        PRIOR PRINTER'S NOS. 178, 444, 697,           PRINTER'S NO. 2061
        2022

THE GENERAL ASSEMBLY OF PENNSYLVANIA


SENATE BILL

No. 185 Session of 1997


        INTRODUCED BY CORMAN AND STOUT, JANUARY 23, 1997

        AS RE-REPORTED FROM COMMITTEE ON APPROPRIATIONS, HOUSE OF
           REPRESENTATIVES, AS AMENDED, JUNE 8, 1998

                                     AN ACT

     1  Providing for the highway capital budget project itemization for
     2     the fiscal year 1996-1997; AND TRANSFERRING A CERTAIN          <--
     3     TOWNSHIP ROAD TO THE COMMONWEALTH.

     4     The General Assembly of the Commonwealth of Pennsylvania
     5  hereby enacts as follows:
     6                             CHAPTER 1
     7                         GENERAL PROVISIONS
     8  Section 101.  Short title.
     9     This act shall be known and may be cited as the Highway
    10  Capital Budget Project Itemization Act of 1996-1997.
    11  Section 102.  Total authorization.
    12     The total authorization for the capital projects itemized in
    13  this act and to be constructed by the Department of
    14  Transportation, its successors or assigns and to be financed
    15  from current revenues of the Motor License Fund shall be
    16  $2,971,444,000 $4,420,843,000 $4,705,996,000.                     <--


     1  Section 103.  Itemization of public highway projects.
     2     Additional capital projects in the category of public highway
     3  projects to be constructed by the Department of Transportation,
     4  its successors or assigns and to be financed from current
     5  revenues of the Motor License Fund are itemized in Chapter 3,
     6  together with their respective estimated financial costs.
     7                             CHAPTER 3
     8                         ITEMIZED PROJECTS
     9                                                           Total
    10                                                          Project
    11             Project                                    Allocation
    12  Section 301.  Adams County (Reserved).                            <--
    13  SECTION 301.  ADAMS COUNTY.                                       <--
    14     (A)  US 15
    15         (1)  PA 394 TO US 30, PAVEMENT RESTORATION      1,200,000
    16             (BASE PROJECT ALLOCATION - $1,100,000)
    17             (DESIGN AND CONTINGENCIES - $100,000)
    18         (2)  MARYLAND LINE TO US 30, PAVEMENT
    19             REHABILITATION AND SAFETY IMPROVEMENTS        810,000
    20             (BASE PROJECT ALLOCATION - $700,000)
    21             (LAND ALLOCATION - $10,000)
    22             (DESIGN AND CONTINGENCIES - $100,000)
    23     (B)  US 30
    24         (1)  SIGNAL IMPROVEMENT, CHAMBERSBURG ROAD,
    25             CUMBERLAND TOWNSHIP                            60,000
    26             (BASE PROJECT ALLOCATION - $14,000)
    27             (LAND ALLOCATION - $1,000)
    28             (DESIGN AND CONTINGENCIES - $45,000)
    29         (2)  FRANKLIN COUNTY LINE TO CASHTOWN ROAD,
    30             PAVEMENT RESTORATION                        1,030,000
    19970S0185B2061                  - 2 -

     1             (BASE PROJECT ALLOCATION - $920,000)
     2             (LAND ALLOCATION - $10,000)
     3             (DESIGN AND CONTINGENCIES - $100,000)
     4  Section 302.  Allegheny County.
     5     (a)  I-276                                                     <--
     6         (1)  Milepost 6 North to I-79, Pavement
     7             Rehabilitation and Safety Improvements      1,300,000
     8             (Base Project Allocation - $1,163,000)
     9             (Land Allocation - $7,000)
    10             (Design and Contingencies - $130,000)
    11     (A)  NORTH SHORE ROADWAY                                       <--
    12         (1)  ROADWAY AND PEDESTRIAN IMPROVEMENTS        4,001,000
    13             (BASE PROJECT ALLOCATION - $3,201,000)
    14             (LAND ALLOCATION - $400,000)
    15             (DESIGN AND CONTINGENCIES - $400,000)
    16     (b)  I-376
    17         (1)  PA 130 to I-76, Pavement
    18             Rehabilitation and Safety Improvements        500,000
    19             (Base Project Allocation - $447,000)
    20             (Land Allocation - $3,000)
    21             (Design and Contingencies - $50,000)
    22         (2)  I-376 Access Ramp, Construction of an
    23             Off-Ramp from Parkway East to
    24             Pittsburgh Technology Center Site          12,000,000
    25         (3)  GRANT STREET TO GREENSBURG PARKWAY,                   <--
    26             RESTORATION                                 2,300,000
    27             (BASE PROJECT ALLOCATION - $2,000,000)
    28             (DESIGN AND CONTINGENCIES - $300,000)
    29         (4)  PENNSYLVANIA TURNPIKE TO SQUIRREL HILL
    30             TUNNEL, INTELLIGENT TRANSPORTATION
    19970S0185B2061                  - 3 -

     1             SYSTEMS IMPROVEMENTS                        5,100,000
     2             (BASE PROJECT ALLOCATION - $5,000,000)
     3             (DESIGN AND CONTINGENCIES - $100,000)
     4     (c)  PA 19
     5         (1)  Gilkeson Road to Cochran Road,
     6             Pavement Rehabilitation and Safety
     7             Improvements                                  450,000
     8             (Base Project Allocation - $450,000)
     9     (d)  Fort Duquesne Boulevard
    10         (1)  Realignment of Fort Duquesne
    11             Boulevard                                   8,400,000
    12     (e)  Liberty Avenue
    13         (1)  Reconstruction of Liberty Avenue           6,600,000
    14     (f)  North Shore Drive
    15         (1)  Relocation of North Shore Drive to the
    16             North Side of Three Rivers Stadium Site
    17             in Order to Open Access to the
    18             Riverfront                                  8,100,000
    19     (g)  I-79
    20         (1)  Completion of the Interchange at I-79
    21             and SR 0060 to Permit Easier Access to
    22             Airport                                    10,000,000
    23         (2)  Design and construction of an
    24             Interchange at I-79 and Parkway West to
    25             Permit Easier Access to and from the
    26             Airport and I-79                           17,125,000  <--
    27             (Base Project Allocation - $15,000,000)
    28             (Design and Contingencies - $2,125,000)
    29             AIRPORT AND I-79                           43,400,000  <--
    30             (BASE PROJECT ALLOCATION - $40,000,000)
    19970S0185B2061                  - 4 -

     1             (DESIGN AND CONTINGENCIES - $3,400,000)
     2         (3)  Construct Missing Link Between I-79
     3             and Parkway West                           16,000,000
     4         (4)  GROVETON TO GLENFIELD, PHASE I HIGHWAY                <--
     5             AND BRIDGE REHABILITATION                     250,000
     6             (BASE PROJECT ALLOCATION - $200,000)
     7             (DESIGN AND CONTINGENCIES - $50,000)
     8         (5)  GROVETON TO GLENFIELD, PHASE II
     9             HIGHWAY AND BRIDGE REHABILITATION           1,320,000
    10             (BASE PROJECT ALLOCATION - $1,120,000)
    11             (DESIGN AND CONTINGENCIES - $200,000)
    12         (6)  I-79 CORRIDOR FROM WEST VIRGINIA STATE
    13             LINE TO ERIE, INTELLIGENT
    14             TRANSPORTATION SYSTEMS IMPROVEMENTS         3,100,000
    15             (BASE PROJECT ALLOCATION - $3,000,000)
    16             (DESIGN AND CONTINGENCIES - $100,000)
    17     (h)  US 22/30
    18         (1)  Reconstruction of US 22/30 Between
    19             Imperial Exit and McDonald Exit            15,000,000
    20         (2)  WASHINGTON COUNTY LINE TO US 30,                      <--
    21             PAVEMENT RESTORATION                       13,000,000
    22             (BASE PROJECT ALLOCATION - $12,900,000)
    23             (DESIGN AND CONTINGENCIES - $100,000)
    24     (i)  SR 0028
    25         (1)  Widen SR 0028 Between Downtown and
    26             40th Street Bridge                         30,000,000
    27         (2)  Installation of Noise Barriers on both                <--
    28             sides of SR 0028 from Highland Park
    29             Bridge to Lexington Avenue in Aspinwall
    30             Borough                                     5,000,000
    19970S0185B2061                  - 5 -

     1         (2)  BLAWNOX TO POWERS RUN ROAD, O'HARA                    <--
     2             TOWNSHIP, PAVEMENT REHABILITATION,
     3             RESURFACE AND SAFETY IMPROVEMENT              621,000
     4             (BASE PROJECT ALLOCATION - $540,000)
     5             (DESIGN AND CONTINGENCIES - $81,000)
     6         (3)  RAVINE TO BLAWNOX, O'HARA TOWNSHIP,
     7             PAVEMENT REHABILITATION, RESURFACE AND
     8             SAFETY IMPROVEMENTS                           770,000
     9             (BASE PROJECT ALLOCATION - $670,000)
    10             (DESIGN AND CONTINGENCIES - $100,000)
    11     (j)  SR 0051
    12         (1)  Reconstruction of Intersection of SR
    13             0051 and SR 0088                           14,518,000
    14         (2)  SR 0088 TO SR 3104, 51 SIGNALS, SIGNAL                <--
    15             IMPROVEMENTS                                   45,000
    16             (BASE PROJECT ALLOCATION - $37,000)
    17             (LAND ALLOCATION - $1,000)
    18             (DESIGN AND CONTINGENCIES - $7,000)
    19         (3)  LIBERTY TUNNELS TO LEBANON CHURCH
    20             ROAD, PAVEMENT RESTORATION AND SAFETY
    21             IMPROVEMENTS                                  700,000
    22             (BASE PROJECT ALLOCATION - $600,000)
    23             (DESIGN AND CONTINGENCIES - $100,000)
    24         (4)  MCKEES ROCKS BRIDGE INTERSECTION,
    25             WIDEN AND SIGNALIZATION                        44,000
    26             (BASE PROJECT ALLOCATION - $31,000)
    27             (LAND ALLOCATION - $7,000)
    28             (DESIGN AND CONTINGENCIES - $6,000)
    29         (5)  SOUTHBOUND, ROBERT HOLLOW ROAD TO
    30             PAYDAY, PAVEMENT REHABILITATION AND
    19970S0185B2061                  - 6 -

     1             SAFETY IMPROVEMENTS                           320,000
     2             (BASE PROJECT ALLOCATION - $300,000)
     3             (DESIGN AND CONTINGENCIES - $20,000)
     4         (6)  SR 2040 TO SR 0088, CONSTRUCT 200
     5             SPACE PARK AND RIDE LOT                       124,000
     6             (BASE PROJECT ALLOCATION - $120,000)
     7             (LAND ALLOCATION - $2,000)
     8             (DESIGN AND CONTINGENCIES - $2,000)
     9         (7)  WOODRUFF CONNECTOR, MISCELLANEOUS
    10             IMPROVEMENTS                                  158,000
    11             (BASE PROJECT ALLOCATION - $28,000)
    12             (LAND ALLOCATION - $127,000)
    13             (DESIGN AND CONTINGENCIES - $3,000)
    14         (8)  CONSTRUCT PARK AND RIDE LOT,
    15             BRENTWOOD                                      27,000
    16             (BASE PROJECT ALLOCATION - $20,000)
    17             (LAND ALLOCATION - $4,000)
    18             (DESIGN AND CONTINGENCIES - $3,000)
    19     (k)  Smithfield Street
    20         (1)  Reconstruction of the Smithfield
    21             Street Bridge to Support Retail
    22             Activity                                   18,000,000
    23     (l)  Wood Street
    24         (1)  Reconstruction of Wood Street to
    25             Support Retail Activities                  27,000,000
    26     (m)  Fifth and Forbes Reconstruction
    27         (1)  Reconstruction to Fifth and Forbes
    28             Avenue Corridor to Promote Retail
    29             Development                                12,000,000
    30     (n)  Golden Triangle Intermodal Facility/LRT
    19970S0185B2061                  - 7 -

     1         Station
     2         (1)  Development of a New Intermodal
     3             Facility and Transit Stop to Serve the
     4             Retail Centers in Downtown                 13,000,000
     5     (o)  North Side Intermodal Facility
     6         (1)  Development of a Major Commuter
     7             Interceptor Intermodal Facility and
     8             Transit Station on the North Side          34,420,000
     9     (p)  Findlay Connector
    10         (1)  Construction of Highway Connection
    11             Between Pittsburgh International
    12             Airport and Route 22 West in Order to
    13             Assist the Development of the Airport
    14             Technology Center                         100,000,000  <--
    15             TECHNOLOGY CENTER                         135,000,000  <--
    16     (q)  Cargo Interchange
    17         (1)  Development of State-of-the-Art Cargo
    18             Interchange Facility at the Cargo
    19             Terminal of the Greater Pittsburgh
    20             International Airport to Support
    21             Regional Business Growth in Global
    22             Markets                                    16,000,000
    23     (r)  Lawrenceville Industrial Access Road
    24         (1)  Construction of a Highway Bypass to
    25             Permit Truck and Passenger Cars Easier
    26             Access into and through the
    27             Lawrenceville Industrial and Commercial
    28             Areas                                      46,800,000
    29     (s)  Mon-Fayette Expressway
    30         (1)  Construction of the Mon-Fayette
    19970S0185B2061                  - 8 -

     1             Expressway from Pittsburgh to Route 51    675,000,000  <--
     2             EXPRESSWAY FROM PITTSBURGH TO ROUTE 51    700,000,000  <--
     3         (2)  CONSTRUCTION TO PENN HILLS                 2,000,000  <--
     4     (t)  Multi-Modal Corridor
     5         (1)  Transportation System Connecting
     6             Downtown Pittsburgh with the Greater
     7             Pittsburgh International Airport          363,750,000
     8     (u)  Tech World/Airport Transit Connection
     9         (1)  Creation of a Transit Connection
    10             Between the Airport Technology Center
    11             and the Greater Pittsburgh
    12             International Airport                     135,000,000
    13     (v)  Settlers Cabin Interchange
    14         (1)  Construction of a New Interchange
    15             Along Parkway West in Robinson
    16             Township                                   10,750,000
    17     (w)  South Portal of Liberty Tubes
    18         (1)  Construction of a New Free-Flowing
    19             Intersection to Accommodate Traffic
    20             Flow                                       23,450,000
    21     (x)  Ewing Interchange
    22         (1)  Construction of a New Interchange
    23             Along Parkway West in Moon Township
    24             Adjacent to the Pittsburgh
    25             International Airport                      16,350,000
    26     (y)  West End Circle
    27         (1)  Purchase of a Portion of West End
    28             Branch of Wheeling and Lake Erie
    29             Railway Right-of-Way to Accommodate
    30             West End Circle Project of PennDOT and
    19970S0185B2061                  - 9 -

     1             Reconstruct Railroad Interchange with
     2             CSXT via the Pittsburgh Industrial
     3             Railroad South of Bridgeville between
     4             Milepost 57 and Milepost 61                12,800,000
     5             (Land Allocation - $12,500,000)
     6             (Design and Contingencies - $300,000)
     7     (z)  Pittsburgh Transportation Corridor
     8         (1)  Purchase Wheeling and Lake Erie
     9             Railway Main Right-of-Way from Rook
    10             Yard (Milepost 56 to Longview Milepost
    11             46) to Create Two New Transportation
    12             Corridors to Downtown Pittsburgh           18,400,000
    13             (Land Allocation - $18,000,000)
    14             (Design and Contingencies - $400,000)
    15     (aa)  Pittsburgh Technology Center
    16         (1)  Construction of an Access Road between
    17             Pittsburgh Technology Center and South
    18             Side of LTV Site                            5,000,000
    19     (bb)  SR 3009
    20         (1)  Improvement of Intersection of SR
    21             3009, Baptist Road, and SR 2040,
    22             Broughton Road, Bethel Park                 1,200,000
    23             (Base Project Allocation - $1,000,000)
    24             (Land Allocation - $100,000)
    25             (Design and Contingencies - $100,000)
    26     (cc)  SR 2040 to SR 88
    27         (1)  200-Space Park'n Ride Lot                    124,000
    28             (Base Project Allocation - $120,000)
    29             (Land Allocation - $2,000)
    30             (Design and Contingencies - $2,000)
    19970S0185B2061                 - 10 -

     1     (dd)  I-279, I-376                                             <--
     2         (1)  Connector TO I-376, City of                           <--
     3             Pittsburgh, New Construction                  320,000  <--
     4             (Design and Contingencies - $320,000)
     5             CONSTRUCTION                                3,120,000  <--
     6             (BASE PROJECT ALLOCATION - $2,800,000)
     7             (DESIGN AND CONTINGENCIES - $320,000)
     8         (2)  BANKSVILLE INTERCHANGE, ROAD WIDENING
     9             AND RESTORATION                                98,000
    10             (BASE PROJECT ALLOCATION - $65,000)
    11             (LAND ALLOCATION - $4,000)
    12             (DESIGN AND CONTINGENCIES - $29,000)
    13         (3)  CITY OF PITTSBURGH TO ROSS TOWNSHIP,
    14             SAFETY IMPROVEMENTS, AUTOMATE HOV LANE        610,000
    15             (BASE PROJECT ALLOCATION - $535,000)
    16             (DESIGN AND CONTINGENCIES - $75,000)
    17         (4)  SLOPE EROSION IN FRANKLIN PARK
    18             BOROUGH, OHIO AND ROSS TOWNSHIPS,
    19             MISCELLANEOUS, SLOPE EROSION AND
    20             MOVEMENT                                       90,000
    21             (BASE PROJECT ALLOCATION - $75,000)
    22             (DESIGN AND CONTINGENCIES - $15,000)
    23         (5)  MILEPOST 6 NORTH TO I-79, PAVEMENT
    24             REHABILITATION AND SAFETY IMPROVEMENTS      1,300,000
    25             (BASE PROJECT ALLOCATION - $1,163,000)
    26             (LAND ALLOCATION - $7,000)
    27             (DESIGN AND CONTINGENCIES - $130,000)
    28         (6)  MSE WALL AT JACKS RUN, WALL
    29             REHABILITATION                                 95,000
    30             (BASE PROJECT ALLOCATION - $70,000)
    19970S0185B2061                 - 11 -

     1             (DESIGN AND CONTINGENCIES - $25,000)
     2         (7)  MT. NEBO ROAD SLIDE IN OHIO TOWNSHIP,
     3             MISCELLANEOUS, SLIDE REMEDIATION              222,000
     4             (BASE PROJECT ALLOCATION - $190,000)
     5             (DESIGN AND CONTINGENCIES - $32,000)
     6         (8)  SERVICE ROAD A, OHIO TOWNSHIP,
     7             MISCELLANEOUS, SLOPE MOVEMENT
     8             REMEDIATION                                    90,000
     9             (BASE PROJECT ALLOCATION - $75,000)
    10             (DESIGN AND CONTINGENCIES - $15,000)
    11         (9)  MACALEER ROAD BRIDGE TO BEAR RUN,
    12             SLOPE INSTABILITY, MISCELLANEOUS, SLOPE
    13             STABILIZATION                                  65,000
    14             (BASE PROJECT ALLOCATION - $55,000)
    15             (DESIGN AND CONTINGENCIES - $10,000)
    16         (10)  CONSTRUCTION OF NEW EXIT AND ENTRANCE                <--
    17             RAMPS FOR THE NORTH SHORE EXPRESSWAY,
    18             I-279 NEAR INTERSECTION WITH FEDERAL
    19             STREET, CITY OF PITTSBURGH                 18,000,000
    20     (ee)  SR 2046
    21         (1)  Widen and Realign Intersection of
    22             Streets Run Road at Prospect Road in
    23             Baldwin Borough                               300,000
    24         (2)  STREETS RUN ROAD HIGHWAY AND BRIDGE                   <--
    25             REHABILITATION                                125,000
    26             (BASE PROJECT ALLOCATION - $110,000)
    27             (LAND ALLOCATION - $5,000)
    28             (DESIGN AND CONTINGENCIES - $10,000)
    29     (ff)  SR 2120
    30         (1)  Widen Intersection of Brinton Road and
    19970S0185B2061                 - 12 -

     1             Yost Boulevard in Braddock Hills
     2             Borough                                        75,000
     3     (gg)  SR 22
     4         (1)  Realign and Correct Slide of William
     5             Penn Highway in Churchill Borough           3,000,000
     6     (hh)  SR 837
     7         (1)  Add Additional Lanes to SR 837 in
     8             Homestead Borough                              50,000
     9     (ii)  SR 2064
    10         (1)  Realign and Stabilize Lime Hollow Road
    11             in Penn Hills Borough                         200,000
    12     (jj)  SR 0791
    13         (1)  Add Turning Lane on Rodi Road at
    14             Hoover Road in Penn Hills Borough             500,000
    15     (kk)  SR 0791                                                  <--
    16         (1) (2)  Add Turning Lane on Rodi Road at                  <--
    17             Duff Road in Penn Hills Borough               500,000
    18     (ll)  SR 0791                                                  <--
    19         (1) (3)  Add Turning Lane on Rodi Road at                  <--
    20             Stoneledge in Penn Hills Borough              500,000
    21     (mm) (KK)  Lawrenceville Industrial Access Road                <--
    22         (1)  Construction of a 2-Lane, 38-Mile
    23             Access Highway along the Allegheny
    24             River Between 21st and 62nd Streets in
    25             the City of Pittsburgh's Lawrenceville
    26             Neighborhood                               50,000,000
    27     (LL)  LIBERTY WAY                                              <--
    28         (1)  RECONSTRUCTION OF LIBERTY WAY IN
    29             LIBERTY BOROUGH                               250,000
    30             (BASE PROJECT ALLOCATION - $175,000)
    19970S0185B2061                 - 13 -

     1             (LAND ALLOCATION - $25,000)
     2             (DESIGN AND CONTINGENCIES - $50,000)
     3     (MM)  SR 1001
     4         (1)  INTERSECTION WITH CORBET STREET IN
     5             TARENTUM BOROUGH, INSTALLATION OF
     6             TRAFFIC SIGNALS                               100,000
     7             (BASE PROJECT ALLOCATION - $80,000)
     8             (DESIGN AND CONTINGENCIES - $20,000)
     9     (NN)  NORTHSHORE/CENTRAL BUSINESS DISTRICT
    10         TRANSPORTATION IMPROVEMENT PROJECT
    11         (1)  REGIONAL HIGHWAY ACCESS IMPROVEMENTS
    12             ON PITTSBURGH'S NORTH SHORE INCLUDING
    13             RAMP CONNECTIONS WITH THE REGIONAL
    14             HIGHWAY SYSTEM                              7,756,000
    15             (BASE PROJECT ALLOCATION - $6,975,000)
    16             (DESIGN AND CONTINGENCIES - $775,000)
    17     (OO)  SR 3160
    18         (1)  WHITE SWAN TO BEAVER COUNTY LINE,
    19             PAVEMENT RESTORATION                        6,800,000
    20             (BASE PROJECT ALLOCATION - $6,700,000)
    21             (DESIGN AND CONTINGENCIES - $100,000)
    22         (2)  HANGAR ROAD TO SOUTHERN EXPRESSWAY,
    23             PAVEMENT REHABILITATION AND SAFETY
    24             IMPROVEMENTS                                1,100,000
    25             (BASE PROJECT ALLOCATION - $1,000,000)
    26             (DESIGN AND CONTINGENCIES - $100,000)
    27     (PP)  PA 48
    28         (1)  INTERSECTION WITH PA 130, MONROEVILLE,
    29             INTERSECTION IMPROVEMENTS                   1,500,000
    30             (BASE PROJECT ALLOCATION - $1,000,000)
    19970S0185B2061                 - 14 -

     1             (LAND ALLOCATION - $250,000)
     2             (DESIGN AND CONTINGENCIES - $250,000)
     3     (QQ)  PA 130
     4         (1)  ELECTRIC AVENUE TO THOMAS STREET,
     5             PAVEMENT REHABILITATION AND SAFETY
     6             IMPROVEMENTS                                  621,000
     7             (BASE PROJECT ALLOCATION - $540,000)
     8             (DESIGN AND CONTINGENCIES - $81,000)
     9     (RR)  PA 837
    10         (1)  DUQUESNE-MCKEESPORT BRIDGE TO NORTH
    11             2ND STREET, PAVEMENT REHABILITATION AND
    12             SAFETY IMPROVEMENTS                           450,000
    13             (BASE PROJECT ALLOCATION - $410,000)
    14             (DESIGN AND CONTINGENCIES - $40,000)
    15     (SS)  SR 1001
    16         (1)  FREEPORT ROAD, NORTH KENSINGTON BRIDGE
    17             TO TARENTUM BRIDGE, PAVEMENT
    18             RESTORATION                                 1,852,000
    19             (BASE PROJECT ALLOCATION - $1,700,000)
    20             (DESIGN AND CONTINGENCIES - $152,000)
    21     (TT)  SR 4003
    22         (1)  MCKNIGHT ROAD FROM NELSON RUN TO
    23             HOUSTON ROAD, PAVEMENT RESTORATION            415,000
    24             (BASE PROJECT ALLOCATION - $400,000)
    25             (DESIGN AND CONTINGENCIES - $15,000)
    26     (UU)  SR 0000
    27         (1)  CAMPBELLS RUN ROAD, ROBINSON TOWNSHIP,
    28             CONSTRUCT PARK AND RIDE LOT                    66,000
    29             (BASE PROJECT ALLOCATION - $40,000)
    30             (LAND ALLOCATION - $20,000)
    19970S0185B2061                 - 15 -

     1             (DESIGN AND CONTINGENCIES - $6,000)
     2     (VV)  LORISH ROAD
     3         (1)  LORISH ROAD, KENNEDY TOWNSHIP,
     4             CONSTRUCT PARK AND RIDE LOT                    44,000
     5             (BASE PROJECT ALLOCATION - $35,000)
     6             (LAND ALLOCATION - $4,000)
     7             (DESIGN AND CONTINGENCIES - $5,000)
     8     (WW)  PA 148
     9         (1)  MCKEESPORT-DUQUESNE BRIDGE, ACCESS
    10             IMPROVEMENTS                                1,000,000
    11             (BASE PROJECT ALLOCATION - $800,000)
    12             (LAND ALLOCATION - $100,000)
    13             (DESIGN AND CONTINGENCIES - $100,000)
    14     (XX)  US 30                                                    <--
    15         (1)  WIDENING AND INSTALLATION OF MEDIAN
    16             BARRIERS, AND RECONSTRUCTION FROM THE
    17             WESTINGHOUSE BRIDGE TO NORTH BRADDOCK
    18             LINE                                        5,800,000
    19             (BASE PROJECT ALLOCATION - $5,000,000)
    20             (LAND ALLOCATION - $350,000)
    21             (DESIGN AND CONTINGENCIES - $450,000)
    22         (2)  FIVE POINTS INTERSECTION WITH SR 3066
    23             AND WEST ALLEGHENY ROAD, NORTH FAYETTE
    24             TOWNSHIP, INTERSECTION IMPROVEMENT            875,000
    25             (BASE PROJECT ALLOCATION - $760,000)
    26             (LAND ALLOCATION - $35,000)
    27             (DESIGN AND CONTINGENCIES - $80,000)
    28     (YY)  EAST LIBERTY/PENN CIRCLE REHABILITATION,
    29         CITY OF PITTSBURGH                              4,950,000
    30             (BASE PROJECT ALLOCATION - $4,500,000)
    19970S0185B2061                 - 16 -

     1             (DESIGN AND CONTINGENCIES - $450,000)
     2     (ZZ)  CRTRCS PHASE 2, CITY OF PITTSBURGH              800,000
     3             (BASE PROJECT ALLOCATION - $650,000)
     4             (DESIGN AND CONTINGENCIES - $150,000)
     5     (AAA)  MCARDLE ROADWAY RECONSTRUCTION, CITY OF
     6         PITTSBURGH                                     10,200,000
     7             (BASE PROJECT ALLOCATION - $9,200,000)
     8             (DESIGN AND CONTINGENCIES - $1,000,000)
     9     (BBB)  OAKLAND IMPROVEMENTS
    10         (1)  FIFTH AVENUE, CITY OF PITTSBURGH           2,350,000
    11             (BASE PROJECT ALLOCATION - $2,000,000)
    12             (DESIGN AND CONTINGENCIES - $350,000)
    13     (CCC)  OAKLAND IMPROVEMENTS
    14         (1)  FORBES AVENUE, CITY OF PITTSBURGH            800,000
    15             (BASE PROJECT ALLOCATION - $700,000)
    16             (DESIGN AND CONTINGENCIES - $100,000)
    17     (DDD)  RIVER AVENUE
    18         (1)  RECONSTRUCTION, CITY OF PITTSBURGH         4,900,000
    19             (BASE PROJECT ALLOCATION - $4,300,000)
    20             (DESIGN AND CONTINGENCIES - $600,000)
    21     (EEE)  STRAWBERRY WAY
    22         (1)  IMPROVEMENTS, CITY OF PITTSBURGH           3,850,000
    23             (BASE PROJECT ALLOCATION - $3,500,000)
    24             (DESIGN AND CONTINGENCIES - $350,000)
    25     (FFF)  WENZEL AVENUE
    26         (1)  IMPROVEMENTS, CITY OF PITTSBURGH           2,900,000
    27             (BASE PROJECT ALLOCATION - $2,500,000)
    28             (DESIGN AND CONTINGENCIES - $400,000)
    29     (GGG)  RODI
    30         (1)  AT DUFF INTERSECTION, PENN HILLS             400,000
    19970S0185B2061                 - 17 -

     1         (2)  AT HOOVER INTERSECTION, PENN HILLS           250,000
     2     (HHH)  I-579
     3         (1)  EXIT RAMP OFF VETERAN'S MEMORIAL
     4             BRIDGE SOUTH TO SR 28, CITY OF
     5             PITTSBURGH                                  9,000,000
     6     (III)  OLD ROUTE 60
     7         (1)  PITTSBURGH AIRPORT, CONSTRUCT GRADE
     8             SEPARATED INTERCHANGE                       5,000,000
     9             (BASE PROJECT ALLOCATION - $4,000,000)
    10             (LAND ALLOCATION - $500,000)
    11             (DESIGN AND CONTINGENCIES - $500,000)
    12  Section 303.  Armstrong County (Reserved).                        <--
    13  SECTION 303.  ARMSTRONG COUNTY.                                   <--
    14     (A)  US 422
    15         (1)  BLANKET HILL TO ELDERTON, PAVEMENT
    16             REHABILITATION AND SAFETY IMPROVEMENTS        420,000
    17             (BASE PROJECT ALLOCATION - $400,000)
    18             (DESIGN AND CONTINGENCIES - $20,000)
    19         (2)  BUTLER COUNTY LINE TO INDIANA COUNTY
    20             LINE, PAVEMENT REHABILITATION AND
    21             SAFETY IMPROVEMENTS                           220,000
    22             (BASE PROJECT ALLOCATION - $200,000)
    23             (DESIGN AND CONTINGENCIES - $20,000)
    24         (3)  KITTANNING BYPASS, PHASE I, EAST OF
    25             KITTANNING BOROUGH, RELOCATION AND
    26             PAVEMENT REHABILITATION                       220,000
    27             (BASE PROJECT ALLOCATION - $200,000)
    28             (DESIGN AND CONTINGENCIES - $20,000)
    29     (B)  PA 210
    30         (1)  POWER PLANT ROAD, PAVEMENT
    19970S0185B2061                 - 18 -

     1             REHABILITATION AND SAFETY IMPROVEMENTS        620,000
     2             (BASE PROJECT ALLOCATION - $600,000)
     3             (DESIGN AND CONTINGENCIES - $20,000)
     4     (C)  PA 28
     5         (1)  DISTANT NORTH CLIMBING LANE, PAVEMENT
     6             RESTORATION                                 5,000,000
     7             (BASE PROJECT ALLOCATION - $4,900,000)
     8             (DESIGN AND CONTINGENCIES - $100,000)
     9     (D)  PA 85
    10         (1)  RURAL VALLEY RESTORATION, PAVEMENT
    11             REHABILITATION AND SAFETY IMPROVEMENTS        220,000
    12             (BASE PROJECT ALLOCATION - $200,000)
    13             (DESIGN AND CONTINGENCIES - $20,000)
    14     (E)  SR 4023
    15         (1)  TARRTOWN, EAST FRANKLIN TOWNSHIP,
    16             RESTORATION, RESURFACE AND RELOCATION       3,393,000
    17             (BASE PROJECT ALLOCATION - $3,000,000)
    18             (LAND ALLOCATION - $300,000)
    19             (DESIGN AND CONTINGENCIES - $93,000)
    20  Section 304.  Beaver County.
    21     (a)  SR 51
    22         (1)  Reconstruct and rehabilitate SR 51,
    23             including hillside in City of
    24             Aliquippa                                  25,000,000
    25             (Base Project Allocation - $25,000,000)
    26     (b)  PA 151
    27         (1)  Hopewell Industrial Park to PA 60,
    28             Hopewell Township, Reconstruction              83,000
    29             (Base Project Allocation - $75,000)
    30             (Design and Contingencies - $8,000)
    19970S0185B2061                 - 19 -

     1     (C)  PA 18                                                     <--
     2         (1)  BRODHEAD ROAD TO MONACA, PAVEMENT
     3             REHABILITATION AND SAFETY IMPROVEMENTS        420,000
     4             (BASE PROJECT ALLOCATION - $350,000)
     5             (DESIGN AND CONTINGENCIES - $70,000)
     6     (D)  PA 60
     7         (1)  OHIO RIVER TO PA 51, PAVEMENT
     8             RESTORATION                                11,765,000
     9             (BASE PROJECT ALLOCATION - $10,550,000)
    10             (DESIGN AND CONTINGENCIES - $1,215,000)
    11     (E)  PA 68
    12         (1)  WOLF RUN TO BARCLAY HILL, REALIGNMENT
    13             AND RESURFACE                                 696,000
    14             (BASE PROJECT ALLOCATION - $481,000)
    15             (LAND ALLOCATION - $115,000)
    16             (DESIGN AND CONTINGENCIES - $100,000)
    17     (F)  SR 2001
    18         (1)  INSTALLATION OF TRAFFIC SIGNAL AT THE
    19             INTERSECTION OF STATE STREET (SR 2001)
    20             AND LOGANS LANE IN HARMONY TOWNSHIP            40,000
    21     (G)  SR 989 AND AMBRIDGE BOROUGH
    22         (1)  INSTALLATION OF TRAFFIC SIGNALS IN THE
    23             BOROUGH OF AMBRIDGE, INCLUDING
    24             INTERSECTION OF 8TH STREET AND DUSS
    25             AVENUE (SR 989)                               500,000
    26     (H)  T-606, PARK QUARRY ROAD
    27         (1)  CROWS RUN VALLEY IN NEW SEWICKLEY
    28             TOWNSHIP TO CONWAY WALLROSE ROAD IN
    29             ECONOMY BOROUGH, RESTORATION OF FLOOD
    30             DAMAGE                                        500,000
    19970S0185B2061                 - 20 -

     1  Section 305.  Bedford County.
     2     (a)  PA 56
     3         (1)  PA 56 Extension, Bedford Township
     4             Access Road and Related Improvements          325,000
     5             (Base Project Allocation - $250,000)
     6             (Land Allocation - $50,000)
     7             (Design and Contingencies - $25,000)
     8         (2)  PA 56 EXTENSION, BEDFORD TOWNSHIP,                    <--
     9             TWO-LANE EXTENSION                          1,000,000
    10             (BASE PROJECT ALLOCATION - $550,000)
    11             (LAND ALLOCATION - $400,000)
    12             (DESIGN AND CONTINGENCIES - $50,000)
    13         (3)  IMPROVEMENTS PHASE II, SOMERSET COUNTY
    14             LINE TO I-99, RESTORATION                   2,000,000
    15             (BASE PROJECT ALLOCATION - $1,600,000)
    16             (LAND ALLOCATION - $200,000)
    17             (DESIGN AND CONTINGENCIES - $200,000)
    18         (4)  HIGHWAY IMPROVEMENTS IN CHESTNUT RIDGE
    19             SCHOOL DISTRICT                             1,000,000
    20             (BASE PROJECT ALLOCATION - $750,000)
    21             (LAND ALLOCATION - $100,000)
    22             (DESIGN AND CONTINGENCIES - $150,000)
    23     (b)  I-99
    24         (1)  Bedford Borough Line North to Blair
    25             County Line, Roadway Rehabilitation and
    26             Safety Improvements                         1,440,000
    27             (Base Project Allocation - $1,320,000)
    28             (Land Allocation - $60,000)
    29             (Design and Contingencies - $60,000)
    30     (c)  Construction of Wetlands                                  <--
    19970S0185B2061                 - 21 -

     1         (1)  Construction of Numerous Five-Acre to
     2             Ten-Acre Wetland Projects to Be Used
     3             for Future Mitigation Purposes for
     4             Highway Construction in Bedford, Blair,
     5             Cambria, Fulton, Huntingdon and
     6             Somerset Counties                             500,000
     7             (Base Project Allocation - $300,000)
     8             (Land Allocation - $50,000)
     9             (Design and Contingencies - $150,000)
    10     (d)  I-99
    11         (1) (2)  Bedford and Blair Counties, US 220                <--
    12             Conversion to I-99                             20,000
    13             (Base Project Allocation - $20,000)
    14         (3)  PENNSYLVANIA TURNPIKE TO CESSNA                       <--
    15             INTERCHANGE, PAVEMENT RESTORATION           1,257,000
    16             (BASE PROJECT ALLOCATION - $657,000)
    17             (DESIGN AND CONTINGENCIES - $600,000)
    18     (C)  US 220
    19         (1)  BEDFORD SOUTH, RESURFACE, PAVEMENT
    20             REHABILITATION AND SAFETY IMPROVEMENTS      1,780,000
    21             (BASE PROJECT ALLOCATION - $1,620,000)
    22             (DESIGN AND CONTINGENCIES - $160,000)
    23         (2)  US 30 SOUTH TO END OF FOUR-LANE,
    24             RESTORATION                                 9,500,000
    25             (BASE PROJECT ALLOCATION - $8,000,000)
    26             (LAND ALLOCATION - $500,000)
    27             (DESIGN AND CONTINGENCIES - $1,000,000)
    28     (e) (D)  SR 4009                                               <--
    29         (1)  Improvements of Intersection of SR
    30             4009, Sunnyside Road and SR 1001, North
    19970S0185B2061                 - 22 -

     1             Richard Street, Bedford Borough               550,000
     2             (Base Project Allocation - $400,000)
     3             (Land Allocation - $75,000)
     4             (Design and Contingencies - $75,000)
     5         (2)  SR 4009 AND SR 1001, BUSINESS PARK,                   <--
     6             BEDFORD TOWNSHIP, PAVEMENT
     7             REHABILITATION AND SAFETY IMPROVEMENTS        500,000
     8             (BASE PROJECT ALLOCATION - $360,000)
     9             (LAND ALLOCATION - $80,000)
    10             (DESIGN AND CONTINGENCIES - $60,000)
    11  Section 306.  Berks County.
    12     (a)  I-78
    13         (1)  Lebanon County Line to East of
    14             Frystown, Rehabilitation and Safety
    15             Improvements                               13,395,000
    16             (Base Project Allocation - $12,500,000)
    17             (Land Allocation - $45,000)
    18             (Design and Contingencies - $750,000)
    19         (2)  Hamburg to Lehigh County, Pavement,
    20             Bridge Rehabilitation and Safety
    21             Improvements                               26,127,000
    22             (Base Project Allocation - $25,477,000)
    23             (Design and Contingencies - $650,000)
    24     (b)  SR 0183
    25         (1)  Interchange with SR 0222, Widen Bridge
    26             and Reconstruct Interchange                14,500,000
    27             (Base Project Allocation - $7,400,000)
    28             (Land Allocation - $4,600,000)
    29             (Design and Contingencies - $2,500,000)
    30         (2)  Intersection with SR 3055, Widen
    19970S0185B2061                 - 23 -

     1             Bridge and Reconstruct Interchange          5,000,000
     2             (Base Project Allocation - $3,500,000)
     3             (Land Allocation - $750,000)
     4             (Design and Contingencies - $750,000)
     5     (c)  US 222
     6         (1)  Reconstruct US 222 as a Four-Lane
     7             Limited Access Highway Between SR 3028
     8             (Warren Street Extension) in Cumru
     9             Township and the Existing US 222
    10             Expressway in Lancaster County             90,200,000
    11             (Base Project Allocation - $66,000,000)
    12             (Land Allocation - $17,200,000)
    13             (Design and Contingencies - $7,000,000)
    14         (2)  Intersection with SR 0073,
    15             Intersection Improvements                     903,000
    16             (Base Project Allocation - $628,000)
    17             (Land Allocation - $175,000)
    18             (Design and Contingencies - $100,000)
    19         (3)  Intersection with SR 0662,
    20             Intersection Improvements                     551,000
    21             (Base Project Allocation - $445,000)
    22             (Land Allocation - $51,000)
    23             (Design and Contingencies - $55,000)
    24         (4)  MILLING AND RESURFACING, PAVEMENT                     <--
    25             RESTORATION                                   600,000
    26             (BASE PROJECT ALLOCATION - $500,000)
    27             (DESIGN AND CONTINGENCIES - $100,000)
    28     (d)  SR 0061
    29         (1)  SR 3055 to Schuylkill County Line, Add
    30             Lanes, Resurface and Shoulder
    19970S0185B2061                 - 24 -

     1             Construction                               20,000,000
     2         (2)  SR 3055 to US 222, Widen Highway,
     3             Abolish Existing Railroad Overpass and
     4             Construct New Overpass                     20,000,000
     5         (3)  HIGHWAY TRANSPORTATION STUDY FOR ROUTE                <--
     6             61 IN MUHLENBERG TOWNSHIP                     400,000
     7             (DESIGN AND CONTINGENCIES - $400,000)
     8     (e)  SR 2033
     9         (1)  Shelbourne Road TR 422 and TR 562,
    10             Realignment                                 6,525,000
    11             (Base Project Allocation - $5,375,000)
    12             (Land Allocation - $400,000)
    13             (Design and Contingencies - $750,000)
    14     (f)  SR 3055
    15         (1)  Outer Bypass Rehabilitation, SR 0061
    16             to the End of Expressway,
    17             Rehabilitation                              4,400,000
    18             (Base Project Allocation - $2,400,000)
    19             (Land Allocation - $1,000,000)
    20             (Design and Contingencies - $1,000,000)
    21         (2)  MUHLENBERG TOWNSHIP, PAVEMENT                         <--
    22             RESTORATION                                 2,825,000
    23             (BASE PROJECT ALLOCATION - $2,750,000)
    24             (DESIGN AND CONTINGENCIES - $75,000)
    25     (g)  SR 0737
    26         (1)  Widen and Reconstruct Between SR 0222
    27             and I-78                                    3,000,000
    28     (h)  Warren Street Extension
    29         (1)  Construct a New Four-Lane Limited
    30             Access Highway Connecting US 422 in the
    19970S0185B2061                 - 25 -

     1             Borough of Wyomissing to US 222 in
     2             Cumru Township. The Proposed Highway
     3             would have Interchanges with US 422, PA
     4             724 and US 222                             72,500,000
     5             (Base Project Allocation - $45,500,000)
     6             (Land Allocation - $18,800,000)
     7             (Design and Contingencies - $8,200,000)
     8     (i)  SR 422
     9         (1)  Intersection with TR 662, Douglass
    10             Township, Relocation and Reconstruction
    11             of Intersection                             5,000,000
    12         (2)  READING TO CHESTER COUNTY LINE,                       <--
    13             PAVEMENT REHABILITATION AND SAFETY
    14             IMPROVEMENTS                                1,200,000
    15             (BASE PROJECT ALLOCATION - $1,000,000)
    16             (DESIGN AND CONTINGENCIES - $200,000)
    17         (3)  DOUGLASSVILLE AREA, MILL, RESURFACE
    18             AND PAVEMENT RESTORATION                      983,000
    19             (BASE PROJECT ALLOCATION - $958,000)
    20             (DESIGN AND CONTINGENCIES - $25,000)
    21     (j)  Kutztown University
    22         (1)  Construction of New Access Road to
    23             Kutztown University and Relocation of
    24             State Road                                  2,760,000
    25     (K)  I-176                                                     <--
    26         (1)  CUMRU TOWNSHIP, PAVEMENT RESTORATION       1,200,000
    27             (BASE PROJECT ALLOCATION - $1,100,000)
    28             (DESIGN AND CONTINGENCIES - $100,000)
    29     (L)  SR 3040
    30         (1)  PARK ROAD 3 ROUTES LINKED TO PARK
    19970S0185B2061                 - 26 -

     1             ROAD, MISCELLANEOUS IMPROVEMENTS AND
     2             RESIGNING AS NECESSARY                        750,000
     3             (BASE PROJECT ALLOCATION - $700,000)
     4             (DESIGN AND CONTINGENCIES - $50,000)
     5  Section 307.  Blair County.
     6     (a)  I-99
     7         (1)  Bedford County Line North to the
     8             Village of Bald Eagle, Roadway
     9             Rehabilitation and Safety Improvements      1,440,000
    10             (Base Project Allocation - $1,320,000)
    11             (Land Allocation - $60,000)
    12             (Design and Contingencies - $60,000)
    13         (2)  Construction of New Interchange with
    14             US 220 at Kettle Street to Juniata Gap
    15             Road at Chestnut Avenue                    90,000,000
    16             (Base Project Allocation - $79,000,000)
    17             (Land Allocation - $1,000,000)
    18             (Design and Contingencies -
    19             $10,000,000)
    20         (3)  TYRONE BYPASS, RESTORATION                10,000,000  <--
    21             (BASE PROJECT ALLOCATION - $9,000,000)
    22             (DESIGN AND CONTINGENCIES - $1,000,000)
    23     (b)  SR 4027
    24         (1)  Reconstruction and/or Relocation in
    25             Tyrone Borough and Snyder Township          3,200,000
    26             (Base Project Allocation - $2,500,000)
    27             (Land Allocation - $200,000)
    28             (Design and Contingencies - $500,000)
    29     (c)  SR 4008
    30         (1)  Reconstruction of Horseshoe Curve Road
    19970S0185B2061                 - 27 -

     1             from 40th Street and Board Avenue to US
     2             22 at Gallitzin Interchange in Cambria
     3             County                                      4,901,000
     4             (Base Project Allocation - $4,198,000)
     5             (Land Allocation - $350,000)
     6             (Design and Contingencies - $353,000)
     7     (d)  Chestnut Avenue Extension
     8         (1)  Complete Construction of Chestnut
     9             Avenue Extension                           27,000,000
    10             (Base Project Allocation - $17,000,000)
    11             (Land Allocation - $5,000,000)
    12             (Design and Contingencies - $5,000,000)
    13     (E)  US 22                                                     <--
    14         (1)  FRANKSTOWN TO YELLOW SPRING, PAVEMENT
    15             REHABILITATION AND SAFETY IMPROVEMENTS      1,040,000
    16             (BASE PROJECT ALLOCATION - $1,000,000)
    17             (LAND ALLOCATION - $20,000)
    18             (DESIGN AND CONTINGENCIES - $20,000)
    19     (F)  SR 1001
    20         (1)  PLANK ROAD IMPROVEMENTS AT I-99,
    21             CORRIDOR IMPROVEMENTS                       2,400,000
    22             (BASE PROJECT ALLOCATION - $2,000,000)
    23             (LAND ALLOCATION - $200,000)
    24             (DESIGN AND CONTINGENCIES - $200,000)
    25     (G)  PA 36
    26         (1)  CONVENTION CENTER CONNECTOR FROM SR
    27             1001, CONSTRUCT NEW FOUR-LANE ROAD            800,000
    28             (BASE PROJECT ALLOCATION - $600,000)
    29             (LAND ALLOCATION - $100,000)
    30             (DESIGN AND CONTINGENCIES - $100,000)
    19970S0185B2061                 - 28 -

     1     (H)  ALTOONA BALLPARK ACCESS
     2         (1)  LOGAN TOWNSHIP, INTERCHANGE AND
     3             ROADWAY IMPROVEMENTS                        1,250,000
     4             (BASE PROJECT ALLOCATION - $1,080,000)
     5             (LAND ALLOCATION - $20,000)
     6             (DESIGN AND CONTINGENCIES - $150,000)
     7     (I)  ALTOONA CONVENTION CENTER ACCESS
     8         (1)  ALLEGHENY AND LOGAN TOWNSHIPS, ROADWAY
     9             CONSTRUCTION AND RELATED IMPROVEMENTS      10,075,000
    10             (BASE PROJECT ALLOCATION - $8,335,000)
    11             (LAND ALLOCATION - $520,000)
    12             (DESIGN AND CONTINGENCIES - $1,220,000)
    13     (J)  SR 1013
    14         (1)  IMPROVE THREE DRAINAGE STRUCTURES AT
    15             SEG. 270 (2 LOCATIONS) AND SEG. 290         1,500,000
    16             (BASE PROJECT ALLOCATION - $1,125,000)
    17             (LAND ALLOCATION - $25,000)
    18             (DESIGN AND CONTINGENCIES - $350,000)
    19  Section 308.  Bradford County.
    20     (a)  SR 14
    21         (1)  Canton Township, Intersection of PA 14
    22             and SR 3012, Village of Grover, 0.5
    23             Mile Reconstruction, Improve Horizontal
    24             Alignment and Intersection                  2,100,000
    25             (Base Project Allocation - $1,800,000)
    26             (Land Allocation - $100,000)
    27             (Design and Contingencies - $200,000)
    28         (2)  GROVER CURVE, PAVEMENT REHABILITATION                 <--
    29             AND SAFETY IMPROVEMENTS                       420,000
    30             (BASE PROJECT ALLOCATION - $400,000)
    19970S0185B2061                 - 29 -

     1             (DESIGN AND CONTINGENCIES - $20,000)
     2     (B)  US 220
     3         (1)  TOWANDA BYPASS, CONCRETE PAVEMENT
     4             REHABILITATION                              1,920,000
     5             (BASE PROJECT ALLOCATION - $1,520,000)
     6             (DESIGN AND CONTINGENCIES - $400,000)
     7     (C)  PA 549
     8         (1)  TIOGA COUNTY LINE TO PA 328,
     9             RESTORATION                                   460,000
    10             (BASE PROJECT ALLOCATION - $260,000)
    11             (LAND ALLOCATION - $100,000)
    12             (DESIGN AND CONTINGENCIES - $100,000)
    13  Section 309.  Bucks County.
    14     (a)  I-95
    15         (1)  Philadelphia County to New Jersey
    16             State Line, Pavement Rehabilitation and
    17             Safety Improvements                         1,900,000
    18             (Base Project Allocation - $1,700,000)
    19             (Land Allocation - $10,000)
    20             (Design and Contingencies - $190,000)
    21         (2)  STREET ROAD AND SR 413 RAMPS, PAVEMENT                <--
    22             REHABILITATION AND SAFETY IMPROVEMENTS      3,000,000
    23             (BASE PROJECT ALLOCATION - $2,550,000)
    24             (DESIGN AND CONTINGENCIES - $450,000)
    25     (b)  SR 309
    26         (1)  County Line Road, Hilltown Township to
    27             Bethlehem Road, West Rockhill Township,
    28             Pavement Rehabilitation, Shoulders and
    29             Safety Improvements                         2,000,000
    30             (Base Project Allocation - $1,500,000)
    19970S0185B2061                 - 30 -

     1             (Land Allocation - $150,000)
     2             (Design and Contingencies - $350,000)
     3         (2)  SR 313 AND SR 663, INTERCHANGE TO                     <--
     4             LEHIGH COUNTY, ADD LANE                       239,000
     5             (BASE PROJECT ALLOCATION - $216,000)
     6             (LAND ALLOCATION - $3,000)
     7             (DESIGN AND CONTINGENCIES - $20,000)
     8         (3)  SELLERSVILLE BYPASS, CHURCH ROAD TO
     9             RICH HILL ROAD, PAVEMENT REHABILITATION
    10             AND SAFETY IMPROVEMENTS                     1,180,000
    11             (BASE PROJECT ALLOCATION - $980,000)
    12             (DESIGN AND CONTINGENCIES - $200,000)
    13     (c)  SR 313
    14         (1)  New Galena Road, New Britain Township
    15             to Stump Road, New Britain Township,
    16             Install Truck Climbing Lane in
    17             Westbound Direction                           750,000
    18             (Base Project Allocation - $500,000)
    19             (Land Allocation - $150,000)
    20             (Design and Contingencies - $100,000)
    21     (d)  SR 332
    22         (1)  Newtown and Lower Makefield Townships,
    23             at Lindenhurst Road, SR 2069, Widening,
    24             Intersection Improvements and Highway
    25             Restoration                                 1,000,000
    26             (Base Project Allocation - $1,000,000)
    27         (2)  SR 332 AND I-95 INTERCHANGE,                          <--
    28             INTERSECTION AND SAFETY IMPROVEMENTS        5,000,000
    29             (BASE PROJECT ALLOCATION - $4,500,000)
    30             (LAND ALLOCATION - $200,000)
    19970S0185B2061                 - 31 -

     1             (DESIGN AND CONTINGENCIES - $300,000)
     2     (E)  SR 2025
     3         (1)  BRISTOL ROAD, NESHAMINY BOULEVARD TO
     4             BROWNSTOWN PIKE, PAVEMENT
     5             REHABILITATION AND SAFETY IMPROVEMENTS        585,000
     6             (BASE PROJECT ALLOCATION - $240,000)
     7             (LAND ALLOCATION - $45,000)
     8             (DESIGN AND CONTINGENCIES - $300,000)
     9     (F)  PA 413
    10         (1)  WINCHESTER AVENUE TO NEWTOWN BYPASS,
    11             PAVEMENT REHABILITATION AND SAFETY
    12             IMPROVEMENTS                                  508,000
    13             (BASE PROJECT ALLOCATION - $320,000)
    14             (DESIGN AND CONTINGENCIES - $188,000)
    15         (2)  LOWER ROADWAY OF SR 413 BENEATH AMTRAK
    16             BRIDGE AT INTERSECTION WITH SR 13           2,200,000
    17             (BASE PROJECT ALLOCATION - $2,000,000)
    18             (DESIGN AND CONTINGENCIES - $200,000)
    19     (G)  PA 611
    20         (1)  DOYLESTOWN BYPASS, EASTON ROAD TO
    21             FERRY ROAD, PAVEMENT REHABILITATION AND
    22             SAFETY IMPROVEMENTS                           680,000
    23             (BASE PROJECT ALLOCATION - $480,000)
    24             (DESIGN AND CONTINGENCIES - $200,000)
    25     (H)  US 13
    26         (1)  BRISTOL PIKE, MORRISVILLE ROAD, FALLS
    27             TOWNSHIP, RESTORATION, PAVEMENT
    28             REHABILITATION AND SAFETY IMPROVEMENTS      5,100,000
    29             (BASE PROJECT ALLOCATION - $4,500,000)
    30             (DESIGN AND CONTINGENCIES - $600,000)
    19970S0185B2061                 - 32 -

     1         (2)  INTERCHANGE WITH PENNSYLVANIA
     2             TURNPIKE, INTERCHANGE IMPROVEMENTS          1,000,000
     3             (BASE PROJECT ALLOCATION - $800,000)
     4             (LAND ALLOCATION - $100,000)
     5             (DESIGN AND CONTINGENCIES - $100,000)
     6     (I)  US 202
     7         (1)  DOYLESTOWN TO MONTGOMERYVILLE, FOUR-
     8             LANE DIVIDED RELOCATION                    67,040,000
     9             (BASE PROJECT ALLOCATION - $28,000,000)
    10             (LAND ALLOCATION - $33,000,000)
    11             (DESIGN AND CONTINGENCIES - $6,040,000)
    12         (2)  OFF-SITE IMPROVEMENTS, WARRINGTON AND
    13             DOYLESTOWN                                  1,000,000
    14             (BASE PROJECT ALLOCATION - $800,000)
    15             (LAND ALLOCATION - $120,000)
    16             (DESIGN AND CONTINGENCIES - $80,000)
    17         (3)  BUCKS AND MONTGOMERY COUNTIES, FOUR-
    18             LANE DIVIDED RELOCATION                     6,000,000
    19             (BASE PROJECT ALLOCATION - $4,000,000)
    20             (LAND ALLOCATION - $1,400,000)
    21             (DESIGN AND CONTINGENCIES - $600,000)
    22     (J)  SR 2029
    23         (1)  FALLS TOWNSHIP AND MIDDLETOWN
    24             TOWNSHIP, INTERSECTION IMPROVEMENTS AND
    25             ROADWAY REALIGNMENT                         1,000,000
    26             (BASE PROJECT ALLOCATION - $760,000)
    27             (LAND ALLOCATION - $200,000)
    28             (DESIGN AND CONTINGENCIES - $40,000)
    29  Section 310.  Butler County.
    30     (a)  US 422
    19970S0185B2061                 - 33 -

     1         (1)  Intersection Improvements and
     2             Installation of New Traffic Signals at
     3             Intersection of US 422, SR 0038 and SR
     4             0068                                        8,000,000
     5         (2)  Restoration of US 422 in Muddycreek
     6             and Franklin Townships                     10,100,000
     7             (Base Project Allocation - $10,000,000)
     8             (Design and Contingencies - $100,000)
     9         (3)  BUTLER BYPASS, PAVEMENT REHABILITATION                <--
    10             AND SAFETY IMPROVEMENTS                     1,020,000
    11             (BASE PROJECT ALLOCATION - $1,000,000)
    12             (DESIGN AND CONTINGENCIES - $20,000)
    13         (4)  LAWRENCE COUNTY LINE TO ARMSTRONG
    14             COUNTY LINE, PAVEMENT REHABILITATION
    15             AND SAFETY IMPROVEMENTS                       220,000
    16             (BASE PROJECT ALLOCATION - $200,000)
    17             (DESIGN AND CONTINGENCIES - $20,000)
    18         (5)  MOUNT CHESTNUT TO PA 528, PAVEMENT
    19             REHABILITATION AND SAFETY IMPROVEMENTS        420,000
    20             (BASE PROJECT ALLOCATION - $400,000)
    21             (DESIGN AND CONTINGENCIES - $20,000)
    22         (6)  SOUTH FROM PA 28 TO SR 2006, PAVEMENT
    23             RESTORATION                                 6,400,000
    24             (BASE PROJECT ALLOCATION - $6,300,000)
    25             (DESIGN AND CONTINGENCIES - $100,000)
    26     (b)  Hansen Avenue
    27         (1)  Installation of New Traffic Signals at
    28             Hansen Avenue in Butler Township              160,000
    29     (c)  SR 0068
    30         (1)  Installation of Traffic Signals at
    19970S0185B2061                 - 34 -

     1             Intersection with Whitestown Road              50,000
     2         (2)  Installation of Traffic Signals at
     3             Intersection with Stevenson Road               50,000
     4     (d)  SR 0356
     5         (1)  Widen SR 0356 from Silverville Road to
     6             Riemer Road                                 5,000,000
     7     (e)  SR 0228
     8         (1)  Installation of Traffic Signals at
     9             Intersection with South Pike Road             200,000
    10         (2)  Restoration, Reconstruction and
    11             Widening of SR 228 from SR 3015 to SR 8
    12             South                                       9,700,000
    13             (Base Project Allocation - $8,000,000)
    14             (Land Allocation - $1,000,000)
    15             (Design and Contingencies - $700,000)
    16         (3)  Restoration, Reconstruction and
    17             Widening of SR 228 from SR 8 South to
    18             SR 356                                     21,500,000
    19             (Base Project Allocation - $18,000,000)
    20             (Land Allocation - $2,000,000)
    21             (Design and Contingencies - $1,500,000)
    22     (f)  South Pike Road
    23         (1)  Installation of Traffic Signals at
    24             Intersection with Monroe Road                 200,000
    25     (g)  SR 528
    26         (1)  Reconstruction of Existing Interchange
    27             in Jackson Township                         1,900,000
    28             (Base Project Allocation - $1,400,000)
    29             (Land Allocation - $200,000)
    30             (Design and Contingencies - $300,000)
    19970S0185B2061                 - 35 -

     1     (h)  SR 3025
     2         (1)  Reconstruction of Existing Interchange
     3             in Jackson Township                         4,100,000
     4             (Base Project Allocation - $3,500,000)
     5             (Land Allocation - $300,000)
     6             (Design and Contingencies - $300,000)
     7     (i)  SR 8
     8         (1)  Restoration and Reconstruction of SR 8
     9             South in City of Butler and Butler,
    10             Penn and Middlesex Townships               16,700,000
    11             (Base Project Allocation - $15,000,000)
    12             (Land Allocation - $1,000,000)
    13             (Design and Contingencies - $700,000)
    14     (J)  PA 28                                                     <--
    15         (1)  FREEPORT NORTH FROM ALLEGHENY COUNTY
    16             LINE TO T-300, PAVEMENT RESTORATION         5,500,000
    17             (BASE PROJECT ALLOCATION - $5,400,000)
    18             (DESIGN AND CONTINGENCIES - $100,000)
    19         (2)  BUTLER AND ARMSTRONG COUNTIES FROM
    20             ALLEGHENY COUNTY LINE TO KITTANNING,
    21             PAVEMENT REHABILITATION AND SAFETY
    22             IMPROVEMENTS                                1,200,000
    23             (BASE PROJECT ALLOCATION - $1,000,000)
    24             (DESIGN AND CONTINGENCIES - $200,000)
    25  Section 311.  Cambria County.
    26     (a)  US 219
    27         (1)  Scalp Avenue to Davidsville, Pavement
    28             Restoration                                 1,392,000
    29             (Base Project Allocation - $1,312,000)
    30             (Design and Contingencies - $80,000)
    19970S0185B2061                 - 36 -

     1         (2)  AIRPORT INTELLIGENT TRANSPORTATION                    <--
     2             SYSTEMS TO SIDMAN INTERCHANGE, PAVEMENT
     3             RESTORATION                                 2,100,000
     4             (BASE PROJECT ALLOCATION - $2,000,000)
     5             (DESIGN AND CONTINGENCIES - $100,000)
     6         (3)  CARROLLTOWN TO DUBOIS, PRELIMINARY
     7             ENGINEERING STUDY                             120,000
     8             (DESIGN AND CONTINGENCIES - $120,000)
     9         (4)  CHICKORY MOUNTAIN, PRECONSTRUCTION
    10             PHASES                                      1,120,000
    11             (LAND ALLOCATION - $480,000)
    12             (DESIGN AND CONTINGENCIES - $640,000)
    13     (b)  SR 4021
    14         (1)  Construct Access Road from SR 4021 to
    15             Hastings Area Industrial Park               1,300,000
    16     (c)  PA 56
    17         (1)  Haws Pike, Lower Yoder Township
    18             Roadway Rehabilitation and Safety
    19             Improvements                                  400,000
    20             (Base Project Allocation - $380,000)
    21             (Design and Contingencies - $20,000)
    22         (2)  PA 56 AT SR 3033, RICHLAND TOWNSHIP,                  <--
    23             PA 56 DETOUR BRIDGE REPLACEMENT                70,000
    24             (BASE PROJECT ALLOCATION - $50,000)
    25             (LAND ALLOCATION - $3,000)
    26             (DESIGN AND CONTINGENCIES - $17,000)
    27         (3)  US 219 INTERCHANGE TO WIDMAN STREET,
    28             PAVEMENT RESTORATION                          960,000
    29             (BASE PROJECT ALLOCATION - $760,000)
    30             (DESIGN AND CONTINGENCIES - $200,000)
    19970S0185B2061                 - 37 -

     1         (4)  PA 56 AND PA 403, ROOSEVELT BOULEVARD
     2             TO WESTMORELAND COUNTY LINE, RELOCATION
     3             AND RECONSTRUCTION                         13,600,000
     4             (BASE PROJECT ALLOCATION - $10,000,000)
     5             (LAND ALLOCATION - $1,600,000)
     6             (DESIGN AND CONTINGENCIES - $2,000,000)
     7     (D)  PA 271
     8         (1)  PERGRIM HILL, RECONSTRUCT AND WIDEN          700,000
     9             (BASE PROJECT ALLOCATION - $480,000)
    10             (LAND ALLOCATION - $140,000)
    11             (DESIGN AND CONTINGENCIES - $80,000)
    12     (E)  ST. FRANCIS COLLEGE                                       <--
    13         (1)  IMPROVEMENTS TO ACCESS ROADS AND
    14             PARKING FACILITIES IN AND AROUND ST.
    15             FRANCIS COLLEGE                               500,000
    16             (BASE PROJECT ALLOCATION - $400,000)
    17             (LAND ALLOCATION - $50,000)
    18             (DESIGN AND CONTINGENCIES - $50,000)
    19  Section 312.  Cameron County (Reserved).
    20  Section 313.  Carbon County.
    21     (a)  I-80
    22         (1)  Harmony Lake to Monroe County,
    23             Pavement Rehabilitation and Safety
    24             Improvements                                  200,000
    25             (Base Project Allocation - $179,000)
    26             (Land Allocation - $1,000)
    27             (Design and Contingencies - $20,000)
    28         (2)  Reconstruction of Rest Area on
    29             Westbound I-80 in Kidder Township           4,950,000
    30             (Base Project Allocation - $2,700,000)
    19970S0185B2061                 - 38 -

     1             (Land Allocation - $1,000,000)
     2             (Design and Contingencies - $1,250,000)
     3         (3)  Construct New Weigh Station at Rest
     4             Area on Westbound I-80 in Kidder
     5             Township                                      330,000
     6             (Base Project Allocation - $300,000)
     7             (Design and Contingencies - $30,000)
     8     (b)  SR 248
     9         (1)  Rehabilitation and Restoration of SR
    10             248 from US 209 to Palmerton Borough        1,900,000
    11             (Base Project Allocation - $1,900,000)
    12         (2)  Rehabilitation and Restoration of SR
    13             248 from SR 895 to Northampton County
    14             line                                        2,300,000
    15             (Base Project Allocation - $2,200,000)
    16             (Land Allocation - $50,000)
    17             (Design and Contingencies - $50,000)
    18     (c)  SR 2006
    19         (1)  Intersection Improvements at
    20             Intersection of SR 2006 and SR 2002 in
    21             Lower Towamensing Township                  1,150,000
    22             (Base Project Allocation - $850,000)
    23             (Land Allocation - $150,000)
    24             (Design and Contingencies - $150,000)
    25     (d)  SR 2015
    26         (1)  Restoration of SR 2015 in Borough of
    27             Weissport                                     800,000
    28             (Base Project Allocation - $400,000)
    29             (Land Allocation - $100,000)
    30             (Design and Contingencies - $300,000)
    19970S0185B2061                 - 39 -

     1     (E)  SR 209                                                    <--
     2         (1)  RECONSTRUCTION OF INTERSECTION OF SR
     3             209 AND SR 248, INCLUDING SAFETY
     4             IMPROVEMENTS AND INSTALLATION OF
     5             TRAFFIC SIGNALS                               475,000
     6             (BASE PROJECT ALLOCATION - $350,000)
     7             (DESIGN AND CONTINGENCIES - $125,000)
     8         (2)  SAFETY IMPROVEMENTS, INCLUDING
     9             RECONSTRUCTION OF INTERSECTION OF SR
    10             209 AND BROADWAY, JIM THORPE BOROUGH,
    11             INCLUDING CONSTRUCTION OF TURNING
    12             LANES, IMPROVED PEDESTRIAN AND TRAFFIC
    13             SIGNALIZATION AND CONSTRUCTION OF
    14             HANDICAPPED CURB CUTS                       1,150,000
    15             (BASE PROJECT ALLOCATION - $950,000)
    16             (DESIGN AND CONTINGENCIES - $200,000)
    17     (F)  SR 443
    18         (1)  RECONSTRUCTION OF INTERSECTION OF SR
    19             443 AND SR 902, INCLUDING SAFETY
    20             IMPROVEMENTS, INSTALLATION OF TRAFFIC
    21             SIGNALS AND CONSTRUCTION OF A PASSING
    22             LANE                                          575,000
    23             (BASE PROJECT ALLOCATION - $450,000)
    24             (DESIGN AND CONTINGENCIES - $125,000)
    25  Section 314.  Centre County.
    26     (a)  I-80
    27         (1)  Clearfield County Line to Clinton
    28             County, Pavement Rehabilitation and
    29             Safety Improvements                         3,300,000
    30             (Base Project Allocation - $2,953,000)
    19970S0185B2061                 - 40 -

     1             (Land Allocation - $17,000)
     2             (Design and Contingencies - $330,000)
     3         (2)  Marion Township, Exit 24, Interchange
     4             Reconstruction                              1,560,000
     5             (Base Project Allocation - $1,500,000)
     6             (Design and Contingencies - $60,000)
     7         (3)  Boggs Township, Exit 23, Interchange
     8             Reconstruction                              1,160,000
     9             (Base Project Allocation - $1,100,000)
    10             (Design and Contingencies - $60,000)
    11         (4)  MILE POST 117 TO MILE POST 140,                       <--
    12             CROSSOVERS AND PAVEMENT RESTORATION         3,600,000
    13             (BASE PROJECT ALLOCATION - $3,500,000)
    14             (DESIGN AND CONTINGENCIES - $100,000)
    15     (b)  PA 504
    16         (1)  Phillipsburg Borough and Rush
    17             Township, Cold Stream Run Bridge to
    18             Airport, Two-Lane Reconstruction              400,000
    19             (Base Project Allocation - $240,000)
    20             (Land Allocation - $60,000)
    21             (Design and Contingencies - $100,000)
    22     (c)  PA 350
    23         (1)  Climbing Lane and Two-Lane Relocation,
    24             North of Bald Eagle to Top of Sandy
    25             Ridge Mountain                              5,750,000
    26             (Base Project Allocation - $5,200,000)
    27             (Land Allocation - $150,000)
    28             (Design and Contingencies - $400,000)
    29         (2)  SAFETY IMPROVEMENTS ALONG SR 350             500,000  <--
    30         (3)  PA 350 TO US 322, PRELIMINARY
    19970S0185B2061                 - 41 -

     1             ENGINEERING STUDY                             100,000
     2             (DESIGN AND CONTINGENCIES - $100,000)
     3         (4)  SAFETY IMPROVEMENTS, OVER VERTICAL
     4             CORRECTION AND TURNING LANES AT VARIOUS
     5             LOCATIONS                                   2,175,000
     6             (BASE PROJECT ALLOCATION - $2,000,000)
     7             (LAND ALLOCATION - $100,000)
     8             (DESIGN AND CONTINGENCIES - $75,000)
     9     (D)  SNOWSHOE TOWNSHIP
    10         (1)  INTELLIGENT TRANSPORTATION SYSTEMS           740,000
    11             (BASE PROJECT ALLOCATION - $690,000)
    12             (DESIGN AND CONTINGENCIES - $50,000)
    13     (E)  SR 0026
    14         (1)  LOGAN BRIDGE TO BELLEFONTE BYPASS,
    15             FOUR-LANE RELOCATION                        8,640,000
    16             (BASE PROJECT ALLOCATION - $8,640,000)
    17         (2)  HUNTINGDON COUNTY LINE TO STATE
    18             COLLEGE, RECONSTRUCTION AND SAFETY
    19             IMPROVEMENTS                                  250,000
    20             (BASE PROJECT ALLOCATION - $200,000)
    21             (LAND ALLOCATION - $25,000)
    22             (DESIGN AND CONTINGENCIES - $25,000)
    23     (F)  US 220
    24         (1)  RECONSTRUCTION AND RELOCATION BETWEEN
    25             US 322 AND I-80                            15,000,000
    26             (BASE PROJECT ALLOCATION - $14,300,000)
    27             (LAND ALLOCATION - $400,000)
    28             (DESIGN AND CONTINGENCIES - $300,000)
    29     (G)  US 322
    30         (1)  PORT MATILDA TO PHILIPSBURG, PAVEMENT
    19970S0185B2061                 - 42 -

     1             REHABILITATION AND SAFETY IMPROVEMENTS      1,400,000
     2             (BASE PROJECT ALLOCATION - $1,200,000)
     3             (DESIGN AND CONTINGENCIES - $200,000)
     4         (2)  STATE COLLEGE BYPASS, PAVEMENT
     5             REHABILITATION AND SAFETY IMPROVEMENTS      1,400,000
     6             (BASE PROJECT ALLOCATION - $1,200,000)
     7             (DESIGN AND CONTINGENCIES - $200,000)
     8         (3)  CENTRE AND MIFFLIN COUNTIES, SEVEN
     9             MOUNTAINS TO LEWISTOWN NARROWS,
    10             PAVEMENT REHABILITATION AND SAFETY
    11             IMPROVEMENTS                                3,600,000
    12             (BASE PROJECT ALLOCATION - $3,200,000)
    13             (DESIGN AND CONTINGENCIES - $400,000)
    14     (H)  US 220 AND SR 0026
    15         (1)  SPRING CREEK TO LOGAN FOUR-LANE
    16             RELOCATION                                  8,640,000
    17             (BASE PROJECT ALLOCATION - $8,640,00)
    18     (I)  CLINTON AVENUE
    19         (1)  WEST COLLEGE AVENUE AND WEST CLINTON
    20             AVENUE CONSTRUCT NEW THREE-LANE
    21             ROADWAY                                       960,000
    22             (BASE PROJECT ALLOCATION - $840,000)
    23             (LAND ALLOCATION - $20,000)
    24             (DESIGN AND CONTINGENCIES - $100,000)
    25     (J)  SR 2012
    26         (1)  RELOCATION OF SEGMENT 10/0000 OF SR
    27             2012 BETWEEN SR 192 AND SEGMENT 20/0000
    28             OF SR 2012 AND WIDEN ROADWAY AND
    29             SHOULDERS TO 24 FEET                          593,000
    30             (BASE PROJECT ALLOCATION - $500,000)
    19970S0185B2061                 - 43 -

     1             (DESIGN AND CONTINGENCIES - $93,000)
     2  Section 315.  Chester County.
     3     (a)  SR 41
     4         (1)  Relocation of SR 41 in Southern
     5             Chester County                             10,000,000  <--
     6             (Design and Contingencies -
     7             $10,000,000)
     8             CHESTER COUNTY BETWEEN DELAWARE STATE                  <--
     9             LINE AND SR 926                            11,900,000
    10             (DESIGN AND CONTINGENCIES -
    11             $11,900,000)
    12         (2)  Upgrade Intersection of SR 41 and SR
    13             796 in Londonderry Township                   665,000
    14             (Base Project Allocation - $600,000)
    15             (Land Allocation - $15,000)
    16             (Design and Contingencies - $50,000)
    17         (3)  Upgrade Intersection of SR 41 and Zook
    18             Road in West Sadsbury Township                665,000
    19             (Base Project Allocation - $600,000)
    20             (Land Allocation - $15,000)
    21             (Design and Contingencies - $50,000)
    22     (b)  US 1
    23         (1)  East Marlborough Township,
    24             Transportation Partnership Overpass         3,000,000
    25             (Base Project Allocation - $2,500,000)
    26             (Land Allocation - $200,000)
    27             (Design and Contingencies - $300,000)
    28         (2)  EAST MARLBOROUGH TOWNSHIP, WIDEN             548,000  <--
    29             (BASE PROJECT ALLOCATION - $500,000)
    30             (LAND ALLOCATION - $48,000)
    19970S0185B2061                 - 44 -

     1     (c)  SR 926
     2         (1)  Resurface, Widen, Install New Drainage
     3             and Improve Intersection Visibility
     4             from Route 352 to Route 202                   675,000
     5             (Base Project Allocation - $325,000)
     6             (Land Allocation - $125,000)
     7             (Design and Contingencies - $225,000)
     8     (d)  US 202
     9         (1)  Signalization of Southbound US 202
    10             Off-Ramp at Intersection with Paoli
    11             Pike, West Goshen Township                    335,000
    12             (Base Project Allocation - $250,000)
    13             (Design and Contingencies - $85,000)
    14         (2)  Engineering study of the capacity and
    15             potential safety improvements to the
    16             ramps, structures and roadway of US 202
    17             between US 30 and Swedesford Road
    18             interchange in East Whiteland               1,500,000
    19             (Design and Contingencies - $1,500,000)
    20         (3)  US 30 TO MOREHALL ROAD, PAVEMENT                      <--
    21             REHABILITATION AND SAFETY IMPROVEMENTS      5,500,000
    22             (BASE PROJECT ALLOCATION - $5,000,000)
    23             (DESIGN AND CONTINGENCIES - $500,000)
    24         (4)  RAMPS AT INTERCHANGE WITH WESTTOWN
    25             ROAD, WEST GOSHEN TOWNSHIP, TURNING
    26             LANES AND SAFETY IMPROVEMENTS                 111,000
    27             (BASE PROJECT ALLOCATION - $101,000)
    28             (LAND ALLOCATION - $2,000)
    29             (DESIGN AND CONTINGENCIES - $8,000)
    30     (e)  Paoli Pike
    19970S0185B2061                 - 45 -

     1         (1)  Install New Storm Water Drainage
     2             System at Two Locations on Paoli Pike
     3             in Willistown Township                        482,000
     4             (Base Project Allocation - $450,000)
     5             (Design and Contingencies - $32,000)
     6     (f)  US 30
     7         (1)  US 30, Coatesville-Downingtown Bypass,
     8             Preliminary Engineering Analysis for
     9             Update from SR 10 West of Coatesville
    10             to Exton Bypass                             1,000,000  <--
    11             TO EXTON BYPASS                             3,800,000  <--
    12         (2)  PA 340 TO BUSINESS 30, RESTORATION,
    13             PAVEMENT REHABILITATION AND SAFETY
    14             IMPROVEMENTS                                1,600,000
    15             (BASE PROJECT ALLOCATION - $1,000,000)
    16             (DESIGN AND CONTINGENCIES - $600,000)
    17     (G)  PA 100
    18         (1)  PUGHTOWN ROAD INTERSECTION,
    19             INTERSECTION IMPROVEMENTS                     280,000
    20             (BASE PROJECT ALLOCATION - $200,000)
    21             (LAND ALLOCATION - $50,000)
    22             (DESIGN AND CONTINGENCIES - $30,000)
    23         (2)  PRIZER ROAD TO PA 28 23, PAVEMENT                     <--
    24             REHABILITATION AND SAFETY IMPROVEMENTS        380,000
    25             (BASE PROJECT ALLOCATION - $280,000)
    26             (DESIGN AND CONTINGENCIES - $100,000)
    27     (H)  PA 003
    28         (1)  DELAWARE COUNTY LINE TO WEST CHESTER
    29             BOROUGH, PAVEMENT REHABILITATION AND
    30             SAFETY IMPROVEMENTS                         1,480,000
    19970S0185B2061                 - 46 -

     1             (BASE PROJECT ALLOCATION - $980,000)
     2             (DESIGN AND CONTINGENCIES - $500,000)
     3     (I)  US 422
     4         (1)  BERKS COUNTY LINE TO MONTGOMERY COUNTY
     5             LINE, PAVEMENT REHABILITATION AND
     6             SAFETY IMPROVEMENTS                           900,000
     7             (BASE PROJECT ALLOCATION - $800,000)
     8             (DESIGN AND CONTINGENCIES - $100,000)
     9     (J)  PA 113
    10         (1)  INTERSECTION WITH SR 0401,
    11             CHANNELIZATION AND SIGNALIZATION              940,000
    12             (BASE PROJECT ALLOCATION - $900,000)
    13             (LAND ALLOCATION - $40,000)
    14     (K)  PA 52
    15         (1)  RELOCATION OF PA 52 SOUTH,
    16             ENGINEERING                                    50,000
    17             (DESIGN AND CONTINGENCIES - $50,000)
    18     (L)  SR 3048
    19         (1)  INTERSECTION OF MCFARLAND ROAD AND
    20             EAST BALTIMORE PIKE, INTERSECTION
    21             IMPROVEMENTS INCLUDING SIGNALS AND LEFT
    22             TURN LANES                                    500,000
    23             (BASE PROJECT ALLOCATION - $400,000)
    24             (LAND ALLOCATION - $40,000)
    25             (DESIGN AND CONTINGENCIES - $60,000)
    26  Section 316.  Clarion County (Reserved).                          <--
    27  SECTION 316.  CLARION COUNTY.                                     <--
    28     (A)  I-80
    29         (1)  WILLIAMSBURG WEST FOR 5.2 MILES,
    30             PAVEMENT REHABILITATION                     1,400,000
    19970S0185B2061                 - 47 -

     1             (BASE PROJECT ALLOCATION - $1,300,000)
     2             (DESIGN AND CONTINGENCIES - $100,000)
     3         (2)  REHABILITATION OF EXITS 6 AND 7,
     4             PAVEMENT REHABILITATION                     1,400,000
     5             (BASE PROJECT ALLOCATION - $1,300,000)
     6             (DESIGN AND CONTINGENCIES - $100,000)
     7         (3)  STRATENVILLE REHABILITATION, PA 68 TO
     8             US 322, PAVEMENT RESTORATION                5,600,000
     9             (BASE PROJECT ALLOCATION - $5,500,000)
    10             (DESIGN AND CONTINGENCIES - $100,000)
    11         (4)  CLARION AND JEFFERSON COUNTIES FROM
    12             VENANGO COUNTY TO CLEARFIELD COUNTY,
    13             PAVEMENT REHABILITATION, INTERCHANGE
    14             RECONSTRUCTION AND SAFETY IMPROVEMENTS      1,100,000
    15             (BASE PROJECT ALLOCATION - $1,000,000)
    16             (DESIGN AND CONTINGENCIES - $100,000)
    17     (B)  PA 28
    18         (1)  NEW BETHLEHEM, PAVEMENT REHABILITATION
    19             AND SAFETY IMPROVEMENTS                       520,000
    20             (BASE PROJECT ALLOCATION - $400,000)
    21             (DESIGN AND CONTINGENCIES - $120,000)
    22     (C)  PA 66
    23         (1)  EXIT 8 ON I-80 TO TR 322, PAVEMENT
    24             REHABILITATION AND SAFETY IMPROVEMENTS        620,000
    25             (BASE PROJECT ALLOCATION - $600,000)
    26             (DESIGN AND CONTINGENCIES - $20,000)
    27  Section 317.  Clearfield County.
    28     (a)  I-80
    29         (1)  Jefferson County Line to Centre County
    30             Line, Pavement Rehabilitation and
    19970S0185B2061                 - 48 -

     1             Safety Improvements                         4,100,000
     2             (Base Project Allocation - $3,670,000)
     3             (Land Allocation - $20,000)
     4             (Design and Contingencies - $410,000)
     5         (2)  WESTERN CLEARFIELD COUNTY, 23 MILES,                  <--
     6             PAVEMENT RESTORATION                        3,100,000
     7             (BASE PROJECT ALLOCATION - $3,000,000)
     8             (DESIGN AND CONTINGENCIES - $100,000)
     9     (b)  US 219
    10         (1)  SR 219 and SR 4019, South of Dubois,
    11             Add Two-Way Left Turn Lane                    188,000
    12             (Base Project Allocation - $138,000)
    13             (Land Allocation - $30,000)
    14             (Design and Contingencies - $20,000)
    15         (2)  EXIT 16 INTERCHANGE WITH PA 830,                      <--
    16             PAVEMENT RESTORATION                        3,100,000
    17             (BASE PROJECT ALLOCATION - $3,000,000)
    18             (DESIGN AND CONTINGENCIES - $100,000)
    19         (3)  DUBOIS TO I-80, EXPAND TO FOUR LANES         340,000
    20             (BASE PROJECT ALLOCATION - $240,000)
    21             (LAND ALLOCATION - $40,000)
    22             (DESIGN AND CONTINGENCIES - $60,000)
    23         (4)  JARED AND BRADY STREETS, RECONSTRUCT
    24             TO ESTABLISH ONE-WAY SYSTEM                   700,000
    25             (BASE PROJECT ALLOCATION - $500,000)
    26             (LAND ALLOCATION - $100,000)
    27             (DESIGN AND CONTINGENCIES - $100,000)
    28     (C)  ROCKTON MOUNTAIN
    29         (1)  INTELLIGENT TRANSPORTATION SYSTEMS           740,000
    30             (BASE PROJECT ALLOCATION - $690,000)
    19970S0185B2061                 - 49 -

     1             (DESIGN AND CONTINGENCIES - $50,000)
     2     (D)  PA 153                                                    <--
     3         (1)  CROOKED SEWER ROAD, FROM RAMEY TO
     4             HENDERSON, BIGLER TOWNSHIP,
     5             CONSTRUCTION OF TWO-LANE RELOCATION         4,960,000
     6             (BASE PROJECT ALLOCATION - $4,400,000)
     7             (LAND ALLOCATION - $120,000)
     8             (DESIGN AND CONTINGENCIES - $440,000)
     9     (E)  CLEARFIELD BOROUGH
    10         (1)  UPDATE SIGNALS AND EQUIPMENT IN
    11             CLEARFIELD BOROUGH                            120,000
    12             (BASE PROJECT ALLOCATION - $60,000)
    13             (DESIGN AND CONTINGENCIES - $60,000)
    14     (F)  US 220
    15         (1)  RECONSTRUCTION OF US 220 FROM US 322
    16             TO I-80, MARTHA FURNACE TO MILESBURG
    17             INTERCHANGE                                 4,080,000  <--
    18             INTERCHANGE                                 4,880,000  <--
    19             (Base Project Allocation - $3,800,000)
    20             (Land Allocation - $80,000)
    21             (Design and Contingencies - $1,000,000)
    22     (g)  SR 350
    23         (1)  Bypass of Philipsburg, Relocation of 2
    24             Lanes and Construction of Climbing
    25             Lane                                        2,350,000
    26             (Base Project Allocation - $2,225,000)
    27             (Land Allocation - $50,000)
    28             (Design and Contingencies - $75,000)
    29  Section 318.  Clinton County.
    30     (a)  I-80
    19970S0185B2061                 - 50 -

     1         (1)  Centre County Line to Union County
     2             Line, Pavement Rehabilitation and
     3             Safety Improvements                         2,400,000
     4             (Base Project Allocation - $2,148,000)
     5             (Land Allocation - $12,000)
     6             (Design and Contingencies - $240,000)
     7         (2)  INTELLIGENT TRANSPORTATION SYSTEMS,                   <--
     8             VARIABLE MESSAGE SIGN AND WEATHER
     9             STATION                                       500,000
    10             (BASE PROJECT ALLOCATION - $500,000)
    11  Section 319.  Columbia County.
    12     (a)  PA 54
    13         (1)  PA 54/61 and PA 42, Village of
    14             Centralia, Restoration                        150,000
    15             (Base Project Allocation - $120,000)
    16             (Land Allocation - $6,000)
    17             (Design and Contingencies - $24,000)
    18     (b)  PA 487
    19         (1)  Knoebels Access Road, Franklin
    20             Township, Intersection and Access
    21             Improvements                                  300,000
    22             (Base Project Allocation - $180,000)
    23             (Land Allocation - $20,000)
    24             (Design and Contingencies - $100,000)
    25     (C)  I-80                                                      <--
    26         (1)  EXIT 34, BUCKHORN INTERCHANGE,
    27             PAVEMENT REHABILITATION AND SAFETY
    28             IMPROVEMENTS                                  620,000
    29             (BASE PROJECT ALLOCATION - $600,000)
    30             (LAND ALLOCATION - $5,000)
    19970S0185B2061                 - 51 -

     1             (DESIGN AND CONTINGENCIES - $15,000)
     2         (2)  LIME RIDGE INTERCHANGE, PAVEMENT
     3             RESTORATION                                   500,000
     4             (BASE PROJECT ALLOCATION - $450,000)
     5             (DESIGN AND CONTINGENCIES - $50,000)
     6     (D)  SR 11                                                     <--
     7         (1)  US 11 AND PA 42, TOWN OF BLOOMSBURG,
     8             INTERCHANGE ADJUSTMENTS, ACCESS
     9             IMPROVEMENTS, AND SR 4003 BRIDGE
    10             REMOVAL COORDINATED WITH RIVER LEVEE
    11             CONSTRUCTION                                2,500,000
    12             (BASE PROJECT ALLOCATION - $2,000,000)
    13             (DESIGN AND CONTINGENCIES - $500,000)
    14  Section 320.  Crawford County.
    15     (a)  I-79
    16         (1)  Northbound and Southbound Rest Areas
    17             (Sites 19 and 20), Sewage Treatment
    18             Plant Improvements, Length 0.5 Mile         1,150,000
    19             (Base Project Allocation - $1,000,000)
    20             (Design and Contingencies - $150,000)
    21         (2)  MERCER COUNTY LINE TO ERIE COUNTY                     <--
    22             LINE, PAVEMENT REHABILITATION AND
    23             SAFETY IMPROVEMENTS                         3,100,000
    24             (BASE PROJECT ALLOCATION - $3,000,000)
    25             (DESIGN AND CONTINGENCIES - $100,000)
    26     (b)  SR 8
    27         (1)  Intersection Improvements at SR 8 and
    28             SR 27 to Provide Additional Truck
    29             Turning Radii                                 205,000
    30             (Base Project Allocation - $160,000)
    19970S0185B2061                 - 52 -

     1             (Land Allocation - $10,000)
     2             (Design and Contingencies - $35,000)
     3         (2)  PA 8 AND PA 408, ADD LANES AND                        <--
     4             INTERSECTION IMPROVEMENTS                     325,000
     5             (BASE PROJECT ALLOCATION - $265,000)
     6             (LAND ALLOCATION - $40,000)
     7             (DESIGN AND CONTINGENCIES - $20,000)
     8     (c)  SR 27
     9         (1)  Install New Signals at Intersections
    10             within City of Meadville                      275,000
    11             (Base Project Allocation - $225,000)
    12             (Land Allocation - $20,000)
    13             (Design and Contingencies - $30,000)
    14         (2)  Various Corridor and Spot Improvements
    15             on SR 27 between Meadville and
    16             Titusville                                  7,000,000
    17             (Base Construction Allocation -
    18             $6,000,000)
    19             (Land Allocation - $400,000)
    20             (Design and Contingencies - $600,000)
    21     (d)  SR 77
    22         (1)  Various Corridor and Spot Improvements
    23             on SR 77, SR 408 and SR 1010 between
    24             Meadville and Titusville                    7,000,000
    25             (Base Construction Allocation - $
    26             6,000,000)
    27             (Land Allocation - $400,000)
    28             (Design and Contingencies - $600,000)
    29     (E)  PA 198                                                    <--
    30         (1)  SAEGERTOWN ROAD, INTERSECTION
    19970S0185B2061                 - 53 -

     1             IMPROVEMENT                                   106,000
     2             (BASE PROJECT ALLOCATION - $100,000)
     3             (DESIGN AND CONTINGENCIES - $6,000)
     4  Section 321.  Cumberland County.
     5     (a)  I-81
     6         (1)  Exit 12, Interchange with PA 465,
     7             Interchange Improvements                    1,520,000
     8             (Base Construction Allocation -
     9             $1,200,000)
    10             (Land Allocation - $20,000)
    11             (Design and Contingencies - $300,000)
    12         (2)  FRANKLIN COUNTY LINE TO STOUGHSTOWN,                  <--
    13             PAVEMENT REHABILITATION AND SAFETY
    14             IMPROVEMENTS                                1,210,000
    15             (BASE PROJECT ALLOCATION - $1,000,000)
    16             (LAND ALLOCATION - $10,000)
    17             (DESIGN AND CONTINGENCIES - $200,000)
    18         (3)  CUMBERLAND WEST, RESURFACING PAVEMENT,
    19             REHABILITATION AND SAFETY IMPROVEMENTS      9,790,000
    20             (BASE PROJECT ALLOCATION - $9,480,000)
    21             (LAND ALLOCATION - $10,000)
    22             (DESIGN AND CONTINGENCIES - $300,000)
    23         (4)  HAMPTON EAST PM, PA 114 TO GEORGE WADE
    24             BRIDGE, PAVEMENT REHABILITATION AND
    25             SAFETY IMPROVEMENTS                         1,388,000
    26             (BASE PROJECT ALLOCATION - $1,358,000)
    27             (DESIGN AND CONTINGENCIES - $30,000)
    28         (5)  US 11 TO PA 114, PAVEMENT RESTORATION      7,810,000
    29             (BASE PROJECT ALLOCATION - $7,540,000)
    30             (DESIGN AND CONTINGENCIES - $270,000)
    19970S0185B2061                 - 54 -

     1     (6)  INTERCHANGE WITH PA 944, TRANSPORTATION                   <--
     2         IMPROVEMENTS AROUND INTERCHANGE                   500,000
     3             (BASE PROJECT ALLOCATION - $400,000)
     4             (LAND ALLOCATION - $50,000)
     5             (DESIGN AND CONTINGENCIES - $50,000)
     6     (B)  I-83
     7         (1)  INTERCHANGE WITH PA 581 AND PA 114
     8             EXIT 18 TO SUSQUEHANNA RIVER,
     9             INTERCHANGE DESIGN ALTERNATIVE                 90,000
    10             (DESIGN AND CONTINGENCIES - $90,000)
    11     (C)  US 15
    12         (1)  PA 581 TO DILLSBURG, PAVEMENT
    13             RESTORATION                                 8,100,000
    14             (BASE PROJECT ALLOCATION - $8,000,000)
    15             (DESIGN AND CONTINGENCIES - $100,000)
    16         (2)  US 11, RANGE ROAD TO CUMBERLAND COUNTY
    17             LINE, PAVEMENT RESTORATION AND SAFETY
    18             IMPROVEMENTS                                1,310,000
    19             (BASE PROJECT ALLOCATION - $1,000,000)
    20             (LAND ALLOCATION - $10,000)
    21             (DESIGN AND CONTINGENCIES - $300,000)
    22     (D)  PA 114
    23         (1)  I-81 TO US 11, SILVER SPRING TOWNSHIP,
    24             PAVEMENT RESTORATION AND SAFETY
    25             IMPROVEMENTS                                  720,000
    26             (BASE PROJECT ALLOCATION - $460,000)
    27             (LAND ALLOCATION - $10,000)
    28             (DESIGN AND CONTINGENCIES - $250,000)
    29     (E)  SR 581
    30         (1)  INSTALLATION OF NOISE BARRIERS ON SR
    19970S0185B2061                 - 55 -

     1             581 FROM I-83 INTERSECTION TO SPORTING
     2             HILL                                       21,000,000
     3             (BASE PROJECT ALLOCATION - $18,000,000)
     4             (LAND ALLOCATION - $1,500,000)
     5             (DESIGN AND CONTINGENCIES - $1,500,000)
     6     (F)  SR 1015
     7         (1)  21ST STREET TO PA 944, RELOCATION,
     8             WIDENING AND RECONSTRUCTION                   391,000
     9             (BASE PROJECT ALLOCATION - $391,000)
    10  Section 322.  Dauphin County.
    11     (a)  I-283
    12         (1)  PA 441 to I-76, Pavement
    13             Rehabilitation and Safety Improvements        200,000
    14             (Base Project Allocation - $179,000)
    15             (Land Allocation - $1,000)
    16             (Design and Contingencies - $20,000)
    17         (2)  PA 283 TO I-83, RESTORATION                1,570,000  <--
    18             (BASE PROJECT ALLOCATION - $1,479,000)
    19             (LAND ALLOCATION - $1,000)
    20             (DESIGN AND CONTINGENCIES - $90,000)
    21     (b)  PA 283
    22         (1)  I-283 to PA 341, Pavement
    23             Rehabilitation and Safety Improvements      6,962,000
    24             (Base Project Allocation - $6,500,000)
    25             (Land Allocation - $2,000)
    26             (Design and Contingencies - $460,000)
    27     (c)  US 22
    28         (1)  Construction of Pedestrian Tunnel or
    29             Overhead Crossing of US 22 near Manor
    30             Drive in West Hanover Township              3,250,000
    19970S0185B2061                 - 56 -

     1             (Base Project Allocation - $3,000,000)
     2             (Land Allocation - $100,000)
     3             (Design and Contingencies - $150,000)
     4     (d)  Pleasant View Road
     5         (1)  Install New Signals and Reconstruct
     6             Highway-Railroad Grade Crossing on
     7             Pleasant View Road, South Hanover
     8             Township                                      190,000
     9             (Base Project Allocation - $150,000)
    10             (Land Allocation - $20,000)
    11             (Design and Contingencies - $20,000)
    12     (e)  I-81                                                      <--
    13         (1)  Installation of sound barriers on
    14             north and south sides of I-81 from
    15             intersection with I-83 to Mountain Road
    16             Interchange                                 5,300,000
    17             (Base Project Allocation - $5,000,000)
    18             (Design and Contingencies - $300,000)
    19     (f) (E)  PA 225                                                <--
    20         (1)  Briardale Road to PA 325, Middle
    21             Paxton Township, Resurfacing                  116,000
    22             (Base Project Allocation - $116,000)
    23     (g)  PA 225                                                    <--
    24         (1) (2)  South Road to Briardale Road,                     <--
    25             Middle Paxton Township, Widen to Three
    26             Lanes                                         111,000
    27             (Base Project Allocation - $111,000)
    28         (3)  SOUTH ROAD TO PA 325, MIDDLE PAXTON                   <--
    29             TOWNSHIP, RESURFACE                           227,000
    30             (BASE PROJECT ALLOCATION - $227,000)
    19970S0185B2061                 - 57 -

     1     (F)  I-83
     2         (1)  19TH STREET TO I-81, RESTORATION          12,000,000
     3             (BASE PROJECT ALLOCATION - $10,000,000)
     4             (LAND ALLOCATION - $500,000)
     5             (DESIGN AND CONTINGENCIES - $1,500,000)
     6         (2)  UNION DEPOSIT TO I-81, ENGINEERING         1,400,000
     7             (DESIGN AND CONTINGENCIES - $1,400,000)
     8     (G)  US 322
     9         (1)  PENN HARRIS INTERCHANGE TO LEBANON
    10             COUNTY LINE, PAVEMENT RESTORATION           1,610,000
    11             (BASE PROJECT ALLOCATION - $1,300,000)
    12             (LAND ALLOCATION - $10,000)
    13             (DESIGN AND CONTINGENCIES - $300,000)
    14     (H)  SR 39
    15         (1)  INTERSECTION WITH I-81, INTERSECTION
    16             IMPROVEMENTS                                3,400,000
    17             (BASE PROJECT ALLOCATION - $3,200,000)
    18             (DESIGN AND CONTINGENCIES - $200,000)
    19     (I)  SR 3015
    20         (1)  VALLEY ROAD TO PAXTON CHURCH ROAD,
    21             RECONSTRUCTION, WIDENING AND
    22             INTERSECTION IMPROVEMENTS                     993,000
    23             (BASE PROJECT ALLOCATION - $993,000)
    24  Section 323.  Delaware County.
    25     (a)  US 30
    26         (1)  Ithan Avenue, Villanova University,
    27             Pedestrian Tunnel and Turn Lanes              600,000
    28             (Base Project Allocation - $600,000)
    29     (b)  I-95                                                      <--
    30         (1)  Install Sound Barriers on I-95 on East
    19970S0185B2061                 - 58 -

     1             Side from SR 420 to SR 291                  2,100,000
     2             (Base Project Allocation - $2,000,000)
     3             (Design and Contingencies - $100,000)
     4     (c) (B)  P & W Bike/Pedestrian Trail                           <--
     5         (1)  Radnor Township, Bikeway                     140,000
     6             (Base Project Allocation - $112,000)
     7             (Design and Contingencies - $28,000)
     8     (C)  I-476                                                     <--
     9         (1)  US 1 TO PA 3, INTERCHANGE
    10             IMPROVEMENTS                                  100,000
    11             (BASE PROJECT ALLOCATION - $80,000)
    12             (LAND ALLOCATION - $10,000)
    13             (DESIGN AND CONTINGENCIES - $10,000)
    14     (D) (C)  PA 252                                                <--
    15         (1)  CONNECT PA 252 NEAR WINDING WAY WITH
    16             PA 3 NEAR ROE ROAD, CONSTRUCT NEW
    17             ROADWAY                                     1,900,000
    18             (BASE PROJECT ALLOCATION - $1,500,000)
    19             (LAND ALLOCATION - $100,000)
    20             (DESIGN AND CONTINGENCIES - $300,000)
    21         (2)  US 1 TO PA 3, INTERCHANGE
    22             IMPROVEMENTS                                  416,000
    23             (BASE PROJECT ALLOCATION - $360,000)
    24             (LAND ALLOCATION - $20,000)
    25             (DESIGN AND CONTINGENCIES - $36,000)
    26         (3)  PA 252/PA 3 CONNECTOR FROM PA 3 TO
    27             CHESTER COUNTY LINE, INTERSECTION AND
    28             SAFETY IMPROVEMENTS                           179,000
    29             (BASE PROJECT ALLOCATION - $139,000)
    30             (LAND ALLOCATION - $16,000)
    19970S0185B2061                 - 59 -

     1             (DESIGN AND CONTINGENCIES - $24,000)
     2     (E) (D)  PA 3                                                  <--
     3         (1)  PA 252 TO I-476, INTERSECTION AND
     4             CORRIDOR IMPROVEMENTS                         280,000
     5             (BASE PROJECT ALLOCATION - $240,000)
     6             (LAND ALLOCATION - $20,000)
     7             (DESIGN AND CONTINGENCIES - $20,000)
     8     (F) (E)  US 202                                                <--
     9         (1)  BALTIMORE PIKE TO STREET ROAD,
    10             PAVEMENT REHABILITATION AND SAFETY
    11             IMPROVEMENTS                                  500,000
    12             (BASE PROJECT ALLOCATION - $300,000)
    13             (DESIGN AND CONTINGENCIES - $200,000)
    14     (G) (F)  SR 2016                                               <--
    15         (1)  SIGNAL IMPROVEMENTS ON SR 2016 FROM
    16             WALLINGFORD ROAD TO BISHOP AVENUE,
    17             SPRINGFIELD TOWNSHIP                          125,000
    18             (BASE PROJECT ALLOCATION - $101,000)
    19             (DESIGN AND CONTINGENCIES - $24,000)
    20     (H) (G)  US 322                                                <--
    21         (1)  WIDENING AND INTERSECTION IMPROVEMENTS
    22             FROM US 1 TO ROUTE 452, WIDEN FROM TWO
    23             TO FOUR LANES                              45,000,000
    24             (BASE PROJECT ALLOCATION - $45,000,000)
    25     (I) (H)  CHESTER WATERFRONT                                    <--
    26         (1)  ACCESS FROM I-95 AND US 322, WIDEN OR
    27             LOWER OR BOTH GRADES TO INCREASE
    28             VERTICAL CLEARANCE AT AMTRAK
    29             UNDERPASSES ON HIGHLAND AVENUE, FLOWER
    30             STREET, ENGLE STREET AND MORTON AVENUE      5,000,000
    19970S0185B2061                 - 60 -

     1             (BASE PROJECT ALLOCATION - $5,000,000)
     2     (J) (I)  PA 291                                                <--
     3         (1)  WIDENING AND ENVIRONMENTAL REMEDIATION
     4             FROM FRANKLIN STREET TO TRAINER BOROUGH
     5             LINE, WIDEN FROM TWO TO FOUR LANES PLUS
     6             A PASSING LANE                             21,500,000
     7             (BASE PROJECT ALLOCATION - $20,500,000)
     8             (ENVIRONMENTAL REMEDIATION -
     9             $1,000,000)
    10     (K) (J)  US 202                                                <--
    11         (1)  WIDENING TO SIX LANES, AND FROM
    12             DELAWARE STATE LINE TO CHESTER COUNTY
    13             LINE, WIDEN FROM FOUR TO SIX LANES        100,000,000
    14             (BASE PROJECT ALLOCATION -
    15             $100,000,000)
    16     (L) (K)  I-476                                                 <--
    17         (1)  WIDEN FOUR-LANE PORTION TO SIX LANES,
    18             FROM I-95 TO PA 3                         100,000,000
    19             (BASE PROJECT ALLOCATION -
    20             $100,000,000)
    21     (M) (L)  STEVENS DRIVE                                         <--
    22         (1)  GRADE CROSSING IN TINICUM TOWNSHIP         2,500,000
    23             (BASE PROJECT ALLOCATION - $2,500,000)
    24     (N) (M)  MEDIA BOROUGH                                         <--
    25         (1)  REPAIR DAM UNDER THIRD STREET IN
    26             MEDIA, REPAIR EARTHEN DAM UNDER THIRD
    27             STREET IN MEDIA BOROUGH JUST WEST OF
    28             THIRD STREET AND WEST STREET
    29             INTERSECTION                                  500,000
    30             (BASE PROJECT ALLOCATION - $500,000)
    19970S0185B2061                 - 61 -

     1     (O) (N)  I-95                                                  <--
     2         (1)  CONSTRUCTION OF SOUTHBOUND ENTRANCE TO
     3             I-95 AT EDGEMONT AVENUE                     5,700,000
     4             (BASE PROJECT ALLOCATION - $5,700,000)
     5     (2)  I-95/PHILADELPHIA INTERNATIONAL AIRPORT,                  <--
     6         INTERCHANGE AND ACCESS IMPROVEMENTS            90,000,000
     7             (BASE PROJECT ALLOCATION - $80,000,000)
     8             (LAND ALLOCATION - $1,000,000)
     9             (DESIGN AND CONTINGENCIES - $9,000,000)
    10  SECTION 323.1.  DISTRICT FOUR.
    11     (A)  DISTRICT FOUR PROJECTS
    12         (1)  VARIOUS STATE ROUTES, DAYLIGHT
    13             INTERSECTIONS AT VARIOUS LOCATIONS,
    14             SAFETY IMPROVEMENTS                            72,000
    15             (BASE PROJECT ALLOCATION - $55,000)
    16             (LAND ALLOCATION - $10,000)
    17             (DESIGN AND CONTINGENCIES - $7,000)
    18  Section 324.  Elk County.
    19     (a)  Osterhout Street
    20         (1)  From SR 120 Intersection to SR 219
    21             Intersection, Reconstruct to 24 Feet        3,585,000
    22             (Base Project Allocation - $2,500,000)
    23             (Land Allocation - $600,000)
    24             (Design and Contingencies - $485,000)
    25     (b)  Elk County Industrial Park Access Road
    26         (1)  SR 120, SR 255, SR 1001, SR 1002, SR
    27             1003 and SR 1008, Reconstruct to 24
    28             Feet                                        2,882,000
    29             (Base Project Allocation - $2,632,000)
    30             (Land Allocation - $100,000)
    19970S0185B2061                 - 62 -

     1             (Design and Contingencies - $150,000)
     2     (c)  US 219
     3         (1)  Relocation of Allegheny & Eastern
     4             Track to Allow for the Construction of
     5             a US 219 Bypass of Johnsonburg              5,100,000
     6             (Base Construction Allocation -
     7             $3,900,000)
     8             (Land Allocation - $1,000,000)
     9             (Design and Contingencies - $200,000)
    10     (D)  PA 255                                                    <--
    11         (1)  JOHNSONBURG CLIMBING LANE, ADD TRUCK
    12             CLIMBING LANE                                 460,000
    13             (BASE PROJECT ALLOCATION - $400,000)
    14             (LAND ALLOCATION - $20,000)
    15             (DESIGN AND CONTINGENCIES - $40,000)
    16     (E)  PA 120
    17         (1)  ST. MARY'S NETWORK TRAFFIC PATTERN
    18             REVISIONS AT VARIOUS LOCATIONS              1,014,000
    19             (BASE PROJECT ALLOCATION - $714,000)
    20             (LAND ALLOCATION - $180,000)
    21             (DESIGN AND CONTINGENCIES - $120,000)
    22     (F)  SR 1014
    23         (1)  FROM SR 120 TO SR 219, RECONSTRUCTION      1,265,000
    24             (BASE PROJECT ALLOCATION - $950,000)
    25             (LAND ALLOCATION - $190,000)
    26             (DESIGN AND CONTINGENCIES - $125,000)
    27     (G)  T-520
    28         (1)  CONVERT TO STATE ROAD AND RECONSTRUCT                 <--
    29             TO PROMOTE ELK-HERD TOURISM IN
    30             BENEZETTE TOWNSHIP                            500,000
    19970S0185B2061                 - 63 -

     1     (H)  T-647
     2         (1)  CONVERT TO STATE ROAD AND RECONSTRUCT
     3             IN JADE TOWNSHIP                            1,000,000
     4  Section 325.  Erie County.
     5     (a)  SR 4024
     6         (1)  SR 4024 Extension, US 19 to Bush
     7             Industrial Road, Summit Township,
     8             Construct New Roadway and Intersection
     9             Improvements                                  620,000
    10             (Base Project Allocation - $400,000)
    11             (Land Allocation - $120,000)
    12             (Design and Contingencies - $100,000)
    13     (b)  I-79
    14         (1)  Crawford County Line to I-90 LAKE ERIE                <--
    15             in Erie County, Pavement Rehabilitation
    16             and Safety Improvements                     1,900,000
    17             (Base Project Allocation - $1,700,000)
    18             (Land Allocation - $10,000)
    19             (Design and Contingencies - $190,000)
    20     (c)  SR 3006
    21         (1)  From Bridge to Erie Street, Borough of
    22             Edinboro, Add Turn Lanes                       64,000
    23             (Base Project Allocation - $44,000)
    24             (Land Allocation - $10,000)
    25             (Design and Contingencies - $10,000)
    26     (d)  SR 4034
    27         (1)  City of Erie, East Side Access, Port                  <--
    28             Access Road to East 6th Street, new
    29             two-lane roadway                            1,176,000
    30             (Base Project Allocation - $647,000)
    19970S0185B2061                 - 64 -

     1             (Land Allocation - $329,000)
     2             (Design and Contingencies - $200,000)
     3         (2)  City of Erie, East Side Access, East
     4             6th Street to East 12th Street, new
     5             two-lane roadway                              830,000
     6             (Base Project Allocation - $30,000)
     7             (Land Allocation - $440,000)
     8             (Design and Contingencies - $360,000)
     9         (3)  City of Erie, East Side Access, Port
    10             Access Road, Larson Text Right-of-Way
    11             Acquisition                                   200,000
    12             (Land Allocation - $200,000)
    13         (4) (1)  CITY OF ERIE, PORT ACCESS TO I-90                 <--
    14             NEW FOUR-LANE ROADWAY                      20,434,000
    15             (BASE PROJECT ALLOCATION - $16,000,000)
    16             (LAND ALLOCATION - $2,400,000)
    17             (DESIGN AND CONTINGENCIES - $2,034,000)
    18         (5) (2)  EAST SIDE ACCESS CORRIDOR, TMS                    <--
    19             IMPROVEMENTS                                  800,000
    20             (BASE PROJECT ALLOCATION - $600,000)
    21             (LAND ALLOCATION - $100,000)
    22             (DESIGN AND CONTINGENCIES - $100,000)
    23     (e)  SR 4016
    24         (1)  West 38th Street, Shunpike Road to
    25             Myrtle Street, Realignment/Relocation         940,000
    26             (Base Project Allocation - $800,000)
    27             (Land Allocation - $50,000)
    28             (Design and Contingencies - $90,000)
    29     (f)  SR 0299
    30         (1)  Millcreek Township, Powell Avenue
    19970S0185B2061                 - 65 -

     1             Relocation                                  6,300,000
     2             (Base Project Allocation - $4,700,000)
     3             (Land Allocation - $600,000)
     4             (Design and Contingencies - $1,000,000)
     5     (g)  SR 4024
     6         (1)  Summit Township, Robinson Road
     7             Extensions                                 11,300,000
     8             (Base Project Allocation - $9,800,000)
     9             (Land Allocation - $700,000)
    10             (Design and Contingencies - $800,000)
    11     (h)  SR 4026
    12         (1)  Millcreek Township, South Hill Road
    13             Extensions                                  6,200,000
    14             (Base Project Allocation - $4,800,000)
    15             (Land Allocation - $750,000)
    16             (Design and Contingencies - $650,000)
    17     (I)  I-90                                                      <--
    18         (1)  VARIOUS LOCATIONS, PAVEMENT
    19             REHABILITATION AND SAFETY IMPROVEMENTS      1,100,000
    20             (BASE PROJECT ALLOCATION - $1,000,000)
    21             (DESIGN AND CONTINGENCIES - $100,000)
    22     (J)  US 19
    23         (1)  US 19 AND INTERCHANGE ROAD,
    24             INTERSECTION IMPROVEMENT                    2,000,000
    25             (BASE PROJECT ALLOCATION - $1,700,000)
    26             (LAND ALLOCATION - $200,000)
    27             (DESIGN AND CONTINGENCIES - $100,000)
    28         (2)  US 19 TO BUSH INDUSTRIAL ROAD IN
    29             SUMMIT TOWNSHIP, CONSTRUCT NEW ROADWAY
    30             AND INTERSECTION IMPROVEMENTS                 620,000
    19970S0185B2061                 - 66 -

     1             (BASE PROJECT ALLOCATION - $400,000)
     2             (LAND ALLOCATION - $120,000)
     3             (DESIGN AND CONTINGENCIES - $100,000)
     4     (K)  SR 0000
     5         (1)  19TH STREET IN MILLCREEK TOWNSHIP TO
     6             DOWNING AVENUE IN CITY OF ERIE, REMOVE
     7             RAIL LINE AND AT-GRADE CROSSINGS            1,400,000
     8             (BASE PROJECT ALLOCATION - $1,200,000)
     9             (LAND ALLOCATION - $60,000)
    10             (DESIGN AND CONTINGENCIES - $140,000)
    11  Section 326.  Fayette County.
    12     (a)  SR 21
    13         (1)  SR 21 from Uniontown to Masontown,
    14             Safety Improvements                         2,000,000
    15             (Design and Contingencies - $2,000,000)
    16         (2)  UNIONTOWN TO WAYNESBURG IN GREENE                     <--
    17             COUNTY, PAVEMENT REHABILITATION             2,600,000
    18             (BASE PROJECT ALLOCATION - $2,080,000)
    19             (LAND ALLOCATION - $260,000)
    20             (DESIGN AND CONTINGENCIES - $260,000)
    21     (b)  SR 711
    22         (1)  SR 711 in Connellsville, Safety
    23             Improvements                                  400,000
    24             (Design and Contingencies - $400,000)
    25     (C)  PA 201                                                    <--
    26         (1)  ADELAIDE ROAD TO DUNBAR TOWNSHIP LINE,
    27             PAVEMENT RESTORATION AND SAFETY
    28             IMPROVEMENTS                                  440,000
    29             (BASE PROJECT ALLOCATION - $400,000)
    30             (LAND ALLOCATION - $20,000)
    19970S0185B2061                 - 67 -

     1             (DESIGN AND CONTINGENCIES - $20,000)
     2         (2)  VANDERBILT BRIDGE TO PA 201, PAVEMENT
     3             REHABILITATION AND SAFETY IMPROVEMENTS        840,000
     4             (BASE PROJECT ALLOCATION - $800,000)
     5             (LAND ALLOCATION - $20,000)
     6             (DESIGN AND CONTINGENCIES - $20,000)
     7  Section 327.  Forest County.
     8     (a)  SR 666
     9         (1)  Beaver Run Bridge to Whig Hill
    10             Highway, Restoration                          980,000
    11             (Base Project Allocation - $800,000)
    12             (Land Allocation - $30,000)
    13             (Design and Contingencies - $150,000)
    14         (2)  Whig Hill to Little Minister Run
    15             Bridge, Restoration                         1,380,000
    16             (Base Project Allocation - $1,200,000)
    17             (Land Allocation - $30,000)
    18             (Design and Contingencies - $150,000)
    19         (3)  East of Upper Sheriff Creek to West of
    20             Porcupine Run Bridge, Restoration           2,230,000
    21             (Base Project Allocation - $2,000,000)
    22             (Land Allocation - $30,000)
    23             (Design and Contingencies - $200,000)
    24         (4)  West of Porcupine Run Bridge to Bobbs
    25             Creek Bridge, Restoration                   1,530,000
    26             (Base Project Allocation - $1,300,000)
    27             (Land Allocation - $30,000)
    28             (Design and Contingencies - $200,000)
    29         (5)  Bobbs Creek Bridge to Little Minister
    30             Run Bridge, Restoration                     1,230,000
    19970S0185B2061                 - 68 -

     1             (Base Project Allocation - $1,000,000)
     2             (Land Allocation - $30,000)
     3             (Design and Contingencies - $200,000)
     4         (6)  Village of Lynch to Village of Whig
     5             Hill, Howe and Kingsley Townships,
     6             Reconstruction                             16,500,000
     7             (Base Project Allocation - $14,000,000)
     8             (Land Allocation - $1,000,000)
     9             (Design and Contingencies - $1,500,000)
    10         (7)  US 62 TO PA 948, ROADWAY                              <--
    11             RECONSTRUCTION                             23,850,000
    12             (BASE PROJECT ALLOCATION - $20,300,000)
    13             (LAND ALLOCATION - $1,150,000)
    14             (DESIGN AND CONTINGENCIES - $2,400,000)
    15     (B)  SR 66
    16         (1)  REHABILITATION SR 66 FROM MARIENVILLE
    17             TO CLARION COUNTY LINE                      1,280,000
    18     (C)  SR 2005
    19         (1)  PAVE SR 2005 ALONG WITH SEVEN MILES OF
    20             TOWNSHIP ROAD                               3,000,000
    21  Section 328.  Franklin County (Reserved).                         <--
    22  SECTION 328.  FRANKLIN COUNTY.                                    <--
    23     (A)  I-81
    24         (1)  EXIT 2 TO EXIT 3, ANTRIM TOWNSHIP,
    25             CONSTRUCT CONNECTOR ROAD                    2,000,000
    26             (BASE PROJECT ALLOCATION - $1,700,000)
    27             (LAND ALLOCATION - $100,000)
    28             (DESIGN AND CONTINGENCIES - $200,000)
    29         (2)  GREENE TOWNSHIP, PAVEMENT
    30             REHABILITATION AND SAFETY IMPROVEMENTS      2,073,000
    19970S0185B2061                 - 69 -

     1             (BASE PROJECT ALLOCATION - $1,972,000)
     2             (LAND ALLOCATION - $1,000)
     3             (DESIGN AND CONTINGENCIES - $100,000)
     4         (3)  EXIT 2 RAMP, ACCESS AND SAFETY
     5             IMPROVEMENTS                                  175,000
     6             (BASE PROJECT ALLOCATION - $140,000)
     7             (LAND ALLOCATION - $18,000)
     8             (DESIGN AND CONTINGENCIES - $17,000)
     9     (B)  US 30
    10         (1)  INTERSECTION WITH HADE ROAD, SIGNAL
    11             IMPROVEMENT                                    57,000
    12             (BASE PROJECT ALLOCATION - $11,000)
    13             (LAND ALLOCATION - $1,000)
    14             (DESIGN AND CONTINGENCIES - $45,000)
    15         (2)  INTERSECTION WITH JACK ROAD, SIGNAL
    16             IMPROVEMENTS                                   57,000
    17             (BASE PROJECT ALLOCATION - $11,000)
    18             (LAND ALLOCATION - $1,000)
    19             (DESIGN AND CONTINGENCIES - $45,000)
    20         (3)  OLD US 30 TO ADAMS COUNTY LINE,
    21             PAVEMENT RESTORATION                          520,000
    22             (BASE PROJECT ALLOCATION - $480,000)
    23             (LAND ALLOCATION - $20,000)
    24             (DESIGN AND CONTINGENCIES - $20,000)
    25     (C)  PA 16                                                     <--
    26         (1)  INTERSECTION WITH ANTRIM CHURCH ROAD,
    27             ROADWAY AND INTERSECTION IMPROVEMENTS         250,000
    28             (BASE PROJECT ALLOCATION - $200,000)
    29             (LAND ALLOCATION - $25,000)
    30             (DESIGN AND CONTINGENCIES - $25,000)
    19970S0185B2061                 - 70 -

     1  Section 329.  Fulton County.
     2     (a)  I-70
     3         (1)  Warfordsburg to Deneen Gap,
     4             Rehabilitation and Safety Improvements        637,000
     5             (Base Project Allocation - $607,000)
     6             (Design and Contingencies - $30,000)
     7         (2)  CRYSTAL SPRING TO AMARANTH, PAVEMENT                  <--
     8             RESTORATION                                 1,700,000
     9             (BASE PROJECT ALLOCATION - $1,600,000)
    10             (DESIGN AND CONTINGENCIES - $100,000)
    11         (3)  TOWN HILL TO CRYSTAL SPRING,
    12             RESTORATION                                 4,400,000
    13             (BASE PROJECT ALLOCATION - $4,000,000)
    14             (DESIGN AND CONTINGENCIES - $400,000)
    15     (b)  SR 1001
    16         (1)  Reconstruction of Intersection of SR
    17             0016 and SR 1001 and Cito Road between
    18             Intersection and a Point One Mile South
    19             of Intersection                             2,000,000
    20             (Base Project Allocation - $1,600,000)
    21             (Land Allocation - $100,000)
    22             (Design and Contingencies - $300,000)
    23         (2)  CITO ROAD TO US 522, CONSTRUCT TWO-                   <--
    24             LANE ACCESS ROAD                              200,000
    25             (BASE PROJECT ALLOCATION - $185,000)
    26             (LAND ALLOCATION - $10,000)
    27             (DESIGN AND CONTINGENCIES - $5,000)
    28  Section 330.  Greene County.
    29     (a)  I-79
    30         (1)  1 Mile North of Kirby to 3 Miles South
    19970S0185B2061                 - 71 -

     1             of Waynesburg, Whiteley Township,
     2             Resurfacing                                   360,000
     3             (Base Project Allocation - $340,000)
     4             (Design and Contingencies - $20,000)
     5     (b)  I-79                                                      <--
     6         (1) (2)  3 Miles South of Waynesburg to                    <--
     7             Waynesburg, Franklin Township,
     8             Resurfacing                                   500,000
     9             (Base Project Allocation - $440,000)
    10             (Design and Contingencies - $60,000)
    11  Section 331.  Huntingdon County.
    12     (a)  SR 26
    13         (1)  Huntingdon Borough and Oneida, Miller,
    14             Jackson and Barree Townships, Isolated
    15             Improvements along 22 Miles of SR 26,
    16             Including Reconstruction and Widening
    17             of Pavement, Realignment, Intersection
    18             Improvements and Truck Climbing Lanes,
    19             to Upgrade Highway to Current
    20             Standards                                  25,500,000
    21             (Base Project Allocation - $20,500,000)
    22             (Land Allocation - $2,000,000)
    23             (Design and Contingencies - $3,000,000)
    24         (2)  Reconstruction and Corridor
    25             Improvements from Huntingdon Borough to
    26             Centre County Line                         25,000,000
    27             (Base Project Allocation - $20,500,000)
    28             (Land Allocation - $2,000,000)
    29             (Design and Contingencies - $2,500,000)
    30         (3)  HUNTINGDON TO CENTRE COUNTY LINE,                     <--
    19970S0185B2061                 - 72 -

     1             HIGHWAY RECONSTRUCTION AND
     2             IMPROVEMENTS                                  250,000
     3             (BASE PROJECT ALLOCATION - $200,000)
     4             (LAND ALLOCATION - $25,000)
     5             (DESIGN AND CONTINGENCIES - $25,000)
     6     (b)  SR 944
     7         (1)  Engineering and Land Acquisition from
     8             Intersection of SR 944 to Village of
     9             Cooks                                         600,000
    10             (Land Allocation - $100,000)
    11             (Design and Contingencies - $500,000)
    12     (C)  SR 3043 AND SR 3045                                       <--
    13         (1)  RAYSTOWN RECREATION AREA ACCESS,
    14             IMPROVEMENTS, WIDEN, RESURFACE AND
    15             SAFETY IMPROVEMENTS                           832,000
    16             (BASE PROJECT ALLOCATION - $750,000)
    17             (LAND ALLOCATION - $12,000)
    18             (DESIGN AND CONTINGENCIES - $70,000)
    19     (D)  PA 453
    20         (1)  WATER STREET TO TYRONE, ROADWAY
    21             IMPROVEMENTS                                  250,000
    22             (BASE PROJECT ALLOCATION - $200,000)
    23             (LAND ALLOCATION - $25,000)
    24             (DESIGN AND CONTINGENCIES - $25,000)
    25  Section 332.  Indiana County (Reserved).                          <--
    26  SECTION 332.  INDIANA COUNTY.                                     <--
    27     (A)  PA 56
    28         (1)  US 22 TO WESTMORELAND COUNTY LINE,
    29             REALIGNMENT AND RECONSTRUCTION              6,000,000
    30             (BASE PROJECT ALLOCATION - $4,400,000)
    19970S0185B2061                 - 73 -

     1             (LAND ALLOCATION - $600,000)
     2             (DESIGN AND CONTINGENCIES - $1,000,000)
     3     (B)  PA 403
     4         (1)  US 22 TO CAMBRIA COUNTY LINE,
     5             REALIGNMENT AND RECONSTRUCTION              4,000,000
     6             (BASE PROJECT ALLOCATION - $3,000,000)
     7             (LAND ALLOCATION - $400,000)
     8             (DESIGN AND CONTINGENCIES - $600,000)
     9         (2)  TR 553 TO CLYMER, PAVEMENT
    10             REHABILITATION AND SAFETY IMPROVEMENTS        420,000
    11             (BASE PROJECT ALLOCATION - $400,000)
    12             (DESIGN AND CONTINGENCIES - $20,000)
    13         (3)  INTERSECTION WITH PA 711, CRAMER
    14             BOROUGH, INTERSECTION RECONSTRUCTION
    15             AND SAFETY IMPROVEMENTS                     2,000,000
    16             (BASE PROJECT ALLOCATION - $1,500,000)
    17             (LAND ALLOCATION - $200,000)
    18             (DESIGN AND CONTINGENCIES - $300,000)
    19     (C)  US 422
    20         (1)  ARMSTRONG COUNTY LINE TO CAMBRIA
    21             COUNTY LINE, PAVEMENT REHABILITATION
    22             AND SAFETY IMPROVEMENTS                       220,000
    23             (BASE PROJECT ALLOCATION - $200,000)
    24             (DESIGN AND CONTINGENCIES - $20,000)
    25     (D)  US 422 AND US 119
    26         (1)  INDIANA BYPASS NORTH PM, RESURFACE,
    27             PAVEMENT REHABILITATION AND SAFETY
    28             IMPROVEMENTS                                  690,000
    29             (BASE PROJECT ALLOCATION - $660,000)
    30             (DESIGN AND CONTINGENCIES - $30,000)
    19970S0185B2061                 - 74 -

     1         (2)  INDIANA BYPASS SOUTH PM, RESURFACE,
     2             PAVEMENT REHABILITATION AND SAFETY
     3             IMPROVEMENTS                                1,030,000
     4             (BASE PROJECT ALLOCATION - $1,000,000)
     5             (DESIGN AND CONTINGENCIES - $30,000)
     6  Section 333.  Jefferson County.
     7     (a)  I-80
     8         (1)  Milepost 91 to Clearfield County Line,
     9             Pavement Rehabilitation and Safety
    10             Improvements                                  500,000
    11             (Base Project Allocation - $447,000)
    12             (Land Allocation - $3,000)
    13             (Design and Contingencies - $50,000)
    14         (2)  Exit 15, Railroad Overpass to
    15             Westbound Roadside Rest, Interstate
    16             Preventative Maintenance                    3,580,000
    17             (Base Project Allocation - $3,500,000)
    18             (Design and Contingencies - $80,000)
    19         (3)  CORSICA EAST FROM US 322 TO PA 28,                    <--
    20             PAVEMENT RESTORATION                        2,600,000
    21             (BASE PROJECT ALLOCATION - $2,500,000)
    22             (DESIGN AND CONTINGENCIES - $100,000)
    23         (4)  RESTORATION OF 4.8 MILES NEAR EXIT 15,
    24             PAVEMENT RESTORATION                        4,600,000
    25             (BASE PROJECT ALLOCATION - $4,500,000)
    26             (DESIGN AND CONTINGENCIES - $100,000)
    27  Section 334.  Juniata County (Reserved).                          <--
    28  SECTION 334.  JUNIATA COUNTY.                                     <--
    29     (A)  US 322/22
    30         (1)  NARROWS TO PERRY COUNTY LINE, PAVEMENT
    19970S0185B2061                 - 75 -

     1             RESTORATION                                 9,600,000
     2             (BASE PROJECT ALLOCATION - $9,500,000)
     3             (DESIGN AND CONTINGENCIES - $100,000)
     4  Section 335.  Lackawanna County.
     5     (a)  I-81
     6         (1)  Various routes in Lackawanna and
     7             Luzerne Counties, in the Vicinity of
     8             Scranton and Wilkes-Barre, Intelligent
     9             Transportation Systems Study                   80,000
    10             (Design and Contingencies - $80,000)
    11         (2)  Luzerne County Line to Susquehanna
    12             County Line, Pavement Rehabilitation
    13             and Safety Improvements                     2,700,000
    14             (Base Project Allocation - $2,416,000)
    15             (Land Allocation - $14,000)
    16             (Design and Contingencies - $270,000)
    17         (3)  Reconstruction of I-81 and Davis
    18             Street Interchange to Increase Length
    19             of Entrance and Exit Ramps                  5,000,000
    20             (Base Project Allocation - $4,600,000)
    21             (Land Allocation - $300,000)
    22             (Design and Contingencies - $100,000)
    23         (4)  EXIT 56 TO EXIT 57, CONSTRUCT ACCESS                  <--
    24             IMPROVEMENTS                                  500,000
    25             (BASE PROJECT ALLOCATION - $400,000)
    26             (LAND ALLOCATION - $50,000)
    27             (DESIGN AND CONTINGENCIES - $50,000)
    28         (5)  DESIGN AND CONSTRUCTION OF NEW I-81                   <--
    29             INTERCHANGE BETWEEN EXITS 56 AND 57 IN
    30             SCRANTON                                      975,000
    19970S0185B2061                 - 76 -

     1         (6)  PROPERTY ACQUISITION RELATING TO THE
     2             LACKAWANNA VALLEY INDUSTRIAL HIGHWAY IN
     3             SWINICK DEVELOPMENT ADJACENT TO I-81,
     4             DUNMORE BOROUGH                             1,500,000
     5         (7)  NOISE BARRIERS ON NORTH SIDE OF I-81
     6             FROM RIVER STREET EXIT TO BROOK STREET
     7             IN THE VICINITY OF ST. MARY'S CEMETERY,
     8             CITY OF SCRANTON                            2,000,000
     9         (8)  CONSTRUCTION OF STORM WATER MANAGEMENT
    10             SYSTEM FROM RIVER STREET SOUTH TO
    11             STAFFORD MEADOWBROOK CREEK                  2,400,000
    12             (BASE PROJECT ALLOCATION - $2,000,000)
    13             (DESIGN AND CONTINGENCIES - $400,000)
    14     (b)  I-84
    15         (1)  I-81 to Wayne County Line, Pavement
    16             Rehabilitation and Safety Improvements      1,200,000
    17             (Base Project Allocation - $1,074,000)
    18             (Land Allocation - $6,000)
    19             (Design and Contingencies - $120,000)
    20     (c)  I-380
    21         (1)  I-84 to Monroe County Line, Pavement
    22             Rehabilitation and Safety Improvements      1,000,000
    23             (Base Project Allocation - $895,000)
    24             (Land Allocation - $5,000)
    25             (Design and Contingencies - $100,000)
    26     (d)  US 6 and US 11
    27         (1)  Construction of Clarks Summit Bypass      25,000,000
    28             (Base Project Allocation - $24,000,000)
    29             (Design and Contingencies - 1,000,000)
    30         (2)  Construction of Turning Lanes in South
    19970S0185B2061                 - 77 -

     1             Abington Township                           1,100,000
     2             (Base Project Allocation - $1,000,000)
     3             (Design and Contingencies - $100,000)
     4         (3)  CONSTRUCTION OF FIFTH LANE IN SOUTH                   <--
     5             ABINGTON TOWNSHIP, SAFETY IMPROVEMENTS        199,000
     6             (BASE PROJECT ALLOCATION - $135,000)
     7             (LAND ALLOCATION - $10,000)
     8             (DESIGN AND CONTINGENCIES - $54,000)
     9         (4)  CONSTRUCTION OF STORM WATER MANAGEMENT
    10             SYSTEM, US 6 AND US 11 IN SOUTH
    11             ABINGTON TOWNSHIP                           2,500,000
    12         (5)  CONSTRUCTION OF STORM WATER MANAGEMENT
    13             SYSTEM, US 6 AND US 11 IN GLENBURN
    14             TOWNSHIP                                    1,500,000
    15     (e)  SR 632
    16         (1)  Reconstruction and Drainage
    17             Improvements, South Abington Township         350,000
    18             (Base Project Allocation - $300,000)
    19             (Design and Contingencies - $50,000)
    20     (f)  Shady Lane Road                                           <--
    21         (2)  CONSTRUCTION OF PARALLEL DRAINAGE                     <--
    22             SYSTEM IN ABINGTON TOWNSHIP AND
    23             WAVERLY                                       500,000
    24     (F)  SR 4032
    25         (1)  WIDEN SHADY LANE ROAD RAILROAD VIADUCT
    26             TO TWO LANES                                2,000,000
    27         (1) (2)  Widen Railroad Tunnel                  2,000,000  <--
    28             (Base Project Allocation - $1,800,000)
    29             (Design and Contingencies - $200,000)
    30     (g)  Keyser - Milwaukee Road                                   <--
    19970S0185B2061                 - 78 -

     1     (G)  SR 3011                                                   <--
     2         (1)  Reconstruction of Road from Main
     3             Street to Oak Street                          250,000
     4             (Base Project Allocation - $225,000)
     5             (Design and Contingencies - $25,000)
     6         (2)  RECONSTRUCTION, INCLUDING REPAVING,                   <--
     7             CURBING AND STORM WATER MANAGEMENT
     8             SYSTEM IN OLD FORGE BOROUGH                 2,200,000
     9         (3)  KEYSER AVENUE FROM TAYLOR-OLD FORGE                   <--
    10             LINE TO TAYLOR-SCRANTON LINE,
    11             CONSTRUCTION OF STORM WATER MANAGEMENT
    12             SYSTEM, BOROUGH OF TAYLOR                   2,400,000
    13             (BASE PROJECT ALLOCATION - $2,000,000)
    14             (DESIGN AND CONTINGENCIES - $400,000)
    15         (4)  KEYSER AVENUE FROM WEST MARKET STREET
    16             TO SCRANTON-TAYLOR LINE, SR 307 AND SR
    17             6307, CONSTRUCTION OF STORM WATER
    18             MANAGEMENT SYSTEM, CITY OF SCRANTON         2,400,000
    19             (BASE PROJECT ALLOCATION - $2,000,000)
    20             (DESIGN AND CONTINGENCIES - $400,000)
    21     (H)  SR 3019
    22         (1)  INSTALLATION OF CURBING AND STORM
    23             WATER MANAGEMENT SYSTEM IN OLD FORGE
    24             AND MOOSIC BOROUGHS                         2,000,000
    25     (I)  SR 307 AND SR 690
    26         (1)  INSTALLATION OF SIGNALS AT
    27             INTERSECTION OF SR 307 AND SR 690,
    28             SPRINGBROOK TOWNSHIP                          200,000
    29     (J)  PA 502
    30         (1)  PA 435 TO US 11, PAVEMENT
    19970S0185B2061                 - 79 -

     1             REHABILITATION AND SAFETY IMPROVEMENTS      1,242,000
     2             (BASE PROJECT ALLOCATION - $828,000)
     3             (DESIGN AND CONTINGENCIES - $414,000)
     4     (K)  US 11 AND SR 3002
     5         (1)  CENTRAL SCRANTON EXPRESSWAY, PAVEMENT
     6             REHABILITATION AND SAFETY IMPROVEMENTS      1,400,000
     7             (BASE PROJECT ALLOCATION - $1,200,000)
     8             (DESIGN AND CONTINGENCIES - $200,000)
     9     (L)  PA 247 AND SR 2008
    10         (1)  I-84 AND INDUSTRIAL HIGHWAY, WIDEN
    11             HIGHWAY                                     3,640,000
    12             (BASE PROJECT ALLOCATION - $2,920,000)
    13             (LAND ALLOCATION - $360,000)
    14             (DESIGN AND CONTINGENCIES - $360,000)
    15     (M)  SR 307                                                    <--
    16         (1)  MORGAN HIGHWAY FROM KEYSER AVENUE TO
    17             SCRANTON-SOUTH ABINGTON LINE,
    18             CONSTRUCTION OF STORM WATER MANAGEMENT
    19             SYSTEM, CITY OF SCRANTON                    1,200,000
    20             (BASE PROJECT ALLOCATION - $1,000,000)
    21             (DESIGN AND CONTINGENCIES - $200,000)
    22     (N)  SR 347
    23         (1)  CYPRESS STREET FROM THROOP-OLYPHANT
    24             LINE TO THROOP-DUNMORE LINE,
    25             CONSTRUCTION OF STORM WATER MANAGEMENT
    26             SYSTEM, BOROUGH OF THROOP                   1,200,000
    27             (BASE PROJECT ALLOCATION - $1,000,000)
    28             (DESIGN AND CONTINGENCIES - $200,000)
    29         (2)  DUNMORE STREET FROM THROOP-OLYPHANT
    30             LINE TO THROOP-DUNMORE LINE,
    19970S0185B2061                 - 80 -

     1             CONSTRUCTION OF STORM WATER MANAGEMENT
     2             SYSTEM, BOROUGH OF THROOP                   1,200,000
     3             (BASE PROJECT ALLOCATION - $1,000,000)
     4             (DESIGN AND CONTINGENCIES - $200,000)
     5     (O)  SR 2020
     6         (1)  BLAKELY STREET FROM DUNMORE-SCRANTON
     7             LINE TO DUNMORE-THROOP LINE,
     8             CONSTRUCTION OF STORM WATER MANAGEMENT
     9             SYSTEM, BOROUGH OF DUNMORE                  1,200,000
    10             (BASE PROJECT ALLOCATION - $1,000,000)
    11             (DESIGN AND CONTINGENCIES - $200,000)
    12         (2)  DRINKER STREET FROM DUNMORE-SCRANTON
    13             LINE TO I-380, CONSTRUCTION OF STORM
    14             WATER MANAGEMENT SYSTEM, BOROUGH OF
    15             DUNMORE                                     1,200,000
    16             (BASE PROJECT ALLOCATION - $1,000,000)
    17             (DESIGN AND CONTINGENCIES - $200,000)
    18     (P)  SR 3003
    19         (1)  JACKSON STREET FROM KEYSER AVENUE TO
    20             NEWTON ROAD, CONSTRUCTION OF STORM
    21             WATER MANAGEMENT SYSTEM, CITY OF
    22             SCRANTON                                      600,000
    23             (BASE PROJECT ALLOCATION - $500,000)
    24             (DESIGN AND CONTINGENCIES - $100,000)
    25         (2)  NEWTON ROAD FROM JACKSON STREET TO
    26             SCRANTON-NEWTON RAMSON LINE,
    27             CONSTRUCTION OF STORM WATER MANAGEMENT
    28             SYSTEM, CITY OF SCRANTON                    2,400,000
    29             (BASE PROJECT ALLOCATION - $2,000,000)
    30             (DESIGN AND CONTINGENCIES - $400,000)
    19970S0185B2061                 - 81 -

     1     (Q)  SR 3010
     2         (1)  UNION STREET FROM MAIN STREET TO
     3             KEYSER AVENUE, ROAD RECONSTRUCTION AND
     4             CONSTRUCTION OF STORM WATER MANAGEMENT
     5             SYSTEM, BOROUGH OF TAYLOR                   2,400,000
     6             (BASE PROJECT ALLOCATION - $2,000,000)
     7             (DESIGN AND CONTINGENCIES - $400,000)
     8     (R)  SR 3012
     9         (1)  OAK STREET FROM MAIN STREET TO KEYSER
    10             AVENUE, CONSTRUCTION OF STORM WATER
    11             MANAGEMENT SYSTEM, BOROUGH OF TAYLOR        1,200,000
    12             (BASE PROJECT ALLOCATION - $1,000,000)
    13             (DESIGN AND CONTINGENCIES - $200,000)
    14     (S)  SR 3013
    15         (1)  MAIN AVENUE, FROM SCRANTON-TAYLOR LINE
    16             TO SCRANTON-DICKSON CITY LINE,
    17             CONSTRUCTION OF STROM WATER MANAGEMENT
    18             SYSTEM, INCLUDING, BUT NOT LIMITED TO,
    19             RECONSTRUCTION, STORM SEWERS, CURBING
    20             AND SIDEWALKS, CITY OF SCRANTON             2,400,000
    21             (BASE PROJECT ALLOCATION - $2,000,000)
    22             (DESIGN AND CONTINGENCIES - $400,000)
    23     (T)  SR 3014
    24         (1)  LUZERNE STREET FROM MAIN AVENUE TO
    25             KEYSER AVENUE, CONSTRUCTION OF STORM
    26             WATER MANAGEMENT SYSTEM, CITY OF
    27             SCRANTON                                    1,200,000
    28             (BASE PROJECT ALLOCATION - $1,000,000)
    29             (DESIGN AND CONTINGENCIES - $200,000)
    30     (U)  SR 3029
    19970S0185B2061                 - 82 -

     1         (1)  PROVIDENCE ROAD, FROM OLIVE STREET TO
     2             MAIN AVENUE, CONSTRUCTION OF STORM
     3             WATER MANAGEMENT SYSTEM, CITY OF
     4             SCRANTON                                    2,200,000
     5             (BASE PROJECT ALLOCATION - $1,900,000)
     6             (DESIGN AND CONTINGENCIES - $300,000)
     7     (V)  SR 3033
     8         (1)  OAK STREET FROM KEYSER AVENUE TO NORTH
     9             SCRANTON EXPRESSWAY, CONSTRUCTION OF
    10             STORM WATER MANAGEMENT SYSTEM, CITY OF
    11             SCRANTON                                      720,000
    12             (BASE PROJECT ALLOCATION - $600,000)
    13             (DESIGN AND CONTINGENCIES - $120,000)
    14     (W)  SR 6011
    15         (1)  GREEN RIDGE STREET FROM BLAKELY STREET
    16             TO DUNMORE-SCRANTON LINE, CONSTRUCTION
    17             OF STORM WATER MANAGEMENT SYSTEM,
    18             BOROUGH OF DUNMORE                          1,200,000
    19             (BASE PROJECT ALLOCATION - $1,000,000)
    20             (DESIGN AND CONTINGENCIES - $200,000)
    21         (2)  GREEN RIDGE STREET FROM MAIN AVENUE TO
    22             SCRANTON-DUNMORE LINE, CONSTRUCTION OF
    23             STORM WATER MANAGEMENT SYSTEM, CITY OF
    24             SCRANTON                                    1,200,000
    25             (BASE PROJECT ALLOCATION - $1,000,000)
    26             (DESIGN AND CONTINGENCIES - $200,000)
    27         (3)  WEST MARKET STREET FROM KEYSER AVENUE
    28             TO MAIN AVENUE, CONSTRUCTION OF STORM
    29             WATER MANAGEMENT SYSTEM, CITY OF
    30             SCRANTON                                    1,200,000
    19970S0185B2061                 - 83 -

     1             (BASE PROJECT ALLOCATION - $1,000,000)
     2             (DESIGN AND CONTINGENCIES - $200,000)
     3     (X)  US 11
     4         (1)  NORTH SCRANTON EXPRESSWAY, PAVEMENT
     5             REHABILITATION AND SAFETY IMPROVEMENTS        320,000
     6             (BASE PROJECT ALLOCATION - $300,000)
     7             (DESIGN AND CONTINGENCIES - $20,000)
     8  Section 336.  Lancaster County.
     9     (a)  PA 23
    10         (1)  US 30 to Berks County Line, Pavement
    11             Rehabilitation and Safety Improvements      2,200,000
    12             (Base Project Allocation - $2,000,000)
    13             (Design and Contingencies - $200,000)
    14         (2)  Four Lane Relocation Environmental
    15             Impact Study                                1,000,000
    16             (Design and Contingencies - $1,000,000)
    17         (3)  US 30 to Berks County Line, Four Lane
    18             Relocation of PA 23                        60,000,000
    19         (4)  Environmental Impact Study                 1,000,000
    20         (5)  US 30 TO BERKS COUNTY LINE, M.I.S.,                   <--
    21             ROADWAY REHABILITATION AND SAFETY
    22             IMPROVEMENTS                                1,200,000
    23             (BASE PROJECT ALLOCATION - $1,000,000)
    24             (LAND ALLOCATION - $100,000)
    25             (DESIGN AND CONTINGENCIES - $100,000)
    26         (6)  US 30 TO BERKS COUNTY LINE, CORRIDOR
    27             IMPROVEMENTS                                1,200,000
    28             (BASE PROJECT ALLOCATION - $1,000,000)
    29             (LAND ALLOCATION - $100,000)
    30             (DESIGN AND CONTINGENCIES - $100,000)
    19970S0185B2061                 - 84 -

     1     (b)  PA 322
     2         (1)  Farmersville Road to PA 897, Pavement
     3             Rehabilitation, Widen Shoulder and
     4             Safety Improvements                         1,320,000
     5             (Base Project Allocation - $1,200,000)
     6             (Design and Contingencies - $120,000)
     7     (c)  PA 372
     8         (1)  Oak Bottom Road to Germantown Avenue,
     9             Pavement Rehabilitation and Safety
    10             Improvements                                2,200,000
    11             (Base Project Allocation - $2,000,000)
    12             (Design and Contingencies - $200,000)
    13     (d)  PA 896
    14         (1)  US 30 to Strasburg Borough, Pavement
    15             Rehabilitation, Widen Shoulder and
    16             Safety Improvements                         1,980,000
    17             (Base Project Allocation - $1,800,000)
    18             (Design and Contingencies - $180,000)
    19         (2)  Strasburg Borough to PA 372, Valley
    20             Road, Pavement Rehabilitation and
    21             Safety Improvements                         2,338,000
    22             (Base Project Allocation - $2,126,000)
    23             (Design and Contingencies - $212,000)
    24         (3)  STRASBURG TOWNSHIP AND STRASBURG                      <--
    25             BOROUGH, TWO-LANE RELOCATION                2,500,000
    26             (BASE PROJECT ALLOCATION - $2,500,000)
    27     (e)  PA 897
    28         (1)  Amish Road to Adamstown Road, Pavement
    29             Rehabilitation and Safety Improvements      3,850,000
    30             (Base Project Allocation - $3,500,000)
    19970S0185B2061                 - 85 -

     1             (Design and Contingencies - $350,000)
     2     (f)  US 30
     3         (1)  US 222 to PA 340                           3,000,000  <--
     4             (Design and Contingencies - $3,000,000)
     5         (2)  PA 741 to PA 72                            3,000,000
     6             (Design and Contingencies - $3,000,000)
     7         (1)  PA 741 TO PA 72, WIDENING WEST,                       <--
     8             ROADWAY REHABILITATION                      7,600,000
     9             (BASE PROJECT ALLOCATION - $6,800,000)
    10             (LAND ALLOCATION - $200,000)
    11             (DESIGN AND CONTINGENCIES - $600,000)
    12         (2)  US 222 TO PA 340, WIDENING EAST,
    13             ROADWAY REHABILITATION                      9,540,000
    14             (BASE PROJECT ALLOCATION - $8,740,000)
    15             (LAND ALLOCATION - $200,000)
    16             (DESIGN AND CONTINGENCIES - $600,000)
    17         (3)  PA 896 to PA 897                           3,000,000
    18             (Design and Contingencies - $3,000,000)
    19         (4)  PA 896 to PA 41, Environmental Impact
    20             Study                                       1,000,000
    21             (Design and Contingencies - $1,000,000)
    22         (5)  Widen to Five Lanes between PA 896 to
    23             PA 41                                      10,000,000
    24         (6)  Intersection Improvements on Parallel
    25             Roads to Alleviate Congestion Prior to
    26             and During Reconstruction                   1,000,000
    27         (7)  VICINITY OF PA 772 AND PA 41,                         <--
    28             RECONSTRUCTION                              1,500,000
    29             (BASE PROJECT ALLOCATION - $1,200,000)
    30             (LAND ALLOCATION - $150,000)
    19970S0185B2061                 - 86 -

     1             (DESIGN AND CONTINGENCIES - $150,000)
     2     (g)  SR 2015
     3         (1)  Strasburg Borough to PA 372, Pavement
     4             Rehabilitation and Safety Improvements      2,860,000
     5             (Base Project Allocation - $2,600,000)
     6             (Design and Contingencies - $260,000)
     7     (h)  SR 2040
     8         (1)  Paradise Lane to PA 741, Pavement
     9             Rehabilitation and Safety Improvements        671,000
    10             (Base Project Allocation - $610,000)
    11             (Design and Contingencies - $61,000)
    12     (i)  SR 3017
    13         (1)  PA 462 to Harrisburg Pike, Pavement
    14             Rehabilitation and Safety Improvements      7,700,000
    15             (Base Project Allocation - $7,000,000)
    16             (Design and Contingencies - $700,000)
    17     (j)  PA 41
    18         (1)  PA 926 to US 30, Major Investment
    19             Study                                         500,000
    20             (Design and Contingencies - $500,000)
    21     (k)  PA 72/PA 501 Corridor
    22         (1)  Construction of Manheim Relief Route       3,400,000
    23         (2)  Construction of East Petersburg Relief
    24             Route                                       2,400,000
    25         (3)  Widen PA 72 from PA 283 to Miller
    26             Road                                        4,000,000
    27     (l)  Airport Road
    28         (1)  Relocate and Realign Airport Road in
    29             Manheim Township                              300,000
    30  Section 337.  Lawrence County (Reserved).
    19970S0185B2061                 - 87 -

     1  Section 338.  Lebanon County.
     2     (a)  I-81
     3         (1)  I-78 to Schuylkill County Line,
     4             Pavement Rehabilitation and Safety
     5             Improvements                                1,500,000
     6             (Base Project Allocation - $1,342,000)
     7             (Land Allocation - $8,000)
     8             (Design and Contingencies - $150,000)
     9         (2)  DAUPHIN COUNTY LINE TO SCHUYLKILL                     <--
    10             COUNTY LINE, PAVEMENT REHABILITATION
    11             AND SAFETY IMPROVEMENTS                     1,501,000
    12             (BASE PROJECT ALLOCATION - $1,343,000)
    13             (LAND ALLOCATION - $8,000)
    14             (DESIGN AND CONTINGENCIES - $150,000)
    15     (b)  US 322
    16         (1)  PA 934/241 to PA 419, Intersection
    17             Improvements                                  456,000
    18             (Base Project Allocation - $410,000)
    19             (Land Allocation - $28,000)
    20             (Design and Contingencies - $18,000)
    21     (c)  SR 0897
    22         (1)  From SR 0501 West and Southwest beyond
    23             intersection with SR 0419, Heidelberg
    24             Township, reconstruct roadway              12,000,000
    25             (Base Construction Allocation -
    26             $12,000,000)
    27     (d)  I-78
    28         (1)  Construction of complete interchange
    29             at intersection of I-78 and SR 343 in
    30             Bethel Township                            12,000,000
    19970S0185B2061                 - 88 -

     1             (Base Construction Allocation -
     2             $8,000,000)
     3             (Land Allocation - $2,000,000)
     4             (Design and Contingencies - $2,000,000)
     5     (e)  SR 501
     6         (1)  Construction of bypass of SR 501 on
     7             the west side of Schafferstown from
     8             Main Street to vicinity of Michter's
     9             Road, Heidelberg Township                   8,000,000
    10             (Base Construction Allocation -
    11             $6,000,000)
    12             (Land Allocation - $1,000,000)
    13             (Design and Contingencies - $1,000,000)
    14     (F)  PA 72                                                     <--
    15         (1)  JONESTOWN ROAD TO I-78, PAVEMENT
    16             REHABILITATION AND SAFETY IMPROVEMENTS        460,000
    17             (BASE PROJECT ALLOCATION - $300,000)
    18             (LAND ALLOCATION - $10,000)
    19             (DESIGN AND CONTINGENCIES - $150,000)
    20     (G)  US 22
    21         (1)  PA 343 TO US 22, PAVEMENT RESTORATION      1,100,000
    22             (BASE PROJECT ALLOCATION - $1,000,000)
    23             (DESIGN AND CONTINGENCIES - $100,000)
    24         (2)  PA 343 TO SR 1011, PAVEMENT
    25             REHABILITATION AND SAFETY IMPROVEMENTS        510,000
    26             (BASE PROJECT ALLOCATION - $200,000)
    27             (LAND ALLOCATION - $10,000)
    28             (DESIGN AND CONTINGENCIES - $300,000)
    29     (H)  PA 422/PA 934 INTERSECTION
    30         (1)  IMPROVEMENT OF INTERSECTION IN
    19970S0185B2061                 - 89 -

     1             ANNVILLE TOWNSHIP                           1,200,000
     2             (BASE CONSTRUCTION ALLOCATION -
     3             $900,000)
     4             (LAND ALLOCATION - $150,000)
     5             (DESIGN AND CONTINGENCIES - $150,000)
     6  Section 339.  Lehigh County.
     7     (a)  SR 1017 and SR 1008
     8         (1)  Reconstruct and Improve Mauch Chunk
     9             Road, Schadt Avenue and Rural Road in
    10             Whitehall Township                          1,073,000
    11             (Base Project Allocation - $774,000)
    12             (Land Allocation - $120,000)
    13             (Design and Contingencies - $179,000)
    14     (b)  SR 3017
    15         (1)  Widening to four lanes from Industrial
    16             Drive to City Line Road, Hanover
    17             Township                                    2,462,000
    18             (Base Project Allocation - $1,610,000)
    19             (Land Allocation - $572,000)
    20             (Design and Contingencies - $280,000)
    21         (2)  Widening to four lanes from City Line
    22             Road to Race Street Extension, Hanover
    23             Township                                    2,720,000
    24             (Base Project Allocation - $2,036,000)
    25             (Land Allocation - $404,000)
    26             (Design and Contingencies - $280,000)
    27     (c)  SR 1004
    28         (1)  Extend four lanes from SR 0987 to SR
    29             3017, Catasauqua Borough                    2,892,000
    30             (Base Project Allocation - $926,000)
    19970S0185B2061                 - 90 -

     1             (Land Allocation - $1,560,000)
     2             (Design and Contingencies - $406,000)
     3         (2)  Widen to four lanes from SR 0987 to
     4             Willowbrook Road, Hanover Township          2,770,000
     5             (Base Project Allocation - $1,540,000)
     6             (Land Allocation - $948,000)
     7             (Design and Contingencies - $282,000)
     8     (d)  SR 0987
     9         (1)  Widen to four lanes from Avenue A to
    10             SR 3017, Catasauqua Borough                 3,660,000
    11             (Base Project Allocation - $2,842,000)
    12             (Land Allocation - $418,000)
    13             (Design and Contingencies - $400,000)
    14         (2)  Widening of Schoenersville and Airport
    15             Roads, Extension of Race Street,
    16             Realignment of Airport Road/Race Street
    17             Intersection in Hanover Township            4,066,000
    18             (Base Project Allocation - $3,466,000)
    19             (Land Allocation - $600,000)
    20     (E)  SR 2044                                                   <--
    21         (1)  SAUCON VALLEY ROAD 2, FOUR-LANE
    22             RELOCATION                                  4,600,000
    23             (BASE PROJECT ALLOCATION - $3,215,000)
    24             (LAND ALLOCATION - $600,000)
    25             (DESIGN AND CONTINGENCIES - $785,000)
    26     (F)  US 22
    27         (1)  MILL AND RESURFACE 1.4 MILES, LEHIGH
    28             COUNTY                                        800,000
    29             (BASE PROJECT ALLOCATION - $700,000)
    30             (DESIGN AND CONTINGENCIES - $100,000)
    19970S0185B2061                 - 91 -

     1         (2)  CORRIDOR I-78 TO PA 33, TRANSPORTATION
     2             STUDY                                         300,000
     3             (BASE PROJECT ALLOCATION - $300,000)
     4     (G)  PA 309
     5         (1)  SAFETY AND CAPACITY IMPROVEMENTS
     6             INCLUDING OLD PACKHOUSE ROAD                2,050,000
     7             (BASE PROJECT ALLOCATION - $1,640,000)
     8             (LAND ALLOCATION - $205,000)
     9             (DESIGN AND CONTINGENCIES - $205,000)
    10     (H)  AMERICAN PARKWAY
    11         (1)  CONSTRUCT AMERICAN PARKWAY BRIDGE,
    12             ALLENTOWN                                   8,000,000
    13             (BASE PROJECT ALLOCATION - $6,400,000)
    14             (LAND ALLOCATION - $800,000)
    15             (DESIGN AND CONTINGENCIES - $800,000)
    16  Section 340.  Luzerne County.
    17     (a)  I-80
    18         (1)  White Haven to Carbon County Line,
    19             Pavement Rehabilitation and Safety
    20             Improvements                                  101,000  <--
    21             (Base Project Allocation - $90,000)
    22             (Land Allocation - $1,000)
    23             (Design and Contingencies - $10,000)
    24             IMPROVEMENTS                                  191,000  <--
    25             (BASE PROJECT ALLOCATION - $90,000)
    26             (LAND ALLOCATION - $1,000)
    27             (DESIGN AND CONTINGENCIES - $100,000)
    28     (b)  I-81
    29         (1)  Schuylkill County Line to I-80,
    30             Pavement Rehabilitation and Safety
    19970S0185B2061                 - 92 -

     1             Improvements                                1,200,000
     2             (Base Project Allocation - $1,074,000)
     3             (Land Allocation - $6,000)
     4             (Design and Contingencies - $120,000)
     5         (2)  PA 29 to Lackawanna County Line,
     6             Pavement Rehabilitation and Safety
     7             Improvements                                1,400,000
     8             (Base Project Allocation - $1,253,000)
     9             (Land Allocation - $7,000)
    10             (Design and Contingencies - $140,000)
    11     (c)  SR 2007
    12         (1)  Reconstruction of Northampton Street
    13             and SR 6309 at the Interchange of SR
    14             2007 and SR 6309                              900,000
    15             (Base Project Allocation - $750,000)
    16             (Land Allocation - $50,000)
    17             (Design and Contingencies - $100,000)
    18     (D)  PA 309                                                    <--
    19         (1)  I-80 TO MOUNTAINTOP AT PA 347,
    20             PAVEMENT REHABILITATION AND SAFETY
    21             IMPROVEMENTS                                1,040,000
    22             (BASE PROJECT ALLOCATION - $693,000)
    23             (DESIGN AND CONTINGENCIES - $347,000)
    24         (2)  UPPER DEMUNDS, DALLAS BOROUGH AND
    25             DALLAS TOWNSHIP, SAFETY IMPROVEMENTS
    26             AND SIGNALS                                    99,000
    27             (BASE PROJECT ALLOCATION - $77,000)
    28             (LAND ALLOCATION - $2,000)
    29             (DESIGN AND CONTINGENCIES - $20,000)
    30         (3)  CITY OF WILKES-BARRE, DALLAS BOROUGH
    19970S0185B2061                 - 93 -

     1             AND KINGSTON TOWNSHIP, SAFETY
     2             IMPROVEMENTS AND SIGNALS                      154,000
     3             (BASE PROJECT ALLOCATION - $90,000)
     4             (LAND ALLOCATION - $10,000)
     5             (DESIGN AND CONTINGENCIES - $54,000)
     6     (E)  PA 924
     7         (1)  OAK RIDGE ROAD, RECONSTRUCT
     8             INTERSECTION AND ACCESS IMPROVEMENTS          650,000
     9             (BASE PROJECT ALLOCATION - $550,000)
    10             (LAND ALLOCATION - $50,000)
    11             (DESIGN AND CONTINGENCIES - $50,000)
    12     (F)  CENTER STREET
    13         (1)  CONSTRUCT ACCESS ROAD AND ASSOCIATED
    14             IMPROVEMENTS BETWEEN CENTER STREET AND
    15             PROSPECT STREET                             8,000,000
    16             (BASE PROJECT ALLOCATION - $7,300,000)
    17             (LAND ALLOCATION - $340,000)
    18             (DESIGN AND CONTINGENCIES - $360,000)
    19     (G)  PA 93                                                     <--
    20         (1)  BROAD STREET IN HAZELTON, WIDENING,
    21             REHABILITATION AND INTERSECTION
    22             IMPROVEMENTS                                  500,000
    23             (BASE PROJECT ALLOCATION - $400,000)
    24             (LAND ALLOCATION - $50,000)
    25             (DESIGN AND CONTINGENCIES - $50,000)
    26     (H)  SR 29
    27         (1)  CONSTRUCTION OF ACCESS ROAD FROM SR 29
    28             TO LUZERNE COUNTY COMMUNITY COLLEGE         4,000,000
    29  Section 341.  Lycoming County.
    30     (a)  SR 220
    19970S0185B2061                 - 94 -

     1         (1)  Shrewsbury Township, SR 220 North of
     2             Tivoli to T-650, Raise Grade to Reduce
     3             Flooding                                      750,000
     4             (Base Project Allocation - $600,000)
     5             (Land Allocation - $50,000)
     6             (Design and Contingencies - $100,000)
     7         (2)  Shrewsbury Township, SR 220 South of
     8             Glen Mawr to SR 2083, 0.7 Mile
     9             Reconstruction, Improve Horizontal and
    10             Vertical Alignment                          1,250,000
    11             (Base Project Allocation - $1,000,000)
    12             (Land Allocation - $50,000)
    13             (Design and Contingencies - $200,000)
    14         (3)  Shrewsbury Township, SR 220 North of
    15             Glen Mawr to Former LR 41035 Turnback
    16             Route, 0.3 Mile Reconstruction                720,000
    17             (Base Project Allocation - $600,000)
    18             (Land Allocation - $20,000)
    19             (Design and Contingencies - $100,000)
    20         (4)  Spot improvements in Shrewsbury and
    21             Penn Townships, Lycoming County and
    22             Davidson Township, Sullivan County          9,250,000
    23             (Base Project Allocation - $8,000,000)
    24             (Land Allocation - $250,000)
    25             (Design and Contingencies - $1,000,000)
    26         (5)  CLINTON COUNTY LINE TO WILLIAMSPORT,                  <--
    27             PAVEMENT REHABILITATION AND SAFETY
    28             IMPROVEMENTS                                  400,000
    29             (BASE PROJECT ALLOCATION - $400,000)
    30         (6)  WOODWARD TOWNSHIP TO LYCOMING CREEK,
    19970S0185B2061                 - 95 -

     1             RESTORATION                                 1,700,000
     2             (BASE PROJECT ALLOCATION - $1,550,000)
     3             (DESIGN AND CONTINGENCIES - $150,000)
     4     (b)  SR 405
     5         (1)  Muncy Creek Township, SR 405, East of
     6             Muncy between I-180 and PA 405/PA 442
     7             Intersection, 0.5 Mile Reconstruction,
     8             Raise Grade to Reduce Flooding                950,000
     9             (Base Project Allocation - $800,000)
    10             (Land Allocation - $50,000)
    11             (Design and Contingencies - $100,000)
    12         (2)  I-180 to PA 405, Muncy Creek Township,
    13             reconstruction to reduce recurrent
    14             flooding                                      950,000
    15             (Base Project Allocation - $800,000)
    16             (Land Allocation - $50,000)
    17             (Design and Contingencies - $100,000)
    18     (c)  I-180
    19         (1)  Williamsport Beltway, Pavement
    20             Rehabilitation                                550,000
    21             (Base Project Allocation - $500,000)
    22             (Design and Contingencies - $50,000)
    23         (2)  Construction of Lycoming Mall
    24             Interchange and Related Road Network
    25             Improvements                               13,400,000
    26             (Base Project Allocation - $8,600,000)
    27             (Land Allocation - $3,600,000)
    28             (Design and Contingencies - $1,200,000)
    29         (3)  FAXON TO US 15, RESTORATION                  440,000  <--
    30             (BASE PROJECT ALLOCATION - $400,000)
    19970S0185B2061                 - 96 -

     1             (DESIGN AND CONTINGENCIES - $40,000)
     2         (4)  LOYALSOCK CREEK BRIDGE TO US 220,
     3             RESTORATION                                 2,000,000
     4             (BASE PROJECT ALLOCATION - $1,800,000)
     5             (DESIGN AND CONTINGENCIES - $200,000)
     6         (5)  MUNCY TO PA 54, RESTORATION                  198,000
     7             (BASE PROJECT ALLOCATION - $180,000)
     8             (DESIGN AND CONTINGENCIES - $18,000)
     9         (6)  WESTBOUND LANES FROM FAXON TO US 15
    10             NORTH, PAVEMENT RESTORATION AND
    11             INTERCHANGE IMPROVEMENTS                    4,500,000
    12             (BASE PROJECT ALLOCATION - $4,400,000)
    13             (DESIGN AND CONTINGENCIES - $100,000)
    14         (7)  INTERSECTION WITH SR 2049, INTERCHANGE
    15             IMPROVEMENTS                                3,000,000
    16             (BASE PROJECT ALLOCATION - $2,400,000)
    17             (LAND ALLOCATION - $300,000)
    18             (DESIGN AND CONTINGENCIES - $300,000)
    19         (8)  CONSTRUCT ACCESS ROAD TO WILLIAMSPORT-
    20             LYCOMING COUNTY AIRPORT                     1,800,000
    21             (BASE PROJECT ALLOCATION - $1,440,000)
    22             (LAND ALLOCATION - $180,000)
    23             (DESIGN AND CONTINGENCIES - $180,000)
    24         (9)  DESIGN AND CONSTRUCTION OF I-80 RAMP                  <--
    25             SYSTEM AND LOCAL ROAD IMPROVEMENTS IN
    26             MUNCY TOWNSHIP                              5,325,000
    27     (d)  Williamsport Regional Airport Access Road
    28         (1)  Construction of a New Two Lane Access
    29             Road from the Wannersville Road
    30             Interchange of I-180 to the
    19970S0185B2061                 - 97 -

     1             Williamsport Regional Airport              15,000,000
     2             (Base Project Allocation - $12,500,000)
     3             (Land Allocation - $250,000)
     4             (Design and Contingencies - $2,000,000)
     5     (E)  SR 405                                                    <--
     6         (1)  WATSONTOWN TO LYCOMING COUNTY LINE,
     7             PAVEMENT RESTORATION                          360,000
     8             (BASE PROJECT ALLOCATION - $320,000)
     9             (LAND ALLOCATION - $20,000)
    10             (DESIGN AND CONTINGENCIES - $20,000)
    11     (F)  US 15
    12         (1)  NORTHBOUND LANES FROM TROUT RUN TO
    13             STEAM VALLEY, PAVEMENT RESTORATION          3,300,000
    14             (BASE PROJECT ALLOCATION - $3,200,000)
    15             (DESIGN AND CONTINGENCIES - $100,000)
    16  Section 342.  McKean County (Reserved).                           <--
    17  SECTION 342.  MCKEAN COUNTY.                                      <--
    18     (A)  US 219
    19         (1)  BRADFORD BYPASS EXTENSION NEAR OWENS
    20             WAY, NEW FOUR-LANE ROADWAY                  1,377,000
    21             (BASE PROJECT ALLOCATION - $1,118,000)
    22             (LAND ALLOCATION - $80,000)
    23             (DESIGN AND CONTINGENCIES - $179,000)
    24     (B)  US 6
    25         (1)  SMETHPORT TO MT. JEWETT, PAVEMENT
    26             REHABILITATION AND SAFETY IMPROVEMENTS        420,000
    27             (BASE PROJECT ALLOCATION - $400,000)
    28             (DESIGN AND CONTINGENCIES - $20,000)
    29  Section 343.  Mercer County.
    30     (a)  I-79
    19970S0185B2061                 - 98 -

     1         (1)  Lawrence County Line to Crawford
     2             County Line, Pavement Rehabilitation
     3             and Safety Improvements                     2,600,000
     4             (Base Project Allocation - $2,327,000)
     5             (Land Allocation - $13,000)
     6             (Design and Contingencies - $260,000)
     7         (2)  INTERSECTION WITH PA 208 AND PA 258,                  <--
     8             SPRINGFIELD TOWNSHIP, HIGHWAY AND
     9             INTERCHANGE IMPROVEMENTS                    2,700,000
    10             (BASE PROJECT ALLOCATION - $2,500,000)
    11             (LAND ALLOCATION - $100,000)
    12             (DESIGN AND CONTINGENCIES - $100,000)
    13     (b)  I-80
    14         (1)  PA 173 to Venango County Line, Safety
    15             Improvements and Pavement
    16             Rehabilitation, Length 4.0 Miles           12,600,000
    17             (Base Project Allocation - $12,000,000)
    18             (Design and Contingencies - $600,000)
    19         (2)  OHIO STATE LINE TO US 19, PAVEMENT                    <--
    20             REHABILITATION AND SAFETY IMPROVEMENTS      1,020,000
    21             (BASE PROJECT ALLOCATION - $1,000,000)
    22             (LAND ALLOCATION - $10,000)
    23             (DESIGN AND CONTINGENCIES - $10,000)
    24     (c)  PA 208
    25         (1)  From PA 258 to Old Route 258,
    26             Including Bridge over I-79, Widen to 48
    27             Feet                                       14,700,000
    28             (Base Construction Allocation -
    29             $12,500,000)
    30             (Land Allocation - $1,000,000)
    19970S0185B2061                 - 99 -

     1             (Design and Contingencies - $1,200,000)
     2     (d)  SR 60
     3         (1)  Bridge Rehabilitation and Interchange
     4             Improvement at SR 318                       4,080,000
     5             (Base Project Allocation - $3,800,000)
     6             (Land Allocation - $80,000)
     7             (Design and Contingencies - $200,000)
     8         (2)  T-369 TO BROADWAY, PAVEMENT                           <--
     9             REHABILITATION AND SAFETY IMPROVEMENTS        620,000
    10             (BASE PROJECT ALLOCATION - $600,000)
    11             (DESIGN AND CONTINGENCIES - $20,000)
    12     (E)  PA 58
    13         (1)  NEAR JAMESTOWN, UNDERPASS REMOVAL AND
    14             PAVEMENT REHABILITATION                       250,000
    15             (BASE PROJECT ALLOCATION - $200,000)
    16             (LAND ALLOCATION - $20,000)
    17             (DESIGN AND CONTINGENCIES - $20,000)
    18     (F)  PA 518
    19         (1)  HERMITAGE TOWNSHIP LAMORE ROAD OVER                   <--
    20             PINE HOLLOW RUN, TWO-LANE RELOCATION          760,000
    21             (BASE PROJECT ALLOCATION - $600,000)
    22             (LAND ALLOCATION - $100,000)
    23             (DESIGN AND CONTINGENCIES - $60,000)
    24     (G)  TR 18                                                     <--
    25         (1)  REMOVE BOX BEAM BARRIER, ADD TURNING
    26             LANES, SHOULDER AND INTERSECTION
    27             IMPROVEMENTS                                5,750,000
    28             (BASE PROJECT ALLOCATION - $4,000,000)
    29             (LAND ALLOCATION - $1,250,000)
    30             (DESIGN AND CONTINGENCIES - $500,000)
    19970S0185B2061                 - 100 -

     1         (2)  HERMITAGE TO GREENVILLE, PAVEMENT
     2             REHABILITATION AND SAFETY IMPROVEMENTS        440,000
     3             (BASE PROJECT ALLOCATION - $400,000)
     4             (LAND ALLOCATION - $20,000)
     5             (DESIGN AND CONTINGENCIES - $20,000)
     6     (H)  PA 718
     7         (1)  IMPROVEMENTS TO ROUTE 718 IN THE
     8             BOROUGH OF WHEATLAND AND CITIES OF
     9             FARRELL AND SHARON                         10,000,000
    10  Section 344.  Mifflin County (Reserved).                          <--
    11  SECTION 344.  MIFFLIN COUNTY.                                     <--
    12     (A)  US 322
    13         (1)  US 22 AND US 322, NARROWS, LEWISTOWN
    14             BYPASS, FOUR-LANE RELOCATION               85,000,000
    15             (BASE PROJECT ALLOCATION - $80,000,000)
    16             (LAND ALLOCATION - $5,000,000)
    17         (2)  ELECTRIC AVENUE TO NARROWS, PAVEMENT
    18             RESTORATION                                 7,000,000
    19             (BASE PROJECT ALLOCATION - $6,750,000)
    20             (DESIGN AND CONTINGENCIES - $250,000)
    21  Section 345.  Monroe County.
    22     (a)  I-80
    23         (1)  Carbon County Line to PA 115, Pavement                <--
    24             Rehabilitation and Safety Improvements        100,000
    25             (Base Project Allocation - $89,000)
    26             (Land Allocation - $1,000)
    27             (Design and Contingencies - $10,000)
    28         (2) (1)  Construction of Full Interchange
    29             at I-80, Exit 44 to Connect with US
    30             611                                        13,000,000
    19970S0185B2061                 - 101 -

     1             (Base Construction Allocation -
     2             $10,000,000)
     3             (Land Allocation - $2,000,000)
     4             (Design and Contingencies - $1,000,000)
     5         (3) (2)  CARBON COUNTY LINE TO US 209,                     <--
     6             PAVEMENT REHABILITATION AND SAFETY
     7             IMPROVEMENTS                                2,190,000
     8             (BASE PROJECT ALLOCATION - $1,989,000)
     9             (LAND ALLOCATION - $1,000)
    10             (DESIGN AND CONTINGENCIES - $200,000)
    11         (4) (3)  INTERCHANGE WITH I-380,                           <--
    12             INTERCHANGE IMPROVEMENTS                    2,766,000
    13             (BASE PROJECT ALLOCATION - $2,666,000)
    14             (DESIGN AND CONTINGENCIES - $100,000)
    15         (5) (4)  I-80 AT TUNKHANNOCK, PAVEMENT                     <--
    16             RESTORATION                                 2,440,000
    17             (BASE PROJECT ALLOCATION - $2,400,000)
    18             (DESIGN AND CONTINGENCIES - $40,000)
    19         (5)  CONSTRUCTION OF DIAMOND-SHAPED                        <--
    20             INTERCHANGE AT EXIT 53 OF I-80 IN
    21             DELAWARE WATER GAP TO PROVIDE ACCESS TO
    22             VISITORS CENTER                            14,000,000
    23             (BASE PROJECT ALLOCATION - $13,000,000)
    24             (DESIGN AND CONTINGENCIES - $1,000,000)
    25     (b)  SR 115
    26         (1)  From I-80, at Exit 43, South
    27             Approximately 3.5 Miles to Long Pond
    28             Road, Stabilize and Widen Shoulders        11,000,000
    29             (Base Project Allocation - $10,500,000)
    30             (Design and Contingencies - $500,000)
    19970S0185B2061                 - 102 -

     1     (c)  SR 209
     2         (1)  Construction of 4-lane Divided
     3             Relocation of SR 209 at Intersection
     4             with SR 402 in Smithfield Township         49,500,000
     5             (Base Project Allocation - $35,000,000)
     6             (Land Allocation - $10,000,000)
     7             (Design and Contingencies - $4,500,000)
     8         (2)  Transportation Study for Possible
     9             Marshalls Creek Bypass                        300,000
    10             (Design and Contingencies - $300,000)
    11         (3)  CONSTRUCTION OF INTERSECTION                          <--
    12             IMPROVEMENTS OF ROUTES 209/447
    13             INTERSECTION JUST OFF EXIT 52 OF I-80
    14             IN SMITHFIELD TOWNSHIP                      3,800,000
    15             (BASE PROJECT ALLOCATION - $3,500,000)
    16             (DESIGN AND CONTINGENCIES - $300,000)
    17     (d)  SR 611
    18         (1)  Widen to 64 Feet Between T-535 and T-
    19             537 in Pocono Township                      2,600,000
    20             (Base Project Allocation - $2,000,000)
    21             (Land Allocation - $500,000)
    22             (Design and Contingencies - $100,000)
    23         (2)  Restoration of SR 611 between Scotrun
    24             and Swiftwater, Pocono Township             2,010,000
    25             (Base Construction Allocation -
    26             $2,000,000)
    27             (Design and Contingencies - $10,000)
    28         (3)  FIVE-POINT INTERSECTION WITH SR 940                   <--
    29             AND SR 196, INTERSECTION IMPROVEMENTS         540,000
    30             (BASE PROJECT ALLOCATION - $400,000)
    19970S0185B2061                 - 103 -

     1             (LAND ALLOCATION - $80,000)
     2             (DESIGN AND CONTINGENCIES - $60,000)
     3     (e)  Pocono Scenic Vistas
     4         (1)  Construction of Pocono Scenic Vistas
     5             in the Long Pond area                       1,250,000
     6             (Base Project Allocation - $100,000)
     7             (Land Allocation - $1,050,000)
     8             (Design and Contingencies - $100,000)
     9  Section 346.  Montgomery County.
    10     (a)  Souder Road
    11         (1)  Reconstruct Portion of Souder Road to
    12             Remove Curves in Franconia Township           540,000
    13             (Base Project Allocation - $400,000)
    14             (Land Allocation - $100,000)
    15             (Design and Contingencies - $40,000)
    16     (b)  SR 0029
    17         (1)  Collegeville Borough, SR 0029
    18             realignment between Main Street and 1st
    19             Avenue                                      1,900,000
    20             (Base Project Allocation - $750,000)
    21             (Land Allocation - $950,000)
    22             (Design and Contingencies - $200,000)
    23         (2)  MAIN STREET, 1ST AVENUE AND 2ND                       <--
    24             AVENUE, ROADWAY REALIGNMENT                 1,000,000
    25             (BASE PROJECT ALLOCATION - $640,000)
    26             (LAND ALLOCATION - $200,000)
    27             (DESIGN AND CONTINGENCIES - $160,000)
    28     (c)  PA 23
    29         (1)  River Road at Balligomingo, West
    30             Conshohocken Township, Roadway
    19970S0185B2061                 - 104 -

     1             Relocation and Resignalization                424,000
     2             (Base Project Allocation - $400,000)
     3             (Land Allocation - $24,000)
     4     (d)  PA 463
     5         (1)  US 611 to PA 152, Horsham Township,
     6             Intersection Improvements, Widening and
     7             Restoration                                   830,000
     8             (Base Project Allocation - $650,000)
     9             (Land Allocation - $55,000)
    10             (Design and Contingencies - $125,000)
    11     (E)  I-476                                                     <--
    12         (1)  I-76 TO CHEMICAL ROAD, PAVEMENT
    13             REHABILITATION AND SAFETY IMPROVEMENTS      2,900,000
    14             (BASE PROJECT ALLOCATION - $2,700,000)
    15             (DESIGN AND CONTINGENCIES - $200,000)
    16         (2)  CONSTRUCTION NEW INTERCHANGE BETWEEN
    17             NORRISTOWN AND QUAKERTOWN BOROUGHS         15,000,000
    18             (BASE PROJECT ALLOCATION - $12,000,000)
    19             (LAND ALLOCATION - $1,500,000)
    20             (DESIGN AND CONTINGENCIES - $1,500,000)
    21     (F)  PA 100
    22         (1)  CHESTER COUNTY LINE TO BERKS COUNTY
    23             LINE, PAVEMENT REHABILITATION AND
    24             SAFETY IMPROVEMENTS                         1,000,000
    25             (BASE PROJECT ALLOCATION - $800,000)
    26             (DESIGN AND CONTINGENCIES - $200,000)
    27     (G)  PA 113
    28         (1)  PERKIOMEN TO SKIPPACK, PAVEMENT
    29             REHABILITATION AND SAFETY IMPROVEMENTS      1,193,000
    30             (BASE PROJECT ALLOCATION - $340,000)
    19970S0185B2061                 - 105 -

     1             (LAND ALLOCATION - $750,000)
     2             (DESIGN AND CONTINGENCIES - $103,000)
     3     (H)  PA 63
     4         (1)  SUNNEYTOWN PIKE AND FORTY-FOOT ROAD,
     5             WIDEN AND SIGNALS                             165,000
     6             (BASE PROJECT ALLOCATION - $130,000)
     7             (LAND ALLOCATION - $15,000)
     8             (DESIGN AND CONTINGENCIES - $20,000)
     9     (I)  PA 73
    10         (1)  HASBROOK AVENUE TO PA 611, PAVEMENT
    11             REHABILITATION AND SAFETY IMPROVEMENTS        944,000
    12             (BASE PROJECT ALLOCATION - $800,000)
    13             (DESIGN AND CONTINGENCIES - $144,000)
    14         (2)  INTERSECTION WITH SWAMP PIKE, NEW
    15             HANOVER TOWNSHIP, INTERSECTION
    16             IMPROVEMENTS                                  825,000
    17             (BASE PROJECT ALLOCATION - $650,000)
    18             (LAND ALLOCATION - $75,000)
    19             (DESIGN AND CONTINGENCIES - $100,000)
    20     (J)  SR 4022
    21         (1)  LEWIS ROAD CURVE FROM RIDGE ROAD TO
    22             KNIGHTS ROAD, RECONSTRUCTION                  800,000
    23             (BASE PROJECT ALLOCATION - $600,000)
    24             (LAND ALLOCATION - $50,000)
    25             (DESIGN AND CONTINGENCIES - $150,000)
    26     (K)  US 202
    27         (1)  SWEDESFORD ROAD TO GULPH ROAD, OFF-
    28             SITE IMPROVEMENTS                           2,216,000
    29             (BASE PROJECT ALLOCATION - $400,000)
    30             (LAND ALLOCATION - $1,700,000)
    19970S0185B2061                 - 106 -

     1             (DESIGN AND CONTINGENCIES - $116,000)
     2         (2)  SOUTHBOUND FROM JOHNSON HIGHWAY TO
     3             MAIN STREET, RECONSTRUCTION                   720,000
     4             (BASE PROJECT ALLOCATION - $610,000)
     5             (LAND ALLOCATION - $20,000)
     6             (DESIGN AND CONTINGENCIES - $90,000)
     7         (3)  PA 63 TO SEPTA RAIL CROSSING, FOUR-
     8             LANE HIGHWAY IMPROVEMENTS                   3,200,000
     9             (BASE PROJECT ALLOCATION - $2,400,000)
    10             (LAND ALLOCATION - $500,000)
    11             (DESIGN AND CONTINGENCIES - $300,000)
    12         (4)  SB MARKLEY STREET FROM JOHNSON HIGHWAY
    13             TO MAIN STREET, RECONSTRUCTION              1,470,000
    14             (BASE PROJECT ALLOCATION - $1,200,000)
    15             (LAND ALLOCATION - $70,000)
    16             (DESIGN AND CONTINGENCIES - $200,000)
    17     (L)  US 422
    18         (1)  CHESTER COUNTY PARK RESTORATION,
    19             PAVEMENT REHABILITATION AND SAFETY
    20             IMPROVEMENTS                                3,400,000
    21             (BASE PROJECT ALLOCATION - $3,000,000)
    22             (DESIGN AND CONTINGENCIES - $400,000)
    23         (2)  CHESTER COUNTY LINE TO US 202,
    24             PAVEMENT REHABILITATION AND SAFETY
    25             IMPROVEMENTS                                2,600,000
    26             (BASE PROJECT ALLOCATION - $2,500,000)
    27             (DESIGN AND CONTINGENCIES - $100,000)
    28     (M)  VALLEY FORGE NATIONAL HISTORIC PARK                       <--
    29         (1)  CONSTRUCT ACCESS ROADS AND PARKING
    30             FACILITIES                                    250,000
    19970S0185B2061                 - 107 -

     1             (BASE PROJECT ALLOCATION - $200,000)
     2             (LAND ALLOCATION - $25,000)
     3             (DESIGN AND CONTINGENCIES - $25,000)
     4  Section 347.  Montour County.
     5     (a)  I-80
     6         (1)  Northumberland County Line to Columbia
     7             County Line, Pavement Rehabilitation
     8             and Safety Improvements                     1,100,000
     9             (Base Project Allocation - $984,000)
    10             (Land Allocation - $6,000)
    11             (Design and Contingencies - $110,000)
    12         (2)  EXIT 32 TO EXIT 34, RESTORATION              286,000  <--
    13             (BASE PROJECT ALLOCATION - $86,000)
    14             (LAND ALLOCATION - $100,000)
    15             (DESIGN AND CONTINGENCIES - $100,000)
    16  Section 348.  Northampton County.
    17     (a)  I-78
    18         (1)  Lehigh County Line to PA 412, Pavement                <--
    19             Rehabilitation and Safety Improvements        300,000
    20             (Base Project Allocation - $268,000)
    21             (Land Allocation - $2,000)
    22             (Design and Contingencies - $30,000)
    23         (2) (1)  LEHIGH COUNTY TO DELAWARE RIVER,                  <--
    24             PAVEMENT REHABILITATION AND SAFETY
    25             IMPROVEMENTS                                  300,000
    26             (BASE PROJECT ALLOCATION - $268,000)
    27             (LAND ALLOCATION - $2,000)
    28             (DESIGN AND CONTINGENCIES - $30,000)
    29     (B)  PA 412                                                    <--
    30         (1)  I-78 TO BETHLEHEM STEEL SITE, ROADWAY
    19970S0185B2061                 - 108 -

     1             IMPROVEMENTS                                  500,000
     2             (BASE PROJECT ALLOCATION - $400,000)
     3             (LAND ALLOCATION - $50,000)
     4             (DESIGN AND CONTINGENCIES - $50,000)
     5     (C)  BETHLEHEM STEEL SITE
     6         (1)  ROAD CONSTRUCTION IN AND AROUND SITE         750,000
     7             (BASE PROJECT ALLOCATION - $600,000)
     8             (LAND ALLOCATION - $75,000)
     9             (DESIGN AND CONTINGENCIES - $75,000)
    10  Section 349.  Northumberland County.
    11     (a)  I-80
    12         (1)  PA 254 to Montour County Line,                        <--
    13             Pavement Rehabilitation and Safety
    14             Improvements                                  100,000
    15             (Base Project Allocation - $89,000)
    16             (Land Allocation - $1,000)
    17             (Design and Contingencies - $10,000)
    18         (2) (1)  MONTOUR COUNTY LINE TO UNION                      <--
    19             COUNTY LINE, RESTORATION                    6,610,000
    20             (BASE PROJECT ALLOCATION - $6,000,000)
    21             (LAND ALLOCATION - $10,000)
    22             (DESIGN AND CONTINGENCIES - $600,000)
    23     (b)  T-577, Marsh Drive
    24         (1)  Access Road and Related Improvement in
    25             Milton Borough and West Chillisquaque
    26             Township                                    1,600,000
    27             (Base Project Allocation - $1,100,000)
    28             (Land Allocation - $300,000)
    29             (Design and Contingencies - $200,000)
    30     (c)  I-80                                                      <--
    19970S0185B2061                 - 109 -

     1         (1)  Milepost 207 to Milepost 214,
     2             Restoration                                   600,000
     3             (Design and Contingencies - $600,000)
     4     (C)  PA 147                                                    <--
     5         (1)  HERNDON TO SUNBURY, ADD TRUCK CLIMBING
     6             LANES                                       5,500,000
     7             (BASE PROJECT ALLOCATION - $5,000,000)
     8             (LAND ALLOCATION - $100,000)
     9             (DESIGN AND CONTINGENCIES - $400,000)
    10         (2)  TR 147 NORTH OF MILTON, ADD TWO LANES     11,843,000
    11             (BASE PROJECT ALLOCATION - $10,772,000)
    12             (LAND ALLOCATION - $134,000)
    13             (DESIGN AND CONTINGENCIES - $937,000)
    14     (D)  PA 405
    15         (1)  WATSONTOWN TO LYCOMING COUNTY LINE,
    16             PAVEMENT RESTORATION AND SAFETY
    17             IMPROVEMENTS                                  420,000
    18             (BASE PROJECT ALLOCATION - $320,000)
    19             (DESIGN AND CONTINGENCIES - $100,000)
    20     (E)  PA 61
    21         (1)  STRONG TO KULPMONT, RESTORATION              220,000
    22             (BASE PROJECT ALLOCATION - $120,000)
    23             (LAND ALLOCATION - $50,000)
    24             (DESIGN AND CONTINGENCIES - $50,000)
    25     (F)  CHIKELLANY AVENUE
    26         (1)  ROAD REPAIR AND DRAINAGE IN SUNBURY           60,000
    27  Section 350.  Perry County.
    28     (a)  SR 17
    29         (1)  Resurface and Construct Shoulder on SR
    30             17 from Jackson Township through
    19970S0185B2061                 - 110 -

     1             Saville Township                            1,080,000
     2             (Base Project Allocation - $1,000,000)
     3             (Design and Contingencies - $80,000)
     4         (2)  PA 274 TO PA 850, PAVEMENT                            <--
     5             REHABILITATION, WIDEN AND SAFETY
     6             IMPROVEMENTS                                  840,000
     7             (BASE PROJECT ALLOCATION - $700,000)
     8             (LAND ALLOCATION - $40,000)
     9             (DESIGN AND CONTINGENCIES - $100,000)
    10     (b)  SR 233
    11         (1)  Resurface and Construct Shoulder on SR
    12             233 from Green Park, Tyrone Township to
    13             Cumberland County Line                        620,000
    14             (Base Project Allocation - $600,000)
    15             (Design and Contingencies - $20,000)
    16     (c)  SR 274
    17         (1)  Resurface and Construct Shoulder on SR
    18             274 from Blain, Jackson Township, to
    19             Franklin County Line                          820,000
    20             (Base Project Allocation - $800,000)
    21             (Design and Contingencies - $20,000)
    22     (d)  SR 849
    23         (1)  Resurface and Construct Shoulder from
    24             Newport to SR 34                              930,000
    25             (Base Project Allocation - $900,000)
    26             (Design and Contingencies - $30,000)
    27     (e)  SR 850
    28         (1)  Resurface and Construct Shoulder on SR
    29             850 from Kistler to Juniata County
    30             Line                                          570,000
    19970S0185B2061                 - 111 -

     1             (Base Project Allocation - $520,000)
     2             (Design and Contingencies - $50,000)
     3         (2)  Resurface and Construct Shoulder on SR
     4             850 from SR 34 in Shermans Dale to
     5             Village of Keystone                           410,000
     6             (Base Project Allocation - $400,000)
     7             (Design and Contingencies - $10,000)
     8     (F)  US 322                                                    <--
     9         (1)  SUSQUEHANNA RIVER TO WEST OF
    10             MILLERSTOWN, RESTORATION                   28,000,000
    11             (BASE PROJECT ALLOCATION - $25,000,000)
    12             (LAND ALLOCATION - $500,000)
    13             (DESIGN AND CONTINGENCIES - $2,500,000)
    14  Section 351.  Philadelphia County.
    15     (a)  I-76
    16         (1)  Route 1 to I-95, Pavement
    17             Rehabilitation and Safety Improvements      1,000,000
    18             (Base Project Allocation - $895,000)
    19             (Land Allocation - $5,000)
    20             (Design and Contingencies - $100,000)
    21         (2)  SCHUYLKILL RIVER TO MONTGOMERY AVENUE,                <--
    22             PAVEMENT RESTORATION                        7,100,000
    23             (BASE PROJECT ALLOCATION - $7,000,000)
    24             (DESIGN AND CONTINGENCIES - $100,000)
    25         (3)  FEASIBILITY STUDY FOR NEW ENTRANCE                    <--
    26             RAMP OR NEW EXIT RAMP, OR BOTH, WEST OF
    27             MANAYUNK/BELMONT AVENUE, EXIT 31              125,000
    28     (b)  I-95
    29         (1)  Delaware County Line to Bucks County
    30             Line, Pavement and Bridge
    19970S0185B2061                 - 112 -

     1             Rehabilitation and Safety Improvements     26,440,000
     2             (Base Project Allocation - $25,340,000)
     3             (Land Allocation - $100,000)
     4             (Design and Contingencies - $1,000,000)
     5         (2)  DELAWARE COUNTY LINE TO BUCKS COUNTY                  <--
     6             LINE, PAVEMENT REHABILITATION AND
     7             SAFETY IMPROVEMENTS                         2,000,000
     8             (BASE PROJECT ALLOCATION - $1,790,000)
     9             (LAND ALLOCATION - $10,000)
    10             (DESIGN AND CONTINGENCIES - $200,000)
    11         (3) (2)  JACKSON STREET TO RITNER AVENUE,
    12             200 BLOCK OF FRONT STREET, INSTALL
    13             SAFETY/PROTECTIVE WALL                         44,000
    14             (BASE PROJECT ALLOCATION - $35,000)
    15             (DESIGN AND CONTINGENCIES - $9,000)
    16         (4) (3)  RECONSTRUCTION OF BEACH STREET                    <--
    17             NORTH OF ALLEGHENY AVENUE AS AN
    18             ALTERNATIVE ROUTE TO I-95                  10,000,000
    19         (5) (4)  RECONSTRUCTION OF ROADWAY FROM                    <--
    20             LEWIS STREET NORTH TO BRIDGE STREET AS
    21             ALTERNATIVE ROUTE TO I-95                  25,000,000
    22     (c)  Germantown Avenue
    23         (1)  Reconstruct Germantown Avenue              7,500,000
    24     (d)  SR 1007
    25         (1)  Adams Avenue Connector, Torresdale to
    26             Aramingo Avenue, New Roadway                  376,000
    27             (Base Project Allocation - $286,000)
    28             (Land Allocation - $70,000)
    29             (Design and Contingencies - $20,000)
    30     (e)  I-95                                                      <--
    19970S0185B2061                 - 113 -

     1         (1)  Jackson Street to Ritner Avenue, (200
     2             Block of Front Street), Install
     3             Safety/Protective Wall                         44,000
     4             (Base Project Allocation - $35,000)
     5             (Design and Contingencies - $9,000)
     6     (f) (E)  Chestnut Street                                       <--
     7         (1)  Chestnut Street Intermodal Improvement
     8             Project                                     4,367,000
     9         (2)  CHESTNUT STREET TRANSIT WAY                           <--
    10             RECONSTRUCTION                             10,000,000
    11     (F)  I-676
    12         (1)  VINE EXPRESSWAY, TRANSPORTATION
    13             INCIDENT MANAGEMENT SYSTEM                    462,000
    14             (BASE PROJECT ALLOCATION - $390,000)
    15             (DESIGN AND CONTINGENCIES - $72,000)
    16         (2)  15TH STREET TO 16TH STREET, CONSTRUCT                 <--
    17             PEDESTRIAN BRIDGE                             250,000
    18             (BASE PROJECT ALLOCATION - $200,000)
    19             (LAND ALLOCATION - $25,000)
    20             (DESIGN AND CONTINGENCIES - $25,000)
    21     (G)  SR 1001
    22         (1)  INTERSECTION OF RISING SUN AND ADAMS,
    23             INTERSECTION IMPROVEMENTS, UPGRADE
    24             SIGNALS AND WIDEN                             175,000
    25             (BASE PROJECT ALLOCATION - $134,000)
    26             (LAND ALLOCATION - $5,000)
    27             (DESIGN AND CONTINGENCIES - $36,000)
    28     (H)  SR 2009
    29         (1)  US 1 TO ALLEGHENY AVENUE, INTERSECTION
    30             IMPROVEMENTS AND SIGNALS                      371,000
    19970S0185B2061                 - 114 -

     1             (BASE PROJECT ALLOCATION - $272,000)
     2             (LAND ALLOCATION - $20,000)
     3             (DESIGN AND CONTINGENCIES - $79,000)
     4     (I)  SR 676
     5         (1)  VINE STREET, PAVEMENT REHABILITATION
     6             AND SAFETY IMPROVEMENTS                       350,000
     7             (BASE PROJECT ALLOCATION - $315,000)
     8             (DESIGN AND CONTINGENCIES - $35,000)
     9     (J)  DELAWARE AVENUE
    10         (1)  CONSTRUCT ROADWAY EXTENSION BETWEEN
    11             LEWIS STREET AND ORTHODOX STREET            1,200,000
    12             (BASE PROJECT ALLOCATION - $1,040,000)
    13             (LAND ALLOCATION - $130,000)
    14             (DESIGN AND CONTINGENCIES - $130,000)
    15     (K)  ACCESS
    16         (1)  ACCESS IMPROVEMENTS TO FORMER
    17             PHILADELPHIA NAVAL SHIPYARD AND BASE          500,000
    18             (BASE PROJECT ALLOCATION - $400,000)
    19             (LAND ALLOCATION - $50,000)
    20             (DESIGN AND CONTINGENCIES - $50,000)
    21     (L)  SR 2001                                                   <--
    22         (1)  SECTION LEO, CITY OF PHILADELPHIA,
    23             DELAWARE EXTENSION PROJECT,
    24             CONSTRUCTION OF A 1.4 MILE FOUR-LANE
    25             ROADWAY SECTION OF DELAWARE AVENUE
    26             BEGINNING AT DYOTT STREET AND EXTENDING
    27             NORTH TO AN INTERSECTION WITH ALLEGHENY
    28             AVENUE                                     11,750,000
    29             (BASE PROJECT ALLOCATION - $8,000,000)
    30             (LAND ALLOCATION - $2,750,000)
    19970S0185B2061                 - 115 -

     1             (DESIGN AND CONTINGENCIES - $1,000,000)
     2  Section 352.  Pike County (Reserved).
     3  Section 353.  Potter County.
     4     (a)  SR 2002
     5         (1)  Reconstruct to 22 Feet from Germania
     6             Station to Galeton                          2,595,000
     7             (Base Project Allocation - $2,157,000)
     8             (Land Allocation - $250,000)
     9             (Design and Contingencies - $188,000)
    10     (B)  PA 449                                                    <--
    11         (1)  VILLAGE OF GOLD TO NEW YORK STATE
    12             LINE, WIDEN AND PAVEMENT RESTORATION          760,000
    13             (BASE PROJECT ALLOCATION - $700,000)
    14             (LAND ALLOCATION - $20,000)
    15             (DESIGN AND CONTINGENCIES - $40,000)
    16  Section 354.  Schuylkill County.
    17     (a)  I-81
    18         (1)  PA 25 to PA 54, Pavement
    19             Rehabilitation and Safety Improvements      2,000,000
    20             (Base Project Allocation - $1,790,000)
    21             (Land Allocation - $10,000)
    22             (Design and Contingencies - $200,000)
    23         (2)  PA 901 Interchange, Reconstruction           800,000
    24             (Base Project Allocation - $716,000)
    25             (Land Allocation - $4,000)
    26             (Design and Contingencies - $80,000)
    27         (3)  SR 4007, Gordon Road, New Interchange      1,600,000  <--
    28             (Base Project Allocation - $1,432,000)
    29             (Land Allocation - $8,000)
    30             (Design and Contingencies - $160,000)
    19970S0185B2061                 - 116 -

     1         (4) (3)  Construction of a New Rest Area on
     2             I-81 northbound in Foster Township          6,240,000
     3             (Base Project Allocation - $3,900,000)
     4             (Land Allocation - $1,475,000)
     5             (Design and Contingencies - $865,000)
     6         (5) (4)  I-81, FOSTER, PAVEMENT                            <--
     7             RESTORATION                                 2,258,000
     8             (BASE PROJECT ALLOCATION - $2,218,000)
     9             (DESIGN AND CONTINGENCIES - $40,000)
    10         (6)  SR 4007, BUTLER TOWNSHIP, INTERCHANGE                 <--
    11             RECONSTRUCTION                             28,000,000
    12         (5)  SR 4007, BUTLER TOWNSHIP, NEW                         <--
    13             INTERCHANGE CONSTRUCTION                   28,000,000
    14             (BASE PROJECT ALLOCATION - $25,000,000)
    15             (LAND ALLOCATION - $1,000,000)
    16             (DESIGN AND CONTINGENCIES - $2,000,000)
    17     (b)  SR 125
    18         (1)  Resurface and Reconstruct SR 125 from
    19             SR 25 to Northumberland County Line           825,000
    20             (Base Project Allocation - $750,000)
    21             (Design and Contingencies - $75,000)
    22     (c)  SR 309
    23         (1)  Intersection Improvements with SR 443,
    24             West Penn Township                          2,050,000
    25             (Base Project Allocation - $2,000,000)
    26             (Land Allocation - $40,000)
    27             (Design and Contingencies - $10,000)
    28         (2)  Corridor Study of SR 309                     250,000
    29             (Design and Contingencies - $250,000)
    30         (3)  Resurface SR 309 from West Penn
    19970S0185B2061                 - 117 -

     1             Township line to T-503 in Tamaqua           2,500,000
     2             (Base Project Allocation - $2,400,000)
     3             (Design and Contingencies - $100,000)
     4     (d)  SR 61
     5         (1)  Resurface SR 61 from SR 183 to Mt.
     6             Carbon Line in North Manheim Township       1,600,000
     7             (Base Project Allocation - $1,520,000)
     8             (Design and Contingencies - $80,000)
     9         (2)  Construct Median Barrier on SR 61 from
    10             SR 183 to SR 2015 in North Manheim
    11             Township                                    4,660,000
    12             (Base Project Allocation - $3,800,000)
    13             (Land Allocation - $650,000)
    14             (Design and Contingencies - $210,000)
    15         (3)  Construction of Safety Improvements on
    16             SR 61 from SR 2014 to SR 895               15,000,000
    17             (Base Project Allocation - $8,000,000)
    18             (Land Allocation - $5,500,000)
    19             (Design and Contingencies - $1,500,000)
    20         (4)  PA 61, SURFACE WORK ON 4.6 MILES,                     <--
    21             PAVEMENT RESTORATION                        1,700,000
    22             (BASE PROJECT ALLOCATION - $1,600,000)
    23             (DESIGN AND CONTINGENCIES - $100,000)
    24     (e)  SR 895
    25         (1)  Restoration of SR 895 from SR 183 to
    26             South Manheim Township in Wayne
    27             Township                                    1,125,000
    28             (Base Project Allocation - $1,000,000)
    29             (Land Allocation - $25,000)
    30             (Design and Contingencies - $100,000)
    19970S0185B2061                 - 118 -

     1     (f)  SR 924
     2         (1)  Restoration of SR 924 in Vicinity of
     3             Shenandoah Heights                          1,687,000
     4             (Base Project Allocation - $1,300,000)
     5             (Land Allocation - $88,000)
     6             (Design and Contingencies - $299,000)
     7  Section 355.  Snyder County.
     8     (a)  US 11/15
     9         (1)  Golden Strip, Monroe Township, Widen
    10             Roadway and Improve the Intersections
    11             From North of Selinsgrove Bypass to
    12             Shamokin Dam Borough Line, Length 2.0
    13             Miles                                       6,000,000
    14             (Base Project Allocation - $5,300,000)
    15             (Land Allocation - $500,000)
    16             (Design and Contingencies - $200,000)
    17         (2)  MONROE TOWNSHIP TO SHAMOKIN DAM, WIDEN                <--
    18             AND INTERSECTION IMPROVEMENTS               1,400,000
    19             (BASE PROJECT ALLOCATION - $1,000,000)
    20             (LAND ALLOCATION - $100,000)
    21             (DESIGN AND CONTINGENCIES - $300,000)
    22     (B)  US 11
    23         (1)  SHAMOKIN DAM TO BLUE HILL BRIDGE,
    24             WIDEN AND RECONSTRUCT ROADWAY                 750,000
    25             (BASE PROJECT ALLOCATION - $600,000)
    26             (LAND ALLOCATION - $10,000)
    27             (DESIGN AND CONTINGENCIES - $140,000)
    28  Section 356.  Somerset County.
    29     (a)  US 219
    30         (1)  Davidsville to US 30 Interchange,
    19970S0185B2061                 - 119 -

     1             Pavement Restoration                        1,740,000
     2             (Base Project Allocation - $1,640,000)
     3             (Design and Contingencies - $100,000)
     4         (2)  EAST SOMERSET AND SOMERSET TOWNSHIP,                  <--
     5             PAVEMENT REHABILITATION AND SAFETY
     6             IMPROVEMENTS                                  780,000
     7             (BASE PROJECT ALLOCATION - $708,000)
     8             (DESIGN AND CONTINGENCIES - $72,000)
     9         (3)  MEYERSDALE TO SOMERSET, PRELIMINARY
    10             ENGINEERING                                   120,000
    11             (BASE PROJECT ALLOCATION - $120,000)
    12         (4)  NORTH SOMERSET, QUEMAHONING TOWNSHIP,
    13             PAVEMENT REHABILITATION AND SAFETY
    14             IMPROVEMENTS                                1,960,000
    15             (BASE PROJECT ALLOCATION - $1,780,000)
    16             (DESIGN AND CONTINGENCIES - $180,000)
    17     (B)  PA 56
    18         (1)  IMPROVEMENTS PHASE I, WINDBER TO
    19             BEDFORD COUNTY LINE, RESTORATION            2,000,000
    20             (BASE PROJECT ALLOCATION - $1,600,000)
    21             (LAND ALLOCATION - $200,000)
    22             (DESIGN AND CONTINGENCIES - $200,000)
    23  Section 357.  Sullivan County (Reserved).                         <--
    24  SECTION 357.  SULLIVAN COUNTY.                                    <--
    25     (A)  SR 154
    26         (1)  ELKLAND TOWNSHIP, HIGHWAY
    27             RECONSTRUCTION AND ROADWAY REALIGNMENT        350,000
    28             (BASE PROJECT ALLOCATION - $300,000)
    29             (LAND ALLOCATION - $20,000)
    30             (DESIGN AND CONTINGENCIES - $30,000)
    19970S0185B2061                 - 120 -

     1     (B)  SR 87
     2         (1)  CHERRY TOWNSHIP, HIGHWAY
     3             RECONSTRUCTION AND ROADWAY REALIGNMENT        280,000
     4             (BASE PROJECT ALLOCATION - $200,000)
     5             (LAND ALLOCATION - $40,000)
     6             (DESIGN AND CONTINGENCIES - $40,000)
     7  Section 358.  Susquehanna County.
     8     (a)  I-81
     9         (1)  Lackawanna County Line to New York
    10             State Line, Pavement Rehabilitation and
    11             Safety Improvements                         2,600,000
    12             (Base Project Allocation - $2,327,000)
    13             (Land Allocation - $13,000)
    14             (Design and Contingencies - $260,000)
    15     (B)  US 11                                                     <--
    16         (1)  KINGSLEY TO HALLSTEAD, PAVEMENT
    17             REHABILITATION AND SAFETY IMPROVEMENTS        900,000
    18             (BASE PROJECT ALLOCATION - $600,000)
    19             (DESIGN AND CONTINGENCIES - $300,000)
    20  Section 359.  Tioga County.
    21     (a)  US 15
    22         (1)  Bridge Spanning Tioga Dam, New Two-                   <--
    23             Lane Bridge                                   125,000
    24             (Design and Contingencies - $125,000)
    25         (1)  BRIDGE SPANNING TIOGA DAM, NEW TWO-                   <--
    26             LANE BRIDGE                                 1,375,000
    27             (BASE PROJECT ALLOCATION - $1,250,000)
    28             (DESIGN AND CONTINGENCIES - $125,000)
    29         (2)  LAWRENCEVILLE BYPASS, TIOGA JUNCTION
    30             TO NEW YORK STATE LINE, FOUR-LANE
    19970S0185B2061                 - 121 -

     1             RELOCATION                                  7,193,000
     2             (BASE PROJECT ALLOCATION - $6,000,000)
     3             (LAND ALLOCATION - $533,000)
     4             (DESIGN AND CONTINGENCIES - $660,000)
     5         (3)  NORTH OF MANSFIELD TO NORTH OF TIOGA,
     6             ADD TWO LANES                              10,224,000
     7             (BASE PROJECT ALLOCATION - $9,160,000)
     8             (LAND ALLOCATION - $100,000)
     9             (DESIGN AND CONTINGENCIES - $964,000)
    10     (B)  US 6
    11         (1)  MAINSBURG TO BRADFORD COUNTY LINE,
    12             RESTORATION                                   337,000
    13             (BASE PROJECT ALLOCATION - $297,000)
    14             (LAND ALLOCATION - $20,000)
    15             (DESIGN AND CONTINGENCIES - $20,000)
    16         (2)  POTTER COUNTY LINE TO WELLSBORO,
    17             PAVEMENT RESTORATION                          600,000
    18             (BASE PROJECT ALLOCATION - $300,000)
    19             (LAND ALLOCATION - $150,000)
    20             (DESIGN AND CONTINGENCIES - $150,000)
    21     (C)  PA 49
    22         (1)  EAST OF ELKLAND TO LAWRENCE TOWNSHIP
    23             LINE, PAVEMENT RESTORATION AND SAFETY
    24             IMPROVEMENTS                                  520,000
    25             (BASE PROJECT ALLOCATION - $420,000)
    26             (DESIGN AND CONTINGENCIES - $100,000)
    27     (D)  SR 6015
    28         (1)  MANSFIELD BYPASS, CANOE CAMP TO NORTH
    29             OF MANSFIELD, TWO-LANE RELOCATION           5,900,000
    30             (BASE PROJECT ALLOCATION - $5,000,000)
    19970S0185B2061                 - 122 -

     1             (LAND ALLOCATION - $500,000)
     2             (DESIGN AND CONTINGENCIES - $400,000)
     3         (2)  TIOGA JUNCTION, NORTH OF TIOGA, FOUR-
     4             LANE RELOCATION                             4,370,000
     5             (BASE PROJECT ALLOCATION - $3,760,000)
     6             (LAND ALLOCATION - $145,000)
     7             (DESIGN AND CONTINGENCIES - $465,000)
     8  Section 360.  Union County.
     9     (a)  US 15
    10         (1)  Snyder/Union County Line to T-365,
    11             Reconstruction and Safety Improvements      1,900,000
    12             (Base Project Allocation - $1,600,000)
    13             (Land Allocation - $100,000)
    14             (Design and Contingencies - $200,000)
    15  Section 361.  Venango County (Reserved).                          <--
    16  Section 362.  Warren County (Reserved).
    17         (2)  LEWISBURG TO NEW COLUMBIA,                            <--
    18             RESTORATION                                 1,000,000
    19             (BASE PROJECT ALLOCATION - $960,000)
    20             (LAND ALLOCATION - $20,000)
    21             (DESIGN AND CONTINGENCIES - $20,000)
    22     (B)  I-80
    23         (1)  CLINTON COUNTY LINE TO SR 1010 BRIDGE,
    24             DIAMOND GRINDING                              279,000
    25             (BASE PROJECT ALLOCATION - $79,000)
    26             (LAND ALLOCATION - $100,000)
    27             (DESIGN AND CONTINGENCIES - $100,000)
    28         (2)  WESTBOUND FROM US 15 TO SR 1010,
    29             PAVEMENT RESTORATION                        6,100,000
    30             (BASE PROJECT ALLOCATION - $6,000,000)
    19970S0185B2061                 - 123 -

     1             (DESIGN AND CONTINGENCIES - $100,000)
     2         (3)  WEST OF EXIT 30 TO WEST OF EXIT 31,
     3             PAVEMENT REHABILITATION AND SAFETY
     4             IMPROVEMENTS                                5,070,000
     5             (BASE PROJECT ALLOCATION - $4,800,000)
     6             (DESIGN AND CONTINGENCIES - $270,000)
     7  SECTION 361.  VENANGO COUNTY.
     8     (A)  PA 8
     9         (1)  RYND HILL ROAD TO CHERRYTREE, CORRIDOR
    10             IMPROVEMENTS                                1,240,000
    11             (BASE PROJECT ALLOCATION - $840,000)
    12             (LAND ALLOCATION - $200,000)
    13             (DESIGN AND CONTINGENCIES - $200,000)
    14         (2)  CROSS CREEK ENTRANCE NORTH,                           <--
    15             RECONSTRUCTION AND SAFETY IMPROVEMENTS      2,000,000
    16             (BASE PROJECT ALLOCATION - $1,800,000)
    17             (DESIGN AND CONTINGENCIES - $200,000)
    18         (3)  INTERSECTION WITH SR 417, INTERSECTION
    19             IMPROVEMENTS                                2,000,000
    20             (BASE PROJECT ALLOCATION - $1,800,000)
    21             (DESIGN AND CONTINGENCIES - $200,000)
    22         (4)  INTERSECTION WITH DRAKE WELL ROAD,
    23             SIGNALIZATION AND INTERSECTION
    24             IMPROVEMENTS                                  500,000
    25             (BASE PROJECT ALLOCATION - $450,000)
    26             (DESIGN AND CONTINGENCIES - $50,000)
    27         (5)  ROUTE 8, FRANKLIN BY-PASS                  2,900,000
    28             (BASE PROJECT ALLOCATION - $2,600,000)
    29             (DESIGN AND CONTINGENCIES - $300,000)
    30     (B)  PA 257
    19970S0185B2061                 - 124 -

     1         (1)  TOP OF SENECA HILL TO TR 322, ADD
     2             LANES                                       1,600,000
     3             (BASE PROJECT ALLOCATION - $1,200,000)
     4             (LAND ALLOCATION - $200,000)
     5             (DESIGN AND CONTINGENCIES - $200,000)
     6     (C)  US 322
     7         (1)  SR 257 TO TR 38, TWO-LANE
     8             RECONSTRUCTION                              1,344,000
     9             (BASE PROJECT ALLOCATION - $1,172,000)
    10             (LAND ALLOCATION - $70,000)
    11             (DESIGN AND CONTINGENCIES - $102,000)
    12         (2)  CRANBERRY TO ROUTE 38, RECONSTRUCTION                 <--
    13             AND PARTIAL RELOCATION                      6,400,000
    14             (BASE PROJECT ALLOCATION - $5,760,000)
    15             (DESIGN AND CONTINGENCIES - $640,000)
    16     (D)  PA 257
    17         (1)  CRANBERRY TO I-80, EXTENSION OF PA
    18             257                                         2,400,000
    19             (BASE PROJECT ALLOCATION - $2,160,000)
    20             (DESIGN AND CONTINGENCIES - $240,000)
    21     (E)  I-80
    22         (1)  INTERCHANGE AT LISBON                      3,100,000
    23             (BASE PROJECT ALLOCATION - $2,790,000)
    24             (DESIGN AND CONTINGENCIES - $310,000)
    25  SECTION 362.  WARREN COUNTY.
    26     (A)  SR 957
    27         (1)  RECONSTRUCTION OF INTERSECTION OF SR
    28             957 WITH CENTER ROAD AND KIRAN HILL
    29             ROAD                                          200,000
    30         (2)  INTERSECTION AT SR 4007 IN COLUMBUS
    19970S0185B2061                 - 125 -

     1             TOWNSHIP, INTERSECTION IMPROVEMENTS           330,000
     2             (BASE PROJECT ALLOCATION - $250,000)
     3             (LAND ALLOCATION - $30,000)
     4             (DESIGN AND CONTINGENCIES - $50,000)
     5     (B)  US 6
     6         (1)  WARREN SLIDE AREA IN WARREN TOWNSHIP
     7             AND CONEWAGO TOWNSHIP, PAVEMENT
     8             REHABILITATION AND SAFETY IMPROVEMENTS      1,700,000
     9             (BASE PROJECT ALLOCATION - $1,500,000)
    10             (DESIGN AND CONTINGENCIES - $200,000)
    11         (2)  WEST OF YANKEE BUSH ROAD TO T-492,
    12             WIDEN AND RECONSTRUCT                         570,000
    13             (BASE PROJECT ALLOCATION - $550,000)
    14             (LAND ALLOCATION - $5,000)
    15             (DESIGN AND CONTINGENCIES - $15,000)
    16         (3)  YOUNGSVILLE TO WARREN, PAVEMENT
    17             REHABILITATION AND SAFETY IMPROVEMENTS      3,100,000
    18             (BASE PROJECT ALLOCATION - $3,000,000)
    19             (DESIGN AND CONTINGENCIES - $100,000)
    20     (C)  SR 6
    21         (1)  T-492 TO WARREN, PAVEMENT
    22             REHABILITATION AND SAFETY IMPROVEMENTS      1,240,000
    23             (BASE PROJECT ALLOCATION - $1,200,000)
    24             (LAND ALLOCATION - $20,000)
    25             (DESIGN AND CONTINGENCIES - $20,000)
    26     (D)  SR 62
    27         (1)  TIDIOUTE TO IRVINE, PAVEMENT
    28             RESTORATION, SLIDE CORRECTION AND
    29             SAFETY IMPROVEMENTS                         1,000,000
    30             (BASE PROJECT ALLOCATION - $800,000)
    19970S0185B2061                 - 126 -

     1             (LAND ALLOCATION - $100,000)
     2             (DESIGN AND CONTINGENCIES - $100,000)
     3  Section 363.  Washington County.
     4     (a)  I-70
     5         (1)  PA 481 to Westmoreland County Line,
     6             Pavement Rehabilitation and Safety
     7             Improvements                                  600,000
     8             (Base Project Allocation - $537,000)
     9             (Land Allocation - $3,000)
    10             (Design and Contingencies - $60,000)
    11         (2)  I-79 TO PA 519, PAVEMENT RESTORATION       3,200,000  <--
    12             (BASE PROJECT ALLOCATION - $3,100,000)
    13             (DESIGN AND CONTINGENCIES - $100,000)
    14         (3)  KAMMERER TO PA 519, PAVEMENT
    15             RESTORATION                                 3,100,000
    16             (BASE PROJECT ALLOCATION - $3,000,000)
    17             (DESIGN AND CONTINGENCIES - $100,000)
    18         (4)  WEST VIRGINIA LINE TO EXIT 1,
    19             RECONSTRUCTION AND SAFETY IMPROVEMENTS        420,000
    20             (BASE PROJECT ALLOCATION - $400,000)
    21             (LAND ALLOCATION - $10,000)
    22             (DESIGN AND CONTINGENCIES - $10,000)
    23     (b)  I-79
    24         (1)  Greene, Washington, Allegheny, Butler,
    25             Lawrence, Mercer, Crawford and Erie
    26             County Lines, West Virginia to I-90,
    27             Intelligent Transportation Systems
    28             Study                                          75,000
    29             (Design and Contingencies - $75,000)
    30         (2)  Greene County Line to Milepost 48 I-                  <--
    19970S0185B2061                 - 127 -

     1             70, Pavement Rehabilitation and Safety
     2             Improvements                                2,500,000
     3             (Base Project Allocation - $2,237,000)
     4             (Land Allocation - $13,000)
     5             (Design and Contingencies - $250,000)
     6         (3)  Milepost 39.4 to Milepost 42,
     7             Meadowlands Area, Resurfacing                 240,000
     8             (Base Project Allocation - $220,000)
     9             (Design and Contingencies - $20,000)
    10         (4)  MARIANNA TO US 40, RECONSTRUCTION AND                 <--
    11             SAFETY IMPROVEMENTS                         3,020,000
    12             (BASE PROJECT ALLOCATION - $3,000,000)
    13             (LAND ALLOCATION - $10,000)
    14             (DESIGN AND CONTINGENCIES - $10,000)
    15         (5)  SOUTH STRABANE TOWNSHIP, PAVEMENT
    16             REHABILITATION AND SAFETY IMPROVEMENTS      1,080,000
    17             (BASE PROJECT ALLOCATION - $1,030,000)
    18             (DESIGN AND CONTINGENCIES - $50,000)
    19     (C)  PA 837
    20         (1)  HUSTON TO COURTNEY, RECONSTRUCTION         1,000,000
    21             (BASE PROJECT ALLOCATION - $930,000)
    22             (LAND ALLOCATION - $20,000)
    23             (DESIGN AND CONTINGENCIES - $50,000)
    24     (D)  SR 1002
    25         (1)  MCMURRAY AND VALLEYBROOK INTERSECTION,
    26             PETERS TOWNSHIP, INTERSECTION
    27             IMPROVEMENTS                                  760,000
    28             (BASE PROJECT ALLOCATION - $760,000)
    29     (E)  SR 0000
    30         (1)  CONSTRUCT NEW ROAD CONNECTING SR 3013,
    19970S0185B2061                 - 128 -

     1             FRANKLIN FARMS ROAD, TO SR 18 IN NORTH
     2             FRANKLIN TOWNSHIP, WASHINGTON COUNTY        1,096,000
     3             (BASE PROJECT ALLOCATION - $866,000)
     4             (LAND ALLOCATION - $100,000)
     5             (DESIGN AND CONTINGENCIES - $130,000)
     6     (F)  CALIFORNIA UNIVERSITY OF PENNSYLVANIA                     <--
     7         (1)  CONSTRUCT INTERMODAL FACILITY                250,000
     8             (BASE PROJECT ALLOCATION - $200,000)
     9             (LAND ALLOCATION - $25,000)
    10             (DESIGN AND CONTINGENCIES - $25,000)
    11  Section 364.  Wayne County.
    12     (a)  I-84
    13         (1)  Lackawanna County Line to Pike County
    14             Line, Pavement Rehabilitation and
    15             Safety Improvements                           600,000
    16             (Base Project Allocation - $537,000)
    17             (Land Allocation - $3,000)
    18             (Design and Contingencies - $60,000)
    19  Section 365.  Westmoreland County.
    20     (a)  I-70
    21         (1)  Washington County Line to I-76,
    22             Pavement Rehabilitation and Safety
    23             Improvements                                1,700,000
    24             (Base Project Allocation - $1,521,000)
    25             (Land Allocation - $9,000)
    26             (Design and Contingencies - $170,000)
    27         (2)  NORTH BELLE VERNON TO SR 201,                         <--
    28             RECONSTRUCTION AND SAFETY IMPROVEMENTS        470,000
    29             (BASE PROJECT ALLOCATION - $450,000)
    30             (LAND ALLOCATION - $10,000)
    19970S0185B2061                 - 129 -

     1             (DESIGN AND CONTINGENCIES - $10,000)
     2     (b)  SR 3111
     3         (1)  Center Avenue, Borough of New Stanton,
     4             Two-Lane Relocation                           940,000
     5             (Base Project Allocation - $700,000)
     6             (Land Allocation - $40,000)
     7             (Design and Contingencies - $200,000)
     8     (c)  SR 982
     9         (1)  Reconstruction of SR 982, Including
    10             Climbing Lanes from Laurelville, Mt.
    11             Pleasant Township, to Intersection with
    12             SR 31 in Fayette County                     6,500,000
    13             (Base Project Allocation - $5,000,000)
    14             (Land Allocation - $500,000)
    15             (Design and Contingencies - $1,000,000)
    16     (d)  SR 356
    17         (1)  Reconstruction of SR 356, Including
    18             Widening, Overlay, and Safety
    19             Improvements                                3,000,000
    20             (Base Project Allocation - $2,500,000)
    21             (Land Allocation - $100,000)
    22             (Design and Contingencies - $400,000)
    23     (E)  US 30                                                     <--
    24         (1)  GEORGES' STATION ROAD TO MT. VIEW,
    25             PAVEMENT RESTORATION AND SAFETY
    26             IMPROVEMENTS                                  840,000
    27             (BASE PROJECT ALLOCATION - $800,000)
    28             (LAND ALLOCATION - $20,000)
    29             (DESIGN AND CONTINGENCIES - $20,000)
    30         (2)  BEATTY CROSSROADS TO PA 981, PAVEMENT                 <--
    19970S0185B2061                 - 130 -

     1             RESTORATION AND SAFETY IMPROVEMENTS           920,000
     2             (BASE PROJECT ALLOCATION - $880,000)
     3             (LAND ALLOCATION - $20,000)
     4             (DESIGN AND CONTINGENCIES - $20,000)
     5         (3) (2)  BEATTY TO PA 981, PAVEMENT
     6             RESTORATION                                 4,600,000
     7             (BASE PROJECT ALLOCATION - $4,500,000)
     8             (DESIGN AND CONTINGENCIES - $100,000)
     9         (4) (3)  PA 981 TO KINGSTON, PAVEMENT                      <--
    10             RESTORATION                                 3,200,000
    11             (BASE PROJECT ALLOCATION - $3,100,000)
    12             (DESIGN AND CONTINGENCIES - $100,000)
    13     (F)  US 119
    14         (1)  MT. PLEASANT TO SOUTH OF YOUNGWOOD
    15             INTERCHANGE, PAVEMENT REHABILITATION
    16             AND SAFETY IMPROVEMENTS                     4,040,000
    17             (BASE PROJECT ALLOCATION - $4,000,000)
    18             (LAND ALLOCATION - $20,000)
    19             (DESIGN AND CONTINGENCIES - $20,000)
    20         (2)  MT. PLEASANT AND SCOTTDALE
    21             INTERCHANGE, INTERCHANGE IMPROVEMENTS       1,400,000
    22             (BASE PROJECT ALLOCATION - $1,000,000)
    23             (LAND ALLOCATION - $200,000)
    24             (DESIGN AND CONTINGENCIES - $200,000)
    25         (3)  NEW STANTON PARK AND RIDE, PARKING LOT
    26             AND LIGHTING                                  140,000
    27             (BASE PROJECT ALLOCATION - $80,000)
    28             (LAND ALLOCATION - $40,000)
    29             (DESIGN AND CONTINGENCIES - $20,000)
    30     (G)  PA 56
    19970S0185B2061                 - 131 -

     1         (1)  CAMBRIA COUNTY LINE TO INDIANA COUNTY
     2             LINE, ROADWAY REALIGNMENT AND
     3             RECONSTRUCTION                              7,400,000
     4             (BASE PROJECT ALLOCATION - $5,500,000)
     5             (LAND ALLOCATION - $900,000)
     6             (DESIGN AND CONTINGENCIES - $1,000,000)
     7     (H)  PA 906
     8         (1)  BELLE VERNON TO ROSTRAVER, PAVEMENT
     9             RESTORATION AND SAFETY IMPROVEMENTS           440,000
    10             (BASE PROJECT ALLOCATION - $400,000)
    11             (LAND ALLOCATION - $20,000)
    12             (DESIGN AND CONTINGENCIES - $20,000)
    13  Section 366.  Wyoming County (Reserved).                          <--
    14  SECTION 366.  WYOMING COUNTY.                                     <--
    15     (A)  US 6
    16         (1)  BRADFORD TO MESHOPPEN, PAVEMENT
    17             REHABILITATION AND SAFETY IMPROVEMENTS        574,000
    18             (BASE PROJECT ALLOCATION - $324,000)
    19             (DESIGN AND CONTINGENCIES - $250,000)
    20         (2)  MESHOPPEN TO RUSSELL HILL, PAVEMENT
    21             REHABILITATION AND SAFETY IMPROVEMENTS        438,000
    22             (BASE PROJECT ALLOCATION - $238,000)
    23             (DESIGN AND CONTINGENCIES - $200,000)
    24  Section 367.  York County.
    25     (a)  I-83
    26         (1)  US 30 TO MARYLAND STATE LINE, PAVEMENT                <--
    27             REHABILITATION AND SAFETY IMPROVEMENTS      4,000,000
    28             (BASE PROJECT ALLOCATION - $3,580,000)
    29             (LAND ALLOCATION - $20,000)
    30             (DESIGN AND CONTINGENCIES - $400,000)
    19970S0185B2061                 - 132 -

     1         (1) (2)  Feasibility Study for New Exit at                 <--
     2             Windy Hill Road, New Freedom Borough          100,000
     3             (Design and Contingencies - $100,000)
     4         (3)  LEADER HEIGHTS TO GEORGE STREET,                      <--
     5             PAVEMENT REHABILITATION AND SAFETY
     6             IMPROVEMENTS                                  468,000
     7             (BASE PROJECT ALLOCATION - $437,000)
     8             (LAND ALLOCATION - $1,000)
     9             (DESIGN AND CONTINGENCIES - $30,000)
    10         (4)  I-83 BUSINESS ROUTE, I-83 TO YORK,
    11             RESTORATION                                 8,800,000
    12             (BASE PROJECT ALLOCATION - $8,000,000)
    13             (LAND ALLOCATION - $200,000)
    14             (DESIGN AND CONTINGENCIES - $600,000)
    15         (5)  INTERCHANGE WITH PA 114, ROADWAY
    16             STRUCTURE, RAMP IMPROVEMENTS AND
    17             SIGNALIZATION                               1,806,000
    18             (BASE PROJECT ALLOCATION - $1,560,000)
    19             (LAND ALLOCATION - $122,000)
    20             (DESIGN AND CONTINGENCIES - $124,000)
    21         (6)  INTERCHANGE WITH SR 0921, CONSTRUCT
    22             NEW INTERCHANGE WITH CANAL ROAD IN EAST
    23             MANCHESTER TOWNSHIP                        30,800,000
    24             (BASE PROJECT ALLOCATION - $30,000,000)
    25             (LAND ALLOCATION - $500,000)
    26             (DESIGN AND CONTINGENCIES - $300,000)
    27         (7)  EXIT 7 AND PROSPECT ROAD,                             <--
    28             IMPROVEMENTS                                1,500,000
    29             (BASE PROJECT ALLOCATION - $1,350,000)
    30             (DESIGN AND CONTINGENCIES - $150,000)
    19970S0185B2061                 - 133 -

     1     (b)  SR 74
     2         (1)  Reconstruction of SR 74 from Red Lion
     3             to Intersection with SR 2054                1,600,000
     4             (Base Project Allocation - $1,500,000)
     5             (Design and Contingencies - $100,000)
     6     (c)  SR 3072
     7         (1)  Widen SR 3072 to Three Lanes, Hanover
     8             Borough                                       200,000
     9             (Base Project Allocation - $100,000)
    10             (Land Allocation - $50,000)
    11             (Design and Contingencies - $50,000)
    12     (d)  SR 4001
    13         (1)  Widen SR 4001 to Four Lanes from US 30
    14             to Church Road                              4,105,000
    15             (Base Project Allocation - $3,476,000)
    16             (Land Allocation - $296,000)
    17             (Design and Contingencies - $333,000)
    18     (e)  SR 0182
    19         (1)  Lane Addition, Pine Grove Road to
    20             Powder Mill Road                            1,570,000
    21     (F)  SR 94                                                     <--
    22         (1)  WIDEN AND CONSTRUCTION OF SAFETY AND
    23             OPERATIONAL IMPROVEMENTS ON SR 94 IN
    24             YORK COUNTY AND ADAMS COUNTY                2,129,000
    25             (BASE PROJECT ALLOCATION - $1,744,000)
    26             (LAND ALLOCATION - $45,000)
    27             (DESIGN AND CONTINGENCIES - $340,000)
    28         (2)  CONSTRUCTION OF INTERSECTION
    29             IMPROVEMENTS WITH SR 194 AND SR 116 IN
    30             HANOVER BOROUGH                             2,000,000
    19970S0185B2061                 - 134 -

     1     (G)  PA 194
     2         (1)  HANOVER BOROUGH AND PENN TOWNSHIP,
     3             INTERSECTION REALIGNMENT                       76,000
     4             (BASE PROJECT ALLOCATION - $60,000)
     5             (LAND ALLOCATION - $4,000)
     6             (DESIGN AND CONTINGENCIES - $12,000)
     7     (H)  US 15
     8         (1)  PA 94 TO DILLSBURG, PAVEMENT
     9             RESTORATION                                   800,000
    10             (BASE PROJECT ALLOCATION - $700,000)
    11             (DESIGN AND CONTINGENCIES - $100,000)
    12         (2)  PREVENTIVE MAINTENANCE IN YORK COUNTY
    13             AND ADAMS COUNTY INCLUDING BRIDGE
    14             REHABILITATIONS, PAVEMENT
    15             REHABILITATIONS AND SAFETY
    16             IMPROVEMENTS                                2,751,000
    17             (BASE PROJECT ALLOCATION - $2,631,000)
    18             (DESIGN AND CONTINGENCIES - $120,000)
    19     (I)  US 30
    20         (1)  HALLAM TO SUSQUEHANNA RIVER, PAVEMENT
    21             RESTORATION                                 2,600,000
    22             (BASE PROJECT ALLOCATION - $2,500,000)
    23             (DESIGN AND CONTINGENCIES - $100,000)
    24     (J)  RAIL FREIGHT FACILITY
    25         (1)  CONSTRUCT INTERMODAL RAIL FREIGHT
    26             FACILITY                                    2,200,000
    27             (BASE PROJECT ALLOCATION - $1,500,000)
    28             (LAND ALLOCATION - $300,000)
    29             (DESIGN AND CONTINGENCIES - $400,000)
    30     (K)  PA 851                                                    <--
    19970S0185B2061                 - 135 -

     1         (1)  DELTA TO FAWN GROVE BOROUGH, SAFETY
     2             IMPROVEMENTS                                2,000,000
     3             (BASE PROJECT ALLOCATION - $1,800,000)
     4             (DESIGN AND CONTINGENCIES - $200,000)
     5  Section 368.  Statewide Wetland Mitigation.
     6     (a)  Statewide
     7         (1)  Construction of Advanced Wetland
     8             Mitigation Projects Necessary to
     9             Replace Wetlands Displaced by Highway
    10             Projects                                    1,000,000
    11             (Base Project Allocation - $800,000)
    12             (Land Allocation - $100,000)
    13             (Design and Contingencies - $100,000)
    14         (2)  INSTALLATION OF SECURITY WALLS AT                     <--
    15             VARIOUS LOCATIONS AS PILOT PROJECT
    16             UNDER SECTION 801 OF THE ACT OF APRIL
    17             22, 1998 (P.L.   , NO.6A), KNOWN AS THE
    18             GENERAL APPROPRIATION ACT OF 1998          15,000,000
    19         (3)  ACQUISITION AND INSTALLATION OF
    20             CONSTANT WARNING TIME DEVICES FOR THE
    21             UPGRADE AND SAFETY IMPROVEMENT OF
    22             HIGHWAY-RAIL GRADE CROSSINGS. TWENTY
    23             PERCENT OF THE COST OF EACH SUCH
    24             ACQUISITION AND INSTALLATION SHALL BE
    25             PAID BY THE RAILROAD THAT OWNS THE
    26             TRACK UPON WHICH THE IMPROVEMENTS ARE
    27             BEING INSTALLED                            10,000,000
    28         (4)  INFRASTRUCTURE BANK                          850,000
    29             (BASE PROJECT ALLOCATION - $850,000)
    30         (5)  INTELLIGENT TRANSPORTATION SYSTEMS
    19970S0185B2061                 - 136 -

     1             STUDIES ON VARIOUS ROUTES                     800,000
     2             (DESIGN AND CONTINGENCIES - $800,000)
     3                             CHAPTER 4                              <--
     4                     TRANSFER OF TOWNSHIP ROAD
     5  SECTION 401.  TRANSFER OF TOWNSHIP ROAD.
     6     FROM AND AFTER THE EFFECTIVE DATE OF THIS ACT, THERE IS
     7  HEREBY TRANSFERRED TO AND THE COMMONWEALTH OF PENNSYLVANIA SHALL
     8  BE RESPONSIBLE FOR THE CONTROL, REPAIR, RECONSTRUCTION,
     9  MAINTENANCE AND LIABILITY ARISING ON THE FOLLOWING TOWNSHIP ROAD
    10  IN ELK COUNTY:
    11         (1)  T-520 FROM THE BEGINNING POINT ON SR 555 IN           <--
    12     BENEZETTE TOWNSHIP TO THE ENDING POINT ON SR 555 IN BENEZETTE
    13     TOWNSHIP.
    14         (2) (1)  T-647 FROM THE BEGINNING POINT ON SR 255 IN JADE
    15     TOWNSHIP TO THE ENDING POINT ON SR 555 IN JADE TOWNSHIP.
    16                             CHAPTER 5
    17                      MISCELLANEOUS PROVISIONS
    18  Section 501.  Federal funds.
    19     All moneys received from the Federal Government for the
    20  construction of the projects specifically itemized in this act
    21  are also hereby appropriated for those projects.
    22  Section 502.  Allocation of funds.
    23     Whenever as determined by the Department of Transportation
    24  that the full estimated financial costs of the projects itemized
    25  in this act are not necessary for the proper design, acquisition
    26  or construction of such projects, the excess funds no longer
    27  required may be allocated by the Pennsylvania Department of
    28  Transportation to increase the estimated costs of any one or
    29  more of the projects specifically itemized in a capital budget.
    30  Section 503.  Estimated useful life.
    19970S0185B2061                 - 137 -

     1     The General Assembly states that the estimated useful life of
     2  the highway capital projects itemized in this act is 30 years.
     3  SECTION 504.  USE OF EXISTING FUNDS.                              <--
     4     THE SUM OF $90,000,000 FOR THE I-95 AND PHILADELPHIA
     5  INTERNATIONAL AIRPORT INTERCHANGE AND ACCESS IMPROVEMENTS
     6  PROJECT IN DELAWARE COUNTY IN SECTION 323(O)(2) MAY BE PROVIDED
     7  FROM BOND FUNDS AUTHORIZED IN PREVIOUS HIGHWAY CAPITAL BUDGETS.
     8  Section 504 505.  Effective date.                                 <--
     9     This act shall take effect immediately.