PRINTER'S NO. 179
No. 186 Session of 1997
INTRODUCED BY CORMAN AND STOUT, JANUARY 23, 1997
REFERRED TO TRANSPORTATION, JANUARY 23, 1997
A SUPPLEMENT 1 To the act of December 8, 1982 (P.L.848, No.235), entitled "An 2 act providing for the adoption of capital projects related to 3 the repair, rehabilitation or replacement of highway bridges 4 to be financed from current revenue or by the incurring of 5 debt and capital projects related to highway and safety 6 improvement projects to be financed from current revenue of 7 the Motor License Fund," itemizing additional local and State 8 bridge projects. 9 The General Assembly of the Commonwealth of Pennsylvania 10 hereby enacts as follows: 11 Section 1. Short title. 12 This act shall be known and may be cited as the Highway- 13 Railroad and Highway Bridge Capital Budget Supplemental Act for 14 1995-1996. 15 Section 2. Definitions. 16 The following words and phrases when used in this act shall 17 have the meanings given to them in this section unless the 18 context clearly indicates otherwise: 19 "Account." The Highway Bridge Improvement Restricted Account 20 within the Motor License Fund.
1 "Capital project." A capital project as defined in section 2 1602-B of the act of April 9, 1929 (P.L.343, No.176), known as 3 The Fiscal Code, and shall include a county or municipal bridge 4 rehabilitation, replacement or improvement project as set forth 5 in this act. 6 "Department." The Department of Transportation of the 7 Commonwealth. 8 "Secretary." The Secretary of Transportation of the 9 Commonwealth. 10 Section 3. Total authorization for bridge projects. 11 (a) Total projects.--The total authorization for the costs 12 of the projects itemized pursuant to this act and to be financed 13 from current revenue or by the incurring of debt shall be 14 $1,094,813,000. 15 (b) State projects.--The authorization for capital projects 16 in the category of highway projects to be constructed by the 17 Department of Transportation, its successors or assigns, and to 18 be financed by the incurring of debt or from the highway 19 account, itemized in this act under the category of State 20 bridges, shall be $834,398,000. 21 (c) Non-State projects.--The authorization for non-State 22 highway bridge projects to be constructed by municipalities and 23 to be financed in part with grants not exceeding 80% of the non- 24 Federal share of the costs made to the local government 25 municipalities by the department from revenues deposited in the 26 account itemized in this act under the category of local 27 bridges, shall be $260,415,000. 28 Section 4. Itemization of bridge projects. 29 The individual capital projects in the category of highway 30 projects to be constructed by the Department of Transportation, 19970S0186B0179 - 2 -
1 its successors or assigns, and to be financed from current 2 revenue or by the incurring of debt are hereby itemized, 3 together with their estimated financial costs, in the following 4 sections. 5 Section 5. Adams County. 6 (a) Local Bridges 7 (1) Cumberland Township, T-338, Herr's 8 Ridge Road Bridge over Willoughby Run, 9 Bridge Rehabilitation 170,000 10 (Base Construction Allocation - 11 $100,000) 12 (Land Allocation - $10,000) 13 (Design and Contingencies - $60,000) 14 (2) Cumberland Township, T-402, Horner 15 Road Bridge over Marsh Creek, County 16 Bridge No.111, Bridge Replacement 1,075,000 17 (Base Construction Allocation - 18 $725,000) 19 (Land Allocation - $25,000) 20 (Design and Contingencies - $325,000) 21 (3) Cumberland Township, T-417, Goulden 22 Road Bridge over Rock Creek, County 23 Bridge No.123, Bridge Rehabilitation 330,000 24 (Base Construction Allocation - 25 $250,000) 26 (Land Allocation - $5,000) 27 (Design and Contingencies - $75,000) 28 (4) Cumberland and Freedom Townships, 29 Sach's Mill Covered Bridge over Marsh 30 Creek, Pedestrian Bridge, Bridge 19970S0186B0179 - 3 -
1 Rehabilitation 600,000 2 (Base Construction Allocation - 3 $500,000) 4 Design and Contingencies - $100,000 5 (b) State Bridges (Reserved) 6 Section 6. Allegheny County. 7 (a) Local Bridges 8 (1) Plum Borough, Mary Street Bridge over 9 Plum Creek, Bridge Replacement 630,000 10 (Base Construction Allocation - 11 $400,000) 12 (Land Allocation - $50,000) 13 (Design and Contingencies - $180,000) 14 (2) City of Pittsburgh, Glenwood Bridge, 15 Phase II over Monongahela River, Three 16 Railroads and Carson Street, Bridge 17 Rehabilitation 4,180,000 18 (Base Construction Allocation - 19 $3,905,000) 20 (Design and Contingencies - $275,000) 21 (3) Elizabeth Township, Patterson Road, 22 Boyd Hollow Bridge, Bridge Replacement 225,000 23 (Base Construction Allocation - 24 $180,000) 25 (Land Allocation - $11,000) 26 (Design and Contingencies - $34,000) 27 (4) Elizabeth Township, Yates Street 28 Bridge, Bridge Replacement 198,000 29 (Base Construction Allocation - 30 $158,000) 19970S0186B0179 - 4 -
1 (Land Allocation - $10,000) 2 (Design and Contingencies - $30,000) 3 (5) Shaler Township, South of Martha 4 Avenue, Anderson Road over Wible Run, 5 Bridge Replacement 500,000 6 (Base Construction Allocation - 7 $400,000) 8 (Design and Contingencies - $100,000) 9 (6) Baldwin Borough, Old Clairton Road 10 over CSX Railroad, Bridge 11 Rehabilitation 80,000 12 (Base Construction Allocation - 13 $65,000) 14 (Design and Contingencies - $15,000) 15 (7) Ben Avon Borough, Spruce Run Road over 16 Spruce Run, Bridge Rehabilitation 265,000 17 (Base Construction Allocation - 18 $200,000) 19 (Land Allocation - $5,000) 20 (Design and Contingencies - $60,000) 21 (8) City of Pittsburgh, Swinburne Street, 22 Bridge Painting 1,530,000 23 (Base Construction Allocation - 24 $1,500,000) 25 (Design and Contingencies - $30,000) 26 (9) City of Pittsburgh, Railroad Bridge 27 (Hot Metal Bridge) at Former LTV Steel 28 Company over Monongahela River, Bridge 29 Rehabilitation 25,000,000 30 (Base Construction Allocation - 19970S0186B0179 - 5 -
1 $22,500,000) 2 (Design and Contingencies - $2,500,000) 3 (10) Edgeworth Borough, Beaver Street over 4 Little Sewickley Creek, Bridge 5 Replacement 358,000 6 (Base Construction Allocation - 7 $250,000) 8 (Land Allocation - $8,000) 9 (Design and Contingencies - $100,000) 10 (11) Forward Township, Pangburn Hollow 11 Road over Pangburn Run, Bridge 12 Replacement 200,000 13 (Base Construction Allocation - 14 $150,000) 15 (Land Allocation - $10,000) 16 (Design and Contingencies - $40,000) 17 (12) Hampton Township, Duncan Avenue over 18 Pine Creek, Bridge Replacement 200,000 19 (Base Construction Allocation - 20 $150,000) 21 (Land Allocation - $10,000) 22 (Design and Contingencies - $40,000) 23 (13) Harrison Township, Natrona Road over 24 Small Branch of Allegheny River, Bridge 25 Rehabilitation 210,000 26 (Base Construction Allocation - 27 $160,000) 28 (Land Allocation - $10,000) 29 (Design and Contingencies - $40,000) 30 (14) Jefferson Borough, Coal Valley Road 19970S0186B0179 - 6 -
1 Bridge No.2 over McRoberts Run, Bridge 2 Rehabilitation 200,000 3 (Base Construction Allocation - 4 $150,000) 5 (Land Allocation - $10,000) 6 (Design and Contingencies - $40,000) 7 (15) Jefferson Borough, Coal Valley Road 8 Bridge No.4 over McRoberts Run, Bridge 9 Rehabilitation 200,000 10 (Base Construction Allocation - 11 $150,000) 12 (Land Allocation - $10,000) 13 (Design and Contingencies - $40,000) 14 (16) Leetsdale Borough, Beaver Road over 15 Big Sewickley Creek, Bridge 16 Replacement 420,000 17 (Base Construction Allocation - 18 $300,000) 19 (Land Allocation - $10,000) 20 (Design and Contingencies - $110,000) 21 (17) Municipality of Penn Hills, Mt. 22 Carmel Road over Sandy Creek, Bridge 23 Replacement 230,000 24 (Base Construction Allocation - 25 $170,000) 26 (Land Allocation - $10,000) 27 (Design and Contingencies - $50,000) 28 (18) Municipality of Penn Hills, Lincoln 29 Road Bridge No.6 over Sandy Creek, 30 Bridge Replacement 215,000 19970S0186B0179 - 7 -
1 (Base Construction Allocation - 2 $150,000) 3 (Land Allocation - $5,000) 4 (Design and Contingencies - $60,000) 5 (19) Municipality of Penn Hills, Lincoln 6 Road Bridge No.12 over Sandy Creek, 7 Bridge Replacement 215,000 8 (Base Construction Allocation - 9 $150,000) 10 (Land Allocation - $5,000) 11 (Design and Contingencies - $60,000) 12 (20) Sewickley Heights Borough, Blackburn 13 Road over Kilbuck Run, Bridge 14 Rehabilitation 145,000 15 (Base Construction Allocation - 16 $110,000) 17 (Land Allocation - $5,000) 18 (Design and Contingencies - $30,000) 19 (21) South Park Township, Sleepy Hollow 20 Road over Sleepy Hollow, Bridge 21 Replacement 295,000 22 (Base Construction Allocation - 23 $200,000) 24 (Land Allocation - $5,000) 25 (Design and Contingencies - $90,000) 26 (22) South Park Township, Cochran's Mill 27 Road over Licks Run, Bridge 28 Replacement 215,000 29 (Base Construction Allocation - 30 $150,000) 19970S0186B0179 - 8 -
1 (Land Allocation - $5,000) 2 (Design and Contingencies - $60,000) 3 (23) Hampton Township, T-357, Bridge over 4 Gourdhead Run, Bridge Rehabilitation 320,000 5 (Base Construction Allocation - 6 $280,000) 7 (Design and Contingencies - $40,000) 8 (24) Hampton Township, T-984, South 9 Pioneer Road Bridge No.1 over Crouse 10 Run, Bridge Rehabilitation 250,000 11 (Base Construction Allocation - 12 $210,000) 13 (Design and Contingencies - $40,000) 14 (25) Hampton Township, T-984, South 15 Pioneer Road Bridge No.2 over Crouse 16 Run, Bridge Rehabilitation 250,000 17 (Base Construction Allocation - 18 $210,000) 19 (Design and Contingencies - $40,000) 20 (26) Marshall Township, T-482, Northgate 21 Drive Bridge over Brush Creek, Bridge 22 Replacement 320,000 23 (Base Construction Allocation - 24 $280,000) 25 (Land Allocation - $5,000) 26 (Design and Contingencies - $35,000) 27 (27) Town of McCandless, Blazier Drive 28 Bridge No.1 over Pine Creek, Bridge 29 Rehabilitation 17,000 30 (Base Construction Allocation - 19970S0186B0179 - 9 -
1 $15,000) 2 (Design and Contingencies - $2,000) 3 (28) Town of McCandless, Blazier Drive 4 Bridge No.2 over Pine Creek, Bridge 5 Rehabilitation 28,000 6 (Base Construction Allocation - 7 $26,000) 8 (Design and Contingencies - $2,000) 9 (29) Town of McCandless, Blazier Drive 10 Bridge No.3 over Pine Creek, Bridge 11 Rehabilitation 3,000 12 (Base Construction Allocation - $2,000) 13 (Design and Contingencies - $1,000) 14 (30) Town of McCandless, Oakridge Drive 15 over Pine Creek, Bridge Rehabilitation 10,000 16 (Base Construction Allocation - $8,000) 17 (Design and Contingencies - $2,000) 18 (31) Town of McCandless, Meinert Road over 19 Pine Creek, Bridge Rehabilitation 3,000 20 (Base Construction Allocation - $2,000) 21 (Design and Contingencies - $1,000) 22 (32) Collier Township, Thom's Run Road- 23 Oakdale Road No.4 over Thom's Run, 24 Bridge Replacement 210,000 25 (Base Construction Allocation - 26 $160,000) 27 (Land Allocation - $10,000) 28 (Design and Contingencies - $40,000) 29 (33) Collier Township, Thom's Run Road- 30 Oakdale Road No.5 over Thom's Run, 19970S0186B0179 - 10 -
1 Bridge Replacement 210,000 2 (Base Construction Allocation - 3 $160,000) 4 (Land Allocation - $10,000) 5 (Design and Contingencies - $40,000) 6 (34) Collier Township, Thom's Run Road- 7 Oakdale Road No.9 over Thom's Run, 8 Bridge Replacement 180,000 9 (Base Construction Allocation - 10 $130,000) 11 (Land Allocation - $10,000) 12 (Design and Contingencies - $40,000) 13 (35) Etna Borough, Dewey Street over 14 Little Pine Creek, Bridge 15 Rehabilitation 23,000 16 (Base Construction Allocation - 17 $20,000) 18 (Design and Contingencies - $3,000) 19 (36) Forward Township, Roberts Hollow Road 20 over Fallen Timber Run, Bridge 21 Replacement 200,000 22 (Base Construction Allocation - 23 $160,000) 24 (Land Allocation - $10,000) 25 (Design and Contingencies - $30,000) 26 (37) Hampton Township, Duncan Avenue over 27 Stillhouse Run, Bridge Replacement 230,000 28 (Base Construction Allocation - 29 $170,000) 30 (Land Allocation - $10,000) 19970S0186B0179 - 11 -
1 (Design and Contingencies - $50,000) 2 (38) Penn Hills Township, Lincoln Road 3 over Ryans Run, Bridge Replacement 190,000 4 (Base Construction Allocation - 5 $140,000) 6 (Land Allocation - $10,000) 7 (Design and Contingencies - $40,000) 8 (39) Penns Hills Township, Lincoln Road 9 over Sandy Creek, Bridge Replacement 195,000 10 (Base Construction Allocation - 11 $150,000) 12 (Land Allocation - $5,000) 13 (Design and Contingencies - $40,000) 14 (40) North Versailles Township, Crooked 15 Run Road over Crooked Run, Bridge 16 Replacement 170,000 17 (Base Construction Allocation - 18 $130,000) 19 (Land Allocation - $10,000) 20 (Design and Contingencies - $30,000) 21 (41) O'Hara Township, Brownhill Road over 22 Little Pine Creek, Bridge Replacement 275,000 23 (Base Construction Allocation - 24 $231,000) 25 (Design and Contingencies - $44,000) 26 (42) Ross Township, Thompson Run Road over 27 South Branch of Pine Creek, Bridge 28 Replacement 210,000 29 (Base Construction Allocation - 30 $160,000) 19970S0186B0179 - 12 -
1 (Land Allocation - $8,000) 2 (Design and Contingencies - $42,000) 3 (43) Moon Township, T-114, Becks Run Road 4 over Flaugherty Run, Bridge 5 Replacement 420,000 6 (Base Construction Allocation - 7 $350,000) 8 (Land Allocation - $20,000) 9 (Design and Contingencies - $50,000) 10 (b) State Bridges 11 (1) SR 0028, Etna Bridge, Northbound 12 Bridge No.4 to Existing SR 0028, Etna 13 Borough, Shaler Township, Sharpsburg 14 Borough and O'Hara Township, Bridge 15 Rehabilitation 7,415,000 16 (Base Construction Allocation - 17 $7,115,000) 18 (Land Allocation - $300,000) 19 (2) SR 0028, Etna Bridge to 62nd Street 20 Bridge, Etna Borough, Shaler Township, 21 Sharpsburg Borough and O'Hara Township, 22 Bridge Rehabilitation 17,222,000 23 (Base Construction Allocation - 24 $17,022,000) 25 (Land Allocation - $200,000) 26 (3) SR 0030, Ardmore Westbound Electric 27 over SR 2112, Chalfant Borough, Bridge 28 Replacement 3,100,000 29 (Base Construction Allocation - 30 $3,000,000) 19970S0186B0179 - 13 -
1 (Design and Contingencies - $100,000) 2 (4) SR 0030, Ardmore Eastbound Electric 3 over SR 2112, Chalfant Borough, Bridge 4 Replacement 2,500,000 5 (Base Construction Allocation - 6 $2,400,000) 7 (Design and Contingencies - $100,000) 8 (5) SR 0030, Ardmore Boulevard Bridge No.1 9 over Falls Run, North of SR 8012 10 Interchange, Forest Hills Borough, 11 Bridge Replacement 550,000 12 (Base Construction Allocation - 13 $400,000) 14 (Land Allocation - $50,000) 15 (Design and Contingencies - $100,000) 16 (6) SR 0048, Boston Hollow Road Bridge 17 over Unnamed Stream, North of Lincoln 18 Borough, Elizabeth Borough, Bridge 19 Replacement 340,000 20 (Base Construction Allocation - 21 $200,000) 22 (Land Allocation - $40,000) 23 (Design and Contingencies - $100,000) 24 (7) SR 0050, Bridge over Chartiers Creek, 25 Northbound Lane, Heidelberg Borough, 26 Scott Township, Bridge Rehabilitation 3,750,000 27 (Base Construction Allocation - 28 $3,300,000) 29 (Land Allocation - $50,000) 30 (Design and Contingencies - $400,000) 19970S0186B0179 - 14 -
1 (8) SR 0060, South Main Street Bridge over 2 Saw Mill Run, South of West End Circle, 3 City of Pittsburgh, Bridge Painting 178,000 4 (Base Construction Allocation - 5 $173,000) 6 (Design and Contingencies - $5,000) 7 (9) SR 0130, Tri-Borough Extended Bridge 8 over Patton Street at SR 8076 9 Interchange, Wilmerding Borough, Bridge 10 Rehabilitation 505,000 11 (Base Construction Allocation - 12 $400,000) 13 (Land Allocation - $30,000) 14 (Design and Contingencies - $75,000) 15 (10) SR 0148, Bridge over Crooked Run 16 Creek near SR 2037, White Oak Borough, 17 Bridge Replacement 350,000 18 (Base Construction Allocation - 19 $200,000) 20 (Land Allocation - $50,000) 21 (Design and Contingencies - $100,000) 22 (11) SR 0791, Bridge over Chalfont Run at 23 SR 2048, Wilkins Township, Bridge 24 Replacement 450,000 25 (Base Construction Allocation - 26 $300,000) 27 (Land Allocation - $50,000) 28 (Design and Contingencies - $100,000) 29 (12) SR 0837, Northbound Ramp A to SR 0885 30 Southbound, City of Pittsburgh, Bridge 19970S0186B0179 - 15 -
1 Rehabilitation 1,350,000 2 (Base Construction Allocation - 3 $1,250,000) 4 (Design and Contingencies - $100,000) 5 (13) SR 0978, Miller's Run Road Bridge 6 over Dolphin Run, South Fayette 7 Township, Bridge Replacement 300,000 8 (Base Construction Allocation - 9 $200,000) 10 (Design and Contingencies - $100,000) 11 (14) SR 1001, West 7th Avenue Bridge over 12 Bull Creek, Tarentum Borough, Bridge 13 Replacement 400,000 14 (Base Construction Allocation - 15 $300,000) 16 (Design and Contingencies - $100,000) 17 (15) SR 1011, Guys Run Road Bridge over 18 Guys Run, North of SR 0028, Harmar 19 Township, Bridge Replacement 350,000 20 (Base Construction Allocation - 21 $200,000) 22 (Land Allocation - $50,000) 23 (Design and Contingencies - $100,000) 24 (16) SR 2001, Glassport-Elizabeth Road 25 Bridge over Burns Run, North of 26 Elizabeth Township, Lincoln Borough, 27 Bridge Replacement 350,000 28 (Base Construction Allocation - 29 $200,000) 30 (Land Allocation - $50,000) 19970S0186B0179 - 16 -
1 (Design and Contingencies - $100,000) 2 (17) SR 2081, Turtle Creek-Monroeville 3 Road over US 22 Business, Monroeville 4 Borough, Bridge Replacement 1,060,000 5 (Base Construction Allocation - 6 $960,000) 7 (Design and Contingencies - $100,000) 8 (18) SR 2094, Jerome Street Bridge over SR 9 2027, Youghiogheny River, McKeesport 10 Borough, Bridge Rehabilitation 4,600,000 11 (Base Construction Allocation - 12 $4,500,000) 13 (Design and Contingencies - $100,000) 14 (19) SR 3066, Steubenville Pike Bridge 15 over US 22, North Fayette Township, 16 Bridge Rehabilitation 500,000 17 (Base Construction Allocation - 18 $400,000) 19 (Land Allocation - $25,000) 20 (Design and Contingencies - $75,000) 21 (20) SR 3069, Liberty Tunnel Airshaft 22 between SR 0051 and Liberty Bridge, 23 City of Pittsburgh, Airshaft 24 Restoration 1,570,000 25 (Base Construction Allocation - 26 $1,370,000) 27 (Design and Contingencies - $200,000) 28 (21) SR 3104, McKees Rocks Sidewalk over 29 Harriet Street, McKees Rocks Borough, 30 Bridge Rehabilitation 6,800,000 19970S0186B0179 - 17 -
1 (Base Construction Allocation - 2 $6,700,000) 3 (Design and Contingencies - $100,000) 4 (22) SR 4036, Big Sewickley Creek Road 5 over Big Sewickley Creek at SR 2003, 6 Bell Acres Borough, Bridge 7 Rehabilitation 500,000 8 (Base Construction Allocation - 9 $400,000) 10 (Land Allocation - $25,000) 11 (Design and Contingencies - $75,000) 12 (23) SR 8043, Southbound Ramp Bridge over 13 SR 0019 and SR 0065, City of 14 Pittsburgh, Bridge Rehabilitation 2,400,000 15 (Base Construction Allocation - 16 $2,100,000) 17 (Land Allocation - $50,000) 18 (Design and Contingencies - $250,000) 19 (24) SR 8045, Ramp at Stadium over SR 0065 20 and Stadium Drive, City of Pittsburgh, 21 Bridge Rehabilitation 600,000 22 (Base Construction Allocation - 23 $600,000) 24 (25) SR 8049, SR 0019 Bridge Ramp, Chateau 25 Street to SR 0019, City of Pittsburgh, 26 Bridge Rehabilitation 2,350,000 27 (Base Construction Allocation - 28 $2,000,000) 29 (Land Allocation - $50,000) 30 (Design and Contingencies - $300,000) 19970S0186B0179 - 18 -
1 (26) SR 8049, Bridge Ramp from SR 0065 2 Northbound to SR 0019, City of 3 Pittsburgh, Bridge Rehabilitation 2,850,000 4 (Base Construction Allocation - 5 $2,500,000) 6 (Land Allocation - $50,000) 7 (Design and Contingencies - $300,000) 8 (27) SR 8049, I-279 Bridge Ramp to SR 0065 9 Northbound, City of Pittsburgh, Bridge 10 Rehabilitation 1,730,000 11 (Base Construction Allocation - 12 $1,500,000) 13 (Land Allocation - $30,000) 14 (Design and Contingencies - $200,000) 15 (28) SR 0030, Ardmore Boulevard Bridge 16 No.2 over Falls Run, North of SR 8012 17 Interchange, Forest Hills Borough, 18 Bridge Replacement 550,000 19 (Base Construction Allocation - 20 $400,000) 21 (Land Allocation - $50,000) 22 (Design and Contingencies - $100,000) 23 (29) SR 3004, McLaughlin Road Bridge over 24 McLaughlin Run, Bridgeville Borough, 25 Bridge Replacement 227,000 26 (Base Construction Allocation - 27 $177,000) 28 (Land Allocation - $10,000) 29 (Design and Contingencies - $40,000) 30 (30) SR 0028, Northbound Bridge over 19970S0186B0179 - 19 -
1 Pennsylvania Turnpike, Harmar Township, 2 Bridge Rehabilitation 344,000 3 (Base Construction Allocation - 4 $314,000) 5 (Design and Contingencies - $30,000) 6 (31) SR 0028, Southbound Bridge over 7 Pennsylvania Turnpike, Harmar Township, 8 Bridge Rehabilitation 356,000 9 (Base Construction Allocation - 10 $325,000) 11 (Design and Contingencies - $31,000) 12 (32) SR 0028, Northbound Bridge over SR 13 1028, Harrison Township, Bridge 14 Rehabilitation 106,000 15 (Base Construction Allocation - 16 $97,000) 17 (Design and Contingencies - $9,000) 18 (33) SR 0028, Southbound Bridge over SR 19 1028, Harrison Township, Bridge 20 Rehabilitation 105,000 21 (Base Construction Allocation - 22 $96,000) 23 (Design and Contingencies - $9,000) 24 (34) SR 0050, Washington Avenue Bridge 25 over Chartiers Creek, Bridgeville 26 Borough, Bridge Rehabilitation 119,000 27 (Base Construction Allocation - 28 $109,000) 29 (Design and Contingencies - $10,000) 30 (35) SR 0051, Clairton Boulevard Bridge 19970S0186B0179 - 20 -
1 over Lewis Run, Pleasant Hills Borough, 2 Bridge Replacement 600,000 3 (Base Construction Allocation - 4 $500,000) 5 (Design and Contingencies - $100,000) 6 (36) SR 0065, Ohio River Boulevard Bridge 7 over Forest Avenue, Ben Avon Borough, 8 Bridge Replacement 396,000 9 (Base Construction Allocation - 10 $360,000) 11 (Design and Contingencies - $36,000) 12 (37) SR 0065, Bridge over Ramps, Railroad 13 and Chateau Street, City of Pittsburgh, 14 Bridge Rehabilitation 13,284,000 15 (Base Construction Allocation - 16 $12,784,000) 17 (Design and Contingencies - $500,000) 18 (38) SR 0079, Neville Island Bridge over 19 Ohio River, Neville Township, Bridge 20 Rehabilitation 12,700,000 21 (Base Construction Allocation - 22 $11,200,000) 23 (Design and Contingencies - $1,500,000) 24 (39) SR 0088, Library Road Bridge No.1 25 over Piney Fork Creek, Bethel Park 26 Borough, Bridge Replacement 161,000 27 (Base Construction Allocation - 28 $128,000) 29 (Land Allocation - $20,000) 30 (Design and Contingencies - $13,000) 19970S0186B0179 - 21 -
1 (40) SR 0088, Library Road Bridge No.2 2 over Branch of Piney Fork Creek, Bethel 3 Park Borough, Bridge Replacement 161,000 4 (Base Construction Allocation - 5 $128,000) 6 (Land Allocation - $20,000) 7 (Design and Contingencies - $13,000) 8 (41) SR 0885, Mifflin Road Bridge over 9 Branch of Streets Run, City of 10 Pittsburgh, Bridge Replacement 600,000 11 (Base Construction Allocation - 12 $500,000) 13 (Design and Contingencies - $100,000) 14 (42) SR 0910, Gibsonia Road Bridge over 15 Rawlins Run, Indiana Township, Bridge 16 Deck Replacement 132,000 17 (Base Construction Allocation - 18 $120,000) 19 (Design and Contingencies - $12,000) 20 (43) SR 1027, Pleasantville Road Bridge 21 over Little Bull Creek, Harrison 22 Township, Bridge Replacement 400,000 23 (Base Construction Allocation - 24 $300,000) 25 (Design and Contingencies - $100,000) 26 (44) SR 1032, Burtner Road Bridge over 27 Little Bull Creek, Harrison Township, 28 Bridge Deck Replacement 198,000 29 (Base Construction Allocation - 30 $180,000) 19970S0186B0179 - 22 -
1 (Design and Contingencies - $18,000) 2 (45) SR 2008, Lovedale Road Bridge over 3 Wylie Run Creek, Elizabeth Township, 4 Bridge Replacement 430,000 5 (Base Construction Allocation - 6 $300,000) 7 (Land Allocation - $30,000) 8 (Design and Contingencies - $100,000) 9 (46) SR 2017, Pineview Drive Bridge No.1 10 over Gillespie Run, Elizabeth Township, 11 Bridge Deck Replacement 255,000 12 (Base Construction Allocation - 13 $135,000) 14 (Land Allocation - $20,000) 15 (Design and Contingencies - $100,000) 16 (47) SR 2017, Pineview Drive Bridge No.2 17 over Gillespie Run, Elizabeth Township, 18 Bridge Deck Replacement 243,000 19 (Base Construction Allocation - 20 $123,000) 21 (Land Allocation - $20,000) 22 (Design and Contingencies - $100,000) 23 (48) SR 2018, West Smithfield Road Bridge 24 over Unnamed Creek, Elizabeth Township, 25 Bridge Deck Replacement 218,000 26 (Base Construction Allocation - 27 $118,000) 28 (Design and Contingencies - $100,000) 29 (49) SR 2031, Lincoln Way Bridge over Long 30 Run, White Oak Borough, Bridge 19970S0186B0179 - 23 -
1 Replacement 600,000 2 (Base Construction Allocation - 3 $500,000) 4 (Design and Contingencies - $100,000) 5 (50) SR 2051, Brinton Road Bridge over I- 6 376, Edgewood Borough, Bridge 7 Rehabilitation 996,000 8 (Base Construction Allocation - 9 $846,000) 10 (Design and Contingencies - $150,000) 11 (51) SR 4019, Mount Royal Boulevard Bridge 12 over Pine Creek, Hampton Township, 13 Bridge Rehabilitation 94,000 14 (Base Construction Allocation - 15 $89,000) 16 (Design and Contingencies - $5,000) 17 (52) SR 4043, Big Sewickley Road Bridge 18 over Branch of Big Sewickley Creek, 19 Franklin Park Borough, Bridge 20 Replacement 84,000 21 (Base Construction Allocation - 22 $76,000) 23 (Design and Contingencies - $8,000) 24 (53) SR 8002, Crosstown Boulevard Bridge 25 over Forbes and Diamond Street and 26 Ramps, City of Pittsburgh, Bridge 27 Painting 310,000 28 (Base Construction Allocation - 29 $300,000) 30 (Design and Contingencies - $10,000) 19970S0186B0179 - 24 -
1 (54) SR 8002, Ramp L Road Bridge over 2 Forbes and Diamond Streets, City of 3 Pittsburgh, Bridge Painting 110,000 4 (Base Construction Allocation - 5 $100,000) 6 (Design and Contingencies - $10,000) 7 (55) SR 8015, Ramp D Road Bridge over Ohio 8 River Back Channel, Neville Township, 9 Bridge Rehabilitation 800,000 10 (Base Construction Allocation - 11 $700,000) 12 (Design and Contingencies - $100,000) 13 (56) SR 8015, Ramp E Road Bridge over PC&Y 14 Railroad, Neville Township, Bridge 15 Rehabilitation 670,000 16 (Base Construction Allocation - 17 $500,000) 18 (Design and Contingencies - $170,000) 19 (57) SR 8015, I-79 Ramp H Bridge over PC&Y 20 Railroad, Neville Township, Bridge 21 Rehabilitation 700,000 22 (Base Construction Allocation - 23 $600,000) 24 (Design and Contingencies - $100,000) 25 (58) SR 8015, Ramp J Road Bridge over 26 Neville Road, Neville Township, Bridge 27 Rehabilitation 220,000 28 (Base Construction Allocation - 29 $200,000) 30 (Design and Contingencies - $20,000) 19970S0186B0179 - 25 -
1 (59) SR 8017, Ramp B2 Road Bridge over SR 2 4025 and SR 4033, Glenfield Borough, 3 Bridge Rehabilitation 110,000 4 (Base Construction Allocation - 5 $100,000) 6 (Design and Contingencies - $10,000) 7 (60) SR 8017, Ramp B Road Bridge over Ramp 8 A and SR 4033, Glenfield Borough, 9 Bridge Rehabilitation 120,000 10 (Base Construction Allocation - 11 $110,000) 12 (Design and Contingencies - $10,000) 13 (61) SR 8017, Ramp B1 Road Bridge over SR 14 0065 Ramps A1 and R, Glenfield Borough, 15 Bridge Rehabilitation 165,000 16 (Base Construction Allocation - 17 $150,000) 18 (Design and Contingencies - $15,000) 19 (62) SR 8017, Ramp A Road Bridge over Ramp 20 B3, Glenfield Borough, Bridge 21 Rehabilitation 110,000 22 (Base Construction Allocation - 23 $100,000) 24 (Design and Contingencies - $10,000) 25 Section 7. Armstrong County. 26 (a) Local Bridges 27 (1) Boggs Township, T-850, Scrubgrass 28 Bridge over Scrubgrass Creek, Bridge 29 Rehabilitation 230,000 30 (Base Construction Allocation - 19970S0186B0179 - 26 -
1 $170,000) 2 (Land Allocation - $10,000) 3 (Design and Contingencies - $50,000) 4 (2) Boggs Township, T-632, Scrubgrass 5 Bridge No.2 over Scrubgrass Creek, 6 Bridge Rehabilitation 185,000 7 (Base Construction Allocation - 8 $150,000) 9 (Land Allocation - $10,000) 10 (Design and Contingencies - $25,000) 11 (3) Boggs Township, T-821, Pine Creek 12 Bridge over North Fork of Pine Creek, 13 Bridge Rehabilitation 140,000 14 (Base Construction Allocation - 15 $100,000) 16 (Land Allocation - $10,000) 17 (Design and Contingencies - $30,000) 18 (4) North Buffalo Township, T-300, Blaine 19 Bridge over Buffalo Creek, Bridge 20 Replacement 500,000 21 (Base Construction Allocation - 22 $400,000) 23 (Land Allocation - $20,000) 24 (Design and Contingencies - $80,000) 25 (5) North Buffalo Township, T-414, Church 26 Road Bridge over Stream, Bridge 27 Replacement 150,000 28 (Base Construction Allocation - 29 $100,000) 30 (Land Allocation - $10,000) 19970S0186B0179 - 27 -
1 (Design and Contingencies - $40,000) 2 (6) West Kittanning Borough, T-759, Bridge 3 over Stream, Bridge Replacement 325,000 4 (Base Construction Allocation - 5 $265,000) 6 (Land Allocation - $10,000) 7 (Design and Contingencies - $50,000) 8 (b) State Bridges 9 (1) SR 0028, Buffalo Creek Bridge over 10 Buffalo Creek and Conrail, South 11 Buffalo Township, Bridge Painting 3,010,000 12 (Base Construction Allocation - 13 $3,000,000) 14 (Design and Contingencies - $10,000) 15 (2) SR 3023, Iron Bridge Road, Pine Run 16 Bridge Replacement, South Buffalo 17 Township, Bridge Replacement 550,000 18 (Base Construction Allocation - 19 $510,000) 20 (Land Allocation - $20,000) 21 (Design and Contingencies - $20,000) 22 (3) SR 0156, Long Run Bridge over Long 23 Run, Kiskiminetas Township, Bridge 24 Painting 75,000 25 (Base Construction Allocation - 26 $60,000) 27 (Design and Contingencies - $15,000) 28 (4) SR 0422, US 422 Eastbound Overpass 29 Bridge over SR 0028, East Franklin 30 Township, Bridge Painting 190,000 19970S0186B0179 - 28 -
1 (Base Construction Allocation - 2 $175,000) 3 (Design and Contingencies - $15,000) 4 (5) SR 0422, US 422 Westbound Overpass 5 Bridge over SR 0028, East Franklin 6 Township, Bridge Painting 190,000 7 (Base Construction Allocation - 8 $175,000) 9 (Design and Contingencies - $15,000) 10 (6) SR 1028, Oscar Bridge over Pine Creek, 11 Boggs Township, Bridge Painting 95,000 12 (Base Construction Allocation - 13 $80,000) 14 (Design and Contingencies - $15,000) 15 (7) SR 0028, Buffalo Creek Bridge over 16 Buffalo Creek, South Buffalo Township, 17 Bridge Painting 1,730,000 18 (Base Construction Allocation - 19 $1,700,000) 20 (Design and Contingencies - $30,000) 21 (8) SR 0066, Guffy Run Bridge over Guffy 22 Run, Parks Township, Bridge Painting 85,000 23 (Base Construction Allocation - 24 $70,000) 25 (Design and Contingencies - $15,000) 26 (9) SR 0066, Garrett's Run Bridge over 27 Garrett's Run and Old 66, Manor 28 Township, Bridge Painting 1,230,000 29 (Base Construction Allocation - 30 $1,200,000) 19970S0186B0179 - 29 -
1 (Design and Contingencies - $30,000) 2 (10) SR 0128, Cadogan Bridge over 3 Tributary of Allegheny River, Cadogan 4 Township, Bridge Painting 380,000 5 (Base Construction Allocation - 6 $360,000) 7 (Design and Contingencies - $20,000) 8 (11) SR 0422, Judge Graff Bridge over 9 Allegheny River, North Buffalo 10 Township, Bridge Painting 2,930,000 11 (Base Construction Allocation - 12 $2,900,000) 13 (Design and Contingencies - $30,000) 14 (12) SR 0422, Ramp C and F Bridge over End 15 of Bypass, Manor Township, Bridge 16 Painting 180,000 17 (Base Construction Allocation - 18 $165,000) 19 (Design and Contingencies - $15,000) 20 (13) SR 0422, Ramp F Bridge over SR 0066, 21 Manor Township, Bridge Painting 190,000 22 (Base Construction Allocation - 23 $175,000) 24 (Design and Contingencies - $15,000) 25 (14) SR 1021, Eddyville Bridge over Pine 26 Run, Redbank Township, Bridge Painting 100,000 27 (Base Construction Allocation - 28 $85,000) 29 (Design and Contingencies - $15,000) 30 (15) SR 1028, Bryan Bridge over Branch of 19970S0186B0179 - 30 -
1 Pine Creek, Cowanshannock Township, 2 Bridge Painting 50,000 3 (Base Construction Allocation - 4 $35,000) 5 (Design and Contingencies - $15,000) 6 (16) SR 1034, Mosgrove Bridge over North 7 Fork of Pine Creek, Boggs Township, 8 Bridge Painting 65,000 9 (Base Construction Allocation - 10 $50,000) 11 (Design and Contingencies - $15,000) 12 (17) SR 1037, Echo Bridge over Pine Creek, 13 Wayne Township, Bridge Painting 85,000 14 (Base Construction Allocation - 15 $70,000) 16 (Design and Contingencies - $15,000) 17 (18) SR 2001, Rural Valley Bridge over 18 Cowanshannock Creek, Rural Valley 19 Borough, Bridge Painting 130,000 20 (Base Construction Allocation - 21 $115,000) 22 (Design and Contingencies - $15,000) 23 (19) SR 2005, Brick Church Bridge over 24 Branch of Cherry Run, Burrell Township, 25 Bridge Painting 75,000 26 (Base Construction Allocation - 27 $60,000) 28 (Design and Contingencies - $15,000) 29 (20) SR 2005, Cherry Run Bridge over 30 Cherry Run, Plumcreek Township, Bridge 19970S0186B0179 - 31 -
1 Painting 85,000 2 (Base Construction Allocation - 3 $70,000) 4 (Design and Contingencies - $15,000) 5 (21) SR 2005, Elgin Cemetery Bridge over 6 Cowanshannock Creek, Cowanshannock 7 Township, Bridge Painting 85,000 8 (Base Construction Allocation - 9 $70,000) 10 (Design and Contingencies - $15,000) 11 (22) SR 2010, Garrett's Run Bridge over 12 Garrett's Run, Manor Township, Bridge 13 Painting 75,000 14 (Base Construction Allocation - 15 $60,000) 16 (Design and Contingencies - $15,000) 17 (23) SR 2023, Wheel-in-Campground Bridge 18 over Plum Creek, Plumcreek Township, 19 Bridge Painting 125,000 20 (Base Construction Allocation - 21 $110,000) 22 (Design and Contingencies - $15,000) 23 (24) SR 2025, Garrett's Run Bridge No.1 24 over Garrett's Run, Manor Township, 25 Bridge Painting 80,000 26 (Base Construction Allocation - 27 $65,000) 28 (Design and Contingencies - $15,000) 29 (25) SR 2025, Garrett's Run Bridge No.2 30 over Garrett's Run, Manor Township, 19970S0186B0179 - 32 -
1 Bridge Painting 80,000 2 (Base Construction Allocation - 3 $65,000) 4 (Design and Contingencies - $15,000) 5 (26) SR 2025, Garrett's Run Bridge No.3 6 over Garrett's Run, Manor Township, 7 Bridge Painting 90,000 8 (Base Construction Allocation - 9 $75,000) 10 (Design and Contingencies - $15,000) 11 (27) SR 2027, Girty Bridge over Crooked 12 Creek, South Bend Township, Bridge 13 Painting 155,000 14 (Base Construction Allocation - 15 $140,000) 16 (Design and Contingencies - $15,000) 17 (28) SR 2029, Kelly's Station Road Bridge 18 over Taylor Run, Bethel Township, 19 Bridge Painting 60,000 20 (Base Construction Allocation - 21 $45,000) 22 (Design and Contingencies - $15,000) 23 (29) SR 2036, Stilt's Run Bridge over 24 Stilt's Run, Parks Township, Bridge 25 Painting 50,000 26 (Base Construction Allocation - 27 $35,000) 28 (Design and Contingencies - $15,000) 29 (30) SR 2036, Carnahan Run Bridge over 30 Carnahan Run, Parks Township, Bridge 19970S0186B0179 - 33 -
1 Painting 75,000 2 (Base Construction Allocation - 3 $60,000) 4 (Design and Contingencies - $15,000) 5 (31) SR 2050, Rattling Run Bridge over 6 Rattling Run, Kiskiminetas Township, 7 Bridge Painting 65,000 8 (Base Construction Allocation - 9 $50,000) 10 (Design and Contingencies - $15,000) 11 (32) SR 2051, Flat Run Bridge over Flat 12 Run, Kiskiminetas Township, Bridge 13 Painting 55,000 14 (Base Construction Allocation - 15 $40,000) 16 (Design and Contingencies - $15,000) 17 (33) SR 2051, Equitable Bridge over 18 Rattling Run, Kiskiminetas Township, 19 Bridge Painting 55,000 20 (Base Construction Allocation - 21 $40,000) 22 (Design and Contingencies - $15,000) 23 (34) SR 2057, Parks Pump Station Bridge 24 No.1 over Carnahan Run, Parks Township, 25 Bridge Painting 80,000 26 (Base Construction Allocation - 27 $65,000) 28 (Design and Contingencies - $15,000) 29 (35) SR 2058, Parks Pump Station Bridge 30 No.2 over Carnahan Run, Parks Township, 19970S0186B0179 - 34 -
1 Bridge Painting 75,000 2 (Base Construction Allocation - 3 $60,000) 4 (Design and Contingencies - $15,000) 5 (36) SR 3005, Glade Run Bridge over Glade 6 Run, North Buffalo Township, Bridge 7 Painting 75,000 8 (Base Construction Allocation - 9 $60,000) 10 (Design and Contingencies - $15,000) 11 (37) SR 3013, Little Buffalo Bridge over 12 Little Buffalo Creek, West Franklin 13 Township, Bridge Painting 100,000 14 (Base Construction Allocation - 15 $85,000) 16 (Design and Contingencies - $15,000) 17 (38) SR 3013, Harrigan Run Bridge over 18 Harrigan Run, West Franklin Township, 19 Bridge Painting 60,000 20 (Base Construction Allocation - 21 $45,000) 22 (Design and Contingencies - $15,000) 23 (39) SR 3017, West Penn Power Bridge over 24 SR 0422 and SR 0028, East Franklin 25 Township, Bridge Painting 375,000 26 (Base Construction Allocation - 27 $360,000) 28 (Design and Contingencies - $15,000) 29 (40) SR 4007, Kaylor Bridge over Sugar 30 Creek, Bradys Bend Township, Bridge 19970S0186B0179 - 35 -
1 Painting 60,000 2 (Base Construction Allocation - 3 $45,000) 4 (Design and Contingencies - $15,000) 5 (41) SR 4013, Foster Mills Bridge over 6 Branch of Patterson Run, Sugarcreek 7 Township, Bridge Painting 70,000 8 (Base Construction Allocation - 9 $55,000) 10 (Design and Contingencies - $15,000) 11 (42) SR 8008, Ford City Ramp from Judge 12 Graff Bridge over a ravine, Manor 13 Township, Bridge Painting 555,000 14 (Base Construction Allocation - 15 $540,000) 16 (Design and Contingencies - $15,000) 17 (43) SR 4035, Craigsville Bridge over 18 Buffalo Creek, West Franklin Township, 19 Bridge Painting 140,000 20 (Base Construction Allocation - 21 $125,000) 22 (Design and Contingencies - $15,000) 23 (44) SR 0068, Kaylor Overpass, Railroad 24 over PA 68, Bradys Bend Township, 25 Bridge Removal 560,000 26 (Base Construction Allocation - 27 $500,000) 28 (Land Allocation - $10,000) 29 (Design and Contingencies - $50,000) 30 (45) SR 0068, B&LE Railroad Overpass, 19970S0186B0179 - 36 -
1 Bradys Bend Township, Bridge Removal 55,000 2 (Base Construction Allocation - 3 $50,000) 4 (Design and Contingencies - $5,000) 5 Section 8. Beaver County. 6 (a) Local Bridges 7 (1) Ambridge and Aliquippa Boroughs, 8 Ambridge - Aliquippa Bridge over Ohio 9 River, Bridge Construction 38,000,000 10 (Base Construction Allocation - 11 $30,000,000) 12 (Land Allocation - $4,000,000) 13 (Design and Contingencies - $4,000,000) 14 (2) Vanport Township, Vanport Bridge No.6 15 over Two Mile Run, Bridge Replacement 465,000 16 (Base Construction Allocation - 17 $375,000) 18 (Land Allocation - $10,000) 19 (Design and Contingencies - $80,000) 20 (3) Vanport Township, Vanport Bridge No.7 21 over Two Mile Run, Bridge Replacement 470,000 22 (Base Construction Allocation - 23 $380,000) 24 (Land Allocation - $10,000) 25 (Design and Contingencies - $80,000) 26 (4) Vanport Township, Vanport Bridge No.8 27 over Two Mile Run, Bridge Replacement 510,000 28 (Base Construction Allocation - 29 $420,000) 30 (Land Allocation - $10,000) 19970S0186B0179 - 37 -
1 (Design and Contingencies - $80,000) 2 (5) Vanport Township, Vanport Bridge No.9 3 over Two Mile Run, Bridge Replacement 440,000 4 (Base Construction Allocation - 5 $350,000) 6 (Land Allocation - $10,000) 7 (Design and Contingencies - $80,000) 8 (b) State Bridges 9 (1) SR 0051, Bridge over New York Avenue, 10 Ramp A, Rochester Borough, Bridge Deck 11 Replacement 5,600,000 12 (Base Construction Allocation - 13 $5,500,000) 14 (Design and Contingencies - $100,000) 15 (2) SR 0351, 5th Street, Koppel-Ellwood 16 Bridge over Beaver River, Koppel 17 Borough and North Sewickley Township, 18 Bridge Replacement, Phase I 33,500,000 19 (Base Construction Allocation - 20 $30,000,000) 21 (Land Allocation - $1,000,000) 22 (Design and Contingencies - $2,500,000) 23 (3) SR 1014, Wise's Grove Road Bridge over 24 Brush Creek, Marion Township, Bridge 25 Rehabilitation 750,000 26 (Base Construction Allocation - 27 $600,000) 28 (Land Allocation - $50,000) 29 (Design and Contingencies - $100,000) 30 (4) SR 1022, 13th Street Bridge over 19970S0186B0179 - 38 -
1 Blockhouse Run at Pulaski County Line, 2 New Brighton Borough, Bridge 3 Replacement 780,000 4 (Base Construction Allocation - 5 $480,000) 6 (Land Allocation - $50,000) 7 (Design and Contingencies - $250,000) 8 (5) SR 4032, Engle Road Bridge over Six 9 Mile Run Creek, Industry Borough, 10 Bridge Replacement 350,000 11 (Base Construction Allocation - 12 $200,000) 13 (Land Allocation - $50,000) 14 (Design and Contingencies - $100,000) 15 (6) SR 4033, Wildwood Road Bridge over 16 Brady's Run, Patterson Township, Bridge 17 Replacement 400,000 18 (Base Construction Allocation - 19 $250,000) 20 (Land Allocation - $50,000) 21 (Design and Contingencies - $100,000) 22 (7) SR 8035, Ramp A at LR 641 over Slope, 23 Rochester Borough, Bridge 24 Rehabilitation 1,200,000 25 (Base Construction Allocation - 26 $1,000,000) 27 (Land Allocation - $50,000) 28 (Design and Contingencies - $150,000) 29 (8) SR 8037, Ramp F over TR 51 and TR 65 30 Northbound, Rochester Borough, Bridge 19970S0186B0179 - 39 -
1 Replacement 550,000 2 (Base Construction Allocation - 3 $400,000) 4 (Land Allocation - $50,000) 5 (Design and Contingencies - $100,000) 6 (9) SR 8039, Ramp AD, SR 0168 over TR 51, 7 Bridgewater Borough, Bridge 8 Rehabilitation 700,000 9 (Base Construction Allocation - 10 $550,000) 11 (Land Allocation - $50,000) 12 (Design and Contingencies - $100,000) 13 (10) SR 3018, Culvert-pipe Style Bridge 14 over Moody's Run, Greene Township, 15 Bridge Construction 385,000 16 (Base Construction Allocation - 17 $350,000) 18 (Design and Contingencies - $35,000) 19 (11) SR 0051, Pennsylvania Avenue Bridge 20 over Brady's Run Creek, Fallston 21 Borough, Bridge Replacement 757,000 22 (Base Construction Allocation - 23 $637,000) 24 (Land Allocation - $20,000) 25 (Design and Contingencies - $100,000) 26 (12) SR 0060, Beaver Valley Extension 27 Southbound Bridge over T-535, Brighton 28 Township, Bridge Rehabilitation 167,000 29 (Base Construction Allocation - 30 $153,000) 19970S0186B0179 - 40 -
1 (Design and Contingencies - $14,000) 2 (13) SR 0060, Beaver Valley Extension 3 Northbound Bridge over T-535, Brighton 4 Township, Bridge Rehabilitation 178,000 5 (Base Construction Allocation - 6 $163,000) 7 (Design and Contingencies - $15,000) 8 (14) SR 0060, Beaver Valley Expansion 9 Bridge over SR 0151, Hopewell Township, 10 Bridge Deck Replacement 1,125,000 11 (Base Construction Allocation - 12 $1,000,000) 13 (Design and Contingencies - $125,000) 14 (15) SR 0588, Riverview Road Bridge over 15 Pine Run, Marion Township, Bridge 16 Replacement 250,000 17 (Base Construction Allocation - 18 $150,000) 19 (Design and Contingencies - $100,000) 20 (16) SR 1009, Hartzel Road Bridge over 21 Connoquenessing Creek, Marion Township, 22 Bridge Replacement 1,150,000 23 (Base Construction Allocation - 24 $1,000,000) 25 (Land Allocation - $50,000) 26 (Design and Contingencies - $100,000) 27 (17) SR 1016, Tatko Road Bridge over Brush 28 Creek, New Sewickley Township, Bridge 29 Replacement 420,000 30 (Base Construction Allocation - 19970S0186B0179 - 41 -
1 $300,000) 2 (Land Allocation - $20,000) 3 (Design and Contingencies - $100,000) 4 (18) SR 1032, New York Avenue Bridge over 5 Conrail, SR 1032 and Local Street, 6 Rochester Borough, Bridge 7 Rehabilitation 3,100,000 8 (Base Construction Allocation - 9 $3,000,000) 10 (Design and Contingencies - $100,000) 11 (19) SR 4035, Sebring Road Bridge over SR 12 0060, Brighton Township, Bridge 13 Rehabilitation 394,000 14 (Base Construction Allocation - 15 $361,000) 16 (Design and Contingencies - $33,000) 17 Section 9. Bedford County. 18 (a) Local Bridges 19 (1) Broad Top Township, T-550, Mosquito 20 Bridge over Six Mile Run, Bridge 21 Replacement 505,000 22 (Base Construction Allocation - 23 $400,000) 24 (Land Allocation - $10,000) 25 (Design and Contingencies - $95,000) 26 (2) Broad Top Township, T-553, Langdondale 27 Bridge over Sandy Run, Bridge 28 Replacement 395,000 29 (Base Construction Allocation - 30 $300,000) 19970S0186B0179 - 42 -
1 (Land Allocation - $10,000) 2 (Design and Contingencies - $85,000) 3 (3) Broad Top Township, T-583, Longs Run 4 Bridge over Longs Run, Bridge 5 Replacement 395,000 6 (Base Construction Allocation - 7 $300,000) 8 (Land Allocation - $10,000) 9 (Design and Contingencies - $85,000) 10 (4) Harrison Township, T-418, Turner 11 Covered Bridge over Juniata River, 12 Bridge Rehabilitation 825,000 13 (Base Construction Allocation - 14 $700,000) 15 (Land Allocation - $25,000) 16 (Design and Contingencies - $100,000) 17 (5) Monroe Township, T-354, Sideling Hill 18 over East Branch Sideling Hill Creek, 19 Bridge Replacement 335,000 20 (Base Construction Allocation - 21 $250,000) 22 (Land Allocation - $10,000) 23 (Design and Contingencies - $75,000) 24 (6) South Woodbury Township, T-705 over 25 Three Springs Run, Bridge Replacement 450,000 26 (Base Construction Allocation - 27 $325,000) 28 (Land Allocation - $50,000) 29 (Design and Contingencies - $75,000) 30 (7) West St. Clair Township, T-565 over 19970S0186B0179 - 43 -
1 Dunning Creek, Bridge Replacement 550,000 2 (Base Construction Allocation - 3 $450,000) 4 (Land Allocation - $25,000) 5 (Design and Contingencies - $75,000) 6 (8) Londonderry Township, T-653 over Wills 7 Creek, Bridge Replacement 945,000 8 (Base Construction Allocation - 9 $850,000) 10 (Land Allocation - $20,000) 11 (Design and Contingencies - $75,000) 12 (9) East Providence Township, T-419 over 13 Brush Creek, Bridge Replacement 1,170,000 14 (Base Construction Allocation - 15 $1,000,000) 16 (Land Allocation - $20,000) 17 (Design and Contingencies - $150,000) 18 (10) Broadtop Township, T-677, Riddlesburg 19 Bridge, County Bridge No.35 over Six 20 Mile Run, Bridge Replacement 190,000 21 (Base Construction Allocation - 22 $150,000) 23 (Land Allocation - $5,000) 24 Design and Contingencies - $35,000) 25 (b) State Bridges 26 (1) SR 0220, US 220, Northbound Bridge 27 over Pennsylvania Turnpike, Bedford 28 Township, Bridge Painting 180,000 29 (Base Construction Allocation - 30 $150,000) 19970S0186B0179 - 44 -
1 (Design and Contingencies - $30,000) 2 (2) SR 0220, US 220, Southbound Bridge 3 over Pennsylvania Turnpike, Bedford 4 Township, Bridge Painting 170,000 5 (Base Construction Allocation - 6 $140,000) 7 (Design and Contingencies - $30,000) 8 Section 10. Berks County. 9 (a) Local Bridges 10 (1) City of Reading, Fritz Island Bridge 11 over Angelica Creek, Bridge 12 Rehabilitation 23,000 13 (Base Construction Allocation - 14 $20,000) 15 (Design and Contingencies - $3,000) 16 (2) City of Reading, Bernadine Street over 17 Angelica Creek, Bridge Rehabilitation 175,000 18 (Base Construction Allocation - 19 $145,000) 20 (Design and Contingencies - $30,000) 21 (3) City of Reading, Tulpehocken Street 22 Footbridge, Bridge Rehabilitation 6,000 23 (Base Construction Allocation - $5,000) 24 (Design and Contingencies - $1,000) 25 (4) West Reading Borough, Museum Road over 26 Wyomissing Creek, Bridge 27 Rehabilitation 15,000 28 (Base Construction Allocation - 29 $12,000) 30 (Design and Contingencies - $3,000) 19970S0186B0179 - 45 -
1 (5) Amity Township, Lake Drive over 2 Tributary of Schuylkill River, Bridge 3 Rehabilitation 86,000 4 (Base Construction Allocation - 5 $75,000) 6 (Design and Contingencies - $11,000) 7 (6) Amity Township, Browns Mill Road over 8 Spring Creek, Bridge Rehabilitation 6,000 9 (Base Construction Allocation - $5,000) 10 (Design and Contingencies - $1,000) 11 (7) Amity Township, Valley Road over 12 Spring Creek, Bridge Rehabilitation 10,000 13 (Base Construction Allocation - $8,000) 14 (Design and Contingencies - $2,000) 15 (8) Amity Township, Monocacy Road over 16 Monocacy Creek, Bridge Rehabilitation 11,000 17 (Base Construction Allocation - $9,000) 18 (Design and Contingencies - $2,000) 19 (9) Bethel Township, T-492 over Little 20 Swatara Creek, Bridge Replacement 700,000 21 (Base Construction Allocation - 22 $500,000) 23 (Land Allocation - $50,000) 24 (Design and Contingencies - $150,000) 25 (10) Bethel Township, T-682 over Crosskill 26 Creek, Bridge Replacement 750,000 27 (Base Construction Allocation - 28 $550,000) 29 (Land Allocation - $50,000) 30 (Design and Contingencies - $150,000) 19970S0186B0179 - 46 -
1 (11) Lenhartsville Borough, Penn Avenue 2 over Maiden Creek, Bridge Replacement 960,000 3 (Base Construction Allocation - 4 $750,000) 5 (Land Allocation - $10,000) 6 (Design and Contingencies - $200,000) 7 (12) Mohnton Borough, Main Street over 8 Wyomissing Creek, Bridge Replacement 750,000 9 (Base Construction Allocation - 10 $550,000) 11 (Land Allocation - $50,000) 12 (Design and Contingencies - $150,000) 13 (13) Muhlenberg Township, Hain Avenue over 14 Laurel Run, Bridge Rehabilitation 100,000 15 (Base Construction Allocation - 16 $80,000) 17 (Design and Contingencies - $20,000) 18 (14) Oley Township, T-500 over Furnace 19 Creek, Bridge Replacement 700,000 20 (Base Construction Allocation - 21 $500,000) 22 (Land Allocation - $50,000) 23 (Design and Contingencies - $150,000) 24 (15) Robesonia Borough, Freeman Street 25 over Furnace Creek, Bridge Replacement 700,000 26 (Base Construction Allocation - 27 $500,000) 28 (Land Allocation - $50,000) 29 (Design and Contingencies - $150,000) 30 (16) Washington Township, T-884 over Swamp 19970S0186B0179 - 47 -
1 Creek, Bridge Replacement 700,000 2 (Base Construction Allocation - 3 $500,000) 4 (Land Allocation - $50,000) 5 (Design and Contingencies - $150,000) 6 (17) Upper Bern Township, Mill Hill Road, 7 T-712 over Mill Creek, Bridge 8 Replacement 70,000 9 (Base Construction Allocation - 10 $40,000) 11 (Land Allocation - $10,000) 12 (Design and Contingencies - $20,000) 13 (b) State Bridges 14 (1) SR 0010, Reading Road over Tributary 15 of Conestoga Creek, Caernarvon 16 Township, Bridge Rehabilitation 775,000 17 (Base Construction Allocation - 18 $490,000) 19 (Land Allocation - $100,000) 20 (Design and Contingencies - $185,000) 21 (2) SR 0222, SR 0222 Northbound over SR 22 0737 Exit, Maxatawny Township, Bridge 23 Painting 45,000 24 (Base Construction Allocation - 25 $45,000) 26 (3) SR 0222, North Elm Street over SR 27 0222, Kutztown Borough, Bridge 28 Painting 45,000 29 (Base Construction Allocation - 30 $45,000) 19970S0186B0179 - 48 -
1 (4) SR 0222, SR 0222 Northbound over SR 2 8015, Ramp G, Maxatawny Township, 3 Bridge Painting 45,000 4 (Base Construction Allocation - 5 $45,000) 6 (5) SR 0222, SR 0222 Southbound over SR 7 8015, Ramp G, Maxatawny Township, 8 Bridge Painting 45,000 9 (Base Construction Allocation - 10 $45,000) 11 (6) SR 2038, Grist Mill Road over 12 Ironstone Creek, Douglass Township, 13 Bridge Replacement 405,000 14 (Base Construction Allocation - 15 $235,000) 16 (Land Allocation - $70,000) 17 (Design and Contingencies - $100,000) 18 (7) SR 0073, Bridge over Railroad, Maiden 19 Creek Township, Bridge Rehabilitation 14,000 20 (Base Construction Allocation - 21 $12,000) 22 (Design and Contingencies - $2,000) 23 (8) SR 2014, Spring Street Subway, City of 24 Reading, Bridge Rehabilitation 18,000 25 (Base Construction Allocation - 26 $15,000) 27 (Design and Contingencies - $3,000) 28 (9) SR 0073, SR 0073 over Manatawny Creek, 29 Oley Township, Bridge Rehabilitation 500,000 30 (Base Construction Allocation - 19970S0186B0179 - 49 -
1 $450,000) 2 (Design and Contingencies - $50,000) 3 (10) SR 0061, SR 0061 over Blue Mountain 4 Railroad, Borough of Hamburg, Bridge 5 Rehabilitation 200,000 6 (Base Construction Allocation - 7 $175,000) 8 (Design and Contingencies - $25,000) 9 (11) SR 0078, SR 0078 over SR 1024, 10 Greenwich Township, Bridge 11 Rehabilitation 500,000 12 (Base Construction Allocation - 13 $450,000) 14 (Design and Contingencies - $50,000) 15 (12) SR 0078, SR 0078 over T-808, Windsor 16 Township, Bridge Rehabilitation 500,000 17 (Base Construction Allocation - 18 $450,000) 19 (Design and Contingencies - $50,000) 20 (13) SR 0078, SR 0078 over Fifth Street, 21 Borough of Hamburg, Bridge 22 Rehabilitation 200,000 23 (Base Construction Allocation - 24 $175,000) 25 (Design and Contingencies - $25,000) 26 (14) SR 0078, SR 0078 over T-688, Bethel 27 Township, Bridge Rehabilitation 250,000 28 (Base Construction Allocation - 29 $225,000) 30 (Design and Contingencies - $25,000) 19970S0186B0179 - 50 -
1 (15) SR 0176, SR 0176 over T-568, Robeson 2 Township, Bridge Rehabilitation 250,000 3 (Base Construction Allocation - 4 $200,000) 5 (Design and Contingencies - $50,000) 6 (16) SR 0176, SR 0176 2/10 mile south of 7 SR 0422, Cumru Township, Bridge 8 Rehabilitation 350,000 9 (Base Construction Allocation - 10 $300,000) 11 (Design and Contingencies - $50,000) 12 (17) SR 1083, SR 0183 over Little 13 Northkill Creek, Jefferson Township, 14 Bridge Replacement 1,000,000 15 (Base Construction Allocation - 16 $750,000) 17 (Land Allocation - $100,000) 18 (Design and Contingencies - $150,000) 19 (18) SR 0222, SR 0222 over Abandoned 20 Railroad, City of Reading, Bridge 21 Rehabilitation 200,000 22 (Base Construction Allocation - 23 $150,000) 24 (Design and Contingencies - $50,000) 25 (19) SR 0422, SR 0422 over Tulpehocken 26 Creek, Borough of Womelsdorf, Bridge 27 Rehabilitation 200,000 28 (Base Construction Allocation - 29 $150,000) 30 (Design and Contingencies - $50,000) 19970S0186B0179 - 51 -
1 (20) SR 0568, SR 0568 over Allegheny 2 Creek, Robeson Township, Bridge 3 Rehabilitation 100,000 4 (Base Construction Allocation - 5 $80,000) 6 (Design and Contingencies - $20,000) 7 (21) SR 0737, SR 0737 2.63 miles north of 8 Kutztown, Greenwich Township, Bridge 9 Rehabilitation 500,000 10 (Base Construction Allocation - 11 $450,000) 12 (Design and Contingencies - $50,000) 13 (22) SR 0737, SR 0737 2.82 miles north of 14 Kutztown, Greenwich Township, Bridge 15 Rehabilitation 500,000 16 (Base Construction Allocation - 17 $450,000) 18 (Design and Contingencies - $50,000) 19 (23) SR 2025, SR 2025 1/2 mile east of SR 20 0422, Amity Township, Bridge 21 Replacement 300,000 22 (Base Construction Allocation - 23 $200,000) 24 (Land Allocation - $15,000) 25 (Design and Contingencies - $85,000) 26 (24) SR 2031, SR 2031 over Hay Creek, 27 Robeson Township, Bridge 28 Rehabilitation 500,000 29 (Base Construction Allocation - 30 $450,000) 19970S0186B0179 - 52 -
1 (Design and Contingencies - $50,000) 2 (25) SR 2032, SR 2032 over Tributary of 3 Swamp Creek, Washington Township, 4 Bridge Replacement 500,000 5 (Base Construction Allocation - 6 $375,000) 7 (Land Allocation - $25,000) 8 (Design and Contingencies - $100,000) 9 (26) SR 2039, SR 2039 over SR 0422, Exeter 10 Township, Bridge Replacement 2,750,000 11 (Base Construction Allocation - 12 $2,000,000) 13 (Land Allocation - $250,000) 14 (Design and Contingencies - $500,000) 15 (27) SR 2041, SR 2041 2 miles west of 16 Weavertown, Amity Township, Bridge 17 Replacement 200,000 18 (Base Construction Allocation - 19 $125,000) 20 (Land Allocation - $15,000) 21 (Design and Contingencies - $60,000) 22 (28) SR 2057, SR 2057 over Leaf Creek, 23 Amity Township, Bridge Replacement 600,000 24 (Base Construction Allocation - 25 $425,000) 26 (Land Allocation - $25,000) 27 (Design and Contingencies - $150,000) 28 (29) SR 3003, SR 3003 over Angelica Creek, 29 Cumru Township, Bridge Replacement 200,000 30 (Base Construction Allocation - 19970S0186B0179 - 53 -
1 $125,000) 2 (Land Allocation - $15,000) 3 (Design and Contingencies - $60,000) 4 (30) SR 4026, SR 4026 over Irish Creek, 5 Borough of Centerport, Bridge 6 Rehabilitation 250,000 7 (Base Construction Allocation - 8 $225,000) 9 (Design and Contingencies - $25,000) 10 Section 11. Blair County. 11 (a) Local Bridges 12 (1) Antis Township, T-490, Becker Road 13 Bridge over Tributary of Little Juniata 14 River, Bridge Replacement 310,000 15 (Base Construction Allocation - 16 $250,000) 17 (Land Allocation - $10,000) 18 (Design and Contingencies - $50,000) 19 (2) Taylor Township, T-332, Halter Creek 20 Bridge over Halter Creek, Bridge 21 Replacement 395,000 22 (Base Construction Allocation - 23 $300,000) 24 (Land Allocation - $10,000) 25 (Design and Contingencies - $85,000) 26 (3) Greenfield Township, T-531 over South 27 Poplar Run, Construct new bridge 280,000 28 (Base Construction Allocation - 29 $200,000) 30 (Land Allocation - $20,000) 19970S0186B0179 - 54 -
1 (Design and Contingencies - $60,000) 2 (4) Greenfield Township, T-531 over Big 3 Lick Branch of South Poplar Run, Bridge 4 Replacement 565,000 5 (Base Construction Allocation - 6 $465,000) 7 (Land Allocation - $30,000) 8 (Design and Contingencies - $70,000) 9 (5) Greenfield Township, County Road 101 10 over Polecat Run, Bridge Replacement 520,000 11 (Base Construction Allocation - 12 $400,000) 13 (Land Allocation - $20,000) 14 (Design and Contingencies - $100,000) 15 (6) Newry Borough, Allegheny Street over 16 Tributary of Poplar Run, Bridge 17 Rehabilitation 425,000 18 (Base Construction Allocation - 19 $350,000) 20 (Land Allocation - $25,000) 21 (Design and Contingencies - $50,000) 22 (b) State bridges 23 (1) SR 0022, Canal Park Bridges over the 24 Juniata River, Hollidaysburg Borough, 25 Bridge Replacement 3,000,000 26 (Base Construction Allocation - 27 $2,000,000) 28 (Land Allocation - $650,000) 29 (Design and Contingencies - $350,000) 30 (2) SR 4008, SR 4008 over Tributary of 19970S0186B0179 - 55 -
1 Glenwhite Run, Logan Township, Bridge 2 Replacement 240,000 3 (Base Construction Allocation - 4 $200,000) 5 (Land Allocation - $5,000) 6 (Design and Contingencies - $35,000) 7 Section 12. Bradford County. 8 (a) Local Bridges 9 (1) Burlington Township, T-547 over Wallis 10 Run, Bridge Replacement 395,000 11 (Base Construction Allocation - 12 $310,000) 13 (Land Allocation - $10,000) 14 (Design and Contingencies - $75,000) 15 (2) Pike Township, T-790 over Gaylord 16 Creek and South Creek, Bridge 17 Replacement 495,000 18 (Base Construction Allocation - 19 $410,000) 20 (Land Allocation - $10,000) 21 (Design and Contingencies - $75,000) 22 (b) State Bridges 23 (1) SR 0006, North Bridge over Sugar 24 Creek, South of Longs Pond Road, Bridge 25 Replacement 1,139,000 26 (Base Construction Allocation - 27 $911,000) 28 (Land Allocation - $57,000) 29 (Design and Contingencies - $171,000) 30 (2) SR 0409, Billing Creek Bridge, Village 19970S0186B0179 - 56 -
1 of Camptown, Bridge Replacement 318,000 2 (Base Construction Allocation - 3 $254,000) 4 (Land Allocation - $16,000) 5 (Design and Contingencies - $48,000) 6 (3) SR 3029, Towanda Creek Bridges between 7 T-327 and T-326 on Gulf Road, Village 8 of Granville Center, Bridge 9 Replacement 593,000 10 (Base Construction Allocation - 11 $474,000) 12 (Land Allocation - $30,000) 13 (Design and Contingencies - $89,000) 14 (4) SR 4008, Bridge over Tributary of 15 Sugar Creek, Columbia Township, Bridge 16 Replacement 298,000 17 (Base Construction Allocation - 18 $238,000) 19 (Land Allocation - $15,000) 20 (Design and Contingencies - $45,000) 21 (5) SR 0414, Bridge over Towanda Creek, 22 Bradford Borough, Bridge Painting 195,000 23 (Base Construction Allocation - 24 $185,000) 25 (Design and Contingencies - $10,000) 26 (6) US 6, US 6 over Sugar Creek, Sylvania 27 Borough, Bridge Replacement 633,000 28 (Base Construction Allocation - 29 $506,000) 30 (Land Allocation - $32,000) 19970S0186B0179 - 57 -
1 (Design and Contingencies - $95,000) 2 (7) SR 0014, SR 0014 over Tributary of 3 Sugar Creek, Troy Township, Bridge 4 Replacement 410,000 5 (Base Construction Allocation - 6 $280,000) 7 (Land Allocation - $30,000) 8 (Design and Contingencies - $100,000) 9 (8) SR 0187, SR 0187 over Wappensing 10 Creek, Windham Township, Bridge 11 Replacement 2,000,000 12 (Base Construction Allocation - 13 $1,600,000) 14 (Land Allocation - $100,000) 15 (Design and Contingencies - $300,000) 16 (9) SR 0414, SR 0414 over Tributary of 17 Towanda Creek, Canton Township, Bridge 18 Replacement 320,000 19 (Base Construction Allocation - 20 $256,000) 21 (Land Allocation - $16,000) 22 (Design and Contingencies - $48,000) 23 (10) SR 0467, SR 0467 over Johnsons Creek, 24 Orwell Township, Bridge Replacement 751,000 25 (Base Construction Allocation - 26 $601,000) 27 (Land Allocation - $37,000) 28 (Design and Contingencies - $113,000) 29 (11) SR 0514, SR 0514 over North Branch of 30 Towanda Creek, Granville Township, 19970S0186B0179 - 58 -
1 Bridge Replacement 638,000 2 (Base Construction Allocation - 3 $510,000) 4 (Land Allocation - $32,000) 5 (Design and Contingencies - $96,000) 6 (12) SR 1022, Ulster Bridge, Ulster 7 Township, Bridge Painting 6,299,000 8 (Base Construction Allocation - 9 $5,039,000) 10 (Land Allocation - $315,000) 11 (Design and Contingencies - $945,000) 12 (13) SR 1026, SR 1026 over Wyalusing 13 Creek, Pike Township, Bridge 14 Replacement 650,000 15 (Base Construction Allocation - 16 $520,000) 17 (Land Allocation - $30,000) 18 (Design and Contingencies - $100,000) 19 (14) SR 1049, SR 1049 over Tributary of 20 Pendleton Creek, Warren Township, 21 Bridge Replacement 340,000 22 (Base Construction Allocation - 23 $270,000) 24 (Land Allocation - $15,000) 25 (Design and Contingencies - $55,000) 26 (15) SR 1055, SR 1055 over Parks Creek, 27 Rome Township, Bridge Replacement 315,000 28 (Base Construction Allocation - 29 $250,000) 30 (Land Allocation - $15,000) 19970S0186B0179 - 59 -
1 (Design and Contingencies - $50,000) 2 (16) SR 2018, SR 2018 over Tributary of 3 Susquehanna River, Asylum Township, 4 Bridge Replacement 260,000 5 (Base Construction Allocation - 6 $208,000) 7 (Land Allocation - $39,000) 8 (Design and Contingencies - $13,000) 9 (17) SR 3005, SR 3005 over Towanda Creek, 10 Canton Township, Bridge Replacement 666,000 11 (Base Construction Allocation - 12 $533,000) 13 (Land Allocation - $33,000) 14 (Design and Contingencies - $100,000) 15 (18) SR 3029, SR 3029 over Mud Creek, Troy 16 Township, Bridge Replacement 457,000 17 (Base Construction Allocation - 18 $366,000) 19 (Land Allocation - $23,000) 20 (Design and Contingencies - $68,000) 21 (19) SR 4002, SR 4002 over Browns Creek, 22 Burlington Township, Bridge 23 Replacement 561,000 24 (Base Construction Allocation - 25 $449,000) 26 (Land Allocation - $28,000) 27 (Design and Contingencies - $84,000) 28 (20) SR 4013, SR 4013 over Justice Run, 29 Ridgebury Township, Bridge Replacement 351,000 30 (Base Construction Allocation - 19970S0186B0179 - 60 -
1 $281,000) 2 (Land Allocation - $18,000) 3 (Design and Contingencies - $52,000) 4 (21) SR 4014, SR 4014 over Branch of 5 Tomjack Creek, Smithfield Township, 6 Bridge Replacement 360,000 7 (Base Construction Allocation - 8 $288,000) 9 (Land Allocation - $18,000) 10 (Design and Contingencies - $54,000) 11 (22) SR 4015, SR 4015 over Mill Creek, 12 Springfield Township, Bridge 13 Replacement 390,000 14 (Base Construction Allocation - 15 $312,000) 16 (Land Allocation - $20,000) 17 (Design and Contingencies - $58,000) 18 (23) SR 4031, SR 4031 over Tributary of 19 Beckwith Creek, Wells Township, Bridge 20 Replacement 243,000 21 (Base Construction Allocation - 22 $196,000) 23 (Land Allocation - $10,000) 24 (Design and Contingencies - $37,000) 25 Section 13. Bucks County. 26 (a) Local Bridges 27 (1) Springfield Township, I-479, Bridge 28 Street Bridge over Cooks Creek, Bridge 29 Replacement 500,000 30 (Base Construction Allocation - 19970S0186B0179 - 61 -
1 $365,000) 2 (Land Allocation - $35,000) 3 (Design and Contingencies - $100,000) 4 (2) Springfield Township, T-404, Hawks 5 Mill County Bridge No.196, Shale Road 6 over Cooks Creek, Bridge 7 Rehabilitation 100,000 8 (Base Construction Allocation - 9 $90,000) 10 (Design and Contingencies - $10,000) 11 (b) State Bridges 12 (1) SR 0032, River Road at Fleecydale over 13 Paunacussing Creek, Solebury Township, 14 Bridge Replacement 1,400,000 15 (Base Construction Allocation - 16 $1,200,000) 17 (Design and Contingencies - $200,000) 18 (2) SR 2002, Otter Street Bridge over 19 Otter Creek, Bristol Borough, Bridge 20 Replacement 1,150,000 21 (Base Construction Allocation - 22 $900,000) 23 (Land Allocation - $50,000) 24 (Design and Contingencies - $200,000) 25 (3) SR 2025, Bristol Road Bridge over 26 Little Neshaminy Creek, Warwick 27 Township, Bridge Replacement 1,120,000 28 (Base Construction Allocation - 29 $900,000) 30 (Land Allocation - $80,000) 19970S0186B0179 - 62 -
1 (Design and Contingencies - $140,000) 2 (4) SR 2047, Hulmeville Avenue Bridge over 3 Conrail, Middletown, Bridge 4 Replacement 5,600,000 5 (Base Construction Allocation - 6 $4,000,000) 7 (Land Allocation - $800,000) 8 (Design and Contingencies - $800,000) 9 (5) SR 4033, Upper Ridge Road Bridge over 10 Unami Creek, Milford Township, Bridge 11 Replacement 2,000,000 12 (Base Construction Allocation - 13 $1,600,000) 14 (Land Allocation - $100,000) 15 (Design and Contingencies - $300,000) 16 (6) SR 4091, Kellers Church Road Bridge 17 over Deep Run, Bedminster, Bridge 18 Replacement 2,000,000 19 (Base Construction Allocation - 20 $1,500,000) 21 (Land Allocation - $150,000) 22 (Design and Contingencies - $350,000) 23 (7) SR 0202, Doylestown Bypass (Five 24 Bridges) over SR 0611, Doylestown 25 Township, Bridge Rehabilitations 2,200,000 26 (Base Construction Allocation - 27 $2,000,000) 28 (Land Allocation - $50,000) 29 (Design and Contingencies - $150,000) 30 (8) SR 0611, Easton Road (Two Bridges) 19970S0186B0179 - 63 -
1 over Tohickon and Deep Run Creeks, 2 Bedminister Township, Bridge 3 Replacements 1,650,000 4 (Base Construction Allocation - 5 $1,500,000) 6 (Land Allocation - $50,000) 7 (Design and Contingencies - $100,000) 8 (9) SR 2089, Almshouse Road Bridge over 9 Neshaminy Creek, Doylestown Township, 10 Bridge Replacement 1,800,000 11 (Base Construction Allocation - 12 $1,500,000) 13 (Land Allocation - $150,000) 14 (Design and Contingencies - $150,000) 15 (10) SR 0013, Bristol Pike over Otter 16 Creek, Bristol Township, Bridge 17 Replacement 1,600,000 18 (Base Construction Allocation - 19 $1,200,000) 20 (Land Allocation - $100,000) 21 (Design and Contingencies - $300,000) 22 (11) SR 0413, Bridge over Mill Creek, 23 Bristol Township, Bridge Replacement 600,000 24 (Base Construction Allocation - 25 $350,000) 26 (Land Allocation - $50,000) 27 (Design and Contingencies - $200,000) 28 (12) SR 2002, State Road over Neshaminy 29 Creek, Bristol Township, Bridge 30 Replacement 3,700,000 19970S0186B0179 - 64 -
1 (Base Construction Allocation - 2 $3,000,000) 3 (Land Allocation - $250,000) 4 (Design and Contingencies - $450,000) 5 (13) SR 0013, Bristol Pike over St. 6 Francis Creek, Bensalem Township, 7 Bridge Replacement 550,000 8 (Base Construction Allocation - 9 $400,000) 10 (Land Allocation - $50,000) 11 (Design and Contingencies - $100,000) 12 (14) SR 0013, SR 0013 over Conrail and 13 Newbold Road, Falls Township, Bridge 14 Replacement 5,000,000 15 (Base Construction Allocation - 16 $4,500,000) 17 (Land Allocation - $150,000) 18 (Design and Contingencies - $350,000) 19 (15) SR 0032, West Bridge Street over 20 Tributary of Delaware River, 21 Morrisville Borough, Bridge 22 Replacement 550,000 23 (Base Construction Allocation - 24 $400,000) 25 (Land Allocation - $50,000) 26 (Design and Contingencies - $100,000) 27 (16) SR 0213, West Maple Avenue over 28 Neshaminy Creek, Middletown Township, 29 Bridge Replacement 2,000,000 30 (Base Construction Allocation - 19970S0186B0179 - 65 -
1 $1,700,000) 2 (Land Allocation - $100,000) 3 (Design and Contingencies - $200,000) 4 (17) SR 1004, Cold Spring Creamery Road 5 over Branch of Pine Run Creek, 6 Buckingham Township, Bridge 7 Replacement 450,000 8 (Base Construction Allocation - 9 $380,000) 10 (Land Allocation - $10,000) 11 (Design and Contingencies - $60,000) 12 (18) SR 2005, Cornwells Avenue over 13 Poquessing Creek, Bensalem Township, 14 Bridge Replacement 350,000 15 (Base Construction Allocation - 16 $250,000) 17 (Land Allocation - $25,000) 18 (Design and Contingencies - $75,000) 19 (19) SR 2026, Trenton Avenue over Rock 20 Run, Falls Township, Bridge 21 Replacement 700,000 22 (Base Construction Allocation - 23 $500,000) 24 (Land Allocation - $50,000) 25 (Design and Contingencies - $150,000) 26 (20) SR 2037, Lincoln Highway Eastbound 27 over Queen Anne Creek, Falls Township, 28 Bridge Replacement 700,000 29 (Base Construction Allocation - 30 $500,000) 19970S0186B0179 - 66 -
1 (Land Allocation - $75,000) 2 (Design and Contingencies - $125,000) 3 (21) SR 2037, Lincoln Highway over Branch 4 of Queen Anne Creek, Falls Township, 5 Bridge Replacement 500,000 6 (Base Construction Allocation - 7 $350,000) 8 (Land Allocation - $50,000) 9 (Design and Contingencies - $100,000) 10 (22) SR 2047, Hulmeville Avenue over 11 Conrail, Middletown Township, Bridge 12 Replacement 1,200,000 13 (Base Construction Allocation - 14 $1,000,000) 15 (Land Allocation - $75,000) 16 (Design and Contingencies - $125,000) 17 Section 14. Butler County. 18 (a) Local Bridges 19 (1) Muddy Creek and Worth Townships, T- 20 348, Muddy Creek Bridge over Muddy 21 Creek, Bridge Replacement 730,000 22 (Base Construction Allocation - 23 $550,000) 24 (Land Allocation - $15,000) 25 (Design and Contingencies - $165,000) 26 (2) Allegheny Township, T-542, Farrington 27 Bridge, Bridge Replacement 700,000 28 (Base Construction Allocation - 29 $500,000) 30 (Land Allocation - $25,000) 19970S0186B0179 - 67 -
1 (Design and Contingencies - $175,000) 2 (3) Concord Township, T-508, Greece City 3 Bridge, Bridge Replacement 700,000 4 (Base Construction Allocation - 5 $500,000) 6 (Land Allocation - $25,000) 7 (Design and Contingencies - $175,000) 8 (4) Cranberry Township, T-326 over Brush 9 Creek, Bridge Replacement 700,000 10 (Base Construction Allocation - 11 $500,000) 12 (Land Allocation - $25,000) 13 (Design and Contingencies - $175,000) 14 (5) Cranberry Township, T-300, Bridge 15 Replacement 700,000 16 (Base Construction Allocation - 17 $500,000) 18 (Land Allocation - $25,000) 19 (Design and Contingencies - $175,000) 20 (6) Jackson Township, T-323, Senn Bridge, 21 Bridge Replacement 700,000 22 (Base Construction Allocation - 23 $500,000) 24 (Land Allocation - $25,000) 25 (Design and Contingencies - $175,000) 26 (7) Jackson Township, T-325, Eidewau 27 Bridge, Bridge Replacement 700,000 28 (Base Construction Allocation - 29 $500,000) 30 (Land Allocation - $25,000) 19970S0186B0179 - 68 -
1 (Design and Contingencies - $175,000) 2 (8) Jefferson Township, T-844 over Thorn 3 Creek, Bridge Replacement 700,000 4 (Base Construction Allocation - 5 $500,000) 6 (Land Allocation - $25,000) 7 (Design and Contingencies - $175,000) 8 (9) Mars Borough, Hook Street, Bridge 9 Replacement 700,000 10 (Base Construction Allocation - 11 $500,000) 12 (Land Allocation - $25,000) 13 (Design and Contingencies - $175,000) 14 (10) Mars Borough, Church Street, Kocher 15 Bridge, Bridge Replacement 700,000 16 (Base Construction Allocation - 17 $500,000) 18 (Land Allocation - $25,000) 19 (Design and Contingencies - $175,000) 20 (11) Middlesex Township, T-380 over Glade 21 Run, Bridge Replacement 700,000 22 (Base Construction Allocation - 23 $500,000) 24 (Land Allocation - $25,000) 25 (Design and Contingencies - $175,000) 26 (12) Worth Township, T-318, Payne Bridge, 27 Bridge Replacement 700,000 28 (Base Construction Allocation - 29 $500,000) 30 (Land Allocation - $25,000) 19970S0186B0179 - 69 -
1 (Design and Contingencies - $175,000) 2 (13) Cranberry Township, T-326 over 3 Tributary of Brush Creek, Bridge 4 Replacement 167,000 5 (Base Construction Allocation - 6 $135,000) 7 (Land Allocation - $19,000) 8 (Design and Contingencies - $13,000) 9 (b) State Bridges 10 (1) SR 0228, Houseville Bridge over B&LE 11 Railroad, Clinton Township, Bridge Deck 12 Replacement 636,000 13 (Base Construction Allocation - 14 $600,000) 15 (Design and Contingencies - $36,000) 16 (2) SR 0019, Rose Point Bridge over SR 17 0422, Muddycreek Township, Bridge 18 Painting 115,000 19 (Base Construction Allocation - 20 $100,000) 21 (Design and Contingencies - $15,000) 22 (3) SR 0058, Blocks Run Bridge No.1 over 23 Blocks Run, Marion Township, Bridge 24 Painting 65,000 25 (Base Construction Allocation - 26 $50,000) 27 (Design and Contingencies - $15,000) 28 (4) SR 0058, Blocks Run Bridge No.2 over 29 Blocks Run, Venango Township, Bridge 30 Painting 60,000 19970S0186B0179 - 70 -
1 (Base Construction Allocation - 2 $45,000) 3 (Design and Contingencies - $15,000) 4 (5) SR 0058, Murrin Run Bridge over Murrin 5 Run, Venango Township, Bridge Painting 60,000 6 (Base Construction Allocation - 7 $45,000) 8 (Design and Contingencies - $15,000) 9 (6) SR 0068, Glade Run Bridge over Glade 10 Run, Zelienople Borough, Bridge 11 Painting 70,000 12 (Base Construction Allocation - 13 $55,000) 14 (Design and Contingencies - $15,000) 15 (7) SR 0079, Muddy Creek Bridge Northbound 16 over SR 0422 and Muddy Creek, Muddy 17 Creek Township, Bridge Painting 255,000 18 (Base Construction Allocation - 19 $240,000) 20 (Design and Contingencies - $15,000) 21 (8) SR 0079, Muddy Creek Bridge Southbound 22 over SR 0422 and Muddy Creek, Muddy 23 Creek Township, Bridge Painting 255,000 24 (Base Construction Allocation - 25 $240,000) 26 (Design and Contingencies - $15,000) 27 (9) SR 0108, Slippery Rock Exit Bridge 28 over I-79, Worth Township, Bridge 29 Painting 225,000 30 (Base Construction Allocation - 19970S0186B0179 - 71 -
1 $210,000) 2 (Design and Contingencies - $15,000) 3 (10) SR 0138, Glades Wildlife Lake Bridge 4 over South Branch of Slippery Rock 5 Creek, Concord Township, Bridge 6 Painting 85,000 7 (Base Construction Allocation - 8 $70,000) 9 (Design and Contingencies - $15,000) 10 (11) SR 0258, Wolf Creek Bridge over Wolf 11 Creek, Slippery Rock Township, Bridge 12 Painting 125,000 13 (Base Construction Allocation - 14 $110,000) 15 (Design and Contingencies - $15,000) 16 (12) SR 0308, Renick Bridge over Stoney 17 Run and Railroad, Center Township, 18 Bridge Painting 405,000 19 (Base Construction Allocation - 20 $390,000) 21 (Design and Contingencies - $15,000) 22 (13) SR 0422, Mount Chestnut Bridge 23 Eastbound over Little Connoquenessing 24 Creek and SR 3007, Butler Township, 25 Bridge Painting 355,000 26 (Base Construction Allocation - 27 $340,000) 28 (Design and Contingencies - $15,000) 29 (14) SR 0422, Bonnie Brook Bridge over 30 Bonnie Brook, Summit Township, Bridge 19970S0186B0179 - 72 -
1 Painting 90,000 2 (Base Construction Allocation - 3 $75,000) 4 (Design and Contingencies - $15,000) 5 (15) SR 1004, Bruin Bridge over Bear 6 Creek, Bruin Borough, Bridge Painting 85,000 7 (Base Construction Allocation - 8 $70,000) 9 (Design and Contingencies - $15,000) 10 (16) SR 1011, Rattigan Bridge No.1 over 11 Buffalo Creek, Donegal Township, Bridge 12 Painting 55,000 13 (Base Construction Allocation - 14 $40,000) 15 (Design and Contingencies - $15,000) 16 (17) SR 1016, Eastland Drive Bridge over 17 Connoquenessing Creek, Butler Township, 18 Bridge Painting 80,000 19 (Base Construction Allocation - 20 $65,000) 21 (Design and Contingencies - $15,000) 22 (18) SR 1019, Rough Run Bridge over Rough 23 Run, Windfield Township, Bridge 24 Painting 95,000 25 (Base Construction Allocation - 26 $80,000) 27 (Design and Contingencies - $15,000) 28 (19) SR 1019, Chicora Bridge over Buffalo 29 Creek, Chicora Borough, Bridge 30 Painting 70,000 19970S0186B0179 - 73 -
1 (Base Construction Allocation - 2 $55,000) 3 (Design and Contingencies - $15,000) 4 (20) SR 1021, Rattigan Bridge No.2 over 5 Buffalo Creek, Donegal Township, Bridge 6 Painting 70,000 7 (Base Construction Allocation - 8 $55,000) 9 (Design and Contingencies - $15,000) 10 (21) SR 1025, Bonnie Brook Bridge No.1 11 over Bonnie Brook, Summit Township, 12 Bridge Painting 90,000 13 (Base Construction Allocation - 14 $75,000) 15 (Design and Contingencies - $15,000) 16 (22) SR 2004, Connoquenessing Creek Bridge 17 over Connoquenessing Creek, Butler 18 City, Bridge Painting 135,000 19 (Base Construction Allocation - 20 $120,000) 21 (Design and Contingencies - $15,000) 22 (23) SR 2004, Bonnie Brook Bridge No.2 23 over Bonnie Brook, East Butler Borough, 24 Bridge Painting 90,000 25 (Base Construction Allocation - 26 $75,000) 27 (Design and Contingencies - $15,000) 28 (24) SR 2011, Lardintown Run Bridge No.1 29 over Lardintown Run, Clinton Township, 30 Bridge Painting 75,000 19970S0186B0179 - 74 -
1 (Base Construction Allocation - 2 $60,000) 3 (Design and Contingencies - $15,000) 4 (25) SR 2011, Lardintown Run Bridge No.2 5 over Lardintown Run, Clinton Township, 6 Bridge Painting 65,000 7 (Base Construction Allocation - 8 $50,000) 9 (Design and Contingencies - $15,000) 10 (26) SR 2011, Lardintown Run Bridge No.3 11 over Lardintown Run, Clinton Township, 12 Bridge Painting 65,000 13 (Base Construction Allocation - 14 $50,000) 15 (Design and Contingencies - $15,000) 16 (27) SR 3004, McCalmont Bridge over 17 Connoquenessing Creek, Butler Township, 18 Bridge Painting 105,000 19 (Base Construction Allocation - 20 $90,000) 21 (Design and Contingencies - $15,000) 22 (28) SR 3007, Reinfrew Bridge over 23 Connoquenessing Creek, Penn Township, 24 Bridge Painting 115,000 25 (Base Construction Allocation - 26 $100,000) 27 (Design and Contingencies - $15,000) 28 (29) SR 3010, Zeno Bridge over Glade Run, 29 Forward Township, Bridge Painting 105,000 30 (Base Construction Allocation - 19970S0186B0179 - 75 -
1 $90,000) 2 (Design and Contingencies - $15,000) 3 (30) SR 3017, Kaufman Run Bridge over 4 Kaufman Run, Adams Township, Bridge 5 Painting 70,000 6 (Base Construction Allocation - 7 $55,000) 8 (Design and Contingencies - $15,000) 9 (31) SR 3017, Breakneck Creek Bridge over 10 Breakneck Creek, Adams Township, Bridge 11 Painting 105,000 12 (Base Construction Allocation - 13 $90,000) 14 (Design and Contingencies - $15,000) 15 (32) SR 3025, Little Connoquenessing Creek 16 Bridge over Little Connoquenessing 17 Creek, Lancaster Township, Bridge 18 Painting 125,000 19 (Base Construction Allocation - 20 $110,000) 21 (Design and Contingencies - $15,000) 22 (33) SR 4006, Keister's Bridge over 23 Slippery Rock Creek, Slippery Rock 24 Township, Bridge Painting 105,000 25 (Base Construction Allocation - 26 $90,000) 27 (Design and Contingencies - $15,000) 28 (34) SR 4007, Lake Arthur Tributary Bridge 29 over a tributary of Lake Arthur, Worth 30 Township, Bridge Painting 50,000 19970S0186B0179 - 76 -
1 (Base Construction Allocation - 2 $35,000) 3 (Design and Contingencies - $15,000) 4 (35) SR 4007, I-79 North Bridge No.1 over 5 I-79, Worth Township, Bridge Painting 245,000 6 (Base Construction Allocation - 7 $230,000) 8 (Design and Contingencies - $15,000) 9 (36) SR 4007, I-79 North Bridge No.2 over 10 I-79, Worth Township, Bridge Painting 215,000 11 (Base Construction Allocation - 12 $200,000) 13 (Design and Contingencies - $15,000) 14 (37) SR 4010, Bull Valley Bridge over Bull 15 Valley Creek, Washington Township, 16 Bridge Painting 65,000 17 (Base Construction Allocation - 18 $50,000) 19 (Design and Contingencies - $15,000) 20 (38) SR 4012, Seaton Creek Bridge over 21 Seaton Creek, Marion Township, Bridge 22 Painting 65,000 23 (Base Construction Allocation - 24 $50,000) 25 (Design and Contingencies - $15,000) 26 (39) SR 8002, North Shore Exit Bridge over 27 Muddy Creek, Worth Township, Bridge 28 Painting 85,000 29 (Base Construction Allocation - 30 $70,000) 19970S0186B0179 - 77 -
1 (Design and Contingencies - $15,000) 2 (40) SR 0422, Route 422 Overpass, 3 Muddycreek Township, Bridge 4 Replacement 1,450,000 5 (Base Construction Allocation - 6 $1,000,000) 7 (Land Allocation - $100,000) 8 (Design and Contingencies - $350,000) 9 (41) SR 0008, B&LE Railroad Overpass, 10 Mercer Township, Bridge Replacement 1,450,000 11 (Base Construction Allocation - 12 $1,000,000) 13 (Land Allocation - $100,000) 14 (Design and Contingencies - $350,000) 15 (42) SR 0038, B&LE Railroad Overpass, 16 Concord Township, Bridge Replacement 1,050,000 17 (Base Construction Allocation - 18 $750,000) 19 (Land Allocation - $50,000) 20 (Design and Contingencies - $250,000) 21 (43) SR 2002, Conrail Railroad Overpass, 22 Summit Township, Bridge Replacement 1,050,000 23 (Base Construction Allocation - 24 $750,000) 25 (Land Allocation - $50,000) 26 (Design and Contingencies - $250,000) 27 (44) SR 2012, B&LE Railroad Overpass, 28 Jefferson Township, Bridge Replacement 1,050,000 29 (Base Construction Allocation - 30 $750,000) 19970S0186B0179 - 78 -
1 (Land Allocation - $50,000) 2 (Design and Contingencies - $250,000) 3 (45) SR 3004, B&LE Railroad Overpass, 4 Butler Township, Bridge Replacement 595,000 5 (Base Construction Allocation - 6 $400,000) 7 (Land Allocation - $20,000) 8 (Design and Contingencies - $175,000) 9 (46) SR 0008, Bridge over Armco Private 10 Drive, Butler Township, Bridge 11 Replacement 1,450,000 12 (Base Construction Allocation - 13 $1,000,000) 14 (Land Allocation - $100,000) 15 (Design and Contingencies - $350,000) 16 (47) SR 0019, Scholars Run Bridge, Jackson 17 Township, Bridge Replacement 1,050,000 18 (Base Construction Allocation - 19 $750,000) 20 (Land Allocation - $50,000) 21 (Design and Contingencies - $250,000) 22 (48) SR 0019, SR 0019 over SR 0422, 23 Muddycreek Township, Bridge 24 Replacement 1,050,000 25 (Base Construction Allocation - 26 $750,000) 27 (Land Allocation - $50,000) 28 (Design and Contingencies - $250,000) 29 (49) SR 0058, McMurray Run Bridge, Marion 30 Township, Bridge Replacement 1,050,000 19970S0186B0179 - 79 -
1 (Base Construction Allocation - 2 $750,000) 3 (Land Allocation - $50,000) 4 (Design and Contingencies - $250,000) 5 (50) SR 0068, Sullivan Run Bridge, Butler 6 Township, Bridge Replacement 1,450,000 7 (Base Construction Allocation - 8 $1,000,000) 9 (Land Allocation - $100,000) 10 (Design and Contingencies - $350,000) 11 (51) SR 0080, I-80 over TR 540, Allegheny 12 Township, Bridge Replacement 1,450,000 13 (Base Construction Allocation - 14 $1,000,000) 15 (Land Allocation - $100,000) 16 (Design and Contingencies - $350,000) 17 (52) SR 0138, Muddy Creek Bridge, Clay 18 Township, Bridge Replacement 595,000 19 (Base Construction Allocation - 20 $400,000) 21 (Land Allocation - $20,000) 22 (Design and Contingencies - $175,000) 23 (53) SR 0173, Slippery Rock Creek Bridge, 24 Slippery Rock Township, Bridge 25 Replacement 1,050,000 26 (Base Construction Allocation - 27 $750,000) 28 (Land Allocation - $50,000) 29 (Design and Contingencies - $250,000) 30 (54) SR 0079, I-79 North Bridge over Ramp, 19970S0186B0179 - 80 -
1 Jackson Township, Bridge Replacement 1,450,000 2 (Base Construction Allocation - 3 $1,000,000) 4 (Land Allocation - $100,000) 5 (Design and Contingencies - $350,000) 6 (55) SR 0079, I-79 South Bridge over Ramp, 7 Jackson Township, Bridge Replacement 1,450,000 8 (Base Construction Allocation - 9 $1,000,000) 10 (Land Allocation - $100,000) 11 (Design and Contingencies - $350,000) 12 (56) SR 0079, I-79 over SR 0068, Jackson 13 Township, Bridge Replacement 1,450,000 14 (Base Construction Allocation - 15 $1,000,000) 16 (Land Allocation - $100,000) 17 (Design and Contingencies - $350,000) 18 (57) SR 0079, I-79 over TR 347, Lancaster 19 Township, Bridge Replacement 1,450,000 20 (Base Construction Allocation - 21 $1,000,000) 22 (Land Allocation - $100,000) 23 (Design and Contingencies - $350,000) 24 (58) SR 0079, I-79 North Bridge over SR 25 0422, Worth Township, Bridge 26 Replacement 1,450,000 27 (Base Construction Allocation - 28 $1,000,000) 29 (Land Allocation - $100,000) 30 (Design and Contingencies - $350,000) 19970S0186B0179 - 81 -
1 (59) SR 0079, I-79 South Bridge over SR 2 0422, Worth Township, Bridge 3 Replacement 1,450,000 4 (Base Construction Allocation - 5 $1,000,000) 6 (Land Allocation - $100,000) 7 (Design and Contingencies - $350,000) 8 (60) SR 0422, SR 0422 over SR 4005, 9 Muddycreek Township, Bridge 10 Replacement 1,450,000 11 (Base Construction Allocation - 12 $1,000,000) 13 (Land Allocation - $100,000) 14 (Design and Contingencies - $350,000) 15 (61) SR 0528, SR 0528 over SR 0422, 16 Franklin Township, Bridge Replacement 1,050,000 17 (Base Construction Allocation - 18 $750,000) 19 (Land Allocation - $50,000) 20 (Design and Contingencies - $250,000) 21 (62) SR 1010, Bear Creek Bridge, Fairview 22 Township, Bridge Replacement 1,050,000 23 (Base Construction Allocation - 24 $750,000) 25 (Land Allocation - $50,000) 26 (Design and Contingencies - $250,000) 27 (63) SR 1014, Bonnie Brook Bridge over 28 Bonnie Brook, Summit Township, Bridge 29 Replacement 595,000 30 (Base Construction Allocation - 19970S0186B0179 - 82 -
1 $400,000) 2 (Land Allocation - $20,000) 3 (Design and Contingencies - $175,000) 4 (64) SR 1016, Connoquenessing Creek 5 Bridge, Summit Township, Bridge 6 Replacement 595,000 7 (Base Construction Allocation - 8 $400,000) 9 (Land Allocation - $20,000) 10 (Design and Contingencies - $175,000) 11 (65) SR 2006, SR 2006 over SR 0422, Summit 12 Township, Bridge Replacement 1,050,000 13 (Base Construction Allocation - 14 $750,000) 15 (Land Allocation - $50,000) 16 (Design and Contingencies - $250,000) 17 (66) SR 2010, Bridge over Branch of Thorn 18 Creek, Jefferson Township, Bridge 19 Replacement 1,050,000 20 (Base Construction Allocation - 21 $750,000) 22 (Land Allocation - $50,000) 23 (Design and Contingencies - $250,000) 24 (67) SR 2010, Little Buffalo Creek Bridge, 25 Winfield Township, Bridge Replacement 1,050,000 26 (Base Construction Allocation - 27 $750,000) 28 (Land Allocation - $50,000) 29 (Design and Contingencies - $250,000) 30 (68) SR 2011, Bridge over Branch of Bull 19970S0186B0179 - 83 -
1 Creek, Clinton Township, Bridge 2 Replacement 595,000 3 (Base Construction Allocation - 4 $400,000) 5 (Land Allocation - $20,000) 6 (Design and Contingencies - $175,000) 7 (69) SR 2011, Little Bull Run Bridge No.4 8 over Bull Run, Clinton Township, Bridge 9 Replacement 595,000 10 (Base Construction Allocation - 11 $400,000) 12 (Land Allocation - $20,000) 13 (Design and Contingencies - $175,000) 14 (70) SR 2018, Bridge No.1 over Branch of 15 Buffalo Creek, Winfield Township, 16 Bridge Replacement 1,050,000 17 (Base Construction Allocation - 18 $750,000) 19 (Land Allocation - $50,000) 20 (Design and Contingencies - $250,000) 21 (71) SR 2018, Bridge No.2 over Branch of 22 Buffalo Creek, Winfield Township, 23 Bridge Replacement 1,050,000 24 (Base Construction Allocation - 25 $750,000) 26 (Land Allocation - $50,000) 27 (Design and Contingencies - $250,000) 28 (72) SR 3025, Little Connoquenessing Creek 29 Bridge, Lancaster Township, Bridge 30 Replacement 595,000 19970S0186B0179 - 84 -
1 (Base Construction Allocation - 2 $400,000) 3 (Land Allocation - $20,000) 4 (Design and Contingencies - $175,000) 5 (73) SR 4007, SR 4007 over SR 0422, Worth 6 Township, Bridge Replacement 1,050,000 7 (Base Construction Allocation - 8 $750,000) 9 (Land Allocation - $50,000) 10 (Design and Contingencies - $250,000) 11 (74) SR 4007, Park Road Bridge, Worth 12 Township, Bridge Replacement 1,050,000 13 (Base Construction Allocation - 14 $750,000) 15 (Land Allocation - $50,000) 16 (Design and Contingencies - $250,000) 17 (75) SR 4010, Long Run Bridge, Slippery 18 Rock Township, Bridge Replacement 595,000 19 (Base Construction Allocation - 20 $400,000) 21 (Land Allocation - $20,000) 22 (Design and Contingencies - $175,000) 23 (76) SR 8005, SR 8005 over SR 0019, 24 Jackson Township, Bridge Replacement 595,000 25 (Base Construction Allocation - 26 $400,000) 27 (Land Allocation - $20,000) 28 (Design and Contingencies - $175,000) 29 (77) SR 0008, William Flynn Bridge, 30 Middlesex Township, Bridge Replacement 1,450,000 19970S0186B0179 - 85 -
1 (Base Construction Allocation - 2 $1,000,000) 3 (Land Allocation - $100,000) 4 (Design and Contingencies - $350,000) 5 (78) SR 0008, Glade Run Bridge, Middlesex 6 Township, Bridge Rehabilitation 1,450,000 7 (Base Construction Allocation - 8 $1,000,000) 9 (Land Allocation - $100,000) 10 (Design and Contingencies - $350,000) 11 (79) SR 0008, Little Glade Run Bridge 12 No.1, Middlesex Township, Bridge 13 Rehabilitation 1,450,000 14 (Base Construction Allocation - 15 $1,000,000) 16 (Land Allocation - $100,000) 17 (Design and Contingencies - $350,000) 18 (80) SR 0008, Little Glade Run Bridge 19 No.2, Middlesex Township, Bridge 20 Rehabilitation 1,450,000 21 (Base Construction Allocation - 22 $1,000,000) 23 (Land Allocation - $100,000) 24 (Design and Contingencies - $350,000) 25 (81) SR 0008, Glade Run Bridge No.2, 26 Middlesex Township, Bridge 27 Rehabilitation 1,450,000 28 (Base Construction Allocation - 29 $1,000,000) 30 (Land Allocation - $100,000) 19970S0186B0179 - 86 -
1 (Design and Contingencies - $350,000) 2 (82) SR 0008, Bulcher Run Bridge, Butler 3 Township, Bridge Rehabilitation 1,450,000 4 (Base Construction Allocation - 5 $1,000,000) 6 (Land Allocation - $100,000) 7 (Design and Contingencies - $350,000) 8 (83) SR 0008, Bridge No.2 over Branch of 9 Muddy Creek, Clay Township, Bridge 10 Rehabilitation 1,450,000 11 (Base Construction Allocation - 12 $1,000,000) 13 (Land Allocation - $100,000) 14 (Design and Contingencies - $350,000) 15 (84) SR 0008, Muddy Creek Bridge, Clay 16 Township, Bridge Rehabilitation 1,450,000 17 (Base Construction Allocation - 18 $1,000,000) 19 (Land Allocation - $100,000) 20 (Design and Contingencies - $350,000) 21 (85) SR 0008, Glade Run Bridge No.3, Brady 22 Township, Bridge Rehabilitation 1,450,000 23 (Base Construction Allocation - 24 $1,000,000) 25 (Land Allocation - $100,000) 26 (Design and Contingencies - $350,000) 27 (86) SR 0008, McDonalds Run Bridge, Mercer 28 Township, Bridge Replacement 1,450,000 29 (Base Construction Allocation - 30 $1,000,000) 19970S0186B0179 - 87 -
1 (Land Allocation - $100,000) 2 (Design and Contingencies - $350,000) 3 (87) SR 0008, McMurry Run Bridge, Mercer 4 Township, Bridge Rehabilitation 1,450,000 5 (Base Construction Allocation - 6 $1,000,000) 7 (Land Allocation - $100,000) 8 (Design and Contingencies - $350,000) 9 (88) SR 0019, Glade Run Bridge No.2, 10 Jackson Township, Bridge 11 Rehabilitation 1,050,000 12 (Base Construction Allocation - 13 $750,000) 14 (Land Allocation - $50,000) 15 (Design and Contingencies - $250,000) 16 (89) SR 0019, Glade Run Bridge No.2, 17 Jackson Township, Bridge 18 Rehabilitation 1,050,000 19 (Base Construction Allocation - 20 $750,000) 21 (Land Allocation - $50,000) 22 (Design and Contingencies - $250,000) 23 (90) SR 0038, Connoquenessing Creek 24 Bridge, Center Township, Bridge 25 Rehabilitation 1,050,000 26 (Base Construction Allocation - 27 $750,000) 28 (Land Allocation - $50,000) 29 (Design and Contingencies - $250,000) 30 (91) SR 0038, Pine Run Bridge, Oakland 19970S0186B0179 - 88 -
1 Township, Bridge Rehabilitation 1,050,000 2 (Base Construction Allocation - 3 $750,000) 4 (Land Allocation - $50,000) 5 (Design and Contingencies - $250,000) 6 (92) SR 0038, Concord Bridge, Concord 7 Township, Bridge Rehabilitation 1,050,000 8 (Base Construction Allocation - 9 $750,000) 10 (Land Allocation - $50,000) 11 (Design and Contingencies - $250,000) 12 (93) SR 0038, Little Connoquenessing Creek 13 Bridge No.1, Concord Township, Bridge 14 Rehabilitation 1,050,000 15 (Base Construction Allocation - 16 $750,000) 17 (Land Allocation - $50,000) 18 (Design and Contingencies - $250,000) 19 (94) SR 0038, Little Connoquenessing Creek 20 Bridge, Concord Township, Bridge 21 Rehabilitation 1,050,000 22 (Base Construction Allocation - 23 $750,000) 24 (Land Allocation - $50,000) 25 (Design and Contingencies - $250,000) 26 (95) SR 0038, Little Scrubgrass Creek 27 Bridge, Allegheny Township, Bridge 28 Rehabilitation 1,050,000 29 (Base Construction Allocation - 30 $750,000) 19970S0186B0179 - 89 -
1 (Land Allocation - $50,000) 2 (Design and Contingencies - $250,000) 3 (96) SR 0038, Bridge over Tributary of 4 Scrubgrass Creek, Allegheny Township, 5 Bridge Rehabilitation 1,050,000 6 (Base Construction Allocation - 7 $750,000) 8 (Land Allocation - $50,000) 9 (Design and Contingencies - $250,000) 10 (97) SR 0058, Murrin Run Bridge, Venango 11 Township, Bridge Rehabilitation 1,050,000 12 (Base Construction Allocation - 13 $750,000) 14 (Land Allocation - $50,000) 15 (Design and Contingencies - $250,000) 16 (98) SR 0068, B&LE Railroad Bridge, Summit 17 and Butler Townships, Bridge 18 Rehabilitation 1,450,000 19 (Base Construction Allocation - 20 $1,000,000) 21 (Land Allocation - $100,000) 22 (Design and Contingencies - $350,000) 23 (99) SR 0068, Connoquenessing Creek 24 Bridge, Summit Township, Bridge 25 Rehabilitation 1,050,000 26 (Base Construction Allocation - 27 $750,000) 28 (Land Allocation - $50,000) 29 (Design and Contingencies - $250,000) 30 (100) SR 0068, Buffalo Creek Bridge, 19970S0186B0179 - 90 -
1 Chicora Township, Bridge 2 Rehabilitation 1,050,000 3 (Base Construction Allocation - 4 $750,000) 5 (Land Allocation - $50,000) 6 (Design and Contingencies - $250,000) 7 (101) SR 0068, Buffalo Run Bridge, 8 Fairview Township, Bridge 9 Rehabilitation 1,050,000 10 (Base Construction Allocation - 11 $750,000) 12 (Land Allocation - $50,000) 13 (Design and Contingencies - $250,000) 14 (102) SR 0079, Bridge over Tributary of 15 Glade Run, Jackson Township, Bridge 16 Rehabilitation 1,450,000 17 (Base Construction Allocation - 18 $1,000,000) 19 (Land Allocation - $100,000) 20 (Design and Contingencies - $350,000) 21 (103) SR 0079, Bridge No.1 over Branch of 22 Yellow Creek, Lancaster Township, 23 Bridge Rehabilitation 1,450,000 24 (Base Construction Allocation - 25 $1,000,000) 26 (Land Allocation - $100,000) 27 (Design and Contingencies - $350,000) 28 (104) SR 0079, Bridge No.2 over Branch of 29 Yellow Creek, Lancaster Township, 30 Bridge Rehabilitation 1,450,000 19970S0186B0179 - 91 -
1 (Base Construction Allocation - 2 $1,000,000) 3 (Land Allocation - $100,000) 4 (Design and Contingencies - $350,000) 5 (105) SR 0079, Bridge No.3 over Branch of 6 Yellow Creek, Lancaster Township, 7 Bridge Rehabilitation 1,450,000 8 (Base Construction Allocation - 9 $1,000,000) 10 (Land Allocation - $100,000) 11 (Design and Contingencies - $350,000) 12 (106) SR 0079, Little Yellow Creek Bridge, 13 Lancaster Township, Bridge 14 Rehabilitation 1,450,000 15 (Base Construction Allocation - 16 $1,000,000) 17 (Land Allocation - $100,000) 18 (Design and Contingencies - $350,000) 19 (107) SR 0079, Bridge No.4 over Branch of 20 Yellow Creek, Muddycreek Township, 21 Bridge Rehabilitation 1,450,000 22 (Base Construction Allocation - 23 $1,000,000) 24 (Land Allocation - $100,000) 25 (Design and Contingencies - $350,000) 26 (108) SR 0079, Bridge at Milepost 100, 27 Worth Township, Bridge Rehabilitation 1,450,000 28 (Base Construction Allocation - 29 $1,000,000) 30 (Land Allocation - $100,000) 19970S0186B0179 - 92 -
1 (Design and Contingencies - $350,000) 2 (109) SR 0079, Black Run Bridge, Worth 3 Township, Bridge Rehabilitation 1,450,000 4 (Base Construction Allocation - 5 $1,000,000) 6 (Land Allocation - $100,000) 7 (Design and Contingencies - $350,000) 8 (110) SR 0268, Bridge over Branch of Bear 9 Creek, Petrolia Borough, Bridge 10 Rehabilitation 1,050,000 11 (Base Construction Allocation - 12 $750,000) 13 (Land Allocation - $50,000) 14 (Design and Contingencies - $250,000) 15 (111) SR 0268, Lowrey Run Bridge, 16 Allegheny Township, Bridge 17 Rehabilitation 1,050,000 18 (Base Construction Allocation - 19 $750,000) 20 (Land Allocation - $50,000) 21 (Design and Contingencies - $250,000) 22 (112) SR 0308, B&LE Railroad Bridge, 23 Center Township, Bridge Rehabilitation 1,050,000 24 (Base Construction Allocation - 25 $750,000) 26 (Land Allocation - $50,000) 27 (Design and Contingencies - $250,000) 28 (113) SR 0308, Stony Run Bridge, Center 29 Township, Bridge Rehabilitation 1,050,000 30 (Base Construction Allocation - 19970S0186B0179 - 93 -
1 $750,000) 2 (Land Allocation - $50,000) 3 (Design and Contingencies - $250,000) 4 (114) SR 0356, Little Buffalo Creek 5 Bridge, Buffalo Township, Bridge 6 Rehabilitation 1,050,000 7 (Base Construction Allocation - 8 $750,000) 9 (Land Allocation - $50,000) 10 (Design and Contingencies - $250,000) 11 (115) SR 0356, Big Coal Run Bridge, Summit 12 Township, Bridge Rehabilitation 1,050,000 13 (Base Construction Allocation - 14 $750,000) 15 (Land Allocation - $50,000) 16 (Design and Contingencies - $250,000) 17 (116) SR 0422, Lake Arthur Bridge, 18 Franklin Township, Bridge 19 Rehabilitation 1,450,000 20 (Base Construction Allocation - 21 $1,000,000) 22 (Land Allocation - $100,000) 23 (Design and Contingencies - $350,000) 24 (117) SR 0422, Big Run Bridge, Franklin 25 Township, Bridge Rehabilitation 1,450,000 26 (Base Construction Allocation - 27 $1,000,000) 28 (Land Allocation - $100,000) 29 (Design and Contingencies - $350,000) 30 (118) SR 0422, Mulligan Run Bridge, 19970S0186B0179 - 94 -
1 Franklin Township, Bridge 2 Rehabilitation 1,450,000 3 (Base Construction Allocation - 4 $1,000,000) 5 (Land Allocation - $100,000) 6 (Design and Contingencies - $350,000) 7 (119) SR 0422, Big Mulligan Run Bridge, 8 Franklin Township, Bridge 9 Rehabilitation 1,450,000 10 (Base Construction Allocation - 11 $1,000,000) 12 (Land Allocation - $100,000) 13 (Design and Contingencies - $350,000) 14 (120) SR 0422, Big Sullivan Run Bridge, 15 Butler Township, Bridge Rehabilitation 1,450,000 16 (Base Construction Allocation - 17 $1,000,000) 18 (Land Allocation - $100,000) 19 (Design and Contingencies - $350,000) 20 (121) SR 0422, Connoquenessing Creek 21 Bridge, Butler Township, Bridge 22 Rehabilitation 1,450,000 23 (Base Construction Allocation - 24 $1,000,000) 25 (Land Allocation - $100,000) 26 (Design and Contingencies - $350,000) 27 (122) SR 0422, Bridge No.1 over Tributary 28 of Connoquenessing Creek, Summit 29 Township, Bridge Rehabilitation 1,450,000 30 (Base Construction Allocation - 19970S0186B0179 - 95 -
1 $1,000,000) 2 (Land Allocation - $100,000) 3 (Design and Contingencies - $350,000) 4 (123) SR 0422, Bridge No.2 over Tributary 5 of Bonnie Brook, Butler Township, 6 Bridge Rehabilitation 1,450,000 7 (Base Construction Allocation - 8 $1,000,000) 9 (Land Allocation - $100,000) 10 (Design and Contingencies - $350,000) 11 (124) SR 0422, Bonnie Brook Bridge No.1, 12 Summit Township, Bridge Rehabilitation 1,450,000 13 (Base Construction Allocation - 14 $1,000,000) 15 (Land Allocation - $100,000) 16 (Design and Contingencies - $350,000) 17 (125) SR 0422, Bridge No.3 over Tributary 18 of Bonnie Brook, Summit Township, 19 Bridge Rehabilitation 1,450,000 20 (Base Construction Allocation - 21 $1,000,000) 22 (Land Allocation - $100,000) 23 (Design and Contingencies - $350,000) 24 (126) SR 0422, Bonnie Brook Bridge No.2, 25 Summit Township, Bridge Rehabilitation 1,450,000 26 (Base Construction Allocation - 27 $1,000,000) 28 (Land Allocation - $100,000) 29 (Design and Contingencies - $350,000) 30 (127) SR 0422, Bridge No.4 over Tributary 19970S0186B0179 - 96 -
1 of Bonnie Brook, Summit Township, 2 Bridge Rehabilitation 1,450,000 3 (Base Construction Allocation - 4 $1,000,000) 5 (Land Allocation - $100,000) 6 (Design and Contingencies - $350,000) 7 (128) SR 0422, Little Buffalo Creek 8 Bridge, Clearfield Township, Bridge 9 Rehabilitation 1,450,000 10 (Base Construction Allocation - 11 $1,000,000) 12 (Land Allocation - $100,000) 13 (Design and Contingencies - $350,000) 14 (129) SR 0422, Buffalo Creek Bridge, 15 Clearfield Township, Bridge 16 Rehabilitation 1,450,000 17 (Base Construction Allocation - 18 $1,000,000) 19 (Land Allocation - $100,000) 20 (Design and Contingencies - $350,000) 21 (130) SR 0528, Likens Run Bridge, Evans 22 City Borough, Bridge Rehabilitation 1,050,000 23 (Base Construction Allocation - 24 $750,000) 25 (Land Allocation - $50,000) 26 (Design and Contingencies - $250,000) 27 (131) SR 1010, Glade Run Bridge, Brady 28 Township, Bridge Rehabilitation 595,000 29 (Base Construction Allocation - 30 $400,000) 19970S0186B0179 - 97 -
1 (Land Allocation - $20,000) 2 (Design and Contingencies - $175,000) 3 (132) SR 1010, Big Bear Creek Bridge, 4 Fairview Township, Bridge 5 Rehabilitation 595,000 6 (Base Construction Allocation - 7 $400,000) 8 (Land Allocation - $20,000) 9 (Design and Contingencies - $175,000) 10 (133) SR 1011, Buffalo Creek Bridge, 11 Fairview Township, Bridge 12 Rehabilitation 595,000 13 (Base Construction Allocation - 14 $400,000) 15 (Land Allocation - $20,000) 16 (Design and Contingencies - $175,000) 17 (134) SR 1019, Big Buffalo Run Bridge, 18 Donegal Township, Bridge 19 Rehabilitation 1,050,000 20 (Base Construction Allocation - 21 $750,000) 22 (Land Allocation - $50,000) 23 (Design and Contingencies - $250,000) 24 (135) SR 1025, Bonnie Brook Bridge, Summit 25 Township, Bridge Rehabilitation 1,050,000 26 (Base Construction Allocation - 27 $750,000) 28 (Land Allocation - $50,000) 29 (Design and Contingencies - $250,000) 30 (136) SR 2002, Coal Run Bridge, City of 19970S0186B0179 - 98 -
1 Butler and Butler Township, Bridge 2 Rehabilitation 1,050,000 3 (Base Construction Allocation - 4 $750,000) 5 (Land Allocation - $50,000) 6 (Design and Contingencies - $250,000) 7 (137) SR 2004, Bonnie Brook Bridge, Summit 8 Township, Bridge Rehabilitation 1,050,000 9 (Base Construction Allocation - 10 $750,000) 11 (Land Allocation - $50,000) 12 (Design and Contingencies - $250,000) 13 (138) SR 2012, Thorn Creek Bridge No.1, 14 Jefferson Township, Bridge 15 Rehabilitation 1,050,000 16 (Base Construction Allocation - 17 $750,000) 18 (Land Allocation - $50,000) 19 (Design and Contingencies - $250,000) 20 (139) SR 2012, Thorn Creek Bridge No.2, 21 Jefferson Township, Bridge 22 Rehabilitation 1,050,000 23 (Base Construction Allocation - 24 $750,000) 25 (Land Allocation - $50,000) 26 (Design and Contingencies - $250,000) 27 (140) SR 3001, West Butler Creek Bridge, 28 Butler Township, Bridge Rehabilitation 1,450,000 29 (Base Construction Allocation - 30 $1,000,000) 19970S0186B0179 - 99 -
1 (Land Allocation - $100,000) 2 (Design and Contingencies - $350,000) 3 (141) SR 3007, Thorn Creek Bridge, Butler 4 Township, Bridge Rehabilitation 1,050,000 5 (Base Construction Allocation - 6 $750,000) 7 (Land Allocation - $50,000) 8 (Design and Contingencies - $250,000) 9 (142) SR 3009, Cranberry Run Bridge, Penn 10 Township, Bridge Rehabilitation 595,000 11 (Base Construction Allocation - 12 $400,000) 13 (Land Allocation - $20,000) 14 (Design and Contingencies - $175,000) 15 (143) SR 3010, Saw Mill Run Bridge, Penn 16 Township, Bridge Rehabilitation 595,000 17 (Base Construction Allocation - 18 $400,000) 19 (Land Allocation - $20,000) 20 (Design and Contingencies - $175,000) 21 (144) SR 3015, Bridge No.2 over Tributary 22 of Wolf Run, Forward Township, Bridge 23 Rehabilitation 1,050,000 24 (Base Construction Allocation - 25 $750,000) 26 (Land Allocation - $50,000) 27 (Design and Contingencies - $250,000) 28 (145) SR 3015, Bridge No.3 over Tributary 29 of Wolf Run, Forward Township, Bridge 30 Rehabilitation 1,050,000 19970S0186B0179 - 100 -
1 (Base Construction Allocation - 2 $750,000) 3 (Land Allocation - $50,000) 4 (Design and Contingencies - $250,000) 5 (146) SR 3025, Bridge over Branch of 6 Yellow Creek, Lancaster Township, 7 Bridge Rehabilitation 595,000 8 (Base Construction Allocation - 9 $400,000) 10 (Land Allocation - $20,000) 11 (Design and Contingencies - $175,000) 12 (147) SR 3031, SR 3031 over US 422, Butler 13 Township, Bridge Rehabilitation 595,000 14 (Base Construction Allocation - 15 $400,000) 16 (Land Allocation - $20,000) 17 (Design and Contingencies - $175,000) 18 (148) SR 3034, Bridge over Branch of 19 Semiconon, Prospect Borough, Bridge 20 Rehabilitation 595,000 21 (Base Construction Allocation - 22 $400,000) 23 (Land Allocation - $20,000) 24 (Design and Contingencies - $175,000) 25 (149) SR 4001, SR 4001 over US 422, Butler 26 Township, Bridge Rehabilitation 1,050,000 27 (Base Construction Allocation - 28 $750,000) 29 (Land Allocation - $50,000) 30 (Design and Contingencies - $250,000) 19970S0186B0179 - 101 -
1 (150) SR 4002, Bridge over Branch of Muddy 2 Creek, Clay Township, Bridge 3 Rehabilitation 1,050,000 4 (Base Construction Allocation - 5 $750,000) 6 (Land Allocation - $50,000) 7 (Design and Contingencies - $250,000) 8 (151) T-716, Old Plank Road Bridge, Penn 9 Township, Bridge Replacement 390,000 10 (Base Construction Allocation - 11 $300,000) 12 (Land Allocation - $10,000) 13 (Design and Contingencies - $80,000) 14 (152) SR 3007, Crooked Run Bridge, Center 15 Township, Bridge Replacement 1,050,000 16 (Base Construction Allocation - 17 $750,000) 18 (Land Allocation - $50,000) 19 (Design and Contingencies - $250,000) 20 (153) SR 3010, Glade Run Bridge, Forward 21 Township, Bridge Replacement 595,000 22 (Base Construction Allocation - 23 $400,000) 24 (Land Allocation - $20,000) 25 (Design and Contingencies - $175,000) 26 (154) SR 3013, Big Connoquessing Bridge, 27 Forward Township, Bridge Replacement 595,000 28 (Base Construction Allocation - 29 $400,000) 30 (Land Allocation - $20,000) 19970S0186B0179 - 102 -
1 (Design and Contingencies - $175,000) 2 (155) SR 0019, SR 0019 over Brush Creek, 3 Cranberry Township, Bridge Replacement 1,050,000 4 (Base Construction Allocation - 5 $800,000) 6 (Land Allocation - $75,000) 7 (Design and Contingencies - $175,000) 8 (156) SR 0079, SR 0079 over Big Brush 9 Creek, Cranberry Township, Bridge 10 Replacement 1,450,000 11 (Base Construction Allocation - 12 $1,100,000) 13 (Land Allocation - $75,000) 14 (Design and Contingencies - $275,000) 15 (157) SR 0079, SR 0079 over Coal Run, 16 Cranberry Township, Bridge Replacement 1,450,000 17 (Base Construction Allocation - 18 $1,100,000) 19 (Land Allocation - $75,000) 20 (Design and Contingencies - $275,000) 21 (158) SR 0228, SR 0228 over CSX Railroad, 22 Adams Township, Bridge Replacement 1,450,000 23 (Base Construction Allocation - 24 $1,100,000) 25 (Land Allocation - $75,000) 26 (Design and Contingencies - $275,000) 27 (159) SR 3015, Breakneck Bridge, Adams 28 Township, Bridge Replacement 595,000 29 (Base Construction Allocation - 30 $400,000) 19970S0186B0179 - 103 -
1 (Land Allocation - $20,000) 2 (Design and Contingencies - $175,000) 3 (160) SR 3022, SR 3022 over Brush Creek, 4 Cranberry Township, Bridge Replacement 1,050,000 5 (Base Construction Allocation - 6 $800,000) 7 (Land Allocation - $75,000) 8 (Design and Contingencies - $175,000) 9 (161) SR 3024, SR 3024 over Big Brush 10 Creek, Cranberry Township, Bridge 11 Replacement 595,000 12 (Base Construction Allocation - 13 $400,000) 14 (Land Allocation - $20,000) 15 (Design and Contingencies - $175,000) 16 Section 15. Cambria County 17 (a) Local Bridges 18 (1) Summerhill Township, T-346, Bridge 19 No.1, Howard Avenue over Beaverdam Run, 20 Bridge Replacement 450,000 21 (Base Construction Allocation - 22 $350,000) 23 (Design and Contingencies - $100,000) 24 (2) West Carroll Township, T-505 over 25 Blacklick Creek, Bridge Replacement 235,000 26 (Base Construction Allocation - 27 $200,000) 28 (Land Allocation - $10,000) 29 (Design and Contingencies - $25,000) 30 (3) West Carroll Township, T-626 over Fox 19970S0186B0179 - 104 -
1 Run, Bridge Replacement 235,000 2 (Base Construction Allocation - 3 $200,000) 4 (Land Allocation - $10,000) 5 (Design and Contingencies - $25,000) 6 (b) State Bridges 7 (1) SR 1030, Carl Road over Slate Lick 8 Creek, Clearfield Township, Bridge 9 Replacement 240,000 10 (Base Construction Allocation - 11 $200,000) 12 (Land Allocation - $10,000) 13 (Design and Contingencies - $30,000) 14 Section 16. (Reserved). 15 Section 17. Carbon County. 16 (a) Local Bridges 17 (1) Penn Forest Township, T-481, County 18 Bridge No.21 over Panther Creek, Bridge 19 Replacement 290,000 20 (Base Construction Allocation - 21 $180,000) 22 (Land Allocation - $10,000) 23 (Design and Contingencies - $100,000) 24 (b) State Bridges 25 (1) SR 2002, Delaware Avenue over Palmer 26 Creek, Palmerton Borough, Bridge 27 Replacement 568,000 28 (Base Construction Allocation - 29 $318,000) 30 (Land Allocation - $150,000) 19970S0186B0179 - 105 -
1 (Design and Contingencies - $100,000) 2 (2) SR 4010, SR 4010 over Quakake Creek, 3 Packer Township, Bridge Replacement 412,000 4 (Base Construction Allocation - 5 $202,000) 6 (Land Allocation - $150,000) 7 (Design and Contingencies - $60,000) 8 (3) SR 0209, SR 0209 Turnpike Ramp, 9 Mahoning Interchange, Franklin 10 Township, Bridge Replacement 1,260,000 11 (Base Construction Allocation - 12 $750,000) 13 (Land Allocation - $300,000) 14 (Design and Contingencies - $210,000) 15 (4) SR 0248, SR 0248 over Pohopoco Creek, 16 Parryville Borough Line, Lower 17 Towamensing Township, Bridge 18 Rehabilitation 415,000 19 (Base Construction Allocation - 20 $315,000) 21 (Design and Contingencies - $100,000) 22 (5) SR 4010, SR 4010 over Hartz Creek, 23 Packer Township, Bridge Replacement 615,000 24 (Base Construction Allocation - 25 $370,000) 26 (Land Allocation - $150,000) 27 (Design and Contingencies - $95,000) 28 (6) SR 0534, SR 0534 over Sand Spring Run, 29 2 Miles South of Lehigh Tannery, Kidder 30 Township, Bridge Replacement 340,000 19970S0186B0179 - 106 -
1 (Base Construction Allocation - 2 $160,000) 3 (Land Allocation - $125,000) 4 (Design and Contingencies - $55,000) 5 (7) SR 0209, SR 0209 over Pohopoco Creek, 6 Village of Harrity, Franklin Township, 7 Bridge Rehabilitation 885,000 8 (Base Construction Allocation - 9 $680,000) 10 (Design and Contingencies - $205,000) 11 (8) SR 0534, Pa 534 over I-80, Kidder 12 Township, Bridge Rehabilitation 540,000 13 (Base Construction Allocation - 14 $440,000) 15 (Design and Contingencies - $100,000) 16 Section 18. Centre County. 17 (a) Local Bridges 18 (1) Greene Township, T-350, Stover Road 19 Bridge, Bridge Replacement 230,000 20 (Base Construction Allocation - 21 $180,000) 22 (Land Allocation - $10,000) 23 (Design and Contingencies - $40,000) 24 (2) Howard Township, T-398 over Bullit 25 Run, Bridge Rehabilitation 11,000 26 (Base Construction Allocation - $9,000) 27 (Design and Contingencies - $2,000) 28 (3) Halfmoon Township, T-307 over 29 Loveville Creek, Bridge Replacement 21,000 30 (Base Construction Allocation - 19970S0186B0179 - 107 -
1 $19,000) 2 (Design and Contingencies - $2,000) 3 (4) Penn Township, T-839 over Pine Creek, 4 Bridge Rehabilitation 80,000 5 (Base Construction Allocation - 6 $60,000) 7 (Design and Contingencies - $20,000) 8 (5) Port Matilda Borough, Pedestrian 9 Bridge over Bald Eagle Creek, Bridge 10 Rehabilitation 200,000 11 (Base Construction Allocation - 12 $175,000) 13 (Design and Contingencies - $25,000) 14 (6) Spring Township, T-367, Hill Road 15 Bridge, Bridge Replacement 200,000 16 (Base Construction Allocation - 17 $150,000) 18 (Land Allocation - $10,000) 19 (Design and Contingencies - $40,000) 20 (b) State Bridges 21 (1) SR 0080, I-80 Viaduct over Moshannon 22 Creek and Conrail, Rush Township, 23 Bridge Rehabilitation 14,510,000 24 (Base Construction Allocation - 25 $13,210,000) 26 (Design and Contingencies - $1,300,000) 27 (2) SR 1002, Marsh Creek Bridge over Marsh 28 Creek, Boggs Township, Bridge 29 Replacement 760,000 30 (Base Construction Allocation - 19970S0186B0179 - 108 -
1 $630,000) 2 (Land Allocation - $20,000) 3 (Design and Contingencies - $110,000) 4 (3) SR 1002, Little Marsh Creek Bridge 5 over Little Marsh Creek, Curtin 6 Township, Bridge Replacement 700,000 7 (Base Construction Allocation - 8 $600,000) 9 (Land Allocation - $20,000) 10 (Design and Contingencies - $80,000) 11 (4) SR 2012, Penns Creek Bridge Northwest 12 of the Village of Spring Mills, Gregg 13 Township, Bridge Replacement 470,000 14 (Base Construction Allocation - 15 $360,000) 16 (Land Allocation - $20,000) 17 (Design and Contingencies - $90,000) 18 (5) SR 0220, SR 0220 over Laurel Run, Port 19 Matilda Borough, Bridge Rehabilitation 450,000 20 (Base Construction Allocation - 21 $400,000) 22 (Design and Contingencies - $50,000) 23 Section 19. Chester County. 24 (a) Local Bridges 25 (1) Parkesburg Borough, State Street 26 Pedestrian Bridge over Amtrak, Bridge 27 Replacement 1,700,000 28 (Base Construction Allocation - 29 $1,000,000) 30 (Land Allocation - $500,000) 19970S0186B0179 - 109 -
1 (Design and Contingencies - $200,000) 2 (2) East Fallowfield Township, T-362, 3 Timacuia Road under Penn Central 4 Railroad, Bridge Removal 445,000 5 (Base Construction Allocation - 6 $400,000) 7 (Land Allocation - $30,000) 8 (Design and Contingencies - $15,000) 9 (3) East Marlborough Township, T-402, 10 County Bridge No.65, Mill Road Bridge 11 over West Branch of Red Clay Creek, 12 Bridge Replacement 345,000 13 (Base Construction Allocation - 14 $291,000) 15 (Land Allocation - $25,000) 16 (Design and Contingencies - $29,000) 17 (4) Oxford Borough, Broad Street Bridge 18 over SEPTA, Bridge Replacement 1,304,000 19 (Base Construction Allocation - 20 $1,125,000) 21 (Land Allocation - $20,000) 22 (Design and Contingencies - $159,000) 23 (5) Penn Township, County Bridge No.260, 24 Posey Mill Road Bridge over Big Elk 25 Creek, Bridge Replacement 425,000 26 (Base Construction Allocation - 27 $300,000) 28 (Land Allocation - $25,000) 29 (Design and Contingencies - $100,000) 30 (6) Tredyffrin Township, Old Lancaster 19970S0186B0179 - 110 -
1 Pike Bridge over Amtrak, Bridge 2 Rehabilitation 465,000 3 (Base Construction Allocation - 4 $400,000) 5 (Land Allocation - $30,000) 6 (Design and Contingencies - $35,000) 7 (7) Tredyffrin Township, T-807, Evans Road 8 Bridge over Conrail, Bridge 9 Replacement 195,000 10 (Base Construction Allocation - 11 $150,000) 12 (Land Allocation - $30,000) 13 (Design and Contingencies - $15,000) 14 (8) West Caln and West Brandywine 15 Townships, County Bridge No.283, Reid 16 Road Bridge over West Branch of 17 Brandywine Creek, Bridge Replacement 740,000 18 (Base Construction Allocation - 19 $600,000) 20 (Land Allocation - $40,000) 21 (Design and Contingencies - $100,000) 22 (9) West Goshen Township, T-210, Old 23 Eachus Mill Road Bridge over SEPTA, 24 Bridge Replacement 615,000 25 (Base Construction Allocation - 26 $500,000) 27 (Land Allocation - $15,000) 28 (Design and Contingencies - $100,000) 29 (10) West Goshen Township, T-328, Bridge 30 over Penn Central Railroad, Bridge 19970S0186B0179 - 111 -
1 Removal 132,000 2 (Base Construction Allocation - 3 $110,000) 4 (Land Allocation - $5,000) 5 (Design and Contingencies - $17,000) 6 (11) West Marlborough Township, T-368, 7 Creek Road Bridge under Penn Central 8 Railroad, Bridge Removal 580,000 9 (Base Construction Allocation - 10 $500,000) 11 (Land Allocation - $5,000) 12 (Design and Contingencies - $75,000) 13 (12) West Marlborough Township, Bridge 14 over Doe Run, Bridge Replacement 915,000 15 (Base Construction Allocation - 16 $750,000) 17 (Land Allocation - $25,000) 18 (Design and Contingencies - $140,000) 19 (13) East Coventry Township, Zeiber Road 20 over Pigeon Creek, Bridge Replacement 375,000 21 (Base Construction Allocation - 22 $300,000) 23 (Land Allocation - $15,000) 24 (Design and Contingencies - $60,000) 25 (14) South Coventry Township, Young Road 26 over Pigeon Creek, Bridge 27 Rehabilitation 6,000 28 (Base Construction Allocation - $6,000) 29 (b) State Bridges 30 (1) SR 1010, Swedesford Road Bridge over 19970S0186B0179 - 112 -
1 US 422, Drummers Lane and Warner Road, 2 Tredyffrin, Chester County, Upper 3 Merion, Montgomery County, Bridge 4 Replacement 6,795,000 5 (Base Construction Allocation - 6 $6,210,000) 7 (Land Allocation - $180,000) 8 (Design and Contingencies - $405,000) 9 (2) SR 1045, Hares Hill Road Bridge over 10 French Creek, East Pikeland Township, 11 Bridge Rehabilitation 1,000,000 12 (Base Construction Allocation - 13 $740,000) 14 (Land Allocation - $60,000) 15 (Design and Contingencies - $200,000) 16 (3) SR 3014, Lees Road Bridge over Black 17 Run, West Nottingham Township, Bridge 18 Replacement 1,125,000 19 (Base Construction Allocation - 20 $850,000) 21 (Land Allocation - $75,000) 22 (Design and Contingencies - $200,000) 23 (4) SR 3030, Street Road Bridge over 24 Octoraro Creek, Upper Oxford Township, 25 Bridge Replacement 1,875,000 26 (Base Construction Allocation - 27 $1,600,000) 28 (Land Allocation - $75,000) 29 (Design and Contingencies - $200,000) 30 (5) SR 0003, Gay Street Bridge over 19970S0186B0179 - 113 -
1 Abandoned Conrail, West Chester 2 Borough, Bridge Removal 180,000 3 (Base Construction Allocation - 4 $150,000) 5 (Land Allocation - $10,000) 6 (Design and Contingencies - $20,000) 7 (6) SR 0842, Shaws Bridges (Two Bridges) 8 over Branch of Brandywine Creek, East 9 Bradford and Pocopson Townships, Bridge 10 Replacement 1,500,000 11 (Base Construction Allocation - 12 $1,288,000) 13 (Land Allocation - $100,000) 14 (Design and Contingencies - $112,000) 15 (7) SR 0842, Bridge Road Bridge over East 16 Branch of Brandywine Creek, East 17 Bradford Township, Bridge Painting 214,000 18 (Base Construction Allocation - 19 $186,000) 20 (Design and Contingencies - $28,000) 21 (8) SR 1049, Rapp's Dam Covered Bridge, 22 East Pikeland Township, Bridge 23 Painting 47,000 24 (Base Construction Allocation - 25 $41,000) 26 (Design and Contingencies - $6,000) 27 (9) SR 2011, Phoenixville Pike Bridge 28 under Abandoned Penn Central Railroad, 29 West Goshen Township, Bridge Removal 125,000 30 (Base Construction Allocation - 19970S0186B0179 - 114 -
1 $100,000) 2 (Land Allocation - $10,000) 3 (Design and Contingencies - $15,000) 4 (10) SR 2018, Green Hill Road Bridge under 5 Abandoned Penn Central Railroad, West 6 Goshen Township, Bridge Removal 125,000 7 (Base Construction Allocation - 8 $100,000) 9 (Land Allocation - $10,000) 10 (Design and Contingencies - $15,000) 11 (11) SR 3045, Springdell Road Bridge under 12 Abandoned Penn Central Railroad, West 13 Marborough Township, Bridge Removal 125,000 14 (Base Construction Allocation - 15 $100,000) 16 (Land Allocation - $10,000) 17 (Design and Contingencies - $15,000) 18 (12) SR 3049, Hilltop View Road Bridge 19 over Buck and Doe Run Creek, Newlin 20 Township, Bridge Replacement 1,450,000 21 (Base Construction Allocation - 22 $1,300,000) 23 (Land Allocation - $50,000) 24 (Design and Contingencies - $100,000) 25 (13) SR 1012, Bridge over Trout Creek, 26 Tredyffrin Township, Bridge 27 Replacement 850,000 28 (Base Construction Allocation - 29 $550,000) 30 (Land Allocation - $50,000) 19970S0186B0179 - 115 -
1 (Design and Contingencies - $250,000) 2 Section 20. Clarion County. 3 (a) Local Bridges 4 (1) Beaver Township, T-400, Canoe Creek 5 Bridge over Canoe Creek, Bridge 6 Replacement 380,000 7 (Base Construction Allocation - 8 $300,000) 9 (Land Allocation - $10,000) 10 (Design and Contingencies - $70,000) 11 (2) Beaver Township, T-422, Deer Creek 12 Bridge over Deer Creek, Bridge 13 Replacement 540,000 14 (Base Construction Allocation - 15 $450,000) 16 (Land Allocation - $30,000) 17 (Design and Contingencies - $60,000) 18 (3) Clarion and Millcreek Townships, T- 19 490, Mill Creek Bridge over Mill Creek, 20 Bridge Replacement 540,000 21 (Base Construction Allocation - 22 $450,000) 23 (Land Allocation - $10,000) 24 (Design and Contingencies - $80,000) 25 (4) Elk Township, T-424, Deer Creek Bridge 26 over Deer Creek, Bridge Replacement 545,000 27 (Base Construction Allocation - 28 $425,000) 29 (Land Allocation - $20,000) 30 (Design and Contingencies - $100,000) 19970S0186B0179 - 116 -
1 (5) Farmington Township, T-562, Walley Run 2 Bridge over Walley Run, Bridge 3 Replacement 375,000 4 (Base Construction Allocation - 5 $300,000) 6 (Land Allocation - $5,000) 7 (Design and Contingencies - $70,000) 8 (6) Knox Township, T-850, Toby Creek 9 Bridge over Toby Creek, Bridge 10 Replacement 480,000 11 (Base Construction Allocation - 12 $400,000) 13 (Land Allocation - $20,000) 14 (Design and Contingencies - $60,000) 15 (7) Knox Township, T-600, Licking Creek 16 Bridge over Licking Creek, Bridge 17 Replacement 445,000 18 (Base Construction Allocation - 19 $350,000) 20 (Land Allocation - $15,000) 21 (Design and Contingencies - $80,000) 22 (8) Madison Township, T-460, Red Bank 23 Creek Bridge over Tributary of Red Bank 24 Creek, Bridge Replacement 390,000 25 (Base Construction Allocation - 26 $300,000) 27 (Land Allocation - $20,000) 28 (Design and Contingencies - $70,000) 29 (9) Porter Township, T-462, Fiddlers Run 30 Bridge over Fiddlers Run, Bridge 19970S0186B0179 - 117 -
1 Replacement 390,000 2 (Base Construction Allocation - 3 $300,000) 4 (Land Allocation - $10,000) 5 (Design and Contingencies - $80,000) 6 (10) Porter Township, T-472, Leatherwood 7 Creek Bridge over Leatherwood Creek, 8 Bridge Replacement 455,000 9 (Base Construction Allocation - 10 $375,000) 11 (Land Allocation - $20,000) 12 (Design and Contingencies - $60,000) 13 (11) Porter Township, T-750, Leisure Run 14 Bridge over Leisure Run, Bridge 15 Replacement 390,000 16 (Base Construction Allocation - 17 $300,000) 18 (Land Allocation - $10,000) 19 (Design and Contingencies - $80,000) 20 (12) Red Bank Township, T-840, Beaver 21 Creek Bridge over Beaver Creek, Bridge 22 Replacement 420,000 23 (Base Construction Allocation - 24 $350,000) 25 (Land Allocation - $15,000) 26 (Design and Contingencies - $55,000) 27 (13) Red Bank Township, T-508, County 28 Bridge No.46, Pine Creek Bridge over 29 Pine Creek, Bridge Replacement 378,000 30 (Base Construction Allocation - 19970S0186B0179 - 118 -
1 $300,000) 2 (Land Allocation - $8,000) 3 (Design and Contingencies - $70,000) 4 (14) Richland Township, T-382, Turkey Run 5 Bridge over Turkey Run, Bridge 6 Replacement 360,000 7 (Base Construction Allocation - 8 $300,000) 9 (Land Allocation - $10,000) 10 (Design and Contingencies - $50,000) 11 (15) Richland Township, T-382, Turkey Run 12 Bridge over Turkey Run, Bridge 13 Replacement 360,000 14 (Base Construction Allocation - 15 $300,000) 16 (Land Allocation - $10,000) 17 (Design and Contingencies - $50,000) 18 (16) Sligo Borough, Madison Street Bridge 19 over Little Licking Creek, Bridge 20 Replacement 445,000 21 (Base Construction Allocation - 22 $350,000) 23 (Land Allocation - $15,000) 24 (Design and Contingencies - $80,000) 25 (17) Beaver Township, T-332 over Beaver 26 Creek, Bridge Replacement 400,000 27 (Base Construction Allocation - 28 $275,000) 29 (Land Allocation - $50,000) 30 (Design and Contingencies - $75,000) 19970S0186B0179 - 119 -
1 (18) Beaver Township, T-385 over Canoe 2 Creek, Bridge Replacement 490,000 3 (Base Construction Allocation - 4 $320,000) 5 (Land Allocation - $80,000) 6 (Design and Contingencies - $90,000) 7 (19) Highland Township, T-573 over Toby 8 Creek, Bridge Replacement 500,000 9 (Base Construction Allocation - 10 $360,000) 11 (Land Allocation - $40,000) 12 (Design and Contingencies - $100,000) 13 (20) Knox Township, T-850 over Step Creek, 14 Bridge Replacement 240,000 15 (Base Construction Allocation - 16 $180,000) 17 (Land Allocation - $20,000) 18 (Design and Contingencies - $40,000) 19 (21) Perry Township, T-301, Bridge 20 Replacement 200,000 21 (Base Construction Allocation - 22 $130,000) 23 (Land Allocation - $30,000) 24 (Design and Contingencies - $40,000) 25 (22) Millcreek Township, T-564 over Little 26 Mill Creek, Bridge Replacement 380,000 27 (Base Construction Allocation - 28 $300,000) 29 (Land Allocation - $10,000) 30 (Design and Contingencies - $70,000) 19970S0186B0179 - 120 -
1 (23) Paint Township, T-578 over Step 2 Creek, Bridge Replacement 360,000 3 (Base Construction Allocation - 4 $300,000) 5 (Land Allocation - $10,000) 6 (Design and Contingencies - $50,000) 7 (24) Monroe Township, T-486, County Bridge 8 No.22 over Piney Creek, Bridge 9 Replacement 480,000 10 (Base Construction Allocation - 11 $400,000) 12 (Land Allocation - $10,000) 13 (Design and Contingencies - $70,000) 14 (25) Clarion Township, T-532 over Brush 15 Run, Bridge Replacement 245,000 16 (Base Construction Allocation - 17 $200,000) 18 (Land Allocation - $10,000) 19 (Design and Contingencies - $35,000) 20 (26) Clarion Township, T-561 over Jones 21 Run, Bridge Replacement 245,000 22 (Base Construction Allocation - 23 $200,000) 24 (Land Allocation - $10,000) 25 (Design and Contingencies - $35,000) 26 (27) Elk Township, T-582 over Mahles Run, 27 Bridge Replacement 245,000 28 (Base Construction Allocation - 29 $200,000) 30 (Land Allocation - $10,000) 19970S0186B0179 - 121 -
1 (Design and Contingencies - $35,000) 2 (28) Farmington Township, T-609 over Engle 3 Run, Bridge Replacement 245,000 4 (Base Construction Allocation - 5 $200,000) 6 (Land Allocation - $10,000) 7 (Design and Contingencies - $35,000) 8 (29) Paint Township, T-577 over Toby 9 Creek, Bridge Replacement 106,000 10 (Base Construction Allocation - 11 $100,000) 12 (Land Allocation - $1,000) 13 (Design and Contingencies - $5,000) 14 (30) Paint Township, T-576 over Toby 15 Creek, Bridge Replacement 106,000 16 (Base Construction Allocation - 17 $100,000) 18 (Land Allocation - $1,000) 19 (Design and Contingencies - $5,000) 20 (31) Beaver Township, T-405 over Canoe 21 Creek, Bridge Replacement 106,000 22 (Base Construction Allocation - 23 $100,000) 24 (Land Allocation - $1,000) 25 (Design and Contingencies - $5,000) 26 (32) Beaver Township, T-411 over Boyd Run, 27 Bridge Replacement 106,000 28 (Base Construction Allocation - 29 $100,000) 30 (Land Allocation - $1,000) 19970S0186B0179 - 122 -
1 (Design and Contingencies - $5,000) 2 (33) Elk Township, T-424 over Deer Creek, 3 Bridge Replacement 250,000 4 (Base Construction Allocation - 5 $200,000) 6 (Land Allocation - $10,000) 7 (Design and Contingencies - $40,000) 8 (b) State Bridges 9 (1) SR 0058, Callensburg Bridge over 10 Clarion River, Licking Township, Bridge 11 Painting 365,000 12 (Base Construction Allocation - 13 $350,000) 14 (Design and Contingencies - $15,000) 15 (2) SR 0080, Beaver Creek Eastbound Bridge 16 over Beaver Creek, Beaver Township, 17 Bridge Painting 390,000 18 (Base Construction Allocation - 19 $375,000) 20 (Design and Contingencies - $15,000) 21 (3) SR 0080, Beaver Creek Westbound Bridge 22 over Beaver Creek, Beaver Township, 23 Bridge Painting 390,000 24 (Base Construction Allocation - 25 $375,000) 26 (Design and Contingencies - $15,000) 27 (4) SR 0080, Canoe Creek Eastbound Bridge 28 over Canoe Creek, Beaver Township, 29 Bridge Painting 1,230,000 30 (Base Construction Allocation - 19970S0186B0179 - 123 -
1 $1,200,000) 2 (Design and Contingencies - $30,000) 3 (5) SR 0080, Canoe Creek Westbound Bridge 4 over Canoe Creek, Beaver Township, 5 Bridge Painting 1,290,000 6 (Base Construction Allocation - 7 $1,260,000) 8 (Design and Contingencies - $30,000) 9 (6) SR 0080, TR 558 Bridge over I-80, 10 Clarion Township, Bridge Painting 195,000 11 (Base Construction Allocation - 12 $180,000) 13 (Design and Contingencies - $15,000) 14 (7) SR 0322, Exit 11 Bridge over I-80, 15 Clarion Township, Clarion Bridge 16 Painting 205,000 17 (Base Construction Allocation - 18 $190,000) 19 (Design and Contingencies - $15,000) 20 (8) SR 0536, Mayport Bridge over Redbank 21 Creek, Red Bank Township, Bridge 22 Painting 215,000 23 (Base Construction Allocation - 24 $200,000) 25 (Design and Contingencies - $15,000) 26 (9) SR 1009, Brush Creek Bridge over Brush 27 Creek, Clarion Township, Bridge 28 Painting 70,000 29 (Base Construction Allocation - 30 $55,000) 19970S0186B0179 - 124 -
1 (Design and Contingencies - $15,000) 2 (10) SR 2001, Piney Creek Bridge over 3 Piney Creek, Limestone Township, Bridge 4 Painting 85,000 5 (Base Construction Allocation - 6 $70,000) 7 (Design and Contingencies - $15,000) 8 (11) SR 2001, Little Piney Creek Bridge 9 over Little Piney Creek, Limestone 10 Township, Bridge Painting 70,000 11 (Base Construction Allocation - 12 $55,000) 13 (Design and Contingencies - $15,000) 14 (12) SR 2005, Glade Run Bridge over Glade 15 Run, Limestone Township, Bridge 16 Painting 60,000 17 (Base Construction Allocation - 18 $45,000) 19 (Design and Contingencies - $15,000) 20 (13) SR 2007, Licking Creek Bridge over 21 Licking Creek, Monroe Township, Bridge 22 Painting 75,000 23 (Base Construction Allocation - 24 $60,000) 25 (Design and Contingencies - $15,000) 26 (14) SR 2009, Lawsonham Bridge over 27 Redbank Creek, Madison Township, Bridge 28 Painting 195,000 29 (Base Construction Allocation - 30 $180,000) 19970S0186B0179 - 125 -
1 (Design and Contingencies - $15,000) 2 (15) SR 2009, Wildcat Run Bridge over 3 Wildcat Run, Madison Township, Bridge 4 Painting 85,000 5 (Base Construction Allocation - 6 $70,000) 7 (Design and Contingencies - $15,000) 8 (16) SR 2015, Little Piney Creek Bridge 9 over Little Piney Creek, Limestone 10 Township, Bridge Painting 60,000 11 (Base Construction Allocation - 12 $45,000) 13 (Design and Contingencies - $15,000) 14 (17) SR 3020, Alum Rock Bridge over Turkey 15 Run, Richland Township, Bridge 16 Painting 75,000 17 (Base Construction Allocation - 18 $60,000) 19 (Design and Contingencies - $15,000) 20 (18) SR 4003, Turkey Run Bridge over 21 Turkey Run, Richland Township, Bridge 22 Painting 65,000 23 (Base Construction Allocation - 24 $50,000) 25 (Design and Contingencies - $15,000) 26 (19) SR 4005, Canoe Creek Bridge over 27 Canoe Creek, Beaver Township, Bridge 28 Painting 70,000 29 (Base Construction Allocation - 30 $55,000) 19970S0186B0179 - 126 -
1 (Design and Contingencies - $15,000) 2 (20) SR 0208, Conrail Overpass, Elk 3 Township, Bridge Removal 55,000 4 (Base Construction Allocation - 5 $50,000) 6 (Design and Contingencies - $5,000) 7 (21) SR 0322, Conrail Overpass, Elk 8 Township, Bridge Removal 210,000 9 (Base Construction Allocation - 10 $200,000) 11 (Design and Contingencies - $10,000) 12 (22) SR 1011, Lake Erie, Franklin and 13 Clarion Railroad Overpass, Clarion 14 Township, Bridge Removal 12,000 15 (Base Construction Allocation - 16 $10,000) 17 (Design and Contingencies - $2,000) 18 (23) SR 0066, Bridge over Piney Creek, 19 Limestone Township, Bridge Replacement 650,000 20 (Base Construction Allocation - 21 $500,000) 22 (Land Allocation - $20,000) 23 (Design and Contingencies - $130,000) 24 (24) SR 0066, Bridge over Little Piney 25 Creek, Limestone Township, Bridge 26 Replacement 600,000 27 (Base Construction Allocation - 28 $450,000) 29 (Land Allocation - $20,000) 30 (Design and Contingencies - $130,000) 19970S0186B0179 - 127 -
1 (25) SR 0068, Bridge over Brush Run, 2 Monroe Township, Bridge Replacement 650,000 3 (Base Construction Allocation - 4 $500,000) 5 (Land Allocation - $20,000) 6 (Design and Contingencies - $130,000) 7 (26) SR 0208, Bridge over Canoe Creek, 8 Beaver Township, Bridge Replacement 550,000 9 (Base Construction Allocation - 10 $400,000) 11 (Land Allocation - $20,000) 12 (Design and Contingencies - $130,000) 13 (27) SR 2001, Bridge over Little Piney 14 Creek, Limestone Township, Bridge 15 Replacement 490,000 16 (Base Construction Allocation - 17 $350,000) 18 (Land Allocation - $20,000) 19 (Design and Contingencies - $120,000) 20 (28) SR 0208, SR 0208 over Deer Creek, Elk 21 Township, Bridge Replacement 505,000 22 (Base Construction Allocation - 23 $450,000) 24 (Land Allocation - $5,000) 25 (Design and Contingencies - $50,000) 26 (29) SR 2007, SR 2007 over Deer Creek, 27 Beaver Township, Bridge Replacement 455,000 28 (Base Construction Allocation - 29 $400,000) 30 (Land Allocation - $5,000) 19970S0186B0179 - 128 -
1 (Design and Contingencies - $50,000) 2 (30) SR 4005, SR 4005 over Canoe Creek, 3 Beaver Township, Bridge Replacement 405,000 4 (Base Construction Allocation - 5 $350,000) 6 (Land Allocation - $5,000) 7 (Design and Contingencies - $50,000) 8 (31) SR 4008, SR 4008 over Paint Creek, 9 Knox Township, Bridge Replacement 505,000 10 (Base Construction Allocation - 11 $450,000) 12 (Land Allocation - $5,000) 13 (Design and Contingencies - $50,000) 14 Section 21. Clearfield County. 15 (a) Local Bridges 16 (1) Knox Township, T-565 Bridge over Potts 17 Run, Bridge Replacement 510,000 18 (Base Construction Allocation - 19 $350,000) 20 (Land Allocation - $10,000) 21 (Design and Contingencies - $150,000) 22 (2) Houtzdale Borough, McAteer Street 23 Bridge, Bridge Replacement 430,000 24 (Base Construction Allocation - 25 $270,000) 26 (Land Allocation - $20,000) 27 (Design and Contingencies - $140,000) 28 (3) Penn Township, T-461 over Bell Run, 29 Bridge Replacement 106,000 30 (Base Construction Allocation - 19970S0186B0179 - 129 -
1 $100,000) 2 (Land Allocation - $1,000) 3 (Design and Contingencies - $5,000) 4 (b) State Bridges 5 (1) SR 0879, Bridge over US 322 near 6 Clearfield Mall, Lawrence Township, 7 Bridge Painting 644,000 8 (Base Construction Allocation - 9 $614,000) 10 (Design and Contingencies - $30,000) 11 (2) SR 0729, Bridge over Muddy Run, 12 Beccaria Township, Bridge Painting 35,000 13 (Base Construction Allocation - 14 $30,000) 15 (Design and Contingencies - $5,000) 16 (3) SR 0879, Bridge over Susquehanna 17 River, Lawrence Township, Bridge 18 Painting 183,000 19 (Base Construction Allocation - 20 $163,000) 21 (Design and Contingencies - $20,000) 22 (4) SR 0970, Bridge over Moshannon Creek, 23 Osceola Mills, Bridge Painting 145,000 24 (Base Construction Allocation - 25 $120,000) 26 (Design and Contingencies - $25,000) 27 (5) SR 0970, Bridge over Susquehanna 28 River, Village of Shawville, Bridge 29 Painting 163,000 30 (Base Construction Allocation - 19970S0186B0179 - 130 -
1 $143,000) 2 (Design and Contingencies - $20,000) 3 (6) SR 1009, Bridge over Alder Run, Morris 4 Township, Bridge Painting 18,000 5 (Base Construction Allocation - 6 $15,000) 7 (Design and Contingencies - $3,000) 8 (7) SR 1014, Bridge over Alder Run, Graham 9 Township, Bridge Painting 18,000 10 (Base Construction Allocation - 11 $15,000) 12 (Design and Contingencies - $3,000) 13 (8) SR 2010, Bridge over Beaver Run, 14 Woodward Township, Bridge Painting 18,000 15 (Base Construction Allocation - 16 $15,000) 17 (Design and Contingencies - $3,000) 18 (9) SR 2024, Bridge over Conrail, Pike 19 Township, Bridge Painting 28,000 20 (Base Construction Allocation - 21 $24,000) 22 (Design and Contingencies - $4,000) 23 (10) SR 3001, Bridge over Chest Creek, 24 Mahaffey Borough, Bridge Replacement 1,750,000 25 (Base Construction Allocation - 26 $1,300,000) 27 (Land Allocation - $150,000) 28 (Design and Contingencies - $300,000) 29 (11) SR 3012, Bridge over Matthews Run, 30 Beccaria Township, Bridge Painting 18,000 19970S0186B0179 - 131 -
1 (Base Construction Allocation - 2 $15,000) 3 (Design and Contingencies - $3,000) 4 (12) SR 3012, Bridge over Clearfield 5 Creek, Beccaria Township, Bridge 6 Painting 100,000 7 (Base Construction Allocation - 8 $90,000) 9 (Design and Contingencies - $10,000) 10 (13) SR 0219, SR 0219 over Bear Run, Bell 11 Township, Bridge Replacement 505,000 12 (Base Construction Allocation - 13 $450,000) 14 (Land Allocation - $5,000) 15 (Design and Contingencies - $50,000) 16 Section 22. Clinton County. 17 (a) Local Bridges 18 (1) Mill Hall Borough, Church Street over 19 Fishing Creek, Bridge Rehabilitation 5,000 20 (Base Construction Allocation - $4,000) 21 (Design and Contingencies - $1,000) 22 (b) State Bridges 23 (1) SR 0044, Bridge over SR 0220, 1 Mile 24 Northeast of Avis, Pine Creek Township, 25 Bridge Painting 580,000 26 (Base Construction Allocation - 27 $525,000) 28 (Design and Contingencies - $55,000) 29 (2) SR 0080, Lamar Interchange (Two 30 Bridges) over PA 64 at Exit 25, Porter 19970S0186B0179 - 132 -
1 Township, Bridge Rehabilitation 4,100,000 2 (Base Construction Allocation - 3 $3,400,000) 4 (Design and Contingencies - $700,000) 5 (3) SR 0144, Bridge over Kettle Creek, 1 6 Mile East of Hammersley Fork, Leidy 7 Township, Bridge Painting 660,000 8 (Base Construction Allocation - 9 $600,000) 10 (Design and Contingencies - $60,000) 11 Section 23. Columbia County. 12 (a) Local Bridges (Reserved) 13 (b) State Bridges 14 (1) SR 0044, Chillisquaque Creek Bridge 15 over Chillisquaque Creek, 3 Miles 16 Northwest of Jerseytown, Bridge 17 Replacement 477,000 18 (Base Construction Allocation - 19 $382,000) 20 (Land Allocation - $24,000) 21 (Design and Contingencies - $71,000) 22 (2) SR 0093, Bridge over North Branch of 23 Briar Creek, Bridge Replacement 350,000 24 (Base Construction Allocation - 25 $275,000) 26 (Land Allocation - $15,000) 27 (Design and Contingencies - $60,000) 28 (3) SR 0093, Briar Creek Bridge over Briar 29 Creek, 3 Miles West of Berwick, Bridge 30 Replacement 392,000 19970S0186B0179 - 133 -
1 (Base Construction Allocation - 2 $315,000) 3 (Land Allocation - $18,000) 4 (Design and Contingencies - $59,000) 5 (4) SR 0239, West Creek Bridge over West 6 Creek, Southeast of Benton and 7 Sugarloaf Townships, Bridge 8 Replacement 670,000 9 (Base Construction Allocation - 10 $536,000) 11 (Land Allocation - $34,000) 12 (Design and Contingencies - $100,000) 13 (5) SR 0442, West Branch Run Bridge over 14 West Branch Run, 1.5 Miles North of 15 Iola, Bridge Replacement 206,000 16 (Base Construction Allocation - 17 $165,000) 18 (Land Allocation - $10,000) 19 (Design and Contingencies - $31,000) 20 (6) SR 1004, Erie-Lackawanna Railroad 21 Bridge, Viaduct over Conrail, South 22 Centre Township, Bridge Replacement 1,900,000 23 (Base Construction Allocation - 24 $1,600,000) 25 (Land Allocation - $110,000) 26 (Design and Contingencies - $190,000) 27 (7) SR 1019, Briar Creek Bridge over Briar 28 Creek, Briar Creek Township, Bridge 29 Replacement 404,000 30 (Base Construction Allocation - 19970S0186B0179 - 134 -
1 $323,000) 2 (Land Allocation - $20,000) 3 (Design and Contingencies - $61,000) 4 (8) SR 4012, Little Hemlock Creek Bridge 5 over Little Hemlock Creek, 10 Miles 6 Southeast of Jerseytown, Bridge 7 Replacement 284,000 8 (Base Construction Allocation - 9 $227,000) 10 (Land Allocation - $14,000) 11 (Design and Contingencies - $43,000) 12 (9) SR 4037, Mud Run Bridge over Mud Run, 13 5 Miles Northwest of Millville Borough, 14 Bridge Replacement 307,000 15 (Base Construction Allocation - 16 $246,000) 17 (Land Allocation - $15,000) 18 (Design and Contingencies - $46,000) 19 (10) SR 0011, Bridge over Fishing Creek, 20 Bridge Painting 530,000 21 (Base Construction Allocation - 22 $520,000) 23 (Design and Contingencies - $10,000) 24 (11) SR 1022, Bridge over Fishing Creek, 25 Bridge Painting 380,000 26 (Base Construction Allocation - 27 $370,000) 28 (Design and Contingencies - $10,000) 29 (12) SR 1022, Bridge over Old Channel, 30 Bridge Painting 125,000 19970S0186B0179 - 135 -
1 (Base Construction Allocation - 2 $115,000) 3 (Design and Contingencies - $10,000) 4 (13) SR 4009, Bridge over Fishing Creek, 5 Bridge Painting 315,000 6 (Base Construction Allocation - 7 $305,000) 8 (Design and Contingencies - $10,000) 9 (14) SR 0042, SR 0042 over Roaring Creek, 10 Conyngham Township, Bridge Replacement 457,000 11 (Base Construction Allocation - 12 $366,000) 13 (Land Allocation - $23,000) 14 (Design and Contingencies - $68,000) 15 (15) SR 0239, SR 0239 over West Creek, 16 Benton Township, Bridge Replacement 760,000 17 (Base Construction Allocation - 18 $560,000) 19 (Land Allocation - $35,000) 20 (Design and Contingencies - $165,000) 21 (16) SR 0254, SR 0254 over Little Fishing 22 Creek, Millville Borough, Bridge 23 Replacement 1,020,000 24 (Base Construction Allocation - 25 $816,000) 26 (Land Allocation - $51,000) 27 (Design and Contingencies - $153,000) 28 (17) SR 0339, SR 0339 over Beaver Run, 29 Beaver Township, Bridge Replacement 320,000 30 (Base Construction Allocation - 19970S0186B0179 - 136 -
1 $256,000) 2 (Land Allocation - $16,000) 3 (Design and Contingencies - $48,000) 4 (18) SR 0487, SR 0487 over Stony Brook, 5 Orange Township, Bridge Replacement 380,000 6 (Base Construction Allocation - 7 $304,000) 8 (Land Allocation - $19,000) 9 (Design and Contingencies - $57,000) 10 (19) SR 1014, SR 1014 over Little Briar 11 Creek, Briar Creek Township, Bridge 12 Replacement 415,000 13 (Base Construction Allocation - 14 $332,000) 15 (Land Allocation - $21,000) 16 (Design and Contingencies - $62,000) 17 (20) SR 1023, SR 1023 over East Briar 18 Creek, Briar Creek Township, Bridge 19 Replacement 520,000 20 (Base Construction Allocation - 21 $466,000) 22 (Land Allocation - $29,000) 23 (Design and Contingencies - $25,000) 24 (21) SR 2003, SR 2003 over Tributary of 25 Roaring Creek, Roaring Creek Township, 26 Bridge Replacement 171,000 27 (Base Construction Allocation - 28 $136,000) 29 (Land Allocation - $10,000) 30 (Design and Contingencies - $25,000) 19970S0186B0179 - 137 -
1 (22) SR 2003, SR 2003 over Tributary of 2 Roaring Creek, Locust Township, Bridge 3 Replacement 245,000 4 (Base Construction Allocation - 5 $196,000) 6 (Land Allocation - $12,000) 7 (Design and Contingencies - $37,000) 8 (23) SR 2009, SR 2009 over Catawissa 9 Creek, Main Township, Bridge 10 Replacement 436,000 11 (Base Construction Allocation - 12 $349,000) 13 (Land Allocation - $22,000) 14 (Design and Contingencies - $65,000) 15 (24) SR 4009, SR 4009 over Little Fishing 16 Creek, Mt. Pleasant Township, Bridge 17 Replacement 1,232,000 18 (Base Construction Allocation - 19 $986,000) 20 (Land Allocation - $61,000) 21 (Design and Contingencies - $185,000) 22 (25) SR 4033, SR 4033 over Wolfhouse Run, 23 Pine Township, Bridge Replacement 252,000 24 (Base Construction Allocation - 25 $202,000) 26 (Land Allocation - $12,000) 27 (Design and Contingencies - $38,000) 28 (26) SR 4045, SR 4045 over Green Creek, 29 Greenwood Township, Bridge Replacement 435,000 30 (Base Construction Allocation - 19970S0186B0179 - 138 -
1 $348,000) 2 (Land Allocation - $22,000) 3 (Design and Contingencies - $65,000) 4 (27) SR 4049, SR 4049 over Coles Creek, 5 Sugarloaf Township, Bridge Replacement 1,095,000 6 (Base Construction Allocation - 7 $876,000) 8 (Land Allocation - $55,000) 9 (Design and Contingencies - $164,000) 10 Section 24. Crawford County. 11 (a) Local Bridges 12 (1) Fairfield Township, T-636 over Branch 13 of French Creek, Bridge Replacement 108,000 14 (Base Construction Allocation - 15 $100,000) 16 (Land Allocation - $1,000) 17 (Design and Contingencies - $7,000) 18 (2) Fairfield Township, T-321 Bridge No.1 19 over Branch of French Creek, Bridge 20 Replacement 106,000 21 (Base Construction Allocation - 22 $100,000) 23 (Land Allocation - $1,000) 24 (Design and Contingencies - $5,000) 25 (3) Fairfield Township, T-321 Bridge No.2 26 over Branch of French Creek, Bridge 27 Replacement 106,000 28 (Base Construction Allocation - 29 $100,000) 30 (Land Allocation - $1,000) 19970S0186B0179 - 139 -
1 (Design and Contingencies - $5,000) 2 (4) Spring Township, T-747 over Branch of 3 Conneaut Creek, Bridge Replacement 126,000 4 (Base Construction Allocation - 5 $120,000) 6 (Land Allocation - $1,000) 7 (Design and Contingencies - $5,000) 8 (5) Wayne Township, T-347 over Branch of 9 Powdermill Run, Bridge Replacement 106,000 10 (Base Construction Allocation - 11 $100,000) 12 (Land Allocation - $1,000) 13 (Design and Contingencies - $5,000) 14 (6) Wayne Township, T-457 over Tributary 15 of Lake Creek, Bridge Replacement 106,000 16 (Base Construction Allocation - 17 $100,000) 18 (Land Allocation - $1,000) 19 (Design and Contingencies - $5,000) 20 (b) State Bridges 21 (1) SR 0006, SR 0006 over Padan Creek, 22 Conneaut Township, Bridge Replacement 1,004,000 23 (Base Construction Allocation - 24 $784,000) 25 (Land Allocation - $20,000) 26 (Design and Contingencies - $200,000) 27 (2) SR 0006, SR 0006 over French Creek, 28 Woodcock Township, Bridge Replacement 2,325,000 29 (Base Construction Allocation - 30 $1,840,000) 19970S0186B0179 - 140 -
1 (Land Allocation - $20,000) 2 (Design and Contingencies - $465,000) 3 (3) SR 0079, SR 0079 under Maple Drive, 4 Hayfield Township, Bridge Replacement 2,401,000 5 (Base Construction Allocation - 6 $1,901,000) 7 (Land Allocation - $20,000) 8 (Design and Contingencies - $480,000) 9 (4) SR 0089, SR 0089 over Shirley Run, 10 Rome Township, Bridge Replacement 510,000 11 (Base Construction Allocation - 12 $420,000) 13 (Land Allocation - $20,000) 14 (Design and Contingencies - $70,000) 15 (5) SR 0098, SR 0098 over Van Horne Run, 16 Vernon Township, Bridge Replacement 320,000 17 (Base Construction Allocation - 18 $260,000) 19 (Land Allocation - $10,000) 20 (Design and Contingencies - $50,000) 21 (6) SR 0099, SR 0099 over Little 22 Conneauttee Creek, Cambridge Township, 23 Bridge Replacement 950,000 24 (Base Construction Allocation - 25 $700,000) 26 (Land Allocation - $50,000) 27 (Design and Contingencies - $200,000) 28 (7) SR 0099, SR 0099 over Conneaut Creek, 29 Cambridge Township, Bridge Replacement 600,000 30 (Base Construction Allocation - 19970S0186B0179 - 141 -
1 $500,000) 2 (Land Allocation - $30,000) 3 (Design and Contingencies - $70,000) 4 (8) SR 0198, SR 0198 over Carr Run, 5 Woodcock Township, Bridge Replacement 260,000 6 (Base Construction Allocation - 7 $200,000) 8 (Land Allocation - $20,000) 9 (Design and Contingencies - $40,000) 10 (9) SR 0285, SR 0285 over Bennett Run, 11 North Shenango Township, Bridge 12 Replacement 750,000 13 (Base Construction Allocation - 14 $650,000) 15 (Land Allocation - $20,000) 16 (Design and Contingencies - $80,000) 17 (10) SR 1002, SR 1002 over Acker Run, 18 Venango Township, Bridge Replacement 370,000 19 (Base Construction Allocation - 20 $300,000) 21 (Land Allocation - $20,000) 22 (Design and Contingencies - $50,000) 23 (11) SR 1024, SR 1024 over Britton Run, 24 Sparta Township, Bridge Replacement 340,000 25 (Base Construction Allocation - 26 $250,000) 27 (Land Allocation - $20,000) 28 (Design and Contingencies - $70,000) 29 (12) SR 2005, SR 2005 over French Creek, 30 East Fairfield Township, Bridge 19970S0186B0179 - 142 -
1 Replacement 1,300,000 2 (Base Construction Allocation - 3 $1,130,000) 4 (Land Allocation - $20,000) 5 (Design and Contingencies - $150,000) 6 (13) SR 2010, SR 2010 over Little Sugar 7 Creek, Wayne Township, Bridge 8 Replacement 260,000 9 (Base Construction Allocation - 10 $200,000) 11 (Land Allocation - $20,000) 12 (Design and Contingencies - $40,000) 13 (14) SR 3016, SR 3016 over B&LE Railroad, 14 Summit Township, Bridge Replacement 1,150,000 15 (Base Construction Allocation - 16 $1,000,000) 17 (Land Allocation - $30,000) 18 (Design and Contingencies - $120,000) 19 (15) SR 0018, SR 0018 Bridge over 20 Tributary of Conneaut Creek, Summit 21 Township, Bridge Rehabilitation 115,000 22 (Base Construction Allocation - 23 $100,000) 24 (Design and Contingencies - $15,000) 25 (16) SR 0098, SR 0098 Bridge over 26 Tributary of Cussewago Creek, Hayfield 27 Township, Bridge Rehabilitation 110,000 28 (Base Construction Allocation - 29 $100,000) 30 (Design and Contingencies - $10,000) 19970S0186B0179 - 143 -
1 Section 25. (Reserved). 2 Section 26. Dauphin County. 3 (a) Local Bridges 4 (1) City of Harrisburg, Mulberry Street 5 Ramp to Cameron Street, Bridge 6 Rehabilitation 108,000 7 (Base Construction Allocation - 8 $73,000) 9 (Land Allocation - $10,000) 10 (Design and Contingencies - $ 25,000) 11 (2) City of Harrisburg, Maclay Street 12 Bridge over Railroad, Bridge 13 Rehabilitation 218,000 14 (Base Construction Allocation - 15 $183,000) 16 (Land Allocation - $10,000) 17 (Design and Contingencies - $25,000) 18 (3) Mifflin Township, T-631, Reitz Road 19 Bridge over Little Wiconisco Creek, 20 County Bridge No.24, Bridge 21 Replacement 290,000 22 (Base Construction Allocation - 23 $200,000) 24 (Land Allocation - $10,000) 25 (Design and Contingencies - $80,000) 26 (4) Mifflin Township, T-556, Kessler Road 27 Bridge over Little Wiconisco Creek, 28 Bridge Replacement 235,000 29 (Base Construction Allocation - 30 $150,000) 19970S0186B0179 - 144 -
1 (Land Allocation - $10,000) 2 (Design and Contingencies - $75,000) 3 (5) Washington Township, Bolts Road Bridge 4 over Wiconisco Creek, Bridge 5 Rehabilitation 469,000 6 (Base Construction Allocation - 7 $374,000) 8 (Land Allocation - $10,000) 9 (Design and Contingencies - $85,000) 10 (6) Wayne Township, T-496, Lebo Road 11 Bridge over Powell Creek, Bridge 12 Rehabilitation 263,000 13 (Base Construction Allocation - 14 $168,000) 15 (Land Allocation - $10,000) 16 (Design and Contingencies - $85,000) 17 (7) Conewago Township, T-602 and T-749 18 over Conewago Creek, Bridge 19 Replacement 722,000 20 (Base Construction Allocation - 21 $556,000) 22 (Land Allocation - $10,000) 23 (Design and Contingencies - $156,000) 24 (8) Halifax Township, T-454 over Armstrong 25 Creek, Bridge Replacement 480,000 26 (Base Construction Allocation - 27 $367,000) 28 (Land Allocation - $10,000) 29 (Design and Contingencies - $103,000) 30 (9) Jackson Township, T-544 over Armstrong 19970S0186B0179 - 145 -
1 Creek, Bridge Replacement 379,000 2 (Base Construction Allocation - 3 $288,000) 4 (Land Allocation - $10,000) 5 (Design and Contingencies - $81,000) 6 (10) Jefferson Township, T-534 over Powell 7 Creek, Bridge Replacement 397,000 8 (Base Construction Allocation - 9 $302,000) 10 (Land Allocation - $10,000) 11 (Design and Contingencies - $85,000) 12 (11) Upper Paxton Township, T-460 over 13 Wiconisco Creek, Bridge Replacement 427,000 14 (Base Construction Allocation - 15 $326,000) 16 (Land Allocation - $10,000) 17 (Design and Contingencies - $91,000) 18 (12) Washington Township, T-595 over 19 Wiconisco Creek, Bridge Replacement 669,000 20 (Base Construction Allocation - 21 $515,000) 22 (Land Allocation - $10,000) 23 (Design and Contingencies - $144,000) 24 (13) Washington Township, T-462 over 25 Wiconisco Creek, Bridge Replacement 668,000 26 (Base Construction Allocation - 27 $514,000) 28 (Land Allocation - $10,000) 29 (Design and Contingencies - $144,000) 30 (14) Wayne Township, T-448 over Powell 19970S0186B0179 - 146 -
1 Creek, Bridge Replacement 438,000 2 (Base Construction Allocation - 3 $334,000) 4 (Land Allocation (Design and 5 Contingencies - $94,000) 6 (b) State Bridges (Reserved) 7 Section 27. Delaware County. 8 (a) Local Bridges 9 (1) City of Chester, West 7th Street, 10 County Bridge No.186 over Chester 11 Creek, Bridge Replacement 1,630,000 12 (Base Construction Allocation - 13 $1,470,000) 14 (Land Allocation - $10,000) 15 (Design and Contingencies - $150,000) 16 (b) State Bridges 17 (1) SR 0030, Pedestrian Tunnel under SR 18 0030 and Ithan Avenue at Villanova 19 University, Radnor Township, Pedestrian 20 Facilities 7,360,000 21 (Base Construction Allocation - 22 $6,500,000) 23 (Land Allocation - $650,000) 24 (Design and Contingencies - $210,000) 25 (2) SR 1015, Darby-Paoli Road Bridge over 26 Branch of Little Darby Creek, Radnor 27 Township, Bridge Replacement 1,000,000 28 (Base Construction Allocation - 29 $760,000) 30 (Land Allocation - $40,000) 19970S0186B0179 - 147 -
1 (Design and Contingencies - $200,000) 2 (3) SR 0291, 4th Street Bridge over Ridley 3 Creek, Chester Township, Bridge 4 Painting 291,000 5 (Base Construction Allocation - 6 $253,000) 7 (Design and Contingencies - $38,000) 8 (4) SR 0291, Essington Avenue Bridge over 9 Darby Creek, Ridley Township, Bridge 10 Painting 546,000 11 (Base Construction Allocation - 12 $487,000) 13 (Design and Contingencies - $59,000) 14 (5) SR 1019, Conestoga Road Bridge over 15 PennDOT Railroad Right-of-Way, Radnor 16 Township, Bridge Removal 125,000 17 (Base Construction Allocation - 18 $100,000) 19 (Land Allocation - $10,000) 20 (Design and Contingencies - $15,000) 21 (6) SR 3019, Rosevally Road Bridge over 22 SEPTA, Upper Providence Township, 23 Bridge Replacement 875,000 24 (Base Construction Allocation - 25 $700,000) 26 (Land Allocation - $100,000) 27 (Design and Contingencies - $75,000) 28 Section 28. Elk County. 29 (a) Local Bridges 30 (1) Village of Wilcox, T-631, Bridge over 19970S0186B0179 - 148 -
1 Clarion River, Bridge Replacement 1,100,000 2 (Base Construction Allocation - 3 $850,000) 4 (Land Allocation - $50,000) 5 (Design and Contingencies - $200,000) 6 (b) State Bridges (Reserved) 7 Section 29. Erie County. 8 (a) Local Bridges 9 (1) Girard Township, Beckman Bridge over 10 I-90, Bridge Painting 200,000 11 (Base Construction Allocation - 12 $200,000) 13 (2) Millcreek Township, T-707, Zimmerly 14 Road Bridge over I-79, New 2-Lane 15 Bridge Construction, New Bridge 2,150,000 16 (Base Construction Allocation - 17 $1,900,000) 18 (Land Allocation - $50,000) 19 (Design and Contingencies - $200,000) 20 (3) City of Erie, Norman Way, Bridge over 21 Millcreek, Bridge Rehabilitation 225,000 22 (Base Construction Allocation - 23 $200,000) 24 (Design and Contingencies - $25,000) 25 (4) City of Erie, McBride Viaduct-East 26 Avenue, Bridge over Railroad Lines, 27 Bridge Rehabilitation 1,340,000 28 (Base Construction Allocation - 29 $1,300,000) 30 (Design and Contingencies - $40,000) 19970S0186B0179 - 149 -
1 (5) City of Erie, Kahkwa Bridge over 2 Ravine Drive, Bridge Rehabilitation 60,000 3 (Base Construction Allocation - 4 $50,000) 5 (Design and Contingencies - $10,000) 6 (6) Greenfield Township, T-974, Old Route 7 89 Bridge over West Branch of French 8 Creek Tributary, Bridge Replacement 350,000 9 (Base Construction Allocation - 10 $300,000) 11 (Land Allocation - $10,000) 12 (Design and Contingencies - $40,000) 13 (7) Franklin Township, T-479, Bridge No.1 14 over Falk Run, Bridge Replacement 350,000 15 (Base Construction Allocation - 16 $300,000) 17 (Land Allocation - $10,000) 18 (Design and Contingencies - $40,000) 19 (8) Franklin Township, T-479, Bridge No.2 20 over Falk Run, Bridge Replacement 350,000 21 (Base Construction Allocation - 22 $300,000) 23 (Land Allocation - $10,000) 24 (Design and Contingencies - $40,000) 25 (9) Franklin Township, T-424, Falls Road 26 Bridge over Falk Run, Bridge 27 Replacement 300,000 28 (Base Construction Allocation - 29 $250,000) 30 (Land Allocation - $10,000) 19970S0186B0179 - 150 -
1 (Design and Contingencies - $40,000) 2 (b) State Bridges 3 (1) SR 0005, SR 0005 over Scott Run, 4 Harborcreek Township, Bridge 5 Replacement 140,000 6 (Base Construction Allocation - 7 $100,000) 8 (Land Allocation - $10,000) 9 (Design and Contingencies - $30,000) 10 (2) SR 0006, SR 0006 over French Creek, Le 11 Boeuf Township, Bridge Replacement 700,000 12 (Base Construction Allocation - 13 $600,000) 14 (Land Allocation - $20,000) 15 (Design and Contingencies - $80,000) 16 (3) SR 0019, SR 0019 over LeBoeuf Creek, 17 Waterford Township, Bridge Replacement 950,000 18 (Base Construction Allocation - 19 $840,000) 20 (Land Allocation - $30,000) 21 (Design and Contingencies - $80,000) 22 (4) SR 0020, SR 0020 over I-79, City of 23 Erie, Bridge Replacement 2,000,000 24 (Base Construction Allocation - 25 $1,770,000) 26 (Land Allocation - $30,000) 27 (Design and Contingencies - $200,000) 28 (5) SR 0089, SR 0089 over Sixteen Mile 29 Creek, North East Township, Bridge 30 Replacement 490,000 19970S0186B0179 - 151 -
1 (Base Construction Allocation - 2 $400,000) 3 (Land Allocation - $20,000) 4 (Design and Contingencies - $70,000) 5 (6) SR 0090, SR 0090 over Crooked Creek, 6 Girard Township, Bridge Replacement 1,420,000 7 (Base Construction Allocation - 8 $1,330,000) 9 (Land Allocation - $30,000) 10 (Design and Contingencies - $60,000) 11 (7) SR 0090, SR 0090 under Cherry Street, 12 Summit Township, Bridge Replacement 1,600,000 13 (Base Construction Allocation - 14 $1,410,000) 15 (Land Allocation - $40,000) 16 (Design and Contingencies - $150,000) 17 (8) SR 0090, SR 0090 under Clark Road, 18 Harborcreek Township, Bridge 19 Replacement 2,100,000 20 (Base Construction Allocation - 21 $1,880,000) 22 (Land Allocation - $40,000) 23 (Design and Contingencies - $180,000) 24 (9) SR 0098, SR 0098 over Cussewago Creek, 25 Elk Creek Township, Bridge Replacement 400,000 26 (Base Construction Allocation - 27 $300,000) 28 (Land Allocation - $20,000) 29 (Design and Contingencies - $80,000) 30 (10) SR 0474, SR 0474 over Dean Run, 19970S0186B0179 - 152 -
1 Venango Township, Bridge Replacement 200,000 2 (Base Construction Allocation - 3 $160,000) 4 (Land Allocation - $10,000) 5 (Design and Contingencies - $30,000) 6 (11) SR 1001, SR 1001 over Conrail, 7 Millcreek Township, Bridge Replacement 720,000 8 (Base Construction Allocation - 9 $600,000) 10 (Land Allocation - $20,000) 11 (Design and Contingencies - $100,000) 12 (12) SR 1011, SR 1011 over Alder Brook, 13 Venango Township, Bridge Replacement 470,000 14 (Base Construction Allocation - 15 $400,000) 16 (Land Allocation - $10,000) 17 (Design and Contingencies - $60,000) 18 (13) SR 1013, SR 1013 over I-90, North 19 East Township, Bridge Replacement 1,220,000 20 (Base Construction Allocation - 21 $1,100,000) 22 (Land Allocation - $20,000) 23 (Design and Contingencies - $100,000) 24 (14) SR 3001, SR 3001 over Conneaut Creek, 25 Conneaut Township, Bridge Replacement 1,020,000 26 (Base Construction Allocation - 27 $900,000) 28 (Land Allocation - $20,000) 29 (Design and Contingencies - $100,000) 30 (15) SR 3003, SR 3003 over West Branch 19970S0186B0179 - 153 -
1 Conneaut Creek, Conneaut Township, 2 Bridge Replacement 630,000 3 (Base Construction Allocation - 4 $550,000) 5 (Land Allocation - $20,000) 6 (Design and Contingencies - $60,000) 7 (16) SR 3014, SR 3014 over Trout Run, 8 Waterford Borough, Bridge Replacement 370,000 9 (Base Construction Allocation - 10 $300,000) 11 (Land Allocation - $20,000) 12 (Design and Contingencies - $50,000) 13 (17) SR 4007, SR 4007 over I-90, Fairview 14 Township, Bridge Replacement 1,920,000 15 (Base Construction Allocation - 16 $1,800,000) 17 (Land Allocation - $20,000) 18 (Design and Contingencies - $100,000) 19 Section 30. Fayette County. 20 (a) Local Bridges 21 (1) Brownsville Township, Lynn Run Road 22 Bridge over Redstone Creek, Bridge 23 Replacement 200,000 24 (Base Construction Allocation - 25 $130,000) 26 (Land Allocation - $10,000) 27 (Design and Contingencies - $60,000) 28 (2) Dunbar Township, Falls Avenue Bridge 29 over Possum Run, Bridge Replacement 450,000 30 (Base Construction Allocation - 19970S0186B0179 - 154 -
1 $350,000) 2 (Land Allocation - $15,000) 3 (Design and Contingencies - $85,000) 4 (3) Georges Township, County Bridge No.162 5 over Mountain Creek, Bridge 6 Replacement 370,000 7 (Base Construction Allocation - 8 $300,000) 9 (Land Allocation - $5,000) 10 (Design and Contingencies - $65,000) 11 (4) German Township, Footedale Bridge 12 No.66 over Dunlap Creek, Bridge 13 Replacement 415,000 14 (Base Construction Allocation - 15 $330,000) 16 (Land Allocation - $10,000) 17 (Design and Contingencies - $75,000) 18 (5) German Township, County Bridge No.54 19 over Browns Run, Bridge Replacement 430,000 20 (Base Construction Allocation - 21 $355,000) 22 (Land Allocation - $5,000) 23 (Design and Contingencies - $70,000) 24 (6) German Township, Leckrone Bridge No.54 25 over Browns Run, Bridge Replacement 430,000 26 (Base Construction Allocation - 27 $350,000) 28 (Land Allocation - $5,000) 29 (Design and Contingencies - $75,000) 30 (7) Menallen Township, T-509, Bridge over 19970S0186B0179 - 155 -
1 Branch of Dunlap Creek, Bridge 2 Replacement 165,000 3 (Base Construction Allocation - 4 $110,000) 5 (Land Allocation - $5,000) 6 (Design and Contingencies - $50,000) 7 (8) Menallen Township, Fan Hallow Road 8 Bridge over Fans Run, Bridge 9 Replacement 145,000 10 (Base Construction Allocation - 11 $90,000) 12 (Land Allocation - $5,000) 13 (Design and Contingencies - $50,000) 14 (9) Menallen and North Union Townships, 15 Fan Hollow Bridge No.184 over Jennings 16 Run, Bridge Replacement 440,000 17 (Base Construction Allocation - 18 $350,000) 19 (Land Allocation - $10,000) 20 (Design and Contingencies - $80,000) 21 (10) Nicholson Township, County Bridge 22 No.29 over York Run, Bridge 23 Replacement 360,000 24 (Base Construction Allocation - 25 $295,000) 26 (Land Allocation - $5,000) 27 (Design and Contingencies - $60,000) 28 (11) Redstone Township, Merrittstown 29 Bridge No.147 over Dunlap Creek, Bridge 30 Replacement 435,000 19970S0186B0179 - 156 -
1 (Base Construction Allocation - 2 $350,000) 3 (Land Allocation - $10,000) 4 (Design and Contingencies - $75,000) 5 (12) South Union Township, Leith Bridge 6 No.41 over Redstone Creek, Bridge 7 Replacement 450,000 8 (Base Construction Allocation - 9 $360,000) 10 (Land Allocation - $10,000) 11 (Design and Contingencies - $80,000) 12 (13) Steward Township, Meadow Run Bridge 13 No.82 over Meadow Run, Bridge 14 Replacement 450,000 15 (Base Construction Allocation - 16 $360,000) 17 (Land Allocation - $10,000) 18 (Design and Contingencies - $80,000) 19 (14) Springhill Township, T-335, County 20 Bridge No.92 over York Run, Bridge 21 Replacement 1,438,000 22 (Base Construction Allocation - 23 $1,113,000) 24 (Land Allocation - $75,000) 25 (Design and Contingencies - $250,000) 26 (15) Springfield Township, T-593, County 27 Bridge No.111 over Mill Run, Bridge 28 Replacement 320,000 29 (Base Construction Allocation - 30 $225,000) 19970S0186B0179 - 157 -
1 (Land Allocation - $20,000) 2 (Design and Contingencies - $75,000) 3 (16) North Union Township, T-535 over 4 Redstone Creek, Bridge Replacement 825,000 5 (Base Construction Allocation - 6 $625,000) 7 (Land Allocation - $25,000) 8 (Design and Contingencies - $175,000) 9 (17) North Union Township, T-557 over 10 Redstone Creek, Bridge Replacement 450,000 11 (Base Construction Allocation - 12 $275,000) 13 (Land Allocation - $50,000) 14 (Design and Contingencies - $125,000) 15 (b) State Bridges 16 (1) SR 0021, Masontown Bridge over 17 Monongahela River, Railroad and Private 18 Road, German Township, Bridge Painting 1,500,000 19 (Base Construction Allocation - 20 $1,500,000) 21 (2) SR 0031, Jacobs Creek Bridge over 22 Branch of Jacobs Creek, Bullskin 23 Township, Bridge Replacement 290,000 24 (Base Construction Allocation - 25 $180,000) 26 (Land Allocation - $35,000) 27 (Design and Contingencies - $75,000) 28 (3) SR 0119, Memorial Bridge over 29 Youghiogheny River, Connellsville 30 Borough, Bridge Painting 100,000 19970S0186B0179 - 158 -
1 (Base Construction Allocation - 2 $100,000) 3 (4) SR 0201, Furnace Run Bridge over 4 Furnace Run, Franklin Township, Bridge 5 Replacement 445,000 6 (Base Construction Allocation - 7 $245,000) 8 (Land Allocation - $25,000) 9 (Design and Contingencies - $175,000) 10 (5) SR 0711, Crawford Avenue Bridge over 11 Youghiogheny River, Connellsville 12 Borough, Bridge Painting 100,000 13 (Base Construction Allocation - 14 $100,000) 15 (6) SR 0982, Jacobs Creek Bridge over 16 Branch of Jacobs Creek, Bullskin 17 Township, Bridge Replacement 335,000 18 (Base Construction Allocation - 19 $225,000) 20 (Land Allocation - $35,000) 21 (Design and Contingencies - $75,000) 22 (7) SR 0982, Bridge over Mounts Creek, 23 Bullskin Township, Bridge Painting 105,000 24 (Base Construction Allocation - 25 $105,000) 26 (8) SR 1051, Mounts Creek Bridge over 27 Mounts Creek, Bullskin Township, Bridge 28 Replacement 436,000 29 (Base Construction Allocation - 30 $236,000) 19970S0186B0179 - 159 -
1 (Land Allocation - $25,000) 2 (Design and Contingencies - $175,000) 3 (9) SR 3013, Browns Run Bridge over Browns 4 Run, German Township, Bridge 5 Replacement 631,000 6 (Base Construction Allocation - 7 $431,000) 8 (Land Allocation - $25,000) 9 (Design and Contingencies - $175,000) 10 (10) SR 3015, Muddy Run Bridge over Muddy 11 Run, Georges Township, Bridge Painting 33,000 12 (Base Construction Allocation - 13 $33,000) 14 (11) SR 4038, Washington Run Bridge over 15 Washington Run, Perry Township, Bridge 16 Replacement 640,000 17 (Base Construction Allocation - 18 $440,000) 19 (Land Allocation - $25,000) 20 (Design and Contingencies - $175,000) 21 (12) SR 0381, SR 0381 over Stoney Run, 22 Wharton Township, Bridge Replacement 663,000 23 (Base Construction Allocation - 24 $463,000) 25 (Land Allocation - $50,000) 26 (Design and Contingencies - $150,000) 27 (13) SR 0819, SR 0819 over Branch of 28 Jacobs Creek, Lower Tyrone Township, 29 Bridge Replacement 240,000 30 (Base Construction Allocation - 19970S0186B0179 - 160 -
1 $125,000) 2 (Land Allocation - $15,000) 3 (Design and Contingencies - $100,000) 4 (14) SR 1021, SR 1021 over Breakneck Run, 5 Bullskin Township, Bridge Replacement 650,000 6 (Base Construction Allocation - 7 $475,000) 8 (Land Allocation - $50,000) 9 (Design and Contingencies - $125,000) 10 (15) SR 1031, SR 1031 over Galley Run, 11 Upper Tyrone Township, Bridge 12 Replacement 475,000 13 (Base Construction Allocation - 14 $325,000) 15 (Land Allocation - $25,000) 16 (Design and Contingencies - $125,000) 17 (16) SR 1031, SR 1031 over Branch of 18 Galley Run, Upper Tyrone Township, 19 Bridge Replacement 613,000 20 (Base Construction Allocation - 21 $413,000) 22 (Land Allocation - $50,000) 23 (Design and Contingencies - $150,000) 24 (17) SR 1044, SR 1044 over Branch of 25 Mounts Creek, Bullskin Township, Bridge 26 Replacement 350,000 27 (Base Construction Allocation - 28 $200,000) 29 (Land Allocation - $25,000) 30 (Design and Contingencies - $125,000) 19970S0186B0179 - 161 -
1 (18) SR 2003, SR 2003 over Chaney Run, 2 Wharton Township, Bridge Replacement 290,000 3 (Base Construction Allocation - 4 $175,000) 5 (Land Allocation - $15,000) 6 (Design and Contingencies - $100,000) 7 (19) SR 3003, SR 3003 at Nicholson 8 Township Border, Springhill Township, 9 Bridge Replacement 1,400,000 10 (Base Construction Allocation - 11 $1,125,000) 12 (Land Allocation - $75,000) 13 (Design and Contingencies - $200,000) 14 (20) SR 3003, SR 3003 over Georges Creek, 15 Springhill Township, Bridge 16 Replacement 1,450,000 17 (Base Construction Allocation - 18 $1,150,000) 19 (Land Allocation - $75,000) 20 (Design and Contingencies - $225,000) 21 (21) SR 3003, SR 3003 Nicholson Township 22 over Georges Creek, Springhill 23 Township, Bridge Replacement 1,200,000 24 (Base Construction Allocation - 25 $975,000) 26 (Land Allocation - $50,000) 27 (Design and Contingencies - $175,000) 28 (22) SR 3009, SR 3009 over Georges Creek, 29 Springhill Township, Bridge 30 Replacement 863,000 19970S0186B0179 - 162 -
1 (Base Construction Allocation - 2 $688,000) 3 (Land Allocation - $25,000) 4 (Design and Contingencies - $150,000) 5 (23) SR 3013, SR 3013 over Middle Run, 6 German Township, Bridge Replacement 900,000 7 (Base Construction Allocation - 8 $650,000) 9 (Land Allocation - $75,000) 10 (Design and Contingencies - $175,000) 11 (24) SR 4027, SR 4027 over Little Redstone 12 Creek, Jefferson Township, Bridge 13 Replacement 538,000 14 (Base Construction Allocation - 15 $338,000) 16 (Land Allocation - $50,000) 17 (Design and Contingencies - $150,000) 18 (25) SR 4044, SR 4044 over Downers Run, 19 Washington Township, Bridge 20 Replacement 800,000 21 (Base Construction Allocation - 22 $575,000) 23 (Land Allocation - $50,000) 24 (Design and Contingencies - $175,000) 25 (26) SR 4046, SR 4046 over Lutz Run and 26 Abandoned Railroad, Washington 27 Township, Bridge Replacement 1,400,000 28 (Base Construction Allocation - 29 $1,075,000) 30 (Land Allocation - $75,000) 19970S0186B0179 - 163 -
1 (Design and Contingencies - $250,000) 2 Section 31. Forrest County. 3 (a) Local Bridges (Reserved) 4 (b) State Bridges 5 (1) SR 0227, SR 0227 over West Hickory 6 Creek, Harmony Township, Bridge 7 Replacement 480,000 8 (Base Construction Allocation - 9 $400,000) 10 (Land Allocation - $20,000) 11 (Design and Contingencies - $60,000) 12 (2) SR 3001, SR 3001 over Little Tionesta 13 Creek, Tionesta Township, Bridge 14 Replacement 400,000 15 (Base Construction Allocation - 16 $310,000) 17 (Land Allocation - $10,000) 18 (Design and Contingencies - $80,000) 19 (3) SR 3004, SR 3004 over Little Hickory 20 Creek, Hickory Township, Bridge 21 Replacement 390,000 22 (Base Construction Allocation - 23 $300,000) 24 (Land Allocation - $30,000) 25 (Design and Contingencies - $60,000) 26 (4) SR 3004, SR 3004 over Piney Run, Green 27 Township, Bridge Replacement 390,000 28 (Base Construction Allocation - 29 $300,000) 30 (Land Allocation - $10,000) 19970S0186B0179 - 164 -
1 (Design and Contingencies - $80,000) 2 Section 32. Franklin County. 3 (a) Local Bridges (Reserved) 4 (b) State Bridges 5 (1) SR 3012, Social Island Road Bridge 6 over Conococheague Creek, Hamilton 7 Township, Bridge Replacement 786,000 8 (Base Construction Allocation - 9 $636,000) 10 (Land Allocation - $95,000) 11 (Design and Contingencies - $55,000) 12 (2) SR 4010, Edenville Road Bridge over 13 Wilson Run, St. Thomas Township, Bridge 14 Replacement 335,000 15 (Base Construction Allocation - 16 $225,000) 17 (Land Allocation - $10,000) 18 (Design and Contingencies - $100,000) 19 (3) SR 4009, over Wilson Run, St. Thomas 20 Township, Bridge Replacement 750,000 21 (Base Construction Allocation - 22 $500,000) 23 (Land Allocation - $50,000) 24 (Design and Contingencies - $200,000) 25 Section 33. (Reserved). 26 Section 34. Greene County. 27 (a) Local Bridges 28 (1) Morgan Township, County Bridge No.89 29 over Browns Run, Bridge Replacement 286,000 30 (Base Construction Allocation - 19970S0186B0179 - 165 -
1 $166,000) 2 (Land Allocation - $20,000) 3 (Design and Contingencies - $100,000) 4 (2) Morgan Township, County Bridge No.90 5 over Browns Run, Bridge Replacement 282,000 6 (Base Construction Allocation - 7 $162,000) 8 (Land Allocation - $20,000) 9 (Design and Contingencies - $100,000) 10 (3) Morgan Township, County Bridge No.91 11 over Browns Run, Bridge Replacement 273,000 12 (Base Construction Allocation - 13 $153,000) 14 (Land Allocation - $20,000) 15 (Design and Contingencies - $100,000) 16 (4) Cumberland Township, T-517, County 17 Bridge No.4, Ullery Road over Goose 18 Run, Bridge Replacement 360,000 19 (Base Construction Allocation - 20 $200,000) 21 (Land Allocation - $10,000) 22 (Design and Contingencies - $150,000) 23 (5) Cumberland Township, T-634, County 24 Bridge No.15, Coal Hill Road over Muddy 25 Creek, Bridge Replacement 410,000 26 (Base Construction Allocation - 27 $240,000) 28 (Land Allocation - $10,000) 29 (Design and Contingencies - $160,000) 30 (6) Greene Township, T-411, County Bridge 19970S0186B0179 - 166 -
1 No.20 over Whitely Creek, Bridge 2 Replacement 490,000 3 (Base Construction Allocation - 4 $300,000) 5 (Land Allocation - $15,000) 6 (Design and Contingencies - $175,000) 7 (7) Gray Township, T-392, County Bridge 8 No.63 over Grays Creek, Bridge 9 Replacement 380,000 10 (Base Construction Allocation - 11 $220,000) 12 (Land Allocation - $10,000) 13 (Design and Contingencies - $150,000) 14 (8) Washington Township, T-550, County 15 Bridge No.97 over Craynes Run, Bridge 16 Replacement 360,000 17 (Base Construction Allocation - 18 $200,000) 19 (Land Allocation - $10,000) 20 (Design and Contingencies - $150,000) 21 (9) Morris Township, T-629, County Bridge 22 No.73 over Bates Fork Creek, Bridge 23 Replacement 490,000 24 (Base Construction Allocation - 25 $350,000) 26 (Land Allocation - $15,000) 27 (Design and Contingencies - $125,000) 28 (10) Cumberland Township, T-660, County 29 Bridge No.13 over Muddy Creek, Bridge 30 Replacement 565,000 19970S0186B0179 - 167 -
1 (Base Construction Allocation - 2 $400,000) 3 (Land Allocation - 15,000) 4 (Design and Contingencies - $150,000) 5 (11) Aleppo Township, T-304, County Bridge 6 No.108 over Branch of Harts Run, Bridge 7 Replacement 575,000 8 (Base Construction Allocation - 9 $425,000) 10 (Land Allocation - $25,000) 11 (Design and Contingencies - $125,000) 12 (b) State Bridges 13 (1) SR 0018, Bridge over South Fork of Ten 14 Mile Creek, Franklin Township, Bridge 15 Rehabilitation 320,000 16 (Base Construction Allocation - 17 $280,000) 18 (Design and Contingencies - $40,000) 19 (2) SR 0018, Bates Creek Bridge over Bates 20 Fork and Browns Creeks, Washington 21 Township, Bridge Replacement 650,000 22 (Base Construction Allocation - 23 $450,000) 24 (Land Allocation - $25,000) 25 (Design and Contingencies - $175,000) 26 (3) SR 0021, Grinnage Run Bridge over 27 Grinnage Run, Gray Township, Bridge 28 Replacement 453,000 29 (Base Construction Allocation - 30 $253,000) 19970S0186B0179 - 168 -
1 (Land Allocation - $25,000) 2 (Design and Contingencies - $175,000) 3 (4) SR 0079, I-79 Bridge over T-631, 4 Washington Township, Bridge 5 Replacement 980,000 6 (Base Construction Allocation - 7 $740,000) 8 (Land Allocation - $40,000) 9 (Design and Contingencies - $200,000) 10 (5) SR 0079, I-79 Bridge over T-631, 11 Washington Township, Bridge 12 Rehabilitation 945,000 13 (Base Construction Allocation - 14 $705,000) 15 (Land Allocation - $40,000) 16 (Design and Contingencies - $200,000) 17 (6) SR 0079, I-79 Bridge over PA 221, 18 Washington Township, Bridge 19 Replacement 2,074,000 20 (Base Construction Allocation - 21 $1,784,000) 22 (Land Allocation - $40,000) 23 (Design and Contingencies - $250,000) 24 (7) SR 0079, I-79 Bridge No.2 over PA 221, 25 Washington Township, Bridge 26 Replacement 2,074,000 27 (Base Construction Allocation - 28 $1,784,000) 29 (Land Allocation - $40,000) 30 (Design and Contingencies - $250,000) 19970S0186B0179 - 169 -
1 (8) SR 0079, I-79 Bridge over T-512, 2 Washington Township, Bridge 3 Rehabilitation 980,000 4 (Base Construction Allocation - 5 $740,000) 6 (Land Allocation - $40,000) 7 (Design and Contingencies - $200,000) 8 (9) SR 0079, I-79 Bridge No.2 over T-512, 9 Washington Township, Bridge 10 Replacement 1,020,000 11 (Base Construction Allocation - 12 $780,000) 13 (Land Allocation - $40,000) 14 (Design and Contingencies - $200,000) 15 (10) SR 0088, Albert Gallatin Bridge over 16 Monongahela River, Dunkard Township, 17 Bridge Painting 1,500,000 18 (Base Construction Allocation - 19 $1,500,000) 20 (11) SR 0088, Point Marion Bridge over 21 Monongahela River, Dunkard Township, 22 Bridge Replacement 6,200,000 23 (Base Construction Allocation - 24 $5,500,000) 25 (Land Allocation - $200,000) 26 (Design and Contingencies - $500,000) 27 (12) SR 0218, Roberts Run Bridge No.2 over 28 Roberts Run, Wayne Township, Bridge 29 Replacement 768,000 30 (Base Construction Allocation - 19970S0186B0179 - 170 -
1 $568,000) 2 (Land Allocation - $25,000) 3 (Design and Contingencies - $175,000) 4 (13) SR 2003, Bridge over Branch of 5 Dunkard Creek, Perry Township, Bridge 6 Replacement 625,000 7 (Base Construction Allocation - 8 $400,000) 9 (Land Allocation - $25,000) 10 (Design and Contingencies - $200,000) 11 (14) SR 3007, Bridge over Branch of 12 Wheeling Creek, Richill Township, 13 Bridge Replacement 375,000 14 (Base Construction Allocation - 15 $175,000) 16 (Land Allocation - $25,000) 17 (Design and Contingencies - $175,000) 18 Section 35. Huntingdon County. 19 (a) Local Bridges 20 (1) Mill Creek Borough, Main Street Bridge 21 over Mill Creek, Bridge Rehabilitation 30,000 22 (Base Construction Allocation - 23 $30,000) 24 (2) Juniata Township, T-428, Corbin Bridge 25 over Raystown Branch of Juniata River, 26 Bridge Replacement 920,000 27 (Base Construction Allocation - 28 $920,000) 29 (3) Springfield Township, T-313, Walnut 30 Grove Bridge, County Bridge No.2 over 19970S0186B0179 - 171 -
1 Sideling Hill Creek, Bridge 2 Replacement 975,000 3 (Base Construction Allocation - 4 $800,000) 5 (Land Allocation - $25,000) 6 (Design and Contingencies - $150,000) 7 (b) State Bridges (Reserved) 8 Section 36. Indiana County. 9 (a) Local Bridges 10 (1) Banks Township, T-974, County Bridge 11 No.13, Bear Run Bridge over Bear Run, 12 Bridge Replacement 500,000 13 (Base Construction Allocation - 14 $400,000) 15 (Land Allocation - $20,000) 16 (Design and Contingencies - $80,000) 17 (2) Blacklick Township, T-574, Muddy Run 18 Bridge over Muddy Run, Bridge 19 Replacement 380,000 20 (Base Construction Allocation - 21 $300,000) 22 (Land Allocation - $10,000) 23 (Design and Contingencies - $70,000) 24 (3) Cherryhill Township, T-686, County 25 Bridge No.65, Grace Church Bridge over 26 Two Lick Creek, Bridge Replacement 600,000 27 (Base Construction Allocation - 28 $500,000) 29 (Land Allocation - $20,000) 30 (Design and Contingencies - $80,000) 19970S0186B0179 - 172 -
1 (4) Cherryhill Township, T-978, Allen 2 Bridge over Two Lick Reservoir, Bridge 3 Rehabilitation 264,000 4 (Base Construction Allocation - 5 $200,000) 6 (Land Allocation - $10,000) 7 (Design and Contingencies - $54,000) 8 (5) Rayne Township, T-760, County Bridge 9 No.23-A, Chambersville Bridge over 10 Crooked Creek, Bridge Rehabilitation 190,000 11 (Base Construction Allocation - 12 $150,000) 13 (Land Allocation - $10,000) 14 (Design and Contingencies - $30,000) 15 (6) Grant Township, T-820 over Crooked 16 Run, Bridge Replacement 245,000 17 (Base Construction Allocation - 18 $200,000) 19 (Land Allocation - $10,000) 20 (Design and Contingencies - $35,000) 21 (b) State Bridges 22 (1) SR 0022, Chestnut Ridge Bridge over SR 23 0119, Burrell Township, Bridge 24 Painting 90,000 25 (Base Construction Allocation - 26 $75,000) 27 (Design and Contingencies - $15,000) 28 (2) SR 0022, Armagh Bridge over SR 0056, 29 West Wheatfield Township, Bridge 30 Painting 145,000 19970S0186B0179 - 173 -
1 (Base Construction Allocation - 2 $130,000) 3 (Design and Contingencies - $15,000) 4 (3) SR 0119, Blacklick Bridge over 5 Blacklick Creek, Burrell Township, 6 Bridge Painting 280,000 7 (Base Construction Allocation - 8 $265,000) 9 (Design and Contingencies - $15,000) 10 (4) SR 0119, Bypass Steel Bridge No.1 over 11 Wayne Avenue Ramps, White Township, 12 Bridge Painting 170,000 13 (Base Construction Allocation - 14 $155,000) 15 (Design and Contingencies - $15,000) 16 (5) SR 0119, Bypass Steel Bridge No.2 over 17 Wayne Avenue Ramps, White Township, 18 Bridge Painting 170,000 19 (Base Construction Allocation - 20 $155,000) 21 (Design and Contingencies - $15,000) 22 (6) SR 0119, Bypass Steel Bridge No.3 over 23 SR 0422, White Township, Bridge 24 Painting 240,000 25 (Base Construction Allocation - 26 $225,000) 27 (Design and Contingencies - $15,000) 28 (7) SR 0119, Bypass Steel Bridge No.4 over 29 SR 0422, White Township, Bridge 30 Painting 240,000 19970S0186B0179 - 174 -
1 (Base Construction Allocation - 2 $225,000) 3 (Design and Contingencies - $15,000) 4 (8) SR 0119, Bypass Steel Bridge No.5 over 5 SR 0954, White Township, Bridge 6 Painting 195,000 7 (Base Construction Allocation - 8 $180,000) 9 (Design and Contingencies - $15,000) 10 (9) SR 0119, Bypass Steel Bridge No.6 over 11 SR 0954, White Township, Bridge 12 Painting 175,000 13 (Base Construction Allocation - 14 $160,000) 15 (Design and Contingencies - $15,000) 16 (10) SR 0119, Bypass Steel Bridge No.7 17 over SR 0286, White Township, Bridge 18 Painting 235,000 19 (Base Construction Allocation - 20 $220,000) 21 (Design and Contingencies - $15,000) 22 (11) SR 0119, Bypass Steel Bridge No.8 23 over SR 0286, White Township, Bridge 24 Painting 215,000 25 (Base Construction Allocation - 26 $200,000) 27 (Design and Contingencies - $15,000) 28 (12) SR 0119, Bypass Steel Bridge No.9 29 over SR 1003, White Township, Bridge 30 Painting 200,000 19970S0186B0179 - 175 -
1 (Base Construction Allocation - 2 $185,000) 3 (Design and Contingencies - $15,000) 4 (13) SR 0119, Bypass Steel Bridge No.10 5 over SR 1003, White Township, Bridge 6 Painting 175,000 7 (Base Construction Allocation - 8 $160,000) 9 (Design and Contingencies - $15,000) 10 (14) SR 0119, Bypass Steel Bridge No.11 11 over SR 0110, White Township, Bridge 12 Painting 125,000 13 (Base Construction Allocation - 14 $110,000) 15 (Design and Contingencies - $15,000) 16 (15) SR 0119, Bypass Steel Bridge No.12 17 over SR 0110, White Township, Bridge 18 Painting 125,000 19 (Base Construction Allocation - 20 $110,000) 21 (Design and Contingencies - $15,000) 22 (16) SR 0217, Torrance Bridge over 23 Conemaugh River, Burrell Township, 24 Bridge Painting 435,000 25 (Base Construction Allocation - 26 $420,000) 27 (Design and Contingencies - $15,000) 28 (17) SR 0217, Blacklick Creek Bridge over 29 Blacklick Creek, Burrell Township, 30 Bridge Painting 400,000 19970S0186B0179 - 176 -
1 (Base Construction Allocation - 2 $385,000) 3 (Design and Contingencies - $15,000) 4 (18) SR 0259, Heshbon Bridge over 5 Blacklick Creek, West Wheatfield 6 Township, Bridge Painting 200,000 7 (Base Construction Allocation - 8 $185,000) 9 (Design and Contingencies - $15,000) 10 (19) SR 0286, Clymer Bridge over Twolick 11 Creek, Clymer Borough, Bridge Painting 175,000 12 (Base Construction Allocation - 13 $160,000) 14 (Design and Contingencies - $15,000) 15 (20) SR 0422, Twolick Eastbound Bridge 16 over Twolick Creek, White Township, 17 Bridge Painting 360,000 18 (Base Construction Allocation - 19 $345,000) 20 (Design and Contingencies - $15,000) 21 (21) SR 0422, Twolick Westbound Bridge 22 over Twolick Creek, White Township, 23 Bridge Painting 360,000 24 (Base Construction Allocation - 25 $345,000) 26 (Design and Contingencies - $15,000) 27 (22) SR 0422, Penn Run Exit Bridge 28 Eastbound over TR 840, White Township, 29 Bridge Painting 190,000 30 (Base Construction Allocation - 19970S0186B0179 - 177 -
1 $175,000) 2 (Design and Contingencies - $15,000) 3 (23) SR 0422, Penn Run Exit Bridge 4 Westbound over TR 840, White Township, 5 Bridge Painting 190,000 6 (Base Construction Allocation - 7 $175,000) 8 (Design and Contingencies - $15,000) 9 (24) SR 0580, Cush Cushion Creek Bridge 10 over Cush Cushion Creek, Green 11 Township, Bridge Painting 85,000 12 (Base Construction Allocation - 13 $70,000) 14 (Design and Contingencies - $15,000) 15 (25) SR 0954, Yellow Creek Bridge over 16 Yellow Creek, White Township, Bridge 17 Painting 125,000 18 (Base Construction Allocation - 19 $110,000) 20 (Design and Contingencies - $15,000) 21 (26) SR 0954, Creekside Bridge over 22 Crooked Creek, White Township, Bridge 23 Painting 125,000 24 (Base Construction Allocation - 25 $110,000) 26 (Design and Contingencies - $15,000) 27 (27) SR 0954, South Branch Bridge over 28 South Branch of Plum Creek, Washington 29 Township, Bridge Painting 75,000 30 (Base Construction Allocation - 19970S0186B0179 - 178 -
1 $60,000) 2 (Design and Contingencies - $15,000) 3 (28) SR 1004, Philadelphia Street Exit 4 Bridge over SR 0119, White Township, 5 Bridge Painting 235,000 6 (Base Construction Allocation - 7 $220,000) 8 (Design and Contingencies - $15,000) 9 (29) SR 1006, Jimmy Stewart Airport Bridge 10 over SR 0119, White Township, Bridge 11 Painting 245,000 12 (Base Construction Allocation - 13 $230,000) 14 (Design and Contingencies - $15,000) 15 (30) SR 1007, Tanoma Bridge over Crooked 16 Creek, Rayne Township, Bridge Painting 75,000 17 (Base Construction Allocation - 18 $60,000) 19 (Design and Contingencies - $15,000) 20 (31) SR 1014, Diamondville Bridge over 21 North Branch of Twolick Creek, Green 22 Township, Bridge Painting 75,000 23 (Base Construction Allocation - 24 $60,000) 25 (Design and Contingencies - $15,000) 26 (32) SR 1017, Pine Flats Bridge over South 27 Branch of Twolick Creek, Green 28 Township, Bridge Painting 95,000 29 (Base Construction Allocation - 30 $80,000) 19970S0186B0179 - 179 -
1 (Design and Contingencies - $15,000) 2 (33) SR 1033, Gypsy Bridge over Cush 3 Creek, Montgomery Township, Bridge 4 Painting 85,000 5 (Base Construction Allocation - 6 $70,000) 7 (Design and Contingencies - $15,000) 8 (34) SR 1034, Lower Wilgus Bridge over 9 Branch of Cush Creek, Montgomery 10 Township, Bridge Painting 55,000 11 (Base Construction Allocation - 12 $40,000) 13 (Design and Contingencies - $15,000) 14 (35) SR 1038, Crooked Run Bridge over 15 Crooked Run, East Mahoning Township, 16 Bridge Painting 60,000 17 (Base Construction Allocation - 18 $45,000) 19 (Design and Contingencies - $15,000) 20 (36) SR 1045, Broadhead Run Bridge over 21 Broadhead Run, Canoe Township, Bridge 22 Painting 70,000 23 (Base Construction Allocation - 24 $55,000) 25 (Design and Contingencies - $15,000) 26 (37) SR 1045, Juneau Bridge over Canoe 27 Creek, Canoe Township, Bridge Painting 75,000 28 (Base Construction Allocation - 29 $60,000) 30 (Design and Contingencies - $15,000) 19970S0186B0179 - 180 -
1 (38) SR 1046, Straight Run Bridge over 2 Straight Run, Banks Township, Bridge 3 Painting 80,000 4 (Base Construction Allocation - 5 $65,000) 6 (Design and Contingencies - $15,000) 7 (39) SR 2019, Tearing Run Bridge No.1 over 8 Tearing Run, Center Township, Bridge 9 Painting 55,000 10 (Base Construction Allocation - 11 $40,000) 12 (Design and Contingencies - $15,000) 13 (40) SR 2019, Tearing Run Bridge No.2 over 14 Tearing Run, Center Township, Bridge 15 Painting 65,000 16 (Base Construction Allocation - 17 $50,000) 18 (Design and Contingencies - $15,000) 19 (41) SR 3003, Tunnelton Bridge over 20 Conemaugh River, Conemaugh Township, 21 Bridge Painting 525,000 22 (Base Construction Allocation - 23 $510,000) 24 (Design and Contingencies - $15,000) 25 (42) SR 3007, Clarksburg Bridge over 26 Blacklegs Creek, Conemaugh Township, 27 Bridge Painting 105,000 28 (Base Construction Allocation - 29 $90,000) 30 (Design and Contingencies - $15,000) 19970S0186B0179 - 181 -
1 (43) SR 3011, Blacklick Creek Bridge No.1 2 over Blacklick Creek, Brush Valley 3 Township, Bridge Painting 405,000 4 (Base Construction Allocation - 5 $390,000) 6 (Design and Contingencies - $15,000) 7 (44) SR 3011, Blacklick Creek Bridge No.2 8 over Blacklick Creek, Blacklick 9 Township, Bridge Painting 405,000 10 (Base Construction Allocation - 11 $390,000) 12 (Design and Contingencies - $15,000) 13 (45) SR 3013, Muddy Run Bridge over Muddy 14 Run, Blacklick Township, Bridge 15 Painting 65,000 16 (Base Construction Allocation - 17 $50,000) 18 (Design and Contingencies - $15,000) 19 (46) SR 3016, Homer City Bridge over 20 Twolick Creek, Homer City Borough, 21 Bridge Painting 125,000 22 (Base Construction Allocation - 23 $110,000) 24 (Design and Contingencies - $15,000) 25 (47) SR 3031, Blacklegs Run Bridge over 26 Blacklegs Run, Young Township, Bridge 27 Painting 65,000 28 (Base Construction Allocation - 29 $50,000) 30 (Design and Contingencies - $15,000) 19970S0186B0179 - 182 -
1 (48) SR 3037, Walker Run Bridge over 2 Walker Run, Armstrong Township, Bridge 3 Painting 55,000 4 (Base Construction Allocation - 5 $40,000) 6 (Design and Contingencies - $15,000) 7 (49) SR 3039, Anthony Run Bridge over 8 Anthony Run, Armstrong Township, Bridge 9 Painting 55,000 10 (Base Construction Allocation - 11 $40,000) 12 (Design and Contingencies - $15,000) 13 (50) SR 4001, Fisher Siding Bridge over 14 Crooked Creek, Armstrong Township, 15 Bridge Painting 110,000 16 (Base Construction Allocation - 17 $95,000) 18 (Design and Contingencies - $15,000) 19 (51) SR 4001, Five Points Bridge over 20 South Branch of Plum Creek, Washington 21 Township, Bridge Painting 100,000 22 (Base Construction Allocation - 23 $85,000) 24 (Design and Contingencies - $15,000) 25 (52) SR 4006, Reddings Run Bridge over 26 Reddings Run, Washington Township, 27 Bridge Painting 55,000 28 (Base Construction Allocation - 29 $40,000) 30 (Design and Contingencies - $15,000) 19970S0186B0179 - 183 -
1 (53) SR 4008, Kimmel Station Bridge No.1 2 over Branch of Crooked Creek, Rayne 3 Township, Bridge Painting 50,000 4 (Base Construction Allocation - 5 $35,000) 6 (Design and Contingencies - $15,000) 7 (54) SR 4008, Kimmel Station Bridge No.2 8 over Branch of Crooked Creek, Rayne 9 Township, Bridge Painting 50,000 10 (Base Construction Allocation - 11 $35,000) 12 (Design and Contingencies - $15,000) 13 (55) SR 4035, Plumville Bridge over Plum 14 Creek, Plumville Borough, Bridge 15 Painting 75,000 16 (Base Construction Allocation - 17 $60,000) 18 (Design and Contingencies - $15,000) 19 (56) SR 0056, Seward Conrail Overpass, 20 East Wheatfield Township, Bridge 21 Replacement 2,570,000 22 (Base Construction Allocation - 23 $2,080,000) 24 (Land Allocation - $150,000) 25 (Design and Contingencies - $340,000) 26 Section 37. Jefferson County. 27 (a) Local Bridges 28 (1) Summerville Borough, County Bridge 40- 29 A, Anderson Road Bridge over Runaway 30 Run, Bridge Rehabilitation 415,000 19970S0186B0179 - 184 -
1 (Base Construction Allocation - 2 $345,000) 3 (Land Allocation - $10,000) 4 (Design and Contingencies - $60,000) 5 (2) Sykesville Borough, Station Street 6 Bridge over Stump Creek, Bridge 7 Replacement 570,000 8 (Base Construction Allocation - 9 $500,000) 10 (Land Allocation - $10,000) 11 (Design and Contingencies - $60,000) 12 (3) Eldred Township, T-346 over Mill 13 Creek, Bridge Replacement 420,000 14 (Base Construction Allocation - 15 $330,000) 16 (Land Allocation - $10,000) 17 (Design and Contingencies - $80,000) 18 (4) Eldred Township, T-353 over Mill Run, 19 Bridge Replacement 245,000 20 (Base Construction Allocation - 21 $200,000) 22 (Land Allocation - $10,000) 23 (Design and Contingencies - $35,000) 24 (5) Oliver Township, T-718 over Little 25 Sandy Creek, Bridge Replacement 490,000 26 (Base Construction Allocation - 27 $400,000) 28 (Land Allocation - $10,000) 29 (Design and Contingencies - $80,000) 30 (6) Union Township, T-320 over Little Mill 19970S0186B0179 - 185 -
1 Creek, Bridge Replacement 245,000 2 (Base Construction Allocation - 3 $200,000) 4 (Land Allocation - $10,000) 5 (Design and Contingencies - $35,000) 6 (7) Union Township, T-321 over Runaway 7 Run, Bridge Replacement 145,000 8 (Base Construction Allocation - 9 $100,000) 10 (Land Allocation - $5,000) 11 (Design and Contingencies - $40,000) 12 (8) Young Township, T-632 over Saw Mill 13 Run, Bridge Replacement 310,000 14 (Base Construction Allocation - 15 $250,000) 16 (Land Allocation - $10,000) 17 (Design and Contingencies - $50,000) 18 (b) State Bridges 19 (1) SR 3033, T-830, Knox No.1 Bridge over 20 Swamp Run, Knox Township, Bridge 21 Replacement 446,000 22 (Base Construction Allocation - 23 $376,000) 24 (Land Allocation - $10,000) 25 (Design and Contingencies - $60,000) 26 (2) SR 0036, Sawmill Run Bridge over 27 Sawmill Run, Punxsutawney Borough, 28 Bridge Painting 60,000 29 (Base Construction Allocation - 30 $45,000) 19970S0186B0179 - 186 -
1 (Design and Contingencies - $15,000) 2 (3) SR 0119, Punxsutawney Bridge over 3 Mahoning Creek, Punxsutawney Borough, 4 Bridge Painting 250,000 5 (Base Construction Allocation - 6 $235,000) 7 (Design and Contingencies - $15,000) 8 (4) SR 0410, Beaver Run Bridge over Beaver 9 Run, Henderson Township, Bridge 10 Painting 55,000 11 (Base Construction Allocation - 12 $40,000) 13 (Design and Contingencies - $15,000) 14 (5) SR 0830, Falls Creek Bridge over Falls 15 Creek, Falls Creek Township, Bridge 16 Painting 80,000 17 (Base Construction Allocation - 18 $65,000) 19 (Design and Contingencies - $15,000) 20 (6) SR 0949, Corsica Exit Bridge over I- 21 80, Union Township, Bridge Painting 205,000 22 (Base Construction Allocation - 23 $190,000) 24 (Design and Contingencies - $15,000) 25 (7) SR 1009, Kyle's Run Bridge over Kyle's 26 Run, Washington Township, Bridge 27 Painting 60,000 28 (Base Construction Allocation - 29 $45,000) 30 (Design and Contingencies - $15,000) 19970S0186B0179 - 187 -
1 (8) SR 1027, Egypt Bridge over North Fork 2 Creek, Rock Township, Bridge Painting 125,000 3 (Base Construction Allocation - 4 $110,000) 5 (Design and Contingencies - $15,000) 6 (9) SR 2007, Clover Run Bridge over Clover 7 Run, Gaskill Township, Bridge Painting 95,000 8 (Base Construction Allocation - 9 $80,000) 10 (Design and Contingencies - $15,000) 11 (10) SR 2008, Stump Creek Bridge over 12 Stump Creek, Henderson Township, Bridge 13 Painting 100,000 14 (Base Construction Allocation - 15 $85,000) 16 (Design and Contingencies - $15,000) 17 (11) SR 2023, Anita Bridge over Elk Run, 18 McCalmont Township, Bridge Painting 60,000 19 (Base Construction Allocation - 20 $45,000) 21 (Design and Contingencies - $15,000) 22 (12) SR 2023, Charcoal Plant Bridge over 23 Sandy Lick Creek, Pine Creek Township, 24 Bridge Painting 125,000 25 (Base Construction Allocation - 26 $110,000) 27 (Design and Contingencies - $15,000) 28 (13) SR 3003, Baxter Bridge over Redbank 29 Creek, Clover Township, Bridge 30 Painting 235,000 19970S0186B0179 - 188 -
1 (Base Construction Allocation - 2 $220,000) 3 (Design and Contingencies - $15,000) 4 (14) SR 4006, North Fork Creek Bridge over 5 North Fork Creek, Warsaw Township, 6 Bridge Painting 110,000 7 (Base Construction Allocation - 8 $95,000) 9 (Design and Contingencies - $15,000) 10 (15) SR 0310, Bridge over Branch of Trout 11 Run, Winslow Township, Bridge 12 Replacement 490,000 13 (Base Construction Allocation - 14 $350,000) 15 (Land Allocation - $20,000) 16 (Design and Contingencies - $120,000) 17 (16) SR 3018, Bridge over Little Sandy 18 Creek, Limestone Township, Bridge 19 Replacement 670,000 20 (Base Construction Allocation - 21 $500,000) 22 (Land Allocation - $20,000) 23 (Design and Contingencies - $150,000) 24 Section 38. Juniata County. 25 (a) Local Bridges 26 (1) Fayette Township, T-558 over West 27 Branch of Cocolamus Creek, Bridge 28 Rehabilitation 21,000 29 (Base Construction Allocation - 30 $18,000) 19970S0186B0179 - 189 -
1 (Design and Contingencies - $3,000) 2 (2) Fayette Township, T-602 over Little 3 Lost Creek, Bridge Rehabilitation 19,000 4 (Base Construction Allocation - 5 $17,000) 6 (Design and Contingencies - $2,000) 7 (b) State Bridges 8 (1) SR 0850, Laurel Run Bridge over Laurel 9 Run, Village of Honey Grove, Tuscarora 10 Township, Bridge Replacement 670,000 11 (Base Construction Allocation - 12 $500,000) 13 (Land Allocation - $20,000) 14 (Design and Contingencies - $150,000) 15 (2) SR 0850, Bridge over Tuscarora Creek, 16 Tuscarora Township, Bridge 17 Rehabilitation 155,000 18 (Base Construction Allocation - 19 $150,000) 20 (Design and Contingencies - $5,000) 21 (3) SR 0850, Bridge over Tuscarora Creek, 22 Tuscarora Township, Bridge Replacement 1,420,000 23 (Base Construction Allocation - 24 $1,280,000) 25 (Land Allocation - $40,000) 26 (Design and Contingencies - $100,000) 27 Section 39. Lackawanna County. 28 (a) Local Bridges 29 (1) Mayfield Borough, Poplar Street Bridge 30 No.1 at Junction of South Washington 19970S0186B0179 - 190 -
1 Avenue, Bridge Rehabilitation 150,000 2 (Base Construction Allocation - 3 $130,000) 4 (Design and Contingencies - $20,000) 5 (b) State Bridges 6 (1) SR 1016, Hill Street Bridge over 7 Lackawanna River, Jessup and Blakely 8 Boroughs, Bridge Deck Rehabilitation 890,000 9 (Base Construction Allocation - 10 $800,000) 11 (Land Allocation - $10,000) 12 (Design and Contingencies - $80,000) 13 (2) SR 3011, Keyser Avenue Bridge over 14 Lindy Creek, City of Scranton, Bridge 15 Replacement 185,000 16 (Base Construction Allocation - 17 $100,000) 18 (Land Allocation - $10,000) 19 (Design and Contingencies - $75,000) 20 (3) SR 0171, Bridge over Elk Creek at 21 Junction of SR 1011, Fell Township, 22 Bridge Replacement 660,000 23 (Base Construction Allocation - 24 $520,000) 25 (Land Allocation - $10,000) 26 (Design and Contingencies - $130,000) 27 (4) SR 0247, Bridge over South Branch of 28 Tunkhannock Creek, North of TR 438, 29 Scott Township, Bridge Replacement 426,000 30 (Base Construction Allocation - 19970S0186B0179 - 191 -
1 $330,000) 2 (Land Allocation - $10,000) 3 (Design and Contingencies - $86,000) 4 (5) SR 2003, Bridge over Wallenpaupack 5 Creek, North of TR 348, Jefferson 6 Township, Bridge Replacement 355,000 7 (Base Construction Allocation - 8 $275,000) 9 (Land Allocation - $10,000) 10 (Design and Contingencies - $70,000) 11 (6) SR 3013, Main Street Bridge, Old Forge 12 Borough, Bridge Painting 660,000 13 (Base Construction Allocation - 14 $600,000) 15 (Design and Contingencies - $60,000) 16 (7) State Bridges, Countywide Bridge Zone 17 Painting, Bridge Painting 370,000 18 (Base Construction Allocation - 19 $350,000) 20 (Land Allocation - $10,000) 21 (Design and Contingencies - $10,000) 22 (8) SR 1013, Bridge over Elm Brook, 0.7 23 Mile North of SR 1006, Scott Township, 24 Bridge Replacement 240,000 25 (Base Construction Allocation - 26 $200,000) 27 (Land Allocation - $10,000) 28 (Design and Contingencies - $30,000) 29 Section 40. Lancaster County. 30 (a) Local Bridges 19970S0186B0179 - 192 -
1 (1) Manor Township, T-599, West Roseville 2 Road Bridge over Little Conestoga 3 Creek, Bridge Replacement 375,000 4 (Base Construction Allocation - 5 $286,000) 6 (Land Allocation - $10,000) 7 (Design and Contingencies - $150,000) 8 (2) Mt. Joy Township, T-350, Risser Mill 9 Bridge over Tributary of Little 10 Chickies Creek, Bridge Rehabilitation 550,000 11 (Base Construction Allocation - 12 $400,000) 13 (Design and Contingencies - $150,000) 14 (3) Pequea Township, Silver Mine Road at 15 Burnt Mills, Bridge Replacement 100,000 16 (Base Construction Allocation - 17 $90,000) 18 (Design and Contingencies - $10,000) 19 (b) State Bridges 20 (1) SR 1024, Bridge over Little Cocalico 21 Creek, East Cocalico Township, Bridge 22 Replacement 675,000 23 (Base Construction Allocation - 24 $550,000) 25 (Land Allocation - $25,000) 26 (Design and Contingencies - $100,000) 27 Section 41. Lawrence County. 28 (a) Local Bridges 29 (1) City of New Castle, Willard Avenue 30 Bridge over Tributary of Shenango 19970S0186B0179 - 193 -
1 River, Bridge Replacement 210,000 2 (Base Construction Allocation - 3 $150,000) 4 (Land Allocation - $20,000) 5 (Design and Contingencies - $40,000) 6 (2) Wampum Borough, Main Street Bridge 7 over Eckles Run, Bridge Rehabilitation 190,000 8 (Base Construction Allocation - 9 $150,000) 10 (Design and Contingencies - $40,000) 11 (b) State Bridges 12 (1) SR 0018, Mahoning Avenue Viaduct over 13 Shenango River and Railroad, City of 14 New Castle, Bridge Replacement 9,320,000 15 (Base Construction Allocation - 16 $9,000,000) 17 (Land Allocation - $20,000) 18 (Design and Contingencies - $300,000) 19 (2) SR 0018, Liberty Street Bridge over 20 Hickory Run, New Castle City, Bridge 21 Rehabilitation 450,000 22 (Base Construction Allocation - 23 $300,000) 24 (Land Allocation - $50,000) 25 (Design and Contingencies - $100,000) 26 (3) SR 0060, SR 0060 Southbound over SR 27 4004, Neshannock Township, Bridge 28 Replacement 350,000 29 (Base Construction Allocation - 30 $200,000) 19970S0186B0179 - 194 -
1 (Land Allocation - $50,000) 2 (Design and Contingencies - $100,000) 3 (4) SR 0065, Ellwood Road Bridge over B&O 4 Railroad, Shenango Township, Bridge 5 Replacement 400,000 6 (Base Construction Allocation - 7 $250,000) 8 (Land Allocation - $50,000) 9 (Design and Contingencies - $100,000) 10 (5) SR 0488, Portersville Road Bridge over 11 Morrison Run, Perry Township, Bridge 12 Replacement 250,000 13 (Base Construction Allocation - 14 $100,000) 15 (Land Allocation - $50,000) 16 (Design and Contingencies - $100,000) 17 (6) SR 0488, Portersville Road Bridge over 18 Morrison Run, Perry Township, Bridge 19 Replacement 250,000 20 (Base Construction Allocation - 21 $100,000) 22 (Land Allocation - $50,000) 23 (Design and Contingencies - $100,000) 24 (7) SR 3001, South Main Street Bridge over 25 Bessemer Haul Road, Bessemer Borough, 26 Bridge Rehabilitation 950,000 27 (Base Construction Allocation - 28 $800,000) 29 (Design and Contingencies - $150,000) 30 (8) SR 4004, Union and Neshannock 19970S0186B0179 - 195 -
1 Townships, Bridge Rehabilitation 800,000 2 (Base Construction Allocation - 3 $700,000) 4 (Design and Contingencies - $100,000) 5 (9) SR 0060, Beaver Valley Expansion 6 Bridge over SR 4005, Neshannock 7 Township, Bridge Rehabilitation 650,000 8 (Base Construction Allocation - 9 $500,000) 10 (Design and Contingencies - $150,000) 11 (10) SR 0060, Beaver Valley Extension 12 Bridge over SR 4005, Neshannock 13 Township, Bridge Rehabilitation 127,000 14 (Base Construction Allocation - 15 $116,000) 16 (Design and Contingencies - $11,000) 17 (11) SR 0081, US 224 State Street Bridge 18 over SR 0422 and Ramp K, Union 19 Township, Bridge Rehabilitation 706,000 20 (Base Construction Allocation - 21 $644,000) 22 (Design and Contingencies - $62,000) 23 (12) SR 0422, Westbound Bridge over Beaver 24 River, Railroad and Local Street, 25 Taylor Township, Bridge Rehabilitation 6,841,000 26 (Base Construction Allocation - 27 $6,741,000) 28 (Design and Contingencies - $100,000) 29 (13) SR 0422, Eastbound Bridge over Beaver 30 River, Railroad and Local Street, 19970S0186B0179 - 196 -
1 Taylor Township, Bridge Replacement 6,963,000 2 (Base Construction Allocation - 3 $6,863,000) 4 (Design and Contingencies - $100,000) 5 (14) SR 0422, Bridge over Business US 422, 6 Union Township, Bridge Rehabilitation 1,379,000 7 (Base Construction Allocation - 8 $1,254,000) 9 (Design and Contingencies - $125,000) 10 (15) SR 0422, Ben Franklin Highway Bridge 11 over Business US 422, Union Township, 12 Bridge Rehabilitation 436,000 13 (Base Construction Allocation - 14 $398,000) 15 (Design and Contingencies - $38,000) 16 (16) SR 0551, Main Street Bridge over 17 Beaver Creek, Little Beaver Township, 18 Bridge Replacement 624,000 19 (Base Construction Allocation - 20 $524,000) 21 (Design and Contingencies - $100,000) 22 (17) SR 2020, Pleasant Road Bridge over 23 Camp Run, Perry Township, Bridge 24 Replacement 400,000 25 (Base Construction Allocation - 26 $300,000) 27 (Design and Contingencies - $100,000) 28 (18) SR 3002, Beaver Dam Road Bridge over 29 Honey Creek, Little Beaver Township, 30 Bridge Painting 30,000 19970S0186B0179 - 197 -
1 (Base Construction Allocation - 2 $25,000) 3 (Design and Contingencies - $5,000) 4 (19) SR 3004, Wallace Road Bridge over 5 Sugar Creek, North Beaver Township, 6 Bridge Replacement 130,000 7 (Base Construction Allocation - 8 $120,000) 9 (Design and Contingencies - $10,000) 10 (20) SR 3004, Wallace Road Bridge over 11 Branch of Honey Creek, North Beaver 12 Township, Bridge Painting 30,000 13 (Base Construction Allocation - 14 $25,000) 15 (Design and Contingencies - $5,000) 16 (21) SR 3004, Wallace Road Bridge over 17 Branch of Honey Creek, North Beaver 18 Township, Bridge Painting 325,000 19 (Base Construction Allocation - 20 $300,000) 21 (Design and Contingencies - $25,000) 22 (22) SR 4006, Coffee Run Bridge over 23 Coffee Run, Mahoning Township, Bridge 24 Replacement 335,000 25 (Base Construction Allocation - 26 $270,000) 27 (Land Allocation - $15,000) 28 (Design and Contingencies - $50,000) 29 Section 42. Lebanon County. 30 (a) Local Bridges 19970S0186B0179 - 198 -
1 (1) Union Township, T-617, Green Point 2 School House Bridge over Trout Run, 3 Bridge Replacement 255,000 4 (Base Construction Allocation - 5 $170,000) 6 (Land Allocation - $10,000) 7 (Design and Contingencies - $75,000) 8 (2) Bethel Township, Market Drive, T-545 9 over Beach Run, Bridge Replacement 30,000 10 (Base Construction Allocation - 11 $20,000) 12 (Design and Contingencies - $10,000) 13 (3) South Londonderry Township, Patrick 14 Road, T-331 over Tributary of Little 15 Conewago Creek, Bridge Rehabilitation 5,000 16 (Base Construction Allocation - $4,000) 17 (Design and Contingencies - $1,000) 18 (4) South Londonderry Township, Eckert 19 Road, T-304 over Little Conewago Creek, 20 Bridge Rehabilitation 5,000 21 (Base Construction Allocation - $4,000) 22 (Design and Contingencies - $1,000) 23 (5) South Londonderry Township, Risser 24 Road, T-300 over Conewago Creek, Bridge 25 Rehabilitation 4,000 26 (Base Construction Allocation - $3,000) 27 (Design and Contingencies - $1,000) 28 (6) South Londonderry Township, Long Road, 29 T-304 over Tributary of Conewago Creek, 30 Bridge Rehabilitation 4,000 19970S0186B0179 - 199 -
1 (Base Construction Allocation - $3,000) 2 (Design and Contingencies - $1,000) 3 (7) South Londonderry Township, Eckert 4 Road, T-304 over Tributary of Little 5 Conewago Creek, Bridge Rehabilitation 5,000 6 (Base Construction Allocation - $4,000) 7 (Design and Contingencies - $1,000) 8 (8) South Londonderry Township, Church 9 Road, T-303 over Unnamed Creek, Bridge 10 Rehabilitation 3,000 11 (Base Construction Allocation - $2,000) 12 (Design and Contingencies - $1,000) 13 (9) South Londonderry Township, Patrick 14 Road, T-331 over Tributary of Little 15 Conewago Creek, Bridge Rehabilitation 4,000 16 (Base Construction Allocation - $3,000) 17 (Design and Contingencies - $1,000) 18 (10) South Londonderry Township, Hinkle 19 Road, T-433 over Killinger Creek, 20 Bridge Rehabilitation 4,000 21 (Base Construction Allocation - $3,000) 22 (Design and Contingencies - $1,000) 23 (11) South Londonderry Township, Brandt 24 Road, T-346 over Killinger Creek, 25 Bridge Rehabilitation 3,000 26 (Base Construction Allocation - $2,000) 27 (Design and Contingencies - $1,000) 28 (12) Union Township, Green Point School 29 House Road, T-617 over Trout Run, 30 Bridge Replacement 90,000 19970S0186B0179 - 200 -
1 (Base Construction Allocation - 2 $70,000) 3 (Design and Contingencies - $20,000) 4 (b) State Bridges (Reserved) 5 Section 43. Lehigh County. 6 (a) Local Bridges (Reserved) 7 (b) State Bridges 8 (1) SR 4007, Schlicher's Bridge over 9 Jordan Creek, North Whitehall Township, 10 Bridge Replacement 875,000 11 (Base Construction Allocation - 12 $560,000) 13 (Land Allocation - $145,000) 14 (Design and Contingencies - $170,000) 15 (2) SR 3011, Farmington Road over 16 Tributary of Schaffer Run, Upper 17 Macungie Township, Bridge 18 Rehabilitation 330,000 19 (Base Construction Allocation - 20 $175,000) 21 (Land Allocation - $55,000) 22 (Design and Contingencies - $100,000) 23 (3) SR 1027, Cold Springs Road over Spring 24 Creek, Whitehall Township, Bridge 25 Replacement 2,550,000 26 (Base Construction Allocation - 27 $1,640,000) 28 (Land Allocation - $420,000) 29 (Design and Contingencies - $490,000) 30 Section 44. Luzerne County. 19970S0186B0179 - 201 -
1 (a) Local Bridges 2 (1) Ashley Borough, Ashley Street Bridge, 3 Bridge Removal 260,000 4 (Base Construction Allocation - 5 $200,000) 6 (Land Allocation - $5,000) 7 (Design and Contingencies - $55,000) 8 (2) Franklin Township, T-784, Bridge over 9 Sutton Creek, Bridge Replacement 320,000 10 (Base Construction Allocation - 11 $250,000) 12 (Land Allocation - $15,000) 13 (Design and Contingencies - $55,000) 14 (3) Black Creek Township, T-309 over Falls 15 Run Creek, Bridge Replacement 395,000 16 (Base Construction Allocation - 17 $265,000) 18 (Land Allocation - $5,000) 19 (Design and Contingencies - $125,000) 20 (4) Black Creek Township, T-314 over 21 Branch of Black Creek, Bridge 22 Replacement 440,000 23 (Base Construction Allocation - 24 $310,000) 25 (Land Allocation - $5,000) 26 (Design and Contingencies - $125,000) 27 (5) Butler Township, T-356 over Nescopeck 28 Creek, Bridge Replacement 405,000 29 (Base Construction Allocation - 30 $275,000) 19970S0186B0179 - 202 -
1 (Land Allocation - $5,000) 2 (Design and Contingencies - $125,000) 3 (6) City of Wilkes-Barre, Division Street 4 over Solomon's Creek, Bridge 5 Replacement 955,000 6 (Base Construction Allocation - 7 $800,000) 8 (Land Allocation - $5,000) 9 (Design and Contingencies - $150,000) 10 (7) Dallas Township, County Road No.12 11 over Toby's Creek, Bridge Replacement 405,000 12 (Base Construction Allocation - 13 $275,000) 14 (Land Allocation - $5,000) 15 (Design and Contingencies - $125,000) 16 (8) Dennison Township, County Road No.41 17 over Nescopeck Creek, Bridge 18 Replacement 405,000 19 (Base Construction Allocation - 20 $275,000) 21 (Land Allocation - $5,000) 22 (Design and Contingencies - $125,000) 23 (9) Dorrance Township, County Road No.30 24 over Wapwallopen Creek, Bridge 25 Replacement 405,000 26 (Base Construction Allocation - 27 $275,000) 28 (Land Allocation - $5,000) 29 (Design and Contingencies - $125,000) 30 (10) Fairmount Township, T-563 over Maple 19970S0186B0179 - 203 -
1 Run Creek, Bridge Replacement 395,000 2 (Base Construction Allocation - 3 $265,000) 4 (Land Allocation - $5,000) 5 (Design and Contingencies - $125,000) 6 (11) Franklin Township, T-782 over Sutton 7 Creek, Bridge Replacement 405,000 8 (Base Construction Allocation - 9 $275,000) 10 (Land Allocation - $5,000) 11 (Design and Contingencies - $125,000) 12 (12) Hunlock Township, T-534 over Hunlock 13 Creek, Bridge Replacement 405,000 14 (Base Construction Allocation - 15 $275,000) 16 (Land Allocation - $5,000) 17 (Design and Contingencies - $125,000) 18 (13) Jackson Township, County Road No.16 19 over Toby's Creek, Bridge Replacement 350,000 20 (Base Construction Allocation - 21 $225,000) 22 (Land Allocation - $5,000) 23 (Design and Contingencies - $120,000) 24 (14) Jackson Township, County Road No.16 25 over Toby's Creek, Bridge Replacement 370,000 26 (Base Construction Allocation - 27 $240,000) 28 (Land Allocation - $5,000) 29 (Design and Contingencies - $125,000) 30 (15) Jackson Township, T-605 over Branch 19970S0186B0179 - 204 -
1 of Harvey's Creek, Bridge Replacement 395,000 2 (Base Construction Allocation - 3 $265,000) 4 (Land Allocation - $5,000) 5 (Design and Contingencies - $125,000) 6 (16) Jackson Township, County Road No.13 7 over Toby's Creek, Bridge Replacement 395,000 8 (Base Construction Allocation - 9 $265,000) 10 (Land Allocation - $5,000) 11 (Design and Contingencies - $125,000) 12 (17) Lake Township, T-796 over Beaver Run 13 Creek, Bridge Replacement 410,000 14 (Base Construction Allocation - 15 $280,000) 16 (Land Allocation - $5,000) 17 (Design and Contingencies - $125,000) 18 (18) Lake Township, T-779 over Bryant Pond 19 Outlet, Bridge Replacement 430,000 20 (Base Construction Allocation - 21 $300,000) 22 (Land Allocation - $5,000) 23 (Design and Contingencies - $125,000) 24 (19) Nescopeck Township, T-381 over Branch 25 of Nescopeck Creek, Bridge Replacement 410,000 26 (Base Construction Allocation - 27 $280,000) 28 (Land Allocation - $5,000) 29 (Design and Contingencies - $125,000) 30 (20) Ross Township, T-680 over Huntingdon 19970S0186B0179 - 205 -
1 Creek, Bridge Replacement 410,000 2 (Base Construction Allocation - 3 $280,000) 4 (Land Allocation - $5,000) 5 (Design and Contingencies - $125,000) 6 (21) Ross Township, T-571 over Outlet 7 North Pond, Bridge Replacement 420,000 8 (Base Construction Allocation - 9 $290,000) 10 (Land Allocation - $5,000) 11 (Design and Contingencies - $125,000) 12 (22) Ross Township, T-575 over Huntingdon 13 Creek, Bridge Replacement 455,000 14 (Base Construction Allocation - 15 $325,000) 16 (Land Allocation - $5,000) 17 (Design and Contingencies - $125,000) 18 (23) Ross Township, County Road No.2 over 19 Marsh Creek, Bridge Replacement 440,000 20 (Base Construction Allocation - 21 $310,000) 22 (Land Allocation - $5,000) 23 (Design and Contingencies - $125,000) 24 (24) Sugarloaf Township, T-332 over Branch 25 of Nescopeck Creek, Bridge Replacement 430,000 26 (Base Construction Allocation - 27 $300,000) 28 (Land Allocation - $5,000) 29 (Design and Contingencies - $125,000) 30 (25) Plymouth Township, T-497 over Mud 19970S0186B0179 - 206 -
1 Pond Inlet, Bridge Replacement 405,000 2 (Base Construction Allocation - 3 $275,000) 4 (26) Slocum Township, T-454 over Black 5 Creek, Bridge Replacement 395,000 6 (Base Construction Allocation - 7 $265,000) 8 (Land Allocation - $5,000) 9 (Design and Contingencies - $125,000) 10 (27) Wright Township, County Road No.21 11 over Wapwallopen Creek, Bridge 12 Replacement 395,000 13 (Base Construction Allocation - 14 $265,000) 15 (Land Allocation - $5,000) 16 (Design and Contingencies - $125,000) 17 (b) State Bridges 18 (1) SR 0011, Erie-Lackawanna Railroad 19 Bridge over Erie-Lackawanna Railroad, 20 Plymouth Township, Bridge Removal 185,000 21 (Base Construction Allocation - 22 $150,000) 23 (Land Allocation - $10,000) 24 (Design and Contingencies - $25,000) 25 (2) SR 1030, Harvey's Lake Bridge at 26 Junction of SR 1053, Lake Township, 27 Bridge Replacement 460,000 28 (Base Construction Allocation - 29 $350,000) 30 (Land Allocation - $20,000) 19970S0186B0179 - 207 -
1 (Design and Contingencies - $90,000) 2 (3) SR 3007, Bridge over Wapwallopen 3 Creek, South of SR 3010, Dorrance 4 Township, Bridge Replacement 530,000 5 (Base Construction Allocation - 6 $420,000) 7 (Land Allocation - $10,000) 8 (Design and Contingencies - $100,000) 9 (4) State Bridges, Countywide Bridge Zone 10 Painting, Bridge Painting 370,000 11 (Base Construction Allocation - 12 $350,000) 13 (Land Allocation - $10,000) 14 (Design and Contingencies - $10,000) 15 Section 45. Lycoming County. 16 (a) Local Bridges 17 (1) Mifflin Township, T-651 over Larry's 18 Creek, Bridge Replacement 528,000 19 (Base Construction Allocation - 20 $438,000) 21 (Land Allocation - $20,000) 22 (Design and Contingencies - $70,000) 23 (2) McIntyre Township, T-667, Rolston 24 Bridge over Lycoming Creek, Bridge 25 Replacement 1,620,000 26 (Base Construction Allocation - 27 $1,400,000) 28 (Land Allocation - $20,000) 29 (Design and Contingencies - $200,000) 30 (b) State Bridges 19970S0186B0179 - 208 -
1 (1) SR 0220, Quenshukeny Run Bridge over 2 Quenshukeny Run, Village of Linden, 3 Bridge Replacement 395,000 4 (Base Construction Allocation - 5 $316,000) 6 (Land Allocation - $20,000) 7 (Design and Contingencies - $59,000) 8 (2) SR 0973, Bridge over Hoagland Run, 3 9 Miles West of Cogan Station, Bridge 10 Rehabilitation 195,000 11 (Base Construction Allocation - 12 $156,000) 13 (Land Allocation - $10,000) 14 (Design and Contingencies - $29,000) 15 (3) SR 1006, Wallis Run Bridge over Wallis 16 Run, Cascade Township, Bridge 17 Replacement 65,000 18 (Base Construction Allocation - 19 $50,000) 20 (Land Allocation - $5,000) 21 (Design and Contingencies - $10,000) 22 (4) SR 2022, Mill Creek Bridge, North of 23 Montoursville, Bridge Replacement 668,000 24 (Base Construction Allocation - 25 $575,000) 26 (Land Allocation - $43,000) 27 (Design and Contingencies - $50,000) 28 (5) SR 2051, Wolf Run Bridge over Wolf 29 Run, South of SR 0220, Muncy Township, 30 Bridge Replacement 638,000 19970S0186B0179 - 209 -
1 (Base Construction Allocation - 2 $510,000) 3 (Land Allocation - $32,000) 4 (Design and Contingencies - $96,000) 5 (6) SR 3024, Jobs Run Road Bridge over 6 Tributary of Larrys Creek, East of 7 Salladasburg, Bridge Replacement 108,000 8 (Base Construction Allocation - 9 $92,000) 10 (Land Allocation - $8,000) 11 (Design and Contingencies - $8,000) 12 (7) SR 3028, West 4th Street, Lycoming 13 Creek Bridge, City of Williamsport, 14 Bridge Rehabilitation 216,000 15 (Base Construction Allocation - 16 $185,000) 17 (Land Allocation - $15,000) 18 (Design and Contingencies - $16,000) 19 (8) SR 0044, Bridge over Conrail, Bridge 20 Painting 210,000 21 (Base Construction Allocation - 22 $200,000) 23 (Design and Contingencies - $10,000) 24 (9) SR 0180, I-180 Eastbound Bridge over 25 Loyalsock Creek, Bridge Painting 135,000 26 (Base Construction Allocation - 27 $125,000) 28 (Design and Contingencies - $10,000) 29 (10) SR 0180, I-180 Westbound Bridge over 30 Loyalsock Creek, Bridge Painting 135,000 19970S0186B0179 - 210 -
1 (Base Construction Allocation - 2 $125,000) 3 (Design and Contingencies - $10,000) 4 (11) SR 2014, Bridge over Lycoming Creek, 5 Bridge Painting 780,000 6 (Base Construction Allocation - 7 $770,000) 8 (Design and Contingencies - $10,000) 9 (12) SR 2061, Bridge over Little Muncy 10 Creek, Bridge Painting 80,000 11 (Base Construction Allocation - 12 $70,000) 13 (Design and Contingencies - $10,000) 14 (13) SR 0014, SR 0014 over Trout Run, 15 Lewis Township, Bridge Replacement 640,000 16 (Base Construction Allocation - 17 $512,000) 18 (Land Allocation - $32,000) 19 (Design and Contingencies - $96,000) 20 (14) SR 0044, SR 0044 over Ramsey Run, 21 Cummings Township, Bridge Replacement 394,000 22 (Base Construction Allocation - 23 $315,000) 24 (Land Allocation - $20,000) 25 (Design and Contingencies - $59,000) 26 (15) SR 0044, SR 0044 over Pine Bottom 27 Run, Cummings Township, Bridge 28 Replacement 360,000 29 (Base Construction Allocation - 30 $288,000) 19970S0186B0179 - 211 -
1 (Land Allocation - $18,000) 2 (Design and Contingencies - $54,000) 3 (16) SR 0118, SR 0118 over Big Run, 4 Franklin Township, Bridge Replacement 382,000 5 (Base Construction Allocation - 6 $307,000) 7 (Land Allocation - $19,000) 8 (Design and Contingencies - $56,000) 9 (17) SR 0284, SR 0284 over Blacks Creek, 10 Pine Township, Bridge Replacement 700,000 11 (Base Construction Allocation - 12 $570,000) 13 (Land Allocation - $30,000) 14 (Design and Contingencies - $100,000) 15 (18) SR 0405, SR 0405 over West Branch of 16 Susquehanna River, Muncy Creek 17 Township, Bridge Replacement 24,924,000 18 (Base Construction Allocation - 19 $19,939,000) 20 (Land Allocation - $1,246,000) 21 (Design and Contingencies - $3,739,000) 22 (19) SR 0654, SR 0654 over Mosquito Creek, 23 Anthony Township, Bridge Replacement 674,000 24 (Base Construction Allocation - 25 $539,000) 26 (Land Allocation - $34,000) 27 (Design and Contingencies - $101,000) 28 (20) SR 0973, SR 0973 over Mud Run, 29 Mifflin Township, Bridge Replacement 294,000 30 (Base Construction Allocation - 19970S0186B0179 - 212 -
1 $252,000) 2 (Land Allocation - $20,000) 3 (Design and Contingencies - $22,000) 4 (21) SR 1005, SR 1005 over Plunketts 5 Creek, Plunketts Creek Township, Bridge 6 Replacement 366,000 7 (Base Construction Allocation - 8 $293,000) 9 (Land Allocation - $18,000) 10 (Design and Contingencies - $55,000) 11 (22) SR 2061, SR 2061 over Sugar Run, 12 Moreland Township, Bridge Replacement 443,000 13 (Base Construction Allocation - 14 $354,000) 15 (Land Allocation - $22,000) 16 (Design and Contingencies - $67,000) 17 (23) SR 2085, SR 2085 over Muncy Creek, 18 Penn Township, Bridge Replacement 1,050,000 19 (Base Construction Allocation - 20 $840,000) 21 (Land Allocation - $53,000) 22 (Design and Contingencies - $157,000) 23 (24) SR 0405, East Water Street over Glade 24 Run, Muncy Borough, Bridge Replacement 500,000 25 (Base Construction Allocation - 26 $350,000) 27 (Land Allocation - $50,000) 28 (Design and Contingencies - $100,000) 29 Section 46. McKean County. 30 (a) Local Bridges 19970S0186B0179 - 213 -
1 (1) Foster Township, T-359, Garlock Hollow 2 Bridge over Kendall Creek, Bridge 3 Replacement 580,000 4 (Base Construction Allocation - 5 $400,000) 6 (Land Allocation - $20,000) 7 (Design and Contingencies - $160,000) 8 (b) State Bridges 9 (1) SR 3009, Kinzua Creek Bridge over 10 Kinzua Creek, Borough of Mt. Jewett, 11 Bridge Replacement 880,000 12 (Base Construction Allocation - 13 $700,000) 14 (Land Allocation - $30,000) 15 (Design and Contingencies - $150,000) 16 (2) SR 4005, Kendall Creek Bridge over 17 Kendall Creek, City of Bradford, Bridge 18 Replacement 800,000 19 (Base Construction Allocation - 20 $650,000) 21 (Land Allocation - $50,000) 22 (Design and Contingencies - $100,000) 23 Section 47. Mercer County. 24 (a) Local Bridges 25 (1) City of Sharon, Service Avenue Bridge 26 over Pine Run, Bridge Replacement 240,000 27 (Base Construction Allocation - 28 $210,000) 29 (Land Allocation - $5,000) 30 (Design and Contingencies - $25,000) 19970S0186B0179 - 214 -
1 (2) City of Sharon, Wengler Avenue Bridge 2 over Pine Hollow Run, Bridge 3 Replacement 218,000 4 (Base Construction Allocation - 5 $193,000) 6 (Land Allocation - $5,000) 7 (Design and Contingencies - $20,000) 8 (3) Pine Township, T-355, Pinchlong Road 9 Bridge over Swamp Run, Bridge 10 Replacement 203,000 11 (Base Construction Allocation - 12 $178,000) 13 (Land Allocation - $5,000) 14 (Design and Contingencies - $20,000) 15 (4) Pine Township, T-878, Diamond Road 16 Bridge over Wolf Creek, Bridge 17 Replacement 1,813,000 18 (Base Construction Allocation - 19 $1,668,000) 20 (Land Allocation - $60,000) 21 (Design and Contingencies - $85,000) 22 (5) Pine Township, T-413, Daugherty Road 23 Bridge over Wolf Run, Bridge 24 Replacement 407,000 25 (Base Construction Allocation - 26 $352,000) 27 (Land Allocation - $15,000) 28 (Design and Contingencies - $40,000) 29 (6) Shenango Township, T-955, Oak Hill 30 Road Bridge over Turkey Run, Bridge 19970S0186B0179 - 215 -
1 Replacement 297,000 2 (Base Construction Allocation - 3 $257,000) 4 (Land Allocation - $10,000) 5 (Design and Contingencies - $30,000) 6 (7) Shenango Township, Heasley Road Bridge 7 over Tributary of Shenango River, 8 Bridge Replacement 173,000 9 (Base Construction Allocation - 10 $155,000) 11 (Land Allocation - $3,000) 12 (Design and Contingencies - $15,000) 13 (8) Springfield Township, T-722, Spring 14 Road Bridge over Mill Run, Bridge 15 Replacement 230,000 16 (Base Construction Allocation - 17 $200,000) 18 (Land Allocation - $5,000) 19 (Design and Contingencies - $25,000) 20 (9) Worth Township, T-912, Jack Atwell 21 Road Bridge over Wolf Creek, Bridge 22 Replacement 297,000 23 (Base Construction Allocation - 24 $257,000) 25 (Land Allocation - $10,000) 26 (Design and Contingencies - $30,000) 27 (b) State Bridges 28 (1) SR 0058, SR 0058 over Sugar Creek, 29 Greene Township, Bridge Replacement 270,000 30 (Base Construction Allocation - 19970S0186B0179 - 216 -
1 $200,000) 2 (Land Allocation - $20,000) 3 (Design and Contingencies - $50,00) 4 (2) SR 0058, SR 0058 over Tributary of 5 Shenango River, Greenville Borough, 6 Bridge Replacement 250,000 7 (Base Construction Allocation - 8 $200,000) 9 (Land Allocation - $20,000) 10 (Design and Contingencies - $30,000) 11 (3) SR 0058, SR 0058 over I-79, Findley 12 Township, Bridge Replacement 1,630,000 13 (Base Construction Allocation - 14 $1,500,000) 15 (Land Allocation - $30,000) 16 (Design and Contingencies - $100,000) 17 (4) SR 0062, SR 0062 over Shenango 18 River/Riverside Drive, City of Sharon, 19 Bridge Replacement 2,780,000 20 (Base Construction Allocation - 21 $2,500,000) 22 (Land Allocation - $30,000) 23 (Design and Contingencies - $250,000) 24 (5) SR 0158, SR 0158 over Little 25 Neshannock Creek, Wilmington Township, 26 Bridge Replacement 770,000 27 (Base Construction Allocation - 28 $650,000) 29 (Land Allocation - $40,000) 30 (Design and Contingencies - $80,000) 19970S0186B0179 - 217 -
1 (6) SR 0173, SR 0173 over Mill Creek, New 2 Lebanon Borough, Bridge Replacement 430,000 3 (Base Construction Allocation - 4 $350,000) 5 (Land Allocation - $20,000) 6 (Design and Contingencies - $60,000) 7 (7) SR 0208, SR 0208 over Wolf Creek, 8 Grove City Borough, Bridge Replacement 1,000,000 9 (Base Construction Allocation - 10 $870,000) 11 (Land Allocation - $30,000) 12 (Design and Contingencies - $100,000) 13 (8) SR 0258, SR 0258 over Daley Run, 14 Jefferson Township, Bridge Replacement 430,000 15 (Base Construction Allocation - 16 $350,000) 17 (Land Allocation - $20,000) 18 (Design and Contingencies - $60,000) 19 (9) SR 0318, SR 0318 over Shenango 20 River/Street/Railroad, West Middlesex 21 Borough, Bridge Replacement 4,400,000 22 (Base Construction Allocation - 23 $3,700,000) 24 (Land Allocation - $100,000) 25 (Design and Contingencies - $600,000) 26 (10) SR 0518, SR 0518 over Pine Hollow 27 Run, City of Hermitage, Bridge 28 Replacement 410,000 29 (Base Construction Allocation - 30 $300,000) 19970S0186B0179 - 218 -
1 (Land Allocation - $30,000) 2 (Design and Contingencies - $80,000) 3 (11) SR 0846, SR 0846 over Shenango 4 Reservoir, South Pymatuning Township, 5 Bridge Replacement 1,500,000 6 (Base Construction Allocation - 7 $1,340,000) 8 (Land Allocation - $10,000) 9 (Design and Contingencies - $150,000) 10 (12) SR 2006, SR 2006 over I-79, 11 Springfield Township, Bridge 12 Replacement 1,100,000 13 (Base Construction Allocation - 14 $1,000,000) 15 (Land Allocation - $10,000) 16 (Design and Contingencies - $90,000) 17 (13) SR 2014, SR 2014 over Mill Creek, 18 Findley Township, Bridge Replacement 330,000 19 (Base Construction Allocation - 20 $240,000) 21 (Land Allocation - $20,000) 22 (Design and Contingencies - $70,000) 23 (14) SR 2025, SR 2025 over Lake Barmore 24 Outlet, Pine Township, Bridge 25 Replacement 300,000 26 (Base Construction Allocation - 27 $230,000) 28 (Land Allocation - $10,000) 29 (Design and Contingencies - $60,000) 30 (15) SR 3011, SR 3011 over I-80, Shenango 19970S0186B0179 - 219 -
1 Township, Bridge Replacement 810,000 2 (Base Construction Allocation - 3 $700,000) 4 (Land Allocation - $10,000) 5 (Design and Contingencies - $100,000) 6 (16) SR 4014, SR 4014 over Shenango River, 7 Delaware Township, Bridge Replacement 920,000 8 (Base Construction Allocation - 9 $800,000) 10 (Land Allocation - $20,000) 11 (Design and Contingencies - $100,000) 12 Section 48. Mifflin County. 13 (a) Local Bridges 14 (1) Oliver Township, T-803, Bridge over 15 Musser Run, Bridge Replacement 492,000 16 (Base Construction Allocation - 17 $390,000) 18 (Land Allocation - $2,000) 19 (Design and Contingencies - $100,000) 20 (b) State Bridges 21 (1) SR 0022, Bridge over Kish Creek, 22 Lewistown Borough, Bridge Painting 800,000 23 (Base Construction Allocation - 24 $720,000) 25 (Design and Contingencies - $80,000) 26 (2) SR 3017, Bridge over Juniata River, 27 Wayne Township, Bridge Painting 935,000 28 (Base Construction Allocation - 29 $850,000) 30 (Design and Contingencies - $85,000) 19970S0186B0179 - 220 -
1 Section 49. Monroe County. 2 (a) Local Bridges (Reserved) 3 (b) State Bridges 4 (1) SR 0447, SR 0447 over Broadhead Creek 5 and Railroad, Stroud Township, Bridge 6 Rehabilitation 1,395,000 7 (Base Construction Allocation - 8 $1,071,000) 9 (Design and Contingencies - $324,000) 10 (2) SR 3003, Silver Spring Boulevard over 11 Chapple Creek, Eldred Township, Bridge 12 Replacement 280,000 13 (Base Construction Allocation - 14 $130,000) 15 (Land Allocation - $50,000) 16 (Design and Contingencies - $100,000) 17 (3) SR 2012, SR 2012 over Broadhead Creek, 18 East Stroudsburg Borough, Bridge 19 Rehabilitation 1,500,000 20 (Base Construction Allocation - 21 $1,150,000) 22 (Design and Contingencies - $350,000) 23 (4) SR 0080, I-80 Westbound over 24 Tunkhannock Creek at County Line, 25 Tobyhanna Township, Bridge 26 Rehabilitation 935,000 27 (Base Construction Allocation - 28 $720,000) 29 (Design and Contingencies - $215,000) 30 (5) SR 0080, I-80 Eastbound over 19970S0186B0179 - 221 -
1 Tunkhannock Creek at County Line, 2 Tunkhannock Township, Bridge 3 Rehabilitation 935,000 4 (Base Construction Allocation - 5 $720,000) 6 (Design and Contingencies - $215,000) 7 (6) SR 4003, SR 4003 over Lehigh River at 8 Lackawanna County Line, Coolbaugh 9 Township, Bridge Rehabilitation 390,000 10 (Base Construction Allocation - 11 $295,000) 12 (Design and Contingencies - $95,000) 13 (7) Norristown Borough, Markley Street 14 Bridge over Stoney Creek, Bridge 15 Replacement 1,250,000 16 (Base Construction Allocation - 17 $1,000,000) 18 (Land Allocation - $50,000) 19 (Design and Contingencies - $200,000) 20 (8) Norristown Borough, Markley Street 21 Bridge over Stoney Creek, Bridge 22 Rehabilitation 500,000 23 (Base Construction Allocation - 24 $400,000) 25 (Land Allocation - $10,000) 26 (Design and Contingencies - $90,000) 27 (9) Horsham Township, Davis Grove Road 28 over Park Creek, Bridge Replacement 300,000 29 (Base Construction Allocation - 30 $230,000) 19970S0186B0179 - 222 -
1 (Land Allocation - $20,000) 2 (Design and Contingencies - $50,000) 3 (10) Franconia Township, Keller Creamery 4 Road over Indian Creek, Bridge 5 Replacement 320,000 6 (Base Construction Allocation - 7 $250,000) 8 (Land Allocation - $20,000) 9 (Design and Contingencies - $50,000) 10 (11) East Norriton Township, Germantown 11 Pike over Five Mile Run Creek, Bridge 12 Replacement 500,000 13 (Base Construction Allocation - 14 $430,000) 15 (Land Allocation - $20,000) 16 (Design and Contingencies - $50,000) 17 (12) Upper Hanover Township, Eleventh 18 Street over Macoby Creek, Bridge 19 Replacement 400,000 20 (Base Construction Allocation - 21 $340,000) 22 (Land Allocation - $20,000) 23 (Design and Contingencies - $40,000) 24 (13) Lower Merion Township, Black Rock 25 Road over Mill Creek, Bridge 26 Replacement 350,000 27 (Base Construction Allocation - 28 $295,000) 29 (Land Allocation - $20,000) 30 (Design and Contingencies - $35,000) 19970S0186B0179 - 223 -
1 (14) Lower Merion Township, Morris Road 2 over Mill Creek, Bridge Replacement 350,000 3 (Base Construction Allocation - 4 $285,000) 5 (Land Allocation - $20,000) 6 (Design and Contingencies - $45,000) 7 (15) Upper Merion Township, Conrail over 8 South Gulph Road, Bridge Replacement 4,500,000 9 (Base Construction Allocation - 10 $4,250,000) 11 (Land Allocation - $50,000) 12 (Design and Contingencies - $200,000) 13 (16) Trappe Borough, College Avenue over 14 Buckwalter Tributary, Bridge 15 Replacement 140,000 16 (Base Construction Allocation - 17 $120,000) 18 (Design and Contingencies - $20,000) 19 Section 50. Montgomery County. 20 (a) Local Bridges 21 (1) Norristown Borough, Hospital Bridge 22 over Stony Creek, Bridge Replacement 412,000 23 (Base Construction Allocation - 24 $365,000) 25 (Land Allocation - $10,000) 26 (Design and Contingencies - $37,000) 27 (2) Trappe Borough, College Avenue Bridge 28 over Tributary of Perkiomen Creek, 29 Bridge Replacement 360,000 30 (Base Construction Allocation - 19970S0186B0179 - 224 -
1 $300,000) 2 (Land Allocation - $10,000) 3 (Design and Contingencies - $50,000) 4 (3) Towamencin Township, Bustard Road 5 Bridge over Towamencin Creek, Bridge 6 Replacement 454,000 7 (Base Construction Allocation - 8 $400,000) 9 (Land Allocation - $10,000) 10 (Design and Contingencies - $44,000) 11 (4) Upper Hanover Township, T-444, 12 Treichler Road Bridge under Reading 13 Railroad, Bridge Removal 151,000 14 (Base Construction Allocation - 15 $126,000) 16 (Land Allocation - $5,000) 17 (Design and Contingencies - $20,000) 18 (5) Upper Providence Township, T-400, 19 Supio Road Bridge under Reading 20 Railroad, Bridge Removal 187,000 21 (Base Construction Allocation - 22 $157,000) 23 (Land Allocation - $5,000) 24 (Design and Contingencies - $25,000) 25 (6) Upper Salford Township, T-444, Bridge 26 over Abandoned Railroad, Bridge 27 Removal 1,175,000 28 (Base Construction Allocation - 29 $1,000,000) 30 (Land Allocation - $25,000) 19970S0186B0179 - 225 -
1 (Design and Contingencies - $150,000) 2 (7) Norristown Borough, Markley Street 3 Bridge over Stoney Creek, Bridge 4 Replacement 1,250,000 5 (Base Construction Allocation - 6 $1,000,000) 7 (Land Allocation - $50,000) 8 (Design and Contingencies - $200,000) 9 (8) Norristown Borough, Markley Street 10 Bridge over Stoney Creek, Bridge 11 Rehabilitation 500,000 12 (Base Construction Allocation - 13 $400,000) 14 (Land Allocation - $10,000) 15 (Design and Contingencies - $90,000) 16 (9) Horsham Township, Davis Grove Road 17 over Park Creek, Bridge Replacement 300,000 18 (Base Construction Allocation - 19 $230,000) 20 (Land Allocation - $20,000) 21 (Design and Contingencies - $50,000) 22 (10) Franconia Township, Keller Creamery 23 Road over Indian Creek, Bridge 24 Replacement 320,000 25 (Base Construction Allocation - 26 $250,000) 27 (Land Allocation - $20,000) 28 (Design and Contingencies - $50,000) 29 (11) East Norriton Township, Germantown 30 Pike over Five Mile Run Creek, Bridge 19970S0186B0179 - 226 -
1 Replacement 500,000 2 (Base Construction Allocation - 3 $430,000) 4 (Land Allocation - $20,000) 5 (Design and Contingencies - $50,000) 6 (12) Upper Hanover Township, Eleventh 7 Street over Macoby Creek, Bridge 8 Replacement 400,000 9 (Base Construction Allocation - 10 $340,000) 11 (Land Allocation - $20,000) 12 (Design and Contingencies - $40,000) 13 (13) Lower Merion Township, Black Rock 14 Road over Mill Creek, Bridge 15 Replacement 350,000 16 (Base Construction Allocation - 17 $295,000) 18 (Land Allocation - $20,000) 19 (Design and Contingencies - $35,000) 20 (14) Lower Merion Township, Morris Road 21 over Mill Creek, Bridge Replacement 350,000 22 (Base Construction Allocation - 23 $285,000) 24 (Land Allocation - $20,000) 25 (Design and Contingencies - $45,000) 26 (15) Upper Merion Township, Conrail over 27 South Gulph Road, Bridge Replacement 4,500,000 28 (Base Construction Allocation - 29 $4,250,000) 30 (Land Allocation - $50,000) 19970S0186B0179 - 227 -
1 (Design and Contingencies - $200,000) 2 (16) Trappe Borough, College Avenue over 3 Buckwalter Tributary, Bridge 4 Replacement 140,000 5 (Base Construction Allocation - 6 $120,000) 7 (Design and Contingencies - $20,000) 8 (b) State Bridges 9 (1) SR 2009, Byberry Road Bridge over 10 Southampton Creek, Upper Moreland 11 Township and Bryn Athyn Borough, 12 Historic Bridge Replacement 680,000 13 (Base Construction Allocation - 14 $500,000) 15 (Land Allocation - $20,000) 16 (Design and Contingencies - $160,000) 17 (2) SR 2018, Bethlehem Pike Bridge over 18 Branch of Wissahickon Creek, 19 Springfield Township, Bridge 20 Rehabilitation 525,000 21 (Base Construction Allocation - 22 $400,000) 23 (Land Allocation - $25,000) 24 (Design and Contingencies - $100,000) 25 (3) SR 4030, New Hanover Square Road 26 Bridge over West Swamp Creek (Two 27 Bridges), New Hanover Township, Bridge 28 Replacement 1,150,000 29 (Base Construction Allocation - 30 $900,000) 19970S0186B0179 - 228 -
1 (Land Allocation - $50,000) 2 (Design and Contingencies - $200,000) 3 (4) SR 0100, Extended, (Three Bridges), 4 High Street to Farmington Road, 5 Pottstown Borough and Upper Pottsgrove 6 Township, Bridge Rehabilitation 1,650,000 7 (Base Construction Allocation - 8 $1,500,000) 9 (Land Allocation - $50,000) 10 (Design and Contingencies - $100,000) 11 (5) SR 1017, Salfordville Road Bridge over 12 East Branch of Perkiomen Creek, Lower 13 Salford Township, Bridge Replacement 1,500,000 14 (Base Construction Allocation - 15 $1,250,000) 16 (Land Allocation - $50,000) 17 (Design and Contingencies - $200,000) 18 (6) SR 1024, Salford Station (Two Bridges) 19 over Perkiomen Creek, Upper Salford and 20 Lower Fredrick Townships, Bridge 21 Replacement 1,200,000 22 (Base Construction Allocation - 23 $1,000,000) 24 (Land Allocation - $50,000) 25 (Design and Contingencies - $150,000) 26 (7) SR 3020, Dannehower Bridge over River 27 and New US 202, Upper Merion Township, 28 Bridgeport and Norristown Boroughs, 29 Bridge Painting 872,000 30 (Base Construction Allocation - 19970S0186B0179 - 229 -
1 $802,000) 2 (Design and Contingencies - $70,000) 3 (8) SR 3039, South Gulph Road Overpass 4 under Conrail, Upper Merion Township, 5 Bridge Replacement 1,500,000 6 (Base Construction Allocation - 7 $1,300,000) 8 (Land Allocation - $50,000) 9 (Design and Contingencies - $150,000) 10 (9) SR 4003, Black Rock Road Bridge over 11 Abandoned Reading Track, Upper 12 Providence Township, Bridge Removal 205,000 13 (Base Construction Allocation - 14 $175,000) 15 (Land Allocation - $10,000) 16 (Design and Contingencies - $20,000) 17 (10) SR 4012, Graterford Road Bridge over 18 Perkiomen Creek, Skippack and Perkiomen 19 Townships, Bridge Replacement 1,475,000 20 (Base Construction Allocation - 21 $1,300,000) 22 (Land Allocation - $50,000) 23 (Design and Contingencies - $125,000) 24 Section 51. Montour County. 25 (a) Local Bridges 26 (1) Derry Township, T-407, County Bridge 27 No.13 over West Branch of Chillisquaque 28 Creek near Washingtonville Borough, 29 Bridge Replacement 350,000 30 (Base Construction Allocation - 19970S0186B0179 - 230 -
1 $265,000) 2 (Land Allocation - $35,000) 3 (Design and Contingencies - $50,000) 4 (b) State Bridges 5 (1) SR 1004, Bridge over Chillisquaque 6 Creek, North of Washingtonville 7 Borough, Bridge Replacement 620,000 8 (Base Construction Allocation - 9 $500,000) 10 (Land Allocation - $40,000) 11 (Design and Contingencies - $80,000) 12 (2) SR 1006, Bridge over Branch of 13 Chillisquaque Creek, 3 Miles Northwest 14 of Washingtonville Borough, Bridge 15 Replacement 510,000 16 (Base Construction Allocation - 17 $410,000) 18 (Land Allocation - $25,000) 19 (Design and Contingencies - $80,000) 20 (3) SR 3004, Bridge over Beaver Run, 2 21 Miles West of Moresburg, Bridge 22 Replacement 285,000 23 (Base Construction Allocation - 24 $227,000) 25 (Land Allocation - $14,000) 26 (Design and Contingencies - $44,000) 27 (4) SR 4001, Bridge over Chillisquaque 28 Creek, Anthony Township, Bridge 29 Replacement 458,000 30 (Base Construction Allocation - 19970S0186B0179 - 231 -
1 $366,000) 2 (Land Allocation - $23,000) 3 (Design and Contingencies - $69,000) 4 (5) SR 0011, SR 0011 over Sechler Run, 5 Mahoning Township, Bridge Replacement 582,000 6 (Base Construction Allocation - 7 $466,000) 8 (Land Allocation - $29,000) 9 (Design and Contingencies - $87,000) 10 (6) SR 0054, SR 0054 over Chillisquaque 11 Creek, Anthony Township, Bridge 12 Replacement 547,000 13 (Base Construction Allocation - 14 $438,000) 15 (Land Allocation - $27,000) 16 (Design and Contingencies - $82,000) 17 (7) SR 0642, SR 0642 over Mahoning Creek, 18 West Hemlock Township, Bridge 19 Replacement 213,000 20 (Base Construction Allocation - 21 $170,000) 22 (Land Allocation - $11,000) 23 (Design and Contingencies - $32,000) 24 (8) SR 1009, SR 1009 over Branch of Lowry 25 Run, Anthony Township, Bridge 26 Replacement 431,000 27 (Base Construction Allocation - 28 $345,000) 29 (Land Allocation - $21,000) 30 (Design and Contingencies - $65,000) 19970S0186B0179 - 232 -
1 (9) SR 1011, SR 1011 over Tributary of 2 Chillisquaque Creek, Anthony Township, 3 Bridge Replacement 212,000 4 (Base Construction Allocation - 5 $170,000) 6 (Land Allocation - $11,000) 7 (Design and Contingencies - $31,000) 8 Section 52. Northampton County. 9 (a) Local Bridges 10 (1) Lehigh Township, Indiantrail Road 11 Bridge over Indian Creek, Bridge 12 Painting 16,000 13 (Base Construction Allocation - 14 $14,000) 15 (Design and Contingencies - $2,000) 16 (2) Lehigh Township, T-548, Bridge over 17 Bertsch Creek, Bridge Replacement 400,000 18 (Base Construction Allocation - 19 $300,000) 20 (Land Allocation - $20,000) 21 (Design and Contingencies - $80,000) 22 (3) Lehigh Township, Wood Drive Bridge, 23 Bridge Replacement 65,000 24 (Base Construction Allocation - 25 $41,000) 26 (Land Allocation - $4,000) 27 (Design and Contingencies - $20,000) 28 (b) State Bridges 29 (1) SR 2017, Tatamy Road over Tributary of 30 Bushkill Creek, Palmer Township, Bridge 19970S0186B0179 - 233 -
1 Rehabilitation 240,000 2 (Base Construction Allocation - 3 $100,000) 4 (Land Allocation - $40,000) 5 (Design and Contingencies - $100,000) 6 (2) SR 4020, Maple Drive over Tributary of 7 Bertsch Creek, Lehigh Township, Bridge 8 Rehabilitation 465,000 9 (Base Construction Allocation - 10 $275,000) 11 (Land Allocation - $80,000) 12 (Design and Contingencies - $110,000) 13 Section 53. Northumberland County. 14 (a) Local Bridges 15 (1) Borough of Milton, Ridge Avenue over 16 Limestone Run, Bridge Replacement 520,000 17 (Base Construction Allocation - 18 $380,000) 19 (Land Allocation - $20,000) 20 (Design and Contingencies - $120,000) 21 (2) Lewis Township, T-631, Old State Road 22 Bridge over Branch of Beaver Run, 23 Bridge Replacement 220,000 24 (Base Construction Allocation - 25 $200,000) 26 (Design and Contingencies - $20,000) 27 (b) State Bridges 28 (1) SR 0642, Chillisquaque Creek Bridge 29 over Chillisquaque Creek, 0.5 Mile East 30 of Pottsgrove, Bridge Deck Replacement 1,184,000 19970S0186B0179 - 234 -
1 (Base Construction Allocation - 2 $947,000) 3 (Land Allocation - $59,000) 4 (Design and Contingencies - $178,000) 5 (2) SR 1005, Delaware Run Bridge over 6 Delaware Run, 3 Miles North of 7 Watsontown Borough, Bridge Replacement 509,000 8 (Base Construction Allocation - 9 $408,000) 10 (Land Allocation - $25,000) 11 (Design and Contingencies - $76,000) 12 (3) SR 0045, Bridge over Chillisquaque 13 Creek, East of SR 0147, Bridge 14 Painting 260,000 15 (Base Construction Allocation - 16 $250,000) 17 (Design and Contingencies - $10,000) 18 (4) SR 0054, SR 0054 over North Branch of 19 Shamokin Creek, Mt. Carmel Township, 20 Bridge Replacement 721,000 21 (Base Construction Allocation - 22 $577,000) 23 (Land Allocation - $36,000) 24 (Design and Contingencies - $108,000) 25 (5) SR 2001, SR 2001 over Little Roaring 26 Creek, Rush Township, Bridge 27 Replacement 415,000 28 (Base Construction Allocation - 29 $335,000) 30 (Land Allocation - $20,000) 19970S0186B0179 - 235 -
1 (Design and Contingencies - $60,000) 2 (6) SR 2023, SR 2023 over Conrail, Mt. 3 Carmel Township, Bridge Replacement 1,275,000 4 (Base Construction Allocation - 5 $1,020,000) 6 (Land Allocation - $64,000) 7 (Design and Contingencies - $191,000) 8 (7) SR 4013, SR 4013 over Plum Creek, 9 Rockefeller Township, Bridge 10 Replacement 361,000 11 (Base Construction Allocation - 12 $289,000) 13 (Land Allocation - $18,000) 14 (Design and Contingencies - $54,000) 15 Section 54. Perry County. 16 (a) Local Bridges 17 (1) Tyrone Township, County Bridge No.4, 18 Rices Bridge over Shermans Creek, 19 Covered Bridge Replacement 768,000 20 (Base Construction Allocation - 21 $552,000) 22 (Land Allocation - $77,000) 23 (Design and Contingencies - $139,000) 24 (2) Northeast Madison Township, T-403 over 25 Bixler Run, Bridge Replacement 585,000 26 (Base Construction Allocation - 27 $400,000) 28 (Land Allocation - $10,000) 29 (Design and Contingencies - $175,000) 30 (b) State Bridges 19970S0186B0179 - 236 -
1 (1) SR 4006, Raccoon Creek Bridge over 2 Raccoon Creek, Tuscarora Township, 3 Bridge Replacement 466,000 4 (Base Construction Allocation - 5 $288,000) 6 (Land Allocation - $20,000) 7 (Design and Contingencies - $158,000) 8 (2) SR 3002, Horse Valley Road Bridges 9 (Two Bridges) over Horse Valley Run, 10 Toboyne Township, Bridge Replacement 725,000 11 (Base Construction Allocation - 12 $700,000) 13 (Land Allocation - $5,000) 14 (Design and Contingencies - $20,000) 15 Section 55. Philadelphia County. 16 (a) Local Bridges 17 (1) City of Philadelphia, Byberry Road 18 Bridge over Conrail, Temporary Bridge 19 Construction 511,000 20 (Base Construction Allocation - 21 $390,000) 22 (Land Allocation - $51,000) 23 (Design and Contingencies - $70,000) 24 (2) City of Philadelphia, Wyoming Avenue 25 Bridge over Former Course Frankford 26 Creek, West of Castor Avenue, Bridge 27 Replacement 1,300,000 28 (Base Construction Allocation - 29 $1,200,000) 30 (Design and Contingencies - $100,000) 19970S0186B0179 - 237 -
1 (3) City of Philadelphia, Chelten Avenue 2 Bridge over SEPTA, West of Wayne 3 Avenue, Bridge Replacement 2,300,000 4 (Base Construction Allocation - 5 $2,100,000) 6 (Design and Contingencies - $200,000) 7 (4) City of Philadelphia, Fisher's Lane 8 Bridge over Tacony Creek, West of 9 Ramona Avenue, Bridge Replacement 1,625,000 10 (Base Construction Allocation - 11 $1,400,000) 12 (Design and Contingencies - $225,000) 13 (5) City of Philadelphia, Kingsessing 14 Avenue Bridge over SEPTA, Bridge 15 Replacement 2,550,000 16 (Base Construction Allocation - 17 $2,200,000) 18 (Land Allocation - $100,000) 19 (Design and Contingencies - $250,000) 20 (6) City of Philadelphia, Montgomery 21 Bridge over Amtrak, Bridge Replacement 5,275,000 22 (Base Construction Allocation - 23 $4,750,000) 24 (Land Allocation - $125,000) 25 (Design and Contingencies - $400,000) 26 (7) City of Philadelphia, Thomas Avenue 27 Bridge over SEPTA, Bridge Replacement 3,150,000 28 (Base Construction Allocation - 29 $2,750,000) 30 (Land Allocation - $100,000) 19970S0186B0179 - 238 -
1 (Design and Contingencies - $300,000) 2 (8) City of Philadelphia, Sedgley Avenue 3 Bridge over Conrail, Bridge 4 Replacement 1,000,000 5 (Base Construction Allocation - 6 $800,000) 7 (Land Allocation - $100,000) 8 (Design and Contingencies - $100,000) 9 (9) City of Philadelphia, Lexington Avenue 10 Bridge over Conrail, Bridge 11 Replacement 420,000 12 (Base Construction Allocation - 13 $360,000) 14 (Land Allocation - $20,000) 15 (Design and Contingencies - $40,000) 16 (10) City of Philadelphia, Greenland 17 Bridge over Conrail and I-76, Bridge 18 Replacement 1,350,000 19 (Base Construction Allocation - 20 $1,100,000) 21 (Land Allocation - $100,000) 22 (Design and Contingencies - $150,000) 23 (11) City of Philadelphia, Glenwood Drive 24 Bridge over Conrail, Bridge 25 Replacement 1,450,000 26 (Base Construction Allocation - 27 $1,200,000) 28 (Land Allocation - $100,000) 29 (Design and Contingencies - $150,000) 30 (12) City of Philadelphia, Second Street 19970S0186B0179 - 239 -
1 Bridge over Conrail, Bridge 2 Replacement 740,000 3 (Base Construction Allocation - 4 $650,000) 5 (Land Allocation - $20,000) 6 (Design and Contingencies - $70,000) 7 (13) City of Philadelphia, Cambria Street 8 Bridge over Conrail, Bridge 9 Replacement 2,750,000 10 (Base Construction Allocation - 11 $2,400,000) 12 (Land Allocation - $100,000) 13 (Design and Contingencies - $250,000) 14 (b) State Bridges 15 (1) SR 4007, Germantown Avenue Bridge, 16 Conrail Overpass, City of Philadelphia, 17 Bridge Removal 125,000 18 (Base Construction Allocation - 19 $100,000) 20 (Land Allocation - $10,000) 21 (Design and Contingencies - $15,000) 22 (2) SR 0076, Schuylkill Expressway Bridge 23 over Schuylkill River, City of 24 Philadelphia, Bridge Painting 2,580,000 25 (Base Construction Allocation - 26 $2,390,000) 27 (Design and Contingencies - $190,000) 28 (3) SR 2003, 5th Street Bridge over 29 Amtrak, City of Philadelphia, Bridge 30 Replacement 2,400,000 19970S0186B0179 - 240 -
1 (Base Construction Allocation - 2 $2,000,000) 3 (Land Allocation - $200,000) 4 (Design and Contingencies - $200,000) 5 (4) SR 3008, Chestnut Street Bridge over 6 Schuylkill River, City of Philadelphia, 7 Bridge Painting 477,000 8 (Base Construction Allocation - 9 $426,000) 10 (Design and Contingencies - $51,000) 11 (5) SR 3037, JFK Boulevard Bridge over 12 Schuylkill River, City of Philadelphia, 13 Bridge Painting 857,000 14 (Base Construction Allocation - 15 $794,000) 16 (Design and Contingencies - $63,000) 17 (6) SR 0095, Delaware River Expressway 18 over Westmoreland and Tioga Streets, 19 City of Philadelphia, Bridge 20 Rehabilitation 4,450,000 21 (Base Construction Allocation - 22 $4,200,000) 23 (Land Allocation - $50,000) 24 (Design and Contingencies - $200,000) 25 Section 56. Pike County. 26 (a) Local Bridges (Reserved) 27 (b) State Bridges 28 (1) SR 0390, Bridge Kill Creek Bridge, 29 North of SR 3002, Green Township, 30 Bridge Replacement 430,000 19970S0186B0179 - 241 -
1 (Base Construction Allocation - 2 $340,000) 3 (Land Allocation - $10,000) 4 (Design and Contingencies - $80,000) 5 (2) SR 2011, Bridge over Outlet to Sawkill 6 Pond, South of TR 6, Dingman Township, 7 Bridge Replacement 355,000 8 (Base Construction Allocation - 9 $275,000) 10 (Land Allocation - $10,000) 11 (Design and Contingencies - $70,000) 12 (3) SR 0434, Shohola Bridge over Delaware 13 River, Shohola Township and New York 14 State Line, Bridge Painting 2,200,000 15 (Base Construction Allocation - 16 $2,000,000) 17 (Design and Contingencies - $200,000) 18 (4) State Bridges, Countywide Bridge Zone 19 Painting, Bridge Painting 370,000 20 (Base Construction Allocation - 21 $350,000) 22 (Land Allocation - $10,000) 23 (Design and Contingencies - $10,000) 24 Section 57. (Reserved). 25 Section 58. Schuylkill County. 26 (a) Local Bridges (Reserved) 27 (b) State Bridges 28 (1) SR 0054, SR 0054 over Mahanoy Creek, 29 Mahanoy Township, Bridge Replacement 1,005,000 30 (Base Construction Allocation - 19970S0186B0179 - 242 -
1 $770,000) 2 (Design and Contingencies - $235,000) 3 (2) SR 0054, SR 0054 over Reading Blue 4 Mountain and Northern Railroad, Mahanoy 5 Township, Bridge Rehabilitation 650,000 6 (Base Construction Allocation - 7 $500,000) 8 (Design and Contingencies - $150,000) 9 (3) SR 0081, SR 0081 Southbound over 10 Swatara Creek, Pine Grove Township, 11 Bridge Rehabilitation 970,000 12 (Base Construction Allocation - 13 $745,000) 14 (Design and Contingencies - $225,000) 15 (4) SR 0081, SR 0081 Northbound over 16 Swatara Creek, Pine Grove Township, 17 Bridge Rehabilitation 970,000 18 (Base Construction Allocation - 19 $745,000) 20 (Design and Contingencies - $225,000) 21 (5) SR 0081, SR 0081 Southbound over SR 22 0443 and Exit Ramp 3, Pine Grove 23 Township, Bridge Rehabilitation 715,000 24 (Base Construction Allocation - 25 $550,000) 26 (Design and Contingencies - $165,000) 27 (6) SR 0081, SR 0081 Northbound over SR 28 0443 and Exit Ramp 31, Pine Grove 29 Township, Bridge Rehabilitation 515,000 30 (Base Construction Allocation - 19970S0186B0179 - 243 -
1 $390,000) 2 (Design and Contingencies - $125,000) 3 (7) SR 0081, I-81 Southbound over T-886, 4 Oak Grove Road, Pine Grove Township, 5 Bridge Rehabilitation 300,000 6 (Base Construction Allocation - 7 $200,000) 8 (Design and Contingencies - $100,000) 9 (8) SR 0081, I-81 Northbound over T-886, 10 Oak Grove Road, Pine Grove Township, 11 Bridge Rehabilitation 300,000 12 (Base Construction Allocation - 13 $200,000) 14 (Design and Contingencies - $100,000) 15 (9) SR 0061, Bridge over Mahannon Creek at 16 South Liberty Street, North Manheim 17 Township, Bridge Rehabilitation 265,000 18 (Base Construction Allocation - 19 $175,000) 20 (Design and Contingencies - $90,000) 21 (10) SR 0895, SR 0895 over Lizard Creek, 22 Village of Snyders, West Penn Township, 23 Bridge Rehabilitation 290,000 24 (Base Construction Allocation - 25 $190,000) 26 (Design and Contingencies - $100,000) 27 (11) SR 0901, SR 0901 over Mahanoy Creek, 28 Bridge Rehabilitation 680,000 29 (Base Construction Allocation - 30 $520,000) 19970S0186B0179 - 244 -
1 (Design and Contingencies - $160,000) 2 (12) SR 1011, SR 1011 over Big Creek, 3 Village of Brockton, Schuylkill 4 Township, Bridge Replacement 340,000 5 (Base Construction Allocation - 6 $160,000) 7 (Land Allocation - $55,000) 8 (Design and Contingencies - $125,000) 9 (13) SR 1011, SR 1011 over Locust Creek, 10 Ryan Township, Bridge Rehabilitation 365,000 11 (Base Construction Allocation - 12 $180,000) 13 (Land Allocation - $60,000) 14 (Design and Contingencies - $125,000) 15 (14) SR 2018, SR 2018 over Little 16 Schuylkill River, Drehersville, East 17 Brunswick Township, Bridge 18 Rehabilitation 385,000 19 (Base Construction Allocation - 20 $285,000) 21 (Design and Contingencies - $100,000) 22 (15) SR 4013, SR 4013 over Rausch Creek, 23 Hegins Township, Bridge Rehabilitation 280,000 24 (Base Construction Allocation - 25 $180,000) 26 (Design and Contingencies - $100,000) 27 (16) SR 4022, SR 4022 over Tributary of 28 Mahantango Creek, Eldred Township, 29 Bridge Replacement 310,000 30 (Base Construction Allocation - 19970S0186B0179 - 245 -
1 $150,000) 2 (Land Allocation - $50,000) 3 (Design and Contingencies - $110,000) 4 (17) SR 0209, Broad Street over Little 5 Schuylkill River, Tamaqua Borough, 6 Bridge Replacement 600,000 7 (Base Construction Allocation - 8 $360,000) 9 (Land Allocation - $100,000) 10 (Design and Contingencies - $140,000) 11 (18) SR 4022, Broad Street Bridge over 12 Panther Creek, Tamaqua Borough, Bridge 13 Replacement 1,780,000 14 (Base Construction Allocation - 15 $1,220,000) 16 (Land Allocation - $195,000) 17 (Design and Contingencies - $365,000) 18 (19) SR 4022, SR 4022 over Mahanoy Creek, 19 Village of Helfenstein, Eldred 20 Township, Bridge Replacement 1,170,000 21 (Base Construction Allocation - 22 $750,000) 23 (Land Allocation - $195,000) 24 (Design and Contingencies - $225,000) 25 (20) SR 0339, SR 0339 over Catawissa 26 Creek, North Union Township, Bridge 27 Replacement 984,000 28 (Base Construction Allocation - 29 $630,000) 30 (Land Allocation - $165,000) 19970S0186B0179 - 246 -
1 (Design and Contingencies - $189,000) 2 (21) SR 0443, Dock Street Bridge over 3 Tributary of Schuylkill River, Borough 4 of Schuylkill Haven, Bridge 5 Replacement 325,000 6 (Base Construction Allocation - 7 $150,000) 8 (Land Allocation - $50,000) 9 (Design and Contingencies - $125,000) 10 (22) SR 0895, SR 0895 over Schuylkill 11 River, Bridge Replacement 2,370,000 12 (Base Construction Allocation - 13 $1,480,000) 14 (Land Allocation - $390,000) 15 (Design and Contingencies - $500,000) 16 (23) SR 4011, SR 4011 over Pine Creek, 17 Hegins Township, Bridge Replacement 720,000 18 (Base Construction Allocation - 19 $450,000) 20 (Land Allocation - $120,000) 21 (Design and Contingencies - $150,000) 22 (24) SR 0895, Auburn Arch over Schuylkill 23 River, South Manheim Township, Bridge 24 Replacement 550,000 25 (Base Construction Allocation - 26 $350,000) 27 (Land Allocation - $50,000) 28 (Design and Contingencies - $150,000) 29 Section 59. Snyder County. 30 (a) Local Bridges (Reserved) 19970S0186B0179 - 247 -
1 (b) State Bridges 2 (1) SR 1011, Pine Street Bridge over Penns 3 Creek, Selinsgrove, Bridge 4 Rehabilitation 1,150,000 5 (Base Construction Allocation - 6 $940,000) 7 (Land Allocation - $10,000) 8 (Design and Contingencies - $200,000) 9 (2) SR 3002, Bridge over Mahantango Creek, 10 1.5 Miles South of Meiserville, Perry 11 and Chapman Townships Line, Bridge 12 Rehabilitation 1,425,000 13 (Base Construction Allocation - 14 $1,211,000) 15 (Design and Contingencies - $214,000) 16 (3) SR 4007, Middle Creek Bridge over 17 Middle Creek, North of SR 0522 and 18 South of SR 4012, Bridge Replacement 1,158,000 19 (Base Construction Allocation - 20 $926,000) 21 (Land Allocation - $58,000) 22 (Design and Contingencies - $174,000) 23 (4) SR 0522, Bridge over Middle Creek, 24 Bridge Painting 180,000 25 (Base Construction Allocation - 26 $170,000) 27 (Design and Contingencies - $10,000) 28 (5) SR 0035, SR 0035 over Tributary of 29 Mahantango Creek, Perry Township, 30 Bridge Replacement 815,000 19970S0186B0179 - 248 -
1 (Base Construction Allocation - 2 $652,000) 3 (Land Allocation - $41,000) 4 (Design and Contingencies - $122,000) 5 (6) SR 0104, SR 0104 over Branch of 6 Mahantango Creek, Perry Township, 7 Bridge Replacement 430,000 8 (Base Construction Allocation - 9 $345,000) 10 (Land Allocation - $20,000) 11 (Design and Contingencies - $65,000) 12 (7) SR 0104, SR 0104 over Middle Creek, 13 Franklin Township, Bridge Replacement 440,000 14 (Base Construction Allocation - 15 $350,000) 16 (Land Allocation - $20,000) 17 (Design and Contingencies - $70,000) 18 (8) SR 0522, SR 0522 over Tributary of 19 Middle Creek, Spring Township, Bridge 20 Replacement 500,000 21 (Base Construction Allocation - 22 $400,000) 23 (Land Allocation - $25,000) 24 (Design and Contingencies - $75,000) 25 (9) SR 0522, SR 0522 over Tributary of 26 Middle Creek, Spring Township, Bridge 27 Replacement 896,000 28 (Base Construction Allocation - 29 $717,000) 30 (Land Allocation - $45,000) 19970S0186B0179 - 249 -
1 (Design and Contingencies - $134,000) 2 (10) SR 0522, SR 0522 over Tributary of 3 Middle Creek, Beavertown Borough, 4 Bridge Replacement 244,000 5 (Base Construction Allocation - 6 $195,000) 7 (Land Allocation - $12,000) 8 (Design and Contingencies - $37,000) 9 (11) SR 0522, SR 0522 over Tributary of 10 Middle Creek, Beavertown Borough, 11 Bridge Replacement 245,000 12 (Base Construction Allocation - 13 $196,000) 14 (Land Allocation - $12,000) 15 (Design and Contingencies - $37,000) 16 (12) SR 0522, SR 0522 over Kern Run, 17 Beavertown Borough, Bridge Replacement 570,000 18 (Base Construction Allocation - 19 $456,000) 20 (Land Allocation - $29,000) 21 (Design and Contingencies - $85,000) 22 (13) SR 0522, SR 0522 over Penns Creek, 23 Selinsgrove Borough, Bridge 24 Replacement 3,167,000 25 (Base Construction Allocation - 26 $2,534,000) 27 (Land Allocation - $158,000) 28 (Design and Contingencies - $475,000) 29 (14) SR 1011, SR 1011 over Tributary of 30 Penns Creek, Jackson Township, Bridge 19970S0186B0179 - 250 -
1 Replacement 241,000 2 (Base Construction Allocation - 3 $193,000) 4 (Land Allocation - $12,000) 5 (Design and Contingencies - $36,000) 6 (15) SR 2013, SR 2013 over Tributary of 7 Susquehanna River, Chapman Township, 8 Bridge Replacement 202,000 9 (Base Construction Allocation - 10 $162,000) 11 (Land Allocation - $10,000) 12 (Design and Contingencies - $30,000) 13 (16) SR 3009, SR 3009 over Paxtonville 14 Creek, Franklin Township, Bridge 15 Replacement 1,512,000 16 (Base Construction Allocation - 17 $1,209,000) 18 (Land Allocation - $76,000) 19 (Design and Contingencies - $227,000) 20 Section 60. Somerset County. 21 (a) Local Bridges 22 (1) Middlecreek Township, T-338, Blue Hole 23 Creek Bridge over Blue Hole Creek, 24 Bridge Replacement 505,000 25 (Base Construction Allocation - 26 $400,000) 27 (Land Allocation - $10,000) 28 (Design and Contingencies - $95,000) 29 (2) Paint Borough, Pennsylvania Railroad 30 Bridge over Bedford Street, Bridge 19970S0186B0179 - 251 -
1 Replacement 350,000 2 (Base Construction Allocation - 3 $250,000) 4 (Land Allocation - $25,000) 5 (Design and Contingencies - $75,000) 6 (3) Shade Township, T-712, Lipinski Road 7 Bridge over Dark Shade Creek, Bridge 8 Replacement 560,000 9 (Base Construction Allocation - 10 $450,000) 11 (Land Allocation - $10,000) 12 (Design and Contingencies - $100,000) 13 (4) Somerset Borough, Church Street Bridge 14 over Parsons Run, Bridge Replacement 350,000 15 (Base Construction Allocation - 16 $250,000) 17 (Land Allocation - $25,000) 18 (Design and Contingencies - $75,000) 19 (5) Windber Borough, South 22nd Street 20 Bridge over Seese Run, Bridge 21 Replacement 350,000 22 (Base Construction Allocation - 23 $250,000) 24 (Land Allocation - $25,000) 25 (Design and Contingencies - $75,000) 26 (6) Windber Borough, 24th Street Bridge 27 over Seese Run, Bridge Replacement 350,000 28 (Base Construction Allocation - 29 $250,000) 30 (Land Allocation - $25,000) 19970S0186B0179 - 252 -
1 (Design and Contingencies - $75,000) 2 (7) Windber Borough, Village Street Bridge 3 over Seese Run, Bridge Replacement 350,000 4 (Base Construction Allocation - 5 $250,000) 6 (Land Allocation - $25,000) 7 (Design and Contingencies - $75,000) 8 (8) Summit Township, Keystone Viaduct over 9 SR 2006, CSX Mainline and Flaugherty 10 Creek, Bridge Rehabilitation 715,000 11 (Base Construction Allocation - 12 $663,000) 13 (Design and Contingencies - $52,000) 14 (b) State Bridges 15 (1) SR 0160, SR 0160 over Tributary of 16 Boones Run, Stoney Creek Township, 17 Bridge Replacement 580,000 18 (Base Construction Allocation - 19 $430,000) 20 (Land Allocation - $25,000) 21 (Design and Contingencies - $125,000) 22 (2) SR 0523, SR 0523 over Whites Creek, 23 Addison Township, Bridge Replacement 690,000 24 (Base Construction Allocation - 25 $510,000) 26 (Land Allocation - $50,000) 27 (Design and Contingencies - $130,000) 28 (3) SR 1007, SR 1007 over Lambert Run, 29 Stoney Creek Township, Bridge 30 Replacement 490,000 19970S0186B0179 - 253 -
1 (Base Construction Allocation - 2 $355,000) 3 (Land Allocation - $25,000) 4 (Design and Contingencies - $110,000) 5 (4) SR 1017, SR 1017 over Breastwork Run, 6 Allegheny Township, Bridge Replacement 650,000 7 (Base Construction Allocation - 8 $490,000) 9 (Land Allocation - $25,000) 10 (Design and Contingencies - $135,000) 11 (5) SR 1017, SR 1017 over Breastwork Run, 12 Allegheny Township, Bridge Replacement 580,000 13 (Base Construction Allocation - 14 $440,000) 15 (Land Allocation - $25,000) 16 (Design and Contingencies - $135,000) 17 (6) SR 1018, SR 1018 over Beaverdam Run, 18 Shade Township, Bridge Replacement 545,000 19 (Base Construction Allocation - 20 $400,000) 21 (Land Allocation - $25,000) 22 (Design and Contingencies - $120,000) 23 (7) SR 1018, SR 1018 over Beaverdam Run, 24 Shade Township, Bridge Replacement 515,000 25 (Base Construction Allocation - 26 $375,000) 27 (Land Allocation - $25,000) 28 (Design and Contingencies - $115,000) 29 (8) SR 2005, SR 2005 over Elk Lick Creek, 30 Elk Lick Township, Bridge Replacement 520,000 19970S0186B0179 - 254 -
1 (Base Construction Allocation - 2 $380,000) 3 (Land Allocation - $25,000) 4 (Design and Contingencies - $115,000) 5 (9) SR 4013, SR 4013 over North Branch of 6 Quemahoning Creek, Lincoln Township, 7 Bridge Replacement 585,000 8 (Base Construction Allocation - 9 $435,000) 10 (Land Allocation - $25,000) 11 (Design and Contingencies - $125,000) 12 (10) SR 4019, SR 4019 over Quemahoning 13 Creek, Quemahoning Township, Bridge 14 Replacement 800,000 15 (Base Construction Allocation - 16 $625,000) 17 (Land Allocation - $25,000) 18 (Design and Contingencies - $150,000) 19 (11) SR 3039, SR 3039 over Allen Creek, 20 Middlecreek Township, Bridge 21 Replacement 200,000 22 (Base Construction Allocation - 23 $150,000) 24 (Land Allocation - $5,000) 25 (Design and Contingencies - $45,000) 26 (12) SR 3039, SR 3039 over Allen Creek, 27 Middlecreek Township, Bridge 28 Replacement 220,000 29 (Base Construction Allocation - 30 $150,000) 19970S0186B0179 - 255 -
1 (Land Allocation - $10,000) 2 (Design and Contingencies - $60,000) 3 (13) SR 4001, SR 4001 over Clear Run, 4 Jefferson Township, Bridge Replacement 295,000 5 (Base Construction Allocation - 6 $200,000) 7 (Land Allocation - $10,000) 8 (Design and Contingencies - $85,000) 9 Section 61. Sullivan County. 10 (a) Local Bridges 11 (1) Forks Township, T-448, Old TR 87 12 Bridge, County Bridge No.55 over Little 13 Loyalsock Creek, Bridge Replacement 860,000 14 (Base Construction Allocation - 15 $700,000) 16 (Land Allocation - $10,000) 17 (Design and Contingencies - $150,000) 18 (2) Forks and Laporte Townships, T-346 19 over Loyalsock Creek, Bridge 20 Replacement 840,000 21 (Base Construction Allocation - 22 $730,000) 23 (Land Allocation - $10,000) 24 (Design and Contingencies - $100,000) 25 (b) State Bridges 26 (1) SR 0087, SR 0087 over Lick Run, Forks 27 Township, Bridge Replacement 635,000 28 (Base Construction Allocation - 29 $508,000) 30 (Land Allocation - $32,000) 19970S0186B0179 - 256 -
1 (Design and Contingencies - $95,000) 2 (2) SR 0087, SR 0087 over Little Loyalsock 3 Creek, Cherry Township, Bridge 4 Replacement 655,000 5 (Base Construction Allocation - 6 $524,000) 7 (Land Allocation - $33,000) 8 (Design and Contingencies - $98,000) 9 (3) SR 0154, SR 0154 over Black Water Run, 10 Elkland Township, Bridge Replacement 194,000 11 (Base Construction Allocation - 12 $166,000) 13 (Design and Contingencies - $28,000) 14 (4) SR 0154, SR 0154 over Kings Creek, 15 Elkland Township, Bridge Replacement 404,000 16 (Base Construction Allocation - 17 $323,000) 18 (Land Allocation - $20,000) 19 (Design and Contingencies - $61,000) 20 (5) SR 1012, SR 1012 over Little Loyalsock 21 Creek, Cherry Township, Bridge 22 Replacement 260,000 23 (Base Construction Allocation - 24 $208,000) 25 (Land Allocation - $13,000) 26 (Design and Contingencies - $39,000) 27 Section 62. Susquehanna County. 28 (a) Local Bridges (Reserved) 29 (b) State Bridges 30 (1) SR 0167, Owego Street Bridge over 19970S0186B0179 - 257 -
1 Branch of Fall Brook, Bridgewater 2 Township, Bridge Replacement 413,000 3 (Base Construction Allocation - 4 $342,000) 5 (Land Allocation - $10,000) 6 (Design and Contingencies - $61,000) 7 (2) SR 1016, Salt Lick Creek Bridge over 8 Branch of Salt Lick Creek, New Milford 9 Township, Bridge Replacement 100,000 10 (Base Construction Allocation - 11 $86,000) 12 (Land Allocation - $3,000) 13 (Design and Contingencies - $11,000) 14 (3) SR 0081, Bridge over Trowbridge Creek, 15 1 Mile South of the Pennsylvania and 16 New York State Line, Great Bend 17 Township, Bridge Replacement 890,000 18 (Base Construction Allocation - 19 $700,000) 20 (Land Allocation - $10,000) 21 (Design and Contingencies - $180,000) 22 (4) SR 1017, Gulf Street Bridge, 0.5 Mile 23 North of SR 1015, Lanesboro Borough, 24 Bridge Replacement 305,000 25 (Base Construction Allocation - 26 $220,000) 27 (Land Allocation - $10,000) 28 (Design and Contingencies - $75,000) 29 (5) SR 3003, Bridge over Transue Creek, 30 1.5 Miles South of SR 3005, Auburn 19970S0186B0179 - 258 -
1 Township, Bridge Painting 60,000 2 (Base Construction Allocation - 3 $50,000) 4 (Design and Contingencies - $10,000) 5 (6) SR 3006, Bridge over White Creek, 1.5 6 Miles West of SR 3004, Springville 7 Township, Bridge Painting 70,000 8 (Base Construction Allocation - 9 $60,000) 10 (Design and Contingencies - $10,000) 11 (7) SR 0011, Bridge over Salt Lick Creek, 12 0.6 Mile North of TR 492, New Milford 13 Borough, Bridge Replacement 660,000 14 (Base Construction Allocation - 15 $510,000) 16 (Land Allocation - $20,000) 17 (Design and Contingencies - $130,000) 18 (8) SR 0367, Bridge over Tuscarora Creek, 19 North of SR 3005, Auburn Township, 20 Bridge Replacement 330,000 21 (Base Construction Allocation - 22 $265,000) 23 (Land Allocation - $10,000) 24 (Design and Contingencies - $65,000) 25 (9) SR 1010, Bridge over Bedbug Creek, 26 West of SR 1021, Oakland Township, 27 Bridge Replacement 325,000 28 (Base Construction Allocation - 29 $250,000) 30 (Land Allocation - $10,000) 19970S0186B0179 - 259 -
1 (Design and Contingencies - $65,000) 2 (10) SR 1010, Bridge over Tributary of 3 Susquehanna River, 2 Miles West of SR 4 1021, Great Bend Township, Bridge 5 Replacement 288,000 6 (Base Construction Allocation - 7 $220,000) 8 (Land Allocation - $10,000) 9 (Design and Contingencies - $58,000) 10 (11) SR 2046, Bridge over Branch of 11 Tunkhannock Creek, East of TR 92, 12 Gibson Township, Bridge Replacement 513,000 13 (Base Construction Allocation - 14 $400,000) 15 (Land Allocation - $10,000) 16 (Design and Contingencies - $103,000) 17 (12) SR 3017, Bridge over Thomas Creek, 18 Southeast of TR 29, Springville 19 Township, Bridge Replacement 285,000 20 (Base Construction Allocation - 21 $220,000) 22 (Land Allocation - $10,000) 23 (Design and Contingencies - $50,000) 24 (13) State Bridges, Countywide Bridge Zone 25 Painting, Bridge Painting 370,000 26 (Base Construction Allocation - 27 $350,000) 28 (Land Allocation - $10,000) 29 (Design and Contingencies - $10,000) 30 (14) SR 0858, Branch of Apolacon Creek, 19970S0186B0179 - 260 -
1 0.3 Mile North of SR 4013, Apolacon 2 Township, Bridge Replacement 220,000 3 (Base Construction Allocation - 4 $180,000) 5 (Land Allocation - $10,000) 6 (Design and Contingencies - $30,000) 7 (15) SR 1010, SR 1010 over Tributary of 8 Susquehanna River, Great Bend Township, 9 Bridge Replacement 230,000 10 (Base Construction Allocation - 11 $190,000) 12 (Land Allocation - $10,000) 13 (Design and Contingencies - $30,000) 14 (16) SR 1010, SR 1010 over Bedbug Creek, 15 Oakland Township, Bridge Replacement 270,000 16 (Base Construction Allocation - 17 $220,000) 18 (Land Allocation - $10,000) 19 (Design and Contingencies - $40,000) 20 (17) SR 2046, SR 2046 over Tunkhannock 21 Creek, Gibson Township, Bridge 22 Replacement 440,000 23 (Base Construction Allocation - 24 $370,000) 25 (Land Allocation - $10,000) 26 (Design and Contingencies - $60,000) 27 Section 63. Tioga County. 28 (a) Local Bridges 29 (1) Elkland Borough, North Buffalo Street 30 over Camp Brook Creek, Bridge 19970S0186B0179 - 261 -
1 Replacement 510,000 2 (Base Construction Allocation) - 3 $360,000) 4 (Land Allocation - $20,000) 5 (Design and Contingencies - $130,000) 6 (b) State Bridges 7 (1) SR 0249, Losey Creek Bridge, South of 8 SR 4017 in Village of Keeneyville, 9 Middlebury Township, Bridge 10 Rehabilitation 250,000 11 (Base Construction Allocation - 12 $210,000) 13 (Land Allocation - $5,000) 14 (Design and Contingencies - $35,000) 15 (2) SR 1002, Corey Creek Bridge over Corey 16 Creek, Northeast of Mansfield, Bridge 17 Replacement 346,000 18 (Base Construction Allocation - 19 $277,000) 20 (Land Allocation - $17,000) 21 (Design and Contingencies - $52,000) 22 (3) SR 3001, Kettle Creek Bridge, 11 Miles 23 South of Watrous, Bridge Replacement 366,000 24 (Base Construction Allocation - 25 $293,000) 26 (Land Allocation - $18,000) 27 (Design and Contingencies - $55,000) 28 (4) SR 3023, Heise Run North Bridge, West 29 of Wellsboro, Bridge Replacement 240,000 30 (Base Construction Allocation - 19970S0186B0179 - 262 -
1 $192,000) 2 (Land Allocation - $12,000) 3 (Design and Contingencies - $36,000) 4 (5) SR 4017, Holden Creek Bridge No.1, 5 Bridge Replacement 584,000 6 (Base Construction Allocation - 7 $467,000) 8 (Land Allocation - $29,000) 9 (Design and Contingencies - $88,000) 10 (6) SR 4024, Elkhorn Creek Bridge, West of 11 Tioga Borough, Bridge Replacement 451,000 12 (Base Construction Allocation - 13 $401,000) 14 (Land Allocation - $15,000) 15 (Design and Contingencies - $35,000) 16 (7) SR 3007, Bridge over Stoney Fork 17 Creek, Bridge Painting 160,000 18 (Base Construction Allocation - 19 $150,000) 20 (Design and Contingencies - $10,000) 21 (8) SR 4017, Bridge over Cowanesque River, 22 Bridge Painting 475,000 23 (Base Construction Allocation - 24 $465,000) 25 (Design and Contingencies - $10,000) 26 (9) SR 0049, SR 0049 over Cowanesque 27 River, Westfield Township, Bridge 28 Replacement 1,802,000 29 (Base Construction Allocation - 30 $1,442,000) 19970S0186B0179 - 263 -
1 (Land Allocation - $90,000) 2 (Design and Contingencies - $270,000) 3 (10) SR 0287, SR 0287 over Wellsboro 4 Street - Conrail, Tioga Township, 5 Bridge Replacement 1,709,000 6 (Base Construction Allocation - 7 $1,367,000) 8 (Land Allocation - $86,000) 9 (Design and Contingencies - $256,000) 10 (11) SR 0328, SR 0328 over Hammond Creek, 11 Jackson Township, Bridge Replacement 256,000 12 (Base Construction Allocation - 13 $205,000) 14 (Land Allocation - $13,000) 15 (Design and Contingencies - $38,000) 16 (12) SR 0349, SR 0349 over Mill Creek, 17 Clymer Township, Bridge Replacement 1,000,000 18 (Base Construction Allocation - 19 $800,000) 20 (Land Allocation - $50,000) 21 (Design and Contingencies - $150,000) 22 (13) SR 1030, SR 1030 over Conrail, Tioga 23 Township, Bridge Replacement 561,000 24 (Base Construction Allocation - 25 $449,000) 26 (Land Allocation - $28,000) 27 (Design and Contingencies - $84,000) 28 (14) SR 2017, SR 2017 over Mill Creek, 29 Union Township, Bridge Replacement 584,000 30 (Base Construction Allocation - 19970S0186B0179 - 264 -
1 $467,000) 2 (Land Allocation - $27,000) 3 (Design and Contingencies - $88,000) 4 (15) SR 4017, SR 4017 Bridge No.2 over 5 Holden Creek, Osceola Township, Bridge 6 Replacement 542,000 7 (Base Construction Allocation - 8 $434,000) 9 (Land Allocation - $27,000) 10 (Design and Contingencies - $81,000) 11 Section 64. Union County. 12 (a) Local Bridges (Reserved) 13 (b) State Bridges 14 (1) SR 0192, Rapid Run Bridge II over 15 Rapid Run, Lewis Township, Bridge 16 Rehabilitation 250,000 17 (Base Construction Allocation - 18 $200,000) 19 (Land Allocation - $13,000) 20 (Design and Contingencies - $37,000) 21 (2) SR 0192, Rapid Run Bridge I over Rapid 22 Run, Lewis Township, Bridge 23 Rehabilitation 205,000 24 (Base Construction Allocation - 25 $164,000) 26 (Land Allocation - $10,000) 27 (Design and Contingencies - $31,000) 28 (3) SR 0044, Bridge over Spring Creek, 29 Bridge Painting 110,000 30 (Base Construction Allocation - 19970S0186B0179 - 265 -
1 $100,000) 2 (Design and Contingencies - $10,000) 3 (4) SR 1004, Bridge over Little Buffalo 4 Creek, Bridge Painting 75,000 5 (Base Construction Allocation - 6 $65,000) 7 (Design and Contingencies - $10,000) 8 (5) SR 1012, Bridge over White Deer Hole 9 Creek, Bridge Painting 160,000 10 (Base Construction Allocation - 11 $150,000) 12 (Design and Contingencies - $10,000) 13 (6) SR 0235, SR 0235 over Laurel Run, 14 Hartley Township, Bridge Replacement 1,118,000 15 (Base Construction Allocation - 16 $894,000) 17 (Land Allocation - $56,000) 18 (Design and Contingencies - $168,000) 19 (7) SR 0235, SR 0235 over Buffalo Creek, 20 Lewis Township, Bridge Replacement 395,000 21 (Base Construction Allocation - 22 $316,000) 23 (Land Allocation - $20,000) 24 (Design and Contingencies - $59,000) 25 Section 65. Venango County. 26 (a) Local Bridges 27 (1) Richland Township, T-552 over Mill 28 Creek, Bridge Replacement 475,000 29 (Base Construction Allocation - 30 $355,000) 19970S0186B0179 - 266 -
1 (Land Allocation - $10,000) 2 (Design and Contingencies - $110,000) 3 (2) Richland Township, T-361 over unnamed 4 tributary of Mill Creek, Bridge 5 Replacement 337,000 6 (Base Construction Allocation - 7 $242,000) 8 (Land Allocation - $10,000) 9 (Design and Contingencies - $85,000) 10 (3) Richland Township, T-377 over Sage 11 Run, Bridge Replacement 385,000 12 (Base Construction Allocation - 13 $290,000) 14 (Land Allocation - $10,000) 15 (Design and Contingencies - $85,000) 16 (4) Pinegrove Township, T-628 over East 17 Sandy Creek, Bridge Replacement 363,000 18 (Base Construction Allocation - 19 $307,000) 20 (Land Allocation - $6,000) 21 (Design and Contingencies - $50,000) 22 (5) Cranberry Township, T-679 over Branch 23 of Sage Run, Bridge Replacement 106,000 24 (Base Construction Allocation - 25 $100,000) 26 (Land Allocation - $1,000) 27 (Design and Contingencies - $5,000) 28 (6) Oakland Township, T-567 over Branch of 29 Two Mile Run, Bridge Replacement 106,000 30 (Base Construction Allocation - 19970S0186B0179 - 267 -
1 $100,000) 2 (Land Allocation - $1,000) 3 (Design and Contingencies - $5,000) 4 (7) Rockland Township, T-512 over East 5 Sandy Creek, Bridge Replacement 360,000 6 (Base Construction Allocation - 7 $300,000) 8 (Land Allocation - $10,000) 9 (Design and Contingencies - $50,000) 10 (8) Pinegrove Township, T-628 over East 11 Sandy Creek, Bridge Replacement 510,000 12 (Base Construction Allocation - 13 $400,000) 14 (Land Allocation - $10,000) 15 (Design and Contingencies - $100,000) 16 (b) State Bridges 17 (1) SR 4001, SR 4001 over Two Mile Run 18 West Branch, Sugarcreek Borough, Bridge 19 Replacement 205,000 20 (Base Construction Allocation - 21 $150,000) 22 (Land Allocation - $5,000) 23 (Design and Contingencies - $50,000) 24 (2) SR 0227, SR 0227 over Cherry Run, 25 Cornplanter Township, Bridge 26 Replacement 280,000 27 (Base Construction Allocation - 28 $200,000) 29 (Land Allocation - $20,000) 30 (Design and Contingencies - $60,000) 19970S0186B0179 - 268 -
1 (3) SR 0322, SR 0322 over Halls Run, 2 Cranberry Township, Bridge Replacement 2,600,000 3 (Base Construction Allocation - 4 $2,000,000) 5 (Land Allocation - $100,000) 6 (Design and Contingencies - $500,000) 7 (4) SR 3009, SR 3009 over I-80, Scrubgrass 8 Township, Bridge Replacement 810,000 9 (Base Construction Allocation - 10 $700,000) 11 (Land Allocation - $10,000) 12 (Design and Contingencies - $100,000) 13 (5) SR 3017, SR 3017 over Warden Run, 14 Canal Township, Bridge Replacement 920,000 15 (Base Construction Allocation - 16 $800,000) 17 (Land Allocation - $20,000) 18 (Design and Contingencies - $100,000) 19 (6) SR 0038, SR 0038 over Pine Run, 20 Richland Township, Bridge 21 Rehabilitation 110,000 22 (Base Construction Allocation - 23 $100,000) 24 (Design and Contingencies - $10,000) 25 (7) SR 3025, SR 3025 over Hays Run, City 26 of Oil City, Bridge Replacement 340,000 27 (Base Construction Allocation - 28 $300,000) 29 (Land Allocation - $5,000) 30 (Design and Contingencies - $35,000) 19970S0186B0179 - 269 -
1 Section 66. Warren County. 2 (a) Local Bridges (Reserved) 3 (b) State Bridges 4 (1) SR 0006, SR 0006 over Wintroth Run, 5 Brokenstraw Township, Bridge 6 Replacement 260,000 7 (Base Construction Allocation - 8 $180,000) 9 (Land Allocation - $20,000) 10 (Design and Contingencies - $60,000) 11 (2) SR 0006, SR 0006 over Six Mile Run, 12 Mead Township, Bridge Replacement 320,000 13 (Base Construction Allocation - 14 $250,000) 15 (Land Allocation - $10,000) 16 (Design and Contingencies - $60,000) 17 (3) SR 0027, SR 0027 over Pine Creek, 18 Southwest Township, Bridge Replacement 800,000 19 (Base Construction Allocation - 20 $580,000) 21 (Land Allocation - $20,000) 22 (Design and Contingencies - $200,000) 23 (4) SR 0027, SR 0027 over Hazeltine Hollow 24 Run, Brokenstraw Township, Bridge 25 Replacement 310,000 26 (Base Construction Allocation - 27 $210,000) 28 (Land Allocation - $20,000) 29 (Design and Contingencies - $80,000) 30 (5) SR 0062, SR 0062 over Bully Run, 19970S0186B0179 - 270 -
1 Watson Township, Bridge Replacement 300,000 2 (Base Construction Allocation - 3 $230,000) 4 (Land Allocation - $20,000) 5 (Design and Contingencies - $50,000) 6 (6) SR 0957, SR 0957 over Little 7 Brokenstraw Creek, Freehold Township, 8 Bridge Replacement 800,000 9 (Base Construction Allocation - 10 $620,000) 11 (Land Allocation - $20,000) 12 (Design and Contingencies - $160,000) 13 (7) SR 3009, SR 3009 over Tidioute Creek, 14 Deerfield Township, Bridge Replacement 470,000 15 (Base Construction Allocation - 16 $400,000) 17 (Land Allocation - $10,000) 18 (Design and Contingencies - $60,000) 19 (8) SR 4013, SR 4013 over Mathews Run, 20 Youngsville Borough, Bridge 21 Replacement 430,000 22 (Base Construction Allocation - 23 $360,000) 24 (Land Allocation - $10,000) 25 (Design and Contingencies - $60,000) 26 (9) SR 4021, SR 4021 over Brands Run, 27 Sugar Grove Borough, Bridge 28 Replacement 240,000 29 (Base Construction Allocation - 30 $180,000) 19970S0186B0179 - 271 -
1 (Land Allocation - $20,000) 2 (Design and Contingencies - $40,000) 3 Section 67. Washington County. 4 (a) Local Bridges 5 (1) Burgettstown Borough, Raccoon Bridge 6 No.23 over Raccoon Creek, Bridge 7 Rehabilitation 433,000 8 (Base Construction Allocation - 9 $313,000) 10 (Land Allocation - $20,000) 11 (Design and Contingencies - $100,000) 12 (2) Chartiers Township, Allison Hollow 13 Road, One-Lane Bridge, Bridge 14 Replacement 195,000 15 (Base Construction Allocation - 16 $150,000) 17 (Land Allocation - $5,000) 18 (Design and Contingencies - $40,000) 19 (3) Chartiers Township, Allison Hollow 20 Road, One-Lane Bridge, Bridge 21 Replacement 195,000 22 (Base Construction Allocation - 23 $150,000) 24 (Land Allocation - $5,000) 25 (Design and Contingencies - $40,000) 26 (4) Chartiers Township, McGovern Road 27 Bridge, Bridge Replacement 145,000 28 (Base Construction Allocation - 29 $100,000) 30 (Land Allocation - $5,000) 19970S0186B0179 - 272 -
1 (Design and Contingencies - $40,000) 2 (5) North Strabane Township, T-643, Galley 3 Road Bridge over Little Chartiers 4 Creek, Bridge Replacement 570,000 5 (Base Construction Allocation - 6 $450,000) 7 (Land Allocation - $20,000) 8 (Design and Contingencies - $100,000) 9 (6) Donegal Township, T-541, Lindsay 10 Bridge over Buck Run, Bridge 11 Replacement 285,000 12 (Base Construction Allocation - 13 $255,000) 14 (Design and Contingencies - $30,000) 15 (7) Donegal Township, T-423, Mays Bridge 16 over Middle Wheeling Creek, Bridge 17 Replacement 245,000 18 (Base Construction Allocation - 19 $215,000) 20 (Design and Contingencies - $30,000) 21 (8) Independence Township, T-649, Cummins 22 Bridge over Sugar Camp Run, Bridge 23 Replacement 330,000 24 (Base Construction Allocation - 25 $300,000) 26 (Design and Contingencies - $30,000) 27 (9) Mount Pleasant Township, T-749, Sabo 28 Road over Westland Run, Bridge 29 Replacement 25,000 30 (Base Construction Allocation - 19970S0186B0179 - 273 -
1 $20,000) 2 (Design and Contingencies - $5,000) 3 (10) Mount Pleasant Township, T-606, 4 Primrose Road over Millers Run, Bridge 5 Replacement 25,000 6 (Base Construction Allocation - 7 $20,000) 8 (Design and Contingencies - $5,000) 9 (11) Mount Pleasant Township, T-493, 10 Meriage Street over Robinson Run 11 Tributary, Bridge Replacement 25,000 12 (Base Construction Allocation - 13 $20,000) 14 (Design and Contingencies - $5,000) 15 (12) North Bethlehem Township, T-445, 16 Dague Bridge over Pigeon Creek, Bridge 17 Replacement 250,000 18 (Base Construction Allocation - 19 $220,000) 20 (Design and Contingencies - $30,000) 21 (13) North Franklin Township, T-526, Cario 22 Drive over Unnamed Tributary of Catfish 23 Creek, Bridge Replacement 46,000 24 (Base Construction Allocation - 25 $42,000) 26 (Design and Contingencies - $4,000) 27 (14) Nottingham Township, T-782, Sundust 28 Road Culvert, 35 Feet North of 29 Intersection with SR 1059, Bridge 30 Replacement 101,000 19970S0186B0179 - 274 -
1 (Base Construction Allocation - 2 $91,000) 3 (Design and Contingencies - $10,000) 4 (15) Nottingham Township, T-828, Barr 5 Bridge over Mingo Creek, Bridge 6 Replacement 350,000 7 (Base Construction Allocation - 8 $310,000) 9 (Design and Contingencies - $40,000) 10 (16) Robinson Township, T-500, Chamberlain 11 Bridge over Chamberlain Run, Bridge 12 Replacement 285,000 13 (Base Construction Allocation - 14 $255,000) 15 (Design and Contingencies - $30,000) 16 (17) Smith Township, T-843, Dunbar Bridge 17 over Raccoon Creek, Bridge Replacement 285,000 18 (Base Construction Allocation - 19 $255,000) 20 (Design and Contingencies - $30,000) 21 (18) City of Washington, Hanna Street 22 Bridge over Catfish Creek, Bridge 23 Replacement 40,000 24 (Base Construction Allocation - 25 $30,000) 26 (Design and Contingencies - $10,000) 27 (19) City of Washington, Rosewood Avenue 28 Bridge over Catfish Creek, Bridge 29 Replacement 40,000 30 (Base Construction Allocation - 19970S0186B0179 - 275 -
1 $30,000) 2 (Design and Contingencies - $10,000) 3 (20) West Pike Run Township, T-840, Suzy 4 Lane over Pike Run Creek, Bridge 5 Replacement 230,000 6 (Base Construction Allocation - 7 $210,000) 8 (Design and Contingencies - $20,000) 9 (21) California Borough, Daisytown Bridge 10 over Pike Run, Bridge Replacement 925,000 11 (Base Construction Allocation - 12 $700,000) 13 (Land Allocation - $50,000) 14 (Design and Contingencies - $175,000) 15 (22) Coal Center Borough, Water Street 16 Bridge over Pike Run, Bridge 17 Replacement 1,588,000 18 (Base Construction Allocation - 19 $1,288,000) 20 (Land Allocation - $50,000) 21 (Design and Contingencies - $250,000) 22 (23) West Pike Run Township, T-948 over 23 Pike Run, Bridge Replacement 1,075,000 24 (Base Construction Allocation - 25 $850,000) 26 (Land Allocation - $50,0000) 27 (Design and Contingencies - $175,000) 28 (24) Midway Borough, North Avenue over 29 Robinson Run Creek, Bridge Replacement 95,000 30 (Base Construction Allocation - 19970S0186B0179 - 276 -
1 $55,000) 2 (Land Allocation - $20,000) 3 (Design and Contingencies - $20,000) 4 (25) Canonsburg Borough, Adams Street over 5 Brush Run, Bridge Replacement 176,000 6 (Base Construction Allocation - 7 $150,000) 8 (Land Allocation - $1,000) 9 (Design and Contingencies - $25,000) 10 (26) East Finley Township, T-375, County 11 Bridge No. 32 over Templeton Fork, 12 Bridge Replacement 355,000 13 (Base Construction Allocation - 14 $300,000) 15 (Land Allocation - $5,000) 16 (Design and Contingencies - $50,000) 17 (b) State Bridges 18 (1) SR 0018, Bridge over Abandoned 19 Railroad, City of Washington, Bridge 20 Replacement 650,000 21 (Base Construction Allocation - 22 $500,000) 23 (Land Allocation - $25,000) 24 (Design and Contingencies - $125,000) 25 (2) SR 0019, Bridge over Chartiers Creek, 26 North Strabane and Peters Townships, 27 Bridge Painting 161,000 28 (Base Construction Allocation - 29 $156,000) 30 (Design and Contingencies - $5,000) 19970S0186B0179 - 277 -
1 (3) SR 0070, I-70 Westbound Bridge over SR 2 3009, Buffalo Township, Bridge 3 Painting 148,000 4 (Base Construction Allocation - 5 $143,000) 6 (Design and Contingencies - $5,000) 7 (4) SR 0070, I-70 Eastbound Bridge over SR 8 3009, Buffalo Township, Bridge 9 Painting 163,000 10 (Base Construction Allocation - 11 $158,000) 12 (Design and Contingencies - $5,000) 13 (5) SR 0070, I-70 Bridge over 8th Street, 14 Donegal Township, Bridge Replacement 2,486,000 15 (Base Construction Allocation - 16 $2,211,000) 17 (Land Allocation - $25,000) 18 (Design and Contingencies - $250,000) 19 (6) SR 0070, I-70 Bridge over Turnback 20 Road, South Strabane Township, Bridge 21 Rehabilitation 990,000 22 (Base Construction Allocation - 23 $750,000) 24 (Land Allocation - $40,000) 25 (Design and Contingencies - $200,000) 26 (7) SR 0070, I-70 Bridge over SR 0519, 27 Somerset Township, Bridge 28 Rehabilitation 2,000,000 29 (Base Construction Allocation - 30 $1,720,000) 19970S0186B0179 - 278 -
1 (Land Allocation - $40,000) 2 (Design and Contingencies - $240,000) 3 (8) SR 0070, I-70 Bridge over SR 2017, 4 Somerset Township, Bridge 5 Rehabilitation 1,105,000 6 (Base Construction Allocation - 7 $865,000) 8 (Land Allocation - $40,000) 9 (Design and Contingencies - $200,000) 10 (9) SR 0088, Charleroi Bridge over Maple 11 Creek, Charleroi and Speers Boroughs, 12 Bridge Replacement 725,000 13 (Base Construction Allocation - 14 $500,000) 15 (Land Allocation - $25,000) 16 (Design and Contingencies - $200,000) 17 (10) SR 0088, Bridge over Peters Creek, 18 Finleyville Borough, Bridge Painting 65,000 19 (Base Construction Allocation - 20 $65,000) 21 (11) SR 0917, Pigeon Creek Bridge over 22 Branch of Pigeon Creek, Bentleyville 23 Borough, Bridge Replacement 570,000 24 (Base Construction Allocation - 25 $370,000) 26 (Land Allocation - $25,000) 27 (Design and Contingencies - $175,000) 28 (12) SR 1005, Bridge over Millers Run, 29 Cecil Township, Bridge Painting 75,000 30 (Base Construction Allocation - 19970S0186B0179 - 279 -
1 $75,000) 2 (13) SR 1022, Donora Webster Bridge over 3 Monongahela River and Conrail, Donora 4 Borough, Bridge Replacement 20,000,000 5 (Base Construction Allocation - 6 $15,000,000) 7 (Land Allocation - $3,000,000) 8 (Design and Contingencies - $2,000,000) 9 (14) SR 1077, Donora-Monessen Bridge over 10 Monongahela River, PA 837 and 906 and 11 Railroad, Donora Borough, Bridge 12 Painting 1,000,000 13 (Base Construction Allocation - 14 $1,000,000) 15 (15) SR 2005, Sowers Run Bridge over 16 Sowers Run, Amwell Township, Bridge 17 Replacement 435,000 18 (Base Construction Allocation - 19 $235,000) 20 (Land Allocation - $25,000) 21 (Design and Contingencies - $175,000) 22 (16) SR 2011, Bridge over Branch of Little 23 Tenmile Creek, West Bethlehem Township, 24 Bridge Replacement 460,000 25 (Base Construction Allocation - 26 $260,000) 27 (Land Allocation - $25,000) 28 (Design and Contingencies - $175,000) 29 (17) SR 2030, Gorby's Bridge II over Gorby 30 Run, California Borough, Bridge 19970S0186B0179 - 280 -
1 Rehabilitation 300,000 2 (Base Construction Allocation - 3 $300,000) 4 (18) SR 2037, Maple Creek Bridge over 5 Branch of Maple Creek, Fallowfield 6 Township, Bridge Replacement 486,000 7 (Base Construction Allocation - 8 $286,000) 9 (Land Allocation - $25,000) 10 (Design and Contingencies - $175,000) 11 (19) SR 3009, Buffalo Arch Bridge over 12 Branch of Buffalo Creek and Railroad, 13 Buffalo Township, Bridge Replacement 535,000 14 (Base Construction Allocation - 15 $300,000) 16 (Land Allocation - $10,000) 17 (Design and Contingencies - $225,000) 18 (20) SR 4015, Bridge over Cherry Run, 19 Mount Pleasant Township, Bridge 20 Painting 53,000 21 (Base Construction Allocation - 22 $51,000) 23 (Design and Contingencies - $2,000) 24 (21) SR 4022, Chartiers Creek Bridge No.2 25 over Branch of Chartiers Creek, Canton 26 Township, Bridge Replacement 415,000 27 (Base Construction Allocation - 28 $215,000) 29 (Land Allocation - $25,000) 30 (Design and Contingencies - $175,000) 19970S0186B0179 - 281 -
1 (22) SR 4022, Chartiers Creek Bridge No.1 2 over Branch of Chartiers Creek, Canton 3 Township, Bridge Replacement 405,000 4 (Base Construction Allocation - 5 $205,000) 6 (Land Allocation - $25,000) 7 (Design and Contingencies - $175,000) 8 (23) SR 2034, SR 2034 over Branch of Pike 9 Run, West Pike Run Township, Bridge 10 Replacement 438,000 11 (Base Construction Allocation - 12 $313,000) 13 (Land Allocation - $25,000) 14 (Design and Contingencies - $100,000) 15 (24) SR 2079, SR 2079 over Pike Run, West 16 Pike Run Township, Bridge Replacement 988,000 17 (Base Construction Allocation - 18 $788,000) 19 (Land Allocation - $50,000) 20 (Design and Contingencies - $150,000) 21 Section 68. Wayne County. 22 (a) Local Bridges (Reserved) 23 (b) State Bridges 24 (1) SR 0371, Cochecton Bridge No.6 over 25 Delaware River, Damascus Township, 26 Bridge Rehabilitation 1,050,000 27 (Base Construction Allocation - 28 $950,000) 29 (Design and Contingencies - $100,000) 30 (2) SR 0380, I-380 Bridge over Lehigh 19970S0186B0179 - 282 -
1 River, Lehigh Township, Bridge 2 Rehabilitation 284,000 3 (Base Construction Allocation - 4 $244,000) 5 (Design and Contingencies - $40,000) 6 (3) SR 4009, Quarry Bridge over Dyberry 7 Creek, Dyberry Township, Bridge 8 Replacement 660,000 9 (Base Construction Allocation - 10 $500,000) 11 (Land Allocation - $10,000) 12 (Design and Contingencies - $150,000) 13 (4) SR 0371, Bridge No.6, Damascus 14 Township, Bridge Painting 2,200,000 15 (Base Construction Allocation - 16 $2,000,000) 17 (Design and Contingencies - $200,000) 18 (5) SR 1020, Bridge No.7 over Delaware 19 River, Damascus Township, Bridge 20 Painting 3,300,000 21 (Base Construction Allocation - 22 $3,000,000) 23 (Design and Contingencies - $300,000) 24 (6) SR 1004, Bridge over Outlet of Beach 25 Lake, Intersection of SR 1011, Berlin 26 Township, Bridge Replacement 345,000 27 (Base Construction Allocation - 28 $265,000) 29 (Land Allocation - $10,000) 30 (Design and Contingencies - $70,000) 19970S0186B0179 - 283 -
1 (7) SR 3028, Bridge over TR 191, East of 2 SR 3031, Cherry Ridge Township, Bridge 3 Replacement 450,000 4 (Base Construction Allocation - 5 $350,000) 6 (Land Allocation - $10,000) 7 (Design and Contingencies - $90,000) 8 (8) State Bridges, Countywide Bridge Zone 9 Painting, Bridge Painting 370,000 10 (Base Construction Allocation - 11 $350,000) 12 (Land Allocation - $10,000) 13 (Design and Contingencies - $10,000) 14 (9) SR 1004, SR 1004 over Outlet of Beach 15 Lake, Berlin Township, Bridge 16 Replacement 260,000 17 (Base Construction Allocation - 18 $220,000) 19 (Land Allocation - $10,000) 20 (Design and Contingencies - $30,000) 21 (10) SR 3028, SR 3028 over TR 191, Cherry 22 Ridge Township, Bridge Replacement 400,000 23 (Base Construction Allocation - 24 $340,000) 25 (Land Allocation - $10,000) 26 (Design and Contingencies - $50,000) 27 Section 69. Westmoreland County. 28 (a) Local Bridges 29 (1) Hempfield Township, Airport Hill Road 30 Bridge over Slate Creek, Bridge 19970S0186B0179 - 284 -
1 Replacement 350,000 2 (Base Construction Allocation - 3 $280,000) 4 (Land Allocation - $10,000) 5 (Design and Contingencies - $60,000) 6 (2) Hempfield Township, Sweitzer Road 7 Bridge over Sewickley Creek, Bridge 8 Replacement 975,000 9 (Base Construction Allocation - 10 $800,000) 11 (Land Allocation - $15,000) 12 (Design and Contingencies - $160,000) 13 (3) Hempfield Township, Ladysmith Road 14 Bridge over Little Sewickley Creek, 15 Bridge Replacement 610,000 16 (Base Construction Allocation - 17 $500,000) 18 (Land Allocation - $10,000) 19 (Design and Contingencies - $100,000) 20 (4) Hempfield Township, Old Route 30 21 Bridge over Slate Creek, Bridge 22 Replacement 370,000 23 (Base Construction Allocation - 24 $300,000) 25 (Land Allocation - $10,000) 26 (Design and Contingencies - $60,000) 27 (5) Hempfield Township, Old Route 119 28 Bridge over Tributary of Jacks Run, 29 Bridge Replacement 400,000 30 (Base Construction Allocation - 19970S0186B0179 - 285 -
1 $280,000) 2 (Land Allocation - $20,000) 3 (Design and Contingencies - $100,000) 4 (6) Jeanette City, 6th Street Bridge over 5 Brush Creek, Bridge Replacement 460,000 6 (Base Construction Allocation - 7 $340,000) 8 (Land Allocation - $20,000) 9 (Design and Contingencies - $100,000) 10 (7) Ligonier Township, T-605 Bridge over 11 Two Mile Run, Bridge Replacement 320,000 12 (Base Construction Allocation - 13 $200,000) 14 (Land Allocation - $20,000) 15 (Design and Contingencies - $100,000) 16 (8) Ligonier Township, T-617, Bridge over 17 Mill Run, Bridge Replacement 310,000 18 (Base Construction Allocation - 19 $190,000) 20 (Land Allocation - $20,000) 21 (Design and Contingencies - $100,000) 22 (9) Hempfield Township, Possum Hollow Road 23 Bridge over Tributary of Little 24 Sewickley Creek, Bridge Replacement 300,000 25 (Base Construction Allocation - 26 $180,000) 27 (Land Allocation - $20,000) 28 (Design and Contingencies - $100,000) 29 (10) South Huntington Township, T-390, 30 Williams Road Bridge, Bridge 19970S0186B0179 - 286 -
1 Replacement 125,000 2 (Base Construction Allocation - 3 $100,000) 4 (Land Allocation - $5,000) 5 (Design and Contingencies - $20,000) 6 (11) South Huntington Township, T-562, 7 J.D. Smith Road Bridge, Bridge 8 Replacement 155,000 9 (Base Construction Allocation - 10 $125,000) 11 (Land Allocation - $5,000) 12 (Design and Contingencies - $25,000) 13 (12) South Huntington Township, T-386, 14 Bridge No. 1, Mount Etna Road Bridge, 15 Bridge Replacement 145,000 16 (Base Construction Allocation - 17 $115,000) 18 (Land Allocation - $5,000) 19 (Design and Contingencies - $25,000) 20 (13) South Huntington Township, T-386, 21 Bridge No.2, Mount Etna Road at Remo 22 Road, Bridge Replacement 135,000 23 (Base Construction Allocation - 24 $110,000) 25 (Land Allocation - $5,000) 26 (Design and Contingencies - $20,000) 27 (14) South Huntington Township, T-385, 28 Commer Road Bridge, Bridge Replacement 150,000 29 (Base Construction Allocation - 30 $120,000) 19970S0186B0179 - 287 -
1 (Land Allocation - $5,000) 2 (Design and Contingencies - $25,000) 3 (15) Washington Township, T-979, Pleasant 4 View Road Bridge over Beaver Run, 5 Bridge Replacement 385,000 6 (Base Construction Allocation - 7 $265,000) 8 (Land Allocation - $20,000) 9 (Design and Contingencies - $100,000) 10 (16) Derry Township, T-924, Bridge over 11 Union Run, Bridge Replacement 578,000 12 (Base Construction Allocation - 13 $463,000) 14 (Land Allocation - $15,000) 15 (Design and Contingencies - $100,000) 16 (17) Derry Township, T-937, Bridge over 17 Stony Run, Bridge Replacement 553,000 18 (Base Construction Allocation - 19 $438,000) 20 (Land Allocation - $15,000) 21 (Design and Contingencies - $100,000) 22 (18) Derry Township, T-941, Bridge over 23 Stony Run, Bridge Replacement 590,000 24 (Base Construction Allocation - 25 $475,000) 26 (Land Allocation - $15,000) 27 (Design and Contingencies - $100,000) 28 (19) Donegal Township, T-916, Bridge over 29 Indian Creek, Bridge Replacement 465,000 30 (Base Construction Allocation - 19970S0186B0179 - 288 -
1 $350,000) 2 (Land Allocation - $15,000) 3 (Design and Contingencies - $100,000) 4 (20) Donegal Township, T-880, Bridge over 5 Four Mile Run, Bridge No.3, Bridge 6 Replacement 415,000 7 (Base Construction Allocation - 8 $300,000) 9 (Land Allocation - $15,000) 10 (Design and Contingencies - $100,000) 11 (21) Donegal Township, T-880, Bridge over 12 Four Mile Run, Bridge No.5, Bridge 13 Replacement 415,000 14 (Base Construction Allocation - 15 $300,000) 16 (Land Allocation - $15,000) 17 (Design and Contingencies - $100,000) 18 (22) Fairfield Township, T-739, Berkey's 19 Bridge over Unnamed Tributary, Bridge 20 Replacement 200,000 21 (Base Construction Allocation - 22 $170,000) 23 (Land Allocation - $10,000) 24 (Design and Contingencies - $20,000) 25 (23) Fairfield Township, T-847, Bailey's 26 Bridge over Hendricks Run, Bridge 27 Replacement 200,000 28 (Base Construction Allocation - 29 $170,000) 30 (Land Allocation - $10,000) 19970S0186B0179 - 289 -
1 (Design and Contingencies - $20,000) 2 (24) Fairfield Township, T-847, Toby 3 Bridge over Unnamed Tributary, Bridge 4 Replacement 200,000 5 (Base Construction Allocation - 6 $170,000) 7 (Land Allocation - $10,000) 8 (Design and Contingencies - $20,000) 9 (25) Fairfield Township, T-931, Patterson 10 Bridge No.1 over Bear Pond Run, Bridge 11 Replacement 200,000 12 (Base Construction Allocation - 13 $170,000) 14 (Land Allocation - $10,000) 15 (Design and Contingencies - $20,000) 16 (26) Fairfield Township, T-984, Love 17 Hollow Bridge No.1 over Hendricks Run, 18 Bridge Replacement 200,000 19 (Base Construction Allocation - 20 $170,000) 21 (Land Allocation - $10,000) 22 (Design and Contingencies - $20,000) 23 (27) Fairfield Township, T-984, Love 24 Hollow Bridge No.2 over Hendricks Run, 25 Bridge Replacement 200,000 26 (Base Construction Allocation - 27 $170,000) 28 (Land Allocation - $10,000) 29 (Design and Contingencies - $20,000) 30 (28) Fairfield Township, T-988, Yeager 19970S0186B0179 - 290 -
1 Hollow Bridge No.1 over Unnamed 2 Tributary, Bridge Replacement 200,000 3 (Base Construction Allocation - 4 $170,000) 5 (Land Allocation - $10,000) 6 (Design and Contingencies - $20,000) 7 (29) Fairfield Township, T-988, Yeager 8 Hollow Bridge No.2 over Unnamed 9 Tributary, Bridge Replacement 200,000 10 (Base Construction Allocation - 11 $170,000) 12 (Land Allocation - $10,000) 13 (Design and Contingencies - $20,000) 14 (30) Fairfield Township, T-990, Patterson 15 Bridge No.2 over Unnamed Tributary, 16 Bridge Replacement 200,000 17 (Base Construction Allocation - 18 $170,000) 19 (Land Allocation - $10,000) 20 (Design and Contingencies - $20,000) 21 (31) Ligonier Township, T-505, Horner Hill 22 Road over Laughlintown Run, Bridge 23 Replacement 175,000 24 (Base Construction Allocation - 25 $125,000) 26 (Land Allocation - $15,000) 27 (Design and Contingencies - $35,000) 28 (32) Ligonier Township, T-607, Weller Road 29 over Unnamed Stream, Bridge 30 Replacement 10,000 19970S0186B0179 - 291 -
1 (Base Construction Allocation - $8,000) 2 (Design and Contingencies - $2,000) 3 (33) Ligonier Township, T-617, Robb Road 4 over Hannas Run, Bridge Replacement 310,000 5 (Base Construction Allocation - 6 $250,000) 7 (Land Allocation - $10,000) 8 (Design and Contingencies - $50,000) 9 (34) Ligonier Township, T-719, Peoples 10 Road over Unnamed Stream, Bridge 11 Replacement 100,000 12 (Base Construction Allocation - 13 $75,000) 14 (Land Allocation - $5,000) 15 (Design and Contingencies - $20,000) 16 (35) Ligonier Township, T-721, Bridge over 17 North Fork of Trout Run, Bridge 18 Replacement 200,000 19 (Base Construction Allocation - 20 $125,000) 21 (Land Allocation - $10,000) 22 (Design and Contingencies - $65,000) 23 (36) Ligonier Township, T-942, Zion Church 24 Road over Unnamed Stream, Bridge 25 Replacement 50,000 26 (Base Construction Allocation - 27 $35,000) 28 (Land Allocation - $5,000) 29 (Design and Contingencies - $10,000) 30 (37) Ligonier Township, T-984, Mill Road 19970S0186B0179 - 292 -
1 over Mill Race, Bridge Replacement 50,000 2 (Base Construction Allocation - 3 $35,000) 4 (Land Allocation - $5,000) 5 (Design and Contingencies - $10,000) 6 (38) Ligonier Township, T-950, Old Lincoln 7 Highway East over Unnamed Stream, 8 Bridge Rehabilitation 25,000 9 (Base Construction Allocation - 10 $20,000) 11 (Design and Contingencies - $5,000) 12 (39) Ligonier Township, T-984, Harvey Road 13 over Macks Run, Bridge Rehabilitation 5,000 14 (Base Construction Allocation - $4,000) 15 (Design and Contingencies - $1,000) 16 (40) Saint Clair Township, T-994, Bridge 17 over Tubmill Creek, Bridge Replacement 440,000 18 (Base Construction Allocation - 19 $325,000) 20 (Land Allocation - $15,000) 21 (Design and Contingencies - $100,000) 22 (41) Sewickley Township, T-318, Bridge 23 No.3 over Tributary of Youghiogheny 24 River, Bridge Replacement 100,000 25 (Base Construction Allocation - 26 $70,000) 27 (Land Allocation - $5,000) 28 (Design and Contingencies - $25,000) 29 (42) Derry Township, Conrail Overpass over 30 SR 0981, Bridge Replacement 1,600,000 19970S0186B0179 - 293 -
1 (Base Construction Allocation - 2 $1,200,000) 3 (Land Allocation - $200,000) 4 (Design and Contingencies - $200,000) 5 (43) Hempfield Township, T-399 over Jacks 6 Run, Bridge Replacement 428,000 7 (Base Construction Allocation - 8 $288,000) 9 (Land Allocation - $15,000) 10 (Design and Contingencies - $125,000) 11 (44) Hempfield Township, T-550 over 12 Tributary to Little Sewickley Creek, 13 Bridge Replacement 428,000 14 (Base Construction Allocation - 15 $288,000) 16 (Land Allocation - $15,000) 17 (Design and Contingencies - $125,000) 18 (45) Ligonier Township, T-984 over Mill 19 Creek, Bridge Replacement 650,000 20 (Base Construction Allocation - 21 $450,000) 22 (Land Allocation - $50,000) 23 (Design and Contingencies - $150,000) 24 (46) Salem Township, T-881, Bridge over 25 Loyalhanna Creek, Bridge Replacement 81,000 26 (Base Construction Allocation - 27 $67,000) 28 (Design and Contingencies - $14,000) 29 (b) State Bridges 30 (1) SR 0030, Mill Creek Bridge over Mill 19970S0186B0179 - 294 -
1 Creek, Ligonier Township, Bridge 2 Replacement 910,000 3 (Base Construction Allocation - 4 $710,000) 5 (Land Allocation - $25,000) 6 (Design and Contingencies - $175,000) 7 (2) SR 0031, Jacobs Creek Bridge over 8 Jacobs Creek, Mount Pleasant and 9 Bullskin Townships, Bridge Replacement 715,000 10 (Base Construction Allocation - 11 $500,000) 12 (Land Allocation - $40,000) 13 (Design and Contingencies - $175,000) 14 (3) SR0056, Seward Bridge over Conrail and 15 Local Road, St. Clair Township, Bridge 16 Painting 600,000 17 (Base Construction Allocation - 18 $600,000) 19 (4) SR 0070, I-70 Bridge over N&W 20 Railroad, Rostraver Township, Bridge 21 Rehabilitation 1,565,000 22 (Base Construction Allocation - 23 $1,305,000) 24 (Land Allocation - $60,000) 25 (Design and Contingencies - $200,000) 26 (5) SR 0070, I-70 Bridge over Conrail, 27 South Huntington Township, Bridge 28 Rehabilitation 3,125,000 29 (Base Construction Allocation - 30 $2,780,000) 19970S0186B0179 - 295 -
1 (Land Allocation - $45,000) 2 (Design and Contingencies - $300,000) 3 (6) SR 0119, Crabtree Creek Bridge No.2 4 over Crabtree Creek, Hempfield 5 Township, Bridge Replacement 577,000 6 (Base Construction Allocation - 7 $377,000) 8 (Land Allocation - $25,000) 9 (Design and Contingencies - $175,000) 10 (7) SR 0136, West Newton Bridge over 11 Youghiogheny River, West Newton 12 Borough, Bridge Painting 250,000 13 (Base Construction Allocation - 14 $250,000) 15 (8) SR 0259, Boliver Underpass Conrail 16 Railroad over SR 0259, Fairfield 17 Township, Bridge Replacement 310,000 18 (Base Construction Allocation - 19 $200,000) 20 (Land Allocation - $10,000) 21 (Design and Contingencies - $100,000) 22 (9) SR 0271, Bridge over Mill Creek, 23 Ligonier Township, Bridge Painting 87,000 24 (Base Construction Allocation - 25 $87,000) 26 (10) SR 0711, Bridge over Mill Creek, 27 Ligonier Township, Bridge Painting 125,000 28 (Base Construction Allocation - 29 $125,000) 30 (11) SR 0819, Bridge over Stauffer Bridge, 19970S0186B0179 - 296 -
1 Scottdale Borough, Bridge Painting 92,000 2 (Base Construction Allocation - 3 $92,000) 4 (12) SR 0981, Bridge over Branch of Barron 5 Run, South Huntington Township, Bridge 6 Replacement 250,000 7 (Base Construction Allocation - 8 $250,000) 9 (13) SR 0982, Bradenville Bridge over 10 Saxman Run, Derry Township, Bridge 11 Replacement 330,000 12 (Base Construction Allocation - 13 $330,000) 14 (14) SR 1027, Stoney Run Bridge over 15 Stoney Run, Derry Township, Bridge 16 Replacement 340,000 17 (Base Construction Allocation - 18 $255,000) 19 (Land Allocation - $10,000) 20 (Design and Contingencies - $75,000) 21 (15) SR 2008, Fourmile Run Bridge over 22 Fourmile Run, Cook Township, Bridge 23 Painting 83,000 24 (Base Construction Allocation - 25 $83,000) 26 (16) SR 2010, Bridge over Branch of Boyer 27 Run, Mount Pleasant Township, Bridge 28 Replacement 450,000 29 (Base Construction Allocation - 30 $250,000) 19970S0186B0179 - 297 -
1 (Land Allocation - $25,000) 2 (Design and Contingencies - $175,000) 3 (17) SR 8036, New Stanton Ramp Bridge over 4 SR 3091, New Stanton Borough, Bridge 5 Rehabilitation 475,000 6 (Base Construction Allocation - 7 $395,000) 8 (Design and Contingencies - $80,000) 9 (18) SR 0030, SR 0030 over Mill Creek, 10 Ligonier Township, Bridge 11 Rehabilitation 200,000 12 (Base Construction Allocation - 13 $150,000) 14 (Design and Contingencies - $50,000) 15 (19) SR 0030, SR 0030 over Branch of 16 Loyalhanna Creek, Unity Township, 17 Bridge Replacement 245,000 18 (Base Construction Allocation - 19 $125,000) 20 (Land Allocation - $20,000) 21 (Design and Contingencies - $100,000) 22 (20) SR 0217, SR 0217 over Miller Run, 23 Derry Township, Bridge Replacement 293,000 24 (Base Construction Allocation - 25 $188,000) 26 (Land Allocation - $5,000) 27 (Design and Contingencies - $100,000) 28 (21) SR 0259, SR 0259 over Branch of 29 Freeman Run, Fairfield Township, Bridge 30 Replacement 218,000 19970S0186B0179 - 298 -
1 (Base Construction Allocation - 2 $113,000) 3 (Land Allocation - $5,000) 4 (Design and Contingencies - $100,000) 5 (22) SR 0381, SR 0381 over Branch of 6 Loyalhanna Creek, Cook Township, Bridge 7 Replacement 670,000 8 (Base Construction Allocation - 9 $450,000) 10 (Land Allocation - $20,000) 11 (Design and Contingencies - $200,000) 12 (23) SR 0381, SR 0381 over Camp Run, 13 Donegal Township, Bridge Replacement 608,000 14 (Base Construction Allocation - 15 $388,000) 16 (Land Allocation - $20,000) 17 (Design and Contingencies - $200,000) 18 (24) SR 0711, SR 0711 over Mill Creek, 19 Ligonier Township, Bridge Replacement 600,000 20 (Base Construction Allocation - 21 $450,000) 22 (Land Allocation - $50,000) 23 (Design and Contingencies - $100,000) 24 (25) SR 0982, SR 0982 over Jacobs Creek, 25 Mount Pleasant Township, Bridge 26 Replacement 938,000 27 (Base Construction Allocation - 28 $688,000) 29 (Land Allocation - $50,000) 30 (Design and Contingencies - $200,000) 19970S0186B0179 - 299 -
1 (26) SR 0982, SR 0982 over Nine Mile Run, 2 Unity Township, Bridge Replacement 348,000 3 (Base Construction Allocation - 4 $238,000) 5 (Land Allocation - $10,000) 6 (Design and Contingencies - $100,000) 7 (27) SR 0982, SR 0982 over Indian Camp 8 Run, Unity Township, Bridge 9 Replacement 335,000 10 (Base Construction Allocation - 11 $225,000) 12 (Land Allocation - $10,000) 13 (Design and Contingencies - $100,000) 14 (28) SR 1004, SR 1004 over Hendricks 15 Creek, Fairfield Township, Bridge 16 Replacement 200,000 17 (Base Construction Allocation - 18 $170,000) 19 (Land Allocation - $10,000) 20 (Design and Contingencies - $20,000) 21 (29) SR 1006, SR 1006 over Freeman Run, 22 Fairfield Township, Bridge Replacement 833,000 23 (Base Construction Allocation - 24 $613,000) 25 (Land Allocation - $20,000) 26 (Design and Contingencies - $200,000) 27 (30) SR 1006, West Bolivar Bridge near 28 Treasure Island, Fairfield Township, 29 Bridge Replacement 200,000 30 (Base Construction Allocation - 19970S0186B0179 - 300 -
1 $170,000) 2 (Land Allocation - $10,000) 3 (Design and Contingencies - $20,000) 4 (31) SR 1007, SR 1007 over Tubmill Run, 5 Fairfield Township, Bridge Replacement 465,000 6 (Base Construction Allocation - 7 $350,000) 8 (Land Allocation - $15,000) 9 (Design and Contingencies - $100,000) 10 (32) SR 1012, SR 1012 over Branch of Megee 11 Run, Derry Township, Bridge 12 Replacement 318,000 13 (Base Construction Allocation - 14 $213,000) 15 (Land Allocation - $5,000) 16 (Design and Contingencies - $100,000) 17 (33) SR 1014, SR 1014 over Abandoned 18 Railroad, Derry Township, Bridge 19 Replacement 268,000 20 (Base Construction Allocation - 21 $163,000) 22 (Land Allocation - $5,000) 23 (Design and Contingencies - $100,000) 24 (34) SR 1015, SR 1015 over Hypocrite 25 Creek, Fairfield Township, Bridge 26 Replacement 200,000 27 (Base Construction Allocation - 28 $170,000) 29 (Land Allocation - $10,000) 30 (Design and Contingencies - $20,000) 19970S0186B0179 - 301 -
1 (35) SR 1027, SR 1027 over Branch of Stony 2 Run, Derry Township, Bridge 3 Replacement 305,000 4 (Base Construction Allocation - 5 $200,000) 6 (Land Allocation - $5,000) 7 (Design and Contingencies - $100,000) 8 (36) SR 1031, SR 1031 over McCune Run, 9 Derry Township, Bridge Replacement 293,000 10 (Base Construction Allocation - 11 $188,000) 12 (Land Allocation - $5,000) 13 (Design and Contingencies - $100,000) 14 (37) SR 2006, SR 2006 over Branch of 15 Jacobs Creek, Mt. Pleasant Township, 16 Bridge Replacement 403,000 17 (Base Construction Allocation - 18 $288,000) 19 (Land Allocation - $15,000) 20 (Design and Contingencies - $100,000) 21 (38) SR 2007, SR 2007 over Shupe Run, Mt. 22 Pleasant Township, Bridge Replacement 218,000 23 (Base Construction Allocation - 24 $113,000) 25 (Land Allocation - $5,000) 26 (Design and Contingencies - $100,000) 27 (39) SR 2012, SR 2012 over Brinker Run, 28 Mt. Pleasant Township, Bridge 29 Replacement 415,000 30 (Base Construction Allocation - 19970S0186B0179 - 302 -
1 $300,000) 2 (Land Allocation - $15,000) 3 (Design and Contingencies - $100,000) 4 (40) SR 2021, SR 2021 over Sewickley 5 Creek, Mt. Pleasant Township, Bridge 6 Replacement 1,463,000 7 (Base Construction Allocation - 8 $1,213,000) 9 (Land Allocation - $50,000) 10 (Design and Contingencies - $200,000) 11 (41) SR 2025, SR 2025 over Tributary of 12 Jacobs Creek, Mt. Pleasant Township, 13 Bridge Replacement 250,000 14 (Base Construction Allocation - 15 $225,000) 16 (Design and Contingencies - $25,000) 17 (42) SR 4034, SR 4034 over Pine Run, 18 Allegheny Township, Bridge Replacement 818,000 19 (Base Construction Allocation - 20 $588,000) 21 (Land Allocation - $30,000) 22 (Design and Contingencies - $200,000) 23 (43) SR 4071, SR 4071 over Branch of Pine 24 Run, Allegheny Township, Bridge 25 Replacement 305,000 26 (Base Construction Allocation - 27 $200,000) 28 (Land Allocation - $5,000) 29 (Design and Contingencies - $100,000) 30 (44) SR 4089, SR 4089 over Branch of 19970S0186B0179 - 303 -
1 Chartiers Run, Allegheny Township, 2 Bridge Replacement 348,000 3 (Base Construction Allocation - 4 $238,000) 5 (Land Allocation - $10,000) 6 (Design and Contingencies - $100,000) 7 (45) T-987, (formerly SR 1071) over 8 Hypocrite Creek, Fairfield Township, 9 Four State Bridges, Bridge Replacement 800,000 10 (Base Construction Allocation - 11 $680,000) 12 (Land Allocation - $40,000) 13 (Design and Contingencies - $80,000) 14 (46) SR 0381, SR 0381 over Laughlintown 15 Run, Ligonier Township, Bridge 16 Replacement 465,000 17 (Base Construction Allocation - 18 $350,000) 19 (Land Allocation - $15,000) 20 (Design and Contingencies - $100,000) 21 (47) SR 2043, SR 2043 over Two Mile Run, 22 Ligonier Township, Bridge Replacement 465,000 23 (Base Construction Allocation - 24 $350,000) 25 (Land Allocation - $15,000) 26 (Design and Contingencies - $100,000) 27 (48) SR 2045, SR 2045 over Two Mile Run, 28 Ligonier Township, Bridge Replacement 465,000 29 (Base Construction Allocation - 30 $350,000) 19970S0186B0179 - 304 -
1 (Land Allocation - $15,000) 2 (Design and Contingencies - $100,000) 3 (49) SR 2045, SR 2045 over Loyalhanna 4 Creek, Ligonier Township, Bridge 5 Replacement 1,588,000 6 (Base Construction Allocation - 7 $1,313,000) 8 (Land Allocation - $75,000) 9 (Design and Contingencies - $200,000) 10 Section 70. Wyoming County. 11 (a) Local Bridges 12 (1) Exeter Township, T-336, Bridge No.1, 2 13 Miles Southwest of Falls, Bridge 14 Replacement 280,000 15 (Base Construction Allocation - 16 $240,000) 17 (Land Allocation - $10,000) 18 (Design and Contingencies - $30,000) 19 (2) Falls Township, T-336 over White Lock 20 Stream, Bridge Replacement 280,000 21 (Base Construction Allocation - 22 $240,000) 23 (Land Allocation - $10,000) 24 (Design and Contingencies - $30,000) 25 (3) Exeter Township, T-336 over Mill 26 Creek, Bridge Replacement 214,000 27 (Base Construction Allocation - 28 $166,000) 29 (Land Allocation - $20,000) 30 (Design and Contingencies - $28,000) 19970S0186B0179 - 305 -
1 (b) State Bridges 2 (1) SR 3001, Bridge at Junction with SR 3 4004 over Branch of Susquehanna River, 4 Windham Township, Bridge Painting 60,000 5 (Base Construction Allocation - 6 $50,000) 7 (Design and Contingencies - $10,000) 8 (2) State Bridges, Countywide Bridge Zone 9 Painting, Bridge Painting 370,000 10 (Base Construction Allocation - 11 $350,000) 12 (Land Allocation - $10,000) 13 (Design and Contingencies - $10,000) 14 Section 71. York County. 15 (a) Local Bridges 16 (1) Carroll Township, Gettysburg Road 17 Bridge over Yellow Breeches Creek, 18 Bridge Replacement 860,000 19 (Base Construction Allocation - 20 $700,000) 21 (Land Allocation - $10,000) 22 (Design and Contingencies - $150,000) 23 (2) Codorus Township, Seitzville Road over 24 South Branch of Codorus Creek, Bridge 25 Replacement 300,000 26 (Base Construction Allocation - 27 $200,000) 28 (Land Allocation - $15,000) 29 (Design and Contingencies - $85,000) 30 (3) Dover Township, Cardinal Lane over Fox 19970S0186B0179 - 306 -
1 Run, Bridge Replacement 115,000 2 (Base Construction Allocation - 3 $70,000) 4 (Land Allocation - $15,000) 5 (Design and Contingencies - $30,000) 6 (4) Dover Township, Conewago Road over 7 Salem Run, Bridge Replacement 300,000 8 (Base Construction Allocation - 9 $200,000) 10 (Land Allocation - $15,000) 11 (Design and Contingencies - $85,000) 12 (5) East Hopewell Township, South Church 13 Street Extended, Bridge No.1, Bridge 14 Rehabilitation 9,000 15 (Base Construction Allocation - $8,000) 16 (Design and Contingencies - $1,000) 17 (6) East Hopewell Township, South Church 18 Street Extended, Bridge No.2, over 19 Rambo Run, Bridge Rehabilitation 60,000 20 (Base Construction Allocation - 21 $50,000) 22 (Design and Contingencies - $10,000) 23 (7) East Hopewell Township, Manifold 24 School Road Bridge, Bridge 25 Rehabilitation 7,000 26 (Base Construction Allocation - $6,000) 27 (Design and Contingencies - $1,000) 28 (8) East Hopewell Township, Trout School 29 Road Bridge, Bridge Replacement 45,000 30 (Base Construction Allocation - 19970S0186B0179 - 307 -
1 $30,000) 2 (Land Allocation - $5,000) 3 (Design and Contingencies - $10,000) 4 (9) Hellam Township, Valley Acres Road 5 over Tributary of Kreutz Creek, Bridge 6 Rehabilitation 40,000 7 (Base Construction Allocation - 8 $35,000) 9 (Design and Contingencies - $5,000) 10 (10) Hellam Township, Libhart Mill Road 11 over Tributary of Kreutz Creek, Bridge 12 Rehabilitation 40,000 13 (Base Construction Allocation - 14 $35,000) 15 (Design and Contingencies - $5,000) 16 (11) Manchester Township, T-900, Woodland 17 View Drive over Conrail, Bridge 18 Replacement 395,000 19 (Base Construction Allocation - 20 $275,000) 21 (Land Allocation - $30,000) 22 (Design and Contingencies - $90,000) 23 (12) Manchester Township, T-940, Bear Road 24 2,000 Feet North of Susquehanna Trail, 25 Bridge Replacement 40,000 26 (Base Construction Allocation - 27 $25,000) 28 (Land Allocation - $5,000) 29 (Design and Contingencies - $10,000) 30 (13) Manheim Township, T-320 over Unnamed 19970S0186B0179 - 308 -
1 Tributary of Gunpowder Falls Creek, 2 Bridge Replacement 150,000 3 (Base Construction Allocation - 4 $100,000) 5 (Land Allocation - $10,000) 6 (Design and Contingencies - $40,000) 7 (14) Manheim Township, T-346 over West 8 Branch of Codorus Creek, Bridge 9 Replacement 250,000 10 (Base Construction Allocation - 11 $190,000) 12 (Land Allocation - $10,000) 13 (Design and Contingencies - $50,000) 14 (15) Manheim Township, T-357 over Unnamed 15 Tributary of West Branch of Codorus 16 Creek, Bridge Replacement 160,000 17 (Base Construction Allocation - 18 $110,000) 19 (Land Allocation - $10,000) 20 (Design and Contingencies - $40,000) 21 (16) Manheim Township, T-370 over West 22 Branch of Codorus Creek, Bridge 23 Replacement 200,000 24 (Base Construction Allocation - 25 $140,000) 26 (Land Allocation - $10,000) 27 (Design and Contingencies - $50,000) 28 (17) Manheim Township, T-413 over West 29 Branch of Codorus Creek, Bridge 30 Replacement 150,000 19970S0186B0179 - 309 -
1 (Base Construction Allocation - 2 $100,000) 3 (Land Allocation - $10,000) 4 (Design and Contingencies - $40,000) 5 (18) Manheim Township, Tannery Road over 6 West Branch of Codorus Creek, Bridge 7 Replacement 250,000 8 (Base Construction Allocation - 9 $180,000) 10 (Land Allocation - $10,000) 11 (Design and Contingencies - $60,000) 12 (19) Paradise Township, Shady Dell Road, 13 Bridge Replacement 190,000 14 (Base Construction Allocation - 15 $110,000) 16 (Land Allocation - $10,000) 17 (Design and Contingencies - $70,000) 18 (20) Paradise Township, Beaver Creek Road 19 over Beaver Creek, Bridge Replacement 275,000 20 (Base Construction Allocation - 21 $195,000) 22 (Land Allocation - $10,000) 23 (Design and Contingencies - $70,000) 24 (21) Penn Township, Center Street over 25 Tributary of Oil Creek, Bridge 26 Replacement 183,000 27 (Base Construction Allocation - 28 $163,000) 29 (Land Allocation - $10,000) 30 (Design and Contingencies - $10,000) 19970S0186B0179 - 310 -
1 (22) Penn Township, Westminster Avenue 2 over Plum Creek, Bridge Replacement 230,000 3 (Base Construction Allocation - 4 $207,000) 5 (Land Allocation - $8,000) 6 (Design and Contingencies - $15,000) 7 (23) Penn Township, Park Heights over 8 Tributary of Plum Creek, Bridge 9 Replacement 244,000 10 (Base Construction Allocation - 11 $234,000) 12 (Design and Contingencies - $10,000) 13 (24) Red Lion Borough, North Charles 14 Street over Former Maryland and 15 Pennsylvania Railroad, Bridge 16 Replacement 395,000 17 (Base Construction Allocation - 18 $275,000) 19 (Land Allocation - $30,000) 20 (Design and Contingencies - $90,000) 21 (25) Spring Garden Township, Tri Hill Road 22 over Tyler Run, Bridge Replacement 200,000 23 (Base Construction Allocation - 24 $120,000) 25 (Land Allocation - $20,000) 26 (Design and Contingencies - $60,000) 27 (26) Windsor Borough, West Gay Street over 28 Fishing Creek, Bridge Replacement 200,000 29 (Base Construction Allocation - 30 $120,000) 19970S0186B0179 - 311 -
1 (Land Allocation - $20,000) 2 (Design and Contingencies - $60,000) 3 (27) York Township, School Street over 4 Branch of Mill Creek, Bridge 5 Replacement 250,000 6 (Base Construction Allocation - 7 $200,000) 8 (Design and Contingencies - $50,000) 9 (b) State Bridges 10 (1) SR 0194, Broadway Street Bridge over 11 Red Run, Washington Township, Bridge 12 Replacement 245,000 13 (Base Construction Allocation - 14 $150,000) 15 (Land Allocation - $10,000) 16 (Design and Contingencies - $85,000) 17 (2) SR 0234, East Berlin Road Bridge over 18 Paradise Creek, Jackson Township, 19 Bridge Replacement 325,000 20 (Base Construction Allocation - 21 $250,000) 22 (Land Allocation - $10,000) 23 (Design and Contingencies - $65,000) 24 (3) SR 3074, Smoketown Road Bridge over 25 Cod Creek, Manheim Township, Bridge 26 Replacement 325,000 27 (Base Construction Allocation - 28 $215,000) 29 (Land Allocation - $10,000) 30 (Design and Contingencies - $100,000) 19970S0186B0179 - 312 -
1 (4) SR 0116, York Street over Tributary of 2 Oil Creek, Penn Township, Bridge 3 Replacement 275,000 4 (Base Construction Allocation - 5 $240,000) 6 (Land Allocation - $15,000) 7 (Design and Contingencies - $20,000) 8 (5) SR 0116, SR 0116 over Codorus Creek, 9 Spring Grove Borough, Bridge 10 Replacement 300,000 11 (Base Construction Allocation - 12 $240,000) 13 (Land Allocation - $15,000) 14 (Design and Contingencies - $45,000) 15 (6) SR 0194, Frederick Street over Plum 16 Creek, Penn Township, Bridge 17 Replacement 262,000 18 (Base Construction Allocation - 19 $234,000) 20 (Land Allocation - $8,000) 21 (Design and Contingencies - $20,000) 22 (7) SR 1012, Emig Road over Conrail, 23 Manchester Township, Bridge 24 Replacement 395,000 25 (Base Construction Allocation - 26 $275,000) 27 (Land Allocation - $30,000) 28 (Design and Contingencies - $90,000) 29 (8) SR 2031, Penn Street over Fishing 30 Creek, Windsor Borough, Bridge 19970S0186B0179 - 313 -
1 Replacement 200,000 2 (Base Construction Allocation - 3 $120,000) 4 (Land Allocation - $20,000) 5 (Design and Contingencies - $60,000) 6 (9) SR 3001, South George Street over 7 Tyler Run, Spring Garden Township, 8 Bridge Replacement 200,000 9 (Base Construction Allocation - 10 $120,000) 11 (Land Allocation - $20,000) 12 (Design and Contingencies - $60,000) 13 Section 72. Statewide. 14 Construction of advanced wetland mitigation 15 projects necessary to replace wetlands displaced 16 by bridge projects authorized under the act of 17 December 8, 1982 (P.L.848, No.235), known as the 18 Highway-Railroad and Highway Bridge Capital Budget 19 Act for 1982-1983 3,100,000 20 (Base Construction Allocation - 21 $2,500,000) 22 (Land Allocation - $350,000) 23 (Design and Contingencies - $250,000) 24 Section 73. Limitation on expenditure of funds. 25 Any moneys derived from the incurring of debt shall be used 26 solely for effecting the rehabilitation, replacement or removal 27 of bridges located on State highways. All other bridge 28 rehabilitation, replacement or removal shall be financed and 29 State bridge rehabilitation, replacement or removal may also be 30 financed from current revenue. 19970S0186B0179 - 314 -
1 Section 74. Debt authorization. 2 The Governor, Auditor General and State Treasurer are hereby 3 authorized and directed to borrow from time to time, in addition 4 to any authorization heretofore or hereafter enacted, on the 5 credit of the Commonwealth, subject to the limitations provided 6 in the current capital budget, money not exceeding in the 7 aggregate the sum of $834,398,000 as may be found necessary to 8 carry out the acquisition and construction of the State highway 9 projects specifically itemized in this act. 10 Section 75. Issue of bonds. 11 The indebtedness authorized in this act shall be incurred 12 from time to time and shall be evidenced by one or more series 13 of general obligation bonds of the Commonwealth in such 14 aggregate principal amount for each series as the Governor, 15 Auditor General and State Treasurer shall determine, but the 16 latest stated maturity date shall not exceed 30 years from the 17 date of the bond first issued for each series. 18 Section 76. Estimated useful life of projects. 19 The General Assembly states the estimated useful life of the 20 projects itemized in this act as 30 years. 21 Section 77. Appropriation. 22 The net proceeds of the sale of the obligations authorized in 23 this act are hereby appropriated from the Capital Facilities 24 Fund to the department in the maximum amount of $834,398,000 to 25 be used by it exclusively to defray the financial costs of the 26 State projects specifically itemized in this capital budget. 27 After reserving or paying the expenses of the sale of the 28 obligation, the State Treasurer shall pay out to the department 29 the moneys as required and certified by it to be legally due and 30 payable. 19970S0186B0179 - 315 -
1 Section 78. Federal funds. 2 In addition to those funds appropriated in section 77, all 3 moneys received from the Federal Government for the public 4 improvement projects specifically itemized in this act are also 5 hereby appropriated for those projects. 6 Section 79. Allocation of funds. 7 (a) General rule.--Whenever the department determines that 8 the full estimated financial costs of the projects itemized in 9 this act are not necessary for the proper design, acquisition or 10 construction of such projects, the excess funds no longer 11 required may be allocated by the department to increase the 12 estimated costs of any one or more of the projects specifically 13 itemized in a capital budget. 14 (b) Reimbursement of municipal expenditures.--Moneys raised 15 or expended by municipalities after the effective date of this 16 act, in anticipation of receipt of funds authorized for projects 17 itemized by this act, may be reimbursable to those 18 municipalities. 19 Section 80. Policy on jobs and materials. 20 (a) Jobs.--It is the declared policy of the Commonwealth 21 that the construction projects authorized in this act be used, 22 to the greatest extent possible, to provide for the creation of 23 jobs and the rehiring of the unemployed in this Commonwealth. In 24 order to reach this goal, firms with Commonwealth-based 25 facilities shall be actively solicited to make bids on contracts 26 to furnish products and materials, including, but not limited 27 to, steel and steel products, to be used in these projects. 28 (b) Materials.--Every contract document entered into to 29 undertake a project contained in this act shall provide that any 30 steel or other products to be used or supplied in the 19970S0186B0179 - 316 -
1 performance of this contract shall be required to be 2 manufactured by plants in the United States unless the secretary 3 determines, on a contract by contract basis, that certain 4 required products are not produced in the United States in 5 sufficient quantities to meet the requirements of the contract. 6 Such a determination and the reasons therefor shall be published 7 in the Pennsylvania Bulletin. Decisions made under this 8 subsection shall not be inconsistent with the general provisions 9 of the act of March 3, 1978 (P.L.6, No.3), known as the Steel 10 Products Procurement Act. 11 (c) Minorities and women.--It is also the declared policy of 12 the Commonwealth to require and encourage substantial 13 participation by minorities and women in the construction 14 projects authorized by this act. 15 Section 81. Payment of capital debt service. 16 The repayment of any debt incurred pursuant to this act shall 17 be made from the account and such repayment shall have first 18 claim on the revenues of the account. 19 Section 82. Authorization and debt cumulation. 20 The additional authorization and debt allowance provided for 21 in this act shall be added to the total authorizations and debt 22 incurred pursuant to the act of December 8, 1982 (P.L.848, 23 No.235), known as the Highway-Railroad and Highway Bridge 24 Capital Budget Act for 1982-1983, as amended and supplemented. 25 Section 83. Editorial changes. 26 In editing and preparing this act for printing following the 27 final enactment, the Legislative Reference Bureau shall insert 28 or revise letters or numbers for projects where the letters or 29 numbers are missing or require revision. The bureau shall also 30 revise the total monetary amounts for the total authorization, 19970S0186B0179 - 317 -
1 debt authorization, appropriations and departmental totals as 2 necessary to agree with the total monetary amounts of the 3 projects. 4 Section 84. Effective date. 5 This act shall take effect immediately. A3L86BIL/19970S0186B0179 - 318 -