                                                      PRINTER'S NO. 2466

THE GENERAL ASSEMBLY OF PENNSYLVANIA


HOUSE BILL

No. 1889 Session of 2003


        INTRODUCED BY McCALL, GEIST, MELIO, MARSICO, ALLEN, ARGALL,
           BEBKO-JONES, BELFANTI, BIANCUCCI, BROWNE, CORRIGAN,
           CREIGHTON, DALLY, DeWEESE, EACHUS, FABRIZIO, FRANKEL,
           GERGELY, GOODMAN, GORDNER, GRUCELA, HARHAI, HENNESSEY,
           HERMAN, HESS, HORSEY, KOTIK, LAUGHLIN, LEH, MANN, MARKOSEK,
           McGEEHAN, PISTELLA, RUFFING, SATHER, SAYLOR, SCAVELLO,
           SOLOBAY, TANGRETTI, THOMAS, TIGUE, WALKO, WOJNAROSKI AND
           YOUNGBLOOD, JULY 18, 2003

        REFERRED TO COMMITTEE ON APPROPRIATIONS, JULY 18, 2003

                                     AN ACT

     1  Providing for the highway capital budget project itemization for
     2     the fiscal year 2003-2004.

     3     The General Assembly of the Commonwealth of Pennsylvania
     4  hereby enacts as follows:
     5                             CHAPTER 1
     6                         GENERAL PROVISIONS
     7  Section 101.  Short title.
     8     This act shall be known and may be cited as the Highway
     9  Capital Budget Project Itemization Act of 2003-2004.
    10  Section 102.  Total authorization.
    11     The total authorization for the capital projects itemized in
    12  this act and to be constructed by the Department of
    13  Transportation, its successors or assigns and to be financed
    14  from current revenues of the Motor License Fund shall be
    15  $0,000,000,000.

     1  Section 103.  Itemization of public highway projects.
     2     Additional capital projects in the category of public highway
     3  projects to be constructed by the Department of Transportation,
     4  its successors or assigns and to be financed from current
     5  revenues of the Motor License Fund are itemized in Chapter 3,
     6  together with their respective estimated financial costs.
     7                             CHAPTER 3
     8                         ITEMIZED PROJECTS
     9                                                           Total
    10                                                          Project
    11             Project                                    Allocation
    12  Section 301.  Adams County.
    13     (a)  SR 30
    14         (1)  Coordinate and Interconnect Traffic
    15             Signals on SR 30, 4th Street to West
    16             Street; US 15: Lincoln Avenue to
    17             Washington Street and Middle Street to
    18             Confederate Avenue, Gettysburg Borough        600,000
    19             (Base Project Allocation - $500,000)
    20             (Land Allocation - $40,000)
    21             (Design and Contingencies - $60,000)
    22     (b)  SR 94
    23         (1)  Widen, Reconstruct and Add Center Turn
    24             Lane on SR 94 from Adams/York County
    25             Line to Apple Road (SR 1015), Conewago,
    26             Berwick and Oxford Townships                  781,000
    27             (Base Project Allocation - $600,000)
    28             (Land Allocation - $70,000)
    29             (Design and Contingencies - $111,000)
    30  Section 302.  Allegheny County.
    20030H1889B2466                  - 2 -     

     1     (a)  SR 22
     2         (1)  Highway Restoration and Interchange
     3             Reconstruction at SR 22/30 and SR 60
     4             Interchange, North Fayette and Robinson
     5             Townships                                   4,600,000
     6             (Base Project Allocation - $4,000,000)
     7             (Land Allocation - $200,000)
     8             (Design and Contingencies - $400,000)
     9         (2)  Reconstruction of Ramps at McDonald
    10             and Noblestown Interchange on SR 22,
    11             North Fayette Township                      1,072,000
    12             (Base Project Allocation - $840,000)
    13             (Land Allocation - $100,000)
    14             (Design and Contingencies - $132,000)
    15         (3)  Reconstruction of Interchange Ramps on
    16             SR 22 at Imperial and Hanky Farms
    17             Interchange, North Fayette Township         1,392,000
    18             (Base Project Allocation - $1,160,000)
    19             (Land Allocation - $100,000)
    20             (Design and Contingencies - $132,000)
    21     (b)  SR 28
    22         (1)  Widening and Construction of New
    23             Interchange on SR 28, Frazer Township       3,200,000
    24             (Base Project Allocation - $3,000,000)
    25             (Design and Contingencies - $200,000)
    26     (c)  SR 88
    27         (1)  Widen SR 88 from SR 3037 to Grove
    28             Road, Castle Shannon Borough                1,367,000
    29             (Base Project Allocation - $980,000)
    30             (Land Allocation - $200,000)
    20030H1889B2466                  - 3 -     

     1             (Design and Contingencies - $187,000)
     2         (2)  Restoration of SR 88, 3037 School
     3             Street - Castle Shannon Boulevard,
     4             Bethel Park and Castle Shannon
     5             Boroughs                                      820,000
     6             (Base Project Allocation - $380,000)
     7             (Land Allocation - $270,000)
     8             (Design and Contingencies - $170,000)
     9         (3)  Reconstruction of SR 88, McKeilly Road
    10             to 6th Street, City of Pittsburgh and
    11             Castle Shannon Borough                      1,123,000
    12             (Base Project Allocation - $654,000)
    13             (Land Allocation - $209,000)
    14             (Design and Contingencies - $260,000)
    15     (d)  SR 837
    16         (1)  Reconstruction of SR 837 from Rankin
    17             Bridge to Ravine Street, Munhall and
    18             Whitaker Boroughs                           2,537,000
    19             (Base Project Allocation - $2,115,000)
    20             (Land Allocation - $126,000)
    21             (Design and Contingencies - $296,000)
    22  Section 303.  Armstrong County. (Reserved)
    23  Section 304.  Beaver County.
    24     (a)  SR 51
    25         (1)  Reconstruction of SR 51 and Franklin
    26             Avenue Interchange, City of Aliquippa       1,936,000
    27             (Base Project Allocation - $1,200,000)
    28             (Land Allocation - $220,000)
    29             (Design and Contingencies - $516,000)
    30     (b)  SR 3016
    20030H1889B2466                  - 4 -     

     1         (1)  New Alignment of SR 3016 from West of
     2             Raccoon Creek Bridge to East of
     3             Interchange with SR 3013                      552,000
     4             (Base Project Allocation - $552,000)
     5  Section 305.  Bedford County.
     6     (a)  SR 56
     7         (1)  Safety Improvements to SR 56 and SR
     8             4032 and T-559, East St. Clair
     9             Township                                      577,000
    10             (Base Project Allocation - $500,000)
    11             (Land Allocation - $50,000)
    12             (Design and Contingencies - $27,000)
    13         (2)  Add Lane to SR 56 in Vicinity of
    14             Chestnut Ridge School, East St. Clair
    15             Township                                    1,070,000
    16             (Base Project Allocation - $880,000)
    17             (Land Allocation - $62,000)
    18             (Design and Contingencies - $128,000)
    19         (3)  Addition of a Lane to SR 56 at SR
    20             4028, T-541 and SR 4015, East St. Clair
    21             Township                                      592,000
    22             (Base Project Allocation - $426,000)
    23             (Land Allocation - $74,000)
    24             (Design and Contingencies - $92,000)
    25         (4)  Reconstruction and Relocation of SR
    26             56, East of Somerset County Line to
    27             East of Pleasantville Mountain Curve,
    28             West St. Clair Township                     6,200,000
    29             (Base Project Allocation - $6,000,000)
    30             (Design and Contingencies - $200,000)
    20030H1889B2466                  - 5 -     

     1  Section 306.  Berks County.
     2     (a)  SR 61
     3         (1)  Reconstruction, Safety Improvements
     4             and Relocation of Mountain Road, SR 61
     5             in Vicinity of I-78 and Associated
     6             Intersections in the Hamburg Area,
     7             Tilden Township                             4,000,000
     8             (Base Project Allocation - $3,000,000)
     9             (Land Allocation - $500,000)
    10             (Design and Contingencies - $500,000)
    11         (2)  Intersection Improvement at SR 61/SR
    12             225 Intersection, Shamokin and Coal
    13             Townships                                   1,630,000
    14             (Base Project Allocation - $1,200,000)
    15             (Land Allocation - $70,000)
    16             (Design and Contingencies - $360,000)
    17     (b)  SR 222
    18         (1)  Resurface SR 222 Kutztown Bypass,
    19             Maxatawny and Richmond Townships            1,117,000
    20             (Base Project Allocation - $807,000)
    21             (Land Allocation - $250,000)
    22             (Design and Contingencies - $60,000)
    23         (2)  Resurface SR 222 from Penn Avenue to
    24             Exeter Township Business 422, Cumru,
    25             Exeter, Reading and West Reading
    26             Townships                                   1,150,000
    27             (Base Project Allocation - $1,000,000)
    28             (Land Allocation - $100,000)
    29             (Design and Contingencies - $50,000)
    30     (c)  SR 422
    20030H1889B2466                  - 6 -     

     1         (1)  Restoration of SR 422 from West Shore
     2             Bypass to West Wyomissing Spring, West
     3             Lawn, Wyomissing, West Wyomissing
     4             Townships                                   1,310,000
     5             (Base Project Allocation - $1,000,000)
     6             (Land Allocation - $250,000)
     7             (Design and Contingencies - $60,000)
     8     (d)  SR 501
     9         (1)  Reconstruction and Safety Improvements
    10             to SR 501 in the Vicinity of
    11             Interchange of I-78 and PA 501, Bethel
    12             Township                                    3,000,000
    13             (Base Project Allocation - $2,400,000)
    14             (Land Allocation - $300,000)
    15             (Design and Contingencies - $300,000)
    16  Section 307.  Blair County.
    17     (a)  SR 6036
    18         (1)  Roadway Extension, 9th Avenue
    19             Extension Between 8th Street in Juniata
    20             and PA 36, City of Altoona                  8,360,000
    21             (Base Project Allocation - $6,000,000)
    22             (Land Allocation - $2,100,000)
    23             (Design and Contingencies - $260,000)
    24         (2)  Construction of a New Roadway, Park
    25             Avenue Extension: SR 4010 Southward to
    26             SR 1009, Logan Township                       880,000
    27             (Base Project Allocation - $600,000)
    28             (Land Allocation - $100,000)
    29             (Design and Contingencies - $180,000)
    30     (b)  SR 453
    20030H1889B2466                  - 7 -     

     1         (1)  Restoration of SR 453, I-99 to the
     2             Pemberton Bridge, Warriors Mark and
     3             Snyder Townships                            2,630,000
     4             (Base Project Allocation - $2,200,000)
     5             (Land Allocation - $90,000)
     6             (Design and Contingencies - $340,000)
     7  Section 308.  Bradford County. (Reserved)
     8  Section 309.  Bucks County.
     9     (a)  SR 202
    10         (1)  Four-lane Divided Relocation of SR 202
    11             from PA 463 to Pickertown Road,
    12             Montgomery and Warrington Townships        22,294,000
    13             (Base Project Allocation - $20,834,000)
    14             (Land Allocation - $1,260,000)
    15             (Design and Contingencies - $200,000)
    16         (2)  Four-lane Divided Relocation of SR 202
    17             from Pickertown Road to PA 611 Bypass,
    18             Doylestown Borough                         31,570,000
    19             (Base Project Allocation - $27,830,000)
    20             (Land Allocation - $3,440,000)
    21             (Design and Contingencies - $300,000)
    22     (b)  SR 232
    23         (1)  Signal and Safety Improvements to SR
    24             232/Nesham, Wrightstown Township            1,045,000
    25             (Base Project Allocation - $320,000)
    26             (Land Allocation - $525,000)
    27             (Design and Contingencies - $200,000)
    28     (c)  SR 313
    29         (1)  Safety Improvements to SR 313, Ferry
    30             Road to Broad Street, Quakertown              780,000
    20030H1889B2466                  - 8 -     

     1             (Base Project Allocation - $600,000)
     2             (Land Allocation - $120,000)
     3             (Design and Contingencies - $60,000)
     4     (d)  SR 2002
     5         (1)  Restoration and Drainage Improvement
     6             to SR 2002, Elm Avenue to Neshaminy
     7             Creek, Bristol Township                     1,010,000
     8             (Base Project Allocation - $800,000)
     9             (Land Allocation - $50,000)
    10             (Design and Contingencies - $160,000)
    11     (e)  SR 2025
    12         (1)  Intersection Improvements to Bristol
    13             Road, Hulmeville to Old Lincoln
    14             Highway                                       895,000
    15             (Base Project Allocation - $500,000)
    16             (Land Allocation - $20,000)
    17             (Design and Contingencies - $375,000)
    18     (f)  SR 2033
    19         (1)  Intersection Improvement to SR 2033,
    20             Woodbourne Road at Langhorne-Yardley
    21             Intersection, Middletown Township             320,000
    22             (Base Project Allocation - $200,000)
    23             (Land Allocation -$70,000)
    24             (Design and Contingencies - $50,000)
    25     (g)  SR 2036
    26         (1)  Reconstruction and Realignment of SR
    27             2036, Swamp Road: PA 413 to Rushland
    28             Road, Newtown and Wrightstown
    29             Townships                                   1,799,000
    30             (Base Project Allocation - $1,149,000)
    20030H1889B2466                  - 9 -     

     1             (Land Allocation - $350,000)
     2             (Design and Contingencies - $300,000)
     3     (h)  SR 2038
     4         (1)  Construct New Roadway, County Line
     5             Road from Bustleton Pike to Philmont
     6             Avenue, Lower Southampton Township            750,000
     7             (Land Allocation - $250,000)
     8             (Design and Contingencies - $500,000)
     9         (2)  Widen SR 2038 from Stump Road to Kulp
    10             Road, Horsham, Montgomery and
    11             Warrington Townships                          740,000
    12             (Base Project Allocation - $500,000)
    13             (Land Allocation - $40,000)
    14             (Design and Contingencies - $200,000)
    15         (3)  Add Lanes and Widen SR 2038, US 202-
    16             Upper State Road, New Britain and
    17             Montgomery Townships                        3,200,000
    18             (Base Project Allocation - $2,900,000)
    19             (Design and Contingencies - $300,000)
    20     (j)  SR 6309
    21         (1)  New Alignment of SR 6309 Between PA
    22             309 and PA 663, Milford Township            1,310,000
    23             (Base Project Allocation - $1,200,000)
    24             (Land Allocation - $10,000)
    25             (Design and Contingencies - $100,000)
    26  Section 310.  Butler County.
    27     (a)  I-79
    28         (1)  Restoration of I-79 from Allegheny
    29             County Line to SR 3025, Cranberry and
    30             Jackson Townships                             380,000
    20030H1889B2466                 - 10 -     

     1             (Base Project Allocation - $350,000)
     2             (Design and Contingencies - $30,000)
     3         (2)  Restoration of I-79 from SR 3025 to PA
     4             488, Jackson, Lancaster and Muddy Creek
     5             Townships                                     390,000
     6             (Base Project Allocation - $360,000)
     7             (Design and Contingencies - $30,000)
     8         (3)  Restoration of I-79 from PA 488 to
     9             Lawrence County Line, Muddy Creek and
    10             Worth Townships                               380,000
    11             (Base Project Allocation - $350,000)
    12             (Design and Contingencies - $30,000)
    13     (b)  SR 3020
    14         (1)  Widen SR 3020, Freedom Road, Beaver
    15             County to US 19, Cranberry Township         5,240,000
    16             (Base Project Allocation - $4,000,000)
    17             (Land Allocation - $900,000)
    18             (Design and Contingencies - $340,000)
    19  Section 311.  Cambria County.
    20     (a)  SR 22
    21         (1)  Safety and Traffic Flow Improvements
    22             to SR 22 from East of US 219 Overpass
    23             to West of SR 3034, Cambria Township          600,000
    24             (Base Project Allocation - $400,000)
    25             (Land Allocation - $100,000)
    26             (Design and Contingencies - $100,000)
    27     (b)  SR 56
    28         (1)  Relocation of SR 56 from Broad Street
    29             to the Westmoreland County Line, City
    30             of Johnstown and Lower Yoder Township      15,860,000
    20030H1889B2466                 - 11 -     

     1             (Base Project Allocation - $14,960,000)
     2             (Land Allocation - $4,000,000)
     3             (Design and Contingencies - $500,000)
     4     (c)  SR 219
     5         (1)  Relocation of SR 219 from Carrolltown
     6             to Clearfield County Line, East
     7             Carroll, West Carroll and Susquehanna
     8             Townships                                  45,300,000
     9             (Base Project Allocation - $40,700,000)
    10             (Land Allocation - $4,000,000)
    11             (Design and Contingencies - $600,000)
    12         (2)  Restoration and Safety Improvements to
    13             SR 219 from US 22 to US 422, Cambria
    14             Township                                      900,000
    15             (Base Project Allocation - $800,000)
    16             (Design and Contingencies - $100,000)
    17         (3)  Safety Improvement to SR 219, Maple
    18             and Clinton Streets, City of Johnstown        226,000
    19             (Base Project Allocation - $173,000)
    20             (Land Allocation - $33,000)
    21             (Design and Contingencies - $20,000)
    22     (d)  SR 756
    23         (1)  Widen SR 756 from Scalp Avenue to
    24             Luther Road, Geistown Borough and
    25             Richland Township                             910,000
    26             (Base Project Allocation - $600,000)
    27             (Land Allocation - $190,000)
    28             (Design and Contingencies - $120,000)
    29  Section 312.  Cameron County. (Reserved)
    30  Section 313.  Carbon County.
    20030H1889B2466                 - 12 -     

     1     (a)  SR 54
     2         (1)  Reconstruction and Realignment of SR
     3             54 from Schuylkill County Line to
     4             Industrial Road, Borough of
     5             Nesquehoning                                1,760,000
     6             (Base Project Allocation - $1,500,000)
     7             (Land Allocation - $100,000)
     8             (Design and Contingencies - $160,000)
     9     (b)  SR 443
    10         (1)  Widen SR 443 from Mall Road to Thomas
    11             J. McCall Memorial Bridge, Lehighton
    12             Borough and Mahoning Township               1,400,000
    13             (Base Project Allocation - $1,000,000)
    14             (Land Allocation - $200,000)
    15             (Design and Contingencies - $200,000)
    16  Section 314.  Centre County. (Reserved)
    17  Section 315.  Chester County.
    18     (a)  SR 30
    19         (1)  Intersection Improvement to US 30 at
    20             Waterloo Road and Devon Boulevard,
    21             Easttown Township                             869,000
    22             (Base Project Allocation - $700,000)
    23             (Land Allocation - $120,000)
    24             (Design and Contingencies - $49,000)
    25         (2)  Center Access Improvements, US 30 and
    26             Paoli Pike, Willistown and Tredyffrin
    27             Townships                                   2,900,000
    28             (Base Project Allocation - $2,200,000)
    29             (Land Allocation - $400,000)
    30             Design and Contingencies - $300,000)
    20030H1889B2466                 - 13 -     

     1     (b)  SR 41
     2         (1)  Intersection and Corridor Improvements
     3             to PA 41, US 30-PA 926, Various
     4             Municipalities                              1,600,000
     5             (Land Allocation - $1,000,000)
     6             (Design and Contingencies - $600,000)
     7     (c)  SR 100
     8         (1)  New Alignment of SR 100, Eagle Loop
     9             Road: PA Turnpike - Byers Road, Uwchlan
    10             and Upper Uwchlan Townships                 1,500,000
    11             (Base Project Allocation - $1,500,000)
    12         (2)  Safety, Interchange and Bridge
    13             Improvements to PA 100: PA 113 to
    14             Township Line Road, Uwchlan Township        3,256,000
    15             (Base Project Allocation - $2,936,000)
    16             (Land Allocation - $320,000)
    17     (d)  SR 202
    18         (1)  Roadway and Bridge Reconstruction of
    19             SR 202 from Swedesford Road (South) to
    20             Abandoned Railroad, East Whiteland and
    21             Tredyffrin Townships                        8,000,000
    22             (Base Project Allocation - $8,000,000)
    23         (2)  Installation of Traffic and Incident
    24             Management System on SR 202 from Route
    25             1 to North SR 29, US 30 to PA 340, PA
    26             100 to PA Turnpike, Various
    27             Municipalities                              4,000,000
    28             (Base Project Allocation - $4,000,000)
    29     (e)  SR 322
    30         (1)  Intersection Improvements to US 322,
    20030H1889B2466                 - 14 -     

     1             Main Street at PA 10, Conestoga Avenue,
     2             Honeybrook Borough                            550,000
     3             (Base Project Allocation - $400,000)
     4             (Land Allocation - $50,000)
     5             (Design and Contingencies - $100,000)
     6     (f)  SR 422
     7         (1)  Reconstruction of SR 422 from
     8             Schuylkill River to Norfolk Southern
     9             Railroad, North Coventry and Lower
    10             Pottsgrove Townships                       12,050,000
    11             (Base Project Allocation - $11,120,000)
    12             (Land Allocation - $30,000)
    13             (Design and Contingencies - $900,000)
    14     (g)  SR 926
    15         (1)  Channelize and Realign SR 926, Street
    16             Road at PA 352 and S Curve East of PA
    17             352, Westtown Township                        620,000
    18             (Base Project Allocation - $480,000)
    19             (Land Allocation - $140,000)
    20     (h)  SR 2014
    21         (1)  Intersection Improvements to SR 2014,
    22             B2 - Paoli Pike at North Five Points,
    23             West Goshen Township                          630,000
    24             (Base Project Allocation - $500,000)
    25             (Land Allocation - $50,000)
    26             (Design and Contingencies - $80,000)
    27     (i)  SR 3033
    28         (1)  Channelization and Safety Improvements
    29             to SR 3033, Newark Road at Hillendale
    30             Road, New Garden Township                     800,000
    20030H1889B2466                 - 15 -     

     1             (Base Project Allocation - $500,000)
     2             (Land Allocation - $100,000)
     3             (Design and Contingencies - $200,000)
     4  Section 316.  Clarion County. (Reserved)
     5  Section 317.  Clearfield County.
     6     (a)  SR 3006
     7         (1)  Relocation Including New Intersection
     8             of SR 3006, Water Street Relocation,
     9             Westover Borough                            1,915,000
    10             (Base Project Allocation - $700,000)
    11             (Land Allocation - $1,000,000)
    12             (Design and Contingencies - $215,000)
    13  Section 318.  Clinton County. (Reserved)
    14  Section 319.  Columbia County. (Reserved)
    15  Section 320.  Crawford County.
    16     (a)  SR 6
    17         (1)  Safety and Traffic Flow Improvements,
    18             US 6/19/322, Various Municipalities           300,000
    19             (Base Project Allocation - $200,000)
    20             (Land Allocation - $50,000)
    21             (Design and Contingencies - $50,000)
    22  Section 321.  Cumberland County.
    23     (a)  SR 11
    24         (1)  Relocation of Eastbound Lanes of SR
    25             11, Village of New Kingstown, Silver
    26             Spring Township                             1,020,000
    27             (Base Project Allocation - $800,000)
    28             (Land Allocation - $20,000)
    29             (Design and Contingencies - $200,000)
    30         (2)  Safety and Traffic Flow Improvements
    20030H1889B2466                 - 16 -     

     1             on SR 11, PA 581 Interchange to I-81,
     2             Camp Hill and Wormleysburg Boroughs,
     3             East Pennsboro Township                       600,000
     4             (Base Project Allocation - $400,000)
     5             (Land Allocation - $100,000)
     6             (Design and Contingencies - $100,000)
     7     (b)  I-81
     8         (1)  Improve Interchange of I-81 at Exit 44
     9             Interchange with PA 465, South
    10             Middletown Township                         6,972,000
    11             (Base Construction Allocation -
    12             $6,000,000)
    13             (Land Allocation - $300,000)
    14             (Design and Contingencies - $672,000)
    15     (c)  SR 174
    16         (1)  Add Lane to SR 174 from US 11 to I-81
    17             Interchange, Shippensburg Borough and
    18             Southampton Township                          460,000
    19             (Base Project Allocation - $360,000)
    20             (Land Allocation - $70,000)
    21             (Design and Contingencies - $30,000)
    22     (d)  SR 1010
    23         (1)  Safety and Traffic Flow Improvements
    24             to SR 1010 from PA 34 to 32nd Street in
    25             Camp Hill, Carlisle and Camp Hill
    26             Boroughs                                      600,000
    27             (Base Project Allocation - $400,000)
    28             (Land Allocation - $100,000)
    29             (Design and Contingencies - $100,000)
    30  Section 322.  Dauphin County.
    20030H1889B2466                 - 17 -     

     1     (a)  SR 39
     2         (1)  Widen SR 39 from Old Jonestown Road to
     3             West of Fairville Avenue, West Hanover
     4             Township                                    1,548,000
     5             (Base Project Allocation - $1,440,000)
     6             (Land Allocation - $25,000)
     7             (Design and Contingencies - $83,000)
     8         (2)  Reconstruction of SR 39, Linglestown
     9             Road and Square, Lower Paxton Township        150,000
    10             (Base Project Allocation - $100,000)
    11             (Land Allocation - $5,000)
    12             (Design and Contingencies - $45,000)
    13     (b)  PA 283
    14         (1)  Construct an Intermodal Transfer
    15             Center on SR 230 along Amtrak Rail Line
    16             Near Harrisburg International Airport,
    17             Lower Swatara Township                        823,000
    18             (Base Project Allocation - $823,000)
    19     (c)  SR 322
    20         (1)  Upgrade Traffic Signals and Realign
    21             Intersection of US 322 and PA 743,
    22             Derry Township                                820,000
    23             (Base Project Allocation - $600,000)
    24             (Land Allocation - $100,000)
    25             (Design and Contingencies - $120,000)
    26     (d)  SR 3010
    27         (1)  Reconstruction and Safety Improvements
    28             to SR 3010, Paxton Street, Harrisburg,
    29             40th Street, Chambers Hill and Lindle
    30             Road, Eisenhower Boulevard, Swatara
    20030H1889B2466                 - 18 -     

     1             Township                                    4,000,000
     2             (Base Project Allocation - $3,000,000)
     3             (Land Allocation - $500,000)
     4             (Design and Contingencies - $500,000)
     5  Section 323.  Delaware County.
     6     (a)  I-95
     7         (1)  Roadway Restoration of I-95, Delaware
     8             Expressway in Vicinity of Darby Creek
     9             Bridge, Ridley Township                       700,000
    10             (Base Project Allocation - $336,000)
    11             (Land Allocation - $5,000)
    12             (Design and Contingencies - $359,000)
    13         (2)  Interchange Improvement of I-95 with
    14             US 322 Interchange and Local Access,
    15             Chester Township                            4,800,000
    16             (Base Project Allocation - $1,600,000)
    17             (Land Allocation - $3,000,000)
    18             (Design and Contingencies - $200,000)
    19         (3)  Widen I-95 and US 322 Ramps, Chester
    20             City                                        4,580,000
    21             (Base Project Allocation - $4,000,000)
    22             (Land Allocation - $280,000)
    23             (Design and Contingencies - $300,000)
    24         (4)  Installation of Traffic and Incident
    25             Management System on I-95 from PA 291
    26             to I-476, Ridley and Tinicum Townships,
    27             Ridley Park Borough, City of
    28             Philadelphia                                  670,000
    29             (Base Project Allocation - $500,000)
    30             (Land Allocation - $10,000)
    20030H1889B2466                 - 19 -     

     1             (Design and Contingencies - $160,000)
     2     (b) SR 252
     3         (1)  Intersection Improvement on SR 252
     4             from Palmers Mill Road to Kirk Lane,
     5             Upper Providence Township                   3,004,000
     6             (Base Project Allocation - $2,352,000)
     7             (Land Allocation - $300,000)
     8             (Design and Contingencies - $352,000)
     9     (c)  SR 3009
    10         (1)  Intersection Improvement of SR 3009,
    11             Chichester and Meetinghouse Road, Upper
    12             Chichester Township                           360,000
    13             (Base Project Allocation - $200,000)
    14             (Land Allocation - $100,000)
    15             (Design and Contingencies - $60,000)
    16  Section 324.  Elk County. (Reserved)
    17  Section 325.  Erie County.
    18     (a)  SR 5
    19         (1)  Safety and Traffic Flow Improvements
    20             to SR 5 (12th Street) from I-79 to
    21             Franklin Avenue, Millcreek and Lawrence
    22             Park Townships and City of Erie               606,000
    23             (Base Project Allocation - $200,000)
    24             (Design and Contingencies - $406,000)
    25     (b)  SR 89
    26         (1)  Safety and Traffic Flow Improvements
    27             to SR 89 from I-79 to Franklin Avenue,
    28             Millcreek and Lawrence Park Townships
    29             and City of Erie                            1,100,000
    30             (Base Project Allocation - $800,000)
    20030H1889B2466                 - 20 -     

     1             (Land Allocation - $200,000)
     2             (Design and Contingencies - $100,000)
     3     (c)  SR 832
     4         (1)  Relocation and Reconstruction of SR
     5             832, Peninsula Drive, 6th Street to
     6             Presque Isle State Park, City of Erie       1,640,000
     7             (Base Project Allocation - $1,450,000)
     8             (Land Allocation - $170,000)
     9             (Design and Contingencies - $20,000)
    10     (d)  SR 4009
    11         (1)  Widening and Intersection Improvements
    12             to SR 4009, Asbury Road, 12th Street to
    13             26th Street, Millcreek Township               800,000
    14             (Base Project Allocation - $600,000)
    15             (Land Allocation - $100,000)
    16             (Design and Contingencies - $100,000)
    17  Section 326.  Fayette County.
    18     (a)  SR 21
    19         (1)  Widen SR 21 from SR 166 Intersection
    20             to S&T Drive, German Township                 779,000
    21             (Base Project Allocation - $160,000)
    22             (Land Allocation - $200,000)
    23             (Design and Contingencies - $419,000)
    24         (2)  Widen SR 21 from S&T Drive to Route
    25             40, City of Uniontown, South Union and
    26             Menallen Townships                          6,416,000
    27             (Base Project Allocation - $6,000,000)
    28             (Land Allocation - $216,000)
    29             (Design and Contingencies - $200,000)
    30     (b)  SR 40
    20030H1889B2466                 - 21 -     

     1         (1)  Reconstruction of US 40 at Chalk Hill,
     2             Wharton Township                              410,000
     3             (Base Project Allocation - $150,000)
     4             (Land Allocation - $120,000)
     5             (Design and Contingencies - $140,000)
     6     (c)  SR 119
     7         (1)  Restoration of SR 119, Everson Exit to
     8             Westmoreland County Line, Bullskin and
     9             Upper Tyrone Townships                        466,000
    10             (Base Project Allocation - $400,000)
    11             (Land Allocation - $40,000)
    12             (Design and Contingencies - $26,000)
    13         (2)  Interchange of SR 119, Add Two Ramps
    14             at Morgantown Interchange, South Union
    15             Township                                      620,000
    16             (Base Project Allocation - $200,000)
    17             (Land Allocation - $100,000)
    18             (Design and Contingencies - $320,000)
    19     (d)  SR 711
    20         (1)  Restoration of SR 711, Connellsville
    21             to Chestnut Ridge, Connellsville and
    22             Springhill Townships                          390,000
    23             (Base Project Allocation - $300,000)
    24             (Land Allocation - $50,000)
    25             (Design and Contingencies - $40,000)
    26  Section 327.  Forest County. (Reserved)
    27  Section 328.  Franklin County.
    28     (a)  I-81
    29         (1)  Resurface and Rehabilitate I-81 from
    30             Exit 10 to Exit 20, Greene and Guilford
    20030H1889B2466                 - 22 -     

     1             Townships                                   2,168,000
     2             (Base Project Allocation - $1,568,000)
     3             (Land Allocation - $150,000)
     4             (Design and Contingencies - $450,000)
     5         (2)  Reconstruction and Safety Improvements
     6             of I-81 and PA 696 Fayette Street
     7             Interchange, Southampton Township             600,000
     8             (Base Project Allocation - $400,000)
     9             (Land Allocation - $100,000)
    10             (Design and Contingencies - $100,000)
    11  Section 329.  Fulton County. (Reserved)
    12  Section 330.  Greene County. (Reserved)
    13  Section 331.  Huntingdon County.
    14     (a)  SR 26
    15         (1)  Safety Improvement to SR 26 at Jackson
    16             Corners, Miller Township                      545,000
    17             (Base Project Allocation - $290,000)
    18             (Land Allocation - $40,000)
    19             (Design and Contingencies - $215,000)
    20         (2)  Safety Improvement, Intersections of
    21             SR 26 at Harry's Valley Road and SR
    22             1029, Barree Township                       2,984,000
    23             (Base Project Allocation - $2,860,000)
    24             (Land Allocation - $65,000)
    25             (Design and Contingencies - $59,000)
    26  Section 332.  Indiana County.
    27     (a)  SR 422
    28         (1)  Reconstruction, Widening, Safety
    29             Improvements to SR 422, Armstrong
    30             County Line to Cambria County Line          2,600,000
    20030H1889B2466                 - 23 -     

     1             (Base Project Allocation - $2,000,000)
     2             (Land Allocation - $400,000)
     3             (Design and Contingencies - $200,000)
     4  Section 333.  Jefferson County. (Reserved)
     5  Section 334.  Juniata County. (Reserved)
     6  Section 335.  Lackawanna County.
     7     (a)  I-81
     8         (1)  Preventive Maintenance, LLTS
     9             Interstate 81 in Luzerne and Lackawanna
    10             Counties                                    1,200,000
    11             (Base Project Allocation - $1,200,000)
    12  Section 336.  Lancaster County.
    13     (a)  SR 41
    14         (1)  Widen SR 41 to Three Lanes from Truck
    15             Climbing Lane to Dutchmans Market,
    16             Sadsbury Township                             496,000
    17             (Base Project Allocation - $233,000)
    18             (Land Allocation - $40,000)
    19             (Design and Contingencies - $225,000)
    20         (2)  Add Lane to SR 41 from US-30 to T-942,
    21             Salisbury Township                            527,000
    22             (Base Project Allocation - $385,000)
    23             (Land Allocation - $14,000)
    24             (Design and Contingencies - $126,000)
    25     (b)  SR 72
    26         (1)  Relocation, Reconstruction and Safety
    27             Improvements to SR 72, Various
    28             Townships                                   2,600,000
    29             (Base Project Allocation - $2,000,000)
    30             (Land Allocation - $200,000)
    20030H1889B2466                 - 24 -     

     1             (Design and Contingencies - $400,000)
     2     (c)  SR 272
     3         (1)  Resurface, Rehabilitate and Paint
     4             Bridges on SR 272 from PA 741 to
     5             Smithville, West Lampeter, Pequea and
     6             Providence Townships                        2,089,000
     7             (Base Project Allocation - $1,940,000)
     8             (Land Allocation - $20,000)
     9             (Design and Contingencies - $129,000)
    10     (d)  SR 441
    11         (1)  Resurface, Rehabilitate and Paint
    12             Bridges on SR 441 Corridor, Columbia
    13             Borough and West Hempfield Township         2,220,000
    14             (Base Project Allocation - $2,000,000)
    15             (Land Allocation - $220,000)
    16     (e)  SR 1026
    17         (1)  Reconstruction of SR 1026 from Wallups
    18             Hill Road to West of Kline Road, West
    19             Cocalico Township                             444,000
    20             (Base Project Allocation - $184,000)
    21             (Land Allocation - $60,000)
    22             (Design and Contingencies - $200,000)
    23  Section 337.  Lawrence County.
    24     (a)  SR 422
    25         (1)  Reconstruction of SR 422 from New
    26             Castle to Rose Point, Slippery Rock,
    27             Shenango and Union Townships                  250,000
    28             (Design and Contingencies - $250,000)
    29     (b)  SR 1005
    30         (1)  Reconstruction of SR 1005 from the
    20030H1889B2466                 - 25 -     

     1             Intersection of Maitland Lane to the
     2             Mercer County Line, Neshannock and
     3             Wilmington Townships                          946,000
     4             (Base Project Allocation - $636,000)
     5             (Land Allocation - $210,000)
     6             (Design and Contingencies - $100,000)
     7     (c)  SR 4014
     8         (1)  Reconstruction of SR 4014, State
     9             Street, New Castle and Union Township         774,000
    10             (Base Project Allocation - $536,000)
    11             (Land Acquisition - $238,000)
    12  Section 338.  Lebanon County.
    13     (a)  SR 422
    14         (1)  Widen, Reconstruct Associated Roadways
    15             and Safety Improvements to US 422 and
    16             Lingle Avenue, Palmyra Borough and
    17             Derry Township (Dauphin County)             3,000,000
    18             (Base Project Allocation - $3,000,000)
    19     (b)  SR 501
    20         (1)  Intersection Improvement to SR 501
    21             College Street and SR 2011 Richland
    22             Avenue Intersection, Myerstown Borough        610,000
    23             (Base Project Allocation - $450,000)
    24             (Land Allocation - $60,000)
    25             (Design and Contingencies - $100,000)
    26     (c)  SR 4020
    27         (1)  Update Shoulders, Level and Overlay on
    28             SR 4020 from PA 72 to SR 4019 through
    29             Fort Indiantown Gap, East Hanover             490,000
    30             (Base Construction Allocation -
    20030H1889B2466                 - 26 -     

     1             $460,000)
     2             (Land Allocation - $10,000)
     3             (Design and Contingencies - $20,000)
     4  Section 339.  Lehigh County.
     5     (a)  I-78
     6         (1)  Reconstruction of I-78, Black River
     7             Road Bridge Overpass and Saucon Park
     8             Bridge, Lower Saucon Township                 415,000
     9             (Base Project Allocation - $350,000)
    10             (Land Allocation - $25,000)
    11             (Design and Contingencies - $40,000)
    12  Section 340.  Luzerne County.
    13     (a)  SR 1021
    14         (1)  Construct New Roadway, SR 1021, from
    15             the Eight Street Bridge to Interstate
    16             Route 81, Jenkins and Pittston
    17             Townships                                     540,000
    18             (Base Project Allocation - $400,000)
    19             (Land Allocation - $100,000)
    20             (Design and Contingencies - $40,000)
    21     (b)  I-81
    22         (1)  Interchange Improvement on I-81 at
    23             Exit 178, Avoca                               700,000
    24             (Base Project Allocation - $400,000)
    25             (Land Allocation - $100,000)
    26             (Design and Contingencies - $200,000)
    27     (c)  SR 93
    28         (1)  Restoration and Widening of SR 93 from
    29             Rock Glen Road to County Road,
    30             Conyngham Borough                             300,000
    20030H1889B2466                 - 27 -     

     1             (Base Project Allocation - $300,000)
     2  Section 341.  Lycoming County.
     3     (a)  SR 220
     4         (1)  Restoration of SR 220 from Fire Hall
     5             to Lycoming Creek Bridges, Woodward
     6             Township                                    2,570,000
     7             (Base Project Allocation - $2,500,000)
     8             (Design and Contingencies - $70,000)
     9  Section 342.  McKean County. (Reserved)
    10  Section 343.  Mercer County.
    11     (a)  SR 60-01L
    12         (1)  Signing and Lighting of SR 60 at I-80,
    13             Shenango Township                             700,000
    14             (Base Project Allocation - $400,000)
    15             (Design and Contingencies - $300,000)
    16     (b)  SR 3014
    17         (1)  Resurface of SR 3014 from Buhl Farm
    18             Road to PA 18 (Hermitage Road), City of
    19             Hermitage                                     620,000
    20             (Base Project Allocation - $500,000)
    21             (Land Acquisition - $100,000)
    22             (Design and Contingencies - $20,000)
    23  Section 344.  Mifflin County. (Reserved)
    24  Section 345.  Monroe County.
    25     (a)  I-80
    26         (1)  Safety Improvements to I-80, Tobyhanna
    27             Township                                    1,240,000
    28             (Base Project Allocation - $1,200,000)
    29             (Design and Contingencies - $40,000)
    30     (b)  SR 209
    20030H1889B2466                 - 28 -     

     1         (1)  Safety and Traffic Flow Improvements
     2             to SR 209 in Monroe County from SR
     3             209/SR 33 Intersection to Carbon
     4             County, Polk, Chestnuthill and Hamilton
     5             Townships                                     800,000
     6             (Base Project Allocation - $600,000)
     7             (Land Allocation - $100,000)
     8             (Design and Contingencies - $100,000)
     9         (2)  Median Barrier/Safety Improvements to
    10             SR 209 from SR 33 and SR 209,
    11             Northampton County Line to I-80,
    12             Hamilton and Stroud Townships                 302,000
    13             (Base Project Allocation - $302,000)
    14  Section 346.  Montgomery County.
    15     (a)  SR 63
    16         (1)  Intersection Improvements to SR 63,
    17             Welsh Road at Limekiln Pike and
    18             Norristown Road, Horsham and Upper
    19             Dublin Townships                              310,000
    20             (Base Project Allocation - $200,000)
    21             (Land Allocation - $10,000)
    22             (Design and Contingencies - $100,000)
    23     (b)  SR 73
    24         (1)  Safety and Intersection Improvements
    25             to SR 73, Plank/Otts/Meyers/Seltz
    26             Roads: SR 73-Township Line Road,
    27             Skippack and Perkiomen Townships              895,000
    28             (Base Project Allocation - $520,000)
    29             (Land Allocation - $105,000)
    30             (Design and Contingencies - $270,000)
    20030H1889B2466                 - 29 -     

     1     (c)  SR 202
     2         (1)  Widen to Four Lanes, US 202, Dekalb
     3             Pike: Johnson Highway - PA 309,
     4             Whitpain and East Norriton Townships
     5             and Norristown Borough                     11,800,000
     6             (Base Project Allocation - $8,800,000)
     7             (Land Allocation - $2,800,000)
     8             (Design and Contingencies - $200,000)
     9         (2)  Widen and Intersection Improvements to
    10             SR 202 from Swedesford Road to Morris
    11             Road, Whitpain Township                     5,600,000
    12             (Base Project Allocation - $3,600,000)
    13             (Land Allocation - $2,000,000)
    14         (3)  Widen SR 202 from Johnson Highway to
    15             Swedesford Road, Norristown Borough,
    16             East Norriton and Whitpain Townships        1,520,000
    17             (Land Allocation - $1,520,000)
    18         (4)  Reconstruction and Widen SR 202 from
    19             Morris Road To PA 63, Montgomery, Upper
    20             and Lower Gwynedd, and Whitpain
    21             Townships                                   4,240,000
    22             (Base Project Allocation - $3,000,000)
    23             (Land Allocation - $1,240,000)
    24         (5)  Relocation of SR 202 from Hancock Road
    25             to US 309, Lower and Upper Gwynedd
    26             Township and Montgomery Township            1,000,000
    27             (Base Project Allocation - $1,000,000)
    28         (6)  Widen and Signalization of SR 202 at
    29             Five Points Intersection (PA 309, PA
    30             463 and US 202), Montgomery Township        1,020,000
    20030H1889B2466                 - 30 -     

     1             (Base Project Allocation - $400,000)
     2             (Land Allocation - $620,000)
     3     (d)  SR 309
     4         (1)  Reconstruction of SR 309 from Haws
     5             Lane to Pennsylvania Avenue, Upper
     6             Dublin and Whitemarsh Townships            12,000,000
     7             (Base Project Allocation - $12,000,000)
     8     (e)  SR 363
     9         (1)  Intersection and Signal Improvements,
    10             Sumneytown at SR 363, Valley Forge
    11             Road, Towamencin and Upper Gwynedd
    12             Township                                    2,400,000
    13             (Base Project Allocation - $2,400,000)
    14     (f)  SR 422
    15         (1)  New Interchange, SR 422 at PA 363,
    16             West Norriton and Lower Providence
    17             Townships                                   4,400,000
    18             (Base Project Allocation - $4,000,000)
    19             (Land Allocation - $200,000)
    20             (Design and Contingencies - $200,000)
    21     (g)  SR 463
    22         (1)  Widen SR 463 (Horsham Road): North
    23             Wales Road to General Hancock Road,
    24             Montgomery Township                           520,000
    25             (Base Project Allocation - $520,000)
    26     (h)  SR 2001
    27         (1)  Intersection Improvements, SR 2001,
    28             Morris Road at North Wales (North and
    29             South Leg), Worcester and Whitpain
    30             Townships                                     422,000
    20030H1889B2466                 - 31 -     

     1             (Base Project Allocation - $230,000)
     2             (Land Allocation - $60,000)
     3             (Design and Contingencies - $132,000)
     4     (i)  SR 2027
     5         (1)  Intersection Improvements, SR 2027,
     6             Pennsylvania Avenue at Camp Hill Road,
     7             Springfield Township                        1,131,000
     8             (Base Project Allocation - $760,000)
     9             (Land Allocation - $138,000)
    10             (Design and Contingencies - $233,000)
    11     (j)  SR 3045
    12         (1)  Corridor Improvements to SR 3045 from
    13             Rock Hill Road to Belmont Avenue, Lower
    14             Merion Township                             1,300,000
    15             (Base Project Allocation - $1,300,000)
    16  Section 347.  Montour County. (Reserved)
    17  Section 348.  Northampton County.
    18     (a)  I-78
    19         (1)  Restoration of I-78, Lower Saucon
    20             Township and Bethlehem                        665,000
    21             (Base Project Allocation - $600,000)
    22             (Land Allocation - $25,000)
    23             (Design and Contingencies - $40,000)
    24  Section 349.  Northumberland County. (Reserved)
    25  Section 350.  Perry County.
    26     (a)  SR 11
    27         (1)  Resurface SR 11 from I-81 to Perdix
    28             Village, Marysville Borough and Penn
    29             Township                                      575,000
    30             (Base Project Allocation - $500,000)
    20030H1889B2466                 - 32 -     

     1             (Land Acquisition - $55,000)
     2             (Design and Contingencies - $20,000)
     3     (b)  SR 274
     4         (1)  Widen and Improve Intersection of SR
     5             274 and Friendly Drive, Penn Township         475,000
     6             (Base Project Allocation - $475,000)
     7     (c)  SR 849
     8         (1)  Reconstruction and Drainage
     9             Improvements to SR 849 at Duncannon
    10             Subway, Penn Township                         540,000
    11             (Base Project Allocation - $400,000)
    12             (Land Allocation - $100,000)
    13             (Design and Contingencies - $40,000)
    14  Section 351.  Philadelphia County.
    15     (a)  I-95
    16         (1)  Reconstruction of I-95, Ann Street to
    17             Frankford Creek, City of Philadelphia       6,300,000
    18             (Base Project Allocation - $3,500,000)
    19             (Land Allocation - $1,000,000)
    20             (Design and Contingencies - $1,800,000)
    21         (2)  Reconstruction and Interchange
    22             Improvements to I-95, Frankford Avenue
    23             to Orthodox Street, City of
    24             Philadelphia                               15,600,000
    25             (Base Project Allocation - $8,000,000)
    26             (Land Allocation - $5,400,000)
    27             (Design and Contingencies - $2,200,000)
    28         (3)  Reconstruction and Interchange
    29             Improvements to I-95, Orthodox Street
    30             to Levick Street, City of Philadelphia      9,430,000
    20030H1889B2466                 - 33 -     

     1             (Base Project Allocation - $7,500,000)
     2             (Land Allocation - $800,000)
     3             (Design and Contingencies - $1,130,000)
     4         (4)  Reconstruction and Interchange
     5             Improvements to I-95, Levick Street to
     6             Bleigh Avenue, City of Philadelphia        12,525,000
     7             (Base Project Allocation - $8,500,000)
     8             (Land Allocation - $1,025,000)
     9             (Design and Contingencies - $3,000,000)
    10         (5)  Reconstruction and Safety Improvements
    11             to I-95, Shackamaxon Street and Ann
    12             Street, City of Philadelphia               17,368,000
    13             (Base Project Allocation - $12,500,000)
    14             (Land Allocation - $1,400,000)
    15             (Design and Contingencies - $3,468,000)
    16         (6)  Reconstruction and Operational
    17             Improvements to I-95, Bleigh Avenue to
    18             Academy Road, Philadelphia County           6,700,000
    19             (Base Project Allocation - $4,000,000)
    20             (Land Allocation - $800,000)
    21             (Design and Contingencies - $1,900,000)
    22     (b)  SR 1007
    23         (1)  Construct New Roadway, Adams Avenue
    24             Connector, Torresdale to Aramingo
    25             Avenue                                        656,000
    26             (Base Project Allocation - $286,000)
    27             (Land Allocation - $10,000)
    28             (Design and Contingencies - $360,000)
    29     (c)  SR 3007
    30         (1)  Installation of New Roadway Lighting
    20030H1889B2466                 - 34 -     

     1             of SR 3007, Benjamin Franklin Parkway
     2             from 16th to 25th Street, City of
     3             Philadelphia                                  700,000
     4             (Base Project Allocation - $700,000)
     5     (d)  SR 4007
     6         (1)  Reconstruction of SR 4007, Germantown
     7             Avenue: Allens Lane to Cresheim Valley
     8             Drive, City of Philadelphia                   960,000
     9             (Base Project Allocation - $800,000)
    10             (Land Allocation - $80,000)
    11             (Design and Contingencies - $80,000)
    12  Section 352.  Pike County.
    13     (a)  I-84
    14         (1)  Restoration of I-84, Wayne County Line
    15             to Delaware River Bridge                      400,000
    16             (Base Project Allocation - $400,000)
    17  Section 353.  Potter County.
    18     (a)  SR 6
    19         (1)  Restoration and Reconstruction of SR
    20             6, Main Street, Galeton Borough               650,000
    21             (Base Project Allocation - $500,000)
    22             (Land Allocation - $90,000)
    23             (Design and Contingencies - $60,000)
    24  Section 354.  Schuylkill County.
    25     (a)  I-81
    26         (1)  Restoration and Safety Improvements to
    27             I-81, Lebanon County to Luzerne County        640,000
    28             (Base Project Allocation - $600,000)
    29             (Design and Contingencies - $40,000)
    30  Section 355.  Snyder County.
    20030H1889B2466                 - 35 -     

     1     (a)  SR 11
     2         (1)  Restoration of SR 11, Selinsgrove
     3             Bypass, Monroe, Penn, Selinsgrove and
     4             Union Townships                               966,000
     5             (Base Project Allocation - $840,000)
     6             (Design and Contingencies - $126,000)
     7     (b)  SR 15
     8         (1)  Wetland Mitigation Site for SR 15,
     9             Central Susquehanna Valley
    10             Transportation Project, Monroe and
    11             Shamokin Dam Townships                        350,000
    12             (Base Project Allocation - $200,000)
    13             (Land Allocation - $50,000)
    14             (Design and Contingencies - $100,000)
    15  Section 356.  Somerset County.
    16     (a)  SR 219
    17         (1)  New 4-lane Roadway on SR 219 from
    18             Meyersdale Bypass to Maryland State
    19             Line, Salisbury Borough, Elk Lick and
    20             Summit Townships                           32,085,000
    21             (Base Project Allocation - $28,000,000)
    22             (Land Allocation - $1,000,000)
    23             (Design and Contingencies - $3,085,000)
    24  Section 357.  Sullivan County.
    25     (a)  SR 220
    26         (1)  Reconstruction of SR 220 from SR 42 in
    27             Muncy Valley to Sonestown, Davidson
    28             Township                                      790,000
    29             (Base Project Allocation - $700,000)
    30             (Land Allocation - $30,000)
    20030H1889B2466                 - 36 -     

     1             (Design and Contingencies - $60,000)
     2  Section 358.  Susquehanna County.
     3     (a)  I-81
     4         (1)  Preventative Maintenance on I-81,
     5             Great Bend and New Milford Townships          350,000
     6             (Base Project Allocation - $350,000)
     7     (b)  SR 706
     8         (1)  Reconstruction of SR 706 from Fairdale
     9             to West Montrose, Jessup and
    10             Bridgewater Townships                         305,000
    11             (Base Project Allocation - $300,000)
    12             (Land Allocation - $5,000)
    13         (2)  Reconstruction of SR 706, Montrose to
    14             Tiffany Montrose Borough, Bridgewater
    15             Township                                      300,000
    16             (Base Project Allocation - $300,000)
    17         (3)  Reconstruction of SR 706 from Tiffany
    18             to US 11, Bridgewater and New Milford
    19             Townships                                     460,000
    20             (Base Project Allocation - $400,000)
    21             (Land Allocation - $20,000)
    22             (Design and Contingencies - $40,000)
    23         (4)  Reconstruction of SR 706 and SR 3023,
    24             Rush Township                                 400,000
    25             (Base Project Allocation - $400,000)
    26  Section 359.  Tioga County. (Reserved)
    27  Section 360.  Union County. (Reserved)
    28  Section 361.  Venago County. (Reserved)
    29  Section 362.  Warren County. (Reserved)
    30  Section 363.  Washington County.
    20030H1889B2466                 - 37 -     

     1     (a)  SR 18
     2         (1)  Intersection Improvement to SR 18/SR
     3             4008 Intersections, Burgettstown
     4             Borough                                       390,000
     5             (Base Project Allocation - $30,000)
     6             (Land Allocation - $210,000)
     7             (Design and Contingencies - $150,000)
     8     (b)  I-79
     9         (1)  Restoration of I-79, SR 40 to I-70/I-
    10             79 Interchange, Amwell and South
    11             Strabane                                     615,000
    12             (Base Project Allocation - $315,000)
    13             (Land Allocation - $100,000)
    14             (Design and Contingencies - $200,000)
    15     (c)  SR 88
    16         (1)  Intersection Improvement of SR 88/SR
    17             1006 Intersection, Finleyville                390,000
    18             (Base Project Allocation - $90,000)
    19             (Land Allocation - $220,000)
    20             (Design and Contingencies - $80,000)
    21         (2)  Add Lane and Signal Improvement to SR
    22             88 at Intersection of SR 88 and SR 837,
    23             Carroll Township                              349,000
    24             (Base Project Allocation - $80,000)
    25             (Land Allocation - $85,000)
    26             (Design and Contingencies - $184,000)
    27     (d)  SR 136
    28         (1)  Restoration and Safety Improvements to
    29             SR 136, Various Curves Near
    30             Monongahela, Carroll Township                300,000
    20030H1889B2466                 - 38 -     

     1             (Base Project Allocation - $100,000)
     2             (Land Allocation - $100,000)
     3             (Design and Contingencies - $100,000)
     4         (2)  Intersection Improvement of SR 136 at
     5             SR 917 and SR 1087, Carroll and
     6             Fallowfield Townships                         545,000
     7             (Base Project Allocation - $95,000)
     8             (Land Allocation - $250,000)
     9             (Design and Contingencies - $200,000)
    10         (3)  Intersection Improvement of SR
    11             136/1055 Intersection, Somerset
    12             Township                                      645,000
    13             (Base Project Allocation - $95,000)
    14             (Land Allocation - $350,000)
    15             (Design and Contingencies - $200,000)
    16     (e)  SR 519
    17         (1)  Intersection Improvement at SR 519/
    18             1055 Intersection, North Strabane
    19             Township                                      600,000
    20             (Base Project Allocation - $150,000)
    21             (Land Allocation - $250,000)
    22             (Design and Contingencies - $200,000)
    23         (2)  Signal Improvement and Channelization
    24             of SR 519 at Intersection of SR 519 at
    25             980 and 19 South-bound ramps, North
    26             Strabane Township                             300,000
    27             (Base Project Allocation - $100,000)
    28             (Land Allocation - $100,000)
    29             (Design and Contingencies - $100,000)
    30     (f)  SR 980
    20030H1889B2466                 - 39 -     

     1         (1)  Intersection Improvement at SR 980,
     2             South Approach to PA 50, Cecil
     3             Township                                      395,000
     4             (Base Project Allocation - $200,000)
     5             (Land Allocation - $85,000)
     6             (Design and Contingencies - $110,000)
     7     (g)  SR 2040
     8         (1)  Restoration of SR 2044, 2023 and 8030
     9             Near I-70 Interchange, Bentleyville
    10             Borough                                       300,000
    11             (Base Project Allocation - $300,000)
    12         (2)  Add Turning Lane to SR 2040 Between
    13             Pittsburgh Street and I-70,
    14             Bentleyville Borough and Somerset
    15             Township                                      500,000
    16             (Base Project Allocation - $100,000)
    17             (Land Allocation - $200,000)
    18             (Design and Contingencies - $200,000)
    19     (h)  SR 8013
    20         (1)  Interchange Improvement of SR 8013 at
    21             I-79 to SR 1047, Chartiers Township           995,000
    22             (Base Project Allocation - $600,000)
    23             (Land Allocation - $65,000)
    24             (Design and Contingencies - $330,000)
    25  Section 364.  Wayne County. (Reserved)
    26  Section 365.  Westmoreland County.
    27     (a)  SR 30
    28         (1)  Widening and Safety Improvements to SR
    29             30 from Irwin Turnpike to the Allegheny
    30             County Line, North Huntingdon               1,200,000
    20030H1889B2466                 - 40 -     

     1             (Base Project Allocation - $1,000,000)
     2             (Land Allocation - $100,000)
     3             (Design and Contingencies - $100,000)
     4         (2)  Intersection Improvement to SR 30/981,
     5             Intersection Latrobe Airport, Unity
     6             Township                                    2,400,000
     7             (Base Project Allocation - $800,000)
     8             (Land Allocation - $1,100,000)
     9             (Design and Contingencies - $500,000)
    10     (b)  I-70
    11         (1)  Interchange Improvement, I-70, New
    12             Stanton Borough                             1,900,000
    13             (Base Project Allocation - $1,500,000)
    14             (Land Allocation - $250,000)
    15             (Design and Contingencies - $150,000)
    16     (c)  SR 119
    17         (1)  Reconstruction and Interchange
    18             Improvement to SR 119, Sony
    19             Interchange, Westmoreland County            1,520,000
    20             (Base Project Allocation - $1,200,000)
    21             (Land Allocation - $120,000)
    22             (Design and Contingencies - $200,000)
    23     (d)  SR 130
    24         (1)  Restoration of SR 130 from SR 4002 to
    25             Toll 66, Hempfield Township                   530,000
    26             (Base Project Allocation - $500,000)
    27             (Land Allocation - $5,000)
    28             (Design and Contingencies - $25,000)
    29         (2)  Intersection Improvement, SR 130
    30             Improvements, Penn Township                   350,000
    20030H1889B2466                 - 41 -     

     1             (Land Allocation - $150,000)
     2             (Design and Contingencies - $200,000)
     3         (3)  Intersection Improvement of SR 130 at
     4             Pleasant Valley Road Intersection, Penn
     5             Township                                      550,000
     6             (Base Project Allocation - $100,000)
     7             (Land Allocation - $250,000)
     8             (Design and Contingencies - $200,000)
     9     (e)  SR 366
    10         (1)  Signal and Safety Improvement to SR
    11             366 from 56 to Tarentum Bridge: North
    12             from SR 56 LA Murrysville, New
    13             Kensington and Washington Townships         1,200,000
    14             (Base Project Allocation - $600,000)
    15             (Land Allocation - $250,000)
    16             (Design and Contingencies - $350,000)
    17     (f)  SR 1045
    18         (1)  Two Lane Relocation of SR 1045 at St.
    19             Vincent College, Unity Township             1,125,000
    20             (Base Project Allocation - $600,000)
    21             (Land Allocation - $125,000)
    22             (Design and Contingencies - $400,000)
    23  Section 366.  Wyoming County.
    24     (a)  SR 6
    25         (1)  Restoration and Resurfacing of SR 6,
    26             Meshoppen Township                            560,000
    27             (Base Project Allocation - $560,000)
    28  Section 367.  York County.
    29     (a)  SR 30
    30         (1)  Widening and Intersection Improvements
    20030H1889B2466                 - 42 -     

     1             to SR 30, Realignment of a Portion of
     2             Eden Road at Intersection of US 30 and
     3             Eden Road, Springettsbury Township          1,000,000
     4             (Base Project Allocation - $1,000,000)
     5     (b)  SR 74
     6         (1)  Safety Improvement to SR 74 from
     7             Maryland Line to Red Lion Borough,
     8             Various Townships                           1,200,000
     9             (Base Project Allocation - $1,000,000)
    10             (Land Allocation - $100,000)
    11             (Design and Contingencies - $100,000)
    12         (2)  Realignment of SR 74 from High Street
    13             and Sunset Lane, West Manchester
    14             Township                                      440,000
    15             (Base Project Allocation - $200,000)
    16             (Land Allocation - $220,000)
    17             (Design and Contingencies - $20,000)
    18     (c)  I-83
    19         (1)  Interchange and Safety Improvements to
    20             I-83, Exits 6, 7 and 8, Various
    21             Municipalities                              1,490,000
    22             (Base Project Allocation - $1,050,000)
    23             (Land Allocation - $200,000)
    24             (Design and Contingencies - $240,000)
    25         (2)  Resurface and Ramp Improvements to I-
    26             83 from Maryland to PA 214, Hopewell,
    27             Shrewsbury and Springfield Townships          824,000
    28             (Base Project Allocation - $739,000)
    29             (Land Allocation - $60,000)
    30             (Design and Contingencies - $25,000)
    20030H1889B2466                 - 43 -     

     1         (3)  Resurface and Ramp Improvements to I-
     2             83 from Exit 4 to Exit 5, Spring
     3             Garden, York                                7,131,000
     4             (Base Project Allocation - $6,200,000)
     5             (Land Allocation - $500,000)
     6             (Design and Contingencies - $431,000)
     7     (d)  SR 94
     8         (1)  Widen SR 94 from Kuhn Drive to Appler
     9             Road, Various Municipalities                2,440,000
    10             (Base Project Allocation - $1,500,000)
    11             (Land Allocation - $501,000)
    12             (Design and Contingencies - $439,000)
    13     (e)  SR 116
    14         (1)  Realign Intersection of SR 116 at
    15             York, Jefferson and Lehman Streets,
    16             North Codorus Township                        370,000
    17             (Base Project Allocation - $160,000)
    18             (Land Allocation - $60,000)
    19             (Design and Contingencies - $150,000)
    20     (f)  SR 124
    21         (1)  Reconstruct and Widen SR 124, Mt. Rose
    22             Avenue from Haines Road to Edgewood
    23             Road, Springettsbury Township                 539,000
    24             (Base Project Allocation - $400,000)
    25             (Land Allocation - $100,000)
    26             (Design and Contingencies - $39,000)
    27     (g)  SR 2011
    28         (1)  Reconstruct and Realign SR 2011 from
    29             Nursery Road to Mt. Pisgah Road, Hellam
    30             and Lower Windsor Township                  1,320,000
    20030H1889B2466                 - 44 -     

     1             (Base Project Allocation - $1,000,000)
     2             (Land Allocation - $170,000)
     3             (Design and Contingencies - $150,000)
     4     (h)  SR 4001
     5         (1)  Curve Realignment of SR 4001,
     6             Greenbriar Road to Church Road,
     7             Manchester and West Manchester
     8             Townships                                     454,000
     9             (Base Project Allocation - $269,000)
    10             (Land Allocation - $35,000)
    11             (Design and Contingencies - $150,000)
    12                             CHAPTER 5
    13                      MISCELLANEOUS PROVISIONS
    14  Section 501.  Federal funds.
    15     All moneys received from the Federal Government for the
    16  construction of the projects specifically itemized in this act
    17  are also hereby appropriated for those projects.
    18  Section 502.  Allocation of funds.
    19     Whenever as determined by the Department of Transportation
    20  that the full estimated financial costs of the projects itemized
    21  in this act are not necessary for the proper design, acquisition
    22  or construction of such projects, the excess funds no longer
    23  required may be allocated by the Pennsylvania Department of
    24  Transportation to increase the estimated costs of any one or
    25  more of the projects specifically itemized in a capital budget.
    26  Section 503.  Estimated useful life.
    27     The General Assembly states that the estimated useful life of
    28  the highway capital projects itemized in this act is 30 years.
    29  Section 504.  Effective date.
    30     This act shall take effect immediately.
    F14L72RZ/20030H1889B2466        - 45 -