PRINTER'S NO. 178
No. 185 Session of 1997
INTRODUCED BY CORMAN AND STOUT, JANUARY 23, 1997
REFERRED TO TRANSPORTATION, JANUARY 23, 1997
AN ACT 1 Providing for the highway capital budget for the fiscal year 2 1997-1998. 3 The General Assembly of the Commonwealth of Pennsylvania 4 hereby enacts as follows: 5 CHAPTER 1 6 GENERAL PROVISIONS 7 Section 101. Short title. 8 This act shall be known and may be cited as the Highway 9 Capital Budget Act of 1997-1998. 10 Section 102. Total authorization. 11 The total authorization for the capital projects itemized in 12 this act and to be constructed by the Department of 13 Transportation, its successors or assigns and to be financed 14 from current revenues of the Motor License Fund shall be 15 $2,614,996,000. 16 Section 103. Itemization of public highway projects. 17 Additional capital projects in the category of public highway
1 projects to be constructed by the Department of Transportation, 2 its successors or assigns and to be financed from current 3 revenues of the Motor License Fund are itemized in Chapter 3, 4 together with their respective estimated financial costs. 5 CHAPTER 3 6 ITEMIZED PROJECTS 7 Total 8 Project 9 Project Allocation 10 Section 301. Adams County (Reserved). 11 Section 302. Allegheny County. 12 (a) I-276 13 (1) Milepost 6 North to I-79, Pavement 14 Rehabilitation and Safety Improvements 1,300,000 15 (Base Project Allocation - $1,163,000) 16 (Land Allocation - $7,000) 17 (Design and Contingencies - $130,000) 18 (b) I-376 19 (1) PA 130 to I-76, Pavement 20 Rehabilitation and Safety Improvements 500,000 21 (Base Project Allocation - $447,000) 22 (Land Allocation - $3,000) 23 (Design and Contingencies - $50,000) 24 (2) I-376 Access Ramp, Construction of an 25 Off-Ramp from Parkway East to 26 Pittsburgh Technology Center Site 12,000,000 27 (c) PA 19 28 (1) Gilkeson Road to Cochran Road, 29 Pavement Rehabilitation and Safety 30 Improvements 450,000 19970S0185B0178 - 2 -
1 (Base Project Allocation - $450,000) 2 (d) Fort Duquesne Boulevard 3 (1) Realignment of Fort Duquesne 4 Boulevard 8,400,000 5 (e) Liberty Avenue 6 (1) Reconstruction of Liberty Avenue 6,600,000 7 (f) North Shore Drive 8 (1) Relocation of North Shore Drive to the 9 North Side of Three Rivers Stadium Site 10 in Order to Open Access to the 11 Riverfront 8,100,000 12 (g) I-79 13 (1) Completion of the Interchange at I-79 14 and SR 0060 to Permit Easier Access to 15 Airport 10,000,000 16 (2) Design and construction of an 17 Interchange at I-79 and Parkway West to 18 Permit Easier Access to and from the 19 Airport and I-79 17,125,000 20 (Base Project Allocation - $15,000,000) 21 (Design and Contingencies - $2,125,000) 22 (3) Construct Missing Link Between I-79 23 and Parkway West 16,000,000 24 (h) US 22/30 25 (1) Reconstruction of US 22/30 Between 26 Imperial Exit and McDonald Exit 15,000,000 27 (i) SR 0028 28 (1) Widen SR 0028 Between Downtown and 29 40th Street Bridge 30,000,000 30 (2) Installation of Noise Barriers on both 19970S0185B0178 - 3 -
1 sides of SR 0028 from Highland Park 2 Bridge to Lexington Avenue in Aspinwall 3 Borough 5,000,000 4 (j) SR 0051 5 (1) Reconstruction of Intersection of SR 6 0051 and SR 0088 14,518,000 7 (k) Smithfield Street 8 (1) Reconstruction of the Smithfield 9 Street Bridge to Support Retail 10 Activity 18,000,000 11 (l) Wood Street 12 (1) Reconstruction of Wood Street to 13 Support Retail Activities 27,000,000 14 (m) Fifth and Forbes Reconstruction 15 (1) Reconstruction to Fifth and Forbes 16 Avenue Corridor to Promote Retail 17 Development 12,000,000 18 (n) Golden Triangle Intermodal Facility/LRT 19 Station 20 (1) Development of a New Intermodal 21 Facility and Transit Stop to Serve the 22 Retail Centers in Downtown 13,000,000 23 (o) North Side Intermodal Facility 24 (1) Development of a Major Commuter 25 Interceptor Intermodal Facility and 26 Transit Station on the North Side 34,420,000 27 (p) Findlay Connector 28 (1) Construction of Highway Connection 29 Between Pittsburgh International 30 Airport and Route 22 West in Order to 19970S0185B0178 - 4 -
1 Assist the Development of the Airport 2 Technology Center 100,000,000 3 (q) Cargo Interchange 4 (1) Development of State-of-the-Art Cargo 5 Interchange Facility at the Cargo 6 Terminal of the Greater Pittsburgh 7 International Airport to Support 8 Regional Business Growth in Global 9 Markets 16,000,000 10 (r) Lawrenceville Industrial Access Road 11 (1) Construction of a Highway Bypass to 12 Permit Truck and Passenger Cars Easier 13 Access into and through the 14 Lawrenceville Industrial and Commercial 15 Areas 46,800,000 16 (s) Mon-Fayette Expressway 17 (1) Construction of the Mon-Fayette 18 Expressway from Pittsburgh to Route 51 675,000,000 19 (t) Multi-Modal Corridor 20 (1) Transportation System Connecting 21 Downtown Pittsburgh with the Greater 22 Pittsburgh International Airport 363,750,000 23 (u) Tech World/Airport Transit Connection 24 (1) Creation of a Transit Connection 25 Between the Airport Technology Center 26 and the Greater Pittsburgh 27 International Airport 135,000,000 28 (v) Settlers Cabin Interchange 29 (1) Construction of a New Interchange 30 Along Parkway West in Robinson 19970S0185B0178 - 5 -
1 Township 10,750,000 2 (w) South Portal of Liberty Tubes 3 (1) Construction of a New Free-Flowing 4 Intersection to Accommodate Traffic 5 Flow 23,450,000 6 (x) Ewing Interchange 7 (1) Construction of a New Interchange 8 Along Parkway West in Moon Township 9 Adjacent to the Pittsburgh 10 International Airport 16,350,000 11 (y) West End Circle 12 (1) Purchase of a Portion of West End 13 Branch of Wheeling and Lake Erie 14 Railway Right-of-Way to Accommodate 15 West End Circle Project of PennDOT and 16 Reconstruct Railroad Interchange with 17 CSXT via the Pittsburgh Industrial 18 Railroad South of Bridgeville between 19 Milepost 57 and Milepost 61 12,800,000 20 (Land Allocation - $12,500,000) 21 (Design and Contingencies - $300,000) 22 (z) Pittsburgh Transportation Corridor 23 (1) Purchase Wheeling and Lake Erie 24 Railway Main Right-of-Way from Rook 25 Yard (Milepost 56 to Longview Milepost 26 46) to Create Two New Transportation 27 Corridors to Downtown Pittsburgh 18,400,000 28 (Land Allocation - $18,000,000) 29 (Design and Contingencies - $400,000) 30 (aa) Pittsburgh Technology Center 19970S0185B0178 - 6 -
1 (1) Construction of an Access Road between 2 Pittsburgh Technology Center and South 3 Side of LTV Site 5,000,000 4 (bb) SR 3009 5 (1) Improvement of Intersection of SR 6 3009, Baptist Road, and SR 2040, 7 Broughton Road, Bethel Park 1,200,000 8 (Base Project Allocation - $1,000,000) 9 (Land Allocation - $100,000) 10 (Design and Contingencies - $100,000) 11 Section 303. Armstrong County (Reserved). 12 Section 304. Beaver County. 13 (a) SR 51 14 (1) Reconstruct and rehabilitate SR 51, 15 including hillside in City of 16 Aliquippa 25,000,000 17 (Base Project Allocation 18 - $25,000,000) 19 Section 305. Bedford County. 20 (a) PA 56 21 (1) PA 56 Extension, Bedford Township 22 Access Road and Related Improvements 325,000 23 (Base Project Allocation - $250,000) 24 (Land Allocation - $50,000) 25 (Design and Contingencies - $25,000) 26 (b) I-99 27 (1) Bedford Borough Line North to Blair 28 County Line, Roadway Rehabilitation and 29 Safety Improvements 1,440,000 30 (Base Project Allocation - $1,320,000) 19970S0185B0178 - 7 -
1 (Land Allocation - $60,000) 2 (Design and Contingencies - $60,000) 3 (c) Construction of Wetlands 4 (1) Construction of Numerous Five-Acre to 5 Ten-Acre Wetland Projects to Be Used 6 for Future Mitigation Purposes for 7 Highway Construction in Bedford, Blair, 8 Cambria, Fulton, Huntingdon and 9 Somerset Counties 500,000 10 (Base Project Allocation - $300,000) 11 (Land Allocation - $50,000) 12 (Design and Contingencies - $150,000) 13 Section 306. Berks County. 14 (a) I-78 15 (1) Lebanon County Line to East of 16 Frystown, Rehabilitation and Safety 17 Improvements 8,780,000 18 (Base Project Allocation - $8,500,000) 19 (Land Allocation - $100,000) 20 (Design and Contingencies - $180,000) 21 (2) Hamburg to Lehigh County, Pavement, 22 Bridge Rehabilitation and Safety 23 Improvements 26,127,000 24 (Base Project Allocation - $25,477,000) 25 (Design and Contingencies - $650,000) 26 (b) SR 0183 27 (1) Interchange with SR 0222, Widen Bridge 28 and Reconstruct Interchange 14,500,000 29 (Base Project Allocation - $7,400,000) 30 (Land Allocation - $4,600,000) 19970S0185B0178 - 8 -
1 (Design and Contingencies - $2,500,000) 2 (2) Intersection with SR 3055, Widen 3 Bridge and Reconstruct Interchange 5,000,000 4 (Base Project Allocation - $3,500,000) 5 (Land Allocation - $750,000) 6 (Design and Contingencies - $750,000) 7 (c) US 222 8 (1) Reconstruct US 222 as a Four-Lane 9 Limited Access Highway Between SR 3028 10 (Warren Street Extension) in Cumru 11 Township and the Existing US 222 12 Expressway in Lancaster County 90,200,000 13 (Base Project Allocation - $66,000,000) 14 (Land Allocation - $17,200,000) 15 (Design and Contingencies - $7,000,000) 16 (2) Intersection with SR 0073, 17 Intersection Improvements 903,000 18 (Base Project Allocation - $628,000) 19 (Land Allocation - $175,000) 20 (Design and Contingencies - $100,000) 21 (3) Intersection with SR 0662, 22 Intersection Improvements 551,000 23 (Base Project Allocation - $445,000) 24 (Land Allocation - $51,000) 25 (Design and Contingencies - $55,000) 26 (d) SR 0061 27 (1) SR 3055 to Schuylkill County Line, Add 28 Lanes, Resurface and Shoulder 29 Construction 20,000,000 30 (2) SR 3055 to US 222, Widen Highway, 19970S0185B0178 - 9 -
1 Abolish Existing Railroad Overpass and 2 Construct New Overpass 20,000,000 3 (e) SR 2033 4 (1) Shelbourne Road TR 422 and TR 562, 5 Realignment 6,525,000 6 (Base Project Allocation - $5,375,000) 7 (Land Allocation - $400,000) 8 (Design and Contingencies - $750,000) 9 (f) SR 3055 10 (1) Outer Bypass Rehabilitation, SR 0061 11 to the End of Expressway, 12 Rehabilitation 4,400,000 13 (Base Project Allocation - $2,400,000) 14 (Land Allocation - $1,000,000) 15 (Design and Contingencies - $1,000,000) 16 (g) SR 0737 17 (1) Widen and Reconstruct Between SR 0222 18 and I-78 3,000,000 19 (h) Warren Street Extension 20 (1) Construct a New Four-Lane Limited 21 Access Highway Connecting US 422 in the 22 Borough of Wyomissing to US 222 in 23 Cumru Township. The Proposed Highway 24 would have Interchanges with US 422, PA 25 724 and US 222 72,500,000 26 (Base Project Allocation - $45,500,000) 27 (Land Allocation - $18,800,000) 28 (Design and Contingencies - $8,200,000) 29 Section 307. Blair County. 30 (a) I-99 19970S0185B0178 - 10 -
1 (1) Bedford County Line North to the 2 Village of Bald Eagle, Roadway 3 Rehabilitation and Safety Improvements 1,440,000 4 (Base Project Allocation - $1,320,000) 5 (Land Allocation - $60,000) 6 (Design and Contingencies - $60,000) 7 (2) Construction of New Interchange with 8 US 220 at Kettle Street to Juniata Gap 9 Road at Chestnut Avenue 90,000,000 10 (Base Project Allocation - $79,000,000) 11 (Land Allocation - $1,000,000) 12 (Design and Contingencies - 13 $10,000,000) 14 (b) SR 4027 15 (1) Reconstruction and/or Relocation in 16 Tyrone Borough and Snyder Township 3,200,000 17 (Base Project Allocation - $2,500,000) 18 (Land Allocation - $200,000) 19 (Design and Contingencies - $500,000) 20 (c) SR 4008 21 (1) Reconstruction of Horseshoe Curve Road 22 from 40th Street and Board Avenue to US 23 22 at Gallitzin Interchange in Cambria 24 County 4,901,000 25 (Base Project Allocation - $4,198,000) 26 (Land Allocation - $350,000) 27 (Design and Contingencies - $353,000) 28 (d) Chestnut Avenue Extension 29 (1) Complete Construction of Chestnut 30 Avenue Extension 27,000,000 19970S0185B0178 - 11 -
1 (Base Project Allocation - $17,000,000) 2 (Land Allocation - $5,000,000) 3 (Design and Contingencies - $5,000,000) 4 Section 308. Bradford County. 5 (a) SR 14 6 (1) Canton Township, Intersection of PA 14 7 and SR 3012, Village of Grover, 0.5 8 Mile Reconstruction, Improve Horizontal 9 Alignment and Intersection 2,100,000 10 (Base Project Allocation - $1,800,000) 11 (Land Allocation - $100,000) 12 (Design and Contingencies - $200,000) 13 Section 309. Bucks County. 14 (a) I-95 15 (1) Philadelphia County to New Jersey 16 State Line, Pavement Rehabilitation and 17 Safety Improvements 1,900,000 18 (Base Project Allocation - $1,700,000) 19 (Land Allocation - $10,000) 20 (Design and Contingencies - $190,000) 21 (b) SR 309 22 (1) County Line Road, Hilltown Township to 23 Bethlehem Road, West Rockhill Township, 24 Pavement Rehabilitation, Shoulders and 25 Safety Improvements 2,000,000 26 (Base Project Allocation - $1,500,000) 27 (Land Allocation - $150,000) 28 (Design and Contingencies - $350,000) 29 (c) SR 313 30 (1) New Galena Road, New Britain Township 19970S0185B0178 - 12 -
1 to Stump Road, New Britain Township, 2 Install Truck Climbing Lane in 3 Westbound Direction 750,000 4 (Base Project Allocation - $500,000) 5 (Land Allocation - $150,000) 6 (Design and Contingencies - $100,000) 7 (d) SR 332 8 (1) Newtown and Lower Makefield Townships, 9 at Lindenhurst Road, SR 2069, Widening, 10 Intersection Improvements and Highway 11 Restoration 1,000,000 12 (Base Project Allocation - $1,000,000) 13 Section 310. Butler County. 14 (a) US 422 15 (1) Intersection Improvements and 16 Installation of New Traffic Signals at 17 Intersection of US 422, SR 0038 and SR 18 0068 8,000,000 19 (2) Restoration of US 422 in Muddycreek 20 and Franklin Townships 10,100,000 21 (Base Project Allocation - $10,000,000) 22 (Design and Contingencies - $100,000) 23 (b) Hansen Avenue 24 (1) Installation of New Traffic Signals at 25 Hansen Avenue in Butler Township 160,000 26 (c) SR 0068 27 (1) Installation of Traffic Signals at 28 Intersection with Whitestown Road 50,000 29 (2) Installation of Traffic Signals at 30 Intersection with Stevenson Road 50,000 19970S0185B0178 - 13 -
1 (d) SR 0356 2 (1) Widen SR 0356 from Silverville Road to 3 Riemer Road 5,000,000 4 (e) SR 0228 5 (1) Installation of Traffic Signals at 6 Intersection with South Pike Road 200,000 7 (2) Restoration, Reconstruction and 8 Widening of SR 228 from SR 3015 to SR 8 9 South 9,700,000 10 (Base Project Allocation - $8,000,000) 11 (Land Allocation - $1,000,000) 12 (Design and Contingencies - $700,000) 13 (3) Restoration, Reconstruction and 14 Widening of SR 228 from SR 8 South to 15 SR 356 21,500,000 16 (Base Project Allocation - $18,000,000) 17 (Land Allocation - $2,000,000) 18 (Design and Contingencies - $1,500,000) 19 (f) South Pike Road 20 (1) Installation of Traffic Signals at 21 Intersection with Monroe Road 200,000 22 (g) SR 528 23 (1) Reconstruction of Existing Interchange 24 in Jackson Township 1,900,000 25 (Base Project Allocation - $1,400,000) 26 (Land Allocation - $200,000) 27 (Design and Contingencies - $300,000) 28 (h) SR 3025 29 (1) Reconstruction of Existing Interchange 30 in Jackson Township 4,100,000 19970S0185B0178 - 14 -
1 (Base Project Allocation - $3,500,000) 2 (Land Allocation - $300,000) 3 (Design and Contingencies - $300,000) 4 (i) SR 8 5 (1) Restoration and Reconstruction of SR 8 6 South in City of Butler and Butler, 7 Penn and Middlesex Townships 16,700,000 8 (Base Project Allocation - $15,000,000) 9 (Land Allocation - $1,000,000) 10 (Design and Contingencies - $700,000) 11 Section 311. Cambria County. 12 (a) US 219 13 (1) Scalp Avenue to Davidsville, Pavement 14 Restoration 1,392,000 15 (Base Project Allocation - $1,312,000) 16 (Design and Contingencies - $80,000) 17 (b) SR 4021 18 (1) Construct Access Road from SR 4021 to 19 Hastings Area Industrial Park 1,300,000 20 Section 312. Cameron County (Reserved). 21 Section 313. Carbon County. 22 (a) I-80 23 (1) Harmony Lake to Monroe County, 24 Pavement Rehabilitation and Safety 25 Improvements 200,000 26 (Base Project Allocation - $179,000) 27 (Land Allocation - $1,000) 28 (Design and Contingencies - $20,000) 29 Section 314. Centre County. 30 (a) I-80 19970S0185B0178 - 15 -
1 (1) Clearfield County Line to Clinton 2 County, Pavement Rehabilitation and 3 Safety Improvements 3,300,000 4 (Base Project Allocation - $2,953,000) 5 (Land Allocation - $17,000) 6 (Design and Contingencies - $330,000) 7 (2) Marion Township, Exit 24, Interchange 8 Reconstruction 1,560,000 9 (Base Project Allocation - $1,500,000) 10 (Design and Contingencies - $60,000) 11 (3) Boggs Township, Exit 23, Interchange 12 Reconstruction 1,160,000 13 (Base Project Allocation - $1,100,000) 14 (Design and Contingencies - $60,000) 15 (b) PA 504 16 (1) Phillipsburg Borough and Rush 17 Township, Cold Stream Run Bridge to 18 Airport, Two-Lane Reconstruction 400,000 19 (Base Project Allocation - $240,000) 20 (Land Allocation - $60,000) 21 (Design and Contingencies - $100,000) 22 (c) PA 350 23 (1) Climbing Lane and Two-Lane Relocation, 24 North of Bald Eagle to Top of Sandy 25 Ridge Mountain 5,750,000 26 (Base Project Allocation - $5,200,000) 27 (Land Allocation - $150,000) 28 (Design and Contingencies - $400,000) 29 Section 315. Chester County. 30 (a) SR 41 19970S0185B0178 - 16 -
1 (1) Relocation of SR 41 in Southern 2 Chester County 10,000,000 3 (Design and Contingencies - 4 $10,000,000) 5 (2) Upgrade Intersection of SR 41 and SR 6 796 in Londonderry Township 665,000 7 (Base Project Allocation - $600,000) 8 (Land Allocation - $15,000) 9 (Design and Contingencies - $50,000) 10 (3) Upgrade Intersection of SR 41 and Zook 11 Road in West Sadsbury Township 665,000 12 (Base Project Allocation - $600,000) 13 (Land Allocation - $15,000) 14 (Design and Contingencies - $50,000) 15 (b) US 1 16 (1) East Marlborough Township, 17 Transportation Partnership Overpass 3,000,000 18 (Base Project Allocation - $2,500,000) 19 (Land Allocation - $200,000) 20 (Design and Contingencies - $300,000) 21 (c) SR 926 22 (1) Resurface, Widen, Install New Drainage 23 and Improve Intersection Visibility 24 from Route 352 to Route 202 675,000 25 (Base Project Allocation - $325,000) 26 (Land Allocation - $125,000) 27 (Design and Contingencies - $225,000) 28 (d) US 202 29 (1) Signalization of Southbound US 202 30 Off-Ramp at Intersection with Paoli 19970S0185B0178 - 17 -
1 Pike, West Goshen Township 335,000 2 (Base Project Allocation - $250,000) 3 (Design and Contingencies - $85,000) 4 (2) Engineering study of the capacity and 5 potential safety improvements to the 6 ramps, structures and roadway of US 202 7 between US 30 and Swedesford Road 8 interchange in East Whiteland 1,500,000 9 (Design and Contingencies - $1,500,000) 10 (e) Paoli Pike 11 (1) Install New Storm Water Drainage 12 System at Two Locations on Paoli Pike 13 in Willistown Township 482,000 14 (Base Project Allocation - $450,000) 15 (Design and Contingencies - $32,000) 16 Section 316. Clarion County (Reserved). 17 Section 317. Clearfield County. 18 (a) I-80 19 (1) Jefferson County Line to Centre County 20 Line, Pavement Rehabilitation and 21 Safety Improvements 4,100,000 22 (Base Project Allocation - $3,670,000) 23 (Land Allocation - $20,000) 24 (Design and Contingencies - $410,000) 25 (b) US 219 26 (1) SR 219 and SR 4019, South of Dubois, 27 Add Two-Way Left Turn Lane 188,000 28 (Base Project Allocation - $138,000) 29 (Land Allocation - $30,000) 30 (Design and Contingencies - $20,000) 19970S0185B0178 - 18 -
1 Section 318. Clinton County. 2 (a) I-80 3 (1) Centre County Line to Union County 4 Line, Pavement Rehabilitation and 5 Safety Improvements 2,400,000 6 (Base Project Allocation - $2,148,000) 7 (Land Allocation - $12,000) 8 (Design and Contingencies - $240,000) 9 Section 319. Columbia County. 10 (a) PA 54 11 (1) PA 54/61 and PA 42, Village of 12 Centralia, Restoration 150,000 13 (Base Project Allocation - $120,000) 14 (Land Allocation - $6,000) 15 (Design and Contingencies - $24,000) 16 (b) PA 487 17 (1) Knoebels Access Road, Franklin 18 Township, Intersection and Access 19 Improvements 300,000 20 (Base Project Allocation - $180,000) 21 (Land Allocation - $20,000) 22 (Design and Contingencies - $100,000) 23 Section 320. Crawford County. 24 (a) I-79 25 (1) Northbound and Southbound Rest Areas 26 (Sites 19 and 20), Sewage Treatment 27 Plant Improvements, Length 0.5 Mile 1,150,000 28 (Base Project Allocation - $1,000,000) 29 (Design and Contingencies - $150,000) 30 (b) SR 8 19970S0185B0178 - 19 -
1 (1) Intersection Improvements at SR 8 and 2 SR 27 to Provide Additional Truck 3 Turning Radii 205,000 4 (Base Project Allocation - $160,000) 5 (Land Allocation - $10,000) 6 (Design and Contingencies - $35,000) 7 (c) SR 27 8 (1) Install New Signals at Intersections 9 within City of Meadville 275,000 10 (Base Project Allocation - $225,000) 11 (Land Allocation - $20,000) 12 (Design and Contingencies - $30,000) 13 (2) Various Corridor and Spot Improvements 14 on SR 27 between Meadville and 15 Titusville 7,000,000 16 (Base Construction Allocation - 17 $6,000,000) 18 (Land Allocation - $400,000) 19 (Design and Contingencies - $600,000) 20 (d) SR 77 21 (1) Various Corridor and Spot Improvements 22 on SR 77, SR 408 and SR 1010 between 23 Meadville and Titusville 7,000,000 24 (Base Construction Allocation - $ 25 6,000,000) 26 (Land Allocation - $400,000) 27 (Design and Contingencies - $600,000) 28 Section 321. Cumberland County. 29 (a) I-81 30 (1) Exit 12, Interchange with PA 465, 19970S0185B0178 - 20 -
1 Interchange Improvements 1,520,000 2 (Base Construction Allocation - 3 $1,200,000) 4 (Land Allocation - $20,000) 5 (Design and Contingencies - $300,000) 6 Section 322. Dauphin County. 7 (a) I-283 8 (1) PA 441 to I-76, Pavement 9 Rehabilitation and Safety Improvements 200,000 10 (Base Project Allocation - $179,000) 11 (Land Allocation - $1,000) 12 (Design and Contingencies - $20,000) 13 (b) PA 283 14 (1) I-283 to PA 341, Pavement 15 Rehabilitation and Safety Improvements 6,962,000 16 (Base Project Allocation - $6,500,000) 17 (Land Allocation - $2,000) 18 (Design and Contingencies - $460,000) 19 (c) US 22 20 (1) Construction of Pedestrian Tunnel or 21 Overhead Crossing of US 22 near Manor 22 Drive in West Hanover Township 3,250,000 23 (Base Project Allocation - $3,000,000) 24 (Land Allocation - $100,000) 25 (Design and Contingencies - $150,000) 26 (d) Pleasant View Road 27 (1) Install New Signals and Reconstruct 28 Highway-Railroad Grade Crossing on 29 Pleasant View Road, South Hanover 30 Township 190,000 19970S0185B0178 - 21 -
1 (Base Project Allocation - $150,000) 2 (Land Allocation - $20,000) 3 (Design and Contingencies - $20,000) 4 (e) I-81 5 (1) Installation of sound barriers on 6 north and south sides of I-81 from 7 intersection with I-83 to Mountain Road 8 Interchange 5,300,000 9 (Base Project Allocation - $5,000,000) 10 (Design and Contingencies - $300,000) 11 Section 323. Delaware County. 12 (a) US 30 13 (1) Ithan Avenue, Villanova University, 14 Pedestrian Tunnel and Turn Lanes 600,000 15 (Base Project Allocation - $600,000) 16 (b) I-95 17 (1) Install Sound Barriers on I-95 on East 18 Side from SR 420 to SR 291 2,100,000 19 (Base Project Allocation - $2,000,000) 20 (Design and Contingencies - $100,000) 21 Section 324. Elk County. 22 (a) Osterhout Street 23 (1) From SR 120 Intersection to SR 219 24 Intersection, Reconstruct to 24 Feet 3,585,000 25 (Base Project Allocation - $2,500,000) 26 (Land Allocation - $600,000) 27 (Design and Contingencies - $485,000) 28 (b) Elk County Industrial Park Access Road 29 (1) SR 120, SR 255, SR 1001, SR 1002, SR 30 1003 and SR 1008, Reconstruct to 24 19970S0185B0178 - 22 -
1 Feet 2,882,000 2 (Base Project Allocation - $2,632,000) 3 (Land Allocation - $100,000) 4 (Design and Contingencies - $150,000) 5 (c) US 219 6 (1) Relocation of Allegheny & Eastern 7 Track to Allow for the Construction of 8 a US 219 Bypass of Johnsonburg 5,100,000 9 (Base Construction Allocation - 10 $3,900,000) 11 (Land Allocation - $1,000,000) 12 (Design and Contingencies - $200,000) 13 Section 325. Erie County. 14 (a) SR 4024 15 (1) SR 4024 Extension, US 19 to Bush 16 Industrial Road, Summit Township, 17 Construct New Roadway and Intersection 18 Improvements 620,000 19 (Base Project Allocation - $400,000) 20 (Land Allocation - $120,000) 21 (Design and Contingencies - $100,000) 22 (b) I-79 23 (1) Crawford County Line to I-90 in Erie 24 County, Pavement Rehabilitation and 25 Safety Improvements 1,900,000 26 (Base Project Allocation - $1,700,000) 27 (Land Allocation - $10,000) 28 (Design and Contingencies - $190,000) 29 (c) SR 3006 30 (1) From Bridge to Erie Street, Borough of 19970S0185B0178 - 23 -
1 Edinboro, Add Turn Lanes 64,000 2 (Base Project Allocation - $44,000) 3 (Land Allocation - $10,000) 4 (Design and Contingencies - $10,000) 5 Section 326. Fayette County. 6 (a) SR 21 7 (1) SR 21 from Uniontown to Masontown, 8 Safety Improvements 2,000,000 9 (Design and Contingencies - $2,000,000) 10 (b) SR 711 11 (1) SR 711 in Connellsville, Safety 12 Improvements 400,000 13 (Design and Contingencies - $400,000) 14 Section 327. Forest County. 15 (a) SR 666 16 (1) Beaver Run Bridge to Whig Hill 17 Highway, Restoration 980,000 18 (Base Project Allocation - $800,000) 19 (Land Allocation - $30,000) 20 (Design and Contingencies - $150,000) 21 (2) Whig Hill to Little Minister Run 22 Bridge, Restoration 1,380,000 23 (Base Project Allocation - $1,200,000) 24 (Land Allocation - $30,000) 25 (Design and Contingencies - $150,000) 26 (3) East of Upper Sheriff Creek to West of 27 Porcupine Run Bridge, Restoration 2,230,000 28 (Base Project Allocation - $2,000,000) 29 (Land Allocation - $30,000) 30 (Design and Contingencies - $200,000) 19970S0185B0178 - 24 -
1 (4) West of Porcupine Run Bridge to Bobbs 2 Creek Bridge, Restoration 1,530,000 3 (Base Project Allocation - $1,300,000) 4 (Land Allocation - $30,000) 5 (Design and Contingencies - $200,000) 6 (5) Bobbs Creek Bridge to Little Minister 7 Run Bridge, Restoration 1,230,000 8 (Base Project Allocation - $1,000,000) 9 (Land Allocation - $30,000) 10 (Design and Contingencies - $200,000) 11 (6) Village of Lynch to Village of Whig 12 Hill, Howe and Kingsley Townships, 13 Reconstruction 16,500,000 14 (Base Project Allocation - $14,000,000) 15 (Land Allocation - $1,000,000) 16 (Design and Contingencies - $1,500,000) 17 Section 328. Franklin County (Reserved). 18 Section 329. Fulton County. 19 (a) I-70 20 (1) Warfordsburg to Deneen Gap, 21 Rehabilitation and Safety Improvements 637,000 22 (Base Project Allocation - $607,000) 23 (Design and Contingencies - $30,000) 24 Section 330. Greene County (Reserved). 25 Section 331. Huntingdon County. 26 (a) SR 26 27 (1) Huntingdon Borough and Oneida, Miller, 28 Jackson and Barree Townships, Isolated 29 Improvements along 22 Miles of SR 26, 30 Including Reconstruction and Widening 19970S0185B0178 - 25 -
1 of Pavement, Realignment, Intersection 2 Improvements and Truck Climbing Lanes, 3 to Upgrade Highway to Current 4 Standards 25,500,000 5 (Base Project Allocation - $20,500,000) 6 (Land Allocation - $2,000,000) 7 (Design and Contingencies - $3,000,000) 8 (2) Reconstruction and Corridor 9 Improvements from Huntingdon Borough to 10 Centre County Line 25,000,000 11 (Base Project Allocation - $20,500,000) 12 (Land Allocation - $2,000,000) 13 (Design and Contingencies - $2,500,000) 14 (b) SR 944 15 (1) Engineering and Land Acquisition from 16 Intersection of SR 944 to Village of 17 Cooks 600,000 18 (Land Allocation - $100,000) 19 (Design and Contingencies - $500,000) 20 Section 332. Indiana County (Reserved). 21 Section 333. Jefferson County. 22 (a) I-80 23 (1) Milepost 91 to Clearfield County Line, 24 Pavement Rehabilitation and Safety 25 Improvements 500,000 26 (Base Project Allocation - $447,000) 27 (Land Allocation - $3,000) 28 (Design and Contingencies - $50,000) 29 (2) Exit 15, Railroad Overpass to 30 Westbound Roadside Rest, Interstate 19970S0185B0178 - 26 -
1 Preventative Maintenance 3,580,000 2 (Base Project Allocation - $3,500,000) 3 (Design and Contingencies - $80,000) 4 Section 334. Juniata County (Reserved). 5 Section 335. Lackawanna County. 6 (a) I-81 7 (1) Various routes in Lackawanna and 8 Luzerne Counties, in the Vicinity of 9 Scranton and Wilkes-Barre, Intelligent 10 Transportation Systems Study 80,000 11 (Design and Contingencies - $80,000) 12 (2) Luzerne County Line to Susquehanna 13 County Line, Pavement Rehabilitation 14 and Safety Improvements 2,700,000 15 (Base Project Allocation - $2,416,000) 16 (Land Allocation - $14,000) 17 (Design and Contingencies - $270,000) 18 (3) Reconstruction of I-81 and Davis 19 Street Interchange to Increase Length 20 of Entrance and Exit Ramps 5,000,000 21 (Base Project Allocation - $4,600,000) 22 (Land Allocation - $300,000) 23 (Design and Contingencies - $100,000) 24 (b) I-84 25 (1) I-81 to Wayne County Line, Pavement 26 Rehabilitation and Safety Improvements 1,200,000 27 (Base Project Allocation - $1,074,000) 28 (Land Allocation - $6,000) 29 (Design and Contingencies - $120,000) 30 (c) I-380 19970S0185B0178 - 27 -
1 (1) I-84 to Monroe County Line, Pavement 2 Rehabilitation and Safety Improvements 1,000,000 3 (Base Project Allocation - $895,000) 4 (Land Allocation - $5,000) 5 (Design and Contingencies - $100,000) 6 (d) US 6 and US 11 7 (1) Construction of Clarks Summit Bypass 25,000,000 8 (Base Project Allocation - $24,000,000) 9 (Design and Contingencies - 1,000,000) 10 (2) Construction of Turning Lanes in South 11 Abington Township 1,100,000 12 (Base Project Allocation - $1,000,000) 13 (Design and Contingencies - $100,000) 14 (e) SR 632 15 (1) Reconstruction and Drainage 16 Improvements, South Abington Township 350,000 17 (Base Project Allocation - $300,000) 18 (Design and Contingencies - $50,000) 19 (f) Shady Lane Road 20 (1) Widen Railroad Tunnel 2,000,000 21 (Base Project Allocation - $1,800,000) 22 (Design and Contingencies - $200,000) 23 (g) Keyser - Milwaukee Road 24 (1) Reconstruction of Road from Main 25 Street to Oak Street 250,000 26 (Base Project Allocation - $225,000) 27 (Design and Contingencies - $25,000) 28 Section 336. Lancaster County. 29 (a) PA 23 30 (1) US 30 to Berks County Line, Pavement 19970S0185B0178 - 28 -
1 Rehabilitation and Safety Improvements 2,200,000 2 (Base Project Allocation - $2,000,000) 3 (Design and Contingencies - $200,000) 4 (b) PA 322 5 (1) Farmersville Road to PA 897, Pavement 6 Rehabilitation, Widen Shoulder and 7 Safety Improvements 1,320,000 8 (Base Project Allocation - $1,200,000) 9 (Design and Contingencies - $120,000) 10 (c) PA 372 11 (1) Oak Bottom Road to Germantown Avenue, 12 Pavement Rehabilitation and Safety 13 Improvements 2,200,000 14 (Base Project Allocation - $2,000,000) 15 (Design and Contingencies - $200,000) 16 (d) PA 896 17 (1) US 30 to Strasburg Borough, Pavement 18 Rehabilitation, Widen Shoulder and 19 Safety Improvements 1,980,000 20 (Base Project Allocation - $1,800,000) 21 (Design and Contingencies - $180,000) 22 (2) Strasburg Borough to PA 372, Valley 23 Road, Pavement Rehabilitation and 24 Safety Improvements 2,338,000 25 (Base Project Allocation - $2,126,000) 26 (Design and Contingencies - $212,000) 27 (e) PA 897 28 (1) Amish Road to Adamstown Road, Pavement 29 Rehabilitation and Safety Improvements 3,850,000 30 (Base Project Allocation - $3,500,000) 19970S0185B0178 - 29 -
1 (Design and Contingencies - $350,000) 2 (f) US 30 3 (1) US 222 to PA 340 3,000,000 4 (Design and Contingencies - $3,000,000) 5 (2) PA 741 to PA 72 3,000,000 6 (Design and Contingencies - $3,000,000) 7 (3) PA 896 to PA 897 3,000,000 8 (Design and Contingencies - $3,000,000) 9 (4) PA 896 to PA 41, Environmental Impact 10 Study 1,000,000 11 (Design and Contingencies - $1,000,000) 12 (g) SR 2015 13 (1) Strasburg Borough to PA 372, Pavement 14 Rehabilitation and Safety Improvements 2,860,000 15 (Base Project Allocation - $2,600,000) 16 (Design and Contingencies - $260,000) 17 (h) SR 2040 18 (1) Paradise Lane to PA 741, Pavement 19 Rehabilitation and Safety Improvements 671,000 20 (Base Project Allocation - $610,000) 21 (Design and Contingencies - $61,000) 22 (i) SR 3017 23 (1) PA 462 to Harrisburg Pike, Pavement 24 Rehabilitation and Safety Improvements 7,700,000 25 (Base Project Allocation - $7,000,000) 26 (Design and Contingencies - $700,000) 27 (j) PA 41 28 (1) PA 926 to US 30, Major Investment 29 Study 500,000 30 (Design and Contingencies - $500,000) 19970S0185B0178 - 30 -
1 Section 337. Lawrence County (Reserved). 2 Section 338. Lebanon County. 3 (a) I-81 4 (1) I-78 to Schuylkill County Line, 5 Pavement Rehabilitation and Safety 6 Improvements 1,500,000 7 (Base Project Allocation - $1,342,000) 8 (Land Allocation - $8,000) 9 (Design and Contingencies - $150,000) 10 (b) US 322 11 (1) PA 934/241 to PA 419, Intersection 12 Improvements 456,000 13 (Base Project Allocation - $410,000) 14 (Land Allocation - $28,000) 15 (Design and Contingencies - $18,000) 16 (c) SR 0897 17 (1) From SR 0501 West and Southwest beyond 18 intersection with SR 0419, Heidelberg 19 Township, reconstruct roadway 12,000,000 20 (Base Construction Allocation - 21 $12,000,000) 22 (d) I-78 23 (1) Construction of complete interchange 24 at intersection of I-78 and SR 343 in 25 Bethel Township 12,000,000 26 (Base Construction Allocation - 27 $8,000,000) 28 (Land Allocation - $2,000,000) 29 (Design and Contingencies - $2,000,000) 30 (e) SR 501 19970S0185B0178 - 31 -
1 (1) Construction of bypass of SR 501 on 2 the west side of Schafferstown from 3 Main Street to vicinity of Michter's 4 Road, Heidelberg Township 8,000,000 5 (Base Construction Allocation - 6 $6,000,000) 7 (Land Allocation - $1,000,000) 8 (Design and Contingencies - $1,000,000) 9 Section 339. Lehigh County. 10 (a) SR 1017 and SR 1008 11 (1) Reconstruct and Improve Mauch Chunk 12 Road, Schadt Avenue and Rural Road in 13 Whitehall Township 1,073,000 14 (Base Project Allocation - $774,000) 15 (Land Allocation - $120,000) 16 (Design and Contingencies - $179,000) 17 Section 340. Luzerne County. 18 (a) I-80 19 (1) White Haven to Carbon County Line, 20 Pavement Rehabilitation and Safety 21 Improvements 101,000 22 (Base Project Allocation - $90,000) 23 (Land Allocation - $1,000) 24 (Design and Contingencies - $10,000) 25 (b) I-81 26 (1) Schuylkill County Line to I-80, 27 Pavement Rehabilitation and Safety 28 Improvements 1,200,000 29 (Base Project Allocation - $1,074,000) 30 (Land Allocation - $6,000) 19970S0185B0178 - 32 -
1 (Design and Contingencies - $120,000) 2 (2) PA 29 to Lackawanna County Line, 3 Pavement Rehabilitation and Safety 4 Improvements 1,400,000 5 (Base Project Allocation - $1,253,000) 6 (Land Allocation - $7,000) 7 (Design and Contingencies - $140,000) 8 (c) SR 2007 9 (1) Reconstruction of Northampton Street 10 and SR 6309 at the Interchange of SR 11 2007 and SR 6309 900,000 12 (Base Project Allocation - $750,000) 13 (Land Allocation - $50,000) 14 (Design and Contingencies - $100,000) 15 Section 341. Lycoming County. 16 (a) SR 220 17 (1) Shrewsbury Township, SR 220 North of 18 Tivoli to T-650, Raise Grade to Reduce 19 Flooding 750,000 20 (Base Project Allocation - $600,000) 21 (Land Allocation - $50,000) 22 (Design and Contingencies - $100,000) 23 (2) Shrewsbury Township, SR 220 South of 24 Glen Mawr to SR 2083, 0.7 Mile 25 Reconstruction, Improve Horizontal and 26 Vertical Alignment 1,250,000 27 (Base Project Allocation - $1,000,000) 28 (Land Allocation - $50,000) 29 (Design and Contingencies - $200,000) 30 (3) Shrewsbury Township, SR 220 North of 19970S0185B0178 - 33 -
1 Glen Mawr to Former LR 41035 Turnback 2 Route, 0.3 Mile Reconstruction 720,000 3 (Base Project Allocation - $600,000) 4 (Land Allocation - $20,000) 5 (Design and Contingencies - $100,000) 6 (b) SR 405 7 (1) Muncy Creek Township, SR 405, East of 8 Muncy between I-180 and PA 405/PA 442 9 Intersection, 0.5 Mile Reconstruction, 10 Raise Grade to Reduce Flooding 950,000 11 (Base Project Allocation - $800,000) 12 (Land Allocation - $50,000) 13 (Design and Contingencies - $100,000) 14 Section 342. McKean County (Reserved). 15 Section 343. Mercer County. 16 (a) I-79 17 (1) Lawrence County Line to Crawford 18 County Line, Pavement Rehabilitation 19 and Safety Improvements 2,600,000 20 (Base Project Allocation - $2,327,000) 21 (Land Allocation - $13,000) 22 (Design and Contingencies - $260,000) 23 (b) I-80 24 (1) PA 173 to Venango County Line, Safety 25 Improvements and Pavement 26 Rehabilitation, Length 4.0 Miles 12,600,000 27 (Base Project Allocation - $12,000,000) 28 (Design and Contingencies - $600,000) 29 (c) PA 208 30 (1) From PA 258 to Old Route 258, 19970S0185B0178 - 34 -
1 Including Bridge over I-79, Widen to 48 2 Feet 14,700,000 3 (Base Construction Allocation - 4 $12,500,000) 5 (Land Allocation - $1,000,000) 6 (Design and Contingencies - $1,200,000) 7 Section 344. Mifflin County (Reserved). 8 Section 345. Monroe County. 9 (a) I-80 10 (1) Carbon County Line to PA 115, Pavement 11 Rehabilitation and Safety Improvements 100,000 12 (Base Project Allocation - $89,000) 13 (Land Allocation - $1,000) 14 (Design and Contingencies - $10,000) 15 (2) Construction of Full Interchange at I- 16 80, Exit 44 to Connect with US 611 13,000,000 17 (Base Construction Allocation - 18 $10,000,000) 19 (Land Allocation - $2,000,000) 20 (Design and Contingencies - $1,000,000) 21 (b) SR 115 22 (1) From I-80, at Exit 43, South 23 Approximately 3.5 Miles to Long Pond 24 Road, Stabilize and Widen Shoulders 11,000,000 25 (Base Project Allocation - $10,500,000) 26 (Design and Contingencies - $500,000) 27 Section 346. Montgomery County. 28 (a) Souder Road 29 (1) Reconstruct Portion of Souder Road to 30 Remove Curves in Franconia Township 540,000 19970S0185B0178 - 35 -
1 (Base Project Allocation - $400,000) 2 (Land Allocation - $100,000) 3 (Design and Contingencies - $40,000) 4 Section 347. Montour County. 5 (a) I-80 6 (1) Northumberland County Line to Columbia 7 County Line, Pavement Rehabilitation 8 and Safety Improvements 1,100,000 9 (Base Project Allocation - $984,000) 10 (Land Allocation - $6,000) 11 (Design and Contingencies - $110,000) 12 Section 348. Northampton County. 13 (a) I-78 14 (1) Lehigh County Line to PA 412, Pavement 15 Rehabilitation and Safety Improvements 300,000 16 (Base Project Allocation - $268,000) 17 (Land Allocation - $2,000) 18 (Design and Contingencies - $30,000) 19 Section 349. Northumberland County. 20 (a) I-80 21 (1) PA 254 to Montour County Line, 22 Pavement Rehabilitation and Safety 23 Improvements 100,000 24 (Base Project Allocation - $89,000) 25 (Land Allocation - $1,000) 26 (Design and Contingencies - $10,000) 27 (b) T-577, Marsh Drive 28 (1) Access Road and Related Improvement in 29 Milton Borough and West Chillisquaque 30 Township 1,600,000 19970S0185B0178 - 36 -
1 (Base Project Allocation - $1,100,000) 2 (Land Allocation - $300,000) 3 (Design and Contingencies - $200,000) 4 Section 350. Perry County. 5 (a) SR 17 6 (1) Resurface and Construct Shoulder on SR 7 17 from Jackson Township through 8 Saville Township 1,080,000 9 (Base Project Allocation - $1,000,000) 10 (Design and Contingencies - $80,000) 11 (b) SR 233 12 (1) Resurface and Construct Shoulder on SR 13 233 from Green Park, Tyrone Township to 14 Cumberland County Line 620,000 15 (Base Project Allocation - $600,000) 16 (Design and Contingencies - $20,000) 17 (c) SR 274 18 (1) Resurface and Construct Shoulder on SR 19 274 from Blain, Jackson Township, to 20 Franklin County Line 820,000 21 (Base Project Allocation - $800,000) 22 (Design and Contingencies - $20,000) 23 (d) SR 849 24 (1) Resurface and Construct Shoulder from 25 Newport to SR 34 930,000 26 (Base Project Allocation - $900,000) 27 (Design and Contingencies - $30,000) 28 (e) SR 850 29 (1) Resurface and Construct Shoulder on SR 30 850 from Kistler to Juniata County 19970S0185B0178 - 37 -
1 Line 570,000 2 (Base Project Allocation - $520,000) 3 (Design and Contingencies - $50,000) 4 (2) Resurface and Construct Shoulder on SR 5 850 from SR 34 in Shermans Dale to 6 Village of Keystone 410,000 7 (Base Project Allocation - $400,000) 8 (Design and Contingencies - $10,000) 9 Section 351. Philadelphia County. 10 (a) I-76 11 (1) Route 1 to I-95, Pavement 12 Rehabilitation and Safety Improvements 1,000,000 13 (Base Project Allocation - $895,000) 14 (Land Allocation - $5,000) 15 (Design and Contingencies - $100,000) 16 (b) I-95 17 (1) Delaware County Line to Bucks County 18 Line, Pavement and Bridge 19 Rehabilitation and Safety Improvements 26,440,000 20 (Base Project Allocation - $25,340,000) 21 (Land Allocation - $100,000) 22 (Design and Contingencies - $1,000,000) 23 (c) Germantown Avenue 24 (1) Reconstruct Germantown Avenue 7,500,000 25 Section 352. Pike County (Reserved). 26 Section 353. Potter County. 27 (a) SR 2002 28 (1) Reconstruct to 22 Feet from Germania 29 Station to Galeton 2,595,000 30 (Base Project Allocation - $2,157,000) 19970S0185B0178 - 38 -
1 (Land Allocation - $250,000) 2 (Design and Contingencies - $188,000) 3 Section 354. Schuylkill County. 4 (a) I-81 5 (1) PA 25 to PA 54, Pavement 6 Rehabilitation and Safety Improvements 2,000,000 7 (Base Project Allocation - $1,790,000) 8 (Land Allocation - $10,000) 9 (Design and Contingencies - $200,000) 10 (2) PA 901 Interchange, Reconstruction 800,000 11 (Base Project Allocation - $716,000) 12 (Land Allocation - $4,000) 13 (Design and Contingencies - $80,000) 14 (3) SR 4007, Gordon Road, New Interchange 1,600,000 15 (Base Project Allocation - $1,432,000) 16 (Land Allocation - $8,000) 17 (Design and Contingencies - $160,000) 18 (b) SR 125 19 (1) Resurface and Reconstruct SR 125 from 20 SR 25 to Northumberland County Line 825,000 21 (Base Project Allocation - $750,000) 22 (Design and Contingencies - $75,000) 23 (c) SR 309 24 (1) Intersection Improvements with SR 443, 25 West Penn Township 1,050,000 26 (Base Project Allocation - $1,000,000) 27 (Land Allocation - $40,000) 28 (Design and Contingencies - $10,000) 29 (2) Corridor Study of SR 309 250,000 30 (Design and Contingencies - $250,000) 19970S0185B0178 - 39 -
1 Section 355. Snyder County. 2 (a) US 11/15 3 (1) Golden Strip, Monroe Township, Widen 4 Roadway and Improve the Intersections 5 From North of Selinsgrove Bypass to 6 Shamokin Dam Borough Line, Length 2.0 7 Miles 6,000,000 8 (Base Project Allocation - $5,300,000) 9 (Land Allocation - $500,000) 10 (Design and Contingencies - $200,000) 11 Section 356. Somerset County. 12 (a) US 219 13 (1) Davidsville to US 30 Interchange, 14 Pavement Restoration 1,740,000 15 (Base Project Allocation - $1,640,000) 16 (Design and Contingencies - $100,000) 17 Section 357. Sullivan County (Reserved). 18 Section 358. Susquehanna County. 19 (a) I-81 20 (1) Lackawanna County Line to New York 21 State Line, Pavement Rehabilitation and 22 Safety Improvements 2,600,000 23 (Base Project Allocation - $2,327,000) 24 (Land Allocation - $13,000) 25 (Design and Contingencies - $260,000) 26 Section 359. Tioga County (Reserved). 27 Section 360. Union County. 28 (a) US 15 29 (1) Snyder/Union County Line to T-365, 30 Reconstruction and Safety Improvements 1,900,000 19970S0185B0178 - 40 -
1 (Base Project Allocation - $1,600,000) 2 (Land Allocation - $100,000) 3 (Design and Contingencies - $200,000) 4 Section 361. Venango County (Reserved). 5 Section 362. Warren County (Reserved). 6 Section 363. Washington County. 7 (a) I-70 8 (1) PA 481 to Westmoreland County Line, 9 Pavement Rehabilitation and Safety 10 Improvements 600,000 11 (Base Project Allocation - $537,000) 12 (Land Allocation - $3,000) 13 (Design and Contingencies - $60,000) 14 (b) I-79 15 (1) Greene, Washington, Allegheny, Butler, 16 Lawrence, Mercer, Crawford and Erie 17 County Lines, West Virginia to I-90, 18 Intelligent Transportation Systems 19 Study 75,000 20 (Design and Contingencies - $75,000) 21 (2) Greene County Line to Milepost 48, 22 Pavement Rehabilitation and Safety 23 Improvements 2,500,000 24 (Base Project Allocation - $2,237,000) 25 (Land Allocation - $13,000) 26 (Design and Contingencies - $250,000) 27 Section 364. Wayne County. 28 (a) I-84 29 (1) Lackawanna County Line to Pike County 30 Line, Pavement Rehabilitation and 19970S0185B0178 - 41 -
1 Safety Improvements 600,000 2 (Base Project Allocation - $537,000) 3 (Land Allocation - $3,000) 4 (Design and Contingencies - $60,000) 5 Section 365. Westmoreland County. 6 (a) I-70 7 (1) Washington County Line to I-76, 8 Pavement Rehabilitation and Safety 9 Improvements 1,700,000 10 (Base Project Allocation - $1,521,000) 11 (Land Allocation - $9,000) 12 (Design and Contingencies - $170,000) 13 (b) SR 3111 14 (1) Center Avenue, Borough of New Stanton, 15 Two-Lane Relocation 940,000 16 (Base Project Allocation - $700,000) 17 (Land Allocation - $40,000) 18 (Design and Contingencies - $200,000) 19 (c) SR 982 20 (1) Reconstruction of SR 982, Including 21 Climbing Lanes from Laurelville, Mt. 22 Pleasant Township, to Intersection with 23 SR 31 in Fayette County 6,500,000 24 (Base Project Allocation - $5,000,000) 25 (Land Allocation - $500,000) 26 (Design and Contingencies - $1,000,000) 27 Section 366. Wyoming County (Reserved). 28 Section 367. York County. 29 (a) I-83 30 (1) US 30 to Maryland State Line, Pavement 19970S0185B0178 - 42 -
1 Rehabilitation and Safety Improvements 4,000,000 2 (Base Project Allocation - $3,580,000) 3 (Land Allocation - $20,000) 4 (Design and Contingencies - $400,000) 5 (2) Feasibility Study for New Exit at 6 Windy Hill Road, New Freedom Borough 100,000 7 (Design and Contingencies - $100,000) 8 (b) SR 74 9 (1) Reconstruction of SR 74 from Red Lion 10 to Intersection with SR 2054 1,600,000 11 (Base Project Allocation - $1,500,000) 12 (Design and Contingencies - $100,000) 13 (c) SR 3072 14 (1) Widen SR 3072 to Three Lanes, Hanover 15 Borough 200,000 16 (Base Project Allocation - $100,000) 17 (Land Allocation - $50,000) 18 (Design and Contingencies - $50,000) 19 (d) SR 4001 20 (1) Widen SR 4001 to Three Lanes from US 21 30 to Church Road 4,105,000 22 (Base Project Allocation - $3,476,000) 23 (Land Allocation - $296,000) 24 (Design and Contingencies - $333,000) 25 CHAPTER 5 26 MISCELLANEOUS PROVISIONS 27 Section 501. Federal funds. 28 All moneys received from the Federal Government for the 29 construction of the projects specifically itemized in this act 30 are also hereby appropriated for those projects. 19970S0185B0178 - 43 -
1 Section 502. Allocation of funds. 2 Whenever as determined by the Department of Transportation 3 that the full estimated financial costs of the projects itemized 4 in this act are not necessary for the proper design, acquisition 5 or construction of such projects, the excess funds no longer 6 required may be allocated by the Pennsylvania Department of 7 Transportation to increase the estimated costs of any one or 8 more of the projects specifically itemized in a capital budget. 9 Section 503. Estimated useful life. 10 The General Assembly states that the estimated useful life of 11 the highway capital projects itemized in this act is 30 years. 12 Section 504. Effective date. 13 This act shall take effect immediately. L27L72WMB/19970S0185B0178 - 44 -