                                     AN ACT

     1  Providing for the capital budget for the fiscal year 2007-2008;
     2     itemizing public improvement projects, furniture and
     3     equipment projects, transportation assistance projects,
     4     redevelopment assistance capital projects, flood control
     5     projects, Keystone Recreation, Park and Conservation Fund
     6     projects, Environmental Stewardship Fund projects, Motor
     7     License Fund projects, State forestry bridge projects,
     8     PENNSYLVANIA FISH AND BOAT COMMISSION PROJECTS, Manufacturing  <--
     9     Fund Projects and federally funded projects to be constructed
    10     or acquired or assisted by the Department of General
    11     Services, the Department of Community and Economic
    12     Development, the Department of Conservation and Natural
    13     Resources, the Department of Environmental Protection, THE     <--
    14     PENNSYLVANIA FISH AND BOAT COMMISSION and the Department of
    15     Transportation, together with their estimated financial
    16     costs; authorizing the incurring of debt without the approval
    17     of the electors for the purpose of financing the projects to
    18     be constructed, acquired or assisted by the Department of
    19     General Services, the Department of Community and Economic
    20     Development, the Department of Conservation and Natural
    21     Resources, the Department of Environmental Protection, THE     <--
    22     PENNSYLVANIA FISH AND BOAT COMMISSION or the Department of
    23     Transportation; stating the estimated useful life of the
    24     projects; providing an exemption; providing for limitation on
    25     certain capital projects, for special provisions for certain
    26     redevelopment assistance capital projects and for preemption
    27     of local ordinances for Department of Corrections projects;
    28     and making appropriations.

    29     The General Assembly of the Commonwealth of Pennsylvania

     1  hereby enacts as follows:
     2  Section 1.  Short title.
     3     This act shall be known and may be cited as the Capital
     4  Budget Project Itemization Act of 2007-2008.
     5  Section 2.  Total authorizations.
     6     (a)  Public improvements.--The total authorization for the
     7  additional capital projects in the category of public
     8  improvement projects itemized in section 3 and to be acquired or
     9  constructed by the Department of General Services, its
    10  successors or assigns and to be financed by the incurring of
    11  debt shall be $1,548,730,000 $3,723,177,000.                      <--
    12     (b)  Furniture and equipment.--The total authorization for
    13  the additional capital projects in the category of public
    14  improvement projects consisting of the acquisition of original
    15  movable furniture and equipment to complete public improvement
    16  projects itemized in section 4 and to be acquired by the
    17  Department of General Services, its successors or assigns and to
    18  be financed by the incurring of debt shall be $81,846,000         <--
    19  $136,346,000.                                                     <--
    20     (c)  Transportation assistance.--The total authorization for
    21  the capital projects in the category of transportation
    22  assistance projects itemized in section 5 with respect to which
    23  an interest is to be acquired in or constructed by the
    24  Department of Transportation, its successors or assigns and to
    25  be financed by the incurring of debt shall be $428,978,000        <--
    26  $671,739,000.                                                     <--
    27     (d)  Redevelopment assistance.--The total authorization for
    28  the additional capital projects in the category of redevelopment
    29  assistance and redevelopment assistance capital projects
    30  itemized in section 6 for capital grants by the Department of
    20070H1589B2829                  - 2 -     

     1  Community and Economic Development, its successors or assigns
     2  and to be financed by the incurring of debt shall be
     3  $1,847,616,000 $4,497,578,000.                                    <--
     4     (e)  Flood control.--The total authorization for the capital
     5  projects in the category of flood control projects itemized in
     6  section 7 and to be constructed by the Department of
     7  Environmental Protection, its successors or assigns, and to be
     8  financed by the incurring of debt, shall be $21,726,000           <--
     9  $39,226,000.                                                      <--
    10     (f)  Keystone Recreation, Park and Conservation Fund.--The
    11  total authorization for the capital projects in the category of
    12  public improvement projects itemized in section 8 and to be
    13  constructed by the Department of Conservation and Natural
    14  Resources, its successors or assigns and to be financed from
    15  current revenues in the Keystone Recreation, Park and
    16  Conservation Fund shall $28,613,000.
    17     (g)  Environmental Stewardship Fund projects.--The total
    18  authorization for the capital projects in the category of public
    19  improvement projects itemized in section 9 and to be constructed
    20  by the Department of Conservation and Natural Resources, its
    21  successors or assigns and to be financed from current revenues
    22  in the Environmental Stewardship Fund shall be $142,255,000.
    23     (h)  State forestry bridge projects.--The total authorization
    24  for the capital projects itemized in section 10 to be
    25  constructed by the Department of Conservation and Natural
    26  Resources, its successors or assigns and to be financed by oil
    27  company franchise tax revenues pursuant to 75 Pa.C.S. §
    28  9502(a)(2)(iv) (relating to imposition of tax) shall be
    29  $8,300,000.
    30     (i)  General Fund current revenue projects.--The total
    20070H1589B2829                  - 3 -     

     1  authorization for the capital projects in the category of public
     2  improvement projects itemized in section 11 and to be developed
     3  or constructed by the Department of General Services, its
     4  successors or assigns and to be financed from current revenues
     5  in the General Fund shall be $26,100,000 $29,600,000.             <--
     6     (J)  MANUFACTURING FUND CURRENT REVENUE PROJECTS.--THE TOTAL   <--
     7  AUTHORIZATION FOR THE CAPITAL PROJECTS IN THE CATEGORY OF PUBLIC
     8  IMPROVEMENT PROJECTS ITEMIZED IN SECTION 11.1 AND TO BE
     9  CONSTRUCTED BY THE DEPARTMENT OF GENERAL SERVICES, ITS
    10  SUCCESSORS OR ASSIGNS, AND TO BE FINANCED FROM CURRENT REVENUES
    11  IN THE MANUFACTURING FUND SHALL BE $3,000,000.
    12     (K)  FISH AND BOAT FUND PROJECTS.--THE TOTAL AUTHORIZATION     <--
    13  FOR THE CAPITAL PROJECTS IN THE CATEGORY OF PUBLIC IMPROVEMENT
    14  PROJECTS ITEMIZED IN SECTION 11.2 TO BE ACQUIRED OR DEVELOPED BY
    15  THE PENNSYLVANIA FISH AND BOAT COMMISSION AND TO BE FINANCED BY
    16  THE INCURRING OF DEBT OR BY CURRENT REVENUES OF THE FISH FUND
    17  AND THE BOAT FUND PURSUANT TO EXECUTIVE AUTHORIZATION SHALL BE
    18  $9,000,000.
    19     (j) (K)  Manufacturing Fund current revenue projects.--The     <--
    20  total authorization for the capital projects in the category of
    21  public improvement projects itemized in section 12 and to be
    22  constructed by the Department of General Services, its
    23  successors or assigns, and to be financed from current revenues
    24  in the Manufacturing Fund shall be $3,000,000.
    25  Section 3.  Itemization of public improvement capital projects.
    26     Additional capital projects in the category of public
    27  improvement projects to be constructed or acquired by the
    28  Department of General Services, its successors or assigns, and
    29  to be financed by the incurring of debt, are hereby itemized,
    30  together with their respective estimated financial costs, as
    20070H1589B2829                  - 4 -     

     1  follows:
     2                                                           Total
     3                                                          Project
     4             Project                                    Allocation
     5  (1)  Office of Administration
     6     (i)  Statewide mobile radio and microwave
     7         system
     8         (A)  Additional funds for DGS project 950-
     9             10, Statewide mobile radio and
    10             microwave system                           36,100,000
    11             (Base Project Allocation - $36,100,000)
    12  (2)  Department of Agriculture
    13     (i)  Health Diagnostic Laboratory
    14         (A)  Construct a new Pennsylvania Animal
    15             Health Diagnostic Laboratory (PADLS)
    16             with Bio-Safety Level-3 capabilities to
    17             support PADLS                              33,000,000
    18             (Base Project Allocation - $29,700,000)
    19             (Design and Contingencies - $3,300,000)
    20     (ii)  State Dairy Farm
    21         (A)  Rehabilitate and construct several
    22             support facilities for State dairy farm
    23             to complement existing dairy operation       500,000
    24             (Base Project Allocation - $450,000)
    25             (Design and Contingencies - $50,000)
    26     (iii)  Pennsylvania Fairs
    27         (A)  Pennsylvania Fairs matching funds          5,000,000
    28             (Base Project Allocation - $5,000,000)
    29     (IV)  DEPARTMENT HEADQUARTERS                                  <--
    30         (A)  SUPPLEMENTAL FUNDING TO PROJECT NO.
    20070H1589B2829                  - 5 -     

     1             700.43 TO COMPLETE UPGRADES, REPAIRS
     2             AND RENOVATIONS TO ORIGINAL ELECTRICAL,
     3             ROOFING AND MECHANICAL SYSTEMS              5,000,000
     4     (V)  STATE FARM ENHANCEMENT
     5         (A)  CONSTRUCTION AND RENOVATION OF STATE
     6             FARM SITE IN BERKS COUNTY                   5,000,000
     7         (B)  CONSTRUCTION AND RENOVATION OF STATE
     8             FARM SITE IN SNYDER COUNTY                  5,000,000
     9     (VI)  FARM SHOW COMPLEX
    10         (A)  AMENDING THE DESCRIPTION OF PROJECT
    11             NO. 700.41, PHASE III, ACT 1999-35          2,000,000
    12  (3)  Department of Conservation and Natural
    13     Resources
    14     (i)  Bald Eagle State Park
    15         (A)  Rehabilitate and develop a family
    16             campground at the State park including
    17             infrastructure                              2,000,000
    18             (Base Project Allocation - $2,000,000)
    19     (ii)  Chester County
    20         (A)  Acquire the Strawbridge Property lands
    21             in Chester County                           4,000,000
    22             (Land Allocation - $4,000,000)
    23     (iii)  Clear Creek State Park
    24         (A)  Construct new maintenance facility
    25             including infrastructure                    1,800,000
    26             (Base Project Allocation - $1,800,000)
    27     (iv)  Cook Forest State Park
    28         (A)  Replace the office/visitors' center        2,500,000
    29             (Base Project Allocation - $2,000,000)
    30             (Design and Contingencies - $500,000)
    20070H1589B2829                  - 6 -     

     1         (B)  Replace the pit latrines with modern
     2             flush facilities including
     3             infrastructure                              1,000,000
     4             (Base Project Allocation - $800,000)
     5             (Design and Contingencies - $200,000)
     6     (v)  Erie Bluffs State Park
     7         (A)  Provide for construction of the
     8             initial development of 540 acre area
     9             including infrastructure, roads,
    10             trails, parking lots and boating
    11             facilities                                 10,000,000
    12             (Base Project Allocation - $8,000,000)
    13             (Design and Contingencies - $2,000,000)
    14     (vi)  Forest District 3
    15         (A)  Rehabilitate and improve the Gunter
    16             Valley Dam to return it to a safe
    17             condition and in compliance with
    18             current requirements                        7,000,000
    19             (Base Project Allocation - $5,600,000)
    20             (Design and Contingencies - $1,400,000)
    21     (vii)  Forest District 4
    22         (A)  Repair and repave roads including
    23             returning a portion back to a gravel
    24             road                                        5,000,000
    25             (Base Project Allocation - $4,000,000)
    26             (Design and Contingencies - $1,000,000)
    27     (viii)  Forest District 7
    28         (A)  Rehabilitate roadways throughout the
    29             forest to ensure safety and to provide
    30             public access for outdoor activities        3,000,000
    20070H1589B2829                  - 7 -     

     1             (Base Project Allocation - $2,400,000)
     2             (Design and Contingencies - $600,000)
     3     (ix)  Forest District 9
     4         (A)  Rehabilitate roadways throughout the
     5             forest to ensure safety and to provide
     6             public access for outdoor activities        3,000,000
     7             (Base Project Allocation - $2,400,000)
     8             (Design and Contingencies - $600,000)
     9     (x)  Forest District 10
    10         (A)  Rehabilitate roadways throughout the
    11             forest to ensure safety and to provide
    12             public access for outdoor activities        3,000,000
    13             (Base Project Allocation - $2,400,000)
    14             (Design and Contingencies - $600,000)
    15     (xi)  Forest District 12
    16         (A)  Rehabilitate roadways throughout the
    17             forest to ensure safety and to provide
    18             public access for outdoor activities        3,000,000
    19             (Base Project Allocation - $2,400,000)
    20             (Design and Contingencies - $600,000)
    21     (xii)  Forest District 13
    22         (A)  Rehabilitate roadways throughout the
    23             forest to ensure safety and to provide
    24             public access for outdoor activities        3,000,000
    25             (Base Project Allocation - $2,400,000)
    26             (Design and Contingencies - $600,000)
    27     (xiii)  Forest District 15
    28         (A)  Rehabilitate roadways throughout the
    29             forest to ensure safety and to provide
    30             public access for outdoor activities        3,000,000
    20070H1589B2829                  - 8 -     

     1             (Base Project Allocation - $2,400,000)
     2             (Design and Contingencies - $600,000)
     3     (xiv)  Forest District 16
     4         (A)  Rehabilitate roadways throughout the
     5             forest to ensure safety and to provide
     6             public access for outdoor activities        3,000,000
     7             (Base Project Allocation - $2,400,000)
     8             (Design and Contingencies - $600,000)
     9     (xv)  Forest District 20
    10         (A)  Rehabilitate roadways throughout the
    11             forest to ensure safety and to provide
    12             public access for outdoor activities        3,000,000
    13             (Base Project Allocation - $2,400,000)
    14             (Design and Contingencies - $600,000)
    15         (B)  Rehabilitate rest facilities, parking
    16             lots and multiple use trails and
    17             refurbish living quarters as a
    18             departmental training facility with
    19             necessary equipment                         2,500,000
    20             (Base Project Allocation - $2,000,000)
    21             (Design and Contingencies - $500,000)
    22     (xvi)  Gouldsboro State Park
    23         (A)  Rehabilitate day use area and provide
    24             for the replacement of lifeguard
    25             building, bathhouse, boat rental
    26             building and comfort station including
    27             infrastructure                              2,500,000
    28             (Base Project Allocation - $2,000,000)
    29             (Design and Contingencies - $500,000)
    30     (XVI.1)  KINZUA BRIDGE STATE PARK                              <--
    20070H1589B2829                  - 9 -     

     1         (A)  RECONSTRUCTION OF THE KINZUA VIADUCT      42,000,000
     2     (xvii)  Lehigh Gorge State Park
     3         (A)  Provide for the acquisition of land
     4             necessary to complete the scheme for
     5             the park in conformance with Statewide
     6             recreation plan                             3,500,000
     7             (Land Allocation - $3,500,000)
     8     (xviii)  Montgomery County
     9         (A)  Acquire the Erdenheim Farm lands in
    10             Montgomery County                           4,000,000
    11             (Land Allocation -$4,000,000)
    12         (B)  ENGINEERING AND CONSTRUCTION OF                       <--
    13             CRESHEIM TRAIL BETWEEN VALLEY GREEN IN
    14             FAIRMONT PARK IN PHILADELPHIA AND FORT
    15             WASHINGTON STATE PARK                       2,500,000
    16     (xix)  Nescopeck State Park
    17         (A)  Develop day use area and provide for
    18             the development of recreational and
    19             educational facilities for day use          3,000,000
    20             (Base Project Allocation - $2,500,000)
    21             (Design and Contingencies - $500,000)
    22     (xx)  Promised Land State Park
    23         (A)  Rehabilitate and improve lower lake
    24             dam to return it to a safe condition
    25             and in compliance with current
    26             requirements                                3,500,000
    27             (Base Project Allocation - $2,800,000)
    28             (Design and Contingencies - $700,000)
    29         (B)  Rehabilitation to infrastructure             139,000
    30             (Base Project Allocation - $139,000)
    20070H1589B2829                 - 10 -     

     1     (xxi)  Quehanna Wild Area
     2         (A)  Provide for the remediation of land of
     3             radioactive materials within the
     4             Quehanna wild area at the former
     5             nuclear reactor site                        2,500,000
     6             (Base Project Allocation - $2,500,000)
     7         (B)  Facilitate the cleanup and reclamation
     8             of the Quehanna reactor site at
     9             Moshannon State Forest                      1,834,000
    10             (Base Project Allocation - $1,834,000)
    11     (xxii)  Ricketts Glen State Park
    12         (A)  Repair and repave roads including
    13             returning a portion back to a gravel
    14             road                                        3,500,000
    15             (Base Project Allocation - $2,800,000)
    16             (Design and Contingencies - $700,000)
    17     (xxiii)  S.B. Elliott State Park
    18         (A)  Additional funding to complete the
    19             visitors' center and overnight lodging
    20             including furnishings and equipment         3,500,000
    21             (Base Project Allocation - $3,500,000)
    22     (xxiv)  Shikellamy State Park
    23         (A)  Rehabilitate marina damaged by flood
    24             waters in 2005 and 2006 including new
    25             docks, railings, concrete bulkheads and
    26             courtesy docks                              1,500,000
    27             (Base Project Allocation - $1,200,000)
    28             (Design and Contingencies - $300,000)
    29  (4)  Department of Corrections
    30     (i)  State Correctional Institution at
    20070H1589B2829                 - 11 -     

     1         Cambridge Springs
     2         (A)  Construct a new 128-cell L-3 close
     3             security housing unit with 230-bed
     4             capacity with infrastructure upgrade       16,800,000  <--
     5             (Base Project Allocation - $13,500,000)
     6             (Design and Contingencies - $3,300,000)
     7             CAPACITY WITH INFRASTRUCTURE UPGRADE       17,800,000  <--
     8             (BASE PROJECT ALLOCATION - $14,800,000)
     9             (DESIGN AND CONTINGENCIES - $3,000,000)
    10     (ii)  State Correctional Institution at Camp
    11         Hill
    12         (A)  Additional funds for DGS project 573-
    13             26, replacement of Group 1 plumbing
    14             components                                  8,000,000
    15             (Base Project Allocation - $6,400,000)
    16             (Design and Contingencies - $1,600,000)
    17         (B)  Additional funds for DGS project 573-
    18             27, provide additional funding for
    19             Phase 2 to complete the plumbing
    20             repairs started under projects 573-27
    21             to include steam pipe replacement and
    22             repairs to pipe tunnels                     6,000,000
    23             (Base Project Allocation - $4,800,000)
    24             (Design and Contingencies - $1,200,000)
    25     (iii)  State Correctional Institution at Coal
    26         Township
    27         (A)  Construct a new 128-cell L-3 close
    28             security housing unit with 230-bed
    29             capacity with infrastructure upgrade       14,500,000  <--
    30             (Base Project Allocation - $11,600,000)
    20070H1589B2829                 - 12 -     

     1             (Design and Contingencies - $2,900,000)
     2             CAPACITY WITH INFRASTRUCTURE UPGRADE       15,500,000  <--
     3             (BASE PROJECT ALLOCATION - $12,900,000)
     4             (DESIGN AND CONTINGENCIES - $2,600,000)
     5     (iv)  State Correctional Institution at Cresson
     6         (A)  Renovate and upgrade the heating and
     7             air conditioning system serving the
     8             medical building                              550,000
     9             (Base Project Allocation - $440,000)
    10             (Design and Contingencies - $110,000)
    11     (v)  (Reserved)                                                <--
    12     (V)  STATE CORRECTIONAL INSTITUTION AT FAYETTE                 <--
    13         (A)  REPLACE HEATING AND COOLING
    14             DISTRIBUTION LINES                         10,500,000
    15             (BASE PROJECT ALLOCATION - $8,750,000)
    16             (DESIGN AND CONTINGENCIES - $1,750,000)
    17     (vi)  State Correctional Institution at Forest
    18         (A)  Construct a new 128-cell L-5 close
    19             security housing unit with capacity
    20             with infrastructure upgrade                16,500,000  <--
    21             (Base Project Allocation - $13,200,000)
    22             (Design and Contingencies - $3,300,000)
    23             WITH INFRASTRUCTURE UPGRADE                17,500,000  <--
    24             (BASE PROJECT ALLOCATION - $14,600,000)
    25             (DESIGN AND CONTINGENCIES - $2,900,000)
    26     (vii)  State Correctional Institution at
    27         Frackville
    28         (A)  Replace and upgrade the institution's
    29             main electrical switchgear                    520,000
    30             (Base Project Allocation - $416,000)
    20070H1589B2829                 - 13 -     

     1             (Design and Contingencies - $104,000)
     2         (B)  CONSTRUCT A NEW 2,000-BED L-3 MEDIUM                  <--
     3             SECURITY PRISON ON THE GROUNDS OF SCI
     4             FRACKVILLE, INCLUDING INFRASTRUCTURE
     5             AND ROAD WORK TO INCORPORATE THE TWO
     6             FACILITIES AT THIS SITE                   200,000,000
     7             (BASE PROJECT ALLOCATION -
     8             $160,000,000)
     9             (DESIGN AND CONTINGENCIES -
    10             $40,000,000)
    11     (viii)  State Correctional Institution at
    12         Graterford
    13         (A)  Construct a new 2,000 bed L-3 Medium
    14             Security prison on the grounds of SCI
    15             Graterford including infrastructure and
    16             road work to incorporate the two
    17             facilities at this site                   200,000,000
    18             (Base Project Allocation -
    19             $160,000,000)
    20             (Design and Contingencies -
    21             $40,000,000)
    22     (ix)  State Correctional Institution at
    23         Huntingdon
    24         (A)  Construct a new 2,000 bed L-3 Medium                  <--
    25             L-5 MAXIMUM Security prison on the                     <--
    26             grounds of SCI Huntingdon including
    27             infrastructure and road work to
    28             incorporate the two facilities at this
    29             site                                      200,000,000
    30             (Base Project Allocation -
    20070H1589B2829                 - 14 -     

     1             $160,000,000)
     2             (Design and Contingencies -
     3             $40,000,000)
     4     (x)  State Correctional Institution at Laurel
     5         Highlands
     6         (A)  Replace roofs on dietary building No.4
     7             and housing unit building C                   800,000
     8             (Base Project Allocation - $640,000)
     9             (Design and Contingencies - $160,000)
    10         (B)  Additional funds for DGS Project 376-
    11             5, construct a new 230-bed capacity
    12             facility and upgrade infrastructure and
    13             security                                    1,500,000  <--
    14             (Base Project Allocation - $1,200,000)
    15             (Design and Contingencies - $300,000)
    16             SECURITY                                    2,000,000  <--
    17             (BASE PROJECT ALLOCATION - $1,600,000)
    18             (DESIGN AND CONTINGENCIES - $400,000)
    19     (X.1)  STATE CORRECTIONAL INSTITUTION AT
    20         MAHANOY
    21         (A)  CONSTRUCT A NEW 2,000-BED L-3 MEDIUM
    22             SECURITY PRISON ON THE GROUNDS OF SCI
    23             MAHANOY, INCLUDING INFRASTRUCTURE AND
    24             ROAD WORK TO INCORPORATE THE TWO
    25             FACILITIES AT THIS SITE                   200,000,000
    26             (BASE PROJECT ALLOCATION -
    27             $160,000,000)
    28             (DESIGN AND CONTINGENCIES -
    29             $40,000,000)
    30     (xi)  State Correctional Institution at Mercer
    20070H1589B2829                 - 15 -     

     1         (A)  Replace roofs on medical building, M
     2             Block and G Block                             650,000
     3             (Base Project Allocation - $520,000)
     4             (Design and Contingencies - $130,000)
     5         (B)  Additional funds for DGS Project 1572-
     6             10, construct a new 230-bed capacity
     7             facility and upgrade infrastructure and
     8             security                                    4,000,000  <--
     9             (Base Project Allocation - $3,200,000)
    10             SECURITY                                    4,500,000  <--
    11             (BASE PROJECT ALLOCATION - $3,700,000)
    12             (Design and Contingencies - $800,000)
    13     (xii)  State Correctional Institution at Muncy
    14         (A)  Replace roofs on Administration
    15             building, Laundry building, Storeroom
    16             building, Kitchen building, and housing
    17             units A Block, M Block, K Block and F
    18             Block                                       2,300,000
    19             (Base Project Allocation - $1,840,000)
    20             (Design and Contingencies - $460,000)
    21         (B)  Additional funds for DGS Project 574-
    22             26, addition of two new cell blocks for
    23             close security, expansion of infirmary,
    24             outside warehouse, electrical and
    25             boiler upgrades; also including funds
    26             for utility upgrades and kitchen and
    27             dining room expansion                       7,200,000  <--
    28             (Base Project Allocation - $5,800,000)
    29             (Design and Contingencies - $1,400,000)
    30             DINING ROOM EXPANSION                       7,700,000  <--
    20070H1589B2829                 - 16 -     

     1             (BASE PROJECT ALLOCATION - $6,400,000)
     2             (DESIGN AND CONTINGENCIES - $1,300,000)
     3     (xiii)  State Correctional Institution at Pine
     4         Grove
     5         (A)  Construct a new 128-cell L-3 close
     6             security housing unit with 230-bed
     7             capacity with infrastructure upgrade       14,500,000  <--
     8             (Base Project Allocation - $11,600,000)
     9             (Design and Contingencies - $2,900,000)
    10             CAPACITY WITH INFRASTRUCTURE UPGRADE       15,500,000  <--
    11             (BASE PROJECT ALLOCATION - $12,900,000)
    12             (DESIGN AND CONTINGENCIES - $2,600,000)
    13     (xiv)  State Correctional Institution at
    14         Rockview
    15         (A)  Construct a new 2,000 bed L-3 Medium
    16             Security prison on the grounds of SCI
    17             Rockview including infrastructure and
    18             road work to complete the two
    19             facilities at this site                   200,000,000
    20             (Base Project Allocation -
    21             $160,000,000)
    22             (Design and Contingencies -
    23             $40,000,000)
    24     (xv)  State Correctional Institution at
    25         Smithfield
    26         (A)  Additional funds for DGS Project 1573-
    27             7, expand kitchen/dining facility           2,500,000
    28             (Base Project Allocation - $2,000,000)
    29             (Design and Contingencies - $500,000)
    30         (B)  Additional funds for DGS Project 1573-
    20070H1589B2829                 - 17 -     

     1             9, construct a new 230-bed capacity
     2             facility and upgrade infrastructure and
     3             security                                    4,000,000  <--
     4             (Base Project Allocation - $3,200,000)
     5             (Design and Contingencies - $800,000)
     6             SECURITY                                    5,000,000  <--
     7             (BASE PROJECT ALLOCATION - $4,100,000)
     8             (DESIGN AND CONTINGENCIES - $900,000)
     9     (xvi)  New State Correctional Institution in
    10         Luzerne County
    11         (A)  Construct a new 2,300-bed L-3 medium
    12             security prison within a five-mile
    13             radius of SCI Retreat. Includes
    14             construction of all other facilities as
    15             necessary to operate institution          200,000,000
    16             (Base Project Allocation -
    17             $160,000,000)
    18             (Design and Contingencies -
    19             $40,000,000)
    20     (XVII)  NEW STATE CORRECTIONAL INSTITUTION IN                  <--
    21         NORTHUMBERLAND COUNTY
    22         (A)  CONSTRUCT A NEW 2,000-BED L-3 MEDIUM
    23             SECURITY PRISON, INCLUDING ACQUISITION
    24             OF LAND, CONSTRUCTION OF INFRASTRUCTURE
    25             AND CONSTRUCTION OF ALL OTHER
    26             FACILITIES AS NECESSARY TO OPERATE THE
    27             INSTITUTION                               200,000,000
    28             (BASE PROJECT ALLOCATION -
    29             $160,000,000)
    30             (DESIGN AND CONTINGENCIES -
    20070H1589B2829                 - 18 -     

     1             $40,000,000)
     2     (xvii) (XVIII)  Corrections training rifle                     <--
     3         range and indoor hand gun range
     4         (A)  Construction of a corrections training
     5             rifle range and indoor hand gun range       2,000,000
     6             (Base Project Allocation - $2,000,000)
     7     (IX)  NEW STATE CORRECTIONAL INSTITUTION IN                    <--
     8         FAYETTE COUNTY
     9         (A)  CONSTRUCT A NEW 2,300-BED L-3 MEDIUM
    10             SECURITY PRISON, INCLUDING CONSTRUCTION
    11             OF ALL OTHER FACILITIES AS NECESSARY TO
    12             OPERATE INSTITUTION                       200,000,000
    13             (BASE PROJECT ALLOCATION -
    14             $160,000,000)
    15             (DESIGN AND CONTINGENCIES -
    16             $40,000,000)
    17  (5)  Department of Education
    18     (i)  Scranton State School for the Deaf
    19         (A)  Provide improvements and upgrades to
    20             the emergency, mechanical and
    21             electrical systems throughout the
    22             campus                                      7,560,000
    23             (Base Project Allocation - $6,574,000)
    24             (Design and Contingencies - $986,000)
    25     (ii)  Pennsylvania State University
    26         (A)  Provide for the capital renewal for
    27             campuses in the eastern region of the
    28             university including code compliances
    29             and infrastructure upgrades                 7,000,000
    30             (Base Project Allocation - $7,000,000)
    20070H1589B2829                 - 19 -     

     1         (B)  Provide for the capital renewal for
     2             campuses in the central region of the
     3             university including code compliances
     4             and infrastructure upgrades                 7,000,000
     5             (Base Project Allocation - $7,000,000)
     6         (C)  Provide for the capital renewal for
     7             campuses in the western region of the
     8             university including code compliances
     9             and infrastructure upgrades                 7,000,000
    10             (Base Project Allocation - $7,000,000)
    11         (D)  ALTOONA CAMPUS, ENGINEERING AND                       <--
    12             RESEARCH AND EXTENSION BUILDING            30,000,000
    13         (E)  DUBOIS CAMPUS, ENGINEERING RESEARCH
    14             AND EXTENSION BUILDING                     30,000,000
    15         (F)  UNIVERSITY PARK, ENGINEERING
    16             ADMINISTRATION, RESEARCH AND EXTENSION
    17             BUILDING                                   80,000,000
    18         (G)  CAPITAL RENEWAL, PHASE II, EASTERN
    19             REGION                                     14,000,000
    20         (H)  CAPITAL RENEWAL, PHASE II, CENTRAL
    21             REGION                                     14,000,000
    22         (I)  CAPITAL RENEWAL, PHASE II, WESTERN
    23             REGION                                     14,000,000
    24         (J)  CAPITAL RENEWAL, PHASE IV AT
    25             UNIVERSITY PARK                            40,000,000
    26         (K)  RENOVATION, REHABILITATION AND
    27             CONSTRUCTION COSTS FOR A CHEMICAL
    28             ENGINEERING BUILDING                       51,700,000
    29     (iii)  University of Pennsylvania
    30         (A)  Construction of a Center for
    20070H1589B2829                 - 20 -     

     1             Nanotechnology Research and
     2             Development                                30,000,000
     3             (Base Project Allocation - $30,000,000)
     4         (B)  Construction of a new Life Sciences
     5             Building                                   16,000,000
     6             (Base Project Allocation - $16,000,000)
     7     (iv)  University of Pittsburgh
     8         (A)  Providing for upgrades and deferred
     9             maintenance needs on all campuses          20,000,000
    10             (Base Project Allocation - $16,667,000)
    11             (Design and Contingencies - $3,333,000)
    12         (B)  Construction and other related costs
    13             for the renovation of the Manufacturing
    14             Assistance Center                             375,000
    15         (C)  ADDITIONAL FUNDS FOR DGS PROJECT NO.                  <--
    16             1103-385, CONSTRUCTION OF SALK HALL
    17             ADDITION                                   30,000,000
    18         (D)  RENOVATIONS AND ADDITION TO CHEVRON
    19             SCIENCE CENTER                             25,000,000
    20         (E)  PROGRAMMATIC RENOVATIONS, PHASE II,
    21             ALL CAMPUSES                               20,000,000
    22     (v)  Lincoln University
    23         (A)  Renovate Langston Hughes Library and                  <--
    24             correct problems from structural design
    25             flaws                                       7,000,000
    26             (Base Project Allocation - $5,600,000)
    27             (Design and Contingencies - $1,400,000)
    28         (B)  Renovate Wright Hall building systems,
    29             classrooms and laboratory including ADA
    30             requirements                                4,000,000
    20070H1589B2829                 - 21 -     

     1             (Base Project Allocation - $3,200,000)
     2             (Design and Contingencies - $800,000)
     3         (A)  ADDITIONAL FUNDS TO RENOVATE LANGSTON                 <--
     4             HUGHES LIBRARY AND CORRECT PROBLEMS
     5             FROM STRUCTURAL DESIGN FLAWS,
     6             CONTINUATION OF DGS PROJECT NO. 1101-
     7             44                                          7,000,000
     8             (BASE PROJECT ALLOCATION - $5,600,000)
     9             (DESIGN AND CONTINGENCIES - $1,400,000)
    10         (B)  ADDITIONAL FUNDS FOR COMPLETION OF
    11             RENOVATION OF WRIGHT HALL BUILDING
    12             SYSTEMS, CLASSROOMS AND LABORATORY,
    13             INCLUDING ADA REQUIREMENTS FOR DGS
    14             PROJECT NO. 1101-43                         4,000,000
    15             (BASE PROJECT ALLOCATION - $3,200,000)
    16             (DESIGN AND CONTINGENCIES - $800,000)
    17         (C)  ADDITIONAL FUNDS FOR LANDSCAPING,
    18             SIDEWALKS AND OTHER PROJECTS, PHASE II,
    19             DGS PROJECT NO. 1101-45                    15,000,000
    20         (D)  ADDITIONAL FUNDS FOR DGS PROJECT NO.
    21             1101-28A AND EMERGENCY GENERATORS           1,800,000
    22     (V.1)  LEHIGH CARBON COMMUNITY COLLEGE
    23         (A)  CONSTRUCTION OF FOUR ATHLETIC FIELDS       2,200,000
    24     (V.2)  COMMUNITY COLLEGE OF ALLEGHENY COUNTY
    25         (A)  CONSTRUCTION OF SCIENCE CENTER            14,500,000
    26     (vi)  Luzerne County Community College
    27         (A)  Construction, infrastructure and other
    28             related costs for a public safety
    29             institute                                   1,000,000
    30         (B)  Acquisition, construction,
    20070H1589B2829                 - 22 -     

     1             infrastructure and other related costs
     2             for student housing                         2,000,000
     3         (C)  Acquisition, construction,
     4             infrastructure and other related costs
     5             for a new culinary arts building with
     6             parking                                     3,000,000
     7         (D)  CONSTRUCTION AND RELATED COSTS FOR THE                <--
     8             KANJORSKI BUILDING HEALTH SCIENCES
     9             CENTER AT LUZERNE COMMUNITY COLLEGE         2,352,000
    10     (vii)  Northampton Community College
    11         (A)  Monroe Campus, construction of new
    12             campus to increase the availability of
    13             academic square footage                    44,000,000
    14             (Base Project Allocation - $44,000,000)
    15         (B)  NORTHAMPTON CAMPUS, RENOVATIONS AND                   <--
    16             INFRASTRUCTURE IMPROVEMENTS TO THE
    17             BOILER AND COOLING TOWERS                     500,000
    18         (C)  NORTHAMPTON CAMPUS, RENOVATIONS AND
    19             EXPANSION OF THE AUTOMOTIVE TECHNOLOGY
    20             PROGRAM FACILITY                            1,000,000
    21         (D)  FOWLER FAMILY SOUTHSIDE CENTER
    22             RENOVATIONS                                 1,000,000
    23     (viii)  Montgomery County Community College
    24         (A)  Construction, infrastructure and other
    25             related costs to expand the Science
    26             Center                                        750,000
    27             (Base Project Allocation - $750,000)
    28         (B)  ROOF REPLACEMENT ON 101 COLLEGE DRIVE                 <--
    29             BUILDING                                      500,000
    30         (C)  EXTERIOR DOOR REPLACEMENTS ON CENTRAL
    20070H1589B2829                 - 23 -     

     1             CAMPUS FACILITIES                             135,000
     2         (D)  CONSTRUCTION OF A WALKWAY AROUND THE
     3             PERIMETER OF CENTRAL CAMPUS                   323,000
     4         (E)  RENOVATIONS AND OTHER RELATED COSTS
     5             FOR THE RELOCATION AND EXPANSION OF THE
     6             THEATER FACILITY                              400,000
     7     (VIII.1)  COMMUNITY COLLEGE OF PHILADELPHIA
     8         (A)  CONSTRUCTION AND EXPANSION OF THE
     9             NORTHEAST PHILADELPHIA REGIONAL CENTER     10,100,000
    10     (VIII.2)  READING AREA COMMUNITY COLLEGE
    11         (A)  INFRASTRUCTURE IMPROVEMENTS AND
    12             CONSTRUCTION OF READING AREA COMMUNITY
    13             COLLEGE ACADEMIC CLASSROOM
    14             INSTRUCTIONAL CENTER                       20,000,000
    15     (VIII.3)  TEMPLE UNIVERSITY
    16         (A)  DESIGN AND CONSTRUCTION OF A RESEARCH,
    17             LABORATORY AND OFFICE BUILDING            100,000,000
    18     (ix)  Thaddeus Stevens College of Technology
    19         (A)  Construction and other related costs
    20             for the Thaddeus Stevens Technology
    21             Center                                      4,000,000
    22     (x)  Westmoreland Community College
    23         (A)  Construction and other related costs
    24             for Alle-Kiski Education Center             2,500,000
    25         (B)  INFRASTRUCTURE, CONSTRUCTION AND OTHER                <--
    26             RELATED COSTS FOR THE CONSTRUCTION OF A
    27             WORKFORCE AND ECONOMIC DEVELOPMENT
    28             TRAINING CENTER, LOCATED IN NEW
    29             KENSINGTON                                  3,700,000
    30         (C)  INFRASTRUCTURE, CONSTRUCTION AND OTHER
    20070H1589B2829                 - 24 -     

     1             RELATED COSTS FOR THE CONSTRUCTION OF A
     2             WORKFORCE AND ECONOMIC DEVELOPMENT
     3             TRAINING CENTER, LOCATED IN YOUNGWOOD       3,700,000
     4         (D)  INFRASTRUCTURE, CONSTRUCTION AND OTHER
     5             COSTS RELATED TO THE EXPANSION OF THE
     6             PUBLIC SAFETY TRAINING CENTER               3,750,000
     7     (xi)  York Community College
     8         (A)  Acquisition, construction,
     9             infrastructure and other related costs
    10             for downtown York Community College
    11             campus                                      7,000,000
    12     (XII)  BUCKS COUNTY COMMUNITY COLLEGE                          <--
    13         (A)  RENOVATIONS AND ADA ACCESSIBILITY
    14             IMPROVEMENTS TO A GYMNASIUM                 1,000,000
    15         (B)  RENOVATIONS AND UPGRADES TO THE
    16             ROLLINS STUDENT CENTER                      1,351,000
    17         (C)  CONSTRUCTION OF A CLASSROOM AND
    18             FACULTY OFFICE BUILDING                     8,000,000
    19  (6)  Department of Environmental Protection
    20     (I)  BLAIR COUNTY                                              <--
    21         (A)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
    22             RELATED COSTS FOR THE MILL RUN
    23             REHABILITATION PROJECT                         76,000
    24     (i) (II)  Bucks County                                         <--
    25         (A)  Construction, infrastructure and other
    26             related costs for Bristol Borough flood
    27             protection project                          3,000,000
    28         (B)  CONSTRUCTION, INFRASTRUCTURE AND OTHER                <--
    29             RELATED COSTS FOR THE FLOOD CONTROL AND
    30             PROTECTION PROJECT IN THE NEWPORTVILLE
    20070H1589B2829                 - 25 -     

     1             SECTION OF BRISTOL TOWNSHIP                 1,000,000
     2     (ii) (III)  Cambria County                                     <--
     3         (A)  Additional funds for Patton Flood                     <--
     4             Project to the upstream section and
     5             remove existing levee in the downstream
     6             section                                     3,600,000
     7             (Base Project Allocation - $3,000,000)
     8             (Design and Contingencies - $600,000)
     9         (A)  ADDITIONAL FUNDS FOR REHABILITATION OF                <--
    10             THE PATTON FLOOD PROTECTION PROJECT IN
    11             THE BOROUGH OF PATTON                       4,800,000
    12             (BASE PROJECT ALLOCATION - $4,000,000)
    13             (DESIGN AND CONTINGENCIES - $800,000)
    14         (B)  Construct Lancashire No.15 acid mine
    15             drainage treatment plant to improve an
    16             estimated 25 miles of the west branch
    17             of the Susquehanna River                   10,025,000
    18             (Base Project Allocation - $10,025,000)
    19     (IV)  CHESTER COUNTY                                           <--
    20         (A)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
    21             RELATED COSTS FOR THE BUSINESS 30 FLOOD
    22             CONTROL PROJECT                               900,000
    23     (iii) (V)  Clearfield County                                   <--
    24         (A)  Construction and other related costs
    25             for stream channel clearing and
    26             restoration in Curwensville Borough         5,000,000
    27     (iv) (VI)  Clearfield and/or Cambria County                    <--
    28         (A)  Construct active acid mine drainage
    29             facility for currently untreated mine
    30             pool discharge in the Susquehanna River
    20070H1589B2829                 - 26 -     

     1             basin to offset agricultural
     2             consumptive use demands                     6,000,000
     3             (Base Project Allocation - $6,000,000)
     4     (v) (VII)  Clearfield and Elk Counties                         <--
     5         (A)  Construct active acid mine drainage
     6             facility near the Village of Hollywood,
     7             Huston Township, Clearfield County, to
     8             restore water quality in the Bennett
     9             Branch Sinnemahoning Creek in support
    10             of the PA Wilds initiative                 12,125,000
    11             (Base Project Allocation - $12,125,000)
    12     (VIII)  CLINTON COUNTY                                         <--
    13         (A)  CHATHAM RUN FLOOD PROTECTION,
    14             INCLUDING REPAIRS TO LEVEES ALONG
    15             CHATHAM RUN THROUGH PINE CREEK IN PINE
    16             CREEK TOWNSHIP                              7,500,000
    17     (VIII.1)  COLUMBIA COUNTY
    18         (A)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
    19             RELATED COSTS FOR FISHING CREEK FLOOD
    20             CONTROL PROJECT, INCLUDING GRAVEL BAR
    21             REMOVAL                                     1,000,000
    22     (vi) (IX)  Delaware County                                     <--
    23         (A)  Construction, infrastructure and other
    24             related costs for Edgemount Square in
    25             Newtown Township - stormwater
    26             management project                            300,000
    27         (B)  Construction, infrastructure and other
    28             related costs for the Radnor Middle
    29             School stormwater management project          300,000
    30         (C)  Construction, infrastructure and other
    20070H1589B2829                 - 27 -     

     1             related costs for stormwater management
     2             in Ridley Township                            500,000
     3     (vii) (X)  Fulton County                                       <--
     4         (A)  Reconstruct two streams currently
     5             flowing into abandoned surface mine
     6             pits in order to restore the natural
     7             stream flow to the Great Trough Creek       2,000,000
     8             (Base Project Allocation - $2,000,000)
     9     (viii) (XI)  Greene County                                     <--
    10         (A)  Construction, infrastructure and other
    11             related costs for Wisecarver Dam
    12             rehabilitation in Franklin Township         1,500,000
    13     (ix) (XII)  Indiana County                                     <--
    14         (A)  Construct active acid mine drainage
    15             facility near the abandoned Wehrum
    16             shaft to treat discharges from two
    17             abandoned mine complexes discharging to
    18             Blacklick Creek                             6,000,000
    19             (Base Project Allocation - $6,000,000)
    20     (x) (XIII)  Luzerne County                                     <--
    21         (A)  Additional funds for DGS Project 184-                 <--
    22             23, flood control project on Mill
    23             Creek, Avoca Borough                        1,200,000
    24             (Base Project Allocation - $1,000,000)
    25             (Design and Contingencies - $200,000)
    26         (B)  Construction and other costs related
    27             to repair and improve Wade Run in
    28             Swoyersville Borough                          500,000
    29         (C)  Construction, infrastructure and other
    30             related costs for the Ashley Solomon
    20070H1589B2829                 - 28 -     

     1             Creek Tunnel Project                          750,000
     2     (xi)  Montgomery County
     3         (A)  Construction and other related costs
     4             for the Ardsley Drainage Project in
     5             upper Dublin Township                       2,000,000
     6         (A)  ADDITIONAL FUNDS FOR DGS PROJECT 184-                 <--
     7             23 MILL CREEK FLOOD PROTECTION PROJECT
     8             IN AVOCA AND DUPONT BOROUGHS                6,000,000
     9             (BASE PROJECT ALLOCATION - $5,000,000)
    10             (DESIGN AND CONTINGENCIES - $1,000,000)
    11         (B)  REHABILITATION OF DGS PROJECT 180-37
    12             WADE RUN STREAM IMPROVEMENT PROJECT IN
    13             THE BOROUGH OF SWOYERSVILLE                 1,200,000
    14             (BASE PROJECT ALLOCATION - $1,000,000)
    15             (DESIGN AND CONTINGENCIES - $200,000)
    16     (XIV)  LYCOMING COUNTY
    17         (A)  DESIGN, INFRASTRUCTURE AND
    18             CONSTRUCTION OF COST-EFFECTIVE AND
    19             AFFORDABLE FLOOD PROTECTION MEASURES
    20             ALONG THE LOYALSOCK CREEK WITHIN THE
    21             BOROUGH OF MONTOURSVILLE                    7,500,000
    22         (B)  DESIGN, INFRASTRUCTURE AND
    23             CONSTRUCTION OF FLOOD MITIGATION
    24             PROTECTION MEASURES ALONG THE LYCOMING
    25             CREEK WITHIN OLD LYCOMING, LYCOMING AND
    26             LOYALSOCK TOWNSHIPS                        11,000,000
    27     (XV)  MCKEAN COUNTY
    28         (A)  CONSTRUCTION OF A FLOOD MITIGATION
    29             PROJECT ON THE ALLEGHENY RIVER IN THE
    30             BOROUGH OF PORT ALLEGANY                    1,000,000
    20070H1589B2829                 - 29 -     

     1     (XVI)  MONROE COUNTY
     2         (A)  INFRASTRUCTURE IMPROVEMENTS AND
     3             CONSTRUCTION FOR DIKE AT LAIRD
     4             TECHNOLOGIES BUILDING, DELAWARE WATER
     5             GAP                                         6,000,000
     6     (XVII)  MONTGOMERY COUNTY
     7         (A)  ADDITIONAL FUNDS FOR DGS PROJECT 181-
     8             5, CONSTRUCTION AND OTHER RELATED COSTS
     9             FOR ARDSLEY DRAINAGE PROJECT IN UPPER
    10             DUBLIN TOWNSHIP                             2,400,000
    11             (BASE PROJECT ALLOCATION - $2,000,000)
    12             (DESIGN AND CONTINGENCIES - $400,000)
    13     (XVIII)  NORTHAMPTON COUNTY
    14         (A)  REPAIR AND RESTORATION OF SOUTH
    15             BETHLEHEM FLOOD CONTROL SYSTEM                500,000
    16     (XIX)  NORTHUMBERLAND COUNTY
    17         (A)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
    18             RELATED COSTS FOR THE SUSQUEHANNA RIVER
    19             CLEARING AND GRUBBING PROJECT                 200,000
    20         (B)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
    21             RELATED COSTS FOR THE REAGAN STREET
    22             UNDERPASS FLOOD ABATEMENT PROJECT           2,200,000
    23     (XX)  SOMERSET COUNTY
    24         (A)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
    25             RELATED COSTS FOR THE EAST MAIN STREET
    26             FLOOD PROTECTION PROJECT                    5,000,000
    27     (XXI)  WAYNE COUNTY
    28         (A)  SURVEY AND ANALYZE EXISTING RIDGE AND
    29             TERRACE STORMWATER SYSTEM AND DEVELOP
    30             ALTERNATIVE STORMWATER CONCEPTS                60,000
    20070H1589B2829                 - 30 -     

     1     (XXII)  WESTMORELAND COUNTY
     2         (A)  ADDITIONAL FUNDS FOR DGS PROJECT NO.
     3             180-43, NORTHMONT STREET AREA FLOOD
     4             PROTECTION PROJECT IN THE CITY OF
     5             GREENSBURG                                  3,600,000
     6  (7)  Department of General Services
     7     (I)  BUCKS COUNTY                                              <--
     8         (A)  DESIGN AND CONSTRUCTION OF A MULTI-
     9             AGENCY EMERGENCY OPERATIONS CENTER         35,000,000
    10             (BASE PROJECT ALLOCATION - $28,000,000)
    11             (DESIGN AND CONTINGENCIES - $7,000,000)
    12     (i) (II)  Dauphin County                                       <--
    13         (A)  Provide for steam plant replacements
    14             and upgrades in Capitol Annex               1,563,000
    15             (Base Project Allocation - $1,250,000)
    16             (Design and Contingencies - $313,000)
    17         (B)  Provide for remediation of mold,
    18             asbestos and other hazmat in buildings
    19             and equipment areas in Capitol Annex        5,625,000
    20             (Base Project Allocation - $4,500,000)
    21             (Design and Contingencies - $1,125,000)
    22         (C)  Upgrade building heating system and
    23             install new air conditioning system in
    24             Capitol Annex                               3,750,000
    25             (Base Project Allocation - $3,000,000)
    26             (Design and Contingencies - $750,000)
    27         (D)  Replace main Capitol Complex
    28             Substation switchgears including
    29             control status board along with
    30             transformers and circuit breakers          25,000,000
    20070H1589B2829                 - 31 -     

     1             (Base Project Allocation - $20,000,000)
     2             (Design and Contingencies - $5,000,000)
     3         (E)  Replace existing 15kv distribution
     4             feeders throughout the Capitol Complex
     5             and reset the system primary and
     6             secondary circuit breakers for proper
     7             overall system coordination                10,625,000
     8             (Base Project Allocation - $8,500,000)
     9             (Design and Contingencies - $2,125,000)
    10         (F)  Refurbish Capital Park by providing
    11             for a new retaining wall along Walnut
    12             Street including new grading and
    13             installation of a water conduction
    14             system                                      1,000,000
    15             (Base Project Allocation - $750,000)
    16             (Design and Contingencies - $250,000)
    17         (G)  Replace all cloth ceilings in halls of
    18             the Capitol East Wing                       1,000,000
    19             (Base Project Allocation - $750,000)
    20             (Design and Contingencies - $250,000)
    21         (H)  Replace existing macadam with new
    22             covering and sealant to prevent water
    23             leakage and replace drains and piping
    24             at the parking facility at 22nd and
    25             Forster Streets, Harrisburg                 1,100,000
    26             (Base Project Allocation - $880,000)
    27             (Design and Contingencies - $220,000)
    28         (I)  Repair the roof membrane and replace
    29             broken pavers at the Rachel Carson
    30             State Office Building                         750,000
    20070H1589B2829                 - 32 -     

     1             (Base Project Allocation - $600,000)
     2             (Design and Contingencies - $150,000)
     3         (J)  PROVIDE FOR A CAPITOL COMPLEX -                       <--
     4             CAPITAL REHABILITATION AND IMPROVEMENTS
     5             PROGRAM                                    25,000,000
     6             (BASE PROJECT ALLOCATION - $20,000,000)
     7             (DESIGN AND CONTINGENCIES - $5,000,000)
     8         (K)  DESIGN AND CONSTRUCTION OF A MULTI-
     9             AGENCY EMERGENCY OPERATIONS CENTER         35,000,000
    10             (BASE PROJECT ALLOCATION - $28,000,000)
    11             (DESIGN AND CONTINGENCIES - $7,000,000)
    12     (III)  LEBANON COUNTY
    13         (A)  DESIGN AND CONSTRUCTION OF A MULTI-
    14             AGENCY EMERGENCY OPERATIONS CENTER         35,000,000
    15             (BASE PROJECT ALLOCATION - $28,000,000)
    16             (DESIGN AND CONTINGENCIES - $7,000,000)
    17     (IV)  PHILADELPHIA COUNTY
    18         (A)  DEVELOPMENT AND CONSTRUCTION OF THE
    19             MILL CREEK COMMUNITY CENTER                12,000,000
    20         (B)  DEMOLITION AND ABATEMENT COSTS
    21             ASSOCIATED WITH THE PASCHALL HOMES
    22             REDEVELOPMENT PROJECT                       8,600,000
    23         (C)  ENGINEERING RESEARCH AND EXTENSION
    24             BUILDING                                   30,000,000
    25         (D)  INFRASTRUCTURE IMPROVEMENTS FOR THE
    26             FORMER LIDDONFIELD HOMES AT TORRESDALE
    27             AVENUE AND JACKSON PLACE                   10,000,000
    28         (E)  ACQUISITION OF SITE, DESIGN,
    29             CONSTRUCTION, INFRASTRUCTURE AND OTHER
    30             RELATED COSTS FOR THE FIRST JUDICIAL
    20070H1589B2829                 - 33 -     

     1             DISTRICT FAMILY COURT BUILDING            200,000,000
     2  (8)  Pennsylvania Historical and Museum Commission
     3     (i)  Daniel Boone Homestead
     4         (A)  Provide for site improvements and
     5             restore the boyhood home of Daniel
     6             Boone                                         960,000
     7             (Base Project Allocation - $800,000)
     8             (Design and Contingencies - $160,000)
     9     (ii)  Landis Valley Museum
    10         (A)  Provide for the design and
    11             construction of a new maintenance
    12             building                                      960,000
    13             (Base Project Allocation - $800,000)
    14             (Design and Contingencies - $160,000)
    15     (iii)  Pennsbury Manor
    16         (A)  Rehabilitate up to 23 buildings and
    17             site development of infrastructure
    18             throughout the site                         1,920,000
    19             (Base Project Allocation - $1,600,000)
    20             (Design and Contingencies - $320,000)
    21     (iv)  Pennsylvania Lumber Museum
    22         (A)  Reconfigure entrance to the building
    23             to permit one coordinated exhibit
    24             gallery rather than two disjointed
    25             galleries                                   2,400,000
    26             (Base Project Allocation - $2,000,000)
    27             (Design and Contingencies - $400,000)
    28  (9)  Department of Military and Veterans Affairs
    29     (i)  Pittsburgh Hunt Readiness Center,
    30         Allegheny County
    20070H1589B2829                 - 34 -     

     1         (A)  Rehabilitate readiness center
     2             including assembly hall, classrooms,
     3             administrative offices, storage spaces,
     4             restrooms, locker rooms and mechanical
     5             rooms                                       3,000,000
     6             (Base Project Allocation - $2,400,000)
     7             (Design and Contingencies - $600,000)
     8     (ii)  Southwestern Veterans Center, Allegheny
     9         County
    10         (A)  Replace sewer main                           331,000
    11             (Base Project Allocation - $248,000)
    12             (Design and Contingencies - $83,000)
    13     (iii)  Hollidaysburg Veterans Home, Blair
    14         County
    15         (A)  Rehabilitate fire alarm and sprinkler
    16             systems in Arnold, Dietary, Eisenhower
    17             and MacArthur Halls to meet life safety
    18             compliance                                  2,722,000
    19             (Base Project Allocation - $2,268,000)
    20             (Design and Contingencies - $454,000)
    21     (iv)  Harrisburg Military Post, Dauphin County
    22         (A)  Rehabilitate various buildings and
    23             facilities on the military post
    24             including assembly halls, classrooms,
    25             administrative offices, storage spaces,
    26             restrooms, locker rooms, mechanical
    27             rooms and expanded parking                  6,000,000
    28             (Base Project Allocation - $4,800,000)
    29             (Design and Contingencies - $1,200,000)
    30     (v)  Wilkes-Barre Readiness Center, Luzerne
    20070H1589B2829                 - 35 -     

     1         County
     2         (A)  Rehabilitate readiness center
     3             including assembly hall, classrooms,
     4             administrative offices, storage spaces,
     5             restrooms, locker rooms, mechanical
     6             rooms and rehabilitation and expansion
     7             of parking                                  4,000,000
     8             (Base Project Allocation - $3,200,000)
     9             (Design and Contingencies - $800,000)
    10     (VI)  HERMITAGE READINESS CENTER, MERCER COUNTY                <--
    11         (A)  ADDITIONAL FUNDING TO SUPPORT
    12             CONSTRUCTION OF NEW PENNSYLVANIA
    13             NATIONAL GUARD READINESS CENTER (DGS
    14             PROJECT 963-16)                               750,000
    15             (BASE PROJECT ALLOCATION - $605,000)
    16             (DESIGN AND CONTINGENCIES - $145,000)
    17     (vi) (VII)  Southeastern Veterans Center,                      <--
    18         Montgomery County
    19         (A)  Rehabilitate fire alarm and sprinkler
    20             systems to meet life safety compliance      1,276,000
    21             (Base Project Allocation - $1,063,000)
    22             (Design and Contingencies - $213,000)
    23     (VIII)  EASTON READINESS CENTER, NORTHAMPTON                   <--
    24         COUNTY
    25         (A)  ADDITIONAL FUNDING TO SUPPORT
    26             CONSTRUCTION OF NEW PENNSYLVANIA
    27             NATIONAL GUARD READINESS CENTER (DGS
    28             PROJECT 961-9)                                800,000
    29             (BASE PROJECT ALLOCATION - $600,000)
    30             (DESIGN AND CONTINGENCIES - $200,000)
    20070H1589B2829                 - 36 -     

     1     (vii) (IX)  Philadelphia Lancaster Avenue                      <--
     2         Readiness Center, Philadelphia County
     3         (A)  Rehabilitate readiness center to
     4             include assembly hall, classrooms,
     5             administrative offices, storage spaces,
     6             restrooms, locker rooms and mechanical
     7             rooms                                       6,000,000
     8             (Base Project Allocation - $5,000,000)
     9             (Design and Contingencies - $1,000,000)
    10     (viii) (X)  Philadelphia Southampton Road                      <--
    11         Armory, Philadelphia County
    12         (A)  Replace several air handling units and
    13             associated pumps and motors and install
    14             new chiller with ice storage capacity
    15             to be made at night that will
    16             distribute cooling during the day           1,500,000
    17             (Base Project Allocation - $1,300,000)
    18             (Design and Contingencies - $200,000)
    19     (ix)  Keystone Lodge, Lebanon County                           <--
    20         (A)  Construction, infrastructure and other
    21             related costs                               1,300,000
    22     (XI)  SOUTHEASTERN VETERANS CENTER, CHESTER                    <--
    23         COUNTY
    24         (A)  ADDITIONAL FUNDS FOR DGS PROJECT 960-
    25             55                                          6,000,000
    26  (10)  Department of Public Welfare
    27     (i)  Allentown State Hospital
    28         (A)  Upgrade three coal boilers currently
    29             in poor condition and replace traveling
    30             grate stokers and controls                  3,600,000
    20070H1589B2829                 - 37 -     

     1             (Base Project Allocation - $3,000,000)
     2             (Design and Contingencies - $600,000)
     3     (ii)  Clarks Summit State Hospital
     4         (A)  Replace the electrical distribution
     5             center at the sewage treatment plant
     6             and install new 400 amp service, motor
     7             control center, new transformer and new
     8             back-up supply                              1,200,000
     9             (Base Project Allocation - $1,000,000)
    10             (Design and Contingencies - $200,000)
    11     (iii)  Ebensburg Center
    12         (A)  Replace all roofed areas which cover
    13             residential housing units                   1,440,000
    14             (Base Project Allocation - $1,200,000)
    15             (Design and Contingencies - $240,000)
    16         (B)  Replace current emergency generators
    17             with stand alone outside units in all
    18             seven residential units                     1,500,000
    19             (Base Project Allocation - $1,250,000)
    20             (Design and Contingencies - $250,000)
    21     (iv)  Loysville Youth Development Center
    22         (A)  Construct a modular multipurpose
    23             gym/kitchen/classroom building              3,000,000
    24             (Base Project Allocation - $2,500,000)
    25             (Design and Contingencies - $500,000)
    26     (v)  Loysville Complex, South Mountain Secure
    27         Treatment Unit
    28         (A)  Construct a modular multipurpose
    29             gym/kitchen/classroom building              3,000,000
    30             (Base Project Allocation - $2,500,000)
    20070H1589B2829                 - 38 -     

     1             (Design and Contingencies - $500,000)
     2     (vi)  Mayview State Hospital
     3         (A)  Upgrade the primary electrical system
     4             including all central feeder circuits       3,000,000
     5             (Base Project Allocation - $2,500,000)
     6             (Design and Contingencies - $500,000)
     7     (vii)  Norristown State Hospital
     8         (A)  Renovate the boiler plant for building
     9             60, Phase 3 of DGS project 509-29,
    10             reconstruction or replacement of
    11             boilers to meet emissions requirements
    12             and upgrade the steam distribution
    13             system                                      1,800,000
    14             (Base Project Allocation - $1,500,000)
    15             (Design and Contingencies - $300,000)
    16     (viii)  Polk Center
    17         (A)  Replace valves, backwash pump and
    18             replenish filters with new media in
    19             order to keep water plant in compliance
    20             with regulations                            1,400,000
    21             (Base Project Allocation - $1,120,000)
    22             (Design and Contingencies - $280,000)
    23     (ix)  Selinsgrove Center
    24         (A)  Upgrade the boiler controls for the
    25             facility                                      600,000
    26             (Base Project Allocation - $500,000)
    27             (Design and Contingencies - $100,000)
    28         (B)  Purchase and install package boiler
    29             for more efficient handling of summer
    30             steam load                                    960,000
    20070H1589B2829                 - 39 -     

     1             (Base Project Allocation - $800,000)
     2             (Design and Contingencies - $160,000)
     3     (x)  South Mountain Restoration Center
     4         (A)  Purchase and install package boiler
     5             for more efficient handling of summer
     6             steam load                                    840,000
     7             (Base Project Allocation - $700,000)
     8             (Design and Contingencies - $140,000)
     9     (xi)  Torrance State Hospital
    10         (A)  Bore two horizontal wells into a
    11             mountainside to expand and improve
    12             freshwater collection                         720,000
    13             (Base Project Allocation - $600,000)
    14             (Design and Contingencies - $120,000)
    15     (xii)  Wernersville State Hospital
    16         (A)  Upgrade coal boiler refractory and
    17             structural components                         360,000
    18             (Base Project Allocation - $300,000)
    19             (Design and Contingencies - $60,000)
    20     (xiii)  White Haven Center
    21         (A)  Replace the heating systems in
    22             residential buildings from existing old
    23             radiant heat to more modern, digitally-
    24             controlled, high-efficiency HVAC
    25             systems                                     2,400,000
    26             (Base Project Allocation - $2,000,000)
    27             (Design and Contingencies - $400,000)
    28  (11)  Pennsylvania State Police
    29     (i)  Dunmore Headquarters, Lackawanna County
    30         (A)  Construct a new headquarters facility,
    20070H1589B2829                 - 40 -     

     1             garage and hangar to replace existing
     2             facilities in Lackawanna County            10,800,000
     3             (Base Project Allocation - $9,000,000)
     4             (Design and Contingencies - $1,800,000)
     5  (12)  State System of Higher Education
     6     (i)  Bloomsburg University of Pennsylvania
     7         (A)  Additional funding for the renovation
     8             of the Nelson Field House while
     9             providing additional athletic and
    10             office space                                1,000,000
    11         (B)  ADDITIONAL FUNDS FOR RENOVATION OF THE                <--
    12             WALLER ADMINISTRATION BUILDING              6,000,000
    13     (ii)  Cheyney University of Pennsylvania
    14         (A)  Additional funding to replace Browne
    15             Hall including upgrading infrastructure
    16             according to modern codes and fire
    17             safety code requirements                    1,000,000
    18         (B)  ADDITIONAL FUNDS FOR RENOVATION OF                    <--
    19             CARVER SCIENCE BUILDING                     6,000,000
    20         (C)  FUNDING FOR ADA MODIFICATIONS              8,000,000
    21         (D)  WASTEWATER TREATMENT PLANT UPGRADES       10,000,000
    22         (E)  ADDITIONAL FUNDS FOR THE CONSTRUCTION
    23             OF NEW STUDENT HOUSING                     25,000,000
    24     (iii)  California University of Pennsylvania
    25         (A)  Construction and other related costs
    26             to upgrade university stadium
    27             facilities                                    250,000
    28         (B)  HIGH-VOLTAGE UPGRADES                      4,000,000  <--
    29         (C)  RENOVATION OF KEYSTONE HALL               13,000,000
    30         (D)  ADDITIONAL FUNDS FOR PEDESTRIAN AND
    20070H1589B2829                 - 41 -     

     1             VEHICULAR ENHANCEMENTS, PHASE I             2,000,000
     2     (iv)  East Stroudsburg University of
     3             Pennsylvania
     4         (A)  Additional funding for the replacement
     5             of Rosenkrans Hall, providing
     6             additional classroom, laboratory and
     7             office space                                8,000,000  <--
     8             OFFICE SPACE                                9,000,000  <--
     9         (B)  Construction and other costs related
    10             to the East Stroudsburg University
    11             Conference Center                           2,000,000
    12         (C)  Construction and other related costs
    13             to build a parking deck to serve East
    14             Stroudsburg University and Pocono
    15             Medical Center                              3,500,000
    16         (D)  ADDITIONAL FUNDS FOR ADDITION AND                     <--
    17             RENOVATION OF EILER-MARTIN STADIUM          5,000,000
    18         (E)  RENOVATION OF FOOTBALL STADIUM AND
    19             PRESS BOX                                   3,000,000
    20     (v)  Edinboro University of Pennsylvania
    21         (A)  Renovate or replace Ross Hall
    22             including infrastructure and exterior
    23             surfaces                                   10,000,000  <--
    24             SURFACES                                   18,000,000  <--
    25         (B)  ADDITIONAL FUNDS FOR MAINTENANCE
    26             BUILDING REPLACEMENT                        8,000,000
    27     (V.1)  KUTZTOWN UNIVERSITY
    28         (A)  RENOVATIONS AND CONSTRUCTION OF THE
    29             POPLAR HOUSE TO HOUSE THE INSTITUTE FOR
    30             CHILDREN'S HEALTH                           3,500,000
    20070H1589B2829                 - 42 -     

     1     (vi)  Lock Haven University of Pennsylvania
     2         (A)  Costs associated with furniture and
     3             equipment for a new indoor athletic
     4             facility                                    1,000,000
     5     (VII)  CLARION UNIVERSITY OF PENNSYLVANIA                      <--
     6         (A)  ADDITIONAL FUNDS FOR MODIFICATION OF
     7             FACILITIES FOR ADA COMPLIANCE               3,000,000
     8         (B)  ADDITIONAL FUNDS FOR ADDITION AND
     9             RENOVATION OF MARWICK BOYD FINE ARTS
    10             CENTER                                     12,000,000
    11         (C)  RENOVATION AND EXPANSION OF TIPPIN
    12             GYMNASIUM                                  40,000,000
    13     (VIII)  INDIANA UNIVERSITY OF PENNSYLVANIA
    14         (A)  ADDITIONAL FUNDS FOR RENOVATION OF
    15             LEONARD HALL                                7,000,000
    16         (B)  RENOVATION OF STABLEY LIBRARY              7,000,000
    17     (IX)  KUTZTOWN UNIVERSITY OF PENNSYLVANIA
    18         (A)  REPLACEMENT OF SOUTH BLEACHERS IN THE
    19             FOOTBALL STADIUM                            1,000,000
    20         (B)  ADDITIONAL FUNDS FOR UPGRADE OF
    21             KEYSTONE HALL                              16,000,000
    22         (C)  REPLACEMENT OF LYTLE HALL                 30,000,000
    23     (X)  MANSFIELD UNIVERSITY OF PENNSYLVANIA
    24         (A)  WATER TREATMENT PLANT UPGRADES             6,000,000
    25     (XI)  MILLERSVILLE UNIVERSITY OF PENNSYLVANIA
    26         (A)  RENOVATION OF BYERLY HALL                  6,000,000
    27         (B)  RENOVATION OF STAYER BUILDING              7,000,000
    28     (XII)  SHIPPENSBURG UNIVERSITY OF PENNSYLVANIA
    29         (A)  ADDITIONAL FUNDING FOR STEAM
    30             DISTRIBUTION SYSTEM RENOVATION             10,000,000
    20070H1589B2829                 - 43 -     

     1         (B)  REDEVELOPMENT, INCLUDING CONSTRUCTION,
     2             INFRASTRUCTURE AND ACQUISITION OF THE
     3             HOFFMAN MILLS BUILDING                      2,500,000
     4         (C)  CONSTRUCTION AND RELATED
     5             INFRASTRUCTURE TO UPGRADE SHIPPENSBURG
     6             UNIVERSITY ATHLETIC COMPLEX                 1,000,000
     7     (XIII)  SLIPPERY ROCK UNIVERSITY OF
     8         PENNSYLVANIA
     9         (A)  ADDITIONAL FUNDS FOR RENOVATION OF
    10             MORROW FIELD HOUSE                         16,000,000
    11     (XIV)  WEST CHESTER UNIVERSITY OF PENNSYLVANIA
    12         (A)  PHASE I OF CAMPUS GEOTHERMAL UTILITY
    13             CONVERSION                                 10,000,000
    14         (B)  RENOVATION OF MCCARTHY HALL               20,000,000
    15  (13)  Department of Transportation
    16     (i)  Clearfield County
    17         (A)  Replace or rehabilitate District 2-0
    18             Office including an addition on current
    19             site and infrastructure improvements       12,000,000
    20             (Base Project Allocation - $10,000,000)
    21             (Design and Contingencies - $2,000,000)
    22     (ii)  Dauphin County
    23         (A)  Construct or acquire a new county
    24             maintenance facility including salt and
    25             equipment storage buildings and site
    26             development                                13,800,000
    27             (Base Project Allocation - $11,000,000)
    28             (Land Allocation - $1,000,000)
    29             (Design and Contingencies - $1,800,000)
    30         (B)  Construct or acquire a new PennDOT
    20070H1589B2829                 - 44 -     

     1             driver and motor vehicle central
     2             office/service center including design,
     3             site acquisition and construction          58,000,000
     4             (Base Project Allocation - $50,000,000)
     5             (Land Allocation - $3,000,000)
     6             (Design and Contingencies - $5,000,000)
     7     (II.1)  MCKEAN COUNTY                                          <--
     8         (A)  ACQUISITION AND INFRASTRUCTURE RELATED
     9             TO THE CONSTRUCTION OF THE ROUTE 219
    10             VISITOR/DISCOVERY CENTER                    8,200,000
    11     (iii)  Mifflin County
    12         (A)  Construct or acquire a new county
    13             maintenance facility including salt and
    14             equipment storage buildings and site
    15             development                                13,800,000
    16             (Base Project Allocation - $11,000,000)
    17             (Land Allocation - $1,000,000)
    18             (Design and Contingencies - $1,800,000)
    19     (iv)  Wyoming County
    20         (A)  Construct or acquire a new county
    21             maintenance facility including salt and
    22             equipment storage buildings and site
    23             development                                13,800,000
    24             (Base Project Allocation - $11,000,000)
    25             (Land Allocation - $1,000,000)
    26             (Design and Contingencies - $1,800,000)
    27  Section 4.  Itemization of furniture and equipment projects.
    28     Additional capital projects in the category of public
    29  improvement projects consisting of the acquisition of movable
    30  furniture and equipment to complete public improvement projects
    20070H1589B2829                 - 45 -     

     1  and to be purchased by the Department of General Services, its
     2  successors or assigns and to be financed by the incurring of
     3  debt are hereby itemized, together with their respective
     4  estimated financial costs, as follows:
     5                                                           Total
     6                                                          Project
     7             Project                                    Allocation
     8  (1)  Office of Administration
     9     (i)  Statewide mobile radio and microwave
    10         system
    11         (A)  Additional funds for original
    12             furniture and equipment to make the
    13             Statewide radio and microwave system
    14             DGS project 950-10 operational             21,000,000
    15  (2)  Department of Conservation and Natural
    16     Resources
    17     (i)  Benjamin Rush State Park
    18         (A)  Original furniture and equipment for
    19             current capital projects                      217,000
    20     (ii)  Cook Forest State Park
    21         (A)  Original furniture and equipment for
    22             current capital projects                      114,000
    23     (iii)  Delaware Canal State Park
    24         (A)  Original furniture and equipment for
    25             current capital projects                      200,000
    26     (iv)  Kinzua Bridge State Park
    27         (A)  Original furniture and equipment for
    28             current capital projects                    3,000,000
    29     (v)  Nescopeck State Park
    30         (A)  Original furniture and equipment for
    20070H1589B2829                 - 46 -     

     1             current capital projects                      150,000
     2     (vi)  Pine Grove Furnace State Park
     3         (A)  Original furniture and equipment for
     4             current capital projects                      200,000
     5     (vii)  Presque Isle State Park
     6         (A)  Original furniture and equipment for
     7             current capital projects                      400,000
     8     (viii)  Sinnemahoning State Park
     9         (A)  Original furniture and equipment for
    10             current capital projects                    2,000,000
    11  (3)  Department of Corrections
    12     (i)  (Reserved)
    13     (ii)  State Correctional Institution at
    14         Graterford
    15         (A)  Original furniture and equipment for
    16             the new institution at SCI Graterford       6,500,000
    17     (iii)  State Correctional Institution at
    18         Huntingdon
    19         (A)  Original furniture and equipment for
    20             the new institution at SCI Huntingdon       6,500,000
    21     (iv)  State Correctional Institution at
    22         Rockview
    23         (A)  Original furniture and equipment for
    24             the new institution                         6,500,000
    25     (v)  New State Correctional Institution in
    26         Luzerne County
    27         (A)  Original furniture and equipment for
    28             the new institution within a five-mile
    29             radius of SCI Retreat                       6,500,000
    30     (VI)  NEW STATE CORRECTIONAL INSTITUTION IN                    <--
    20070H1589B2829                 - 47 -     

     1         FAYETTE COUNTY
     2         (A)  ORIGINAL FURNITURE AND EQUIPMENT FOR
     3             NEW INSTITUTION                             6,500,000
     4  (4)  Department of Education
     5     (i)  Scranton School for the Deaf
     6         (A)  Movable furniture and equipment to
     7             allow modernization of classrooms and
     8             other buildings to meet current
     9             standards                                   2,625,000
    10     (ii)  Lincoln University
    11         (A)  Movable furniture and equipment to
    12             allow construction project at Wright
    13             Hall to become operational                  3,000,000
    14         (B)  Movable furniture and equipment at
    15             Langston Hughes Library for use for the
    16             completely renovated facility               4,000,000
    17  (4.1)  Department of Military and Veterans Affairs                <--
    18     (i)  Keystone Lodge at Fort Indiantown Gap
    19         (A)  Original furniture and equipment             500,000
    20         (C)  FURNITURE AND EQUIPMENT FOR GRIM HALL                 <--
    21             RENOVATIONS, DGS PROJECT NO. 1101-39        2,000,000
    22         (D)  FURNITURE AND EQUIPMENT FOR ACADEMIC
    23             STUDENT CENTER, DGS PROJECT NO. 1101-
    24             47                                          5,000,000
    25     (III)  THE PENNSYLVANIA STATE UNIVERSITY
    26         (A)  LABS AND ORIGINAL FURNISHINGS FOR THE
    27             CHEMICAL ENGINEERING BUILDING               8,600,000
    28         (B)  ALTOONA CAMPUS, ENGINEERING BUILDING
    29             LAB EQUIPMENT                               4,500,000
    30         (C)  DUBOIS CAMPUS, ENGINEERING BUILDING
    20070H1589B2829                 - 48 -     

     1             LAB EQUIPMENT                               4,500,000
     2         (D)  UNIVERSITY PARK, ENGINEERING BUILDING
     3             LAB EQUIPMENT                              10,000,000
     4  (5)  Pennsylvania Historical and Museum Commission
     5     (i)  Eckley Miners' Village
     6         (A)  Replacement of original furniture and
     7             equipment associated with the visiting
     8             public                                      1,920,000
     9     (ii)  Graeme Park
    10         (A)  Original furniture and equipment
    11             associated with the new orientation
    12             exhibit                                       720,000
    13     (iii)  Landis Valley Museum
    14         (A)  Construct new museum exhibits for the
    15             expanded visitors' center building and
    16             other buildings                             1,800,000
    17     (iv)  State Records Center
    18         (A)  Original furniture and equipment
    19             including a mobile high density storage
    20             system                                      1,800,000
    21  (6)  State System of Higher Education
    22     (I)  BLOOMSBURG UNIVERSITY OF PENNSYLVANIA                     <--
    23         (A)  ADDITIONAL FUNDING FOR ORIGINAL
    24             FURNITURE AND EQUIPMENT FOR SUTLIFF
    25             HALL ADDITION                                 500,000
    26     (II)  EAST STROUDSBURG UNIVERSITY OF
    27         PENNSYLVANIA
    28         (A)  ADDITIONAL FUNDING FOR ORIGINAL
    29             FURNITURE AND EQUIPMENT FOR ROSENKRANS
    30             HALL                                        1,000,000
    20070H1589B2829                 - 49 -     

     1     (i) (III)  Kutztown University of Pennsylvania                 <--
     2         (A)  Supplemental funding for the purchase
     3             of movable furniture and equipment to
     4             allow Schaffer Auditorium construction
     5             project to become operational                 500,000
     6         (B)  FURNITURE, FIXTURES AND EQUIPMENT FOR                 <--
     7             THE SHARADINE ART BUILDING                  1,900,000
     8         (C)  INSTALLATION OF A CAMERA SECURITY
     9             SYSTEM                                      2,000,000
    10     (IV)  LINCOLN UNIVERSITY OF PENNSYLVANIA
    11         (A)  FURNITURE AND EQUIPMENT FOR GRIM HALL
    12             RENOVATION, DGS PROJECT NO. 1101-39         2,000,000
    13         (B)  FURNITURE AND EQUIPMENT FOR ACADEMIC
    14             STUDENT CENTER, DGS PROJECT NO. 1101-
    15             47                                          5,000,000
    16     (ii) (V)  Lock Haven University of Pennsylvania                <--
    17         (A)  Construction and other costs
    18             associated with building a new indoor
    19             athletic facility                          10,000,000
    20         (B)  ADDITIONAL FUNDING FOR ORIGINAL                       <--
    21             FURNITURE AND EQUIPMENT FOR THE OLD
    22             KCSD HIGH SCHOOL RENOVATION PROJECT         1,500,000
    23     (iii) (VI)  Millersville University of                         <--
    24         Pennsylvania
    25         (A)  Supplemental funding for the purchase
    26             of movable furniture and equipment to
    27             allow Theatre Arts Education Building
    28             construction project to become
    29             operational                                   200,000
    30     (iv) (VII)  Shippensburg University of                         <--
    20070H1589B2829                 - 50 -     

     1         Pennsylvania
     2         (A)  Supplemental funding for the purchase
     3             of movable furniture and equipment to
     4             allow Huber Arts Center construction
     5             project to become operational                 500,000
     6     (v) (VIII)  Slippery Rock University of                        <--
     7         Pennsylvania
     8         (A)  Supplemental funding for the purchase
     9             of movable furniture and equipment to
    10             allow Performing Arts Center
    11             construction project to become
    12             operational                                 1,000,000
    13  Section 5.  Itemization of transportation assistance projects.
    14     (a)  Mass transit.--Additional capital projects in the
    15  category of transportation assistance projects for mass transit
    16  in which an interest is to be acquired or constructed by the
    17  Department of Transportation, its successors or assigns and to
    18  be financed by the incurring of debt are hereby itemized,
    19  together with their estimated financial costs, as follows:
    20                                                           Total
    21                                                          Project
    22             Project                                    Allocation
    23  (1)  Beaver County Transit Authority
    24     (i)  Provide for improvements in bus
    25         circulation, passenger waiting and terminal
    26         areas at the Rochester Transportation
    27         Center (RTC), pedestrian improvements with
    28         the Transit Revitalization Investment
    29         District (TRID) area and from the RTC to
    30         the Rochester riverfront development and
    20070H1589B2829                 - 51 -     

     1         signal preemption/prioritization request
     2         system in the TRID area                           317,000
     3             (Base Project Allocation - $285,000)
     4             (Design and Contingencies - $32,000)
     5  (2)  Berks Area Reading Transit Authority
     6     (i)  Purchase and install an Auto Vehicle
     7         Locator System for both fixed route and
     8         paratransit systems                               167,000
     9             (Base Project Allocation - $150,000)
    10             (Design and Contingencies -$17,000)
    11  (3)  Cambria County Transit Authority
    12     (i)  Replace bus wash system, upgrade
    13         communication system and purchase security
    14         surveillance system                               100,000
    15             (Base Project Allocation - $90,000)
    16             (Design and Contingencies - $10,000)
    17     (ii)  Construct rural transfer center to
    18         increase service efficiency, attract new
    19         riders and provide easier transfers for
    20         riders                                            100,000
    21             (Base Project Allocation - $90,000)
    22             (Design and Contingencies - $10,000)
    23  (4)  Capital Area Transit
    24     (i)  Improve and renovate CAT's maintenance
    25         building to include three bays to repair
    26         and service 40-foot low floor buses               233,000
    27             (Base Project Allocation - $210,000)
    28             (Design and Contingencies - $23,000)
    29  (5)  Centre Area Transportation Authority
    30     (i)  Purchase 16 buses to replace buses which
    20070H1589B2829                 - 52 -     

     1         have met their useful life                        167,000
     2             (Base Project Allocation - $150,000)
     3             (Design and Contingencies - $17,000)
     4     (ii)  Purchase automatic vehicle locator system
     5         with the first phase to equip buses and
     6         service vehicles with such items as the
     7         automatic enunciators, electronic
     8         performance monitoring, stop-by-stop
     9         passenger counts, real time passenger
    10         information via the Internet and at major
    11         stops                                             156,000
    12             (Base Project Allocation - $140,000)
    13             (Design and Contingencies - $16,000)
    14     (III)  PARK AND RIDE FACILITY                       2,500,000  <--
    15  (6)  Crawford Area Transportation Authority
    16     (i)  Construct administrative intermodal center
    17         in downtown Meadville and purchase bus
    18         related equipment                                 333,000
    19             (Base Project Allocation - $300,000)
    20             (Design and Contingencies - $33,000)
    21  (6.1)  Elizabethtown Intermodal Transportation
    22     Center
    23     (i)  Construction of a high-level platform and
    24         elevators at existing Elizabethtown train
    25         station                                         2,000,000
    26             (Base Project Allocation - $2,000,000)
    27     (ii)  Construction of a new parking garage
    28         adjacent to Intermodal Transportation
    29         Center                                          4,000,000
    30             (Base Project Allocation - $4,000,000)
    20070H1589B2829                 - 53 -     

     1  (6.2)  ELK COUNTY AREA TRANSPORTATION AUTHORITY                   <--
     2     (I)  CONSTRUCTION OF THE DEPOT STREET
     3         INTERMODAL TRANSPORTATION FACILITY AND
     4         PARKING DECK IN THE CITY OF ST. MARY'S          1,500,000
     5  (7)  Erie Metropolitan Transit Authority
     6     (i)  Acquire five buses to replace five
     7         existing buses which have exceeded their
     8         useful life                                       379,000
     9             (Base Project Allocation - $341,000)
    10             (Design and Contingencies - $38,000)
    11     (ii)  Renovate administration/maintenance
    12         facility and purchase shop and
    13         miscellaneous equipment                            39,000
    14             (Base Project Allocation - $35,000)
    15             (Design and Contingencies - $4,000)
    16     (iii)  Purchase technology upgrades to radio
    17         and fare box systems and complete system
    18         wide signage                                       33,000
    19             (Base Project Allocation - $30,000)
    20             (Design and Contingencies - $3,000)
    21  (7.1)  Indiana County Transit Authority
    22     (i)  Renovation and expansion of bus garage
    23         project                                           260,000
    24             (Base Project Allocation - $260,000)
    25  (7.2)  Port Authority of Allegheny County
    26     (i)  FY 2009-2010 Federal Flex Funds (STP
    27         and/or CMAQ)                                    2,000,000
    28     (ii)  FY 2009-2010 section 5309 fixed guideway
    29         modernization                                   5,000,000
    30     (iii)  FY 2009-2010 East-West Corridor Rapid
    20070H1589B2829                 - 54 -     

     1         Transit                                         5,000,000
     2     (iv)  FY 2009-2010 infrastructure Safety
     3         Renewal Program (ISRP)                         17,000,000
     4     (v)  FY 2009-2010 vehicle overhaul                  4,000,000
     5     (vi)  FY 2009-2010 section 5307 Formula
     6         Program                                         7,000,000
     7     (VII)  COMPLETION OF LINEAR PARK IN EDGEWOOD                   <--
     8         BOROUGH ADJACENT TO EAST BUSWAY FACILITY        7,200,000
     9     (VIII)  CONSTRUCTION AND INFRASTRUCTURE-RELATED
    10         COSTS FOR THE ROBINSON INTERMODAL FACILITY      4,000,000
    11  (7.3)  Luzerne County
    12     (i)  Acquisition, construction, infrastructure
    13         and other related costs for an intermodal
    14         transportation facility in City of Wilkes-
    15         Barre                                           4,000,000
    16  (7.4)  MONTGOMERY COUNTY                                          <--
    17     (I)  CONSTRUCTION AND RENOVATIONS FOR
    18         JENKINTOWN INTERMODAL FACILITY TO INCLUDE
    19         PARKING AND TRANSIT ACCESS                      2,000,000
    20  (7.5)  MOUNT JOY AMTRAK STATION
    21     (I)  INFRASTRUCTURE, CONSTRUCTION AND OTHER
    22         RELATED COSTS FOR THE RENOVATIONS AND
    23         UPGRADES TO FACILITIES, INCLUDING ADA-
    24         RELATED IMPROVEMENTS AND THE CONSTRUCTION
    25         OF A PLATFORM FOR FREIGHT AND PASSENGER
    26         USE                                             1,900,000
    27  (8)  Red Rose Transit Authority
    28     (i)  Replace bus washer and renovation and
    29         expand bus storage building                       375,000
    30             (Base Project Allocation - $337,000)
    20070H1589B2829                 - 55 -     

     1             (Design and Contingencies - $38,000)
     2     (ii)  Design and construct new station on
     3         AMTRAK Harrisburg to Philadelphia line in
     4         Paradise Township, Lancaster County               200,000
     5             (Base Project Allocation - $180,000)
     6             (Design and Contingencies - $20,000)
     7  (9)  Shenango Valley Shuttle Service
     8     (i)  Construct a maintenance facility including
     9         equipment and land acquisition                    250,000
    10             (Base Project Allocation - $225,000)
    11             (Design and Contingencies - $25,000)
    12  (10)  Southeastern Pennsylvania Transportation
    13     Authority
    14     (i)  Provide for the rehabilitation of
    15         improvements at Croyden and Levittown
    16         Stations located in Bucks County with
    17         improvements to include the installation of
    18         bus shelters and transit signage, station
    19         improvements, bus access improvements at
    20         both stations and parking expansion            3,500,000
    21             (Base Project Allocation - $3,150,000)
    22             (Design and Contingencies - $350,000)
    23     (ii)  Provide for the rehabilitation of
    24         improvements to bus and rail intermodal
    25         connections at the Glenside and Jenkintown
    26         Stations in Montgomery County with
    27         improvements to include design and
    28         construction of a multilevel 384 space
    29         parking garage at Glenside Station and a
    30         multilevel 700 space parking garage at
    20070H1589B2829                 - 56 -     

     1         Jenkintown Station                              6,700,000
     2             (Base Project Allocation - $6,030,000)
     3             (Design and Contingencies - $670,000)
     4     (iii)  FFY 2008 Transit Enhancement Program,
     5         provide for renovation and preservation of
     6         historic train stations and related
     7         activities including bus shelters,
     8         landscaping, street lights, pedestrian
     9         access and walkways, bicycle access,
    10         signage and enhanced access to transit for
    11         persons with disabilities                         670,000
    12             (Base Project Allocation - $603,000)
    13             (Design and Contingencies - $67,000)
    14     (iv)  Provide for construction of a multilevel
    15         parking structure and pedestrian overpass
    16         over AMTRAK tracks, to connect the west
    17         side of the campus of Villanova to the main
    18         campus, with parking for approximately
    19         1,000 vehicles and be handicapped
    20         accessible                                        625,000
    21             (Base Project Allocation - $562,000)
    22             (Design and Contingencies - $63,000)
    23     (v)  FFY 2002 Section 5309 Transit Enhancement
    24         Program, provide additional funding for the
    25         acquisition of 104 new rail cars for SEPTA
    26         Regional Rail service                           2,000,000
    27             (Base Project Allocation - $1,800,000)
    28             (Design and Contingencies - $200,000)
    29  (11)  Union and Snyder Transit Authority
    30     (i)  Construct maintenance facility including
    20070H1589B2829                 - 57 -     

     1         equipment and land acquisition                    304,000
     2             (Base Project Allocation - $273,000)
     3             (Design and Contingencies - $31,000)
     4  (12)  Department of Transportation
     5     (i)  Provide for rail passenger improvements
     6         across this Commonwealth including matching
     7         funds for the Keystone Corridor Federal
     8         funding                                        15,000,000
     9             (Base Project Allocation - $13,500,000)
    10             (Design and Contingencies - $1,500,000)
    11     (ii)  Provide for Intercity Bus Capital
    12         Assistance Intermodal Projects and ADA
    13         related facilities/equipment improvements       2,000,000
    14             (Base Project Allocation - $1,800,000)
    15             (Design and Contingencies - $200,000)
    16     (b)  Rural and intercity rail.--Additional capital projects
    17  in the category of transportation assistance projects for rural
    18  and intercity rail service projects to be constructed or with
    19  respect to which an interest is to be acquired by the Department
    20  of Transportation, its successors or assigns and to be financed
    21  by the incurring of debt are hereby itemized, together with
    22  their respective estimated financial costs, as follows:
    23                                                           Total
    24                                                          Project
    25             Project                                    Allocation
    26  (1)  Allegheny Valley Railroad
    27     (i)  P&W Subdivision Phase II railroad
    28         infrastructure rehabilitation and capacity
    29         improvements, including track, roadbed,
    30         bridges and grade crossings from MP 322 to
    20070H1589B2829                 - 58 -     

     1         MP 326 and from MP 1 to MP 31 in Allegheny
     2         and Butler Counties                             2,860,000
     3             (Base Project Allocation - $2,600,000)
     4             (Design and Contingencies - $260,000)
     5     (ii)  W&P Subdivision Phase II railroad
     6         infrastructure rehabilitation and capacity
     7         improvements, including track, roadbed,
     8         bridges and grade crossings from MP 4 to MP
     9         39 in Allegheny and Washington Counties         2,530,000
    10             (Base Project Allocation - $2,300,000)
    11             (Design and Contingencies - $230,000)
    12     (iii)  Glenwood Yard new and rebuilt yard
    13         tracks, capacity improvements, safety
    14         improvements and rail infrastructure
    15         rehabilitation, including track, roadbed,
    16         bridges and grade crossings in Allegheny
    17         County                                          4,840,000
    18             (Base Project Allocation - $4,400,000)
    19             (Design and Contingencies - $440,000)
    20  (1.1)  BEAVER COUNTY                                              <--
    21     (I)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
    22         RELATED COSTS FOR ALIQUIPPA ETHANOL, LLC,
    23         FACILITY                                        6,000,000
    24  (2)  Buffalo and Pittsburgh Railroad
    25     (i)  Rehabilitate mainline track in Armstrong,
    26         Clearfield, Indiana and Jefferson Counties,
    27         from Kittanning to Dubois and Punxsutawney
    28         to Homer City with work to include tie and
    29         rail replacement, surfacing, bridge repair,
    30         switch, road crossing, signal,
    20070H1589B2829                 - 59 -     

     1         communication and any other related work        5,000,000
     2  (2.1)  ALTOONA BLAIR COUNTY DEVELOPMENT                           <--
     3     CORPORATION
     4     (I)  REHABILITATION OF THE BEDFORD SECONDARY
     5         LINE IN BLAIR COUNTY FROM HOLLIDAYSBURG TO
     6         THE WALTER BUSINESS PARK, INCLUDING
     7         ENGINEERING DESIGN, CONSTRUCTION AND
     8         IMPROVEMENT UPGRADES                            2,000,000
     9  (2.2)  BUCKS COUNTY TRANSPORTATION MANAGEMENT
    10     ASSOCIATION
    11     (I)  REHABILITATION AND IMPROVEMENTS ALONG THE
    12         BETHLEHEM BRANCH FROM LANSDALE TO
    13         BUCKS/LEHIGH COUNTY BORDER, INCLUDING
    14         PROPERTY ACQUISITION, ENGINEERING AND
    15         INFRASTRUCTURE STABILIZATION                   12,000,000
    16  (2.3)  DELAWARE AND HUDSON RAILWAY COMPANY
    17     (I)  DEVELOPMENT OF A BULK TERMINAL/TRANSLOAD
    18         FACILITY IN SUSQUEHANNA COUNTY, INCLUDING
    19         LAND ACQUISITION, SITE PREPARATION,
    20         GRADING, RAIL, TIES, BALLAST, SIGNALS,
    21         CUSTOMER SIDINGS, CROSSINGS AND OTHER
    22         RELATED MATERIALS                               5,000,000
    23  (3)  Centre County
    24     (i)  Construction and other costs related to
    25         the SEDA Welded Rail Project Phase IV -
    26         Sayers Dam in Liberty Howard Boggs
    27         Township                                          800,000
    28  (3.1)  CLINTON COUNTY                                             <--
    29     (I)  IMPROVEMENT TO RAILCAR FACILITY AT RENOVO
    30         INDUSTRIAL PARK TO ENHANCE PRODUCTION,
    20070H1589B2829                 - 60 -     

     1         INCLUDING UTILITY IMPROVEMENTS, RAIL
     2         IMPROVEMENTS AND BUILDING RENOVATION AND
     3         IMPROVEMENTS                                    3,000,000
     4  (3.2)  DELAWARE AND HUDSON RAILWAY
     5     (I)  MAINTAIN AND CONSTRUCT RAIL SIDINGS TO
     6         FACILITATE INCREASING FREIGHT VOLUMES AND
     7         IMPROVE SYSTEM CAPACITY FROM PORT OF
     8         PHILADELPHIA TO NEW YORK STATE                  8,800,000
     9     (II)  UPGRADE AND INSTALL SIGNAL AND
    10         COMMUNICATIONS SYSTEMS                          5,225,000
    11     (III)  REHABILITATE HONEY POT YARD RAIL
    12         INFRASTRUCTURE IN LUZERNE COUNTY TO SERVE
    13         CUSTOMERS WITHIN INDUSTRIAL PARK                3,300,000
    14     (IV)  RECONSTRUCT RAIL INFRASTRUCTURE IN
    15         SUSQUEHANNA COUNTY TO PROVIDE SERVICE TO
    16         RAIL/TRUCK TRANSFER FACILITY AND
    17         DISTRIBUTION CENTER                             3,575,000
    18  (3.3)  ERIE COUNTY
    19     (I)  INFRASTRUCTURE, CONSTRUCTION AND OTHER
    20         RELATED COSTS FOR RAIL EXPANSION AT THE
    21         FORMER INTERNATIONAL PAPER SITE CONSISTING
    22         OF CONSTRUCTION OF TWO RAIL BRIDGES AND NEW
    23         RAIL CONSTRUCTION                               5,000,000
    24     (II)  CONSTRUCTION AND RAIL EXPANSION AT
    25         MOUNTFORT TERMINAL                                750,000
    26  (3.4)  FAYETTE COUNTY
    27     (I)  UPGRADE AND EXPAND RAIL ACCESS TO
    28         ALTERNATIVE ENERGY DEVELOPMENT SITE NEAR
    29         UNIONTOWN FOR TRI STATE BIOFUELS SITE,
    30         INCLUDING NEW RAIL SPUR, SWITCHES AND OTHER
    20070H1589B2829                 - 61 -     

     1         RAIL INFRASTRUCTURE MATERIALS                   1,650,000
     2             (BASE PROJECT ALLOCATION - $1,500,000)
     3             (DESIGN AND CONTINGENCIES - $150,000)
     4  (3.5)  KISKI JUNCTION RAILROAD
     5     (I)  CONSTRUCTION OF NINE-MILE EXTENSION NORTH
     6         ALONG EASTERN SHORE OF ALLEGHENY RIVER FROM
     7         SCHENLEY TO CROOKED CREEK ON FORMER CONRAIL
     8         RAILBED                                         5,400,000
     9  (3.6)  LACKAWANNA COUNTY
    10     (I)  PENNSYLVANIA NORTHEAST REGIONAL RAILROAD
    11         AUTHORITY
    12         (A)  PURCHASE AND INSTALLATION OF MATERIALS
    13             NECESSARY FOR THE TRACKAGE AND SPURS TO
    14             PROVIDE RAIL ACCESS AND INFRASTRUCTURE
    15             TO THE NEW ETHANOL PRODUCTION FACILITY
    16             IN MAYFIELD AND CARBONDALE                  2,200,000
    17         (B)  PURCHASE AND INSTALL MATERIALS
    18             NECESSARY FOR THE UPGRADING, REBUILDING
    19             AND REHABILITATION OF THE 18-MILE
    20             CARBONDALE MAINLINE BETWEEN MOOSIC AND
    21             CARBONDALE                                  1,825,000
    22  (4)  Lawrence County
    23     (i)  Acquisition, construction, infrastructure
    24         and other related costs for reconstruction
    25         of rail lines in Ellwood Borough               10,000,000
    26  (5)  Lehigh Valley Rail Management
    27     (i)  Construct access and storage tanks and
    28         rehabilitate track within and around the
    29         Bethlehem Commerce Center                       3,500,000
    30  (6)  Luzerne County
    20070H1589B2829                 - 62 -     

     1     (i)  Acquisition, construction, infrastructure
     2         and other related costs for Whitney Point
     3         rail infrastructure project in Luzerne
     4         Township                                        5,000,000
     5     (II)  CENTER POINTE WEST RAIL PROJECT                 400,000  <--
     6  (6.1)  MERCER COUNTY
     7     (I)  UPDATE RAIL LINE AND CREATE A RAIL SIDING
     8         AT THE MEADVILLE LINE OF NORFOLK AND
     9         SOUTHERN RAILWAY IN SHARPSVILLE                 1,000,000
    10  (6.2)  MONROE COUNTY
    11     (I)  PENNSYLVANIA NORTHEAST REGIONAL RAILROAD
    12         AUTHORITY
    13         (A)  ACQUISITION AND REHABILITATION OF
    14             10.6-MILE RAIL TRACK LINE RUNNING FROM
    15             ANALOMINK TO THE DELAWARE WATER GAP
    16             FROM NORFOLK SOUTHERN                       1,500,000
    17  (6.3)  MONTGOMERY COUNTY
    18     (I)  REHABILITATION OF STONEY CREEK BRANCH FROM
    19         NORRISTOWN TO LANSDALE, INCLUDING A NEW
    20         SIDE TRACK TO LANSDALE WAREHOUSE AND
    21         INCREASED CAPACITY AT LANSDALE YARD            12,000,000
    22  (7)  Northumberland County
    23     (i)  Infrastructure and other related costs to
    24         extend rail service to the SEEDCO
    25         Industrial Park in Coal Township                3,500,000
    26     (II)  UPGRADE OF RAIL LINE, INCLUDING                          <--
    27         INFRASTRUCTURE AND OTHER RELATED
    28         IMPROVEMENTS FOR THE PROVISION OF RAIL
    29         SERVICE FOR THE SUNPOINT RENEWABLE ENERGY
    30         PROJECT                                         2,000,000
    20070H1589B2829                 - 63 -     

     1  (7.1)  PITTSBURGH AND OHIO CENTRAL RAILROAD
     2     (I)  INFRASTRUCTURE IMPROVEMENTS IN ALLEGHENY
     3         COUNTY                                          5,225,000
     4     (II)  INFRASTRUCTURE IMPROVEMENTS IN ALLEGHENY
     5         AND WASHINGTON COUNTIES                         4,400,000
     6     (III)  CONSTRUCTION PROJECTS IN ALLEGHENY,
     7         BEAVER AND WASHINGTON COUNTIES                 10,100,000
     8     (IV)  CONSTRUCTION PROJECTS IN BEAVER,
     9         WASHINGTON AND ALLEGHENY COUNTIES              11,550,000
    10  (7.2)  READING BLUE MOUNTAIN AND NORTHERN RAILROAD
    11     (I)  TRACK REHABILITATION ON MAINLINE AND
    12         BRANCHLINES TO SUPPORT INCREASED CAR
    13         WEIGHTS AND INCREASED BUSINESS IN DISTRICT
    14         4 IN LUZERNE, LACKAWANNA, CARBON AND
    15         WYOMING COUNTIES                                4,500,000
    16     (II)  REHABILITATION OF C&H BRANCH FROM DELANO
    17         JUNCTION TO JEDDO COAL FACILITY IN HAZLETON
    18         FOR NEW INTERMODAL, DREDGE, COAL AND OTHER
    19         BUSINESS IN LUZERNE COUNTY                      3,200,000
    20     (III)  REHABILITATION OF TRACK IN CRESTWOOD
    21         INDUSTRIAL PARK, INCLUDING EXTENDING AND
    22         BUILDING TRACKS IN PENOBSCOT YARD IN
    23         LUZERNE COUNTY                                  2,400,000
    24     (IV)  CONSTRUCTION OF NEW RUNAROUND, SIDING AND
    25         ASSOCIATED SWITCHES FOR A NEW INTERCHANGE
    26         LOCATION IN NESQUEHONING IN CARBON COUNTY       1,700,000
    27     (V)  PURCHASE OF NEW OPEN TOP AND COVERED
    28         HOPPER CARS                                    12,000,000
    29     (VI)  REHABILITATION OF RAILROAD BRIDGES,
    30         CULVERTS AND OTHER INFRASTRUCTURE BETWEEN
    20070H1589B2829                 - 64 -     

     1         WHITE HAVEN AND SCRANTON IN LUZERNE COUNTY      1,000,000
     2     (VII)  CONSTRUCTION OF RUNAROUND AND EXTENSION
     3         OF TRACK IN THE SCRANTON AREA                   2,000,000
     4  (7.1) (7.3)  Rosebud Mining Railroad Expansion                    <--
     5     (i)  Extension of Rosebud Mining Railroad line
     6         in Bethel Township                              5,000,000
     7             (Base Project Allocation - $5,000,000)
     8  (7.4)  SNYDER COUNTY                                              <--
     9     (I)  RAIL IMPROVEMENTS TO THE SUNBURY
    10         GENERATION STATION, INCLUDING TRACK,
    11         CONSTRUCTION OF NEW RAIL STACKOUT
    12         FACILITIES AND RAIL DUMPER UPGRADES,
    13         INCLUDING ENCLOSING THE FACILITY                6,994,000
    14  (7.5)  WASHINGTON COUNTY
    15     (I)  PENN RIDGE COAL COMPANY, LLC, CONSTRUCT
    16         NEW SIDING AND LOADING FACILITY FOR NEW
    17         COAL MINE COMPLEX NEW AVELLA, INCLUDING
    18         SURFACE PREPARATIONS, RAILS, TIES AND OTHER
    19         RELATED RAIL INFRASTRUCTURE                     5,500,000
    20             (BASE PROJECT ALLOCATION - $5,000,000)
    21             (DESIGN AND CONTINGENCIES - $500,000)
    22  (7.6)  WESTERN NEW YORK AND PENNSYLVANIA RAILROAD,
    23     LLC
    24     (I)  UPGRADE SIGNALS ON THE BUFFALO MAIN LINE
    25         FROM STATE LINE TO DRIFTWOOD IN MCKEAN AND
    26         CAMERON COUNTIES, INCLUDING PLANNING,
    27         ENGINEERING AND CONTINGENCIES                     200,000
    28     (II)  REHABILITATION OF THE BUFFALO MAIN LINE
    29         FROM STATE LINE TO DRIFTWOOD IN MCKEAN AND
    30         CAMERON COUNTIES, INCLUDING THE REPLACEMENT
    20070H1589B2829                 - 65 -     

     1         OF CROSSTIES AND TRACK SURFACING                  500,000
     2     (III)  REHABILITATION OF THE OIL CITY BRANCH
     3         FROM MEADVILLE TO ROUSEVILLE IN CRAWFORD,
     4         MERCER AND VENANGO COUNTIES, INCLUDING THE
     5         REPLACEMENT OF CROSSTIES, TRACK SURFACING,
     6         PLANNING AND CONTINGENCIES                      1,667,000
     7     (IV)  REHABILITATION OF THE MEADVILLE-HORNELL
     8         MAIN LINE FROM MEADVILLE TO STATE LINE IN
     9         CRAWFORD, ERIE AND WARREN COUNTIES,
    10         INCLUDING CROPPING AND WELDING OF RAIL,
    11         TIES AND SURFACING                              6,667,000
    12     (V)  REHABILITATION OF THE FARMERS VALLEY
    13         BRANCH FROM ELDRED TO FARMERS VALLEY IN
    14         MCKEAN COUNTY, INCLUDING THE REPLACEMENT OF
    15         CROSSTIES, TRACK SURFACING, PLANNING AND
    16         CONTINGENCIES                                     333,000
    17  (8)  Westmoreland County
    18     (i)  Construction and other related costs for
    19         the Norfolk Southern Commuter Rail Project     30,000,000
    20     (ii)  Development of the Alle-Kiski Commuter
    21         Rail Project                                    3,000,000
    22  (9)  Westmoreland County Industrial Development
    23     Corporation
    24     (i)  Mount Pleasant Subdivision rail
    25         infrastructure rehabilitation and capacity
    26         improvements, including track, roadbed,
    27         bridges and grade crossings from MP 0 to MP
    28         15 in Westmoreland and Fayette Counties         2,860,000
    29             (Base Project Allocation - $2,600,000)
    30             (Design and Contingencies - $260,000)
    20070H1589B2829                 - 66 -     

     1     (ii)  Radebaugh Subdivision rail infrastructure
     2         rehabilitation and capacity improvements,
     3         including track, roadbed, bridges and grade
     4         crossings from MP 0 to MP 18 in
     5         Westmoreland County                             2,640,000
     6             (Base Project Allocation - $2,400,000)
     7             (Design and Contingencies - $240,000)
     8     (iii)  Development of new yard track structure
     9         and rail infrastructure rehabilitation and
    10         capacity improvements, including track,
    11         roadbed, bridges and grade crossings within
    12         Westmoreland Rail Freight Terminal in
    13         Westmoreland County                             1,540,000
    14             (Base Project Allocation - $1,400,000)
    15             (Design and Contingencies - $140,000)
    16  (10)  WHEELING AND LAKE ERIE RAILWAY                              <--
    17     (I)  REHABILITATE SEGMENTS OF THE MAIN LINE,
    18         INCLUDING RAILS, TIES, BALLAST, GRADING,
    19         SWITCHES, CROSSINGS AND BRIDGES IN
    20         ALLEGHENY AND WASHINGTON COUNTIES              10,100,000
    21     (II)  REHABILITATE TIES, BALLAST, RAILS,
    22         CROSSINGS, BRIDGES AND SWITCHES IN FAYETTE
    23         AND WESTMORELAND COUNTIES                      10,100,000
    24     (III)  CONSTRUCT AND REHABILITATE NEW AND
    25         EXISTING CUSTOMER SIDINGS IN ALLEGHENY,
    26         WASHINGTON, FAYETTE AND WESTMORELAND
    27         COUNTIES, INCLUDING SWITCHES, SIGNALS,
    28         RAILS, TIES, BALLAST AND OTHER RELATED
    29         MATERIALS                                       7,700,000
    30     (IV)  UPGRADE BRIDGES AND TUNNELS IN
    20070H1589B2829                 - 67 -     

     1         WESTMORELAND, FAYETTE, WASHINGTON AND
     2         ALLEGHENY COUNTIES                             22,000,000
     3     (c)  Air transportation.--Additional capital projects in the
     4  category of transportation assistance projects for air
     5  transportation service to which an interest is to be acquired by
     6  the Department of Transportation, its successors or assigns and
     7  to be financed by the incurring of debt are hereby itemized,
     8  together with their respective estimated financial costs, as
     9  follows:
    10                                                           Total
    11                                                          Project
    12             Project                                    Allocation
    13  (1)  Allegheny County
    14     (i)  Allegheny County Airport Authority
    15         (A)  Upgrade to Allegheny County Airport
    16             Terminal and surrounding runways in
    17             West Mifflin Borough                          500,000  <--
    18             WEST MIFFLIN BOROUGH                        5,000,000  <--
    19  (1.1)  BUCKS COUNTY
    20     (I)  QUAKERTOWN AIRPORT
    21         (A)  DESIGN, SITE WORK, INFRASTRUCTURE AND
    22             CONSTRUCTION OF A NEW FUEL SYSTEM             400,000
    23  (2)  Clinton County
    24     (i)  William T Piper Memorial Airport
    25         (A)  Construction, redevelopment and other
    26             costs related to the Airport Hangar
    27             Rehabilitation and Construction Project
    28             in Lock Haven Borough                         500,000
    29  (2.1)  Indiana County
    30     (i)  Jimmy Stewart Airport
    20070H1589B2829                 - 68 -     

     1         (A)  Acquisition, related infrastructure
     2             and construction of an access road and
     3             hangars at the Jimmy Stewart Airport        2,000,000
     4             (Base Project Allocation - $2,000,000)
     5  (2.2)  LANCASTER COUNTY                                           <--
     6     (I)  LANCASTER AIRPORT AUTHORITY
     7         (A)  SITE DEVELOPMENT AND CONSTRUCTION OF
     8             T-HANGAR AND OFFICES                        1,000,000
     9         (B)  SITE DEVELOPMENT AND CONSTRUCTION OF
    10             CORPORATE HANGAR AND OFFICES                2,000,000
    11         (C)  DESIGN, SITE WORK AND CONSTRUCTION TO
    12             REHABILITATE T/W'S FOXTROT AND MIKE         2,000,000
    13  (3)  Lehigh County
    14     (i)  Lehigh Valley International Airport
    15         (A)  Provide for the economic development
    16             and safety enhancement at the airport       5,000,000
    17             (Base Project Allocation - $4,500,000)
    18             (Design and Contingencies - $500,000)
    19  (4)  Luzerne County
    20     (i)  Hazle Township
    21         (A)  Acquisition, construction,
    22             infrastructure and other related costs
    23             for the development of a cargo airport    250,000,000
    24  (4.1)  LYCOMING COUNTY                                            <--
    25     (I)  WILLIAMSPORT REGIONAL AIRPORT
    26         (A)  CONSTRUCTION OF A FUEL FARM AND RUNWAY
    27             APRON                                         500,000
    28  (4.1) (4.2)  Monroe County                                        <--
    29     (i)  Pocono Mountains Municipal Airport
    30         (A)  Runway expansion at the Pocono
    20070H1589B2829                 - 69 -     

     1             Mountains Municipal Airport                 1,000,000
     2             (Base Project Allocation - $1,000,000)
     3  (4.3)  VENANGO COUNTY                                             <--
     4     (I)  VENANGO REGIONAL AIRPORT
     5         (A)  INFRASTRUCTURE AND CONSTRUCTION OF A
     6             CORPORATE HANGAR FACILITY                     300,000
     7  (5)  Washington County
     8     (I)  NORTH FRANKLIN TOWNSHIP                                   <--
     9         (A)  AERIAL RIGHT-OF-WAY FOR ILS
    10             GLIDESCOPE                                    500,000
    11     (i) (II)  South Franklin Township                              <--
    12         (A)  Construction, infrastructure and other
    13             related costs for the Washington County
    14             Airport infrastructure project              1,000,000
    15         (B)  Acquisition, construction,
    16             infrastructure and other related costs
    17             for the Washington County Airport
    18             expansion                                   2,000,000
    19  Section 6.  Itemization of redevelopment assistance capital
    20                 projects.
    21  (1)  Adams County
    22     (i)  County projects (Reserved)
    23     (II)  ADAMS COUNTY ECONOMIC DEVELOPMENT                        <--
    24         CORPORATION
    25         (A)  ACQUISITION, INFRASTRUCTURE AND OTHER
    26             RELATED COSTS, INCLUDING A TARGET SITE
    27             ASSESSMENT FOR A NEW BUSINESS PARK
    28             ALONG THE U.S. ROUTE 15 CORRIDOR           10,000,000
    29     (III)  ADAMS COUNTY HISTORICAL SOCIETY
    30         (A)  RENOVATIONS, REHABILITATION AND OTHER
    20070H1589B2829                 - 70 -     

     1             RELATED COSTS FOR REPAIRS AND UPGRADES,
     2             INCLUDING ADA RESTROOMS AND ELEVATOR TO
     3             THE HISTORICAL SCHMUCKER HALL OF THE
     4             LUTHERAN THEOLOGICAL SEMINARY AT
     5             GETTYSBURG                                  4,000,000
     6     (ii) (IV)  Carroll Valley Borough                              <--
     7         (A)  Planning, design and construction of a
     8             new Carroll Valley Borough Building           800,000
     9  (2)  Allegheny County
    10     (i)  County projects
    11         (A)  Acquisition, construction and other
    12             related costs for the Millvale Marina
    13             to Sharpsburg recreation project            1,000,000
    14         (B)  SITE PREPARATION, INFRASTRUCTURE AND                  <--
    15             CONSTRUCTION RELATED TO A LIFESTYLE
    16             CENTER/MIXED-USE DEVELOPMENT LOCATED AT
    17             THE KIRWAN HEIGHTS INTERCHANGE OF
    18             INTERSTATE 79                              10,000,000
    19         (C)  INFRASTRUCTURE IMPROVEMENTS,
    20             CONSTRUCTION AND OTHER COSTS RELATED TO
    21             THE ALLEGHENY TOGETHER BUSINESS
    22             DISTRICT REVITALIZATION PROJECT            10,000,000
    23     (ii)  City of Pittsburgh
    24         (A)  Acquisition, construction,
    25             infrastructure and other related costs
    26             for the Morningside Community Center          725,000
    27         (B)  Construction and other related costs
    28             for Pittsburgh Life Sciences expansion      1,000,000
    29         (C)  Construction, acquisition,
    30             infrastructure, redevelopment and other
    20070H1589B2829                 - 71 -     

     1             costs related to the revitalization at
     2             Perry South                                 1,500,000
     3         (D)  Construction, infrastructure,
     4             redevelopment and other costs related
     5             to Allegheny General Hospital
     6             renovations                                 7,000,000  <--
     7             RENOVATIONS                                15,000,000  <--
     8         (E)  Construction, acquisition,
     9             redevelopment and other costs related
    10             to the Center Avenue and Thelma Lovette
    11             Family YMCA projects                        3,500,000
    12         (F)  Construction and other related costs
    13             for the renovation of the Marian Manor
    14             senior health facility                        550,000
    15         (G)  Construction, acquisition,
    16             infrastructure, redevelopment,
    17             abatement of hazardous materials and
    18             other costs related to the Strip
    19             District project                            6,000,000
    20         (H)  Construction, infrastructure,
    21             redevelopment and other costs
    22             associated with the Beechview
    23             redevelopment project                       3,000,000
    24         (I)  Construction, infrastructure and other
    25             related costs for Strip District
    26             improvements                                2,000,000
    27         (J)  Construction, infrastructure and other
    28             related costs for Strip District
    29             infrastructure improvements                 6,000,000
    30         (K)  Construction and other related costs
    20070H1589B2829                 - 72 -     

     1             to renovate Family House University
     2             Club                                        1,500,000
     3         (L)  Construction, redevelopment and other
     4             costs associated with renovation and
     5             expansion of the Robert Morris
     6             University downtown campus                  5,000,000
     7         (M)  Acquisition, construction and other
     8             related costs for UPMC St. Margaret
     9             expansion                                  15,600,000
    10         (N)  Construction, infrastructure and other
    11             related costs to restore and expand
    12             Deans Athletic Field community park           588,000
    13         (O)  Construction, acquisition,
    14             infrastructure, redevelopment,
    15             abatement of hazardous materials and
    16             other costs related to the development
    17             of Lawrenceville                           10,000,000
    18         (P)  Construction and other related costs
    19             for Riverview Towers renovations            1,800,000
    20         (Q)  Construction, infrastructure and
    21             related costs for the Grandview Scenic
    22             Byway project                               1,000,000
    23         (R)  Construction and other related costs
    24             for the Brookline Boulevard project         3,900,000
    25         (S)  Construction and other related costs
    26             for the Homewood Brushton Community
    27             Development Corporation Sterret-Collier
    28             corridor revitalization                     5,000,000
    29         (T)  Construction and other related costs
    30             for Route 51 corridor redevelopment and
    20070H1589B2829                 - 73 -     

     1             improvement                                 5,000,000
     2         (U)  Construction, infrastructure and other
     3             related costs for the National Aviary
     4             expansion                                   5,000,000
     5         (V)  Construction, infrastructure and other
     6             related costs for the Urban League of
     7             Greater Pittsburgh Charter School           1,500,000
     8         (W)  Construction and other related costs
     9             for the revitalization of Broadway
    10             Avenue                                      7,000,000
    11         (X)  Acquisition, construction,
    12             infrastructure and other related costs
    13             for the Pittsburgh Zoo and PPG
    14             Aquarium                                    5,000,000
    15         (Y)  Acquisition, construction,
    16             infrastructure and other related costs
    17             for the University of Pittsburgh
    18             MEDICAL CENTER/UNIVERSITY OF PITTSBURGH                <--
    19             Diabetes Institute                         20,000,000
    20         (Z)  Acquisition, construction,                            <--
    21             infrastructure and other related costs
    22             for the Pittsburgh Zoo and PPG
    23             Aquarium                                      500,000
    24         (Z)  CONSTRUCTION OF SCIENCE CENTER,                       <--
    25             COMMUNITY COLLEGE OF ALLEGHENY COUNTY      14,500,000
    26         (AA)  INFRASTRUCTURE IMPROVEMENTS,
    27             RENOVATIONS AND CONSTRUCTION FOR WQED       2,000,000
    28         (BB)  ACQUISITION, RENOVATIONS AND
    29             CONSTRUCTION OF A NEW FACILITY FOR THE
    30             PITTSBURGH OPERA                            4,500,000
    20070H1589B2829                 - 74 -     

     1         (CC)  RENOVATIONS AND CONSTRUCTION OF A LOW
     2             TO MODERATE INCOME SENIOR HEALTH CARE
     3             FACILITY                                      500,000
     4         (DD)  ACQUISITION, INFRASTRUCTURE
     5             IMPROVEMENTS AND CONSTRUCTION OF THE
     6             WOOD STREET COMMONS                         3,000,000
     7         (EE)  EXPANSION, RENOVATION, INFRASTRUCTURE
     8             IMPROVEMENTS AND CONSTRUCTION OF THE
     9             WESTERN PENNSYLVANIA HOSPITAL CAMPUS       10,000,000
    10         (FF)  ACQUISITION, RENOVATIONS,
    11             INFRASTRUCTURE IMPROVEMENTS AND
    12             CONSTRUCTION FOR THE WESTERN
    13             PENNSYLVANIA HOSPITAL SCHOOL OF
    14             NURSING                                    10,000,000
    15         (GG)  INFRASTRUCTURE IMPROVEMENTS AND
    16             CONSTRUCTION OF MERCY HOSPITAL
    17             DEPARTMENT OF EMERGENCY MEDICINE
    18             FACILITY                                   10,000,000
    19         (HH)  CONSTRUCTION, INFRASTRUCTURE,
    20             REDEVELOPMENT AND OTHER COSTS RELATED
    21             TO THE STERLING PLAZA II PROJECT            5,000,000
    22         (II)  ACQUISITION, CONSTRUCTION,
    23             INFRASTRUCTURE AND OTHER COSTS RELATED
    24             TO THE IRONWORKERS LOCAL UNION NO. 3
    25             EXPANSION PROJECT                           1,500,000
    26         (JJ)  CONSTRUCTION, ACQUISITION,
    27             REDEVELOPMENT AND OTHER RELATED COSTS
    28             FOR THE STEAMFITTERS LOCAL UNION 449
    29             EXPANSION PROJECT                          2,500,000
    30         (KK)  BIOTECHNOLOGY COMMERCIALIZATION
    20070H1589B2829                 - 75 -     

     1             PROJECT INCLUDING INFRASTRUCTURE
     2             IMPROVEMENTS AND OTHER RELATED COSTS        3,000,000
     3         (LL)  CONSTRUCTION AND OTHER COSTS RELATED
     4             TO THE CENTRALIZATION OF FACILITIES FOR
     5             UJF                                         1,500,000
     6         (MM)  CONSTRUCTION AND OTHER COSTS RELATED
     7             TO THE RENOVATION OF THE LITTLE SISTERS
     8             OF THE POOR HEALTH CARE PAVILION              500,000
     9         (NN)  INFRASTRUCTURE IMPROVEMENTS,
    10             CONSTRUCTION AND OTHER COSTS RELATED TO
    11             THE MARY SCHENLEY BUILDING RENOVATIONS
    12             AT THE WESTERN PENNSYLVANIA SCHOOL FOR
    13             BLIND CHILDREN                              2,000,000
    14         (OO)  INFRASTRUCTURE IMPROVEMENTS,
    15             CONSTRUCTION AND OTHER COSTS RELATED TO
    16             THE GARFIELD HEIGHTS PHASE I
    17             REDEVELOPMENT PROJECT                       4,000,000
    18     (iii)  Baldwin Borough
    19         (A)  Construction and other related costs
    20             to renovate fire department building          500,000
    21         (B)  INFRASTRUCTURE IMPROVEMENTS AND                       <--
    22             CONSTRUCTION FOR ACADEMY/DBA COMMUNITY
    23             SPECIALIST CORP FACILITY                    4,000,000
    24     (iv)  Bethel Park
    25         (A)  Construction and other related costs
    26             for the Bethel Park Community Center
    27             expansion                                   2,500,000
    28     (v)  Borough of Wilkinsburg
    29         (A)  Construction and other related costs
    30             for the revitalization of commercial
    20070H1589B2829                 - 76 -     

     1             corridor including residential housing      5,000,000
     2         (B)  CONSTRUCTION, REDEVELOPMENT AND OTHER                 <--
     3             COSTS RELATED TO THE SMART APARTMENT
     4             PROJECT                                     1,500,000
     5     (V.1)  CASTLE SHANNON
     6         (A)  CONSTRUCTION, INFRASTRUCTURE,
     7             ACQUISITION, REDEVELOPMENT AND OTHER
     8             COSTS RELATED TO THE SHANNON STATION
     9             TRANSIT VILLAGE                             3,000,000
    10     (vi)  Dravosburg Borough
    11         (A)  Acquisition, construction and other
    12             related costs for the Dravosburg
    13             waterfront development                        500,000
    14     (VI.1)  BOROUGH OF EDGEWOOD                                    <--
    15         (A)  COMPLETION OF LINEAR PARK IN EDGEWOOD
    16             BOROUGH ADJACENT TO THE PORT AUTHORITY
    17             OF ALLEGHENY COUNTY EAST BUSWAY
    18             FACILITY                                    3,600,000
    19     (vii)  Glassport Borough
    20         (A)  Construction and other related costs
    21             for the municipal building
    22             redevelopment                                 500,000
    23         (B)  Acquisition, construction and other
    24             related costs for demolition and
    25             redevelopment of abandoned properties         500,000
    26     (viii)  Green Tree Borough
    27         (A)  Construction and other related costs
    28             for Aiken Elementary School
    29             improvements                                  500,000
    30         (B)  Construction and other related costs
    20070H1589B2829                 - 77 -     

     1             for the Green Tree Road improvement
     2             project                                     3,000,000
     3     (VIII.1)  HOMESTEAD BOROUGH                                    <--
     4         (A)  INFRASTRUCTURE IMPROVEMENTS,
     5             RENOVATIONS AND CONSTRUCTION OF THE
     6             HISTORIC HOMESTEAD BAKERY                   2,200,000
     7     (VIII.2)  LIBERTY BOROUGH
     8         (A)  RENOVATIONS AND INFRASTRUCTURE
     9             IMPROVEMENTS TO SOUTH ALLEGHENY
    10             MIDDLE/HIGH SCHOOL LIBRARY                  1,000,000
    11     (ix)  Town of McCandless
    12         (A)  Construction and other related costs
    13             for the UPMC Passavant Patient Tower
    14             expansion                                  20,000,000
    15     (IX.1)  NORTH PARK/MCCANDLESS TOWNSHIP                         <--
    16         (A)  FACILITY UPGRADES AND INFRASTRUCTURE
    17             IMPROVEMENTS TO ALLEGHENY COUNTY FIRE
    18             TRAINING ACADEMY                            1,000,000
    19     (x)  City of McKeesport
    20         (A)  Construction, abatement of hazardous
    21             materials and other costs associated
    22             with the McKeesport Fire Department
    23             building project                            1,000,000
    24         (B)  Construction, infrastructure and other
    25             costs associated with the Marshall
    26             Drive redevelopment project                   500,000
    27     (X.1)  MCKEES ROCKS BOROUGH                                    <--
    28         (A)  ACQUISITION, INFRASTRUCTURE
    29             IMPROVEMENTS, CONSTRUCTION AND RELATED
    30             COSTS FOR CHARTIERS CROSSING DOWNTOWN
    20070H1589B2829                 - 78 -     

     1             REVITALIZATION PROJECT                      7,000,000
     2         (B)  REDEVELOPMENT, CONSTRUCTION AND OTHER
     3             COSTS RELATED TO A CULTURAL ARTS
     4             CENTER                                      1,500,000
     5     (X.2)  MONROEVILLE BOROUGH
     6         (A)  EXPANSION, RENOVATION AND CONSTRUCTION
     7             OF SPECTRUM CHARTER SCHOOL                  1,000,000
     8         (B)  EXPANSION, RENOVATION, INFRASTRUCTURE
     9             IMPROVEMENTS AND CONSTRUCTION OF
    10             FACILITIES FOR THE WESTERN PENNSYLVANIA
    11             HOSPITAL - FORBES REGIONAL CAMPUS          10,000,000
    12     (xi)  Mt. Lebanon Township
    13         (A)  Construction and other related costs
    14             for the redevelopment of Washington
    15             Road business district                      2,500,000
    16         (B)  Construction and other related costs
    17             for a transit-oriented development
    18             project                                     1,000,000
    19         (C)  INFRASTRUCTURE, CONSTRUCTION,                         <--
    20             REHABILITATION AND REDEVELOPMENT OF THE
    21             SETON-LA SALLE HIGH SCHOOL ATHLETIC
    22             FIELD INTO A STATE-OF-THE-ART MULTIUSE
    23             ATHLETIC FACILITY                             500,000
    24     (XI.1)  NATRONA HEIGHTS
    25         (A)  EXPANSION, RENOVATION AND CONSTRUCTION
    26             AND INFRASTRUCTURE IMPROVEMENTS TO
    27             ALLE-KISKI MEDICAL CENTER CAMPUS           10,000,000
    28     (XI.2)  NEVILLE TOWNSHIP
    29         (A)  ACQUISITION, INFRASTRUCTURE
    30             IMPROVEMENTS, CONSTRUCTION AND OTHER
    20070H1589B2829                 - 79 -     

     1             COSTS RELATED TO THE NEVILLE CROSSING
     2             REVITALIZATION PROJECT                      3,000,000
     3     (XI.3)  PINE TOWNSHIP
     4         (A)  CONSTRUCTION OF A NEW VOLUNTEER FIRE
     5             COMPANY FACILITY                            2,300,000
     6     (XI.4)  ROBINSON TOWNSHIP
     7         (A)  INFRASTRUCTURE IMPROVEMENTS,
     8             CONSTRUCTION AND OTHER COSTS RELATED TO
     9             THE CARNEGIE MUSEUMS BUILDING AND MUSIC
    10             HALL RENOVATION PROJECTS                    2,000,000
    11     (xii)  Fox Chapel Borough and O'Hara Township
    12         (A)  Acquisition and construction related
    13             to redevelopment of CCLA Laure Ann West
    14             Memorial Library                            1,000,000
    15     (XIII)  CORAOPOLIS BOROUGH                                     <--
    16         (A)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
    17             COSTS RELATED TO THE DEVELOPMENT OF A
    18             RECREATIONAL STADIUM AND AMENITIES          5,000,000
    19     (XIV)  MCCANDLESS TOWNSHIP
    20         (A)  RENOVATION AND REHABILITATION AND
    21             TECHNOLOGY UPGRADES TO THE JOHN J.
    22             WRIGHT LIBRARY AT LA ROCHE COLLEGE            500,000
    23     (XV)  PLUM BOROUGH
    24         (A)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
    25             RELATED COSTS FOR A SENIOR HEALTH CARE
    26             FACILITY                                    5,000,000
    27     (XVI)  PENN HILLS TOWNSHIP
    28         (A)  INFRASTRUCTURE IMPROVEMENTS AND
    29             CONSTRUCTION OF IMANI CHRISTIAN
    30             ACADEMY                                     2,500,000
    20070H1589B2829                 - 80 -     

     1     (XVII)  SUMMIT TOWNSHIP
     2         (A)  INFRASTRUCTURE IMPROVEMENTS,
     3             RENOVATIONS AND CONSTRUCTION OF SUMMIT
     4             ACADEMY                                     4,000,000
     5     (XVIII)  WHITE OAK BOROUGH
     6         (A)  CONSTRUCTION AND RENOVATIONS OF A
     7             WHITE OAK COMMUNITY RECREATION AND
     8             SENIOR CITIZEN CENTER                       1,500,000
     9  (3)  Armstrong County
    10     (i)  County projects (Reserved)
    11     (I.1)  ARMSTRONG COUNTY INDUSTRIAL DEVELOPMENT                 <--
    12         AUTHORITY
    13         (A)  ACQUISITION, INFRASTRUCTURE AND
    14             CONSTRUCTION OF THE ARMSTRONG
    15             TECHNOLOGY CENTER, A MIXED-USE
    16             FACILITY, INCLUDING MANUFACTURING
    17             SPACE                                       2,000,000
    18     (ii)  City of Parker
    19         (A)  Land acquisition, site development and
    20             construction to support the
    21             revitalization of downtown Parker             500,000
    22     (iii)  East Franklin Township
    23         (A)  Construction, infrastructure and other
    24             related costs for Armstrong County
    25             Commons                                    10,000,000
    26     (iv)  West Kittanning Borough
    27         (A)  Acquisition of land, demolition and
    28             construction of borough building              500,000
    29  (4)  Beaver County
    30     (i)  County projects (Reserved)
    20070H1589B2829                 - 81 -     

     1         (A)  Acquisition, construction,
     2             infrastructure and other related costs
     3             for a family services center                3,000,000
     4     (I.1)  CITY OF ALIQUIPPA                                       <--
     5         (A)  INFRASTRUCTURE IMPROVEMENTS AND
     6             CONSTRUCTION OF ETHANOL PRODUCTION
     7             FACILITY IN THE ALIQUIPPA INDUSTRIAL
     8             PARK                                        6,000,000
     9     (I.2)  CITY OF BEAVER FALLS
    10         (A)  CONSTRUCTION AND RENOVATIONS TO THE
    11             SBC MINISTRIES, INC., FACILITY                500,000
    12     (ii)  Center Township
    13         (A)  Acquisition, construction,
    14             infrastructure and other related costs
    15             for the Gateway Youth Services Center       3,000,000
    16     (iii)  Midland Borough
    17         (A)  Acquisition, construction,
    18             infrastructure and other related costs
    19             for the Beaver County Industrial
    20             Museum                                      1,500,000
    21  (5)  Bedford County
    22     (i)  County projects (Reserved)
    23     (ii)  West Providence Township
    24         (A)  Acquisition and construction of
    25             Everett Business Center                     1,500,000
    26  (6)  Berks County
    27     (i)  County projects
    28         (A)  Carpenter Technology, expansion
    29             project, for construction,
    30             infrastructure improvements and other
    20070H1589B2829                 - 82 -     

     1             related costs for a manufacturing and
     2             economic development project               27,000,000
     3         (B)  LAND ACQUISITION, INFRASTRUCTURE                      <--
     4             IMPROVEMENTS AND CONSTRUCTION NECESSARY
     5             TO MAINTAIN THE COMPETITIVE POSITION OF
     6             AN EXISTING BUSINESS ENTITY OR FOR THE
     7             DEVELOPMENT OF BUSINESS-READY SITES FOR
     8             POTENTIAL BUSINESS TENANTS                  1,000,000
     9     (II)  BERN TOWNSHIP
    10         (A)  ACQUISITION, INFRASTRUCTURE
    11             IMPROVEMENTS AND CONSTRUCTION OF THE
    12             READING REGIONAL AIRPORT BIOTECH
    13             RESEARCH INDUSTRIAL PARK                    5,000,000
    14     (III)  CITY OF READING
    15         (A)  INFRASTRUCTURE IMPROVEMENTS AND
    16             CONSTRUCTION, INCLUDING PARKING, FOR
    17             CEDARPAK                                    5,000,000
    18         (B)  CONSTRUCTION OF BERKS COMMUNITY
    19             FOUNDATION GREEN OFFICE BUILDING AT 3RD
    20             AND WASHINGTON STREETS                      5,300,000
    21         (C)  INFRASTRUCTURE IMPROVEMENTS AND
    22             CONSTRUCTION OF THE ANGELICA
    23             ENVIRONMENTAL CENTER                        3,800,000
    24         (D)  INFRASTRUCTURE IMPROVEMENTS AND
    25             CONSTRUCTION OF CITY PARK RECREATIONAL
    26             FACILITIES                                  2,750,000
    27         (E)  INFRASTRUCTURE IMPROVEMENTS,
    28             RENOVATIONS AND CONSTRUCTION OF THE
    29             READING PAGODA                              2,500,000
    30         (F)  ACQUISITION, INFRASTRUCTURE
    20070H1589B2829                 - 83 -     

     1             IMPROVEMENTS AND CONSTRUCTION FOR
     2             SECURITY SYSTEM                             1,000,000
     3         (G)  ACQUISITION, INFRASTRUCTURE
     4             IMPROVEMENTS AND CONSTRUCTION FOR THE
     5             REDEVELOPMENT OF LAND AND PROPERTIES ON
     6             THE EAST SIDE OF THE SCHUYLKILL RIVER       5,000,000
     7         (H)  ACQUISITION, INFRASTRUCTURE
     8             IMPROVEMENTS AND CONSTRUCTION FOR THE
     9             REHABILITATION AND DEVELOPMENT OF NORTH
    10             READING INDUSTRIAL TRACT                   30,000,000
    11         (I)  INFRASTRUCTURE IMPROVEMENTS AND
    12             CONSTRUCTION OF A NEW SCIENCE CENTER
    13             FOR ALBRIGHT COLLEGE                        7,000,000
    14         (J)  ACQUISITION, DEMOLITION AND
    15             CONSTRUCTION OF BUTTONWOOD, MILTMORE,
    16             GORDON AND TULPEHOCKEN STREETS
    17             TOWNHOUSE PROJECT                           8,000,000
    18         (K)  ACQUISITION, INFRASTRUCTURE
    19             IMPROVEMENTS AND CONSTRUCTION FOR
    20             RENOVATIONS OF BUILDINGS IN THE 400
    21             BLOCK OF PENN STREET                        3,000,000
    22         (L)  INFRASTRUCTURE IMPROVEMENTS AND
    23             CONSTRUCTION TO CONVERT THE LIBERTY
    24             FIRE COMPANY TO THE READING AREA
    25             FIREFIGHTERS MUSEUM                         1,565,000
    26         (M)  INFRASTRUCTURE IMPROVEMENTS AND
    27             CONSTRUCTION OF A NEW ENTRANCE TO
    28             ALVERNIA COLLEGE                            2,500,000
    29         (N)  INFRASTRUCTURE IMPROVEMENTS AND
    30             CONSTRUCTION FOR AN ADDITION TO THE
    20070H1589B2829                 - 84 -     

     1             ALVERNIA COLLEGE HEALTH AND WELLNESS
     2             CENTER                                      6,000,000
     3         (O)  INFRASTRUCTURE IMPROVEMENTS AND
     4             CONSTRUCTION FOR ANGELICA PARK ACCESS
     5             AND FIELD AND BUILDINGS REHABILITATION
     6             PROJECT                                     4,000,000
     7         (P)  INFRASTRUCTURE IMPROVEMENTS AND
     8             CONSTRUCTION OF READING AREA COMMUNITY
     9             COLLEGE ACADEMIC CLASSROOM
    10             INSTRUCTIONAL CENTER                       20,000,000
    11         (Q)  INFRASTRUCTURE IMPROVEMENTS FOR
    12             READING HOSPITAL, INCLUDING EQUIPMENT
    13             UPGRADES                                   10,000,000
    14         (R)  ACQUISITION, INFRASTRUCTURE
    15             IMPROVEMENTS AND CONSTRUCTION FOR
    16             REDEVELOPMENT OF THE FORMER GARDEN
    17             STATE TANNING BUILDING                      4,500,000
    18         (S)  INFRASTRUCTURE IMPROVEMENTS AND
    19             CONSTRUCTION OF THE FIRST ENERGY
    20             STADIUM                                    26,000,000
    21         (T)  ACQUISITION, DEMOLITION,
    22             INFRASTRUCTURE IMPROVEMENTS AND
    23             CONSTRUCTION OF APARTMENTS AND SHOPS AT
    24             3RD AND COURT STREETS                       7,000,000
    25         (U)  ACQUISITION, INFRASTRUCTURE
    26             IMPROVEMENTS AND CONSTRUCTION OF
    27             CONVENTION CENTER HOTEL AND PARKING
    28             GARAGE                                     62,000,000
    29         (V)  ACQUISITION, INFRASTRUCTURE
    30             IMPROVEMENTS AND CONSTRUCTION FOR THE
    20070H1589B2829                 - 85 -     

     1             EXPANSION OF GOGGLE WORKS NO. 2
     2             BUILDING FOR A CHILDREN'S MUSEUM AND
     3             SCHOOL FOR THE ARTS                         7,000,000
     4         (W)  ACQUISITION, INFRASTRUCTURE
     5             IMPROVEMENTS AND CONSTRUCTION OF 7TH
     6             AND PENN STREETS OFFICE BUILDING            6,000,000
     7         (X)  ACQUISITION, DEMOLITION,
     8             INFRASTRUCTURE IMPROVEMENTS AND
     9             CONSTRUCTION OF SOUTH 8TH STREET
    10             SUPERMARKET AND RETAIL SHOP COMPLEX         1,000,000
    11         (Y)  INFRASTRUCTURE IMPROVEMENTS AND
    12             CONSTRUCTION FOR RESTORATION AND
    13             RENOVATION OF TREXLER MANSION FOR
    14             DANIEL TORRES HISPANIC CENTER               3,000,000
    15         (Z)  ACQUISITION, INFRASTRUCTURE
    16             IMPROVEMENTS, CONSTRUCTION AND OTHER
    17             COSTS ASSOCIATED WITH THE BUTTONWOOD
    18             STREET BROWNFIELD REHABILITATION
    19             PROJECT                                     2,000,000
    20         (AA)  INFRASTRUCTURE IMPROVEMENTS AND
    21             RENOVATION FOR THE READING PUBLIC
    22             MUSEUM                                      2,500,000
    23     (IV)  HAMBURG BOROUGH
    24         (A)  CONSTRUCTION AND RELATED
    25             INFRASTRUCTURE FOR THE HAMBURG AREA
    26             HIGH SCHOOL STADIUM PROJECT                   500,000
    27     (V)  KUTZTOWN BOROUGH
    28         (A)  INFRASTRUCTURE IMPROVEMENTS AND
    29             CONSTRUCTION FOR SECURITY UPGRADES FOR
    30             THE BOROUGH, INCLUDING PARTS OF
    20070H1589B2829                 - 86 -     

     1             KUTZTOWN UNIVERSITY CAMPUS                  2,000,000
     2     (VI)  TOPTON BOROUGH
     3         (A)  INFRASTRUCTURE IMPROVEMENTS AND
     4             CONSTRUCTION FOR THE RENOVATION AND
     5             EXPANSION OF TOPTON BOROUGH HALL            1,500,000
     6     (VII)  WEST READING BOROUGH
     7         (A)  LAND ACQUISITION AND CONSTRUCTION OF A
     8             NEW BOARDWALK TRAIL AT WEST SHORE
     9             BOARDWALK                                   5,000,000
    10  (7)  Blair County
    11     (i)  County projects (Reserved)
    12     (II)  ALTOONA BLAIR COUNTY DEVELOPMENT                         <--
    13         CORPORATION
    14         (A)  ACQUISITION, CONSTRUCTION AND
    15             REDEVELOPMENT OF DOWNTOWN ALTOONA IN
    16             THE VICINITY OF THE AMTRAIN INTERMODAL
    17             FACILITY                                    5,000,000
    18         (B)  ACQUISITION, INFRASTRUCTURE,
    19             CONSTRUCTION AND OTHER COSTS RELATED TO
    20             THE DEVELOPMENT OF A MULTIFUNCTIONAL
    21             COMPLEX LOCATED AT THE SOUTH ALTOONA
    22             BUSINESS PARK                               5,500,000
    23         (C)  LAND ACQUISITION, INFRASTRUCTURE AND
    24             CONSTRUCTION OF ACCESS IMPROVEMENTS TO
    25             SUPPORT THE REDEVELOPMENT OF THE FORMER
    26             HOLLIDAYSBURG CAR SHOP PROPERTY             2,500,000
    27         (D)  ACQUISITION, INFRASTRUCTURE AND
    28             CONSTRUCTION OF THE KETTLE CREEK MIXED-
    29             USE DEVELOPMENT IN LOGAN TOWNSHIP           5,000,000
    30         (E)  LAND ACQUISITION, INFRASTRUCTURE,
    20070H1589B2829                 - 87 -     

     1             ENVIRONMENTAL CLEANUP, DESIGN AND
     2             CONSTRUCTION OF A BUSINESS PARK ALONG
     3             THE I-99 CORRIDOR                           4,000,000
     4         (F)  ACQUISITION, INFRASTRUCTURE,
     5             CONSTRUCTION AND REDEVELOPMENT OF A
     6             MULTIFUNCTIONAL COMPLEX LOCATED ALONG
     7             THE I-99 CORRIDOR WITH EMPHASIS ON THE
     8             I-99 ENTERPRISE CAMPUS SITE                 4,000,000
     9         (G)  LAND ACQUISITION, INFRASTRUCTURE,
    10             REDEVELOPMENT AND CONSTRUCTION OF A
    11             TRANSPORTATION RESEARCH AND EDUCATION
    12             CENTER OF EXCELLENCE COMPLEX ALONG THE
    13             I-99 CORRIDOR                               5,000,000
    14     (ii) (III)  City of Altoona                                    <--
    15         (A)  Acquisition, construction and
    16             infrastructure related to the
    17             renovation of Mishler Theatre               2,100,000
    18         (B)  LAND ACQUISITION, DESIGN AND                          <--
    19             CONSTRUCTION OF A PARKING GARAGE AND
    20             TRANSPORTATION CENTER                       5,000,000
    21     (iii) (IV)  Logan Township                                     <--
    22         (A)  Acquisition, construction,
    23             infrastructure and other costs related
    24             to the redevelopment of Kettle Creek
    25             Mixed-Use Development                       5,000,000
    26  (8)  Bradford County (Reserved)
    27  (9)  Bucks County
    28     (i)  County projects (Reserved)                                <--
    29     (I)  COUNTY PROJECTS                                           <--
    30         (A)  ACQUISITION AND DEMOLITION OF FLOOD-
    20070H1589B2829                 - 88 -     

     1             DAMAGED PROPERTIES IN THE OAK TREE
     2             SECTION OF BRISTOL TOWNSHIP                   500,000
     3         (B)  RENOVATIONS, CONSTRUCTION AND
     4             EXPANSION OF THE HISTORIC MERCER
     5             MUSEUM, BUCKS COUNTY HISTORICAL
     6             SOCIETY                                     5,000,000
     7         (C)  ACQUISITION, RENOVATIONS, CONSTRUCTION
     8             AND OTHER RELATED COSTS FOR THE
     9             REHABILITATION AND EXPANSION OF THE
    10             NETWORK OF VICTIM ASSISTANCE (NOVA)
    11             HEADQUARTERS IN JAMISON                     1,000,000
    12         (D)  REHABILITATION AND CONSTRUCTION OF A
    13             HEALTH CARE AND DIAGNOSTIC CENTER           4,000,000
    14     (ii)  Bensalem Township
    15         (A)  Renovation of the Mack Park recreation
    16             complex, including construction               250,000
    17         (B)  INFRASTRUCTURE, CONSTRUCTION AND OTHER                <--
    18             RELATED COSTS FOR RENOVATIONS OF THE
    19             BENSALEM EMERGENCY MEDICAL SERVICES
    20             HEADQUARTERS                                1,000,000
    21     (iii)  Bristol Borough
    22         (A)  Construction, infrastructure and other
    23             related costs for parking facilities        3,000,000
    24         (B)  Construction, infrastructure and other
    25             related costs for waterfront
    26             development                                 2,000,000
    27         (C)  Acquisition, construction,
    28             infrastructure and other related costs
    29             for waterfront development along the
    30             Delaware River                              2,000,000
    20070H1589B2829                 - 89 -     

     1         (D)  Acquisition, construction,
     2             infrastructure and other related costs
     3             for Elm and Chestnut Streets
     4             redevelopment                               2,500,000
     5     (iv)  Bristol Township
     6         (A)  Infrastructure, redevelopment and
     7             other related costs to convert the
     8             Lower Bucks Hospital to a full
     9             telemetry-based hospital                    1,000,000
    10         (B)  Infrastructure, redevelopment and
    11             other related costs for Lower Bucks
    12             Hospital security upgrades and
    13             bioterrorism training                         575,000
    14         (C)  Construction, infrastructure and other
    15             related costs to rebuild the Lower
    16             Bucks Hospital Patient Unit 4F              3,000,000
    17         (D)  Infrastructure, redevelopment and
    18             other related costs to purchase three
    19             portable orthopedic X-ray machines for
    20             Lower Bucks Hospital                          420,000
    21         (E)  Construction, infrastructure and other
    22             related costs for the renovation of the
    23             Bristol Township municipal building         8,000,000
    24         (F)  Infrastructure, redevelopment and
    25             other related costs to build a Lower
    26             Bucks Hospital vascular lab                 2,000,000
    27         (G)  Infrastructure, redevelopment and
    28             other related costs for safety and code
    29             upgrades for Lower Bucks Hospital           2,500,000
    30         (H)  Infrastructure, redevelopment and
    20070H1589B2829                 - 90 -     

     1             other related costs to purchase a 64-
     2             slice CT scanner for Lower Bucks
     3             Hospital                                    2,500,000
     4         (I)  Infrastructure, redevelopment and
     5             other related costs to purchase two
     6             digital mammography systems for Lower
     7             Bucks Hospital                                725,000
     8         (J)  Infrastructure, redevelopment and
     9             other related costs to purchase
    10             Computerized Physician Order Entry
    11             (CPOE)systems for Lower Bucks Hospital      1,500,000
    12     (v)  Chalfont Borough
    13         (A)  Acquisition and construction for
    14             Chalfont Firehouse                            500,000
    15         (B)  Acquisition, construction,
    16             infrastructure and other costs related
    17             to the expansion of The Children's
    18             Hospital of Philadelphia Specialty Care
    19             and Ambulatory Surgery Center                 500,000
    20     (V.1)  DOYLESTOWN TOWNSHIP                                     <--
    21         (A)  RENOVATIONS AND CONSTRUCTION OF A NEW
    22             EMERGENCY DEPARTMENT AT THE DOYLESTOWN
    23             HOSPITAL                                   30,000,000
    24     (vi)  Falls Township
    25         (A)  Construction and other related costs
    26             for the Falls Township Senior Citizen
    27             Center                                      1,000,000
    28         (B)  Acquisition, construction,
    29             infrastructure and other related costs
    30             for the YMCA Community Center at Snipes
    20070H1589B2829                 - 91 -     

     1             Farm                                        4,000,000
     2     (vii)  Hamburg Borough                                         <--
     3         (A)  Construction and related
     4             infrastructure for the Hamburg Area
     5             High School Stadium Project                   500,000
     6     (viii)  Hilltown Township
     7         (A)  Construction and restoration of Pearl
     8             S. Buck House                               1,000,000
     9     (VIII.1)  HULMEVILLE BOROUGH                                   <--
    10         (A)  RENOVATIONS AND EXPANSION OF THE
    11             WILLIAM PENN FIRE COMPANY SUBSTATION          500,000
    12     (ix)  Langhorne Borough
    13         (A)  Expansion and renovation of St. Mary's
    14             Hospital, including construction            1,000,000
    15     (x)  Middletown Township
    16         (A)  Construction and other related costs
    17             for the Middletown Community Center         1,500,000
    18     (xi)  Nockamixon Township
    19         (A)  Renovation of Central Bucks Senior
    20             Center, including construction and
    21             related infrastructure                         60,000
    22     (xii)  Sellersville Borough
    23         (A)  Construction of the Recovery Center at
    24             Penn Foundation, including related
    25             infrastructure costs                        1,000,000
    26     (xiii)  Warrington Township
    27         (A)  Construction of West End Fire Station,
    28             including related infrastructure              500,000
    29     (XIV)  QUAKERTOWN BOROUGH                                      <--
    30         (A)  CONSTRUCTION AND REHABILITATION OF
    20070H1589B2829                 - 92 -     

     1             UPPER BUCKS YMCA                            2,000,000
     2  (10)  Butler County
     3     (i)  County projects
     4         (A)  COMMUNITY DEVELOPMENT CORPORATION OF                  <--
     5             BUTLER COUNTY
     6             (I)  ACQUISITION, INFRASTRUCTURE,
     7                 CONSTRUCTION AND DEVELOPMENT OF THE
     8                 BUFFALO TOWNSHIP BUSINESS AND
     9                 TECHNOLOGY PARK, LOCATED ON A 40-
    10                 ACRE PARCEL OF LAND AT THE
    11                 INTERSECTION OF ROUTE 28 AND ROUTE
    12                 356                                     1,500,000
    13             (II)  INFRASTRUCTURE, CONSTRUCTION AND
    14                 RENOVATION OF THE FORMER PULLMAN
    15                 STANDARD OFFICE BUILDING FOR USE AS
    16                 A MULTITENANT, MIXED-USE FACILITY       3,000,000
    17             (III)  ACQUISITION, INFRASTRUCTURE,
    18                 CONSTRUCTION AND REDEVELOPMENT OF A
    19                 20-ACRE PARCEL OF BROWNFIELD LAND
    20                 IN THE FORMER JET FUEL ADDITIVE
    21                 FACILITY IN FORWARD TOWNSHIP            1,000,000
    22         (B)  RENOVATIONS AND CONSTRUCTION OF THE
    23             CENTRAL HISTORICAL MUSEUM AND
    24             PRESERVATION OF SEVERAL OTHER
    25             HISTORICAL PROPERTIES                       2,000,000
    26         (C)  CONSTRUCTION OF THE ALAMEDA SPORTS AND
    27             EXHIBITION COMPLEX                          4,000,000
    28         (D)  INFRASTRUCTURE, DEVELOPMENT AND
    29             CONSTRUCTION OF A NEW ARTS AND CULTURAL
    30             CENTER ON THE BUTLER COUNTY COMMUNITY
    20070H1589B2829                 - 93 -     

     1             COLLEGE CAMPUS IN BUTLER TOWNSHIP           6,600,000
     2         (A) (E)  Acquisition, construction,                        <--
     3             infrastructure and other related costs
     4             for a new inpatient facility at Butler
     5             Memorial Hospital                          20,000,000
     6     (ii)  City of Butler
     7         (A)  Construction and related costs for
     8             redevelopment of downtown district,
     9             including related infrastructure            6,000,000
    10         (B)  Acquisition and development of former
    11             Pullman Standard Office Building for
    12             use as a multi-tenant facility              3,000,000
    13     (iii)  Buffalo Township
    14         (A)  Acquisition, construction and related
    15             infrastructure for Business and
    16             Technology Park                             1,500,000
    17     (iv)  Butler Township
    18         (A)  Construction of Butler Crossing
    19             project, including related
    20             infrastructure                              6,000,000
    21     (v)  Forward Township
    22         (A)  Acquisition and construction of
    23             business park, including related
    24             infrastructure                              1,000,000
    25  (11)  Cambria County
    26     (i)  County projects (Reserved)
    27     (ii)  City of Johnstown
    28         (A)  Acquisition, construction,
    29             infrastructure and other related costs
    30             for brownfield redevelopment including
    20070H1589B2829                 - 94 -     

     1             Festival Park                               5,000,000
     2         (B)  Acquisition, construction,
     3             infrastructure and other related costs
     4             for downtown housing redevelopment          5,000,000
     5         (C)  Acquisition, construction,
     6             infrastructure and other related costs
     7             for Greater Johnstown YMCA
     8             redevelopment including a community
     9             center                                      5,000,000
    10         (D)  ACQUISITION, INFRASTRUCTURE                           <--
    11             IMPROVEMENTS AND CONSTRUCTION FOR THE
    12             GREATER JOHNSTOWN REGIONAL TECH PARK,
    13             PHASES II AND III                           7,000,000
    14     (iii)  Richland Township
    15         (A)  Acquisition, construction,
    16             infrastructure and other related costs
    17             for the East Hills redevelopment
    18             including a recreation center               7,000,000
    19  (12)  Cameron County (Reserved)
    20  (13)  Carbon County
    21     (i)  County projects (Reserved)                                <--
    22     (I)  COUNTY PROJECTS                                           <--
    23         (A)  LAND ACQUISITION, INFRASTRUCTURE
    24             IMPROVEMENTS AND CONSTRUCTION NECESSARY
    25             TO MAINTAIN THE COMPETITIVE POSITION OF
    26             AN EXISTING BUSINESS ENTITY OR FOR THE
    27             DEVELOPMENT OF BUSINESS-READY SITES FOR
    28             POTENTIAL BUSINESS TENANTS                  1,000,000
    29     (II)  JIM THORPE
    30         (A)  RENOVATIONS FOR THE CARBON COUNTY
    20070H1589B2829                 - 95 -     

     1             COURTHOUSE                                    500,000
     2         (B)  RENOVATIONS FOR THE CARBON COUNTY
     3             COURTHOUSE ANNEX                              300,000
     4     (II.1)  MAHONING TOWNSHIP
     5         (A)  CONSTRUCTION, REDEVELOPMENT AND OTHER
     6             RELATED COSTS FOR THE MAHONING TOWNSHIP
     7             MUNICIPAL BUILDING                            750,000
     8     (III)  MAHONING AND LEHIGHTON
     9         (A)  INFRASTRUCTURE IMPROVEMENTS,
    10             DEVELOPMENT AND RELATED COSTS FOR THE
    11             PACKERTON YARDS INDUSTRIAL PARK             3,000,000
    12     (ii) (IV)  Palmerton Borough                                   <--
    13         (A)  Construction, infrastructure and other
    14             related costs for the regional Wall
    15             Street West Initiative                     25,000,000
    16     (iii) (V)  Weatherly Borough                                   <--
    17         (A)  Acquisition, construction,
    18             infrastructure and other related costs
    19             for the railroad/steel revitalization
    20             project                                     1,500,000
    21  (14)  Centre County
    22     (i)  County projects
    23         (A)  Construction, infrastructure and other
    24             related costs for the expansion of CPI
    25             Workforce Development                       1,000,000
    26         (B)  Construction, infrastructure and other
    27             related costs for a new biofuels plant     25,000,000
    28         (C)  Construction, infrastructure and other
    29             related costs for the Phillipsburg
    30             Borough Hall                                2,000,000
    20070H1589B2829                 - 96 -     

     1         (D)  Acquisition, construction and other
     2             related costs for the Hope and Reliance
     3             United Firefighter Center                   1,000,000
     4         (E)  Acquisition, construction,
     5             infrastructure and other related costs
     6             for the Centre County Recreation
     7             Center                                     20,000,000
     8         (F)  Construction, infrastructure and other
     9             related costs for the Moshannon Valley
    10             Economic Partnership Industrial Park        1,000,000
    11         (G)  INFRASTRUCTURE, CONSTRUCTION AND OTHER                <--
    12             RELATED COSTS FOR THE REDEVELOPMENT AND
    13             EXPANSION OF THE COLONNADE SHOPPING
    14             CENTER                                      5,000,000
    15         (H)  ACQUISITION OF A 20-ACRE PARCEL OF
    16             LAND, SITE DEVELOPMENT AND CONSTRUCTION
    17             OF FACILITIES, INCLUDING TRANSPORTATION
    18             AND MEDICAL ARTS TRAINING CENTERS           5,000,000
    19         (I)  ACQUISITION, CONSTRUCTION,
    20             INFRASTRUCTURE AND OTHER RELATED COSTS
    21             FOR CENTRE COUNTY PAWS                        350,000
    22     (I.1)  BELLEFONTE BOROUGH
    23         (A)  ACQUISITION, INFRASTRUCTURE
    24             IMPROVEMENTS AND CONSTRUCTION FOR
    25             COUNTY SEAT PARKING AND TRANSIT
    26             FACILITY                                    2,500,000
    27     (ii)  Centre Hall Borough
    28         (A)  Acquisition, construction,
    29             infrastructure and other related costs
    30             for the Grange Fair Multipurpose
    20070H1589B2829                 - 97 -     

     1             Complex                                       750,000
     2     (iii)  State College Borough
     3         (A)  Acquisition, construction,
     4             infrastructure and other related costs
     5             for a downtown redevelopment project       12,000,000
     6  (15)  Chester County
     7     (i)  County projects
     8         (A)  Construction, acquisition and related
     9             infrastructure for the Southeastern
    10             Chester County Refuse Authority               550,000
    11     (ii)  Downingtown Borough
    12         (A)  Acquisition, construction,
    13             infrastructure and other related costs
    14             for River Station Downingtown
    15             Redevelopment                               9,500,000
    16         (B)  INFRASTRUCTURE IMPROVEMENTS AND                       <--
    17             CONSTRUCTION OF PEDESTRIAN AND BIKE
    18             PATH SYSTEM ALONG THE BRANDYWINE CREEK
    19             CONNECTING TO THE STRUBLE TRAIL               500,000
    20     (II.1)  MALVERN BOROUGH AND EAST WHITELAND
    21         TOWNSHIP
    22         (A)  INFRASTRUCTURE IMPROVEMENTS,
    23             RENOVATIONS AND CONSTRUCTION FOR THE
    24             BISHOP TUBE COMPLEX                         2,500,000
    25     (II.2)  MALVERN BOROUGH
    26         (A)  INFRASTRUCTURE AND CONSTRUCTION OF THE
    27             MALVERN FIRE COMPANY BUILDING                 500,000
    28     (II.3)  PHOENIXVILLE BOROUGH
    29         (A)  PHOENIXVILLE LIBRARY EXPANSION AND
    30             CONSTRUCTION OF A NEW FACILITY              1,000,000
    20070H1589B2829                 - 98 -     

     1     (iii)  Schuylkill Township
     2         (A)  Expansion of the Phoenixville YMCA,
     3             including construction                      3,000,000
     4     (IV)  SPRING CITY BOROUGH                                      <--
     5         (A)  SPRING CITY LIBRARY EXPANSION AND
     6             CONSTRUCTION OF A NEW FACILITY              1,200,000
     7     (V)  SOUTH COATESVILLE BOROUGH AND EAST
     8         FALLOWFIELD TOWNSHIP
     9         (A)  INFRASTRUCTURE IMPROVEMENTS AND
    10             CONSTRUCTION OF CHESTER COUNTY FIRE-
    11             POLICE TRAINING FACILITY                    2,000,000
    12     (VI)  WEST BRADFORD TOWNSHIP
    13         (A)  INFRASTRUCTURE IMPROVEMENTS AND
    14             CONSTRUCTION OF A NEW ANIMAL SHELTER
    15             AND MEDICAL FACILITY                        1,000,000
    16     (VI.1)  WEST CHESTER
    17         (A)  CHESTER COUNTY HISTORICAL SOCIETY,
    18             BUILDING RENOVATION IMPROVEMENTS,
    19             INCLUDING CONSTRUCTION AND OTHER
    20             RELATED COSTS                               1,000,000
    21     (VII)  WEST CHESTER BOROUGH AND WEST GOSHEN
    22         TOWNSHIP
    23         (A)  INFRASTRUCTURE IMPROVEMENTS AND
    24             CONSTRUCTION OF A CARDIOVASCULAR CENTER
    25             AT CHESTER COUNTY HOSPITAL                 10,000,000
    26     (VIII)  WEST PIKELAND TOWNSHIP
    27         (A)  RENOVATIONS TO THE HISTORIC WASHINGTON
    28             BUILDING AT HISTORIC YELLOW SPRINGS,
    29             INCLUDING INFRASTRUCTURE IMPROVEMENTS
    30             AND CONSTRUCTION                              750,000
    20070H1589B2829                 - 99 -     

     1     (IX)  WILLISTOWN TOWNSHIP
     2         (A)  INFRASTRUCTURE IMPROVEMENTS AND
     3             CONSTRUCTION OF A NATURE AND COMMUNITY
     4             CENTER ON WILLISTOWN'S OKEHOCKING
     5             PRESERVE                                    1,000,000
     6  (16)  Clarion County
     7     (i)  County projects (Reserved)                                <--
     8     (I)  COUNTY PROJECTS                                           <--
     9         (A)  INFRASTRUCTURE, CONSTRUCTION,
    10             REDEVELOPMENT AND OTHER RELATED COSTS
    11             FOR THE CONSTRUCTION OF A RESERVOIR/DAM
    12             TO PROVIDE AN ALTERNATE WATER SUPPLY
    13             FOR THE BEAVER CREEK KEYSTONE
    14             INNOVATION ZONE                               100,000
    15         (B)  INFRASTRUCTURE, CONSTRUCTION,
    16             REHABILITATION AND OTHER RELATED COSTS
    17             FOR IMPROVEMENTS TO A WATER SUPPLY THAT
    18             SERVES THE CLARION COUNTY COMMERCE
    19             CENTER KEYSTONE OPPORTUNITY ZONE AND
    20             THE KNOX INDUSTRIAL PARK                      375,000
    21         (C)  REDEVELOPMENT AND CONSTRUCTION OF
    22             INCUBATOR SPACE WITHIN THE CLARION
    23             UNIVERSITY BIOTECHNOLOGY BUSINESS
    24             DEVELOPMENT CENTER AND INCUBATOR
    25             FACILITY LOCATED IN THE TRINITY POINT
    26             TECHNOLOGY PARK                               850,000
    27     (ii)  Foxburg Borough
    28         (A)  Site development and construction of
    29             Municipal Center Building to support
    30             downtown revitalization                     3,000,000
    20070H1589B2829                 - 100 -    

     1     (III)  CLARION BOROUGH                                         <--
     2         (A)  INFRASTRUCTURE AND CONSTRUCTION OF A
     3             SIDEWALK ALONG GREENVILLE AVENUE FROM
     4             RHEINHARD VILLAGE TO CLARION
     5             UNIVERSITY                                    500,000
     6     (iii) (IV)  Clarion Township                                   <--
     7         (A)  Site development and construction of
     8             Clarion County YMCA facility, including
     9             land acquisition and related
    10             infrastructure                              3,500,000
    11  (17)  Clearfield County
    12     (i)  County projects
    13         (A)  Construction and other related costs
    14             for the Wood Pellet Mill project            1,000,000
    15         (B)  Construction and other costs
    16             associated with the Biomass Conversion
    17             Center of Excellence                        2,750,000
    18         (C)  Construction, infrastructure and other
    19             costs related to coal gasification
    20             project                                    20,000,000
    21         (D)  EXPANSION OF FACILITIES TO ACCOMMODATE                <--
    22             HEALTH INFORMATION TECHNOLOGY (HIT) AND
    23             WESTERN PA HEALTH INFORMATION
    24             CONNECTION (HIC), INCLUDING
    25             CONSTRUCTION OF A NEW 10,000-SQUARE-
    26             FOOT BUILDING AND ASSOCIATED
    27             INFRASTRUCTURE IMPROVEMENTS AT DUBOIS
    28             REGIONAL MEDICAL CENTER                       875,000
    29     (ii)  Clearfield Borough
    30         (A)  Acquisition, construction,
    20070H1589B2829                 - 101 -    

     1             infrastructure and other related costs
     2             for riverfront development                  6,000,000
     3         (B)  Construction, infrastructure and other
     4             related costs for a riverwalk, park
     5             revitalization and fish ladder along
     6             the Susquehanna River                       2,500,000
     7         (C)  Construction, infrastructure and other
     8             related costs for business district
     9             parking facilities                          5,000,000
    10         (D)  CONSTRUCTION OF A NEW CENTER FOR                      <--
    11             PERFORMING ARTS AS PART OF THE DOWNTOWN
    12             CLEARFIELD REVITALIZATION, INCLUDING
    13             LAND ACQUISITION AND INFRASTRUCTURE
    14             IMPROVEMENTS                                2,000,000
    15         (E)  CONSTRUCTION AND INFRASTRUCTURE
    16             IMPROVEMENTS FOR THE DEVELOPMENT OF THE
    17             CLEARFIELD RENEWABLE ENERGY DISTRICT        5,000,000
    18         (F)  DOWNTOWN REDEVELOPMENT, INCLUDING
    19             PEDESTRIAN ENHANCEMENTS NECESSARY TO
    20             IMPLEMENT A STRATEGY TO ENCOURAGE
    21             BUSINESS AND GOVERNMENTAL ENTITIES TO
    22             RELOCATE TO THE BOROUGH                     5,000,000
    23         (G)  CONSTRUCTION OF A NEW CENTRALIZED
    24             FIREHOUSE TO SUPPORT THE CONSOLIDATION
    25             OF FOUR EXISTING FIRE DEPARTMENTS,
    26             INCLUDING LAND ACQUISITION AND
    27             INFRASTRUCTURE IMPROVEMENTS                 1,500,000
    28         (H)  CONSTRUCTION OF A 300-SPACE PARKING
    29             FACILITY TO BE LOCATED NEAR THE
    30             CLEARFIELD COUNTY COURTHOUSE, INCLUDING
    20070H1589B2829                 - 102 -    

     1             LAND ACQUISITION AND INFRASTRUCTURE
     2             IMPROVEMENTS                                5,000,000
     3         (I)  CLEARFIELD HOSPITAL IMAGING DEPARTMENT
     4             IMPROVEMENTS, INCLUDING ACQUISITION OF
     5             A 1.5T HIGH FIELD STRENGTH SHORT BORE
     6             MRI, BREAST MRI COMPUTER AIDED
     7             DETECTION SYSTEM, DUAL HEALD NUCLEAR
     8             MEDICINE CAMERA AND FULL BODY AXIAL FAN
     9             BEAM BONE DENSITOMETER                      1,045,000
    10         (J)  RENOVATION AND EXPANSION OF THE
    11             EMERGENCY DEPARTMENT OF CLEARFIELD
    12             HOSPITAL TO INCREASE CAPACITY FROM 12
    13             BEDS TO 24 BEDS                             1,750,000
    14     (iii)  Curwensville Borough
    15         (A)  Infrastructure and other costs related
    16             to building the Sunnyside Ethanol
    17             Manufacturing Plant                         5,000,000
    18     (iv)  Karthous Township
    19         (A)  Construction, infrastructure and other
    20             costs associated with the River Hill
    21             Power Waste Coal Fired Power Plant         15,000,000
    22     (v)  Lawrence Township
    23         (A)  Construction and other related costs
    24             for a BioEnergy Ethanol Plant               5,000,000
    25  (18)  Clinton County
    26     (i)  County projects
    27         (A)  Acquisition, construction and other
    28             related costs for the Beech Creek
    29             Watershed project                           5,000,000
    30         (B)  Construction and other related costs
    20070H1589B2829                 - 103 -    

     1             for the Annie Halenbake Ross Library
     2             and Renovo Library                          1,000,000
     3         (C)  Acquisition, construction,
     4             infrastructure and other related costs
     5             for the Susquehanna River Corridor          2,000,000
     6         (D)  CONSTRUCTION, ACQUISITION,                            <--
     7             REDEVELOPMENT AND OTHER COSTS RELATED
     8             TO THE BUCKTAIL MEDICAL CENTER                250,000
     9         (E)  CONSTRUCTION, INFRASTRUCTURE OTHER
    10             RELATED COSTS FOR THE LAMAR TOWNSHIP
    11             BUSINESS PARK ACCESS IMPROVEMENT
    12             PROJECT                                     7,500,000
    13     (ii)  City of Lock Haven
    14         (A)  Construction, infrastructure and other
    15             costs associated with the Downtown
    16             Streetscape improvement project             1,250,000
    17         (B)  Construction and other related costs
    18             for the First Quality Products
    19             Manufacturing Facility                      1,000,000
    20     (iii)  Mill Hall Borough
    21         (A)  Acquisition, construction and other
    22             related costs for Millbrook Playhouse       1,000,000
    23     (III.1)  RENOVO BOROUGH                                        <--
    24         (A)  IMPROVEMENTS TO RAILCAR FACILITY AT
    25             RENOVO INDUSTRIAL PARK TO ENHANCE
    26             PRODUCTION, INCLUDING UTILITY
    27             IMPROVEMENTS, RAIL IMPROVEMENTS AND
    28             BUILDING RENOVATION AND IMPROVEMENTS        3,000,000
    29     (iv)  Wayne Township
    30         (A)  Construction and other related costs
    20070H1589B2829                 - 104 -    

     1             for Zindel Park development and
     2             improvements                                  500,000
     3  (19)  Columbia County (Reserved)
     4  (20)  Crawford County
     5     (i)  County projects (Reserved)                                <--
     6     (I)  COUNTY PROJECTS                                           <--
     7         (A)  RENOVATIONS, REHABILITATION AND OTHER
     8             RELATED COSTS FOR THE RESTORATION OF
     9             THE HISTORIC TARBELL HOUSE LOCATED IN
    10             THE CITY OF TITUSVILLE                        500,000
    11     (ii)  Vernon Township
    12         (A)  Acquisition, construction,
    13             infrastructure and other related costs
    14             for the Crawford County Industrial Park
    15             East                                        2,000,000
    16     (III)  REDEVELOPMENT AUTHORITY OF THE CITY OF                  <--
    17         MEADVILLE
    18         (A)  CONVERSION OF THE TALON 5 FACILITY TO
    19             MARKET FOR COMMERCIAL PURPOSES              3,000,000
    20     (IV)  TITUSVILLE REDEVELOPMENT AUTHORITY
    21         (A)  CONSTRUCTION, RENOVATION,
    22             INFRASTRUCTURE AND REDEVELOPMENT OF THE
    23             TITUSVILLE OPPORTUNITY PARK KEYSTONE
    24             OPPORTUNITY ZONE                            2,000,000
    25  (21)  Cumberland County
    26     (i)  County projects (Reserved)
    27     (II)  BOROUGH OF CARLISLE                                      <--
    28         (A)  CONSTRUCTION OF ADDITION TO BOSLER
    29             LIBRARY                                     2,500,000
    30         (B)  ACQUISITION AND EXPANSION OF CARLISLE
    20070H1589B2829                 - 105 -    

     1             CENTRAL FARMERS MARKET                        750,000
     2     (III)  BOROUGH OF MECHANICSBURG
     3         (A)  ACQUISITION RELATED TO THE
     4             CONSTRUCTION OF A NEW FACILITY FOR THE
     5             MECHANICSBURG ART CENTER                    1,250,000
     6     (ii) (IV)  Shippensburg Township                               <--
     7         (A)  Infrastructure improvements and
     8             construction of Shippensburg Regional
     9             Conference Center                           3,000,000
    10     (iii) (V)  Silver Spring Township                              <--
    11         (A)  Construction, site preparation and
    12             other related costs for a mixed-use
    13             development                                 5,000,000
    14     (iv) (VI)  Upper Allen Township                                <--
    15         (A)  Construction of Rider-Musser mixed-use
    16             development operated by Messiah
    17             College, including related
    18             infrastructure                              7,500,000
    19         (B)  Construction of a regional conference
    20             center at Messiah College, including
    21             related infrastructure                      6,000,000
    22  (22)  Dauphin County
    23     (i)  County projects (Reserved)
    24     (ii)  City of Harrisburg
    25         (A)  Construction and other related costs
    26             for the Pinnacle Health Hospital
    27             Emergency Department                        5,000,000
    28         (B)  Construction, infrastructure and other
    29             related costs for renovation of the
    30             Whitaker Center for Science and the
    20070H1589B2829                 - 106 -    

     1             Arts                                        1,500,000
     2         (C)  CONSTRUCTION AND OTHER COSTS RELATED                  <--
     3             TO THE PENNSYLVANIA LAW ENFORCEMENT
     4             MEMORIAL                                    1,500,000
     5     (iii)  Derry Township
     6         (A)  Acquisition, construction,
     7             infrastructure and other related costs
     8             for the Hershey Area Master Plan           25,000,000
     9     (iv)  Lower Paxton Township
    10         (A)  Construction of Heroes Grove,
    11             including related infrastructure            1,000,000
    12         (B)  Construction and development of the
    13             Thomas B. George Park                       1,000,000
    14     (v)  Swatara Township
    15         (A)  Construction and infrastructure
    16             related to the development of Swatara
    17             Commons                                    10,000,000
    18  (23)  Delaware County
    19     (i)  County projects
    20         (A)  Acquisition and other related costs to
    21             Tri Borough Fire Company Consolidation        500,000
    22         (B)  DELAWARE COUNTY HOUSING AUTHORITY,                    <--
    23             ACQUISITION, INFRASTRUCTURE AND
    24             CONSTRUCTION OF THE FAIRGROUNDS HOUSING
    25             DEVELOPMENT LOCATED NEAR I-95 AND THE
    26             COMMODORE BARRY BRIDGE ON ENGLE STREET      1,500,000
    27         (C)  DELAWARE COUNTY REDEVELOPMENT
    28             AUTHORITY, ACQUISITION, INFRASTRUCTURE,
    29             CONSTRUCTION AND OTHER RELATED COSTS
    30             FOR THE REDEVELOPMENT OF PROPERTIES IN
    20070H1589B2829                 - 107 -    

     1             THE PENN HILLS AREA OF RIDLEY TOWNSHIP      2,000,000
     2     (ii)  City of Chester
     3         (A)  Acquisition, construction,
     4             infrastructure and other related costs
     5             for the downtown revitalization             5,000,000
     6         (B)  CHESTER ECONOMIC DEVELOPMENT AUTHORITY                <--
     7             (I)  CONSTRUCTION OF A NEW PROFESSIONAL
     8                 SPORTS STADIUM IN THE CITY OF
     9                 CHESTER                                45,000,000
    10             (II)  INFRASTRUCTURE IMPROVEMENTS,
    11                 BULKHEAD REPAIRS AND SITE
    12                 PREPARATION FOR ADDITIONAL
    13                 REDEVELOPMENT OF THE WATERFRONT
    14                 AREA IN CONJUNCTION WITH RECENT
    15                 HOUSING AND COMMERCIAL
    16                 REDEVELOPMENT                          18,000,000
    17             (III)  UNIVERSITY CROSSING -
    18                 DEVELOPMENT OF A COMMERCIAL MIXED-
    19                 USE PROJECT WITH A 48-ROOM HOTEL
    20                 AND COMMERCIAL, RETAIL AND OFFICE
    21                 SPACE LOCATED ON INNER CITY LOTS
    22                 ADJACENT TO THE WIDENER UNIVERSITY
    23                 CAMPUS IN THE CITY OF CHESTER             250,000
    24     (II.1)  CHESTER TOWNSHIP
    25         (A)  SITE ACQUISITION, REDEVELOPMENT OF
    26             EXISTING IMPROVEMENTS, CONSTRUCTION,
    27             INFRASTRUCTURE AND RELATED SITE
    28             PREPARATION AND EQUIPPING FOR A
    29             FILM/TELEVISION STUDIO PROJECT AND
    30             RELATED TOURIST FACILITIES                 15,000,000
    20070H1589B2829                 - 108 -    

     1     (iii)  Clifton Heights
     2         (A)  Acquisition and construction of
     3             municipal service building and property
     4             enhancements                                3,000,000
     5     (iv)  Edgemont Township
     6         (A)  Construction of a multipurpose,
     7             professional indoor equestrian arena          500,000
     8     (v)  Glenolden Borough
     9         (A)  Redevelopment and construction related
    10             to the revitalization of various
    11             borough buildings                             500,000
    12     (vi)  Haverford Township
    13         (A)  Construction and other related costs
    14             for the Haverford Township Community
    15             Center                                      8,000,000
    16         (B)  RENOVATIONS AND EXPANSION OF THE MAIN                 <--
    17             LINE ART CENTER                               600,000
    18     (VI.1)  BOROUGH OF MEDIA
    19         (A)  EXPANSION AND RENOVATIONS TO THE
    20             HISTORICAL PENNSYLVANIA VETERANS MUSEUM
    21             FACILITIES                                  3,500,000
    22         (B)  CONSTRUCTION, RENOVATIONS AND
    23             EXPANSION OF THE MEDIA THEATRE
    24             FACILITIES                                    850,000
    25     (vii)  Norwood Borough
    26         (A)  Construction of firehouse and police
    27             station, including facility demolition
    28             and site preparation                        3,000,000
    29     (viii)  Radnor Township
    30         (A)  Construction, infrastructure and
    20070H1589B2829                 - 109 -    

     1             related costs to renovate Woodcrest
     2             Mansion                                     5,000,000
     3     (ix)  Ridley Park Borough
     4         (A)  Redevelopment and construction related
     5             to the revitalization of various
     6             borough buildings                           1,000,000
     7         (B)  Infrastructure improvements and
     8             construction to Taylor Hospital             2,000,000
     9     (x)  Ridley Township
    10         (A)  Construction of new township community                <--
    11             center                                      1,000,000
    12         (B) (A)  Construction, infrastructure and                  <--
    13             other related costs for the Ridley
    14             Township Community Center                   2,000,000
    15     (xi)  Swarthmore Borough
    16         (A)  Construction, acquisition,
    17             infrastructure and other costs related
    18             to the Swarthmore Town Center
    19             Development                                 2,000,000
    20     (xii)  Upper Darby Township
    21         (A)  Construction of public safety
    22             building, including land acquisition
    23             and related costs                           7,000,000
    24         (B)  Construction and abatement of
    25             hazardous materials related to
    26             demolition of 501 Bywood                    2,500,000
    27         (C)  Construction, infrastructure and other
    28             costs related to rehabilitation of St.
    29             Charles Cemetery                            1,000,000
    30  (24)  Elk County (Reserved)                                       <--
    20070H1589B2829                 - 110 -    

     1         (D)  ACQUISITION, REHABILITATION AND                       <--
     2             CONSTRUCTION OF A STATE-OF-THE-ART
     3             PUBLIC SAFETY BUILDING                      6,500,000
     4         (E)  CONSTRUCTION RELATED TO THE
     5             REDEVELOPMENT OF A FORMER WAREHOUSE
     6             FACILITY, INCLUDING NECESSARY COSTS           500,000
     7     (XIII)  MARCUS HOOK BOROUGH
     8         (A)  ACQUISITION, INFRASTRUCTURE AND
     9             CONSTRUCTION OF THE MARCUS HOOK STATION
    10             SQUARE, A HOUSING AND COMMERCIAL SPACE
    11             DEVELOPMENT, LOCATED ADJACENT TO THE
    12             MARCUS HOOK TRAIN STATION AT THE
    13             INTERSECTION OF MARKET AND EAST 10TH
    14             STREETS IN CHESTER TOWNSHIP                 1,000,000
    15     (XIV)  MARPLE TOWNSHIP
    16         (A)  DEMOLITION OF THE TOWNSHIP BUILDING
    17             AND OTHER RELATED COSTS FOR THE
    18             DISPOSAL OF ANY ENVIRONMENTAL HAZARDS         500,000
    19  (24)  ELK COUNTY
    20     (I)  COUNTY PROJECTS (RESERVED)
    21     (II)  CITY OF ST. MARY'S
    22         (A)  IMPACT ST. MARY'S STREETSCAPE AND
    23             INFRASTRUCTURE IMPROVEMENTS, INCLUDING
    24             SIDEWALKS, CURBING, STREETLIGHTS,
    25             STREET TREES, LAWNS AND SIGNAGE TO BE
    26             LOCATED ALONG DEPOT STREET AND ERIE
    27             AVENUE, REPLACEMENT OF THE IRON RUN
    28             BRIDGE AND EXTENSION OF STACKPOLE
    29             STREET TO WASHINGTON STREET                 3,000,000
    30         (B)  REPAIR AND RENOVATION OF THE SKATE
    20070H1589B2829                 - 111 -    

     1             PARK AND SKATE POND, CONSTRUCTION OF
     2             WALKING PATHS AND UPGRADING OF
     3             PLAYGROUND AND PARK EQUIPMENT AT
     4             KAULMONT PARK                               1,000,000
     5     (III)  ST. MARY'S AREA ECONOMIC DEVELOPMENT
     6         CORPORATION
     7         (A)  CONSTRUCTION OF A NEW MEDICAL/SURGICAL
     8             INPATIENT FLOOR, INCLUDING ACQUISITION
     9             OF EQUIPMENT AND ELECTRONIC MEDICAL
    10             RECORDS SYSTEMS FOR ELK REGIONAL HEALTH
    11             CENTER                                      7,500,000
    12  (25)  Erie County
    13     (i)  County projects (Reserved)                                <--
    14     (I)  COUNTY PROJECTS                                           <--
    15         (A)  ERIE-WESTERN PENNSYLVANIA PORT
    16             AUTHORITY
    17             (I)  INFRASTRUCTURE AND CONSTRUCTION OF
    18                 RESTROOMS AND A CONCESSION BUILDING
    19                 WITHIN LIBERTY PARK                     1,500,000
    20             (II)  INFRASTRUCTURE, REHABILITATION,
    21                 CONSTRUCTION AND OTHER RELATED
    22                 COSTS TO REPAIR A DETERIORATED DOCK
    23                 WALL AT EAST DOBBINS LANDING            2,000,000
    24         (B)  ERIE COUNTY GENERAL AUTHORITY
    25             (I)  ACQUISITION, INFRASTRUCTURE,
    26                 CONSTRUCTION AND OTHER RELATED
    27                 COSTS OF ACQUIRING AND DEVELOPING A
    28                 PARCEL OF LAND FOR COMMERCIAL AND
    29                 INDUSTRIAL USE                          3,000,000
    30         (C)  CONSTRUCTION, RENOVATIONS AND
    20070H1589B2829                 - 112 -    

     1             EXPANSION OF THE EXPERIENCE CHILDREN'S
     2             MUSEUM, LOCATED IN THE HISTORIC
     3             DISTRICT OF DOWNTOWN ERIE                   2,000,000
     4     (ii)  City of Erie
     5         (A)  Acquisition, construction,
     6             infrastructure and other related costs
     7             for Downtown Erie revitalization           15,000,000
     8         (B)  DESIGN, INFRASTRUCTURE AND                            <--
     9             CONSTRUCTION OF A NEW PHARMACY SCHOOL
    10             AT LAKE ERIE COLLEGE OF OSTEOPATHIC
    11             MEDICINE                                   20,000,000
    12     (III)  HARBORCREEK TOWNSHIP
    13         (A)  ACQUISITION, INFRASTRUCTURE,
    14             CONSTRUCTION AND OTHER RELATED COSTS
    15             FOR THE DEVELOPMENT OF A LARGE-SCALE
    16             RETAIL AND ENTERTAINMENT COMPLEX IN THE
    17             VICINITY OF BREHAND CAMPUS OF THE
    18             PENNSYLVANIA STATE UNIVERSITY              12,000,000
    19     (IV)  REDEVELOPMENT AUTHORITY OF THE CITY OF
    20         CORRY
    21         (A)  ACQUISITION, INFRASTRUCTURE,
    22             RENOVATIONS AND REHABILITATION OF FIVE
    23             BUILDINGS COMPRISING THE WEST SIDE OF
    24             CENTER STREET BETWEEN WASHINGTON AVENUE
    25             AND MAIN STREET IN THE CITY OF CORRY
    26             FOR THE DEVELOPMENT OF MULTITENANT,
    27             MIXED-USE FACILITIES                        2,750,000
    28  (26)  Fayette County
    29     (i)  County projects (Reserved)                                <--
    30     (I)  COUNTY PROJECTS                                           <--
    20070H1589B2829                 - 113 -    

     1         (A)  CONNELLSVILLE AIRPORT, CONSTRUCTION OF
     2             RUNWAY 5-23 EXTENSION                       1,000,000
     3     (ii)  City of Uniontown
     4         (A)  Construction and other costs related
     5             to the expansion and renovation of
     6             Uniontown Hospital                         10,000,000
     7         (B)  CONSTRUCTION, ACQUISITION,                            <--
     8             REDEVELOPMENT AND OTHER COSTS RELATED
     9             TO THE DOWNTOWN UNIONTOWN REDEVELOPMENT
    10             PROJECT                                     1,800,000
    11     (iii)  Brownsville Borough
    12         (A)  Acquisition, construction,
    13             infrastructure and other related costs
    14             for the downtown revitalization             2,000,000
    15     (iv)  Perry Township
    16         (A)  Construction of new township municipal
    17             building                                    1,000,000
    18  (27)  Forest County (Reserved)
    19  (28)  Franklin County (Reserved)
    20  (29)  Fulton County (Reserved)                                    <--
    21  (29)  FULTON COUNTY                                               <--
    22     (I)  COUNTY PROJECTS
    23         (A)  CONSTRUCTION OF A MULTITENANT BUILDING
    24             WITHIN THE FULTON COUNTY BUSINESS PARK        500,000
    25  (30)  Green GREENE County                                         <--
    26     (i)  County projects (Reserved)
    27     (ii)  Cumberland Township
    28         (A)  Construction, infrastructure,
    29             redevelopment and other costs
    30             associated with the Carmichaels Clinic
    20070H1589B2829                 - 114 -    

     1             Expansion                                     500,000
     2     (iii)  Franklin Township
     3         (A)  Acquisition, construction and related
     4             site preparation for the Cornerstone
     5             Health Care Center                            750,000
     6         (B)  Construction and other related costs
     7             for the Community Aquatic Center            1,000,000
     8         (C)  Construction and other related costs
     9             for the expansions of the addition of
    10             Southwest Regional Medical Center           1,500,000
    11     (IV)  MORGAN TOWNSHIP                                          <--
    12         (A)  DEVELOPMENT, CONSTRUCTION AND OTHER
    13             RELATED COSTS FOR COMPLETION OF THE
    14             MATHER GOB PILE RECLAMATION PROJECT         4,500,000
    15     (V)  JEFFERSON TOWNSHIP
    16         (A)  ACQUISITION, CONSTRUCTION,
    17             INFRASTRUCTURE AND OTHER COSTS RELATED
    18             TO THE JEFFERSON TOWNSHIP MANUFACTURING
    19             FACILITY                                      500,000
    20     (iv) (VI)  Perry Township                                      <--
    21         (A)  Construction, infrastructure and other
    22             related costs for the Meadow Ridge
    23             Business Park                               3,000,000
    24     (v) (VII)  Waynesburg Borough                                  <--
    25         (A)  Construction, acquisition,
    26             infrastructure, redevelopment and other
    27             costs associated with Downtown
    28             Waynesburg Streetscape improvements         1,000,000
    29         (B)  Acquisition, construction,
    30             infrastructure and other related costs
    20070H1589B2829                 - 115 -    

     1             for the Greene County ARC Project           1,000,000
     2         (C)  Acquisition, construction,
     3             infrastructure and other related costs
     4             for Waynesburg redevelopment project        2,000,000
     5  (31)  Huntingdon County (Reserved)                                <--
     6  (31)  HUNTINGDON COUNTY                                           <--
     7     (I)  COUNTY PROJECTS (RESERVED)
     8     (II)  HUNTINGDON BOROUGH
     9         (A)  ACQUISITION, CONSTRUCTION AND
    10             REHABILITATION OF A TRAIN STATION
    11             STRUCTURE ON ALLEGHENY STREET IN THE
    12             HUNTINGDON BOROUGH HISTORIC DISTRICT        1,103,000
    13         (B)  INFRASTRUCTURE, REHABILITATION AND
    14             CONSTRUCTION OF A NEW MULTIPURPOSE
    15             COMMUNITY CENTER                            1,300,000
    16         (C)  ACQUISITION, CONSTRUCTION AND
    17             REHABILITATION OF SEVERAL PROPERTIES
    18             LOCATED ON ALLEGHENY STREET IN THE
    19             HUNTINGDON BOROUGH HISTORIC DISTRICT        2,000,000
    20     (III)  SHIRLEY TOWNSHIP
    21         (A)  SITE PREPARATION AND INFRASTRUCTURE
    22             FOR BACK LOT DEVELOPMENT OF RIVERVIEW
    23             BUSINESS AND INDUSTRIAL PARK                  750,000
    24         (B)  INFRASTRUCTURE IMPROVEMENTS TO THE
    25             RIVERVIEW BUSINESS CENTER                   1,100,000
    26     (IV)  SMITHFIELD TOWNSHIP
    27         (A)  LAND ACQUISITION AND SITE DEVELOPMENT
    28             OF A PROPERTY LOCATED EAST OF GIANT
    29             FOOD STORES ALONG ROUTE 22                    525,000
    30         (B)  SITE PREPARATION AND CONSTRUCTION OF A
    20070H1589B2829                 - 116 -    

     1             SHELL BUILDING FACILITY AT THE
     2             INTERSECTION OF US 26 US 22                 2,000,000
     3     (V)  SPRUCE CREEK TOWNSHIP
     4         (A)  INFRASTRUCTURE, CONSTRUCTION AND
     5             REHABILITATION TO UPGRADE FACILITIES AT
     6             THE UNION FURNACE QUARRY                    5,000,000
     7  (32)  Indiana County
     8     (i)  County projects
     9         (A)  Renovation of historical covered
    10             bridges, including acquisition,
    11             construction and other related costs        1,000,000
    12         (B)  ACQUISITION, INFRASTRUCTURE,                          <--
    13             CONSTRUCTION AND OTHER RELATED COSTS
    14             FOR THE DEVELOPMENT OF A MULTITENANT
    15             BUSINESS FACILITY                           4,000,000
    16         (C)  ACQUISITION, INFRASTRUCTURE,
    17             CONSTRUCTION AND OTHER RELATED COSTS
    18             FOR THE DEVELOPMENT OF A
    19             BUSINESS/INDUSTRIAL PARK                    5,000,000
    20     (ii)  Burrell Township
    21         (A)  Land acquisition, site preparation and
    22             construction related to development of
    23             ambulatory care center at Indiana
    24             Regional Medical Center                     5,000,000
    25         (B)  Expansion of the Interchange Center
    26             multitenant building, including
    27             construction, land acquisition and
    28             other related costs                         2,000,000
    29         (C)  Redevelopment of Corporate Campus
    30             Business Park, including acquisition,
    20070H1589B2829                 - 117 -    

     1             construction, infrastructure and other
     2             related costs                               3,000,000
     3     (iii)  Indiana Borough
     4         (A)  Redevelopment, construction, and
     5             infrastructure improvements along
     6             Philadelphia Street and 7th Street          5,000,000
     7     (iv)  White Township
     8         (A)  Expansion of the Indiana Regional
     9             Medical Center, including construction
    10             and related infrastructure                  1,000,000
    11         (B)  Construction of an agricultural
    12             multitenant building, including land
    13             acquisition, site preparation and other
    14             related costs                               3,000,000
    15         (C)  Redevelopment, construction and
    16             infrastructure improvements along Wayne
    17             Avenue and 13th Street                      4,000,000
    18         (D)  Renovation of the Mack Park Recreation
    19             Complex, including construction,
    20             infrastructure and other related costs      3,000,000
    21         (E)  Acquisition, construction and related
    22             infrastructure for the development of
    23             the Windy Ridge Business Park               4,000,000
    24         (F)  Construction of a medical-model
    25             wellness center at Indiana Regional
    26             Medical Center, including acquisition,
    27             infrastructure and other related costs      2,000,000
    28  (33)  Jefferson County (Reserved)                                 <--
    29         (G)  ACQUISITION, INFRASTRUCTURE,                          <--
    30             CONSTRUCTION AND OTHER RELATED COSTS
    20070H1589B2829                 - 118 -    

     1             FOR THE DEVELOPMENT OF A MULTITENANT
     2             BUSINESS FACILITY                           2,000,000
     3     (V)  CENTER TOWNSHIP
     4         (A)  ACQUISITION, INFRASTRUCTURE,
     5             CONSTRUCTION AND OTHER RELATED COSTS
     6             FOR THE DEVELOPMENT OF A MULTITENANT
     7             BUSINESS FACILITY                           4,000,000
     8  (33)  JEFFERSON COUNTY
     9     (I)  COUNTY PROJECTS (RESERVED)
    10     (II)  BROOKVILLE BOROUGH
    11         (A)  PATIENT CARE IMPROVEMENTS, INCLUDING
    12             EQUIPMENT ACQUISITION FOR BROOKVILLE
    13             HOSPITAL                                      750,000
    14     (III)  JEFFERSON COUNTY DEVELOPMENT COUNCIL,
    15         INC.
    16         (A)  JEFFERSON COUNTY ENTERPRISE PARK II -
    17             DEVELOPMENT OF APPROXIMATELY 90 ACRES
    18             OF VACANT LAND LOCATED NEAR I-80, EXIT
    19             73 FOR A BUSINESS PARK, INCLUDING LAND
    20             ACQUISITION AND WATER, SEWER AND
    21             ROADWAY INFRASTRUCTURE                      1,000,000
    22     (IV)  NORTH CENTRAL REGIONAL PLANNING AND
    23         DEVELOPMENT CORPORATION
    24         (A)  REDEVELOPMENT OF A 30-ACRE BROWNFIELD
    25             SITE FORMERLY OCCUPIED BY THE BROCKWAY
    26             CLAY PLANT FOR A BUSINESS COMMERCE
    27             PARK, INCLUDING LAND ACQUISITION,
    28             CONSTRUCTION OF A RAIL SPUR AND WATER,
    29             SEWER AND ROADWAY INFRASTRUCTURE            1,000,000
    30     (V)  PUNXSUTAWNEY BOROUGH
    20070H1589B2829                 - 119 -    

     1         (A)  ACQUISITION AND DEMOLITION OF BLIGHTED
     2             PROPERTY FOR BOROUGH REDEVELOPMENT            500,000
     3     (VI)  PUNXSUTAWNEY REGIONAL DEVELOPMENT
     4         CORPORATION
     5         (A)  RIKER'S YARD INDUSTRIAL SITE -
     6             DEVELOPMENT OF 80 ACRES OF VACANT LAND
     7             FOR INDUSTRIAL PURPOSES INCLUDING LAND
     8             ACQUISITION AND WATER, SEWER AND
     9             ROADWAY INFRASTRUCTURE                      1,500,000
    10         (B)  FACILITY IMPROVEMENTS AND UPGRADES,
    11             INCLUDING THE REPLACEMENT OF EMERGENCY
    12             POWER GENERATION EQUIPMENT, INFORMATION
    13             TECHNOLOGY NECESSARY TO SUPPORT PATIENT
    14             CARE AND SAFE MEDICATION ADMINISTRATION
    15             AT PUNXSUTAWNEY AREA HOSPITAL                 600,000
    16         (C)  IMPROVEMENT, REHABILITATION AND
    17             RENOVATION OF THE MEDICAL/SURGICAL
    18             INPATIENT UNIT, INCLUDING INFORMATION
    19             TECHNOLOGY ENHANCEMENTS NECESSARY FOR A
    20             FACILITY-WIDE TRANSITION TO ELECTRONIC
    21             HEALTH RECORDS AND PATIENT-FOCUSED CARE
    22             PHILOSOPHY AT PUNXSUTAWNEY AREA
    23             HOSPITAL                                    2,500,000
    24  (34)  Juniata County (Reserved)
    25  (35)  Lackawanna County
    26     (i)  County projects (Reserved)                                <--
    27     (I)  COUNTY PROJECTS                                           <--
    28         (A)  CONSTRUCTION OF NORTH POCONO AREA
    29             COMMUNITY CENTER                            2,000,000
    30         (B)  LAND ACQUISITION, INFRASTRUCTURE
    20070H1589B2829                 - 120 -    

     1             IMPROVEMENTS AND CONSTRUCTION OF
     2             RECREATIONAL AND ATHLETIC FIELD
     3             FACILITIES ALONG ROUTE 6, LACKAWANNA
     4             COLLEGE                                     3,000,000
     5     (I.1)  CLARKS GREEN BOROUGH, CLARKS SUMMIT
     6         BOROUGH, GLENBURN TOWNSHIP AND SOUTH
     7         ABINGTON TOWNSHIP
     8         (A)  INFRASTRUCTURE IMPROVEMENTS AND
     9             CONSTRUCTION OF THE ABINGTON AREA
    10             COMMUNITY PARK                              8,344,000
    11     (ii)  Dunmore Borough
    12         (A)  Construction and other costs related
    13             to building the Dunmore Fire Station        1,400,000
    14         (B)  Construction, infrastructure,
    15             redevelopment and other costs related
    16             to building the Dunmore High School
    17             Health and Fitness Center                   1,000,000
    18     (II.1)  JESSUP BOROUGH                                         <--
    19         (A)  CONSTRUCTION OF TECHNOLOGY FACILITY
    20             BUILDING WITHIN THE JESSUP SMALL
    21             BUSINESS CENTER/VALLEY VIEW BUSINESS
    22             PARK                                        2,750,000
    23     (II.2)  MOOSIC BOROUGH
    24         (A)  ACQUISITION, INFRASTRUCTURE
    25             IMPROVEMENTS, DEVELOPMENTS AND
    26             CONSTRUCTION OF LACKAWANNA COUNTY
    27             BASEBALL STADIUM AND ADJACENT PROPERTY     35,000,000
    28     (iii)  City of Scranton
    29         (A)  Acquisition and other costs related to
    30             providing the Vocational Services
    20070H1589B2829                 - 121 -    

     1             Community Employment Program and
     2             Sheltered Workshop                          1,000,000
     3         (B)  Construction, infrastructure,
     4             redevelopment and other costs related
     5             to the West Scranton Revitalization
     6             Project                                     3,000,000
     7         (C)  Construction, redevelopment and other
     8             costs related to the Ney NAY Aug Zoo                   <--
     9             renovation and addition                    10,000,000
    10         (D)  CONSTRUCTION FOR THE EXPANSION OF                     <--
    11             JOHNSON COLLEGE                             1,985,000
    12         (E)  INFRASTRUCTURE IMPROVEMENTS AND
    13             CONSTRUCTION OF THE MARYWOOD UNIVERSITY
    14             ATHLETIC FIELD FACILITY                     1,000,000
    15         (F)  ACQUISITION, INFRASTRUCTURE
    16             IMPROVEMENTS AND CONSTRUCTION OF A
    17             PARKING GARAGE FOR THE COMMONWEALTH
    18             MEDICAL COLLEGE                            10,000,000
    19         (G)  ACQUISITION AND CONSTRUCTION FOR FILM
    20             PRODUCTION FACILITY                         6,000,000
    21         (H)  ACQUISITION, INFRASTRUCTURE
    22             IMPROVEMENTS AND CONSTRUCTION OF
    23             SCRANTON PUBLIC LIBRARY                     7,500,000
    24         (I)  ACQUISITION, INFRASTRUCTURE
    25             IMPROVEMENTS, CONSTRUCTION AND RELATED
    26             COSTS FOR A NEW SCIENCE CENTER AND
    27             ACADEMIC FACILITIES FOR THE UNIVERSITY
    28             OF SCRANTON                                37,500,000
    29         (J)  ACQUISITION, INFRASTRUCTURE
    30             IMPROVEMENTS, CONSTRUCTION AND RELATED
    20070H1589B2829                 - 122 -    

     1             COSTS FOR AN ATHLETIC COMPLEX AND
     2             RELATED FACILITIES FOR THE UNIVERSITY
     3             OF SCRANTON                                10,000,000
     4         (K)  ACQUISITION, INFRASTRUCTURE
     5             IMPROVEMENTS, CONSTRUCTION AND RELATED
     6             COSTS FOR THE MULBERRY STREET
     7             IMPROVEMENT PROJECT AT THE UNIVERSITY
     8             OF SCRANTON                                 1,500,000
     9     (iv)  South Abington Township
    10         (A)  Acquisition, redevelopment and costs
    11             associated with building the South
    12             Abington Township Community Center          1,200,000
    13     (v)  Throop Borough
    14         (A)  Construction, redevelopment and other
    15             costs related to renovation of Throop
    16             Hose Company No. 3                          1,000,000
    17         (B)  Construction, acquisition and other
    18             costs related to building Throop Hose
    19             Company No. 2                               1,260,000
    20  (36)  Lancaster County
    21     (i)  County projects (Reserved)                                <--
    22     (I)  COUNTY PROJECTS                                           <--
    23         (A)  ACQUISITION, INFRASTRUCTURE,
    24             RENOVATIONS, CONSTRUCTION AND OTHER
    25             RELATED COSTS FOR THE DEVELOPMENT OF A
    26             COMMUNITY HEALTH CENTER AT LANCASTER
    27             GENERAL HOSPITAL                            2,500,000
    28         (B)  ACQUISITION, INFRASTRUCTURE,
    29             RENOVATIONS, CONSTRUCTION AND OTHER
    30             RELATED COSTS FOR THE HISTORIC
    20070H1589B2829                 - 123 -    

     1             PRESERVATION TRUST OF LANCASTER COUNTY
     2             FOR THE STEVENS-SMITH HISTORIC SITE
     3             PROJECT                                     6,000,000
     4         (C)  DESIGN, INFRASTRUCTURE, CONSTRUCTION
     5             AND OTHER RELATED COSTS FOR THE
     6             DEVELOPMENT OF A CAMPUS OF HISTORY FOR
     7             THE LANCASTER COUNTY HISTORICAL
     8             SOCIETY                                     9,000,000
     9         (D)  ACQUISITION, DESIGN, INFRASTRUCTURE,
    10             CONSTRUCTION AND OTHER RELATED COSTS OF
    11             BUILDING A NEW FACILITY, INCLUDING A
    12             PLANETARIUM AND EXHIBITS AT THE NORTH
    13             MUSEUM OF NATURAL HISTORY AND SCIENCE       3,000,000
    14     (ii)  City of Lancaster
    15         (A)  Construction and other related costs
    16             for the Thaddeus Stevens Technology
    17             Center                                      4,000,000
    18         (B)  Infrastructure and other costs
    19             associated with Lancaster wireless
    20             access                                      1,000,000
    21         (C)  INFRASTRUCTURE AND EQUIPMENT TO                       <--
    22             SUPPORT A NETWORK OF PUBLIC SAFETY
    23             SURVEILLANCE CAMERAS THROUGHOUT THE
    24             CITY OF LANCASTER FOR THE LANCASTER
    25             COMMUNITY SAFETY COALITION                    600,000
    26         (D)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
    27             RELATED COSTS TO EXPAND, IMPROVE AND
    28             UPDATE FACILITIES AT THE LANCASTER
    29             PUBLIC LIBRARY                              3,500,000
    30         (E)  ACQUISITION, INFRASTRUCTURE,
    20070H1589B2829                 - 124 -    

     1             DEMOLITION AND OTHER RELATED COSTS FOR
     2             THE CONSTRUCTION OF A NEW FACILITY
     3             LOCATED WITHIN THE JAMES STREET
     4             IMPROVEMENT DISTRICT FOR THE LANCASTER
     5             YMCA                                        6,000,000
     6         (F)  REDEVELOPMENT AUTHORITY OF THE CITY OF
     7             LANCASTER, FOR RESTORATION OF THE
     8             HISTORIC MONTGOMERY HOUSE LOCATED IN
     9             DOWNTOWN LANCASTER                          1,250,000
    10     (iii)  Columbia Borough
    11         (A)  Acquisition and renovation of Center
    12             for Brain Injured Children at the
    13             Lazarus Foundation                            913,000
    14         (B)  ACQUISITION, INFRASTRUCTURE,                          <--
    15             REHABILITATION AND CONSTRUCTION OF THE
    16             COLUMBIA FIREMAN'S MUSEUM, AN
    17             INTERACTIVE FIREHOUSE MUSEUM                4,625,000
    18     (iv)  Ephrata Borough
    19         (A)  Redevelopment of Mountain Springs
    20             Hotel property, including related
    21             infrastructure                                500,000
    22     (V)  EPHRATA TOWNSHIP                                          <--
    23         (A)  INFRASTRUCTURE, CONSTRUCTION AND OTHER
    24             RELATED COSTS OF CONVERTING 50.8 ACRES
    25             OF LAND INTO A COMMUNITY RECREATIONAL
    26             PARK                                        1,530,000
    27     (v) (VI)  New Holland Borough                                  <--
    28         (A)  Redevelopment of historic building on
    29             Main Street, including related
    30             infrastructure                                500,000
    20070H1589B2829                 - 125 -    

     1         (B)  ACQUISITION, INFRASTRUCTURE,                          <--
     2             DEVELOPMENT AND CONSTRUCTION ON AN EAST
     3             MAIN STREET VACANT PARCEL FOR THE NEW
     4             HOLLAND FARMERS FAIR ASSOCIATION
     5             EXHIBIT HALL PROJECT                          600,000
     6     (VII)  EAST COCALICO TOWNSHIP
     7         (A)  ACQUISITION, INFRASTRUCTURE,
     8             REHABILITATION AND CONSTRUCTION OF A
     9             COMMUNITY CENTER ON NORTH READING ROAD      4,000,000
    10     (VIII)  EAST LAMPETER TOWNSHIP
    11         (A)  INFRASTRUCTURE, CONSTRUCTION AND OTHER
    12             RELATED COSTS FOR IMPROVEMENTS TO THE
    13             STRASBURG PIKE FRONTAGE OF THE FLORY
    14             PARK DEVELOPMENT PROJECT                      500,000
    15     (IX)  HONEY BROOK TOWNSHIP
    16         (A)  ACQUISITION, INFRASTRUCTURE AND
    17             CONSTRUCTION OF A NEW MUNICIPAL
    18             BUILDING                                    1,850,000
    19     (X)  MANHEIM BOROUGH
    20         (A)  RENOVATIONS TO THE MANHEIM BOROUGH
    21             OFFICE BUILDING, CONSISTING OF
    22             CONSTRUCTION OF HANDICAP ACCESSIBILITY      1,300,000
    23     (XI)  MOUNT JOY BOROUGH
    24         (A)  INFRASTRUCTURE, REHABILITATION AND
    25             CONSTRUCTION OF A SATELLITE BRANCH YMCA
    26             FACILITY                                    4,000,000
    27     (XII)  WARWICK TOWNSHIP
    28         (A)  ACQUISITION, INFRASTRUCTURE,
    29             REHABILITATION, CONSTRUCTION AND OTHER
    30             RELATED COSTS OF CONVERTING 5.5 MILES
    20070H1589B2829                 - 126 -    

     1             OF THE FORMER READING AND COLUMBIA
     2             RAILROAD CORRIDOR INTO A LINEAR TRAIL         875,000
     3         (B)  REHABILITATION AND EXPANSION OF THE
     4             LITITZ RECREATIONAL CENTER                    700,000
     5  (37)  Lawrence County
     6     (i)  County projects
     7         (A)  Construction, acquisition,
     8             infrastructure, redevelopment and other
     9             costs related to the Lawrence County
    10             South Central Route 18 Development
    11             District                                   12,000,000
    12         (B)  Construction, acquisition,
    13             infrastructure, redevelopment and other
    14             costs related to the Central Lawrence
    15             County Route 422 Corridor Development
    16             Area                                        8,000,000
    17     (ii)  Elwood City Borough
    18         (A)  Acquisition, construction,
    19             infrastructure and other related costs
    20             for the Ellwood Borough East Commerce
    21             Park                                       10,000,000
    22     (II.1)  CITY OF NEW CASTLE                                     <--
    23         (A)  ACQUISITION, INFRASTRUCTURE
    24             IMPROVEMENTS AND CONSTRUCTION FOR THE
    25             DOWNTOWN REVITALIZATION PROJECT            10,000,000
    26         (B)  INFRASTRUCTURE IMPROVEMENTS AND
    27             CONSTRUCTION OF A NATIONAL CHARACTER
    28             EDUCATION FOUNDATION TRAINING
    29             HEADQUARTERS                                6,000,000
    30     (iii)  New Wilmington Borough
    20070H1589B2829                 - 127 -    

     1         (A)  Acquisition, construction,
     2             infrastructure and other costs related
     3             to the rehabilitation of downtown New
     4             Wilmington                                  1,500,000
     5  (38)  Lebanon County
     6     (i)  County projects (Reserved)
     7     (ii)  City of Lebanon
     8         (A)  Acquisition, construction,
     9             infrastructure and other related costs
    10             for downtown urban corridor
    11             revitalization                             10,000,000
    12     (iii)  South Lebanon Township
    13         (A)  Redevelopment of police department
    14             facilities, including construction and
    15             related infrastructure                        565,000
    16  (39)  Lehigh County
    17     (i)  County projects (Reserved)                                <--
    18     (I)  COUNTY PROJECTS                                           <--
    19         (A)  INFRASTRUCTURE, DESIGN AND OTHER
    20             RELATED COSTS TO THE TRANSITIONING TO A
    21             HIGH-PERFORMANCE EMERGENCY SERVICES
    22             PROGRAM                                     5,000,000
    23         (B)  LEHIGH VALLEY ECONOMIC DEVELOPMENT
    24             CORPORATION
    25             (I)  INFRASTRUCTURE AND REHABILITATION
    26                 OF AN ASSISTIVE TECHNOLOGY
    27                 INCUBATOR CENTER                        7,000,000
    28             (II)  INFRASTRUCTURE, CONSTRUCTION AND
    29                 REHABILITATION OF THE DOWNTOWN
    30                 AMERICUS CENTER                        15,000,000
    20070H1589B2829                 - 128 -    

     1         (C)  INFRASTRUCTURE, CONSTRUCTION AND OTHER
     2             RELATED COSTS OF A WATERFRONT
     3             DEVELOPMENT ON FRONT STREET BETWEEN
     4             BUCKY BOYLE PARK AND THE TRANSPORTATION
     5             MUSEUM                                     28,000,000
     6         (D)  ACQUISITION AND RENOVATIONS OF A
     7             FACILITY TO BE USED AS A THERAPEUTIC
     8             COMMUNITY DEDICATED TO PROVIDING
     9             ADDICTION AND MENTAL HEALTH TREATMENT
    10             FOR VETERANS                                1,250,000
    11         (E)  LAND ACQUISITION, INFRASTRUCTURE
    12             IMPROVEMENTS AND CONSTRUCTION NECESSARY
    13             TO MAINTAIN THE COMPETITIVE POSITION OF
    14             AN EXISTING BUSINESS ENTITY OR FOR THE
    15             DEVELOPMENT OF BUSINESS-READY SITES FOR
    16             POTENTIAL BUSINESS TENANTS                  1,000,000
    17         (F)  REHABILITATION AND REDEVELOPMENT OF A
    18             BUILDING FOR THE PURPOSES OF AN
    19             ASSOCIATION FOR BLIND AND VISUALLY
    20             IMPAIRED PROGRAM EXPANSION TO FULLY
    21             INTEGRATE A ONE-STOP LOW VISION CENTER,
    22             A FULLY EQUIPPED AIDS AND DEVICES STORE
    23             AND A STATE-OF-THE-ART TECHNOLOGY
    24             CENTER                                        725,000
    25     (ii)  City of Allentown
    26         (A)  Construction, redevelopment and other
    27             costs associated with expansion and
    28             renovation of Lehigh Valley Hospital        1,000,000
    29         (B)  Acquisition, redevelopment,
    30             streetscape improvement and other costs
    20070H1589B2829                 - 129 -    

     1             related to the 7th Street Property
     2             Acquisition and Beautification Project      3,000,000
     3         (C)  Acquisition, redevelopment and other
     4             costs related to the Americus Design
     5             Center                                      5,000,000
     6         (D)  Acquisition, redevelopment and other
     7             costs associated with building the
     8             Allentown Conference/Convention Center      5,000,000
     9         (E)  Acquisition, park land reclamation and
    10             other costs related to the St. Elmo
    11             Park Development                            3,000,000
    12         (F)  Acquisition, redevelopment and other
    13             costs associated with the Performing
    14             and Visual Arts Center                      7,000,000
    15         (G)  DEMOLITION OF SALS RESTAURANT AND                     <--
    16             CONSTRUCTION OF A NEW UPSCALE
    17             RESTAURANT                                    500,000
    18         (H)  ACQUISITION, INFRASTRUCTURE,
    19             RENOVATION AND REDEVELOPMENT OF SEVERAL
    20             PROPERTIES IN OLD ALLENTOWN INTO ARTIST
    21             LOFTS                                         500,000
    22         (I)  ACQUISITION OF LAND AND CONSTRUCTION
    23             OF A PARK ON A ST. ELMO STREET LOT            500,000
    24         (J)  CONSTRUCTION, RENOVATIONS AND
    25             REDEVELOPMENT OF THE FORMER SCHOENS
    26             FURNITURE STORE INTO CLASS A OFFICES,
    27             RETAIL AND LOFTS                            1,000,000
    28         (K)  ACQUISITION, INFRASTRUCTURE,
    29             RENOVATIONS AND REDEVELOPMENT FOR THE
    30             PURPOSES OF CREATING A DOWNTOWN
    20070H1589B2829                 - 130 -    

     1             CULTURAL ARTS DISTRICT                      1,000,000
     2         (L)  ACQUISITION, INFRASTRUCTURE,
     3             RENOVATIONS AND REDEVELOPMENT OF THE
     4             7TH STREET COMMERCIAL CORRIDOR              1,000,000
     5         (M)  ACQUISITION, INFRASTRUCTURE,
     6             REDEVELOPMENT AND CONSTRUCTION OF
     7             HOMEOWNERSHIP UNITS LOCATED WITHIN THE
     8             HISTORIC OLD ALLENTOWN NEIGHBORHOOD         1,000,000
     9         (N)  ACQUISITION, INFRASTRUCTURE,
    10             DEMOLITION, RENOVATIONS AND
    11             REDEVELOPMENT OF BUILDINGS AROUND NEW
    12             MUSEUM AND CREATION OF RIVER WALK AND
    13             MARINA AT LEHIGH LANDING, PHASE II          1,500,000
    14         (O)  ACQUISITION, INFRASTRUCTURE,
    15             RENOVATION AND REDEVELOPMENT OF 26
    16             ACRES LOCATED ON THE LEHIGH STRUCTURAL
    17             STEEL SITE FOR MIXED-USE PURPOSES FOR
    18             WATERFRONT COMMONS, PHASE I                 2,000,000
    19         (P)  ACQUISITION, INFRASTRUCTURE,
    20             CONSTRUCTION AND REDEVELOPMENT OF THE
    21             HANOVER ACRES SITE AND PROPERTIES ALONG
    22             HANOVER STREET FOR OVERLOOK PARK, PHASE
    23             II                                          2,000,000
    24         (Q)  INFRASTRUCTURE, RENOVATION AND
    25             REDEVELOPMENT OF KEY DOWNTOWN
    26             NEIGHBORHOODS FOR OLD ALLENTOWN
    27             NEIGHBORHOOD REVITALIZATION PROJECT         2,000,000
    28         (R)  ACQUISITION, CONSTRUCTION AND OTHER
    29             RELATED COSTS TO REDEVELOP THE
    30             FAIRGROUNDS FARMERS MARKET AND 19TH
    20070H1589B2829                 - 131 -    

     1             STREET                                      2,000,000
     2         (S)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
     3             RELATED COSTS TO DEVELOP THE CITYWIDE
     4             SECURITY CAMERA AND SHOT SPOTTER
     5             PROGRAM TO IMPROVE SAFETY AND INCREASE
     6             ECONOMIC DEVELOPMENT                        2,000,000
     7         (T)  ACQUISITION AND REDEVELOPMENT OF A 26-
     8             ACRE URBAN BROWNFIELD SITE INTO A
     9             WATERFRONT COMMUNITY                        2,500,000
    10         (U)  INFRASTRUCTURE, CONSTRUCTION AND
    11             REDEVELOPMENT OF THE LEHIGH LANDING
    12             OFFICE DEVELOPMENT FOR LEHIGH LANDING,
    13             PHASE I                                     2,500,000
    14         (V)  CONSTRUCTION AND RENOVATIONS TO THE
    15             HISTORIC CIVIC THEATRE                      5,000,000
    16         (W)  CONSTRUCTION, RENOVATIONS AND
    17             REDEVELOPMENT OF THE AMERICUS HOTEL
    18             INTO A MIXED-USE FACILITY                   5,000,000
    19         (X)  INFRASTRUCTURE, CONSTRUCTION AND
    20             REDEVELOPMENT OF VACANT PARKING LOTS
    21             AND UNDERUTILIZED BUILDINGS ALONG 7TH
    22             STREET IN DOWNTOWN ALLENTOWN                5,000,000
    23         (Y)  ACQUISITION, INFRASTRUCTURE,
    24             RENOVATION AND REDEVELOPMENT OF THE
    25             DOWNTOWN POST OFFICE TO A STATE-OF-THE-
    26             ART VISUAL ARTS CENTER                      7,000,000
    27         (Z)  ACQUISITION, INFRASTRUCTURE,
    28             RENOVATIONS AND REDEVELOPMENT OF A NEW
    29             DOWNTOWN EXECUTIVE CONFERENCE CENTER
    30             NEXT TO CROWNE PLAZA                        7,000,000
    20070H1589B2829                 - 132 -    

     1     (iii)  City of Bethlehem
     2         (A)  Construction and other related costs
     3             for the renovation and expansion of the
     4             Lehigh Valley Hospital-Muhlenberg           5,000,000
     5         (B)  ACQUISITION, INFRASTRUCTURE                           <--
     6             IMPROVEMENTS, RENOVATIONS AND
     7             CONSTRUCTION OF MARTIN TOWER, FORMER
     8             WORLD HEADQUARTERS OF BETHLEHEM STEEL      10,000,000
     9     (III.1)  CATASAUQUA BOROUGH
    10         (A)  CONSTRUCTION OF EMERGENCY SERVICES
    11             BUILDING                                    1,600,000
    12     (iv)  Emmaus Borough
    13         (A)  Construction and acquisition of Emmaus
    14             Main Street Parking Deck                    5,000,000
    15         (B)  Construction and acquisition of Emmaus
    16             Main Street Community Center                3,000,000
    17         (C)  TRIANGLE PROJECT, PHASE II,                           <--
    18             REDEVELOPMENT OF DOWNTOWN, INCLUDING
    19             NECESSARY COSTS                               500,000
    20     (v)  Lower Macungie Township
    21         (A)  Acquisition, construction,
    22             infrastructure and other related costs
    23             for a new Lower Macungie Fire
    24             Department Fire Station                     2,000,000
    25     (V.1)  MACUNGIE BOROUGH                                        <--
    26         (A)  ACQUISITION OF LAND ADJACENT TO
    27             MACUNGIE MEMORIAL PARK ACROSS SWABIN
    28             CREEK, WITH CONSTRUCTION AND
    29             INSTALLATION OF A FIRST BRIDGE ACROSS
    30             THE CREEK AND RECREATIONAL EQUIPMENT
    20070H1589B2829                 - 133 -    

     1             IMPROVEMENT                                   800,000
     2     (V.2)  NORTH WHITEHALL TOWNSHIP
     3         (A)  CONSTRUCTION OF FOUR ATHLETIC FIELDS       2,200,000
     4         (B)  ACQUISITION, INFRASTRUCTURE
     5             IMPROVEMENTS, RENOVATIONS AND
     6             CONSTRUCTION OF CAMP FOWLER                 3,000,000
     7     (vi)  Salisbury Township
     8         (A)  Acquisition, construction,
     9             infrastructure and other related costs
    10             for the Emergency Department and
    11             Imaging Department expansion at Lehigh
    12             Valley Hospital and Health Network          5,300,000
    13     (vii)  Upper Saucon Township
    14         (A)  Construction, infrastructure and
    15             related costs for the Gambet Center for
    16             Innovation and Global Competitiveness       4,000,000
    17         (B)  CONSTRUCTION OF A BASEBALL STADIUM AT                 <--
    18             DESALES UNIVERSITY                          1,750,000
    19         (C)  CONSTRUCTION OF THE MCSHEA STUDENT
    20             UNION CENTER AT DESALES UNIVERSITY          7,500,000
    21     (VIII)  NORTH WHITEHALL TOWNSHIP
    22         (A)  CONSTRUCTION AND REDEVELOPMENT OF FOUR
    23             STATE-OF-THE-ART ATHLETIC FIELDS FOR
    24             USE BY LEHIGH CARBON COMMUNITY COLLEGE
    25             STUDENTS AND COMMUNITY YOUTH GROUPS         2,112,000
    26  (40)  Luzerne County
    27     (i)  County projects (Reserved)                                <--
    28     (I)  COUNTY PROJECTS                                           <--
    29         (A)  ACQUISITION, INFRASTRUCTURE,
    30             CONSTRUCTION AND OTHER RELATED COSTS
    20070H1589B2829                 - 134 -    

     1             FOR THE DEVELOPMENT OF THE LANDS AT
     2             HILLSIDE FARMS, A MULTITENANT, MIXED-
     3             USE COMMUNITY LOCATED IN JACKSON AND
     4             KINGSTON TOWNSHIPS                          4,000,000
     5     (ii)  Ashley Borough
     6         (A)  Construction, infrastructure and other
     7             related costs for the Ashley Lane
     8             Project                                       500,000
     9         (B)  Acquisition, construction and other
    10             related costs for the Mill Street Mill
    11             Project                                       500,000
    12     (iii)  City of Nanticoke
    13         (A)  Acquisition, construction,
    14             infrastructure and other related costs
    15             for mixed-use development on East Main
    16             Street                                      1,000,000
    17         (B)  Construction, infrastructure and other
    18             related costs for the Luzerne County
    19             Community College Public Safety
    20             Institute                                   1,000,000  <--
    21             INSTITUTE                                  35,447,000  <--
    22         (C)  Construction and other related costs
    23             for downtown parking expansion              2,000,000
    24         (D)  Acquisition, construction,
    25             infrastructure and other related costs
    26             for Luzerne County Community College
    27             student housing                             2,000,000
    28         (E)  Construction, infrastructure,
    29             redevelopment and other costs related
    30             to new housing at Susquehanna Coal
    20070H1589B2829                 - 135 -    

     1             Building                                      500,000
     2         (F)  Acquisition, construction and other
     3             related costs for the Lower Broadway
     4             Park multi-use project                      1,000,000
     5         (G)  Acquisition, construction,
     6             infrastructure and other related costs
     7             for the Luzerne County Community
     8             College Culinary Arts Building with
     9             parking                                     3,000,000
    10         (H)  CONSTRUCTION AND RELATED COSTS FOR THE                <--
    11             KANJORSKI BUILDING HEALTH SCIENCES
    12             CENTER AT LUZERNE COMMUNITY COLLEGE         2,352,000
    13     (iv)  City of Wilkes-Barre
    14         (A)  Acquisition, construction,
    15             infrastructure and other related costs
    16             for the revitalization of the 100 block
    17             of South Main Street                       13,000,000
    18         (B)  Construction, infrastructure and other
    19             related costs for the renovation of the
    20             public square                               1,500,000
    21         (C)  Construction, infrastructure and other
    22             related costs for the redevelopment of
    23             the Kirby Park recreation area                750,000
    24         (D)  Construction, infrastructure,
    25             redevelopment, abatement of hazardous
    26             materials and other costs related to
    27             building the Irem Temple Mosque            10,000,000
    28         (E)  Construction, infrastructure,
    29             abatement of hazardous materials and
    30             other costs related to Impact Wilkes-
    20070H1589B2829                 - 136 -    

     1             Barre                                       5,000,000
     2         (F)  Construction, infrastructure,
     3             acquisition, abatement of hazardous
     4             materials, redevelopment and other
     5             costs related to Impact Wilkes-Barre        3,000,000
     6         (G)  Construction, infrastructure,
     7             acquisition, abatement of hazardous
     8             materials, redevelopment and other
     9             costs relates to Downtown Wilkes-Barre
    10             Revitalization Phase II                    15,000,000
    11         (H)  Construction, acquisition,
    12             infrastructure, redevelopment,
    13             abatement of hazardous materials and
    14             other costs related to Hanover
    15             Industrial Estates                          1,000,000
    16         (I)  Acquisition, construction,
    17             infrastructure and other related costs
    18             for a mixed-use facility at the Murray
    19             Complex                                    10,000,000
    20         (J)  Construction, infrastructure and other
    21             related costs for the Coal Street Park
    22             Office Complex                              7,000,000
    23         (K)  Acquisition, construction,
    24             infrastructure and other related costs
    25             for an intermodal transportation
    26             facility                                    4,000,000
    27         (L)  Construction, infrastructure and other
    28             related costs for the Coal Street Park
    29             Regional Sports Complex                     8,000,000
    30         (M)  Construction and other related costs
    20070H1589B2829                 - 137 -    

     1             for the redevelopment of the Murray
     2             Courtwright Complex                         5,000,000
     3         (N)  Construction, acquisition,
     4             infrastructure, redevelopment,
     5             abatement of hazardous materials and
     6             other associated with the West Market
     7             Street Mixed-Use Revitalization
     8             Project                                     5,000,000
     9         (O)  CONSTRUCTION, INFRASTRUCTURE                          <--
    10             IMPROVEMENTS, ABATEMENT OF HAZARDOUS
    11             MATERIALS AND CONSTRUCTION FOR PARKING
    12             FACILITIES IN DOWNTOWN WILKES-BARRE         5,000,000
    13     (iv.1)  Dallas Borough
    14         (A)  Acquisition, construction,
    15             infrastructure and other costs related
    16             to the expansion of Back Mountain
    17             Cultural Arts Center                          500,000
    18     (IV.2)  DALLAS TOWNSHIP                                        <--
    19         (A)  INFRASTRUCTURE, REHABILITATION AND
    20             CONSTRUCTION OF A MULTICOMMUNITY INDOOR
    21             ATHLETIC FACILITY                             500,000
    22     (v)  Hanover Township
    23         (A)  Construction, acquisition,
    24             infrastructure, redevelopment and other
    25             costs related to Hanover Crossings
    26             Phase III and IV                            4,000,000
    27         (B)  Acquisition, construction,                            <--
    28             infrastructure and other related costs
    29             for Hanover Crossings Phase III and IV      4,000,000
    30     (vi)  Hazle Township
    20070H1589B2829                 - 138 -    

     1         (A)  Acquisition, construction,
     2             infrastructure and other related costs
     3             for the development of a cargo airport    250,000,000
     4     (vii)  Kingston Borough
     5         (A)  Construction and other related costs
     6             for the Hoyt Library Construction
     7             Project                                     1,500,000
     8         (B)  RENOVATION, CONSTRUCTION,                             <--
     9             INFRASTRUCTURE AND RELATED COSTS FOR
    10             ELEMENTARY, MIDDLE AND HIGH SCHOOL
    11             PROJECTS FOR WYOMING VALLEY WEST SCHOOL
    12             DISTRICT                                   46,500,000
    13     (VIII)  LEHMAN TOWNSHIP
    14         (A)  INFRASTRUCTURE, REHABILITATION AND
    15             CONSTRUCTION OF A MULTICOMMUNITY INDOOR
    16             ATHLETIC FACILITY                             500,000
    17     (IX)  PLAINS TOWNSHIP
    18         (A)  BIRCHWOOD PARK IMPROVEMENT PROJECT           319,000
    19     (X)  PITTSTON
    20         (A)  INFRASTRUCTURE IMPROVEMENTS AND
    21             CONSTRUCTION FOR CENTER POINT EAST
    22             PHASE III PROJECT                           7,900,000
    23         (B)  INFRASTRUCTURE IMPROVEMENTS AND
    24             CONSTRUCTION FOR CENTER POINT SOUTH
    25             PROJECT                                     2,400,000
    26         (C)  INFRASTRUCTURE IMPROVEMENTS AND
    27             CONSTRUCTION FOR CENTER POINT WEST
    28             PROJECT                                     3,850,000
    29         (D)  ACQUISITION, DEMOLITION,
    30             INFRASTRUCTURE, CONSTRUCTION AND
    20070H1589B2829                 - 139 -    

     1             RELATED COSTS FOR THE DOWNTOWN PITTSTON
     2             REDEVELOPMENT PROJECT                      10,000,000
     3         (E)  CONSTRUCTION AND INFRASTRUCTURE FOR
     4             SECURITY CONTROL CENTER FOR PITTSTON
     5             AREA SCHOOL DISTRICT                          635,000
     6     (viii) (XI)  Wilkes-Barre Township                             <--
     7         (A)  Construction and other related costs
     8             for the renovation of the township
     9             municipal building                            500,000
    10         (B)  Construction and other related costs
    11             for the township police building              800,000
    12     (ix) (XII)  Wright Township                                    <--
    13         (A)  Construction, infrastructure,
    14             abatement of hazardous materials,
    15             redevelopment and other costs related
    16             to Crestwood Industrial Park                2,500,000
    17         (B)  Acquisition, construction,                            <--
    18             infrastructure and other related costs
    19             for Crestwood Industrial Park               1,500,000
    20  (41)  Lycoming County
    21     (i)  County projects
    22         (A)  Acquisition, construction,
    23             infrastructure and other related costs
    24             for the Williamsport Crosscutter's
    25             Stadium project                            15,000,000
    26         (B)  DESIGN AND CONSTRUCTION OF A RAIL SPUR                <--
    27             TO SUPPORT THE ECONOMIC DEVELOPMENT OF
    28             THE NEW MUNCY INDUSTRIAL PARK PHASES
    29             II, III AND IV                              1,000,000
    30         (C)  DESIGN, INFRASTRUCTURE, CONSTRUCTION
    20070H1589B2829                 - 140 -    

     1             AND OTHER RELATED COSTS FOR THE
     2             DEVELOPMENT OF PHASE IV OF THE MUNCY
     3             INDUSTRIAL PARK                             1,000,000
     4         (D)  DESIGN, CONSTRUCTION AND OTHER RELATED
     5             COSTS TO PROVIDE WATER, SEWER AND ROAD
     6             INFRASTRUCTURE WITHIN TIMBER END PARK,
     7             A 226-ACRE DESIGNATED KEYSTONE
     8             OPPORTUNITY ZONE                            1,000,000
     9     (ii)  City of Williamsport
    10         (A)  Redevelopment and expansion of
    11             Susquehanna Health Hospital, including
    12             acquisition                                10,000,000
    13         (B)  Acquisition, construction,
    14             infrastructure and other related costs
    15             for the revitalization of Textrom
    16             Lycoming facilities                        10,000,000
    17         (C)  Design and construction of a new
    18             intermodal facility, including related
    19             infrastructure for the Church Street
    20             Transportation Center                       4,000,000
    21         (D)  INFRASTRUCTURE, REDEVELOPMENT,                        <--
    22             CONSTRUCTION AND OTHER RELATED COSTS
    23             FOR THE IMPROVEMENT AND EXPANSION OF
    24             THE REACH ROAD INDUSTRIAL PARK              1,250,000
    25     (iii)  Clinton Township
    26         (A)  Acquisition, construction,
    27             infrastructure and other related costs
    28             for the White Deer Recreation Complex       1,000,000
    29     (iv)  Jersey Shore Borough
    30         (A)  Redevelopment of the Jersey Shore
    20070H1589B2829                 - 141 -    

     1             YMCA, including construction and
     2             related infrastructure                      1,500,000
     3     (v)  Muncy Township
     4         (A)  Infrastructure within Phase IV of the
     5             Muncy Industrial Park                       1,000,000
     6         (B)  Acquisition, construction,
     7             infrastructure and other related costs
     8             for the Eastern Lycoming County Senior
     9             Center                                        500,000
    10         (C)  Construction, infrastructure and other
    11             related costs for the Halls Station
    12             Water Phase I Plus                          4,000,000
    13  (42)  McKean County (Reserved)                                    <--
    14  (42)  MCKEAN COUNTY                                               <--
    15     (I)  COUNTY PROJECTS
    16         (A)  IMPACT KANE - REDEVELOPMENT,
    17             REHABILITATION, CONSTRUCTION AND LAND
    18             ACQUISITION NECESSARY FOR A
    19             COMPREHENSIVE ECONOMIC
    20             DEVELOPMENT/COMMUNITY DEVELOPMENT
    21             INITIATIVE FOR MUNICIPALITIES LOCATED
    22             ALONG THE ROUTE 6 CORRIDOR                 10,000,000
    23         (B)  INFRASTRUCTURE AND OTHER RELATED COSTS
    24             ASSOCIATED WITH THE ADDITION OF THE
    25             STATE-OF-THE-ART 63-SLICE CT SCANNER
    26             THAT PROVIDES THE ONLY SIGNIFICANT
    27             DIAGNOSTIC CAPABILITY OF ITS KIND IN
    28             THE REGION FOR BRADFORD REGIONAL
    29             MEDICAL CENTER                                700,000
    30         (C)  ACQUISITION AND INFRASTRUCTURE RELATED
    20070H1589B2829                 - 142 -    

     1             TO THE CONSTRUCTION OF THE ROUTE 219
     2             VISITOR/DISCOVERY CENTER                    8,200,000
     3     (II)  CITY OF BRADFORD
     4         (A)  RECREATIONAL FACILITY IMPROVEMENTS,
     5             INCLUDING THE RENOVATION OF THE KESSEL
     6             ATHLETIC COMPLEX, CONSTRUCTION OF A NEW
     7             URBAN TRAIL SYSTEM AND IMPROVEMENTS AND
     8             REPAIRS TO THE ICE RINK FACILITY
     9             LOCATED IN CALLAHAN PARK                    5,000,000
    10         (B)  DOWNTOWN REDEVELOPMENT, INCLUDING THE
    11             RENOVATION OF TWO MAJOR DOWNTOWN
    12             BUILDINGS, GATEWAY ENTRANCE AND
    13             DOWNTOWN STREETSCAPE IMPROVEMENTS AND
    14             THE REVITALIZATION OF A CITY
    15             NEIGHBORHOOD THROUGH PROPERTY
    16             ACQUISITION, DEMOLITION, REDEVELOPMENT
    17             AND RELATED INFRASTRUCTURE
    18             IMPROVEMENTS                                5,000,000
    19     (III)  FOSTER TOWNSHIP
    20         (A)  ENVIRONMENTAL MITIGATION AND
    21             INFRASTRUCTURE IMPROVEMENTS, INCLUDING
    22             THE INSTALLATION OF NEW UTILITIES AND
    23             ROADWAYS AT LAFFERTY HOLLOW INDUSTRIAL
    24             PARK                                        1,500,000
    25     (IV)  KANE BOROUGH
    26         (A)  CONSTRUCTION OF A STATE-OF-THE-ART
    27             WOMEN'S DIAGNOSTIC BREAST CENTER,
    28             INCLUDING INFRASTRUCTURE IMPROVEMENTS
    29             AT KANE COMMUNITY HOSPITAL                  1,600,000
    30  (43)  Mercer County
    20070H1589B2829                 - 143 -    

     1     (i)  County projects (Reserved)                                <--
     2     (I)  COUNTY PROJECTS                                           <--
     3         (A)  INFRASTRUCTURE IMPROVEMENTS AND
     4             UTILITY EXTENSIONS WITHIN THE REYNOLDS
     5             EAST BUSINESS PARK, A KEYSTONE
     6             OPPORTUNITY EXPANSION ZONE, AS PART OF
     7             THE PHASE II REDEVELOPMENT PROJECT            600,000
     8         (B)  CONSTRUCTION OF A NEW MAGISTERIAL
     9             DISTRICT COURT FACILITY ALONG
    10             BARKEYVILLE ROAD IN PINE TOWNSHIP             625,000
    11         (C)  CONSTRUCTION OF A NEW, MODERN,
    12             MULTITENANT BUILDING IN THE REYNOLDS
    13             EAST BUSINESS PARK, A KEYSTONE
    14             OPPORTUNITY EXPANSION ZONE                  1,000,000
    15     (ii)  City of Sharon
    16         (A)  Acquisition, construction,
    17             infrastructure and other related costs
    18             for downtown Sharon revitalization          3,000,000
    19     (iii)  City of Hermitage
    20         (A)  Construction, infrastructure and other
    21             costs associated with the Buhl Park
    22             Community Center renovation                 1,500,000  <--
    23             COMMUNITY CENTER RENOVATION                 3,000,000  <--
    24     (iv)  Greenville Borough
    25         (A)  Redevelopment of various industrial
    26             properties, including construction          3,000,000
    27         (B)  Construction costs related to the
    28             expansion of the Greenville Borough
    29             building                                      625,000
    30  (44)  Mifflin County (Reserved)                                   <--
    20070H1589B2829                 - 144 -    

     1  (44)  MIFFLIN COUNTY                                              <--
     2     (I)  COUNTY PROJECTS (RESERVED)
     3     (II)  GRANVILLE TOWNSHIP
     4         (A)  ACQUISITION, CONSTRUCTION,
     5             INFRASTRUCTURE AND REDEVELOPMENT OF A
     6             316-ACRE EXPANSION TO MIFFLIN COUNTY
     7             INDUSTRIAL PARK, INCLUDING ACCESS ROAD,
     8             WATER, SEWER, GAS, ELECTRIC, RAILROAD
     9             AND FIBER OPTIC EXTENSION AND
    10             CONNECTIONS                                 5,000,000
    11         (B)  INFRASTRUCTURE, CONSTRUCTION AND OTHER
    12             RELATED COSTS FOR IMPROVEMENTS AND
    13             EXPANSION OF THE GRANVILLE TOWNSHIP
    14             SEWAGE TREATMENT FACILITIES DIRECTLY
    15             RELATED TO THE MIFFLIN COUNTY
    16             INDUSTRIAL PARK EXPANSION PROJECT           5,000,000
    17     (III)  MIFFLIN COUNTY INDUSTRIAL REDEVELOPMENT
    18         CORPORATION
    19         (A)  CONSTRUCTION AND INFRASTRUCTURE FOR
    20             MIXED-USE DEVELOPMENT OF 162 ACRES
    21             ALONG ROUTE 322 NEAR THE BURNHAM
    22             INTERCHANGE                                 5,000,000
    23         (B)  ACQUISITION, CONSTRUCTION,
    24             INFRASTRUCTURE AND REDEVELOPMENT OF A
    25             316-ACRE EXPANSION TO MIFFLIN COUNTY
    26             INDUSTRIAL PARK, INCLUDING ACCESS ROAD,
    27             WATER, SEWER, GAS, ELECTRIC, RAILROAD
    28             AND FIBER OPTIC EXTENSION AND
    29             CONNECTIONS                                 5,000,000
    30         (C)  RENOVATIONS, INCLUDING REMEDIATION,
    20070H1589B2829                 - 145 -    

     1             BUILDING REDEVELOPMENT AND
     2             INFRASTRUCTURE IMPROVEMENTS IN THE
     3             MIFFLIN COUNTY INDUSTRIAL DEVELOPMENT
     4             CORPORATION PLAZA, A BROWNFIELD SITE        5,000,000
     5         (D)  EXPANSION OF UTILITIES AND
     6             INFRASTRUCTURE TO THE 316-ACRE MIFFLIN
     7             COUNTY INDUSTRIAL PARK                     10,000,000
     8         (E)  ACQUISITION AND PREPARATION FOR
     9             REDEVELOPMENT OF BLIGHTED PROPERTIES
    10             WITHIN THE DESIGNATED ELM STREET
    11             SECTION OF LEWISTOWN BOROUGH                1,000,000
    12         (F)  ACQUISITION, EXTENSION OF
    13             INFRASTRUCTURE AND ROADS AND BUILDING
    14             REDEVELOPMENT OF THE FORMER CASE NEW
    15             HOLLAND FACILITY                            5,000,000
    16  (45)  Monroe County
    17     (i)  County projects
    18         (A)  Acquisition, construction,
    19             infrastructure and other related costs
    20             for the East Stroudsburg School
    21             District Memorial Stadium                   1,870,000
    22         (B)  ACQUISITION, INFRASTRUCTURE                           <--
    23             IMPROVEMENTS AND CONSTRUCTION OF THE
    24             MONROE COUNTY FAMILY HEALTH CENTER          2,000,000
    25         (C)  ACQUISITION, CONSTRUCTION AND OTHER
    26             RELATED COSTS FOR THE POCONO MOUNTAINS
    27             WAYFINDING PROGRAM, CONSISTING OF A
    28             NETWORK OF DIRECTIONAL SIGNS TO GUIDE
    29             THE TRAVELING PUBLIC                        1,000,000
    30         (D)  ACQUISITION, INFRASTRUCTURE,
    20070H1589B2829                 - 146 -    

     1             CONSTRUCTION AND OTHER RELATED COSTS
     2             FOR THE CONSTRUCTION OF A 10,000-
     3             SQUARE-FOOT VISITORS CENTER ON ROUTE 6
     4             ADJACENT TO PALMYRA TOWNSHIP BEACH          2,000,000
     5         (E)  LAND ACQUISITION, INFRASTRUCTURE
     6             IMPROVEMENTS AND CONSTRUCTION NECESSARY
     7             TO MAINTAIN THE COMPETITIVE POSITION OF
     8             AN EXISTING BUSINESS ENTITY OR FOR THE
     9             DEVELOPMENT OF BUSINESS-READY SITES FOR
    10             POTENTIAL BUSINESS TENANTS                  1,000,000
    11     (ii)  Coolbaugh Township
    12         (A)  Acquisition, construction,
    13             infrastructure and other related costs
    14             for the Pocono Mountain Public Library
    15             Building                                    1,000,000
    16         (B)  Acquisition, construction,                            <--
    17             infrastructure and other related costs
    18             for the Pocono Mountains Corporate
    19             Center East                                 2,000,000
    20         (C) (B)  Acquisition, construction,                        <--
    21             infrastructure and other related costs
    22             for the Pocono Mountains Corporate
    23             Center East                                 4,000,000
    24         (D) (C)  Acquisition, construction,                        <--
    25             infrastructure and other related costs
    26             for the Commerce Court Extension            1,250,000
    27         (E) (D)  Acquisition, construction,                        <--
    28             infrastructure and other related costs
    29             for the Pocono Mountain Economic
    30             Development Rail Served Business Park       2,000,000
    20070H1589B2829                 - 147 -    

     1     (II.1)  DELAWARE WATER GAP BOROUGH                             <--
     2         (A)  RESTORATION OF THE DELAWARE WATER GAP
     3             RAILROAD STATION                              500,000
     4         (B)  RESTORATION, INFRASTRUCTURE
     5             IMPROVEMENTS AND CONSTRUCTION OF THE
     6             CASTLE INN                                  1,000,000
     7         (C)  RESTORATION, INFRASTRUCTURE
     8             IMPROVEMENTS AND CONSTRUCTION OF THE
     9             LAIRD TECHNOLOGY BUILDING                   6,000,000
    10     (II.2)  DELAWARE WATER GAP BOROUGH, EAST
    11         STROUDSBURG BOROUGH, STROUDSBURG BOROUGH,
    12         SMITHFIELD TOWNSHIP AND STROUD TOWNSHIP
    13         (A)  INFRASTRUCTURE IMPROVEMENTS FOR
    14             TELECOMMUNICATIONS FOR BUSINESS SITES       2,000,000
    15     (iii)  East Stroudsburg Borough
    16         (A)  Infrastructure and other related costs
    17             to renovate East Stroudsburg High
    18             School Memorial Stadium                     3,000,000
    19         (B)  Construction, acquisition,                            <--
    20             infrastructure, redevelopment and other
    21             costs related to the Pocono Mountains
    22             Regional Convention Center                 37,500,000
    23         (B)  DEMOLITION AND CONSTRUCTION OF THE                    <--
    24             INTERNATIONAL BOILER WORKS BUILDINGS        1,800,000
    25     (iv)  East Stroudsburg Township
    26         (A)  Acquisition, construction,
    27             infrastructure and other related costs
    28             for a parking garage adjacent to Pocono
    29             Medical Center                             10,000,000
    30         (B)  Construction of Computer Security
    20070H1589B2829                 - 148 -    

     1             Research Center at East Stroudsburg
     2             University Research and Technology
     3             Park                                        2,000,000
     4         (C)  CONSTRUCTION AND INFRASTRUCTURE                       <--
     5             IMPROVEMENTS FOR THE WORLD-CLASS
     6             SYNCHRONOUS DATA CENTER                     3,000,000
     7     (v)  East Stroudsburg, Stroudsburg and Middle
     8         Smithfield Townships
     9         (A)  Acquisition, construction,
    10             infrastructure and other related costs
    11             for rehabilitation of East Stroudsburg
    12             to Delaware Water Lap GAP Rail Line         1,250,000  <--
    13     (VI)  PALMYRA TOWNSHIP                                         <--
    14         (A)  INFRASTRUCTURE IMPROVEMENTS AND
    15             CONSTRUCTION OF THE LAKE WALLENPAUPACK
    16             VISITORS CENTER                             2,000,000
    17     (VII)  PARADISE TOWNSHIP
    18         (A)  ACQUISITION OF A FISH HATCHERY FOR A
    19             PARK AND EDUCATIONAL CENTER                 1,500,000
    20     (vi) (VIII)  Pocono, Paradise and Jackson                      <--
    21         Townships
    22         (A)  Construction of bathrooms for persons
    23             with disabilities, field improvements
    24             and related infrastructure for
    25             Challenger Program                            100,000
    26     (IX)  SMITHFIELD TOWNSHIP                                      <--
    27         (A)  CONSTRUCTION, ACQUISITION,
    28             INFRASTRUCTURE, REDEVELOPMENT AND OTHER
    29             COSTS RELATED TO THE POCONO MOUNTAINS
    30             REGIONAL CONVENTION CENTER                 37,500,000
    20070H1589B2829                 - 149 -    

     1     (vii) (X)  Stroudsburg Borough                                 <--
     2         (A)  Acquisition, restoration and expansion
     3             of the Sherman Theater                      1,500,000  <--
     4             OF THE SHERMAN THEATER                      3,000,000  <--
     5         (B)  ACQUISITION AND RENOVATIONS TO
     6             DOWNTOWN STROUDSBURG HOTEL AND
     7             CONSTRUCTION OF ASSOCIATED PARKING
     8             GARAGE                                      5,000,000
     9         (C)  RENOVATIONS OF ROSS-STULGAITIS
    10             STADIUM                                     1,000,000
    11     (XI)  POCONO MOUNTAINS ECONOMIC DEVELOPMENT
    12         CORPORATION
    13         (A)  TELECOMMUNICATIONS INFRASTRUCTURE
    14             PROJECTS IN MIDDLE SMITHFIELD AND PRICE
    15             TOWNSHIPS                                   2,000,000
    16         (B)  ACQUISITION, INFRASTRUCTURE AND OTHER
    17             RELATED COSTS FOR THE REDEVELOPMENT OF
    18             SITES ON THE WEST END OF MONROE COUNTY      2,500,000
    19  (46)  Montgomery County
    20     (i)  County projects (Reserved)                                <--
    21     (I)  COUNTY PROJECTS                                           <--
    22         (A)  ACQUISITION, CONSTRUCTION,
    23             INFRASTRUCTURE AND OTHER RELATED COSTS
    24             FOR THE MONTGOMERY COUNTY EXPO CENTER      19,000,000
    25         (B)  INFRASTRUCTURE IMPROVEMENTS AND
    26             CONSTRUCTION FOR THE MANOR COLLEGE
    27             DENTAL HEALTH CENTER                          500,000
    28     (ii)  Abington Township
    29         (A)  Acquisition, construction and other
    30             related costs for the renovation of the
    20070H1589B2829                 - 150 -    

     1             Abington Community Center                   1,000,000
     2         (B)  Acquisition, construction and other
     3             related costs to develop a civic
     4             facility as part of the Roslyn
     5             Redevelopment Program                      12,000,000
     6         (C)  Construction and other related costs
     7             for the renovation of the Ardsley
     8             Community Center                            1,000,000
     9     (iii)  Ambler Borough
    10         (A)  Construction and other related costs
    11             for the redevelopment of Main Street       10,000,000
    12         (B)  CONSTRUCTION, RENOVATION,                             <--
    13             INFRASTRUCTURE AND OTHER RELATED COSTS
    14             OF A NEW FIREHOUSE                          2,000,000
    15         (C)  ACQUISITION, SITE PREPARATION AND
    16             OTHER RELATED COSTS FOR REDEVELOPMENT
    17             OF KEASBEY AND MATTISON SITE, A
    18             RESIDENTIAL DEVELOPMENT                     7,500,000
    19         (D)  CONSTRUCTION AND RENOVATIONS FOR THE
    20             KEASBEY AND MATTISON BOILER HOUSE
    21             PROJECT                                     2,000,000
    22     (III.1)  BALA CYNWYD
    23         (A)  CONSTRUCTION AND LAND DEVELOPMENT
    24             PROJECT AT 211 BELMONT AVENUE              11,000,000
    25     (III.2)  BRIDGEPORT BOROUGH
    26         (A)  INFRASTRUCTURE IMPROVEMENTS,
    27             CONSTRUCTION AND RELATED COSTS
    28             ASSOCIATED WITH BRIDGEVIEW DEVELOPMENT      4,500,000
    29     (III.3)  CHELTENHAM TOWNSHIP
    30         (A)  CONSTRUCTION OF EXPANSION OF
    20070H1589B2829                 - 151 -    

     1             SETTLEMENT MUSIC SCHOOL, INCLUDING
     2             PARKING FACILITY                            3,000,000
     3         (B)  CONSTRUCTION OF BUNKER FOR MCKINLEY
     4             FIRE COMPANY                                  500,000
     5         (C)  CONSTRUCTION OF BUNKER FOR LAMOTT FIRE
     6             COMPANY                                       500,000
     7         (D)  CONSTRUCTION OF PATIENT CENTER FOR
     8             HOPE LODGE CANCER FACILITY                  1,200,000
     9         (E)  ENGINEERING AND CONSTRUCTION OF
    10             CRESHEIM MULTIUSE TRAIL BETWEEN VALLEY
    11             GREEN IN FAIRMONT PARK IN PHILADELPHIA
    12             AND FORT WASHINGTON STATE PARK              2,500,000
    13     (III.4)  CONSHOHOCKEN BOROUGH
    14         (A)  INFRASTRUCTURE IMPROVEMENTS AND
    15             HAZARDOUS MATERIALS ABATEMENT FOR THE
    16             LEELAND MANSION PROJECT                     2,250,000
    17     (III.5)  GLENSIDE
    18         (A)  DEVELOPMENT AND CONSTRUCTION OF
    19             ARCADIA UNIVERSITY CAMPUS COMMONS AND
    20             PARKING FACILITY                            2,000,000
    21     (iv)  Green Lane Borough
    22         (A)  Green Lane Borough sidewalk
    23             installation                                  750,000
    24     (v)  Jenkintown Borough
    25         (A)  Construction and other related costs
    26             for the Southern Gateway multilevel
    27             parking garage                              6,000,000
    28     (vi)  Lansdale Borough
    29         (A)  Infrastructure and other related costs
    30             for the construction of a multipurpose
    20070H1589B2829                 - 152 -    

     1             senior community center                     1,000,000
     2         (B)  CONSTRUCTION OF PHASE II OF THE                       <--
     3             LANSDALE PERFORMING ARTS CENTER,
     4             INCLUDING ADDITIONS AND RENOVATIONS TO
     5             THE FORMER MASONIC HALL                     3,300,000
     6     (vii)  Limerick Township
     7         (A)  Construction of a child care center at
     8             the Spring Valley YMCA, including land
     9             acquisition                                 2,500,000
    10     (VII.1)  LOWER GWYNEDD TOWNSHIP                                <--
    11         (A)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
    12             COSTS ASSOCIATED WITH THE DOWNTOWN
    13             STREETSCAPE IMPROVEMENT AND
    14             BEAUTIFICATION PROJECT                        500,000
    15     (VII.2)  LOWER MERION TOWNSHIP
    16         (A)  INFRASTRUCTURE DEVELOPMENT AND
    17             CONSTRUCTION FOR 211 BELMONT PROJECT        4,000,000
    18         (B)  ACQUISITION, INFRASTRUCTURE
    19             IMPROVEMENTS, CONSTRUCTION AND RELATED
    20             COSTS FOR THE SAINT JOSEPH'S UNIVERSITY
    21             CAMPUS-WIDE PROJECTS                       15,000,000
    22         (C)  RENOVATIONS AND CONSTRUCTION FOR
    23             GLADWYNE LIBRARY                            2,000,000
    24     (viii)  Lower Providence Township
    25         (A)  Restoration of John James Audubon
    26             Center, including construction and
    27             related infrastructure                      6,000,000
    28     (ix)  Marlborough Township
    29         (A)  Acquisition, related infrastructure
    30             and restoration of Wetzel's Mill and
    20070H1589B2829                 - 153 -    

     1             Unami Creek Park area, including
     2             construction                                1,000,000
     3     (x)  Norristown Borough
     4         (A)  Acquisition, construction,
     5             infrastructure and other related costs
     6             for the Cultural Arts Center                3,000,000
     7         (B)  ACQUISITION, REDEVELOPMENT AND                        <--
     8             CONSTRUCTION OF THE LOGAN SQUARE
     9             ENTERPRISE/REDEVELOPMENT AREA              10,000,000
    10         (C)  ACQUISITION, DEMOLITION,
    11             INFRASTRUCTURE IMPROVEMENTS AND
    12             CONSTRUCTION OF THE STONEY CREEK MIXED-
    13             INCOME HOUSING DEVELOPMENT                  2,000,000
    14         (D)  ACQUISITION, INFRASTRUCTURE
    15             IMPROVEMENTS AND CONSTRUCTION OF THE
    16             NICOLET COMPLEX                             3,500,000
    17         (E)  LAND ACQUISITION, INFRASTRUCTURE
    18             IMPROVEMENTS AND CONSTRUCTION FOR THE
    19             RIVERFRONT REDEVELOPMENT DISTRICT
    20             PROJECT                                     5,000,000
    21         (F)  REDEVELOPMENT AND REVITALIZATION OF
    22             THE LOGAN SQUARE
    23             ENTERPRISE/REDEVELOPMENT AREA              10,000,000
    24     (xi)  Pennsburg, Red Hill and Green Lane
    25         Boroughs, Marlborough and Upper Hanover
    26         Townships
    27         (A)  Construction, infrastructure, land
    28             acquisition and other related costs for
    29             the Greater Upper Perkiomen Valley
    30             Economic Development Project                2,000,000
    20070H1589B2829                 - 154 -    

     1     (xii)  Red Hill Borough
     2         (A)  Expansion of Upper Perkiomen Valley
     3             Public Library, including
     4             infrastructure and other related costs      1,000,000
     5     (xiii)  Upper Hanover Township
     6         (A)  Acquisition, construction and related
     7             infrastructure for Upper Perkiomen
     8             Valley YMCA                                 4,000,000
     9         (B)  Construction of outpatient medical
    10             facility and medical office building at
    11             St. Luke's Quakertown Hospital,
    12             including related infrastructure            1,000,000
    13     (XIV)  UPPER MERION TOWNSHIP                                   <--
    14         (A)  INFRASTRUCTURE IMPROVEMENTS AND
    15             CONSTRUCTION FOR CORSAIR II                 5,000,000
    16         (B)  ACQUISITION, CONSTRUCTION,
    17             INFRASTRUCTURE, REDEVELOPMENT AND OTHER
    18             COSTS RELATED TO THE UPPER MERION
    19             RECREATIONAL FACILITY                       4,000,000
    20     (XV)  UPPER MORELAND TOWNSHIP
    21         (A)  CONSTRUCTION AND DEVELOPMENT OF A
    22             MULTIPURPOSE LIGHTED SYNTHETIC TURF
    23             ATHLETIC FIELD                                500,000
    24     (xiv) (XVI)  West Norriton Township                            <--
    25         (A)  Acquisition and related costs for the
    26             construction of the Audubon area YMCA       3,000,000
    27     (XVII)  MONTGOMERY COUNTY INDUSTRIAL                           <--
    28         DEVELOPMENT AUTHORITY
    29         (A)  SITE PREPARATION, CONSTRUCTION AND
    30             INFRASTRUCTURE IMPROVEMENTS FOR
    20070H1589B2829                 - 155 -    

     1             ECONOMIC DEVELOPMENT AT RUTH AND
     2             CLEMENS ROADS, LOWER SALFORD TOWNSHIP       5,000,000
     3         (B)  LAND ACQUISITION, INFRASTRUCTURE AND
     4             CONSTRUCTION OF A NEW ALMAC FACILITY
     5             FOR ECONOMIC DEVELOPMENT AT FRETZ AND
     6             WAMBOLD                                    20,000,000
     7  (47)  Montour County (Reserved)
     8  (48)  Northampton County
     9     (i)  County projects
    10         (A)  Construction, redevelopment and other
    11             related costs to build the SteelSax
    12             Performing Arts and Broadcast
    13             Center/Events Center                       12,000,000
    14         (B)  INFRASTRUCTURE IMPROVEMENTS,                          <--
    15             RENOVATIONS AND CONSTRUCTION FOR THE
    16             LEHIGH HEAVY FORGE COMPANY INDUSTRIAL
    17             AREA                                       10,000,000
    18         (C)  LAND ACQUISITION, INFRASTRUCTURE
    19             IMPROVEMENTS AND CONSTRUCTION NECESSARY
    20             TO MAINTAIN THE COMPETITIVE POSITION OF
    21             AN EXISTING BUSINESS ENTITY OR FOR THE
    22             DEVELOPMENT OF BUSINESS-READY SITES FOR
    23             POTENTIAL BUSINESS TENANTS                  1,000,000
    24     (II)  PEN ARGYL BOROUGH
    25         (A)  INFRASTRUCTURE IMPROVEMENTS AND
    26             CONSTRUCTION OF WEONA PARK POOL AND
    27             BATH HOUSE FACILITY                        10,000,000
    28         (B)  LAND ACQUISITION, INFRASTRUCTURE
    29             IMPROVEMENTS AND CONSTRUCTION OF A
    30             GOVERNMENT CENTER/FIRE STATION              5,000,000
    20070H1589B2829                 - 156 -    

     1     (III)  BANGOR BOROUGH
     2         (A)  ACQUISITION, INFRASTRUCTURE
     3             IMPROVEMENTS AND CONSTRUCTION OF A
     4             GARAGE AND SALT STORAGE FACILITY            2,500,000
     5         (B)  ACQUISITION AND CONSTRUCTION OF A
     6             MUNICIPAL COMPLEX                           5,000,000
     7         (C)  ACQUISITION AND RENOVATIONS TO THE
     8             COLONIAL HOTEL                                500,000
     9         (D)  RENOVATIONS OF THE TRUST BUILDING            500,000
    10     (IV)  CITY OF BETHLEHEM
    11         (A)  CONSTRUCTION OF SOUTH MAIN STREET
    12             PARKING GARAGE                              5,000,000
    13         (B)  CONSTRUCTION OF 4TH AND BROADWAY
    14             PARKING GARAGE                              3,000,000
    15         (C)  ACQUISITION, INFRASTRUCTURE
    16             IMPROVEMENTS AND CONSTRUCTION OF THE
    17             FARR BUILDING                               1,000,000
    18         (D)  RENOVATIONS AND CONSTRUCTION OF THE
    19             STOCK HOUSE VISITORS CENTER                 1,000,000
    20         (E)  RENOVATIONS TO THE FOWLER FAMILY
    21             SOUTHSIDE CENTER, NORTHAMPTON COMMUNITY
    22             COLLEGE                                     1,000,000
    23         (F)  INFRASTRUCTURE IMPROVEMENTS AND
    24             CONSTRUCTION OF LEHIGH UNIVERSITY
    25             SCIENCE AND TECHNOLOGY INFRASTRUCTURE      10,000,000
    26         (G)  CONSTRUCTION, REDEVELOPMENT AND OTHER
    27             RELATED COSTS TO BUILD A FACILITY TO
    28             EMPLOY PERSONS WITH DISABILITIES              500,000
    29     (V)  BETHLEHEM TOWNSHIP
    30         (A)  ACQUISITION, INFRASTRUCTURE
    20070H1589B2829                 - 157 -    

     1             IMPROVEMENTS AND CONSTRUCTION FOR THE
     2             ST. LUKE'S RIVERSIDE HEALTH CAMPUS         15,000,000
     3         (B)  RENOVATIONS AND INFRASTRUCTURE
     4             IMPROVEMENTS TO THE BOILER AND COOLING
     5             TOWERS, NORTHAMPTON COMMUNITY COLLEGE         500,000
     6         (C)  RENOVATIONS AND EXPANSION OF THE
     7             AUTOMOTIVE TECHNOLOGY PROGRAM FACILITY,
     8             NORTHAMPTON COMMUNITY COLLEGE               1,000,000
     9     (VI)  CITY OF EASTON
    10         (A)  ACQUISITION, REDEVELOPMENT AND
    11             CONSTRUCTION OF A PARKING GARAGE TO
    12             SERVE THE BUSINESS DISTRICT, BUSHKILL
    13             CREEK AND LAFAYETTE COLLEGE AREAS           2,250,000
    14         (B)  INFRASTRUCTURE, REDEVELOPMENT AND
    15             CONSTRUCTION OF A NORTHAMPTON COUNTY
    16             GOVERNMENT CENTER PARKING GARAGE            3,500,000
    17         (C)  RENOVATION OF A COMMERCIAL FACILITY
    18             AND CONSTRUCTION OF EXHIBITS FOR THE
    19             NORTHAMPTON COUNTY HISTORICAL AND
    20             GENEALOGICAL SOCIETY MUSEUM                 4,500,000
    21         (D)  INFRASTRUCTURE, DEMOLITION,
    22             CONSTRUCTION AND OTHER RELATED COSTS
    23             FOR THE DELAWARE TERRACE AND DELAWARE
    24             TERRACE ANNEX COMMUNITY DEVELOPMENT
    25             PROJECT, CONSISTING OF REHABILITATION
    26             OF A BLIGHTED HOUSING COMPLEX               2,000,000
    27         (E)  CONSTRUCTION OF A MULTILEVEL PARKING
    28             GARAGE IN THE VICINITY OF THE
    29             NORTHAMPTON COUNTY COURTHOUSE               5,000,000
    30     (VII)  GLENDON BOROUGH
    20070H1589B2829                 - 158 -    

     1         (A)  CONSTRUCTION OF INFRASTRUCTURE TO
     2             SERVE INDUSTRIAL PARK AND COMMUNITY
     3             DEVELOPMENT                                   500,000
     4     (VIII)  NORTH CATASAUQUA BOROUGH
     5         (A)  RENOVATIONS OF BOROUGH HALL SENIOR
     6             CENTER AND COMMUNITY MULTIPURPOSE
     7             FACILITIES                                    500,000
     8     (ii) (IX)  Palmer Township                                     <--
     9         (A)  Acquisition, construction and other
    10             related costs for the National High
    11             School Sports Hall of Fame Museum           5,000,000
    12         (B)  INFRASTRUCTURE AND CONSTRUCTION OF AN                 <--
    13             INTERCHANGE AT THE INTERSECTION OF
    14             ROUTE 33 AND MAIN STREET IN PALMER
    15             TOWNSHIP                                   14,000,000
    16         (C)  SITE PREPARATION, INFRASTRUCTURE AND
    17             CONSTRUCTION OF FACILITIES FOR
    18             COMMERCIAL AND INDUSTRIAL USE              15,000,000
    19     (X)  WILSON BOROUGH
    20         (A)  INFRASTRUCTURE, SITE PREPARATION AND
    21             REMEDIATION, REHABILITATION AND
    22             HISTORIC RECONSTRUCTION FOR COMMUNITY
    23             DEVELOPMENT                                 5,000,000
    24         (B)  ACQUISITION, INFRASTRUCTURE
    25             IMPROVEMENTS AND CONSTRUCTION OF DIXIE
    26             LOFTS                                       5,000,000
    27  (49)  Northumberland County
    28     (i)  County projects (Reserved)
    29     (ii)  Milton Borough
    30         (A)  Acquisition, construction,
    20070H1589B2829                 - 159 -    

     1             infrastructure and other related costs
     2             for a new Milton Public Library             1,000,000
     3         (B)  INFRASTRUCTURE, REHABILITATION AND                    <--
     4             CONSTRUCTION FOR IMPROVEMENTS TO MARSH
     5             ROAD IN THE VICINITY OF THE MILTON AREA
     6             INDUSTRIAL PARK                             2,000,000
     7     (iii)  Point Township
     8         (A)  Acquisition, construction,
     9             infrastructure and other related costs
    10             for a renewable energy plant                1,000,000
    11         (B)  Construction and other related costs
    12             for the SunPoint Renewable Energy
    13             Project                                     1,000,000  <--
    14             PROJECT, INCLUDING ANY NECESSARY                       <--
    15             TRANSPORTATION-RELATED INFRASTRUCTURE
    16             IMPROVEMENTS                                3,000,000
    17     (IV)  CITY OF SHAMOKIN
    18         (A)  CONSTRUCTION OF A MINING TECHNOLOGY
    19             AND TRAINING CENTER                         2,000,000
    20  (50)  Perry County
    21     (i)  County projects (Reserved)
    22     (ii)  Penn Township
    23         (A)  Construction of new facility to house
    24             preschool program and after school
    25             program at the Early Education Center         500,000
    26     (iii)  Spring Township
    27         (A)  Audubon Hawk Watch expansion,
    28             including construction of viewing area
    29             for persons with disabilities and
    30             related infrastructure improvements           275,000
    20070H1589B2829                 - 160 -    

     1  (51)  Philadelphia County
     2     (i)  County projects
     3         (A)  Construction, infrastructure and other
     4             related costs for the expansion and
     5             rehabilitation of Children's Crisis
     6             Treatment Center                            4,000,000
     7     (ii)  City of Philadelphia
     8         (A)  Construction and other related costs
     9             for the University of Pennsylvania
    10             Research Center                            16,000,000
    11         (B)  Redevelopment and other costs related
    12             to the Inter-Community Development
    13             Corporation northwest neighborhood
    14             streetscape improvements                    1,500,000
    15         (C)  Construction, redevelopment and other
    16             costs associated with the Academy of
    17             Natural Science Exhibit                       500,000
    18         (D)  Construction, infrastructure,
    19             redevelopment and other related costs
    20             to upgrade and renovate the Curtis
    21             Institute for Music                        20,000,000
    22         (E)  Construction and other related costs
    23             for the Nueva Jerusalem mixed-use
    24             facility                                    1,500,000
    25         (F)  Construction, infrastructure and other
    26             related costs for the Pastore Unidos
    27             Por Filadelfia project related to
    28             minority and senior programming               500,000
    29         (G)  Construction and other related costs
    30             for the renovation and expansion of the
    20070H1589B2829                 - 161 -    

     1             Columbia North Community YMCA               3,600,000
     2         (H)  Construction, infrastructure and other
     3             related costs for the Betsy Ross House        500,000
     4         (I)  Infrastructure and other costs related
     5             to the Hunting Park 21st Century
     6             Community and Learning Center               1,000,000
     7         (J)  Construction, infrastructure and other
     8             related costs for the Stenton Service
     9             Wing Restoration Project                    1,000,000
    10         (K)  Construction, redevelopment and other
    11             costs related to the new Pleasant
    12             Playground building                         1,000,000
    13         (L)  Construction, acquisition, demolition
    14             and other costs associated with South
    15             Philadelphia Service Housing               10,000,000
    16         (M)  Construction and other related costs
    17             for the renovation of International
    18             House                                       8,000,000
    19         (N)  Acquisition, construction and other
    20             related costs for the redevelopment of
    21             the Historic John Grass Company
    22             Building                                      700,000
    23         (O)  Construction, infrastructure and other
    24             related costs for the Norris Square
    25             Children's Center                             500,000
    26         (P)  Construction and other related costs
    27             for North Philadelphia retail
    28             corridors                                   4,000,000
    29         (Q)  Construction, infrastructure and other
    30             related costs for a regional emergency
    20070H1589B2829                 - 162 -    

     1             services facility                          30,000,000
     2         (R)  Construction, infrastructure and other
     3             related costs for North Philadelphia
     4             recreation                                  5,000,000
     5         (S)  Acquisition, construction and other
     6             related costs for the Philadelphia
     7             Polytechnic Charter High School            10,000,000
     8         (T)  Construction and other related costs
     9             for the development of a skate park at
    10             Paine Park                                  2,750,000
    11         (U)  Construction and other related costs
    12             for improvements to the Friends Housing
    13             Cooperative Foundation facilities             250,000
    14         (V)  Acquisition, construction,
    15             infrastructure and other related costs
    16             for Chester Avenue revitalization           1,000,000
    17         (W)  Acquisition, construction,
    18             infrastructure and other related costs
    19             to revitalize the Market Street
    20             Corridor, including adjacent areas         30,000,000
    21         (X)  Construction, infrastructure and other
    22             related costs for the Children's Zoo        8,200,000
    23         (Y)  Construction, infrastructure and other
    24             related costs for the McNeil Aviary         6,000,000
    25         (Z)  Construction, infrastructure and other
    26             related costs for the Philadelphia Zoo
    27             Big Cat exhibit                             5,800,000
    28         (AA)  Construction and other related costs
    29             for the Washington Square
    30             redevelopment                               1,000,000
    20070H1589B2829                 - 163 -    

     1         (BB)  Construction of new facilities for
     2             the Wellness Community's National
     3             Survivorship Research and Training
     4             Institute                                   5,000,000
     5         (CC)  For existing building, gallery,
     6             exhibit construction and renovations
     7             including climate control, electric
     8             upgrades, technology upgrades and
     9             infrastructure                             15,000,000
    10         (DD)  For construction of new building for
    11             the Franklin Institute                     15,000,000
    12         (EE)  Rehabilitation and expansion of the
    13             Main Service Center at the Children's
    14             Crisis Treatment Center, including
    15             construction                                4,000,000
    16         (FF)  Acquisition, construction,
    17             infrastructure and other costs related
    18             to the expansion of the Fox Chase
    19             Recreational Center                         1,200,000
    20         (GG)  CONSTRUCTION OF COMMUNITY ACTIVITY                   <--
    21             CENTER AT LASALLE COLLEGE HIGH SCHOOL       2,000,000
    22         (HH)  CONSTRUCTION OF AN EDUCATIONAL
    23             CONFERENCE CENTER AT THE CRANALEITH
    24             SPIRITUAL CENTER                            1,000,000
    25         (II)  EXPANSION OF THE CRISIS CENTER AT
    26             COVENANT HOUSE PENNSYLVANIA                 2,000,000
    27         (JJ)  DEMOLITION, INFRASTRUCTURE
    28             IMPROVEMENTS, RENOVATIONS AND
    29             CONSTRUCTION FOR UNIVERSITY OF
    30             PENNSYLVANIA LAW SCHOOL BUILDING            1,000,000
    20070H1589B2829                 - 164 -    

     1         (KK)  DESIGN, ENGINEERING AND CONSTRUCTION
     2             OF A PEDESTRIAN OVERPASS AT THE
     3             INTERSECTION OF SCHUYLKILL RIVER PARK
     4             AND LOCUST STREET                           2,000,000
     5         (LL)  ACQUISITION AND CONSTRUCTION OF ST.
     6             RITA'S CONFERENCE CENTER                    1,000,000
     7         (MM)  CONSTRUCTION OF FAIRMOUNT PARK
     8             AUDUBON CENTER AT STRAWBERRY MANSION        2,500,000
     9         (NN)  INFRASTRUCTURE IMPROVEMENTS,
    10             RENOVATIONS AND CONSTRUCTION OF THE
    11             ATWATER KENT MUSEUM                         1,000,000
    12         (OO)  INFRASTRUCTURE IMPROVEMENTS AND
    13             CONSTRUCTION OF THE HERITAGE CENTER AT
    14             THE UNION LEAGUE BUILDING                   2,000,000
    15         (PP)  DEVELOPMENT AND CONSTRUCTION OF THE
    16             MILL CREEK COMMUNITY CENTER                 8,000,000
    17         (QQ)  INFRASTRUCTURE IMPROVEMENTS,
    18             RENOVATIONS AND CONSTRUCTION FOR THE
    19             MERCY FAMILY CENTER                           500,000
    20         (RR)  RENOVATIONS AND CONSTRUCTION OF THE
    21             MULTIUSE ATHLETIC FACILITY AT CARDINAL
    22             DOUGHERTY HIGH SCHOOL                       1,000,000
    23         (SS)  RENOVATIONS TO THE SULTAN JIHAD AHMAD
    24             COMMUNITY CENTER                            2,300,000
    25         (TT)  ACQUISITION, INFRASTRUCTURE
    26             IMPROVEMENTS, RENOVATIONS AND
    27             CONSTRUCTION FOR THE STEELE HEDDLE
    28             BUILDING DEVELOPMENT PROJECT                5,000,000
    29         (UU)  RENOVATIONS TO THE LOUISE BROOKINS
    30             HUMAN SERVICES BUILDING                       500,000
    20070H1589B2829                 - 165 -    

     1         (VV)  RENOVATIONS AND CONSTRUCTION OF THE
     2             PENROSE RECREATION CENTER                     500,000
     3         (WW)  DEMOLITION, INFRASTRUCTURE
     4             IMPROVEMENTS AND CONSTRUCTION FOR THE
     5             UPTOWN ENTERTAINMENT CENTER                   500,000
     6         (XX)  DEMOLITION, ACQUISITION,
     7             INFRASTRUCTURE IMPROVEMENTS AND
     8             CONSTRUCTION OF THE APM WELLNESS CENTER
     9             AND HEADQUARTERS                            4,000,000
    10         (YY)  CONSTRUCTION OF THE HAVEN PENIEL
    11             SENIOR CITIZENS RESIDENCE                     400,000
    12         (ZZ)  DEMOLITION AND CONSTRUCTION OF THE
    13             MEN AND WOMEN FOR HUMAN EXCELLENCE
    14             FACILITY                                      250,000
    15         (AAA)  EXPANSION OF NORTHEAST PHILADELPHIA
    16             REGIONAL CENTER OF THE COMMUNITY
    17             COLLEGE OF PHILADELPHIA                    10,100,000
    18         (BBB)  CONSTRUCTION OF LUTHERAN ARCHIVES
    19             CENTER                                      1,000,000
    20         (CCC)  ACQUISITION, INFRASTRUCTURE
    21             IMPROVEMENTS, CONSTRUCTION AND RELATED
    22             COSTS FOR EXPANSION OF SAINT JOSEPH'S
    23             UNIVERSITY CAMPION STUDENT CENTER           5,950,000
    24         (DDD)  ACQUISITION, INFRASTRUCTURE
    25             IMPROVEMENTS, CONSTRUCTION AND RELATED
    26             COSTS FOR RENOVATIONS TO SAINT JOSEPH'S
    27             UNIVERSITY FACILITIES AT 5920 CITY
    28             AVENUE                                      2,500,000
    29         (EEE)  RENOVATIONS, CONSTRUCTION AND
    30             INFRASTRUCTURE REPAIR AND
    20070H1589B2829                 - 166 -    

     1             REVITALIZATION OF WEST MARKET STREET       20,000,000
     2         (FFF)  RENOVATIONS AND CONSTRUCTION OF THE
     3             HADDINGTON/SHEPARD RECREATION COMPLEX       2,000,000
     4         (GGG)  RENOVATIONS AND CONSTRUCTION OF THE
     5             PAPA COMMUNITY RECREATION CENTER            5,000,000
     6         (HHH)  DEMOLITION, RENOVATION AND
     7             CONSTRUCTION OF MANTUA HALL                 7,000,000
     8         (III)  RENOVATION AND CONSTRUCTION FOR THE
     9             MILL CREEK REVITALIZATION PROJECT, TO
    10             INCLUDE HOUSING, RECREATION AND
    11             ECONOMIC DEVELOPMENT                       10,000,000
    12         (JJJ)  DEMOLITION, RENOVATION AND
    13             CONSTRUCTION OF THE CROYDON APARTMENT
    14             COMPLEX FOR HOUSING, COMMERCIAL
    15             DEVELOPMENT, RECREATION AND EDUCATION
    16             FACILITIES                                  3,000,000
    17         (KKK)  RENOVATION AND CONSTRUCTION OF A
    18             COMMUNITY CENTER AS PART OF THE BEAVER
    19             WYNNFIELD ALTERNATIVE PROGRAM               3,000,000
    20         (LLL)  RENOVATION AND CONSTRUCTION OF THE
    21             CHALMERS ATHLETIC AND RECREATION
    22             COMPLEX                                    10,000,000
    23         (MMM)  RENOVATION OF THE LINCOLN/MARKET
    24             SQUARE EDUCATION CENTER AND OFFICE
    25             COMPLEX                                    10,000,000
    26         (NNN)  CONSTRUCTION OF ENTERPRISE HEIGHTS
    27             FOR A RETAIL, COMMUNITY SPACE AND
    28             HOUSING COMPLEX                             2,500,000
    29         (OOO)  RENOVATION OF MANTUA HAVERFORD
    30             COMMUNITY CENTER                            2,000,000
    20070H1589B2829                 - 167 -    

     1         (PPP)  RENOVATIONS TO THE CENTER FOR HUMAN
     2             ADVANCEMENT FOR EDUCATION CENTER,
     3             OFFICE COMPLEX AND COMMUNITY SPACE          5,000,000
     4         (QQQ)  RENOVATION AND CONSTRUCTION OF THE
     5             FAMILY REVITALIZATION COMPLEX             150,000,000
     6         (RRR)  RENOVATION AND EXPANSION OF THE
     7             KEYSTONE HOSPICE                           10,000,000
     8         (SSS)  DEMOLITION, RENOVATION AND
     9             CONSTRUCTION OF FREEDOM PARK COMPLEX       10,000,000
    10         (TTT)  RENOVATIONS, INFRASTRUCTURE
    11             IMPROVEMENTS AND CONSTRUCTION OF THE
    12             HISTORICAL SOCIETY OF PENNSYLVANIA
    13             BUILDING                                    2,500,000
    14         (UUU)  RENOVATION AND CONSTRUCTION OF
    15             ANIMAL SHELTER                              2,000,000
    16         (VVV)  RENOVATION AND CONSTRUCTION OF A
    17             CHILDREN AND FAMILY HEALTH CARE COMPLEX
    18             IN WEST PHILADELPHIA                        3,000,000
    19         (WWW)  RENOVATION AND CONSTRUCTION OF THE
    20             WEST PHILADELPHIA TECHNOLOGY TRAINING
    21             CENTER                                      2,500,000
    22         (XXX)  ACQUISITION, DEMOLITION, RENOVATION
    23             AND CONSTRUCTION FOR THOMAS JEFFERSON
    24             UNIVERSITY SPECIAL DIAGNOSTIC AND
    25             TREATMENT MEDICAL AND SURGICAL
    26             FACILITIES                                 50,000,000
    27         (YYY)  DEMOLITION AND ABATEMENT COSTS FOR
    28             THE PASCHALL HOMES REDEVELOPMENT
    29             PROJECT                                     8,600,000
    30         (ZZZ)  ACQUISITION, CONSTRUCTION,
    20070H1589B2829                 - 168 -    

     1             INFRASTRUCTURE, REDEVELOPMENT AND OTHER
     2             COSTS RELATED TO THE PLAZA AT
     3             ENTERPRISE HEIGHTS                          7,000,000
     4         (AAAA)  ACQUISITION, CONSTRUCTION,
     5             INFRASTRUCTURE, ABATEMENT OF HAZARDOUS
     6             MATERIALS AND OTHER COSTS RELATED TO
     7             THE NORTHWEST PHILLY ARTS AND CULTURE
     8             CENTER                                     10,000,000
     9         (BBBB)  CONSTRUCTION, INFRASTRUCTURE AND
    10             OTHER COSTS RELATED TO THE STEVENSON
    11             LANE RESIDENCE PROJECT                      2,000,000
    12         (CCCC)  CONSTRUCTION, INFRASTRUCTURE AND
    13             OTHER COSTS RELATED TO THE HOLY FAMILY
    14             UNIVERSITY SCHOOL OF BUSINESS
    15             ADMINISTRATION                              2,000,000
    16         (DDDD)  CONSTRUCTION AND OTHER COSTS
    17             RELATED TO THE PHILADELPHIA UNIVERSITY
    18             PEDESTRIAN BRIDGE/TRAFFIC SAFETY
    19             PROJECT                                     2,000,000
    20         (EEEE)  CONSTRUCTION AND OTHER COSTS
    21             RELATED TO THE NORTHEAST FAMILY YMCA        3,500,000
    22         (FFFF)  CONSTRUCTION, INFRASTRUCTURE,
    23             REDEVELOPMENT, ABATEMENT OF HAZARDOUS
    24             MATERIALS AND OTHER COSTS RELATED TO
    25             THE INDEPENDENCE CHARTER SCHOOL             8,600,000
    26         (GGGG)  CONSTRUCTION, REDEVELOPMENT AND
    27             OTHER COSTS RELATED TO THE ITALIAN
    28             AMERICAN CULTURAL CENTER                    2,000,000
    29         (HHHH)  CONSTRUCTION RELATED TO WEST
    30             PARKSIDE BUILDING ECONOMIC AND
    20070H1589B2829                 - 169 -    

     1             COMMERCIAL DEVELOPMENT PROJECT                500,000
     2         (IIII)  INFRASTRUCTURE IMPROVEMENTS AND
     3             CONSTRUCTION FOR THE NAZARETH HOSPITAL
     4             ONCOLOGY PROJECT                            1,000,000
     5         (JJJJ)  HAHNEMANN HOSPITAL, INFRASTRUCTURE
     6             IMPROVEMENTS, CONSTRUCTION AND OTHER
     7             RELATED COSTS FOR THE EXPANSION OF THE
     8             INTENSIVE CARE UNIT                         4,500,000
     9         (KKKK)  HAHNEMANN HOSPITAL, INFRASTRUCTURE
    10             IMPROVEMENTS, CONSTRUCTION AND OTHER
    11             RELATED COSTS FOR MODERNIZATION AND
    12             EXPANSION OF THE OPERATING ROOMS AND
    13             RECOVERY ROOM                              10,000,000
    14         (LLLL)  DEMOLITION, INFRASTRUCTURE
    15             IMPROVEMENTS, CONSTRUCTION AND OTHER
    16             COSTS RELATED TO THE CONVOCATION AND
    17             BASKETBALL ARENA PROJECT AT DREXEL
    18             UNIVERSITY                                 15,000,000
    19         (MMMM)  INFRASTRUCTURE IMPROVEMENTS AND
    20             DEVELOPMENT RELATED TO THE UNIVERSITY
    21             CITY GATEWAY PROJECT                       30,000,000
    22         (NNNN)  RENOVATION AND CONSTRUCTION OF THE
    23             HADDINGTON HEALTH CENTER                    1,000,000
    24         (OOOO)  INFRASTRUCTURE IMPROVEMENTS FOR THE
    25             FORMER LIDDONFIELD HOMES AT TORRESDALE
    26             AVENUE AND JACKSON PLACE                   10,000,000
    27         (PPPP)  CONSTRUCTION AND OTHER RELATED
    28             COSTS FOR THE OCTAVIUS V. CATTO
    29             MEMORIAL PROJECT                            1,000,000
    30  (52)  Pike County
    20070H1589B2829                 - 170 -    

     1     (i)  County projects (Reserved)                                <--
     2     (I)  COUNTY PROJECTS                                           <--
     3         (A)  ACQUISITION, INFRASTRUCTURE,
     4             REHABILITATION, CONSTRUCTION AND OTHER
     5             RELATED COSTS FOR IMPROVEMENTS TO THE
     6             MT. LAUREL CENTER FOR PERFORMING ARTS         600,000
     7         (B)  ACQUISITION, SITE DEVELOPMENT,
     8             INFRASTRUCTURE AND OTHER RELATED COSTS
     9             FOR THE CONSTRUCTION OF AN EXPANSION OF
    10             THE PIKE COUNTY ADMINISTRATIVE
    11             FACILITY                                    5,000,000
    12         (C)  ACQUISITION, INFRASTRUCTURE, SITE
    13             DEVELOPMENT, CONSTRUCTION AND OTHER
    14             RELATED COSTS FOR THE DEVELOPMENT OF AN
    15             EMERGENCY TRAINING CENTER                   5,000,000
    16         (D)  ACQUISITION, SITE DEVELOPMENT,
    17             INFRASTRUCTURE AND CONSTRUCTION OF A
    18             JUVENILE DETENTION CENTER AND YOUTH
    19             SHELTER                                     5,000,000
    20     (ii)  Lehman Township
    21         (A)  Redevelopment and other costs related
    22             to the completion and capital
    23             improvements to Mountain Laurel Center
    24             for the Performing Arts                       600,000
    25  (53)  Potter County (Reserved)                                    <--
    26     (III)  MILFORD BOROUGH                                         <--
    27         (A)  INFRASTRUCTURE AND CONSTRUCTION OF A
    28             PUBLIC LIBRARY                              1,000,000
    29     (IV)  PIKE COUNTY INDUSTRIAL DEVELOPMENT
    30         CORPORATION
    20070H1589B2829                 - 171 -    

     1         (A)  ACQUISITION, INFRASTRUCTURE, SITE
     2             DEVELOPMENT, CONSTRUCTION AND OTHER
     3             RELATED COSTS FOR THE DEVELOPMENT OF
     4             THE PIKE COUNTY BUSINESS PARK               2,500,000
     5  (53)  POTTER COUNTY
     6     (I)  COUNTY PROJECTS (RESERVED)
     7     (II)  COUDERSPORT BOROUGH
     8         (A)  CONSTRUCTION, RENOVATION AND
     9             REHABILITATION NECESSARY FOR A
    10             COMPREHENSIVE UPGRADE OF THE FACILITY
    11             AND PHYSICAL PLANT, INCLUDING EXPANSION
    12             OF THE EMERGENCY DEPARTMENT,
    13             INFRASTRUCTURE IMPROVEMENTS AND
    14             PHYSICAL REDESIGN OF THE LONG-TERM CARE
    15             FACILITY, FIRE SAFETY PROTECTION
    16             IMPROVEMENTS AND UPGRADES AND
    17             RENOVATION OF THE DIETARY SERVICE
    18             DEPARTMENT AT CHARLES COLE MEMORIAL
    19             HOSPITAL                                    2,000,000
    20     (III)  POTTER COUNTY REDEVELOPMENT AUTHORITY
    21         (A)  ACQUISITION, INFRASTRUCTURE,
    22             CONSTRUCTION AND OTHER RELATED COSTS
    23             FOR THE REVITALIZATION AND
    24             REHABILITATION OF DOWNTOWN GALETON,
    25             INCLUDING FACADE IMPROVEMENTS, SITE
    26             DEVELOPMENT AND FACILITY CONSTRUCTION       1,000,000
    27         (B)  INFRASTRUCTURE, CONSTRUCTION AND OTHER
    28             RELATED COSTS FOR THE DEVELOPMENT OF AN
    29             INDUSTRIAL PARK IN THE BOROUGH OF
    30             COUDERSPORT, INCLUDING SITE
    20070H1589B2829                 - 172 -    

     1             PREPARATION, CONSTRUCTION AND ON-SITE
     2             INFRASTRUCTURE DEVELOPMENT                  1,000,000
     3         (C)  ACQUISITION, INFRASTRUCTURE,
     4             CONSTRUCTION AND OTHER RELATED COSTS
     5             FOR THE DEVELOPMENT OF A HELICOPTER
     6             LANDING AND MAINTENANCE FACILITY FOR
     7             ECONOMIC DEVELOPMENT PURPOSES RELATED
     8             TO ATTRACTING CORPORATE TENANTS TO
     9             POTTER COUNTY                               1,000,000
    10  (54)  Schuylkill County
    11     (i)  County projects
    12         (A)  Acquisition, infrastructure and other
    13             costs related to the construction of a
    14             regional industrial park                    1,000,000
    15         (B)  LAND ACQUISITION, INFRASTRUCTURE                      <--
    16             IMPROVEMENTS AND CONSTRUCTION NECESSARY
    17             TO MAINTAIN THE COMPETITIVE POSITION OF
    18             AN EXISTING BUSINESS ENTITY OR FOR THE
    19             DEVELOPMENT OF BUSINESS-READY SITES FOR
    20             POTENTIAL BUSINESS TENANTS                 10,000,000
    21         (C)  ACQUISITION, CONSTRUCTION,
    22             INFRASTRUCTURE AND OTHER RELATED COSTS
    23             FOR THE SCHUYLKILL WOMEN IN CRISIS
    24             FACILITY                                    1,000,000
    25         (D)  ACQUISITION, INFRASTRUCTURE
    26             IMPROVEMENTS AND CONSTRUCTION FOR THE
    27             AURORA INDUSTRIAL BUILDING PROJECT            800,000
    28     (ii)  Coaldale Borough
    29         (A)  Construction, infrastructure and other
    30             costs related to the renovation of the
    20070H1589B2829                 - 173 -    

     1             Coaldale Complex                            1,000,000
     2     (iii)  Orwigsburg Borough
     3         (A)  Construction, infrastructure and other
     4             costs related to the renovation of the
     5             Orwigsburg Memorial Hall                      500,000
     6         (B)  Construction, infrastructure and other
     7             costs related to the renovation of the
     8             Orwigsburg Public Library                     500,000
     9         (C)  Construction, infrastructure and other
    10             costs related to the renovation of
    11             Orwigsburg Borough Hall                       500,000
    12     (iv)  Tamaqua Borough
    13         (A)  Reconstruction of Wabash Creek storm
    14             water tunnel and diversion system           5,000,000
    15         (B)  Repairs to the two Owl Creek dams,
    16             including breast repairs and spillway
    17             construction                                3,000,000
    18     (v)  West Penn Township
    19         (A)  Acquisition, infrastructure and other
    20             costs related to the construction of a
    21             regional industrial park                    1,000,000
    22  (55)  Snyder County
    23     (i)  County projects (Reserved)
    24     (ii)  Selinsgrove Borough
    25         (A)  Construction of Susquehanna University
    26             Science facility                           15,000,000
    27         (B)  Renovation of Susquehanna University
    28             Science Hall, including related
    29             infrastructure                              6,000,000
    30  (56)  Somerset County
    20070H1589B2829                 - 174 -    

     1     (i)  County projects (Reserved)                                <--
     2     (I)  COUNTY PROJECTS (RESERVED)                                <--
     3     (II)  FAIRHOPE TOWNSHIP
     4         (A)  SITE DEVELOPMENT, CONSTRUCTION,
     5             REHABILITATION AND INFRASTRUCTURE
     6             IMPROVEMENTS TO THE INTERNATIONAL
     7             CONSERVATION CENTER                         3,000,000
     8     (ii) (III)  Jefferson Township                                 <--
     9         (A)  Site development, construction and
    10             infrastructure improvements to property
    11             located along Route 31                     10,000,000
    12     (iii) (IV)  Somerset Township                                  <--
    13         (A)  Redevelopment, construction and
    14             related infrastructure costs for Laurel
    15             Highlands Business Park                     5,000,000
    16         (B)  RENOVATIONS TO SOMERSET HOSPITAL,                     <--
    17             INCLUDING UPGRADE OF PHARMACY
    18             FACILITIES                                  1,500,000
    19         (C)  ACQUISITION, RENOVATION, DEMOLITION
    20             AND CONSTRUCTION RELATED TO THE
    21             DEVELOPMENT OF A DOWNTOWN HEALTH CARE
    22             CAMPUS ASSOCIATED WITH SOMERSET
    23             HOSPITAL                                    1,500,000
    24  (57)  Sullivan County (Reserved)
    25  (58)  Susquehanna County (Reserved)
    26  (59)  Tioga County
    27     (i)  County projects (Reserved)                                <--
    28     (I)  COUNTY PROJECTS                                           <--
    29         (A)  DEVELOPMENT OF THE MARSH CREEK
    30             GREENWAY, EXTENDING FROM THE BOROUGH OF
    20070H1589B2829                 - 175 -    

     1             WELLSBORO TO THE PINE CREEK TRAIL AT
     2             WELLSBORO JUNCTION                          2,350,000
     3         (B)  CONSTRUCTION OF A NEW 911/EMERGENCY
     4             OPERATIONS CENTER/TRAINING FACILITY         3,500,000
     5         (C)  DEVELOPMENT OF THE MILL COVE
     6             ENVIRONMENTAL EDUCATION CENTER,
     7             INCLUDING INFRASTRUCTURE IMPROVEMENTS
     8             AND CONSTRUCTION OF SUPPORT FACILITIES      1,500,000
     9         (D)  ACQUISITION, INFRASTRUCTURE,
    10             CONSTRUCTION AND OTHER RELATED COSTS
    11             FOR THE NATURE QUEST GEOTOURISM LODGE
    12             AND BUSINESS FACILITIES DEVELOPMENT
    13             PROJECT, INCLUDING THE DEVELOPMENT OF A
    14             200-ROOM LODGE AND OPERATIONAL
    15             FACILITIES LOCATED IN ANSONIA              12,500,000
    16     (II)  TIOGA COUNTY DEVELOPMENT CORPORATION
    17         (A)  DEVELOPMENT OF A GREEN DESIGN (LEED)
    18             INDUSTRIAL PARK ALONG US 15 (FUTURE I-
    19             99), INCLUDING INTERCHANGE ACCESSES TO
    20             US 15 AS PART OF THE INTERSTATE 99
    21             BUSINESS PARK, PHASE II                     7,000,000
    22         (B)  RENOVATION AND REHABILITATION OF THE
    23             TCDC HISTORIC BUILDING LOCATED IN THE
    24             BOROUGH OF WELLSBORO, INCLUDING
    25             HAZARDOUS MATERIAL ABATEMENT                  750,000
    26     (III)  LIBERTY BOROUGH
    27         (A)  REPLACEMENT OF A STONE CULVERT THAT
    28             PARALLELS SR 2007 THROUGH LIBERTY
    29             BOROUGH AS PART OF THE WILLIAMSON TRAIL
    30             PROJECT                                       500,000
    20070H1589B2829                 - 176 -    

     1     (ii) (IV)  Shippen Township                                    <--
     2         (A)  Expansion and construction of Nature
     3             Quest Geotourism Lodge, including
     4             acquisition and infrastructure             12,500,000
     5     (iii) (V)  Wellsboro Borough                                   <--
     6         (A)  Acquisition, construction and
     7             infrastructure improvements of a
     8             Community Performing Arts Center            7,500,000
     9         (B)  CONSTRUCTION OF THE DEANE CENTER FOR                  <--
    10             THE PERFORMING ARTS                         7,500,000
    11  (60)  Union County
    12     (i)  County projects (Reserved)                                <--
    13     (I)  COUNTY PROJECTS                                           <--
    14         (A)  DEVELOPMENT OF THE BUCKNELL UNIVERSITY
    15             BULL RUN GATEWAY NEIGHBORHOOD
    16             DEVELOPMENT PROJECT, INCLUDING AN ART
    17             CENTER, PARKING FACILITIES, BOOKSTORE,
    18             INN AND BUSINESS CENTER                    20,000,000
    19     (ii)  Kelly Township
    20         (A)  Expansion and renovation of
    21             Evangelical Community Hospital,
    22             including related infrastructure           11,000,000
    23  (61)  Venango County
    24     (i)  County projects (Reserved)                                <--
    25     (I)  COUNTY PROJECTS                                           <--
    26         (A)  RENOVATIONS AND REHABILITATION TO THE
    27             VENANGO COUNTY COURTHOUSE                     500,000
    28         (B)  INFRASTRUCTURE AND OTHER RELATED COSTS
    29             FOR THE DEVELOPMENT OF THE FRENCHCREEK
    30             INDUSTRIAL PARK, A MULTITENANT LIGHT
    20070H1589B2829                 - 177 -    

     1             INDUSTRIAL PARK                               700,000
     2         (C)  SITE DEVELOPMENT, INFRASTRUCTURE
     3             IMPROVEMENTS AND CONSTRUCTION OF A
     4             BUILDING ON A DESIGNATED FOREIGN TRADE
     5             ZONE ADJACENT TO THE VENANGO REGIONAL
     6             AIRPORT                                     1,000,000
     7         (D)  ACQUISITION AND CONSTRUCTION OF A BIKE
     8             TRAIL FROM MCCLINTOCK WELL NO. 1 FROM
     9             CORNPLANTER TOWNSHIP TO THE CITY OF OIL
    10             CITY                                        1,200,000
    11     (ii)  Emlenton Borough
    12         (A)  Acquisition, site development and
    13             construction to support revitalization
    14             in Emlenton Borough                           500,000
    15  (62)  Warren County (Reserved)                                    <--
    16     (III)  CITY OF OIL CITY                                        <--
    17         (A)  RENOVATIONS, CONSTRUCTION AND
    18             EXPANSION OF THE OIL CITY YMCA              1,500,000
    19         (B)  RENOVATIONS, NEW CONSTRUCTION AND
    20             REHABILITATION OF THE CORNPLANTER
    21             SQUARE BUILDING AND THE BRODY BLOCK         7,500,000
    22  (62)  WARREN COUNTY
    23     (I)  COUNTY PROJECTS (RESERVED)
    24     (II)  PINE GROVE TOWNSHIP
    25         (A)  CONSTRUCTION OF 12 INDEPENDENT LIVING
    26             UNITS, INCLUDING SITE WORK AND
    27             INFRASTRUCTURE IMPROVEMENTS AT WARREN
    28             GENERAL HOSPITAL                            1,025,000
    29     (III)  CITY OF WARREN
    30         (A)  ACQUISITION OF IMAGING EQUIPMENT,
    20070H1589B2829                 - 178 -    

     1             ELECTRONIC MEDICAL RECORD SYSTEMS
     2             SOFTWARE AND AN INFANT ABDUCTION
     3             SECURITY SYSTEM AT WARREN GENERAL
     4             HOSPITAL                                      575,000
     5         (B)  RENOVATION AND EXPANSION OF EXISTING
     6             FACILITY FOR MEDICAL OFFICES AT WARREN
     7             GENERAL HOSPITAL                            1,350,000
     8         (C)  RENOVATION AND EXPANSION OF THE
     9             CRITICAL CARE INPATIENT UNIT AT WARREN
    10             GENERAL HOSPITAL                            1,250,000
    11         (D)  INFRASTRUCTURE, CONSTRUCTION AND OTHER
    12             RELATED COSTS FOR THE WARREN DOWNTOWN
    13             ECONOMIC DEVELOPMENT PROJECT, INCLUDING
    14             COMPREHENSIVE AND INTERRELATED PUBLIC
    15             INFRASTRUCTURE IMPROVEMENTS AND
    16             ENHANCEMENTS TO STREET CORRIDORS IN THE
    17             DOWNTOWN CENTRAL BUSINESS DISTRICT          2,500,000
    18         (E)  ACQUISITION, INFRASTRUCTURE,
    19             REDEVELOPMENT AND OTHER RELATED COSTS
    20             FOR THE CONSTRUCTION OF A NEW HOTEL AND
    21             CONVENTION CENTER ON WARREN'S
    22             RIVERFRONT AS PART OF THE AMBITIOUS
    23             IMPACT WARREN REDEVELOPMENT INITIATIVE      3,000,000
    24  (63)  Washington County
    25     (i)  County projects (Reserved)
    26     (ii)  Allenport Borough
    27         (A)  Acquisition, construction,
    28             infrastructure and other related costs
    29             to restore the Barge Shipping facility      1,250,000
    30     (II.1)  BENTLEYVILLE BOROUGH                                   <--
    20070H1589B2829                 - 179 -    

     1         (A)  ACQUISITION, INFRASTRUCTURE
     2             IMPROVEMENTS AND RECONSTRUCTION OF
     3             HISTORIC BUILDINGS                            500,000
     4         (B)  CONSTRUCTION AND EXPANSION OF THE
     5             BENTWORTH SENIOR CENTER                     1,000,000
     6     (iii)  California Borough
     7         (A)  Acquisition, construction,
     8             infrastructure and other related costs
     9             for the California Technology Park film
    10             industry project                            1,250,000
    11     (iv)  Canonsburg Borough
    12         (A)  Construction, infrastructure and other
    13             related costs for the Town Park
    14             project                                       940,000
    15         (B)  INFRASTRUCTURE IMPROVEMENTS AND                       <--
    16             CONSTRUCTION, INCLUDING ROADWAY
    17             CONNECTION FOR SOUTHPOINT II PROJECT        2,000,000
    18     (IV.1)  CANTON TOWNSHIP
    19         (A)  ACQUISITION, INFRASTRUCTURE
    20             IMPROVEMENTS, RENOVATIONS, CONSTRUCTION
    21             AND OTHER RELATED COSTS FOR JESSOP
    22             PLACE                                       1,000,000
    23     (v)  Carroll Township
    24         (A)  Construction and other related costs
    25             for the Monongahela Valley Hospital
    26             upgrade project                             3,000,000
    27     (vi)  Cecil Township
    28         (A)  Construction and development of
    29             recreation complex near Muse School
    30             property                                      500,000
    20070H1589B2829                 - 180 -    

     1         (B)  INFRASTRUCTURE IMPROVEMENTS AND                       <--
     2             CONSTRUCTION FOR SOUTHPOINT II PROJECT      4,000,000
     3     (vii)  Chartiers Township
     4         (A)  Construction and other related costs
     5             for the Chartiers Township community
     6             center                                        500,000
     7         (B)  Land acquisition and development of
     8             Chartiers Township recreation complex       5,000,000
     9         (C)  INFRASTRUCTURE IMPROVEMENTS AND                       <--
    10             CONSTRUCTION OF PENNSYLVANIA TROLLEY
    11             MUSEUM VISITOR'S CENTER                     8,000,000
    12     (viii)  City of Washington
    13         (A)  Construction and other related costs
    14             for the Crossroads Amphitheater             1,000,000
    15         (B)  Construction and other related costs
    16             for the redevelopment of Main and
    17             Maiden Streets                             15,000,000
    18         (C)  Improvements to the Washington Park
    19             recreation facility                         1,250,000
    20         (D)  Construction and other related costs
    21             for the Main Street Works Project          12,500,000
    22         (E)  Acquisition of land and construction
    23             of a police/fire safety building
    24             complex                                     3,000,000
    25         (F)  CONSTRUCTION OF WASHINGTON AND                        <--
    26             JEFFERSON COLLEGE MULTIUSE ECONOMIC
    27             DEVELOPMENT FACILITY                        4,000,000
    28         (G)  CONSTRUCTION OF THE WASHINGTON
    29             HOSPITAL EXPANSION PROJECT                 10,000,000
    30         (H)  ACQUISITION, DEMOLITION AND
    20070H1589B2829                 - 181 -    

     1             CONSTRUCTION FOR THE WHEELING STREET
     2             REVITALIZATION PROJECT                      4,000,000
     3         (I)  INFRASTRUCTURE IMPROVEMENTS AND
     4             CONSTRUCTION OF THE LEYMONE CENTER
     5             IMPROVEMENT PROJECT                         2,000,000
     6     (ix)  Cross Creek Township
     7         (A)  Construction and other related costs
     8             for the Cedar Grove
     9             community/recreation project                  500,000
    10     (x)  Fallowfield Township
    11         (A)  Construction, infrastructure,
    12             acquisition and other costs related to
    13             the Shell Building and supporting
    14             infrastructure in Alta Vista Business
    15             Park                                        1,250,000
    16     (X.1)  JEFFERSON TOWNSHIP                                      <--
    17         (A)  INFRASTRUCTURE IMPROVEMENTS AND
    18             CONSTRUCTION FOR THE MEADOWCROFT
    19             ROCKSHELTER AND MUSEUM OF RURAL LIFE        2,000,000
    20     (xi)  Mount Pleasant Township
    21         (A)  Construction and other related costs
    22             for the Hickory Main Street
    23             revitalization                                500,000
    24     (xii)  North Franklin Township
    25         (A)  Construction and other related costs
    26             for a new municipal office/community
    27             building                                    3,000,000
    28     (xiii)  North Strabane Township
    29         (A)  Construction and other related costs
    30             for the North Strabane Township
    20070H1589B2829                 - 182 -    

     1             community/recreation center                 1,000,000
     2         (B)  ACQUISITION, EXPANSION, RENOVATION,                   <--
     3             CONSTRUCTION AND INFRASTRUCTURE
     4             IMPROVEMENTS FOR THE CANONSBURG GENERAL
     5             HOSPITAL CAMPUS                            10,000,000
     6     (xiv)  Roscoe Borough
     7         (A)  Construction, infrastructure and other
     8             related costs for community park
     9             improvements                                  500,000
    10     (XIV.1)  SOUTH FRANKLIN TOWNSHIP                               <--
    11         (A)  ACQUISITION, INFRASTRUCTURE
    12             IMPROVEMENTS AND CONSTRUCTION FOR
    13             SKYPOINTE INDUSTRIAL AND BUSINESS PARK      5,000,000
    14         (B)  CONSTRUCTION AND INFRASTRUCTURE
    15             IMPROVEMENTS FOR THE MIXED-USE OFFICE
    16             AND INDUSTRIAL, RESIDENTIAL AND
    17             COMMERCIAL DEVELOPMENTS ALONG THE ROUTE
    18             18 SOUTH CORRIDOR                           5,000,000
    19     (xv)  South Strabane Township
    20         (A)  Construction, infrastructure and other
    21             related costs for the Zediker Station
    22             Business Park                               5,000,000
    23         (B)  Construction and other related costs
    24             for a police and road department
    25             facility                                      875,000
    26         (C)  INFRASTRUCTURE IMPROVEMENTS AND                       <--
    27             CONSTRUCTION FOR THE MEADOWLANDS
    28             INTERCHANGE REHABILITATION PROJECT          5,000,000
    29     (xvi)  Union Township
    30         (A)  Infrastructure, redevelopment,
    20070H1589B2829                 - 183 -    

     1             abatement of hazardous materials and
     2             other costs related to the Phoenix
     3             Business Park                               1,000,000
     4         (B)  Phoenix Business Park, environmental                  <--
     5             remediation, site preparation and
     6             infrastructure for development of a 58-
     7             acre business park                          1,000,000
     8     (xvii)  Washington Borough
     9         (A)  Construction, infrastructure,
    10             acquisition and other related costs to
    11             build a Washington Community Health
    12             Center                                      1,500,000
    13  (64)  Wayne County
    14     (i)  County Projects (Reserved)                                <--
    15     (I)  COUNTY PROJECTS                                           <--
    16         (A)  RENOVATIONS OF ATHLETIC FIELDS AND
    17             SURROUNDING INFRASTRUCTURE AT THE
    18             WESTERN WAYNE SCHOOL DISTRICT                 500,000
    19         (B)  INFRASTRUCTURE, TECHNOLOGICAL
    20             EQUIPMENT UPGRADES AND CONSTRUCTION OF
    21             AN EMERGENCY MANAGEMENT AND 911 CENTER      2,250,000
    22     (I.1)  HAWLEY BOROUGH
    23         (A)  ACQUISITION, INFRASTRUCTURE AND OTHER
    24             COSTS RELATED TO THE CONSTRUCTION OF A
    25             MEDICAL CAMPUS                              1,800,000
    26     (ii)  Palmyra Township
    27         (A)  Construction and infrastructure
    28             related to the redevelopment of the
    29             Lake Wallenpaupack Visitors Center          1,000,000
    30  (65)  Westmoreland County
    20070H1589B2829                 - 184 -    

     1     (i)  County projects (Reserved)                                <--
     2     (I)  COUNTY PROJECTS                                           <--
     3         (A)  DESIGN AND CONSTRUCTION OF A 22,000-
     4             SQUARE-FOOT HISTORY AND EDUCATION
     5             CENTER AT THE HISTORIC HANNA'S TOWN         3,000,000
     6         (B)  WESTMORELAND CULTURAL TRUST
     7             (I)  ACQUISITION AND REHABILITATION OF
     8                 A STRUCTURE IN DOWNTOWN LATROBE FOR
     9                 THE PURPOSES OF COMMERCIAL REUSE
    10                 AND DEVELOPMENT OF A DOWNTOWN
    11                 DESTINATION SPOT AS PART OF THE
    12                 LATROBE TRAIN STATION PROJECT           1,000,000
    13             (II)  RENOVATIONS AND REHABILITATION TO
    14                 THE HISTORICAL UNION TRUST
    15                 BUILDING                                1,000,000
    16             (III)  ACQUISITION AND REHABILITATION
    17                 OF A STRUCTURE IN THE DOWNTOWN AREA
    18                 OF WEST NEWTON FOR THE WEST NEWTON
    19                 CULTURAL CENTER                         1,000,000
    20             (IV)  ACQUISITION, REHABILITATION AND
    21                 RENOVATIONS TO THE HISTORICAL
    22                 GREENSBURG CARGO TRAIN STATION FOR
    23                 THE PURPOSE OF PLACING THE STATION
    24                 BACK INTO PRODUCTIVE COMMERCIAL
    25                 USE                                     1,000,000
    26             (V)  ACQUISITION, INFRASTRUCTURE,
    27                 CONSTRUCTION AND OTHER RELATED
    28                 COSTS FOR THE CONSTRUCTION OF A
    29                 175-UNIT PARKING GARAGE AS PART OF
    30                 THE GREENSBURG PARKING GARAGE
    20070H1589B2829                 - 185 -    

     1                 PROJECT                                 3,000,000
     2     (ii)  City of Greensburg
     3         (A)  Construction and other costs related
     4             to construction of an addition to the                  <--
     5             Seton Hill University Lynch Science
     6             Hall                                       15,000,000
     7             TO CONSTRUCTION OF A MEDICAL SCHOOL AT                 <--
     8             SETON HILL UNIVERSITY                      15,000,000
     9         (B)  Acquisition, construction,
    10             infrastructure and other related costs
    11             for Greensburg Downtown revitalization      5,000,000
    12         (C)  Acquisition, construction,
    13             infrastructure and other related costs
    14             for the Westmoreland County Community
    15             College Sports and Recreation Facility      6,000,000
    16         (D)  RENOVATION OF THE SCIENCE LABORATORIES                <--
    17             LOCATED ON THE SETON HILL UNIVERSITY
    18             CAMPUS                                      1,000,000
    19         (E)  RENOVATIONS AND EXPANSION OF THE
    20             STUDENT CENTER FACILITIES LOCATED ON
    21             THE SETON HILL UNIVERSITY CAMPUS            1,000,000
    22         (F)  ACQUISITION, INFRASTRUCTURE, DESIGN,
    23             REDEVELOPMENT AND CONSTRUCTION-RELATED
    24             COSTS FOR THE EXPANSION OF THE
    25             WESTMORELAND MUSEUM OF AMERICAN ART         1,250,000
    26         (G)  ACQUISITION, INFRASTRUCTURE, DESIGN,
    27             REDEVELOPMENT AND CONSTRUCTION-RELATED
    28             COSTS FOR THE TOTAL REHABILITATION OF A
    29             BUILDING IN THE DOWNTOWN DISTRICT OF
    30             GREENSBURG                                  2,500,000
    20070H1589B2829                 - 186 -    

     1         (H)  ACQUISITION, INFRASTRUCTURE, DESIGN,
     2             REDEVELOPMENT AND CONSTRUCTION-RELATED
     3             COSTS FOR CAPITAL IMPROVEMENTS AND
     4             REDEVELOPMENT OF CULTURAL, HISTORIC AND
     5             DOWNTOWN DISTRICTS OF THE CITY OF
     6             GREENSBURG                                  2,500,000
     7     (ii.1)  Hempfield Township
     8         (A)  Acquisition, construction,
     9             infrastructure and other related costs
    10             to expand Green Forge                         750,000
    11     (iii)  Latrobe Borough
    12         (A)  Renovation and expansion of St.
    13             Vincent College facilities                 15,000,000
    14     (III.1)  CITY OF NEW KENSINGTON                                <--
    15         (A)  RENOVATION, REHABILITATION AND
    16             CONSTRUCTION OF THE DOWNTOWN CENTRAL
    17             BUSINESS DISTRICT                           2,000,000
    18         (B)  ACQUISITION, RENOVATIONS, CONSTRUCTION
    19             AND INFRASTRUCTURE IMPROVEMENTS FOR
    20             RIVER LINE PROJECT                         10,000,000
    21         (C)  ACQUISITION, RENOVATIONS, CONSTRUCTION
    22             AND INFRASTRUCTURE IMPROVEMENTS OF THE
    23             CITIZENS AMBULATORY CARE CENTER             5,000,000
    24     (iv)  New Kingston KENSINGTON                                  <--
    25         (A)  Construction and other related costs
    26             for the Alle-Kiski Education Center         2,500,000
    27         (B)  ACQUISITION, INFRASTRUCTURE,                          <--
    28             RENOVATION AND REHABILITATION OF THE
    29             CORE AREA OF THE CENTRAL BUSINESS
    30             DISTRICT FROM THE RAILROAD TRACKS TO
    20070H1589B2829                 - 187 -    

     1             INDUSTRIAL BOULEVARD AND FROM 12TH
     2             STREET TO 7TH STREET                        2,000,000
     3     (iv.1)  Unity Township
     4         (A)  Construction and other related costs                  <--
     5             for the St. Vincent College, School of
     6             Science                                    15,000,000
     7         (B)  Renovation and expansion of facilities
     8             for the Herbert W. Boyer School of
     9             Natural Science, Mathematics, and
    10             Computing, including construction          15,000,000
    11         (A)  RENOVATION AND EXPANSION OF FACILITIES                <--
    12             FOR THE HERBERT W. BOYER SCHOOL OF
    13             NATURAL SCIENCE, MATHEMATICS, AND
    14             COMPUTING, INCLUDING CONSTRUCTION, AT
    15             ST. VINCENT COLLEGE                        15,000,000
    16     (v)  Upper Burrell Township
    17         (A)  Acquisition, construction,
    18             infrastructure and other related costs
    19             of a manufacturing campus                   5,000,000
    20     (vi)  Youngwood Borough
    21         (A)  Construction, redevelopment and other
    22             costs related to the renovation of the
    23             Westmoreland County Community College
    24             Baseball Stadium                            2,500,000
    25     (VII)  WESTMORELAND COUNTY INDUSTRIAL                          <--
    26         DEVELOPMENT CORPORATION
    27         (A)  INFRASTRUCTURE, CONSTRUCTION AND OTHER
    28             RELATED COSTS FOR THE PHASE II
    29             DEVELOPMENT OF THE WESTMORELAND COUNTY
    30             AIRPARK                                     1,000,000
    20070H1589B2829                 - 188 -    

     1         (B)  INFRASTRUCTURE AND CONSTRUCTION COSTS
     2             FOR THE DEVELOPMENT OF A PARCEL OF LAND
     3             LOCATED IN THE WESTMORELAND
     4             DISTRIBUTION PARK EAST                      1,500,000
     5         (C)  INFRASTRUCTURE, CONSTRUCTION AND
     6             RENOVATION OF THE WESTMORELAND COUNTY
     7             COMMUNITY COLLEGE BASEBALL STADIUM          3,000,000
     8         (D)  ACQUISITION, INFRASTRUCTURE,
     9             CONSTRUCTION AND OTHER RELATED COSTS
    10             FOR THE DEVELOPMENT OF A 114-ACRE
    11             PARCEL OF LAND LOCATED ALONG SR 1053
    12             DIRECTLY OPPOSITE THE WESTMORELAND
    13             COUNTY INDUSTRIAL PARK I                    3,000,000
    14  (66)  Wyoming County
    15     (i)  County projects (Reserved)                                <--
    16     (I)  COUNTY PROJECTS                                           <--
    17         (A)  INFRASTRUCTURE, CONSTRUCTION AND
    18             RENOVATIONS TO THE TYLER MEMORIAL
    19             HOSPITAL                                    3,750,000
    20     (ii)  Tunkhannock Township
    21         (A)  Expansion of imaging department,
    22             emergency department and outpatient
    23             registration area at Tyler Memorial
    24             Hospital, including construction            2,500,000
    25  (67)  York County
    26     (i)  County projects (Reserved)
    27     (ii)  City of York
    28         (A)  Construction, infrastructure,
    29             abatement of hazardous materials and
    30             other costs related to the Government
    20070H1589B2829                 - 189 -    

     1             Center Renovation Project                   8,500,000
     2         (B)  Acquisition, construction,
     3             infrastructure and other related costs
     4             for downtown community college campus       7,000,000
     5         (C)  Construction, acquisition,
     6             redevelopment, abatement of hazardous
     7             materials and other costs related to
     8             the Downtown York Historic Preservation
     9             and Revitalization Project                  9,000,000
    10     (iii)  Springettsbury Township
    11         (A)  Construction, infrastructure,
    12             abatement of hazardous materials and
    13             other costs associated with the
    14             Pleasant Acres Renovation Project          11,250,000
    15     (iv)  West Manheim Township
    16         (A)  Redevelopment of South Western
    17             Elementary School for use as township
    18             administrative offices, including
    19             construction and related
    20             infrastructure                              2,000,000
    21     (V)  YORK TOWNSHIP                                             <--
    22         (A)  ACQUISITION, INFRASTRUCTURE AND
    23             RENOVATIONS FOR THE DEVELOPMENT OF
    24             PERSONAL CARE HOMES FOR THE ELDERLY         1,000,000
    25  (68)  Multiple Counties
    26     (i)  Butler and Mercer Counties
    27         (A)  Slippery Rock and Liberty Townships
    28             (I)  Acquisition and development of
    29                 Slippery Rock Business Park,
    30                 including related infrastructure        1,250,000
    20070H1589B2829                 - 190 -    

     1         (B)  COMMUNITY DEVELOPMENT CORPORATION OF                  <--
     2             BUTLER COUNTY
     3             (I)  ACQUISITION, INFRASTRUCTURE,
     4                 CONSTRUCTION AND DEVELOPMENT OF
     5                 PHASE I OF THE SLIPPERY ROCK
     6                 BUSINESS PARK II                        1,250,000
     7     (II)  ERIE, MCKEAN AND WARREN COUNTIES
     8         (A)  CITY OF CORRY REDEVELOPMENT AUTHORITY
     9             (I)  INFRASTRUCTURE, CONSTRUCTION AND
    10                 OTHER RELATED COSTS FOR THE
    11                 INSTALLATION OF SONET-BASED FIBER
    12                 OPTIC TELECOMMUNICATIONS
    13                 INFRASTRUCTURE ALONG THE ROUTE 6
    14                 CORRIDOR BETWEEN UNION CITY, ERIE
    15                 COUNTY, AND COUDERSPORT, POTTER
    16                 COUNTY                                  4,250,000
    17     (III)  LUZERNE AND SCHUYLKILL COUNTIES
    18         (A)  COUNTY PROJECTS
    19             (I)  ACQUISITION, CONSTRUCTION,
    20                 INFRASTRUCTURE AND OTHER RELATED
    21                 COSTS FOR THE DEVELOPMENT OF A
    22                 CARGO AIRPORT                         250,000,000
    23     (ii) (IV)  Snyder and Union Counties                           <--
    24         (A)  County projects
    25             (I)  Acquisition, construction,
    26                 infrastructure and other related
    27                 costs for the Greater Susquehanna
    28                 Valley YMCA                             3,000,000
    29     (V)  MONTOUR, NORTHUMBERLAND, SNYDER AND UNION                 <--
    30         COUNTIES
    20070H1589B2829                 - 191 -    

     1         (A)  GREATER SUSQUEHANNA KEYSTONE
     2             INNOVATION ZONE
     3             (I)  CONSTRUCTION, RENOVATIONS AND
     4                 OTHER RELATED COSTS FOR A NEW
     5                 INNOVATION CENTER                       3,000,000
     6     (VI)  WESTMORELAND AND ALLEGHENY COUNTIES
     7         (A)  TRAFFORD BOROUGH
     8             (I)  CONSTRUCTION, SITE PREPARATION,
     9                 RENOVATIONS, UPGRADES,
    10                 INFRASTRUCTURE IMPROVEMENTS FOR
    11                 DEVELOPMENT OF COMMERCIAL SPACE AT
    12                 THE TRAFFORD COMMERCE CENTER            4,000,000
    13     (VII)  CARBON AND MONROE COUNTIES
    14         (A)  POCONO REGION
    15             (I)  POCONO MOUNTAINS WAYFINDING
    16                 SIGNING PROGRAM                         1,000,000
    17  Section 7.  Itemization of flood control projects.
    18     Additional capital projects in the category of flood control
    19  projects to be constructed by the Department of Environmental
    20  Protection, its successors or assigns, and to be financed by the
    21  incurring of debt are hereby itemized, together with their
    22  respective estimated costs, as follows:
    23                                                           Total
    24                                                          Project
    25             Project                                    Allocation
    26  (1)  Department of Environmental Protection
    27     (i)  Blair County
    28         (A)  Construction, infrastructure and other
    29             related costs for the Mill Run
    30             Rehabilitation Project                         76,000
    20070H1589B2829                 - 192 -    

     1     (ii)  Chester County
     2         (A)  Construction, infrastructure and other
     3             related costs for the Business 30 Flood
     4             Control Project                               900,000
     5     (II.1)  CLINTON COUNTY                                         <--
     6         (A)  PINE CREEK TOWNSHIP, CONSTRUCTION,
     7             REDEVELOPMENT AND OTHER COSTS RELATED
     8             TO THE CHATHAM RUN LEVEE PROJECT            7,500,000
     9     (iii)  Columbia County
    10         (A)  Fishing Creek Flood Control Project,
    11             including gravel bar removal                1,000,000
    12     (iv)  Crawford County
    13         (A)  Conneautville Dam rehabilitation             750,000
    14     (IV.1)  INDIANA COUNTY                                         <--
    15         (A)  ACQUISITION AND CONSTRUCTION OF A
    16             FLOOD CONTROL PROJECT DESIGNED BY THE
    17             ARMY CORPS OF ENGINEERS                     2,000,000
    18     (v)  Monroe County
    19         (A)  Additional funds to refurbish Brady's
    20             Lake Dam in order to rebid the project                 <--
    21             due to delays and poor performance in
    22             concrete mix design                         3,600,000
    23             LAKE DAM                                    3,600,000  <--
    24     (vi)  Northumberland County
    25         (A)  Construction, infrastructure and other
    26             related costs for the Susquehanna River
    27             Clearing and Grubbing Project                 200,000
    28         (B)  Construction, infrastructure and other
    29             related costs for the Reagan Street
    30             Underpass Flooding Abatement Project        2,200,000
    20070H1589B2829                 - 193 -    

     1     (vii)  Schuylkill County
     2         (A)  Repairs to the two Owl Creek dams,
     3             including breast repairs and spillway
     4             construction in Borough of Tamaqua          3,000,000
     5         (B)  Reconstruction of Wabash Creek storm
     6             water tunnel and diversion system in
     7             Borough of Tamaqua                          5,000,000
     8     (viii)  Somerset County
     9         (A)  Construction, infrastructure and other
    10             related costs for the East Main Street
    11             Flood Protection Project                    5,000,000
    12     (IX)  WASHINGTON COUNTY                                        <--
    13         (A)  RECONSTRUCTION AND STABILIZATION OF
    14             CANONSBURG DAM, INCLUDING SPILLWAY AND
    15             BREAST WORKS                                8,000,000
    16  Section 8.  Itemization of Keystone Recreation, Park and
    17                 Conservation Fund projects.
    18     Projects in the category of public improvement projects to be
    19  constructed by the Department of Conservation and Natural
    20  Resources, its successors or assigns, and to be financed by
    21  current revenues of the Keystone Recreation, Park and
    22  Conservation Fund are hereby itemized, together with their
    23  respective estimated costs, as follows:
    24                                                           Total
    25                                                          Project
    26             Project                                    Allocation
    27  (1)  Department of Conservation and Natural
    28     Resources
    29     (i)  Black Moshannon State Park
    30         (A)  Rehabilitate dam spillway and boat
    20070H1589B2829                 - 194 -    

     1             launch                                        400,000
     2             (Base Project Allocation - $400,000)
     3     (ii)  Blue Knob State Park
     4         (A)  Rehabilitate park facilities                 900,000
     5             (Base Project Allocation - $900,000)
     6         (B)  Rehabilitate day use area                  1,000,000
     7             (Base Project Allocation - $1,000,000)
     8     (iii)  Caledonia State Park
     9         (A)  Replace two bridges on main park road        600,000
    10             (Base Project Allocation - $600,000)
    11         (B)  Rehabilitate park campgrounds              1,100,000
    12             (Base Project Allocation - $1,100,000)
    13     (iv)  Codorus State Park
    14         (A)  Provide paving in park                       350,000
    15             (Base Project Allocation - $350,000)
    16     (v)  Denton Hill State Park
    17         (A)  Replace main park road/parking area          400,000
    18             (Base Project Allocation - $400,000)
    19     (vi)  Forest District 19
    20         (A)  Rehabilitate Egypt Meadows Dam               750,000
    21             (Base Project Allocation - $750,000)
    22     (vii)  Forest District 20
    23         (A)  Provide new resource management
    24             center                                      4,000,000
    25             (Base Project Allocation - $4,000,000)
    26     (viii)  Little Pine State Park
    27         (A)  Renovate restroom and lower picnic
    28             area                                          300,000
    29             (Base Project Allocation - $300,000)
    30     (ix)  Moshannon State Forest
    20070H1589B2829                 - 195 -    

     1         (A)  Provide cleanup to Quehanna reactor
     2             site                                        2,400,000
     3             (Base Project Allocation - $2,400,000)
     4     (x)  Prince Gallitzin State Park
     5         (A)  Replace two restrooms at the park            300,000
     6             (Base Project Allocation - $300,000)
     7         (B)  Pave roads within the park                   350,000
     8             (Base Project Allocation - $350,000)
     9     (xi)  Reeds Gap State Park
    10         (A)  Relocate park office building              1,500,000
    11             (Base Project Allocation - $1,500,000)
    12         (B)  Replace existing swimming pool             1,000,000
    13             (Base Project Allocation - $1,000,000)
    14     (xii)  S.B. Elliott State Park
    15         (A)  Provide ADA cabins and renovate
    16             washhouse                                   1,250,000
    17             (Base Project Allocation - $1,250,000)
    18     (xiii)  Shawnee State Park
    19         (A)  Repair joints in concrete spillway           300,000
    20             (Base Project Allocation - $300,000)
    21     (xiv)  Shikellamy State Park
    22         (A)  Project (PW 4182) to provide dock
    23             rehabilitation transient and launch
    24             areas                                         663,000
    25             (Base Project Allocation - $663,000)
    26         (B)  Renovate overlook road in the park           400,000
    27             (Base Project Allocation - $400,000)
    28     (xv)  Sinnemahoning State Park
    29         (A)  Repair dam spillway                          650,000
    30             (Base Project Allocation - $650,000)
    20070H1589B2829                 - 196 -    

     1     (xvi)  Various Parks and Forest Districts,
     2         Statewide
     3         (A)  Acquire land to be incorporated within
     4             the park system according to the
     5             Commonwealth's master plan                 10,000,000
     6             (Land Allocation - $10,000,000)
     7  Section 9.  Itemization of Environmental Stewardship Fund
     8                 projects.
     9     Projects in the category of public improvement projects to be
    10  constructed by the Department of Conservation and Natural
    11  Resources, its successors or assigns and to be financed by
    12  current revenues of the Environmental Stewardship Fund are
    13  hereby itemized together with their respective estimated
    14  financial costs as follows:
    15                                                           Total
    16                                                          Project
    17             Project                                    Allocation
    18  (1)  Department of Conservation and Natural
    19     Resources
    20     (i)  Bald Eagle State Park
    21         (A)  Rehabilitate roads within the park         1,600,000
    22             (Base Project Allocation - $1,600,000)
    23         (B)  Replace courtesy docks at eight public
    24             boat launches                                 300,000
    25             (Base Project Allocation - $300,000)
    26         (C)  Rehabilitate office and visitors'
    27             center                                      1,750,000
    28             (Base Project Allocation - $1,750,000)
    29     (ii)  Beltzville State Park
    30         (A)  Rehabilitate sewage treatment plant
    20070H1589B2829                 - 197 -    

     1             and correct sewer line infiltration           400,000
     2             (Base Project Allocation - $400,000)
     3     (iii)  Bendigo State Park
     4         (A)  Replace bathhouse, lifeguard station
     5             and day use restrooms in the park           1,000,000
     6             (Base Project Allocation - $1,000,000)
     7     (iv)  Canoe Creek State Park
     8         (A)  Rehabilitate sewage treatment plant          300,000
     9             (Base Project Allocation - $300,000)
    10     (v)  Chapman State Park
    11         (A)  Rehabilitate beach house and comfort
    12             station                                     1,900,000
    13             (Base Project Allocation - $1,900,000)
    14     (vi)  Cherry Springs State Park
    15         (A)  Replace pit latrines with flush
    16             restrooms and sewers                          770,000
    17             (Base Project Allocation - $770,000)
    18     (vii)  Clear Creek State Park
    19         (A)  Rehabilitate water system and replace
    20             pit latrines                                2,000,000
    21             (Base Project Allocation - $2,000,000)
    22         (B)  Rehabilitate park roads and bridges        1,500,000
    23             (Base Project Allocation - $1,500,000)
    24     (viii)  Colonel Denning State Park
    25         (A)  Provide new day restroom, sewage and
    26             shower house                                  350,000
    27             (Base Project Allocation - $350,000)
    28         (B)  Provide bathhouse, concession,
    29             restroom and sewage                           500,000
    30             (Base Project Allocation - $500,000)
    20070H1589B2829                 - 198 -    

     1     (ix)  Cook Forest State Park
     2         (A)  Rehabilitation of trail, Phase II            250,000
     3             (Base Project Allocation - $250,000)
     4         (B)  Rehabilitate five campground
     5             washhouses                                    600,000
     6             (Base Project Allocation - $600,000)
     7         (C)  Replace park office and visitors'
     8             center                                      2,000,000
     9             (Base Project Allocation - $2,000,000)
    10         (D)  Replace six river cabins                   2,200,000
    11             (Base Project Allocation - $2,200,000)
    12         (E)  Rehabilitate sewage system and
    13             repairs                                       750,000
    14             (Base Project Allocation - $750,000)
    15         (F)  Provide repairs to the water system          750,000
    16             (Base Project Allocation - $750,000)
    17         (G)  Rehabilitate road and parking lot          1,100,000
    18             (Base Project Allocation - $1,100,000)
    19     (x)  Colton Point State Park
    20         (A)  Replace two pit latrines with
    21             composting restroom, playground, picnic
    22             area and campground shower house            1,500,000
    23             (Base Project Allocation - $1,500,000)
    24     (xi)  Elk State Park
    25         (A)  Replace comfort station                      150,000
    26             (Base Project Allocation - $150,000)
    27     (xii)  Erie Bluffs State Park
    28         (A)  Construct entrance to the park               300,000
    29             (Base Project Allocation - $300,000)
    30     (xiii)  Evansburg State Park
    20070H1589B2829                 - 199 -    

     1         (A)  Provide road paving for the park             335,000
     2             (Base Project Allocation - $335,000)
     3         (B)  Replace sewer lines                          250,000
     4             (Base Project Allocation - $250,000)
     5         (C)  Replace temporary restrooms, Phase II        250,000
     6             (Base Project Allocation - $250,000)
     7     (xiv)  Forest District 2
     8         (A)  Construct new resource management
     9             center                                      3,500,000
    10             (Base Project Allocation - $3,500,000)
    11     (xv)  Forest District 3
    12         (A)  Establish new maintenance headquarter
    13             buildings in Juniata, Mifflin and Perry
    14             Counties                                      800,000
    15             (Base Project Allocation - $800,000)
    16         (B)  Rehabilitate Gunter Valley Dam in
    17             Perry County                                5,000,000
    18             (Base Project Allocation - $5,000,000)
    19     (xvi)  Forest District 4
    20         (A)  Rehabilitate Linn Run Road                 2,500,000
    21             (Base Project Allocation - $2,500,000)
    22     (xvii)  Forest District 5
    23         (A)  Rehabilitate resource management
    24             center                                      1,500,000
    25             (Base Project Allocation - $1,500,000)
    26     (xviii)  Forest District 8
    27         (A)  Rehabilitate Kittanning Resource
    28             Management Center                           1,500,000
    29             (Base Project Allocation - $1,500,000)
    30     (xix)  Forest District 14
    20070H1589B2829                 - 200 -    

     1         (A)  Rehabilitate historic stone house            250,000
     2             (Base Project Allocation - $250,000)
     3     (xx)  Forest District 18
     4         (A)  SR 54 comfort station and parking            500,000
     5             (Base Project Allocation - $500,000)
     6         (B)  New resource management center             3,500,000
     7             (Base Project Allocation - $3,500,000)
     8         (C)  Rehabilitate Roaring Creek tract
     9             facilities                                    600,000
    10             (Base Project Allocation - $600,000)
    11         (D)  Rehabilitate Roaring Creek tract
    12             trails and bridges                          1,155,000
    13             (Base Project Allocation - $1,155,000)
    14         (E)  Maintenance to Haldeman complex              300,000
    15             (Base Project Allocation - $300,000)
    16     (xxi)  Forest District 19
    17         (A)  New resource management center             3,500,000
    18             (Base Project Allocation - $3,500,000)
    19         (B)  Rehabilitate Little Summit Fire
    20             Station maintenance complex                   300,000
    21             (Base Project Allocation - $300,000)
    22         (C)  Project for Pine Flats Road                  200,000
    23             (Base Project Allocation - $200,000)
    24         (D)  Project for Flat Ridge Road                  200,000
    25             (Base Project Allocation - $200,000)
    26     (xxii)  Forest District 20
    27         (A)  Pave Dry Run Road                            300,000
    28             (Base Project Allocation - $300,000)
    29         (B)  Provide for Hillsgrove storage
    30             building                                      300,000
    20070H1589B2829                 - 201 -    

     1             (Base Project Allocation - $300,000)
     2         (C)  Pave High Knob Road                          500,000
     3             (Base Project Allocation - $500,000)
     4     (xxiii)  Frances Slocum State Park
     5         (A)  Rehabilitate sewage treatment plant
     6             and lines                                     600,000
     7             (Base Project Allocation - $600,000)
     8     (xxiv)  French Creek State Park
     9         (A)  Rehabilitate Scotts Run area               1,500,000
    10             (Base Project Allocation - $1,500,000)
    11     (xxv)  Gifford Pinchot State Park
    12         (A)  Phase II rehabilitation of camp area
    13             washhouse                                     400,000
    14             (Base Project Allocation - $400,000)
    15     (xxvi)  Gouldsboro State Park
    16         (A)  Repair dam at the park                       750,000
    17             (Base Project Allocation - $750,000)
    18         (B)  Replace pit bathhouse, comfort station
    19             and boat rental                               600,000
    20             (Base Project Allocation - $600,000)
    21     (xxvii)  Greenwood Furnace State Park
    22         (A)  Make repairs to sewage treatment
    23             plant                                         900,000
    24             (Base Project Allocation - $900,000)
    25     (xxviii)  Hickory Run State Park
    26         (A)  Replace pit latrines and water tank        1,800,000
    27             (Base Project Allocation - $1,800,000)
    28         (B)  Phase II of group camp roof
    29             replacement                                   200,000
    30             (Base Project Allocation - $200,000)
    20070H1589B2829                 - 202 -    

     1         (C)  Replace office and visitors' center        2,000,000
     2             (Base Project Allocation - $2,000,000)
     3         (D)  Replace pit toilets and four
     4             buildings                                   1,250,000
     5             (Base Project Allocation - $1,250,000)
     6     (xxix)  Hills Creek State Park
     7         (A)  Rehabilitate spillway                        600,000
     8             (Base Project Allocation - $600,000)
     9         (B)  Provide office renovation addition and
    10             visitors' center                            2,100,000
    11             (Base Project Allocation - $2,100,000)
    12     (xxx)  Hyner Run State Park
    13         (A)  Rehabilitate two park bridges and pave
    14             roadway                                       600,000
    15             (Base Project Allocation - $600,000)
    16         (B)  Replace two day use restrooms                300,000
    17             (Base Project Allocation - $300,000)
    18     (xxxi)  Kettle Creek State Park
    19         (A)  Provide bathhouse, shower house and
    20             sewage                                      1,800,000
    21             (Base Project Allocation - $1,800,000)
    22     (xxxii)  Kooser State Park
    23         (A)  Rehabilitate park roads and bridges        1,300,000
    24             (Base Project Allocation - $1,300,000)
    25     (xxxiii)  Lackawanna State Park
    26         (A)  Replace park office                        1,500,000
    27             (Base Project Allocation - $1,500,000)
    28         (B)  Rehabilitate pool complex and day use
    29             area                                        3,000,000
    30             (Base Project Allocation - $3,000,000)
    20070H1589B2829                 - 203 -    

     1     (xxxiv)  Laurel Hill State Park
     2         (A)  Breach Spruce Run Dam                        250,000
     3             (Base Project Allocation - $250,000)
     4         (B)  Provide Jones Mill Run Dam dredging          250,000
     5             (Base Project Allocation - $250,000)
     6         (C)  Rehabilitate group camp three sewage
     7             lines                                         250,000
     8             (Base Project Allocation - $250,000)
     9         (D)  Provide camping cottage shower house
    10             at the park                                   650,000
    11             (Base Project Allocation - $650,000)
    12         (E)  Rehabilitate contact station and
    13             parking                                       500,000
    14             (Base Project Allocation - $500,000)
    15     (xxxv)  Laurel Ridge State Park
    16         (A)  Replace turnpike trail bridge
    17             superstructure                              1,200,000
    18             (Base Project Allocation - $1,200,000)
    19     (xxxvi)  Little Pine State Park
    20         (A)  Rehabilitate dam                             500,000
    21             (Base Project Allocation - $500,000)
    22     (xxxvii)  Lyman Run State Park
    23         (A)  Provide construction to the spillway
    24             bridge                                        500,000
    25             (Base Project Allocation - $500,000)
    26     (xxxviii)  Marsh Creek State Park
    27         (A)  Pave all parking lots in the park            325,000
    28             (Base Project Allocation - $325,000)
    29         (B)  Provide ADA office expansion                 150,000
    30             (Base Project Allocation - $150,000)
    20070H1589B2829                 - 204 -    

     1     (xxxix)  McConnells Mill State Park
     2         (A)  Rehabilitate the park road                   275,000
     3             (Base Project Allocation - $275,000)
     4     (xl)  Moraine State Park
     5         (A)  Resurface bike trail in park               1,200,000
     6             (Base Project Allocation - $1,200,000)
     7         (B)  Rehabilitate Old 422 launch and road       1,000,000
     8             (Base Project Allocation - $1,000,000)
     9     (xli)  Neshaminy State Park
    10         (A)  Rehabilitate jetty                           350,000
    11             (Base Project Allocation - $350,000)
    12     (xlii)  Nockamixon State Park
    13         (A)  Provide paving in the park                   500,000
    14             (Base Project Allocation - $500,000)
    15         (B)  Replace three pit toilets                  1,000,000
    16             (Base Project Allocation - $1,000,000)
    17     (xliii)  Ohiopyle State Park
    18         (A)  Rehabilitate residence                       250,000
    19             (Base Project Allocation - $250,000)
    20         (B)  Replace bridge 0902-CSX 2288                 300,000
    21             (Base Project Allocation - $300,000)
    22         (C)  Construct parking above new office           900,000
    23             (Base Project Allocation - $900,000)
    24         (D)  Provide park office accessibility          2,000,000
    25             (Base Project Allocation - $2,000,000)
    26         (E)  Provide bathhouse, shower house and
    27             sewage                                        275,000
    28             (Base Project Allocation - $275,000)
    29     (xliv)  Oil Creek State Park
    30         (A)  Rehabilitate Boughton Bridge                 400,000
    20070H1589B2829                 - 205 -    

     1             (Base Project Allocation - $400,000)
     2         (B)  Phase I to repair trail slips                300,000
     3             (Base Project Allocation - $300,000)
     4     (xlv)  Parker Dam State Park
     5         (A)  Rehabilitate dam spillway                    350,000
     6             (Base Project Allocation - $350,000)
     7     (xlvi)  Park Region 1
     8         (A)  Rehabilitate surface water
     9             systems/filter                                300,000
    10             (Base Project Allocation - $300,000)
    11         (B)  Rehabilitate surface and well water
    12             supplies in Region 1 State parks            1,500,000
    13             (Base Project Allocation - $1,500,000)
    14     (xlvii)  Park Region 2
    15         (A)  Rehabilitate the residence                   250,000
    16             (Base Project Allocation - $250,000)
    17     (xlviii)  Pine Grove Furnace State Park
    18         (A)  Rehabilitate water treatment plant         2,000,000
    19             (Base Project Allocation - $2,000,000)
    20         (B)  Rehabilitate various buildings             3,400,000
    21             (Base Project Allocation - $3,400,000)
    22     (xlix)  Presque Isle State Park
    23         (A)  Provide bike trail extension to the
    24             Tom Ridge Environmental Center              1,800,000
    25             (Base Project Allocation - $1,800,000)
    26     (l)  Prince Gallitzin State Park
    27         (A)  Rehabilitate sewage treatment plant          800,000
    28             (Base Project Allocation - $800,000)
    29         (B)  Rehabilitate Beaver Valley Marina          2,900,000
    30             (Base Project Allocation - $2,900,000)
    20070H1589B2829                 - 206 -    

     1     (li)  Promised Land State Park
     2         (A)  Rehabilitate sewer line                      750,000
     3             (Base Project Allocation - $750,000)
     4         (B)  Replace bridge and spillway                3,100,000
     5             (Base Project Allocation - $3,100,000)
     6         (C)  Rehabilitate Pickerel Point and
     7             Deerfield campgrounds                       3,000,000
     8             (Base Project Allocation - $3,000,000)
     9         (D)  Rehabilitate boat rental area                500,000
    10             (Base Project Allocation - $500,000)
    11         (E)  Rehabilitate dump station                    300,000
    12             (Base Project Allocation - $300,000)
    13         (F)  Rehabilitate bridges                         120,000
    14             (Base Project Allocation - $120,000)
    15     (lii)  Pymatuning State Park
    16         (A)  Rehabilitate Espyville south launch
    17             and environs                                1,500,000
    18             (Base Project Allocation - $1,500,000)
    19         (B)  Rehabilitate Jamestown beach house           650,000
    20             (Base Project Allocation - $650,000)
    21         (C)  Rehabilitate sanitary facilities on
    22             the west side                               2,200,000
    23             (Base Project Allocation - $2,200,000)
    24     (liii)  Raccoon Creek State Park
    25         (A)  Provide roadway slip repairs                 800,000
    26             (Base Project Allocation - $800,000)
    27         (B)  Phase II rehabilitation of roads             300,000
    28             (Base Project Allocation - $300,000)
    29     (liv)  Ralph Stover State Park
    30         (A)  Replace pit latrines and sewer               500,000
    20070H1589B2829                 - 207 -    

     1             (Base Project Allocation - $500,000)
     2     (lv)  Ricketts Glen State Park
     3         (A)  Rehabilitate bathhouse and comfort
     4             stations                                    2,800,000
     5             (Base Project Allocation - $2,800,000)
     6         (B)  Rehabilitate roads and provide paving
     7             for parking lots                              650,000
     8             (Base Project Allocation - $650,000)
     9         (C)  Replace pit latrine Route 118 picnic
    10             area                                          400,000
    11             (Base Project Allocation - $400,000)
    12         (D)  Repair infiltration, sewage treatment
    13             plant and water system                        550,000
    14             (Base Project Allocation - $550,000)
    15     (lvi)  Ridley Creek State Park
    16         (A)  Reroof maintenance building                  400,000
    17             (Base Project Allocation - $400,000)
    18         (B)  Pave parking lot                             300,000
    19             (Base Project Allocation - $300,000)
    20     (lvii)  Salt Springs State Park
    21         (A)  Replace vault latrine                        300,000
    22             (Base Project Allocation - $300,000)
    23     (lviii)  Samuel S. Lewis State Park
    24         (A)  Provide two new comfort stations with
    25             on-lot sewage                                 750,000
    26             (Base Project Allocation - $750,000)
    27     (lix)  Shawnee State Park
    28         (A)  Rehabilitate water treatment plant         1,200,000
    29             (Base Project Allocation - $1,200,000)
    30     (lx)  Sinnemahoning State Park
    20070H1589B2829                 - 208 -    

     1         (A)  Rehabilitate main park road and
     2             replace bridges                             1,000,000
     3             (Base Project Allocation - $1,000,000)
     4     (lxi)  Sizerville State Park
     5         (A)  Modernize pit latrines and bathhouse       2,000,000
     6             (Base Project Allocation - $2,000,000)
     7         (B)  Provide new park office and visitors'
     8             center                                      1,800,000
     9             (Base Project Allocation - $1,800,000)
    10     (lxii)  Tiadaghton State Forest
    11         (A)  Construct Tiadaghton Management
    12             Center                                      4,500,000
    13             (Base Project Allocation - $4,500,000)
    14     (lxiii)  Tobyhanna State Park
    15         (A)  Rehabilitate day use area and
    16             campground                                  2,500,000
    17             (Base Project Allocation - $2,500,000)
    18     (lxiv)  Whipple Dam State Park
    19         (A)  Provide new multifunction beach
    20             building                                    1,200,000
    21             (Base Project Allocation - $1,200,000)
    22     (lxv)  Yellow Creek State Park
    23         (A)  Provide camping cottage shower house         650,000
    24             (Base Project Allocation - $650,000)
    25     (lxvi)  White Clay Creek Preserve
    26         (A)  Rebuild London Tract wall                    150,000
    27             (Base Project Allocation - $150,000)
    28     (lxvii)  Worlds End State Park
    29         (A)  Rehabilitate campground and day use
    30             area roads                                    350,000
    20070H1589B2829                 - 209 -    

     1             (Base Project Allocation - $350,000)
     2     (lxviii)  Various parks, Statewide
     3         (A)  Acquire land to be incorporated within
     4             the park system according to the
     5             Commonwealth's master plan                 10,000,000
     6             (Land Allocation - $10,000,000)
     7  Section 10.  Itemization of State forestry bridge projects.
     8     Projects in the category of State forestry bridge projects to
     9  be constructed by the Department of Conservation and Natural
    10  Resources, its successors or assigns, and to be financed by oil
    11  company franchise tax revenues pursuant to 75 Pa.C.S. §
    12  9502(a)(2)(iv) (relating to imposition of tax) are hereby
    13  itemized, together with their respective estimated costs, as
    14  follows:
    15                                                           Total
    16                                                          Project
    17             Project                                    Allocation
    18  (1)  Centre County
    19     (i)  Forest District 9
    20         (A)  Project for Meyers Run Road and Black
    21             Moshannon Creek                               400,000
    22         (B)  Project for North Run Road over Smays
    23             Run                                           300,000
    24  (2)  Clearfield County
    25     (i)  Forest District 9
    26         (A)  Project for Shirks Road over Black
    27             Moshannon Creek bridge No. 9-0028             300,000
    28         (B)  Project for Reservoir Road over Upper
    29             Three Run                                     300,000
    30         (C)  Project for Little Medix Road over
    20070H1589B2829                 - 210 -    

     1             Little Medix Run, bridge No. 9-0012           300,000
     2  (3)  Clinton County
     3     (i)  Forest District 10
     4         (A)  Project for Beaver Dam Road over
     5             Beaver Dam Run                                300,000
     6         (B)  Project for Birch Island Road over
     7             Amos Branch, bridge No. 10-0040               300,000
     8  (4)  Elk County
     9     (i)  Forest District 13
    10         (A)  Project for East Hicks Road over Barr
    11             Hollow                                        300,000
    12         (B)  Project for Little Dents Road over
    13             Dents Run Bridge No. 13-0032                  300,000
    14         (C)  Project for Dents Run Road over Little
    15             Bear Run                                      300,000
    16         (D)  Project for Dents Run Road over
    17             Weatherboard Run                              300,000
    18         (E)  Project for bridge over North Fork           300,000
    19  (5)  Huntingdon County
    20     (i)  Forest District 5
    21         (A)  Project for Krise Valley Road bridge         300,000
    22  (6)  Lycoming County
    23     (i)  Forest District 12
    24         (A)  Project for Trout Run Road and
    25             bridges                                       600,000
    26         (B)  Project for Frances Road over unnamed
    27             tributary near Black Forest Trail             300,000
    28  (7)  Perry County
    29     (i)  Forest District 3
    30         (A)  Project for the Second Narrows Road
    20070H1589B2829                 - 211 -    

     1             bridge                                        300,000
     2  (8)  Tioga County
     3     (i)  Forest District 12
     4         (A)  Project for Francis Road over unnamed
     5             tributary at Pipeline Road                    300,000
     6         (B)  Project for Francis Road over Woodward
     7             Hollow                                        300,000
     8         (C)  Project for Francis Road over Randall
     9             Hollow bridge No. 12-9003                     300,000
    10         (D)  Project for Francis Road over Kramer
    11             Hollow bridge No. 12-9016                     300,000
    12         (E)  Project for Francis Road over Francis
    13             Branch bridge No. 12-0048                     300,000
    14     (ii)  Forest District 16
    15         (A)  Project for Spoor Hollow Road over
    16             Norris Brook bridge No. 16-0001               300,000
    17         (B)  Project for Cedar Mountain Road over
    18             Cedar Run bridge No. 16-0014                  300,000
    19  (9)  Union County
    20     (i)  Forest District 7
    21         (A)  Replace Brandon Road bridge                  300,000
    22         (B)  Project for Cooper Mill Road bridge          300,000
    23  (10)  Clearfield and Elk Counties
    24     (i)  Forest District 9
    25         (A)  Project for three culverts on Little
    26             Medix Road over Little Medix Run              400,000
    27  Section 11.  Itemization of General Fund current revenue
    28                 projects.
    29     The individual capital projects in the category of public
    30  improvement projects to be constructed or acquired by the
    20070H1589B2829                 - 212 -    

     1  Department of General Services, its successors or assigns, and
     2  to be financed from General Fund current revenues, are hereby
     3  itemized, together with their respective estimated financial
     4  costs, as follows:
     5                                                           Total
     6                                                          Project
     7             Project                                    Allocation
     8  (1)  Department of Corrections
     9     (i)  State Correctional Institution at Albion
    10         (A)  Lease and/or purchase an emergency
    11             housing facility along with related
    12             infrastructure improvements                 2,000,000  <--
    13             (Base Project Allocation - $2,000,000)
    14             INFRASTRUCTURE IMPROVEMENTS                 2,500,000  <--
    15             (BASE PROJECT ALLOCATION - $2,500,000)
    16     (ii)  State Correctional Institution at
    17         Cambridge Springs
    18         (A)  Lease and/or purchase an emergency
    19             housing facility along with related
    20             infrastructure improvements                 2,000,000  <--
    21             (Base Project Allocation - $2,000,000)
    22             INFRASTRUCTURE IMPROVEMENTS                 2,500,000  <--
    23             (BASE PROJECT ALLOCATION - $2,500,000)
    24     (iii)  State Correctional Institution at
    25         Greensburg
    26         (A)  Lease and/or purchase an emergency
    27             housing facility along with related
    28             infrastructure improvements                 2,000,000  <--
    29             (Base Project Allocation - $2,000,000)
    30             INFRASTRUCTURE IMPROVEMENTS                 2,500,000  <--
    20070H1589B2829                 - 213 -    

     1             (BASE PROJECT ALLOCATION - $2,500,000)
     2     (iv)  State Correctional Institution at
     3         Houtzdale
     4         (A)  Lease and/or purchase an emergency
     5             housing facility along with related
     6             infrastructure improvements                 2,000,000  <--
     7             (Base Project Allocation - $2,000,000)
     8             INFRASTRUCTURE IMPROVEMENTS                 2,500,000  <--
     9             (BASE PROJECT ALLOCATION - $2,500,000)
    10     (v)  State Correctional Institution at Laurel
    11         Highlands
    12         (A)  Lease and/or purchase two separate
    13             emergency housing facilities along with
    14             related infrastructure improvements         4,000,000
    15             (Base Project Allocation - $4,000,000)
    16     (vi)  State Correctional Institution at Mahanoy
    17         (A)  Lease and/or purchase an emergency
    18             housing facility along with related
    19             infrastructure improvements                 2,000,000  <--
    20             (Base Project Allocation - $2,000,000)
    21             INFRASTRUCTURE IMPROVEMENTS                 2,500,000  <--
    22             (BASE PROJECT ALLOCATION - $2,500,000)
    23     (vii)  State Correctional Institution at Muncy
    24         (A)  Lease and/or purchase two separate
    25             emergency housing facilities along with
    26             related infrastructure improvements         4,000,000
    27             (Base Project Allocation - $4,000,000)
    28     (viii)  State Correctional Institution at Pine
    29         Grove
    30         (A)  Lease and/or purchase an emergency
    20070H1589B2829                 - 214 -    

     1             housing facility along with related
     2             infrastructure improvements                 2,000,000  <--
     3             (Base Project Allocation - $2,000,000)
     4             INFRASTRUCTURE IMPROVEMENTS                 2,500,000  <--
     5             (BASE PROJECT ALLOCATION - $2,500,000)
     6     (ix)  State Correctional Institution at Retreat
     7         (A)  Lease and/or purchase an emergency
     8             housing facility along with related
     9             infrastructure improvements                 3,500,000
    10             (Base Project Allocation - $3,500,000)
    11     (x)  State Correctional Institution at Rockview
    12         (A)  Lease and/or purchase an emergency
    13             housing facility along with related
    14             infrastructure improvements                 2,000,000  <--
    15             (Base Project Allocation - $2,000,000)
    16             INFRASTRUCTURE IMPROVEMENTS                 2,500,000  <--
    17             (BASE PROJECT ALLOCATION - $2,500,000)
    18  (2)  Pennsylvania Historical and Museum Commission
    19     (i)  Pennsylvania Military Museum
    20         (A)  Design and construct a 2,500-square-
    21             foot storage building for historical
    22             military vehicles                             600,000
    23             (Base Project Allocation - $500,000)
    24             (Design and Contingencies - $100,000)
    25  Section 11.1.  Itemization of Manufacturing Fund Current Revenue  <--
    26                 Projects CURRENT REVENUE PROJECTS.                 <--
    27     (a)  Public improvement projects.--The individual capital
    28  projects in the category of public improvement projects to be
    29  developed by the Department of General Services, its successors
    30  or assigns, for the Department of Corrections and to be financed
    20070H1589B2829                 - 215 -    

     1  from current revenues of the Manufacturing Fund are hereby
     2  itemized together with their respective itemized costs as
     3  follows:
     4                                                           Total
     5                                                          Project
     6             Project                                    Allocation
     7  (1)  Department of Corrections
     8     (i)  State Correctional Institution at
     9         Frackville
    10         (A)  Modify an existing building into a
    11             regional laundry facility for
    12             correctional industries including
    13             laundry equipment                           3,000,000
    14             (Base Project Allocation - $3,000,000)
    15  SECTION 11.2.  ITEMIZATION OF PENNSYLVANIA FISH AND BOAT          <--
    16                 COMMISSION CAPITAL PROJECTS.
    17     THE INDIVIDUAL CAPITAL PROJECTS IN THE CATEGORY OF PUBLIC
    18  IMPROVEMENTS PROJECTS TO BE ACQUIRED OR DEVELOPED BY THE
    19  PENNSYLVANIA FISH AND BOAT COMMISSION AND TO BE FINANCED BY THE
    20  INCURRING OF DEBT OR BY THE CURRENT REVENUES OF THE FISH FUND
    21  AND THE BOAT FUND PURSUANT TO EXECUTIVE AUTHORIZATIONS ARE
    22  HEREBY ITEMIZED TOGETHER WITH THEIR RESPECTIVE ESTIMATED COSTS,
    23  AS FOLLOWS:                                              TOTAL
    24                                                          PROJECT
    25             PROJECT                                    ALLOCATION
    26  (1)  PENNSYLVANIA FISH AND BOAT COMMISSION
    27     (I)  WASHINGTON COUNTY
    28         (A)  REHABILITATION AND REPAIRS, INCLUDING
    29             INFRASTRUCTURE IMPROVEMENTS, DUTCH FORK
    30             LAKE DAM                                    9,000,000
    20070H1589B2829                 - 216 -    

     1  Section 11.2. 11.3  Limited waiver of local requirements.         <--
     2     The limitation on Department of Transportation funding of
     3  capital projects under 74 Pa.C.S. § 1302(4) (relating to program
     4  authorizations) shall be totally waived for the capital projects
     5  in the category of transportation assistance projects for mass
     6  transit contained in section 5(a)(7.1)(iv) 5(A)(7.2)(IV) and      <--
     7  (v).
     8  Section 12.  Debt authorization.
     9     (a)  Public improvements.--The Governor, Auditor General and
    10  State Treasurer are hereby authorized and directed to borrow
    11  from time to time in addition to any authorization heretofore or
    12  hereafter enacted, on the credit of the Commonwealth, subject to
    13  the limitations provided in the current capital budget, money
    14  not exceeding in the aggregate the sum of $1,548,730,000          <--
    15  $3,723,177,000 as may be found necessary to carry out the         <--
    16  acquisition and construction of the public improvement projects
    17  specifically itemized in a capital budget.
    18     (b)  Furniture and equipment.--The Governor, Auditor General
    19  and State Treasurer are hereby authorized and directed to borrow
    20  from time to time in addition to any authorization heretofore or
    21  hereafter enacted, on the credit of the Commonwealth, subject to
    22  the limitations provided in the current capital budget, money
    23  not exceeding in the aggregate the sum of $81,846,000             <--
    24  $136,346,000 as may be found necessary to carry out the           <--
    25  acquisition and construction of the public improvement projects
    26  consisting of the acquisition of original movable furniture and
    27  equipment specifically itemized in a capital budget.
    28     (c)  Transportation assistance.--The Governor, Auditor
    29  General and State Treasurer are hereby authorized and directed
    30  to borrow from time to time in addition to any authorization
    20070H1589B2829                 - 217 -    

     1  heretofore or hereafter enacted, on the credit of the
     2  Commonwealth, subject to the limitations provided in the current
     3  capital budget, money not exceeding in the aggregate the sum of
     4  $428,978,000 $671,739,000 as may be found necessary to carry out  <--
     5  the acquisition and construction of the transportation
     6  assistance projects specifically itemized in a capital budget.
     7     (d)  Redevelopment assistance.--Subject to the limitation in
     8  section 317(b) of the act of February 9, 1999 (P.L.1, No.1),
     9  known as the Capital Facilities Debt Enabling Act, the Governor,
    10  Auditor General and State Treasurer are hereby authorized and
    11  directed to borrow from time to time in addition to any
    12  authorization heretofore or hereafter enacted, on the credit of
    13  the Commonwealth, subject to the limitations provided in the
    14  current capital budget, money not exceeding in the aggregate the
    15  sum of $1,847,616,000 $4,497,578,000 as may be found necessary    <--
    16  to carry out the redevelopment assistance and the redevelopment
    17  assistance capital projects specifically itemized in a capital
    18  budget.
    19     (e)  Flood control.--The Governor, Auditor General and State
    20  Treasurer are hereby authorized and directed to borrow from time
    21  to time in addition to any authorization heretofore or hereafter
    22  enacted, on the credit of the Commonwealth, subject to the
    23  limitations provided in the current capital budget, money not
    24  exceeding in the aggregate the sum of $21,726,000 $39,226,000 as  <--
    25  may be found necessary to carry out the acquisition and
    26  construction of the flood control projects specifically itemized
    27  in a capital budget.
    28     (F)  PENNSYLVANIA FISH AND BOAT COMMISSION PROJECTS.--THE      <--
    29  GOVERNOR, AUDITOR GENERAL AND STATE TREASURER ARE HEREBY
    30  AUTHORIZED AND DIRECTED TO BORROW FROM TIME TO TIME IN ADDITION
    20070H1589B2829                 - 218 -    

     1  TO ANY AUTHORIZATION HERETOFORE OR HEREAFTER ENACTED, ON THE
     2  CREDIT OF THE COMMONWEALTH, SUBJECT TO THE LIMITATIONS PROVIDED
     3  IN THE CURRENT CAPITAL BUDGET, MONEY NOT EXCEEDING IN THE
     4  AGGREGATE SUM OF $9,000,000 AS MAY BE FOUND NECESSARY TO CARRY
     5  OUT THE ACQUISITION AND CONSTRUCTION OF THE PENNSYLVANIA FISH
     6  AND BOAT COMMISSION PROJECTS SPECIFICALLY ITEMIZED IN THIS
     7  CAPITAL BUDGET.
     8  Section 13.  Issue of bonds.
     9     The indebtedness authorized in this act shall be incurred
    10  from time to time and shall be evidenced by one or more series
    11  of general obligation bonds of the Commonwealth in such
    12  aggregate principal amount for each series as the Governor, the
    13  Auditor General and the State Treasurer shall determine, but the
    14  latest stated maturity date shall not exceed the estimated
    15  useful life of the projects being financed as stated in section
    16  15.
    17  Section 14.  Estimated useful life and term of debt.
    18     (a)  Estimated useful life.--The General Assembly states that
    19  the estimated useful life of the public improvement projects
    20  itemized in this act is as follows:
    21         (1)  Public improvement projects, 30 years.
    22         (2)  Furniture and equipment projects, 10 years.
    23         (3)  Transportation assistance projects:
    24             (i)  Rolling stock, 15 years.
    25             (ii)  Passenger buses, 12 years.
    26             (iii)  Furniture and equipment, 10 years.
    27             (iv)  All others, 30 years.
    28     (b)  Term of debt.--The maximum term of the debt authorized
    29  to be incurred under this act is 30 years.
    30  Section 15.  Appropriations.
    20070H1589B2829                 - 219 -    

     1     (a)  Public improvements.--The net proceeds of the sale of
     2  the obligations authorized in this act are hereby appropriated
     3  from the Capital Facilities Fund to the Department of General
     4  Services in the maximum amount of $1,548,730,000 $3,723,177,000   <--
     5  to be used by it exclusively to defray the financial cost of the
     6  public improvement projects specifically itemized in a capital
     7  budget. After reserving or paying the expenses of the sale of
     8  the obligation, the State Treasurer shall pay to the Department
     9  of General Services the moneys as required and certified by it
    10  to be legally due and payable.
    11     (b)  Furniture and equipment.--The net proceeds of the sale
    12  of the obligations authorized in this act are hereby
    13  appropriated from the Capital Facilities Fund to the Department
    14  of General Services in the maximum amount of $81,846,000          <--
    15  $136,346,000 to be used by it exclusively to defray the           <--
    16  financial cost of the public improvement projects consisting of
    17  the acquisition of original movable furniture and equipment
    18  specifically itemized in a capital budget. After reserving or
    19  paying the expenses of the sale of the obligation, the State
    20  Treasurer shall pay to the Department of General Services the
    21  moneys as required and certified by it to be legally due and
    22  payable.
    23     (c)  Transportation assistance.--The net proceeds of the sale
    24  of the obligations authorized in this act are hereby
    25  appropriated from the Capital Facilities Fund to the Department
    26  of Transportation in the maximum amount of $428,978,000           <--
    27  $671,739,000 to be used by it exclusively to defray the           <--
    28  financial cost of the transportation assistance projects
    29  specifically itemized in a capital budget. After reserving or
    30  paying the expenses of the sale of the obligation, the State
    20070H1589B2829                 - 220 -    

     1  Treasurer shall pay to the Department of Transportation the
     2  moneys as required and certified by it to be legally due and
     3  payable.
     4     (d)  Redevelopment assistance.--The net proceeds of the sale
     5  of the obligations authorized in this act are hereby
     6  appropriated from the Capital Facilities Fund to the Department
     7  of Community and Economic Development in the maximum amount of
     8  $1,847,616,000 $4,497,578,000 to be used by it exclusively to     <--
     9  defray the financial cost of the redevelopment assistance and
    10  redevelopment assistance capital projects specifically itemized
    11  in a capital budget. After reserving or paying the expenses of
    12  the sale of the obligation, the State Treasurer shall pay to the
    13  Department of Community and Economic Development the moneys as
    14  required and certified by it to be legally due and payable.
    15     (e)  Flood control.--The net proceeds of the sale of the
    16  obligations authorized in this act are hereby appropriated from
    17  the Capital Facilities Fund to the Department of Environmental
    18  Protection in the maximum amount of $21,726,000 $39,226,000 to    <--
    19  be used by it exclusively to defray the financial cost of the
    20  flood control projects specifically itemized in a capital
    21  budget. After reserving or paying the expenses of the sale of
    22  the obligation, the State Treasurer shall pay to the Department
    23  of Environmental Protection the moneys as required and certified
    24  by it to be legally due and payable.
    25     (F)  PENNSYLVANIA FISH AND BOAT COMMISSION PROJECTS.--THE NET  <--
    26  PROCEEDS OF THE SALE OF THE OBLIGATIONS AUTHORIZED IN THIS ACT
    27  ARE HEREBY APPROPRIATED FROM THE CAPITAL FACILITIES FUND TO THE
    28  PENNSYLVANIA FISH AND BOAT COMMISSION IN THE MAXIMUM AMOUNT OF
    29  $9,000,000 TO BE USED BY IT EXCLUSIVELY TO DEFRAY THE FINANCIAL
    30  COST OF THE PENNSYLVANIA FISH AND BOAT COMMISSION PROJECTS
    20070H1589B2829                 - 221 -    

     1  SPECIFICALLY ITEMIZED IN A CAPITAL BUDGET. AFTER RESERVING OR
     2  PAYING THE EXPENSE OF THE SALE OF THE OBLIGATION, THE STATE
     3  TREASURER SHALL PAY TO THE PENNSYLVANIA FISH AND BOAT COMMISSION
     4  THE MONEYS AS REQUIRED AND CERTIFIED BY IT TO BE LEGALLY DUE AND
     5  PAYABLE.
     6  Section 16.  Federal funds.
     7     In addition to those funds appropriated in section 15, all
     8  moneys received from the Federal Government for the projects
     9  specifically itemized in this act are also hereby appropriated
    10  for those projects.
    11  Section 17.  Delegation.
    12     Notwithstanding any provision of law to the contrary, the
    13  Department of General Services may delegate the design and
    14  construction of the project contained in section 3(9)(iv)(A)      <--
    15  3(9)(IX)(A) to Drexel University.                                 <--
    16  Section 18.  Department of Corrections facilities.
    17     (a)  Preemption of local ordinances.--Capital projects in the
    18  category of public improvement projects specifically itemized
    19  for the Department of Corrections in section 3(4)(i), (iii),
    20  (vi), (ix), (x)(B), (xi)(B), (xii)(B), (xiii), (xiv) and (xv)(B)  <--
    21  (VI), (VIII), (IX), (X)(B), (XI)(B), (XII)(B), (XIII), (XIV),     <--
    22  (XV)(B), (XVI) AND (XVIII) AND SECTION 11(1) of this act are
    23  hereby authorized to be constructed, erected or acquired by the
    24  Department of General Services, its successors or assigns, of
    25  the Department of Corrections, notwithstanding any zoning
    26  ordinance, land use ordinance, building code or other regulation
    27  adopted or enacted by a political subdivision under the
    28  authority of any statute or under the authority of any home rule
    29  charter authorized and adopted under any statute or the
    30  Constitution of Pennsylvania.
    20070H1589B2829                 - 222 -    

     1     (b)  Preemption of local ordinances for 2005-2006 projects.--
     2  Capital projects in the category of public improvement projects
     3  specifically itemized for the Department of Corrections in
     4  section 3(5)(iv.2)(A), (iv.4)(A) and (v.1)(A) of the act of July
     5  7, 2006 (P.L.390, No.83), known as the Capital Budget Project
     6  Itemization Act of 2005-2006, are hereby authorized to be
     7  constructed, erected or acquired by the Department of General
     8  Services, its successors or assigns, of the Department of
     9  Corrections, notwithstanding any zoning ordinance, land use
    10  ordinance, building code or other regulation adopted or enacted
    11  by a political subdivision under the authority of any statute or
    12  under the authority of any home rule charter authorized and
    13  adopted under any statute or the Constitution of Pennsylvania.
    14     (c)  Preemption of local ordinances for 2001-2002 projects.--
    15  The capital projects in the category of public improvement
    16  projects specifically itemized for the Department of Corrections
    17  in section 3(4)(xi)(A) of the act of October 30, 2002 (P.L.891,
    18  No.131), known as the Capital Budget Project Itemization Act of
    19  2001-2002, are hereby authorized to be constructed, erected or
    20  acquired by the Department of General Services, its successors
    21  or assigns, of the Department of Corrections, notwithstanding
    22  any zoning ordinance, land use ordinance, building code or other
    23  regulation adopted or enacted by a political subdivision under
    24  the authority of any statute or under the authority of any home
    25  rule charter authorized and adopted under any statute or the
    26  Constitution of Pennsylvania.
    27  Section 19.  Special contract provisions for Department of
    28                 Corrections projects.
    29     The Department of General Services shall use the competitive
    30  sealed proposal method of source selection to enter into a
    20070H1589B2829                 - 223 -    

     1  design/build contract for the projects which are authorized in
     2  section 3(4)(i), (iii), (vi), (viii), (ix), (x)(B), (xi)(B),
     3  (xii)(B), (xiii), (xiv), (xv), (XVI) AND (XVIII) and section      <--
     4  7(1). Notwithstanding the provisions of 62 Pa.C.S. § 322(6)
     5  (relating to specific construction powers, duties and
     6  procedures), the Department of General Services, upon approval
     7  of the Secretary of the Budget, may SHALL comply with the         <--
     8  provisions of the act of May 1, 1913 (P.L.155, No.104), referred
     9  to as the Separations Act, by entering into a design/build
    10  contract which requires that the design/build contractor comply
    11  with the requirements of the Separations Act. Any Department of   <--
    12  Corrections project which is authorized in section 3(4)(i),
    13  (iii), (vi), (viii), (ix), (x)(B), (xi)(B), (xii)(B), (xiii),
    14  (xiv), (xv) or section 7(1) shall be exempt from the provisions
    15  of the act of March 3, 1978 (P.L.6, No.3), known as the Steel
    16  Products Procurement Act. The Secretary of the Budget shall give
    17  notification of any such design/build contracts to the chairman
    18  and minority chairman of the Appropriations Committee of the
    19  Senate and the chairman and minority chairman of the
    20  Appropriations Committee of the House of Representatives ten
    21  days prior to advertising for a developer. Any Department of
    22  Corrections public improvement project-eligible expenditure of
    23  funds incurred prior to the effective date of this act which is
    24  directly related to a project PUBLIC improvement capital project  <--
    25  itemized in section 3(4)(i), (iii), (vi), (viii), (ix), (x)(B),
    26  (xi)(B), (xii)(B), (xiii), (xiv), (xv) or section 7(1) shall be
    27  considered eligible to be utilized as a portion of the
    28  expenditure of funds and may be considered as eligible for
    29  reimbursement from capital funds for a project PUBLIC             <--
    30  improvement capital project itemized in section 3(4)(i), (iii),
    20070H1589B2829                 - 224 -    

     1  (vi), (viii), (ix), (x)(B), (xi)(B), (xii)(B), (xiii), (xiv),
     2  (xv), (XVI) AND (XVIII) or section 7(1).                          <--
     3  Section 20.  Special contract provisions for Department of
     4                 Conservation and Natural Resources projects.
     5     Any Department of Conservation and Natural Resources public
     6  improvement project-eligible expenditure of funds incurred prior
     7  to the effective date of this act which is directly related to a
     8  project PUBLIC improvement capital project itemized in section    <--
     9  3(3)(xxi) shall be considered eligible to be utilized as a
    10  portion of the expenditure of funds and may be considered as
    11  eligible for reimbursement from capital funds for a project       <--
    12  PUBLIC improvement capital project itemized in section            <--
    13  3(3)(xxi).
    14  SECTION 21.  DEPARTMENT OF GENERAL SERVICES AUTHORIZATION.        <--
    15     THE DEPARTMENT OF GENERAL SERVICES IS AUTHORIZED, SUBJECT TO
    16  EXECUTIVE APPROVAL AND AUTHORIZATION, TO CONSTRUCT THE FAMILY
    17  COURT BUILDING ITEMIZED IN SECTION 3(7)(IV)(E) BY CONTRACT
    18  AWARDED BY THE DEPARTMENT OF GENERAL SERVICES OR TO ACQUIRE THE
    19  FAMILY COURT BUILDING BY MEANS OF A LEASE WITH AN OPTION TO
    20  PURCHASE.
    21  SECTION 22.  PRECONDITION ON AIRPORT PROJECT.
    22     NO AMOUNTS ALLOCATED TO THE PROJECT DESCRIBED IN SECTIONS
    23  5(C)(4)(I)(A) AND 6(40)(VI)(A) SHALL BE PAID OR OTHERWISE
    24  RELEASED UNTIL THE FOLLOWING CONDITIONS HAVE BEEN MET:
    25         (1)  THE PROJECT HAS BEEN APPROVED BY THE FEDERAL
    26     AVIATION ADMINISTRATION AND THE BUREAU OF AVIATION IN THE
    27     PENNSYLVANIA DEPARTMENT OF TRANSPORTATION.
    28         (2)  THAT THE REPORT SUBMITTED BY THE LEGISLATIVE BUDGET
    29     AND FINANCE COMMITTEE PURSUANT TO SENATE RESOLUTION 144 OF
    30     2007 RECOMMENDS THE CONSTRUCTION OF THE AIRPORT IN THE
    20070H1589B2829                 - 225 -    

     1     CONCLUSIONS CONTAINED IN THE FINAL REPORT OF THE COMMITTEE.
     2         (3)  THAT NO OTHER FUNDS DERIVED BY THE COMMONWEALTH OR A
     3     POLITICAL SUBDIVISION UNDER 4 PA.C.S. (RELATING TO
     4     AMUSEMENTS) SHALL BE UTILIZED FOR THE PROJECT.
     5         (4)  NO MONEY ALLOCATED TO THE PROJECT DESCRIBED IN
     6     SECTIONS 5(C)(4)(I)(A) AND 6(40)(VI)(A) SHALL BE APPROVED FOR
     7     RELEASE UNTIL THE DEPARTMENT OF COMMUNITY AND ECONOMIC
     8     DEVELOPMENT CERTIFIES THAT THE PROJECT HAS AT LEAST A 50%
     9     NONPUBLIC, PRIVATE EQUITY PARTICIPATION DOCUMENTATION AT THE
    10     TIME OF APPLICATION.
    11  SECTION 23.  DEPARTMENT OF GENERAL SERVICES AUTHORIZATION.
    12     THE DEPARTMENT OF GENERAL SERVICES IS AUTHORIZED, SUBJECT TO
    13  EXECUTIVE APPROVAL AND AUTHORIZATION, TO CONSTRUCT A TERMINAL
    14  FACILITY FOR FRESH FOOD DISTRIBUTION ITEMIZED IN SECTION
    15  3(8)(II)(B) OF ACT 40 OF 2004 BY CONTRACT AWARDED BY THE
    16  DEPARTMENT OF GENERAL SERVICES OR TO ACQUIRE A TERMINAL FACILITY
    17  FOR FRESH FOOD DISTRIBUTION WITH AN OPTION TO PURCHASE.
    18  SECTION 24.  SPECIAL CONTRACT PROVISIONS FOR REDEVELOPMENT
    19                 ASSISTANCE CAPITAL PROJECTS.
    20     ANY REDEVELOPMENT ASSISTANCE CAPITAL PROGRAM-ELIGIBLE
    21  EXPENDITURE OF FUNDS INCURRED PRIOR TO JUNE 22, 2004, WHICH IS
    22  DIRECTLY RELATED TO THE REDEVELOPMENT ASSISTANCE PROJECT
    23  ITEMIZED IN SECTION 6(23)(V)(A) OF THE ACT OF JUNE 22, 2004
    24  (P.L.257, NO.40), KNOWN AS THE CAPITAL BUDGET PROJECT
    25  ITEMIZATION ACT OF 2003-2004, SHALL BE CONSIDERED ELIGIBLE TO BE
    26  UTILIZED AS A PORTION OF THE EXPENDITURE OF MATCHING FUNDS AND
    27  SHALL BE CONSIDERED AS ELIGIBLE FOR REIMBURSEMENT FROM A
    28  REDEVELOPMENT ASSISTANCE CAPITAL GRANT MADE PURSUANT TO THE
    29  ITEMIZATION IN SECTION 6(23)(V)(A) OF THE CAPITAL BUDGET PROJECT
    30  ITEMIZATION ACT OF 2003-2004.
    20070H1589B2829                 - 226 -    

     1  Section 21 25.  Editorial changes.                                <--
     2     In editing and preparing this act for printing following the
     3  final enactment, the Legislative Reference Bureau shall insert
     4  or revise letters or numbers for projects where the letters or
     5  numbers are missing or require revision. The bureau shall also
     6  revise the total monetary amounts for the total authorization,
     7  debt authorization, appropriations and departmental totals as
     8  necessary to agree with the total monetary amounts of the
     9  projects.
    10  Section 22 26.  Effective date.                                   <--
    11     This act shall take effect July 1, 2007, or immediately,
    12  whichever is later.












    D9L72RZ/20070H1589B2829         - 227 -