PRINTER'S NO. 2466
No. 1889 Session of 2003
INTRODUCED BY McCALL, GEIST, MELIO, MARSICO, ALLEN, ARGALL, BEBKO-JONES, BELFANTI, BIANCUCCI, BROWNE, CORRIGAN, CREIGHTON, DALLY, DeWEESE, EACHUS, FABRIZIO, FRANKEL, GERGELY, GOODMAN, GORDNER, GRUCELA, HARHAI, HENNESSEY, HERMAN, HESS, HORSEY, KOTIK, LAUGHLIN, LEH, MANN, MARKOSEK, McGEEHAN, PISTELLA, RUFFING, SATHER, SAYLOR, SCAVELLO, SOLOBAY, TANGRETTI, THOMAS, TIGUE, WALKO, WOJNAROSKI AND YOUNGBLOOD, JULY 18, 2003
REFERRED TO COMMITTEE ON APPROPRIATIONS, JULY 18, 2003
AN ACT 1 Providing for the highway capital budget project itemization for 2 the fiscal year 2003-2004. 3 The General Assembly of the Commonwealth of Pennsylvania 4 hereby enacts as follows: 5 CHAPTER 1 6 GENERAL PROVISIONS 7 Section 101. Short title. 8 This act shall be known and may be cited as the Highway 9 Capital Budget Project Itemization Act of 2003-2004. 10 Section 102. Total authorization. 11 The total authorization for the capital projects itemized in 12 this act and to be constructed by the Department of 13 Transportation, its successors or assigns and to be financed 14 from current revenues of the Motor License Fund shall be 15 $0,000,000,000.
1 Section 103. Itemization of public highway projects. 2 Additional capital projects in the category of public highway 3 projects to be constructed by the Department of Transportation, 4 its successors or assigns and to be financed from current 5 revenues of the Motor License Fund are itemized in Chapter 3, 6 together with their respective estimated financial costs. 7 CHAPTER 3 8 ITEMIZED PROJECTS 9 Total 10 Project 11 Project Allocation 12 Section 301. Adams County. 13 (a) SR 30 14 (1) Coordinate and Interconnect Traffic 15 Signals on SR 30, 4th Street to West 16 Street; US 15: Lincoln Avenue to 17 Washington Street and Middle Street to 18 Confederate Avenue, Gettysburg Borough 600,000 19 (Base Project Allocation - $500,000) 20 (Land Allocation - $40,000) 21 (Design and Contingencies - $60,000) 22 (b) SR 94 23 (1) Widen, Reconstruct and Add Center Turn 24 Lane on SR 94 from Adams/York County 25 Line to Apple Road (SR 1015), Conewago, 26 Berwick and Oxford Townships 781,000 27 (Base Project Allocation - $600,000) 28 (Land Allocation - $70,000) 29 (Design and Contingencies - $111,000) 30 Section 302. Allegheny County. 20030H1889B2466 - 2 -
1 (a) SR 22 2 (1) Highway Restoration and Interchange 3 Reconstruction at SR 22/30 and SR 60 4 Interchange, North Fayette and Robinson 5 Townships 4,600,000 6 (Base Project Allocation - $4,000,000) 7 (Land Allocation - $200,000) 8 (Design and Contingencies - $400,000) 9 (2) Reconstruction of Ramps at McDonald 10 and Noblestown Interchange on SR 22, 11 North Fayette Township 1,072,000 12 (Base Project Allocation - $840,000) 13 (Land Allocation - $100,000) 14 (Design and Contingencies - $132,000) 15 (3) Reconstruction of Interchange Ramps on 16 SR 22 at Imperial and Hanky Farms 17 Interchange, North Fayette Township 1,392,000 18 (Base Project Allocation - $1,160,000) 19 (Land Allocation - $100,000) 20 (Design and Contingencies - $132,000) 21 (b) SR 28 22 (1) Widening and Construction of New 23 Interchange on SR 28, Frazer Township 3,200,000 24 (Base Project Allocation - $3,000,000) 25 (Design and Contingencies - $200,000) 26 (c) SR 88 27 (1) Widen SR 88 from SR 3037 to Grove 28 Road, Castle Shannon Borough 1,367,000 29 (Base Project Allocation - $980,000) 30 (Land Allocation - $200,000) 20030H1889B2466 - 3 -
1 (Design and Contingencies - $187,000) 2 (2) Restoration of SR 88, 3037 School 3 Street - Castle Shannon Boulevard, 4 Bethel Park and Castle Shannon 5 Boroughs 820,000 6 (Base Project Allocation - $380,000) 7 (Land Allocation - $270,000) 8 (Design and Contingencies - $170,000) 9 (3) Reconstruction of SR 88, McKeilly Road 10 to 6th Street, City of Pittsburgh and 11 Castle Shannon Borough 1,123,000 12 (Base Project Allocation - $654,000) 13 (Land Allocation - $209,000) 14 (Design and Contingencies - $260,000) 15 (d) SR 837 16 (1) Reconstruction of SR 837 from Rankin 17 Bridge to Ravine Street, Munhall and 18 Whitaker Boroughs 2,537,000 19 (Base Project Allocation - $2,115,000) 20 (Land Allocation - $126,000) 21 (Design and Contingencies - $296,000) 22 Section 303. Armstrong County. (Reserved) 23 Section 304. Beaver County. 24 (a) SR 51 25 (1) Reconstruction of SR 51 and Franklin 26 Avenue Interchange, City of Aliquippa 1,936,000 27 (Base Project Allocation - $1,200,000) 28 (Land Allocation - $220,000) 29 (Design and Contingencies - $516,000) 30 (b) SR 3016 20030H1889B2466 - 4 -
1 (1) New Alignment of SR 3016 from West of 2 Raccoon Creek Bridge to East of 3 Interchange with SR 3013 552,000 4 (Base Project Allocation - $552,000) 5 Section 305. Bedford County. 6 (a) SR 56 7 (1) Safety Improvements to SR 56 and SR 8 4032 and T-559, East St. Clair 9 Township 577,000 10 (Base Project Allocation - $500,000) 11 (Land Allocation - $50,000) 12 (Design and Contingencies - $27,000) 13 (2) Add Lane to SR 56 in Vicinity of 14 Chestnut Ridge School, East St. Clair 15 Township 1,070,000 16 (Base Project Allocation - $880,000) 17 (Land Allocation - $62,000) 18 (Design and Contingencies - $128,000) 19 (3) Addition of a Lane to SR 56 at SR 20 4028, T-541 and SR 4015, East St. Clair 21 Township 592,000 22 (Base Project Allocation - $426,000) 23 (Land Allocation - $74,000) 24 (Design and Contingencies - $92,000) 25 (4) Reconstruction and Relocation of SR 26 56, East of Somerset County Line to 27 East of Pleasantville Mountain Curve, 28 West St. Clair Township 6,200,000 29 (Base Project Allocation - $6,000,000) 30 (Design and Contingencies - $200,000) 20030H1889B2466 - 5 -
1 Section 306. Berks County. 2 (a) SR 61 3 (1) Reconstruction, Safety Improvements 4 and Relocation of Mountain Road, SR 61 5 in Vicinity of I-78 and Associated 6 Intersections in the Hamburg Area, 7 Tilden Township 4,000,000 8 (Base Project Allocation - $3,000,000) 9 (Land Allocation - $500,000) 10 (Design and Contingencies - $500,000) 11 (2) Intersection Improvement at SR 61/SR 12 225 Intersection, Shamokin and Coal 13 Townships 1,630,000 14 (Base Project Allocation - $1,200,000) 15 (Land Allocation - $70,000) 16 (Design and Contingencies - $360,000) 17 (b) SR 222 18 (1) Resurface SR 222 Kutztown Bypass, 19 Maxatawny and Richmond Townships 1,117,000 20 (Base Project Allocation - $807,000) 21 (Land Allocation - $250,000) 22 (Design and Contingencies - $60,000) 23 (2) Resurface SR 222 from Penn Avenue to 24 Exeter Township Business 422, Cumru, 25 Exeter, Reading and West Reading 26 Townships 1,150,000 27 (Base Project Allocation - $1,000,000) 28 (Land Allocation - $100,000) 29 (Design and Contingencies - $50,000) 30 (c) SR 422 20030H1889B2466 - 6 -
1 (1) Restoration of SR 422 from West Shore 2 Bypass to West Wyomissing Spring, West 3 Lawn, Wyomissing, West Wyomissing 4 Townships 1,310,000 5 (Base Project Allocation - $1,000,000) 6 (Land Allocation - $250,000) 7 (Design and Contingencies - $60,000) 8 (d) SR 501 9 (1) Reconstruction and Safety Improvements 10 to SR 501 in the Vicinity of 11 Interchange of I-78 and PA 501, Bethel 12 Township 3,000,000 13 (Base Project Allocation - $2,400,000) 14 (Land Allocation - $300,000) 15 (Design and Contingencies - $300,000) 16 Section 307. Blair County. 17 (a) SR 6036 18 (1) Roadway Extension, 9th Avenue 19 Extension Between 8th Street in Juniata 20 and PA 36, City of Altoona 8,360,000 21 (Base Project Allocation - $6,000,000) 22 (Land Allocation - $2,100,000) 23 (Design and Contingencies - $260,000) 24 (2) Construction of a New Roadway, Park 25 Avenue Extension: SR 4010 Southward to 26 SR 1009, Logan Township 880,000 27 (Base Project Allocation - $600,000) 28 (Land Allocation - $100,000) 29 (Design and Contingencies - $180,000) 30 (b) SR 453 20030H1889B2466 - 7 -
1 (1) Restoration of SR 453, I-99 to the 2 Pemberton Bridge, Warriors Mark and 3 Snyder Townships 2,630,000 4 (Base Project Allocation - $2,200,000) 5 (Land Allocation - $90,000) 6 (Design and Contingencies - $340,000) 7 Section 308. Bradford County. (Reserved) 8 Section 309. Bucks County. 9 (a) SR 202 10 (1) Four-lane Divided Relocation of SR 202 11 from PA 463 to Pickertown Road, 12 Montgomery and Warrington Townships 22,294,000 13 (Base Project Allocation - $20,834,000) 14 (Land Allocation - $1,260,000) 15 (Design and Contingencies - $200,000) 16 (2) Four-lane Divided Relocation of SR 202 17 from Pickertown Road to PA 611 Bypass, 18 Doylestown Borough 31,570,000 19 (Base Project Allocation - $27,830,000) 20 (Land Allocation - $3,440,000) 21 (Design and Contingencies - $300,000) 22 (b) SR 232 23 (1) Signal and Safety Improvements to SR 24 232/Nesham, Wrightstown Township 1,045,000 25 (Base Project Allocation - $320,000) 26 (Land Allocation - $525,000) 27 (Design and Contingencies - $200,000) 28 (c) SR 313 29 (1) Safety Improvements to SR 313, Ferry 30 Road to Broad Street, Quakertown 780,000 20030H1889B2466 - 8 -
1 (Base Project Allocation - $600,000) 2 (Land Allocation - $120,000) 3 (Design and Contingencies - $60,000) 4 (d) SR 2002 5 (1) Restoration and Drainage Improvement 6 to SR 2002, Elm Avenue to Neshaminy 7 Creek, Bristol Township 1,010,000 8 (Base Project Allocation - $800,000) 9 (Land Allocation - $50,000) 10 (Design and Contingencies - $160,000) 11 (e) SR 2025 12 (1) Intersection Improvements to Bristol 13 Road, Hulmeville to Old Lincoln 14 Highway 895,000 15 (Base Project Allocation - $500,000) 16 (Land Allocation - $20,000) 17 (Design and Contingencies - $375,000) 18 (f) SR 2033 19 (1) Intersection Improvement to SR 2033, 20 Woodbourne Road at Langhorne-Yardley 21 Intersection, Middletown Township 320,000 22 (Base Project Allocation - $200,000) 23 (Land Allocation -$70,000) 24 (Design and Contingencies - $50,000) 25 (g) SR 2036 26 (1) Reconstruction and Realignment of SR 27 2036, Swamp Road: PA 413 to Rushland 28 Road, Newtown and Wrightstown 29 Townships 1,799,000 30 (Base Project Allocation - $1,149,000) 20030H1889B2466 - 9 -
1 (Land Allocation - $350,000) 2 (Design and Contingencies - $300,000) 3 (h) SR 2038 4 (1) Construct New Roadway, County Line 5 Road from Bustleton Pike to Philmont 6 Avenue, Lower Southampton Township 750,000 7 (Land Allocation - $250,000) 8 (Design and Contingencies - $500,000) 9 (2) Widen SR 2038 from Stump Road to Kulp 10 Road, Horsham, Montgomery and 11 Warrington Townships 740,000 12 (Base Project Allocation - $500,000) 13 (Land Allocation - $40,000) 14 (Design and Contingencies - $200,000) 15 (3) Add Lanes and Widen SR 2038, US 202- 16 Upper State Road, New Britain and 17 Montgomery Townships 3,200,000 18 (Base Project Allocation - $2,900,000) 19 (Design and Contingencies - $300,000) 20 (j) SR 6309 21 (1) New Alignment of SR 6309 Between PA 22 309 and PA 663, Milford Township 1,310,000 23 (Base Project Allocation - $1,200,000) 24 (Land Allocation - $10,000) 25 (Design and Contingencies - $100,000) 26 Section 310. Butler County. 27 (a) I-79 28 (1) Restoration of I-79 from Allegheny 29 County Line to SR 3025, Cranberry and 30 Jackson Townships 380,000 20030H1889B2466 - 10 -
1 (Base Project Allocation - $350,000) 2 (Design and Contingencies - $30,000) 3 (2) Restoration of I-79 from SR 3025 to PA 4 488, Jackson, Lancaster and Muddy Creek 5 Townships 390,000 6 (Base Project Allocation - $360,000) 7 (Design and Contingencies - $30,000) 8 (3) Restoration of I-79 from PA 488 to 9 Lawrence County Line, Muddy Creek and 10 Worth Townships 380,000 11 (Base Project Allocation - $350,000) 12 (Design and Contingencies - $30,000) 13 (b) SR 3020 14 (1) Widen SR 3020, Freedom Road, Beaver 15 County to US 19, Cranberry Township 5,240,000 16 (Base Project Allocation - $4,000,000) 17 (Land Allocation - $900,000) 18 (Design and Contingencies - $340,000) 19 Section 311. Cambria County. 20 (a) SR 22 21 (1) Safety and Traffic Flow Improvements 22 to SR 22 from East of US 219 Overpass 23 to West of SR 3034, Cambria Township 600,000 24 (Base Project Allocation - $400,000) 25 (Land Allocation - $100,000) 26 (Design and Contingencies - $100,000) 27 (b) SR 56 28 (1) Relocation of SR 56 from Broad Street 29 to the Westmoreland County Line, City 30 of Johnstown and Lower Yoder Township 15,860,000 20030H1889B2466 - 11 -
1 (Base Project Allocation - $14,960,000) 2 (Land Allocation - $4,000,000) 3 (Design and Contingencies - $500,000) 4 (c) SR 219 5 (1) Relocation of SR 219 from Carrolltown 6 to Clearfield County Line, East 7 Carroll, West Carroll and Susquehanna 8 Townships 45,300,000 9 (Base Project Allocation - $40,700,000) 10 (Land Allocation - $4,000,000) 11 (Design and Contingencies - $600,000) 12 (2) Restoration and Safety Improvements to 13 SR 219 from US 22 to US 422, Cambria 14 Township 900,000 15 (Base Project Allocation - $800,000) 16 (Design and Contingencies - $100,000) 17 (3) Safety Improvement to SR 219, Maple 18 and Clinton Streets, City of Johnstown 226,000 19 (Base Project Allocation - $173,000) 20 (Land Allocation - $33,000) 21 (Design and Contingencies - $20,000) 22 (d) SR 756 23 (1) Widen SR 756 from Scalp Avenue to 24 Luther Road, Geistown Borough and 25 Richland Township 910,000 26 (Base Project Allocation - $600,000) 27 (Land Allocation - $190,000) 28 (Design and Contingencies - $120,000) 29 Section 312. Cameron County. (Reserved) 30 Section 313. Carbon County. 20030H1889B2466 - 12 -
1 (a) SR 54 2 (1) Reconstruction and Realignment of SR 3 54 from Schuylkill County Line to 4 Industrial Road, Borough of 5 Nesquehoning 1,760,000 6 (Base Project Allocation - $1,500,000) 7 (Land Allocation - $100,000) 8 (Design and Contingencies - $160,000) 9 (b) SR 443 10 (1) Widen SR 443 from Mall Road to Thomas 11 J. McCall Memorial Bridge, Lehighton 12 Borough and Mahoning Township 1,400,000 13 (Base Project Allocation - $1,000,000) 14 (Land Allocation - $200,000) 15 (Design and Contingencies - $200,000) 16 Section 314. Centre County. (Reserved) 17 Section 315. Chester County. 18 (a) SR 30 19 (1) Intersection Improvement to US 30 at 20 Waterloo Road and Devon Boulevard, 21 Easttown Township 869,000 22 (Base Project Allocation - $700,000) 23 (Land Allocation - $120,000) 24 (Design and Contingencies - $49,000) 25 (2) Center Access Improvements, US 30 and 26 Paoli Pike, Willistown and Tredyffrin 27 Townships 2,900,000 28 (Base Project Allocation - $2,200,000) 29 (Land Allocation - $400,000) 30 Design and Contingencies - $300,000) 20030H1889B2466 - 13 -
1 (b) SR 41 2 (1) Intersection and Corridor Improvements 3 to PA 41, US 30-PA 926, Various 4 Municipalities 1,600,000 5 (Land Allocation - $1,000,000) 6 (Design and Contingencies - $600,000) 7 (c) SR 100 8 (1) New Alignment of SR 100, Eagle Loop 9 Road: PA Turnpike - Byers Road, Uwchlan 10 and Upper Uwchlan Townships 1,500,000 11 (Base Project Allocation - $1,500,000) 12 (2) Safety, Interchange and Bridge 13 Improvements to PA 100: PA 113 to 14 Township Line Road, Uwchlan Township 3,256,000 15 (Base Project Allocation - $2,936,000) 16 (Land Allocation - $320,000) 17 (d) SR 202 18 (1) Roadway and Bridge Reconstruction of 19 SR 202 from Swedesford Road (South) to 20 Abandoned Railroad, East Whiteland and 21 Tredyffrin Townships 8,000,000 22 (Base Project Allocation - $8,000,000) 23 (2) Installation of Traffic and Incident 24 Management System on SR 202 from Route 25 1 to North SR 29, US 30 to PA 340, PA 26 100 to PA Turnpike, Various 27 Municipalities 4,000,000 28 (Base Project Allocation - $4,000,000) 29 (e) SR 322 30 (1) Intersection Improvements to US 322, 20030H1889B2466 - 14 -
1 Main Street at PA 10, Conestoga Avenue, 2 Honeybrook Borough 550,000 3 (Base Project Allocation - $400,000) 4 (Land Allocation - $50,000) 5 (Design and Contingencies - $100,000) 6 (f) SR 422 7 (1) Reconstruction of SR 422 from 8 Schuylkill River to Norfolk Southern 9 Railroad, North Coventry and Lower 10 Pottsgrove Townships 12,050,000 11 (Base Project Allocation - $11,120,000) 12 (Land Allocation - $30,000) 13 (Design and Contingencies - $900,000) 14 (g) SR 926 15 (1) Channelize and Realign SR 926, Street 16 Road at PA 352 and S Curve East of PA 17 352, Westtown Township 620,000 18 (Base Project Allocation - $480,000) 19 (Land Allocation - $140,000) 20 (h) SR 2014 21 (1) Intersection Improvements to SR 2014, 22 B2 - Paoli Pike at North Five Points, 23 West Goshen Township 630,000 24 (Base Project Allocation - $500,000) 25 (Land Allocation - $50,000) 26 (Design and Contingencies - $80,000) 27 (i) SR 3033 28 (1) Channelization and Safety Improvements 29 to SR 3033, Newark Road at Hillendale 30 Road, New Garden Township 800,000 20030H1889B2466 - 15 -
1 (Base Project Allocation - $500,000) 2 (Land Allocation - $100,000) 3 (Design and Contingencies - $200,000) 4 Section 316. Clarion County. (Reserved) 5 Section 317. Clearfield County. 6 (a) SR 3006 7 (1) Relocation Including New Intersection 8 of SR 3006, Water Street Relocation, 9 Westover Borough 1,915,000 10 (Base Project Allocation - $700,000) 11 (Land Allocation - $1,000,000) 12 (Design and Contingencies - $215,000) 13 Section 318. Clinton County. (Reserved) 14 Section 319. Columbia County. (Reserved) 15 Section 320. Crawford County. 16 (a) SR 6 17 (1) Safety and Traffic Flow Improvements, 18 US 6/19/322, Various Municipalities 300,000 19 (Base Project Allocation - $200,000) 20 (Land Allocation - $50,000) 21 (Design and Contingencies - $50,000) 22 Section 321. Cumberland County. 23 (a) SR 11 24 (1) Relocation of Eastbound Lanes of SR 25 11, Village of New Kingstown, Silver 26 Spring Township 1,020,000 27 (Base Project Allocation - $800,000) 28 (Land Allocation - $20,000) 29 (Design and Contingencies - $200,000) 30 (2) Safety and Traffic Flow Improvements 20030H1889B2466 - 16 -
1 on SR 11, PA 581 Interchange to I-81, 2 Camp Hill and Wormleysburg Boroughs, 3 East Pennsboro Township 600,000 4 (Base Project Allocation - $400,000) 5 (Land Allocation - $100,000) 6 (Design and Contingencies - $100,000) 7 (b) I-81 8 (1) Improve Interchange of I-81 at Exit 44 9 Interchange with PA 465, South 10 Middletown Township 6,972,000 11 (Base Construction Allocation - 12 $6,000,000) 13 (Land Allocation - $300,000) 14 (Design and Contingencies - $672,000) 15 (c) SR 174 16 (1) Add Lane to SR 174 from US 11 to I-81 17 Interchange, Shippensburg Borough and 18 Southampton Township 460,000 19 (Base Project Allocation - $360,000) 20 (Land Allocation - $70,000) 21 (Design and Contingencies - $30,000) 22 (d) SR 1010 23 (1) Safety and Traffic Flow Improvements 24 to SR 1010 from PA 34 to 32nd Street in 25 Camp Hill, Carlisle and Camp Hill 26 Boroughs 600,000 27 (Base Project Allocation - $400,000) 28 (Land Allocation - $100,000) 29 (Design and Contingencies - $100,000) 30 Section 322. Dauphin County. 20030H1889B2466 - 17 -
1 (a) SR 39 2 (1) Widen SR 39 from Old Jonestown Road to 3 West of Fairville Avenue, West Hanover 4 Township 1,548,000 5 (Base Project Allocation - $1,440,000) 6 (Land Allocation - $25,000) 7 (Design and Contingencies - $83,000) 8 (2) Reconstruction of SR 39, Linglestown 9 Road and Square, Lower Paxton Township 150,000 10 (Base Project Allocation - $100,000) 11 (Land Allocation - $5,000) 12 (Design and Contingencies - $45,000) 13 (b) PA 283 14 (1) Construct an Intermodal Transfer 15 Center on SR 230 along Amtrak Rail Line 16 Near Harrisburg International Airport, 17 Lower Swatara Township 823,000 18 (Base Project Allocation - $823,000) 19 (c) SR 322 20 (1) Upgrade Traffic Signals and Realign 21 Intersection of US 322 and PA 743, 22 Derry Township 820,000 23 (Base Project Allocation - $600,000) 24 (Land Allocation - $100,000) 25 (Design and Contingencies - $120,000) 26 (d) SR 3010 27 (1) Reconstruction and Safety Improvements 28 to SR 3010, Paxton Street, Harrisburg, 29 40th Street, Chambers Hill and Lindle 30 Road, Eisenhower Boulevard, Swatara 20030H1889B2466 - 18 -
1 Township 4,000,000 2 (Base Project Allocation - $3,000,000) 3 (Land Allocation - $500,000) 4 (Design and Contingencies - $500,000) 5 Section 323. Delaware County. 6 (a) I-95 7 (1) Roadway Restoration of I-95, Delaware 8 Expressway in Vicinity of Darby Creek 9 Bridge, Ridley Township 700,000 10 (Base Project Allocation - $336,000) 11 (Land Allocation - $5,000) 12 (Design and Contingencies - $359,000) 13 (2) Interchange Improvement of I-95 with 14 US 322 Interchange and Local Access, 15 Chester Township 4,800,000 16 (Base Project Allocation - $1,600,000) 17 (Land Allocation - $3,000,000) 18 (Design and Contingencies - $200,000) 19 (3) Widen I-95 and US 322 Ramps, Chester 20 City 4,580,000 21 (Base Project Allocation - $4,000,000) 22 (Land Allocation - $280,000) 23 (Design and Contingencies - $300,000) 24 (4) Installation of Traffic and Incident 25 Management System on I-95 from PA 291 26 to I-476, Ridley and Tinicum Townships, 27 Ridley Park Borough, City of 28 Philadelphia 670,000 29 (Base Project Allocation - $500,000) 30 (Land Allocation - $10,000) 20030H1889B2466 - 19 -
1 (Design and Contingencies - $160,000) 2 (b) SR 252 3 (1) Intersection Improvement on SR 252 4 from Palmers Mill Road to Kirk Lane, 5 Upper Providence Township 3,004,000 6 (Base Project Allocation - $2,352,000) 7 (Land Allocation - $300,000) 8 (Design and Contingencies - $352,000) 9 (c) SR 3009 10 (1) Intersection Improvement of SR 3009, 11 Chichester and Meetinghouse Road, Upper 12 Chichester Township 360,000 13 (Base Project Allocation - $200,000) 14 (Land Allocation - $100,000) 15 (Design and Contingencies - $60,000) 16 Section 324. Elk County. (Reserved) 17 Section 325. Erie County. 18 (a) SR 5 19 (1) Safety and Traffic Flow Improvements 20 to SR 5 (12th Street) from I-79 to 21 Franklin Avenue, Millcreek and Lawrence 22 Park Townships and City of Erie 606,000 23 (Base Project Allocation - $200,000) 24 (Design and Contingencies - $406,000) 25 (b) SR 89 26 (1) Safety and Traffic Flow Improvements 27 to SR 89 from I-79 to Franklin Avenue, 28 Millcreek and Lawrence Park Townships 29 and City of Erie 1,100,000 30 (Base Project Allocation - $800,000) 20030H1889B2466 - 20 -
1 (Land Allocation - $200,000) 2 (Design and Contingencies - $100,000) 3 (c) SR 832 4 (1) Relocation and Reconstruction of SR 5 832, Peninsula Drive, 6th Street to 6 Presque Isle State Park, City of Erie 1,640,000 7 (Base Project Allocation - $1,450,000) 8 (Land Allocation - $170,000) 9 (Design and Contingencies - $20,000) 10 (d) SR 4009 11 (1) Widening and Intersection Improvements 12 to SR 4009, Asbury Road, 12th Street to 13 26th Street, Millcreek Township 800,000 14 (Base Project Allocation - $600,000) 15 (Land Allocation - $100,000) 16 (Design and Contingencies - $100,000) 17 Section 326. Fayette County. 18 (a) SR 21 19 (1) Widen SR 21 from SR 166 Intersection 20 to S&T Drive, German Township 779,000 21 (Base Project Allocation - $160,000) 22 (Land Allocation - $200,000) 23 (Design and Contingencies - $419,000) 24 (2) Widen SR 21 from S&T Drive to Route 25 40, City of Uniontown, South Union and 26 Menallen Townships 6,416,000 27 (Base Project Allocation - $6,000,000) 28 (Land Allocation - $216,000) 29 (Design and Contingencies - $200,000) 30 (b) SR 40 20030H1889B2466 - 21 -
1 (1) Reconstruction of US 40 at Chalk Hill, 2 Wharton Township 410,000 3 (Base Project Allocation - $150,000) 4 (Land Allocation - $120,000) 5 (Design and Contingencies - $140,000) 6 (c) SR 119 7 (1) Restoration of SR 119, Everson Exit to 8 Westmoreland County Line, Bullskin and 9 Upper Tyrone Townships 466,000 10 (Base Project Allocation - $400,000) 11 (Land Allocation - $40,000) 12 (Design and Contingencies - $26,000) 13 (2) Interchange of SR 119, Add Two Ramps 14 at Morgantown Interchange, South Union 15 Township 620,000 16 (Base Project Allocation - $200,000) 17 (Land Allocation - $100,000) 18 (Design and Contingencies - $320,000) 19 (d) SR 711 20 (1) Restoration of SR 711, Connellsville 21 to Chestnut Ridge, Connellsville and 22 Springhill Townships 390,000 23 (Base Project Allocation - $300,000) 24 (Land Allocation - $50,000) 25 (Design and Contingencies - $40,000) 26 Section 327. Forest County. (Reserved) 27 Section 328. Franklin County. 28 (a) I-81 29 (1) Resurface and Rehabilitate I-81 from 30 Exit 10 to Exit 20, Greene and Guilford 20030H1889B2466 - 22 -
1 Townships 2,168,000 2 (Base Project Allocation - $1,568,000) 3 (Land Allocation - $150,000) 4 (Design and Contingencies - $450,000) 5 (2) Reconstruction and Safety Improvements 6 of I-81 and PA 696 Fayette Street 7 Interchange, Southampton Township 600,000 8 (Base Project Allocation - $400,000) 9 (Land Allocation - $100,000) 10 (Design and Contingencies - $100,000) 11 Section 329. Fulton County. (Reserved) 12 Section 330. Greene County. (Reserved) 13 Section 331. Huntingdon County. 14 (a) SR 26 15 (1) Safety Improvement to SR 26 at Jackson 16 Corners, Miller Township 545,000 17 (Base Project Allocation - $290,000) 18 (Land Allocation - $40,000) 19 (Design and Contingencies - $215,000) 20 (2) Safety Improvement, Intersections of 21 SR 26 at Harry's Valley Road and SR 22 1029, Barree Township 2,984,000 23 (Base Project Allocation - $2,860,000) 24 (Land Allocation - $65,000) 25 (Design and Contingencies - $59,000) 26 Section 332. Indiana County. 27 (a) SR 422 28 (1) Reconstruction, Widening, Safety 29 Improvements to SR 422, Armstrong 30 County Line to Cambria County Line 2,600,000 20030H1889B2466 - 23 -
1 (Base Project Allocation - $2,000,000) 2 (Land Allocation - $400,000) 3 (Design and Contingencies - $200,000) 4 Section 333. Jefferson County. (Reserved) 5 Section 334. Juniata County. (Reserved) 6 Section 335. Lackawanna County. 7 (a) I-81 8 (1) Preventive Maintenance, LLTS 9 Interstate 81 in Luzerne and Lackawanna 10 Counties 1,200,000 11 (Base Project Allocation - $1,200,000) 12 Section 336. Lancaster County. 13 (a) SR 41 14 (1) Widen SR 41 to Three Lanes from Truck 15 Climbing Lane to Dutchmans Market, 16 Sadsbury Township 496,000 17 (Base Project Allocation - $233,000) 18 (Land Allocation - $40,000) 19 (Design and Contingencies - $225,000) 20 (2) Add Lane to SR 41 from US-30 to T-942, 21 Salisbury Township 527,000 22 (Base Project Allocation - $385,000) 23 (Land Allocation - $14,000) 24 (Design and Contingencies - $126,000) 25 (b) SR 72 26 (1) Relocation, Reconstruction and Safety 27 Improvements to SR 72, Various 28 Townships 2,600,000 29 (Base Project Allocation - $2,000,000) 30 (Land Allocation - $200,000) 20030H1889B2466 - 24 -
1 (Design and Contingencies - $400,000) 2 (c) SR 272 3 (1) Resurface, Rehabilitate and Paint 4 Bridges on SR 272 from PA 741 to 5 Smithville, West Lampeter, Pequea and 6 Providence Townships 2,089,000 7 (Base Project Allocation - $1,940,000) 8 (Land Allocation - $20,000) 9 (Design and Contingencies - $129,000) 10 (d) SR 441 11 (1) Resurface, Rehabilitate and Paint 12 Bridges on SR 441 Corridor, Columbia 13 Borough and West Hempfield Township 2,220,000 14 (Base Project Allocation - $2,000,000) 15 (Land Allocation - $220,000) 16 (e) SR 1026 17 (1) Reconstruction of SR 1026 from Wallups 18 Hill Road to West of Kline Road, West 19 Cocalico Township 444,000 20 (Base Project Allocation - $184,000) 21 (Land Allocation - $60,000) 22 (Design and Contingencies - $200,000) 23 Section 337. Lawrence County. 24 (a) SR 422 25 (1) Reconstruction of SR 422 from New 26 Castle to Rose Point, Slippery Rock, 27 Shenango and Union Townships 250,000 28 (Design and Contingencies - $250,000) 29 (b) SR 1005 30 (1) Reconstruction of SR 1005 from the 20030H1889B2466 - 25 -
1 Intersection of Maitland Lane to the 2 Mercer County Line, Neshannock and 3 Wilmington Townships 946,000 4 (Base Project Allocation - $636,000) 5 (Land Allocation - $210,000) 6 (Design and Contingencies - $100,000) 7 (c) SR 4014 8 (1) Reconstruction of SR 4014, State 9 Street, New Castle and Union Township 774,000 10 (Base Project Allocation - $536,000) 11 (Land Acquisition - $238,000) 12 Section 338. Lebanon County. 13 (a) SR 422 14 (1) Widen, Reconstruct Associated Roadways 15 and Safety Improvements to US 422 and 16 Lingle Avenue, Palmyra Borough and 17 Derry Township (Dauphin County) 3,000,000 18 (Base Project Allocation - $3,000,000) 19 (b) SR 501 20 (1) Intersection Improvement to SR 501 21 College Street and SR 2011 Richland 22 Avenue Intersection, Myerstown Borough 610,000 23 (Base Project Allocation - $450,000) 24 (Land Allocation - $60,000) 25 (Design and Contingencies - $100,000) 26 (c) SR 4020 27 (1) Update Shoulders, Level and Overlay on 28 SR 4020 from PA 72 to SR 4019 through 29 Fort Indiantown Gap, East Hanover 490,000 30 (Base Construction Allocation - 20030H1889B2466 - 26 -
1 $460,000) 2 (Land Allocation - $10,000) 3 (Design and Contingencies - $20,000) 4 Section 339. Lehigh County. 5 (a) I-78 6 (1) Reconstruction of I-78, Black River 7 Road Bridge Overpass and Saucon Park 8 Bridge, Lower Saucon Township 415,000 9 (Base Project Allocation - $350,000) 10 (Land Allocation - $25,000) 11 (Design and Contingencies - $40,000) 12 Section 340. Luzerne County. 13 (a) SR 1021 14 (1) Construct New Roadway, SR 1021, from 15 the Eight Street Bridge to Interstate 16 Route 81, Jenkins and Pittston 17 Townships 540,000 18 (Base Project Allocation - $400,000) 19 (Land Allocation - $100,000) 20 (Design and Contingencies - $40,000) 21 (b) I-81 22 (1) Interchange Improvement on I-81 at 23 Exit 178, Avoca 700,000 24 (Base Project Allocation - $400,000) 25 (Land Allocation - $100,000) 26 (Design and Contingencies - $200,000) 27 (c) SR 93 28 (1) Restoration and Widening of SR 93 from 29 Rock Glen Road to County Road, 30 Conyngham Borough 300,000 20030H1889B2466 - 27 -
1 (Base Project Allocation - $300,000) 2 Section 341. Lycoming County. 3 (a) SR 220 4 (1) Restoration of SR 220 from Fire Hall 5 to Lycoming Creek Bridges, Woodward 6 Township 2,570,000 7 (Base Project Allocation - $2,500,000) 8 (Design and Contingencies - $70,000) 9 Section 342. McKean County. (Reserved) 10 Section 343. Mercer County. 11 (a) SR 60-01L 12 (1) Signing and Lighting of SR 60 at I-80, 13 Shenango Township 700,000 14 (Base Project Allocation - $400,000) 15 (Design and Contingencies - $300,000) 16 (b) SR 3014 17 (1) Resurface of SR 3014 from Buhl Farm 18 Road to PA 18 (Hermitage Road), City of 19 Hermitage 620,000 20 (Base Project Allocation - $500,000) 21 (Land Acquisition - $100,000) 22 (Design and Contingencies - $20,000) 23 Section 344. Mifflin County. (Reserved) 24 Section 345. Monroe County. 25 (a) I-80 26 (1) Safety Improvements to I-80, Tobyhanna 27 Township 1,240,000 28 (Base Project Allocation - $1,200,000) 29 (Design and Contingencies - $40,000) 30 (b) SR 209 20030H1889B2466 - 28 -
1 (1) Safety and Traffic Flow Improvements 2 to SR 209 in Monroe County from SR 3 209/SR 33 Intersection to Carbon 4 County, Polk, Chestnuthill and Hamilton 5 Townships 800,000 6 (Base Project Allocation - $600,000) 7 (Land Allocation - $100,000) 8 (Design and Contingencies - $100,000) 9 (2) Median Barrier/Safety Improvements to 10 SR 209 from SR 33 and SR 209, 11 Northampton County Line to I-80, 12 Hamilton and Stroud Townships 302,000 13 (Base Project Allocation - $302,000) 14 Section 346. Montgomery County. 15 (a) SR 63 16 (1) Intersection Improvements to SR 63, 17 Welsh Road at Limekiln Pike and 18 Norristown Road, Horsham and Upper 19 Dublin Townships 310,000 20 (Base Project Allocation - $200,000) 21 (Land Allocation - $10,000) 22 (Design and Contingencies - $100,000) 23 (b) SR 73 24 (1) Safety and Intersection Improvements 25 to SR 73, Plank/Otts/Meyers/Seltz 26 Roads: SR 73-Township Line Road, 27 Skippack and Perkiomen Townships 895,000 28 (Base Project Allocation - $520,000) 29 (Land Allocation - $105,000) 30 (Design and Contingencies - $270,000) 20030H1889B2466 - 29 -
1 (c) SR 202 2 (1) Widen to Four Lanes, US 202, Dekalb 3 Pike: Johnson Highway - PA 309, 4 Whitpain and East Norriton Townships 5 and Norristown Borough 11,800,000 6 (Base Project Allocation - $8,800,000) 7 (Land Allocation - $2,800,000) 8 (Design and Contingencies - $200,000) 9 (2) Widen and Intersection Improvements to 10 SR 202 from Swedesford Road to Morris 11 Road, Whitpain Township 5,600,000 12 (Base Project Allocation - $3,600,000) 13 (Land Allocation - $2,000,000) 14 (3) Widen SR 202 from Johnson Highway to 15 Swedesford Road, Norristown Borough, 16 East Norriton and Whitpain Townships 1,520,000 17 (Land Allocation - $1,520,000) 18 (4) Reconstruction and Widen SR 202 from 19 Morris Road To PA 63, Montgomery, Upper 20 and Lower Gwynedd, and Whitpain 21 Townships 4,240,000 22 (Base Project Allocation - $3,000,000) 23 (Land Allocation - $1,240,000) 24 (5) Relocation of SR 202 from Hancock Road 25 to US 309, Lower and Upper Gwynedd 26 Township and Montgomery Township 1,000,000 27 (Base Project Allocation - $1,000,000) 28 (6) Widen and Signalization of SR 202 at 29 Five Points Intersection (PA 309, PA 30 463 and US 202), Montgomery Township 1,020,000 20030H1889B2466 - 30 -
1 (Base Project Allocation - $400,000) 2 (Land Allocation - $620,000) 3 (d) SR 309 4 (1) Reconstruction of SR 309 from Haws 5 Lane to Pennsylvania Avenue, Upper 6 Dublin and Whitemarsh Townships 12,000,000 7 (Base Project Allocation - $12,000,000) 8 (e) SR 363 9 (1) Intersection and Signal Improvements, 10 Sumneytown at SR 363, Valley Forge 11 Road, Towamencin and Upper Gwynedd 12 Township 2,400,000 13 (Base Project Allocation - $2,400,000) 14 (f) SR 422 15 (1) New Interchange, SR 422 at PA 363, 16 West Norriton and Lower Providence 17 Townships 4,400,000 18 (Base Project Allocation - $4,000,000) 19 (Land Allocation - $200,000) 20 (Design and Contingencies - $200,000) 21 (g) SR 463 22 (1) Widen SR 463 (Horsham Road): North 23 Wales Road to General Hancock Road, 24 Montgomery Township 520,000 25 (Base Project Allocation - $520,000) 26 (h) SR 2001 27 (1) Intersection Improvements, SR 2001, 28 Morris Road at North Wales (North and 29 South Leg), Worcester and Whitpain 30 Townships 422,000 20030H1889B2466 - 31 -
1 (Base Project Allocation - $230,000) 2 (Land Allocation - $60,000) 3 (Design and Contingencies - $132,000) 4 (i) SR 2027 5 (1) Intersection Improvements, SR 2027, 6 Pennsylvania Avenue at Camp Hill Road, 7 Springfield Township 1,131,000 8 (Base Project Allocation - $760,000) 9 (Land Allocation - $138,000) 10 (Design and Contingencies - $233,000) 11 (j) SR 3045 12 (1) Corridor Improvements to SR 3045 from 13 Rock Hill Road to Belmont Avenue, Lower 14 Merion Township 1,300,000 15 (Base Project Allocation - $1,300,000) 16 Section 347. Montour County. (Reserved) 17 Section 348. Northampton County. 18 (a) I-78 19 (1) Restoration of I-78, Lower Saucon 20 Township and Bethlehem 665,000 21 (Base Project Allocation - $600,000) 22 (Land Allocation - $25,000) 23 (Design and Contingencies - $40,000) 24 Section 349. Northumberland County. (Reserved) 25 Section 350. Perry County. 26 (a) SR 11 27 (1) Resurface SR 11 from I-81 to Perdix 28 Village, Marysville Borough and Penn 29 Township 575,000 30 (Base Project Allocation - $500,000) 20030H1889B2466 - 32 -
1 (Land Acquisition - $55,000) 2 (Design and Contingencies - $20,000) 3 (b) SR 274 4 (1) Widen and Improve Intersection of SR 5 274 and Friendly Drive, Penn Township 475,000 6 (Base Project Allocation - $475,000) 7 (c) SR 849 8 (1) Reconstruction and Drainage 9 Improvements to SR 849 at Duncannon 10 Subway, Penn Township 540,000 11 (Base Project Allocation - $400,000) 12 (Land Allocation - $100,000) 13 (Design and Contingencies - $40,000) 14 Section 351. Philadelphia County. 15 (a) I-95 16 (1) Reconstruction of I-95, Ann Street to 17 Frankford Creek, City of Philadelphia 6,300,000 18 (Base Project Allocation - $3,500,000) 19 (Land Allocation - $1,000,000) 20 (Design and Contingencies - $1,800,000) 21 (2) Reconstruction and Interchange 22 Improvements to I-95, Frankford Avenue 23 to Orthodox Street, City of 24 Philadelphia 15,600,000 25 (Base Project Allocation - $8,000,000) 26 (Land Allocation - $5,400,000) 27 (Design and Contingencies - $2,200,000) 28 (3) Reconstruction and Interchange 29 Improvements to I-95, Orthodox Street 30 to Levick Street, City of Philadelphia 9,430,000 20030H1889B2466 - 33 -
1 (Base Project Allocation - $7,500,000) 2 (Land Allocation - $800,000) 3 (Design and Contingencies - $1,130,000) 4 (4) Reconstruction and Interchange 5 Improvements to I-95, Levick Street to 6 Bleigh Avenue, City of Philadelphia 12,525,000 7 (Base Project Allocation - $8,500,000) 8 (Land Allocation - $1,025,000) 9 (Design and Contingencies - $3,000,000) 10 (5) Reconstruction and Safety Improvements 11 to I-95, Shackamaxon Street and Ann 12 Street, City of Philadelphia 17,368,000 13 (Base Project Allocation - $12,500,000) 14 (Land Allocation - $1,400,000) 15 (Design and Contingencies - $3,468,000) 16 (6) Reconstruction and Operational 17 Improvements to I-95, Bleigh Avenue to 18 Academy Road, Philadelphia County 6,700,000 19 (Base Project Allocation - $4,000,000) 20 (Land Allocation - $800,000) 21 (Design and Contingencies - $1,900,000) 22 (b) SR 1007 23 (1) Construct New Roadway, Adams Avenue 24 Connector, Torresdale to Aramingo 25 Avenue 656,000 26 (Base Project Allocation - $286,000) 27 (Land Allocation - $10,000) 28 (Design and Contingencies - $360,000) 29 (c) SR 3007 30 (1) Installation of New Roadway Lighting 20030H1889B2466 - 34 -
1 of SR 3007, Benjamin Franklin Parkway 2 from 16th to 25th Street, City of 3 Philadelphia 700,000 4 (Base Project Allocation - $700,000) 5 (d) SR 4007 6 (1) Reconstruction of SR 4007, Germantown 7 Avenue: Allens Lane to Cresheim Valley 8 Drive, City of Philadelphia 960,000 9 (Base Project Allocation - $800,000) 10 (Land Allocation - $80,000) 11 (Design and Contingencies - $80,000) 12 Section 352. Pike County. 13 (a) I-84 14 (1) Restoration of I-84, Wayne County Line 15 to Delaware River Bridge 400,000 16 (Base Project Allocation - $400,000) 17 Section 353. Potter County. 18 (a) SR 6 19 (1) Restoration and Reconstruction of SR 20 6, Main Street, Galeton Borough 650,000 21 (Base Project Allocation - $500,000) 22 (Land Allocation - $90,000) 23 (Design and Contingencies - $60,000) 24 Section 354. Schuylkill County. 25 (a) I-81 26 (1) Restoration and Safety Improvements to 27 I-81, Lebanon County to Luzerne County 640,000 28 (Base Project Allocation - $600,000) 29 (Design and Contingencies - $40,000) 30 Section 355. Snyder County. 20030H1889B2466 - 35 -
1 (a) SR 11 2 (1) Restoration of SR 11, Selinsgrove 3 Bypass, Monroe, Penn, Selinsgrove and 4 Union Townships 966,000 5 (Base Project Allocation - $840,000) 6 (Design and Contingencies - $126,000) 7 (b) SR 15 8 (1) Wetland Mitigation Site for SR 15, 9 Central Susquehanna Valley 10 Transportation Project, Monroe and 11 Shamokin Dam Townships 350,000 12 (Base Project Allocation - $200,000) 13 (Land Allocation - $50,000) 14 (Design and Contingencies - $100,000) 15 Section 356. Somerset County. 16 (a) SR 219 17 (1) New 4-lane Roadway on SR 219 from 18 Meyersdale Bypass to Maryland State 19 Line, Salisbury Borough, Elk Lick and 20 Summit Townships 32,085,000 21 (Base Project Allocation - $28,000,000) 22 (Land Allocation - $1,000,000) 23 (Design and Contingencies - $3,085,000) 24 Section 357. Sullivan County. 25 (a) SR 220 26 (1) Reconstruction of SR 220 from SR 42 in 27 Muncy Valley to Sonestown, Davidson 28 Township 790,000 29 (Base Project Allocation - $700,000) 30 (Land Allocation - $30,000) 20030H1889B2466 - 36 -
1 (Design and Contingencies - $60,000) 2 Section 358. Susquehanna County. 3 (a) I-81 4 (1) Preventative Maintenance on I-81, 5 Great Bend and New Milford Townships 350,000 6 (Base Project Allocation - $350,000) 7 (b) SR 706 8 (1) Reconstruction of SR 706 from Fairdale 9 to West Montrose, Jessup and 10 Bridgewater Townships 305,000 11 (Base Project Allocation - $300,000) 12 (Land Allocation - $5,000) 13 (2) Reconstruction of SR 706, Montrose to 14 Tiffany Montrose Borough, Bridgewater 15 Township 300,000 16 (Base Project Allocation - $300,000) 17 (3) Reconstruction of SR 706 from Tiffany 18 to US 11, Bridgewater and New Milford 19 Townships 460,000 20 (Base Project Allocation - $400,000) 21 (Land Allocation - $20,000) 22 (Design and Contingencies - $40,000) 23 (4) Reconstruction of SR 706 and SR 3023, 24 Rush Township 400,000 25 (Base Project Allocation - $400,000) 26 Section 359. Tioga County. (Reserved) 27 Section 360. Union County. (Reserved) 28 Section 361. Venago County. (Reserved) 29 Section 362. Warren County. (Reserved) 30 Section 363. Washington County. 20030H1889B2466 - 37 -
1 (a) SR 18 2 (1) Intersection Improvement to SR 18/SR 3 4008 Intersections, Burgettstown 4 Borough 390,000 5 (Base Project Allocation - $30,000) 6 (Land Allocation - $210,000) 7 (Design and Contingencies - $150,000) 8 (b) I-79 9 (1) Restoration of I-79, SR 40 to I-70/I- 10 79 Interchange, Amwell and South 11 Strabane 615,000 12 (Base Project Allocation - $315,000) 13 (Land Allocation - $100,000) 14 (Design and Contingencies - $200,000) 15 (c) SR 88 16 (1) Intersection Improvement of SR 88/SR 17 1006 Intersection, Finleyville 390,000 18 (Base Project Allocation - $90,000) 19 (Land Allocation - $220,000) 20 (Design and Contingencies - $80,000) 21 (2) Add Lane and Signal Improvement to SR 22 88 at Intersection of SR 88 and SR 837, 23 Carroll Township 349,000 24 (Base Project Allocation - $80,000) 25 (Land Allocation - $85,000) 26 (Design and Contingencies - $184,000) 27 (d) SR 136 28 (1) Restoration and Safety Improvements to 29 SR 136, Various Curves Near 30 Monongahela, Carroll Township 300,000 20030H1889B2466 - 38 -
1 (Base Project Allocation - $100,000) 2 (Land Allocation - $100,000) 3 (Design and Contingencies - $100,000) 4 (2) Intersection Improvement of SR 136 at 5 SR 917 and SR 1087, Carroll and 6 Fallowfield Townships 545,000 7 (Base Project Allocation - $95,000) 8 (Land Allocation - $250,000) 9 (Design and Contingencies - $200,000) 10 (3) Intersection Improvement of SR 11 136/1055 Intersection, Somerset 12 Township 645,000 13 (Base Project Allocation - $95,000) 14 (Land Allocation - $350,000) 15 (Design and Contingencies - $200,000) 16 (e) SR 519 17 (1) Intersection Improvement at SR 519/ 18 1055 Intersection, North Strabane 19 Township 600,000 20 (Base Project Allocation - $150,000) 21 (Land Allocation - $250,000) 22 (Design and Contingencies - $200,000) 23 (2) Signal Improvement and Channelization 24 of SR 519 at Intersection of SR 519 at 25 980 and 19 South-bound ramps, North 26 Strabane Township 300,000 27 (Base Project Allocation - $100,000) 28 (Land Allocation - $100,000) 29 (Design and Contingencies - $100,000) 30 (f) SR 980 20030H1889B2466 - 39 -
1 (1) Intersection Improvement at SR 980, 2 South Approach to PA 50, Cecil 3 Township 395,000 4 (Base Project Allocation - $200,000) 5 (Land Allocation - $85,000) 6 (Design and Contingencies - $110,000) 7 (g) SR 2040 8 (1) Restoration of SR 2044, 2023 and 8030 9 Near I-70 Interchange, Bentleyville 10 Borough 300,000 11 (Base Project Allocation - $300,000) 12 (2) Add Turning Lane to SR 2040 Between 13 Pittsburgh Street and I-70, 14 Bentleyville Borough and Somerset 15 Township 500,000 16 (Base Project Allocation - $100,000) 17 (Land Allocation - $200,000) 18 (Design and Contingencies - $200,000) 19 (h) SR 8013 20 (1) Interchange Improvement of SR 8013 at 21 I-79 to SR 1047, Chartiers Township 995,000 22 (Base Project Allocation - $600,000) 23 (Land Allocation - $65,000) 24 (Design and Contingencies - $330,000) 25 Section 364. Wayne County. (Reserved) 26 Section 365. Westmoreland County. 27 (a) SR 30 28 (1) Widening and Safety Improvements to SR 29 30 from Irwin Turnpike to the Allegheny 30 County Line, North Huntingdon 1,200,000 20030H1889B2466 - 40 -
1 (Base Project Allocation - $1,000,000) 2 (Land Allocation - $100,000) 3 (Design and Contingencies - $100,000) 4 (2) Intersection Improvement to SR 30/981, 5 Intersection Latrobe Airport, Unity 6 Township 2,400,000 7 (Base Project Allocation - $800,000) 8 (Land Allocation - $1,100,000) 9 (Design and Contingencies - $500,000) 10 (b) I-70 11 (1) Interchange Improvement, I-70, New 12 Stanton Borough 1,900,000 13 (Base Project Allocation - $1,500,000) 14 (Land Allocation - $250,000) 15 (Design and Contingencies - $150,000) 16 (c) SR 119 17 (1) Reconstruction and Interchange 18 Improvement to SR 119, Sony 19 Interchange, Westmoreland County 1,520,000 20 (Base Project Allocation - $1,200,000) 21 (Land Allocation - $120,000) 22 (Design and Contingencies - $200,000) 23 (d) SR 130 24 (1) Restoration of SR 130 from SR 4002 to 25 Toll 66, Hempfield Township 530,000 26 (Base Project Allocation - $500,000) 27 (Land Allocation - $5,000) 28 (Design and Contingencies - $25,000) 29 (2) Intersection Improvement, SR 130 30 Improvements, Penn Township 350,000 20030H1889B2466 - 41 -
1 (Land Allocation - $150,000) 2 (Design and Contingencies - $200,000) 3 (3) Intersection Improvement of SR 130 at 4 Pleasant Valley Road Intersection, Penn 5 Township 550,000 6 (Base Project Allocation - $100,000) 7 (Land Allocation - $250,000) 8 (Design and Contingencies - $200,000) 9 (e) SR 366 10 (1) Signal and Safety Improvement to SR 11 366 from 56 to Tarentum Bridge: North 12 from SR 56 LA Murrysville, New 13 Kensington and Washington Townships 1,200,000 14 (Base Project Allocation - $600,000) 15 (Land Allocation - $250,000) 16 (Design and Contingencies - $350,000) 17 (f) SR 1045 18 (1) Two Lane Relocation of SR 1045 at St. 19 Vincent College, Unity Township 1,125,000 20 (Base Project Allocation - $600,000) 21 (Land Allocation - $125,000) 22 (Design and Contingencies - $400,000) 23 Section 366. Wyoming County. 24 (a) SR 6 25 (1) Restoration and Resurfacing of SR 6, 26 Meshoppen Township 560,000 27 (Base Project Allocation - $560,000) 28 Section 367. York County. 29 (a) SR 30 30 (1) Widening and Intersection Improvements 20030H1889B2466 - 42 -
1 to SR 30, Realignment of a Portion of 2 Eden Road at Intersection of US 30 and 3 Eden Road, Springettsbury Township 1,000,000 4 (Base Project Allocation - $1,000,000) 5 (b) SR 74 6 (1) Safety Improvement to SR 74 from 7 Maryland Line to Red Lion Borough, 8 Various Townships 1,200,000 9 (Base Project Allocation - $1,000,000) 10 (Land Allocation - $100,000) 11 (Design and Contingencies - $100,000) 12 (2) Realignment of SR 74 from High Street 13 and Sunset Lane, West Manchester 14 Township 440,000 15 (Base Project Allocation - $200,000) 16 (Land Allocation - $220,000) 17 (Design and Contingencies - $20,000) 18 (c) I-83 19 (1) Interchange and Safety Improvements to 20 I-83, Exits 6, 7 and 8, Various 21 Municipalities 1,490,000 22 (Base Project Allocation - $1,050,000) 23 (Land Allocation - $200,000) 24 (Design and Contingencies - $240,000) 25 (2) Resurface and Ramp Improvements to I- 26 83 from Maryland to PA 214, Hopewell, 27 Shrewsbury and Springfield Townships 824,000 28 (Base Project Allocation - $739,000) 29 (Land Allocation - $60,000) 30 (Design and Contingencies - $25,000) 20030H1889B2466 - 43 -
1 (3) Resurface and Ramp Improvements to I- 2 83 from Exit 4 to Exit 5, Spring 3 Garden, York 7,131,000 4 (Base Project Allocation - $6,200,000) 5 (Land Allocation - $500,000) 6 (Design and Contingencies - $431,000) 7 (d) SR 94 8 (1) Widen SR 94 from Kuhn Drive to Appler 9 Road, Various Municipalities 2,440,000 10 (Base Project Allocation - $1,500,000) 11 (Land Allocation - $501,000) 12 (Design and Contingencies - $439,000) 13 (e) SR 116 14 (1) Realign Intersection of SR 116 at 15 York, Jefferson and Lehman Streets, 16 North Codorus Township 370,000 17 (Base Project Allocation - $160,000) 18 (Land Allocation - $60,000) 19 (Design and Contingencies - $150,000) 20 (f) SR 124 21 (1) Reconstruct and Widen SR 124, Mt. Rose 22 Avenue from Haines Road to Edgewood 23 Road, Springettsbury Township 539,000 24 (Base Project Allocation - $400,000) 25 (Land Allocation - $100,000) 26 (Design and Contingencies - $39,000) 27 (g) SR 2011 28 (1) Reconstruct and Realign SR 2011 from 29 Nursery Road to Mt. Pisgah Road, Hellam 30 and Lower Windsor Township 1,320,000 20030H1889B2466 - 44 -
1 (Base Project Allocation - $1,000,000) 2 (Land Allocation - $170,000) 3 (Design and Contingencies - $150,000) 4 (h) SR 4001 5 (1) Curve Realignment of SR 4001, 6 Greenbriar Road to Church Road, 7 Manchester and West Manchester 8 Townships 454,000 9 (Base Project Allocation - $269,000) 10 (Land Allocation - $35,000) 11 (Design and Contingencies - $150,000) 12 CHAPTER 5 13 MISCELLANEOUS PROVISIONS 14 Section 501. Federal funds. 15 All moneys received from the Federal Government for the 16 construction of the projects specifically itemized in this act 17 are also hereby appropriated for those projects. 18 Section 502. Allocation of funds. 19 Whenever as determined by the Department of Transportation 20 that the full estimated financial costs of the projects itemized 21 in this act are not necessary for the proper design, acquisition 22 or construction of such projects, the excess funds no longer 23 required may be allocated by the Pennsylvania Department of 24 Transportation to increase the estimated costs of any one or 25 more of the projects specifically itemized in a capital budget. 26 Section 503. Estimated useful life. 27 The General Assembly states that the estimated useful life of 28 the highway capital projects itemized in this act is 30 years. 29 Section 504. Effective date. 30 This act shall take effect immediately. F14L72RZ/20030H1889B2466 - 45 -