SENATE AMENDED PRIOR PRINTER'S NOS. 1970, 2107, 2151, PRINTER'S NO. 3496 2181, 2829, 2932
No. 1589 Session of 2007
INTRODUCED BY D. EVANS, JUNE 18, 2007
SENATOR ARMSTRONG, APPROPRIATIONS, IN SENATE, RE-REPORTED AS AMENDED, MARCH 31, 2008
AN ACT 1 Providing for the capital budget for the fiscal year 2007-2008; 2 itemizing public improvement projects, furniture and 3 equipment projects, transportation assistance projects, 4 redevelopment assistance capital projects, flood control 5 projects, Keystone Recreation, Park and Conservation Fund 6 projects, Environmental Stewardship Fund projects, Motor 7 License Fund projects, State forestry bridge projects, 8 PENNSYLVANIA FISH AND BOAT COMMISSION PROJECTS, Manufacturing <-- 9 Fund Projects and federally funded projects to be constructed 10 or acquired or assisted by the Department of General 11 Services, the Department of Community and Economic 12 Development, the Department of Conservation and Natural 13 Resources, the Department of Environmental Protection, THE <-- 14 PENNSYLVANIA FISH AND BOAT COMMISSION and the Department of 15 Transportation, together with their estimated financial 16 costs; authorizing the incurring of debt without the approval 17 of the electors for the purpose of financing the projects to 18 be constructed, acquired or assisted by the Department of 19 General Services, the Department of Community and Economic 20 Development, the Department of Conservation and Natural 21 Resources, the Department of Environmental Protection, THE <-- 22 PENNSYLVANIA FISH AND BOAT COMMISSION or the Department of 23 Transportation; stating the estimated useful life of the 24 projects; providing an exemption; providing for limitation on 25 certain capital projects, for special provisions for certain 26 redevelopment assistance capital projects and for preemption 27 of local ordinances for Department of Corrections projects; 28 and making appropriations. 29 The General Assembly of the Commonwealth of Pennsylvania
1 hereby enacts as follows: 2 Section 1. Short title. 3 This act shall be known and may be cited as the Capital 4 Budget Project Itemization Act of 2007-2008. 5 Section 2. Total authorizations. 6 (a) Public improvements.--The total authorization for the 7 additional capital projects in the category of public 8 improvement projects itemized in section 3 and to be acquired or 9 constructed by the Department of General Services, its 10 successors or assigns and to be financed by the incurring of 11 debt shall be $1,548,730,000 $3,723,177,000 $4,479,227,000 <-- 12 $5,120,432,000. <-- 13 (b) Furniture and equipment.--The total authorization for 14 the additional capital projects in the category of public 15 improvement projects consisting of the acquisition of original 16 movable furniture and equipment to complete public improvement 17 projects itemized in section 4 and to be acquired by the 18 Department of General Services, its successors or assigns and to 19 be financed by the incurring of debt shall be $81,846,000 <-- 20 $136,346,000 $149,846,000 $166,346,000. <-- 21 (c) Transportation assistance.--The total authorization for 22 the capital projects in the category of transportation 23 assistance projects itemized in section 5 with respect to which 24 an interest is to be acquired in or constructed by the 25 Department of Transportation, its successors or assigns and to 26 be financed by the incurring of debt shall be $428,978,000 <-- 27 $671,739,000 $695,639,000 $750,939,000. <-- 28 (d) Redevelopment assistance.--The total authorization for 29 the additional capital projects in the category of redevelopment <-- 30 assistance and redevelopment assistance capital projects 20070H1589B3496 - 2 -
1 itemized in section 6 for capital grants by the Department of 2 Community and Economic Development, its successors or assigns 3 and to be financed by the incurring of debt shall be 4 $1,847,616,000 $4,497,578,000 $4,852,177,000 $6,482,798,000. <-- 5 (e) Flood control.--The total authorization for the capital 6 projects in the category of flood control projects itemized in 7 section 7 and to be constructed by the Department of 8 Environmental Protection, its successors or assigns, and to be 9 financed by the incurring of debt, shall be $21,726,000 <-- 10 $39,226,000 $74,526,000. <-- 11 (f) Keystone Recreation, Park and Conservation Fund.--The 12 total authorization for the capital projects in the category of 13 public improvement projects itemized in section 8 and to be 14 constructed by the Department of Conservation and Natural 15 Resources, its successors or assigns and to be financed from 16 current revenues in the Keystone Recreation, Park and 17 Conservation Fund shall be $28,613,000. 18 (g) Environmental Stewardship Fund projects.--The total 19 authorization for the capital projects in the category of public 20 improvement projects itemized in section 9 and to be constructed 21 by the Department of Conservation and Natural Resources, its 22 successors or assigns and to be financed from current revenues 23 in the Environmental Stewardship Fund shall be $142,255,000 <-- 24 $143,655,000. <-- 25 (h) State forestry bridge projects.--The total authorization 26 for the capital projects itemized in section 10 to be 27 constructed by the Department of Conservation and Natural 28 Resources, its successors or assigns and to be financed by oil 29 company franchise tax revenues pursuant to 75 Pa.C.S. § 30 9502(a)(2)(iv) (relating to imposition of tax) shall be 20070H1589B3496 - 3 -
1 $8,300,000. 2 (i) General Fund current revenue projects.--The total 3 authorization for the capital projects in the category of public 4 improvement projects itemized in section 11 and to be developed 5 or constructed by the Department of General Services, its 6 successors or assigns and to be financed from current revenues 7 in the General Fund shall be $26,100,000 $29,600,000 $32,600,000 <-- 8 $29,600,000. <-- 9 (J) MANUFACTURING FUND CURRENT REVENUE PROJECTS.--THE TOTAL <-- 10 AUTHORIZATION FOR THE CAPITAL PROJECTS IN THE CATEGORY OF PUBLIC 11 IMPROVEMENT PROJECTS ITEMIZED IN SECTION 11.1 AND TO BE 12 CONSTRUCTED BY THE DEPARTMENT OF GENERAL SERVICES, ITS 13 SUCCESSORS OR ASSIGNS, AND TO BE FINANCED FROM CURRENT REVENUES 14 IN THE MANUFACTURING FUND SHALL BE $3,000,000. 15 (K) FISH AND BOAT FUND PROJECTS.--THE TOTAL AUTHORIZATION <-- 16 FOR THE CAPITAL PROJECTS IN THE CATEGORY OF PUBLIC IMPROVEMENT 17 PROJECTS ITEMIZED IN SECTION 11.2 TO BE ACQUIRED OR DEVELOPED BY 18 THE PENNSYLVANIA FISH AND BOAT COMMISSION AND TO BE FINANCED BY 19 THE INCURRING OF DEBT OR BY CURRENT REVENUES OF THE FISH FUND 20 AND THE BOAT FUND PURSUANT TO EXECUTIVE AUTHORIZATION SHALL BE 21 $9,000,000 $30,600,000 $79,100,000. <-- 22 (j) (K) Manufacturing Fund current revenue projects.--The <-- 23 total authorization for the capital projects in the category of 24 public improvement projects itemized in section 12 and to be 25 constructed by the Department of General Services, its 26 successors or assigns, and to be financed from current revenues 27 in the Manufacturing Fund shall be $3,000,000. 28 (L) MOTOR LICENSE FUND PROJECTS.--THE TOTAL AUTHORIZATION <-- 29 FOR THE CAPITAL PROJECTS IN THE CATEGORY OF PUBLIC IMPROVEMENT 30 PROJECTS ITEMIZED IN SECTION 11.3 AND TO BE DEVELOPED BY THE 20070H1589B3496 - 4 -
1 DEPARTMENT OF GENERAL SERVICES, ITS SUCCESSORS OR ASSIGNS, FOR 2 THE DEPARTMENT OF TRANSPORTATION, AND TO BE FINANCED BY THE 3 INCURRING OF DEBT OR FROM CURRENT REVENUES IN THE MOTOR LICENSE 4 FUND IS $24,144,000. 5 Section 3. Itemization of public improvement capital projects. 6 Additional capital projects in the category of public 7 improvement projects to be constructed or acquired by the 8 Department of General Services, its successors or assigns, and 9 to be financed by the incurring of debt, are hereby itemized, 10 together with their respective estimated financial costs, as 11 follows: 12 Total 13 Project 14 Project Allocation 15 (1) Office of Administration 16 (i) Statewide mobile radio and microwave 17 system 18 (A) Additional funds for DGS project 950- 19 10, Statewide mobile radio and 20 microwave system 36,100,000 21 (Base Project Allocation - $36,100,000) 22 (II) COMMONWEALTH TECHNOLOGY CENTER <-- 23 (A) ADDITIONAL FUNDS FOR DGS PROJECT 920-1 24 SECURITY AND AVAILABILITY OF 25 OPERATIONS 1,000,000 26 (BASE PROJECT ALLOCATION - $1,000,000) 27 (2) Department of Agriculture 28 (i) Health Diagnostic Laboratory 29 (A) Construct a new Pennsylvania Animal 30 Health Diagnostic Laboratory (PADLS) 20070H1589B3496 - 5 -
1 with Bio-Safety Level-3 capabilities to 2 support PADLS 33,000,000 3 (Base Project Allocation - $29,700,000) 4 (Design and Contingencies - $3,300,000) 5 (ii) State Dairy Farm 6 (A) Rehabilitate and construct several 7 support facilities for State dairy farm 8 to complement existing dairy operation 500,000 9 (Base Project Allocation - $450,000) 10 (Design and Contingencies - $50,000) 11 (iii) Pennsylvania Fairs 12 (A) Pennsylvania Fairs matching funds 5,000,000 13 (Base Project Allocation - $5,000,000) 14 (IV) DEPARTMENT HEADQUARTERS <-- 15 (A) SUPPLEMENTAL FUNDING TO PROJECT NO. 16 700.43 TO COMPLETE UPGRADES, REPAIRS 17 AND RENOVATIONS TO ORIGINAL ELECTRICAL, 18 ROOFING AND MECHANICAL SYSTEMS 5,000,000 19 (V) STATE FARM ENHANCEMENT 20 (A) CONSTRUCTION AND RENOVATION OF STATE 21 FARM SITE IN BERKS COUNTY 5,000,000 22 (B) CONSTRUCTION AND RENOVATION OF STATE 23 FARM SITE IN SNYDER COUNTY 5,000,000 24 (VI) FARM SHOW COMPLEX 25 (A) AMENDING THE DESCRIPTION OF PROJECT 26 NO. 700.41, PHASE III, ACT 1999-35 2,000,000 27 (3) Department of Conservation and Natural 28 Resources 29 (i) Bald Eagle State Park 30 (A) Rehabilitate and develop a family 20070H1589B3496 - 6 -
1 campground at the State park including 2 infrastructure 2,000,000 3 (Base Project Allocation - $2,000,000) 4 (ii) Chester County 5 (A) Acquire the Strawbridge Property lands 6 in Chester County 4,000,000 7 (Land Allocation - $4,000,000) 8 (iii) Clear Creek State Park 9 (A) Construct new maintenance facility 10 including infrastructure 1,800,000 11 (Base Project Allocation - $1,800,000) 12 (iv) Cook Forest State Park 13 (A) Replace the office/visitors' center 2,500,000 14 (Base Project Allocation - $2,000,000) 15 (Design and Contingencies - $500,000) 16 (B) Replace the pit latrines with modern 17 flush facilities including 18 infrastructure 1,000,000 19 (Base Project Allocation - $800,000) 20 (Design and Contingencies - $200,000) 21 (v) Erie Bluffs State Park 22 (A) Provide for construction of the 23 initial development of 540 acre area 24 including infrastructure, roads, 25 trails, parking lots and boating 26 facilities 10,000,000 27 (Base Project Allocation - $8,000,000) 28 (Design and Contingencies - $2,000,000) 29 (vi) Forest District 3 30 (A) Rehabilitate and improve the Gunter 20070H1589B3496 - 7 -
1 Valley Dam to return it to a safe 2 condition and in compliance with 3 current requirements 7,000,000 4 (Base Project Allocation - $5,600,000) 5 (Design and Contingencies - $1,400,000) 6 (vii) Forest District 4 7 (A) Repair and repave roads including 8 returning a portion back to a gravel 9 road 5,000,000 10 (Base Project Allocation - $4,000,000) 11 (Design and Contingencies - $1,000,000) 12 (viii) Forest District 7 13 (A) Rehabilitate roadways throughout the 14 forest to ensure safety and to provide 15 public access for outdoor activities 3,000,000 16 (Base Project Allocation - $2,400,000) 17 (Design and Contingencies - $600,000) 18 (ix) Forest District 9 19 (A) Rehabilitate roadways throughout the 20 forest to ensure safety and to provide 21 public access for outdoor activities 3,000,000 22 (Base Project Allocation - $2,400,000) 23 (Design and Contingencies - $600,000) 24 (x) Forest District 10 25 (A) Rehabilitate roadways throughout the 26 forest to ensure safety and to provide 27 public access for outdoor activities 3,000,000 28 (Base Project Allocation - $2,400,000) 29 (Design and Contingencies - $600,000) 30 (xi) Forest District 12 20070H1589B3496 - 8 -
1 (A) Rehabilitate roadways throughout the 2 forest to ensure safety and to provide 3 public access for outdoor activities 3,000,000 4 (Base Project Allocation - $2,400,000) 5 (Design and Contingencies - $600,000) 6 (xii) Forest District 13 7 (A) Rehabilitate roadways throughout the 8 forest to ensure safety and to provide 9 public access for outdoor activities 3,000,000 10 (Base Project Allocation - $2,400,000) 11 (Design and Contingencies - $600,000) 12 (xiii) Forest District 15 13 (A) Rehabilitate roadways throughout the 14 forest to ensure safety and to provide 15 public access for outdoor activities 3,000,000 16 (Base Project Allocation - $2,400,000) 17 (Design and Contingencies - $600,000) 18 (xiv) Forest District 16 19 (A) Rehabilitate roadways throughout the 20 forest to ensure safety and to provide 21 public access for outdoor activities 3,000,000 22 (Base Project Allocation - $2,400,000) 23 (Design and Contingencies - $600,000) 24 (xv) Forest District 20 25 (A) Rehabilitate roadways throughout the 26 forest to ensure safety and to provide 27 public access for outdoor activities 3,000,000 28 (Base Project Allocation - $2,400,000) 29 (Design and Contingencies - $600,000) 30 (B) Rehabilitate rest facilities, parking 20070H1589B3496 - 9 -
1 lots and multiple use trails and
2 refurbish living quarters as a
3 departmental training facility with
4 necessary equipment 2,500,000
5 (Base Project Allocation - $2,000,000)
6 (Design and Contingencies - $500,000)
7 (xvi) Gouldsboro State Park
8 (A) Rehabilitate day use area and provide
9 for the replacement of lifeguard
10 building, bathhouse, boat rental
11 building and comfort station including
12 infrastructure 2,500,000
13 (Base Project Allocation - $2,000,000)
14 (Design and Contingencies - $500,000)
15 (XVI.1) KINZUA BRIDGE STATE PARK <--
16 (A) RECONSTRUCTION OF THE KINZUA VIADUCT 42,000,000
17 (XVI.2) LANCASTER COUNTY <--
18 (A) DEVELOPMENT OF A RAILS-TO-TRAILS
19 PROJECT IN CONJUNCTION WITH THE
20 LANCASTER COUNTY PLANNING COMMISSION,
21 MANOR, CONESTOGA, MARTIC, PROVIDENCE,
22 EDEN, BART AND SADBURY TOWNSHIPS,
23 QUARRYVILLE BOROUGH AND THE LANCASTER
24 COUNTY CONSERVANCY 9,000,000
25 (XVI.2) (XVI.3) LAUREL MOUNTAIN STATE PARK <--
26 (A) RESTORATION AND REHABILITATION OF
27 PARK 5,000,000
28 (BASE PROJECT ALLOCATION - $5,000,000)
29 (B) INFRASTRUCTURE, CONSTRUCTION AND OTHER
30 RELATED COSTS FOR THE RENOVATION AND
20070H1589B3496 - 10 -
1 REHABILITATION OF THE LAUREL MOUNTAIN 2 SKI RESORT FACILITIES 1,500,000 3 (xvii) Lehigh Gorge State Park 4 (A) Provide for the acquisition of land 5 necessary to complete the scheme for 6 the park in conformance with Statewide 7 recreation plan 3,500,000 8 (Land Allocation - $3,500,000) 9 (XVII.1) MARSH CREEK STATE PARK <-- 10 (A) ACQUISITION, DEMOLITION AND 11 DEVELOPMENT OF THE DORLANS MILL/SHRYOCK 12 PROPERTY 5,000,000 13 (BASE PROJECT ALLOCATION - $2,500,000) 14 (LAND ALLOCATION - $2,000,000) 15 (DESIGN AND CONTINGENCIES - $500,000) 16 (xviii) Montgomery County 17 (A) Acquire the Erdenheim Farm lands in 18 Montgomery County 4,000,000 19 (Land Allocation -$4,000,000) 20 (XVIII.1) MONTGOMERY COUNTY AND PHILADELPHIA <-- 21 COUNTY 22 (B) (A) ENGINEERING AND CONSTRUCTION OF <-- 23 CRESHEIM TRAIL BETWEEN VALLEY GREEN IN 24 FAIRMONT FAIRMOUNT Park in Philadelphia <-- 25 and Fort Washington State Park 2,500,000 26 (xix) Nescopeck State Park 27 (A) Develop day use area and provide for 28 the development of recreational and 29 educational facilities for day use 3,000,000 30 (Base Project Allocation - $2,500,000) 20070H1589B3496 - 11 -
1 (Design and Contingencies - $500,000)
2 (XX) PRESQUE ISLE STATE PARK <--
3 (A) PROVIDE FOR THE REPLENISHMENT OF SAND
4 FOR THE PARK'S BEACHES 2,100,000
5 (xx) (XX.1) Promised Land State Park <--
6 (A) Rehabilitate and improve lower lake
7 dam to return it to a safe condition
8 and in compliance with current
9 requirements 3,500,000
10 (Base Project Allocation - $2,800,000)
11 (Design and Contingencies - $700,000)
12 (B) Rehabilitation to infrastructure 139,000
13 (Base Project Allocation - $139,000)
14 (xxi) Quehanna Wild Area
15 (A) Provide for the remediation of land of
16 radioactive materials within the
17 Quehanna wild area at the former
18 nuclear reactor site 2,500,000
19 (Base Project Allocation - $2,500,000)
20 (B) Facilitate the cleanup and reclamation
21 of the Quehanna reactor site at
22 Moshannon State Forest 1,834,000
23 (Base Project Allocation - $1,834,000)
24 (xxii) Ricketts Glen State Park
25 (A) Repair and repave roads including
26 returning a portion back to a gravel
27 road 3,500,000
28 (Base Project Allocation - $2,800,000)
29 (Design and Contingencies - $700,000)
30 (xxiii) S.B. Elliott State Park
20070H1589B3496 - 12 -
1 (A) Additional funding to complete the 2 visitors' center and overnight lodging 3 including furnishings and equipment 3,500,000 4 (Base Project Allocation - $3,500,000) 5 (xxiv) Shikellamy State Park 6 (A) Rehabilitate marina damaged by flood 7 waters in 2005 and 2006 including new 8 docks, railings, concrete bulkheads and 9 courtesy docks 1,500,000 10 (Base Project Allocation - $1,200,000) 11 (Design and Contingencies - $300,000) 12 (4) Department of Corrections 13 (i) State Correctional Institution at 14 Cambridge Springs 15 (A) Construct a new 128-cell L-3 close 16 security housing unit with 230-bed 17 capacity with infrastructure upgrade 16,800,000 <-- 18 (Base Project Allocation - $13,500,000) 19 (Design and Contingencies - $3,300,000) 20 CAPACITY WITH INFRASTRUCTURE UPGRADE 17,800,000 <-- 21 (BASE PROJECT ALLOCATION - $14,800,000) 22 (DESIGN AND CONTINGENCIES - $3,000,000) 23 (ii) State Correctional Institution at Camp 24 Hill 25 (A) Additional funds for DGS project 573- 26 26, replacement of Group 1 plumbing 27 components 8,000,000 28 (Base Project Allocation - $6,400,000) 29 (Design and Contingencies - $1,600,000) 30 (B) Additional funds for DGS project 573- 20070H1589B3496 - 13 -
1 27, provide additional funding for 2 Phase 2 to complete the plumbing 3 repairs started under projects 573-27 4 to include steam pipe replacement and 5 repairs to pipe tunnels 6,000,000 6 (Base Project Allocation - $4,800,000) 7 (Design and Contingencies - $1,200,000) 8 (iii) State Correctional Institution at Coal 9 Township 10 (A) Construct a new 128-cell L-3 close 11 security housing unit with 230-bed 12 capacity with infrastructure upgrade 14,500,000 <-- 13 (Base Project Allocation - $11,600,000) 14 (Design and Contingencies - $2,900,000) 15 CAPACITY WITH INFRASTRUCTURE UPGRADE 15,500,000 <-- 16 (BASE PROJECT ALLOCATION - $12,900,000) 17 (DESIGN AND CONTINGENCIES - $2,600,000) 18 (iv) State Correctional Institution at Cresson 19 (A) Renovate and upgrade the heating and 20 air conditioning system serving the 21 medical building 550,000 22 (Base Project Allocation - $440,000) 23 (Design and Contingencies - $110,000) 24 (v) (Reserved) <-- 25 (V) STATE CORRECTIONAL INSTITUTION AT FAYETTE <-- 26 (A) REPLACE HEATING AND COOLING 27 DISTRIBUTION LINES 10,500,000 28 (BASE PROJECT ALLOCATION - $8,750,000) 29 (DESIGN AND CONTINGENCIES - $1,750,000) 30 (vi) State Correctional Institution at Forest 20070H1589B3496 - 14 -
1 (A) Construct a new 128-cell L-5 close 2 security housing unit with capacity 3 with infrastructure upgrade 16,500,000 <-- 4 (Base Project Allocation - $13,200,000) 5 (Design and Contingencies - $3,300,000) 6 WITH INFRASTRUCTURE UPGRADE 17,500,000 <-- 7 (BASE PROJECT ALLOCATION - $14,600,000) 8 (DESIGN AND CONTINGENCIES - $2,900,000) 9 (vii) State Correctional Institution at 10 Frackville 11 (A) Replace and upgrade the institution's 12 main electrical switchgear 520,000 13 (Base Project Allocation - $416,000) 14 (Design and Contingencies - $104,000) 15 (B) CONSTRUCT A NEW 2,000-BED L-3 MEDIUM <-- 16 SECURITY PRISON ON THE GROUNDS OF SCI 17 FRACKVILLE, INCLUDING INFRASTRUCTURE 18 AND ROAD WORK TO INCORPORATE THE TWO 19 FACILITIES AT THIS SITE 200,000,000 20 (BASE PROJECT ALLOCATION - 21 $160,000,000) 22 (DESIGN AND CONTINGENCIES - 23 $40,000,000) 24 (viii) State Correctional Institution at 25 Graterford 26 (A) Construct a new 2,000 bed L-3 Medium 27 Security prison on the grounds of SCI 28 Graterford including infrastructure and 29 road work to incorporate the two 30 facilities at this site 200,000,000 20070H1589B3496 - 15 -
1 (Base Project Allocation - 2 $160,000,000) 3 (Design and Contingencies - 4 $40,000,000) 5 (B) CONSTRUCT NEW ROADWAY TO ACCESS SCI <-- 6 GRATERFORD OFF ROUTE 73 695,000 7 (BASE PROJECT ALLOCATION - $556,000) 8 (DESIGN AND CONTINGENCIES - $139,000) 9 (ix) State Correctional Institution at 10 Huntingdon 11 (A) Construct a new 2,000 bed L-3 Medium <-- 12 L-5 MAXIMUM Security prison on the <-- 13 grounds of SCI Huntingdon including 14 infrastructure and road work to 15 incorporate the two facilities at this 16 site 200,000,000 17 (Base Project Allocation - 18 $160,000,000) 19 (Design and Contingencies - 20 $40,000,000) 21 (x) State Correctional Institution at Laurel 22 Highlands 23 (A) Replace roofs on dietary building No.4 24 and housing unit building C 800,000 25 (Base Project Allocation - $640,000) 26 (Design and Contingencies - $160,000) 27 (B) Additional funds for DGS Project 376- 28 5, construct a new 230-bed capacity 29 facility and upgrade infrastructure and 30 security 1,500,000 <-- 20070H1589B3496 - 16 -
1 (Base Project Allocation - $1,200,000) 2 (Design and Contingencies - $300,000) 3 SECURITY 2,000,000 <-- 4 (BASE PROJECT ALLOCATION - $1,600,000) 5 (DESIGN AND CONTINGENCIES - $400,000) 6 (X.1) STATE CORRECTIONAL INSTITUTION AT 7 MAHANOY 8 (A) CONSTRUCT A NEW 2,000-BED L-3 MEDIUM 9 SECURITY PRISON ON THE GROUNDS OF SCI 10 MAHANOY, INCLUDING INFRASTRUCTURE AND 11 ROAD WORK TO INCORPORATE THE TWO 12 FACILITIES AT THIS SITE 200,000,000 13 (BASE PROJECT ALLOCATION - 14 $160,000,000) 15 (DESIGN AND CONTINGENCIES - 16 $40,000,000) 17 (xi) State Correctional Institution at Mercer 18 (A) Replace roofs on medical building, M 19 Block and G Block 650,000 20 (Base Project Allocation - $520,000) 21 (Design and Contingencies - $130,000) 22 (B) Additional funds for DGS Project 1572- <-- 23 10 1572-12, construct a new 230-bed <-- 24 capacity facility and upgrade 25 infrastructure and security 4,000,000 <-- 26 (Base Project Allocation - $3,200,000) 27 SECURITY 4,500,000 <-- 28 (BASE PROJECT ALLOCATION - $3,700,000) 29 (Design and Contingencies - $800,000) 30 (xii) State Correctional Institution at Muncy 20070H1589B3496 - 17 -
1 (A) Replace roofs on Administration 2 building, Laundry building, Storeroom 3 building, Kitchen building, and housing 4 units A Block, M Block, K Block and F 5 Block 2,300,000 6 (Base Project Allocation - $1,840,000) 7 (Design and Contingencies - $460,000) 8 (B) Additional funds for DGS Project 574- 9 26, addition of two new cell blocks for 10 close security, expansion of infirmary, 11 outside warehouse, electrical and 12 boiler upgrades; also including funds 13 for utility upgrades and kitchen and 14 dining room expansion 7,200,000 <-- 15 (Base Project Allocation - $5,800,000) 16 (Design and Contingencies - $1,400,000) 17 DINING ROOM EXPANSION 7,700,000 <-- 18 (BASE PROJECT ALLOCATION - $6,400,000) 19 (DESIGN AND CONTINGENCIES - $1,300,000) 20 (xiii) State Correctional Institution at Pine 21 Grove 22 (A) Construct a new 128-cell L-3 close 23 security housing unit with 230-bed 24 capacity with infrastructure upgrade 14,500,000 <-- 25 (Base Project Allocation - $11,600,000) 26 (Design and Contingencies - $2,900,000) 27 CAPACITY WITH INFRASTRUCTURE UPGRADE 15,500,000 <-- 28 (BASE PROJECT ALLOCATION - $12,900,000) 29 (DESIGN AND CONTINGENCIES - $2,600,000) 30 (xiv) State Correctional Institution at 20070H1589B3496 - 18 -
1 Rockview 2 (A) Construct a new 2,000 bed L-3 Medium 3 Security prison on the grounds of SCI 4 Rockview including infrastructure and 5 road work to complete the two 6 facilities at this site 200,000,000 7 (Base Project Allocation - 8 $160,000,000) 9 (Design and Contingencies - 10 $40,000,000) 11 (xv) State Correctional Institution at 12 Smithfield 13 (A) Additional funds for DGS Project 1573- 14 7, expand kitchen/dining facility 2,500,000 15 (Base Project Allocation - $2,000,000) 16 (Design and Contingencies - $500,000) 17 (B) Additional funds for DGS Project 1573- 18 9, construct a new 230-bed capacity 19 facility and upgrade infrastructure and 20 security 4,000,000 <-- 21 (Base Project Allocation - $3,200,000) 22 (Design and Contingencies - $800,000) 23 SECURITY 5,000,000 <-- 24 (BASE PROJECT ALLOCATION - $4,100,000) 25 (DESIGN AND CONTINGENCIES - $900,000) 26 (xvi) New State Correctional Institution in 27 Luzerne County 28 (A) Construct a new 2,300-bed L-3 medium 29 security prison within a five-mile 30 radius of SCI Retreat. Includes 20070H1589B3496 - 19 -
1 construction of all other facilities as 2 necessary to operate institution 200,000,000 3 (Base Project Allocation - 4 $160,000,000) 5 (Design and Contingencies - 6 $40,000,000) 7 (XVII) NEW STATE CORRECTIONAL INSTITUTION IN <-- 8 NORTHUMBERLAND COUNTY 9 (A) CONSTRUCT A NEW 2,000-BED L-3 MEDIUM 10 SECURITY PRISON, INCLUDING ACQUISITION 11 OF LAND, CONSTRUCTION OF INFRASTRUCTURE 12 AND CONSTRUCTION OF ALL OTHER 13 FACILITIES AS NECESSARY TO OPERATE THE 14 INSTITUTION 200,000,000 15 (BASE PROJECT ALLOCATION - 16 $160,000,000) 17 (DESIGN AND CONTINGENCIES - 18 $40,000,000) 19 (xvii) (XVIII) Corrections training rifle <-- 20 range and indoor hand gun range 21 (A) Construction of a corrections training 22 rifle range and indoor hand gun range 2,000,000 23 (Base Project Allocation - $2,000,000) 24 (IX) (XIX) NEW STATE CORRECTIONAL INSTITUTION <-- 25 IN FAYETTE COUNTY 26 (A) CONSTRUCT A NEW 2,300-BED 2,000-BED L- <-- 27 3 MEDIUM SECURITY PRISON, INCLUDING 28 CONSTRUCTION OF ALL OTHER FACILITIES AS 29 NECESSARY TO OPERATE INSTITUTION 200,000,000 30 (BASE PROJECT ALLOCATION - 20070H1589B3496 - 20 -
1 $160,000,000)
2 (DESIGN AND CONTINGENCIES -
3 $40,000,000)
4 (XX) NEW STATE CORRECTIONAL INSTITUTION IN <--
5 ARMSTRONG COUNTY
6 (A) CONSTRUCT A NEW 2,300 BED L-3 MEDIUM
7 SECURITY PRISON, INCLUDING CONSTRUCTION
8 OF ALL OTHER FACILITIES AS NECESSARY TO
9 OPERATE THE INSTITUTION 200,000,000
10 (BASE PROJECT ALLOCATION -
11 $160,000,000)
12 (DESIGN AND CONTINGENCIES -
13 $40,000,000)
14 (5) Department of Education
15 (I) DEPARTMENT OF EDUCATION HEADQUARTERS <--
16 (A) PROVIDE IMPROVEMENTS AND UPGRADES TO
17 RENOVATE THREE FLOORS OF THE DEPARTMENT
18 OF EDUCATION HEADQUARTERS BUILDING AT
19 333 MARKET STREET 1,750,000
20 (BASE PROJECT ALLOCATION - $1,600,000)
21 (DESIGN AND CONTINGENCIES - $150,000)
22 (i) (I.1) Scranton State School for the Deaf <--
23 (A) Provide improvements and upgrades to
24 the emergency, mechanical and
25 electrical systems throughout the
26 campus 7,560,000
27 (Base Project Allocation - $6,574,000)
28 (Design and Contingencies - $986,000)
29 (ii) Pennsylvania State University
30 (A) Provide for the capital renewal for
20070H1589B3496 - 21 -
1 campuses in the eastern region of the 2 university including code compliances 3 and infrastructure upgrades 7,000,000 4 (Base Project Allocation - $7,000,000) 5 (B) Provide for the capital renewal for 6 campuses in the central region of the 7 university including code compliances 8 and infrastructure upgrades 7,000,000 9 (Base Project Allocation - $7,000,000) 10 (C) Provide for the capital renewal for 11 campuses in the western region of the 12 university including code compliances 13 and infrastructure upgrades 7,000,000 14 (Base Project Allocation - $7,000,000) 15 (D) ALTOONA CAMPUS, ENGINEERING AND <-- 16 RESEARCH AND EXTENSION BUILDING 30,000,000 17 (E) DUBOIS CAMPUS, ENGINEERING RESEARCH 18 AND EXTENSION BUILDING 30,000,000 19 (F) UNIVERSITY PARK, ENGINEERING 20 ADMINISTRATION, RESEARCH AND EXTENSION 21 BUILDING 80,000,000 22 (G) CAPITAL RENEWAL, PHASE II, EASTERN 23 REGION 14,000,000 24 (H) CAPITAL RENEWAL, PHASE II, CENTRAL 25 REGION 14,000,000 26 (I) CAPITAL RENEWAL, PHASE II, WESTERN 27 REGION 14,000,000 28 (J) CAPITAL RENEWAL, PHASE IV AT 29 UNIVERSITY PARK 40,000,000 30 (K) RENOVATION, REHABILITATION AND 20070H1589B3496 - 22 -
1 CONSTRUCTION COSTS FOR A CHEMICAL 2 ENGINEERING BUILDING 51,700,000 3 (L) ENGINEERING RESEARCH AND EXTENSION <-- 4 FACILITY IN PHILADELPHIA 30,000,000 5 (M) CONSTRUCTION OF APPLIED RESEARCH LAB <-- 6 BUILDING IN INNOVATION PARK, INCLUDING 7 SITE, UTILITY, PARKING, LANDSCAPING, 8 SIGNAGE AND OTHER RELATED COSTS 50,000,000 9 (N) EBERLY CAMPUS, FAYETTE, CONSTRUCTION 10 OF ANNEX TO COMMUNITY CENTER 1,500,000 11 (O) EBERLY CAMPUS, FAYETTE, CONSTRUCTION 12 OF ANNEX TO LIBRARY 1,750,000 13 (P) EBERLY CAMPUS, FAYETTE, CONSTRUCTION 14 OF BASEBALL/SOFTBALL COMPLEX 1,500,000 15 (Q) EBERLY CAMPUS, FAYETTE, RENOVATIONS TO 16 THE CENTER FOR COMMUNITY AND PUBLIC 17 SAFETY OFFICE 800,000 18 (R) EBERLY CAMPUS, FAYETTE, CONSTRUCTION 19 OF RESIDENCE HALL 20,000,000 20 (iii) University of Pennsylvania 21 (A) Construction of a Center for 22 Nanotechnology Research and 23 Development 30,000,000 24 (Base Project Allocation - $30,000,000) 25 (B) Construction of a new Life Sciences 26 Building 16,000,000 27 (Base Project Allocation - $16,000,000) 28 (iv) University of Pittsburgh 29 (A) Providing for upgrades and deferred 30 maintenance needs on all campuses 20,000,000 20070H1589B3496 - 23 -
1 (Base Project Allocation - $16,667,000) 2 (Design and Contingencies - $3,333,000) 3 (B) Construction and other related costs 4 for the renovation of the Manufacturing 5 Assistance Center 375,000 6 (C) ADDITIONAL FUNDS FOR DGS PROJECT NO. <-- 7 1103-385, CONSTRUCTION OF SALK HALL 8 ADDITION 30,000,000 9 (D) RENOVATIONS AND ADDITION TO CHEVRON 10 SCIENCE CENTER 25,000,000 11 (E) PROGRAMMATIC RENOVATIONS, PHASE II, 12 ALL CAMPUSES 20,000,000 13 (v) Lincoln University 14 (A) Renovate Langston Hughes Library and <-- 15 correct problems from structural design 16 flaws 7,000,000 17 (Base Project Allocation - $5,600,000) 18 (Design and Contingencies - $1,400,000) 19 (B) Renovate Wright Hall building systems, 20 classrooms and laboratory including ADA 21 requirements 4,000,000 22 (Base Project Allocation - $3,200,000) 23 (Design and Contingencies - $800,000) 24 (A) ADDITIONAL FUNDS TO RENOVATE LANGSTON <-- 25 HUGHES LIBRARY AND CORRECT PROBLEMS 26 FROM STRUCTURAL DESIGN FLAWS, 27 CONTINUATION OF DGS PROJECT NO. 1101- 28 44 7,000,000 29 (BASE PROJECT ALLOCATION - $5,600,000) 30 (DESIGN AND CONTINGENCIES - $1,400,000) 20070H1589B3496 - 24 -
1 (B) ADDITIONAL FUNDS FOR COMPLETION OF 2 RENOVATION OF WRIGHT HALL BUILDING 3 SYSTEMS, CLASSROOMS AND LABORATORY, 4 INCLUDING ADA REQUIREMENTS FOR DGS 5 PROJECT NO. 1101-43 4,000,000 6 (BASE PROJECT ALLOCATION - $3,200,000) 7 (DESIGN AND CONTINGENCIES - $800,000) 8 (C) ADDITIONAL FUNDS FOR LANDSCAPING, 9 SIDEWALKS AND OTHER PROJECTS, PHASE II, 10 DGS PROJECT NO. 1101-45 15,000,000 11 (D) ADDITIONAL FUNDS FOR DGS PROJECT NO. 12 1101-28A AND EMERGENCY GENERATORS 1,800,000 13 (V.1) LEHIGH CARBON COMMUNITY COLLEGE 14 (A) CONSTRUCTION OF FOUR ATHLETIC FIELDS 2,200,000 15 (B) ACQUISITION, CONSTRUCTION, <-- 16 INFRASTRUCTURE AND OTHER RELATED COSTS 17 FOR STUDENT HOUSING, AT THE MORGAN 18 CENTER, TAMAQUA CAMPUS 7,000,000 19 (BASE PROJECT ALLOCATION - $5,000,000) 20 (DESIGN AND CONTINGENCIES - $2,000,000) 21 (V.2) COMMUNITY COLLEGE OF ALLEGHENY COUNTY 22 (A) CONSTRUCTION OF SCIENCE CENTER 14,500,000 23 (vi) Luzerne County Community College 24 (A) Construction, infrastructure and other 25 related costs for a public safety 26 institute 1,000,000 27 (B) Acquisition, construction, 28 infrastructure and other related costs 29 for student housing 2,000,000 30 (C) Acquisition, construction, 20070H1589B3496 - 25 -
1 infrastructure and other related costs 2 for a new culinary arts building with 3 parking 3,000,000 4 (D) CONSTRUCTION AND RELATED COSTS FOR THE <-- 5 KANJORSKI BUILDING HEALTH SCIENCES 6 CENTER AT LUZERNE COMMUNITY COLLEGE 2,352,000 7 (vii) Northampton Community College 8 (A) Monroe Campus, construction of new 9 campus to increase the availability of 10 academic square footage 44,000,000 11 (Base Project Allocation - $44,000,000) 12 (B) NORTHAMPTON CAMPUS, RENOVATIONS AND <-- 13 INFRASTRUCTURE IMPROVEMENTS TO THE 14 BOILER AND COOLING TOWERS 500,000 15 (C) NORTHAMPTON CAMPUS, RENOVATIONS AND 16 EXPANSION OF THE AUTOMOTIVE TECHNOLOGY 17 PROGRAM FACILITY 1,000,000 18 (D) FOWLER FAMILY SOUTHSIDE CENTER 19 RENOVATIONS 1,000,000 20 (viii) Montgomery County Community College 21 (A) Construction, infrastructure and other 22 related costs to expand the Science 23 Center 750,000 24 (Base Project Allocation - $750,000) 25 (B) ROOF REPLACEMENT ON 101 COLLEGE DRIVE <-- 26 BUILDING 500,000 27 (C) EXTERIOR DOOR REPLACEMENTS ON CENTRAL 28 CAMPUS FACILITIES 135,000 29 (D) CONSTRUCTION OF A WALKWAY AROUND THE 30 PERIMETER OF CENTRAL CAMPUS 323,000 20070H1589B3496 - 26 -
1 (E) RENOVATIONS AND OTHER RELATED COSTS 2 FOR THE RELOCATION AND EXPANSION OF THE 3 THEATER FACILITY 400,000 4 (VIII.1) COMMUNITY COLLEGE OF PHILADELPHIA 5 (A) CONSTRUCTION AND EXPANSION OF THE 6 NORTHEAST PHILADELPHIA REGIONAL CENTER 10,100,000 7 (VIII.2) PENNSYLVANIA HIGHLANDS COMMUNITY <-- 8 COLLEGE 9 (A) CONSTRUCTION OF WORKFORCE DEVELOPMENT 10 CENTER 500,000 11 (VIII.2) (VIII.3) READING AREA COMMUNITY <-- 12 COLLEGE 13 (A) INFRASTRUCTURE IMPROVEMENTS AND 14 CONSTRUCTION OF READING AREA COMMUNITY 15 COLLEGE ACADEMIC CLASSROOM 16 INSTRUCTIONAL CENTER 20,000,000 17 (VIII.3) (VIII.4) TEMPLE UNIVERSITY <-- 18 (A) DESIGN AND CONSTRUCTION OF A RESEARCH, 19 LABORATORY AND OFFICE BUILDING 100,000,000 20 (ix) Thaddeus Stevens College of Technology 21 (A) Construction and other related costs 22 for the Thaddeus Stevens Technology 23 Center 4,000,000 24 (x) Westmoreland Community College <-- 25 (A) Construction and other related costs 26 for Alle-Kiski Education Center 2,500,000 27 (B) INFRASTRUCTURE, CONSTRUCTION AND OTHER <-- 28 (X) WESTMORELAND COUNTY COMMUNITY COLLEGE <-- 29 (A) CONSTRUCTION AND OTHER RELATED COSTS 30 FOR THE NEW KENSINGTON EDUCATION 20070H1589B3496 - 27 -
1 CENTER 2,500,000 2 (B) ACQUISITION, INFRASTRUCTURE, 3 CONSTRUCTION AND OTHER RELATED COSTS 4 FOR THE CONSTRUCTION OF A WORKFORCE AND 5 ECONOMIC DEVELOPMENT TRAINING CENTER, 6 LOCATED IN NEW KENSINGTON 3,700,000 7 (C) INFRASTRUCTURE, CONSTRUCTION AND OTHER 8 RELATED COSTS FOR THE CONSTRUCTION OF A 9 WORKFORCE AND ECONOMIC DEVELOPMENT 10 TRAINING CENTER, LOCATED IN YOUNGWOOD 3,700,000 11 (D) INFRASTRUCTURE, CONSTRUCTION AND OTHER 12 COSTS RELATED TO THE EXPANSION OF THE 13 PUBLIC SAFETY TRAINING CENTER 3,750,000 14 (xi) York Community College 15 (A) Acquisition, construction, 16 infrastructure and other related costs 17 for downtown York Community College 18 campus 7,000,000 19 (XII) BUCKS COUNTY COMMUNITY COLLEGE <-- 20 (A) RENOVATIONS AND ADA ACCESSIBILITY 21 IMPROVEMENTS TO A GYMNASIUM 1,000,000 22 (B) RENOVATIONS AND UPGRADES TO THE 23 ROLLINS STUDENT CENTER 1,351,000 24 (C) CONSTRUCTION OF A CLASSROOM AND 25 FACULTY OFFICE BUILDING 8,000,000 26 (XIII) BUTLER COUNTY COMMUNITY COLLEGE <-- 27 (A) INFRASTRUCTURE, CONSTRUCTION AND 28 RENOVATION OF THE BECK LIBRARY AND 29 LEARNING RESOURCE CENTER 2,000,000 30 (XIV) HARRISBURG AREA COMMUNITY COLLEGE 20070H1589B3496 - 28 -
1 (A) ACQUISITION, CONSTRUCTION AND OTHER 2 RELATED COSTS FOR COMMUNITY COLLEGE 3 CAMPUS DEVELOPMENT IN YORK COUNTY 30,000,000 4 (6) Department of Environmental Protection 5 (I) ALLEGHENY COUNTY <-- 6 (A) WET WEATHER OVERFLOW CONTROL 7 DEMONSTRATION FACILITIES IN MILLVALE 8 AND MUNHALL BOROUGHS 5,000,000 9 (BASE PROJECT ALLOCATION - $4,000,000) 10 (DESIGN AND CONTINGENCIES - $1,000,000) 11 (B) MUNICIPAL SEWER STREAM REMOVAL 12 PROGRAMS 5,000,000 13 (BASE PROJECT ALLOCATION - $4,000,000) 14 (DESIGN AND CONTINGENCIES - $1,000,000) 15 (I) (I.1) BLAIR COUNTY <-- 16 (A) CONSTRUCTION, INFRASTRUCTURE AND OTHER 17 RELATED COSTS FOR THE MILL RUN 18 REHABILITATION PROJECT 76,000 19 (i) (II) Bucks County <-- 20 (A) Construction, infrastructure and other 21 related costs for Bristol Borough flood 22 protection project 3,000,000 23 (B) CONSTRUCTION, INFRASTRUCTURE AND OTHER <-- 24 RELATED COSTS FOR THE FLOOD CONTROL AND 25 PROTECTION PROJECT IN THE NEWPORTVILLE 26 SECTION OF BRISTOL TOWNSHIP 1,000,000 27 (ii) (III) Cambria County <-- 28 (A) Additional funds for Patton Flood <-- 29 Project to the upstream section and 30 remove existing levee in the downstream 20070H1589B3496 - 29 -
1 section 3,600,000 2 (Base Project Allocation - $3,000,000) 3 (Design and Contingencies - $600,000) 4 (A) ADDITIONAL FUNDS FOR REHABILITATION OF <-- 5 THE PATTON FLOOD PROTECTION PROJECT IN 6 THE BOROUGH OF PATTON 4,800,000 7 (BASE PROJECT ALLOCATION - $4,000,000) 8 (DESIGN AND CONTINGENCIES - $800,000) 9 (B) Construct Lancashire No.15 acid mine 10 drainage treatment plant to improve an 11 estimated 25 miles of the west branch 12 of the Susquehanna River 10,025,000 13 (Base Project Allocation - $10,025,000) 14 (IV) CHESTER COUNTY <-- 15 (A) CONSTRUCTION, INFRASTRUCTURE AND OTHER 16 RELATED COSTS FOR THE BUSINESS 30 FLOOD 17 CONTROL PROJECT 900,000 18 (iii) (V) Clearfield County <-- 19 (A) Construction and other related costs 20 for stream channel clearing and 21 restoration in Curwensville Borough 5,000,000 22 (iv) (VI) Clearfield and/or Cambria County <-- 23 (A) Construct active acid mine drainage 24 facility for currently untreated mine 25 pool discharge in the Susquehanna River 26 basin to offset agricultural 27 consumptive use demands 6,000,000 28 (Base Project Allocation - $6,000,000) 29 (v) (VII) Clearfield and Elk Counties <-- 30 (A) Construct active acid mine drainage 20070H1589B3496 - 30 -
1 facility near the Village of Hollywood,
2 Huston Township, Clearfield County, to
3 restore water quality in the Bennett
4 Branch Sinnemahoning Creek in support
5 of the PA Wilds initiative 12,125,000
6 (Base Project Allocation - $12,125,000)
7 (VIII) CLINTON COUNTY <--
8 (A) CHATHAM RUN FLOOD PROTECTION,
9 INCLUDING REPAIRS TO LEVEES ALONG
10 CHATHAM RUN THROUGH PINE CREEK IN PINE
11 CREEK TOWNSHIP 7,500,000
12 (VIII.1) COLUMBIA COUNTY
13 (A) CONSTRUCTION, INFRASTRUCTURE AND OTHER
14 RELATED COSTS FOR FISHING CREEK FLOOD
15 CONTROL PROJECT, INCLUDING GRAVEL BAR
16 REMOVAL 1,000,000
17 (VIII.2) DAUPHIN COUNTY <--
18 (A) STORMWATER CONTROL PROJECT IN LOWER
19 SWATARA TOWNSHIP 6,000,000
20 (B) STORMWATER CONTROL PROJECT IN DERRY
21 TOWNSHIP 8,000,000
22 (vi) (IX) Delaware County <--
23 (A) Construction, infrastructure and other
24 related costs for Edgemount Square in
25 Newtown Township - stormwater
26 management project 300,000
27 (B) Construction, infrastructure and other
28 related costs for the Radnor Middle
29 School stormwater management project 300,000
30 (C) Construction, infrastructure and other
20070H1589B3496 - 31 -
1 related costs for stormwater management 2 in Ridley Township 500,000 3 (vii) (X) Fulton County <-- 4 (A) Reconstruct two streams currently 5 flowing into abandoned surface mine 6 pits in order to restore the natural 7 stream flow to the Great Trough Creek 2,000,000 8 (Base Project Allocation - $2,000,000) 9 (viii) (XI) Greene County <-- 10 (A) Construction, infrastructure and other 11 related costs for Wisecarver Dam 12 rehabilitation in Franklin Township 1,500,000 13 (ix) (XII) Indiana County <-- 14 (A) Construct active acid mine drainage 15 facility near the abandoned Wehrum 16 shaft to treat discharges from two 17 abandoned mine complexes discharging to 18 Blacklick Creek 6,000,000 19 (Base Project Allocation - $6,000,000) 20 (x) (XIII) Luzerne County <-- 21 (A) Additional funds for DGS Project 184- <-- 22 23, flood control project on Mill 23 Creek, Avoca Borough 1,200,000 24 (Base Project Allocation - $1,000,000) 25 (Design and Contingencies - $200,000) 26 (B) Construction and other costs related 27 to repair and improve Wade Run in 28 Swoyersville Borough 500,000 29 (C) Construction, infrastructure and other 30 related costs for the Ashley Solomon 20070H1589B3496 - 32 -
1 Creek Tunnel Project 750,000 2 (xi) Montgomery County 3 (A) Construction and other related costs 4 for the Ardsley Drainage Project in 5 upper Dublin Township 2,000,000 6 (A) ADDITIONAL FUNDS FOR DGS PROJECT 184- <-- 7 23 MILL CREEK FLOOD PROTECTION PROJECT 8 IN AVOCA AND DUPONT BOROUGHS 6,000,000 9 (BASE PROJECT ALLOCATION - $5,000,000) 10 (DESIGN AND CONTINGENCIES - $1,000,000) 11 (B) REHABILITATION OF DGS PROJECT 180-37 12 WADE RUN STREAM IMPROVEMENT PROJECT IN 13 THE BOROUGH OF SWOYERSVILLE 1,200,000 14 (BASE PROJECT ALLOCATION - $1,000,000) 15 (DESIGN AND CONTINGENCIES - $200,000) 16 (C) CONSTRUCTION, INFRASTRUCTURE AND OTHER <-- 17 RELATED COSTS FOR ASHLEY SOLOMON CREEK 18 TUNNEL PROJECT 750,000 19 (XIV) LYCOMING COUNTY 20 (A) DESIGN, INFRASTRUCTURE AND 21 CONSTRUCTION OF COST-EFFECTIVE AND 22 AFFORDABLE FLOOD PROTECTION MEASURES 23 ALONG THE LOYALSOCK CREEK WITHIN THE 24 BOROUGH OF MONTOURSVILLE 7,500,000 25 (B) DESIGN, INFRASTRUCTURE AND 26 CONSTRUCTION OF FLOOD MITIGATION 27 PROTECTION MEASURES ALONG THE LYCOMING 28 CREEK WITHIN OLD LYCOMING, LYCOMING AND 29 LOYALSOCK TOWNSHIPS 11,000,000 30 (XV) MCKEAN COUNTY 20070H1589B3496 - 33 -
1 (A) CONSTRUCTION OF A FLOOD MITIGATION 2 PROJECT ON THE ALLEGHENY RIVER IN THE 3 BOROUGH OF PORT ALLEGANY 1,000,000 4 (XVI) MONROE COUNTY 5 (A) INFRASTRUCTURE IMPROVEMENTS AND 6 CONSTRUCTION FOR DIKE AT LAIRD 7 TECHNOLOGIES BUILDING, DELAWARE WATER 8 GAP 6,000,000 9 (B) FLOOD CONTROL PROJECT IN PARADISE <-- 10 TOWNSHIP 1,500,000 11 (XVII) MONTGOMERY COUNTY 12 (A) ADDITIONAL FUNDS FOR DGS PROJECT 181- 13 5, CONSTRUCTION AND OTHER RELATED COSTS 14 FOR ARDSLEY DRAINAGE PROJECT IN UPPER 15 DUBLIN TOWNSHIP 2,400,000 16 (BASE PROJECT ALLOCATION - $2,000,000) 17 (DESIGN AND CONTINGENCIES - $400,000) 18 (XVII.1) MONTOUR COUNTY <-- 19 (A) ADDITIONAL FUNDS FOR DGS PROJECT 181- 20 05, DANVILLE FLOOD PROTECTION PROJECT 21 PHASE II, CLOSURE STRUCTURES FOR ROUTE 22 11 AND RAILROAD BRIDGE 4,800,000 23 (XVIII) NORTHAMPTON COUNTY 24 (A) REPAIR AND RESTORATION OF SOUTH 25 BETHLEHEM FLOOD CONTROL SYSTEM 500,000 26 (XIX) NORTHUMBERLAND COUNTY 27 (A) CONSTRUCTION, INFRASTRUCTURE AND OTHER 28 RELATED COSTS FOR THE SUSQUEHANNA RIVER 29 CLEARING AND GRUBBING PROJECT 200,000 30 (B) CONSTRUCTION, INFRASTRUCTURE AND OTHER 20070H1589B3496 - 34 -
1 RELATED COSTS FOR THE REAGAN STREET
2 UNDERPASS FLOOD ABATEMENT PROJECT 2,200,000
3 (C) SHORELINE STABILIZATION FOR FLOOD <--
4 CONTROL SYSTEM IN SUNBURY BOROUGH 750,000
5 (XX) SOMERSET COUNTY
6 (A) CONSTRUCTION, INFRASTRUCTURE AND OTHER
7 RELATED COSTS FOR THE EAST MAIN STREET
8 FLOOD PROTECTION PROJECT 5,000,000
9 (XXI) WAYNE COUNTY
10 (A) SURVEY AND ANALYZE EXISTING RIDGE AND
11 TERRACE STORMWATER SYSTEM AND DEVELOP
12 ALTERNATIVE STORMWATER CONCEPTS 60,000
13 (XXII) WESTMORELAND COUNTY
14 (A) ADDITIONAL FUNDS FOR DGS PROJECT NO.
15 180-43, NORTHMONT STREET AREA FLOOD
16 PROTECTION PROJECT IN THE CITY OF
17 GREENSBURG 3,600,000
18 (7) Department of General Services
19 (I) BUCKS COUNTY <--
20 (A) DESIGN AND CONSTRUCTION OF A MULTI-
21 AGENCY EMERGENCY OPERATIONS CENTER 35,000,000
22 (BASE PROJECT ALLOCATION - $28,000,000)
23 (DESIGN AND CONTINGENCIES - $7,000,000)
24 (i) (II) Dauphin County <--
25 (A) Provide for steam plant replacements
26 and upgrades in Capitol Annex 1,563,000
27 (Base Project Allocation - $1,250,000)
28 (Design and Contingencies - $313,000)
29 (B) Provide for remediation of mold,
30 asbestos and other hazmat in buildings
20070H1589B3496 - 35 -
1 and equipment areas in Capitol Annex 5,625,000 2 (Base Project Allocation - $4,500,000) 3 (Design and Contingencies - $1,125,000) 4 (C) Upgrade building heating system and 5 install new air conditioning system in 6 Capitol Annex 3,750,000 7 (Base Project Allocation - $3,000,000) 8 (Design and Contingencies - $750,000) 9 (D) Replace main Capitol Complex 10 Substation switchgears including 11 control status board along with 12 transformers and circuit breakers 25,000,000 13 (Base Project Allocation - $20,000,000) 14 (Design and Contingencies - $5,000,000) 15 (E) Replace existing 15kv distribution 16 feeders throughout the Capitol Complex 17 and reset the system primary and 18 secondary circuit breakers for proper 19 overall system coordination 10,625,000 20 (Base Project Allocation - $8,500,000) 21 (Design and Contingencies - $2,125,000) 22 (F) Refurbish Capital Park by providing 23 for a new retaining wall along Walnut 24 Street including new grading and 25 installation of a water conduction 26 system 1,000,000 27 (Base Project Allocation - $750,000) 28 (Design and Contingencies - $250,000) 29 (G) Replace all cloth ceilings in halls of 30 the Capitol East Wing 1,000,000 20070H1589B3496 - 36 -
1 (Base Project Allocation - $750,000) 2 (Design and Contingencies - $250,000) 3 (H) Replace existing macadam with new 4 covering and sealant to prevent water 5 leakage and replace drains and piping 6 at the parking facility at 22nd and 7 Forster Streets, Harrisburg 1,100,000 8 (Base Project Allocation - $880,000) 9 (Design and Contingencies - $220,000) 10 (I) Repair the roof membrane and replace 11 broken pavers at the Rachel Carson 12 State Office Building 750,000 13 (Base Project Allocation - $600,000) 14 (Design and Contingencies - $150,000) 15 (J) PROVIDE FOR A CAPITOL COMPLEX - <-- 16 CAPITAL REHABILITATION AND IMPROVEMENTS 17 PROGRAM 25,000,000 18 (BASE PROJECT ALLOCATION - $20,000,000) 19 (DESIGN AND CONTINGENCIES - $5,000,000) 20 (K) DESIGN AND CONSTRUCTION OF A MULTI- 21 AGENCY EMERGENCY OPERATIONS CENTER 35,000,000 22 (BASE PROJECT ALLOCATION - $28,000,000) 23 (DESIGN AND CONTINGENCIES - $7,000,000) 24 (L) CONSTRUCTION, IMPROVEMENTS AND OTHER <-- 25 COSTS RELATED TO THE FORUM BUILDING 101,400,000 26 (II.1) IRVIS OFFICE BUILDING <-- 27 (A) CONSTRUCTION, INFRASTRUCTURE AND OTHER 28 RELATED COSTS TO RENOVATE THE IRVIS 29 OFFICE BUILDING 45,000,000 30 (BASE PROJECT ALLOCATION - $40,000,000) 20070H1589B3496 - 37 -
1 (DESIGN AND CONTINGENCIES - $5,000,000) 2 (III) LEBANON COUNTY 3 (A) DESIGN AND CONSTRUCTION OF A MULTI- 4 AGENCY EMERGENCY OPERATIONS CENTER 35,000,000 5 (BASE PROJECT ALLOCATION - $28,000,000) 6 (DESIGN AND CONTINGENCIES - $7,000,000) 7 (IV) PHILADELPHIA COUNTY 8 (A) DEVELOPMENT AND CONSTRUCTION OF THE 9 MILL CREEK COMMUNITY CENTER 12,000,000 10 (B) DEMOLITION AND ABATEMENT COSTS 11 ASSOCIATED WITH THE PASCHALL HOMES 12 REDEVELOPMENT PROJECT 8,600,000 13 (C) ENGINEERING RESEARCH AND EXTENSION 14 BUILDING 30,000,000 15 (D) INFRASTRUCTURE IMPROVEMENTS FOR THE 16 FORMER LIDDONFIELD HOMES AT TORRESDALE 17 AVENUE AND JACKSON PLACE 10,000,000 18 (E) ACQUISITION OF SITE, DESIGN, <-- 19 CONSTRUCTION, INFRASTRUCTURE AND OTHER 20 RELATED COSTS FOR THE FIRST JUDICIAL 21 DISTRICT FAMILY COURT BUILDING TO BE <-- 22 LOCATED AT 15TH AND ARCH STREETS 200,000,000 23 (E) ACQUISITION OF SITE, DESIGN, <-- 24 CONSTRUCTION, INFRASTRUCTURE AND OTHER 25 RELATED COSTS FOR A FACILITY TO BE 26 LOCATED AT 15TH AND ARCH STREETS TO BE 27 LEASED BY THE DEPARTMENT OF GENERAL 28 SERVICES TO THE CITY OF PHILADELPHIA 29 FOR FAIR MARKET VALUE FOR USE BY THE 30 FIRST JUDICIAL DISTRICT FOR A FAMILY 20070H1589B3496 - 38 -
1 COURT BUILDING 200,000,000 2 (F) INFRASTRUCTURE AND IMPROVEMENTS, <-- 3 INCLUDING STREETSCAPE AND OTHER RELATED 4 COSTS FOR DEVELOPMENT PROJECT 10,000,000 5 (8) Pennsylvania Historical and Museum Commission 6 (i) Daniel Boone Homestead 7 (A) Provide for site improvements and 8 restore the boyhood home of Daniel 9 Boone 960,000 10 (Base Project Allocation - $800,000) 11 (Design and Contingencies - $160,000) 12 (ii) Landis Valley Museum 13 (A) Provide for the design and 14 construction of a new maintenance 15 building 960,000 16 (Base Project Allocation - $800,000) 17 (Design and Contingencies - $160,000) 18 (iii) Pennsbury Manor 19 (A) Rehabilitate up to 23 buildings and 20 site development of infrastructure 21 throughout the site 1,920,000 22 (Base Project Allocation - $1,600,000) 23 (Design and Contingencies - $320,000) 24 (iv) Pennsylvania Lumber Museum 25 (A) Reconfigure entrance to the building 26 to permit one coordinated exhibit 27 gallery rather than two disjointed 28 galleries 2,400,000 29 (Base Project Allocation - $2,000,000) 30 (Design and Contingencies - $400,000) 20070H1589B3496 - 39 -
1 (9) Department of Military and Veterans Affairs 2 (i) Pittsburgh Hunt Readiness Center, 3 Allegheny County 4 (A) Rehabilitate readiness center 5 including assembly hall, classrooms, 6 administrative offices, storage spaces, 7 restrooms, locker rooms and mechanical 8 rooms 3,000,000 9 (Base Project Allocation - $2,400,000) 10 (Design and Contingencies - $600,000) 11 (ii) Southwestern Veterans Center, Allegheny 12 County 13 (A) Replace sewer main 331,000 14 (Base Project Allocation - $248,000) 15 (Design and Contingencies - $83,000) 16 (iii) Hollidaysburg Veterans Home, Blair 17 County 18 (A) Rehabilitate fire alarm and sprinkler 19 systems in Arnold, Dietary, Eisenhower 20 and MacArthur Halls to meet life safety 21 compliance 2,722,000 22 (Base Project Allocation - $2,268,000) 23 (Design and Contingencies - $454,000) 24 (iv) Harrisburg Military Post, Dauphin County 25 (A) Rehabilitate various buildings and 26 facilities on the military post 27 including assembly halls, classrooms, 28 administrative offices, storage spaces, 29 restrooms, locker rooms, mechanical 30 rooms and expanded parking 6,000,000 20070H1589B3496 - 40 -
1 (Base Project Allocation - $4,800,000)
2 (Design and Contingencies - $1,200,000)
3 (v) Wilkes-Barre Readiness Center, Luzerne
4 County
5 (A) Rehabilitate readiness center
6 including assembly hall, classrooms,
7 administrative offices, storage spaces,
8 restrooms, locker rooms, mechanical
9 rooms and rehabilitation and expansion
10 of parking 4,000,000
11 (Base Project Allocation - $3,200,000)
12 (Design and Contingencies - $800,000)
13 (VI) HERMITAGE READINESS CENTER, MERCER COUNTY <--
14 (A) ADDITIONAL FUNDING TO SUPPORT
15 CONSTRUCTION OF NEW PENNSYLVANIA
16 NATIONAL GUARD READINESS CENTER (DGS
17 PROJECT 963-16) 750,000
18 (BASE PROJECT ALLOCATION - $605,000)
19 (DESIGN AND CONTINGENCIES - $145,000)
20 (vi) (VII) Southeastern Veterans Center, <--
21 Montgomery County
22 (A) Rehabilitate fire alarm and sprinkler
23 systems to meet life safety compliance 1,276,000
24 (Base Project Allocation - $1,063,000)
25 (Design and Contingencies - $213,000)
26 (VIII) EASTON READINESS CENTER, NORTHAMPTON <--
27 COUNTY
28 (A) ADDITIONAL FUNDING TO SUPPORT
29 CONSTRUCTION OF NEW PENNSYLVANIA
30 NATIONAL GUARD READINESS CENTER (DGS
20070H1589B3496 - 41 -
1 PROJECT 961-9) 800,000 2 (BASE PROJECT ALLOCATION - $600,000) 3 (DESIGN AND CONTINGENCIES - $200,000) 4 (vii) (IX) Philadelphia Lancaster Avenue <-- 5 Readiness Center, Philadelphia County 6 (A) Rehabilitate readiness center to 7 include assembly hall, classrooms, 8 administrative offices, storage spaces, 9 restrooms, locker rooms and mechanical 10 rooms 6,000,000 11 (Base Project Allocation - $5,000,000) 12 (Design and Contingencies - $1,000,000) 13 (viii) (X) Philadelphia Southampton Road <-- 14 Armory, Philadelphia County 15 (A) Replace several air handling units and 16 associated pumps and motors and install 17 new chiller with ice storage capacity 18 to be made at night that will 19 distribute cooling during the day 1,500,000 20 (Base Project Allocation - $1,300,000) 21 (Design and Contingencies - $200,000) 22 (ix) Keystone Lodge, Lebanon County <-- 23 (A) Construction, infrastructure and other 24 related costs 1,300,000 25 (XI) SOUTHEASTERN VETERANS CENTER, CHESTER <-- 26 COUNTY 27 (A) ADDITIONAL FUNDS FOR DGS PROJECT 960- 28 55 6,000,000 29 (XII) DAUPHIN OR LEBANON COUNTY <-- 30 (A) CONSTRUCTION OF A NEW VETERANS' HOME 20070H1589B3496 - 42 -
1 TO BE LOCATED IN DAUPHIN OR LEBANON 2 COUNTY, INCLUDING LAND ACQUISITION 87,000,000 3 (BASE PROJECT ALLOCATION - $75,000,000) 4 (LAND ALLOCATION - $12,000,000) 5 (10) Department of Public Welfare 6 (i) Allentown State Hospital 7 (A) Upgrade three coal boilers currently 8 in poor condition and replace traveling 9 grate stokers and controls 3,600,000 10 (Base Project Allocation - $3,000,000) 11 (Design and Contingencies - $600,000) 12 (ii) Clarks Summit State Hospital 13 (A) Replace the electrical distribution 14 center at the sewage treatment plant 15 and install new 400 amp service, motor 16 control center, new transformer and new 17 back-up supply 1,200,000 18 (Base Project Allocation - $1,000,000) 19 (Design and Contingencies - $200,000) 20 (II.1) DANVILLE STATE HOSPITAL <-- 21 (A) ADDITIONAL FUNDS FOR DGS PROJECT 503- 22 15, EXTERIOR IMPROVEMENTS TO BLOCK 23 BUILDING 2,160,000 24 (BASE PROJECT ALLOCATION - $1,800,000) 25 (DESIGN AND CONTINGENCIES - $360,000) 26 (iii) Ebensburg Center 27 (A) Replace all roofed areas which cover 28 residential housing units 1,440,000 29 (Base Project Allocation - $1,200,000) 30 (Design and Contingencies - $240,000) 20070H1589B3496 - 43 -
1 (B) Replace current emergency generators 2 with stand alone outside units in all 3 seven residential units 1,500,000 4 (Base Project Allocation - $1,250,000) 5 (Design and Contingencies - $250,000) 6 (iv) Loysville Youth Development Center 7 (A) Construct a modular multipurpose 8 gym/kitchen/classroom building 3,000,000 9 (Base Project Allocation - $2,500,000) 10 (Design and Contingencies - $500,000) 11 (v) Loysville Complex, South Mountain Secure 12 Treatment Unit 13 (A) Construct a modular multipurpose 14 gym/kitchen/classroom building 3,000,000 15 (Base Project Allocation - $2,500,000) 16 (Design and Contingencies - $500,000) 17 (vi) Mayview State Hospital 18 (A) Upgrade the primary electrical system 19 including all central feeder circuits 3,000,000 20 (Base Project Allocation - $2,500,000) 21 (Design and Contingencies - $500,000) 22 (vii) Norristown State Hospital 23 (A) Renovate the boiler plant for building 24 60, Phase 3 of DGS project 509-29, 25 reconstruction or replacement of 26 boilers to meet emissions requirements 27 and upgrade the steam distribution 28 system 1,800,000 29 (Base Project Allocation - $1,500,000) 30 (Design and Contingencies - $300,000) 20070H1589B3496 - 44 -
1 (viii) Polk Center 2 (A) Replace valves, backwash pump and 3 replenish filters with new media in 4 order to keep water plant in compliance 5 with regulations 1,400,000 6 (Base Project Allocation - $1,120,000) 7 (Design and Contingencies - $280,000) 8 (ix) Selinsgrove Center 9 (A) Upgrade the boiler controls for the 10 facility 600,000 11 (Base Project Allocation - $500,000) 12 (Design and Contingencies - $100,000) 13 (B) Purchase and install package boiler 14 for more efficient handling of summer 15 steam load 960,000 16 (Base Project Allocation - $800,000) 17 (Design and Contingencies - $160,000) 18 (x) South Mountain Restoration Center 19 (A) Purchase and install package boiler 20 for more efficient handling of summer 21 steam load 840,000 22 (Base Project Allocation - $700,000) 23 (Design and Contingencies - $140,000) 24 (xi) Torrance State Hospital 25 (A) Bore two horizontal wells into a 26 mountainside to expand and improve 27 freshwater collection 720,000 28 (Base Project Allocation - $600,000) 29 (Design and Contingencies - $120,000) 30 (xii) Wernersville State Hospital 20070H1589B3496 - 45 -
1 (A) Upgrade coal boiler refractory and 2 structural components 360,000 3 (Base Project Allocation - $300,000) 4 (Design and Contingencies - $60,000) 5 (xiii) White Haven Center 6 (A) Replace the heating systems in 7 residential buildings from existing old 8 radiant heat to more modern, digitally- 9 controlled, high-efficiency HVAC 10 systems 2,400,000 11 (Base Project Allocation - $2,000,000) 12 (Design and Contingencies - $400,000) 13 (10.1) PENNSYLVANIA EMERGENCY MANAGEMENT AGENCY <-- 14 (I) DAUPHIN COUNTY 15 (A) CONSTRUCTION, LAND ACQUISITION, 16 INFRASTRUCTURE DEVELOPMENT AND OTHER 17 RELATED COSTS FOR OFFICE SPACE 50,000,000 18 (II) LEBANON COUNTY 19 (A) CONSTRUCTION, LAND ACQUISITION, 20 INFRASTRUCTURE DEVELOPMENT AND OTHER 21 RELATED COSTS FOR OFFICE SPACE 50,000,000 22 (III) PENNSYLVANIA STATE FIREFIGHTERS' <-- 23 MEMORIAL 24 (A) ACQUISITION, INFRASTRUCTURE, 25 CONSTRUCTION AND OTHER RELATED COSTS 26 FOR CONSTRUCTION OF A STATE 27 FIREFIGHTERS MEMORIAL AT A LOCATION TO 28 BE DETERMINED BY THE STATE FIRE 29 COMMISSIONER 500,000 30 (11) Pennsylvania State Police 20070H1589B3496 - 46 -
1 (i) Dunmore Headquarters, Lackawanna County 2 (A) Construct a new headquarters facility, 3 garage and hangar to replace existing 4 facilities in Lackawanna County 10,800,000 5 (Base Project Allocation - $9,000,000) 6 (Design and Contingencies - $1,800,000) 7 (II) PHILADELPHIA HEADQUARTERS, PHILADELPHIA <-- 8 (A) RENOVATION AND EXPANSION OF 9 PHILADELPHIA HEADQUARTERS, INCLUDING 10 LAND ACQUISITION AND CONSTRUCTION 26,000,000 11 (12) State System of Higher Education 12 (i) Bloomsburg University of Pennsylvania 13 (A) Additional funding for the renovation 14 of the Nelson Field House while 15 providing additional athletic and 16 office space 1,000,000 17 (B) ADDITIONAL FUNDS FOR RENOVATION OF THE <-- 18 WALLER ADMINISTRATION BUILDING 6,000,000 19 (ii) Cheyney University of Pennsylvania 20 (A) Additional funding to replace Browne 21 Hall including upgrading infrastructure 22 according to modern codes and fire 23 safety code requirements 1,000,000 24 (B) ADDITIONAL FUNDS FOR RENOVATION OF <-- 25 CARVER SCIENCE BUILDING 6,000,000 26 (C) FUNDING FOR ADA MODIFICATIONS 8,000,000 27 (D) WASTEWATER TREATMENT PLANT UPGRADES 10,000,000 28 (E) ADDITIONAL FUNDS FOR THE CONSTRUCTION 29 OF NEW STUDENT HOUSING 25,000,000 30 (F) ADDITIONAL FUNDS FOR DGS PROJECT 403- <-- 20070H1589B3496 - 47 -
1 72, UTILITY AND INFRASTRUCTURE 2 RENOVATIONS 3,500,000 3 (G) ADDITIONAL FUNDS FOR DGS PROJECT 403- 4 66, RENOVATIONS TO BIDDLE HALL 400,000 5 (H) ADDITIONAL FUNDS FOR DGS PROJECT 403- 6 76, RENOVATIONS TO HUMPHREYS HALL 5,000,000 7 (iii) California University of Pennsylvania 8 (A) Construction and other related costs 9 to upgrade university stadium 10 facilities 250,000 11 (B) HIGH-VOLTAGE UPGRADES 4,000,000 <-- 12 (C) RENOVATION OF KEYSTONE HALL 13,000,000 13 (D) ADDITIONAL FUNDS FOR PEDESTRIAN AND 14 VEHICULAR ENHANCEMENTS, PHASE I 2,000,000 15 (iv) East Stroudsburg University of 16 Pennsylvania 17 (A) Additional funding for the replacement 18 of Rosenkrans Hall, providing 19 additional classroom, laboratory and 20 office space 8,000,000 <-- 21 OFFICE SPACE 9,000,000 <-- 22 (B) Construction and other costs related 23 to the East Stroudsburg University 24 Conference Center 2,000,000 25 (C) Construction and other related costs 26 to build a parking deck to serve East 27 Stroudsburg University and Pocono 28 Medical Center 3,500,000 29 (D) ADDITIONAL FUNDS FOR ADDITION AND <-- 30 RENOVATION OF EILER-MARTIN STADIUM 5,000,000 20070H1589B3496 - 48 -
1 (E) RENOVATION OF FOOTBALL STADIUM AND 2 PRESS BOX 3,000,000 3 (F) EXPANSION AND RENOVATION OF FIELD <-- 4 HOUSE 3,000,000 5 (v) Edinboro University of Pennsylvania 6 (A) Renovate or replace Ross Hall 7 including infrastructure and exterior 8 surfaces 10,000,000 <-- 9 SURFACES 18,000,000 <-- 10 (B) ADDITIONAL FUNDS FOR MAINTENANCE 11 BUILDING REPLACEMENT 8,000,000 12 (V.1) KUTZTOWN UNIVERSITY <-- 13 (A) RENOVATIONS AND CONSTRUCTION OF THE 14 POPLAR HOUSE TO HOUSE THE INSTITUTE FOR 15 CHILDREN'S HEALTH 3,500,000 16 (C) CONSTRUCTION OF AN AIR-SUPPORTED, <-- 17 DOME-SHAPED INDOOR PRACTICE AND 18 RECREATION FACILITY 3,400,000 19 (vi) Lock Haven University of Pennsylvania 20 (A) Costs associated with furniture and <-- 21 equipment for a new indoor athletic 22 facility 1,000,000 23 (A) CONSTRUCTION AND OTHER COSTS <-- 24 ASSOCIATED WITH BUILDING A NEW INDOOR 25 ATHLETIC FACILITY 10,000,000 <-- 26 ATHLETIC FACILITY AT THE LOCK HAVEN <-- 27 UNIVERSITY CLEARFIELD CAMPUS 10,000,000 28 (VII) CLARION UNIVERSITY OF PENNSYLVANIA <-- 29 (A) ADDITIONAL FUNDS FOR MODIFICATION OF 30 FACILITIES FOR ADA COMPLIANCE 3,000,000 20070H1589B3496 - 49 -
1 (B) ADDITIONAL FUNDS FOR ADDITION AND 2 RENOVATION OF MARWICK BOYD FINE ARTS 3 CENTER 12,000,000 4 (C) RENOVATION AND EXPANSION OF TIPPIN 5 GYMNASIUM 40,000,000 6 (VIII) INDIANA UNIVERSITY OF PENNSYLVANIA 7 (A) ADDITIONAL FUNDS FOR RENOVATION OF 8 LEONARD HALL 7,000,000 9 (B) RENOVATION OF STABLEY LIBRARY 7,000,000 10 (C) CONSTRUCTION, REDEVELOPMENT AND OTHER <-- 11 COSTS RELATED TO IMPROVEMENTS TO 12 ATHLETIC FACILITIES 5,000,000 13 (IX) KUTZTOWN UNIVERSITY OF PENNSYLVANIA 14 (A) REPLACEMENT OF SOUTH BLEACHERS IN THE 15 FOOTBALL STADIUM 1,000,000 16 (B) ADDITIONAL FUNDS FOR UPGRADE OF 17 KEYSTONE HALL 16,000,000 18 (C) REPLACEMENT OF LYTLE HALL 30,000,000 19 (D) RENOVATIONS AND CONSTRUCTION OF THE <-- 20 POPLAR HOUSE TO HOUSE THE INSTITUTE FOR 21 CHILDREN'S HEALTH 3,500,000 22 (E) INSTALLATION OF A CAMERA SECURITY 23 SYSTEM 2,000,000 24 (X) MANSFIELD UNIVERSITY OF PENNSYLVANIA 25 (A) WATER TREATMENT PLANT UPGRADES 6,000,000 26 (XI) MILLERSVILLE UNIVERSITY OF PENNSYLVANIA 27 (A) RENOVATION OF BYERLY HALL 6,000,000 28 (B) RENOVATION OF STAYER BUILDING 7,000,000 29 (XII) SHIPPENSBURG UNIVERSITY OF PENNSYLVANIA 30 (A) ADDITIONAL FUNDING FOR STEAM 20070H1589B3496 - 50 -
1 DISTRIBUTION SYSTEM RENOVATION 10,000,000 2 (B) REDEVELOPMENT, INCLUDING CONSTRUCTION, 3 INFRASTRUCTURE AND ACQUISITION OF THE 4 HOFFMAN MILLS BUILDING 2,500,000 5 (C) CONSTRUCTION AND RELATED 6 INFRASTRUCTURE TO UPGRADE SHIPPENSBURG 7 UNIVERSITY ATHLETIC COMPLEX 1,000,000 <-- 8 UNIVERSITY ATHLETIC COMPLEX 5,000,000 <-- 9 (D) REPLACEMENT OF HEATING AND COOLING <-- 10 WATER LINE 20,000,000 11 (E) CONSTRUCTION OF A COOLING AND HOT 12 WATER PLANT 30,000,000 13 (XIII) SLIPPERY ROCK UNIVERSITY OF 14 PENNSYLVANIA 15 (A) ADDITIONAL FUNDS FOR RENOVATION OF 16 MORROW FIELD HOUSE 16,000,000 17 (XIV) WEST CHESTER UNIVERSITY OF PENNSYLVANIA 18 (A) PHASE I OF CAMPUS GEOTHERMAL UTILITY 19 CONVERSION 10,000,000 20 (B) RENOVATION OF MCCARTHY HALL 20,000,000 21 (C) ACQUISITION, INFRASTRUCTURE <-- 22 IMPROVEMENTS AND CONSTRUCTION OF 23 UNDERGRADUATE BUSINESS CENTER 15,000,000 24 (13) Department of Transportation 25 (i) Clearfield County 26 (A) Replace or rehabilitate District 2-0 27 Office including an addition on current 28 site and infrastructure improvements 12,000,000 29 (Base Project Allocation - $10,000,000) 30 (Design and Contingencies - $2,000,000) 20070H1589B3496 - 51 -
1 (ii) Dauphin County
2 (A) Construct or acquire a new county
3 maintenance facility including salt and
4 equipment storage buildings and site
5 development 13,800,000
6 (Base Project Allocation - $11,000,000)
7 (Land Allocation - $1,000,000)
8 (Design and Contingencies - $1,800,000)
9 (B) Construct or acquire a new PennDOT
10 driver and motor vehicle central
11 office/service center including design,
12 site acquisition and construction 58,000,000
13 (Base Project Allocation - $50,000,000)
14 (Land Allocation - $3,000,000)
15 (Design and Contingencies - $5,000,000)
16 (II.1) LAWRENCE COUNTY <--
17 (A) RENOVATE AND EXPAND SITE 16 SAFETY
18 REST AREA IN LAWRENCE COUNTY, INCLUDING
19 STORAGE, PARKING AND DEVELOPMENT 2,000,000
20 (BASE PROJECT ALLOCATION - $1,800,000)
21 (DESIGN AND CONTINGENCIES - $200,000)
22 (II.1) (II.2) MCKEAN COUNTY <--
23 (A) ACQUISITION AND INFRASTRUCTURE RELATED
24 TO THE CONSTRUCTION OF THE ROUTE 219
25 VISITOR/DISCOVERY CENTER 8,200,000
26 (iii) Mifflin County
27 (A) Construct or acquire a new county
28 maintenance facility including salt and
29 equipment storage buildings and site
30 development 13,800,000
20070H1589B3496 - 52 -
1 (Base Project Allocation - $11,000,000) 2 (Land Allocation - $1,000,000) 3 (Design and Contingencies - $1,800,000) 4 (III.1) PHILADELPHIA COUNTY <-- 5 (A) AVENUE OF THE ARTS, NORTH BROAD 6 STREETSAPE IMPROVEMENTS 20,000,000 7 (iv) Wyoming County 8 (A) Construct or acquire a new county 9 maintenance facility including salt and 10 equipment storage buildings and site 11 development 13,800,000 12 (Base Project Allocation - $11,000,000) 13 (Land Allocation - $1,000,000) 14 (Design and Contingencies - $1,800,000) 15 (14) PHILADELPHIA REGIONAL PORT AUTHORITY <-- 16 (I) PHILADELPHIA COUNTY 17 (A) ACQUISITION AND DEVELOPMENT OF DREDGE 18 MATERIAL DISPOSAL SITES 300,000,000 19 (B) GENERAL IMPROVEMENTS TO PORT 20 FACILITIES 200,000,000 21 Section 4. Itemization of furniture and equipment projects. 22 Additional capital projects in the category of public 23 improvement projects consisting of the acquisition of movable 24 furniture and equipment to complete public improvement projects 25 and to be purchased by the Department of General Services, its 26 successors or assigns and to be financed by the incurring of 27 debt are hereby itemized, together with their respective 28 estimated financial costs, as follows: 29 Total 30 Project 20070H1589B3496 - 53 -
1 Project Allocation 2 (1) Office of Administration 3 (i) Statewide mobile radio and microwave 4 system 5 (A) Additional funds for original 6 furniture and equipment to make the 7 Statewide radio and microwave system 8 DGS project 950-10 operational 21,000,000 9 (2) Department of Conservation and Natural 10 Resources 11 (i) Benjamin Rush State Park 12 (A) Original furniture and equipment for 13 current capital projects 217,000 14 (ii) Cook Forest State Park 15 (A) Original furniture and equipment for 16 current capital projects 114,000 17 (iii) Delaware Canal State Park 18 (A) Original furniture and equipment for 19 current capital projects 200,000 20 (iv) Kinzua Bridge State Park 21 (A) Original furniture and equipment for 22 current capital projects 3,000,000 23 (v) Nescopeck State Park 24 (A) Original furniture and equipment for 25 current capital projects 150,000 26 (vi) Pine Grove Furnace State Park 27 (A) Original furniture and equipment for 28 current capital projects 200,000 29 (vii) Presque Isle State Park 30 (A) Original furniture and equipment for 20070H1589B3496 - 54 -
1 current capital projects 400,000 2 (viii) Sinnemahoning State Park 3 (A) Original furniture and equipment for 4 current capital projects 2,000,000 5 (3) Department of Corrections 6 (i) (Reserved) 7 (ii) State Correctional Institution at 8 Graterford 9 (A) Original furniture and equipment for 10 the new institution at SCI Graterford 6,500,000 11 (iii) State Correctional Institution at 12 Huntingdon 13 (A) Original furniture and equipment for 14 the new institution at SCI Huntingdon 6,500,000 15 (iv) State Correctional Institution at 16 Rockview 17 (A) Original furniture and equipment for 18 the new institution 6,500,000 19 (v) New State Correctional Institution in 20 Luzerne County 21 (A) Original furniture and equipment for 22 the new institution within a five-mile 23 radius of SCI Retreat 6,500,000 24 (VI) NEW STATE CORRECTIONAL INSTITUTION IN <-- 25 FAYETTE COUNTY 26 (A) ORIGINAL FURNITURE AND EQUIPMENT FOR 27 NEW INSTITUTION 6,500,000 28 (VII) NEW STATE CORRECTIONAL INSTITUTION IN <-- 29 NORTHUMBERLAND COUNTY 30 (A) ORIGINAL FURNITURE AND EQUIPMENT FOR 20070H1589B3496 - 55 -
1 THE NEW INSTITUTION 6,500,000 2 (4) Department of Education 3 (i) Scranton School for the Deaf 4 (A) Movable furniture and equipment to 5 allow modernization of classrooms and 6 other buildings to meet current 7 standards 2,625,000 8 (ii) Lincoln University 9 (A) Movable furniture and equipment to 10 allow construction project at Wright 11 Hall to become operational 3,000,000 12 (B) Movable furniture and equipment at 13 Langston Hughes Library for use for the 14 completely renovated facility 4,000,000 15 (4.1) Department of Military and Veterans Affairs <-- 16 (i) Keystone Lodge at Fort Indiantown Gap 17 (A) Original furniture and equipment 500,000 18 (C) FURNITURE AND EQUIPMENT FOR GRIM HALL <-- 19 RENOVATIONS, DGS PROJECT NO. 1101-39 2,000,000 20 (D) FURNITURE AND EQUIPMENT FOR ACADEMIC 21 STUDENT CENTER, DGS PROJECT NO. 1101- 22 47 5,000,000 23 (III) THE PENNSYLVANIA STATE UNIVERSITY 24 (A) LABS AND ORIGINAL FURNISHINGS FOR THE 25 CHEMICAL ENGINEERING BUILDING 8,600,000 26 (B) ALTOONA CAMPUS, ENGINEERING BUILDING 27 LAB EQUIPMENT 4,500,000 28 (C) DUBOIS CAMPUS, ENGINEERING BUILDING 29 LAB EQUIPMENT 4,500,000 30 (D) UNIVERSITY PARK, ENGINEERING BUILDING 20070H1589B3496 - 56 -
1 LAB EQUIPMENT 10,000,000 2 (E) UNIVERSITY PARK, ORIGINAL EQUIPMENT <-- 3 FOR A NEWLY CONSTRUCTED APPLIED 4 RESEARCH LAB BUILDING 10,000,000 5 (4.1) DEPARTMENT OF GENERAL SERVICES <-- 6 (I) CAPITAL EAST WING OFFICE BUILDING 7 (A) PURCHASES OF FURNITURE AND EQUIPMENT 8 FOR THE EAST WING 4,500,000 9 (II) IRVIS OFFICE BUILDING 10 (A) PURCHASES OF FURNITURE AND EQUIPMENT 11 FOR THE IRVIS OFFICE BUILDING 5,000,000 12 (5) Pennsylvania Historical and Museum Commission 13 (i) Eckley Miners' Village 14 (A) Replacement of original furniture and 15 equipment associated with the visiting 16 public 1,920,000 17 (ii) Graeme Park 18 (A) Original furniture and equipment 19 associated with the new orientation 20 exhibit 720,000 21 (iii) Landis Valley Museum 22 (A) Construct new museum exhibits for the 23 expanded visitors' center building and 24 other buildings 1,800,000 25 (iv) State Records Center 26 (A) Original furniture and equipment 27 including a mobile high density storage 28 system 1,800,000 29 (5.1) PENNSYLVANIA EMERGENCY MANAGEMENT AGENCY <-- 30 (I) DAUPHIN COUNTY 20070H1589B3496 - 57 -
1 (A) ORIGINAL FURNITURE AND EQUIPMENT FOR 2 NEW OFFICE SPACE CONSTRUCTION 10,000,000 3 (II) LEBANON COUNTY 4 (A) ORIGINAL FURNITURE AND EQUIPMENT FOR 5 NEW OFFICE SPACE CONSTRUCTION 10,000,000 6 (5.2) PENNSYLVANIA STATE POLICE 7 (I) PHILADELPHIA 8 (A) ORIGINAL FURNITURE AND EQUIPMENT FOR 9 THE EXPANSION OF PHILADELPHIA 10 HEADQUARTERS 2,000,000 11 (6) State System of Higher Education 12 (I) BLOOMSBURG UNIVERSITY OF PENNSYLVANIA <-- 13 (A) ADDITIONAL FUNDING FOR ORIGINAL 14 FURNITURE AND EQUIPMENT FOR SUTLIFF 15 HALL ADDITION 500,000 16 (II) EAST STROUDSBURG UNIVERSITY OF 17 PENNSYLVANIA 18 (A) ADDITIONAL FUNDING FOR ORIGINAL 19 FURNITURE AND EQUIPMENT FOR ROSENKRANS 20 HALL 1,000,000 21 (i) (III) Kutztown University of Pennsylvania <-- 22 (A) Supplemental funding for the purchase 23 of movable furniture and equipment to 24 allow Schaffer Auditorium construction 25 project to become operational 500,000 26 (B) FURNITURE, FIXTURES AND EQUIPMENT FOR <-- 27 THE SHARADINE ART BUILDING 1,900,000 28 (C) INSTALLATION OF A CAMERA SECURITY <-- 29 SYSTEM 2,000,000 30 (IV) LINCOLN UNIVERSITY OF PENNSYLVANIA 20070H1589B3496 - 58 -
1 (A) FURNITURE AND EQUIPMENT FOR GRIM HALL 2 RENOVATION, DGS PROJECT NO. 1101-39 2,000,000 3 (B) FURNITURE AND EQUIPMENT FOR ACADEMIC 4 STUDENT CENTER, DGS PROJECT NO. 1101- 5 47 5,000,000 6 (IV) (RESERVED) <-- 7 (ii) (V) Lock Haven University of Pennsylvania <-- 8 (A) Construction and other costs <-- 9 associated with building a new indoor 10 athletic facility 10,000,000 11 (A) COSTS ASSOCIATED WITH FURNITURE AND <-- 12 EQUIPMENT FOR A NEW INDOOR ATHLETIC 13 FACILITY 1,000,000 <-- 14 FACILITY AT THE LOCK HAVEN UNIVERSITY <-- 15 CLEARFIELD CAMPUS 1,000,000 16 (B) ADDITIONAL FUNDING FOR ORIGINAL <-- 17 FURNITURE AND EQUIPMENT FOR THE OLD 18 KCSD HIGH SCHOOL RENOVATION PROJECT 1,500,000 19 (iii) (VI) Millersville University of <-- 20 Pennsylvania 21 (A) Supplemental funding for the purchase 22 of movable furniture and equipment to 23 allow Theatre Arts Education Building 24 construction project to become 25 operational 200,000 26 (iv) (VII) Shippensburg University of <-- 27 Pennsylvania 28 (A) Supplemental funding for the purchase 29 of movable furniture and equipment to 30 allow Huber Arts Center construction 20070H1589B3496 - 59 -
1 project to become operational 500,000
2 (v) (VIII) Slippery Rock University of <--
3 Pennsylvania
4 (A) Supplemental funding for the purchase
5 of movable furniture and equipment to
6 allow Performing Arts Center
7 construction project to become
8 operational 1,000,000
9 Section 5. Itemization of transportation assistance projects.
10 (a) Mass transit.--Additional capital projects in the
11 category of transportation assistance projects for mass transit
12 in which an interest is to be acquired or constructed by the
13 Department of Transportation, its successors or assigns and to
14 be financed by the incurring of debt are hereby itemized,
15 together with their estimated financial costs, as follows:
16 Total
17 Project
18 Project Allocation
19 (1) Beaver County Transit Authority
20 (i) Provide for improvements in bus
21 circulation, passenger waiting and terminal
22 areas at the Rochester Transportation
23 Center (RTC), pedestrian improvements with
24 the Transit Revitalization Investment
25 District (TRID) area and from the RTC to
26 the Rochester riverfront development and
27 signal preemption/prioritization request
28 system in the TRID area 317,000
29 (Base Project Allocation - $285,000)
30 (Design and Contingencies - $32,000)
20070H1589B3496 - 60 -
1 (2) Berks Area Reading Transit Authority 2 (i) Purchase and install an Auto Vehicle 3 Locator System for both fixed route and 4 paratransit systems 167,000 5 (Base Project Allocation - $150,000) 6 (Design and Contingencies -$17,000) 7 (2.1) BUCKS COUNTY TRANSPORTATION MANAGEMENT <-- 8 ASSOCIATION 9 (I) COSTS RELATED TO PHASE II OF THE 10 QUAKERTOWN-STONEY CREEK PASSENGER RAIL 11 RESTORATION PROJECT 5,000,000 12 (3) Cambria County Transit Authority 13 (i) Replace bus wash system, upgrade 14 communication system and purchase security 15 surveillance system 100,000 16 (Base Project Allocation - $90,000) 17 (Design and Contingencies - $10,000) 18 (ii) Construct rural transfer center to 19 increase service efficiency, attract new 20 riders and provide easier transfers for 21 riders 100,000 22 (Base Project Allocation - $90,000) 23 (Design and Contingencies - $10,000) 24 (4) Capital Area Transit 25 (i) Improve and renovate CAT's maintenance 26 building to include three bays to repair 27 and service 40-foot low floor buses 233,000 28 (Base Project Allocation - $210,000) 29 (Design and Contingencies - $23,000) 30 (5) Centre Area Transportation Authority 20070H1589B3496 - 61 -
1 (i) Purchase 16 buses to replace buses which 2 have met their useful life 167,000 3 (Base Project Allocation - $150,000) 4 (Design and Contingencies - $17,000) 5 (ii) Purchase automatic vehicle locator system 6 with the first phase to equip buses and 7 service vehicles with such items as the 8 automatic enunciators, electronic 9 performance monitoring, stop-by-stop 10 passenger counts, real time passenger 11 information via the Internet and at major 12 stops 156,000 13 (Base Project Allocation - $140,000) 14 (Design and Contingencies - $16,000) 15 (III) PARK AND RIDE FACILITY 2,500,000 <-- 16 (6) Crawford Area Transportation Authority 17 (i) Construct administrative intermodal center 18 in downtown Meadville and purchase bus 19 related equipment 333,000 20 (Base Project Allocation - $300,000) 21 (Design and Contingencies - $33,000) 22 (6.1) Elizabethtown Intermodal Transportation 23 Center 24 (i) Construction of a high-level platform and 25 elevators at existing Elizabethtown train 26 station 2,000,000 27 (Base Project Allocation - $2,000,000) 28 (ii) Construction of a new parking garage 29 adjacent to Intermodal Transportation 30 Center 4,000,000 20070H1589B3496 - 62 -
1 (Base Project Allocation - $4,000,000) 2 (6.2) ELK COUNTY AREA TRANSPORTATION AUTHORITY <-- 3 (I) CONSTRUCTION OF THE DEPOT STREET 4 INTERMODAL TRANSPORTATION FACILITY AND 5 PARKING DECK IN THE CITY OF ST. MARY'S 1,500,000 6 (7) Erie Metropolitan Transit Authority 7 (i) Acquire five buses to replace five 8 existing buses which have exceeded their 9 useful life 379,000 10 (Base Project Allocation - $341,000) 11 (Design and Contingencies - $38,000) 12 (ii) Renovate administration/maintenance 13 facility and purchase shop and 14 miscellaneous equipment 39,000 15 (Base Project Allocation - $35,000) 16 (Design and Contingencies - $4,000) 17 (iii) Purchase technology upgrades to radio 18 and fare box systems and complete system 19 wide signage 33,000 20 (Base Project Allocation - $30,000) 21 (Design and Contingencies - $3,000) 22 (7.1) Indiana County Transit Authority 23 (i) Renovation and expansion of bus garage 24 project 260,000 25 (Base Project Allocation - $260,000) 26 (7.2) Port Authority of Allegheny County 27 (i) FY 2009-2010 Federal Flex Funds (STP 28 and/or CMAQ) 2,000,000 29 (ii) FY 2009-2010 section 5309 fixed guideway 30 modernization 5,000,000 20070H1589B3496 - 63 -
1 (iii) FY 2009-2010 East-West Corridor Rapid 2 Transit 5,000,000 3 (iv) FY 2009-2010 infrastructure Safety 4 Renewal Program (ISRP) 17,000,000 5 (v) FY 2009-2010 vehicle overhaul 4,000,000 6 (vi) FY 2009-2010 section 5307 Formula 7 Program 7,000,000 8 (VII) COMPLETION OF LINEAR PARK IN EDGEWOOD <-- 9 BOROUGH ADJACENT TO EAST BUSWAY FACILITY 7,200,000 10 (VIII) CONSTRUCTION AND INFRASTRUCTURE-RELATED 11 COSTS FOR THE ROBINSON INTERMODAL FACILITY 4,000,000 12 (7.3) Luzerne County 13 (i) Acquisition, construction, infrastructure 14 and other related costs for an intermodal 15 transportation facility in City of Wilkes- 16 Barre 4,000,000 17 (7.4) MONTGOMERY COUNTY <-- 18 (I) CONSTRUCTION AND RENOVATIONS FOR 19 JENKINTOWN INTERMODAL FACILITY TO INCLUDE 20 PARKING AND TRANSIT ACCESS 2,000,000 21 (7.5) MOUNT JOY AMTRAK STATION 22 (I) INFRASTRUCTURE, CONSTRUCTION AND OTHER 23 RELATED COSTS FOR THE RENOVATIONS AND 24 UPGRADES TO FACILITIES, INCLUDING ADA- 25 RELATED IMPROVEMENTS AND THE CONSTRUCTION 26 OF A PLATFORM FOR FREIGHT AND PASSENGER 27 USE 1,900,000 28 (8) Red Rose Transit Authority 29 (i) Replace bus washer and renovation and 30 expand bus storage building 375,000 20070H1589B3496 - 64 -
1 (Base Project Allocation - $337,000) 2 (Design and Contingencies - $38,000) 3 (ii) Design and construct new station on 4 AMTRAK Harrisburg to Philadelphia line in 5 Paradise Township, Lancaster County 200,000 6 (Base Project Allocation - $180,000) 7 (Design and Contingencies - $20,000) 8 (9) Shenango Valley Shuttle Service 9 (i) Construct a maintenance facility including 10 equipment and land acquisition 250,000 11 (Base Project Allocation - $225,000) 12 (Design and Contingencies - $25,000) 13 (10) Southeastern Pennsylvania Transportation 14 Authority 15 (i) Provide for the rehabilitation of 16 improvements at Croyden and Levittown 17 Stations located in Bucks County with 18 improvements to include the installation of 19 bus shelters and transit signage, station 20 improvements, bus access improvements at 21 both stations and parking expansion 3,500,000 22 (Base Project Allocation - $3,150,000) 23 (Design and Contingencies - $350,000) 24 (ii) Provide for the rehabilitation of 25 improvements to bus and rail intermodal 26 connections at the Glenside and Jenkintown 27 Stations in Montgomery County with 28 improvements to include design and 29 construction of a multilevel 384 space 30 parking garage at Glenside Station and a 20070H1589B3496 - 65 -
1 multilevel 700 space parking garage at 2 Jenkintown Station 6,700,000 3 (Base Project Allocation - $6,030,000) 4 (Design and Contingencies - $670,000) 5 (iii) FFY 2008 Transit Enhancement Program, 6 provide for renovation and preservation of 7 historic train stations and related 8 activities including bus shelters, 9 landscaping, street lights, pedestrian 10 access and walkways, bicycle access, 11 signage and enhanced access to transit for 12 persons with disabilities 670,000 13 (Base Project Allocation - $603,000) 14 (Design and Contingencies - $67,000) 15 (iv) Provide for construction of a multilevel 16 parking structure and pedestrian overpass 17 over AMTRAK tracks, to connect the west 18 side of the campus of Villanova to the main 19 campus, with parking for approximately 20 1,000 vehicles and be handicapped 21 accessible 625,000 22 (Base Project Allocation - $562,000) 23 (Design and Contingencies - $63,000) 24 (v) FFY 2002 Section 5309 Transit Enhancement 25 Program, provide additional funding for the 26 acquisition of 104 new rail cars for SEPTA 27 Regional Rail service 2,000,000 28 (Base Project Allocation - $1,800,000) 29 (Design and Contingencies - $200,000) 30 (11) Union and Snyder Transit Authority 20070H1589B3496 - 66 -
1 (i) Construct maintenance facility including 2 equipment and land acquisition 304,000 3 (Base Project Allocation - $273,000) 4 (Design and Contingencies - $31,000) 5 (12) Department of Transportation 6 (i) Provide for rail passenger improvements 7 across this Commonwealth including matching 8 funds for the Keystone Corridor Federal 9 funding 15,000,000 10 (Base Project Allocation - $13,500,000) 11 (Design and Contingencies - $1,500,000) 12 (ii) Provide for Intercity Bus Capital 13 Assistance Intermodal Projects and ADA 14 related facilities/equipment improvements 2,000,000 15 (Base Project Allocation - $1,800,000) 16 (Design and Contingencies - $200,000) 17 (b) Rural and intercity rail.--Additional capital projects 18 in the category of transportation assistance projects for rural 19 and intercity rail service projects to be constructed or with 20 respect to which an interest is to be acquired by the Department 21 of Transportation, its successors or assigns and to be financed 22 by the incurring of debt are hereby itemized, together with 23 their respective estimated financial costs, as follows: 24 Total 25 Project 26 Project Allocation 27 (1) ALLEGHENY COUNTY <-- 28 (I) US STEEL MON VALLEY TRANSPORTATION 29 ASSISTANCE PROJECT, INCLUDING 30 REHABILITATION AND REPLACEMENT OF RAIL 20070H1589B3496 - 67 -
1 INFRASTRUCTURE TO MAINTAIN CAPACITY AND
2 OPERATING CAPABILITY, RECONSTRUCTION OF
3 CULVERTS AND DITCHES ON PROPERTY AND
4 ENHANCEMENT OF TRACKS TO ACCOMMODATE
5 HEAVIER CARS 10,000,000
6 (1.1) ARMSTRONG COUNTY
7 (I) RECONSTRUCTION OF AN EIGHT-MILE SPUR OF
8 RAILROAD IN BETHEL TOWNSHIP 5,000,000
9 (1) (1.2) Allegheny Valley Railroad <--
10 (i) P&W Subdivision Phase II railroad
11 infrastructure rehabilitation and capacity
12 improvements, including track, roadbed,
13 bridges and grade crossings from MP 322 to
14 MP 326 and from MP 1 to MP 31 in Allegheny
15 and Butler Counties 2,860,000
16 (Base Project Allocation - $2,600,000)
17 (Design and Contingencies - $260,000)
18 (ii) W&P Subdivision Phase II railroad
19 infrastructure rehabilitation and capacity
20 improvements, including track, roadbed,
21 bridges and grade crossings from MP 4 to MP
22 39 in Allegheny and Washington Counties 2,530,000
23 (Base Project Allocation - $2,300,000)
24 (Design and Contingencies - $230,000)
25 (iii) Glenwood Yard new and rebuilt yard
26 tracks, capacity improvements, safety
27 improvements and rail infrastructure
28 rehabilitation, including track, roadbed,
29 bridges and grade crossings in Allegheny
30 County 4,840,000
20070H1589B3496 - 68 -
1 (Base Project Allocation - $4,400,000)
2 (Design and Contingencies - $440,000)
3 (IV) CONSTRUCTION, INFRASTRUCTURE AND OTHER <--
4 RELATED COSTS FOR REHABILITATION AND
5 REPLACEMENT OF RAIL INFRASTRUCTURE FOR THE
6 U.S. STEEL MON VALLEY WORKS FACILITIES 10,000,000
7 (1.1) (1.3) BEAVER COUNTY <--
8 (I) CONSTRUCTION, INFRASTRUCTURE AND OTHER
9 RELATED COSTS FOR ALIQUIPPA ETHANOL, LLC,
10 FACILITY 6,000,000
11 (2) Buffalo and Pittsburgh Railroad
12 (i) Rehabilitate mainline track in Armstrong,
13 Clearfield, Indiana and Jefferson Counties,
14 from Kittanning to Dubois and Punxsutawney
15 to Homer City with work to include tie and
16 rail replacement, surfacing, bridge repair,
17 switch, road crossing, signal,
18 communication and any other related work 5,000,000
19 (2.1) ALTOONA BLAIR COUNTY DEVELOPMENT <--
20 CORPORATION
21 (I) REHABILITATION OF THE BEDFORD SECONDARY
22 LINE IN BLAIR COUNTY FROM HOLLIDAYSBURG TO
23 THE WALTER BUSINESS PARK, INCLUDING
24 ENGINEERING DESIGN, CONSTRUCTION AND
25 IMPROVEMENT UPGRADES 2,000,000
26 (2.2) BUCKS COUNTY TRANSPORTATION MANAGEMENT
27 ASSOCIATION
28 (I) REHABILITATION AND IMPROVEMENTS ALONG THE
29 BETHLEHEM BRANCH FROM LANSDALE TO
30 BUCKS/LEHIGH COUNTY BORDER, INCLUDING
20070H1589B3496 - 69 -
1 PROPERTY ACQUISITION, ENGINEERING AND 2 INFRASTRUCTURE STABILIZATION 12,000,000 3 (2.3) DELAWARE AND HUDSON RAILWAY COMPANY <-- 4 (I) DEVELOPMENT OF A BULK TERMINAL/TRANSLOAD 5 FACILITY IN SUSQUEHANNA COUNTY, INCLUDING 6 LAND ACQUISITION, SITE PREPARATION, 7 GRADING, RAIL, TIES, BALLAST, SIGNALS, 8 CUSTOMER SIDINGS, CROSSINGS AND OTHER 9 RELATED MATERIALS 5,000,000 10 (3) CAMBRIA, CLEARFIELD AND INDIANA COUNTIES <-- 11 (I) CONSTRUCTION, INFRASTRUCTURE AND OTHER 12 RELATED COSTS FOR THE CLEARFIELD CLUSTER 3,000,000 13 (3) (3.1) Centre County <-- 14 (i) Construction and other costs related to 15 the SEDA Welded Rail Project Phase IV - 16 Sayers Dam in Liberty Howard Boggs 17 Township 800,000 18 (3.1) (3.2) CLINTON COUNTY <-- 19 (I) IMPROVEMENT TO RAILCAR FACILITY AT RENOVO 20 INDUSTRIAL PARK TO ENHANCE PRODUCTION, 21 INCLUDING UTILITY IMPROVEMENTS, RAIL 22 IMPROVEMENTS AND BUILDING RENOVATION AND 23 IMPROVEMENTS 3,000,000 24 (3.2) (3.3) DELAWARE AND HUDSON RAILWAY COMPANY <-- 25 (I) MAINTAIN AND CONSTRUCT RAIL SIDINGS TO <-- 26 FACILITATE INCREASING FREIGHT VOLUMES AND 27 IMPROVE SYSTEM CAPACITY FROM PORT OF 28 PHILADELPHIA TO NEW YORK STATE 8,800,000 29 (II) UPGRADE AND INSTALL SIGNAL AND 30 COMMUNICATIONS SYSTEMS 5,225,000 20070H1589B3496 - 70 -
1 (III) REHABILITATE HONEY POT YARD RAIL 2 INFRASTRUCTURE IN LUZERNE COUNTY TO SERVE 3 CUSTOMERS WITHIN INDUSTRIAL PARK 3,300,000 4 (IV) RECONSTRUCT RAIL INFRASTRUCTURE IN 5 SUSQUEHANNA COUNTY TO PROVIDE SERVICE TO 6 RAIL/TRUCK TRANSFER FACILITY AND 7 DISTRIBUTION CENTER 3,575,000 8 (I) RECONSTRUCT RAIL INFRASTRUCTURE IN <-- 9 SUSQUEHANNA COUNTY TO PROVIDE SERVICE TO 10 RAIL AND TRUCK TRANSFER FACILITY AND 11 DISTRIBUTION CENTER 3,575,000 12 (BASE PROJECT ALLOCATION - $3,250,000) 13 (DESIGN AND CONTINGENCIES - $325,000) 14 (II) MAINTAIN AND CONSTRUCT RAIL SIDINGS TO 15 FACILITATE INCREASING FREIGHT VOLUMES AND 16 IMPROVE SYSTEM CAPACITY FROM PORT OF 17 PHILADELPHIA TO NEW YORK STATE 8,800,000 18 (BASE PROJECT ALLOCATION - $8,000,000) 19 (DESIGN AND CONTINGENCIES - $800,000) 20 (III) REHABILITATE HONEY POT YARD RAIL 21 INFRASTRUCTURE IN LUZERNE COUNTY TO SERVE 22 CUSTOMERS WITHIN INDUSTRIAL PARK 3,300,000 23 (BASE PROJECT ALLOCATION - $3,000,000) 24 (DESIGN AND CONTINGENCIES - $300,000) 25 (IV) UPGRADE AND INSTALL SIGNAL AND 26 COMMUNICATIONS SYSTEMS ON DELAWARE AND 27 HUDSON RAILWAY 5,225,000 28 (BASE PROJECT ALLOCATION - $4,750,000) 29 (DESIGN AND CONTINGENCIES - $475,000) 30 (V) DEVELOPMENT OF A BULK TERMINAL/TRANSLOAD 20070H1589B3496 - 71 -
1 FACILITY IN SUSQUEHANNA COUNTY, INCLUDING 2 LAND ACQUISITION, SITE PREPARATION, 3 GRADING, RAIL, TIES, BALLAST, SIGNALS, 4 CUSTOMER SIDINGS, CROSSINGS AND OTHER 5 RELATED MATERIALS 5,000,000 6 (3.3) (3.4) ERIE COUNTY <-- 7 (I) INFRASTRUCTURE, CONSTRUCTION AND OTHER 8 RELATED COSTS FOR RAIL EXPANSION AT THE 9 FORMER INTERNATIONAL PAPER SITE CONSISTING 10 OF CONSTRUCTION OF TWO RAIL BRIDGES AND NEW 11 RAIL CONSTRUCTION 5,000,000 12 (II) CONSTRUCTION AND RAIL EXPANSION AT 13 MOUNTFORT TERMINAL 750,000 14 (3.4) FAYETTE COUNTY <-- 15 (I) UPGRADE AND EXPAND RAIL ACCESS TO 16 ALTERNATIVE ENERGY DEVELOPMENT SITE NEAR 17 UNIONTOWN FOR TRI STATE BIOFUELS SITE, 18 INCLUDING NEW RAIL SPUR, SWITCHES AND OTHER 19 RAIL INFRASTRUCTURE MATERIALS 1,650,000 20 (BASE PROJECT ALLOCATION - $1,500,000) 21 (DESIGN AND CONTINGENCIES - $150,000) 22 (3.5) (3.4) (3.5) KISKI JUNCTION RAILROAD <-- 23 (I) CONSTRUCTION OF NINE-MILE EXTENSION NORTH 24 ALONG EASTERN SHORE OF ALLEGHENY RIVER FROM 25 SCHENLEY TO CROOKED CREEK ON FORMER CONRAIL 26 RAILBED 5,400,000 27 (3.6) (3.5) (3.6) LACKAWANNA COUNTY <-- 28 (I) PENNSYLVANIA NORTHEAST REGIONAL RAILROAD 29 AUTHORITY 30 (A) PURCHASE AND INSTALLATION OF MATERIALS 20070H1589B3496 - 72 -
1 NECESSARY FOR THE TRACKAGE AND SPURS TO
2 PROVIDE RAIL ACCESS AND INFRASTRUCTURE
3 TO THE NEW ETHANOL PRODUCTION FACILITY
4 IN MAYFIELD AND CARBONDALE 2,200,000
5 (B) PURCHASE AND INSTALL MATERIALS
6 NECESSARY FOR THE UPGRADING, REBUILDING
7 AND REHABILITATION OF THE 18-MILE
8 CARBONDALE MAINLINE BETWEEN MOOSIC AND
9 CARBONDALE 1,825,000
10 (3.6) (3.7) TRI STATE BIOFUELS <--
11 (I) UPGRADE AND EXPAND RAIL ACCESS TO
12 ALTERNATIVE ENERGY DEVELOPMENT SITE NEAR
13 UNIONTOWN FOR TRI STATE BIOFUELS SITE,
14 INCLUDING NEW RAIL SPUR, SWITCHES AND OTHER
15 RAIL INFRASTRUCTURE MATERIALS 1,650,000
16 (BASE PROJECT ALLOCATION - $1,500,000)
17 (DESIGN AND CONTINGENCIES - $150,000)
18 (4) Lawrence County
19 (i) Acquisition, construction, infrastructure
20 and other related costs for reconstruction
21 of rail lines in Ellwood Borough 10,000,000
22 (5) Lehigh Valley Rail Management
23 (i) Construct access and storage tanks and
24 rehabilitate track within and around the
25 Bethlehem Commerce Center 3,500,000
26 (6) Luzerne County
27 (i) Acquisition, construction, infrastructure
28 and other related costs for Whitney Point
29 rail infrastructure project in Luzerne
30 Township 5,000,000
20070H1589B3496 - 73 -
1 (II) CENTER POINTE WEST RAIL PROJECT 400,000 <-- 2 (6.1) LYCOMING COUNTY <-- 3 (I) CONSTRUCTION OF RAIL SPURS AND RELATED 4 TRACK WORK TO PROVIDE RAIL SERVICE TO 5 INDUSTRIAL SITES FOR THE EXPANSION OF THE 6 MUNCY INDUSTRIAL PARK IN MUNCY AND MUNCY 7 CREEK TOWNSHIPS, INDUSTRIAL PROPERTIES 8 CORPORATION 3,000,000 9 (6.1) (6.2) MERCER COUNTY <-- 10 (I) UPDATE RAIL LINE AND CREATE A RAIL SIDING 11 AT THE MEADVILLE LINE OF NORFOLK AND 12 SOUTHERN RAILWAY IN SHARPSVILLE 1,000,000 13 (6.2) (6.3) MONROE COUNTY <-- 14 (I) PENNSYLVANIA NORTHEAST REGIONAL RAILROAD 15 AUTHORITY 16 (A) ACQUISITION AND REHABILITATION OF 17 10.6-MILE RAIL TRACK LINE RUNNING FROM 18 ANALOMINK TO THE DELAWARE WATER GAP 19 FROM NORFOLK SOUTHERN 1,500,000 20 (6.3) (6.4) MONTGOMERY COUNTY <-- 21 (I) REHABILITATION OF STONEY CREEK BRANCH FROM 22 NORRISTOWN TO LANSDALE, INCLUDING A NEW 23 SIDE TRACK TO LANSDALE WAREHOUSE AND 24 INCREASED CAPACITY AT LANSDALE YARD 12,000,000 25 (II) INFRASTRUCTURE IMPROVEMENTS, <-- 26 REHABILITATION AND OTHER COSTS RELATED TO 27 THE CONSTRUCTION OF A 250-FOOT RAIL SPUR 28 EXTENSION AND RAIL SIDE SILO, REBUILDING OF 29 A RAIL CAR UNLOADING SYSTEM AND OTHER 30 RENOVATIONS AT THE CUSTOM PROCESSING 20070H1589B3496 - 74 -
1 SERVICES FACILITIES 800,000
2 (6.5) NORTHAMPTON COUNTY
3 (I) CONSTRUCTION, INFRASTRUCTURE AND OTHER
4 RELATED COSTS FOR THE FORKS BUSINESS CENTER
5 RAIL PROJECTS 1,000,000
6 (7) (6.5) (6.6) Northumberland County <--
7 (i) Infrastructure and other related costs to
8 extend rail service to the SEEDCO
9 Industrial Park in Coal Township 3,500,000
10 (II) UPGRADE OF RAIL LINE, INCLUDING <--
11 INFRASTRUCTURE AND OTHER RELATED
12 IMPROVEMENTS FOR THE PROVISION OF RAIL
13 SERVICE FOR THE SUNPOINT RENEWABLE ENERGY
14 PROJECT 2,000,000
15 (7) PHILADELPHIA COUNTY <--
16 (I) REHABILITATION OF RAIL LINES AND
17 INFRASTRUCTURE IMPROVEMENTS 10,000,000
18 (7.1) PITTSBURGH AND OHIO CENTRAL RAILROAD
19 (I) INFRASTRUCTURE IMPROVEMENTS IN ALLEGHENY
20 COUNTY 5,225,000
21 (II) INFRASTRUCTURE IMPROVEMENTS IN ALLEGHENY
22 AND WASHINGTON COUNTIES 4,400,000
23 (III) CONSTRUCTION PROJECTS IN ALLEGHENY,
24 BEAVER AND WASHINGTON COUNTIES 10,100,000
25 (IV) CONSTRUCTION PROJECTS IN BEAVER,
26 WASHINGTON AND ALLEGHENY COUNTIES 11,550,000
27 (7.2) READING BLUE MOUNTAIN AND NORTHERN RAILROAD
28 (I) TRACK REHABILITATION ON MAINLINE AND
29 BRANCHLINES TO SUPPORT INCREASED CAR
30 WEIGHTS AND INCREASED BUSINESS IN DISTRICT
20070H1589B3496 - 75 -
1 4 IN LUZERNE, LACKAWANNA, CARBON AND
2 WYOMING COUNTIES 4,500,000
3 (II) REHABILITATION OF C&H BRANCH FROM DELANO
4 JUNCTION TO JEDDO COAL FACILITY IN HAZLETON
5 FOR NEW INTERMODAL, DREDGE, COAL AND OTHER
6 BUSINESS IN LUZERNE COUNTY 3,200,000
7 (III) REHABILITATION OF TRACK IN CRESTWOOD
8 INDUSTRIAL PARK, INCLUDING EXTENDING AND
9 BUILDING TRACKS IN PENOBSCOT YARD IN
10 LUZERNE COUNTY 2,400,000
11 (IV) CONSTRUCTION OF NEW RUNAROUND, SIDING AND
12 ASSOCIATED SWITCHES FOR A NEW INTERCHANGE
13 LOCATION IN NESQUEHONING IN CARBON COUNTY 1,700,000
14 (V) PURCHASE OF NEW OPEN TOP AND COVERED
15 HOPPER CARS 12,000,000
16 (VI) REHABILITATION OF RAILROAD BRIDGES,
17 CULVERTS AND OTHER INFRASTRUCTURE BETWEEN
18 WHITE HAVEN AND SCRANTON IN LUZERNE COUNTY 1,000,000
19 (VII) CONSTRUCTION OF RUNAROUND AND EXTENSION
20 OF TRACK IN THE SCRANTON AREA 2,000,000
21 (7.1) (7.3) Rosebud Mining Railroad Expansion <--
22 (i) Extension of Rosebud Mining Railroad line
23 in Bethel Township 5,000,000
24 (Base Project Allocation - $5,000,000)
25 (7.4) SEDA-COG JOINT RAIL AUTHORITY <--
26 (I) UPGRADE 11 MILES OF THE MAIN LINE FROM MT.
27 EAGLE TO EAGLEVILLE, CENTRE COUNTY, WITH
28 CONTINUOUS WELDED RAIL AND OTHER TRACK
29 IMPROVEMENTS 3,300,000
30 (II) CONSTRUCTION OF A 5,500-FOOT RUNAROUND
20070H1589B3496 - 76 -
1 TRACK ALONG THE MAIN LINE NEAR MILESBURG, 2 CENTRE COUNTY 1,300,000 3 (III) CONSTRUCT RAIL SPUR AND RELATED TRACK 4 WORK TO PROVIDE RAIL SERVICE TO THE SEEDCO 5 INDUSTRIAL PARK IN MT. CARMEL TOWNSHIP, 6 NORTHUMBERLAND COUNTY 2,800,000 7 (7.4) (7.5) SNYDER COUNTY <-- 8 (I) RAIL IMPROVEMENTS TO THE SUNBURY 9 GENERATION STATION, INCLUDING TRACK, 10 CONSTRUCTION OF NEW RAIL STACKOUT 11 FACILITIES AND RAIL DUMPER UPGRADES, 12 INCLUDING ENCLOSING THE FACILITY 6,994,000 13 (7.6) STOURBRIDGE RAILROAD COMPANY <-- 14 (I) INFRASTRUCTURE, CONSTRUCTION AND 15 REHABILITATION OF 23 MILES OF RAILROAD 16 LINE, INCLUDING TRACK, TIES, RAIL, BALLAST 17 AND SWITCHES BETWEEN HONESDALE, WAYNE 18 COUNTY, AND LACKAWAXEN, PIKE COUNTY, 19 INCLUDING THE CONSTRUCTION OF A CONNECTING 20 RAILROAD SPUR AND AUXILIARY RAILROAD 21 INFRASTRUCTURE INTO AN INDUSTRIAL COMPLEX 22 IN WAYNE COUNTY 9,000,000 23 (7.5) (7.6) (7.7) WASHINGTON COUNTY <-- 24 (I) PENN RIDGE COAL COMPANY, LLC, CONSTRUCT 25 NEW SIDING AND LOADING FACILITY FOR NEW 26 COAL MINE COMPLEX NEW NEAR AVELLA, <-- 27 INCLUDING SURFACE PREPARATIONS, RAILS, TIES 28 AND OTHER RELATED RAIL INFRASTRUCTURE 5,500,000 29 (BASE PROJECT ALLOCATION - $5,000,000) 30 (DESIGN AND CONTINGENCIES - $500,000) 20070H1589B3496 - 77 -
1 (7.6) (7.7) (7.8) WESTERN NEW YORK AND <--
2 PENNSYLVANIA RAILROAD, LLC
3 (I) UPGRADE SIGNALS ON THE BUFFALO MAIN LINE
4 FROM STATE LINE TO DRIFTWOOD IN MCKEAN AND
5 CAMERON COUNTIES, INCLUDING PLANNING,
6 ENGINEERING AND CONTINGENCIES 200,000
7 (II) REHABILITATION OF THE BUFFALO MAIN LINE
8 FROM STATE LINE TO DRIFTWOOD IN MCKEAN AND
9 CAMERON COUNTIES, INCLUDING THE REPLACEMENT
10 OF CROSSTIES AND TRACK SURFACING 500,000
11 (III) REHABILITATION OF THE OIL CITY BRANCH
12 FROM MEADVILLE TO ROUSEVILLE IN CRAWFORD,
13 MERCER AND VENANGO COUNTIES, INCLUDING THE
14 REPLACEMENT OF CROSSTIES, TRACK SURFACING,
15 PLANNING AND CONTINGENCIES 1,667,000
16 (IV) REHABILITATION OF THE MEADVILLE-HORNELL
17 MAIN LINE FROM MEADVILLE TO STATE LINE IN
18 CRAWFORD, ERIE AND WARREN COUNTIES,
19 INCLUDING CROPPING AND WELDING OF RAIL,
20 TIES AND SURFACING 6,667,000
21 (V) REHABILITATION OF THE FARMERS VALLEY
22 BRANCH FROM ELDRED TO FARMERS VALLEY IN
23 MCKEAN COUNTY, INCLUDING THE REPLACEMENT OF
24 CROSSTIES, TRACK SURFACING, PLANNING AND
25 CONTINGENCIES 333,000
26 (8) Westmoreland County
27 (i) Construction and other related costs for
28 the Norfolk Southern Commuter Rail Project 30,000,000
29 (ii) Development of the Alle-Kiski Commuter
30 Rail Project 3,000,000
20070H1589B3496 - 78 -
1 (9) Westmoreland County Industrial Development 2 Corporation 3 (i) Mount Pleasant Subdivision rail 4 infrastructure rehabilitation and capacity 5 improvements, including track, roadbed, 6 bridges and grade crossings from MP 0 to MP 7 15 in Westmoreland and Fayette Counties 2,860,000 8 (Base Project Allocation - $2,600,000) 9 (Design and Contingencies - $260,000) 10 (ii) Radebaugh Subdivision rail infrastructure 11 rehabilitation and capacity improvements, 12 including track, roadbed, bridges and grade 13 crossings from MP 0 to MP 18 in 14 Westmoreland County 2,640,000 15 (Base Project Allocation - $2,400,000) 16 (Design and Contingencies - $240,000) 17 (iii) Development of new yard track structure 18 and rail infrastructure rehabilitation and 19 capacity improvements, including track, 20 roadbed, bridges and grade crossings within 21 Westmoreland Rail Freight Terminal in 22 Westmoreland County 1,540,000 23 (Base Project Allocation - $1,400,000) 24 (Design and Contingencies - $140,000) 25 (10) WHEELING AND LAKE ERIE RAILWAY <-- 26 (I) REHABILITATE SEGMENTS OF THE MAIN LINE, 27 INCLUDING RAILS, TIES, BALLAST, GRADING, 28 SWITCHES, CROSSINGS AND BRIDGES IN 29 ALLEGHENY AND WASHINGTON COUNTIES 10,100,000 30 (II) REHABILITATE TIES, BALLAST, RAILS, 20070H1589B3496 - 79 -
1 CROSSINGS, BRIDGES AND SWITCHES IN FAYETTE 2 AND WESTMORELAND COUNTIES 10,100,000 3 (III) CONSTRUCT AND REHABILITATE NEW AND 4 EXISTING CUSTOMER SIDINGS IN ALLEGHENY, 5 WASHINGTON, FAYETTE AND WESTMORELAND 6 COUNTIES, INCLUDING SWITCHES, SIGNALS, 7 RAILS, TIES, BALLAST AND OTHER RELATED 8 MATERIALS 7,700,000 9 (IV) UPGRADE BRIDGES AND TUNNELS IN 10 WESTMORELAND, FAYETTE, WASHINGTON AND 11 ALLEGHENY COUNTIES 22,000,000 12 (c) Air transportation.--Additional capital projects in the 13 category of transportation assistance projects for air 14 transportation service to which an interest is to be acquired by 15 the Department of Transportation, its successors or assigns and 16 to be financed by the incurring of debt are hereby itemized, 17 together with their respective estimated financial costs, as 18 follows: 19 Total 20 Project 21 Project Allocation 22 (1) Allegheny County 23 (i) Allegheny County Airport Authority 24 (A) Upgrade to Allegheny County Airport 25 Terminal and surrounding runways in 26 West Mifflin Borough 500,000 <-- 27 WEST MIFFLIN BOROUGH 5,000,000 <-- 28 (B) SITE AND INFRASTRUCTURE IMPROVEMENTS 1,000,000 <-- 29 (1.1) BUCKS COUNTY 30 (I) QUAKERTOWN AIRPORT 20070H1589B3496 - 80 -
1 (A) DESIGN, SITE WORK, INFRASTRUCTURE AND 2 CONSTRUCTION OF A NEW FUEL SYSTEM 400,000 3 (1.2) CLEARFIELD COUNTY <-- 4 (I) CLEARFIELD-LAWRENCE TOWNSHIP AIRPORT 5 (A) CONSTRUCTION, INFRASTRUCTURE AND OTHER 6 RELATED COSTS FOR AIRPORT IMPROVEMENTS 1,500,000 7 (2) (1.3) Clinton County <-- 8 (i) William T Piper Memorial Airport 9 (A) Construction, redevelopment and other 10 costs related to the Airport Hangar <-- 11 Rehabilitation and Construction Project 12 in Lock Haven Borough 500,000 13 COSTS RELATED TO HANGAR RENOVATIONS AND <-- 14 OTHER AIRPORT IMPROVEMENTS 500,000 15 (2) ERIE COUNTY 16 (I) ERIE INTERNATIONAL AIRPORT 17 (A) ACQUISITION, CONSTRUCTION, 18 INFRASTRUCTURE, REDEVELOPMENT AND OTHER 19 RELATED COSTS FOR THE ERIE 20 INTERNATIONAL AIRPORT RUNWAY EXTENSION 10,000,000 21 (2.1) Indiana County 22 (i) Jimmy Stewart Airport 23 (A) Acquisition, related infrastructure 24 and construction of an access road and 25 hangars at the Jimmy Stewart Airport 2,000,000 26 (Base Project Allocation - $2,000,000) 27 (2.2) LANCASTER COUNTY <-- 28 (I) LANCASTER AIRPORT AUTHORITY 29 (A) SITE DEVELOPMENT AND CONSTRUCTION OF 30 T-HANGAR AND OFFICES 1,000,000 20070H1589B3496 - 81 -
1 (B) SITE DEVELOPMENT AND CONSTRUCTION OF 2 CORPORATE HANGAR AND OFFICES 2,000,000 3 (C) DESIGN, SITE WORK AND CONSTRUCTION TO 4 REHABILITATE T/W'S FOXTROT AND MIKE 2,000,000 5 (3) Lehigh County 6 (i) Lehigh Valley International Airport 7 (A) Provide for the economic development 8 and safety enhancement at the airport 5,000,000 9 (Base Project Allocation - $4,500,000) 10 (Design and Contingencies - $500,000) 11 (4) Luzerne County 12 (i) Hazle Township 13 (A) Acquisition, construction, 14 infrastructure and other related costs 15 for the development of a cargo airport 250,000,000 16 (4.1) LYCOMING COUNTY <-- 17 (I) WILLIAMSPORT REGIONAL AIRPORT 18 (A) CONSTRUCTION OF A FUEL FARM AND RUNWAY 19 APRON 500,000 20 (4.1) (4.2) Monroe County <-- 21 (i) Pocono Mountains Municipal Airport 22 (A) Runway expansion at the Pocono 23 Mountains Municipal Airport 1,000,000 24 (Base Project Allocation - $1,000,000) 25 (4.3) MONTGOMERY COUNTY <-- 26 (I) POTTSTOWN MUNICIPAL AIRPORT 27 (A) ENGINEERING, PLANNING, CONSTRUCTION 28 AND OTHER RELATED COSTS FOR THE 29 CONSTRUCTION OF 40 NEW HANGAR SLOTS 2,500,000 30 (4.3) (4.4) Venango County <-- 20070H1589B3496 - 82 -
1 (i) Venango Regional Airport 2 (A) Infrastructure and construction of a 3 corporate hangar facility 300,000 4 (5) Washington County 5 (I) NORTH FRANKLIN TOWNSHIP <-- 6 (A) AERIAL RIGHT-OF-WAY FOR ILS 7 GLIDESCOPE 500,000 8 (i) (II) South Franklin Township <-- 9 (A) Construction, infrastructure and other 10 related costs for the Washington County 11 Airport infrastructure project 1,000,000 12 (B) Acquisition, construction, 13 infrastructure and other related costs 14 for the Washington County Airport 15 expansion 2,000,000 16 Section 6. Itemization of redevelopment assistance capital 17 projects. 18 (1) Adams County 19 (i) County projects (Reserved) <-- 20 (I) COUNTY PROJECTS <-- 21 (A) RENOVATIONS OF THE COLUMBIA GAS 22 BUILDING TO ACCOMMODATE A HOMELESS 23 SHELTER IN GETTYSBURG, SOUTH CENTRAL 24 COMMUNITY ACTION PROGRAMS 300,000 25 (B) LAND ACQUISITION, INFRASTRUCTURE AND <-- 26 CONSTRUCTION OF A NEW EMERGENCY 27 SERVICES BUILDING FOR THE SOUTHEASTERN 28 ADAMS VOLUNTEER EMERGENCY SERVICES 29 (SAVES) 1,000,000 30 (II) ADAMS COUNTY ECONOMIC DEVELOPMENT <-- 20070H1589B3496 - 83 -
1 CORPORATION
2 (A) ACQUISITION, INFRASTRUCTURE AND OTHER
3 RELATED COSTS, INCLUDING A TARGET SITE
4 ASSESSMENT FOR A NEW BUSINESS PARK
5 ALONG THE U.S. ROUTE 15 CORRIDOR 10,000,000
6 (III) ADAMS COUNTY HISTORICAL SOCIETY
7 (A) RENOVATIONS, REHABILITATION AND OTHER
8 RELATED COSTS FOR REPAIRS AND UPGRADES,
9 INCLUDING ADA RESTROOMS AND ELEVATOR TO
10 THE HISTORICAL SCHMUCKER HALL OF THE
11 LUTHERAN THEOLOGICAL SEMINARY AT
12 GETTYSBURG 4,000,000
13 (ii) (IV) Carroll Valley Borough <--
14 (A) Planning, design and construction of a
15 new Carroll Valley Borough Building 800,000
16 (2) Allegheny County
17 (i) County projects
18 (A) Acquisition, construction and other
19 related costs for the Millvale Marina
20 to Sharpsburg recreation project 1,000,000
21 (B) SITE PREPARATION, INFRASTRUCTURE AND <--
22 CONSTRUCTION RELATED TO A LIFESTYLE
23 CENTER/MIXED-USE DEVELOPMENT LOCATED AT
24 THE KIRWAN HEIGHTS INTERCHANGE OF
25 INTERSTATE 79 10,000,000
26 (C) INFRASTRUCTURE IMPROVEMENTS,
27 CONSTRUCTION AND OTHER COSTS RELATED TO
28 THE ALLEGHENY TOGETHER BUSINESS
29 DISTRICT REVITALIZATION PROJECT 10,000,000
30 (D) CONSTRUCTION, INFRASTRUCTURE <--
20070H1589B3496 - 84 -
1 IMPROVEMENTS AND OTHER COSTS RELATED TO 2 THE CARRIE FURNACE STABILIZATION AND 3 SITE DEVELOPMENT PROJECT IN SWISSVALE 4 AND RANKIN 15,000,000 5 (E) INFRASTRUCTURE, CONSTRUCTION AND OTHER 6 RELATED COSTS TO FORM A REGIONAL CENTER 7 FOR EXCELLENCE IN SCIENCE AND ENERGY, 8 INCLUDING THE PURCHASE OF ELECTRICAL 9 AND MECHANICAL SYSTEMS WITHIN THE 10 PITTSBURGH SUPERCOMPUTING CENTER 1,000,000 11 (F) INFRASTRUCTURE, SITE DEVELOPMENT, 12 CONSTRUCTION AND OTHER RELATED COSTS IN 13 SUPPORT OF SPORTS-RELATED FACILITIES 14 SERVING THE BALDWIN-WHITEHALL SCHOOL 15 DISTRICT 1,000,000 16 (G) CONVERSION OF EXISTING TENNIS AND 17 SWIMMING FACILITY TO MULTIUSE 18 ACTIVITIES CENTER 1,000,000 19 (ii) City of Pittsburgh 20 (A) Acquisition, construction, 21 infrastructure and other related costs 22 for the Morningside Community Center 725,000 23 (B) Construction and other related costs 24 for Pittsburgh Life Sciences expansion 1,000,000 25 (C) Construction, acquisition, 26 infrastructure, redevelopment and other 27 costs related to the revitalization at 28 Perry South 1,500,000 29 (D) Construction, infrastructure, 30 redevelopment and other costs related 20070H1589B3496 - 85 -
1 to Allegheny General Hospital 2 renovations 7,000,000 <-- 3 RENOVATIONS 15,000,000 <-- 4 (E) Construction, acquisition, 5 redevelopment and other costs related 6 to the Center Avenue and Thelma Lovette 7 Family YMCA projects 3,500,000 8 (F) Construction and other related costs 9 for the renovation of the Marian Manor 10 senior health facility 550,000 11 (G) Construction, acquisition, 12 infrastructure, redevelopment, 13 abatement of hazardous materials and 14 other costs related to the Strip 15 District project 6,000,000 16 (H) Construction, infrastructure, 17 redevelopment and other costs 18 associated with the Beechview 19 redevelopment project 3,000,000 20 (I) Construction, infrastructure and other 21 related costs for Strip District 22 improvements 2,000,000 23 (J) Construction, infrastructure and other 24 related costs for Strip District 25 infrastructure improvements 6,000,000 26 (K) Construction and other related costs 27 to renovate Family House University 28 Club 1,500,000 29 (L) Construction, redevelopment and other 30 costs associated with renovation and 20070H1589B3496 - 86 -
1 expansion of the Robert Morris 2 University downtown campus 5,000,000 3 (M) Acquisition, construction and other 4 related costs for UPMC St. Margaret 5 expansion 15,600,000 6 (N) Construction, infrastructure and other 7 related costs to restore and expand 8 Deans Athletic Field community park 588,000 9 (O) Construction, acquisition, 10 infrastructure, redevelopment, 11 abatement of hazardous materials and 12 other costs related to the development 13 of Lawrenceville 10,000,000 14 (P) Construction and other related costs 15 for Riverview Towers renovations 1,800,000 16 (Q) Construction, infrastructure and 17 related costs for the Grandview Scenic 18 Byway project 1,000,000 19 (R) Construction and other related costs 20 for the Brookline Boulevard project 3,900,000 21 (S) Construction and other related costs 22 for the Homewood Brushton Community 23 Development Corporation Sterret-Collier 24 corridor revitalization 5,000,000 25 (T) Construction and other related costs 26 for Route 51 corridor redevelopment and 27 improvement 5,000,000 28 (U) Construction, infrastructure and other 29 related costs for the National Aviary 30 expansion 5,000,000 20070H1589B3496 - 87 -
1 (V) Construction, infrastructure and other 2 related costs for the Urban League of 3 Greater Pittsburgh Charter School 1,500,000 4 (W) Construction and other related costs 5 for the revitalization of Broadway 6 Avenue 7,000,000 7 (X) Acquisition, construction, 8 infrastructure and other related costs 9 for the Pittsburgh Zoo and PPG 10 Aquarium 5,000,000 11 (Y) Acquisition, construction, 12 infrastructure and other related costs 13 for the University of Pittsburgh 14 MEDICAL CENTER/UNIVERSITY OF PITTSBURGH <-- 15 Diabetes Institute 20,000,000 16 (Z) Acquisition, construction, <-- 17 infrastructure and other related costs 18 for the Pittsburgh Zoo and PPG 19 Aquarium 500,000 20 (Z) CONSTRUCTION OF SCIENCE CENTER, <-- 21 COMMUNITY COLLEGE OF ALLEGHENY COUNTY 14,500,000 22 (AA) INFRASTRUCTURE IMPROVEMENTS, 23 RENOVATIONS AND CONSTRUCTION FOR WQED 2,000,000 24 (BB) ACQUISITION, RENOVATIONS AND 25 CONSTRUCTION OF A NEW FACILITY FOR THE 26 PITTSBURGH OPERA 4,500,000 27 (CC) RENOVATIONS AND CONSTRUCTION OF A LOW 28 TO MODERATE INCOME SENIOR HEALTH CARE 29 FACILITY 500,000 30 (DD) ACQUISITION, INFRASTRUCTURE 20070H1589B3496 - 88 -
1 IMPROVEMENTS AND CONSTRUCTION OF THE 2 WOOD STREET COMMONS 3,000,000 3 (EE) EXPANSION, RENOVATION, INFRASTRUCTURE 4 IMPROVEMENTS AND CONSTRUCTION OF THE 5 WESTERN PENNSYLVANIA HOSPITAL CAMPUS 10,000,000 6 (FF) ACQUISITION, RENOVATIONS, 7 INFRASTRUCTURE IMPROVEMENTS AND 8 CONSTRUCTION FOR THE WESTERN 9 PENNSYLVANIA HOSPITAL SCHOOL OF 10 NURSING 10,000,000 11 (GG) INFRASTRUCTURE IMPROVEMENTS AND 12 CONSTRUCTION OF MERCY HOSPITAL 13 DEPARTMENT OF EMERGENCY MEDICINE 14 FACILITY 10,000,000 15 (HH) CONSTRUCTION, INFRASTRUCTURE, 16 REDEVELOPMENT AND OTHER COSTS RELATED 17 TO THE STERLING PLAZA II PROJECT 5,000,000 18 (II) ACQUISITION, CONSTRUCTION, 19 INFRASTRUCTURE AND OTHER COSTS RELATED 20 TO THE IRONWORKERS LOCAL UNION NO. 3 21 EXPANSION PROJECT 1,500,000 22 (JJ) CONSTRUCTION, ACQUISITION, 23 REDEVELOPMENT AND OTHER RELATED COSTS 24 FOR THE STEAMFITTERS LOCAL UNION 449 25 EXPANSION PROJECT 2,500,000 26 (KK) BIOTECHNOLOGY COMMERCIALIZATION 27 PROJECT INCLUDING INFRASTRUCTURE 28 IMPROVEMENTS AND OTHER RELATED COSTS 3,000,000 29 (LL) CONSTRUCTION AND OTHER COSTS RELATED 30 TO THE CENTRALIZATION OF FACILITIES FOR 20070H1589B3496 - 89 -
1 UJF 1,500,000 2 (MM) CONSTRUCTION AND OTHER COSTS RELATED 3 TO THE RENOVATION OF THE LITTLE SISTERS 4 OF THE POOR HEALTH CARE PAVILION 500,000 5 (NN) INFRASTRUCTURE IMPROVEMENTS, 6 CONSTRUCTION AND OTHER COSTS RELATED TO 7 THE MARY SCHENLEY BUILDING RENOVATIONS 8 AT THE WESTERN PENNSYLVANIA SCHOOL FOR 9 BLIND CHILDREN 2,000,000 10 (OO) INFRASTRUCTURE IMPROVEMENTS, 11 CONSTRUCTION AND OTHER COSTS RELATED TO 12 THE GARFIELD HEIGHTS PHASE I 13 REDEVELOPMENT PROJECT 4,000,000 14 (PP) INFRASTRUCTURE IMPROVEMENTS RELATED <-- 15 TO CONSTRUCTION OF THE PROFESSIONAL 16 HOCKEY ARENA 302,000 17 (QQ) ACQUISITION, INFRASTRUCTURE 18 IMPROVEMENTS, CONSTRUCTION AND OTHER 19 COSTS RELATED TO THE EAST LIBERTY 20 COMMERCIAL DISTRICT PROJECT 20,000,000 21 (RR) ACQUISITION, INFRASTRUCTURE 22 IMPROVEMENTS, CONSTRUCTION AND OTHER 23 COSTS RELATED TO THE OAK HILL PHASE II 24 PROJECT 5,000,000 25 (SS) CONSTRUCTION OF SOUTH SHORE 26 RIVERFRONT PARK 1,000,000 27 (TT) ACQUISITION AND CONSTRUCTION OF 28 BUILDING AT CARNEGIE MELLON UNIVERSITY 10,000,000 29 (UU) CONSTRUCTION, INFRASTRUCTURE, 30 REDEVELOPMENT AND OTHER COSTS RELATED 20070H1589B3496 - 90 -
1 TO THE BAKERY SQUARE PROJECT 7,000,000 2 (VV) ACQUISITION, INFRASTRUCTURE 3 IMPROVEMENTS, RENOVATIONS, CONSTRUCTION 4 AND OTHER COSTS RELATED TO THE WOOD 5 STREET COMMONS PROJECT 3,000,000 6 (WW) CONSTRUCTION OF POINT PARK UNIVERSITY 7 AND WOOD STREET CORRIDOR DEVELOPMENT 8 PROJECT 14,000,000 9 (XX) INFRASTRUCTURE IMPROVEMENTS AND 10 CONSTRUCTION OF THE AMERICA'S MUSIC 11 CROSSROADS CENTER 2,000,000 12 (YY) INFRASTRUCTURE IMPROVEMENTS, <-- 13 CONSTRUCTION AND OTHER RELATED COSTS 14 FOR OAKLAND PORTAL PROJECT 15 REDEVELOPMENT 30,000,000 16 (ZZ) INFRASTRUCTURE IMPROVEMENTS, 17 CONSTRUCTION, RENOVATIONS AND OTHER 18 RELATED COSTS FOR HEINZ HALL - 19 PITTSBURGH SYMPHONY ORCHESTRA 10,000,000 20 (AAA) ACQUISITION, INFRASTRUCTURE 21 IMPROVEMENTS, CONSTRUCTION AND OTHER 22 RELATED COSTS FOR THE NORTH AVENUE 23 BLOCK/FEDERAL NORTH PROJECT 10,000,000 24 (BBB) ACQUISITION, INFRASTRUCTURE 25 IMPROVEMENTS, CONSTRUCTION AND OTHER 26 RELATED COSTS FOR THE ROBOTICS DESIGN 27 AND TESTING FACILITY IN HAZELWOOD 6,000,000 28 (CCC) CONSTRUCTION FOR THE PITTSBURGH 29 BALLET THEATRE EXPANSION 3,000,000 30 (DDD) ACQUISITION, INFRASTRUCTURE 20070H1589B3496 - 91 -
1 IMPROVEMENTS, CONSTRUCTION AND OTHER 2 RELATED COSTS FOR THE ARMED FORCES 3 INSTITUTE FOR REGENERATIVE 4 MEDICINE/MCGOWEN INSTITUTE FOR 5 REGENERATIVE MEDICINE PROJECT 30,000,000 6 (EEE) CONSTRUCTION AND OTHER COSTS RELATED 7 TO THE BREW HOUSE REDEVELOPMENT 8 PROJECT 3,000,000 9 (FFF) ACQUISITION, INFRASTRUCTURE 10 IMPROVEMENTS CONSTRUCTION AND OTHER 11 COSTS RELATED TO THE SARAH HEINZ HOUSE 12 EXPANSION PROJECT 500,000 13 (GGG) ACQUISITION, CONSTRUCTION, 14 INFRASTRUCTURE, REDEVELOPMENT AND OTHER 15 RELATED COSTS FOR THE MATTRESS FACTORY 16 EXPANSION PROJECT 250,000 17 (HHH) ACQUISITION, CONSTRUCTION, 18 REDEVELOPMENT AND OTHER COSTS RELATED 19 TO THE 31ST WARD COMMUNITY/RECREATION 20 CENTER 1,250,000 21 (III) ACQUISITION, CONSTRUCTION, 22 INFRASTRUCTURE, REDEVELOPMENT AND OTHER 23 COSTS RELATED TO THE ARMED FORCES 24 INSTITUTE FOR REGENERATIVE MEDICINE AT 25 THE MCGOWAN INSTITUTE 30,000,000 26 (JJJ) ACQUISITION, CONSTRUCTION, 27 INFRASTRUCTURE, REDEVELOPMENT AND OTHER 28 COSTS RELATED TO THE AMALGAMATED 29 TRANSIT UNION LOCAL NO. 85 PROJECT 2,000,000 30 (iii) Baldwin Borough 20070H1589B3496 - 92 -
1 (A) Construction and other related costs
2 to renovate fire department building 500,000
3 (B) INFRASTRUCTURE IMPROVEMENTS AND <--
4 CONSTRUCTION FOR ACADEMY/DBA COMMUNITY
5 SPECIALIST CORP FACILITY 4,000,000
6 (iv) Bethel Park
7 (A) Construction and other related costs
8 for the Bethel Park Community Center
9 expansion 2,500,000
10 (v) Borough of Wilkinsburg
11 (A) Construction and other related costs
12 for the revitalization of commercial
13 corridor including residential housing 5,000,000
14 (B) CONSTRUCTION, REDEVELOPMENT AND OTHER <--
15 COSTS RELATED TO THE SMART APARTMENT
16 PROJECT 1,500,000
17 (V.1) CARNEGIE BOROUGH <--
18 (A) ACQUISITION, CONSTRUCTION,
19 INFRASTRUCTURE, REDEVELOPMENT AND OTHER
20 COSTS RELATED TO THE CARNEGIE BOROUGH
21 BUSINESS DISTRICT REVITALIZATION
22 PROGRAM 10,000,000
23 (V.1) (V.2) CASTLE SHANNON <--
24 (A) CONSTRUCTION, INFRASTRUCTURE,
25 ACQUISITION, REDEVELOPMENT AND OTHER
26 COSTS RELATED TO THE SHANNON STATION
27 TRANSIT VILLAGE 3,000,000
28 (V.3) CITY OF CLAIRTON <--
29 (A) DESIGN, ENGINEERING AND CONSTRUCTION
30 OF US STEEL COGENERATION FACILITY 25,000,000
20070H1589B3496 - 93 -
1 (B) DEMOLITION AND CONSTRUCTION FOR US
2 STEEL COKE OVEN PROJECT 25,000,000
3 (V.4) CITY OF CLAIRTON AND WEST MIFFLIN AND
4 BRADDOCK BOROUGHS
5 (A) CONSTRUCTION AND OTHER RELATED COSTS
6 FOR A NEW COGENERATION FACILITY 25,000,000
7 (B) CONSTRUCTION, ABATEMENT OF HAZARDOUS
8 MATERIALS AND OTHER COSTS RELATED TO
9 THE U.S. STEEL COKE OVEN PROJECT 25,000,000
10 (V.5) CORAOPOLIS BOROUGH
11 (A) ACQUISITION, CONSTRUCTION,
12 INFRASTRUCTURE, REDEVELOPMENT AND OTHER
13 COSTS RELATED TO THE CORAOPOLIS BOROUGH
14 BUSINESS DISTRICT REVIALIZATION PROGRAM 10,000,000
15 (vi) Dravosburg Borough
16 (A) Acquisition, construction and other
17 related costs for the Dravosburg
18 waterfront development 500,000
19 (VI.1) DUQUESNE CITY <--
20 (A) INFRASTRUCTURE IMPROVEMENTS,
21 CONSTRUCTION AND OTHER COSTS RELATED TO
22 THE BURNS HEIGHTS DUQUESNE
23 REVITALIZATION PROJECT 2,000,000
24 (VI.1) (VI.2) BOROUGH OF EDGEWOOD <--
25 (A) COMPLETION OF LINEAR PARK IN EDGEWOOD
26 BOROUGH ADJACENT TO THE PORT AUTHORITY
27 OF ALLEGHENY COUNTY EAST BUSWAY
28 FACILITY 3,600,000
29 (vii) Glassport Borough
30 (A) Construction and other related costs
20070H1589B3496 - 94 -
1 for the municipal building 2 redevelopment 500,000 3 (B) Acquisition, construction and other 4 related costs for demolition and 5 redevelopment of abandoned properties 500,000 6 (viii) Green Tree Borough 7 (A) Construction and other related costs 8 for Aiken Elementary School 9 improvements 500,000 10 (B) Construction and other related costs 11 for the Green Tree Road improvement 12 project 3,000,000 13 (VIII.1) HOMESTEAD BOROUGH <-- 14 (A) INFRASTRUCTURE IMPROVEMENTS, 15 RENOVATIONS AND CONSTRUCTION OF THE 16 HISTORIC HOMESTEAD BAKERY 2,200,000 17 (VIII.2) LIBERTY BOROUGH 18 (A) RENOVATIONS AND INFRASTRUCTURE 19 IMPROVEMENTS TO SOUTH ALLEGHENY 20 MIDDLE/HIGH SCHOOL LIBRARY 1,000,000 21 (ix) Town of McCandless 22 (A) Construction and other related costs 23 for the UPMC Passavant Patient Tower 24 expansion 20,000,000 25 (IX.1) NORTH PARK/MCCANDLESS TOWNSHIP <-- 26 (A) FACILITY UPGRADES AND INFRASTRUCTURE 27 IMPROVEMENTS TO ALLEGHENY COUNTY FIRE 28 TRAINING ACADEMY 1,000,000 29 (x) City of McKeesport 30 (A) Construction, abatement of hazardous 20070H1589B3496 - 95 -
1 materials and other costs associated 2 with the McKeesport Fire Department 3 building project 1,000,000 4 (B) Construction, infrastructure and other 5 costs associated with the Marshall 6 Drive redevelopment project 500,000 7 (C) CONSTRUCTION, REDEVELOPMENT AND OTHER <-- 8 RELATED COSTS FOR THE MCKEESPORT 9 AUBERLE ATHLETIC COMPLEX PROJECT 500,000 10 (X.1) MCKEES ROCKS BOROUGH <-- 11 (A) ACQUISITION, INFRASTRUCTURE 12 IMPROVEMENTS, CONSTRUCTION AND RELATED 13 COSTS FOR CHARTIERS CROSSING DOWNTOWN 14 REVITALIZATION PROJECT 7,000,000 15 (B) REDEVELOPMENT, CONSTRUCTION AND OTHER 16 COSTS RELATED TO A CULTURAL ARTS 17 CENTER 1,500,000 18 (C) CONSTRUCTION AND OTHER RELATED COSTS <-- 19 FOR THE ISLAND STUDIOS PROJECT 250,000 20 (X.2) MONROEVILLE BOROUGH 21 (A) EXPANSION, RENOVATION AND CONSTRUCTION 22 OF SPECTRUM CHARTER SCHOOL 1,000,000 23 (B) EXPANSION, RENOVATION, INFRASTRUCTURE 24 IMPROVEMENTS AND CONSTRUCTION OF 25 FACILITIES FOR THE WESTERN PENNSYLVANIA 26 HOSPITAL - FORBES REGIONAL CAMPUS 10,000,000 27 (C) ACQUISITION, CONSTRUCTION AND OTHER <-- 28 COSTS RELATED TO THE UPMC HEALTHPLEX 29 EAST ADULT OUTPATIENT FACILITY PROJECT 5,000,000 30 (xi) Mt. Lebanon Township 20070H1589B3496 - 96 -
1 (A) Construction and other related costs
2 for the redevelopment of Washington
3 Road business district 2,500,000
4 (B) Construction and other related costs
5 for a transit-oriented development
6 project 1,000,000
7 (C) INFRASTRUCTURE, CONSTRUCTION, <--
8 REHABILITATION AND REDEVELOPMENT OF THE
9 SETON-LA SALLE HIGH SCHOOL ATHLETIC
10 FIELD INTO A STATE-OF-THE-ART MULTIUSE
11 ATHLETIC FACILITY 500,000
12 (D) CONSTRUCTION, INFRASTRUCTURE, <--
13 REDEVELOPMENT AND OTHER COSTS RELATED
14 TO THE SHADY GROVE TRANSIT ORIENTED
15 DEVELOPMENT PROGRAM 500,000
16 (E) CONSTRUCTION, INFRASTRUCTURE,
17 REDEVELOPMENT, ABATEMENT OF HAZARDOUS
18 MATERIALS AND OTHER COSTS RELATED TO
19 THE DENIS THEATRE RENOVATION PROJECT 2,000,000
20 (F) ACQUISITION, CONSTRUCTION,
21 INFRASTRUCTURE AND OTHER COSTS RELATED
22 TO MT. LEBANON PARKS IMPROVEMENT 5,000,000
23 (XI.1) MUNHALL BOROUGH
24 (A) CONSTRUCTION, INFRASTRUCTURE
25 IMPROVEMENTS AND OTHER COSTS RELATED TO
26 THE PUMP HOUSE AND WATER TOWER
27 DEVELOPMENT PROJECT 5,000,000
28 (XI.1) (XI.2) NATRONA HEIGHTS <--
29 (A) EXPANSION, RENOVATION AND CONSTRUCTION
30 AND INFRASTRUCTURE IMPROVEMENTS TO
20070H1589B3496 - 97 -
1 ALLE-KISKI MEDICAL CENTER CAMPUS 10,000,000 2 (XI.2) (XI.3) NEVILLE TOWNSHIP <-- 3 (A) ACQUISITION, INFRASTRUCTURE 4 IMPROVEMENTS, CONSTRUCTION AND OTHER 5 COSTS RELATED TO THE NEVILLE CROSSING 6 REVITALIZATION PROJECT 3,000,000 7 (XI.4) O'HARA TOWNSHIP <-- 8 (A) CONSTRUCTION OF A NEW COMMUNITY CENTER 9 OR RENOVATION OF EXISTING COMMUNITY 10 CENTER, INCLUDING NECESSARY COSTS 1,000,000 11 (XI.3) (XI.5) PINE TOWNSHIP <-- 12 (A) CONSTRUCTION OF A NEW VOLUNTEER FIRE 13 COMPANY FACILITY 2,300,000 14 (XI.4) (XI.6) ROBINSON TOWNSHIP <-- 15 (A) INFRASTRUCTURE IMPROVEMENTS, 16 CONSTRUCTION AND OTHER COSTS RELATED TO 17 THE CARNEGIE MUSEUMS BUILDING AND MUSIC 18 HALL RENOVATION PROJECTS 2,000,000 19 (xii) Fox Chapel Borough and O'Hara Township 20 (A) Acquisition and construction related 21 to redevelopment of CCLA Laure Ann West 22 Memorial Library 1,000,000 23 (XIII) CORAOPOLIS BOROUGH <-- 24 (A) CONSTRUCTION, INFRASTRUCTURE AND OTHER 25 COSTS RELATED TO THE DEVELOPMENT OF A 26 RECREATIONAL STADIUM AND AMENITIES 5,000,000 27 (XIV) MCCANDLESS TOWNSHIP 28 (A) RENOVATION AND REHABILITATION AND 29 TECHNOLOGY UPGRADES TO THE JOHN J. 30 WRIGHT LIBRARY AT LA ROCHE COLLEGE 500,000 20070H1589B3496 - 98 -
1 (XV) PLUM BOROUGH 2 (A) CONSTRUCTION, INFRASTRUCTURE AND OTHER 3 RELATED COSTS FOR A SENIOR HEALTH CARE 4 FACILITY 5,000,000 5 (XVI) PENN HILLS TOWNSHIP 6 (A) INFRASTRUCTURE IMPROVEMENTS AND 7 CONSTRUCTION OF IMANI CHRISTIAN 8 ACADEMY 2,500,000 9 (B) ACQUISITION, CONSTRUCTION, <-- 10 INFRASTRUCTURE AND OTHER RELATED COSTS 11 FOR THE THOMPSON RUN INDUSTRIAL PARK 3,000,000 12 (C) CONSTRUCTION, INFRASTRUCTURE AND OTHER 13 RELATED COSTS FOR ALLEGHENY RIVER 14 BOULEVARD IMPROVEMENTS 1,500,000 <-- 15 BOULEVARD IMPROVEMENTS 4,000,000 <-- 16 (D) ACQUISITION, CONSTRUCTION, 17 INFRASTRUCTURE, REDEVELOPMENT AND OTHER 18 RELATED COSTS FOR THE THOMPSON RUN 19 REDEVELOPMENT PROJECT 2,500,000 20 (XVII) SUMMIT TOWNSHIP 21 (A) INFRASTRUCTURE IMPROVEMENTS, 22 RENOVATIONS AND CONSTRUCTION OF SUMMIT 23 ACADEMY 4,000,000 24 (XVIII) WHITE OAK BOROUGH 25 (A) CONSTRUCTION AND RENOVATIONS OF A 26 WHITE OAK COMMUNITY RECREATION AND 27 SENIOR CITIZEN CENTER 1,500,000 28 (B) CONSTRUCTION OF WHITE OAK HERITAGE <-- 29 PARK COMMUNITY CENTER 1,000,000 30 (C) CONSTRUCTION AND REHABILITATION OF THE 20070H1589B3496 - 99 -
1 WHITE OAK ATHLETIC ASSOCIATION 2 FACILITIES, INCLUDING GYMNASIUM, 3 OFFICES AND COMMUNITY AREA 2,500,000 4 (XIX) REDEVELOPMENT AUTHORITY OF ALLEGHENY <-- 5 COUNTY 6 (A) ACQUISITION, INFRASTRUCTURE, 7 CONSTRUCTION AND OTHER RELATED COSTS 8 FOR THE CONSTRUCTION OF A LIFESPAN - 9 WELLNESS CENTER IN MOON TOWNSHIP 10,000,000 10 (B) ACQUISITION, SITE DEVELOPMENT, 11 CONSTRUCTION AND INFRASTRUCTURE FOR THE 12 DEVELOPMENT OF A RESEARCH AND 13 TECHNOLOGY PARK LOCATED ADJACENT TO 14 INTERSTATE 79 IN SOUTH FAYETTE 15 TOWNSHIP 5,000,000 16 (C) INFRASTRUCTURE, SITE DEVELOPMENT AND <-- 17 OTHER CONSTRUCTION-RELATED COSTS IN 18 SUPPORT OF A MIXED-USE DEVELOPMENT 19 ALONG THE UNIVERSITY BOULEVARD 20 COMMERCIAL DISTRICT 5,000,000 21 (3) Armstrong County 22 (i) County projects (Reserved) 23 (I.1) ARMSTRONG COUNTY INDUSTRIAL DEVELOPMENT <-- 24 AUTHORITY 25 (A) ACQUISITION, INFRASTRUCTURE AND 26 CONSTRUCTION OF THE ARMSTRONG 27 TECHNOLOGY CENTER, A MIXED-USE 28 FACILITY, INCLUDING MANUFACTURING 29 SPACE 2,000,000 30 (ii) City of Parker 20070H1589B3496 - 100 -
1 (A) Land acquisition, site development and
2 construction to support the
3 revitalization of downtown Parker 500,000
4 (iii) East Franklin Township
5 (A) Construction, infrastructure and other
6 related costs for Armstrong County
7 Commons 10,000,000
8 (IV) FORD CITY BOROUGH <--
9 (A) CONSTRUCTION, ACQUISITION AND OTHER
10 NECESSARY COSTS FOR FORD CITY BOROUGH
11 BUILDING/PUBLIC SAFETY BUILDING 250,000
12 (V) KISKIMINETAS TOWNSHIP
13 (A) ACQUISITION, CONSTRUCTION AND OTHER
14 NECESSARY COSTS FOR KISKIMINETAS
15 TOWNSHIP BUILDING 1,000,000
16 (iv) (VI) West Kittanning Borough <--
17 (A) Acquisition of land, demolition and
18 construction of borough building 500,000
19 (VII) WORTHINGTON BOROUGH <--
20 (A) CONSTRUCTION, DEMOLITION AND OTHER
21 NECESSARY COSTS FOR PUBLIC SAFETY
22 BUILDING 500,000
23 (4) Beaver County
24 (i) County projects (Reserved)
25 (A) Acquisition, construction,
26 infrastructure and other related costs
27 for a family services center 3,000,000
28 (B) CONSTRUCTION, ACQUISITION AND OTHER <--
29 NECESSARY COSTS FOR NEW FACILITY TO
30 MANUFACTURE SOAP AND OTHER SIMILAR
20070H1589B3496 - 101 -
1 PRODUCTS 5,000,000
2 (I.1) CITY OF ALIQUIPPA <--
3 (A) INFRASTRUCTURE IMPROVEMENTS AND
4 CONSTRUCTION OF ETHANOL PRODUCTION
5 FACILITY IN THE ALIQUIPPA INDUSTRIAL
6 PARK 6,000,000
7 (I.2) CITY OF BEAVER FALLS
8 (A) CONSTRUCTION AND RENOVATIONS TO THE
9 SBC MINISTRIES, INC., FACILITY 500,000
10 (ii) Center Township
11 (A) Acquisition, construction,
12 infrastructure and other related costs
13 for the Gateway Youth Services Center 3,000,000
14 (iii) Midland Borough
15 (A) Acquisition, construction,
16 infrastructure and other related costs
17 for the Beaver County Industrial
18 Museum 1,500,000
19 (5) Bedford County
20 (i) County projects (Reserved) <--
21 (I) COUNTY PROJECTS <--
22 (A) INFRASTRUCTURE, CONSTRUCTION AND OTHER
23 RELATED COSTS FOR THE BEDFORD MEMORIAL
24 SURGERY CENTER PROJECT AT THE
25 UNIVERSITY OF PITTSBURGH MEDICAL
26 CENTER 5,000,000
27 (ii) West Providence Township
28 (A) Acquisition and construction of
29 Everett Business Center 1,500,000
30 (6) Berks County
20070H1589B3496 - 102 -
1 (i) County projects 2 (A) Carpenter Technology, expansion 3 project, for construction, 4 infrastructure improvements and other 5 related costs for a manufacturing and 6 economic development project 27,000,000 7 (B) LAND ACQUISITION, INFRASTRUCTURE <-- 8 IMPROVEMENTS AND CONSTRUCTION NECESSARY 9 TO MAINTAIN THE COMPETITIVE POSITION OF 10 AN EXISTING BUSINESS ENTITY OR FOR THE 11 DEVELOPMENT OF BUSINESS-READY SITES FOR 12 POTENTIAL BUSINESS TENANTS 1,000,000 13 (C) ACQUISITION, INFRASTRUCTURE <-- 14 IMPROVEMENTS AND CONSTRUCTION FOR 15 STATE-OF-THE-ART FOOD PROCESSING PLANT 16 FOR THE PENNSYLVANIA AGRIBUSINESS 17 INDUSTRY 2,500,000 18 (D) ACQUISITION, INFRASTRUCTURE 19 IMPROVEMENTS AND CONSTRUCTION FOR 20 THOROUGHBRED HORSE TRAINING FACILITY 10,000,000 21 (II) BERN TOWNSHIP 22 (A) ACQUISITION, INFRASTRUCTURE 23 IMPROVEMENTS AND CONSTRUCTION OF THE 24 READING REGIONAL AIRPORT BIOTECH 25 RESEARCH INDUSTRIAL PARK 5,000,000 26 (III) CITY OF READING 27 (A) INFRASTRUCTURE IMPROVEMENTS AND 28 CONSTRUCTION, INCLUDING PARKING, FOR 29 CEDARPAK 5,000,000 30 (B) CONSTRUCTION OF BERKS COMMUNITY 20070H1589B3496 - 103 -
1 FOUNDATION GREEN OFFICE BUILDING AT 3RD 2 AND WASHINGTON STREETS 5,300,000 3 (C) INFRASTRUCTURE IMPROVEMENTS AND 4 CONSTRUCTION OF THE ANGELICA 5 ENVIRONMENTAL CENTER 3,800,000 6 (D) INFRASTRUCTURE IMPROVEMENTS AND 7 CONSTRUCTION OF CITY PARK RECREATIONAL 8 FACILITIES 2,750,000 9 (E) INFRASTRUCTURE IMPROVEMENTS, 10 RENOVATIONS AND CONSTRUCTION OF THE 11 READING PAGODA 2,500,000 <-- 12 READING PAGODA 15,000,000 <-- 13 (F) ACQUISITION, INFRASTRUCTURE 14 IMPROVEMENTS AND CONSTRUCTION FOR 15 SECURITY SYSTEM 1,000,000 16 (G) ACQUISITION, INFRASTRUCTURE 17 IMPROVEMENTS AND CONSTRUCTION FOR THE 18 REDEVELOPMENT OF LAND AND PROPERTIES ON 19 THE EAST SIDE OF THE SCHUYLKILL RIVER 5,000,000 20 (H) ACQUISITION, INFRASTRUCTURE 21 IMPROVEMENTS AND CONSTRUCTION FOR THE 22 REHABILITATION AND DEVELOPMENT OF NORTH 23 READING INDUSTRIAL TRACT 30,000,000 24 (I) INFRASTRUCTURE IMPROVEMENTS AND 25 CONSTRUCTION OF A NEW SCIENCE CENTER 26 FOR ALBRIGHT COLLEGE 7,000,000 27 (J) ACQUISITION, DEMOLITION AND 28 CONSTRUCTION OF BUTTONWOOD, MILTMORE, 29 GORDON AND TULPEHOCKEN STREETS 30 TOWNHOUSE PROJECT 8,000,000 20070H1589B3496 - 104 -
1 (K) ACQUISITION, INFRASTRUCTURE 2 IMPROVEMENTS AND CONSTRUCTION FOR 3 RENOVATIONS OF BUILDINGS IN THE 400 4 BLOCK OF PENN STREET 3,000,000 5 (L) INFRASTRUCTURE IMPROVEMENTS AND 6 CONSTRUCTION TO CONVERT THE LIBERTY 7 FIRE COMPANY TO THE READING AREA 8 FIREFIGHTERS MUSEUM 1,565,000 9 (M) INFRASTRUCTURE IMPROVEMENTS AND 10 CONSTRUCTION OF A NEW ENTRANCE TO 11 ALVERNIA COLLEGE 2,500,000 12 (N) INFRASTRUCTURE IMPROVEMENTS AND 13 CONSTRUCTION FOR AN ADDITION TO THE 14 ALVERNIA COLLEGE HEALTH AND WELLNESS 15 CENTER 6,000,000 16 (O) INFRASTRUCTURE IMPROVEMENTS AND 17 CONSTRUCTION FOR ANGELICA PARK ACCESS 18 AND FIELD AND BUILDINGS REHABILITATION 19 PROJECT 4,000,000 20 (P) INFRASTRUCTURE IMPROVEMENTS AND 21 CONSTRUCTION OF READING AREA COMMUNITY 22 COLLEGE ACADEMIC CLASSROOM 23 INSTRUCTIONAL CENTER 20,000,000 24 (Q) INFRASTRUCTURE IMPROVEMENTS FOR 25 READING HOSPITAL, INCLUDING EQUIPMENT 26 UPGRADES 10,000,000 27 (R) ACQUISITION, INFRASTRUCTURE 28 IMPROVEMENTS AND CONSTRUCTION FOR 29 REDEVELOPMENT OF THE FORMER GARDEN 30 STATE TANNING BUILDING 4,500,000 20070H1589B3496 - 105 -
1 (S) INFRASTRUCTURE IMPROVEMENTS AND 2 CONSTRUCTION OF THE FIRST ENERGY 3 STADIUM 26,000,000 4 (T) ACQUISITION, DEMOLITION, 5 INFRASTRUCTURE IMPROVEMENTS AND 6 CONSTRUCTION OF APARTMENTS AND SHOPS AT 7 3RD AND COURT STREETS 7,000,000 8 (U) ACQUISITION, INFRASTRUCTURE 9 IMPROVEMENTS AND CONSTRUCTION OF 10 CONVENTION CENTER HOTEL AND PARKING 11 GARAGE 62,000,000 12 (V) ACQUISITION, INFRASTRUCTURE 13 IMPROVEMENTS AND CONSTRUCTION FOR THE 14 EXPANSION OF GOGGLE WORKS NO. 2 15 BUILDING FOR A CHILDREN'S MUSEUM AND 16 SCHOOL FOR THE ARTS 7,000,000 17 (W) ACQUISITION, INFRASTRUCTURE 18 IMPROVEMENTS AND CONSTRUCTION OF 7TH 19 AND PENN STREETS OFFICE BUILDING 6,000,000 20 (X) ACQUISITION, DEMOLITION, 21 INFRASTRUCTURE IMPROVEMENTS AND 22 CONSTRUCTION OF SOUTH 8TH STREET 23 SUPERMARKET AND RETAIL SHOP COMPLEX 1,000,000 24 (Y) INFRASTRUCTURE IMPROVEMENTS AND 25 CONSTRUCTION FOR RESTORATION AND 26 RENOVATION OF TREXLER MANSION FOR 27 DANIEL TORRES HISPANIC CENTER 3,000,000 28 (Z) ACQUISITION, INFRASTRUCTURE 29 IMPROVEMENTS, CONSTRUCTION AND OTHER 30 COSTS ASSOCIATED WITH THE BUTTONWOOD 20070H1589B3496 - 106 -
1 STREET BROWNFIELD REHABILITATION 2 PROJECT 2,000,000 3 (AA) INFRASTRUCTURE IMPROVEMENTS AND 4 RENOVATION FOR THE READING PUBLIC 5 MUSEUM 2,500,000 6 (BB) ACQUISITION, INFRASTRUCTURE <-- 7 IMPROVEMENTS, CONSTRUCTION AND OTHER 8 COSTS RELATED TO THE RENOVATION OF 9 BUILDINGS IN THE 400 AND 500 BLOCKS OF 10 PENN STREET 8,000,000 11 (CC) INFRASTRUCTURE IMPROVEMENTS AND 12 CONSTRUCTION OF FORMER RAILROAD BRIDGE 13 AS PART OF A PUBLIC TRAIL, RAAC BRIDGE 14 IMPROVEMENT PROJECT 1,500,000 15 (IV) HAMBURG BOROUGH 16 (A) CONSTRUCTION AND RELATED 17 INFRASTRUCTURE FOR THE HAMBURG AREA 18 HIGH SCHOOL STADIUM PROJECT 500,000 19 (V) KUTZTOWN BOROUGH 20 (A) INFRASTRUCTURE IMPROVEMENTS AND 21 CONSTRUCTION FOR SECURITY UPGRADES FOR 22 THE BOROUGH, INCLUDING PARTS OF 23 KUTZTOWN UNIVERSITY CAMPUS 2,000,000 24 (VI) TOPTON BOROUGH 25 (A) INFRASTRUCTURE IMPROVEMENTS AND 26 CONSTRUCTION FOR THE RENOVATION AND 27 EXPANSION OF TOPTON BOROUGH HALL 1,500,000 28 (VII) WEST READING BOROUGH 29 (A) LAND ACQUISITION AND CONSTRUCTION OF A 30 NEW BOARDWALK TRAIL AT WEST SHORE 20070H1589B3496 - 107 -
1 BOARDWALK 5,000,000 2 (B) ACQUISITION, INFRASTRUCTURE <-- 3 IMPROVEMENTS, CONSTRUCTION AND OTHER 4 COSTS RELATED TO THE GIGGLEWORKS 5 CHILDREN'S MUSEUM 2,000,000 6 (7) Blair County 7 (i) County projects (Reserved) 8 (II) ALTOONA BLAIR COUNTY DEVELOPMENT <-- 9 CORPORATION 10 (A) ACQUISITION, CONSTRUCTION AND 11 REDEVELOPMENT OF DOWNTOWN ALTOONA IN 12 THE VICINITY OF THE AMTRAIN INTERMODAL 13 FACILITY 5,000,000 14 (B) ACQUISITION, INFRASTRUCTURE, 15 CONSTRUCTION AND OTHER COSTS RELATED TO 16 THE DEVELOPMENT OF A MULTIFUNCTIONAL 17 COMPLEX LOCATED AT THE SOUTH ALTOONA 18 BUSINESS PARK 5,500,000 19 (C) LAND ACQUISITION, INFRASTRUCTURE AND 20 CONSTRUCTION OF ACCESS IMPROVEMENTS TO 21 SUPPORT THE REDEVELOPMENT OF THE FORMER 22 HOLLIDAYSBURG CAR SHOP PROPERTY 2,500,000 23 (D) ACQUISITION, INFRASTRUCTURE AND 24 CONSTRUCTION OF THE KETTLE CREEK MIXED- 25 USE DEVELOPMENT IN LOGAN TOWNSHIP 5,000,000 26 (E) LAND ACQUISITION, INFRASTRUCTURE, 27 ENVIRONMENTAL CLEANUP, DESIGN AND 28 CONSTRUCTION OF A BUSINESS PARK ALONG 29 THE I-99 CORRIDOR 4,000,000 30 (F) ACQUISITION, INFRASTRUCTURE, 20070H1589B3496 - 108 -
1 CONSTRUCTION AND REDEVELOPMENT OF A 2 MULTIFUNCTIONAL COMPLEX LOCATED ALONG 3 THE I-99 CORRIDOR WITH EMPHASIS ON THE 4 I-99 ENTERPRISE CAMPUS SITE 4,000,000 5 (G) LAND ACQUISITION, INFRASTRUCTURE, 6 REDEVELOPMENT AND CONSTRUCTION OF A 7 TRANSPORTATION RESEARCH AND EDUCATION 8 CENTER OF EXCELLENCE COMPLEX ALONG THE 9 I-99 CORRIDOR 5,000,000 10 (ii) (III) City of Altoona <-- 11 (A) Acquisition, construction and 12 infrastructure related to the 13 renovation of Mishler Theatre 2,100,000 14 (B) LAND ACQUISITION, DESIGN AND <-- 15 CONSTRUCTION OF A PARKING GARAGE AND 16 TRANSPORTATION CENTER 5,000,000 17 (C) CONSTRUCTION OF A MULTIPURPOSE <-- 18 FACILITY TO INCLUDE PARKING GARAGE, 19 SMALL HOTEL, RETAIL AND OFFICES AT 1400 20 12TH AVENUE 7,500,000 21 (iii) (IV) Logan Township <-- 22 (A) Acquisition, construction, 23 infrastructure and other costs related 24 to the redevelopment of Kettle Creek 25 Mixed-Use Development 5,000,000 26 (8) Bradford County (Reserved) <-- 27 (8) BRADFORD COUNTY <-- 28 (I) COUNTY PROJECTS (RESERVED) 29 (II) CENTRAL BRADFORD PROGRESS AUTHORITY 30 (A) INFRASTRUCTURE, DESIGN, EQUIPMENT AND 20070H1589B3496 - 109 -
1 OTHER RELATED COSTS FOR INFORMATION
2 SYSTEMS AND TECHNOLOGY UPGRADES AT THE
3 TOWANDA MEMORIAL HOSPITAL 1,200,000
4 (9) Bucks County
5 (i) County projects (Reserved) <--
6 (I) COUNTY PROJECTS <--
7 (A) ACQUISITION AND DEMOLITION OF FLOOD-
8 DAMAGED PROPERTIES IN THE OAK TREE
9 SECTION OF BRISTOL TOWNSHIP 500,000
10 (B) RENOVATIONS, CONSTRUCTION AND
11 EXPANSION OF THE HISTORIC MERCER
12 MUSEUM, BUCKS COUNTY HISTORICAL
13 SOCIETY 5,000,000
14 (C) ACQUISITION, RENOVATIONS, CONSTRUCTION
15 AND OTHER RELATED COSTS FOR THE
16 REHABILITATION AND EXPANSION OF THE
17 NETWORK OF VICTIM ASSISTANCE (NOVA)
18 HEADQUARTERS IN JAMISON 1,000,000
19 (D) REHABILITATION AND CONSTRUCTION OF A
20 HEALTH CARE AND DIAGNOSTIC CENTER 4,000,000
21 (E) INFRASTRUCTURE, CONSTRUCTION AND OTHER <--
22 RELATED COSTS FOR THE REDEVELOPMENT OF
23 THE HORIZON CORPORATE CENTER 4,500,000
24 (F) CONSTRUCTION AND RENOVATIONS OF AN
25 INPATIENT MOTHER/BABY UNIT AT THE ST.
26 MARY MEDICAL CENTER 1,000,000
27 (G) CONSTRUCTION AND RENOVATIONS OF AN
28 INPATIENT UNIT AT THE ST. MARY MEDICAL
29 CENTER FOR THE PURPOSES OF CREATING A
30 PRIVATE ROOM MEDICAL-SURGICAL UNIT 1,250,000
20070H1589B3496 - 110 -
1 (H) BUCKS COUNTY COMMUNITY COLLEGE 2 (I) RENOVATIONS AND ADA ACCESSIBILITY 3 IMPROVEMENTS TO A GYMNASIUM 1,000,000 4 (II) RENOVATIONS AND UPGRADES TO THE 5 ROLLINS STUDENT CENTER 1,351,000 6 (III) CONSTRUCTION OF A CLASSROOM AND 7 FACULTY OFFICE BUILDING 8,000,000 8 (ii) Bensalem Township 9 (A) Renovation of the Mack Park recreation 10 complex, including construction 250,000 11 (B) INFRASTRUCTURE, CONSTRUCTION AND OTHER <-- 12 RELATED COSTS FOR RENOVATIONS OF THE 13 BENSALEM EMERGENCY MEDICAL SERVICES 14 HEADQUARTERS 1,000,000 15 (C) CONSTRUCTION AND OTHER NECESSARY COSTS <-- 16 FOR EXPANSION OF POLICE ADMINISTRATIVE 17 BUILDING 3,000,000 18 (D) ACQUISITION OF 120 ACRES OF GOLF 19 COURSE PROPERTY FOR COMMUNITY ACCESS 5,000,000 20 (E) ACQUISITION OF 50 ACRES OF PROPERTY IN 21 THE TREVOSE SECTION OF BENSALEM 22 TOWNSHIP FOR COMMUNITY ACCESS 3,000,000 23 (F) ACQUISITION OF LAND ALONG THE DELAWARE 24 RIVERFRONT FOR COMMUNITY ACCESS 7,000,000 25 (G) CONSTRUCTION OF EMERGENCY SERVICES 26 TRAINING FACILITY FOR POLICE, FIRE AND 27 RESCUE SERVICES 6,000,000 28 (iii) Bristol Borough 29 (A) Construction, infrastructure and other 30 related costs for parking facilities 3,000,000 20070H1589B3496 - 111 -
1 (B) Construction, infrastructure and other 2 related costs for waterfront 3 development 2,000,000 4 (C) Acquisition, construction, 5 infrastructure and other related costs 6 for waterfront development along the 7 Delaware River 2,000,000 8 (D) Acquisition, construction, 9 infrastructure and other related costs 10 for Elm and Chestnut Streets 11 redevelopment 2,500,000 12 (E) INFRASTRUCTURE, RENOVATION, EXPANSION <-- 13 AND OTHER RELATED CONSTRUCTION COSTS 14 FOR THE REGIONAL PUBLIC SAFETY TRAINING 15 CENTER 600,000 16 (F) INFRASTRUCTURE, CONSTRUCTION, 17 REDEVELOPMENT AND ENHANCEMENT OF THE 18 MEMORIAL FIELDS, LOCATED AT JEFFERSON 19 AVENUE AND GARDEN STREET 750,000 20 (iv) Bristol Township 21 (A) Infrastructure, redevelopment and 22 other related costs to convert the 23 Lower Bucks Hospital to a full 24 telemetry-based hospital 1,000,000 25 (B) Infrastructure, redevelopment and 26 other related costs for Lower Bucks 27 Hospital security upgrades and 28 bioterrorism training 575,000 29 (C) Construction, infrastructure and other 30 related costs to rebuild the Lower 20070H1589B3496 - 112 -
1 Bucks Hospital Patient Unit 4F 3,000,000 2 (D) Infrastructure, redevelopment and 3 other related costs to purchase three 4 portable orthopedic X-ray machines for 5 Lower Bucks Hospital 420,000 6 (E) Construction, infrastructure and other 7 related costs for the renovation of the 8 Bristol Township municipal building 8,000,000 9 (F) Infrastructure, redevelopment and 10 other related costs to build a Lower 11 Bucks Hospital vascular lab 2,000,000 12 (G) Infrastructure, redevelopment and 13 other related costs for safety and code 14 upgrades for Lower Bucks Hospital 2,500,000 15 (H) Infrastructure, redevelopment and 16 other related costs to purchase a 64- 17 slice CT scanner for Lower Bucks 18 Hospital 2,500,000 19 (I) Infrastructure, redevelopment and 20 other related costs to purchase two 21 digital mammography systems for Lower 22 Bucks Hospital 725,000 23 (J) Infrastructure, redevelopment and 24 other related costs to purchase 25 Computerized Physician Order Entry 26 (CPOE)systems for Lower Bucks Hospital 1,500,000 27 (v) Chalfont Borough 28 (A) Acquisition and construction for 29 Chalfont Firehouse 500,000 30 (B) Acquisition, construction, 20070H1589B3496 - 113 -
1 infrastructure and other costs related 2 to the expansion of The Children's 3 Hospital of Philadelphia Specialty Care 4 and Ambulatory Surgery Center 500,000 5 (V.1) DOYLESTOWN TOWNSHIP <-- 6 (A) RENOVATIONS AND CONSTRUCTION OF A NEW 7 EMERGENCY DEPARTMENT AT THE DOYLESTOWN 8 HOSPITAL 30,000,000 9 (vi) Falls Township 10 (A) Construction and other related costs 11 for the Falls Township Senior Citizen 12 Center 1,000,000 13 (B) Acquisition, construction, <-- 14 infrastructure and other related costs 15 for the YMCA Community Center at Snipes 16 Farm 4,000,000 17 (vii) Hamburg Borough <-- 18 (A) Construction and related 19 infrastructure for the Hamburg Area 20 High School Stadium Project 500,000 21 (viii) (VII) Hilltown Township <-- 22 (A) Construction and restoration of Pearl 23 S. Buck House 1,000,000 24 (VIII.1) (VIII) HULMEVILLE BOROUGH <-- 25 (A) RENOVATIONS AND EXPANSION OF THE 26 WILLIAM PENN FIRE COMPANY SUBSTATION 500,000 27 (ix) Langhorne Borough 28 (A) Expansion and renovation of St. Mary's 29 Hospital, including construction 1,000,000 30 (IX.1) LOWER SOUTHAMPTON TOWNSHIP <-- 20070H1589B3496 - 114 -
1 (A) ACQUISITION, CONSTRUCTION AND OTHER 2 COSTS RELATED TO THE LOWER SOUTHAMPTON 3 AREA COMMUNITY CENTER 5,000,000 4 (x) Middletown Township 5 (A) Construction and other related costs 6 for the Middletown Community Center 1,500,000 7 (B) CONSTRUCTION, REDEVELOPMENT AND OTHER <-- 8 COSTS RELATED TO THE ST. MARY MEDICAL 9 CENTER 2,500,000 10 (xi) Nockamixon Township 11 (A) Renovation of Central Bucks Senior 12 Center, including construction and 13 related infrastructure 60,000 14 (XI.1) NORTHAMPTON TOWNSHIP <-- 15 (A) CONSTRUCTION AND NECESSARY COSTS FOR 16 NEW BUILDING FOR POLICE DEPARTMENT 1,250,000 17 (B) IMPROVEMENTS TO HISTORIC DOLINGTON 18 STREETSCAPE, INCLUDING SIDEWALKS 2,100,000 19 (C) NORTHAMPTON TOWNSHIP PARK AND 20 RECREATION CAPITAL IMPROVEMENTS 750,000 21 (xii) Sellersville Borough 22 (A) Construction of the Recovery Center at 23 Penn Foundation, including related 24 infrastructure costs 1,000,000 25 (xiii) Warrington Township 26 (A) Construction of West End Fire Station, 27 including related infrastructure 500,000 28 (XIII.1) WARWICK TOWNSHIP <-- 29 (A) CONSTRUCTION OF NEW BUILDING FOR 30 WARWICK TOWNSHIP FIRE COMPANY, 20070H1589B3496 - 115 -
1 INCLUDING NECESSARY COSTS 1,000,000 2 (XIV) QUAKERTOWN BOROUGH <-- 3 (A) CONSTRUCTION AND REHABILITATION OF 4 UPPER BUCKS YMCA 2,000,000 5 (10) Butler County 6 (i) County projects 7 (A) COMMUNITY DEVELOPMENT CORPORATION OF <-- 8 BUTLER COUNTY 9 (I) ACQUISITION, INFRASTRUCTURE, 10 CONSTRUCTION AND DEVELOPMENT OF THE 11 BUFFALO TOWNSHIP BUSINESS AND 12 TECHNOLOGY PARK, LOCATED ON A 40- 13 ACRE PARCEL OF LAND AT THE 14 INTERSECTION OF ROUTE 28 AND ROUTE 15 356 1,500,000 16 (II) INFRASTRUCTURE, CONSTRUCTION AND 17 RENOVATION OF THE FORMER PULLMAN 18 STANDARD OFFICE BUILDING FOR USE AS 19 A MULTITENANT, MIXED-USE FACILITY 3,000,000 20 (III) ACQUISITION, INFRASTRUCTURE, 21 CONSTRUCTION AND REDEVELOPMENT OF A 22 20-ACRE PARCEL OF BROWNFIELD LAND 23 IN THE FORMER JET FUEL ADDITIVE 24 FACILITY IN FORWARD TOWNSHIP 1,000,000 25 (B) RENOVATIONS AND CONSTRUCTION OF THE 26 CENTRAL HISTORICAL MUSEUM AND 27 PRESERVATION OF SEVERAL OTHER 28 HISTORICAL PROPERTIES 2,000,000 29 (C) CONSTRUCTION OF THE ALAMEDA SPORTS AND 30 EXHIBITION COMPLEX 4,000,000 20070H1589B3496 - 116 -
1 (D) INFRASTRUCTURE, DEVELOPMENT AND
2 CONSTRUCTION OF A NEW ARTS AND CULTURAL
3 CENTER ON THE BUTLER COUNTY COMMUNITY
4 COLLEGE CAMPUS IN BUTLER TOWNSHIP 6,600,000
5 (A) (E) Acquisition, construction, <--
6 infrastructure and other related costs
7 for a new inpatient facility at Butler
8 Memorial Hospital 20,000,000
9 (F) INFRASTRUCTURE, CONSTRUCTION AND <--
10 RENOVATION OF THE BECK LIBRARY AND
11 LEARNING RESOURCE CENTER AT BUTLER
12 COUNTY COMMUNITY COLLEGE 1,500,000
13 (ii) City of Butler
14 (A) Construction and related costs for
15 redevelopment of downtown district,
16 including related infrastructure 6,000,000
17 (B) Acquisition and development of former
18 Pullman Standard Office Building for
19 use as a multi-tenant facility 3,000,000
20 (iii) Buffalo Township
21 (A) Acquisition, construction and related
22 infrastructure for Business and
23 Technology Park 1,500,000
24 (iv) Butler Township
25 (A) Construction of Butler Crossing
26 project, including related
27 infrastructure 6,000,000
28 (v) Forward Township
29 (A) Acquisition and construction of
30 business park, including related
20070H1589B3496 - 117 -
1 infrastructure 1,000,000
2 (VI) JACKSON TOWNSHIP <--
3 (A) INFRASTRUCTURE, SITE DEVELOPMENT AND
4 OTHER CONSTRUCTION-RELATED ACTIVITIES
5 IN SUPPORT OF PREPARING PROPERTY ALONG
6 ROUTE 19 IN THE VICINITY OF ROUTE 528
7 FOR ECONOMIC DEVELOPMENT 5,000,000
8 (11) Cambria County
9 (i) County projects (Reserved) <--
10 (I) COUNTY PROJECTS <--
11 (A) CONSTRUCTION OF WORKFORCE DEVELOPMENT
12 CENTER FOR PENNSYLVANIA HIGHLANDS
13 COMMUNITY COLLEGE 500,000
14 (B) CONSTRUCTION AND RENOVATIONS FOR THE
15 CAMBRIA COUNTY WAR MEMORIAL 1,000,000
16 (ii) City of Johnstown
17 (A) Acquisition, construction,
18 infrastructure and other related costs
19 for brownfield redevelopment including
20 Festival Park 5,000,000
21 (B) Acquisition, construction,
22 infrastructure and other related costs
23 for downtown housing redevelopment 5,000,000
24 (C) Acquisition, construction,
25 infrastructure and other related costs
26 for Greater Johnstown YMCA
27 redevelopment including a community
28 center 5,000,000
29 (D) ACQUISITION, INFRASTRUCTURE <--
30 IMPROVEMENTS AND CONSTRUCTION FOR THE
20070H1589B3496 - 118 -
1 GREATER JOHNSTOWN REGIONAL TECH PARK,
2 PHASES II AND III 7,000,000
3 (iii) Richland Township
4 (A) Acquisition, construction,
5 infrastructure and other related costs
6 for the East Hills redevelopment
7 including a recreation center 7,000,000
8 (12) Cameron County (Reserved)
9 (13) Carbon County
10 (i) County projects (Reserved) <--
11 (I) COUNTY PROJECTS <--
12 (A) LAND ACQUISITION, INFRASTRUCTURE
13 IMPROVEMENTS AND CONSTRUCTION NECESSARY
14 TO MAINTAIN THE COMPETITIVE POSITION OF
15 AN EXISTING BUSINESS ENTITY OR FOR THE
16 DEVELOPMENT OF BUSINESS-READY SITES FOR
17 POTENTIAL BUSINESS TENANTS 1,000,000
18 (II) JIM THORPE
19 (A) RENOVATIONS FOR THE CARBON COUNTY
20 COURTHOUSE 500,000
21 (B) RENOVATIONS FOR THE CARBON COUNTY
22 COURTHOUSE ANNEX 300,000
23 (C) ACQUISITION, CONSTRUCTION, <--
24 INFRASTRUCTURE, REDEVELOPMENT AND OTHER
25 COSTS RELATED TO THE FLAGSTAFF RESORT
26 GONDOLA PROJECT 2,500,000
27 (II.1) LEHIGHTON BOROUGH
28 (A) ACQUISITION, CONSTRUCTION,
29 INFRASTRUCTURE, REDEVELOPMENT AND OTHER
30 RELATED COSTS FOR A NEW FIRE DEPARTMENT
20070H1589B3496 - 119 -
1 BUILDING 1,750,000 2 (II.1) (II.2) MAHONING TOWNSHIP <-- 3 (A) CONSTRUCTION, REDEVELOPMENT AND OTHER 4 RELATED COSTS FOR THE MAHONING TOWNSHIP 5 MUNICIPAL BUILDING 750,000 6 (III) MAHONING AND LEHIGHTON 7 (A) INFRASTRUCTURE IMPROVEMENTS, 8 DEVELOPMENT AND RELATED COSTS FOR THE 9 PACKERTON YARDS INDUSTRIAL PARK 3,000,000 10 (B) CONSTRUCTION, INFRASTRUCTURE, <-- 11 REDEVELOPMENT, ABATEMENT OF HAZARDOUS 12 MATERIALS AND OTHER COSTS RELATED TO 13 THE PACKERTON YARDS INDUSTRIAL PARK 14 SITE IMPROVEMENTS 1,250,000 15 (ii) (IV) Palmerton Borough <-- 16 (A) Construction, infrastructure and other 17 related costs for the regional Wall 18 Street West Initiative 25,000,000 19 (IV.1) SUMMIT HILL BOROUGH <-- 20 (A) CONSTRUCTION, INFRASTRUCTURE AND OTHER 21 RELATED COSTS FOR RESTORATION OF THE 22 SWITCHBACK GRAVITY RAILROAD SITE 8,000,000 23 (iii) (V) Weatherly Borough <-- 24 (A) Acquisition, construction, 25 infrastructure and other related costs 26 for the railroad/steel revitalization 27 project 1,500,000 28 (B) ACQUISITION, CONSTRUCTION, <-- 29 INFRASTRUCTURE, REDEVELOPMENT AND OTHER 30 RELATED COSTS FOR A NEW MUNICIPAL 20070H1589B3496 - 120 -
1 COMPLEX, INCLUDING VOLUNTEER FIRE 2 DEPARTMENT BUILDINGS 2,500,000 3 (14) Centre County 4 (i) County projects 5 (A) Construction, infrastructure and other 6 related costs for the expansion of CPI 7 Workforce Development 1,000,000 8 (B) Construction, infrastructure and other 9 related costs for a new biofuels plant 25,000,000 10 (C) Construction, infrastructure and other 11 related costs for the Phillipsburg 12 Borough Hall 2,000,000 13 (D) Acquisition, construction and other 14 related costs for the Hope and Reliance 15 United Firefighter Center 1,000,000 16 (E) Acquisition, construction, 17 infrastructure and other related costs 18 for the Centre County Recreation 19 Center 20,000,000 20 (F) Construction, infrastructure and other 21 related costs for the Moshannon Valley 22 Economic Partnership Industrial Park 1,000,000 23 (G) INFRASTRUCTURE, CONSTRUCTION AND OTHER <-- 24 RELATED COSTS FOR THE REDEVELOPMENT AND 25 EXPANSION OF THE COLONNADE SHOPPING 26 CENTER 5,000,000 27 (G) INFRASTRUCTURE, CONSTRUCTION AND OTHER <-- 28 RELATED COSTS FOR THE REDEVELOPMENT OF 29 LANDS ADJACENT TO THE COLONNADE 30 SHOPPING CENTER 5,000,000 20070H1589B3496 - 121 -
1 (H) ACQUISITION OF A 20-ACRE PARCEL OF 2 LAND, SITE DEVELOPMENT AND CONSTRUCTION 3 OF FACILITIES, INCLUDING TRANSPORTATION 4 AND MEDICAL ARTS TRAINING CENTERS 5,000,000 5 (I) ACQUISITION, CONSTRUCTION, 6 INFRASTRUCTURE AND OTHER RELATED COSTS 7 FOR CENTRE COUNTY PAWS 350,000 8 (J) ACQUISITION, CONSTRUCTION, RENOVATION, <-- 9 INFRASTRUCTURE AND OTHER RELATED COSTS 10 FOR A MEDICAL FACILITY IN THE MOSHANNON 11 VALLEY AREA 3,000,000 12 (I.1) BELLEFONTE BOROUGH 13 (A) ACQUISITION, INFRASTRUCTURE 14 IMPROVEMENTS AND CONSTRUCTION FOR 15 COUNTY SEAT PARKING AND TRANSIT 16 FACILITY 2,500,000 17 (ii) Centre Hall Borough 18 (A) Acquisition, construction, 19 infrastructure and other related costs 20 for the Grange Fair Multipurpose 21 Complex 750,000 22 (II.1) PHILLIPSBURG BOROUGH <-- 23 (A) INFRASTRUCTURE, REDEVELOPMENT AND 24 OTHER RELATED COSTS FOR PHILLIPSBURG 25 HOSPITAL RENOVATIONS AND IMPROVEMENTS 1,500,000 26 (iii) State College Borough 27 (A) Acquisition, construction, 28 infrastructure and other related costs 29 for a downtown redevelopment project 12,000,000 30 (15) Chester County 20070H1589B3496 - 122 -
1 (i) County projects 2 (A) Construction, acquisition and related 3 infrastructure for the Southeastern 4 Chester County Refuse Authority 550,000 5 (B) IMPROVEMENTS TO BUILDINGS LOCATED <-- 6 WITHIN THE LUKENS' NATIONAL HISTORIC 7 DISTRICT CAMPUS, INCLUDING NECESSARY 8 COSTS 2,000,000 9 (I.1) CITY OF COATESVILLE <-- 10 (A) ACQUISITION, INFRASTRUCTURE, 11 ENVIRONMENTAL REMEDIATION, CONSTRUCTION 12 AND OTHER RELATED COSTS FOR THE 13 REDEVELOPMENT OF A BROWNFIELD PROPERTY 14 KNOWN AS THE FLATS PROPERTY 20,000,000 15 (ii) Downingtown Borough 16 (A) Acquisition, construction, 17 infrastructure and other related costs 18 for River Station Downingtown 19 Redevelopment 9,500,000 20 (B) INFRASTRUCTURE IMPROVEMENTS AND <-- 21 CONSTRUCTION OF PEDESTRIAN AND BIKE 22 PATH SYSTEM ALONG THE BRANDYWINE CREEK 23 CONNECTING TO THE STRUBLE TRAIL 500,000 24 (C) CONSTRUCTION, INFRASTRUCTURE <-- 25 IMPROVEMENTS AND OTHER RELATED COSTS 26 FOR THE DOWNINGTOWN SENIOR CENTER AND 27 LIBRARY EXPANSION PROJECT 1,500,000 28 (II.1) MALVERN BOROUGH AND EAST WHITELAND 29 TOWNSHIP 30 (A) INFRASTRUCTURE IMPROVEMENTS, 20070H1589B3496 - 123 -
1 RENOVATIONS AND CONSTRUCTION FOR THE 2 BISHOP TUBE COMPLEX 2,500,000 3 (II.2) MALVERN BOROUGH 4 (A) INFRASTRUCTURE AND CONSTRUCTION OF THE 5 MALVERN FIRE COMPANY BUILDING 500,000 6 (II.3) PHOENIXVILLE BOROUGH 7 (A) PHOENIXVILLE LIBRARY EXPANSION AND 8 CONSTRUCTION OF A NEW FACILITY 1,000,000 9 (iii) Schuylkill Township 10 (A) Expansion of the Phoenixville YMCA, 11 including construction 3,000,000 12 (IV) SPRING CITY BOROUGH <-- 13 (A) SPRING CITY LIBRARY EXPANSION AND 14 CONSTRUCTION OF A NEW FACILITY 1,200,000 15 (V) SOUTH COATESVILLE BOROUGH AND EAST 16 FALLOWFIELD TOWNSHIP 17 (A) INFRASTRUCTURE IMPROVEMENTS AND 18 CONSTRUCTION OF CHESTER COUNTY FIRE- 19 POLICE TRAINING FACILITY 2,000,000 20 (B) CONSTRUCTION AND RELATED <-- 21 INFRASTRUCTURE TO EXPAND THE JENKINS 22 ARBORETUM EDUCATION CENTER 1,000,000 23 (VI) WEST BRADFORD TOWNSHIP 24 (A) INFRASTRUCTURE IMPROVEMENTS AND 25 CONSTRUCTION OF A NEW ANIMAL SHELTER 26 AND MEDICAL FACILITY 1,000,000 27 (VI.1) WEST CHESTER 28 (A) CHESTER COUNTY HISTORICAL SOCIETY, 29 BUILDING RENOVATION IMPROVEMENTS, 30 INCLUDING CONSTRUCTION AND OTHER 20070H1589B3496 - 124 -
1 RELATED COSTS 1,000,000
2 (B) ACQUISITION, INFRASTRUCTURE <--
3 IMPROVEMENTS AND CONSTRUCTION OF
4 UNDERGRADUATE BUSINESS CENTER AT WEST
5 CHESTER UNIVERSITY OF PENNSYLVANIA 3,000,000
6 (C) ACQUISITION, CONSTRUCTION,
7 INFRASTRUCTURE AND OTHER COSTS RELATED
8 TO THE EXPANSION OF THE HICKMAN SENIOR
9 HOUSING PROJECT 2,000,000
10 (D) CONSTRUCTION, INFRASTRUCTURE,
11 REDEVELOPMENT AND OTHER COSTS RELATED
12 TO THE MOSTELLER PARKING GARAGE
13 REPLACEMENT PROJECT 1,000,000
14 (VII) WEST CHESTER BOROUGH AND WEST GOSHEN
15 TOWNSHIP
16 (A) INFRASTRUCTURE IMPROVEMENTS AND
17 CONSTRUCTION OF A CARDIOVASCULAR CENTER
18 AT CHESTER COUNTY HOSPITAL 10,000,000
19 (VIII) WEST PIKELAND TOWNSHIP
20 (A) RENOVATIONS TO THE HISTORIC WASHINGTON
21 BUILDING AT HISTORIC YELLOW SPRINGS,
22 INCLUDING INFRASTRUCTURE IMPROVEMENTS
23 AND CONSTRUCTION 750,000
24 (IX) WILLISTOWN TOWNSHIP
25 (A) INFRASTRUCTURE IMPROVEMENTS AND
26 CONSTRUCTION OF A NATURE AND COMMUNITY
27 CENTER ON WILLISTOWN'S OKEHOCKING
28 PRESERVE 1,000,000
29 (16) Clarion County
30 (i) County projects (Reserved) <--
20070H1589B3496 - 125 -
1 (I) COUNTY PROJECTS <--
2 (A) INFRASTRUCTURE, CONSTRUCTION,
3 REDEVELOPMENT AND OTHER RELATED COSTS
4 FOR THE CONSTRUCTION OF A RESERVOIR/DAM
5 TO PROVIDE AN ALTERNATE WATER SUPPLY
6 FOR THE BEAVER CREEK KEYSTONE
7 INNOVATION ZONE 100,000
8 (B) INFRASTRUCTURE, CONSTRUCTION,
9 REHABILITATION AND OTHER RELATED COSTS
10 FOR IMPROVEMENTS TO A WATER SUPPLY THAT
11 SERVES THE CLARION COUNTY COMMERCE
12 CENTER KEYSTONE OPPORTUNITY ZONE AND
13 THE KNOX INDUSTRIAL PARK 375,000
14 (C) REDEVELOPMENT AND CONSTRUCTION OF
15 INCUBATOR SPACE WITHIN THE CLARION
16 UNIVERSITY BIOTECHNOLOGY BUSINESS
17 DEVELOPMENT CENTER AND INCUBATOR
18 FACILITY LOCATED IN THE TRINITY POINT
19 TECHNOLOGY PARK 850,000
20 (ii) Foxburg Borough
21 (A) Site development and construction of
22 Municipal Center Building to support
23 downtown revitalization 3,000,000
24 (III) CLARION BOROUGH <--
25 (A) INFRASTRUCTURE AND CONSTRUCTION OF A
26 SIDEWALK ALONG GREENVILLE AVENUE FROM
27 RHEINHARD VILLAGE TO CLARION
28 UNIVERSITY 500,000
29 (iii) (IV) Clarion Township <--
30 (A) Site development and construction of
20070H1589B3496 - 126 -
1 Clarion County YMCA facility, including 2 land acquisition and related 3 infrastructure 3,500,000 4 (B) EXPANSION OF CLARION COUNTY YMCA 5,000,000 <-- 5 (17) Clearfield County 6 (i) County projects 7 (A) Construction and other related costs 8 for the Wood Pellet Mill project 1,000,000 9 (B) Construction and other costs 10 associated with the Biomass Conversion 11 Center of Excellence 2,750,000 12 (C) Construction, infrastructure and other 13 costs related to coal gasification 14 project 20,000,000 15 (D) EXPANSION OF FACILITIES TO ACCOMMODATE <-- 16 HEALTH INFORMATION TECHNOLOGY (HIT) AND 17 WESTERN PA HEALTH INFORMATION 18 CONNECTION (HIC), INCLUDING 19 CONSTRUCTION OF A NEW 10,000-SQUARE- 20 FOOT BUILDING AND ASSOCIATED 21 INFRASTRUCTURE IMPROVEMENTS AT DUBOIS 22 REGIONAL MEDICAL CENTER 875,000 23 (E) CONSTRUCTION, INFRASTRUCTURE AND OTHER <-- 24 RELATED COSTS FOR A COAL-FIRED POWER 25 PLANT 20,000,000 26 (ii) Clearfield Borough 27 (A) Acquisition, construction, 28 infrastructure and other related costs 29 for riverfront development 6,000,000 30 (B) Construction, infrastructure and other 20070H1589B3496 - 127 -
1 related costs for a riverwalk, park 2 revitalization and fish ladder along 3 the Susquehanna River 2,500,000 4 (C) Construction, infrastructure and other 5 related costs for business district 6 parking facilities 5,000,000 7 (D) CONSTRUCTION OF A NEW CENTER FOR <-- 8 PERFORMING ARTS AS PART OF THE DOWNTOWN 9 CLEARFIELD REVITALIZATION, INCLUDING 10 LAND ACQUISITION AND INFRASTRUCTURE 11 IMPROVEMENTS 2,000,000 12 (E) CONSTRUCTION AND INFRASTRUCTURE 13 IMPROVEMENTS FOR THE DEVELOPMENT OF THE 14 CLEARFIELD RENEWABLE ENERGY DISTRICT 5,000,000 15 (F) DOWNTOWN REDEVELOPMENT, INCLUDING 16 PEDESTRIAN ENHANCEMENTS NECESSARY TO 17 IMPLEMENT A STRATEGY TO ENCOURAGE 18 BUSINESS AND GOVERNMENTAL ENTITIES TO 19 RELOCATE TO THE BOROUGH 5,000,000 20 (G) CONSTRUCTION OF A NEW CENTRALIZED 21 FIREHOUSE TO SUPPORT THE CONSOLIDATION 22 OF FOUR EXISTING FIRE DEPARTMENTS, 23 INCLUDING LAND ACQUISITION AND 24 INFRASTRUCTURE IMPROVEMENTS 1,500,000 25 (H) CONSTRUCTION OF A 300-SPACE PARKING 26 FACILITY TO BE LOCATED NEAR THE 27 CLEARFIELD COUNTY COURTHOUSE, INCLUDING 28 LAND ACQUISITION AND INFRASTRUCTURE 29 IMPROVEMENTS 5,000,000 30 (I) CLEARFIELD HOSPITAL IMAGING DEPARTMENT 20070H1589B3496 - 128 -
1 IMPROVEMENTS, INCLUDING ACQUISITION OF 2 A 1.5T HIGH FIELD STRENGTH SHORT BORE 3 MRI, BREAST MRI COMPUTER AIDED 4 DETECTION SYSTEM, DUAL HEAD NUCLEAR 5 MEDICINE CAMERA AND FULL BODY AXIAL FAN 6 BEAM BONE DENSITOMETER 1,045,000 7 (J) RENOVATION AND EXPANSION OF THE 8 EMERGENCY DEPARTMENT OF CLEARFIELD 9 HOSPITAL TO INCREASE CAPACITY FROM 12 10 BEDS TO 24 BEDS 1,750,000 11 (II.1) CITY OF DUBOIS <-- 12 (A) ACQUISITION, CONSTRUCTION, 13 REDEVELOPMENT AND OTHER COSTS RELATED 14 TO THE CONSTRUCTION OF A STATE-OF-THE- 15 ART BASEBALL FIELD, INCLUDING A 16 GRANDSTAND, LOCKER ROOM FACILITIES AND 17 A PARKING LOT 1,250,000 18 (iii) Curwensville Borough 19 (A) Infrastructure and other costs related 20 to building the Sunnyside Ethanol 21 Manufacturing Plant 5,000,000 22 (III.1) FOXBURG BOROUGH <-- 23 (A) COMMUNITY REDEVELOPMENT RELATING TO 24 PUBLIC IMPROVEMENTS 5,000,000 25 (III.2) IRVONA BOROUGH 26 (A) ACQUISITION, CONSTRUCTION, 27 INFRASTRUCTURE, REDEVELOPMENT, 28 ABATEMENT OF HAZARDOUS MATERIALS AND 29 OTHER RELATED COSTS FOR THE IRVONA 30 BRICKYARD 2,000,000 20070H1589B3496 - 129 -
1 (iv) Karthous Township 2 (A) Construction, infrastructure and other 3 costs associated with the River Hill 4 Power Waste Coal Fired Power Plant 15,000,000 5 (v) Lawrence Township 6 (A) Construction and other related costs 7 for a BioEnergy Ethanol Plant 5,000,000 8 (B) ACQUISITION, CONSTRUCTION, <-- 9 INFRASTRUCTURE AND OTHER RELATED COSTS 10 FOR PHASE II OF THE CLEARFIELD 11 FIREMEN'S COMMERCE PARK PROJECT 5,000,000 12 (18) Clinton County 13 (i) County projects 14 (A) Acquisition, construction and other 15 related costs for the Beech Creek 16 Watershed project 5,000,000 17 (B) Construction and other related costs 18 for the Annie Halenbake Ross Library 19 and Renovo Library 1,000,000 20 (C) Acquisition, construction, 21 infrastructure and other related costs 22 for the Susquehanna River Corridor 2,000,000 23 (D) CONSTRUCTION, ACQUISITION, <-- 24 REDEVELOPMENT AND OTHER COSTS RELATED 25 TO THE BUCKTAIL MEDICAL CENTER 250,000 26 (E) CONSTRUCTION, INFRASTRUCTURE AND OTHER <-- 27 RELATED COSTS FOR THE LAMAR TOWNSHIP 28 BUSINESS PARK ACCESS IMPROVEMENT 29 PROJECT 7,500,000 30 (ii) City of Lock Haven 20070H1589B3496 - 130 -
1 (A) Construction, infrastructure and other
2 costs associated with the Downtown
3 Streetscape improvement project 1,250,000
4 (B) Construction and other related costs
5 for the First Quality Products
6 Manufacturing Facility 1,000,000
7 (iii) Mill Hall Borough
8 (A) Acquisition, construction and other
9 related costs for Millbrook Playhouse 1,000,000
10 (III.1) RENOVO BOROUGH <--
11 (A) IMPROVEMENTS TO RAILCAR FACILITY AT
12 RENOVO INDUSTRIAL PARK TO ENHANCE
13 PRODUCTION, INCLUDING UTILITY
14 IMPROVEMENTS, RAIL IMPROVEMENTS AND
15 BUILDING RENOVATION AND IMPROVEMENTS 3,000,000
16 (iv) Wayne Township
17 (A) Construction and other related costs
18 for Zindel Park development and
19 improvements 500,000
20 (19) Columbia County (Reserved)
21 (20) Crawford County
22 (i) County projects (Reserved) <--
23 (I) COUNTY PROJECTS <--
24 (A) RENOVATIONS, REHABILITATION AND OTHER
25 RELATED COSTS FOR THE RESTORATION OF
26 THE HISTORIC TARBELL HOUSE LOCATED IN
27 THE CITY OF TITUSVILLE 500,000
28 (I.1) CITY OF MEADVILLE <--
29 (A) INFRASTRUCTURE, CONSTRUCTION AND OTHER
30 RELATED COSTS FOR A MEADVILLE POLICE
20070H1589B3496 - 131 -
1 INDOOR SHOOTING RANGE AND TRAINING 2 FACILITY 2,250,000 3 (B) CONSTRUCTION OF THE NORTHWEST <-- 4 PENNSYLVANIA RAILROAD AND TOOLING 5 CENTER, INCLUDING NECESSARY COSTS 3,000,000 6 (C) INFRASTRUCTURE, CONSTRUCTION AND OTHER 7 RELATED COSTS FOR THE DEVELOPMENT OF 8 THE NORTHWESTERN PENNSYLVANIA RAILROAD 9 AND TOOLING HERITAGE CENTER 3,000,000 10 (ii) Vernon Township 11 (A) Acquisition, construction, 12 infrastructure and other related costs 13 for the Crawford County Industrial Park 14 East 2,000,000 15 (III) REDEVELOPMENT AUTHORITY OF THE CITY OF <-- 16 MEADVILLE 17 (A) CONVERSION OF THE TALON 5 FACILITY TO <-- 18 MARKET FOR COMMERCIAL PURPOSES 3,000,000 19 (A) REDEVELOPMENT OF THE TALON 5 FACILITY <-- 20 FOR MIXED-USE DEVELOPMENT 3,000,000 21 (IV) TITUSVILLE REDEVELOPMENT AUTHORITY 22 (A) CONSTRUCTION, RENOVATION, 23 INFRASTRUCTURE AND REDEVELOPMENT OF THE 24 TITUSVILLE OPPORTUNITY PARK KEYSTONE 25 OPPORTUNITY ZONE 2,000,000 26 (21) Cumberland County 27 (i) County projects (Reserved) 28 (I.1) CUMBERLAND COUNTY REDEVELOPMENT <-- 29 AUTHORITY 30 (A) CONSTRUCTION AND RELATED 20070H1589B3496 - 132 -
1 INFRASTRUCTURE TO UPGRADE THE 2 SHIPPENSBURG UNIVERSITY ATHLETIC 3 COMPLEX 2,500,000 4 (II) BOROUGH OF CARLISLE 5 (A) CONSTRUCTION OF ADDITION TO BOSLER 6 LIBRARY 2,500,000 7 (B) ACQUISITION AND EXPANSION OF CARLISLE 8 CENTRAL FARMERS MARKET 750,000 9 (C) INFRASTRUCTURE, CONSTRUCTION AND <-- 10 REHABILITATION OF THE CENTRAL 11 PENNSYLVANIA YOUTH BALLET DANCE 12 PERFORMANCE COMPLEX AT DICKINSON 13 COLLEGE 2,500,000 14 (II.1) BOROUGH OF LEMOYNE 15 (A) INFRASTRUCTURE, CONSTRUCTION, 16 REHABILITATION AND OTHER RELATED COSTS 17 FOR THE REPLACEMENT OF THE COMMUNITY 18 POOL 750,000 19 (B) ACQUISITION, CONSTRUCTION, 20 REDEVELOPMENT AND OTHER RELATED COSTS 21 FOR PHASE 2 OF THE DOWNTOWN, 22 REDEVELOPMENT PROJECT, INCLUDING 23 TRAFFIC ENHANCEMENTS, LIGHTING, 24 LANDSCAPING AND OTHER NECESSARY 25 REHABILITATION 5,000,000 26 (C) ACQUISITION, INFRASTRUCTURE, 27 CONSTRUCTION AND OTHER RELATED COSTS 28 FOR THE REPLACEMENT OF THE WEST SHORE 29 BUREAU OF FIRE STATION 1,500,000 30 (III) BOROUGH OF MECHANICSBURG 20070H1589B3496 - 133 -
1 (A) ACQUISITION RELATED TO THE 2 CONSTRUCTION OF A NEW FACILITY FOR THE 3 MECHANICSBURG ART CENTER 1,250,000 4 (ii) (IV) Shippensburg Township <-- 5 (A) Infrastructure improvements and 6 construction of Shippensburg Regional 7 Conference Center 3,000,000 8 (iii) (V) Silver Spring Township <-- 9 (A) Construction, site preparation and 10 other related costs for a mixed-use 11 development 5,000,000 12 (iv) (VI) Upper Allen Township <-- 13 (A) Construction of Rider-Musser mixed-use 14 development operated by Messiah 15 College, including related 16 infrastructure 7,500,000 17 (B) Construction of a regional conference 18 center at Messiah College, including 19 related infrastructure 6,000,000 20 (22) Dauphin County 21 (i) County projects (Reserved) <-- 22 (I) COUNTY PROJECTS <-- 23 (A) RENOVATIONS TO THE HERSHEY MEMORIAL 24 FIELD COMPLEX 1,500,000 25 (B) CONSTRUCTION OF AN EMERGENCY MEDICAL <-- 26 FACILITY IN UPPER DAUPHIN COUNTY, 27 INCLUDING NECESSARY COSTS 20,000,000 28 (ii) City of Harrisburg 29 (A) Construction and other related costs 30 for the Pinnacle Health Hospital 20070H1589B3496 - 134 -
1 Emergency Department 5,000,000 2 (B) Construction, infrastructure and other 3 related costs for renovation of the 4 Whitaker Center for Science and the 5 Arts 1,500,000 6 (C) CONSTRUCTION AND OTHER COSTS RELATED <-- 7 TO THE PENNSYLVANIA LAW ENFORCEMENT 8 MEMORIAL 1,500,000 9 (D) CONSTRUCTION, EQUIPMENT, <-- 10 INFRASTRUCTURE AND OTHER RELATED COSTS 11 FOR RENOVATIONS TO CREATE A PSYCHIATRIC 12 EVALUATION UNIT AT THE POLYCLINIC 13 CAMPUS OF PINNACLE HEALTH HOSPITAL 9,000,000 14 (E) CONSTRUCTION AND RENOVATION OF A NEW 15 CAPITAL REGION HEALTH SYSTEM, INC., 16 MEDICAL CENTER 5,000,000 17 (F) CONSTRUCTION AND RENOVATION OF 18 ACADEMIC OFFICES, STUDENT HOUSING AND 19 CLASSROOMS IN DOWNTOWN HARRISBURG 3,500,000 20 (G) CONSTRUCTION, EQUIPMENT, 21 INFRASTRUCTURE AND OTHER RELATED COSTS 22 FOR THE OUTPATIENT CANCER TREATMENT 23 CENTER AT THE COMMUNITY CAMPUS OF 24 PINNACLE HEALTH SYSTEM 13,000,000 25 (iii) Derry Township 26 (A) Acquisition, construction, 27 infrastructure and other related costs 28 for the Hershey Area Master Plan 25,000,000 29 (B) CONSTRUCTION, FIT OUT, RENOVATION, <-- 30 EQUIPMENT AND RELATED COSTS FOR THE 20070H1589B3496 - 135 -
1 HERSHEY CENTER FOR APPLIED RESEARCH 25,000,000 2 (C) EXPANSION OF BIKE PATH, INCLUDING 3 NECESSARY COSTS 2,000,000 4 (D) HERSHEY STREETSCAPE PROJECT, INCLUDING 5 NECESSARY COSTS 3,000,000 6 (III.1) HUMMELSTOWN BOROUGH 7 (A) RENOVATION OF HUMMELSTOWN CHEMICAL 8 FIRE COMPANY NO. 1 FACILITY, INCLUDING 9 NECESSARY COSTS 1,500,000 10 (iv) Lower Paxton Township 11 (A) Construction of Heroes Grove, 12 including related infrastructure 1,000,000 <-- 13 INCLUDING RELATED INFRASTRUCTURE 4,000,000 <-- 14 (B) Construction and development of the 15 Thomas B. George Park 1,000,000 16 (IV.1) MIDDLETOWN BOROUGH <-- 17 (A) CONSTRUCTION AND RENOVATION TO 18 MIDDLETOWN VOLUNTEER FIRE DEPARTMENT 19 FACILITY, INCLUDING NECESSARY COSTS 2,500,000 20 (V) MIDDLE PAXTON TOWNSHIP 21 (A) CONSTRUCTION OF A FACILITY TO HOUSE 22 THE DAUPHIN MIDDLE PAXTON FIRE COMPANY, 23 INCLUDING NECESSARY COSTS 1,500,000 24 (V) (VI) Swatara Township <-- 25 (A) Construction and infrastructure 26 related to the development of Swatara 27 Commons 10,000,000 28 (23) Delaware County 29 (i) County projects 30 (A) Acquisition and other related costs to 20070H1589B3496 - 136 -
1 Tri Borough Fire Company Consolidation 500,000 2 (B) DELAWARE COUNTY HOUSING AUTHORITY, <-- 3 ACQUISITION, INFRASTRUCTURE AND 4 CONSTRUCTION OF THE FAIRGROUNDS HOUSING 5 DEVELOPMENT LOCATED NEAR I-95 AND THE 6 COMMODORE BARRY BRIDGE ON ENGLE STREET 1,500,000 7 (C) DELAWARE COUNTY REDEVELOPMENT 8 AUTHORITY, ACQUISITION, INFRASTRUCTURE, 9 CONSTRUCTION AND OTHER RELATED COSTS 10 FOR THE REDEVELOPMENT OF PROPERTIES IN 11 THE PENN HILLS AREA OF RIDLEY TOWNSHIP 2,000,000 12 (D) INFRASTRUCTURE IMPROVEMENTS AND 13 RENOVATIONS TO THE NILE SWIM CLUB 500,000 14 (E) ACQUISITION, CONSTRUCTION AND OTHER <-- 15 COSTS RELATED TO THE DELAWARE COUNTY 16 STREETSCAPE AND INFRASTRUCTURE 17 IMPROVEMENTS PROJECT 500,000 18 (F) CONSTRUCTION OF THE NEW MILITARY 19 COLLEGE OF PENNSYLVANIA ON THE CAMPUS 20 OF VALLEY FORGE MILITARY ACADEMY AND 21 COLLEGE 7,000,000 22 (G) CONSTRUCTION OF NEW ACADEMIC AND 23 MILITARY TRAINING FACILITIES, INCLUDING 24 REPAIR AND REPLACEMENT OF EXISTING 25 INFRASTRUCTURE 7,000,000 26 (I.1) BROOKHAVEN BOROUGH 27 (A) CONSTRUCTION AND OTHER RELATED COSTS 28 FOR THE BROOKHAVEN BOROUGH HALL ENERGY 29 PROJECT 500,000 30 (ii) City of Chester 20070H1589B3496 - 137 -
1 (A) Acquisition, construction, 2 infrastructure and other related costs 3 for the downtown revitalization 5,000,000 4 (B) CHESTER ECONOMIC DEVELOPMENT AUTHORITY <-- 5 (I) CONSTRUCTION OF A NEW PROFESSIONAL <-- 6 SPORTS STADIUM IN THE CITY OF 7 CHESTER 45,000,000 8 (I) INFRASTRUCTURE IMPROVEMENTS, <-- 9 ENVIRONMENTAL REMEDIATION, BULKHEAD 10 REPAIRS, SITE PREPARATION, PARKING, 11 EXHIBITION SPACE AND MULTIPURPOSE 12 RECREATIONAL AND SPORTS FACILITIES 13 FOR THE CHESTER WATERFRONT 45,000,000 14 (II) INFRASTRUCTURE IMPROVEMENTS, 15 BULKHEAD REPAIRS AND SITE 16 PREPARATION FOR ADDITIONAL 17 REDEVELOPMENT OF THE WATERFRONT 18 AREA IN CONJUNCTION WITH RECENT 19 HOUSING AND COMMERCIAL 20 REDEVELOPMENT 18,000,000 21 (III) UNIVERSITY CROSSING - 22 DEVELOPMENT OF A COMMERCIAL MIXED- 23 USE PROJECT WITH A 48-ROOM HOTEL 24 AND COMMERCIAL, RETAIL AND OFFICE 25 SPACE LOCATED ON INNER CITY LOTS 26 ADJACENT TO THE WIDENER UNIVERSITY 27 CAMPUS IN THE CITY OF CHESTER 250,000 28 (C) CONSTRUCTION AND OTHER RELATED COSTS <-- 29 FOR THE NEW SUPER MARKET PROJECT 2,500,000 30 (D) CONSTRUCTION AND OTHER RELATED COSTS <-- 20070H1589B3496 - 138 -
1 FOR THE SHOP RITE SUPERMARKET PROJECT 4,000,000 2 (II.1) CHESTER TOWNSHIP 3 (A) SITE ACQUISITION, REDEVELOPMENT OF 4 EXISTING IMPROVEMENTS, CONSTRUCTION, 5 INFRASTRUCTURE AND RELATED SITE 6 PREPARATION AND EQUIPPING FOR A 7 FILM/TELEVISION STUDIO PROJECT AND 8 RELATED TOURIST FACILITIES 15,000,000 9 (iii) Clifton Heights 10 (A) Acquisition and construction of 11 municipal service building and property 12 enhancements 3,000,000 13 (III.1) BOROUGH OF DARBY <-- 14 (A) DESIGN, DEVELOPMENT, CONSTRUCTION AND 15 RENOVATION OF NEW PRIVATE ROOMS AT 16 MERCY FITZGERALD HOSPITAL 1,538,000 17 (iv) Edgemont Township 18 (A) Construction of a multipurpose, 19 professional indoor equestrian arena 500,000 20 (v) Glenolden Borough 21 (A) Redevelopment and construction related 22 to the revitalization of various 23 borough buildings 500,000 24 (vi) Haverford Township 25 (A) Construction and other related costs 26 for the Haverford Township Community 27 Center 8,000,000 28 (B) RENOVATIONS AND EXPANSION OF THE MAIN <-- 29 LINE ART CENTER 600,000 30 (VI.1) BOROUGH OF MEDIA 20070H1589B3496 - 139 -
1 (A) EXPANSION AND RENOVATIONS TO THE <-- 2 HISTORICAL PENNSYLVANIA VETERANS MUSEUM 3 FACILITIES 3,500,000 4 (B) CONSTRUCTION, RENOVATIONS AND 5 EXPANSION OF THE MEDIA THEATRE 6 FACILITIES 850,000 7 (A) CONSTRUCTION OF A NEW FACILITY FOR THE <-- 8 HISTORICAL PENNSYLVANIA VETERANS 9 MUSEUM, INCLUDING LAND ACQUISITION AND 10 THE EXPANSION AND RENOVATION OF 11 EXISTING FACILITIES 3,500,000 12 (B) RENOVATION, REHABILITATION AND 13 EXPANSION OF THE MEDIA THEATRE 14 FACILITIES, INCLUDING CONSTRUCTION AND 15 LAND ACQUISITION FOR ANCILLARY 16 FACILITIES 850,000 17 (vii) Norwood Borough 18 (A) Construction of firehouse and police 19 station, including facility demolition 20 and site preparation 3,000,000 21 (viii) Radnor Township 22 (A) Construction, infrastructure and 23 related costs to renovate Woodcrest 24 Mansion 5,000,000 25 (B) CONSTRUCTION, INFRASTRUCTURE AND OTHER <-- 26 RELATED COSTS FOR THE NEW MILITARY 27 COLLEGE OF PENNSYLVANIA 7,000,000 28 (C) INFRASTRUCTURE IMPROVEMENTS, 29 CONSTRUCTION AND RELATED COSTS FOR THE 30 CENTER FOR PERFORMING ARTS AT EASTERN 20070H1589B3496 - 140 -
1 UNIVERSITY 5,000,000 2 (ix) Ridley Park Borough 3 (A) Redevelopment and construction related 4 to the revitalization of various 5 borough buildings 1,000,000 6 (B) Infrastructure improvements and 7 construction to Taylor Hospital 2,000,000 8 (x) Ridley Township 9 (A) Construction of new township community <-- 10 center 1,000,000 11 (B) (A) Construction, infrastructure and <-- 12 other related costs for the Ridley 13 Township Community Center 2,000,000 14 (X.1) SPRINGFIELD BOROUGH <-- 15 (A) RENOVATION AND EXPANSION OF THE BURN 16 TREATMENT CENTER AT CROZER-KEYSTONE 17 HEALTH SYSTEM 2,000,000 18 (xi) Swarthmore Borough 19 (A) Construction, acquisition, 20 infrastructure and other costs related 21 to the Swarthmore Town Center 22 Development 2,000,000 23 (B) ACQUISITION, CONSTRUCTION, <-- 24 INFRASTRUCTURE AND OTHER COSTS RELATED 25 TO THE SWARTHMORE TOWN CENTER 26 DEVELOPMENT PROJECT 5,000,000 27 (XI.1) SWARTHMORE, RUTLEDGE AND MORTON 28 BOROUGHS 29 (A) ACQUISITION OF LAND FOR THE TRI 30 BOROUGH FIRE COMPANY CONSOLIDATION 500,000 20070H1589B3496 - 141 -
1 (xii) Upper Darby Township
2 (A) Construction of public safety
3 building, including land acquisition
4 and related costs 7,000,000
5 (B) Construction and abatement of
6 hazardous materials related to
7 demolition of 501 Bywood 2,500,000
8 (C) Construction, infrastructure and other
9 costs related to rehabilitation of St.
10 Charles Cemetery 1,000,000
11 (24) Elk County (Reserved) <--
12 (D) ACQUISITION, REHABILITATION AND <--
13 CONSTRUCTION OF A STATE-OF-THE-ART
14 PUBLIC SAFETY BUILDING 6,500,000
15 (E) CONSTRUCTION RELATED TO THE
16 REDEVELOPMENT OF A FORMER WAREHOUSE
17 FACILITY, INCLUDING NECESSARY COSTS 500,000
18 (XIII) MARCUS HOOK BOROUGH
19 (A) ACQUISITION, INFRASTRUCTURE AND
20 CONSTRUCTION OF THE MARCUS HOOK STATION
21 SQUARE, A HOUSING AND COMMERCIAL SPACE
22 DEVELOPMENT, LOCATED ADJACENT TO THE
23 MARCUS HOOK TRAIN STATION AT THE
24 INTERSECTION OF MARKET AND EAST 10TH
25 STREETS IN CHESTER TOWNSHIP 1,000,000
26 (XIV) MARPLE TOWNSHIP
27 (A) DEMOLITION OF THE TOWNSHIP BUILDING
28 AND OTHER RELATED COSTS FOR THE
29 DISPOSAL OF ANY ENVIRONMENTAL HAZARDS 500,000
30 (24) ELK COUNTY
20070H1589B3496 - 142 -
1 (I) COUNTY PROJECTS (RESERVED)
2 (II) CITY OF ST. MARY'S
3 (A) IMPACT ST. MARY'S STREETSCAPE AND
4 INFRASTRUCTURE IMPROVEMENTS, INCLUDING
5 SIDEWALKS, CURBING, STREETLIGHTS,
6 STREET TREES, LAWNS AND SIGNAGE TO BE
7 LOCATED ALONG DEPOT STREET AND ERIE
8 AVENUE, REPLACEMENT OF THE IRON RUN
9 BRIDGE AND EXTENSION OF STACKPOLE
10 STREET TO WASHINGTON STREET 3,000,000
11 (B) REPAIR AND RENOVATION OF THE SKATE
12 PARK AND SKATE POND, CONSTRUCTION OF
13 WALKING PATHS AND UPGRADING OF
14 PLAYGROUND AND PARK EQUIPMENT AT
15 KAULMONT PARK 1,000,000
16 (III) ST. MARY'S AREA ECONOMIC DEVELOPMENT
17 CORPORATION
18 (A) CONSTRUCTION OF A NEW MEDICAL/SURGICAL
19 INPATIENT FLOOR, INCLUDING ACQUISITION
20 OF EQUIPMENT AND ELECTRONIC MEDICAL
21 RECORDS SYSTEMS FOR ELK REGIONAL HEALTH
22 CENTER 7,500,000
23 (25) Erie County
24 (i) County projects (Reserved) <--
25 (I) COUNTY PROJECTS <--
26 (A) ERIE-WESTERN PENNSYLVANIA PORT
27 AUTHORITY
28 (I) INFRASTRUCTURE AND CONSTRUCTION OF
29 RESTROOMS AND A CONCESSION BUILDING
30 WITHIN LIBERTY PARK 1,500,000
20070H1589B3496 - 143 -
1 (II) INFRASTRUCTURE, REHABILITATION, 2 CONSTRUCTION AND OTHER RELATED 3 COSTS TO REPAIR A DETERIORATED DOCK 4 WALL AT EAST DOBBINS LANDING 2,000,000 5 (B) ERIE COUNTY GENERAL AUTHORITY 6 (I) ACQUISITION, INFRASTRUCTURE, 7 CONSTRUCTION AND OTHER RELATED 8 COSTS OF ACQUIRING AND DEVELOPING A 9 PARCEL OF LAND FOR COMMERCIAL AND 10 INDUSTRIAL USE 3,000,000 11 (C) CONSTRUCTION, RENOVATIONS AND 12 EXPANSION OF THE EXPERIENCE CHILDREN'S 13 MUSEUM, LOCATED IN THE HISTORIC 14 DISTRICT OF DOWNTOWN ERIE 2,000,000 15 (I.1) CITY OF CORRY <-- 16 (A) ACQUISITION, CONSTRUCTION, 17 REDEVELOPMENT AND OTHER RELATED COSTS 18 FOR THE CONSTRUCTION OF A NEW CRITICAL 19 ACCESS HOSPITAL FACILITY 17,500,000 20 (ii) City of Erie 21 (A) Acquisition, construction, 22 infrastructure and other related costs 23 for Downtown Erie revitalization 15,000,000 24 (B) DESIGN, INFRASTRUCTURE AND <-- 25 CONSTRUCTION OF A NEW PHARMACY SCHOOL 26 AT LAKE ERIE COLLEGE OF OSTEOPATHIC 27 MEDICINE 20,000,000 28 (C) ACQUISITION, INFRASTRUCTURE, <-- 29 CONSTRUCTION, REDEVELOPMENT AND OTHER 30 RELATED COSTS FOR UPGRADES, 20070H1589B3496 - 144 -
1 IMPROVEMENTS AND ENHANCEMENTS TO THE
2 ERIE EVENT COMPLEX 25,000,000
3 (D) CONSTRUCTION, INFRASTRUCTURE,
4 REDEVELOPMENT AND OTHER COSTS RELATED
5 TO DEVELOPMENT OF THE DOWNTOWN CULTURAL
6 AND ENTERTAINMENT DISTRICT 25,000,000
7 (E) REDEVELOPMENT OF SB3 INDUSTRIAL PARK
8 TO MAKE PARK SHOVEL READY FOR NEW
9 DEVELOPMENT, INCLUDING NECESSARY COSTS 5,000,000
10 (III) HARBORCREEK TOWNSHIP
11 (A) ACQUISITION, INFRASTRUCTURE,
12 CONSTRUCTION AND OTHER RELATED COSTS
13 FOR THE DEVELOPMENT OF A LARGE-SCALE
14 RETAIL AND ENTERTAINMENT COMPLEX IN THE
15 VICINITY OF BREHAND CAMPUS OF THE
16 PENNSYLVANIA STATE UNIVERSITY 12,000,000
17 (IV) REDEVELOPMENT AUTHORITY OF THE CITY OF
18 CORRY
19 (A) ACQUISITION, INFRASTRUCTURE,
20 RENOVATIONS AND REHABILITATION OF FIVE
21 BUILDINGS COMPRISING THE WEST SIDE OF
22 CENTER STREET BETWEEN WASHINGTON AVENUE
23 AND MAIN STREET IN THE CITY OF CORRY
24 FOR THE DEVELOPMENT OF MULTITENANT,
25 MIXED-USE FACILITIES 2,750,000
26 (26) Fayette County
27 (i) County projects (Reserved) <--
28 (I) COUNTY PROJECTS <--
29 (A) CONNELLSVILLE AIRPORT, CONSTRUCTION OF
30 RUNWAY 5-23 EXTENSION 1,000,000
20070H1589B3496 - 145 -
1 (B) DEMOLITION, ACQUISITION, CONSTRUCTION <-- 2 AND OTHER RELATED COSTS FOR THE FAY- 3 PENN INDUSTRIAL BUILDING PROJECT 3,000,000 4 (C) DEMOLITION, ACQUISITION, CONSTRUCTION 5 AND OTHER RELATED COSTS FOR THE FAYETTE 6 INSTITUTE OF TECHNOLOGY 10,000,000 7 (D) ACQUISITION, INFRASTRUCTURE 8 IMPROVEMENTS, CONSTRUCTION AND OTHER 9 RELATED COSTS FOR THE FAY-PENN SPEC 10 BUILDING PROJECT 1,500,000 11 (ii) City of Uniontown 12 (A) Construction and other costs related 13 to the expansion and renovation of 14 Uniontown Hospital 10,000,000 15 (B) CONSTRUCTION, ACQUISITION, <-- 16 REDEVELOPMENT AND OTHER COSTS RELATED 17 TO THE DOWNTOWN UNIONTOWN REDEVELOPMENT 18 PROJECT 1,800,000 19 (iii) Brownsville Borough 20 (A) Acquisition, construction, 21 infrastructure and other related costs 22 for the downtown revitalization 2,000,000 23 (B) RENOVATIONS AND CONSTRUCTION OF THE <-- 24 TRANSPORTATION MUSEUM 500,000 25 (III.1) NORTH UNION TOWNSHIP 26 (A) ACQUISITION, INFRASTRUCTURE 27 IMPROVEMENTS AND CONSTRUCTION FOR THE 28 NORTH UNION TOWNSHIP COMMUNITY CENTER 3,500,000 29 (B) EBERLY CAMPUS, FAYETTE, CONSTRUCTION 30 OF ANNEX TO COMMUNITY CENTER 750,000 20070H1589B3496 - 146 -
1 (C) EBERLY CAMPUS, FAYETTE, CONSTRUCTION
2 OF ANNEX TO LIBRARY 875,000
3 (D) EBERLY CAMPUS, FAYETTE, CONSTRUCTION
4 OF BASEBALL/SOFTBALL COMPLEX 750,000
5 (E) EBERLY CAMPUS, FAYETTE, RENOVATIONS TO
6 THE CENTER FOR COMMUNITY AND PUBLIC
7 SAFETY OFFICE 400,000
8 (F) EBERLY CAMPUS, FAYETTE, CONSTRUCTION
9 OF RESIDENCE HALL 10,000,000
10 (iv) Perry Township
11 (A) Construction of new township municipal
12 building 1,000,000
13 (27) Forest County (Reserved)
14 (28) Franklin County (Reserved) <--
15 (28) FRANKLIN COUNTY <--
16 (I) COUNTY PROJECTS
17 (A) INFRASTRUCTURE, CONSTRUCTION AND OTHER
18 RELATED COSTS RELATED TO THE
19 CONSTRUCTION OF A ROADWAY THROUGH THE
20 GREENCASTLE-ANTRIM INDUSTRIAL PARK II 1,200,000
21 (B) CONSTRUCTION OF TRACK FACILITY AT
22 JAMES BUCHANAN HIGH SCHOOL, INCLUDING
23 NECESSARY COSTS 1,000,000
24 (II) GREENE TOWNSHIP
25 (A) INFRASTRUCTURE, CONSTRUCTION AND OTHER
26 RELATED COSTS FOR IMPROVEMENTS TO THE
27 INTERSECTION OF ROUTE 11 AND ROUTE 1,200,000
28 (III) WAYNESBORO BOROUGH
29 (A) INFRASTRUCTURE, CONSTRUCTION AND OTHER
30 RELATED COSTS RELATED TO THE
20070H1589B3496 - 147 -
1 REVITALIZATION OF DOWNTOWN, INCLUDING 2 THE INSTALLATION OF A PAVER SIDEWALK 3 ALONG MAIN STREET 532,000 4 (29) Fulton County (Reserved) <-- 5 (29) FULTON COUNTY <-- 6 (I) COUNTY PROJECTS 7 (A) CONSTRUCTION OF A MULTITENANT BUILDING 8 WITHIN THE FULTON COUNTY BUSINESS PARK 500,000 <-- 9 WITHIN THE FULTON COUNTY BUSINESS PARK 1,000,000 <-- 10 (II) AYR TOWNSHIP 11 (A) CONSTRUCTION OF A MULTITENANT BUILDING 12 IN FULTON COUNTY BUSINESS PARK, 13 INCLUDING NECESSARY COSTS 1,000,000 14 (30) GREEN GREENE County <-- 15 (i) County projects (Reserved) 16 (ii) Cumberland Township 17 (A) Construction, infrastructure, 18 redevelopment and other costs 19 associated with the Carmichaels Clinic 20 Expansion 500,000 21 (B) ACQUISITION, INFRASTRUCTURE <-- 22 IMPROVEMENTS, CONSTRUCTION AND OTHER 23 COSTS RELATED TO A TIRE RECYCLING 24 FACILITY IN PAISLEY PARK 6,000,000 25 (iii) Franklin Township 26 (A) Acquisition, construction and related 27 site preparation for the Cornerstone 28 Health Care Center 750,000 29 (B) Construction and other related costs 30 for the Community Aquatic Center 1,000,000 20070H1589B3496 - 148 -
1 (C) Construction and other related costs 2 for the expansions of the addition of 3 Southwest Regional Medical Center 1,500,000 4 (IV) MORGAN TOWNSHIP <-- 5 (A) DEVELOPMENT, CONSTRUCTION AND OTHER 6 RELATED COSTS FOR COMPLETION OF THE 7 MATHER GOB PILE RECLAMATION PROJECT 4,500,000 8 (V) JEFFERSON TOWNSHIP 9 (A) ACQUISITION, CONSTRUCTION, 10 INFRASTRUCTURE AND OTHER COSTS RELATED 11 TO THE JEFFERSON TOWNSHIP MANUFACTURING 12 FACILITY 500,000 13 (iv) (VI) Perry Township <-- 14 (A) Construction, infrastructure and other 15 related costs for the Meadow Ridge 16 Business Park 3,000,000 17 (v) (VII) Waynesburg Borough <-- 18 (A) Construction, acquisition, 19 infrastructure, redevelopment and other 20 costs associated with Downtown 21 Waynesburg Streetscape improvements 1,000,000 22 (B) Acquisition, construction, 23 infrastructure and other related costs 24 for the Greene County ARC Project 1,000,000 25 (C) Acquisition, construction, 26 infrastructure and other related costs 27 for Waynesburg redevelopment project 2,000,000 28 (D) ACQUISITION AND CONSTRUCTION OF THE <-- 29 DOWNTOWN WAYNESBURG REVITALIZATION 30 MIXED-USE IMPACT PROJECT 5,000,000 20070H1589B3496 - 149 -
1 (31) Huntingdon County (Reserved) <--
2 (31) HUNTINGDON COUNTY <--
3 (I) COUNTY PROJECTS (RESERVED)
4 (II) HUNTINGDON BOROUGH
5 (A) ACQUISITION, CONSTRUCTION AND
6 REHABILITATION OF A TRAIN STATION
7 STRUCTURE ON ALLEGHENY STREET IN THE
8 HUNTINGDON BOROUGH HISTORIC DISTRICT 1,103,000
9 (B) INFRASTRUCTURE, REHABILITATION AND
10 CONSTRUCTION OF A NEW MULTIPURPOSE
11 COMMUNITY CENTER 1,300,000
12 (C) ACQUISITION, CONSTRUCTION AND
13 REHABILITATION OF SEVERAL PROPERTIES
14 LOCATED ON ALLEGHENY STREET IN THE
15 HUNTINGDON BOROUGH HISTORIC DISTRICT 2,000,000
16 (III) SHIRLEY TOWNSHIP
17 (A) SITE PREPARATION AND INFRASTRUCTURE
18 FOR BACK LOT DEVELOPMENT OF RIVERVIEW
19 BUSINESS AND INDUSTRIAL PARK 750,000
20 (B) INFRASTRUCTURE IMPROVEMENTS TO THE
21 RIVERVIEW BUSINESS CENTER 1,100,000
22 (IV) SMITHFIELD TOWNSHIP
23 (A) LAND ACQUISITION AND SITE DEVELOPMENT
24 OF A PROPERTY LOCATED EAST OF GIANT
25 FOOD STORES ALONG ROUTE 22 525,000
26 (B) SITE PREPARATION AND CONSTRUCTION OF A
27 SHELL BUILDING FACILITY AT THE
28 INTERSECTION OF US 26 US 22 2,000,000
29 (V) SPRUCE CREEK TOWNSHIP
30 (A) INFRASTRUCTURE, CONSTRUCTION AND
20070H1589B3496 - 150 -
1 REHABILITATION TO UPGRADE FACILITIES AT 2 THE UNION FURNACE QUARRY 5,000,000 3 (32) Indiana County 4 (i) County projects 5 (A) Renovation of historical covered 6 bridges, including acquisition, 7 construction and other related costs 1,000,000 8 (B) ACQUISITION, INFRASTRUCTURE, <-- 9 CONSTRUCTION AND OTHER RELATED COSTS 10 FOR THE DEVELOPMENT OF A MULTITENANT 11 BUSINESS FACILITY 4,000,000 12 (C) ACQUISITION, INFRASTRUCTURE, 13 CONSTRUCTION AND OTHER RELATED COSTS 14 FOR THE DEVELOPMENT OF A 15 BUSINESS/INDUSTRIAL PARK 5,000,000 16 (D) LAND ACQUISITION, REMEDIATION, SITE <-- 17 PREPARATION, INFRASTRUCTURE 18 IMPROVEMENTS, CONSTRUCTION AND OTHER 19 RELATED COSTS FOR THE REDEVELOPMENT AND 20 REVITALIZATION OF BROWNFIELD SITES 21 LOCATED ALONG WAYNE AVENUE AND 13TH 22 STREETS 8,000,000 23 (E) LAND ACQUISITION, ENGINEERING, SITE 24 PREPARATION, INFRASTRUCTURE, 25 CONSTRUCTION AND OTHER RELATED COSTS 26 FOR THE VINEGAR HILL STEPS AND WATER 27 STREET WALL PROJECT, INCLUDING REQUIRED 28 SAFETY IMPROVEMENTS TO NORTH 7TH 29 STREET 2,000,000 30 (F) BUILDING IMPROVEMENTS, RENOVATIONS AND <-- 20070H1589B3496 - 151 -
1 OTHER RELATED COSTS FOR ATHLETIC 2 COMPLEX IMPROVEMENTS AT INDIANA AREA 3 SCHOOL DISTRICT SCHOOLS 1,000,000 4 (I.1) BLAIRSVILLE BOROUGH 5 (A) INFRASTRUCTURE AND BUILDING 6 IMPROVEMENTS, INCLUDING STREETSCAPE AND 7 OTHER RELATED COSTS FOR DOWNTOWN 8 REDEVELOPMENT PROJECTS 4,000,000 9 (ii) Burrell Township 10 (A) Land acquisition, site preparation and 11 construction related to development of 12 ambulatory care center at Indiana 13 Regional Medical Center 5,000,000 14 (B) Expansion of the Interchange Center 15 multitenant building, including 16 construction, land acquisition and 17 other related costs 2,000,000 18 (C) Redevelopment of Corporate Campus 19 Business Park, including acquisition, 20 construction, infrastructure and other 21 related costs 3,000,000 22 (iii) Indiana Borough 23 (A) Redevelopment, construction, and 24 infrastructure improvements along 25 Philadelphia Street and 7th Street 5,000,000 26 (III.1) HOMER CITY <-- 27 (A) CONSTRUCTION, LAND ACQUISITION AND 28 OTHER RELATED COSTS FOR HOMER-CENTER 29 COMMUNITY CENTER 1,500,000 30 (iv) White Township 20070H1589B3496 - 152 -
1 (A) Expansion of the Indiana Regional
2 Medical Center, including construction
3 and related infrastructure 1,000,000
4 (B) Construction of an agricultural
5 multitenant building, including land
6 acquisition, site preparation and other
7 related costs 3,000,000
8 (C) Redevelopment, construction and
9 infrastructure improvements along Wayne
10 Avenue and 13th Street 4,000,000
11 (D) Renovation of the Mack Park Recreation
12 Complex, including construction,
13 infrastructure and other related costs 3,000,000
14 (E) Acquisition, construction and related
15 infrastructure for the development of
16 the Windy Ridge Business Park 4,000,000
17 (F) Construction of a medical-model
18 wellness center at Indiana Regional
19 Medical Center, including acquisition,
20 infrastructure and other related costs 2,000,000
21 (33) Jefferson County (Reserved) <--
22 (G) ACQUISITION, INFRASTRUCTURE, <--
23 CONSTRUCTION AND OTHER RELATED COSTS
24 FOR THE DEVELOPMENT OF A MULTITENANT
25 BUSINESS FACILITY 2,000,000
26 (V) CENTER TOWNSHIP
27 (A) ACQUISITION, INFRASTRUCTURE,
28 CONSTRUCTION AND OTHER RELATED COSTS
29 FOR THE DEVELOPMENT OF A MULTITENANT
30 BUSINESS FACILITY 4,000,000
20070H1589B3496 - 153 -
1 (33) JEFFERSON COUNTY 2 (I) COUNTY PROJECTS (RESERVED) 3 (I.1) BROCKWAY BOROUGH <-- 4 (A) INFRASTRUCTURE, CONSTRUCTION, 5 REHABILITATION AND OTHER COSTS RELATED 6 TO RENOVATIONS TO THE TAYLOR MEMORIAL 7 PARK SWIMMING POOL, INCLUDING NECESSARY 8 ADA COMPLIANCE MODIFICATIONS 550,000 9 (II) BROOKVILLE BOROUGH 10 (A) PATIENT CARE IMPROVEMENTS, INCLUDING 11 EQUIPMENT ACQUISITION FOR BROOKVILLE 12 HOSPITAL 750,000 13 (III) JEFFERSON COUNTY DEVELOPMENT COUNCIL, 14 INC. 15 (A) JEFFERSON COUNTY ENTERPRISE PARK II - 16 DEVELOPMENT OF APPROXIMATELY 90 ACRES 17 OF VACANT LAND LOCATED NEAR I-80, EXIT 18 73 FOR A BUSINESS PARK, INCLUDING LAND 19 ACQUISITION AND WATER, SEWER AND 20 ROADWAY INFRASTRUCTURE 1,000,000 21 (IV) NORTH CENTRAL REGIONAL PLANNING AND 22 DEVELOPMENT CORPORATION 23 (A) REDEVELOPMENT OF A 30-ACRE BROWNFIELD 24 SITE FORMERLY OCCUPIED BY THE BROCKWAY 25 CLAY PLANT FOR A BUSINESS COMMERCE 26 PARK, INCLUDING LAND ACQUISITION, 27 CONSTRUCTION OF A RAIL SPUR AND WATER, 28 SEWER AND ROADWAY INFRASTRUCTURE 1,000,000 29 (V) PUNXSUTAWNEY BOROUGH 30 (A) ACQUISITION AND DEMOLITION OF BLIGHTED 20070H1589B3496 - 154 -
1 PROPERTY FOR BOROUGH REDEVELOPMENT 500,000
2 (VI) PUNXSUTAWNEY REGIONAL DEVELOPMENT
3 CORPORATION
4 (A) RIKER'S YARD INDUSTRIAL SITE -
5 DEVELOPMENT OF 80 ACRES OF VACANT LAND
6 FOR INDUSTRIAL PURPOSES INCLUDING LAND
7 ACQUISITION AND WATER, SEWER AND
8 ROADWAY INFRASTRUCTURE 1,500,000
9 (B) FACILITY IMPROVEMENTS AND UPGRADES,
10 INCLUDING THE REPLACEMENT OF EMERGENCY
11 POWER GENERATION EQUIPMENT, INFORMATION
12 TECHNOLOGY NECESSARY TO SUPPORT PATIENT
13 CARE AND SAFE MEDICATION ADMINISTRATION
14 AT PUNXSUTAWNEY AREA HOSPITAL 600,000
15 (C) IMPROVEMENT, REHABILITATION AND
16 RENOVATION OF THE MEDICAL/SURGICAL
17 INPATIENT UNIT, INCLUDING INFORMATION
18 TECHNOLOGY ENHANCEMENTS NECESSARY FOR A
19 FACILITY-WIDE TRANSITION TO ELECTRONIC
20 HEALTH RECORDS AND PATIENT-FOCUSED CARE
21 PHILOSOPHY AT PUNXSUTAWNEY AREA
22 HOSPITAL 2,500,000
23 (34) Juniata County (Reserved)
24 (35) Lackawanna County
25 (i) County projects (Reserved) <--
26 (I) COUNTY PROJECTS <--
27 (A) CONSTRUCTION OF NORTH POCONO AREA
28 COMMUNITY CENTER 2,000,000
29 (B) LAND ACQUISITION, INFRASTRUCTURE
30 IMPROVEMENTS AND CONSTRUCTION OF
20070H1589B3496 - 155 -
1 RECREATIONAL AND ATHLETIC FIELD
2 FACILITIES ALONG ROUTE 6, LACKAWANNA
3 COLLEGE 3,000,000
4 (C) CONSTRUCTION AND OTHER RELATED COSTS <--
5 FOR ADDITIONAL IMPROVEMENTS TO ARCHBALD
6 POTHOLE STATE PARK 1,500,000
7 (D) ACQUISITION, CONSTRUCTION AND OTHER <--
8 COSTS RELATED TO A NEW TRAIL ALONG THE
9 LACKAWANNA RIVER 3,000,000
10 (E) CONSTRUCTION AND OTHER COSTS RELATED
11 TO BUILDING A KEYSTONE COLLEGE COMPUTER
12 AND BUSINESS BUILDING 7,000,000
13 (I.1) ARCHBALD BOROUGH
14 (A) CONSTRUCTION, RENOVATIONS AND
15 EXPANSION TO THE NORTHEASTERN
16 EDUCATIONAL INTERMEDIATE UNIT BUILDING 2,000,000
17 (I.1) (I.2) CLARKS GREEN BOROUGH, CLARKS <--
18 SUMMIT BOROUGH, GLENBURN TOWNSHIP AND SOUTH
19 ABINGTON TOWNSHIP
20 (A) INFRASTRUCTURE IMPROVEMENTS AND
21 CONSTRUCTION OF THE ABINGTON AREA
22 COMMUNITY PARK 8,344,000
23 (I.3) COVINGTON TOWNSHIP <--
24 (A) CONSTRUCTION, REDEVELOPMENT AND OTHER
25 RELATED COSTS FOR THE NORTH POCONO HIGH
26 SCHOOL HEALTH AND WELLNESS CENTER 4,000,000
27 (ii) Dunmore Borough
28 (A) Construction and other costs related
29 to building the Dunmore Fire Station 1,400,000
30 (B) Construction, infrastructure,
20070H1589B3496 - 156 -
1 redevelopment and other costs related 2 to building the Dunmore High School 3 Health and Fitness Center 1,000,000 4 (II.1) JESSUP BOROUGH <-- 5 (A) CONSTRUCTION OF TECHNOLOGY FACILITY 6 BUILDING WITHIN THE JESSUP SMALL 7 BUSINESS CENTER/VALLEY VIEW BUSINESS 8 PARK 2,750,000 9 (II.2) MOOSIC BOROUGH 10 (A) ACQUISITION, INFRASTRUCTURE 11 IMPROVEMENTS, DEVELOPMENTS AND 12 CONSTRUCTION OF LACKAWANNA COUNTY 13 BASEBALL STADIUM AND ADJACENT PROPERTY 35,000,000 14 (II.3) OLD FORGE BOROUGH <-- 15 (A) CONSTRUCTION, REDEVELOPMENT AND OTHER 16 RELATED COSTS FOR OLD FORGE COMMUNITY 17 CENTER AND PARK IMPROVEMENTS 2,000,000 18 (II.4) SCOTT TOWNSHIP 19 (A) CONSTRUCTION, REDEVELOPMENT AND OTHER 20 RELATED COSTS FOR THE LAKELAND HIGH 21 SCHOOL HEALTH AND WELLNESS CENTER 2,000,000 22 (iii) City of Scranton 23 (A) Acquisition and other costs related to 24 providing the Vocational Services 25 Community Employment Program and 26 Sheltered Workshop 1,000,000 27 (B) Construction, infrastructure, 28 redevelopment and other costs related 29 to the West Scranton Revitalization 30 Project 3,000,000 20070H1589B3496 - 157 -
1 (C) Construction, redevelopment and other
2 costs related to the Ney NAY Aug Zoo <--
3 renovation and addition 10,000,000
4 (D) CONSTRUCTION FOR THE EXPANSION OF <--
5 JOHNSON COLLEGE 1,985,000
6 (E) INFRASTRUCTURE IMPROVEMENTS AND
7 CONSTRUCTION OF THE MARYWOOD UNIVERSITY
8 ATHLETIC FIELD FACILITY 1,000,000
9 (F) ACQUISITION, INFRASTRUCTURE
10 IMPROVEMENTS AND CONSTRUCTION OF A
11 PARKING GARAGE FOR THE COMMONWEALTH
12 MEDICAL COLLEGE 10,000,000
13 (G) ACQUISITION AND CONSTRUCTION FOR FILM
14 PRODUCTION FACILITY 6,000,000
15 (H) ACQUISITION, INFRASTRUCTURE
16 IMPROVEMENTS AND CONSTRUCTION OF
17 SCRANTON PUBLIC LIBRARY 7,500,000
18 (I) ACQUISITION, INFRASTRUCTURE
19 IMPROVEMENTS, CONSTRUCTION AND RELATED
20 COSTS FOR A NEW SCIENCE CENTER AND
21 ACADEMIC FACILITIES FOR THE UNIVERSITY
22 OF SCRANTON 37,500,000
23 (J) ACQUISITION, INFRASTRUCTURE
24 IMPROVEMENTS, CONSTRUCTION AND RELATED
25 COSTS FOR AN ATHLETIC COMPLEX AND
26 RELATED FACILITIES FOR THE UNIVERSITY
27 OF SCRANTON 10,000,000
28 (K) ACQUISITION, INFRASTRUCTURE
29 IMPROVEMENTS, CONSTRUCTION AND RELATED
30 COSTS FOR THE MULBERRY STREET
20070H1589B3496 - 158 -
1 IMPROVEMENT PROJECT AT THE UNIVERSITY
2 OF SCRANTON 1,500,000
3 (L) CONSTRUCTION, REDEVELOPMENT AND OTHER <--
4 COSTS RELATED TO THE REFURBISHMENT OF
5 THE LACKAWANNA COUNTY COURTHOUSE 7,000,000
6 (M) ACQUISITION, INFRASTRUCTURE
7 IMPROVEMENTS, CONSTRUCTION AND OTHER
8 COSTS RELATED TO THE TECHNOLOGY OFFICE
9 BUILDING PROJECT IN THE MOUNT PLEASANT
10 CORPORATION CENTER 4,000,000
11 (N) ACQUISITION, INFRASTRUCTURE
12 IMPROVEMENTS, CONSTRUCTION AND OTHER
13 COSTS RELATED TO THE TIMMY'S TOWN
14 CENTER CHILDREN'S MUSEUM PROJECT 5,000,000
15 (iv) South Abington Township
16 (A) Acquisition, redevelopment and costs
17 associated with building the South
18 Abington Township Community Center 1,200,000
19 (v) Throop Borough
20 (A) Construction, redevelopment and other
21 costs related to renovation of Throop
22 Hose Company No. 3 1,000,000
23 (B) Construction, acquisition and other
24 costs related to building Throop Hose
25 Company No. 2 1,260,000
26 (36) Lancaster County
27 (i) County projects (Reserved) <--
28 (I) COUNTY PROJECTS <--
29 (A) ACQUISITION, INFRASTRUCTURE,
30 RENOVATIONS, CONSTRUCTION AND OTHER
20070H1589B3496 - 159 -
1 RELATED COSTS FOR THE DEVELOPMENT OF A 2 COMMUNITY HEALTH CENTER AT LANCASTER 3 GENERAL HOSPITAL 2,500,000 4 (B) ACQUISITION, INFRASTRUCTURE, 5 RENOVATIONS, CONSTRUCTION AND OTHER 6 RELATED COSTS FOR THE HISTORIC 7 PRESERVATION TRUST OF LANCASTER COUNTY 8 FOR THE STEVENS-SMITH HISTORIC SITE 9 PROJECT 6,000,000 10 (C) DESIGN, INFRASTRUCTURE, CONSTRUCTION 11 AND OTHER RELATED COSTS FOR THE 12 DEVELOPMENT OF A CAMPUS OF HISTORY FOR 13 THE LANCASTER COUNTY HISTORICAL 14 SOCIETY 9,000,000 15 (D) ACQUISITION, DESIGN, INFRASTRUCTURE, 16 CONSTRUCTION AND OTHER RELATED COSTS OF 17 BUILDING A NEW FACILITY, INCLUDING A 18 PLANETARIUM AND EXHIBITS AT THE NORTH 19 MUSEUM OF NATURAL HISTORY AND SCIENCE 3,000,000 20 (E) SITE PREPARATION, INFRASTRUCTURE, <-- 21 CONSTRUCTION AND OTHER RELATED COSTS 22 FOR THE CROSSINGS AT CONESTOGA CREEK 23 PROJECT, INCLUDING CONSTRUCTION OF AN 24 INNOVATIVE STORM WATER MANAGEMENT AND 25 WETLAND ENHANCEMENT FACILITY 10,000,000 26 (F) ADDITIONAL FUNDS FOR THE COMPLETION OF 27 THE REDEVELOPMENT OF THE HISTORIC WATT 28 & SHAND DEPARTMENT STORE AS PART OF THE 29 LANCASTER COUNTY CONVENTION 30 CENTER/HOTEL PROJECT 6,000,000 20070H1589B3496 - 160 -
1 (G) ACQUISITION, CONSTRUCTION, 2 INFRASTRUCTURE AND OTHER RELATED COSTS 3 TO RENOVATE OUTDOOR RECREATION 4 FACILITIES 5,000,000 5 (ii) City of Lancaster 6 (A) Construction and other related costs 7 for the Thaddeus Stevens Technology 8 Center 4,000,000 9 (B) Infrastructure and other costs 10 associated with Lancaster wireless 11 access 1,000,000 12 (C) INFRASTRUCTURE AND EQUIPMENT TO <-- 13 SUPPORT A NETWORK OF PUBLIC SAFETY 14 SURVEILLANCE CAMERAS THROUGHOUT THE 15 CITY OF LANCASTER FOR THE LANCASTER 16 COMMUNITY SAFETY COALITION 600,000 17 (D) CONSTRUCTION, INFRASTRUCTURE AND OTHER 18 RELATED COSTS TO EXPAND, IMPROVE AND 19 UPDATE FACILITIES AT THE LANCASTER 20 PUBLIC LIBRARY 3,500,000 21 (E) ACQUISITION, INFRASTRUCTURE, 22 DEMOLITION AND OTHER RELATED COSTS FOR 23 THE CONSTRUCTION OF A NEW FACILITY 24 LOCATED WITHIN THE JAMES STREET 25 IMPROVEMENT DISTRICT FOR THE LANCASTER 26 YMCA 6,000,000 27 (F) REDEVELOPMENT AUTHORITY OF THE CITY OF 28 LANCASTER, FOR RESTORATION OF THE 29 HISTORIC MONTGOMERY HOUSE LOCATED IN 30 DOWNTOWN LANCASTER 1,250,000 20070H1589B3496 - 161 -
1 (G) ACQUISITION, CONSTRUCTION AND OTHER <-- 2 RELATED COSTS FOR THE LANCASTER COUNTY 3 PERFORMING ARTS CENTER PROJECT 15,000,000 4 (H) ACQUISITION, CONSTRUCTION, 5 INFRASTRUCTURE AND OTHER RELATED COSTS 6 FOR NEW COUNTY JAIL 25,000,000 7 (I) ACQUISITION, CONSTRUCTION, 8 INFRASTRUCTURE AND OTHER RELATED COSTS 9 FOR A CHILDREN AND YOUTH FACILITY 5,000,000 10 (J) CONSTRUCTION, INFRASTRUCTURE AND OTHER 11 RELATED COSTS TO RENOVATE COUNTY OFFICE 12 BUILDINGS, INCLUDING THE 40 EAST KING 13 STREET FACILITY 10,000,000 14 (K) CONSTRUCTION, INFRASTRUCTURE AND OTHER 15 RELATED COSTS TO RENOVATE THE COUNTY 16 COURTHOUSE AND RESTORE THE OLD COUNTY 17 COURTHOUSE 10,000,000 18 (L) ACQUISITION, CONSTRUCTION, 19 INFRASTRUCTURE AND OTHER RELATED COSTS 20 FOR A NEW FORENSIC CENTER 5,000,000 21 (M) ACQUISITION, RENOVATION AND 22 REHABILITATION OF A FORMER WAREHOUSE 23 FACILITY FOR MANOS HOUSE, A NONPROFIT 24 DRUG AND ALCOHOL REHABILITATION 25 SERVICES ORGANIZATION, FOR REUSE AS A 26 RESIDENTIAL DRUG AND ALCOHOL 27 REHABILITATION PROGRAM AND INDEPENDENT 28 LIVING FACILITY 1,000,000 29 (iii) Columbia Borough 30 (A) Acquisition and renovation of Center 20070H1589B3496 - 162 -
1 for Brain Injured Children at the
2 Lazarus Foundation 913,000
3 (B) ACQUISITION, INFRASTRUCTURE, <--
4 REHABILITATION AND CONSTRUCTION OF THE
5 COLUMBIA FIREMAN'S MUSEUM, AN
6 INTERACTIVE FIREHOUSE MUSEUM 4,625,000
7 (iv) Ephrata Borough
8 (A) Redevelopment of Mountain Springs
9 Hotel property, including related
10 infrastructure 500,000
11 (V) EPHRATA TOWNSHIP <--
12 (A) INFRASTRUCTURE, CONSTRUCTION AND OTHER
13 RELATED COSTS OF CONVERTING 50.8 ACRES
14 OF LAND INTO A COMMUNITY RECREATIONAL
15 PARK 1,530,000
16 (v) (VI) New Holland Borough <--
17 (A) Redevelopment of historic building on
18 Main Street, including related
19 infrastructure 500,000
20 (B) ACQUISITION, INFRASTRUCTURE, <--
21 DEVELOPMENT AND CONSTRUCTION ON AN EAST
22 MAIN STREET VACANT PARCEL FOR THE NEW
23 HOLLAND FARMERS FAIR ASSOCIATION
24 EXHIBIT HALL PROJECT 600,000
25 (VII) EAST COCALICO TOWNSHIP
26 (A) ACQUISITION, INFRASTRUCTURE,
27 REHABILITATION AND CONSTRUCTION OF A
28 COMMUNITY CENTER ON NORTH READING ROAD 4,000,000
29 (VIII) EAST LAMPETER TOWNSHIP
30 (A) INFRASTRUCTURE, CONSTRUCTION AND OTHER
20070H1589B3496 - 163 -
1 RELATED COSTS FOR IMPROVEMENTS TO THE 2 STRASBURG PIKE FRONTAGE OF THE FLORY 3 PARK DEVELOPMENT PROJECT 500,000 4 (IX) HONEY BROOK TOWNSHIP 5 (A) ACQUISITION, INFRASTRUCTURE AND 6 CONSTRUCTION OF A NEW MUNICIPAL 7 BUILDING 1,850,000 8 (X) MANHEIM BOROUGH 9 (A) RENOVATIONS TO THE MANHEIM BOROUGH 10 OFFICE BUILDING, CONSISTING OF 11 CONSTRUCTION OF HANDICAP ACCESSIBILITY 1,300,000 12 (XI) MOUNT JOY BOROUGH 13 (A) INFRASTRUCTURE, REHABILITATION AND 14 CONSTRUCTION OF A SATELLITE BRANCH YMCA 15 FACILITY 4,000,000 16 (XII) WARWICK TOWNSHIP 17 (A) ACQUISITION, INFRASTRUCTURE, 18 REHABILITATION, CONSTRUCTION AND OTHER 19 RELATED COSTS OF CONVERTING 5.5 MILES 20 OF THE FORMER READING AND COLUMBIA 21 RAILROAD CORRIDOR INTO A LINEAR TRAIL 875,000 22 (B) REHABILITATION AND EXPANSION OF THE 23 LITITZ RECREATIONAL CENTER 700,000 24 (37) Lawrence County 25 (i) County projects 26 (A) Construction, acquisition, 27 infrastructure, redevelopment and other 28 costs related to the Lawrence County 29 South Central Route 18 Development 30 District 12,000,000 20070H1589B3496 - 164 -
1 (B) Construction, acquisition, 2 infrastructure, redevelopment and other 3 costs related to the Central Lawrence 4 County Route 422 Corridor Development 5 Area 8,000,000 6 (I.1) ELLWOOD BOROUGH <-- 7 (A) ACQUISITION, DEMOLITION, 8 INFRASTRUCTURE IMPROVEMENTS, 9 CONSTRUCTION AND OTHER COSTS RELATED TO 10 THE ELLWOOD BOROUGH DOWNTOWN 11 REVITALIZATION PROJECT 10,000,000 12 (ii) Elwood City Borough 13 (A) Acquisition, construction, 14 infrastructure and other related costs 15 for the Ellwood Borough East Commerce 16 Park 10,000,000 17 (B) CONSTRUCTION, INFRASTRUCTURE AND OTHER <-- 18 COSTS RELATED TO SCHOOL AND COMMUNITY 19 ATHLETIC FACILITIES IMPROVEMENTS 1,000,000 20 (C) ACQUISITION, CONSTRUCTION, 21 INFRASTRUCTURE, REDEVELOPMENT AND OTHER 22 COSTS RELATED TO ELLWOOD CITY 23 REVITALIZATION AND ECONOMIC DEVELOPMENT 24 PROJECT 4,000,000 25 (II.1) CITY OF NEW CASTLE 26 (A) ACQUISITION, INFRASTRUCTURE 27 IMPROVEMENTS AND CONSTRUCTION FOR THE 28 DOWNTOWN REVITALIZATION PROJECT 10,000,000 29 (B) INFRASTRUCTURE IMPROVEMENTS AND <-- 30 CONSTRUCTION OF A NATIONAL CHARACTER 20070H1589B3496 - 165 -
1 EDUCATION FOUNDATION TRAINING 2 HEADQUARTERS 6,000,000 3 (iii) New Wilmington Borough 4 (A) Acquisition, construction, 5 infrastructure and other costs related 6 to the rehabilitation of downtown New 7 Wilmington 1,500,000 8 (IV) SHENANGO TOWNSHIP <-- 9 (A) ACQUISITION, DEMOLITION, 10 INFRASTRUCTURE IMPROVEMENTS, 11 CONSTRUCTION AND OTHER COSTS RELATED TO 12 THE BIG RUN COMMERCE PARK PROJECT 5,000,000 13 (V) WAMPUM BOROUGH 14 (A) CONSTRUCTION, INFRASTRUCTURE AND OTHER 15 COSTS RELATED TO WAMPUM BOROUGH 16 DOWNTOWN IMPROVEMENTS AND 17 REVITALIZATION 1,000,000 18 (38) Lebanon County 19 (i) County projects (Reserved) 20 (ii) City of Lebanon 21 (A) Acquisition, construction, 22 infrastructure and other related costs 23 for downtown urban corridor 24 revitalization 10,000,000 25 (iii) South Lebanon Township 26 (A) Redevelopment of police department 27 facilities, including construction and 28 related infrastructure 565,000 29 (39) Lehigh County 30 (i) County projects (Reserved) <-- 20070H1589B3496 - 166 -
1 (I) COUNTY PROJECTS <-- 2 (A) INFRASTRUCTURE, DESIGN AND OTHER 3 RELATED COSTS TO THE TRANSITIONING TO A 4 HIGH-PERFORMANCE EMERGENCY SERVICES 5 PROGRAM 5,000,000 6 (B) LEHIGH VALLEY ECONOMIC DEVELOPMENT 7 CORPORATION 8 (I) INFRASTRUCTURE AND REHABILITATION 9 OF AN ASSISTIVE TECHNOLOGY 10 INCUBATOR CENTER 7,000,000 11 (II) INFRASTRUCTURE, CONSTRUCTION AND 12 REHABILITATION OF THE DOWNTOWN 13 AMERICUS CENTER 15,000,000 14 (C) INFRASTRUCTURE, CONSTRUCTION AND OTHER 15 RELATED COSTS OF A WATERFRONT 16 DEVELOPMENT ON FRONT STREET BETWEEN 17 BUCKY BOYLE PARK AND THE TRANSPORTATION 18 MUSEUM 28,000,000 19 (D) ACQUISITION AND RENOVATIONS OF A 20 FACILITY TO BE USED AS A THERAPEUTIC 21 COMMUNITY DEDICATED TO PROVIDING 22 ADDICTION AND MENTAL HEALTH TREATMENT 23 FOR VETERANS 1,250,000 24 (E) LAND ACQUISITION, INFRASTRUCTURE 25 IMPROVEMENTS AND CONSTRUCTION NECESSARY 26 TO MAINTAIN THE COMPETITIVE POSITION OF 27 AN EXISTING BUSINESS ENTITY OR FOR THE 28 DEVELOPMENT OF BUSINESS-READY SITES FOR 29 POTENTIAL BUSINESS TENANTS 1,000,000 30 (F) REHABILITATION AND REDEVELOPMENT OF A 20070H1589B3496 - 167 -
1 BUILDING FOR THE PURPOSES OF AN 2 ASSOCIATION FOR BLIND AND VISUALLY 3 IMPAIRED PROGRAM EXPANSION TO FULLY 4 INTEGRATE A ONE-STOP LOW VISION CENTER, 5 A FULLY EQUIPPED AIDS AND DEVICES STORE 6 AND A STATE-OF-THE-ART TECHNOLOGY 7 CENTER 725,000 8 (ii) City of Allentown 9 (A) Construction, redevelopment and other 10 costs associated with expansion and 11 renovation of Lehigh Valley Hospital 1,000,000 12 (B) Acquisition, redevelopment, 13 streetscape improvement and other costs 14 related to the 7th Street Property 15 Acquisition and Beautification Project 3,000,000 16 (C) Acquisition, redevelopment and other 17 costs related to the Americus Design 18 Center 5,000,000 19 (D) Acquisition, redevelopment and other 20 costs associated with building the 21 Allentown Conference/Convention Center 5,000,000 22 (E) Acquisition, park land reclamation and 23 other costs related to the St. Elmo 24 Park Development 3,000,000 25 (F) Acquisition, redevelopment and other 26 costs associated with the Performing 27 and Visual Arts Center 7,000,000 28 (G) DEMOLITION OF SALS RESTAURANT AND <-- 29 CONSTRUCTION OF A NEW UPSCALE 30 RESTAURANT 500,000 20070H1589B3496 - 168 -
1 (H) ACQUISITION, INFRASTRUCTURE, 2 RENOVATION AND REDEVELOPMENT OF SEVERAL 3 PROPERTIES IN OLD ALLENTOWN INTO ARTIST 4 LOFTS 500,000 5 (I) ACQUISITION OF LAND AND CONSTRUCTION 6 OF A PARK ON A ST. ELMO STREET LOT 500,000 7 (J) CONSTRUCTION, RENOVATIONS AND 8 REDEVELOPMENT OF THE FORMER SCHOENS 9 FURNITURE STORE INTO CLASS A OFFICES, 10 RETAIL AND LOFTS 1,000,000 11 (K) ACQUISITION, INFRASTRUCTURE, 12 RENOVATIONS AND REDEVELOPMENT FOR THE 13 PURPOSES OF CREATING A DOWNTOWN 14 CULTURAL ARTS DISTRICT 1,000,000 15 (L) ACQUISITION, INFRASTRUCTURE, 16 RENOVATIONS AND REDEVELOPMENT OF THE 17 7TH STREET COMMERCIAL CORRIDOR 1,000,000 18 (M) ACQUISITION, INFRASTRUCTURE, 19 REDEVELOPMENT AND CONSTRUCTION OF 20 HOMEOWNERSHIP UNITS LOCATED WITHIN THE 21 HISTORIC OLD ALLENTOWN NEIGHBORHOOD 1,000,000 22 (N) ACQUISITION, INFRASTRUCTURE, 23 DEMOLITION, RENOVATIONS AND 24 REDEVELOPMENT OF BUILDINGS AROUND NEW 25 MUSEUM AND CREATION OF RIVER WALK AND 26 MARINA AT LEHIGH LANDING, PHASE II 1,500,000 27 (O) ACQUISITION, INFRASTRUCTURE, 28 RENOVATION AND REDEVELOPMENT OF 26 29 ACRES LOCATED ON THE LEHIGH STRUCTURAL 30 STEEL SITE FOR MIXED-USE PURPOSES FOR 20070H1589B3496 - 169 -
1 WATERFRONT COMMONS, PHASE I 2,000,000 2 (P) ACQUISITION, INFRASTRUCTURE, 3 CONSTRUCTION AND REDEVELOPMENT OF THE 4 HANOVER ACRES SITE AND PROPERTIES ALONG 5 HANOVER STREET FOR OVERLOOK PARK, PHASE 6 II 2,000,000 7 (Q) INFRASTRUCTURE, RENOVATION AND 8 REDEVELOPMENT OF KEY DOWNTOWN 9 NEIGHBORHOODS FOR OLD ALLENTOWN 10 NEIGHBORHOOD REVITALIZATION PROJECT 2,000,000 11 (R) ACQUISITION, CONSTRUCTION AND OTHER 12 RELATED COSTS TO REDEVELOP THE 13 FAIRGROUNDS FARMERS MARKET AND 19TH 14 STREET 2,000,000 15 (S) CONSTRUCTION, INFRASTRUCTURE AND OTHER 16 RELATED COSTS TO DEVELOP THE CITYWIDE 17 SECURITY CAMERA AND SHOT SPOTTER 18 PROGRAM TO IMPROVE SAFETY AND INCREASE 19 ECONOMIC DEVELOPMENT 2,000,000 20 (T) ACQUISITION AND REDEVELOPMENT OF A 26- 21 ACRE URBAN BROWNFIELD SITE INTO A 22 WATERFRONT COMMUNITY 2,500,000 23 (U) INFRASTRUCTURE, CONSTRUCTION AND 24 REDEVELOPMENT OF THE LEHIGH LANDING 25 OFFICE DEVELOPMENT FOR LEHIGH LANDING, 26 PHASE I 2,500,000 27 (V) CONSTRUCTION AND RENOVATIONS TO THE 28 HISTORIC CIVIC THEATRE 5,000,000 29 (W) CONSTRUCTION, RENOVATIONS AND 30 REDEVELOPMENT OF THE AMERICUS HOTEL 20070H1589B3496 - 170 -
1 INTO A MIXED-USE FACILITY 5,000,000 2 (X) INFRASTRUCTURE, CONSTRUCTION AND 3 REDEVELOPMENT OF VACANT PARKING LOTS 4 AND UNDERUTILIZED BUILDINGS ALONG 7TH 5 STREET IN DOWNTOWN ALLENTOWN 5,000,000 6 (Y) ACQUISITION, INFRASTRUCTURE, 7 RENOVATION AND REDEVELOPMENT OF THE 8 DOWNTOWN POST OFFICE TO A STATE-OF-THE- 9 ART VISUAL ARTS CENTER 7,000,000 10 (Z) ACQUISITION, INFRASTRUCTURE, 11 RENOVATIONS AND REDEVELOPMENT OF A NEW 12 DOWNTOWN EXECUTIVE CONFERENCE CENTER 13 NEXT TO CROWNE PLAZA 7,000,000 14 (AA) INFRASTRUCTURE, CONSTRUCTION AND <-- 15 OTHER RELATED COSTS FOR THE ALLENTOWN 16 SYMPHONY HALL IMPROVEMENTS PROJECT, 17 INCLUDING THE CONSTRUCTION OF A 18 PERFORMING ARTS CENTER 1,250,000 19 (BB) ACQUISITION, INFRASTRUCTURE, <-- 20 CONSTRUCTION, REDEVELOPMENT AND OTHER 21 RELATED COSTS FOR THE RELOCATION OF THE 22 CASA GUADALUPE CENTER 500,000 23 (iii) City of Bethlehem 24 (A) Construction and other related costs 25 for the renovation and expansion of the 26 Lehigh Valley Hospital-Muhlenberg 5,000,000 27 (B) ACQUISITION, INFRASTRUCTURE <-- 28 IMPROVEMENTS, RENOVATIONS AND 29 CONSTRUCTION OF MARTIN TOWER, FORMER 30 WORLD HEADQUARTERS OF BETHLEHEM STEEL 10,000,000 20070H1589B3496 - 171 -
1 (III.1) CATASAUQUA BOROUGH 2 (A) CONSTRUCTION OF EMERGENCY SERVICES 3 BUILDING 1,600,000 4 (iv) Emmaus Borough 5 (A) Construction and acquisition of Emmaus 6 Main Street Parking Deck 5,000,000 7 (B) Construction and acquisition of Emmaus 8 Main Street Community Center 3,000,000 9 (C) TRIANGLE PROJECT, PHASE II, <-- 10 REDEVELOPMENT OF DOWNTOWN, INCLUDING 11 NECESSARY COSTS 500,000 12 (v) Lower Macungie Township 13 (A) Acquisition, construction, 14 infrastructure and other related costs 15 for a new Lower Macungie Fire 16 Department Fire Station 2,000,000 17 (V.1) MACUNGIE BOROUGH <-- 18 (A) ACQUISITION OF LAND ADJACENT TO 19 MACUNGIE MEMORIAL PARK ACROSS SWABIN 20 CREEK, WITH CONSTRUCTION AND 21 INSTALLATION OF A FIRST BRIDGE ACROSS 22 THE CREEK AND RECREATIONAL EQUIPMENT 23 IMPROVEMENT 800,000 24 (V.2) NORTH WHITEHALL TOWNSHIP 25 (A) CONSTRUCTION OF FOUR ATHLETIC FIELDS 2,200,000 26 (B) ACQUISITION, INFRASTRUCTURE 27 IMPROVEMENTS, RENOVATIONS AND 28 CONSTRUCTION OF CAMP FOWLER 3,000,000 29 (vi) Salisbury Township 30 (A) Acquisition, construction, 20070H1589B3496 - 172 -
1 infrastructure and other related costs
2 for the Emergency Department and
3 Imaging Department expansion at Lehigh
4 Valley Hospital and Health Network 5,300,000
5 (VI.1) SLATINGTON BOROUGH <--
6 (A) ACQUISITION, CONSTRUCTION,
7 INFRASTRUCTURE AND OTHER RELATED COSTS
8 FOR A MAIN STREET PARK 285,000
9 (vii) Upper Saucon Township
10 (A) Construction, infrastructure and
11 related costs for the Gambet Center for
12 Innovation and Global Competitiveness 4,000,000
13 (B) CONSTRUCTION OF A BASEBALL STADIUM AT <--
14 DESALES UNIVERSITY 1,750,000
15 (C) CONSTRUCTION OF THE MCSHEA STUDENT
16 UNION CENTER AT DESALES UNIVERSITY 7,500,000
17 (VIII) NORTH WHITEHALL TOWNSHIP
18 (A) CONSTRUCTION AND REDEVELOPMENT OF FOUR
19 STATE-OF-THE-ART ATHLETIC FIELDS FOR
20 USE BY LEHIGH CARBON COMMUNITY COLLEGE
21 STUDENTS AND COMMUNITY YOUTH GROUPS 2,112,000
22 (40) Luzerne County
23 (i) County projects (Reserved) <--
24 (I) COUNTY PROJECTS <--
25 (A) ACQUISITION, INFRASTRUCTURE,
26 CONSTRUCTION AND OTHER RELATED COSTS
27 FOR THE DEVELOPMENT OF THE LANDS AT
28 HILLSIDE FARMS, A MULTITENANT, MIXED-
29 USE COMMUNITY LOCATED IN JACKSON AND
30 KINGSTON TOWNSHIPS 4,000,000
20070H1589B3496 - 173 -
1 (ii) Ashley Borough 2 (A) Construction, infrastructure and other 3 related costs for the Ashley Lane 4 Project 500,000 5 (B) Acquisition, construction and other 6 related costs for the Mill Street Mill 7 Project 500,000 8 (II.1) BUTLER TOWNSHIP AND CONYNGHAM BOROUGH <-- 9 (A) ACQUISITION, CONSTRUCTION, 10 REDEVELOPMENT AND OTHER RELATED COSTS 11 FOR THE VALLEY REGIONAL FIRE AND RESCUE 12 FIREHOUSE 500,000 13 (iii) City of Nanticoke 14 (A) Acquisition, construction, 15 infrastructure and other related costs 16 for mixed-use development on East Main 17 Street 1,000,000 18 (B) Construction, infrastructure and other 19 related costs for the Luzerne County 20 Community College Public Safety 21 Institute 1,000,000 <-- 22 INSTITUTE 35,447,000 <-- 23 (C) Construction and other related costs 24 for downtown parking expansion 2,000,000 25 (D) Acquisition, construction, 26 infrastructure and other related costs 27 for Luzerne County Community College 28 student housing 2,000,000 29 (E) Construction, infrastructure, 30 redevelopment and other costs related 20070H1589B3496 - 174 -
1 to new housing at Susquehanna Coal 2 Building 500,000 3 (F) Acquisition, construction and other 4 related costs for the Lower Broadway 5 Park multi-use project 1,000,000 6 (G) Acquisition, construction, 7 infrastructure and other related costs 8 for the Luzerne County Community 9 College Culinary Arts Building with 10 parking 3,000,000 11 (H) CONSTRUCTION AND RELATED COSTS FOR THE <-- 12 KANJORSKI BUILDING HEALTH SCIENCES 13 CENTER AT LUZERNE COMMUNITY COLLEGE 2,352,000 14 (iv) City of Wilkes-Barre 15 (A) Acquisition, construction, 16 infrastructure and other related costs 17 for the revitalization of the 100 block 18 of South Main Street 13,000,000 19 (B) Construction, infrastructure and other 20 related costs for the renovation of the 21 public square 1,500,000 22 (C) Construction, infrastructure and other 23 related costs for the redevelopment of 24 the Kirby Park recreation area 750,000 25 (D) Construction, infrastructure, 26 redevelopment, abatement of hazardous 27 materials and other costs related to 28 building the Irem Temple Mosque 10,000,000 29 (E) Construction, infrastructure, 30 abatement of hazardous materials and 20070H1589B3496 - 175 -
1 other costs related to Impact Wilkes- 2 Barre 5,000,000 3 (F) Construction, infrastructure, 4 acquisition, abatement of hazardous 5 materials, redevelopment and other 6 costs related to Impact Wilkes-Barre 3,000,000 7 (G) Construction, infrastructure, 8 acquisition, abatement of hazardous 9 materials, redevelopment and other 10 costs relates to Downtown Wilkes-Barre 11 Revitalization Phase II 15,000,000 12 (H) Construction, acquisition, 13 infrastructure, redevelopment, 14 abatement of hazardous materials and 15 other costs related to Hanover 16 Industrial Estates 1,000,000 17 (I) Acquisition, construction, 18 infrastructure and other related costs 19 for a mixed-use facility at the Murray 20 Complex 10,000,000 21 (J) Construction, infrastructure and other 22 related costs for the Coal Street Park 23 Office Complex 7,000,000 24 (K) Acquisition, construction, 25 infrastructure and other related costs 26 for an intermodal transportation 27 facility 4,000,000 28 (L) Construction, infrastructure and other 29 related costs for the Coal Street Park 30 Regional Sports Complex 8,000,000 20070H1589B3496 - 176 -
1 (M) Construction and other related costs 2 for the redevelopment of the Murray 3 Courtwright Complex 5,000,000 4 (N) Construction, acquisition, 5 infrastructure, redevelopment, 6 abatement of hazardous materials and 7 other associated with the West Market 8 Street Mixed-Use Revitalization 9 Project 5,000,000 10 (O) CONSTRUCTION, INFRASTRUCTURE <-- 11 IMPROVEMENTS, ABATEMENT OF HAZARDOUS 12 MATERIALS AND CONSTRUCTION FOR PARKING 13 FACILITIES IN DOWNTOWN WILKES-BARRE 5,000,000 14 (iv.1) Dallas Borough 15 (A) Acquisition, construction, 16 infrastructure and other costs related 17 to the expansion of Back Mountain 18 Cultural Arts Center 500,000 19 (B) ACQUISITION, INFRASTRUCTURE, <-- 20 CONSTRUCTION, RENOVATIONS AND OTHER 21 RELATED COSTS FOR A HEALTH SCIENCE 22 FACILITY AT MISERICORDIA UNIVERSITY 2,750,000 23 (IV.2) DALLAS TOWNSHIP 24 (A) INFRASTRUCTURE, REHABILITATION AND 25 CONSTRUCTION OF A MULTICOMMUNITY INDOOR 26 ATHLETIC FACILITY 500,000 27 (B) ACQUISITION, INFRASTRUCTURE, <-- 28 CONSTRUCTION AND OTHER RELATED COSTS 29 FOR A COMMUNITY RECREATION AND ATHLETIC 30 FACILITY 500,000 20070H1589B3496 - 177 -
1 (v) Hanover Township 2 (A) Construction, acquisition, 3 infrastructure, redevelopment and other 4 costs related to Hanover Crossings 5 Phase III and IV 4,000,000 6 (B) Acquisition, construction, <-- 7 infrastructure and other related costs 8 for Hanover Crossings Phase III and IV 4,000,000 9 (vi) Hazle Township 10 (A) Acquisition, construction, 11 infrastructure and other related costs 12 for the development of a cargo airport 250,000,000 13 (VI.1) CITY OF HAZLETON <-- 14 (A) CONSTRUCTION, INFRASTRUCTURE AND OTHER 15 COSTS RELATED TO THE HAZLETON 16 ELEMENTARY-MIDDLE SCHOOL CASTLE 17 AUDITORIUM 1,000,000 18 (vii) Kingston Borough 19 (A) Construction and other related costs 20 for the Hoyt Library Construction 21 Project 1,500,000 22 (B) RENOVATION, CONSTRUCTION, <-- 23 INFRASTRUCTURE AND RELATED COSTS FOR 24 ELEMENTARY, MIDDLE AND HIGH SCHOOL 25 PROJECTS FOR WYOMING VALLEY WEST SCHOOL 26 DISTRICT 46,500,000 27 (C) INFRASTRUCTURE, CONSTRUCTION, <-- 28 RENOVATIONS AND OTHER RELATED COSTS FOR 29 IMPROVEMENTS TO THE WYOMING SEMINARY 30 CAMPUS 1,450,000 20070H1589B3496 - 178 -
1 (VIII) LEHMAN TOWNSHIP 2 (A) INFRASTRUCTURE, REHABILITATION AND 3 CONSTRUCTION OF A MULTICOMMUNITY INDOOR 4 ATHLETIC FACILITY 500,000 5 (B) INFRASTRUCTURE, CONSTRUCTION AND OTHER <-- 6 RELATED COSTS FOR AN INDOOR COMMUNITY 7 HEALTH CENTER AND RECREATION AND 8 ATHLETIC FACILITY 500,000 9 (IX) PLAINS TOWNSHIP 10 (A) BIRCHWOOD PARK IMPROVEMENT PROJECT 319,000 11 (X) PITTSTON 12 (A) INFRASTRUCTURE IMPROVEMENTS AND 13 CONSTRUCTION FOR CENTER POINT EAST 14 PHASE III PROJECT 7,900,000 15 (B) INFRASTRUCTURE IMPROVEMENTS AND 16 CONSTRUCTION FOR CENTER POINT SOUTH 17 PROJECT 2,400,000 18 (C) INFRASTRUCTURE IMPROVEMENTS AND 19 CONSTRUCTION FOR CENTER POINT WEST 20 PROJECT 3,850,000 21 (D) ACQUISITION, DEMOLITION, 22 INFRASTRUCTURE, CONSTRUCTION AND 23 RELATED COSTS FOR THE DOWNTOWN PITTSTON 24 REDEVELOPMENT PROJECT 10,000,000 25 (E) CONSTRUCTION AND INFRASTRUCTURE FOR 26 SECURITY CONTROL CENTER FOR PITTSTON 27 AREA SCHOOL DISTRICT 635,000 28 (F) ACQUISITION AND CONSTRUCTION FOR THE <-- 29 NORTHEASTERN PENNSYLVANIA REGIONAL 30 NONPROFIT SERVICE CENTER 2,000,000 20070H1589B3496 - 179 -
1 (viii) (XI) Wilkes-Barre Township <-- 2 (A) Construction and other related costs 3 for the renovation of the township 4 municipal building 500,000 5 (B) Construction and other related costs 6 for the township police building 800,000 7 (ix) (XII) Wright Township <-- 8 (A) Construction, infrastructure, 9 abatement of hazardous materials, 10 redevelopment and other costs related 11 to Crestwood Industrial Park 2,500,000 12 (B) Acquisition, construction, <-- 13 infrastructure and other related costs 14 for Crestwood Industrial Park 1,500,000 15 (41) Lycoming County 16 (i) County projects 17 (A) Acquisition, construction, 18 infrastructure and other related costs 19 for the Williamsport Crosscutter's 20 Stadium project 15,000,000 21 (B) DESIGN AND CONSTRUCTION OF A RAIL SPUR <-- 22 TO SUPPORT THE ECONOMIC DEVELOPMENT OF 23 THE NEW MUNCY INDUSTRIAL PARK PHASES 24 II, III AND IV 1,000,000 25 (C) DESIGN, INFRASTRUCTURE, CONSTRUCTION 26 AND OTHER RELATED COSTS FOR THE 27 DEVELOPMENT OF PHASE IV OF THE MUNCY 28 INDUSTRIAL PARK 1,000,000 29 (D) DESIGN, CONSTRUCTION AND OTHER RELATED 30 COSTS TO PROVIDE WATER, SEWER AND ROAD 20070H1589B3496 - 180 -
1 INFRASTRUCTURE WITHIN TIMBER END PARK, 2 A 226-ACRE DESIGNATED KEYSTONE 3 OPPORTUNITY ZONE 1,000,000 4 (E) CONSTRUCTION OF RAIL SPURS AND RELATED <-- 5 TRACK WORK TO PROVIDE RAIL SERVICE TO 6 INDUSTRIAL SITES FOR EXPANSION OF MUNCY 7 INDUSTRIAL PARK, INDUSTRIAL PROPERTIES 8 CORPORATION 3,000,000 9 (F) INFRASTRUCTURE SITE IMPROVEMENTS, <-- 10 CONSTRUCTION AND OTHER NECESSARY COSTS 11 FOR A NEW ARMY/RESERVE CENTER 1,500,000 12 (ii) City of Williamsport 13 (A) Redevelopment and expansion of 14 Susquehanna Health Hospital, including 15 acquisition 10,000,000 16 (B) Acquisition, construction, 17 infrastructure and other related costs 18 for the revitalization of Textrom 19 Lycoming facilities 10,000,000 20 (C) Design and construction of a new 21 intermodal facility, including related 22 infrastructure for the Church Street 23 Transportation Center 4,000,000 24 (D) INFRASTRUCTURE, REDEVELOPMENT, <-- 25 CONSTRUCTION AND OTHER RELATED COSTS 26 FOR THE IMPROVEMENT AND EXPANSION OF 27 THE REACH ROAD INDUSTRIAL PARK 1,250,000 28 (iii) Clinton Township 29 (A) Acquisition, construction, 30 infrastructure and other related costs 20070H1589B3496 - 181 -
1 for the White Deer Recreation Complex 1,000,000
2 (iv) Jersey Shore Borough
3 (A) Redevelopment of the Jersey Shore
4 YMCA, including construction and
5 related infrastructure 1,500,000
6 (B) EXPANSION OF EXISTING DEPARTMENT OF <--
7 CONSERVATION AND NATURAL RESOURCES PINE
8 CREEK RAIL-TRAIL, INCLUDING NECESSARY
9 COSTS 1,000,000
10 (v) Muncy Township
11 (A) Infrastructure within Phase IV of the
12 Muncy Industrial Park 1,000,000
13 (B) Acquisition, construction,
14 infrastructure and other related costs
15 for the Eastern Lycoming County Senior
16 Center 500,000
17 (C) Construction, infrastructure and other
18 related costs for the Halls Station
19 Water Phase I Plus 4,000,000
20 (42) McKean County (Reserved) <--
21 (42) MCKEAN COUNTY <--
22 (I) COUNTY PROJECTS
23 (A) IMPACT KANE - REDEVELOPMENT,
24 REHABILITATION, CONSTRUCTION AND LAND
25 ACQUISITION NECESSARY FOR A
26 COMPREHENSIVE ECONOMIC
27 DEVELOPMENT/COMMUNITY DEVELOPMENT
28 INITIATIVE FOR MUNICIPALITIES LOCATED
29 ALONG THE ROUTE 6 CORRIDOR 10,000,000
30 (B) INFRASTRUCTURE AND OTHER RELATED COSTS
20070H1589B3496 - 182 -
1 ASSOCIATED WITH THE ADDITION OF THE 2 STATE-OF-THE-ART 63-SLICE CT SCANNER 3 THAT PROVIDES THE ONLY SIGNIFICANT 4 DIAGNOSTIC CAPABILITY OF ITS KIND IN 5 THE REGION FOR BRADFORD REGIONAL 6 MEDICAL CENTER 700,000 7 (C) ACQUISITION AND INFRASTRUCTURE RELATED 8 TO THE CONSTRUCTION OF THE ROUTE 219 9 VISITOR/DISCOVERY CENTER 8,200,000 10 (I.1) MCKEAN COUNTY INDUSTRIAL DEVELOPMENT <-- 11 AUTHORITY 12 (A) ACQUISITION, INFRASTRUCTURE AND OTHER 13 RELATED COSTS FOR THE UNIVERSITY OF 14 PITTSBURGH AT BRADFORD AND THE MCKEAN 15 COUNTY INDUSTRIAL DEVELOPMENT AUTHORITY 16 DEVELOPMENT INITIATIVE, INCLUDING 17 RENOVATION AND REHABILITATION OF 18 EXISTING FACILITIES AND CONSTRUCTION OF 19 NEW FACILITIES 10,000,000 20 (II) CITY OF BRADFORD 21 (A) RECREATIONAL FACILITY IMPROVEMENTS, 22 INCLUDING THE RENOVATION OF THE KESSEL 23 ATHLETIC COMPLEX, CONSTRUCTION OF A NEW 24 URBAN TRAIL SYSTEM AND IMPROVEMENTS AND 25 REPAIRS TO THE ICE RINK FACILITY 26 LOCATED IN CALLAHAN PARK 5,000,000 27 (B) DOWNTOWN REDEVELOPMENT, INCLUDING THE 28 RENOVATION OF TWO MAJOR DOWNTOWN 29 BUILDINGS, GATEWAY ENTRANCE AND 30 DOWNTOWN STREETSCAPE IMPROVEMENTS AND 20070H1589B3496 - 183 -
1 THE REVITALIZATION OF A CITY
2 NEIGHBORHOOD THROUGH PROPERTY
3 ACQUISITION, DEMOLITION, REDEVELOPMENT
4 AND RELATED INFRASTRUCTURE
5 IMPROVEMENTS 5,000,000
6 (III) FOSTER TOWNSHIP
7 (A) ENVIRONMENTAL MITIGATION AND
8 INFRASTRUCTURE IMPROVEMENTS, INCLUDING
9 THE INSTALLATION OF NEW UTILITIES AND
10 ROADWAYS AT LAFFERTY HOLLOW INDUSTRIAL
11 PARK 1,500,000
12 (IV) KANE BOROUGH
13 (A) CONSTRUCTION OF A STATE-OF-THE-ART
14 WOMEN'S DIAGNOSTIC BREAST CENTER,
15 INCLUDING INFRASTRUCTURE IMPROVEMENTS
16 AT KANE COMMUNITY HOSPITAL 1,600,000
17 (43) Mercer County
18 (i) County projects (Reserved) <--
19 (I) COUNTY PROJECTS <--
20 (A) INFRASTRUCTURE IMPROVEMENTS AND
21 UTILITY EXTENSIONS WITHIN THE REYNOLDS
22 EAST BUSINESS PARK, A KEYSTONE
23 OPPORTUNITY EXPANSION ZONE, AS PART OF
24 THE PHASE II REDEVELOPMENT PROJECT 600,000
25 (B) CONSTRUCTION OF A NEW MAGISTERIAL
26 DISTRICT COURT FACILITY ALONG
27 BARKEYVILLE ROAD IN PINE TOWNSHIP 625,000
28 (C) CONSTRUCTION OF A NEW, MODERN,
29 MULTITENANT BUILDING IN THE REYNOLDS
30 EAST BUSINESS PARK, A KEYSTONE
20070H1589B3496 - 184 -
1 OPPORTUNITY EXPANSION ZONE 1,000,000 2 (ii) City of Sharon 3 (A) Acquisition, construction, 4 infrastructure and other related costs 5 for downtown Sharon revitalization 3,000,000 6 (iii) City of Hermitage 7 (A) Construction, infrastructure and other 8 costs associated with the Buhl Park 9 Community Center renovation 1,500,000 <-- 10 COMMUNITY CENTER RENOVATION 3,000,000 <-- 11 (iv) Greenville Borough 12 (A) Redevelopment of various industrial 13 properties, including construction 3,000,000 14 (B) Construction costs related to the 15 expansion of the Greenville Borough 16 building 625,000 17 (C) INFRASTRUCTURE, REHABILITATION, <-- 18 CONSTRUCTION AND OTHER RELATED COSTS 19 FOR THIEL COLLEGE ACADEMIC CENTER 20 PROJECT 2,500,000 21 (D) INFRASTRUCTURE, REHABILITATION, 22 CONSTRUCTION AND OTHER RELATED COSTS 23 FOR THE THIEL COLLEGE PASSAVANT CENTER 24 PROJECT 2,500,000 25 (V) SPRINGFIELD, FINDLEY AND EAST LACKAWANNOCK <-- 26 TOWNSHIPS 27 (A) CONSTRUCTION, INFRASTRUCTURE, 28 REDEVELOPMENT AND OTHER RELATED COSTS 29 FOR THE MERCER COUNTY INDUSTRIAL AND 30 BUSINESS PARK 8,000,000 20070H1589B3496 - 185 -
1 (44) Mifflin County (Reserved) <-- 2 (44) MIFFLIN COUNTY <-- 3 (I) COUNTY PROJECTS (RESERVED) 4 (II) GRANVILLE TOWNSHIP 5 (A) ACQUISITION, CONSTRUCTION, <-- 6 INFRASTRUCTURE AND REDEVELOPMENT OF A 7 316-ACRE EXPANSION TO MIFFLIN COUNTY 8 INDUSTRIAL PARK, INCLUDING ACCESS ROAD, 9 WATER, SEWER, GAS, ELECTRIC, RAILROAD 10 AND FIBER OPTIC EXTENSION AND 11 CONNECTIONS 5,000,000 12 (B) (A) INFRASTRUCTURE, CONSTRUCTION AND <-- 13 OTHER RELATED COSTS FOR IMPROVEMENTS 14 AND EXPANSION OF THE GRANVILLE TOWNSHIP 15 SEWAGE TREATMENT FACILITIES DIRECTLY 16 RELATED TO THE MIFFLIN COUNTY 17 INDUSTRIAL PARK EXPANSION PROJECT 5,000,000 18 (III) MIFFLIN COUNTY INDUSTRIAL REDEVELOPMENT 19 CORPORATION 20 (A) CONSTRUCTION AND INFRASTRUCTURE FOR 21 MIXED-USE DEVELOPMENT OF 162 ACRES 22 ALONG ROUTE 322 NEAR THE BURNHAM 23 INTERCHANGE 5,000,000 24 (B) ACQUISITION, CONSTRUCTION, 25 INFRASTRUCTURE AND REDEVELOPMENT OF A 26 316-ACRE EXPANSION TO MIFFLIN COUNTY 27 INDUSTRIAL PARK, INCLUDING ACCESS ROAD, 28 WATER, SEWER, GAS, ELECTRIC, RAILROAD 29 AND FIBER OPTIC EXTENSION AND 30 CONNECTIONS 5,000,000 <-- 20070H1589B3496 - 186 -
1 CONNECTIONS 10,000,000 <-- 2 (C) RENOVATIONS, INCLUDING REMEDIATION, 3 BUILDING REDEVELOPMENT AND 4 INFRASTRUCTURE IMPROVEMENTS IN THE 5 MIFFLIN COUNTY INDUSTRIAL DEVELOPMENT 6 CORPORATION PLAZA, A BROWNFIELD SITE 5,000,000 7 (D) EXPANSION OF UTILITIES AND <-- 8 INFRASTRUCTURE TO THE 316-ACRE MIFFLIN 9 COUNTY INDUSTRIAL PARK 10,000,000 10 (E) (D) ACQUISITION AND PREPARATION FOR <-- 11 REDEVELOPMENT OF BLIGHTED PROPERTIES 12 WITHIN THE DESIGNATED ELM STREET 13 SECTION OF LEWISTOWN BOROUGH 1,000,000 14 (F) (E) ACQUISITION, EXTENSION OF <-- 15 INFRASTRUCTURE AND ROADS AND BUILDING 16 REDEVELOPMENT OF THE FORMER CASE NEW 17 HOLLAND FACILITY 5,000,000 18 (45) Monroe County 19 (i) County projects 20 (A) Acquisition, construction, 21 infrastructure and other related costs 22 for the East Stroudsburg School 23 District Memorial Stadium 1,870,000 24 (B) ACQUISITION, INFRASTRUCTURE <-- 25 IMPROVEMENTS AND CONSTRUCTION OF THE 26 MONROE COUNTY FAMILY HEALTH CENTER 2,000,000 27 (C) ACQUISITION, CONSTRUCTION AND OTHER 28 RELATED COSTS FOR THE POCONO MOUNTAINS 29 WAYFINDING PROGRAM, CONSISTING OF A 30 NETWORK OF DIRECTIONAL SIGNS TO GUIDE 20070H1589B3496 - 187 -
1 THE TRAVELING PUBLIC 1,000,000 2 (D) ACQUISITION, INFRASTRUCTURE, <-- 3 CONSTRUCTION AND OTHER RELATED COSTS 4 FOR THE CONSTRUCTION OF A 10,000- 5 SQUARE-FOOT VISITORS CENTER ON ROUTE 6 6 ADJACENT TO PALMYRA TOWNSHIP BEACH 2,000,000 7 (E) (D) LAND ACQUISITION, INFRASTRUCTURE <-- 8 IMPROVEMENTS AND CONSTRUCTION NECESSARY 9 TO MAINTAIN THE COMPETITIVE POSITION OF 10 AN EXISTING BUSINESS ENTITY OR FOR THE 11 DEVELOPMENT OF BUSINESS-READY SITES FOR 12 POTENTIAL BUSINESS TENANTS 1,000,000 13 (ii) Coolbaugh Township 14 (A) Acquisition, construction, 15 infrastructure and other related costs 16 for the Pocono Mountain Public Library 17 Building 1,000,000 18 (B) Acquisition, construction, <-- 19 infrastructure and other related costs 20 for the Pocono Mountains Corporate 21 Center East 2,000,000 22 (C) (B) Acquisition, construction, <-- 23 infrastructure and other related costs 24 for the Pocono Mountains Corporate 25 Center East 4,000,000 26 (D) (C) Acquisition, construction, <-- 27 infrastructure and other related costs 28 for the Commerce Court Extension 1,250,000 29 (E) (D) Acquisition, construction, <-- 30 infrastructure and other related costs 20070H1589B3496 - 188 -
1 for the Pocono Mountain Economic 2 Development Rail Served Business Park 2,000,000 3 (II.1) DELAWARE WATER GAP BOROUGH <-- 4 (A) RESTORATION OF THE DELAWARE WATER GAP 5 RAILROAD STATION 500,000 6 (B) RESTORATION, INFRASTRUCTURE 7 IMPROVEMENTS AND CONSTRUCTION OF THE 8 CASTLE INN 1,000,000 9 (C) RESTORATION, INFRASTRUCTURE 10 IMPROVEMENTS AND CONSTRUCTION OF THE 11 LAIRD TECHNOLOGY BUILDING 6,000,000 12 (II.2) DELAWARE WATER GAP BOROUGH, EAST 13 STROUDSBURG BOROUGH, STROUDSBURG BOROUGH, 14 SMITHFIELD TOWNSHIP AND STROUD TOWNSHIP 15 (A) INFRASTRUCTURE IMPROVEMENTS FOR 16 TELECOMMUNICATIONS FOR BUSINESS SITES 2,000,000 17 (iii) East Stroudsburg Borough 18 (A) Infrastructure and other related costs 19 to renovate East Stroudsburg High 20 School Memorial Stadium 3,000,000 21 (B) Construction, acquisition, <-- 22 infrastructure, redevelopment and other 23 costs related to the Pocono Mountains 24 Regional Convention Center 37,500,000 25 (B) DEMOLITION AND CONSTRUCTION OF THE <-- 26 INTERNATIONAL BOILER WORKS BUILDINGS 1,800,000 27 (iv) East Stroudsburg Township 28 (A) Acquisition, construction, 29 infrastructure and other related costs 30 for a parking garage adjacent to Pocono 20070H1589B3496 - 189 -
1 Medical Center 10,000,000 2 (B) Construction of Computer Security 3 Research Center at East Stroudsburg 4 University Research and Technology 5 Park 2,000,000 6 (C) CONSTRUCTION AND INFRASTRUCTURE <-- 7 IMPROVEMENTS FOR THE WORLD-CLASS 8 SYNCHRONOUS DATA CENTER 3,000,000 9 (v) East Stroudsburg, Stroudsburg and Middle 10 Smithfield Townships 11 (A) Acquisition, construction, 12 infrastructure and other related costs 13 for rehabilitation of East Stroudsburg 14 to Delaware Water Lap GAP Rail Line 1,250,000 <-- 15 (VI) PALMYRA TOWNSHIP <-- 16 (A) INFRASTRUCTURE IMPROVEMENTS AND 17 CONSTRUCTION OF THE LAKE WALLENPAUPACK 18 VISITORS CENTER 2,000,000 19 (VI) (RESERVED) <-- 20 (VII) PARADISE TOWNSHIP 21 (A) ACQUISITION OF A FISH HATCHERY FOR A 22 PARK AND EDUCATIONAL CENTER 1,500,000 23 (vi) (VIII) Pocono, Paradise and Jackson <-- 24 Townships 25 (A) Construction of bathrooms for persons 26 with disabilities, field improvements 27 and related infrastructure for 28 Challenger Program 100,000 29 (IX) SMITHFIELD TOWNSHIP <-- 30 (A) CONSTRUCTION, ACQUISITION, 20070H1589B3496 - 190 -
1 INFRASTRUCTURE, REDEVELOPMENT AND OTHER 2 COSTS RELATED TO THE POCONO MOUNTAINS 3 REGIONAL CONVENTION CENTER 37,500,000 4 (B) ACQUISITION, INFRASTRUCTURE <-- 5 IMPROVEMENTS AND CONSTRUCTION OF THE 6 WESTFIELD MEDICAL CENTER PROJECT 2,500,000 7 (C) ACQUISITION AND OTHER COSTS RELATED TO 8 THE VIEWSCAPE PRESERVATION PROJECT ON 9 MOSIERS KNOB ROAD 2,000,000 10 (D) CONSTRUCTION AND OTHER RELATED COSTS 11 FOR A NEW MUNICIPAL COMPLEX 500,000 12 (vii) (X) Stroudsburg Borough <-- 13 (A) Acquisition, restoration and expansion 14 of the Sherman Theater 1,500,000 <-- 15 OF THE SHERMAN THEATER 3,000,000 <-- 16 (B) ACQUISITION AND RENOVATIONS TO 17 DOWNTOWN STROUDSBURG HOTEL AND 18 CONSTRUCTION OF ASSOCIATED PARKING 19 GARAGE 5,000,000 20 (C) RENOVATIONS OF ROSS-STULGAITIS 21 STADIUM 1,000,000 22 (XI) POCONO MOUNTAINS ECONOMIC DEVELOPMENT 23 CORPORATION 24 (A) TELECOMMUNICATIONS INFRASTRUCTURE 25 PROJECTS IN MIDDLE SMITHFIELD AND PRICE 26 TOWNSHIPS 2,000,000 27 (B) ACQUISITION, INFRASTRUCTURE AND OTHER 28 RELATED COSTS FOR THE REDEVELOPMENT OF 29 SITES ON THE WEST END OF MONROE COUNTY 2,500,000 30 (46) Montgomery County 20070H1589B3496 - 191 -
1 (i) County projects (Reserved) <--
2 (I) COUNTY PROJECTS <--
3 (A) ACQUISITION, CONSTRUCTION,
4 INFRASTRUCTURE AND OTHER RELATED COSTS
5 FOR THE MONTGOMERY COUNTY EXPO CENTER 19,000,000
6 (B) INFRASTRUCTURE IMPROVEMENTS AND
7 CONSTRUCTION FOR THE MANOR COLLEGE
8 DENTAL HEALTH CENTER 500,000
9 (C) ABATEMENT OF HAZARDOUS MATERIALS, <--
10 INFRASTRUCTURE, CONSTRUCTION AND OTHER
11 RELATED COSTS FOR THE REDEVELOPMENT OF
12 THE BRIGHT HOPE PUBLIC HOUSING
13 FACILITY, MONTGOMERY COUNTY HOUSING
14 AUTHORITY 3,000,000
15 (D) MONTGOMERY COUNTY COMMUNITY COLLEGE
16 (I) ROOF REPLACEMENT ON 101 COLLEGE
17 DRIVE BUILDING 500,000
18 (II) EXTERIOR DOOR REPLACEMENTS ON
19 CENTRAL CAMPUS FACILITIES 135,000
20 (III) CONSTRUCTION OF A WALKWAY AROUND
21 THE PERIMETER OF CENTRAL CAMPUS 323,000
22 (IV) RENOVATIONS AND OTHER RELATED
23 COSTS FOR THE RELOCATION AND
24 EXPANSION OF THE THEATER FACILITY 400,000
25 (ii) Abington Township
26 (A) Acquisition, construction and other
27 related costs for the renovation of the
28 Abington Community Center 1,000,000
29 (B) Acquisition, construction and other
30 related costs to develop a civic
20070H1589B3496 - 192 -
1 facility as part of the Roslyn 2 Redevelopment Program 12,000,000 3 (C) Construction and other related costs 4 for the renovation of the Ardsley 5 Community Center 1,000,000 6 (iii) Ambler Borough 7 (A) Construction and other related costs 8 for the redevelopment of Main Street 10,000,000 9 (B) CONSTRUCTION, RENOVATION, <-- 10 INFRASTRUCTURE AND OTHER RELATED COSTS 11 OF A NEW FIREHOUSE 2,000,000 12 (C) ACQUISITION, SITE PREPARATION AND 13 OTHER RELATED COSTS FOR REDEVELOPMENT 14 OF KEASBEY AND MATTISON SITE, A 15 RESIDENTIAL DEVELOPMENT 7,500,000 16 (D) CONSTRUCTION AND RENOVATIONS FOR THE 17 KEASBEY AND MATTISON BOILER HOUSE 18 PROJECT 2,000,000 19 (III.1) BALA CYNWYD 20 (A) CONSTRUCTION AND LAND DEVELOPMENT 21 PROJECT AT 211 BELMONT AVENUE 11,000,000 22 (III.2) BRIDGEPORT BOROUGH 23 (A) INFRASTRUCTURE IMPROVEMENTS, 24 CONSTRUCTION AND RELATED COSTS 25 ASSOCIATED WITH BRIDGEVIEW DEVELOPMENT 4,500,000 26 (III.3) CHELTENHAM TOWNSHIP 27 (A) CONSTRUCTION OF EXPANSION OF 28 SETTLEMENT MUSIC SCHOOL, INCLUDING 29 PARKING FACILITY 3,000,000 30 (B) CONSTRUCTION OF BUNKER FOR MCKINLEY 20070H1589B3496 - 193 -
1 FIRE COMPANY 500,000 2 (C) CONSTRUCTION OF BUNKER FOR LAMOTT FIRE 3 COMPANY 500,000 4 (D) CONSTRUCTION OF PATIENT CENTER FOR 5 HOPE LODGE CANCER FACILITY 1,200,000 6 (E) ENGINEERING AND CONSTRUCTION OF <-- 7 CRESHEIM MULTIUSE TRAIL BETWEEN VALLEY 8 GREEN IN FAIRMONT PARK IN PHILADELPHIA 9 AND FORT WASHINGTON STATE PARK 2,500,000 10 (III.4) CONSHOHOCKEN BOROUGH 11 (A) INFRASTRUCTURE IMPROVEMENTS AND 12 HAZARDOUS MATERIALS ABATEMENT FOR THE 13 LEELAND MANSION PROJECT 2,250,000 14 (III.5) EAST NORRITON TOWNSHIP <-- 15 (A) ACQUISITION, CONSTRUCTION, 16 INFRASTRUCTURE, REDEVELOPMENT AND OTHER 17 COSTS RELATED TO THE INNOVATIVE LIFE 18 SCIENCES CENTER 10,000,000 19 (III.5) (III.6) GLENSIDE <-- 20 (A) DEVELOPMENT AND CONSTRUCTION OF 21 ARCADIA UNIVERSITY CAMPUS COMMONS AND 22 PARKING FACILITY 2,000,000 23 (B) INFRASTRUCTURE IMPROVEMENTS AND <-- 24 CONSTRUCTION FOR THE ARCADIA UNIVERSITY 25 STUDENT AND COMMUNITY CENTER PROJECT 10,000,000 26 (iv) Green Lane Borough 27 (A) Green Lane Borough sidewalk 28 installation 750,000 29 (v) Jenkintown Borough 30 (A) Construction and other related costs 20070H1589B3496 - 194 -
1 for the Southern Gateway multilevel 2 parking garage 6,000,000 3 (vi) Lansdale Borough 4 (A) Infrastructure and other related costs 5 for the construction of a multipurpose 6 senior community center 1,000,000 7 (B) CONSTRUCTION OF PHASE II OF THE <-- 8 LANSDALE PERFORMING ARTS CENTER, 9 INCLUDING ADDITIONS AND RENOVATIONS TO 10 THE FORMER MASONIC HALL 3,300,000 11 (C) CONSTRUCTION AND NECESSARY COSTS FOR <-- 12 THE PEAK COMMUNITY CENTER 4,500,000 13 (vii) Limerick Township 14 (A) Construction of a child care center at 15 the Spring Valley YMCA, including land 16 acquisition 2,500,000 17 (VII.1) LOWER GWYNEDD TOWNSHIP <-- 18 (A) CONSTRUCTION, INFRASTRUCTURE AND OTHER 19 COSTS ASSOCIATED WITH THE DOWNTOWN 20 STREETSCAPE IMPROVEMENT AND 21 BEAUTIFICATION PROJECT 500,000 22 (VII.2) LOWER MERION TOWNSHIP 23 (A) INFRASTRUCTURE DEVELOPMENT AND 24 CONSTRUCTION FOR 211 BELMONT PROJECT 4,000,000 25 (B) ACQUISITION, INFRASTRUCTURE 26 IMPROVEMENTS, CONSTRUCTION AND RELATED 27 COSTS FOR THE SAINT JOSEPH'S UNIVERSITY 28 CAMPUS-WIDE PROJECTS 15,000,000 29 (C) RENOVATIONS AND CONSTRUCTION FOR 30 GLADWYNE LIBRARY 2,000,000 20070H1589B3496 - 195 -
1 (D) ACQUISITION, INFRASTRUCTURE, <--
2 REHABILITATION, CONSTRUCTION AND OTHER
3 COSTS RELATED TO THE REDEVELOPMENT OF
4 THE ARDMORE TRAIN STATION, INCLUDING
5 THE ABATEMENT OF HAZARDOUS MATERIALS 15,000,000
6 (VII.3) LOWER POTTSGROVE TOWNSHIP <--
7 (A) RENOVATIONS, CONSTRUCTION AND OTHER
8 RELATED COSTS FOR THE REHABILITATION OF
9 THE SUNNYBROOK BALLROOM AND CONVENTION
10 CENTER 3,000,000
11 (viii) Lower Providence Township
12 (A) Restoration of John James Audubon
13 Center, including construction and <--
14 CENTER, INCLUDING EXPANSION, <--
15 CONSTRUCTION OF A NEW MUSEUM AND
16 related infrastructure 6,000,000
17 (B) ACQUISITION, REDEVELOPMENT, <--
18 CONSTRUCTION AND OTHER RELATED COSTS
19 FOR THE CONVERSION OF A BROWNFIELD SITE
20 INTO A VELODROME AND EVENTS CENTER 10,000,000
21 (ix) Marlborough Township
22 (A) Acquisition, related infrastructure
23 and restoration of Wetzel's Mill and
24 Unami Creek Park area, including
25 construction 1,000,000
26 (x) Norristown Borough
27 (A) Acquisition, construction,
28 infrastructure and other related costs
29 for the Cultural Arts Center 3,000,000
30 (B) ACQUISITION, REDEVELOPMENT AND <--
20070H1589B3496 - 196 -
1 CONSTRUCTION OF THE LOGAN SQUARE 2 ENTERPRISE/REDEVELOPMENT AREA 10,000,000 3 (C) ACQUISITION, DEMOLITION, 4 INFRASTRUCTURE IMPROVEMENTS AND 5 CONSTRUCTION OF THE STONEY CREEK MIXED- 6 INCOME HOUSING DEVELOPMENT 2,000,000 7 (D) ACQUISITION, INFRASTRUCTURE 8 IMPROVEMENTS AND CONSTRUCTION OF THE 9 NICOLET COMPLEX 3,500,000 10 (E) LAND ACQUISITION, INFRASTRUCTURE 11 IMPROVEMENTS AND CONSTRUCTION FOR THE 12 RIVERFRONT REDEVELOPMENT DISTRICT 13 PROJECT 5,000,000 14 (F) REDEVELOPMENT AND REVITALIZATION OF 15 THE LOGAN SQUARE 16 ENTERPRISE/REDEVELOPMENT AREA 10,000,000 17 (G) ACQUISITION, INFRASTRUCTURE <-- 18 IMPROVEMENTS AND OTHER COSTS RELATED TO 19 THE AMATEX/NORFAB RELOCATION AND 20 IMPROVEMENT PROJECT 2,700,000 21 (X.1) BOROUGH OF POTTSTOWN <-- 22 (A) ACQUISITION AND REDEVELOPMENT OF THE 23 FORMER BETHLEHEM STEEL SITE 17,500,000 24 (B) ACQUISITION, REDEVELOPMENT, 25 CONSTRUCTION AND OTHER RELATED COSTS 26 FOR THE HIGH AND EVANS STREET PROPERTY 27 AND LESSIG LOT 5,000,000 28 (xi) Pennsburg, Red Hill and Green Lane 29 Boroughs, Marlborough and Upper Hanover 30 Townships 20070H1589B3496 - 197 -
1 (A) Construction, infrastructure, land 2 acquisition and other related costs for 3 the Greater Upper Perkiomen Valley 4 Economic Development Project 2,000,000 5 (xii) Red Hill Borough 6 (A) Expansion of Upper Perkiomen Valley 7 Public Library, including 8 infrastructure and other related costs 1,000,000 9 (XII.1) BOROUGH OF SCHWENKSVILLE <-- 10 (A) ACQUISITION, INFRASTRUCTURE, 11 CONSTRUCTION AND RELATED COSTS FOR 12 IMPROVEMENTS AND REDEVELOPMENT ON THE 13 EAST SIDE OF MAIN STREET BETWEEN 14 CENTENNIAL STREET AND PERKIOMEN AVENUE 4,000,000 15 (xiii) Upper Hanover Township 16 (A) Acquisition, construction and related 17 infrastructure for Upper Perkiomen 18 Valley YMCA 4,000,000 19 (B) Construction of outpatient medical 20 facility and medical office building at 21 St. Luke's Quakertown Hospital, 22 including related infrastructure 1,000,000 23 (XIV) UPPER MERION TOWNSHIP <-- 24 (A) INFRASTRUCTURE IMPROVEMENTS AND 25 CONSTRUCTION FOR CORSAIR II 5,000,000 26 (B) ACQUISITION, CONSTRUCTION, 27 INFRASTRUCTURE, REDEVELOPMENT AND OTHER 28 COSTS RELATED TO THE UPPER MERION 29 RECREATIONAL FACILITY 4,000,000 30 (XV) UPPER MORELAND TOWNSHIP 20070H1589B3496 - 198 -
1 (A) CONSTRUCTION AND DEVELOPMENT OF A 2 MULTIPURPOSE LIGHTED SYNTHETIC TURF 3 ATHLETIC FIELD 500,000 4 (xiv) (XVI) West Norriton Township <-- 5 (A) Acquisition and related costs for the 6 construction of the Audubon area YMCA 3,000,000 7 (XVII) MONTGOMERY COUNTY INDUSTRIAL <-- 8 DEVELOPMENT AUTHORITY 9 (A) SITE PREPARATION, CONSTRUCTION AND 10 INFRASTRUCTURE IMPROVEMENTS FOR 11 ECONOMIC DEVELOPMENT AT RUTH AND 12 CLEMENS ROADS, LOWER SALFORD TOWNSHIP 5,000,000 13 (B) LAND ACQUISITION, INFRASTRUCTURE AND 14 CONSTRUCTION OF A NEW ALMAC FACILITY 15 FOR ECONOMIC DEVELOPMENT AT FRETZ AND 16 WAMBOLD 20,000,000 17 (47) Montour County (Reserved) <-- 18 (47) MONTOUR COUNTY <-- 19 (I) COUNTY PROJECTS 20 (A) ACQUISITION AND DEVELOPMENT OF A 21 COUNTY INDUSTRIAL PARK 1,000,000 22 (B) INFRASTRUCTURE, CONSTRUCTION AND OTHER <-- 23 RELATED COSTS FOR THE DEVELOPMENT AND 24 CONSTRUCTION OF A NEW GEISINGER 25 LABORATORY MEDICINE BUILDING 20,000,000 26 (C) INFRASTRUCTURE, CONSTRUCTION AND OTHER 27 RELATED COSTS FOR THE DEVELOPMENT AND 28 CONSTRUCTION OF A NEW GEISINGER GENOMIC 29 MEDICINE INSTITUTE 5,000,000 30 (II) DANVILLE BOROUGH 20070H1589B3496 - 199 -
1 (A) LAND ACQUISITION, INFRASTRUCTURE 2 IMPROVEMENTS AND CONSTRUCTION OF A 3 PARKING GARAGE 1,000,000 4 (48) Northampton County 5 (i) County projects 6 (A) Construction, redevelopment and other 7 related costs to build the SteelSax 8 Performing Arts and Broadcast 9 Center/Events Center 12,000,000 10 (B) INFRASTRUCTURE IMPROVEMENTS, <-- 11 RENOVATIONS AND CONSTRUCTION FOR THE 12 LEHIGH HEAVY FORGE COMPANY INDUSTRIAL 13 AREA 10,000,000 14 (C) LAND ACQUISITION, INFRASTRUCTURE 15 IMPROVEMENTS AND CONSTRUCTION NECESSARY 16 TO MAINTAIN THE COMPETITIVE POSITION OF 17 AN EXISTING BUSINESS ENTITY OR FOR THE 18 DEVELOPMENT OF BUSINESS-READY SITES FOR 19 POTENTIAL BUSINESS TENANTS 1,000,000 20 (II) PEN ARGYL BOROUGH 21 (A) INFRASTRUCTURE IMPROVEMENTS AND 22 CONSTRUCTION OF WEONA PARK POOL AND 23 BATH HOUSE FACILITY 10,000,000 24 (B) LAND ACQUISITION, INFRASTRUCTURE 25 IMPROVEMENTS AND CONSTRUCTION OF A 26 GOVERNMENT CENTER/FIRE STATION 5,000,000 27 (C) CONSTRUCTION OF A COMMUNITY CENTER, <-- 28 INCLUDING NECESSARY COSTS 5,000,000 29 (III) BANGOR BOROUGH 30 (A) ACQUISITION, INFRASTRUCTURE 20070H1589B3496 - 200 -
1 IMPROVEMENTS AND CONSTRUCTION OF A 2 GARAGE AND SALT STORAGE FACILITY 2,500,000 3 (B) ACQUISITION AND CONSTRUCTION OF A 4 MUNICIPAL COMPLEX 5,000,000 5 (C) ACQUISITION AND RENOVATIONS TO THE 6 COLONIAL HOTEL 500,000 7 (D) RENOVATIONS OF THE TRUST BUILDING 500,000 8 (IV) CITY OF BETHLEHEM 9 (A) CONSTRUCTION OF SOUTH MAIN STREET 10 PARKING GARAGE 5,000,000 11 (B) CONSTRUCTION OF 4TH AND BROADWAY 12 PARKING GARAGE 3,000,000 13 (C) ACQUISITION, INFRASTRUCTURE 14 IMPROVEMENTS AND CONSTRUCTION OF THE 15 FARR BUILDING 1,000,000 16 (D) RENOVATIONS AND CONSTRUCTION OF THE 17 STOCK HOUSE VISITORS CENTER 1,000,000 18 (E) RENOVATIONS TO THE FOWLER FAMILY 19 SOUTHSIDE CENTER, NORTHAMPTON COMMUNITY 20 COLLEGE 1,000,000 21 (F) INFRASTRUCTURE IMPROVEMENTS AND 22 CONSTRUCTION OF LEHIGH UNIVERSITY 23 SCIENCE AND TECHNOLOGY INFRASTRUCTURE 10,000,000 24 (G) CONSTRUCTION, REDEVELOPMENT AND OTHER 25 RELATED COSTS TO BUILD A FACILITY TO 26 EMPLOY PERSONS WITH DISABILITIES 500,000 27 (H) SITE IMPROVEMENT, RENOVATION AND <-- 28 EXPANSION OF INCUBATOR FACILITY FOR BEN 29 FRANKLIN TECHVENTURES 7,500,000 30 (I) CONSTRUCTION FOR REPAIR AND 20070H1589B3496 - 201 -
1 RESTORATION OF SOUTH BETHELEHEM FLOOD 2 CONTROL SYSTEM 500,000 3 (V) BETHLEHEM TOWNSHIP 4 (A) ACQUISITION, INFRASTRUCTURE 5 IMPROVEMENTS AND CONSTRUCTION FOR THE 6 ST. LUKE'S RIVERSIDE HEALTH CAMPUS 15,000,000 7 (B) RENOVATIONS AND INFRASTRUCTURE 8 IMPROVEMENTS TO THE BOILER AND COOLING 9 TOWERS, NORTHAMPTON COMMUNITY COLLEGE 500,000 10 (C) RENOVATIONS AND EXPANSION OF THE 11 AUTOMOTIVE TECHNOLOGY PROGRAM FACILITY, 12 NORTHAMPTON COMMUNITY COLLEGE 1,000,000 13 (VI) CITY OF EASTON 14 (A) ACQUISITION, REDEVELOPMENT AND 15 CONSTRUCTION OF A PARKING GARAGE TO 16 SERVE THE BUSINESS DISTRICT, BUSHKILL 17 CREEK AND LAFAYETTE COLLEGE AREAS 2,250,000 18 (B) INFRASTRUCTURE, REDEVELOPMENT AND 19 CONSTRUCTION OF A NORTHAMPTON COUNTY 20 GOVERNMENT CENTER PARKING GARAGE 3,500,000 21 (C) RENOVATION OF A COMMERCIAL FACILITY 22 AND CONSTRUCTION OF EXHIBITS FOR THE 23 NORTHAMPTON COUNTY HISTORICAL AND 24 GENEALOGICAL SOCIETY MUSEUM 4,500,000 25 (D) INFRASTRUCTURE, DEMOLITION, 26 CONSTRUCTION AND OTHER RELATED COSTS 27 FOR THE DELAWARE TERRACE AND DELAWARE 28 TERRACE ANNEX COMMUNITY DEVELOPMENT 29 PROJECT, CONSISTING OF REHABILITATION 30 OF A BLIGHTED HOUSING COMPLEX 2,000,000 20070H1589B3496 - 202 -
1 (E) CONSTRUCTION OF A MULTILEVEL PARKING 2 GARAGE IN THE VICINITY OF THE 3 NORTHAMPTON COUNTY COURTHOUSE 5,000,000 4 (VII) GLENDON BOROUGH 5 (A) CONSTRUCTION OF INFRASTRUCTURE TO 6 SERVE INDUSTRIAL PARK AND COMMUNITY 7 DEVELOPMENT 500,000 8 (VIII) NORTH CATASAUQUA BOROUGH 9 (A) RENOVATIONS OF BOROUGH HALL SENIOR 10 CENTER AND COMMUNITY MULTIPURPOSE 11 FACILITIES 500,000 <-- 12 FACILITIES 650,000 <-- 13 (ii) (IX) Palmer Township <-- 14 (A) Acquisition, construction and other 15 related costs for the National High 16 School Sports Hall of Fame Museum 5,000,000 17 (B) INFRASTRUCTURE AND CONSTRUCTION OF AN <-- 18 INTERCHANGE AT THE INTERSECTION OF 19 ROUTE 33 AND MAIN STREET IN PALMER 20 TOWNSHIP 14,000,000 21 (C) SITE PREPARATION, INFRASTRUCTURE AND 22 CONSTRUCTION OF FACILITIES FOR 23 COMMERCIAL AND INDUSTRIAL USE 15,000,000 24 (X) WILSON BOROUGH 25 (A) INFRASTRUCTURE, SITE PREPARATION AND 26 REMEDIATION, REHABILITATION AND 27 HISTORIC RECONSTRUCTION FOR COMMUNITY 28 DEVELOPMENT 5,000,000 29 (B) ACQUISITION, INFRASTRUCTURE 30 IMPROVEMENTS AND CONSTRUCTION OF DIXIE 20070H1589B3496 - 203 -
1 LOFTS 5,000,000
2 (49) Northumberland County
3 (i) County projects (Reserved) <--
4 (I) COUNTY PROJECTS <--
5 (A) ACQUISITION, INFRASTRUCTURE,
6 CONSTRUCTION AND OTHER RELATED COSTS
7 FOR THE MOUNT CARMEL AREA RECREATION
8 COMPLEX 2,000,000
9 (I.1) CITY OF SUNBURY
10 (A) ACQUISITION, INFRASTRUCTURE,
11 CONSTRUCTION, EQUIPMENT AND OTHER
12 RELATED COSTS FOR THE CONSTRUCTION OF A
13 NEW EMERGENCY DEPARTMENT AT THE SUNBURY
14 COMMUNITY HOSPITAL 5,000,000
15 (B) ACQUISITION, INFRASTRUCTURE,
16 CONSTRUCTION, EQUIPMENT AND OTHER
17 RELATED COSTS FOR RENOVATIONS TO THE
18 RADIOLOGY SUITE AT THE SUNBURY
19 COMMUNITY HOSPITAL 3,000,000
20 (I.2) COAL TOWNSHIP
21 (A) CONSTRUCTION AND OTHER COSTS RELATED
22 TO SHAMOKIN AREA COMMUNITY HOSPITAL
23 IMPROVEMENTS 500,000
24 (ii) Milton Borough
25 (A) Acquisition, construction,
26 infrastructure and other related costs
27 for a new Milton Public Library 1,000,000
28 (B) INFRASTRUCTURE, REHABILITATION AND <--
29 CONSTRUCTION FOR IMPROVEMENTS TO MARSH
30 ROAD IN THE VICINITY OF THE MILTON AREA
20070H1589B3496 - 204 -
1 INDUSTRIAL PARK 2,000,000 2 (iii) Point Township 3 (A) Acquisition, construction, 4 infrastructure and other related costs 5 for a renewable energy plant 1,000,000 6 (B) Construction and other related costs 7 for the SunPoint Renewable Energy 8 Project 1,000,000 <-- 9 PROJECT, INCLUDING ANY NECESSARY <-- 10 TRANSPORTATION-RELATED INFRASTRUCTURE 11 IMPROVEMENTS 3,000,000 12 (IV) CITY OF SHAMOKIN 13 (A) CONSTRUCTION OF A MINING TECHNOLOGY 14 AND TRAINING CENTER 2,000,000 15 (50) Perry County 16 (i) County projects (Reserved) 17 (ii) Penn Township 18 (A) Construction of new facility to house 19 preschool program and after school 20 program at the Early Education Center 500,000 21 (iii) Spring Township 22 (A) Audubon Hawk Watch expansion, 23 including construction of viewing area 24 for persons with disabilities and 25 related infrastructure improvements 275,000 26 (51) Philadelphia County 27 (i) County projects 28 (A) Construction, infrastructure and other 29 related costs for the expansion and 30 rehabilitation of Children's Crisis 20070H1589B3496 - 205 -
1 Treatment Center 4,000,000 2 (ii) City of Philadelphia 3 (A) Construction and other related costs 4 for the University of Pennsylvania 5 Research Center 16,000,000 6 (B) Redevelopment and other costs related 7 to the Inter-Community Development 8 Corporation northwest neighborhood 9 streetscape improvements 1,500,000 10 (C) Construction, redevelopment and other 11 costs associated with the Academy of 12 Natural Science Exhibit 500,000 13 (D) Construction, infrastructure, 14 redevelopment and other related costs 15 to upgrade and renovate the Curtis 16 Institute for Music 20,000,000 17 (E) Construction and other related costs 18 for the Nueva Jerusalem mixed-use 19 facility 1,500,000 20 (F) Construction, infrastructure and other 21 related costs for the Pastore Unidos 22 Por Filadelfia project related to 23 minority and senior programming 500,000 24 (G) Construction and other related costs 25 for the renovation and expansion of the 26 Columbia North Community YMCA 3,600,000 27 (H) Construction, infrastructure and other 28 related costs for the Betsy Ross House 500,000 29 (I) Infrastructure and other costs related 30 to the Hunting Park 21st Century 20070H1589B3496 - 206 -
1 Community and Learning Center 1,000,000 2 (J) Construction, infrastructure and other 3 related costs for the Stenton Service 4 Wing Restoration Project 1,000,000 5 (K) Construction, redevelopment and other 6 costs related to the new Pleasant 7 Playground building 1,000,000 8 (L) Construction, acquisition, demolition, <-- 9 REDEVELOPMENT and other costs 10 associated with South Philadelphia 11 Service Housing 10,000,000 <-- 12 (M) Construction and other related costs 13 for the renovation of International 14 House 8,000,000 15 (N) Acquisition, construction and other 16 related costs for the redevelopment of 17 the Historic John Grass Company 18 Building 700,000 19 (O) Construction ACQUISITION, <-- 20 CONSTRUCTION, infrastructure and other 21 related costs for the Norris Square 22 Children's Center 500,000 23 (P) Construction and other related costs 24 for North Philadelphia retail 25 corridors 4,000,000 26 (Q) Construction, infrastructure and other 27 related costs for a regional emergency 28 services facility 30,000,000 29 (R) Construction, infrastructure and other 30 related costs for North Philadelphia 20070H1589B3496 - 207 -
1 recreation 5,000,000 2 (S) Acquisition, construction and other 3 related costs for the Philadelphia 4 Polytechnic Charter High School 10,000,000 5 (T) Construction and other related costs 6 for the development of a skate park at 7 Paine Park 2,750,000 8 (U) Construction and other related costs 9 for improvements to the Friends Housing 10 Cooperative Foundation facilities 250,000 11 (V) Acquisition, construction, 12 infrastructure and other related costs 13 for Chester Avenue revitalization 1,000,000 14 (W) Acquisition, construction, 15 infrastructure and other related costs 16 to revitalize the Market Street 17 Corridor, including adjacent areas 30,000,000 18 (X) Construction, infrastructure and other 19 related costs for the Children's Zoo 8,200,000 20 (Y) Construction, infrastructure and other 21 related costs for the McNeil Aviary 6,000,000 22 (Z) Construction, infrastructure and other 23 related costs for the Philadelphia Zoo 24 Big Cat exhibit 5,800,000 25 (AA) Construction and other related costs 26 for the Washington Square 27 redevelopment 1,000,000 28 (BB) Construction of new facilities for 29 the Wellness Community's National 30 Survivorship Research and Training 20070H1589B3496 - 208 -
1 Institute 5,000,000 2 (CC) For existing building, gallery, 3 exhibit construction and renovations 4 including climate control, electric 5 upgrades, technology upgrades and 6 infrastructure 15,000,000 7 (DD) For construction of new building for 8 the Franklin Institute 15,000,000 9 (EE) Rehabilitation and expansion of the 10 Main Service Center at the Children's 11 Crisis Treatment Center, including 12 construction 4,000,000 13 (FF) Acquisition, construction, 14 infrastructure and other costs related 15 to the expansion of the Fox Chase 16 Recreational Center 1,200,000 17 (GG) CONSTRUCTION OF COMMUNITY ACTIVITY <-- 18 CENTER AT LASALLE COLLEGE HIGH SCHOOL 2,000,000 19 (HH) CONSTRUCTION OF AN EDUCATIONAL 20 CONFERENCE CENTER AT THE CRANALEITH 21 SPIRITUAL CENTER 1,000,000 <-- 22 SPIRITUAL CENTER 1,400,000 <-- 23 (II) EXPANSION OF THE CRISIS CENTER AT 24 COVENANT HOUSE PENNSYLVANIA 2,000,000 25 (JJ) DEMOLITION, INFRASTRUCTURE 26 IMPROVEMENTS, RENOVATIONS AND 27 CONSTRUCTION FOR UNIVERSITY OF 28 PENNSYLVANIA LAW SCHOOL BUILDING 1,000,000 29 (KK) DESIGN, ENGINEERING AND CONSTRUCTION 30 OF A PEDESTRIAN OVERPASS AT THE 20070H1589B3496 - 209 -
1 INTERSECTION OF SCHUYLKILL RIVER PARK 2 AND LOCUST STREET 2,000,000 3 (LL) ACQUISITION AND CONSTRUCTION OF ST. 4 RITA'S CONFERENCE CENTER 1,000,000 5 (MM) CONSTRUCTION OF FAIRMOUNT PARK 6 AUDUBON CENTER AT STRAWBERRY MANSION 2,500,000 7 (NN) INFRASTRUCTURE IMPROVEMENTS, 8 RENOVATIONS AND CONSTRUCTION OF THE 9 ATWATER KENT MUSEUM 1,000,000 10 (OO) INFRASTRUCTURE IMPROVEMENTS AND 11 CONSTRUCTION OF THE HERITAGE CENTER AT 12 THE UNION LEAGUE BUILDING 2,000,000 13 (PP) DEVELOPMENT AND CONSTRUCTION OF THE 14 MILL CREEK COMMUNITY CENTER 8,000,000 15 (QQ) INFRASTRUCTURE IMPROVEMENTS, 16 RENOVATIONS AND CONSTRUCTION FOR THE 17 MERCY FAMILY CENTER 500,000 18 (RR) RENOVATIONS AND CONSTRUCTION OF THE 19 MULTIUSE ATHLETIC FACILITY AT CARDINAL 20 DOUGHERTY HIGH SCHOOL 1,000,000 21 (SS) RENOVATIONS TO THE SULTAN JIHAD AHMAD 22 COMMUNITY CENTER 2,300,000 23 (TT) ACQUISITION, INFRASTRUCTURE 24 IMPROVEMENTS, RENOVATIONS AND 25 CONSTRUCTION FOR THE STEELE HEDDLE 26 BUILDING DEVELOPMENT PROJECT 5,000,000 27 (UU) RENOVATIONS TO THE LOUISE BROOKINS 28 HUMAN SERVICES BUILDING 500,000 29 (VV) RENOVATIONS AND CONSTRUCTION OF THE 30 PENROSE RECREATION CENTER 500,000 20070H1589B3496 - 210 -
1 (WW) DEMOLITION, INFRASTRUCTURE 2 IMPROVEMENTS AND CONSTRUCTION FOR THE 3 UPTOWN ENTERTAINMENT CENTER 500,000 4 (XX) DEMOLITION, ACQUISITION, 5 INFRASTRUCTURE IMPROVEMENTS AND 6 CONSTRUCTION OF THE APM WELLNESS CENTER 7 AND HEADQUARTERS 4,000,000 8 (YY) CONSTRUCTION OF THE HAVEN PENIEL 9 SENIOR CITIZENS RESIDENCE 400,000 10 (ZZ) DEMOLITION AND CONSTRUCTION OF THE 11 MEN AND WOMEN FOR HUMAN EXCELLENCE 12 FACILITY 250,000 13 (AAA) EXPANSION OF NORTHEAST PHILADELPHIA 14 REGIONAL CENTER OF THE COMMUNITY 15 COLLEGE OF PHILADELPHIA 10,100,000 16 (BBB) CONSTRUCTION OF LUTHERAN ARCHIVES 17 CENTER 1,000,000 18 (CCC) ACQUISITION, INFRASTRUCTURE 19 IMPROVEMENTS, CONSTRUCTION AND RELATED 20 COSTS FOR EXPANSION OF SAINT JOSEPH'S 21 UNIVERSITY CAMPION STUDENT CENTER 5,950,000 22 (DDD) ACQUISITION, INFRASTRUCTURE 23 IMPROVEMENTS, CONSTRUCTION AND RELATED 24 COSTS FOR RENOVATIONS TO SAINT JOSEPH'S 25 UNIVERSITY FACILITIES AT 5920 CITY 26 AVENUE 2,500,000 27 (EEE) RENOVATIONS, CONSTRUCTION AND 28 INFRASTRUCTURE REPAIR AND 29 REVITALIZATION OF WEST MARKET STREET 20,000,000 30 (FFF) RENOVATIONS AND CONSTRUCTION OF THE 20070H1589B3496 - 211 -
1 HADDINGTON/SHEPARD RECREATION COMPLEX 2,000,000 2 (GGG) RENOVATIONS AND CONSTRUCTION OF THE 3 PAPA COMMUNITY RECREATION CENTER 5,000,000 4 (HHH) DEMOLITION, RENOVATION AND 5 CONSTRUCTION OF MANTUA HALL 7,000,000 6 (III) RENOVATION AND CONSTRUCTION FOR THE 7 MILL CREEK REVITALIZATION PROJECT, TO 8 INCLUDE HOUSING, RECREATION AND 9 ECONOMIC DEVELOPMENT 10,000,000 10 (JJJ) DEMOLITION, RENOVATION AND 11 CONSTRUCTION OF THE CROYDON APARTMENT 12 COMPLEX FOR HOUSING, COMMERCIAL 13 DEVELOPMENT, RECREATION AND EDUCATION 14 FACILITIES 3,000,000 15 (KKK) RENOVATION AND CONSTRUCTION OF A 16 COMMUNITY CENTER AS PART OF THE BEAVER 17 WYNNFIELD ALTERNATIVE PROGRAM 3,000,000 18 (LLL) RENOVATION AND CONSTRUCTION OF THE 19 CHALMERS ATHLETIC AND RECREATION 20 COMPLEX 10,000,000 21 (MMM) RENOVATION OF THE LINCOLN/MARKET 22 SQUARE EDUCATION CENTER AND OFFICE 23 COMPLEX 10,000,000 24 (NNN) CONSTRUCTION OF ENTERPRISE HEIGHTS 25 FOR A RETAIL, COMMUNITY SPACE AND 26 HOUSING COMPLEX 2,500,000 27 (OOO) RENOVATION OF MANTUA HAVERFORD 28 COMMUNITY CENTER 2,000,000 29 (PPP) RENOVATIONS TO THE CENTER FOR HUMAN 30 ADVANCEMENT FOR EDUCATION CENTER, 20070H1589B3496 - 212 -
1 OFFICE COMPLEX AND COMMUNITY SPACE 5,000,000 2 (QQQ) RENOVATION AND CONSTRUCTION OF THE 3 FAMILY REVITALIZATION COMPLEX 150,000,000 4 (RRR) RENOVATION AND EXPANSION OF THE 5 KEYSTONE HOSPICE 10,000,000 6 (SSS) DEMOLITION, RENOVATION AND 7 CONSTRUCTION OF FREEDOM PARK COMPLEX 10,000,000 8 (TTT) RENOVATIONS, INFRASTRUCTURE 9 IMPROVEMENTS AND CONSTRUCTION OF THE 10 HISTORICAL SOCIETY OF PENNSYLVANIA 11 BUILDING 2,500,000 12 (UUU) RENOVATION AND CONSTRUCTION OF 13 ANIMAL SHELTER 2,000,000 14 (VVV) RENOVATION AND CONSTRUCTION OF A 15 CHILDREN AND FAMILY HEALTH CARE COMPLEX 16 IN WEST PHILADELPHIA 3,000,000 17 (WWW) RENOVATION AND CONSTRUCTION OF THE 18 WEST PHILADELPHIA TECHNOLOGY TRAINING 19 CENTER 2,500,000 20 (XXX) ACQUISITION, DEMOLITION, RENOVATION 21 AND CONSTRUCTION FOR THOMAS JEFFERSON 22 UNIVERSITY SPECIAL DIAGNOSTIC AND 23 TREATMENT MEDICAL AND SURGICAL 24 FACILITIES 50,000,000 25 (YYY) DEMOLITION AND ABATEMENT COSTS FOR 26 THE PASCHALL HOMES REDEVELOPMENT 27 PROJECT 8,600,000 28 (ZZZ) ACQUISITION, CONSTRUCTION, 29 INFRASTRUCTURE, REDEVELOPMENT AND OTHER 30 COSTS RELATED TO THE PLAZA AT 20070H1589B3496 - 213 -
1 ENTERPRISE HEIGHTS 7,000,000 2 (AAAA) ACQUISITION, CONSTRUCTION, 3 INFRASTRUCTURE, ABATEMENT OF HAZARDOUS 4 MATERIALS AND OTHER COSTS RELATED TO 5 THE NORTHWEST PHILLY ARTS AND CULTURE 6 CENTER 10,000,000 7 (BBBB) CONSTRUCTION, INFRASTRUCTURE AND <-- 8 OTHER COSTS RELATED TO THE STEVENSON 9 LANE RESIDENCE PROJECT 2,000,000 10 (CCCC) CONSTRUCTION, INFRASTRUCTURE, <-- 11 REDEVELOPMENT AND OTHER COSTS RELATED 12 TO THE HOLY FAMILY UNIVERSITY SCHOOL OF <-- 13 BUSINESS ADMINISTRATION 2,000,000 14 UNIVERSITY CAMPUS IMPROVEMENTS 6,000,000 <-- 15 (DDDD) CONSTRUCTION, REDEVELOPMENT AND <-- 16 OTHER COSTS RELATED TO THE PHILADELPHIA <-- 17 UNIVERSITY PEDESTRIAN BRIDGE/TRAFFIC <-- 18 SAFETY PROJECT 2,000,000 19 CAMPUS IMPROVEMENTS 2,000,000 <-- 20 (EEEE) CONSTRUCTION AND OTHER COSTS 21 RELATED TO THE NORTHEAST FAMILY YMCA 3,500,000 22 (FFFF) CONSTRUCTION, INFRASTRUCTURE, 23 REDEVELOPMENT, ABATEMENT OF HAZARDOUS 24 MATERIALS AND OTHER COSTS RELATED TO 25 THE INDEPENDENCE CHARTER SCHOOL 8,600,000 26 (GGGG) CONSTRUCTION, REDEVELOPMENT AND 27 OTHER COSTS RELATED TO THE ITALIAN 28 AMERICAN CULTURAL CENTER 2,000,000 29 (HHHH) CONSTRUCTION RELATED TO WEST 30 PARKSIDE BUILDING ECONOMIC AND 20070H1589B3496 - 214 -
1 COMMERCIAL DEVELOPMENT PROJECT 500,000 2 (IIII) INFRASTRUCTURE IMPROVEMENTS AND 3 CONSTRUCTION FOR THE NAZARETH HOSPITAL 4 ONCOLOGY PROJECT 1,000,000 5 (JJJJ) HAHNEMANN HOSPITAL, INFRASTRUCTURE 6 IMPROVEMENTS, CONSTRUCTION AND OTHER 7 RELATED COSTS FOR THE EXPANSION OF THE 8 INTENSIVE CARE UNIT 4,500,000 9 (KKKK) HAHNEMANN HOSPITAL, INFRASTRUCTURE 10 IMPROVEMENTS, CONSTRUCTION AND OTHER 11 RELATED COSTS FOR MODERNIZATION AND 12 EXPANSION OF THE OPERATING ROOMS AND 13 RECOVERY ROOM 10,000,000 14 (LLLL) DEMOLITION, INFRASTRUCTURE 15 IMPROVEMENTS, CONSTRUCTION AND OTHER 16 COSTS RELATED TO THE CONVOCATION AND 17 BASKETBALL ARENA PROJECT AT DREXEL 18 UNIVERSITY 15,000,000 <-- 19 UNIVERSITY 25,000,000 <-- 20 (MMMM) INFRASTRUCTURE IMPROVEMENTS AND 21 DEVELOPMENT RELATED TO THE UNIVERSITY 22 CITY GATEWAY PROJECT 30,000,000 23 (NNNN) RENOVATION AND CONSTRUCTION OF THE 24 HADDINGTON HEALTH CENTER 1,000,000 <-- 25 HADDINGTON HEALTH CENTER 2,000,000 <-- 26 (OOOO) INFRASTRUCTURE IMPROVEMENTS FOR THE 27 FORMER LIDDONFIELD HOMES AT TORRESDALE 28 AVENUE AND JACKSON PLACE 10,000,000 29 (PPPP) CONSTRUCTION AND OTHER RELATED 30 COSTS FOR THE OCTAVIUS V. CATTO 20070H1589B3496 - 215 -
1 MEMORIAL PROJECT 1,000,000 2 (QQQQ) CONSTRUCTION, INFRASTRUCTURE <-- 3 IMPROVEMENTS AND OTHER COSTS RELATED TO 4 THE EXPANSION OF THE CHILDREN'S 5 HOSPITAL OF PHILADELPHIA ON THE SITE OF 6 THE FORMER PHILADELPHIA CIVIC CENTER 30,000,000 7 (RRRR) INDEPENDENCE NATIONAL HISTORIC 8 PARK, INSTALLATION OF BELOW-GROUND 9 PROJECTION AND ELECTRONIC EQUIPMENT TO 10 OPERATE DRAMATIZATION OF EVENTS LEADING 11 TO THE DECLARATION OF INDEPENDENCE FOR 12 THE LIGHTS OF LIBERTY 3,300,000 13 (SSSS) ACQUISITION, INFRASTRUCTURE 14 IMPROVEMENTS AND CONSTRUCTION FOR THE 15 TALLER PUERTORRIQUENO, INC. EXPANSION 16 PROJECT 5,000,000 17 (TTTT) DISABILITY JOB TRAINING AND 18 RESIDENTIAL PROJECT. ACQUISITION, 19 INFRASTRUCTURE IMPROVEMENTS, 20 CONSTRUCTION AND OTHER COSTS RELATED TO 21 A REHABILITATION FACILITY AT 8TH AND 22 LEHIGH STREETS 6,000,000 23 (UUUU) INFRASTRUCTURE IMPROVEMENTS, 24 CONSTRUCTION AND OTHER COSTS RELATED TO 25 THE AQUATIC CENTER PROJECT FOR THE 26 OVERBROOK SCHOOL FOR THE BLIND 3,000,000 27 (VVVV) DEMOLITION, RENOVATIONS, ABATEMENT 28 AND OTHER COSTS RELATED TO THE 29 FRANKFORD ARSENAL REMEDIATION AND 30 REVITALIZATION PROJECT 2,500,000 20070H1589B3496 - 216 -
1 (WWWW) CONSTRUCTION, REDEVELOPMENT AND 2 OTHER COSTS RELATED TO THE ENERGY 3 COORDINATING AGENCY TRAINING CENTER 853,000 4 (XXXX) INFRASTRUCTURE IMPROVEMENTS AND 5 CONSTRUCTION FOR ALLENS LANE ART 6 CENTER 250,000 7 (YYYY) CONSTRUCTION AND OTHER COSTS 8 RELATED TO THE LOWER GERMANTOWN MEDICAL 9 CENTER PROJECT 500,000 10 (ZZZZ) INFRASTRUCTURE IMPROVEMENTS AND 11 CONSTRUCTION OF THE GERMANTOWN 12 REVITALIZATION PROJECT 500,000 13 (AAAAA) INFRASTRUCTURE IMPROVEMENTS FOR 14 ELMWOOD PARK 500,000 15 (BBBBB) CONSTRUCTION FOR INGLIS HOUSE 250,000 16 (CCCCC) RENOVATIONS AND EXPANSION OF 17 CHRISTIAN STREET YMCA 500,000 18 (DDDDD) REDEVELOPMENT AND CONSTRUCTION FOR 19 KINGSESSING HEIGHTS CDC REVITALIZATION 20 PLAN 750,000 21 (EEEEE) ACQUISITION AND IMPROVEMENTS FOR 22 INTERCULTURAL FAMILY SERVICES, INC. 250,000 23 (FFFFF) RENOVATIONS OF BUILDING FOR THE 24 BOYS LATIN OF PHILADELPHIA CHARTER 25 SCHOOL 300,000 26 (GGGGG) BUILDING RENOVATIONS FOR THE 27 AFRICAN AMERICAN MUSEUM 250,000 28 (HHHHH) RENOVATION OF STOREFRONT PROPERTY 29 FOR THE ART SANCTUARY 500,000 30 (IIIII) RENOVATIONS TO RACS BUILDING 500,000 20070H1589B3496 - 217 -
1 (JJJJJ) RENOVATIONS FOR THE BELMONT 2 COMMUNITY BUILDING 1,250,000 3 (KKKKK) CONSTRUCTION AND INFRASTRUCTURE 4 FOR THE GRAYS FERRY MEMORIAL PARK AT 5 29TH AND TASKER STREETS 500,000 6 (LLLLL) INFRASTRUCTURE IMPROVEMENTS, 7 CONSTRUCTION AND OTHER COSTS RELATED TO 8 THE LISC MULTI-PARTNER WEST 9 PHILADELPHIA INITIATIVE 4,000,000 10 (MMMMM) ACQUISITION, CONSTRUCTION, 11 INFRASTRUCTURE AND OTHER RELATED COSTS 12 TO REVITALIZE OGONTZ AVENUE CORRIDOR 5,000,000 13 (NNNNN) INFRASTRUCTURE IMPROVEMENTS, 14 CONSTRUCTION AND OTHER RELATED COSTS 15 FOR A HOTEL FACILITY 5,000,000 16 (OOOOO) CONSTRUCTION OF EMERGENCY 17 DEPARTMENT, INCLUDING THE EXPANSION OF 18 EXISTING MEDICAL AND SURGICAL 19 OUTPATIENT FACILITIES TO SAINT 20 CHRISTOPHER'S CHILDREN'S HOSPITAL 10,000,000 21 (PPPPP) CONSTRUCTION, INFRASTRUCTURE 22 IMPROVEMENTS AND OTHER COSTS RELATED TO 23 THE DILWORTH PLAZA PROJECT 20,000,000 24 (QQQQQ) ACQUISITION, CONSTRUCTION AND 25 OTHER COSTS RELATED TO THE 26 REDEVELOPMENT OF THE JOHN WANAMAKER 27 SCHOOL SITE 6,000,000 28 (RRRRR) ACQUISITION, CONSTRUCTION, <-- 29 INFRASTRUCTURE AND OTHER RELATED COSTS 30 TO REVITALIZE THE CORRIDOR FROM GREENE 20070H1589B3496 - 218 -
1 STREET AND PULASKI AVENUE TO GREENE 2 STREET AND BERKLEY STREET, INCLUDING 3 ADJACENT AREAS 30,000,000 4 (SSSSS) ACQUISITION, CONSTRUCTION, 5 INFRASTRUCTURE AND OTHER RELATED COSTS 6 TO REVITALIZE THE CORRIDOR FROM WAYNE 7 AVENUE AND LINCOLN DRIVE TO WAYNE 8 AVENUE AND BERKLEY STREET, INCLUDING 9 ADJACENT AREAS 30,000,000 10 (TTTTT) ACQUISITION, CONSTRUCTION, 11 INFRASTRUCTURE AND OTHER RELATED COSTS 12 TO REVITALIZE THE CORRIDOR FROM 13 GERMANTOWN AVENUE AND WILLOW GROVE 14 AVENUE TO GERMANTOWN AVENUE AND CECIL 15 B. MOORE AVENUE, INCLUDING ADJACENT 16 AREAS 30,000,000 17 (UUUUU) ACQUISITION, CONSTRUCTION, 18 INFRASTRUCTURE AND OTHER RELATED COSTS 19 TO REVITALIZE THE CORRIDOR FROM CHELTEN 20 AVENUE AND WISTER STREET TO PULASKI 21 AVENUE AND CHELTEN AVENUE, INCLUDING 22 ADJACENT AREAS 30,000,000 23 (VVVVV) ACQUISITION, CONSTRUCTION, 24 INFRASTRUCTURE AND OTHER RELATED COSTS 25 TO REVITALIZE THE CORRIDOR FROM BROAD 26 STREET AND OLNEY AVENUE TO CHEW AVENUE 27 AND MT. PLEASANT AVENUE, INCLUDING 28 ADJACENT AREAS 30,000,000 29 (WWWWW) ACQUISITION, CONSTRUCTION, 30 INFRASTRUCTURE AND OTHER RELATED COSTS 20070H1589B3496 - 219 -
1 TO REVITALIZE THE CORRIDOR FROM 2 WADSWORTH AVENUE TO 18TH STREET AND 3 CHELTENHAM AVENUE, INCLUDING ADJACENT 4 AREAS 30,000,000 5 (XXXXX) ACQUISITION, CONSTRUCTION, 6 INFRASTRUCTURE AND OTHER RELATED COSTS 7 TO REVITALIZE THE CORRIDOR FROM STENTON 8 AVENUE AND OGONTZ AVENUE TO STENTON 9 AVENUE AND MT. PLEASANT AVENUE, 10 INCLUDING ADJACENT AREAS 30,000,000 11 (YYYYY) ACQUISITION, CONSTRUCTION, 12 INFRASTRUCTURE AND OTHER RELATED COSTS 13 TO REVITALIZE THE CORRIDOR FROM BROAD 14 STREET AND CHELTENHAM AVENUE TO BROAD 15 STREET AND VINE STREET, INCLUDING 16 ADJACENT AREAS 30,000,000 17 (ZZZZZ) ACQUISITION, CONSTRUCTION, 18 INFRASTRUCTURE AND OTHER RELATED COSTS 19 TO REVITALIZE THE CORRIDOR FROM 80TH 20 AVENUE AND OGONTZ AVENUE TO 65TH AVENUE 21 AND OGONTZ AVENUE, INCLUDING ADJACENT 22 AREAS 30,000,000 23 (A6) ACQUISITION, CONSTRUCTION, 24 INFRASTRUCTURE AND OTHER RELATED COSTS 25 TO REVITALIZE THE CORRIDOR FROM 26 CHELTENHAM AVENUE TO OGONTZ AVENUE, 27 INCLUDING ADJACENT AREAS 30,000,000 28 (B6) CONSTRUCTION, REDEVELOPMENT AND OTHER 29 RELATED COSTS FOR THE PEOPLE'S 30 EMERGENCY CENTER REHABILITATION 20070H1589B3496 - 220 -
1 PROJECT 1,500,000 2 (C6) ACQUISITION, CONSTRUCTION, 3 INFRASTRUCTURE AND OTHER COSTS RELATED 4 TO THE ACADEMY OF VOCAL ARTS EXPANSION 5 PROJECT 1,250,000 6 (D6) ACQUISITION, CONSTRUCTION, 7 INFRASTRUCTURE, REDEVELOPMENT AND OTHER 8 COSTS RELATED TO THE EINSTEIN EMERGENCY 9 DEPARTMENT EXPANSION 8,000,000 10 (E6) ACQUISITION, CONSTRUCTION, 11 INFRASTRUCTURE AND OTHER COSTS RELATED 12 TO THE CENTER FOR AUTISM EXPANSION 13 PROJECT 7,600,000 14 (F6) ACQUISITION, CONSTRUCTION, 15 INFRASTRUCTURE, REDEVELOPMENT AND OTHER 16 COSTS RELATED TO THE CHELTENHAM AND 17 OGONTZ AVENUES REDEVELOPMENT PROJECT 10,000,000 18 (G6) CONSTRUCTION, INFRASTRUCTURE AND 19 OTHER RELATED COSTS FOR RENOVATIONS TO 20 THE AFRICAN AMERICAN MUSEUM 250,000 21 (H6) CONSTRUCTION, REDEVELOPMENT AND OTHER 22 COSTS RELATED TO THE AVENUE OF THE ARTS 23 PROJECT 25,000,000 24 (I6) CONSTRUCTION, REDEVELOPMENT AND OTHER 25 RELATED COSTS FOR THE ACADEMY OF 26 NATURAL SCIENCES 24,000,000 27 (J6) CONSTRUCTION, ACQUISITION, 28 REDEVELOPMENT AND OTHER RELATED COSTS 29 FOR THE UPTOWN THEATER 3,000,000 30 (K6) CONSTRUCTION, REDEVELOPMENT AND OTHER 20070H1589B3496 - 221 -
1 RELATED COSTS FOR THE PHILADELPHIA 2 CENTER FOR ART AND TECHNOLOGY 1,000,000 3 (L6) CONSTRUCTION, ACQUISITION AND OTHER 4 RELATED COSTS FOR THE ACADEMY IN 5 MANAYUNK INSTITUTE FOR LEARNING AND 6 RESEARCH 5,000,000 7 (M6) CONSTRUCTION, INFRASTRUCTURE AND 8 OTHER RELATED COSTS FOR CONGRESO'S 9 EDUCATION AND YOUTH BUILDING 4,000,000 10 (N6) DESIGN, CONSTRUCTION, RENOVATION AND 11 EXPANSION OF EMERGENCY ROOM, INCLUDING 12 NEW PATIENT ROOMS AT MERCY PHILADELPHIA 13 HOSPITAL 4,350,000 14 (O6) IMPROVEMENTS TO GEORGE WASHINGTON 15 HIGH SCHOOL TRACK AND RELATED 16 FACILITIES, INCLUDING NECESSARY COSTS 2,100,000 17 (P6) INFRASTRUCTURE IMPROVEMENTS, 18 RENOVATIONS AND CONSTRUCTION FOR THE 19 JUNIATA GOLF RESTORATION PROJECT 500,000 20 (Q6) ACQUISITION, INFRASTRUCTURE 21 IMPROVEMENTS AND CONSTRUCTION FOR THE 22 EMPOWERMENT VILLAGE PROJECT 2,000,000 23 (R6) RENOVATIONS AND CONSTRUCTION FOR THE 24 VISITING NURSE ASSOCIATION BUILDING 900,000 25 (S6) RENOVATIONS AND REHABILITATION FOR 26 THE PEOPLES EMERGENCY CENTER 3,000,000 27 (T6) RENOVATIONS AND EXPANSION OF THE 28 NORTHEASTERN HOSPITAL OBSTETRIC SUITE 29 FOR TEMPLE HEALTH 2,500,000 30 (U6) RENOVATIONS AND CONSTRUCTION OF THE 20070H1589B3496 - 222 -
1 BOYER PAVILION AT TEMPLE UNIVERSITY 2 HOSPITAL 7,500,000 3 (V6) CONSTRUCTION AND RELATED COSTS FOR 4 THE GLOBE DYE WORKS DEVELOPMENT 5 PROJECT 2,000,000 6 (W6) RENOVATIONS OF THE DEVON THEATER OF 7 PERFORMING ARTS INTO AN ARTS CENTER AND 8 RETAIL STORES 1,000,000 9 (X6) INFRASTRUCTURE IMPROVEMENTS, 10 CONSTRUCTION AND OTHER RELATED COSTS 11 FOR THE URBAN YOUTH BASEBALL ACADEMY 3,000,000 12 (Y6) ACQUISITION, RENOVATIONS, 13 CONSTRUCTION AND OTHER RELATED COSTS 14 FOR THE ACADEMY OF VOCAL ARTS 1,250,000 15 (Z6) CONSTRUCTION, INFRASTRUCTURE 16 IMPROVEMENTS AND OTHER RELATED COSTS TO 17 THE ACADEMY OF NATURAL SCIENCES 24,000,000 18 (A7) ACQUISITION, INFRASTRUCTURE 19 IMPROVEMENTS, CONSTRUCTION AND OTHER 20 COSTS RELATED TO THE KENSINGTON AND 21 ALLEGHENY COMMERCIAL CORRIDOR PROJECT 2,500,000 22 (B7) CONSTRUCTION AND INFRASTRUCTURE 23 IMPROVEMENTS FOR THE FRANKLIN TOWNE 24 CHARTER HIGH SCHOOL EXPANSION PROJECT 3,500,000 25 (C7) CONSTRUCTION AND INFRASTRUCTURE 26 IMPROVEMENTS FOR THE TEMPLE UNIVERSITY 27 RESTORATION PROJECT 14,500,000 28 (D7) CONSTRUCTION, INFRASTRUCTURE 29 IMPROVEMENTS AND OTHER COSTS RELATED TO 30 THE FREE LIBRARY OF PHILADELPHIA 20070H1589B3496 - 223 -
1 RESTORATION PROJECT 30,000,000
2 (E7) CONSTRUCTION, INFRASTRUCTURE
3 IMPROVEMENTS AND OTHER COSTS RELATED TO
4 THE AVENUE OF THE ARTS NORTH BROAD
5 STREETSCAPE PROJECT 20,000,000
6 (F7) CONSTRUCTION, INFRASTRUCTURE
7 IMPROVEMENTS AND OTHER COSTS RELATED TO
8 THE PRESIDENT'S HOUSE PROJECT 3,500,000
9 (G7) CONSTRUCTION, INFRASTRUCTURE
10 IMPROVEMENTS AND OTHER COSTS RELATED TO
11 THE ROBIN HOOD DELL EAST PROJECT 2,500,000
12 (H7) CONSTRUCTION, INFRASTRUCTURE
13 IMPROVEMENTS AND OTHER COSTS RELATED TO
14 THE COMMUNITY PERFORMING ARTS CENTER AT
15 VENICE ISLAND PROJECT 1,000,000
16 (I7) CONSTRUCTION AND OTHER RELATED COSTS
17 FOR THE SWAT BOMB TACTICAL FACILITY
18 PROJECT 3,375,000
19 (J7) CONSTRUCTION AND OTHER RELATED COSTS
20 FOR THE YOUTH STUDY CENTER 9,625,000
21 (52) Pike County
22 (i) County projects (Reserved) <--
23 (I) COUNTY PROJECTS <--
24 (A) ACQUISITION, INFRASTRUCTURE,
25 REHABILITATION, CONSTRUCTION AND OTHER
26 RELATED COSTS FOR IMPROVEMENTS TO THE
27 MT. LAUREL CENTER FOR PERFORMING ARTS 600,000
28 (B) ACQUISITION, SITE DEVELOPMENT,
29 INFRASTRUCTURE AND OTHER RELATED COSTS
30 FOR THE CONSTRUCTION OF AN EXPANSION OF
20070H1589B3496 - 224 -
1 THE PIKE COUNTY ADMINISTRATIVE 2 FACILITY 5,000,000 3 (C) ACQUISITION, INFRASTRUCTURE, SITE 4 DEVELOPMENT, CONSTRUCTION AND OTHER 5 RELATED COSTS FOR THE DEVELOPMENT OF AN 6 EMERGENCY TRAINING CENTER 5,000,000 7 (D) ACQUISITION, SITE DEVELOPMENT, 8 INFRASTRUCTURE AND CONSTRUCTION OF A 9 JUVENILE DETENTION CENTER AND YOUTH 10 SHELTER 5,000,000 11 (I.1) BLOOMING GROVE TOWNSHIP <-- 12 (A) CONSTRUCTION OF AN EMERGENCY SERVICES 13 TRAINING COMPLEX/911 CENTER FOR 14 FIRE/RESCUE, EMS AND LAW ENFORCEMENT 15 PERSONNEL, INCLUDING TRAINING TOWER, 16 OBSERVATION COMMAND CENTER AND 17 INSTRUCTIONAL BUILDING 3,826,000 18 (ii) Lehman Township <-- 19 (A) Redevelopment and other costs related 20 to the completion and capital 21 improvements to Mountain Laurel Center 22 for the Performing Arts 600,000 23 (53) Potter County (Reserved) <-- 24 (III) (II) MILFORD BOROUGH <-- 25 (A) INFRASTRUCTURE AND CONSTRUCTION OF A 26 PUBLIC LIBRARY 1,000,000 27 (II.1) PALMYRA TOWNSHIP <-- 28 (A) ACQUISITION, INFRASTRUCTURE, 29 CONSTRUCTION AND OTHER RELATED COSTS 30 FOR THE CONSTRUCTION OF A 10,000 20070H1589B3496 - 225 -
1 SQUARE-FOOT VISITORS CENTER ON ROUTE 6
2 ADJACENT TO PALMYRA TOWNSHIP BEACH 2,000,000
3 (IV) (III) PIKE COUNTY INDUSTRIAL DEVELOPMENT <--
4 CORPORATION
5 (A) ACQUISITION, INFRASTRUCTURE, SITE
6 DEVELOPMENT, CONSTRUCTION AND OTHER
7 RELATED COSTS FOR THE DEVELOPMENT OF
8 THE PIKE COUNTY BUSINESS PARK 2,500,000
9 (53) POTTER COUNTY
10 (I) COUNTY PROJECTS (RESERVED)
11 (II) COUDERSPORT BOROUGH
12 (A) CONSTRUCTION, RENOVATION AND
13 REHABILITATION NECESSARY FOR A
14 COMPREHENSIVE UPGRADE OF THE FACILITY
15 AND PHYSICAL PLANT, INCLUDING EXPANSION
16 OF THE EMERGENCY DEPARTMENT,
17 INFRASTRUCTURE IMPROVEMENTS AND
18 PHYSICAL REDESIGN OF THE LONG-TERM CARE
19 FACILITY, FIRE SAFETY PROTECTION
20 IMPROVEMENTS AND UPGRADES AND
21 RENOVATION OF THE DIETARY SERVICE
22 DEPARTMENT AT CHARLES COLE MEMORIAL
23 HOSPITAL 2,000,000
24 (III) POTTER COUNTY REDEVELOPMENT AUTHORITY
25 (A) ACQUISITION, INFRASTRUCTURE,
26 CONSTRUCTION AND OTHER RELATED COSTS
27 FOR THE REVITALIZATION AND
28 REHABILITATION OF DOWNTOWN GALETON,
29 INCLUDING FACADE IMPROVEMENTS, SITE
30 DEVELOPMENT AND FACILITY CONSTRUCTION 1,000,000
20070H1589B3496 - 226 -
1 (B) INFRASTRUCTURE, CONSTRUCTION AND OTHER 2 RELATED COSTS FOR THE DEVELOPMENT OF AN 3 INDUSTRIAL PARK IN THE BOROUGH OF 4 COUDERSPORT, INCLUDING SITE 5 PREPARATION, CONSTRUCTION AND ON-SITE 6 INFRASTRUCTURE DEVELOPMENT 1,000,000 7 (C) ACQUISITION, INFRASTRUCTURE, 8 CONSTRUCTION AND OTHER RELATED COSTS 9 FOR THE DEVELOPMENT OF A HELICOPTER 10 LANDING AND MAINTENANCE FACILITY FOR 11 ECONOMIC DEVELOPMENT PURPOSES RELATED 12 TO ATTRACTING CORPORATE TENANTS TO 13 POTTER COUNTY 1,000,000 14 (54) Schuylkill County 15 (i) County projects 16 (A) Acquisition, infrastructure and other 17 costs related to the construction of a 18 regional industrial park 1,000,000 19 (B) LAND ACQUISITION, INFRASTRUCTURE <-- 20 IMPROVEMENTS AND CONSTRUCTION NECESSARY 21 TO MAINTAIN THE COMPETITIVE POSITION OF 22 AN EXISTING BUSINESS ENTITY OR FOR THE 23 DEVELOPMENT OF BUSINESS-READY SITES FOR 24 POTENTIAL BUSINESS TENANTS 10,000,000 25 (C) ACQUISITION, CONSTRUCTION, 26 INFRASTRUCTURE AND OTHER RELATED COSTS 27 FOR THE SCHUYLKILL WOMEN IN CRISIS 28 FACILITY 1,000,000 29 (D) ACQUISITION, INFRASTRUCTURE 30 IMPROVEMENTS AND CONSTRUCTION FOR THE 20070H1589B3496 - 227 -
1 AURORA INDUSTRIAL BUILDING PROJECT 800,000 2 (E) CONSTRUCTION, INFRASTRUCTURE AND OTHER <-- 3 RELATED COSTS TO RENOVATE THE 4 SCHUYLKILL COUNTY COURT HOUSE 500,000 5 (ii) Coaldale Borough 6 (A) Construction, infrastructure and other 7 costs related to the renovation of the 8 Coaldale Complex 1,000,000 9 (iii) Orwigsburg Borough 10 (A) Construction, infrastructure and other 11 costs related to the renovation of the 12 Orwigsburg Memorial Hall 500,000 13 (B) Construction, infrastructure and other 14 costs related to the renovation of the 15 Orwigsburg Public Library 500,000 16 (C) Construction, infrastructure and other 17 costs related to the renovation of 18 Orwigsburg Borough Hall 500,000 19 (iv) Tamaqua Borough 20 (A) Reconstruction of Wabash Creek storm 21 water tunnel and diversion system 5,000,000 22 (B) Repairs to the two Owl Creek dams, 23 including breast repairs and spillway 24 construction 3,000,000 25 (v) West Penn Township 26 (A) Acquisition, infrastructure and other 27 costs related to the construction of a 28 regional industrial park 1,000,000 29 (55) Snyder County 30 (i) County projects (Reserved) 20070H1589B3496 - 228 -
1 (ii) Selinsgrove Borough 2 (A) Construction of Susquehanna University 3 Science facility 15,000,000 4 (B) Renovation of Susquehanna University 5 Science Hall, including related 6 infrastructure 6,000,000 7 (56) Somerset County 8 (i) County projects (Reserved) <-- 9 (I) COUNTY PROJECTS (RESERVED) <-- 10 (I) COUNTY PROJECTS <-- 11 (A) ACQUISITION AND CONSTRUCTION OF AN 12 INPATIENT HOSPICE FACILITY BY SOMERSET 13 HOSPITAL, TO BE LOCATED IN SOMERSET 14 TOWNSHIP 500,000 15 (B) REDEVELOPMENT, CONSTRUCTION AND 16 RELATED INFRASTRUCTURE COSTS FOR LAUREL 17 HIGHLANDS BUSINESS PARK 5,000,000 18 (C) RENOVATIONS TO SOMERSET HOSPITAL, 19 INCLUDING UPGRADE OF PHARMACY 20 FACILITIES 1,500,000 21 (D) ACQUISITION, RENOVATION, DEMOLITION 22 AND CONSTRUCTION RELATED TO THE 23 DEVELOPMENT OF A DOWNTOWN HEALTH CARE 24 CAMPUS ASSOCIATED WITH SOMERSET 25 HOSPITAL 1,500,000 26 (II) FAIRHOPE TOWNSHIP 27 (A) SITE DEVELOPMENT, CONSTRUCTION, 28 REHABILITATION AND INFRASTRUCTURE 29 IMPROVEMENTS TO THE INTERNATIONAL 30 CONSERVATION CENTER 3,000,000 20070H1589B3496 - 229 -
1 (ii) (III) Jefferson Township <-- 2 (A) Site development, construction and 3 infrastructure improvements to property 4 located along Route 31 10,000,000 5 (iii) (IV) Somerset Township <-- 6 (A) Redevelopment, construction and 7 related infrastructure costs for Laurel 8 Highlands Business Park 5,000,000 9 (B) RENOVATIONS TO SOMERSET HOSPITAL, <-- 10 INCLUDING UPGRADE OF PHARMACY 11 FACILITIES 1,500,000 12 (C) ACQUISITION, RENOVATION, DEMOLITION 13 AND CONSTRUCTION RELATED TO THE 14 DEVELOPMENT OF A DOWNTOWN HEALTH CARE 15 CAMPUS ASSOCIATED WITH SOMERSET 16 HOSPITAL 1,500,000 17 (IV) WINDBER BOROUGH <-- 18 (A) CONSTRUCTION AND OTHER RELATED COSTS 19 FOR EXPANSION OF WINDBER MEDICAL CENTER 20 EMERGENCY DEPARTMENT 1,000,000 21 (57) Sullivan County (Reserved) 22 (58) Susquehanna County (Reserved) 23 (59) Tioga County 24 (i) County projects (Reserved) <-- 25 (I) COUNTY PROJECTS <-- 26 (A) DEVELOPMENT OF THE MARSH CREEK 27 GREENWAY, EXTENDING FROM THE BOROUGH OF 28 WELLSBORO TO THE PINE CREEK TRAIL AT 29 WELLSBORO JUNCTION 2,350,000 30 (B) CONSTRUCTION OF A NEW 911/EMERGENCY 20070H1589B3496 - 230 -
1 OPERATIONS CENTER/TRAINING FACILITY 3,500,000
2 (C) DEVELOPMENT OF THE MILL COVE
3 ENVIRONMENTAL EDUCATION CENTER,
4 INCLUDING INFRASTRUCTURE IMPROVEMENTS
5 AND CONSTRUCTION OF SUPPORT FACILITIES 1,500,000
6 (D) ACQUISITION, INFRASTRUCTURE,
7 CONSTRUCTION AND OTHER RELATED COSTS
8 FOR THE NATURE QUEST GEOTOURISM LODGE
9 AND BUSINESS FACILITIES DEVELOPMENT
10 PROJECT, INCLUDING THE DEVELOPMENT OF A
11 200-ROOM LODGE AND OPERATIONAL
12 FACILITIES LOCATED IN ANSONIA 12,500,000
13 (II) TIOGA COUNTY DEVELOPMENT CORPORATION
14 (A) DEVELOPMENT OF A GREEN DESIGN (LEED)
15 INDUSTRIAL PARK ALONG US 15 (FUTURE I-
16 99), INCLUDING INTERCHANGE ACCESSES TO
17 US 15 AS PART OF THE INTERSTATE 99
18 BUSINESS PARK, PHASE II 7,000,000
19 (B) RENOVATION AND REHABILITATION OF THE
20 TCDC HISTORIC BUILDING LOCATED IN THE
21 BOROUGH OF WELLSBORO, INCLUDING
22 HAZARDOUS MATERIAL ABATEMENT 750,000
23 (III) LIBERTY BOROUGH
24 (A) REPLACEMENT OF A STONE CULVERT THAT
25 PARALLELS SR 2007 THROUGH LIBERTY
26 BOROUGH AS PART OF THE WILLIAMSON TRAIL
27 PROJECT 500,000
28 (ii) (IV) Shippen Township <--
29 (A) Expansion and construction of Nature
30 Quest Geotourism Lodge, including
20070H1589B3496 - 231 -
1 acquisition and infrastructure 12,500,000 2 (iii) (V) Wellsboro Borough <-- 3 (A) Acquisition, construction and 4 infrastructure improvements of a 5 Community Performing Arts Center 7,500,000 6 (B) CONSTRUCTION OF THE DEANE CENTER FOR <-- 7 THE PERFORMING ARTS 7,500,000 8 (60) Union County 9 (i) County projects (Reserved) <-- 10 (I) COUNTY PROJECTS <-- 11 (A) DEVELOPMENT OF THE BUCKNELL UNIVERSITY 12 BULL RUN GATEWAY NEIGHBORHOOD 13 DEVELOPMENT PROJECT, INCLUDING AN ART 14 CENTER, PARKING FACILITIES, BOOKSTORE, 15 INN AND BUSINESS CENTER 20,000,000 16 (ii) Kelly Township 17 (A) Expansion and renovation of 18 Evangelical Community Hospital, 19 including related infrastructure 11,000,000 20 (61) Venango County 21 (i) County projects (Reserved) <-- 22 (I) COUNTY PROJECTS <-- 23 (A) RENOVATIONS AND REHABILITATION TO THE 24 VENANGO COUNTY COURTHOUSE 500,000 25 (B) INFRASTRUCTURE AND OTHER RELATED COSTS 26 FOR THE DEVELOPMENT OF THE FRENCHCREEK 27 INDUSTRIAL PARK, A MULTITENANT LIGHT 28 INDUSTRIAL PARK 700,000 29 (C) SITE DEVELOPMENT, INFRASTRUCTURE 30 IMPROVEMENTS AND CONSTRUCTION OF A 20070H1589B3496 - 232 -
1 BUILDING ON A DESIGNATED FOREIGN TRADE 2 ZONE ADJACENT TO THE VENANGO REGIONAL 3 AIRPORT 1,000,000 4 (D) ACQUISITION AND CONSTRUCTION OF A BIKE 5 TRAIL FROM MCCLINTOCK WELL NO. 1 FROM 6 CORNPLANTER TOWNSHIP TO THE CITY OF OIL 7 CITY 1,200,000 8 (ii) Emlenton Borough 9 (A) Acquisition, site development and 10 construction to support revitalization 11 in Emlenton Borough 500,000 12 (62) Warren County (Reserved) <-- 13 (III) CITY OF OIL CITY <-- 14 (A) RENOVATIONS, CONSTRUCTION AND 15 EXPANSION OF THE OIL CITY YMCA 1,500,000 16 (B) RENOVATIONS, NEW CONSTRUCTION AND 17 REHABILITATION OF THE CORNPLANTER 18 SQUARE BUILDING AND THE BRODY BLOCK 7,500,000 19 (62) WARREN COUNTY 20 (I) COUNTY PROJECTS (RESERVED) <-- 21 (I) COUNTY PROJECTS <-- 22 (A) INFRASTRUCTURE, SITE DEVELOPMENT, 23 REHABILITATION, CONSTRUCTION AND OTHER 24 COSTS RELATED TO THE EXPANSION OF THE 25 TELECOMMUNICATIONS INFRASTRUCTURE 26 WITHIN AND THROUGHOUT NORTHWEST 27 PENNSYLVANIA TO ALLOW FOR BUSINESS 28 RETENTION, EXPANSION AND RECRUITMENT 5,000,000 29 (II) PINE GROVE TOWNSHIP 30 (A) CONSTRUCTION OF 12 INDEPENDENT LIVING 20070H1589B3496 - 233 -
1 UNITS, INCLUDING SITE WORK AND 2 INFRASTRUCTURE IMPROVEMENTS AT WARREN 3 GENERAL HOSPITAL 1,025,000 4 (III) CITY OF WARREN 5 (A) ACQUISITION OF IMAGING EQUIPMENT, 6 ELECTRONIC MEDICAL RECORD SYSTEMS 7 SOFTWARE AND AN INFANT ABDUCTION 8 SECURITY SYSTEM AT WARREN GENERAL 9 HOSPITAL 575,000 10 (B) RENOVATION AND EXPANSION OF EXISTING 11 FACILITY FOR MEDICAL OFFICES AT WARREN 12 GENERAL HOSPITAL 1,350,000 13 (C) RENOVATION AND EXPANSION OF THE 14 CRITICAL CARE INPATIENT UNIT AT WARREN 15 GENERAL HOSPITAL 1,250,000 16 (D) INFRASTRUCTURE, CONSTRUCTION AND OTHER 17 RELATED COSTS FOR THE WARREN DOWNTOWN 18 ECONOMIC DEVELOPMENT PROJECT, INCLUDING 19 COMPREHENSIVE AND INTERRELATED PUBLIC 20 INFRASTRUCTURE IMPROVEMENTS AND 21 ENHANCEMENTS TO STREET CORRIDORS IN THE 22 DOWNTOWN CENTRAL BUSINESS DISTRICT 2,500,000 23 (E) ACQUISITION, INFRASTRUCTURE, 24 REDEVELOPMENT AND OTHER RELATED COSTS 25 FOR THE CONSTRUCTION OF A NEW HOTEL AND 26 CONVENTION CENTER ON WARREN'S 27 RIVERFRONT AS PART OF THE AMBITIOUS 28 IMPACT WARREN REDEVELOPMENT INITIATIVE 3,000,000 29 (63) Washington County 30 (i) County projects (Reserved) 20070H1589B3496 - 234 -
1 (ii) Allenport Borough 2 (A) Acquisition, construction, 3 infrastructure and other related costs 4 to restore the Barge Shipping facility 1,250,000 5 (II.1) BENTLEYVILLE BOROUGH <-- 6 (A) ACQUISITION, INFRASTRUCTURE 7 IMPROVEMENTS AND RECONSTRUCTION OF 8 HISTORIC BUILDINGS 500,000 9 (B) CONSTRUCTION AND EXPANSION OF THE 10 BENTWORTH SENIOR CENTER 1,000,000 11 (II.2) BROWNSVILLE TOWNSHIP <-- 12 (A) CONSTRUCTION AND OTHER RELATED COSTS 13 FOR EQUIPMENT UPGRADES AND RENOVATION 14 OF THE BROWNSVILLE HOSPITAL 10,000,000 15 (iii) California Borough 16 (A) Acquisition, construction, 17 infrastructure and other related costs 18 for the California Technology Park film 19 industry project 1,250,000 20 (iv) Canonsburg Borough 21 (A) Construction, infrastructure and other 22 related costs for the Town Park 23 project 940,000 24 (B) INFRASTRUCTURE IMPROVEMENTS AND <-- 25 CONSTRUCTION, INCLUDING ROADWAY 26 CONNECTION FOR SOUTHPOINT II PROJECT 2,000,000 27 (C) INFRASTRUCTURE AND OTHER RELATED COSTS <-- 28 FOR THE FORT PITT BRIDGEWORKS BUSINESS 29 PARK 2,500,000 30 (IV.1) CANTON TOWNSHIP 20070H1589B3496 - 235 -
1 (A) ACQUISITION, INFRASTRUCTURE 2 IMPROVEMENTS, RENOVATIONS, CONSTRUCTION 3 AND OTHER RELATED COSTS FOR JESSOP 4 PLACE 1,000,000 5 (v) Carroll Township 6 (A) Construction and other related costs 7 for the Monongahela Valley Hospital 8 upgrade project 3,000,000 9 (vi) Cecil Township 10 (A) Construction and development of 11 recreation complex near Muse School 12 property 500,000 13 (B) INFRASTRUCTURE IMPROVEMENTS AND <-- 14 CONSTRUCTION FOR SOUTHPOINT II PROJECT 4,000,000 15 (VI.1) CHARLEROI BOROUGH <-- 16 (A) CONSTRUCTION AND OTHER COSTS RELATED 17 TO THE COYLE THEATER REHABILITATION 18 PROJECT 1,400,000 19 (B) CONSTRUCTION, INFRASTRUCTURE, 20 REDEVELOPMENT AND OTHER RELATED COSTS 21 FOR THE RIVER ROOM CONFERENCE AND 22 EVENTS CENTER 1,300,000 23 (vii) Chartiers Township 24 (A) Construction and other related costs 25 for the Chartiers Township community 26 center 500,000 27 (B) Land acquisition and development of 28 Chartiers Township recreation complex 5,000,000 29 (C) INFRASTRUCTURE IMPROVEMENTS AND <-- 30 CONSTRUCTION OF PENNSYLVANIA TROLLEY 20070H1589B3496 - 236 -
1 MUSEUM VISITOR'S CENTER 8,000,000 2 (viii) City of Washington 3 (A) Construction and other related costs 4 for the Crossroads Amphitheater 1,000,000 5 (B) Construction and other related costs 6 for the redevelopment of Main and 7 Maiden Streets 15,000,000 8 (C) Improvements to the Washington Park 9 recreation facility 1,250,000 10 (D) Construction and other related costs 11 for the Main Street Works Project 12,500,000 12 (E) Acquisition of land and construction 13 of a police/fire safety building 14 complex 3,000,000 15 (F) CONSTRUCTION OF WASHINGTON AND <-- 16 JEFFERSON COLLEGE MULTIUSE ECONOMIC 17 DEVELOPMENT FACILITY 4,000,000 18 (G) CONSTRUCTION OF THE WASHINGTON 19 HOSPITAL EXPANSION PROJECT 10,000,000 20 (H) ACQUISITION, DEMOLITION AND 21 CONSTRUCTION FOR THE WHEELING STREET 22 REVITALIZATION PROJECT 4,000,000 23 (I) INFRASTRUCTURE IMPROVEMENTS AND 24 CONSTRUCTION OF THE LEYMONE CENTER 25 IMPROVEMENT PROJECT 2,000,000 26 (J) ACQUISITION, CONSTRUCTION, <-- 27 INFRASTRUCTURE, REDEVELOPMENT, 28 ABATEMENT OF HAZARDOUS MATERIALS AND 29 OTHER COSTS RELATED TO PHASE II OF THE 30 CROSSROADS PROJECT 5,000,000 20070H1589B3496 - 237 -
1 (ix) Cross Creek Township 2 (A) Construction and other related costs 3 for the Cedar Grove 4 community/recreation project 500,000 5 (x) Fallowfield Township 6 (A) Construction, infrastructure, 7 acquisition and other costs related to 8 the Shell Building and supporting 9 infrastructure in Alta Vista Business 10 Park 1,250,000 11 (X.1) JEFFERSON TOWNSHIP <-- 12 (A) INFRASTRUCTURE IMPROVEMENTS AND 13 CONSTRUCTION FOR THE MEADOWCROFT 14 ROCKSHELTER AND MUSEUM OF RURAL LIFE 2,000,000 15 (xi) Mount Pleasant Township 16 (A) Construction and other related costs 17 for the Hickory Main Street 18 revitalization 500,000 19 (xii) North Franklin Township 20 (A) Construction and other related costs 21 for a new municipal office/community 22 building 3,000,000 23 (B) ACQUISITION, CONSTRUCTION, <-- 24 INFRASTRUCTURE AND OTHER COSTS RELATED 25 TO THE WASHINGTON COUNTY 26 AIRPORT/SKYPOINTE BUSINESS PARK 2,000,000 27 (xiii) North Strabane Township 28 (A) Construction and other related costs 29 for the North Strabane Township 30 community/recreation center 1,000,000 20070H1589B3496 - 238 -
1 (B) ACQUISITION, EXPANSION, RENOVATION, <-- 2 CONSTRUCTION AND INFRASTRUCTURE 3 IMPROVEMENTS FOR THE CANONSBURG GENERAL 4 HOSPITAL CAMPUS 10,000,000 5 (xiv) Roscoe Borough 6 (A) Construction, infrastructure and other 7 related costs for community park 8 improvements 500,000 9 (XIV.1) SOUTH FRANKLIN TOWNSHIP <-- 10 (A) ACQUISITION, INFRASTRUCTURE 11 IMPROVEMENTS AND CONSTRUCTION FOR 12 SKYPOINTE INDUSTRIAL AND BUSINESS PARK 5,000,000 13 (B) CONSTRUCTION AND INFRASTRUCTURE 14 IMPROVEMENTS FOR THE MIXED-USE OFFICE 15 AND INDUSTRIAL, RESIDENTIAL AND 16 COMMERCIAL DEVELOPMENTS ALONG THE ROUTE 17 18 SOUTH CORRIDOR 5,000,000 18 (xv) South Strabane Township 19 (A) Construction, infrastructure and other 20 related costs for the Zediker Station 21 Business Park 5,000,000 22 (B) Construction and other related costs 23 for a police and road department 24 facility 875,000 25 (C) INFRASTRUCTURE IMPROVEMENTS AND <-- 26 CONSTRUCTION FOR THE MEADOWLANDS 27 INTERCHANGE REHABILITATION PROJECT 5,000,000 28 (xvi) Union Township 29 (A) Infrastructure, redevelopment, 30 abatement of hazardous materials and 20070H1589B3496 - 239 -
1 other costs related to the Phoenix 2 Business Park 1,000,000 3 (B) Phoenix Business Park, environmental <-- 4 remediation, site preparation and 5 infrastructure for development of a 58- 6 acre business park 1,000,000 7 (xvii) Washington Borough 8 (A) Construction, infrastructure, 9 acquisition and other related costs to 10 build a Washington Community Health 11 Center 1,500,000 12 (64) Wayne County 13 (i) County Projects (Reserved) <-- 14 (I) COUNTY PROJECTS <-- 15 (A) RENOVATIONS OF ATHLETIC FIELDS AND 16 SURROUNDING INFRASTRUCTURE AT THE 17 WESTERN WAYNE SCHOOL DISTRICT 500,000 18 (B) INFRASTRUCTURE, TECHNOLOGICAL 19 EQUIPMENT UPGRADES AND CONSTRUCTION OF 20 AN EMERGENCY MANAGEMENT AND 911 CENTER 2,250,000 21 (I.1) HAWLEY BOROUGH 22 (A) ACQUISITION, INFRASTRUCTURE AND OTHER 23 COSTS RELATED TO THE CONSTRUCTION OF A 24 MEDICAL CAMPUS 1,800,000 25 (ii) Palmyra Township <-- 26 (A) Construction and infrastructure 27 related to the redevelopment of the 28 Lake Wallenpaupack Visitors Center 1,000,000 29 (65) Westmoreland County 30 (i) County projects (Reserved) <-- 20070H1589B3496 - 240 -
1 (I) COUNTY PROJECTS <-- 2 (A) DESIGN AND CONSTRUCTION OF A 22,000- 3 SQUARE-FOOT HISTORY AND EDUCATION 4 CENTER AT THE HISTORIC HANNA'S TOWN 3,000,000 5 (B) INFRASTRUCTURE, CONSTRUCTION AND OTHER <-- 6 RELATED COSTS FOR THE RENOVATION AND 7 REHABILITATION OF THE LAUREL MOUNTAIN 8 SKI RESORT FACILITIES 1,500,000 9 (B) (C) WESTMORELAND CULTURAL TRUST <-- 10 (I) ACQUISITION AND REHABILITATION OF 11 A STRUCTURE IN DOWNTOWN LATROBE FOR 12 THE PURPOSES OF COMMERCIAL REUSE 13 AND DEVELOPMENT OF A DOWNTOWN 14 DESTINATION SPOT AS PART OF THE 15 LATROBE TRAIN STATION PROJECT 1,000,000 16 (II) RENOVATIONS AND REHABILITATION TO 17 THE HISTORICAL UNION TRUST 18 BUILDING 1,000,000 19 (III) ACQUISITION AND REHABILITATION 20 OF A STRUCTURE IN THE DOWNTOWN AREA 21 OF WEST NEWTON FOR THE WEST NEWTON 22 CULTURAL CENTER 1,000,000 23 (IV) ACQUISITION, REHABILITATION AND <-- 24 RENOVATIONS TO THE HISTORICAL 25 GREENSBURG CARGO TRAIN STATION FOR 26 THE PURPOSE OF PLACING THE STATION 27 BACK INTO PRODUCTIVE COMMERCIAL 28 USE 1,000,000 29 (IV) ACQUISITION, REHABILITATION AND <-- 30 RENOVATIONS TO THE HISTORICAL 20070H1589B3496 - 241 -
1 GREENSBURG CARGO TRAIN STATION,
2 INCLUDING THE ACQUISITION OF
3 ADJACENT PROPERTIES OR STRUCTURES,
4 FOR THE PURPOSE OF PLACING THE
5 STATION BACK INTO PRODUCTIVE
6 COMMERCIAL USE 3,000,000
7 (V) ACQUISITION, INFRASTRUCTURE,
8 CONSTRUCTION AND OTHER RELATED
9 COSTS FOR THE CONSTRUCTION OF A
10 175-UNIT PARKING GARAGE AS PART OF
11 THE GREENSBURG PARKING GARAGE
12 PROJECT 3,000,000
13 (VI) CONSTRUCTION OF A RAILWAY TUNNEL <--
14 EXTENSION UNDERNEATH NORFOLK
15 SOUTHERN RIGHT-OF-WAY, TO CONNECT
16 EXISTING TUNNEL AND TRUST PROPERTY
17 AT THE GREENSBURG TRAIN STATION TO
18 ALLOW PEDESTRIAN ACCESS TO AND FROM
19 SETON HILL UNIVERSITY 500,000
20 (C) (D) WESTMORELAND COUNTY COMMUNITY <--
21 COLLEGE
22 (I) INFRASTRUCTURE, CONSTRUCTION AND
23 OTHER RELATED COSTS FOR THE
24 CONSTRUCTION OF A WORKFORCE AND
25 ECONOMIC DEVELOPMENT TRAINING
26 CENTER, LOCATED IN NEW KENSINGTON 3,700,000
27 (II) INFRASTRUCTURE, CONSTRUCTION AND
28 OTHER RELATED COSTS FOR THE
29 CONSTRUCTION OF A WORKFORCE AND
30 ECONOMIC DEVELOPMENT TRAINING
20070H1589B3496 - 242 -
1 CENTER, LOCATED IN YOUNGWOOD 3,700,000 2 (III) INFRASTRUCTURE, CONSTRUCTION AND 3 OTHER RELATED COSTS TO THE 4 EXPANSION OF THE PUBLIC SAFETY 5 TRAINING CENTER 3,750,000 6 (I.1) DERRY TOWNSHIP <-- 7 (A) ACQUISITION, INFRASTRUCTURE, 8 CONSTRUCTION AND OTHER RELATED COSTS 9 FOR THE CONSTRUCTION OF A NEW FIREHOUSE 10 FOR THE BRADENVILLE VOLUNTEER FIRE 11 DEPARTMENT 600,000 12 (ii) City of Greensburg 13 (A) Construction and other costs related 14 to construction of an addition to the <-- 15 Seton Hill University Lynch Science 16 Hall 15,000,000 17 TO CONSTRUCTION OF A MEDICAL SCHOOL AT <-- 18 SETON HILL UNIVERSITY 15,000,000 19 (B) Acquisition, construction, 20 infrastructure and other related costs 21 for Greensburg Downtown revitalization 5,000,000 22 (C) Acquisition, construction, 23 infrastructure and other related costs 24 for the Westmoreland County Community 25 College Sports and Recreation Facility 6,000,000 26 (D) RENOVATION OF THE SCIENCE LABORATORIES <-- 27 LOCATED ON THE SETON HILL UNIVERSITY 28 CAMPUS 1,000,000 29 (E) RENOVATIONS AND EXPANSION OF THE 30 STUDENT CENTER FACILITIES LOCATED ON 20070H1589B3496 - 243 -
1 THE SETON HILL UNIVERSITY CAMPUS 1,000,000 2 (F) ACQUISITION, INFRASTRUCTURE, DESIGN, 3 REDEVELOPMENT AND CONSTRUCTION-RELATED 4 COSTS FOR THE EXPANSION OF THE 5 WESTMORELAND MUSEUM OF AMERICAN ART 1,250,000 6 (G) ACQUISITION, INFRASTRUCTURE, DESIGN, 7 REDEVELOPMENT AND CONSTRUCTION-RELATED 8 COSTS FOR THE TOTAL REHABILITATION OF A 9 BUILDING IN THE DOWNTOWN DISTRICT OF 10 GREENSBURG 2,500,000 11 (H) ACQUISITION, INFRASTRUCTURE, DESIGN, 12 REDEVELOPMENT AND CONSTRUCTION-RELATED 13 COSTS FOR CAPITAL IMPROVEMENTS AND 14 REDEVELOPMENT OF CULTURAL, HISTORIC AND 15 DOWNTOWN DISTRICTS OF THE CITY OF 16 GREENSBURG 2,500,000 17 (I) ACQUISITION, INFRASTRUCTURE, <-- 18 REDEVELOPMENT, CONSTRUCTION AND OTHER 19 COSTS RELATED TO THE WESTMORELAND HUMAN 20 SERVICES NEW PATHWAYS PERMANENT 21 SUPPORTIVE HOUSING PROGRAM 500,000 22 (ii.1) Hempfield Township 23 (A) Acquisition, construction, 24 infrastructure and other related costs 25 to expand Green Forge 750,000 26 (II.2) CITY OF JEANNETTE <-- 27 (A) ACQUISITION, INFRASTRUCTURE, 28 REDEVELOPMENT AND CONSTRUCTION OF A 29 15,000-SQUARE-FOOT COMMUNITY BUILDING, 30 INCLUDING PARKING FACILITIES 500,000 20070H1589B3496 - 244 -
1 (iii) Latrobe Borough 2 (A) Renovation and expansion of St. 3 Vincent College facilities 15,000,000 4 (III.1) CITY OF MONESSEN <-- 5 (A) ACQUISITION, INFRASTRUCTURE 6 IMPROVEMENTS AND CONSTRUCTION OF THE 7 CITY OF MONESSEN MUNICIPAL BUILDING 8 COMPLEX 5,000,000 9 (III.2) CITY OF NEW KENSINGTON <-- 10 (A) RENOVATION, REHABILITATION AND 11 CONSTRUCTION OF THE DOWNTOWN CENTRAL 12 BUSINESS DISTRICT 2,000,000 13 (B) ACQUISITION, RENOVATIONS, CONSTRUCTION 14 AND INFRASTRUCTURE IMPROVEMENTS FOR 15 RIVER LINE PROJECT 10,000,000 16 (C) ACQUISITION, RENOVATIONS, CONSTRUCTION 17 AND INFRASTRUCTURE IMPROVEMENTS OF THE 18 CITIZENS AMBULATORY CARE CENTER 5,000,000 19 (iv) New Kingston KENSINGTON <-- 20 (A) (D) Construction and other related <-- 21 costs for the Alle-Kiski Education 22 Center 2,500,000 23 (B) (E) ACQUISITION, INFRASTRUCTURE, <-- 24 RENOVATION AND REHABILITATION OF THE 25 CORE AREA OF THE CENTRAL BUSINESS 26 DISTRICT FROM THE RAILROAD TRACKS TO 27 INDUSTRIAL BOULEVARD AND FROM 12TH 28 STREET TO 7TH STREET 2,000,000 29 (IV) SCOTTDALE BOROUGH <-- 30 (A) ACQUISITION, CONSTRUCTION, RENOVATIONS 20070H1589B3496 - 245 -
1 AND OTHER COSTS RELATED TO THE 2 SCOTTDALE BANK BUILDING PROJECT 1,000,000 3 (B) ACQUISITION, CONSTRUCTION, RENOVATIONS 4 AND OTHER COSTS RELATED TO THE 5 SCOTTDALE BANK BUILDING PROJECT 1,000,000 6 (IV.1) TRAFFORD BOROUGH 7 (A) CONSTRUCTION AND OTHER COSTS RELATED 8 TO THE TRAFFORD BOROUGH SOCCER COMPLEX 9 FACILITY 3,600,000 10 (iv.1) (IV.2) Unity Township <-- 11 (A) Construction and other related costs <-- 12 for the St. Vincent College, School of 13 Science 15,000,000 14 (B) Renovation and expansion of facilities 15 for the Herbert W. Boyer School of 16 Natural Science, Mathematics, and 17 Computing, including construction 15,000,000 18 (A) RENOVATION AND EXPANSION OF FACILITIES <-- 19 FOR THE HERBERT W. BOYER SCHOOL OF 20 NATURAL SCIENCE, MATHEMATICS, AND 21 COMPUTING, INCLUDING CONSTRUCTION, AT 22 ST. VINCENT COLLEGE 15,000,000 23 (B) ACQUISITION, RENOVATIONS AND <-- 24 CONSTRUCTION OF A STREETSCAPE PROJECT 25 IN CONJUNCTION WITH DESIGN PROPOSAL 26 NEAR U.S. ROUTE 30 AND SR 981, SMART 27 GROWTH PARTNERSHIP OF WESTMORELAND 28 COUNTY 3,500,000 29 (v) Upper Burrell Township 30 (A) Acquisition, construction, 20070H1589B3496 - 246 -
1 infrastructure and other related costs 2 of a manufacturing campus 5,000,000 3 (V.1) VANDERGRIFT BOROUGH <-- 4 (A) ACQUISITION, CONSTRUCTION AND OTHER 5 COSTS RELATED TO THE VANDERGRIFT 6 REDEVELOPMENT PROJECT 10,000,000 7 (vi) Youngwood Borough 8 (A) Construction, redevelopment and other 9 costs related to the renovation of the 10 Westmoreland County Community College 11 Baseball Stadium 2,500,000 12 (VII) WESTMORELAND COUNTY INDUSTRIAL <-- 13 DEVELOPMENT CORPORATION 14 (A) INFRASTRUCTURE, CONSTRUCTION AND OTHER 15 RELATED COSTS FOR THE PHASE II 16 DEVELOPMENT OF THE WESTMORELAND COUNTY 17 AIRPARK 1,000,000 18 (B) INFRASTRUCTURE AND CONSTRUCTION COSTS 19 FOR THE DEVELOPMENT OF A PARCEL OF LAND 20 LOCATED IN THE WESTMORELAND 21 DISTRIBUTION PARK EAST 1,500,000 22 (C) INFRASTRUCTURE, CONSTRUCTION AND 23 RENOVATION OF THE WESTMORELAND COUNTY 24 COMMUNITY COLLEGE BASEBALL STADIUM 3,000,000 25 (D) ACQUISITION, INFRASTRUCTURE, 26 CONSTRUCTION AND OTHER RELATED COSTS 27 FOR THE DEVELOPMENT OF A 114-ACRE 28 PARCEL OF LAND LOCATED ALONG SR 1053 29 DIRECTLY OPPOSITE THE WESTMORELAND 30 COUNTY INDUSTRIAL PARK I 3,000,000 20070H1589B3496 - 247 -
1 (E) SITE DEVELOPMENT, INFRASTRUCTURE, <-- 2 CONSTRUCTION AND OTHER RELATED COSTS 3 FOR THE RESPIRONICS HEADQUARTERS CAMPUS 4 PROJECT LOCATED AT THE WESTMORELAND 5 BUSINESS AND RESEARCH PARK, INCLUDING 6 THE DEVELOPMENT OF A NEW MANUFACTURING 7 CAMPUS 500,000 8 (66) Wyoming County 9 (i) County projects (Reserved) <-- 10 (I) COUNTY PROJECTS <-- 11 (A) INFRASTRUCTURE, CONSTRUCTION AND 12 RENOVATIONS TO THE TYLER MEMORIAL 13 HOSPITAL 3,750,000 14 (ii) Tunkhannock Township 15 (A) Expansion of imaging department, 16 emergency department and outpatient 17 registration area at Tyler Memorial 18 Hospital, including construction 2,500,000 19 (I) COUNTY PROJECTS (RESERVED) <-- 20 (II) TUNKHANNOCK TOWNSHIP 21 (A) INFRASTRUCTURE, CONSTRUCTION AND 22 RENOVATIONS TO THE TYLER MEMORIAL 23 HOSPITAL, INCLUDING EXPANSION OF 24 IMAGING DEPARTMENT, EMERGENCY 25 DEPARTMENT AND OUTPATIENT REGISTRATION 26 AREA 6,250,000 27 (67) York County 28 (i) County projects (Reserved) <-- 29 (I) COUNTY PROJECTS <-- 30 (A) INFRASTRUCTURE, EQUIPMENT AND 20070H1589B3496 - 248 -
1 CONSTRUCTION OF A CIVIL WAR ERA 2 EXCURSION RAIL LINE AND HISTORIC 3 EXPERIENCE TO BE KNOWN AS STEAM INTO 4 HISTORY 1,000,000 5 (B) ACQUISITION, CONSTRUCTION AND OTHER 6 RELATED COSTS FOR A COMMUNITY COLLEGE 7 CAMPUS DEVELOPMENT IN YORK COUNTY 15,000,000 8 (ii) City of York 9 (A) Construction, infrastructure, 10 abatement of hazardous materials and 11 other costs related to the Government 12 Center Renovation Project 8,500,000 13 (B) Acquisition, construction, 14 infrastructure and other related costs 15 for downtown community college campus 7,000,000 16 (C) Construction, acquisition, 17 redevelopment, abatement of hazardous 18 materials and other costs related to 19 the Downtown York Historic Preservation 20 and Revitalization Project 9,000,000 21 (D) ACQUISITION, CONSTRUCTION, <-- 22 INFRASTRUCTURE, REDEVELOPMENT AND OTHER 23 COSTS RELATED TO THE YORK MUSEUM OF 24 ART, CULTURAL CENTER AND CENTRAL MARKET 25 UPGRADES 22,000,000 26 (II.1) CITY OF YORK AND SPRING GARDEN TOWNSHIP 27 (A) ACQUISITION, INFRASTRUCTURE, 28 REDEVELOPMENT AND OTHER COSTS RELATED 29 TO THE YORK COLLEGE WEST CAMPUS 30 REHABILITATION PROJECT 4,000,000 20070H1589B3496 - 249 -
1 (II.2) RED LION BOROUGH 2 (A) STREETSCAPE IMPROVEMENTS, INCLUDING 3 NECESSARY COSTS 1,550,000 4 (iii) Springettsbury Township 5 (A) Construction, infrastructure, 6 abatement of hazardous materials and 7 other costs associated with the 8 Pleasant Acres Renovation Project 11,250,000 9 (B) CONSTRUCTION OF A FACILITY TO HOUSE A <-- 10 YOUTH DEVELOPMENT CENTER 13,500,000 11 (iv) West Manheim Township 12 (A) Redevelopment of South Western 13 Elementary School for use as township 14 administrative offices, including 15 construction and related 16 infrastructure 2,000,000 17 (V) YORK TOWNSHIP <-- 18 (A) ACQUISITION, INFRASTRUCTURE AND 19 RENOVATIONS FOR THE DEVELOPMENT OF 20 PERSONAL CARE HOMES FOR THE ELDERLY 1,000,000 21 (68) Multiple Counties 22 (i) Butler and Mercer Counties 23 (A) Slippery Rock and Liberty Townships 24 (I) Acquisition and development of 25 Slippery Rock Business Park, 26 including related infrastructure 1,250,000 27 (B) COMMUNITY DEVELOPMENT CORPORATION OF <-- 28 BUTLER COUNTY 29 (I) ACQUISITION, INFRASTRUCTURE, 30 CONSTRUCTION AND DEVELOPMENT OF 20070H1589B3496 - 250 -
1 PHASE I OF THE SLIPPERY ROCK 2 BUSINESS PARK II 1,250,000 3 (II) ERIE, MCKEAN AND WARREN COUNTIES 4 (A) CITY OF CORRY REDEVELOPMENT AUTHORITY 5 (I) INFRASTRUCTURE, CONSTRUCTION AND 6 OTHER RELATED COSTS FOR THE 7 INSTALLATION OF SONET-BASED FIBER 8 OPTIC TELECOMMUNICATIONS 9 INFRASTRUCTURE ALONG THE ROUTE 6 10 CORRIDOR BETWEEN UNION CITY, ERIE 11 COUNTY, AND COUDERSPORT, POTTER 12 COUNTY 4,250,000 13 (III) LUZERNE AND SCHUYLKILL COUNTIES 14 (A) COUNTY PROJECTS 15 (I) ACQUISITION, CONSTRUCTION, 16 INFRASTRUCTURE AND OTHER RELATED 17 COSTS FOR THE DEVELOPMENT OF A 18 CARGO AIRPORT 250,000,000 19 (ii) (IV) Snyder and Union Counties <-- 20 (A) County projects 21 (I) Acquisition, construction, 22 infrastructure and other related 23 costs for the Greater Susquehanna 24 Valley YMCA 3,000,000 25 (V) MONTOUR, NORTHUMBERLAND, SNYDER AND UNION <-- 26 COUNTIES 27 (A) GREATER SUSQUEHANNA KEYSTONE <-- 28 INNOVATION ZONE 29 (A) COUNTY PROJECTS <-- 30 (I) CONSTRUCTION, RENOVATIONS AND 20070H1589B3496 - 251 -
1 OTHER RELATED COSTS FOR A NEW 2 INNOVATION CENTER 3,000,000 3 (VI) WESTMORELAND AND ALLEGHENY COUNTIES 4 (A) TRAFFORD BOROUGH 5 (I) CONSTRUCTION, SITE PREPARATION, 6 RENOVATIONS, UPGRADES, 7 INFRASTRUCTURE IMPROVEMENTS FOR 8 DEVELOPMENT OF COMMERCIAL SPACE AT 9 THE TRAFFORD COMMERCE CENTER 4,000,000 10 (VII) CARBON AND MONROE COUNTIES 11 (A) POCONO REGION 12 (I) POCONO MOUNTAINS WAYFINDING 13 SIGNING PROGRAM 1,000,000 14 (VIII) MONTGOMERY AND PHILADELPHIA COUNTIES <-- 15 (A) ENGINEERING AND CONSTRUCTION OF 16 CRESHEIM MULTIUSE TRAIL BETWEEN VALLEY 17 GREEN IN FAIRMOUNT PARK IN PHILADELPHIA 18 AND FORT WASHINGTON STATE PARK 2,500,000 19 (IX) LAWRENCE AND BEAVER COUNTIES <-- 20 (A) INFRASTRUCTURE IMPROVEMENTS AND 21 CONSTRUCTION OF A NATIONAL CHARACTER 22 EDUCATION FOUNDATION TRAINING 23 HEADQUARTERS 6,000,000 24 (X) CARBON AND LEHIGH COUNTIES 25 (A) CONSTRUCTION, INFRASTRUCTURE, 26 REDEVELOPMENT AND OTHER RELATED COSTS 27 FOR THE LEHIGH GAP NATURE CENTER 28 EXPANSION 1,500,000 29 Section 7. Itemization of flood control projects. 30 Additional capital projects in the category of flood control 20070H1589B3496 - 252 -
1 projects to be constructed by the Department of Environmental
2 Protection, its successors or assigns, and to be financed by the
3 incurring of debt are hereby itemized, together with their
4 respective estimated costs, as follows:
5 Total
6 Project
7 Project Allocation
8 (1) Department of Environmental Protection
9 (I) ALLEGHENY COUNTY <--
10 (A) CONSTRUCTION, INFRASTRUCTURE,
11 ABATEMENT OF HAZARDOUS MATERIALS AND
12 OTHER COSTS RELATED TO THE NORTH HILLS
13 FLOOD PREVENTION PROJECT 2,000,000
14 (B) CONSTRUCTION, INFRASTRUCTURE AND OTHER
15 RELATED COSTS FOR THE PENN HILLS
16 STORMWATER MANAGEMENT PROJECT 1,200,000
17 (i) (I.1) Blair County <--
18 (A) Construction, infrastructure and other
19 related costs for the Mill Run
20 Rehabilitation Project 76,000
21 (I.2) CARBON COUNTY <--
22 (A) CONSTRUCTION, INFRASTRUCTURE AND OTHER
23 RELATED COSTS FOR THE TOWAMENSING
24 TRAILS DAM REHABILITATION PROJECT 1,250,000
25 (ii) Chester County
26 (A) Construction, infrastructure and other
27 related costs for the Business 30 Flood
28 Control Project 900,000
29 (II.1) CLEARFIELD COUNTY <--
30 (A) CONSTRUCTION, INFRASTRUCTURE AND OTHER
20070H1589B3496 - 253 -
1 RELATED COSTS FOR FLOOD PROTECTION 2 PROJECTS IN CHESTER HILL BOROUGH 3,000,000 3 (B) CONSTRUCTION, INFRASTRUCTURE AND OTHER 4 RELATED COSTS FOR FLOOD PROTECTION 5 PROJECTS IN COALPORT BOROUGH 300,000 6 (II.1) (II.2) CLINTON COUNTY <-- 7 (A) PINE CREEK TOWNSHIP, CONSTRUCTION, 8 REDEVELOPMENT AND OTHER COSTS RELATED 9 TO THE CHATHAM RUN LEVEE PROJECT 7,500,000 10 (iii) Columbia County 11 (A) Fishing Creek Flood Control Project, 12 including gravel bar removal 1,000,000 13 (iv) Crawford County 14 (A) Conneautville Dam rehabilitation 750,000 15 (IV.1) DERRY TOWNSHIP <-- 16 (A) STORMWATER CONTROL PROJECT IN DERRY 17 TOWNSHIP 8,000,000 18 (B) STORMWATER CONTROL PROJECT IN LOWER 19 SWATARA TOWNSHIP 6,000,000 20 (IV.1) (IV.2) INDIANA COUNTY <-- 21 (A) ACQUISITION AND CONSTRUCTION OF A 22 FLOOD CONTROL PROJECT DESIGNED BY THE 23 ARMY CORPS OF ENGINEERS 2,000,000 24 (v) Monroe County 25 (A) Additional funds to refurbish Brady's 26 Lake Dam in order to rebid the project <-- 27 due to delays and poor performance in 28 concrete mix design 3,600,000 29 LAKE DAM 3,600,000 <-- 30 (B) FLOOD CONTROL PROJECT IN PARADISE <-- 20070H1589B3496 - 254 -
1 TOWNSHIP 1,500,000 2 (V.1) MONTGOMERY COUNTY 3 (A) CONSTRUCTION, INFRASTRUCTURE AND OTHER 4 RELATED COSTS FOR THE JENKINTOWN FLOOD 5 CONTROL PROJECT 1,200,000 6 (vi) Northumberland County 7 (A) Construction, infrastructure and other 8 related costs for the Susquehanna River 9 Clearing and Grubbing Project 200,000 10 (B) Construction, infrastructure and other 11 related costs for the Reagan Street 12 Underpass Flooding Abatement Project 2,200,000 13 (C) SHORELINE STABILIZATION FOR FLOOD <-- 14 CONTROL SYSTEM IN SUNBURY BOROUGH 750,000 15 (VI.1) POTTER COUNTY 16 (A) REPAIR AND REHABILITATION OF THE NORTH 17 FORK DAM 2,000,000 18 (vii) Schuylkill County 19 (A) Repairs to the two Owl Creek dams, 20 including breast repairs and spillway 21 construction in Borough of Tamaqua 3,000,000 22 (B) Reconstruction of Wabash Creek storm 23 water tunnel and diversion system in 24 Borough of Tamaqua 5,000,000 25 (C) CONSTRUCTION, INFRASTRUCTURE AND OTHER <-- 26 COSTS RELATED TO KLINGERTOWN FLOOD 27 CONTROL 8,100,000 28 (viii) Somerset County 29 (A) Construction, infrastructure and other 30 related costs for the East Main Street 20070H1589B3496 - 255 -
1 Flood Protection Project 5,000,000 2 (IX) WASHINGTON COUNTY <-- 3 (A) RECONSTRUCTION AND STABILIZATION OF 4 CANONSBURG DAM, INCLUDING SPILLWAY AND 5 BREAST WORKS 8,000,000 6 Section 8. Itemization of Keystone Recreation, Park and 7 Conservation Fund projects. 8 Projects in the category of public improvement projects to be 9 constructed by the Department of Conservation and Natural 10 Resources, its successors or assigns, and to be financed by 11 current revenues of the Keystone Recreation, Park and 12 Conservation Fund are hereby itemized, together with their 13 respective estimated costs, as follows: 14 Total 15 Project 16 Project Allocation 17 (1) Department of Conservation and Natural 18 Resources 19 (i) Black Moshannon State Park 20 (A) Rehabilitate dam spillway and boat 21 launch 400,000 22 (Base Project Allocation - $400,000) 23 (ii) Blue Knob State Park 24 (A) Rehabilitate park facilities 900,000 25 (Base Project Allocation - $900,000) 26 (B) Rehabilitate day use area 1,000,000 27 (Base Project Allocation - $1,000,000) 28 (iii) Caledonia State Park 29 (A) Replace two bridges on main park road 600,000 30 (Base Project Allocation - $600,000) 20070H1589B3496 - 256 -
1 (B) Rehabilitate park campgrounds 1,100,000 2 (Base Project Allocation - $1,100,000) 3 (iv) Codorus State Park 4 (A) Provide paving in park 350,000 5 (Base Project Allocation - $350,000) 6 (v) Denton Hill State Park 7 (A) Replace main park road/parking area 400,000 8 (Base Project Allocation - $400,000) 9 (vi) Forest District 19 10 (A) Rehabilitate Egypt Meadows Dam 750,000 11 (Base Project Allocation - $750,000) 12 (vii) Forest District 20 13 (A) Provide new resource management 14 center 4,000,000 15 (Base Project Allocation - $4,000,000) 16 (viii) Little Pine State Park 17 (A) Renovate restroom and lower picnic 18 area 300,000 19 (Base Project Allocation - $300,000) 20 (ix) Moshannon State Forest 21 (A) Provide cleanup to Quehanna reactor 22 site 2,400,000 23 (Base Project Allocation - $2,400,000) 24 (x) Prince Gallitzin State Park 25 (A) Replace two restrooms at the park 300,000 26 (Base Project Allocation - $300,000) 27 (B) Pave roads within the park 350,000 28 (Base Project Allocation - $350,000) 29 (xi) Reeds Gap State Park 30 (A) Relocate park office building 1,500,000 20070H1589B3496 - 257 -
1 (Base Project Allocation - $1,500,000) 2 (B) Replace existing swimming pool 1,000,000 3 (Base Project Allocation - $1,000,000) 4 (xii) S.B. Elliott State Park 5 (A) Provide ADA cabins and renovate 6 washhouse 1,250,000 7 (Base Project Allocation - $1,250,000) 8 (xiii) Shawnee State Park 9 (A) Repair joints in concrete spillway 300,000 10 (Base Project Allocation - $300,000) 11 (xiv) Shikellamy State Park 12 (A) Project (PW 4182) to provide dock 13 rehabilitation transient and launch 14 areas 663,000 15 (Base Project Allocation - $663,000) 16 (B) Renovate overlook road in the park 400,000 17 (Base Project Allocation - $400,000) 18 (xv) Sinnemahoning State Park 19 (A) Repair dam spillway 650,000 20 (Base Project Allocation - $650,000) 21 (xvi) Various Parks and Forest Districts, 22 Statewide 23 (A) Acquire land to be incorporated within 24 the park system according to the 25 Commonwealth's master plan 10,000,000 26 (Land Allocation - $10,000,000) 27 Section 9. Itemization of Environmental Stewardship Fund 28 projects. 29 Projects in the category of public improvement projects to be 30 constructed by the Department of Conservation and Natural 20070H1589B3496 - 258 -
1 Resources, its successors or assigns and to be financed by 2 current revenues of the Environmental Stewardship Fund are 3 hereby itemized together with their respective estimated 4 financial costs as follows: 5 Total 6 Project 7 Project Allocation 8 (1) Department of Conservation and Natural 9 Resources 10 (i) Bald Eagle State Park 11 (A) Rehabilitate roads within the park 1,600,000 12 (Base Project Allocation - $1,600,000) 13 (B) Replace courtesy docks at eight public 14 boat launches 300,000 15 (Base Project Allocation - $300,000) 16 (C) Rehabilitate office and visitors' 17 center 1,750,000 18 (Base Project Allocation - $1,750,000) 19 (ii) Beltzville State Park 20 (A) Rehabilitate sewage treatment plant 21 and correct sewer line infiltration 400,000 22 (Base Project Allocation - $400,000) 23 (iii) Bendigo State Park 24 (A) Replace bathhouse, lifeguard station 25 and day use restrooms in the park 1,000,000 26 (Base Project Allocation - $1,000,000) 27 (iv) Canoe Creek State Park 28 (A) Rehabilitate sewage treatment plant 300,000 29 (Base Project Allocation - $300,000) 30 (v) Chapman State Park 20070H1589B3496 - 259 -
1 (A) Rehabilitate beach house and comfort 2 station 1,900,000 3 (Base Project Allocation - $1,900,000) 4 (vi) Cherry Springs State Park 5 (A) Replace pit latrines with flush 6 restrooms and sewers 770,000 7 (Base Project Allocation - $770,000) 8 (vii) Clear Creek State Park 9 (A) Rehabilitate water system and replace 10 pit latrines 2,000,000 11 (Base Project Allocation - $2,000,000) 12 (B) Rehabilitate park roads and bridges 1,500,000 13 (Base Project Allocation - $1,500,000) 14 (viii) Colonel Denning State Park 15 (A) Provide new day restroom, sewage and 16 shower house 350,000 17 (Base Project Allocation - $350,000) 18 (B) Provide bathhouse, concession, 19 restroom and sewage 500,000 20 (Base Project Allocation - $500,000) 21 (ix) Cook Forest State Park 22 (A) Rehabilitation of trail, Phase II 250,000 23 (Base Project Allocation - $250,000) 24 (B) Rehabilitate five campground 25 washhouses 600,000 26 (Base Project Allocation - $600,000) 27 (C) Replace park office and visitors' 28 center 2,000,000 <-- 29 (Base Project Allocation - $2,000,000) 30 CENTER 2,500,000 <-- 20070H1589B3496 - 260 -
1 (BASE PROJECT ALLOCATION - $2,500,000) 2 (D) Replace six river cabins 2,200,000 3 (Base Project Allocation - $2,200,000) 4 (E) Rehabilitate sewage system and 5 repairs 750,000 6 (Base Project Allocation - $750,000) 7 (F) Provide repairs to the water system 750,000 8 (Base Project Allocation - $750,000) 9 (G) Rehabilitate road and parking lot 1,100,000 10 (Base Project Allocation - $1,100,000) 11 (x) Colton Point State Park 12 (A) Replace two pit latrines with 13 composting restroom, playground, picnic 14 area and campground shower house 1,500,000 15 (Base Project Allocation - $1,500,000) 16 (xi) Elk State Park 17 (A) Replace comfort station 150,000 18 (Base Project Allocation - $150,000) 19 (xii) Erie Bluffs State Park 20 (A) Construct entrance to the park 300,000 21 (Base Project Allocation - $300,000) 22 (xiii) Evansburg State Park 23 (A) Provide road paving for the park 335,000 24 (Base Project Allocation - $335,000) 25 (B) Replace sewer lines 250,000 26 (Base Project Allocation - $250,000) 27 (C) Replace temporary restrooms, Phase II 250,000 28 (Base Project Allocation - $250,000) 29 (xiv) Forest District 2 30 (A) Construct new resource management 20070H1589B3496 - 261 -
1 center 3,500,000 2 (Base Project Allocation - $3,500,000) 3 (xv) Forest District 3 4 (A) Establish new maintenance headquarter 5 buildings in Juniata, Mifflin and Perry 6 Counties 800,000 7 (Base Project Allocation - $800,000) 8 (B) Rehabilitate Gunter Valley Dam in 9 Perry County 5,000,000 10 (Base Project Allocation - $5,000,000) 11 (xvi) Forest District 4 12 (A) Rehabilitate Linn Run Road 2,500,000 13 (Base Project Allocation - $2,500,000) 14 (xvii) Forest District 5 15 (A) Rehabilitate resource management 16 center 1,500,000 17 (Base Project Allocation - $1,500,000) 18 (xviii) Forest District 8 19 (A) Rehabilitate Kittanning Resource 20 Management Center 1,500,000 21 (Base Project Allocation - $1,500,000) 22 (xix) Forest District 14 23 (A) Rehabilitate historic stone house 250,000 24 (Base Project Allocation - $250,000) 25 (xx) Forest District 18 26 (A) SR 54 comfort station and parking 500,000 27 (Base Project Allocation - $500,000) 28 (B) New resource management center 3,500,000 29 (Base Project Allocation - $3,500,000) 30 (C) Rehabilitate Roaring Creek tract 20070H1589B3496 - 262 -
1 facilities 600,000 2 (Base Project Allocation - $600,000) 3 (D) Rehabilitate Roaring Creek tract 4 trails and bridges 1,155,000 5 (Base Project Allocation - $1,155,000) 6 (E) Maintenance to Haldeman complex 300,000 7 (Base Project Allocation - $300,000) 8 (xxi) Forest District 19 9 (A) New resource management center 3,500,000 10 (Base Project Allocation - $3,500,000) 11 (B) Rehabilitate Little Summit Fire 12 Station maintenance complex 300,000 13 (Base Project Allocation - $300,000) 14 (C) Project for Pine Flats Road 200,000 15 (Base Project Allocation - $200,000) 16 (D) Project for Flat Ridge Road 200,000 17 (Base Project Allocation - $200,000) 18 (xxii) Forest District 20 19 (A) Pave Dry Run Road 300,000 20 (Base Project Allocation - $300,000) 21 (B) Provide for Hillsgrove storage 22 building 300,000 23 (Base Project Allocation - $300,000) 24 (C) Pave High Knob Road 500,000 25 (Base Project Allocation - $500,000) 26 (xxiii) Frances Slocum State Park 27 (A) Rehabilitate sewage treatment plant 28 and lines 600,000 <-- 29 (Base Project Allocation - $600,000) 30 AND LINES 1,500,000 <-- 20070H1589B3496 - 263 -
1 (BASE PROJECT ALLOCATION - $1,500,000) 2 (xxiv) French Creek State Park 3 (A) Rehabilitate Scotts Run area 1,500,000 4 (Base Project Allocation - $1,500,000) 5 (xxv) Gifford Pinchot State Park 6 (A) Phase II rehabilitation of camp area 7 washhouse 400,000 8 (Base Project Allocation - $400,000) 9 (xxvi) Gouldsboro State Park 10 (A) Repair dam at the park 750,000 11 (Base Project Allocation - $750,000) 12 (B) Replace pit bathhouse, comfort station 13 and boat rental 600,000 14 (Base Project Allocation - $600,000) 15 (xxvii) Greenwood Furnace State Park 16 (A) Make repairs to sewage treatment 17 plant 900,000 18 (Base Project Allocation - $900,000) 19 (xxviii) Hickory Run State Park 20 (A) Replace pit latrines and water tank 1,800,000 21 (Base Project Allocation - $1,800,000) 22 (B) Phase II of group camp roof 23 replacement 200,000 24 (Base Project Allocation - $200,000) 25 (C) Replace office and visitors' center 2,000,000 26 (Base Project Allocation - $2,000,000) 27 (D) Replace pit toilets and four 28 buildings 1,250,000 29 (Base Project Allocation - $1,250,000) 30 (xxix) Hills Creek State Park 20070H1589B3496 - 264 -
1 (A) Rehabilitate spillway 600,000 2 (Base Project Allocation - $600,000) 3 (B) Provide office renovation addition and 4 visitors' center 2,100,000 5 (Base Project Allocation - $2,100,000) 6 (xxx) Hyner Run State Park 7 (A) Rehabilitate two park bridges and pave 8 roadway 600,000 9 (Base Project Allocation - $600,000) 10 (B) Replace two day use restrooms 300,000 11 (Base Project Allocation - $300,000) 12 (xxxi) Kettle Creek State Park 13 (A) Provide bathhouse, shower house and 14 sewage 1,800,000 15 (Base Project Allocation - $1,800,000) 16 (xxxii) Kooser State Park 17 (A) Rehabilitate park roads and bridges 1,300,000 <-- 18 (A) REHABILITATE MAIN PARK ROAD AND <-- 19 REPLACE TWO BRIDGES 1,300,000 20 (Base Project Allocation - $1,300,000) 21 (xxxiii) Lackawanna State Park 22 (A) Replace park office 1,500,000 23 (Base Project Allocation - $1,500,000) 24 (B) Rehabilitate pool complex and day use 25 area 3,000,000 26 (Base Project Allocation - $3,000,000) 27 (xxxiv) Laurel Hill State Park 28 (A) Breach Spruce Run Dam 250,000 29 (Base Project Allocation - $250,000) 30 (B) Provide Jones Mill Run Dam dredging 250,000 20070H1589B3496 - 265 -
1 (Base Project Allocation - $250,000) 2 (C) Rehabilitate group camp three sewage 3 lines 250,000 4 (Base Project Allocation - $250,000) 5 (D) Provide camping cottage shower house 6 at the park 650,000 7 (Base Project Allocation - $650,000) 8 (E) Rehabilitate contact station and 9 parking 500,000 10 (Base Project Allocation - $500,000) 11 (xxxv) Laurel Ridge State Park 12 (A) Replace turnpike trail bridge 13 superstructure 1,200,000 14 (Base Project Allocation - $1,200,000) 15 (xxxvi) Little Pine State Park 16 (A) Rehabilitate dam 500,000 17 (Base Project Allocation - $500,000) 18 (xxxvii) Lyman Run State Park 19 (A) Provide construction to the spillway 20 bridge 500,000 21 (Base Project Allocation - $500,000) 22 (xxxviii) Marsh Creek State Park 23 (A) Pave all parking lots in the park 325,000 24 (Base Project Allocation - $325,000) 25 (B) Provide ADA office expansion 150,000 26 (Base Project Allocation - $150,000) 27 (xxxix) McConnells Mill State Park 28 (A) Rehabilitate the park road 275,000 29 (Base Project Allocation - $275,000) 30 (xl) Moraine State Park 20070H1589B3496 - 266 -
1 (A) Resurface bike trail in park 1,200,000 2 (Base Project Allocation - $1,200,000) 3 (B) Rehabilitate Old 422 launch and road 1,000,000 4 (Base Project Allocation - $1,000,000) 5 (xli) Neshaminy State Park 6 (A) Rehabilitate jetty 350,000 7 (Base Project Allocation - $350,000) 8 (xlii) Nockamixon State Park 9 (A) Provide paving in the park 500,000 10 (Base Project Allocation - $500,000) 11 (B) Replace three pit toilets 1,000,000 12 (Base Project Allocation - $1,000,000) 13 (xliii) Ohiopyle State Park 14 (A) Rehabilitate residence 250,000 15 (Base Project Allocation - $250,000) 16 (B) Replace bridge 0902-CSX 2288 300,000 17 (Base Project Allocation - $300,000) 18 (C) Construct parking above new office 900,000 19 (Base Project Allocation - $900,000) 20 (D) Provide park office accessibility 2,000,000 21 (Base Project Allocation - $2,000,000) 22 (E) Provide bathhouse, shower house and 23 sewage 275,000 24 (Base Project Allocation - $275,000) 25 (xliv) Oil Creek State Park 26 (A) Rehabilitate Boughton Bridge 400,000 27 (Base Project Allocation - $400,000) 28 (B) Phase I to repair trail slips 300,000 29 (Base Project Allocation - $300,000) 30 (xlv) Parker Dam State Park 20070H1589B3496 - 267 -
1 (A) Rehabilitate dam spillway 350,000 2 (Base Project Allocation - $350,000) 3 (xlvi) Park Region 1 4 (A) Rehabilitate surface water 5 systems/filter 300,000 6 (Base Project Allocation - $300,000) 7 (B) Rehabilitate surface and well water 8 supplies in Region 1 State parks 1,500,000 9 (Base Project Allocation - $1,500,000) 10 (xlvii) Park Region 2 11 (A) Rehabilitate the residence 250,000 12 (Base Project Allocation - $250,000) 13 (xlviii) Pine Grove Furnace State Park 14 (A) Rehabilitate water treatment plant 2,000,000 15 (Base Project Allocation - $2,000,000) 16 (B) Rehabilitate various buildings 3,400,000 17 (Base Project Allocation - $3,400,000) 18 (xlix) Presque Isle State Park 19 (A) Provide bike trail extension to the 20 Tom Ridge Environmental Center 1,800,000 21 (Base Project Allocation - $1,800,000) 22 (l) Prince Gallitzin State Park 23 (A) Rehabilitate sewage treatment plant 800,000 24 (Base Project Allocation - $800,000) 25 (B) Rehabilitate Beaver Valley Marina 2,900,000 26 (Base Project Allocation - $2,900,000) 27 (li) Promised Land State Park 28 (A) Rehabilitate sewer line 750,000 29 (Base Project Allocation - $750,000) 30 (B) Replace bridge and spillway 3,100,000 20070H1589B3496 - 268 -
1 (Base Project Allocation - $3,100,000) 2 (C) Rehabilitate Pickerel Point and 3 Deerfield campgrounds 3,000,000 4 (Base Project Allocation - $3,000,000) 5 (D) Rehabilitate boat rental area 500,000 6 (Base Project Allocation - $500,000) 7 (E) Rehabilitate dump station 300,000 8 (Base Project Allocation - $300,000) 9 (F) Rehabilitate bridges 120,000 10 (Base Project Allocation - $120,000) 11 (lii) Pymatuning State Park 12 (A) Rehabilitate Espyville south launch 13 and environs 1,500,000 14 (Base Project Allocation - $1,500,000) 15 (B) Rehabilitate Jamestown beach house 650,000 16 (Base Project Allocation - $650,000) 17 (C) Rehabilitate sanitary facilities on 18 the west side 2,200,000 19 (Base Project Allocation - $2,200,000) 20 (liii) Raccoon Creek State Park 21 (A) Provide roadway slip repairs 800,000 22 (Base Project Allocation - $800,000) 23 (B) Phase II rehabilitation of roads 300,000 24 (Base Project Allocation - $300,000) 25 (liv) Ralph Stover State Park 26 (A) Replace pit latrines and sewer 500,000 27 (Base Project Allocation - $500,000) 28 (lv) Ricketts Glen State Park 29 (A) Rehabilitate bathhouse and comfort 30 stations 2,800,000 20070H1589B3496 - 269 -
1 (Base Project Allocation - $2,800,000) 2 (B) Rehabilitate roads and provide paving 3 for parking lots 650,000 4 (Base Project Allocation - $650,000) 5 (C) Replace pit latrine Route 118 picnic 6 area 400,000 7 (Base Project Allocation - $400,000) 8 (D) Repair infiltration, sewage treatment 9 plant and water system 550,000 10 (Base Project Allocation - $550,000) 11 (lvi) Ridley Creek State Park 12 (A) Reroof maintenance building 400,000 13 (Base Project Allocation - $400,000) 14 (B) Pave parking lot 300,000 15 (Base Project Allocation - $300,000) 16 (lvii) Salt Springs State Park 17 (A) Replace vault latrine 300,000 18 (Base Project Allocation - $300,000) 19 (lviii) Samuel S. Lewis State Park 20 (A) Provide two new comfort stations with 21 on-lot sewage 750,000 22 (Base Project Allocation - $750,000) 23 (lix) Shawnee State Park 24 (A) Rehabilitate water treatment plant 1,200,000 25 (Base Project Allocation - $1,200,000) 26 (lx) Sinnemahoning State Park 27 (A) Rehabilitate main park road and 28 replace bridges 1,000,000 29 (Base Project Allocation - $1,000,000) 30 (lxi) Sizerville State Park 20070H1589B3496 - 270 -
1 (A) Modernize pit latrines and bathhouse 2,000,000 2 (Base Project Allocation - $2,000,000) 3 (B) Provide new park office and visitors' 4 center 1,800,000 5 (Base Project Allocation - $1,800,000) 6 (lxii) Tiadaghton State Forest 7 (A) Construct Tiadaghton Management 8 Center 4,500,000 9 (Base Project Allocation - $4,500,000) 10 (lxiii) Tobyhanna State Park 11 (A) Rehabilitate day use area and 12 campground 2,500,000 13 (Base Project Allocation - $2,500,000) 14 (lxiv) Whipple Dam State Park 15 (A) Provide new multifunction beach 16 building 1,200,000 17 (Base Project Allocation - $1,200,000) 18 (lxv) Yellow Creek State Park 19 (A) Provide camping cottage shower house 650,000 20 (Base Project Allocation - $650,000) 21 (lxvi) White Clay Creek Preserve 22 (A) Rebuild London Tract wall 150,000 23 (Base Project Allocation - $150,000) 24 (lxvii) Worlds End State Park 25 (A) Rehabilitate campground and day use 26 area roads 350,000 27 (Base Project Allocation - $350,000) 28 (lxviii) Various parks, Statewide 29 (A) Acquire land to be incorporated within 30 the park system according to the 20070H1589B3496 - 271 -
1 Commonwealth's master plan 10,000,000 2 (Land Allocation - $10,000,000) 3 Section 10. Itemization of State forestry bridge projects. 4 Projects in the category of State forestry bridge projects to 5 be constructed by the Department of Conservation and Natural 6 Resources, its successors or assigns, and to be financed by oil 7 company franchise tax revenues pursuant to 75 Pa.C.S. § 8 9502(a)(2)(iv) (relating to imposition of tax) are hereby 9 itemized, together with their respective estimated costs, as 10 follows: 11 Total 12 Project 13 Project Allocation 14 (1) Centre County 15 (i) Forest District 9 16 (A) Project for Meyers Run Road and Black 17 Moshannon Creek 400,000 18 (B) Project for North Run Road over Smays 19 Run 300,000 20 (2) Clearfield County 21 (i) Forest District 9 22 (A) Project for Shirks Road over Black 23 Moshannon Creek bridge No. 9-0028 300,000 24 (B) Project for Reservoir Road over Upper 25 Three Run 300,000 26 (C) Project for Little Medix Road over 27 Little Medix Run, bridge No. 9-0012 300,000 28 (3) Clinton County 29 (i) Forest District 10 30 (A) Project for Beaver Dam Road over 20070H1589B3496 - 272 -
1 Beaver Dam Run 300,000 2 (B) Project for Birch Island Road over 3 Amos Branch, bridge No. 10-0040 300,000 4 (4) Elk County 5 (i) Forest District 13 6 (A) Project for East Hicks Road over Barr 7 Hollow 300,000 8 (B) Project for Little Dents Road over 9 Dents Run Bridge No. 13-0032 300,000 10 (C) Project for Dents Run Road over Little 11 Bear Run 300,000 12 (D) Project for Dents Run Road over 13 Weatherboard Run 300,000 14 (E) Project for bridge over North Fork 300,000 15 (5) Huntingdon County 16 (i) Forest District 5 17 (A) Project for Krise Valley Road bridge 300,000 18 (6) Lycoming County 19 (i) Forest District 12 20 (A) Project for Trout Run Road and 21 bridges 600,000 22 (B) Project for Frances Road over unnamed 23 tributary near Black Forest Trail 300,000 24 (7) Perry County 25 (i) Forest District 3 26 (A) Project for the Second Narrows Road 27 bridge 300,000 28 (8) Tioga County 29 (i) Forest District 12 30 (A) Project for Francis Road over unnamed 20070H1589B3496 - 273 -
1 tributary at Pipeline Road 300,000 2 (B) Project for Francis Road over Woodward 3 Hollow 300,000 4 (C) Project for Francis Road over Randall 5 Hollow bridge No. 12-9003 300,000 6 (D) Project for Francis Road over Kramer 7 Hollow bridge No. 12-9016 300,000 8 (E) Project for Francis Road over Francis 9 Branch bridge No. 12-0048 300,000 10 (ii) Forest District 16 11 (A) Project for Spoor Hollow Road over 12 Norris Brook bridge No. 16-0001 300,000 13 (B) Project for Cedar Mountain Road over 14 Cedar Run bridge No. 16-0014 300,000 15 (9) Union County 16 (i) Forest District 7 17 (A) Replace Brandon Road bridge 300,000 18 (B) Project for Cooper Mill Road bridge 300,000 19 (10) Clearfield and Elk Counties 20 (i) Forest District 9 21 (A) Project for three culverts on Little 22 Medix Road over Little Medix Run 400,000 23 Section 11. Itemization of General Fund current revenue 24 projects. 25 The individual capital projects in the category of public 26 improvement projects to be constructed or acquired by the 27 Department of General Services, its successors or assigns, and 28 to be financed from General Fund current revenues, are hereby 29 itemized, together with their respective estimated financial 30 costs, as follows: 20070H1589B3496 - 274 -
1 Total 2 Project 3 Project Allocation 4 (1) Department of Corrections 5 (i) State Correctional Institution at Albion 6 (A) Lease and/or purchase an emergency 7 housing facility along with related 8 infrastructure improvements 2,000,000 <-- 9 (Base Project Allocation - $2,000,000) 10 INFRASTRUCTURE IMPROVEMENTS 2,500,000 <-- 11 (BASE PROJECT ALLOCATION - $2,500,000) 12 (ii) State Correctional Institution at 13 Cambridge Springs 14 (A) Lease and/or purchase an emergency 15 housing facility along with related 16 infrastructure improvements 2,000,000 <-- 17 (Base Project Allocation - $2,000,000) 18 INFRASTRUCTURE IMPROVEMENTS 2,500,000 <-- 19 (BASE PROJECT ALLOCATION - $2,500,000) 20 (iii) State Correctional Institution at 21 Greensburg 22 (A) Lease and/or purchase an emergency 23 housing facility along with related 24 infrastructure improvements 2,000,000 <-- 25 (Base Project Allocation - $2,000,000) 26 INFRASTRUCTURE IMPROVEMENTS 2,500,000 <-- 27 (BASE PROJECT ALLOCATION - $2,500,000) 28 (iv) State Correctional Institution at 29 Houtzdale 30 (A) Lease and/or purchase an emergency 20070H1589B3496 - 275 -
1 housing facility along with related 2 infrastructure improvements 2,000,000 <-- 3 (Base Project Allocation - $2,000,000) 4 INFRASTRUCTURE IMPROVEMENTS 2,500,000 <-- 5 (BASE PROJECT ALLOCATION - $2,500,000) 6 (v) State Correctional Institution at Laurel 7 Highlands 8 (A) Lease and/or purchase two separate 9 emergency housing facilities along with 10 related infrastructure improvements 4,000,000 11 (Base Project Allocation - $4,000,000) 12 (vi) State Correctional Institution at Mahanoy 13 (A) Lease and/or purchase an emergency 14 housing facility along with related 15 infrastructure improvements 2,000,000 <-- 16 (Base Project Allocation - $2,000,000) 17 INFRASTRUCTURE IMPROVEMENTS 2,500,000 <-- 18 (BASE PROJECT ALLOCATION - $2,500,000) 19 (vii) State Correctional Institution at Muncy 20 (A) Lease and/or purchase two separate 21 emergency housing facilities along with 22 related infrastructure improvements 4,000,000 23 (Base Project Allocation - $4,000,000) 24 (viii) State Correctional Institution at Pine 25 Grove 26 (A) Lease and/or purchase an emergency 27 housing facility along with related 28 infrastructure improvements 2,000,000 <-- 29 (Base Project Allocation - $2,000,000) 30 INFRASTRUCTURE IMPROVEMENTS 2,500,000 <-- 20070H1589B3496 - 276 -
1 (BASE PROJECT ALLOCATION - $2,500,000) 2 (ix) State Correctional Institution at Retreat 3 (A) Lease and/or purchase an emergency 4 housing facility along with related 5 infrastructure improvements 3,500,000 6 (Base Project Allocation - $3,500,000) 7 (x) State Correctional Institution at Rockview 8 (A) Lease and/or purchase an emergency 9 housing facility along with related 10 infrastructure improvements 2,000,000 <-- 11 (Base Project Allocation - $2,000,000) 12 INFRASTRUCTURE IMPROVEMENTS 2,500,000 <-- 13 (BASE PROJECT ALLOCATION - $2,500,000) 14 (2) Pennsylvania Historical and Museum Commission 15 (i) Pennsylvania Military Museum 16 (A) Design and construct a 2,500-square- 17 foot storage building for historical 18 military vehicles 600,000 19 (Base Project Allocation - $500,000) 20 (Design and Contingencies - $100,000) 21 Section 11.1. Itemization of Manufacturing Fund Current Revenue <-- 22 Projects CURRENT REVENUE PROJECTS. <-- 23 (a) Public improvement projects.--The individual capital 24 projects in the category of public improvement projects to be 25 developed by the Department of General Services, its successors 26 or assigns, for the Department of Corrections and to be financed 27 from current revenues of the Manufacturing Fund are hereby 28 itemized together with their respective itemized costs as 29 follows: 30 Total 20070H1589B3496 - 277 -
1 Project 2 Project Allocation 3 (1) Department of Corrections 4 (i) State Correctional Institution at 5 Frackville 6 (A) Modify an existing building into a 7 regional laundry facility for 8 correctional industries including 9 laundry equipment 3,000,000 10 (Base Project Allocation - $3,000,000) 11 SECTION 11.2. ITEMIZATION OF PENNSYLVANIA FISH AND BOAT <-- 12 COMMISSION CAPITAL PROJECTS. 13 THE INDIVIDUAL CAPITAL PROJECTS IN THE CATEGORY OF PUBLIC 14 IMPROVEMENTS PROJECTS TO BE ACQUIRED OR DEVELOPED BY THE 15 PENNSYLVANIA FISH AND BOAT COMMISSION AND TO BE FINANCED BY THE 16 INCURRING OF DEBT OR BY THE CURRENT REVENUES OF THE FISH FUND 17 AND THE BOAT FUND PURSUANT TO EXECUTIVE AUTHORIZATIONS ARE 18 HEREBY ITEMIZED TOGETHER WITH THEIR RESPECTIVE ESTIMATED COSTS, 19 AS FOLLOWS: TOTAL 20 PROJECT 21 PROJECT ALLOCATION 22 (1) PENNSYLVANIA FISH AND BOAT COMMISSION 23 (I) BEDFORD COUNTY <-- 24 (A) DESIGN, REHABILITATE AND CONSTRUCT 25 FISH REARING FACILITIES AND RELATED 26 INFRASTRUCTURE, REYNOLDSDALE STATE FISH 27 HATCHERY 9,300,000 28 (I.1) BUTLER COUNTY <-- 29 (A) DESIGN AND CONSTRUCT A NEW DAM 30 ACCORDING TO CURRENT STANDARDS OR 20070H1589B3496 - 278 -
1 RENOVATE, RECONSTRUCT OR DEMOLISH 2 EXISTING DAM, GLADE RUN 4,500,000 3 (II) CENTRE COUNTY 4 (A) DESIGN, REPLACE OR REMODEL PLEASANT 5 GAP HEADQUARTERS 6,500,000 6 (III) CUMBERLAND COUNTY 7 (A) DESIGN AND CONSTRUCT A NEW DAM 8 ACCORDING TO CURRENT STANDARDS, OPOSSUM 9 LAKE 4,600,000 10 (B) DESIGN AND CONSTRUCT A NEW DAM <-- 11 ACCORDING TO CURRENT STANDARDS OR 12 RENOVATE, RECONSTRUCT OR DEMOLISH 13 EXISTING DAM, OPOSSUM LAKE 4,000,000 14 (IV) DAUPHIN COUNTY 15 (A) PROVIDE ADDITIONAL OFFICE SPACE AND 16 WORK AREAS FOR ADMINISTRATIVE AND 17 TECHNICAL NEEDS AND ALSO FOR PARTNERS 18 RELATED TO THE COMMISSION'S MISSION, 19 HARRISBURG HEADQUARTERS 1,200,000 20 (V) FAYETTE COUNTY <-- 21 (A) DESIGN AND CONSTRUCT A NEW DAM 22 ACCORDING TO CURRENT STANDARDS OR 23 RENOVATE, RECONSTRUCT OR DEMOLISH 24 EXISTING DAM, VIRGIN RUN LAKE 5,000,000 25 (VI) JEFFERSON COUNTY 26 (A) DESIGN AND CONSTRUCT A NEW DAM 27 ACCORDING TO CURRENT STANDARDS OR 28 RENOVATE, RECONSTRUCT OR DEMOLISH 29 EXISTING DAM, KYLE LAKE 5,000,000 30 (VII) LANCASTER COUNTY 20070H1589B3496 - 279 -
1 (A) DESIGN AND CONSTRUCT A NEW DAM 2 ACCORDING TO CURRENT STANDARDS OR 3 RENOVATE, RECONSTRUCT OR DEMOLISH 4 EXISTING DAM, SPEEDWELL FORGE LAKE 5,500,000 5 (VIII) NORTHAMPTON COUNTY 6 (A) DESIGN AND CONSTRUCT A NEW DAM 7 ACCORDING TO CURRENT STANDARDS OR 8 RENOVATE, RECONSTRUCT OR DEMOLISH 9 EXISTING DAM, MINSI LAKE 3,500,000 10 (IX) SOMERSET COUNTY 11 (A) DESIGN AND CONSTRUCT A NEW DAM 12 ACCORDING TO CURRENT STANDARDS OR 13 RENOVATE, RECONSTRUCT OR DEMOLISH 14 EXISTING DAM, LAKE SOMERSET 3,500,000 15 (X) TIOGA COUNTY 16 (A) DESIGN AND CONSTRUCT A NEW DAM 17 ACCORDING TO CURRENT STANDARDS OR 18 RENOVATE, RECONSTRUCT OR DEMOLISH 19 EXISTING DAM, LAKE NESSMUK 1,500,000 20 (I) (V) (XI) WASHINGTON COUNTY <-- 21 (A) REHABILITATION AND REPAIRS, INCLUDING 22 INFRASTRUCTURE IMPROVEMENTS, DUTCH FORK 23 LAKE DAM 9,000,000 24 Section 11.2. 11.3 Limited waiver of local requirements. <-- 25 The limitation on Department of Transportation funding of 26 capital projects under 74 Pa.C.S. § 1302(4) (relating to program 27 authorizations) shall be totally waived for the capital projects 28 in the category of transportation assistance projects for mass 29 transit contained in section 5(a)(7.1)(iv) 5(A)(7.2)(IV) and <-- 30 (v). 20070H1589B3496 - 280 -
1 (B) DESIGN AND CONSTRUCT A NEW DAM <-- 2 ACCORDING TO CURRENT STANDARDS OR 3 RENOVATE, RECONSTRUCT OR DEMOLISH 4 EXISTING DAM, CANONSBURG LAKE 6,500,000 5 (XII) WAYNE COUNTY 6 (A) DESIGN AND CONSTRUCT A NEW DAM 7 ACCORDING TO CURRENT STANDARDS OR 8 RENOVATE, RECONSTRUCT OR DEMOLISH 9 EXISTING DAM, LOWER WOODS POND LAKE 1,500,000 10 (B) DESIGN AND CONSTRUCT A NEW DAM 11 ACCORDING TO CURRENT STANDARDS OR 12 RENOVATE, RECONSTRUCT OR DEMOLISH 13 EXISTING DAM, BELMONT LAKE 1,500,000 14 (XIII) WESTMORELAND COUNTY 15 (A) DESIGN AND CONSTRUCT A NEW DAM 16 ACCORDING TO CURRENT STANDARDS OR 17 RENOVATE, RECONSTRUCT OR DEMOLISH 18 EXISTING DAM, DONEGAL LAKE 4,500,000 19 (XIV) WYOMING COUNTY 20 (A) DESIGN AND CONSTRUCT A NEW DAM 21 ACCORDING TO CURRENT STANDARDS OR 22 RENOVATE, RECONSTRUCT OR DEMOLISH 23 EXISTING DAM, STEVENS LAKE 2,000,000 24 SECTION 11.3. ITEMIZATION OF MOTOR LICENSE FUND PROJECTS. <-- 25 THE INDIVIDUAL CAPITAL PROJECTS IN THE CATEGORY OF PUBLIC 26 IMPROVEMENT PROJECTS TO BE DEVELOPED BY THE DEPARTMENT OF 27 GENERAL SERVICES, ITS SUCCESSORS OR ASSIGNS, FOR THE DEPARTMENT 28 OF TRANSPORTATION, AND TO BE FINANCED BY THE INCURRING OF DEBT 29 OR FROM CURRENT REVENUES IN THE MOTOR LICENSE FUND ARE HEREBY 30 ITEMIZED TOGETHER WITH THEIR RESPECTIVE ITEMIZED COSTS AS 20070H1589B3496 - 281 -
1 FOLLOWS: TOTAL 2 PROJECT 3 PROJECT ALLOCATION 4 (1) DEPARTMENT OF TRANSPORTATION 5 (I) ARMSTRONG COUNTY 6 (A) RENOVATE THE MAINTENANCE GARAGE, 7 DISTRICT 10-1 440,000 8 (B) CONSTRUCT WELD SHOP ADDITION, DISTRICT 9 10-1 385,000 10 (II) BEDFORD COUNTY 11 (A) INSTALL NEW BEDFORD COUNTY GARAGE HVAC 12 SYSTEM 850,000 13 (III) BUTLER COUNTY 14 (A) REPLACE BOILERS AND INSTALL INFRARED 15 HEAT, DISTRICT 10-2 600,000 16 (B) INSTALL NEW HVAC SYSTEM, DISTRICT 102 715,000 17 (C) REPLACE ROOF, DISTRICT 10-2 385,000 18 (D) REPAIR STRUCTURAL DAMAGE, DISTRICT 10- 19 2 495,000 20 (IV) CARBON COUNTY 21 (A) CONSTRUCT NEW VEHICLE WASH BAY 550,000 22 (B) RENOVATE METAL BUILDING 360,000 23 (V) CENTRE COUNTY 24 (A) CONSTRUCT NEW VEHICLE WASH BAY 550,000 25 (VI) CLARION COUNTY 26 (A) CONSTRUCT AND REPAIR NEW WEIGH 27 STATION, DISTRICT 10-3 375,000 28 (VII) COLUMBIA COUNTY 29 (A) CONSTRUCT WELD SHOP ADDITION, DISTRICT 30 3-1 412,000 20070H1589B3496 - 282 -
1 (VIII) CRAWFORD COUNTY 2 (A) CONSTRUCT NEW VEHICLE WASH BAY 550,000 3 (IX) CUMBERLAND COUNTY 4 (A) CONSTRUCT NEW VEHICLE WASH BAY 550,000 5 (X) DELAWARE COUNTY 6 (A) CONSTRUCT NEW VEHICLE WASH BAY 550,000 7 (XI) ERIE COUNTY 8 (A) CONSTRUCT NEW VEHICLE WASH BAY 550,000 9 (XII) INDIANA COUNTY 10 (A) CONSTRUCT NEW VEHICLE WASH BAY 550,000 11 (B) CONSTRUCT TRAINING AND EMERGENCY 12 OPERATION CENTER, DISTRICT 10-0 850,000 13 (C) INSTALL NEW HVAC SYSTEM, DISTRICT 10- 14 0 440,000 15 (D) INSTALL NEW HVAC SYSTEM, DISTRICT 10- 16 4 577,000 17 (XIII) JEFFERSON COUNTY 18 (A) CONSTRUCT NEW VEHICLE WASH BAY 550,000 19 (XIV) JUNIATA COUNTY 20 (A) RENOVATE FRONT OFFICE, RESTROOM AND 21 HVAC SYSTEM AND UPGRADE WELD SHOP, 22 DISTRICT 2-9 450,000 23 (XV) LACKAWANNA COUNTY 24 (A) CONSTRUCT NEW VEHICLE WASH BAY 550,000 25 (B) RENOVATE OFFICE, DISTRICT 4-0 715,000 26 (C) REPLACE ROOF, LACKAWANNA COUNTY 27 GARAGE 633,000 28 (D) RENOVATE AND EXPAND PARKING LOT AND 29 RAMPS, RSR SITE 55 660,000 30 (XVI) LANCASTER COUNTY 20070H1589B3496 - 283 -
1 (A) CONSTRUCT NEW VEHICLE WASH BAY 550,000 2 (XVII) MCKEAN COUNTY 3 (A) RENOVATE FRONT OFFICE AND RESTROOM AND 4 UPGRADE HVAC, DISTRICT 2-5 300,000 5 (XVIII) MONROE COUNTY 6 (A) CONSTRUCT NEW VEHICLE WASH BAY 550,000 7 (B) REPLACE ROOF ON MONROE COUNTY GARAGE 550,000 8 (XIX) MONTGOMERY COUNTY 9 (A) REPAIR GARAGE PARKING DECK, DISTRICT 10 6-0 ENGINEERING OFFICE 500,000 11 (B) REPLACE HVAC PIPING, DISTRICT 6-0 12 ENGINEERING OFFICE 300,000 13 (C) CONSTRUCT NEW VEHICLE WASH BAY 550,000 14 (D) INSTALL NEW GENERATOR, DISTRICT 6-0 15 OFFICE 412,000 16 (XX) NORTHUMBERLAND COUNTY 17 (A) CONSTRUCT PREVENTATIVE MAINTENANCE 18 BAY, DISTRICT 3-4 500,000 19 (B) CONSTRUCT NEW PREVENTATIVE MAINTENANCE 20 BAY, DISTRICT 3-4 660,000 21 (XXI) PERRY COUNTY 22 (A) CONSTRUCT NEW VEHICLE WASH BAY 550,000 23 (XXII) PHILADELPHIA COUNTY 24 (A) CONSTRUCT NEW VEHICLE WASH BAY 550,000 25 (XXIII) SNYDER COUNTY 26 (A) DEMOLISH PORTION OF OLD GARAGE AND 27 CONSTRUCT BRIDGE BEAM SHOP, DISTRICT 3- 28 5 400,000 29 (XXIV) SUSQUEHANNA COUNTY 30 (A) CONSTRUCT NEW VEHICLE WASH BAY 550,000 20070H1589B3496 - 284 -
1 (XXV) VENANGO COUNTY 2 (A) INSTALL NEW HVAC SYSTEM, DISTRICT 1-0 770,000 3 (XXVI) WYOMING COUNTY 4 (A) MAKE RENOVATIONS AND INSTALL NEW HVAC 5 SYSTEM, DISTRICT 4-7 660,000 6 (XXVII) YORK COUNTY 7 (A) CONSTRUCT NEW HI-ARCH SALT STORAGE AND 8 ADDITIONAL BUILDINGS 550,000 9 (B) REPAIR FLOOR AND REPAIR OR REPLACE 10 HVAC SYSTEM, YORK COUNTY GARAGE 950,000 11 Section 12. Debt authorization. 12 (a) Public improvements.--The Governor, Auditor General and 13 State Treasurer are hereby authorized and directed to borrow 14 from time to time in addition to any authorization heretofore or 15 hereafter enacted, on the credit of the Commonwealth, subject to 16 the limitations provided in the current capital budget, money 17 not exceeding in the aggregate the sum of $1,548,730,000 <-- 18 $3,723,177,000 $4,479,227,000 $5,120,432,000 as may be found <-- 19 necessary to carry out the acquisition and construction of the 20 public improvement projects specifically itemized in a capital 21 budget. 22 (b) Furniture and equipment.--The Governor, Auditor General 23 and State Treasurer are hereby authorized and directed to borrow 24 from time to time in addition to any authorization heretofore or 25 hereafter enacted, on the credit of the Commonwealth, subject to 26 the limitations provided in the current capital budget, money 27 not exceeding in the aggregate the sum of $81,846,000 <-- 28 $136,346,000 $149,846,000 $166,346,000 as may be found necessary <-- 29 to carry out the acquisition and construction of the public 30 improvement projects consisting of the acquisition of original 20070H1589B3496 - 285 -
1 movable furniture and equipment specifically itemized in a 2 capital budget. 3 (c) Transportation assistance.--The Governor, Auditor 4 General and State Treasurer are hereby authorized and directed 5 to borrow from time to time in addition to any authorization 6 heretofore or hereafter enacted, on the credit of the 7 Commonwealth, subject to the limitations provided in the current 8 capital budget, money not exceeding in the aggregate the sum of 9 $428,978,000 $671,739,000 $695,639,000 $750,939,000 as may be <-- 10 found necessary to carry out the acquisition and construction of 11 the transportation assistance projects specifically itemized in 12 a capital budget. 13 (d) Redevelopment assistance.--Subject to the limitation in 14 section 317(b) of the act of February 9, 1999 (P.L.1, No.1), 15 known as the Capital Facilities Debt Enabling Act, the Governor, 16 Auditor General and State Treasurer are hereby authorized and 17 directed to borrow from time to time in addition to any 18 authorization heretofore or hereafter enacted, on the credit of 19 the Commonwealth, subject to the limitations provided in the 20 current capital budget, money not exceeding in the aggregate the 21 sum of $1,847,616,000 $4,497,578,000 $4,852,177,000 <-- 22 $6,482,798,000 as may be found necessary to carry out the <-- 23 redevelopment assistance and the redevelopment assistance 24 capital projects specifically itemized in a capital budget. 25 (e) Flood control.--The Governor, Auditor General and State 26 Treasurer are hereby authorized and directed to borrow from time 27 to time in addition to any authorization heretofore or hereafter 28 enacted, on the credit of the Commonwealth, subject to the 29 limitations provided in the current capital budget, money not 30 exceeding in the aggregate the sum of $21,726,000 $39,226,000 <-- 20070H1589B3496 - 286 -
1 $74,526,000 as may be found necessary to carry out the <--
2 acquisition and construction of the flood control projects
3 specifically itemized in a capital budget.
4 (F) PENNSYLVANIA FISH AND BOAT COMMISSION PROJECTS.--THE <--
5 GOVERNOR, AUDITOR GENERAL AND STATE TREASURER ARE HEREBY
6 AUTHORIZED AND DIRECTED TO BORROW FROM TIME TO TIME IN ADDITION
7 TO ANY AUTHORIZATION HERETOFORE OR HEREAFTER ENACTED, ON THE
8 CREDIT OF THE COMMONWEALTH, SUBJECT TO THE LIMITATIONS PROVIDED
9 IN THE CURRENT CAPITAL BUDGET, MONEY NOT EXCEEDING IN THE
10 AGGREGATE SUM OF $9,000,000 $30,600,000 $79,100,000 AS MAY BE <--
11 FOUND NECESSARY TO CARRY OUT THE ACQUISITION AND CONSTRUCTION OF
12 THE PENNSYLVANIA FISH AND BOAT COMMISSION PROJECTS SPECIFICALLY
13 ITEMIZED IN THIS CAPITAL BUDGET.
14 (G) MOTOR LICENSE FUND PROJECTS.--THE GOVERNOR, AUDITOR <--
15 GENERAL AND STATE TREASURER ARE HEREBY AUTHORIZED AND DIRECTED
16 TO BORROW FROM TIME TO TIME IN ADDITION TO ANY AUTHORIZATION
17 HERETOFORE OR HEREAFTER ENACTED, ON THE CREDIT OF THE
18 COMMONWEALTH, SUBJECT TO THE LIMITATIONS PROVIDED IN THE CURRENT
19 CAPITAL BUDGET, MONEY NOT EXCEEDING IN THE AGGREGATE THE SUM OF
20 $24,144,000 AS MAY BE FOUND NECESSARY TO CARRY OUT THE
21 ACQUISITION AND CONSTRUCTION OF THE MOTOR LICENSE FUND PROJECTS
22 SPECIFICALLY ITEMIZED IN A CAPITAL BUDGET.
23 Section 13. Issue of bonds.
24 The indebtedness authorized in this act shall be incurred
25 from time to time and shall be evidenced by one or more series
26 of general obligation bonds of the Commonwealth in such
27 aggregate principal amount for each series as the Governor, the
28 Auditor General and the State Treasurer shall determine, but the
29 latest stated maturity date shall not exceed the estimated
30 useful life of the projects being financed as stated in section
20070H1589B3496 - 287 -
1 15 14. <-- 2 Section 14. Estimated useful life and term of debt. 3 (a) Estimated useful life.--The General Assembly states that 4 the estimated useful life of the public improvement projects 5 itemized in this act is as follows: 6 (1) Public improvement projects, 30 years. 7 (2) Furniture and equipment projects, 10 years. 8 (3) Transportation assistance projects: 9 (i) Rolling stock, 15 years. 10 (ii) Passenger buses, 12 years. 11 (iii) Furniture and equipment, 10 years. 12 (iv) All others, 30 years. 13 (b) Term of debt.--The maximum term of the debt authorized 14 to be incurred under this act is 30 years. 15 Section 15. Appropriations. 16 (a) Public improvements.--The net proceeds of the sale of 17 the obligations authorized in this act are hereby appropriated 18 from the Capital Facilities Fund to the Department of General 19 Services in the maximum amount of $1,548,730,000 $3,723,177,000 <-- 20 $4,479,227,000 $5,120,432,000 to be used by it exclusively to <-- 21 defray the financial cost of the public improvement projects 22 specifically itemized in a capital budget. After reserving or 23 paying the expenses of the sale of the obligation, the State 24 Treasurer shall pay to the Department of General Services the 25 moneys as required and certified by it to be legally due and 26 payable. 27 (b) Furniture and equipment.--The net proceeds of the sale 28 of the obligations authorized in this act are hereby 29 appropriated from the Capital Facilities Fund to the Department 30 of General Services in the maximum amount of $81,846,000 <-- 20070H1589B3496 - 288 -
1 $136,346,000 $149,846,000 $166,346,000 to be used by it <-- 2 exclusively to defray the financial cost of the public 3 improvement projects consisting of the acquisition of original 4 movable furniture and equipment specifically itemized in a 5 capital budget. After reserving or paying the expenses of the 6 sale of the obligation, the State Treasurer shall pay to the 7 Department of General Services the moneys as required and 8 certified by it to be legally due and payable. 9 (c) Transportation assistance.--The net proceeds of the sale 10 of the obligations authorized in this act are hereby 11 appropriated from the Capital Facilities Fund to the Department 12 of Transportation in the maximum amount of $428,978,000 <-- 13 $671,739,000 $695,639,000 $750,939,000 to be used by it <-- 14 exclusively to defray the financial cost of the transportation 15 assistance projects specifically itemized in a capital budget. 16 After reserving or paying the expenses of the sale of the 17 obligation, the State Treasurer shall pay to the Department of 18 Transportation the moneys as required and certified by it to be 19 legally due and payable. 20 (d) Redevelopment assistance.--The net proceeds of the sale 21 of the obligations authorized in this act are hereby 22 appropriated from the Capital Facilities Fund to the Department 23 of Community and Economic Development in the maximum amount of 24 $1,847,616,000 $4,497,578,000 $4,852,177,000 $6,482,798,000 to <-- 25 be used by it exclusively to defray the financial cost of the <-- 26 redevelopment assistance and redevelopment assistance capital 27 projects specifically itemized in a capital budget. After 28 reserving or paying the expenses of the sale of the obligation, 29 the State Treasurer shall pay to the Department of Community and 30 Economic Development the moneys as required and certified by it 20070H1589B3496 - 289 -
1 to be legally due and payable. 2 (e) Flood control.--The net proceeds of the sale of the 3 obligations authorized in this act are hereby appropriated from 4 the Capital Facilities Fund to the Department of Environmental 5 Protection in the maximum amount of $21,726,000 $39,226,000 <-- 6 $74,526,000 to be used by it exclusively to defray the financial <-- 7 cost of the flood control projects specifically itemized in a 8 capital budget. After reserving or paying the expenses of the 9 sale of the obligation, the State Treasurer shall pay to the 10 Department of Environmental Protection the moneys as required 11 and certified by it to be legally due and payable. 12 (F) PENNSYLVANIA FISH AND BOAT COMMISSION PROJECTS.--THE NET <-- 13 PROCEEDS OF THE SALE OF THE OBLIGATIONS AUTHORIZED IN THIS ACT 14 ARE HEREBY APPROPRIATED FROM THE CAPITAL FACILITIES FUND TO THE 15 PENNSYLVANIA FISH AND BOAT COMMISSION IN THE MAXIMUM AMOUNT OF 16 $9,000,000 $30,600,000 $79,100,000 TO BE USED BY IT EXCLUSIVELY <-- 17 TO DEFRAY THE FINANCIAL COST OF THE PENNSYLVANIA FISH AND BOAT 18 COMMISSION PROJECTS SPECIFICALLY ITEMIZED IN A CAPITAL BUDGET. 19 AFTER RESERVING OR PAYING THE EXPENSE OF THE SALE OF THE 20 OBLIGATION, THE STATE TREASURER SHALL PAY TO THE PENNSYLVANIA 21 FISH AND BOAT COMMISSION THE MONEYS AS REQUIRED AND CERTIFIED BY 22 IT TO BE LEGALLY DUE AND PAYABLE. 23 (G) MOTOR LICENSE FUND PROJECTS.--THE NET PROCEEDS OF THE <-- 24 SALE OF THE OBLIGATIONS AUTHORIZED IN THIS ACT ARE HEREBY 25 APPROPRIATED FROM THE MOTOR LICENSE FUND TO THE DEPARTMENT OF 26 TRANSPORTATION IN THE MAXIMUM AMOUNT OF $24,144,000 TO BE USED 27 BY IT EXCLUSIVELY TO DEFRAY THE FINANCIAL COST OF THE MOTOR 28 LICENSE FUND PROJECTS SPECIFICALLY ITEMIZED IN A CAPITAL BUDGET. 29 AFTER RESERVING OR PAYING THE EXPENSE OF THE SALE OF THE 30 OBLIGATION, THE STATE TREASURER SHALL PAY TO THE DEPARTMENT OF 20070H1589B3496 - 290 -
1 TRANSPORTATION THE MONEYS AS REQUIRED AND CERTIFIED BY IT TO BE 2 LEGALLY DUE AND PAYABLE. 3 Section 16. Federal funds. 4 In addition to those funds appropriated in section 15, all 5 moneys received from the Federal Government for the projects 6 specifically itemized in this act are also hereby appropriated 7 for those projects. 8 Section 17. Delegation. 9 Notwithstanding any provision of law to the contrary, the <-- 10 (1) NOTWITHSTANDING ANY PROVISION OF LAW TO THE <-- 11 CONTRARY, THE Department of General Services may delegate the 12 design and construction of the project contained in section 13 3(9)(iv)(A) 3(9)(IX)(A) to Drexel University. <-- 14 (2) FOR THE PUBLIC IMPROVEMENT PROJECTS SPECIFICALLY <-- 15 ITEMIZED IN SECTION 3(14), THE DEPARTMENT OF GENERAL SERVICES 16 MAY DELEGATE THE AUTHORITY TO CONSTRUCT, IMPROVE, EQUIP, 17 FURNISH, MAINTAIN, ACQUIRE OR OPERATE SUCH PROJECTS TO THE 18 PHILADELPHIA REGIONAL PORT AUTHORITY. NOTWITHSTANDING ANY 19 PROVISION OF LAW TO THE CONTRARY, THE PHILADELPHIA REGIONAL 20 PORT AUTHORITY, AT ITS DISCRETION AND SUBSEQUENT TO THE 21 AFOREMENTIONED DELEGATION, MAY CONTRACT WITH ONE OR MORE OF 22 THE TENANT COMPANIES LEASING OR OPERATING PORT FACILITIES AT 23 THE PORT OF PHILADELPHIA FOR THE PURPOSE OF CONSTRUCTING, 24 IMPROVING, EQUIPPING, FURNISHING, MAINTAINING, ACQUIRING OR 25 OPERATING THE PUBLIC IMPROVEMENT PROJECTS SPECIFICALLY 26 ITEMIZED IN SECTION 3(14). ANY PROJECT ITEMIZED IN SECTION 27 3(14) DELEGATED TO THE PHILADELPHIA REGIONAL PORT AUTHORITY 28 FOR WHICH THE AUTHORITY CONTRACTS WITH A TENANT COMPANY FOR 29 THE PURPOSE OF CONSTRUCTING, IMPROVING, EQUIPPING, 30 FURNISHING, MAINTAINING, ACQUIRING OR OPERATING THE PROJECT 20070H1589B3496 - 291 -
1 SHALL BE EXEMPT FROM THE FIRST PARAGRAPH OF SECTION 1 OF THE 2 ACT OF MAY 1, 1913 (P.L.155, NO.104), REFERRED TO AS THE 3 SEPARATIONS ACT, AND THE PROVISIONS OF THE ACT OF MARCH 3, 4 1978 (P.L.6, NO.3), KNOWN AS THE STEEL PRODUCTS PROCUREMENT 5 ACT, AND ANY PROVISIONS OF THE LAW REQUIRING THE BIDDING OF 6 PROJECTS. 7 Section 18. Department of Corrections facilities. 8 (a) Preemption of local ordinances.--Capital projects in the 9 category of public improvement projects specifically itemized 10 for the Department of Corrections in section 3(4)(i), (iii), 11 (vi), (ix), (x)(B), (xi)(B), (xii)(B), (xiii), (xiv) and (xv)(B) <-- 12 (VI), (VIII), (IX), (X)(B), (XI)(B), (XII)(B), (XIII), (XIV), <-- 13 (XV)(B), (XVI) AND (XVIII) (XIX) AND SECTION 11(1) of this act <-- 14 are hereby authorized to be constructed, erected or acquired by 15 the Department of General Services, its successors or assigns, 16 of the Department of Corrections, notwithstanding any zoning 17 ordinance, land use ordinance, building code or other regulation 18 adopted or enacted by a political subdivision under the 19 authority of any statute or under the authority of any home rule 20 charter authorized and adopted under any statute or the 21 Constitution of Pennsylvania. 22 (b) Preemption of local ordinances for 2005-2006 projects.-- 23 Capital projects in the category of public improvement projects 24 specifically itemized for the Department of Corrections in 25 section 3(5)(iv.2)(A), (iv.4)(A) and (v.1)(A) of the act of July 26 7, 2006 (P.L.390, No.83), known as the Capital Budget Project 27 Itemization Act of 2005-2006, are hereby authorized to be 28 constructed, erected or acquired by the Department of General 29 Services, its successors or assigns, of the Department of 30 Corrections, notwithstanding any zoning ordinance, land use 20070H1589B3496 - 292 -
1 ordinance, building code or other regulation adopted or enacted 2 by a political subdivision under the authority of any statute or 3 under the authority of any home rule charter authorized and 4 adopted under any statute or the Constitution of Pennsylvania. 5 (c) Preemption of local ordinances for 2001-2002 projects.-- 6 The capital projects in the category of public improvement 7 projects specifically itemized for the Department of Corrections 8 in section 3(4)(xi)(A) of the act of October 30, 2002 (P.L.891, 9 No.131), known as the Capital Budget Project Itemization Act of 10 2001-2002, are hereby authorized to be constructed, erected or 11 acquired by the Department of General Services, its successors 12 or assigns, of the Department of Corrections, notwithstanding 13 any zoning ordinance, land use ordinance, building code or other 14 regulation adopted or enacted by a political subdivision under 15 the authority of any statute or under the authority of any home 16 rule charter authorized and adopted under any statute or the 17 Constitution of Pennsylvania. 18 Section 19. Special contract provisions for Department of 19 Corrections projects. 20 The Department of General Services shall use the competitive 21 sealed proposal method of source selection to enter into a 22 design/build contract for the projects which are authorized in 23 section 3(4)(i), (iii), (vi), (viii), (ix), (x)(B), (xi)(B), 24 (xii)(B), (xiii), (xiv), (xv), (XVI) AND (XVIII) (XVI) AND (XIX) <-- 25 and section 7(1) 11(1). Notwithstanding the provisions of 62 <-- 26 Pa.C.S. § 322(6) (relating to specific construction powers, 27 duties and procedures), the Department of General Services, upon <-- 28 approval of the Secretary of the Budget, may SHALL comply with <-- 29 the provisions of the act of May 1, 1913 (P.L.155, No.104), 30 referred to as the Separations Act, by entering into a 20070H1589B3496 - 293 -
1 design/build contract which requires that the design/build 2 contractor comply with the requirements of the Separations Act. 3 Any Department of Corrections project which is authorized in <-- 4 section 3(4)(i), (iii), (vi), (viii), (ix), (x)(B), (xi)(B), 5 (xii)(B), (xiii), (xiv), (xv) or section 7(1) shall be exempt 6 from the provisions of the act of March 3, 1978 (P.L.6, No.3), 7 known as the Steel Products Procurement Act. The Secretary of 8 the Budget shall give notification of any such design/build 9 contracts to the chairman and minority chairman of the 10 Appropriations Committee of the Senate and the chairman and 11 minority chairman of the Appropriations Committee of the House 12 of Representatives ten days prior to advertising for a 13 developer. Any Department of Corrections public improvement <-- 14 project-eligible expenditure of funds incurred prior to the 15 effective date of this act which is directly related to a 16 project PUBLIC improvement capital project itemized in section <-- 17 3(4)(i), (iii), (vi), (viii), (ix), (x)(B), (xi)(B), (xii)(B), 18 (xiii), (xiv), (xv) or section 7(1), (XVI), (XIX) OR SECTION <-- 19 11(1) shall be considered eligible to be utilized as a portion 20 of the expenditure of funds and may be considered as eligible 21 for reimbursement from capital funds for a project PUBLIC <-- 22 improvement capital project itemized in section 3(4)(i), (iii), 23 (vi), (viii), (ix), (x)(B), (xi)(B), (xii)(B), (xiii), (xiv), 24 (xv), (XVI) AND (XVIII) or section 7(1) (XIX) OR SECTION 11(1). <-- 25 Section 20. Special contract provisions for Department of 26 Conservation and Natural Resources projects. 27 Any Department of Conservation and Natural Resources public 28 improvement project-eligible expenditure of funds incurred prior 29 to the effective date of this act which is directly related to a 30 project PUBLIC improvement capital project itemized in section <-- 20070H1589B3496 - 294 -
1 3(3)(xxi) shall be considered eligible to be utilized as a 2 portion of the expenditure of funds and may be considered as 3 eligible for reimbursement from capital funds for a project <-- 4 PUBLIC improvement capital project itemized in section <-- 5 3(3)(xxi). 6 SECTION 21. DEPARTMENT OF GENERAL SERVICES AUTHORIZATION. <-- 7 THE DEPARTMENT OF GENERAL SERVICES IS AUTHORIZED, SUBJECT TO <-- 8 (1) THE DEPARTMENT OF GENERAL SERVICES IS AUTHORIZED, <-- 9 SUBJECT TO EXECUTIVE APPROVAL AND AUTHORIZATION, TO CONSTRUCT 10 THE FAMILY COURT BUILDING ITEMIZED IN SECTION 3(7)(IV)(E) BY 11 CONTRACT AWARDED BY THE DEPARTMENT OF GENERAL SERVICES OR TO 12 ACQUIRE THE FAMILY COURT BUILDING BY MEANS OF A LEASE WITH AN 13 OPTION TO PURCHASE. 14 SECTION 22. PRECONDITION ON AIRPORT PROJECT. <-- 15 NO AMOUNTS ALLOCATED TO THE PROJECT DESCRIBED IN SECTIONS 16 5(C)(4)(I)(A) AND 6(40)(VI)(A) SHALL BE PAID OR OTHERWISE 17 RELEASED UNTIL THE FOLLOWING CONDITIONS HAVE BEEN MET: 18 (1) THE PROJECT HAS BEEN APPROVED BY THE FEDERAL 19 AVIATION ADMINISTRATION AND THE BUREAU OF AVIATION IN THE 20 PENNSYLVANIA DEPARTMENT OF TRANSPORTATION. 21 (2) THAT THE REPORT SUBMITTED BY THE LEGISLATIVE BUDGET 22 AND FINANCE COMMITTEE PURSUANT TO SENATE RESOLUTION 144 OF 23 2007 RECOMMENDS THE CONSTRUCTION OF THE AIRPORT IN THE 24 CONCLUSIONS CONTAINED IN THE FINAL REPORT OF THE COMMITTEE. 25 (3) THAT NO OTHER FUNDS DERIVED BY THE COMMONWEALTH OR A 26 POLITICAL SUBDIVISION UNDER 4 PA.C.S. (RELATING TO 27 AMUSEMENTS) SHALL BE UTILIZED FOR THE PROJECT. 28 (4) NO MONEY ALLOCATED TO THE PROJECT DESCRIBED IN 29 SECTIONS 5(C)(4)(I)(A) AND 6(40)(VI)(A) SHALL BE APPROVED FOR 30 RELEASE UNTIL THE DEPARTMENT OF COMMUNITY AND ECONOMIC 20070H1589B3496 - 295 -
1 DEVELOPMENT CERTIFIES THAT THE PROJECT HAS AT LEAST A 50% 2 NONPUBLIC, PRIVATE EQUITY PARTICIPATION DOCUMENTATION AT THE 3 TIME OF APPLICATION. 4 SECTION 23 22. DEPARTMENT OF GENERAL SERVICES AUTHORIZATION. <-- 5 THE DEPARTMENT OF GENERAL SERVICES IS AUTHORIZED, SUBJECT TO 6 (2) THE DEPARTMENT OF GENERAL SERVICES IS AUTHORIZED, <-- 7 SUBJECT TO EXECUTIVE APPROVAL AND AUTHORIZATION, TO CONSTRUCT 8 A TERMINAL FACILITY FOR FRESH FOOD DISTRIBUTION ITEMIZED IN 9 SECTION 3(8)(II)(B) OF ACT 40 OF 2004 BY CONTRACT AWARDED BY 10 THE DEPARTMENT OF GENERAL SERVICES OR TO ACQUIRE A TERMINAL 11 FACILITY FOR FRESH FOOD DISTRIBUTION WITH AN OPTION TO 12 PURCHASE. 13 SECTION 22. SPECIAL PROVISIONS FOR PENNSYLVANIA FISH AND BOAT 14 COMMISSION PROJECTS. 15 NOTWITHSTANDING ANY OTHER PROVISION OF LAW TO THE CONTRARY, 16 THE INDIVIDUAL CAPITAL PROJECTS IN THE CATEGORY OF PUBLIC 17 IMPROVEMENT PROJECTS TO BE ACQUIRED OR DEVELOPED BY THE 18 PENNSYLVANIA FISH AND BOAT COMMISSION ITEMIZED IN SECTION 19 11.2(1)(III), (V), (VI), (VII), (VIII), (IX), (X), (XI), (XII), 20 (XIII) AND (XIV) MAY BE FINANCED BY THE INCURRING OF DEBT 21 REPAYABLE FROM THE GENERAL FUND PURSUANT TO EXECUTIVE 22 AUTHORIZATIONS. 23 SECTION 24 23. SPECIAL CONTRACT PROVISIONS FOR REDEVELOPMENT <-- 24 ASSISTANCE CAPITAL PROJECTS. 25 ANY REDEVELOPMENT ASSISTANCE CAPITAL PROGRAM-ELIGIBLE 26 EXPENDITURE OF FUNDS INCURRED PRIOR TO JUNE 22, 2004, WHICH IS 27 DIRECTLY RELATED TO THE REDEVELOPMENT ASSISTANCE PROJECT 28 ITEMIZED IN SECTION 6(23)(V)(A) OF THE ACT OF JUNE 22, 2004 29 (P.L.257, NO.40), KNOWN AS THE CAPITAL BUDGET PROJECT 30 ITEMIZATION ACT OF 2003-2004, SHALL BE CONSIDERED ELIGIBLE TO BE 20070H1589B3496 - 296 -
1 UTILIZED AS A PORTION OF THE EXPENDITURE OF MATCHING FUNDS AND 2 SHALL BE CONSIDERED AS ELIGIBLE FOR REIMBURSEMENT FROM A 3 REDEVELOPMENT ASSISTANCE CAPITAL GRANT MADE PURSUANT TO THE 4 ITEMIZATION IN SECTION 6(23)(V)(A) OF THE CAPITAL BUDGET PROJECT 5 ITEMIZATION ACT OF 2003-2004. 6 Section 21 25 24 23. Editorial changes. <-- 7 In editing and preparing this act for printing following the 8 final enactment, the Legislative Reference Bureau shall insert 9 or revise letters or numbers for projects where the letters or 10 numbers are missing or require revision. The bureau shall also 11 revise the total monetary amounts for the total authorization, 12 debt authorization, appropriations and departmental totals as 13 necessary to agree with the total monetary amounts of the 14 projects. 15 Section 22 26 25 24. Effective date. <-- 16 This act shall take effect July 1, 2007, or immediately, 17 whichever is later. D9L72RZ/20070H1589B3496 - 297 -