See other bills
under the
same topic
                                                       PRINTER'S NO. 179

THE GENERAL ASSEMBLY OF PENNSYLVANIA


SENATE BILL

No. 186 Session of 1997


        INTRODUCED BY CORMAN AND STOUT, JANUARY 23, 1997

        REFERRED TO TRANSPORTATION, JANUARY 23, 1997

                                  A SUPPLEMENT

     1  To the act of December 8, 1982 (P.L.848, No.235), entitled "An
     2     act providing for the adoption of capital projects related to
     3     the repair, rehabilitation or replacement of highway bridges
     4     to be financed from current revenue or by the incurring of
     5     debt and capital projects related to highway and safety
     6     improvement projects to be financed from current revenue of
     7     the Motor License Fund," itemizing additional local and State
     8     bridge projects.

     9     The General Assembly of the Commonwealth of Pennsylvania
    10  hereby enacts as follows:
    11  Section 1.  Short title.
    12     This act shall be known and may be cited as the Highway-
    13  Railroad and Highway Bridge Capital Budget Supplemental Act for
    14  1995-1996.
    15  Section 2.  Definitions.
    16     The following words and phrases when used in this act shall
    17  have the meanings given to them in this section unless the
    18  context clearly indicates otherwise:
    19     "Account."  The Highway Bridge Improvement Restricted Account
    20  within the Motor License Fund.


     1     "Capital project."  A capital project as defined in section
     2  1602-B of the act of April 9, 1929 (P.L.343, No.176), known as
     3  The Fiscal Code, and shall include a county or municipal bridge
     4  rehabilitation, replacement or improvement project as set forth
     5  in this act.
     6     "Department."  The Department of Transportation of the
     7  Commonwealth.
     8     "Secretary."  The Secretary of Transportation of the
     9  Commonwealth.
    10  Section 3.  Total authorization for bridge projects.
    11     (a)  Total projects.--The total authorization for the costs
    12  of the projects itemized pursuant to this act and to be financed
    13  from current revenue or by the incurring of debt shall be
    14  $1,094,813,000.
    15     (b)  State projects.--The authorization for capital projects
    16  in the category of highway projects to be constructed by the
    17  Department of Transportation, its successors or assigns, and to
    18  be financed by the incurring of debt or from the highway
    19  account, itemized in this act under the category of State
    20  bridges, shall be $834,398,000.
    21     (c)  Non-State projects.--The authorization for non-State
    22  highway bridge projects to be constructed by municipalities and
    23  to be financed in part with grants not exceeding 80% of the non-
    24  Federal share of the costs made to the local government
    25  municipalities by the department from revenues deposited in the
    26  account itemized in this act under the category of local
    27  bridges, shall be $260,415,000.
    28  Section 4.  Itemization of bridge projects.
    29     The individual capital projects in the category of highway
    30  projects to be constructed by the Department of Transportation,
    19970S0186B0179                  - 2 -

     1  its successors or assigns, and to be financed from current
     2  revenue or by the incurring of debt are hereby itemized,
     3  together with their estimated financial costs, in the following
     4  sections.
     5  Section 5.  Adams County.
     6     (a)  Local Bridges
     7         (1)  Cumberland Township, T-338, Herr's
     8             Ridge Road Bridge over Willoughby Run,
     9             Bridge Rehabilitation                         170,000
    10             (Base Construction Allocation -
    11             $100,000)
    12             (Land Allocation - $10,000)
    13             (Design and Contingencies - $60,000)
    14         (2)  Cumberland Township, T-402, Horner
    15             Road Bridge over Marsh Creek, County
    16             Bridge No.111, Bridge Replacement           1,075,000
    17             (Base Construction Allocation -
    18             $725,000)
    19             (Land Allocation - $25,000)
    20             (Design and Contingencies - $325,000)
    21         (3)  Cumberland Township, T-417, Goulden
    22             Road Bridge over Rock Creek, County
    23             Bridge No.123, Bridge Rehabilitation          330,000
    24             (Base Construction Allocation -
    25             $250,000)
    26             (Land Allocation - $5,000)
    27             (Design and Contingencies - $75,000)
    28         (4)  Cumberland and Freedom Townships,
    29             Sach's Mill Covered Bridge over Marsh
    30             Creek, Pedestrian Bridge, Bridge
    19970S0186B0179                  - 3 -

     1             Rehabilitation                                600,000
     2             (Base Construction Allocation -
     3             $500,000)
     4             Design and Contingencies - $100,000
     5     (b)  State Bridges (Reserved)
     6  Section 6.  Allegheny County.
     7     (a)  Local Bridges
     8         (1)  Plum Borough, Mary Street Bridge over
     9             Plum Creek, Bridge Replacement                630,000
    10             (Base Construction Allocation -
    11             $400,000)
    12             (Land Allocation - $50,000)
    13             (Design and Contingencies - $180,000)
    14         (2)  City of Pittsburgh, Glenwood Bridge,
    15             Phase II over Monongahela River, Three
    16             Railroads and Carson Street, Bridge
    17             Rehabilitation                              4,180,000
    18             (Base Construction Allocation -
    19             $3,905,000)
    20             (Design and Contingencies - $275,000)
    21         (3)  Elizabeth Township, Patterson Road,
    22             Boyd Hollow Bridge, Bridge Replacement        225,000
    23             (Base Construction Allocation -
    24             $180,000)
    25             (Land Allocation - $11,000)
    26             (Design and Contingencies - $34,000)
    27         (4)  Elizabeth Township, Yates Street
    28             Bridge, Bridge Replacement                    198,000
    29             (Base Construction Allocation -
    30             $158,000)
    19970S0186B0179                  - 4 -

     1             (Land Allocation - $10,000)
     2             (Design and Contingencies - $30,000)
     3         (5)  Shaler Township, South of Martha
     4             Avenue, Anderson Road over Wible Run,
     5             Bridge Replacement                            500,000
     6             (Base Construction Allocation -
     7             $400,000)
     8             (Design and Contingencies - $100,000)
     9         (6)  Baldwin Borough, Old Clairton Road
    10             over CSX Railroad, Bridge
    11             Rehabilitation                                 80,000
    12             (Base Construction Allocation -
    13             $65,000)
    14             (Design and Contingencies - $15,000)
    15         (7)  Ben Avon Borough, Spruce Run Road over
    16             Spruce Run, Bridge Rehabilitation             265,000
    17             (Base Construction Allocation -
    18             $200,000)
    19             (Land Allocation - $5,000)
    20             (Design and Contingencies - $60,000)
    21         (8)  City of Pittsburgh, Swinburne Street,
    22             Bridge Painting                             1,530,000
    23             (Base Construction Allocation -
    24             $1,500,000)
    25             (Design and Contingencies - $30,000)
    26         (9)  City of Pittsburgh, Railroad Bridge
    27             (Hot Metal Bridge) at Former LTV Steel
    28             Company over Monongahela River, Bridge
    29             Rehabilitation                             25,000,000
    30             (Base Construction Allocation -
    19970S0186B0179                  - 5 -

     1             $22,500,000)
     2             (Design and Contingencies - $2,500,000)
     3         (10)  Edgeworth Borough, Beaver Street over
     4             Little Sewickley Creek, Bridge
     5             Replacement                                   358,000
     6             (Base Construction Allocation -
     7             $250,000)
     8             (Land Allocation - $8,000)
     9             (Design and Contingencies - $100,000)
    10         (11)  Forward Township, Pangburn Hollow
    11             Road over Pangburn Run, Bridge
    12             Replacement                                   200,000
    13             (Base Construction Allocation -
    14             $150,000)
    15             (Land Allocation - $10,000)
    16             (Design and Contingencies - $40,000)
    17         (12)  Hampton Township, Duncan Avenue over
    18             Pine Creek, Bridge Replacement                200,000
    19             (Base Construction Allocation -
    20             $150,000)
    21             (Land Allocation - $10,000)
    22             (Design and Contingencies - $40,000)
    23         (13)  Harrison Township, Natrona Road over
    24             Small Branch of Allegheny River, Bridge
    25             Rehabilitation                                210,000
    26             (Base Construction Allocation -
    27             $160,000)
    28             (Land Allocation - $10,000)
    29             (Design and Contingencies - $40,000)
    30         (14)  Jefferson Borough, Coal Valley Road
    19970S0186B0179                  - 6 -

     1             Bridge No.2 over McRoberts Run, Bridge
     2             Rehabilitation                                200,000
     3             (Base Construction Allocation -
     4             $150,000)
     5             (Land Allocation - $10,000)
     6             (Design and Contingencies - $40,000)
     7         (15)  Jefferson Borough, Coal Valley Road
     8             Bridge No.4 over McRoberts Run, Bridge
     9             Rehabilitation                                200,000
    10             (Base Construction Allocation -
    11             $150,000)
    12             (Land Allocation - $10,000)
    13             (Design and Contingencies - $40,000)
    14         (16)  Leetsdale Borough, Beaver Road over
    15             Big Sewickley Creek, Bridge
    16             Replacement                                   420,000
    17             (Base Construction Allocation -
    18             $300,000)
    19             (Land Allocation - $10,000)
    20             (Design and Contingencies - $110,000)
    21         (17)  Municipality of Penn Hills, Mt.
    22             Carmel Road over Sandy Creek, Bridge
    23             Replacement                                   230,000
    24             (Base Construction Allocation -
    25             $170,000)
    26             (Land Allocation - $10,000)
    27             (Design and Contingencies - $50,000)
    28         (18)  Municipality of Penn Hills, Lincoln
    29             Road Bridge No.6 over Sandy Creek,
    30             Bridge Replacement                            215,000
    19970S0186B0179                  - 7 -

     1             (Base Construction Allocation -
     2             $150,000)
     3             (Land Allocation - $5,000)
     4             (Design and Contingencies - $60,000)
     5         (19)  Municipality of Penn Hills, Lincoln
     6             Road Bridge No.12 over Sandy Creek,
     7             Bridge Replacement                            215,000
     8             (Base Construction Allocation -
     9             $150,000)
    10             (Land Allocation - $5,000)
    11             (Design and Contingencies - $60,000)
    12         (20)  Sewickley Heights Borough, Blackburn
    13             Road over Kilbuck Run, Bridge
    14             Rehabilitation                                145,000
    15             (Base Construction Allocation -
    16             $110,000)
    17             (Land Allocation - $5,000)
    18             (Design and Contingencies - $30,000)
    19         (21)  South Park Township, Sleepy Hollow
    20             Road over Sleepy Hollow, Bridge
    21             Replacement                                   295,000
    22             (Base Construction Allocation -
    23             $200,000)
    24             (Land Allocation - $5,000)
    25             (Design and Contingencies - $90,000)
    26         (22)  South Park Township, Cochran's Mill
    27             Road over Licks Run, Bridge
    28             Replacement                                   215,000
    29             (Base Construction Allocation -
    30             $150,000)
    19970S0186B0179                  - 8 -

     1             (Land Allocation - $5,000)
     2             (Design and Contingencies - $60,000)
     3         (23)  Hampton Township, T-357, Bridge over
     4             Gourdhead Run, Bridge Rehabilitation          320,000
     5             (Base Construction Allocation -
     6             $280,000)
     7             (Design and Contingencies - $40,000)
     8         (24)  Hampton Township, T-984, South
     9             Pioneer Road Bridge No.1 over Crouse
    10             Run, Bridge Rehabilitation                    250,000
    11             (Base Construction Allocation -
    12             $210,000)
    13             (Design and Contingencies - $40,000)
    14         (25)  Hampton Township, T-984, South
    15             Pioneer Road Bridge No.2 over Crouse
    16             Run, Bridge Rehabilitation                    250,000
    17             (Base Construction Allocation -
    18             $210,000)
    19             (Design and Contingencies - $40,000)
    20         (26)  Marshall Township, T-482, Northgate
    21             Drive Bridge over Brush Creek, Bridge
    22             Replacement                                   320,000
    23             (Base Construction Allocation -
    24             $280,000)
    25             (Land Allocation - $5,000)
    26             (Design and Contingencies - $35,000)
    27         (27)  Town of McCandless, Blazier Drive
    28             Bridge No.1 over Pine Creek, Bridge
    29             Rehabilitation                                 17,000
    30             (Base Construction Allocation -
    19970S0186B0179                  - 9 -

     1             $15,000)
     2             (Design and Contingencies - $2,000)
     3         (28)  Town of McCandless, Blazier Drive
     4             Bridge No.2 over Pine Creek, Bridge
     5             Rehabilitation                                 28,000
     6             (Base Construction Allocation -
     7             $26,000)
     8             (Design and Contingencies - $2,000)
     9         (29)  Town of McCandless, Blazier Drive
    10             Bridge No.3 over Pine Creek, Bridge
    11             Rehabilitation                                  3,000
    12             (Base Construction Allocation - $2,000)
    13             (Design and Contingencies - $1,000)
    14         (30)  Town of McCandless, Oakridge Drive
    15             over Pine Creek, Bridge Rehabilitation         10,000
    16             (Base Construction Allocation - $8,000)
    17             (Design and Contingencies - $2,000)
    18         (31)  Town of McCandless, Meinert Road over
    19             Pine Creek, Bridge Rehabilitation               3,000
    20             (Base Construction Allocation - $2,000)
    21             (Design and Contingencies - $1,000)
    22         (32)  Collier Township, Thom's Run Road-
    23             Oakdale Road No.4 over Thom's Run,
    24             Bridge Replacement                            210,000
    25             (Base Construction Allocation -
    26             $160,000)
    27             (Land Allocation - $10,000)
    28             (Design and Contingencies - $40,000)
    29         (33)  Collier Township, Thom's Run Road-
    30             Oakdale Road No.5 over Thom's Run,
    19970S0186B0179                 - 10 -

     1             Bridge Replacement                            210,000
     2             (Base Construction Allocation -
     3             $160,000)
     4             (Land Allocation - $10,000)
     5             (Design and Contingencies - $40,000)
     6         (34)  Collier Township, Thom's Run Road-
     7             Oakdale Road No.9 over Thom's Run,
     8             Bridge Replacement                            180,000
     9             (Base Construction Allocation -
    10             $130,000)
    11             (Land Allocation - $10,000)
    12             (Design and Contingencies - $40,000)
    13         (35)  Etna Borough, Dewey Street over
    14             Little Pine Creek, Bridge
    15             Rehabilitation                                 23,000
    16             (Base Construction Allocation -
    17             $20,000)
    18             (Design and Contingencies - $3,000)
    19         (36)  Forward Township, Roberts Hollow Road
    20             over Fallen Timber Run, Bridge
    21             Replacement                                   200,000
    22             (Base Construction Allocation -
    23             $160,000)
    24             (Land Allocation - $10,000)
    25             (Design and Contingencies - $30,000)
    26         (37)  Hampton Township, Duncan Avenue over
    27             Stillhouse Run, Bridge Replacement            230,000
    28             (Base Construction Allocation -
    29             $170,000)
    30             (Land Allocation - $10,000)
    19970S0186B0179                 - 11 -

     1             (Design and Contingencies - $50,000)
     2         (38)  Penn Hills Township, Lincoln Road
     3             over Ryans Run, Bridge Replacement            190,000
     4             (Base Construction Allocation -
     5             $140,000)
     6             (Land Allocation - $10,000)
     7             (Design and Contingencies - $40,000)
     8         (39)  Penns Hills Township, Lincoln Road
     9             over Sandy Creek, Bridge Replacement          195,000
    10             (Base Construction Allocation -
    11             $150,000)
    12             (Land Allocation - $5,000)
    13             (Design and Contingencies - $40,000)
    14         (40)  North Versailles Township, Crooked
    15             Run Road over Crooked Run, Bridge
    16             Replacement                                   170,000
    17             (Base Construction Allocation -
    18             $130,000)
    19             (Land Allocation - $10,000)
    20             (Design and Contingencies - $30,000)
    21         (41)  O'Hara Township, Brownhill Road over
    22             Little Pine Creek, Bridge Replacement         275,000
    23             (Base Construction Allocation -
    24             $231,000)
    25             (Design and Contingencies - $44,000)
    26         (42)  Ross Township, Thompson Run Road over
    27             South Branch of Pine Creek, Bridge
    28             Replacement                                   210,000
    29             (Base Construction Allocation -
    30             $160,000)
    19970S0186B0179                 - 12 -

     1             (Land Allocation - $8,000)
     2             (Design and Contingencies - $42,000)
     3         (43)  Moon Township, T-114, Becks Run Road
     4             over Flaugherty Run, Bridge
     5             Replacement                                   420,000
     6             (Base Construction Allocation -
     7             $350,000)
     8             (Land Allocation - $20,000)
     9             (Design and Contingencies - $50,000)
    10     (b)  State Bridges
    11         (1)  SR 0028, Etna Bridge, Northbound
    12             Bridge No.4 to Existing SR 0028, Etna
    13             Borough, Shaler Township, Sharpsburg
    14             Borough and O'Hara Township, Bridge
    15             Rehabilitation                              7,415,000
    16             (Base Construction Allocation -
    17             $7,115,000)
    18             (Land Allocation - $300,000)
    19         (2)  SR 0028, Etna Bridge to 62nd Street
    20             Bridge, Etna Borough, Shaler Township,
    21             Sharpsburg Borough and O'Hara Township,
    22             Bridge Rehabilitation                      17,222,000
    23             (Base Construction Allocation -
    24             $17,022,000)
    25             (Land Allocation - $200,000)
    26         (3)  SR 0030, Ardmore Westbound Electric
    27             over SR 2112, Chalfant Borough, Bridge
    28             Replacement                                 3,100,000
    29             (Base Construction Allocation -
    30             $3,000,000)
    19970S0186B0179                 - 13 -

     1             (Design and Contingencies - $100,000)
     2         (4)  SR 0030, Ardmore Eastbound Electric
     3             over SR 2112, Chalfant Borough, Bridge
     4             Replacement                                 2,500,000
     5             (Base Construction Allocation -
     6             $2,400,000)
     7             (Design and Contingencies - $100,000)
     8         (5)  SR 0030, Ardmore Boulevard Bridge No.1
     9             over Falls Run, North of SR 8012
    10             Interchange, Forest Hills Borough,
    11             Bridge Replacement                            550,000
    12             (Base Construction Allocation -
    13             $400,000)
    14             (Land Allocation - $50,000)
    15             (Design and Contingencies - $100,000)
    16         (6)  SR 0048, Boston Hollow Road Bridge
    17             over Unnamed Stream, North of Lincoln
    18             Borough, Elizabeth Borough, Bridge
    19             Replacement                                   340,000
    20             (Base Construction Allocation -
    21             $200,000)
    22             (Land Allocation - $40,000)
    23             (Design and Contingencies - $100,000)
    24         (7)  SR 0050, Bridge over Chartiers Creek,
    25             Northbound Lane, Heidelberg Borough,
    26             Scott Township, Bridge Rehabilitation       3,750,000
    27             (Base Construction Allocation -
    28             $3,300,000)
    29             (Land Allocation - $50,000)
    30             (Design and Contingencies - $400,000)
    19970S0186B0179                 - 14 -

     1         (8)  SR 0060, South Main Street Bridge over
     2             Saw Mill Run, South of West End Circle,
     3             City of Pittsburgh, Bridge Painting           178,000
     4             (Base Construction Allocation -
     5             $173,000)
     6             (Design and Contingencies - $5,000)
     7         (9)  SR 0130, Tri-Borough Extended Bridge
     8             over Patton Street at SR 8076
     9             Interchange, Wilmerding Borough, Bridge
    10             Rehabilitation                                505,000
    11             (Base Construction Allocation -
    12             $400,000)
    13             (Land Allocation - $30,000)
    14             (Design and Contingencies - $75,000)
    15         (10)  SR 0148, Bridge over Crooked Run
    16             Creek near SR 2037, White Oak Borough,
    17             Bridge Replacement                            350,000
    18             (Base Construction Allocation -
    19             $200,000)
    20             (Land Allocation - $50,000)
    21             (Design and Contingencies - $100,000)
    22         (11)  SR 0791, Bridge over Chalfont Run at
    23             SR 2048, Wilkins Township, Bridge
    24             Replacement                                   450,000
    25             (Base Construction Allocation -
    26             $300,000)
    27             (Land Allocation - $50,000)
    28             (Design and Contingencies - $100,000)
    29         (12)  SR 0837, Northbound Ramp A to SR 0885
    30             Southbound, City of Pittsburgh, Bridge
    19970S0186B0179                 - 15 -

     1             Rehabilitation                              1,350,000
     2             (Base Construction Allocation -
     3             $1,250,000)
     4             (Design and Contingencies - $100,000)
     5         (13)  SR 0978, Miller's Run Road Bridge
     6             over Dolphin Run, South Fayette
     7             Township, Bridge Replacement                  300,000
     8             (Base Construction Allocation -
     9             $200,000)
    10             (Design and Contingencies - $100,000)
    11         (14)  SR 1001, West 7th Avenue Bridge over
    12             Bull Creek, Tarentum Borough, Bridge
    13             Replacement                                   400,000
    14             (Base Construction Allocation -
    15             $300,000)
    16             (Design and Contingencies - $100,000)
    17         (15)  SR 1011, Guys Run Road Bridge over
    18             Guys Run, North of SR 0028, Harmar
    19             Township, Bridge Replacement                  350,000
    20             (Base Construction Allocation -
    21             $200,000)
    22             (Land Allocation - $50,000)
    23             (Design and Contingencies - $100,000)
    24         (16)  SR 2001, Glassport-Elizabeth Road
    25             Bridge over Burns Run, North of
    26             Elizabeth Township, Lincoln Borough,
    27             Bridge Replacement                            350,000
    28             (Base Construction Allocation -
    29             $200,000)
    30             (Land Allocation - $50,000)
    19970S0186B0179                 - 16 -

     1             (Design and Contingencies - $100,000)
     2         (17)  SR 2081, Turtle Creek-Monroeville
     3             Road over US 22 Business, Monroeville
     4             Borough, Bridge Replacement                 1,060,000
     5             (Base Construction Allocation -
     6             $960,000)
     7             (Design and Contingencies - $100,000)
     8         (18)  SR 2094, Jerome Street Bridge over SR
     9             2027, Youghiogheny River, McKeesport
    10             Borough, Bridge Rehabilitation              4,600,000
    11             (Base Construction Allocation -
    12             $4,500,000)
    13             (Design and Contingencies - $100,000)
    14         (19)  SR 3066, Steubenville Pike Bridge
    15             over US 22, North Fayette Township,
    16             Bridge Rehabilitation                         500,000
    17             (Base Construction Allocation -
    18             $400,000)
    19             (Land Allocation - $25,000)
    20             (Design and Contingencies - $75,000)
    21         (20)  SR 3069, Liberty Tunnel Airshaft
    22             between SR 0051 and Liberty Bridge,
    23             City of Pittsburgh, Airshaft
    24             Restoration                                 1,570,000
    25             (Base Construction Allocation -
    26             $1,370,000)
    27             (Design and Contingencies - $200,000)
    28         (21)  SR 3104, McKees Rocks Sidewalk over
    29             Harriet Street, McKees Rocks Borough,
    30             Bridge Rehabilitation                       6,800,000
    19970S0186B0179                 - 17 -

     1             (Base Construction Allocation -
     2             $6,700,000)
     3             (Design and Contingencies - $100,000)
     4         (22)  SR 4036, Big Sewickley Creek Road
     5             over Big Sewickley Creek at SR 2003,
     6             Bell Acres Borough, Bridge
     7             Rehabilitation                                500,000
     8             (Base Construction Allocation -
     9             $400,000)
    10             (Land Allocation - $25,000)
    11             (Design and Contingencies - $75,000)
    12         (23)  SR 8043, Southbound Ramp Bridge over
    13             SR 0019 and SR 0065, City of
    14             Pittsburgh, Bridge Rehabilitation           2,400,000
    15             (Base Construction Allocation -
    16             $2,100,000)
    17             (Land Allocation - $50,000)
    18             (Design and Contingencies - $250,000)
    19         (24)  SR 8045, Ramp at Stadium over SR 0065
    20             and Stadium Drive, City of Pittsburgh,
    21             Bridge Rehabilitation                         600,000
    22             (Base Construction Allocation -
    23             $600,000)
    24         (25)  SR 8049, SR 0019 Bridge Ramp, Chateau
    25             Street to SR 0019, City of Pittsburgh,
    26             Bridge Rehabilitation                       2,350,000
    27             (Base Construction Allocation -
    28             $2,000,000)
    29             (Land Allocation - $50,000)
    30             (Design and Contingencies - $300,000)
    19970S0186B0179                 - 18 -

     1         (26)  SR 8049, Bridge Ramp from SR 0065
     2             Northbound to SR 0019, City of
     3             Pittsburgh, Bridge Rehabilitation           2,850,000
     4             (Base Construction Allocation -
     5             $2,500,000)
     6             (Land Allocation - $50,000)
     7             (Design and Contingencies - $300,000)
     8         (27)  SR 8049, I-279 Bridge Ramp to SR 0065
     9             Northbound, City of Pittsburgh, Bridge
    10             Rehabilitation                              1,730,000
    11             (Base Construction Allocation -
    12             $1,500,000)
    13             (Land Allocation - $30,000)
    14             (Design and Contingencies - $200,000)
    15         (28)  SR 0030, Ardmore Boulevard Bridge
    16             No.2 over Falls Run, North of SR 8012
    17             Interchange, Forest Hills Borough,
    18             Bridge Replacement                            550,000
    19             (Base Construction Allocation -
    20             $400,000)
    21             (Land Allocation - $50,000)
    22             (Design and Contingencies - $100,000)
    23         (29)  SR 3004, McLaughlin Road Bridge over
    24             McLaughlin Run, Bridgeville Borough,
    25             Bridge Replacement                            227,000
    26             (Base Construction Allocation -
    27             $177,000)
    28             (Land Allocation - $10,000)
    29             (Design and Contingencies - $40,000)
    30         (30)  SR 0028, Northbound Bridge over
    19970S0186B0179                 - 19 -

     1             Pennsylvania Turnpike, Harmar Township,
     2             Bridge Rehabilitation                         344,000
     3             (Base Construction Allocation -
     4             $314,000)
     5             (Design and Contingencies - $30,000)
     6         (31)  SR 0028, Southbound Bridge over
     7             Pennsylvania Turnpike, Harmar Township,
     8             Bridge Rehabilitation                         356,000
     9             (Base Construction Allocation -
    10             $325,000)
    11             (Design and Contingencies - $31,000)
    12         (32)  SR 0028, Northbound Bridge over SR
    13             1028, Harrison Township, Bridge
    14             Rehabilitation                                106,000
    15             (Base Construction Allocation -
    16             $97,000)
    17             (Design and Contingencies - $9,000)
    18         (33)  SR 0028, Southbound Bridge over SR
    19             1028, Harrison Township, Bridge
    20             Rehabilitation                                105,000
    21             (Base Construction Allocation -
    22             $96,000)
    23             (Design and Contingencies - $9,000)
    24         (34)  SR 0050, Washington Avenue Bridge
    25             over Chartiers Creek, Bridgeville
    26             Borough, Bridge Rehabilitation                119,000
    27             (Base Construction Allocation -
    28             $109,000)
    29             (Design and Contingencies - $10,000)
    30         (35)  SR 0051, Clairton Boulevard Bridge
    19970S0186B0179                 - 20 -

     1             over Lewis Run, Pleasant Hills Borough,
     2             Bridge Replacement                            600,000
     3             (Base Construction Allocation -
     4             $500,000)
     5             (Design and Contingencies - $100,000)
     6         (36)  SR 0065, Ohio River Boulevard Bridge
     7             over Forest Avenue, Ben Avon Borough,
     8             Bridge Replacement                            396,000
     9             (Base Construction Allocation -
    10             $360,000)
    11             (Design and Contingencies - $36,000)
    12         (37)  SR 0065, Bridge over Ramps, Railroad
    13             and Chateau Street, City of Pittsburgh,
    14             Bridge Rehabilitation                      13,284,000
    15             (Base Construction Allocation -
    16             $12,784,000)
    17             (Design and Contingencies - $500,000)
    18         (38)  SR 0079, Neville Island Bridge over
    19             Ohio River, Neville Township, Bridge
    20             Rehabilitation                             12,700,000
    21             (Base Construction Allocation -
    22             $11,200,000)
    23             (Design and Contingencies - $1,500,000)
    24         (39)  SR 0088, Library Road Bridge No.1
    25             over Piney Fork Creek, Bethel Park
    26             Borough, Bridge Replacement                   161,000
    27             (Base Construction Allocation -
    28             $128,000)
    29             (Land Allocation - $20,000)
    30             (Design and Contingencies - $13,000)
    19970S0186B0179                 - 21 -

     1         (40)  SR 0088, Library Road Bridge No.2
     2             over Branch of Piney Fork Creek, Bethel
     3             Park Borough, Bridge Replacement              161,000
     4             (Base Construction Allocation -
     5             $128,000)
     6             (Land Allocation - $20,000)
     7             (Design and Contingencies - $13,000)
     8         (41)  SR 0885, Mifflin Road Bridge over
     9             Branch of Streets Run, City of
    10             Pittsburgh, Bridge Replacement                600,000
    11             (Base Construction Allocation -
    12             $500,000)
    13             (Design and Contingencies - $100,000)
    14         (42)  SR 0910, Gibsonia Road Bridge over
    15             Rawlins Run, Indiana Township, Bridge
    16             Deck Replacement                              132,000
    17             (Base Construction Allocation -
    18             $120,000)
    19             (Design and Contingencies - $12,000)
    20         (43)  SR 1027, Pleasantville Road Bridge
    21             over Little Bull Creek, Harrison
    22             Township, Bridge Replacement                  400,000
    23             (Base Construction Allocation -
    24             $300,000)
    25             (Design and Contingencies - $100,000)
    26         (44)  SR 1032, Burtner Road Bridge over
    27             Little Bull Creek, Harrison Township,
    28             Bridge Deck Replacement                       198,000
    29             (Base Construction Allocation -
    30             $180,000)
    19970S0186B0179                 - 22 -

     1             (Design and Contingencies - $18,000)
     2         (45)  SR 2008, Lovedale Road Bridge over
     3             Wylie Run Creek, Elizabeth Township,
     4             Bridge Replacement                            430,000
     5             (Base Construction Allocation -
     6             $300,000)
     7             (Land Allocation - $30,000)
     8             (Design and Contingencies - $100,000)
     9         (46)  SR 2017, Pineview Drive Bridge No.1
    10             over Gillespie Run, Elizabeth Township,
    11             Bridge Deck Replacement                       255,000
    12             (Base Construction Allocation -
    13             $135,000)
    14             (Land Allocation - $20,000)
    15             (Design and Contingencies - $100,000)
    16         (47)  SR 2017, Pineview Drive Bridge No.2
    17             over Gillespie Run, Elizabeth Township,
    18             Bridge Deck Replacement                       243,000
    19             (Base Construction Allocation -
    20             $123,000)
    21             (Land Allocation - $20,000)
    22             (Design and Contingencies - $100,000)
    23         (48)  SR 2018, West Smithfield Road Bridge
    24             over Unnamed Creek, Elizabeth Township,
    25             Bridge Deck Replacement                       218,000
    26             (Base Construction Allocation -
    27             $118,000)
    28             (Design and Contingencies - $100,000)
    29         (49)  SR 2031, Lincoln Way Bridge over Long
    30             Run, White Oak Borough, Bridge
    19970S0186B0179                 - 23 -

     1             Replacement                                   600,000
     2             (Base Construction Allocation -
     3             $500,000)
     4             (Design and Contingencies - $100,000)
     5         (50)  SR 2051, Brinton Road Bridge over I-
     6             376, Edgewood Borough, Bridge
     7             Rehabilitation                                996,000
     8             (Base Construction Allocation -
     9             $846,000)
    10             (Design and Contingencies - $150,000)
    11         (51)  SR 4019, Mount Royal Boulevard Bridge
    12             over Pine Creek, Hampton Township,
    13             Bridge Rehabilitation                          94,000
    14             (Base Construction Allocation -
    15             $89,000)
    16             (Design and Contingencies - $5,000)
    17         (52)  SR 4043, Big Sewickley Road Bridge
    18             over Branch of Big Sewickley Creek,
    19             Franklin Park Borough, Bridge
    20             Replacement                                    84,000
    21             (Base Construction Allocation -
    22             $76,000)
    23             (Design and Contingencies - $8,000)
    24         (53)  SR 8002, Crosstown Boulevard Bridge
    25             over Forbes and Diamond Street and
    26             Ramps, City of Pittsburgh, Bridge
    27             Painting                                      310,000
    28             (Base Construction Allocation -
    29             $300,000)
    30             (Design and Contingencies - $10,000)
    19970S0186B0179                 - 24 -

     1         (54)  SR 8002, Ramp L Road Bridge over
     2             Forbes and Diamond Streets, City of
     3             Pittsburgh, Bridge Painting                   110,000
     4             (Base Construction Allocation -
     5             $100,000)
     6             (Design and Contingencies - $10,000)
     7         (55)  SR 8015, Ramp D Road Bridge over Ohio
     8             River Back Channel, Neville Township,
     9             Bridge Rehabilitation                         800,000
    10             (Base Construction Allocation -
    11             $700,000)
    12             (Design and Contingencies - $100,000)
    13         (56)  SR 8015, Ramp E Road Bridge over PC&Y
    14             Railroad, Neville Township, Bridge
    15             Rehabilitation                                670,000
    16             (Base Construction Allocation -
    17             $500,000)
    18             (Design and Contingencies - $170,000)
    19         (57)  SR 8015, I-79 Ramp H Bridge over PC&Y
    20             Railroad, Neville Township, Bridge
    21             Rehabilitation                                700,000
    22             (Base Construction Allocation -
    23             $600,000)
    24             (Design and Contingencies - $100,000)
    25         (58)  SR 8015, Ramp J Road Bridge over
    26             Neville Road, Neville Township, Bridge
    27             Rehabilitation                                220,000
    28             (Base Construction Allocation -
    29             $200,000)
    30             (Design and Contingencies - $20,000)
    19970S0186B0179                 - 25 -

     1         (59)  SR 8017, Ramp B2 Road Bridge over SR
     2             4025 and SR 4033, Glenfield Borough,
     3             Bridge Rehabilitation                         110,000
     4             (Base Construction Allocation -
     5             $100,000)
     6             (Design and Contingencies - $10,000)
     7         (60)  SR 8017, Ramp B Road Bridge over Ramp
     8             A and SR 4033, Glenfield Borough,
     9             Bridge Rehabilitation                         120,000
    10             (Base Construction Allocation -
    11             $110,000)
    12             (Design and Contingencies - $10,000)
    13         (61)  SR 8017, Ramp B1 Road Bridge over SR
    14             0065 Ramps A1 and R, Glenfield Borough,
    15             Bridge Rehabilitation                         165,000
    16             (Base Construction Allocation -
    17             $150,000)
    18             (Design and Contingencies - $15,000)
    19         (62)  SR 8017, Ramp A Road Bridge over Ramp
    20             B3, Glenfield Borough, Bridge
    21             Rehabilitation                                110,000
    22             (Base Construction Allocation -
    23             $100,000)
    24             (Design and Contingencies - $10,000)
    25  Section 7.  Armstrong County.
    26     (a)  Local Bridges
    27         (1)  Boggs Township, T-850, Scrubgrass
    28             Bridge over Scrubgrass Creek, Bridge
    29             Rehabilitation                                230,000
    30             (Base Construction Allocation -
    19970S0186B0179                 - 26 -

     1             $170,000)
     2             (Land Allocation - $10,000)
     3             (Design and Contingencies - $50,000)
     4         (2)  Boggs Township, T-632, Scrubgrass
     5             Bridge No.2 over Scrubgrass Creek,
     6             Bridge Rehabilitation                         185,000
     7             (Base Construction Allocation -
     8             $150,000)
     9             (Land Allocation - $10,000)
    10             (Design and Contingencies - $25,000)
    11         (3)  Boggs Township, T-821, Pine Creek
    12             Bridge over North Fork of Pine Creek,
    13             Bridge Rehabilitation                         140,000
    14             (Base Construction Allocation -
    15             $100,000)
    16             (Land Allocation - $10,000)
    17             (Design and Contingencies - $30,000)
    18         (4)  North Buffalo Township, T-300, Blaine
    19             Bridge over Buffalo Creek, Bridge
    20             Replacement                                   500,000
    21             (Base Construction Allocation -
    22             $400,000)
    23             (Land Allocation - $20,000)
    24             (Design and Contingencies - $80,000)
    25         (5)  North Buffalo Township, T-414, Church
    26             Road Bridge over Stream, Bridge
    27             Replacement                                   150,000
    28             (Base Construction Allocation -
    29             $100,000)
    30             (Land Allocation - $10,000)
    19970S0186B0179                 - 27 -

     1             (Design and Contingencies - $40,000)
     2         (6)  West Kittanning Borough, T-759, Bridge
     3             over Stream, Bridge Replacement               325,000
     4             (Base Construction Allocation -
     5             $265,000)
     6             (Land Allocation - $10,000)
     7             (Design and Contingencies - $50,000)
     8     (b)  State Bridges
     9         (1)  SR 0028, Buffalo Creek Bridge over
    10             Buffalo Creek and Conrail, South
    11             Buffalo Township, Bridge Painting           3,010,000
    12             (Base Construction Allocation -
    13             $3,000,000)
    14             (Design and Contingencies - $10,000)
    15         (2)  SR 3023, Iron Bridge Road, Pine Run
    16             Bridge Replacement, South Buffalo
    17             Township, Bridge Replacement                  550,000
    18             (Base Construction Allocation -
    19             $510,000)
    20             (Land Allocation - $20,000)
    21             (Design and Contingencies - $20,000)
    22         (3)  SR 0156, Long Run Bridge over Long
    23             Run, Kiskiminetas Township, Bridge
    24             Painting                                       75,000
    25             (Base Construction Allocation -
    26             $60,000)
    27             (Design and Contingencies - $15,000)
    28         (4)  SR 0422, US 422 Eastbound Overpass
    29             Bridge over SR 0028, East Franklin
    30             Township, Bridge Painting                     190,000
    19970S0186B0179                 - 28 -

     1             (Base Construction Allocation -
     2             $175,000)
     3             (Design and Contingencies - $15,000)
     4         (5)  SR 0422, US 422 Westbound Overpass
     5             Bridge over SR 0028, East Franklin
     6             Township, Bridge Painting                     190,000
     7             (Base Construction Allocation -
     8             $175,000)
     9             (Design and Contingencies - $15,000)
    10         (6)  SR 1028, Oscar Bridge over Pine Creek,
    11             Boggs Township, Bridge Painting                95,000
    12             (Base Construction Allocation -
    13             $80,000)
    14             (Design and Contingencies - $15,000)
    15         (7)  SR 0028, Buffalo Creek Bridge over
    16             Buffalo Creek, South Buffalo Township,
    17             Bridge Painting                             1,730,000
    18             (Base Construction Allocation -
    19             $1,700,000)
    20             (Design and Contingencies - $30,000)
    21         (8)  SR 0066, Guffy Run Bridge over Guffy
    22             Run, Parks Township, Bridge Painting           85,000
    23             (Base Construction Allocation -
    24             $70,000)
    25             (Design and Contingencies - $15,000)
    26         (9)  SR 0066, Garrett's Run Bridge over
    27             Garrett's Run and Old 66, Manor
    28             Township, Bridge Painting                   1,230,000
    29             (Base Construction Allocation -
    30             $1,200,000)
    19970S0186B0179                 - 29 -

     1             (Design and Contingencies - $30,000)
     2         (10)  SR 0128, Cadogan Bridge over
     3             Tributary of Allegheny River, Cadogan
     4             Township, Bridge Painting                     380,000
     5             (Base Construction Allocation -
     6             $360,000)
     7             (Design and Contingencies - $20,000)
     8         (11)  SR 0422, Judge Graff Bridge over
     9             Allegheny River, North Buffalo
    10             Township, Bridge Painting                   2,930,000
    11             (Base Construction Allocation -
    12             $2,900,000)
    13             (Design and Contingencies - $30,000)
    14         (12)  SR 0422, Ramp C and F Bridge over End
    15             of Bypass, Manor Township, Bridge
    16             Painting                                      180,000
    17             (Base Construction Allocation -
    18             $165,000)
    19             (Design and Contingencies - $15,000)
    20         (13)  SR 0422, Ramp F Bridge over SR 0066,
    21             Manor Township, Bridge Painting               190,000
    22             (Base Construction Allocation -
    23             $175,000)
    24             (Design and Contingencies - $15,000)
    25         (14)  SR 1021, Eddyville Bridge over Pine
    26             Run, Redbank Township, Bridge Painting        100,000
    27             (Base Construction Allocation -
    28             $85,000)
    29             (Design and Contingencies - $15,000)
    30         (15)  SR 1028, Bryan Bridge over Branch of
    19970S0186B0179                 - 30 -

     1             Pine Creek, Cowanshannock Township,
     2             Bridge Painting                                50,000
     3             (Base Construction Allocation -
     4             $35,000)
     5             (Design and Contingencies - $15,000)
     6         (16)  SR 1034, Mosgrove Bridge over North
     7             Fork of Pine Creek, Boggs Township,
     8             Bridge Painting                                65,000
     9             (Base Construction Allocation -
    10             $50,000)
    11             (Design and Contingencies - $15,000)
    12         (17)  SR 1037, Echo Bridge over Pine Creek,
    13             Wayne Township, Bridge Painting                85,000
    14             (Base Construction Allocation -
    15             $70,000)
    16             (Design and Contingencies - $15,000)
    17         (18)  SR 2001, Rural Valley Bridge over
    18             Cowanshannock Creek, Rural Valley
    19             Borough, Bridge Painting                      130,000
    20             (Base Construction Allocation -
    21             $115,000)
    22             (Design and Contingencies - $15,000)
    23         (19)  SR 2005, Brick Church Bridge over
    24             Branch of Cherry Run, Burrell Township,
    25             Bridge Painting                                75,000
    26             (Base Construction Allocation -
    27             $60,000)
    28             (Design and Contingencies - $15,000)
    29         (20)  SR 2005, Cherry Run Bridge over
    30             Cherry Run, Plumcreek Township, Bridge
    19970S0186B0179                 - 31 -

     1             Painting                                       85,000
     2             (Base Construction Allocation -
     3             $70,000)
     4             (Design and Contingencies - $15,000)
     5         (21)  SR 2005, Elgin Cemetery Bridge over
     6             Cowanshannock Creek, Cowanshannock
     7             Township, Bridge Painting                      85,000
     8             (Base Construction Allocation -
     9             $70,000)
    10             (Design and Contingencies - $15,000)
    11         (22)  SR 2010, Garrett's Run Bridge over
    12             Garrett's Run, Manor Township, Bridge
    13             Painting                                       75,000
    14             (Base Construction Allocation -
    15             $60,000)
    16             (Design and Contingencies - $15,000)
    17         (23)  SR 2023, Wheel-in-Campground Bridge
    18             over Plum Creek, Plumcreek Township,
    19             Bridge Painting                               125,000
    20             (Base Construction Allocation -
    21             $110,000)
    22             (Design and Contingencies - $15,000)
    23         (24)  SR 2025, Garrett's Run Bridge No.1
    24             over Garrett's Run, Manor Township,
    25             Bridge Painting                                80,000
    26             (Base Construction Allocation -
    27             $65,000)
    28             (Design and Contingencies - $15,000)
    29         (25)  SR 2025, Garrett's Run Bridge No.2
    30             over Garrett's Run, Manor Township,
    19970S0186B0179                 - 32 -

     1             Bridge Painting                                80,000
     2             (Base Construction Allocation -
     3             $65,000)
     4             (Design and Contingencies - $15,000)
     5         (26)  SR 2025, Garrett's Run Bridge No.3
     6             over Garrett's Run, Manor Township,
     7             Bridge Painting                                90,000
     8             (Base Construction Allocation -
     9             $75,000)
    10             (Design and Contingencies - $15,000)
    11         (27)  SR 2027, Girty Bridge over Crooked
    12             Creek, South Bend Township, Bridge
    13             Painting                                      155,000
    14             (Base Construction Allocation -
    15             $140,000)
    16             (Design and Contingencies - $15,000)
    17         (28)  SR 2029, Kelly's Station Road Bridge
    18             over Taylor Run, Bethel Township,
    19             Bridge Painting                                60,000
    20             (Base Construction Allocation -
    21             $45,000)
    22             (Design and Contingencies - $15,000)
    23         (29)  SR 2036, Stilt's Run Bridge over
    24             Stilt's Run, Parks Township, Bridge
    25             Painting                                       50,000
    26             (Base Construction Allocation -
    27             $35,000)
    28             (Design and Contingencies - $15,000)
    29         (30)  SR 2036, Carnahan Run Bridge over
    30             Carnahan Run, Parks Township, Bridge
    19970S0186B0179                 - 33 -

     1             Painting                                       75,000
     2             (Base Construction Allocation -
     3             $60,000)
     4             (Design and Contingencies - $15,000)
     5         (31)  SR 2050, Rattling Run Bridge over
     6             Rattling Run, Kiskiminetas Township,
     7             Bridge Painting                                65,000
     8             (Base Construction Allocation -
     9             $50,000)
    10             (Design and Contingencies - $15,000)
    11         (32)  SR 2051, Flat Run Bridge over Flat
    12             Run, Kiskiminetas Township, Bridge
    13             Painting                                       55,000
    14             (Base Construction Allocation -
    15             $40,000)
    16             (Design and Contingencies - $15,000)
    17         (33)  SR 2051, Equitable Bridge over
    18             Rattling Run, Kiskiminetas Township,
    19             Bridge Painting                                55,000
    20             (Base Construction Allocation -
    21             $40,000)
    22             (Design and Contingencies - $15,000)
    23         (34)  SR 2057, Parks Pump Station Bridge
    24             No.1 over Carnahan Run, Parks Township,
    25             Bridge Painting                                80,000
    26             (Base Construction Allocation -
    27             $65,000)
    28             (Design and Contingencies - $15,000)
    29         (35)  SR 2058, Parks Pump Station Bridge
    30             No.2 over Carnahan Run, Parks Township,
    19970S0186B0179                 - 34 -

     1             Bridge Painting                                75,000
     2             (Base Construction Allocation -
     3             $60,000)
     4             (Design and Contingencies - $15,000)
     5         (36)  SR 3005, Glade Run Bridge over Glade
     6             Run, North Buffalo Township, Bridge
     7             Painting                                       75,000
     8             (Base Construction Allocation -
     9             $60,000)
    10             (Design and Contingencies - $15,000)
    11         (37)  SR 3013, Little Buffalo Bridge over
    12             Little Buffalo Creek, West Franklin
    13             Township, Bridge Painting                     100,000
    14             (Base Construction Allocation -
    15             $85,000)
    16             (Design and Contingencies - $15,000)
    17         (38)  SR 3013, Harrigan Run Bridge over
    18             Harrigan Run, West Franklin Township,
    19             Bridge Painting                                60,000
    20             (Base Construction Allocation -
    21             $45,000)
    22             (Design and Contingencies - $15,000)
    23         (39)  SR 3017, West Penn Power Bridge over
    24             SR 0422 and SR 0028, East Franklin
    25             Township, Bridge Painting                     375,000
    26             (Base Construction Allocation -
    27             $360,000)
    28             (Design and Contingencies - $15,000)
    29         (40)  SR 4007, Kaylor Bridge over Sugar
    30             Creek, Bradys Bend Township, Bridge
    19970S0186B0179                 - 35 -

     1             Painting                                       60,000
     2             (Base Construction Allocation -
     3             $45,000)
     4             (Design and Contingencies - $15,000)
     5         (41)  SR 4013, Foster Mills Bridge over
     6             Branch of Patterson Run, Sugarcreek
     7             Township, Bridge Painting                      70,000
     8             (Base Construction Allocation -
     9             $55,000)
    10             (Design and Contingencies - $15,000)
    11         (42)  SR 8008, Ford City Ramp from Judge
    12             Graff Bridge over a ravine, Manor
    13             Township, Bridge Painting                     555,000
    14             (Base Construction Allocation -
    15             $540,000)
    16             (Design and Contingencies - $15,000)
    17         (43)  SR 4035, Craigsville Bridge over
    18             Buffalo Creek, West Franklin Township,
    19             Bridge Painting                               140,000
    20             (Base Construction Allocation -
    21             $125,000)
    22             (Design and Contingencies - $15,000)
    23         (44)  SR 0068, Kaylor Overpass, Railroad
    24             over PA 68, Bradys Bend Township,
    25             Bridge Removal                                560,000
    26             (Base Construction Allocation -
    27             $500,000)
    28             (Land Allocation - $10,000)
    29             (Design and Contingencies - $50,000)
    30         (45)  SR 0068, B&LE Railroad Overpass,
    19970S0186B0179                 - 36 -

     1             Bradys Bend Township, Bridge Removal           55,000
     2             (Base Construction Allocation -
     3             $50,000)
     4             (Design and Contingencies - $5,000)
     5  Section 8.  Beaver County.
     6     (a)  Local Bridges
     7         (1)  Ambridge and Aliquippa Boroughs,
     8             Ambridge - Aliquippa Bridge over Ohio
     9             River, Bridge Construction                 38,000,000
    10             (Base Construction Allocation -
    11             $30,000,000)
    12             (Land Allocation - $4,000,000)
    13             (Design and Contingencies - $4,000,000)
    14         (2)  Vanport Township, Vanport Bridge No.6
    15             over Two Mile Run, Bridge Replacement         465,000
    16             (Base Construction Allocation -
    17             $375,000)
    18             (Land Allocation - $10,000)
    19             (Design and Contingencies - $80,000)
    20         (3)  Vanport Township, Vanport Bridge No.7
    21             over Two Mile Run, Bridge Replacement         470,000
    22             (Base Construction Allocation -
    23             $380,000)
    24             (Land Allocation - $10,000)
    25             (Design and Contingencies - $80,000)
    26         (4)  Vanport Township, Vanport Bridge No.8
    27             over Two Mile Run, Bridge Replacement         510,000
    28             (Base Construction Allocation -
    29             $420,000)
    30             (Land Allocation - $10,000)
    19970S0186B0179                 - 37 -

     1             (Design and Contingencies - $80,000)
     2         (5)  Vanport Township, Vanport Bridge No.9
     3             over Two Mile Run, Bridge Replacement         440,000
     4             (Base Construction Allocation -
     5             $350,000)
     6             (Land Allocation - $10,000)
     7             (Design and Contingencies - $80,000)
     8     (b)  State Bridges
     9         (1)  SR 0051, Bridge over New York Avenue,
    10             Ramp A, Rochester Borough, Bridge Deck
    11             Replacement                                 5,600,000
    12             (Base Construction Allocation -
    13             $5,500,000)
    14             (Design and Contingencies - $100,000)
    15         (2)  SR 0351, 5th Street, Koppel-Ellwood
    16             Bridge over Beaver River, Koppel
    17             Borough and North Sewickley Township,
    18             Bridge Replacement, Phase I                33,500,000
    19             (Base Construction Allocation -
    20             $30,000,000)
    21             (Land Allocation - $1,000,000)
    22             (Design and Contingencies - $2,500,000)
    23         (3)  SR 1014, Wise's Grove Road Bridge over
    24             Brush Creek, Marion Township, Bridge
    25             Rehabilitation                                750,000
    26             (Base Construction Allocation -
    27             $600,000)
    28             (Land Allocation - $50,000)
    29             (Design and Contingencies - $100,000)
    30         (4)  SR 1022, 13th Street Bridge over
    19970S0186B0179                 - 38 -

     1             Blockhouse Run at Pulaski County Line,
     2             New Brighton Borough, Bridge
     3             Replacement                                   780,000
     4             (Base Construction Allocation -
     5             $480,000)
     6             (Land Allocation - $50,000)
     7             (Design and Contingencies - $250,000)
     8         (5)  SR 4032, Engle Road Bridge over Six
     9             Mile Run Creek, Industry Borough,
    10             Bridge Replacement                            350,000
    11             (Base Construction Allocation -
    12             $200,000)
    13             (Land Allocation - $50,000)
    14             (Design and Contingencies - $100,000)
    15         (6)  SR 4033, Wildwood Road Bridge over
    16             Brady's Run, Patterson Township, Bridge
    17             Replacement                                   400,000
    18             (Base Construction Allocation -
    19             $250,000)
    20             (Land Allocation - $50,000)
    21             (Design and Contingencies - $100,000)
    22         (7)  SR 8035, Ramp A at LR 641 over Slope,
    23             Rochester Borough, Bridge
    24             Rehabilitation                              1,200,000
    25             (Base Construction Allocation -
    26             $1,000,000)
    27             (Land Allocation - $50,000)
    28             (Design and Contingencies - $150,000)
    29         (8)  SR 8037, Ramp F over TR 51 and TR 65
    30             Northbound, Rochester Borough, Bridge
    19970S0186B0179                 - 39 -

     1             Replacement                                   550,000
     2             (Base Construction Allocation -
     3             $400,000)
     4             (Land Allocation - $50,000)
     5             (Design and Contingencies - $100,000)
     6         (9)  SR 8039, Ramp AD, SR 0168 over TR 51,
     7             Bridgewater Borough, Bridge
     8             Rehabilitation                                700,000
     9             (Base Construction Allocation -
    10             $550,000)
    11             (Land Allocation - $50,000)
    12             (Design and Contingencies - $100,000)
    13         (10)  SR 3018, Culvert-pipe Style Bridge
    14             over Moody's Run, Greene Township,
    15             Bridge Construction                           385,000
    16             (Base Construction Allocation -
    17             $350,000)
    18             (Design and Contingencies - $35,000)
    19         (11)  SR 0051, Pennsylvania Avenue Bridge
    20             over Brady's Run Creek, Fallston
    21             Borough, Bridge Replacement                   757,000
    22             (Base Construction Allocation -
    23             $637,000)
    24             (Land Allocation - $20,000)
    25             (Design and Contingencies - $100,000)
    26         (12)  SR 0060, Beaver Valley Extension
    27             Southbound Bridge over T-535, Brighton
    28             Township, Bridge Rehabilitation               167,000
    29             (Base Construction Allocation -
    30             $153,000)
    19970S0186B0179                 - 40 -

     1             (Design and Contingencies - $14,000)
     2         (13)  SR 0060, Beaver Valley Extension
     3             Northbound Bridge over T-535, Brighton
     4             Township, Bridge Rehabilitation               178,000
     5             (Base Construction Allocation -
     6             $163,000)
     7             (Design and Contingencies - $15,000)
     8         (14)  SR 0060, Beaver Valley Expansion
     9             Bridge over SR 0151, Hopewell Township,
    10             Bridge Deck Replacement                     1,125,000
    11             (Base Construction Allocation -
    12             $1,000,000)
    13             (Design and Contingencies - $125,000)
    14         (15)  SR 0588, Riverview Road Bridge over
    15             Pine Run, Marion Township, Bridge
    16             Replacement                                   250,000
    17             (Base Construction Allocation -
    18             $150,000)
    19             (Design and Contingencies - $100,000)
    20         (16)  SR 1009, Hartzel Road Bridge over
    21             Connoquenessing Creek, Marion Township,
    22             Bridge Replacement                          1,150,000
    23             (Base Construction Allocation -
    24             $1,000,000)
    25             (Land Allocation - $50,000)
    26             (Design and Contingencies - $100,000)
    27         (17)  SR 1016, Tatko Road Bridge over Brush
    28             Creek, New Sewickley Township, Bridge
    29             Replacement                                   420,000
    30             (Base Construction Allocation -
    19970S0186B0179                 - 41 -

     1             $300,000)
     2             (Land Allocation - $20,000)
     3             (Design and Contingencies - $100,000)
     4         (18)  SR 1032, New York Avenue Bridge over
     5             Conrail, SR 1032 and Local Street,
     6             Rochester Borough, Bridge
     7             Rehabilitation                              3,100,000
     8             (Base Construction Allocation -
     9             $3,000,000)
    10             (Design and Contingencies - $100,000)
    11         (19)  SR 4035, Sebring Road Bridge over SR
    12             0060, Brighton Township, Bridge
    13             Rehabilitation                                394,000
    14             (Base Construction Allocation -
    15             $361,000)
    16             (Design and Contingencies - $33,000)
    17  Section 9.  Bedford County.
    18     (a)  Local Bridges
    19         (1)  Broad Top Township, T-550, Mosquito
    20             Bridge over Six Mile Run, Bridge
    21             Replacement                                   505,000
    22             (Base Construction Allocation -
    23             $400,000)
    24             (Land Allocation - $10,000)
    25             (Design and Contingencies - $95,000)
    26         (2)  Broad Top Township, T-553, Langdondale
    27             Bridge over Sandy Run, Bridge
    28             Replacement                                   395,000
    29             (Base Construction Allocation -
    30             $300,000)
    19970S0186B0179                 - 42 -

     1             (Land Allocation - $10,000)
     2             (Design and Contingencies - $85,000)
     3         (3)  Broad Top Township, T-583, Longs Run
     4             Bridge over Longs Run, Bridge
     5             Replacement                                   395,000
     6             (Base Construction Allocation -
     7             $300,000)
     8             (Land Allocation - $10,000)
     9             (Design and Contingencies - $85,000)
    10         (4)  Harrison Township, T-418, Turner
    11             Covered Bridge over Juniata River,
    12             Bridge Rehabilitation                         825,000
    13             (Base Construction Allocation -
    14             $700,000)
    15             (Land Allocation - $25,000)
    16             (Design and Contingencies - $100,000)
    17         (5)  Monroe Township, T-354, Sideling Hill
    18             over East Branch Sideling Hill Creek,
    19             Bridge Replacement                            335,000
    20             (Base Construction Allocation -
    21             $250,000)
    22             (Land Allocation - $10,000)
    23             (Design and Contingencies - $75,000)
    24         (6)  South Woodbury Township, T-705 over
    25             Three Springs Run, Bridge Replacement         450,000
    26             (Base Construction Allocation -
    27             $325,000)
    28             (Land Allocation - $50,000)
    29             (Design and Contingencies - $75,000)
    30         (7)  West St. Clair Township, T-565 over
    19970S0186B0179                 - 43 -

     1             Dunning Creek, Bridge Replacement             550,000
     2             (Base Construction Allocation -
     3             $450,000)
     4             (Land Allocation - $25,000)
     5             (Design and Contingencies - $75,000)
     6         (8)  Londonderry Township, T-653 over Wills
     7             Creek, Bridge Replacement                     945,000
     8             (Base Construction Allocation -
     9             $850,000)
    10             (Land Allocation - $20,000)
    11             (Design and Contingencies - $75,000)
    12         (9)  East Providence Township, T-419 over
    13             Brush Creek, Bridge Replacement             1,170,000
    14             (Base Construction Allocation -
    15             $1,000,000)
    16             (Land Allocation - $20,000)
    17             (Design and Contingencies - $150,000)
    18         (10)  Broadtop Township, T-677, Riddlesburg
    19             Bridge, County Bridge No.35 over Six
    20             Mile Run, Bridge Replacement                  190,000
    21             (Base Construction Allocation -
    22             $150,000)
    23             (Land Allocation - $5,000)
    24             Design and Contingencies - $35,000)
    25     (b)  State Bridges
    26         (1)  SR 0220, US 220, Northbound Bridge
    27             over Pennsylvania Turnpike, Bedford
    28             Township, Bridge Painting                     180,000
    29             (Base Construction Allocation -
    30             $150,000)
    19970S0186B0179                 - 44 -

     1             (Design and Contingencies - $30,000)
     2         (2)  SR 0220, US 220, Southbound Bridge
     3             over Pennsylvania Turnpike, Bedford
     4             Township, Bridge Painting                     170,000
     5             (Base Construction Allocation -
     6             $140,000)
     7             (Design and Contingencies - $30,000)
     8  Section 10.  Berks County.
     9     (a)  Local Bridges
    10         (1)  City of Reading, Fritz Island Bridge
    11             over Angelica Creek, Bridge
    12             Rehabilitation                                 23,000
    13             (Base Construction Allocation -
    14             $20,000)
    15             (Design and Contingencies - $3,000)
    16         (2)  City of Reading, Bernadine Street over
    17             Angelica Creek, Bridge Rehabilitation         175,000
    18             (Base Construction Allocation -
    19             $145,000)
    20             (Design and Contingencies - $30,000)
    21         (3)  City of Reading, Tulpehocken Street
    22             Footbridge, Bridge Rehabilitation               6,000
    23             (Base Construction Allocation - $5,000)
    24             (Design and Contingencies - $1,000)
    25         (4)  West Reading Borough, Museum Road over
    26             Wyomissing Creek, Bridge
    27             Rehabilitation                                 15,000
    28             (Base Construction Allocation -
    29             $12,000)
    30             (Design and Contingencies - $3,000)
    19970S0186B0179                 - 45 -

     1         (5)  Amity Township, Lake Drive over
     2             Tributary of Schuylkill River, Bridge
     3             Rehabilitation                                 86,000
     4             (Base Construction Allocation -
     5             $75,000)
     6             (Design and Contingencies - $11,000)
     7         (6)  Amity Township, Browns Mill Road over
     8             Spring Creek, Bridge Rehabilitation             6,000
     9             (Base Construction Allocation - $5,000)
    10             (Design and Contingencies - $1,000)
    11         (7)  Amity Township, Valley Road over
    12             Spring Creek, Bridge Rehabilitation            10,000
    13             (Base Construction Allocation - $8,000)
    14             (Design and Contingencies - $2,000)
    15         (8)  Amity Township, Monocacy Road over
    16             Monocacy Creek, Bridge Rehabilitation          11,000
    17             (Base Construction Allocation - $9,000)
    18             (Design and Contingencies - $2,000)
    19         (9)  Bethel Township, T-492 over Little
    20             Swatara Creek, Bridge Replacement             700,000
    21             (Base Construction Allocation -
    22             $500,000)
    23             (Land Allocation - $50,000)
    24             (Design and Contingencies - $150,000)
    25         (10)  Bethel Township, T-682 over Crosskill
    26             Creek, Bridge Replacement                     750,000
    27             (Base Construction Allocation -
    28             $550,000)
    29             (Land Allocation - $50,000)
    30             (Design and Contingencies - $150,000)
    19970S0186B0179                 - 46 -

     1         (11)  Lenhartsville Borough, Penn Avenue
     2             over Maiden Creek, Bridge Replacement         960,000
     3             (Base Construction Allocation -
     4             $750,000)
     5             (Land Allocation - $10,000)
     6             (Design and Contingencies - $200,000)
     7         (12)  Mohnton Borough, Main Street over
     8             Wyomissing Creek, Bridge Replacement          750,000
     9             (Base Construction Allocation -
    10             $550,000)
    11             (Land Allocation - $50,000)
    12             (Design and Contingencies - $150,000)
    13         (13)  Muhlenberg Township, Hain Avenue over
    14             Laurel Run, Bridge Rehabilitation             100,000
    15             (Base Construction Allocation -
    16             $80,000)
    17             (Design and Contingencies - $20,000)
    18         (14)  Oley Township, T-500 over Furnace
    19             Creek, Bridge Replacement                     700,000
    20             (Base Construction Allocation -
    21             $500,000)
    22             (Land Allocation - $50,000)
    23             (Design and Contingencies - $150,000)
    24         (15)  Robesonia Borough, Freeman Street
    25             over Furnace Creek, Bridge Replacement        700,000
    26             (Base Construction Allocation -
    27             $500,000)
    28             (Land Allocation - $50,000)
    29             (Design and Contingencies - $150,000)
    30         (16)  Washington Township, T-884 over Swamp
    19970S0186B0179                 - 47 -

     1             Creek, Bridge Replacement                     700,000
     2             (Base Construction Allocation -
     3             $500,000)
     4             (Land Allocation - $50,000)
     5             (Design and Contingencies - $150,000)
     6         (17)  Upper Bern Township, Mill Hill Road,
     7             T-712 over Mill Creek, Bridge
     8             Replacement                                    70,000
     9             (Base Construction Allocation -
    10             $40,000)
    11             (Land Allocation - $10,000)
    12             (Design and Contingencies - $20,000)
    13     (b)  State Bridges
    14         (1)  SR 0010, Reading Road over Tributary
    15             of Conestoga Creek, Caernarvon
    16             Township, Bridge Rehabilitation               775,000
    17             (Base Construction Allocation -
    18             $490,000)
    19             (Land Allocation - $100,000)
    20             (Design and Contingencies - $185,000)
    21         (2)  SR 0222, SR 0222 Northbound over SR
    22             0737 Exit, Maxatawny Township, Bridge
    23             Painting                                       45,000
    24             (Base Construction Allocation -
    25             $45,000)
    26         (3)  SR 0222, North Elm Street over SR
    27             0222, Kutztown Borough, Bridge
    28             Painting                                       45,000
    29             (Base Construction Allocation -
    30             $45,000)
    19970S0186B0179                 - 48 -

     1         (4)  SR 0222, SR 0222 Northbound over SR
     2             8015, Ramp G, Maxatawny Township,
     3             Bridge Painting                                45,000
     4             (Base Construction Allocation -
     5             $45,000)
     6         (5)  SR 0222, SR 0222 Southbound over SR
     7             8015, Ramp G, Maxatawny Township,
     8             Bridge Painting                                45,000
     9             (Base Construction Allocation -
    10             $45,000)
    11         (6)  SR 2038, Grist Mill Road over
    12             Ironstone Creek, Douglass Township,
    13             Bridge Replacement                            405,000
    14             (Base Construction Allocation -
    15             $235,000)
    16             (Land Allocation - $70,000)
    17             (Design and Contingencies - $100,000)
    18         (7)  SR 0073, Bridge over Railroad, Maiden
    19             Creek Township, Bridge Rehabilitation          14,000
    20             (Base Construction Allocation -
    21             $12,000)
    22             (Design and Contingencies - $2,000)
    23         (8)  SR 2014, Spring Street Subway, City of
    24             Reading, Bridge Rehabilitation                 18,000
    25             (Base Construction Allocation -
    26             $15,000)
    27             (Design and Contingencies - $3,000)
    28         (9)  SR 0073, SR 0073 over Manatawny Creek,
    29             Oley Township, Bridge Rehabilitation          500,000
    30             (Base Construction Allocation -
    19970S0186B0179                 - 49 -

     1             $450,000)
     2             (Design and Contingencies - $50,000)
     3         (10)  SR 0061, SR 0061 over Blue Mountain
     4             Railroad, Borough of Hamburg, Bridge
     5             Rehabilitation                                200,000
     6             (Base Construction Allocation -
     7             $175,000)
     8             (Design and Contingencies - $25,000)
     9         (11)  SR 0078, SR 0078 over SR 1024,
    10             Greenwich Township, Bridge
    11             Rehabilitation                                500,000
    12             (Base Construction Allocation -
    13             $450,000)
    14             (Design and Contingencies - $50,000)
    15         (12)  SR 0078, SR 0078 over T-808, Windsor
    16             Township, Bridge Rehabilitation               500,000
    17             (Base Construction Allocation -
    18             $450,000)
    19             (Design and Contingencies - $50,000)
    20         (13)  SR 0078, SR 0078 over Fifth Street,
    21             Borough of Hamburg, Bridge
    22             Rehabilitation                                200,000
    23             (Base Construction Allocation -
    24             $175,000)
    25             (Design and Contingencies - $25,000)
    26         (14)  SR 0078, SR 0078 over T-688, Bethel
    27             Township, Bridge Rehabilitation               250,000
    28             (Base Construction Allocation -
    29             $225,000)
    30             (Design and Contingencies - $25,000)
    19970S0186B0179                 - 50 -

     1         (15)  SR 0176, SR 0176 over T-568, Robeson
     2             Township, Bridge Rehabilitation               250,000
     3             (Base Construction Allocation -
     4             $200,000)
     5             (Design and Contingencies - $50,000)
     6         (16)  SR 0176, SR 0176 2/10 mile south of
     7             SR 0422, Cumru Township, Bridge
     8             Rehabilitation                                350,000
     9             (Base Construction Allocation -
    10             $300,000)
    11             (Design and Contingencies - $50,000)
    12         (17)  SR 1083, SR 0183 over Little
    13             Northkill Creek, Jefferson Township,
    14             Bridge Replacement                          1,000,000
    15             (Base Construction Allocation -
    16             $750,000)
    17             (Land Allocation - $100,000)
    18             (Design and Contingencies - $150,000)
    19         (18)  SR 0222, SR 0222 over Abandoned
    20             Railroad, City of Reading, Bridge
    21             Rehabilitation                                200,000
    22             (Base Construction Allocation -
    23             $150,000)
    24             (Design and Contingencies - $50,000)
    25         (19)  SR 0422, SR 0422 over Tulpehocken
    26             Creek, Borough of Womelsdorf, Bridge
    27             Rehabilitation                                200,000
    28             (Base Construction Allocation -
    29             $150,000)
    30             (Design and Contingencies - $50,000)
    19970S0186B0179                 - 51 -

     1         (20)  SR 0568, SR 0568 over Allegheny
     2             Creek, Robeson Township, Bridge
     3             Rehabilitation                                100,000
     4             (Base Construction Allocation -
     5             $80,000)
     6             (Design and Contingencies - $20,000)
     7         (21)  SR 0737, SR 0737 2.63 miles north of
     8             Kutztown, Greenwich Township, Bridge
     9             Rehabilitation                                500,000
    10             (Base Construction Allocation -
    11             $450,000)
    12             (Design and Contingencies - $50,000)
    13         (22)  SR 0737, SR 0737 2.82 miles north of
    14             Kutztown, Greenwich Township, Bridge
    15             Rehabilitation                                500,000
    16             (Base Construction Allocation -
    17             $450,000)
    18             (Design and Contingencies - $50,000)
    19         (23)  SR 2025, SR 2025 1/2 mile east of SR
    20             0422, Amity Township, Bridge
    21             Replacement                                   300,000
    22             (Base Construction Allocation -
    23             $200,000)
    24             (Land Allocation - $15,000)
    25             (Design and Contingencies - $85,000)
    26         (24)  SR 2031, SR 2031 over Hay Creek,
    27             Robeson Township, Bridge
    28             Rehabilitation                                500,000
    29             (Base Construction Allocation -
    30             $450,000)
    19970S0186B0179                 - 52 -

     1             (Design and Contingencies - $50,000)
     2         (25)  SR 2032, SR 2032 over Tributary of
     3             Swamp Creek, Washington Township,
     4             Bridge Replacement                            500,000
     5             (Base Construction Allocation -
     6             $375,000)
     7             (Land Allocation - $25,000)
     8             (Design and Contingencies - $100,000)
     9         (26)  SR 2039, SR 2039 over SR 0422, Exeter
    10             Township, Bridge Replacement                2,750,000
    11             (Base Construction Allocation -
    12             $2,000,000)
    13             (Land Allocation - $250,000)
    14             (Design and Contingencies - $500,000)
    15         (27)  SR 2041, SR 2041 2 miles west of
    16             Weavertown, Amity Township, Bridge
    17             Replacement                                   200,000
    18             (Base Construction Allocation -
    19             $125,000)
    20             (Land Allocation - $15,000)
    21             (Design and Contingencies - $60,000)
    22         (28)  SR 2057, SR 2057 over Leaf Creek,
    23             Amity Township, Bridge Replacement            600,000
    24             (Base Construction Allocation -
    25             $425,000)
    26             (Land Allocation - $25,000)
    27             (Design and Contingencies - $150,000)
    28         (29)  SR 3003, SR 3003 over Angelica Creek,
    29             Cumru Township, Bridge Replacement            200,000
    30             (Base Construction Allocation -
    19970S0186B0179                 - 53 -

     1             $125,000)
     2             (Land Allocation - $15,000)
     3             (Design and Contingencies - $60,000)
     4         (30)  SR 4026, SR 4026 over Irish Creek,
     5             Borough of Centerport, Bridge
     6             Rehabilitation                                250,000
     7             (Base Construction Allocation -
     8             $225,000)
     9             (Design and Contingencies - $25,000)
    10  Section 11.  Blair County.
    11     (a)  Local Bridges
    12         (1)  Antis Township, T-490, Becker Road
    13             Bridge over Tributary of Little Juniata
    14             River, Bridge Replacement                     310,000
    15             (Base Construction Allocation -
    16             $250,000)
    17             (Land Allocation - $10,000)
    18             (Design and Contingencies - $50,000)
    19         (2)  Taylor Township, T-332, Halter Creek
    20             Bridge over Halter Creek, Bridge
    21             Replacement                                   395,000
    22             (Base Construction Allocation -
    23             $300,000)
    24             (Land Allocation - $10,000)
    25             (Design and Contingencies - $85,000)
    26         (3)  Greenfield Township, T-531 over South
    27             Poplar Run, Construct new bridge              280,000
    28             (Base Construction Allocation -
    29             $200,000)
    30             (Land Allocation - $20,000)
    19970S0186B0179                 - 54 -

     1             (Design and Contingencies - $60,000)
     2         (4)  Greenfield Township, T-531 over Big
     3             Lick Branch of South Poplar Run, Bridge
     4             Replacement                                   565,000
     5             (Base Construction Allocation -
     6             $465,000)
     7             (Land Allocation - $30,000)
     8             (Design and Contingencies - $70,000)
     9         (5)  Greenfield Township, County Road 101
    10             over Polecat Run, Bridge Replacement          520,000
    11             (Base Construction Allocation -
    12             $400,000)
    13             (Land Allocation - $20,000)
    14             (Design and Contingencies - $100,000)
    15         (6)  Newry Borough, Allegheny Street over
    16             Tributary of Poplar Run, Bridge
    17             Rehabilitation                                425,000
    18             (Base Construction Allocation -
    19             $350,000)
    20             (Land Allocation - $25,000)
    21             (Design and Contingencies - $50,000)
    22     (b)  State bridges
    23         (1)  SR 0022, Canal Park Bridges over the
    24             Juniata River, Hollidaysburg Borough,
    25             Bridge Replacement                          3,000,000
    26             (Base Construction Allocation -
    27             $2,000,000)
    28             (Land Allocation - $650,000)
    29             (Design and Contingencies - $350,000)
    30         (2)  SR 4008, SR 4008 over Tributary of
    19970S0186B0179                 - 55 -

     1             Glenwhite Run, Logan Township, Bridge
     2             Replacement                                   240,000
     3             (Base Construction Allocation -
     4             $200,000)
     5             (Land Allocation - $5,000)
     6             (Design and Contingencies - $35,000)
     7  Section 12.  Bradford County.
     8     (a)  Local Bridges
     9         (1)  Burlington Township, T-547 over Wallis
    10             Run, Bridge Replacement                       395,000
    11             (Base Construction Allocation -
    12             $310,000)
    13             (Land Allocation - $10,000)
    14             (Design and Contingencies - $75,000)
    15         (2)  Pike Township, T-790 over Gaylord
    16             Creek and South Creek, Bridge
    17             Replacement                                   495,000
    18             (Base Construction Allocation -
    19             $410,000)
    20             (Land Allocation - $10,000)
    21             (Design and Contingencies - $75,000)
    22     (b)  State Bridges
    23         (1)  SR 0006, North Bridge over Sugar
    24             Creek, South of Longs Pond Road, Bridge
    25             Replacement                                 1,139,000
    26             (Base Construction Allocation -
    27             $911,000)
    28             (Land Allocation - $57,000)
    29             (Design and Contingencies - $171,000)
    30         (2)  SR 0409, Billing Creek Bridge, Village
    19970S0186B0179                 - 56 -

     1             of Camptown, Bridge Replacement               318,000
     2             (Base Construction Allocation -
     3             $254,000)
     4             (Land Allocation - $16,000)
     5             (Design and Contingencies - $48,000)
     6         (3)  SR 3029, Towanda Creek Bridges between
     7             T-327 and T-326 on Gulf Road, Village
     8             of Granville Center, Bridge
     9             Replacement                                   593,000
    10             (Base Construction Allocation -
    11             $474,000)
    12             (Land Allocation - $30,000)
    13             (Design and Contingencies - $89,000)
    14         (4)  SR 4008, Bridge over Tributary of
    15             Sugar Creek, Columbia Township, Bridge
    16             Replacement                                   298,000
    17             (Base Construction Allocation -
    18             $238,000)
    19             (Land Allocation - $15,000)
    20             (Design and Contingencies - $45,000)
    21         (5)  SR 0414, Bridge over Towanda Creek,
    22             Bradford Borough, Bridge Painting             195,000
    23             (Base Construction Allocation -
    24             $185,000)
    25             (Design and Contingencies - $10,000)
    26         (6)  US 6, US 6 over Sugar Creek, Sylvania
    27             Borough, Bridge Replacement                   633,000
    28             (Base Construction Allocation -
    29             $506,000)
    30             (Land Allocation - $32,000)
    19970S0186B0179                 - 57 -

     1             (Design and Contingencies - $95,000)
     2         (7)  SR 0014, SR 0014 over Tributary of
     3             Sugar Creek, Troy Township, Bridge
     4             Replacement                                   410,000
     5             (Base Construction Allocation -
     6             $280,000)
     7             (Land Allocation - $30,000)
     8             (Design and Contingencies - $100,000)
     9         (8)  SR 0187, SR 0187 over Wappensing
    10             Creek, Windham Township, Bridge
    11             Replacement                                 2,000,000
    12             (Base Construction Allocation -
    13             $1,600,000)
    14             (Land Allocation - $100,000)
    15             (Design and Contingencies - $300,000)
    16         (9)  SR 0414, SR 0414 over Tributary of
    17             Towanda Creek, Canton Township, Bridge
    18             Replacement                                   320,000
    19             (Base Construction Allocation -
    20             $256,000)
    21             (Land Allocation - $16,000)
    22             (Design and Contingencies - $48,000)
    23         (10)  SR 0467, SR 0467 over Johnsons Creek,
    24             Orwell Township, Bridge Replacement           751,000
    25             (Base Construction Allocation -
    26             $601,000)
    27             (Land Allocation - $37,000)
    28             (Design and Contingencies - $113,000)
    29         (11)  SR 0514, SR 0514 over North Branch of
    30             Towanda Creek, Granville Township,
    19970S0186B0179                 - 58 -

     1             Bridge Replacement                            638,000
     2             (Base Construction Allocation -
     3             $510,000)
     4             (Land Allocation - $32,000)
     5             (Design and Contingencies - $96,000)
     6         (12)  SR 1022, Ulster Bridge, Ulster
     7             Township, Bridge Painting                   6,299,000
     8             (Base Construction Allocation -
     9             $5,039,000)
    10             (Land Allocation - $315,000)
    11             (Design and Contingencies - $945,000)
    12         (13)  SR 1026, SR 1026 over Wyalusing
    13             Creek, Pike Township, Bridge
    14             Replacement                                   650,000
    15             (Base Construction Allocation -
    16             $520,000)
    17             (Land Allocation - $30,000)
    18             (Design and Contingencies - $100,000)
    19         (14)  SR 1049, SR 1049 over Tributary of
    20             Pendleton Creek, Warren Township,
    21             Bridge Replacement                            340,000
    22             (Base Construction Allocation -
    23             $270,000)
    24             (Land Allocation - $15,000)
    25             (Design and Contingencies - $55,000)
    26         (15)  SR 1055, SR 1055 over Parks Creek,
    27             Rome Township, Bridge Replacement             315,000
    28             (Base Construction Allocation -
    29             $250,000)
    30             (Land Allocation - $15,000)
    19970S0186B0179                 - 59 -

     1             (Design and Contingencies - $50,000)
     2         (16)  SR 2018, SR 2018 over Tributary of
     3             Susquehanna River, Asylum Township,
     4             Bridge Replacement                            260,000
     5             (Base Construction Allocation -
     6             $208,000)
     7             (Land Allocation - $39,000)
     8             (Design and Contingencies - $13,000)
     9         (17)  SR 3005, SR 3005 over Towanda Creek,
    10             Canton Township, Bridge Replacement           666,000
    11             (Base Construction Allocation -
    12             $533,000)
    13             (Land Allocation - $33,000)
    14             (Design and Contingencies - $100,000)
    15         (18)  SR 3029, SR 3029 over Mud Creek, Troy
    16             Township, Bridge Replacement                  457,000
    17             (Base Construction Allocation -
    18             $366,000)
    19             (Land Allocation - $23,000)
    20             (Design and Contingencies - $68,000)
    21         (19)  SR 4002, SR 4002 over Browns Creek,
    22             Burlington Township, Bridge
    23             Replacement                                   561,000
    24             (Base Construction Allocation -
    25             $449,000)
    26             (Land Allocation - $28,000)
    27             (Design and Contingencies - $84,000)
    28         (20)  SR 4013, SR 4013 over Justice Run,
    29             Ridgebury Township, Bridge Replacement        351,000
    30             (Base Construction Allocation -
    19970S0186B0179                 - 60 -

     1             $281,000)
     2             (Land Allocation - $18,000)
     3             (Design and Contingencies - $52,000)
     4         (21)  SR 4014, SR 4014 over Branch of
     5             Tomjack Creek, Smithfield Township,
     6             Bridge Replacement                            360,000
     7             (Base Construction Allocation -
     8             $288,000)
     9             (Land Allocation - $18,000)
    10             (Design and Contingencies - $54,000)
    11         (22)  SR 4015, SR 4015 over Mill Creek,
    12             Springfield Township, Bridge
    13             Replacement                                   390,000
    14             (Base Construction Allocation -
    15             $312,000)
    16             (Land Allocation - $20,000)
    17             (Design and Contingencies - $58,000)
    18         (23)  SR 4031, SR 4031 over Tributary of
    19             Beckwith Creek, Wells Township, Bridge
    20             Replacement                                   243,000
    21             (Base Construction Allocation -
    22             $196,000)
    23             (Land Allocation - $10,000)
    24             (Design and Contingencies - $37,000)
    25  Section 13.  Bucks County.
    26     (a)  Local Bridges
    27         (1)  Springfield Township, I-479, Bridge
    28             Street Bridge over Cooks Creek, Bridge
    29             Replacement                                   500,000
    30             (Base Construction Allocation -
    19970S0186B0179                 - 61 -

     1             $365,000)
     2             (Land Allocation - $35,000)
     3             (Design and Contingencies - $100,000)
     4         (2)  Springfield Township, T-404, Hawks
     5             Mill County Bridge No.196, Shale Road
     6             over Cooks Creek, Bridge
     7             Rehabilitation                                100,000
     8             (Base Construction Allocation -
     9             $90,000)
    10             (Design and Contingencies - $10,000)
    11     (b)  State Bridges
    12         (1)  SR 0032, River Road at Fleecydale over
    13             Paunacussing Creek, Solebury Township,
    14             Bridge Replacement                          1,400,000
    15             (Base Construction Allocation -
    16             $1,200,000)
    17             (Design and Contingencies - $200,000)
    18         (2)  SR 2002, Otter Street Bridge over
    19             Otter Creek, Bristol Borough, Bridge
    20             Replacement                                 1,150,000
    21             (Base Construction Allocation -
    22             $900,000)
    23             (Land Allocation - $50,000)
    24             (Design and Contingencies - $200,000)
    25         (3)  SR 2025, Bristol Road Bridge over
    26             Little Neshaminy Creek, Warwick
    27             Township, Bridge Replacement                1,120,000
    28             (Base Construction Allocation -
    29             $900,000)
    30             (Land Allocation - $80,000)
    19970S0186B0179                 - 62 -

     1             (Design and Contingencies - $140,000)
     2         (4)  SR 2047, Hulmeville Avenue Bridge over
     3             Conrail, Middletown, Bridge
     4             Replacement                                 5,600,000
     5             (Base Construction Allocation -
     6             $4,000,000)
     7             (Land Allocation - $800,000)
     8             (Design and Contingencies - $800,000)
     9         (5)  SR 4033, Upper Ridge Road Bridge over
    10             Unami Creek, Milford Township, Bridge
    11             Replacement                                 2,000,000
    12             (Base Construction Allocation -
    13             $1,600,000)
    14             (Land Allocation - $100,000)
    15             (Design and Contingencies - $300,000)
    16         (6)  SR 4091, Kellers Church Road Bridge
    17             over Deep Run, Bedminster, Bridge
    18             Replacement                                 2,000,000
    19             (Base Construction Allocation -
    20             $1,500,000)
    21             (Land Allocation - $150,000)
    22             (Design and Contingencies - $350,000)
    23         (7)  SR 0202, Doylestown Bypass (Five
    24             Bridges) over SR 0611, Doylestown
    25             Township, Bridge Rehabilitations            2,200,000
    26             (Base Construction Allocation -
    27             $2,000,000)
    28             (Land Allocation - $50,000)
    29             (Design and Contingencies - $150,000)
    30         (8)  SR 0611, Easton Road (Two Bridges)
    19970S0186B0179                 - 63 -

     1             over Tohickon and Deep Run Creeks,
     2             Bedminister Township, Bridge
     3             Replacements                                1,650,000
     4             (Base Construction Allocation -
     5             $1,500,000)
     6             (Land Allocation - $50,000)
     7             (Design and Contingencies - $100,000)
     8         (9)  SR 2089, Almshouse Road Bridge over
     9             Neshaminy Creek, Doylestown Township,
    10             Bridge Replacement                          1,800,000
    11             (Base Construction Allocation -
    12             $1,500,000)
    13             (Land Allocation - $150,000)
    14             (Design and Contingencies - $150,000)
    15         (10)  SR 0013, Bristol Pike over Otter
    16             Creek, Bristol Township, Bridge
    17             Replacement                                 1,600,000
    18             (Base Construction Allocation -
    19             $1,200,000)
    20             (Land Allocation - $100,000)
    21             (Design and Contingencies - $300,000)
    22         (11)  SR 0413, Bridge over Mill Creek,
    23             Bristol Township, Bridge Replacement          600,000
    24             (Base Construction Allocation -
    25             $350,000)
    26             (Land Allocation - $50,000)
    27             (Design and Contingencies - $200,000)
    28         (12)  SR 2002, State Road over Neshaminy
    29             Creek, Bristol Township, Bridge
    30             Replacement                                 3,700,000
    19970S0186B0179                 - 64 -

     1             (Base Construction Allocation -
     2             $3,000,000)
     3             (Land Allocation - $250,000)
     4             (Design and Contingencies - $450,000)
     5         (13)  SR 0013, Bristol Pike over St.
     6             Francis Creek, Bensalem Township,
     7             Bridge Replacement                            550,000
     8             (Base Construction Allocation -
     9             $400,000)
    10             (Land Allocation - $50,000)
    11             (Design and Contingencies - $100,000)
    12         (14)  SR 0013, SR 0013 over Conrail and
    13             Newbold Road, Falls Township, Bridge
    14             Replacement                                 5,000,000
    15             (Base Construction Allocation -
    16             $4,500,000)
    17             (Land Allocation - $150,000)
    18             (Design and Contingencies - $350,000)
    19         (15)  SR 0032, West Bridge Street over
    20             Tributary of Delaware River,
    21             Morrisville Borough, Bridge
    22             Replacement                                   550,000
    23             (Base Construction Allocation -
    24             $400,000)
    25             (Land Allocation - $50,000)
    26             (Design and Contingencies - $100,000)
    27         (16)  SR 0213, West Maple Avenue over
    28             Neshaminy Creek, Middletown Township,
    29             Bridge Replacement                          2,000,000
    30             (Base Construction Allocation -
    19970S0186B0179                 - 65 -

     1             $1,700,000)
     2             (Land Allocation - $100,000)
     3             (Design and Contingencies - $200,000)
     4         (17)  SR 1004, Cold Spring Creamery Road
     5             over Branch of Pine Run Creek,
     6             Buckingham Township, Bridge
     7             Replacement                                   450,000
     8             (Base Construction Allocation -
     9             $380,000)
    10             (Land Allocation - $10,000)
    11             (Design and Contingencies - $60,000)
    12         (18)  SR 2005, Cornwells Avenue over
    13             Poquessing Creek, Bensalem Township,
    14             Bridge Replacement                            350,000
    15             (Base Construction Allocation -
    16             $250,000)
    17             (Land Allocation - $25,000)
    18             (Design and Contingencies - $75,000)
    19         (19)  SR 2026, Trenton Avenue over Rock
    20             Run, Falls Township, Bridge
    21             Replacement                                   700,000
    22             (Base Construction Allocation -
    23             $500,000)
    24             (Land Allocation - $50,000)
    25             (Design and Contingencies - $150,000)
    26         (20)  SR 2037, Lincoln Highway Eastbound
    27             over Queen Anne Creek, Falls Township,
    28             Bridge Replacement                            700,000
    29             (Base Construction Allocation -
    30             $500,000)
    19970S0186B0179                 - 66 -

     1             (Land Allocation - $75,000)
     2             (Design and Contingencies - $125,000)
     3         (21)  SR 2037, Lincoln Highway over Branch
     4             of Queen Anne Creek, Falls Township,
     5             Bridge Replacement                            500,000
     6             (Base Construction Allocation -
     7             $350,000)
     8             (Land Allocation - $50,000)
     9             (Design and Contingencies - $100,000)
    10         (22)  SR 2047, Hulmeville Avenue over
    11             Conrail, Middletown Township, Bridge
    12             Replacement                                 1,200,000
    13             (Base Construction Allocation -
    14             $1,000,000)
    15             (Land Allocation - $75,000)
    16             (Design and Contingencies - $125,000)
    17  Section 14.  Butler County.
    18     (a)  Local Bridges
    19         (1)  Muddy Creek and Worth Townships, T-
    20             348, Muddy Creek Bridge over Muddy
    21             Creek, Bridge Replacement                     730,000
    22             (Base Construction Allocation -
    23             $550,000)
    24             (Land Allocation - $15,000)
    25             (Design and Contingencies - $165,000)
    26         (2)  Allegheny Township, T-542, Farrington
    27             Bridge, Bridge Replacement                    700,000
    28             (Base Construction Allocation -
    29             $500,000)
    30             (Land Allocation - $25,000)
    19970S0186B0179                 - 67 -

     1             (Design and Contingencies - $175,000)
     2         (3)  Concord Township, T-508, Greece City
     3             Bridge, Bridge Replacement                    700,000
     4             (Base Construction Allocation -
     5             $500,000)
     6             (Land Allocation - $25,000)
     7             (Design and Contingencies - $175,000)
     8         (4)  Cranberry Township, T-326 over Brush
     9             Creek, Bridge Replacement                     700,000
    10             (Base Construction Allocation -
    11             $500,000)
    12             (Land Allocation - $25,000)
    13             (Design and Contingencies - $175,000)
    14         (5)  Cranberry Township, T-300, Bridge
    15             Replacement                                   700,000
    16             (Base Construction Allocation -
    17             $500,000)
    18             (Land Allocation - $25,000)
    19             (Design and Contingencies - $175,000)
    20         (6)  Jackson Township, T-323, Senn Bridge,
    21             Bridge Replacement                            700,000
    22             (Base Construction Allocation -
    23             $500,000)
    24             (Land Allocation - $25,000)
    25             (Design and Contingencies - $175,000)
    26         (7)  Jackson Township, T-325, Eidewau
    27             Bridge, Bridge Replacement                    700,000
    28             (Base Construction Allocation -
    29             $500,000)
    30             (Land Allocation - $25,000)
    19970S0186B0179                 - 68 -

     1             (Design and Contingencies - $175,000)
     2         (8)  Jefferson Township, T-844 over Thorn
     3             Creek, Bridge Replacement                     700,000
     4             (Base Construction Allocation -
     5             $500,000)
     6             (Land Allocation - $25,000)
     7             (Design and Contingencies - $175,000)
     8         (9)  Mars Borough, Hook Street, Bridge
     9             Replacement                                   700,000
    10             (Base Construction Allocation -
    11             $500,000)
    12             (Land Allocation - $25,000)
    13             (Design and Contingencies - $175,000)
    14         (10)  Mars Borough, Church Street, Kocher
    15             Bridge, Bridge Replacement                    700,000
    16             (Base Construction Allocation -
    17             $500,000)
    18             (Land Allocation - $25,000)
    19             (Design and Contingencies - $175,000)
    20         (11)  Middlesex Township, T-380 over Glade
    21             Run, Bridge Replacement                       700,000
    22             (Base Construction Allocation -
    23             $500,000)
    24             (Land Allocation - $25,000)
    25             (Design and Contingencies - $175,000)
    26         (12)  Worth Township, T-318, Payne Bridge,
    27             Bridge Replacement                            700,000
    28             (Base Construction Allocation -
    29             $500,000)
    30             (Land Allocation - $25,000)
    19970S0186B0179                 - 69 -

     1             (Design and Contingencies - $175,000)
     2         (13)  Cranberry Township, T-326 over
     3             Tributary of Brush Creek, Bridge
     4             Replacement                                   167,000
     5             (Base Construction Allocation -
     6             $135,000)
     7             (Land Allocation - $19,000)
     8             (Design and Contingencies - $13,000)
     9     (b)  State Bridges
    10         (1)  SR 0228, Houseville Bridge over B&LE
    11             Railroad, Clinton Township, Bridge Deck
    12             Replacement                                   636,000
    13             (Base Construction Allocation -
    14             $600,000)
    15             (Design and Contingencies - $36,000)
    16         (2)  SR 0019, Rose Point Bridge over SR
    17             0422, Muddycreek Township, Bridge
    18             Painting                                      115,000
    19             (Base Construction Allocation -
    20             $100,000)
    21             (Design and Contingencies - $15,000)
    22         (3)  SR 0058, Blocks Run Bridge No.1 over
    23             Blocks Run, Marion Township, Bridge
    24             Painting                                       65,000
    25             (Base Construction Allocation -
    26             $50,000)
    27             (Design and Contingencies - $15,000)
    28         (4)  SR 0058, Blocks Run Bridge No.2 over
    29             Blocks Run, Venango Township, Bridge
    30             Painting                                       60,000
    19970S0186B0179                 - 70 -

     1             (Base Construction Allocation -
     2             $45,000)
     3             (Design and Contingencies - $15,000)
     4         (5)  SR 0058, Murrin Run Bridge over Murrin
     5             Run, Venango Township, Bridge Painting         60,000
     6             (Base Construction Allocation -
     7             $45,000)
     8             (Design and Contingencies - $15,000)
     9         (6)  SR 0068, Glade Run Bridge over Glade
    10             Run, Zelienople Borough, Bridge
    11             Painting                                       70,000
    12             (Base Construction Allocation -
    13             $55,000)
    14             (Design and Contingencies - $15,000)
    15         (7)  SR 0079, Muddy Creek Bridge Northbound
    16             over SR 0422 and Muddy Creek, Muddy
    17             Creek Township, Bridge Painting               255,000
    18             (Base Construction Allocation -
    19             $240,000)
    20             (Design and Contingencies - $15,000)
    21         (8)  SR 0079, Muddy Creek Bridge Southbound
    22             over SR 0422 and Muddy Creek, Muddy
    23             Creek Township, Bridge Painting               255,000
    24             (Base Construction Allocation -
    25             $240,000)
    26             (Design and Contingencies - $15,000)
    27         (9)  SR 0108, Slippery Rock Exit Bridge
    28             over I-79, Worth Township, Bridge
    29             Painting                                      225,000
    30             (Base Construction Allocation -
    19970S0186B0179                 - 71 -

     1             $210,000)
     2             (Design and Contingencies - $15,000)
     3         (10)  SR 0138, Glades Wildlife Lake Bridge
     4             over South Branch of Slippery Rock
     5             Creek, Concord Township, Bridge
     6             Painting                                       85,000
     7             (Base Construction Allocation -
     8             $70,000)
     9             (Design and Contingencies - $15,000)
    10         (11)  SR 0258, Wolf Creek Bridge over Wolf
    11             Creek, Slippery Rock Township, Bridge
    12             Painting                                      125,000
    13             (Base Construction Allocation -
    14             $110,000)
    15             (Design and Contingencies - $15,000)
    16         (12)  SR 0308, Renick Bridge over Stoney
    17             Run and Railroad, Center Township,
    18             Bridge Painting                               405,000
    19             (Base Construction Allocation -
    20             $390,000)
    21             (Design and Contingencies - $15,000)
    22         (13)  SR 0422, Mount Chestnut Bridge
    23             Eastbound over Little Connoquenessing
    24             Creek and SR 3007, Butler Township,
    25             Bridge Painting                               355,000
    26             (Base Construction Allocation -
    27             $340,000)
    28             (Design and Contingencies - $15,000)
    29         (14)  SR 0422, Bonnie Brook Bridge over
    30             Bonnie Brook, Summit Township, Bridge
    19970S0186B0179                 - 72 -

     1             Painting                                       90,000
     2             (Base Construction Allocation -
     3             $75,000)
     4             (Design and Contingencies - $15,000)
     5         (15)  SR 1004, Bruin Bridge over Bear
     6             Creek, Bruin Borough, Bridge Painting          85,000
     7             (Base Construction Allocation -
     8             $70,000)
     9             (Design and Contingencies - $15,000)
    10         (16)  SR 1011, Rattigan Bridge No.1 over
    11             Buffalo Creek, Donegal Township, Bridge
    12             Painting                                       55,000
    13             (Base Construction Allocation -
    14             $40,000)
    15             (Design and Contingencies - $15,000)
    16         (17)  SR 1016, Eastland Drive Bridge over
    17             Connoquenessing Creek, Butler Township,
    18             Bridge Painting                                80,000
    19             (Base Construction Allocation -
    20             $65,000)
    21             (Design and Contingencies - $15,000)
    22         (18)  SR 1019, Rough Run Bridge over Rough
    23             Run, Windfield Township, Bridge
    24             Painting                                       95,000
    25             (Base Construction Allocation -
    26             $80,000)
    27             (Design and Contingencies - $15,000)
    28         (19)  SR 1019, Chicora Bridge over Buffalo
    29             Creek, Chicora Borough, Bridge
    30             Painting                                       70,000
    19970S0186B0179                 - 73 -

     1             (Base Construction Allocation -
     2             $55,000)
     3             (Design and Contingencies - $15,000)
     4         (20)  SR 1021, Rattigan Bridge No.2 over
     5             Buffalo Creek, Donegal Township, Bridge
     6             Painting                                       70,000
     7             (Base Construction Allocation -
     8             $55,000)
     9             (Design and Contingencies - $15,000)
    10         (21)  SR 1025, Bonnie Brook Bridge No.1
    11             over Bonnie Brook, Summit Township,
    12             Bridge Painting                                90,000
    13             (Base Construction Allocation -
    14             $75,000)
    15             (Design and Contingencies - $15,000)
    16         (22)  SR 2004, Connoquenessing Creek Bridge
    17             over Connoquenessing Creek, Butler
    18             City, Bridge Painting                         135,000
    19             (Base Construction Allocation -
    20             $120,000)
    21             (Design and Contingencies - $15,000)
    22         (23)  SR 2004, Bonnie Brook Bridge No.2
    23             over Bonnie Brook, East Butler Borough,
    24             Bridge Painting                                90,000
    25             (Base Construction Allocation -
    26             $75,000)
    27             (Design and Contingencies - $15,000)
    28         (24)  SR 2011, Lardintown Run Bridge No.1
    29             over Lardintown Run, Clinton Township,
    30             Bridge Painting                                75,000
    19970S0186B0179                 - 74 -

     1             (Base Construction Allocation -
     2             $60,000)
     3             (Design and Contingencies - $15,000)
     4         (25)  SR 2011, Lardintown Run Bridge No.2
     5             over Lardintown Run, Clinton Township,
     6             Bridge Painting                                65,000
     7             (Base Construction Allocation -
     8             $50,000)
     9             (Design and Contingencies - $15,000)
    10         (26)  SR 2011, Lardintown Run Bridge No.3
    11             over Lardintown Run, Clinton Township,
    12             Bridge Painting                                65,000
    13             (Base Construction Allocation -
    14             $50,000)
    15             (Design and Contingencies - $15,000)
    16         (27)  SR 3004, McCalmont Bridge over
    17             Connoquenessing Creek, Butler Township,
    18             Bridge Painting                               105,000
    19             (Base Construction Allocation -
    20             $90,000)
    21             (Design and Contingencies - $15,000)
    22         (28)  SR 3007, Reinfrew Bridge over
    23             Connoquenessing Creek, Penn Township,
    24             Bridge Painting                               115,000
    25             (Base Construction Allocation -
    26             $100,000)
    27             (Design and Contingencies - $15,000)
    28         (29)  SR 3010, Zeno Bridge over Glade Run,
    29             Forward Township, Bridge Painting             105,000
    30             (Base Construction Allocation -
    19970S0186B0179                 - 75 -

     1             $90,000)
     2             (Design and Contingencies - $15,000)
     3         (30)  SR 3017, Kaufman Run Bridge over
     4             Kaufman Run, Adams Township, Bridge
     5             Painting                                       70,000
     6             (Base Construction Allocation -
     7             $55,000)
     8             (Design and Contingencies - $15,000)
     9         (31)  SR 3017, Breakneck Creek Bridge over
    10             Breakneck Creek, Adams Township, Bridge
    11             Painting                                      105,000
    12             (Base Construction Allocation -
    13             $90,000)
    14             (Design and Contingencies - $15,000)
    15         (32)  SR 3025, Little Connoquenessing Creek
    16             Bridge over Little Connoquenessing
    17             Creek, Lancaster Township, Bridge
    18             Painting                                      125,000
    19             (Base Construction Allocation -
    20             $110,000)
    21             (Design and Contingencies - $15,000)
    22         (33)  SR 4006, Keister's Bridge over
    23             Slippery Rock Creek, Slippery Rock
    24             Township, Bridge Painting                     105,000
    25             (Base Construction Allocation -
    26             $90,000)
    27             (Design and Contingencies - $15,000)
    28         (34)  SR 4007, Lake Arthur Tributary Bridge
    29             over a tributary of Lake Arthur, Worth
    30             Township, Bridge Painting                      50,000
    19970S0186B0179                 - 76 -

     1             (Base Construction Allocation -
     2             $35,000)
     3             (Design and Contingencies - $15,000)
     4         (35)  SR 4007, I-79 North Bridge No.1 over
     5             I-79, Worth Township, Bridge Painting         245,000
     6             (Base Construction Allocation -
     7             $230,000)
     8             (Design and Contingencies - $15,000)
     9         (36)  SR 4007, I-79 North Bridge No.2 over
    10             I-79, Worth Township, Bridge Painting         215,000
    11             (Base Construction Allocation -
    12             $200,000)
    13             (Design and Contingencies - $15,000)
    14         (37)  SR 4010, Bull Valley Bridge over Bull
    15             Valley Creek, Washington Township,
    16             Bridge Painting                                65,000
    17             (Base Construction Allocation -
    18             $50,000)
    19             (Design and Contingencies - $15,000)
    20         (38)  SR 4012, Seaton Creek Bridge over
    21             Seaton Creek, Marion Township, Bridge
    22             Painting                                       65,000
    23             (Base Construction Allocation -
    24             $50,000)
    25             (Design and Contingencies - $15,000)
    26         (39)  SR 8002, North Shore Exit Bridge over
    27             Muddy Creek, Worth Township, Bridge
    28             Painting                                       85,000
    29             (Base Construction Allocation -
    30             $70,000)
    19970S0186B0179                 - 77 -

     1             (Design and Contingencies - $15,000)
     2         (40)  SR 0422, Route 422 Overpass,
     3             Muddycreek Township, Bridge
     4             Replacement                                 1,450,000
     5             (Base Construction Allocation -
     6             $1,000,000)
     7             (Land Allocation - $100,000)
     8             (Design and Contingencies - $350,000)
     9         (41)  SR 0008, B&LE Railroad Overpass,
    10             Mercer Township, Bridge Replacement         1,450,000
    11             (Base Construction Allocation -
    12             $1,000,000)
    13             (Land Allocation - $100,000)
    14             (Design and Contingencies - $350,000)
    15         (42)  SR 0038, B&LE Railroad Overpass,
    16             Concord Township, Bridge Replacement        1,050,000
    17             (Base Construction Allocation -
    18             $750,000)
    19             (Land Allocation - $50,000)
    20             (Design and Contingencies - $250,000)
    21         (43)  SR 2002, Conrail Railroad Overpass,
    22             Summit Township, Bridge Replacement         1,050,000
    23             (Base Construction Allocation -
    24             $750,000)
    25             (Land Allocation - $50,000)
    26             (Design and Contingencies - $250,000)
    27         (44)  SR 2012, B&LE Railroad Overpass,
    28             Jefferson Township, Bridge Replacement      1,050,000
    29             (Base Construction Allocation -
    30             $750,000)
    19970S0186B0179                 - 78 -

     1             (Land Allocation - $50,000)
     2             (Design and Contingencies - $250,000)
     3         (45)  SR 3004, B&LE Railroad Overpass,
     4             Butler Township, Bridge Replacement           595,000
     5             (Base Construction Allocation -
     6             $400,000)
     7             (Land Allocation - $20,000)
     8             (Design and Contingencies - $175,000)
     9         (46)  SR 0008, Bridge over Armco Private
    10             Drive, Butler Township, Bridge
    11             Replacement                                 1,450,000
    12             (Base Construction Allocation -
    13             $1,000,000)
    14             (Land Allocation - $100,000)
    15             (Design and Contingencies - $350,000)
    16         (47)  SR 0019, Scholars Run Bridge, Jackson
    17             Township, Bridge Replacement                1,050,000
    18             (Base Construction Allocation -
    19             $750,000)
    20             (Land Allocation - $50,000)
    21             (Design and Contingencies - $250,000)
    22         (48)  SR 0019, SR 0019 over SR 0422,
    23             Muddycreek Township, Bridge
    24             Replacement                                 1,050,000
    25             (Base Construction Allocation -
    26             $750,000)
    27             (Land Allocation - $50,000)
    28             (Design and Contingencies - $250,000)
    29         (49)  SR 0058, McMurray Run Bridge, Marion
    30             Township, Bridge Replacement                1,050,000
    19970S0186B0179                 - 79 -

     1             (Base Construction Allocation -
     2             $750,000)
     3             (Land Allocation - $50,000)
     4             (Design and Contingencies - $250,000)
     5         (50)  SR 0068, Sullivan Run Bridge, Butler
     6             Township, Bridge Replacement                1,450,000
     7             (Base Construction Allocation -
     8             $1,000,000)
     9             (Land Allocation - $100,000)
    10             (Design and Contingencies - $350,000)
    11         (51)  SR 0080, I-80 over TR 540, Allegheny
    12             Township, Bridge Replacement                1,450,000
    13             (Base Construction Allocation -
    14             $1,000,000)
    15             (Land Allocation - $100,000)
    16             (Design and Contingencies - $350,000)
    17         (52)  SR 0138, Muddy Creek Bridge, Clay
    18             Township, Bridge Replacement                  595,000
    19             (Base Construction Allocation -
    20             $400,000)
    21             (Land Allocation - $20,000)
    22             (Design and Contingencies - $175,000)
    23         (53)  SR 0173, Slippery Rock Creek Bridge,
    24             Slippery Rock Township, Bridge
    25             Replacement                                 1,050,000
    26             (Base Construction Allocation -
    27             $750,000)
    28             (Land Allocation - $50,000)
    29             (Design and Contingencies - $250,000)
    30         (54)  SR 0079, I-79 North Bridge over Ramp,
    19970S0186B0179                 - 80 -

     1             Jackson Township, Bridge Replacement        1,450,000
     2             (Base Construction Allocation -
     3             $1,000,000)
     4             (Land Allocation - $100,000)
     5             (Design and Contingencies - $350,000)
     6         (55)  SR 0079, I-79 South Bridge over Ramp,
     7             Jackson Township, Bridge Replacement        1,450,000
     8             (Base Construction Allocation -
     9             $1,000,000)
    10             (Land Allocation - $100,000)
    11             (Design and Contingencies - $350,000)
    12         (56)  SR 0079, I-79 over SR 0068, Jackson
    13             Township, Bridge Replacement                1,450,000
    14             (Base Construction Allocation -
    15             $1,000,000)
    16             (Land Allocation - $100,000)
    17             (Design and Contingencies - $350,000)
    18         (57)  SR 0079, I-79 over TR 347, Lancaster
    19             Township, Bridge Replacement                1,450,000
    20             (Base Construction Allocation -
    21             $1,000,000)
    22             (Land Allocation - $100,000)
    23             (Design and Contingencies - $350,000)
    24         (58)  SR 0079, I-79 North Bridge over SR
    25             0422, Worth Township, Bridge
    26             Replacement                                 1,450,000
    27             (Base Construction Allocation -
    28             $1,000,000)
    29             (Land Allocation - $100,000)
    30             (Design and Contingencies - $350,000)
    19970S0186B0179                 - 81 -

     1         (59)  SR 0079, I-79 South Bridge over SR
     2             0422, Worth Township, Bridge
     3             Replacement                                 1,450,000
     4             (Base Construction Allocation -
     5             $1,000,000)
     6             (Land Allocation - $100,000)
     7             (Design and Contingencies - $350,000)
     8         (60)  SR 0422, SR 0422 over SR 4005,
     9             Muddycreek Township, Bridge
    10             Replacement                                 1,450,000
    11             (Base Construction Allocation -
    12             $1,000,000)
    13             (Land Allocation - $100,000)
    14             (Design and Contingencies - $350,000)
    15         (61)  SR 0528, SR 0528 over SR 0422,
    16             Franklin Township, Bridge Replacement       1,050,000
    17             (Base Construction Allocation -
    18             $750,000)
    19             (Land Allocation - $50,000)
    20             (Design and Contingencies - $250,000)
    21         (62)  SR 1010, Bear Creek Bridge, Fairview
    22             Township, Bridge Replacement                1,050,000
    23             (Base Construction Allocation -
    24             $750,000)
    25             (Land Allocation - $50,000)
    26             (Design and Contingencies - $250,000)
    27         (63)  SR 1014, Bonnie Brook Bridge over
    28             Bonnie Brook, Summit Township, Bridge
    29             Replacement                                   595,000
    30             (Base Construction Allocation -
    19970S0186B0179                 - 82 -

     1             $400,000)
     2             (Land Allocation - $20,000)
     3             (Design and Contingencies - $175,000)
     4         (64)  SR 1016, Connoquenessing Creek
     5             Bridge, Summit Township, Bridge
     6             Replacement                                   595,000
     7             (Base Construction Allocation -
     8             $400,000)
     9             (Land Allocation - $20,000)
    10             (Design and Contingencies - $175,000)
    11         (65)  SR 2006, SR 2006 over SR 0422, Summit
    12             Township, Bridge Replacement                1,050,000
    13             (Base Construction Allocation -
    14             $750,000)
    15             (Land Allocation - $50,000)
    16             (Design and Contingencies - $250,000)
    17         (66)  SR 2010, Bridge over Branch of Thorn
    18             Creek, Jefferson Township, Bridge
    19             Replacement                                 1,050,000
    20             (Base Construction Allocation -
    21             $750,000)
    22             (Land Allocation - $50,000)
    23             (Design and Contingencies - $250,000)
    24         (67)  SR 2010, Little Buffalo Creek Bridge,
    25             Winfield Township, Bridge Replacement       1,050,000
    26             (Base Construction Allocation -
    27             $750,000)
    28             (Land Allocation - $50,000)
    29             (Design and Contingencies - $250,000)
    30         (68)  SR 2011, Bridge over Branch of Bull
    19970S0186B0179                 - 83 -

     1             Creek, Clinton Township, Bridge
     2             Replacement                                   595,000
     3             (Base Construction Allocation -
     4             $400,000)
     5             (Land Allocation - $20,000)
     6             (Design and Contingencies - $175,000)
     7         (69)  SR 2011, Little Bull Run Bridge No.4
     8             over Bull Run, Clinton Township, Bridge
     9             Replacement                                   595,000
    10             (Base Construction Allocation -
    11             $400,000)
    12             (Land Allocation - $20,000)
    13             (Design and Contingencies - $175,000)
    14         (70)  SR 2018, Bridge No.1 over Branch of
    15             Buffalo Creek, Winfield Township,
    16             Bridge Replacement                          1,050,000
    17             (Base Construction Allocation -
    18             $750,000)
    19             (Land Allocation - $50,000)
    20             (Design and Contingencies - $250,000)
    21         (71)  SR 2018, Bridge No.2 over Branch of
    22             Buffalo Creek, Winfield Township,
    23             Bridge Replacement                          1,050,000
    24             (Base Construction Allocation -
    25             $750,000)
    26             (Land Allocation - $50,000)
    27             (Design and Contingencies - $250,000)
    28         (72)  SR 3025, Little Connoquenessing Creek
    29             Bridge, Lancaster Township, Bridge
    30             Replacement                                   595,000
    19970S0186B0179                 - 84 -

     1             (Base Construction Allocation -
     2             $400,000)
     3             (Land Allocation - $20,000)
     4             (Design and Contingencies - $175,000)
     5         (73)  SR 4007, SR 4007 over SR 0422, Worth
     6             Township, Bridge Replacement                1,050,000
     7             (Base Construction Allocation -
     8             $750,000)
     9             (Land Allocation - $50,000)
    10             (Design and Contingencies - $250,000)
    11         (74)  SR 4007, Park Road Bridge, Worth
    12             Township, Bridge Replacement                1,050,000
    13             (Base Construction Allocation -
    14             $750,000)
    15             (Land Allocation - $50,000)
    16             (Design and Contingencies - $250,000)
    17         (75)  SR 4010, Long Run Bridge, Slippery
    18             Rock Township, Bridge Replacement             595,000
    19             (Base Construction Allocation -
    20             $400,000)
    21             (Land Allocation - $20,000)
    22             (Design and Contingencies - $175,000)
    23         (76)  SR 8005, SR 8005 over SR 0019,
    24             Jackson Township, Bridge Replacement          595,000
    25             (Base Construction Allocation -
    26             $400,000)
    27             (Land Allocation - $20,000)
    28             (Design and Contingencies - $175,000)
    29         (77)  SR 0008, William Flynn Bridge,
    30             Middlesex Township, Bridge Replacement      1,450,000
    19970S0186B0179                 - 85 -

     1             (Base Construction Allocation -
     2             $1,000,000)
     3             (Land Allocation - $100,000)
     4             (Design and Contingencies - $350,000)
     5         (78)  SR 0008, Glade Run Bridge, Middlesex
     6             Township, Bridge Rehabilitation             1,450,000
     7             (Base Construction Allocation -
     8             $1,000,000)
     9             (Land Allocation - $100,000)
    10             (Design and Contingencies - $350,000)
    11         (79)  SR 0008, Little Glade Run Bridge
    12             No.1, Middlesex Township, Bridge
    13             Rehabilitation                              1,450,000
    14             (Base Construction Allocation -
    15             $1,000,000)
    16             (Land Allocation - $100,000)
    17             (Design and Contingencies - $350,000)
    18         (80)  SR 0008, Little Glade Run Bridge
    19             No.2, Middlesex Township, Bridge
    20             Rehabilitation                              1,450,000
    21             (Base Construction Allocation -
    22             $1,000,000)
    23             (Land Allocation - $100,000)
    24             (Design and Contingencies - $350,000)
    25         (81)  SR 0008, Glade Run Bridge No.2,
    26             Middlesex Township, Bridge
    27             Rehabilitation                              1,450,000
    28             (Base Construction Allocation -
    29             $1,000,000)
    30             (Land Allocation - $100,000)
    19970S0186B0179                 - 86 -

     1             (Design and Contingencies - $350,000)
     2         (82)  SR 0008, Bulcher Run Bridge, Butler
     3             Township, Bridge Rehabilitation             1,450,000
     4             (Base Construction Allocation -
     5             $1,000,000)
     6             (Land Allocation - $100,000)
     7             (Design and Contingencies - $350,000)
     8         (83)  SR 0008, Bridge No.2 over Branch of
     9             Muddy Creek, Clay Township, Bridge
    10             Rehabilitation                              1,450,000
    11             (Base Construction Allocation -
    12             $1,000,000)
    13             (Land Allocation - $100,000)
    14             (Design and Contingencies - $350,000)
    15         (84)  SR 0008, Muddy Creek Bridge, Clay
    16             Township, Bridge Rehabilitation             1,450,000
    17             (Base Construction Allocation -
    18             $1,000,000)
    19             (Land Allocation - $100,000)
    20             (Design and Contingencies - $350,000)
    21         (85)  SR 0008, Glade Run Bridge No.3, Brady
    22             Township, Bridge Rehabilitation             1,450,000
    23             (Base Construction Allocation -
    24             $1,000,000)
    25             (Land Allocation - $100,000)
    26             (Design and Contingencies - $350,000)
    27         (86)  SR 0008, McDonalds Run Bridge, Mercer
    28             Township, Bridge Replacement                1,450,000
    29             (Base Construction Allocation -
    30             $1,000,000)
    19970S0186B0179                 - 87 -

     1             (Land Allocation - $100,000)
     2             (Design and Contingencies - $350,000)
     3         (87)  SR 0008, McMurry Run Bridge, Mercer
     4             Township, Bridge Rehabilitation             1,450,000
     5             (Base Construction Allocation -
     6             $1,000,000)
     7             (Land Allocation - $100,000)
     8             (Design and Contingencies - $350,000)
     9         (88)  SR 0019, Glade Run Bridge No.2,
    10             Jackson Township, Bridge
    11             Rehabilitation                              1,050,000
    12             (Base Construction Allocation -
    13             $750,000)
    14             (Land Allocation - $50,000)
    15             (Design and Contingencies - $250,000)
    16         (89)  SR 0019, Glade Run Bridge No.2,
    17             Jackson Township, Bridge
    18             Rehabilitation                              1,050,000
    19             (Base Construction Allocation -
    20             $750,000)
    21             (Land Allocation - $50,000)
    22             (Design and Contingencies - $250,000)
    23         (90)  SR 0038, Connoquenessing Creek
    24             Bridge, Center Township, Bridge
    25             Rehabilitation                              1,050,000
    26             (Base Construction Allocation -
    27             $750,000)
    28             (Land Allocation - $50,000)
    29             (Design and Contingencies - $250,000)
    30         (91)  SR 0038, Pine Run Bridge, Oakland
    19970S0186B0179                 - 88 -

     1             Township, Bridge Rehabilitation             1,050,000
     2             (Base Construction Allocation -
     3             $750,000)
     4             (Land Allocation - $50,000)
     5             (Design and Contingencies - $250,000)
     6         (92)  SR 0038, Concord Bridge, Concord
     7             Township, Bridge Rehabilitation             1,050,000
     8             (Base Construction Allocation -
     9             $750,000)
    10             (Land Allocation - $50,000)
    11             (Design and Contingencies - $250,000)
    12         (93)  SR 0038, Little Connoquenessing Creek
    13             Bridge No.1, Concord Township, Bridge
    14             Rehabilitation                              1,050,000
    15             (Base Construction Allocation -
    16             $750,000)
    17             (Land Allocation - $50,000)
    18             (Design and Contingencies - $250,000)
    19         (94)  SR 0038, Little Connoquenessing Creek
    20             Bridge, Concord Township, Bridge
    21             Rehabilitation                              1,050,000
    22             (Base Construction Allocation -
    23             $750,000)
    24             (Land Allocation - $50,000)
    25             (Design and Contingencies - $250,000)
    26         (95)  SR 0038, Little Scrubgrass Creek
    27             Bridge, Allegheny Township, Bridge
    28             Rehabilitation                              1,050,000
    29             (Base Construction Allocation -
    30             $750,000)
    19970S0186B0179                 - 89 -

     1             (Land Allocation - $50,000)
     2             (Design and Contingencies - $250,000)
     3         (96)  SR 0038, Bridge over Tributary of
     4             Scrubgrass Creek, Allegheny Township,
     5             Bridge Rehabilitation                       1,050,000
     6             (Base Construction Allocation -
     7             $750,000)
     8             (Land Allocation - $50,000)
     9             (Design and Contingencies - $250,000)
    10         (97)  SR 0058, Murrin Run Bridge, Venango
    11             Township, Bridge Rehabilitation             1,050,000
    12             (Base Construction Allocation -
    13             $750,000)
    14             (Land Allocation - $50,000)
    15             (Design and Contingencies - $250,000)
    16         (98)  SR 0068, B&LE Railroad Bridge, Summit
    17             and Butler Townships, Bridge
    18             Rehabilitation                              1,450,000
    19             (Base Construction Allocation -
    20             $1,000,000)
    21             (Land Allocation - $100,000)
    22             (Design and Contingencies - $350,000)
    23         (99)  SR 0068, Connoquenessing Creek
    24             Bridge, Summit Township, Bridge
    25             Rehabilitation                              1,050,000
    26             (Base Construction Allocation -
    27             $750,000)
    28             (Land Allocation - $50,000)
    29             (Design and Contingencies - $250,000)
    30         (100)  SR 0068, Buffalo Creek Bridge,
    19970S0186B0179                 - 90 -

     1             Chicora Township, Bridge
     2             Rehabilitation                              1,050,000
     3             (Base Construction Allocation -
     4             $750,000)
     5             (Land Allocation - $50,000)
     6             (Design and Contingencies - $250,000)
     7         (101)  SR 0068, Buffalo Run Bridge,
     8             Fairview Township, Bridge
     9             Rehabilitation                              1,050,000
    10             (Base Construction Allocation -
    11             $750,000)
    12             (Land Allocation - $50,000)
    13             (Design and Contingencies - $250,000)
    14         (102)  SR 0079, Bridge over Tributary of
    15             Glade Run, Jackson Township, Bridge
    16             Rehabilitation                              1,450,000
    17             (Base Construction Allocation -
    18             $1,000,000)
    19             (Land Allocation - $100,000)
    20             (Design and Contingencies - $350,000)
    21         (103)  SR 0079, Bridge No.1 over Branch of
    22             Yellow Creek, Lancaster Township,
    23             Bridge Rehabilitation                       1,450,000
    24             (Base Construction Allocation -
    25             $1,000,000)
    26             (Land Allocation - $100,000)
    27             (Design and Contingencies - $350,000)
    28         (104)  SR 0079, Bridge No.2 over Branch of
    29             Yellow Creek, Lancaster Township,
    30             Bridge Rehabilitation                       1,450,000
    19970S0186B0179                 - 91 -

     1             (Base Construction Allocation -
     2             $1,000,000)
     3             (Land Allocation - $100,000)
     4             (Design and Contingencies - $350,000)
     5         (105)  SR 0079, Bridge No.3 over Branch of
     6             Yellow Creek, Lancaster Township,
     7             Bridge Rehabilitation                       1,450,000
     8             (Base Construction Allocation -
     9             $1,000,000)
    10             (Land Allocation - $100,000)
    11             (Design and Contingencies - $350,000)
    12         (106)  SR 0079, Little Yellow Creek Bridge,
    13             Lancaster Township, Bridge
    14             Rehabilitation                              1,450,000
    15             (Base Construction Allocation -
    16             $1,000,000)
    17             (Land Allocation - $100,000)
    18             (Design and Contingencies - $350,000)
    19         (107)  SR 0079, Bridge No.4 over Branch of
    20             Yellow Creek, Muddycreek Township,
    21             Bridge Rehabilitation                       1,450,000
    22             (Base Construction Allocation -
    23             $1,000,000)
    24             (Land Allocation - $100,000)
    25             (Design and Contingencies - $350,000)
    26         (108)  SR 0079, Bridge at Milepost 100,
    27             Worth Township, Bridge Rehabilitation       1,450,000
    28             (Base Construction Allocation -
    29             $1,000,000)
    30             (Land Allocation - $100,000)
    19970S0186B0179                 - 92 -

     1             (Design and Contingencies - $350,000)
     2         (109)  SR 0079, Black Run Bridge, Worth
     3             Township, Bridge Rehabilitation             1,450,000
     4             (Base Construction Allocation -
     5             $1,000,000)
     6             (Land Allocation - $100,000)
     7             (Design and Contingencies - $350,000)
     8         (110)  SR 0268, Bridge over Branch of Bear
     9             Creek, Petrolia Borough, Bridge
    10             Rehabilitation                              1,050,000
    11             (Base Construction Allocation -
    12             $750,000)
    13             (Land Allocation - $50,000)
    14             (Design and Contingencies - $250,000)
    15         (111)  SR 0268, Lowrey Run Bridge,
    16             Allegheny Township, Bridge
    17             Rehabilitation                              1,050,000
    18             (Base Construction Allocation -
    19             $750,000)
    20             (Land Allocation - $50,000)
    21             (Design and Contingencies - $250,000)
    22         (112)  SR 0308, B&LE Railroad Bridge,
    23             Center Township, Bridge Rehabilitation      1,050,000
    24             (Base Construction Allocation -
    25             $750,000)
    26             (Land Allocation - $50,000)
    27             (Design and Contingencies - $250,000)
    28         (113)  SR 0308, Stony Run Bridge, Center
    29             Township, Bridge Rehabilitation             1,050,000
    30             (Base Construction Allocation -
    19970S0186B0179                 - 93 -

     1             $750,000)
     2             (Land Allocation - $50,000)
     3             (Design and Contingencies - $250,000)
     4         (114)  SR 0356, Little Buffalo Creek
     5             Bridge, Buffalo Township, Bridge
     6             Rehabilitation                              1,050,000
     7             (Base Construction Allocation -
     8             $750,000)
     9             (Land Allocation - $50,000)
    10             (Design and Contingencies - $250,000)
    11         (115)  SR 0356, Big Coal Run Bridge, Summit
    12             Township, Bridge Rehabilitation             1,050,000
    13             (Base Construction Allocation -
    14             $750,000)
    15             (Land Allocation - $50,000)
    16             (Design and Contingencies - $250,000)
    17         (116)  SR 0422, Lake Arthur Bridge,
    18             Franklin Township, Bridge
    19             Rehabilitation                              1,450,000
    20             (Base Construction Allocation -
    21             $1,000,000)
    22             (Land Allocation - $100,000)
    23             (Design and Contingencies - $350,000)
    24         (117)  SR 0422, Big Run Bridge, Franklin
    25             Township, Bridge Rehabilitation             1,450,000
    26             (Base Construction Allocation -
    27             $1,000,000)
    28             (Land Allocation - $100,000)
    29             (Design and Contingencies - $350,000)
    30         (118)  SR 0422, Mulligan Run Bridge,
    19970S0186B0179                 - 94 -

     1             Franklin Township, Bridge
     2             Rehabilitation                              1,450,000
     3             (Base Construction Allocation -
     4             $1,000,000)
     5             (Land Allocation - $100,000)
     6             (Design and Contingencies - $350,000)
     7         (119)  SR 0422, Big Mulligan Run Bridge,
     8             Franklin Township, Bridge
     9             Rehabilitation                              1,450,000
    10             (Base Construction Allocation -
    11             $1,000,000)
    12             (Land Allocation - $100,000)
    13             (Design and Contingencies - $350,000)
    14         (120)  SR 0422, Big Sullivan Run Bridge,
    15             Butler Township, Bridge Rehabilitation      1,450,000
    16             (Base Construction Allocation -
    17             $1,000,000)
    18             (Land Allocation - $100,000)
    19             (Design and Contingencies - $350,000)
    20         (121)  SR 0422, Connoquenessing Creek
    21             Bridge, Butler Township, Bridge
    22             Rehabilitation                              1,450,000
    23             (Base Construction Allocation -
    24             $1,000,000)
    25             (Land Allocation - $100,000)
    26             (Design and Contingencies - $350,000)
    27         (122)  SR 0422, Bridge No.1 over Tributary
    28             of Connoquenessing Creek, Summit
    29             Township, Bridge Rehabilitation             1,450,000
    30             (Base Construction Allocation -
    19970S0186B0179                 - 95 -

     1             $1,000,000)
     2             (Land Allocation - $100,000)
     3             (Design and Contingencies - $350,000)
     4         (123)  SR 0422, Bridge No.2 over Tributary
     5             of Bonnie Brook, Butler Township,
     6             Bridge Rehabilitation                       1,450,000
     7             (Base Construction Allocation -
     8             $1,000,000)
     9             (Land Allocation - $100,000)
    10             (Design and Contingencies - $350,000)
    11         (124)  SR 0422, Bonnie Brook Bridge No.1,
    12             Summit Township, Bridge Rehabilitation      1,450,000
    13             (Base Construction Allocation -
    14             $1,000,000)
    15             (Land Allocation - $100,000)
    16             (Design and Contingencies - $350,000)
    17         (125)  SR 0422, Bridge No.3 over Tributary
    18             of Bonnie Brook, Summit Township,
    19             Bridge Rehabilitation                       1,450,000
    20             (Base Construction Allocation -
    21             $1,000,000)
    22             (Land Allocation - $100,000)
    23             (Design and Contingencies - $350,000)
    24         (126)  SR 0422, Bonnie Brook Bridge No.2,
    25             Summit Township, Bridge Rehabilitation      1,450,000
    26             (Base Construction Allocation -
    27             $1,000,000)
    28             (Land Allocation - $100,000)
    29             (Design and Contingencies - $350,000)
    30         (127)  SR 0422, Bridge No.4 over Tributary
    19970S0186B0179                 - 96 -

     1             of Bonnie Brook, Summit Township,
     2             Bridge Rehabilitation                       1,450,000
     3             (Base Construction Allocation -
     4             $1,000,000)
     5             (Land Allocation - $100,000)
     6             (Design and Contingencies - $350,000)
     7         (128)  SR 0422, Little Buffalo Creek
     8             Bridge, Clearfield Township, Bridge
     9             Rehabilitation                              1,450,000
    10             (Base Construction Allocation -
    11             $1,000,000)
    12             (Land Allocation - $100,000)
    13             (Design and Contingencies - $350,000)
    14         (129)  SR 0422, Buffalo Creek Bridge,
    15             Clearfield Township, Bridge
    16             Rehabilitation                              1,450,000
    17             (Base Construction Allocation -
    18             $1,000,000)
    19             (Land Allocation - $100,000)
    20             (Design and Contingencies - $350,000)
    21         (130)  SR 0528, Likens Run Bridge, Evans
    22             City Borough, Bridge Rehabilitation         1,050,000
    23             (Base Construction Allocation -
    24             $750,000)
    25             (Land Allocation - $50,000)
    26             (Design and Contingencies - $250,000)
    27         (131)  SR 1010, Glade Run Bridge, Brady
    28             Township, Bridge Rehabilitation               595,000
    29             (Base Construction Allocation -
    30             $400,000)
    19970S0186B0179                 - 97 -

     1             (Land Allocation - $20,000)
     2             (Design and Contingencies - $175,000)
     3         (132)  SR 1010, Big Bear Creek Bridge,
     4             Fairview Township, Bridge
     5             Rehabilitation                                595,000
     6             (Base Construction Allocation -
     7             $400,000)
     8             (Land Allocation - $20,000)
     9             (Design and Contingencies - $175,000)
    10         (133)  SR 1011, Buffalo Creek Bridge,
    11             Fairview Township, Bridge
    12             Rehabilitation                                595,000
    13             (Base Construction Allocation -
    14             $400,000)
    15             (Land Allocation - $20,000)
    16             (Design and Contingencies - $175,000)
    17         (134)  SR 1019, Big Buffalo Run Bridge,
    18             Donegal Township, Bridge
    19             Rehabilitation                              1,050,000
    20             (Base Construction Allocation -
    21             $750,000)
    22             (Land Allocation - $50,000)
    23             (Design and Contingencies - $250,000)
    24         (135)  SR 1025, Bonnie Brook Bridge, Summit
    25             Township, Bridge Rehabilitation             1,050,000
    26             (Base Construction Allocation -
    27             $750,000)
    28             (Land Allocation - $50,000)
    29             (Design and Contingencies - $250,000)
    30         (136)  SR 2002, Coal Run Bridge, City of
    19970S0186B0179                 - 98 -

     1             Butler and Butler Township, Bridge
     2             Rehabilitation                              1,050,000
     3             (Base Construction Allocation -
     4             $750,000)
     5             (Land Allocation - $50,000)
     6             (Design and Contingencies - $250,000)
     7         (137)  SR 2004, Bonnie Brook Bridge, Summit
     8             Township, Bridge Rehabilitation             1,050,000
     9             (Base Construction Allocation -
    10             $750,000)
    11             (Land Allocation - $50,000)
    12             (Design and Contingencies - $250,000)
    13         (138)  SR 2012, Thorn Creek Bridge No.1,
    14             Jefferson Township, Bridge
    15             Rehabilitation                              1,050,000
    16             (Base Construction Allocation -
    17             $750,000)
    18             (Land Allocation - $50,000)
    19             (Design and Contingencies - $250,000)
    20         (139)  SR 2012, Thorn Creek Bridge No.2,
    21             Jefferson Township, Bridge
    22             Rehabilitation                              1,050,000
    23             (Base Construction Allocation -
    24             $750,000)
    25             (Land Allocation - $50,000)
    26             (Design and Contingencies - $250,000)
    27         (140)  SR 3001, West Butler Creek Bridge,
    28             Butler Township, Bridge Rehabilitation      1,450,000
    29             (Base Construction Allocation -
    30             $1,000,000)
    19970S0186B0179                 - 99 -

     1             (Land Allocation - $100,000)
     2             (Design and Contingencies - $350,000)
     3         (141)  SR 3007, Thorn Creek Bridge, Butler
     4             Township, Bridge Rehabilitation             1,050,000
     5             (Base Construction Allocation -
     6             $750,000)
     7             (Land Allocation - $50,000)
     8             (Design and Contingencies - $250,000)
     9         (142)  SR 3009, Cranberry Run Bridge, Penn
    10             Township, Bridge Rehabilitation               595,000
    11             (Base Construction Allocation -
    12             $400,000)
    13             (Land Allocation - $20,000)
    14             (Design and Contingencies - $175,000)
    15         (143)  SR 3010, Saw Mill Run Bridge, Penn
    16             Township, Bridge Rehabilitation               595,000
    17             (Base Construction Allocation -
    18             $400,000)
    19             (Land Allocation - $20,000)
    20             (Design and Contingencies - $175,000)
    21         (144)  SR 3015, Bridge No.2 over Tributary
    22             of Wolf Run, Forward Township, Bridge
    23             Rehabilitation                              1,050,000
    24             (Base Construction Allocation -
    25             $750,000)
    26             (Land Allocation - $50,000)
    27             (Design and Contingencies - $250,000)
    28         (145)  SR 3015, Bridge No.3 over Tributary
    29             of Wolf Run, Forward Township, Bridge
    30             Rehabilitation                              1,050,000
    19970S0186B0179                 - 100 -

     1             (Base Construction Allocation -
     2             $750,000)
     3             (Land Allocation - $50,000)
     4             (Design and Contingencies - $250,000)
     5         (146)  SR 3025, Bridge over Branch of
     6             Yellow Creek, Lancaster Township,
     7             Bridge Rehabilitation                         595,000
     8             (Base Construction Allocation -
     9             $400,000)
    10             (Land Allocation - $20,000)
    11             (Design and Contingencies - $175,000)
    12         (147)  SR 3031, SR 3031 over US 422, Butler
    13             Township, Bridge Rehabilitation               595,000
    14             (Base Construction Allocation -
    15             $400,000)
    16             (Land Allocation - $20,000)
    17             (Design and Contingencies - $175,000)
    18         (148)  SR 3034, Bridge over Branch of
    19             Semiconon, Prospect Borough, Bridge
    20             Rehabilitation                                595,000
    21             (Base Construction Allocation -
    22             $400,000)
    23             (Land Allocation - $20,000)
    24             (Design and Contingencies - $175,000)
    25         (149)  SR 4001, SR 4001 over US 422, Butler
    26             Township, Bridge Rehabilitation             1,050,000
    27             (Base Construction Allocation -
    28             $750,000)
    29             (Land Allocation - $50,000)
    30             (Design and Contingencies - $250,000)
    19970S0186B0179                 - 101 -

     1         (150)  SR 4002, Bridge over Branch of Muddy
     2             Creek, Clay Township, Bridge
     3             Rehabilitation                              1,050,000
     4             (Base Construction Allocation -
     5             $750,000)
     6             (Land Allocation - $50,000)
     7             (Design and Contingencies - $250,000)
     8         (151)  T-716, Old Plank Road Bridge, Penn
     9             Township, Bridge Replacement                  390,000
    10             (Base Construction Allocation -
    11             $300,000)
    12             (Land Allocation - $10,000)
    13             (Design and Contingencies - $80,000)
    14         (152)  SR 3007, Crooked Run Bridge, Center
    15             Township, Bridge Replacement                1,050,000
    16             (Base Construction Allocation -
    17             $750,000)
    18             (Land Allocation - $50,000)
    19             (Design and Contingencies - $250,000)
    20         (153)  SR 3010, Glade Run Bridge, Forward
    21             Township, Bridge Replacement                  595,000
    22             (Base Construction Allocation -
    23             $400,000)
    24             (Land Allocation - $20,000)
    25             (Design and Contingencies - $175,000)
    26         (154)  SR 3013, Big Connoquessing Bridge,
    27             Forward Township, Bridge Replacement          595,000
    28             (Base Construction Allocation -
    29             $400,000)
    30             (Land Allocation - $20,000)
    19970S0186B0179                 - 102 -

     1             (Design and Contingencies - $175,000)
     2         (155)  SR 0019, SR 0019 over Brush Creek,
     3             Cranberry Township, Bridge Replacement      1,050,000
     4             (Base Construction Allocation -
     5             $800,000)
     6             (Land Allocation - $75,000)
     7             (Design and Contingencies - $175,000)
     8         (156)  SR 0079, SR 0079 over Big Brush
     9             Creek, Cranberry Township, Bridge
    10             Replacement                                 1,450,000
    11             (Base Construction Allocation -
    12             $1,100,000)
    13             (Land Allocation - $75,000)
    14             (Design and Contingencies - $275,000)
    15         (157)  SR 0079, SR 0079 over Coal Run,
    16             Cranberry Township, Bridge Replacement      1,450,000
    17             (Base Construction Allocation -
    18             $1,100,000)
    19             (Land Allocation - $75,000)
    20             (Design and Contingencies - $275,000)
    21         (158)  SR 0228, SR 0228 over CSX Railroad,
    22             Adams Township, Bridge Replacement          1,450,000
    23             (Base Construction Allocation -
    24             $1,100,000)
    25             (Land Allocation - $75,000)
    26             (Design and Contingencies - $275,000)
    27         (159)  SR 3015, Breakneck Bridge, Adams
    28             Township, Bridge Replacement                  595,000
    29             (Base Construction Allocation -
    30             $400,000)
    19970S0186B0179                 - 103 -

     1             (Land Allocation - $20,000)
     2             (Design and Contingencies - $175,000)
     3         (160)  SR 3022, SR 3022 over Brush Creek,
     4             Cranberry Township, Bridge Replacement      1,050,000
     5             (Base Construction Allocation -
     6             $800,000)
     7             (Land Allocation - $75,000)
     8             (Design and Contingencies - $175,000)
     9         (161)  SR 3024, SR 3024 over Big Brush
    10             Creek, Cranberry Township, Bridge
    11             Replacement                                   595,000
    12             (Base Construction Allocation -
    13             $400,000)
    14             (Land Allocation - $20,000)
    15             (Design and Contingencies - $175,000)
    16  Section 15.  Cambria County
    17     (a)  Local Bridges
    18         (1)  Summerhill Township, T-346, Bridge
    19             No.1, Howard Avenue over Beaverdam Run,
    20             Bridge Replacement                            450,000
    21             (Base Construction Allocation -
    22             $350,000)
    23             (Design and Contingencies - $100,000)
    24         (2)  West Carroll Township, T-505 over
    25             Blacklick Creek, Bridge Replacement           235,000
    26             (Base Construction Allocation -
    27             $200,000)
    28             (Land Allocation - $10,000)
    29             (Design and Contingencies - $25,000)
    30         (3)  West Carroll Township, T-626 over Fox
    19970S0186B0179                 - 104 -

     1             Run, Bridge Replacement                       235,000
     2             (Base Construction Allocation -
     3             $200,000)
     4             (Land Allocation - $10,000)
     5             (Design and Contingencies - $25,000)
     6     (b)  State Bridges
     7         (1)  SR 1030, Carl Road over Slate Lick
     8             Creek, Clearfield Township, Bridge
     9             Replacement                                   240,000
    10             (Base Construction Allocation -
    11             $200,000)
    12             (Land Allocation - $10,000)
    13             (Design and Contingencies - $30,000)
    14  Section 16.  (Reserved).
    15  Section 17.  Carbon County.
    16     (a)  Local Bridges
    17         (1)  Penn Forest Township, T-481, County
    18             Bridge No.21 over Panther Creek, Bridge
    19             Replacement                                   290,000
    20             (Base Construction Allocation -
    21             $180,000)
    22             (Land Allocation - $10,000)
    23             (Design and Contingencies - $100,000)
    24     (b)  State Bridges
    25         (1)  SR 2002, Delaware Avenue over Palmer
    26             Creek, Palmerton Borough, Bridge
    27             Replacement                                   568,000
    28             (Base Construction Allocation -
    29             $318,000)
    30             (Land Allocation - $150,000)
    19970S0186B0179                 - 105 -

     1             (Design and Contingencies - $100,000)
     2         (2)  SR 4010, SR 4010 over Quakake Creek,
     3             Packer Township, Bridge Replacement           412,000
     4             (Base Construction Allocation -
     5             $202,000)
     6             (Land Allocation - $150,000)
     7             (Design and Contingencies - $60,000)
     8         (3)  SR 0209, SR 0209 Turnpike Ramp,
     9             Mahoning Interchange, Franklin
    10             Township, Bridge Replacement                1,260,000
    11             (Base Construction Allocation -
    12             $750,000)
    13             (Land Allocation - $300,000)
    14             (Design and Contingencies - $210,000)
    15         (4)  SR 0248, SR 0248 over Pohopoco Creek,
    16             Parryville Borough Line, Lower
    17             Towamensing Township, Bridge
    18             Rehabilitation                                415,000
    19             (Base Construction Allocation -
    20             $315,000)
    21             (Design and Contingencies - $100,000)
    22         (5)  SR 4010, SR 4010 over Hartz Creek,
    23             Packer Township, Bridge Replacement           615,000
    24             (Base Construction Allocation -
    25             $370,000)
    26             (Land Allocation - $150,000)
    27             (Design and Contingencies - $95,000)
    28         (6)  SR 0534, SR 0534 over Sand Spring Run,
    29             2 Miles South of Lehigh Tannery, Kidder
    30             Township, Bridge Replacement                  340,000
    19970S0186B0179                 - 106 -

     1             (Base Construction Allocation -
     2             $160,000)
     3             (Land Allocation - $125,000)
     4             (Design and Contingencies - $55,000)
     5         (7)  SR 0209, SR 0209 over Pohopoco Creek,
     6             Village of Harrity, Franklin Township,
     7             Bridge Rehabilitation                         885,000
     8             (Base Construction Allocation -
     9             $680,000)
    10             (Design and Contingencies - $205,000)
    11         (8)  SR 0534, Pa 534 over I-80, Kidder
    12             Township, Bridge Rehabilitation               540,000
    13             (Base Construction Allocation -
    14             $440,000)
    15             (Design and Contingencies - $100,000)
    16  Section 18.  Centre County.
    17     (a)  Local Bridges
    18         (1)  Greene Township, T-350, Stover Road
    19             Bridge, Bridge Replacement                    230,000
    20             (Base Construction Allocation -
    21             $180,000)
    22             (Land Allocation - $10,000)
    23             (Design and Contingencies - $40,000)
    24         (2)  Howard Township, T-398 over Bullit
    25             Run, Bridge Rehabilitation                     11,000
    26             (Base Construction Allocation - $9,000)
    27             (Design and Contingencies - $2,000)
    28         (3)  Halfmoon Township, T-307 over
    29             Loveville Creek, Bridge Replacement            21,000
    30             (Base Construction Allocation -
    19970S0186B0179                 - 107 -

     1             $19,000)
     2             (Design and Contingencies - $2,000)
     3         (4)  Penn Township, T-839 over Pine Creek,
     4             Bridge Rehabilitation                          80,000
     5             (Base Construction Allocation -
     6             $60,000)
     7             (Design and Contingencies - $20,000)
     8         (5)  Port Matilda Borough, Pedestrian
     9             Bridge over Bald Eagle Creek, Bridge
    10             Rehabilitation                                200,000
    11             (Base Construction Allocation -
    12             $175,000)
    13             (Design and Contingencies - $25,000)
    14         (6)  Spring Township, T-367, Hill Road
    15             Bridge, Bridge Replacement                    200,000
    16             (Base Construction Allocation -
    17             $150,000)
    18             (Land Allocation - $10,000)
    19             (Design and Contingencies - $40,000)
    20     (b)  State Bridges
    21         (1)  SR 0080, I-80 Viaduct over Moshannon
    22             Creek and Conrail, Rush Township,
    23             Bridge Rehabilitation                      14,510,000
    24             (Base Construction Allocation -
    25             $13,210,000)
    26             (Design and Contingencies - $1,300,000)
    27         (2)  SR 1002, Marsh Creek Bridge over Marsh
    28             Creek, Boggs Township, Bridge
    29             Replacement                                   760,000
    30             (Base Construction Allocation -
    19970S0186B0179                 - 108 -

     1             $630,000)
     2             (Land Allocation - $20,000)
     3             (Design and Contingencies - $110,000)
     4         (3)  SR 1002, Little Marsh Creek Bridge
     5             over Little Marsh Creek, Curtin
     6             Township, Bridge Replacement                  700,000
     7             (Base Construction Allocation -
     8             $600,000)
     9             (Land Allocation - $20,000)
    10             (Design and Contingencies - $80,000)
    11         (4)  SR 2012, Penns Creek Bridge Northwest
    12             of the Village of Spring Mills, Gregg
    13             Township, Bridge Replacement                  470,000
    14             (Base Construction Allocation -
    15             $360,000)
    16             (Land Allocation - $20,000)
    17             (Design and Contingencies - $90,000)
    18         (5)  SR 0220, SR 0220 over Laurel Run, Port
    19             Matilda Borough, Bridge Rehabilitation        450,000
    20             (Base Construction Allocation -
    21             $400,000)
    22             (Design and Contingencies - $50,000)
    23  Section 19.  Chester County.
    24     (a)  Local Bridges
    25         (1)  Parkesburg Borough, State Street
    26             Pedestrian Bridge over Amtrak, Bridge
    27             Replacement                                 1,700,000
    28             (Base Construction Allocation -
    29             $1,000,000)
    30             (Land Allocation - $500,000)
    19970S0186B0179                 - 109 -

     1             (Design and Contingencies - $200,000)
     2         (2)  East Fallowfield Township, T-362,
     3             Timacuia Road under Penn Central
     4             Railroad, Bridge Removal                      445,000
     5             (Base Construction Allocation -
     6             $400,000)
     7             (Land Allocation - $30,000)
     8             (Design and Contingencies - $15,000)
     9         (3)  East Marlborough Township, T-402,
    10             County Bridge No.65, Mill Road Bridge
    11             over West Branch of Red Clay Creek,
    12             Bridge Replacement                            345,000
    13             (Base Construction Allocation -
    14             $291,000)
    15             (Land Allocation - $25,000)
    16             (Design and Contingencies - $29,000)
    17         (4)  Oxford Borough, Broad Street Bridge
    18             over SEPTA, Bridge Replacement              1,304,000
    19             (Base Construction Allocation -
    20             $1,125,000)
    21             (Land Allocation - $20,000)
    22             (Design and Contingencies - $159,000)
    23         (5)  Penn Township, County Bridge No.260,
    24             Posey Mill Road Bridge over Big Elk
    25             Creek, Bridge Replacement                     425,000
    26             (Base Construction Allocation -
    27             $300,000)
    28             (Land Allocation - $25,000)
    29             (Design and Contingencies - $100,000)
    30         (6)  Tredyffrin Township, Old Lancaster
    19970S0186B0179                 - 110 -

     1             Pike Bridge over Amtrak, Bridge
     2             Rehabilitation                                465,000
     3             (Base Construction Allocation -
     4             $400,000)
     5             (Land Allocation - $30,000)
     6             (Design and Contingencies - $35,000)
     7         (7)  Tredyffrin Township, T-807, Evans Road
     8             Bridge over Conrail, Bridge
     9             Replacement                                   195,000
    10             (Base Construction Allocation -
    11             $150,000)
    12             (Land Allocation - $30,000)
    13             (Design and Contingencies - $15,000)
    14         (8)  West Caln and West Brandywine
    15             Townships, County Bridge No.283, Reid
    16             Road Bridge over West Branch of
    17             Brandywine Creek, Bridge Replacement          740,000
    18             (Base Construction Allocation -
    19             $600,000)
    20             (Land Allocation - $40,000)
    21             (Design and Contingencies - $100,000)
    22         (9)  West Goshen Township, T-210, Old
    23             Eachus Mill Road Bridge over SEPTA,
    24             Bridge Replacement                            615,000
    25             (Base Construction Allocation -
    26             $500,000)
    27             (Land Allocation - $15,000)
    28             (Design and Contingencies - $100,000)
    29         (10)  West Goshen Township, T-328, Bridge
    30             over Penn Central Railroad, Bridge
    19970S0186B0179                 - 111 -

     1             Removal                                       132,000
     2             (Base Construction Allocation -
     3             $110,000)
     4             (Land Allocation - $5,000)
     5             (Design and Contingencies - $17,000)
     6         (11)  West Marlborough Township, T-368,
     7             Creek Road Bridge under Penn Central
     8             Railroad, Bridge Removal                      580,000
     9             (Base Construction Allocation -
    10             $500,000)
    11             (Land Allocation - $5,000)
    12             (Design and Contingencies - $75,000)
    13         (12)  West Marlborough Township, Bridge
    14             over Doe Run, Bridge Replacement              915,000
    15             (Base Construction Allocation -
    16             $750,000)
    17             (Land Allocation - $25,000)
    18             (Design and Contingencies - $140,000)
    19         (13)  East Coventry Township, Zeiber Road
    20             over Pigeon Creek, Bridge Replacement         375,000
    21             (Base Construction Allocation -
    22             $300,000)
    23             (Land Allocation - $15,000)
    24             (Design and Contingencies - $60,000)
    25         (14)  South Coventry Township, Young Road
    26             over Pigeon Creek, Bridge
    27             Rehabilitation                                  6,000
    28             (Base Construction Allocation - $6,000)
    29     (b)  State Bridges
    30         (1)  SR 1010, Swedesford Road Bridge over
    19970S0186B0179                 - 112 -

     1             US 422, Drummers Lane and Warner Road,
     2             Tredyffrin, Chester County, Upper
     3             Merion, Montgomery County, Bridge
     4             Replacement                                 6,795,000
     5             (Base Construction Allocation -
     6             $6,210,000)
     7             (Land Allocation - $180,000)
     8             (Design and Contingencies - $405,000)
     9         (2)  SR 1045, Hares Hill Road Bridge over
    10             French Creek, East Pikeland Township,
    11             Bridge Rehabilitation                       1,000,000
    12             (Base Construction Allocation -
    13             $740,000)
    14             (Land Allocation - $60,000)
    15             (Design and Contingencies - $200,000)
    16         (3)  SR 3014, Lees Road Bridge over Black
    17             Run, West Nottingham Township, Bridge
    18             Replacement                                 1,125,000
    19             (Base Construction Allocation -
    20             $850,000)
    21             (Land Allocation - $75,000)
    22             (Design and Contingencies - $200,000)
    23         (4)  SR 3030, Street Road Bridge over
    24             Octoraro Creek, Upper Oxford Township,
    25             Bridge Replacement                          1,875,000
    26             (Base Construction Allocation -
    27             $1,600,000)
    28             (Land Allocation - $75,000)
    29             (Design and Contingencies - $200,000)
    30         (5)  SR 0003, Gay Street Bridge over
    19970S0186B0179                 - 113 -

     1             Abandoned Conrail, West Chester
     2             Borough, Bridge Removal                       180,000
     3             (Base Construction Allocation -
     4             $150,000)
     5             (Land Allocation - $10,000)
     6             (Design and Contingencies - $20,000)
     7         (6)  SR 0842, Shaws Bridges (Two Bridges)
     8             over Branch of Brandywine Creek, East
     9             Bradford and Pocopson Townships, Bridge
    10             Replacement                                 1,500,000
    11             (Base Construction Allocation -
    12             $1,288,000)
    13             (Land Allocation - $100,000)
    14             (Design and Contingencies - $112,000)
    15         (7)  SR 0842, Bridge Road Bridge over East
    16             Branch of Brandywine Creek, East
    17             Bradford Township, Bridge Painting            214,000
    18             (Base Construction Allocation -
    19             $186,000)
    20             (Design and Contingencies - $28,000)
    21         (8)  SR 1049, Rapp's Dam Covered Bridge,
    22             East Pikeland Township, Bridge
    23             Painting                                       47,000
    24             (Base Construction Allocation -
    25             $41,000)
    26             (Design and Contingencies - $6,000)
    27         (9)  SR 2011, Phoenixville Pike Bridge
    28             under Abandoned Penn Central Railroad,
    29             West Goshen Township, Bridge Removal          125,000
    30             (Base Construction Allocation -
    19970S0186B0179                 - 114 -

     1             $100,000)
     2             (Land Allocation - $10,000)
     3             (Design and Contingencies - $15,000)
     4         (10)  SR 2018, Green Hill Road Bridge under
     5             Abandoned Penn Central Railroad, West
     6             Goshen Township, Bridge Removal               125,000
     7             (Base Construction Allocation -
     8             $100,000)
     9             (Land Allocation - $10,000)
    10             (Design and Contingencies - $15,000)
    11         (11)  SR 3045, Springdell Road Bridge under
    12             Abandoned Penn Central Railroad, West
    13             Marborough Township, Bridge Removal           125,000
    14             (Base Construction Allocation -
    15             $100,000)
    16             (Land Allocation - $10,000)
    17             (Design and Contingencies - $15,000)
    18         (12)  SR 3049, Hilltop View Road Bridge
    19             over Buck and Doe Run Creek, Newlin
    20             Township, Bridge Replacement                1,450,000
    21             (Base Construction Allocation -
    22             $1,300,000)
    23             (Land Allocation - $50,000)
    24             (Design and Contingencies - $100,000)
    25         (13)  SR 1012, Bridge over Trout Creek,
    26             Tredyffrin Township, Bridge
    27             Replacement                                   850,000
    28             (Base Construction Allocation -
    29             $550,000)
    30             (Land Allocation - $50,000)
    19970S0186B0179                 - 115 -

     1             (Design and Contingencies - $250,000)
     2  Section 20.  Clarion County.
     3     (a)  Local Bridges
     4         (1)  Beaver Township, T-400, Canoe Creek
     5             Bridge over Canoe Creek, Bridge
     6             Replacement                                   380,000
     7             (Base Construction Allocation -
     8             $300,000)
     9             (Land Allocation - $10,000)
    10             (Design and Contingencies - $70,000)
    11         (2)  Beaver Township, T-422, Deer Creek
    12             Bridge over Deer Creek, Bridge
    13             Replacement                                   540,000
    14             (Base Construction Allocation -
    15             $450,000)
    16             (Land Allocation - $30,000)
    17             (Design and Contingencies - $60,000)
    18         (3)  Clarion and Millcreek Townships, T-
    19             490, Mill Creek Bridge over Mill Creek,
    20             Bridge Replacement                            540,000
    21             (Base Construction Allocation -
    22             $450,000)
    23             (Land Allocation - $10,000)
    24             (Design and Contingencies - $80,000)
    25         (4)  Elk Township, T-424, Deer Creek Bridge
    26             over Deer Creek, Bridge Replacement           545,000
    27             (Base Construction Allocation -
    28             $425,000)
    29             (Land Allocation - $20,000)
    30             (Design and Contingencies - $100,000)
    19970S0186B0179                 - 116 -

     1         (5)  Farmington Township, T-562, Walley Run
     2             Bridge over Walley Run, Bridge
     3             Replacement                                   375,000
     4             (Base Construction Allocation -
     5             $300,000)
     6             (Land Allocation - $5,000)
     7             (Design and Contingencies - $70,000)
     8         (6)  Knox Township, T-850, Toby Creek
     9             Bridge over Toby Creek, Bridge
    10             Replacement                                   480,000
    11             (Base Construction Allocation -
    12             $400,000)
    13             (Land Allocation - $20,000)
    14             (Design and Contingencies - $60,000)
    15         (7)  Knox Township, T-600, Licking Creek
    16             Bridge over Licking Creek, Bridge
    17             Replacement                                   445,000
    18             (Base Construction Allocation -
    19             $350,000)
    20             (Land Allocation - $15,000)
    21             (Design and Contingencies - $80,000)
    22         (8)  Madison Township, T-460, Red Bank
    23             Creek Bridge over Tributary of Red Bank
    24             Creek, Bridge Replacement                     390,000
    25             (Base Construction Allocation -
    26             $300,000)
    27             (Land Allocation - $20,000)
    28             (Design and Contingencies - $70,000)
    29         (9)  Porter Township, T-462, Fiddlers Run
    30             Bridge over Fiddlers Run, Bridge
    19970S0186B0179                 - 117 -

     1             Replacement                                   390,000
     2             (Base Construction Allocation -
     3             $300,000)
     4             (Land Allocation - $10,000)
     5             (Design and Contingencies - $80,000)
     6         (10)  Porter Township, T-472, Leatherwood
     7             Creek Bridge over Leatherwood Creek,
     8             Bridge Replacement                            455,000
     9             (Base Construction Allocation -
    10             $375,000)
    11             (Land Allocation - $20,000)
    12             (Design and Contingencies - $60,000)
    13         (11)  Porter Township, T-750, Leisure Run
    14             Bridge over Leisure Run, Bridge
    15             Replacement                                   390,000
    16             (Base Construction Allocation -
    17             $300,000)
    18             (Land Allocation - $10,000)
    19             (Design and Contingencies - $80,000)
    20         (12)  Red Bank Township, T-840, Beaver
    21             Creek Bridge over Beaver Creek, Bridge
    22             Replacement                                   420,000
    23             (Base Construction Allocation -
    24             $350,000)
    25             (Land Allocation - $15,000)
    26             (Design and Contingencies - $55,000)
    27         (13)  Red Bank Township, T-508, County
    28             Bridge No.46, Pine Creek Bridge over
    29             Pine Creek, Bridge Replacement                378,000
    30             (Base Construction Allocation -
    19970S0186B0179                 - 118 -

     1             $300,000)
     2             (Land Allocation - $8,000)
     3             (Design and Contingencies - $70,000)
     4         (14)  Richland Township, T-382, Turkey Run
     5             Bridge over Turkey Run, Bridge
     6             Replacement                                   360,000
     7             (Base Construction Allocation -
     8             $300,000)
     9             (Land Allocation - $10,000)
    10             (Design and Contingencies - $50,000)
    11         (15)  Richland Township, T-382, Turkey Run
    12             Bridge over Turkey Run, Bridge
    13             Replacement                                   360,000
    14             (Base Construction Allocation -
    15             $300,000)
    16             (Land Allocation - $10,000)
    17             (Design and Contingencies - $50,000)
    18         (16)  Sligo Borough, Madison Street Bridge
    19             over Little Licking Creek, Bridge
    20             Replacement                                   445,000
    21             (Base Construction Allocation -
    22             $350,000)
    23             (Land Allocation - $15,000)
    24             (Design and Contingencies - $80,000)
    25         (17)  Beaver Township, T-332 over Beaver
    26             Creek, Bridge Replacement                     400,000
    27             (Base Construction Allocation -
    28             $275,000)
    29             (Land Allocation - $50,000)
    30             (Design and Contingencies - $75,000)
    19970S0186B0179                 - 119 -

     1         (18)  Beaver Township, T-385 over Canoe
     2             Creek, Bridge Replacement                     490,000
     3             (Base Construction Allocation -
     4             $320,000)
     5             (Land Allocation - $80,000)
     6             (Design and Contingencies - $90,000)
     7         (19)  Highland Township, T-573 over Toby
     8             Creek, Bridge Replacement                     500,000
     9             (Base Construction Allocation -
    10             $360,000)
    11             (Land Allocation - $40,000)
    12             (Design and Contingencies - $100,000)
    13         (20)  Knox Township, T-850 over Step Creek,
    14             Bridge Replacement                            240,000
    15             (Base Construction Allocation -
    16             $180,000)
    17             (Land Allocation - $20,000)
    18             (Design and Contingencies - $40,000)
    19         (21)  Perry Township, T-301, Bridge
    20             Replacement                                   200,000
    21             (Base Construction Allocation -
    22             $130,000)
    23             (Land Allocation - $30,000)
    24             (Design and Contingencies - $40,000)
    25         (22)  Millcreek Township, T-564 over Little
    26             Mill Creek, Bridge Replacement                380,000
    27             (Base Construction Allocation -
    28             $300,000)
    29             (Land Allocation - $10,000)
    30             (Design and Contingencies - $70,000)
    19970S0186B0179                 - 120 -

     1         (23)  Paint Township, T-578 over Step
     2             Creek, Bridge Replacement                     360,000
     3             (Base Construction Allocation -
     4             $300,000)
     5             (Land Allocation - $10,000)
     6             (Design and Contingencies - $50,000)
     7         (24)  Monroe Township, T-486, County Bridge
     8             No.22 over Piney Creek, Bridge
     9             Replacement                                   480,000
    10             (Base Construction Allocation -
    11             $400,000)
    12             (Land Allocation - $10,000)
    13             (Design and Contingencies - $70,000)
    14         (25)  Clarion Township, T-532 over Brush
    15             Run, Bridge Replacement                       245,000
    16             (Base Construction Allocation -
    17             $200,000)
    18             (Land Allocation - $10,000)
    19             (Design and Contingencies - $35,000)
    20         (26)  Clarion Township, T-561 over Jones
    21             Run, Bridge Replacement                       245,000
    22             (Base Construction Allocation -
    23             $200,000)
    24             (Land Allocation - $10,000)
    25             (Design and Contingencies - $35,000)
    26         (27)  Elk Township, T-582 over Mahles Run,
    27             Bridge Replacement                            245,000
    28             (Base Construction Allocation -
    29             $200,000)
    30             (Land Allocation - $10,000)
    19970S0186B0179                 - 121 -

     1             (Design and Contingencies - $35,000)
     2         (28)  Farmington Township, T-609 over Engle
     3             Run, Bridge Replacement                       245,000
     4             (Base Construction Allocation -
     5             $200,000)
     6             (Land Allocation - $10,000)
     7             (Design and Contingencies - $35,000)
     8         (29)  Paint Township, T-577 over Toby
     9             Creek, Bridge Replacement                     106,000
    10             (Base Construction Allocation -
    11             $100,000)
    12             (Land Allocation - $1,000)
    13             (Design and Contingencies - $5,000)
    14         (30)  Paint Township, T-576 over Toby
    15             Creek, Bridge Replacement                     106,000
    16             (Base Construction Allocation -
    17             $100,000)
    18             (Land Allocation - $1,000)
    19             (Design and Contingencies - $5,000)
    20         (31)  Beaver Township, T-405 over Canoe
    21             Creek, Bridge Replacement                     106,000
    22             (Base Construction Allocation -
    23             $100,000)
    24             (Land Allocation - $1,000)
    25             (Design and Contingencies - $5,000)
    26         (32)  Beaver Township, T-411 over Boyd Run,
    27             Bridge Replacement                            106,000
    28             (Base Construction Allocation -
    29             $100,000)
    30             (Land Allocation - $1,000)
    19970S0186B0179                 - 122 -

     1             (Design and Contingencies - $5,000)
     2         (33)  Elk Township, T-424 over Deer Creek,
     3             Bridge Replacement                            250,000
     4             (Base Construction Allocation -
     5             $200,000)
     6             (Land Allocation - $10,000)
     7             (Design and Contingencies - $40,000)
     8     (b)  State Bridges
     9         (1)  SR 0058, Callensburg Bridge over
    10             Clarion River, Licking Township, Bridge
    11             Painting                                      365,000
    12             (Base Construction Allocation -
    13             $350,000)
    14             (Design and Contingencies - $15,000)
    15         (2)  SR 0080, Beaver Creek Eastbound Bridge
    16             over Beaver Creek, Beaver Township,
    17             Bridge Painting                               390,000
    18             (Base Construction Allocation -
    19             $375,000)
    20             (Design and Contingencies - $15,000)
    21         (3)  SR 0080, Beaver Creek Westbound Bridge
    22             over Beaver Creek, Beaver Township,
    23             Bridge Painting                               390,000
    24             (Base Construction Allocation -
    25             $375,000)
    26             (Design and Contingencies - $15,000)
    27         (4)  SR 0080, Canoe Creek Eastbound Bridge
    28             over Canoe Creek, Beaver Township,
    29             Bridge Painting                             1,230,000
    30             (Base Construction Allocation -
    19970S0186B0179                 - 123 -

     1             $1,200,000)
     2             (Design and Contingencies - $30,000)
     3         (5)  SR 0080, Canoe Creek Westbound Bridge
     4             over Canoe Creek, Beaver Township,
     5             Bridge Painting                             1,290,000
     6             (Base Construction Allocation -
     7             $1,260,000)
     8             (Design and Contingencies - $30,000)
     9         (6)  SR 0080, TR 558 Bridge over I-80,
    10             Clarion Township, Bridge Painting             195,000
    11             (Base Construction Allocation -
    12             $180,000)
    13             (Design and Contingencies - $15,000)
    14         (7)  SR 0322, Exit 11 Bridge over I-80,
    15             Clarion Township, Clarion Bridge
    16             Painting                                      205,000
    17             (Base Construction Allocation -
    18             $190,000)
    19             (Design and Contingencies - $15,000)
    20         (8)  SR 0536, Mayport Bridge over Redbank
    21             Creek, Red Bank Township, Bridge
    22             Painting                                      215,000
    23             (Base Construction Allocation -
    24             $200,000)
    25             (Design and Contingencies - $15,000)
    26         (9)  SR 1009, Brush Creek Bridge over Brush
    27             Creek, Clarion Township, Bridge
    28             Painting                                       70,000
    29             (Base Construction Allocation -
    30             $55,000)
    19970S0186B0179                 - 124 -

     1             (Design and Contingencies - $15,000)
     2         (10)  SR 2001, Piney Creek Bridge over
     3             Piney Creek, Limestone Township, Bridge
     4             Painting                                       85,000
     5             (Base Construction Allocation -
     6             $70,000)
     7             (Design and Contingencies - $15,000)
     8         (11)  SR 2001, Little Piney Creek Bridge
     9             over Little Piney Creek, Limestone
    10             Township, Bridge Painting                      70,000
    11             (Base Construction Allocation -
    12             $55,000)
    13             (Design and Contingencies - $15,000)
    14         (12)  SR 2005, Glade Run Bridge over Glade
    15             Run, Limestone Township, Bridge
    16             Painting                                       60,000
    17             (Base Construction Allocation -
    18             $45,000)
    19             (Design and Contingencies - $15,000)
    20         (13)  SR 2007, Licking Creek Bridge over
    21             Licking Creek, Monroe Township, Bridge
    22             Painting                                       75,000
    23             (Base Construction Allocation -
    24             $60,000)
    25             (Design and Contingencies - $15,000)
    26         (14)  SR 2009, Lawsonham Bridge over
    27             Redbank Creek, Madison Township, Bridge
    28             Painting                                      195,000
    29             (Base Construction Allocation -
    30             $180,000)
    19970S0186B0179                 - 125 -

     1             (Design and Contingencies - $15,000)
     2         (15)  SR 2009, Wildcat Run Bridge over
     3             Wildcat Run, Madison Township, Bridge
     4             Painting                                       85,000
     5             (Base Construction Allocation -
     6             $70,000)
     7             (Design and Contingencies - $15,000)
     8         (16)  SR 2015, Little Piney Creek Bridge
     9             over Little Piney Creek, Limestone
    10             Township, Bridge Painting                      60,000
    11             (Base Construction Allocation -
    12             $45,000)
    13             (Design and Contingencies - $15,000)
    14         (17)  SR 3020, Alum Rock Bridge over Turkey
    15             Run, Richland Township, Bridge
    16             Painting                                       75,000
    17             (Base Construction Allocation -
    18             $60,000)
    19             (Design and Contingencies - $15,000)
    20         (18)  SR 4003, Turkey Run Bridge over
    21             Turkey Run, Richland Township, Bridge
    22             Painting                                       65,000
    23             (Base Construction Allocation -
    24             $50,000)
    25             (Design and Contingencies - $15,000)
    26         (19)  SR 4005, Canoe Creek Bridge over
    27             Canoe Creek, Beaver Township, Bridge
    28             Painting                                       70,000
    29             (Base Construction Allocation -
    30             $55,000)
    19970S0186B0179                 - 126 -

     1             (Design and Contingencies - $15,000)
     2         (20)  SR 0208, Conrail Overpass, Elk
     3             Township, Bridge Removal                       55,000
     4             (Base Construction Allocation -
     5             $50,000)
     6             (Design and Contingencies - $5,000)
     7         (21)  SR 0322, Conrail Overpass, Elk
     8             Township, Bridge Removal                      210,000
     9             (Base Construction Allocation -
    10             $200,000)
    11             (Design and Contingencies - $10,000)
    12         (22)  SR 1011, Lake Erie, Franklin and
    13             Clarion Railroad Overpass, Clarion
    14             Township, Bridge Removal                       12,000
    15             (Base Construction Allocation -
    16             $10,000)
    17             (Design and Contingencies - $2,000)
    18         (23)  SR 0066, Bridge over Piney Creek,
    19             Limestone Township, Bridge Replacement        650,000
    20             (Base Construction Allocation -
    21             $500,000)
    22             (Land Allocation - $20,000)
    23             (Design and Contingencies - $130,000)
    24         (24)  SR 0066, Bridge over Little Piney
    25             Creek, Limestone Township, Bridge
    26             Replacement                                   600,000
    27             (Base Construction Allocation -
    28             $450,000)
    29             (Land Allocation - $20,000)
    30             (Design and Contingencies - $130,000)
    19970S0186B0179                 - 127 -

     1         (25)  SR 0068, Bridge over Brush Run,
     2             Monroe Township, Bridge Replacement           650,000
     3             (Base Construction Allocation -
     4             $500,000)
     5             (Land Allocation - $20,000)
     6             (Design and Contingencies - $130,000)
     7         (26)  SR 0208, Bridge over Canoe Creek,
     8             Beaver Township, Bridge Replacement           550,000
     9             (Base Construction Allocation -
    10             $400,000)
    11             (Land Allocation - $20,000)
    12             (Design and Contingencies - $130,000)
    13         (27)  SR 2001, Bridge over Little Piney
    14             Creek, Limestone Township, Bridge
    15             Replacement                                   490,000
    16             (Base Construction Allocation -
    17             $350,000)
    18             (Land Allocation - $20,000)
    19             (Design and Contingencies - $120,000)
    20         (28)  SR 0208, SR 0208 over Deer Creek, Elk
    21             Township, Bridge Replacement                  505,000
    22             (Base Construction Allocation -
    23             $450,000)
    24             (Land Allocation - $5,000)
    25             (Design and Contingencies - $50,000)
    26         (29)  SR 2007, SR 2007 over Deer Creek,
    27             Beaver Township, Bridge Replacement           455,000
    28             (Base Construction Allocation -
    29             $400,000)
    30             (Land Allocation - $5,000)
    19970S0186B0179                 - 128 -

     1             (Design and Contingencies - $50,000)
     2         (30)  SR 4005, SR 4005 over Canoe Creek,
     3             Beaver Township, Bridge Replacement           405,000
     4             (Base Construction Allocation -
     5             $350,000)
     6             (Land Allocation - $5,000)
     7             (Design and Contingencies - $50,000)
     8         (31)  SR 4008, SR 4008 over Paint Creek,
     9             Knox Township, Bridge Replacement             505,000
    10             (Base Construction Allocation -
    11             $450,000)
    12             (Land Allocation - $5,000)
    13             (Design and Contingencies - $50,000)
    14  Section 21.  Clearfield County.
    15     (a)  Local Bridges
    16         (1)  Knox Township, T-565 Bridge over Potts
    17             Run, Bridge Replacement                       510,000
    18             (Base Construction Allocation -
    19             $350,000)
    20             (Land Allocation - $10,000)
    21             (Design and Contingencies - $150,000)
    22         (2)  Houtzdale Borough, McAteer Street
    23             Bridge, Bridge Replacement                    430,000
    24             (Base Construction Allocation -
    25             $270,000)
    26             (Land Allocation - $20,000)
    27             (Design and Contingencies - $140,000)
    28         (3)  Penn Township, T-461 over Bell Run,
    29             Bridge Replacement                            106,000
    30             (Base Construction Allocation -
    19970S0186B0179                 - 129 -

     1             $100,000)
     2             (Land Allocation - $1,000)
     3             (Design and Contingencies - $5,000)
     4     (b)  State Bridges
     5         (1)  SR 0879, Bridge over US 322 near
     6             Clearfield Mall, Lawrence Township,
     7             Bridge Painting                               644,000
     8             (Base Construction Allocation -
     9             $614,000)
    10             (Design and Contingencies - $30,000)
    11         (2)  SR 0729, Bridge over Muddy Run,
    12             Beccaria Township, Bridge Painting             35,000
    13             (Base Construction Allocation -
    14             $30,000)
    15             (Design and Contingencies - $5,000)
    16         (3)  SR 0879, Bridge over Susquehanna
    17             River, Lawrence Township, Bridge
    18             Painting                                      183,000
    19             (Base Construction Allocation -
    20             $163,000)
    21             (Design and Contingencies - $20,000)
    22         (4)  SR 0970, Bridge over Moshannon Creek,
    23             Osceola Mills, Bridge Painting                145,000
    24             (Base Construction Allocation -
    25             $120,000)
    26             (Design and Contingencies - $25,000)
    27         (5)  SR 0970, Bridge over Susquehanna
    28             River, Village of Shawville, Bridge
    29             Painting                                      163,000
    30             (Base Construction Allocation -
    19970S0186B0179                 - 130 -

     1             $143,000)
     2             (Design and Contingencies - $20,000)
     3         (6)  SR 1009, Bridge over Alder Run, Morris
     4             Township, Bridge Painting                      18,000
     5             (Base Construction Allocation -
     6             $15,000)
     7             (Design and Contingencies - $3,000)
     8         (7)  SR 1014, Bridge over Alder Run, Graham
     9             Township, Bridge Painting                      18,000
    10             (Base Construction Allocation -
    11             $15,000)
    12             (Design and Contingencies - $3,000)
    13         (8)  SR 2010, Bridge over Beaver Run,
    14             Woodward Township, Bridge Painting             18,000
    15             (Base Construction Allocation -
    16             $15,000)
    17             (Design and Contingencies - $3,000)
    18         (9)  SR 2024, Bridge over Conrail, Pike
    19             Township, Bridge Painting                      28,000
    20             (Base Construction Allocation -
    21             $24,000)
    22             (Design and Contingencies - $4,000)
    23         (10)  SR 3001, Bridge over Chest Creek,
    24             Mahaffey Borough, Bridge Replacement        1,750,000
    25             (Base Construction Allocation -
    26             $1,300,000)
    27             (Land Allocation - $150,000)
    28             (Design and Contingencies - $300,000)
    29         (11)  SR 3012, Bridge over Matthews Run,
    30             Beccaria Township, Bridge Painting             18,000
    19970S0186B0179                 - 131 -

     1             (Base Construction Allocation -
     2             $15,000)
     3             (Design and Contingencies - $3,000)
     4         (12)  SR 3012, Bridge over Clearfield
     5             Creek, Beccaria Township, Bridge
     6             Painting                                      100,000
     7             (Base Construction Allocation -
     8             $90,000)
     9             (Design and Contingencies - $10,000)
    10         (13)  SR 0219, SR 0219 over Bear Run, Bell
    11             Township, Bridge Replacement                  505,000
    12             (Base Construction Allocation -
    13             $450,000)
    14             (Land Allocation - $5,000)
    15             (Design and Contingencies - $50,000)
    16  Section 22.  Clinton County.
    17     (a)  Local Bridges
    18         (1)  Mill Hall Borough, Church Street over
    19             Fishing Creek, Bridge Rehabilitation            5,000
    20             (Base Construction Allocation - $4,000)
    21             (Design and Contingencies - $1,000)
    22     (b)  State Bridges
    23         (1)  SR 0044, Bridge over SR 0220, 1 Mile
    24             Northeast of Avis, Pine Creek Township,
    25             Bridge Painting                               580,000
    26             (Base Construction Allocation -
    27             $525,000)
    28             (Design and Contingencies - $55,000)
    29         (2)  SR 0080, Lamar Interchange (Two
    30             Bridges) over PA 64 at Exit 25, Porter
    19970S0186B0179                 - 132 -

     1             Township, Bridge Rehabilitation             4,100,000
     2             (Base Construction Allocation -
     3             $3,400,000)
     4             (Design and Contingencies - $700,000)
     5         (3)  SR 0144, Bridge over Kettle Creek, 1
     6             Mile East of Hammersley Fork, Leidy
     7             Township, Bridge Painting                     660,000
     8             (Base Construction Allocation -
     9             $600,000)
    10             (Design and Contingencies - $60,000)
    11  Section 23.  Columbia County.
    12     (a)  Local Bridges (Reserved)
    13     (b)  State Bridges
    14         (1)  SR 0044, Chillisquaque Creek Bridge
    15             over Chillisquaque Creek, 3 Miles
    16             Northwest of Jerseytown, Bridge
    17             Replacement                                   477,000
    18             (Base Construction Allocation -
    19             $382,000)
    20             (Land Allocation - $24,000)
    21             (Design and Contingencies - $71,000)
    22         (2)  SR 0093, Bridge over North Branch of
    23             Briar Creek, Bridge Replacement               350,000
    24             (Base Construction Allocation -
    25             $275,000)
    26             (Land Allocation - $15,000)
    27             (Design and Contingencies - $60,000)
    28         (3)  SR 0093, Briar Creek Bridge over Briar
    29             Creek, 3 Miles West of Berwick, Bridge
    30             Replacement                                   392,000
    19970S0186B0179                 - 133 -

     1             (Base Construction Allocation -
     2             $315,000)
     3             (Land Allocation - $18,000)
     4             (Design and Contingencies - $59,000)
     5         (4)  SR 0239, West Creek Bridge over West
     6             Creek, Southeast of Benton and
     7             Sugarloaf Townships, Bridge
     8             Replacement                                   670,000
     9             (Base Construction Allocation -
    10             $536,000)
    11             (Land Allocation - $34,000)
    12             (Design and Contingencies - $100,000)
    13         (5)  SR 0442, West Branch Run Bridge over
    14             West Branch Run, 1.5 Miles North of
    15             Iola, Bridge Replacement                      206,000
    16             (Base Construction Allocation -
    17             $165,000)
    18             (Land Allocation - $10,000)
    19             (Design and Contingencies - $31,000)
    20         (6)  SR 1004, Erie-Lackawanna Railroad
    21             Bridge, Viaduct over Conrail, South
    22             Centre Township, Bridge Replacement         1,900,000
    23             (Base Construction Allocation -
    24             $1,600,000)
    25             (Land Allocation - $110,000)
    26             (Design and Contingencies - $190,000)
    27         (7)  SR 1019, Briar Creek Bridge over Briar
    28             Creek, Briar Creek Township, Bridge
    29             Replacement                                   404,000
    30             (Base Construction Allocation -
    19970S0186B0179                 - 134 -

     1             $323,000)
     2             (Land Allocation - $20,000)
     3             (Design and Contingencies - $61,000)
     4         (8)  SR 4012, Little Hemlock Creek Bridge
     5             over Little Hemlock Creek, 10 Miles
     6             Southeast of Jerseytown, Bridge
     7             Replacement                                   284,000
     8             (Base Construction Allocation -
     9             $227,000)
    10             (Land Allocation - $14,000)
    11             (Design and Contingencies - $43,000)
    12         (9)  SR 4037, Mud Run Bridge over Mud Run,
    13             5 Miles Northwest of Millville Borough,
    14             Bridge Replacement                            307,000
    15             (Base Construction Allocation -
    16             $246,000)
    17             (Land Allocation - $15,000)
    18             (Design and Contingencies - $46,000)
    19         (10)  SR 0011, Bridge over Fishing Creek,
    20             Bridge Painting                               530,000
    21             (Base Construction Allocation -
    22             $520,000)
    23             (Design and Contingencies - $10,000)
    24         (11)  SR 1022, Bridge over Fishing Creek,
    25             Bridge Painting                               380,000
    26             (Base Construction Allocation -
    27             $370,000)
    28             (Design and Contingencies - $10,000)
    29         (12)  SR 1022, Bridge over Old Channel,
    30             Bridge Painting                               125,000
    19970S0186B0179                 - 135 -

     1             (Base Construction Allocation -
     2             $115,000)
     3             (Design and Contingencies - $10,000)
     4         (13)  SR 4009, Bridge over Fishing Creek,
     5             Bridge Painting                               315,000
     6             (Base Construction Allocation -
     7             $305,000)
     8             (Design and Contingencies - $10,000)
     9         (14)  SR 0042, SR 0042 over Roaring Creek,
    10             Conyngham Township, Bridge Replacement        457,000
    11             (Base Construction Allocation -
    12             $366,000)
    13             (Land Allocation - $23,000)
    14             (Design and Contingencies - $68,000)
    15         (15)  SR 0239, SR 0239 over West Creek,
    16             Benton Township, Bridge Replacement           760,000
    17             (Base Construction Allocation -
    18             $560,000)
    19             (Land Allocation - $35,000)
    20             (Design and Contingencies - $165,000)
    21         (16)  SR 0254, SR 0254 over Little Fishing
    22             Creek, Millville Borough, Bridge
    23             Replacement                                 1,020,000
    24             (Base Construction Allocation -
    25             $816,000)
    26             (Land Allocation - $51,000)
    27             (Design and Contingencies - $153,000)
    28         (17)  SR 0339, SR 0339 over Beaver Run,
    29             Beaver Township, Bridge Replacement           320,000
    30             (Base Construction Allocation -
    19970S0186B0179                 - 136 -

     1             $256,000)
     2             (Land Allocation - $16,000)
     3             (Design and Contingencies - $48,000)
     4         (18)  SR 0487, SR 0487 over Stony Brook,
     5             Orange Township, Bridge Replacement           380,000
     6             (Base Construction Allocation -
     7             $304,000)
     8             (Land Allocation - $19,000)
     9             (Design and Contingencies - $57,000)
    10         (19)  SR 1014, SR 1014 over Little Briar
    11             Creek, Briar Creek Township, Bridge
    12             Replacement                                   415,000
    13             (Base Construction Allocation -
    14             $332,000)
    15             (Land Allocation - $21,000)
    16             (Design and Contingencies - $62,000)
    17         (20)  SR 1023, SR 1023 over East Briar
    18             Creek, Briar Creek Township, Bridge
    19             Replacement                                   520,000
    20             (Base Construction Allocation -
    21             $466,000)
    22             (Land Allocation - $29,000)
    23             (Design and Contingencies - $25,000)
    24         (21)  SR 2003, SR 2003 over Tributary of
    25             Roaring Creek, Roaring Creek Township,
    26             Bridge Replacement                            171,000
    27             (Base Construction Allocation -
    28             $136,000)
    29             (Land Allocation - $10,000)
    30             (Design and Contingencies - $25,000)
    19970S0186B0179                 - 137 -

     1         (22)  SR 2003, SR 2003 over Tributary of
     2             Roaring Creek, Locust Township, Bridge
     3             Replacement                                   245,000
     4             (Base Construction Allocation -
     5             $196,000)
     6             (Land Allocation - $12,000)
     7             (Design and Contingencies - $37,000)
     8         (23)  SR 2009, SR 2009 over Catawissa
     9             Creek, Main Township, Bridge
    10             Replacement                                   436,000
    11             (Base Construction Allocation -
    12             $349,000)
    13             (Land Allocation - $22,000)
    14             (Design and Contingencies - $65,000)
    15         (24)  SR 4009, SR 4009 over Little Fishing
    16             Creek, Mt. Pleasant Township, Bridge
    17             Replacement                                 1,232,000
    18             (Base Construction Allocation -
    19             $986,000)
    20             (Land Allocation - $61,000)
    21             (Design and Contingencies - $185,000)
    22         (25)  SR 4033, SR 4033 over Wolfhouse Run,
    23             Pine Township, Bridge Replacement             252,000
    24             (Base Construction Allocation -
    25             $202,000)
    26             (Land Allocation - $12,000)
    27             (Design and Contingencies - $38,000)
    28         (26)  SR 4045, SR 4045 over Green Creek,
    29             Greenwood Township, Bridge Replacement        435,000
    30             (Base Construction Allocation -
    19970S0186B0179                 - 138 -

     1             $348,000)
     2             (Land Allocation - $22,000)
     3             (Design and Contingencies - $65,000)
     4         (27)  SR 4049, SR 4049 over Coles Creek,
     5             Sugarloaf Township, Bridge Replacement      1,095,000
     6             (Base Construction Allocation -
     7             $876,000)
     8             (Land Allocation - $55,000)
     9             (Design and Contingencies - $164,000)
    10  Section 24.  Crawford County.
    11     (a) Local Bridges
    12         (1)  Fairfield Township, T-636 over Branch
    13             of French Creek, Bridge Replacement           108,000
    14             (Base Construction Allocation -
    15             $100,000)
    16             (Land Allocation - $1,000)
    17             (Design and Contingencies - $7,000)
    18         (2)  Fairfield Township, T-321 Bridge No.1
    19             over Branch of French Creek, Bridge
    20             Replacement                                   106,000
    21             (Base Construction Allocation -
    22             $100,000)
    23             (Land Allocation - $1,000)
    24             (Design and Contingencies - $5,000)
    25         (3)  Fairfield Township, T-321 Bridge No.2
    26             over Branch of French Creek, Bridge
    27             Replacement                                   106,000
    28             (Base Construction Allocation -
    29             $100,000)
    30             (Land Allocation - $1,000)
    19970S0186B0179                 - 139 -

     1             (Design and Contingencies - $5,000)
     2         (4)  Spring Township, T-747 over Branch of
     3             Conneaut Creek, Bridge Replacement            126,000
     4             (Base Construction Allocation -
     5             $120,000)
     6             (Land Allocation - $1,000)
     7             (Design and Contingencies - $5,000)
     8         (5)  Wayne Township, T-347 over Branch of
     9             Powdermill Run, Bridge Replacement            106,000
    10             (Base Construction Allocation -
    11             $100,000)
    12             (Land Allocation - $1,000)
    13             (Design and Contingencies - $5,000)
    14         (6)  Wayne Township, T-457 over Tributary
    15             of Lake Creek, Bridge Replacement             106,000
    16             (Base Construction Allocation -
    17             $100,000)
    18             (Land Allocation - $1,000)
    19             (Design and Contingencies - $5,000)
    20     (b)  State Bridges
    21         (1)  SR 0006, SR 0006 over Padan Creek,
    22             Conneaut Township, Bridge Replacement       1,004,000
    23             (Base Construction Allocation -
    24             $784,000)
    25             (Land Allocation - $20,000)
    26             (Design and Contingencies - $200,000)
    27         (2)  SR 0006, SR 0006 over French Creek,
    28             Woodcock Township, Bridge Replacement       2,325,000
    29             (Base Construction Allocation -
    30             $1,840,000)
    19970S0186B0179                 - 140 -

     1             (Land Allocation - $20,000)
     2             (Design and Contingencies - $465,000)
     3         (3)  SR 0079, SR 0079 under Maple Drive,
     4             Hayfield Township, Bridge Replacement       2,401,000
     5             (Base Construction Allocation -
     6             $1,901,000)
     7             (Land Allocation - $20,000)
     8             (Design and Contingencies - $480,000)
     9         (4)  SR 0089, SR 0089 over Shirley Run,
    10             Rome Township, Bridge Replacement             510,000
    11             (Base Construction Allocation -
    12             $420,000)
    13             (Land Allocation - $20,000)
    14             (Design and Contingencies - $70,000)
    15         (5)  SR 0098, SR 0098 over Van Horne Run,
    16             Vernon Township, Bridge Replacement           320,000
    17             (Base Construction Allocation -
    18             $260,000)
    19             (Land Allocation - $10,000)
    20             (Design and Contingencies - $50,000)
    21         (6)  SR 0099, SR 0099 over Little
    22             Conneauttee Creek, Cambridge Township,
    23             Bridge Replacement                            950,000
    24             (Base Construction Allocation -
    25             $700,000)
    26             (Land Allocation - $50,000)
    27             (Design and Contingencies - $200,000)
    28         (7)  SR 0099, SR 0099 over Conneaut Creek,
    29             Cambridge Township, Bridge Replacement        600,000
    30             (Base Construction Allocation -
    19970S0186B0179                 - 141 -

     1             $500,000)
     2             (Land Allocation - $30,000)
     3             (Design and Contingencies - $70,000)
     4         (8)  SR 0198, SR 0198 over Carr Run,
     5             Woodcock Township, Bridge Replacement         260,000
     6             (Base Construction Allocation -
     7             $200,000)
     8             (Land Allocation - $20,000)
     9             (Design and Contingencies - $40,000)
    10         (9)  SR 0285, SR 0285 over Bennett Run,
    11             North Shenango Township, Bridge
    12             Replacement                                   750,000
    13             (Base Construction Allocation -
    14             $650,000)
    15             (Land Allocation - $20,000)
    16             (Design and Contingencies - $80,000)
    17         (10)  SR 1002, SR 1002 over Acker Run,
    18             Venango Township, Bridge Replacement          370,000
    19             (Base Construction Allocation -
    20             $300,000)
    21             (Land Allocation - $20,000)
    22             (Design and Contingencies - $50,000)
    23         (11)  SR 1024, SR 1024 over Britton Run,
    24             Sparta Township, Bridge Replacement           340,000
    25             (Base Construction Allocation -
    26             $250,000)
    27             (Land Allocation - $20,000)
    28             (Design and Contingencies - $70,000)
    29         (12)  SR 2005, SR 2005 over French Creek,
    30             East Fairfield Township, Bridge
    19970S0186B0179                 - 142 -

     1             Replacement                                 1,300,000
     2             (Base Construction Allocation -
     3             $1,130,000)
     4             (Land Allocation - $20,000)
     5             (Design and Contingencies - $150,000)
     6         (13)  SR 2010, SR 2010 over Little Sugar
     7             Creek, Wayne Township, Bridge
     8             Replacement                                   260,000
     9             (Base Construction Allocation -
    10             $200,000)
    11             (Land Allocation - $20,000)
    12             (Design and Contingencies - $40,000)
    13         (14)  SR 3016, SR 3016 over B&LE Railroad,
    14             Summit Township, Bridge Replacement         1,150,000
    15             (Base Construction Allocation -
    16             $1,000,000)
    17             (Land Allocation - $30,000)
    18             (Design and Contingencies - $120,000)
    19         (15)  SR 0018, SR 0018 Bridge over
    20             Tributary of Conneaut Creek, Summit
    21             Township, Bridge Rehabilitation               115,000
    22             (Base Construction Allocation -
    23             $100,000)
    24             (Design and Contingencies - $15,000)
    25         (16)  SR 0098, SR 0098 Bridge over
    26             Tributary of Cussewago Creek, Hayfield
    27             Township, Bridge Rehabilitation               110,000
    28             (Base Construction Allocation -
    29             $100,000)
    30             (Design and Contingencies - $10,000)
    19970S0186B0179                 - 143 -

     1  Section 25.  (Reserved).
     2  Section 26.  Dauphin County.
     3     (a)  Local Bridges
     4         (1)  City of Harrisburg, Mulberry Street
     5             Ramp to Cameron Street, Bridge
     6             Rehabilitation                                108,000
     7             (Base Construction Allocation -
     8             $73,000)
     9             (Land Allocation - $10,000)
    10             (Design and Contingencies - $ 25,000)
    11         (2)  City of Harrisburg, Maclay Street
    12             Bridge over Railroad, Bridge
    13             Rehabilitation                                218,000
    14             (Base Construction Allocation -
    15             $183,000)
    16             (Land Allocation - $10,000)
    17             (Design and Contingencies - $25,000)
    18         (3)  Mifflin Township, T-631, Reitz Road
    19             Bridge over Little Wiconisco Creek,
    20             County Bridge No.24, Bridge
    21             Replacement                                   290,000
    22             (Base Construction Allocation -
    23             $200,000)
    24             (Land Allocation - $10,000)
    25             (Design and Contingencies - $80,000)
    26         (4)  Mifflin Township, T-556, Kessler Road
    27             Bridge over Little Wiconisco Creek,
    28             Bridge Replacement                            235,000
    29             (Base Construction Allocation -
    30             $150,000)
    19970S0186B0179                 - 144 -

     1             (Land Allocation - $10,000)
     2             (Design and Contingencies - $75,000)
     3         (5)  Washington Township, Bolts Road Bridge
     4             over Wiconisco Creek, Bridge
     5             Rehabilitation                                469,000
     6             (Base Construction Allocation -
     7             $374,000)
     8             (Land Allocation - $10,000)
     9             (Design and Contingencies - $85,000)
    10         (6)  Wayne Township, T-496, Lebo Road
    11             Bridge over Powell Creek, Bridge
    12             Rehabilitation                                263,000
    13             (Base Construction Allocation -
    14             $168,000)
    15             (Land Allocation - $10,000)
    16             (Design and Contingencies - $85,000)
    17         (7)  Conewago Township, T-602 and T-749
    18             over Conewago Creek, Bridge
    19             Replacement                                   722,000
    20             (Base Construction Allocation -
    21             $556,000)
    22             (Land Allocation - $10,000)
    23             (Design and Contingencies - $156,000)
    24         (8)  Halifax Township, T-454 over Armstrong
    25             Creek, Bridge Replacement                     480,000
    26             (Base Construction Allocation -
    27             $367,000)
    28             (Land Allocation - $10,000)
    29             (Design and Contingencies - $103,000)
    30         (9)  Jackson Township, T-544 over Armstrong
    19970S0186B0179                 - 145 -

     1             Creek, Bridge Replacement                     379,000
     2             (Base Construction Allocation -
     3             $288,000)
     4             (Land Allocation - $10,000)
     5             (Design and Contingencies - $81,000)
     6         (10)  Jefferson Township, T-534 over Powell
     7             Creek, Bridge Replacement                     397,000
     8             (Base Construction Allocation -
     9             $302,000)
    10             (Land Allocation - $10,000)
    11             (Design and Contingencies - $85,000)
    12         (11)  Upper Paxton Township, T-460 over
    13             Wiconisco Creek, Bridge Replacement           427,000
    14             (Base Construction Allocation -
    15             $326,000)
    16             (Land Allocation - $10,000)
    17             (Design and Contingencies - $91,000)
    18         (12)  Washington Township, T-595 over
    19             Wiconisco Creek, Bridge Replacement           669,000
    20             (Base Construction Allocation -
    21             $515,000)
    22             (Land Allocation - $10,000)
    23             (Design and Contingencies - $144,000)
    24         (13)  Washington Township, T-462 over
    25             Wiconisco Creek, Bridge Replacement           668,000
    26             (Base Construction Allocation -
    27             $514,000)
    28             (Land Allocation - $10,000)
    29             (Design and Contingencies - $144,000)
    30         (14)  Wayne Township, T-448 over Powell
    19970S0186B0179                 - 146 -

     1             Creek, Bridge Replacement                     438,000
     2             (Base Construction Allocation -
     3             $334,000)
     4             (Land Allocation (Design and
     5             Contingencies - $94,000)
     6     (b)  State Bridges (Reserved)
     7  Section 27.  Delaware County.
     8     (a)  Local Bridges
     9         (1)  City of Chester, West 7th Street,
    10             County Bridge No.186 over Chester
    11             Creek, Bridge Replacement                   1,630,000
    12             (Base Construction Allocation -
    13             $1,470,000)
    14             (Land Allocation - $10,000)
    15             (Design and Contingencies - $150,000)
    16     (b)  State Bridges
    17         (1)  SR 0030, Pedestrian Tunnel under SR
    18             0030 and Ithan Avenue at Villanova
    19             University, Radnor Township, Pedestrian
    20             Facilities                                  7,360,000
    21             (Base Construction Allocation -
    22             $6,500,000)
    23             (Land Allocation - $650,000)
    24             (Design and Contingencies - $210,000)
    25         (2)  SR 1015, Darby-Paoli Road Bridge over
    26             Branch of Little Darby Creek, Radnor
    27             Township, Bridge Replacement                1,000,000
    28             (Base Construction Allocation -
    29             $760,000)
    30             (Land Allocation - $40,000)
    19970S0186B0179                 - 147 -

     1             (Design and Contingencies - $200,000)
     2         (3)  SR 0291, 4th Street Bridge over Ridley
     3             Creek, Chester Township, Bridge
     4             Painting                                      291,000
     5             (Base Construction Allocation -
     6             $253,000)
     7             (Design and Contingencies - $38,000)
     8         (4)  SR 0291, Essington Avenue Bridge over
     9             Darby Creek, Ridley Township, Bridge
    10             Painting                                      546,000
    11             (Base Construction Allocation -
    12             $487,000)
    13             (Design and Contingencies - $59,000)
    14         (5)  SR 1019, Conestoga Road Bridge over
    15             PennDOT Railroad Right-of-Way, Radnor
    16             Township, Bridge Removal                      125,000
    17             (Base Construction Allocation -
    18             $100,000)
    19             (Land Allocation - $10,000)
    20             (Design and Contingencies - $15,000)
    21         (6)  SR 3019, Rosevally Road Bridge over
    22             SEPTA, Upper Providence Township,
    23             Bridge Replacement                            875,000
    24             (Base Construction Allocation -
    25             $700,000)
    26             (Land Allocation - $100,000)
    27             (Design and Contingencies - $75,000)
    28  Section 28.  Elk County.
    29     (a)  Local Bridges
    30         (1)  Village of Wilcox, T-631, Bridge over
    19970S0186B0179                 - 148 -

     1             Clarion River, Bridge Replacement           1,100,000
     2             (Base Construction Allocation -
     3             $850,000)
     4             (Land Allocation - $50,000)
     5             (Design and Contingencies - $200,000)
     6     (b)  State Bridges (Reserved)
     7  Section 29.  Erie County.
     8     (a)  Local Bridges
     9         (1)  Girard Township, Beckman Bridge over
    10             I-90, Bridge Painting                         200,000
    11             (Base Construction Allocation -
    12             $200,000)
    13         (2)  Millcreek Township, T-707, Zimmerly
    14             Road Bridge over I-79, New 2-Lane
    15             Bridge Construction, New Bridge             2,150,000
    16             (Base Construction Allocation -
    17             $1,900,000)
    18             (Land Allocation - $50,000)
    19             (Design and Contingencies - $200,000)
    20         (3)  City of Erie, Norman Way, Bridge over
    21             Millcreek, Bridge Rehabilitation              225,000
    22             (Base Construction Allocation -
    23             $200,000)
    24             (Design and Contingencies - $25,000)
    25         (4)  City of Erie, McBride Viaduct-East
    26             Avenue, Bridge over Railroad Lines,
    27             Bridge Rehabilitation                       1,340,000
    28             (Base Construction Allocation -
    29             $1,300,000)
    30             (Design and Contingencies - $40,000)
    19970S0186B0179                 - 149 -

     1         (5)  City of Erie, Kahkwa Bridge over
     2             Ravine Drive, Bridge Rehabilitation            60,000
     3             (Base Construction Allocation -
     4             $50,000)
     5             (Design and Contingencies - $10,000)
     6         (6)  Greenfield Township, T-974, Old Route
     7             89 Bridge over West Branch of French
     8             Creek Tributary, Bridge Replacement           350,000
     9             (Base Construction Allocation -
    10             $300,000)
    11             (Land Allocation - $10,000)
    12             (Design and Contingencies - $40,000)
    13         (7)  Franklin Township, T-479, Bridge No.1
    14             over Falk Run, Bridge Replacement             350,000
    15             (Base Construction Allocation -
    16             $300,000)
    17             (Land Allocation - $10,000)
    18             (Design and Contingencies - $40,000)
    19         (8)  Franklin Township, T-479, Bridge No.2
    20             over Falk Run, Bridge Replacement             350,000
    21             (Base Construction Allocation -
    22             $300,000)
    23             (Land Allocation - $10,000)
    24             (Design and Contingencies - $40,000)
    25         (9)  Franklin Township, T-424, Falls Road
    26             Bridge over Falk Run, Bridge
    27             Replacement                                   300,000
    28             (Base Construction Allocation -
    29             $250,000)
    30             (Land Allocation - $10,000)
    19970S0186B0179                 - 150 -

     1             (Design and Contingencies - $40,000)
     2     (b)  State Bridges
     3         (1)  SR 0005, SR 0005 over Scott Run,
     4             Harborcreek Township, Bridge
     5             Replacement                                   140,000
     6             (Base Construction Allocation -
     7             $100,000)
     8             (Land Allocation - $10,000)
     9             (Design and Contingencies - $30,000)
    10         (2)  SR 0006, SR 0006 over French Creek, Le
    11             Boeuf Township, Bridge Replacement            700,000
    12             (Base Construction Allocation -
    13             $600,000)
    14             (Land Allocation - $20,000)
    15             (Design and Contingencies - $80,000)
    16         (3)  SR 0019, SR 0019 over LeBoeuf Creek,
    17             Waterford Township, Bridge Replacement        950,000
    18             (Base Construction Allocation -
    19             $840,000)
    20             (Land Allocation - $30,000)
    21             (Design and Contingencies - $80,000)
    22         (4)  SR 0020, SR 0020 over I-79, City of
    23             Erie, Bridge Replacement                    2,000,000
    24             (Base Construction Allocation -
    25             $1,770,000)
    26             (Land Allocation - $30,000)
    27             (Design and Contingencies - $200,000)
    28         (5)  SR 0089, SR 0089 over Sixteen Mile
    29             Creek, North East Township, Bridge
    30             Replacement                                   490,000
    19970S0186B0179                 - 151 -

     1             (Base Construction Allocation -
     2             $400,000)
     3             (Land Allocation - $20,000)
     4             (Design and Contingencies - $70,000)
     5         (6)  SR 0090, SR 0090 over Crooked Creek,
     6             Girard Township, Bridge Replacement         1,420,000
     7             (Base Construction Allocation -
     8             $1,330,000)
     9             (Land Allocation - $30,000)
    10             (Design and Contingencies - $60,000)
    11         (7)  SR 0090, SR 0090 under Cherry Street,
    12             Summit Township, Bridge Replacement         1,600,000
    13             (Base Construction Allocation -
    14             $1,410,000)
    15             (Land Allocation - $40,000)
    16             (Design and Contingencies - $150,000)
    17         (8)  SR 0090, SR 0090 under Clark Road,
    18             Harborcreek Township, Bridge
    19             Replacement                                 2,100,000
    20             (Base Construction Allocation -
    21             $1,880,000)
    22             (Land Allocation - $40,000)
    23             (Design and Contingencies - $180,000)
    24         (9)  SR 0098, SR 0098 over Cussewago Creek,
    25             Elk Creek Township, Bridge Replacement        400,000
    26             (Base Construction Allocation -
    27             $300,000)
    28             (Land Allocation - $20,000)
    29             (Design and Contingencies - $80,000)
    30         (10)  SR 0474, SR 0474 over Dean Run,
    19970S0186B0179                 - 152 -

     1             Venango Township, Bridge Replacement          200,000
     2             (Base Construction Allocation -
     3             $160,000)
     4             (Land Allocation - $10,000)
     5             (Design and Contingencies - $30,000)
     6         (11)  SR 1001, SR 1001 over Conrail,
     7             Millcreek Township, Bridge Replacement        720,000
     8             (Base Construction Allocation -
     9             $600,000)
    10             (Land Allocation - $20,000)
    11             (Design and Contingencies - $100,000)
    12         (12)  SR 1011, SR 1011 over Alder Brook,
    13             Venango Township, Bridge Replacement          470,000
    14             (Base Construction Allocation -
    15             $400,000)
    16             (Land Allocation - $10,000)
    17             (Design and Contingencies - $60,000)
    18         (13)  SR 1013, SR 1013 over I-90, North
    19             East Township, Bridge Replacement           1,220,000
    20             (Base Construction Allocation -
    21             $1,100,000)
    22             (Land Allocation - $20,000)
    23             (Design and Contingencies - $100,000)
    24         (14)  SR 3001, SR 3001 over Conneaut Creek,
    25             Conneaut Township, Bridge Replacement       1,020,000
    26             (Base Construction Allocation -
    27             $900,000)
    28             (Land Allocation - $20,000)
    29             (Design and Contingencies - $100,000)
    30         (15)  SR 3003, SR 3003 over West Branch
    19970S0186B0179                 - 153 -

     1             Conneaut Creek, Conneaut Township,
     2             Bridge Replacement                            630,000
     3             (Base Construction Allocation -
     4             $550,000)
     5             (Land Allocation - $20,000)
     6             (Design and Contingencies - $60,000)
     7         (16)  SR 3014, SR 3014 over Trout Run,
     8             Waterford Borough, Bridge Replacement         370,000
     9             (Base Construction Allocation -
    10             $300,000)
    11             (Land Allocation - $20,000)
    12             (Design and Contingencies - $50,000)
    13         (17)  SR 4007, SR 4007 over I-90, Fairview
    14             Township, Bridge Replacement                1,920,000
    15             (Base Construction Allocation -
    16             $1,800,000)
    17             (Land Allocation - $20,000)
    18             (Design and Contingencies - $100,000)
    19  Section 30.  Fayette County.
    20     (a)  Local Bridges
    21         (1)  Brownsville Township, Lynn Run Road
    22             Bridge over Redstone Creek, Bridge
    23             Replacement                                   200,000
    24             (Base Construction Allocation -
    25             $130,000)
    26             (Land Allocation - $10,000)
    27             (Design and Contingencies - $60,000)
    28         (2)  Dunbar Township, Falls Avenue Bridge
    29             over Possum Run, Bridge Replacement           450,000
    30             (Base Construction Allocation -
    19970S0186B0179                 - 154 -

     1             $350,000)
     2             (Land Allocation - $15,000)
     3             (Design and Contingencies - $85,000)
     4         (3)  Georges Township, County Bridge No.162
     5             over Mountain Creek, Bridge
     6             Replacement                                   370,000
     7             (Base Construction Allocation -
     8             $300,000)
     9             (Land Allocation - $5,000)
    10             (Design and Contingencies - $65,000)
    11         (4)  German Township, Footedale Bridge
    12             No.66 over Dunlap Creek, Bridge
    13             Replacement                                   415,000
    14             (Base Construction Allocation -
    15             $330,000)
    16             (Land Allocation - $10,000)
    17             (Design and Contingencies - $75,000)
    18         (5)  German Township, County Bridge No.54
    19             over Browns Run, Bridge Replacement           430,000
    20             (Base Construction Allocation -
    21             $355,000)
    22             (Land Allocation - $5,000)
    23             (Design and Contingencies - $70,000)
    24         (6)  German Township, Leckrone Bridge No.54
    25             over Browns Run, Bridge Replacement           430,000
    26             (Base Construction Allocation -
    27             $350,000)
    28             (Land Allocation - $5,000)
    29             (Design and Contingencies - $75,000)
    30         (7)  Menallen Township, T-509, Bridge over
    19970S0186B0179                 - 155 -

     1             Branch of Dunlap Creek, Bridge
     2             Replacement                                   165,000
     3             (Base Construction Allocation -
     4             $110,000)
     5             (Land Allocation - $5,000)
     6             (Design and Contingencies - $50,000)
     7         (8)  Menallen Township, Fan Hallow Road
     8             Bridge over Fans Run, Bridge
     9             Replacement                                   145,000
    10             (Base Construction Allocation -
    11             $90,000)
    12             (Land Allocation - $5,000)
    13             (Design and Contingencies - $50,000)
    14         (9)  Menallen and North Union Townships,
    15             Fan Hollow Bridge No.184 over Jennings
    16             Run, Bridge Replacement                       440,000
    17             (Base Construction Allocation -
    18             $350,000)
    19             (Land Allocation - $10,000)
    20             (Design and Contingencies - $80,000)
    21         (10)  Nicholson Township, County Bridge
    22             No.29 over York Run, Bridge
    23             Replacement                                   360,000
    24             (Base Construction Allocation -
    25             $295,000)
    26             (Land Allocation - $5,000)
    27             (Design and Contingencies - $60,000)
    28         (11)  Redstone Township, Merrittstown
    29             Bridge No.147 over Dunlap Creek, Bridge
    30             Replacement                                   435,000
    19970S0186B0179                 - 156 -

     1             (Base Construction Allocation -
     2             $350,000)
     3             (Land Allocation - $10,000)
     4             (Design and Contingencies - $75,000)
     5         (12)  South Union Township, Leith Bridge
     6             No.41 over Redstone Creek, Bridge
     7             Replacement                                   450,000
     8             (Base Construction Allocation -
     9             $360,000)
    10             (Land Allocation - $10,000)
    11             (Design and Contingencies - $80,000)
    12         (13)  Steward Township, Meadow Run Bridge
    13             No.82 over Meadow Run, Bridge
    14             Replacement                                   450,000
    15             (Base Construction Allocation -
    16             $360,000)
    17             (Land Allocation - $10,000)
    18             (Design and Contingencies - $80,000)
    19         (14)  Springhill Township, T-335, County
    20             Bridge No.92 over York Run, Bridge
    21             Replacement                                 1,438,000
    22             (Base Construction Allocation -
    23             $1,113,000)
    24             (Land Allocation - $75,000)
    25             (Design and Contingencies - $250,000)
    26         (15)  Springfield Township, T-593, County
    27             Bridge No.111 over Mill Run, Bridge
    28             Replacement                                   320,000
    29             (Base Construction Allocation -
    30             $225,000)
    19970S0186B0179                 - 157 -

     1             (Land Allocation - $20,000)
     2             (Design and Contingencies - $75,000)
     3         (16)  North Union Township, T-535 over
     4             Redstone Creek, Bridge Replacement            825,000
     5             (Base Construction Allocation -
     6             $625,000)
     7             (Land Allocation - $25,000)
     8             (Design and Contingencies - $175,000)
     9         (17)  North Union Township, T-557 over
    10             Redstone Creek, Bridge Replacement            450,000
    11             (Base Construction Allocation -
    12             $275,000)
    13             (Land Allocation - $50,000)
    14             (Design and Contingencies - $125,000)
    15     (b)  State Bridges
    16         (1)  SR 0021, Masontown Bridge over
    17             Monongahela River, Railroad and Private
    18             Road, German Township, Bridge Painting      1,500,000
    19             (Base Construction Allocation -
    20             $1,500,000)
    21         (2)  SR 0031, Jacobs Creek Bridge over
    22             Branch of Jacobs Creek, Bullskin
    23             Township, Bridge Replacement                  290,000
    24             (Base Construction Allocation -
    25             $180,000)
    26             (Land Allocation - $35,000)
    27             (Design and Contingencies - $75,000)
    28         (3)  SR 0119, Memorial Bridge over
    29             Youghiogheny River, Connellsville
    30             Borough, Bridge Painting                      100,000
    19970S0186B0179                 - 158 -

     1             (Base Construction Allocation -
     2             $100,000)
     3         (4)  SR 0201, Furnace Run Bridge over
     4             Furnace Run, Franklin Township, Bridge
     5             Replacement                                   445,000
     6             (Base Construction Allocation -
     7             $245,000)
     8             (Land Allocation - $25,000)
     9             (Design and Contingencies - $175,000)
    10         (5)  SR 0711, Crawford Avenue Bridge over
    11             Youghiogheny River, Connellsville
    12             Borough, Bridge Painting                      100,000
    13             (Base Construction Allocation -
    14             $100,000)
    15         (6)  SR 0982, Jacobs Creek Bridge over
    16             Branch of Jacobs Creek, Bullskin
    17             Township, Bridge Replacement                  335,000
    18             (Base Construction Allocation -
    19             $225,000)
    20             (Land Allocation - $35,000)
    21             (Design and Contingencies - $75,000)
    22         (7)  SR 0982, Bridge over Mounts Creek,
    23             Bullskin Township, Bridge Painting            105,000
    24             (Base Construction Allocation -
    25             $105,000)
    26         (8)  SR 1051, Mounts Creek Bridge over
    27             Mounts Creek, Bullskin Township, Bridge
    28             Replacement                                   436,000
    29             (Base Construction Allocation -
    30             $236,000)
    19970S0186B0179                 - 159 -

     1             (Land Allocation - $25,000)
     2             (Design and Contingencies - $175,000)
     3         (9)  SR 3013, Browns Run Bridge over Browns
     4             Run, German Township, Bridge
     5             Replacement                                   631,000
     6             (Base Construction Allocation -
     7             $431,000)
     8             (Land Allocation - $25,000)
     9             (Design and Contingencies - $175,000)
    10         (10)  SR 3015, Muddy Run Bridge over Muddy
    11             Run, Georges Township, Bridge Painting         33,000
    12             (Base Construction Allocation -
    13             $33,000)
    14         (11)  SR 4038, Washington Run Bridge over
    15             Washington Run, Perry Township, Bridge
    16             Replacement                                   640,000
    17             (Base Construction Allocation -
    18             $440,000)
    19             (Land Allocation - $25,000)
    20             (Design and Contingencies - $175,000)
    21         (12)  SR 0381, SR 0381 over Stoney Run,
    22             Wharton Township, Bridge Replacement          663,000
    23             (Base Construction Allocation -
    24             $463,000)
    25             (Land Allocation - $50,000)
    26             (Design and Contingencies - $150,000)
    27         (13)  SR 0819, SR 0819 over Branch of
    28             Jacobs Creek, Lower Tyrone Township,
    29             Bridge Replacement                            240,000
    30             (Base Construction Allocation -
    19970S0186B0179                 - 160 -

     1             $125,000)
     2             (Land Allocation - $15,000)
     3             (Design and Contingencies - $100,000)
     4         (14)  SR 1021, SR 1021 over Breakneck Run,
     5             Bullskin Township, Bridge Replacement         650,000
     6             (Base Construction Allocation -
     7             $475,000)
     8             (Land Allocation - $50,000)
     9             (Design and Contingencies - $125,000)
    10         (15)  SR 1031, SR 1031 over Galley Run,
    11             Upper Tyrone Township, Bridge
    12             Replacement                                   475,000
    13             (Base Construction Allocation -
    14             $325,000)
    15             (Land Allocation - $25,000)
    16             (Design and Contingencies - $125,000)
    17         (16)  SR 1031, SR 1031 over Branch of
    18             Galley Run, Upper Tyrone Township,
    19             Bridge Replacement                            613,000
    20             (Base Construction Allocation -
    21             $413,000)
    22             (Land Allocation - $50,000)
    23             (Design and Contingencies - $150,000)
    24         (17)  SR 1044, SR 1044 over Branch of
    25             Mounts Creek, Bullskin Township, Bridge
    26             Replacement                                   350,000
    27             (Base Construction Allocation -
    28             $200,000)
    29             (Land Allocation - $25,000)
    30             (Design and Contingencies - $125,000)
    19970S0186B0179                 - 161 -

     1         (18)  SR 2003, SR 2003 over Chaney Run,
     2             Wharton Township, Bridge Replacement          290,000
     3             (Base Construction Allocation -
     4             $175,000)
     5             (Land Allocation - $15,000)
     6             (Design and Contingencies - $100,000)
     7         (19)  SR 3003, SR 3003 at Nicholson
     8             Township Border, Springhill Township,
     9             Bridge Replacement                          1,400,000
    10             (Base Construction Allocation -
    11             $1,125,000)
    12             (Land Allocation - $75,000)
    13             (Design and Contingencies - $200,000)
    14         (20)  SR 3003, SR 3003 over Georges Creek,
    15             Springhill Township, Bridge
    16             Replacement                                 1,450,000
    17             (Base Construction Allocation -
    18             $1,150,000)
    19             (Land Allocation - $75,000)
    20             (Design and Contingencies - $225,000)
    21         (21)  SR 3003, SR 3003 Nicholson Township
    22             over Georges Creek, Springhill
    23             Township, Bridge Replacement                1,200,000
    24             (Base Construction Allocation -
    25             $975,000)
    26             (Land Allocation - $50,000)
    27             (Design and Contingencies - $175,000)
    28         (22)  SR 3009, SR 3009 over Georges Creek,
    29             Springhill Township, Bridge
    30             Replacement                                   863,000
    19970S0186B0179                 - 162 -

     1             (Base Construction Allocation -
     2             $688,000)
     3             (Land Allocation - $25,000)
     4             (Design and Contingencies - $150,000)
     5         (23)  SR 3013, SR 3013 over Middle Run,
     6             German Township, Bridge Replacement           900,000
     7             (Base Construction Allocation -
     8             $650,000)
     9             (Land Allocation - $75,000)
    10             (Design and Contingencies - $175,000)
    11         (24)  SR 4027, SR 4027 over Little Redstone
    12             Creek, Jefferson Township, Bridge
    13             Replacement                                   538,000
    14             (Base Construction Allocation -
    15             $338,000)
    16             (Land Allocation - $50,000)
    17             (Design and Contingencies - $150,000)
    18         (25)  SR 4044, SR 4044 over Downers Run,
    19             Washington Township, Bridge
    20             Replacement                                   800,000
    21             (Base Construction Allocation -
    22             $575,000)
    23             (Land Allocation - $50,000)
    24             (Design and Contingencies - $175,000)
    25         (26)  SR 4046, SR 4046 over Lutz Run and
    26             Abandoned Railroad, Washington
    27             Township, Bridge Replacement                1,400,000
    28             (Base Construction Allocation -
    29             $1,075,000)
    30             (Land Allocation - $75,000)
    19970S0186B0179                 - 163 -

     1             (Design and Contingencies - $250,000)
     2  Section 31.  Forrest County.
     3     (a)  Local Bridges (Reserved)
     4     (b)  State Bridges
     5         (1)  SR 0227, SR 0227 over West Hickory
     6             Creek, Harmony Township, Bridge
     7             Replacement                                   480,000
     8             (Base Construction Allocation -
     9             $400,000)
    10             (Land Allocation - $20,000)
    11             (Design and Contingencies - $60,000)
    12         (2)  SR 3001, SR 3001 over Little Tionesta
    13             Creek, Tionesta Township, Bridge
    14             Replacement                                   400,000
    15             (Base Construction Allocation -
    16             $310,000)
    17             (Land Allocation - $10,000)
    18             (Design and Contingencies - $80,000)
    19         (3)  SR 3004, SR 3004 over Little Hickory
    20             Creek, Hickory Township, Bridge
    21             Replacement                                   390,000
    22             (Base Construction Allocation -
    23             $300,000)
    24             (Land Allocation - $30,000)
    25             (Design and Contingencies - $60,000)
    26         (4)  SR 3004, SR 3004 over Piney Run, Green
    27             Township, Bridge Replacement                  390,000
    28             (Base Construction Allocation -
    29             $300,000)
    30             (Land Allocation - $10,000)
    19970S0186B0179                 - 164 -

     1             (Design and Contingencies - $80,000)
     2  Section 32.  Franklin County.
     3     (a)  Local Bridges (Reserved)
     4     (b)  State Bridges
     5         (1)  SR 3012, Social Island Road Bridge
     6             over Conococheague Creek, Hamilton
     7             Township, Bridge Replacement                  786,000
     8             (Base Construction Allocation -
     9             $636,000)
    10             (Land Allocation - $95,000)
    11             (Design and Contingencies - $55,000)
    12         (2)  SR 4010, Edenville Road Bridge over
    13             Wilson Run, St. Thomas Township, Bridge
    14             Replacement                                   335,000
    15             (Base Construction Allocation -
    16             $225,000)
    17             (Land Allocation - $10,000)
    18             (Design and Contingencies - $100,000)
    19         (3)  SR 4009, over Wilson Run, St. Thomas
    20             Township, Bridge Replacement                  750,000
    21             (Base Construction Allocation -
    22             $500,000)
    23             (Land Allocation - $50,000)
    24             (Design and Contingencies - $200,000)
    25  Section 33.  (Reserved).
    26  Section 34.  Greene County.
    27     (a)  Local Bridges
    28         (1)  Morgan Township, County Bridge No.89
    29             over Browns Run, Bridge Replacement           286,000
    30             (Base Construction Allocation -
    19970S0186B0179                 - 165 -

     1             $166,000)
     2             (Land Allocation - $20,000)
     3             (Design and Contingencies - $100,000)
     4         (2)  Morgan Township, County Bridge No.90
     5             over Browns Run, Bridge Replacement           282,000
     6             (Base Construction Allocation -
     7             $162,000)
     8             (Land Allocation - $20,000)
     9             (Design and Contingencies - $100,000)
    10         (3)  Morgan Township, County Bridge No.91
    11             over Browns Run, Bridge Replacement           273,000
    12             (Base Construction Allocation -
    13             $153,000)
    14             (Land Allocation - $20,000)
    15             (Design and Contingencies - $100,000)
    16         (4)  Cumberland Township, T-517, County
    17             Bridge No.4, Ullery Road over Goose
    18             Run, Bridge Replacement                       360,000
    19             (Base Construction Allocation -
    20             $200,000)
    21             (Land Allocation - $10,000)
    22             (Design and Contingencies - $150,000)
    23         (5)  Cumberland Township, T-634, County
    24             Bridge No.15, Coal Hill Road over Muddy
    25             Creek, Bridge Replacement                     410,000
    26             (Base Construction Allocation -
    27             $240,000)
    28             (Land Allocation - $10,000)
    29             (Design and Contingencies - $160,000)
    30         (6)  Greene Township, T-411, County Bridge
    19970S0186B0179                 - 166 -

     1             No.20 over Whitely Creek, Bridge
     2             Replacement                                   490,000
     3             (Base Construction Allocation -
     4             $300,000)
     5             (Land Allocation - $15,000)
     6             (Design and Contingencies - $175,000)
     7         (7)  Gray Township, T-392, County Bridge
     8             No.63 over Grays Creek, Bridge
     9             Replacement                                   380,000
    10             (Base Construction Allocation -
    11             $220,000)
    12             (Land Allocation - $10,000)
    13             (Design and Contingencies - $150,000)
    14         (8)  Washington Township, T-550, County
    15             Bridge No.97 over Craynes Run, Bridge
    16             Replacement                                   360,000
    17             (Base Construction Allocation -
    18             $200,000)
    19             (Land Allocation - $10,000)
    20             (Design and Contingencies - $150,000)
    21         (9)  Morris Township, T-629, County Bridge
    22             No.73 over Bates Fork Creek, Bridge
    23             Replacement                                   490,000
    24             (Base Construction Allocation -
    25             $350,000)
    26             (Land Allocation - $15,000)
    27             (Design and Contingencies - $125,000)
    28         (10)  Cumberland Township, T-660, County
    29             Bridge No.13 over Muddy Creek, Bridge
    30             Replacement                                   565,000
    19970S0186B0179                 - 167 -

     1             (Base Construction Allocation -
     2             $400,000)
     3             (Land Allocation - 15,000)
     4             (Design and Contingencies - $150,000)
     5         (11)  Aleppo Township, T-304, County Bridge
     6             No.108 over Branch of Harts Run, Bridge
     7             Replacement                                   575,000
     8             (Base Construction Allocation -
     9             $425,000)
    10             (Land Allocation - $25,000)
    11             (Design and Contingencies - $125,000)
    12     (b)  State Bridges
    13         (1)  SR 0018, Bridge over South Fork of Ten
    14             Mile Creek, Franklin Township, Bridge
    15             Rehabilitation                                320,000
    16             (Base Construction Allocation -
    17             $280,000)
    18             (Design and Contingencies - $40,000)
    19         (2)  SR 0018, Bates Creek Bridge over Bates
    20             Fork and Browns Creeks, Washington
    21             Township, Bridge Replacement                  650,000
    22             (Base Construction Allocation -
    23             $450,000)
    24             (Land Allocation - $25,000)
    25             (Design and Contingencies - $175,000)
    26         (3)  SR 0021, Grinnage Run Bridge over
    27             Grinnage Run, Gray Township, Bridge
    28             Replacement                                   453,000
    29             (Base Construction Allocation -
    30             $253,000)
    19970S0186B0179                 - 168 -

     1             (Land Allocation - $25,000)
     2             (Design and Contingencies - $175,000)
     3         (4)  SR 0079, I-79 Bridge over T-631,
     4             Washington Township, Bridge
     5             Replacement                                   980,000
     6             (Base Construction Allocation -
     7             $740,000)
     8             (Land Allocation - $40,000)
     9             (Design and Contingencies - $200,000)
    10         (5)  SR 0079, I-79 Bridge over T-631,
    11             Washington Township, Bridge
    12             Rehabilitation                                945,000
    13             (Base Construction Allocation -
    14             $705,000)
    15             (Land Allocation - $40,000)
    16             (Design and Contingencies - $200,000)
    17         (6)  SR 0079, I-79 Bridge over PA 221,
    18             Washington Township, Bridge
    19             Replacement                                 2,074,000
    20             (Base Construction Allocation -
    21             $1,784,000)
    22             (Land Allocation - $40,000)
    23             (Design and Contingencies - $250,000)
    24         (7)  SR 0079, I-79 Bridge No.2 over PA 221,
    25             Washington Township, Bridge
    26             Replacement                                 2,074,000
    27             (Base Construction Allocation -
    28             $1,784,000)
    29             (Land Allocation - $40,000)
    30             (Design and Contingencies - $250,000)
    19970S0186B0179                 - 169 -

     1         (8)  SR 0079, I-79 Bridge over T-512,
     2             Washington Township, Bridge
     3             Rehabilitation                                980,000
     4             (Base Construction Allocation -
     5             $740,000)
     6             (Land Allocation - $40,000)
     7             (Design and Contingencies - $200,000)
     8         (9)  SR 0079, I-79 Bridge No.2 over T-512,
     9             Washington Township, Bridge
    10             Replacement                                 1,020,000
    11             (Base Construction Allocation -
    12             $780,000)
    13             (Land Allocation - $40,000)
    14             (Design and Contingencies - $200,000)
    15         (10)  SR 0088, Albert Gallatin Bridge over
    16             Monongahela River, Dunkard Township,
    17             Bridge Painting                             1,500,000
    18             (Base Construction Allocation -
    19             $1,500,000)
    20         (11)  SR 0088, Point Marion Bridge over
    21             Monongahela River, Dunkard Township,
    22             Bridge Replacement                          6,200,000
    23             (Base Construction Allocation -
    24             $5,500,000)
    25             (Land Allocation - $200,000)
    26             (Design and Contingencies - $500,000)
    27         (12)  SR 0218, Roberts Run Bridge No.2 over
    28             Roberts Run, Wayne Township, Bridge
    29             Replacement                                   768,000
    30             (Base Construction Allocation -
    19970S0186B0179                 - 170 -

     1             $568,000)
     2             (Land Allocation - $25,000)
     3             (Design and Contingencies - $175,000)
     4         (13)  SR 2003, Bridge over Branch of
     5             Dunkard Creek, Perry Township, Bridge
     6             Replacement                                   625,000
     7             (Base Construction Allocation -
     8             $400,000)
     9             (Land Allocation - $25,000)
    10             (Design and Contingencies - $200,000)
    11         (14)  SR 3007, Bridge over Branch of
    12             Wheeling Creek, Richill Township,
    13             Bridge Replacement                            375,000
    14             (Base Construction Allocation -
    15             $175,000)
    16             (Land Allocation - $25,000)
    17             (Design and Contingencies - $175,000)
    18  Section 35.  Huntingdon County.
    19     (a)  Local Bridges
    20         (1)  Mill Creek Borough, Main Street Bridge
    21             over Mill Creek, Bridge Rehabilitation         30,000
    22             (Base Construction Allocation -
    23             $30,000)
    24         (2)  Juniata Township, T-428, Corbin Bridge
    25             over Raystown Branch of Juniata River,
    26             Bridge Replacement                            920,000
    27             (Base Construction Allocation -
    28             $920,000)
    29         (3)  Springfield Township, T-313, Walnut
    30             Grove Bridge, County Bridge No.2 over
    19970S0186B0179                 - 171 -

     1             Sideling Hill Creek, Bridge
     2             Replacement                                   975,000
     3             (Base Construction Allocation -
     4             $800,000)
     5             (Land Allocation - $25,000)
     6             (Design and Contingencies - $150,000)
     7     (b)  State Bridges (Reserved)
     8  Section 36.  Indiana County.
     9     (a)  Local Bridges
    10         (1)  Banks Township, T-974, County Bridge
    11             No.13, Bear Run Bridge over Bear Run,
    12             Bridge Replacement                            500,000
    13             (Base Construction Allocation -
    14             $400,000)
    15             (Land Allocation - $20,000)
    16             (Design and Contingencies - $80,000)
    17         (2)  Blacklick Township, T-574, Muddy Run
    18             Bridge over Muddy Run, Bridge
    19             Replacement                                   380,000
    20             (Base Construction Allocation -
    21             $300,000)
    22             (Land Allocation - $10,000)
    23             (Design and Contingencies - $70,000)
    24         (3)  Cherryhill Township, T-686, County
    25             Bridge No.65, Grace Church Bridge over
    26             Two Lick Creek, Bridge Replacement            600,000
    27             (Base Construction Allocation -
    28             $500,000)
    29             (Land Allocation - $20,000)
    30             (Design and Contingencies - $80,000)
    19970S0186B0179                 - 172 -

     1         (4)  Cherryhill Township, T-978, Allen
     2             Bridge over Two Lick Reservoir, Bridge
     3             Rehabilitation                                264,000
     4             (Base Construction Allocation -
     5             $200,000)
     6             (Land Allocation - $10,000)
     7             (Design and Contingencies - $54,000)
     8         (5)  Rayne Township, T-760, County Bridge
     9             No.23-A, Chambersville Bridge over
    10             Crooked Creek, Bridge Rehabilitation          190,000
    11             (Base Construction Allocation -
    12             $150,000)
    13             (Land Allocation - $10,000)
    14             (Design and Contingencies - $30,000)
    15         (6)  Grant Township, T-820 over Crooked
    16             Run, Bridge Replacement                       245,000
    17             (Base Construction Allocation -
    18             $200,000)
    19             (Land Allocation - $10,000)
    20             (Design and Contingencies - $35,000)
    21     (b)  State Bridges
    22         (1)  SR 0022, Chestnut Ridge Bridge over SR
    23             0119, Burrell Township, Bridge
    24             Painting                                       90,000
    25             (Base Construction Allocation -
    26             $75,000)
    27             (Design and Contingencies - $15,000)
    28         (2)  SR 0022, Armagh Bridge over SR 0056,
    29             West Wheatfield Township, Bridge
    30             Painting                                      145,000
    19970S0186B0179                 - 173 -

     1             (Base Construction Allocation -
     2             $130,000)
     3             (Design and Contingencies - $15,000)
     4         (3)  SR 0119, Blacklick Bridge over
     5             Blacklick Creek, Burrell Township,
     6             Bridge Painting                               280,000
     7             (Base Construction Allocation -
     8             $265,000)
     9             (Design and Contingencies - $15,000)
    10         (4)  SR 0119, Bypass Steel Bridge No.1 over
    11             Wayne Avenue Ramps, White Township,
    12             Bridge Painting                               170,000
    13             (Base Construction Allocation -
    14             $155,000)
    15             (Design and Contingencies - $15,000)
    16         (5)  SR 0119, Bypass Steel Bridge No.2 over
    17             Wayne Avenue Ramps, White Township,
    18             Bridge Painting                               170,000
    19             (Base Construction Allocation -
    20             $155,000)
    21             (Design and Contingencies - $15,000)
    22         (6)  SR 0119, Bypass Steel Bridge No.3 over
    23             SR 0422, White Township, Bridge
    24             Painting                                      240,000
    25             (Base Construction Allocation -
    26             $225,000)
    27             (Design and Contingencies - $15,000)
    28         (7)  SR 0119, Bypass Steel Bridge No.4 over
    29             SR 0422, White Township, Bridge
    30             Painting                                      240,000
    19970S0186B0179                 - 174 -

     1             (Base Construction Allocation -
     2             $225,000)
     3             (Design and Contingencies - $15,000)
     4         (8)  SR 0119, Bypass Steel Bridge No.5 over
     5             SR 0954, White Township, Bridge
     6             Painting                                      195,000
     7             (Base Construction Allocation -
     8             $180,000)
     9             (Design and Contingencies - $15,000)
    10         (9)  SR 0119, Bypass Steel Bridge No.6 over
    11             SR 0954, White Township, Bridge
    12             Painting                                      175,000
    13             (Base Construction Allocation -
    14             $160,000)
    15             (Design and Contingencies - $15,000)
    16         (10)  SR 0119, Bypass Steel Bridge No.7
    17             over SR 0286, White Township, Bridge
    18             Painting                                      235,000
    19             (Base Construction Allocation -
    20             $220,000)
    21             (Design and Contingencies - $15,000)
    22         (11)  SR 0119, Bypass Steel Bridge No.8
    23             over SR 0286, White Township, Bridge
    24             Painting                                      215,000
    25             (Base Construction Allocation -
    26             $200,000)
    27             (Design and Contingencies - $15,000)
    28         (12)  SR 0119, Bypass Steel Bridge No.9
    29             over SR 1003, White Township, Bridge
    30             Painting                                      200,000
    19970S0186B0179                 - 175 -

     1             (Base Construction Allocation -
     2             $185,000)
     3             (Design and Contingencies - $15,000)
     4         (13)  SR 0119, Bypass Steel Bridge No.10
     5             over SR 1003, White Township, Bridge
     6             Painting                                      175,000
     7             (Base Construction Allocation -
     8             $160,000)
     9             (Design and Contingencies - $15,000)
    10         (14)  SR 0119, Bypass Steel Bridge No.11
    11             over SR 0110, White Township, Bridge
    12             Painting                                      125,000
    13             (Base Construction Allocation -
    14             $110,000)
    15             (Design and Contingencies - $15,000)
    16         (15)  SR 0119, Bypass Steel Bridge No.12
    17             over SR 0110, White Township, Bridge
    18             Painting                                      125,000
    19             (Base Construction Allocation -
    20             $110,000)
    21             (Design and Contingencies - $15,000)
    22         (16)  SR 0217, Torrance Bridge over
    23             Conemaugh River, Burrell Township,
    24             Bridge Painting                               435,000
    25             (Base Construction Allocation -
    26             $420,000)
    27             (Design and Contingencies - $15,000)
    28         (17)  SR 0217, Blacklick Creek Bridge over
    29             Blacklick Creek, Burrell Township,
    30             Bridge Painting                               400,000
    19970S0186B0179                 - 176 -

     1             (Base Construction Allocation -
     2             $385,000)
     3             (Design and Contingencies - $15,000)
     4         (18)  SR 0259, Heshbon Bridge over
     5             Blacklick Creek, West Wheatfield
     6             Township, Bridge Painting                     200,000
     7             (Base Construction Allocation -
     8             $185,000)
     9             (Design and Contingencies - $15,000)
    10         (19)  SR 0286, Clymer Bridge over Twolick
    11             Creek, Clymer Borough, Bridge Painting        175,000
    12             (Base Construction Allocation -
    13             $160,000)
    14             (Design and Contingencies - $15,000)
    15         (20)  SR 0422, Twolick Eastbound Bridge
    16             over Twolick Creek, White Township,
    17             Bridge Painting                               360,000
    18             (Base Construction Allocation -
    19             $345,000)
    20             (Design and Contingencies - $15,000)
    21         (21)  SR 0422, Twolick Westbound Bridge
    22             over Twolick Creek, White Township,
    23             Bridge Painting                               360,000
    24             (Base Construction Allocation -
    25             $345,000)
    26             (Design and Contingencies - $15,000)
    27         (22)  SR 0422, Penn Run Exit Bridge
    28             Eastbound over TR 840, White Township,
    29             Bridge Painting                               190,000
    30             (Base Construction Allocation -
    19970S0186B0179                 - 177 -

     1             $175,000)
     2             (Design and Contingencies - $15,000)
     3         (23)  SR 0422, Penn Run Exit Bridge
     4             Westbound over TR 840, White Township,
     5             Bridge Painting                               190,000
     6             (Base Construction Allocation -
     7             $175,000)
     8             (Design and Contingencies - $15,000)
     9         (24)  SR 0580, Cush Cushion Creek Bridge
    10             over Cush Cushion Creek, Green
    11             Township, Bridge Painting                      85,000
    12             (Base Construction Allocation -
    13             $70,000)
    14             (Design and Contingencies - $15,000)
    15         (25)  SR 0954, Yellow Creek Bridge over
    16             Yellow Creek, White Township, Bridge
    17             Painting                                      125,000
    18             (Base Construction Allocation -
    19             $110,000)
    20             (Design and Contingencies - $15,000)
    21         (26)  SR 0954, Creekside Bridge over
    22             Crooked Creek, White Township, Bridge
    23             Painting                                      125,000
    24             (Base Construction Allocation -
    25             $110,000)
    26             (Design and Contingencies - $15,000)
    27         (27)  SR 0954, South Branch Bridge over
    28             South Branch of Plum Creek, Washington
    29             Township, Bridge Painting                      75,000
    30             (Base Construction Allocation -
    19970S0186B0179                 - 178 -

     1             $60,000)
     2             (Design and Contingencies - $15,000)
     3         (28)  SR 1004, Philadelphia Street Exit
     4             Bridge over SR 0119, White Township,
     5             Bridge Painting                               235,000
     6             (Base Construction Allocation -
     7             $220,000)
     8             (Design and Contingencies - $15,000)
     9         (29)  SR 1006, Jimmy Stewart Airport Bridge
    10             over SR 0119, White Township, Bridge
    11             Painting                                      245,000
    12             (Base Construction Allocation -
    13             $230,000)
    14             (Design and Contingencies - $15,000)
    15         (30)  SR 1007, Tanoma Bridge over Crooked
    16             Creek, Rayne Township, Bridge Painting         75,000
    17             (Base Construction Allocation -
    18             $60,000)
    19             (Design and Contingencies - $15,000)
    20         (31)  SR 1014, Diamondville Bridge over
    21             North Branch of Twolick Creek, Green
    22             Township, Bridge Painting                      75,000
    23             (Base Construction Allocation -
    24             $60,000)
    25             (Design and Contingencies - $15,000)
    26         (32)  SR 1017, Pine Flats Bridge over South
    27             Branch of Twolick Creek, Green
    28             Township, Bridge Painting                      95,000
    29             (Base Construction Allocation -
    30             $80,000)
    19970S0186B0179                 - 179 -

     1             (Design and Contingencies - $15,000)
     2         (33)  SR 1033, Gypsy Bridge over Cush
     3             Creek, Montgomery Township, Bridge
     4             Painting                                       85,000
     5             (Base Construction Allocation -
     6             $70,000)
     7             (Design and Contingencies - $15,000)
     8         (34)  SR 1034, Lower Wilgus Bridge over
     9             Branch of Cush Creek, Montgomery
    10             Township, Bridge Painting                      55,000
    11             (Base Construction Allocation -
    12             $40,000)
    13             (Design and Contingencies - $15,000)
    14         (35)  SR 1038, Crooked Run Bridge over
    15             Crooked Run, East Mahoning Township,
    16             Bridge Painting                                60,000
    17             (Base Construction Allocation -
    18             $45,000)
    19             (Design and Contingencies - $15,000)
    20         (36)  SR 1045, Broadhead Run Bridge over
    21             Broadhead Run, Canoe Township, Bridge
    22             Painting                                       70,000
    23             (Base Construction Allocation -
    24             $55,000)
    25             (Design and Contingencies - $15,000)
    26         (37)  SR 1045, Juneau Bridge over Canoe
    27             Creek, Canoe Township, Bridge Painting         75,000
    28             (Base Construction Allocation -
    29             $60,000)
    30             (Design and Contingencies - $15,000)
    19970S0186B0179                 - 180 -

     1         (38)  SR 1046, Straight Run Bridge over
     2             Straight Run, Banks Township, Bridge
     3             Painting                                       80,000
     4             (Base Construction Allocation -
     5             $65,000)
     6             (Design and Contingencies - $15,000)
     7         (39)  SR 2019, Tearing Run Bridge No.1 over
     8             Tearing Run, Center Township, Bridge
     9             Painting                                       55,000
    10             (Base Construction Allocation -
    11             $40,000)
    12             (Design and Contingencies - $15,000)
    13         (40)  SR 2019, Tearing Run Bridge No.2 over
    14             Tearing Run, Center Township, Bridge
    15             Painting                                       65,000
    16             (Base Construction Allocation -
    17             $50,000)
    18             (Design and Contingencies - $15,000)
    19         (41)  SR 3003, Tunnelton Bridge over
    20             Conemaugh River, Conemaugh Township,
    21             Bridge Painting                               525,000
    22             (Base Construction Allocation -
    23             $510,000)
    24             (Design and Contingencies - $15,000)
    25         (42)  SR 3007, Clarksburg Bridge over
    26             Blacklegs Creek, Conemaugh Township,
    27             Bridge Painting                               105,000
    28             (Base Construction Allocation -
    29             $90,000)
    30             (Design and Contingencies - $15,000)
    19970S0186B0179                 - 181 -

     1         (43)  SR 3011, Blacklick Creek Bridge No.1
     2             over Blacklick Creek, Brush Valley
     3             Township, Bridge Painting                     405,000
     4             (Base Construction Allocation -
     5             $390,000)
     6             (Design and Contingencies - $15,000)
     7         (44)  SR 3011, Blacklick Creek Bridge No.2
     8             over Blacklick Creek, Blacklick
     9             Township, Bridge Painting                     405,000
    10             (Base Construction Allocation -
    11             $390,000)
    12             (Design and Contingencies - $15,000)
    13         (45)  SR 3013, Muddy Run Bridge over Muddy
    14             Run, Blacklick Township, Bridge
    15             Painting                                       65,000
    16             (Base Construction Allocation -
    17             $50,000)
    18             (Design and Contingencies - $15,000)
    19         (46)  SR 3016, Homer City Bridge over
    20             Twolick Creek, Homer City Borough,
    21             Bridge Painting                               125,000
    22             (Base Construction Allocation -
    23             $110,000)
    24             (Design and Contingencies - $15,000)
    25         (47)  SR 3031, Blacklegs Run Bridge over
    26             Blacklegs Run, Young Township, Bridge
    27             Painting                                       65,000
    28             (Base Construction Allocation -
    29             $50,000)
    30             (Design and Contingencies - $15,000)
    19970S0186B0179                 - 182 -

     1         (48)  SR 3037, Walker Run Bridge over
     2             Walker Run, Armstrong Township, Bridge
     3             Painting                                       55,000
     4             (Base Construction Allocation -
     5             $40,000)
     6             (Design and Contingencies - $15,000)
     7         (49)  SR 3039, Anthony Run Bridge over
     8             Anthony Run, Armstrong Township, Bridge
     9             Painting                                       55,000
    10             (Base Construction Allocation -
    11             $40,000)
    12             (Design and Contingencies - $15,000)
    13         (50)  SR 4001, Fisher Siding Bridge over
    14             Crooked Creek, Armstrong Township,
    15             Bridge Painting                               110,000
    16             (Base Construction Allocation -
    17             $95,000)
    18             (Design and Contingencies - $15,000)
    19         (51)  SR 4001, Five Points Bridge over
    20             South Branch of Plum Creek, Washington
    21             Township, Bridge Painting                     100,000
    22             (Base Construction Allocation -
    23             $85,000)
    24             (Design and Contingencies - $15,000)
    25         (52)  SR 4006, Reddings Run Bridge over
    26             Reddings Run, Washington Township,
    27             Bridge Painting                                55,000
    28             (Base Construction Allocation -
    29             $40,000)
    30             (Design and Contingencies - $15,000)
    19970S0186B0179                 - 183 -

     1         (53)  SR 4008, Kimmel Station Bridge No.1
     2             over Branch of Crooked Creek, Rayne
     3             Township, Bridge Painting                      50,000
     4             (Base Construction Allocation -
     5             $35,000)
     6             (Design and Contingencies - $15,000)
     7         (54)  SR 4008, Kimmel Station Bridge No.2
     8             over Branch of Crooked Creek, Rayne
     9             Township, Bridge Painting                      50,000
    10             (Base Construction Allocation -
    11             $35,000)
    12             (Design and Contingencies - $15,000)
    13         (55)  SR 4035, Plumville Bridge over Plum
    14             Creek, Plumville Borough, Bridge
    15             Painting                                       75,000
    16             (Base Construction Allocation -
    17             $60,000)
    18             (Design and Contingencies - $15,000)
    19         (56)  SR 0056, Seward Conrail Overpass,
    20             East Wheatfield Township, Bridge
    21             Replacement                                 2,570,000
    22             (Base Construction Allocation -
    23             $2,080,000)
    24             (Land Allocation - $150,000)
    25             (Design and Contingencies - $340,000)
    26  Section 37.  Jefferson County.
    27     (a)  Local Bridges
    28         (1)  Summerville Borough, County Bridge 40-
    29             A, Anderson Road Bridge over Runaway
    30             Run, Bridge Rehabilitation                    415,000
    19970S0186B0179                 - 184 -

     1             (Base Construction Allocation -
     2             $345,000)
     3             (Land Allocation - $10,000)
     4             (Design and Contingencies - $60,000)
     5         (2)  Sykesville Borough, Station Street
     6             Bridge over Stump Creek, Bridge
     7             Replacement                                   570,000
     8             (Base Construction Allocation -
     9             $500,000)
    10             (Land Allocation - $10,000)
    11             (Design and Contingencies - $60,000)
    12         (3)  Eldred Township, T-346 over Mill
    13             Creek, Bridge Replacement                     420,000
    14             (Base Construction Allocation -
    15             $330,000)
    16             (Land Allocation - $10,000)
    17             (Design and Contingencies - $80,000)
    18         (4)  Eldred Township, T-353 over Mill Run,
    19             Bridge Replacement                            245,000
    20             (Base Construction Allocation -
    21             $200,000)
    22             (Land Allocation - $10,000)
    23             (Design and Contingencies - $35,000)
    24         (5)  Oliver Township, T-718 over Little
    25             Sandy Creek, Bridge Replacement               490,000
    26             (Base Construction Allocation -
    27             $400,000)
    28             (Land Allocation - $10,000)
    29             (Design and Contingencies - $80,000)
    30         (6)  Union Township, T-320 over Little Mill
    19970S0186B0179                 - 185 -

     1             Creek, Bridge Replacement                     245,000
     2             (Base Construction Allocation -
     3             $200,000)
     4             (Land Allocation - $10,000)
     5             (Design and Contingencies - $35,000)
     6         (7)  Union Township, T-321 over Runaway
     7             Run, Bridge Replacement                       145,000
     8             (Base Construction Allocation -
     9             $100,000)
    10             (Land Allocation - $5,000)
    11             (Design and Contingencies - $40,000)
    12         (8)  Young Township, T-632 over Saw Mill
    13             Run, Bridge Replacement                       310,000
    14             (Base Construction Allocation -
    15             $250,000)
    16             (Land Allocation - $10,000)
    17             (Design and Contingencies - $50,000)
    18     (b)  State Bridges
    19         (1)  SR 3033, T-830, Knox No.1 Bridge over
    20             Swamp Run, Knox Township, Bridge
    21             Replacement                                   446,000
    22             (Base Construction Allocation -
    23             $376,000)
    24             (Land Allocation - $10,000)
    25             (Design and Contingencies - $60,000)
    26         (2)  SR 0036, Sawmill Run Bridge over
    27             Sawmill Run, Punxsutawney Borough,
    28             Bridge Painting                                60,000
    29             (Base Construction Allocation -
    30             $45,000)
    19970S0186B0179                 - 186 -

     1             (Design and Contingencies - $15,000)
     2         (3)  SR 0119, Punxsutawney Bridge over
     3             Mahoning Creek, Punxsutawney Borough,
     4             Bridge Painting                               250,000
     5             (Base Construction Allocation -
     6             $235,000)
     7             (Design and Contingencies - $15,000)
     8         (4)  SR 0410, Beaver Run Bridge over Beaver
     9             Run, Henderson Township, Bridge
    10             Painting                                       55,000
    11             (Base Construction Allocation -
    12             $40,000)
    13             (Design and Contingencies - $15,000)
    14         (5)  SR 0830, Falls Creek Bridge over Falls
    15             Creek, Falls Creek Township, Bridge
    16             Painting                                       80,000
    17             (Base Construction Allocation -
    18             $65,000)
    19             (Design and Contingencies - $15,000)
    20         (6)  SR 0949, Corsica Exit Bridge over I-
    21             80, Union Township, Bridge Painting           205,000
    22             (Base Construction Allocation -
    23             $190,000)
    24             (Design and Contingencies - $15,000)
    25         (7)  SR 1009, Kyle's Run Bridge over Kyle's
    26             Run, Washington Township, Bridge
    27             Painting                                       60,000
    28             (Base Construction Allocation -
    29             $45,000)
    30             (Design and Contingencies - $15,000)
    19970S0186B0179                 - 187 -

     1         (8)  SR 1027, Egypt Bridge over North Fork
     2             Creek, Rock Township, Bridge Painting         125,000
     3             (Base Construction Allocation -
     4             $110,000)
     5             (Design and Contingencies - $15,000)
     6         (9)  SR 2007, Clover Run Bridge over Clover
     7             Run, Gaskill Township, Bridge Painting         95,000
     8             (Base Construction Allocation -
     9             $80,000)
    10             (Design and Contingencies - $15,000)
    11         (10)  SR 2008, Stump Creek Bridge over
    12             Stump Creek, Henderson Township, Bridge
    13             Painting                                      100,000
    14             (Base Construction Allocation -
    15             $85,000)
    16             (Design and Contingencies - $15,000)
    17         (11)  SR 2023, Anita Bridge over Elk Run,
    18             McCalmont Township, Bridge Painting            60,000
    19             (Base Construction Allocation -
    20             $45,000)
    21             (Design and Contingencies - $15,000)
    22         (12)  SR 2023, Charcoal Plant Bridge over
    23             Sandy Lick Creek, Pine Creek Township,
    24             Bridge Painting                               125,000
    25             (Base Construction Allocation -
    26             $110,000)
    27             (Design and Contingencies - $15,000)
    28         (13)  SR 3003, Baxter Bridge over Redbank
    29             Creek, Clover Township, Bridge
    30             Painting                                      235,000
    19970S0186B0179                 - 188 -

     1             (Base Construction Allocation -
     2             $220,000)
     3             (Design and Contingencies - $15,000)
     4         (14)  SR 4006, North Fork Creek Bridge over
     5             North Fork Creek, Warsaw Township,
     6             Bridge Painting                               110,000
     7             (Base Construction Allocation -
     8             $95,000)
     9             (Design and Contingencies - $15,000)
    10         (15)  SR 0310, Bridge over Branch of Trout
    11             Run, Winslow Township, Bridge
    12             Replacement                                   490,000
    13             (Base Construction Allocation -
    14             $350,000)
    15             (Land Allocation - $20,000)
    16             (Design and Contingencies - $120,000)
    17         (16)  SR 3018, Bridge over Little Sandy
    18             Creek, Limestone Township, Bridge
    19             Replacement                                   670,000
    20             (Base Construction Allocation -
    21             $500,000)
    22             (Land Allocation - $20,000)
    23             (Design and Contingencies - $150,000)
    24  Section 38.  Juniata County.
    25     (a)  Local Bridges
    26         (1)  Fayette Township, T-558 over West
    27             Branch of Cocolamus Creek, Bridge
    28             Rehabilitation                                 21,000
    29             (Base Construction Allocation -
    30             $18,000)
    19970S0186B0179                 - 189 -

     1             (Design and Contingencies - $3,000)
     2         (2)  Fayette Township, T-602 over Little
     3             Lost Creek, Bridge Rehabilitation              19,000
     4             (Base Construction Allocation -
     5             $17,000)
     6             (Design and Contingencies - $2,000)
     7     (b)  State Bridges
     8         (1)  SR 0850, Laurel Run Bridge over Laurel
     9             Run, Village of Honey Grove, Tuscarora
    10             Township, Bridge Replacement                  670,000
    11             (Base Construction Allocation -
    12             $500,000)
    13             (Land Allocation - $20,000)
    14             (Design and Contingencies - $150,000)
    15         (2)  SR 0850, Bridge over Tuscarora Creek,
    16             Tuscarora Township, Bridge
    17             Rehabilitation                                155,000
    18             (Base Construction Allocation -
    19             $150,000)
    20             (Design and Contingencies - $5,000)
    21         (3)  SR 0850, Bridge over Tuscarora Creek,
    22             Tuscarora Township, Bridge Replacement      1,420,000
    23             (Base Construction Allocation -
    24             $1,280,000)
    25             (Land Allocation - $40,000)
    26             (Design and Contingencies - $100,000)
    27  Section 39.  Lackawanna County.
    28     (a)  Local Bridges
    29         (1)  Mayfield Borough, Poplar Street Bridge
    30             No.1 at Junction of South Washington
    19970S0186B0179                 - 190 -

     1             Avenue, Bridge Rehabilitation                 150,000
     2             (Base Construction Allocation -
     3             $130,000)
     4             (Design and Contingencies - $20,000)
     5     (b)  State Bridges
     6         (1)  SR 1016, Hill Street Bridge over
     7             Lackawanna River, Jessup and Blakely
     8             Boroughs, Bridge Deck Rehabilitation          890,000
     9             (Base Construction Allocation -
    10             $800,000)
    11             (Land Allocation - $10,000)
    12             (Design and Contingencies - $80,000)
    13         (2)  SR 3011, Keyser Avenue Bridge over
    14             Lindy Creek, City of Scranton, Bridge
    15             Replacement                                   185,000
    16             (Base Construction Allocation -
    17             $100,000)
    18             (Land Allocation - $10,000)
    19             (Design and Contingencies - $75,000)
    20         (3)  SR 0171, Bridge over Elk Creek at
    21             Junction of SR 1011, Fell Township,
    22             Bridge Replacement                            660,000
    23             (Base Construction Allocation -
    24             $520,000)
    25             (Land Allocation - $10,000)
    26             (Design and Contingencies - $130,000)
    27         (4)  SR 0247, Bridge over South Branch of
    28             Tunkhannock Creek, North of TR 438,
    29             Scott Township, Bridge Replacement            426,000
    30             (Base Construction Allocation -
    19970S0186B0179                 - 191 -

     1             $330,000)
     2             (Land Allocation - $10,000)
     3             (Design and Contingencies - $86,000)
     4         (5)  SR 2003, Bridge over Wallenpaupack
     5             Creek, North of TR 348, Jefferson
     6             Township, Bridge Replacement                  355,000
     7             (Base Construction Allocation -
     8             $275,000)
     9             (Land Allocation - $10,000)
    10             (Design and Contingencies - $70,000)
    11         (6)  SR 3013, Main Street Bridge, Old Forge
    12             Borough, Bridge Painting                      660,000
    13             (Base Construction Allocation -
    14             $600,000)
    15             (Design and Contingencies - $60,000)
    16         (7)  State Bridges, Countywide Bridge Zone
    17             Painting, Bridge Painting                     370,000
    18             (Base Construction Allocation -
    19             $350,000)
    20             (Land Allocation - $10,000)
    21             (Design and Contingencies - $10,000)
    22         (8)  SR 1013, Bridge over Elm Brook, 0.7
    23             Mile North of SR 1006, Scott Township,
    24             Bridge Replacement                            240,000
    25             (Base Construction Allocation -
    26             $200,000)
    27             (Land Allocation - $10,000)
    28             (Design and Contingencies - $30,000)
    29  Section 40.  Lancaster County.
    30     (a)  Local Bridges
    19970S0186B0179                 - 192 -

     1         (1)  Manor Township, T-599, West Roseville
     2             Road Bridge over Little Conestoga
     3             Creek, Bridge Replacement                     375,000
     4             (Base Construction Allocation -
     5             $286,000)
     6             (Land Allocation - $10,000)
     7             (Design and Contingencies - $150,000)
     8         (2)  Mt. Joy Township, T-350, Risser Mill
     9             Bridge over Tributary of Little
    10             Chickies Creek, Bridge Rehabilitation         550,000
    11             (Base Construction Allocation -
    12             $400,000)
    13             (Design and Contingencies - $150,000)
    14         (3)  Pequea Township, Silver Mine Road at
    15             Burnt Mills, Bridge Replacement               100,000
    16             (Base Construction Allocation -
    17             $90,000)
    18             (Design and Contingencies - $10,000)
    19     (b)  State Bridges
    20         (1)  SR 1024, Bridge over Little Cocalico
    21             Creek, East Cocalico Township, Bridge
    22             Replacement                                   675,000
    23             (Base Construction Allocation -
    24             $550,000)
    25             (Land Allocation - $25,000)
    26             (Design and Contingencies - $100,000)
    27  Section 41.  Lawrence County.
    28     (a)  Local Bridges
    29         (1)  City of New Castle, Willard Avenue
    30             Bridge over Tributary of Shenango
    19970S0186B0179                 - 193 -

     1             River, Bridge Replacement                     210,000
     2             (Base Construction Allocation -
     3             $150,000)
     4             (Land Allocation - $20,000)
     5             (Design and Contingencies - $40,000)
     6         (2)  Wampum Borough, Main Street Bridge
     7             over Eckles Run, Bridge Rehabilitation        190,000
     8             (Base Construction Allocation -
     9             $150,000)
    10             (Design and Contingencies - $40,000)
    11     (b)  State Bridges
    12         (1)  SR 0018, Mahoning Avenue Viaduct over
    13             Shenango River and Railroad, City of
    14             New Castle, Bridge Replacement              9,320,000
    15             (Base Construction Allocation -
    16             $9,000,000)
    17             (Land Allocation - $20,000)
    18             (Design and Contingencies - $300,000)
    19         (2)  SR 0018, Liberty Street Bridge over
    20             Hickory Run, New Castle City, Bridge
    21             Rehabilitation                                450,000
    22             (Base Construction Allocation -
    23             $300,000)
    24             (Land Allocation - $50,000)
    25             (Design and Contingencies - $100,000)
    26         (3)  SR 0060, SR 0060 Southbound over SR
    27             4004, Neshannock Township, Bridge
    28             Replacement                                   350,000
    29             (Base Construction Allocation -
    30             $200,000)
    19970S0186B0179                 - 194 -

     1             (Land Allocation - $50,000)
     2             (Design and Contingencies - $100,000)
     3         (4)  SR 0065, Ellwood Road Bridge over B&O
     4             Railroad, Shenango Township, Bridge
     5             Replacement                                   400,000
     6             (Base Construction Allocation -
     7             $250,000)
     8             (Land Allocation - $50,000)
     9             (Design and Contingencies - $100,000)
    10         (5)  SR 0488, Portersville Road Bridge over
    11             Morrison Run, Perry Township, Bridge
    12             Replacement                                   250,000
    13             (Base Construction Allocation -
    14             $100,000)
    15             (Land Allocation - $50,000)
    16             (Design and Contingencies - $100,000)
    17         (6)  SR 0488, Portersville Road Bridge over
    18             Morrison Run, Perry Township, Bridge
    19             Replacement                                   250,000
    20             (Base Construction Allocation -
    21             $100,000)
    22             (Land Allocation - $50,000)
    23             (Design and Contingencies - $100,000)
    24         (7)  SR 3001, South Main Street Bridge over
    25             Bessemer Haul Road, Bessemer Borough,
    26             Bridge Rehabilitation                         950,000
    27             (Base Construction Allocation -
    28             $800,000)
    29             (Design and Contingencies - $150,000)
    30         (8)  SR 4004, Union and Neshannock
    19970S0186B0179                 - 195 -

     1             Townships, Bridge Rehabilitation              800,000
     2             (Base Construction Allocation -
     3             $700,000)
     4             (Design and Contingencies - $100,000)
     5         (9)  SR 0060, Beaver Valley Expansion
     6             Bridge over SR 4005, Neshannock
     7             Township, Bridge Rehabilitation               650,000
     8             (Base Construction Allocation -
     9             $500,000)
    10             (Design and Contingencies - $150,000)
    11         (10)  SR 0060, Beaver Valley Extension
    12             Bridge over SR 4005, Neshannock
    13             Township, Bridge Rehabilitation               127,000
    14             (Base Construction Allocation -
    15             $116,000)
    16             (Design and Contingencies - $11,000)
    17         (11)  SR 0081, US 224 State Street Bridge
    18             over SR 0422 and Ramp K, Union
    19             Township, Bridge Rehabilitation               706,000
    20             (Base Construction Allocation -
    21             $644,000)
    22             (Design and Contingencies - $62,000)
    23         (12)  SR 0422, Westbound Bridge over Beaver
    24             River, Railroad and Local Street,
    25             Taylor Township, Bridge Rehabilitation      6,841,000
    26             (Base Construction Allocation -
    27             $6,741,000)
    28             (Design and Contingencies - $100,000)
    29         (13)  SR 0422, Eastbound Bridge over Beaver
    30             River, Railroad and Local Street,
    19970S0186B0179                 - 196 -

     1             Taylor Township, Bridge Replacement         6,963,000
     2             (Base Construction Allocation -
     3             $6,863,000)
     4             (Design and Contingencies - $100,000)
     5         (14)  SR 0422, Bridge over Business US 422,
     6             Union Township, Bridge Rehabilitation       1,379,000
     7             (Base Construction Allocation -
     8             $1,254,000)
     9             (Design and Contingencies - $125,000)
    10         (15)  SR 0422, Ben Franklin Highway Bridge
    11             over Business US 422, Union Township,
    12             Bridge Rehabilitation                         436,000
    13             (Base Construction Allocation -
    14             $398,000)
    15             (Design and Contingencies - $38,000)
    16         (16)  SR 0551, Main Street Bridge over
    17             Beaver Creek, Little Beaver Township,
    18             Bridge Replacement                            624,000
    19             (Base Construction Allocation -
    20             $524,000)
    21             (Design and Contingencies - $100,000)
    22         (17)  SR 2020, Pleasant Road Bridge over
    23             Camp Run, Perry Township, Bridge
    24             Replacement                                   400,000
    25             (Base Construction Allocation -
    26             $300,000)
    27             (Design and Contingencies - $100,000)
    28         (18)  SR 3002, Beaver Dam Road Bridge over
    29             Honey Creek, Little Beaver Township,
    30             Bridge Painting                                30,000
    19970S0186B0179                 - 197 -

     1             (Base Construction Allocation -
     2             $25,000)
     3             (Design and Contingencies - $5,000)
     4         (19)  SR 3004, Wallace Road Bridge over
     5             Sugar Creek, North Beaver Township,
     6             Bridge Replacement                            130,000
     7             (Base Construction Allocation -
     8             $120,000)
     9             (Design and Contingencies - $10,000)
    10         (20)  SR 3004, Wallace Road Bridge over
    11             Branch of Honey Creek, North Beaver
    12             Township, Bridge Painting                      30,000
    13             (Base Construction Allocation -
    14             $25,000)
    15             (Design and Contingencies - $5,000)
    16         (21)  SR 3004, Wallace Road Bridge over
    17             Branch of Honey Creek, North Beaver
    18             Township, Bridge Painting                     325,000
    19             (Base Construction Allocation -
    20             $300,000)
    21             (Design and Contingencies - $25,000)
    22         (22)  SR 4006, Coffee Run Bridge over
    23             Coffee Run, Mahoning Township, Bridge
    24             Replacement                                   335,000
    25             (Base Construction Allocation -
    26             $270,000)
    27             (Land Allocation - $15,000)
    28             (Design and Contingencies - $50,000)
    29  Section 42.  Lebanon County.
    30     (a)  Local Bridges
    19970S0186B0179                 - 198 -

     1         (1)  Union Township, T-617, Green Point
     2             School House Bridge over Trout Run,
     3             Bridge Replacement                            255,000
     4             (Base Construction Allocation -
     5             $170,000)
     6             (Land Allocation - $10,000)
     7             (Design and Contingencies - $75,000)
     8         (2)  Bethel Township, Market Drive, T-545
     9             over Beach Run, Bridge Replacement             30,000
    10             (Base Construction Allocation -
    11             $20,000)
    12             (Design and Contingencies - $10,000)
    13         (3)  South Londonderry Township, Patrick
    14             Road, T-331 over Tributary of Little
    15             Conewago Creek, Bridge Rehabilitation           5,000
    16             (Base Construction Allocation - $4,000)
    17             (Design and Contingencies - $1,000)
    18         (4)  South Londonderry Township, Eckert
    19             Road, T-304 over Little Conewago Creek,
    20             Bridge Rehabilitation                           5,000
    21             (Base Construction Allocation - $4,000)
    22             (Design and Contingencies - $1,000)
    23         (5)  South Londonderry Township, Risser
    24             Road, T-300 over Conewago Creek, Bridge
    25             Rehabilitation                                  4,000
    26             (Base Construction Allocation - $3,000)
    27             (Design and Contingencies - $1,000)
    28         (6)  South Londonderry Township, Long Road,
    29             T-304 over Tributary of Conewago Creek,
    30             Bridge Rehabilitation                           4,000
    19970S0186B0179                 - 199 -

     1             (Base Construction Allocation - $3,000)
     2             (Design and Contingencies - $1,000)
     3         (7)  South Londonderry Township, Eckert
     4             Road, T-304 over Tributary of Little
     5             Conewago Creek, Bridge Rehabilitation           5,000
     6             (Base Construction Allocation - $4,000)
     7             (Design and Contingencies - $1,000)
     8         (8)  South Londonderry Township, Church
     9             Road, T-303 over Unnamed Creek, Bridge
    10             Rehabilitation                                  3,000
    11             (Base Construction Allocation - $2,000)
    12             (Design and Contingencies - $1,000)
    13         (9)  South Londonderry Township, Patrick
    14             Road, T-331 over Tributary of Little
    15             Conewago Creek, Bridge Rehabilitation           4,000
    16             (Base Construction Allocation - $3,000)
    17             (Design and Contingencies - $1,000)
    18         (10)  South Londonderry Township, Hinkle
    19             Road, T-433 over Killinger Creek,
    20             Bridge Rehabilitation                           4,000
    21             (Base Construction Allocation - $3,000)
    22             (Design and Contingencies - $1,000)
    23         (11)  South Londonderry Township, Brandt
    24             Road, T-346 over Killinger Creek,
    25             Bridge Rehabilitation                           3,000
    26             (Base Construction Allocation - $2,000)
    27             (Design and Contingencies - $1,000)
    28         (12)  Union Township, Green Point School
    29             House Road, T-617 over Trout Run,
    30             Bridge Replacement                             90,000
    19970S0186B0179                 - 200 -

     1             (Base Construction Allocation -
     2             $70,000)
     3             (Design and Contingencies - $20,000)
     4     (b)  State Bridges (Reserved)
     5  Section 43.  Lehigh County.
     6     (a)  Local Bridges (Reserved)
     7     (b)  State Bridges
     8         (1)  SR 4007, Schlicher's Bridge over
     9             Jordan Creek, North Whitehall Township,
    10             Bridge Replacement                            875,000
    11             (Base Construction Allocation -
    12             $560,000)
    13             (Land Allocation - $145,000)
    14             (Design and Contingencies - $170,000)
    15         (2)  SR 3011, Farmington Road over
    16             Tributary of Schaffer Run, Upper
    17             Macungie Township, Bridge
    18             Rehabilitation                                330,000
    19             (Base Construction Allocation -
    20             $175,000)
    21             (Land Allocation - $55,000)
    22             (Design and Contingencies - $100,000)
    23         (3)  SR 1027, Cold Springs Road over Spring
    24             Creek, Whitehall Township, Bridge
    25             Replacement                                 2,550,000
    26             (Base Construction Allocation -
    27             $1,640,000)
    28             (Land Allocation - $420,000)
    29             (Design and Contingencies - $490,000)
    30  Section 44.  Luzerne County.
    19970S0186B0179                 - 201 -

     1     (a)  Local Bridges
     2         (1)  Ashley Borough, Ashley Street Bridge,
     3             Bridge Removal                                260,000
     4             (Base Construction Allocation -
     5             $200,000)
     6             (Land Allocation - $5,000)
     7             (Design and Contingencies - $55,000)
     8         (2)  Franklin Township, T-784, Bridge over
     9             Sutton Creek, Bridge Replacement              320,000
    10             (Base Construction Allocation -
    11             $250,000)
    12             (Land Allocation - $15,000)
    13             (Design and Contingencies - $55,000)
    14         (3)  Black Creek Township, T-309 over Falls
    15             Run Creek, Bridge Replacement                 395,000
    16             (Base Construction Allocation -
    17             $265,000)
    18             (Land Allocation - $5,000)
    19             (Design and Contingencies - $125,000)
    20         (4)  Black Creek Township, T-314 over
    21             Branch of Black Creek, Bridge
    22             Replacement                                   440,000
    23             (Base Construction Allocation -
    24             $310,000)
    25             (Land Allocation - $5,000)
    26             (Design and Contingencies - $125,000)
    27         (5)  Butler Township, T-356 over Nescopeck
    28             Creek, Bridge Replacement                     405,000
    29             (Base Construction Allocation -
    30             $275,000)
    19970S0186B0179                 - 202 -

     1             (Land Allocation - $5,000)
     2             (Design and Contingencies - $125,000)
     3         (6)  City of Wilkes-Barre, Division Street
     4             over Solomon's Creek, Bridge
     5             Replacement                                   955,000
     6             (Base Construction Allocation -
     7             $800,000)
     8             (Land Allocation - $5,000)
     9             (Design and Contingencies - $150,000)
    10         (7)  Dallas Township, County Road No.12
    11             over Toby's Creek, Bridge Replacement         405,000
    12             (Base Construction Allocation -
    13             $275,000)
    14             (Land Allocation - $5,000)
    15             (Design and Contingencies - $125,000)
    16         (8)  Dennison Township, County Road No.41
    17             over Nescopeck Creek, Bridge
    18             Replacement                                   405,000
    19             (Base Construction Allocation -
    20             $275,000)
    21             (Land Allocation - $5,000)
    22             (Design and Contingencies - $125,000)
    23         (9)  Dorrance Township, County Road No.30
    24             over Wapwallopen Creek, Bridge
    25             Replacement                                   405,000
    26             (Base Construction Allocation -
    27             $275,000)
    28             (Land Allocation - $5,000)
    29             (Design and Contingencies - $125,000)
    30         (10)  Fairmount Township, T-563 over Maple
    19970S0186B0179                 - 203 -

     1             Run Creek, Bridge Replacement                 395,000
     2             (Base Construction Allocation -
     3             $265,000)
     4             (Land Allocation - $5,000)
     5             (Design and Contingencies - $125,000)
     6         (11)  Franklin Township, T-782 over Sutton
     7             Creek, Bridge Replacement                     405,000
     8             (Base Construction Allocation -
     9             $275,000)
    10             (Land Allocation - $5,000)
    11             (Design and Contingencies - $125,000)
    12         (12)  Hunlock Township, T-534 over Hunlock
    13             Creek, Bridge Replacement                     405,000
    14             (Base Construction Allocation -
    15             $275,000)
    16             (Land Allocation - $5,000)
    17             (Design and Contingencies - $125,000)
    18         (13)  Jackson Township, County Road No.16
    19             over Toby's Creek, Bridge Replacement         350,000
    20             (Base Construction Allocation -
    21             $225,000)
    22             (Land Allocation - $5,000)
    23             (Design and Contingencies - $120,000)
    24         (14)  Jackson Township, County Road No.16
    25             over Toby's Creek, Bridge Replacement         370,000
    26             (Base Construction Allocation -
    27             $240,000)
    28             (Land Allocation - $5,000)
    29             (Design and Contingencies - $125,000)
    30         (15)  Jackson Township, T-605 over Branch
    19970S0186B0179                 - 204 -

     1             of Harvey's Creek, Bridge Replacement         395,000
     2             (Base Construction Allocation -
     3             $265,000)
     4             (Land Allocation - $5,000)
     5             (Design and Contingencies - $125,000)
     6         (16)  Jackson Township, County Road No.13
     7             over Toby's Creek, Bridge Replacement         395,000
     8             (Base Construction Allocation -
     9             $265,000)
    10             (Land Allocation - $5,000)
    11             (Design and Contingencies - $125,000)
    12         (17)  Lake Township, T-796 over Beaver Run
    13             Creek, Bridge Replacement                     410,000
    14             (Base Construction Allocation -
    15             $280,000)
    16             (Land Allocation - $5,000)
    17             (Design and Contingencies - $125,000)
    18         (18)  Lake Township, T-779 over Bryant Pond
    19             Outlet, Bridge Replacement                    430,000
    20             (Base Construction Allocation -
    21             $300,000)
    22             (Land Allocation - $5,000)
    23             (Design and Contingencies - $125,000)
    24         (19)  Nescopeck Township, T-381 over Branch
    25             of Nescopeck Creek, Bridge Replacement        410,000
    26             (Base Construction Allocation -
    27             $280,000)
    28             (Land Allocation - $5,000)
    29             (Design and Contingencies - $125,000)
    30         (20)  Ross Township, T-680 over Huntingdon
    19970S0186B0179                 - 205 -

     1             Creek, Bridge Replacement                     410,000
     2             (Base Construction Allocation -
     3             $280,000)
     4             (Land Allocation - $5,000)
     5             (Design and Contingencies - $125,000)
     6         (21)  Ross Township, T-571 over Outlet
     7             North Pond, Bridge Replacement                420,000
     8             (Base Construction Allocation -
     9             $290,000)
    10             (Land Allocation - $5,000)
    11             (Design and Contingencies - $125,000)
    12         (22)  Ross Township, T-575 over Huntingdon
    13             Creek, Bridge Replacement                     455,000
    14             (Base Construction Allocation -
    15             $325,000)
    16             (Land Allocation - $5,000)
    17             (Design and Contingencies - $125,000)
    18         (23)  Ross Township, County Road No.2 over
    19             Marsh Creek, Bridge Replacement               440,000
    20             (Base Construction Allocation -
    21             $310,000)
    22             (Land Allocation - $5,000)
    23             (Design and Contingencies - $125,000)
    24         (24)  Sugarloaf Township, T-332 over Branch
    25             of Nescopeck Creek, Bridge Replacement        430,000
    26             (Base Construction Allocation -
    27             $300,000)
    28             (Land Allocation - $5,000)
    29             (Design and Contingencies - $125,000)
    30         (25)  Plymouth Township, T-497 over Mud
    19970S0186B0179                 - 206 -

     1             Pond Inlet, Bridge Replacement                405,000
     2             (Base Construction Allocation -
     3             $275,000)
     4         (26)  Slocum Township, T-454 over Black
     5             Creek, Bridge Replacement                     395,000
     6             (Base Construction Allocation -
     7             $265,000)
     8             (Land Allocation - $5,000)
     9             (Design and Contingencies - $125,000)
    10         (27)  Wright Township, County Road No.21
    11             over Wapwallopen Creek, Bridge
    12             Replacement                                   395,000
    13             (Base Construction Allocation -
    14             $265,000)
    15             (Land Allocation - $5,000)
    16             (Design and Contingencies - $125,000)
    17     (b)  State Bridges
    18         (1)  SR 0011, Erie-Lackawanna Railroad
    19             Bridge over Erie-Lackawanna Railroad,
    20             Plymouth Township, Bridge Removal             185,000
    21             (Base Construction Allocation -
    22             $150,000)
    23             (Land Allocation - $10,000)
    24             (Design and Contingencies - $25,000)
    25         (2)  SR 1030, Harvey's Lake Bridge at
    26             Junction of SR 1053, Lake Township,
    27             Bridge Replacement                            460,000
    28             (Base Construction Allocation -
    29             $350,000)
    30             (Land Allocation - $20,000)
    19970S0186B0179                 - 207 -

     1             (Design and Contingencies - $90,000)
     2         (3)  SR 3007, Bridge over Wapwallopen
     3             Creek, South of SR 3010, Dorrance
     4             Township, Bridge Replacement                  530,000
     5             (Base Construction Allocation -
     6             $420,000)
     7             (Land Allocation - $10,000)
     8             (Design and Contingencies - $100,000)
     9         (4)  State Bridges, Countywide Bridge Zone
    10             Painting, Bridge Painting                     370,000
    11             (Base Construction Allocation -
    12             $350,000)
    13             (Land Allocation - $10,000)
    14             (Design and Contingencies - $10,000)
    15  Section 45.  Lycoming County.
    16     (a)  Local Bridges
    17         (1)  Mifflin Township, T-651 over Larry's
    18             Creek, Bridge Replacement                     528,000
    19             (Base Construction Allocation -
    20             $438,000)
    21             (Land Allocation - $20,000)
    22             (Design and Contingencies - $70,000)
    23         (2)  McIntyre Township, T-667, Rolston
    24             Bridge over Lycoming Creek, Bridge
    25             Replacement                                 1,620,000
    26             (Base Construction Allocation -
    27             $1,400,000)
    28             (Land Allocation - $20,000)
    29             (Design and Contingencies - $200,000)
    30     (b)  State Bridges
    19970S0186B0179                 - 208 -

     1         (1)  SR 0220, Quenshukeny Run Bridge over
     2             Quenshukeny Run, Village of Linden,
     3             Bridge Replacement                            395,000
     4             (Base Construction Allocation -
     5             $316,000)
     6             (Land Allocation - $20,000)
     7             (Design and Contingencies - $59,000)
     8         (2)  SR 0973, Bridge over Hoagland Run, 3
     9             Miles West of Cogan Station, Bridge
    10             Rehabilitation                                195,000
    11             (Base Construction Allocation -
    12             $156,000)
    13             (Land Allocation - $10,000)
    14             (Design and Contingencies - $29,000)
    15         (3)  SR 1006, Wallis Run Bridge over Wallis
    16             Run, Cascade Township, Bridge
    17             Replacement                                    65,000
    18             (Base Construction Allocation -
    19             $50,000)
    20             (Land Allocation - $5,000)
    21             (Design and Contingencies - $10,000)
    22         (4)  SR 2022, Mill Creek Bridge, North of
    23             Montoursville, Bridge Replacement             668,000
    24             (Base Construction Allocation -
    25             $575,000)
    26             (Land Allocation - $43,000)
    27             (Design and Contingencies - $50,000)
    28         (5)  SR 2051, Wolf Run Bridge over Wolf
    29             Run, South of SR 0220, Muncy Township,
    30             Bridge Replacement                            638,000
    19970S0186B0179                 - 209 -

     1             (Base Construction Allocation -
     2             $510,000)
     3             (Land Allocation - $32,000)
     4             (Design and Contingencies - $96,000)
     5         (6)  SR 3024, Jobs Run Road Bridge over
     6             Tributary of Larrys Creek, East of
     7             Salladasburg, Bridge Replacement              108,000
     8             (Base Construction Allocation -
     9             $92,000)
    10             (Land Allocation - $8,000)
    11             (Design and Contingencies - $8,000)
    12         (7)  SR 3028, West 4th Street, Lycoming
    13             Creek Bridge, City of Williamsport,
    14             Bridge Rehabilitation                         216,000
    15             (Base Construction Allocation -
    16             $185,000)
    17             (Land Allocation - $15,000)
    18             (Design and Contingencies - $16,000)
    19         (8)  SR 0044, Bridge over Conrail, Bridge
    20             Painting                                      210,000
    21             (Base Construction Allocation -
    22             $200,000)
    23             (Design and Contingencies - $10,000)
    24         (9)  SR 0180, I-180 Eastbound Bridge over
    25             Loyalsock Creek, Bridge Painting              135,000
    26             (Base Construction Allocation -
    27             $125,000)
    28             (Design and Contingencies - $10,000)
    29         (10)  SR 0180, I-180 Westbound Bridge over
    30             Loyalsock Creek, Bridge Painting              135,000
    19970S0186B0179                 - 210 -

     1             (Base Construction Allocation -
     2             $125,000)
     3             (Design and Contingencies - $10,000)
     4         (11)  SR 2014, Bridge over Lycoming Creek,
     5             Bridge Painting                               780,000
     6             (Base Construction Allocation -
     7             $770,000)
     8             (Design and Contingencies - $10,000)
     9         (12)  SR 2061, Bridge over Little Muncy
    10             Creek, Bridge Painting                         80,000
    11             (Base Construction Allocation -
    12             $70,000)
    13             (Design and Contingencies - $10,000)
    14         (13)  SR 0014, SR 0014 over Trout Run,
    15             Lewis Township, Bridge Replacement            640,000
    16             (Base Construction Allocation -
    17             $512,000)
    18             (Land Allocation - $32,000)
    19             (Design and Contingencies - $96,000)
    20         (14)  SR 0044, SR 0044 over Ramsey Run,
    21             Cummings Township, Bridge Replacement         394,000
    22             (Base Construction Allocation -
    23             $315,000)
    24             (Land Allocation - $20,000)
    25             (Design and Contingencies - $59,000)
    26         (15)  SR 0044, SR 0044 over Pine Bottom
    27             Run, Cummings Township, Bridge
    28             Replacement                                   360,000
    29             (Base Construction Allocation -
    30             $288,000)
    19970S0186B0179                 - 211 -

     1             (Land Allocation - $18,000)
     2             (Design and Contingencies - $54,000)
     3         (16)  SR 0118, SR 0118 over Big Run,
     4             Franklin Township, Bridge Replacement         382,000
     5             (Base Construction Allocation -
     6             $307,000)
     7             (Land Allocation - $19,000)
     8             (Design and Contingencies - $56,000)
     9         (17)  SR 0284, SR 0284 over Blacks Creek,
    10             Pine Township, Bridge Replacement             700,000
    11             (Base Construction Allocation -
    12             $570,000)
    13             (Land Allocation - $30,000)
    14             (Design and Contingencies - $100,000)
    15         (18)  SR 0405, SR 0405 over West Branch of
    16             Susquehanna River, Muncy Creek
    17             Township, Bridge Replacement               24,924,000
    18             (Base Construction Allocation -
    19             $19,939,000)
    20             (Land Allocation - $1,246,000)
    21             (Design and Contingencies - $3,739,000)
    22         (19)  SR 0654, SR 0654 over Mosquito Creek,
    23             Anthony Township, Bridge Replacement          674,000
    24             (Base Construction Allocation -
    25             $539,000)
    26             (Land Allocation - $34,000)
    27             (Design and Contingencies - $101,000)
    28         (20)  SR 0973, SR 0973 over Mud Run,
    29             Mifflin Township, Bridge Replacement          294,000
    30             (Base Construction Allocation -
    19970S0186B0179                 - 212 -

     1             $252,000)
     2             (Land Allocation - $20,000)
     3             (Design and Contingencies - $22,000)
     4         (21)  SR 1005, SR 1005 over Plunketts
     5             Creek, Plunketts Creek Township, Bridge
     6             Replacement                                   366,000
     7             (Base Construction Allocation -
     8             $293,000)
     9             (Land Allocation - $18,000)
    10             (Design and Contingencies - $55,000)
    11         (22)  SR 2061, SR 2061 over Sugar Run,
    12             Moreland Township, Bridge Replacement         443,000
    13             (Base Construction Allocation -
    14             $354,000)
    15             (Land Allocation - $22,000)
    16             (Design and Contingencies - $67,000)
    17         (23)  SR 2085, SR 2085 over Muncy Creek,
    18             Penn Township, Bridge Replacement           1,050,000
    19             (Base Construction Allocation -
    20             $840,000)
    21             (Land Allocation - $53,000)
    22             (Design and Contingencies - $157,000)
    23         (24)  SR 0405, East Water Street over Glade
    24             Run, Muncy Borough, Bridge Replacement        500,000
    25             (Base Construction Allocation -
    26             $350,000)
    27             (Land Allocation - $50,000)
    28             (Design and Contingencies - $100,000)
    29  Section 46.  McKean County.
    30     (a)  Local Bridges
    19970S0186B0179                 - 213 -

     1         (1)  Foster Township, T-359, Garlock Hollow
     2             Bridge over Kendall Creek, Bridge
     3             Replacement                                   580,000
     4             (Base Construction Allocation -
     5             $400,000)
     6             (Land Allocation - $20,000)
     7             (Design and Contingencies - $160,000)
     8     (b)  State Bridges
     9         (1)  SR 3009, Kinzua Creek Bridge over
    10             Kinzua Creek, Borough of Mt. Jewett,
    11             Bridge Replacement                            880,000
    12             (Base Construction Allocation -
    13             $700,000)
    14             (Land Allocation - $30,000)
    15             (Design and Contingencies - $150,000)
    16         (2)  SR 4005, Kendall Creek Bridge over
    17             Kendall Creek, City of Bradford, Bridge
    18             Replacement                                   800,000
    19             (Base Construction Allocation -
    20             $650,000)
    21             (Land Allocation - $50,000)
    22             (Design and Contingencies - $100,000)
    23  Section 47.  Mercer County.
    24     (a)  Local Bridges
    25         (1)  City of Sharon, Service Avenue Bridge
    26             over Pine Run, Bridge Replacement             240,000
    27             (Base Construction Allocation -
    28             $210,000)
    29             (Land Allocation - $5,000)
    30             (Design and Contingencies - $25,000)
    19970S0186B0179                 - 214 -

     1         (2)  City of Sharon, Wengler Avenue Bridge
     2             over Pine Hollow Run, Bridge
     3             Replacement                                   218,000
     4             (Base Construction Allocation -
     5             $193,000)
     6             (Land Allocation - $5,000)
     7             (Design and Contingencies - $20,000)
     8         (3)  Pine Township, T-355, Pinchlong Road
     9             Bridge over Swamp Run, Bridge
    10             Replacement                                   203,000
    11             (Base Construction Allocation -
    12             $178,000)
    13             (Land Allocation - $5,000)
    14             (Design and Contingencies - $20,000)
    15         (4)  Pine Township, T-878, Diamond Road
    16             Bridge over Wolf Creek, Bridge
    17             Replacement                                 1,813,000
    18             (Base Construction Allocation -
    19             $1,668,000)
    20             (Land Allocation - $60,000)
    21             (Design and Contingencies - $85,000)
    22         (5)  Pine Township, T-413, Daugherty Road
    23             Bridge over Wolf Run, Bridge
    24             Replacement                                   407,000
    25             (Base Construction Allocation -
    26             $352,000)
    27             (Land Allocation - $15,000)
    28             (Design and Contingencies - $40,000)
    29         (6)  Shenango Township, T-955, Oak Hill
    30             Road Bridge over Turkey Run, Bridge
    19970S0186B0179                 - 215 -

     1             Replacement                                   297,000
     2             (Base Construction Allocation -
     3             $257,000)
     4             (Land Allocation - $10,000)
     5             (Design and Contingencies - $30,000)
     6         (7)  Shenango Township, Heasley Road Bridge
     7             over Tributary of Shenango River,
     8             Bridge Replacement                            173,000
     9             (Base Construction Allocation -
    10             $155,000)
    11             (Land Allocation - $3,000)
    12             (Design and Contingencies - $15,000)
    13         (8)  Springfield Township, T-722, Spring
    14             Road Bridge over Mill Run, Bridge
    15             Replacement                                   230,000
    16             (Base Construction Allocation -
    17             $200,000)
    18             (Land Allocation - $5,000)
    19             (Design and Contingencies - $25,000)
    20         (9)  Worth Township, T-912, Jack Atwell
    21             Road Bridge over Wolf Creek, Bridge
    22             Replacement                                   297,000
    23             (Base Construction Allocation -
    24             $257,000)
    25             (Land Allocation - $10,000)
    26             (Design and Contingencies - $30,000)
    27     (b)  State Bridges
    28         (1)  SR 0058, SR 0058 over Sugar Creek,
    29             Greene Township, Bridge Replacement           270,000
    30             (Base Construction Allocation -
    19970S0186B0179                 - 216 -

     1             $200,000)
     2             (Land Allocation - $20,000)
     3             (Design and Contingencies - $50,00)
     4         (2)  SR 0058, SR 0058 over Tributary of
     5             Shenango River, Greenville Borough,
     6             Bridge Replacement                            250,000
     7             (Base Construction Allocation -
     8             $200,000)
     9             (Land Allocation - $20,000)
    10             (Design and Contingencies - $30,000)
    11         (3)  SR 0058, SR 0058 over I-79, Findley
    12             Township, Bridge Replacement                1,630,000
    13             (Base Construction Allocation -
    14             $1,500,000)
    15             (Land Allocation - $30,000)
    16             (Design and Contingencies - $100,000)
    17         (4)  SR 0062, SR 0062 over Shenango
    18             River/Riverside Drive, City of Sharon,
    19             Bridge Replacement                          2,780,000
    20             (Base Construction Allocation -
    21             $2,500,000)
    22             (Land Allocation - $30,000)
    23             (Design and Contingencies - $250,000)
    24         (5)  SR 0158, SR 0158 over Little
    25             Neshannock Creek, Wilmington Township,
    26             Bridge Replacement                            770,000
    27             (Base Construction Allocation -
    28             $650,000)
    29             (Land Allocation - $40,000)
    30             (Design and Contingencies - $80,000)
    19970S0186B0179                 - 217 -

     1         (6)  SR 0173, SR 0173 over Mill Creek, New
     2             Lebanon Borough, Bridge Replacement           430,000
     3             (Base Construction Allocation -
     4             $350,000)
     5             (Land Allocation - $20,000)
     6             (Design and Contingencies - $60,000)
     7         (7)  SR 0208, SR 0208 over Wolf Creek,
     8             Grove City Borough, Bridge Replacement      1,000,000
     9             (Base Construction Allocation -
    10             $870,000)
    11             (Land Allocation - $30,000)
    12             (Design and Contingencies - $100,000)
    13         (8)  SR 0258, SR 0258 over Daley Run,
    14             Jefferson Township, Bridge Replacement        430,000
    15             (Base Construction Allocation -
    16             $350,000)
    17             (Land Allocation - $20,000)
    18             (Design and Contingencies - $60,000)
    19         (9)  SR 0318, SR 0318 over Shenango
    20             River/Street/Railroad, West Middlesex
    21             Borough, Bridge Replacement                 4,400,000
    22             (Base Construction Allocation -
    23             $3,700,000)
    24             (Land Allocation - $100,000)
    25             (Design and Contingencies - $600,000)
    26         (10)  SR 0518, SR 0518 over Pine Hollow
    27             Run, City of Hermitage, Bridge
    28             Replacement                                   410,000
    29             (Base Construction Allocation -
    30             $300,000)
    19970S0186B0179                 - 218 -

     1             (Land Allocation - $30,000)
     2             (Design and Contingencies - $80,000)
     3         (11)  SR 0846, SR 0846 over Shenango
     4             Reservoir, South Pymatuning Township,
     5             Bridge Replacement                          1,500,000
     6             (Base Construction Allocation -
     7             $1,340,000)
     8             (Land Allocation - $10,000)
     9             (Design and Contingencies - $150,000)
    10         (12)  SR 2006, SR 2006 over I-79,
    11             Springfield Township, Bridge
    12             Replacement                                 1,100,000
    13             (Base Construction Allocation -
    14             $1,000,000)
    15             (Land Allocation - $10,000)
    16             (Design and Contingencies - $90,000)
    17         (13)  SR 2014, SR 2014 over Mill Creek,
    18             Findley Township, Bridge Replacement          330,000
    19             (Base Construction Allocation -
    20             $240,000)
    21             (Land Allocation - $20,000)
    22             (Design and Contingencies - $70,000)
    23         (14)  SR 2025, SR 2025 over Lake Barmore
    24             Outlet, Pine Township, Bridge
    25             Replacement                                   300,000
    26             (Base Construction Allocation -
    27             $230,000)
    28             (Land Allocation - $10,000)
    29             (Design and Contingencies - $60,000)
    30         (15)  SR 3011, SR 3011 over I-80, Shenango
    19970S0186B0179                 - 219 -

     1             Township, Bridge Replacement                  810,000
     2             (Base Construction Allocation -
     3             $700,000)
     4             (Land Allocation - $10,000)
     5             (Design and Contingencies - $100,000)
     6         (16)  SR 4014, SR 4014 over Shenango River,
     7             Delaware Township, Bridge Replacement         920,000
     8             (Base Construction Allocation -
     9             $800,000)
    10             (Land Allocation - $20,000)
    11             (Design and Contingencies - $100,000)
    12  Section 48.  Mifflin County.
    13     (a)  Local Bridges
    14         (1)  Oliver Township, T-803, Bridge over
    15             Musser Run, Bridge Replacement                492,000
    16             (Base Construction Allocation -
    17             $390,000)
    18             (Land Allocation - $2,000)
    19             (Design and Contingencies - $100,000)
    20     (b)  State Bridges
    21         (1)  SR 0022, Bridge over Kish Creek,
    22             Lewistown Borough, Bridge Painting            800,000
    23             (Base Construction Allocation -
    24             $720,000)
    25             (Design and Contingencies - $80,000)
    26         (2)  SR 3017, Bridge over Juniata River,
    27             Wayne Township, Bridge Painting               935,000
    28             (Base Construction Allocation -
    29             $850,000)
    30             (Design and Contingencies - $85,000)
    19970S0186B0179                 - 220 -

     1  Section 49.  Monroe County.
     2     (a)  Local Bridges (Reserved)
     3     (b)  State Bridges
     4         (1)  SR 0447, SR 0447 over Broadhead Creek
     5             and Railroad, Stroud Township, Bridge
     6             Rehabilitation                              1,395,000
     7             (Base Construction Allocation -
     8             $1,071,000)
     9             (Design and Contingencies - $324,000)
    10         (2)  SR 3003, Silver Spring Boulevard over
    11             Chapple Creek, Eldred Township, Bridge
    12             Replacement                                   280,000
    13             (Base Construction Allocation -
    14             $130,000)
    15             (Land Allocation - $50,000)
    16             (Design and Contingencies - $100,000)
    17         (3)  SR 2012, SR 2012 over Broadhead Creek,
    18             East Stroudsburg Borough, Bridge
    19             Rehabilitation                              1,500,000
    20             (Base Construction Allocation -
    21             $1,150,000)
    22             (Design and Contingencies - $350,000)
    23         (4)  SR 0080, I-80 Westbound over
    24             Tunkhannock Creek at County Line,
    25             Tobyhanna Township, Bridge
    26             Rehabilitation                                935,000
    27             (Base Construction Allocation -
    28             $720,000)
    29             (Design and Contingencies - $215,000)
    30         (5)  SR 0080, I-80 Eastbound over
    19970S0186B0179                 - 221 -

     1             Tunkhannock Creek at County Line,
     2             Tunkhannock Township, Bridge
     3             Rehabilitation                                935,000
     4             (Base Construction Allocation -
     5             $720,000)
     6             (Design and Contingencies - $215,000)
     7         (6)  SR 4003, SR 4003 over Lehigh River at
     8             Lackawanna County Line, Coolbaugh
     9             Township, Bridge Rehabilitation               390,000
    10             (Base Construction Allocation -
    11             $295,000)
    12             (Design and Contingencies - $95,000)
    13         (7)  Norristown Borough, Markley Street
    14             Bridge over Stoney Creek, Bridge
    15             Replacement                                 1,250,000
    16             (Base Construction Allocation -
    17             $1,000,000)
    18             (Land Allocation - $50,000)
    19             (Design and Contingencies - $200,000)
    20         (8)  Norristown Borough, Markley Street
    21             Bridge over Stoney Creek, Bridge
    22             Rehabilitation                                500,000
    23             (Base Construction Allocation -
    24             $400,000)
    25             (Land Allocation - $10,000)
    26             (Design and Contingencies - $90,000)
    27         (9)  Horsham Township, Davis Grove Road
    28             over Park Creek, Bridge Replacement           300,000
    29             (Base Construction Allocation -
    30             $230,000)
    19970S0186B0179                 - 222 -

     1             (Land Allocation - $20,000)
     2             (Design and Contingencies - $50,000)
     3         (10)  Franconia Township, Keller Creamery
     4             Road over Indian Creek, Bridge
     5             Replacement                                   320,000
     6             (Base Construction Allocation -
     7             $250,000)
     8             (Land Allocation - $20,000)
     9             (Design and Contingencies - $50,000)
    10         (11)  East Norriton Township, Germantown
    11             Pike over Five Mile Run Creek, Bridge
    12             Replacement                                   500,000
    13             (Base Construction Allocation -
    14             $430,000)
    15             (Land Allocation - $20,000)
    16             (Design and Contingencies - $50,000)
    17         (12)  Upper Hanover Township, Eleventh
    18             Street over Macoby Creek, Bridge
    19             Replacement                                   400,000
    20             (Base Construction Allocation -
    21             $340,000)
    22             (Land Allocation - $20,000)
    23             (Design and Contingencies - $40,000)
    24         (13)  Lower Merion Township, Black Rock
    25             Road over Mill Creek, Bridge
    26             Replacement                                   350,000
    27             (Base Construction Allocation -
    28             $295,000)
    29             (Land Allocation - $20,000)
    30             (Design and Contingencies - $35,000)
    19970S0186B0179                 - 223 -

     1         (14)  Lower Merion Township, Morris Road
     2             over Mill Creek, Bridge Replacement           350,000
     3             (Base Construction Allocation -
     4             $285,000)
     5             (Land Allocation - $20,000)
     6             (Design and Contingencies - $45,000)
     7         (15)  Upper Merion Township, Conrail over
     8             South Gulph Road, Bridge Replacement        4,500,000
     9             (Base Construction Allocation -
    10             $4,250,000)
    11             (Land Allocation - $50,000)
    12             (Design and Contingencies - $200,000)
    13         (16)  Trappe Borough, College Avenue over
    14             Buckwalter Tributary, Bridge
    15             Replacement                                   140,000
    16             (Base Construction Allocation -
    17             $120,000)
    18             (Design and Contingencies - $20,000)
    19  Section 50.  Montgomery County.
    20     (a)  Local Bridges
    21         (1)  Norristown Borough, Hospital Bridge
    22             over Stony Creek, Bridge Replacement          412,000
    23             (Base Construction Allocation -
    24             $365,000)
    25             (Land Allocation - $10,000)
    26             (Design and Contingencies - $37,000)
    27         (2)  Trappe Borough, College Avenue Bridge
    28             over Tributary of Perkiomen Creek,
    29             Bridge Replacement                            360,000
    30             (Base Construction Allocation -
    19970S0186B0179                 - 224 -

     1             $300,000)
     2             (Land Allocation - $10,000)
     3             (Design and Contingencies - $50,000)
     4         (3)  Towamencin Township, Bustard Road
     5             Bridge over Towamencin Creek, Bridge
     6             Replacement                                   454,000
     7             (Base Construction Allocation -
     8             $400,000)
     9             (Land Allocation - $10,000)
    10             (Design and Contingencies - $44,000)
    11         (4)  Upper Hanover Township, T-444,
    12             Treichler Road Bridge under Reading
    13             Railroad, Bridge Removal                      151,000
    14             (Base Construction Allocation -
    15             $126,000)
    16             (Land Allocation - $5,000)
    17             (Design and Contingencies - $20,000)
    18         (5)  Upper Providence Township, T-400,
    19             Supio Road Bridge under Reading
    20             Railroad, Bridge Removal                      187,000
    21             (Base Construction Allocation -
    22             $157,000)
    23             (Land Allocation - $5,000)
    24             (Design and Contingencies - $25,000)
    25         (6)  Upper Salford Township, T-444, Bridge
    26             over Abandoned Railroad, Bridge
    27             Removal                                     1,175,000
    28             (Base Construction Allocation -
    29             $1,000,000)
    30             (Land Allocation - $25,000)
    19970S0186B0179                 - 225 -

     1             (Design and Contingencies - $150,000)
     2         (7)  Norristown Borough, Markley Street
     3             Bridge over Stoney Creek, Bridge
     4             Replacement                                 1,250,000
     5             (Base Construction Allocation -
     6             $1,000,000)
     7             (Land Allocation - $50,000)
     8             (Design and Contingencies - $200,000)
     9         (8)  Norristown Borough, Markley Street
    10             Bridge over Stoney Creek, Bridge
    11             Rehabilitation                                500,000
    12             (Base Construction Allocation -
    13             $400,000)
    14             (Land Allocation - $10,000)
    15             (Design and Contingencies - $90,000)
    16         (9)  Horsham Township, Davis Grove Road
    17             over Park Creek, Bridge Replacement           300,000
    18             (Base Construction Allocation -
    19             $230,000)
    20             (Land Allocation - $20,000)
    21             (Design and Contingencies - $50,000)
    22         (10)  Franconia Township, Keller Creamery
    23             Road over Indian Creek, Bridge
    24             Replacement                                   320,000
    25             (Base Construction Allocation -
    26             $250,000)
    27             (Land Allocation - $20,000)
    28             (Design and Contingencies - $50,000)
    29         (11)  East Norriton Township, Germantown
    30             Pike over Five Mile Run Creek, Bridge
    19970S0186B0179                 - 226 -

     1             Replacement                                   500,000
     2             (Base Construction Allocation -
     3             $430,000)
     4             (Land Allocation - $20,000)
     5             (Design and Contingencies - $50,000)
     6         (12)  Upper Hanover Township, Eleventh
     7             Street over Macoby Creek, Bridge
     8             Replacement                                   400,000
     9             (Base Construction Allocation -
    10             $340,000)
    11             (Land Allocation - $20,000)
    12             (Design and Contingencies - $40,000)
    13         (13)  Lower Merion Township, Black Rock
    14             Road over Mill Creek, Bridge
    15             Replacement                                   350,000
    16             (Base Construction Allocation -
    17             $295,000)
    18             (Land Allocation - $20,000)
    19             (Design and Contingencies - $35,000)
    20         (14)  Lower Merion Township, Morris Road
    21             over Mill Creek, Bridge Replacement           350,000
    22             (Base Construction Allocation -
    23             $285,000)
    24             (Land Allocation - $20,000)
    25             (Design and Contingencies - $45,000)
    26         (15)  Upper Merion Township, Conrail over
    27             South Gulph Road, Bridge Replacement        4,500,000
    28             (Base Construction Allocation -
    29             $4,250,000)
    30             (Land Allocation - $50,000)
    19970S0186B0179                 - 227 -

     1             (Design and Contingencies - $200,000)
     2         (16)  Trappe Borough, College Avenue over
     3             Buckwalter Tributary, Bridge
     4             Replacement                                   140,000
     5             (Base Construction Allocation -
     6             $120,000)
     7             (Design and Contingencies - $20,000)
     8     (b)  State Bridges
     9         (1)  SR 2009, Byberry Road Bridge over
    10             Southampton Creek, Upper Moreland
    11             Township and Bryn Athyn Borough,
    12             Historic Bridge Replacement                   680,000
    13             (Base Construction Allocation -
    14             $500,000)
    15             (Land Allocation - $20,000)
    16             (Design and Contingencies - $160,000)
    17         (2)  SR 2018, Bethlehem Pike Bridge over
    18             Branch of Wissahickon Creek,
    19             Springfield Township, Bridge
    20             Rehabilitation                                525,000
    21             (Base Construction Allocation -
    22             $400,000)
    23             (Land Allocation - $25,000)
    24             (Design and Contingencies - $100,000)
    25         (3)  SR 4030, New Hanover Square Road
    26             Bridge over West Swamp Creek (Two
    27             Bridges), New Hanover Township, Bridge
    28             Replacement                                 1,150,000
    29             (Base Construction Allocation -
    30             $900,000)
    19970S0186B0179                 - 228 -

     1             (Land Allocation - $50,000)
     2             (Design and Contingencies - $200,000)
     3         (4)  SR 0100, Extended, (Three Bridges),
     4             High Street to Farmington Road,
     5             Pottstown Borough and Upper Pottsgrove
     6             Township, Bridge Rehabilitation             1,650,000
     7             (Base Construction Allocation -
     8             $1,500,000)
     9             (Land Allocation - $50,000)
    10             (Design and Contingencies - $100,000)
    11         (5)  SR 1017, Salfordville Road Bridge over
    12             East Branch of Perkiomen Creek, Lower
    13             Salford Township, Bridge Replacement        1,500,000
    14             (Base Construction Allocation -
    15             $1,250,000)
    16             (Land Allocation - $50,000)
    17             (Design and Contingencies - $200,000)
    18         (6)  SR 1024, Salford Station (Two Bridges)
    19             over Perkiomen Creek, Upper Salford and
    20             Lower Fredrick Townships, Bridge
    21             Replacement                                 1,200,000
    22             (Base Construction Allocation -
    23             $1,000,000)
    24             (Land Allocation - $50,000)
    25             (Design and Contingencies - $150,000)
    26         (7)  SR 3020, Dannehower Bridge over River
    27             and New US 202, Upper Merion Township,
    28             Bridgeport and Norristown Boroughs,
    29             Bridge Painting                               872,000
    30             (Base Construction Allocation -
    19970S0186B0179                 - 229 -

     1             $802,000)
     2             (Design and Contingencies - $70,000)
     3         (8)  SR 3039, South Gulph Road Overpass
     4             under Conrail, Upper Merion Township,
     5             Bridge Replacement                          1,500,000
     6             (Base Construction Allocation -
     7             $1,300,000)
     8             (Land Allocation - $50,000)
     9             (Design and Contingencies - $150,000)
    10         (9)  SR 4003, Black Rock Road Bridge over
    11             Abandoned Reading Track, Upper
    12             Providence Township, Bridge Removal           205,000
    13             (Base Construction Allocation -
    14             $175,000)
    15             (Land Allocation - $10,000)
    16             (Design and Contingencies - $20,000)
    17         (10)  SR 4012, Graterford Road Bridge over
    18             Perkiomen Creek, Skippack and Perkiomen
    19             Townships, Bridge Replacement               1,475,000
    20             (Base Construction Allocation -
    21             $1,300,000)
    22             (Land Allocation - $50,000)
    23             (Design and Contingencies - $125,000)
    24  Section 51.  Montour County.
    25     (a)  Local Bridges
    26         (1)  Derry Township, T-407, County Bridge
    27             No.13 over West Branch of Chillisquaque
    28             Creek near Washingtonville Borough,
    29             Bridge Replacement                            350,000
    30             (Base Construction Allocation -
    19970S0186B0179                 - 230 -

     1             $265,000)
     2             (Land Allocation - $35,000)
     3             (Design and Contingencies - $50,000)
     4     (b)  State Bridges
     5         (1)  SR 1004, Bridge over Chillisquaque
     6             Creek, North of Washingtonville
     7             Borough, Bridge Replacement                   620,000
     8             (Base Construction Allocation -
     9             $500,000)
    10             (Land Allocation - $40,000)
    11             (Design and Contingencies - $80,000)
    12         (2)  SR 1006, Bridge over Branch of
    13             Chillisquaque Creek, 3 Miles Northwest
    14             of Washingtonville Borough, Bridge
    15             Replacement                                   510,000
    16             (Base Construction Allocation -
    17             $410,000)
    18             (Land Allocation - $25,000)
    19             (Design and Contingencies - $80,000)
    20         (3)  SR 3004, Bridge over Beaver Run, 2
    21             Miles West of Moresburg, Bridge
    22             Replacement                                   285,000
    23             (Base Construction Allocation -
    24             $227,000)
    25             (Land Allocation - $14,000)
    26             (Design and Contingencies - $44,000)
    27         (4)  SR 4001, Bridge over Chillisquaque
    28             Creek, Anthony Township, Bridge
    29             Replacement                                   458,000
    30             (Base Construction Allocation -
    19970S0186B0179                 - 231 -

     1             $366,000)
     2             (Land Allocation - $23,000)
     3             (Design and Contingencies - $69,000)
     4         (5)  SR 0011, SR 0011 over Sechler Run,
     5             Mahoning Township, Bridge Replacement         582,000
     6             (Base Construction Allocation -
     7             $466,000)
     8             (Land Allocation - $29,000)
     9             (Design and Contingencies - $87,000)
    10         (6)  SR 0054, SR 0054 over Chillisquaque
    11             Creek, Anthony Township, Bridge
    12             Replacement                                   547,000
    13             (Base Construction Allocation -
    14             $438,000)
    15             (Land Allocation - $27,000)
    16             (Design and Contingencies - $82,000)
    17         (7)  SR 0642, SR 0642 over Mahoning Creek,
    18             West Hemlock Township, Bridge
    19             Replacement                                   213,000
    20             (Base Construction Allocation -
    21             $170,000)
    22             (Land Allocation - $11,000)
    23             (Design and Contingencies - $32,000)
    24         (8)  SR 1009, SR 1009 over Branch of Lowry
    25             Run, Anthony Township, Bridge
    26             Replacement                                   431,000
    27             (Base Construction Allocation -
    28             $345,000)
    29             (Land Allocation - $21,000)
    30             (Design and Contingencies - $65,000)
    19970S0186B0179                 - 232 -

     1         (9)  SR 1011, SR 1011 over Tributary of
     2             Chillisquaque Creek, Anthony Township,
     3             Bridge Replacement                            212,000
     4             (Base Construction Allocation -
     5             $170,000)
     6             (Land Allocation - $11,000)
     7             (Design and Contingencies - $31,000)
     8  Section 52.  Northampton County.
     9     (a)  Local Bridges
    10         (1)  Lehigh Township, Indiantrail Road
    11             Bridge over Indian Creek, Bridge
    12             Painting                                       16,000
    13             (Base Construction Allocation -
    14             $14,000)
    15             (Design and Contingencies - $2,000)
    16         (2)  Lehigh Township, T-548, Bridge over
    17             Bertsch Creek, Bridge Replacement             400,000
    18             (Base Construction Allocation -
    19             $300,000)
    20             (Land Allocation - $20,000)
    21             (Design and Contingencies - $80,000)
    22         (3)  Lehigh Township, Wood Drive Bridge,
    23             Bridge Replacement                             65,000
    24             (Base Construction Allocation -
    25             $41,000)
    26             (Land Allocation - $4,000)
    27             (Design and Contingencies - $20,000)
    28     (b)  State Bridges
    29         (1)  SR 2017, Tatamy Road over Tributary of
    30             Bushkill Creek, Palmer Township, Bridge
    19970S0186B0179                 - 233 -

     1             Rehabilitation                                240,000
     2             (Base Construction Allocation -
     3             $100,000)
     4             (Land Allocation - $40,000)
     5             (Design and Contingencies - $100,000)
     6         (2)  SR 4020, Maple Drive over Tributary of
     7             Bertsch Creek, Lehigh Township, Bridge
     8             Rehabilitation                                465,000
     9             (Base Construction Allocation -
    10             $275,000)
    11             (Land Allocation - $80,000)
    12             (Design and Contingencies - $110,000)
    13  Section 53.  Northumberland County.
    14     (a)  Local Bridges
    15         (1)  Borough of Milton, Ridge Avenue over
    16             Limestone Run, Bridge Replacement             520,000
    17             (Base Construction Allocation -
    18             $380,000)
    19             (Land Allocation - $20,000)
    20             (Design and Contingencies - $120,000)
    21         (2)  Lewis Township, T-631, Old State Road
    22             Bridge over Branch of Beaver Run,
    23             Bridge Replacement                            220,000
    24             (Base Construction Allocation -
    25             $200,000)
    26             (Design and Contingencies - $20,000)
    27     (b)  State Bridges
    28         (1)  SR 0642, Chillisquaque Creek Bridge
    29             over Chillisquaque Creek, 0.5 Mile East
    30             of Pottsgrove, Bridge Deck Replacement      1,184,000
    19970S0186B0179                 - 234 -

     1             (Base Construction Allocation -
     2             $947,000)
     3             (Land Allocation - $59,000)
     4             (Design and Contingencies - $178,000)
     5         (2)  SR 1005, Delaware Run Bridge over
     6             Delaware Run, 3 Miles North of
     7             Watsontown Borough, Bridge Replacement        509,000
     8             (Base Construction Allocation -
     9             $408,000)
    10             (Land Allocation - $25,000)
    11             (Design and Contingencies - $76,000)
    12         (3)  SR 0045, Bridge over Chillisquaque
    13             Creek, East of SR 0147, Bridge
    14             Painting                                      260,000
    15             (Base Construction Allocation -
    16             $250,000)
    17             (Design and Contingencies - $10,000)
    18         (4)  SR 0054, SR 0054 over North Branch of
    19             Shamokin Creek, Mt. Carmel Township,
    20             Bridge Replacement                            721,000
    21             (Base Construction Allocation -
    22             $577,000)
    23             (Land Allocation - $36,000)
    24             (Design and Contingencies - $108,000)
    25         (5)  SR 2001, SR 2001 over Little Roaring
    26             Creek, Rush Township, Bridge
    27             Replacement                                   415,000
    28             (Base Construction Allocation -
    29             $335,000)
    30             (Land Allocation - $20,000)
    19970S0186B0179                 - 235 -

     1             (Design and Contingencies - $60,000)
     2         (6)  SR 2023, SR 2023 over Conrail, Mt.
     3             Carmel Township, Bridge Replacement         1,275,000
     4             (Base Construction Allocation -
     5             $1,020,000)
     6             (Land Allocation - $64,000)
     7             (Design and Contingencies - $191,000)
     8         (7)  SR 4013, SR 4013 over Plum Creek,
     9             Rockefeller Township, Bridge
    10             Replacement                                   361,000
    11             (Base Construction Allocation -
    12             $289,000)
    13             (Land Allocation - $18,000)
    14             (Design and Contingencies - $54,000)
    15  Section 54.  Perry County.
    16     (a)  Local Bridges
    17         (1)  Tyrone Township, County Bridge No.4,
    18             Rices Bridge over Shermans Creek,
    19             Covered Bridge Replacement                    768,000
    20             (Base Construction Allocation -
    21             $552,000)
    22             (Land Allocation - $77,000)
    23             (Design and Contingencies - $139,000)
    24         (2)  Northeast Madison Township, T-403 over
    25             Bixler Run, Bridge Replacement                585,000
    26             (Base Construction Allocation -
    27             $400,000)
    28             (Land Allocation - $10,000)
    29             (Design and Contingencies - $175,000)
    30     (b)  State Bridges
    19970S0186B0179                 - 236 -

     1         (1)  SR 4006, Raccoon Creek Bridge over
     2             Raccoon Creek, Tuscarora Township,
     3             Bridge Replacement                            466,000
     4             (Base Construction Allocation -
     5             $288,000)
     6             (Land Allocation - $20,000)
     7             (Design and Contingencies - $158,000)
     8         (2)  SR 3002, Horse Valley Road Bridges
     9             (Two Bridges) over Horse Valley Run,
    10             Toboyne Township, Bridge Replacement          725,000
    11             (Base Construction Allocation -
    12             $700,000)
    13             (Land Allocation - $5,000)
    14             (Design and Contingencies - $20,000)
    15  Section 55.  Philadelphia County.
    16     (a)  Local Bridges
    17         (1)  City of Philadelphia, Byberry Road
    18             Bridge over Conrail, Temporary Bridge
    19             Construction                                  511,000
    20             (Base Construction Allocation -
    21             $390,000)
    22             (Land Allocation - $51,000)
    23             (Design and Contingencies - $70,000)
    24         (2)  City of Philadelphia, Wyoming Avenue
    25             Bridge over Former Course Frankford
    26             Creek, West of Castor Avenue, Bridge
    27             Replacement                                 1,300,000
    28             (Base Construction Allocation -
    29             $1,200,000)
    30             (Design and Contingencies - $100,000)
    19970S0186B0179                 - 237 -

     1         (3)  City of Philadelphia, Chelten Avenue
     2             Bridge over SEPTA, West of Wayne
     3             Avenue, Bridge Replacement                  2,300,000
     4             (Base Construction Allocation -
     5             $2,100,000)
     6             (Design and Contingencies - $200,000)
     7         (4)  City of Philadelphia, Fisher's Lane
     8             Bridge over Tacony Creek, West of
     9             Ramona Avenue, Bridge Replacement           1,625,000
    10             (Base Construction Allocation -
    11             $1,400,000)
    12             (Design and Contingencies - $225,000)
    13         (5)  City of Philadelphia, Kingsessing
    14             Avenue Bridge over SEPTA, Bridge
    15             Replacement                                 2,550,000
    16             (Base Construction Allocation -
    17             $2,200,000)
    18             (Land Allocation - $100,000)
    19             (Design and Contingencies - $250,000)
    20         (6)  City of Philadelphia, Montgomery
    21             Bridge over Amtrak, Bridge Replacement      5,275,000
    22             (Base Construction Allocation -
    23             $4,750,000)
    24             (Land Allocation - $125,000)
    25             (Design and Contingencies - $400,000)
    26         (7)  City of Philadelphia, Thomas Avenue
    27             Bridge over SEPTA, Bridge Replacement       3,150,000
    28             (Base Construction Allocation -
    29             $2,750,000)
    30             (Land Allocation - $100,000)
    19970S0186B0179                 - 238 -

     1             (Design and Contingencies - $300,000)
     2         (8)  City of Philadelphia, Sedgley Avenue
     3             Bridge over Conrail, Bridge
     4             Replacement                                 1,000,000
     5             (Base Construction Allocation -
     6             $800,000)
     7             (Land Allocation - $100,000)
     8             (Design and Contingencies - $100,000)
     9         (9)  City of Philadelphia, Lexington Avenue
    10             Bridge over Conrail, Bridge
    11             Replacement                                   420,000
    12             (Base Construction Allocation -
    13             $360,000)
    14             (Land Allocation - $20,000)
    15             (Design and Contingencies - $40,000)
    16         (10)  City of Philadelphia, Greenland
    17             Bridge over Conrail and I-76, Bridge
    18             Replacement                                 1,350,000
    19             (Base Construction Allocation -
    20             $1,100,000)
    21             (Land Allocation - $100,000)
    22             (Design and Contingencies - $150,000)
    23         (11)  City of Philadelphia, Glenwood Drive
    24             Bridge over Conrail, Bridge
    25             Replacement                                 1,450,000
    26             (Base Construction Allocation -
    27             $1,200,000)
    28             (Land Allocation - $100,000)
    29             (Design and Contingencies - $150,000)
    30         (12)  City of Philadelphia, Second Street
    19970S0186B0179                 - 239 -

     1             Bridge over Conrail, Bridge
     2             Replacement                                   740,000
     3             (Base Construction Allocation -
     4             $650,000)
     5             (Land Allocation - $20,000)
     6             (Design and Contingencies - $70,000)
     7         (13)  City of Philadelphia, Cambria Street
     8             Bridge over Conrail, Bridge
     9             Replacement                                 2,750,000
    10             (Base Construction Allocation -
    11             $2,400,000)
    12             (Land Allocation - $100,000)
    13             (Design and Contingencies - $250,000)
    14     (b)  State Bridges
    15         (1)  SR 4007, Germantown Avenue Bridge,
    16             Conrail Overpass, City of Philadelphia,
    17             Bridge Removal                                125,000
    18             (Base Construction Allocation -
    19             $100,000)
    20             (Land Allocation - $10,000)
    21             (Design and Contingencies - $15,000)
    22         (2)  SR 0076, Schuylkill Expressway Bridge
    23             over Schuylkill River, City of
    24             Philadelphia, Bridge Painting               2,580,000
    25             (Base Construction Allocation -
    26             $2,390,000)
    27             (Design and Contingencies - $190,000)
    28         (3)  SR 2003, 5th Street Bridge over
    29             Amtrak, City of Philadelphia, Bridge
    30             Replacement                                 2,400,000
    19970S0186B0179                 - 240 -

     1             (Base Construction Allocation -
     2             $2,000,000)
     3             (Land Allocation - $200,000)
     4             (Design and Contingencies - $200,000)
     5         (4)  SR 3008, Chestnut Street Bridge over
     6             Schuylkill River, City of Philadelphia,
     7             Bridge Painting                               477,000
     8             (Base Construction Allocation -
     9             $426,000)
    10             (Design and Contingencies - $51,000)
    11         (5)  SR 3037, JFK Boulevard Bridge over
    12             Schuylkill River, City of Philadelphia,
    13             Bridge Painting                               857,000
    14             (Base Construction Allocation -
    15             $794,000)
    16             (Design and Contingencies - $63,000)
    17         (6)  SR 0095, Delaware River Expressway
    18             over Westmoreland and Tioga Streets,
    19             City of Philadelphia, Bridge
    20             Rehabilitation                              4,450,000
    21             (Base Construction Allocation -
    22             $4,200,000)
    23             (Land Allocation - $50,000)
    24             (Design and Contingencies - $200,000)
    25  Section 56.  Pike County.
    26     (a)  Local Bridges (Reserved)
    27     (b)  State Bridges
    28         (1)  SR 0390, Bridge Kill Creek Bridge,
    29             North of SR 3002, Green Township,
    30             Bridge Replacement                            430,000
    19970S0186B0179                 - 241 -

     1             (Base Construction Allocation -
     2             $340,000)
     3             (Land Allocation - $10,000)
     4             (Design and Contingencies - $80,000)
     5         (2)  SR 2011, Bridge over Outlet to Sawkill
     6             Pond, South of TR 6, Dingman Township,
     7             Bridge Replacement                            355,000
     8             (Base Construction Allocation -
     9             $275,000)
    10             (Land Allocation - $10,000)
    11             (Design and Contingencies - $70,000)
    12         (3)  SR 0434, Shohola Bridge over Delaware
    13             River, Shohola Township and New York
    14             State Line, Bridge Painting                 2,200,000
    15             (Base Construction Allocation -
    16             $2,000,000)
    17             (Design and Contingencies - $200,000)
    18         (4)  State Bridges, Countywide Bridge Zone
    19             Painting, Bridge Painting                     370,000
    20             (Base Construction Allocation -
    21             $350,000)
    22             (Land Allocation - $10,000)
    23             (Design and Contingencies - $10,000)
    24  Section 57.  (Reserved).
    25  Section 58.  Schuylkill County.
    26     (a)  Local Bridges (Reserved)
    27     (b)  State Bridges
    28         (1)  SR 0054, SR 0054 over Mahanoy Creek,
    29             Mahanoy Township, Bridge Replacement        1,005,000
    30             (Base Construction Allocation -
    19970S0186B0179                 - 242 -

     1             $770,000)
     2             (Design and Contingencies - $235,000)
     3         (2)  SR 0054, SR 0054 over Reading Blue
     4             Mountain and Northern Railroad, Mahanoy
     5             Township, Bridge Rehabilitation               650,000
     6             (Base Construction Allocation -
     7             $500,000)
     8             (Design and Contingencies - $150,000)
     9         (3)  SR 0081, SR 0081 Southbound over
    10             Swatara Creek, Pine Grove Township,
    11             Bridge Rehabilitation                         970,000
    12             (Base Construction Allocation -
    13             $745,000)
    14             (Design and Contingencies - $225,000)
    15         (4)  SR 0081, SR 0081 Northbound over
    16             Swatara Creek, Pine Grove Township,
    17             Bridge Rehabilitation                         970,000
    18             (Base Construction Allocation -
    19             $745,000)
    20             (Design and Contingencies - $225,000)
    21         (5)  SR 0081, SR 0081 Southbound over SR
    22             0443 and Exit Ramp 3, Pine Grove
    23             Township, Bridge Rehabilitation               715,000
    24             (Base Construction Allocation -
    25             $550,000)
    26             (Design and Contingencies - $165,000)
    27         (6)  SR 0081, SR 0081 Northbound over SR
    28             0443 and Exit Ramp 31, Pine Grove
    29             Township, Bridge Rehabilitation               515,000
    30             (Base Construction Allocation -
    19970S0186B0179                 - 243 -

     1             $390,000)
     2             (Design and Contingencies - $125,000)
     3         (7)  SR 0081, I-81 Southbound over T-886,
     4             Oak Grove Road, Pine Grove Township,
     5             Bridge Rehabilitation                         300,000
     6             (Base Construction Allocation -
     7             $200,000)
     8             (Design and Contingencies - $100,000)
     9         (8)  SR 0081, I-81 Northbound over T-886,
    10             Oak Grove Road, Pine Grove Township,
    11             Bridge Rehabilitation                         300,000
    12             (Base Construction Allocation -
    13             $200,000)
    14             (Design and Contingencies - $100,000)
    15         (9)  SR 0061, Bridge over Mahannon Creek at
    16             South Liberty Street, North Manheim
    17             Township, Bridge Rehabilitation               265,000
    18             (Base Construction Allocation -
    19             $175,000)
    20             (Design and Contingencies - $90,000)
    21         (10)  SR 0895, SR 0895 over Lizard Creek,
    22             Village of Snyders, West Penn Township,
    23             Bridge Rehabilitation                         290,000
    24             (Base Construction Allocation -
    25             $190,000)
    26             (Design and Contingencies - $100,000)
    27         (11)  SR 0901, SR 0901 over Mahanoy Creek,
    28             Bridge Rehabilitation                         680,000
    29             (Base Construction Allocation -
    30             $520,000)
    19970S0186B0179                 - 244 -

     1             (Design and Contingencies - $160,000)
     2         (12)  SR 1011, SR 1011 over Big Creek,
     3             Village of Brockton, Schuylkill
     4             Township, Bridge Replacement                  340,000
     5             (Base Construction Allocation -
     6             $160,000)
     7             (Land Allocation - $55,000)
     8             (Design and Contingencies - $125,000)
     9         (13)  SR 1011, SR 1011 over Locust Creek,
    10             Ryan Township, Bridge Rehabilitation          365,000
    11             (Base Construction Allocation -
    12             $180,000)
    13             (Land Allocation - $60,000)
    14             (Design and Contingencies - $125,000)
    15         (14)  SR 2018, SR 2018 over Little
    16             Schuylkill River, Drehersville, East
    17             Brunswick Township, Bridge
    18             Rehabilitation                                385,000
    19             (Base Construction Allocation -
    20             $285,000)
    21             (Design and Contingencies - $100,000)
    22         (15)  SR 4013, SR 4013 over Rausch Creek,
    23             Hegins Township, Bridge Rehabilitation        280,000
    24             (Base Construction Allocation -
    25             $180,000)
    26             (Design and Contingencies - $100,000)
    27         (16)  SR 4022, SR 4022 over Tributary of
    28             Mahantango Creek, Eldred Township,
    29             Bridge Replacement                            310,000
    30             (Base Construction Allocation -
    19970S0186B0179                 - 245 -

     1             $150,000)
     2             (Land Allocation - $50,000)
     3             (Design and Contingencies - $110,000)
     4         (17)  SR 0209, Broad Street over Little
     5             Schuylkill River, Tamaqua Borough,
     6             Bridge Replacement                            600,000
     7             (Base Construction Allocation -
     8             $360,000)
     9             (Land Allocation - $100,000)
    10             (Design and Contingencies - $140,000)
    11         (18)  SR 4022, Broad Street Bridge over
    12             Panther Creek, Tamaqua Borough, Bridge
    13             Replacement                                 1,780,000
    14             (Base Construction Allocation -
    15             $1,220,000)
    16             (Land Allocation - $195,000)
    17             (Design and Contingencies - $365,000)
    18         (19)  SR 4022, SR 4022 over Mahanoy Creek,
    19             Village of Helfenstein, Eldred
    20             Township, Bridge Replacement                1,170,000
    21             (Base Construction Allocation -
    22             $750,000)
    23             (Land Allocation - $195,000)
    24             (Design and Contingencies - $225,000)
    25         (20)  SR 0339, SR 0339 over Catawissa
    26             Creek, North Union Township, Bridge
    27             Replacement                                   984,000
    28             (Base Construction Allocation -
    29             $630,000)
    30             (Land Allocation - $165,000)
    19970S0186B0179                 - 246 -

     1             (Design and Contingencies - $189,000)
     2         (21)  SR 0443, Dock Street Bridge over
     3             Tributary of Schuylkill River, Borough
     4             of Schuylkill Haven, Bridge
     5             Replacement                                   325,000
     6             (Base Construction Allocation -
     7             $150,000)
     8             (Land Allocation - $50,000)
     9             (Design and Contingencies - $125,000)
    10         (22)  SR 0895, SR 0895 over Schuylkill
    11             River, Bridge Replacement                   2,370,000
    12             (Base Construction Allocation -
    13             $1,480,000)
    14             (Land Allocation - $390,000)
    15             (Design and Contingencies - $500,000)
    16         (23)  SR 4011, SR 4011 over Pine Creek,
    17             Hegins Township, Bridge Replacement           720,000
    18             (Base Construction Allocation -
    19             $450,000)
    20             (Land Allocation - $120,000)
    21             (Design and Contingencies - $150,000)
    22         (24)  SR 0895, Auburn Arch over Schuylkill
    23             River, South Manheim Township, Bridge
    24             Replacement                                   550,000
    25             (Base Construction Allocation -
    26             $350,000)
    27             (Land Allocation - $50,000)
    28             (Design and Contingencies - $150,000)
    29  Section 59.  Snyder County.
    30     (a)  Local Bridges (Reserved)
    19970S0186B0179                 - 247 -

     1     (b)  State Bridges
     2         (1)  SR 1011, Pine Street Bridge over Penns
     3             Creek, Selinsgrove, Bridge
     4             Rehabilitation                              1,150,000
     5             (Base Construction Allocation -
     6             $940,000)
     7             (Land Allocation - $10,000)
     8             (Design and Contingencies - $200,000)
     9         (2)  SR 3002, Bridge over Mahantango Creek,
    10             1.5 Miles South of Meiserville, Perry
    11             and Chapman Townships Line, Bridge
    12             Rehabilitation                              1,425,000
    13             (Base Construction Allocation -
    14             $1,211,000)
    15             (Design and Contingencies - $214,000)
    16         (3)  SR 4007, Middle Creek Bridge over
    17             Middle Creek, North of SR 0522 and
    18             South of SR 4012, Bridge Replacement        1,158,000
    19             (Base Construction Allocation -
    20             $926,000)
    21             (Land Allocation - $58,000)
    22             (Design and Contingencies - $174,000)
    23         (4)  SR 0522, Bridge over Middle Creek,
    24             Bridge Painting                               180,000
    25             (Base Construction Allocation -
    26             $170,000)
    27             (Design and Contingencies - $10,000)
    28         (5)  SR 0035, SR 0035 over Tributary of
    29             Mahantango Creek, Perry Township,
    30             Bridge Replacement                            815,000
    19970S0186B0179                 - 248 -

     1             (Base Construction Allocation -
     2             $652,000)
     3             (Land Allocation - $41,000)
     4             (Design and Contingencies - $122,000)
     5         (6)  SR 0104, SR 0104 over Branch of
     6             Mahantango Creek, Perry Township,
     7             Bridge Replacement                            430,000
     8             (Base Construction Allocation -
     9             $345,000)
    10             (Land Allocation - $20,000)
    11             (Design and Contingencies - $65,000)
    12         (7)  SR 0104, SR 0104 over Middle Creek,
    13             Franklin Township, Bridge Replacement         440,000
    14             (Base Construction Allocation -
    15             $350,000)
    16             (Land Allocation - $20,000)
    17             (Design and Contingencies - $70,000)
    18         (8)  SR 0522, SR 0522 over Tributary of
    19             Middle Creek, Spring Township, Bridge
    20             Replacement                                   500,000
    21             (Base Construction Allocation -
    22             $400,000)
    23             (Land Allocation - $25,000)
    24             (Design and Contingencies - $75,000)
    25         (9)  SR 0522, SR 0522 over Tributary of
    26             Middle Creek, Spring Township, Bridge
    27             Replacement                                   896,000
    28             (Base Construction Allocation -
    29             $717,000)
    30             (Land Allocation - $45,000)
    19970S0186B0179                 - 249 -

     1             (Design and Contingencies - $134,000)
     2         (10)  SR 0522, SR 0522 over Tributary of
     3             Middle Creek, Beavertown Borough,
     4             Bridge Replacement                            244,000
     5             (Base Construction Allocation -
     6             $195,000)
     7             (Land Allocation - $12,000)
     8             (Design and Contingencies - $37,000)
     9         (11)  SR 0522, SR 0522 over Tributary of
    10             Middle Creek, Beavertown Borough,
    11             Bridge Replacement                            245,000
    12             (Base Construction Allocation -
    13             $196,000)
    14             (Land Allocation - $12,000)
    15             (Design and Contingencies - $37,000)
    16         (12)  SR 0522, SR 0522 over Kern Run,
    17             Beavertown Borough, Bridge Replacement        570,000
    18             (Base Construction Allocation -
    19             $456,000)
    20             (Land Allocation - $29,000)
    21             (Design and Contingencies - $85,000)
    22         (13)  SR 0522, SR 0522 over Penns Creek,
    23             Selinsgrove Borough, Bridge
    24             Replacement                                 3,167,000
    25             (Base Construction Allocation -
    26             $2,534,000)
    27             (Land Allocation - $158,000)
    28             (Design and Contingencies - $475,000)
    29         (14)  SR 1011, SR 1011 over Tributary of
    30             Penns Creek, Jackson Township, Bridge
    19970S0186B0179                 - 250 -

     1             Replacement                                   241,000
     2             (Base Construction Allocation -
     3             $193,000)
     4             (Land Allocation - $12,000)
     5             (Design and Contingencies - $36,000)
     6         (15)  SR 2013, SR 2013 over Tributary of
     7             Susquehanna River, Chapman Township,
     8             Bridge Replacement                            202,000
     9             (Base Construction Allocation -
    10             $162,000)
    11             (Land Allocation - $10,000)
    12             (Design and Contingencies - $30,000)
    13         (16)  SR 3009, SR 3009 over Paxtonville
    14             Creek, Franklin Township, Bridge
    15             Replacement                                 1,512,000
    16             (Base Construction Allocation -
    17             $1,209,000)
    18             (Land Allocation - $76,000)
    19             (Design and Contingencies - $227,000)
    20  Section 60.  Somerset County.
    21     (a)  Local Bridges
    22         (1)  Middlecreek Township, T-338, Blue Hole
    23             Creek Bridge over Blue Hole Creek,
    24             Bridge Replacement                            505,000
    25             (Base Construction Allocation -
    26             $400,000)
    27             (Land Allocation - $10,000)
    28             (Design and Contingencies - $95,000)
    29         (2)  Paint Borough, Pennsylvania Railroad
    30             Bridge over Bedford Street, Bridge
    19970S0186B0179                 - 251 -

     1             Replacement                                   350,000
     2             (Base Construction Allocation -
     3             $250,000)
     4             (Land Allocation - $25,000)
     5             (Design and Contingencies - $75,000)
     6         (3)  Shade Township, T-712, Lipinski Road
     7             Bridge over Dark Shade Creek, Bridge
     8             Replacement                                   560,000
     9             (Base Construction Allocation -
    10             $450,000)
    11             (Land Allocation - $10,000)
    12             (Design and Contingencies - $100,000)
    13         (4)  Somerset Borough, Church Street Bridge
    14             over Parsons Run, Bridge Replacement          350,000
    15             (Base Construction Allocation -
    16             $250,000)
    17             (Land Allocation - $25,000)
    18             (Design and Contingencies - $75,000)
    19         (5)  Windber Borough, South 22nd Street
    20             Bridge over Seese Run, Bridge
    21             Replacement                                   350,000
    22             (Base Construction Allocation -
    23             $250,000)
    24             (Land Allocation - $25,000)
    25             (Design and Contingencies - $75,000)
    26         (6)  Windber Borough, 24th Street Bridge
    27             over Seese Run, Bridge Replacement            350,000
    28             (Base Construction Allocation -
    29             $250,000)
    30             (Land Allocation - $25,000)
    19970S0186B0179                 - 252 -

     1             (Design and Contingencies - $75,000)
     2         (7)  Windber Borough, Village Street Bridge
     3             over Seese Run, Bridge Replacement            350,000
     4             (Base Construction Allocation -
     5             $250,000)
     6             (Land Allocation - $25,000)
     7             (Design and Contingencies - $75,000)
     8         (8)  Summit Township, Keystone Viaduct over
     9             SR 2006, CSX Mainline and Flaugherty
    10             Creek, Bridge Rehabilitation                  715,000
    11             (Base Construction Allocation -
    12             $663,000)
    13             (Design and Contingencies - $52,000)
    14     (b)  State Bridges
    15         (1)  SR 0160, SR 0160 over Tributary of
    16             Boones Run, Stoney Creek Township,
    17             Bridge Replacement                            580,000
    18             (Base Construction Allocation -
    19             $430,000)
    20             (Land Allocation - $25,000)
    21             (Design and Contingencies - $125,000)
    22         (2)  SR 0523, SR 0523 over Whites Creek,
    23             Addison Township, Bridge Replacement          690,000
    24             (Base Construction Allocation -
    25             $510,000)
    26             (Land Allocation - $50,000)
    27             (Design and Contingencies - $130,000)
    28         (3)  SR 1007, SR 1007 over Lambert Run,
    29             Stoney Creek Township, Bridge
    30             Replacement                                   490,000
    19970S0186B0179                 - 253 -

     1             (Base Construction Allocation -
     2             $355,000)
     3             (Land Allocation - $25,000)
     4             (Design and Contingencies - $110,000)
     5         (4)  SR 1017, SR 1017 over Breastwork Run,
     6             Allegheny Township, Bridge Replacement        650,000
     7             (Base Construction Allocation -
     8             $490,000)
     9             (Land Allocation - $25,000)
    10             (Design and Contingencies - $135,000)
    11         (5)  SR 1017, SR 1017 over Breastwork Run,
    12             Allegheny Township, Bridge Replacement        580,000
    13             (Base Construction Allocation -
    14             $440,000)
    15             (Land Allocation - $25,000)
    16             (Design and Contingencies - $135,000)
    17         (6)  SR 1018, SR 1018 over Beaverdam Run,
    18             Shade Township, Bridge Replacement            545,000
    19             (Base Construction Allocation -
    20             $400,000)
    21             (Land Allocation - $25,000)
    22             (Design and Contingencies - $120,000)
    23         (7)  SR 1018, SR 1018 over Beaverdam Run,
    24             Shade Township, Bridge Replacement            515,000
    25             (Base Construction Allocation -
    26             $375,000)
    27             (Land Allocation - $25,000)
    28             (Design and Contingencies - $115,000)
    29         (8)  SR 2005, SR 2005 over Elk Lick Creek,
    30             Elk Lick Township, Bridge Replacement         520,000
    19970S0186B0179                 - 254 -

     1             (Base Construction Allocation -
     2             $380,000)
     3             (Land Allocation - $25,000)
     4             (Design and Contingencies - $115,000)
     5         (9)  SR 4013, SR 4013 over North Branch of
     6             Quemahoning Creek, Lincoln Township,
     7             Bridge Replacement                            585,000
     8             (Base Construction Allocation -
     9             $435,000)
    10             (Land Allocation - $25,000)
    11             (Design and Contingencies - $125,000)
    12         (10)  SR 4019, SR 4019 over Quemahoning
    13             Creek, Quemahoning Township, Bridge
    14             Replacement                                   800,000
    15             (Base Construction Allocation -
    16             $625,000)
    17             (Land Allocation - $25,000)
    18             (Design and Contingencies - $150,000)
    19         (11)  SR 3039, SR 3039 over Allen Creek,
    20             Middlecreek Township, Bridge
    21             Replacement                                   200,000
    22             (Base Construction Allocation -
    23             $150,000)
    24             (Land Allocation - $5,000)
    25             (Design and Contingencies - $45,000)
    26         (12)  SR 3039, SR 3039 over Allen Creek,
    27             Middlecreek Township, Bridge
    28             Replacement                                   220,000
    29             (Base Construction Allocation -
    30             $150,000)
    19970S0186B0179                 - 255 -

     1             (Land Allocation - $10,000)
     2             (Design and Contingencies - $60,000)
     3         (13)  SR 4001, SR 4001 over Clear Run,
     4             Jefferson Township, Bridge Replacement        295,000
     5             (Base Construction Allocation -
     6             $200,000)
     7             (Land Allocation - $10,000)
     8             (Design and Contingencies - $85,000)
     9  Section 61.  Sullivan County.
    10     (a)  Local Bridges
    11         (1)  Forks Township, T-448, Old TR 87
    12             Bridge, County Bridge No.55 over Little
    13             Loyalsock Creek, Bridge Replacement           860,000
    14             (Base Construction Allocation -
    15             $700,000)
    16             (Land Allocation - $10,000)
    17             (Design and Contingencies - $150,000)
    18         (2)  Forks and Laporte Townships, T-346
    19             over Loyalsock Creek, Bridge
    20             Replacement                                   840,000
    21             (Base Construction Allocation -
    22             $730,000)
    23             (Land Allocation - $10,000)
    24             (Design and Contingencies - $100,000)
    25     (b)  State Bridges
    26         (1)  SR 0087, SR 0087 over Lick Run, Forks
    27             Township, Bridge Replacement                  635,000
    28             (Base Construction Allocation -
    29             $508,000)
    30             (Land Allocation - $32,000)
    19970S0186B0179                 - 256 -

     1             (Design and Contingencies - $95,000)
     2         (2)  SR 0087, SR 0087 over Little Loyalsock
     3             Creek, Cherry Township, Bridge
     4             Replacement                                   655,000
     5             (Base Construction Allocation -
     6             $524,000)
     7             (Land Allocation - $33,000)
     8             (Design and Contingencies - $98,000)
     9         (3)  SR 0154, SR 0154 over Black Water Run,
    10             Elkland Township, Bridge Replacement          194,000
    11             (Base Construction Allocation -
    12             $166,000)
    13             (Design and Contingencies - $28,000)
    14         (4)  SR 0154, SR 0154 over Kings Creek,
    15             Elkland Township, Bridge Replacement          404,000
    16             (Base Construction Allocation -
    17             $323,000)
    18             (Land Allocation - $20,000)
    19             (Design and Contingencies - $61,000)
    20         (5)  SR 1012, SR 1012 over Little Loyalsock
    21             Creek, Cherry Township, Bridge
    22             Replacement                                   260,000
    23             (Base Construction Allocation -
    24             $208,000)
    25             (Land Allocation - $13,000)
    26             (Design and Contingencies - $39,000)
    27  Section 62.  Susquehanna County.
    28     (a)  Local Bridges (Reserved)
    29     (b)  State Bridges
    30         (1)  SR 0167, Owego Street Bridge over
    19970S0186B0179                 - 257 -

     1             Branch of Fall Brook, Bridgewater
     2             Township, Bridge Replacement                  413,000
     3             (Base Construction Allocation -
     4             $342,000)
     5             (Land Allocation - $10,000)
     6             (Design and Contingencies - $61,000)
     7         (2)  SR 1016, Salt Lick Creek Bridge over
     8             Branch of Salt Lick Creek, New Milford
     9             Township, Bridge Replacement                  100,000
    10             (Base Construction Allocation -
    11             $86,000)
    12             (Land Allocation - $3,000)
    13             (Design and Contingencies - $11,000)
    14         (3)  SR 0081, Bridge over Trowbridge Creek,
    15             1 Mile South of the Pennsylvania and
    16             New York State Line, Great Bend
    17             Township, Bridge Replacement                  890,000
    18             (Base Construction Allocation -
    19             $700,000)
    20             (Land Allocation - $10,000)
    21             (Design and Contingencies - $180,000)
    22         (4)  SR 1017, Gulf Street Bridge, 0.5 Mile
    23             North of SR 1015, Lanesboro Borough,
    24             Bridge Replacement                            305,000
    25             (Base Construction Allocation -
    26             $220,000)
    27             (Land Allocation - $10,000)
    28             (Design and Contingencies - $75,000)
    29         (5)  SR 3003, Bridge over Transue Creek,
    30             1.5 Miles South of SR 3005, Auburn
    19970S0186B0179                 - 258 -

     1             Township, Bridge Painting                      60,000
     2             (Base Construction Allocation -
     3             $50,000)
     4             (Design and Contingencies - $10,000)
     5         (6)  SR 3006, Bridge over White Creek, 1.5
     6             Miles West of SR 3004, Springville
     7             Township, Bridge Painting                      70,000
     8             (Base Construction Allocation -
     9             $60,000)
    10             (Design and Contingencies - $10,000)
    11         (7)  SR 0011, Bridge over Salt Lick Creek,
    12             0.6 Mile North of TR 492, New Milford
    13             Borough, Bridge Replacement                   660,000
    14             (Base Construction Allocation -
    15             $510,000)
    16             (Land Allocation - $20,000)
    17             (Design and Contingencies - $130,000)
    18         (8)  SR 0367, Bridge over Tuscarora Creek,
    19             North of SR 3005, Auburn Township,
    20             Bridge Replacement                            330,000
    21             (Base Construction Allocation -
    22             $265,000)
    23             (Land Allocation - $10,000)
    24             (Design and Contingencies - $65,000)
    25         (9)  SR 1010, Bridge over Bedbug Creek,
    26             West of SR 1021, Oakland Township,
    27             Bridge Replacement                            325,000
    28             (Base Construction Allocation -
    29             $250,000)
    30             (Land Allocation - $10,000)
    19970S0186B0179                 - 259 -

     1             (Design and Contingencies - $65,000)
     2         (10)  SR 1010, Bridge over Tributary of
     3             Susquehanna River, 2 Miles West of SR
     4             1021, Great Bend Township, Bridge
     5             Replacement                                   288,000
     6             (Base Construction Allocation -
     7             $220,000)
     8             (Land Allocation - $10,000)
     9             (Design and Contingencies - $58,000)
    10         (11)  SR 2046, Bridge over Branch of
    11             Tunkhannock Creek, East of TR 92,
    12             Gibson Township, Bridge Replacement           513,000
    13             (Base Construction Allocation -
    14             $400,000)
    15             (Land Allocation - $10,000)
    16             (Design and Contingencies - $103,000)
    17         (12)  SR 3017, Bridge over Thomas Creek,
    18             Southeast of TR 29, Springville
    19             Township, Bridge Replacement                  285,000
    20             (Base Construction Allocation -
    21             $220,000)
    22             (Land Allocation - $10,000)
    23             (Design and Contingencies - $50,000)
    24         (13)  State Bridges, Countywide Bridge Zone
    25             Painting, Bridge Painting                     370,000
    26             (Base Construction Allocation -
    27             $350,000)
    28             (Land Allocation - $10,000)
    29             (Design and Contingencies - $10,000)
    30         (14)  SR 0858, Branch of Apolacon Creek,
    19970S0186B0179                 - 260 -

     1             0.3 Mile North of SR 4013, Apolacon
     2             Township, Bridge Replacement                  220,000
     3             (Base Construction Allocation -
     4             $180,000)
     5             (Land Allocation - $10,000)
     6             (Design and Contingencies - $30,000)
     7         (15)  SR 1010, SR 1010 over Tributary of
     8             Susquehanna River, Great Bend Township,
     9             Bridge Replacement                            230,000
    10             (Base Construction Allocation -
    11             $190,000)
    12             (Land Allocation - $10,000)
    13             (Design and Contingencies - $30,000)
    14         (16)  SR 1010, SR 1010 over Bedbug Creek,
    15             Oakland Township, Bridge Replacement          270,000
    16             (Base Construction Allocation -
    17             $220,000)
    18             (Land Allocation - $10,000)
    19             (Design and Contingencies - $40,000)
    20         (17)  SR 2046, SR 2046 over Tunkhannock
    21             Creek, Gibson Township, Bridge
    22             Replacement                                   440,000
    23             (Base Construction Allocation -
    24             $370,000)
    25             (Land Allocation - $10,000)
    26             (Design and Contingencies - $60,000)
    27  Section 63.  Tioga County.
    28     (a)  Local Bridges
    29         (1)  Elkland Borough, North Buffalo Street
    30             over Camp Brook Creek, Bridge
    19970S0186B0179                 - 261 -

     1             Replacement                                   510,000
     2             (Base Construction Allocation) -
     3             $360,000)
     4             (Land Allocation - $20,000)
     5             (Design and Contingencies - $130,000)
     6     (b)  State Bridges
     7         (1)  SR 0249, Losey Creek Bridge, South of
     8             SR 4017 in Village of Keeneyville,
     9             Middlebury Township, Bridge
    10             Rehabilitation                                250,000
    11             (Base Construction Allocation -
    12             $210,000)
    13             (Land Allocation - $5,000)
    14             (Design and Contingencies - $35,000)
    15         (2)  SR 1002, Corey Creek Bridge over Corey
    16             Creek, Northeast of Mansfield, Bridge
    17             Replacement                                   346,000
    18             (Base Construction Allocation -
    19             $277,000)
    20             (Land Allocation - $17,000)
    21             (Design and Contingencies - $52,000)
    22         (3)  SR 3001, Kettle Creek Bridge, 11 Miles
    23             South of Watrous, Bridge Replacement          366,000
    24             (Base Construction Allocation -
    25             $293,000)
    26             (Land Allocation - $18,000)
    27             (Design and Contingencies - $55,000)
    28         (4)  SR 3023, Heise Run North Bridge, West
    29             of Wellsboro, Bridge Replacement              240,000
    30             (Base Construction Allocation -
    19970S0186B0179                 - 262 -

     1             $192,000)
     2             (Land Allocation - $12,000)
     3             (Design and Contingencies - $36,000)
     4         (5)  SR 4017, Holden Creek Bridge No.1,
     5             Bridge Replacement                            584,000
     6             (Base Construction Allocation -
     7             $467,000)
     8             (Land Allocation - $29,000)
     9             (Design and Contingencies - $88,000)
    10         (6)  SR 4024, Elkhorn Creek Bridge, West of
    11             Tioga Borough, Bridge Replacement             451,000
    12             (Base Construction Allocation -
    13             $401,000)
    14             (Land Allocation - $15,000)
    15             (Design and Contingencies - $35,000)
    16         (7)  SR 3007, Bridge over Stoney Fork
    17             Creek, Bridge Painting                        160,000
    18             (Base Construction Allocation -
    19             $150,000)
    20             (Design and Contingencies - $10,000)
    21         (8)  SR 4017, Bridge over Cowanesque River,
    22             Bridge Painting                               475,000
    23             (Base Construction Allocation -
    24             $465,000)
    25             (Design and Contingencies - $10,000)
    26         (9)  SR 0049, SR 0049 over Cowanesque
    27             River, Westfield Township, Bridge
    28             Replacement                                 1,802,000
    29             (Base Construction Allocation -
    30             $1,442,000)
    19970S0186B0179                 - 263 -

     1             (Land Allocation - $90,000)
     2             (Design and Contingencies - $270,000)
     3         (10)  SR 0287, SR 0287 over Wellsboro
     4             Street - Conrail, Tioga Township,
     5             Bridge Replacement                          1,709,000
     6             (Base Construction Allocation -
     7             $1,367,000)
     8             (Land Allocation - $86,000)
     9             (Design and Contingencies - $256,000)
    10         (11)  SR 0328, SR 0328 over Hammond Creek,
    11             Jackson Township, Bridge Replacement          256,000
    12             (Base Construction Allocation -
    13             $205,000)
    14             (Land Allocation - $13,000)
    15             (Design and Contingencies - $38,000)
    16         (12)  SR 0349, SR 0349 over Mill Creek,
    17             Clymer Township, Bridge Replacement         1,000,000
    18             (Base Construction Allocation -
    19             $800,000)
    20             (Land Allocation - $50,000)
    21             (Design and Contingencies - $150,000)
    22         (13)  SR 1030, SR 1030 over Conrail, Tioga
    23             Township, Bridge Replacement                  561,000
    24             (Base Construction Allocation -
    25             $449,000)
    26             (Land Allocation - $28,000)
    27             (Design and Contingencies - $84,000)
    28         (14)  SR 2017, SR 2017 over Mill Creek,
    29             Union Township, Bridge Replacement            584,000
    30             (Base Construction Allocation -
    19970S0186B0179                 - 264 -

     1             $467,000)
     2             (Land Allocation - $27,000)
     3             (Design and Contingencies - $88,000)
     4         (15)  SR 4017, SR 4017 Bridge No.2 over
     5             Holden Creek, Osceola Township, Bridge
     6             Replacement                                   542,000
     7             (Base Construction Allocation -
     8             $434,000)
     9             (Land Allocation - $27,000)
    10             (Design and Contingencies - $81,000)
    11  Section 64.  Union County.
    12     (a)  Local Bridges (Reserved)
    13     (b)  State Bridges
    14         (1)  SR 0192, Rapid Run Bridge II over
    15             Rapid Run, Lewis Township, Bridge
    16             Rehabilitation                                250,000
    17             (Base Construction Allocation -
    18             $200,000)
    19             (Land Allocation - $13,000)
    20             (Design and Contingencies - $37,000)
    21         (2)  SR 0192, Rapid Run Bridge I over Rapid
    22             Run, Lewis Township, Bridge
    23             Rehabilitation                                205,000
    24             (Base Construction Allocation -
    25             $164,000)
    26             (Land Allocation - $10,000)
    27             (Design and Contingencies - $31,000)
    28         (3)  SR 0044, Bridge over Spring Creek,
    29             Bridge Painting                               110,000
    30             (Base Construction Allocation -
    19970S0186B0179                 - 265 -

     1             $100,000)
     2             (Design and Contingencies - $10,000)
     3         (4)  SR 1004, Bridge over Little Buffalo
     4             Creek, Bridge Painting                         75,000
     5             (Base Construction Allocation -
     6             $65,000)
     7             (Design and Contingencies - $10,000)
     8         (5)  SR 1012, Bridge over White Deer Hole
     9             Creek, Bridge Painting                        160,000
    10             (Base Construction Allocation -
    11             $150,000)
    12             (Design and Contingencies - $10,000)
    13         (6)  SR 0235, SR 0235 over Laurel Run,
    14             Hartley Township, Bridge Replacement        1,118,000
    15             (Base Construction Allocation -
    16             $894,000)
    17             (Land Allocation - $56,000)
    18             (Design and Contingencies - $168,000)
    19         (7)  SR 0235, SR 0235 over Buffalo Creek,
    20             Lewis Township, Bridge Replacement            395,000
    21             (Base Construction Allocation -
    22             $316,000)
    23             (Land Allocation - $20,000)
    24             (Design and Contingencies - $59,000)
    25  Section 65.  Venango County.
    26     (a)  Local Bridges
    27         (1)  Richland Township, T-552 over Mill
    28             Creek, Bridge Replacement                     475,000
    29             (Base Construction Allocation -
    30             $355,000)
    19970S0186B0179                 - 266 -

     1             (Land Allocation - $10,000)
     2             (Design and Contingencies - $110,000)
     3         (2)  Richland Township, T-361 over unnamed
     4             tributary of Mill Creek, Bridge
     5             Replacement                                   337,000
     6             (Base Construction Allocation -
     7             $242,000)
     8             (Land Allocation - $10,000)
     9             (Design and Contingencies - $85,000)
    10         (3)  Richland Township, T-377 over Sage
    11             Run, Bridge Replacement                       385,000
    12             (Base Construction Allocation -
    13             $290,000)
    14             (Land Allocation - $10,000)
    15             (Design and Contingencies - $85,000)
    16         (4)  Pinegrove Township, T-628 over East
    17             Sandy Creek, Bridge Replacement               363,000
    18             (Base Construction Allocation -
    19             $307,000)
    20             (Land Allocation - $6,000)
    21             (Design and Contingencies - $50,000)
    22         (5)  Cranberry Township, T-679 over Branch
    23             of Sage Run, Bridge Replacement               106,000
    24             (Base Construction Allocation -
    25             $100,000)
    26             (Land Allocation - $1,000)
    27             (Design and Contingencies - $5,000)
    28         (6)  Oakland Township, T-567 over Branch of
    29             Two Mile Run, Bridge Replacement              106,000
    30             (Base Construction Allocation -
    19970S0186B0179                 - 267 -

     1             $100,000)
     2             (Land Allocation - $1,000)
     3             (Design and Contingencies - $5,000)
     4         (7)  Rockland Township, T-512 over East
     5             Sandy Creek, Bridge Replacement               360,000
     6             (Base Construction Allocation -
     7             $300,000)
     8             (Land Allocation - $10,000)
     9             (Design and Contingencies - $50,000)
    10         (8)  Pinegrove Township, T-628 over East
    11             Sandy Creek, Bridge Replacement               510,000
    12             (Base Construction Allocation -
    13             $400,000)
    14             (Land Allocation - $10,000)
    15             (Design and Contingencies - $100,000)
    16     (b)  State Bridges
    17         (1)  SR 4001, SR 4001 over Two Mile Run
    18             West Branch, Sugarcreek Borough, Bridge
    19             Replacement                                   205,000
    20             (Base Construction Allocation -
    21             $150,000)
    22             (Land Allocation - $5,000)
    23             (Design and Contingencies - $50,000)
    24         (2)  SR 0227, SR 0227 over Cherry Run,
    25             Cornplanter Township, Bridge
    26             Replacement                                   280,000
    27             (Base Construction Allocation -
    28             $200,000)
    29             (Land Allocation - $20,000)
    30             (Design and Contingencies - $60,000)
    19970S0186B0179                 - 268 -

     1         (3)  SR 0322, SR 0322 over Halls Run,
     2             Cranberry Township, Bridge Replacement      2,600,000
     3             (Base Construction Allocation -
     4             $2,000,000)
     5             (Land Allocation - $100,000)
     6             (Design and Contingencies - $500,000)
     7         (4)  SR 3009, SR 3009 over I-80, Scrubgrass
     8             Township, Bridge Replacement                  810,000
     9             (Base Construction Allocation -
    10             $700,000)
    11             (Land Allocation - $10,000)
    12             (Design and Contingencies - $100,000)
    13         (5)  SR 3017, SR 3017 over Warden Run,
    14             Canal Township, Bridge Replacement            920,000
    15             (Base Construction Allocation -
    16             $800,000)
    17             (Land Allocation - $20,000)
    18             (Design and Contingencies - $100,000)
    19         (6)  SR 0038, SR 0038 over Pine Run,
    20             Richland Township, Bridge
    21             Rehabilitation                                110,000
    22             (Base Construction Allocation -
    23             $100,000)
    24             (Design and Contingencies - $10,000)
    25         (7)  SR 3025, SR 3025 over Hays Run, City
    26             of Oil City, Bridge Replacement               340,000
    27             (Base Construction Allocation -
    28             $300,000)
    29             (Land Allocation - $5,000)
    30             (Design and Contingencies - $35,000)
    19970S0186B0179                 - 269 -

     1  Section 66.  Warren County.
     2     (a)  Local Bridges (Reserved)
     3     (b)  State Bridges
     4         (1)  SR 0006, SR 0006 over Wintroth Run,
     5             Brokenstraw Township, Bridge
     6             Replacement                                   260,000
     7             (Base Construction Allocation -
     8             $180,000)
     9             (Land Allocation - $20,000)
    10             (Design and Contingencies - $60,000)
    11         (2)  SR 0006, SR 0006 over Six Mile Run,
    12             Mead Township, Bridge Replacement             320,000
    13             (Base Construction Allocation -
    14             $250,000)
    15             (Land Allocation - $10,000)
    16             (Design and Contingencies - $60,000)
    17         (3)  SR 0027, SR 0027 over Pine Creek,
    18             Southwest Township, Bridge Replacement        800,000
    19             (Base Construction Allocation -
    20             $580,000)
    21             (Land Allocation - $20,000)
    22             (Design and Contingencies - $200,000)
    23         (4)  SR 0027, SR 0027 over Hazeltine Hollow
    24             Run, Brokenstraw Township, Bridge
    25             Replacement                                   310,000
    26             (Base Construction Allocation -
    27             $210,000)
    28             (Land Allocation - $20,000)
    29             (Design and Contingencies - $80,000)
    30         (5)  SR 0062, SR 0062 over Bully Run,
    19970S0186B0179                 - 270 -

     1             Watson Township, Bridge Replacement           300,000
     2             (Base Construction Allocation -
     3             $230,000)
     4             (Land Allocation - $20,000)
     5             (Design and Contingencies - $50,000)
     6         (6)  SR 0957, SR 0957 over Little
     7             Brokenstraw Creek, Freehold Township,
     8             Bridge Replacement                            800,000
     9             (Base Construction Allocation -
    10             $620,000)
    11             (Land Allocation - $20,000)
    12             (Design and Contingencies - $160,000)
    13         (7)  SR 3009, SR 3009 over Tidioute Creek,
    14             Deerfield Township, Bridge Replacement        470,000
    15             (Base Construction Allocation -
    16             $400,000)
    17             (Land Allocation - $10,000)
    18             (Design and Contingencies - $60,000)
    19         (8)  SR 4013, SR 4013 over Mathews Run,
    20             Youngsville Borough, Bridge
    21             Replacement                                   430,000
    22             (Base Construction Allocation -
    23             $360,000)
    24             (Land Allocation - $10,000)
    25             (Design and Contingencies - $60,000)
    26         (9)  SR 4021, SR 4021 over Brands Run,
    27             Sugar Grove Borough, Bridge
    28             Replacement                                   240,000
    29             (Base Construction Allocation -
    30             $180,000)
    19970S0186B0179                 - 271 -

     1             (Land Allocation - $20,000)
     2             (Design and Contingencies - $40,000)
     3  Section 67.  Washington County.
     4     (a)  Local Bridges
     5         (1)  Burgettstown Borough, Raccoon Bridge
     6             No.23 over Raccoon Creek, Bridge
     7             Rehabilitation                                433,000
     8             (Base Construction Allocation -
     9             $313,000)
    10             (Land Allocation - $20,000)
    11             (Design and Contingencies - $100,000)
    12         (2)  Chartiers Township, Allison Hollow
    13             Road, One-Lane Bridge, Bridge
    14             Replacement                                   195,000
    15             (Base Construction Allocation -
    16             $150,000)
    17             (Land Allocation - $5,000)
    18             (Design and Contingencies - $40,000)
    19         (3)  Chartiers Township, Allison Hollow
    20             Road, One-Lane Bridge, Bridge
    21             Replacement                                   195,000
    22             (Base Construction Allocation -
    23             $150,000)
    24             (Land Allocation - $5,000)
    25             (Design and Contingencies - $40,000)
    26         (4)  Chartiers Township, McGovern Road
    27             Bridge, Bridge Replacement                    145,000
    28             (Base Construction Allocation -
    29             $100,000)
    30             (Land Allocation - $5,000)
    19970S0186B0179                 - 272 -

     1             (Design and Contingencies - $40,000)
     2         (5)  North Strabane Township, T-643, Galley
     3             Road Bridge over Little Chartiers
     4             Creek, Bridge Replacement                     570,000
     5             (Base Construction Allocation -
     6             $450,000)
     7             (Land Allocation - $20,000)
     8             (Design and Contingencies - $100,000)
     9         (6)  Donegal Township, T-541, Lindsay
    10             Bridge over Buck Run, Bridge
    11             Replacement                                   285,000
    12             (Base Construction Allocation -
    13             $255,000)
    14             (Design and Contingencies - $30,000)
    15         (7)  Donegal Township, T-423, Mays Bridge
    16             over Middle Wheeling Creek, Bridge
    17             Replacement                                   245,000
    18             (Base Construction Allocation -
    19             $215,000)
    20             (Design and Contingencies - $30,000)
    21         (8)  Independence Township, T-649, Cummins
    22             Bridge over Sugar Camp Run, Bridge
    23             Replacement                                   330,000
    24             (Base Construction Allocation -
    25             $300,000)
    26             (Design and Contingencies - $30,000)
    27         (9)  Mount Pleasant Township, T-749, Sabo
    28             Road over Westland Run, Bridge
    29             Replacement                                    25,000
    30             (Base Construction Allocation -
    19970S0186B0179                 - 273 -

     1             $20,000)
     2             (Design and Contingencies - $5,000)
     3         (10)  Mount Pleasant Township, T-606,
     4             Primrose Road over Millers Run, Bridge
     5             Replacement                                    25,000
     6             (Base Construction Allocation -
     7             $20,000)
     8             (Design and Contingencies - $5,000)
     9         (11)  Mount Pleasant Township, T-493,
    10             Meriage Street over Robinson Run
    11             Tributary, Bridge Replacement                  25,000
    12             (Base Construction Allocation -
    13             $20,000)
    14             (Design and Contingencies - $5,000)
    15         (12)  North Bethlehem Township, T-445,
    16             Dague Bridge over Pigeon Creek, Bridge
    17             Replacement                                   250,000
    18             (Base Construction Allocation -
    19             $220,000)
    20             (Design and Contingencies - $30,000)
    21         (13)  North Franklin Township, T-526, Cario
    22             Drive over Unnamed Tributary of Catfish
    23             Creek, Bridge Replacement                      46,000
    24             (Base Construction Allocation -
    25             $42,000)
    26             (Design and Contingencies - $4,000)
    27         (14)  Nottingham Township, T-782, Sundust
    28             Road Culvert, 35 Feet North of
    29             Intersection with SR 1059, Bridge
    30             Replacement                                   101,000
    19970S0186B0179                 - 274 -

     1             (Base Construction Allocation -
     2             $91,000)
     3             (Design and Contingencies - $10,000)
     4         (15)  Nottingham Township, T-828, Barr
     5             Bridge over Mingo Creek, Bridge
     6             Replacement                                   350,000
     7             (Base Construction Allocation -
     8             $310,000)
     9             (Design and Contingencies - $40,000)
    10         (16)  Robinson Township, T-500, Chamberlain
    11             Bridge over Chamberlain Run, Bridge
    12             Replacement                                   285,000
    13             (Base Construction Allocation -
    14             $255,000)
    15             (Design and Contingencies - $30,000)
    16         (17)  Smith Township, T-843, Dunbar Bridge
    17             over Raccoon Creek, Bridge Replacement        285,000
    18             (Base Construction Allocation -
    19             $255,000)
    20             (Design and Contingencies - $30,000)
    21         (18)  City of Washington, Hanna Street
    22             Bridge over Catfish Creek, Bridge
    23             Replacement                                    40,000
    24             (Base Construction Allocation -
    25             $30,000)
    26             (Design and Contingencies - $10,000)
    27         (19)  City of Washington, Rosewood Avenue
    28             Bridge over Catfish Creek, Bridge
    29             Replacement                                    40,000
    30             (Base Construction Allocation -
    19970S0186B0179                 - 275 -

     1             $30,000)
     2             (Design and Contingencies - $10,000)
     3         (20)  West Pike Run Township, T-840, Suzy
     4             Lane over Pike Run Creek, Bridge
     5             Replacement                                   230,000
     6             (Base Construction Allocation -
     7             $210,000)
     8             (Design and Contingencies - $20,000)
     9         (21)  California Borough, Daisytown Bridge
    10             over Pike Run, Bridge Replacement             925,000
    11             (Base Construction Allocation -
    12             $700,000)
    13             (Land Allocation - $50,000)
    14             (Design and Contingencies - $175,000)
    15         (22)  Coal Center Borough, Water Street
    16             Bridge over Pike Run, Bridge
    17             Replacement                                 1,588,000
    18             (Base Construction Allocation -
    19             $1,288,000)
    20             (Land Allocation - $50,000)
    21             (Design and Contingencies - $250,000)
    22         (23)  West Pike Run Township, T-948 over
    23             Pike Run, Bridge Replacement                1,075,000
    24             (Base Construction Allocation -
    25             $850,000)
    26             (Land Allocation - $50,0000)
    27             (Design and Contingencies - $175,000)
    28         (24)  Midway Borough, North Avenue over
    29             Robinson Run Creek, Bridge Replacement         95,000
    30             (Base Construction Allocation -
    19970S0186B0179                 - 276 -

     1             $55,000)
     2             (Land Allocation - $20,000)
     3             (Design and Contingencies - $20,000)
     4         (25)  Canonsburg Borough, Adams Street over
     5             Brush Run, Bridge Replacement                 176,000
     6             (Base Construction Allocation -
     7             $150,000)
     8             (Land Allocation - $1,000)
     9             (Design and Contingencies - $25,000)
    10         (26)  East Finley Township, T-375, County
    11             Bridge No. 32 over Templeton Fork,
    12             Bridge Replacement                            355,000
    13             (Base Construction Allocation -
    14             $300,000)
    15             (Land Allocation - $5,000)
    16             (Design and Contingencies - $50,000)
    17     (b)  State Bridges
    18         (1)  SR 0018, Bridge over Abandoned
    19             Railroad, City of Washington, Bridge
    20             Replacement                                   650,000
    21             (Base Construction Allocation -
    22             $500,000)
    23             (Land Allocation - $25,000)
    24             (Design and Contingencies - $125,000)
    25         (2)  SR 0019, Bridge over Chartiers Creek,
    26             North Strabane and Peters Townships,
    27             Bridge Painting                               161,000
    28             (Base Construction Allocation -
    29             $156,000)
    30             (Design and Contingencies - $5,000)
    19970S0186B0179                 - 277 -

     1         (3)  SR 0070, I-70 Westbound Bridge over SR
     2             3009, Buffalo Township, Bridge
     3             Painting                                      148,000
     4             (Base Construction Allocation -
     5             $143,000)
     6             (Design and Contingencies - $5,000)
     7         (4)  SR 0070, I-70 Eastbound Bridge over SR
     8             3009, Buffalo Township, Bridge
     9             Painting                                      163,000
    10             (Base Construction Allocation -
    11             $158,000)
    12             (Design and Contingencies - $5,000)
    13         (5)  SR 0070, I-70 Bridge over 8th Street,
    14             Donegal Township, Bridge Replacement        2,486,000
    15             (Base Construction Allocation -
    16             $2,211,000)
    17             (Land Allocation - $25,000)
    18             (Design and Contingencies - $250,000)
    19         (6)  SR 0070, I-70 Bridge over Turnback
    20             Road, South Strabane Township, Bridge
    21             Rehabilitation                                990,000
    22             (Base Construction Allocation -
    23             $750,000)
    24             (Land Allocation - $40,000)
    25             (Design and Contingencies - $200,000)
    26         (7)  SR 0070, I-70 Bridge over SR 0519,
    27             Somerset Township, Bridge
    28             Rehabilitation                              2,000,000
    29             (Base Construction Allocation -
    30             $1,720,000)
    19970S0186B0179                 - 278 -

     1             (Land Allocation - $40,000)
     2             (Design and Contingencies - $240,000)
     3         (8)  SR 0070, I-70 Bridge over SR 2017,
     4             Somerset Township, Bridge
     5             Rehabilitation                              1,105,000
     6             (Base Construction Allocation -
     7             $865,000)
     8             (Land Allocation - $40,000)
     9             (Design and Contingencies - $200,000)
    10         (9)  SR 0088, Charleroi Bridge over Maple
    11             Creek, Charleroi and Speers Boroughs,
    12             Bridge Replacement                            725,000
    13             (Base Construction Allocation -
    14             $500,000)
    15             (Land Allocation - $25,000)
    16             (Design and Contingencies - $200,000)
    17         (10)  SR 0088, Bridge over Peters Creek,
    18             Finleyville Borough, Bridge Painting           65,000
    19             (Base Construction Allocation -
    20             $65,000)
    21         (11)  SR 0917, Pigeon Creek Bridge over
    22             Branch of Pigeon Creek, Bentleyville
    23             Borough, Bridge Replacement                   570,000
    24             (Base Construction Allocation -
    25             $370,000)
    26             (Land Allocation - $25,000)
    27             (Design and Contingencies - $175,000)
    28         (12)  SR 1005, Bridge over Millers Run,
    29             Cecil Township, Bridge Painting                75,000
    30             (Base Construction Allocation -
    19970S0186B0179                 - 279 -

     1             $75,000)
     2         (13)  SR 1022, Donora Webster Bridge over
     3             Monongahela River and Conrail, Donora
     4             Borough, Bridge Replacement                20,000,000
     5             (Base Construction Allocation -
     6             $15,000,000)
     7             (Land Allocation - $3,000,000)
     8             (Design and Contingencies - $2,000,000)
     9         (14)  SR 1077, Donora-Monessen Bridge over
    10             Monongahela River, PA 837 and 906 and
    11             Railroad, Donora Borough, Bridge
    12             Painting                                    1,000,000
    13             (Base Construction Allocation -
    14             $1,000,000)
    15         (15)  SR 2005, Sowers Run Bridge over
    16             Sowers Run, Amwell Township, Bridge
    17             Replacement                                   435,000
    18             (Base Construction Allocation -
    19             $235,000)
    20             (Land Allocation - $25,000)
    21             (Design and Contingencies - $175,000)
    22         (16)  SR 2011, Bridge over Branch of Little
    23             Tenmile Creek, West Bethlehem Township,
    24             Bridge Replacement                            460,000
    25             (Base Construction Allocation -
    26             $260,000)
    27             (Land Allocation - $25,000)
    28             (Design and Contingencies - $175,000)
    29         (17)  SR 2030, Gorby's Bridge II over Gorby
    30             Run, California Borough, Bridge
    19970S0186B0179                 - 280 -

     1             Rehabilitation                                300,000
     2             (Base Construction Allocation -
     3             $300,000)
     4         (18)  SR 2037, Maple Creek Bridge over
     5             Branch of Maple Creek, Fallowfield
     6             Township, Bridge Replacement                  486,000
     7             (Base Construction Allocation -
     8             $286,000)
     9             (Land Allocation - $25,000)
    10             (Design and Contingencies - $175,000)
    11         (19)  SR 3009, Buffalo Arch Bridge over
    12             Branch of Buffalo Creek and Railroad,
    13             Buffalo Township, Bridge Replacement          535,000
    14             (Base Construction Allocation -
    15             $300,000)
    16             (Land Allocation - $10,000)
    17             (Design and Contingencies - $225,000)
    18         (20)  SR 4015, Bridge over Cherry Run,
    19             Mount Pleasant Township, Bridge
    20             Painting                                       53,000
    21             (Base Construction Allocation -
    22             $51,000)
    23             (Design and Contingencies - $2,000)
    24         (21)  SR 4022, Chartiers Creek Bridge No.2
    25             over Branch of Chartiers Creek, Canton
    26             Township, Bridge Replacement                  415,000
    27             (Base Construction Allocation -
    28             $215,000)
    29             (Land Allocation - $25,000)
    30             (Design and Contingencies - $175,000)
    19970S0186B0179                 - 281 -

     1         (22)  SR 4022, Chartiers Creek Bridge No.1
     2             over Branch of Chartiers Creek, Canton
     3             Township, Bridge Replacement                  405,000
     4             (Base Construction Allocation -
     5             $205,000)
     6             (Land Allocation - $25,000)
     7             (Design and Contingencies - $175,000)
     8         (23)  SR 2034, SR 2034 over Branch of Pike
     9             Run, West Pike Run Township, Bridge
    10             Replacement                                   438,000
    11             (Base Construction Allocation -
    12             $313,000)
    13             (Land Allocation - $25,000)
    14             (Design and Contingencies - $100,000)
    15         (24)  SR 2079, SR 2079 over Pike Run, West
    16             Pike Run Township, Bridge Replacement         988,000
    17             (Base Construction Allocation -
    18             $788,000)
    19             (Land Allocation - $50,000)
    20             (Design and Contingencies - $150,000)
    21  Section 68.  Wayne County.
    22     (a)  Local Bridges (Reserved)
    23     (b)  State Bridges
    24         (1)  SR 0371, Cochecton Bridge No.6 over
    25             Delaware River, Damascus Township,
    26             Bridge Rehabilitation                       1,050,000
    27             (Base Construction Allocation -
    28             $950,000)
    29             (Design and Contingencies - $100,000)
    30         (2)  SR 0380, I-380 Bridge over Lehigh
    19970S0186B0179                 - 282 -

     1             River, Lehigh Township, Bridge
     2             Rehabilitation                                284,000
     3             (Base Construction Allocation -
     4             $244,000)
     5             (Design and Contingencies - $40,000)
     6         (3)  SR 4009, Quarry Bridge over Dyberry
     7             Creek, Dyberry Township, Bridge
     8             Replacement                                   660,000
     9             (Base Construction Allocation -
    10             $500,000)
    11             (Land Allocation - $10,000)
    12             (Design and Contingencies - $150,000)
    13         (4)  SR 0371, Bridge No.6, Damascus
    14             Township, Bridge Painting                   2,200,000
    15             (Base Construction Allocation -
    16             $2,000,000)
    17             (Design and Contingencies - $200,000)
    18         (5)  SR 1020, Bridge No.7 over Delaware
    19             River, Damascus Township, Bridge
    20             Painting                                    3,300,000
    21             (Base Construction Allocation -
    22             $3,000,000)
    23             (Design and Contingencies - $300,000)
    24         (6)  SR 1004, Bridge over Outlet of Beach
    25             Lake, Intersection of SR 1011, Berlin
    26             Township, Bridge Replacement                  345,000
    27             (Base Construction Allocation -
    28             $265,000)
    29             (Land Allocation - $10,000)
    30             (Design and Contingencies - $70,000)
    19970S0186B0179                 - 283 -

     1         (7)  SR 3028, Bridge over TR 191, East of
     2             SR 3031, Cherry Ridge Township, Bridge
     3             Replacement                                   450,000
     4             (Base Construction Allocation -
     5             $350,000)
     6             (Land Allocation - $10,000)
     7             (Design and Contingencies - $90,000)
     8         (8)  State Bridges, Countywide Bridge Zone
     9             Painting, Bridge Painting                     370,000
    10             (Base Construction Allocation -
    11             $350,000)
    12             (Land Allocation - $10,000)
    13             (Design and Contingencies - $10,000)
    14         (9)  SR 1004, SR 1004 over Outlet of Beach
    15             Lake, Berlin Township, Bridge
    16             Replacement                                   260,000
    17             (Base Construction Allocation -
    18             $220,000)
    19             (Land Allocation - $10,000)
    20             (Design and Contingencies - $30,000)
    21         (10)  SR 3028, SR 3028 over TR 191, Cherry
    22             Ridge Township, Bridge Replacement            400,000
    23             (Base Construction Allocation -
    24             $340,000)
    25             (Land Allocation - $10,000)
    26             (Design and Contingencies - $50,000)
    27  Section 69.  Westmoreland County.
    28     (a)  Local Bridges
    29         (1)  Hempfield Township, Airport Hill Road
    30             Bridge over Slate Creek, Bridge
    19970S0186B0179                 - 284 -

     1             Replacement                                   350,000
     2             (Base Construction Allocation -
     3             $280,000)
     4             (Land Allocation - $10,000)
     5             (Design and Contingencies - $60,000)
     6         (2)  Hempfield Township, Sweitzer Road
     7             Bridge over Sewickley Creek, Bridge
     8             Replacement                                   975,000
     9             (Base Construction Allocation -
    10             $800,000)
    11             (Land Allocation - $15,000)
    12             (Design and Contingencies - $160,000)
    13         (3)  Hempfield Township, Ladysmith Road
    14             Bridge over Little Sewickley Creek,
    15             Bridge Replacement                            610,000
    16             (Base Construction Allocation -
    17             $500,000)
    18             (Land Allocation - $10,000)
    19             (Design and Contingencies - $100,000)
    20         (4)  Hempfield Township, Old Route 30
    21             Bridge over Slate Creek, Bridge
    22             Replacement                                   370,000
    23             (Base Construction Allocation -
    24             $300,000)
    25             (Land Allocation - $10,000)
    26             (Design and Contingencies - $60,000)
    27         (5)  Hempfield Township, Old Route 119
    28             Bridge over Tributary of Jacks Run,
    29             Bridge Replacement                            400,000
    30             (Base Construction Allocation -
    19970S0186B0179                 - 285 -

     1             $280,000)
     2             (Land Allocation - $20,000)
     3             (Design and Contingencies - $100,000)
     4         (6)  Jeanette City, 6th Street Bridge over
     5             Brush Creek, Bridge Replacement               460,000
     6             (Base Construction Allocation -
     7             $340,000)
     8             (Land Allocation - $20,000)
     9             (Design and Contingencies - $100,000)
    10         (7)  Ligonier Township, T-605 Bridge over
    11             Two Mile Run, Bridge Replacement              320,000
    12             (Base Construction Allocation -
    13             $200,000)
    14             (Land Allocation - $20,000)
    15             (Design and Contingencies - $100,000)
    16         (8)  Ligonier Township, T-617, Bridge over
    17             Mill Run, Bridge Replacement                  310,000
    18             (Base Construction Allocation -
    19             $190,000)
    20             (Land Allocation - $20,000)
    21             (Design and Contingencies - $100,000)
    22         (9)  Hempfield Township, Possum Hollow Road
    23             Bridge over Tributary of Little
    24             Sewickley Creek, Bridge Replacement           300,000
    25             (Base Construction Allocation -
    26             $180,000)
    27             (Land Allocation - $20,000)
    28             (Design and Contingencies - $100,000)
    29         (10)  South Huntington Township, T-390,
    30             Williams Road Bridge, Bridge
    19970S0186B0179                 - 286 -

     1             Replacement                                   125,000
     2             (Base Construction Allocation -
     3             $100,000)
     4             (Land Allocation - $5,000)
     5             (Design and Contingencies - $20,000)
     6         (11)  South Huntington Township, T-562,
     7             J.D. Smith Road Bridge, Bridge
     8             Replacement                                   155,000
     9             (Base Construction Allocation -
    10             $125,000)
    11             (Land Allocation - $5,000)
    12             (Design and Contingencies - $25,000)
    13         (12)  South Huntington Township, T-386,
    14             Bridge No. 1, Mount Etna Road Bridge,
    15             Bridge Replacement                            145,000
    16             (Base Construction Allocation -
    17             $115,000)
    18             (Land Allocation - $5,000)
    19             (Design and Contingencies - $25,000)
    20         (13)  South Huntington Township, T-386,
    21             Bridge No.2, Mount Etna Road at Remo
    22             Road, Bridge Replacement                      135,000
    23             (Base Construction Allocation -
    24             $110,000)
    25             (Land Allocation - $5,000)
    26             (Design and Contingencies - $20,000)
    27         (14)  South Huntington Township, T-385,
    28             Commer Road Bridge, Bridge Replacement        150,000
    29             (Base Construction Allocation -
    30             $120,000)
    19970S0186B0179                 - 287 -

     1             (Land Allocation - $5,000)
     2             (Design and Contingencies - $25,000)
     3         (15)  Washington Township, T-979, Pleasant
     4             View Road Bridge over Beaver Run,
     5             Bridge Replacement                            385,000
     6             (Base Construction Allocation -
     7             $265,000)
     8             (Land Allocation - $20,000)
     9             (Design and Contingencies - $100,000)
    10         (16)  Derry Township, T-924, Bridge over
    11             Union Run, Bridge Replacement                 578,000
    12             (Base Construction Allocation -
    13             $463,000)
    14             (Land Allocation - $15,000)
    15             (Design and Contingencies - $100,000)
    16         (17)  Derry Township, T-937, Bridge over
    17             Stony Run, Bridge Replacement                 553,000
    18             (Base Construction Allocation -
    19             $438,000)
    20             (Land Allocation - $15,000)
    21             (Design and Contingencies - $100,000)
    22         (18)  Derry Township, T-941, Bridge over
    23             Stony Run, Bridge Replacement                 590,000
    24             (Base Construction Allocation -
    25             $475,000)
    26             (Land Allocation - $15,000)
    27             (Design and Contingencies - $100,000)
    28         (19)  Donegal Township, T-916, Bridge over
    29             Indian Creek, Bridge Replacement              465,000
    30             (Base Construction Allocation -
    19970S0186B0179                 - 288 -

     1             $350,000)
     2             (Land Allocation - $15,000)
     3             (Design and Contingencies - $100,000)
     4         (20)  Donegal Township, T-880, Bridge over
     5             Four Mile Run, Bridge No.3, Bridge
     6             Replacement                                   415,000
     7             (Base Construction Allocation -
     8             $300,000)
     9             (Land Allocation - $15,000)
    10             (Design and Contingencies - $100,000)
    11         (21)  Donegal Township, T-880, Bridge over
    12             Four Mile Run, Bridge No.5, Bridge
    13             Replacement                                   415,000
    14             (Base Construction Allocation -
    15             $300,000)
    16             (Land Allocation - $15,000)
    17             (Design and Contingencies - $100,000)
    18         (22)  Fairfield Township, T-739, Berkey's
    19             Bridge over Unnamed Tributary, Bridge
    20             Replacement                                   200,000
    21             (Base Construction Allocation -
    22             $170,000)
    23             (Land Allocation - $10,000)
    24             (Design and Contingencies - $20,000)
    25         (23)  Fairfield Township, T-847, Bailey's
    26             Bridge over Hendricks Run, Bridge
    27             Replacement                                   200,000
    28             (Base Construction Allocation -
    29             $170,000)
    30             (Land Allocation - $10,000)
    19970S0186B0179                 - 289 -

     1             (Design and Contingencies - $20,000)
     2         (24)  Fairfield Township, T-847, Toby
     3             Bridge over Unnamed Tributary, Bridge
     4             Replacement                                   200,000
     5             (Base Construction Allocation -
     6             $170,000)
     7             (Land Allocation - $10,000)
     8             (Design and Contingencies - $20,000)
     9         (25)  Fairfield Township, T-931, Patterson
    10             Bridge No.1 over Bear Pond Run, Bridge
    11             Replacement                                   200,000
    12             (Base Construction Allocation -
    13             $170,000)
    14             (Land Allocation - $10,000)
    15             (Design and Contingencies - $20,000)
    16         (26)  Fairfield Township, T-984, Love
    17             Hollow Bridge No.1 over Hendricks Run,
    18             Bridge Replacement                            200,000
    19             (Base Construction Allocation -
    20             $170,000)
    21             (Land Allocation - $10,000)
    22             (Design and Contingencies - $20,000)
    23         (27)  Fairfield Township, T-984, Love
    24             Hollow Bridge No.2 over Hendricks Run,
    25             Bridge Replacement                            200,000
    26             (Base Construction Allocation -
    27             $170,000)
    28             (Land Allocation - $10,000)
    29             (Design and Contingencies - $20,000)
    30         (28)  Fairfield Township, T-988, Yeager
    19970S0186B0179                 - 290 -

     1             Hollow Bridge No.1 over Unnamed
     2             Tributary, Bridge Replacement                 200,000
     3             (Base Construction Allocation -
     4             $170,000)
     5             (Land Allocation - $10,000)
     6             (Design and Contingencies - $20,000)
     7         (29)  Fairfield Township, T-988, Yeager
     8             Hollow Bridge No.2 over Unnamed
     9             Tributary, Bridge Replacement                 200,000
    10             (Base Construction Allocation -
    11             $170,000)
    12             (Land Allocation - $10,000)
    13             (Design and Contingencies - $20,000)
    14         (30)  Fairfield Township, T-990, Patterson
    15             Bridge No.2 over Unnamed Tributary,
    16             Bridge Replacement                            200,000
    17             (Base Construction Allocation -
    18             $170,000)
    19             (Land Allocation - $10,000)
    20             (Design and Contingencies - $20,000)
    21         (31)  Ligonier Township, T-505, Horner Hill
    22             Road over Laughlintown Run, Bridge
    23             Replacement                                   175,000
    24             (Base Construction Allocation -
    25             $125,000)
    26             (Land Allocation - $15,000)
    27             (Design and Contingencies - $35,000)
    28         (32)  Ligonier Township, T-607, Weller Road
    29             over Unnamed Stream, Bridge
    30             Replacement                                    10,000
    19970S0186B0179                 - 291 -

     1             (Base Construction Allocation - $8,000)
     2             (Design and Contingencies - $2,000)
     3         (33)  Ligonier Township, T-617, Robb Road
     4             over Hannas Run, Bridge Replacement           310,000
     5             (Base Construction Allocation -
     6             $250,000)
     7             (Land Allocation - $10,000)
     8             (Design and Contingencies - $50,000)
     9         (34)  Ligonier Township, T-719, Peoples
    10             Road over Unnamed Stream, Bridge
    11             Replacement                                   100,000
    12             (Base Construction Allocation -
    13             $75,000)
    14             (Land Allocation - $5,000)
    15             (Design and Contingencies - $20,000)
    16         (35)  Ligonier Township, T-721, Bridge over
    17             North Fork of Trout Run, Bridge
    18             Replacement                                   200,000
    19             (Base Construction Allocation -
    20             $125,000)
    21             (Land Allocation - $10,000)
    22             (Design and Contingencies - $65,000)
    23         (36)  Ligonier Township, T-942, Zion Church
    24             Road over Unnamed Stream, Bridge
    25             Replacement                                    50,000
    26             (Base Construction Allocation -
    27             $35,000)
    28             (Land Allocation - $5,000)
    29             (Design and Contingencies - $10,000)
    30         (37)  Ligonier Township, T-984, Mill Road
    19970S0186B0179                 - 292 -

     1             over Mill Race, Bridge Replacement             50,000
     2             (Base Construction Allocation -
     3             $35,000)
     4             (Land Allocation - $5,000)
     5             (Design and Contingencies - $10,000)
     6         (38)  Ligonier Township, T-950, Old Lincoln
     7             Highway East over Unnamed Stream,
     8             Bridge Rehabilitation                          25,000
     9             (Base Construction Allocation -
    10             $20,000)
    11             (Design and Contingencies - $5,000)
    12         (39)  Ligonier Township, T-984, Harvey Road
    13             over Macks Run, Bridge Rehabilitation           5,000
    14             (Base Construction Allocation - $4,000)
    15             (Design and Contingencies - $1,000)
    16         (40)  Saint Clair Township, T-994, Bridge
    17             over Tubmill Creek, Bridge Replacement        440,000
    18             (Base Construction Allocation -
    19             $325,000)
    20             (Land Allocation - $15,000)
    21             (Design and Contingencies - $100,000)
    22         (41)  Sewickley Township, T-318, Bridge
    23             No.3 over Tributary of Youghiogheny
    24             River, Bridge Replacement                     100,000
    25             (Base Construction Allocation -
    26             $70,000)
    27             (Land Allocation - $5,000)
    28             (Design and Contingencies - $25,000)
    29         (42)  Derry Township, Conrail Overpass over
    30             SR 0981, Bridge Replacement                 1,600,000
    19970S0186B0179                 - 293 -

     1             (Base Construction Allocation -
     2             $1,200,000)
     3             (Land Allocation - $200,000)
     4             (Design and Contingencies - $200,000)
     5         (43)  Hempfield Township, T-399 over Jacks
     6             Run, Bridge Replacement                       428,000
     7             (Base Construction Allocation -
     8             $288,000)
     9             (Land Allocation - $15,000)
    10             (Design and Contingencies - $125,000)
    11         (44)  Hempfield Township, T-550 over
    12             Tributary to Little Sewickley Creek,
    13             Bridge Replacement                            428,000
    14             (Base Construction Allocation -
    15             $288,000)
    16             (Land Allocation - $15,000)
    17             (Design and Contingencies - $125,000)
    18         (45)  Ligonier Township, T-984 over Mill
    19             Creek, Bridge Replacement                     650,000
    20             (Base Construction Allocation -
    21             $450,000)
    22             (Land Allocation - $50,000)
    23             (Design and Contingencies - $150,000)
    24         (46)  Salem Township, T-881, Bridge over
    25             Loyalhanna Creek, Bridge Replacement           81,000
    26             (Base Construction Allocation -
    27             $67,000)
    28             (Design and Contingencies - $14,000)
    29     (b)  State Bridges
    30         (1)  SR 0030, Mill Creek Bridge over Mill
    19970S0186B0179                 - 294 -

     1             Creek, Ligonier Township, Bridge
     2             Replacement                                   910,000
     3             (Base Construction Allocation -
     4             $710,000)
     5             (Land Allocation - $25,000)
     6             (Design and Contingencies - $175,000)
     7         (2)  SR 0031, Jacobs Creek Bridge over
     8             Jacobs Creek, Mount Pleasant and
     9             Bullskin Townships, Bridge Replacement        715,000
    10             (Base Construction Allocation -
    11             $500,000)
    12             (Land Allocation - $40,000)
    13             (Design and Contingencies - $175,000)
    14         (3)  SR0056, Seward Bridge over Conrail and
    15             Local Road, St. Clair Township, Bridge
    16             Painting                                      600,000
    17             (Base Construction Allocation -
    18             $600,000)
    19         (4)  SR 0070, I-70 Bridge over N&W
    20             Railroad, Rostraver Township, Bridge
    21             Rehabilitation                              1,565,000
    22             (Base Construction Allocation -
    23             $1,305,000)
    24             (Land Allocation - $60,000)
    25             (Design and Contingencies - $200,000)
    26         (5)  SR 0070, I-70 Bridge over Conrail,
    27             South Huntington Township, Bridge
    28             Rehabilitation                              3,125,000
    29             (Base Construction Allocation -
    30             $2,780,000)
    19970S0186B0179                 - 295 -

     1             (Land Allocation - $45,000)
     2             (Design and Contingencies - $300,000)
     3         (6)  SR 0119, Crabtree Creek Bridge No.2
     4             over Crabtree Creek, Hempfield
     5             Township, Bridge Replacement                  577,000
     6             (Base Construction Allocation -
     7             $377,000)
     8             (Land Allocation - $25,000)
     9             (Design and Contingencies - $175,000)
    10         (7)  SR 0136, West Newton Bridge over
    11             Youghiogheny River, West Newton
    12             Borough, Bridge Painting                      250,000
    13             (Base Construction Allocation -
    14             $250,000)
    15         (8)  SR 0259, Boliver Underpass Conrail
    16             Railroad over SR 0259, Fairfield
    17             Township, Bridge Replacement                  310,000
    18             (Base Construction Allocation -
    19             $200,000)
    20             (Land Allocation - $10,000)
    21             (Design and Contingencies - $100,000)
    22         (9)  SR 0271, Bridge over Mill Creek,
    23             Ligonier Township, Bridge Painting             87,000
    24             (Base Construction Allocation -
    25             $87,000)
    26         (10)  SR 0711, Bridge over Mill Creek,
    27             Ligonier Township, Bridge Painting            125,000
    28             (Base Construction Allocation -
    29             $125,000)
    30         (11)  SR 0819, Bridge over Stauffer Bridge,
    19970S0186B0179                 - 296 -

     1             Scottdale Borough, Bridge Painting             92,000
     2             (Base Construction Allocation -
     3             $92,000)
     4         (12)  SR 0981, Bridge over Branch of Barron
     5             Run, South Huntington Township, Bridge
     6             Replacement                                   250,000
     7             (Base Construction Allocation -
     8             $250,000)
     9         (13)  SR 0982, Bradenville Bridge over
    10             Saxman Run, Derry Township, Bridge
    11             Replacement                                   330,000
    12             (Base Construction Allocation -
    13             $330,000)
    14         (14)  SR 1027, Stoney Run Bridge over
    15             Stoney Run, Derry Township, Bridge
    16             Replacement                                   340,000
    17             (Base Construction Allocation -
    18             $255,000)
    19             (Land Allocation - $10,000)
    20             (Design and Contingencies - $75,000)
    21         (15)  SR 2008, Fourmile Run Bridge over
    22             Fourmile Run, Cook Township, Bridge
    23             Painting                                       83,000
    24             (Base Construction Allocation -
    25             $83,000)
    26         (16)  SR 2010, Bridge over Branch of Boyer
    27             Run, Mount Pleasant Township, Bridge
    28             Replacement                                   450,000
    29             (Base Construction Allocation -
    30             $250,000)
    19970S0186B0179                 - 297 -

     1             (Land Allocation - $25,000)
     2             (Design and Contingencies - $175,000)
     3         (17)  SR 8036, New Stanton Ramp Bridge over
     4             SR 3091, New Stanton Borough, Bridge
     5             Rehabilitation                                475,000
     6             (Base Construction Allocation -
     7             $395,000)
     8             (Design and Contingencies - $80,000)
     9         (18)  SR 0030, SR 0030 over Mill Creek,
    10             Ligonier Township, Bridge
    11             Rehabilitation                                200,000
    12             (Base Construction Allocation -
    13             $150,000)
    14             (Design and Contingencies - $50,000)
    15         (19)  SR 0030, SR 0030 over Branch of
    16             Loyalhanna Creek, Unity Township,
    17             Bridge Replacement                            245,000
    18             (Base Construction Allocation -
    19             $125,000)
    20             (Land Allocation - $20,000)
    21             (Design and Contingencies - $100,000)
    22         (20)  SR 0217, SR 0217 over Miller Run,
    23             Derry Township, Bridge Replacement            293,000
    24             (Base Construction Allocation -
    25             $188,000)
    26             (Land Allocation - $5,000)
    27             (Design and Contingencies - $100,000)
    28         (21)  SR 0259, SR 0259 over Branch of
    29             Freeman Run, Fairfield Township, Bridge
    30             Replacement                                   218,000
    19970S0186B0179                 - 298 -

     1             (Base Construction Allocation -
     2             $113,000)
     3             (Land Allocation - $5,000)
     4             (Design and Contingencies - $100,000)
     5         (22)  SR 0381, SR 0381 over Branch of
     6             Loyalhanna Creek, Cook Township, Bridge
     7             Replacement                                   670,000
     8             (Base Construction Allocation -
     9             $450,000)
    10             (Land Allocation - $20,000)
    11             (Design and Contingencies - $200,000)
    12         (23)  SR 0381, SR 0381 over Camp Run,
    13             Donegal Township, Bridge Replacement          608,000
    14             (Base Construction Allocation -
    15             $388,000)
    16             (Land Allocation - $20,000)
    17             (Design and Contingencies - $200,000)
    18         (24)  SR 0711, SR 0711 over Mill Creek,
    19             Ligonier Township, Bridge Replacement         600,000
    20             (Base Construction Allocation -
    21             $450,000)
    22             (Land Allocation - $50,000)
    23             (Design and Contingencies - $100,000)
    24         (25)  SR 0982, SR 0982 over Jacobs Creek,
    25             Mount Pleasant Township, Bridge
    26             Replacement                                   938,000
    27             (Base Construction Allocation -
    28             $688,000)
    29             (Land Allocation - $50,000)
    30             (Design and Contingencies - $200,000)
    19970S0186B0179                 - 299 -

     1         (26)  SR 0982, SR 0982 over Nine Mile Run,
     2             Unity Township, Bridge Replacement            348,000
     3             (Base Construction Allocation -
     4             $238,000)
     5             (Land Allocation - $10,000)
     6             (Design and Contingencies - $100,000)
     7         (27)  SR 0982, SR 0982 over Indian Camp
     8             Run, Unity Township, Bridge
     9             Replacement                                   335,000
    10             (Base Construction Allocation -
    11             $225,000)
    12             (Land Allocation - $10,000)
    13             (Design and Contingencies - $100,000)
    14         (28)  SR 1004, SR 1004 over Hendricks
    15             Creek, Fairfield Township, Bridge
    16             Replacement                                   200,000
    17             (Base Construction Allocation -
    18             $170,000)
    19             (Land Allocation - $10,000)
    20             (Design and Contingencies - $20,000)
    21         (29)  SR 1006, SR 1006 over Freeman Run,
    22             Fairfield Township, Bridge Replacement        833,000
    23             (Base Construction Allocation -
    24             $613,000)
    25             (Land Allocation - $20,000)
    26             (Design and Contingencies - $200,000)
    27         (30)  SR 1006, West Bolivar Bridge near
    28             Treasure Island, Fairfield Township,
    29             Bridge Replacement                            200,000
    30             (Base Construction Allocation -
    19970S0186B0179                 - 300 -

     1             $170,000)
     2             (Land Allocation - $10,000)
     3             (Design and Contingencies - $20,000)
     4         (31)  SR 1007, SR 1007 over Tubmill Run,
     5             Fairfield Township, Bridge Replacement        465,000
     6             (Base Construction Allocation -
     7             $350,000)
     8             (Land Allocation - $15,000)
     9             (Design and Contingencies - $100,000)
    10         (32)  SR 1012, SR 1012 over Branch of Megee
    11             Run, Derry Township, Bridge
    12             Replacement                                   318,000
    13             (Base Construction Allocation -
    14             $213,000)
    15             (Land Allocation - $5,000)
    16             (Design and Contingencies - $100,000)
    17         (33)  SR 1014, SR 1014 over Abandoned
    18             Railroad, Derry Township, Bridge
    19             Replacement                                   268,000
    20             (Base Construction Allocation -
    21             $163,000)
    22             (Land Allocation - $5,000)
    23             (Design and Contingencies - $100,000)
    24         (34)  SR 1015, SR 1015 over Hypocrite
    25             Creek, Fairfield Township, Bridge
    26             Replacement                                   200,000
    27             (Base Construction Allocation -
    28             $170,000)
    29             (Land Allocation - $10,000)
    30             (Design and Contingencies - $20,000)
    19970S0186B0179                 - 301 -

     1         (35)  SR 1027, SR 1027 over Branch of Stony
     2             Run, Derry Township, Bridge
     3             Replacement                                   305,000
     4             (Base Construction Allocation -
     5             $200,000)
     6             (Land Allocation - $5,000)
     7             (Design and Contingencies - $100,000)
     8         (36)  SR 1031, SR 1031 over McCune Run,
     9             Derry Township, Bridge Replacement            293,000
    10             (Base Construction Allocation -
    11             $188,000)
    12             (Land Allocation - $5,000)
    13             (Design and Contingencies - $100,000)
    14         (37)  SR 2006, SR 2006 over Branch of
    15             Jacobs Creek, Mt. Pleasant Township,
    16             Bridge Replacement                            403,000
    17             (Base Construction Allocation -
    18             $288,000)
    19             (Land Allocation - $15,000)
    20             (Design and Contingencies - $100,000)
    21         (38)  SR 2007, SR 2007 over Shupe Run, Mt.
    22             Pleasant Township, Bridge Replacement         218,000
    23             (Base Construction Allocation -
    24             $113,000)
    25             (Land Allocation - $5,000)
    26             (Design and Contingencies - $100,000)
    27         (39)  SR 2012, SR 2012 over Brinker Run,
    28             Mt. Pleasant Township, Bridge
    29             Replacement                                   415,000
    30             (Base Construction Allocation -
    19970S0186B0179                 - 302 -

     1             $300,000)
     2             (Land Allocation - $15,000)
     3             (Design and Contingencies - $100,000)
     4         (40)  SR 2021, SR 2021 over Sewickley
     5             Creek, Mt. Pleasant Township, Bridge
     6             Replacement                                 1,463,000
     7             (Base Construction Allocation -
     8             $1,213,000)
     9             (Land Allocation - $50,000)
    10             (Design and Contingencies - $200,000)
    11         (41)  SR 2025, SR 2025 over Tributary of
    12             Jacobs Creek, Mt. Pleasant Township,
    13             Bridge Replacement                            250,000
    14             (Base Construction Allocation -
    15             $225,000)
    16             (Design and Contingencies - $25,000)
    17         (42)  SR 4034, SR 4034 over Pine Run,
    18             Allegheny Township, Bridge Replacement        818,000
    19             (Base Construction Allocation -
    20             $588,000)
    21             (Land Allocation - $30,000)
    22             (Design and Contingencies - $200,000)
    23         (43)  SR 4071, SR 4071 over Branch of Pine
    24             Run, Allegheny Township, Bridge
    25             Replacement                                   305,000
    26             (Base Construction Allocation -
    27             $200,000)
    28             (Land Allocation - $5,000)
    29             (Design and Contingencies - $100,000)
    30         (44)  SR 4089, SR 4089 over Branch of
    19970S0186B0179                 - 303 -

     1             Chartiers Run, Allegheny Township,
     2             Bridge Replacement                            348,000
     3             (Base Construction Allocation -
     4             $238,000)
     5             (Land Allocation - $10,000)
     6             (Design and Contingencies - $100,000)
     7         (45)  T-987, (formerly SR 1071) over
     8             Hypocrite Creek, Fairfield Township,
     9             Four State Bridges, Bridge Replacement        800,000
    10             (Base Construction Allocation -
    11             $680,000)
    12             (Land Allocation - $40,000)
    13             (Design and Contingencies - $80,000)
    14         (46)  SR 0381, SR 0381 over Laughlintown
    15             Run, Ligonier Township, Bridge
    16             Replacement                                   465,000
    17             (Base Construction Allocation -
    18             $350,000)
    19             (Land Allocation - $15,000)
    20             (Design and Contingencies - $100,000)
    21         (47)  SR 2043, SR 2043 over Two Mile Run,
    22             Ligonier Township, Bridge Replacement         465,000
    23             (Base Construction Allocation -
    24             $350,000)
    25             (Land Allocation - $15,000)
    26             (Design and Contingencies - $100,000)
    27         (48)  SR 2045, SR 2045 over Two Mile Run,
    28             Ligonier Township, Bridge Replacement         465,000
    29             (Base Construction Allocation -
    30             $350,000)
    19970S0186B0179                 - 304 -

     1             (Land Allocation - $15,000)
     2             (Design and Contingencies - $100,000)
     3         (49)  SR 2045, SR 2045 over Loyalhanna
     4             Creek, Ligonier Township, Bridge
     5             Replacement                                 1,588,000
     6             (Base Construction Allocation -
     7             $1,313,000)
     8             (Land Allocation - $75,000)
     9             (Design and Contingencies - $200,000)
    10  Section 70.  Wyoming County.
    11     (a)  Local Bridges
    12         (1)  Exeter Township, T-336, Bridge No.1, 2
    13             Miles Southwest of Falls, Bridge
    14             Replacement                                   280,000
    15             (Base Construction Allocation -
    16             $240,000)
    17             (Land Allocation - $10,000)
    18             (Design and Contingencies - $30,000)
    19         (2)  Falls Township, T-336 over White Lock
    20             Stream, Bridge Replacement                    280,000
    21             (Base Construction Allocation -
    22             $240,000)
    23             (Land Allocation - $10,000)
    24             (Design and Contingencies - $30,000)
    25         (3)  Exeter Township, T-336 over Mill
    26             Creek, Bridge Replacement                     214,000
    27             (Base Construction Allocation -
    28             $166,000)
    29             (Land Allocation - $20,000)
    30             (Design and Contingencies - $28,000)
    19970S0186B0179                 - 305 -

     1     (b)  State Bridges
     2         (1)  SR 3001, Bridge at Junction with SR
     3             4004 over Branch of Susquehanna River,
     4             Windham Township, Bridge Painting              60,000
     5             (Base Construction Allocation -
     6             $50,000)
     7             (Design and Contingencies - $10,000)
     8         (2)  State Bridges, Countywide Bridge Zone
     9             Painting, Bridge Painting                     370,000
    10             (Base Construction Allocation -
    11             $350,000)
    12             (Land Allocation - $10,000)
    13             (Design and Contingencies - $10,000)
    14  Section 71.  York County.
    15     (a)  Local Bridges
    16         (1)  Carroll Township, Gettysburg Road
    17             Bridge over Yellow Breeches Creek,
    18             Bridge Replacement                            860,000
    19             (Base Construction Allocation -
    20             $700,000)
    21             (Land Allocation - $10,000)
    22             (Design and Contingencies - $150,000)
    23         (2)  Codorus Township, Seitzville Road over
    24             South Branch of Codorus Creek, Bridge
    25             Replacement                                   300,000
    26             (Base Construction Allocation -
    27             $200,000)
    28             (Land Allocation - $15,000)
    29             (Design and Contingencies - $85,000)
    30         (3)  Dover Township, Cardinal Lane over Fox
    19970S0186B0179                 - 306 -

     1             Run, Bridge Replacement                       115,000
     2             (Base Construction Allocation -
     3             $70,000)
     4             (Land Allocation - $15,000)
     5             (Design and Contingencies - $30,000)
     6         (4)  Dover Township, Conewago Road over
     7             Salem Run, Bridge Replacement                 300,000
     8             (Base Construction Allocation -
     9             $200,000)
    10             (Land Allocation - $15,000)
    11             (Design and Contingencies - $85,000)
    12         (5)  East Hopewell Township, South Church
    13             Street Extended, Bridge No.1, Bridge
    14             Rehabilitation                                  9,000
    15             (Base Construction Allocation - $8,000)
    16             (Design and Contingencies - $1,000)
    17         (6)  East Hopewell Township, South Church
    18             Street Extended, Bridge No.2, over
    19             Rambo Run, Bridge Rehabilitation               60,000
    20             (Base Construction Allocation -
    21             $50,000)
    22             (Design and Contingencies - $10,000)
    23         (7)  East Hopewell Township, Manifold
    24             School Road Bridge, Bridge
    25             Rehabilitation                                  7,000
    26             (Base Construction Allocation - $6,000)
    27             (Design and Contingencies - $1,000)
    28         (8)  East Hopewell Township, Trout School
    29             Road Bridge, Bridge Replacement                45,000
    30             (Base Construction Allocation -
    19970S0186B0179                 - 307 -

     1             $30,000)
     2             (Land Allocation - $5,000)
     3             (Design and Contingencies - $10,000)
     4         (9)  Hellam Township, Valley Acres Road
     5             over Tributary of Kreutz Creek, Bridge
     6             Rehabilitation                                 40,000
     7             (Base Construction Allocation -
     8             $35,000)
     9             (Design and Contingencies - $5,000)
    10         (10)  Hellam Township, Libhart Mill Road
    11             over Tributary of Kreutz Creek, Bridge
    12             Rehabilitation                                 40,000
    13             (Base Construction Allocation -
    14             $35,000)
    15             (Design and Contingencies - $5,000)
    16         (11)  Manchester Township, T-900, Woodland
    17             View Drive over Conrail, Bridge
    18             Replacement                                   395,000
    19             (Base Construction Allocation -
    20             $275,000)
    21             (Land Allocation - $30,000)
    22             (Design and Contingencies - $90,000)
    23         (12)  Manchester Township, T-940, Bear Road
    24             2,000 Feet North of Susquehanna Trail,
    25             Bridge Replacement                             40,000
    26             (Base Construction Allocation -
    27             $25,000)
    28             (Land Allocation - $5,000)
    29             (Design and Contingencies - $10,000)
    30         (13)  Manheim Township, T-320 over Unnamed
    19970S0186B0179                 - 308 -

     1             Tributary of Gunpowder Falls Creek,
     2             Bridge Replacement                            150,000
     3             (Base Construction Allocation -
     4             $100,000)
     5             (Land Allocation - $10,000)
     6             (Design and Contingencies - $40,000)
     7         (14)  Manheim Township, T-346 over West
     8             Branch of Codorus Creek, Bridge
     9             Replacement                                   250,000
    10             (Base Construction Allocation -
    11             $190,000)
    12             (Land Allocation - $10,000)
    13             (Design and Contingencies - $50,000)
    14         (15)  Manheim Township, T-357 over Unnamed
    15             Tributary of West Branch of Codorus
    16             Creek, Bridge Replacement                     160,000
    17             (Base Construction Allocation -
    18             $110,000)
    19             (Land Allocation - $10,000)
    20             (Design and Contingencies - $40,000)
    21         (16)  Manheim Township, T-370 over West
    22             Branch of Codorus Creek, Bridge
    23             Replacement                                   200,000
    24             (Base Construction Allocation -
    25             $140,000)
    26             (Land Allocation - $10,000)
    27             (Design and Contingencies - $50,000)
    28         (17)  Manheim Township, T-413 over West
    29             Branch of Codorus Creek, Bridge
    30             Replacement                                   150,000
    19970S0186B0179                 - 309 -

     1             (Base Construction Allocation -
     2             $100,000)
     3             (Land Allocation - $10,000)
     4             (Design and Contingencies - $40,000)
     5         (18)  Manheim Township, Tannery Road over
     6             West Branch of Codorus Creek, Bridge
     7             Replacement                                   250,000
     8             (Base Construction Allocation -
     9             $180,000)
    10             (Land Allocation - $10,000)
    11             (Design and Contingencies - $60,000)
    12         (19)  Paradise Township, Shady Dell Road,
    13             Bridge Replacement                            190,000
    14             (Base Construction Allocation -
    15             $110,000)
    16             (Land Allocation - $10,000)
    17             (Design and Contingencies - $70,000)
    18         (20)  Paradise Township, Beaver Creek Road
    19             over Beaver Creek, Bridge Replacement         275,000
    20             (Base Construction Allocation -
    21             $195,000)
    22             (Land Allocation - $10,000)
    23             (Design and Contingencies - $70,000)
    24         (21)  Penn Township, Center Street over
    25             Tributary of Oil Creek, Bridge
    26             Replacement                                   183,000
    27             (Base Construction Allocation -
    28             $163,000)
    29             (Land Allocation - $10,000)
    30             (Design and Contingencies - $10,000)
    19970S0186B0179                 - 310 -

     1         (22)  Penn Township, Westminster Avenue
     2             over Plum Creek, Bridge Replacement           230,000
     3             (Base Construction Allocation -
     4             $207,000)
     5             (Land Allocation - $8,000)
     6             (Design and Contingencies - $15,000)
     7         (23)  Penn Township, Park Heights over
     8             Tributary of Plum Creek, Bridge
     9             Replacement                                   244,000
    10             (Base Construction Allocation -
    11             $234,000)
    12             (Design and Contingencies - $10,000)
    13         (24)  Red Lion Borough, North Charles
    14             Street over Former Maryland and
    15             Pennsylvania Railroad, Bridge
    16             Replacement                                   395,000
    17             (Base Construction Allocation -
    18             $275,000)
    19             (Land Allocation - $30,000)
    20             (Design and Contingencies - $90,000)
    21         (25)  Spring Garden Township, Tri Hill Road
    22             over Tyler Run, Bridge Replacement            200,000
    23             (Base Construction Allocation -
    24             $120,000)
    25             (Land Allocation - $20,000)
    26             (Design and Contingencies - $60,000)
    27         (26)  Windsor Borough, West Gay Street over
    28             Fishing Creek, Bridge Replacement             200,000
    29             (Base Construction Allocation -
    30             $120,000)
    19970S0186B0179                 - 311 -

     1             (Land Allocation - $20,000)
     2             (Design and Contingencies - $60,000)
     3         (27)  York Township, School Street over
     4             Branch of Mill Creek, Bridge
     5             Replacement                                   250,000
     6             (Base Construction Allocation -
     7             $200,000)
     8             (Design and Contingencies - $50,000)
     9     (b)  State Bridges
    10         (1)  SR 0194, Broadway Street Bridge over
    11             Red Run, Washington Township, Bridge
    12             Replacement                                   245,000
    13             (Base Construction Allocation -
    14             $150,000)
    15             (Land Allocation - $10,000)
    16             (Design and Contingencies - $85,000)
    17         (2)  SR 0234, East Berlin Road Bridge over
    18             Paradise Creek, Jackson Township,
    19             Bridge Replacement                            325,000
    20             (Base Construction Allocation -
    21             $250,000)
    22             (Land Allocation - $10,000)
    23             (Design and Contingencies - $65,000)
    24         (3)  SR 3074, Smoketown Road Bridge over
    25             Cod Creek, Manheim Township, Bridge
    26             Replacement                                   325,000
    27             (Base Construction Allocation -
    28             $215,000)
    29             (Land Allocation - $10,000)
    30             (Design and Contingencies - $100,000)
    19970S0186B0179                 - 312 -

     1         (4)  SR 0116, York Street over Tributary of
     2             Oil Creek, Penn Township, Bridge
     3             Replacement                                   275,000
     4             (Base Construction Allocation -
     5             $240,000)
     6             (Land Allocation - $15,000)
     7             (Design and Contingencies - $20,000)
     8         (5)  SR 0116, SR 0116 over Codorus Creek,
     9             Spring Grove Borough, Bridge
    10             Replacement                                   300,000
    11             (Base Construction Allocation -
    12             $240,000)
    13             (Land Allocation - $15,000)
    14             (Design and Contingencies - $45,000)
    15         (6)  SR 0194, Frederick Street over Plum
    16             Creek, Penn Township, Bridge
    17             Replacement                                   262,000
    18             (Base Construction Allocation -
    19             $234,000)
    20             (Land Allocation - $8,000)
    21             (Design and Contingencies - $20,000)
    22         (7)  SR 1012, Emig Road over Conrail,
    23             Manchester Township, Bridge
    24             Replacement                                   395,000
    25             (Base Construction Allocation -
    26             $275,000)
    27             (Land Allocation - $30,000)
    28             (Design and Contingencies - $90,000)
    29         (8)  SR 2031, Penn Street over Fishing
    30             Creek, Windsor Borough, Bridge
    19970S0186B0179                 - 313 -

     1             Replacement                                   200,000
     2             (Base Construction Allocation -
     3             $120,000)
     4             (Land Allocation - $20,000)
     5             (Design and Contingencies - $60,000)
     6         (9)  SR 3001, South George Street over
     7             Tyler Run, Spring Garden Township,
     8             Bridge Replacement                            200,000
     9             (Base Construction Allocation -
    10             $120,000)
    11             (Land Allocation - $20,000)
    12             (Design and Contingencies - $60,000)
    13  Section 72.  Statewide.
    14     Construction of advanced wetland mitigation
    15  projects necessary to replace wetlands displaced
    16  by bridge projects authorized under the act of
    17  December 8, 1982 (P.L.848, No.235), known as the
    18  Highway-Railroad and Highway Bridge Capital Budget
    19  Act for 1982-1983                                      3,100,000
    20             (Base Construction Allocation -
    21             $2,500,000)
    22             (Land Allocation - $350,000)
    23             (Design and Contingencies - $250,000)
    24  Section 73.  Limitation on expenditure of funds.
    25     Any moneys derived from the incurring of debt shall be used
    26  solely for effecting the rehabilitation, replacement or removal
    27  of bridges located on State highways. All other bridge
    28  rehabilitation, replacement or removal shall be financed and
    29  State bridge rehabilitation, replacement or removal may also be
    30  financed from current revenue.
    19970S0186B0179                 - 314 -

     1  Section 74.  Debt authorization.
     2     The Governor, Auditor General and State Treasurer are hereby
     3  authorized and directed to borrow from time to time, in addition
     4  to any authorization heretofore or hereafter enacted, on the
     5  credit of the Commonwealth, subject to the limitations provided
     6  in the current capital budget, money not exceeding in the
     7  aggregate the sum of $834,398,000 as may be found necessary to
     8  carry out the acquisition and construction of the State highway
     9  projects specifically itemized in this act.
    10  Section 75.  Issue of bonds.
    11     The indebtedness authorized in this act shall be incurred
    12  from time to time and shall be evidenced by one or more series
    13  of general obligation bonds of the Commonwealth in such
    14  aggregate principal amount for each series as the Governor,
    15  Auditor General and State Treasurer shall determine, but the
    16  latest stated maturity date shall not exceed 30 years from the
    17  date of the bond first issued for each series.
    18  Section 76.  Estimated useful life of projects.
    19     The General Assembly states the estimated useful life of the
    20  projects itemized in this act as 30 years.
    21  Section 77.  Appropriation.
    22     The net proceeds of the sale of the obligations authorized in
    23  this act are hereby appropriated from the Capital Facilities
    24  Fund to the department in the maximum amount of $834,398,000 to
    25  be used by it exclusively to defray the financial costs of the
    26  State projects specifically itemized in this capital budget.
    27  After reserving or paying the expenses of the sale of the
    28  obligation, the State Treasurer shall pay out to the department
    29  the moneys as required and certified by it to be legally due and
    30  payable.
    19970S0186B0179                 - 315 -

     1  Section 78.  Federal funds.
     2     In addition to those funds appropriated in section 77, all
     3  moneys received from the Federal Government for the public
     4  improvement projects specifically itemized in this act are also
     5  hereby appropriated for those projects.
     6  Section 79.  Allocation of funds.
     7     (a)  General rule.--Whenever the department determines that
     8  the full estimated financial costs of the projects itemized in
     9  this act are not necessary for the proper design, acquisition or
    10  construction of such projects, the excess funds no longer
    11  required may be allocated by the department to increase the
    12  estimated costs of any one or more of the projects specifically
    13  itemized in a capital budget.
    14     (b)  Reimbursement of municipal expenditures.--Moneys raised
    15  or expended by municipalities after the effective date of this
    16  act, in anticipation of receipt of funds authorized for projects
    17  itemized by this act, may be reimbursable to those
    18  municipalities.
    19  Section 80.  Policy on jobs and materials.
    20     (a)  Jobs.--It is the declared policy of the Commonwealth
    21  that the construction projects authorized in this act be used,
    22  to the greatest extent possible, to provide for the creation of
    23  jobs and the rehiring of the unemployed in this Commonwealth. In
    24  order to reach this goal, firms with Commonwealth-based
    25  facilities shall be actively solicited to make bids on contracts
    26  to furnish products and materials, including, but not limited
    27  to, steel and steel products, to be used in these projects.
    28     (b)  Materials.--Every contract document entered into to
    29  undertake a project contained in this act shall provide that any
    30  steel or other products to be used or supplied in the
    19970S0186B0179                 - 316 -

     1  performance of this contract shall be required to be
     2  manufactured by plants in the United States unless the secretary
     3  determines, on a contract by contract basis, that certain
     4  required products are not produced in the United States in
     5  sufficient quantities to meet the requirements of the contract.
     6  Such a determination and the reasons therefor shall be published
     7  in the Pennsylvania Bulletin. Decisions made under this
     8  subsection shall not be inconsistent with the general provisions
     9  of the act of March 3, 1978 (P.L.6, No.3), known as the Steel
    10  Products Procurement Act.
    11     (c)  Minorities and women.--It is also the declared policy of
    12  the Commonwealth to require and encourage substantial
    13  participation by minorities and women in the construction
    14  projects authorized by this act.
    15  Section 81.  Payment of capital debt service.
    16     The repayment of any debt incurred pursuant to this act shall
    17  be made from the account and such repayment shall have first
    18  claim on the revenues of the account.
    19  Section 82.  Authorization and debt cumulation.
    20     The additional authorization and debt allowance provided for
    21  in this act shall be added to the total authorizations and debt
    22  incurred pursuant to the act of December 8, 1982 (P.L.848,
    23  No.235), known as the Highway-Railroad and Highway Bridge
    24  Capital Budget Act for 1982-1983, as amended and supplemented.
    25  Section 83.  Editorial changes.
    26     In editing and preparing this act for printing following the
    27  final enactment, the Legislative Reference Bureau shall insert
    28  or revise letters or numbers for projects where the letters or
    29  numbers are missing or require revision. The bureau shall also
    30  revise the total monetary amounts for the total authorization,
    19970S0186B0179                 - 317 -

     1  debt authorization, appropriations and departmental totals as
     2  necessary to agree with the total monetary amounts of the
     3  projects.
     4  Section 84.  Effective date.
     5     This act shall take effect immediately.

















    A3L86BIL/19970S0186B0179        - 318 -