUISITION, REHABILITATION AND
     2             ENVIRONMENTAL REMEDIATION FOR VARIOUS
     3             KOZ BROWNFIELD SITES IN THE CITY OF
     4             ERIE FOR REUSE AS INDUSTRIAL PARKS          1,900,000
     5  (26)  FAYETTE COUNTY (RESERVED)
     6  (27)  FOREST COUNTY (RESERVED)
     7  (28)  FRANKLIN COUNTY (RESERVED)
     8  (29)  FULTON COUNTY (RESERVED)
     9  (30)  GREENE COUNTY
    10     (I)  COUNTY PROJECTS
    11         (A)  CONSTRUCTION, RENOVATION AND SITE
    12             IMPROVEMENTS AT WAYNESBURG COLLEGE          2,300,000
    13  (31)  HUNTINGTON COUNTY (RESERVED)
    14  (32)  INDIANA COUNTY (RESERVED)
    15  (33)  JEFFERSON COUNTY (RESERVED)
    16  (34)  JUNIATA COUNTY (RESERVED)
    17  (35)  LACKAWANNA COUNTY
    18     (I)  COUNTY PROJECTS
    19         (A)  CONSTRUCTION OF A GREAT VALLEY
    20             INFORMATION TECHNOLOGY INSTITUTE AND
    21             INCUBATOR AT THE WILKES-BARRE/SCRANTON
    22             INTERNATIONAL AIRPORT CAMPUS                9,000,000
    23  (36)  LANCASTER COUNTY
    24     (I)  ELIZABETHTOWN BOROUGH
    25         (A)  RENOVATION, RESTORATION AND HISTORIC
    26             PRESERVATION OF THE ELIZABETHTOWN TRAIN
    27             STATION AND INTERMODAL TRANSPORTATION
    28             CENTER                                      1,200,000
    29  (37)  LAWRENCE COUNTY
    30     (I)  COUNTY PROJECTS
    19990H1023B3629                 - 47 -

     1         (A)  RIVERVIEW COMMERCE PARK, PHASE III -
     2             FINAL PHASE DEVELOPMENT INCLUDING LAND
     3             ACQUISITION, DEMOLITION, SITE
     4             IMPROVEMENTS AND REHABILITATION OF
     5             EXISTING STRUCTURES                         1,500,000
     6         (B)  MILLENNIUM COMMERCE PARK - LAND
     7             ACQUISITION, INFRASTRUCTURE
     8             IMPROVEMENTS, SITE IMPROVEMENTS AND
     9             CONSTRUCTION OF AN ACCESS ROAD AND
    10             STORM WATER MANAGEMENT SYSTEMS              1,000,000
    11  (38)  LEBANON COUNTY (RESERVED)
    12  (39)  LEHIGH COUNTY (RESERVED)
    13  (40)  LUZERNE COUNTY
    14     (I)  LEHMAN TOWNSHIP
    15         (A)  CONSTRUCTION OF AN INDOOR/OUTDOOR BACK
    16             MOUNTAIN RECREATION COMPLEX, INCLUDING
    17             LAND ACQUISITION AND INFRASTRUCTURE
    18             IMPROVEMENTS                                7,500,000
    19     (II)  WILKES-BARRE CITY
    20         (A)  CONSTRUCTION AND RENOVATION OF A
    21             MULTIPURPOSE SUSQUEHANNA RIVER THEME
    22             TECHNOLOGY, HERITAGE AND TOURISM CENTER
    23             AND SUPPORTING INFRASTRUCTURE AND
    24             PARKING FACILITIES                         30,000,000
    25  (41)  LYCOMING COUNTY (RESERVED)
    26  (42)  MCKEAN COUNTY (RESERVED)
    27  (43)  MERCER COUNTY
    28     (I)  COUNTY PROJECTS
    29         (A)  RENOVATION AND REHABILITATION OF THE
    30             MERCER COUNTY COURTHOUSE                    3,365,000
    19990H1023B3629                 - 48 -

     1     (II)  CITY OF HERMITAGE
     2         (A)  DEVELOPMENT AND CONSTRUCTION OF A
     3             PLANNED TECHNICAL PARK FOR BUSINESS AND
     4             INDUSTRIAL RE-USE AND FOR RECREATIONAL
     5             PURPOSES                                    2,500,000
     6  (44)  MIFFLIN COUNTY
     7     (I)  DOWNTOWN LEWISTOWN, INC.
     8         (A)  DEVELOPMENT AND REDEVELOPMENT RELATED
     9             TO THE "MASTER PLAN FOR DOWNTOWN
    10             LEWISTOWN" AND THE "NEW VISION FOR THE
    11             LEWISTOWN COMMUNITY"                        5,000,000
    12  (45)  MONROE COUNTY (RESERVED)
    13  (46)  MONTGOMERY COUNTY
    14     (I)  COUNTY PROJECTS
    15         (A)  REHABILITATION, RETROFIT AND
    16             RECONSTRUCTION OF ST. GABRIEL'S HALL,
    17             AND THE CHAPEL/GYM AND COTTAGE              5,000,000
    18         (B)  PHOENIXVILLE AREA YMCA, SPRING VALLEY
    19             PROGRAM CENTER - DEVELOPMENT AND
    20             CONSTRUCTION OF A 60,000-SQUARE-FOOT
    21             PROGRAM CENTER, INCLUDING LAND
    22             ACQUISITION                                 3,000,000
    23         (C)  PHOENIXVILLE AREA YMCA, AUDUBON
    24             PROGRAM CENTER - DEVELOPMENT AND
    25             CONSTRUCTION OF A PROGRAM CENTER, POOL
    26             AND LOCKER ROOMS AND RENOVATION OF
    27             EXISTING FACILITIES FOR COMMUNITY USE       1,375,000
    28     (II)  NORRISTOWN BOROUGH
    29         (A)  CONSTRUCTION OF A NEW FIREHOUSE FOR
    30             THE HANCOCK VOLUNTEER FIRE COMPANY            250,000
    19990H1023B3629                 - 49 -

     1  (47)  MONTOUR COUNTY (RESERVED)
     2  (48)  NORTHAMPTON COUNTY (RESERVED)
     3  (49)  NORTHUMBERLAND COUNTY (RESERVED)
     4  (50)  PERRY COUNTY (RESERVED)
     5  (51)  PHILADELPHIA COUNTY
     6     (I)  CITY PROJECTS
     7         (A)  CONSTRUCTION OF A RESIDENT ACTIVITY
     8             CENTER AS AN ADDITION TO WHITEHALL
     9             COMMONS IN THE FRANKFORD SECTION OF THE
    10             CITY LOCATED AT WAKELING AND DITMAN
    11             STREETS                                     1,000,000
    12         (B)  RENOVATIONS TO THE TERRA BUILDING OF
    13             THE UNIVERSITY OF THE ARTS AT BROAD AND
    14             WALNUT STREETS, INCLUDING RESTORATION
    15             OF THE FACADE                               3,200,000
    16         (C)  REHABILITATION OF EASTERN PENITENTIARY
    17             AT CORINTHIAN AND FAIRMOUNT AVENUES.
    18             THIS PROJECT SHALL BE CONSTRUED AS AN
    19             ADDITION TO THE PROJECT AUTHORIZED IN
    20             SECTION 6(44)(I)(CC) OF THE ACT OF JUNE
    21             25, 1999 (P.L.237, NO.35), KNOWN AS THE
    22             CAPITAL BUDGET PROJECT ITEMIZATION ACT
    23             FOR 1999-2000                               1,000,000
    24         (D)  CONSTRUCTION, RENOVATION AND SITE
    25             IMPROVEMENTS FOR A MULTIPURPOSE
    26             COMMUNITY CENTER OPERATED BY THE GIVING
    27             OF SELF PARTNERSHIP, INC., IN THE WEST
    28             OAK LANE AREA                                 250,000
    29         (E)  PRINCE MUSIC THEATER, RENOVATION OF
    30             FACILITY INCLUDING RECONSTRUCTION AND
    19990H1023B3629                 - 50 -

     1             FIT-OUT OF SECOND AND THIRD FLOORS FOR
     2             EDUCATIONAL, TRAINING AND PERFORMANCE
     3             FACILITIES; COMPLETION OF BACKSTAGE
     4             AREAS ON LOWER LEVEL; AND PURCHASE AND
     5             INSTALLATION OF A STATE-OF-THE-ART
     6             TELECOMMUNICATIONS SYSTEM                   2,500,000
     7         (F)  JFK PLAZA, CONSTRUCTION OF RESTAURANT
     8             AND STAIRWAY STRUCTURE IN COMMERCE
     9             SQUARE                                      3,500,000
    10         (G)  LOGAN SQUARE, CONSTRUCTION OF A
    11             PARKING GARAGE                             21,000,000
    12         (H)  LOGAN SQUARE, IMPROVEMENTS TO PARK
    13             BUILDINGS, INCLUDING PAVILIONS, TO
    14             SERVE AS ART EXHIBITS AND DINING AND
    15             INFORMATION CENTERS                        13,000,000
    16         (I)  PENNSYLVANIA AVENUE, CONSTRUCTION OF
    17             PARKING FACILITIES                          3,500,000
    18         (J)  CALDER FOUNDATION MUSEUM, CONSTRUCTION
    19             OF MUSEUM TO BE LOCATED ON THE BENJAMIN
    20             FRANKLIN PARKWAY                            6,000,000
    21         (K)  MOORE COLLEGE OF ART AND DESIGN. FOR
    22             THE PURCHASE OF, RENOVATIONS TO AND
    23             FURNITURE AND FIXTURES FOR 1916 RACE
    24             STREET, 1920 RACE STREET AND 2039
    25             CHERRY STREET IN PHILADELPHIA              12,500,000
    26         (L)  BUILDING PURCHASE AND RENOVATIONS TO
    27             THE PHILADELPHIA VETERANS MULTI-SERVICE
    28             AND EDUCATION CENTER ON NORTH FOURTH
    29             STREET                                        500,000
    30         (M)  SPRUCE HILL COMMUNITY ASSOCIATION,
    19990H1023B3629                 - 51 -

     1             BUILDING CONSTRUCTION AND RENOVATIONS         500,000
     2         (N)  60TH STREET BUSINESS ASSOCIATION,
     3             BUILDING CONSTRUCTION AND RENOVATIONS         500,000
     4         (O)  WOODLAND AVENUE BUSINESS ASSOCIATION,
     5             BUILDING CONSTRUCTION AND RENOVATIONS         500,000
     6         (P)  BALTIMORE AVENUE BUSINESS ASSOCIATION,
     7             BUILDING CONSTRUCTION AND RENOVATIONS         500,000
     8         (Q)  52ND STREET BUSINESS ASSOCIATION,
     9             BUILDING CONSTRUCTION AND RENOVATIONS         500,000
    10         (R)  UNIVERSAL COMMERCIAL CENTER ON AVENUE
    11             OF THE ARTS, BUILDING CONSTRUCTION AND
    12             RENOVATIONS                                13,000,000
    13         (S)  ADDITIONAL FUNDS FOR THE CENTER FOR
    14             HUMAN ADVANCEMENT PROJECT                   3,000,000
    15         (T)  UNIVERSITY OF PENNSYLVANIA SCHOOL OF
    16             VETERINARY MEDICINE, CONSTRUCTION OF A
    17             NEW TEACHING AND RESEARCH BUILDING TO
    18             BE LOCATED AT THE UNIVERSITY'S MAIN
    19             CAMPUS                                     18,000,000
    20  (52)  PIKE COUNTY
    21     (I)  MILFORD BOROUGH
    22         (A)  STREETSCAPE IMPROVEMENT PROJECT            1,053,000
    23  (53)  POTTER COUNTY
    24     (I)  NORTH CENTRAL PENNSYLVANIA REGIONAL
    25         PLANNING AND DEVELOPMENT COMMISSION
    26         (A)  ACQUISITION AND DEVELOPMENT OF
    27             PROPERTIES FOR A TELECOMMUNICATIONS
    28             CENTER AND ANCILLARY SUPPORT IN POTTER
    29             COUNTY                                     30,000,000
    30  (54)  SCHUYLKILL COUNTY (RESERVED)
    19990H1023B3629                 - 52 -

     1  (55)  SNYDER COUNTY (RESERVED)
     2  (56)  SOMERSET COUNTY
     3     (I)  BOROUGH OF WINDBER
     4         (A)  WINDBER INDUSTRIAL PARK,
     5             INFRASTRUCTURE                              1,000,000
     6  (57)  SULLIVAN COUNTY (RESERVED)
     7  (58)  SUSQUEHANNA COUNTY (RESERVED)
     8  (59)  TIOGA COUNTY (RESERVED)
     9  (60)  UNION COUNTY (RESERVED)
    10  (61)  VENANGO COUNTY
    11     (I)  COUNTY PROJECTS
    12         (A)  CONVERSION OF THE DEPARTMENT OF
    13             TRANSPORTATION DISTRICT 1-0
    14             HEADQUARTERS (GALENA BUILDING) FOR
    15             COMMERCIAL/RESIDENTIAL USE                  1,600,000
    16  (62)  WARREN COUNTY (RESERVED)
    17  (63)  WASHINGTON COUNTY (RESERVED)
    18  (64)  WAYNE COUNTY (RESERVED)
    19  (65)  WESTMORELAND COUNTY (RESERVED)
    20  (66)  WYOMING COUNTY (RESERVED)
    21  (67)  YORK COUNTY
    22     (I)  COUNTY PROJECTS
    23         (A)  LEG UP FARM INC. - CONSTRUCTION OF A
    24             THERAPEUTIC HORSE STABLE                    4,560,000
    25         (B)  CENTRAL MARKET HOUSE - INTERIOR
    26             RENOVATIONS                                 2,250,000
    27         (C)  CRISPUS ATTUCKS ASSOCIATION,
    28             CONSTRUCTION OF A JOB TRAINING CENTER         300,000
    29  SECTION 8.  ITEMIZATION OF FLOOD CONTROL PROJECTS.
    30     ADDITIONAL CAPITAL PROJECTS IN THE CATEGORY OF FLOOD CONTROL
    19990H1023B3629                 - 53 -

     1  PROJECTS TO BE CONSTRUCTED BY THE DEPARTMENT OF ENVIRONMENTAL
     2  PROTECTION, ITS SUCCESSORS OR ASSIGNS, AND TO BE FINANCED BY THE
     3  INCURRING OF DEBT ARE HEREBY ITEMIZED, TOGETHER WITH THEIR
     4  RESPECTIVE ESTIMATED COSTS, AS FOLLOWS:
     5                                                           TOTAL  
     6                                                          PROJECT 
     7             PROJECT                                    ALLOCATION
     8  (1)  DEPARTMENT OF ENVIRONMENTAL PROTECTION
     9     (I)  ERIE COUNTY
    10         (A)  CASCADE STREET STORM SEWER
    11             REPLACEMENT, CITY OF ERIE                     750,000
    12     (II)  LYCOMING COUNTY
    13         (A)  MCLURE'S RUN STREAM RESTORATION
    14             PROJECT, INCLUDING CULVERT REPLACEMENT,
    15             LOYALSOCK TOWNSHIP                            117,000
    16         (B)  MUNCY CREEK STREAM RESTORATION
    17             PROJECT, MUNCY CREEK TOWNSHIP                 740,000
    18         (C)  HAGERMAN'S RUN FLOOD CONTROL PROJECT,
    19             INCLUDING THE REHABILITATION AND
    20             UPGRADE OF CONDUIT, SOUTH WILLIAMSPORT
    21             BOROUGH                                     1,000,000
    22         (D)  INTEGRATED FLOOD FORECASTING SYSTEM -
    23             URBAN AREA TOPOGRAPHY STUDY, INCLUDING
    24             HYDROLOGIC STUDIES, STREAM AND RAIN
    25             GAUGING AND FLOOD INUNDATION MAPPING        1,500,000
    26         (E)  LOWER LYCOMING CREEK FLOOD MITIGATION      1,800,000
    27         (F)  COUNTYWIDE FLOOD HAZARD MITIGATION
    28             PROGRAM                                       500,000
    29         (G)  RALSTON FLOOD MITIGATION PROJECT,
    30             VILLAGE OF RALSTON                            300,000
    19990H1023B3629                 - 54 -

     1     (III)  SOMERSET COUNTY, BENSON BOROUGH FEDERAL
     2         FLOOD CONTROL PROJECT
     3         (A)  ADDITIONAL FUNDS FOR THE BENSON
     4             FEDERAL FLOOD CONTROL PROJECT                 260,000
     5             (BASE PROJECT ALLOCATION - $260,000)
     6     (IV)  SOMERSET COUNTY, HOOVERSVILLE BOROUGH
     7         FEDERAL FLOOD CONTROL PROJECT
     8         (A)  ADDITIONAL FUNDS FOR THE HOOVERSVILLE
     9             FEDERAL FLOOD CONTROL PROJECT                 326,000
    10             (BASE PROJECT ALLOCATION - $326,000)
    11     (V)  SULLIVAN COUNTY
    12         (A)  FLOOD CONTROL PROJECT TO PREVENT
    13             RUNOFF FROM LOYALSOCK CREEK, DUSHORE
    14             BOROUGH                                       566,000
    15  SECTION 9.  ITEMIZATION OF KEYSTONE RECREATION, PARK AND
    16                 CONSERVATION PROJECTS.
    17     PROJECTS IN THE CATEGORY OF KEYSTONE RECREATION, PARK AND
    18  CONSERVATION PROJECTS TO BE CONSTRUCTED BY THE DEPARTMENT OF
    19  CONSERVATION AND NATURAL RESOURCES, ITS SUCCESSORS OR ASSIGNS,
    20  AND TO BE FINANCED BY THE INCURRING OF DEBT AND/OR CURRENT
    21  REVENUES, ARE HEREBY ITEMIZED, TOGETHER WITH THEIR RESPECTIVE
    22  ESTIMATED COSTS, AS FOLLOWS:
    23                                                           TOTAL  
    24                                                          PROJECT 
    25             PROJECT                                    ALLOCATION
    26  (1)  DEPARTMENT OF CONSERVATION AND NATURAL
    27     RESOURCES
    28     (I)  BALD EAGLE STATE PARK
    29         (A)  ROAD IMPROVEMENTS                          1,406,000
    30             (BASE PROJECT ALLOCATION - $1,406,000)
    19990H1023B3629                 - 55 -

     1     (II)  CANOE CREEK STATE PARK
     2         (A)  SEWER LINE EXTENSION                         300,000
     3             (BASE PROJECT ALLOCATION - $300,000)
     4     (III)  CODORUS STATE PARK
     5         (A)  RENOVATE PARK OFFICE                         300,000
     6             (BASE PROJECT ALLOCATION - $300,000)
     7     (IV)  COLONEL DENNING STATE PARK
     8         (A)  UPGRADE SEWER SYSTEM                         350,000
     9             (BASE PROJECT ALLOCATION - $350,000)
    10         (B)  RENOVATE WASHHOUSE AND RESTROOMS             600,000
    11             (BASE PROJECT ALLOCATION - $600,000)
    12     (V)  COOK FOREST STATE PARK
    13         (A)  ROAD AND PARKING REHABILITATION              475,000
    14             (BASE PROJECT ALLOCATION - $475,000)
    15     (VI)  FOREST DISTRICT 5
    16         (A)  RESURFACE LAUREL RUN ROAD                    750,000
    17             (BASE PROJECT ALLOCATION - $750,000)
    18     (VII)  FOREST DISTRICT 12 AND 16
    19         (A)  PINE CREEK RAIL/TRAIL IMPROVEMENTS         2,500,000
    20             (BASE PROJECT ALLOCATION - $2,500,000)
    21     (VIII)  HICKORY RUN STATE PARK
    22         (A)  REPLACE PARK OFFICE                        1,500,000
    23             (BASE PROJECT ALLOCATION - $1,500,000)
    24     (IX)  KEYSTONE STATE PARK
    25         (A)  REHABILITATE WATER SYSTEM                    490,000
    26             (BASE PROJECT ALLOCATION - $490,000)
    27         (B)  REHABILITATE SEWER SYSTEM                    350,000
    28             (BASE PROJECT ALLOCATION - $350,000)
    29     (X)  LEONARD HARRISON STATE PARK
    30         (A)  REPLACE RESTROOMS                            350,000
    19990H1023B3629                 - 56 -

     1             (BASE PROJECT ALLOCATION - $350,000)
     2         (B)  REPLACE PIT LATRINES                         400,000
     3             (BASE PROJECT ALLOCATION - $400,000)
     4     (XI)  LITTLE PINE STATE PARK
     5         (A)  REPLACE PARK BRIDGE                          354,000
     6             (BASE PROJECT ALLOCATION - $354,000)
     7     (XII)  MORAINE STATE PARK
     8         (A)  MARINA PAVING                                470,000
     9             (BASE PROJECT ALLOCATION - $470,000)
    10         (B)  REHABILITATE MARINA PILINGS                  350,000
    11             (BASE PROJECT ALLOCATION - $350,000)
    12         (C)  REHABILITATE SEWAGE SYSTEM                   600,000
    13             (BASE PROJECT ALLOCATION - $600,000)
    14     (XIII)  NOCKAMIXON STATE PARK
    15         (A)  REPLACE TOILETS                              400,000
    16             (BASE PROJECT ALLOCATION - $400,000)
    17     (XIV)  OLE BULL STATE PARK
    18         (A)  REPLACE CAUSEWAY                             450,000
    19             (BASE PROJECT ALLOCATION - $450,000)
    20     (XV)  PENN ROOSEVELT STATE PARK
    21         (A)  RECONSTRUCT DAM                              300,000
    22             (BASE PROJECT ALLOCATION - $300,000)
    23     (XVI)  POE VALLEY STATE PARK
    24         (A)  MODERNIZATION OF CAMPGROUND AND
    25             RESTROOM FACILITY                             500,000
    26             (BASE PROJECT ALLOCATION - $500,000)
    27     (XVII)  PRINCE GALLITZIN STATE PARK
    28         (A)  RENOVATION OF SEWAGE TREATMENT PLANT         500,000
    29             (BASE PROJECT ALLOCATION - $500,000)
    30     (XVIII)  PROMISED LANDS STATE PARK
    19990H1023B3629                 - 57 -

     1         (A)  REHABILITATE SEWAGE COLLECTION SYSTEM        750,000
     2             (BASE PROJECT ALLOCATION - $750,000)
     3     (XIX)  PYMATUNING STATE PARK
     4         (A)  BITUMINOUS PAVING                            875,000
     5             (BASE PROJECT ALLOCATION - $875,000)
     6         (B)  INSTALL SHORELINE EROSION PROTECTION       1,500,000
     7             (BASE PROJECT ALLOCATION - $1,500,000)
     8     (XX)  RACCOON CREEK STATE PARK
     9         (A)  ROAD PAVING                                  450,000
    10             (BASE PROJECT ALLOCATION - $450,000)
    11     (XXI)  REEDS GAP STATE PARK
    12         (A)  SWIMMING POOL REPLACEMENT                    490,000
    13             (BASE PROJECT ALLOCATION - $490,000)
    14     (XXII)  SHAWNEE STATE PARK
    15         (A)  REHABILITATE PARK OFFICE                   1,000,000
    16             (BASE PROJECT ALLOCATION - $1,000,000)
    17         (B)  REHABILITATE BATHHOUSE AND CONCESSION        400,000
    18             (BASE PROJECT ALLOCATION - $400,000)
    19     (XXIII)  SHIKELLAMY STATE PARK
    20         (A)  REPLACE MARINA DOCKS                         600,000
    21             (BASE PROJECT ALLOCATION - $600,000)
    22     (XXIV)  SINNEMAHONING STATE PARK
    23         (A)  ROAD IMPROVEMENTS                            300,000
    24             (BASE PROJECT ALLOCATION - $300,000)
    25     (XXV)  SIZERVILLE STATE PARK
    26         (A)  WATER TREATMENT UPGRADES                     300,000
    27             (BASE PROJECT ALLOCATION - $300,000)
    28     (XXVI)  SUSQUEHANNOCK STATE FOREST
    29         (A)  LAND ACQUISITION                           2,000,000
    30             (LAND ALLOCATION - $2,000,000)
    19990H1023B3629                 - 58 -

     1     (XXVII)  YELLOW CREEK STATE PARK
     2         (A)  ROAD RESURFACING                             460,000
     3             (BASE PROJECT ALLOCATION - $460,000)
     4  SECTION 10.  ITEMIZATION OF ENVIRONMENTAL STEWARDSHIP FUND
     5                 PROJECTS.
     6     PROJECTS IN THE CATEGORY OF ENVIRONMENTAL STEWARDSHIP FUND
     7  PROJECTS TO BE CONSTRUCTED BY THE DEPARTMENT OF CONSERVATION AND
     8  NATURAL RESOURCES, ITS SUCCESSORS OR ASSIGNS, AND TO BE FINANCED
     9  BY CURRENT REVENUES, ARE HEREBY ITEMIZED TOGETHER WITH THEIR
    10  RESPECTIVE ESTIMATED FINANCIAL COSTS AS FOLLOWS:
    11                                                           TOTAL  
    12                                                          PROJECT 
    13             PROJECT                                    ALLOCATION
    14  (1)  DEPARTMENT OF CONSERVATION AND NATURAL
    15     RESOURCES
    16     (I)  BALD EAGLE STATE PARK
    17         (A)  REHABILITATE VISITOR CENTER AND
    18             OFFICE                                        700,000
    19             (BASE PROJECT ALLOCATION - $700,000)
    20     (II)  BLACK MOSHANNON STATE PARK
    21         (A)  UPGRADE WATER SYSTEMS AND FACILITIES       1,000,000
    22             (BASE PROJECT ALLOCATION - $1,000,000)
    23     (III)  CHAPMAN STATE PARK
    24         (A)  UPGRADE LATRINES AND BATHHOUSES            1,170,000
    25             (BASE PROJECT ALLOCATION - $1,170,000)
    26     (IV)  CLEAR CREEK STATE PARK
    27         (A)  REPLACE PIT LATRINES                       2,300,000
    28             (BASE PROJECT ALLOCATION - $2,300,000)
    29     (V)  CODORUS STATE PARK
    30         (A)  UPGRADE WATER AND SEWER SYSTEMS              600,000
    19990H1023B3629                 - 59 -

     1             (BASE PROJECT ALLOCATION - $600,000)
     2     (VI)  COWANS GAP STATE PARK
     3         (A)  REHABILITATE CAMPING AREAS                 2,100,000
     4             (BASE PROJECT ALLOCATION - $2,100,000)
     5         (B)  REHABILITATE SEWAGE SYSTEM                   550,000
     6             (BASE PROJECT ALLOCATION - $550,000)
     7     (VII)  DELAWARE CANAL STATE PARK
     8         (A)  REBUILD YARDLEY AQUEDUCT                   1,500,000
     9             (BASE PROJECT ALLOCATION - $1,500,000)
    10         (B)  BRIDGE REPLACEMENT                         1,000,000
    11             (BASE PROJECT ALLOCATION - $1,000,000)
    12     (VIII)  DELAWARE CANAL STATE PARK
    13         (A)  RECONSTRUCT FISH LADDERS                     600,000
    14             (BASE PROJECT ALLOCATION - $600,000)
    15     (IX)  ELK STATE FOREST DISTRICT 13
    16         (A)  RENOVATE DISTRICT OFFICE                     750,000
    17             (BASE PROJECT ALLOCATION - $750,000)
    18     (X)  FORT WASHINGTON STATE PARK
    19         (A)  REPLACE PIT LATRINES AND SEWAGE
    20             COLLECTION SYSTEM                             750,000
    21             (BASE PROJECT ALLOCATION - $750,000)
    22     (XI)  FRANCES SLOCUM STATE PARK
    23         (A)  REHABILITATE BRIDGE AND ROADS                400,000
    24             (BASE PROJECT ALLOCATION - $400,000)
    25         (B)  REPAVE PARK ROAD AND PARKING AREAS           650,000
    26             (BASE PROJECT ALLOCATION - $650,000)
    27     (XII)  FRENCH CREEK STATE PARK
    28         (A)  REHABILITATE CAMPS AND SERVICES            1,440,000
    29             (BASE PROJECT ALLOCATION - $1,440,000)
    30     (XIII)  GIFFORD PINCHOT STATE PARK
    19990H1023B3629                 - 60 -

     1         (A)  RENOVATION OF DAY USE FACILITIES             800,000
     2             (BASE PROJECT ALLOCATION - $800,000)
     3         (B)  REHABILITATE WATER SYSTEM                    500,000
     4             (BASE PROJECT ALLOCATION - $500,000)
     5         (C)  REPLACE PIT LATRINES                         500,000
     6             (BASE PROJECT ALLOCATION - $500,000)
     7     (XIV)  HILLS CREEK STATE PARK
     8         (A)  CAMPGROUND FACILITIES IMPROVEMENTS           300,000
     9             (BASE PROJECT ALLOCATION - $300,000)
    10     (XV)  KETTLE CREEK STATE PARK
    11         (A)  REPLACE PIT LATRINES                         870,000
    12             (BASE PROJECT ALLOCATION - $870,000)
    13     (XVI)  KINGS GAP STATE PARK
    14         (A)  RENOVATE MAIN HOUSE                          800,000
    15             (BASE PROJECT ALLOCATION - $800,000)
    16     (XVII)  LAUREL HILL STATE PARK
    17         (A)  REHABILITATE SEWAGE SYSTEM                   500,000
    18             (BASE PROJECT ALLOCATION - $500,000)
    19         (B)  REPAVE ROAD                                  400,000
    20             (BASE PROJECT ALLOCATION - $400,000)
    21     (XVIII)  LEHIGH GORGE STATE PARK
    22         (A)  BRIDGE AND TRAIL RECONSTRUCTION            1,200,000
    23             (BASE PROJECT ALLOCATION - $1,200,000)
    24     (XIX)  LITTLE BUFFALO STATE PARK
    25         (A)  SWIMMING POOL REHABILITATION               1,275,000
    26             (BASE PROJECT ALLOCATION - $1,275,000)
    27     (XX)  LITTLE PINE STATE PARK
    28         (A)  MODERNIZE RESTROOM AND BATH
    29             FACILITIES                                  1,500,000
    30             (BASE PROJECT ALLOCATION - $1,500,000)
    19990H1023B3629                 - 61 -

     1     (XXI)  LYMAN RUN STATE PARK
     2         (A)  REHABILITATE LYMAN RUN DAM                 1,000,000
     3             (BASE PROJECT ALLOCATION - $1,000,000)
     4     (XXII)  MAURICE K. GODDARD STATE PARK
     5         (A)  REHABILITATE MULTI-USE TRAIL               2,000,000
     6             (BASE PROJECT ALLOCATION - $2,000,000)
     7     (XXIII)  MEMORIAL LAKE STATE PARK
     8         (A)  REHABILITATE DAM AND DAY USE AREA            600,000
     9             (BASE PROJECT ALLOCATION - $600,000)
    10     (XXIV)  MORAINE STATE PARK
    11         (A)  REHABILITATE NORTH AND SOUTH SHORE
    12             PARK ROAD                                   3,500,000
    13             (BASE PROJECT ALLOCATION - $3,500,000)
    14         (B)  DEEPEN MARINA AREA                           900,000
    15             (BASE PROJECT ALLOCATION - $900,000)
    16     (XXV)  NOCKAMIXON STATE PARK
    17         (A)  PIT LATRINE REPLACEMENT AND INSTALL
    18             FISHING PIER                                  700,000
    19             (BASE PROJECT ALLOCATION - $700,000)
    20         (B)  RENOVATE POOL FACILITY                     1,200,000
    21             (BASE PROJECT ALLOCATION - $1,200,000)
    22         (C)  MARINA REHABILITATION                      1,200,000
    23             (BASE PROJECT ALLOCATION - $1,200,000)
    24     (XXVI)  PYMATUNING STATE PARK
    25         (A)  REPLACE PIT LATRINES                       1,000,000
    26             (BASE PROJECT ALLOCATION - $1,000,000)
    27     (XXVII)  OHIOPYLE STATE PARK
    28         (A)  RENOVATE BOATERS CHANGE HOUSE                550,000
    29             (BASE PROJECT ALLOCATION - $550,000)
    30     (XXVIII)  OIL CREEK STATE PARK
    19990H1023B3629                 - 62 -

     1         (A)  REPLACE PIT LATRINES AND ASSOCIATED
     2             UTILITIES                                     750,000
     3             (BASE PROJECT ALLOCATION - $750,000)
     4     (XXIX)  OLE BULL STATE PARK
     5         (A)  REPLACE PIT LATRINES                         750,000
     6             (BASE PROJECT ALLOCATION - $750,000)
     7     (XXX)  PENN NURSERY
     8         (A)  EXPAND AND RENOVATE OFFICE                 1,500,000
     9             (BASE PROJECT ALLOCATION - $1,500,000)
    10     (XXXI)  POE VALLEY STATE PARK
    11         (A)  REPLACE PIT LATRINES                         850,000
    12             (BASE PROJECT ALLOCATION - $850,000)
    13     (XXXII)  PRESQUE ISLE STATE PARK
    14         (A)  RENOVATE PARK OFFICE                         900,000
    15             (BASE PROJECT ALLOCATION - $900,000)
    16     (XXXIII)  PRINCE GALLITZIN STATE PARK
    17         (A)  REHABILITATE SHOWER HOUSE                  1,600,000
    18             (BASE PROJECT ALLOCATION - $1,600,000)
    19         (B)  REHABILITATE SEWER SYSTEM                  1,000,000
    20             (BASE PROJECT ALLOCATION - $1,000,000)
    21     (XXXIV)  PYMATUNING STATE PARK
    22         (A)  REPLACE DOCKS AT JAMESTOWN BOAT
    23             LIVERY                                        800,000
    24             (BASE PROJECT ALLOCATION - $800,000)
    25     (XXXV) R. B. WINTER STATE PARK
    26         (A)  REPLACE PIT LATRINES                       1,950,000
    27             (BASE PROJECT ALLOCATION - $1,950,000)
    28     (XXXVI)  RACCOON CREEK STATE PARK
    29         (A)  REHABILITATE WATER SYSTEM                  1,700,000
    30             (BASE PROJECT ALLOCATION - $1,700,000)
    19990H1023B3629                 - 63 -

     1         (B)  REHABILITATE SEWER SYSTEM                  1,000,000
     2             (BASE PROJECT ALLOCATION - $1,000,000)
     3     (XXXVII)  RICKETTS GLEN STATE PARK
     4         (A)  REHABILITATE PARK INFRASTRUCTURE           1,300,000
     5             (BASE PROJECT ALLOCATION - $1,300,000)
     6         (B)  RENOVATE VISITOR CENTER AND OFFICE         1,100,000
     7             (BASE PROJECT ALLOCATION - $1,100,000)
     8     (XXXVIII)  SHAWNEE STATE PARK
     9         (A)  REPLACE SEWAGE LIFT STATIONS               1,200,000
    10             (BASE PROJECT ALLOCATION - $1,200,000)
    11         (B)  REHABILITATE SEWAGE TREATMENT PLANT          600,000
    12             (BASE PROJECT ALLOCATION - $600,000)
    13     (XXXIX)  SHIKELLAMY STATE PARK
    14         (A)  REHABILITATION OF INFLATABLE DAM             770,000
    15             (BASE PROJECT ALLOCATION - $770,000)
    16     (XL)  SUSQUEHANNOCK STATE FOREST
    17         (A)  RENOVATE OFFICE BUILDING                     750,000
    18             (BASE PROJECT ALLOCATION - $750,000)
    19     (XLI)  TIADAGHTON STATE FOREST
    20         (A)  REHABILITATE PINE CREEK TRAIL              2,000,000
    21             (BASE PROJECT ALLOCATION - $2,000,000)
    22         (B)  RENOVATE/RECONSTRUCT OFFICE BUILDING       1,500,000
    23             (BASE PROJECT ALLOCATION - $1,500,000)
    24     (XLII)  TIOGA STATE FOREST
    25         (A)  RENOVATE OFFICE BUILDING                     700,000
    26             (BASE PROJECT ALLOCATION - $700,000)
    27     (XLIII)  TUSCARORA STATE FOREST
    28         (A)  EXPAND AND RENOVATE OFFICE                   750,000
    29             (BASE PROJECT ALLOCATION - $750,000)
    30     (XLIV)  TYLER STATE PARK
    19990H1023B3629                 - 64 -

     1         (A)  RESURFACING PARK ROADS AND PARKING           500,000
     2             (BASE PROJECT ALLOCATION - $500,000)
     3     (XLV)  WORLDS END STATE PARK
     4         (A)  REPLACE PIT LATRINES                       2,560,000
     5             (BASE PROJECT ALLOCATION - $2,560,000)
     6     (XLVI)  YELLOW CREEK STATE PARK
     7         (A)  REHABILITATE SEWER SYSTEM                    850,000
     8             (BASE PROJECT ALLOCATION - $850,000)
     9  SECTION 11.  ITEMIZATION OF PUBLIC HIGHWAY PROJECTS.
    10     ADDITIONAL CAPITAL PROJECTS IN THE CATEGORY OF PUBLIC HIGHWAY
    11  PROJECTS TO BE CONSTRUCTED BY THE DEPARTMENT OF TRANSPORTATION,
    12  ITS SUCCESSORS OR ASSIGNS, AND TO BE FINANCED BY THE INCURRING
    13  OF DEBT, OR FROM CURRENT REVENUES OF THE MOTOR LICENSE FUND, ARE
    14  HEREBY ITEMIZED, TOGETHER WITH THEIR RESPECTIVE ESTIMATED
    15  FINANCIAL COSTS, AS FOLLOWS:
    16                                                           TOTAL  
    17                                                          PROJECT 
    18             PROJECT                                    ALLOCATION
    19  (1)  ADAMS COUNTY
    20     (I)  S.R.0034
    21         (A)  MAIN STREET INTERSECTION WITH PA 234,
    22             YORK STREET, BIGLERVILLE BOROUGH              105,000
    23             (BASE PROJECT ALLOCATION - $30,000)
    24             (LAND ALLOCATION - $10,000)
    25             (DESIGN AND CONTINGENCIES - $65,000)
    26     (II)  S.R.0094
    27         (A)  MAIN STREET INTERSECTION WITH IDAVILLE
    28             ROAD, YORK SPRINGS BOROUGH AND
    29             HUNTINGTON TOWNSHIP                           250,000
    30             (BASE PROJECT ALLOCATION - $50,000)
    19990H1023B3629                 - 65 -

     1             (LAND ALLOCATION - $100,000)
     2             (DESIGN AND CONTINGENCIES - $100,000)
     3     (III)  S.R.0097
     4         (A)  QUEEN STREET INTERSECTION WITH PA 194,
     5             KING STREET, LITTLESTOWN BOROUGH               87,000
     6             (BASE PROJECT ALLOCATION - $12,000)
     7             (LAND ALLOCATION - $10,000)
     8             (DESIGN AND CONTINGENCIES - $65,000)
     9     (IV)  S.R.0015
    10         (A)  PAVEMENT RESTORATION, BRIDGE
    11             REHABILITATION AND SAFETY IMPROVEMENTS,
    12             MARYLAND STATE LINE TO YORK COUNTY
    13             LINE                                        6,100,000
    14             (BASE PROJECT ALLOCATION - $6,000,000)
    15             (DESIGN AND CONTINGENCIES - $100,000)
    16     (V)  EISENHOWER DRIVE
    17         (A)  REHABILITATION AND IMPROVEMENT OF
    18             EISENHOWER DRIVE FROM HIGH STREET TO
    19             OXFORD AVENUE                                 900,000
    20         (B)  REHABILITATION AND IMPROVEMENT OF
    21             EISENHOWER DRIVE FROM OXFORD AVENUE TO
    22             PA 116                                      1,270,000
    23     (VI)  PA 94
    24         (A)  SAFETY IMPROVEMENTS TO BOLLINGER AND
    25             MEHRING ROAD INTERCHANGE                      200,000
    26     (VII)  U.S.30
    27         (A)  U.S.30/U.S.15 INTERCHANGE, INTERCHANGE
    28             IMPROVEMENT                                 1,850,000
    29             (BASE PROJECT ALLOCATION - $1,600,000)
    30             (LAND ALLOCATION - $100,000)
    19990H1023B3629                 - 66 -

     1             (DESIGN AND CONTINGENCIES - $150,000)
     2  (2)  ALLEGHENY COUNTY
     3     (I)  S.R.0019
     4         (A)  U.S.19 ABBEYVILLE ROAD EXTENSION,
     5             UPPER SAINT CLAIR TOWNSHIP                    935,000
     6         (B)  ADD INTERSECTION AND CONNECTOR ON WEST
     7             SIDE OF S.R.0019 AT ABBEYVILLE ROAD           900,000
     8         (C)  U.S.19 AND HIGHLAND AVENUE
     9             INTERSECTION, TURNING LANES AND
    10             SIGNALS                                       589,000
    11             (BASE PROJECT ALLOCATION - $194,000)
    12             (LAND ALLOCATION - $275,000)
    13             (DESIGN AND CONTINGENCIES - $120,000)
    14         (D)  U.S.19 FROM S.R.0051 JUNCTION TO
    15             S.R.0065 SPLIT, PAVEMENT RESTORATION,
    16             BRIDGE REHABILITATION AND SAFETY
    17             IMPROVEMENTS                                  350,000
    18             (BASE PROJECT ALLOCATION - $300,000)
    19             (DESIGN AND CONTINGENCIES - $50,000)
    20         (E)  U.S.19 TRUCK ROUTE FROM S.R.4070 NORTH
    21             TO U.S.19, PAVEMENT AND RESTORATION,
    22             BRIDGE REHABILITATION AND SAFETY
    23             IMPROVEMENTS                                  150,000
    24             (BASE PROJECT ALLOCATION - $100,000)
    25             (DESIGN AND CONTINGENCIES - $50,000)
    26         (F)  U.S.19 TRUCK ROUTE FROM I-279 TO
    27             S.R.8079, PAVEMENT RESTORATION, BRIDGE
    28             REHABILITATION AND SAFETY IMPROVEMENTS        250,000
    29             (BASE PROJECT ALLOCATION - $200,000)
    30             (DESIGN AND CONTINGENCIES - $50,000)
    19990H1023B3629                 - 67 -

     1         (G)  U.S.19 PINE CREEK HILL TO WALLACE
     2             ROAD, PINE AND MCCANDLESS TOWNSHIPS,
     3             RESTORATION                                   867,000
     4             (BASE PROJECT ALLOCATION - $867,000)
     5         (H)  U.S.19 WEST END BYPASS TO WEST END
     6             BRIDGE, CITY OF PITTSBURGH, NEW
     7             ROADWAY                                     4,000,000
     8             (BASE PROJECT ALLOCATION - $4,000,000)
     9         (I)  U.S.19 GATESHEAD/HIDDEN VALLEY
    10             INTERSECTION, PETERS TOWNSHIP,
    11             CONSTRUCTION COSTS, NEW TRAFFIC
    12             SIGNALS                                       400,000
    13     (II)  S.R.0060
    14         (A)  IMPROVEMENTS TO ROBINSON TOWN CENTRE
    15             BOULEVARD AND MONTOUR CHURCH ROAD AND
    16             THEIR INTERSECTION WITH S.R.60 AND
    17             U.S.22/30, ROBINSON TOWNSHIP AND NORTH
    18             FAYETTE TOWNSHIP                            5,224,000
    19             (BASE PROJECT ALLOCATION - $3,174,000)
    20             (LAND ALLOCATION - $1,600,000)
    21             (DESIGN AND CONTINGENCIES - $450,000)
    22         (B)  S.R.0060 FROM U.S.22 TO BEAVER COUNTY
    23             LINE, PAVEMENT RESTORATION, BRIDGE
    24             REHABILITATION AND SAFETY IMPROVEMENTS      1,450,000
    25             (BASE PROJECT ALLOCATION - $1,400,000)
    26             (DESIGN AND CONTINGENCIES - $50,000)
    27         (C)  CONSTRUCTION OF ENLOW INTERCHANGE AND
    28             ACCESS ROAD, FINDLAY TOWNSHIP              23,500,000
    29             (BASE PROJECT ALLOCATION - $19,000,000)
    30             (DESIGN AND CONTINGENCIES - $4,500,000)
    19990H1023B3629                 - 68 -

     1         (D)  S.R.0060 BUSINESS ROUTE, FROM
     2             S.R.0060/S.R.6060 JUNCTION TO
     3             S.R.6060/S.R.0060 JUNCTION, PAVEMENT
     4             RESTORATION, BRIDGE REHABILITATION AND
     5             SAFETY IMPROVEMENTS                           850,000
     6             (BASE PROJECT ALLOCATION - $800,000)
     7             (DESIGN AND CONTINGENCIES - $50,000)
     8         (E)  PA 60 INTERSECTION OF PA 60 AND
     9             CHURCHILL, ROBINSON TOWNSHIP, SAFETY
    10             IMPROVEMENT                                    25,000
    11             (BASE PROJECT ALLOCATION - $25,000)
    12         (F)  PA 60 FLAUGHERTY RUN INTERCHANGE TO
    13             BEAVER COUNTY LINE, FINDLAY AND MOON
    14             TOWNSHIPS, RECONSTRUCTION                   2,256,000
    15             (BASE PROJECT ALLOCATION - $2,256,000)
    16         (G)  WIDEN NORTHBOUND S.R.0060 FROM ENLOW
    17             ROAD OVERPASS TO FLAUGHERTY RUN EXIT
    18             RAMP                                        6,600,000
    19             (BASE PROJECT ALLOCATION - $6,000,000)
    20             (DESIGN AND CONTINGENCIES - $600,000)
    21         (H)  MOON CLINTON ROAD/S.R.0060
    22             INTERCHANGE, ADD RAMPS AND RELOCATE
    23             EXISTING RAMP TO IMPROVE ACCESS TO
    24             S.R.0060 AND PITTSBURGH INTERNATIONAL
    25             AIRPORT                                     8,500,000
    26             (BASE PROJECT ALLOCATION - $7,000,000)
    27             (DESIGN AND CONTINGENCIES - $1,500,000)
    28         (I)  WIDEN MOON CLINTON ROAD AND EXIT RAMP
    29             TERMINALS 0.5 MILES WEST OF S.R.0060 TO
    30             500 FEET EAST OF S.R.0060 BUSINESS         17,500,000
    19990H1023B3629                 - 69 -

     1             (BASE PROJECT ALLOCATION - $15,000,000)
     2             (DESIGN AND CONTINGENCIES - $2,500,000)
     3     (III)  S.R.0065
     4         (A)  WEST END BRIDGE, NORTH APPROACH TO
     5             S.R.0065                                    1,325,000
     6             (BASE PROJECT ALLOCATION - $1,325,000)
     7         (B)  S.R.0065 FROM U.S.19 TO S.R.3104,
     8             PAVEMENT RESTORATION, BRIDGE
     9             REHABILITATION AND SAFETY IMPROVEMENTS        250,000
    10             (BASE PROJECT ALLOCATION - $200,000)
    11             (DESIGN AND CONTINGENCIES - $50,000)
    12     (IV)  S.R.0079
    13         (A)  I-79 RECONSTRUCTION FROM REST AREA TO
    14             KIRWAN HEIGHTS, SOUTH FAYETTE TOWNSHIP
    15             AND BRIDGEVILLE BOROUGH                     1,510,000
    16             (BASE PROJECT ALLOCATION - $1,510,000)
    17         (B)  I-79 FROM WASHINGTON COUNTY LINE TO
    18             BUTLER COUNTY LINE, PAVEMENT
    19             RESTORATION, BRIDGE REHABILITATION AND
    20             SAFETY IMPROVEMENTS                         2,850,000
    21             (BASE PROJECT ALLOCATION - $2,800,000)
    22             (DESIGN AND CONTINGENCIES - $50,000)
    23         (C)  INTERCHANGE AT I-79/PARKWAY AND PENN
    24             CENTER WEST INTERCHANGE AT CAMPBELL'S
    25             RUN ROAD, COLLIER AND ROBINSON
    26             TOWNSHIPS                                  50,000,000
    27             (BASE PROJECT ALLOCATION - $32,000,000)
    28             (LAND ALLOCATION - $12,000,000)
    29             (DESIGN AND CONTINGENCIES - $6,000,000)
    30         (D)  I-79, RAMP E, SOUTH FAYETTE
    19990H1023B3629                 - 70 -

     1             TOWNSHIP/BRIDGEVILLE INTERCHANGE,
     2             RECONSTRUCTION                              1,008,000
     3             (BASE PROJECT ALLOCATION - $1,008,000)
     4         (E)  I-79,PARKWAY WEST, CONSTRUCTION OF
     5             MISSING RAMPS FROM I-79 SOUTHBOUND TO
     6             PARKWAY WEST S.R.0060 AND PARKWAY WEST
     7             EASTBOUND TO I-79 NORTH                    70,000,000
     8         (F)  I-79 WARRENDALE
     9             INTERCHANGE/WARRENDALE/BAYNE ROAD,
    10             DEVELOP PARTNERSHIP FOR HIGHWAY
    11             IMPROVEMENTS TO ENABLE SITE DEVELOPMENT
    12             FOR TECH 21 TECHNOLOGY PARK                15,000,000
    13     (V)  S.R.0279
    14         (A)  I-279, PENN CENTER WEST INTERCHANGE
    15             WITH CAMPBELLS RUN ROAD, COLLIER
    16             TOWNSHIP AND ROBINSON TOWNSHIP             29,000,000
    17             (BASE PROJECT ALLOCATION - $19,500,000)
    18             (LAND ALLOCATION - $7,000,000)
    19             (DESIGN AND CONTINGENCIES - $2,500,000)
    20         (B)  I-279 FROM I-79 (PENN LINCOLN PARKWAY)
    21             TO I-79 IN NORTHERN ALLEGHENY COUNTY,
    22             PAVEMENT RESTORATION, BRIDGE
    23             REHABILITATION AND SAFETY IMPROVEMENTS      1,050,000
    24             (BASE PROJECT ALLOCATION - $1,000,000)
    25             (DESIGN AND CONTINGENCIES - $50,000)
    26         (C)  I-279, SOUND BARRIERS FROM VENTURE
    27             STREET EXIT NORTH TO THE PITTSBURGH
    28             CITY LINE, CITY OF PITTSBURGH               2,000,000
    29         (D)  I-279, FORT PITT BRIDGE TO CAMP HORN
    30             ROAD, CITY OF PITTSBURGH AND ROSS
    19990H1023B3629                 - 71 -

     1             TOWNSHIP, SAFETY IMPROVEMENT/FREEWAY
     2             SURVEILLANCE                                   60,000
     3             (DESIGN AND CONTINGENCIES - $60,000)
     4         (E)  I-279/ANNER STREET SLIDE, CITY OF
     5             PITTSBURGH, SLOPE IMPROVEMENT                  59,000
     6             (BASE PROJECT ALLOCATION - $35,000)
     7             (LAND ALLOCATION - $2,000)
     8             (DESIGN AND CONTINGENCIES - $22,000)
     9         (F)  I-279, RETAINING WALL NUMBER 4, CITY
    10             OF PITTSBURGH, SLOPE STABILIZATION            161,000
    11             (BASE PROJECT ALLOCATION - $120,000)
    12             (LAND ALLOCATION - $15,000)
    13             (DESIGN AND CONTINGENCIES - $26,000)
    14         (G)  I-279, ANNER STREET SLIDE, CITY OF
    15             PITTSBURGH, RECONSTRUCTION                    100,000
    16             (BASE PROJECT ALLOCATION - $100,000)
    17         (H)  I-279, RETAINING WALL NUMBER 4, CITY
    18             OF PITTSBURGH, RECONSTRUCTION                 180,000
    19             (BASE PROJECT ALLOCATION - $180,000)
    20         (I)  I-279, FT. PITT BRIDGE TO CAMP HORN
    21             ROAD, CITY OF PITTSBURGH AND ROSS
    22             TOWNSHIP, SAFETY IMPROVEMENT                  330,000
    23             (BASE PROJECT ALLOCATION - $330,000)
    24     (VI)  S.R.0837
    25         (A)  WATERFRONT IMPROVEMENTS TO S.R.0837
    26             FROM 8TH AVENUE TO EAST DRIVE, WEST
    27             HOMESTEAD BOROUGH, HOMESTEAD BOROUGH
    28             AND MUNHALL BOROUGH                           587,000
    29         (B)  S.R.0837 FROM DUQUESNE TO MUNHALL,
    30             PAVEMENT RESTORATION, BRIDGE
    19990H1023B3629                 - 72 -

     1             REHABILITATION AND SAFETY IMPROVEMENTS        250,000
     2             (BASE PROJECT ALLOCATION - $200,000)
     3             (DESIGN AND CONTINGENCIES - $50,000)
     4         (C)  PA 837, 8TH AVENUE TO EAST DRIVE, WEST
     5             HOMESTEAD, HOMESTEAD AND MUNHALL
     6             BOROUGHS, SAFETY IMPROVEMENT                  117,000
     7             (BASE PROJECT ALLOCATION - $117,000)
     8         (D)  PA 837, PARRY STREET TO WITAKER WAY,
     9             WEST HOMESTEAD, HOMESTEAD AND MUNHALL
    10             BOROUGHS, SAFETY IMPROVEMENT                  146,000
    11             (BASE PROJECT ALLOCATION - $146,000)
    12         (E)  WIDEN S.R.0837 FROM RAVINE ST. AREA IN
    13             MUNHALL TO EAST FLYOVER BRIDGE AND
    14             CONTINUING TO THE WHITAKER/RANKIN
    15             BRIDGE                                      6,000,000
    16     (VII)  S.R.3004
    17         (A)  INTERSECTION IMPROVEMENTS WITH
    18             S.R.3034 AND LESNETT ROAD                   2,500,000
    19     (VIII)  S.R.3004 AND S.R.3009
    20         (A)  WIDEN MCMURRAY ROAD TO 3 LANES FROM
    21             SOUTH PARK ROAD AND CLIFTON ROAD AND
    22             WIDEN APPROACHES AT SOUTH PARK ROAD AND
    23             CLIFTON ROAD                                2,800,000
    24     (IX)  S.R.3006
    25         (A)  IMPROVEMENTS TO BOYCE ROAD FROM
    26             S.R.0019 TO S.R.3005                        2,800,000
    27     (X)  S.R.3009 AND S.R.2040
    28         (A)  INTERSECTION AND APPROACH
    29             IMPROVEMENTS                                2,000,000
    30     (XI)  S.R.3036
    19990H1023B3629                 - 73 -

     1         (A)  INTERSECTION IMPROVEMENTS WITH
     2             S.R.3034                                      850,000
     3     (XII) S.R.3103
     4         (A)  WIDEN AND INTERSECTION IMPROVEMENTS
     5             FOR MCKEE ROAD, NORTH FAYETTE TOWNSHIP        900,000
     6     (XIII)  S.R.3160
     7         (A)  GRADE-SEPARATED INTERCHANGE AT BEERS
     8             SCHOOL ROAD AND S.R.60, MOON TOWNSHIP       5,000,000
     9             (LAND ALLOCATION - $1,000,000)
    10             (DESIGN AND CONTINGENCIES - $4,000,000)
    11         (B)  DIRECTIONAL INTERCHANGE AT FLAUGHERTY
    12             RUN ROAD, MOON TOWNSHIP                    18,000,000
    13             (BASE PROJECT ALLOCATION - $15,000,000)
    14             (DESIGN AND CONTINGENCIES - $3,000,000)
    15     (XIV)  LOCAL ROAD CONNECTOR
    16         (A)  CONSTRUCT NEW ROAD FROM INTERSECTION
    17             OF S.R.3005 AND S.R.3006 TO INTERCHANGE
    18             OF THE SOUTHERN BELTWAY AND I-79           30,000,000
    19     (XV)  S.R.0028
    20         (A)  DEVELOPMENT OF A CONNECTOR ROAD FROM
    21             S.R.0028 TO ROCK AIRPORT, TARENTUM
    22             BOROUGH, EAST DEER TOWNSHIP, INDIANA
    23             TOWNSHIP AND WEST DEER TOWNSHIP             3,000,000
    24             (BASE PROJECT ALLOCATION - $2,000,000)
    25             (LAND ALLOCATION - $500,000)
    26             (DESIGN AND CONTINGENCIES - $500,000)
    27         (B)  S.R.0028 FROM ETNA TO BUTLER COUNTY
    28             LINE, PAVEMENT RESTORATION, BRIDGE
    29             REHABILITATION AND SAFETY IMPROVEMENTS      2,350,000
    30             (BASE PROJECT ALLOCATION - $2,300,000)
    19990H1023B3629                 - 74 -

     1             (DESIGN AND CONTINGENCIES - $50,000)
     2         (C)  EAST OHIO RELOCATION, MILLVALE BOROUGH
     3             WALL ALONG ROUTE 28 AT MILLVALE
     4             INTERCHANGE                                 1,805,000
     5             (BASE PROJECT ALLOCATION - $1,020,000)
     6             (DESIGN AND CONTINGENCIES - $785,000)
     7         (D)  PA 28 SOUTHBOUND FROM HIGHLAND PARK
     8             BRIDGE TO RAVINE STREET, RESTORATION          400,000
     9             (BASE PROJECT ALLOCATION - $400,000)
    10         (E)  PA 28 NORTHBOUND FROM RAVINE STREET TO
    11             HIGHLAND PARK, SHARPSBURG BOROUGH,
    12             RESTORATION                                   400,000
    13             (BASE PROJECT ALLOCATION - $400,000)
    14         (F)  PA 28 HIGHLAND PARK BRIDGE TO
    15             DELAFIELD, ASPINWALL BOROUGH,
    16             RECONSTRUCTION                                120,000
    17             (BASE PROJECT ALLOCATION - $120,000)
    18     (XVI)  S.R.0022
    19         (A)  U.S.22 FROM CARNEGIE TO OHIO STATE
    20             LINE, PAVEMENT RESTORATION, BRIDGE
    21             REHABILITATION AND SAFETY IMPROVEMENTS        850,000
    22             (BASE PROJECT ALLOCATION - $800,000)
    23             (DESIGN AND CONTINGENCIES - $50,000)
    24     (XVII)  S.R.0376
    25         (A)  I-376 FROM I-279 TO THE PENNSYLVANIA
    26             TURNPIKE, PAVEMENT RESTORATION, BRIDGE
    27             REHABILITATION AND SAFETY IMPROVEMENTS      1,550,000
    28             (BASE PROJECT ALLOCATION - $1,500,000)
    29             (DESIGN AND CONTINGENCIES - $50,000)
    30         (B)  I-376, GRANT STREET TO GREENSBURG
    19990H1023B3629                 - 75 -

     1             PIKE, CITY OF PITTSBURGH AND EDGEWOOD
     2             AND BRADDOCK HILLS BOROUGHS,
     3             RECONSTRUCTION                              2,512,000
     4             (BASE PROJECT ALLOCATION - $2,512,000)
     5     (XVIII)  S.R.0579
     6         (A)  I-579 FROM I-279 TO THE PENNSYLVANIA
     7             TURNPIKE, PAVEMENT RESTORATION, BRIDGE
     8             REHABILITATION AND SAFETY IMPROVEMENTS        250,000
     9             (BASE PROJECT ALLOCATION - $200,000)
    10             (DESIGN AND CONTINGENCIES - $50,000)
    11     (XIX)  S.R.3070
    12         (A)  EXTENSION OF INDUSTRY DRIVE BETWEEN
    13             MCCLAREN ROAD AND ENLOW ROAD, FINDLAY
    14             TOWNSHIP                                    8,125,000
    15             (BASE PROJECT ALLOCATION - $6,000,000)
    16             (LAND ALLOCATION - $1,000,000)
    17             (DESIGN AND CONTINGENCIES - $1,125,000)
    18         (B)  WIDEN, SAFETY IMPROVEMENTS, UPGRADE
    19             MCCLAREN ROAD (S.R.3070) FROM MCCLAREN
    20             INTERCHANGE (S.R.0060) TO VILLAGE OF
    21             ENLOW WITH IMPROVEMENTS TO THE FIVE-
    22             POINT INTERSECTION AT ENLOW                 8,000,000
    23     (XX)  S.R.2082
    24         (A)  OAKMONT AND PLUM BOROUGHS, WIDENING
    25             AND RESTORATION OF HULTON ROAD FROM THE
    26             HULTON BRIDGE TO S.R.2058                   3,000,000
    27             (BASE PROJECT ALLOCATION - $2,500,000)
    28             (DESIGN AND CONTINGENCIES - $500,000)
    29     (XXI)  INTELLIGENT TRANSPORTATION SYSTEMS
    30         (A)  INSTALLATION OF INTELLIGENT
    19990H1023B3629                 - 76 -

     1             TRANSPORTATION SYSTEMS AT VARIOUS AREAS
     2             WITHIN THE PITTSBURGH REGIONAL AREA           500,000
     3     (XXII)  PA 65
     4         (A)  PA 65 FROM GRANT TO RIVERVIEW,
     5             BELLEVUE BOROUGH, WIDEN ROADWAY,              722,000
     6             (BASE PROJECT ALLOCATION - $580,000)
     7             (LAND ALLOCATION - $95,000)
     8             (DESIGN AND CONTINGENCIES - $47,000)
     9     (XXIII)  NEW MON RIVER BRIDGE
    10         (A)  FROM WABASH TUNNEL TO STANWIX, CITY OF
    11             PITTSBURGH, NEW BRIDGE                     32,400,000
    12             (BASE PROJECT ALLOCATION - $24,000,000)
    13             (LAND ALLOCATION - $2,000,000)
    14             (DESIGN AND CONTINGENCIES - $6,400,000)
    15     (XXIV)  SOUTH MILLVALE STREET BRIDGE
    16         (A)  OVER EAST BUSWAY/CONRAIL, CITY OF
    17             PITTSBURGH, BRIDGE REHABILITATION           1,000,000
    18             (BASE PROJECT ALLOCATION - $1,000,000)
    19     (XXV)  BANKSVILLE CONNECTION
    20         (A)  FROM WABASH TUNNEL TO BANKSVILLE, CITY
    21             OF PITTSBURGH, NEW ROADWAY                 11,000,000
    22             (BASE PROJECT ALLOCATION - $10,000,000)
    23             (DESIGN AND CONTINGENCIES - $1,000,000)
    24     (XXVI)  S.R.9900
    25         (A)  NORTH FAYETTE TOWNSHIP, NEW ROADWAY
    26             AND RECONSTRUCTION OF PITTSBURGH
    27             TECHNOLOGY INSTITUTE ACCESS ROAD              900,000
    28     (XXVII)  SUMMIT PARK DRIVE
    29         (A)  SUMMIT PARK DRIVE/ROBINSON TOWN CENTER
    30             BOULEVARD INTERCHANGE, NORTH FAYETTE
    19990H1023B3629                 - 77 -

     1             TOWNSHIP, SAFETY IMPROVEMENT/ADD TURN
     2             LANE                                          288,000
     3             (BASE PROJECT ALLOCATION - $288,000)
     4     (XXVIII)  PA 885
     5         (A)  LIBERTY BRIDGE TO PARKWAY WEST, CITY
     6             OF PITTSBURGH, RESTORATION                  1,222,000
     7             (BASE PROJECT ALLOCATION - $1,222,000)
     8         (B)  LEBANON CHURCH ROAD S.R.2040 TO
     9             MIFFLIN ROAD S.R.2045 TO ACCOMMODATE
    10             ADTRANZ, WATERFRONT AND OTHER
    11             DEVELOPMENT                                 5,000,000
    12         (C)  S.R.0885 RECONSTRUCTION, IMPROVEMENT
    13             UPGRADES TO S.R.0885 BETWEEN LEBANON
    14             CHURCH ROAD (S.R.2040) AND JUNCTION OF
    15             MIFFLIN ROAD (S.R.2045) AND S.R.0885 TO
    16             ACCOMMODATE ADTRANZ, WATERFRONT AND
    17             OTHER SIGNIFICANT DEVELOPMENT AND
    18             EXPANSION IN THE MON VALLEY                 3,000,000
    19     (XXIX)  S.R.1019
    20         (A)  ACCESS ROAD FROM S.R.1019 (BUTLER
    21             LOGAN AIRPORT ROAD) TO ROCK AIRPORT,
    22             WEST DEER TOWNSHIP                            500,000
    23             (BASE PROJECT ALLOCATION - $470,000)
    24             (DESIGN AND CONTINGENCIES - $30,000)
    25     (XXX)  PA 910
    26         (A)  I-79 INTERCHANGE WITH PA 910, MARSHALL
    27             TOWNSHIP, RECONSTRUCTION                      301,000
    28             (BASE PROJECT ALLOCATION - $301,000)
    29     (XXXI)  S.R.3056
    30         (A)  CHESTNUT STREET, CARNEGIE BOROUGH,
    19990H1023B3629                 - 78 -

     1             SAFETY IMPROVEMENT                             70,000
     2             (BASE PROJECT ALLOCATION - $70,000)
     3     (XXXII)  S.R.0060/S.R.0022/S.R.0030
     4         (A)  S.R.0060/S.R.0022/S.R.0030,
     5             FEASIBILITY STUDY TO PROVIDE INTERSTATE
     6             HIGHWAY DESIGNATION TO PITTSBURGH
     7             INTERNATIONAL AIRPORT FROM REGIONAL
     8             HIGHWAYS                                    1,000,000
     9     (XXXIII)  KIRWAN HEIGHTS INTERCHANGE
    10         (A)  KIRWAN HEIGHTS INTERCHANGE,
    11             IMPROVEMENTS, CONNECTION TO THOMAS RUN
    12             ROAD, IMPROVEMENTS TO S.R.0050
    13             INTERSECTION                                9,000,000
    14     (XXXIV)  ROCK AIRPORT INDUSTRIAL PARK
    15         (A)  ROCK AIRPORT INDUSTRIAL PARK, ACCESS
    16             ROAD, FROM LITTLE DEER CREEK ROAD,
    17             S.R.1015 TO RUSSELTON AIRPORT ROAD          6,000,000
    18     (XXXV)  BAPTIST ROAD/BROUGHTON ROAD/HORNING
    19         CORRIDOR
    20         (A)  BAPTIST ROAD/BROUGHTON ROAD/ROUTE 88/
    21             HORNING ROAD, BAPTIST ROAD AND
    22             BROUGHTON ROAD, CONSTRUCTION OF TURNING
    23             LANES AND INCREASE OF STORAGE LENGTH,
    24             BAPTIST AND HORNING ROAD AND ROUTE 88
    25             AND BROUGHTON ROAD, OPTIMIZING TRAFFIC
    26             SIGNAL TIMINGS, ROUTE 88 AND HORNING
    27             ROAD, PROTECTED TURN PHASES AND
    28             OPTIMIZE TRAFFIC SIGNAL TIMINGS             1,200,000
    29     (XXXVI)  LEBANON CHURCH ROAD
    30         (A)  INTERSECTIONS OF LEBANON CHURCH ROAD
    19990H1023B3629                 - 79 -

     1             AND CLOVE DRIVE, LEBANON CHURCH ROAD
     2             AND RICHALLER DRIVE, PLEASANT HILLS
     3             BOROUGH, CONSTRUCT LEFT-HAND TURN LANE,
     4             ADDING TRAFFIC SIGNS AND SIGNALS            4,000,000
     5     (XXXVII)  COCHRAN ROAD
     6         (A)  INTERSECTIONS OF COCHRAN ROAD AND
     7             BEVERLY ROAD, MOUNT LEBANON TOWNSHIP,
     8             RELINE TO CREATE LEFT-HAND TURN LANE,
     9             REPLACE TRAFFIC SIGNAL, INSTALL
    10             FIBEROPTIC INTERCONNECTING SIGNAL
    11             SYSTEMS                                       120,000
    12     (XXXVIII)  MOON-CLINTON ROAD
    13         (A)  S.R.0060 TO S.R.0030 UPGRADE, WIDEN
    14             AND STRAIGHTEN                              5,000,000
    15             (BASE PROJECT ALLOCATION - $3,000,000)
    16             (DESIGN AND CONTINGENCIES - $2,000,000)
    17     (XXXIX)  CHERRINGTON PARKWAY
    18         (A)  EXTEND CHERRINGTON BUSINESS PARK
    19             INTERNAL ACCESS ROAD THROUGH PITTSBURGH
    20             INTERNATIONAL AIRPORT PROPERTY TO EWING
    21             ROAD AND NEW INTERCHANGE AT S.R.0060
    22             (BUSINESS)                                  3,000,000
    23     (XL)  S.R.3107
    24         (A)  WIDEN, SIGNALIZATION AND SAFETY
    25             IMPROVEMENTS TO EWING ROAD (S.R.3107)
    26             AT NEW INTERCHANGE WITH S.R.0060
    27             (BUSINESS)                                  2,000,000
    28     (XLI)  MCCLAREN ROAD AREA
    29         (A)  INTERNAL ACCESS ROAD FROM RIDC PARK
    30             TERMINUS OF INDUSTRY DRIVE TO MCCLAREN
    19990H1023B3629                 - 80 -

     1             ROAD (S.R.3070) AND MCCLAREN
     2             INTERCHANGE ON S.R.0060                     5,000,000
     3     (XLII)  MCKEES ROCKS ACCESS ROAD
     4         (A)  NEW ACCESS ROAD FROM ROUTE 51 AT WEST
     5             CARSON STREET INTERSECTION TO STOWE
     6             TOWNSHIP TO OPEN SITES FOR
     7             REDEVELOPMENT                               6,250,000
     8     (XLIII)  AIRPORT MULTI-MODAL TRANSPORTATION
     9  CORRIDOR
    10         (A)  MULTI-USE TOLL FACILITY FEASIBILITY
    11             STUDY TO RELIEVE PARKWAY WEST. PROJECT
    12             FROM S.R.0060/MONTOUR INTERCHANGE TO
    13             PITTSBURGH CENTRAL BUSINESS DISTRICT
    14             VIA ROBINSON-KENNEDY-STOWE-MCKEES
    15             ROCKS-BRUNOT ISLAND AND S.R.0065 ON THE
    16             NORTH SHORE                                 1,000,000
    17  (3)  ARMSTRONG COUNTY
    18     (I)  S.R.3017
    19         (A)  INTERSECTION OF S.R.3017 AND PA 28,
    20             SOUTH BUFFALO TOWNSHIP, SAFETY
    21             IMPROVEMENT/ADD LANE                          567,000
    22             (BASE PROJECT ALLOCATION - $500,000)
    23             (LAND ALLOCATION - $10,000)
    24             (DESIGN AND CONTINGENCIES - $57,000)
    25     (II)  PA 156
    26         (A)  INTERSECTION OF PA 156 AND PA 210,
    27             SOUTH BEND TOWNSHIP, SAFETY
    28             IMPROVEMENT                                   160,000
    29             (BASE PROJECT ALLOCATION - $120,000)
    30             (LAND ALLOCATION - $10,000)
    19990H1023B3629                 - 81 -

     1             (DESIGN AND CONTINGENCIES - $30,000)
     2     (III)  PA 268
     3         (A)  PINE STREET TO CEDAR DRIVE, EAST
     4             FRANKLIN TOWNSHIP, SAFETY IMPROVEMENT         346,000
     5             (BASE PROJECT ALLOCATION - $240,000)
     6             (LAND ALLOCATION - $50,000)
     7             (DESIGN AND CONTINGENCIES - $56,000)
     8         (B)  INTERSECTION OF PA 268 AND MALL
     9             ENTRANCE, EAST FRANKLIN TOWNSHIP,
    10             SAFETY IMPROVEMENT                            176,000
    11             (BASE PROJECT ALLOCATION - $140,000)
    12             (LAND ALLOCATION - $5,000)
    13             (DESIGN AND CONTINGENCIES - $31,000)
    14     (IV)  WETLAND BANKING
    15         (A)  COUNTYWIDE, RECONSTRUCTION OF WETLAND
    16             BANKING                                        84,000
    17             (BASE PROJECT ALLOCATION - $40,000)
    18             (LAND ALLOCATION - $20,000)
    19             (DESIGN AND CONTINGENCIES - $24,000)
    20  (4)  BEAVER COUNTY
    21     (I)  S.R.0051/S.R.0065
    22         (A)  S.R.0051/S.R.0065 FROM FREEDOM BOROUGH
    23             TO BRIDGEWATER BOROUGH, PAVEMENT
    24             RESTORATION, BRIDGE REHABILITATION AND
    25             SAFETY IMPROVEMENTS                           350,000
    26             (BASE PROJECT ALLOCATION - $300,000)
    27             (DESIGN AND CONTINGENCIES - $50,000)
    28     (II)  S.R.0060
    29         (A)  S.R.0060 FROM ALLEGHENY COUNTY LINE TO
    30             LAWRENCE COUNTY LINE, PAVEMENT
    19990H1023B3629                 - 82 -

     1             RESTORATION, BRIDGE REHABILITATION AND
     2             SAFETY IMPROVEMENTS                         1,850,000
     3             (BASE PROJECT ALLOCATION - $1,800,000)
     4             (DESIGN AND CONTINGENCIES - $50,000)
     5         (B)  PA 60, BEAVER AND ALLEGHENY COUNTY
     6             LINE TO PA 151 INTERCHANGE, HOPEWELL
     7             TOWNSHIP, RECONSTRUCTION                    2,059,000
     8             (BASE PROJECT ALLOCATION - $2,059,000)
     9         (C)  PA 60, PA 151 INTERCHANGE TO GREEN
    10             GARDEN INTERCHANGE, HOPEWELL TOWNSHIP,
    11             RECONSTRUCTION                              2,765,000
    12             (BASE PROJECT ALLOCATION - $2,765,000)
    13         (D)  PA 60, GREEN GARDEN ROAD TO CENTER
    14             EXIT, HOPEWELL AND CENTER TOWNSHIPS,
    15             RECONSTRUCTION                              7,450,000
    16             (BASE PROJECT ALLOCATION - $7,450,000)
    17     (III)  S.R.9900
    18         (A)  CONSTRUCTION OF WOODLAWN AVENUE
    19             EXTENSION IN CITY OF ALIQUIPPA                300,000
    20             (BASE PROJECT ALLOCATION - $280,000)
    21             (DESIGN AND CONTINGENCIES - $20,000)
    22     (IV)  LOGAN LANE
    23         (A)  WIDEN ROADWAY BETWEEN S.R.2001 AND
    24             S.R.0065, HARMONY TOWNSHIP                  1,500,000
    25     (V)  S.R.0168
    26         (A)  RECONSTRUCTION AND IMPROVEMENTS
    27             BETWEEN S.R.0018 AND S.R.0030, HANOVER
    28             AND GREENE TOWNSHIPS                       10,000,000
    29     (VI)  S.R.0288
    30         (A)  WIDENING AND IMPROVEMENTS, INCLUDING
    19990H1023B3629                 - 83 -

     1             THE REMOVAL OF DANGEROUS TURNS            200,000,000
     2     (VII)  S.R.0588
     3         (A)  RESURFACING AND IMPROVEMENTS TO
     4             HIGHWAY                                    50,000,000
     5     (VIII)  PENNSYLVANIA TURNPIKE
     6         (A)  CONSTRUCTION OF AN EXIT RAMP ON
     7             CONCORD CHURCH ROAD, (S.R.0588) NORTH
     8             SEWICKLEY TOWNSHIP                         35,000,000
     9     (IX)  PA 151
    10         (A)  PA 151 FROM KANE ROAD AT GRINGO ROAD,
    11             HOPEWELL TOWNSHIP, RELOCATION                 300,000
    12             (BASE PROJECT ALLOCATION - $260,000)
    13             (LAND ALLOCATION - $40,000)
    14     (X)  PA 51
    15         (A)  ROCHESTER-MONACA BRIDGE TO ALIQUIPPA-
    16             AMBRIDGE BRIDGE, CITY OF ALIQUIPPA,
    17             RECONSTRUCTION                              3,000,000
    18             (BASE PROJECT ALLOCATION - $3,000,000)
    19         (B)  EXTENSION OF WOODLAWN ROAD EXTENSION,
    20             PA 51, FROM FRANKLIN AVENUE, CITY OF
    21             ALIQUIPPA                                   3,000,000
    22             (BASE PROJECT ALLOCATION - $3,000,000)
    23     (XI)  PA 65
    24         (A)  STATE STREET TO PA 51, HARMONY
    25             TOWNSHIP AND BADEN AND CONWAY BOROUGHS,
    26             RECONSTRUCTION                              2,400,000
    27             (BASE PROJECT ALLOCATION - $2,400,000)
    28     (XII)  WOODLAWN AVENUE
    29         (A)  WOODLAWN AVENUE EXTENSION, NEW
    30             ROADWAY                                       400,000
    19990H1023B3629                 - 84 -

     1             (BASE PROJECT ALLOCATION - $400,000)
     2     (XIII)  SPROAT STREET
     3         (A)  BADEN AND ECONOMY BOROUGHS, NEW
     4             CONNECTOR ROAD FROM SPROAT STREET TO
     5             QUIGLEY HIGH SCHOOL, 1 MILE LONG            1,000,000
     6             (BASE PROJECT ALLOCATION - $1,000,000)
     7     (XIV)  WOLFE LANE
     8         (A)  WOLFE LANE CONNECTOR, BRIDGEWATER
     9             BOROUGH, ENHANCEMENT                           16,000
    10             (BASE PROJECT ALLOCATION - $16,000)
    11     (XV)  PA 68
    12         (A)  VANPORT TOWNSHIP, SAFETY IMPROVEMENT         400,000
    13             (BASE PROJECT ALLOCATION - $400,000)
    14         (B)  PA 68 CORRIDOR, BEAVER BOROUGH,
    15             TRAFFIC SIGNAL IMPROVEMENT                     90,000
    16             (BASE PROJECT ALLOCATION - $90,000)
    17     (XVI)  S.R.3009
    18         (A)  KANE ROAD AT GRINGO ROAD, HOPEWELL
    19             TOWNSHIP, SAFETY IMPROVEMENT                  260,000
    20             (BASE PROJECT ALLOCATION - $260,000)
    21  (5)  BEAVER AND LAWRENCE COUNTIES
    22     (I)  RIVER ROAD
    23         (A)  WIDENING AND RECONSTRUCTION BETWEEN
    24             THE BOROUGH OF ELLWOOD CITY THROUGH
    25             WAYNE TOWNSHIP AND NORTH SEWICKLEY
    26             TOWNSHIP                                   70,000,000
    27  (6)  BEDFORD COUNTY
    28     (I)  S.R.0056
    29         (A)  IMPROVEMENTS FROM U.S.220 TO SOMERSET
    30             COUNTY LINE, EAST ST. CLAIR AND WEST
    19990H1023B3629                 - 85 -

     1             ST. CLAIR TOWNSHIPS                         2,002,000
     2             (BASE PROJECT ALLOCATION - $1,712,000)
     3             (LAND ALLOCATION - $100,000)
     4             (DESIGN AND CONTINGENCIES - $190,000)
     5         (B)  IMPROVEMENTS FROM CHESTNUT RIDGE
     6             THROUGH DUNNINGS CREEK FISH HATCHERY,
     7             LOWER PLEASANTVILLE MOUNTAIN AREAS          2,000,000
     8             (BASE PROJECT ALLOCATION - $1,600,000)
     9             (LAND ALLOCATION - $200,000)
    10             (DESIGN AND CONTINGENCIES - $200,000)
    11     (II)  S.R.0030
    12         (A)  U.S.30 FROM CLIFFS TO WOLFSBURG,
    13             PAVEMENT RESTORATION, BRIDGE
    14             REHABILITATION AND SAFETY IMPROVEMENTS        350,000
    15             (BASE PROJECT ALLOCATION - $300,000)
    16             (DESIGN AND CONTINGENCIES - $50,000)
    17         (B)  U.S.30, INTERSECTION OF I-70 AND
    18             S.R.1013 WITH U.S.30 EAST PROVIDENCE
    19             TOWNSHIP, SAFETY IMPROVEMENT                   26,000
    20             (BASE PROJECT ALLOCATION - $23,000)
    21             (LAND ALLOCATION - $1,000)
    22             (DESIGN AND CONTINGENCIES - $2,000)
    23         (C)  U.S.30, INTERSECTION OF U.S.30 AND PA
    24             56, BEDFORD TOWNSHIP, SAFETY
    25             IMPROVEMENT                                   510,000
    26             (BASE PROJECT ALLOCATION - $360,000)
    27             (LAND ALLOCATION - $60,000)
    28             (DESIGN AND CONTINGENCIES - $90,000)
    29     (III)  S.R.0070
    30         (A)  I-70 FROM PENNSYLVANIA TURNPIKE TO
    19990H1023B3629                 - 86 -

     1             FULTON COUNTY LINE, PAVEMENT
     2             RESTORATION, BRIDGE REHABILITATION AND
     3             SAFETY IMPROVEMENTS                           450,000
     4             (BASE PROJECT ALLOCATION - $400,000)
     5             (DESIGN AND CONTINGENCIES - $50,000)
     6     (IV)  S.R.0099
     7         (A)  I-99 FROM PENNSYLVANIA TURNPIKE TO
     8             BLAIR COUNTY LINE, PAVEMENT
     9             RESTORATION, BRIDGE REHABILITATION AND
    10             SAFETY IMPROVEMENTS                         1,450,000
    11             (BASE PROJECT ALLOCATION - $1,400,000)
    12             (DESIGN AND CONTINGENCIES - $50,000)
    13     (V)  S.R.0220
    14         (A)  U.S.220 FROM PENNSYLVANIA TURNPIKE
    15             SOUTH TO END OF EXPRESSWAY, PAVEMENT
    16             RESTORATION, BRIDGE REHABILITATION AND
    17             SAFETY IMPROVEMENTS                           350,000
    18             (BASE PROJECT ALLOCATION - $300,000)
    19             (DESIGN AND CONTINGENCIES - $50,000)
    20     (VI)  S.R.4009
    21         (A)  IMPROVEMENTS TO S.R.4009 IN THE
    22             BEDFORD SPRINGS AREA, BEDFORD TOWNSHIP        200,000
    23             (BASE PROJECT ALLOCATION - $180,000)
    24             (LAND ALLOCATION - $5,000)
    25             (DESIGN AND CONTINGENCIES - $15,000)
    26     (VII)  PA 915
    27         (A)  PA 26/PA 915 HOPEWELL INTERCHANGE,
    28             HOPEWELL BOROUGH, INTERSECTION
    29             IMPROVEMENT                                   265,000
    30             (BASE PROJECT ALLOCATION - $200,000)
    19990H1023B3629                 - 87 -

     1             (LAND ALLOCATION - $15,000)
     2             (DESIGN AND CONTINGENCIES - $50,000)
     3     (VIII)  PA 26
     4         (A)  EVERETT BOROUGH SIGNAL UPGRADE,
     5             EVERETT BOROUGH, SAFETY IMPROVEMENT            40,000
     6             (BASE PROJECT ALLOCATION - $40,000)
     7  (7)  BERKS COUNTY
     8     (I)  S.R.0061
     9         (A)  SAFETY IMPROVEMENTS FROM S.R.3055 TO
    10             S.R.4017, LEESPORT AREA                     2,000,000
    11             (BASE PROJECT ALLOCATION - $1,800,000)
    12             (LAND ALLOCATION - $100,000)
    13             (DESIGN AND CONTINGENCIES - $100,000)
    14         (B)  S.R.0012 TO S.R.0222, WIDEN HIGHWAY
    15             AND REPLACE EXISTING RAILROAD OVERPASS
    16             IN MUHLENBERG TOWNSHIP                     25,000,000
    17             (BASE PROJECT ALLOCATION - $21,125,000)
    18             (LAND ALLOCATION - $7,500,000)
    19             (DESIGN AND CONTINGENCIES - $3,750,000)
    20         (C)  S.R.0061 FROM HAMBURG TO SCHUYLKILL
    21             COUNTY LINE, PAVEMENT RESTORATION,
    22             BRIDGE REHABILITATION AND SAFETY
    23             IMPROVEMENTS                                  350,000
    24             (BASE PROJECT ALLOCATION - $300,000)
    25             (DESIGN AND CONTINGENCIES - $50,000)
    26     (II)  S.R.0183
    27         (A)  INTERCHANGE WITH S.R.3055,
    28             INSTALLATION OF SIGNALS                       100,000
    29             (BASE PROJECT ALLOCATION - $70,000)
    30             (LAND ALLOCATION - $10,000)
    19990H1023B3629                 - 88 -

     1             (DESIGN AND CONTINGENCIES - $20,000)
     2         (B)  INTERCHANGE WITH S.R.0012, WIDEN
     3             BRIDGE AND RECONSTRUCT INTERCHANGE IN
     4             CITY OF READING                            20,000,000
     5             (BASE PROJECT ALLOCATION - $11,000,000)
     6             (LAND ALLOCATION - $6,000,000)
     7             (DESIGN AND CONTINGENCIES - $3,000,000)
     8         (C)  INTERCHANGE WITH S.R.0222, WIDEN
     9             BRIDGE AND RECONSTRUCT INTERCHANGE IN
    10             BERN TOWNSHIP                              20,000,000
    11             (BASE PROJECT ALLOCATION - $13,000,000)
    12             (LAND ALLOCATION - $4,000,000)
    13             DESIGN AND CONTINGENCIES - $3,000,000)
    14     (III)  S.R.3021
    15         (A)  WIDEN TO 5 LANES AND SIGNAL
    16             IMPROVEMENTS BETWEEN BROADCASTING ROAD
    17             AND VAN REED ROAD, SPRING TOWNSHIP          3,100,000
    18             (BASE PROJECT ALLOCATION - $2,900,000)
    19             (DESIGN AND CONTINGENCIES - $200,000)
    20     (IV)  S.R.3040
    21         (A)  PARK ROAD INTERCHANGES WITH VAN REED
    22             ROAD AND BROADCASTING ROAD                  4,850,000
    23             (BASE PROJECT ALLOCATION - $3,500,000)
    24             (LAND ALLOCATION - $600,000)
    25             (DESIGN AND CONTINGENCIES - $750,000)
    26         (B)  CONSTRUCTION OF NEW NORTHBOUND ON-RAMP
    27             AND OFF-RAMP SYSTEM FROM S.R.3040 TO
    28             BROADCASTING ROAD, SPRING TOWNSHIP          2,900,000
    29             (BASE PROJECT ALLOCATION - $2,200,000)
    30             (LAND ALLOCATION - $250,000)
    19990H1023B3629                 - 89 -

     1             (DESIGN AND CONTINGENCIES - $450,000)
     2     (V)  S.R.0012
     3         (A)  S.R.0012 FROM S.R.0185 TO HYDE VILLA
     4             BUSINESS ROUTE 222, PAVEMENT
     5             RESTORATION, BRIDGE REHABILITATION AND
     6             SAFETY IMPROVEMENTS                           250,000
     7             (BASE PROJECT ALLOCATION - $200,000)
     8             (DESIGN AND CONTINGENCIES - $50,000)
     9     (VI)  S.R.0078
    10         (A)  I-78 FROM LEBANON COUNTY LINE TO
    11             LEHIGH COUNTY LINE PAVEMENT
    12             RESTORATION, BRIDGE REHABILITATION AND
    13             SAFETY IMPROVEMENTS                         3,550,000
    14             (BASE PROJECT ALLOCATION - $3,500,000)
    15             (DESIGN AND CONTINGENCIES - $50,000)
    16         (B)  I-78, EXIT 11 TO MILEPOST 33, WINDSOR
    17             AND GREENWICH TOWNSHIPS, PATCHING,
    18             GRINDING, RUMBLE STRIPS                       207,000
    19             (BASE PROJECT ALLOCATION - $207,000)
    20     (VII)  S.R.0100
    21         (A)  S.R.0100 FROM MONTGOMERY COUNTY LINE
    22             TO SWAMP CREEK ROAD, PAVEMENT
    23             RESTORATION, BRIDGE REHABILITATION AND
    24             SAFETY IMPROVEMENTS                           150,000
    25             (BASE PROJECT ALLOCATION - $100,000)
    26             (DESIGN AND CONTINGENCIES - $50,000)
    27     (VIII)  S.R.0176
    28         (A)  I-176 FROM PENNSYLVANIA TURNPIKE TO
    29             U.S.422, PAVEMENT RESTORATION, BRIDGE
    30             REHABILITATION AND SAFETY IMPROVEMENTS      1,150,000
    19990H1023B3629                 - 90 -

     1             (BASE PROJECT ALLOCATION - $1,100,000)
     2             (DESIGN AND CONTINGENCIES - $50,000)
     3         (B)  I-76/PA 724 INTERCHANGE IMPROVEMENT          650,000
     4     (IX)  S.R.0222
     5         (A)  U.S.222 FROM JUNCTION U.S.422 TO NORTH
     6             OF TEMPLE, PAVEMENT RESTORATION, BRIDGE
     7             REHABILITATION AND SAFETY IMPROVEMENTS        850,000
     8             (BASE PROJECT ALLOCATION - $800,000)
     9             (DESIGN AND CONTINGENCIES - $50,000)
    10         (B)  U.S.222 FROM KEMPVILLE TO S.R.8015,
    11             PAVEMENT RESTORATION, BRIDGE
    12             REHABILITATION AND SAFETY IMPROVEMENTS        450,000
    13             (BASE PROJECT ALLOCATION - $400,000)
    14             (DESIGN AND CONTINGENCIES - $50,000)
    15     (X)  S.R.0422
    16         (A)  S.R.0422 FROM S.R.8048 TO WYOMISSING,
    17             PAVEMENT RESTORATION, BRIDGE
    18             REHABILITATION AND SAFETY IMPROVEMENTS        950,000
    19             (BASE PROJECT ALLOCATION - $900,000)
    20             (DESIGN AND CONTINGENCIES - $50,000)
    21         (B)  S.R.0422 FROM MONTGOMERY COUNTY LINE
    22             TO DOUGLASSVILLE, PAVEMENT RESTORATION,
    23             BRIDGE REHABILITATION AND SAFETY
    24             IMPROVEMENTS                                  250,000
    25             (BASE PROJECT ALLOCATION - $200,000)
    26             (DESIGN AND CONTINGENCIES - $50,000)
    27  (8)  BLAIR COUNTY
    28     (I)  S.R.0036
    29         (A)  CONSTRUCTION OF TURN LANES AT
    30             INTERSECTIONS OF LOGAN BOULEVARD WITH
    19990H1023B3629                 - 91 -

     1             PLANK ROAD AND 6TH AVENUE, CITY OF
     2             ALTOONA                                       260,000
     3             (BASE PROJECT ALLOCATION - $160,000)
     4             (LAND ALLOCATION - $40,000)
     5             (DESIGN AND CONTINGENCIES - $60,000)
     6     (II)  S.R.0866
     7         (A)  WIDENING AND IMPROVEMENTS BETWEEN
     8             U.S.22 AND MARTINSBURG                      2,960,000
     9             (BASE PROJECT ALLOCATION - $2,400,000)
    10             (LAND ALLOCATION - $500,000)
    11             (DESIGN AND CONTINGENCIES - $60,000)
    12         (B)  PA 866 FROM CURRYVILLE TO ROYER,
    13             HUSTON AND NORTH WOODBURY TOWNSHIPS,
    14             RESTORATION                                   550,000
    15             (BASE PROJECT ALLOCATION - $200,000)
    16             (LAND ALLOCATION - $50,000)
    17             (DESIGN AND CONTINGENCIES - $300,000)
    18     (III)  S.R.4004
    19         (A)  WIDEN, RECONSTRUCTION AND INTERSECTION
    20             IMPROVEMENTS FROM PLANK ROAD TO RUSKIN
    21             STREET                                        612,000
    22             (BASE PROJECT ALLOCATION - $334,000)
    23             (LAND ALLOCATION - $233,000)
    24             (DESIGN AND CONTINGENCIES - $45,000)
    25         (B)  LOGAN VALLEY MALL TO 58TH STREET,
    26             ALLEGHENY TOWNSHIP AND CITY OF ALTOONA,
    27             RECONSTRUCTION                                570,000
    28             (BASE PROJECT ALLOCATION - $400,000)
    29             (LAND ALLOCATION - $80,000)
    30             (DESIGN AND CONTINGENCIES - $90,000)
    19990H1023B3629                 - 92 -

     1     (IV)  S.R.4004 AND S.R.4006
     2         (A)  WIDEN, RECONSTRUCTION AND INTERSECTION
     3             IMPROVEMENTS GOODS LANE TO PA 764             601,000
     4             (BASE PROJECT ALLOCATION - $353,000)
     5             (LAND ALLOCATION - $200,000)
     6             (DESIGN AND CONTINGENCIES - $48,000)
     7     (V)  S.R.4013
     8         (A)  NORTH ALTOONA ACCESS, SECOND STREET TO
     9             PINECROFT, LOGAN TOWNSHIP AND ANTIS
    10             TOWNSHIP                                   25,300,000
    11             (BASE PROJECT ALLOCATION - $20,000,000)
    12             (LAND ALLOCATION - $2,000,000)
    13             (DESIGN AND CONTINGENCIES - $3,300,000)
    14     (VI)  S.R.4029
    15         (A)  IMPROVEMENTS FROM S.R.4027 TO ALONG
    16             S.R.4029, TYRONE BOROUGH                      650,000
    17             (BASE PROJECT ALLOCATION - $500,000)
    18             (LAND ALLOCATION - $50,000)
    19             (DESIGN AND CONTINGENCIES - $100,000
    20     (VII)  NINTH AVENUE
    21         (A)  EXTENSION OF NINTH AVENUE AS FOUR-LANE
    22             ROADWAY BETWEEN SEVENTH STREET AND
    23             TWELFTH STREET                             12,000,000
    24             (BASE PROJECT ALLOCATION - $6,000,000)
    25             (LAND ALLOCATION - $6,000,000)
    26     (VIII)  S.R.0099
    27         (A)  I-99 FROM BEDFORD COUNTY LINE TO
    28             U.S.220, PAVEMENT RESTORATION, BRIDGE
    29             REHABILITATION AND SAFETY IMPROVEMENTS      3,750,000
    30             (BASE PROJECT ALLOCATION - $3,700,000)
    19990H1023B3629                 - 93 -

     1             (DESIGN AND CONTINGENCIES - $50,000)
     2     (IX)  S.R.0022
     3         (A)  U.S.22 FROM I-99 JUNCTION TO CAMBRIA
     4             COUNTY LINE, PAVEMENT RESTORATION,
     5             BRIDGE REHABILITATION AND SAFETY
     6             IMPROVEMENTS                                  850,000
     7             (BASE PROJECT ALLOCATION - $800,000)
     8             (DESIGN AND CONTINGENCIES - $50,000)
     9     (X)  S.R.9900
    10         (A)  CONSTRUCTION OF PARK AVENUE EXTENSION
    11             FROM 17TH STREET TO FRANKSTOWN ROAD           900,000
    12             (BASE PROJECT ALLOCATION - $700,000)
    13             (LAND ALLOCATION - $100,000)
    14             (DESIGN AND CONTINGENCIES - $100,000)
    15         (B)  S.R.9900, PARK AVENUE/SIXTH STREET
    16             EXTENSION, NEW ROADWAY                        800,000
    17             (BASE PROJECT ALLOCATION - $600,000)
    18             (LAND ALLOCATION - $100,000)
    19             (DESIGN AND CONTINGENCIES - $100,000)
    20     (XI)  S.R.4010
    21         (A)  17TH STREET EXIT OF I-99 TO PA 36,
    22             LOGAN TOWNSHIP, NEW ROADWAY                   760,000
    23             (BASE PROJECT ALLOCATION - $500,000)
    24             (LAND ALLOCATION - $100,000)
    25             (DESIGN AND CONTINGENCIES - $160,000)
    26  (9)  BRADFORD COUNTY
    27     (I)  S.R.0220
    28         (A)  U.S.220 FROM DUNN ROAD TO HEMLOCK RUN
    29             ROAD, PAVEMENT RESTORATION, BRIDGE
    30             REHABILITATION AND SAFETY IMPROVEMENTS        550,000
    19990H1023B3629                 - 94 -

     1             (BASE PROJECT ALLOCATION - $500,000)
     2             (DESIGN AND CONTINGENCIES - $50,000)
     3         (B)  U.S.220 FROM HILL ROAD TO NEW YORK
     4             STATE LINE, PAVEMENT RESTORATION,
     5             BRIDGE REHABILITATION AND SAFETY
     6             IMPROVEMENTS                                  550,000
     7             (BASE PROJECT ALLOCATION - $500,000)
     8             (DESIGN AND CONTINGENCIES - $50,000)
     9         (C)  ALBANY TOWNSHIP, SULLIVAN/BRADFORD
    10             COUNTY LINE TO VILLAGE OF SOUTH BRANCH      6,300,000
    11             (BASE PROJECT ALLOCATION - $5,000,000)
    12             (LAND ALLOCATION - $300,000)
    13             (DESIGN AND CONTINGENCIES - $1,000,000)
    14     (II)  S.R.0706
    15         (A)  WYALUSING BOROUGH AND WYALUSING
    16             TOWNSHIP, JUNCTION U.S.6 TO S.R.1004       15,000,000
    17             (BASE PROJECT ALLOCATION - $12,000,000)
    18             (LAND ALLOCATION - $1,000,000)
    19             (DESIGN AND CONTINGENCIES - $2,000,000)
    20         (B)  WYALUSING BOROUGH TO SUSQUEHANNA
    21             COUNTY LINE, WYALUSING AND STEVENS
    22             TOWNSHIPS, RESTORATION AND WIDENING         1,500,000
    23             (BASE PROJECT ALLOCATION - $1,300,000)
    24             (LAND ALLOCATION - $20,000)
    25             (DESIGN AND CONTINGENCIES - $180,000)
    26     (III)  S.R.0014
    27         (A)  BOROUGH OF TROY, FALLBROOK ROAD,
    28             S.R.3032 TO MAIN STREET S.R.0006              390,000
    29             (BASE PROJECT ALLOCATION - $240,000)
    30             (LAND ALLOCATION - $30,000)
    19990H1023B3629                 - 95 -

     1             (DESIGN AND CONTINGENCIES - $120,000)
     2     (IV)  S.R.0006
     3         (A)  STANDING STONE TOWNSHIP, T-610 RIVER
     4             ROAD TO T-580 TRACY ROAD                    7,150,000
     5             (BASE PROJECT ALLOCATION - $6,000,000)
     6             (LAND ALLOCATION - $150,000)
     7             (DESIGN AND CONTINGENCIES - $1,000,000)
     8         (B)  U.S.6 FROM WYSOX NARROWS TO
     9             RUMMERFIELD, RECONSTRUCTION AND
    10             WIDENING                                      381,000
    11             (BASE PROJECT ALLOCATION - $194,000)
    12             (LAND ALLOCATION - $30,000)
    13             (DESIGN AND CONTINGENCIES - $157,000)
    14         (C)  U.S. 6 FROM THE TIOGA/BEDFORD COUNTY
    15             LINE EAST TO SYLVANIA, RECONSTRUCTION
    16             AND WIDENING                                  591,000
    17             (BASE PROJECT ALLOCATION - $411,000)
    18             (LAND ALLOCATION - $20,000)
    19             (DESIGN AND CONTINGENCIES - $160,000)
    20  (10)  BUCKS COUNTY
    21     (I)  S.R.0001
    22         (A)  U.S.1 FROM NEW JERSEY STATE LINE TO
    23             PHILADELPHIA COUNTY LINE, PAVEMENT
    24             RESTORATION, BRIDGE REHABILITATION AND
    25             SAFETY IMPROVEMENTS                         1,450,000
    26             (BASE PROJECT ALLOCATION - $1,400,000)
    27             (DESIGN AND CONTINGENCIES - $50,000)
    28     (II)  S.R.0013
    29         (A)  U.S.13 FROM TULLYTOWN TO JUNCTION
    30             U.S.1, PAVEMENT RESTORATION, BRIDGE
    19990H1023B3629                 - 96 -

     1             REHABILITATION AND SAFETY IMPROVEMENTS        450,000
     2             (BASE PROJECT ALLOCATION - $400,000)
     3             (DESIGN AND CONTINGENCIES - $50,000)
     4     (III)  S.R.0095
     5         (A)  I-95 FROM PHILADELPHIA COUNTY LINE TO
     6             NEW JERSEY, PAVEMENT RESTORATION,
     7             BRIDGE REHABILITATION AND SAFETY
     8             IMPROVEMENTS                                1,850,000
     9             (BASE PROJECT ALLOCATION - $1,800,000)
    10             (DESIGN AND CONTINGENCIES - $50,000)
    11     (IV)  S.R.0202
    12         (A)  U.S.202 FROM S.R.3002 TO PA 611,
    13             DOYLESTOWN, PAVEMENT RESTORATION,
    14             BRIDGE REHABILITATION AND SAFETY
    15             IMPROVEMENTS                                  250,000
    16             (BASE PROJECT ALLOCATION - $200,000)
    17             (DESIGN AND CONTINGENCIES - $50,000)
    18     (V)  S.R.0309
    19         (A)  S.R.0309 FROM MONTGOMERY COUNTY LINE
    20             TO RICH HILL, PAVEMENT RESTORATION,
    21             BRIDGE REHABILITATION AND SAFETY
    22             IMPROVEMENTS                                  850,000
    23             (BASE PROJECT ALLOCATION - $800,000)
    24             (DESIGN AND CONTINGENCIES - $50,000)
    25     (VI)  S.R.0611
    26         (A)  S.R.0611 FROM BRIDGEPOINT TO
    27             DYERSTOWN, PAVEMENT RESTORATION, BRIDGE
    28             REHABILITATION AND SAFETY IMPROVEMENTS        550,000
    29             (BASE PROJECT ALLOCATION - $500,000)
    30             (DESIGN AND CONTINGENCIES - $50,000)
    19990H1023B3629                 - 97 -

     1     (VII)  S.R.2038
     2         (A)  COUNTY LINE ROAD EXTENSION FROM
     3             BUSTLETON TO PHILMONT AVENUE, LOWER
     4             SOUTHAMPTON TOWNSHIP                        2,080,000
     5             (BASE PROJECT ALLOCATION - $2,000,000)
     6             (LAND ALLOCATION - $20,000)
     7             (DESIGN AND CONTINGENCIES - $60,000)
     8     (VIII)  PA 132
     9         (A)  STREET ROAD (PA 132) AND I-95
    10             INTERCHANGE, BENSALEM TOWNSHIP,
    11             INTERCHANGE IMPROVEMENTS                    4,800,000
    12             (BASE PROJECT ALLOCATION - $4,000,000)
    13             (LAND ALLOCATION - $400,000)
    14             (DESIGN AND CONTINGENCIES - $400,000)
    15     (IX)  S.R.2006
    16         (A)  INTERSECTION OF NEW FALLS ROAD
    17             (S.R.2006) AND WISTAR ROAD,
    18             INTERSECTION IMPROVEMENTS                     120,000
    19             (BASE PROJECT ALLOCATION - $100,000)
    20             (DESIGN AND CONTINGENCIES - $20,000)
    21     (X)  S.R. 2022
    22         (A)  S.R.2022 FROM PA 413 TO STREET ROAD
    23             (PA 132) INTERSECTION, INTERSECTION
    24             IMPROVEMENTS                                  120,000
    25             (BASE PROJECT ALLOCATION - $100,000)
    26             (DESIGN AND CONTINGENCIES - $20,000)
    27     (XI)  S.R.2025
    28         (A)  S.R.2025 FROM HULMEVILLE ROAD TO OLD
    29             LINCOLN HIGHWAY, BENSALEM TOWNSHIP,
    30             INTERSECTION IMPROVEMENTS                   1,251,000
    19990H1023B3629                 - 98 -

     1             (BASE PROJECT ALLOCATION - $450,000)
     2             (LAND ALLOCATION - $250,000)
     3             (DESIGN AND CONTINGENCIES - $551,000)
     4     (XII)  S.R.2029
     5         (A)  S.R.2029, INTERSECTION OF OXFORD
     6             VALLEY ROAD AND LEVITTOWN PARKWAY,
     7             FALLS AND MIDDLETOWN TOWNSHIPS,
     8             INTERSECTION IMPROVEMENTS                   1,060,000
     9             (BASE PROJECT ALLOCATION - $760,000)
    10             (LAND ALLOCATION - $300,000)
    11         (B)  S.R.2029, OXFORD VALLEY ROAD AT U.S.1
    12             INTERCHANGE, LOWER MAKEFIELD TOWNSHIP,
    13             INTERCHANGE IMPROVEMENTS                      375,000
    14             (BASE PROJECT ALLOCATION - $375,000)
    15     (XIII)  S.R.2069
    16         (A)  S.R.2069 FROM HEACOCK TO OXFORD VALLEY
    17             ROAD, LOWER MAKEFIELD TOWNSHIP,
    18             REALIGNMENT                                   500,000
    19             (BASE PROJECT ALLOCATION - $500,000)
    20     (XIV)  S.R.2002
    21         (A)  STORM WATER DRAINAGE
    22             PROJECT/RECONSTRUCTION ON STATE ROAD
    23             FROM ELM AVENUE TO THE NESHAMINY CREEK,
    24             CROYDON, BRISTOL TOWNSHIP                   2,000,000
    25             (BASE PROJECT ALLOCATION - $1,750,000)
    26             (DESIGN AND CONTINGENCIES - $250,000)
    27  (11)  BUTLER COUNTY
    28     (I)  S.R.0079
    29         (A)  I-79 FROM ALLEGHENY COUNTY LINE TO
    30             LAWRENCE COUNTY LINE, PAVEMENT
    19990H1023B3629                 - 99 -

     1             RESTORATION, BRIDGE REHABILITATION AND
     2             SAFETY IMPROVEMENTS                         2,750,000
     3             (BASE PROJECT ALLOCATION - $2,700,000)
     4             (DESIGN AND CONTINGENCIES - $50,000)
     5         (B)  I-79, FROM ALLEGHENY COUNTY LINE TO
     6             LAWRENCE COUNTY LINE, COUNTYWIDE
     7             ROADWAY AND SAFETY IMPROVEMENTS             4,040,000
     8             (BASE PROJECT ALLOCATION - $4,000,000)
     9             (DESIGN AND CONTINGENCIES - $40,000)
    10     (II)  S.R.0080
    11         (A)  I-80 FROM CLARION COUNTY LINE TO
    12             VENANGO COUNTY LINE, PAVEMENT
    13             RESTORATION, BRIDGE REHABILITATION AND
    14             SAFETY IMPROVEMENTS                           250,000
    15             (BASE PROJECT ALLOCATION - $200,000)
    16             (DESIGN AND CONTINGENCIES - $50,000)
    17     (III)  S.R.0422
    18         (A)  U.S.422 FROM OLD 422 EAST TO I-79
    19             INTERCHANGE, PAVEMENT RESTORATION,
    20             BRIDGE REHABILITATION AND SAFETY
    21             IMPROVEMENTS                                1,350,000
    22             (BASE PROJECT ALLOCATION - $1,300,000)
    23             (DESIGN AND CONTINGENCIES - $50,000)
    24     (IV)  S.R.0019 AND S.R.0528
    25         (A)  WIDEN S.R.0019 AND S.R.0528 AND
    26             INSTALL NEW SIGNALIZATION AT
    27             INTERSECTION OF S.R.0019 AND S.R.0528,
    28             JACKSON TOWNSHIP                            1,783,000
    29             (BASE PROJECT ALLOCATION - $1,550,000)
    30             (DESIGN AND CONTINGENCIES - $233,000)
    19990H1023B3629                 - 100 -

     1     (V)  PA 228
     2         (A)  INTERSECTION OF PA 228/S.R.2007/T-840,
     3             CLINTON TOWNSHIP, INTERSECTION
     4             IMPROVEMENTS                                  340,000
     5             (BASE CONSTRUCTION ALLOCATION -
     6             $140,000)
     7             (LAND ALLOCATION - $50,000)
     8             (DESIGN AND CONTINGENCIES - $150,000)
     9         (B)  PA 228, INTERSECTIONS AT S.R.2007 AND
    10             T-840, CLINTON TOWNSHIP, SAFETY
    11             IMPROVEMENT                                   187,000
    12             (BASE PROJECT ALLOCATION - $140,000)
    13             (LAND ALLOCATION - $10,000)
    14             (DESIGN AND CONTINGENCIES - $37,000)
    15     (VI)  WETLAND BANKING
    16         (A)  COUNTYWIDE RECONSTRUCTION OF WETLAND
    17             BANKING                                        80,000
    18             (BASE PROJECT ALLOCATION - $40,000)
    19             (LAND ALLOCATION - $20,000)
    20             (DESIGN AND CONTINGENCIES - $20,000)
    21     (VII)  U.S.19
    22         (A)  ZELIENOPLE BOROUGH AND JACKSON
    23             TOWNSHIP, TRAFFIC STUDY                       695,000
    24             (BASE PROJECT ALLOCATION - $600,000)
    25             (LAND ALLOCATION - $20,000)
    26             (DESIGN AND CONTINGENCIES - $75,000)
    27     (VIII)  PA 68
    28         (A)  EVANS CITY BOROUGH, TRAFFIC SIGNAL
    29             IMPROVEMENT                                    82,000
    30             (BASE PROJECT ALLOCATION - $60,000)
    19990H1023B3629                 - 101 -

     1             (LAND ALLOCATION - $1,000)
     2             (DESIGN AND CONTINGENCIES - $21,000)
     3     (IX)  PA 356
     4         (A)  PA 356, BUFFALO TOWNSHIP, INTERSECTION
     5             OF PA 356 AND S.R.2018 (SARVER ROAD),
     6             RECONSTRUCTION                                151,000
     7             (BASE PROJECT ALLOCATION - $90,000)
     8             (LAND ALLOCATION - $25,000)
     9             (DESIGN AND CONTINGENCIES - $36,000)
    10     (X)  PA 288
    11         (A)  ZELIENOPLE BOROUGH, INTERSECTION OF PA
    12             288 AND PA 588, SAFETY IMPROVEMENTS           151,000
    13             (BASE PROJECT ALLOCATION - $100,000)
    14             (LAND ALLOCATION - $15,000)
    15             (DESIGN AND CONTINGENCIES - $36,000)
    16     (XI)  S.R.8002
    17         (A)  MUDDY CREEK TOWNSHIP, INTERSECTION OF
    18             S.R.8002 AND U.S.422, NEW INTERCHANGE         304,000
    19             (BASE PROJECT ALLOCATION - $240,000)
    20             (LAND ALLOCATION - $4,000)
    21             (DESIGN AND CONTINGENCIES - $60,000)
    22  (12)  CAMBRIA COUNTY
    23     (I)  S.R.0022
    24         (A)  CONCRETE REHABILITATION FROM EBENSBURG
    25             TO BLAIR COUNTY LINE, CRESSON, MUNSTER
    26             AND CAMBRIA TOWNSHIPS                       1,150,000
    27             (BASE PROJECT ALLOCATION - $1,100,000)
    28             (DESIGN AND CONTINGENCIES - $50,000)
    29         (B)  U.S.22 FROM PA 271 MUNDYS CORNER TO 1
    30             MILE WEST, PAVEMENT RESTORATION, BRIDGE
    19990H1023B3629                 - 102 -

     1             REHABILITATION AND SAFETY IMPROVEMENTS        150,000
     2             (BASE PROJECT ALLOCATION - $100,000)
     3             (DESIGN AND CONTINGENCIES - $50,000)
     4         (C)  U.S.22 EBENSBURG AREA, CAMBRIA
     5             TOWNSHIP, SAFETY IMPROVEMENTS               2,150,000
     6             (BASE PROJECT ALLOCATION - $1,600,000)
     7             (LAND ALLOCATION - $400,000)
     8             (DESIGN AND CONTINGENCIES - $150,000)
     9         (D)  U.S.22 FROM INTERSECTION WITH U.S.219
    10             TO BLAIR COUNTY LINE, RESTORATION           2,220,000
    11             (BASE PROJECT ALLOCATION - $2,000,000)
    12             (LAND ALLOCATION - $20,000)
    13             (DESIGN AND CONTINGENCIES - $200,000)
    14     (II)  S.R.0056
    15         (A)  S.R.0056 FROM U.S.219 TO JOHNSTOWN,
    16             PAVEMENT RESTORATION, BRIDGE
    17             REHABILITATION AND SAFETY IMPROVEMENTS        750,000
    18             (BASE PROJECT ALLOCATION - $700,000)
    19             (DESIGN AND CONTINGENCIES - $50,000)
    20         (B)  PA 56 FROM BROAD AVENUE TO U.S.22,
    21             CITY OF JOHNSTOWN, RELOCATION               1,000,000
    22             (DESIGN AND CONTINGENCIES - $1,000,000)
    23         (C)  PA 56, WIDMAN ROCKFALL FENCE,
    24             STONYCREEK TOWNSHIP, SAFETY
    25             IMPROVEMENT                                   205,000
    26             (BASE PROJECT ALLOCATION - $180,000)
    27             (LAND ALLOCATION - $5,000)
    28             (DESIGN AND CONTINGENCIES - $20,000)
    29         (D)  PA 56, U.S.219 TO WIDMAN STREET,
    30             RICHLAND TOWNSHIP, RESTORATION                460,000
    19990H1023B3629                 - 103 -

     1             (BASE PROJECT ALLOCATION - $400,000)
     2             (LAND ALLOCATION - $20,000)
     3             (DESIGN AND CONTINGENCIES - $40,000)
     4     (III)  S.R.0219
     5         (A)  U.S.219 FROM SOMERSET COUNTY LINE TO
     6             S.R.4031 INTERCHANGE, PAVEMENT
     7             RESTORATION, BRIDGE REHABILITATION AND
     8             SAFETY IMPROVEMENTS                         2,650,000
     9             (BASE PROJECT ALLOCATION - $2,600,000)
    10             (DESIGN AND CONTINGENCIES - $50,000)
    11         (B)  U.S.219, FROM U.S.22 TO U.S.422,
    12             CAMBRIA TOWNSHIP, RESTORATION                 560,000
    13             (BASE PROJECT ALLOCATION - $560,000)
    14     (IV)  S.R.0271
    15         (A)  PERGRIM HILL TWIN LANE WITH SHOEMAKER
    16             STREET, JACKSON TOWNSHIP                      680,000
    17             (BASE PROJECT ALLOCATION - $480,000)
    18             (LAND ALLOCATION - $140,000)
    19             (DESIGN AND CONTINGENCIES - $60,000)
    20         (B)  PA 271, SHOEMAKER STREET, JACKSON
    21             TOWNSHIP, WIDENING AND ADD TURN LANE        3,599,000
    22             (BASE PROJECT ALLOCATION - $2,400,000)
    23             (LAND ALLOCATION - $799,000)
    24             (DESIGN AND CONTINGENCIES - $400,000)
    25         (C)  PA 271, MAPLE AND CLINTON STREETS,
    26             CITY OF JOHNSTOWN, SAFETY IMPROVEMENT         363,000
    27             (BASE PROJECT ALLOCATION - $300,000)
    28             (LAND ALLOCATION - $23,000)
    29             (DESIGN AND CONTINGENCIES - $40,000)
    30     (V)  S.R.4021
    19990H1023B3629                 - 104 -

     1         (A)  S.R.4021 FROM U.S.219 TO HASTINGS
     2             ACCESS ROAD, SUSQUEHANNA TOWNSHIP,
     3             RECONSTRUCTION AND REALIGNMENT                827,000
     4             (BASE PROJECT ALLOCATION - $672,000)
     5             (LAND ALLOCATION - $90,000)
     6             (DESIGN AND CONTINGENCIES - $65,000)
     7     (VI)  PA 756
     8         (A)  U.S.219 TO SCALP AVENUE, GEISTOWN AND
     9             RICHLAND TOWNSHIP, RESTORATION                710,000
    10             (BASE PROJECT ALLOCATION - $400,000)
    11             (LAND ALLOCATION - $190,000)
    12             (DESIGN AND CONTINGENCIES - $120,000)
    13     (VII)  PA 53
    14         (A)  INTERSECTION WITH PA 36, ASHVILLE
    15             BOROUGH, INTERSECTION IMPROVEMENT             280,000
    16             (BASE PROJECT ALLOCATION - $200,000)
    17             (LAND ALLOCATION - $40,000)
    18             (DESIGN AND CONTINGENCIES - $40,000)
    19     (VIII)  U.S.422
    20         (A)  CAMBRIA AND BLACKLICK TOWNSHIPS,
    21             RECONSTRUCTION                                920,000
    22             (BASE PROJECT ALLOCATION - $700,000)
    23             (LAND ALLOCATION - $20,000)
    24             (DESIGN AND CONTINGENCIES - $200,000)
    25  (13)  CARBON COUNTY
    26     (I)  S.R.0080
    27         (A)  I-80 FROM MONROE COUNTY LINE TO
    28             LUZERNE COUNTY LINE, PAVEMENT
    29             RESTORATION, BRIDGE REHABILITATION AND
    30             SAFETY IMPROVEMENTS                         1,050,000
    19990H1023B3629                 - 105 -

     1             (BASE PROJECT ALLOCATION - $1,000,000)
     2             (DESIGN AND CONTINGENCIES - $50,000)
     3     (II)  S.R.0248
     4         (A)  S.R.0248 FROM NORTHAMPTON COUNTY LINE
     5             TO LEHIGHTON, PAVEMENT RESTORATION,
     6             BRIDGE REHABILITATION AND SAFETY
     7             IMPROVEMENTS                                  750,000
     8             (BASE PROJECT ALLOCATION - $700,000)
     9             (DESIGN AND CONTINGENCIES - $50,000)
    10     (III)  S.R.0054
    11         (A)  S CURVES, SAFETY IMPROVEMENTS              5,000,000
    12             (BASE PROJECT ALLOCATION - $4,500,000)
    13             (LAND ALLOCATION - $250,000)
    14             (DESIGN AND CONTINGENCIES - $250,000)
    15  (14)  CENTRE COUNTY
    16     (I)  S.R.0080
    17         (A)  I-80 FROM CLINTON COUNTY LINE TO
    18             CLEARFIELD COUNTY LINE, PAVEMENT
    19             RESTORATION, BRIDGE REHABILITATION AND
    20             SAFETY IMPROVEMENTS                         3,350,000
    21             (BASE PROJECT ALLOCATION - $3,300,000)
    22             (DESIGN AND CONTINGENCIES - $50,000)
    23     (II)  S.R.0322
    24         (A)  BOALSBURG TO BEAR MEADOWS ROAD, HARRIS
    25             TOWNSHIP                                      150,000
    26             (BASE PROJECT ALLOCATION - $90,000)
    27             (LAND ALLOCATION - $10,000)
    28             (DESIGN AND CONTINGENCIES - $50,000)
    29         (B)  IMPROVEMENTS TO S.R.0322 AT WADDLE
    30             ROAD, WIDENING OF WADDLE ROAD FROM
    19990H1023B3629                 - 106 -

     1             S.R.0322 TO CLEARVIEW ROAD, PATTON
     2             TOWNSHIP                                    5,000,000
     3             (BASE PROJECT ALLOCATION - $4,000,000)
     4             (LAND ALLOCATION - $300,000)
     5             (DESIGN AND CONTINGENCIES - $700,000)
     6         (C)  WIDEN TO 5 LANES BETWEEN PARK FOREST
     7             DRIVE AND DOUGLAS DRIVE, PATTON
     8             TOWNSHIP                                    3,000,000
     9             (BASE PROJECT ALLOCATION - $2,500,000)
    10             (LAND ALLOCATION - $200,000)
    11             (DESIGN AND CONTINGENCIES - $300,000)
    12         (D)  U.S.322 FROM BOALSBURG TO SCOTIA ROAD,
    13             PAVEMENT RESTORATION, BRIDGE
    14             REHABILITATION AND SAFETY IMPROVEMENTS      1,050,000
    15             (BASE PROJECT ALLOCATION - $1,000,000)
    16             (DESIGN AND CONTINGENCIES - $50,000)
    17         (E)  U.S.322 FROM JACK'S MILL DRIVE TO BEAR
    18             ROAD, HARRIS TOWNSHIP, LEFT TURN LANES        290,000
    19             (BASE PROJECT ALLOCATION - $200,000)
    20             (LAND ALLOCATION - $20,000)
    21             (DESIGN AND CONTINGENCIES - $70,000)
    22     (III)  S.R.0026
    23         (A)  WIDEN WEST COLLEGE AVENUE, S.R.0026        7,260,000
    24             (BASE PROJECT ALLOCATION - $6,180,000)
    25             (LAND ALLOCATION - $180,000)
    26             (DESIGN AND CONTINGENCIES - $900,000)
    27     (IV)  T-355
    28         (A)  EXTENSION OF OLD GATESBURG ROAD            1,770,000
    29             (BASE PROJECT ALLOCATION - $1,290,000)
    30             (LAND ALLOCATION - $350,000)
    19990H1023B3629                 - 107 -

     1             (DESIGN AND CONTINGENCIES - $130,000)
     2     (V)  INTERSECTION OF S.R.0550 AND S.R.3008
     3         (A)  IMPROVEMENT TO THE INTERSECTION OF
     4             ROUTES 550 AND 3008 TO ENHANCE SIGHT
     5             DISTANCE AND REMOVE ACCIDENT PROBLEM
     6             AREA, SAFETY AND MOBILITY INITIATIVE
     7             (SAMI), BENNER TOWNSHIP                       213,000
     8             (BASE PROJECT ALLOCATION -$103,000)
     9             (LAND ALLOCATION - $10,000)
    10             (DESIGN AND CONTINGENCIES - $100,000
    11     (VI)  S.R.0099
    12         (A)  UTILITY RELOCATION FROM S.C.I.
    13             ROCKVIEW, BENNER TOWNSHIP                     550,000
    14             (BASE PROJECT ALLOCATION - $500,000)
    15             (LAND ALLOCATION - $50,000)
    16     (VII)  WADDLE ROAD
    17         (A)  FROM ATHERTON STREET THROUGH U.S.322
    18             INTERCHANGE, PATTON TOWNSHIP,
    19             RECONSTRUCTION, WIDENING AND SAFETY
    20             IMPROVEMENTS                                  500,000
    21             (BASE PROJECT ALLOCATION - $400,000)
    22             (LAND ALLOCATION - $50,000)
    23             (DESIGN AND CONTINGENCIES - $50,000)
    24  (15)  CHESTER COUNTY
    25     (I)  S.R.0001
    26         (A)  U.S.1 FROM MARYLAND STATE LINE TO
    27             KENNETT SQUARE, PAVEMENT RESTORATION,
    28             BRIDGE REHABILITATION AND SAFETY
    29             IMPROVEMENTS                                2,150,000
    30             (BASE PROJECT ALLOCATION - $2,100,000)
    19990H1023B3629                 - 108 -

     1             (DESIGN AND CONTINGENCIES - $50,000)
     2     (II)  S.R.0030
     3         (A)  U.S.30 FROM JUNCTION U.S.202 TO
     4             JUNCTION BUSINESS U.S.30, PAVEMENT
     5             RESTORATION, BRIDGE REHABILITATION AND
     6             SAFETY IMPROVEMENTS                         1,850,000
     7             (BASE PROJECT ALLOCATION - $1,800,000)
     8             (DESIGN AND CONTINGENCIES - $50,000)
     9     (III)  S.R.0202
    10         (A)  U.S.202 FROM MONTGOMERY COUNTY LINE TO
    11             WEST CHESTER, PAVEMENT RESTORATION,
    12             BRIDGE REHABILITATION AND SAFETY
    13             IMPROVEMENTS                                1,750,000
    14             (BASE PROJECT ALLOCATION - $1,700,000)
    15             (DESIGN AND CONTINGENCIES - $50,000)
    16     (IV)  S.R.0422
    17         (A)  U.S.422 FROM U.S.202 TO MONTGOMERY
    18             COUNTY LINE, PAVEMENT RESTORATION,
    19             BRIDGE REHABILITATION AND SAFETY
    20             IMPROVEMENTS                                  450,000
    21             (BASE PROJECT ALLOCATION - $400,000)
    22             (DESIGN AND CONTINGENCIES - $50,000)
    23         (B)  U.S.422, BERKS COUNTY LINE TO
    24             SCHUYLKILL RIVER, RECONSTRUCTION            3,160,000
    25             (BASE PROJECT ALLOCATION - $3,000,000)
    26             (LAND ALLOCATION - $60,000)
    27             (DESIGN AND CONTINGENCIES - $100,000)
    28     (V)  S.R.0100/S.R.2023
    29         (A)  S.R.0100/S.R.2023 FROM S.R.2022 TO
    30             U.S.202, PAVEMENT RESTORATION, BRIDGE
    19990H1023B3629                 - 109 -

     1             REHABILITATION AND SAFETY IMPROVEMENTS        250,000
     2             (BASE PROJECT ALLOCATION - $200,000)
     3             (DESIGN AND CONTINGENCIES - $50,000)
     4         (B)  PA 100/PA 113, INTERCHANGE AND ACCESS
     5             IMPROVEMENTS                                5,000,000
     6             (BASE PROJECT ALLOCATION - $4,000,000)
     7             (LAND ALLOCATION - $500,000)
     8             (DESIGN AND CONTINGENCIES - $500,000)
     9     (VI)  S.R.9900
    10         (A)  RECONSTRUCTION OF KINGS ROW ROAD IN
    11             NEW LONDON TOWNSHIP                           100,000
    12             (BASE PROJECT ALLOCATION - $100,000)
    13     (VII)  S.R.0252
    14         (A)  S.R.0252 AT THE INTERSECTION OF ROUTE
    15             30, WIDEN RAIL UNDERPASS                   17,000,000
    16     (VIII)  S.R.0029
    17         (A)  INTERSECTION IMPROVEMENTS ON S.R.0029
    18             IN PHOENIXVILLE, CHARLESTOWN TOWNSHIP       1,750,000
    19     (IX)  S.R.0023 AND S.R.0029
    20         (A)  DESIGN AND CONSTRUCTION OF FRENCH
    21             CREEK DRIVE CONNECTOR BETWEEN S.R.0023
    22             AND S.R.0029, BOROUGH OF PHOENIXVILLE       7,360,000
    23             (BASE PROJECT ALLOCATION - $6,400,000)
    24             (DESIGN AND CONTINGENCIES - $960,000)
    25     (X)  S.R.0113
    26         (A)  RELOCATION OF S.R.0113 IN THE BOROUGH
    27             OF PHOENIXVILLE                             5,864,000
    28             (BASE PROJECT ALLOCATION - $4,026,000)
    29             (LAND ALLOCATION - $1,234,000)
    30             (DESIGN AND CONTINGENCIES - $604,000)
    19990H1023B3629                 - 110 -

     1     (XI)  PA 252
     2         (A)  RECONSTRUCTION UNDER SEPTA RAIL
     3             TRACKS                                     17,000,000
     4             (BASE PROJECT ALLOCATION - $14,450,000)
     5             (DESIGN AND CONTINGENCIES - $2,550,000)
     6     (XII)  WAGONTOWN ROAD
     7         (A)  WAGONTOWN ROAD FLOOD REPAIR,
     8             RECONSTRUCTION AND RETAINING WALL             800,000
     9             (BASE PROJECT ALLOCATION - $500,000)
    10             (LAND ALLOCATION - $100,000)
    11             (DESIGN AND CONTINGENCIES - $200,000)
    12     (XIII)  PA 926
    13         (A)  PA 26 AND NEW STREET INTERSECTION,
    14             WESTTOWN TOWNSHIP, INTERSECTION
    15             IMPROVEMENTS                                   83,000
    16             (BASE PROJECT ALLOCATION - $72,000)
    17             (DESIGN AND CONTINGENCIES - $11,000)
    18     (XIV)  FRENCH CREEK PARKWAY
    19         (A)  FRENCH CREEK PARKWAY, NEW ROADWAY          3,260,000
    20             (BASE PROJECT ALLOCATION - $2,420,000)
    21             (LAND ALLOCATION - $440,000)
    22             (DESIGN AND CONTINGENCIES - $400,000)
    23     (XV)  S.R. 0100
    24         (A)  ROADWAY, SAFETY AND ACCESS
    25             IMPROVEMENTS, UWCHLAN TOWNSHIP, IN THE
    26             VICINITY OF PA 100 AND PA 113               3,000,000
    27             (BASE PROJECT ALLOCATION - $2,600,000)
    28             (LAND ALLOCATION - $200,000)
    29             (DESIGN AND CONTINGENCIES - $200,000)
    30  (16)  CLARION COUNTY
    19990H1023B3629                 - 111 -

     1     (I)  S.R.0080
     2         (A)  I-80 WESTBOUND REHABILITATION BETWEEN
     3             S.R.2007 AND WILLIAMSBURG, BEAVER,
     4             PAINT AND MONROE TOWNSHIPS                    464,000
     5             (BASE PROJECT ALLOCATION - $464,000)
     6         (B)  I-80 FROM BUTLER COUNTY LINE TO
     7             JEFFERSON COUNTY LINE, PAVEMENT
     8             RESTORATION, BRIDGE REHABILITATION AND
     9             SAFETY IMPROVEMENTS                         2,850,000
    10             (BASE PROJECT ALLOCATION - $2,800,000)
    11             (DESIGN AND CONTINGENCIES - $50,000)
    12         (C)  PAVEMENT AND SAFETY IMPROVEMENTS TO
    13             CLARION REST AREAS, WEIGHT STATIONS AND
    14             CROSSOVERS                                    392,000
    15             (BASE PROJECT ALLOCATION - $92,000)
    16             (DESIGN AND CONTINGENCIES - $300,000)
    17         (D)  I-80, BUTLER COUNTY LINE, EAST TO
    18             JEFFERSON COUNTY LINE, COUNTYWIDE ITS
    19             SAFETY IMPROVEMENT                            315,000
    20             (BASE PROJECT ALLOCATION - $300,000)
    21             (DESIGN AND CONTINGENCIES - $15,000)
    22     (II)  PA 68
    23         (A)  PA 68/U.S.322 INTERSECTION, CLARION
    24             BOROUGH, INTERSECTION IMPROVEMENT             360,000
    25             (BASE PROJECT ALLOCATION - $160,000)
    26             (LAND ALLOCATION - $20,000)
    27             (DESIGN AND CONTINGENCIES - $180,000)
    28         (B)  PA 68, FROM EXIT 9 TO MAIN STREET,
    29             MONROE AND CLARION TOWNSHIPS,
    30             RECONSTRUCTION                              1,800,000
    19990H1023B3629                 - 112 -

     1             (BASE PROJECT ALLOCATION - $1,600,000)
     2             (LAND ALLOCATION - $100,000)
     3             (DESIGN AND CONTINGENCIES - $100,000)
     4         (C)  INTERSECTION OF PA 68 AND S.R.3012,
     5             TOBY TOWNSHIP, SAFETY IMPROVEMENT             287,000
     6             (BASE PROJECT ALLOCATION - $190,000)
     7             (LAND ALLOCATION - $40,000)
     8             (DESIGN AND CONTINGENCIES - $57,000)
     9         (D)  INTERSECTION OF PA 68 AND U.S.322,
    10             CLARION BOROUGH, SAFETY IMPROVEMENT           121,000
    11             (BASE PROJECT ALLOCATION - $80,000)
    12             (LAND ALLOCATION - $4,000)
    13             (DESIGN AND CONTINGENCIES - $37,000)
    14     (III)  WETLAND BANKING
    15         (A)  COUNTYWIDE, RECONSTRUCTION OF WETLAND
    16             BANKING                                        70,000
    17             (BASE PROJECT ALLOCATION - $40,000)
    18             (LAND ALLOCATION - $10,000)
    19             (DESIGN AND CONTINGENCIES - $20,000)
    20     (IV)  U.S.322
    21         (A)  INTERSECTION OF U.S.322 AND PA 208,
    22             SHIPPENVILLE BOROUGH, SAFETY
    23             IMPROVEMENT                                   241,000
    24             (BASE PROJECT ALLOCATION - $160,000)
    25             (LAND ALLOCATION - $40,000)
    26             (DESIGN AND CONTINGENCIES - $41,000)
    27         (B)  VENANGO COUNTY LINE TO T-890, ASHLAND
    28             AND ELK TOWNSHIPS, SAFETY IMPROVEMENT       1,391,000
    29             (BASE PROJECT ALLOCATION - $1,300,000)
    30             (LAND ALLOCATION - $40,000)
    19990H1023B3629                 - 113 -

     1             (DESIGN AND CONTINGENCIES - $51,000)
     2  (17)  CLEARFIELD COUNTY
     3     (I)  S.R.0080
     4         (A)  I-80 FROM CENTRE COUNTY LINE TO
     5             JEFFERSON COUNTY LINE, PAVEMENT
     6             RESTORATION, BRIDGE REHABILITATION AND
     7             SAFETY IMPROVEMENTS                         4,250,000
     8             (BASE PROJECT ALLOCATION - $4,200,000)
     9             (DESIGN AND CONTINGENCIES - $50,000)
    10     (II)  S.R.0879
    11         (A)  SAFETY IMPROVEMENTS, RECONSTRUCTION
    12             AND NEW CONNECTOR ROAD, S.R.0879 AND
    13             RIDGE AVENUE, S.R.3013, CURWENSVILLE
    14             BOROUGH AND PIKE TOWNSHIP                   4,000,000
    15             (BASE PROJECT ALLOCATION - $3,500,000)
    16             (LAND ALLOCATION - $150,000)
    17             (DESIGN AND CONTINGENCIES - $350,000)
    18  (18)  CLINTON COUNTY
    19     (I)  S.R.1001
    20         (A)  IMPROVEMENTS FROM S.R.0664 TO QUEENS
    21             RUN, VILLAGE OF LOCKPORT                    1,230,000
    22             (BASE PROJECT ALLOCATION - $1,100,000)
    23             (LAND ALLOCATION - $90,000)
    24             (DESIGN AND CONTINGENCIES - $40,000)
    25     (II)  S.R.0080
    26         (A)  I-80 FROM UNION COUNTY LINE TO CENTRE
    27             COUNTY LINE, PAVEMENT RESTORATION,
    28             BRIDGE REHABILITATION AND SAFETY
    29             IMPROVEMENTS                                2,450,000
    30             (BASE PROJECT ALLOCATION - $2,400,000)
    19990H1023B3629                 - 114 -

     1             (DESIGN AND CONTINGENCIES - $50,000)
     2     (III)  S.R.0220
     3         (A)  U.S.220 FROM LYCOMING COUNTY LINE TO
     4             SALONA, PAVEMENT RESTORATION, BRIDGE
     5             REHABILITATION AND SAFETY IMPROVEMENTS      1,450,000
     6             (BASE PROJECT ALLOCATION - $1,400,000)
     7             (DESIGN AND CONTINGENCIES - $50,000)
     8     (IV)  NEW ROAD CONSTRUCTION
     9         (A)  NEW ROAD CONSTRUCTION FROM ROUTE 220
    10             INTO AVIS INDUSTRIAL PARK, PINE CREEK
    11             TOWNSHIP                                    5,350,000
    12             (BASE PROJECT ALLOCATION - $4,500,000)
    13             (LAND ALLOCATION - $200,000)
    14             (DESIGN AND CONTINGENCIES - $650,000)
    15     (V)  S.R.2028
    16         (A)  S.R.2028, INDUSTRIAL PARK ACCESS ROAD,
    17             NEW ROADWAY                                   870,000
    18             (BASE PROJECT ALLOCATION - $730,000)
    19             (LAND ALLOCATION - $40,000)
    20             (DESIGN AND CONTINGENCIES - $100,000)
    21  (19)  COLUMBIA COUNTY
    22     (I)  S.R.0080
    23         (A)  I-80 FROM MONTOUR COUNTY LINE TO
    24             LUZERNE COUNTY LINE, PAVEMENT
    25             RESTORATION, BRIDGE REHABILITATION AND
    26             SAFETY IMPROVEMENTS                         1,950,000
    27             (BASE PROJECT ALLOCATION - $1,900,000)
    28             (DESIGN AND CONTINGENCIES - $50,000)
    29     (II)  S.R.0054 AND S.R.0061
    30         (A)  CONYNGHAM TOWNSHIP, RECONSTRUCTION
    19990H1023B3629                 - 115 -

     1             AND/OR RELOCATION OF S.R.0054
     2             APPROXIMATELY 0.7 MILES NORTH OF THE
     3             COLUMBIA/SCHUYLKILL COUNTY LINE             7,000,000
     4             (BASE PROJECT ALLOCATION - $6,000,000)
     5             (LAND ALLOCATION - $100,000)
     6             (DESIGN AND CONTINGENCIES - $900,000)
     7     (III)  S.R.0044
     8         (A)  HEMLOCK TOWNSHIP, RECONSTRUCTION
     9             AND/OR RELOCATION OF S.R.0044 AT THE
    10             INTERSECTION WITH PEPPERMILL ROAD
    11             S.R.4012 FROM THE INTERSECTION OF LOVER
    12             DRIVE, TR-487 NORTH TO THE
    13             HEMLOCK/MADISON TOWNSHIP LINE               4,000,000
    14             (BASE PROJECT ALLOCATION - $3,000,000)
    15             (LAND ALLOCATION - $500,000)
    16             (DESIGN AND CONTINGENCIES - $500,000)
    17     (IV)  S.R.0011
    18         (A)  BRIAR CREEK AND BERWICK BOROUGH,
    19             IMPROVEMENTS FROM BRIAR CREEK TO
    20             COLUMBIA/LUZERNE COUNTY LINE               78,000,000
    21             (BASE PROJECT ALLOCATION - $66,000,000)
    22             (LAND ALLOCATION - $6,000,000)
    23             (DESIGN AND CONTINGENCIES - $6,000,000)
    24         (B)  U.S.11/PA 487 INTERCHANGE TO PARK
    25             STREET, CITY OF BLOOMSBURG, RECONSTRUCT
    26             INTERSECTION                                  250,000
    27             (BASE PROJECT ALLOCATION - $150,000)
    28             (DESIGN AND CONTINGENCIES - $100,000)
    29         (C)  INTERCHANGE OF U.S.11 AND PA 42, CITY
    30             OF BLOOMSBURG, SIGNING                         11,000
    19990H1023B3629                 - 116 -

     1             (DESIGN AND CONTINGENCIES - $11,000)
     2     (V)  PA 42 AND PA 44
     3         (A)  PA 42, I-80 TO SCHOOL HOUSE ROAD, PA
     4             44, HEMLOCK TOWNSHIP, PATCHING,
     5             GRINDING AND OVERLAY                          405,000
     6             (BASE PROJECT ALLOCATION - $220,000)
     7             (DESIGN AND CONTINGENCIES - $185,000)
     8     (VI)  S.R.0487
     9         (A)  CATAWISSA BOROUGH AND FRANKLIN
    10             TOWNSHIP, RELOCATION AND NEW
    11             CONSTRUCTION OF S.R.0487 NEAR RIDER
    12             ROAD, T-344 AND MCINTYRE ROAD, T-393        6,500,000
    13             (BASE PROJECT ALLOCATION - $5,000,000)
    14             (LAND ALLOCATION - $1,000,000)
    15             (DESIGN AND CONTINGENCIES - $500,000)
    16  (20)  CRAWFORD COUNTY
    17     (I)  S.R.0027
    18         (A)  IMPROVEMENTS FROM LITTLE SUGAR CREEK
    19             BRIDGE TO TOWNSHIP LINE AT FRENCHTOWN,
    20             SAFETY IMPROVEMENT                            271,000
    21             (BASE PROJECT ALLOCATION - $126,000)
    22             (LAND ALLOCATION - $50,000)
    23             DESIGN AND CONTINGENCIES - $95,000)
    24     (II)  S.R.0077
    25         (A)  PA 77 AND PA 408 INTERSECTION, WIDEN
    26             AND ADD TURN LANE AT LOWER CREST              135,000
    27             (BASE PROJECT ALLOCATION - $120,000)
    28             (LAND ALLOCATION - $6,000)
    29             (DESIGN AND CONTINGENCIES - $9,000)
    30     (III)  S.R.0079
    19990H1023B3629                 - 117 -

     1         (A)  I-79 FROM MERCER COUNTY LINE TO ERIE
     2             COUNTY LINE, PAVEMENT RESTORATION,
     3             BRIDGE REHABILITATION AND SAFETY
     4             IMPROVEMENTS                               11,000,000
     5             (BASE PROJECT ALLOCATION - $10,000,000)
     6             (DESIGN AND CONTINGENCIES - $1,000,000)
     7     (IV)  PA 408
     8         (A)  PA 408 STRAWBRIDGE ROAD TO PA 428 AND
     9             STEADMAN ROAD TO SHINER ROAD, WIDEN AND
    10             STRAIGHTEN ROADWAY                            325,000
    11             (BASE PROJECT ALLOCATION - $265,000)
    12             (LAND ALLOCATION - $40,000)
    13             (DESIGN AND CONTINGENCIES - $20,000)
    14  (21)  CUMBERLAND COUNTY
    15     (I)  S.R.0011
    16         (A)  REALIGN LAMB'S GAP ROAD WITH SILVER
    17             SPRING ROAD AT THEIR INTERSECTION WITH
    18             U.S.11, SILVER SPRING TOWNSHIP              4,875,000
    19             (BASE PROJECT ALLOCATION - $4,250,000)
    20             (LAND ALLOCATION - $250,000)
    21             (DESIGN AND CONTINGENCIES - $375,000)
    22         (B)  CONSTRUCT TURNING LANES AT
    23             INTERSECTION OF S.R.0011 AND CAVALRY
    24             ROAD, MIDDLESEX TOWNSHIP                      120,000
    25             (BASE PROJECT ALLOCATION - $80,000)
    26             (LAND ALLOCATION - $10,000)
    27             (DESIGN AND CONTINGENCIES - $30,000)
    28         (C)  CONSTRUCT TURNING LANES AT
    29             INTERSECTION OF S.R.0011 AND HARMONY
    30             HALL/WOLF'S BRIDGE ROAD, MIDDLESEX
    19990H1023B3629                 - 118 -

     1             TOWNSHIP                                      120,000
     2             (BASE PROJECT ALLOCATION - $80,000)
     3             (LAND ALLOCATION - $10,000)
     4             (DESIGN AND CONTINGENCIES - $30,000)
     5     (II)  S.R.0034
     6         (A)  HOLLY PIKE INTERSECTION WITH S.R.0174,
     7             SOUTH MIDDLETON TOWNSHIP                      195,000
     8             (BASE PROJECT ALLOCATION - $40,000)
     9             (LAND ALLOCATION - $30,000)
    10             (DESIGN AND CONTINGENCIES - $125,000)
    11     (III)  S.R.0081
    12         (A)  I-81 CARLISLE WEST, PREVENTIVE
    13             MAINTENANCE, STONEHOUSE ROAD TO
    14             PETERSBURG ROAD                             1,210,000
    15             (BASE PROJECT ALLOCATION - $1,000,000)
    16             (LAND ALLOCATION - $10,000)
    17             (DESIGN AND CONTINGENCIES - $200,000)
    18         (B)  INTERSECTION IMPROVEMENTS AT I-81
    19             NORTHBOUND RAMP AND S.R.0074, MIDDLESEX
    20             TOWNSHIP                                       50,000
    21             (BASE PROJECT ALLOCATION - $40,000)
    22             (DESIGN AND CONTINGENCIES - $10,000)
    23         (C)  INTERSECTION IMPROVEMENTS AT I-81
    24             SOUTHBOUND RAMP AND S.R.0074, MIDDLESEX
    25             TOWNSHIP                                       50,000
    26             (BASE PROJECT ALLOCATION - $40,000)
    27             (DESIGN AND CONTINGENCIES - $10,000)
    28         (D)  INTERSECTION IMPROVEMENTS AT I-81
    29             SOUTHBOUND RAMP AND S.R.0641, MIDDLESEX
    30             TOWNSHIP                                       50,000
    19990H1023B3629                 - 119 -

     1             (BASE PROJECT ALLOCATION - $40,000)
     2             (DESIGN AND CONTINGENCIES - $10,000)
     3         (E)  I-81 FROM DAUPHIN COUNTY LINE TO
     4             FRANKLIN COUNTY LINE, PAVEMENT
     5             RESTORATION, BRIDGE REHABILITATION AND
     6             SAFETY IMPROVEMENTS                         3,950,000
     7             (BASE PROJECT ALLOCATION - $3,900,000)
     8             (DESIGN AND CONTINGENCIES - $50,000)
     9         (F)  S.R.0081, REBUILDING OF EXIT 12 RAMP      13,400,000
    10             (DESIGN AND CONTINGENCIES - $1,200,000)
    11             (LAND ALLOCATION - $2,200,000)
    12             (DESIGN AND CONTINGENCIES -
    13             $10,000,000)
    14         (G)  S.R.0081, REBUILDING OF EXITS 15 AND
    15             16 RAMPS                                    3,000,000
    16             (BASE PROJECT ALLOCATION - $2,000,000)
    17             (LAND ALLOCATION - $800,000
    18             (DESIGN AND CONTINGENCIES - $200,000)
    19     (IV)  S.R.0083
    20         (A)  I-83 FROM YORK COUNTY LINE TO DAUPHIN
    21             COUNTY LINE, PAVEMENT RESTORATION,
    22             BRIDGE REHABILITATION AND SAFETY
    23             IMPROVEMENTS                                  350,000
    24             (BASE PROJECT ALLOCATION - $300,000)
    25             (DESIGN AND CONTINGENCIES - $50,000)
    26     (V)  S.R.0015
    27         (A)  U.S.15 FROM YORK COUNTY LINE TO PA
    28             581, PAVEMENT RESTORATION, BRIDGE
    29             REHABILITATION AND SAFETY IMPROVEMENTS        750,000
    30             (BASE PROJECT ALLOCATION - $700,000)
    19990H1023B3629                 - 120 -

     1             (DESIGN AND CONTINGENCIES - $50,000)
     2     (VI)  S.R.0581
     3         (A)  S.R.0581 FROM I-83 TO I-81, PAVEMENT
     4             RESTORATION, BRIDGE REHABILITATION AND
     5             SAFETY IMPROVEMENTS                           850,000
     6             (BASE PROJECT ALLOCATION - $800,000)
     7             (DESIGN AND CONTINGENCIES - $50,000)
     8         (B)  S.R.0581, ADDITIONAL EXIT RAMPS           12,500,000
     9             (BASE PROJECT ALLOCATION - $8,500,000)
    10             (LAND ALLOCATION - $1,500,000)
    11             (DESIGN AND CONTINGENCIES - $2,500,000)
    12     (VII)  S.R.1013
    13         (A)  WIDENING OF S.R.1013 AND REALIGNMENT
    14             WITH SILVER CREEK ROAD, HAMPDEN
    15             TOWNSHIP                                    1,500,000
    16             (BASE PROJECT ALLOCATION - $1,000,000)
    17             (LAND ALLOCATION - $250,000)
    18             (DESIGN AND CONTINGENCIES - $250,000)
    19     (VIII)  S.R.0074
    20         (A)  INTERSECTION IMPROVEMENTS AT S.R.0074
    21             AND FORGE ROAD, MIDDLESEX TOWNSHIP             50,000
    22             (BASE PROJECT ALLOCATION - $40,000)
    23             (DESIGN AND CONTINGENCIES - $10,000)
    24         (B)  CONSTRUCT TURNING LANES AND
    25             INTERSECTION IMPROVEMENTS AT S.R.0074
    26             AND FAIRVIEW DRIVE, MIDDLESEX TOWNSHIP        160,000
    27             (BASE PROJECT ALLOCATION - $100,000)
    28             (LAND ALLOCATION - $20,000)
    29             (DESIGN AND CONTINGENCIES - $40,000)
    30     (IX)  S.R.0641
    19990H1023B3629                 - 121 -

     1         (A)  CONSTRUCT TURNING LANES AT S.R.0641
     2             AND FAIRVIEW LANE, MIDDLESEX TOWNSHIP         120,000
     3             (BASE PROJECT ALLOCATION - $80,000)
     4             (LAND ALLOCATION - $10,000)
     5             (DESIGN AND CONTINGENCIES - $30,000)
     6     (X)  FAIRVIEW DRIVE
     7         (A)  INTERSECTION IMPROVEMENTS AT FAIRVIEW
     8             DRIVE AND CLAREMONT ROAD, MIDDLESEX
     9             TOWNSHIP                                       50,000
    10             (BASE PROJECT ALLOCATION - $40,000)
    11             (DESIGN AND CONTINGENCIES - $10,000)
    12     (XI)  S.R.0696
    13         (A)  CONSTRUCTION OF AN INTERCONNECTION OF
    14             PA 696 SOUTH WITH PA 696 NORTH TO
    15             FACILITATE TRAFFIC FLOW INTO AND
    16             EXITING FROM THE BOROUGH OF
    17             SHIPPENSBURG, SHIPPENSBURG TOWNSHIP AND
    18             SOUTHAMPTON TOWNSHIP                       10,000,000
    19     (XII)  S.R.0944
    20         (A)  S.R.0944, WIDENING OF WERTZVILLE ROAD
    21             THROUGHOUT CUMBERLAND COUNTY, FROM
    22             ROUTE 15 TO PERRY COUNTY LINE               7,200,000
    23             (BASE PROJECT ALLOCATION - $5,000,000)
    24             (LAND ALLOCATION - $1,500,000)
    25             (DESIGN AND CONTINGENCIES - $700,000)
    26     (XIII)  ST. JOHN'S ROAD
    27         (A)  REALIGN INTERSECTION OF ST. JOHN'S
    28             CHURCH ROAD AND MAIN STREET, HAMPDEN
    29             TOWNSHIP                                      150,000
    30             (BASE PROJECT ALLOCATION - $150,000)
    19990H1023B3629                 - 122 -

     1  (22)  DAUPHIN COUNTY
     2     (I)  S.R.0422
     3         (A)  SIGNALIZATION AND REALIGNMENT OF
     4             INTERSECTIONS WITH U.S.422, U.S.322,
     5             S.R.0743 AND S.R.2016, DERRY TOWNSHIP       8,000,000
     6             (BASE PROJECT ALLOCATION - $8,000,000)
     7         (B)  INTERSECTION IMPROVEMENTS AND
     8             UPGRADING OF CHOCOLATE AVENUE, DERRY
     9             TOWNSHIP                                    3,700,000
    10             (BASE PROJECT ALLOCATION - $2,440,000)
    11             (LAND ALLOCATION - $600,000)
    12             (DESIGN AND CONTINGENCIES - $660,000)
    13         (C)  ACCESS IMPROVEMENTS, CHOCOLATE AVENUE;
    14             DEVELOP INTERMODAL TRANSPORTATION
    15             CENTER, DERRY TOWNSHIP                     11,250,000
    16             (BASE PROJECT ALLOCATION - $8,750,000)
    17             (LAND ALLOCATION - $900,000)
    18             (DESIGN AND CONTINGENCIES - $1,600,000)
    19     (II)  HERSHEY PARK DRIVE EXTENSION
    20         (A)  RELOCATION OF HERSHEY PARK DRIVE FROM
    21             S.R.0743 AND LINGLE AVENUE, DERRY
    22             TOWNSHIP                                    1,400,000
    23             (BASE PROJECT ALLOCATION - $900,000)
    24             (LAND ALLOCATION - $100,000)
    25             (DESIGN AND CONTINGENCIES - $400,000)
    26     (III)  S.R.0022
    27         (A)  U.S.22 FROM ELMERTON AVENUE TO PERRY
    28             COUNTY LINE, PAVEMENT RESTORATION,
    29             BRIDGE REHABILITATION AND SAFETY
    30             IMPROVEMENTS                                  950,000
    19990H1023B3629                 - 123 -

     1             (BASE PROJECT ALLOCATION - $900,000)
     2             (DESIGN AND CONTINGENCIES - $50,000)
     3     (IV)  S.R.0081
     4         (A)  I-81 FROM LEBANON COUNTY LINE TO
     5             CUMBERLAND COUNTY LINE, PAVEMENT
     6             RESTORATION, BRIDGE REHABILITATION AND
     7             SAFETY IMPROVEMENTS                         1,750,000
     8             (BASE PROJECT ALLOCATION - $1,700,000)
     9             (DESIGN AND CONTINGENCIES - $50,000)
    10     (V)  S.R.0083
    11         (A)  I-83 FROM CUMBERLAND COUNTY LINE TO I-
    12             81, PAVEMENT RESTORATION, BRIDGE
    13             REHABILITATION AND SAFETY IMPROVEMENTS        950,000
    14             (BASE PROJECT ALLOCATION - $900,000)
    15             (DESIGN AND CONTINGENCIES - $50,000)
    16     (VI)  S.R.0743
    17         (A)  RELOCATION OF PARK AVENUE, DERRY
    18             TOWNSHIP                                    3,965,000
    19             (BASE PROJECT ALLOCATION - $2,215,000)
    20             (LAND ALLOCATION - $900,000)
    21             (DESIGN AND CONTINGENCIES - $850,000)
    22     (VII)  S.R.0283
    23         (A)  I-283 FROM PENNSYLVANIA TURNPIKE TO I-
    24             83, PAVEMENT RESTORATION, BRIDGE
    25             REHABILITATION AND SAFETY IMPROVEMENTS        350,000
    26             (BASE PROJECT ALLOCATION - $300,000)
    27             (DESIGN AND CONTINGENCIES - $50,000)
    28         (B)  S.R.0283 FROM LANCASTER COUNTY LINE TO
    29             I-283 JUNCTION, PAVEMENT RESTORATION,
    30             BRIDGE REHABILITATION AND SAFETY
    19990H1023B3629                 - 124 -

     1             IMPROVEMENTS                                1,050,000
     2             (BASE PROJECT ALLOCATION - $1,000,000)
     3             (DESIGN AND CONTINGENCIES - $50,000)
     4         (C)  AIRPORT EXTENSION FROM AIRPORT TO PA
     5             283 EAST/WEST JUNCTION, PAVEMENT
     6             RESTORATION, BRIDGE REHABILITATION AND
     7             SAFETY IMPROVEMENTS                           250,000
     8             (BASE PROJECT ALLOCATION - $200,000)
     9             (DESIGN AND CONTINGENCIES - $50,000)
    10     (VIII)  S.R.0322
    11         (A)  U.S.322 FROM HERSHEY TO I-83 JUNCTION,
    12             PAVEMENT RESTORATION, BRIDGE
    13             REHABILITATION AND SAFETY IMPROVEMENTS        850,000
    14             (BASE PROJECT ALLOCATION - $800,000)
    15             (DESIGN AND CONTINGENCIES - $50,000)
    16     (IX)  S.R.2019
    17         (A)  WIDEN AND INTERSECTION IMPROVEMENTS ON
    18             NYES ROAD                                   7,500,000
    19             (BASE PROJECT ALLOCATION - $6,000,000)
    20             (LAND ALLOCATION - $500,000)
    21             (DESIGN AND CONTINGENCIES - $1,000,000)
    22     (X)  S.R.0022
    23         (A)  IMPROVEMENTS TO INTERSECTION OF
    24             S.R.0022 AND MANOR ROAD, WEST HANOVER
    25             TOWNSHIP                                    1,140,000
    26             (BASE PROJECT ALLOCATION - $900,000)
    27             (LAND ALLOCATION - $90,000)
    28             (DESIGN AND CONTINGENCIES - $150,000)
    29     (XI)  MARKET STREET
    30         (A)  RESTORE AND UPGRADE MARKET STREET
    19990H1023B3629                 - 125 -

     1             BRIDGE STRUCTURE, INCLUDING LIGHTING
     2             AND AMENITIES, CITY OF HARRISBURG             688,000
     3     (XII)  S.R.2036
     4         (A)  PA 743/S.R.2012 INTERSECTION TO LINGLE
     5             AVENUE, DERRY TOWNSHIP, NEW ROADWAY         8,394,000
     6             (BASE PROJECT ALLOCATION - $6,394,000)
     7             (LAND ALLOCATION - $1,600,000)
     8             (DESIGN AND CONTINGENCIES - $400,000)
     9     (XIII)  S.R.0209
    10         (A)  BOROUGH OF MILLERSBURG, UNION STREET
    11             FROM THE MILLERSBURG SQUARE TO WALNUT
    12             STREET, PAVEMENT RESTORATION AND
    13             DRAINAGE                                       30,000
    14  (23)  DAUPHIN AND CUMBERLAND COUNTIES
    15     (I)  CAPITAL BELTWAY
    16         (A)  I-81/I-83 INCIDENT MANAGEMENT/ITS)         3,015,000
    17             (BASE PROJECT ALLOCATION - $3,000,000)
    18             (DESIGN AND CONTINGENCIES - $15,000)
    19  (24)  DELAWARE COUNTY
    20     (I)  S.R.0003
    21         (A)  IMPROVEMENTS FROM NORTH LAWRENCE ROAD
    22             TO U.S.1, HAVERFORD TOWNSHIP                  800,000
    23             (BASE PROJECT ALLOCATION - $776,000)
    24             (LAND ALLOCATION - $16,000)
    25             (DESIGN AND CONTINGENCIES - $8,000)
    26     (II)  S.R.2006
    27         (A)  IMPROVEMENTS TO MACDADE BOULEVARD FROM
    28             I-476 TO FAIRVIEW ROAD, RIDLEY
    29             TOWNSHIP                                      126,000
    30             (BASE PROJECT ALLOCATION - $100,000)
    19990H1023B3629                 - 126 -

     1             (LAND ALLOCATION - $2,000)
     2             (DESIGN AND CONTINGENCIES - $24,000)
     3     (III)  S.R.0001
     4         (A)  U.S.1 FROM PA 320 TO PA 352, PAVEMENT
     5             RESTORATION, BRIDGE REHABILITATION AND
     6             SAFETY IMPROVEMENTS                           450,000
     7             (BASE PROJECT ALLOCATION - $400,000)
     8             (DESIGN AND CONTINGENCIES - $50,000)
     9         (B)  U.S.1/U.S.322, INTERCHANGE AND ACCESS
    10             IMPROVEMENTS                                5,000,000
    11             (BASE PROJECT ALLOCATION - $3,750,000)
    12             (LAND ALLOCATION - $625,000)
    13             (DESIGN AND CONTINGENCIES - $625,000)
    14         (C)  U.S.1/PENNSYLVANIA TURNPIKE/STREET
    15             ROAD, INTERCHANGE AND ACCESS
    16             IMPROVEMENTS                               10,000,000
    17             (BASE PROJECT ALLOCATION - $8,000,000)
    18             (LAND ALLOCATION - $1,000,000)
    19             (DESIGN AND CONTINGENCIES - $1,000,000)
    20     (IV)  S.R.0095
    21         (A)  I-95 FROM PHILADELPHIA COUNTY LINE TO
    22             DELAWARE STATE LINE, PAVEMENT
    23             RESTORATION, BRIDGE REHABILITATION AND
    24             SAFETY IMPROVEMENTS                         1,150,000
    25             (BASE PROJECT ALLOCATION - $1,100,000)
    26             (DESIGN AND CONTINGENCIES - $50,000)
    27     (V)  S.R.0322
    28         (A)  U.S.322 FROM C. BARRY BRIDGE TO
    29             S.R.3016, PAVEMENT RESTORATION, BRIDGE
    30             REHABILITATION AND SAFETY IMPROVEMENTS        350,000
    19990H1023B3629                 - 127 -

     1             (BASE PROJECT ALLOCATION - $300,000)
     2             (DESIGN AND CONTINGENCIES - $50,000)
     3     (VI)  S.R.0476
     4         (A)  I-476 FROM I-95 TO MONTGOMERY COUNTY
     5             LINE, PAVEMENT RESTORATION, BRIDGE
     6             REHABILITATION AND SAFETY IMPROVEMENTS      1,450,000
     7             (BASE PROJECT ALLOCATION - $1,400,000)
     8             (DESIGN AND CONTINGENCIES - $50,000)
     9  (25)  ERIE COUNTY
    10     (I)  S.R.0079
    11         (A)  I-79 FROM CRAWFORD COUNTY LINE TO BAY
    12             FRONT, PAVEMENT RESTORATION, BRIDGE
    13             REHABILITATION AND SAFETY IMPROVEMENTS      2,050,000
    14             (BASE PROJECT ALLOCATION - $2,000,000)
    15             (DESIGN AND CONTINGENCIES - $50,000)
    16     (II)  S.R.0090
    17         (A)  I-90 FROM NEW YORK STATE LINE TO OHIO
    18             STATE LINE, PAVEMENT RESTORATION,
    19             BRIDGE REHABILITATION AND SAFETY
    20             IMPROVEMENTS                               18,000,000
    21             (BASE PROJECT ALLOCATION - $16,000,000)
    22             (DESIGN AND CONTINGENCIES - $2,000,000)
    23         (B)  I-79, FROM BAYFRONT TO MERCER COUNTY
    24             LINE, PAVEMENT AND SAFETY IMPROVEMENTS      8,800,000
    25             (BASE PROJECT ALLOCATION - $8,000,000)
    26             (DESIGN AND CONTINGENCIES - $800,000)
    27     (III)  U.S.19
    28         (A)  U.S.19 FROM ROBINSON ROAD (S.R.4024)
    29             TO OLIVER ROAD (S.R.4008), WIDEN
    30             ROADWAY                                       700,000
    19990H1023B3629                 - 128 -

     1             (BASE PROJECT ALLOCATION - $500,000)
     2             (LAND ALLOCATION - $100,000)
     3             (DESIGN AND CONTINGENCIES - $100,000)
     4         (B)  INTERSECTION OF U.S.19 AND I-90,
     5             INTERSECTION IMPROVEMENT                    4,935,000
     6             (BASE PROJECT ALLOCATION - $4,000,000)
     7             (LAND ALLOCATION - $400,000)
     8             (DESIGN AND CONTINGENCIES - $535,000)
     9         (C)  U.S.19 FROM I-90 TO ROBINSON ROAD,
    10             RECONSTRUCTION                                620,000
    11             (BASE PROJECT ALLOCATION - $400,000)
    12             (LAND ALLOCATION - $120,000)
    13             (DESIGN AND CONTINGENCIES - $100,000)
    14     (IV)  U.S.20
    15         (A)  U.S.20 FROM WATER STREET TO NAGLE
    16             ROAD, WESLEYVILLE BOROUGH AND
    17             HABORCREEK TOWNSHIP, RESURFACE                123,000
    18             (BASE PROJECT ALLOCATION - $108,000)
    19             (DESIGN AND CONTINGENCIES - $15,000)
    20         (B)  INTERSECTION OF U.S.20 AND PA 98, ADD
    21             LEFT TURN LANE                                200,000
    22             (BASE PROJECT ALLOCATION - $160,000)
    23             (LAND ALLOCATION - $20,000)
    24             (DESIGN AND CONTINGENCIES - $20,000)
    25         (C)  INTERSECTION OF U.S.20 AND PA 98,
    26             FAIRVIEW TOWNSHIP, SAFETY IMPROVEMENT         320,000
    27             (BASE PROJECT ALLOCATION - $200,000)
    28             (LAND ALLOCATION - $80,000)
    29             (DESIGN AND CONTINGENCIES - $40,000)
    30     (V)  PA 531
    19990H1023B3629                 - 129 -

     1         (A)  PA 531 FROM I-90 TO U.S.20,
     2             HARBORCREEK TOWNSHIP, WIDEN ROADWAY         1,000,000
     3             (BASE PROJECT ALLOCATION - $900,000)
     4             (LAND ALLOCATION - $75,000)
     5             (DESIGN AND CONTINGENCIES - $25,000)
     6     (VI)  S.R.4024
     7         (A)  S.R.4024 FROM TR-99 TO ROBISON ROAD,
     8             RELOCATION                                    960,000
     9             (BASE PROJECT ALLOCATION - $480,000)
    10             (LAND ALLOCATION - $400,000)
    11             (DESIGN AND CONTINGENCIES - $80,000)
    12     (VII)  S.R.4026
    13         (A)  S.R.4026 FROM U.S.19 (PEACH STREET) TO
    14             PA 505 (PERRY HIGHWAY), MILLCREEK AND
    15             SUMMIT TOWNSHIPS, RECONSTRUCTION              200,000
    16             (BASE PROJECT ALLOCATION - $180,000)
    17             (LAND ALLOCATION - $10,000)
    18             (DESIGN AND CONTINGENCIES - $10,000)
    19     (VIII)  ORE DOCK ACCESS ROAD
    20         (A)  FROM THE BAYFRONT HIGHWAY 0.44 MILES
    21             NORTH, RELOCATION                           1,280,000
    22             (BASE PROJECT ALLOCATION - $1,120,000)
    23             (LAND ALLOCATION - $40,000)
    24             (DESIGN AND CONTINGENCIES - $120,000)
    25  (26)  FAYETTE COUNTY
    26     (I)  S.R.0040
    27         (A)  WIDEN S.R.0040 AND REDESIGN AND
    28             CONSTRUCT INTERCHANGE OF S.R.0040 AND
    29             S.R.0119, SOUTH UNION TOWNSHIP, NORTH
    30             UNION TOWNSHIP AND CITY OF UNIONTOWN        9,750,000
    19990H1023B3629                 - 130 -

     1             (BASE PROJECT ALLOCATION - $8,000,000)
     2             (LAND ALLOCATION - $500,000)
     3             (DESIGN AND CONTINGENCIES - $1,250,000)
     4         (B)  WIDEN S.R.0040 FROM S.R.0119 TO DUCK
     5             HOLLOW ROAD, SOUTH UNION TOWNSHIP AND
     6             NORTH UNION TOWNSHIP                        4,350,000
     7             (BASE PROJECT ALLOCATION - $3,500,000)
     8             (LAND ALLOCATION - $250,000)
     9             (DESIGN AND CONTINGENCIES - $600,000)
    10         (C)  EXTEND MATTHEW DRIVE FROM S.R.0040 TO
    11             DUCK HOLLOW ROAD, SOUTH UNION TOWNSHIP      3,350,000
    12             (BASE PROJECT ALLOCATION - $1,250,000)
    13             (LAND ALLOCATION - $1,900,000)
    14             (DESIGN AND CONTINGENCIES - $200,000)
    15         (D)  U.S.40, FROM PA 166 TO MORGAN STREET,
    16             SAFETY IMPROVEMENT/CENTER TURN LANE           126,000
    17             (BASE PROJECT ALLOCATION - $100,000)
    18             (LAND ALLOCATION - $10,000)
    19             (DESIGN AND CONTINGENCIES - $16,000)
    20     (II)  S.R.4006
    21         (A)  WIDEN S.R.4006 FROM S.R.0040 TO
    22             MATTHEW DRIVE, SOUTH UNION TOWNSHIP         1,450,000
    23             (BASE PROJECT ALLOCATION - $1,000,000)
    24             (LAND ALLOCATION - $250,000)
    25             (DESIGN AND CONTINGENCIES - $200,000)
    26     (III)  S.R.4003 AND S.R.4020
    27         (A)  IMPROVEMENTS, UPGRADES AND EXTENSIONS,
    28             LUZERNE TOWNSHIP                            6,500,000
    29     (IV)  S.R.4020
    30         (A)  S.R.4020 FROM PRISON ENTRANCE TO PA
    19990H1023B3629                 - 131 -

     1             166, LUZERNE TOWNSHIP, RESTORATION          1,000,000
     2             (BASE PROJECT ALLOCATION - $840,000)
     3             (LAND ALLOCATION - $100,000)
     4             (DESIGN AND CONTINGENCIES - $60,000)
     5         (B)  PRISON ENTRANCE TO PA 166, LUZERNE
     6             TOWNSHIP, RESTORATION                       1,000,000
     7             (BASE PROJECT ALLOCATION - $840,000)
     8             (LAND ALLOCATION - $100,000)
     9             (DESIGN AND CONTINGENCIES - $60,000)
    10     (V)  U.S.119
    11         (A)  MORGANTOWN INTERCHANGE, SOUTH UNION
    12             TOWNSHIP, RECONSTRUCTION                      630,000
    13             (BASE PROJECT ALLOCATION - $500,000)
    14             (LAND ALLOCATION - $60,000)
    15             (DESIGN AND CONTINGENCIES - $70,000)
    16     (VI)  S.R.2027
    17         (A)  INTERSECTION OF S.R.2027 AND S.R.1020,
    18             SAFETY IMPROVEMENT                             19,000
    19             (BASE PROJECT ALLOCATION - $16,000)
    20             (LAND ALLOCATION - $1,000)
    21             (DESIGN AND CONTINGENCIES - $2,000)
    22     (VII)  S.R.3019
    23         (A)  INTERSECTION OF S.R.3019 AND WALNUT
    24             HILL ROAD, SAFETY IMPROVEMENT/ADD TURN
    25             LANES                                         160,000
    26             (BASE PROJECT ALLOCATION - $120,000)
    27             (LAND ALLOCATION - $20,000)
    28             (DESIGN AND CONTINGENCIES - $20,000)
    29     (VIII)  S.R.6040
    30         (A)  UNIONTOWN CENTRAL BUSINESS DISTRICT,
    19990H1023B3629                 - 132 -

     1             CITY OF UNIONTOWN, SAFETY
     2             IMPROVEMENT/SIGNAL IMPROVEMENT                110,000
     3             (BASE PROJECT ALLOCATION - $80,000)
     4             (LAND ALLOCATION - $10,000)
     5             (DESIGN AND CONTINGENCIES - $20,000)
     6     (IX)  SIGNAL IMPROVEMENTS
     7         (A)  COUNTYWIDE SIGNAL IMPROVEMENTS                91,000
     8             (BASE PROJECT ALLOCATION - $80,000)
     9             (LAND ALLOCATION - $1,000)
    10             (DESIGN AND CONTINGENCIES - $10,000)
    11  (27)  FOREST COUNTY
    12     (I)  S.R.0666
    13         (A)  WIDEN AND REHABILITATE S.R.0666, FROM
    14             VILLAGE OF LYNCH TO THE VILLAGE OF WHIG
    15             HILL, HOWE AND KINGSLEY TOWNSHIPS          16,500,000
    16             (BASE PROJECT ALLOCATION - $14,000,000)
    17             (LAND ALLOCATION - $1,000,000)
    18             (DESIGN AND CONTINGENCIES - $1,500,000)
    19     (II)  S.R.0948
    20         (A)  WIDEN AND RESURFACE S.R.0948 FROM
    21             WARREN COUNTY LINE TO BROOKSTON             1,390,000
    22             (BASE PROJECT ALLOCATION - $1,300,000)
    23             (DESIGN AND CONTINGENCIES - $90,000)
    24     (III)  S.R.0899
    25         (A)  WIDEN AND RESURFACE S.R.0899 FROM
    26             S.R.0066 TO CLARION COUNTY LINE             6,000,000
    27             (BASE PROJECT ALLOCATION - $5,250,000)
    28             (DESIGN AND CONTINGENCIES - $750,000)
    29  (28)  FRANKLIN COUNTY
    30     (I)  S.R.0081
    19990H1023B3629                 - 133 -

     1         (A)  I-81 RECONDITION LEVEL 4 FROM NORTH OF
     2             SCOTLAND TO CUMBERLAND COUNTY LINE          2,154,000
     3             (BASE PROJECT ALLOCATION - $2,032,000)
     4             (LAND ALLOCATION - $1,000)
     5             (DESIGN AND CONTINGENCIES - $121,000)
     6         (B)  I-81 FROM CUMBERLAND COUNTY LINE TO
     7             MARYLAND STATE LINE, PAVEMENT
     8             RESTORATION, BRIDGE REHABILITATION AND
     9             SAFETY IMPROVEMENTS                         2,650,000
    10             (BASE PROJECT ALLOCATION - $2,600,000)
    11             (DESIGN AND CONTINGENCIES - $50,000)
    12         (C)  I-81 AT EXIT 2, INTERCHANGE
    13             IMPROVEMENTS, ANTRIM TOWNSHIP               1,865,000
    14             (BASE PROJECT ALLOCATION - $1,700,000)
    15             (LAND ALLOCATION - $15,000)
    16             (DESIGN AND CONTINGENCIES - $150,000)
    17  (29)  FULTON COUNTY
    18     (I)  S.R.0030
    19         (A)  U.S.30 FROM NEAR S.R.1006 TO
    20             S.R.1004/OLIVER DRIVE, PAVEMENT
    21             RESTORATION, BRIDGE REHABILITATION AND
    22             SAFETY IMPROVEMENTS                           450,000
    23             (BASE PROJECT ALLOCATION - $400,000)
    24             (DESIGN AND CONTINGENCIES - $50,000)
    25     (II)  S.R.0070
    26         (A)  I-70 FROM MARYLAND STATE LINE TO
    27             BEDFORD COUNTY LINE, PAVEMENT
    28             RESTORATION, BRIDGE REHABILITATION AND
    29             SAFETY IMPROVEMENTS                         2,050,000
    30             (BASE PROJECT ALLOCATION - $2,000,000)
    19990H1023B3629                 - 134 -

     1             (DESIGN AND CONTINGENCIES - $50,000)
     2  (30)  GREENE COUNTY
     3     (I)  S.R.0021
     4         (A)  IMPROVEMENTS TO ROUTE 21 AT KIWI ROAD,
     5             RECONSTRUCTION AND EXTENSION OF KIWI
     6             ROAD, AND SIGNALIZATION UPGRADE OF I-79
     7             RAMP INTERSECTIONS                          1,729,000
     8             (BASE PROJECT ALLOCATION - $1,504,000)
     9             (DESIGN AND CONTINGENCIES - $225,000)
    10         (B)  DEVELOPMENT OF A CONNECTOR ROAD FROM
    11             S.R.0021 TO NEMACOLIN, CUMBERLAND
    12             TOWNSHIP AND MONONGAHELA TOWNSHIP             500,000
    13             (BASE PROJECT ALLOCATION - $400,000)
    14             (DESIGN AND CONTINGENCIES - $100,000)
    15     (II)  TR-624
    16         (A)  AREFORD BOULEVARD, EXTEND 2-LANE
    17             BLACKTOP WITH CUL-DE-SAC 1/4 MILE,
    18             CARMICHAELS BOROUGH                           300,000
    19     (III)  S.R.0209 (R.D.1)
    20         (A)  EXTEND ACCESS ROAD TO INDUSTRIAL PARK
    21             1/2 MILE, MOUNT MORRIS, PERRY TOWNSHIP        650,000
    22     (IV)  S.R.0079
    23         (A)  I-79 FROM WEST VIRGINIA STATE LINE TO
    24             WASHINGTON COUNTY LINE, PAVEMENT
    25             RESTORATION, BRIDGE REHABILITATION AND
    26             SAFETY IMPROVEMENTS                         2,250,000
    27             (BASE PROJECT ALLOCATION - $2,200,000)
    28             (DESIGN AND CONTINGENCIES - $50,000)
    29     (V)  U.S.19
    30         (A)  U.S.19/PA 221 INTERSECTION, SAFETY
    19990H1023B3629                 - 135 -

     1             IMPROVEMENT                                    50,000
     2             (BASE PROJECT ALLOCATION - $20,000)
     3             (LAND ALLOCATION - $20,000)
     4             (DESIGN AND CONTINGENCIES - $10,000)
     5         (B)  U.S.19/PA 221 INTERSECTION, CONSTRUCT
     6             PARK AND RIDE LOT                             120,000
     7             (BASE PROJECT ALLOCATION - $100,000)
     8             (LAND ALLOCATION - $10,000)
     9             (DESIGN AND CONTINGENCIES - $10,000)
    10     (VI)  PA 88
    11         (A)  INTERSECTIONS AT S.R.1006 AND
    12             S.R.1021, CARMICHAELS BOROUGH, SAFETY
    13             IMPROVEMENTS                                   38,000
    14             (BASE PROJECT ALLOCATION - $34,000)
    15             (DESIGN AND CONTINGENCIES - $4,000)
    16  (31)  HUNTINGDON COUNTY
    17     (I)  S.R.3047
    18         (A)  TURN LANE AND SIGNALIZATION OF SOUTH
    19             4TH STREET, HUNTINGDON BOROUGH                 90,000
    20             (BASE PROJECT ALLOCATION - $70,000)
    21             (LAND ALLOCATION - $5,000)
    22             (DESIGN AND CONTINGENCIES - $15,000)
    23     (II)  U.S.22
    24         (A)  INTERSECTION OF U.S.22 AND PA 655
    25             (VALLEY STREET), MILL CREEK BOROUGH,
    26             SAFETY IMPROVEMENT                              9,000
    27             (BASE PROJECT ALLOCATION - $7,000)
    28             (LAND ALLOCATION - $1,000)
    29             (DESIGN AND CONTINGENCIES - $1,000)
    30  (32)  INDIANA COUNTY
    19990H1023B3629                 - 136 -

     1     (I)  S.R.0119
     2         (A)  U.S.119 FROM TWO LICK TO S.R.1010,
     3             PAVEMENT RESTORATION, BRIDGE
     4             REHABILITATION AND SAFETY IMPROVEMENTS        850,000
     5             (BASE PROJECT ALLOCATION - $800,000)
     6             (DESIGN AND CONTINGENCIES - $50,000)
     7         (B)  U.S.119, FROM PA 56 TO SNYDER LANE,
     8             BURRELL AND CENTER TOWNSHIPS, ADD
     9             LANES                                       9,600,000
    10             (BASE PROJECT ALLOCATION - $8,000,000)
    11             (LAND ALLOCATION - $800,000)
    12             (DESIGN AND CONTINGENCIES - $800,000)
    13     (II)  S.R.0422
    14         (A)  U.S.422 FROM PIKES PEAK TO U.S.119,
    15             PAVEMENT RESTORATION, BRIDGE
    16             REHABILITATION AND SAFETY IMPROVEMENTS        950,000
    17             (BASE PROJECT ALLOCATION - $900,000)
    18             (DESIGN AND CONTINGENCIES - $50,000)
    19     (III)  ROSE STREET EXTENSION
    20         (A)  PA 286 NORTH TO S.R.4032, WHITE
    21             TOWNSHIP, RELOCATION                          671,000
    22             (BASE PROJECT ALLOCATION - $228,000)
    23             (LAND ALLOCATION - $293,000)
    24             (DESIGN AND CONTINGENCIES - $150,000)
    25     (IV)  U.S.22
    26         (A)  U.S.22 NORTH TO SNYDER LANE, BURRELL
    27             TOWNSHIP, INTERCHANGE IMPROVEMENT AND
    28             ADD LANES                                   5,745,000
    29             (BASE PROJECT ALLOCATION - $4,400,000)
    30             (DESIGN AND CONTINGENCIES - $1,345,000)
    19990H1023B3629                 - 137 -

     1         (B)  U.S.22, FROM PA 289 EAST TO FOUR-LANE
     2             SECTION, EAST AND WEST WHEATFIELD
     3             TOWNSHIPS, ADD LANES                        5,200,000
     4             (BASE PROJECT ALLOCATION - $4,000,000)
     5             (LAND ALLOCATION - $800,000)
     6             (DESIGN AND CONTINGENCIES - $400,000)
     7     (V)  WETLAND BANK
     8         (A)  WETLAND BANK, COUNTYWIDE
     9             RECONSTRUCTION OF WETLAND BANK                 71,000
    10             (BASE PROJECT ALLOCATION - $40,000)
    11             (LAND ALLOCATION - $10,000)
    12             (DESIGN AND CONTINGENCIES - $21,000)
    13     (VI)  S.R.3043
    14         (A)  FROM INTERSECTION OF S.R.3043 AND PA
    15             286 TO S.R.4032, WHITE TOWNSHIP,
    16             RELOCATION/NEW ROADWAY                        940,000
    17             (BASE PROJECT ALLOCATION - $550,000)
    18             (LAND ALLOCATION - $210,000)
    19             (DESIGN AND CONTINGENCIES - $180,000)
    20     (VII)  PA 286
    21         (A)  FROM T-813 WEST TO U.S.422, WHITE
    22             TOWNSHIP, SAFETY IMPROVEMENT                1,190,000
    23             (BASE PROJECT ALLOCATION - $900,000)
    24             (LAND ALLOCATION - $150,000)
    25             (DESIGN AND CONTINGENCIES - $140,000)
    26     (VIII)  S.R.3013
    27         (A)  INTERSECTION OF S.R.3013 AND S.R.3008,
    28             BLACKLICK TOWNSHIP, SAFETY IMPROVEMENT        146,000
    29             (BASE PROJECT ALLOCATION - $100,000)
    30             (LAND ALLOCATION - $15,000)
    19990H1023B3629                 - 138 -

     1             (DESIGN AND CONTINGENCIES - $31,000)
     2     (IX)  PA 403
     3         (A)  PA 403 JUST EAST OF THE INTERSECTION
     4             WITH PA 286, CLYMER BOROUGH, SAFETY
     5             IMPROVEMENT/RESTORATION                       146,000
     6             (BASE PROJECT ALLOCATION - $80,000)
     7             (LAND ALLOCATION - $35,000)
     8             (DESIGN AND CONTINGENCIES - $31,000)
     9  (33)  JEFFERSON COUNTY
    10     (I)  S.R.0080
    11         (A)  I-80 FROM CLEARFIELD COUNTY LINE TO
    12             CLARION COUNTY LINE, PAVEMENT
    13             RESTORATION, BRIDGE REHABILITATION AND
    14             SAFETY IMPROVEMENTS                         2,450,000
    15             (BASE PROJECT ALLOCATION - $2,400,000)
    16             (DESIGN AND CONTINGENCIES - $50,000)
    17         (B)  I-80, CLARION COUNTY TO CLEARFIELD
    18             COUNTY, COUNTYWIDE ITS, SAFETY
    19             IMPROVEMENT                                   270,000
    20             (BASE PROJECT ALLOCATION - $260,000)
    21             (DESIGN AND CONTINGENCIES - $10,000)
    22     (II)  WETLAND BANKING
    23         (A)  COUNTYWIDE, RECONSTRUCTION OF WETLAND
    24             BANKING                                        70,000
    25             (BASE PROJECT ALLOCATION - $40,000)
    26             (LAND ALLOCATION - $10,000)
    27             (DESIGN AND CONTINGENCIES - $20,000)
    28     (III)  PA 36
    29         (A)  INTERSECTION OF PA 36 AND PA 949,
    30             VILLAGE OF SIGEL, ELDRED TOWNSHIP,
    19990H1023B3629                 - 139 -

     1             SAFETY IMPROVEMENTS                           206,000
     2             (BASE PROJECT ALLOCATION - $130,000)
     3             (LAND ALLOCATION - $40,000)
     4             (DESIGN AND CONTINGENCIES - $36,000)
     5     (IV)  U.S.119
     6         (A)  INTERSECTION OF U.S.119 AND PA 410,
     7             HENDERSON TOWNSHIP, RESTORATION               330,000
     8             (BASE PROJECT ALLOCATION - $200,000)
     9             (LAND ALLOCATION - $60,000)
    10             (DESIGN AND CONTINGENCIES - $70,000)
    11     (V)  PA 28
    12         (A)  INTERSECTION OF PA 28 AND S.R.1011,
    13             SNYDER TOWNSHIP, SAFETY IMPROVEMENT           310,000
    14             (BASE PROJECT ALLOCATION - $180,000)
    15             (LAND ALLOCATION - $60,000)
    16             (DESIGN AND CONTINGENCIES - $70,000)
    17         (B)  FROM T-434 (MILLIRON ROAD) TO PINE
    18             CREEK/WARSAW TOWNSHIP LINE, PINE CREEK
    19             TOWNSHIP, SAFETY IMPROVEMENT                  275,000
    20             (BASE PROJECT ALLOCATION - $180,000)
    21             (LAND ALLOCATION - $20,000)
    22             (DESIGN AND CONTINGENCIES - $75,000)
    23     (VI)  PA 536
    24         (A)  INTERSECTION OF PA 536 AND S.R.3001,
    25             RINGGOLD TOWNSHIP, SAFETY IMPROVEMENT         250,000
    26             (BASE PROJECT ALLOCATION - $160,000)
    27             (LAND ALLOCATION - $40,000)
    28             (DESIGN AND CONTINGENCIES - $50,000)
    29     (VII)  U.S.119
    30         (A)  U.S.119 AND T-841 INTERSECTION
    19990H1023B3629                 - 140 -

     1             (PUNXSUTAWNEY AIRPORT), BELL TOWNSHIP,
     2             SAFETY IMPROVEMENT AND ADD LEFT TURN
     3             LANE                                          255,000
     4             (BASE PROJECT ALLOCATION - $150,000)
     5             (LAND ALLOCATION - $30,000)
     6             (DESIGN AND CONTINGENCIES - $75,000)
     7     (VIII)  PA 830
     8         (A)  FROM PA 830/S.R.1006 INTERSECTION TO
     9             S.R.1006/T-548 INTERSECTION, WASHINGTON
    10             TOWNSHIP, RECONSTRUCTION AND
    11             RELOCATION                                    940,000
    12             (BASE PROJECT ALLOCATION - $800,000
    13             (LAND ALLOCATION - $80,000)
    14             (DESIGN AND CONTINGENCIES - $60,000)
    15  (34)  JUNIATA COUNTY
    16     (I)  S.R.0022
    17         (A)  U.S.22 FROM PERRY COUNTY LINE TO
    18             MACEDONIA, PAVEMENT RESTORATION, BRIDGE
    19             REHABILITATION AND SAFETY IMPROVEMENTS      1,850,000
    20             (BASE PROJECT ALLOCATION - $1,800,000)
    21             (DESIGN AND CONTINGENCIES - $50,000)
    22  (35)  LACKAWANNA COUNTY
    23     (I)  S.R.0247
    24         (A)  MOOSIC MOUNTAIN BUSINESS PARK              1,655,000
    25             (BASE PROJECT ALLOCATION - $1,525,000)
    26             (LAND ALLOCATION - $10,000)
    27             (DESIGN AND CONTINGENCIES - $120,000)
    28     (II)  S.R.0011
    29         (A)  U.S.11 FROM WYOMING AVENUE TO I-81,
    30             PAVEMENT RESTORATION, BRIDGE
    19990H1023B3629                 - 141 -

     1             REHABILITATION AND SAFETY IMPROVEMENTS        650,000
     2             (BASE PROJECT ALLOCATION - $600,000)
     3             (DESIGN AND CONTINGENCIES - $50,000)
     4     (III)  S.R.0006
     5         (A)  U.S.6, LACKAWANNA VALLEY INDUSTRIAL
     6             HIGHWAY FROM I-81/I-84/I-380 JUNCTION
     7             TO CARBONDALE, PAVEMENT RESTORATION,
     8             BRIDGE REHABILITATION AND SAFETY
     9             IMPROVEMENTS                                1,550,000
    10             (BASE PROJECT ALLOCATION - $1,500,000)
    11             (DESIGN AND CONTINGENCIES - $50,000)
    12         (B)  OFFICE MAX TO TIMBER FALLS, DICKSON
    13             CITY AND BLAKELY BOROUGH, RESTORATION
    14             AND WIDENING                                  542,000
    15             (BASE PROJECT ALLOCATION - $482,000)
    16             (LAND ALLOCATION - $40,000)
    17             (DESIGN AND CONTINGENCIES - $20,000)
    18     (IV)  S.R.0081
    19         (A)  I-81 FROM LUZERNE COUNTY LINE TO
    20             SUSQUEHANNA COUNTY LINE, PAVEMENT
    21             RESTORATION, BRIDGE REHABILITATION AND
    22             SAFETY IMPROVEMENTS                         2,750,000
    23             (BASE PROJECT ALLOCATION - $2,700,000)
    24             (DESIGN AND CONTINGENCIES - $50,000)
    25     (V)  S.R.0084
    26         (A)  I-84 FROM WAYNE COUNTY LINE TO I-81,
    27             PAVEMENT RESTORATION, BRIDGE
    28             REHABILITATION AND SAFETY IMPROVEMENTS      1,350,000
    29             (BASE PROJECT ALLOCATION - $1,300,000)
    30             (DESIGN AND CONTINGENCIES - $50,000)
    19990H1023B3629                 - 142 -

     1     (VI)  S.R.0307
     2         (A)  S.R.0307 FROM I-81 TO U.S.11, PAVEMENT
     3             RESTORATION, BRIDGE REHABILITATION AND
     4             SAFETY IMPROVEMENTS                           150,000
     5             (BASE PROJECT ALLOCATION - $100,000)
     6             (DESIGN AND CONTINGENCIES - $50,000)
     7     (VII)  S.R.0380
     8         (A)  I-380 FROM MONROE COUNTY LINE TO I-81,
     9             PAVEMENT RESTORATION, BRIDGE
    10             REHABILITATION AND SAFETY IMPROVEMENTS      1,150,000
    11             (BASE PROJECT ALLOCATION - $1,100,000)
    12             (DESIGN AND CONTINGENCIES - $50,000)
    13     (VIII)  S.R.3011
    14         (A)  KEYSER AVENUE FROM TAYLOR-OLD FORGE
    15             LINE TO TAYLOR-SCRANTON LINE, STORM
    16             WATER MANAGEMENT SYSTEM AND ROAD
    17             RECONSTRUCTION, BOROUGH OF TAYLOR           2,400,000
    18             (BASE PROJECT ALLOCATION - $2,000,000)
    19             (DESIGN AND CONTINGENCIES - $400,000)
    20         (B)  KEYSER AVENUE FROM SCRANTON-TAYLOR
    21             LINE TO WEST MARKET STREET, STORM WATER
    22             MANAGEMENT SYSTEM AND ROAD
    23             RECONSTRUCTION, CITY OF SCRANTON            3,000,000
    24             (BASE PROJECT ALLOCATION - $2,500,000)
    25             (DESIGN AND CONTINGENCIES - $500,000)
    26         (C)  KEYSER AVENUE, STORM WATER MANAGEMENT
    27             PROJECT FROM LOOP STREET TO PHILO
    28             STREET INCLUDING, BUT NOT LIMITED TO,
    29             CONSTRUCTION OF STORM SEWERS AND PIPING
    30             ALONG KEYSER AVENUE, LOOP STREET AND
    19990H1023B3629                 - 143 -

     1             NORTH-SOUTH ROAD AND CONSTRUCTION OF
     2             WATER RETENTION POND OF UNNAMED
     3             TRIBUTARY OF KEYSER CREEK TRAVELING
     4             UNDERNEATH KEYSER AVENUE, S.R.3011,
     5             CITY OF SCRANTON                            1,600,000
     6             (DESIGN AND CONTINGENCIES - $300,000)
     7             (BASE PROJECT ALLOCATION - $1,300,000)
     8     (IX)  S.R.3003
     9         (A)  JACKSON STREET FROM KEYSER AVENUE TO
    10             NEWTON ROAD, CONSTRUCTION OF STORM
    11             WATER MANAGEMENT SYSTEM, CITY OF
    12             SCRANTON                                      840,000
    13             (BASE PROJECT ALLOCATION - $700,000)
    14             (DESIGN AND CONTINGENCIES - $140,000)
    15         (B)  NEWTON ROAD FROM JACKSON STREET TO
    16             SCRANTON-NEWTON TOWNSHIP LINE,
    17             CONSTRUCTION OF STORM WATER MANAGEMENT
    18             SYSTEM, CITY OF SCRANTON                    2,400,000
    19             (BASE PROJECT ALLOCATION - $2,000,000)
    20             (DESIGN AND CONTINGENCIES - $400,000)
    21     (X)  S.R.3010
    22         (A)  UNION STREET FROM MAIN STREET TO
    23             KEYSER AVENUE, ROAD RECONSTRUCTION AND
    24             CONSTRUCTION OF STORM WATER MANAGEMENT
    25             SYSTEM INCLUDING, BUT NOT LIMITED TO,
    26             STORM SEWERS, STORM WATER PIPING,
    27             CURBING, SIDEWALKS, PUMPING STATIONS
    28             AND ACQUISITION OF PROPERTY, BOROUGH OF
    29             TAYLOR                                      2,400,000
    30             (BASE PROJECT ALLOCATION - $2,000,000)
    19990H1023B3629                 - 144 -

     1             (DESIGN AND CONTINGENCIES - $400,000)
     2     (XI)  S.R.3012
     3         (A)  OAK STREET FROM MAIN STREET TO KEYSER
     4             AVENUE, CONSTRUCTION OF STORM WATER
     5             MANAGEMENT SYSTEM, BOROUGH OF TAYLOR        1,200,000
     6             (BASE PROJECT ALLOCATION - $1,000,000)
     7             (DESIGN AND CONTINGENCIES - $200,000)
     8     (XII)  S.R.3013
     9         (A)  MAIN STREET FROM TAYLOR-OLD FORGE LINE
    10             TO TAYLOR-SCRANTON LINE, ROAD
    11             RECONSTRUCTION AND STORM WATER
    12             MANAGEMENT SYSTEM, BOROUGH OF TAYLOR        1,200,000
    13             (BASE PROJECT ALLOCATION - $1,000,000)
    14             (DESIGN AND CONTINGENCIES - $200,000)
    15         (B)  MAIN AVENUE FROM SCRANTON-TAYLOR LINE
    16             TO WEST MARKET STREET, ROAD
    17             RECONSTRUCTION AND STORM WATER
    18             MANAGEMENT SYSTEM, CITY OF SCRANTON         1,800,000
    19             (BASE PROJECT ALLOCATION - $1,500,000)
    20             (DESIGN AND CONTINGENCIES - $300,000)
    21     (XIII)  S.R.3014
    22         (A)  LUZERNE STREET FROM MAIN AVENUE TO
    23             KEYSER AVENUE, ROAD RECONSTRUCTION AND
    24             STORM WATER MANAGEMENT SYSTEM INCLUDING
    25             CURBING, CITY OF SCRANTON                   1,200,000
    26             (BASE PROJECT ALLOCATION - $1,000,000)
    27             (DESIGN AND CONTINGENCIES - $200,000)
    28     (XIV)  S.R.3029
    29         (A)  PROVIDENCE ROAD FROM OLIVE STREET TO
    30             NORTH MAIN AVENUE, CONSTRUCTION OF
    19990H1023B3629                 - 145 -

     1             STORM WATER MANAGEMENT SYSTEM, CITY OF
     2             SCRANTON                                    1,900,000
     3             (BASE PROJECT ALLOCATION - $1,600,000)
     4             (DESIGN AND CONTINGENCIES - $300,000)
     5     (XV)  S.R.3033
     6         (A)  OAK STREET FROM KEYSER AVENUE TO NORTH
     7             SCRANTON EXPRESSWAY, ROAD
     8             RECONSTRUCTION AND STORM WATER
     9             MANAGEMENT SYSTEM, CITY OF SCRANTON         1,200,000
    10             (BASE PROJECT ALLOCATION - $1,000,000)
    11             (DESIGN AND CONTINGENCIES - $200,000)
    12     (XVI)  S.R.0347
    13         (A)  CYPRESS STREET FROM THROOP-OLYPHANT
    14             LINE TO THROOP-DUNMORE LINE, ROAD
    15             RECONSTRUCTION AND CONSTRUCTION OF
    16             STORM WATER MANAGEMENT SYSTEM, BOROUGH
    17             OF THROOP                                   1,200,000
    18             (BASE PROJECT ALLOCATION - $1,000,000)
    19             (DESIGN AND CONTINGENCIES - $200,000)
    20         (B)  DUNMORE STREET FROM THROOP-OLYPHANT
    21             LINE TO THROOP-DUNMORE LINE, ROAD
    22             RECONSTRUCTION AND CONSTRUCTION OF
    23             STORM WATER MANAGEMENT SYSTEM, BOROUGH
    24             OF THROOP                                   1,200,000
    25             (BASE PROJECT ALLOCATION - $1,000,000)
    26             (DESIGN AND CONTINGENCIES - $200,000)
    27         (C)  BLAKELY STREET FROM DRINKER STREET TO
    28             DUNMORE-THROOP LINE, ROAD
    29             RECONSTRUCTION AND CONSTRUCTION OF
    30             STORM WATER MANAGEMENT SYSTEM, BOROUGH
    19990H1023B3629                 - 146 -

     1             OF DUNMORE                                  1,400,000
     2             (BASE PROJECT ALLOCATION - $1,150,000)
     3             (DESIGN AND CONTINGENCIES - $250,000)
     4     (XVII)  S.R.6011
     5         (A)  BLAKELY STREET FROM GREEN RIDGE STREET
     6             TO DUNMORE-SCRANTON LINE, ROAD
     7             RECONSTRUCTION AND CONSTRUCTION OF
     8             STORM WATER MANAGEMENT SYSTEM, BOROUGH
     9             OF DUNMORE                                  1,200,000
    10             (BASE PROJECT ALLOCATION - $1,000,000)
    11             (DESIGN AND CONTINGENCIES - $200,000)
    12         (B)  GREEN RIDGE STREET FROM MAIN AVENUE TO
    13             SCRANTON-DUNMORE LINE, CONSTRUCTION OF
    14             STORM WATER MANAGEMENT SYSTEM, CITY OF
    15             SCRANTON                                    1,200,000
    16             (BASE PROJECT ALLOCATION - $1,000,000)
    17             (DESIGN AND CONTINGENCIES - $200,000)
    18         (C)  GREEN RIDGE STREET FROM DUNMORE-
    19             SCRANTON LINE TO BLAKELY STREET,
    20             CONSTRUCTION OF STORM WATER MANAGEMENT
    21             SYSTEM, BOROUGH OF DUNMORE                  1,200,000
    22             (BASE PROJECT ALLOCATION - $1,000,000)
    23             (DESIGN AND CONTINGENCIES - $200,000)
    24     (XVIII)  S.R.2020
    25         (A)  DRINKER STREET FROM BLAKELY STREET TO
    26             I-380, CONSTRUCTION OF STORM WATER
    27             MANAGEMENT SYSTEM, BOROUGH OF DUNMORE       1,800,000
    28             (BASE PROJECT ALLOCATION - $1,500,000)
    29             (DESIGN AND CONTINGENCIES - $300,000)
    30     (XIX)  S.R.0307
    19990H1023B3629                 - 147 -

     1         (A)  MORGAN HIGHWAY FROM KEYSER AVENUE TO
     2             ABINGTON TOWNSHIP, SCRANTON LINE, ROAD
     3             RECONSTRUCTION AND CONSTRUCTION OF
     4             STORM WATER MANAGEMENT SYSTEM, CITY OF
     5             SCRANTON                                    2,000,000
     6             (BASE PROJECT ALLOCATION - $1,650,000)
     7             (DESIGN AND CONTINGENCIES - $350,000)
     8     (XX)  SAFETY IMPROVEMENTS AND SIGNALS ON THE
     9         FOLLOWING STATE HIGHWAYS: S.R.2020,
    10         S.R.6011, S.R.0347, S.R.3013, S.R.3010,
    11         S.R.3012, S.R.3011, S.R.3033, S.R.3014,
    12         S.R.3029, S.R.3003 AND S.R.0307, IN THE
    13         CITY OF SCRANTON AND THE BOROUGHS OF
    14         TAYLOR, THROOP AND DUNMORE                      2,400,000
    15             (BASE PROJECT ALLOCATION - $2,000,000)
    16             (DESIGN AND CONTINGENCIES - $400,000)
    17     (XXI)  ACQUISITION AND INSTALLATION OF WARNING
    18         DEVICES AND SAFETY IMPROVEMENTS OF HIGHWAY-
    19         RAIL GRADE CROSSINGS, 20% OF THE COST OF
    20         EACH SUCH ACQUISITION AND INSTALLATION
    21         SHALL BE PAID BY THE COMPANY, PARTY, PERSON
    22         OR PERSONS THAT OWN THE TRACT UPON WHICH
    23         THE IMPROVEMENTS ARE BEING INSTALLED, CITY
    24         OF SCRANTON, BOROUGHS OF TAYLOR, THROOP AND
    25         DUNMORE                                         3,000,000
    26             (BASE PROJECT ALLOCATION - $2,500,000)
    27             (DESIGN AND CONTINGENCIES - $500,000)
    28     (XXII)  EAST MOUNTAIN ROAD
    29         (A)  SAFETY AND DRAINAGE IMPROVEMENT ON
    30             HIGHWAY, INCLUDING SHOULDERS FROM
    19990H1023B3629                 - 148 -

     1             MOUNTAIN LAKE ROAD TO INTERSECTION I-
     2             81, CITY OF SCRANTON                        6,000,000
     3     (XXIII)  S.R.3022
     4         (A)  S.R.3022, ROARING BROOK AND CENTRAL
     5             CITY EXPRESSWAY, REPAIR RETAINING WALL        150,000
     6             (BASE PROJECT ALLOCATION - $130,000)
     7             (DESIGN AND CONTINGENCIES - $20,000)
     8     (XXIV)  PA 247 AND S.R.6247
     9         (A)  MOOSIC MOUNTAIN/VALLEY VIEW BUSINESS
    10             PARK, ARCHIBALD AND JESSUP BOROUGHS,
    11             JEFFERSON TOWNSHIP, WIDENING AND SAFETY
    12             IMPROVEMENTS                               10,400,000
    13             (BASE PROJECT ALLOCATION - $8,400,000)
    14             (LAND ALLOCATION - $500,000)
    15             (DESIGN AND CONTINGENCIES - $1,500,000)
    16         (B)  SALEM ROAD WIDENING, SAFETY
    17             IMPROVEMENTS AND ACCESS ROAD                1,430,000
    18             (BASE PROJECT ALLOCATION - $1,300,000)
    19             (DESIGN AND CONTINGENCIES - $130,000)
    20         (C)  VALLEYVIEW BUSINESS PARK, ARCHIBALD
    21             AND JESSUP BOROUGHS, NEW CONSTRUCTION       1,760,000
    22             (BASE PROJECT ALLOCATION - $1,400,000)
    23             (LAND ALLOCATION - $40,000)
    24             (DESIGN AND CONTINGENCIES - $320,000)
    25     (XXV)  I-81, I-84 AND I-380
    26         (A)  TRAFFIC CONTROL CENTER, DATA SYSTEM
    27             AND SAFETY IMPROVEMENTS, VARIOUS
    28             TOWNSHIPS TRAFFIC SAFETY IMPROVEMENTS         100,000
    29             (BASE PROJECT ALLOCATION - $100,000)
    30  (36)  LANCASTER COUNTY
    19990H1023B3629                 - 149 -

     1     (I)  S.R.0072 AND S.R.0501
     2         (A)  IMPROVEMENTS TO VARIOUS SECTIONS OF
     3             DOE RUN ROAD AND COLLECTOR                    640,000
     4             (BASE PROJECT ALLOCATION - $640,000)
     5     (II)  S.R.0222
     6         (A)  SIGNALIZATION OF INTERSECTION OF
     7             S.R.0222 AND PENNSYLVANIA TURNPIKE,
     8             EAST COCALICO TOWNSHIP                        127,000
     9             (BASE PROJECT ALLOCATION - $27,000)
    10             (DESIGN AND CONTINGENCIES - $100,000)
    11         (B)  U.S.222 FROM BERKS COUNTY LINE TO
    12             U.S.30 IN LANCASTER, PAVEMENT
    13             RESTORATION, BRIDGE REHABILITATION AND
    14             SAFETY IMPROVEMENTS                         1,850,000
    15             (BASE PROJECT ALLOCATION - $1,800,000)
    16             (DESIGN AND CONTINGENCIES - $50,000)
    17     (III)  S.R.0441 AND S.R.0462
    18         (A)  SIGNALIZATION OF 6 LOCATIONS, COLUMBIA
    19             BOROUGH                                       270,000
    20             (BASE PROJECT ALLOCATION - $40,000)
    21             (LAND ALLOCATION - $50,000)
    22             (DESIGN AND CONTINGENCIES - $180,000)
    23     (IV)  S.R.0030
    24         (A)  U.S.30 FROM GREENLAND TO YORK COUNTY
    25             LINE, PAVEMENT RESTORATION, BRIDGE
    26             REHABILITATION AND SAFETY IMPROVEMENTS      1,750,000
    27             (BASE PROJECT ALLOCATION - $1,700,000)
    28             (DESIGN AND CONTINGENCIES - $50,000)
    29         (B)  U.S.30 FROM YORK COUNTY LINE TO
    30             MOUNTVILLE BOROUGH, RESURFACE               1,609,000
    19990H1023B3629                 - 150 -

     1             (BASE PROJECT ALLOCATION - $1,309,000)
     2             (DESIGN AND CONTINGENCIES - $300,000)
     3         (C)  U.S.30 FROM MOUNTVILLE BOROUGH TO PA
     4             741, RESURFACE                              1,688,000
     5             (BASE PROJECT ALLOCATION - $1,388,000)
     6             (DESIGN AND CONTINGENCIES - $300,000)
     7     (V)  S.R.0283
     8         (A)  S.R.0283 FROM U.S.30 IN LANCASTER TO
     9             DAUPHIN COUNTY LINE, PAVEMENT
    10             RESTORATION, BRIDGE REHABILITATION AND
    11             SAFETY IMPROVEMENTS                         1,750,000
    12             (BASE PROJECT ALLOCATION - $1,700,000)
    13             (DESIGN AND CONTINGENCIES - $50,000)
    14         (B)  PA 283 FROM ELIZABETHTOWN TO PA 230,
    15             RESURFACE                                   2,581,000
    16             (BASE PROJECT ALLOCATION - $2,281,000)
    17             (DESIGN AND CONTINGENCIES - $300,000)
    18     (VI)  PA 272
    19         (A)  PA 272/PA 372, BUCK INTERSECTION, EAST
    20             DRUMORE TOWNSHIP, INTERSECTION
    21             IMPROVEMENT                                   360,000
    22             (BASE PROJECT ALLOCATION - $160,000)
    23             (LAND ALLOCATION - $100,000)
    24             (DESIGN AND CONTINGENCIES - $100,000)
    25     (VII)  PA 896
    26         (A)  PA 896 FROM STRASBURG BOROUGH TO ROUTE
    27             340, ROAD WIDENING, SHOULDER WIDENINGS
    28             AND SAFETY IMPROVEMENTS                     4,000,000
    29     (VIII)  NEWCOMER ROAD
    30         (A)  RAPHO AND MOUNT JOY TOWNSHIPS, SAFETY
    19990H1023B3629                 - 151 -

     1             IMPROVEMENTS                                   18,000
     2             (BASE PROJECT ALLOCATION - $11,000)
     3             (LAND ALLOCATION - $2,000)
     4             (DESIGN AND CONTINGENCIES - $5,000)
     5     (IX)  IRISHTOWN ROAD
     6         (A)  CONNECTOR TO HARVEST ROAD AND NORTH
     7             CHERRY LANE, LEACOCK TOWNSHIP,
     8             RELOCATION                                  1,420,000
     9             (BASE PROJECT ALLOCATION - $1,070,000)
    10             (LAND ALLOCATION - $250,000)
    11             (DESIGN AND CONTINGENCIES - $100,000)
    12     (X)  EBY CHIQUES AND NEWCOMER ROAD
    13         (A)  RAPHO TOWNSHIP, REALIGNMENT                1,232,000
    14             (BASE PROJECT ALLOCATION - $882,000)
    15             (LAND ALLOCATION - $250,000)
    16             (DESIGN AND CONTINGENCIES - $100,000)
    17  (37)  LAWRENCE COUNTY
    18     (I)  S.R.0060
    19         (A)  S.R.0060 FROM BEAVER COUNTY LINE TO
    20             MERCER COUNTY LINE, PAVEMENT
    21             RESTORATION, BRIDGE REHABILITATION AND
    22             SAFETY IMPROVEMENTS                         1,250,000
    23             (BASE PROJECT ALLOCATION - $1,200,000)
    24             (DESIGN AND CONTINGENCIES - $50,000)
    25     (II)  S.R.0079
    26         (A)  I-79 FROM BUTLER COUNTY LINE TO MERCER
    27             COUNTY LINE, PAVEMENT RESTORATION,
    28             BRIDGE REHABILITATION AND SAFETY
    29             IMPROVEMENTS                                  550,000
    30             (BASE PROJECT ALLOCATION - $500,000)
    19990H1023B3629                 - 152 -

     1             (DESIGN AND CONTINGENCIES - $50,000)
     2     (III)  S.R.0422
     3         (A)  U.S.422 FROM U.S.422/S.R.2004
     4             INTERCHANGE TO PA 60, PAVEMENT
     5             RESTORATION, BRIDGE REHABILITATION AND
     6             SAFETY IMPROVEMENTS                           650,000
     7             (BASE PROJECT ALLOCATION - $600,000)
     8             (DESIGN AND CONTINGENCIES - $50,000)
     9     (IV)  S.R.0018
    10         (A)  RESTORATION AND WIDEN S.R.0018,
    11             WILMINGTON AND NESHANNOCK TOWNSHIPS           800,000
    12             (BASE PROJECT ALLOCATION - $740,000)
    13             (DESIGN AND CONTINGENCIES - $60,000)
    14         (B)  PA 18, WALLACE AVENUE TO MAITLAND
    15             LANE, RESTORATION                             600,000
    16             (BASE PROJECT ALLOCATION - $600,000)
    17     (V)  S.R.0065
    18         (A)  WIDENING AND CONSTRUCTION TO INCLUDE A
    19             THIRD LANE, WAYNE TOWNSHIP                 38,000,000
    20     (VI)  S.R.1005
    21         (A)  INTERSECTION OF S.R.1005/MAITLAND LANE
    22             TO MERCER COUNTY LINE, RECONSTRUCTION         600,000
    23             (BASE PROJECT ALLOCATION - $600,000)
    24         (B)  MAITLAND LANE TO MERCER COUNTY LINE,
    25             NESHANNOK AND WILMINGTON TOWNSHIPS,
    26             WIDENING AND REALIGNMENT                      720,000
    27             (BASE PROJECT ALLOCATION - $600,000)
    28             (LAND ALLOCATION - $20,000)
    29             (DESIGN AND CONTINGENCIES - $100,000)
    30     (VII)  S.R.4014
    19990H1023B3629                 - 153 -

     1         (A)  UNION TOWNSHIP AND NEW CASTLE BOROUGH,
     2             RESTORATION                                   700,000
     3             (BASE PROJECT ALLOCATION - $700,000)
     4  (38)  LEBANON COUNTY
     5     (I)  S.R.0022
     6         (A)  U.S.22 FROM BERKS COUNTY LINE TO
     7             DAUPHIN COUNTY LINE, PAVEMENT
     8             RESTORATION, BRIDGE REHABILITATION AND
     9             SAFETY IMPROVEMENTS                         1,550,000
    10             (BASE PROJECT ALLOCATION - $1,500,000)
    11             (DESIGN AND CONTINGENCIES - $50,000)
    12     (II)  S.R.0078
    13         (A)  I-78 FROM BERKS COUNTY LINE TO DAUPHIN
    14             COUNTY LINE, PAVEMENT RESTORATION,
    15             BRIDGE REHABILITATION AND SAFETY
    16             IMPROVEMENTS                                  950,000
    17             (BASE PROJECT ALLOCATION - $900,000)
    18             (DESIGN AND CONTINGENCIES - $50,000)
    19     (III)  S.R.0081
    20         (A)  I-81 FROM DAUPHIN COUNTY LINE TO
    21             SCHUYLKILL COUNTY LINE, PAVEMENT
    22             RESTORATION, BRIDGE REHABILITATION AND
    23             SAFETY IMPROVEMENTS                         1,550,000
    24             (BASE PROJECT ALLOCATION - $1,500,000)
    25             (DESIGN AND CONTINGENCIES - $50,000)
    26     (IV)  S.R.2001
    27         (A)  RECONSTRUCTION AND IMPROVEMENTS AT
    28             S.R.2001 AND PA 501 INTERSECTION              401,000
    29             (BASE PROJECT ALLOCATION - $401,000)
    30  (39)  LEHIGH COUNTY
    19990H1023B3629                 - 154 -

     1     (I)  S.R.0309
     2         (A)  INTERSECTION IMPROVEMENTS WITH
     3             S.R.4010                                      400,000
     4             (BASE PROJECT ALLOCATION - $240,000)
     5             (LAND ALLOCATION - $80,000)
     6             (DESIGN AND CONTINGENCIES - $80,000)
     7         (B)  S.R.0309 FROM BUCKS COUNTY LINE TO I-
     8             78/I-78 TO U.S.22, PAVEMENT
     9             RESTORATION, BRIDGE REHABILITATION AND
    10             SAFETY IMPROVEMENTS                           750,000
    11             (BASE PROJECT ALLOCATION - $700,000)
    12             (DESIGN AND CONTINGENCIES - $50,000)
    13     (II)  S.R.1003
    14         (A)  WIDEN, RECONSTRUCTION AND INTERSECTION
    15             IMPROVEMENTS ON AIRPORT ROAD FROM
    16             U.S.22 TO CONGRESS STREET                   3,000,000
    17             (BASE PROJECT ALLOCATION - $2,400,000)
    18             (LAND ALLOCATION - $300,000)
    19             (DESIGN AND CONTINGENCIES - $300,000)
    20     (III)  S.R.1007
    21         (A)  RECONSTRUCTION OF DAUPHIN STREET FROM
    22             IRVING STREET TO UNION BOULEVARD              300,000
    23             (BASE PROJECT ALLOCATION - $200,000)
    24             (LAND ALLOCATION - $25,000)
    25             (DESIGN AND CONTINGENCIES - $75,000)
    26         (B)  RECONSTRUCTION, INTERSECTION
    27             IMPROVEMENTS AND NEW ROADWAY ON DAUPHIN
    28             STREET FROM IRVING STREET TO UNION
    29             BOULEVARD, AND LLOYD STREET CONNECTOR
    30             FROM AIRPORT ROAD TO EXISTING LLOYD
    19990H1023B3629                 - 155 -

     1             STREET                                      3,900,000
     2             (BASE PROJECT ALLOCATION - $2,800,000)
     3             (LAND ALLOCATION - $525,000)
     4             (DESIGN AND CONTINGENCIES - $575,000)
     5     (IV)  S.R.9900
     6         (A)  LLOYD STREET CONNECTOR FROM AIRPORT
     7             ROAD TO EXISTING LLOYD STREET, NEW
     8             ROADWAY                                     3,600,000
     9             (BASE PROJECT ALLOCATION - $2,600,000)
    10             (LAND ALLOCATION - $500,000)
    11             (DESIGN AND CONTINGENCIES - $500,000)
    12     (V)  AMERICAN PARKWAY
    13         (A)  FOUR-LANE RELOCATION OF AMERICAN
    14             PARKWAY BETWEEN AMERICAN BOULEVARD AND
    15             S.R.0987                                   12,540,000
    16             (BASE PROJECT ALLOCATION - $11,280,000)
    17             (LAND ALLOCATION - $450,000)
    18             (DESIGN AND CONTINGENCIES - $810,000)
    19         (B)  AMERICAN BOULEVARD NORTHEAST TO
    20             S.R.0987, CITY OF ALLENTOWN                12,540,000
    21             (BASE PROJECT ALLOCATION - $11,280,000)
    22             (LAND ALLOCATION - $450,000)
    23             (DESIGN AND CONTINGENCIES - $810,000)
    24     (VI)  S.R.0022
    25         (A)  U.S.22 FROM NORTHAMPTON COUNTY LINE TO
    26             I-78 JUNCTION, PAVEMENT RESTORATION,
    27             BRIDGE REHABILITATION AND SAFETY
    28             IMPROVEMENTS                                1,050,000
    29             (BASE PROJECT ALLOCATION - $1,000,000)
    30             (DESIGN AND CONTINGENCIES - $50,000)
    19990H1023B3629                 - 156 -

     1     (VII)  S.R.0078
     2         (A)  I-78 FROM NORTHAMPTON COUNTY LINE TO
     3             BERKS COUNTY LINE, PAVEMENT
     4             RESTORATION, BRIDGE REHABILITATION AND
     5             SAFETY IMPROVEMENTS                         1,950,000
     6             (BASE PROJECT ALLOCATION - $1,900,000)
     7             (DESIGN AND CONTINGENCIES - $50,000)
     8     (VIII)  S.R.0378
     9         (A)  S.R.0378 FROM NORTHAMPTON COUNTY LINE
    10             TO U.S.22, PAVEMENT RESTORATION, BRIDGE
    11             REHABILITATION AND SAFETY IMPROVEMENTS        450,000
    12             (BASE PROJECT ALLOCATION - $400,000)
    13             (DESIGN AND CONTINGENCIES - $50,000)
    14  (40)  LUZERNE COUNTY
    15     (I)  S.R.0093
    16         (A)  IMPROVEMENTS TO BROAD STREET, CITY OF
    17             HAZLETON                                    1,682,000
    18             (BASE PROJECT ALLOCATION - $1,346,000)
    19             (DESIGN AND CONTINGENCIES - $336,000)
    20     (II)  S.R.0011
    21         (A)  U.S.11 FROM I-81 AIRPORT TO S.R.2021,
    22             PAVEMENT RESTORATION, BRIDGE
    23             REHABILITATION AND SAFETY IMPROVEMENTS        350,000
    24             (BASE PROJECT ALLOCATION - $300,000)
    25             (DESIGN AND CONTINGENCIES - $50,000)
    26     (III)  S.R.0029
    27         (A)  S.R.0029 FROM I-81 ASHLEY TO U.S.11
    28             WEST NANTICOKE, PAVEMENT RESTORATION,
    29             BRIDGE REHABILITATION AND SAFETY
    30             IMPROVEMENTS                                2,000,000
    19990H1023B3629                 - 157 -

     1             (BASE PROJECT ALLOCATION - $1,940,000)
     2             (DESIGN AND CONTINGENCIES - $60,000)
     3     (IV)  S.R.0080
     4         (A)  I-80 FROM MONROE COUNTY LINE TO
     5             COLUMBIA COUNTY LINE, PAVEMENT
     6             RESTORATION, BRIDGE REHABILITATION AND
     7             SAFETY IMPROVEMENTS                         2,650,000
     8             (BASE PROJECT ALLOCATION - $2,600,000)
     9             (DESIGN AND CONTINGENCIES - $50,000)
    10         (B)  I-80, EASTBOUND/WESTBOUND LANES,
    11             PAVEMENT RESTORATION                          400,000
    12             (BASE PROJECT ALLOCATION - $380,000)
    13             (DESIGN AND CONTINGENCIES - $20,000)
    14     (V)  S.R.0081
    15         (A)  I-81 FROM SCHUYLKILL COUNTY LINE TO
    16             LACKAWANNA COUNTY LINE, PAVEMENT
    17             RESTORATION, BRIDGE REHABILITATION AND
    18             SAFETY IMPROVEMENTS                         3,950,000
    19             (BASE PROJECT ALLOCATION - $3,900,000)
    20             (DESIGN AND CONTINGENCIES - $50,000)
    21         (B)  I-81, RECONSTRUCT EXIT 49, AVOCA
    22             BOROUGH, INTERCHANGE IMPROVEMENT            2,000,000
    23             (BASE PROJECT ALLOCATION - $1,600,000)
    24             (LAND ALLOCATION - $200,000)
    25             (DESIGN AND CONTINGENCIES - $200,000)
    26     (VI)  S.R.0309
    27         (A)  S.R.0309 FROM I-81 WILKES-BARRE TO
    28             TRUCKSVILLE, PAVEMENT RESTORATION,
    29             BRIDGE REHABILITATION AND SAFETY
    30             IMPROVEMENTS                                  650,000
    19990H1023B3629                 - 158 -

     1             (BASE PROJECT ALLOCATION - $600,000)
     2             (DESIGN AND CONTINGENCIES - $50,000)
     3         (B)  CONSTRUCTION OF 3,500 LINEAR FEET OF
     4             SOUND BARRIER ON THE NORTH SIDE OF
     5             S.R.0309 BETWEEN EXIT 1 AND EXIT 2,
     6             CITY OF WILKES-BARRE                        3,000,000
     7         (C)  PA 309, EXIT 4 TO EXIT 5, RESTORATION        450,000
     8             (BASE PROJECT ALLOCATION - $420,000)
     9             (DESIGN AND CONTINGENCIES - $30,000)
    10         (D)  PA 309 AND AIRPORT ROAD, HAZLE
    11             TOWNSHIP, IMPROVE INTERSECTION                260,000
    12             (BASE PROJECT ALLOCATION - $200,000)
    13             (LAND ALLOCATION - $20,000)
    14             (DESIGN AND CONTINGENCIES - $40,000)
    15     (VII)  S.R.2021
    16         (A)  S.R.2021 FROM U.S.11 CORK LANE TO
    17             SABASTOPOL, PAVEMENT RESTORATION,
    18             BRIDGE REHABILITATION AND SAFETY
    19             IMPROVEMENTS                                  250,000
    20             (BASE PROJECT ALLOCATION - $200,000)
    21             (DESIGN AND CONTINGENCIES - $50,000)
    22     (VIII)  PA 239
    23         (A)  MOCANAQUA ROCK REMOVAL, MOCANAQUA
    24             BOROUGH, ROCK EMBANKMENT REMOVAL              240,000
    25             (BASE PROJECT ALLOCATION - $200,000)
    26             (LAND ALLOCATION - $20,000)
    27             (DESIGN AND CONTINGENCIES - $20,000)
    28     (IX)  PA 115
    29         (A)  PA 115 AND MEADOW RUN, BEAR CREEK
    30             TOWNSHIP, INTERSECTION IMPROVEMENT            120,000
    19990H1023B3629                 - 159 -

     1             (BASE PROJECT ALLOCATION - $80,000)
     2             (LAND ALLOCATION - $20,000)
     3             (DESIGN AND CONTINGENCIES - $20,000)
     4     (X)  S.R.3026
     5         (A)  AIRPORT BELTWAY, HAZLETON BOROUGH,
     6             WIDENING                                      860,000
     7             (BASE PROJECT ALLOCATION - $800,000)
     8             (LAND ALLOCATION - $20,000)
     9             (DESIGN AND CONTINGENCIES - $40,000)
    10     (XI)  I-81 AND I-80
    11         (A)  PORTABLE MESSAGE BOARDS, DATA SYSTEM
    12             AND SAFETY IMPROVEMENT, VARIOUS
    13             TOWNSHIPS, TRAFFIC SAFETY IMPROVEMENTS        110,000
    14             (BASE PROJECT ALLOCATION - $110,000)
    15     (XII)  COAL STREET REALIGNMENT
    16         (A)  WILKES-BARRE CITY, RESTORATION, NEW
    17             CONSTRUCTION                                1,610,000
    18             (BASE PROJECT ALLOCATION - $1,400,000)
    19             (LAND ALLOCATION - $50,000)
    20             (DESIGN AND CONTINGENCIES - $160,000)
    21  (41)  LYCOMING COUNTY
    22     (I)  S.R.0180
    23         (A)  I-180 RESTORATION AND IMPROVEMENTS
    24             FROM HALLS STATION INTERCHANGE TO SOUTH
    25             MUNCY INTERCHANGE AND U.S.220/S.R.2036
    26             INTERCHANGE                                   956,000
    27             (BASE PROJECT ALLOCATION - $899,000)
    28             (DESIGN AND CONTINGENCIES - $57,000)
    29         (B)  I-180 FROM NORTHUMBERLAND COUNTY LINE
    30             TO U.S.15, PAVEMENT RESTORATION, BRIDGE
    19990H1023B3629                 - 160 -

     1             REHABILITATION AND SAFETY IMPROVEMENTS      2,050,000
     2             (BASE PROJECT ALLOCATION - $2,000,000)
     3             (DESIGN AND CONTINGENCIES - $50,000)
     4     (II)  S.R.0015
     5         (A)  U.S.15 FROM WILLIAMSPORT TO TIOGA
     6             COUNTY LINE, PAVEMENT RESTORATION,
     7             BRIDGE REHABILITATION AND SAFETY
     8             IMPROVEMENTS                                2,050,000
     9             (BASE PROJECT ALLOCATION - $2,000,000)
    10             (DESIGN AND CONTINGENCIES - $50,000)
    11         (B)  SOUTH WILLIAMSPORT TO LYCOMING/UNION
    12             COUNTY LINE, ROADWAY RECONSTRUCTION,
    13             SAFETY IMPROVEMENTS                         3,150,000
    14             (BASE PROJECT ALLOCATION - $3,000,000)
    15             (LAND ALLOCATION - $50,000)
    16             (DESIGN AND CONTINGENCIES - $100,000)
    17     (III)  S.R.0220
    18         (A)  U.S.220 FROM WILLIAMSPORT TO
    19             NISBIT/LARRYS CORNER TO CLINTON COUNTY,
    20             PAVEMENT RESTORATION, BRIDGE
    21             REHABILITATION AND SAFETY IMPROVEMENTS        850,000
    22             (BASE PROJECT ALLOCATION - $800,000)
    23             (DESIGN AND CONTINGENCIES - $50,000)
    24         (B)  U.S.220, FROM INTERSECTION WITH PA 287
    25             TO WILLIAMSPORT BELTWAY, WOODWARD
    26             TOWNSHIP, FOUR-LANE DIVIDED
    27             RELOCATION/RECONSTRUCTION AND SAFETY
    28             IMPROVEMENT                                 3,778,000
    29             (BASE PROJECT ALLOCATION - $3,251,000)
    30             (LAND ALLOCATION - $294,000)
    19990H1023B3629                 - 161 -

     1             (DESIGN AND CONTINGENCIES - $233,000)
     2         (C)  U.S.220, 4TH STREET RAMP, JERSEY SHORE
     3             BOROUGH, SAFETY IMPROVEMENT                    70,000
     4             (DESIGN AND CONTINGENCIES - $70,000)
     5         (D)  CITY OF WILLIAMSPORT AND WOODWARD
     6             TOWNSHIP, JUNCTION OF U.S.220 AND
     7             S.R.2014                                    2,500,000
     8             (BASE PROJECT ALLOCATION - $2,000,000)
     9             (LAND ALLOCATION - $200,000)
    10             (DESIGN AND CONTINGENCIES - $300,000)
    11         (E)  CITY OF WILLIAMSPORT TO JERSEY SHORE,
    12             UPGRADE TO DIVIDED LIMITED-ACCESS          20,000,000
    13             (BASE PROJECT ALLOCATION - $16,300,000)
    14             (LAND ALLOCATION - $1,500,000)
    15             (DESIGN AND CONTINGENCIES - $2,200,000)
    16     (IV)  S.R.0414
    17         (A)  BROWN TOWNSHIP, CEDAR RUN NARROWS,
    18             ROADWAY RECONSTRUCTION, RETAINING WALL      3,700,000
    19             (BASE PROJECT ALLOCATION - $2,400,000)
    20             (LAND ALLOCATION - $300,000)
    21             (DESIGN AND CONTINGENCIES - $1,000,000)
    22     (V)  TRENTON AVENUE CONNECTOR
    23         (A)  TRENTON AVENUE CONNECTOR, CITY OF
    24             WILLIAMSPORT INDUSTRIAL PARK ACCESS
    25             ROAD                                        4,500,000
    26  (42)  MCKEAN COUNTY
    27     (I)  S.R.0219
    28         (A)  UPGRADE OF BRADFORD BYPASS NORTH AND
    29             SOUTH OF BRADFORD                           8,320,000
    30             (BASE PROJECT ALLOCATION - $7,600,000)
    19990H1023B3629                 - 162 -

     1             (DESIGN AND CONTINGENCIES - $720,000)
     2         (B)  U.S.219 FROM SOUTH BRADFORD TO NEW
     3             YORK STATE LINE, PAVEMENT RESTORATION,
     4             BRIDGE REHABILITATION AND SAFETY
     5             IMPROVEMENTS                                  550,000
     6             (BASE PROJECT ALLOCATION - $500,000)
     7             (DESIGN AND CONTINGENCIES - $50,000)
     8     (II)  S.R.0060
     9         (A)  S.R.0060 FROM LAWRENCE COUNTY LINE TO
    10             PA 18 INTERSECTION, PAVEMENT
    11             RESTORATION, BRIDGE REHABILITATION AND
    12             SAFETY IMPROVEMENTS                           650,000
    13             (BASE PROJECT ALLOCATION - $600,000)
    14             (DESIGN AND CONTINGENCIES - $50,000)
    15     (III)  S.R.0079
    16         (A)  I-79 FROM LAWRENCE COUNTY LINE TO
    17             CRAWFORD COUNTY LINE, PAVEMENT
    18             RESTORATION, BRIDGE REHABILITATION AND
    19             SAFETY IMPROVEMENTS                         2,650,000
    20             (BASE PROJECT ALLOCATION - $2,600,000)
    21             (DESIGN AND CONTINGENCIES - $50,000)
    22     (IV)  S.R.0080
    23         (A)  I-80 FROM VENANGO COUNTY LINE TO OHIO
    24             STATE LINE, PAVEMENT RESTORATION,
    25             BRIDGE REHABILITATION AND SAFETY
    26             IMPROVEMENTS                                2,850,000
    27             (BASE PROJECT ALLOCATION - $2,800,000)
    28             (DESIGN AND CONTINGENCIES - $50,000)
    29     (V)  PA 59
    30         (A)  PA 59, INTERSECTION OF PA 59 AND PA
    19990H1023B3629                 - 163 -

     1             770, LAFAYETTE TOWNSHIP, INTERSECTION
     2             IMPROVEMENT                                   190,000
     3             (BASE PROJECT ALLOCATION - $160,000)
     4             (LAND ALLOCATION - $10,000)
     5             (DESIGN AND CONTINGENCIES - $20,000)
     6  (43)  MERCER COUNTY
     7     (I)  I-79
     8         (A)  I-79, LAWRENCE COUNTY LINE TO CITY OF
     9             ERIE, PAVEMENT AND SAFETY IMPROVEMENTS     11,660,000
    10             (BASE PROJECT ALLOCATION - $10,600,000)
    11             (DESIGN AND CONTINGENCIES - $1,060,000)
    12     (II)  S.R.3014
    13         (A)  S.R.3014, PA 18 TO BUHL BOULEVARD, ADD
    14             TURN LANE                                     860,000
    15             (BASE PROJECT ALLOCATION - $520,000)
    16             (LAND ALLOCATION - $320,000)
    17             (DESIGN AND CONTINGENCIES - $20,000)
    18     (III)  S.R.0018
    19         (A)  INTERSECTION IMPROVEMENTS AND
    20             UPGRADING OF MAIN STREET, BOROUGH OF
    21             GREENVILLE                                  1,191,000
    22             (BASE PROJECT ALLOCATION - $979,000)
    23             (DESIGN AND CONTINGENCIES - $212,000)
    24  (44)  MIFFLIN COUNTY
    25     (I)  S.R.0322
    26         (A)  U.S.322 FROM 322/22 SPLIT OF CENTRE
    27             COUNTY LINE, PAVEMENT RESTORATION,
    28             BRIDGE REHABILITATION AND SAFETY
    29             IMPROVEMENTS                                1,650,000
    30             (BASE PROJECT ALLOCATION - $1,600,000)
    19990H1023B3629                 - 164 -

     1             (DESIGN AND CONTINGENCIES - $50,000)
     2  (45)  MONROE COUNTY
     3     (I)  S.R.0033
     4         (A)  S.R.0033 FROM NORTHAMPTON COUNTY LINE
     5             TO I-80, PAVEMENT RESTORATION, BRIDGE
     6             REHABILITATION AND SAFETY IMPROVEMENTS      1,150,000
     7             (BASE PROJECT ALLOCATION - $1,100,000)
     8             (DESIGN AND CONTINGENCIES - $50,000)
     9     (II)  S.R.0080
    10         (A)  I-80 FROM NEW JERSEY STATE LINE TO
    11             CARBON COUNTY LINE, PAVEMENT
    12             RESTORATION, BRIDGE REHABILITATION AND
    13             SAFETY IMPROVEMENTS                         2,850,000
    14             (BASE PROJECT ALLOCATION - $2,800,000)
    15             (DESIGN AND CONTINGENCIES - $50,000)
    16         (B)  I-80 EXIT 51/FORGE ROAD/PROSPECT
    17             STREET/EAST BROWN STREET INTERCHANGE
    18             RECONFIGURATION, EAST STROUDSBURG           4,500,000
    19             (BASE PROJECT ALLOCATION - $3,700,000)
    20             (LAND ALLOCATION - $500,000)
    21             (DESIGN AND CONTINGENCIES - $300,000)
    22         (C)  I-80 EXIT 52 INTERCHANGE IMPROVEMENTS     12,000,000
    23             (BASE PROJECT ALLOCATION - $10,000,000)
    24             (LAND ALLOCATION - $1,000,000)
    25             (DESIGN AND CONTINGENCIES - $1,000,000)
    26         (D)  I-80 AND STONY HOLLOW ROAD, NEW
    27             INTERCHANGE                                11,500,000
    28             (BASE PROJECT ALLOCATION - $10,000,000)
    29             (DESIGN AND CONTINGENCIES - $1,500,000)
    30         (E)  DELAWARE WATER GAP WELCOME CENTER I-
    19990H1023B3629                 - 165 -

     1             80                                         10,000,000
     2             (BASE PROJECT ALLOCATION - $7,600,000)
     3             (LAND ALLOCATION - $400,000)
     4             (DESIGN AND CONTINGENCIES - $2,000,000)
     5     (III)  S.R.0209
     6         (A)  U.S.209 FROM PA 33 SPLIT TO I-80,
     7             PAVEMENT RESTORATION, BRIDGE
     8             REHABILITATION AND SAFETY IMPROVEMENTS        450,000
     9             (BASE PROJECT ALLOCATION - $400,000)
    10             (DESIGN AND CONTINGENCIES - $50,000)
    11         (B)  I-80 TO MARSHALLS CREEK RECONSTRUCTION
    12             AND WIDENING                                3,400,000
    13             (BASE PROJECT ALLOCATION - $3,000,000)
    14             (LAND ALLOCATION - $200,000)
    15             (DESIGN AND CONTINGENCIES - $200,000)
    16     (IV)  S.R.0611
    17         (A)  ENHANCE MOBILITY AND IMPROVE SAFETY,
    18             1,000 FEET SOUTH OF S.R.2106 TO 1,200
    19             FEET NORTH OF S.R.0033 IN STROUD
    20             TOWNSHIP                                   24,900,000
    21             (BASE PROJECT ALLOCATION - $14,000,000)
    22             (LAND ALLOCATION - $7,400,000)
    23             (DESIGN AND CONTINGENCIES - $3,500,000)
    24     (V)  S.R.0380
    25         (A)  I-380 FROM I-80 TO LACKAWANNA COUNTY
    26             LINE, PAVEMENT RESTORATION, BRIDGE
    27             REHABILITATION AND SAFETY IMPROVEMENTS      1,450,000
    28             (BASE PROJECT ALLOCATION - $1,400,000)
    29             (DESIGN AND CONTINGENCIES - $50,000)
    30  (46)  MONTGOMERY COUNTY
    19990H1023B3629                 - 166 -

     1     (I)  S.R.0030
     2         (A)  IMPROVEMENTS TO CLOSED LOOP, CITY
     3             AVENUE TO COUNTY LINE ROAD, LOWER
     4             MERION TOWNSHIP                               112,000
     5             (BASE PROJECT ALLOCATION - $100,000)
     6             (LAND ALLOCATION - $12,000)
     7     (II)  S.R.0073
     8         (A)  INTERSECTION IMPROVEMENT AT WILLOW
     9             GROVE, CHELTENHAM TOWNSHIP                    290,000
    10             (BASE PROJECT ALLOCATION - $270,000)
    11             (LAND ALLOCATION - $20,000)
    12     (III)  S.R.0663
    13         (A)  IMPROVEMENTS OF SWAMP PARK
    14             INTERSECTION WITH LAYFIELD, NEW HANOVER
    15             TOWNSHIP                                    1,133,000
    16             (BASE PROJECT ALLOCATION - $950,000)
    17             (LAND ALLOCATION - $75,000)
    18             (DESIGN AND CONTINGENCIES - $108,000)
    19     (IV)  S.R.0076
    20         (A)  I-76 FROM PHILADELPHIA COUNTY LINE TO
    21             CHESTER COUNTY LINE, PAVEMENT
    22             RESTORATION, BRIDGE REHABILITATION AND
    23             SAFETY IMPROVEMENTS                         1,350,000
    24             (BASE PROJECT ALLOCATION - $1,300,000)
    25             (DESIGN AND CONTINGENCIES - $50,000)
    26     (V)  S.R.0309
    27         (A)  S.R.0309 FROM CEDARBROOK TO S.R.2018,
    28             PAVEMENT RESTORATION, BRIDGE
    29             REHABILITATION AND SAFETY IMPROVEMENTS        950,000
    30             (BASE PROJECT ALLOCATION - $900,000)
    19990H1023B3629                 - 167 -

     1             (DESIGN AND CONTINGENCIES - $50,000)
     2     (VI)  S.R.0422
     3         (A)  U.S.422 FROM CHESTER COUNTY LINE TO
     4             BERKS COUNTY LINE, PAVEMENT
     5             RESTORATION, BRIDGE REHABILITATION AND
     6             SAFETY IMPROVEMENTS                         3,160,000
     7             (BASE PROJECT ALLOCATION - $3,000,000)
     8             (LAND ALLOCATION - $60,000)
     9             (DESIGN AND CONTINGENCIES - $100,000)
    10     (VII)  S.R.0476
    11         (A)  I-476 FROM DELAWARE COUNTY LINE TO
    12             BUCKS COUNTY LINE, PAVEMENT
    13             RESTORATION, BRIDGE REHABILITATION AND
    14             SAFETY IMPROVEMENTS                           650,000
    15             (BASE PROJECT ALLOCATION - $600,000)
    16             (DESIGN AND CONTINGENCIES - $50,000)
    17     (VIII)  UPPER PERKIOMEN INDUSTRIAL ACCESS
    18         HIGHWAY
    19         (A)  CONSTRUCTION OF A NEW INDUSTRIAL
    20             ACCESS HIGHWAY IN UPPER HANOVER
    21             TOWNSHIP                                    8,000,000
    22             (BASE PROJECT ALLOCATION - $6,000,000)
    23             (LAND ALLOCATION - $500,000)
    24             (DESIGN AND CONTINGENCIES - $1,500,000)
    25     (IX)  S.R.0363
    26         (A)  PA 363, SUMNEYTOWN PIKE AT PA 363
    27             INTERSECTION, TOWAMENCIN AND UPPER
    28             GWYNEDD TOWNSHIPS, INTERSECTION
    29             IMPROVEMENT                                 1,344,000
    30             (BASE PROJECT ALLOCATION - $1,344,000)
    19990H1023B3629                 - 168 -

     1     (X)  S.R.9900
     2         (A)  PA 9900, FORT WASHINGTON IMPROVEMENTS,
     3             UPPER DUBLIN TOWNSHIP, VARIOUS
     4             RECONSTRUCTION AND SAFETY IMPROVEMENT         196,000
     5             (BASE PROJECT ALLOCATION - $175,000)
     6             (LAND ALLOCATION - $4,000)
     7             (DESIGN AND CONTINGENCIES - $17,000)
     8         (B)  PA 9900, BUTLER PIKE AT FLOURTOWN
     9             ROAD, PLYMOUTH AND WHITEMARSH
    10             TOWNSHIPS, INTERSECTION IMPROVEMENT           220,000
    11             (BASE PROJECT ALLOCATION - $200,000)
    12             (LAND ALLOCATION - $20,000)
    13  (47)  MONTOUR COUNTY
    14     (I)  S.R.0080
    15         (A)  I-80 FROM COLUMBIA COUNTY LINE TO
    16             NORTHUMBERLAND COUNTY LINE, PAVEMENT
    17             RESTORATION, BRIDGE REHABILITATION AND
    18             SAFETY IMPROVEMENTS                         1,250,000
    19             (BASE PROJECT ALLOCATION - $1,200,000)
    20             (DESIGN AND CONTINGENCIES - $50,000)
    21     (II)  U.S.11
    22         (A)  U.S.11, WALNUT STREET AND MONTOUR
    23             BOULEVARD, RESTORATION                        650,000
    24             (BASE PROJECT ALLOCATION - $350,000)
    25             (DESIGN AND CONTINGENCIES - $300,000)
    26  (48)  NORTHAMPTON COUNTY
    27     (I)  S.R.0022
    28         (A)  U.S.22 FROM NEW JERSEY STATE LINE TO
    29             LEHIGH COUNTY LINE, PAVEMENT
    30             RESTORATION, BRIDGE REHABILITATION AND
    19990H1023B3629                 - 169 -

     1             SAFETY IMPROVEMENTS                         1,250,000
     2             (BASE PROJECT ALLOCATION - $1,200,000)
     3             (DESIGN AND CONTINGENCIES - $50,000)
     4     (II)  S.R.0033
     5         (A)  S.R.0033 FROM U.S.22 TO MONROE COUNTY
     6             LINE, PAVEMENT RESTORATION, BRIDGE
     7             REHABILITATION AND SAFETY IMPROVEMENTS      1,350,000
     8             (BASE PROJECT ALLOCATION - $1,300,000)
     9             (DESIGN AND CONTINGENCIES - $50,000)
    10     (III)  S.R.0078
    11         (A)  I-78 FROM NEW JERSEY STATE LINE TO
    12             LEHIGH COUNTY LINE, PAVEMENT
    13             RESTORATION, BRIDGE REHABILITATION AND
    14             SAFETY IMPROVEMENTS                         1,250,000
    15             (BASE PROJECT ALLOCATION - $1,200,000)
    16             (DESIGN AND CONTINGENCIES - $50,000)
    17  (49)  NORTHUMBERLAND COUNTY
    18     (I)  S.R.0061
    19         (A)  PA 61/PA 225 INTERSECTION, SHAMOKIN
    20             AND COAL TOWNSHIPS, INTERSECTION
    21             IMPROVEMENT AND NEW BRIDGE                  2,360,000
    22             (BASE PROJECT ALLOCATION - $1,800,000)
    23             (LAND ALLOCATION - $200,000)
    24             (DESIGN AND CONTINGENCIES - $360,000)
    25         (B)  MILL AND RESURFACE S.R.0061 FROM
    26             S.R.4006 TO S.R.0890                          300,000
    27         (C)  HAMILTON UNDERPASS, CITY OF SUNBURY
    28             AND UPPER AUGUSTA TOWNSHIP,
    29             RECONSTRUCTION AND/OR RELOCATION OF
    30             S.R.0061 FROM MARKET STREET IN SUNBURY
    19990H1023B3629                 - 170 -

     1             TO S.R.0890 IN UPPER AUGUSTA TOWNSHIP       6,000,000
     2             (BASE PROJECT ALLOCATION - $5,000,000)
     3             (LAND ALLOCATION - $500,000)
     4             (DESIGN AND CONTINGENCIES - $500,000)
     5     (II)  S.R.0080
     6         (A)  I-80 FROM MONTOUR COUNTY LINE TO UNION
     7             COUNTY LINE, PAVEMENT RESTORATION,
     8             BRIDGE REHABILITATION AND SAFETY
     9             IMPROVEMENTS                                  650,000
    10             (BASE PROJECT ALLOCATION - $600,000)
    11             (DESIGN AND CONTINGENCIES - $50,000)
    12     (III)  S.R.0180
    13         (A)  I-180 FROM I-80 TO LYCOMING COUNTY
    14             LINE, PAVEMENT RESTORATION, BRIDGE
    15             REHABILITATION AND SAFETY IMPROVEMENTS        950,000
    16             (BASE PROJECT ALLOCATION - $900,000)
    17             (DESIGN AND CONTINGENCIES - $50,000)
    18         (B)  RESURFACE, SHOULDER PAVEMENT AND GUIDE
    19             RAIL UPGRADE ON SECTION 049                 4,400,000
    20         (C)  I-180, FROM LYCOMING COUNTY LINE TO PA
    21             54 INTERCHANGE, RESTORATION                   518,000
    22             (BASE PROJECT ALLOCATION - $480,000)
    23             (DESIGN AND CONTINGENCIES - $38,000)
    24     (IV)  S.R.0147
    25         (A)  MILL AND RESURFACE S.R.0147, SECTION
    26             63M                                           780,000
    27     (V)  S.R.0405
    28         (A)  MILL AND RESURFACE S.R.0405 FROM
    29             CAMERON AVENUE INTERSECTION TO SEGMENT
    30             0231/1537                                     900,000
    19990H1023B3629                 - 171 -

     1     (VI)  S.R.0487
     2         (A)  MILL AND RESURFACE, SHOULDER PAVEMENT
     3             AND GUIDE RAIL UPGRADE ON S.R.0487 FROM
     4             TIMBER CREEK RESTAURANT TO S.R.0054 IN
     5             ELYSBURG                                      430,000
     6         (B)  PA 61/PA 487 TO 700 FEET EAST OF PA
     7             487/S.R.4012, SHAMOKIN TOWNSHIP,
     8             RESTORATION                                   404,000
     9             (BASE PROJECT ALLOCATION - $224,000)
    10             (LAND ALLOCATION - $30,000)
    11             (DESIGN AND CONTINGENCIES - $150,000)
    12     (VII)  S.R.0054
    13         (A)  RIVERSIDE BOROUGH AND RUSH TOWNSHIP,
    14             WIDEN FROM THE RIVERSIDE BOROUGH/RUSH
    15             TOWNSHIP LINE TO THE INTERSECTION OF
    16             S.R.2002 AND S.R.2003 WITH S.R.0054         3,200,000
    17             (BASE PROJECT ALLOCATION - $2,600,000)
    18             (LAND ALLOCATION - $100,000)
    19             (DESIGN AND CONTINGENCIES - $500,000)
    20     (VIII)  BELFORD BOULEVARD
    21         (A)  BELFORD BOULEVARD, MILTON BOROUGH AND
    22             WEST CHILLISQUAQUE TOWNSHIP, NEW 2-LANE
    23             ACCESS ROAD LYING EAST AND WEST OF
    24             S.R.1031, HOUSEL RUN ROAD                   1,000,000
    25             (BASE PROJECT ALLOCATION - $600,000)
    26             (DESIGN AND CONTINGENCIES - $400,000)
    27         (B)  EAST AND WEST OF HOUSEL RUN ROAD,
    28             CONSTRUCT A NEW 2-LANE ROADWAY                269,000
    29             (BASE PROJECT ALLOCATION - $269,000)
    30  (50)  PERRY COUNTY
    19990H1023B3629                 - 172 -

     1     (I)  S.R.0011
     2         (A)  U.S.11 FROM SPUR LANE TO AMITY HALL,
     3             PAVEMENT RESTORATION, BRIDGE
     4             REHABILITATION AND SAFETY IMPROVEMENTS        550,000
     5             (BASE PROJECT ALLOCATION - $500,000)
     6             (DESIGN AND CONTINGENCIES - $50,000)
     7         (B)  S.R.0011, RESURFACE ROADWAY BETWEEN
     8             S.R.0081 AND PERDIX                         1,880,000
     9             (BASE PROJECT ALLOCATION - $1,850,000)
    10             (DESIGN AND CONTINGENCIES - $30,000)
    11     (II)  S.R.0022
    12         (A)  U.S.22, SOUTH OF NEWPORT TO DAUPHIN
    13             COUNTY LINE, RESTORATION                    2,001,000
    14             (BASE PROJECT ALLOCATION - $1,701,000)
    15             (DESIGN AND CONTINGENCIES - $300,000)
    16     (III)  DUNCANNON BOROUGH
    17         (A)  DUNCANNON BOROUGH, REBUILD SUBWAY TO
    18             CORRECT DRAINAGE PROBLEM                    2,750,000
    19             (BASE PROJECT ALLOCATION - $2,000,000)
    20             (LAND ALLOCATION - $400,000)
    21             (DESIGN AND CONTINGENCIES - $350,000)
    22  (51)  PHILADELPHIA COUNTY
    23     (I)  S.R.0076
    24         (A)  INCIDENT MANAGEMENT ON I-76 WEST
    25             BETWEEN I-676 WEST AND CITY AVENUE
    26             INTERCHANGE, CITY OF PHILADELPHIA             800,000
    27             (BASE PROJECT ALLOCATION - $710,000)
    28             (LAND ALLOCATION - $10,000)
    29             (DESIGN AND CONTINGENCIES - $80,000)
    30         (B)  I-76 FROM WALT WHITMAN BRIDGE TO
    19990H1023B3629                 - 173 -

     1             MONTGOMERY COUNTY LINE, PAVEMENT
     2             RESTORATION, BRIDGE REHABILITATION AND
     3             SAFETY IMPROVEMENTS                           850,000
     4             (BASE PROJECT ALLOCATION - $800,000)
     5             (DESIGN AND CONTINGENCIES - $50,000)
     6     (II)  S.R.0001
     7         (A)  U.S.1 FROM HUNTING PARK TO I-76,
     8             PAVEMENT RESTORATION, BRIDGE
     9             REHABILITATION AND SAFETY IMPROVEMENTS        350,000
    10             (BASE PROJECT ALLOCATION - $300,000)
    11             (DESIGN AND CONTINGENCIES - $50,000)
    12         (B)  U.S.1, TWIN BRIDGE TO NINTH STREET,
    13             CITY OF PHILADELPHIA, RESTORATION           5,400,000
    14             (BASE PROJECT ALLOCATION - $5,000,000)
    15             (LAND ALLOCATION - $40,000)
    16             (DESIGN AND CONTINGENCIES - $360,000)
    17     (III)  S.R.0095
    18         (A)  I-95 FROM DELAWARE STATE LINE TO NEW
    19             JERSEY STATE LINE, PAVEMENT
    20             RESTORATION, BRIDGE REHABILITATION AND
    21             SAFETY IMPROVEMENTS                         2,250,000
    22             (BASE PROJECT ALLOCATION - $2,200,000)
    23             (DESIGN AND CONTINGENCIES - $50,000)
    24     (IV)  S.R.0676
    25         (A)  I-676 FROM I-95 TO I-76, PAVEMENT
    26             RESTORATION, BRIDGE REHABILITATION AND
    27             SAFETY IMPROVEMENTS                           250,000
    28             (BASE PROJECT ALLOCATION - $200,000)
    29             (DESIGN AND CONTINGENCIES - $50,000)
    30     (V)  S.R.0063
    19990H1023B3629                 - 174 -

     1         (A)  S.R.0063 FROM NEW JERSEY STATE LINE TO
     2             U.S.1 JUNCTION, PAVEMENT RESTORATION,
     3             BRIDGE REHABILITATION AND SAFETY
     4             IMPROVEMENTS                                  350,000
     5             (BASE PROJECT ALLOCATION - $300,000)
     6             (DESIGN AND CONTINGENCIES - $50,000)
     7     (VI)  INTELLIGENT TRANSPORTATION SYSTEMS
     8         (A)  CONSTRUCT INTELLIGENT TRANSPORTATION
     9             SYSTEMS THROUGHOUT THE PHILADELPHIA
    10             AREA                                          500,000
    11             (BASE PROJECT ALLOCATION - $500,000)
    12     (VII)  S.R.3007
    13         (A)  S.R.3007, ART MUSEUM TO GUSTINE LAKE,
    14             CITY OF PHILADELPHIA, LIGHTING AND
    15             SAFETY IMPROVEMENTS                           265,000
    16             (BASE PROJECT ALLOCATION - $240,000)
    17             (DESIGN AND CONTINGENCIES - $25,000)
    18     (VIII)  S.R.4007
    19         (A)  S.R.4007, ALLENS LANE TO CRESHEIM
    20             VALLEY DRIVE, CITY OF PHILADELPHIA,
    21             RECONSTRUCTION                                880,000
    22             (BASE PROJECT ALLOCATION - $800,000)
    23             (DESIGN AND CONTINGENCIES - $80,000)
    24  (52)  PIKE COUNTY
    25     (I)  S.R.0084
    26         (A)  I-84 FROM NEW JERSEY STATE LINE TO
    27             WAYNE COUNTY LINE, PAVEMENT
    28             RESTORATION, BRIDGE REHABILITATION AND
    29             SAFETY IMPROVEMENTS                         3,550,000
    30             (BASE PROJECT ALLOCATION - $3,500,000)
    19990H1023B3629                 - 175 -

     1             (DESIGN AND CONTINGENCIES - $50,000)
     2         (B)  WAYNE COUNTY TO DELAWARE RIVER,
     3             OVERHEAD SIGN STRUCTURES                       34,000
     4             (BASE PROJECT ALLOCATION - $34,000)
     5     (II)  S.R.1001
     6         (A)  WELL ROAD RELOCATION, BLOOMING GROVE
     7             TOWNSHIP, RELOCATION                          395,000
     8             (BASE PROJECT ALLOCATION - $300,000)
     9             (LAND ALLOCATION - $20,000)
    10             (DESIGN AND CONTINGENCIES - $75,000)
    11     (III)  PA 590
    12         (A)  PALMYRA TOWNSHIP, SAFETY IMPROVEMENT         100,000
    13             (BASE PROJECT ALLOCATION - $80,000)
    14             (DESIGN AND CONTINGENCIES - $20,000)
    15     (IV)  PA 739
    16         (A)  DELAWARE TOWNSHIP, ROADWAY
    17             IMPROVEMENTS                                  130,000
    18             (BASE PROJECT ALLOCATION - $100,000)
    19             (DESIGN AND CONTINGENCIES - $30,000)
    20     (V)  U.S.6
    21         (A)  MILFORD AND MATAMORAS BOROUGHS,
    22             MILFORD AND WESTFALL TOWNSHIPS, ROADWAY
    23             IMPROVEMENTS                                  450,000
    24             (BASE PROJECT ALLOCATION - $400,000)
    25             (LAND ALLOCATION - $10,000)
    26             (DESIGN AND CONTINGENCIES - $40,000)
    27  (53)  POTTER COUNTY
    28     (I)  PA 449
    29         (A)  PA 449 FROM U.S.6 TO NEW YORK STATE
    30             LINE, ALLEGANY, GENESEE AND ULYSSES
    19990H1023B3629                 - 176 -

     1             TOWNSHIPS, RESTORATION                        830,000
     2             (BASE PROJECT ALLOCATION - $750,000)
     3             (LAND ALLOCATION - $20,000)
     4             (DESIGN AND CONTINGENCIES - $60,000)
     5  (54)  SCHUYLKILL COUNTY
     6     (I)  S.R.0061
     7         (A)  WIDEN AND SAFETY IMPROVEMENTS ON
     8             S.R.0061 FROM DEER LAKE SOUTH               4,786,000
     9             (BASE PROJECT ALLOCATION - $2,800,000)
    10             (LAND ALLOCATION - $1,500,000)
    11             (DESIGN AND CONTINGENCIES - $486,000)
    12         (B)  BERKS COUNTY LINE TO COLUMBIA COUNTY
    13             LINE, VARIOUS MUNICIPALITIES,
    14             RESTORATION, WIDENING AND SAFETY
    15             IMPROVEMENTS                               70,938,000
    16             (BASE PROJECT ALLOCATION - $56,402,000)
    17             (LAND ALLOCATION - $4,848,000)
    18             (DESIGN AND CONTINGENCIES - $9,688,000)
    19     (II)  S.R.0081
    20         (A)  I-81 FROM LEBANON COUNTY LINE TO
    21             LUZERNE COUNTY LINE, PAVEMENT
    22             RESTORATION, BRIDGE REHABILITATION AND
    23             SAFETY IMPROVEMENTS                         4,350,000
    24             (BASE PROJECT ALLOCATION - $4,300,000)
    25             (DESIGN AND CONTINGENCIES - $50,000)
    26         (B)  FROM EXIT 32 TO EXIT 34, TREMONT AND
    27             FRAILEY TOWNSHIPS, CONSTRUCT NORTHBOUND
    28             CLIMBING LANE                                 810,000
    29             (BASE PROJECT ALLOCATION - $800,000)
    30             (DESIGN AND CONTINGENCIES - $10,000)
    19990H1023B3629                 - 177 -

     1     (III)  U.S.209
     2         (A)  FROM PA 901 TO PA 61, PINE GROVE,
     3             WASHINGTON, WAYNE AND NORTH MANHEIM
     4             TOWNSHIPS, SAFETY AND CONGESTION
     5             IMPROVEMENTS                                  700,000
     6             (BASE PROJECT ALLOCATION - $400,000)
     7             (LAND ALLOCATION - $200,000)
     8             (DESIGN AND CONTINGENCIES - $100,000)
     9         (B)  FROM PA 61 TO MIDDLEPORT BOROUGH LINE,
    10             POTTSVILLE CITY, PORT CARBON AND PALO
    11             ALTO BOROUGHS, NEW ROADWAY                  2,500,000
    12             (BASE PROJECT ALLOCATION - $1,800,000)
    13             (LAND ALLOCATION - $300,000)
    14             (DESIGN AND CONTINGENCIES - $400,000)
    15         (C)  INTERSECTION WITH S.R.0309, TAMAQUA
    16             BOROUGH, INTERSECTION IMPROVEMENTS          1,460,000
    17             (BASE PROJECT ALLOCATION - $1,200,000)
    18             (LAND ALLOCATION - $160,000)
    19             (DESIGN AND CONTINGENCIES - $100,000)
    20         (D)  S.R.0081 TO S.R.0125, TREMONT BOROUGH
    21             AND TREMONT TOWNSHIP, WIDEN, DRAINAGE
    22             AND RESURFACE                                 920,000
    23             (BASE PROJECT ALLOCATION - $800,000)
    24             (LAND ALLOCATION - $20,000)
    25             (DESIGN AND CONTINGENCIES - $100,000)
    26     (IV)  PA 443
    27         (A)  FROM PA 125 TO PA 183, PINE GROVE,
    28             WASHINGTON AND WAYNE TOWNSHIPS,
    29             RESTORATION AND WIDENING                      128,000
    30             (BASE PROJECT ALLOCATION - $120,000)
    19990H1023B3629                 - 178 -

     1             (DESIGN AND CONTINGENCIES - $8,000)
     2         (B)  INTERSECTION WITH PA 183, WAYNE
     3             TOWNSHIP, INTERSECTION IMPROVEMENTS           164,000
     4             (BASE PROJECT ALLOCATION - $160,000)
     5             (DESIGN AND CONTINGENCIES - $4,000)
     6     (V)  PA 54
     7         (A)  FROM U.S.309 TO PA 61, RUSH TOWNSHIP,
     8             RESTORATION AND WIDENING                    1,430,000
     9             (BASE PROJECT ALLOCATION - $1,120,000)
    10             (LAND ALLOCATION - $10,000)
    11             (DESIGN AND CONTINGENCIES - $300,000)
    12         (B)  T-873 TO T-853, MAHANOY CITY BOROUGH,
    13             MILL AND RESURFACE                             96,000
    14             (BASE PROJECT ALLOCATION - $90,000)
    15             (DESIGN AND CONTINGENCIES - $6,000)
    16     (VI)  S.R.3002
    17         (A)  FROM PA 183 TO PA 125, PINE GROVE,
    18             WASHINGTON, WAYNE AND NORTH MANHEIM
    19             TOWNSHIPS, RESTORATION AND WIDENING           310,000
    20             (BASE PROJECT ALLOCATION - $240,000)
    21             (LAND ALLOCATION - $10,000)
    22             (DESIGN AND CONTINGENCIES - $60,000)
    23     (VII)  S.R.1008
    24         (A)  S.R.0061 TO EXIT 37 OF I-81,
    25             FRACKVILLE BOROUGH, WEST MAHANOY AND
    26             MAHANOY TOWNSHIPS, WIDEN TO 4 LANES,
    27             DRAINAGE IMPROVEMENTS, RESURFACE            1,820,000
    28             (BASE PROJECT ALLOCATION - $1,600,000)
    29             (LAND ALLOCATION - $200,000)
    30             (DESIGN AND CONTINGENCIES - $20,000)
    19990H1023B3629                 - 179 -

     1     (VIII)  S.R.0025
     2         (A)  INTERSECTION WITH S.R.0125, HEGINS
     3             TOWNSHIP, INTERSECTION IMPROVEMENT            140,000
     4             (BASE PROJECT ALLOCATION - $70,000)
     5             (LAND ALLOCATION - $40,000)
     6             (DESIGN AND CONTINGENCIES - $30,000)
     7     (IX)  S.R.4002
     8         (A)  S.R.0901 TO T-861, FOSTER AND CASS
     9             TOWNSHIPS, STORM DRAINAGE IMPROVEMENTS        174,000
    10             (BASE PROJECT ALLOCATION - $150,000)
    11             (DESIGN AND CONTINGENCIES - $24,000)
    12     (X)  S.R.4013
    13         (A)  S.R.0025 TO S.R.4011, HEGINS AND
    14             HUBLEY TOWNSHIPS, REALIGN, WIDEN AND
    15             RESURFACE                                     296,000
    16             (BASE PROJECT ALLOCATION - $240,000)
    17             (LAND ALLOCATION - $16,000)
    18             (DESIGN AND CONTINGENCIES - $40,000)
    19     (XI)  S.R.0025
    20         (A)  S.R.4013 TO S.R.0081, HEGINS AND
    21             HUBLEY TOWNSHIPS, WIDEN AND RESURFACE       1,400,000
    22             (BASE PROJECT ALLOCATION - $1,200,000)
    23             (LAND ALLOCATION - $80,000)
    24             (DESIGN AND CONTINGENCIES - $120,000)
    25     (XII)  S.R.4011
    26         (A)  S.R.4013 TO S.R.0209, HEGINS AND
    27             TREMONT TOWNSHIPS, REALIGN, WIDEN AND
    28             RESURFACE                                     920,000
    29             (BASE PROJECT ALLOCATION - $800,000)
    30             (LAND ALLOCATION - $40,000)
    19990H1023B3629                 - 180 -

     1             (DESIGN AND CONTINGENCIES - $80,000)
     2     (XIII)  S.R.0924
     3         (A)  GILBERTON BOROUGH, ELIMINATION OF ROCK
     4             FALL                                          890,000
     5             (BASE PROJECT ALLOCATION - $800,000)
     6             (LAND ALLOCATION - $40,000)
     7             (DESIGN AND CONTINGENCIES - $50,000)
     8     (XIV)  S.R.4007
     9         (A)  S.R.4002 TO S.R.4006, CASS AND BUTLER
    10             TOWNSHIPS, GORDON BOROUGH, WIDEN,
    11             DRAINAGE, RESURFACE                           796,000
    12             (BASE PROJECT ALLOCATION - $720,000)
    13             (LAND ALLOCATION - $6,000)
    14             (DESIGN AND CONTINGENCIES - $70,000)
    15     (XV)  S.R.1006
    16         (A)  ST. CLAIR BOROUGH TO S.R.1008, RYAN,
    17             BLYTHE AND EAST NORWEGIAN TOWNSHIPS,
    18             WIDENING, SHOULDER IMPROVEMENTS AND
    19             RESURFACING                                   460,000
    20             (BASE PROJECT ALLOCATION - $400,000)
    21             (LAND ALLOCATION - $20,000)
    22             (DESIGN AND CONTINGENCIES - $40,000)
    23     (XVI)  S.R.0901
    24         (A)  S.R.0081 TO S.R.4002, FOSTER AND CASS
    25             TOWNSHIPS AND MINERSVILLE BOROUGH,
    26             WIDEN, CONSTRUCT CLIMBING LANE,
    27             DRAINAGE AND RESURFACE                      1,020,000
    28             (BASE PROJECT ALLOCATION - $800,000)
    29             (LAND ALLOCATION - $60,000)
    30             (DESIGN AND CONTINGENCIES - $160,000)
    19990H1023B3629                 - 181 -

     1     (XVII)  S.R.0000
     2         (A)  FROM PINE CREEK TO ORCHARD ROAD, RUSH
     3             TOWNSHIP, STABILIZE STREAM EMBANKMENT         408,000
     4             (BASE PROJECT ALLOCATION - $8,000)
     5             (DESIGN AND CONTINGENCIES - $400,000)
     6     (XVIII)  S.R.0000
     7         (A)  FROM BERKS COUNTY LINE TO I-81 VARIOUS
     8             MUNICIPALITIES, NEW ROADWAY                92,000,000
     9             (BASE PROJECT ALLOCATION - $80,000,000)
    10             (LAND ALLOCATION - $10,000,000)
    11             (DESIGN AND CONTINGENCIES - $2,000,000)
    12  (55)  SOMERSET COUNTY
    13     (I)  S.R.0219
    14         (A)  RESURFACE S.R.0219 FROM S.R.0281
    15             INTERCHANGE TO END OF EXPRESSWAY,
    16             SOMERSET TOWNSHIP                           5,480,000
    17             (BASE PROJECT ALLOCATION - $5,280,000)
    18             (DESIGN AND CONTINGENCIES - $200,000)
    19         (B)  U.S.219 FROM SOMERSET TO CAMBRIA
    20             COUNTY LINE, PAVEMENT RESTORATION,
    21             BRIDGE REHABILITATION AND SAFETY
    22             IMPROVEMENTS                                2,450,000
    23             (BASE PROJECT ALLOCATION - $2,400,000)
    24             (DESIGN AND CONTINGENCIES - $50,000)
    25     (II)  PA 601
    26         (A)  NORTH CENTER AVENUE, SOMERSET
    27             TOWNSHIP, TRAFFIC SIGNALS, SAFETY
    28             IMPROVEMENT/TURN LANE                          90,000
    29             (BASE PROJECT ALLOCATION - $83,000)
    30             (LAND ALLOCATION - $1,000)
    19990H1023B3629                 - 182 -

     1             (DESIGN AND CONTINGENCIES - $6,000)
     2     (III)  PA 31
     3         (A)  INTERSECTION OF PA 31 AND PLEASANT
     4             HILL ROAD (T-546), SOMERSET TOWNSHIP,
     5             SAFETY IMPROVEMENT                             79,000
     6             (BASE PROJECT ALLOCATION - $50,000)
     7             (LAND ALLOCATION - $15,000)
     8             (DESIGN AND CONTINGENCIES - $14,000)
     9     (IV)  PA 281
    10         (A)  INTERSECTION OF PA 281 AND SECHLER
    11             ROAD, SOMERSET BOROUGH, SAFETY
    12             IMPROVEMENT                                    79,000
    13             (BASE PROJECT ALLOCATION - $50,000)
    14             (LAND ALLOCATION - $15,000)
    15             (DESIGN AND CONTINGENCIES - $14,000)
    16         (B)  INTERSECTION OF PA 281 AND SECHLER
    17             ROAD, SOMERSET BOROUGH, SAFETY
    18             IMPROVEMENT                                    24,000
    19             (BASE PROJECT ALLOCATION - $20,000)
    20             (LAND ALLOCATION - $1,000)
    21             (DESIGN AND CONTINGENCIES - $3,000)
    22     (V)  S.R.3041
    23         (A)  INTERSECTION OF S.R.3041 AND
    24             INDUSTRIAL PARK ROAD (T-522), SOMERSET
    25             TOWNSHIP, SAFETY IMPROVEMENT                  105,000
    26             (BASE PROJECT ALLOCATION - $70,000)
    27             (LAND ALLOCATION - $20,000)
    28             (DESIGN AND CONTINGENCIES - $15,000)
    29     (VI)  PA 160
    30         (A)  WELLERSBURG, SOUTHAMPTON TOWNSHIP,
    19990H1023B3629                 - 183 -

     1             CONSTRUCT TRUCK RAMP                          780,000
     2             (BASE PROJECT ALLOCATION - $400,000)
     3             (LAND ALLOCATION - $80,000)
     4             (DESIGN AND CONTINGENCIES - $300,000)
     5  (56)  SULLIVAN COUNTY
     6     (I)  U.S.220
     7         (A)  U.S.220 FROM CHRISTIAN STREET TO
     8             RAILROAD STREET, RESURFACE                    174,000
     9             (BASE PROJECT ALLOCATION - $94,000)
    10             (LAND ALLOCATION - $10,000)
    11             (DESIGN AND CONTINGENCIES - $70,000)
    12     (II)  PA 87
    13         (A)  PA 87 OVER STONEY RUN, HILLSGROVE
    14             TOWNSHIP, BRIDGE REPLACEMENT                   86,000
    15             (BASE PROJECT ALLOCATION - $60,000)
    16             (LAND ALLOCATION - $6,000)
    17             (DESIGN AND CONTINGENCIES - $20,000)
    18  (57)  SUSQUEHANNA COUNTY
    19     (I)  S.R.0081
    20         (A)  I-81 FROM LENOX TO HARFORD, TOWNSHIPS,
    21             RESURFACE                                   2,150,000
    22             (BASE PROJECT ALLOCATION - $2,100,000)
    23             (DESIGN AND CONTINGENCIES - $50,000)
    24         (B)  I-81 FROM HARFORD TOWNSHIP TO NEW
    25             MILFORD BOROUGH, RESURFACE                    300,000
    26             (BASE PROJECT ALLOCATION - $290,000)
    27             (DESIGN AND CONTINGENCIES - $10,000)
    28         (C)  I-81, LACKAWANNA COUNTY TO NEW YORK
    29             STATE LINE, OVERHEAD SIGN STRUCTURES           35,000
    30             (BASE PROJECT ALLOCATION - $35,000)
    19990H1023B3629                 - 184 -

     1     (II)  S.R.0706
     2         (A)  BRADFORD TO U.S.11, STUDY AND
     3             RECONSTRUCTION                              3,200,000
     4             (BASE PROJECT ALLOCATION - $2,000,000)
     5             (LAND ALLOCATION - $200,000)
     6             (DESIGN AND CONTINGENCIES - $1,000,000)
     7  (58)  TIOGA COUNTY
     8     (I)  S.R.0015
     9         (A)  U.S.15 FROM LYCOMING COUNTY LINE TO
    10             S.R.2005, PAVEMENT RESTORATION, BRIDGE
    11             REHABILITATION AND SAFETY IMPROVEMENTS        650,000
    12             (BASE PROJECT ALLOCATION - $600,000)
    13             (DESIGN AND CONTINGENCIES - $50,000)
    14         (B)  U.S.15 FROM CANOE CAMP TO PA 287,
    15             PAVEMENT RESTORATION, BRIDGE
    16             REHABILITATION AND SAFETY IMPROVEMENTS      1,150,000
    17             (BASE PROJECT ALLOCATION - $1,100,000)
    18             (DESIGN AND CONTINGENCIES - $50,000)
    19     (II)  PA 49
    20         (A)  PA 49 FROM T-763 TO LAWRENCEVILLE
    21             BOROUGH, RESTORATION                          426,000
    22             (BASE PROJECT ALLOCATION - $406,000)
    23             (DESIGN AND CONTINGENCIES - $20,000)
    24  (59)  UNION COUNTY
    25     (I)  S.R.0080
    26         (A)  I-80 FROM NORTHUMBERLAND COUNTY LINE
    27             TO CLINTON COUNTY LINE, PAVEMENT
    28             RESTORATION, BRIDGE REHABILITATION AND
    29             SAFETY IMPROVEMENTS                         1,650,000
    30             (BASE PROJECT ALLOCATION - $1,600,000)
    19990H1023B3629                 - 185 -

     1             (DESIGN AND CONTINGENCIES - $50,000)
     2     (II)  S.R.0015
     3         (A)  U.S.15 FROM LINNTOWN TO ALLENWOOD,
     4             PAVEMENT RESTORATION, BRIDGE
     5             REHABILITATION AND SAFETY IMPROVEMENTS      1,050,000
     6             (BASE PROJECT ALLOCATION - $1,000,000)
     7             (DESIGN AND CONTINGENCIES - $50,000)
     8         (B)  LYCOMING/UNION COUNTY LINE TO PA 44,
     9             ALLENWOOD, RECONSTRUCTION, SAFETY
    10             IMPROVEMENTS                                6,000,000
    11             (BASE PROJECT ALLOCATION - $5,000,000)
    12             (LAND ALLOCATION - $500,000)
    13             (DESIGN AND CONTINGENCIES - $500,000)
    14         (C)  EAST BUFFALO/UNION TOWNSHIP LINE TO
    15             SOUTH OF THE VILLAGE OF WINFIELD,
    16             SANDEL ROAD T-333                           2,700,000
    17             (BASE PROJECT ALLOCATION - $2,500,000)
    18             (LAND ALLOCATION - $100,000)
    19             (DESIGN AND CONTINGENCIES - $100,000)
    20     (III)  S.R.0045
    21         (A)  LEWISBURG S.R.0015 TO MIFFLINBURG
    22             S.R.3007 CORRIDOR STUDY, SAFETY
    23             IMPROVEMENTS                                5,300,000
    24             (BASE PROJECT ALLOCATION - $5,000,000)
    25             (LAND ALLOCATION - $100,000)
    26             (DESIGN AND CONTINGENCIES - $200,000)
    27  (60)  VENANGO COUNTY
    28     (I)  S.R.0322
    29         (A)  U.S.322 FROM HORSE CREEK ROAD TO
    30             MAPLESHADE, CRANBERRY TOWNSHIP,
    19990H1023B3629                 - 186 -

     1             RECONSTRUCTION                                463,000
     2             (BASE PROJECT ALLOCATION - $403,000)
     3             (LAND ALLOCATION - $20,000)
     4             (DESIGN AND CONTINGENCIES - $40,000)
     5         (B)  IMPROVEMENTS AT INTERSECTION OF
     6             U.S.322, PA 357 AND S.R.2013                  261,000
     7             (BASE PROJECT ALLOCATION - $201,000)
     8             (DESIGN AND CONTINGENCIES - $60,000)
     9     (II)  S.R.0008
    10         (A)  S.R.0008 FROM WESLEY S.R.3003 TO
    11             S.R.3013, PAVEMENT RESTORATION, BRIDGE
    12             REHABILITATION AND SAFETY IMPROVEMENTS      1,150,000
    13             (BASE PROJECT ALLOCATION - $1,100,000)
    14             (DESIGN AND CONTINGENCIES - $50,000)
    15     (III)  S.R.0080
    16         (A)  I-80 FROM CLARION COUNTY LINE TO
    17             MERCER COUNTY LINE, PAVEMENT
    18             RESTORATION, BRIDGE REHABILITATION AND
    19             SAFETY IMPROVEMENTS                         1,550,000
    20             (BASE PROJECT ALLOCATION - $1,500,000)
    21             (DESIGN AND CONTINGENCIES - $50,000)
    22     (IV)  PA 38
    23         (A)  PA 38, TOP OF EMLENTON HILL,
    24             SCRUBGRASS TOWNSHIP, TRUCK PULL-OFF
    25             LANE                                        1,000,000
    26             (BASE PROJECT ALLOCATION - $800,000)
    27             (LAND ALLOCATION - $100,000)
    28             (DESIGN AND CONTINGENCIES - $100,000)
    29     (V)  PA 417
    30         (A)  INTERSECTION OF SUGARCREEK BOROUGH
    19990H1023B3629                 - 187 -

     1             ROAD AND OLD WARREN ROAD, SUGARCREEK
     2             BOROUGH, SAFETY IMPROVEMENT                   250,000
     3             (BASE PROJECT ALLOCATION - $200,000)
     4             (LAND ALLOCATION - $10,000)
     5             (DESIGN AND CONTINGENCIES - $40,000)
     6  (61)  WARREN COUNTY
     7     (I)  S.R.6006
     8         (A)  IMPROVEMENT TO INTERSECTION AT T.R. 6B
     9             AND S.R.1013                                  100,000
    10             (BASE PROJECT ALLOCATION - $70,000)
    11             (LAND ALLOCATION - $20,000)
    12             (DESIGN AND CONTINGENCIES - $10,000)
    13     (II)  S.R.0006
    14         (A)  U.S.6 FROM SOUTH WARREN S.R.2003 TO
    15             U.S.6 BUSINESS, PAVEMENT RESTORATION,
    16             BRIDGE REHABILITATION AND SAFETY
    17             IMPROVEMENTS                                  250,000
    18             (BASE PROJECT ALLOCATION - $200,000)
    19             (DESIGN AND CONTINGENCIES - $50,000)
    20     (III)  S.R.0069
    21         (A)  WIDEN AND RESURFACE S.R.0069 FROM
    22             S.R.0062 TO NEW YORK STATE LINE             6,000,000
    23             (BASE PROJECT ALLOCATION - $5,250,000)
    24             (DESIGN AND CONTINGENCIES - $750,000)
    25     (IV)  PENNSYLVANIA AVENUE
    26         (A)  INTERSECTION OF PENNSYLVANIA AVENUE
    27             AND PARK AVENUE, INTERSECTION
    28             IMPROVEMENT                                   100,000
    29             (BASE PROJECT ALLOCATION - $70,000)
    30             (LAND ALLOCATION - $20,000)
    19990H1023B3629                 - 188 -

     1             (DESIGN AND CONTINGENCIES - $10,000)
     2  (62)  WASHINGTON COUNTY
     3     (I)  S.R.0019
     4         (A)  IMPROVE INTERCHANGE WITH S.R.1010,
     5             VALLEY BROOK ROAD                             500,000
     6         (B)  IMPROVE INTERSECTION AND APPROACHES TO
     7             S.R.1002                                    1,500,000
     8         (C)  U.S.19 AT MEADOWBROOK DRIVE, NORTH
     9             STRABANE TOWNSHIP, SAFETY
    10             IMPROVEMENT/TURNING LANE                      181,000
    11             (BASE PROJECT ALLOCATION - $147,000)
    12             (LAND ALLOCATION - $12,000)
    13             (DESIGN AND CONTINGENCIES - $22,000)
    14         (D)  U.S.19, GATESHEAD TO HIDDEN VALLEY
    15             ROAD, RESTORATION                             102,000
    16             (BASE PROJECT ALLOCATION - $68,000)
    17             (LAND ALLOCATION - $24,000)
    18             (DESIGN AND CONTINGENCIES - $10,000)
    19     (II)  S.R.0070
    20         (A)  IMPROVE INTERCHANGE RAMPS ON WESTERN
    21             SIDE OF S.R.2037, FALLOWFIELD TOWNSHIP      1,000,000
    22             (BASE PROJECT ALLOCATION - $800,000)
    23             (LAND ALLOCATION - $100,000)
    24             (DESIGN AND CONTINGENCIES - $100,000)
    25         (B)  IMPROVE AIRPORT INTERCHANGE FROM
    26             BUFFALO TOWNSHIP TO S.R.0040                2,600,000
    27             (BASE PROJECT ALLOCATION - $2,000,000)
    28             (LAND ALLOCATION - $300,000)
    29             (DESIGN AND CONTINGENCIES - $300,000)
    30         (C)  I-70 FROM WESTMORELAND COUNTY LINE TO
    19990H1023B3629                 - 189 -

     1             WEST VIRGINIA STATE LINE, PAVEMENT
     2             RESTORATION, BRIDGE REHABILITATION AND
     3             SAFETY IMPROVEMENTS                         4,150,000
     4             (BASE PROJECT ALLOCATION - $4,100,000)
     5             (DESIGN AND CONTINGENCIES - $50,000)
     6         (D)  I-70/PA 88 INTERSECTION, CHARLEROI
     7             BOROUGH, SAFETY IMPROVEMENT                   540,000
     8             (BASE PROJECT ALLOCATION - $400,000)
     9             (LAND ALLOCATION - $100,000)
    10             (DESIGN AND CONTINGENCIES - $40,000)
    11         (E)  I-70, EXIT 3 TO EXIT 4, RESTORATION          800,000
    12             (BASE PROJECT ALLOCATION - $760,000)
    13             (DESIGN AND CONTINGENCIES - $40,000)
    14         (F)  I-70, LOWER INTERCHANGE RAMPS, WEST
    15             SIDE OF S.R.2037, FALLOWFIELD TOWNSHIP,
    16             RECONSTRUCTION                                600,000
    17             (BASE PROJECT ALLOCATION - $400,000)
    18             (LAND ALLOCATION - $100,000)
    19             (DESIGN AND CONTINGENCIES - $100,000)
    20     (III)  S.R.0079
    21         (A)  I-79 FROM GREENE COUNTY LINE TO
    22             ALLEGHENY COUNTY LINE, PAVEMENT
    23             RESTORATION, BRIDGE REHABILITATION AND
    24             SAFETY IMPROVEMENTS                         2,450,000
    25             (BASE PROJECT ALLOCATION - $2,400,000)
    26             (DESIGN AND CONTINGENCIES - $50,000)
    27     (IV)  S.R.0088
    28         (A)  IMPROVE TURNING RADIUS AT INTERSECTION
    29             WITH S.R.1006, FINLEYVILLE                    360,000
    30             (BASE PROJECT ALLOCATION - $60,000)
    19990H1023B3629                 - 190 -

     1             (LAND ALLOCATION - $200,000)
     2             (DESIGN AND CONTINGENCIES - $100,000)
     3         (B)  INTERSECTION OF PA 88 AND PA 837, NEW
     4             EAGLE BOROUGH, SAFETY IMPROVEMENT             120,000
     5             (BASE PROJECT ALLOCATION - $100,000)
     6             (LAND ALLOCATION - $10,000)
     7             (DESIGN AND CONTINGENCIES - $10,000)
     8         (C)  PA 88, FROM PA 481 TO PA 136, CITY OF
     9             MONONGAHELA, SAFETY IMPROVEMENTS               56,000
    10             (BASE PROJECT ALLOCATION - $40,000)
    11             (LAND ALLOCATION - $6,000)
    12             (DESIGN AND CONTINGENCIES - $10,000)
    13     (V)  S.R.4049, S.R.1083 AND S.R.0018
    14         (A)  MAIN STREET FROM WALNUT STREET TO
    15             RAILROAD TRACKS AND MAIDEN STREET FROM
    16             FRANKLIN STREET TO COLLEGE STREET,
    17             RECONSTRUCTION                                760,000
    18             (BASE PROJECT ALLOCATION - $760,000)
    19     (VI)  PA 18
    20         (A)  PA 18/MARKET STREET INTERSECTION,
    21             BURGETTSTOWN, INTERSECTION IMPROVEMENT        140,000
    22             (BASE PROJECT ALLOCATION - $30,000)
    23             (LAND ALLOCATION - $50,000)
    24             (DESIGN AND CONTINGENCIES - $60,000)
    25         (B)  INTERSECTION OF PA 18 AND S.R.4008,
    26             BURGETTSTOWN BOROUGH, SAFETY
    27             IMPROVEMENT                                   140,000
    28             (BASE PROJECT ALLOCATION - $60,000)
    29             (LAND ALLOCATION - $50,000)
    30             (DESIGN AND CONTINGENCIES - $30,000)
    19990H1023B3629                 - 191 -

     1     (VII)  PA 519
     2         (A)  INTERSECTIONS WITH PA 980 AND U.S.19
     3             SOUTHBOUND RAMPS, NORTH STRABANE
     4             TOWNSHIP, SIGNAL IMPROVEMENTS                  80,000
     5             (BASE PROJECT ALLOCATION - $40,000)
     6             (LAND ALLOCATION - $20,000)
     7             (DESIGN AND CONTINGENCIES - $20,000)
     8     (VIII)  S.R.1006
     9         (A)  INTERSECTION OF S.R.1006 AND S.R.1053,
    10             SAFETY IMPROVEMENT                            100,000
    11             (BASE PROJECT ALLOCATION - $70,000)
    12             (LAND ALLOCATION - $20,000)
    13             (DESIGN AND CONTINGENCIES - $10,000)
    14     (IX)  S.R.1010
    15         (A)  BEBOUT ROAD INTERSECTION, PETERS
    16             TOWNSHIP, SAFETY IMPROVEMENT/TURNING
    17             LANE                                           98,000
    18             (BASE PROJECT ALLOCATION - $88,000)
    19             (DESIGN AND CONTINGENCIES - $10,000)
    20     (X)  S.R.4049
    21         (A)  INTERSECTION TO HUMBERT LANE/COLONIAL
    22             DRIVE, SAFETY IMPROVEMENT                     170,000
    23             (BASE PROJECT ALLOCATION - $120,000)
    24             (LAND ALLOCATION - $30,000)
    25             (DESIGN AND CONTINGENCIES - $20,000)
    26     (XI)  COUNTYWIDE
    27         (A)  COUNTYWIDE, TRAFFIC SIGNAL
    28             IMPROVEMENTS                                  320,000
    29             (BASE PROJECT ALLOCATION - $260,000)
    30             (LAND ALLOCATION - $20,000)
    19990H1023B3629                 - 192 -

     1             (DESIGN AND CONTINGENCIES - $40,000)
     2  (63)  WAYNE COUNTY
     3     (I)  S.R.0084
     4         (A)  I-84 FROM PIKE COUNTY LINE TO
     5             LACKAWANNA COUNTY LINE, PAVEMENT
     6             RESTORATION, BRIDGE REHABILITATION AND
     7             SAFETY IMPROVEMENTS                           650,000
     8             (BASE PROJECT ALLOCATION - $600,000)
     9             (DESIGN AND CONTINGENCIES - $50,000)
    10     (II)  S.R.0380
    11         (A)  I-380 FROM NEW JERSEY STATE LINE TO
    12             LACKAWANNA COUNTY LINE, PAVEMENT
    13             RESTORATION, BRIDGE REHABILITATION AND
    14             SAFETY IMPROVEMENTS                           150,000
    15             (BASE PROJECT ALLOCATION - $100,000)
    16             (DESIGN AND CONTINGENCIES - $50,000)
    17     (III)  PA 296
    18         (A)  PRISON ACCESS, WAYMART, ROADWAY
    19             IMPROVEMENTS                                  440,000
    20             (BASE PROJECT ALLOCATION - $400,000)
    21             (LAND ALLOCATION - $20,000)
    22             (DESIGN AND CONTINGENCIES - $20,000)
    23  (64)  WESTMORELAND COUNTY
    24     (I)  S.R.0056
    25         (A)  IMPROVEMENTS FROM S.R.4048 TO
    26             INTERSECTION WITH T-792                       130,000
    27             (BASE PROJECT ALLOCATION - $80,000)
    28             (LAND ALLOCATION - $10,000)
    29             (DESIGN AND CONTINGENCIES - $40,000)
    30     (II)  S.R.0119
    19990H1023B3629                 - 193 -

     1         (A)  INTERMODAL INTERCHANGE ACCESS, EAST
     2             HUNTINGTON TOWNSHIP                         2,400,000
     3             (BASE PROJECT ALLOCATION - $2,000,000)
     4             (LAND ALLOCATION - $200,000)
     5             (DESIGN AND CONTINGENCIES - $200,000)
     6         (B)  U.S.119, TURNPIKE BRIDGE TO YOUNGWOOD,
     7             RESTORATION                                   520,000
     8             (BASE PROJECT ALLOCATION - $400,000)
     9             (LAND ALLOCATION - $40,000)
    10             (DESIGN AND CONTINGENCIES - $80,000)
    11     (III)  S.R.0130
    12         (A)  INTERSECTION IMPROVEMENTS FROM
    13             S.R.4002 TO TOLL 66, HEMPFIELD
    14             TOWNSHIP                                      260,000
    15             (BASE PROJECT ALLOCATION - $200,000)
    16             (LAND ALLOCATION - $20,000)
    17             (DESIGN AND CONTINGENCIES - $40,000)
    18         (B)  INTERSECTION OF PA 130 AND S.R.2013,
    19             SLATE RUN ROAD, HEMPFIELD TOWNSHIP,
    20             SAFETY IMPROVEMENT                             20,000
    21             (BASE PROJECT ALLOCATION - $16,000)
    22             (LAND ALLOCATION - $2,000)
    23             (DESIGN AND CONTINGENCIES - $2,000)
    24         (C)  INTERSECTION OF PA 130 AND PLEASANT
    25             VALLEY ROAD, PENN TOWNSHIP, SAFETY
    26             IMPROVEMENT AND ADD LANE                      122,000
    27             (BASE PROJECT ALLOCATION - $57,000)
    28             (LAND ALLOCATION - $25,000)
    29             (DESIGN AND CONTINGENCIES - $40,000)
    30     (IV)  S.R.0819
    19990H1023B3629                 - 194 -

     1         (A)  IMPROVEMENTS FROM T-744 TO T-395, EAST
     2             HUNTINGDON TOWNSHIP                         3,900,000
     3     (V)  S.R.3020
     4         (A)  RELOCATION OF S.R.3020, IMPROVEMENTS
     5             TO S.R.30, AND A NEW INTERSECTION WITH
     6             S.R.3020 AND S.R.30, NORTH HUNTINGDON
     7             TOWNSHIP                                    9,400,000
     8     (VI)  S.R.0070
     9         (A)  I-70 FROM I-76 TO WASHINGTON COUNTY
    10             LINE, PAVEMENT RESTORATION, BRIDGE
    11             REHABILITATION AND SAFETY IMPROVEMENTS      1,750,000
    12             (BASE PROJECT ALLOCATION - $1,700,000)
    13             (DESIGN AND CONTINGENCIES - $50,000)
    14         (B)  I-70, NEAR WASHINGTON COUNTY LINE,
    15             RESTORATION                                   420,000
    16             (BASE PROJECT ALLOCATION - $400,000)
    17             (DESIGN AND CONTINGENCIES - $20,000)
    18         (C)  I-70, NEW STANTON INTERCHANGE, NEW
    19             STANTON BOROUGH, RECONSTRUCTION             3,300,000
    20             (BASE PROJECT ALLOCATION - $3,000,000)
    21             (LAND ALLOCATION - $200,000)
    22             (DESIGN AND CONTINGENCIES - $100,000)
    23     (VII)  S.R.0422
    24         (A)  U.S.422, GREENSBURG BYPASS, PAVEMENT
    25             RESTORATION, BRIDGE REHABILITATION AND
    26             SAFETY IMPROVEMENTS                           450,000
    27             (BASE PROJECT ALLOCATION - $400,000)
    28             (DESIGN AND CONTINGENCIES - $50,000)
    29     (VIII)  S.R.0030
    30         (A)  WIDEN S.R.0030 FROM COLONY LANE TO
    19990H1023B3629                 - 195 -

     1             THOMPSON LANE, IMPROVE INTERSECTION
     2             WITH S.R.3020 AND RELOCATE S.R.3020,
     3             NORTH HUNTINGDON TOWNSHIP                  13,700,000
     4             (BASE PROJECT ALLOCATION - $9,800,000)
     5             (LAND ALLOCATION - $2,000,000)
     6             (DESIGN AND CONTINGENCIES - $1,900,000)
     7         (B)  U.S.30, FROM S.R.4019 TO MALTS LANE,
     8             SAFETY IMPROVEMENT AND ADD LANE               650,000
     9             (BASE PROJECT ALLOCATION - $500,000)
    10             (LAND ALLOCATION - $100,000)
    11             (DESIGN AND CONTINGENCIES - $50,000)
    12         (C)  U.S.30, ALLEGHENY COUNTY LINE TO
    13             S.R.4019, SAFETY IMPROVEMENT AND ADD
    14             LANE                                          560,000
    15             (BASE PROJECT ALLOCATION - $400,000)
    16             (LAND ALLOCATION - $100,000)
    17             (DESIGN AND CONTINGENCIES - $60,000)
    18         (D)  U.S.30, INTERSECTION OF U.S.30 AND PA
    19             981, UNITY TOWNSHIP, RECONSTRUCTION AND
    20             INTERSECTION IMPROVEMENT                      960,000
    21             (BASE PROJECT ALLOCATION - $600,000)
    22             (LAND ALLOCATION - $200,000)
    23             (DESIGN AND CONTINGENCIES - $160,000)
    24         (E)  U.S.30, IRWIN BRIDGE TO HAMILTON
    25             BUICK, SAFETY IMPROVEMENT AND ADD LANE        390,000
    26             (BASE PROJECT ALLOCATION - $300,000)
    27             (LAND ALLOCATION - $60,000)
    28             (DESIGN AND CONTINGENCIES - $30,000)
    29     (IX)  PA 31
    30         (A)  INTERSECTION OF PA 31 AT PA 981 AND
    19990H1023B3629                 - 196 -

     1             BRADDOCK AVENUE, MT. PLEASANT BOROUGH,
     2             SIGNAL IMPROVEMENTS AND ADD LANE              440,000
     3             (BASE PROJECT ALLOCATION - $400,000)
     4             (LAND ALLOCATION - $20,000)
     5             (DESIGN AND CONTINGENCIES - $20,000)
     6         (B)  INTERSECTION OF PA 31 AND PENNSYLVANIA
     7             TURNPIKE EXIT 9 DONEGAL, DONEGAL
     8             TOWNSHIP, SIGNAL IMPROVEMENTS AND
     9             TURNING LANES                                 107,000
    10             (BASE PROJECT ALLOCATION - $57,000)
    11             (LAND ALLOCATION - $10,000)
    12             (DESIGN AND CONTINGENCIES - $40,000)
    13     (X)  PA 66
    14         (A)  INTERSECTION OF PA 66 AND BEAVER RUN
    15             ROAD, WASHINGTON TOWNSHIP, SAFETY
    16             IMPROVEMENT AND ADD LANE                      230,000
    17             (BASE PROJECT ALLOCATION - $200,000)
    18             (LAND ALLOCATION - $20,000)
    19             (DESIGN AND CONTINGENCIES - $10,000)
    20     (XI)  PA 136
    21         (A)  INTERSECTION OF PA 136 AND U.S.30,
    22             GREENSBURG, SAFETY IMPROVEMENT                130,000
    23             (BASE PROJECT ALLOCATION - $100,000)
    24             (LAND ALLOCATION - $10,000)
    25             (DESIGN AND CONTINGENCIES - $20,000)
    26         (B)  SAFETY IMPROVEMENTS AND INTERSECTION
    27             UPGRADES FROM S.R.0030 TO S.R.3071,
    28             HEMPFIELD TOWNSHIP                          5,000,000
    29     (XII)  PA 981
    30         (A)  INTERSECTION OF PA 981 AND MONASTERY
    19990H1023B3629                 - 197 -

     1             DRIVE, SIGNAL IMPROVEMENTS AND ADD
     2             LANE                                          136,000
     3             (BASE PROJECT ALLOCATION - $120,000)
     4             (LAND ALLOCATION - $2,000)
     5             (DESIGN AND CONTINGENCIES - $14,000)
     6     (XIII)  S.R.1045
     7         (A)  ST. VINCENT COLLEGE, RELOCATION              720,000
     8             (BASE PROJECT ALLOCATION - $600,000)
     9             (DESIGN AND CONTINGENCIES - $120,000)
    10     (XIV)  COUNTYWIDE
    11         (A)  COUNTYWIDE, TRAFFIC SIGNAL
    12             IMPROVEMENT                                   530,000
    13             (BASE PROJECT ALLOCATION - $480,000)
    14             (LAND ALLOCATION - $20,000)
    15             (DESIGN AND CONTINGENCIES - $30,000)
    16     (XV)  BREWERY STREET, CITY OF GREENSBURG
    17         (A)  REPLACEMENT OF THE BREWERY STREET
    18             BRIDGE                                        925,000
    19             (BASE PROJECT ALLOCATION - $650,000)
    20             (LAND ALLOCATION - $25,000)
    21             (DESIGN AND CONTINGENCIES - $250,000)
    22     (XVI)  LAIRD STREET, CITY OF GREENSBURG
    23         (A)  REPLACEMENT OF THE LAIRD STREET
    24             BRIDGE                                        725,000
    25             (BASE PROJECT ALLOCATION - $500,000)
    26             (LAND ALLOCATION - $25,000)
    27             (DESIGN AND CONTINGENCIES - $200,000)
    28     (XVII)  ST. VINCENT GROVE ROAD, UNITY TOWNSHIP
    29         (A)  REPLACEMENT OF THE ST. VINCENT GROVE
    30             ROAD BRIDGE                                 1,590,000
    19990H1023B3629                 - 198 -

     1             (BASE PROJECT ALLOCATION - $1,200,000)
     2             (LAND ALLOCATION - $40,000)
     3             (DESIGN AND CONTINGENCIES - $350,000)
     4     (XVIII)  T.R.0937, DERRY TOWNSHIP
     5         (A)  REPLACEMENT OF THE T.R.0937 BRIDGE
     6             BETWEEN S.R.1025 AND S.R.1027                 725,000
     7             (BASE PROJECT ALLOCATION - $500,000)
     8             (LAND ALLOCATION - $25,000)
     9             (DESIGN AND CONTINGENCIES - $200,000)
    10     (XIX)  T.R.0941, DERRY TOWNSHIP
    11         (A)  REPLACEMENT OF THE T.R.0941 BRIDGE
    12             BETWEEN T.R.0968 AND S.R.1027                 725,000
    13             (BASE PROJECT ALLOCATION - $500,000)
    14             (LAND ALLOCATION - $25,000)
    15             (DESIGN AND CONTINGENCIES - $200,000)
    16  (65)  WYOMING COUNTY
    17     (I)  U.S.6
    18         (A)  REHABILITATION AND SAFETY IMPROVEMENTS
    19             FROM PA 87 TO T-455                         1,150,000
    20         (B)  REHABILITATION AND SAFETY IMPROVEMENTS
    21             FROM T-455 TO TUNKHANNOCK BYPASS            2,200,000
    22         (C)  FROM PA 92 TO EXISTING CONCRETE
    23             SECTION, TUNKHANNOCK TOWNSHIP,
    24             RESURFACING                                     8,000
    25             (BASE PROJECT ALLOCATION - $8,000)
    26     (II)  U.S.11
    27         (A)  REHABILITATION AND SAFETY IMPROVEMENTS
    28             FROM THE SUSQUEHANNA COUNTY LINE TO
    29             U.S.6                                       2,500,000
    30     (III)  S.R.1003
    19990H1023B3629                 - 199 -

     1         (A)  FROM S.R.1005 TO PA 29, LEMON AND
     2             TUNKHANNOCK TOWNSHIPS, RESURFACING              8,000
     3             (BASE PROJECT ALLOCATION - $8,000)
     4     (IV)  S.R.1005
     5         (A)  FROM C.P. MASON ROAD TO S.R.1003,
     6             LEMON TOWNSHIP, RESURFACING                    16,000
     7             (BASE PROJECT ALLOCATION - $16,000)
     8     (V)  S.R.1007
     9         (A)  FROM S.R.1005 TO PA 29, LEMON
    10             TOWNSHIP, RESURFACING                           4,000
    11             (BASE PROJECT ALLOCATION - $4,000)
    12     (VI)  PA 92
    13         (A)  FROM THE FALLS BRIDGE TO VILLAGE OF
    14             OSTERHOUT, FALLS TOWNSHIP, RESURFACING         70,000
    15             (BASE PROJECT ALLOCATION - $70,000)
    16         (B)  FROM S.R.1009 TO S.R.1011, LEMON
    17             TOWNSHIP, RESURFACING                          28,000
    18             (BASE PROJECT ALLOCATION - $28,000)
    19         (C)  FROM OSTERHOUT TO DEPARTMENT OF
    20             AGRICULTURE BUILDING, TUNKHANNOCK
    21             TOWNSHIP, RESURFACING                          38,000
    22             (BASE PROJECT ALLOCATION - $38,000)
    23     (VII)  PA 87
    24         (A)  FROM PROCTOR AND GAMBLE DRIVE TO
    25             U.S.6, WASHINGTON TOWNSHIP,
    26             RESURFACING                                    28,000
    27             (BASE PROJECT ALLOCATION - $28,000)
    28     (VIII)  PA 309
    29         (A)  FROM LUZERNE COUNTY TO T-352, ROADWAY
    30             IMPROVEMENTS                                  290,000
    19990H1023B3629                 - 200 -

     1             (BASE PROJECT ALLOCATION - $200,000)
     2             (LAND ALLOCATION - $40,000)
     3             (DESIGN AND CONTINGENCIES - $50,000)
     4         (B)  S.R.2007 TO RIVER BRIDGE, EATON
     5             TOWNSHIP, RESTORATION                         510,000
     6             (BASE PROJECT ALLOCATION - $400,000)
     7             (LAND ALLOCATION - $50,000)
     8             (DESIGN AND CONTINGENCIES - $60,000)
     9  (66)  YORK COUNTY
    10     (I)  S.R.0030
    11         (A)  PREVENTIVE MAINTENANCE ON S.R.0030
    12             BETWEEN S.R.0024 AND HALLAM
    13             INTERCHANGE                                   610,000
    14             (BASE PROJECT ALLOCATION - $500,000)
    15             (LAND ALLOCATION - $10,000)
    16             (DESIGN AND CONTINGENCIES - $100,000)
    17         (B)  U.S.30 FROM LANCASTER COUNTY LINE TO
    18             PA 462 JUNCTION, PAVEMENT RESTORATION,
    19             BRIDGE REHABILITATION AND SAFETY
    20             IMPROVEMENTS                                1,850,000
    21             (BASE PROJECT ALLOCATION - $1,800,000)
    22             (DESIGN AND CONTINGENCIES - $50,000)
    23     (II)  S.R.0074
    24         (A)  RECONSTRUCTION AND HIGHWAY SAFETY
    25             IMPROVEMENTS                                3,000,000
    26             (BASE PROJECT ALLOCATION - $1,000,000)
    27             (LAND ALLOCATION - $500,000)
    28             (DESIGN AND CONTINGENCIES - $1,500,000)
    29         (B)  INTERSECTION IMPROVEMENTS WITH PARK
    30             STREET, PLEASANT STREET AND WALNUT
    19990H1023B3629                 - 201 -

     1             STREET, DALLASTOWN BOROUGH                    205,000
     2             (BASE PROJECT ALLOCATION - $30,000)
     3             (LAND ALLOCATION - $25,000)
     4             (DESIGN AND CONTINGENCIES - $150,000)
     5     (III)  S.R.0083
     6         (A)  RECONSTRUCTION OF S.R.0083 FROM EXIT 4
     7             TO EXIT 5                                  10,017,000
     8             (BASE PROJECT ALLOCATION - $7,600,000)
     9             (LAND ALLOCATION - $600,000)
    10             (DESIGN AND CONTINGENCIES - $1,817,000)
    11         (B)  IMPROVEMENTS TO S.R.0083 FROM EXIT 6
    12             TO EXIT 8                                   1,220,000
    13             (BASE PROJECT ALLOCATION - $1,120,000)
    14             (DESIGN AND CONTINGENCIES - $100,000)
    15         (C)  SAFETY IMPROVEMENTS OF EXITS 1, 2 AND
    16             3 BY LENGTHENING THE RAMPS                    910,000
    17             (BASE PROJECT ALLOCATION - $800,000)
    18             (LAND ALLOCATION - $10,000)
    19             (DESIGN AND CONTINGENCIES - $100,000)
    20         (D)  IMPROVEMENTS TO EXIT 13                      160,000
    21             (BASE PROJECT ALLOCATION - $60,000)
    22             (LAND ALLOCATION - $25,000)
    23             (DESIGN AND CONTINGENCIES - $75,000)
    24         (E)  I-83 FROM MARYLAND STATE LINE TO
    25             CUMBERLAND COUNTY LINE, PAVEMENT
    26             RESTORATION, BRIDGE REHABILITATION AND
    27             SAFETY IMPROVEMENTS                         4,050,000
    28             (BASE PROJECT ALLOCATION - $4,000,000)
    29             (DESIGN AND CONTINGENCIES - $50,000)
    30     (IV)  S.R.0181
    19990H1023B3629                 - 202 -

     1         (A)  IMPROVEMENT OF INTERSECTION WITH
     2             S.R.0921, MANCHESTER BOROUGH                  120,000
     3             (BASE PROJECT ALLOCATION - $15,000)
     4             (LAND ALLOCATION - $30,000)
     5             (DESIGN AND CONTINGENCIES - $75,000)
     6     (V)  S.R.0194
     7         (A)  IMPROVEMENT OF INTERSECTION WITH
     8             S.R.4012, WASHINGTON TOWNSHIP                 450,000
     9             (BASE PROJECT ALLOCATION - $150,000)
    10             (LAND ALLOCATION - $100,000)
    11             (DESIGN AND CONTINGENCIES - $200,000)
    12     (VI)  S.R.0462
    13         (A)  RECONSTRUCTION OF INTERSECTION WITH
    14             HOKES MILL                                     70,000
    15             (BASE PROJECT ALLOCATION - $20,000)
    16             (LAND ALLOCATION - $10,000)
    17             (DESIGN AND CONTINGENCIES - $40,000)
    18         (B)  WIDEN FROM S.R.0024 TO LOCUST GROVE
    19             ROAD, SPRINGETTSBURY TOWNSHIP                 340,000
    20             (BASE PROJECT ALLOCATION - $300,000)
    21             (LAND ALLOCATION - $10,000)
    22             (DESIGN AND CONTINGENCIES - $30,000)
    23     (VII)  S.R.1033
    24         (A)  INTERSECTION IMPROVEMENTS WITH
    25             S.R.1012 AND S.R.0024, SPRINGETTSBURY
    26             TOWNSHIP                                      260,000
    27             (BASE PROJECT ALLOCATION - $200,000)
    28             (LAND ALLOCATION - $10,000)
    29             (DESIGN AND CONTINGENCIES - $50,000)
    30     (VIII)  S.R.3072
    19990H1023B3629                 - 203 -

     1         (A)  REALIGN MOULSTOWN ROAD FROM S.R.0194
     2             TO PENN TOWNSHIP LINE, HANOVER BOROUGH        400,000
     3             (BASE PROJECT ALLOCATION - $320,000)
     4             (LAND ALLOCATION - $20,000)
     5             (DESIGN AND CONTINGENCIES - $60,000)
     6     (IX)  S.R.0094
     7         (A)  WIDEN S.R.0094 FROM HANOVER ROAD TO
     8             KUHN DRIVE                                 10,306,000
     9             (BASE PROJECT ALLOCATION - $8,420,000)
    10             (LAND ALLOCATION - $206,000)
    11             (DESIGN AND CONTINGENCIES - $1,680,000)
    12         (B)  WIDEN AND SPOT RESURFACE S.R.0094 FROM
    13             GRANGER AVENUE AND SOUTH                    1,361,000
    14             (BASE PROJECT ALLOCATION - $1,130,000)
    15             (LAND ALLOCATION - $6,000)
    16             (DESIGN AND CONTINGENCIES - $225,000)
    17     (X)  S.R.3068
    18         (A)  WIDEN, RECONSTRUCTION AND
    19             SIGNALIZATION OF INTERSECTION WITH
    20             S.R.3070 AND BREEZEWOOD DRIVE, PENN
    21             TOWNSHIP                                      510,000
    22             (BASE PROJECT ALLOCATION - $410,000)
    23             (LAND ALLOCATION - $20,000)
    24             (DESIGN AND CONTINGENCIES - $80,000)
    25     (XI)  CENTER STREET
    26         (A)  WIDEN AND RECONSTRUCTION OF CENTER
    27             STREET FROM S.R.0116 TO RIDGE AVENUE,
    28             HANOVER BOROUGH AND PENN TOWNSHIP           1,500,000
    29             (BASE PROJECT ALLOCATION - $1,240,000)
    30             (LAND ALLOCATION - $10,000)
    19990H1023B3629                 - 204 -

     1             (DESIGN AND CONTINGENCIES - $250,000)
     2     (XII)  S.R.0024
     3         (A)  WIDEN S.R.0024 FROM CAROL ROAD TO
     4             WINDSOR ROAD                                5,200,000
     5             (BASE PROJECT ALLOCATION - $2,000,000)
     6             (LAND ALLOCATION - $700,000)
     7             (DESIGN AND CONTINGENCIES - $2,500,000)
     8     (XIII)  S.R.0124
     9         (A)  REALIGN S.R.0124 BY REMOVAL OF S CURVE
    10             NEAR CHRISTENSEN ROAD                       2,700,000
    11             (BASE PROJECT ALLOCATION - $1,100,000)
    12             (LAND ALLOCATION - $200,000)
    13             (DESIGN AND CONTINGENCIES - $1,400,000)
    14     (XIV)  S.R.2005
    15         (A)  CAMP BETTY WASHINGTON ROAD,
    16             ENGINEERING AND ENVIRONMENTAL STUDY           250,000
    17             (DESIGN AND CONTINGENCIES - $250,000)
    18     (XV)  S.R.0015
    19         (A)  U.S.15 FROM ADAMS COUNTY LINE TO
    20             CUMBERLAND COUNTY LINE, PAVEMENT
    21             RESTORATION, BRIDGE REHABILITATION AND
    22             SAFETY IMPROVEMENTS                           950,000
    23             (BASE PROJECT ALLOCATION - $900,000)
    24             (DESIGN AND CONTINGENCIES - $50,000)
    25  (67)  RAILROAD CROSSING PROJECTS
    26     (I)  ALLEGHENY COUNTY
    27         (A)  PURCHASE ROOK YARD AND RIGHT-OF-WAY
    28             SOUTH TO BRIDGEVILLE FROM WHEELING AND
    29             LAKE ERIE RAILROAD FOR USE AS NEW
    30             TRANSPORTATION CORRIDOR                    16,500,000
    19990H1023B3629                 - 205 -

     1     (II)  BEDFORD COUNTY
     2         (A)  INTERMODAL AND RAIL AND HIGHWAY
     3             ANALYSIS FOR BUSINESS DEVELOPMENT IN
     4             BEDFORD AND BLAIR COUNTIES                    300,000
     5     (III)  BERKS COUNTY
     6         (A)  BOROUGH OF TOPTON, REPAIR OF CONRAIL
     7             CROSSING GATES                                100,000
     8     (IV)  LUZERNE COUNTY
     9         (A)  BISCONTINI DISTRIBUTION CENTERS
    10             RELOCATE AND REHABILITATE RAIL SIDING
    11             TO BISCONTINI DISTRIBUTION CENTER TO
    12             HANDLE LARGER, SPECIAL PURPOSE RAIL
    13             CARS AND TO HANDLE INCREASE IN VOLUME,
    14             INCLUDING TWO RAIL SPURS, AN ADDITIONAL
    15             RAIL SWITCH, PREPARATION OF RAIL
    16             INFRASTRUCTURE AND RECONSTRUCTION OF
    17             INTERMODAL YARD INCLUDING ACCESS AND
    18             TEMPORARY STORAGE                             866,000
    19     (V)  PHILADELPHIA COUNTY
    20         (A)  CLEARANCE PROJECT TO CSX LINE
    21             BEGINNING AT PARK JUNCTION IN NORTH
    22             PHILADELPHIA AND CONTINUING NORTH TO
    23             THE PENNSYLVANIA/NEW JERSEY STATE LINE     10,000,000
    24         (B)  REHABILITATION OF TRACK, INCLUDING
    25             RAIL, TIES, SWITCHES AND ANY OTHER
    26             TRACK-RELATED REPAIR WORK AND THE
    27             PURCHASE OF REQUIRED LOADING AND
    28             UNLOADING EQUIPMENT FOR USE AT THE RAIL
    29             FACILITY AT GIRARD POINT                      900,000
    30     (VI)  MONROE COUNTY
    19990H1023B3629                 - 206 -

     1         (A)  MONROE RAIL AUTHORITY, IMPROVEMENT AND
     2             UPGRADE OF 10 RAILROAD CROSSINGS            1,500,000
     3     (VII)  ALLEGHENY AND EASTERN RAILROAD, INC.
     4         (A)  REPAIR AND/OR REHABILITATION OF GRADE
     5             CROSSINGS, INCLUDING TRACKS, TIES,
     6             SURFACES, SUBSURFACES, SIGNALS,
     7             AUTOMATIC OR MANUAL PROTECTION AND ANY
     8             OTHER RELATED WORK                            462,000
     9     (VIII)  ALLEGHENY VALLEY RAILROAD
    10         (A)  REPAIR AND/OR REHABILITATION OF GRADE
    11             CROSSINGS, INCLUDING TRACKS, TIES,
    12             SURFACES, SUBSURFACES, SIGNALS,
    13             AUTOMATIC OR MANUAL PROTECTION AND ANY
    14             OTHER RELATED WORK                            207,000
    15     (IX)  BRADFORD INDUSTRIAL RAILROAD, INC.
    16         (A)  REPAIR AND/OR REHABILITATION OF GRADE
    17             CROSSINGS, INCLUDING TRACKS, TIES,
    18             SURFACES, SUBSURFACES, SIGNALS,
    19             AUTOMATIC OR MANUAL PROTECTION AND ANY
    20             OTHER RELATED WORK                             45,000
    21     (X)  BUFFALO AND PITTSBURGH RAILROAD, INC.
    22         (A)  REPAIR AND/OR REHABILITATION OF GRADE
    23             CROSSINGS, INCLUDING TRACKS, TIES,
    24             SURFACES, SUBSURFACES, SIGNALS,
    25             AUTOMATIC OR MANUAL PROTECTION AND ANY
    26             OTHER RELATED WORK                            508,000
    27     (XI)  DELAWARE AND HUDSON RAILWAY CO.
    28         (A)  REPAIR AND/OR REHABILITATION OF GRADE
    29             CROSSINGS, INCLUDING TRACKS, TIES,
    30             SURFACES, SUBSURFACES, SIGNALS,
    19990H1023B3629                 - 207 -

     1             AUTOMATIC OR MANUAL PROTECTION AND ANY
     2             OTHER RELATED WORK                            172,000
     3         (B)  REPLACEMENT OF SIGNAL FACILITIES WITH
     4             SOLID STATE INTERLOCKINGS AND
     5             ASSOCIATED CABLING, TRACK SIDE SIGNALS
     6             AND ELECTRONICS                               660,000
     7             (BASE PROJECT ALLOCATION - $600,000)
     8             (DESIGN AND CONTINGENCIES - $60,000)
     9         (C)  REHABILITATE CROSSING AT S.R.0339 WITH
    10             NEW STATE-OF-THE-ART AUTOMATIC HIGHWAY
    11             WARNING DEVICES AND NEW CROSSING
    12             SURFACE INCLUDING TRACK AND RAIL
    13             INTERFACE MATERIALS                           259,000
    14             (BASE PROJECT ALLOCATION - $235,000)
    15             (DESIGN AND CONTINGENCIES - $24,000)
    16     (XII)  DELAWARE AND LACKAWANNA RAILROAD COMPANY
    17         (A)  REPAIR AND/OR REHABILITATION OF GRADE
    18             CROSSINGS INCLUDING TRACKS, TIES,
    19             SURFACES, SUBSURFACES, SIGNALS,
    20             AUTOMATIC OR MANUAL PROTECTION AND ANY
    21             OTHER RELATED WORK                            630,000
    22     (XIII)  EMONS TRANSPORTATION GROUP, INC.
    23         (A)  REPAIR AND/OR REHABILITATION OF GRADE
    24             CROSSINGS, INCLUDING TRACKS, TIES,
    25             SURFACES, SUBSURFACES, AUTOMATIC OR
    26             MANUAL PROTECTION AND ANY OTHER RELATED
    27             WORK
    28             (I)  MARYLAND AND PENNSYLVANIA
    29                 RAILROAD                                  570,000
    30             (II)  PENN EASTERN RAIL LINES, INC.,
    19990H1023B3629                 - 208 -

     1                 LANCASTER LINE                            789,000
     2             (III)  PERKIOMEN LINE                         405,000
     3             (IV)  YORKRAIL, INC.                          640,000
     4     (XIV)  EVERETT RAILROAD
     5         (A)  REPAIR AND/OR REHABILITATION OF GRADE
     6             CROSSINGS, INCLUDING TRACKS, TIES,
     7             SURFACES, SUBSURFACES, AUTOMATIC OR
     8             MANUAL PROTECTION AND ANY OTHER RELATED
     9             WORK                                          270,000
    10     (XV)  GETTYSBURG RAILROAD COMPANY, INC.
    11         (A)  REPAIR AND/OR REHABILITATION OF GRADE
    12             CROSSINGS, INCLUDING TRACKS, TIES,
    13             SURFACES, SUBSURFACES, SIGNALS,
    14             AUTOMATIC OR MANUAL PROTECTION AND ANY
    15             OTHER RELATED WORK                            460,000
    16     (XVI)  HOLLIDAYSBURG AND ROARING SPRING
    17     RAILROAD
    18         (A)  REPAIR AND/OR REHABILITATION OF GRADE
    19             CROSSINGS, INCLUDING TRACKS, TIES,
    20             SURFACES, SUBSURFACES, SIGNALS,
    21             AUTOMATIC OR MANUAL PROTECTION AND ANY
    22             OTHER RELATED WORK                            400,000
    23     (XVII)  JUNIATA VALLEY RAILROAD
    24         (A)  REPAIR AND/OR REHABILITATION OF GRADE
    25             CROSSINGS, INCLUDING TRACKS, TIES,
    26             SURFACES, SUBSURFACES, SIGNALS,
    27             AUTOMATIC OR MANUAL PROTECTION AND ANY
    28             OTHER RELATED WORK                            133,000
    29     (XVIII)  LYCOMING VALLEY RAILROAD
    30         (A)  REPAIR AND/OR REHABILITATION OF GRADE
    19990H1023B3629                 - 209 -

     1             CROSSINGS, INCLUDING TRACKS, TIES,
     2             SURFACES, SUBSURFACES, SIGNALS,
     3             AUTOMATIC OR MANUAL PROTECTION AND ANY
     4             OTHER RELATED WORK                            116,000
     5     (XIX)  MIDDLETOWN AND HUMMELSTOWN RAILROAD CO.
     6         (A)  REPAIR AND REHABILITATION OF GRADE
     7             CROSSING AT ROUTE 230, INCLUDING
     8             TRACKS, TIES, SURFACES, SUBSURFACES AND
     9             ANY OTHER RELATED WORK TO ENSURE
    10             CONTINUED REGULATORY COMPLIANCE AND
    11             ENHANCE PUBLIC SAFETY                          30,000
    12     (XX)  MORRISON'S COVE RAILROAD
    13         (A)  REPAIR AND/OR REHABILITATION OF GRADE
    14             CROSSINGS, INCLUDING TRACKS, TIES,
    15             SURFACES, SUBSURFACES, SIGNALS,
    16             AUTOMATIC OR MANUAL PROTECTION AND ANY
    17             OTHER RELATED WORK                            120,000
    18     (XXI)  NITTANY BALD EAGLE RAILROAD
    19         (A)  REPAIR AND/OR REHABILITATION OF GRADE
    20             CROSSINGS, INCLUDING TRACKS, TIES,
    21             SURFACES, SUBSURFACES, SIGNALS,
    22             AUTOMATIC OR MANUAL PROTECTION AND ANY
    23             OTHER RELATED WORK                            287,000
    24     (XXII)  NORTH SHORE RAILROAD
    25         (A)  REPAIR AND/OR REHABILITATION OF GRADE
    26             CROSSINGS, INCLUDING TRACKS, TIES,
    27             SURFACES, SUBSURFACES, SIGNALS,
    28             AUTOMATIC OR MANUAL PROTECTION AND ANY
    29             OTHER RELATED WORK                             62,000
    30     (XXIII)  PITTSBURGH & SHAWMUT RAILROAD, INC.
    19990H1023B3629                 - 210 -

     1         (A)  REPAIR AND/OR REHABILITATION OF GRADE
     2             CROSSINGS, INCLUDING TRACKS, TIES,
     3             SURFACES, SUBSURFACES, SIGNALS,
     4             AUTOMATIC OR MANUAL PROTECTION AND ANY
     5             OTHER RELATED WORK                            343,000
     6     (XXIV)  READING, BLUE MOUNTAIN AND NORTHERN
     7             RAILROAD COMPANY
     8         (A)  REPAIR AND/OR REHABILITATION OF GRADE
     9             CROSSINGS, INCLUDING TRACKS, TIES,
    10             SURFACES, SUBSURFACES, SIGNALS,
    11             AUTOMATIC OR MANUAL PROTECTION AND ANY
    12             OTHER RELATED WORK                            850,000
    13     (XXV)  SEDA-COG JOINT RAIL AUTHORITY
    14         (A)  REPAIR AND/OR REHABILITATION OF GRADE
    15             CROSSINGS, INCLUDING TRACKS, TIES,
    16             SURFACES, SUBSURFACES, SIGNALS,
    17             AUTOMATIC OR MANUAL PROTECTION AND ANY
    18             OTHER RELATED WORK
    19             (I)  JUNIATA VALLEY RAILROAD                   50,000
    20             (II)  LYCOMING VALLEY RAILROAD                167,000
    21             (III)  NITTANY & BALD EAGLE                   260,000
    22             (IV)  NORTH SHORE RAILROAD                    200,000
    23             (V)  SHAMOKIN VALLEY RAILROAD                 127,000
    24     (XXVI)  SHAMOKIN VALLEY RAILROAD
    25         (A)  REPAIR AND/OR REHABILITATION OF GRADE
    26             CROSSINGS, INCLUDING TRACKS, TIES,
    27             SURFACES, SUBSURFACES, SIGNALS,
    28             AUTOMATIC OR MANUAL PROTECTION AND ANY
    29             OTHER RELATED WORK                            672,000
    30     (XXVII)  WELLSBORO AND CORNING RAIL LINE
    19990H1023B3629                 - 211 -

     1         (A)  REPAIR AND/OR REHABILITATION OF GRADE
     2             CROSSINGS, INCLUDING TRACKS, TIES,
     3             SURFACES, SUBSURFACES, SIGNALS,
     4             AUTOMATIC OR MANUAL PROTECTION AND ANY
     5             OTHER RELATED WORK                             86,000
     6     (XXVIII)  WHEELING AND LAKE ERIE RAILWAY
     7         COMPANY
     8         (A)  REPAIR AND/OR REHABILITATION OF GRADE
     9             CROSSINGS, INCLUDING TRACKS, TIES,
    10             SURFACES, SUBSURFACES, SIGNALS,
    11             AUTOMATIC OR MANUAL PROTECTION AND ANY
    12             OTHER RELATED WORK                            645,000
    13     (XXIX)  STATEWIDE
    14         (A)  ACQUISITION AND INSTALLATION OF
    15             CONSTANT WARNING TIME DEVICES TO
    16             UPGRADE AND IMPROVE SAFETY OF HIGHWAY-
    17             RAIL GRADE CROSSINGS ON ANY ROAD
    18             INCLUDING LOCAL ROADS. TWENTY PERCENT
    19             OF THE COST OF EACH SUCH ACQUISITION
    20             AND INSTALLATION SHALL BE PAID BY THE
    21             RAILROAD THAT OWNS THE TRACK UPON WHICH
    22             THE IMPROVEMENTS ARE BEING INSTALLED       10,000,000
    23  SECTION 12.  ITEMIZATION OF PENNSYLVANIA FISH AND BOAT
    24                 COMMISSION CAPITAL PROJECTS.
    25     THE INDIVIDUAL CAPITAL PROJECTS IN THE CATEGORY OF PUBLIC
    26  IMPROVEMENT PROJECTS TO BE ACQUIRED OR DEVELOPED BY THE
    27  PENNSYLVANIA FISH AND BOAT COMMISSION AND TO BE FINANCED FROM
    28  CURRENT REVENUES OF THE FISH FUND AND THE BOAT FUND PURSUANT TO
    29  EXECUTIVE AUTHORIZATIONS ARE HEREBY ITEMIZED TOGETHER WITH THEIR
    30  RESPECTIVE ESTIMATED COSTS, AS FOLLOWS:
    19990H1023B3629                 - 212 -

     1                                                           TOTAL  
     2                                                          PROJECT 
     3             PROJECT                                    ALLOCATION
     4  (1)  PENNSYLVANIA FISH AND BOAT COMMISSION
     5     (I)  LEHIGH COUNTY
     6         (A)  IMPROVEMENTS AND REPAIRS TO THE DAM
     7             AND SPILLWAY AT LEASER LAKE                 1,200,000
     8             (BASE PROJECT ALLOCATION - $1,000,000)
     9             (DESIGN AND CONTINGENCIES - $200,000)
    10  SECTION 13.  ITEMIZATION OF PENNSYLVANIA GAME COMMISSION CAPITAL
    11                 PROJECTS.
    12     THE INDIVIDUAL CAPITAL PROJECTS IN THE CATEGORY OF PUBLIC
    13  IMPROVEMENT PROJECTS TO BE ACQUIRED BY THE PENNSYLVANIA GAME
    14  COMMISSION, AND TO BE FINANCED FROM CURRENT REVENUES OF THE GAME
    15  FUND PURSUANT TO EXECUTIVE AUTHORIZATIONS, ARE HEREBY ITEMIZED,
    16  TOGETHER WITH THEIR RESPECTIVE ESTIMATED COSTS, AS FOLLOWS:
    17  (1)  CLINTON COUNTY
    18     (I)  LAND ACQUISITION - 3,300 ACRES                   570,000
    19  SECTION 14.  ITEMIZATION OF GENERAL FUND CURRENT REVENUE
    20                 PROJECTS.
    21     (A)  PUBLIC IMPROVEMENT PROJECTS.--THE INDIVIDUAL CAPITAL
    22  PROJECTS IN THE CATEGORY OF PUBLIC IMPROVEMENT PROJECTS TO BE
    23  CONSTRUCTED OR ACQUIRED BY THE DEPARTMENT OF GENERAL SERVICES,
    24  ITS SUCCESSORS OR ASSIGNS, AND TO BE FINANCED FROM GENERAL FUND
    25  CURRENT REVENUES, ARE HEREBY ITEMIZED, TOGETHER WITH THEIR
    26  RESPECTIVE ESTIMATED FINANCIAL COSTS, AS FOLLOWS:
    27                                                           TOTAL  
    28                                                          PROJECT 
    29             PROJECT                                    ALLOCATION
    30  (1)  DEPARTMENT OF CORRECTIONS
    19990H1023B3629                 - 213 -

     1     (I)  STATE CORRECTIONAL INSTITUTION - GREENE
     2         (A)  INSTALLATION OF PERIMETER FENCE              600,000
     3             (BASE PROJECT ALLOCATION - $500,000)
     4             (DESIGN AND CONTINGENCIES - $100,000)
     5     (II)  STATE REGIONAL CORRECTIONAL FACILITY -
     6         MERCER
     7         (A)  INSTALLATION OF PERIMETER FENCE              810,000
     8             (BASE PROJECT ALLOCATION - $675,000)
     9             (DESIGN AND CONTINGENCIES - $135,000)
    10  (2)  DEPARTMENT OF GENERAL SERVICES
    11     (I)  CAPITOL AREA BUILDINGS
    12         (A)  CONSTRUCTION OF THE COMMONWEALTH MAIL
    13             PROCESSING AND LEGISLATIVE SERVICES
    14             FACILITY                                    5,000,000
    15     (B)  FURNITURE AND EQUIPMENT.--THE INDIVIDUAL CAPITAL
    16  PROJECTS IN THE CATEGORY OF PUBLIC IMPROVEMENT PROJECTS
    17  CONSISTING OF THE ACQUISITION OF ORIGINAL FURNITURE AND
    18  EQUIPMENT TO COMPLETE PUBLIC IMPROVEMENT PROJECTS AND TO BE
    19  PURCHASED BY THE DEPARTMENT OF GENERAL SERVICES, ITS SUCCESSORS
    20  OR ASSIGNS AND TO BE FINANCED FROM GENERAL FUND CURRENT REVENUES
    21  ARE HEREBY ITEMIZED TOGETHER WITH THEIR RESPECTIVE ITEMIZED
    22  COSTS AS FOLLOWS:
    23                                                           TOTAL  
    24                                                          PROJECT 
    25             PROJECT                                    ALLOCATION
    26  (1)  DEPARTMENT OF GENERAL SERVICES
    27     (I)  CAPITOL AREA BUILDINGS
    28         (A)  FURNITURE AND EQUIPMENT FOR
    29             COMMONWEALTH MAIL PROCESSING AND
    30             LEGISLATIVE SERVICES FACILITY               8,000,000
    19990H1023B3629                 - 214 -

     1  SECTION 15.  ITEMIZATION OF MOTOR LICENSE FUND CURRENT REVENUES.
     2     THE INDIVIDUAL CAPITAL PROJECTS IN THE CATEGORY OF PUBLIC
     3  IMPROVEMENT PROJECTS TO BE DEVELOPED BY THE DEPARTMENT OF
     4  GENERAL SERVICES, ITS SUCCESSORS OR ASSIGNS, FOR THE DEPARTMENT
     5  OF TRANSPORTATION ARE HEREBY ITEMIZED TOGETHER WITH THEIR
     6  RESPECTIVE ITEMIZED COSTS AS FOLLOWS:
     7                                                           TOTAL  
     8                                                          PROJECT 
     9             PROJECT                                    ALLOCATION
    10  (1)  DEPARTMENT OF TRANSPORTATION
    11     (I)  HIGHWAY MAINTENANCE FACILITY, CUMBERLAND
    12         COUNTY
    13         (A)  CONSTRUCT OR ACQUIRE A REPLACEMENT
    14             MAINTENANCE FACILITY                        4,000,000
    15             (BASE PROJECT ALLOCATION - $4,000,000)
    16     (II)  EXPAND/REPLACE DRIVER LICENSING CENTER,
    17         ALLEGHENY COUNTY
    18         (A)  EXPAND OR REPLACE THE DRIVER LICENSING
    19             FACILITY AT NEW KENSINGTON                  1,000,000
    20             (BASE PROJECT ALLOCATION - $1,000,000)
    21     (III)  HIGHWAY MAINTENANCE FACILITY, SULLIVAN
    22         COUNTY
    23         (A)  CONSTRUCT OR ACQUIRE A REPLACEMENT
    24             MAINTENANCE FACILITY                        2,500,000
    25             (BASE PROJECT ALLOCATION - $2,500,000)
    26  SECTION 16.  LIMITED WAIVER OF LOCAL REQUIREMENTS.
    27     THE LIMITATION ON DEPARTMENT OF TRANSPORTATION FUNDING OF
    28  CAPITAL PROJECTS UNDER 74 PA.C.S. § 1302(4) (RELATING TO PROGRAM
    29  AUTHORIZATIONS) SHALL BE TOTALLY WAIVED FOR THE CAPITAL PROJECTS
    30  IN THE CATEGORY OF TRANSPORTATION ASSISTANCE PROJECTS FOR MASS
    19990H1023B3629                 - 215 -

     1  TRANSIT CONTAINED IN SECTION 6(A)(10)(VII), (VIII), (XII) AND
     2  (XIII).
     3  SECTION 17.  DEBT AUTHORIZATION.
     4     (A)  PUBLIC IMPROVEMENTS.--THE GOVERNOR, AUDITOR GENERAL AND
     5  STATE TREASURER ARE HEREBY AUTHORIZED AND DIRECTED TO BORROW
     6  FROM TIME TO TIME IN ADDITION TO ANY AUTHORIZATION HERETOFORE OR
     7  HEREAFTER ENACTED, ON THE CREDIT OF THE COMMONWEALTH, SUBJECT TO
     8  THE LIMITATIONS PROVIDED IN THE CURRENT CAPITAL BUDGET, MONEY
     9  NOT EXCEEDING IN THE AGGREGATE THE SUM OF $557,240,000 AS MAY BE
    10  FOUND NECESSARY TO CARRY OUT THE ACQUISITION AND CONSTRUCTION OF
    11  THE PUBLIC IMPROVEMENT PROJECTS SPECIFICALLY ITEMIZED IN A
    12  CAPITAL BUDGET.
    13     (B)  FURNITURE AND EQUIPMENT.--THE GOVERNOR, AUDITOR GENERAL
    14  AND STATE TREASURER ARE HEREBY AUTHORIZED AND DIRECTED TO BORROW
    15  FROM TIME TO TIME IN ADDITION TO ANY AUTHORIZATION HERETOFORE OR
    16  HEREAFTER ENACTED, ON THE CREDIT OF THE COMMONWEALTH, SUBJECT TO
    17  THE LIMITATIONS PROVIDED IN THE CURRENT CAPITAL BUDGET, MONEY
    18  NOT EXCEEDING IN THE AGGREGATE THE SUM OF $16,194,000 AS MAY BE
    19  FOUND NECESSARY TO CARRY OUT THE PUBLIC IMPROVEMENT PROJECTS
    20  CONSISTING OF THE ACQUISITION OF ORIGINAL MOVABLE FURNITURE AND
    21  EQUIPMENT SPECIFICALLY ITEMIZED IN A CAPITAL BUDGET.
    22     (C)  TRANSPORTATION ASSISTANCE.--THE GOVERNOR, AUDITOR
    23  GENERAL AND STATE TREASURER ARE HEREBY AUTHORIZED AND DIRECTED
    24  TO BORROW FROM TIME TO TIME IN ADDITION TO ANY AUTHORIZATION
    25  HERETOFORE OR HEREAFTER ENACTED, ON THE CREDIT OF THE
    26  COMMONWEALTH, SUBJECT TO THE LIMITATIONS PROVIDED IN THE CURRENT
    27  CAPITAL BUDGET, MONEY NOT EXCEEDING IN THE AGGREGATE THE SUM OF
    28  $561,168,000 AS MAY BE FOUND NECESSARY TO CARRY OUT THE
    29  ACQUISITION AND CONSTRUCTION OF THE TRANSPORTATION ASSISTANCE
    30  PROJECTS SPECIFICALLY ITEMIZED IN A CAPITAL BUDGET.
    19990H1023B3629                 - 216 -

     1     (D)  REDEVELOPMENT ASSISTANCE.--SUBJECT TO THE LIMITATION IN
     2  SECTION 317(B) OF THE ACT OF FEBRUARY 1, 1999 (P.L.1, NO.1),
     3  KNOWN AS THE CAPITAL FACILITIES DEBT ENABLING ACT, THE GOVERNOR,
     4  AUDITOR GENERAL AND STATE TREASURER ARE HEREBY AUTHORIZED AND
     5  DIRECTED TO BORROW FROM TIME TO TIME IN ADDITION TO ANY
     6  AUTHORIZATION HERETOFORE OR HEREAFTER ENACTED, ON THE CREDIT OF
     7  THE COMMONWEALTH, SUBJECT TO THE LIMITATIONS PROVIDED IN THE
     8  CURRENT CAPITAL BUDGET, MONEY NOT EXCEEDING IN THE AGGREGATE THE
     9  SUM OF $540,413,000 AS MAY BE FOUND NECESSARY TO CARRY OUT THE
    10  REDEVELOPMENT ASSISTANCE AND THE REDEVELOPMENT CAPITAL
    11  ASSISTANCE PROJECTS SPECIFICALLY ITEMIZED IN A CAPITAL BUDGET.
    12     (E)  FLOOD CONTROL.--THE GOVERNOR, AUDITOR GENERAL AND STATE
    13  TREASURER ARE HEREBY AUTHORIZED AND DIRECTED TO BORROW FROM TIME
    14  TO TIME IN ADDITION TO ANY AUTHORIZATION HERETOFORE OR HEREAFTER
    15  ENACTED, ON THE CREDIT OF THE COMMONWEALTH, SUBJECT TO THE
    16  LIMITATIONS PROVIDED IN THE CURRENT CAPITAL BUDGET, MONEY NOT
    17  EXCEEDING IN THE AGGREGATE THE SUM OF $7,859,000 AS MAY BE FOUND
    18  NECESSARY TO CARRY OUT THE ACQUISITION AND CONSTRUCTION OF THE
    19  FLOOD CONTROL PROJECTS SPECIFICALLY ITEMIZED IN A CAPITAL
    20  BUDGET.
    21     (F)  HIGHWAY PROJECTS.--THE GOVERNOR, AUDITOR GENERAL AND
    22  STATE TREASURER ARE HEREBY AUTHORIZED AND DIRECTED TO BORROW,
    23  FROM TIME TO TIME, IN ADDITION TO ANY AUTHORIZATION HERETOFORE
    24  OR HEREAFTER ENACTED, ON THE CREDIT OF THE COMMONWEALTH, SUBJECT
    25  TO THE LIMITATIONS PROVIDED IN THE CURRENT CAPITAL BUDGET, MONEY
    26  NOT EXCEEDING IN THE AGGREGATE THE SUM OF $2,416,468,000 AS MAY
    27  BE FOUND NECESSARY TO CARRY OUT THE ACQUISITION AND CONSTRUCTION
    28  OF THE HIGHWAY PROJECTS SPECIFICALLY ITEMIZED IN SECTION 11 OF
    29  THIS CAPITAL BUDGET.
    30  SECTION 18.  ISSUE OF BONDS.
    19990H1023B3629                 - 217 -

     1     THE INDEBTEDNESS AUTHORIZED IN THIS ACT SHALL BE INCURRED,
     2  FROM TIME TO TIME, AND SHALL BE EVIDENCED BY ONE OR MORE SERIES
     3  OF GENERAL OBLIGATION BONDS OF THE COMMONWEALTH IN SUCH
     4  AGGREGATE PRINCIPAL AMOUNT FOR EACH SERIES AS THE GOVERNOR, THE
     5  AUDITOR GENERAL AND THE STATE TREASURER SHALL DETERMINE, BUT THE
     6  LATEST STATED MATURITY DATE SHALL NOT EXCEED THE ESTIMATED
     7  USEFUL LIFE OF THE PROJECTS BEING FINANCED AS STATED IN SECTION
     8  19.
     9  SECTION 19.  ESTIMATED USEFUL LIFE AND TERM OF DEBT.
    10     (A)  ESTIMATED USEFUL LIFE.--THE GENERAL ASSEMBLY STATES THAT
    11  THE ESTIMATED USEFUL LIFE OF THE PUBLIC IMPROVEMENT PROJECTS
    12  ITEMIZED IN THIS ACT IS AS FOLLOWS:
    13         (1)  PUBLIC IMPROVEMENT PROJECTS, 30 YEARS.
    14         (2)  FURNITURE AND EQUIPMENT PROJECTS, 10 YEARS.
    15         (3)  TRANSPORTATION ASSISTANCE PROJECTS:
    16             (I)  ROLLING STOCK, 15 YEARS.
    17             (II)  PASSENGER BUSES, 12 YEARS.
    18             (III)  FURNITURE AND EQUIPMENT, 10 YEARS.
    19             (IV)  ALL OTHERS, 30 YEARS.
    20         (4)  PUBLIC HIGHWAY PROJECTS, 30 YEARS.
    21     (B)  TERM OF DEBT.--THE MAXIMUM TERM OF THE DEBT AUTHORIZED
    22  TO BE INCURRED UNDER THIS ACT IS 30 YEARS.
    23  SECTION 20.  APPROPRIATIONS.
    24     (A)  PUBLIC IMPROVEMENTS.--THE NET PROCEEDS OF THE SALE OF
    25  THE OBLIGATIONS AUTHORIZED IN THIS ACT ARE HEREBY APPROPRIATED
    26  FROM THE CAPITAL FACILITIES FUND TO THE DEPARTMENT OF GENERAL
    27  SERVICES IN THE MAXIMUM AMOUNT OF $557,240,000 TO BE USED BY IT
    28  EXCLUSIVELY TO DEFRAY THE FINANCIAL COST OF THE PUBLIC
    29  IMPROVEMENT PROJECTS SPECIFICALLY ITEMIZED IN A CAPITAL BUDGET.
    30  AFTER RESERVING OR PAYING THE EXPENSES OF THE SALE OF THE
    19990H1023B3629                 - 218 -

     1  OBLIGATION, THE STATE TREASURER SHALL PAY TO THE DEPARTMENT OF
     2  GENERAL SERVICES THE MONEYS AS REQUIRED AND CERTIFIED BY IT TO
     3  BE LEGALLY DUE AND PAYABLE.
     4     (B)  FURNITURE AND EQUIPMENT.--THE NET PROCEEDS OF THE SALE
     5  OF THE OBLIGATIONS AUTHORIZED IN THIS ACT ARE HEREBY
     6  APPROPRIATED FROM THE CAPITAL FACILITIES FUND TO THE DEPARTMENT
     7  OF GENERAL SERVICES IN THE MAXIMUM AMOUNT OF $16,194,000 TO BE
     8  USED BY IT EXCLUSIVELY TO DEFRAY THE FINANCIAL COST OF THE
     9  PUBLIC IMPROVEMENT PROJECTS CONSISTING OF THE ACQUISITION OF
    10  ORIGINAL MOVABLE FURNITURE AND EQUIPMENT SPECIFICALLY ITEMIZED
    11  IN A CAPITAL BUDGET. AFTER RESERVING OR PAYING THE EXPENSES OF
    12  THE SALE OF THE OBLIGATION, THE STATE TREASURER SHALL PAY TO THE
    13  DEPARTMENT OF GENERAL SERVICES THE MONEYS AS REQUIRED AND
    14  CERTIFIED BY IT TO BE LEGALLY DUE AND PAYABLE.
    15     (C)  TRANSPORTATION ASSISTANCE.--THE NET PROCEEDS OF THE SALE
    16  OF THE OBLIGATIONS AUTHORIZED IN THIS ACT ARE HEREBY
    17  APPROPRIATED FROM THE CAPITAL FACILITIES FUND TO THE DEPARTMENT
    18  OF TRANSPORTATION IN THE MAXIMUM AMOUNT OF $561,168,000 TO BE
    19  USED BY IT EXCLUSIVELY TO DEFRAY THE FINANCIAL COST OF THE
    20  TRANSPORTATION ASSISTANCE PROJECTS SPECIFICALLY ITEMIZED IN A
    21  CAPITAL BUDGET. AFTER RESERVING OR PAYING THE EXPENSE OF THE
    22  SALE OF THE OBLIGATION, THE STATE TREASURER SHALL PAY TO THE
    23  DEPARTMENT OF TRANSPORTATION THE MONEYS AS REQUIRED AND
    24  CERTIFIED BY IT TO BE LEGALLY DUE AND PAYABLE.
    25     (D)  REDEVELOPMENT ASSISTANCE.--THE NET PROCEEDS OF THE SALE
    26  OF THE OBLIGATIONS AUTHORIZED IN THIS ACT ARE HEREBY
    27  APPROPRIATED FROM THE CAPITAL FACILITIES FUND TO THE DEPARTMENT
    28  OF COMMUNITY AND ECONOMIC DEVELOPMENT IN THE MAXIMUM AMOUNT OF
    29  $540,413,000 TO BE USED BY IT EXCLUSIVELY TO DEFRAY THE
    30  FINANCIAL COST OF THE REDEVELOPMENT ASSISTANCE AND REDEVELOPMENT
    19990H1023B3629                 - 219 -

     1  CAPITAL ASSISTANCE PROJECTS SPECIFICALLY ITEMIZED IN A CAPITAL
     2  BUDGET. AFTER RESERVING OR PAYING THE EXPENSES OF THE SALE OF
     3  THE OBLIGATION, THE STATE TREASURER SHALL PAY TO THE DEPARTMENT
     4  OF COMMUNITY AND ECONOMIC DEVELOPMENT THE MONEYS AS REQUIRED AND
     5  CERTIFIED BY IT TO BE LEGALLY DUE AND PAYABLE.
     6     (E)  FLOOD CONTROL.--THE NET PROCEEDS OF THE SALE OF THE
     7  OBLIGATIONS AUTHORIZED IN THIS ACT ARE HEREBY APPROPRIATED FROM
     8  THE CAPITAL FACILITIES FUND TO THE DEPARTMENT OF ENVIRONMENTAL
     9  PROTECTION IN THE MAXIMUM AMOUNT OF $7,859,000 TO BE USED BY IT
    10  EXCLUSIVELY TO DEFRAY THE FINANCIAL COST OF THE FLOOD CONTROL
    11  PROJECTS SPECIFICALLY ITEMIZED IN A CAPITAL BUDGET. AFTER
    12  RESERVING OR PAYING THE EXPENSE OF THE SALE OF THE OBLIGATION,
    13  THE STATE TREASURER SHALL PAY TO THE DEPARTMENT OF ENVIRONMENTAL
    14  PROTECTION THE MONEYS AS REQUIRED AND CERTIFIED BY IT TO BE
    15  LEGALLY DUE AND PAYABLE.
    16     (F)  HIGHWAY PROJECTS.--THE NET PROCEEDS OF THE SALE OF THE
    17  OBLIGATIONS HEREIN AUTHORIZED ARE HEREBY APPROPRIATED FROM THE
    18  CAPITAL FACILITIES FUND TO THE DEPARTMENT OF TRANSPORTATION IN
    19  THE MAXIMUM AMOUNT OF $2,416,468,000 TO BE USED BY IT
    20  EXCLUSIVELY TO DEFRAY THE FINANCIAL COSTS OF THE PROJECTS
    21  SPECIFICALLY ITEMIZED IN SECTION 11 OF THIS CAPITAL BUDGET.
    22  AFTER RESERVING OR PAYING THE EXPENSES OF THE SALE OF THE
    23  OBLIGATION, THE STATE TREASURER SHALL PAY OUT TO THE DEPARTMENT
    24  OF TRANSPORTATION THE MONEYS AS REQUIRED AND CERTIFIED BY IT TO
    25  BE LEGALLY DUE AND PAYABLE.
    26  SECTION 21.  FEDERAL FUNDS.
    27     (A)  PROJECTS ITEMIZED IN THIS ACT.--IN ADDITION TO THOSE
    28  FUNDS APPROPRIATED IN SECTION 20, ALL MONEYS RECEIVED FROM THE
    29  FEDERAL GOVERNMENT FOR THE PROJECTS SPECIFICALLY ITEMIZED IN
    30  THIS ACT ARE ALSO HEREBY APPROPRIATED FOR THOSE PROJECTS.
    19990H1023B3629                 - 220 -

     1     (B)  PROJECTS NOT REQUIRING ITEMIZATION.--DEPARTMENT OF
     2  MILITARY AND VETERANS AFFAIRS CONSTRUCTION PROJECTS WHICH ARE
     3  TOTALLY FEDERALLY FUNDED BUT WHICH ARE TO BE ADMINISTERED BY THE
     4  DEPARTMENT OF GENERAL SERVICES ARE HEREBY AUTHORIZED.
     5  SECTION 22.  LOCAL FUNDS.
     6     ALL MONEYS RECEIVED FROM A POLITICAL SUBDIVISION, MUNICIPAL
     7  AUTHORITY OR OTHER UNIT OF LOCAL GOVERNMENT FOR THE PROJECT
     8  AUTHORIZED IN SECTION 4(2)(XI)(B), ARE ALSO HEREBY APPROPRIATED
     9  FOR SAID PROJECT.
    10  SECTION 23.  EXPIRATION OF AUTHORIZATION AND APPROPRIATION.
    11     (A)  GENERAL RULE.--THE AUTHORIZATION AND APPROPRIATION FOR
    12  THE ADDITIONAL CAPITAL PROJECTS ITEMIZED IN SECTIONS 4, 5, 6, 7,
    13  8, 9 AND 10 FOR WHICH CONSTRUCTION CONTRACTS HAVE NOT BEEN
    14  EXECUTED WITHIN FOUR YEARS OF THE EFFECTIVE DATE OF THIS ACT
    15  SHALL EXPIRE UPON SUCH DATE AND SHALL BE CONSIDERED REPEALED.
    16  THE SECRETARY OF THE BUDGET MAY EXTEND AN EXPIRED PROJECT FOR UP
    17  TO ONE YEAR UPON WRITTEN NOTIFICATION OF THE CHAIRMAN AND
    18  MINORITY CHAIRMAN OF THE APPROPRIATIONS COMMITTEE OF THE SENATE
    19  AND THE CHAIRMAN AND MINORITY CHAIRMAN OF THE APPROPRIATIONS
    20  COMMITTEE OF THE HOUSE OF REPRESENTATIVES. UPON EXPIRATION OF
    21  THE EXTENSION PERIOD, AN EXTENDED PROJECT MAY NOT BE
    22  SUBSEQUENTLY EXTENDED.
    23     (B)  REPORTS.--WHENEVER THE AUTHORIZATION AND APPROPRIATION
    24  FOR THE ADDITIONAL CAPITAL PROJECTS ITEMIZED UNDER THIS ACT
    25  SHALL EXPIRE PURSUANT TO SUBSECTION (A), THE SECRETARY OF THE
    26  BUDGET SHALL, WITHIN 30 DAYS OF THE DATE OF EXPIRATION, PROVIDE
    27  TO THE CHAIRMAN AND MINORITY CHAIRMAN OF THE APPROPRIATIONS
    28  COMMITTEE OF THE SENATE AND THE CHAIRMAN AND MINORITY CHAIRMAN
    29  OF THE APPROPRIATIONS COMMITTEE OF THE HOUSE OF REPRESENTATIVES
    30  A REPORT ITEMIZING ALL CAPITAL PROJECTS WHICH HAVE EXPIRED. SUCH
    19990H1023B3629                 - 221 -

     1  REPORT SHALL CONTAIN SPECIFIC REFERENCES TO THE SECTION OF THE
     2  ACT WHEREIN THE PROJECTS WHERE ITEMIZED AND SHALL INCLUDE THE
     3  PROJECT LOCATION,PROJECT DESCRIPTION AND AUTHORIZED PROJECT
     4  AMOUNT. THE REPORT SHALL ALSO AGGREGATE THE TOTAL DOLLAR AMOUNT
     5  OF EXPIRED PROJECTS BY CAPITAL PROJECT CATEGORY.
     6  SECTION 24.  ALLOCATION OF FUNDS.
     7     WHENEVER AS DETERMINED BY THE DEPARTMENT OF TRANSPORTATION
     8  THAT THE FULL ESTIMATED FINANCIAL COSTS OF THE PROJECTS ITEMIZED
     9  IN SECTION 11 ARE NOT NECESSARY FOR THE PROPER DESIGN,
    10  ACQUISITION OR CONSTRUCTION OF SUCH PROJECTS, THE EXCESS FUNDS
    11  NO LONGER REQUIRED MAY BE ALLOCATED BY THE DEPARTMENT OF
    12  TRANSPORTATION TO INCREASE THE ESTIMATED COSTS OF ANY ONE OR
    13  MORE OF THE PROJECTS SPECIFICALLY ITEMIZED IN A CAPITAL BUDGET.
    14  SECTION 25.  RESTRICTION ON CERTAIN FUNDS.
    15     (A)  RESTRICTION FOR DGS-948-35.--THE NEW AND ADDITIONAL
    16  FUNDS PROVIDED FOR DGS-948-35, THE FIRE SAFETY CODE IMPROVEMENTS
    17  TO THE CAPITOL COMPLEX SPECIFICALLY RELATING TO THE CAPITOL
    18  BUILDING, ITEMIZED IN SECTION 4(6)(II)(E), SHALL ONLY BE
    19  DISBURSED UPON THE WRITTEN APPROVAL OF BOTH THE CHIEF CLERK OF
    20  THE SENATE AND THE CHIEF CLERK OF THE HOUSE OF REPRESENTATIVES.
    21  THE NEW AND ADDITIONAL FUNDS PROVIDED FOR DGS-948-35, THE FIRE
    22  SAFETY CODE IMPROVEMENTS RELATING TO THE NORTH OFFICE BUILDING,
    23  ITEMIZED IN SECTION 4(6)(II)(E), SHALL ONLY BE DISBURSED UPON
    24  THE WRITTEN APPROVAL OF THE CHIEF CLERK OF THE SENATE. THE NEW
    25  AND ADDITIONAL FUNDS PROVIDED FOR DGS-948-35, THE FIRE SAFETY
    26  CODE IMPROVEMENTS RELATING TO THE SOUTH OFFICE BUILDING,
    27  ITEMIZED IN SECTION 4(6)(II)(E), SHALL ONLY BE DISBURSED UPON
    28  THE WRITTEN APPROVAL OF THE CHIEF CLERK OF THE HOUSE OF
    29  REPRESENTATIVES.
    30     (B)  RESTRICTION ON CERTAIN FUNDS.--THE NEW AND ADDITIONAL
    19990H1023B3629                 - 222 -

     1  FUNDS PROVIDED IN SECTIONS 4(6)(I)(B), 5(3)(I)(A),
     2  14(A)(2)(I)(A) AND (B)(1)(I)(A), FOR THE COMMONWEALTH MAIL
     3  PROCESSING AND LEGISLATIVE SERVICES FACILITY, SHALL ONLY BE
     4  DISBURSED UPON THE WRITTEN APPROVAL OF THE CHIEF CLERK OF THE
     5  SENATE.
     6  SECTION 26.  REDEVELOPMENT ASSISTANCE CAPITAL PROJECTS.
     7     (A)  NOTWITHSTANDING ANY OTHER LAW TO THE CONTRARY, THE
     8  REQUIREMENTS OF SECTION 318 OF THE ACT OF FEBRUARY 9, 1999
     9  (P.L.1, NO.1), KNOWN AS THE CAPITAL FACILITIES DEBT ENABLING
    10  ACT, SHALL PROVIDE THE SOLE AND EXCLUSIVE REQUIREMENTS FOR
    11  BIDDING FOR THE ACQUISITION, DEVELOPMENT AND CONSTRUCTION OF THE
    12  REDEVELOPMENT ASSISTANCE CAPITAL PROJECT ITEMIZED IN SECTION
    13  7(23)(I)(A) OF THIS ACT.
    14     (B)  ANY PUBLIC AUTHORITY SHALL BE ELIGIBLE TO CONTRACT WITH
    15  THE COMMONWEALTH TO RECEIVE FUNDS FOR THE ACQUISITION,
    16  DEVELOPMENT AND CONSTRUCTION OF THE REDEVELOPMENT ASSISTANCE
    17  CAPITAL PROJECT ITEMIZED IN SECTION 7(23)(I)(A) OF THIS ACT.
    18     (C)  NOTHING IN THIS SECTION SHALL BE CONSTRUED TO OVERRIDE
    19  OR ABROGATE ANY PROVISIONS OF THE ACT OF MARCH 3, 1978 (P.L.6,
    20  NO.3), KNOWN AS THE STEEL PRODUCTS PROCUREMENT ACT.
    21  SECTION 27.  REPEALS.
    22     THE FOLLOWING ACTS AND PARTS OF ACTS ARE REPEALED:
    23     SECTIONS 3(13)(I)(B), (V)(A), (XI)(F), (XII)(J) AND
    24  (XIII)(A), 4(8)(X)(A) AND 7(1)(XVII)(A) OF THE ACT OF OCTOBER
    25  10, 1997 (P.L.392, NO.47), KNOWN AS THE CAPITAL BUDGET PROJECT
    26  ITEMIZATION ACT FOR 1996-1997.
    27     SECTIONS 3(7)(XX)(C) AND (12)(II)(B) AND 6(9)(VI)(A),
    28  (18)(I)(A) AND (23)(III)(A) OF THE ACT OF JUNE 25, 1999
    29  (P.L.237, NO.35), KNOWN AS THE CAPITAL BUDGET PROJECT
    30  ITEMIZATION ACT FOR 1999-2000.
    19990H1023B3629                 - 223 -

     1  SECTION 28.  EDITORIAL CHANGES.
     2     IN EDITING AND PREPARING THIS ACT FOR PRINTING FOLLOWING THE
     3  FINAL ENACTMENT, THE LEGISLATIVE REFERENCE BUREAU SHALL INSERT
     4  OR REVISE LETTERS OR NUMBERS FOR PROJECTS WHERE THE LETTERS OR
     5  NUMBERS ARE MISSING OR REQUIRE REVISION. THE BUREAU SHALL ALSO
     6  REVISE THE TOTAL MONETARY AMOUNTS FOR THE TOTAL AUTHORIZATION,
     7  DEBT AUTHORIZATION, APPROPRIATIONS AND DEPARTMENTAL TOTALS AS
     8  NECESSARY TO AGREE WITH THE TOTAL MONETARY AMOUNTS OF THE
     9  PROJECTS.
    10     SECTION 3.  SECTION 3 OF THE ACT IS AMENDED TO READ:
    11  SECTION 3.  EFFECTIVE DATE.
    12     THIS ACT SHALL TAKE EFFECT [JULY 1, 2000, OR IMMEDIATELY,
    13  WHICHEVER IS LATER] IMMEDIATELY.












    B8L72RZ/19990H1023B3629         - 224 -