CORRECTIVE REPRINT HOUSE AMENDED PRIOR PRINTER'S NOS. 178, 444, 697, PRINTER'S NO. 2078 2022, 2061
No. 185 Session of 1997
INTRODUCED BY CORMAN AND STOUT, JANUARY 23, 1997
AS RE-REPORTED FROM COMMITTEE ON APPROPRIATIONS, HOUSE OF REPRESENTATIVES, AS AMENDED, JUNE 8, 1998
AN ACT
1 Providing for the highway capital budget project itemization for
2 the fiscal year 1996-1997; AND TRANSFERRING A CERTAIN <--
3 TOWNSHIP ROAD TO THE COMMONWEALTH.
4 The General Assembly of the Commonwealth of Pennsylvania
5 hereby enacts as follows:
6 CHAPTER 1
7 GENERAL PROVISIONS
8 Section 101. Short title.
9 This act shall be known and may be cited as the Highway
10 Capital Budget Project Itemization Act of 1996-1997.
11 Section 102. Total authorization.
12 The total authorization for the capital projects itemized in
13 this act and to be constructed by the Department of
14 Transportation, its successors or assigns and to be financed
15 from current revenues of the Motor License Fund shall be
16 $2,971,444,000 $4,420,843,000 $4,705,996,000. <--
1 Section 103. Itemization of public highway projects.
2 Additional capital projects in the category of public highway
3 projects to be constructed by the Department of Transportation,
4 its successors or assigns and to be financed from current
5 revenues of the Motor License Fund are itemized in Chapter 3,
6 together with their respective estimated financial costs.
7 CHAPTER 3
8 ITEMIZED PROJECTS
9 Total
10 Project
11 Project Allocation
12 Section 301. Adams County (Reserved). <--
13 SECTION 301. ADAMS COUNTY. <--
14 (A) US 15
15 (1) PA 394 TO US 30, PAVEMENT RESTORATION 1,200,000
16 (BASE PROJECT ALLOCATION - $1,100,000)
17 (DESIGN AND CONTINGENCIES - $100,000)
18 (2) MARYLAND LINE TO US 30, PAVEMENT
19 REHABILITATION AND SAFETY IMPROVEMENTS 810,000
20 (BASE PROJECT ALLOCATION - $700,000)
21 (LAND ALLOCATION - $10,000)
22 (DESIGN AND CONTINGENCIES - $100,000)
23 (B) US 30
24 (1) SIGNAL IMPROVEMENT, CHAMBERSBURG ROAD,
25 CUMBERLAND TOWNSHIP 60,000
26 (BASE PROJECT ALLOCATION - $14,000)
27 (LAND ALLOCATION - $1,000)
28 (DESIGN AND CONTINGENCIES - $45,000)
29 (2) FRANKLIN COUNTY LINE TO CASHTOWN ROAD,
30 PAVEMENT RESTORATION 1,030,000
19970S0185B2078 - 2 -
1 (BASE PROJECT ALLOCATION - $920,000) 2 (LAND ALLOCATION - $10,000) 3 (DESIGN AND CONTINGENCIES - $100,000) 4 Section 302. Allegheny County. 5 (a) I-276 <-- 6 (1) Milepost 6 North to I-79, Pavement 7 Rehabilitation and Safety Improvements 1,300,000 8 (Base Project Allocation - $1,163,000) 9 (Land Allocation - $7,000) 10 (Design and Contingencies - $130,000) 11 (A) NORTH SHORE ROADWAY <-- 12 (1) ROADWAY AND PEDESTRIAN IMPROVEMENTS 4,001,000 13 (BASE PROJECT ALLOCATION - $3,201,000) 14 (LAND ALLOCATION - $400,000) 15 (DESIGN AND CONTINGENCIES - $400,000) 16 (b) I-376 17 (1) PA 130 to I-76, Pavement 18 Rehabilitation and Safety Improvements 500,000 19 (Base Project Allocation - $447,000) 20 (Land Allocation - $3,000) 21 (Design and Contingencies - $50,000) 22 (2) I-376 Access Ramp, Construction of an 23 Off-Ramp from Parkway East to 24 Pittsburgh Technology Center Site 12,000,000 25 (3) GRANT STREET TO GREENSBURG PARKWAY, <-- 26 RESTORATION 2,300,000 27 (BASE PROJECT ALLOCATION - $2,000,000) 28 (DESIGN AND CONTINGENCIES - $300,000) 29 (4) PENNSYLVANIA TURNPIKE TO SQUIRREL HILL 30 TUNNEL, INTELLIGENT TRANSPORTATION 19970S0185B2078 - 3 -
1 SYSTEMS IMPROVEMENTS 5,100,000 2 (BASE PROJECT ALLOCATION - $5,000,000) 3 (DESIGN AND CONTINGENCIES - $100,000) 4 (c) PA 19 5 (1) Gilkeson Road to Cochran Road, 6 Pavement Rehabilitation and Safety 7 Improvements 450,000 8 (Base Project Allocation - $450,000) 9 (d) Fort Duquesne Boulevard 10 (1) Realignment of Fort Duquesne 11 Boulevard 8,400,000 12 (e) Liberty Avenue 13 (1) Reconstruction of Liberty Avenue 6,600,000 14 (f) North Shore Drive 15 (1) Relocation of North Shore Drive to the 16 North Side of Three Rivers Stadium Site 17 in Order to Open Access to the 18 Riverfront 8,100,000 19 (g) I-79 20 (1) Completion of the Interchange at I-79 21 and SR 0060 to Permit Easier Access to 22 Airport 10,000,000 23 (2) Design and construction of an 24 Interchange at I-79 and Parkway West to 25 Permit Easier Access to and from the 26 Airport and I-79 17,125,000 <-- 27 (Base Project Allocation - $15,000,000) 28 (Design and Contingencies - $2,125,000) 29 AIRPORT AND I-79 43,400,000 <-- 30 (BASE PROJECT ALLOCATION - $40,000,000) 19970S0185B2078 - 4 -
1 (DESIGN AND CONTINGENCIES - $3,400,000) 2 (3) Construct Missing Link Between I-79 3 and Parkway West 16,000,000 4 (4) GROVETON TO GLENFIELD, PHASE I HIGHWAY <-- 5 AND BRIDGE REHABILITATION 250,000 6 (BASE PROJECT ALLOCATION - $200,000) 7 (DESIGN AND CONTINGENCIES - $50,000) 8 (5) GROVETON TO GLENFIELD, PHASE II 9 HIGHWAY AND BRIDGE REHABILITATION 1,320,000 10 (BASE PROJECT ALLOCATION - $1,120,000) 11 (DESIGN AND CONTINGENCIES - $200,000) 12 (6) I-79 CORRIDOR FROM WEST VIRGINIA STATE 13 LINE TO ERIE, INTELLIGENT 14 TRANSPORTATION SYSTEMS IMPROVEMENTS 3,100,000 15 (BASE PROJECT ALLOCATION - $3,000,000) 16 (DESIGN AND CONTINGENCIES - $100,000) 17 (h) US 22/30 18 (1) Reconstruction of US 22/30 Between 19 Imperial Exit and McDonald Exit 15,000,000 20 (2) WASHINGTON COUNTY LINE TO US 30, <-- 21 PAVEMENT RESTORATION 13,000,000 22 (BASE PROJECT ALLOCATION - $12,900,000) 23 (DESIGN AND CONTINGENCIES - $100,000) 24 (i) SR 0028 25 (1) Widen SR 0028 Between Downtown and 26 40th Street Bridge 30,000,000 27 (2) Installation of Noise Barriers on both <-- 28 sides of SR 0028 from Highland Park 29 Bridge to Lexington Avenue in Aspinwall 30 Borough 5,000,000 19970S0185B2078 - 5 -
1 (2) BLAWNOX TO POWERS RUN ROAD, O'HARA <-- 2 TOWNSHIP, PAVEMENT REHABILITATION, 3 RESURFACE AND SAFETY IMPROVEMENT 621,000 4 (BASE PROJECT ALLOCATION - $540,000) 5 (DESIGN AND CONTINGENCIES - $81,000) 6 (3) RAVINE TO BLAWNOX, O'HARA TOWNSHIP, 7 PAVEMENT REHABILITATION, RESURFACE AND 8 SAFETY IMPROVEMENTS 770,000 9 (BASE PROJECT ALLOCATION - $670,000) 10 (DESIGN AND CONTINGENCIES - $100,000) 11 (j) SR 0051 12 (1) Reconstruction of Intersection of SR 13 0051 and SR 0088 14,518,000 14 (2) SR 0088 TO SR 3104, 51 SIGNALS, SIGNAL <-- 15 IMPROVEMENTS 45,000 16 (BASE PROJECT ALLOCATION - $37,000) 17 (LAND ALLOCATION - $1,000) 18 (DESIGN AND CONTINGENCIES - $7,000) 19 (3) LIBERTY TUNNELS TO LEBANON CHURCH 20 ROAD, PAVEMENT RESTORATION AND SAFETY 21 IMPROVEMENTS 700,000 22 (BASE PROJECT ALLOCATION - $600,000) 23 (DESIGN AND CONTINGENCIES - $100,000) 24 (4) MCKEES ROCKS BRIDGE INTERSECTION, 25 WIDEN AND SIGNALIZATION 44,000 26 (BASE PROJECT ALLOCATION - $31,000) 27 (LAND ALLOCATION - $7,000) 28 (DESIGN AND CONTINGENCIES - $6,000) 29 (5) SOUTHBOUND, ROBERT HOLLOW ROAD TO 30 PAYDAY, PAVEMENT REHABILITATION AND 19970S0185B2078 - 6 -
1 SAFETY IMPROVEMENTS 320,000 2 (BASE PROJECT ALLOCATION - $300,000) 3 (DESIGN AND CONTINGENCIES - $20,000) 4 (6) SR 2040 TO SR 0088, CONSTRUCT 200 5 SPACE PARK AND RIDE LOT 124,000 6 (BASE PROJECT ALLOCATION - $120,000) 7 (LAND ALLOCATION - $2,000) 8 (DESIGN AND CONTINGENCIES - $2,000) 9 (7) WOODRUFF CONNECTOR, MISCELLANEOUS 10 IMPROVEMENTS 158,000 11 (BASE PROJECT ALLOCATION - $28,000) 12 (LAND ALLOCATION - $127,000) 13 (DESIGN AND CONTINGENCIES - $3,000) 14 (8) CONSTRUCT PARK AND RIDE LOT, 15 BRENTWOOD 27,000 16 (BASE PROJECT ALLOCATION - $20,000) 17 (LAND ALLOCATION - $4,000) 18 (DESIGN AND CONTINGENCIES - $3,000) 19 (k) Smithfield Street 20 (1) Reconstruction of the Smithfield 21 Street Bridge to Support Retail 22 Activity 18,000,000 23 (l) Wood Street 24 (1) Reconstruction of Wood Street to 25 Support Retail Activities 27,000,000 26 (m) Fifth and Forbes Reconstruction 27 (1) Reconstruction to Fifth and Forbes 28 Avenue Corridor to Promote Retail 29 Development 12,000,000 30 (n) Golden Triangle Intermodal Facility/LRT 19970S0185B2078 - 7 -
1 Station 2 (1) Development of a New Intermodal 3 Facility and Transit Stop to Serve the 4 Retail Centers in Downtown 13,000,000 5 (o) North Side Intermodal Facility 6 (1) Development of a Major Commuter 7 Interceptor Intermodal Facility and 8 Transit Station on the North Side 34,420,000 9 (p) Findlay Connector 10 (1) Construction of Highway Connection 11 Between Pittsburgh International 12 Airport and Route 22 West in Order to 13 Assist the Development of the Airport 14 Technology Center 100,000,000 <-- 15 TECHNOLOGY CENTER 135,000,000 <-- 16 (q) Cargo Interchange 17 (1) Development of State-of-the-Art Cargo 18 Interchange Facility at the Cargo 19 Terminal of the Greater Pittsburgh 20 International Airport to Support 21 Regional Business Growth in Global 22 Markets 16,000,000 23 (r) Lawrenceville Industrial Access Road 24 (1) Construction of a Highway Bypass to 25 Permit Truck and Passenger Cars Easier 26 Access into and through the 27 Lawrenceville Industrial and Commercial 28 Areas 46,800,000 29 (s) Mon-Fayette Expressway 30 (1) Construction of the Mon-Fayette 19970S0185B2078 - 8 -
1 Expressway from Pittsburgh to Route 51 675,000,000 <-- 2 EXPRESSWAY FROM PITTSBURGH TO ROUTE 51 700,000,000 <-- 3 (2) CONSTRUCTION TO PENN HILLS 2,000,000 <-- 4 (t) Multi-Modal Corridor 5 (1) Transportation System Connecting 6 Downtown Pittsburgh with the Greater 7 Pittsburgh International Airport 363,750,000 8 (u) Tech World/Airport Transit Connection 9 (1) Creation of a Transit Connection 10 Between the Airport Technology Center 11 and the Greater Pittsburgh 12 International Airport 135,000,000 13 (v) Settlers Cabin Interchange 14 (1) Construction of a New Interchange 15 Along Parkway West in Robinson 16 Township 10,750,000 17 (w) South Portal of Liberty Tubes 18 (1) Construction of a New Free-Flowing 19 Intersection to Accommodate Traffic 20 Flow 23,450,000 21 (x) Ewing Interchange 22 (1) Construction of a New Interchange 23 Along Parkway West in Moon Township 24 Adjacent to the Pittsburgh 25 International Airport 16,350,000 26 (y) West End Circle 27 (1) Purchase of a Portion of West End 28 Branch of Wheeling and Lake Erie 29 Railway Right-of-Way to Accommodate 30 West End Circle Project of PennDOT and 19970S0185B2078 - 9 -
1 Reconstruct Railroad Interchange with 2 CSXT via the Pittsburgh Industrial 3 Railroad South of Bridgeville between 4 Milepost 57 and Milepost 61 12,800,000 5 (Land Allocation - $12,500,000) 6 (Design and Contingencies - $300,000) 7 (z) Pittsburgh Transportation Corridor 8 (1) Purchase Wheeling and Lake Erie 9 Railway Main Right-of-Way from Rook 10 Yard (Milepost 56 to Longview Milepost 11 46) to Create Two New Transportation 12 Corridors to Downtown Pittsburgh 18,400,000 13 (Land Allocation - $18,000,000) 14 (Design and Contingencies - $400,000) 15 (aa) Pittsburgh Technology Center 16 (1) Construction of an Access Road between 17 Pittsburgh Technology Center and South 18 Side of LTV Site 5,000,000 19 (bb) SR 3009 20 (1) Improvement of Intersection of SR 21 3009, Baptist Road, and SR 2040, 22 Broughton Road, Bethel Park 1,200,000 23 (Base Project Allocation - $1,000,000) 24 (Land Allocation - $100,000) 25 (Design and Contingencies - $100,000) 26 (cc) SR 2040 to SR 88 27 (1) 200-Space Park'n Ride Lot 124,000 28 (Base Project Allocation - $120,000) 29 (Land Allocation - $2,000) 30 (Design and Contingencies - $2,000) 19970S0185B2078 - 10 -
1 (dd) I-279, I-376 <-- 2 (1) Connector TO I-376, City of <-- 3 Pittsburgh, New Construction 320,000 <-- 4 (Design and Contingencies - $320,000) 5 CONSTRUCTION 3,120,000 <-- 6 (BASE PROJECT ALLOCATION - $2,800,000) 7 (DESIGN AND CONTINGENCIES - $320,000) 8 (2) BANKSVILLE INTERCHANGE, ROAD WIDENING 9 AND RESTORATION 98,000 10 (BASE PROJECT ALLOCATION - $65,000) 11 (LAND ALLOCATION - $4,000) 12 (DESIGN AND CONTINGENCIES - $29,000) 13 (3) CITY OF PITTSBURGH TO ROSS TOWNSHIP, 14 SAFETY IMPROVEMENTS, AUTOMATE HOV LANE 610,000 15 (BASE PROJECT ALLOCATION - $535,000) 16 (DESIGN AND CONTINGENCIES - $75,000) 17 (4) SLOPE EROSION IN FRANKLIN PARK 18 BOROUGH, OHIO AND ROSS TOWNSHIPS, 19 MISCELLANEOUS, SLOPE EROSION AND 20 MOVEMENT 90,000 21 (BASE PROJECT ALLOCATION - $75,000) 22 (DESIGN AND CONTINGENCIES - $15,000) 23 (5) MILEPOST 6 NORTH TO I-79, PAVEMENT 24 REHABILITATION AND SAFETY IMPROVEMENTS 1,300,000 25 (BASE PROJECT ALLOCATION - $1,163,000) 26 (LAND ALLOCATION - $7,000) 27 (DESIGN AND CONTINGENCIES - $130,000) 28 (6) MSE WALL AT JACKS RUN, WALL 29 REHABILITATION 95,000 30 (BASE PROJECT ALLOCATION - $70,000) 19970S0185B2078 - 11 -
1 (DESIGN AND CONTINGENCIES - $25,000) 2 (7) MT. NEBO ROAD SLIDE IN OHIO TOWNSHIP, 3 MISCELLANEOUS, SLIDE REMEDIATION 222,000 4 (BASE PROJECT ALLOCATION - $190,000) 5 (DESIGN AND CONTINGENCIES - $32,000) 6 (8) SERVICE ROAD A, OHIO TOWNSHIP, 7 MISCELLANEOUS, SLOPE MOVEMENT 8 REMEDIATION 90,000 9 (BASE PROJECT ALLOCATION - $75,000) 10 (DESIGN AND CONTINGENCIES - $15,000) 11 (9) MACALEER ROAD BRIDGE TO BEAR RUN, 12 SLOPE INSTABILITY, MISCELLANEOUS, SLOPE 13 STABILIZATION 65,000 14 (BASE PROJECT ALLOCATION - $55,000) 15 (DESIGN AND CONTINGENCIES - $10,000) 16 (10) CONSTRUCTION OF NEW EXIT AND ENTRANCE <-- 17 RAMPS FOR THE NORTH SHORE EXPRESSWAY, 18 I-279 NEAR INTERSECTION WITH FEDERAL 19 STREET, CITY OF PITTSBURGH 18,000,000 20 (ee) SR 2046 21 (1) Widen and Realign Intersection of 22 Streets Run Road at Prospect Road in 23 Baldwin Borough 300,000 24 (2) STREETS RUN ROAD HIGHWAY AND BRIDGE <-- 25 REHABILITATION 125,000 26 (BASE PROJECT ALLOCATION - $110,000) 27 (LAND ALLOCATION - $5,000) 28 (DESIGN AND CONTINGENCIES - $10,000) 29 (ff) SR 2120 30 (1) Widen Intersection of Brinton Road and 19970S0185B2078 - 12 -
1 Yost Boulevard in Braddock Hills 2 Borough 75,000 3 (gg) SR 22 4 (1) Realign and Correct Slide of William 5 Penn Highway in Churchill Borough 3,000,000 6 (hh) SR 837 7 (1) Add Additional Lanes to SR 837 in 8 Homestead Borough 50,000 9 (ii) SR 2064 10 (1) Realign and Stabilize Lime Hollow Road 11 in Penn Hills Borough 200,000 12 (jj) SR 0791 13 (1) Add Turning Lane on Rodi Road at 14 Hoover Road in Penn Hills Borough 500,000 15 (kk) SR 0791 <-- 16 (1) (2) Add Turning Lane on Rodi Road at <-- 17 Duff Road in Penn Hills Borough 500,000 18 (ll) SR 0791 <-- 19 (1) (3) Add Turning Lane on Rodi Road at <-- 20 Stoneledge in Penn Hills Borough 500,000 21 (mm) (KK) Lawrenceville Industrial Access Road <-- 22 (1) Construction of a 2-Lane, 38-Mile 23 Access Highway along the Allegheny 24 River Between 21st and 62nd Streets in 25 the City of Pittsburgh's Lawrenceville 26 Neighborhood 50,000,000 27 (LL) LIBERTY WAY <-- 28 (1) RECONSTRUCTION OF LIBERTY WAY IN 29 LIBERTY BOROUGH 250,000 30 (BASE PROJECT ALLOCATION - $175,000) 19970S0185B2078 - 13 -
1 (LAND ALLOCATION - $25,000) 2 (DESIGN AND CONTINGENCIES - $50,000) 3 (MM) SR 1001 4 (1) INTERSECTION WITH CORBET STREET IN 5 TARENTUM BOROUGH, INSTALLATION OF 6 TRAFFIC SIGNALS 100,000 7 (BASE PROJECT ALLOCATION - $80,000) 8 (DESIGN AND CONTINGENCIES - $20,000) 9 (NN) NORTHSHORE/CENTRAL BUSINESS DISTRICT 10 TRANSPORTATION IMPROVEMENT PROJECT 11 (1) REGIONAL HIGHWAY ACCESS IMPROVEMENTS 12 ON PITTSBURGH'S NORTH SHORE INCLUDING 13 RAMP CONNECTIONS WITH THE REGIONAL 14 HIGHWAY SYSTEM 7,756,000 15 (BASE PROJECT ALLOCATION - $6,975,000) 16 (DESIGN AND CONTINGENCIES - $775,000) 17 (OO) SR 3160 18 (1) WHITE SWAN TO BEAVER COUNTY LINE, 19 PAVEMENT RESTORATION 6,800,000 20 (BASE PROJECT ALLOCATION - $6,700,000) 21 (DESIGN AND CONTINGENCIES - $100,000) 22 (2) HANGAR ROAD TO SOUTHERN EXPRESSWAY, 23 PAVEMENT REHABILITATION AND SAFETY 24 IMPROVEMENTS 1,100,000 25 (BASE PROJECT ALLOCATION - $1,000,000) 26 (DESIGN AND CONTINGENCIES - $100,000) 27 (PP) PA 48 28 (1) INTERSECTION WITH PA 130, MONROEVILLE, 29 INTERSECTION IMPROVEMENTS 1,500,000 30 (BASE PROJECT ALLOCATION - $1,000,000) 19970S0185B2078 - 14 -
1 (LAND ALLOCATION - $250,000) 2 (DESIGN AND CONTINGENCIES - $250,000) 3 (QQ) PA 130 4 (1) ELECTRIC AVENUE TO THOMAS STREET, 5 PAVEMENT REHABILITATION AND SAFETY 6 IMPROVEMENTS 621,000 7 (BASE PROJECT ALLOCATION - $540,000) 8 (DESIGN AND CONTINGENCIES - $81,000) 9 (RR) PA 837 10 (1) DUQUESNE-MCKEESPORT BRIDGE TO NORTH 11 2ND STREET, PAVEMENT REHABILITATION AND 12 SAFETY IMPROVEMENTS 450,000 13 (BASE PROJECT ALLOCATION - $410,000) 14 (DESIGN AND CONTINGENCIES - $40,000) 15 (SS) SR 1001 16 (1) FREEPORT ROAD, NORTH KENSINGTON BRIDGE 17 TO TARENTUM BRIDGE, PAVEMENT 18 RESTORATION 1,852,000 19 (BASE PROJECT ALLOCATION - $1,700,000) 20 (DESIGN AND CONTINGENCIES - $152,000) 21 (TT) SR 4003 22 (1) MCKNIGHT ROAD FROM NELSON RUN TO 23 HOUSTON ROAD, PAVEMENT RESTORATION 415,000 24 (BASE PROJECT ALLOCATION - $400,000) 25 (DESIGN AND CONTINGENCIES - $15,000) 26 (UU) SR 0000 27 (1) CAMPBELLS RUN ROAD, ROBINSON TOWNSHIP, 28 CONSTRUCT PARK AND RIDE LOT 66,000 29 (BASE PROJECT ALLOCATION - $40,000) 30 (LAND ALLOCATION - $20,000) 19970S0185B2078 - 15 -
1 (DESIGN AND CONTINGENCIES - $6,000) 2 (VV) LORISH ROAD 3 (1) LORISH ROAD, KENNEDY TOWNSHIP, 4 CONSTRUCT PARK AND RIDE LOT 44,000 5 (BASE PROJECT ALLOCATION - $35,000) 6 (LAND ALLOCATION - $4,000) 7 (DESIGN AND CONTINGENCIES - $5,000) 8 (WW) PA 148 9 (1) MCKEESPORT-DUQUESNE BRIDGE, ACCESS 10 IMPROVEMENTS 1,000,000 11 (BASE PROJECT ALLOCATION - $800,000) 12 (LAND ALLOCATION - $100,000) 13 (DESIGN AND CONTINGENCIES - $100,000) 14 (XX) US 30 <-- 15 (1) WIDENING AND INSTALLATION OF MEDIAN 16 BARRIERS, AND RECONSTRUCTION FROM THE 17 WESTINGHOUSE BRIDGE TO NORTH BRADDOCK 18 LINE 5,800,000 19 (BASE PROJECT ALLOCATION - $5,000,000) 20 (LAND ALLOCATION - $350,000) 21 (DESIGN AND CONTINGENCIES - $450,000) 22 (2) FIVE POINTS INTERSECTION WITH SR 3066 23 AND WEST ALLEGHENY ROAD, NORTH FAYETTE 24 TOWNSHIP, INTERSECTION IMPROVEMENT 875,000 25 (BASE PROJECT ALLOCATION - $760,000) 26 (LAND ALLOCATION - $35,000) 27 (DESIGN AND CONTINGENCIES - $80,000) 28 (YY) EAST LIBERTY/PENN CIRCLE REHABILITATION, 29 CITY OF PITTSBURGH 4,950,000 30 (BASE PROJECT ALLOCATION - $4,500,000) 19970S0185B2078 - 16 -
1 (DESIGN AND CONTINGENCIES - $450,000) 2 (ZZ) CRTRCS PHASE 2, CITY OF PITTSBURGH 800,000 3 (BASE PROJECT ALLOCATION - $650,000) 4 (DESIGN AND CONTINGENCIES - $150,000) 5 (AAA) MCARDLE ROADWAY RECONSTRUCTION, CITY OF 6 PITTSBURGH 10,200,000 7 (BASE PROJECT ALLOCATION - $9,200,000) 8 (DESIGN AND CONTINGENCIES - $1,000,000) 9 (BBB) OAKLAND IMPROVEMENTS 10 (1) FIFTH AVENUE, CITY OF PITTSBURGH 2,350,000 11 (BASE PROJECT ALLOCATION - $2,000,000) 12 (DESIGN AND CONTINGENCIES - $350,000) 13 (CCC) OAKLAND IMPROVEMENTS 14 (1) FORBES AVENUE, CITY OF PITTSBURGH 800,000 15 (BASE PROJECT ALLOCATION - $700,000) 16 (DESIGN AND CONTINGENCIES - $100,000) 17 (DDD) RIVER AVENUE 18 (1) RECONSTRUCTION, CITY OF PITTSBURGH 4,900,000 19 (BASE PROJECT ALLOCATION - $4,300,000) 20 (DESIGN AND CONTINGENCIES - $600,000) 21 (EEE) STRAWBERRY WAY 22 (1) IMPROVEMENTS, CITY OF PITTSBURGH 3,850,000 23 (BASE PROJECT ALLOCATION - $3,500,000) 24 (DESIGN AND CONTINGENCIES - $350,000) 25 (FFF) WENZEL AVENUE 26 (1) IMPROVEMENTS, CITY OF PITTSBURGH 2,900,000 27 (BASE PROJECT ALLOCATION - $2,500,000) 28 (DESIGN AND CONTINGENCIES - $400,000) 29 (GGG) RODI 30 (1) AT DUFF INTERSECTION, PENN HILLS 400,000 19970S0185B2078 - 17 -
1 (2) AT HOOVER INTERSECTION, PENN HILLS 250,000
2 (HHH) I-579
3 (1) EXIT RAMP OFF VETERAN'S MEMORIAL
4 BRIDGE SOUTH TO SR 28, CITY OF
5 PITTSBURGH 9,000,000
6 (III) OLD ROUTE 60
7 (1) PITTSBURGH AIRPORT, CONSTRUCT GRADE
8 SEPARATED INTERCHANGE 5,000,000
9 (BASE PROJECT ALLOCATION - $4,000,000)
10 (LAND ALLOCATION - $500,000)
11 (DESIGN AND CONTINGENCIES - $500,000)
12 Section 303. Armstrong County (Reserved). <--
13 SECTION 303. ARMSTRONG COUNTY. <--
14 (A) US 422
15 (1) BLANKET HILL TO ELDERTON, PAVEMENT
16 REHABILITATION AND SAFETY IMPROVEMENTS 420,000
17 (BASE PROJECT ALLOCATION - $400,000)
18 (DESIGN AND CONTINGENCIES - $20,000)
19 (2) BUTLER COUNTY LINE TO INDIANA COUNTY
20 LINE, PAVEMENT REHABILITATION AND
21 SAFETY IMPROVEMENTS 220,000
22 (BASE PROJECT ALLOCATION - $200,000)
23 (DESIGN AND CONTINGENCIES - $20,000)
24 (3) KITTANNING BYPASS, PHASE I, EAST OF
25 KITTANNING BOROUGH, RELOCATION AND
26 PAVEMENT REHABILITATION 220,000
27 (BASE PROJECT ALLOCATION - $200,000)
28 (DESIGN AND CONTINGENCIES - $20,000)
29 (B) PA 210
30 (1) POWER PLANT ROAD, PAVEMENT
19970S0185B2078 - 18 -
1 REHABILITATION AND SAFETY IMPROVEMENTS 620,000 2 (BASE PROJECT ALLOCATION - $600,000) 3 (DESIGN AND CONTINGENCIES - $20,000) 4 (C) PA 28 5 (1) DISTANT NORTH CLIMBING LANE, PAVEMENT 6 RESTORATION 5,000,000 7 (BASE PROJECT ALLOCATION - $4,900,000) 8 (DESIGN AND CONTINGENCIES - $100,000) 9 (D) PA 85 10 (1) RURAL VALLEY RESTORATION, PAVEMENT 11 REHABILITATION AND SAFETY IMPROVEMENTS 220,000 12 (BASE PROJECT ALLOCATION - $200,000) 13 (DESIGN AND CONTINGENCIES - $20,000) 14 (E) SR 4023 15 (1) TARRTOWN, EAST FRANKLIN TOWNSHIP, 16 RESTORATION, RESURFACE AND RELOCATION 3,393,000 17 (BASE PROJECT ALLOCATION - $3,000,000) 18 (LAND ALLOCATION - $300,000) 19 (DESIGN AND CONTINGENCIES - $93,000) 20 Section 304. Beaver County. 21 (a) SR 51 22 (1) Reconstruct and rehabilitate SR 51, 23 including hillside in City of 24 Aliquippa 25,000,000 25 (Base Project Allocation - $25,000,000) 26 (b) PA 151 27 (1) Hopewell Industrial Park to PA 60, 28 Hopewell Township, Reconstruction 83,000 29 (Base Project Allocation - $75,000) 30 (Design and Contingencies - $8,000) 19970S0185B2078 - 19 -
1 (C) PA 18 <-- 2 (1) BRODHEAD ROAD TO MONACA, PAVEMENT 3 REHABILITATION AND SAFETY IMPROVEMENTS 420,000 4 (BASE PROJECT ALLOCATION - $350,000) 5 (DESIGN AND CONTINGENCIES - $70,000) 6 (D) PA 60 7 (1) OHIO RIVER TO PA 51, PAVEMENT 8 RESTORATION 11,765,000 9 (BASE PROJECT ALLOCATION - $10,550,000) 10 (DESIGN AND CONTINGENCIES - $1,215,000) 11 (E) PA 68 12 (1) WOLF RUN TO BARCLAY HILL, REALIGNMENT 13 AND RESURFACE 696,000 14 (BASE PROJECT ALLOCATION - $481,000) 15 (LAND ALLOCATION - $115,000) 16 (DESIGN AND CONTINGENCIES - $100,000) 17 (F) SR 2001 18 (1) INSTALLATION OF TRAFFIC SIGNAL AT THE 19 INTERSECTION OF STATE STREET (SR 2001) 20 AND LOGANS LANE IN HARMONY TOWNSHIP 40,000 21 (G) SR 989 AND AMBRIDGE BOROUGH 22 (1) INSTALLATION OF TRAFFIC SIGNALS IN THE 23 BOROUGH OF AMBRIDGE, INCLUDING 24 INTERSECTION OF 8TH STREET AND DUSS 25 AVENUE (SR 989) 500,000 26 (H) T-606, PARK QUARRY ROAD 27 (1) CROWS RUN VALLEY IN NEW SEWICKLEY 28 TOWNSHIP TO CONWAY WALLROSE ROAD IN 29 ECONOMY BOROUGH, RESTORATION OF FLOOD 30 DAMAGE 500,000 19970S0185B2078 - 20 -
1 Section 305. Bedford County.
2 (a) PA 56
3 (1) PA 56 Extension, Bedford Township
4 Access Road and Related Improvements 325,000
5 (Base Project Allocation - $250,000)
6 (Land Allocation - $50,000)
7 (Design and Contingencies - $25,000)
8 (2) PA 56 EXTENSION, BEDFORD TOWNSHIP, <--
9 TWO-LANE EXTENSION 1,000,000
10 (BASE PROJECT ALLOCATION - $550,000)
11 (LAND ALLOCATION - $400,000)
12 (DESIGN AND CONTINGENCIES - $50,000)
13 (3) IMPROVEMENTS PHASE II, SOMERSET COUNTY
14 LINE TO I-99, RESTORATION 2,000,000
15 (BASE PROJECT ALLOCATION - $1,600,000)
16 (LAND ALLOCATION - $200,000)
17 (DESIGN AND CONTINGENCIES - $200,000)
18 (4) HIGHWAY IMPROVEMENTS IN CHESTNUT RIDGE
19 SCHOOL DISTRICT 1,000,000
20 (BASE PROJECT ALLOCATION - $750,000)
21 (LAND ALLOCATION - $100,000)
22 (DESIGN AND CONTINGENCIES - $150,000)
23 (b) I-99
24 (1) Bedford Borough Line North to Blair
25 County Line, Roadway Rehabilitation and
26 Safety Improvements 1,440,000
27 (Base Project Allocation - $1,320,000)
28 (Land Allocation - $60,000)
29 (Design and Contingencies - $60,000)
30 (c) Construction of Wetlands <--
19970S0185B2078 - 21 -
1 (1) Construction of Numerous Five-Acre to 2 Ten-Acre Wetland Projects to Be Used 3 for Future Mitigation Purposes for 4 Highway Construction in Bedford, Blair, 5 Cambria, Fulton, Huntingdon and 6 Somerset Counties 500,000 7 (Base Project Allocation - $300,000) 8 (Land Allocation - $50,000) 9 (Design and Contingencies - $150,000) 10 (d) I-99 11 (1) (2) Bedford and Blair Counties, US 220 <-- 12 Conversion to I-99 20,000 13 (Base Project Allocation - $20,000) 14 (3) PENNSYLVANIA TURNPIKE TO CESSNA <-- 15 INTERCHANGE, PAVEMENT RESTORATION 1,257,000 16 (BASE PROJECT ALLOCATION - $657,000) 17 (DESIGN AND CONTINGENCIES - $600,000) 18 (C) US 220 19 (1) BEDFORD SOUTH, RESURFACE, PAVEMENT 20 REHABILITATION AND SAFETY IMPROVEMENTS 1,780,000 21 (BASE PROJECT ALLOCATION - $1,620,000) 22 (DESIGN AND CONTINGENCIES - $160,000) 23 (2) US 30 SOUTH TO END OF FOUR-LANE, 24 RESTORATION 9,500,000 25 (BASE PROJECT ALLOCATION - $8,000,000) 26 (LAND ALLOCATION - $500,000) 27 (DESIGN AND CONTINGENCIES - $1,000,000) 28 (e) (D) SR 4009 <-- 29 (1) Improvements of Intersection of SR 30 4009, Sunnyside Road and SR 1001, North 19970S0185B2078 - 22 -
1 Richard Street, Bedford Borough 550,000 2 (Base Project Allocation - $400,000) 3 (Land Allocation - $75,000) 4 (Design and Contingencies - $75,000) 5 (2) SR 4009 AND SR 1001, BUSINESS PARK, <-- 6 BEDFORD TOWNSHIP, PAVEMENT 7 REHABILITATION AND SAFETY IMPROVEMENTS 500,000 8 (BASE PROJECT ALLOCATION - $360,000) 9 (LAND ALLOCATION - $80,000) 10 (DESIGN AND CONTINGENCIES - $60,000) 11 Section 306. Berks County. 12 (a) I-78 13 (1) Lebanon County Line to East of 14 Frystown, Rehabilitation and Safety 15 Improvements 13,395,000 16 (Base Project Allocation - $12,500,000) 17 (Land Allocation - $45,000) 18 (Design and Contingencies - $750,000) 19 (2) Hamburg to Lehigh County, Pavement, 20 Bridge Rehabilitation and Safety 21 Improvements 26,127,000 22 (Base Project Allocation - $25,477,000) 23 (Design and Contingencies - $650,000) 24 (b) SR 0183 25 (1) Interchange with SR 0222, Widen Bridge 26 and Reconstruct Interchange 14,500,000 27 (Base Project Allocation - $7,400,000) 28 (Land Allocation - $4,600,000) 29 (Design and Contingencies - $2,500,000) 30 (2) Intersection with SR 3055, Widen 19970S0185B2078 - 23 -
1 Bridge and Reconstruct Interchange 5,000,000 2 (Base Project Allocation - $3,500,000) 3 (Land Allocation - $750,000) 4 (Design and Contingencies - $750,000) 5 (c) US 222 6 (1) Reconstruct US 222 as a Four-Lane 7 Limited Access Highway Between SR 3028 8 (Warren Street Extension) in Cumru 9 Township and the Existing US 222 10 Expressway in Lancaster County 90,200,000 11 (Base Project Allocation - $66,000,000) 12 (Land Allocation - $17,200,000) 13 (Design and Contingencies - $7,000,000) 14 (2) Intersection with SR 0073, 15 Intersection Improvements 903,000 16 (Base Project Allocation - $628,000) 17 (Land Allocation - $175,000) 18 (Design and Contingencies - $100,000) 19 (3) Intersection with SR 0662, 20 Intersection Improvements 551,000 21 (Base Project Allocation - $445,000) 22 (Land Allocation - $51,000) 23 (Design and Contingencies - $55,000) 24 (4) MILLING AND RESURFACING, PAVEMENT <-- 25 RESTORATION 600,000 26 (BASE PROJECT ALLOCATION - $500,000) 27 (DESIGN AND CONTINGENCIES - $100,000) 28 (d) SR 0061 29 (1) SR 3055 to Schuylkill County Line, Add 30 Lanes, Resurface and Shoulder 19970S0185B2078 - 24 -
1 Construction 20,000,000 2 (2) SR 3055 to US 222, Widen Highway, 3 Abolish Existing Railroad Overpass and 4 Construct New Overpass 20,000,000 5 (3) HIGHWAY TRANSPORTATION STUDY FOR ROUTE <-- 6 61 IN MUHLENBERG TOWNSHIP 400,000 7 (DESIGN AND CONTINGENCIES - $400,000) 8 (e) SR 2033 9 (1) Shelbourne Road TR 422 and TR 562, 10 Realignment 6,525,000 11 (Base Project Allocation - $5,375,000) 12 (Land Allocation - $400,000) 13 (Design and Contingencies - $750,000) 14 (f) SR 3055 15 (1) Outer Bypass Rehabilitation, SR 0061 16 to the End of Expressway, 17 Rehabilitation 4,400,000 18 (Base Project Allocation - $2,400,000) 19 (Land Allocation - $1,000,000) 20 (Design and Contingencies - $1,000,000) 21 (2) MUHLENBERG TOWNSHIP, PAVEMENT <-- 22 RESTORATION 2,825,000 23 (BASE PROJECT ALLOCATION - $2,750,000) 24 (DESIGN AND CONTINGENCIES - $75,000) 25 (g) SR 0737 26 (1) Widen and Reconstruct Between SR 0222 27 and I-78 3,000,000 28 (h) Warren Street Extension 29 (1) Construct a New Four-Lane Limited 30 Access Highway Connecting US 422 in the 19970S0185B2078 - 25 -
1 Borough of Wyomissing to US 222 in 2 Cumru Township. The Proposed Highway 3 would have Interchanges with US 422, PA 4 724 and US 222 72,500,000 5 (Base Project Allocation - $45,500,000) 6 (Land Allocation - $18,800,000) 7 (Design and Contingencies - $8,200,000) 8 (i) SR 422 9 (1) Intersection with TR 662, Douglass 10 Township, Relocation and Reconstruction 11 of Intersection 5,000,000 12 (2) READING TO CHESTER COUNTY LINE, <-- 13 PAVEMENT REHABILITATION AND SAFETY 14 IMPROVEMENTS 1,200,000 15 (BASE PROJECT ALLOCATION - $1,000,000) 16 (DESIGN AND CONTINGENCIES - $200,000) 17 (3) DOUGLASSVILLE AREA, MILL, RESURFACE 18 AND PAVEMENT RESTORATION 983,000 19 (BASE PROJECT ALLOCATION - $958,000) 20 (DESIGN AND CONTINGENCIES - $25,000) 21 (j) Kutztown University 22 (1) Construction of New Access Road to 23 Kutztown University and Relocation of 24 State Road 2,760,000 25 (K) I-176 <-- 26 (1) CUMRU TOWNSHIP, PAVEMENT RESTORATION 1,200,000 27 (BASE PROJECT ALLOCATION - $1,100,000) 28 (DESIGN AND CONTINGENCIES - $100,000) 29 (L) SR 3040 30 (1) PARK ROAD 3 ROUTES LINKED TO PARK 19970S0185B2078 - 26 -
1 ROAD, MISCELLANEOUS IMPROVEMENTS AND 2 RESIGNING AS NECESSARY 750,000 3 (BASE PROJECT ALLOCATION - $700,000) 4 (DESIGN AND CONTINGENCIES - $50,000) 5 Section 307. Blair County. 6 (a) I-99 7 (1) Bedford County Line North to the 8 Village of Bald Eagle, Roadway 9 Rehabilitation and Safety Improvements 1,440,000 10 (Base Project Allocation - $1,320,000) 11 (Land Allocation - $60,000) 12 (Design and Contingencies - $60,000) 13 (2) Construction of New Interchange with 14 US 220 at Kettle Street to Juniata Gap 15 Road at Chestnut Avenue 90,000,000 16 (Base Project Allocation - $79,000,000) 17 (Land Allocation - $1,000,000) 18 (Design and Contingencies - 19 $10,000,000) 20 (3) TYRONE BYPASS, RESTORATION 10,000,000 <-- 21 (BASE PROJECT ALLOCATION - $9,000,000) 22 (DESIGN AND CONTINGENCIES - $1,000,000) 23 (b) SR 4027 24 (1) Reconstruction and/or Relocation in 25 Tyrone Borough and Snyder Township 3,200,000 26 (Base Project Allocation - $2,500,000) 27 (Land Allocation - $200,000) 28 (Design and Contingencies - $500,000) 29 (c) SR 4008 30 (1) Reconstruction of Horseshoe Curve Road 19970S0185B2078 - 27 -
1 from 40th Street and Board Avenue to US 2 22 at Gallitzin Interchange in Cambria 3 County 4,901,000 4 (Base Project Allocation - $4,198,000) 5 (Land Allocation - $350,000) 6 (Design and Contingencies - $353,000) 7 (d) Chestnut Avenue Extension 8 (1) Complete Construction of Chestnut 9 Avenue Extension 27,000,000 10 (Base Project Allocation - $17,000,000) 11 (Land Allocation - $5,000,000) 12 (Design and Contingencies - $5,000,000) 13 (E) US 22 <-- 14 (1) FRANKSTOWN TO YELLOW SPRING, PAVEMENT 15 REHABILITATION AND SAFETY IMPROVEMENTS 1,040,000 16 (BASE PROJECT ALLOCATION - $1,000,000) 17 (LAND ALLOCATION - $20,000) 18 (DESIGN AND CONTINGENCIES - $20,000) 19 (F) SR 1001 20 (1) PLANK ROAD IMPROVEMENTS AT I-99, 21 CORRIDOR IMPROVEMENTS 2,400,000 22 (BASE PROJECT ALLOCATION - $2,000,000) 23 (LAND ALLOCATION - $200,000) 24 (DESIGN AND CONTINGENCIES - $200,000) 25 (G) PA 36 26 (1) CONVENTION CENTER CONNECTOR FROM SR 27 1001, CONSTRUCT NEW FOUR-LANE ROAD 800,000 28 (BASE PROJECT ALLOCATION - $600,000) 29 (LAND ALLOCATION - $100,000) 30 (DESIGN AND CONTINGENCIES - $100,000) 19970S0185B2078 - 28 -
1 (H) ALTOONA BALLPARK ACCESS 2 (1) LOGAN TOWNSHIP, INTERCHANGE AND 3 ROADWAY IMPROVEMENTS 1,250,000 4 (BASE PROJECT ALLOCATION - $1,080,000) 5 (LAND ALLOCATION - $20,000) 6 (DESIGN AND CONTINGENCIES - $150,000) 7 (I) ALTOONA CONVENTION CENTER ACCESS 8 (1) ALLEGHENY AND LOGAN TOWNSHIPS, ROADWAY 9 CONSTRUCTION AND RELATED IMPROVEMENTS 10,075,000 10 (BASE PROJECT ALLOCATION - $8,335,000) 11 (LAND ALLOCATION - $520,000) 12 (DESIGN AND CONTINGENCIES - $1,220,000) 13 (J) SR 1013 14 (1) IMPROVE THREE DRAINAGE STRUCTURES AT 15 SEG. 270 (2 LOCATIONS) AND SEG. 290 1,500,000 16 (BASE PROJECT ALLOCATION - $1,125,000) 17 (LAND ALLOCATION - $25,000) 18 (DESIGN AND CONTINGENCIES - $350,000) 19 Section 308. Bradford County. 20 (a) SR 14 21 (1) Canton Township, Intersection of PA 14 22 and SR 3012, Village of Grover, 0.5 23 Mile Reconstruction, Improve Horizontal 24 Alignment and Intersection 2,100,000 25 (Base Project Allocation - $1,800,000) 26 (Land Allocation - $100,000) 27 (Design and Contingencies - $200,000) 28 (2) GROVER CURVE, PAVEMENT REHABILITATION <-- 29 AND SAFETY IMPROVEMENTS 420,000 30 (BASE PROJECT ALLOCATION - $400,000) 19970S0185B2078 - 29 -
1 (DESIGN AND CONTINGENCIES - $20,000) 2 (B) US 220 3 (1) TOWANDA BYPASS, CONCRETE PAVEMENT 4 REHABILITATION 1,920,000 5 (BASE PROJECT ALLOCATION - $1,520,000) 6 (DESIGN AND CONTINGENCIES - $400,000) 7 (C) PA 549 8 (1) TIOGA COUNTY LINE TO PA 328, 9 RESTORATION 460,000 10 (BASE PROJECT ALLOCATION - $260,000) 11 (LAND ALLOCATION - $100,000) 12 (DESIGN AND CONTINGENCIES - $100,000) 13 Section 309. Bucks County. 14 (a) I-95 15 (1) Philadelphia County to New Jersey 16 State Line, Pavement Rehabilitation and 17 Safety Improvements 1,900,000 18 (Base Project Allocation - $1,700,000) 19 (Land Allocation - $10,000) 20 (Design and Contingencies - $190,000) 21 (2) STREET ROAD AND SR 413 RAMPS, PAVEMENT <-- 22 REHABILITATION AND SAFETY IMPROVEMENTS 3,000,000 23 (BASE PROJECT ALLOCATION - $2,550,000) 24 (DESIGN AND CONTINGENCIES - $450,000) 25 (b) SR 309 26 (1) County Line Road, Hilltown Township to 27 Bethlehem Road, West Rockhill Township, 28 Pavement Rehabilitation, Shoulders and 29 Safety Improvements 2,000,000 30 (Base Project Allocation - $1,500,000) 19970S0185B2078 - 30 -
1 (Land Allocation - $150,000) 2 (Design and Contingencies - $350,000) 3 (2) SR 313 AND SR 663, INTERCHANGE TO <-- 4 LEHIGH COUNTY, ADD LANE 239,000 5 (BASE PROJECT ALLOCATION - $216,000) 6 (LAND ALLOCATION - $3,000) 7 (DESIGN AND CONTINGENCIES - $20,000) 8 (3) SELLERSVILLE BYPASS, CHURCH ROAD TO 9 RICH HILL ROAD, PAVEMENT REHABILITATION 10 AND SAFETY IMPROVEMENTS 1,180,000 11 (BASE PROJECT ALLOCATION - $980,000) 12 (DESIGN AND CONTINGENCIES - $200,000) 13 (c) SR 313 14 (1) New Galena Road, New Britain Township 15 to Stump Road, New Britain Township, 16 Install Truck Climbing Lane in 17 Westbound Direction 750,000 18 (Base Project Allocation - $500,000) 19 (Land Allocation - $150,000) 20 (Design and Contingencies - $100,000) 21 (d) SR 332 22 (1) Newtown and Lower Makefield Townships, 23 at Lindenhurst Road, SR 2069, Widening, 24 Intersection Improvements and Highway 25 Restoration 1,000,000 26 (Base Project Allocation - $1,000,000) 27 (2) SR 332 AND I-95 INTERCHANGE, <-- 28 INTERSECTION AND SAFETY IMPROVEMENTS 5,000,000 29 (BASE PROJECT ALLOCATION - $4,500,000) 30 (LAND ALLOCATION - $200,000) 19970S0185B2078 - 31 -
1 (DESIGN AND CONTINGENCIES - $300,000) 2 (E) SR 2025 3 (1) BRISTOL ROAD, NESHAMINY BOULEVARD TO 4 BROWNSTOWN PIKE, PAVEMENT 5 REHABILITATION AND SAFETY IMPROVEMENTS 585,000 6 (BASE PROJECT ALLOCATION - $240,000) 7 (LAND ALLOCATION - $45,000) 8 (DESIGN AND CONTINGENCIES - $300,000) 9 (F) PA 413 10 (1) WINCHESTER AVENUE TO NEWTOWN BYPASS, 11 PAVEMENT REHABILITATION AND SAFETY 12 IMPROVEMENTS 508,000 13 (BASE PROJECT ALLOCATION - $320,000) 14 (DESIGN AND CONTINGENCIES - $188,000) 15 (2) LOWER ROADWAY OF SR 413 BENEATH AMTRAK 16 BRIDGE AT INTERSECTION WITH SR 13 2,200,000 17 (BASE PROJECT ALLOCATION - $2,000,000) 18 (DESIGN AND CONTINGENCIES - $200,000) 19 (G) PA 611 20 (1) DOYLESTOWN BYPASS, EASTON ROAD TO 21 FERRY ROAD, PAVEMENT REHABILITATION AND 22 SAFETY IMPROVEMENTS 680,000 23 (BASE PROJECT ALLOCATION - $480,000) 24 (DESIGN AND CONTINGENCIES - $200,000) 25 (H) US 13 26 (1) BRISTOL PIKE, MORRISVILLE ROAD, FALLS 27 TOWNSHIP, RESTORATION, PAVEMENT 28 REHABILITATION AND SAFETY IMPROVEMENTS 5,100,000 29 (BASE PROJECT ALLOCATION - $4,500,000) 30 (DESIGN AND CONTINGENCIES - $600,000) 19970S0185B2078 - 32 -
1 (2) INTERCHANGE WITH PENNSYLVANIA 2 TURNPIKE, INTERCHANGE IMPROVEMENTS 1,000,000 3 (BASE PROJECT ALLOCATION - $800,000) 4 (LAND ALLOCATION - $100,000) 5 (DESIGN AND CONTINGENCIES - $100,000) 6 (I) US 202 7 (1) DOYLESTOWN TO MONTGOMERYVILLE, FOUR- 8 LANE DIVIDED RELOCATION 67,040,000 9 (BASE PROJECT ALLOCATION - $28,000,000) 10 (LAND ALLOCATION - $33,000,000) 11 (DESIGN AND CONTINGENCIES - $6,040,000) 12 (2) OFF-SITE IMPROVEMENTS, WARRINGTON AND 13 DOYLESTOWN 1,000,000 14 (BASE PROJECT ALLOCATION - $800,000) 15 (LAND ALLOCATION - $120,000) 16 (DESIGN AND CONTINGENCIES - $80,000) 17 (3) BUCKS AND MONTGOMERY COUNTIES, FOUR- 18 LANE DIVIDED RELOCATION 6,000,000 19 (BASE PROJECT ALLOCATION - $4,000,000) 20 (LAND ALLOCATION - $1,400,000) 21 (DESIGN AND CONTINGENCIES - $600,000) 22 (J) SR 2029 23 (1) FALLS TOWNSHIP AND MIDDLETOWN 24 TOWNSHIP, INTERSECTION IMPROVEMENTS AND 25 ROADWAY REALIGNMENT 1,000,000 26 (BASE PROJECT ALLOCATION - $760,000) 27 (LAND ALLOCATION - $200,000) 28 (DESIGN AND CONTINGENCIES - $40,000) 29 Section 310. Butler County. 30 (a) US 422 19970S0185B2078 - 33 -
1 (1) Intersection Improvements and 2 Installation of New Traffic Signals at 3 Intersection of US 422, SR 0038 and SR 4 0068 8,000,000 5 (2) Restoration of US 422 in Muddycreek 6 and Franklin Townships 10,100,000 7 (Base Project Allocation - $10,000,000) 8 (Design and Contingencies - $100,000) 9 (3) BUTLER BYPASS, PAVEMENT REHABILITATION <-- 10 AND SAFETY IMPROVEMENTS 1,020,000 11 (BASE PROJECT ALLOCATION - $1,000,000) 12 (DESIGN AND CONTINGENCIES - $20,000) 13 (4) LAWRENCE COUNTY LINE TO ARMSTRONG 14 COUNTY LINE, PAVEMENT REHABILITATION 15 AND SAFETY IMPROVEMENTS 220,000 16 (BASE PROJECT ALLOCATION - $200,000) 17 (DESIGN AND CONTINGENCIES - $20,000) 18 (5) MOUNT CHESTNUT TO PA 528, PAVEMENT 19 REHABILITATION AND SAFETY IMPROVEMENTS 420,000 20 (BASE PROJECT ALLOCATION - $400,000) 21 (DESIGN AND CONTINGENCIES - $20,000) 22 (6) SOUTH FROM PA 28 TO SR 2006, PAVEMENT 23 RESTORATION 6,400,000 24 (BASE PROJECT ALLOCATION - $6,300,000) 25 (DESIGN AND CONTINGENCIES - $100,000) 26 (b) Hansen Avenue 27 (1) Installation of New Traffic Signals at 28 Hansen Avenue in Butler Township 160,000 29 (c) SR 0068 30 (1) Installation of Traffic Signals at 19970S0185B2078 - 34 -
1 Intersection with Whitestown Road 50,000 2 (2) Installation of Traffic Signals at 3 Intersection with Stevenson Road 50,000 4 (d) SR 0356 5 (1) Widen SR 0356 from Silverville Road to 6 Riemer Road 5,000,000 7 (e) SR 0228 8 (1) Installation of Traffic Signals at 9 Intersection with South Pike Road 200,000 10 (2) Restoration, Reconstruction and 11 Widening of SR 228 from SR 3015 to SR 8 12 South 9,700,000 13 (Base Project Allocation - $8,000,000) 14 (Land Allocation - $1,000,000) 15 (Design and Contingencies - $700,000) 16 (3) Restoration, Reconstruction and 17 Widening of SR 228 from SR 8 South to 18 SR 356 21,500,000 19 (Base Project Allocation - $18,000,000) 20 (Land Allocation - $2,000,000) 21 (Design and Contingencies - $1,500,000) 22 (f) South Pike Road 23 (1) Installation of Traffic Signals at 24 Intersection with Monroe Road 200,000 25 (g) SR 528 26 (1) Reconstruction of Existing Interchange 27 in Jackson Township 1,900,000 28 (Base Project Allocation - $1,400,000) 29 (Land Allocation - $200,000) 30 (Design and Contingencies - $300,000) 19970S0185B2078 - 35 -
1 (h) SR 3025 2 (1) Reconstruction of Existing Interchange 3 in Jackson Township 4,100,000 4 (Base Project Allocation - $3,500,000) 5 (Land Allocation - $300,000) 6 (Design and Contingencies - $300,000) 7 (i) SR 8 8 (1) Restoration and Reconstruction of SR 8 9 South in City of Butler and Butler, 10 Penn and Middlesex Townships 16,700,000 11 (Base Project Allocation - $15,000,000) 12 (Land Allocation - $1,000,000) 13 (Design and Contingencies - $700,000) 14 (J) PA 28 <-- 15 (1) FREEPORT NORTH FROM ALLEGHENY COUNTY 16 LINE TO T-300, PAVEMENT RESTORATION 5,500,000 17 (BASE PROJECT ALLOCATION - $5,400,000) 18 (DESIGN AND CONTINGENCIES - $100,000) 19 (2) BUTLER AND ARMSTRONG COUNTIES FROM 20 ALLEGHENY COUNTY LINE TO KITTANNING, 21 PAVEMENT REHABILITATION AND SAFETY 22 IMPROVEMENTS 1,200,000 23 (BASE PROJECT ALLOCATION - $1,000,000) 24 (DESIGN AND CONTINGENCIES - $200,000) 25 Section 311. Cambria County. 26 (a) US 219 27 (1) Scalp Avenue to Davidsville, Pavement 28 Restoration 1,392,000 29 (Base Project Allocation - $1,312,000) 30 (Design and Contingencies - $80,000) 19970S0185B2078 - 36 -
1 (2) AIRPORT INTELLIGENT TRANSPORTATION <-- 2 SYSTEMS TO SIDMAN INTERCHANGE, PAVEMENT 3 RESTORATION 2,100,000 4 (BASE PROJECT ALLOCATION - $2,000,000) 5 (DESIGN AND CONTINGENCIES - $100,000) 6 (3) CARROLLTOWN TO DUBOIS, PRELIMINARY 7 ENGINEERING STUDY 120,000 8 (DESIGN AND CONTINGENCIES - $120,000) 9 (4) CHICKORY MOUNTAIN, PRECONSTRUCTION 10 PHASES 1,120,000 11 (LAND ALLOCATION - $480,000) 12 (DESIGN AND CONTINGENCIES - $640,000) 13 (b) SR 4021 14 (1) Construct Access Road from SR 4021 to 15 Hastings Area Industrial Park 1,300,000 16 (c) PA 56 17 (1) Haws Pike, Lower Yoder Township 18 Roadway Rehabilitation and Safety 19 Improvements 400,000 20 (Base Project Allocation - $380,000) 21 (Design and Contingencies - $20,000) 22 (2) PA 56 AT SR 3033, RICHLAND TOWNSHIP, <-- 23 PA 56 DETOUR BRIDGE REPLACEMENT 70,000 24 (BASE PROJECT ALLOCATION - $50,000) 25 (LAND ALLOCATION - $3,000) 26 (DESIGN AND CONTINGENCIES - $17,000) 27 (3) US 219 INTERCHANGE TO WIDMAN STREET, 28 PAVEMENT RESTORATION 960,000 29 (BASE PROJECT ALLOCATION - $760,000) 30 (DESIGN AND CONTINGENCIES - $200,000) 19970S0185B2078 - 37 -
1 (4) PA 56 AND PA 403, ROOSEVELT BOULEVARD 2 TO WESTMORELAND COUNTY LINE, RELOCATION 3 AND RECONSTRUCTION 13,600,000 4 (BASE PROJECT ALLOCATION - $10,000,000) 5 (LAND ALLOCATION - $1,600,000) 6 (DESIGN AND CONTINGENCIES - $2,000,000) 7 (D) PA 271 8 (1) PERGRIM HILL, RECONSTRUCT AND WIDEN 700,000 9 (BASE PROJECT ALLOCATION - $480,000) 10 (LAND ALLOCATION - $140,000) 11 (DESIGN AND CONTINGENCIES - $80,000) 12 (E) ST. FRANCIS COLLEGE <-- 13 (1) IMPROVEMENTS TO ACCESS ROADS AND 14 PARKING FACILITIES IN AND AROUND ST. 15 FRANCIS COLLEGE 500,000 16 (BASE PROJECT ALLOCATION - $400,000) 17 (LAND ALLOCATION - $50,000) 18 (DESIGN AND CONTINGENCIES - $50,000) 19 Section 312. Cameron County (Reserved). 20 Section 313. Carbon County. 21 (a) I-80 22 (1) Harmony Lake to Monroe County, 23 Pavement Rehabilitation and Safety 24 Improvements 200,000 25 (Base Project Allocation - $179,000) 26 (Land Allocation - $1,000) 27 (Design and Contingencies - $20,000) 28 (2) Reconstruction of Rest Area on 29 Westbound I-80 in Kidder Township 4,950,000 30 (Base Project Allocation - $2,700,000) 19970S0185B2078 - 38 -
1 (Land Allocation - $1,000,000) 2 (Design and Contingencies - $1,250,000) 3 (3) Construct New Weigh Station at Rest 4 Area on Westbound I-80 in Kidder 5 Township 330,000 6 (Base Project Allocation - $300,000) 7 (Design and Contingencies - $30,000) 8 (b) SR 248 9 (1) Rehabilitation and Restoration of SR 10 248 from US 209 to Palmerton Borough 1,900,000 11 (Base Project Allocation - $1,900,000) 12 (2) Rehabilitation and Restoration of SR 13 248 from SR 895 to Northampton County 14 line 2,300,000 15 (Base Project Allocation - $2,200,000) 16 (Land Allocation - $50,000) 17 (Design and Contingencies - $50,000) 18 (c) SR 2006 19 (1) Intersection Improvements at 20 Intersection of SR 2006 and SR 2002 in 21 Lower Towamensing Township 1,150,000 22 (Base Project Allocation - $850,000) 23 (Land Allocation - $150,000) 24 (Design and Contingencies - $150,000) 25 (d) SR 2015 26 (1) Restoration of SR 2015 in Borough of 27 Weissport 800,000 28 (Base Project Allocation - $400,000) 29 (Land Allocation - $100,000) 30 (Design and Contingencies - $300,000) 19970S0185B2078 - 39 -
1 (E) SR 209 <-- 2 (1) RECONSTRUCTION OF INTERSECTION OF SR 3 209 AND SR 248, INCLUDING SAFETY 4 IMPROVEMENTS AND INSTALLATION OF 5 TRAFFIC SIGNALS 475,000 6 (BASE PROJECT ALLOCATION - $350,000) 7 (DESIGN AND CONTINGENCIES - $125,000) 8 (2) SAFETY IMPROVEMENTS, INCLUDING 9 RECONSTRUCTION OF INTERSECTION OF SR 10 209 AND BROADWAY, JIM THORPE BOROUGH, 11 INCLUDING CONSTRUCTION OF TURNING 12 LANES, IMPROVED PEDESTRIAN AND TRAFFIC 13 SIGNALIZATION AND CONSTRUCTION OF 14 HANDICAPPED CURB CUTS 1,150,000 15 (BASE PROJECT ALLOCATION - $950,000) 16 (DESIGN AND CONTINGENCIES - $200,000) 17 (F) SR 443 18 (1) RECONSTRUCTION OF INTERSECTION OF SR 19 443 AND SR 902, INCLUDING SAFETY 20 IMPROVEMENTS, INSTALLATION OF TRAFFIC 21 SIGNALS AND CONSTRUCTION OF A PASSING 22 LANE 575,000 23 (BASE PROJECT ALLOCATION - $450,000) 24 (DESIGN AND CONTINGENCIES - $125,000) 25 Section 314. Centre County. 26 (a) I-80 27 (1) Clearfield County Line to Clinton 28 County, Pavement Rehabilitation and 29 Safety Improvements 3,300,000 30 (Base Project Allocation - $2,953,000) 19970S0185B2078 - 40 -
1 (Land Allocation - $17,000) 2 (Design and Contingencies - $330,000) 3 (2) Marion Township, Exit 24, Interchange 4 Reconstruction 1,560,000 5 (Base Project Allocation - $1,500,000) 6 (Design and Contingencies - $60,000) 7 (3) Boggs Township, Exit 23, Interchange 8 Reconstruction 1,160,000 9 (Base Project Allocation - $1,100,000) 10 (Design and Contingencies - $60,000) 11 (4) MILE POST 117 TO MILE POST 140, <-- 12 CROSSOVERS AND PAVEMENT RESTORATION 3,600,000 13 (BASE PROJECT ALLOCATION - $3,500,000) 14 (DESIGN AND CONTINGENCIES - $100,000) 15 (b) PA 504 16 (1) Phillipsburg Borough and Rush 17 Township, Cold Stream Run Bridge to 18 Airport, Two-Lane Reconstruction 400,000 19 (Base Project Allocation - $240,000) 20 (Land Allocation - $60,000) 21 (Design and Contingencies - $100,000) 22 (c) PA 350 23 (1) Climbing Lane and Two-Lane Relocation, 24 North of Bald Eagle to Top of Sandy 25 Ridge Mountain 5,750,000 26 (Base Project Allocation - $5,200,000) 27 (Land Allocation - $150,000) 28 (Design and Contingencies - $400,000) 29 (2) SAFETY IMPROVEMENTS ALONG SR 350 500,000 <-- 30 (3) PA 350 TO US 322, PRELIMINARY 19970S0185B2078 - 41 -
1 ENGINEERING STUDY 100,000 2 (DESIGN AND CONTINGENCIES - $100,000) 3 (4) SAFETY IMPROVEMENTS, OVER VERTICAL 4 CORRECTION AND TURNING LANES AT VARIOUS 5 LOCATIONS 2,175,000 6 (BASE PROJECT ALLOCATION - $2,000,000) 7 (LAND ALLOCATION - $100,000) 8 (DESIGN AND CONTINGENCIES - $75,000) 9 (D) SNOWSHOE TOWNSHIP 10 (1) INTELLIGENT TRANSPORTATION SYSTEMS 740,000 11 (BASE PROJECT ALLOCATION - $690,000) 12 (DESIGN AND CONTINGENCIES - $50,000) 13 (E) SR 0026 14 (1) LOGAN BRIDGE TO BELLEFONTE BYPASS, 15 FOUR-LANE RELOCATION 8,640,000 16 (BASE PROJECT ALLOCATION - $8,640,000) 17 (2) HUNTINGDON COUNTY LINE TO STATE 18 COLLEGE, RECONSTRUCTION AND SAFETY 19 IMPROVEMENTS 250,000 20 (BASE PROJECT ALLOCATION - $200,000) 21 (LAND ALLOCATION - $25,000) 22 (DESIGN AND CONTINGENCIES - $25,000) 23 (F) US 220 24 (1) RECONSTRUCTION AND RELOCATION BETWEEN 25 US 322 AND I-80 15,000,000 26 (BASE PROJECT ALLOCATION - $14,300,000) 27 (LAND ALLOCATION - $400,000) 28 (DESIGN AND CONTINGENCIES - $300,000) 29 (G) US 322 30 (1) PORT MATILDA TO PHILIPSBURG, PAVEMENT 19970S0185B2078 - 42 -
1 REHABILITATION AND SAFETY IMPROVEMENTS 1,400,000 2 (BASE PROJECT ALLOCATION - $1,200,000) 3 (DESIGN AND CONTINGENCIES - $200,000) 4 (2) STATE COLLEGE BYPASS, PAVEMENT 5 REHABILITATION AND SAFETY IMPROVEMENTS 1,400,000 6 (BASE PROJECT ALLOCATION - $1,200,000) 7 (DESIGN AND CONTINGENCIES - $200,000) 8 (3) CENTRE AND MIFFLIN COUNTIES, SEVEN 9 MOUNTAINS TO LEWISTOWN NARROWS, 10 PAVEMENT REHABILITATION AND SAFETY 11 IMPROVEMENTS 3,600,000 12 (BASE PROJECT ALLOCATION - $3,200,000) 13 (DESIGN AND CONTINGENCIES - $400,000) 14 (H) US 220 AND SR 0026 15 (1) SPRING CREEK TO LOGAN FOUR-LANE 16 RELOCATION 8,640,000 17 (BASE PROJECT ALLOCATION - $8,640,00) 18 (I) CLINTON AVENUE 19 (1) WEST COLLEGE AVENUE AND WEST CLINTON 20 AVENUE CONSTRUCT NEW THREE-LANE 21 ROADWAY 960,000 22 (BASE PROJECT ALLOCATION - $840,000) 23 (LAND ALLOCATION - $20,000) 24 (DESIGN AND CONTINGENCIES - $100,000) 25 (J) SR 2012 26 (1) RELOCATION OF SEGMENT 10/0000 OF SR 27 2012 BETWEEN SR 192 AND SEGMENT 20/0000 28 OF SR 2012 AND WIDEN ROADWAY AND 29 SHOULDERS TO 24 FEET 593,000 30 (BASE PROJECT ALLOCATION - $500,000) 19970S0185B2078 - 43 -
1 (DESIGN AND CONTINGENCIES - $93,000) 2 Section 315. Chester County. 3 (a) SR 41 4 (1) Relocation of SR 41 in Southern 5 Chester County 10,000,000 <-- 6 (Design and Contingencies - 7 $10,000,000) 8 CHESTER COUNTY BETWEEN DELAWARE STATE <-- 9 LINE AND SR 926 11,900,000 10 (DESIGN AND CONTINGENCIES - 11 $11,900,000) 12 (2) Upgrade Intersection of SR 41 and SR 13 796 in Londonderry Township 665,000 14 (Base Project Allocation - $600,000) 15 (Land Allocation - $15,000) 16 (Design and Contingencies - $50,000) 17 (3) Upgrade Intersection of SR 41 and Zook 18 Road in West Sadsbury Township 665,000 19 (Base Project Allocation - $600,000) 20 (Land Allocation - $15,000) 21 (Design and Contingencies - $50,000) 22 (b) US 1 23 (1) East Marlborough Township, 24 Transportation Partnership Overpass 3,000,000 25 (Base Project Allocation - $2,500,000) 26 (Land Allocation - $200,000) 27 (Design and Contingencies - $300,000) 28 (2) EAST MARLBOROUGH TOWNSHIP, WIDEN 548,000 <-- 29 (BASE PROJECT ALLOCATION - $500,000) 30 (LAND ALLOCATION - $48,000) 19970S0185B2078 - 44 -
1 (c) SR 926 2 (1) Resurface, Widen, Install New Drainage 3 and Improve Intersection Visibility 4 from Route 352 to Route 202 675,000 5 (Base Project Allocation - $325,000) 6 (Land Allocation - $125,000) 7 (Design and Contingencies - $225,000) 8 (d) US 202 9 (1) Signalization of Southbound US 202 10 Off-Ramp at Intersection with Paoli 11 Pike, West Goshen Township 335,000 12 (Base Project Allocation - $250,000) 13 (Design and Contingencies - $85,000) 14 (2) Engineering study of the capacity and 15 potential safety improvements to the 16 ramps, structures and roadway of US 202 17 between US 30 and Swedesford Road 18 interchange in East Whiteland 1,500,000 19 (Design and Contingencies - $1,500,000) 20 (3) US 30 TO MOREHALL ROAD, PAVEMENT <-- 21 REHABILITATION AND SAFETY IMPROVEMENTS 5,500,000 22 (BASE PROJECT ALLOCATION - $5,000,000) 23 (DESIGN AND CONTINGENCIES - $500,000) 24 (4) RAMPS AT INTERCHANGE WITH WESTTOWN 25 ROAD, WEST GOSHEN TOWNSHIP, TURNING 26 LANES AND SAFETY IMPROVEMENTS 111,000 27 (BASE PROJECT ALLOCATION - $101,000) 28 (LAND ALLOCATION - $2,000) 29 (DESIGN AND CONTINGENCIES - $8,000) 30 (e) Paoli Pike 19970S0185B2078 - 45 -
1 (1) Install New Storm Water Drainage 2 System at Two Locations on Paoli Pike 3 in Willistown Township 482,000 4 (Base Project Allocation - $450,000) 5 (Design and Contingencies - $32,000) 6 (f) US 30 7 (1) US 30, Coatesville-Downingtown Bypass, 8 Preliminary Engineering Analysis for 9 Update from SR 10 West of Coatesville 10 to Exton Bypass 1,000,000 <-- 11 TO EXTON BYPASS 3,800,000 <-- 12 (2) PA 340 TO BUSINESS 30, RESTORATION, 13 PAVEMENT REHABILITATION AND SAFETY 14 IMPROVEMENTS 1,600,000 15 (BASE PROJECT ALLOCATION - $1,000,000) 16 (DESIGN AND CONTINGENCIES - $600,000) 17 (G) PA 100 18 (1) PUGHTOWN ROAD INTERSECTION, 19 INTERSECTION IMPROVEMENTS 280,000 20 (BASE PROJECT ALLOCATION - $200,000) 21 (LAND ALLOCATION - $50,000) 22 (DESIGN AND CONTINGENCIES - $30,000) 23 (2) PRIZER ROAD TO PA 28 23, PAVEMENT <-- 24 REHABILITATION AND SAFETY IMPROVEMENTS 380,000 25 (BASE PROJECT ALLOCATION - $280,000) 26 (DESIGN AND CONTINGENCIES - $100,000) 27 (H) PA 003 28 (1) DELAWARE COUNTY LINE TO WEST CHESTER 29 BOROUGH, PAVEMENT REHABILITATION AND 30 SAFETY IMPROVEMENTS 1,480,000 19970S0185B2078 - 46 -
1 (BASE PROJECT ALLOCATION - $980,000)
2 (DESIGN AND CONTINGENCIES - $500,000)
3 (I) US 422
4 (1) BERKS COUNTY LINE TO MONTGOMERY COUNTY
5 LINE, PAVEMENT REHABILITATION AND
6 SAFETY IMPROVEMENTS 900,000
7 (BASE PROJECT ALLOCATION - $800,000)
8 (DESIGN AND CONTINGENCIES - $100,000)
9 (J) PA 113
10 (1) INTERSECTION WITH SR 0401,
11 CHANNELIZATION AND SIGNALIZATION 940,000
12 (BASE PROJECT ALLOCATION - $900,000)
13 (LAND ALLOCATION - $40,000)
14 (K) PA 52
15 (1) RELOCATION OF PA 52 SOUTH,
16 ENGINEERING 50,000
17 (DESIGN AND CONTINGENCIES - $50,000)
18 (L) SR 3048
19 (1) INTERSECTION OF MCFARLAND ROAD AND
20 EAST BALTIMORE PIKE, INTERSECTION
21 IMPROVEMENTS INCLUDING SIGNALS AND LEFT
22 TURN LANES 500,000
23 (BASE PROJECT ALLOCATION - $400,000)
24 (LAND ALLOCATION - $40,000)
25 (DESIGN AND CONTINGENCIES - $60,000)
26 Section 316. Clarion County (Reserved). <--
27 SECTION 316. CLARION COUNTY. <--
28 (A) I-80
29 (1) WILLIAMSBURG WEST FOR 5.2 MILES,
30 PAVEMENT REHABILITATION 1,400,000
19970S0185B2078 - 47 -
1 (BASE PROJECT ALLOCATION - $1,300,000) 2 (DESIGN AND CONTINGENCIES - $100,000) 3 (2) REHABILITATION OF EXITS 6 AND 7, 4 PAVEMENT REHABILITATION 1,400,000 5 (BASE PROJECT ALLOCATION - $1,300,000) 6 (DESIGN AND CONTINGENCIES - $100,000) 7 (3) STRATENVILLE REHABILITATION, PA 68 TO 8 US 322, PAVEMENT RESTORATION 5,600,000 9 (BASE PROJECT ALLOCATION - $5,500,000) 10 (DESIGN AND CONTINGENCIES - $100,000) 11 (4) CLARION AND JEFFERSON COUNTIES FROM 12 VENANGO COUNTY TO CLEARFIELD COUNTY, 13 PAVEMENT REHABILITATION, INTERCHANGE 14 RECONSTRUCTION AND SAFETY IMPROVEMENTS 1,100,000 15 (BASE PROJECT ALLOCATION - $1,000,000) 16 (DESIGN AND CONTINGENCIES - $100,000) 17 (B) PA 28 18 (1) NEW BETHLEHEM, PAVEMENT REHABILITATION 19 AND SAFETY IMPROVEMENTS 520,000 20 (BASE PROJECT ALLOCATION - $400,000) 21 (DESIGN AND CONTINGENCIES - $120,000) 22 (C) PA 66 23 (1) EXIT 8 ON I-80 TO TR 322, PAVEMENT 24 REHABILITATION AND SAFETY IMPROVEMENTS 620,000 25 (BASE PROJECT ALLOCATION - $600,000) 26 (DESIGN AND CONTINGENCIES - $20,000) 27 Section 317. Clearfield County. 28 (a) I-80 29 (1) Jefferson County Line to Centre County 30 Line, Pavement Rehabilitation and 19970S0185B2078 - 48 -
1 Safety Improvements 4,100,000 2 (Base Project Allocation - $3,670,000) 3 (Land Allocation - $20,000) 4 (Design and Contingencies - $410,000) 5 (2) WESTERN CLEARFIELD COUNTY, 23 MILES, <-- 6 PAVEMENT RESTORATION 3,100,000 7 (BASE PROJECT ALLOCATION - $3,000,000) 8 (DESIGN AND CONTINGENCIES - $100,000) 9 (b) US 219 10 (1) SR 219 and SR 4019, South of Dubois, 11 Add Two-Way Left Turn Lane 188,000 12 (Base Project Allocation - $138,000) 13 (Land Allocation - $30,000) 14 (Design and Contingencies - $20,000) 15 (2) EXIT 16 INTERCHANGE WITH PA 830, <-- 16 PAVEMENT RESTORATION 3,100,000 17 (BASE PROJECT ALLOCATION - $3,000,000) 18 (DESIGN AND CONTINGENCIES - $100,000) 19 (3) DUBOIS TO I-80, EXPAND TO FOUR LANES 340,000 20 (BASE PROJECT ALLOCATION - $240,000) 21 (LAND ALLOCATION - $40,000) 22 (DESIGN AND CONTINGENCIES - $60,000) 23 (4) JARED AND BRADY STREETS, RECONSTRUCT 24 TO ESTABLISH ONE-WAY SYSTEM 700,000 25 (BASE PROJECT ALLOCATION - $500,000) 26 (LAND ALLOCATION - $100,000) 27 (DESIGN AND CONTINGENCIES - $100,000) 28 (C) ROCKTON MOUNTAIN 29 (1) INTELLIGENT TRANSPORTATION SYSTEMS 740,000 30 (BASE PROJECT ALLOCATION - $690,000) 19970S0185B2078 - 49 -
1 (DESIGN AND CONTINGENCIES - $50,000) 2 (D) PA 153 <-- 3 (1) CROOKED SEWER ROAD, FROM RAMEY TO 4 HENDERSON, BIGLER TOWNSHIP, 5 CONSTRUCTION OF TWO-LANE RELOCATION 4,960,000 6 (BASE PROJECT ALLOCATION - $4,400,000) 7 (LAND ALLOCATION - $120,000) 8 (DESIGN AND CONTINGENCIES - $440,000) 9 (E) CLEARFIELD BOROUGH 10 (1) UPDATE SIGNALS AND EQUIPMENT IN 11 CLEARFIELD BOROUGH 120,000 12 (BASE PROJECT ALLOCATION - $60,000) 13 (DESIGN AND CONTINGENCIES - $60,000) 14 (F) US 220 15 (1) RECONSTRUCTION OF US 220 FROM US 322 16 TO I-80, MARTHA FURNACE TO MILESBURG 17 INTERCHANGE 4,080,000 <-- 18 INTERCHANGE 4,880,000 <-- 19 (Base Project Allocation - $3,800,000) 20 (Land Allocation - $80,000) 21 (Design and Contingencies - $1,000,000) 22 (g) SR 350 23 (1) Bypass of Philipsburg, Relocation of 2 24 Lanes and Construction of Climbing 25 Lane 2,350,000 26 (Base Project Allocation - $2,225,000) 27 (Land Allocation - $50,000) 28 (Design and Contingencies - $75,000) 29 Section 318. Clinton County. 30 (a) I-80 19970S0185B2078 - 50 -
1 (1) Centre County Line to Union County 2 Line, Pavement Rehabilitation and 3 Safety Improvements 2,400,000 4 (Base Project Allocation - $2,148,000) 5 (Land Allocation - $12,000) 6 (Design and Contingencies - $240,000) 7 (2) INTELLIGENT TRANSPORTATION SYSTEMS, <-- 8 VARIABLE MESSAGE SIGN AND WEATHER 9 STATION 500,000 10 (BASE PROJECT ALLOCATION - $500,000) 11 Section 319. Columbia County. 12 (a) PA 54 13 (1) PA 54/61 and PA 42, Village of 14 Centralia, Restoration 150,000 15 (Base Project Allocation - $120,000) 16 (Land Allocation - $6,000) 17 (Design and Contingencies - $24,000) 18 (b) PA 487 19 (1) Knoebels Access Road, Franklin 20 Township, Intersection and Access 21 Improvements 300,000 22 (Base Project Allocation - $180,000) 23 (Land Allocation - $20,000) 24 (Design and Contingencies - $100,000) 25 (C) I-80 <-- 26 (1) EXIT 34, BUCKHORN INTERCHANGE, 27 PAVEMENT REHABILITATION AND SAFETY 28 IMPROVEMENTS 620,000 29 (BASE PROJECT ALLOCATION - $600,000) 30 (LAND ALLOCATION - $5,000) 19970S0185B2078 - 51 -
1 (DESIGN AND CONTINGENCIES - $15,000) 2 (2) LIME RIDGE INTERCHANGE, PAVEMENT 3 RESTORATION 500,000 4 (BASE PROJECT ALLOCATION - $450,000) 5 (DESIGN AND CONTINGENCIES - $50,000) 6 (D) SR 11 <-- 7 (1) US 11 AND PA 42, TOWN OF BLOOMSBURG, 8 INTERCHANGE ADJUSTMENTS, ACCESS 9 IMPROVEMENTS, AND SR 4003 BRIDGE 10 REMOVAL COORDINATED WITH RIVER LEVEE 11 CONSTRUCTION 2,500,000 12 (BASE PROJECT ALLOCATION - $2,000,000) 13 (DESIGN AND CONTINGENCIES - $500,000) 14 Section 320. Crawford County. 15 (a) I-79 16 (1) Northbound and Southbound Rest Areas 17 (Sites 19 and 20), Sewage Treatment 18 Plant Improvements, Length 0.5 Mile 1,150,000 19 (Base Project Allocation - $1,000,000) 20 (Design and Contingencies - $150,000) 21 (2) MERCER COUNTY LINE TO ERIE COUNTY <-- 22 LINE, PAVEMENT REHABILITATION AND 23 SAFETY IMPROVEMENTS 3,100,000 24 (BASE PROJECT ALLOCATION - $3,000,000) 25 (DESIGN AND CONTINGENCIES - $100,000) 26 (b) SR 8 27 (1) Intersection Improvements at SR 8 and 28 SR 27 to Provide Additional Truck 29 Turning Radii 205,000 30 (Base Project Allocation - $160,000) 19970S0185B2078 - 52 -
1 (Land Allocation - $10,000) 2 (Design and Contingencies - $35,000) 3 (2) PA 8 AND PA 408, ADD LANES AND <-- 4 INTERSECTION IMPROVEMENTS 325,000 5 (BASE PROJECT ALLOCATION - $265,000) 6 (LAND ALLOCATION - $40,000) 7 (DESIGN AND CONTINGENCIES - $20,000) 8 (c) SR 27 9 (1) Install New Signals at Intersections 10 within City of Meadville 275,000 11 (Base Project Allocation - $225,000) 12 (Land Allocation - $20,000) 13 (Design and Contingencies - $30,000) 14 (2) Various Corridor and Spot Improvements 15 on SR 27 between Meadville and 16 Titusville 7,000,000 17 (Base Construction Allocation - 18 $6,000,000) 19 (Land Allocation - $400,000) 20 (Design and Contingencies - $600,000) 21 (d) SR 77 22 (1) Various Corridor and Spot Improvements 23 on SR 77, SR 408 and SR 1010 between 24 Meadville and Titusville 7,000,000 25 (Base Construction Allocation - $ 26 6,000,000) 27 (Land Allocation - $400,000) 28 (Design and Contingencies - $600,000) 29 (E) PA 198 <-- 30 (1) SAEGERTOWN ROAD, INTERSECTION 19970S0185B2078 - 53 -
1 IMPROVEMENT 106,000 2 (BASE PROJECT ALLOCATION - $100,000) 3 (DESIGN AND CONTINGENCIES - $6,000) 4 Section 321. Cumberland County. 5 (a) I-81 6 (1) Exit 12, Interchange with PA 465, 7 Interchange Improvements 1,520,000 8 (Base Construction Allocation - 9 $1,200,000) 10 (Land Allocation - $20,000) 11 (Design and Contingencies - $300,000) 12 (2) FRANKLIN COUNTY LINE TO STOUGHSTOWN, <-- 13 PAVEMENT REHABILITATION AND SAFETY 14 IMPROVEMENTS 1,210,000 15 (BASE PROJECT ALLOCATION - $1,000,000) 16 (LAND ALLOCATION - $10,000) 17 (DESIGN AND CONTINGENCIES - $200,000) 18 (3) CUMBERLAND WEST, RESURFACING PAVEMENT, 19 REHABILITATION AND SAFETY IMPROVEMENTS 9,790,000 20 (BASE PROJECT ALLOCATION - $9,480,000) 21 (LAND ALLOCATION - $10,000) 22 (DESIGN AND CONTINGENCIES - $300,000) 23 (4) HAMPTON EAST PM, PA 114 TO GEORGE WADE 24 BRIDGE, PAVEMENT REHABILITATION AND 25 SAFETY IMPROVEMENTS 1,388,000 26 (BASE PROJECT ALLOCATION - $1,358,000) 27 (DESIGN AND CONTINGENCIES - $30,000) 28 (5) US 11 TO PA 114, PAVEMENT RESTORATION 7,810,000 29 (BASE PROJECT ALLOCATION - $7,540,000) 30 (DESIGN AND CONTINGENCIES - $270,000) 19970S0185B2078 - 54 -
1 (6) INTERCHANGE WITH PA 944, TRANSPORTATION <-- 2 IMPROVEMENTS AROUND INTERCHANGE 500,000 3 (BASE PROJECT ALLOCATION - $400,000) 4 (LAND ALLOCATION - $50,000) 5 (DESIGN AND CONTINGENCIES - $50,000) 6 (B) I-83 7 (1) INTERCHANGE WITH PA 581 AND PA 114 8 EXIT 18 TO SUSQUEHANNA RIVER, 9 INTERCHANGE DESIGN ALTERNATIVE 90,000 10 (DESIGN AND CONTINGENCIES - $90,000) 11 (C) US 15 12 (1) PA 581 TO DILLSBURG, PAVEMENT 13 RESTORATION 8,100,000 14 (BASE PROJECT ALLOCATION - $8,000,000) 15 (DESIGN AND CONTINGENCIES - $100,000) 16 (2) US 11, RANGE ROAD TO CUMBERLAND COUNTY 17 LINE, PAVEMENT RESTORATION AND SAFETY 18 IMPROVEMENTS 1,310,000 19 (BASE PROJECT ALLOCATION - $1,000,000) 20 (LAND ALLOCATION - $10,000) 21 (DESIGN AND CONTINGENCIES - $300,000) 22 (D) PA 114 23 (1) I-81 TO US 11, SILVER SPRING TOWNSHIP, 24 PAVEMENT RESTORATION AND SAFETY 25 IMPROVEMENTS 720,000 26 (BASE PROJECT ALLOCATION - $460,000) 27 (LAND ALLOCATION - $10,000) 28 (DESIGN AND CONTINGENCIES - $250,000) 29 (E) SR 581 30 (1) INSTALLATION OF NOISE BARRIERS ON SR 19970S0185B2078 - 55 -
1 581 FROM I-83 INTERSECTION TO SPORTING 2 HILL 21,000,000 3 (BASE PROJECT ALLOCATION - $18,000,000) 4 (LAND ALLOCATION - $1,500,000) 5 (DESIGN AND CONTINGENCIES - $1,500,000) 6 (F) SR 1015 7 (1) 21ST STREET TO PA 944, RELOCATION, 8 WIDENING AND RECONSTRUCTION 391,000 9 (BASE PROJECT ALLOCATION - $391,000) 10 Section 322. Dauphin County. 11 (a) I-283 12 (1) PA 441 to I-76, Pavement 13 Rehabilitation and Safety Improvements 200,000 14 (Base Project Allocation - $179,000) 15 (Land Allocation - $1,000) 16 (Design and Contingencies - $20,000) 17 (2) PA 283 TO I-83, RESTORATION 1,570,000 <-- 18 (BASE PROJECT ALLOCATION - $1,479,000) 19 (LAND ALLOCATION - $1,000) 20 (DESIGN AND CONTINGENCIES - $90,000) 21 (b) PA 283 22 (1) I-283 to PA 341, Pavement 23 Rehabilitation and Safety Improvements 6,962,000 24 (Base Project Allocation - $6,500,000) 25 (Land Allocation - $2,000) 26 (Design and Contingencies - $460,000) 27 (c) US 22 28 (1) Construction of Pedestrian Tunnel or 29 Overhead Crossing of US 22 near Manor 30 Drive in West Hanover Township 3,250,000 19970S0185B2078 - 56 -
1 (Base Project Allocation - $3,000,000) 2 (Land Allocation - $100,000) 3 (Design and Contingencies - $150,000) 4 (d) Pleasant View Road 5 (1) Install New Signals and Reconstruct 6 Highway-Railroad Grade Crossing on 7 Pleasant View Road, South Hanover 8 Township 190,000 9 (Base Project Allocation - $150,000) 10 (Land Allocation - $20,000) 11 (Design and Contingencies - $20,000) 12 (e) I-81 <-- 13 (1) Installation of sound barriers on 14 north and south sides of I-81 from 15 intersection with I-83 to Mountain Road 16 Interchange 5,300,000 17 (Base Project Allocation - $5,000,000) 18 (Design and Contingencies - $300,000) 19 (f) (E) PA 225 <-- 20 (1) Briardale Road to PA 325, Middle 21 Paxton Township, Resurfacing 116,000 22 (Base Project Allocation - $116,000) 23 (g) PA 225 <-- 24 (1) (2) South Road to Briardale Road, <-- 25 Middle Paxton Township, Widen to Three 26 Lanes 111,000 27 (Base Project Allocation - $111,000) 28 (3) SOUTH ROAD TO PA 325, MIDDLE PAXTON <-- 29 TOWNSHIP, RESURFACE 227,000 30 (BASE PROJECT ALLOCATION - $227,000) 19970S0185B2078 - 57 -
1 (F) I-83 2 (1) 19TH STREET TO I-81, RESTORATION 12,000,000 3 (BASE PROJECT ALLOCATION - $10,000,000) 4 (LAND ALLOCATION - $500,000) 5 (DESIGN AND CONTINGENCIES - $1,500,000) 6 (2) UNION DEPOSIT TO I-81, ENGINEERING 1,400,000 7 (DESIGN AND CONTINGENCIES - $1,400,000) 8 (G) US 322 9 (1) PENN HARRIS INTERCHANGE TO LEBANON 10 COUNTY LINE, PAVEMENT RESTORATION 1,610,000 11 (BASE PROJECT ALLOCATION - $1,300,000) 12 (LAND ALLOCATION - $10,000) 13 (DESIGN AND CONTINGENCIES - $300,000) 14 (H) SR 39 15 (1) INTERSECTION WITH I-81, INTERSECTION 16 IMPROVEMENTS 3,400,000 17 (BASE PROJECT ALLOCATION - $3,200,000) 18 (DESIGN AND CONTINGENCIES - $200,000) 19 (I) SR 3015 20 (1) VALLEY ROAD TO PAXTON CHURCH ROAD, 21 RECONSTRUCTION, WIDENING AND 22 INTERSECTION IMPROVEMENTS 993,000 23 (BASE PROJECT ALLOCATION - $993,000) 24 Section 323. Delaware County. 25 (a) US 30 26 (1) Ithan Avenue, Villanova University, 27 Pedestrian Tunnel and Turn Lanes 600,000 28 (Base Project Allocation - $600,000) 29 (b) I-95 <-- 30 (1) Install Sound Barriers on I-95 on East 19970S0185B2078 - 58 -
1 Side from SR 420 to SR 291 2,100,000 2 (Base Project Allocation - $2,000,000) 3 (Design and Contingencies - $100,000) 4 (c) (B) P & W Bike/Pedestrian Trail <-- 5 (1) Radnor Township, Bikeway 140,000 6 (Base Project Allocation - $112,000) 7 (Design and Contingencies - $28,000) 8 (C) I-476 <-- 9 (1) US 1 TO PA 3, INTERCHANGE 10 IMPROVEMENTS 100,000 11 (BASE PROJECT ALLOCATION - $80,000) 12 (LAND ALLOCATION - $10,000) 13 (DESIGN AND CONTINGENCIES - $10,000) 14 (D) (C) PA 252 <-- 15 (1) CONNECT PA 252 NEAR WINDING WAY WITH 16 PA 3 NEAR ROE ROAD, CONSTRUCT NEW 17 ROADWAY 1,900,000 18 (BASE PROJECT ALLOCATION - $1,500,000) 19 (LAND ALLOCATION - $100,000) 20 (DESIGN AND CONTINGENCIES - $300,000) 21 (2) US 1 TO PA 3, INTERCHANGE 22 IMPROVEMENTS 416,000 23 (BASE PROJECT ALLOCATION - $360,000) 24 (LAND ALLOCATION - $20,000) 25 (DESIGN AND CONTINGENCIES - $36,000) 26 (3) PA 252/PA 3 CONNECTOR FROM PA 3 TO 27 CHESTER COUNTY LINE, INTERSECTION AND 28 SAFETY IMPROVEMENTS 179,000 29 (BASE PROJECT ALLOCATION - $139,000) 30 (LAND ALLOCATION - $16,000) 19970S0185B2078 - 59 -
1 (DESIGN AND CONTINGENCIES - $24,000) 2 (E) (D) PA 3 <-- 3 (1) PA 252 TO I-476, INTERSECTION AND 4 CORRIDOR IMPROVEMENTS 280,000 5 (BASE PROJECT ALLOCATION - $240,000) 6 (LAND ALLOCATION - $20,000) 7 (DESIGN AND CONTINGENCIES - $20,000) 8 (F) (E) US 202 <-- 9 (1) BALTIMORE PIKE TO STREET ROAD, 10 PAVEMENT REHABILITATION AND SAFETY 11 IMPROVEMENTS 500,000 12 (BASE PROJECT ALLOCATION - $300,000) 13 (DESIGN AND CONTINGENCIES - $200,000) 14 (G) (F) SR 2016 <-- 15 (1) SIGNAL IMPROVEMENTS ON SR 2016 FROM 16 WALLINGFORD ROAD TO BISHOP AVENUE, 17 SPRINGFIELD TOWNSHIP 125,000 18 (BASE PROJECT ALLOCATION - $101,000) 19 (DESIGN AND CONTINGENCIES - $24,000) 20 (H) (G) US 322 <-- 21 (1) WIDENING AND INTERSECTION IMPROVEMENTS 22 FROM US 1 TO ROUTE 452, WIDEN FROM TWO 23 TO FOUR LANES 45,000,000 24 (BASE PROJECT ALLOCATION - $45,000,000) 25 (I) (H) CHESTER WATERFRONT <-- 26 (1) ACCESS FROM I-95 AND US 322, WIDEN OR 27 LOWER OR BOTH GRADES TO INCREASE 28 VERTICAL CLEARANCE AT AMTRAK 29 UNDERPASSES ON HIGHLAND AVENUE, FLOWER 30 STREET, ENGLE STREET AND MORTON AVENUE 5,000,000 19970S0185B2078 - 60 -
1 (BASE PROJECT ALLOCATION - $5,000,000) 2 (J) (I) PA 291 <-- 3 (1) WIDENING AND ENVIRONMENTAL REMEDIATION 4 FROM FRANKLIN STREET TO TRAINER BOROUGH 5 LINE, WIDEN FROM TWO TO FOUR LANES PLUS 6 A PASSING LANE 21,500,000 7 (BASE PROJECT ALLOCATION - $20,500,000) 8 (ENVIRONMENTAL REMEDIATION - 9 $1,000,000) 10 (K) (J) US 202 <-- 11 (1) WIDENING TO SIX LANES, AND FROM 12 DELAWARE STATE LINE TO CHESTER COUNTY 13 LINE, WIDEN FROM FOUR TO SIX LANES 100,000,000 14 (BASE PROJECT ALLOCATION - 15 $100,000,000) 16 (L) (K) I-476 <-- 17 (1) WIDEN FOUR-LANE PORTION TO SIX LANES, 18 FROM I-95 TO PA 3 100,000,000 19 (BASE PROJECT ALLOCATION - 20 $100,000,000) 21 (M) (L) STEVENS DRIVE <-- 22 (1) GRADE CROSSING IN TINICUM TOWNSHIP 2,500,000 23 (BASE PROJECT ALLOCATION - $2,500,000) 24 (N) (M) MEDIA BOROUGH <-- 25 (1) REPAIR DAM UNDER THIRD STREET IN 26 MEDIA, REPAIR EARTHEN DAM UNDER THIRD 27 STREET IN MEDIA BOROUGH JUST WEST OF 28 THIRD STREET AND WEST STREET 29 INTERSECTION 500,000 30 (BASE PROJECT ALLOCATION - $500,000) 19970S0185B2078 - 61 -
1 (O) (N) I-95 <--
2 (1) CONSTRUCTION OF SOUTHBOUND ENTRANCE TO
3 I-95 AT EDGEMONT AVENUE 5,700,000
4 (BASE PROJECT ALLOCATION - $5,700,000)
5 (2) I-95/PHILADELPHIA INTERNATIONAL AIRPORT, <--
6 INTERCHANGE AND ACCESS IMPROVEMENTS 90,000,000
7 (BASE PROJECT ALLOCATION - $80,000,000)
8 (LAND ALLOCATION - $1,000,000)
9 (DESIGN AND CONTINGENCIES - $9,000,000)
10 SECTION 323.1. DISTRICT FOUR.
11 (A) DISTRICT FOUR PROJECTS
12 (1) VARIOUS STATE ROUTES, DAYLIGHT
13 INTERSECTIONS AT VARIOUS LOCATIONS,
14 SAFETY IMPROVEMENTS 72,000
15 (BASE PROJECT ALLOCATION - $55,000)
16 (LAND ALLOCATION - $10,000)
17 (DESIGN AND CONTINGENCIES - $7,000)
18 Section 324. Elk County.
19 (a) Osterhout Street
20 (1) From SR 120 Intersection to SR 219
21 Intersection, Reconstruct to 24 Feet 3,585,000
22 (Base Project Allocation - $2,500,000)
23 (Land Allocation - $600,000)
24 (Design and Contingencies - $485,000)
25 (b) Elk County Industrial Park Access Road
26 (1) SR 120, SR 255, SR 1001, SR 1002, SR
27 1003 and SR 1008, Reconstruct to 24
28 Feet 2,882,000
29 (Base Project Allocation - $2,632,000)
30 (Land Allocation - $100,000)
19970S0185B2078 - 62 -
1 (Design and Contingencies - $150,000)
2 (c) US 219
3 (1) Relocation of Allegheny & Eastern
4 Track to Allow for the Construction of
5 a US 219 Bypass of Johnsonburg 5,100,000
6 (Base Construction Allocation -
7 $3,900,000)
8 (Land Allocation - $1,000,000)
9 (Design and Contingencies - $200,000)
10 (D) PA 255 <--
11 (1) JOHNSONBURG CLIMBING LANE, ADD TRUCK
12 CLIMBING LANE 460,000
13 (BASE PROJECT ALLOCATION - $400,000)
14 (LAND ALLOCATION - $20,000)
15 (DESIGN AND CONTINGENCIES - $40,000)
16 (E) PA 120
17 (1) ST. MARY'S NETWORK TRAFFIC PATTERN
18 REVISIONS AT VARIOUS LOCATIONS 1,014,000
19 (BASE PROJECT ALLOCATION - $714,000)
20 (LAND ALLOCATION - $180,000)
21 (DESIGN AND CONTINGENCIES - $120,000)
22 (F) SR 1014
23 (1) FROM SR 120 TO SR 219, RECONSTRUCTION 1,265,000
24 (BASE PROJECT ALLOCATION - $950,000)
25 (LAND ALLOCATION - $190,000)
26 (DESIGN AND CONTINGENCIES - $125,000)
27 (G) T-520
28 (1) CONVERT TO STATE ROAD AND RECONSTRUCT <--
29 TO PROMOTE ELK-HERD TOURISM IN
30 BENEZETTE TOWNSHIP 500,000
19970S0185B2078 - 63 -
1 (H) T-647 2 (1) CONVERT TO STATE ROAD AND RECONSTRUCT 3 IN JAY TOWNSHIP 1,000,000 4 Section 325. Erie County. 5 (a) SR 4024 6 (1) SR 4024 Extension, US 19 to Bush 7 Industrial Road, Summit Township, 8 Construct New Roadway and Intersection 9 Improvements 620,000 10 (Base Project Allocation - $400,000) 11 (Land Allocation - $120,000) 12 (Design and Contingencies - $100,000) 13 (b) I-79 14 (1) Crawford County Line to I-90 LAKE ERIE <-- 15 in Erie County, Pavement Rehabilitation 16 and Safety Improvements 1,900,000 17 (Base Project Allocation - $1,700,000) 18 (Land Allocation - $10,000) 19 (Design and Contingencies - $190,000) 20 (c) SR 3006 21 (1) From Bridge to Erie Street, Borough of 22 Edinboro, Add Turn Lanes 64,000 23 (Base Project Allocation - $44,000) 24 (Land Allocation - $10,000) 25 (Design and Contingencies - $10,000) 26 (d) SR 4034 27 (1) City of Erie, East Side Access, Port <-- 28 Access Road to East 6th Street, new 29 two-lane roadway 1,176,000 30 (Base Project Allocation - $647,000) 19970S0185B2078 - 64 -
1 (Land Allocation - $329,000) 2 (Design and Contingencies - $200,000) 3 (2) City of Erie, East Side Access, East 4 6th Street to East 12th Street, new 5 two-lane roadway 830,000 6 (Base Project Allocation - $30,000) 7 (Land Allocation - $440,000) 8 (Design and Contingencies - $360,000) 9 (3) City of Erie, East Side Access, Port 10 Access Road, Larson Text Right-of-Way 11 Acquisition 200,000 12 (Land Allocation - $200,000) 13 (4) (1) CITY OF ERIE, PORT ACCESS TO I-90 <-- 14 NEW FOUR-LANE ROADWAY 20,434,000 15 (BASE PROJECT ALLOCATION - $16,000,000) 16 (LAND ALLOCATION - $2,400,000) 17 (DESIGN AND CONTINGENCIES - $2,034,000) 18 (5) (2) EAST SIDE ACCESS CORRIDOR, TMS <-- 19 IMPROVEMENTS 800,000 20 (BASE PROJECT ALLOCATION - $600,000) 21 (LAND ALLOCATION - $100,000) 22 (DESIGN AND CONTINGENCIES - $100,000) 23 (e) SR 4016 24 (1) West 38th Street, Shunpike Road to 25 Myrtle Street, Realignment/Relocation 940,000 26 (Base Project Allocation - $800,000) 27 (Land Allocation - $50,000) 28 (Design and Contingencies - $90,000) 29 (f) SR 0299 30 (1) Millcreek Township, Powell Avenue 19970S0185B2078 - 65 -
1 Relocation 6,300,000 2 (Base Project Allocation - $4,700,000) 3 (Land Allocation - $600,000) 4 (Design and Contingencies - $1,000,000) 5 (g) SR 4024 6 (1) Summit Township, Robinson Road 7 Extensions 11,300,000 8 (Base Project Allocation - $9,800,000) 9 (Land Allocation - $700,000) 10 (Design and Contingencies - $800,000) 11 (h) SR 4026 12 (1) Millcreek Township, South Hill Road 13 Extensions 6,200,000 14 (Base Project Allocation - $4,800,000) 15 (Land Allocation - $750,000) 16 (Design and Contingencies - $650,000) 17 (I) I-90 <-- 18 (1) VARIOUS LOCATIONS, PAVEMENT 19 REHABILITATION AND SAFETY IMPROVEMENTS 1,100,000 20 (BASE PROJECT ALLOCATION - $1,000,000) 21 (DESIGN AND CONTINGENCIES - $100,000) 22 (J) US 19 23 (1) US 19 AND INTERCHANGE ROAD, 24 INTERSECTION IMPROVEMENT 2,000,000 25 (BASE PROJECT ALLOCATION - $1,700,000) 26 (LAND ALLOCATION - $200,000) 27 (DESIGN AND CONTINGENCIES - $100,000) 28 (2) US 19 TO BUSH INDUSTRIAL ROAD IN 29 SUMMIT TOWNSHIP, CONSTRUCT NEW ROADWAY 30 AND INTERSECTION IMPROVEMENTS 620,000 19970S0185B2078 - 66 -
1 (BASE PROJECT ALLOCATION - $400,000) 2 (LAND ALLOCATION - $120,000) 3 (DESIGN AND CONTINGENCIES - $100,000) 4 (K) SR 0000 5 (1) 19TH STREET IN MILLCREEK TOWNSHIP TO 6 DOWNING AVENUE IN CITY OF ERIE, REMOVE 7 RAIL LINE AND AT-GRADE CROSSINGS 1,400,000 8 (BASE PROJECT ALLOCATION - $1,200,000) 9 (LAND ALLOCATION - $60,000) 10 (DESIGN AND CONTINGENCIES - $140,000) 11 Section 326. Fayette County. 12 (a) SR 21 13 (1) SR 21 from Uniontown to Masontown, 14 Safety Improvements 2,000,000 15 (Design and Contingencies - $2,000,000) 16 (2) UNIONTOWN TO WAYNESBURG IN GREENE <-- 17 COUNTY, PAVEMENT REHABILITATION 2,600,000 18 (BASE PROJECT ALLOCATION - $2,080,000) 19 (LAND ALLOCATION - $260,000) 20 (DESIGN AND CONTINGENCIES - $260,000) 21 (b) SR 711 22 (1) SR 711 in Connellsville, Safety 23 Improvements 400,000 24 (Design and Contingencies - $400,000) 25 (C) PA 201 <-- 26 (1) ADELAIDE ROAD TO DUNBAR TOWNSHIP LINE, 27 PAVEMENT RESTORATION AND SAFETY 28 IMPROVEMENTS 440,000 29 (BASE PROJECT ALLOCATION - $400,000) 30 (LAND ALLOCATION - $20,000) 19970S0185B2078 - 67 -
1 (DESIGN AND CONTINGENCIES - $20,000) 2 (2) VANDERBILT BRIDGE TO PA 201, PAVEMENT 3 REHABILITATION AND SAFETY IMPROVEMENTS 840,000 4 (BASE PROJECT ALLOCATION - $800,000) 5 (LAND ALLOCATION - $20,000) 6 (DESIGN AND CONTINGENCIES - $20,000) 7 Section 327. Forest County. 8 (a) SR 666 9 (1) Beaver Run Bridge to Whig Hill 10 Highway, Restoration 980,000 11 (Base Project Allocation - $800,000) 12 (Land Allocation - $30,000) 13 (Design and Contingencies - $150,000) 14 (2) Whig Hill to Little Minister Run 15 Bridge, Restoration 1,380,000 16 (Base Project Allocation - $1,200,000) 17 (Land Allocation - $30,000) 18 (Design and Contingencies - $150,000) 19 (3) East of Upper Sheriff Creek to West of 20 Porcupine Run Bridge, Restoration 2,230,000 21 (Base Project Allocation - $2,000,000) 22 (Land Allocation - $30,000) 23 (Design and Contingencies - $200,000) 24 (4) West of Porcupine Run Bridge to Bobbs 25 Creek Bridge, Restoration 1,530,000 26 (Base Project Allocation - $1,300,000) 27 (Land Allocation - $30,000) 28 (Design and Contingencies - $200,000) 29 (5) Bobbs Creek Bridge to Little Minister 30 Run Bridge, Restoration 1,230,000 19970S0185B2078 - 68 -
1 (Base Project Allocation - $1,000,000)
2 (Land Allocation - $30,000)
3 (Design and Contingencies - $200,000)
4 (6) Village of Lynch to Village of Whig
5 Hill, Howe and Kingsley Townships,
6 Reconstruction 16,500,000
7 (Base Project Allocation - $14,000,000)
8 (Land Allocation - $1,000,000)
9 (Design and Contingencies - $1,500,000)
10 (7) US 62 TO PA 948, ROADWAY <--
11 RECONSTRUCTION 23,850,000
12 (BASE PROJECT ALLOCATION - $20,300,000)
13 (LAND ALLOCATION - $1,150,000)
14 (DESIGN AND CONTINGENCIES - $2,400,000)
15 (B) SR 66
16 (1) REHABILITATION SR 66 FROM MARIENVILLE
17 TO CLARION COUNTY LINE 1,280,000
18 (C) SR 2005
19 (1) PAVE SR 2005 ALONG WITH SEVEN MILES OF
20 TOWNSHIP ROAD 3,000,000
21 Section 328. Franklin County (Reserved). <--
22 SECTION 328. FRANKLIN COUNTY. <--
23 (A) I-81
24 (1) EXIT 2 TO EXIT 3, ANTRIM TOWNSHIP,
25 CONSTRUCT CONNECTOR ROAD 2,000,000
26 (BASE PROJECT ALLOCATION - $1,700,000)
27 (LAND ALLOCATION - $100,000)
28 (DESIGN AND CONTINGENCIES - $200,000)
29 (2) GREENE TOWNSHIP, PAVEMENT
30 REHABILITATION AND SAFETY IMPROVEMENTS 2,073,000
19970S0185B2078 - 69 -
1 (BASE PROJECT ALLOCATION - $1,972,000) 2 (LAND ALLOCATION - $1,000) 3 (DESIGN AND CONTINGENCIES - $100,000) 4 (3) EXIT 2 RAMP, ACCESS AND SAFETY 5 IMPROVEMENTS 175,000 6 (BASE PROJECT ALLOCATION - $140,000) 7 (LAND ALLOCATION - $18,000) 8 (DESIGN AND CONTINGENCIES - $17,000) 9 (B) US 30 10 (1) INTERSECTION WITH HADE ROAD, SIGNAL 11 IMPROVEMENT 57,000 12 (BASE PROJECT ALLOCATION - $11,000) 13 (LAND ALLOCATION - $1,000) 14 (DESIGN AND CONTINGENCIES - $45,000) 15 (2) INTERSECTION WITH JACK ROAD, SIGNAL 16 IMPROVEMENTS 57,000 17 (BASE PROJECT ALLOCATION - $11,000) 18 (LAND ALLOCATION - $1,000) 19 (DESIGN AND CONTINGENCIES - $45,000) 20 (3) OLD US 30 TO ADAMS COUNTY LINE, 21 PAVEMENT RESTORATION 520,000 22 (BASE PROJECT ALLOCATION - $480,000) 23 (LAND ALLOCATION - $20,000) 24 (DESIGN AND CONTINGENCIES - $20,000) 25 (C) PA 16 <-- 26 (1) INTERSECTION WITH ANTRIM CHURCH ROAD, 27 ROADWAY AND INTERSECTION IMPROVEMENTS 250,000 28 (BASE PROJECT ALLOCATION - $200,000) 29 (LAND ALLOCATION - $25,000) 30 (DESIGN AND CONTINGENCIES - $25,000) 19970S0185B2078 - 70 -
1 Section 329. Fulton County. 2 (a) I-70 3 (1) Warfordsburg to Deneen Gap, 4 Rehabilitation and Safety Improvements 637,000 5 (Base Project Allocation - $607,000) 6 (Design and Contingencies - $30,000) 7 (2) CRYSTAL SPRING TO AMARANTH, PAVEMENT <-- 8 RESTORATION 1,700,000 9 (BASE PROJECT ALLOCATION - $1,600,000) 10 (DESIGN AND CONTINGENCIES - $100,000) 11 (3) TOWN HILL TO CRYSTAL SPRING, 12 RESTORATION 4,400,000 13 (BASE PROJECT ALLOCATION - $4,000,000) 14 (DESIGN AND CONTINGENCIES - $400,000) 15 (b) SR 1001 16 (1) Reconstruction of Intersection of SR 17 0016 and SR 1001 and Cito Road between 18 Intersection and a Point One Mile South 19 of Intersection 2,000,000 20 (Base Project Allocation - $1,600,000) 21 (Land Allocation - $100,000) 22 (Design and Contingencies - $300,000) 23 (2) CITO ROAD TO US 522, CONSTRUCT TWO- <-- 24 LANE ACCESS ROAD 200,000 25 (BASE PROJECT ALLOCATION - $185,000) 26 (LAND ALLOCATION - $10,000) 27 (DESIGN AND CONTINGENCIES - $5,000) 28 Section 330. Greene County. 29 (a) I-79 30 (1) 1 Mile North of Kirby to 3 Miles South 19970S0185B2078 - 71 -
1 of Waynesburg, Whiteley Township, 2 Resurfacing 360,000 3 (Base Project Allocation - $340,000) 4 (Design and Contingencies - $20,000) 5 (b) I-79 <-- 6 (1) (2) 3 Miles South of Waynesburg to <-- 7 Waynesburg, Franklin Township, 8 Resurfacing 500,000 9 (Base Project Allocation - $440,000) 10 (Design and Contingencies - $60,000) 11 Section 331. Huntingdon County. 12 (a) SR 26 13 (1) Huntingdon Borough and Oneida, Miller, 14 Jackson and Barree Townships, Isolated 15 Improvements along 22 Miles of SR 26, 16 Including Reconstruction and Widening 17 of Pavement, Realignment, Intersection 18 Improvements and Truck Climbing Lanes, 19 to Upgrade Highway to Current 20 Standards 25,500,000 21 (Base Project Allocation - $20,500,000) 22 (Land Allocation - $2,000,000) 23 (Design and Contingencies - $3,000,000) 24 (2) Reconstruction and Corridor 25 Improvements from Huntingdon Borough to 26 Centre County Line 25,000,000 27 (Base Project Allocation - $20,500,000) 28 (Land Allocation - $2,000,000) 29 (Design and Contingencies - $2,500,000) 30 (3) HUNTINGDON TO CENTRE COUNTY LINE, <-- 19970S0185B2078 - 72 -
1 HIGHWAY RECONSTRUCTION AND
2 IMPROVEMENTS 250,000
3 (BASE PROJECT ALLOCATION - $200,000)
4 (LAND ALLOCATION - $25,000)
5 (DESIGN AND CONTINGENCIES - $25,000)
6 (b) SR 944
7 (1) Engineering and Land Acquisition from
8 Intersection of SR 944 to Village of
9 Cooks 600,000
10 (Land Allocation - $100,000)
11 (Design and Contingencies - $500,000)
12 (C) SR 3043 AND SR 3045 <--
13 (1) RAYSTOWN RECREATION AREA ACCESS,
14 IMPROVEMENTS, WIDEN, RESURFACE AND
15 SAFETY IMPROVEMENTS 832,000
16 (BASE PROJECT ALLOCATION - $750,000)
17 (LAND ALLOCATION - $12,000)
18 (DESIGN AND CONTINGENCIES - $70,000)
19 (D) PA 453
20 (1) WATER STREET TO TYRONE, ROADWAY
21 IMPROVEMENTS 250,000
22 (BASE PROJECT ALLOCATION - $200,000)
23 (LAND ALLOCATION - $25,000)
24 (DESIGN AND CONTINGENCIES - $25,000)
25 Section 332. Indiana County (Reserved). <--
26 SECTION 332. INDIANA COUNTY. <--
27 (A) PA 56
28 (1) US 22 TO WESTMORELAND COUNTY LINE,
29 REALIGNMENT AND RECONSTRUCTION 6,000,000
30 (BASE PROJECT ALLOCATION - $4,400,000)
19970S0185B2078 - 73 -
1 (LAND ALLOCATION - $600,000) 2 (DESIGN AND CONTINGENCIES - $1,000,000) 3 (B) PA 403 4 (1) US 22 TO CAMBRIA COUNTY LINE, 5 REALIGNMENT AND RECONSTRUCTION 4,000,000 6 (BASE PROJECT ALLOCATION - $3,000,000) 7 (LAND ALLOCATION - $400,000) 8 (DESIGN AND CONTINGENCIES - $600,000) 9 (2) TR 553 TO CLYMER, PAVEMENT 10 REHABILITATION AND SAFETY IMPROVEMENTS 420,000 11 (BASE PROJECT ALLOCATION - $400,000) 12 (DESIGN AND CONTINGENCIES - $20,000) 13 (3) INTERSECTION WITH PA 711, CRAMER 14 BOROUGH, INTERSECTION RECONSTRUCTION 15 AND SAFETY IMPROVEMENTS 2,000,000 16 (BASE PROJECT ALLOCATION - $1,500,000) 17 (LAND ALLOCATION - $200,000) 18 (DESIGN AND CONTINGENCIES - $300,000) 19 (C) US 422 20 (1) ARMSTRONG COUNTY LINE TO CAMBRIA 21 COUNTY LINE, PAVEMENT REHABILITATION 22 AND SAFETY IMPROVEMENTS 220,000 23 (BASE PROJECT ALLOCATION - $200,000) 24 (DESIGN AND CONTINGENCIES - $20,000) 25 (D) US 422 AND US 119 26 (1) INDIANA BYPASS NORTH PM, RESURFACE, 27 PAVEMENT REHABILITATION AND SAFETY 28 IMPROVEMENTS 690,000 29 (BASE PROJECT ALLOCATION - $660,000) 30 (DESIGN AND CONTINGENCIES - $30,000) 19970S0185B2078 - 74 -
1 (2) INDIANA BYPASS SOUTH PM, RESURFACE,
2 PAVEMENT REHABILITATION AND SAFETY
3 IMPROVEMENTS 1,030,000
4 (BASE PROJECT ALLOCATION - $1,000,000)
5 (DESIGN AND CONTINGENCIES - $30,000)
6 Section 333. Jefferson County.
7 (a) I-80
8 (1) Milepost 91 to Clearfield County Line,
9 Pavement Rehabilitation and Safety
10 Improvements 500,000
11 (Base Project Allocation - $447,000)
12 (Land Allocation - $3,000)
13 (Design and Contingencies - $50,000)
14 (2) Exit 15, Railroad Overpass to
15 Westbound Roadside Rest, Interstate
16 Preventative Maintenance 3,580,000
17 (Base Project Allocation - $3,500,000)
18 (Design and Contingencies - $80,000)
19 (3) CORSICA EAST FROM US 322 TO PA 28, <--
20 PAVEMENT RESTORATION 2,600,000
21 (BASE PROJECT ALLOCATION - $2,500,000)
22 (DESIGN AND CONTINGENCIES - $100,000)
23 (4) RESTORATION OF 4.8 MILES NEAR EXIT 15,
24 PAVEMENT RESTORATION 4,600,000
25 (BASE PROJECT ALLOCATION - $4,500,000)
26 (DESIGN AND CONTINGENCIES - $100,000)
27 Section 334. Juniata County (Reserved). <--
28 SECTION 334. JUNIATA COUNTY. <--
29 (A) US 322/22
30 (1) NARROWS TO PERRY COUNTY LINE, PAVEMENT
19970S0185B2078 - 75 -
1 RESTORATION 9,600,000 2 (BASE PROJECT ALLOCATION - $9,500,000) 3 (DESIGN AND CONTINGENCIES - $100,000) 4 Section 335. Lackawanna County. 5 (a) I-81 6 (1) Various routes in Lackawanna and 7 Luzerne Counties, in the Vicinity of 8 Scranton and Wilkes-Barre, Intelligent 9 Transportation Systems Study 80,000 10 (Design and Contingencies - $80,000) 11 (2) Luzerne County Line to Susquehanna 12 County Line, Pavement Rehabilitation 13 and Safety Improvements 2,700,000 14 (Base Project Allocation - $2,416,000) 15 (Land Allocation - $14,000) 16 (Design and Contingencies - $270,000) 17 (3) Reconstruction of I-81 and Davis 18 Street Interchange to Increase Length 19 of Entrance and Exit Ramps 5,000,000 20 (Base Project Allocation - $4,600,000) 21 (Land Allocation - $300,000) 22 (Design and Contingencies - $100,000) 23 (4) EXIT 56 TO EXIT 57, CONSTRUCT ACCESS <-- 24 IMPROVEMENTS 500,000 25 (BASE PROJECT ALLOCATION - $400,000) 26 (LAND ALLOCATION - $50,000) 27 (DESIGN AND CONTINGENCIES - $50,000) 28 (5) DESIGN AND CONSTRUCTION OF NEW I-81 <-- 29 INTERCHANGE BETWEEN EXITS 56 AND 57 IN 30 SCRANTON 975,000 19970S0185B2078 - 76 -
1 (6) PROPERTY ACQUISITION RELATING TO THE 2 LACKAWANNA VALLEY INDUSTRIAL HIGHWAY IN 3 SWINICK DEVELOPMENT ADJACENT TO I-81, 4 DUNMORE BOROUGH 1,500,000 5 (7) NOISE BARRIERS ON NORTH SIDE OF I-81 6 FROM RIVER STREET EXIT TO BROOK STREET 7 IN THE VICINITY OF ST. MARY'S CEMETERY, 8 CITY OF SCRANTON 2,000,000 9 (8) CONSTRUCTION OF STORM WATER MANAGEMENT 10 SYSTEM FROM RIVER STREET SOUTH TO 11 STAFFORD MEADOWBROOK CREEK 2,400,000 12 (BASE PROJECT ALLOCATION - $2,000,000) 13 (DESIGN AND CONTINGENCIES - $400,000) 14 (b) I-84 15 (1) I-81 to Wayne County Line, Pavement 16 Rehabilitation and Safety Improvements 1,200,000 17 (Base Project Allocation - $1,074,000) 18 (Land Allocation - $6,000) 19 (Design and Contingencies - $120,000) 20 (c) I-380 21 (1) I-84 to Monroe County Line, Pavement 22 Rehabilitation and Safety Improvements 1,000,000 23 (Base Project Allocation - $895,000) 24 (Land Allocation - $5,000) 25 (Design and Contingencies - $100,000) 26 (d) US 6 and US 11 27 (1) Construction of Clarks Summit Bypass 25,000,000 28 (Base Project Allocation - $24,000,000) 29 (Design and Contingencies - 1,000,000) 30 (2) Construction of Turning Lanes in South 19970S0185B2078 - 77 -
1 Abington Township 1,100,000 2 (Base Project Allocation - $1,000,000) 3 (Design and Contingencies - $100,000) 4 (3) CONSTRUCTION OF FIFTH LANE IN SOUTH <-- 5 ABINGTON TOWNSHIP, SAFETY IMPROVEMENTS 199,000 6 (BASE PROJECT ALLOCATION - $135,000) 7 (LAND ALLOCATION - $10,000) 8 (DESIGN AND CONTINGENCIES - $54,000) 9 (4) CONSTRUCTION OF STORM WATER MANAGEMENT 10 SYSTEM, US 6 AND US 11 IN SOUTH 11 ABINGTON TOWNSHIP 2,500,000 12 (5) CONSTRUCTION OF STORM WATER MANAGEMENT 13 SYSTEM, US 6 AND US 11 IN GLENBURN 14 TOWNSHIP 1,500,000 15 (e) SR 632 16 (1) Reconstruction and Drainage 17 Improvements, South Abington Township 350,000 18 (Base Project Allocation - $300,000) 19 (Design and Contingencies - $50,000) 20 (f) Shady Lane Road <-- 21 (2) CONSTRUCTION OF PARALLEL DRAINAGE <-- 22 SYSTEM IN ABINGTON TOWNSHIP AND 23 WAVERLY 500,000 24 (F) SR 4032 25 (1) WIDEN SHADY LANE ROAD RAILROAD VIADUCT 26 TO TWO LANES 2,000,000 27 (1) (2) Widen Railroad Tunnel 2,000,000 <-- 28 (Base Project Allocation - $1,800,000) 29 (Design and Contingencies - $200,000) 30 (g) Keyser - Milwaukee Road <-- 19970S0185B2078 - 78 -
1 (G) SR 3011 <-- 2 (1) Reconstruction of Road from Main 3 Street to Oak Street 250,000 4 (Base Project Allocation - $225,000) 5 (Design and Contingencies - $25,000) 6 (2) RECONSTRUCTION, INCLUDING REPAVING, <-- 7 CURBING AND STORM WATER MANAGEMENT 8 SYSTEM IN OLD FORGE BOROUGH 2,200,000 9 (3) KEYSER AVENUE FROM TAYLOR-OLD FORGE <-- 10 LINE TO TAYLOR-SCRANTON LINE, 11 CONSTRUCTION OF STORM WATER MANAGEMENT 12 SYSTEM, BOROUGH OF TAYLOR 2,400,000 13 (BASE PROJECT ALLOCATION - $2,000,000) 14 (DESIGN AND CONTINGENCIES - $400,000) 15 (4) KEYSER AVENUE FROM WEST MARKET STREET 16 TO SCRANTON-TAYLOR LINE, SR 307 AND SR 17 6307, CONSTRUCTION OF STORM WATER 18 MANAGEMENT SYSTEM, CITY OF SCRANTON 2,400,000 19 (BASE PROJECT ALLOCATION - $2,000,000) 20 (DESIGN AND CONTINGENCIES - $400,000) 21 (H) SR 3019 22 (1) INSTALLATION OF CURBING AND STORM 23 WATER MANAGEMENT SYSTEM IN OLD FORGE 24 AND MOOSIC BOROUGHS 2,000,000 25 (I) SR 307 AND SR 690 26 (1) INSTALLATION OF SIGNALS AT 27 INTERSECTION OF SR 307 AND SR 690, 28 SPRINGBROOK TOWNSHIP 200,000 29 (J) PA 502 30 (1) PA 435 TO US 11, PAVEMENT 19970S0185B2078 - 79 -
1 REHABILITATION AND SAFETY IMPROVEMENTS 1,242,000 2 (BASE PROJECT ALLOCATION - $828,000) 3 (DESIGN AND CONTINGENCIES - $414,000) 4 (K) US 11 AND SR 3002 5 (1) CENTRAL SCRANTON EXPRESSWAY, PAVEMENT 6 REHABILITATION AND SAFETY IMPROVEMENTS 1,400,000 7 (BASE PROJECT ALLOCATION - $1,200,000) 8 (DESIGN AND CONTINGENCIES - $200,000) 9 (L) PA 247 AND SR 2008 10 (1) I-84 AND INDUSTRIAL HIGHWAY, WIDEN 11 HIGHWAY 3,640,000 12 (BASE PROJECT ALLOCATION - $2,920,000) 13 (LAND ALLOCATION - $360,000) 14 (DESIGN AND CONTINGENCIES - $360,000) 15 (M) SR 307 <-- 16 (1) MORGAN HIGHWAY FROM KEYSER AVENUE TO 17 SCRANTON-SOUTH ABINGTON LINE, 18 CONSTRUCTION OF STORM WATER MANAGEMENT 19 SYSTEM, CITY OF SCRANTON 1,200,000 20 (BASE PROJECT ALLOCATION - $1,000,000) 21 (DESIGN AND CONTINGENCIES - $200,000) 22 (N) SR 347 23 (1) CYPRESS STREET FROM THROOP-OLYPHANT 24 LINE TO THROOP-DUNMORE LINE, 25 CONSTRUCTION OF STORM WATER MANAGEMENT 26 SYSTEM, BOROUGH OF THROOP 1,200,000 27 (BASE PROJECT ALLOCATION - $1,000,000) 28 (DESIGN AND CONTINGENCIES - $200,000) 29 (2) DUNMORE STREET FROM THROOP-OLYPHANT 30 LINE TO THROOP-DUNMORE LINE, 19970S0185B2078 - 80 -
1 CONSTRUCTION OF STORM WATER MANAGEMENT 2 SYSTEM, BOROUGH OF THROOP 1,200,000 3 (BASE PROJECT ALLOCATION - $1,000,000) 4 (DESIGN AND CONTINGENCIES - $200,000) 5 (O) SR 2020 6 (1) BLAKELY STREET FROM DUNMORE-SCRANTON 7 LINE TO DUNMORE-THROOP LINE, 8 CONSTRUCTION OF STORM WATER MANAGEMENT 9 SYSTEM, BOROUGH OF DUNMORE 1,200,000 10 (BASE PROJECT ALLOCATION - $1,000,000) 11 (DESIGN AND CONTINGENCIES - $200,000) 12 (2) DRINKER STREET FROM DUNMORE-SCRANTON 13 LINE TO I-380, CONSTRUCTION OF STORM 14 WATER MANAGEMENT SYSTEM, BOROUGH OF 15 DUNMORE 1,200,000 16 (BASE PROJECT ALLOCATION - $1,000,000) 17 (DESIGN AND CONTINGENCIES - $200,000) 18 (P) SR 3003 19 (1) JACKSON STREET FROM KEYSER AVENUE TO 20 NEWTON ROAD, CONSTRUCTION OF STORM 21 WATER MANAGEMENT SYSTEM, CITY OF 22 SCRANTON 600,000 23 (BASE PROJECT ALLOCATION - $500,000) 24 (DESIGN AND CONTINGENCIES - $100,000) 25 (2) NEWTON ROAD FROM JACKSON STREET TO 26 SCRANTON-NEWTON RAMSON LINE, 27 CONSTRUCTION OF STORM WATER MANAGEMENT 28 SYSTEM, CITY OF SCRANTON 2,400,000 29 (BASE PROJECT ALLOCATION - $2,000,000) 30 (DESIGN AND CONTINGENCIES - $400,000) 19970S0185B2078 - 81 -
1 (Q) SR 3010 2 (1) UNION STREET FROM MAIN STREET TO 3 KEYSER AVENUE, ROAD RECONSTRUCTION AND 4 CONSTRUCTION OF STORM WATER MANAGEMENT 5 SYSTEM, BOROUGH OF TAYLOR 2,400,000 6 (BASE PROJECT ALLOCATION - $2,000,000) 7 (DESIGN AND CONTINGENCIES - $400,000) 8 (R) SR 3012 9 (1) OAK STREET FROM MAIN STREET TO KEYSER 10 AVENUE, CONSTRUCTION OF STORM WATER 11 MANAGEMENT SYSTEM, BOROUGH OF TAYLOR 1,200,000 12 (BASE PROJECT ALLOCATION - $1,000,000) 13 (DESIGN AND CONTINGENCIES - $200,000) 14 (S) SR 3013 15 (1) MAIN AVENUE, FROM SCRANTON-TAYLOR LINE 16 TO SCRANTON-DICKSON CITY LINE, 17 CONSTRUCTION OF STROM WATER MANAGEMENT 18 SYSTEM, INCLUDING, BUT NOT LIMITED TO, 19 RECONSTRUCTION, STORM SEWERS, CURBING 20 AND SIDEWALKS, CITY OF SCRANTON 2,400,000 21 (BASE PROJECT ALLOCATION - $2,000,000) 22 (DESIGN AND CONTINGENCIES - $400,000) 23 (T) SR 3014 24 (1) LUZERNE STREET FROM MAIN AVENUE TO 25 KEYSER AVENUE, CONSTRUCTION OF STORM 26 WATER MANAGEMENT SYSTEM, CITY OF 27 SCRANTON 1,200,000 28 (BASE PROJECT ALLOCATION - $1,000,000) 29 (DESIGN AND CONTINGENCIES - $200,000) 30 (U) SR 3029 19970S0185B2078 - 82 -
1 (1) PROVIDENCE ROAD, FROM OLIVE STREET TO 2 MAIN AVENUE, CONSTRUCTION OF STORM 3 WATER MANAGEMENT SYSTEM, CITY OF 4 SCRANTON 2,200,000 5 (BASE PROJECT ALLOCATION - $1,900,000) 6 (DESIGN AND CONTINGENCIES - $300,000) 7 (V) SR 3033 8 (1) OAK STREET FROM KEYSER AVENUE TO NORTH 9 SCRANTON EXPRESSWAY, CONSTRUCTION OF 10 STORM WATER MANAGEMENT SYSTEM, CITY OF 11 SCRANTON 720,000 12 (BASE PROJECT ALLOCATION - $600,000) 13 (DESIGN AND CONTINGENCIES - $120,000) 14 (W) SR 6011 15 (1) GREEN RIDGE STREET FROM BLAKELY STREET 16 TO DUNMORE-SCRANTON LINE, CONSTRUCTION 17 OF STORM WATER MANAGEMENT SYSTEM, 18 BOROUGH OF DUNMORE 1,200,000 19 (BASE PROJECT ALLOCATION - $1,000,000) 20 (DESIGN AND CONTINGENCIES - $200,000) 21 (2) GREEN RIDGE STREET FROM MAIN AVENUE TO 22 SCRANTON-DUNMORE LINE, CONSTRUCTION OF 23 STORM WATER MANAGEMENT SYSTEM, CITY OF 24 SCRANTON 1,200,000 25 (BASE PROJECT ALLOCATION - $1,000,000) 26 (DESIGN AND CONTINGENCIES - $200,000) 27 (3) WEST MARKET STREET FROM KEYSER AVENUE 28 TO MAIN AVENUE, CONSTRUCTION OF STORM 29 WATER MANAGEMENT SYSTEM, CITY OF 30 SCRANTON 1,200,000 19970S0185B2078 - 83 -
1 (BASE PROJECT ALLOCATION - $1,000,000) 2 (DESIGN AND CONTINGENCIES - $200,000) 3 (X) US 11 4 (1) NORTH SCRANTON EXPRESSWAY, PAVEMENT 5 REHABILITATION AND SAFETY IMPROVEMENTS 320,000 6 (BASE PROJECT ALLOCATION - $300,000) 7 (DESIGN AND CONTINGENCIES - $20,000) 8 Section 336. Lancaster County. 9 (a) PA 23 10 (1) US 30 to Berks County Line, Pavement 11 Rehabilitation and Safety Improvements 2,200,000 12 (Base Project Allocation - $2,000,000) 13 (Design and Contingencies - $200,000) 14 (2) Four Lane Relocation Environmental 15 Impact Study 1,000,000 16 (Design and Contingencies - $1,000,000) 17 (3) US 30 to Berks County Line, Four Lane 18 Relocation of PA 23 60,000,000 19 (4) Environmental Impact Study 1,000,000 20 (5) US 30 TO BERKS COUNTY LINE, M.I.S., <-- 21 ROADWAY REHABILITATION AND SAFETY 22 IMPROVEMENTS 1,200,000 23 (BASE PROJECT ALLOCATION - $1,000,000) 24 (LAND ALLOCATION - $100,000) 25 (DESIGN AND CONTINGENCIES - $100,000) 26 (6) US 30 TO BERKS COUNTY LINE, CORRIDOR 27 IMPROVEMENTS 1,200,000 28 (BASE PROJECT ALLOCATION - $1,000,000) 29 (LAND ALLOCATION - $100,000) 30 (DESIGN AND CONTINGENCIES - $100,000) 19970S0185B2078 - 84 -
1 (b) PA 322 2 (1) Farmersville Road to PA 897, Pavement 3 Rehabilitation, Widen Shoulder and 4 Safety Improvements 1,320,000 5 (Base Project Allocation - $1,200,000) 6 (Design and Contingencies - $120,000) 7 (c) PA 372 8 (1) Oak Bottom Road to Germantown Avenue, 9 Pavement Rehabilitation and Safety 10 Improvements 2,200,000 11 (Base Project Allocation - $2,000,000) 12 (Design and Contingencies - $200,000) 13 (d) PA 896 14 (1) US 30 to Strasburg Borough, Pavement 15 Rehabilitation, Widen Shoulder and 16 Safety Improvements 1,980,000 17 (Base Project Allocation - $1,800,000) 18 (Design and Contingencies - $180,000) 19 (2) Strasburg Borough to PA 372, Valley 20 Road, Pavement Rehabilitation and 21 Safety Improvements 2,338,000 22 (Base Project Allocation - $2,126,000) 23 (Design and Contingencies - $212,000) 24 (3) STRASBURG TOWNSHIP AND STRASBURG <-- 25 BOROUGH, TWO-LANE RELOCATION 2,500,000 26 (BASE PROJECT ALLOCATION - $2,500,000) 27 (e) PA 897 28 (1) Amish Road to Adamstown Road, Pavement 29 Rehabilitation and Safety Improvements 3,850,000 30 (Base Project Allocation - $3,500,000) 19970S0185B2078 - 85 -
1 (Design and Contingencies - $350,000) 2 (f) US 30 3 (1) US 222 to PA 340 3,000,000 <-- 4 (Design and Contingencies - $3,000,000) 5 (2) PA 741 to PA 72 3,000,000 6 (Design and Contingencies - $3,000,000) 7 (1) PA 741 TO PA 72, WIDENING WEST, <-- 8 ROADWAY REHABILITATION 7,600,000 9 (BASE PROJECT ALLOCATION - $6,800,000) 10 (LAND ALLOCATION - $200,000) 11 (DESIGN AND CONTINGENCIES - $600,000) 12 (2) US 222 TO PA 340, WIDENING EAST, 13 ROADWAY REHABILITATION 9,540,000 14 (BASE PROJECT ALLOCATION - $8,740,000) 15 (LAND ALLOCATION - $200,000) 16 (DESIGN AND CONTINGENCIES - $600,000) 17 (3) PA 896 to PA 897 3,000,000 18 (Design and Contingencies - $3,000,000) 19 (4) PA 896 to PA 41, Environmental Impact 20 Study 1,000,000 21 (Design and Contingencies - $1,000,000) 22 (5) Widen to Five Lanes between PA 896 to 23 PA 41 10,000,000 24 (6) Intersection Improvements on Parallel 25 Roads to Alleviate Congestion Prior to 26 and During Reconstruction 1,000,000 27 (7) VICINITY OF PA 772 AND PA 41, <-- 28 RECONSTRUCTION 1,500,000 29 (BASE PROJECT ALLOCATION - $1,200,000) 30 (LAND ALLOCATION - $150,000) 19970S0185B2078 - 86 -
1 (DESIGN AND CONTINGENCIES - $150,000) 2 (g) SR 2015 3 (1) Strasburg Borough to PA 372, Pavement 4 Rehabilitation and Safety Improvements 2,860,000 5 (Base Project Allocation - $2,600,000) 6 (Design and Contingencies - $260,000) 7 (h) SR 2040 8 (1) Paradise Lane to PA 741, Pavement 9 Rehabilitation and Safety Improvements 671,000 10 (Base Project Allocation - $610,000) 11 (Design and Contingencies - $61,000) 12 (i) SR 3017 13 (1) PA 462 to Harrisburg Pike, Pavement 14 Rehabilitation and Safety Improvements 7,700,000 15 (Base Project Allocation - $7,000,000) 16 (Design and Contingencies - $700,000) 17 (j) PA 41 18 (1) PA 926 to US 30, Major Investment 19 Study 500,000 20 (Design and Contingencies - $500,000) 21 (k) PA 72/PA 501 Corridor 22 (1) Construction of Manheim Relief Route 3,400,000 23 (2) Construction of East Petersburg Relief 24 Route 2,400,000 25 (3) Widen PA 72 from PA 283 to Miller 26 Road 4,000,000 27 (l) Airport Road 28 (1) Relocate and Realign Airport Road in 29 Manheim Township 300,000 30 Section 337. Lawrence County (Reserved). 19970S0185B2078 - 87 -
1 Section 338. Lebanon County. 2 (a) I-81 3 (1) I-78 to Schuylkill County Line, 4 Pavement Rehabilitation and Safety 5 Improvements 1,500,000 6 (Base Project Allocation - $1,342,000) 7 (Land Allocation - $8,000) 8 (Design and Contingencies - $150,000) 9 (2) DAUPHIN COUNTY LINE TO SCHUYLKILL <-- 10 COUNTY LINE, PAVEMENT REHABILITATION 11 AND SAFETY IMPROVEMENTS 1,501,000 12 (BASE PROJECT ALLOCATION - $1,343,000) 13 (LAND ALLOCATION - $8,000) 14 (DESIGN AND CONTINGENCIES - $150,000) 15 (b) US 322 16 (1) PA 934/241 to PA 419, Intersection 17 Improvements 456,000 18 (Base Project Allocation - $410,000) 19 (Land Allocation - $28,000) 20 (Design and Contingencies - $18,000) 21 (c) SR 0897 22 (1) From SR 0501 West and Southwest beyond 23 intersection with SR 0419, Heidelberg 24 Township, reconstruct roadway 12,000,000 25 (Base Construction Allocation - 26 $12,000,000) 27 (d) I-78 28 (1) Construction of complete interchange 29 at intersection of I-78 and SR 343 in 30 Bethel Township 12,000,000 19970S0185B2078 - 88 -
1 (Base Construction Allocation - 2 $8,000,000) 3 (Land Allocation - $2,000,000) 4 (Design and Contingencies - $2,000,000) 5 (e) SR 501 6 (1) Construction of bypass of SR 501 on 7 the west side of Schafferstown from 8 Main Street to vicinity of Michter's 9 Road, Heidelberg Township 8,000,000 10 (Base Construction Allocation - 11 $6,000,000) 12 (Land Allocation - $1,000,000) 13 (Design and Contingencies - $1,000,000) 14 (F) PA 72 <-- 15 (1) JONESTOWN ROAD TO I-78, PAVEMENT 16 REHABILITATION AND SAFETY IMPROVEMENTS 460,000 17 (BASE PROJECT ALLOCATION - $300,000) 18 (LAND ALLOCATION - $10,000) 19 (DESIGN AND CONTINGENCIES - $150,000) 20 (G) US 22 21 (1) PA 343 TO US 22, PAVEMENT RESTORATION 1,100,000 22 (BASE PROJECT ALLOCATION - $1,000,000) 23 (DESIGN AND CONTINGENCIES - $100,000) 24 (2) PA 343 TO SR 1011, PAVEMENT 25 REHABILITATION AND SAFETY IMPROVEMENTS 510,000 26 (BASE PROJECT ALLOCATION - $200,000) 27 (LAND ALLOCATION - $10,000) 28 (DESIGN AND CONTINGENCIES - $300,000) 29 (H) PA 422/PA 934 INTERSECTION 30 (1) IMPROVEMENT OF INTERSECTION IN 19970S0185B2078 - 89 -
1 ANNVILLE TOWNSHIP 1,200,000 2 (BASE CONSTRUCTION ALLOCATION - 3 $900,000) 4 (LAND ALLOCATION - $150,000) 5 (DESIGN AND CONTINGENCIES - $150,000) 6 Section 339. Lehigh County. 7 (a) SR 1017 and SR 1008 8 (1) Reconstruct and Improve Mauch Chunk 9 Road, Schadt Avenue and Rural Road in 10 Whitehall Township 1,073,000 11 (Base Project Allocation - $774,000) 12 (Land Allocation - $120,000) 13 (Design and Contingencies - $179,000) 14 (b) SR 3017 15 (1) Widening to four lanes from Industrial 16 Drive to City Line Road, Hanover 17 Township 2,462,000 18 (Base Project Allocation - $1,610,000) 19 (Land Allocation - $572,000) 20 (Design and Contingencies - $280,000) 21 (2) Widening to four lanes from City Line 22 Road to Race Street Extension, Hanover 23 Township 2,720,000 24 (Base Project Allocation - $2,036,000) 25 (Land Allocation - $404,000) 26 (Design and Contingencies - $280,000) 27 (c) SR 1004 28 (1) Extend four lanes from SR 0987 to SR 29 3017, Catasauqua Borough 2,892,000 30 (Base Project Allocation - $926,000) 19970S0185B2078 - 90 -
1 (Land Allocation - $1,560,000) 2 (Design and Contingencies - $406,000) 3 (2) Widen to four lanes from SR 0987 to 4 Willowbrook Road, Hanover Township 2,770,000 5 (Base Project Allocation - $1,540,000) 6 (Land Allocation - $948,000) 7 (Design and Contingencies - $282,000) 8 (d) SR 0987 9 (1) Widen to four lanes from Avenue A to 10 SR 3017, Catasauqua Borough 3,660,000 11 (Base Project Allocation - $2,842,000) 12 (Land Allocation - $418,000) 13 (Design and Contingencies - $400,000) 14 (2) Widening of Schoenersville and Airport 15 Roads, Extension of Race Street, 16 Realignment of Airport Road/Race Street 17 Intersection in Hanover Township 4,066,000 18 (Base Project Allocation - $3,466,000) 19 (Land Allocation - $600,000) 20 (E) SR 2044 <-- 21 (1) SAUCON VALLEY ROAD 2, FOUR-LANE 22 RELOCATION 4,600,000 23 (BASE PROJECT ALLOCATION - $3,215,000) 24 (LAND ALLOCATION - $600,000) 25 (DESIGN AND CONTINGENCIES - $785,000) 26 (F) US 22 27 (1) MILL AND RESURFACE 1.4 MILES, LEHIGH 28 COUNTY 800,000 29 (BASE PROJECT ALLOCATION - $700,000) 30 (DESIGN AND CONTINGENCIES - $100,000) 19970S0185B2078 - 91 -
1 (2) CORRIDOR I-78 TO PA 33, TRANSPORTATION 2 STUDY 300,000 3 (BASE PROJECT ALLOCATION - $300,000) 4 (G) PA 309 5 (1) SAFETY AND CAPACITY IMPROVEMENTS 6 INCLUDING OLD PACKHOUSE ROAD 2,050,000 7 (BASE PROJECT ALLOCATION - $1,640,000) 8 (LAND ALLOCATION - $205,000) 9 (DESIGN AND CONTINGENCIES - $205,000) 10 (H) AMERICAN PARKWAY 11 (1) CONSTRUCT AMERICAN PARKWAY BRIDGE, 12 ALLENTOWN 8,000,000 13 (BASE PROJECT ALLOCATION - $6,400,000) 14 (LAND ALLOCATION - $800,000) 15 (DESIGN AND CONTINGENCIES - $800,000) 16 Section 340. Luzerne County. 17 (a) I-80 18 (1) White Haven to Carbon County Line, 19 Pavement Rehabilitation and Safety 20 Improvements 101,000 <-- 21 (Base Project Allocation - $90,000) 22 (Land Allocation - $1,000) 23 (Design and Contingencies - $10,000) 24 IMPROVEMENTS 191,000 <-- 25 (BASE PROJECT ALLOCATION - $90,000) 26 (LAND ALLOCATION - $1,000) 27 (DESIGN AND CONTINGENCIES - $100,000) 28 (b) I-81 29 (1) Schuylkill County Line to I-80, 30 Pavement Rehabilitation and Safety 19970S0185B2078 - 92 -
1 Improvements 1,200,000 2 (Base Project Allocation - $1,074,000) 3 (Land Allocation - $6,000) 4 (Design and Contingencies - $120,000) 5 (2) PA 29 to Lackawanna County Line, 6 Pavement Rehabilitation and Safety 7 Improvements 1,400,000 8 (Base Project Allocation - $1,253,000) 9 (Land Allocation - $7,000) 10 (Design and Contingencies - $140,000) 11 (c) SR 2007 12 (1) Reconstruction of Northampton Street 13 and SR 6309 at the Interchange of SR 14 2007 and SR 6309 900,000 15 (Base Project Allocation - $750,000) 16 (Land Allocation - $50,000) 17 (Design and Contingencies - $100,000) 18 (D) PA 309 <-- 19 (1) I-80 TO MOUNTAINTOP AT PA 347, 20 PAVEMENT REHABILITATION AND SAFETY 21 IMPROVEMENTS 1,040,000 22 (BASE PROJECT ALLOCATION - $693,000) 23 (DESIGN AND CONTINGENCIES - $347,000) 24 (2) UPPER DEMUNDS, DALLAS BOROUGH AND 25 DALLAS TOWNSHIP, SAFETY IMPROVEMENTS 26 AND SIGNALS 99,000 27 (BASE PROJECT ALLOCATION - $77,000) 28 (LAND ALLOCATION - $2,000) 29 (DESIGN AND CONTINGENCIES - $20,000) 30 (3) CITY OF WILKES-BARRE, DALLAS BOROUGH 19970S0185B2078 - 93 -
1 AND KINGSTON TOWNSHIP, SAFETY 2 IMPROVEMENTS AND SIGNALS 154,000 3 (BASE PROJECT ALLOCATION - $90,000) 4 (LAND ALLOCATION - $10,000) 5 (DESIGN AND CONTINGENCIES - $54,000) 6 (E) PA 924 7 (1) OAK RIDGE ROAD, RECONSTRUCT 8 INTERSECTION AND ACCESS IMPROVEMENTS 650,000 9 (BASE PROJECT ALLOCATION - $550,000) 10 (LAND ALLOCATION - $50,000) 11 (DESIGN AND CONTINGENCIES - $50,000) 12 (F) CENTER STREET 13 (1) CONSTRUCT ACCESS ROAD AND ASSOCIATED 14 IMPROVEMENTS BETWEEN CENTER STREET AND 15 PROSPECT STREET 8,000,000 16 (BASE PROJECT ALLOCATION - $7,300,000) 17 (LAND ALLOCATION - $340,000) 18 (DESIGN AND CONTINGENCIES - $360,000) 19 (G) PA 93 <-- 20 (1) BROAD STREET IN HAZELTON, WIDENING, 21 REHABILITATION AND INTERSECTION 22 IMPROVEMENTS 500,000 23 (BASE PROJECT ALLOCATION - $400,000) 24 (LAND ALLOCATION - $50,000) 25 (DESIGN AND CONTINGENCIES - $50,000) 26 (H) SR 29 27 (1) CONSTRUCTION OF ACCESS ROAD FROM SR 29 28 TO LUZERNE COUNTY COMMUNITY COLLEGE 4,000,000 29 Section 341. Lycoming County. 30 (a) SR 220 19970S0185B2078 - 94 -
1 (1) Shrewsbury Township, SR 220 North of 2 Tivoli to T-650, Raise Grade to Reduce 3 Flooding 750,000 4 (Base Project Allocation - $600,000) 5 (Land Allocation - $50,000) 6 (Design and Contingencies - $100,000) 7 (2) Shrewsbury Township, SR 220 South of 8 Glen Mawr to SR 2083, 0.7 Mile 9 Reconstruction, Improve Horizontal and 10 Vertical Alignment 1,250,000 11 (Base Project Allocation - $1,000,000) 12 (Land Allocation - $50,000) 13 (Design and Contingencies - $200,000) 14 (3) Shrewsbury Township, SR 220 North of 15 Glen Mawr to Former LR 41035 Turnback 16 Route, 0.3 Mile Reconstruction 720,000 17 (Base Project Allocation - $600,000) 18 (Land Allocation - $20,000) 19 (Design and Contingencies - $100,000) 20 (4) Spot improvements in Shrewsbury and 21 Penn Townships, Lycoming County and 22 Davidson Township, Sullivan County 9,250,000 23 (Base Project Allocation - $8,000,000) 24 (Land Allocation - $250,000) 25 (Design and Contingencies - $1,000,000) 26 (5) CLINTON COUNTY LINE TO WILLIAMSPORT, <-- 27 PAVEMENT REHABILITATION AND SAFETY 28 IMPROVEMENTS 400,000 29 (BASE PROJECT ALLOCATION - $400,000) 30 (6) WOODWARD TOWNSHIP TO LYCOMING CREEK, 19970S0185B2078 - 95 -
1 RESTORATION 1,700,000 2 (BASE PROJECT ALLOCATION - $1,550,000) 3 (DESIGN AND CONTINGENCIES - $150,000) 4 (b) SR 405 5 (1) Muncy Creek Township, SR 405, East of 6 Muncy between I-180 and PA 405/PA 442 7 Intersection, 0.5 Mile Reconstruction, 8 Raise Grade to Reduce Flooding 950,000 9 (Base Project Allocation - $800,000) 10 (Land Allocation - $50,000) 11 (Design and Contingencies - $100,000) 12 (2) I-180 to PA 405, Muncy Creek Township, 13 reconstruction to reduce recurrent 14 flooding 950,000 15 (Base Project Allocation - $800,000) 16 (Land Allocation - $50,000) 17 (Design and Contingencies - $100,000) 18 (c) I-180 19 (1) Williamsport Beltway, Pavement 20 Rehabilitation 550,000 21 (Base Project Allocation - $500,000) 22 (Design and Contingencies - $50,000) 23 (2) Construction of Lycoming Mall 24 Interchange and Related Road Network 25 Improvements 13,400,000 26 (Base Project Allocation - $8,600,000) 27 (Land Allocation - $3,600,000) 28 (Design and Contingencies - $1,200,000) 29 (3) FAXON TO US 15, RESTORATION 440,000 <-- 30 (BASE PROJECT ALLOCATION - $400,000) 19970S0185B2078 - 96 -
1 (DESIGN AND CONTINGENCIES - $40,000) 2 (4) LOYALSOCK CREEK BRIDGE TO US 220, 3 RESTORATION 2,000,000 4 (BASE PROJECT ALLOCATION - $1,800,000) 5 (DESIGN AND CONTINGENCIES - $200,000) 6 (5) MUNCY TO PA 54, RESTORATION 198,000 7 (BASE PROJECT ALLOCATION - $180,000) 8 (DESIGN AND CONTINGENCIES - $18,000) 9 (6) WESTBOUND LANES FROM FAXON TO US 15 10 NORTH, PAVEMENT RESTORATION AND 11 INTERCHANGE IMPROVEMENTS 4,500,000 12 (BASE PROJECT ALLOCATION - $4,400,000) 13 (DESIGN AND CONTINGENCIES - $100,000) 14 (7) INTERSECTION WITH SR 2049, INTERCHANGE 15 IMPROVEMENTS 3,000,000 16 (BASE PROJECT ALLOCATION - $2,400,000) 17 (LAND ALLOCATION - $300,000) 18 (DESIGN AND CONTINGENCIES - $300,000) 19 (8) CONSTRUCT ACCESS ROAD TO WILLIAMSPORT- 20 LYCOMING COUNTY AIRPORT 1,800,000 21 (BASE PROJECT ALLOCATION - $1,440,000) 22 (LAND ALLOCATION - $180,000) 23 (DESIGN AND CONTINGENCIES - $180,000) 24 (9) DESIGN AND CONSTRUCTION OF I-80 RAMP <-- 25 SYSTEM AND LOCAL ROAD IMPROVEMENTS IN 26 MUNCY TOWNSHIP 5,325,000 27 (d) Williamsport Regional Airport Access Road 28 (1) Construction of a New Two Lane Access 29 Road from the Wannersville Road 30 Interchange of I-180 to the 19970S0185B2078 - 97 -
1 Williamsport Regional Airport 15,000,000
2 (Base Project Allocation - $12,500,000)
3 (Land Allocation - $250,000)
4 (Design and Contingencies - $2,000,000)
5 (E) SR 405 <--
6 (1) WATSONTOWN TO LYCOMING COUNTY LINE,
7 PAVEMENT RESTORATION 360,000
8 (BASE PROJECT ALLOCATION - $320,000)
9 (LAND ALLOCATION - $20,000)
10 (DESIGN AND CONTINGENCIES - $20,000)
11 (F) US 15
12 (1) NORTHBOUND LANES FROM TROUT RUN TO
13 STEAM VALLEY, PAVEMENT RESTORATION 3,300,000
14 (BASE PROJECT ALLOCATION - $3,200,000)
15 (DESIGN AND CONTINGENCIES - $100,000)
16 Section 342. McKean County (Reserved). <--
17 SECTION 342. MCKEAN COUNTY. <--
18 (A) US 219
19 (1) BRADFORD BYPASS EXTENSION NEAR OWENS
20 WAY, NEW FOUR-LANE ROADWAY 1,377,000
21 (BASE PROJECT ALLOCATION - $1,118,000)
22 (LAND ALLOCATION - $80,000)
23 (DESIGN AND CONTINGENCIES - $179,000)
24 (B) US 6
25 (1) SMETHPORT TO MT. JEWETT, PAVEMENT
26 REHABILITATION AND SAFETY IMPROVEMENTS 420,000
27 (BASE PROJECT ALLOCATION - $400,000)
28 (DESIGN AND CONTINGENCIES - $20,000)
29 Section 343. Mercer County.
30 (a) I-79
19970S0185B2078 - 98 -
1 (1) Lawrence County Line to Crawford 2 County Line, Pavement Rehabilitation 3 and Safety Improvements 2,600,000 4 (Base Project Allocation - $2,327,000) 5 (Land Allocation - $13,000) 6 (Design and Contingencies - $260,000) 7 (2) INTERSECTION WITH PA 208 AND PA 258, <-- 8 SPRINGFIELD TOWNSHIP, HIGHWAY AND 9 INTERCHANGE IMPROVEMENTS 2,700,000 10 (BASE PROJECT ALLOCATION - $2,500,000) 11 (LAND ALLOCATION - $100,000) 12 (DESIGN AND CONTINGENCIES - $100,000) 13 (b) I-80 14 (1) PA 173 to Venango County Line, Safety 15 Improvements and Pavement 16 Rehabilitation, Length 4.0 Miles 12,600,000 17 (Base Project Allocation - $12,000,000) 18 (Design and Contingencies - $600,000) 19 (2) OHIO STATE LINE TO US 19, PAVEMENT <-- 20 REHABILITATION AND SAFETY IMPROVEMENTS 1,020,000 21 (BASE PROJECT ALLOCATION - $1,000,000) 22 (LAND ALLOCATION - $10,000) 23 (DESIGN AND CONTINGENCIES - $10,000) 24 (c) PA 208 25 (1) From PA 258 to Old Route 258, 26 Including Bridge over I-79, Widen to 48 27 Feet 14,700,000 28 (Base Construction Allocation - 29 $12,500,000) 30 (Land Allocation - $1,000,000) 19970S0185B2078 - 99 -
1 (Design and Contingencies - $1,200,000)
2 (d) SR 60
3 (1) Bridge Rehabilitation and Interchange
4 Improvement at SR 318 4,080,000
5 (Base Project Allocation - $3,800,000)
6 (Land Allocation - $80,000)
7 (Design and Contingencies - $200,000)
8 (2) T-369 TO BROADWAY, PAVEMENT <--
9 REHABILITATION AND SAFETY IMPROVEMENTS 620,000
10 (BASE PROJECT ALLOCATION - $600,000)
11 (DESIGN AND CONTINGENCIES - $20,000)
12 (E) PA 58
13 (1) NEAR JAMESTOWN, UNDERPASS REMOVAL AND
14 PAVEMENT REHABILITATION 250,000
15 (BASE PROJECT ALLOCATION - $200,000)
16 (LAND ALLOCATION - $20,000)
17 (DESIGN AND CONTINGENCIES - $20,000)
18 (F) PA 518
19 (1) HERMITAGE TOWNSHIP LAMORE ROAD OVER <--
20 PINE HOLLOW RUN, TWO-LANE RELOCATION 760,000
21 (BASE PROJECT ALLOCATION - $600,000)
22 (LAND ALLOCATION - $100,000)
23 (DESIGN AND CONTINGENCIES - $60,000)
24 (G) TR 18 <--
25 (1) REMOVE BOX BEAM BARRIER, ADD TURNING
26 LANES, SHOULDER AND INTERSECTION
27 IMPROVEMENTS 5,750,000
28 (BASE PROJECT ALLOCATION - $4,000,000)
29 (LAND ALLOCATION - $1,250,000)
30 (DESIGN AND CONTINGENCIES - $500,000)
19970S0185B2078 - 100 -
1 (2) HERMITAGE TO GREENVILLE, PAVEMENT 2 REHABILITATION AND SAFETY IMPROVEMENTS 440,000 3 (BASE PROJECT ALLOCATION - $400,000) 4 (LAND ALLOCATION - $20,000) 5 (DESIGN AND CONTINGENCIES - $20,000) 6 (H) PA 718 7 (1) IMPROVEMENTS TO ROUTE 718 IN THE 8 BOROUGH OF WHEATLAND AND CITIES OF 9 FARRELL AND SHARON 10,000,000 10 Section 344. Mifflin County (Reserved). <-- 11 SECTION 344. MIFFLIN COUNTY. <-- 12 (A) US 322 13 (1) US 22 AND US 322, NARROWS, LEWISTOWN 14 BYPASS, FOUR-LANE RELOCATION 85,000,000 15 (BASE PROJECT ALLOCATION - $80,000,000) 16 (LAND ALLOCATION - $5,000,000) 17 (2) ELECTRIC AVENUE TO NARROWS, PAVEMENT 18 RESTORATION 7,000,000 19 (BASE PROJECT ALLOCATION - $6,750,000) 20 (DESIGN AND CONTINGENCIES - $250,000) 21 Section 345. Monroe County. 22 (a) I-80 23 (1) Carbon County Line to PA 115, Pavement <-- 24 Rehabilitation and Safety Improvements 100,000 25 (Base Project Allocation - $89,000) 26 (Land Allocation - $1,000) 27 (Design and Contingencies - $10,000) 28 (2) (1) Construction of Full Interchange 29 at I-80, Exit 44 to Connect with US 30 611 13,000,000 19970S0185B2078 - 101 -
1 (Base Construction Allocation - 2 $10,000,000) 3 (Land Allocation - $2,000,000) 4 (Design and Contingencies - $1,000,000) 5 (3) (2) CARBON COUNTY LINE TO US 209, <-- 6 PAVEMENT REHABILITATION AND SAFETY 7 IMPROVEMENTS 2,190,000 8 (BASE PROJECT ALLOCATION - $1,989,000) 9 (LAND ALLOCATION - $1,000) 10 (DESIGN AND CONTINGENCIES - $200,000) 11 (4) (3) INTERCHANGE WITH I-380, <-- 12 INTERCHANGE IMPROVEMENTS 2,766,000 13 (BASE PROJECT ALLOCATION - $2,666,000) 14 (DESIGN AND CONTINGENCIES - $100,000) 15 (5) (4) I-80 AT TUNKHANNOCK, PAVEMENT <-- 16 RESTORATION 2,440,000 17 (BASE PROJECT ALLOCATION - $2,400,000) 18 (DESIGN AND CONTINGENCIES - $40,000) 19 (5) CONSTRUCTION OF DIAMOND-SHAPED <-- 20 INTERCHANGE AT EXIT 53 OF I-80 IN 21 DELAWARE WATER GAP TO PROVIDE ACCESS TO 22 VISITORS CENTER 14,000,000 23 (BASE PROJECT ALLOCATION - $13,000,000) 24 (DESIGN AND CONTINGENCIES - $1,000,000) 25 (b) SR 115 26 (1) From I-80, at Exit 43, South 27 Approximately 3.5 Miles to Long Pond 28 Road, Stabilize and Widen Shoulders 11,000,000 29 (Base Project Allocation - $10,500,000) 30 (Design and Contingencies - $500,000) 19970S0185B2078 - 102 -
1 (c) SR 209 2 (1) Construction of 4-lane Divided 3 Relocation of SR 209 at Intersection 4 with SR 402 in Smithfield Township 49,500,000 5 (Base Project Allocation - $35,000,000) 6 (Land Allocation - $10,000,000) 7 (Design and Contingencies - $4,500,000) 8 (2) Transportation Study for Possible 9 Marshalls Creek Bypass 300,000 10 (Design and Contingencies - $300,000) 11 (3) CONSTRUCTION OF INTERSECTION <-- 12 IMPROVEMENTS OF ROUTES 209/447 13 INTERSECTION JUST OFF EXIT 52 OF I-80 14 IN SMITHFIELD TOWNSHIP 3,800,000 15 (BASE PROJECT ALLOCATION - $3,500,000) 16 (DESIGN AND CONTINGENCIES - $300,000) 17 (d) SR 611 18 (1) Widen to 64 Feet Between T-535 and T- 19 537 in Pocono Township 2,600,000 20 (Base Project Allocation - $2,000,000) 21 (Land Allocation - $500,000) 22 (Design and Contingencies - $100,000) 23 (2) Restoration of SR 611 between Scotrun 24 and Swiftwater, Pocono Township 2,010,000 25 (Base Construction Allocation - 26 $2,000,000) 27 (Design and Contingencies - $10,000) 28 (3) FIVE-POINT INTERSECTION WITH SR 940 <-- 29 AND SR 196, INTERSECTION IMPROVEMENTS 540,000 30 (BASE PROJECT ALLOCATION - $400,000) 19970S0185B2078 - 103 -
1 (LAND ALLOCATION - $80,000) 2 (DESIGN AND CONTINGENCIES - $60,000) 3 (e) Pocono Scenic Vistas 4 (1) Construction of Pocono Scenic Vistas 5 in the Long Pond area 1,250,000 6 (Base Project Allocation - $100,000) 7 (Land Allocation - $1,050,000) 8 (Design and Contingencies - $100,000) 9 Section 346. Montgomery County. 10 (a) Souder Road 11 (1) Reconstruct Portion of Souder Road to 12 Remove Curves in Franconia Township 540,000 13 (Base Project Allocation - $400,000) 14 (Land Allocation - $100,000) 15 (Design and Contingencies - $40,000) 16 (b) SR 0029 17 (1) Collegeville Borough, SR 0029 18 realignment between Main Street and 1st 19 Avenue 1,900,000 20 (Base Project Allocation - $750,000) 21 (Land Allocation - $950,000) 22 (Design and Contingencies - $200,000) 23 (2) MAIN STREET, 1ST AVENUE AND 2ND <-- 24 AVENUE, ROADWAY REALIGNMENT 1,000,000 25 (BASE PROJECT ALLOCATION - $640,000) 26 (LAND ALLOCATION - $200,000) 27 (DESIGN AND CONTINGENCIES - $160,000) 28 (c) PA 23 29 (1) River Road at Balligomingo, West 30 Conshohocken Township, Roadway 19970S0185B2078 - 104 -
1 Relocation and Resignalization 424,000 2 (Base Project Allocation - $400,000) 3 (Land Allocation - $24,000) 4 (d) PA 463 5 (1) US 611 to PA 152, Horsham Township, 6 Intersection Improvements, Widening and 7 Restoration 830,000 8 (Base Project Allocation - $650,000) 9 (Land Allocation - $55,000) 10 (Design and Contingencies - $125,000) 11 (E) I-476 <-- 12 (1) I-76 TO CHEMICAL ROAD, PAVEMENT 13 REHABILITATION AND SAFETY IMPROVEMENTS 2,900,000 14 (BASE PROJECT ALLOCATION - $2,700,000) 15 (DESIGN AND CONTINGENCIES - $200,000) 16 (2) CONSTRUCTION NEW INTERCHANGE BETWEEN 17 NORRISTOWN AND QUAKERTOWN BOROUGHS 15,000,000 18 (BASE PROJECT ALLOCATION - $12,000,000) 19 (LAND ALLOCATION - $1,500,000) 20 (DESIGN AND CONTINGENCIES - $1,500,000) 21 (F) PA 100 22 (1) CHESTER COUNTY LINE TO BERKS COUNTY 23 LINE, PAVEMENT REHABILITATION AND 24 SAFETY IMPROVEMENTS 1,000,000 25 (BASE PROJECT ALLOCATION - $800,000) 26 (DESIGN AND CONTINGENCIES - $200,000) 27 (G) PA 113 28 (1) PERKIOMEN TO SKIPPACK, PAVEMENT 29 REHABILITATION AND SAFETY IMPROVEMENTS 1,193,000 30 (BASE PROJECT ALLOCATION - $340,000) 19970S0185B2078 - 105 -
1 (LAND ALLOCATION - $750,000) 2 (DESIGN AND CONTINGENCIES - $103,000) 3 (H) PA 63 4 (1) SUNNEYTOWN PIKE AND FORTY-FOOT ROAD, 5 WIDEN AND SIGNALS 165,000 6 (BASE PROJECT ALLOCATION - $130,000) 7 (LAND ALLOCATION - $15,000) 8 (DESIGN AND CONTINGENCIES - $20,000) 9 (I) PA 73 10 (1) HASBROOK AVENUE TO PA 611, PAVEMENT 11 REHABILITATION AND SAFETY IMPROVEMENTS 944,000 12 (BASE PROJECT ALLOCATION - $800,000) 13 (DESIGN AND CONTINGENCIES - $144,000) 14 (2) INTERSECTION WITH SWAMP PIKE, NEW 15 HANOVER TOWNSHIP, INTERSECTION 16 IMPROVEMENTS 825,000 17 (BASE PROJECT ALLOCATION - $650,000) 18 (LAND ALLOCATION - $75,000) 19 (DESIGN AND CONTINGENCIES - $100,000) 20 (J) SR 4022 21 (1) LEWIS ROAD CURVE FROM RIDGE ROAD TO 22 KNIGHTS ROAD, RECONSTRUCTION 800,000 23 (BASE PROJECT ALLOCATION - $600,000) 24 (LAND ALLOCATION - $50,000) 25 (DESIGN AND CONTINGENCIES - $150,000) 26 (K) US 202 27 (1) SWEDESFORD ROAD TO GULPH ROAD, OFF- 28 SITE IMPROVEMENTS 2,216,000 29 (BASE PROJECT ALLOCATION - $400,000) 30 (LAND ALLOCATION - $1,700,000) 19970S0185B2078 - 106 -
1 (DESIGN AND CONTINGENCIES - $116,000) 2 (2) SOUTHBOUND FROM JOHNSON HIGHWAY TO 3 MAIN STREET, RECONSTRUCTION 720,000 4 (BASE PROJECT ALLOCATION - $610,000) 5 (LAND ALLOCATION - $20,000) 6 (DESIGN AND CONTINGENCIES - $90,000) 7 (3) PA 63 TO SEPTA RAIL CROSSING, FOUR- 8 LANE HIGHWAY IMPROVEMENTS 3,200,000 9 (BASE PROJECT ALLOCATION - $2,400,000) 10 (LAND ALLOCATION - $500,000) 11 (DESIGN AND CONTINGENCIES - $300,000) 12 (4) SB MARKLEY STREET FROM JOHNSON HIGHWAY 13 TO MAIN STREET, RECONSTRUCTION 1,470,000 14 (BASE PROJECT ALLOCATION - $1,200,000) 15 (LAND ALLOCATION - $70,000) 16 (DESIGN AND CONTINGENCIES - $200,000) 17 (L) US 422 18 (1) CHESTER COUNTY PARK RESTORATION, 19 PAVEMENT REHABILITATION AND SAFETY 20 IMPROVEMENTS 3,400,000 21 (BASE PROJECT ALLOCATION - $3,000,000) 22 (DESIGN AND CONTINGENCIES - $400,000) 23 (2) CHESTER COUNTY LINE TO US 202, 24 PAVEMENT REHABILITATION AND SAFETY 25 IMPROVEMENTS 2,600,000 26 (BASE PROJECT ALLOCATION - $2,500,000) 27 (DESIGN AND CONTINGENCIES - $100,000) 28 (M) VALLEY FORGE NATIONAL HISTORIC PARK <-- 29 (1) CONSTRUCT ACCESS ROADS AND PARKING 30 FACILITIES 250,000 19970S0185B2078 - 107 -
1 (BASE PROJECT ALLOCATION - $200,000) 2 (LAND ALLOCATION - $25,000) 3 (DESIGN AND CONTINGENCIES - $25,000) 4 Section 347. Montour County. 5 (a) I-80 6 (1) Northumberland County Line to Columbia 7 County Line, Pavement Rehabilitation 8 and Safety Improvements 1,100,000 9 (Base Project Allocation - $984,000) 10 (Land Allocation - $6,000) 11 (Design and Contingencies - $110,000) 12 (2) EXIT 32 TO EXIT 34, RESTORATION 286,000 <-- 13 (BASE PROJECT ALLOCATION - $86,000) 14 (LAND ALLOCATION - $100,000) 15 (DESIGN AND CONTINGENCIES - $100,000) 16 Section 348. Northampton County. 17 (a) I-78 18 (1) Lehigh County Line to PA 412, Pavement <-- 19 Rehabilitation and Safety Improvements 300,000 20 (Base Project Allocation - $268,000) 21 (Land Allocation - $2,000) 22 (Design and Contingencies - $30,000) 23 (2) (1) LEHIGH COUNTY TO DELAWARE RIVER, <-- 24 PAVEMENT REHABILITATION AND SAFETY 25 IMPROVEMENTS 300,000 26 (BASE PROJECT ALLOCATION - $268,000) 27 (LAND ALLOCATION - $2,000) 28 (DESIGN AND CONTINGENCIES - $30,000) 29 (B) PA 412 <-- 30 (1) I-78 TO BETHLEHEM STEEL SITE, ROADWAY 19970S0185B2078 - 108 -
1 IMPROVEMENTS 500,000 2 (BASE PROJECT ALLOCATION - $400,000) 3 (LAND ALLOCATION - $50,000) 4 (DESIGN AND CONTINGENCIES - $50,000) 5 (C) BETHLEHEM STEEL SITE 6 (1) ROAD CONSTRUCTION IN AND AROUND SITE 750,000 7 (BASE PROJECT ALLOCATION - $600,000) 8 (LAND ALLOCATION - $75,000) 9 (DESIGN AND CONTINGENCIES - $75,000) 10 Section 349. Northumberland County. 11 (a) I-80 12 (1) PA 254 to Montour County Line, <-- 13 Pavement Rehabilitation and Safety 14 Improvements 100,000 15 (Base Project Allocation - $89,000) 16 (Land Allocation - $1,000) 17 (Design and Contingencies - $10,000) 18 (2) (1) MONTOUR COUNTY LINE TO UNION <-- 19 COUNTY LINE, RESTORATION 6,610,000 20 (BASE PROJECT ALLOCATION - $6,000,000) 21 (LAND ALLOCATION - $10,000) 22 (DESIGN AND CONTINGENCIES - $600,000) 23 (b) T-577, Marsh Drive 24 (1) Access Road and Related Improvement in 25 Milton Borough and West Chillisquaque 26 Township 1,600,000 27 (Base Project Allocation - $1,100,000) 28 (Land Allocation - $300,000) 29 (Design and Contingencies - $200,000) 30 (c) I-80 <-- 19970S0185B2078 - 109 -
1 (1) Milepost 207 to Milepost 214, 2 Restoration 600,000 3 (Design and Contingencies - $600,000) 4 (C) PA 147 <-- 5 (1) HERNDON TO SUNBURY, ADD TRUCK CLIMBING 6 LANES 5,500,000 7 (BASE PROJECT ALLOCATION - $5,000,000) 8 (LAND ALLOCATION - $100,000) 9 (DESIGN AND CONTINGENCIES - $400,000) 10 (2) TR 147 NORTH OF MILTON, ADD TWO LANES 11,843,000 11 (BASE PROJECT ALLOCATION - $10,772,000) 12 (LAND ALLOCATION - $134,000) 13 (DESIGN AND CONTINGENCIES - $937,000) 14 (D) PA 405 15 (1) WATSONTOWN TO LYCOMING COUNTY LINE, 16 PAVEMENT RESTORATION AND SAFETY 17 IMPROVEMENTS 420,000 18 (BASE PROJECT ALLOCATION - $320,000) 19 (DESIGN AND CONTINGENCIES - $100,000) 20 (E) PA 61 21 (1) STRONG TO KULPMONT, RESTORATION 220,000 22 (BASE PROJECT ALLOCATION - $120,000) 23 (LAND ALLOCATION - $50,000) 24 (DESIGN AND CONTINGENCIES - $50,000) 25 (F) CHIKELLANY AVENUE 26 (1) ROAD REPAIR AND DRAINAGE IN SUNBURY 60,000 27 Section 350. Perry County. 28 (a) SR 17 29 (1) Resurface and Construct Shoulder on SR 30 17 from Jackson Township through 19970S0185B2078 - 110 -
1 Saville Township 1,080,000 2 (Base Project Allocation - $1,000,000) 3 (Design and Contingencies - $80,000) 4 (2) PA 274 TO PA 850, PAVEMENT <-- 5 REHABILITATION, WIDEN AND SAFETY 6 IMPROVEMENTS 840,000 7 (BASE PROJECT ALLOCATION - $700,000) 8 (LAND ALLOCATION - $40,000) 9 (DESIGN AND CONTINGENCIES - $100,000) 10 (b) SR 233 11 (1) Resurface and Construct Shoulder on SR 12 233 from Green Park, Tyrone Township to 13 Cumberland County Line 620,000 14 (Base Project Allocation - $600,000) 15 (Design and Contingencies - $20,000) 16 (c) SR 274 17 (1) Resurface and Construct Shoulder on SR 18 274 from Blain, Jackson Township, to 19 Franklin County Line 820,000 20 (Base Project Allocation - $800,000) 21 (Design and Contingencies - $20,000) 22 (d) SR 849 23 (1) Resurface and Construct Shoulder from 24 Newport to SR 34 930,000 25 (Base Project Allocation - $900,000) 26 (Design and Contingencies - $30,000) 27 (e) SR 850 28 (1) Resurface and Construct Shoulder on SR 29 850 from Kistler to Juniata County 30 Line 570,000 19970S0185B2078 - 111 -
1 (Base Project Allocation - $520,000) 2 (Design and Contingencies - $50,000) 3 (2) Resurface and Construct Shoulder on SR 4 850 from SR 34 in Shermans Dale to 5 Village of Keystone 410,000 6 (Base Project Allocation - $400,000) 7 (Design and Contingencies - $10,000) 8 (F) US 322 <-- 9 (1) SUSQUEHANNA RIVER TO WEST OF 10 MILLERSTOWN, RESTORATION 28,000,000 11 (BASE PROJECT ALLOCATION - $25,000,000) 12 (LAND ALLOCATION - $500,000) 13 (DESIGN AND CONTINGENCIES - $2,500,000) 14 Section 351. Philadelphia County. 15 (a) I-76 16 (1) Route 1 to I-95, Pavement 17 Rehabilitation and Safety Improvements 1,000,000 18 (Base Project Allocation - $895,000) 19 (Land Allocation - $5,000) 20 (Design and Contingencies - $100,000) 21 (2) SCHUYLKILL RIVER TO MONTGOMERY AVENUE, <-- 22 PAVEMENT RESTORATION 7,100,000 23 (BASE PROJECT ALLOCATION - $7,000,000) 24 (DESIGN AND CONTINGENCIES - $100,000) 25 (3) FEASIBILITY STUDY FOR NEW ENTRANCE <-- 26 RAMP OR NEW EXIT RAMP, OR BOTH, WEST OF 27 MANAYUNK/BELMONT AVENUE, EXIT 31 125,000 28 (b) I-95 29 (1) Delaware County Line to Bucks County 30 Line, Pavement and Bridge 19970S0185B2078 - 112 -
1 Rehabilitation and Safety Improvements 26,440,000 2 (Base Project Allocation - $25,340,000) 3 (Land Allocation - $100,000) 4 (Design and Contingencies - $1,000,000) 5 (2) DELAWARE COUNTY LINE TO BUCKS COUNTY <-- 6 LINE, PAVEMENT REHABILITATION AND 7 SAFETY IMPROVEMENTS 2,000,000 8 (BASE PROJECT ALLOCATION - $1,790,000) 9 (LAND ALLOCATION - $10,000) 10 (DESIGN AND CONTINGENCIES - $200,000) 11 (3) (2) JACKSON STREET TO RITNER AVENUE, 12 200 BLOCK OF FRONT STREET, INSTALL 13 SAFETY/PROTECTIVE WALL 44,000 14 (BASE PROJECT ALLOCATION - $35,000) 15 (DESIGN AND CONTINGENCIES - $9,000) 16 (4) (3) RECONSTRUCTION OF BEACH STREET <-- 17 NORTH OF ALLEGHENY AVENUE AS AN 18 ALTERNATIVE ROUTE TO I-95 10,000,000 19 (5) (4) RECONSTRUCTION OF ROADWAY FROM <-- 20 LEWIS STREET NORTH TO BRIDGE STREET AS 21 ALTERNATIVE ROUTE TO I-95 25,000,000 22 (c) Germantown Avenue 23 (1) Reconstruct Germantown Avenue 7,500,000 24 (d) SR 1007 25 (1) Adams Avenue Connector, Torresdale to 26 Aramingo Avenue, New Roadway 376,000 27 (Base Project Allocation - $286,000) 28 (Land Allocation - $70,000) 29 (Design and Contingencies - $20,000) 30 (e) I-95 <-- 19970S0185B2078 - 113 -
1 (1) Jackson Street to Ritner Avenue, (200 2 Block of Front Street), Install 3 Safety/Protective Wall 44,000 4 (Base Project Allocation - $35,000) 5 (Design and Contingencies - $9,000) 6 (f) (E) Chestnut Street <-- 7 (1) Chestnut Street Intermodal Improvement 8 Project 4,367,000 9 (2) CHESTNUT STREET TRANSIT WAY <-- 10 RECONSTRUCTION 10,000,000 11 (F) I-676 12 (1) VINE EXPRESSWAY, TRANSPORTATION 13 INCIDENT MANAGEMENT SYSTEM 462,000 14 (BASE PROJECT ALLOCATION - $390,000) 15 (DESIGN AND CONTINGENCIES - $72,000) 16 (2) 15TH STREET TO 16TH STREET, CONSTRUCT <-- 17 PEDESTRIAN BRIDGE 250,000 18 (BASE PROJECT ALLOCATION - $200,000) 19 (LAND ALLOCATION - $25,000) 20 (DESIGN AND CONTINGENCIES - $25,000) 21 (G) SR 1001 22 (1) INTERSECTION OF RISING SUN AND ADAMS, 23 INTERSECTION IMPROVEMENTS, UPGRADE 24 SIGNALS AND WIDEN 175,000 25 (BASE PROJECT ALLOCATION - $134,000) 26 (LAND ALLOCATION - $5,000) 27 (DESIGN AND CONTINGENCIES - $36,000) 28 (H) SR 2009 29 (1) US 1 TO ALLEGHENY AVENUE, INTERSECTION 30 IMPROVEMENTS AND SIGNALS 371,000 19970S0185B2078 - 114 -
1 (BASE PROJECT ALLOCATION - $272,000) 2 (LAND ALLOCATION - $20,000) 3 (DESIGN AND CONTINGENCIES - $79,000) 4 (I) SR 676 5 (1) VINE STREET, PAVEMENT REHABILITATION 6 AND SAFETY IMPROVEMENTS 350,000 7 (BASE PROJECT ALLOCATION - $315,000) 8 (DESIGN AND CONTINGENCIES - $35,000) 9 (J) DELAWARE AVENUE 10 (1) CONSTRUCT ROADWAY EXTENSION BETWEEN 11 LEWIS STREET AND ORTHODOX STREET 1,200,000 12 (BASE PROJECT ALLOCATION - $1,040,000) 13 (LAND ALLOCATION - $130,000) 14 (DESIGN AND CONTINGENCIES - $130,000) 15 (K) ACCESS 16 (1) ACCESS IMPROVEMENTS TO FORMER 17 PHILADELPHIA NAVAL SHIPYARD AND BASE 500,000 18 (BASE PROJECT ALLOCATION - $400,000) 19 (LAND ALLOCATION - $50,000) 20 (DESIGN AND CONTINGENCIES - $50,000) 21 (L) SR 2001 <-- 22 (1) SECTION LEO, CITY OF PHILADELPHIA, 23 DELAWARE EXTENSION PROJECT, 24 CONSTRUCTION OF A 1.4 MILE FOUR-LANE 25 ROADWAY SECTION OF DELAWARE AVENUE 26 BEGINNING AT DYOTT STREET AND EXTENDING 27 NORTH TO AN INTERSECTION WITH ALLEGHENY 28 AVENUE 11,750,000 29 (BASE PROJECT ALLOCATION - $8,000,000) 30 (LAND ALLOCATION - $2,750,000) 19970S0185B2078 - 115 -
1 (DESIGN AND CONTINGENCIES - $1,000,000) 2 Section 352. Pike County (Reserved). 3 Section 353. Potter County. 4 (a) SR 2002 5 (1) Reconstruct to 22 Feet from Germania 6 Station to Galeton 2,595,000 7 (Base Project Allocation - $2,157,000) 8 (Land Allocation - $250,000) 9 (Design and Contingencies - $188,000) 10 (B) PA 449 <-- 11 (1) VILLAGE OF GOLD TO NEW YORK STATE 12 LINE, WIDEN AND PAVEMENT RESTORATION 760,000 13 (BASE PROJECT ALLOCATION - $700,000) 14 (LAND ALLOCATION - $20,000) 15 (DESIGN AND CONTINGENCIES - $40,000) 16 Section 354. Schuylkill County. 17 (a) I-81 18 (1) PA 25 to PA 54, Pavement 19 Rehabilitation and Safety Improvements 2,000,000 20 (Base Project Allocation - $1,790,000) 21 (Land Allocation - $10,000) 22 (Design and Contingencies - $200,000) 23 (2) PA 901 Interchange, Reconstruction 800,000 24 (Base Project Allocation - $716,000) 25 (Land Allocation - $4,000) 26 (Design and Contingencies - $80,000) 27 (3) SR 4007, Gordon Road, New Interchange 1,600,000 <-- 28 (Base Project Allocation - $1,432,000) 29 (Land Allocation - $8,000) 30 (Design and Contingencies - $160,000) 19970S0185B2078 - 116 -
1 (4) (3) Construction of a New Rest Area on 2 I-81 northbound in Foster Township 6,240,000 3 (Base Project Allocation - $3,900,000) 4 (Land Allocation - $1,475,000) 5 (Design and Contingencies - $865,000) 6 (5) (4) I-81, FOSTER, PAVEMENT <-- 7 RESTORATION 2,258,000 8 (BASE PROJECT ALLOCATION - $2,218,000) 9 (DESIGN AND CONTINGENCIES - $40,000) 10 (6) SR 4007, BUTLER TOWNSHIP, INTERCHANGE <-- 11 RECONSTRUCTION 28,000,000 12 (5) SR 4007, BUTLER TOWNSHIP, NEW <-- 13 INTERCHANGE CONSTRUCTION 28,000,000 14 (BASE PROJECT ALLOCATION - $25,000,000) 15 (LAND ALLOCATION - $1,000,000) 16 (DESIGN AND CONTINGENCIES - $2,000,000) 17 (b) SR 125 18 (1) Resurface and Reconstruct SR 125 from 19 SR 25 to Northumberland County Line 825,000 20 (Base Project Allocation - $750,000) 21 (Design and Contingencies - $75,000) 22 (c) SR 309 23 (1) Intersection Improvements with SR 443, 24 West Penn Township 2,050,000 25 (Base Project Allocation - $2,000,000) 26 (Land Allocation - $40,000) 27 (Design and Contingencies - $10,000) 28 (2) Corridor Study of SR 309 250,000 29 (Design and Contingencies - $250,000) 30 (3) Resurface SR 309 from West Penn 19970S0185B2078 - 117 -
1 Township line to T-503 in Tamaqua 2,500,000 2 (Base Project Allocation - $2,400,000) 3 (Design and Contingencies - $100,000) 4 (d) SR 61 5 (1) Resurface SR 61 from SR 183 to Mt. 6 Carbon Line in North Manheim Township 1,600,000 7 (Base Project Allocation - $1,520,000) 8 (Design and Contingencies - $80,000) 9 (2) Construct Median Barrier on SR 61 from 10 SR 183 to SR 2015 in North Manheim 11 Township 4,660,000 12 (Base Project Allocation - $3,800,000) 13 (Land Allocation - $650,000) 14 (Design and Contingencies - $210,000) 15 (3) Construction of Safety Improvements on 16 SR 61 from SR 2014 to SR 895 15,000,000 17 (Base Project Allocation - $8,000,000) 18 (Land Allocation - $5,500,000) 19 (Design and Contingencies - $1,500,000) 20 (4) PA 61, SURFACE WORK ON 4.6 MILES, <-- 21 PAVEMENT RESTORATION 1,700,000 22 (BASE PROJECT ALLOCATION - $1,600,000) 23 (DESIGN AND CONTINGENCIES - $100,000) 24 (e) SR 895 25 (1) Restoration of SR 895 from SR 183 to 26 South Manheim Township in Wayne 27 Township 1,125,000 28 (Base Project Allocation - $1,000,000) 29 (Land Allocation - $25,000) 30 (Design and Contingencies - $100,000) 19970S0185B2078 - 118 -
1 (f) SR 924 2 (1) Restoration of SR 924 in Vicinity of 3 Shenandoah Heights 1,687,000 4 (Base Project Allocation - $1,300,000) 5 (Land Allocation - $88,000) 6 (Design and Contingencies - $299,000) 7 Section 355. Snyder County. 8 (a) US 11/15 9 (1) Golden Strip, Monroe Township, Widen 10 Roadway and Improve the Intersections 11 From North of Selinsgrove Bypass to 12 Shamokin Dam Borough Line, Length 2.0 13 Miles 6,000,000 14 (Base Project Allocation - $5,300,000) 15 (Land Allocation - $500,000) 16 (Design and Contingencies - $200,000) 17 (2) MONROE TOWNSHIP TO SHAMOKIN DAM, WIDEN <-- 18 AND INTERSECTION IMPROVEMENTS 1,400,000 19 (BASE PROJECT ALLOCATION - $1,000,000) 20 (LAND ALLOCATION - $100,000) 21 (DESIGN AND CONTINGENCIES - $300,000) 22 (B) US 11 23 (1) SHAMOKIN DAM TO BLUE HILL BRIDGE, 24 WIDEN AND RECONSTRUCT ROADWAY 750,000 25 (BASE PROJECT ALLOCATION - $600,000) 26 (LAND ALLOCATION - $10,000) 27 (DESIGN AND CONTINGENCIES - $140,000) 28 Section 356. Somerset County. 29 (a) US 219 30 (1) Davidsville to US 30 Interchange, 19970S0185B2078 - 119 -
1 Pavement Restoration 1,740,000
2 (Base Project Allocation - $1,640,000)
3 (Design and Contingencies - $100,000)
4 (2) EAST SOMERSET AND SOMERSET TOWNSHIP, <--
5 PAVEMENT REHABILITATION AND SAFETY
6 IMPROVEMENTS 780,000
7 (BASE PROJECT ALLOCATION - $708,000)
8 (DESIGN AND CONTINGENCIES - $72,000)
9 (3) MEYERSDALE TO SOMERSET, PRELIMINARY
10 ENGINEERING 120,000
11 (BASE PROJECT ALLOCATION - $120,000)
12 (4) NORTH SOMERSET, QUEMAHONING TOWNSHIP,
13 PAVEMENT REHABILITATION AND SAFETY
14 IMPROVEMENTS 1,960,000
15 (BASE PROJECT ALLOCATION - $1,780,000)
16 (DESIGN AND CONTINGENCIES - $180,000)
17 (B) PA 56
18 (1) IMPROVEMENTS PHASE I, WINDBER TO
19 BEDFORD COUNTY LINE, RESTORATION 2,000,000
20 (BASE PROJECT ALLOCATION - $1,600,000)
21 (LAND ALLOCATION - $200,000)
22 (DESIGN AND CONTINGENCIES - $200,000)
23 Section 357. Sullivan County (Reserved). <--
24 SECTION 357. SULLIVAN COUNTY. <--
25 (A) SR 154
26 (1) ELKLAND TOWNSHIP, HIGHWAY
27 RECONSTRUCTION AND ROADWAY REALIGNMENT 350,000
28 (BASE PROJECT ALLOCATION - $300,000)
29 (LAND ALLOCATION - $20,000)
30 (DESIGN AND CONTINGENCIES - $30,000)
19970S0185B2078 - 120 -
1 (B) SR 87 2 (1) CHERRY TOWNSHIP, HIGHWAY 3 RECONSTRUCTION AND ROADWAY REALIGNMENT 280,000 4 (BASE PROJECT ALLOCATION - $200,000) 5 (LAND ALLOCATION - $40,000) 6 (DESIGN AND CONTINGENCIES - $40,000) 7 Section 358. Susquehanna County. 8 (a) I-81 9 (1) Lackawanna County Line to New York 10 State Line, Pavement Rehabilitation and 11 Safety Improvements 2,600,000 12 (Base Project Allocation - $2,327,000) 13 (Land Allocation - $13,000) 14 (Design and Contingencies - $260,000) 15 (B) US 11 <-- 16 (1) KINGSLEY TO HALLSTEAD, PAVEMENT 17 REHABILITATION AND SAFETY IMPROVEMENTS 900,000 18 (BASE PROJECT ALLOCATION - $600,000) 19 (DESIGN AND CONTINGENCIES - $300,000) 20 Section 359. Tioga County. 21 (a) US 15 22 (1) Bridge Spanning Tioga Dam, New Two- <-- 23 Lane Bridge 125,000 24 (Design and Contingencies - $125,000) 25 (1) BRIDGE SPANNING TIOGA DAM, NEW TWO- <-- 26 LANE BRIDGE 1,375,000 27 (BASE PROJECT ALLOCATION - $1,250,000) 28 (DESIGN AND CONTINGENCIES - $125,000) 29 (2) LAWRENCEVILLE BYPASS, TIOGA JUNCTION 30 TO NEW YORK STATE LINE, FOUR-LANE 19970S0185B2078 - 121 -
1 RELOCATION 7,193,000 2 (BASE PROJECT ALLOCATION - $6,000,000) 3 (LAND ALLOCATION - $533,000) 4 (DESIGN AND CONTINGENCIES - $660,000) 5 (3) NORTH OF MANSFIELD TO NORTH OF TIOGA, 6 ADD TWO LANES 10,224,000 7 (BASE PROJECT ALLOCATION - $9,160,000) 8 (LAND ALLOCATION - $100,000) 9 (DESIGN AND CONTINGENCIES - $964,000) 10 (B) US 6 11 (1) MAINSBURG TO BRADFORD COUNTY LINE, 12 RESTORATION 337,000 13 (BASE PROJECT ALLOCATION - $297,000) 14 (LAND ALLOCATION - $20,000) 15 (DESIGN AND CONTINGENCIES - $20,000) 16 (2) POTTER COUNTY LINE TO WELLSBORO, 17 PAVEMENT RESTORATION 600,000 18 (BASE PROJECT ALLOCATION - $300,000) 19 (LAND ALLOCATION - $150,000) 20 (DESIGN AND CONTINGENCIES - $150,000) 21 (C) PA 49 22 (1) EAST OF ELKLAND TO LAWRENCE TOWNSHIP 23 LINE, PAVEMENT RESTORATION AND SAFETY 24 IMPROVEMENTS 520,000 25 (BASE PROJECT ALLOCATION - $420,000) 26 (DESIGN AND CONTINGENCIES - $100,000) 27 (D) SR 6015 28 (1) MANSFIELD BYPASS, CANOE CAMP TO NORTH 29 OF MANSFIELD, TWO-LANE RELOCATION 5,900,000 30 (BASE PROJECT ALLOCATION - $5,000,000) 19970S0185B2078 - 122 -
1 (LAND ALLOCATION - $500,000) 2 (DESIGN AND CONTINGENCIES - $400,000) 3 (2) TIOGA JUNCTION, NORTH OF TIOGA, FOUR- 4 LANE RELOCATION 4,370,000 5 (BASE PROJECT ALLOCATION - $3,760,000) 6 (LAND ALLOCATION - $145,000) 7 (DESIGN AND CONTINGENCIES - $465,000) 8 Section 360. Union County. 9 (a) US 15 10 (1) Snyder/Union County Line to T-365, 11 Reconstruction and Safety Improvements 1,900,000 12 (Base Project Allocation - $1,600,000) 13 (Land Allocation - $100,000) 14 (Design and Contingencies - $200,000) 15 Section 361. Venango County (Reserved). <-- 16 Section 362. Warren County (Reserved). 17 (2) LEWISBURG TO NEW COLUMBIA, <-- 18 RESTORATION 1,000,000 19 (BASE PROJECT ALLOCATION - $960,000) 20 (LAND ALLOCATION - $20,000) 21 (DESIGN AND CONTINGENCIES - $20,000) 22 (B) I-80 23 (1) CLINTON COUNTY LINE TO SR 1010 BRIDGE, 24 DIAMOND GRINDING 279,000 25 (BASE PROJECT ALLOCATION - $79,000) 26 (LAND ALLOCATION - $100,000) 27 (DESIGN AND CONTINGENCIES - $100,000) 28 (2) WESTBOUND FROM US 15 TO SR 1010, 29 PAVEMENT RESTORATION 6,100,000 30 (BASE PROJECT ALLOCATION - $6,000,000) 19970S0185B2078 - 123 -
1 (DESIGN AND CONTINGENCIES - $100,000) 2 (3) WEST OF EXIT 30 TO WEST OF EXIT 31, 3 PAVEMENT REHABILITATION AND SAFETY 4 IMPROVEMENTS 5,070,000 5 (BASE PROJECT ALLOCATION - $4,800,000) 6 (DESIGN AND CONTINGENCIES - $270,000) 7 SECTION 361. VENANGO COUNTY. 8 (A) PA 8 9 (1) RYND HILL ROAD TO CHERRYTREE, CORRIDOR 10 IMPROVEMENTS 1,240,000 11 (BASE PROJECT ALLOCATION - $840,000) 12 (LAND ALLOCATION - $200,000) 13 (DESIGN AND CONTINGENCIES - $200,000) 14 (2) CROSS CREEK ENTRANCE NORTH, <-- 15 RECONSTRUCTION AND SAFETY IMPROVEMENTS 2,000,000 16 (BASE PROJECT ALLOCATION - $1,800,000) 17 (DESIGN AND CONTINGENCIES - $200,000) 18 (3) INTERSECTION WITH SR 417, INTERSECTION 19 IMPROVEMENTS 2,000,000 20 (BASE PROJECT ALLOCATION - $1,800,000) 21 (DESIGN AND CONTINGENCIES - $200,000) 22 (4) INTERSECTION WITH DRAKE WELL ROAD, 23 SIGNALIZATION AND INTERSECTION 24 IMPROVEMENTS 500,000 25 (BASE PROJECT ALLOCATION - $450,000) 26 (DESIGN AND CONTINGENCIES - $50,000) 27 (5) ROUTE 8, FRANKLIN BY-PASS 2,900,000 28 (BASE PROJECT ALLOCATION - $2,600,000) 29 (DESIGN AND CONTINGENCIES - $300,000) 30 (B) PA 257 19970S0185B2078 - 124 -
1 (1) TOP OF SENECA HILL TO TR 322, ADD 2 LANES 1,600,000 3 (BASE PROJECT ALLOCATION - $1,200,000) 4 (LAND ALLOCATION - $200,000) 5 (DESIGN AND CONTINGENCIES - $200,000) 6 (C) US 322 7 (1) SR 257 TO TR 38, TWO-LANE 8 RECONSTRUCTION 1,344,000 9 (BASE PROJECT ALLOCATION - $1,172,000) 10 (LAND ALLOCATION - $70,000) 11 (DESIGN AND CONTINGENCIES - $102,000) 12 (2) CRANBERRY TO ROUTE 38, RECONSTRUCTION <-- 13 AND PARTIAL RELOCATION 6,400,000 14 (BASE PROJECT ALLOCATION - $5,760,000) 15 (DESIGN AND CONTINGENCIES - $640,000) 16 (D) PA 257 17 (1) CRANBERRY TO I-80, EXTENSION OF PA 18 257 2,400,000 19 (BASE PROJECT ALLOCATION - $2,160,000) 20 (DESIGN AND CONTINGENCIES - $240,000) 21 (E) I-80 22 (1) INTERCHANGE AT LISBON 3,100,000 23 (BASE PROJECT ALLOCATION - $2,790,000) 24 (DESIGN AND CONTINGENCIES - $310,000) 25 SECTION 362. WARREN COUNTY. 26 (A) SR 957 27 (1) RECONSTRUCTION OF INTERSECTION OF SR 28 957 WITH CENTER ROAD AND KIRAN HILL 29 ROAD 200,000 30 (2) INTERSECTION AT SR 4007 IN COLUMBUS 19970S0185B2078 - 125 -
1 TOWNSHIP, INTERSECTION IMPROVEMENTS 330,000 2 (BASE PROJECT ALLOCATION - $250,000) 3 (LAND ALLOCATION - $30,000) 4 (DESIGN AND CONTINGENCIES - $50,000) 5 (B) US 6 6 (1) WARREN SLIDE AREA IN WARREN TOWNSHIP 7 AND CONEWAGO TOWNSHIP, PAVEMENT 8 REHABILITATION AND SAFETY IMPROVEMENTS 1,700,000 9 (BASE PROJECT ALLOCATION - $1,500,000) 10 (DESIGN AND CONTINGENCIES - $200,000) 11 (2) WEST OF YANKEE BUSH ROAD TO T-492, 12 WIDEN AND RECONSTRUCT 570,000 13 (BASE PROJECT ALLOCATION - $550,000) 14 (LAND ALLOCATION - $5,000) 15 (DESIGN AND CONTINGENCIES - $15,000) 16 (3) YOUNGSVILLE TO WARREN, PAVEMENT 17 REHABILITATION AND SAFETY IMPROVEMENTS 3,100,000 18 (BASE PROJECT ALLOCATION - $3,000,000) 19 (DESIGN AND CONTINGENCIES - $100,000) 20 (C) SR 6 21 (1) T-492 TO WARREN, PAVEMENT 22 REHABILITATION AND SAFETY IMPROVEMENTS 1,240,000 23 (BASE PROJECT ALLOCATION - $1,200,000) 24 (LAND ALLOCATION - $20,000) 25 (DESIGN AND CONTINGENCIES - $20,000) 26 (D) SR 62 27 (1) TIDIOUTE TO IRVINE, PAVEMENT 28 RESTORATION, SLIDE CORRECTION AND 29 SAFETY IMPROVEMENTS 1,000,000 30 (BASE PROJECT ALLOCATION - $800,000) 19970S0185B2078 - 126 -
1 (LAND ALLOCATION - $100,000)
2 (DESIGN AND CONTINGENCIES - $100,000)
3 Section 363. Washington County.
4 (a) I-70
5 (1) PA 481 to Westmoreland County Line,
6 Pavement Rehabilitation and Safety
7 Improvements 600,000
8 (Base Project Allocation - $537,000)
9 (Land Allocation - $3,000)
10 (Design and Contingencies - $60,000)
11 (2) I-79 TO PA 519, PAVEMENT RESTORATION 3,200,000 <--
12 (BASE PROJECT ALLOCATION - $3,100,000)
13 (DESIGN AND CONTINGENCIES - $100,000)
14 (3) KAMMERER TO PA 519, PAVEMENT
15 RESTORATION 3,100,000
16 (BASE PROJECT ALLOCATION - $3,000,000)
17 (DESIGN AND CONTINGENCIES - $100,000)
18 (4) WEST VIRGINIA LINE TO EXIT 1,
19 RECONSTRUCTION AND SAFETY IMPROVEMENTS 420,000
20 (BASE PROJECT ALLOCATION - $400,000)
21 (LAND ALLOCATION - $10,000)
22 (DESIGN AND CONTINGENCIES - $10,000)
23 (b) I-79
24 (1) Greene, Washington, Allegheny, Butler,
25 Lawrence, Mercer, Crawford and Erie
26 County Lines, West Virginia to I-90,
27 Intelligent Transportation Systems
28 Study 75,000
29 (Design and Contingencies - $75,000)
30 (2) Greene County Line to Milepost 48 I- <--
19970S0185B2078 - 127 -
1 70, Pavement Rehabilitation and Safety 2 Improvements 2,500,000 3 (Base Project Allocation - $2,237,000) 4 (Land Allocation - $13,000) 5 (Design and Contingencies - $250,000) 6 (3) Milepost 39.4 to Milepost 42, 7 Meadowlands Area, Resurfacing 240,000 8 (Base Project Allocation - $220,000) 9 (Design and Contingencies - $20,000) 10 (4) MARIANNA TO US 40, RECONSTRUCTION AND <-- 11 SAFETY IMPROVEMENTS 3,020,000 12 (BASE PROJECT ALLOCATION - $3,000,000) 13 (LAND ALLOCATION - $10,000) 14 (DESIGN AND CONTINGENCIES - $10,000) 15 (5) SOUTH STRABANE TOWNSHIP, PAVEMENT 16 REHABILITATION AND SAFETY IMPROVEMENTS 1,080,000 17 (BASE PROJECT ALLOCATION - $1,030,000) 18 (DESIGN AND CONTINGENCIES - $50,000) 19 (C) PA 837 20 (1) HUSTON TO COURTNEY, RECONSTRUCTION 1,000,000 21 (BASE PROJECT ALLOCATION - $930,000) 22 (LAND ALLOCATION - $20,000) 23 (DESIGN AND CONTINGENCIES - $50,000) 24 (D) SR 1002 25 (1) MCMURRAY AND VALLEYBROOK INTERSECTION, 26 PETERS TOWNSHIP, INTERSECTION 27 IMPROVEMENTS 760,000 28 (BASE PROJECT ALLOCATION - $760,000) 29 (E) SR 0000 30 (1) CONSTRUCT NEW ROAD CONNECTING SR 3013, 19970S0185B2078 - 128 -
1 FRANKLIN FARMS ROAD, TO SR 18 IN NORTH 2 FRANKLIN TOWNSHIP, WASHINGTON COUNTY 1,096,000 3 (BASE PROJECT ALLOCATION - $866,000) 4 (LAND ALLOCATION - $100,000) 5 (DESIGN AND CONTINGENCIES - $130,000) 6 (F) CALIFORNIA UNIVERSITY OF PENNSYLVANIA <-- 7 (1) CONSTRUCT INTERMODAL FACILITY 250,000 8 (BASE PROJECT ALLOCATION - $200,000) 9 (LAND ALLOCATION - $25,000) 10 (DESIGN AND CONTINGENCIES - $25,000) 11 Section 364. Wayne County. 12 (a) I-84 13 (1) Lackawanna County Line to Pike County 14 Line, Pavement Rehabilitation and 15 Safety Improvements 600,000 16 (Base Project Allocation - $537,000) 17 (Land Allocation - $3,000) 18 (Design and Contingencies - $60,000) 19 Section 365. Westmoreland County. 20 (a) I-70 21 (1) Washington County Line to I-76, 22 Pavement Rehabilitation and Safety 23 Improvements 1,700,000 24 (Base Project Allocation - $1,521,000) 25 (Land Allocation - $9,000) 26 (Design and Contingencies - $170,000) 27 (2) NORTH BELLE VERNON TO SR 201, <-- 28 RECONSTRUCTION AND SAFETY IMPROVEMENTS 470,000 29 (BASE PROJECT ALLOCATION - $450,000) 30 (LAND ALLOCATION - $10,000) 19970S0185B2078 - 129 -
1 (DESIGN AND CONTINGENCIES - $10,000)
2 (b) SR 3111
3 (1) Center Avenue, Borough of New Stanton,
4 Two-Lane Relocation 940,000
5 (Base Project Allocation - $700,000)
6 (Land Allocation - $40,000)
7 (Design and Contingencies - $200,000)
8 (c) SR 982
9 (1) Reconstruction of SR 982, Including
10 Climbing Lanes from Laurelville, Mt.
11 Pleasant Township, to Intersection with
12 SR 31 in Fayette County 6,500,000
13 (Base Project Allocation - $5,000,000)
14 (Land Allocation - $500,000)
15 (Design and Contingencies - $1,000,000)
16 (d) SR 356
17 (1) Reconstruction of SR 356, Including
18 Widening, Overlay, and Safety
19 Improvements 3,000,000
20 (Base Project Allocation - $2,500,000)
21 (Land Allocation - $100,000)
22 (Design and Contingencies - $400,000)
23 (E) US 30 <--
24 (1) GEORGES' STATION ROAD TO MT. VIEW,
25 PAVEMENT RESTORATION AND SAFETY
26 IMPROVEMENTS 840,000
27 (BASE PROJECT ALLOCATION - $800,000)
28 (LAND ALLOCATION - $20,000)
29 (DESIGN AND CONTINGENCIES - $20,000)
30 (2) BEATTY CROSSROADS TO PA 981, PAVEMENT <--
19970S0185B2078 - 130 -
1 RESTORATION AND SAFETY IMPROVEMENTS 920,000 2 (BASE PROJECT ALLOCATION - $880,000) 3 (LAND ALLOCATION - $20,000) 4 (DESIGN AND CONTINGENCIES - $20,000) 5 (3) (2) BEATTY TO PA 981, PAVEMENT 6 RESTORATION 4,600,000 7 (BASE PROJECT ALLOCATION - $4,500,000) 8 (DESIGN AND CONTINGENCIES - $100,000) 9 (4) (3) PA 981 TO KINGSTON, PAVEMENT <-- 10 RESTORATION 3,200,000 11 (BASE PROJECT ALLOCATION - $3,100,000) 12 (DESIGN AND CONTINGENCIES - $100,000) 13 (F) US 119 14 (1) MT. PLEASANT TO SOUTH OF YOUNGWOOD 15 INTERCHANGE, PAVEMENT REHABILITATION 16 AND SAFETY IMPROVEMENTS 4,040,000 17 (BASE PROJECT ALLOCATION - $4,000,000) 18 (LAND ALLOCATION - $20,000) 19 (DESIGN AND CONTINGENCIES - $20,000) 20 (2) MT. PLEASANT AND SCOTTDALE 21 INTERCHANGE, INTERCHANGE IMPROVEMENTS 1,400,000 22 (BASE PROJECT ALLOCATION - $1,000,000) 23 (LAND ALLOCATION - $200,000) 24 (DESIGN AND CONTINGENCIES - $200,000) 25 (3) NEW STANTON PARK AND RIDE, PARKING LOT 26 AND LIGHTING 140,000 27 (BASE PROJECT ALLOCATION - $80,000) 28 (LAND ALLOCATION - $40,000) 29 (DESIGN AND CONTINGENCIES - $20,000) 30 (G) PA 56 19970S0185B2078 - 131 -
1 (1) CAMBRIA COUNTY LINE TO INDIANA COUNTY
2 LINE, ROADWAY REALIGNMENT AND
3 RECONSTRUCTION 7,400,000
4 (BASE PROJECT ALLOCATION - $5,500,000)
5 (LAND ALLOCATION - $900,000)
6 (DESIGN AND CONTINGENCIES - $1,000,000)
7 (H) PA 906
8 (1) BELLE VERNON TO ROSTRAVER, PAVEMENT
9 RESTORATION AND SAFETY IMPROVEMENTS 440,000
10 (BASE PROJECT ALLOCATION - $400,000)
11 (LAND ALLOCATION - $20,000)
12 (DESIGN AND CONTINGENCIES - $20,000)
13 Section 366. Wyoming County (Reserved). <--
14 SECTION 366. WYOMING COUNTY. <--
15 (A) US 6
16 (1) BRADFORD TO MESHOPPEN, PAVEMENT
17 REHABILITATION AND SAFETY IMPROVEMENTS 574,000
18 (BASE PROJECT ALLOCATION - $324,000)
19 (DESIGN AND CONTINGENCIES - $250,000)
20 (2) MESHOPPEN TO RUSSELL HILL, PAVEMENT
21 REHABILITATION AND SAFETY IMPROVEMENTS 438,000
22 (BASE PROJECT ALLOCATION - $238,000)
23 (DESIGN AND CONTINGENCIES - $200,000)
24 Section 367. York County.
25 (a) I-83
26 (1) US 30 TO MARYLAND STATE LINE, PAVEMENT <--
27 REHABILITATION AND SAFETY IMPROVEMENTS 4,000,000
28 (BASE PROJECT ALLOCATION - $3,580,000)
29 (LAND ALLOCATION - $20,000)
30 (DESIGN AND CONTINGENCIES - $400,000)
19970S0185B2078 - 132 -
1 (1) (2) Feasibility Study for New Exit at <--
2 Windy Hill Road, New Freedom Borough 100,000
3 (Design and Contingencies - $100,000)
4 (3) LEADER HEIGHTS TO GEORGE STREET, <--
5 PAVEMENT REHABILITATION AND SAFETY
6 IMPROVEMENTS 468,000
7 (BASE PROJECT ALLOCATION - $437,000)
8 (LAND ALLOCATION - $1,000)
9 (DESIGN AND CONTINGENCIES - $30,000)
10 (4) I-83 BUSINESS ROUTE, I-83 TO YORK,
11 RESTORATION 8,800,000
12 (BASE PROJECT ALLOCATION - $8,000,000)
13 (LAND ALLOCATION - $200,000)
14 (DESIGN AND CONTINGENCIES - $600,000)
15 (5) INTERCHANGE WITH PA 114, ROADWAY
16 STRUCTURE, RAMP IMPROVEMENTS AND
17 SIGNALIZATION 1,806,000
18 (BASE PROJECT ALLOCATION - $1,560,000)
19 (LAND ALLOCATION - $122,000)
20 (DESIGN AND CONTINGENCIES - $124,000)
21 (6) INTERCHANGE WITH SR 0921, CONSTRUCT
22 NEW INTERCHANGE WITH CANAL ROAD IN EAST
23 MANCHESTER TOWNSHIP 30,800,000
24 (BASE PROJECT ALLOCATION - $30,000,000)
25 (LAND ALLOCATION - $500,000)
26 (DESIGN AND CONTINGENCIES - $300,000)
27 (7) EXIT 7 AND PROSPECT ROAD, <--
28 IMPROVEMENTS 1,500,000
29 (BASE PROJECT ALLOCATION - $1,350,000)
30 (DESIGN AND CONTINGENCIES - $150,000)
19970S0185B2078 - 133 -
1 (b) SR 74 2 (1) Reconstruction of SR 74 from Red Lion 3 to Intersection with SR 2054 1,600,000 4 (Base Project Allocation - $1,500,000) 5 (Design and Contingencies - $100,000) 6 (c) SR 3072 7 (1) Widen SR 3072 to Three Lanes, Hanover 8 Borough 200,000 9 (Base Project Allocation - $100,000) 10 (Land Allocation - $50,000) 11 (Design and Contingencies - $50,000) 12 (d) SR 4001 13 (1) Widen SR 4001 to Four Lanes from US 30 14 to Church Road 4,105,000 15 (Base Project Allocation - $3,476,000) 16 (Land Allocation - $296,000) 17 (Design and Contingencies - $333,000) 18 (e) SR 0182 19 (1) Lane Addition, Pine Grove Road to 20 Powder Mill Road 1,570,000 21 (F) SR 94 <-- 22 (1) WIDEN AND CONSTRUCTION OF SAFETY AND 23 OPERATIONAL IMPROVEMENTS ON SR 94 IN 24 YORK COUNTY AND ADAMS COUNTY 2,129,000 25 (BASE PROJECT ALLOCATION - $1,744,000) 26 (LAND ALLOCATION - $45,000) 27 (DESIGN AND CONTINGENCIES - $340,000) 28 (2) CONSTRUCTION OF INTERSECTION 29 IMPROVEMENTS WITH SR 194 AND SR 116 IN 30 HANOVER BOROUGH 2,000,000 19970S0185B2078 - 134 -
1 (G) PA 194 2 (1) HANOVER BOROUGH AND PENN TOWNSHIP, 3 INTERSECTION REALIGNMENT 76,000 4 (BASE PROJECT ALLOCATION - $60,000) 5 (LAND ALLOCATION - $4,000) 6 (DESIGN AND CONTINGENCIES - $12,000) 7 (H) US 15 8 (1) PA 94 TO DILLSBURG, PAVEMENT 9 RESTORATION 800,000 10 (BASE PROJECT ALLOCATION - $700,000) 11 (DESIGN AND CONTINGENCIES - $100,000) 12 (2) PREVENTIVE MAINTENANCE IN YORK COUNTY 13 AND ADAMS COUNTY INCLUDING BRIDGE 14 REHABILITATIONS, PAVEMENT 15 REHABILITATIONS AND SAFETY 16 IMPROVEMENTS 2,751,000 17 (BASE PROJECT ALLOCATION - $2,631,000) 18 (DESIGN AND CONTINGENCIES - $120,000) 19 (I) US 30 20 (1) HALLAM TO SUSQUEHANNA RIVER, PAVEMENT 21 RESTORATION 2,600,000 22 (BASE PROJECT ALLOCATION - $2,500,000) 23 (DESIGN AND CONTINGENCIES - $100,000) 24 (J) RAIL FREIGHT FACILITY 25 (1) CONSTRUCT INTERMODAL RAIL FREIGHT 26 FACILITY 2,200,000 27 (BASE PROJECT ALLOCATION - $1,500,000) 28 (LAND ALLOCATION - $300,000) 29 (DESIGN AND CONTINGENCIES - $400,000) 30 (K) PA 851 <-- 19970S0185B2078 - 135 -
1 (1) DELTA TO FAWN GROVE BOROUGH, SAFETY 2 IMPROVEMENTS 2,000,000 3 (BASE PROJECT ALLOCATION - $1,800,000) 4 (DESIGN AND CONTINGENCIES - $200,000) 5 Section 368. Statewide Wetland Mitigation. 6 (a) Statewide 7 (1) Construction of Advanced Wetland 8 Mitigation Projects Necessary to 9 Replace Wetlands Displaced by Highway 10 Projects 1,000,000 11 (Base Project Allocation - $800,000) 12 (Land Allocation - $100,000) 13 (Design and Contingencies - $100,000) 14 (2) INSTALLATION OF SECURITY WALLS AT <-- 15 VARIOUS LOCATIONS AS PILOT PROJECT 16 UNDER SECTION 801 OF THE ACT OF APRIL 17 22, 1998 (P.L. , NO.6A), KNOWN AS THE 18 GENERAL APPROPRIATION ACT OF 1998 15,000,000 19 (3) ACQUISITION AND INSTALLATION OF 20 CONSTANT WARNING TIME DEVICES FOR THE 21 UPGRADE AND SAFETY IMPROVEMENT OF 22 HIGHWAY-RAIL GRADE CROSSINGS. TWENTY 23 PERCENT OF THE COST OF EACH SUCH 24 ACQUISITION AND INSTALLATION SHALL BE 25 PAID BY THE RAILROAD THAT OWNS THE 26 TRACK UPON WHICH THE IMPROVEMENTS ARE 27 BEING INSTALLED 10,000,000 28 (4) INFRASTRUCTURE BANK 850,000 29 (BASE PROJECT ALLOCATION - $850,000) 30 (5) INTELLIGENT TRANSPORTATION SYSTEMS 19970S0185B2078 - 136 -
1 STUDIES ON VARIOUS ROUTES 800,000 2 (DESIGN AND CONTINGENCIES - $800,000) 3 CHAPTER 4 <-- 4 TRANSFER OF TOWNSHIP ROAD 5 SECTION 401. TRANSFER OF TOWNSHIP ROAD. 6 FROM AND AFTER THE EFFECTIVE DATE OF THIS ACT, THERE IS 7 HEREBY TRANSFERRED TO AND THE COMMONWEALTH OF PENNSYLVANIA SHALL 8 BE RESPONSIBLE FOR THE CONTROL, REPAIR, RECONSTRUCTION, 9 MAINTENANCE AND LIABILITY ARISING ON THE FOLLOWING TOWNSHIP ROAD 10 IN ELK COUNTY: 11 (1) T-520 FROM THE BEGINNING POINT ON SR 555 IN <-- 12 BENEZETTE TOWNSHIP TO THE ENDING POINT ON SR 555 IN BENEZETTE 13 TOWNSHIP. 14 (2) (1) T-647 FROM THE BEGINNING POINT ON SR 255 IN JAY 15 TOWNSHIP TO THE ENDING POINT ON SR 555 IN JAY TOWNSHIP. 16 CHAPTER 5 17 MISCELLANEOUS PROVISIONS 18 Section 501. Federal funds. 19 All moneys received from the Federal Government for the 20 construction of the projects specifically itemized in this act 21 are also hereby appropriated for those projects. 22 Section 502. Allocation of funds. 23 Whenever as determined by the Department of Transportation 24 that the full estimated financial costs of the projects itemized 25 in this act are not necessary for the proper design, acquisition 26 or construction of such projects, the excess funds no longer 27 required may be allocated by the Pennsylvania Department of 28 Transportation to increase the estimated costs of any one or 29 more of the projects specifically itemized in a capital budget. 30 Section 503. Estimated useful life. 19970S0185B2078 - 137 -
1 The General Assembly states that the estimated useful life of
2 the highway capital projects itemized in this act is 30 years.
3 SECTION 504. USE OF EXISTING FUNDS. <--
4 THE SUM OF $90,000,000 FOR THE I-95 AND PHILADELPHIA
5 INTERNATIONAL AIRPORT INTERCHANGE AND ACCESS IMPROVEMENTS
6 PROJECT IN DELAWARE COUNTY IN SECTION 323(O)(2) MAY BE PROVIDED
7 FROM BOND FUNDS AUTHORIZED IN PREVIOUS HIGHWAY CAPITAL BUDGETS.
8 Section 504 505. Effective date. <--
9 This act shall take effect immediately.
L27L72WMB/19970S0185B2078 - 138 -