PRIOR PRINTER'S NO. 178 PRINTER'S NO. 444
No. 185 Session of 1997
INTRODUCED BY CORMAN AND STOUT, JANUARY 23, 1997
SENATOR CORMAN, TRANSPORTATION, AS AMENDED, FEBRUARY 11, 1997
AN ACT 1 Providing for the highway capital budget PROJECT ITEMIZATION for <-- 2 the fiscal year 1997-1998 1996-1997. <-- 3 The General Assembly of the Commonwealth of Pennsylvania 4 hereby enacts as follows: 5 CHAPTER 1 6 GENERAL PROVISIONS 7 Section 101. Short title. 8 This act shall be known and may be cited as the Highway 9 Capital Budget PROJECT ITEMIZATION Act of 1997-1998 1996-1997. <-- 10 Section 102. Total authorization. 11 The total authorization for the capital projects itemized in 12 this act and to be constructed by the Department of 13 Transportation, its successors or assigns and to be financed 14 from current revenues of the Motor License Fund shall be 15 $2,614,996,000 $2,684,974,000. <-- 16 Section 103. Itemization of public highway projects. 17 Additional capital projects in the category of public highway
1 projects to be constructed by the Department of Transportation, 2 its successors or assigns and to be financed from current 3 revenues of the Motor License Fund are itemized in Chapter 3, 4 together with their respective estimated financial costs. 5 CHAPTER 3 6 ITEMIZED PROJECTS 7 Total 8 Project 9 Project Allocation 10 Section 301. Adams County (Reserved). 11 Section 302. Allegheny County. 12 (a) I-276 13 (1) Milepost 6 North to I-79, Pavement 14 Rehabilitation and Safety Improvements 1,300,000 15 (Base Project Allocation - $1,163,000) 16 (Land Allocation - $7,000) 17 (Design and Contingencies - $130,000) 18 (b) I-376 19 (1) PA 130 to I-76, Pavement 20 Rehabilitation and Safety Improvements 500,000 21 (Base Project Allocation - $447,000) 22 (Land Allocation - $3,000) 23 (Design and Contingencies - $50,000) 24 (2) I-376 Access Ramp, Construction of an 25 Off-Ramp from Parkway East to 26 Pittsburgh Technology Center Site 12,000,000 27 (c) PA 19 28 (1) Gilkeson Road to Cochran Road, 29 Pavement Rehabilitation and Safety 30 Improvements 450,000 19970S0185B0444 - 2 -
1 (Base Project Allocation - $450,000) 2 (d) Fort Duquesne Boulevard 3 (1) Realignment of Fort Duquesne 4 Boulevard 8,400,000 5 (e) Liberty Avenue 6 (1) Reconstruction of Liberty Avenue 6,600,000 7 (f) North Shore Drive 8 (1) Relocation of North Shore Drive to the 9 North Side of Three Rivers Stadium Site 10 in Order to Open Access to the 11 Riverfront 8,100,000 12 (g) I-79 13 (1) Completion of the Interchange at I-79 14 and SR 0060 to Permit Easier Access to 15 Airport 10,000,000 16 (2) Design and construction of an 17 Interchange at I-79 and Parkway West to 18 Permit Easier Access to and from the 19 Airport and I-79 17,125,000 20 (Base Project Allocation - $15,000,000) 21 (Design and Contingencies - $2,125,000) 22 (3) Construct Missing Link Between I-79 23 and Parkway West 16,000,000 24 (h) US 22/30 25 (1) Reconstruction of US 22/30 Between 26 Imperial Exit and McDonald Exit 15,000,000 27 (i) SR 0028 28 (1) Widen SR 0028 Between Downtown and 29 40th Street Bridge 30,000,000 30 (2) Installation of Noise Barriers on both 19970S0185B0444 - 3 -
1 sides of SR 0028 from Highland Park 2 Bridge to Lexington Avenue in Aspinwall 3 Borough 5,000,000 4 (j) SR 0051 5 (1) Reconstruction of Intersection of SR 6 0051 and SR 0088 14,518,000 7 (k) Smithfield Street 8 (1) Reconstruction of the Smithfield 9 Street Bridge to Support Retail 10 Activity 18,000,000 11 (l) Wood Street 12 (1) Reconstruction of Wood Street to 13 Support Retail Activities 27,000,000 14 (m) Fifth and Forbes Reconstruction 15 (1) Reconstruction to Fifth and Forbes 16 Avenue Corridor to Promote Retail 17 Development 12,000,000 18 (n) Golden Triangle Intermodal Facility/LRT 19 Station 20 (1) Development of a New Intermodal 21 Facility and Transit Stop to Serve the 22 Retail Centers in Downtown 13,000,000 23 (o) North Side Intermodal Facility 24 (1) Development of a Major Commuter 25 Interceptor Intermodal Facility and 26 Transit Station on the North Side 34,420,000 27 (p) Findlay Connector 28 (1) Construction of Highway Connection 29 Between Pittsburgh International 30 Airport and Route 22 West in Order to 19970S0185B0444 - 4 -
1 Assist the Development of the Airport 2 Technology Center 100,000,000 3 (q) Cargo Interchange 4 (1) Development of State-of-the-Art Cargo 5 Interchange Facility at the Cargo 6 Terminal of the Greater Pittsburgh 7 International Airport to Support 8 Regional Business Growth in Global 9 Markets 16,000,000 10 (r) Lawrenceville Industrial Access Road 11 (1) Construction of a Highway Bypass to 12 Permit Truck and Passenger Cars Easier 13 Access into and through the 14 Lawrenceville Industrial and Commercial 15 Areas 46,800,000 16 (s) Mon-Fayette Expressway 17 (1) Construction of the Mon-Fayette 18 Expressway from Pittsburgh to Route 51 675,000,000 19 (t) Multi-Modal Corridor 20 (1) Transportation System Connecting 21 Downtown Pittsburgh with the Greater 22 Pittsburgh International Airport 363,750,000 23 (u) Tech World/Airport Transit Connection 24 (1) Creation of a Transit Connection 25 Between the Airport Technology Center 26 and the Greater Pittsburgh 27 International Airport 135,000,000 28 (v) Settlers Cabin Interchange 29 (1) Construction of a New Interchange 30 Along Parkway West in Robinson 19970S0185B0444 - 5 -
1 Township 10,750,000 2 (w) South Portal of Liberty Tubes 3 (1) Construction of a New Free-Flowing 4 Intersection to Accommodate Traffic 5 Flow 23,450,000 6 (x) Ewing Interchange 7 (1) Construction of a New Interchange 8 Along Parkway West in Moon Township 9 Adjacent to the Pittsburgh 10 International Airport 16,350,000 11 (y) West End Circle 12 (1) Purchase of a Portion of West End 13 Branch of Wheeling and Lake Erie 14 Railway Right-of-Way to Accommodate 15 West End Circle Project of PennDOT and 16 Reconstruct Railroad Interchange with 17 CSXT via the Pittsburgh Industrial 18 Railroad South of Bridgeville between 19 Milepost 57 and Milepost 61 12,800,000 20 (Land Allocation - $12,500,000) 21 (Design and Contingencies - $300,000) 22 (z) Pittsburgh Transportation Corridor 23 (1) Purchase Wheeling and Lake Erie 24 Railway Main Right-of-Way from Rook 25 Yard (Milepost 56 to Longview Milepost 26 46) to Create Two New Transportation 27 Corridors to Downtown Pittsburgh 18,400,000 28 (Land Allocation - $18,000,000) 29 (Design and Contingencies - $400,000) 30 (aa) Pittsburgh Technology Center 19970S0185B0444 - 6 -
1 (1) Construction of an Access Road between 2 Pittsburgh Technology Center and South 3 Side of LTV Site 5,000,000 4 (bb) SR 3009 5 (1) Improvement of Intersection of SR 6 3009, Baptist Road, and SR 2040, 7 Broughton Road, Bethel Park 1,200,000 8 (Base Project Allocation - $1,000,000) 9 (Land Allocation - $100,000) 10 (Design and Contingencies - $100,000) 11 (CC) SR 2040 TO SR 88 <-- 12 (1) 200-SPACE PARK'N RIDE LOT 124,000 13 (BASE PROJECT ALLOCATION - $120,000) 14 (LAND ALLOCATION - $2,000) 15 (DESIGN AND CONTINGENCIES - $2,000) 16 (DD) I-279, I-376 17 (1) CONNECTOR, CITY OF PITTSBURGH, NEW 18 CONSTRUCTION 320,000 19 (DESIGN AND CONTINGENCIES - $320,000) 20 Section 303. Armstrong County (Reserved). 21 Section 304. Beaver County. 22 (a) SR 51 23 (1) Reconstruct and rehabilitate SR 51, 24 including hillside in City of 25 Aliquippa 25,000,000 26 (Base Project Allocation 27 - $25,000,000) 28 (B) PA 151 <-- 29 (1) HOPEWELL INDUSTRIAL PARK TO PA 60, 30 HOPEWELL TOWNSHIP, RECONSTRUCTION 83,000 19970S0185B0444 - 7 -
1 (BASE PROJECT ALLOCATION - $75,000) 2 (DESIGN AND CONTINGENCIES - $8,000) 3 Section 305. Bedford County. 4 (a) PA 56 5 (1) PA 56 Extension, Bedford Township 6 Access Road and Related Improvements 325,000 7 (Base Project Allocation - $250,000) 8 (Land Allocation - $50,000) 9 (Design and Contingencies - $25,000) 10 (b) I-99 11 (1) Bedford Borough Line North to Blair 12 County Line, Roadway Rehabilitation and 13 Safety Improvements 1,440,000 14 (Base Project Allocation - $1,320,000) 15 (Land Allocation - $60,000) 16 (Design and Contingencies - $60,000) 17 (c) Construction of Wetlands 18 (1) Construction of Numerous Five-Acre to 19 Ten-Acre Wetland Projects to Be Used 20 for Future Mitigation Purposes for 21 Highway Construction in Bedford, Blair, 22 Cambria, Fulton, Huntingdon and 23 Somerset Counties 500,000 24 (Base Project Allocation - $300,000) 25 (Land Allocation - $50,000) 26 (Design and Contingencies - $150,000) 27 (D) I-99 <-- 28 (1) BEDFORD AND BLAIR COUNTIES, US 220 29 CONVERSION TO I-99 20,000 30 (BASE PROJECT ALLOCATION - $20,000) 19970S0185B0444 - 8 -
1 Section 306. Berks County. 2 (a) I-78 3 (1) Lebanon County Line to East of 4 Frystown, Rehabilitation and Safety 5 Improvements 8,780,000 <-- 6 (Base Project Allocation - $8,500,000) 7 (Land Allocation - $100,000) 8 (Design and Contingencies - $180,000) 9 IMPROVEMENTS 13,395,000 <-- 10 (BASE PROJECT ALLOCATION - $12,500,000) 11 (LAND ALLOCATION - $45,000) 12 (DESIGN AND CONTINGENCIES - $750,000) 13 (2) Hamburg to Lehigh County, Pavement, 14 Bridge Rehabilitation and Safety 15 Improvements 26,127,000 16 (Base Project Allocation - $25,477,000) 17 (Design and Contingencies - $650,000) 18 (b) SR 0183 19 (1) Interchange with SR 0222, Widen Bridge 20 and Reconstruct Interchange 14,500,000 21 (Base Project Allocation - $7,400,000) 22 (Land Allocation - $4,600,000) 23 (Design and Contingencies - $2,500,000) 24 (2) Intersection with SR 3055, Widen 25 Bridge and Reconstruct Interchange 5,000,000 26 (Base Project Allocation - $3,500,000) 27 (Land Allocation - $750,000) 28 (Design and Contingencies - $750,000) 29 (c) US 222 30 (1) Reconstruct US 222 as a Four-Lane 19970S0185B0444 - 9 -
1 Limited Access Highway Between SR 3028 2 (Warren Street Extension) in Cumru 3 Township and the Existing US 222 4 Expressway in Lancaster County 90,200,000 5 (Base Project Allocation - $66,000,000) 6 (Land Allocation - $17,200,000) 7 (Design and Contingencies - $7,000,000) 8 (2) Intersection with SR 0073, 9 Intersection Improvements 903,000 10 (Base Project Allocation - $628,000) 11 (Land Allocation - $175,000) 12 (Design and Contingencies - $100,000) 13 (3) Intersection with SR 0662, 14 Intersection Improvements 551,000 15 (Base Project Allocation - $445,000) 16 (Land Allocation - $51,000) 17 (Design and Contingencies - $55,000) 18 (d) SR 0061 19 (1) SR 3055 to Schuylkill County Line, Add 20 Lanes, Resurface and Shoulder 21 Construction 20,000,000 22 (2) SR 3055 to US 222, Widen Highway, 23 Abolish Existing Railroad Overpass and 24 Construct New Overpass 20,000,000 25 (e) SR 2033 26 (1) Shelbourne Road TR 422 and TR 562, 27 Realignment 6,525,000 28 (Base Project Allocation - $5,375,000) 29 (Land Allocation - $400,000) 30 (Design and Contingencies - $750,000) 19970S0185B0444 - 10 -
1 (f) SR 3055 2 (1) Outer Bypass Rehabilitation, SR 0061 3 to the End of Expressway, 4 Rehabilitation 4,400,000 5 (Base Project Allocation - $2,400,000) 6 (Land Allocation - $1,000,000) 7 (Design and Contingencies - $1,000,000) 8 (g) SR 0737 9 (1) Widen and Reconstruct Between SR 0222 10 and I-78 3,000,000 11 (h) Warren Street Extension 12 (1) Construct a New Four-Lane Limited 13 Access Highway Connecting US 422 in the 14 Borough of Wyomissing to US 222 in 15 Cumru Township. The Proposed Highway 16 would have Interchanges with US 422, PA 17 724 and US 222 72,500,000 18 (Base Project Allocation - $45,500,000) 19 (Land Allocation - $18,800,000) 20 (Design and Contingencies - $8,200,000) 21 (I) SR 422 <-- 22 (1) INTERSECTION WITH TR 662, DOUGLASS 23 TOWNSHIP, RELOCATION AND RECONSTRUCTION 24 OF INTERSECTION 5,000,000 25 Section 307. Blair County. 26 (a) I-99 27 (1) Bedford County Line North to the 28 Village of Bald Eagle, Roadway 29 Rehabilitation and Safety Improvements 1,440,000 30 (Base Project Allocation - $1,320,000) 19970S0185B0444 - 11 -
1 (Land Allocation - $60,000) 2 (Design and Contingencies - $60,000) 3 (2) Construction of New Interchange with 4 US 220 at Kettle Street to Juniata Gap 5 Road at Chestnut Avenue 90,000,000 6 (Base Project Allocation - $79,000,000) 7 (Land Allocation - $1,000,000) 8 (Design and Contingencies - 9 $10,000,000) 10 (b) SR 4027 11 (1) Reconstruction and/or Relocation in 12 Tyrone Borough and Snyder Township 3,200,000 13 (Base Project Allocation - $2,500,000) 14 (Land Allocation - $200,000) 15 (Design and Contingencies - $500,000) 16 (c) SR 4008 17 (1) Reconstruction of Horseshoe Curve Road 18 from 40th Street and Board Avenue to US 19 22 at Gallitzin Interchange in Cambria 20 County 4,901,000 21 (Base Project Allocation - $4,198,000) 22 (Land Allocation - $350,000) 23 (Design and Contingencies - $353,000) 24 (d) Chestnut Avenue Extension 25 (1) Complete Construction of Chestnut 26 Avenue Extension 27,000,000 27 (Base Project Allocation - $17,000,000) 28 (Land Allocation - $5,000,000) 29 (Design and Contingencies - $5,000,000) 30 Section 308. Bradford County. 19970S0185B0444 - 12 -
1 (a) SR 14 2 (1) Canton Township, Intersection of PA 14 3 and SR 3012, Village of Grover, 0.5 4 Mile Reconstruction, Improve Horizontal 5 Alignment and Intersection 2,100,000 6 (Base Project Allocation - $1,800,000) 7 (Land Allocation - $100,000) 8 (Design and Contingencies - $200,000) 9 Section 309. Bucks County. 10 (a) I-95 11 (1) Philadelphia County to New Jersey 12 State Line, Pavement Rehabilitation and 13 Safety Improvements 1,900,000 14 (Base Project Allocation - $1,700,000) 15 (Land Allocation - $10,000) 16 (Design and Contingencies - $190,000) 17 (b) SR 309 18 (1) County Line Road, Hilltown Township to 19 Bethlehem Road, West Rockhill Township, 20 Pavement Rehabilitation, Shoulders and 21 Safety Improvements 2,000,000 22 (Base Project Allocation - $1,500,000) 23 (Land Allocation - $150,000) 24 (Design and Contingencies - $350,000) 25 (c) SR 313 26 (1) New Galena Road, New Britain Township 27 to Stump Road, New Britain Township, 28 Install Truck Climbing Lane in 29 Westbound Direction 750,000 30 (Base Project Allocation - $500,000) 19970S0185B0444 - 13 -
1 (Land Allocation - $150,000) 2 (Design and Contingencies - $100,000) 3 (d) SR 332 4 (1) Newtown and Lower Makefield Townships, 5 at Lindenhurst Road, SR 2069, Widening, 6 Intersection Improvements and Highway 7 Restoration 1,000,000 8 (Base Project Allocation - $1,000,000) 9 Section 310. Butler County. 10 (a) US 422 11 (1) Intersection Improvements and 12 Installation of New Traffic Signals at 13 Intersection of US 422, SR 0038 and SR 14 0068 8,000,000 15 (2) Restoration of US 422 in Muddycreek 16 and Franklin Townships 10,100,000 17 (Base Project Allocation - $10,000,000) 18 (Design and Contingencies - $100,000) 19 (b) Hansen Avenue 20 (1) Installation of New Traffic Signals at 21 Hansen Avenue in Butler Township 160,000 22 (c) SR 0068 23 (1) Installation of Traffic Signals at 24 Intersection with Whitestown Road 50,000 25 (2) Installation of Traffic Signals at 26 Intersection with Stevenson Road 50,000 27 (d) SR 0356 28 (1) Widen SR 0356 from Silverville Road to 29 Riemer Road 5,000,000 30 (e) SR 0228 19970S0185B0444 - 14 -
1 (1) Installation of Traffic Signals at 2 Intersection with South Pike Road 200,000 3 (2) Restoration, Reconstruction and 4 Widening of SR 228 from SR 3015 to SR 8 5 South 9,700,000 6 (Base Project Allocation - $8,000,000) 7 (Land Allocation - $1,000,000) 8 (Design and Contingencies - $700,000) 9 (3) Restoration, Reconstruction and 10 Widening of SR 228 from SR 8 South to 11 SR 356 21,500,000 12 (Base Project Allocation - $18,000,000) 13 (Land Allocation - $2,000,000) 14 (Design and Contingencies - $1,500,000) 15 (f) South Pike Road 16 (1) Installation of Traffic Signals at 17 Intersection with Monroe Road 200,000 18 (g) SR 528 19 (1) Reconstruction of Existing Interchange 20 in Jackson Township 1,900,000 21 (Base Project Allocation - $1,400,000) 22 (Land Allocation - $200,000) 23 (Design and Contingencies - $300,000) 24 (h) SR 3025 25 (1) Reconstruction of Existing Interchange 26 in Jackson Township 4,100,000 27 (Base Project Allocation - $3,500,000) 28 (Land Allocation - $300,000) 29 (Design and Contingencies - $300,000) 30 (i) SR 8 19970S0185B0444 - 15 -
1 (1) Restoration and Reconstruction of SR 8 2 South in City of Butler and Butler, 3 Penn and Middlesex Townships 16,700,000 4 (Base Project Allocation - $15,000,000) 5 (Land Allocation - $1,000,000) 6 (Design and Contingencies - $700,000) 7 Section 311. Cambria County. 8 (a) US 219 9 (1) Scalp Avenue to Davidsville, Pavement 10 Restoration 1,392,000 11 (Base Project Allocation - $1,312,000) 12 (Design and Contingencies - $80,000) 13 (b) SR 4021 14 (1) Construct Access Road from SR 4021 to 15 Hastings Area Industrial Park 1,300,000 16 (C) PA 56 <-- 17 (1) HAWS PIKE, LOWER YODER TOWNSHIP 18 ROADWAY REHABILITATION AND SAFETY 19 IMPROVEMENTS 400,000 20 (BASE PROJECT ALLOCATION - $380,000) 21 (DESIGN AND CONTINGENCIES - $20,000) 22 Section 312. Cameron County (Reserved). 23 Section 313. Carbon County. 24 (a) I-80 25 (1) Harmony Lake to Monroe County, 26 Pavement Rehabilitation and Safety 27 Improvements 200,000 28 (Base Project Allocation - $179,000) 29 (Land Allocation - $1,000) 30 (Design and Contingencies - $20,000) 19970S0185B0444 - 16 -
1 Section 314. Centre County. 2 (a) I-80 3 (1) Clearfield County Line to Clinton 4 County, Pavement Rehabilitation and 5 Safety Improvements 3,300,000 6 (Base Project Allocation - $2,953,000) 7 (Land Allocation - $17,000) 8 (Design and Contingencies - $330,000) 9 (2) Marion Township, Exit 24, Interchange 10 Reconstruction 1,560,000 11 (Base Project Allocation - $1,500,000) 12 (Design and Contingencies - $60,000) 13 (3) Boggs Township, Exit 23, Interchange 14 Reconstruction 1,160,000 15 (Base Project Allocation - $1,100,000) 16 (Design and Contingencies - $60,000) 17 (b) PA 504 18 (1) Phillipsburg Borough and Rush 19 Township, Cold Stream Run Bridge to 20 Airport, Two-Lane Reconstruction 400,000 21 (Base Project Allocation - $240,000) 22 (Land Allocation - $60,000) 23 (Design and Contingencies - $100,000) 24 (c) PA 350 25 (1) Climbing Lane and Two-Lane Relocation, 26 North of Bald Eagle to Top of Sandy 27 Ridge Mountain 5,750,000 28 (Base Project Allocation - $5,200,000) 29 (Land Allocation - $150,000) 30 (Design and Contingencies - $400,000) 19970S0185B0444 - 17 -
1 Section 315. Chester County. 2 (a) SR 41 3 (1) Relocation of SR 41 in Southern 4 Chester County 10,000,000 5 (Design and Contingencies - 6 $10,000,000) 7 (2) Upgrade Intersection of SR 41 and SR 8 796 in Londonderry Township 665,000 9 (Base Project Allocation - $600,000) 10 (Land Allocation - $15,000) 11 (Design and Contingencies - $50,000) 12 (3) Upgrade Intersection of SR 41 and Zook 13 Road in West Sadsbury Township 665,000 14 (Base Project Allocation - $600,000) 15 (Land Allocation - $15,000) 16 (Design and Contingencies - $50,000) 17 (b) US 1 18 (1) East Marlborough Township, 19 Transportation Partnership Overpass 3,000,000 20 (Base Project Allocation - $2,500,000) 21 (Land Allocation - $200,000) 22 (Design and Contingencies - $300,000) 23 (c) SR 926 24 (1) Resurface, Widen, Install New Drainage 25 and Improve Intersection Visibility 26 from Route 352 to Route 202 675,000 27 (Base Project Allocation - $325,000) 28 (Land Allocation - $125,000) 29 (Design and Contingencies - $225,000) 30 (d) US 202 19970S0185B0444 - 18 -
1 (1) Signalization of Southbound US 202 2 Off-Ramp at Intersection with Paoli 3 Pike, West Goshen Township 335,000 4 (Base Project Allocation - $250,000) 5 (Design and Contingencies - $85,000) 6 (2) Engineering study of the capacity and 7 potential safety improvements to the 8 ramps, structures and roadway of US 202 9 between US 30 and Swedesford Road 10 interchange in East Whiteland 1,500,000 11 (Design and Contingencies - $1,500,000) 12 (e) Paoli Pike 13 (1) Install New Storm Water Drainage 14 System at Two Locations on Paoli Pike 15 in Willistown Township 482,000 16 (Base Project Allocation - $450,000) 17 (Design and Contingencies - $32,000) 18 (F) US 30 <-- 19 (1) US 30, COATESVILLE-DOWNINGTOWN BYPASS, 20 PRELIMINARY ENGINEERING ANALYSIS FOR 21 UPDATE FROM SR 10 WEST OF COATESVILLE 22 TO EXTON BYPASS 1,000,000 23 Section 316. Clarion County (Reserved). 24 Section 317. Clearfield County. 25 (a) I-80 26 (1) Jefferson County Line to Centre County 27 Line, Pavement Rehabilitation and 28 Safety Improvements 4,100,000 29 (Base Project Allocation - $3,670,000) 30 (Land Allocation - $20,000) 19970S0185B0444 - 19 -
1 (Design and Contingencies - $410,000) 2 (b) US 219 3 (1) SR 219 and SR 4019, South of Dubois, 4 Add Two-Way Left Turn Lane 188,000 5 (Base Project Allocation - $138,000) 6 (Land Allocation - $30,000) 7 (Design and Contingencies - $20,000) 8 Section 318. Clinton County. 9 (a) I-80 10 (1) Centre County Line to Union County 11 Line, Pavement Rehabilitation and 12 Safety Improvements 2,400,000 13 (Base Project Allocation - $2,148,000) 14 (Land Allocation - $12,000) 15 (Design and Contingencies - $240,000) 16 Section 319. Columbia County. 17 (a) PA 54 18 (1) PA 54/61 and PA 42, Village of 19 Centralia, Restoration 150,000 20 (Base Project Allocation - $120,000) 21 (Land Allocation - $6,000) 22 (Design and Contingencies - $24,000) 23 (b) PA 487 24 (1) Knoebels Access Road, Franklin 25 Township, Intersection and Access 26 Improvements 300,000 27 (Base Project Allocation - $180,000) 28 (Land Allocation - $20,000) 29 (Design and Contingencies - $100,000) 30 Section 320. Crawford County. 19970S0185B0444 - 20 -
1 (a) I-79 2 (1) Northbound and Southbound Rest Areas 3 (Sites 19 and 20), Sewage Treatment 4 Plant Improvements, Length 0.5 Mile 1,150,000 5 (Base Project Allocation - $1,000,000) 6 (Design and Contingencies - $150,000) 7 (b) SR 8 8 (1) Intersection Improvements at SR 8 and 9 SR 27 to Provide Additional Truck 10 Turning Radii 205,000 11 (Base Project Allocation - $160,000) 12 (Land Allocation - $10,000) 13 (Design and Contingencies - $35,000) 14 (c) SR 27 15 (1) Install New Signals at Intersections 16 within City of Meadville 275,000 17 (Base Project Allocation - $225,000) 18 (Land Allocation - $20,000) 19 (Design and Contingencies - $30,000) 20 (2) Various Corridor and Spot Improvements 21 on SR 27 between Meadville and 22 Titusville 7,000,000 23 (Base Construction Allocation - 24 $6,000,000) 25 (Land Allocation - $400,000) 26 (Design and Contingencies - $600,000) 27 (d) SR 77 28 (1) Various Corridor and Spot Improvements 29 on SR 77, SR 408 and SR 1010 between 30 Meadville and Titusville 7,000,000 19970S0185B0444 - 21 -
1 (Base Construction Allocation - $ 2 6,000,000) 3 (Land Allocation - $400,000) 4 (Design and Contingencies - $600,000) 5 Section 321. Cumberland County. 6 (a) I-81 7 (1) Exit 12, Interchange with PA 465, 8 Interchange Improvements 1,520,000 9 (Base Construction Allocation - 10 $1,200,000) 11 (Land Allocation - $20,000) 12 (Design and Contingencies - $300,000) 13 Section 322. Dauphin County. 14 (a) I-283 15 (1) PA 441 to I-76, Pavement 16 Rehabilitation and Safety Improvements 200,000 17 (Base Project Allocation - $179,000) 18 (Land Allocation - $1,000) 19 (Design and Contingencies - $20,000) 20 (b) PA 283 21 (1) I-283 to PA 341, Pavement 22 Rehabilitation and Safety Improvements 6,962,000 23 (Base Project Allocation - $6,500,000) 24 (Land Allocation - $2,000) 25 (Design and Contingencies - $460,000) 26 (c) US 22 27 (1) Construction of Pedestrian Tunnel or 28 Overhead Crossing of US 22 near Manor 29 Drive in West Hanover Township 3,250,000 30 (Base Project Allocation - $3,000,000) 19970S0185B0444 - 22 -
1 (Land Allocation - $100,000) 2 (Design and Contingencies - $150,000) 3 (d) Pleasant View Road 4 (1) Install New Signals and Reconstruct 5 Highway-Railroad Grade Crossing on 6 Pleasant View Road, South Hanover 7 Township 190,000 8 (Base Project Allocation - $150,000) 9 (Land Allocation - $20,000) 10 (Design and Contingencies - $20,000) 11 (e) I-81 12 (1) Installation of sound barriers on 13 north and south sides of I-81 from 14 intersection with I-83 to Mountain Road 15 Interchange 5,300,000 16 (Base Project Allocation - $5,000,000) 17 (Design and Contingencies - $300,000) 18 (F) PA 225 <-- 19 (1) BRIARDALE ROAD TO PA 325, MIDDLE 20 PAXTON TOWNSHIP, RESURFACING 116,000 21 (BASE PROJECT ALLOCATION - $116,000) 22 (G) PA 225 23 (1) SOUTH ROAD TO BRIARDALE ROAD, MIDDLE 24 PAXTON TOWNSHIP, WIDEN TO THREE LANES 111,000 25 (BASE PROJECT ALLOCATION - $111,000) 26 Section 323. Delaware County. 27 (a) US 30 28 (1) Ithan Avenue, Villanova University, 29 Pedestrian Tunnel and Turn Lanes 600,000 30 (Base Project Allocation - $600,000) 19970S0185B0444 - 23 -
1 (b) I-95 2 (1) Install Sound Barriers on I-95 on East 3 Side from SR 420 to SR 291 2,100,000 4 (Base Project Allocation - $2,000,000) 5 (Design and Contingencies - $100,000) 6 (C) P & W BIKE/PEDESTRIAN TRAIL <-- 7 (1) RADNOR TOWNSHIP, BIKEWAY 140,000 8 (BASE PROJECT ALLOCATION - $112,000) 9 (DESIGN AND CONTINGENCIES - $28,000) 10 Section 324. Elk County. 11 (a) Osterhout Street 12 (1) From SR 120 Intersection to SR 219 13 Intersection, Reconstruct to 24 Feet 3,585,000 14 (Base Project Allocation - $2,500,000) 15 (Land Allocation - $600,000) 16 (Design and Contingencies - $485,000) 17 (b) Elk County Industrial Park Access Road 18 (1) SR 120, SR 255, SR 1001, SR 1002, SR 19 1003 and SR 1008, Reconstruct to 24 20 Feet 2,882,000 21 (Base Project Allocation - $2,632,000) 22 (Land Allocation - $100,000) 23 (Design and Contingencies - $150,000) 24 (c) US 219 25 (1) Relocation of Allegheny & Eastern 26 Track to Allow for the Construction of 27 a US 219 Bypass of Johnsonburg 5,100,000 28 (Base Construction Allocation - 29 $3,900,000) 30 (Land Allocation - $1,000,000) 19970S0185B0444 - 24 -
1 (Design and Contingencies - $200,000) 2 Section 325. Erie County. 3 (a) SR 4024 4 (1) SR 4024 Extension, US 19 to Bush 5 Industrial Road, Summit Township, 6 Construct New Roadway and Intersection 7 Improvements 620,000 8 (Base Project Allocation - $400,000) 9 (Land Allocation - $120,000) 10 (Design and Contingencies - $100,000) 11 (b) I-79 12 (1) Crawford County Line to I-90 in Erie 13 County, Pavement Rehabilitation and 14 Safety Improvements 1,900,000 15 (Base Project Allocation - $1,700,000) 16 (Land Allocation - $10,000) 17 (Design and Contingencies - $190,000) 18 (c) SR 3006 19 (1) From Bridge to Erie Street, Borough of 20 Edinboro, Add Turn Lanes 64,000 21 (Base Project Allocation - $44,000) 22 (Land Allocation - $10,000) 23 (Design and Contingencies - $10,000) 24 (D) SR 4034 <-- 25 (1) CITY OF ERIE, EAST SIDE ACCESS, PORT 26 ACCESS ROAD TO EAST 6TH STREET, NEW 27 TWO-LANE ROADWAY 1,176,000 28 (BASE PROJECT ALLOCATION - $647,000) 29 (LAND ALLOCATION - $329,000) 30 (DESIGN AND CONTINGENCIES - $200,000) 19970S0185B0444 - 25 -
1 (2) CITY OF ERIE, EAST SIDE ACCESS, EAST 2 6TH STREET TO EAST 12TH STREET, NEW 3 TWO-LANE ROADWAY 830,000 4 (BASE PROJECT ALLOCATION - $30,000) 5 (LAND ALLOCATION - $440,000) 6 (DESIGN AND CONTINGENCIES - $360,000) 7 (3) CITY OF ERIE, EAST SIDE ACCESS, PORT 8 ACCESS ROAD, LARSON TEXT RIGHT-OF-WAY 9 ACQUISITION 200,000 10 (LAND ALLOCATION - $200,000) 11 (E) SR 4016 12 (1) WEST 38TH STREET, SHUNPIKE ROAD TO 13 MYRTLE STREET, REALIGNMENT/RELOCATION 940,000 14 (BASE PROJECT ALLOCATION - $800,000) 15 (LAND ALLOCATION - $50,000) 16 (DESIGN AND CONTINGENCIES - $90,000) 17 (F) SR 0299 18 (1) MILLCREEK TOWNSHIP, POWELL AVENUE 19 RELOCATION 6,300,000 20 (BASE PROJECT ALLOCATION - $4,700,000) 21 (LAND ALLOCATION - $600,000) 22 (DESIGN AND CONTINGENCIES - $1,000,000) 23 (G) SR 4024 24 (1) SUMMIT TOWNSHIP, ROBINSON ROAD 25 EXTENSIONS 11,300,000 26 (BASE PROJECT ALLOCATION - $9,800,000) 27 (LAND ALLOCATION - $700,000) 28 (DESIGN AND CONTINGENCIES - $800,000) 29 (H) SR 4026 30 (1) MILLCREEK TOWNSHIP, SOUTH HILL ROAD 19970S0185B0444 - 26 -
1 EXTENSIONS 6,200,000 2 (BASE PROJECT ALLOCATION - $4,800,000) 3 (LAND ALLOCATION - $750,000) 4 (DESIGN AND CONTINGENCIES - $650,000) 5 Section 326. Fayette County. 6 (a) SR 21 7 (1) SR 21 from Uniontown to Masontown, 8 Safety Improvements 2,000,000 9 (Design and Contingencies - $2,000,000) 10 (b) SR 711 11 (1) SR 711 in Connellsville, Safety 12 Improvements 400,000 13 (Design and Contingencies - $400,000) 14 Section 327. Forest County. 15 (a) SR 666 16 (1) Beaver Run Bridge to Whig Hill 17 Highway, Restoration 980,000 18 (Base Project Allocation - $800,000) 19 (Land Allocation - $30,000) 20 (Design and Contingencies - $150,000) 21 (2) Whig Hill to Little Minister Run 22 Bridge, Restoration 1,380,000 23 (Base Project Allocation - $1,200,000) 24 (Land Allocation - $30,000) 25 (Design and Contingencies - $150,000) 26 (3) East of Upper Sheriff Creek to West of 27 Porcupine Run Bridge, Restoration 2,230,000 28 (Base Project Allocation - $2,000,000) 29 (Land Allocation - $30,000) 30 (Design and Contingencies - $200,000) 19970S0185B0444 - 27 -
1 (4) West of Porcupine Run Bridge to Bobbs
2 Creek Bridge, Restoration 1,530,000
3 (Base Project Allocation - $1,300,000)
4 (Land Allocation - $30,000)
5 (Design and Contingencies - $200,000)
6 (5) Bobbs Creek Bridge to Little Minister
7 Run Bridge, Restoration 1,230,000
8 (Base Project Allocation - $1,000,000)
9 (Land Allocation - $30,000)
10 (Design and Contingencies - $200,000)
11 (6) Village of Lynch to Village of Whig
12 Hill, Howe and Kingsley Townships,
13 Reconstruction 16,500,000
14 (Base Project Allocation - $14,000,000)
15 (Land Allocation - $1,000,000)
16 (Design and Contingencies - $1,500,000)
17 Section 328. Franklin County (Reserved).
18 Section 329. Fulton County.
19 (a) I-70
20 (1) Warfordsburg to Deneen Gap,
21 Rehabilitation and Safety Improvements 637,000
22 (Base Project Allocation - $607,000)
23 (Design and Contingencies - $30,000)
24 Section 330. Greene County (Reserved). <--
25 SECTION 330. GREENE COUNTY. <--
26 (A) I-79
27 (1) 1 MILE NORTH OF KIRBY TO 3 MILES SOUTH
28 OF WAYNESBURG, WHITELEY TOWNSHIP,
29 RESURFACING 360,000
30 (BASE PROJECT ALLOCATION - $340,000)
19970S0185B0444 - 28 -
1 (DESIGN AND CONTINGENCIES - $20,000) 2 (B) I-79 3 (1) 3 MILES SOUTH OF WAYNESBURG TO 4 WAYNESBURG, FRANKLIN TOWNSHIP, 5 RESURFACING 500,000 6 (BASE PROJECT ALLOCATION - $440,000) 7 (DESIGN AND CONTINGENCIES - $60,000) 8 Section 331. Huntingdon County. 9 (a) SR 26 10 (1) Huntingdon Borough and Oneida, Miller, 11 Jackson and Barree Townships, Isolated 12 Improvements along 22 Miles of SR 26, 13 Including Reconstruction and Widening 14 of Pavement, Realignment, Intersection 15 Improvements and Truck Climbing Lanes, 16 to Upgrade Highway to Current 17 Standards 25,500,000 18 (Base Project Allocation - $20,500,000) 19 (Land Allocation - $2,000,000) 20 (Design and Contingencies - $3,000,000) 21 (2) Reconstruction and Corridor 22 Improvements from Huntingdon Borough to 23 Centre County Line 25,000,000 24 (Base Project Allocation - $20,500,000) 25 (Land Allocation - $2,000,000) 26 (Design and Contingencies - $2,500,000) 27 (b) SR 944 28 (1) Engineering and Land Acquisition from 29 Intersection of SR 944 to Village of 30 Cooks 600,000 19970S0185B0444 - 29 -
1 (Land Allocation - $100,000) 2 (Design and Contingencies - $500,000) 3 Section 332. Indiana County (Reserved). 4 Section 333. Jefferson County. 5 (a) I-80 6 (1) Milepost 91 to Clearfield County Line, 7 Pavement Rehabilitation and Safety 8 Improvements 500,000 9 (Base Project Allocation - $447,000) 10 (Land Allocation - $3,000) 11 (Design and Contingencies - $50,000) 12 (2) Exit 15, Railroad Overpass to 13 Westbound Roadside Rest, Interstate 14 Preventative Maintenance 3,580,000 15 (Base Project Allocation - $3,500,000) 16 (Design and Contingencies - $80,000) 17 Section 334. Juniata County (Reserved). 18 Section 335. Lackawanna County. 19 (a) I-81 20 (1) Various routes in Lackawanna and 21 Luzerne Counties, in the Vicinity of 22 Scranton and Wilkes-Barre, Intelligent 23 Transportation Systems Study 80,000 24 (Design and Contingencies - $80,000) 25 (2) Luzerne County Line to Susquehanna 26 County Line, Pavement Rehabilitation 27 and Safety Improvements 2,700,000 28 (Base Project Allocation - $2,416,000) 29 (Land Allocation - $14,000) 30 (Design and Contingencies - $270,000) 19970S0185B0444 - 30 -
1 (3) Reconstruction of I-81 and Davis 2 Street Interchange to Increase Length 3 of Entrance and Exit Ramps 5,000,000 4 (Base Project Allocation - $4,600,000) 5 (Land Allocation - $300,000) 6 (Design and Contingencies - $100,000) 7 (b) I-84 8 (1) I-81 to Wayne County Line, Pavement 9 Rehabilitation and Safety Improvements 1,200,000 10 (Base Project Allocation - $1,074,000) 11 (Land Allocation - $6,000) 12 (Design and Contingencies - $120,000) 13 (c) I-380 14 (1) I-84 to Monroe County Line, Pavement 15 Rehabilitation and Safety Improvements 1,000,000 16 (Base Project Allocation - $895,000) 17 (Land Allocation - $5,000) 18 (Design and Contingencies - $100,000) 19 (d) US 6 and US 11 20 (1) Construction of Clarks Summit Bypass 25,000,000 21 (Base Project Allocation - $24,000,000) 22 (Design and Contingencies - 1,000,000) 23 (2) Construction of Turning Lanes in South 24 Abington Township 1,100,000 25 (Base Project Allocation - $1,000,000) 26 (Design and Contingencies - $100,000) 27 (e) SR 632 28 (1) Reconstruction and Drainage 29 Improvements, South Abington Township 350,000 30 (Base Project Allocation - $300,000) 19970S0185B0444 - 31 -
1 (Design and Contingencies - $50,000) 2 (f) Shady Lane Road 3 (1) Widen Railroad Tunnel 2,000,000 4 (Base Project Allocation - $1,800,000) 5 (Design and Contingencies - $200,000) 6 (g) Keyser - Milwaukee Road 7 (1) Reconstruction of Road from Main 8 Street to Oak Street 250,000 9 (Base Project Allocation - $225,000) 10 (Design and Contingencies - $25,000) 11 Section 336. Lancaster County. 12 (a) PA 23 13 (1) US 30 to Berks County Line, Pavement 14 Rehabilitation and Safety Improvements 2,200,000 15 (Base Project Allocation - $2,000,000) 16 (Design and Contingencies - $200,000) 17 (b) PA 322 18 (1) Farmersville Road to PA 897, Pavement 19 Rehabilitation, Widen Shoulder and 20 Safety Improvements 1,320,000 21 (Base Project Allocation - $1,200,000) 22 (Design and Contingencies - $120,000) 23 (c) PA 372 24 (1) Oak Bottom Road to Germantown Avenue, 25 Pavement Rehabilitation and Safety 26 Improvements 2,200,000 27 (Base Project Allocation - $2,000,000) 28 (Design and Contingencies - $200,000) 29 (d) PA 896 30 (1) US 30 to Strasburg Borough, Pavement 19970S0185B0444 - 32 -
1 Rehabilitation, Widen Shoulder and 2 Safety Improvements 1,980,000 3 (Base Project Allocation - $1,800,000) 4 (Design and Contingencies - $180,000) 5 (2) Strasburg Borough to PA 372, Valley 6 Road, Pavement Rehabilitation and 7 Safety Improvements 2,338,000 8 (Base Project Allocation - $2,126,000) 9 (Design and Contingencies - $212,000) 10 (e) PA 897 11 (1) Amish Road to Adamstown Road, Pavement 12 Rehabilitation and Safety Improvements 3,850,000 13 (Base Project Allocation - $3,500,000) 14 (Design and Contingencies - $350,000) 15 (f) US 30 16 (1) US 222 to PA 340 3,000,000 17 (Design and Contingencies - $3,000,000) 18 (2) PA 741 to PA 72 3,000,000 19 (Design and Contingencies - $3,000,000) 20 (3) PA 896 to PA 897 3,000,000 21 (Design and Contingencies - $3,000,000) 22 (4) PA 896 to PA 41, Environmental Impact 23 Study 1,000,000 24 (Design and Contingencies - $1,000,000) 25 (g) SR 2015 26 (1) Strasburg Borough to PA 372, Pavement 27 Rehabilitation and Safety Improvements 2,860,000 28 (Base Project Allocation - $2,600,000) 29 (Design and Contingencies - $260,000) 30 (h) SR 2040 19970S0185B0444 - 33 -
1 (1) Paradise Lane to PA 741, Pavement 2 Rehabilitation and Safety Improvements 671,000 3 (Base Project Allocation - $610,000) 4 (Design and Contingencies - $61,000) 5 (i) SR 3017 6 (1) PA 462 to Harrisburg Pike, Pavement 7 Rehabilitation and Safety Improvements 7,700,000 8 (Base Project Allocation - $7,000,000) 9 (Design and Contingencies - $700,000) 10 (j) PA 41 11 (1) PA 926 to US 30, Major Investment 12 Study 500,000 13 (Design and Contingencies - $500,000) 14 Section 337. Lawrence County (Reserved). 15 Section 338. Lebanon County. 16 (a) I-81 17 (1) I-78 to Schuylkill County Line, 18 Pavement Rehabilitation and Safety 19 Improvements 1,500,000 20 (Base Project Allocation - $1,342,000) 21 (Land Allocation - $8,000) 22 (Design and Contingencies - $150,000) 23 (b) US 322 24 (1) PA 934/241 to PA 419, Intersection 25 Improvements 456,000 26 (Base Project Allocation - $410,000) 27 (Land Allocation - $28,000) 28 (Design and Contingencies - $18,000) 29 (c) SR 0897 30 (1) From SR 0501 West and Southwest beyond 19970S0185B0444 - 34 -
1 intersection with SR 0419, Heidelberg 2 Township, reconstruct roadway 12,000,000 3 (Base Construction Allocation - 4 $12,000,000) 5 (d) I-78 6 (1) Construction of complete interchange 7 at intersection of I-78 and SR 343 in 8 Bethel Township 12,000,000 9 (Base Construction Allocation - 10 $8,000,000) 11 (Land Allocation - $2,000,000) 12 (Design and Contingencies - $2,000,000) 13 (e) SR 501 14 (1) Construction of bypass of SR 501 on 15 the west side of Schafferstown from 16 Main Street to vicinity of Michter's 17 Road, Heidelberg Township 8,000,000 18 (Base Construction Allocation - 19 $6,000,000) 20 (Land Allocation - $1,000,000) 21 (Design and Contingencies - $1,000,000) 22 Section 339. Lehigh County. 23 (a) SR 1017 and SR 1008 24 (1) Reconstruct and Improve Mauch Chunk 25 Road, Schadt Avenue and Rural Road in 26 Whitehall Township 1,073,000 27 (Base Project Allocation - $774,000) 28 (Land Allocation - $120,000) 29 (Design and Contingencies - $179,000) 30 (B) SR 3017 <-- 19970S0185B0444 - 35 -
1 (1) WIDENING TO FOUR LANES FROM INDUSTRIAL 2 DRIVE TO CITY LINE ROAD, HANOVER 3 TOWNSHIP 2,462,000 4 (BASE PROJECT ALLOCATION - $1,610,000) 5 (LAND ALLOCATION - $572,000) 6 (DESIGN AND CONTINGENCIES - $280,000) 7 (2) WIDENING TO FOUR LANES FROM CITY LINE 8 ROAD TO RACE STREET EXTENSION, HANOVER 9 TOWNSHIP 2,720,000 10 (BASE PROJECT ALLOCATION - $2,036,000) 11 (LAND ALLOCATION - $404,000) 12 (DESIGN AND CONTINGENCIES - $280,000) 13 (C) SR 1004 14 (1) EXTEND FOUR LANES FROM SR 0987 TO SR 15 3017, CATASAUQUA BOROUGH 2,892,000 16 (BASE PROJECT ALLOCATION - $926,000) 17 (LAND ALLOCATION - $1,560,000) 18 (DESIGN AND CONTINGENCIES - $406,000) 19 (2) WIDEN TO FOUR LANES FROM SR 0987 TO 20 WILLOWBROOK ROAD, HANOVER TOWNSHIP 2,770,000 21 (BASE PROJECT ALLOCATION - $1,540,000) 22 (LAND ALLOCATION - $948,000) 23 (DESIGN AND CONTINGENCIES - $282,000) 24 (D) SR 0987 25 (1) WIDEN TO FOUR LANES FROM AVENUE A TO 26 SR 3017, CATASAUQUA BOROUGH 3,660,000 27 (BASE PROJECT ALLOCATION - $2,842,000) 28 (LAND ALLOCATION - $418,000) 29 (DESIGN AND CONTINGENCIES - $400,000) 30 Section 340. Luzerne County. 19970S0185B0444 - 36 -
1 (a) I-80 2 (1) White Haven to Carbon County Line, 3 Pavement Rehabilitation and Safety 4 Improvements 101,000 5 (Base Project Allocation - $90,000) 6 (Land Allocation - $1,000) 7 (Design and Contingencies - $10,000) 8 (b) I-81 9 (1) Schuylkill County Line to I-80, 10 Pavement Rehabilitation and Safety 11 Improvements 1,200,000 12 (Base Project Allocation - $1,074,000) 13 (Land Allocation - $6,000) 14 (Design and Contingencies - $120,000) 15 (2) PA 29 to Lackawanna County Line, 16 Pavement Rehabilitation and Safety 17 Improvements 1,400,000 18 (Base Project Allocation - $1,253,000) 19 (Land Allocation - $7,000) 20 (Design and Contingencies - $140,000) 21 (c) SR 2007 22 (1) Reconstruction of Northampton Street 23 and SR 6309 at the Interchange of SR 24 2007 and SR 6309 900,000 25 (Base Project Allocation - $750,000) 26 (Land Allocation - $50,000) 27 (Design and Contingencies - $100,000) 28 Section 341. Lycoming County. 29 (a) SR 220 30 (1) Shrewsbury Township, SR 220 North of 19970S0185B0444 - 37 -
1 Tivoli to T-650, Raise Grade to Reduce 2 Flooding 750,000 3 (Base Project Allocation - $600,000) 4 (Land Allocation - $50,000) 5 (Design and Contingencies - $100,000) 6 (2) Shrewsbury Township, SR 220 South of 7 Glen Mawr to SR 2083, 0.7 Mile 8 Reconstruction, Improve Horizontal and 9 Vertical Alignment 1,250,000 10 (Base Project Allocation - $1,000,000) 11 (Land Allocation - $50,000) 12 (Design and Contingencies - $200,000) 13 (3) Shrewsbury Township, SR 220 North of 14 Glen Mawr to Former LR 41035 Turnback 15 Route, 0.3 Mile Reconstruction 720,000 16 (Base Project Allocation - $600,000) 17 (Land Allocation - $20,000) 18 (Design and Contingencies - $100,000) 19 (4) SPOT IMPROVEMENTS IN SHREWSBURY AND <-- 20 PENN TOWNSHIPS, LYCOMING COUNTY AND 21 DAVIDSON TOWNSHIP, SULLIVAN COUNTY 9,250,000 22 (BASE PROJECT ALLOCATION - $8,000,000) 23 (LAND ALLOCATION - $250,000) 24 (DESIGN AND CONTINGENCIES - $1,000,000) 25 (b) SR 405 26 (1) Muncy Creek Township, SR 405, East of 27 Muncy between I-180 and PA 405/PA 442 28 Intersection, 0.5 Mile Reconstruction, 29 Raise Grade to Reduce Flooding 950,000 30 (Base Project Allocation - $800,000) 19970S0185B0444 - 38 -
1 (Land Allocation - $50,000) 2 (Design and Contingencies - $100,000) 3 (2) I-180 TO PA 405, MUNCY CREEK TOWNSHIP, <-- 4 RECONSTRUCTION TO REDUCE RECURRENT 5 FLOODING 950,000 6 (BASE PROJECT ALLOCATION - $800,000) 7 (LAND ALLOCATION - $50,000) 8 (DESIGN AND CONTINGENCIES - $100,000) 9 Section 342. McKean County (Reserved). 10 Section 343. Mercer County. 11 (a) I-79 12 (1) Lawrence County Line to Crawford 13 County Line, Pavement Rehabilitation 14 and Safety Improvements 2,600,000 15 (Base Project Allocation - $2,327,000) 16 (Land Allocation - $13,000) 17 (Design and Contingencies - $260,000) 18 (b) I-80 19 (1) PA 173 to Venango County Line, Safety 20 Improvements and Pavement 21 Rehabilitation, Length 4.0 Miles 12,600,000 22 (Base Project Allocation - $12,000,000) 23 (Design and Contingencies - $600,000) 24 (c) PA 208 25 (1) From PA 258 to Old Route 258, 26 Including Bridge over I-79, Widen to 48 27 Feet 14,700,000 28 (Base Construction Allocation - 29 $12,500,000) 30 (Land Allocation - $1,000,000) 19970S0185B0444 - 39 -
1 (Design and Contingencies - $1,200,000) 2 Section 344. Mifflin County (Reserved). 3 Section 345. Monroe County. 4 (a) I-80 5 (1) Carbon County Line to PA 115, Pavement 6 Rehabilitation and Safety Improvements 100,000 7 (Base Project Allocation - $89,000) 8 (Land Allocation - $1,000) 9 (Design and Contingencies - $10,000) 10 (2) Construction of Full Interchange at I- 11 80, Exit 44 to Connect with US 611 13,000,000 12 (Base Construction Allocation - 13 $10,000,000) 14 (Land Allocation - $2,000,000) 15 (Design and Contingencies - $1,000,000) 16 (b) SR 115 17 (1) From I-80, at Exit 43, South 18 Approximately 3.5 Miles to Long Pond 19 Road, Stabilize and Widen Shoulders 11,000,000 20 (Base Project Allocation - $10,500,000) 21 (Design and Contingencies - $500,000) 22 Section 346. Montgomery County. 23 (a) Souder Road 24 (1) Reconstruct Portion of Souder Road to 25 Remove Curves in Franconia Township 540,000 26 (Base Project Allocation - $400,000) 27 (Land Allocation - $100,000) 28 (Design and Contingencies - $40,000) 29 (B) SR 0029 <-- 30 (1) COLLEGEVILLE BOROUGH, SR 0029 19970S0185B0444 - 40 -
1 REALIGNMENT BETWEEN MAIN STREET AND 1ST 2 AVENUE 1,900,000 3 (BASE PROJECT ALLOCATION - $750,000) 4 (LAND ALLOCATION - $950,000) 5 (DESIGN AND CONTINGENCIES - $200,000) 6 (C) PA 23 7 (1) RIVER ROAD AT BALLIGOMINGO, WEST 8 CONSHOHOCKEN TOWNSHIP, ROADWAY 9 RELOCATION AND RESIGNALIZATION 424,000 10 (BASE PROJECT ALLOCATION - $400,000) 11 (LAND ALLOCATION - $24,000) 12 (D) PA 463 13 (1) US 611 TO PA 152, HORSHAM TOWNSHIP, 14 INTERSECTION IMPROVEMENTS, WIDENING AND 15 RESTORATION 830,000 16 (BASE PROJECT ALLOCATION - $650,000) 17 (LAND ALLOCATION - $55,000) 18 (DESIGN AND CONTINGENCIES - $125,000) 19 Section 347. Montour County. 20 (a) I-80 21 (1) Northumberland County Line to Columbia 22 County Line, Pavement Rehabilitation 23 and Safety Improvements 1,100,000 24 (Base Project Allocation - $984,000) 25 (Land Allocation - $6,000) 26 (Design and Contingencies - $110,000) 27 Section 348. Northampton County. 28 (a) I-78 29 (1) Lehigh County Line to PA 412, Pavement 30 Rehabilitation and Safety Improvements 300,000 19970S0185B0444 - 41 -
1 (Base Project Allocation - $268,000) 2 (Land Allocation - $2,000) 3 (Design and Contingencies - $30,000) 4 Section 349. Northumberland County. 5 (a) I-80 6 (1) PA 254 to Montour County Line, 7 Pavement Rehabilitation and Safety 8 Improvements 100,000 9 (Base Project Allocation - $89,000) 10 (Land Allocation - $1,000) 11 (Design and Contingencies - $10,000) 12 (b) T-577, Marsh Drive 13 (1) Access Road and Related Improvement in 14 Milton Borough and West Chillisquaque 15 Township 1,600,000 16 (Base Project Allocation - $1,100,000) 17 (Land Allocation - $300,000) 18 (Design and Contingencies - $200,000) 19 (C) I-80 <-- 20 (1) MILEPOST 207 TO MILEPOST 214, 21 RESTORATION 600,000 22 (DESIGN AND CONTINGENCIES - $600,000) 23 Section 350. Perry County. 24 (a) SR 17 25 (1) Resurface and Construct Shoulder on SR 26 17 from Jackson Township through 27 Saville Township 1,080,000 28 (Base Project Allocation - $1,000,000) 29 (Design and Contingencies - $80,000) 30 (b) SR 233 19970S0185B0444 - 42 -
1 (1) Resurface and Construct Shoulder on SR 2 233 from Green Park, Tyrone Township to 3 Cumberland County Line 620,000 4 (Base Project Allocation - $600,000) 5 (Design and Contingencies - $20,000) 6 (c) SR 274 7 (1) Resurface and Construct Shoulder on SR 8 274 from Blain, Jackson Township, to 9 Franklin County Line 820,000 10 (Base Project Allocation - $800,000) 11 (Design and Contingencies - $20,000) 12 (d) SR 849 13 (1) Resurface and Construct Shoulder from 14 Newport to SR 34 930,000 15 (Base Project Allocation - $900,000) 16 (Design and Contingencies - $30,000) 17 (e) SR 850 18 (1) Resurface and Construct Shoulder on SR 19 850 from Kistler to Juniata County 20 Line 570,000 21 (Base Project Allocation - $520,000) 22 (Design and Contingencies - $50,000) 23 (2) Resurface and Construct Shoulder on SR 24 850 from SR 34 in Shermans Dale to 25 Village of Keystone 410,000 26 (Base Project Allocation - $400,000) 27 (Design and Contingencies - $10,000) 28 Section 351. Philadelphia County. 29 (a) I-76 30 (1) Route 1 to I-95, Pavement 19970S0185B0444 - 43 -
1 Rehabilitation and Safety Improvements 1,000,000 2 (Base Project Allocation - $895,000) 3 (Land Allocation - $5,000) 4 (Design and Contingencies - $100,000) 5 (b) I-95 6 (1) Delaware County Line to Bucks County 7 Line, Pavement and Bridge 8 Rehabilitation and Safety Improvements 26,440,000 9 (Base Project Allocation - $25,340,000) 10 (Land Allocation - $100,000) 11 (Design and Contingencies - $1,000,000) 12 (c) Germantown Avenue 13 (1) Reconstruct Germantown Avenue 7,500,000 14 (D) SR 1007 <-- 15 (1) ADAMS AVENUE CONNECTOR, TORRESDALE TO 16 ARAMINGO AVENUE, NEW ROADWAY 376,000 17 (BASE PROJECT ALLOCATION - $286,000) 18 (LAND ALLOCATION - $70,000) 19 (DESIGN AND CONTINGENCIES - $20,000) 20 (E) I-95 21 (1) JACKSON STREET TO RITNER AVENUE, (200 22 BLOCK OF FRONT STREET), INSTALL 23 SAFETY/PROTECTIVE WALL 44,000 24 (BASE PROJECT ALLOCATION - $35,000) 25 (DESIGN AND CONTINGENCIES - $9,000 26 Section 352. Pike County (Reserved). 27 Section 353. Potter County. 28 (a) SR 2002 29 (1) Reconstruct to 22 Feet from Germania 30 Station to Galeton 2,595,000 19970S0185B0444 - 44 -
1 (Base Project Allocation - $2,157,000) 2 (Land Allocation - $250,000) 3 (Design and Contingencies - $188,000) 4 Section 354. Schuylkill County. 5 (a) I-81 6 (1) PA 25 to PA 54, Pavement 7 Rehabilitation and Safety Improvements 2,000,000 8 (Base Project Allocation - $1,790,000) 9 (Land Allocation - $10,000) 10 (Design and Contingencies - $200,000) 11 (2) PA 901 Interchange, Reconstruction 800,000 12 (Base Project Allocation - $716,000) 13 (Land Allocation - $4,000) 14 (Design and Contingencies - $80,000) 15 (3) SR 4007, Gordon Road, New Interchange 1,600,000 16 (Base Project Allocation - $1,432,000) 17 (Land Allocation - $8,000) 18 (Design and Contingencies - $160,000) 19 (b) SR 125 20 (1) Resurface and Reconstruct SR 125 from 21 SR 25 to Northumberland County Line 825,000 22 (Base Project Allocation - $750,000) 23 (Design and Contingencies - $75,000) 24 (c) SR 309 25 (1) Intersection Improvements with SR 443, 26 West Penn Township 1,050,000 27 (Base Project Allocation - $1,000,000) 28 (Land Allocation - $40,000) 29 (Design and Contingencies - $10,000) 30 (2) Corridor Study of SR 309 250,000 19970S0185B0444 - 45 -
1 (Design and Contingencies - $250,000)
2 Section 355. Snyder County.
3 (a) US 11/15
4 (1) Golden Strip, Monroe Township, Widen
5 Roadway and Improve the Intersections
6 From North of Selinsgrove Bypass to
7 Shamokin Dam Borough Line, Length 2.0
8 Miles 6,000,000
9 (Base Project Allocation - $5,300,000)
10 (Land Allocation - $500,000)
11 (Design and Contingencies - $200,000)
12 Section 356. Somerset County.
13 (a) US 219
14 (1) Davidsville to US 30 Interchange,
15 Pavement Restoration 1,740,000
16 (Base Project Allocation - $1,640,000)
17 (Design and Contingencies - $100,000)
18 Section 357. Sullivan County (Reserved).
19 Section 358. Susquehanna County.
20 (a) I-81
21 (1) Lackawanna County Line to New York
22 State Line, Pavement Rehabilitation and
23 Safety Improvements 2,600,000
24 (Base Project Allocation - $2,327,000)
25 (Land Allocation - $13,000)
26 (Design and Contingencies - $260,000)
27 Section 359. Tioga County (Reserved). <--
28 SECTION 359. TIOGA COUNTY. <--
29 (A) US 15
30 (1) BRIDGE SPANNING TIOGA DAM, NEW TWO-
19970S0185B0444 - 46 -
1 LANE BRIDGE 125,000 2 (DESIGN AND CONTINGENCIES - $125,000) 3 Section 360. Union County. 4 (a) US 15 5 (1) Snyder/Union County Line to T-365, 6 Reconstruction and Safety Improvements 1,900,000 7 (Base Project Allocation - $1,600,000) 8 (Land Allocation - $100,000) 9 (Design and Contingencies - $200,000) 10 Section 361. Venango County (Reserved). 11 Section 362. Warren County (Reserved). 12 Section 363. Washington County. 13 (a) I-70 14 (1) PA 481 to Westmoreland County Line, 15 Pavement Rehabilitation and Safety 16 Improvements 600,000 17 (Base Project Allocation - $537,000) 18 (Land Allocation - $3,000) 19 (Design and Contingencies - $60,000) 20 (b) I-79 21 (1) Greene, Washington, Allegheny, Butler, 22 Lawrence, Mercer, Crawford and Erie 23 County Lines, West Virginia to I-90, 24 Intelligent Transportation Systems 25 Study 75,000 26 (Design and Contingencies - $75,000) 27 (2) Greene County Line to Milepost 48, 28 Pavement Rehabilitation and Safety 29 Improvements 2,500,000 30 (Base Project Allocation - $2,237,000) 19970S0185B0444 - 47 -
1 (Land Allocation - $13,000) 2 (Design and Contingencies - $250,000) 3 (3) MILEPOST 39.4 TO MILEPOST 42, <-- 4 MEADOWLANDS AREA, RESURFACING 240,000 5 (BASE PROJECT ALLOCATION - $220,000) 6 (DESIGN AND CONTINGENCIES - $20,000) 7 Section 364. Wayne County. 8 (a) I-84 9 (1) Lackawanna County Line to Pike County 10 Line, Pavement Rehabilitation and 11 Safety Improvements 600,000 12 (Base Project Allocation - $537,000) 13 (Land Allocation - $3,000) 14 (Design and Contingencies - $60,000) 15 Section 365. Westmoreland County. 16 (a) I-70 17 (1) Washington County Line to I-76, 18 Pavement Rehabilitation and Safety 19 Improvements 1,700,000 20 (Base Project Allocation - $1,521,000) 21 (Land Allocation - $9,000) 22 (Design and Contingencies - $170,000) 23 (b) SR 3111 24 (1) Center Avenue, Borough of New Stanton, 25 Two-Lane Relocation 940,000 26 (Base Project Allocation - $700,000) 27 (Land Allocation - $40,000) 28 (Design and Contingencies - $200,000) 29 (c) SR 982 30 (1) Reconstruction of SR 982, Including 19970S0185B0444 - 48 -
1 Climbing Lanes from Laurelville, Mt. 2 Pleasant Township, to Intersection with 3 SR 31 in Fayette County 6,500,000 4 (Base Project Allocation - $5,000,000) 5 (Land Allocation - $500,000) 6 (Design and Contingencies - $1,000,000) 7 Section 366. Wyoming County (Reserved). 8 Section 367. York County. 9 (a) I-83 10 (1) US 30 to Maryland State Line, Pavement 11 Rehabilitation and Safety Improvements 4,000,000 12 (Base Project Allocation - $3,580,000) 13 (Land Allocation - $20,000) 14 (Design and Contingencies - $400,000) 15 (2) Feasibility Study for New Exit at 16 Windy Hill Road, New Freedom Borough 100,000 17 (Design and Contingencies - $100,000) 18 (b) SR 74 19 (1) Reconstruction of SR 74 from Red Lion 20 to Intersection with SR 2054 1,600,000 21 (Base Project Allocation - $1,500,000) 22 (Design and Contingencies - $100,000) 23 (c) SR 3072 24 (1) Widen SR 3072 to Three Lanes, Hanover 25 Borough 200,000 26 (Base Project Allocation - $100,000) 27 (Land Allocation - $50,000) 28 (Design and Contingencies - $50,000) 29 (d) SR 4001 30 (1) Widen SR 4001 to Three Lanes from US 19970S0185B0444 - 49 -
1 30 to Church Road 4,105,000 2 (Base Project Allocation - $3,476,000) 3 (Land Allocation - $296,000) 4 (Design and Contingencies - $333,000) 5 SECTION 368. STATEWIDE WETLAND MITIGATION. <-- 6 (A) STATEWIDE 7 (1) CONSTRUCTION OF ADVANCED WETLAND 8 MITIGATION PROJECTS NECESSARY TO 9 REPLACE WETLANDS DISPLACED BY HIGHWAY 10 PROJECTS 1,000,000 11 (BASE PROJECT ALLOCATION - $800,000) 12 (LAND ALLOCATION - $100,000) 13 (DESIGN AND CONTINGENCIES - $100,000) 14 CHAPTER 5 15 MISCELLANEOUS PROVISIONS 16 Section 501. Federal funds. 17 All moneys received from the Federal Government for the 18 construction of the projects specifically itemized in this act 19 are also hereby appropriated for those projects. 20 Section 502. Allocation of funds. 21 Whenever as determined by the Department of Transportation 22 that the full estimated financial costs of the projects itemized 23 in this act are not necessary for the proper design, acquisition 24 or construction of such projects, the excess funds no longer 25 required may be allocated by the Pennsylvania Department of 26 Transportation to increase the estimated costs of any one or 27 more of the projects specifically itemized in a capital budget. 28 Section 503. Estimated useful life. 29 The General Assembly states that the estimated useful life of 30 the highway capital projects itemized in this act is 30 years. 19970S0185B0444 - 50 -
1 Section 504. Effective date. 2 This act shall take effect immediately. L27L72WMB/19970S0185B0444 - 51 -