        PRIOR PRINTER'S NOS. 178, 444                  PRINTER'S NO. 697

THE GENERAL ASSEMBLY OF PENNSYLVANIA


SENATE BILL

No. 185 Session of 1997


        INTRODUCED BY CORMAN AND STOUT, JANUARY 23, 1997

        SENATOR TILGHMAN, APPROPRIATIONS, RE-REPORTED AS AMENDED,
           MARCH 11, 1997

                                     AN ACT

     1  Providing for the highway capital budget project itemization for
     2     the fiscal year 1996-1997.

     3     The General Assembly of the Commonwealth of Pennsylvania
     4  hereby enacts as follows:
     5                             CHAPTER 1
     6                         GENERAL PROVISIONS
     7  Section 101.  Short title.
     8     This act shall be known and may be cited as the Highway
     9  Capital Budget Project Itemization Act of 1996-1997.
    10  Section 102.  Total authorization.
    11     The total authorization for the capital projects itemized in
    12  this act and to be constructed by the Department of
    13  Transportation, its successors or assigns and to be financed
    14  from current revenues of the Motor License Fund shall be
    15  $2,684,974,000 $2,971,444,000.                                    <--
    16  Section 103.  Itemization of public highway projects.
    17     Additional capital projects in the category of public highway

     1  projects to be constructed by the Department of Transportation,
     2  its successors or assigns and to be financed from current
     3  revenues of the Motor License Fund are itemized in Chapter 3,
     4  together with their respective estimated financial costs.
     5                             CHAPTER 3
     6                         ITEMIZED PROJECTS
     7                                                           Total
     8                                                          Project
     9             Project                                    Allocation
    10  Section 301.  Adams County (Reserved).
    11  Section 302.  Allegheny County.
    12     (a)  I-276
    13         (1)  Milepost 6 North to I-79, Pavement
    14             Rehabilitation and Safety Improvements      1,300,000
    15             (Base Project Allocation - $1,163,000)
    16             (Land Allocation - $7,000)
    17             (Design and Contingencies - $130,000)
    18     (b)  I-376
    19         (1)  PA 130 to I-76, Pavement
    20             Rehabilitation and Safety Improvements        500,000
    21             (Base Project Allocation - $447,000)
    22             (Land Allocation - $3,000)
    23             (Design and Contingencies - $50,000)
    24         (2)  I-376 Access Ramp, Construction of an
    25             Off-Ramp from Parkway East to
    26             Pittsburgh Technology Center Site          12,000,000
    27     (c)  PA 19
    28         (1)  Gilkeson Road to Cochran Road,
    29             Pavement Rehabilitation and Safety
    30             Improvements                                  450,000
    19970S0185B0697                  - 2 -

     1             (Base Project Allocation - $450,000)
     2     (d)  Fort Duquesne Boulevard
     3         (1)  Realignment of Fort Duquesne
     4             Boulevard                                   8,400,000
     5     (e)  Liberty Avenue
     6         (1)  Reconstruction of Liberty Avenue           6,600,000
     7     (f)  North Shore Drive
     8         (1)  Relocation of North Shore Drive to the
     9             North Side of Three Rivers Stadium Site
    10             in Order to Open Access to the
    11             Riverfront                                  8,100,000
    12     (g)  I-79
    13         (1)  Completion of the Interchange at I-79
    14             and SR 0060 to Permit Easier Access to
    15             Airport                                    10,000,000
    16         (2)  Design and construction of an
    17             Interchange at I-79 and Parkway West to
    18             Permit Easier Access to and from the
    19             Airport and I-79                           17,125,000
    20             (Base Project Allocation - $15,000,000)
    21             (Design and Contingencies - $2,125,000)
    22         (3)  Construct Missing Link Between I-79
    23             and Parkway West                           16,000,000
    24     (h)  US 22/30
    25         (1)  Reconstruction of US 22/30 Between
    26             Imperial Exit and McDonald Exit            15,000,000
    27     (i)  SR 0028
    28         (1)  Widen SR 0028 Between Downtown and
    29             40th Street Bridge                         30,000,000
    30         (2)  Installation of Noise Barriers on both
    19970S0185B0697                  - 3 -

     1             sides of SR 0028 from Highland Park
     2             Bridge to Lexington Avenue in Aspinwall
     3             Borough                                     5,000,000
     4     (j)  SR 0051
     5         (1)  Reconstruction of Intersection of SR
     6             0051 and SR 0088                           14,518,000
     7     (k)  Smithfield Street
     8         (1)  Reconstruction of the Smithfield
     9             Street Bridge to Support Retail
    10             Activity                                   18,000,000
    11     (l)  Wood Street
    12         (1)  Reconstruction of Wood Street to
    13             Support Retail Activities                  27,000,000
    14     (m)  Fifth and Forbes Reconstruction
    15         (1)  Reconstruction to Fifth and Forbes
    16             Avenue Corridor to Promote Retail
    17             Development                                12,000,000
    18     (n)  Golden Triangle Intermodal Facility/LRT
    19         Station
    20         (1)  Development of a New Intermodal
    21             Facility and Transit Stop to Serve the
    22             Retail Centers in Downtown                 13,000,000
    23     (o)  North Side Intermodal Facility
    24         (1)  Development of a Major Commuter
    25             Interceptor Intermodal Facility and
    26             Transit Station on the North Side          34,420,000
    27     (p)  Findlay Connector
    28         (1)  Construction of Highway Connection
    29             Between Pittsburgh International
    30             Airport and Route 22 West in Order to
    19970S0185B0697                  - 4 -

     1             Assist the Development of the Airport
     2             Technology Center                         100,000,000
     3     (q)  Cargo Interchange
     4         (1)  Development of State-of-the-Art Cargo
     5             Interchange Facility at the Cargo
     6             Terminal of the Greater Pittsburgh
     7             International Airport to Support
     8             Regional Business Growth in Global
     9             Markets                                    16,000,000
    10     (r)  Lawrenceville Industrial Access Road
    11         (1)  Construction of a Highway Bypass to
    12             Permit Truck and Passenger Cars Easier
    13             Access into and through the
    14             Lawrenceville Industrial and Commercial
    15             Areas                                      46,800,000
    16     (s)  Mon-Fayette Expressway
    17         (1)  Construction of the Mon-Fayette
    18             Expressway from Pittsburgh to Route 51    675,000,000
    19     (t)  Multi-Modal Corridor
    20         (1)  Transportation System Connecting
    21             Downtown Pittsburgh with the Greater
    22             Pittsburgh International Airport          363,750,000
    23     (u)  Tech World/Airport Transit Connection
    24         (1)  Creation of a Transit Connection
    25             Between the Airport Technology Center
    26             and the Greater Pittsburgh
    27             International Airport                     135,000,000
    28     (v)  Settlers Cabin Interchange
    29         (1)  Construction of a New Interchange
    30             Along Parkway West in Robinson
    19970S0185B0697                  - 5 -

     1             Township                                   10,750,000
     2     (w)  South Portal of Liberty Tubes
     3         (1)  Construction of a New Free-Flowing
     4             Intersection to Accommodate Traffic
     5             Flow                                       23,450,000
     6     (x)  Ewing Interchange
     7         (1)  Construction of a New Interchange
     8             Along Parkway West in Moon Township
     9             Adjacent to the Pittsburgh
    10             International Airport                      16,350,000
    11     (y)  West End Circle
    12         (1)  Purchase of a Portion of West End
    13             Branch of Wheeling and Lake Erie
    14             Railway Right-of-Way to Accommodate
    15             West End Circle Project of PennDOT and
    16             Reconstruct Railroad Interchange with
    17             CSXT via the Pittsburgh Industrial
    18             Railroad South of Bridgeville between
    19             Milepost 57 and Milepost 61                12,800,000
    20             (Land Allocation - $12,500,000)
    21             (Design and Contingencies - $300,000)
    22     (z)  Pittsburgh Transportation Corridor
    23         (1)  Purchase Wheeling and Lake Erie
    24             Railway Main Right-of-Way from Rook
    25             Yard (Milepost 56 to Longview Milepost
    26             46) to Create Two New Transportation
    27             Corridors to Downtown Pittsburgh           18,400,000
    28             (Land Allocation - $18,000,000)
    29             (Design and Contingencies - $400,000)
    30     (aa)  Pittsburgh Technology Center
    19970S0185B0697                  - 6 -

     1         (1)  Construction of an Access Road between
     2             Pittsburgh Technology Center and South
     3             Side of LTV Site                            5,000,000
     4     (bb)  SR 3009
     5         (1)  Improvement of Intersection of SR
     6             3009, Baptist Road, and SR 2040,
     7             Broughton Road, Bethel Park                 1,200,000
     8             (Base Project Allocation - $1,000,000)
     9             (Land Allocation - $100,000)
    10             (Design and Contingencies - $100,000)
    11     (cc)  SR 2040 to SR 88
    12         (1)  200-Space Park'n Ride Lot                    124,000
    13             (Base Project Allocation - $120,000)
    14             (Land Allocation - $2,000)
    15             (Design and Contingencies - $2,000)
    16     (dd)  I-279, I-376
    17         (1)  Connector, City of Pittsburgh, New
    18             Construction                                  320,000
    19             (Design and Contingencies - $320,000)
    20     (EE)  SR 2046                                                  <--
    21         (1)  WIDEN AND REALIGN INTERSECTION OF
    22             STREETS RUN ROAD AT PROSPECT ROAD IN
    23             BALDWIN BOROUGH                               300,000
    24     (FF)  SR 2120
    25         (1)  WIDEN INTERSECTION OF BRINTON ROAD AND
    26             YOST BOULEVARD IN BRADDOCK HILLS
    27             BOROUGH                                        75,000
    28     (GG)  SR 22
    29         (1)  REALIGN AND CORRECT SLIDE OF WILLIAM
    30             PENN HIGHWAY IN CHURCHILL BOROUGH           3,000,000
    19970S0185B0697                  - 7 -

     1     (HH)  SR 837
     2         (1)  ADD ADDITIONAL LANES TO SR 837 IN
     3             HOMESTEAD BOROUGH                              50,000
     4     (II)  SR 2064
     5         (1)  REALIGN AND STABILIZE LIME HOLLOW ROAD
     6             IN PENN HILLS BOROUGH                         200,000
     7     (JJ)  SR 0791
     8         (1)  ADD TURNING LANE ON RODI ROAD AT
     9             HOOVER ROAD IN PENN HILLS BOROUGH             500,000
    10     (KK)  SR 0791
    11         (1)  ADD TURNING LANE ON RODI ROAD AT DUFF
    12             ROAD IN PENN HILLS BOROUGH                    500,000
    13     (LL)  SR 0791
    14         (1)  ADD TURNING LANE ON RODI ROAD AT
    15             STONELEDGE IN PENN HILLS BOROUGH              500,000
    16     (MM)  LAWRENCEVILLE INDUSTRIAL ACCESS ROAD
    17         (1)  CONSTRUCTION OF A 2-LANE, 38-MILE
    18             ACCESS HIGHWAY ALONG THE ALLEGHENY
    19             RIVER BETWEEN 21ST AND 62ND STREETS IN
    20             THE CITY OF PITTSBURGH'S LAWRENCEVILLE
    21             NEIGHBORHOOD                               50,000,000
    22  Section 303.  Armstrong County (Reserved).
    23  Section 304.  Beaver County.
    24     (a)  SR 51
    25         (1)  Reconstruct and rehabilitate SR 51,
    26             including hillside in City of
    27             Aliquippa                                  25,000,000
    28             (Base Project Allocation
    29             - $25,000,000)
    30     (b)  PA 151
    19970S0185B0697                  - 8 -

     1         (1)  Hopewell Industrial Park to PA 60,
     2             Hopewell Township, Reconstruction              83,000
     3             (Base Project Allocation - $75,000)
     4             (Design and Contingencies - $8,000)
     5  Section 305.  Bedford County.
     6     (a)  PA 56
     7         (1)  PA 56 Extension, Bedford Township
     8             Access Road and Related Improvements          325,000
     9             (Base Project Allocation - $250,000)
    10             (Land Allocation - $50,000)
    11             (Design and Contingencies - $25,000)
    12     (b)  I-99
    13         (1)  Bedford Borough Line North to Blair
    14             County Line, Roadway Rehabilitation and
    15             Safety Improvements                         1,440,000
    16             (Base Project Allocation - $1,320,000)
    17             (Land Allocation - $60,000)
    18             (Design and Contingencies - $60,000)
    19     (c)  Construction of Wetlands
    20         (1)  Construction of Numerous Five-Acre to
    21             Ten-Acre Wetland Projects to Be Used
    22             for Future Mitigation Purposes for
    23             Highway Construction in Bedford, Blair,
    24             Cambria, Fulton, Huntingdon and
    25             Somerset Counties                             500,000
    26             (Base Project Allocation - $300,000)
    27             (Land Allocation - $50,000)
    28             (Design and Contingencies - $150,000)
    29     (d)  I-99
    30         (1)  Bedford and Blair Counties, US 220
    19970S0185B0697                  - 9 -

     1             Conversion to I-99                             20,000
     2             (Base Project Allocation - $20,000)
     3     (E)  SR 4009                                                   <--
     4         (1)  IMPROVEMENTS OF INTERSECTION OF SR
     5             4009, SUNNYSIDE ROAD AND SR 1001, NORTH
     6             RICHARD STREET, BEDFORD BOROUGH               550,000
     7             (BASE PROJECT ALLOCATION - $400,000)
     8             (LAND ALLOCATION - $75,000)
     9             (DESIGN AND CONTINGENCIES - $75,000)
    10  Section 306.  Berks County.
    11     (a)  I-78
    12         (1)  Lebanon County Line to East of
    13             Frystown, Rehabilitation and Safety
    14             Improvements                               13,395,000
    15             (Base Project Allocation - $12,500,000)
    16             (Land Allocation - $45,000)
    17             (Design and Contingencies - $750,000)
    18         (2)  Hamburg to Lehigh County, Pavement,
    19             Bridge Rehabilitation and Safety
    20             Improvements                               26,127,000
    21             (Base Project Allocation - $25,477,000)
    22             (Design and Contingencies - $650,000)
    23     (b)  SR 0183
    24         (1)  Interchange with SR 0222, Widen Bridge
    25             and Reconstruct Interchange                14,500,000
    26             (Base Project Allocation - $7,400,000)
    27             (Land Allocation - $4,600,000)
    28             (Design and Contingencies - $2,500,000)
    29         (2)  Intersection with SR 3055, Widen
    30             Bridge and Reconstruct Interchange          5,000,000
    19970S0185B0697                 - 10 -

     1             (Base Project Allocation - $3,500,000)
     2             (Land Allocation - $750,000)
     3             (Design and Contingencies - $750,000)
     4     (c)  US 222
     5         (1)  Reconstruct US 222 as a Four-Lane
     6             Limited Access Highway Between SR 3028
     7             (Warren Street Extension) in Cumru
     8             Township and the Existing US 222
     9             Expressway in Lancaster County             90,200,000
    10             (Base Project Allocation - $66,000,000)
    11             (Land Allocation - $17,200,000)
    12             (Design and Contingencies - $7,000,000)
    13         (2)  Intersection with SR 0073,
    14             Intersection Improvements                     903,000
    15             (Base Project Allocation - $628,000)
    16             (Land Allocation - $175,000)
    17             (Design and Contingencies - $100,000)
    18         (3)  Intersection with SR 0662,
    19             Intersection Improvements                     551,000
    20             (Base Project Allocation - $445,000)
    21             (Land Allocation - $51,000)
    22             (Design and Contingencies - $55,000)
    23     (d)  SR 0061
    24         (1)  SR 3055 to Schuylkill County Line, Add
    25             Lanes, Resurface and Shoulder
    26             Construction                               20,000,000
    27         (2)  SR 3055 to US 222, Widen Highway,
    28             Abolish Existing Railroad Overpass and
    29             Construct New Overpass                     20,000,000
    30     (e)  SR 2033
    19970S0185B0697                 - 11 -

     1         (1)  Shelbourne Road TR 422 and TR 562,
     2             Realignment                                 6,525,000
     3             (Base Project Allocation - $5,375,000)
     4             (Land Allocation - $400,000)
     5             (Design and Contingencies - $750,000)
     6     (f)  SR 3055
     7         (1)  Outer Bypass Rehabilitation, SR 0061
     8             to the End of Expressway,
     9             Rehabilitation                              4,400,000
    10             (Base Project Allocation - $2,400,000)
    11             (Land Allocation - $1,000,000)
    12             (Design and Contingencies - $1,000,000)
    13     (g)  SR 0737
    14         (1)  Widen and Reconstruct Between SR 0222
    15             and I-78                                    3,000,000
    16     (h)  Warren Street Extension
    17         (1)  Construct a New Four-Lane Limited
    18             Access Highway Connecting US 422 in the
    19             Borough of Wyomissing to US 222 in
    20             Cumru Township. The Proposed Highway
    21             would have Interchanges with US 422, PA
    22             724 and US 222                             72,500,000
    23             (Base Project Allocation - $45,500,000)
    24             (Land Allocation - $18,800,000)
    25             (Design and Contingencies - $8,200,000)
    26     (i)  SR 422
    27         (1)  Intersection with TR 662, Douglass
    28             Township, Relocation and Reconstruction
    29             of Intersection                             5,000,000
    30     (J)  KUTZTOWN UNIVERSITY                                       <--
    19970S0185B0697                 - 12 -

     1         (1)  CONSTRUCTION OF NEW ACCESS ROAD TO
     2             KUTZTOWN UNIVERSITY AND RELOCATION OF
     3             STATE ROAD                                  2,760,000
     4  Section 307.  Blair County.
     5     (a)  I-99
     6         (1)  Bedford County Line North to the
     7             Village of Bald Eagle, Roadway
     8             Rehabilitation and Safety Improvements      1,440,000
     9             (Base Project Allocation - $1,320,000)
    10             (Land Allocation - $60,000)
    11             (Design and Contingencies - $60,000)
    12         (2)  Construction of New Interchange with
    13             US 220 at Kettle Street to Juniata Gap
    14             Road at Chestnut Avenue                    90,000,000
    15             (Base Project Allocation - $79,000,000)
    16             (Land Allocation - $1,000,000)
    17             (Design and Contingencies -
    18             $10,000,000)
    19     (b)  SR 4027
    20         (1)  Reconstruction and/or Relocation in
    21             Tyrone Borough and Snyder Township          3,200,000
    22             (Base Project Allocation - $2,500,000)
    23             (Land Allocation - $200,000)
    24             (Design and Contingencies - $500,000)
    25     (c)  SR 4008
    26         (1)  Reconstruction of Horseshoe Curve Road
    27             from 40th Street and Board Avenue to US
    28             22 at Gallitzin Interchange in Cambria
    29             County                                      4,901,000
    30             (Base Project Allocation - $4,198,000)
    19970S0185B0697                 - 13 -

     1             (Land Allocation - $350,000)
     2             (Design and Contingencies - $353,000)
     3     (d)  Chestnut Avenue Extension
     4         (1)  Complete Construction of Chestnut
     5             Avenue Extension                           27,000,000
     6             (Base Project Allocation - $17,000,000)
     7             (Land Allocation - $5,000,000)
     8             (Design and Contingencies - $5,000,000)
     9  Section 308.  Bradford County.
    10     (a)  SR 14
    11         (1)  Canton Township, Intersection of PA 14
    12             and SR 3012, Village of Grover, 0.5
    13             Mile Reconstruction, Improve Horizontal
    14             Alignment and Intersection                  2,100,000
    15             (Base Project Allocation - $1,800,000)
    16             (Land Allocation - $100,000)
    17             (Design and Contingencies - $200,000)
    18  Section 309.  Bucks County.
    19     (a)  I-95
    20         (1)  Philadelphia County to New Jersey
    21             State Line, Pavement Rehabilitation and
    22             Safety Improvements                         1,900,000
    23             (Base Project Allocation - $1,700,000)
    24             (Land Allocation - $10,000)
    25             (Design and Contingencies - $190,000)
    26     (b)  SR 309
    27         (1)  County Line Road, Hilltown Township to
    28             Bethlehem Road, West Rockhill Township,
    29             Pavement Rehabilitation, Shoulders and
    30             Safety Improvements                         2,000,000
    19970S0185B0697                 - 14 -

     1             (Base Project Allocation - $1,500,000)
     2             (Land Allocation - $150,000)
     3             (Design and Contingencies - $350,000)
     4     (c)  SR 313
     5         (1)  New Galena Road, New Britain Township
     6             to Stump Road, New Britain Township,
     7             Install Truck Climbing Lane in
     8             Westbound Direction                           750,000
     9             (Base Project Allocation - $500,000)
    10             (Land Allocation - $150,000)
    11             (Design and Contingencies - $100,000)
    12     (d)  SR 332
    13         (1)  Newtown and Lower Makefield Townships,
    14             at Lindenhurst Road, SR 2069, Widening,
    15             Intersection Improvements and Highway
    16             Restoration                                 1,000,000
    17             (Base Project Allocation - $1,000,000)
    18  Section 310.  Butler County.
    19     (a)  US 422
    20         (1)  Intersection Improvements and
    21             Installation of New Traffic Signals at
    22             Intersection of US 422, SR 0038 and SR
    23             0068                                        8,000,000
    24         (2)  Restoration of US 422 in Muddycreek
    25             and Franklin Townships                     10,100,000
    26             (Base Project Allocation - $10,000,000)
    27             (Design and Contingencies - $100,000)
    28     (b)  Hansen Avenue
    29         (1)  Installation of New Traffic Signals at
    30             Hansen Avenue in Butler Township              160,000
    19970S0185B0697                 - 15 -

     1     (c)  SR 0068
     2         (1)  Installation of Traffic Signals at
     3             Intersection with Whitestown Road              50,000
     4         (2)  Installation of Traffic Signals at
     5             Intersection with Stevenson Road               50,000
     6     (d)  SR 0356
     7         (1)  Widen SR 0356 from Silverville Road to
     8             Riemer Road                                 5,000,000
     9     (e)  SR 0228
    10         (1)  Installation of Traffic Signals at
    11             Intersection with South Pike Road             200,000
    12         (2)  Restoration, Reconstruction and
    13             Widening of SR 228 from SR 3015 to SR 8
    14             South                                       9,700,000
    15             (Base Project Allocation - $8,000,000)
    16             (Land Allocation - $1,000,000)
    17             (Design and Contingencies - $700,000)
    18         (3)  Restoration, Reconstruction and
    19             Widening of SR 228 from SR 8 South to
    20             SR 356                                     21,500,000
    21             (Base Project Allocation - $18,000,000)
    22             (Land Allocation - $2,000,000)
    23             (Design and Contingencies - $1,500,000)
    24     (f)  South Pike Road
    25         (1)  Installation of Traffic Signals at
    26             Intersection with Monroe Road                 200,000
    27     (g)  SR 528
    28         (1)  Reconstruction of Existing Interchange
    29             in Jackson Township                         1,900,000
    30             (Base Project Allocation - $1,400,000)
    19970S0185B0697                 - 16 -

     1             (Land Allocation - $200,000)
     2             (Design and Contingencies - $300,000)
     3     (h)  SR 3025
     4         (1)  Reconstruction of Existing Interchange
     5             in Jackson Township                         4,100,000
     6             (Base Project Allocation - $3,500,000)
     7             (Land Allocation - $300,000)
     8             (Design and Contingencies - $300,000)
     9     (i)  SR 8
    10         (1)  Restoration and Reconstruction of SR 8
    11             South in City of Butler and Butler,
    12             Penn and Middlesex Townships               16,700,000
    13             (Base Project Allocation - $15,000,000)
    14             (Land Allocation - $1,000,000)
    15             (Design and Contingencies - $700,000)
    16  Section 311.  Cambria County.
    17     (a)  US 219
    18         (1)  Scalp Avenue to Davidsville, Pavement
    19             Restoration                                 1,392,000
    20             (Base Project Allocation - $1,312,000)
    21             (Design and Contingencies - $80,000)
    22     (b)  SR 4021
    23         (1)  Construct Access Road from SR 4021 to
    24             Hastings Area Industrial Park               1,300,000
    25     (c)  PA 56
    26         (1)  Haws Pike, Lower Yoder Township
    27             Roadway Rehabilitation and Safety
    28             Improvements                                  400,000
    29             (Base Project Allocation - $380,000)
    30             (Design and Contingencies - $20,000)
    19970S0185B0697                 - 17 -

     1  Section 312.  Cameron County (Reserved).
     2  Section 313.  Carbon County.
     3     (a)  I-80
     4         (1)  Harmony Lake to Monroe County,
     5             Pavement Rehabilitation and Safety
     6             Improvements                                  200,000
     7             (Base Project Allocation - $179,000)
     8             (Land Allocation - $1,000)
     9             (Design and Contingencies - $20,000)
    10         (2)  RECONSTRUCTION OF REST AREA ON                        <--
    11             WESTBOUND I-80 IN KIDDER TOWNSHIP           4,950,000
    12             (BASE PROJECT ALLOCATION - $2,700,000)
    13             (LAND ALLOCATION - $1,000,000)
    14             (DESIGN AND CONTINGENCIES - $1,250,000)
    15         (3)  CONSTRUCT NEW WEIGH STATION AT REST
    16             AREA ON WESTBOUND I-80 IN KIDDER
    17             TOWNSHIP                                      330,000
    18             (BASE PROJECT ALLOCATION - $300,000)
    19             (DESIGN AND CONTINGENCIES - $30,000)
    20     (B)  SR 248
    21         (1)  REHABILITATION AND RESTORATION OF SR
    22             248 FROM US 209 TO PALMERTON BOROUGH        1,900,000
    23             (BASE PROJECT ALLOCATION - $1,900,000)
    24         (2)  REHABILITATION AND RESTORATION OF SR
    25             248 FROM SR 895 TO NORTHAMPTON COUNTY
    26             LINE                                        2,300,000
    27             (BASE PROJECT ALLOCATION - $2,200,000)
    28             (LAND ALLOCATION - $50,000)
    29             (DESIGN AND CONTINGENCIES - $50,000)
    30     (C)  SR 2006
    19970S0185B0697                 - 18 -

     1         (1)  INTERSECTION IMPROVEMENTS AT
     2             INTERSECTION OF SR 2006 AND SR 2002 IN
     3             LOWER TOWAMENSING TOWNSHIP                  1,150,000
     4             (BASE PROJECT ALLOCATION - $850,000)
     5             (LAND ALLOCATION - $150,000)
     6             (DESIGN AND CONTINGENCIES - $150,000)
     7     (D)  SR 2015
     8         (1)  RESTORATION OF SR 2015 IN BOROUGH OF
     9             WEISSPORT                                     800,000
    10             (BASE PROJECT ALLOCATION - $400,000)
    11             (LAND ALLOCATION - $100,000)
    12             (DESIGN AND CONTINGENCIES - $300,000)
    13  Section 314.  Centre County.
    14     (a)  I-80
    15         (1)  Clearfield County Line to Clinton
    16             County, Pavement Rehabilitation and
    17             Safety Improvements                         3,300,000
    18             (Base Project Allocation - $2,953,000)
    19             (Land Allocation - $17,000)
    20             (Design and Contingencies - $330,000)
    21         (2)  Marion Township, Exit 24, Interchange
    22             Reconstruction                              1,560,000
    23             (Base Project Allocation - $1,500,000)
    24             (Design and Contingencies - $60,000)
    25         (3)  Boggs Township, Exit 23, Interchange
    26             Reconstruction                              1,160,000
    27             (Base Project Allocation - $1,100,000)
    28             (Design and Contingencies - $60,000)
    29     (b)  PA 504
    30         (1)  Phillipsburg Borough and Rush
    19970S0185B0697                 - 19 -

     1             Township, Cold Stream Run Bridge to
     2             Airport, Two-Lane Reconstruction              400,000
     3             (Base Project Allocation - $240,000)
     4             (Land Allocation - $60,000)
     5             (Design and Contingencies - $100,000)
     6     (c)  PA 350
     7         (1)  Climbing Lane and Two-Lane Relocation,
     8             North of Bald Eagle to Top of Sandy
     9             Ridge Mountain                              5,750,000
    10             (Base Project Allocation - $5,200,000)
    11             (Land Allocation - $150,000)
    12             (Design and Contingencies - $400,000)
    13  Section 315.  Chester County.
    14     (a)  SR 41
    15         (1)  Relocation of SR 41 in Southern
    16             Chester County                             10,000,000
    17             (Design and Contingencies -
    18             $10,000,000)
    19         (2)  Upgrade Intersection of SR 41 and SR
    20             796 in Londonderry Township                   665,000
    21             (Base Project Allocation - $600,000)
    22             (Land Allocation - $15,000)
    23             (Design and Contingencies - $50,000)
    24         (3)  Upgrade Intersection of SR 41 and Zook
    25             Road in West Sadsbury Township                665,000
    26             (Base Project Allocation - $600,000)
    27             (Land Allocation - $15,000)
    28             (Design and Contingencies - $50,000)
    29     (b)  US 1
    30         (1)  East Marlborough Township,
    19970S0185B0697                 - 20 -

     1             Transportation Partnership Overpass         3,000,000
     2             (Base Project Allocation - $2,500,000)
     3             (Land Allocation - $200,000)
     4             (Design and Contingencies - $300,000)
     5     (c)  SR 926
     6         (1)  Resurface, Widen, Install New Drainage
     7             and Improve Intersection Visibility
     8             from Route 352 to Route 202                   675,000
     9             (Base Project Allocation - $325,000)
    10             (Land Allocation - $125,000)
    11             (Design and Contingencies - $225,000)
    12     (d)  US 202
    13         (1)  Signalization of Southbound US 202
    14             Off-Ramp at Intersection with Paoli
    15             Pike, West Goshen Township                    335,000
    16             (Base Project Allocation - $250,000)
    17             (Design and Contingencies - $85,000)
    18         (2)  Engineering study of the capacity and
    19             potential safety improvements to the
    20             ramps, structures and roadway of US 202
    21             between US 30 and Swedesford Road
    22             interchange in East Whiteland               1,500,000
    23             (Design and Contingencies - $1,500,000)
    24     (e)  Paoli Pike
    25         (1)  Install New Storm Water Drainage
    26             System at Two Locations on Paoli Pike
    27             in Willistown Township                        482,000
    28             (Base Project Allocation - $450,000)
    29             (Design and Contingencies - $32,000)
    30     (f)  US 30
    19970S0185B0697                 - 21 -

     1         (1)  US 30, Coatesville-Downingtown Bypass,
     2             Preliminary Engineering Analysis for
     3             Update from SR 10 West of Coatesville
     4             to Exton Bypass                             1,000,000
     5  Section 316.  Clarion County (Reserved).
     6  Section 317.  Clearfield County.
     7     (a)  I-80
     8         (1)  Jefferson County Line to Centre County
     9             Line, Pavement Rehabilitation and
    10             Safety Improvements                         4,100,000
    11             (Base Project Allocation - $3,670,000)
    12             (Land Allocation - $20,000)
    13             (Design and Contingencies - $410,000)
    14     (b)  US 219
    15         (1)  SR 219 and SR 4019, South of Dubois,
    16             Add Two-Way Left Turn Lane                    188,000
    17             (Base Project Allocation - $138,000)
    18             (Land Allocation - $30,000)
    19             (Design and Contingencies - $20,000)
    20  Section 318.  Clinton County.
    21     (a)  I-80
    22         (1)  Centre County Line to Union County
    23             Line, Pavement Rehabilitation and
    24             Safety Improvements                         2,400,000
    25             (Base Project Allocation - $2,148,000)
    26             (Land Allocation - $12,000)
    27             (Design and Contingencies - $240,000)
    28  Section 319.  Columbia County.
    29     (a)  PA 54
    30         (1)  PA 54/61 and PA 42, Village of
    19970S0185B0697                 - 22 -

     1             Centralia, Restoration                        150,000
     2             (Base Project Allocation - $120,000)
     3             (Land Allocation - $6,000)
     4             (Design and Contingencies - $24,000)
     5     (b)  PA 487
     6         (1)  Knoebels Access Road, Franklin
     7             Township, Intersection and Access
     8             Improvements                                  300,000
     9             (Base Project Allocation - $180,000)
    10             (Land Allocation - $20,000)
    11             (Design and Contingencies - $100,000)
    12  Section 320.  Crawford County.
    13     (a)  I-79
    14         (1)  Northbound and Southbound Rest Areas
    15             (Sites 19 and 20), Sewage Treatment
    16             Plant Improvements, Length 0.5 Mile         1,150,000
    17             (Base Project Allocation - $1,000,000)
    18             (Design and Contingencies - $150,000)
    19     (b)  SR 8
    20         (1)  Intersection Improvements at SR 8 and
    21             SR 27 to Provide Additional Truck
    22             Turning Radii                                 205,000
    23             (Base Project Allocation - $160,000)
    24             (Land Allocation - $10,000)
    25             (Design and Contingencies - $35,000)
    26     (c)  SR 27
    27         (1)  Install New Signals at Intersections
    28             within City of Meadville                      275,000
    29             (Base Project Allocation - $225,000)
    30             (Land Allocation - $20,000)
    19970S0185B0697                 - 23 -

     1             (Design and Contingencies - $30,000)
     2         (2)  Various Corridor and Spot Improvements
     3             on SR 27 between Meadville and
     4             Titusville                                  7,000,000
     5             (Base Construction Allocation -
     6             $6,000,000)
     7             (Land Allocation - $400,000)
     8             (Design and Contingencies - $600,000)
     9     (d)  SR 77
    10         (1)  Various Corridor and Spot Improvements
    11             on SR 77, SR 408 and SR 1010 between
    12             Meadville and Titusville                    7,000,000
    13             (Base Construction Allocation - $
    14             6,000,000)
    15             (Land Allocation - $400,000)
    16             (Design and Contingencies - $600,000)
    17  Section 321.  Cumberland County.
    18     (a)  I-81
    19         (1)  Exit 12, Interchange with PA 465,
    20             Interchange Improvements                    1,520,000
    21             (Base Construction Allocation -
    22             $1,200,000)
    23             (Land Allocation - $20,000)
    24             (Design and Contingencies - $300,000)
    25  Section 322.  Dauphin County.
    26     (a)  I-283
    27         (1)  PA 441 to I-76, Pavement
    28             Rehabilitation and Safety Improvements        200,000
    29             (Base Project Allocation - $179,000)
    30             (Land Allocation - $1,000)
    19970S0185B0697                 - 24 -

     1             (Design and Contingencies - $20,000)
     2     (b)  PA 283
     3         (1)  I-283 to PA 341, Pavement
     4             Rehabilitation and Safety Improvements      6,962,000
     5             (Base Project Allocation - $6,500,000)
     6             (Land Allocation - $2,000)
     7             (Design and Contingencies - $460,000)
     8     (c)  US 22
     9         (1)  Construction of Pedestrian Tunnel or
    10             Overhead Crossing of US 22 near Manor
    11             Drive in West Hanover Township              3,250,000
    12             (Base Project Allocation - $3,000,000)
    13             (Land Allocation - $100,000)
    14             (Design and Contingencies - $150,000)
    15     (d)  Pleasant View Road
    16         (1)  Install New Signals and Reconstruct
    17             Highway-Railroad Grade Crossing on
    18             Pleasant View Road, South Hanover
    19             Township                                      190,000
    20             (Base Project Allocation - $150,000)
    21             (Land Allocation - $20,000)
    22             (Design and Contingencies - $20,000)
    23     (e)  I-81
    24         (1)  Installation of sound barriers on
    25             north and south sides of I-81 from
    26             intersection with I-83 to Mountain Road
    27             Interchange                                 5,300,000
    28             (Base Project Allocation - $5,000,000)
    29             (Design and Contingencies - $300,000)
    30     (f)  PA 225
    19970S0185B0697                 - 25 -

     1         (1)  Briardale Road to PA 325, Middle
     2             Paxton Township, Resurfacing                  116,000
     3             (Base Project Allocation - $116,000)
     4     (g)  PA 225
     5         (1)  South Road to Briardale Road, Middle
     6             Paxton Township, Widen to Three Lanes         111,000
     7             (Base Project Allocation - $111,000)
     8  Section 323.  Delaware County.
     9     (a)  US 30
    10         (1)  Ithan Avenue, Villanova University,
    11             Pedestrian Tunnel and Turn Lanes              600,000
    12             (Base Project Allocation - $600,000)
    13     (b)  I-95
    14         (1)  Install Sound Barriers on I-95 on East
    15             Side from SR 420 to SR 291                  2,100,000
    16             (Base Project Allocation - $2,000,000)
    17             (Design and Contingencies - $100,000)
    18     (c)  P & W Bike/Pedestrian Trail
    19         (1)  Radnor Township, Bikeway                     140,000
    20             (Base Project Allocation - $112,000)
    21             (Design and Contingencies - $28,000)
    22  Section 324.  Elk County.
    23     (a)  Osterhout Street
    24         (1)  From SR 120 Intersection to SR 219
    25             Intersection, Reconstruct to 24 Feet        3,585,000
    26             (Base Project Allocation - $2,500,000)
    27             (Land Allocation - $600,000)
    28             (Design and Contingencies - $485,000)
    29     (b)  Elk County Industrial Park Access Road
    30         (1)  SR 120, SR 255, SR 1001, SR 1002, SR
    19970S0185B0697                 - 26 -

     1             1003 and SR 1008, Reconstruct to 24
     2             Feet                                        2,882,000
     3             (Base Project Allocation - $2,632,000)
     4             (Land Allocation - $100,000)
     5             (Design and Contingencies - $150,000)
     6     (c)  US 219
     7         (1)  Relocation of Allegheny & Eastern
     8             Track to Allow for the Construction of
     9             a US 219 Bypass of Johnsonburg              5,100,000
    10             (Base Construction Allocation -
    11             $3,900,000)
    12             (Land Allocation - $1,000,000)
    13             (Design and Contingencies - $200,000)
    14  Section 325.  Erie County.
    15     (a)  SR 4024
    16         (1)  SR 4024 Extension, US 19 to Bush
    17             Industrial Road, Summit Township,
    18             Construct New Roadway and Intersection
    19             Improvements                                  620,000
    20             (Base Project Allocation - $400,000)
    21             (Land Allocation - $120,000)
    22             (Design and Contingencies - $100,000)
    23     (b)  I-79
    24         (1)  Crawford County Line to I-90 in Erie
    25             County, Pavement Rehabilitation and
    26             Safety Improvements                         1,900,000
    27             (Base Project Allocation - $1,700,000)
    28             (Land Allocation - $10,000)
    29             (Design and Contingencies - $190,000)
    30     (c)  SR 3006
    19970S0185B0697                 - 27 -

     1         (1)  From Bridge to Erie Street, Borough of
     2             Edinboro, Add Turn Lanes                       64,000
     3             (Base Project Allocation - $44,000)
     4             (Land Allocation - $10,000)
     5             (Design and Contingencies - $10,000)
     6     (d)  SR 4034
     7         (1)  City of Erie, East Side Access, Port
     8             Access Road to East 6th Street, new
     9             two-lane roadway                            1,176,000
    10             (Base Project Allocation - $647,000)
    11             (Land Allocation - $329,000)
    12             (Design and Contingencies - $200,000)
    13         (2)  City of Erie, East Side Access, East
    14             6th Street to East 12th Street, new
    15             two-lane roadway                              830,000
    16             (Base Project Allocation - $30,000)
    17             (Land Allocation - $440,000)
    18             (Design and Contingencies - $360,000)
    19         (3)  City of Erie, East Side Access, Port
    20             Access Road, Larson Text Right-of-Way
    21             Acquisition                                   200,000
    22             (Land Allocation - $200,000)
    23     (e)  SR 4016
    24         (1)  West 38th Street, Shunpike Road to
    25             Myrtle Street, Realignment/Relocation         940,000
    26             (Base Project Allocation - $800,000)
    27             (Land Allocation - $50,000)
    28             (Design and Contingencies - $90,000)
    29     (f)  SR 0299
    30         (1)  Millcreek Township, Powell Avenue
    19970S0185B0697                 - 28 -

     1             Relocation                                  6,300,000
     2             (Base Project Allocation - $4,700,000)
     3             (Land Allocation - $600,000)
     4             (Design and Contingencies - $1,000,000)
     5     (g)  SR 4024
     6         (1)  Summit Township, Robinson Road
     7             Extensions                                 11,300,000
     8             (Base Project Allocation - $9,800,000)
     9             (Land Allocation - $700,000)
    10             (Design and Contingencies - $800,000)
    11     (h)  SR 4026
    12         (1)  Millcreek Township, South Hill Road
    13             Extensions                                  6,200,000
    14             (Base Project Allocation - $4,800,000)
    15             (Land Allocation - $750,000)
    16             (Design and Contingencies - $650,000)
    17  Section 326.  Fayette County.
    18     (a)  SR 21
    19         (1)  SR 21 from Uniontown to Masontown,
    20             Safety Improvements                         2,000,000
    21             (Design and Contingencies - $2,000,000)
    22     (b)  SR 711
    23         (1)  SR 711 in Connellsville, Safety
    24             Improvements                                  400,000
    25             (Design and Contingencies - $400,000)
    26  Section 327.  Forest County.
    27     (a)  SR 666
    28         (1)  Beaver Run Bridge to Whig Hill
    29             Highway, Restoration                          980,000
    30             (Base Project Allocation - $800,000)
    19970S0185B0697                 - 29 -

     1             (Land Allocation - $30,000)
     2             (Design and Contingencies - $150,000)
     3         (2)  Whig Hill to Little Minister Run
     4             Bridge, Restoration                         1,380,000
     5             (Base Project Allocation - $1,200,000)
     6             (Land Allocation - $30,000)
     7             (Design and Contingencies - $150,000)
     8         (3)  East of Upper Sheriff Creek to West of
     9             Porcupine Run Bridge, Restoration           2,230,000
    10             (Base Project Allocation - $2,000,000)
    11             (Land Allocation - $30,000)
    12             (Design and Contingencies - $200,000)
    13         (4)  West of Porcupine Run Bridge to Bobbs
    14             Creek Bridge, Restoration                   1,530,000
    15             (Base Project Allocation - $1,300,000)
    16             (Land Allocation - $30,000)
    17             (Design and Contingencies - $200,000)
    18         (5)  Bobbs Creek Bridge to Little Minister
    19             Run Bridge, Restoration                     1,230,000
    20             (Base Project Allocation - $1,000,000)
    21             (Land Allocation - $30,000)
    22             (Design and Contingencies - $200,000)
    23         (6)  Village of Lynch to Village of Whig
    24             Hill, Howe and Kingsley Townships,
    25             Reconstruction                             16,500,000
    26             (Base Project Allocation - $14,000,000)
    27             (Land Allocation - $1,000,000)
    28             (Design and Contingencies - $1,500,000)
    29  Section 328.  Franklin County (Reserved).
    30  Section 329.  Fulton County.
    19970S0185B0697                 - 30 -

     1     (a)  I-70
     2         (1)  Warfordsburg to Deneen Gap,
     3             Rehabilitation and Safety Improvements        637,000
     4             (Base Project Allocation - $607,000)
     5             (Design and Contingencies - $30,000)
     6     (B)  SR 1001                                                   <--
     7         (1)  RECONSTRUCTION OF INTERSECTION OF SR
     8             0016 AND SR 1001 AND CITO ROAD BETWEEN
     9             INTERSECTION AND A POINT ONE MILE SOUTH
    10             OF INTERSECTION                             2,000,000
    11             (BASE PROJECT ALLOCATION - $1,600,000)
    12             (LAND ALLOCATION - $100,000)
    13             (DESIGN AND CONTINGENCIES - $300,000)
    14  Section 330.  Greene County.
    15     (a)  I-79
    16         (1)  1 Mile North of Kirby to 3 Miles South
    17             of Waynesburg, Whiteley Township,
    18             Resurfacing                                   360,000
    19             (Base Project Allocation - $340,000)
    20             (Design and Contingencies - $20,000)
    21     (b)  I-79
    22         (1) 3 Miles South of Waynesburg to
    23             Waynesburg, Franklin Township,
    24             Resurfacing                                   500,000
    25             (Base Project Allocation - $440,000)
    26             (Design and Contingencies - $60,000)
    27  Section 331.  Huntingdon County.
    28     (a)  SR 26
    29         (1)  Huntingdon Borough and Oneida, Miller,
    30             Jackson and Barree Townships, Isolated
    19970S0185B0697                 - 31 -

     1             Improvements along 22 Miles of SR 26,
     2             Including Reconstruction and Widening
     3             of Pavement, Realignment, Intersection
     4             Improvements and Truck Climbing Lanes,
     5             to Upgrade Highway to Current
     6             Standards                                  25,500,000
     7             (Base Project Allocation - $20,500,000)
     8             (Land Allocation - $2,000,000)
     9             (Design and Contingencies - $3,000,000)
    10         (2)  Reconstruction and Corridor
    11             Improvements from Huntingdon Borough to
    12             Centre County Line                         25,000,000
    13             (Base Project Allocation - $20,500,000)
    14             (Land Allocation - $2,000,000)
    15             (Design and Contingencies - $2,500,000)
    16     (b)  SR 944
    17         (1)  Engineering and Land Acquisition from
    18             Intersection of SR 944 to Village of
    19             Cooks                                         600,000
    20             (Land Allocation - $100,000)
    21             (Design and Contingencies - $500,000)
    22  Section 332.  Indiana County (Reserved).
    23  Section 333.  Jefferson County.
    24     (a)  I-80
    25         (1)  Milepost 91 to Clearfield County Line,
    26             Pavement Rehabilitation and Safety
    27             Improvements                                  500,000
    28             (Base Project Allocation - $447,000)
    29             (Land Allocation - $3,000)
    30             (Design and Contingencies - $50,000)
    19970S0185B0697                 - 32 -

     1         (2)  Exit 15, Railroad Overpass to
     2             Westbound Roadside Rest, Interstate
     3             Preventative Maintenance                    3,580,000
     4             (Base Project Allocation - $3,500,000)
     5             (Design and Contingencies - $80,000)
     6  Section 334.  Juniata County (Reserved).
     7  Section 335.  Lackawanna County.
     8     (a)  I-81
     9         (1)  Various routes in Lackawanna and
    10             Luzerne Counties, in the Vicinity of
    11             Scranton and Wilkes-Barre, Intelligent
    12             Transportation Systems Study                   80,000
    13             (Design and Contingencies - $80,000)
    14         (2)  Luzerne County Line to Susquehanna
    15             County Line, Pavement Rehabilitation
    16             and Safety Improvements                     2,700,000
    17             (Base Project Allocation - $2,416,000)
    18             (Land Allocation - $14,000)
    19             (Design and Contingencies - $270,000)
    20         (3)  Reconstruction of I-81 and Davis
    21             Street Interchange to Increase Length
    22             of Entrance and Exit Ramps                  5,000,000
    23             (Base Project Allocation - $4,600,000)
    24             (Land Allocation - $300,000)
    25             (Design and Contingencies - $100,000)
    26     (b)  I-84
    27         (1)  I-81 to Wayne County Line, Pavement
    28             Rehabilitation and Safety Improvements      1,200,000
    29             (Base Project Allocation - $1,074,000)
    30             (Land Allocation - $6,000)
    19970S0185B0697                 - 33 -

     1             (Design and Contingencies - $120,000)
     2     (c)  I-380
     3         (1)  I-84 to Monroe County Line, Pavement
     4             Rehabilitation and Safety Improvements      1,000,000
     5             (Base Project Allocation - $895,000)
     6             (Land Allocation - $5,000)
     7             (Design and Contingencies - $100,000)
     8     (d)  US 6 and US 11
     9         (1)  Construction of Clarks Summit Bypass      25,000,000
    10             (Base Project Allocation - $24,000,000)
    11             (Design and Contingencies - 1,000,000)
    12         (2)  Construction of Turning Lanes in South
    13             Abington Township                           1,100,000
    14             (Base Project Allocation - $1,000,000)
    15             (Design and Contingencies - $100,000)
    16     (e)  SR 632
    17         (1)  Reconstruction and Drainage
    18             Improvements, South Abington Township         350,000
    19             (Base Project Allocation - $300,000)
    20             (Design and Contingencies - $50,000)
    21     (f)  Shady Lane Road
    22         (1)  Widen Railroad Tunnel                      2,000,000
    23             (Base Project Allocation - $1,800,000)
    24             (Design and Contingencies - $200,000)
    25     (g)  Keyser - Milwaukee Road
    26         (1)  Reconstruction of Road from Main
    27             Street to Oak Street                          250,000
    28             (Base Project Allocation - $225,000)
    29             (Design and Contingencies - $25,000)
    30  Section 336.  Lancaster County.
    19970S0185B0697                 - 34 -

     1     (a)  PA 23
     2         (1)  US 30 to Berks County Line, Pavement
     3             Rehabilitation and Safety Improvements      2,200,000
     4             (Base Project Allocation - $2,000,000)
     5             (Design and Contingencies - $200,000)
     6         (2)  FOUR LANE RELOCATION ENVIRONMENTAL                    <--
     7             IMPACT STUDY                                1,000,000
     8             (DESIGN AND CONTINGENCIES - $1,000,000)
     9         (3)  US 30 TO BERKS COUNTY LINE, FOUR LANE
    10             RELOCATION OF PA 23                        60,000,000
    11         (4)  ENVIRONMENTAL IMPACT STUDY                 1,000,000
    12     (b)  PA 322
    13         (1)  Farmersville Road to PA 897, Pavement
    14             Rehabilitation, Widen Shoulder and
    15             Safety Improvements                         1,320,000
    16             (Base Project Allocation - $1,200,000)
    17             (Design and Contingencies - $120,000)
    18     (c)  PA 372
    19         (1)  Oak Bottom Road to Germantown Avenue,
    20             Pavement Rehabilitation and Safety
    21             Improvements                                2,200,000
    22             (Base Project Allocation - $2,000,000)
    23             (Design and Contingencies - $200,000)
    24     (d)  PA 896
    25         (1)  US 30 to Strasburg Borough, Pavement
    26             Rehabilitation, Widen Shoulder and
    27             Safety Improvements                         1,980,000
    28             (Base Project Allocation - $1,800,000)
    29             (Design and Contingencies - $180,000)
    30         (2)  Strasburg Borough to PA 372, Valley
    19970S0185B0697                 - 35 -

     1             Road, Pavement Rehabilitation and
     2             Safety Improvements                         2,338,000
     3             (Base Project Allocation - $2,126,000)
     4             (Design and Contingencies - $212,000)
     5     (e)  PA 897
     6         (1)  Amish Road to Adamstown Road, Pavement
     7             Rehabilitation and Safety Improvements      3,850,000
     8             (Base Project Allocation - $3,500,000)
     9             (Design and Contingencies - $350,000)
    10     (f)  US 30
    11         (1)  US 222 to PA 340                           3,000,000
    12             (Design and Contingencies - $3,000,000)
    13         (2)  PA 741 to PA 72                            3,000,000
    14             (Design and Contingencies - $3,000,000)
    15         (3)  PA 896 to PA 897                           3,000,000
    16             (Design and Contingencies - $3,000,000)
    17         (4)  PA 896 to PA 41, Environmental Impact
    18             Study                                       1,000,000
    19             (Design and Contingencies - $1,000,000)
    20         (5)  WIDEN TO FIVE LANES BETWEEN PA 896 TO                 <--
    21             PA 41                                      10,000,000
    22         (6)  INTERSECTION IMPROVEMENTS ON PARALLEL
    23             ROADS TO ALLEVIATE CONGESTION PRIOR TO
    24             AND DURING RECONSTRUCTION                   1,000,000
    25     (g)  SR 2015
    26         (1)  Strasburg Borough to PA 372, Pavement
    27             Rehabilitation and Safety Improvements      2,860,000
    28             (Base Project Allocation - $2,600,000)
    29             (Design and Contingencies - $260,000)
    30     (h)  SR 2040
    19970S0185B0697                 - 36 -

     1         (1)  Paradise Lane to PA 741, Pavement
     2             Rehabilitation and Safety Improvements        671,000
     3             (Base Project Allocation - $610,000)
     4             (Design and Contingencies - $61,000)
     5     (i)  SR 3017
     6         (1)  PA 462 to Harrisburg Pike, Pavement
     7             Rehabilitation and Safety Improvements      7,700,000
     8             (Base Project Allocation - $7,000,000)
     9             (Design and Contingencies - $700,000)
    10     (j)  PA 41
    11         (1)  PA 926 to US 30, Major Investment
    12             Study                                         500,000
    13             (Design and Contingencies - $500,000)
    14     (K)  PA 72/PA 501 CORRIDOR                                     <--
    15         (1)  CONSTRUCTION OF MANHEIM RELIEF ROUTE       3,400,000
    16         (2)  CONSTRUCTION OF EAST PETERSBURG RELIEF
    17             ROUTE                                       2,400,000
    18         (3)  WIDEN PA 72 FROM PA 283 TO MILLER
    19             ROAD                                        4,000,000
    20     (L)  AIRPORT ROAD
    21         (1)  RELOCATE AND REALIGN AIRPORT ROAD IN
    22             MANHEIM TOWNSHIP                              300,000
    23  Section 337.  Lawrence County (Reserved).
    24  Section 338.  Lebanon County.
    25     (a)  I-81
    26         (1)  I-78 to Schuylkill County Line,
    27             Pavement Rehabilitation and Safety
    28             Improvements                                1,500,000
    29             (Base Project Allocation - $1,342,000)
    30             (Land Allocation - $8,000)
    19970S0185B0697                 - 37 -

     1             (Design and Contingencies - $150,000)
     2     (b)  US 322
     3         (1)  PA 934/241 to PA 419, Intersection
     4             Improvements                                  456,000
     5             (Base Project Allocation - $410,000)
     6             (Land Allocation - $28,000)
     7             (Design and Contingencies - $18,000)
     8     (c)  SR 0897
     9         (1)  From SR 0501 West and Southwest beyond
    10             intersection with SR 0419, Heidelberg
    11             Township, reconstruct roadway              12,000,000
    12             (Base Construction Allocation -
    13             $12,000,000)
    14     (d)  I-78
    15         (1)  Construction of complete interchange
    16             at intersection of I-78 and SR 343 in
    17             Bethel Township                            12,000,000
    18             (Base Construction Allocation -
    19             $8,000,000)
    20             (Land Allocation - $2,000,000)
    21             (Design and Contingencies - $2,000,000)
    22     (e)  SR 501
    23         (1)  Construction of bypass of SR 501 on
    24             the west side of Schafferstown from
    25             Main Street to vicinity of Michter's
    26             Road, Heidelberg Township                   8,000,000
    27             (Base Construction Allocation -
    28             $6,000,000)
    29             (Land Allocation - $1,000,000)
    30             (Design and Contingencies - $1,000,000)
    19970S0185B0697                 - 38 -

     1  Section 339.  Lehigh County.
     2     (a)  SR 1017 and SR 1008
     3         (1)  Reconstruct and Improve Mauch Chunk
     4             Road, Schadt Avenue and Rural Road in
     5             Whitehall Township                          1,073,000
     6             (Base Project Allocation - $774,000)
     7             (Land Allocation - $120,000)
     8             (Design and Contingencies - $179,000)
     9     (b)  SR 3017
    10         (1)  Widening to four lanes from Industrial
    11             Drive to City Line Road, Hanover
    12             Township                                    2,462,000
    13             (Base Project Allocation - $1,610,000)
    14             (Land Allocation - $572,000)
    15             (Design and Contingencies - $280,000)
    16         (2)  Widening to four lanes from City Line
    17             Road to Race Street Extension, Hanover
    18             Township                                    2,720,000
    19             (Base Project Allocation - $2,036,000)
    20             (Land Allocation - $404,000)
    21             (Design and Contingencies - $280,000)
    22     (c)  SR 1004
    23         (1)  Extend four lanes from SR 0987 to SR
    24             3017, Catasauqua Borough                    2,892,000
    25             (Base Project Allocation - $926,000)
    26             (Land Allocation - $1,560,000)
    27             (Design and Contingencies - $406,000)
    28         (2)  Widen to four lanes from SR 0987 to
    29             Willowbrook Road, Hanover Township          2,770,000
    30             (Base Project Allocation - $1,540,000)
    19970S0185B0697                 - 39 -

     1             (Land Allocation - $948,000)
     2             (Design and Contingencies - $282,000)
     3     (d)  SR 0987
     4         (1)  Widen to four lanes from Avenue A to
     5             SR 3017, Catasauqua Borough                 3,660,000
     6             (Base Project Allocation - $2,842,000)
     7             (Land Allocation - $418,000)
     8             (Design and Contingencies - $400,000)
     9         (2)  WIDENING OF SCHOENERSVILLE AND AIRPORT                <--
    10             ROADS, EXTENSION OF RACE STREET,
    11             REALIGNMENT OF AIRPORT ROAD/RACE STREET
    12             INTERSECTION IN HANOVER TOWNSHIP            4,066,000
    13             (BASE PROJECT ALLOCATION - $3,466,000)
    14             (LAND ALLOCATION - $600,000)
    15  Section 340.  Luzerne County.
    16     (a)  I-80
    17         (1)  White Haven to Carbon County Line,
    18             Pavement Rehabilitation and Safety
    19             Improvements                                  101,000
    20             (Base Project Allocation - $90,000)
    21             (Land Allocation - $1,000)
    22             (Design and Contingencies - $10,000)
    23     (b)  I-81
    24         (1)  Schuylkill County Line to I-80,
    25             Pavement Rehabilitation and Safety
    26             Improvements                                1,200,000
    27             (Base Project Allocation - $1,074,000)
    28             (Land Allocation - $6,000)
    29             (Design and Contingencies - $120,000)
    30         (2)  PA 29 to Lackawanna County Line,
    19970S0185B0697                 - 40 -

     1             Pavement Rehabilitation and Safety
     2             Improvements                                1,400,000
     3             (Base Project Allocation - $1,253,000)
     4             (Land Allocation - $7,000)
     5             (Design and Contingencies - $140,000)
     6     (c)  SR 2007
     7         (1)  Reconstruction of Northampton Street
     8             and SR 6309 at the Interchange of SR
     9             2007 and SR 6309                              900,000
    10             (Base Project Allocation - $750,000)
    11             (Land Allocation - $50,000)
    12             (Design and Contingencies - $100,000)
    13  Section 341.  Lycoming County.
    14     (a)  SR 220
    15         (1)  Shrewsbury Township, SR 220 North of
    16             Tivoli to T-650, Raise Grade to Reduce
    17             Flooding                                      750,000
    18             (Base Project Allocation - $600,000)
    19             (Land Allocation - $50,000)
    20             (Design and Contingencies - $100,000)
    21         (2)  Shrewsbury Township, SR 220 South of
    22             Glen Mawr to SR 2083, 0.7 Mile
    23             Reconstruction, Improve Horizontal and
    24             Vertical Alignment                          1,250,000
    25             (Base Project Allocation - $1,000,000)
    26             (Land Allocation - $50,000)
    27             (Design and Contingencies - $200,000)
    28         (3)  Shrewsbury Township, SR 220 North of
    29             Glen Mawr to Former LR 41035 Turnback
    30             Route, 0.3 Mile Reconstruction                720,000
    19970S0185B0697                 - 41 -

     1             (Base Project Allocation - $600,000)
     2             (Land Allocation - $20,000)
     3             (Design and Contingencies - $100,000)
     4         (4)  Spot improvements in Shrewsbury and
     5             Penn Townships, Lycoming County and
     6             Davidson Township, Sullivan County          9,250,000
     7             (Base Project Allocation - $8,000,000)
     8             (Land Allocation - $250,000)
     9             (Design and Contingencies - $1,000,000)
    10     (b)  SR 405
    11         (1)  Muncy Creek Township, SR 405, East of
    12             Muncy between I-180 and PA 405/PA 442
    13             Intersection, 0.5 Mile Reconstruction,
    14             Raise Grade to Reduce Flooding                950,000
    15             (Base Project Allocation - $800,000)
    16             (Land Allocation - $50,000)
    17             (Design and Contingencies - $100,000)
    18         (2)  I-180 to PA 405, Muncy Creek Township,
    19             reconstruction to reduce recurrent
    20             flooding                                      950,000
    21             (Base Project Allocation - $800,000)
    22             (Land Allocation - $50,000)
    23             (Design and Contingencies - $100,000)
    24     (C)  I-180                                                     <--
    25         (1)  WILLIAMSPORT BELTWAY, PAVEMENT
    26             REHABILITATION                                550,000
    27             (BASE PROJECT ALLOCATION - $500,000)
    28             (DESIGN AND CONTINGENCIES - $50,000)
    29         (2)  CONSTRUCTION OF LYCOMING MALL
    30             INTERCHANGE AND RELATED ROAD NETWORK
    19970S0185B0697                 - 42 -

     1             IMPROVEMENTS                               13,400,000
     2             (BASE PROJECT ALLOCATION - $8,600,000)
     3             (LAND ALLOCATION - $3,600,000)
     4             (DESIGN AND CONTINGENCIES - $1,200,000)
     5     (D)  WILLIAMSPORT REGIONAL AIRPORT ACCESS ROAD
     6         (1)  CONSTRUCTION OF A NEW TWO LANE ACCESS
     7             ROAD FROM THE WANNERSVILLE ROAD
     8             INTERCHANGE OF I-180 TO THE
     9             WILLIAMSPORT REGIONAL AIRPORT              15,000,000
    10             (BASE PROJECT ALLOCATION - $12,500,000)
    11             (LAND ALLOCATION - $250,000)
    12             (DESIGN AND CONTINGENCIES - $2,000,000)
    13  Section 342.  McKean County (Reserved).
    14  Section 343.  Mercer County.
    15     (a)  I-79
    16         (1)  Lawrence County Line to Crawford
    17             County Line, Pavement Rehabilitation
    18             and Safety Improvements                     2,600,000
    19             (Base Project Allocation - $2,327,000)
    20             (Land Allocation - $13,000)
    21             (Design and Contingencies - $260,000)
    22     (b)  I-80
    23         (1)  PA 173 to Venango County Line, Safety
    24             Improvements and Pavement
    25             Rehabilitation, Length 4.0 Miles           12,600,000
    26             (Base Project Allocation - $12,000,000)
    27             (Design and Contingencies - $600,000)
    28     (c)  PA 208
    29         (1)  From PA 258 to Old Route 258,
    30             Including Bridge over I-79, Widen to 48
    19970S0185B0697                 - 43 -

     1             Feet                                       14,700,000
     2             (Base Construction Allocation -
     3             $12,500,000)
     4             (Land Allocation - $1,000,000)
     5             (Design and Contingencies - $1,200,000)
     6     (D)  SR 60                                                     <--
     7         (1)  BRIDGE REHABILITATION AND INTERCHANGE
     8             IMPROVEMENT AT SR 318                       4,080,000
     9             (BASE PROJECT ALLOCATION - $3,800,000)
    10             (LAND ALLOCATION - $80,000)
    11             (DESIGN AND CONTINGENCIES - $200,000)
    12  Section 344.  Mifflin County (Reserved).
    13  Section 345.  Monroe County.
    14     (a)  I-80
    15         (1)  Carbon County Line to PA 115, Pavement
    16             Rehabilitation and Safety Improvements        100,000
    17             (Base Project Allocation - $89,000)
    18             (Land Allocation - $1,000)
    19             (Design and Contingencies - $10,000)
    20         (2)  Construction of Full Interchange at I-
    21             80, Exit 44 to Connect with US 611         13,000,000
    22             (Base Construction Allocation -
    23             $10,000,000)
    24             (Land Allocation - $2,000,000)
    25             (Design and Contingencies - $1,000,000)
    26     (b)  SR 115
    27         (1)  From I-80, at Exit 43, South
    28             Approximately 3.5 Miles to Long Pond
    29             Road, Stabilize and Widen Shoulders        11,000,000
    30             (Base Project Allocation - $10,500,000)
    19970S0185B0697                 - 44 -

     1             (Design and Contingencies - $500,000)
     2     (C)  SR 209                                                    <--
     3         (1)  CONSTRUCTION OF 4-LANE DIVIDED
     4             RELOCATION OF SR 209 AT INTERSECTION
     5             WITH SR 402 IN SMITHFIELD TOWNSHIP         49,500,000
     6             (BASE PROJECT ALLOCATION - $35,000,000)
     7             (LAND ALLOCATION - $10,000,000)
     8             (DESIGN AND CONTINGENCIES - $4,500,000)
     9         (2)  TRANSPORTATION STUDY FOR POSSIBLE
    10             MARSHALLS CREEK BYPASS                        300,000
    11             (DESIGN AND CONTINGENCIES - $300,000)
    12     (D)  SR 611
    13         (1)  WIDEN TO 64 FEET BETWEEN T-535 AND T-
    14             537 IN POCONO TOWNSHIP                      2,600,000
    15             (BASE PROJECT ALLOCATION - $2,000,000)
    16             (LAND ALLOCATION - $500,000)
    17             (DESIGN AND CONTINGENCIES - $100,000)
    18         (2)  RESTORATION OF SR 611 BETWEEN SCOTRUN
    19             AND SWIFTWATER, POCONO TOWNSHIP             2,010,000
    20             (BASE CONSTRUCTION ALLOCATION -
    21             $2,000,000)
    22             (DESIGN AND CONTINGENCIES - $10,000)
    23     (E)  POCONO SCENIC VISTAS
    24         (1)  CONSTRUCTION OF POCONO SCENIC VISTAS
    25             IN THE LONG POND AREA                       1,250,000
    26             (BASE PROJECT ALLOCATION - $100,000)
    27             (LAND ALLOCATION - $1,050,000)
    28             (DESIGN AND CONTINGENCIES - $100,000)
    29  Section 346.  Montgomery County.
    30     (a)  Souder Road
    19970S0185B0697                 - 45 -

     1         (1)  Reconstruct Portion of Souder Road to
     2             Remove Curves in Franconia Township           540,000
     3             (Base Project Allocation - $400,000)
     4             (Land Allocation - $100,000)
     5             (Design and Contingencies - $40,000)
     6     (b)  SR 0029
     7         (1)  Collegeville Borough, SR 0029
     8             realignment between Main Street and 1st
     9             Avenue                                      1,900,000
    10             (Base Project Allocation - $750,000)
    11             (Land Allocation - $950,000)
    12             (Design and Contingencies - $200,000)
    13     (c)  PA 23
    14         (1)  River Road at Balligomingo, West
    15             Conshohocken Township, Roadway
    16             Relocation and Resignalization                424,000
    17             (Base Project Allocation - $400,000)
    18             (Land Allocation - $24,000)
    19     (d)  PA 463
    20         (1)  US 611 to PA 152, Horsham Township,
    21             Intersection Improvements, Widening and
    22             Restoration                                   830,000
    23             (Base Project Allocation - $650,000)
    24             (Land Allocation - $55,000)
    25             (Design and Contingencies - $125,000)
    26  Section 347.  Montour County.
    27     (a)  I-80
    28         (1)  Northumberland County Line to Columbia
    29             County Line, Pavement Rehabilitation
    30             and Safety Improvements                     1,100,000
    19970S0185B0697                 - 46 -

     1             (Base Project Allocation - $984,000)
     2             (Land Allocation - $6,000)
     3             (Design and Contingencies - $110,000)
     4  Section 348.  Northampton County.
     5     (a)  I-78
     6         (1)  Lehigh County Line to PA 412, Pavement
     7             Rehabilitation and Safety Improvements        300,000
     8             (Base Project Allocation - $268,000)
     9             (Land Allocation - $2,000)
    10             (Design and Contingencies - $30,000)
    11  Section 349.  Northumberland County.
    12     (a)  I-80
    13         (1)  PA 254 to Montour County Line,
    14             Pavement Rehabilitation and Safety
    15             Improvements                                  100,000
    16             (Base Project Allocation - $89,000)
    17             (Land Allocation - $1,000)
    18             (Design and Contingencies - $10,000)
    19     (b)  T-577, Marsh Drive
    20         (1)  Access Road and Related Improvement in
    21             Milton Borough and West Chillisquaque
    22             Township                                    1,600,000
    23             (Base Project Allocation - $1,100,000)
    24             (Land Allocation - $300,000)
    25             (Design and Contingencies - $200,000)
    26     (c)  I-80
    27         (1)  Milepost 207 to Milepost 214,
    28             Restoration                                   600,000
    29             (Design and Contingencies - $600,000)
    30  Section 350.  Perry County.
    19970S0185B0697                 - 47 -

     1     (a)  SR 17
     2         (1)  Resurface and Construct Shoulder on SR
     3             17 from Jackson Township through
     4             Saville Township                            1,080,000
     5             (Base Project Allocation - $1,000,000)
     6             (Design and Contingencies - $80,000)
     7     (b)  SR 233
     8         (1)  Resurface and Construct Shoulder on SR
     9             233 from Green Park, Tyrone Township to
    10             Cumberland County Line                        620,000
    11             (Base Project Allocation - $600,000)
    12             (Design and Contingencies - $20,000)
    13     (c)  SR 274
    14         (1)  Resurface and Construct Shoulder on SR
    15             274 from Blain, Jackson Township, to
    16             Franklin County Line                          820,000
    17             (Base Project Allocation - $800,000)
    18             (Design and Contingencies - $20,000)
    19     (d)  SR 849
    20         (1)  Resurface and Construct Shoulder from
    21             Newport to SR 34                              930,000
    22             (Base Project Allocation - $900,000)
    23             (Design and Contingencies - $30,000)
    24     (e)  SR 850
    25         (1)  Resurface and Construct Shoulder on SR
    26             850 from Kistler to Juniata County
    27             Line                                          570,000
    28             (Base Project Allocation - $520,000)
    29             (Design and Contingencies - $50,000)
    30         (2)  Resurface and Construct Shoulder on SR
    19970S0185B0697                 - 48 -

     1             850 from SR 34 in Shermans Dale to
     2             Village of Keystone                           410,000
     3             (Base Project Allocation - $400,000)
     4             (Design and Contingencies - $10,000)
     5  Section 351.  Philadelphia County.
     6     (a)  I-76
     7         (1)  Route 1 to I-95, Pavement
     8             Rehabilitation and Safety Improvements      1,000,000
     9             (Base Project Allocation - $895,000)
    10             (Land Allocation - $5,000)
    11             (Design and Contingencies - $100,000)
    12     (b)  I-95
    13         (1)  Delaware County Line to Bucks County
    14             Line, Pavement and Bridge
    15             Rehabilitation and Safety Improvements     26,440,000
    16             (Base Project Allocation - $25,340,000)
    17             (Land Allocation - $100,000)
    18             (Design and Contingencies - $1,000,000)
    19     (c)  Germantown Avenue
    20         (1)  Reconstruct Germantown Avenue              7,500,000
    21     (d)  SR 1007
    22         (1)  Adams Avenue Connector, Torresdale to
    23             Aramingo Avenue, New Roadway                  376,000
    24             (Base Project Allocation - $286,000)
    25             (Land Allocation - $70,000)
    26             (Design and Contingencies - $20,000)
    27     (e)  I-95
    28         (1)  Jackson Street to Ritner Avenue, (200
    29             Block of Front Street), Install
    30             Safety/Protective Wall                         44,000
    19970S0185B0697                 - 49 -

     1             (Base Project Allocation - $35,000)
     2             (Design and Contingencies - $9,000
     3     (F)  CHESTNUT STREET                                           <--
     4         (1)  CHESTNUT STREET INTERMODAL IMPROVEMENT
     5             PROJECT                                     4,367,000
     6  Section 352.  Pike County (Reserved).
     7  Section 353.  Potter County.
     8     (a)  SR 2002
     9         (1)  Reconstruct to 22 Feet from Germania
    10             Station to Galeton                          2,595,000
    11             (Base Project Allocation - $2,157,000)
    12             (Land Allocation - $250,000)
    13             (Design and Contingencies - $188,000)
    14  Section 354.  Schuylkill County.
    15     (a)  I-81
    16         (1)  PA 25 to PA 54, Pavement
    17             Rehabilitation and Safety Improvements      2,000,000
    18             (Base Project Allocation - $1,790,000)
    19             (Land Allocation - $10,000)
    20             (Design and Contingencies - $200,000)
    21         (2)  PA 901 Interchange, Reconstruction           800,000
    22             (Base Project Allocation - $716,000)
    23             (Land Allocation - $4,000)
    24             (Design and Contingencies - $80,000)
    25         (3)  SR 4007, Gordon Road, New Interchange      1,600,000
    26             (Base Project Allocation - $1,432,000)
    27             (Land Allocation - $8,000)
    28             (Design and Contingencies - $160,000)
    29         (4)  CONSTRUCTION OF A NEW REST AREA ON I-                 <--
    30             81 NORTHBOUND IN FOSTER TOWNSHIP            6,240,000
    19970S0185B0697                 - 50 -

     1             (BASE PROJECT ALLOCATION - $3,900,000)
     2             (LAND ALLOCATION - $1,475,000)
     3             (DESIGN AND CONTINGENCIES - $865,000)
     4     (b)  SR 125
     5         (1)  Resurface and Reconstruct SR 125 from
     6             SR 25 to Northumberland County Line           825,000
     7             (Base Project Allocation - $750,000)
     8             (Design and Contingencies - $75,000)
     9     (c)  SR 309
    10         (1)  Intersection Improvements with SR 443,
    11             West Penn Township                          1,050,000  <--
    12             (Base Project Allocation - $1,000,000)
    13             WEST PENN TOWNSHIP                          2,050,000  <--
    14             (BASE PROJECT ALLOCATION - $2,000,000)
    15             (Land Allocation - $40,000)
    16             (Design and Contingencies - $10,000)
    17         (2)  Corridor Study of SR 309                     250,000
    18             (Design and Contingencies - $250,000)
    19         (3)  RESURFACE SR 309 FROM WEST PENN                       <--
    20             TOWNSHIP LINE TO T-503 IN TAMAQUA           2,500,000
    21             (BASE PROJECT ALLOCATION - $2,400,000)
    22             (DESIGN AND CONTINGENCIES - $100,000)
    23     (D)  SR 61
    24         (1)  RESURFACE SR 61 FROM SR 183 TO MT.
    25             CARBON LINE IN NORTH MANHEIM TOWNSHIP       1,600,000
    26             (BASE PROJECT ALLOCATION - $1,520,000)
    27             (DESIGN AND CONTINGENCIES - $80,000)
    28         (2)  CONSTRUCT MEDIAN BARRIER ON SR 61 FROM
    29             SR 183 TO SR 2015 IN NORTH MANHEIM
    30             TOWNSHIP                                    4,660,000
    19970S0185B0697                 - 51 -

     1             (BASE PROJECT ALLOCATION - $3,800,000)
     2             (LAND ALLOCATION - $650,000)
     3             (DESIGN AND CONTINGENCIES - $210,000)
     4         (3)  CONSTRUCTION OF SAFETY IMPROVEMENTS ON
     5             SR 61 FROM SR 2014 TO SR 895               15,000,000
     6             (BASE PROJECT ALLOCATION - $8,000,000)
     7             (LAND ALLOCATION - $5,500,000)
     8             (DESIGN AND CONTINGENCIES - $1,500,000)
     9     (E)  SR 895
    10         (1)  RESTORATION OF SR 895 FROM SR 183 TO
    11             SOUTH MANHEIM TOWNSHIP IN WAYNE
    12             TOWNSHIP                                    1,125,000
    13             (BASE PROJECT ALLOCATION - $1,000,000)
    14             (LAND ALLOCATION - $25,000)
    15             (DESIGN AND CONTINGENCIES - $100,000)
    16     (F)  SR 924
    17         (1)  RESTORATION OF SR 924 IN VICINITY OF
    18             SHENANDOAH HEIGHTS                          1,687,000
    19             (BASE PROJECT ALLOCATION - $1,300,000)
    20             (LAND ALLOCATION - $88,000)
    21             (DESIGN AND CONTINGENCIES - $299,000)
    22  Section 355.  Snyder County.
    23     (a)  US 11/15
    24         (1)  Golden Strip, Monroe Township, Widen
    25             Roadway and Improve the Intersections
    26             From North of Selinsgrove Bypass to
    27             Shamokin Dam Borough Line, Length 2.0
    28             Miles                                       6,000,000
    29             (Base Project Allocation - $5,300,000)
    30             (Land Allocation - $500,000)
    19970S0185B0697                 - 52 -

     1             (Design and Contingencies - $200,000)
     2  Section 356.  Somerset County.
     3     (a)  US 219
     4         (1)  Davidsville to US 30 Interchange,
     5             Pavement Restoration                        1,740,000
     6             (Base Project Allocation - $1,640,000)
     7             (Design and Contingencies - $100,000)
     8  Section 357.  Sullivan County (Reserved).
     9  Section 358.  Susquehanna County.
    10     (a)  I-81
    11         (1)  Lackawanna County Line to New York
    12             State Line, Pavement Rehabilitation and
    13             Safety Improvements                         2,600,000
    14             (Base Project Allocation - $2,327,000)
    15             (Land Allocation - $13,000)
    16             (Design and Contingencies - $260,000)
    17  Section 359.  Tioga County.
    18     (a)  US 15
    19         (1)  Bridge Spanning Tioga Dam, New Two-
    20             Lane Bridge                                   125,000
    21             (Design and Contingencies - $125,000)
    22  Section 360.  Union County.
    23     (a)  US 15
    24         (1)  Snyder/Union County Line to T-365,
    25             Reconstruction and Safety Improvements      1,900,000
    26             (Base Project Allocation - $1,600,000)
    27             (Land Allocation - $100,000)
    28             (Design and Contingencies - $200,000)
    29  Section 361.  Venango County (Reserved).
    30  Section 362.  Warren County (Reserved).
    19970S0185B0697                 - 53 -

     1  Section 363.  Washington County.
     2     (a)  I-70
     3         (1)  PA 481 to Westmoreland County Line,
     4             Pavement Rehabilitation and Safety
     5             Improvements                                  600,000
     6             (Base Project Allocation - $537,000)
     7             (Land Allocation - $3,000)
     8             (Design and Contingencies - $60,000)
     9     (b)  I-79
    10         (1)  Greene, Washington, Allegheny, Butler,
    11             Lawrence, Mercer, Crawford and Erie
    12             County Lines, West Virginia to I-90,
    13             Intelligent Transportation Systems
    14             Study                                          75,000
    15             (Design and Contingencies - $75,000)
    16         (2)  Greene County Line to Milepost 48,
    17             Pavement Rehabilitation and Safety
    18             Improvements                                2,500,000
    19             (Base Project Allocation - $2,237,000)
    20             (Land Allocation - $13,000)
    21             (Design and Contingencies - $250,000)
    22         (3)  Milepost 39.4 to Milepost 42,
    23             Meadowlands Area, Resurfacing                 240,000
    24             (Base Project Allocation - $220,000)
    25             (Design and Contingencies - $20,000)
    26  Section 364.  Wayne County.
    27     (a)  I-84
    28         (1)  Lackawanna County Line to Pike County
    29             Line, Pavement Rehabilitation and
    30             Safety Improvements                           600,000
    19970S0185B0697                 - 54 -

     1             (Base Project Allocation - $537,000)
     2             (Land Allocation - $3,000)
     3             (Design and Contingencies - $60,000)
     4  Section 365.  Westmoreland County.
     5     (a)  I-70
     6         (1)  Washington County Line to I-76,
     7             Pavement Rehabilitation and Safety
     8             Improvements                                1,700,000
     9             (Base Project Allocation - $1,521,000)
    10             (Land Allocation - $9,000)
    11             (Design and Contingencies - $170,000)
    12     (b)  SR 3111
    13         (1)  Center Avenue, Borough of New Stanton,
    14             Two-Lane Relocation                           940,000
    15             (Base Project Allocation - $700,000)
    16             (Land Allocation - $40,000)
    17             (Design and Contingencies - $200,000)
    18     (c)  SR 982
    19         (1)  Reconstruction of SR 982, Including
    20             Climbing Lanes from Laurelville, Mt.
    21             Pleasant Township, to Intersection with
    22             SR 31 in Fayette County                     6,500,000
    23             (Base Project Allocation - $5,000,000)
    24             (Land Allocation - $500,000)
    25             (Design and Contingencies - $1,000,000)
    26     (D)  SR 356                                                    <--
    27         (1)  RECONSTRUCTION OF SR 356, INCLUDING
    28             WIDENING, OVERLAY, AND SAFETY
    29             IMPROVEMENTS                                3,000,000
    30             (BASE PROJECT ALLOCATION - $2,500,000)
    19970S0185B0697                 - 55 -

     1             (LAND ALLOCATION - $100,000)
     2             (DESIGN AND CONTINGENCIES - $400,000)
     3  Section 366.  Wyoming County (Reserved).
     4  Section 367.  York County.
     5     (a)  I-83
     6         (1)  US 30 to Maryland State Line, Pavement                <--
     7             Rehabilitation and Safety Improvements      4,000,000
     8             (Base Project Allocation - $3,580,000)
     9             (Land Allocation - $20,000)
    10             (Design and Contingencies - $400,000)
    11         (2) (1)  Feasibility Study for New Exit at                 <--
    12             Windy Hill Road, New Freedom Borough          100,000
    13             (Design and Contingencies - $100,000)
    14     (b)  SR 74
    15         (1)  Reconstruction of SR 74 from Red Lion
    16             to Intersection with SR 2054                1,600,000
    17             (Base Project Allocation - $1,500,000)
    18             (Design and Contingencies - $100,000)
    19     (c)  SR 3072
    20         (1)  Widen SR 3072 to Three Lanes, Hanover
    21             Borough                                       200,000
    22             (Base Project Allocation - $100,000)
    23             (Land Allocation - $50,000)
    24             (Design and Contingencies - $50,000)
    25     (d)  SR 4001
    26         (1)  Widen SR 4001 to Three FOUR Lanes from                <--
    27             US 30 to Church Road                        4,105,000
    28             (Base Project Allocation - $3,476,000)
    29             (Land Allocation - $296,000)
    30             (Design and Contingencies - $333,000)
    19970S0185B0697                 - 56 -

     1     (E)  SR 0182                                                   <--
     2         (1)  LANE ADDITION, PINE GROVE ROAD TO
     3             POWDER MILL ROAD                            1,570,000
     4  Section 368.  Statewide Wetland Mitigation.
     5     (a)  Statewide
     6         (1)  Construction of Advanced Wetland
     7             Mitigation Projects Necessary to
     8             Replace Wetlands Displaced by Highway
     9             Projects                                    1,000,000
    10             (Base Project Allocation - $800,000)
    11             (Land Allocation - $100,000)
    12             (Design and Contingencies - $100,000)
    13                             CHAPTER 5
    14                      MISCELLANEOUS PROVISIONS
    15  Section 501.  Federal funds.
    16     All moneys received from the Federal Government for the
    17  construction of the projects specifically itemized in this act
    18  are also hereby appropriated for those projects.
    19  Section 502.  Allocation of funds.
    20     Whenever as determined by the Department of Transportation
    21  that the full estimated financial costs of the projects itemized
    22  in this act are not necessary for the proper design, acquisition
    23  or construction of such projects, the excess funds no longer
    24  required may be allocated by the Pennsylvania Department of
    25  Transportation to increase the estimated costs of any one or
    26  more of the projects specifically itemized in a capital budget.
    27  Section 503.  Estimated useful life.
    28     The General Assembly states that the estimated useful life of
    29  the highway capital projects itemized in this act is 30 years.
    30  Section 504.  Effective date.
    19970S0185B0697                 - 57 -

     1     This act shall take effect immediately.




















    L27L72WMB/19970S0185B0697       - 58 -