PRIOR PRINTER'S NOS. 178, 444 PRINTER'S NO. 697
No. 185 Session of 1997
INTRODUCED BY CORMAN AND STOUT, JANUARY 23, 1997
SENATOR TILGHMAN, APPROPRIATIONS, RE-REPORTED AS AMENDED, MARCH 11, 1997
AN ACT
1 Providing for the highway capital budget project itemization for
2 the fiscal year 1996-1997.
3 The General Assembly of the Commonwealth of Pennsylvania
4 hereby enacts as follows:
5 CHAPTER 1
6 GENERAL PROVISIONS
7 Section 101. Short title.
8 This act shall be known and may be cited as the Highway
9 Capital Budget Project Itemization Act of 1996-1997.
10 Section 102. Total authorization.
11 The total authorization for the capital projects itemized in
12 this act and to be constructed by the Department of
13 Transportation, its successors or assigns and to be financed
14 from current revenues of the Motor License Fund shall be
15 $2,684,974,000 $2,971,444,000. <--
16 Section 103. Itemization of public highway projects.
17 Additional capital projects in the category of public highway
1 projects to be constructed by the Department of Transportation, 2 its successors or assigns and to be financed from current 3 revenues of the Motor License Fund are itemized in Chapter 3, 4 together with their respective estimated financial costs. 5 CHAPTER 3 6 ITEMIZED PROJECTS 7 Total 8 Project 9 Project Allocation 10 Section 301. Adams County (Reserved). 11 Section 302. Allegheny County. 12 (a) I-276 13 (1) Milepost 6 North to I-79, Pavement 14 Rehabilitation and Safety Improvements 1,300,000 15 (Base Project Allocation - $1,163,000) 16 (Land Allocation - $7,000) 17 (Design and Contingencies - $130,000) 18 (b) I-376 19 (1) PA 130 to I-76, Pavement 20 Rehabilitation and Safety Improvements 500,000 21 (Base Project Allocation - $447,000) 22 (Land Allocation - $3,000) 23 (Design and Contingencies - $50,000) 24 (2) I-376 Access Ramp, Construction of an 25 Off-Ramp from Parkway East to 26 Pittsburgh Technology Center Site 12,000,000 27 (c) PA 19 28 (1) Gilkeson Road to Cochran Road, 29 Pavement Rehabilitation and Safety 30 Improvements 450,000 19970S0185B0697 - 2 -
1 (Base Project Allocation - $450,000) 2 (d) Fort Duquesne Boulevard 3 (1) Realignment of Fort Duquesne 4 Boulevard 8,400,000 5 (e) Liberty Avenue 6 (1) Reconstruction of Liberty Avenue 6,600,000 7 (f) North Shore Drive 8 (1) Relocation of North Shore Drive to the 9 North Side of Three Rivers Stadium Site 10 in Order to Open Access to the 11 Riverfront 8,100,000 12 (g) I-79 13 (1) Completion of the Interchange at I-79 14 and SR 0060 to Permit Easier Access to 15 Airport 10,000,000 16 (2) Design and construction of an 17 Interchange at I-79 and Parkway West to 18 Permit Easier Access to and from the 19 Airport and I-79 17,125,000 20 (Base Project Allocation - $15,000,000) 21 (Design and Contingencies - $2,125,000) 22 (3) Construct Missing Link Between I-79 23 and Parkway West 16,000,000 24 (h) US 22/30 25 (1) Reconstruction of US 22/30 Between 26 Imperial Exit and McDonald Exit 15,000,000 27 (i) SR 0028 28 (1) Widen SR 0028 Between Downtown and 29 40th Street Bridge 30,000,000 30 (2) Installation of Noise Barriers on both 19970S0185B0697 - 3 -
1 sides of SR 0028 from Highland Park 2 Bridge to Lexington Avenue in Aspinwall 3 Borough 5,000,000 4 (j) SR 0051 5 (1) Reconstruction of Intersection of SR 6 0051 and SR 0088 14,518,000 7 (k) Smithfield Street 8 (1) Reconstruction of the Smithfield 9 Street Bridge to Support Retail 10 Activity 18,000,000 11 (l) Wood Street 12 (1) Reconstruction of Wood Street to 13 Support Retail Activities 27,000,000 14 (m) Fifth and Forbes Reconstruction 15 (1) Reconstruction to Fifth and Forbes 16 Avenue Corridor to Promote Retail 17 Development 12,000,000 18 (n) Golden Triangle Intermodal Facility/LRT 19 Station 20 (1) Development of a New Intermodal 21 Facility and Transit Stop to Serve the 22 Retail Centers in Downtown 13,000,000 23 (o) North Side Intermodal Facility 24 (1) Development of a Major Commuter 25 Interceptor Intermodal Facility and 26 Transit Station on the North Side 34,420,000 27 (p) Findlay Connector 28 (1) Construction of Highway Connection 29 Between Pittsburgh International 30 Airport and Route 22 West in Order to 19970S0185B0697 - 4 -
1 Assist the Development of the Airport 2 Technology Center 100,000,000 3 (q) Cargo Interchange 4 (1) Development of State-of-the-Art Cargo 5 Interchange Facility at the Cargo 6 Terminal of the Greater Pittsburgh 7 International Airport to Support 8 Regional Business Growth in Global 9 Markets 16,000,000 10 (r) Lawrenceville Industrial Access Road 11 (1) Construction of a Highway Bypass to 12 Permit Truck and Passenger Cars Easier 13 Access into and through the 14 Lawrenceville Industrial and Commercial 15 Areas 46,800,000 16 (s) Mon-Fayette Expressway 17 (1) Construction of the Mon-Fayette 18 Expressway from Pittsburgh to Route 51 675,000,000 19 (t) Multi-Modal Corridor 20 (1) Transportation System Connecting 21 Downtown Pittsburgh with the Greater 22 Pittsburgh International Airport 363,750,000 23 (u) Tech World/Airport Transit Connection 24 (1) Creation of a Transit Connection 25 Between the Airport Technology Center 26 and the Greater Pittsburgh 27 International Airport 135,000,000 28 (v) Settlers Cabin Interchange 29 (1) Construction of a New Interchange 30 Along Parkway West in Robinson 19970S0185B0697 - 5 -
1 Township 10,750,000 2 (w) South Portal of Liberty Tubes 3 (1) Construction of a New Free-Flowing 4 Intersection to Accommodate Traffic 5 Flow 23,450,000 6 (x) Ewing Interchange 7 (1) Construction of a New Interchange 8 Along Parkway West in Moon Township 9 Adjacent to the Pittsburgh 10 International Airport 16,350,000 11 (y) West End Circle 12 (1) Purchase of a Portion of West End 13 Branch of Wheeling and Lake Erie 14 Railway Right-of-Way to Accommodate 15 West End Circle Project of PennDOT and 16 Reconstruct Railroad Interchange with 17 CSXT via the Pittsburgh Industrial 18 Railroad South of Bridgeville between 19 Milepost 57 and Milepost 61 12,800,000 20 (Land Allocation - $12,500,000) 21 (Design and Contingencies - $300,000) 22 (z) Pittsburgh Transportation Corridor 23 (1) Purchase Wheeling and Lake Erie 24 Railway Main Right-of-Way from Rook 25 Yard (Milepost 56 to Longview Milepost 26 46) to Create Two New Transportation 27 Corridors to Downtown Pittsburgh 18,400,000 28 (Land Allocation - $18,000,000) 29 (Design and Contingencies - $400,000) 30 (aa) Pittsburgh Technology Center 19970S0185B0697 - 6 -
1 (1) Construction of an Access Road between 2 Pittsburgh Technology Center and South 3 Side of LTV Site 5,000,000 4 (bb) SR 3009 5 (1) Improvement of Intersection of SR 6 3009, Baptist Road, and SR 2040, 7 Broughton Road, Bethel Park 1,200,000 8 (Base Project Allocation - $1,000,000) 9 (Land Allocation - $100,000) 10 (Design and Contingencies - $100,000) 11 (cc) SR 2040 to SR 88 12 (1) 200-Space Park'n Ride Lot 124,000 13 (Base Project Allocation - $120,000) 14 (Land Allocation - $2,000) 15 (Design and Contingencies - $2,000) 16 (dd) I-279, I-376 17 (1) Connector, City of Pittsburgh, New 18 Construction 320,000 19 (Design and Contingencies - $320,000) 20 (EE) SR 2046 <-- 21 (1) WIDEN AND REALIGN INTERSECTION OF 22 STREETS RUN ROAD AT PROSPECT ROAD IN 23 BALDWIN BOROUGH 300,000 24 (FF) SR 2120 25 (1) WIDEN INTERSECTION OF BRINTON ROAD AND 26 YOST BOULEVARD IN BRADDOCK HILLS 27 BOROUGH 75,000 28 (GG) SR 22 29 (1) REALIGN AND CORRECT SLIDE OF WILLIAM 30 PENN HIGHWAY IN CHURCHILL BOROUGH 3,000,000 19970S0185B0697 - 7 -
1 (HH) SR 837 2 (1) ADD ADDITIONAL LANES TO SR 837 IN 3 HOMESTEAD BOROUGH 50,000 4 (II) SR 2064 5 (1) REALIGN AND STABILIZE LIME HOLLOW ROAD 6 IN PENN HILLS BOROUGH 200,000 7 (JJ) SR 0791 8 (1) ADD TURNING LANE ON RODI ROAD AT 9 HOOVER ROAD IN PENN HILLS BOROUGH 500,000 10 (KK) SR 0791 11 (1) ADD TURNING LANE ON RODI ROAD AT DUFF 12 ROAD IN PENN HILLS BOROUGH 500,000 13 (LL) SR 0791 14 (1) ADD TURNING LANE ON RODI ROAD AT 15 STONELEDGE IN PENN HILLS BOROUGH 500,000 16 (MM) LAWRENCEVILLE INDUSTRIAL ACCESS ROAD 17 (1) CONSTRUCTION OF A 2-LANE, 38-MILE 18 ACCESS HIGHWAY ALONG THE ALLEGHENY 19 RIVER BETWEEN 21ST AND 62ND STREETS IN 20 THE CITY OF PITTSBURGH'S LAWRENCEVILLE 21 NEIGHBORHOOD 50,000,000 22 Section 303. Armstrong County (Reserved). 23 Section 304. Beaver County. 24 (a) SR 51 25 (1) Reconstruct and rehabilitate SR 51, 26 including hillside in City of 27 Aliquippa 25,000,000 28 (Base Project Allocation 29 - $25,000,000) 30 (b) PA 151 19970S0185B0697 - 8 -
1 (1) Hopewell Industrial Park to PA 60, 2 Hopewell Township, Reconstruction 83,000 3 (Base Project Allocation - $75,000) 4 (Design and Contingencies - $8,000) 5 Section 305. Bedford County. 6 (a) PA 56 7 (1) PA 56 Extension, Bedford Township 8 Access Road and Related Improvements 325,000 9 (Base Project Allocation - $250,000) 10 (Land Allocation - $50,000) 11 (Design and Contingencies - $25,000) 12 (b) I-99 13 (1) Bedford Borough Line North to Blair 14 County Line, Roadway Rehabilitation and 15 Safety Improvements 1,440,000 16 (Base Project Allocation - $1,320,000) 17 (Land Allocation - $60,000) 18 (Design and Contingencies - $60,000) 19 (c) Construction of Wetlands 20 (1) Construction of Numerous Five-Acre to 21 Ten-Acre Wetland Projects to Be Used 22 for Future Mitigation Purposes for 23 Highway Construction in Bedford, Blair, 24 Cambria, Fulton, Huntingdon and 25 Somerset Counties 500,000 26 (Base Project Allocation - $300,000) 27 (Land Allocation - $50,000) 28 (Design and Contingencies - $150,000) 29 (d) I-99 30 (1) Bedford and Blair Counties, US 220 19970S0185B0697 - 9 -
1 Conversion to I-99 20,000 2 (Base Project Allocation - $20,000) 3 (E) SR 4009 <-- 4 (1) IMPROVEMENTS OF INTERSECTION OF SR 5 4009, SUNNYSIDE ROAD AND SR 1001, NORTH 6 RICHARD STREET, BEDFORD BOROUGH 550,000 7 (BASE PROJECT ALLOCATION - $400,000) 8 (LAND ALLOCATION - $75,000) 9 (DESIGN AND CONTINGENCIES - $75,000) 10 Section 306. Berks County. 11 (a) I-78 12 (1) Lebanon County Line to East of 13 Frystown, Rehabilitation and Safety 14 Improvements 13,395,000 15 (Base Project Allocation - $12,500,000) 16 (Land Allocation - $45,000) 17 (Design and Contingencies - $750,000) 18 (2) Hamburg to Lehigh County, Pavement, 19 Bridge Rehabilitation and Safety 20 Improvements 26,127,000 21 (Base Project Allocation - $25,477,000) 22 (Design and Contingencies - $650,000) 23 (b) SR 0183 24 (1) Interchange with SR 0222, Widen Bridge 25 and Reconstruct Interchange 14,500,000 26 (Base Project Allocation - $7,400,000) 27 (Land Allocation - $4,600,000) 28 (Design and Contingencies - $2,500,000) 29 (2) Intersection with SR 3055, Widen 30 Bridge and Reconstruct Interchange 5,000,000 19970S0185B0697 - 10 -
1 (Base Project Allocation - $3,500,000) 2 (Land Allocation - $750,000) 3 (Design and Contingencies - $750,000) 4 (c) US 222 5 (1) Reconstruct US 222 as a Four-Lane 6 Limited Access Highway Between SR 3028 7 (Warren Street Extension) in Cumru 8 Township and the Existing US 222 9 Expressway in Lancaster County 90,200,000 10 (Base Project Allocation - $66,000,000) 11 (Land Allocation - $17,200,000) 12 (Design and Contingencies - $7,000,000) 13 (2) Intersection with SR 0073, 14 Intersection Improvements 903,000 15 (Base Project Allocation - $628,000) 16 (Land Allocation - $175,000) 17 (Design and Contingencies - $100,000) 18 (3) Intersection with SR 0662, 19 Intersection Improvements 551,000 20 (Base Project Allocation - $445,000) 21 (Land Allocation - $51,000) 22 (Design and Contingencies - $55,000) 23 (d) SR 0061 24 (1) SR 3055 to Schuylkill County Line, Add 25 Lanes, Resurface and Shoulder 26 Construction 20,000,000 27 (2) SR 3055 to US 222, Widen Highway, 28 Abolish Existing Railroad Overpass and 29 Construct New Overpass 20,000,000 30 (e) SR 2033 19970S0185B0697 - 11 -
1 (1) Shelbourne Road TR 422 and TR 562, 2 Realignment 6,525,000 3 (Base Project Allocation - $5,375,000) 4 (Land Allocation - $400,000) 5 (Design and Contingencies - $750,000) 6 (f) SR 3055 7 (1) Outer Bypass Rehabilitation, SR 0061 8 to the End of Expressway, 9 Rehabilitation 4,400,000 10 (Base Project Allocation - $2,400,000) 11 (Land Allocation - $1,000,000) 12 (Design and Contingencies - $1,000,000) 13 (g) SR 0737 14 (1) Widen and Reconstruct Between SR 0222 15 and I-78 3,000,000 16 (h) Warren Street Extension 17 (1) Construct a New Four-Lane Limited 18 Access Highway Connecting US 422 in the 19 Borough of Wyomissing to US 222 in 20 Cumru Township. The Proposed Highway 21 would have Interchanges with US 422, PA 22 724 and US 222 72,500,000 23 (Base Project Allocation - $45,500,000) 24 (Land Allocation - $18,800,000) 25 (Design and Contingencies - $8,200,000) 26 (i) SR 422 27 (1) Intersection with TR 662, Douglass 28 Township, Relocation and Reconstruction 29 of Intersection 5,000,000 30 (J) KUTZTOWN UNIVERSITY <-- 19970S0185B0697 - 12 -
1 (1) CONSTRUCTION OF NEW ACCESS ROAD TO 2 KUTZTOWN UNIVERSITY AND RELOCATION OF 3 STATE ROAD 2,760,000 4 Section 307. Blair County. 5 (a) I-99 6 (1) Bedford County Line North to the 7 Village of Bald Eagle, Roadway 8 Rehabilitation and Safety Improvements 1,440,000 9 (Base Project Allocation - $1,320,000) 10 (Land Allocation - $60,000) 11 (Design and Contingencies - $60,000) 12 (2) Construction of New Interchange with 13 US 220 at Kettle Street to Juniata Gap 14 Road at Chestnut Avenue 90,000,000 15 (Base Project Allocation - $79,000,000) 16 (Land Allocation - $1,000,000) 17 (Design and Contingencies - 18 $10,000,000) 19 (b) SR 4027 20 (1) Reconstruction and/or Relocation in 21 Tyrone Borough and Snyder Township 3,200,000 22 (Base Project Allocation - $2,500,000) 23 (Land Allocation - $200,000) 24 (Design and Contingencies - $500,000) 25 (c) SR 4008 26 (1) Reconstruction of Horseshoe Curve Road 27 from 40th Street and Board Avenue to US 28 22 at Gallitzin Interchange in Cambria 29 County 4,901,000 30 (Base Project Allocation - $4,198,000) 19970S0185B0697 - 13 -
1 (Land Allocation - $350,000) 2 (Design and Contingencies - $353,000) 3 (d) Chestnut Avenue Extension 4 (1) Complete Construction of Chestnut 5 Avenue Extension 27,000,000 6 (Base Project Allocation - $17,000,000) 7 (Land Allocation - $5,000,000) 8 (Design and Contingencies - $5,000,000) 9 Section 308. Bradford County. 10 (a) SR 14 11 (1) Canton Township, Intersection of PA 14 12 and SR 3012, Village of Grover, 0.5 13 Mile Reconstruction, Improve Horizontal 14 Alignment and Intersection 2,100,000 15 (Base Project Allocation - $1,800,000) 16 (Land Allocation - $100,000) 17 (Design and Contingencies - $200,000) 18 Section 309. Bucks County. 19 (a) I-95 20 (1) Philadelphia County to New Jersey 21 State Line, Pavement Rehabilitation and 22 Safety Improvements 1,900,000 23 (Base Project Allocation - $1,700,000) 24 (Land Allocation - $10,000) 25 (Design and Contingencies - $190,000) 26 (b) SR 309 27 (1) County Line Road, Hilltown Township to 28 Bethlehem Road, West Rockhill Township, 29 Pavement Rehabilitation, Shoulders and 30 Safety Improvements 2,000,000 19970S0185B0697 - 14 -
1 (Base Project Allocation - $1,500,000) 2 (Land Allocation - $150,000) 3 (Design and Contingencies - $350,000) 4 (c) SR 313 5 (1) New Galena Road, New Britain Township 6 to Stump Road, New Britain Township, 7 Install Truck Climbing Lane in 8 Westbound Direction 750,000 9 (Base Project Allocation - $500,000) 10 (Land Allocation - $150,000) 11 (Design and Contingencies - $100,000) 12 (d) SR 332 13 (1) Newtown and Lower Makefield Townships, 14 at Lindenhurst Road, SR 2069, Widening, 15 Intersection Improvements and Highway 16 Restoration 1,000,000 17 (Base Project Allocation - $1,000,000) 18 Section 310. Butler County. 19 (a) US 422 20 (1) Intersection Improvements and 21 Installation of New Traffic Signals at 22 Intersection of US 422, SR 0038 and SR 23 0068 8,000,000 24 (2) Restoration of US 422 in Muddycreek 25 and Franklin Townships 10,100,000 26 (Base Project Allocation - $10,000,000) 27 (Design and Contingencies - $100,000) 28 (b) Hansen Avenue 29 (1) Installation of New Traffic Signals at 30 Hansen Avenue in Butler Township 160,000 19970S0185B0697 - 15 -
1 (c) SR 0068 2 (1) Installation of Traffic Signals at 3 Intersection with Whitestown Road 50,000 4 (2) Installation of Traffic Signals at 5 Intersection with Stevenson Road 50,000 6 (d) SR 0356 7 (1) Widen SR 0356 from Silverville Road to 8 Riemer Road 5,000,000 9 (e) SR 0228 10 (1) Installation of Traffic Signals at 11 Intersection with South Pike Road 200,000 12 (2) Restoration, Reconstruction and 13 Widening of SR 228 from SR 3015 to SR 8 14 South 9,700,000 15 (Base Project Allocation - $8,000,000) 16 (Land Allocation - $1,000,000) 17 (Design and Contingencies - $700,000) 18 (3) Restoration, Reconstruction and 19 Widening of SR 228 from SR 8 South to 20 SR 356 21,500,000 21 (Base Project Allocation - $18,000,000) 22 (Land Allocation - $2,000,000) 23 (Design and Contingencies - $1,500,000) 24 (f) South Pike Road 25 (1) Installation of Traffic Signals at 26 Intersection with Monroe Road 200,000 27 (g) SR 528 28 (1) Reconstruction of Existing Interchange 29 in Jackson Township 1,900,000 30 (Base Project Allocation - $1,400,000) 19970S0185B0697 - 16 -
1 (Land Allocation - $200,000) 2 (Design and Contingencies - $300,000) 3 (h) SR 3025 4 (1) Reconstruction of Existing Interchange 5 in Jackson Township 4,100,000 6 (Base Project Allocation - $3,500,000) 7 (Land Allocation - $300,000) 8 (Design and Contingencies - $300,000) 9 (i) SR 8 10 (1) Restoration and Reconstruction of SR 8 11 South in City of Butler and Butler, 12 Penn and Middlesex Townships 16,700,000 13 (Base Project Allocation - $15,000,000) 14 (Land Allocation - $1,000,000) 15 (Design and Contingencies - $700,000) 16 Section 311. Cambria County. 17 (a) US 219 18 (1) Scalp Avenue to Davidsville, Pavement 19 Restoration 1,392,000 20 (Base Project Allocation - $1,312,000) 21 (Design and Contingencies - $80,000) 22 (b) SR 4021 23 (1) Construct Access Road from SR 4021 to 24 Hastings Area Industrial Park 1,300,000 25 (c) PA 56 26 (1) Haws Pike, Lower Yoder Township 27 Roadway Rehabilitation and Safety 28 Improvements 400,000 29 (Base Project Allocation - $380,000) 30 (Design and Contingencies - $20,000) 19970S0185B0697 - 17 -
1 Section 312. Cameron County (Reserved). 2 Section 313. Carbon County. 3 (a) I-80 4 (1) Harmony Lake to Monroe County, 5 Pavement Rehabilitation and Safety 6 Improvements 200,000 7 (Base Project Allocation - $179,000) 8 (Land Allocation - $1,000) 9 (Design and Contingencies - $20,000) 10 (2) RECONSTRUCTION OF REST AREA ON <-- 11 WESTBOUND I-80 IN KIDDER TOWNSHIP 4,950,000 12 (BASE PROJECT ALLOCATION - $2,700,000) 13 (LAND ALLOCATION - $1,000,000) 14 (DESIGN AND CONTINGENCIES - $1,250,000) 15 (3) CONSTRUCT NEW WEIGH STATION AT REST 16 AREA ON WESTBOUND I-80 IN KIDDER 17 TOWNSHIP 330,000 18 (BASE PROJECT ALLOCATION - $300,000) 19 (DESIGN AND CONTINGENCIES - $30,000) 20 (B) SR 248 21 (1) REHABILITATION AND RESTORATION OF SR 22 248 FROM US 209 TO PALMERTON BOROUGH 1,900,000 23 (BASE PROJECT ALLOCATION - $1,900,000) 24 (2) REHABILITATION AND RESTORATION OF SR 25 248 FROM SR 895 TO NORTHAMPTON COUNTY 26 LINE 2,300,000 27 (BASE PROJECT ALLOCATION - $2,200,000) 28 (LAND ALLOCATION - $50,000) 29 (DESIGN AND CONTINGENCIES - $50,000) 30 (C) SR 2006 19970S0185B0697 - 18 -
1 (1) INTERSECTION IMPROVEMENTS AT 2 INTERSECTION OF SR 2006 AND SR 2002 IN 3 LOWER TOWAMENSING TOWNSHIP 1,150,000 4 (BASE PROJECT ALLOCATION - $850,000) 5 (LAND ALLOCATION - $150,000) 6 (DESIGN AND CONTINGENCIES - $150,000) 7 (D) SR 2015 8 (1) RESTORATION OF SR 2015 IN BOROUGH OF 9 WEISSPORT 800,000 10 (BASE PROJECT ALLOCATION - $400,000) 11 (LAND ALLOCATION - $100,000) 12 (DESIGN AND CONTINGENCIES - $300,000) 13 Section 314. Centre County. 14 (a) I-80 15 (1) Clearfield County Line to Clinton 16 County, Pavement Rehabilitation and 17 Safety Improvements 3,300,000 18 (Base Project Allocation - $2,953,000) 19 (Land Allocation - $17,000) 20 (Design and Contingencies - $330,000) 21 (2) Marion Township, Exit 24, Interchange 22 Reconstruction 1,560,000 23 (Base Project Allocation - $1,500,000) 24 (Design and Contingencies - $60,000) 25 (3) Boggs Township, Exit 23, Interchange 26 Reconstruction 1,160,000 27 (Base Project Allocation - $1,100,000) 28 (Design and Contingencies - $60,000) 29 (b) PA 504 30 (1) Phillipsburg Borough and Rush 19970S0185B0697 - 19 -
1 Township, Cold Stream Run Bridge to 2 Airport, Two-Lane Reconstruction 400,000 3 (Base Project Allocation - $240,000) 4 (Land Allocation - $60,000) 5 (Design and Contingencies - $100,000) 6 (c) PA 350 7 (1) Climbing Lane and Two-Lane Relocation, 8 North of Bald Eagle to Top of Sandy 9 Ridge Mountain 5,750,000 10 (Base Project Allocation - $5,200,000) 11 (Land Allocation - $150,000) 12 (Design and Contingencies - $400,000) 13 Section 315. Chester County. 14 (a) SR 41 15 (1) Relocation of SR 41 in Southern 16 Chester County 10,000,000 17 (Design and Contingencies - 18 $10,000,000) 19 (2) Upgrade Intersection of SR 41 and SR 20 796 in Londonderry Township 665,000 21 (Base Project Allocation - $600,000) 22 (Land Allocation - $15,000) 23 (Design and Contingencies - $50,000) 24 (3) Upgrade Intersection of SR 41 and Zook 25 Road in West Sadsbury Township 665,000 26 (Base Project Allocation - $600,000) 27 (Land Allocation - $15,000) 28 (Design and Contingencies - $50,000) 29 (b) US 1 30 (1) East Marlborough Township, 19970S0185B0697 - 20 -
1 Transportation Partnership Overpass 3,000,000 2 (Base Project Allocation - $2,500,000) 3 (Land Allocation - $200,000) 4 (Design and Contingencies - $300,000) 5 (c) SR 926 6 (1) Resurface, Widen, Install New Drainage 7 and Improve Intersection Visibility 8 from Route 352 to Route 202 675,000 9 (Base Project Allocation - $325,000) 10 (Land Allocation - $125,000) 11 (Design and Contingencies - $225,000) 12 (d) US 202 13 (1) Signalization of Southbound US 202 14 Off-Ramp at Intersection with Paoli 15 Pike, West Goshen Township 335,000 16 (Base Project Allocation - $250,000) 17 (Design and Contingencies - $85,000) 18 (2) Engineering study of the capacity and 19 potential safety improvements to the 20 ramps, structures and roadway of US 202 21 between US 30 and Swedesford Road 22 interchange in East Whiteland 1,500,000 23 (Design and Contingencies - $1,500,000) 24 (e) Paoli Pike 25 (1) Install New Storm Water Drainage 26 System at Two Locations on Paoli Pike 27 in Willistown Township 482,000 28 (Base Project Allocation - $450,000) 29 (Design and Contingencies - $32,000) 30 (f) US 30 19970S0185B0697 - 21 -
1 (1) US 30, Coatesville-Downingtown Bypass, 2 Preliminary Engineering Analysis for 3 Update from SR 10 West of Coatesville 4 to Exton Bypass 1,000,000 5 Section 316. Clarion County (Reserved). 6 Section 317. Clearfield County. 7 (a) I-80 8 (1) Jefferson County Line to Centre County 9 Line, Pavement Rehabilitation and 10 Safety Improvements 4,100,000 11 (Base Project Allocation - $3,670,000) 12 (Land Allocation - $20,000) 13 (Design and Contingencies - $410,000) 14 (b) US 219 15 (1) SR 219 and SR 4019, South of Dubois, 16 Add Two-Way Left Turn Lane 188,000 17 (Base Project Allocation - $138,000) 18 (Land Allocation - $30,000) 19 (Design and Contingencies - $20,000) 20 Section 318. Clinton County. 21 (a) I-80 22 (1) Centre County Line to Union County 23 Line, Pavement Rehabilitation and 24 Safety Improvements 2,400,000 25 (Base Project Allocation - $2,148,000) 26 (Land Allocation - $12,000) 27 (Design and Contingencies - $240,000) 28 Section 319. Columbia County. 29 (a) PA 54 30 (1) PA 54/61 and PA 42, Village of 19970S0185B0697 - 22 -
1 Centralia, Restoration 150,000 2 (Base Project Allocation - $120,000) 3 (Land Allocation - $6,000) 4 (Design and Contingencies - $24,000) 5 (b) PA 487 6 (1) Knoebels Access Road, Franklin 7 Township, Intersection and Access 8 Improvements 300,000 9 (Base Project Allocation - $180,000) 10 (Land Allocation - $20,000) 11 (Design and Contingencies - $100,000) 12 Section 320. Crawford County. 13 (a) I-79 14 (1) Northbound and Southbound Rest Areas 15 (Sites 19 and 20), Sewage Treatment 16 Plant Improvements, Length 0.5 Mile 1,150,000 17 (Base Project Allocation - $1,000,000) 18 (Design and Contingencies - $150,000) 19 (b) SR 8 20 (1) Intersection Improvements at SR 8 and 21 SR 27 to Provide Additional Truck 22 Turning Radii 205,000 23 (Base Project Allocation - $160,000) 24 (Land Allocation - $10,000) 25 (Design and Contingencies - $35,000) 26 (c) SR 27 27 (1) Install New Signals at Intersections 28 within City of Meadville 275,000 29 (Base Project Allocation - $225,000) 30 (Land Allocation - $20,000) 19970S0185B0697 - 23 -
1 (Design and Contingencies - $30,000) 2 (2) Various Corridor and Spot Improvements 3 on SR 27 between Meadville and 4 Titusville 7,000,000 5 (Base Construction Allocation - 6 $6,000,000) 7 (Land Allocation - $400,000) 8 (Design and Contingencies - $600,000) 9 (d) SR 77 10 (1) Various Corridor and Spot Improvements 11 on SR 77, SR 408 and SR 1010 between 12 Meadville and Titusville 7,000,000 13 (Base Construction Allocation - $ 14 6,000,000) 15 (Land Allocation - $400,000) 16 (Design and Contingencies - $600,000) 17 Section 321. Cumberland County. 18 (a) I-81 19 (1) Exit 12, Interchange with PA 465, 20 Interchange Improvements 1,520,000 21 (Base Construction Allocation - 22 $1,200,000) 23 (Land Allocation - $20,000) 24 (Design and Contingencies - $300,000) 25 Section 322. Dauphin County. 26 (a) I-283 27 (1) PA 441 to I-76, Pavement 28 Rehabilitation and Safety Improvements 200,000 29 (Base Project Allocation - $179,000) 30 (Land Allocation - $1,000) 19970S0185B0697 - 24 -
1 (Design and Contingencies - $20,000) 2 (b) PA 283 3 (1) I-283 to PA 341, Pavement 4 Rehabilitation and Safety Improvements 6,962,000 5 (Base Project Allocation - $6,500,000) 6 (Land Allocation - $2,000) 7 (Design and Contingencies - $460,000) 8 (c) US 22 9 (1) Construction of Pedestrian Tunnel or 10 Overhead Crossing of US 22 near Manor 11 Drive in West Hanover Township 3,250,000 12 (Base Project Allocation - $3,000,000) 13 (Land Allocation - $100,000) 14 (Design and Contingencies - $150,000) 15 (d) Pleasant View Road 16 (1) Install New Signals and Reconstruct 17 Highway-Railroad Grade Crossing on 18 Pleasant View Road, South Hanover 19 Township 190,000 20 (Base Project Allocation - $150,000) 21 (Land Allocation - $20,000) 22 (Design and Contingencies - $20,000) 23 (e) I-81 24 (1) Installation of sound barriers on 25 north and south sides of I-81 from 26 intersection with I-83 to Mountain Road 27 Interchange 5,300,000 28 (Base Project Allocation - $5,000,000) 29 (Design and Contingencies - $300,000) 30 (f) PA 225 19970S0185B0697 - 25 -
1 (1) Briardale Road to PA 325, Middle 2 Paxton Township, Resurfacing 116,000 3 (Base Project Allocation - $116,000) 4 (g) PA 225 5 (1) South Road to Briardale Road, Middle 6 Paxton Township, Widen to Three Lanes 111,000 7 (Base Project Allocation - $111,000) 8 Section 323. Delaware County. 9 (a) US 30 10 (1) Ithan Avenue, Villanova University, 11 Pedestrian Tunnel and Turn Lanes 600,000 12 (Base Project Allocation - $600,000) 13 (b) I-95 14 (1) Install Sound Barriers on I-95 on East 15 Side from SR 420 to SR 291 2,100,000 16 (Base Project Allocation - $2,000,000) 17 (Design and Contingencies - $100,000) 18 (c) P & W Bike/Pedestrian Trail 19 (1) Radnor Township, Bikeway 140,000 20 (Base Project Allocation - $112,000) 21 (Design and Contingencies - $28,000) 22 Section 324. Elk County. 23 (a) Osterhout Street 24 (1) From SR 120 Intersection to SR 219 25 Intersection, Reconstruct to 24 Feet 3,585,000 26 (Base Project Allocation - $2,500,000) 27 (Land Allocation - $600,000) 28 (Design and Contingencies - $485,000) 29 (b) Elk County Industrial Park Access Road 30 (1) SR 120, SR 255, SR 1001, SR 1002, SR 19970S0185B0697 - 26 -
1 1003 and SR 1008, Reconstruct to 24 2 Feet 2,882,000 3 (Base Project Allocation - $2,632,000) 4 (Land Allocation - $100,000) 5 (Design and Contingencies - $150,000) 6 (c) US 219 7 (1) Relocation of Allegheny & Eastern 8 Track to Allow for the Construction of 9 a US 219 Bypass of Johnsonburg 5,100,000 10 (Base Construction Allocation - 11 $3,900,000) 12 (Land Allocation - $1,000,000) 13 (Design and Contingencies - $200,000) 14 Section 325. Erie County. 15 (a) SR 4024 16 (1) SR 4024 Extension, US 19 to Bush 17 Industrial Road, Summit Township, 18 Construct New Roadway and Intersection 19 Improvements 620,000 20 (Base Project Allocation - $400,000) 21 (Land Allocation - $120,000) 22 (Design and Contingencies - $100,000) 23 (b) I-79 24 (1) Crawford County Line to I-90 in Erie 25 County, Pavement Rehabilitation and 26 Safety Improvements 1,900,000 27 (Base Project Allocation - $1,700,000) 28 (Land Allocation - $10,000) 29 (Design and Contingencies - $190,000) 30 (c) SR 3006 19970S0185B0697 - 27 -
1 (1) From Bridge to Erie Street, Borough of 2 Edinboro, Add Turn Lanes 64,000 3 (Base Project Allocation - $44,000) 4 (Land Allocation - $10,000) 5 (Design and Contingencies - $10,000) 6 (d) SR 4034 7 (1) City of Erie, East Side Access, Port 8 Access Road to East 6th Street, new 9 two-lane roadway 1,176,000 10 (Base Project Allocation - $647,000) 11 (Land Allocation - $329,000) 12 (Design and Contingencies - $200,000) 13 (2) City of Erie, East Side Access, East 14 6th Street to East 12th Street, new 15 two-lane roadway 830,000 16 (Base Project Allocation - $30,000) 17 (Land Allocation - $440,000) 18 (Design and Contingencies - $360,000) 19 (3) City of Erie, East Side Access, Port 20 Access Road, Larson Text Right-of-Way 21 Acquisition 200,000 22 (Land Allocation - $200,000) 23 (e) SR 4016 24 (1) West 38th Street, Shunpike Road to 25 Myrtle Street, Realignment/Relocation 940,000 26 (Base Project Allocation - $800,000) 27 (Land Allocation - $50,000) 28 (Design and Contingencies - $90,000) 29 (f) SR 0299 30 (1) Millcreek Township, Powell Avenue 19970S0185B0697 - 28 -
1 Relocation 6,300,000 2 (Base Project Allocation - $4,700,000) 3 (Land Allocation - $600,000) 4 (Design and Contingencies - $1,000,000) 5 (g) SR 4024 6 (1) Summit Township, Robinson Road 7 Extensions 11,300,000 8 (Base Project Allocation - $9,800,000) 9 (Land Allocation - $700,000) 10 (Design and Contingencies - $800,000) 11 (h) SR 4026 12 (1) Millcreek Township, South Hill Road 13 Extensions 6,200,000 14 (Base Project Allocation - $4,800,000) 15 (Land Allocation - $750,000) 16 (Design and Contingencies - $650,000) 17 Section 326. Fayette County. 18 (a) SR 21 19 (1) SR 21 from Uniontown to Masontown, 20 Safety Improvements 2,000,000 21 (Design and Contingencies - $2,000,000) 22 (b) SR 711 23 (1) SR 711 in Connellsville, Safety 24 Improvements 400,000 25 (Design and Contingencies - $400,000) 26 Section 327. Forest County. 27 (a) SR 666 28 (1) Beaver Run Bridge to Whig Hill 29 Highway, Restoration 980,000 30 (Base Project Allocation - $800,000) 19970S0185B0697 - 29 -
1 (Land Allocation - $30,000) 2 (Design and Contingencies - $150,000) 3 (2) Whig Hill to Little Minister Run 4 Bridge, Restoration 1,380,000 5 (Base Project Allocation - $1,200,000) 6 (Land Allocation - $30,000) 7 (Design and Contingencies - $150,000) 8 (3) East of Upper Sheriff Creek to West of 9 Porcupine Run Bridge, Restoration 2,230,000 10 (Base Project Allocation - $2,000,000) 11 (Land Allocation - $30,000) 12 (Design and Contingencies - $200,000) 13 (4) West of Porcupine Run Bridge to Bobbs 14 Creek Bridge, Restoration 1,530,000 15 (Base Project Allocation - $1,300,000) 16 (Land Allocation - $30,000) 17 (Design and Contingencies - $200,000) 18 (5) Bobbs Creek Bridge to Little Minister 19 Run Bridge, Restoration 1,230,000 20 (Base Project Allocation - $1,000,000) 21 (Land Allocation - $30,000) 22 (Design and Contingencies - $200,000) 23 (6) Village of Lynch to Village of Whig 24 Hill, Howe and Kingsley Townships, 25 Reconstruction 16,500,000 26 (Base Project Allocation - $14,000,000) 27 (Land Allocation - $1,000,000) 28 (Design and Contingencies - $1,500,000) 29 Section 328. Franklin County (Reserved). 30 Section 329. Fulton County. 19970S0185B0697 - 30 -
1 (a) I-70 2 (1) Warfordsburg to Deneen Gap, 3 Rehabilitation and Safety Improvements 637,000 4 (Base Project Allocation - $607,000) 5 (Design and Contingencies - $30,000) 6 (B) SR 1001 <-- 7 (1) RECONSTRUCTION OF INTERSECTION OF SR 8 0016 AND SR 1001 AND CITO ROAD BETWEEN 9 INTERSECTION AND A POINT ONE MILE SOUTH 10 OF INTERSECTION 2,000,000 11 (BASE PROJECT ALLOCATION - $1,600,000) 12 (LAND ALLOCATION - $100,000) 13 (DESIGN AND CONTINGENCIES - $300,000) 14 Section 330. Greene County. 15 (a) I-79 16 (1) 1 Mile North of Kirby to 3 Miles South 17 of Waynesburg, Whiteley Township, 18 Resurfacing 360,000 19 (Base Project Allocation - $340,000) 20 (Design and Contingencies - $20,000) 21 (b) I-79 22 (1) 3 Miles South of Waynesburg to 23 Waynesburg, Franklin Township, 24 Resurfacing 500,000 25 (Base Project Allocation - $440,000) 26 (Design and Contingencies - $60,000) 27 Section 331. Huntingdon County. 28 (a) SR 26 29 (1) Huntingdon Borough and Oneida, Miller, 30 Jackson and Barree Townships, Isolated 19970S0185B0697 - 31 -
1 Improvements along 22 Miles of SR 26, 2 Including Reconstruction and Widening 3 of Pavement, Realignment, Intersection 4 Improvements and Truck Climbing Lanes, 5 to Upgrade Highway to Current 6 Standards 25,500,000 7 (Base Project Allocation - $20,500,000) 8 (Land Allocation - $2,000,000) 9 (Design and Contingencies - $3,000,000) 10 (2) Reconstruction and Corridor 11 Improvements from Huntingdon Borough to 12 Centre County Line 25,000,000 13 (Base Project Allocation - $20,500,000) 14 (Land Allocation - $2,000,000) 15 (Design and Contingencies - $2,500,000) 16 (b) SR 944 17 (1) Engineering and Land Acquisition from 18 Intersection of SR 944 to Village of 19 Cooks 600,000 20 (Land Allocation - $100,000) 21 (Design and Contingencies - $500,000) 22 Section 332. Indiana County (Reserved). 23 Section 333. Jefferson County. 24 (a) I-80 25 (1) Milepost 91 to Clearfield County Line, 26 Pavement Rehabilitation and Safety 27 Improvements 500,000 28 (Base Project Allocation - $447,000) 29 (Land Allocation - $3,000) 30 (Design and Contingencies - $50,000) 19970S0185B0697 - 32 -
1 (2) Exit 15, Railroad Overpass to 2 Westbound Roadside Rest, Interstate 3 Preventative Maintenance 3,580,000 4 (Base Project Allocation - $3,500,000) 5 (Design and Contingencies - $80,000) 6 Section 334. Juniata County (Reserved). 7 Section 335. Lackawanna County. 8 (a) I-81 9 (1) Various routes in Lackawanna and 10 Luzerne Counties, in the Vicinity of 11 Scranton and Wilkes-Barre, Intelligent 12 Transportation Systems Study 80,000 13 (Design and Contingencies - $80,000) 14 (2) Luzerne County Line to Susquehanna 15 County Line, Pavement Rehabilitation 16 and Safety Improvements 2,700,000 17 (Base Project Allocation - $2,416,000) 18 (Land Allocation - $14,000) 19 (Design and Contingencies - $270,000) 20 (3) Reconstruction of I-81 and Davis 21 Street Interchange to Increase Length 22 of Entrance and Exit Ramps 5,000,000 23 (Base Project Allocation - $4,600,000) 24 (Land Allocation - $300,000) 25 (Design and Contingencies - $100,000) 26 (b) I-84 27 (1) I-81 to Wayne County Line, Pavement 28 Rehabilitation and Safety Improvements 1,200,000 29 (Base Project Allocation - $1,074,000) 30 (Land Allocation - $6,000) 19970S0185B0697 - 33 -
1 (Design and Contingencies - $120,000) 2 (c) I-380 3 (1) I-84 to Monroe County Line, Pavement 4 Rehabilitation and Safety Improvements 1,000,000 5 (Base Project Allocation - $895,000) 6 (Land Allocation - $5,000) 7 (Design and Contingencies - $100,000) 8 (d) US 6 and US 11 9 (1) Construction of Clarks Summit Bypass 25,000,000 10 (Base Project Allocation - $24,000,000) 11 (Design and Contingencies - 1,000,000) 12 (2) Construction of Turning Lanes in South 13 Abington Township 1,100,000 14 (Base Project Allocation - $1,000,000) 15 (Design and Contingencies - $100,000) 16 (e) SR 632 17 (1) Reconstruction and Drainage 18 Improvements, South Abington Township 350,000 19 (Base Project Allocation - $300,000) 20 (Design and Contingencies - $50,000) 21 (f) Shady Lane Road 22 (1) Widen Railroad Tunnel 2,000,000 23 (Base Project Allocation - $1,800,000) 24 (Design and Contingencies - $200,000) 25 (g) Keyser - Milwaukee Road 26 (1) Reconstruction of Road from Main 27 Street to Oak Street 250,000 28 (Base Project Allocation - $225,000) 29 (Design and Contingencies - $25,000) 30 Section 336. Lancaster County. 19970S0185B0697 - 34 -
1 (a) PA 23 2 (1) US 30 to Berks County Line, Pavement 3 Rehabilitation and Safety Improvements 2,200,000 4 (Base Project Allocation - $2,000,000) 5 (Design and Contingencies - $200,000) 6 (2) FOUR LANE RELOCATION ENVIRONMENTAL <-- 7 IMPACT STUDY 1,000,000 8 (DESIGN AND CONTINGENCIES - $1,000,000) 9 (3) US 30 TO BERKS COUNTY LINE, FOUR LANE 10 RELOCATION OF PA 23 60,000,000 11 (4) ENVIRONMENTAL IMPACT STUDY 1,000,000 12 (b) PA 322 13 (1) Farmersville Road to PA 897, Pavement 14 Rehabilitation, Widen Shoulder and 15 Safety Improvements 1,320,000 16 (Base Project Allocation - $1,200,000) 17 (Design and Contingencies - $120,000) 18 (c) PA 372 19 (1) Oak Bottom Road to Germantown Avenue, 20 Pavement Rehabilitation and Safety 21 Improvements 2,200,000 22 (Base Project Allocation - $2,000,000) 23 (Design and Contingencies - $200,000) 24 (d) PA 896 25 (1) US 30 to Strasburg Borough, Pavement 26 Rehabilitation, Widen Shoulder and 27 Safety Improvements 1,980,000 28 (Base Project Allocation - $1,800,000) 29 (Design and Contingencies - $180,000) 30 (2) Strasburg Borough to PA 372, Valley 19970S0185B0697 - 35 -
1 Road, Pavement Rehabilitation and 2 Safety Improvements 2,338,000 3 (Base Project Allocation - $2,126,000) 4 (Design and Contingencies - $212,000) 5 (e) PA 897 6 (1) Amish Road to Adamstown Road, Pavement 7 Rehabilitation and Safety Improvements 3,850,000 8 (Base Project Allocation - $3,500,000) 9 (Design and Contingencies - $350,000) 10 (f) US 30 11 (1) US 222 to PA 340 3,000,000 12 (Design and Contingencies - $3,000,000) 13 (2) PA 741 to PA 72 3,000,000 14 (Design and Contingencies - $3,000,000) 15 (3) PA 896 to PA 897 3,000,000 16 (Design and Contingencies - $3,000,000) 17 (4) PA 896 to PA 41, Environmental Impact 18 Study 1,000,000 19 (Design and Contingencies - $1,000,000) 20 (5) WIDEN TO FIVE LANES BETWEEN PA 896 TO <-- 21 PA 41 10,000,000 22 (6) INTERSECTION IMPROVEMENTS ON PARALLEL 23 ROADS TO ALLEVIATE CONGESTION PRIOR TO 24 AND DURING RECONSTRUCTION 1,000,000 25 (g) SR 2015 26 (1) Strasburg Borough to PA 372, Pavement 27 Rehabilitation and Safety Improvements 2,860,000 28 (Base Project Allocation - $2,600,000) 29 (Design and Contingencies - $260,000) 30 (h) SR 2040 19970S0185B0697 - 36 -
1 (1) Paradise Lane to PA 741, Pavement 2 Rehabilitation and Safety Improvements 671,000 3 (Base Project Allocation - $610,000) 4 (Design and Contingencies - $61,000) 5 (i) SR 3017 6 (1) PA 462 to Harrisburg Pike, Pavement 7 Rehabilitation and Safety Improvements 7,700,000 8 (Base Project Allocation - $7,000,000) 9 (Design and Contingencies - $700,000) 10 (j) PA 41 11 (1) PA 926 to US 30, Major Investment 12 Study 500,000 13 (Design and Contingencies - $500,000) 14 (K) PA 72/PA 501 CORRIDOR <-- 15 (1) CONSTRUCTION OF MANHEIM RELIEF ROUTE 3,400,000 16 (2) CONSTRUCTION OF EAST PETERSBURG RELIEF 17 ROUTE 2,400,000 18 (3) WIDEN PA 72 FROM PA 283 TO MILLER 19 ROAD 4,000,000 20 (L) AIRPORT ROAD 21 (1) RELOCATE AND REALIGN AIRPORT ROAD IN 22 MANHEIM TOWNSHIP 300,000 23 Section 337. Lawrence County (Reserved). 24 Section 338. Lebanon County. 25 (a) I-81 26 (1) I-78 to Schuylkill County Line, 27 Pavement Rehabilitation and Safety 28 Improvements 1,500,000 29 (Base Project Allocation - $1,342,000) 30 (Land Allocation - $8,000) 19970S0185B0697 - 37 -
1 (Design and Contingencies - $150,000) 2 (b) US 322 3 (1) PA 934/241 to PA 419, Intersection 4 Improvements 456,000 5 (Base Project Allocation - $410,000) 6 (Land Allocation - $28,000) 7 (Design and Contingencies - $18,000) 8 (c) SR 0897 9 (1) From SR 0501 West and Southwest beyond 10 intersection with SR 0419, Heidelberg 11 Township, reconstruct roadway 12,000,000 12 (Base Construction Allocation - 13 $12,000,000) 14 (d) I-78 15 (1) Construction of complete interchange 16 at intersection of I-78 and SR 343 in 17 Bethel Township 12,000,000 18 (Base Construction Allocation - 19 $8,000,000) 20 (Land Allocation - $2,000,000) 21 (Design and Contingencies - $2,000,000) 22 (e) SR 501 23 (1) Construction of bypass of SR 501 on 24 the west side of Schafferstown from 25 Main Street to vicinity of Michter's 26 Road, Heidelberg Township 8,000,000 27 (Base Construction Allocation - 28 $6,000,000) 29 (Land Allocation - $1,000,000) 30 (Design and Contingencies - $1,000,000) 19970S0185B0697 - 38 -
1 Section 339. Lehigh County. 2 (a) SR 1017 and SR 1008 3 (1) Reconstruct and Improve Mauch Chunk 4 Road, Schadt Avenue and Rural Road in 5 Whitehall Township 1,073,000 6 (Base Project Allocation - $774,000) 7 (Land Allocation - $120,000) 8 (Design and Contingencies - $179,000) 9 (b) SR 3017 10 (1) Widening to four lanes from Industrial 11 Drive to City Line Road, Hanover 12 Township 2,462,000 13 (Base Project Allocation - $1,610,000) 14 (Land Allocation - $572,000) 15 (Design and Contingencies - $280,000) 16 (2) Widening to four lanes from City Line 17 Road to Race Street Extension, Hanover 18 Township 2,720,000 19 (Base Project Allocation - $2,036,000) 20 (Land Allocation - $404,000) 21 (Design and Contingencies - $280,000) 22 (c) SR 1004 23 (1) Extend four lanes from SR 0987 to SR 24 3017, Catasauqua Borough 2,892,000 25 (Base Project Allocation - $926,000) 26 (Land Allocation - $1,560,000) 27 (Design and Contingencies - $406,000) 28 (2) Widen to four lanes from SR 0987 to 29 Willowbrook Road, Hanover Township 2,770,000 30 (Base Project Allocation - $1,540,000) 19970S0185B0697 - 39 -
1 (Land Allocation - $948,000) 2 (Design and Contingencies - $282,000) 3 (d) SR 0987 4 (1) Widen to four lanes from Avenue A to 5 SR 3017, Catasauqua Borough 3,660,000 6 (Base Project Allocation - $2,842,000) 7 (Land Allocation - $418,000) 8 (Design and Contingencies - $400,000) 9 (2) WIDENING OF SCHOENERSVILLE AND AIRPORT <-- 10 ROADS, EXTENSION OF RACE STREET, 11 REALIGNMENT OF AIRPORT ROAD/RACE STREET 12 INTERSECTION IN HANOVER TOWNSHIP 4,066,000 13 (BASE PROJECT ALLOCATION - $3,466,000) 14 (LAND ALLOCATION - $600,000) 15 Section 340. Luzerne County. 16 (a) I-80 17 (1) White Haven to Carbon County Line, 18 Pavement Rehabilitation and Safety 19 Improvements 101,000 20 (Base Project Allocation - $90,000) 21 (Land Allocation - $1,000) 22 (Design and Contingencies - $10,000) 23 (b) I-81 24 (1) Schuylkill County Line to I-80, 25 Pavement Rehabilitation and Safety 26 Improvements 1,200,000 27 (Base Project Allocation - $1,074,000) 28 (Land Allocation - $6,000) 29 (Design and Contingencies - $120,000) 30 (2) PA 29 to Lackawanna County Line, 19970S0185B0697 - 40 -
1 Pavement Rehabilitation and Safety 2 Improvements 1,400,000 3 (Base Project Allocation - $1,253,000) 4 (Land Allocation - $7,000) 5 (Design and Contingencies - $140,000) 6 (c) SR 2007 7 (1) Reconstruction of Northampton Street 8 and SR 6309 at the Interchange of SR 9 2007 and SR 6309 900,000 10 (Base Project Allocation - $750,000) 11 (Land Allocation - $50,000) 12 (Design and Contingencies - $100,000) 13 Section 341. Lycoming County. 14 (a) SR 220 15 (1) Shrewsbury Township, SR 220 North of 16 Tivoli to T-650, Raise Grade to Reduce 17 Flooding 750,000 18 (Base Project Allocation - $600,000) 19 (Land Allocation - $50,000) 20 (Design and Contingencies - $100,000) 21 (2) Shrewsbury Township, SR 220 South of 22 Glen Mawr to SR 2083, 0.7 Mile 23 Reconstruction, Improve Horizontal and 24 Vertical Alignment 1,250,000 25 (Base Project Allocation - $1,000,000) 26 (Land Allocation - $50,000) 27 (Design and Contingencies - $200,000) 28 (3) Shrewsbury Township, SR 220 North of 29 Glen Mawr to Former LR 41035 Turnback 30 Route, 0.3 Mile Reconstruction 720,000 19970S0185B0697 - 41 -
1 (Base Project Allocation - $600,000) 2 (Land Allocation - $20,000) 3 (Design and Contingencies - $100,000) 4 (4) Spot improvements in Shrewsbury and 5 Penn Townships, Lycoming County and 6 Davidson Township, Sullivan County 9,250,000 7 (Base Project Allocation - $8,000,000) 8 (Land Allocation - $250,000) 9 (Design and Contingencies - $1,000,000) 10 (b) SR 405 11 (1) Muncy Creek Township, SR 405, East of 12 Muncy between I-180 and PA 405/PA 442 13 Intersection, 0.5 Mile Reconstruction, 14 Raise Grade to Reduce Flooding 950,000 15 (Base Project Allocation - $800,000) 16 (Land Allocation - $50,000) 17 (Design and Contingencies - $100,000) 18 (2) I-180 to PA 405, Muncy Creek Township, 19 reconstruction to reduce recurrent 20 flooding 950,000 21 (Base Project Allocation - $800,000) 22 (Land Allocation - $50,000) 23 (Design and Contingencies - $100,000) 24 (C) I-180 <-- 25 (1) WILLIAMSPORT BELTWAY, PAVEMENT 26 REHABILITATION 550,000 27 (BASE PROJECT ALLOCATION - $500,000) 28 (DESIGN AND CONTINGENCIES - $50,000) 29 (2) CONSTRUCTION OF LYCOMING MALL 30 INTERCHANGE AND RELATED ROAD NETWORK 19970S0185B0697 - 42 -
1 IMPROVEMENTS 13,400,000 2 (BASE PROJECT ALLOCATION - $8,600,000) 3 (LAND ALLOCATION - $3,600,000) 4 (DESIGN AND CONTINGENCIES - $1,200,000) 5 (D) WILLIAMSPORT REGIONAL AIRPORT ACCESS ROAD 6 (1) CONSTRUCTION OF A NEW TWO LANE ACCESS 7 ROAD FROM THE WANNERSVILLE ROAD 8 INTERCHANGE OF I-180 TO THE 9 WILLIAMSPORT REGIONAL AIRPORT 15,000,000 10 (BASE PROJECT ALLOCATION - $12,500,000) 11 (LAND ALLOCATION - $250,000) 12 (DESIGN AND CONTINGENCIES - $2,000,000) 13 Section 342. McKean County (Reserved). 14 Section 343. Mercer County. 15 (a) I-79 16 (1) Lawrence County Line to Crawford 17 County Line, Pavement Rehabilitation 18 and Safety Improvements 2,600,000 19 (Base Project Allocation - $2,327,000) 20 (Land Allocation - $13,000) 21 (Design and Contingencies - $260,000) 22 (b) I-80 23 (1) PA 173 to Venango County Line, Safety 24 Improvements and Pavement 25 Rehabilitation, Length 4.0 Miles 12,600,000 26 (Base Project Allocation - $12,000,000) 27 (Design and Contingencies - $600,000) 28 (c) PA 208 29 (1) From PA 258 to Old Route 258, 30 Including Bridge over I-79, Widen to 48 19970S0185B0697 - 43 -
1 Feet 14,700,000 2 (Base Construction Allocation - 3 $12,500,000) 4 (Land Allocation - $1,000,000) 5 (Design and Contingencies - $1,200,000) 6 (D) SR 60 <-- 7 (1) BRIDGE REHABILITATION AND INTERCHANGE 8 IMPROVEMENT AT SR 318 4,080,000 9 (BASE PROJECT ALLOCATION - $3,800,000) 10 (LAND ALLOCATION - $80,000) 11 (DESIGN AND CONTINGENCIES - $200,000) 12 Section 344. Mifflin County (Reserved). 13 Section 345. Monroe County. 14 (a) I-80 15 (1) Carbon County Line to PA 115, Pavement 16 Rehabilitation and Safety Improvements 100,000 17 (Base Project Allocation - $89,000) 18 (Land Allocation - $1,000) 19 (Design and Contingencies - $10,000) 20 (2) Construction of Full Interchange at I- 21 80, Exit 44 to Connect with US 611 13,000,000 22 (Base Construction Allocation - 23 $10,000,000) 24 (Land Allocation - $2,000,000) 25 (Design and Contingencies - $1,000,000) 26 (b) SR 115 27 (1) From I-80, at Exit 43, South 28 Approximately 3.5 Miles to Long Pond 29 Road, Stabilize and Widen Shoulders 11,000,000 30 (Base Project Allocation - $10,500,000) 19970S0185B0697 - 44 -
1 (Design and Contingencies - $500,000) 2 (C) SR 209 <-- 3 (1) CONSTRUCTION OF 4-LANE DIVIDED 4 RELOCATION OF SR 209 AT INTERSECTION 5 WITH SR 402 IN SMITHFIELD TOWNSHIP 49,500,000 6 (BASE PROJECT ALLOCATION - $35,000,000) 7 (LAND ALLOCATION - $10,000,000) 8 (DESIGN AND CONTINGENCIES - $4,500,000) 9 (2) TRANSPORTATION STUDY FOR POSSIBLE 10 MARSHALLS CREEK BYPASS 300,000 11 (DESIGN AND CONTINGENCIES - $300,000) 12 (D) SR 611 13 (1) WIDEN TO 64 FEET BETWEEN T-535 AND T- 14 537 IN POCONO TOWNSHIP 2,600,000 15 (BASE PROJECT ALLOCATION - $2,000,000) 16 (LAND ALLOCATION - $500,000) 17 (DESIGN AND CONTINGENCIES - $100,000) 18 (2) RESTORATION OF SR 611 BETWEEN SCOTRUN 19 AND SWIFTWATER, POCONO TOWNSHIP 2,010,000 20 (BASE CONSTRUCTION ALLOCATION - 21 $2,000,000) 22 (DESIGN AND CONTINGENCIES - $10,000) 23 (E) POCONO SCENIC VISTAS 24 (1) CONSTRUCTION OF POCONO SCENIC VISTAS 25 IN THE LONG POND AREA 1,250,000 26 (BASE PROJECT ALLOCATION - $100,000) 27 (LAND ALLOCATION - $1,050,000) 28 (DESIGN AND CONTINGENCIES - $100,000) 29 Section 346. Montgomery County. 30 (a) Souder Road 19970S0185B0697 - 45 -
1 (1) Reconstruct Portion of Souder Road to 2 Remove Curves in Franconia Township 540,000 3 (Base Project Allocation - $400,000) 4 (Land Allocation - $100,000) 5 (Design and Contingencies - $40,000) 6 (b) SR 0029 7 (1) Collegeville Borough, SR 0029 8 realignment between Main Street and 1st 9 Avenue 1,900,000 10 (Base Project Allocation - $750,000) 11 (Land Allocation - $950,000) 12 (Design and Contingencies - $200,000) 13 (c) PA 23 14 (1) River Road at Balligomingo, West 15 Conshohocken Township, Roadway 16 Relocation and Resignalization 424,000 17 (Base Project Allocation - $400,000) 18 (Land Allocation - $24,000) 19 (d) PA 463 20 (1) US 611 to PA 152, Horsham Township, 21 Intersection Improvements, Widening and 22 Restoration 830,000 23 (Base Project Allocation - $650,000) 24 (Land Allocation - $55,000) 25 (Design and Contingencies - $125,000) 26 Section 347. Montour County. 27 (a) I-80 28 (1) Northumberland County Line to Columbia 29 County Line, Pavement Rehabilitation 30 and Safety Improvements 1,100,000 19970S0185B0697 - 46 -
1 (Base Project Allocation - $984,000) 2 (Land Allocation - $6,000) 3 (Design and Contingencies - $110,000) 4 Section 348. Northampton County. 5 (a) I-78 6 (1) Lehigh County Line to PA 412, Pavement 7 Rehabilitation and Safety Improvements 300,000 8 (Base Project Allocation - $268,000) 9 (Land Allocation - $2,000) 10 (Design and Contingencies - $30,000) 11 Section 349. Northumberland County. 12 (a) I-80 13 (1) PA 254 to Montour County Line, 14 Pavement Rehabilitation and Safety 15 Improvements 100,000 16 (Base Project Allocation - $89,000) 17 (Land Allocation - $1,000) 18 (Design and Contingencies - $10,000) 19 (b) T-577, Marsh Drive 20 (1) Access Road and Related Improvement in 21 Milton Borough and West Chillisquaque 22 Township 1,600,000 23 (Base Project Allocation - $1,100,000) 24 (Land Allocation - $300,000) 25 (Design and Contingencies - $200,000) 26 (c) I-80 27 (1) Milepost 207 to Milepost 214, 28 Restoration 600,000 29 (Design and Contingencies - $600,000) 30 Section 350. Perry County. 19970S0185B0697 - 47 -
1 (a) SR 17 2 (1) Resurface and Construct Shoulder on SR 3 17 from Jackson Township through 4 Saville Township 1,080,000 5 (Base Project Allocation - $1,000,000) 6 (Design and Contingencies - $80,000) 7 (b) SR 233 8 (1) Resurface and Construct Shoulder on SR 9 233 from Green Park, Tyrone Township to 10 Cumberland County Line 620,000 11 (Base Project Allocation - $600,000) 12 (Design and Contingencies - $20,000) 13 (c) SR 274 14 (1) Resurface and Construct Shoulder on SR 15 274 from Blain, Jackson Township, to 16 Franklin County Line 820,000 17 (Base Project Allocation - $800,000) 18 (Design and Contingencies - $20,000) 19 (d) SR 849 20 (1) Resurface and Construct Shoulder from 21 Newport to SR 34 930,000 22 (Base Project Allocation - $900,000) 23 (Design and Contingencies - $30,000) 24 (e) SR 850 25 (1) Resurface and Construct Shoulder on SR 26 850 from Kistler to Juniata County 27 Line 570,000 28 (Base Project Allocation - $520,000) 29 (Design and Contingencies - $50,000) 30 (2) Resurface and Construct Shoulder on SR 19970S0185B0697 - 48 -
1 850 from SR 34 in Shermans Dale to 2 Village of Keystone 410,000 3 (Base Project Allocation - $400,000) 4 (Design and Contingencies - $10,000) 5 Section 351. Philadelphia County. 6 (a) I-76 7 (1) Route 1 to I-95, Pavement 8 Rehabilitation and Safety Improvements 1,000,000 9 (Base Project Allocation - $895,000) 10 (Land Allocation - $5,000) 11 (Design and Contingencies - $100,000) 12 (b) I-95 13 (1) Delaware County Line to Bucks County 14 Line, Pavement and Bridge 15 Rehabilitation and Safety Improvements 26,440,000 16 (Base Project Allocation - $25,340,000) 17 (Land Allocation - $100,000) 18 (Design and Contingencies - $1,000,000) 19 (c) Germantown Avenue 20 (1) Reconstruct Germantown Avenue 7,500,000 21 (d) SR 1007 22 (1) Adams Avenue Connector, Torresdale to 23 Aramingo Avenue, New Roadway 376,000 24 (Base Project Allocation - $286,000) 25 (Land Allocation - $70,000) 26 (Design and Contingencies - $20,000) 27 (e) I-95 28 (1) Jackson Street to Ritner Avenue, (200 29 Block of Front Street), Install 30 Safety/Protective Wall 44,000 19970S0185B0697 - 49 -
1 (Base Project Allocation - $35,000) 2 (Design and Contingencies - $9,000 3 (F) CHESTNUT STREET <-- 4 (1) CHESTNUT STREET INTERMODAL IMPROVEMENT 5 PROJECT 4,367,000 6 Section 352. Pike County (Reserved). 7 Section 353. Potter County. 8 (a) SR 2002 9 (1) Reconstruct to 22 Feet from Germania 10 Station to Galeton 2,595,000 11 (Base Project Allocation - $2,157,000) 12 (Land Allocation - $250,000) 13 (Design and Contingencies - $188,000) 14 Section 354. Schuylkill County. 15 (a) I-81 16 (1) PA 25 to PA 54, Pavement 17 Rehabilitation and Safety Improvements 2,000,000 18 (Base Project Allocation - $1,790,000) 19 (Land Allocation - $10,000) 20 (Design and Contingencies - $200,000) 21 (2) PA 901 Interchange, Reconstruction 800,000 22 (Base Project Allocation - $716,000) 23 (Land Allocation - $4,000) 24 (Design and Contingencies - $80,000) 25 (3) SR 4007, Gordon Road, New Interchange 1,600,000 26 (Base Project Allocation - $1,432,000) 27 (Land Allocation - $8,000) 28 (Design and Contingencies - $160,000) 29 (4) CONSTRUCTION OF A NEW REST AREA ON I- <-- 30 81 NORTHBOUND IN FOSTER TOWNSHIP 6,240,000 19970S0185B0697 - 50 -
1 (BASE PROJECT ALLOCATION - $3,900,000) 2 (LAND ALLOCATION - $1,475,000) 3 (DESIGN AND CONTINGENCIES - $865,000) 4 (b) SR 125 5 (1) Resurface and Reconstruct SR 125 from 6 SR 25 to Northumberland County Line 825,000 7 (Base Project Allocation - $750,000) 8 (Design and Contingencies - $75,000) 9 (c) SR 309 10 (1) Intersection Improvements with SR 443, 11 West Penn Township 1,050,000 <-- 12 (Base Project Allocation - $1,000,000) 13 WEST PENN TOWNSHIP 2,050,000 <-- 14 (BASE PROJECT ALLOCATION - $2,000,000) 15 (Land Allocation - $40,000) 16 (Design and Contingencies - $10,000) 17 (2) Corridor Study of SR 309 250,000 18 (Design and Contingencies - $250,000) 19 (3) RESURFACE SR 309 FROM WEST PENN <-- 20 TOWNSHIP LINE TO T-503 IN TAMAQUA 2,500,000 21 (BASE PROJECT ALLOCATION - $2,400,000) 22 (DESIGN AND CONTINGENCIES - $100,000) 23 (D) SR 61 24 (1) RESURFACE SR 61 FROM SR 183 TO MT. 25 CARBON LINE IN NORTH MANHEIM TOWNSHIP 1,600,000 26 (BASE PROJECT ALLOCATION - $1,520,000) 27 (DESIGN AND CONTINGENCIES - $80,000) 28 (2) CONSTRUCT MEDIAN BARRIER ON SR 61 FROM 29 SR 183 TO SR 2015 IN NORTH MANHEIM 30 TOWNSHIP 4,660,000 19970S0185B0697 - 51 -
1 (BASE PROJECT ALLOCATION - $3,800,000) 2 (LAND ALLOCATION - $650,000) 3 (DESIGN AND CONTINGENCIES - $210,000) 4 (3) CONSTRUCTION OF SAFETY IMPROVEMENTS ON 5 SR 61 FROM SR 2014 TO SR 895 15,000,000 6 (BASE PROJECT ALLOCATION - $8,000,000) 7 (LAND ALLOCATION - $5,500,000) 8 (DESIGN AND CONTINGENCIES - $1,500,000) 9 (E) SR 895 10 (1) RESTORATION OF SR 895 FROM SR 183 TO 11 SOUTH MANHEIM TOWNSHIP IN WAYNE 12 TOWNSHIP 1,125,000 13 (BASE PROJECT ALLOCATION - $1,000,000) 14 (LAND ALLOCATION - $25,000) 15 (DESIGN AND CONTINGENCIES - $100,000) 16 (F) SR 924 17 (1) RESTORATION OF SR 924 IN VICINITY OF 18 SHENANDOAH HEIGHTS 1,687,000 19 (BASE PROJECT ALLOCATION - $1,300,000) 20 (LAND ALLOCATION - $88,000) 21 (DESIGN AND CONTINGENCIES - $299,000) 22 Section 355. Snyder County. 23 (a) US 11/15 24 (1) Golden Strip, Monroe Township, Widen 25 Roadway and Improve the Intersections 26 From North of Selinsgrove Bypass to 27 Shamokin Dam Borough Line, Length 2.0 28 Miles 6,000,000 29 (Base Project Allocation - $5,300,000) 30 (Land Allocation - $500,000) 19970S0185B0697 - 52 -
1 (Design and Contingencies - $200,000) 2 Section 356. Somerset County. 3 (a) US 219 4 (1) Davidsville to US 30 Interchange, 5 Pavement Restoration 1,740,000 6 (Base Project Allocation - $1,640,000) 7 (Design and Contingencies - $100,000) 8 Section 357. Sullivan County (Reserved). 9 Section 358. Susquehanna County. 10 (a) I-81 11 (1) Lackawanna County Line to New York 12 State Line, Pavement Rehabilitation and 13 Safety Improvements 2,600,000 14 (Base Project Allocation - $2,327,000) 15 (Land Allocation - $13,000) 16 (Design and Contingencies - $260,000) 17 Section 359. Tioga County. 18 (a) US 15 19 (1) Bridge Spanning Tioga Dam, New Two- 20 Lane Bridge 125,000 21 (Design and Contingencies - $125,000) 22 Section 360. Union County. 23 (a) US 15 24 (1) Snyder/Union County Line to T-365, 25 Reconstruction and Safety Improvements 1,900,000 26 (Base Project Allocation - $1,600,000) 27 (Land Allocation - $100,000) 28 (Design and Contingencies - $200,000) 29 Section 361. Venango County (Reserved). 30 Section 362. Warren County (Reserved). 19970S0185B0697 - 53 -
1 Section 363. Washington County. 2 (a) I-70 3 (1) PA 481 to Westmoreland County Line, 4 Pavement Rehabilitation and Safety 5 Improvements 600,000 6 (Base Project Allocation - $537,000) 7 (Land Allocation - $3,000) 8 (Design and Contingencies - $60,000) 9 (b) I-79 10 (1) Greene, Washington, Allegheny, Butler, 11 Lawrence, Mercer, Crawford and Erie 12 County Lines, West Virginia to I-90, 13 Intelligent Transportation Systems 14 Study 75,000 15 (Design and Contingencies - $75,000) 16 (2) Greene County Line to Milepost 48, 17 Pavement Rehabilitation and Safety 18 Improvements 2,500,000 19 (Base Project Allocation - $2,237,000) 20 (Land Allocation - $13,000) 21 (Design and Contingencies - $250,000) 22 (3) Milepost 39.4 to Milepost 42, 23 Meadowlands Area, Resurfacing 240,000 24 (Base Project Allocation - $220,000) 25 (Design and Contingencies - $20,000) 26 Section 364. Wayne County. 27 (a) I-84 28 (1) Lackawanna County Line to Pike County 29 Line, Pavement Rehabilitation and 30 Safety Improvements 600,000 19970S0185B0697 - 54 -
1 (Base Project Allocation - $537,000) 2 (Land Allocation - $3,000) 3 (Design and Contingencies - $60,000) 4 Section 365. Westmoreland County. 5 (a) I-70 6 (1) Washington County Line to I-76, 7 Pavement Rehabilitation and Safety 8 Improvements 1,700,000 9 (Base Project Allocation - $1,521,000) 10 (Land Allocation - $9,000) 11 (Design and Contingencies - $170,000) 12 (b) SR 3111 13 (1) Center Avenue, Borough of New Stanton, 14 Two-Lane Relocation 940,000 15 (Base Project Allocation - $700,000) 16 (Land Allocation - $40,000) 17 (Design and Contingencies - $200,000) 18 (c) SR 982 19 (1) Reconstruction of SR 982, Including 20 Climbing Lanes from Laurelville, Mt. 21 Pleasant Township, to Intersection with 22 SR 31 in Fayette County 6,500,000 23 (Base Project Allocation - $5,000,000) 24 (Land Allocation - $500,000) 25 (Design and Contingencies - $1,000,000) 26 (D) SR 356 <-- 27 (1) RECONSTRUCTION OF SR 356, INCLUDING 28 WIDENING, OVERLAY, AND SAFETY 29 IMPROVEMENTS 3,000,000 30 (BASE PROJECT ALLOCATION - $2,500,000) 19970S0185B0697 - 55 -
1 (LAND ALLOCATION - $100,000) 2 (DESIGN AND CONTINGENCIES - $400,000) 3 Section 366. Wyoming County (Reserved). 4 Section 367. York County. 5 (a) I-83 6 (1) US 30 to Maryland State Line, Pavement <-- 7 Rehabilitation and Safety Improvements 4,000,000 8 (Base Project Allocation - $3,580,000) 9 (Land Allocation - $20,000) 10 (Design and Contingencies - $400,000) 11 (2) (1) Feasibility Study for New Exit at <-- 12 Windy Hill Road, New Freedom Borough 100,000 13 (Design and Contingencies - $100,000) 14 (b) SR 74 15 (1) Reconstruction of SR 74 from Red Lion 16 to Intersection with SR 2054 1,600,000 17 (Base Project Allocation - $1,500,000) 18 (Design and Contingencies - $100,000) 19 (c) SR 3072 20 (1) Widen SR 3072 to Three Lanes, Hanover 21 Borough 200,000 22 (Base Project Allocation - $100,000) 23 (Land Allocation - $50,000) 24 (Design and Contingencies - $50,000) 25 (d) SR 4001 26 (1) Widen SR 4001 to Three FOUR Lanes from <-- 27 US 30 to Church Road 4,105,000 28 (Base Project Allocation - $3,476,000) 29 (Land Allocation - $296,000) 30 (Design and Contingencies - $333,000) 19970S0185B0697 - 56 -
1 (E) SR 0182 <-- 2 (1) LANE ADDITION, PINE GROVE ROAD TO 3 POWDER MILL ROAD 1,570,000 4 Section 368. Statewide Wetland Mitigation. 5 (a) Statewide 6 (1) Construction of Advanced Wetland 7 Mitigation Projects Necessary to 8 Replace Wetlands Displaced by Highway 9 Projects 1,000,000 10 (Base Project Allocation - $800,000) 11 (Land Allocation - $100,000) 12 (Design and Contingencies - $100,000) 13 CHAPTER 5 14 MISCELLANEOUS PROVISIONS 15 Section 501. Federal funds. 16 All moneys received from the Federal Government for the 17 construction of the projects specifically itemized in this act 18 are also hereby appropriated for those projects. 19 Section 502. Allocation of funds. 20 Whenever as determined by the Department of Transportation 21 that the full estimated financial costs of the projects itemized 22 in this act are not necessary for the proper design, acquisition 23 or construction of such projects, the excess funds no longer 24 required may be allocated by the Pennsylvania Department of 25 Transportation to increase the estimated costs of any one or 26 more of the projects specifically itemized in a capital budget. 27 Section 503. Estimated useful life. 28 The General Assembly states that the estimated useful life of 29 the highway capital projects itemized in this act is 30 years. 30 Section 504. Effective date. 19970S0185B0697 - 57 -
1 This act shall take effect immediately. L27L72WMB/19970S0185B0697 - 58 -