PRIOR PRINTER'S NO. 4012

PRINTER'S NO.  4221

  

THE GENERAL ASSEMBLY OF PENNSYLVANIA

  

HOUSE BILL

 

No.

2619

Session of

2010

  

  

INTRODUCED BY PRESTON, BROOKS, CALTAGIRONE, ELLIS, GIBBONS, HALUSKA, HESS, HUTCHINSON, JOSEPHS, KOTIK, LONGIETTI, MARSHALL, MATZIE, PASHINSKI, RAPP, REICHLEY, SAINATO, SAYLOR, SIPTROTH, STEVENSON AND BARBIN, JUNE 29, 2010

  

  

AS REPORTED FROM COMMITTEE ON CONSUMER AFFAIRS, HOUSE OF REPRESENTATIVES, AS AMENDED, SEPTEMBER 14, 2010   

  

  

  

AN ACT

  

1

Amending Titles 53 (Municipalities Generally) and 66 (Public

2

Utilities) of the Pennsylvania Consolidated Statutes,

3

providing for municipal aggregation of electric generation

4

supply.

5

The General Assembly of the Commonwealth of Pennsylvania

6

hereby enacts as follows:

7

Section 1.  Part V of Title 53 of the Pennsylvania

8

Consolidated Statutes is amended by adding a chapter to read:

9

CHAPTER 61

10

MUNICIPAL AGGREGATION OF

11

ELECTRIC GENERATION SUPPLY

12

Sec.

13

6101.  Legislative purpose.

14

6102.  Definitions.

15

6103.  Grant of authority.

16

6104.  Intergovernmental cooperation.

17

6105.  Limitations.

 


1

§ 6101.  Legislative purpose.

2

The purpose of this chapter is to grant legislative authority

3

for any municipality to act as a municipal aggregator of

4

electricity under 66 Pa.C.S. Ch. 28 (relating to restructuring

5

of electric utility industry) and to provide municipal

6

aggregation of electric generation supply to consumers of

7

electricity within its municipal boundaries.

8

§ 6102.  Definitions.

9

The following words and phrases when used in this chapter

10

shall have the meanings given to them in this section unless the

11

context clearly indicates otherwise:

12

"Consumer."  As defined in 66 Pa.C.S. § 2803 (relating to

13

definitions).

14

"Commission."  The Pennsylvania Public Utility Commission.

15

"Default service plan."  As defined in 66 Pa.C.S. § 2803

16

(relating to definitions).

17

"Electric generation supplier."  As defined in 66 Pa.C.S.

18

§ 2803 (relating to definitions).

19

"Municipal aggregation program."  As defined in 66 Pa.C.S.

20

§ 2803 (relating to definitions).

21

"Municipal aggregator of electricity."  As defined in 66

22

Pa.C.S. § 2803 (relating to definitions).

23

"Municipality."  As defined in 66 Pa.C.S. § 2803 (relating to

24

definitions).

25

"Price-to-compare."  As defined in 66 Pa.C.S. § 2803

26

(relating to definitions).

27

"Small commercial customer."  As defined in 66 Pa.C.S. § 2803

28

(relating to definitions).

29

§ 6103.  Grant of authority.

30

(a)  Authority.--Except as provided under subsection (b) and

- 2 -

 


1

notwithstanding any law, a municipality is authorized to:

2

(1)  Be a municipal aggregator of electricity and provide

3

opt-in or opt-out municipal aggregation of electric

4

generation supply.

5

(2)  Be licensed by the commission as an electric

6

generation supplier.

7

(b)  Exception.--A municipality may only act as a municipal

8

aggregator of electricity on behalf of consumers within its

9

geographic boundaries.

10

§ 6104.  Intergovernmental cooperation.

11

Any two or more municipalities may cooperate and exercise the

12

authority to jointly act as a municipal aggregator of electric

13

generation supply in accordance with Subpart D of Part III

14

(relating to area government and intergovernmental cooperation).

15

§ 6105.  Limitations.

16

The authority granted to municipalities under this chapter

17

shall be limited by 66 Pa.C.S. § 2806.3 (relating to municipal

18

aggregation of electric generation supply) and any regulations

19

promulgated under 66 Pa.C.S. § 2806.3 by the commission.

20

Section 2.  Section 2803 of Title 66 is amended to read:

21

§ 2803.  Definitions.

22

The following words and phrases when used in this chapter

23

shall have the meanings given to them in this section unless the

24

context clearly indicates otherwise:

25

"Aggregator" or "market aggregator."  An entity, licensed by

26

the commission, that purchases electric energy and takes title

27

to electric energy as an intermediary for sale to retail

28

customers. The term shall not include a municipal aggregator of

29

electricity.

30

"Bilateral contract."  An agreement, as approved by the

- 3 -

 


1

commission, reached by two parties, each acting in its own

2

independent self-interest, as a result of negotiations free of

3

undue influence, duress or favoritism, in which the electric

4

energy supplier agrees to sell and the electric distribution

5

company agrees to buy a quantity of electric energy at a

6

specified price for a specified period of time under terms

7

agreed to by both parties, and which follows a standard industry

8

template widely accepted in the industry or variations thereto

9

accepted by the parties. Standard industry templates may include

10

the EEI Master Agreement for physical energy purchases and sales

11

and the ISDA Master Agreement for financial energy purchases and

12

sales.

13

"Broker" or "marketer."  An entity, licensed by the

14

commission, that acts as an agent or intermediary in the sale

15

and purchase of electric energy but that does not take title to

16

electric energy. The term shall include a municipal aggregator

17

of electricity.

18

"Competitive transition charge."  A nonbypassable charge

19

applied to the bill of every customer accessing the transmission

20

or distribution network which (charge) is designed to recover an

21

electric utility's transition or stranded costs as determined by

22

the commission under sections 2804 (relating to standards for

23

restructuring of electric industry) and 2808 (relating to

24

competitive transition charge).

25

"Consumer."  A retail electric customer.

26

"Customer."  A retail electric customer.

27

"Default service plan."  A plan for competitive procurement

28

of default service supply approved by the commission under 66

29

Pa.C.S. § 2807(e)(3.6) (relating to duties of electric

30

distribution companies).

- 4 -

 


1

"Default service provider."  An electric distribution company

2

within its certified service territory or an alternative

3

supplier approved by the commission that provides generation

4

service to retail electric customers who:

5

(1)  contract for electric power, including energy and

6

capacity, and the chosen electric generation supplier does

7

not supply the service; or

8

(2)  do not choose an alternative electric generation

9

supplier.

10

"Direct access."  The right of electric generation suppliers

11

and end-use customers to utilize and interconnect with the

12

electric transmission and distribution system on a

13

nondiscriminatory basis at rates, terms and conditions of

14

service comparable to the transmission and distribution

15

companies' own use of the system to transport electricity from

16

any generator of electricity to any end-use customer.

17

"Electric distribution company."  The public utility

18

providing facilities for the jurisdictional transmission and

19

distribution of electricity to retail customers, except building

20

or facility owners/operators that manage the internal

21

distribution system serving such building or facility and that

22

supply electric power and other related electric power services

23

to occupants of the building or facility.

24

"Electric generation supplier" or "electricity supplier." A

25

person or corporation, including municipal corporations which

26

choose to provide service outside their municipal limits except

27

to the extent provided prior to the effective date of this

28

chapter, brokers and marketers, aggregators, municipal

29

aggregators of electricity implementing municipal aggregation

30

programs or any other entities, that sells to end-use customers

- 5 -

 


1

electricity or related services utilizing the jurisdictional

2

transmission or distribution facilities of an electric

3

distribution company or that purchases, brokers, arranges or

4

markets electricity or related services for sale to end-use

5

customers utilizing the jurisdictional transmission and

6

distribution facilities of an electric distribution company. The

7

term excludes building or facility owner/operators that manage

8

the internal distribution system serving such building or

9

facility and that supply electric power and other related power

10

services to occupants of the building or facility. The term

11

excludes electric cooperative corporations except as provided in

12

15 Pa.C.S. Ch. 74 (relating to generation choice for customers

13

of electric cooperatives).

14

"End-use customer."  A retail electric customer.

15

"Municipal aggregation contract."  A written agreement

16

between a municipal aggregator of electricity and an electric

17

generation supplier that includes:

18

(1)  Beginning and end dates of the contract period.

19

(2)  Electric generation rate for the contract period.

20

(3)  Opt-out and opt-in contract procedures.

21

(4)  Customer complaint processes.

22

(5)  Contact information for inquiries related to

23

municipal aggregation.

24

"Municipal aggregation program."  A program providing for a

25

municipality acting as a broker or marketer on behalf of the

26

eligible consumers within the municipality's geographic

27

boundaries not excluded by section 2806.3 (relating to municipal

28

aggregation of electric generation supply). A program may be

29

either:

30

(1)  an opt-out program, which shall include every

- 6 -

 


1

eligible consumer who does not choose to be excluded from the

2

program; or

3

(2)  an opt-in program, which shall include only those

4

eligible consumers who choose to participate in the program.

5

"Municipal aggregator of electricity."  A municipality,

6

licensed by the commission, that acts as a broker or marketer on

7

behalf of the eligible consumers within the municipality's

8

geographic boundaries under municipal aggregation.

9

"Municipality."  A county, city, township, town or borough.

10

The term shall include a municipality subject to the former act

11

of April 13, 1972 (P.L.184, No.62), known as the Home Rule

12

Charter and Optional Plans Law.

13

"Price-to-compare."  A line item that appears on a retail

14

customer's monthly bill for default service. The price-to-

15

compare is equal to the sum of all unbundled generation and

16

transmission related charges to a default service customer for

17

that month of service. The price-to-compare is a customer-

<--

18

specific price for a given month of service reflecting all cost

19

components that the customer avoids when choosing to take

20

electric generation service from an electric generation

21

supplier.

22

"Reliability."  Includes adequacy and security. As used in

23

this definition, "adequacy" means the provision of sufficient

24

generation, transmission and distribution capacity so as to

25

supply the aggregate electric power and energy requirements of

26

consumers, taking into account scheduled and unscheduled outages

27

of system facilities; and "security" means designing,

28

maintaining and operating a system so that it can handle

29

emergencies safely while continuing to operate.

30

"Renewable resource."  Includes technologies such as solar

- 7 -

 


1

photovoltaic energy, solar thermal energy, wind power, low-head

2

hydropower, geothermal energy, landfill and mine-based methane

3

gas, energy from waste and sustainable biomass energy.

4

"Retail customer."  A retail electric customer.

5

"Retail electric customer."  A direct purchaser of electric

6

power. The term excludes an occupant of a building or facility

7

where the owners/operators manage the internal distribution

8

system serving such building or facility and supply electric

9

power and other related power services to occupants of the

10

building or facility; where such owners/operators are direct

11

purchasers of electric power; and where the occupants are not

12

direct purchasers.

13

"Small commercial customer."  A retail electric customer that

14

receives electric service under a small commercial, small

15

industrial or small business rate classification, and whose

16

maximum registered peak load was less than 25 50 kW within the

<--

17

last 12 months.

18

"Transition or stranded costs."  An electric utility's known

19

and measurable net electric generation-related costs, determined

20

on a net present value basis over the life of the asset or

21

liability as part of its restructuring plan, which traditionally

22

would be recoverable under a regulated environment but which may

23

not be recoverable in a competitive electric generation market

24

and which the commission determines will remain following

25

mitigation by the electric utility. This term includes:

26

(1)  Regulatory assets and other deferred charges

27

typically recoverable under current regulatory practice, the

28

unfunded portion of the utility's projected nuclear

29

generating plant decommissioning costs and cost obligations

30

under contracts with nonutility generating projects which

- 8 -

 


1

have received a commission order, the recoverability of which

2

shall be determined under section 2808(c)(1) (relating to

3

competitive transition charge).

4

(2)  Prudently incurred costs related to cancellation,

5

buyout, buydown or renegotiation of nonutility generating

6

projects consistent with section 527 (relating to

7

cogeneration rules and regulations), the recoverability of

8

which shall be determined pursuant to section 2808(c)(2).

9

(3)  The following costs, the recoverability of which

10

shall be determined pursuant to section 2808(c)(3):

11

(i)  Net plant investments and costs attributable to

12

the utility's existing generation plants and facilities.

13

(ii)  The utility's disposal of spent nuclear fuel.

14

(iii)  The utility's long-term purchase power

15

commitments other than the costs defined in paragraphs

16

(1) and (2).

17

(iv)  Retirement costs attributable to the utility's

18

existing generating plants other than the costs defined

19

in paragraph (1).

20

(v)  Other transition costs of the utility, including

21

costs of employee severance, retraining, early

22

retirement, outplacement and related expenses, at

23

reasonable levels, for employees who are affected by

24

changes that occur as a result of the restructuring of

25

the electric industry occasioned by this chapter.

26

The term includes any costs attributable to physical plants no

27

longer used and useful because of the transition to retail

28

competition. The term excludes any amounts previously disallowed

29

by the commission as imprudently incurred. To the extent that

30

the recoverability of amounts that are sought to be included as

- 9 -

 


1

transition or stranded costs are subject to appellate review as

2

of the time of the commission determination, any determination

3

to include such costs shall be reversed to the extent required

4

by the results of that appellate review.

5

"Transmission and distribution costs."  All costs directly or

6

indirectly incurred to provide transmission and distribution

7

services to retail electric customers. This includes the return

8

of and return on facilities and other capital investments

9

necessary to provide transmission and distribution services and

10

associated operating expenses, including applicable taxes.

11

"Universal service and energy conservation."  Policies,

12

protections and services that help low-income customers to

13

maintain electric service. The term includes customer assistance

14

programs, termination of service protection and policies and

15

services that help low-income customers to reduce or manage

16

energy consumption in a cost-effective manner, such as the low-

17

income usage reduction programs, application of renewable

18

resources and consumer education.

19

Section 3.  Title 66 is amended by adding a section to read:

20

§ 2806.3.  Municipal aggregation of electric generation supply.

21

(a)  Licensing.--The commission, in accordance with its

22

regulations, within 30 days following receipt of an application,

23

may issue a license to a municipality as an electric generation

24

supplier to act as a municipal aggregator of electric generation

25

supply service for eligible consumers within the municipality's

26

geographic boundaries. A municipal aggregator of electricity

27

under this section shall not be considered a public utility or a

28

utility engaging in the wholesale purchase and resale of

29

electricity, and the provision of municipal aggregation shall

30

not be considered a wholesale utility transaction.

- 10 -

 


1

(b)  Ordinance required.--Prior to applying for an electric

2

generation supplier license with the commission, the governing

3

body of the municipality shall adopt an ordinance authorizing

4

the municipality to apply for an electric generation supplier

5

license to serve as a municipal aggregator of electricity,

6

indicate whether the municipal aggregation shall be an opt-in or

7

opt-out program and shall identify municipal officials by either

8

title of office or name, or their duly appointed designees,

9

authorized to execute documents with the commission on behalf of

10

the municipality. A municipal aggregator of electricity shall

11

provide reasonable public notice of municipal consideration of

12

any ordinance authorizing a municipal aggregation program, which

13

shall include newspaper publication on a monthly basis beginning

14

at least 90 days prior to the adoption of an ordinance

15

authorizing an opt-out program.

16

(c)  Municipal aggregation contracts.--

17

(1)  A municipal aggregator of electricity may negotiate

18

and enter into a contract for electric generation supply

19

services with an electric generation supplier. A municipal

20

aggregator of electricity shall use a competitive procurement

21

or request-for proposal process to select the electric

22

generation supplier, regardless of the generation fuel type,

23

location, technology or new or existing status of the

24

generation that the electric generation supplier will use to

25

supply the municipal aggregation. An executed municipal

26

aggregation contract shall not go into effect prior to filing

27

with the commission, and a copy of the filed contract shall

28

be provided to the electric distribution company whose

29

service territory includes the municipal aggregator. Each

30

contract shall include:

- 11 -

 


1

(i)  provisions for the timing of the distribution of

2

customer lists by the electric distribution company and

3

customer notices consistent with this section;

4

(ii)  a consumer education plan with appropriate

5

consumer education materials to inform consumers about

6

the existence of the municipal aggregation and the

7

highlights of the program, which shall be deployed

8

concurrently with the distribution of opt-in or opt-out

9

notices, as applicable; and

10

(iii)  a copy of the sample opt-in or opt-out notice

11

to be sent to consumers, which shall provide the

12

identification of the selected electric generation

13

supplier.

14

(2)  Any contract between a municipality and an electric

15

generation supplier executed under this section shall clearly

16

indicate whether it is for an opt-in or opt-out municipal

17

aggregation and the price that the contracted electric

18

generation supplier will charge customers for electric

19

generation supply, as well as the time period of the

20

contract. A contract executed under this section may not

<--

21

exceed three years. If the price is a fixed rate, the price

22

shall be expressed in cents per kilowatt hour. If the

23

contract provides for a percentage off of the default service

24

rate or any other type of pricing arrangement, an

25

understandable description of the amount of the percentage

26

discount or other pricing arrangement and how the rate may

27

change shall be provided. If the electric generation supplier

28

will charge different rates to different rate classes within

29

the municipality, the applicable rate to consumers within

30

each rate class shall be described.

- 12 -

 


1

(d)  Opt-out programs; notice and opt-out procedures.--

2

(1)  No consumer may be bound by a contract between a

3

municipal aggregator of electricity and an electric

4

generation supplier in opt-out municipal aggregation until

<--

5

not less than 30 days following the mailing of the opt-out

6

notices required under this subsection and the expiration of

7

any waiting period for a consumer to cancel the pending

8

change to the electric generation supplier following written

9

confirmation by the electric distribution company as

10

prescribed by regulation.. Customers receiving electric

<--

11

generation service under an opt-out municipal aggregation

12

program may switch to an electric generation supplier other

13

than the supplier to the municipal aggregation program at any

14

time without penalty, cancellation fees or other

15

restrictions, provided that the switch shall take place

16

pursuant to commission-approved switching procedures.

17

(2)  Any contract between a municipality and an electric

18

generation supplier executed under this section shall contain

19

procedures for addressing consumer disputes and complaints

20

related to supply services received pursuant to a municipal

21

aggregation program. The procedures shall be made available

22

to consumers, at least annually, in a clear and easily

23

understandable format. After a municipality executes a

24

contract for electric generation services, but prior to

25

including a consumer's electric account or accounts in an

26

opt-out municipal aggregation, a municipal aggregator of

27

electricity shall provide each eligible consumer with written

28

notice that the consumer's account will be automatically

29

included in the municipal aggregation unless the customer

30

affirmatively opts out of the municipal aggregation. The

- 13 -

 


1

notice, written in plain language, shall include all of the

2

following:

3

(i)  The date by which the customer must

<--

4

affirmatively opt out of the program. The date shall not

5

be less than 30 days following the mailing of the opt-out

6

notice.

7

(ii) (i)  A description of the ordinance adopted by

<--

8

the municipality authorizing it to apply for a license

9

from the commission, the competitive procurement process

10

under which offers for electric generation supply were

11

solicited, and a location where, during regular business

12

hours, consumers may view the ordinance and executed

13

contract free of charge or obtain a copy for a reasonable

14

fee.

15

(iii) (ii)  Disclosure of the price that the

<--

16

contracted electric generation supplier will charge

17

customers for electric generation service. If the price

18

is a fixed rate, the municipal aggregator of electricity

19

shall express the price in cents per kilowatt hour and

20

list the most recent applicable price-to-compare of the

21

default service provider in whose service territory the

22

municipality is located. If the contract provides for a

23

percentage off of the default service rate or any other

24

type of pricing arrangement, an understandable

25

description of the amount of the percentage discount or

26

other pricing arrangement and how the rate may change

27

shall be provided. If the electric generation supplier

28

charges different rates to different rate classes within

29

the municipality, the municipal aggregator of electricity

30

shall describe the applicable rate to consumers within

- 14 -

 


1

each rate class and the associated price-to-compare.

2

(iv) (iii)  An itemized list and explanation of all

<--

3

fees and charges that are not incorporated into the rates

4

charged for electric generation service that the electric

5

generation supplier will charge to the consumer for

6

participating in the municipal aggregation, including any

7

early termination penalties and any surcharges that may

<--

8

be assessed. Early termination penalties shall not apply

<--

9

to a consumer that moves outside the municipal aggregator

10

of electricity's geographic boundaries or that becomes

11

eligible for and remains in an electric distribution

12

company customer assistance program at the time of

13

termination.

14

(v) (iv)  Disclosure of the estimated service

<--

15

commencement date and notice that the consumer may opt

16

out of the municipal aggregation program at the end of

<--

17

the term of the municipal aggregation contract and prior

18

to the commencement of any subsequent municipal

19

aggregation contract any time.

<--

20

(vi) (v)  A statement informing consumers that if

<--

21

they choose to opt out of the municipal aggregation they

22

will be served by the default service offer established

23

under section 2807(e) (relating to duties of electric

24

distribution companies) until the consumer chooses an

25

alternative electric generation supplier or chooses to

26

participate in a subsequent municipal aggregation.

27

(vii) (vi)  A statement informing consumers that if

<--

28

they switch back to the default service provider they may

29

not be served under the same rates, terms and conditions

30

that apply to other customers within the municipal

- 15 -

 


1

aggregation.

2

(viii) (vii)  Disclosure of any credit, collection

<--

3

and deposit policies and requirements.

4

(ix) (viii)  Disclosure of any limitations or

<--

5

conditions on customer acceptance into the municipal

6

aggregation.

7

(x) (ix)  A description of the process and associated

<--

8

time period for consumers to opt out of the municipal

9

aggregation. The process shall include provisions for

10

consumers to return a postcard or similar notice to the

11

municipal aggregator of electricity or its agent. The

12

process may include other opt-out methods, such as

13

telephonic or Internet notice, if these alternative

14

methods allow for verification of a consumer's election

15

to opt out of the municipal aggregation. The time period

<--

16

for a customer to choose to opt out of the municipal

17

aggregation shall be not less than 30 days from the date

18

of the mailing of the written notice. If a consumer's

19

return postcard or notice is postmarked before the opt-

20

out deadline has elapsed, the consumer shall be deemed to

21

have opted out of the municipal aggregation.

22

(xi) (x)  A local or toll-free telephone number, with

<--

23

the available calling hours, that consumers may call with

24

questions regarding the formation or operation of the

25

municipal aggregation.

26

(e)  Opt-in programs; notice and opt-in procedures.--

27

(1)  No consumer may be bound by a contract between a

28

municipal aggregator and an electric generation supplier in

29

opt-in municipal aggregation until the consumer has been

30

provided an opt-in notice required under this subsection and

- 16 -

 


1

the expiration of any waiting period for a consumer to cancel

2

the pending change to the electric generation supplier

3

following written confirmation by the electric distribution

4

company as prescribed by regulation. Customers receiving

<--

5

electric generation service under an opt-in municipal

6

aggregation program may switch to an electric generation

7

supplier other than the supplier to the municipal aggregation

8

program at any time without penalty, cancellation fees or

9

other restrictions, provided that the switch shall take place

10

pursuant to commission-approved switching procedures.

11

(2)  After a municipality executes a contract for

12

electric generation services, but prior to including a

13

consumer's electric account or accounts in an opt-in

14

municipal aggregation, a municipal aggregator of electricity

15

shall provide each eligible consumer with written notice that

16

the customer may participate in the municipal aggregation.

17

The notice, written in plain language, shall include all of

18

the information required under subsection (d)(2)(ii), (iii),

<--

19

(iv), (vi), (vii), (viii), (x) and (xi) (d)(2)(i), (ii),

<--

20

(iii), (v), (vi), (vii), (ix) and (x) and the following

21

information:

22

(i)  A statement informing consumers that if they do

23

not choose to opt in to the municipal aggregation they

24

will be served by the default service offer established

25

under section 2807(e) until the consumer chooses an

26

alternative electric generation supplier or chooses to

27

participate in a subsequent municipal aggregation.

28

(ii)  A description of the process and associated

<--

29

time period for consumers to opt in to the municipal

30

aggregation. The process shall include provisions for

- 17 -

 


1

consumers to return a postcard or similar notice to the

2

municipal aggregator of electricity or its agent. The

3

process may include other opt-in methods, such as

4

telephonic or Internet notice, if these alternative

5

methods allow for verification of a consumer's election

6

to opt in to the municipal aggregation. The time period

7

for a customer to choose to opt in to the municipal

8

aggregation shall be at least 30 days from the date of

9

the mailing of the written notice. If a consumer's return

10

postcard or notice is postmarked before the opt-in

11

deadline has elapsed, the consumer shall be deemed to

12

have opted in to the municipal aggregation.

13

(f)  Additional requirements; provision of customer

14

information.--

15

(1)  The following consumers shall be excluded from

16

enrollment in a municipal aggregation:

17

(i)  For opt-out municipal aggregation only, a

18

consumer that has opted out of the municipal aggregation

19

under subsection (d) or that has a special contract or

20

agreement with an electric distribution company or a

21

consumer under an existing contract with a licensed

22

electric generation supplier other than a consumer under

23

a municipal aggregation contract with the current

24

electric generation supplier of the municipal

25

aggregation.

26

(ii)  A consumer that is not located within the

27

geographic boundaries of the municipal aggregator of

28

electricity.

29

(iii)  A consumer other than a residential or small

30

commercial customer.

- 18 -

 


1

(iv)  A consumer that is enrolled in an electric

2

distribution company's customer assistance program that

3

does not include any electric generation supplier charges

4

in the calculation of the customer assistance program

5

benefit.

6

(v)  End-use consumers served or authorized to be

7

served by an electric cooperative or loads served by a

8

municipality that owns and operates its own electric

9

distribution system.

10

(2)  No earlier than three months and no later than 30

11

days prior to the end of the term of a municipal aggregation

12

contract and commencement of a new municipal aggregation

13

contract or contract renewal term, a municipal aggregator of

14

electricity or the electric generation supplier to the

15

municipal aggregation shall provide notice to all consumers

16

served by the municipal aggregation or who opted out of the

17

municipal aggregation of their right to opt out of the

18

subsequent municipal aggregation and take service pursuant to

19

the default service provider's default service offer or with

20

another electric generation supplier without fee or penalty.

21

The notice shall also explicitly inform customers who may

22

have opted out of any previous municipal aggregation

23

contracts that they may be eligible to participate in the

24

upcoming municipal aggregation contract, pursuant to the

25

eligibility requirements defined in this subsection. The

26

notice shall follow the procedures established for the

27

initial opt-out or opt-in notice set forth in subsection (d)

28

or (e), as applicable, and shall prominently disclose to

29

customers all changes to the terms and conditions associated

30

with the municipal aggregation. The municipal aggregator of

- 19 -

 


1

electricity may not send an opt-out notice to the same

2

customer account for the period covered by the municipal

3

aggregation contract where the customer account has

4

previously opted out.

5

(3)  No municipal aggregator of electricity or electric

6

generation supplier serving a municipal aggregation may

7

impose any term, condition, fee or charge on a consumer

8

served by a municipal aggregation that is materially

9

different from the particular term, condition, fee or charge

10

which was included within the contract between the municipal

11

aggregator of electricity and the electric generation

12

supplier or the notices provided under subsection (d) or (e).

13

(4)  The following shall apply to provisions for the list

14

of eligible municipal aggregation consumers:

15

(i)  After the issuance of a license to a municipal

16

aggregator of electricity and upon request of the

17

municipal aggregator of electricity or an electric

18

generation supplier designated by the municipal

19

aggregator, an electric distribution company shall use

20

reasonable efforts to provide the following information

21

to the extent it is maintained by the electric

22

distribution company for all consumers residing within

23

the municipal aggregator of electricity's geographic

24

boundaries to the municipal aggregator of electricity or

25

the electric generation supplier within 30 calendar days

26

of the request:

27

(A)  An updated list of names, addresses, account

28

numbers, rate codes, indication of whether a consumer

29

is enrolled in a customer assistance program or

30

budget billing, load data and other related consumer

- 20 -

 


1

information, consistent with the information that is

2

provided to other electric generation suppliers.

3

(B)  An identification of consumers who are

4

currently under contract with an electric generation

5

supplier or in a special arrangement with the

6

electric distribution company.

7

(ii)  The municipal aggregator of electricity or the

8

electric generation supplier to the municipal aggregation

9

may only use the consumer information from the list of

10

eligible municipal aggregation consumers for the purpose

11

of forming and operating its municipal aggregation and

12

may not disclose the consumer information unless the

13

release is pursuant to a court order or a commission

14

regulation or order.

15

(iii)  Upon completion of the mailing of opt-out

16

notices and expiration of any associated waiting period

17

under subsection (d)(1), a municipal aggregator of

18

electricity or the electric generation supplier to a

19

municipal aggregation may request updated consumer

20

information required under this subsection, and the

21

electric distribution company shall use reasonable

22

efforts to provide such information within ten days of

23

the request.

24

(5)  The following shall apply to the notice of municipal

25

aggregation and opt-out notice:

26

(i)  Each municipal aggregator of electricity shall

27

ensure that only eligible consumers are included in its

28

municipal aggregation.

29

(ii)  If accounts of ineligible consumers or

30

consumers who have not opted in or who have opted out of

- 21 -

 


1

the municipal aggregation, as applicable, are switched to

2

the electric generation supplier to the municipal

3

aggregation, the municipal aggregator of electricity

4

shall promptly inform the consumer and take all necessary

5

actions to have the consumer switched back to the

6

consumer's original electric generation supplier or

7

default service provider at no cost to the consumer and

8

reimburse the consumer for any amount paid under the

9

municipal aggregation that is greater than the amount

10

otherwise due for its original generation service. The

11

original electric generation supplier or default service

12

provider shall not be liable for any costs, fees,

13

penalties or damages, including any imposed by the

14

regional transmission organization in which the municipal

15

aggregator of electricity is located, arising from the

16

improper transfer. Consistent with due process, the

17

commission may require the electric generation supplier

18

to the municipal aggregator of electricity to pay any

19

such amounts incurred by the original electric generation

20

supplier or default service provider, plus any amounts

21

the original electric generation supplier would have

22

received from the consumer for electric generation

23

service from the time of the improper transfer until the

24

consumer is returned to electric generation service

25

provided by the original electric generation supplier.

26

(g)  Return to default service.--In the event that a

<--

27

(g)  Coordination with default service.--

<--

28

(1)  The implementation of a municipal aggregation

29

program shall be coordinated with the default service supply

30

procurement plans of the electric distribution company whose

- 22 -

 


1

service territory encompasses the boundaries of the

2

municipality participating in the program.

3

(2)  Unless otherwise authorized by the commission, no

4

municipal aggregator may enter into a contract for electric

5

generation services during the term of the default service

6

supply procurement plan, approved by the commission on the

7

effective date of this section, of the electric distribution

8

company whose service territory encompasses the boundaries of

9

the municipal aggregator.

10

(3)  If a municipal aggregator of electricity ceases to

11

provide municipal aggregation services during the current

12

term of the municipal aggregation contract filed with the

13

commission and the customers of the municipal aggregator of

14

electricity are returned to default service, the default

15

service rate for such customers shall be the market price for

16

generation service, including all charges for spot market

17

purchases of energy, capacity, transmission, ancillary

18

services, compliance with the act of November 30, 2004

19

(P.L.1672, No.213), known as the Alternative Energy Portfolio

20

Standards Act, and all other costs incurred by the default

21

service provider in the provision of generation service to

22

such customers, for the remainder of the default service

23

provider's current default service plan.

24

(h)  Duties of electric distribution companies and cost

25

recovery.--

26

(1)  Each electric distribution company shall provide

27

reasonable cooperation with municipal aggregators of

28

electricity or the electric generation supplier to the

29

municipal aggregation to facilitate the proper formation and

30

functioning of opt-out or opt-in municipal aggregation, as

- 23 -

 


1

applicable, including coordinating with municipal aggregators

2

of electricity and electric generation suppliers to promote

3

nondiscriminatory access to electric services and to process

4

enrollment requests from municipal aggregators of electricity

5

or their designated electric generation supplier in

6

accordance with the same processes applicable to other

7

licensed electric generation suppliers providing service to

8

retail electric customers.

9

(2)  An electric distribution company shall recover on a

10

full and current basis all costs incurred to support and that

11

are related to municipal aggregation through a nonbypassable

12

reconcilable automatic adjustment charge under section 1307

13

(relating to sliding scale of rates; adjustments) from all

14

residential and small commercial consumers accessing the

15

electric distribution company's transmission and distribution

16

system.

17

(i)  Duties of commission.--The commission shall promulgate  

<--

18

shall:

<--

19

(1)  Promulgate regulations necessary to implement the

20

provisions of this section, including, but not limited to,

21

developing opt-in and opt-out notices for use by municipal

<--

22

aggregators of electricity in this Commonwealth.

23

(2)  Promulgate regulations and take any other action

<--

24

necessary to coordinate the implementation of municipal

25

aggregation programs with commission approval of electric

26

distribution company default supply procurement plans.

27

Section 4.  Sections 2807(d)(1) and 2809(a) of Title 66 are

28

amended to read:

29

§ 2807.  Duties of electric distribution companies.

30

* * *

- 24 -

 


1

(d)  Consumer protections and customer service.--The electric

2

distribution company shall continue to provide customer service

3

functions consistent with the regulations of the commission,

4

including meter reading, complaint resolution and collections.

5

Customer services shall, at a minimum, be maintained at the same

6

level of quality under retail competition.

7

(1)  [The] Except as provided under section 2806.3

8

(relating to municipal aggregation of electric generation

9

supply), the commission shall establish regulations to ensure

10

that an electric distribution company does not change a

11

customer's electricity supplier without direct oral

12

confirmation from the customer of record or written evidence

13

of the customer's consent to a change of supplier.

14

* * *

15

§ 2809.  Requirements for electric generation suppliers.

16

(a)  License requirement.--No person or corporation,

17

including municipal corporations which choose to provide service

18

outside their municipal limits except to the extent provided

19

prior to the effective date of this chapter, brokers and

20

marketers, aggregators, municipal aggregators of electricity

21

implementing municipal aggregation programs and other entities,

22

shall engage in the business of an electric generation supplier

23

in this Commonwealth unless the person or corporation holds a

24

license issued by the commission. The commission may waive

25

certain licensing requirements in its regulations for municipal

26

aggregators of electricity implementing municipal aggregation

27

programs. Consistent with 15 Pa.C.S. Ch. 74 (relating to

28

generation choice for customers of electric cooperatives),

29

electric cooperative corporations must possess a certificate for

30

service to supply generation services beyond their territorial

- 25 -

 


1

limits.

2

* * *

3

Section 5.  This act shall take effect in 60 days.