AN ACT

 

1Providing for the capital budget for fiscal year 2014-2015;
2itemizing public improvement projects, furniture and
3equipment projects, transportation assistance projects,
4redevelopment assistance capital projects, flood control
5projects, Keystone Recreation, Park and Conservation Fund
6projects, Environmental Stewardship Fund projects and State
7forestry bridge projects to be constructed, acquired or
8assisted by the Department of General Services, the
9Department of Community and Economic Development, the
10Department of Conservation and Natural Resources, the
11Department of Environmental Protection or the Department of
12Transportation, together with their estimated financial
13costs; authorizing the incurring of debt without the approval
14of the electors for the purpose of financing the projects to
15be constructed, acquired or assisted by the Department of
16General Services, the Department of Community and Economic
17Development, the Department of Conservation and Natural
18Resources, the Department of Environmental Protection or the
19Department of Transportation; stating the estimated useful
20life of the projects; and providing for an exemption and for
21limitation on certain capital projects.

22The General Assembly of the Commonwealth of Pennsylvania
23hereby enacts as follows:

24Section 1. Short title.

25This act shall be known and may be cited as the Capital
26Budget Project Itemization Act of 2014-2015.

27Section 2. Total authorizations.

28(a) Public improvements.--The total authorization for the

1additional capital projects in the category of public
2improvement projects itemized in section 3 and to be acquired or
3constructed by the Department of General Services, its
4successors or assigns, and to be financed by the incurring of
5debt shall be $565,191,000.

6(b) Furniture and equipment.--The total authorization for
7the additional capital projects in the category of public
8improvement projects consisting of the acquisition of original
9movable furniture and equipment to complete public improvement
10projects itemized in section 4 and to be acquired by the
11Department of General Services, its successors or assigns, and
12to be financed by the incurring of debt shall be $1,600,000.

13(c) Transportation assistance.--The total authorization for
14the capital projects in the category of transportation
15assistance projects itemized in section 5 with respect to which
16an interest is to be acquired in or constructed by the
17Department of Transportation, its successors or assigns, and to
18be financed by the incurring of debt shall be $451,893,000.

19(d) Redevelopment assistance.--The total authorization for 
20the capital projects in the category of redevelopment assistance 
21capital projects itemized in section 6 for capital grants by the 
22Department of Community and Economic Development, its successors 
23or assigns, and to be financed by the incurring of debt, shall 
24be $787,027,000.

25(e) Flood control.--The total authorization for the capital
26projects in the category of flood control projects itemized in
27section 7 and to be constructed by the Department of
28Environmental Protection, its successors or assigns, and to be
29financed by the incurring of debt, shall be $48,205,000.

30(f) Keystone Recreation, Park and Conservation Fund.--The

1total authorization for the capital projects in the category of
2public improvement projects itemized in section 8 and to be
3constructed by the Department of Conservation and Natural
4Resources, its successors or assigns, and to be financed from
5current revenues in the Keystone Recreation, Park and
6Conservation Fund shall be $20,015,000.

7(g) Environmental Stewardship Fund current revenue
8projects.--The total authorization for the capital projects in
9the category of public improvement projects itemized in section
109 to be acquired or developed by the Department of Conservation
11and Natural Resources and to be financed by current revenues of
12the Environmental Stewardship Fund under executive authorization
13shall be $7,740,000.

14(h) State forestry bridge projects.--The total authorization
15for the capital projects itemized in section 10 to be
16constructed by the Department of Conservation and Natural
17Resources, its successors or assigns, and to be financed by oil
18company franchise tax revenues under 75 Pa.C.S. § 9502(a)(2)(iv)
19(relating to imposition of tax) shall be $3,750,000.

20(i) Motor License Fund current revenue projects.--The total
21authorization for the capital projects in the category of public
22improvement projects itemized in section 11 to be acquired or
23developed by the Department of Transportation and to be financed
24by current revenues of the Motor License Fund pursuant to
25executive authorization shall be $407,500,000.

26Section 3. Itemization of public improvement capital projects.

27Additional capital projects in the category of public
28improvement projects to be constructed or acquired by the
29Department of General Services, its successors or assigns, and
30to be financed by the incurring of debt, are hereby itemized,

1together with their respective estimated financial costs, as
2follows:

3 

4Project

Total Project

Allocation

5(1) Department of Agriculture

 

6(i) Farm Show Complex

 

7(A) Provide for maintenance and upgrades
8to various sections of the Farm Show
9Complex

 

10Project Allocation

14,000,000

11(Base Project Allocation -
12$12,600,000)

 

13(Design & Contingencies - $1,400,000)

 

14(2) Department of Conservation and Natural
15Resources

 

16(i) Washington Crossing Historic Park

 

17(A) Construction and infrastructure
18improvements to comply with State Park
19standards

 

20Project Allocation

5,000,000

21(Base Project Allocation - $5,000,000)

 

22(3) Department of Corrections

 

23(i) State Correctional Institution at Albion

 

24(A) Replace all institutional cameras and
25system components and add cameras

 

26Project Allocation

1,875,000

27(Base Project Allocation - $1,500,000)

 

28(Design & Contingencies - $375,000)

 

29(B) Renovate or replace the institution's
30chilled water system, including

 

1chillers, cooling towers and other
2system components

 

3Project Allocation

1,875,000

4(Base Project Allocation - $1,500,000)

 

5(Design & Contingencies - $375,000)

 

6(ii) State Correctional Institution at
7Cambridge Springs

 

8(A) Replace current fire alarm system

 

9Project Allocation

1,250,000

10(Base Project Allocation - $1,000,000)

 

11(Design & Contingencies - $250,000)

 

12(iii) State Correctional Institution at Camp
13Hill

 

14(A) Install new gravity flow sewer lines
15and remove pumping systems

 

16Project Allocation

931,000

17(Base Project Allocation - $745,000)

 

18(Design & Contingencies - $186,000)

 

19(B) Construct replacement water
20purification plant

 

21Project Allocation

12,750,000

22(Base Project Allocation -
23$10,200,000)

 

24(Design & Contingencies - $2,550,000)

 

25(iv) State Correctional Institution at Forest

 

26(A) Renovate and paint the institution's
27water tower

 

28Project Allocation

575,000

29(Base Project Allocation - $460,000)

 

30(Design & Contingencies - $115,000)

 

1(B) Replace power inverter systems in
2various buildings

 

3Project Allocation

875,000

4(Base Project Allocation - $700,000)

 

5(Design & Contingencies - $175,000)

 

6(v) State Correctional Institution at Muncy

 

7(A) Replace automatic temperature
8controls for heating and air
9conditioning systems in various
10buildings

 

11Project Allocation

750,000

12(Base Project Allocation - $600,000)

 

13(Design & Contingencies - $150,000)

 

14(B) Construct new diagnostic
15classification center equipped with
16inmate cells, a medical section,
17psychology group area and feeding
18areas

 

19Project Allocation

27,500,000

20(Base Project Allocation -
21$22,000,000)

 

22(Design & Contingencies - $5,500,000)

 

23(vi) State Correctional Institution at Pine
24Grove

 

25(A) Provide for additional cameras and
26equipment

 

27Project Allocation

475,000

28(Base Project Allocation - $380,000)

 

29(Design & Contingencies - $95,000)

 

30(vii) State Correctional Institution at

 

1Waymart

 

2(A) Replace HVAC system in C Block and
3install independent controls

 

4Project Allocation

3,750,000

5(Base Project Allocation - $3,000,000)

 

6(Design & Contingencies - $750,000)

 

7(B) Replace HVAC system in Building No.1
8and install independent controls

 

9Project Allocation

2,500,000

10(Base Project Allocation - $2,000,000)

 

11(Design & Contingencies - $500,000)

 

12(4) Department of Education

 

13(i) Lincoln University

 

14(A) Renovate the Manuel Rivero Gymnasium

 

15Project Allocation

30,000,000

16(Base Project Allocation -
17$24,000,000)

 

18(Design & Contingencies - $6,000,000)

 

19(ii) The Pennsylvania State University

 

20(A) Rehabilitate the Hosler Building

 

21Project Allocation

42,000,000

22(Base Project Allocation -
23$35,000,000)

 

24(Design & Contingencies - $7,000,000)

 

25(B) Construction, infrastructure,
26redevelopment, renovation and related
27costs for pedestrian safety, public
28improvements, campus security upgrades
29and flood control improvements at Penn
30State Hershey Medical Center

 

1Project Allocation

25,000,000

2(Base Project Allocation -
3$25,000,000)

 

4(C) Construction, acquisition,
5redevelopment, renovation and related
6costs for student pedestrian safety,
7infrastructure improvements, campus
8security upgrades and flood control
9improvements to Pennsylvania State
10University Harrisburg Campus

 

11Project Allocation

20,000,000

12(Base Project Allocation -
13$20,000,000)

 

14(iii) Temple University

 

15(A) Purchase the old William Penn High
16School property for future growth

 

17Project Allocation

10,000,000

18(Base Project Allocation - $5,000,000)

 

19(Land Allocation - $4,000,000)

 

20(Design & Contingencies - $1,000,000)

 

21(iv) Thaddeus Stevens College of Technology

 

22(A) Expand the technology center to meet
23current and future demands

 

24Project Allocation

5,000,000

25(Base Project Allocation - $4,400,000)

 

26(Design & Contingencies - $600,000)

 

27(v) University of Pittsburgh

 

28(A) Provide for continued maintenance and
29upgrades on all campuses

 

30Project Allocation

20,000,000

1(Base Project Allocation -
2$16,000,000)

 

3(Design & Contingencies - $4,000,000)

 

4(B) Construction, infrastructure,
5redevelopment and other related costs
6for Hillman Library renovation

 

7Project Allocation

15,000,000

8(Base Project Allocation -
9$15,000,000)

 

10(C) Construction, infrastructure,
11redevelopment, renovation and other
12related costs for Schenley Quadrangle

 

13Project Allocation

20,000,000

14(Base Project Allocation -
15$20,000,000)

 

16(D) Construction, infrastructure,
17redevelopment, renovation and other
18related costs for new building

 

19Project Allocation

50,000,000

20(Base Project Allocation -
21$50,000,000)

 

22(E) Construction, infrastructure,
23redevelopment, renovation and other
24related costs for deferred maintenance

 

25Project Allocation

20,000,000

26(Base Project Allocation -
27$20,000,000)

 

28(F) Construction, infrastructure,
29redevelopment, renovation and other
30related costs for energy conservation

 

1initiatives

 

2Project Allocation

10,000,000

3(Base Project Allocation -
4$10,000,000)

 

5(G) Construction, infrastructure,
6redevelopment, renovation and other
7related costs for Clapp, Langley and
8Crawford Complex

 

9Project Allocation

25,000,000

10(Base Project Allocation -
11$25,000,000)

 

12(H) University of Pittsburgh, Bradford
13Campus renovation and infrastructure
14upgrades to Hanley Library

 

15Project Allocation

25,000,000

16(Base Project Allocation -
17$25,000,000)

 

18(5) Pennsylvania Emergency Management Agency

 

19(i) State Fire Academy

 

20(A) Expand facility, including training
21space for unconventional gas drilling,
22props and gear parking and a memorial
23to fallen firefighters

 

24Project Allocation

5,000,000

25(Base Project Allocation - $4,000,000)

 

26(Land Allocation - $500,000)

 

27(Design & Contingencies - $500,000)

 

28(ii) Western Area office building

 

29(A) Demolish current facility and
30construct new facility to meet current

 

1needs

 

2Project Allocation

3,350,000

3(Base Project Allocation - $3,000,000)

 

4(Design & Contingencies - $350,000)

 

5(6) Department of Environmental Protection

 

6(i) Bradford County

 

7(A) Provide additional funding for DGS
8Project 181-26

 

9Project Allocation

1,875,000

10(Base Project Allocation - $1,500,000)

 

11(Design & Contingencies - $375,000)

 

12(ii) Butler County

 

13(A) Provide additional funding for DGS
14Project 183-21

 

15Project Allocation

3,125,000

16(Base Project Allocation - $2,500,000)

 

17(Design & Contingencies - $625,000)

 

18(iii) Clearfield County

 

19(A) Provide additional funding for DGS
20Project 182-14

 

21Project Allocation

3,125,000

22(Base Project Allocation - $2,500,000)

 

23(Design & Contingencies - $625,000)

 

24(B) Provide additional funding for DGS
25Project 182-22

 

26Project Allocation

1,875,000

27(Base Project Allocation - $1,500,000)

 

28(Design & Contingencies - $375,000)

 

29(C) Provide additional funding for Orrs
30Run flood protection

 

1Project Allocation

1,875,000

2(Base Project Allocation - $1,500,000)

 

3(Design & Contingencies - $375,000)

 

4(iv) Lycoming County

 

5(A) Provide additional funding for
6Loyalsock Creek flood protection

 

7Project Allocation

6,250,000

8(Base Project Allocation - $5,000,000)

 

9(Design & Contingencies - $1,250,000)

 

10(v) Luzerne County

 

11(A) Provide additional funding for DGS
12Project 181-20

 

13Project Allocation

600,000

14(Base Project Allocation - $500,000)

 

15(Design & Contingencies - $100,000)

 

16(B) Provide flood protection for the town
17of Duryea, including rehabilitating
18the levee as well as watershed and
19channel improvements

 

20Project Allocation

4,000,000

21(Base Project Allocation - $3,200,000)

 

22(Design & Contingencies - $800,000)

 

23(vi) McKean County

 

24(A) Provide additional funding for DGS
25Project 182-10

 

26Project Allocation

6,875,000

27(Base Project Allocation - $5,500,000)

 

28(Design & Contingencies - $1,375,000)

 

29(vii) Northumberland County

 

30(A) Provide additional funding for DGS

 

1Project 182-19

 

2Project Allocation

1,875,000

3(Base Project Allocation - $1,500,000)

 

4(Design & Contingencies - $375,000)

 

5(viii) Tioga County

 

6(A) Provide additional funding for Camp
7Brook flood protection

 

8Project Allocation

6,250,000

9(Base Project Allocation - $5,000,000)

 

10(Design & Contingencies - $1,250,000)

 

11(7) Department of General Services

 

12(i) Dauphin County

 

13(A) Provide additional funding for DGS
14Project 948-81, Capitol Complex
15rehabilitation

 

16Project Allocation

5,000,000

17(Base Project Allocation - $4,000,000)

 

18(Design & Contingencies - $1,000,000)

 

19(B) Repair spalling concrete tunnel
20ceilings in the steam tunnels leading
21from the North Office Building to the
22South Office Building and the Central
23Plant

 

24Project Allocation

2,200,000

25(Base Project Allocation - $2,000,000)

 

26(Design & Contingencies - $200,000)

 

27(C) Replace existing interior lighting
28control system at the Keystone
29Building

 

30Project Allocation

385,000

1(Base Project Allocation - $350,000)

 

2(Design & Contingencies - $35,000)

 

3(D) Replace four generators located at
4the P2 level of the East Wing of the
5Capitol Complex

 

6Project Allocation

2,200,000

7(Base Project Allocation - $2,000,000)

 

8(Design & Contingencies - $200,000)

 

9(E) Renovate boiler 3 at the DGS Annex
10Central Plant

 

11Project Allocation

650,000

12(Base Project Allocation - $550,000)

 

13(Design & Contingencies - $100,000)

 

14(F) Renovations and repairs to the
15Arsenal Building

 

16Project Allocation

4,000,000

17(Base Project Allocation - $4,000,000)

 

18(G) Life/Safety upgrades at Labor and
19Industry Building

 

20Project Allocation

2,000,000

21(Base Project Allocation - $2,000,000)

 

22(H) Life/Safety upgrades at Health and
23Welfare Building

 

24Project Allocation

2,000,000

25(Base Project Allocation - $2,000,000)

 

26(I) Interior renovations within the East
27Wing Building

 

28Project Allocation

2,000,000

29(Base Project Allocation - $2,000,000)

 

30(8) Pennsylvania Historical and Museum

 

1Commission

 

2(i) State Archives Building

 

3(A) Acquire and renovate off-site
4building and renovate current site

 

5Project Allocation

30,000,000

6(Base Project Allocation -
7$30,000,000)

 

8(9) Department of Military and Veterans Affairs

 

9(i) Berks Readiness Center, Berks County

 

10(A) Provide for acquisition of land for
11new readiness center in Berks County

 

12Project Allocation

2,000,000

13(Land Allocation - $2,000,000)

 

14(ii) Bucks Readiness Center, Bucks County

 

15(A) Provide for acquisition of land for
16new readiness center in Bucks County

 

17Project Allocation

3,500,000

18(Land Allocation - $3,500,000)

 

19(iii) Eastern Central Readiness Center,
20various counties

 

21(A) Provide for acquisition of land for
22new readiness center in Carbon County
23or Schuylkill County

 

24Project Allocation

2,000,000

25(Land Allocation - $2,000,000)

 

26(iv) East North East Readiness Center,
27various counties

 

28(A) Provide for acquisition of land for
29new readiness center in Lehigh County
30or Northampton County

 

1Project Allocation

3,000,000

2(Land Allocation - $3,000,000)

 

3(v) Northeastern Readiness Center, various
4counties

 

5(A) Provide for acquisition of land for
6new readiness center in Bradford
7County, Luzerne County or Wyoming
8County

 

9Project Allocation

2,000,000

10(Land Allocation - $2,000,000)

 

11(vi) Western Readiness Center, various
12counties

 

13(A) Provide for acquisition of land for
14new readiness center in Allegheny
15County, Armstrong County or Butler
16County

 

17Project Allocation

2,000,000

18(Land Allocation - $2,000,000)

 

19(vii) West Northwest Readiness Center,
20various counties

 

21(A) Provide for acquisition of land for
22new readiness center in Lawrence
23County or Mercer County

 

24Project Allocation

2,000,000

25(Land Allocation - $2,000,000)

 

26(10) Department of Public Welfare

 

27(i) Clarks Summit State Hospital

 

28(A) Install new water line from
29chlorination building to two
30reservoirs

 

1Project Allocation

1,800,000

2(Base Project Allocation - $1,440,000)

 

3(Design & Contingencies - $360,000)

 

4(B) Upgrade current wastewater treatment
5plan

 

6Project Allocation

5,000,000

7(Base Project Allocation - $4,000,000)

 

8(Design & Contingencies - $1,000,000)

 

9(ii) Ebensburg Center

 

10(A) Replace water lines throughout
11facility

 

12Project Allocation

1,500,000

13(Base Project Allocation - $1,200,000)

 

14(Design & Contingencies - $300,000)

 

15(B) Install automatic electrical main
16switching system to existing
17facility's back-up generator system

 

18Project Allocation

2,000,000

19(Base Project Allocation - $1,600,000)

 

20(Design & Contingencies - $400,000)

 

21(iii) Loysville Youth Development Center

 

22(A) Replace existing fixtures and shutoff
23valves and add new hydrants throughout
24campus

 

25Project Allocation

700,000

26(Base Project Allocation - $560,000)

 

27(Design & Contingencies - $140,000)

 

28(iv) North Central Secure Treatment Unit

 

29(A) Replace flat rubber roof at facility

 

30Project Allocation

500,000

1(Base Project Allocation - $400,000)

 

2(Design & Contingencies - $100,000)

 

3(v) Polk Center

 

4(A) Replace elevators and controls in
5residential buildings

 

6Project Allocation

800,000

7(Base Project Allocation - $640,000)

 

8(Design & Contingencies - $160,000)

 

9(vi) Selinsgrove Center

 

10(A) Replace elevators and controls
11throughout facility

 

12Project Allocation

500,000

13(Base Project Allocation - $400,000)

 

14(Design & Contingencies - $100,000)

 

15(vii) South Mountain Secure Treatment Unit

 

16(A) Refurbish existing gymnasium shell,
17including HVAC and infrastructure

 

18Project Allocation

500,000

19(Base Project Allocation - $400,000)

 

20(Design & Contingencies - $100,000)

 

21(B) Replace current electrical
22distribution equipment, including
23panels, substations and switches

 

24Project Allocation

4,000,000

25(Base Project Allocation - $3,200,000)

 

26(Design & Contingencies - $800,000)

 

27(viii) Torrance State Hospital

 

28(A) Replace water filtration system and
29water treatment facility

 

30Project Allocation

6,000,000

1(Base Project Allocation - $4,800,000)

 

2(Design & Contingencies - $1,200,000)

 

3(ix) Warren State Hospital

 

4(A) Install HVAC

 

5Project Allocation

6,000,000

6(Base Project Allocation - $4,800,000)

 

7(Design & Contingencies - $1,200,000)

 

8(x) Wernersville State Hospital

 

9(A) Replace roofs on various buildings

 

10Project Allocation

2,500,000

11(Base Project Allocation - $2,000,000)

 

12(Design & Contingencies - $500,000)

 

13(xi) White Haven Center

 

14(A) Replace single-pane windows with
15energy-efficient windows on various
16buildings

 

17Project Allocation

2,500,000

18(Base Project Allocation - $2,000,000)

 

19(Design & Contingencies - $500,000)

 

20(11) Pennsylvania State Police

 

21(i) Reading Headquarters, Berks County

 

22(A) Design and construct new headquarters
23facility

 

24Project Allocation

11,450,000

25(Base Project Allocation - $8,500,000)

 

26(Land Allocation - $1,000,000)

 

27(Design & Contingencies - $1,950,000)

 

28(ii) Lancaster Headquarters, Lancaster County

 

29(A) Design and construct new headquarters
30facility

 

1Project Allocation

15,325,000

2(Base Project Allocation -
3$12,225,000)

 

4(Land Allocation - $1,000,000)

 

5(Design & Contingencies - $2,100,000)

 

6Section 4. Itemization of furniture and equipment projects.

7Additional capital projects in the category of public
8improvement projects consisting of the acquisition of movable
9furniture and equipment to complete public improvement projects
10and to be purchased by the Department of General Services, its
11successors or assigns, and to be financed by the incurring of
12debt are hereby itemized, together with their estimated
13financial cost, as follows:

14 

15Project

Total Project

Allocation

16(1) Department of Education

 

17(i) University of Pittsburgh

 

18(A) Provide original furniture and
19equipment to deferred maintenance
20Phase VIII

 

21Project Allocation

1,600,000

22(Base Project Allocation - $1,600,000)

 

23Section 5. Itemization of transportation assistance projects.

24(a) Mass transit.--Additional capital projects in the
25category of transportation assistance projects for mass transit
26in which an interest is to be acquired or constructed by the
27Department of Transportation, its successors or assigns, and to
28be financed by the incurring of debt are hereby itemized,
29together with their estimated financial costs, as follows:

30 

 

1Project

Total Project




Allocation

2(1) Beaver County Transportation Authority

 

3(A) Construct CNG fueling station and
4renovate maintenance facility

 

5Project Allocation

574,000

6(Base Project Allocation - $517,000)

 

7(Design & Contingencies - $57,000)

 

8(2) Berks Area Reading Transportation Authority

 

9(A) Replace buses that have exceeded
10their useful life

 

11Project Allocation

850,000

12(Base Project Allocation - $850,000)

 

13(3) Butler Transit Authority

 

14(A) Provide funding for purchase of new
15or used buses

 

16Project Allocation

779,000

17(Base Project Allocation - $779,000)

 

18(4) Cambria County Transit Authority

 

19(A) Rehabilitate facilities and other
20miscellaneous improvements

 

21Project Allocation

581,000

22(Base Project Allocation - $523,000)

 

23(Design & Contingencies - $58,000)

 

24(5) Centre Area Transportation Authority

 

25(A) Replace buses that have exceeded
26their useful life

 

27Project Allocation

1,379,000

28(Base Project Allocation - $1,379,000)

 

29(6) County of Lackawanna Transit System

 

30(A) Replace buses that have exceeded

 

1their useful life

 

2Project Allocation

726,000

3(Base Project Allocation - $726,000)

 

4(7) Hazleton Public Transit

 

5(A) Replace buses that have exceeded
6their useful life

 

7Project Allocation

87,000

8(Base Project Allocation - $87,000)

 

9(8) Leigh and Northampton Transportation
10Authority

 

11(A) Acquisition and other related costs
12for the purchase of transit buses

 

13Project Allocation

698,000

14(Base Project Allocation - $698,000)

 

15(B) Acquisition and other related costs
16for the purchase of minibuses

 

17Project Allocation

281,000

18(Base Project Allocation - $281,000)

 

19(9) Mid Mon Valley

 

20(A) Replace buses that have exceeded
21their useful life

 

22Project Allocation

395,000

23(Base Project Allocation - $395,000)

 

24(10) Monroe County Transit Authority

 

25(A) Design and construct park and ride
26lot for MCTA customers

 

27Project Allocation

387,000

28(Base Project Allocation - $348,000)

 

29(Design & Contingencies - $39,000)

 

30(B) Construct new maintenance facility

 

1building

 

2Project Allocation

581,000

3(Base Project Allocation - $523,000)

 

4(Design & Contingencies - $58,000)

 

5(11) Port Authority of Allegheny County

 

6(A) Expand bus system, including
7construction, technology updates and
8vehicle acquisition for Bus Rapid
9Transit Program

 

10Project Allocation

49,582,000

11(Base Project Allocation -
12$44,624,000)

 

13(Design & Contingencies - $4,958,000)

 

14(B) Replace major components of bus and
15fixed guideway system as part of
16Section 5307 Program

 

17Project Allocation

4,723,000

18(Base Project Allocation - $4,251,000)

 

19(Design & Contingencies - $472,000)

 

20(C) Replace buses and rehabilitate
21various facilities and infrastructure
22as part of Bus and Bus Facilities
23Program

 

24Project Allocation

697,000

25(Base Project Allocation - $627,000)

 

26(Design & Contingencies - $70,000)

 

27(D) Rehabilitate or replace existing
28facilities and infrastructure as part
29of Federal grant program

 

30Project Allocation

6,484,000

1(Base Project Allocation - $5,836,000)

 

2(Design & Contingencies - $648,000)

 

3(E) Purchase 70 replacement buses as part
4of Section 5307 Flex Funds Program

 

5Project Allocation

1,836,000

6(Base Project Allocation - $1,652,000)

 

7(Design & Contingencies - $184,000)

 

8(F) Provide for capital improvements to
9stations, signals, track and buildings
10as part of Infrastructure Safety
11Renewal Program

 

12Project Allocation

14,516,000

13(Base Project Allocation -
14$13,064,000)

 

15(Design & Contingencies - $1,452,000)

 

16(G) Provide for overhaul of rolling stock
17as part of Vehicle Overhaul Program

 

18Project Allocation

3,387,000

19(Base Project Allocation - $3,048,000)

 

20(Design & Contingencies - $339,000)

 

21(12) River Valley Transit

 

22(A) Expand River Transit Center to
23accommodate needs

 

24Project Allocation

968,000

25(Base Project Allocation - $871,000)

 

26(Design & Contingencies - $97,000)

 

27(B) Construct CNG fueling station and
28renovate the maintenance facility to
29accommodate CNG vehicles

 

30Project Allocation

731,000

1(Base Project Allocation - $658,000)

 

2(Design & Contingencies - $73,000)

 

3(C) Replace rolling stock that has met
4its useful life

 

5Project Allocation

484,000

6(Base Project Allocation - $484,000)

 

7(13) Schuylkill Transportation System

 

8(A) Expand existing facility to
9accommodate current and future needs

 

10Project Allocation

581,000

11(Base Project Allocation - $523,000)

 

12(Design & Contingencies - $58,000)

 

13(14) Southeastern Pennsylvania Transportation
14Authority

 

15(A) Replace buses and rehabilitate
16various facilities as part of
17Urbanized Area Formula Program

 

18Project Allocation

47,613,000

19(Base Project Allocation -
20$42,852,000)

 

21(Design & Contingencies - $4,761,000)

 

22(B) Rehabilitate or replace various
23facilities and infrastructure as part
24of State of Good Repair Program

 

25Project Allocation

51,097,000

26(Base Project Allocation -
27$45,987,000)

 

28(Design & Contingencies - $5,110,000)

 

29(C) Replace buses and rehabilitate
30various facilities and infrastructure

 

1as part of Bus and Bus Facilities
2Program

 

3Project Allocation

3,484,000

4(Base Project Allocation - $3,136,000)

 

5(Design & Contingencies - $348,000)

 

6(D) Repair or rehabilitate various
7facilities and infrastructure as part
8of Bus Purchase Flex Program

 

9Project Allocation

8,266,000

10(Base Project Allocation - $7,439,000)

 

11(Design & Contingencies - $827,000)

 

12(E) Rehabilitate or replace existing
13facilities and infrastructure as part
14of Federal grant program

 

15Project Allocation

5,807,000

16(Base Project Allocation - $5,226,000)

 

17(Design & Contingencies - $581,000)

 

18(F) Restore transit and railroad
19infrastructure, including maintenance
20support facilities, as part of
21Infrastructure Safety Renewal Program

 

22Project Allocation

69,678,000

23(Base Project Allocation -
24$62,710,000)

 

25(Design & Contingencies - $6,968,000)

 

26(G) Rehabilitate or replace various
27facilities and infrastructure as part
28of State of Good Repair Program

 

29Project Allocation

19,356,000

30(Base Project Allocation -

 

1$17,420,000)

 

2(Design & Contingencies - $1,936,000)

 

3(H) Replace existing assets as part of
4Vehicle Overhaul Program

 

5Project Allocation

55,162,000

6(Base Project Allocation -
7$49,646,000)

 

8(Design & Contingencies - $5,516,000)

 

9(15) Westmoreland County Transportation
10Authority

 

11(A) Purchase property and construct park
12and ride lot for MCTA customers

 

13Project Allocation

581,000

14(Land Allocation - $145,000)

 

15(Design & Contingencies - $436,000)

 

16(16) York Adams Transportation Authority

 

17(A) Replacement of rolling stock

 

18Project Allocation

892,000

19(Base Project Allocation - $892,000)

 

20(b) Rural and intercity rail.--Additional capital projects
21in the category of transportation assistance projects for rural
22and intercity rail service projects to be constructed or with
23respect to which an interest is to be acquired by the Department
24of Transportation, its successors or assigns and to be financed
25by the incurring of debt are hereby itemized, together with
26their respective estimated financial costs, as follows:

27 

28Project

Total Project

Allocation

29(1) Dauphin County

 

30(i) Swatara Township

 

1(A) Acquisition, construction,
2redevelopment, renovation and related
3costs for Norfolk Southern Railroad
4upgrades and improvements to
5infrastructure within proximity to
6Rutherford Rail Yard

 

7Project Allocation

50,000,000

8(Base Project Allocation -
9$50,000,000)

 

10(2) Lawrence County

 

11(i) Bessemer and Mahoning Boroughs

 

12(A) Construction, acquisition,
13infrastructure, redevelopment,
14abatement of hazardous materials,
15renovation, rehabilitation and other
16related costs for the installation of
17rail lines

 

18Project Allocation

10,000,000

19(Base Project Allocation -
20$10,000,000)

 

21(ii) Ellwood City Borough

 

22(A) Construction, infrastructure,
23renovation, rehabilitation and other
24related costs for a railroad underpass

 

25Project Allocation

500,000

26(Base Project Allocation - $500,000)

 

27(iii) City of New Castle

 

28(A) Construction, acquisition,
29infrastructure, redevelopment,
30abatement of hazardous materials,

 

1renovation, rehabilitation and other
2related costs for the installation of
3rail lines

 

4Project Allocation

5,000,000

5(Base Project Allocation - $5,000,000)

 

6(iv) Neshannock Township

 

7(A) Construction, acquisition,
8infrastructure and other related costs
9for the installation of rail lines at
10Millennium Technology Park

 

11Project Allocation

15,000,000

12(Base Project Allocation -
13$15,000,000)

 

14(v) New Beaver Borough

 

15(A) Construction, acquisition,
16infrastructure, redevelopment,
17abatement of hazardous materials,
18renovation, rehabilitation and other
19related costs for the installation of
20rail lines at New Beaver Commercial
21Park

 

22Project Allocation

3,000,000

23(Base Project Allocation - $3,000,000)

 

24(3) Mercer County

 

25(i) City of Farrell

 

26(A) Construction, infrastructure,
27renovation, rehabilitation and other
28related costs for a car thawing system
29and related facilities

 

30Project Allocation

3,500,000

1(Base Project Allocation - $3,500,000)

 

2(ii) City of Sharon

 

3(A) Construction, infrastructure,
4renovation, rehabilitation and other
5related costs for rail facility

 

6Project Allocation

1,050,000

7(Base Project Allocation - $1,050,000)

 

8(iii) Sharpsville Borough

 

9(A) Construction, infrastructure and
10other related costs for transload
11railroad siding facility

 

12Project Allocation

7,000,000

13(Base Project Allocation - $7,000,000)

 

14(4) Monroe County

 

15(i) East Stroudsburg Borough

 

16(A) Construction and related costs for
17replacement of a railroad bridge

 

18Project Allocation

1,200,000

19(Base Project Allocation - $1,200,000)

 

20(c) Air transportation.--Additional capital projects in the
21category of transportation assistance projects for air
22transportation service to which an interest is to be acquired by
23the Department of Transportation, its successors or assigns and
24to be financed by the incurring of debt are hereby itemized,
25together with their respective estimated financial costs, as
26follows:

27 

28Project

Total Project

Allocation

29(1) Adams County

 

30(i) Cumberland Township

 

1(A) Rehabilitation of existing aviation
2facilities and construction of new
3hangars, taxiways and airport related
4buildings at Gettysburg Regional
5Airport

 

6Project Allocation

700,000

7(Base Project Allocation - $700,000)

 

8(2) Dauphin County

 

9(i) Susquehanna Area Regional Airport
10Authority

 

11(A) Rehabilitation of existing aviation
12facilities and construction,
13infrastructure and related costs of
14new hangars, taxiways and airport
15related buildings at Harrisburg
16International Airport

 

17Project Allocation

1,000,000

18(Base Project Allocation - $1,000,000)

 

19(3) York County

 

20(i) Susquehanna Area Regional Airport
21Authority

 

22(A) Rehabilitation of existing aviation
23facilities and construction of new
24hangars, taxiways and airport related
25buildings at Capital City Airport

 

26Project Allocation

700,000

27(Base Project Allocation - $700,000)

 

28Section 6. Itemization of redevelopment assistance projects.

29(a) Additional capital projects in the category of
30redevelopment assistance projects for capital grants by the

1Department of Community and Economic Development, its successors
2or assigns, authorized under the provisions of the act of May
320, 1949 (P.L.1633, No.493), known as the Housing and
4Redevelopment Assistance Law, and redevelopment assistance
5capital projects and to be financed by the incurring of debt,
6are hereby itemized, together with their estimated financial
7costs, as follows:

8 

9Project

Total Project

Allocation

10(1) Adams County

 

11(i) County projects (Reserved)

 

12(ii) Cumberland Township

 

13(A) Construction, infrastructure,
14acquisition and related costs for an
15economic development project at
16Gettysburg Regional Airport

 

17Project Allocation

5,000,000

18(Base Project Allocation - $5,000,000)

 

19(2) Allegheny County

 

20(i) County projects (Reserved)

 

21(ii) City of Pittsburgh

 

22(A) Construction, infrastructure,
23renovation and other related costs for
24the Allegheny County Courthouse

 

25Project Allocation

20,000,000

26(Base Project Allocation -
27$20,000,000)

 

28(B) Construction, infrastructure,
29renovation, rehabilitation and other
30related costs for the City-County

 

1Building

 

2Project Allocation

2,600,000

3(Base Project Allocation - $2,600,000)

 

4(C) Construction, acquisition,
5infrastructure and other related costs
6for a renovation project at Duquesne
7University

 

8Project Allocation

20,000,000

9(Base Project Allocation -
10$20,000,000)

 

11(D) Construction, acquisition,
12infrastructure and other related costs
13for an educational complex

 

14Project Allocation

5,500,000

15(Base Project Allocation - $5,500,000)

 

16(E) Construction, infrastructure,
17renovation, rehabilitation and other
18related costs for the John P. Robin
19Civic Building

 

20Project Allocation

1,000,000

21(Base Project Allocation - $1,000,000)

 

22(F) Construction, infrastructure,
23renovation, rehabilitation and other
24related costs for the Municipal Courts
25Building

 

26Project Allocation

1,000,000

27(Base Project Allocation - $1,000,000)

 

28(G) Construction, infrastructure,
29redevelopment and other related costs
30for a parking facility on the North

 

1Side of Pittsburgh

 

2Project Allocation

7,000,000

3(Base Project Allocation - $7,000,000)

 

4(H) Construction, acquisition,
5infrastructure, renovation,
6rehabilitation and other related costs
7for a public safety training facility

 

8Project Allocation

2,500,000

9(Base Project Allocation - $2,500,000)

 

10(I) Construction, redevelopment,
11renovation, rehabilitation and other
12related costs for the Union Trust
13Building project

 

14Project Allocation

10,000,000

15(Base Project Allocation -
16$10,000,000)

 

17(iii) Monroeville Borough

 

18(A) Acquisition, infrastructure,
19renovation and other related costs for
20Pittsburgh Supercomputing Center

 

21Project Allocation

550,000

22(Base Project Allocation - $550,000)

 

23(iv) O'Hara Township

 

24(A) Construction, infrastructure and
25related costs for a community center
26building

 

27Project Allocation

1,000,000

28(Base Project Allocation - $1,000,000)

 

29(3) Armstrong County (Reserved)

 

30(4) Beaver County

 

1(i) County projects

 

2(A) Acquisition, construction,
3renovation, infrastructure,
4redevelopment, abatement of hazardous
5materials and other related costs for
6Ambridge Harmony Redevelopment Project

 

7Project Allocation

6,000,000

8(Base Project Allocation - $6,000,000)

 

9(B) Acquisition, construction,
10renovation, infrastructure,
11redevelopment, abatement of hazardous
12materials and other related costs for
13industrial site improvements and
14cleanup in Koppel Borough and Big
15Beaver Borough

 

16Project Allocation

5,000,000

17(Base Project Allocation - $5,000,000)

 

18(C) Acquisition, construction,
19renovation, infrastructure,
20redevelopment, abatement of hazardous
21materials and other related costs for
22blight removal

 

23Project Allocation

7,500,000

24(Base Project Allocation - $7,500,000)

 

25(ii) City of Beaver Falls

 

26(A) Construction, acquisition,
27infrastructure, abatement of hazardous
28materials, renovation, rehabilitation
29and other related costs of a community
30center and public plaza

 

1Project Allocation

5,000,000

2(Base Project Allocation - $5,000,000)

 

3(B) Construction, acquisition,
4infrastructure, redevelopment,
5abatement of hazardous materials,
6renovation, rehabilitation and other
7related costs for a mixed use building
8project

 

9Project Allocation

2,500,000

10(Base Project Allocation - $2,500,000)

 

11(C) Construction, acquisition,
12infrastructure, redevelopment,
13renovation, rehabilitation, site
14development and other related costs of
15the revitalization of the business
16district of Beaver Falls

 

17Project Allocation

5,000,000

18(Base Project Allocation - $5,000,000)

 

19(D) Construction, acquisition,
20infrastructure, redevelopment,
21renovation, rehabilitation, site
22development and other related costs of
23the master plan for the Beaver Falls
24park systems

 

25Project Allocation

500,000

26(Base Project Allocation - $500,000)

 

27(E) Construction, acquisition,
28infrastructure, redevelopment,
29renovation, rehabilitation, site
30development and other related costs of

 

1the Beaver Falls Riverfront
2Development

 

3Project Allocation

5,000,000

4(Base Project Allocation - $5,000,000)

 

5(iii) Baden Borough

 

6(A) Acquisition, construction,
7renovation, infrastructure,
8redevelopment, abatement of hazardous
9materials and other related costs for
10Baden Development Project

 

11Project Allocation

5,000,000

12(Base Project Allocation - $5,000,000)

 

13(iv) Center Township

 

14(A) Acquisition, construction,
15renovation, infrastructure,
16redevelopment and other related costs
17for Center Township development areas

 

18Project Allocation

10,000,000

19(Base Project Allocation -
20$10,000,000)

 

21(v) Hopewell Township

 

22(A) Acquisition, construction,
23renovation, infrastructure,
24redevelopment and other related costs
25for Hopewell Development Area

 

26Project Allocation

10,000,000

27(Base Project Allocation -
28$10,000,000)

 

29(vi) Midland Borough

 

30(A) Acquisition, construction,

 

1renovation, infrastructure,
2redevelopment, abatement of hazardous
3materials and other related costs for
4industrial site improvements and
5cleanup

 

6Project Allocation

5,000,000

7(Base Project Allocation - $5,000,000)

 

8(vii) Monaca Borough

 

9(A) Acquisition, construction,
10renovation, infrastructure,
11redevelopment, abatement of hazardous
12materials and other related costs for
13industrial site improvements and
14cleanup

 

15Project Allocation

10,000,000

16(Base Project Allocation -
17$10,000,000)

 

18(viii) New Sewickley Township

 

19(A) Acquisition, construction,
20renovation, infrastructure,
21redevelopment, abatement of hazardous
22materials and other related costs for
23New Sewickley Development Project

 

24Project Allocation

5,000,000

25(Base Project Allocation - $5,000,000)

 

26(B) Construction, acquisition,
27infrastructure and other related costs
28for a hotel project

 

29Project Allocation

5,000,000

30(Base Project Allocation - $5,000,000)

 

1(ix) Potter Township

 

2(A) Acquisition, construction,
3renovation, infrastructure,
4redevelopment, abatement of hazardous
5materials and other related costs for
6industrial site improvements and
7cleanup

 

8Project Allocation

5,000,000

9(Base Project Allocation - $5,000,000)

 

10(x) Rochester Borough

 

11(A) Acquisition, construction,
12renovation, infrastructure, abatement
13of hazardous materials and other
14related costs for Rochester Area
15riverfront

 

16Project Allocation

3,000,000

17(Base Project Allocation - $3,000,000)

 

18(5) Bedford County (Reserved)

 

19(6) Berks County

 

20(i) County projects (Reserved)

 

21(ii) Wyomissing Borough

 

22(A) Acquisition, construction,
23demolition, infrastructure
24improvements and revitalization of a
25development site

 

26Project Allocation

12,000,000

27(Base Project Allocation -
28$12,000,000)

 

29(7) Blair County (Reserved)

 

30(8) Bradford County

 

1(i) County projects (Reserved)

 

2(ii) Towanda Borough

 

3(A) Construction, infrastructure and
4related costs of a cogeneration
5project for Global Tungsten and
6Powders Corporation

 

7Project Allocation

5,000,000

8(Base Project Allocation - $5,000,000)

 

9(9) Bucks County

 

10(i) County projects

 

11(A) Construction, infrastructure and
12related costs for a First Tee indoor
13instructional facility

 

14Project Allocation

500,000

15(Base Project Allocation - $500,000)

 

16(ii) Bensalem Township

 

17(A) Construction, infrastructure,
18renovation and related costs for the
19conversion of a building into a
20community sports and recreation
21facility and a community theater

 

22Project Allocation

2,000,000

23(Base Project Allocation - $2,000,000)

 

24(iii) New Hope Borough

 

25(A) Construction, infrastructure and
26related costs for the redevelopment of
27the former Odette's site

 

28Project Allocation

10,000,000

29(Base Project Allocation -
30$10,000,000)

 

1(iv) Northampton township

 

2(A) Construction, infrastructure and
3related costs for a police station

 

4Project Allocation

2,500,000

5(Base Project Allocation - $2,500,000)

 

6(10) Butler County (Reserved)

 

7(11) Cambria County (Reserved)

 

8(12) Cameron County (Reserved)

 

9(13) Carbon County (Reserved)

 

10(14) Centre County (Reserved)

 

11(15) Chester County

 

12(i) County projects (Reserved)

 

13(ii) City of Coatesville

 

14(A) Construction, infrastructure and
15related costs for the renovation of
16the Graystone Mansion

 

17Project Allocation

500,000

18(Base Project Allocation - $500,000)

 

19(16) Clarion County (Reserved)

 

20(17) Clearfield County (Reserved)

 

21(18) Clinton County (Reserved)

 

22(19) Columbia County (Reserved)

 

23(20) Crawford County (Reserved)

 

24(21) Cumberland County

 

25(i) County projects

 

26(A) Land acquisition, infrastructure
27improvements, demolition, site
28improvement, renovation, addition,
29utility expansion, construction,
30purchase of medically necessary

 

1fixtures and other related costs for
2facilities of the Holy Spirit Health
3System

 

4Project Allocation

10,000,000

5(Base Project Allocation -
6$10,000,000)

 

7(ii) East Pennsboro Township

 

8(A) Construction, infrastructure,
9redevelopment and related costs for
10the Summerdale mixed-use development
11project, Cumberland County Industrial
12Development Authority

 

13Project Allocation

15,000,000

14(Base Project Allocation -
15$15,000,000)

 

16(22) Dauphin County

 

17(i) County projects

 

18(A) Land acquisition, infrastructure
19improvements, demolition, site
20improvement, renovation, addition,
21utility expansion, construction,
22purchase of medically necessary
23fixtures and other related costs for
24facilities of the Holy Spirit Health
25System

 

26Project Allocation

10,000,000

27(Base Project Allocation -
28$10,000,000)

 

29(ii) City of Harrisburg

 

30(A) Construction, infrastructure,

 

1redevelopment, renovation,
2rehabilitation and other related costs
3for a soccer and multipurpose sports
4and recreation complex at City Island

 

5Project Allocation

7,000,000

6(Base Project Allocation - $7,000,000)

 

7(B) Construction, acquisition,
8infrastructure, redevelopment,
9renovation, rehabilitation and other
10related costs of a senior residential
11and care center

 

12Project Allocation

10,000,000

13(Base Project Allocation -
14$10,000,000)

 

15(C) Construction, acquisition,
16infrastructure, redevelopment,
17renovation, rehabilitation and other
18related costs for blight elimination
19in the City of Harrisburg downtown
20business district

 

21Project Allocation

5,000,000

22(Base Project Allocation - $5,000,000)

 

23(D) Construction, infrastructure,
24redevelopment, renovation,
25rehabilitation and other related costs
26for the Strawberry Square Complex

 

27Project Allocation

1,000,000

28(Base Project Allocation - $1,000,000)

 

29(iii) Hummelstown Borough

 

30(A) Construction, infrastructure,

 

1redevelopment, renovation and related
2costs for pedestrian safety and
3streetscape improvements

 

4Project Allocation

5,000,000

5(Base Project Allocation - $5,000,000)

 

6(iv) Middletown Borough

 

7(A) Construction, infrastructure,
8redevelopment, renovation and related
9costs for pedestrian safety
10improvements and restoration,
11revitalization of historical buildings
12in Middletown Borough Industrial and
13Commercial Development Authority

 

14Project Allocation

15,000,000

15(Base Project Allocation -
16$15,000,000)

 

17(v) Derry Township Industrial and Commercial
18Development Authority

 

19(A) Acquisition, construction,
20infrastructure, redevelopment,
21renovation and related costs for an
22urban downtown revitalization project

 

23Project Allocation

30,000,000

24(Base Project Allocation -
25$30,000,000)

 

26(B) Construction, infrastructure,
27redevelopment, renovation and related
28costs to bring a historical facility
29up to current building codes and ADA
30requirements

 

1Project Allocation

10,000,000

2(Base Project Allocation -
3$10,000,000)

 

4(C) Construction, infrastructure,
5redevelopment, renovation and related
6costs for upgrades to existing
7township recreational site, including
8ADA upgrades to existing buildings and
9facilities and improvements to
10existing sports fields

 

11Project Allocation

5,000,000

12(Base Project Allocation - $5,000,000)

 

13(D) Acquisition, construction,
14infrastructure and related costs for a
15regional economic development project

 

16Project Allocation

50,000,000

17(Base Project Allocation -
18$50,000,000)

 

19(E) Construction, infrastructure,
20redevelopment, renovation and related
21costs for pedestrian safety, public
22improvements, campus security upgrades
23and flood control improvements at Penn
24State Hershey Medical Center

 

25Project Allocation

25,000,000

26(Base Project Allocation -
27$25,000,000)

 

28(vi) Lower Swatara Township

 

29(A) Acquisition, construction,
30infrastructure and related costs for

 

1an economic development project at
2Harrisburg International Airport

 

3Project Allocation

5,000,000

4(Base Project Allocation - $5,000,000)

 

5(B) Construction, acquisition,
6redevelopment, renovation and related
7costs for student pedestrian safety,
8infrastructure improvements, campus
9security upgrades and flood control
10improvements at Pennsylvania State
11University Harrisburg Campus

 

12Project Allocation

20,000,000

13(Base Project Allocation -
14$20,000,000)

 

15(vii) Swatara Township

 

16(A) Acquisition, construction,
17redevelopment, renovation and related
18costs for Norfolk Southern Railroad
19upgrades and improvements to
20infrastructure within proximity to
21Rutherford Rail Yard

 

22Project Allocation

50,000,000

23(Base Project Allocation -
24$50,000,000)

 

25(23) Delaware County

 

26(i) County projects

 

27(A) Construction, infrastructure,
28redevelopment and related costs for
29infrastructure improvements,
30rehabilitation, renovation and other

 

1capital projects

 

2Project Allocation

20,000,000

3(Base Project Allocation -
4$20,000,000)

 

5(ii) Darby Borough

 

6(A) Construction, renovation,
7infrastructure, redevelopment and
8other related costs for Darby Free
9Library

 

10Project Allocation

500,000

11(Base Project Allocation - $500,000)

 

12(24) Elk County (Reserved)

 

13(25) Erie County

 

14(i) County projects (Reserved)

 

15(ii) Harborcreek Township

 

16(A) Construction, renovation and related
17costs for the renovation and expansion
18of the municipal building

 

19Project Allocation

1,500,000

20(Base Project Allocation - $1,500,000)

 

21(26) Fayette County (Reserved)

 

22(27) Forest County (Reserved)

 

23(28) Franklin County

 

24(i) County projects (Reserved)

 

25(ii) Greene Township

 

26(A) Rehabilitation of existing aviation
27facilities and construction of new
28hangars, taxiways and airport related
29buildings at Franklin County Regional
30Airport

 

1Project Allocation

700,000

2(Base Project Allocation - $700,000)

 

3(B) Construction, infrastructure,
4acquisition and related costs for an
5economic development project at
6Franklin County Regional Airport

 

7Project Allocation

5,000,000

8(Base Project Allocation - $5,000,000)

 

9(29) Fulton County (Reserved)

 

10(30) Greene County (Reserved)

 

11(31) Huntingdon County (Reserved)

 

12(32) Indiana County (Reserved)

 

13(33) Jefferson County (Reserved)

 

14(34) Juniata County (Reserved)

 

15(35) Lackawanna County (Reserved)

 

16(36) Lancaster County

 

17(i) County projects (Reserved)

 

18(ii) Columbia Borough

 

19(A) Construction, infrastructure,
20redevelopment, renovation and related
21costs for the Columbia Market House

 

22Project Allocation

500,000

23(Base Project Allocation - $500,000)

 

24(iii) East Lampeter Township

 

25(A) Construction, infrastructure,
26renovation and related costs for the
27development of a recreational area

 

28Project Allocation

1,000,000

29(Base Project Allocation - $1,000,000)

 

30(B) Construction, infrastructure,

 

1acquisition, renovation and related
2costs for the redevelopment of the
3Lancaster Host property

 

4Project Allocation

2,500,000

5(Base Project Allocation - $2,500,000)

 

6(iv) Manheim Borough

 

7(A) Construction, infrastructure and
8related costs for a police department
9building

 

10Project Allocation

1,500,000

11(Base Project Allocation - $1,500,000)

 

12(v) West Lampeter Township

 

13(A) Construction, redevelopment,
14renovation and related costs for
15upgrades and improvements to Village
16Park

 

17Project Allocation

1,500,000

18(Base Project Allocation - $1,500,000)

 

19(37) Lawrence County

 

20(i) County projects

 

21(A) Construction, acquisition,
22infrastructure, redevelopment,
23abatement of hazardous materials,
24renovation, rehabilitation and other
25related costs for the development of a
26former cement plant in Bessemer and
27Mahoning Boroughs

 

28Project Allocation

10,000,000

29(Base Project Allocation -
30$10,000,000)

 

1(B) Construction, acquisition,
2infrastructure, redevelopment,
3abatement of hazardous materials,
4renovation, rehabilitation and other
5related costs to assist in the
6development of the equine industry

 

7Project Allocation

5,000,000

8(Base Project Allocation - $5,000,000)

 

9(C) Construction, acquisition,
10infrastructure, redevelopment,
11abatement of hazardous materials,
12renovation, rehabilitation and other
13related costs to assist with the
14removal of blight

 

15Project Allocation

7,250,000

16(Base Project Allocation - $7,250,000)

 

17(D) Construction, acquisition,
18infrastructure, redevelopment,
19abatement of hazardous materials,
20renovation, rehabilitation and other
21related costs for the redevelopment of
22the I-376 industrial/commercial
23corridor

 

24Project Allocation

12,500,000

25(Base Project Allocation -
26$12,500,000)

 

27(E) Construction, acquisition,
28infrastructure, redevelopment,
29abatement of hazardous materials,
30renovation, rehabilitation and other

 

1related costs for the development of
2the Route 18 industrial/commercial
3corridor

 

4Project Allocation

12,500,000

5(Base Project Allocation -
6$12,500,000)

 

7(F) Construction, acquisition,
8infrastructure, redevelopment,
9abatement of hazardous materials,
10renovation, rehabilitation and other
11related costs for the development of
12Route 65 industrial/commercial
13corridor

 

14Project Allocation

5,000,000

15(Base Project Allocation - $5,000,000)

 

16(G) Construction, acquisition,
17infrastructure, redevelopment,
18abatement of hazardous materials,
19renovation, rehabilitation and other
20related costs for the development of
21Route 422 industrial/commercial
22corridor

 

23Project Allocation

12,500,000

24(Base Project Allocation -
25$12,500,000)

 

26(ii) City of New Castle

 

27(A) Construction, infrastructure,
28redevelopment, abatement of hazardous
29materials for a compressed natural gas
30filling station for the needs of

 

1public and nonpublic vehicle fleets

 

2Project Allocation

1,000,000

3(Base Project Allocation - $1,000,000)

 

4(B) Construction, infrastructure,
5redevelopment, renovation,
6rehabilitation and other related costs
7for the YMCA

 

8Project Allocation

1,000,000

9(Base Project Allocation - $1,000,000)

 

10(C) Construction, acquisition,
11infrastructure, redevelopment,
12abatement of hazardous materials,
13renovation, rehabilitation and other
14related costs for the redevelopment of
15commercial sites

 

16Project Allocation

10,000,000

17(Base Project Allocation -
18$10,000,000)

 

19(D) Construction, acquisition,
20infrastructure, redevelopment,
21abatement of hazardous materials,
22renovation, rehabilitation and other
23related costs for a heavy industrial
24facility

 

25Project Allocation

5,000,000

26(Base Project Allocation - $5,000,000)

 

27(iii) Hickory Township

 

28(A) Construction, acquisition,
29infrastructure and other related costs
30to construct a 911 Emergency and

 

1Training Center

 

2Project Allocation

10,000,000

3(Base Project Allocation -
4$10,000,000)

 

5(iv) Neshannock Township

 

6(A) Construction, acquisition,
7infrastructure and other related costs
8for the development of the Millennium
9Technology Park

 

10Project Allocation

15,000,000

11(Base Project Allocation -
12$15,000,000)

 

13(v) New Beaver Borough

 

14(A) Construction, acquisition,
15infrastructure, redevelopment,
16abatement of hazardous materials,
17renovation, rehabilitation and other
18related costs for the redevelopment of
19a business park

 

20Project Allocation

3,000,000

21(Base Project Allocation - $3,000,000)

 

22(38) Lebanon County

 

23(i) County projects

 

24(A) Acquisition, construction,
25infrastructure and related costs for
26new or renovated health care related
27capital facilities or equipment at
28various locations within the county
29for Good Samaritan Hospital and any
30successor

 

1Project Allocation

5,000,000

2(Base Project Allocation - $5,000,000)

 

3(ii) Palmyra Borough

 

4(A) Construction, infrastructure and
5related costs of a new fire station
6for the Palmyra Fire Department

 

7Project Allocation

2,000,000

8(Base Project Allocation - $2,000,000)

 

9(39) Lehigh County

 

10(i) County projects (Reserved)

 

11(ii) City of Allentown

 

12(A) Construction, renovation,
13infrastructure, redevelopment,
14abatement of hazardous materials and
15other related costs for Pool Science
16Center

 

17Project Allocation

1,000,000

18(Base Project Allocation - $1,000,000)

 

19(B) Construction, infrastructure,
20renovation and other related costs for
21expansion of Early Head Start-
22SafeStart program

 

23Project Allocation

500,000

24(Base Project Allocation - $500,000)

 

25(C) Construction, infrastructure,
26redevelopment, renovation and other
27related costs for the Phoebe Allentown
28Health Care Center

 

29Project Allocation

2,500,000

30(Base Project Allocation - $2,500,000)

 

1(D) Construction, renovation,
2rehabilitation and other related costs
3for a YMCA and YWCA facility

 

4Project Allocation

752,000

5(Base Project Allocation - $752,000)

 

6(E) Construction, renovation,
7infrastructure, redevelopment,
8abatement of hazardous materials and
9other related costs for Cedar Crest
10College redevelopment projects

 

11Project Allocation

2,000,000

12(Base Project Allocation - $2,000,000)

 

13(F) Construction, infrastructure,
14redevelopment, abatement of hazardous
15materials and other related costs at a
16former incinerator site

 

17Project Allocation

3,000,000

18(Base Project Allocation - $3,000,000)

 

19(G) Construction, infrastructure,
20redevelopment, abatement of hazardous
21materials, renovation, rehabilitation
22and other related costs for a former
23manufacturing site

 

24Project Allocation

5,000,000

25(Base Project Allocation - $5,000,000)

 

26(H) Acquisition, construction,
27infrastructure, redevelopment and
28other related costs of a multiuse
29residential, commercial and parking
30facility

 

1Project Allocation

5,000,000

2(Base Project Allocation - $5,000,000)

 

3(I) Construction, renovation
4rehabilitation and other related costs
5of a mixed use development located in
6or near a former silk mill building

 

7Project Allocation

4,000,000

8(Base Project Allocation - $4,000,000)

 

9(40) Luzerne County (Reserved)

 

10(41) Lycoming County

 

11(i) County projects

 

12(A) Infrastructure, construction and
13related costs for development of the
14Timber Run Industrial Park in Brady
15and Gregg Townships

 

16Project Allocation

1,200,000

17(Base Project Allocation - $1,200,000)

 

18(ii) City of Williamsport

 

19(A) Acquisition, remediation,
20construction, infrastructure and
21related costs for redevelopment of
22brownfield sites

 

23Project Allocation

5,000,000

24(Base Project Allocation - $5,000,000)

 

25(B) Construction, infrastructure,
26acquisition, renovation and related
27costs for an economic development
28initiative within the Old City area
29and the Gateway Commission area

 

30Project Allocation

2,300,000

1(Base Project Allocation - $2,300,000)

 

2(iii) Muncy Township

 

3(A) Renovation and expansion of Eastern
4Lycoming YMCA Community Center

 

5Project Allocation

1,000,000

6(Base Project Allocation - $1,000,000)

 

7(42) McKean County

 

8(i) County projects (Reserved)

 

9(ii) City of Bradford

 

10(A) Redevelopment, acquisition,
11infrastructure and related costs for
12recreational improvements, renovation
13of existing facilities and the
14construction of new facilities in city
15owned parks and the Kessel Athletic
16Complex and the continued development
17of the Tuna Valley Trail Association
18Trail System

 

19Project Allocation

5,000,000

20(Base Project Allocation - $5,000,000)

 

21(B) Acquisition of property, demolition,
22renovation, new construction and
23related costs including infrastructure
24improvements for the development of
25housing to stabilize aging and
26declining housing stock

 

27Project Allocation

5,000,000

28(Base Project Allocation - $5,000,000)

 

29(43) Mercer County

 

30(i) County projects

 

1(A) Acquisition, infrastructure,
2redevelopment, abatement of hazardous
3materials and other related costs to
4redevelop blighted areas in Mercer
5County

 

6Project Allocation

2,500,000

7(Base Project Allocation - $2,500,000)

 

8(B) Construction, infrastructure and
9other related costs for an economic
10development project in Mercer County

 

11Project Allocation

2,000,000

12(Base Project Allocation - $2,000,000)

 

13(ii) City of Farrell

 

14(A) Acquisition, infrastructure,
15redevelopment, abatement of hazardous
16materials and other related costs to
17redevelop a blighted area

 

18Project Allocation

1,500,000

19(Base Project Allocation - $1,500,000)

 

20(iii) City of Sharon

 

21(A) Construction, infrastructure,
22redevelopment and other related costs
23for redevelopment activities in
24downtown City of Sharon

 

25Project Allocation

500,000

26(Base Project Allocation - $500,000)

 

27(iv) Greene Township

 

28(A) Construction, infrastructure,
29redevelopment, renovation and related
30costs for equipment and the expansion

 

1of Combined Systems, Inc.

 

2Project Allocation

4,000,000

3(Base Project Allocation - $4,000,000)

 

4(44) Mifflin County (Reserved)

 

5(45) Monroe County

 

6(i) County projects (Reserved)

 

7(ii) Mount Pocono Borough

 

8(A) Construction, infrastructure and
9related costs for expansion of a fire
10company building

 

11Project Allocation

750,000

12(Base Project Allocation - $750,000)

 

13(46) Montgomery County

 

14(i) County projects (Reserved)

 

15(ii) Cheltanham Township

 

16(A) Renovation, rehabilitation and other
17related costs of Salus University
18facilities in Elkins Park

 

19Project Allocation

2,500,000

20(Base Project Allocation - $2,500,000)

 

21(iii) Conshohocken Borough

 

22(A) Construction, redevelopment and other
23related costs for the construction of
24an office headquarters in Conshohocken

 

25Project Allocation

8,000,000

26(Base Project Allocation - $8,000,000)

 

27(iv) Hatfield Borough

 

28(A) Construction, infrastructure,
29redevelopment, renovation and related
30costs for a new borough office

 

1Project Allocation

1,500,000

2(Base Project Allocation - $1,500,000)

 

3(v) Lower Gwynedd Township

 

4(A) Construction, infrastructure and
5related costs for a new fire and
6ambulance substation

 

7Project Allocation

1,250,000

8(Base Project Allocation - $1,250,000)

 

9(vi) Lower Merion Township

 

10(A) Construction, infrastructure,
11renovation and other related costs for
12the Bryn Mawr Hospital

 

13Project Allocation

10,000,000

14(Base Project Allocation -
15$10,000,000)

 

16(vii) Pottstown Borough

 

17(A) Construction, rehabilitation and
18related costs for the renovation of
19the Pottstown Regional Public Library

 

20Project Allocation

500,000

21(Base Project Allocation - $500,000)

 

22(B) Construction, infrastructure,
23renovation and related costs for the
24rehabilitation and improvements to the
25Pottstown Regional Public Library

 

26Project Allocation

500,000

27(Base Project Allocation - $500,000)

 

28(viii) Whitpain Township

 

29(A) Construction infrastructure,
30redevelopment and related costs for a

 

1new firehouse

 

2Project Allocation

2,000,000

3(Base Project Allocation - $2,000,000)

 

4(B) Construction, acquisition,
5infrastructure, redevelopment,
6renovation, rehabilitation, abatement
7of hazardous materials and other costs
8related to the Ambler Area Boys and
9Girls Club

 

10Project Allocation

4,000,000

11(Base Project Allocation - $4,000,000)

 

12(47) Montour County (Reserved)

 

13(48) Northampton County

 

14(i) County projects (Reserved)

 

15(ii) Pen Argyl Borough

 

16(A) Construction and related costs for
17replacement of the Pen Argyl Public
18Municipal Pool

 

19Project Allocation

1,500,000

20(Base Project Allocation - $1,500,000)

 

21(B) Construction, infrastructure and
22related costs for a new fire company
23building

 

24Project Allocation

500,000

25(Base Project Allocation - $500,000)

 

26(C) Construction, infrastructure and
27related costs for the expansion of a
28YMCA building

 

29Project Allocation

500,000

30(Base Project Allocation - $500,000)

 

1(49) Northumberland County (Reserved)

 

2(50) Perry County

 

3(i) County projects

 

4(A) Land acquisition, infrastructure
5improvements, demolition, site
6improvement, renovation, addition,
7utility expansion, construction,
8purchase of medically necessary
9fixtures and other related costs for
10facilities of the Holy Spirit Health
11System

 

12Project Allocation

10,000,000

13(Base Project Allocation -
14$10,000,000)

 

15(51) Philadelphia County

 

16(i) County projects

 

17(A) Renovation and related costs for
18First Tee of Greater Philadelphia

 

19Project Allocation

500,000

20(Base Project Allocation - $500,000)

 

21(ii) City of Philadelphia

 

22(A) Acquisition, construction,
23infrastructure, redevelopment,
24renovation, rehabilitation, abatement
25of hazardous materials and other
26related costs to revitalize commercial
27corridors in northwest Philadelphia,
28including Vernon Road, Chew Avenue and
29other surrounding areas

 

30Project Allocation

2,500,000

1(Base Project Allocation - $2,500,000)

 

2(B) Acquisition, construction,
3infrastructure, redevelopment,
4renovation, rehabilitation, abatement
5of hazardous materials and other
6related costs to create, enhance and
7develop recreational facilities and
8athletic fields in northwest
9Philadelphia

 

10Project Allocation

2,500,000

11(Base Project Allocation - $2,500,000)

 

12(C) Acquisition, construction,
13infrastructure, redevelopment,
14renovation, rehabilitation, abatement
15of hazardous materials and other
16related costs for the Northwest
17Philadelphia Redevelopment Project to
18revitalize commercial corridors,
19recreational facilities and other
20community improvements

 

21Project Allocation

5,000,000

22(Base Project Allocation - $5,000,000)

 

23(D) Construction, renovation,
24infrastructure, redevelopment and
25abatement of hazardous materials and
26other related costs for the Reading
27Viaduct project

 

28Project Allocation

3,500,000

29(Base Project Allocation - $3,500,000)

 

30(E) Construction, infrastructure and

 

1other related costs for a YMCA branch
2expansion in West Philadelphia

 

3Project Allocation

2,000,000

4(Base Project Allocation - $2,000,000)

 

5(F) Construction, infrastructure,
6renovation, rehabilitation and other
7related costs for the Wistar Institute
8biomedical laboratory project

 

9Project Allocation

4,000,000

10(Base Project Allocation - $4,000,000)

 

11(52) Pike County (Reserved)

 

12(53) Potter County (Reserved)

 

13(54) Schuylkill County

 

14(i) County projects (Reserved)

 

15(ii) East Union Township

 

16(A) Construction, infrastructure,
17renovation, rehabilitation and other
18related costs for infrastructure
19improvements to Municipal Authority of
20the Shenandoah Borough facilities

 

21Project Allocation

1,000,000

22(Base Project Allocation - $1,000,000)

 

23(iii) West Mahanoy Township

 

24(A) Construction, renovations and related
25costs for a fire training facility

 

26Project Allocation

500,000

27(Base Project Allocation - $500,000)

 

28(55) Snyder County (Reserved)

 

29(56) Somerset County (Reserved)

 

30(57) Sullivan County (Reserved)

 

1(58) Susquehanna County

 

2(i) County projects

 

3(A) Construction, infrastructure,
4acquisition and related costs for the
5development of a new business park

 

6Project Allocation

1,500,000

7(Base Project Allocation - $1,500,000)

 

8(59) Tioga County (Reserved)

 

9(60) Union County (Reserved)

 

10(61) Venango County

 

11(i) County projects (Reserved)

 

12(ii) City of Oil City

 

13(A) Construction, rehabilitation and
14related costs for the renovation of
15Oil City Industrial Park

 

16Project Allocation

875,000

17(Base Project Allocation - $875,000)

 

18(62) Warren County (Reserved)

 

19(63) Washington County (Reserved)

 

20(64) Wayne County (Reserved)

 

21(65) Westmoreland County

 

22(i) County projects (Reserved)

 

23(ii) Ligonier Borough

 

24(A) Construction, redevelopment,
25renovation and related costs for the
26expansion of a museum and restoration
27of exhibits

 

28Project Allocation

800,000

29(Base Project Allocation - $800,000)

 

30(iii) Unity Township

 

1(A) Construction and related costs of
2academic facilities for Saint Vincent
3College

 

4Project Allocation

5,000,000

5(Base Project Allocation - $5,000,000)

 

6(66) Wyoming County (Reserved)

 

7(67) York County

 

8(i) County projects

 

9(A) Land acquisition, infrastructure
10improvements, demolition, site
11improvement, renovation, addition,
12utility expansion, construction,
13purchase of medically necessary
14fixtures and other related costs for
15facilities of the Holy Spirit Health
16System

 

17Project Allocation

10,000,000

18(Base Project Allocation -
19$10,000,000)

 

20(ii) Fairview Township

 

21(A) Construction, infrastructure,
22acquisition and related costs for an
23economic development project at
24Capital City Airport

 

25Project Allocation

5,000,000

26(Base Project Allocation - $5,000,000)

 

27(iii) Spring Garden Township

 

28(A) Construction, infrastructure and
29related costs for the redevelopment of
30the former Yorktowne Paper Mill site

 

1Project Allocation

10,000,000

2(Base Project Allocation -
3$10,000,000)

 

4(68) Multiple Counties

 

5(i) Beaver and Lawrence Counties

 

6(A) Construction, acquisition,
7infrastructure, abatement of hazardous
8materials, renovation, rehabilitation
9and other related costs of a public
10works building for the Ellwood City
11Borough

 

12Project Allocation

5,000,000

13(Base Project Allocation - $5,000,000)

 

14(B) Construction, acquisition,
15infrastructure, renovation,
16rehabilitation and other related costs
17for a public parks system in Ellwood
18City Borough

 

19Project Allocation

2,500,000

20(Base Project Allocation - $2,500,000)

 

21Section 7. Itemization of flood control projects.

22Additional capital projects in the category of flood control
23projects to be constructed by the Department of Environmental
24Protection, its successors or assigns, and to be financed by the
25incurring of debt are hereby itemized, together with their
26respective estimated costs, as follows:

27 

28Project

Total Project

Allocation

29(1) Department of Environmental Protection

 

30(i) Dauphin County

 

1(A) Construction, infrastructure,
2redevelopment, renovation and related
3costs for pedestrian safety, public
4improvements, campus security upgrades
5and flood control improvements at Penn
6State Hershey Medical Center

 

7Project Allocation

25,000,000

8(Base Project Allocation -
9$25,000,000)

 

10(B) Construction, acquisition,
11redevelopment, renovation and related
12costs for student pedestrian safety,
13infrastructure improvements, campus
14security upgrades and flood control
15improvements to Pennsylvania State
16University Harrisburg Campus

 

17Project Allocation

20,000,000

18(Base Project Allocation -
19$20,000,000)

 

20(ii) Lycoming County

 

21(A) Construction and related costs for a
22flood mitigation project

 

23Project Allocation

3,000,000

24(Base Project Allocation - $3,000,000)

 

25(iii) Montgomery County

 

26(A) Construction, infrastructure,
27renovation and related costs to
28replace failing stormwater culvert in
29Hatfield Borough

 

30Project Allocation

205,000

1(Base Project Allocation - $205,000)

 

2Section 8. Itemization of Keystone Recreation, Park and
3Conservation Fund.

4Projects in the category of public improvement projects to be
5constructed by the Department of Conservation and Natural
6Resources, its successors or assigns, and to be financed by
7current revenues of the Keystone Recreation, Park and
8Conservation Fund are hereby itemized, together with their
9respective estimated costs, as follows:

10 

11Project

Total Project

Allocation

12(1) Department of Conservation and Natural
13Resources

 

14(i) Bald Eagle State Park

 

15(A) Rehabilitate Mid State Trail Tunnel

 

16Project Allocation

1,600,000

17(Base Project Allocation - $1,600,000)

 

18(B) Repave Poe Valley Road and Millhiem-
19Siglerville Pike

 

20Project Allocation

500,000

21(Base Project Allocation - $500,000)

 

22(C) Replace main waterline within park

 

23Project Allocation

500,000

24(Base Project Allocation - $500,000)

 

25(ii) Buchanan State Park

 

26(A) Construct resource management center,
27including infrastructure

 

28Project Allocation

4,865,000

29(Base Project Allocation - $4,865,000)

 

30(B) Replace Chaneysville Maintenance

 

1Building

 

2Project Allocation

750,000

3(Base Project Allocation - $750,000)

 

4(iii) Caledonia State Park

 

5(A) Rehabilitate campgrounds, including
6infrastructure

 

7Project Allocation

2,500,000

8(Base Project Allocation - $2,500,000)

 

9(iv) Canoe Creek State Park

 

10(A) Rehabilitate sewage treatment plant

 

11Project Allocation

500,000

12(Base Project Allocation - $500,000)

 

13(v) Codorus State Park

 

14(A) Replace main boat launch, band shell
15area and comfort station, including
16infrastructure

 

17Project Allocation

450,000

18(Base Project Allocation - $450,000)

 

19(vi) Delaware Canal State Park

 

20(A) Replace Lower Limeport Bridge No.2682

 

21Project Allocation

400,000

22(Base Project Allocation - $400,000)

 

23(B) Replace Smithtown Bridge No.3517

 

24Project Allocation

400,000

25(Base Project Allocation - $400,000)

 

26(C) Provide for repairs to Cuttalossa
27culvert

 

28Project Allocation

750,000

29(Base Project Allocation - $750,000)

 

30(vii) Elk State Forest

 

1(A) Repair HVAC system for district
2office, including infrastructure and
3pipe repair

 

4Project Allocation

250,000

5(Base Project Allocation - $250,000)

 

6(viii) Forbes State Forest

 

7(A) Construct office addition to Negro
8Mountain Maintenance Complex

 

9Project Allocation

500,000

10(Base Project Allocation - $500,000)

 

11(ix) Greenwood Furnace State Park

 

12(A) Rehabilitate maintenance building

 

13Project Allocation

550,000

14(Base Project Allocation - $550,000)

 

15(x) Keystone State Park

 

16(A) Provide for connection to municipal
17sewage system

 

18Project Allocation

300,000

19(Base Project Allocation - $300,000)

 

20(xi) Lackawanna State Forest

 

21(A) Renovate park office and foyer

 

22Project Allocation

750,000

23(Base Project Allocation - $750,000)

 

24(B) Remove Olyphant Dam No.2

 

25Project Allocation

800,000

26(Base Project Allocation - $800,000)

 

27(xii) Little Buffalo State Park

 

28(A) Replace campground shower house

 

29Project Allocation

500,000

30(Base Project Allocation - $500,000)

 

1(xiii) Moraine State Park

 

2(A) Rehabilitate sewage system at
3Pleasant Valley

 

4Project Allocation

500,000

5(Base Project Allocation - $500,000)

 

6(xiv) Rothrock State Forest

 

7(A) Rehabilitate district office parking
8lots, including drainage and paving

 

9Project Allocation

250,000

10(Base Project Allocation - $250,000)

 

11(xv) Tuscarora State Forest

 

12(A) Rehabilitate Bryner Maintenance
13headquarters, including infrastructure

 

14Project Allocation

1,200,000

15(Base Project Allocation - $1,200,000)

 

16(xvi) Weiser State Forest

 

17(A) Rehabilitate Haldeman Maintenance
18Headquarters, including infrastructure

 

19Project Allocation

1,200,000

20(Base Project Allocation - $1,200,000)

 

21Section 9. Itemization of Environmental Stewardship Fund.

22The individual projects to be developed by the Department of
23Conservation and Natural Resources, its successors or assigns,
24and to be financed from current revenues of the Environmental
25Stewardship Fund are hereby itemized, together with their
26respective estimated costs, as follows:

27 

28Project

Total Project

Allocation

29(1) Department of Conservation and Natural
30Resources

 

1(i) Buchanan State Forest

 

2(A) Rehabilitate Siding Hill maintenance
3shop, including infrastructure

 

4Project Allocation

750,000

5(Base Project Allocation - $750,000)

 

6(ii) Colonel Denning State Park

 

7(A) Rehabilitate comfort station with new
8shower house and sewage infrastructure

 

9Project Allocation

1,000,000

10(Base Project Allocation - $1,000,000)

 

11(iii) Frances Slocum State Park

 

12(A) Rehabilitate sewage connection to
13DAMA and demolish current STP

 

14Project Allocation

1,050,000

15(Base Project Allocation - $1,050,000)

 

16(iv) Greenwood Furnace State Park

 

17(A) Replace water line from reservoir to
18mansion

 

19Project Allocation

400,000

20(Base Project Allocation - $400,000)

 

21(v) Laurel Hill State Park

 

22(A) Rehabilitate STP and dredge lagoons

 

23Project Allocation

540,000

24(Base Project Allocation - $540,000)

 

25(vi) Moshannon State Forest

 

26(A) Construct groomer storage building at

27Black Mountain headquarters

 

28Project Allocation

250,000

29(Base Project Allocation - $250,000)

 

30(vii) Park Region No.2

 

1(A) Scour and protect four bridges within
2park region

 

3Project Allocation

600,000

4(Base Project Allocation - $600,000)

 

5(viii) Prince Gallitzin State Park

 

6(A) Rehabilitate parking, including
7paving and drainage improvements

 

8Project Allocation

1,000,000

9(Base Project Allocation - $1,000,000)

 

10(ix) Poe Valley State Park

 

11(A) Replace park office

 

12Project Allocation

750,000

13(Base Project Allocation - $750,000)

 

14(x) Ridley Creek State Park

 

15(A) Construct new equestrian building

 

16Project Allocation

900,000

17(Base Project Allocation - $900,000)

 

18(xi) Rothrock State Forest

 

19(A) Rehabilitate pole building at Whipple
20Dam

 

21Project Allocation

250,000

22(Base Project Allocation - $250,000)

 

23(xii) Sproul State Forest

 

24(A) Construct pole building at district
25office

 

26Project Allocation

250,000

27(Base Project Allocation - $250,000)

 

28Section 10. Itemization of State forestry bridge projects.

29Projects in the category of State forestry bridge projects to
30be constructed by the Department of Conservation and Natural

1Resources, its successors or assigns, and to be financed by oil
2company franchise tax revenues under 75 Pa.C.S. § 9502(a)(2)(iv)
3(related to imposition of tax) are hereby itemized, together
4with their respective estimated costs, as follows:

5 

6Project

Total Project

Allocation

7(1) Cameron County

 

8(i) Elk State Forest

 

9(A) Replace Fee Hollow Road structure
10over West Cowley Run

 

11Project Allocation

200,000

12(Base Project Allocation - $200,000)

 

13(B) Replace Vantassel culvert

 

14Project Allocation

200,000

15(Base Project Allocation - $200,000)

 

16(2) Clearfield County

 

17(i) Moshannon State Forest

 

18(A) Replace Ames Road structure over Deer
19Creek

 

20Project Allocation

200,000

21(Base Project Allocation - $200,000)

 

22(B) Replace Medix Grade Road structure
23over tributary of Medix Run

 

24Project Allocation

200,000

25(Base Project Allocation - $200,000)

 

26(3) Clinton County

 

27(i) Sproul State Park

 

28(A) Replace Graham Road structure over
29Ferney Run

 

30Project Allocation

200,000

1(Base Project Allocation - $200,000)

 

2(4) Franklin County

 

3(i) Michaux State Forest

 

4(A) Replace box culvert along Milesburn
5Road over Kato Run

 

6Project Allocation

200,000

7(Base Project Allocation - $200,000)

 

8(5) Huntingdon County

 

9(i) Rothrock State Forest

 

10(A) Replace Laurel Run Road structure
11over tributary of Galbraith Gap Run

 

12Project Allocation

200,000

13(Base Project Allocation - $200,000)

 

14(6) Lycoming County

 

15(i) Tiadaghton State Forest

 

16(A) Replace Morris Run structure over
17Slate Run 0046

 

18Project Allocation

350,000

19(Base Project Allocation - $350,000)

 

20(7) Monroe County

 

21(i) Delaware State Forest

 

22(A) Replace Bald Hill Road structure over
23unnamed creek

 

24Project Allocation

200,000

25(Base Project Allocation - $200,000)

 

26(8) Perry County

 

27(i) Tuscarora State Forest

 

28(A) Replace Spectacle Gap Road structure
29over Spectacle Run and replace Stelzer
30Road structure over Black Log Creek

 

1Project Allocation

300,000

2(Base Project Allocation - $300,000)

 

3(9) Tioga County

 

4(i) Tioga State Forest

 

5(A) Replace Painter Leetonia Road
6structure over Four Mile Run

 

7Project Allocation

320,000

8(Base Project Allocation - $320,000)

 

9(10) Schuylkill County

 

10(i) Weiser State Forest

 

11(A) Construct south branch trail bridge
12over south branch of Roaring Creek

 

13Project Allocation

300,000

14(Base Project Allocation - $300,000)

 

15(11) Somerset County

 

16(i) Forbes State Forest

 

17(A) Replace bridge No.1 and culvert over
18Lick Hollow

 

19Project Allocation

200,000

20(Base Project Allocation - $200,000)

 

21(12) Sullivan County

 

22(i) Loyalsock State Forest

 

23(A) Replace Walker Road structure over
24east branch of Mill Creek

 

25Project Allocation

200,000

26(Base Project Allocation - $200,000)

 

27(B) Replace Rock Run Road structure over
28Loyalsock Creek

 

29Project Allocation

300,000

30(Base Project Allocation - $300,000)

 

1Section 11. Itemization of Motor License Fund projects.

2Projects in the category of Motor License Fund projects to be
3constructed by the Department of Transportation, its successors
4or assigns, and to be financed by current revenues are hereby
5itemized, together with their respective estimated costs, as
6follows:

7 

8Project

Total Project

Allocation

9(1) Adams County

 

10(i) Adams County Maintenance Facility

 

11(A) Construct new storage building,
12including site purchase, development,
13design and site work

 

14Project Allocation

3,000,000

15(Base Project Allocation - $1,750,000)

 

16(Land Allocation - $750,000)

 

17(Design & Contingencies - $500,000)

 

18(2) Allegheny County

 

19(i) Allegheny County Maintenance Facility

 

20(A) Construct new storage building,
21including site purchase, development,
22design and site work

 

23Project Allocation

3,000,000

24(Base Project Allocation - $2,400,000)

 

25(Land Allocation - $100,000)

 

26(Design & Contingencies - $500,000)

 

27(ii) Allegheny County Maintenance Garage

 

28(A) Develop new stockpile, including site
29purchase, development, design and
30construction of all required buildings

 

1Project Allocation

13,000,000

2(Base Project Allocation -
3$10,500,000)

 

4(Land Allocation - $2,000,000)

 

5(Design & Contingencies - $500,000)

 

6(iii) Allegheny County Stockpile Facility

 

7(A) Construct two new salt storage
8buildings

 

9Project Allocation

1,000,000

10(Base Project Allocation - $900,000)

 

11(Design & Contingencies - $100,000)

 

12(3) Armstrong County

 

13(i) Armstrong County Maintenance Facility

 

14(A) Develop new stockpile, including site
15purchase, development, design and
16construction of all required buildings

 

17Project Allocation

3,000,000

18(Base Project Allocation - $1,750,000)

 

19(Land Allocation - $750,000)

 

20(Design & Contingencies - $500,000)

 

21(4) Beaver County

 

22(i) Beaver County Maintenance Facility

 

23(A) Construct new storage building,
24including site purchase, development,
25design and site work

 

26Project Allocation

3,000,000

27(Base Project Allocation - $2,400,000)

 

28(Land Allocation - $100,000)

 

29(Design & Contingencies - $500,000)

 

30(ii) Beaver County Maintenance Garage

 

1(A) Construct new stockpile, including
2site purchase, development, design and
3construction of all required buildings

 

4Project Allocation

2,200,000

5(Base Project Allocation - $2,000,000)

 

6(Land Allocation - $100,000)

 

7(Design & Contingencies - $100,000)

 

8(5) Bedford County

 

9(i) Bedford County Maintenance Facility

 

10(A) Construct new stockpile, including
11site purchase, development, design and
12construction of all required buildings

 

13Project Allocation

3,000,000

14(Base Project Allocation - $2,400,000)

 

15(Land Allocation - $100,000)

 

16(Design & Contingencies - $500,000)

 

17(ii) Bedford County Stockpile Facility

 

18(A) Construct two new salt storage
19buildings

 

20Project Allocation

1,000,000

21(Base Project Allocation - $900,000)

 

22(Design & Contingencies - $100,000)

 

23(6) Blair County

 

24(i) Blair County Stockpile Facility

 

25(A) Construct two new salt storage
26buildings

 

27Project Allocation

1,000,000

28(Base Project Allocation - $900,000)

 

29(Design & Contingencies - $100,000)

 

30(7) Berks County

 

1(i) Berks County Maintenance Facility

 

2(A) Construct new storage building,
3including site purchase, development,
4design and site work

 

5Project Allocation

3,000,000

6(Base Project Allocation - $1,750,000)

 

7(Land Allocation - $750,000)

 

8(Design & Contingencies - $500,000)

 

9(8) Bucks County

 

10(i) Bucks County Maintenance Facility

 

11(A) Construct new storage building,
12including site purchase, development,
13design and site work

 

14Project Allocation

3,000,000

15(Base Project Allocation - $1,750,000)

 

16(Land Allocation - $750,000)

 

17(Design & Contingencies - $500,000)

 

18(9) Butler County

 

19(i) Butler County Maintenance Facility

 

20(A) Develop new stockpile, including site
21purchase, development, design and
22construction of all required buildings

 

23Project Allocation

3,000,000

24(Base Project Allocation - $1,750,000)

 

25(Land Allocation - $750,000)

 

26(Design & Contingencies - $500,000)

 

27(ii) Butler County Stockpile Facility

 

28(A) Construct new salt storage building

 

29Project Allocation

500,000

30(Base Project Allocation - $450,000)

 

1(Design & Contingencies - $50,000)

 

2(10) Cambria County

 

3(i) Cambria County Maintenance Garage

 

4(A) Construct new stockpile, including
5site purchase, development, design and
6construction of all required buildings

 

7Project Allocation

15,000,000

8(Base Project Allocation -
9$12,500,000)

 

10(Land Allocation - $2,000,000)

 

11(Design & Contingencies - $500,000)

 

12(11) Cameron County

 

13(i) Cameron County Bridgebeam Facility

 

14(A) Renovate and expand current facility,
15including upgrading building systems,
16roof repair and energy-efficiency
17measures

 

18Project Allocation

3,000,000

19(Base Project Allocation - $2,750,000)

 

20(Design & Contingencies - $250,000)

 

21(ii) Cameron County Maintenance Facility

 

22(A) Construct new storage building,
23including site purchase, development,
24design and site work

 

25Project Allocation

3,000,000

26(Base Project Allocation - $1,750,000)

 

27(Land Allocation - $750,000)

 

28(Design & Contingencies - $500,000)

 

29(iii) Cameron County Stockpile Facility

 

30(A) Construct new salt storage building

 

1Project Allocation

500,000

2(Base Project Allocation - $450,000)

 

3(Design & Contingencies - $50,000)

 

4(12) Carbon County

 

5(i) Carbon County Maintenance Facility

 

6(A) Construct new storage building,
7including site purchase, development,
8design and site work

 

9Project Allocation

3,000,000

10(Base Project Allocation - $1,750,000)

 

11(Land Allocation - $750,000)

 

12(Design & Contingencies - $500,000)

 

13(13) Centre County

 

14(i) Centre County Maintenance Facility

 

15(A) Construct new storage building,
16including site purchase, development,
17design and site work

 

18Project Allocation

3,000,000

19(Base Project Allocation - $1,750,000)

 

20(Land Allocation - $750,000)

 

21(Design & Contingencies - $500,000)

 

22(ii) Centre County Stockpile Facility

 

23(A) Construct new salt storage building

 

24Project Allocation

500,000

25(Base Project Allocation - $450,000)

 

26(Design & Contingencies - $50,000)

 

27(14) Chester County

 

28(i) Chester County Maintenance Facility

 

29(A) Construct new storage building,
30including site purchase, development,

 

1design and site work

 

2Project Allocation

3,000,000

3(Base Project Allocation - $1,750,000)

 

4(Land Allocation - $750,000)

 

5(Design & Contingencies - $500,000)

 

6(15) Clarion County

 

7(i) Clarion County Maintenance Garage

 

8(A) Construct new stockpile, including
9site purchase, development, design and
10construction of all required buildings

 

11Project Allocation

15,000,000

12(Base Project Allocation -
13$12,500,000)

 

14(Land Allocation - $2,000,000)

 

15(Design & Contingencies - $500,000)

 

16(ii) Clarion County Maintenance Facility

 

17(A) Construct new stockpile, including
18site purchase, development, design and
19construction of all required buildings

 

20Project Allocation

3,000,000

21(Base Project Allocation - $1,750,000)

 

22(Land Allocation - $750,000)

 

23(Design & Contingencies - $500,000)

 

24(iii) Clarion County Stockpile Facility

 

25(A) Construct new salt storage building

 

26Project Allocation

500,000

27(Base Project Allocation - $450,000)

 

28(Design & Contingencies - $50,000)

 

29(16) Clinton County

 

30(i) Clinton County Maintenance Facility

 

1(A) Renovate and expand storage building,
2including building systems, roof
3replacement and energy-efficiency
4measures

 

5Project Allocation

2,500,000

6(Base Project Allocation - $2,000,000)

 

7(Design & Contingencies - $500,000)

 

8(B) Construct new storage building,
9including site purchase, development,
10design and site work

 

11Project Allocation

3,000,000

12(Base Project Allocation - $1,750,000)

 

13(Land Allocation - $750,000)

 

14(Design & Contingencies - $500,000)

 

15(17) Columbia County

 

16(i) Columbia County Maintenance Facility

 

17(A) Develop new stockpile, including site
18purchase, development, design and
19construction of all required buildings

 

20Project Allocation

3,000,000

21(Base Project Allocation - $1,750,000)

 

22(Land Allocation - $750,000)

 

23(Design & Contingencies - $500,000)

 

24(18) Crawford County

 

25(i) Crawford County Bridgebeam Facility

 

26(A) Renovate and expand current facility,
27including upgrading building systems,
28roof repair and energy-efficiency
29measures

 

30Project Allocation

3,000,000

1(Base Project Allocation - $2,750,000)

 

2(Design & Contingencies - $250,000)

 

3(ii) Crawford County Maintenance Facility

 

4(A) Construct new storage building,
5including site purchase, development,
6design and site work

 

7Project Allocation

3,000,000

8(Base Project Allocation - $1,750,000)

 

9(Land Allocation - $750,000)

 

10(Design & Contingencies - $500,000)

 

11(iii) Crawford County Stockpile Facility

 

12(A) Construct new salt storage building

 

13Project Allocation

500,000

14(Base Project Allocation - $450,000)

 

15(Design & Contingencies - $50,000)

 

16(19) Cumberland County

 

17(i) Cumberland County Maintenance Facility

 

18(A) Construct new storage building,
19including site purchase, development,
20design and site work

 

21Project Allocation

3,000,000

22(Base Project Allocation - $1,750,000)

 

23(Land Allocation - $750,000)

 

24(Design & Contingencies - $500,000)

 

25(20) Dauphin County

 

26(i) Dauphin County Maintenance Facility

 

27(A) Construct new storage building,
28including site purchase, development,
29design and site work

 

30Project Allocation

3,000,000

1(Base Project Allocation - $1,750,000)

 

2(Land Allocation - $750,000)

 

3(Design & Contingencies - $500,000)

 

4(21) Delaware County

 

5(i) Delaware County Maintenance Facility

 

6(A) Construct new storage building,
7including site purchase, development,
8design and site work

 

9Project Allocation

3,000,000

10(Base Project Allocation - $1,750,000)

 

11(Land Allocation - $750,000)

 

12(Design & Contingencies - $500,000)

 

13(22) Elk County

 

14(i) Elk County Maintenance Garage

 

15(A) Renovate and expand storage building,
16including upgrading building systems,
17roof replacement and energy-efficiency
18measures

 

19Project Allocation

2,500,000

20(Base Project Allocation - $2,000,000)

 

21(Design & Contingencies - $500,000)

 

22(ii) Elk County Maintenance Facility

 

23(A) Develop new stockpile, including site
24purchase, development, design and
25construction of all required buildings

 

26Project Allocation

3,000,000

27(Base Project Allocation - $1,750,000)

 

28(Land Allocation - $750,000)

 

29(Design & Contingencies - $500,000)

 

30(23) Erie County

 

1(i) Erie County Maintenance Garage

 

2(A) Construct new storage building,
3including site purchase, development,
4design and site work

 

5Project Allocation

15,000,000

6(Base Project Allocation -
7$12,500,000)

 

8(Land Allocation - $2,000,000)

 

9(Design & Contingencies - $500,000)

 

10(ii) Erie County Stockpile Facility

 

11(A) Construct new salt storage building

 

12Project Allocation

500,000

13(Base Project Allocation - $450,000)

 

14(Design & Contingencies - $50,000)

 

15(24) Forest County

 

16(i) Forest County Maintenance Facility

 

17(A) Construct new storage building,
18including site purchase, development,
19design and site work

 

20Project Allocation

3,000,000

21(Base Project Allocation - $1,750,000)

 

22(Land Allocation - $750,000)

 

23(Design & Contingencies - $500,000)

 

24(25) Franklin County

 

25(i) Franklin County Maintenance Facility

 

26(A) Construct new storage building,
27including site purchase, development,
28design and site work

 

29Project Allocation

3,000,000

30(Base Project Allocation - $1,750,000)

 

1(Land Allocation - $750,000)

 

2(Design & Contingencies - $500,000)

 

3(26) Fulton County

 

4(i) Fulton County Maintenance Facility

 

5(A) Construct new storage building,
6including site purchase, development,
7design and site work

 

8Project Allocation

3,000,000

9(Base Project Allocation - $2,400,000)

 

10(Land Allocation - $100,000)

 

11(Design & Contingencies - $500,000)

 

12(ii) Fulton County Maintenance Garage

 

13(A) Develop new stockpile, including site
14purchase, development, design and
15construction of all required buildings

 

16Project Allocation

16,000,000

17(Base Project Allocation -
18$13,500,000)

 

19(Land Allocation - $2,000,000)

 

20(Design & Contingencies - $500,000)

 

21(iii) Fulton County Stockpile Facility

 

22(A) Construct two new salt storage
23buildings

 

24Project Allocation

1,000,000

25(Base Project Allocation - $900,000)

 

26(Design & Contingencies - $100,000)

 

27(27) Greene County

 

28(i) Greene County Maintenance Facility

 

29(A) Construct new storage building,
30including site purchase, development,

 

1design and site work

 

2Project Allocation

3,000,000

3(Base Project Allocation - $2,400,000)

 

4(Land Allocation - $100,000)

 

5(Design & Contingencies - $500,000)

 

6(ii) Green County Maintenance Garage

 

7(A) Construct new stockpile, including
8site purchase, development, design and
9construction of all required buildings

 

10Project Allocation

15,000,000

11(Base Project Allocation -
12$12,500,000)

 

13(Land Allocation - $2,000,000)

 

14(Design & Contingencies - $500,000)

 

15(iii) Greene County Stockpile Facility

 

16(A) Construct two new salt storage
17buildings

 

18Project Allocation

1,000,000

19(Base Project Allocation - $900,000)

 

20(Design & Contingencies - $100,000)

 

21(28) Huntingdon County

 

22(i) Huntingdon County Maintenance Facility

 

23(A) Construct new storage building,
24including site purchase, development,
25design and site work

 

26Project Allocation

3,000,000

27(Base Project Allocation - $2,400,000)

 

28(Land Allocation - $100,000)

 

29(Design & Contingencies - $500,000)

 

30(29) Indiana County

 

1(i) Indiana County Maintenance Garage

 

2(A) Develop new stockpile, including site
3purchase, development, design and
4construction of all required buildings

 

5Project Allocation

15,000,000

6(Base Project Allocation -
7$12,500,000)

 

8(Land Allocation - $2,000,000)

 

9(Design & Contingencies - $500,000)

 

10(ii) Indiana County Stockpile Facility

 

11(A) Construct new salt storage building

 

12Project Allocation

500,000

13(Base Project Allocation - $450,000)

 

14(Design & Contingencies - $50,000)

 

15(30) Jefferson County

 

16(i) Jefferson County Maintenance Facility

 

17(A) Construct new stockpile, including
18site purchase, development, design and
19construction of all required buildings

 

20Project Allocation

3,000,000

21(Base Project Allocation - $1,750,000)

 

22(Land Allocation - $750,000)

 

23(Design & Contingencies - $500,000)

 

24(ii) Jefferson County Maintenance Garage

 

25(A) Construct new stockpile, including
26site purchase, development, design and

27construction of all required buildings

 

28Project Allocation

15,000,000

29(Base Project Allocation -
30$12,500,000)

 

1(Land Allocation - $2,000,000)

 

2(Design & Contingencies - $500,000)

 

3(iii) Jefferson County Stockpile Facility

 

4(A) Construct new salt storage building

 

5Project Allocation

500,000

6(Base Project Allocation - $450,000)

 

7(Design & Contingencies - $50,000)

 

8(31) Juniata County

 

9(i) Juniata County Maintenance Facility

 

10(A) Construct new stockpile, including
11site purchase, development, design and
12construction of all required buildings

 

13Project Allocation

3,000,000

14(Base Project Allocation - $1,750,000)

 

15(Land Allocation - $750,000)

 

16(Design & Contingencies - $500,000)

 

17(ii) Juniata County Maintenance Garage

 

18(A) Renovate and expand storage building,
19including building systems, roof
20replacement and energy-efficiency
21measures

 

22Project Allocation

15,000,000

23(Base Project Allocation -
24$12,500,000)

 

25(Land Allocation - $2,000,000)

 

26(Design & Contingencies - $500,000)

 

27(iii) Juniata County Stockpile Facility

 

28(A) Construct new salt storage building

 

29Project Allocation

500,000

30(Base Project Allocation - $450,000)

 

1(Design & Contingencies - $50,000)

 

2(32) Lackawanna County

 

3(i) Lackawanna County Maintenance Facility

 

4(A) Construct new storage building,
5including site purchase, development,
6design and site work

 

7Project Allocation

3,000,000

8(Base Project Allocation - $1,750,000)

 

9(Land Allocation - $750,000)

 

10(Design & Contingencies - $500,000)

 

11(33) Lancaster County

 

12(i) Lancaster County Maintenance Facility

 

13(A) Construct new storage building,
14including site purchase, development,
15design and site work

 

16Project Allocation

3,000,000

17(Base Project Allocation - $1,750,000)

 

18(Land Allocation - $750,000)

 

19(Design & Contingencies - $500,000)

 

20(34) Lawrence County

 

21(i) Lawrence County Stockpile Facility

 

22(A) Construct two new salt storage
23buildings

 

24Project Allocation

1,000,000

25(Base Project Allocation - $900,000)

 

26(Design & Contingencies - $100,000)

 

27(35) Lebanon County

 

28(i) Lebanon County Maintenance Facility

 

29(A) Construct new storage building,
30including site purchase, development,

 

1design and site work

 

2Project Allocation

3,000,000

3(Base Project Allocation - $1,750,000)

 

4(Land Allocation - $750,000)

 

5(Design & Contingencies - $500,000)

 

6(36) Lehigh County

 

7(i) Lehigh County Maintenance Facility

 

8(A) Construct new storage building,
9including site purchase, development,
10design and site work

 

11Project Allocation

3,000,000

12(Base Project Allocation - $1,750,000)

 

13(Land Allocation - $750,000)

 

14(Design & Contingencies - $500,000)

 

15(37) Lycoming County

 

16(i) Lycoming County Maintenance Facility

 

17(A) Construct new stockpile, including
18site purchase, development, design and
19construction of all required buildings

 

20Project Allocation

3,000,000

21(Base Project Allocation - $1,750,000)

 

22(Land Allocation - $750,000)

 

23(Design & Contingencies - $500,000)

 

24(38) McKean County

 

25(i) McKean County Maintenance Facility

 

26(A) Construct new storage building,
27including site purchase, development,
28design and site work

 

29Project Allocation

3,000,000

30(Base Project Allocation - $1,750,000)

 

1(Land Allocation - $750,000)

 

2(Design & Contingencies - $500,000)

 

3(ii) McKean County Maintenance Garage

 

4(A) Construct new stockpile, including
5site purchase, development, design and
6construction of all required buildings

 

7Project Allocation

14,000,000

8(Base Project Allocation -
9$12,500,000)

 

10(Land Allocation - $1,000,000)

 

11(Design & Contingencies - $500,000)

 

12(39) Mercer County

 

13(i) Mercer County Bridgebeam Facility

 

14(A) Renovate and expand current facility,
15including upgrading building systems,
16roof repair and energy-efficiency
17measures

 

18Project Allocation

3,000,000

19(Base Project Allocation - $2,750,000)

 

20(Design & Contingencies - $250,000)

 

21(40) Mifflin County

 

22(i) Mifflin County Maintenance Facility

 

23(A) Construct new stockpile, including
24site purchase, development, design and
25construction of all required buildings

 

26Project Allocation

3,000,000

27(Base Project Allocation - $1,750,000)

 

28(Land Allocation - $750,000)

 

29(Design & Contingencies - $500,000)

 

30(ii) Mifflin County Stockpile Facility

 

1(A) Construct new salt storage building

 

2Project Allocation

500,000

3(Base Project Allocation - $450,000)

 

4(Design & Contingencies - $50,000)

 

5(41) Monroe County

 

6(i) Monroe County Maintenance Facility

 

7(A) Construct new storage building,
8including site purchase, development,
9design and site work

 

10Project Allocation

3,000,000

11(Base Project Allocation - $1,750,000)

 

12(Land Allocation - $750,000)

 

13(Design & Contingencies - $500,000)

 

14(42) Montgomery County

 

15(i) Montgomery County 6-0 Parking Garage

 

16(A) Renovate and repair existing parking
17garage

 

18Project Allocation

4,000,000

19(Base Project Allocation - $3,600,000)

 

20(Design & Contingencies - $400,000)

 

21(ii) Montgomery County 6-0 District Office

 

22(A) Install standby generator capable of
23running entire facility

 

24Project Allocation

2,500,000

25(Base Project Allocation - $2,250,000)

 

26(Design & Contingencies - $250,000)

 

27(iii) Montgomery County Maintenance Facility

 

28(A) Construct new storage building,
29including site purchase, development,
30design and site work

 

1Project Allocation

3,000,000

2(Base Project Allocation - $1,750,000)

 

3(Land Allocation - $750,000)

 

4(Design & Contingencies - $500,000)

 

5(43) Montour County

 

6(i) Montour County Maintenance Facility

 

7(A) Construct new stockpile, including
8site purchase, development, design and
9construction of all required buildings

 

10Project Allocation

3,000,000

11(Base Project Allocation - $1,750,000)

 

12(Land Allocation - $750,000)

 

13(Design & Contingencies - $500,000)

 

14(44) Northampton County

 

15(i) Northampton County Maintenance Facility

 

16(A) Construct new storage building,
17including site purchase, development,
18design and site work

 

19Project Allocation

3,000,000

20(Base Project Allocation - $1,750,000)

 

21(Land Allocation - $750,000)

 

22(Design & Contingencies - $500,000)

 

23(45) Northumberland County

 

24(i) Northumberland County Bridgebeam Facility

 

25(A) Renovate and expand current facility,
26including upgrading building systems,
27roof repair and energy-efficiency
28measures

 

29Project Allocation

3,000,000

30(Base Project Allocation - $2,750,000)

 

1(Design & Contingencies - $250,000)

 

2(ii) Northumberland County Maintenance
3Facility

 

4(A) Construct new stockpile, including
5site purchase, development, design and
6construction of all required buildings

 

7Project Allocation

3,000,000

8(Base Project Allocation - $1,750,000)

 

9(Land Allocation - $750,000)

 

10(Design & Contingencies - $500,000)

 

11(46) Perry County

 

12(i) Perry County Maintenance Facility

 

13(A) Construct new storage building,
14including site purchase, development,
15design and site work

 

16Project Allocation

3,000,000

17(Base Project Allocation - $1,750,000)

 

18(Land Allocation - $750,000)

 

19(Design & Contingencies - $500,000)

 

20(47) Philadelphia County

 

21(i) Philadelphia County Maintenance Facility

 

22(A) Construct new storage building,
23including site purchase, development,
24design and site work

 

25Project Allocation

3,000,000

26(Base Project Allocation - $1,750,000)

 

27(Land Allocation - $750,000)

 

28(Design & Contingencies - $500,000)

 

29(48) Pike County

 

30(i) Pike County Maintenance Facility

 

1(A) Construct new storage building,
2including site purchase, development,
3design and site work

 

4Project Allocation

3,000,000

5(Base Project Allocation - $1,750,000)

 

6(Land Allocation - $750,000)

 

7(Design & Contingencies - $500,000)

 

8(49) Potter County

 

9(i) Potter County Maintenance Facility

 

10(A) Construct new stockpile, including
11site purchase, development, design and
12construction of all required buildings

 

13Project Allocation

3,000,000

14(Base Project Allocation - $1,750,000)

 

15(Land Allocation - $750,000)

 

16(Design & Contingencies - $500,000)

 

17(50) Schuylkill County

 

18(i) Schuylkill County Maintenance Facility

 

19(A) Construct new storage building,
20including site purchase, development,
21design and site work

 

22Project Allocation

3,000,000

23(Base Project Allocation - $1,750,000)

 

24(Land Allocation - $750,000)

 

25(Design & Contingencies - $500,000)

 

26(51) Snyder County

 

27(i) Snyder County Maintenance Garage

 

28(A) Renovate and expand storage building,
29including upgrading building systems,
30roof repair and energy-efficiency

 

1measures

 

2Project Allocation

2,500,000

3(Base Project Allocation - $2,000,000)

 

4(Design & Contingencies - $500,000)

 

5(ii) Snyder County Maintenance Facility

 

6(A) Construct new stockpile, including
7site purchase, development, design and
8construction of all required buildings

 

9Project Allocation

3,000,000

10(Base Project Allocation - $1,750,000)

 

11(Land Allocation - $750,000)

 

12(Design & Contingencies - $500,000)

 

13(52) Somerset County

 

14(i) Somerset County Maintenance Facility

 

15(A) Construct new storage facility,
16including site purchase, development,
17design and site work

 

18Project Allocation

2,200,000

19(Base Project Allocation - $1,600,000)

 

20(Land Allocation - $100,000)

 

21(Design & Contingencies - $500,000)

 

22(ii) Somerset County Maintenance Garage

 

23(A) Construct new stockpile, including
24site purchase, development, design and
25construction of all required buildings

 

26Project Allocation

15,000,000

27(Base Project Allocation -
28$12,500,000)

 

29(Land Allocation - $2,000,000)

 

30(Design & Contingencies - $500,000)

 

1(iii) Somerset County Stockpile Facility

 

2(A) Construct two new salt storage
3buildings

 

4Project Allocation

1,000,000

5(Base Project Allocation - $900,000)

 

6(Land Allocation - $100,000)

 

7(53) Sullivan County

 

8(i) Sullivan County Maintenance Facility

 

9(A) Construct new stockpile, including
10site purchase, development, design and
11construction of all required buildings

 

12Project Allocation

3,000,000

13(Base Project Allocation - $1,750,000)

 

14(Land Allocation - $750,000)

 

15(Design & Contingencies - $500,000)

 

16(54) Susquehanna County

 

17(i) Susquehanna County Maintenance Facility

 

18(A) Construct new storage building,
19including site purchase, development,
20design and site work

 

21Project Allocation

3,100,000

22(Base Project Allocation - $1,750,000)

 

23(Land Allocation - $750,000)

 

24(Design & Contingencies - $600,000)

 

25(B) Construct new storage building,
26including site purchase, development,
27design and site work

 

28Project Allocation

1,500,000

29(Base Project Allocation - $975,000)

 

30(Land Allocation - $300,000)

 

1(Design & Contingencies - $225,000)

 

2(55) Tioga County

 

3(i) Tioga County Maintenance Facility

 

4(A) Construct new stockpile, including
5site purchase, development, design and
6construction of all required buildings

 

7Project Allocation

3,000,000

8(Base Project Allocation - $1,750,000)

 

9(Land Allocation - $750,000)

 

10(Design & Contingencies - $500,000)

 

11(56) Union County

 

12(i) Union County Maintenance Facility

 

13(A) Construct new stockpile, including
14site purchase, development, design and
15construction of all required buildings

 

16Project Allocation

3,000,000

17(Base Project Allocation - $1,750,000)

 

18(Land Allocation - $750,000)

 

19(Design & Contingencies - $500,000)

 

20(57) Venango County

 

21(i) Venango County Maintenance Facility

 

22(A) Construct new storage building,
23including site purchase, development,
24design and site work

 

25Project Allocation

3,000,000

26(Base Project Allocation - $1,750,000)

 

27(Land Allocation - $750,000)

 

28(Design & Contingencies - $500,000)

 

29(58) Warren County

 

30(i) Warren County Bridgebeam Facility

 

1(A) Renovate and expand current facility,
2including upgrading building systems,
3roof repair and energy-efficiency
4measures

 

5Project Allocation

3,000,000

6(Base Project Allocation - $2,750,000)

 

7(Design & Contingencies - $250,000)

 

8(ii) Warren County Maintenance Facility

 

9(A) Construct new storage building,
10including site purchase, development,
11design and site work

 

12Project Allocation

3,000,000

13(Base Project Allocation - $1,750,000)

 

14(Land Allocation - $750,000)

 

15(Design & Contingencies - $500,000)

 

16(iii) Warren County Maintenance Garage

 

17(A) Construct new stockpile, including
18site purchase, development, design and
19construction of all required buildings

 

20Project Allocation

15,000,000

21(Base Project Allocation -
22$12,500,000)

 

23(Land Allocation - $2,000,000)

 

24(Design & Contingencies - $500,000)

 

25(59) Washington County

 

26(i) Washington County Stockpile Facility

 

27(A) Construct two new salt storage
28buildings

 

29Project Allocation

1,000,000

30(Base Project Allocation - $900,000)

 

1(Design & Contingencies - $100,000)

 

2(60) Wayne County

 

3(i) Wayne County Maintenance Facility

 

4(A) Construct new storage building,
5including site purchase, development,
6design and site work

 

7Project Allocation

3,000,000

8(Base Project Allocation - $1,750,000)

 

9(Land Allocation - $750,000)

 

10(Design & Contingencies - $500,000)

 

11(ii) Wayne County Maintenance Garage

 

12(A) Resurface garage floors and perform
13any necessary repairs

 

14Project Allocation

500,000

15(Base Project Allocation - $450,000)

 

16(Design & Contingencies - $50,000)

 

17(61) Westmoreland County

 

18(i) Westmoreland County Maintenance Facility

 

19(A) Construct new salt storage building

 

20Project Allocation

6,000,000

21(Base Project Allocation - $5,500,000)

 

22(Design & Contingencies - $500,000)

 

23(B) Construct new storage building,
24including site purchase, development,
25design and site work

 

26Project Allocation

3,000,000

27(Base Project Allocation - $2,400,000)

 

28(Land Allocation - $100,000)

 

29(Design & Contingencies - $500,000)

 

30(ii) Westmoreland County Stockpile Facility

 

1(A) Construct two new salt storage
2buildings

 

3Project Allocation

1,000,000

4(Base Project Allocation - $900,000)

 

5(Design & Contingencies - $100,000)

 

6(62) Wyoming County

 

7(i) Wyoming County Maintenance Facility

 

8(A) Construct new storage building,
9including site purchase, development,
10design and site work

 

11Project Allocation

3,000,000

12(Base Project Allocation - $1,750,000)

 

13(Land Allocation - $750,000)

 

14(Design & Contingencies - $500,000)

 

15(63) York County

 

16(i) York County Maintenance Facility

 

17(A) Construct new storage building,
18including site purchase, development,
19design and site work

 

20Project Allocation

3,000,000

21(Base Project Allocation - $1,750,000)

 

22(Land Allocation - $750,000)

 

23(Design & Contingencies - $500,000)

 

24(64) Various Counties

 

25(i) Bridgebeam Facilities

 

26(A) Design and construct three new
27bridgebeam fabrication facilities

 

28Project Allocation

9,000,000

29(Base Project Allocation - $8,100,000)

 

30(Design & Contingencies - $900,000)

 

1Section 12. Debt authorization.

2(a) Public improvements.--The Governor, Auditor General and
3State Treasurer are hereby authorized and directed to borrow
4from time to time in addition to any authorization heretofore or
5hereafter enacted, on the credit of the Commonwealth, subject to
6the limitations provided in the current capital budget, money
7not exceeding in the aggregate the sum of $565,191,000.

8(b) Furniture and equipment.--The Governor, Auditor General
9and State Treasurer are hereby authorized and directed to borrow
10from time to time in addition to any authorization heretofore or
11hereafter enacted on the credit of the Commonwealth, subject to
12the limitations provided in the current capital budget, money
13not exceeding in the aggregate the sum of $1,600,000 as may be
14found necessary to carry out the acquisition and construction of
15the public improvement projects consisting of the acquisition of
16original movable furniture and equipment specifically itemized
17in the capital budget.

18(c) Transportation assistance.--The Governor, Auditor
19General and State Treasurer are hereby authorized and directed
20to borrow from time to time in addition to any authorization
21heretofore or hereafter enacted, on the credit of the
22Commonwealth, subject to the limitations provided in the current
23capital budget, money not exceeding in the aggregate the sum of
24$451,893,000 as may be found necessary to carry out the
25acquisition and construction of the transportation assistance
26projects specifically itemized in a capital budget.

27(d) Redevelopment assistance.--Subject to the limitation in
28section 317(b) of the act of February 9, 1999 (P.L.1, No.1),
29known as the Capital Facilities Debt Enabling Act, the Governor,
30Auditor General and State Treasurer are hereby authorized and

1directed to borrow from time to time in addition to any
2authorization heretofore or hereafter enacted, on the credit of
3the Commonwealth, subject to the limitations provided in the
4current capital budget, money not exceeding in the aggregate the
5sum of $787,027,000 as may be found necessary to carry out the
6redevelopment assistance capital projects specifically itemized
7in a capital budget.

8(e) Flood control.--The Governor, Auditor General and State
9Treasurer are hereby authorized and directed to borrow from time
10to time in addition to an authorization heretofore or hereafter
11enacted, on the credit of the Commonwealth, subject to the
12limitations provided in the current capital budget, money not
13exceeding in the aggregate the sum of $48,205,000 as may be
14found necessary to carry out the acquisition and construction of
15the flood control projects specifically itemized in a capital
16budget.

17Section 13. Issue of bonds.

18The indebtedness authorized in this act shall be incurred
19from time to time and shall be evidenced by one or more series
20of general obligation bonds of the Commonwealth in such
21aggregate principal amount for each series as the Governor, the
22Auditor General and the State Treasurer shall determine, but the
23latest stated maturity date shall not exceed estimated useful
24life of the projects being financed as stated in section 14.

25Section 14. Estimated useful life and term of debt.

26(a) Estimated useful life.--The General Assembly states that
27the estimated useful life of the public improvement projects
28itemized in this act is as follows:

29(1) Public improvement projects, 30 years.

30(2) Furniture and equipment, 10 years.

1(3) Transportation assistance projects:

2(i) Rolling stock, 15 years.

3(ii) Passenger buses, 12 years.

4(iii) Furniture and equipment, 10 years.

5(iv) All others, 30 years.

6(b) Term of debt.--The maximum term of the debt authorized
7to be incurred under this act is 30 years.

8Section 15. Appropriations.

9(a) Public improvements.--The net proceeds of the sale of
10the obligations authorized in this act are hereby appropriated
11from the Capital Facilities Fund to the Department of General
12Services in the maximum amount of $565,191,000 to be used by it
13exclusively to defray the financial cost of the public
14improvement projects specifically itemized in a capital budget.
15After reserving or paying the expenses of the sale of the
16obligation, the State Treasurer shall pay to the Department of
17General Services the moneys as required and certified by it to
18be legally due payable.

19(b) Furniture and equipment.--The net proceeds of the sale
20of the obligations authorized in this act are hereby
21appropriated from the Capital Facilities Fund to the Department
22of General Services in the maximum amount of $1,600,000 to be
23used by it exclusively to defray the financial cost of the
24public improvement projects consisting of the acquisition of
25original movable furniture and equipment specifically itemized
26in a capital budget. After reserving or paying the expenses of
27the sale of the obligation, the State Treasurer shall pay to the
28Department of General Services the moneys as required and
29certified by it to be legally due and payable.

30(c) Transportation assistance.--The net proceeds of the sale

1of the obligations authorized in this act are hereby
2appropriated from the Capital Facilities Fund to the Department
3of Transportation in the maximum amount of $451,893,000 to be
4used by it exclusively to defray the financial cost of the
5transportation assistance projects specifically itemized in a
6capital budget. After reserving or paying the expenses of the
7sale of the obligation, the State Treasurer shall pay to the
8Department of Transportation the moneys as required and
9certified by it to be legally due and payable.

10(d) Redevelopment assistance.--The net proceeds of the sale
11of the obligations authorized in this act are hereby
12appropriated from the Capital Facilities Fund to the Department
13of Community and Economic Development in the maximum amount of
14$787,027,000 to be used by it exclusively to defray the
15financial cost of the redevelopment assistance capital projects
16specifically itemized in a capital budget. After reserving or
17paying the expenses of the sale of the obligation, the State
18Treasurer shall pay to the Department of Community and Economic
19Development the moneys as required and certified by it to be
20legally due and payable.

21(e) Flood control.--The net proceeds of the sale of the
22obligations authorized in this act are hereby appropriated from
23the Capital Facilities Fund to the Department of Environmental
24Protection in the maximum amount of $48,205,000 to be used by it
25exclusively to defray the financial cost of the flood control
26projects specifically itemized in a capital budget. After
27reserving or paying the expenses of the sale of the obligation,
28the State Treasurer shall pay to the Department of Environmental
29Protection the moneys as required and certified by it to be
30legally due and payable.

1Section 16. Federal funds.

2(a) Projects itemized in this act.--All moneys received from
3the Federal Government for the projects specifically itemized in
4this act are also hereby appropriated for those projects.

5(b) Projects not requiring itemization.--Department of
6Military and Veterans Affairs construction projects which are
7totally federally funded and to be administered by the
8Department of General Services are hereby authorized.

9Section 17. Editorial changes.

10In editing and preparing this act for printing following the
11final enactment, the Legislative Reference Bureau shall insert
12or revise letters or numbers for projects where the letters or
13numbers are missing or require revision. The Legislative
14Reference Bureau shall also revise the total monetary amounts
15for the total authorization, debt authorization, appropriations
16and department totals as necessary to agree with the total
17monetary amounts of the projects.

18Section 18. Effective date.

19This act shall take effect immediately.