PRINTER'S NO. 514
No. 504 Session of 1999
INTRODUCED BY STOUT AND MADIGAN, FEBRUARY 26, 1999
REFERRED TO TRANSPORTATION, FEBRUARY 26, 1999
A SUPPLEMENT 1 To the act of December 8, 1982 (P.L.848, No.235), entitled "An 2 act providing for the adoption of capital projects related to 3 the repair, rehabilitation or replacement of highway bridges 4 to be financed from current revenue or by the incurring of 5 debt and capital projects related to highway and safety 6 improvement projects to be financed from current revenue of 7 the Motor License Fund," itemizing additional local and State 8 bridge projects. 9 The General Assembly of the Commonwealth of Pennsylvania 10 hereby enacts as follows: 11 Section 1. Short title. 12 This act shall be known and may be cited as the Highway- 13 Railroad and Highway Bridge Capital Budget Supplemental Act for 14 1999-2000. 15 Section 2. Definitions. 16 The following words and phrases when used in this act shall 17 have the meanings given to them in this section unless the 18 context clearly indicates otherwise: 19 "Account." The Highway Bridge Improvement Restricted Account 20 within the Motor License Fund.
1 "Capital project." A capital project as defined in section 2 1602-B of the act of April 9, 1929 (P.L.343, No.176), known as 3 The Fiscal Code, and shall include a county or municipal bridge 4 rehabilitation, replacement or improvement project as set forth 5 in this act. 6 "Department." The Department of Transportation of the 7 Commonwealth. 8 "Secretary." The Secretary of Transportation of the 9 Commonwealth. 10 Section 3. Total authorization for bridge projects. 11 (a) Total projects.--The total authorization for the costs 12 of the projects itemized pursuant to this act and to be financed 13 from current revenue or by the incurring of debt shall be 14 $1,894,222,000. 15 (b) State projects.--The authorization for capital projects 16 in the category of highway bridge projects and forestry and 17 State park bridge projects to be constructed by the Department 18 of Transportation or the Department of Conservation and Natural 19 Resources, or their successors or assigns, and to be financed by 20 the incurring of debt or from the highway account, itemized in 21 this act under the category of State bridges, shall be 22 $1,485,147,000. 23 (c) Non-State projects.--The authorization for non-State 24 highway bridge projects to be constructed by municipalities and 25 to be financed in part with grants not exceeding 80% of the non- 26 Federal share of the costs made to the local government 27 municipalities by the department from revenues deposited in the 28 account itemized in this act under the category of local 29 bridges, shall be $409,075,000. 30 Section 4. Itemization of bridge projects. 19990S0504B0514 - 2 -
1 The individual capital projects in the category of highway 2 projects to be constructed by the Department of Transportation, 3 its successors or assigns, and to be financed from current 4 revenue or by the incurring of debt are hereby itemized, 5 together with their estimated financial costs, in the following 6 sections. 7 Section 5. Adams County. 8 (a) Local Bridges 9 (1) Cumberland Township, T-338, Herr's 10 Ridge Road Bridge over Willoughby Run, 11 Bridge Rehabilitation 170,000 12 (Base Construction Allocation - 13 $100,000) 14 (Land Allocation - $10,000) 15 (Design and Contingencies - $60,000) 16 (2) Cumberland Township, T-402, Horner 17 Road Bridge over Marsh Creek, County 18 Bridge No.111, Bridge Replacement 1,075,000 19 (Base Construction Allocation - 20 $725,000) 21 (Land Allocation - $25,000) 22 (Design and Contingencies - $325,000) 23 (3) Cumberland Township, T-417, Goulden 24 Road Bridge over Rock Creek, County 25 Bridge No.123, Bridge Rehabilitation 330,000 26 (Base Construction Allocation - 27 $250,000) 28 (Land Allocation - $5,000) 29 (Design and Contingencies - $75,000) 30 (4) Cumberland and Freedom Townships, T- 19990S0504B0514 - 3 -
1 509, Sachs Mill Covered Bridge over 2 Marsh Creek, Pedestrian Bridge, Bridge 3 Rehabilitation 749,000 4 (Base Construction Allocation - 5 $698,000) 6 Design and Contingencies - $51,000 7 (b) State Bridges (Reserved) 8 Section 6. Allegheny County. 9 (a) Local Bridges 10 (1) Plum Borough, Mary Street Bridge over 11 Plum Creek, Bridge Replacement 630,000 12 (Base Construction Allocation - 13 $400,000) 14 (Land Allocation - $50,000) 15 (Design and Contingencies - $180,000) 16 (2) City of Pittsburgh, Glenwood Bridge, 17 Phase II over Monongahela River, Three 18 Railroads and Carson Street, Bridge 19 Rehabilitation 4,180,000 20 (Base Construction Allocation - 21 $3,905,000) 22 (Design and Contingencies - $275,000) 23 (3) Elizabeth Township, Patterson Road, 24 Boyd Hollow Bridge, Bridge Replacement 225,000 25 (Base Construction Allocation - 26 $180,000) 27 (Land Allocation - $11,000) 28 (Design and Contingencies - $34,000) 29 (4) Elizabeth Township, Yates Street 30 Bridge, Bridge Replacement 198,000 19990S0504B0514 - 4 -
1 (Base Construction Allocation - 2 $158,000) 3 (Land Allocation - $10,000) 4 (Design and Contingencies - $30,000) 5 (5) Shaler Township, South of Martha 6 Avenue, Anderson Road over Wible Run, 7 Bridge Replacement 500,000 8 (Base Construction Allocation - 9 $400,000) 10 (Design and Contingencies - $100,000) 11 (6) Baldwin Borough, Old Clairton Road 12 over CSX Railroad, Bridge 13 Rehabilitation 80,000 14 (Base Construction Allocation - 15 $65,000) 16 (Design and Contingencies - $15,000) 17 (7) Ben Avon Borough, Spruce Run Road over 18 Spruce Run, Bridge Rehabilitation 265,000 19 (Base Construction Allocation - 20 $200,000) 21 (Land Allocation - $5,000) 22 (Design and Contingencies - $60,000) 23 (8) City of Pittsburgh, Swinburne Street, 24 Bridge Painting 1,530,000 25 (Base Construction Allocation - 26 $1,500,000) 27 (Design and Contingencies - $30,000) 28 (9) City of Pittsburgh, Railroad Bridge 29 (Hot Metal Bridge) at Former LTV Steel 30 Company over Monongahela River, Bridge 19990S0504B0514 - 5 -
1 Rehabilitation 25,000,000 2 (Base Construction Allocation - 3 $22,500,000) 4 (Design and Contingencies - $2,500,000) 5 (10) Edgeworth Borough, Beaver Street over 6 Little Sewickley Creek, Bridge 7 Replacement 358,000 8 (Base Construction Allocation - 9 $250,000) 10 (Land Allocation - $8,000) 11 (Design and Contingencies - $100,000) 12 (11) Forward Township, Pangburn Hollow 13 Road over Pangburn Run, Bridge 14 Replacement 200,000 15 (Base Construction Allocation - 16 $150,000) 17 (Land Allocation - $10,000) 18 (Design and Contingencies - $40,000) 19 (12) Hampton Township, Duncan Avenue over 20 Pine Creek, Bridge Replacement 200,000 21 (Base Construction Allocation - 22 $150,000) 23 (Land Allocation - $10,000) 24 (Design and Contingencies - $40,000) 25 (13) Harrison Township, Natrona Road over 26 Small Branch of Allegheny River, Bridge 27 Rehabilitation 210,000 28 (Base Construction Allocation - 29 $160,000) 30 (Land Allocation - $10,000) 19990S0504B0514 - 6 -
1 (Design and Contingencies - $40,000) 2 (14) Jefferson Borough, Coal Valley Road 3 Bridge No.2 over McRoberts Run, Bridge 4 Rehabilitation 200,000 5 (Base Construction Allocation - 6 $150,000) 7 (Land Allocation - $10,000) 8 (Design and Contingencies - $40,000) 9 (15) Jefferson Borough, Coal Valley Road 10 Bridge No.4 over McRoberts Run, Bridge 11 Rehabilitation 200,000 12 (Base Construction Allocation - 13 $150,000) 14 (Land Allocation - $10,000) 15 (Design and Contingencies - $40,000) 16 (16) Leetsdale Borough, Beaver Road over 17 Big Sewickley Creek, Bridge 18 Replacement 420,000 19 (Base Construction Allocation - 20 $300,000) 21 (Land Allocation - $10,000) 22 (Design and Contingencies - $110,000) 23 (17) Municipality of Penn Hills, Mt. 24 Carmel Road over Sandy Creek, Bridge 25 Replacement 230,000 26 (Base Construction Allocation - 27 $170,000) 28 (Land Allocation - $10,000) 29 (Design and Contingencies - $50,000) 30 (18) Municipality of Penn Hills, Lincoln 19990S0504B0514 - 7 -
1 Road Bridge No.6 over Sandy Creek, 2 Bridge Replacement 215,000 3 (Base Construction Allocation - 4 $150,000) 5 (Land Allocation - $5,000) 6 (Design and Contingencies - $60,000) 7 (19) Municipality of Penn Hills, Lincoln 8 Road Bridge No.12 over Sandy Creek, 9 Bridge Replacement 215,000 10 (Base Construction Allocation - 11 $150,000) 12 (Land Allocation - $5,000) 13 (Design and Contingencies - $60,000) 14 (20) Sewickley Heights Borough, Blackburn 15 Road over Kilbuck Run, Bridge 16 Rehabilitation 145,000 17 (Base Construction Allocation - 18 $110,000) 19 (Land Allocation - $5,000) 20 (Design and Contingencies - $30,000) 21 (21) South Park Township, Sleepy Hollow 22 Road over Sleepy Hollow, Bridge 23 Replacement 295,000 24 (Base Construction Allocation - 25 $200,000) 26 (Land Allocation - $5,000) 27 (Design and Contingencies - $90,000) 28 (22) South Park Township, Cochran's Mill 29 Road over Licks Run, Bridge 30 Replacement 215,000 19990S0504B0514 - 8 -
1 (Base Construction Allocation - 2 $150,000) 3 (Land Allocation - $5,000) 4 (Design and Contingencies - $60,000) 5 (23) Hampton Township, T-357, Bridge over 6 Gourdhead Run, Bridge Rehabilitation 320,000 7 (Base Construction Allocation - 8 $280,000) 9 (Design and Contingencies - $40,000) 10 (24) Hampton Township, T-984, South 11 Pioneer Road Bridge No.1 over Crouse 12 Run, Bridge Rehabilitation 250,000 13 (Base Construction Allocation - 14 $210,000) 15 (Design and Contingencies - $40,000) 16 (25) Hampton Township, T-984, South 17 Pioneer Road Bridge No.2 over Crouse 18 Run, Bridge Rehabilitation 250,000 19 (Base Construction Allocation - 20 $210,000) 21 (Design and Contingencies - $40,000) 22 (26) Marshall Township, T-482, Northgate 23 Drive Bridge over Brush Creek, Bridge 24 Replacement 320,000 25 (Base Construction Allocation - 26 $280,000) 27 (Land Allocation - $5,000) 28 (Design and Contingencies - $35,000) 29 (27) Town of McCandless, Blazier Drive 30 Bridge No.1 over Pine Creek, Bridge 19990S0504B0514 - 9 -
1 Rehabilitation 17,000 2 (Base Construction Allocation - 3 $15,000) 4 (Design and Contingencies - $2,000) 5 (28) Town of McCandless, Blazier Drive 6 Bridge No.2 over Pine Creek, Bridge 7 Rehabilitation 28,000 8 (Base Construction Allocation - 9 $26,000) 10 (Design and Contingencies - $2,000) 11 (29) Town of McCandless, Blazier Drive 12 Bridge No.3 over Pine Creek, Bridge 13 Rehabilitation 3,000 14 (Base Construction Allocation - $2,000) 15 (Design and Contingencies - $1,000) 16 (30) Town of McCandless, Oakridge Drive 17 over Pine Creek, Bridge Rehabilitation 10,000 18 (Base Construction Allocation - $8,000) 19 (Design and Contingencies - $2,000) 20 (31) Town of McCandless, Meinert Road over 21 Pine Creek, Bridge Rehabilitation 3,000 22 (Base Construction Allocation - $2,000) 23 (Design and Contingencies - $1,000) 24 (32) Collier Township, Thom's Run Road- 25 Oakdale Road No.4 over Thom's Run, 26 Bridge Replacement 210,000 27 (Base Construction Allocation - 28 $160,000) 29 (Land Allocation - $10,000) 30 (Design and Contingencies - $40,000) 19990S0504B0514 - 10 -
1 (33) Collier Township, Thom's Run Road- 2 Oakdale Road No.5 over Thom's Run, 3 Bridge Replacement 210,000 4 (Base Construction Allocation - 5 $160,000) 6 (Land Allocation - $10,000) 7 (Design and Contingencies - $40,000) 8 (34) Collier Township, Thom's Run Road- 9 Oakdale Road No.9 over Thom's Run, 10 Bridge Replacement 180,000 11 (Base Construction Allocation - 12 $130,000) 13 (Land Allocation - $10,000) 14 (Design and Contingencies - $40,000) 15 (35) Etna Borough, Dewey Street over 16 Little Pine Creek, Bridge 17 Rehabilitation 23,000 18 (Base Construction Allocation - 19 $20,000) 20 (Design and Contingencies - $3,000) 21 (36) Forward Township, Roberts Hollow Road 22 over Fallen Timber Run, Bridge 23 Replacement 200,000 24 (Base Construction Allocation - 25 $160,000) 26 (Land Allocation - $10,000) 27 (Design and Contingencies - $30,000) 28 (37) Hampton Township, Duncan Avenue over 29 Stillhouse Run, Bridge Replacement 230,000 30 (Base Construction Allocation - 19990S0504B0514 - 11 -
1 $170,000) 2 (Land Allocation - $10,000) 3 (Design and Contingencies - $50,000) 4 (38) Penn Hills Township, Lincoln Road 5 over Ryans Run, Bridge Replacement 190,000 6 (Base Construction Allocation - 7 $140,000) 8 (Land Allocation - $10,000) 9 (Design and Contingencies - $40,000) 10 (39) Penns Hills Township, Lincoln Road 11 over Sandy Creek, Bridge Replacement 195,000 12 (Base Construction Allocation - 13 $150,000) 14 (Land Allocation - $5,000) 15 (Design and Contingencies - $40,000) 16 (40) North Versailles Township, Crooked 17 Run Road over Crooked Run, Bridge 18 Replacement 170,000 19 (Base Construction Allocation - 20 $130,000) 21 (Land Allocation - $10,000) 22 (Design and Contingencies - $30,000) 23 (41) O'Hara Township, Brownhill Road over 24 Little Pine Creek, Bridge Replacement 275,000 25 (Base Construction Allocation - 26 $231,000) 27 (Design and Contingencies - $44,000) 28 (42) Ross Township, Thompson Run Road over 29 South Branch of Pine Creek, Bridge 30 Replacement 210,000 19990S0504B0514 - 12 -
1 (Base Construction Allocation - 2 $160,000) 3 (Land Allocation - $8,000) 4 (Design and Contingencies - $42,000) 5 (43) Moon Township, T-114, Becks Run Road 6 over Flaugherty Run, Bridge 7 Replacement 420,000 8 (Base Construction Allocation - 9 $350,000) 10 (Land Allocation - $20,000) 11 (Design and Contingencies - $50,000) 12 (44) Homestead Borough, High Level Bridge, 13 Bridge Rehabilitation and Upgrade 250,000 14 (45) North Braddock Borough, Hawkins 15 Avenue Bridge, Bridge Rehabilitation 300,000 16 (46) Penn Hills Borough, Beechtree Road 17 Box Culvert Bridge, Bridge 18 Rehabilitation 100,000 19 (47) Whitaker Borough, Rankin Bridge, 20 Bridge Rehabilitation 100,000 21 (48) Swissvale Borough, Kenmaur Bridge 22 connecting Swissvale and Rankin, Bridge 23 Replacement 320,000 24 (Base Construction Allocation - 25 $270,000) 26 (Design and Contingencies - $50,000) 27 (49) Wilkins Township, Brown Avenue Bridge 28 over Brown Run, Bridge Replacement 475,000 29 (Base Construction Allocation - 30 $380,000) 19990S0504B0514 - 13 -
1 (Design and Contingencies - $95,000) 2 (50) Wilkins Township, Ivy Street Bridge 3 over Brown Run, Bridge Replacement 268,000 4 (Base Construction Allocation - 5 $214,000) 6 (Design and Contingencies - $54,000) 7 (51) Wilkins Township, Baker Street Bridge 8 over Chalfant Run, Bridge Replacement 205,000 9 (Base Construction Allocation - 10 $164,000) 11 (Design and Contingencies - $41,000) 12 (52) Upper St. Clair Township, Walther 13 Lane Bridge, Bridge Replacement 700,000 14 (Base Construction Allocation - 15 $650,000) 16 (Design and Contingencies - $50,000) 17 (53) Green Tree Borough, Trumball Drive 18 Bridge over Wheeling and Lake Erie 19 Railroad, Bridge Rehabilitation 575,000 20 (Base Construction Allocation - 21 $500,000) 22 (Design and Contingencies - $75,000) 23 (54) City of Pittsburgh, Fancourt Street 24 Bridge, Bridge Replacement 625,000 25 (Base Construction Allocation - 26 $500,000) 27 (Design and Contingencies - $125,000) 28 (b) State Bridges 29 (1) SR 0028, Etna Bridge, Northbound 30 Bridge No.4 to Existing SR 0028, Etna 19990S0504B0514 - 14 -
1 Borough, Shaler Township, Sharpsburg 2 Borough and O'Hara Township, Bridge 3 Rehabilitation 7,415,000 4 (Base Construction Allocation - 5 $7,115,000) 6 (Land Allocation - $300,000) 7 (2) SR 0028, Etna Bridge to 62nd Street 8 Bridge, Etna Borough, Shaler Township, 9 Sharpsburg Borough and O'Hara Township, 10 Bridge Rehabilitation 17,222,000 11 (Base Construction Allocation - 12 $17,022,000) 13 (Land Allocation - $200,000) 14 (3) SR 0030, Ardmore Westbound Electric 15 over SR 2112, Chalfant Borough, Bridge 16 Replacement 3,100,000 17 (Base Construction Allocation - 18 $3,000,000) 19 (Design and Contingencies - $100,000) 20 (4) SR 0030, Ardmore Eastbound Electric 21 over SR 2112, Chalfant Borough, Bridge 22 Replacement 2,500,000 23 (Base Construction Allocation - 24 $2,400,000) 25 (Design and Contingencies - $100,000) 26 (5) SR 0030, Ardmore Boulevard Bridge No.1 27 over Falls Run, North of SR 8012 28 Interchange, Forest Hills Borough, 29 Bridge Replacement 550,000 30 (Base Construction Allocation - 19990S0504B0514 - 15 -
1 $400,000) 2 (Land Allocation - $50,000) 3 (Design and Contingencies - $100,000) 4 (6) SR 0048, Boston Hollow Road Bridge 5 over Unnamed Stream, North of Lincoln 6 Borough, Elizabeth Borough, Bridge 7 Replacement 340,000 8 (Base Construction Allocation - 9 $200,000) 10 (Land Allocation - $40,000) 11 (Design and Contingencies - $100,000) 12 (7) SR 0050, Bridge over Chartiers Creek, 13 Northbound Lane, Heidelberg Borough, 14 Scott Township, Bridge Rehabilitation 3,750,000 15 (Base Construction Allocation - 16 $3,300,000) 17 (Land Allocation - $50,000) 18 (Design and Contingencies - $400,000) 19 (8) SR 0060, South Main Street Bridge over 20 Saw Mill Run, South of West End Circle, 21 City of Pittsburgh, Bridge Painting 178,000 22 (Base Construction Allocation - 23 $173,000) 24 (Design and Contingencies - $5,000) 25 (9) SR 0130, Tri-Borough Extended Bridge 26 over Patton Street at SR 8076 27 Interchange, Wilmerding Borough, Bridge 28 Rehabilitation 505,000 29 (Base Construction Allocation - 30 $400,000) 19990S0504B0514 - 16 -
1 (Land Allocation - $30,000) 2 (Design and Contingencies - $75,000) 3 (10) SR 0148, Bridge over Crooked Run 4 Creek near SR 2037, White Oak Borough, 5 Bridge Replacement 350,000 6 (Base Construction Allocation - 7 $200,000) 8 (Land Allocation - $50,000) 9 (Design and Contingencies - $100,000) 10 (11) SR 0791, Bridge over Chalfont Run at 11 SR 2048, Wilkins Township, Bridge 12 Replacement 450,000 13 (Base Construction Allocation - 14 $300,000) 15 (Land Allocation - $50,000) 16 (Design and Contingencies - $100,000) 17 (12) SR 0837, Northbound Ramp A to SR 0885 18 Southbound, City of Pittsburgh, Bridge 19 Rehabilitation 1,350,000 20 (Base Construction Allocation - 21 $1,250,000) 22 (Design and Contingencies - $100,000) 23 (13) SR 0978, Miller's Run Road Bridge 24 over Dolphin Run, South Fayette 25 Township, Bridge Replacement 300,000 26 (Base Construction Allocation - 27 $200,000) 28 (Design and Contingencies - $100,000) 29 (14) SR 1001, West 7th Avenue Bridge over 30 Bull Creek, Tarentum Borough, Bridge 19990S0504B0514 - 17 -
1 Replacement 400,000 2 (Base Construction Allocation - 3 $300,000) 4 (Design and Contingencies - $100,000) 5 (15) SR 1011, Guys Run Road Bridge over 6 Guys Run, North of SR 0028, Harmar 7 Township, Bridge Replacement 350,000 8 (Base Construction Allocation - 9 $200,000) 10 (Land Allocation - $50,000) 11 (Design and Contingencies - $100,000) 12 (16) SR 2001, Glassport-Elizabeth Road 13 Bridge over Burns Run, North of 14 Elizabeth Township, Lincoln Borough, 15 Bridge Replacement 350,000 16 (Base Construction Allocation - 17 $200,000) 18 (Land Allocation - $50,000) 19 (Design and Contingencies - $100,000) 20 (17) SR 2081, Turtle Creek-Monroeville 21 Road over US 22 Business, Monroeville 22 Borough, Bridge Replacement 1,060,000 23 (Base Construction Allocation - 24 $960,000) 25 (Design and Contingencies - $100,000) 26 (18) SR 2094, Jerome Street Bridge over SR 27 2027, Youghiogheny River, McKeesport 28 Borough, Bridge Rehabilitation 4,600,000 29 (Base Construction Allocation - 30 $4,500,000) 19990S0504B0514 - 18 -
1 (Design and Contingencies - $100,000) 2 (19) SR 3066, Steubenville Pike Bridge 3 over US 22, North Fayette Township, 4 Bridge Rehabilitation 500,000 5 (Base Construction Allocation - 6 $400,000) 7 (Land Allocation - $25,000) 8 (Design and Contingencies - $75,000) 9 (20) SR 3069, Liberty Tunnel Airshaft 10 between SR 0051 and Liberty Bridge, 11 City of Pittsburgh, Airshaft 12 Restoration 1,570,000 13 (Base Construction Allocation - 14 $1,370,000) 15 (Design and Contingencies - $200,000) 16 (21) SR 3104, McKees Rocks Sidewalk over 17 Harriet Street, McKees Rocks Borough, 18 Bridge Rehabilitation 6,800,000 19 (Base Construction Allocation - 20 $6,700,000) 21 (Design and Contingencies - $100,000) 22 (22) SR 4036, Big Sewickley Creek Road 23 over Big Sewickley Creek at SR 2003, 24 Bell Acres Borough, Bridge 25 Rehabilitation 500,000 26 (Base Construction Allocation - 27 $400,000) 28 (Land Allocation - $25,000) 29 (Design and Contingencies - $75,000) 30 (23) SR 8043, Southbound Ramp Bridge over 19990S0504B0514 - 19 -
1 SR 0019 and SR 0065, City of 2 Pittsburgh, Bridge Rehabilitation 2,400,000 3 (Base Construction Allocation - 4 $2,100,000) 5 (Land Allocation - $50,000) 6 (Design and Contingencies - $250,000) 7 (24) SR 8045, Ramp at Stadium over SR 0065 8 and Stadium Drive, City of Pittsburgh, 9 Bridge Rehabilitation 600,000 10 (Base Construction Allocation - 11 $600,000) 12 (25) SR 8049, SR 0019 Bridge Ramp, Chateau 13 Street to SR 0019, City of Pittsburgh, 14 Bridge Rehabilitation 2,350,000 15 (Base Construction Allocation - 16 $2,000,000) 17 (Land Allocation - $50,000) 18 (Design and Contingencies - $300,000) 19 (26) SR 8049, Bridge Ramp from SR 0065 20 Northbound to SR 0019, City of 21 Pittsburgh, Bridge Rehabilitation 2,850,000 22 (Base Construction Allocation - 23 $2,500,000) 24 (Land Allocation - $50,000) 25 (Design and Contingencies - $300,000) 26 (27) SR 8049, I-279 Bridge Ramp to SR 0065 27 Northbound, City of Pittsburgh, Bridge 28 Rehabilitation 1,730,000 29 (Base Construction Allocation - 30 $1,500,000) 19990S0504B0514 - 20 -
1 (Land Allocation - $30,000) 2 (Design and Contingencies - $200,000) 3 (28) SR 0030, Ardmore Boulevard Bridge 4 No.2 over Falls Run, North of SR 8012 5 Interchange, Forest Hills Borough, 6 Bridge Replacement 550,000 7 (Base Construction Allocation - 8 $400,000) 9 (Land Allocation - $50,000) 10 (Design and Contingencies - $100,000) 11 (29) SR 3004, McLaughlin Road Bridge over 12 McLaughlin Run, Bridgeville Borough, 13 Bridge Replacement 227,000 14 (Base Construction Allocation - 15 $177,000) 16 (Land Allocation - $10,000) 17 (Design and Contingencies - $40,000) 18 (30) SR 0028, Northbound Bridge over 19 Pennsylvania Turnpike, Harmar Township, 20 Bridge Rehabilitation 344,000 21 (Base Construction Allocation - 22 $314,000) 23 (Design and Contingencies - $30,000) 24 (31) SR 0028, Southbound Bridge over 25 Pennsylvania Turnpike, Harmar Township, 26 Bridge Rehabilitation 356,000 27 (Base Construction Allocation - 28 $325,000) 29 (Design and Contingencies - $31,000) 30 (32) SR 0028, Northbound Bridge over SR 19990S0504B0514 - 21 -
1 1028, Harrison Township, Bridge 2 Rehabilitation 106,000 3 (Base Construction Allocation - 4 $97,000) 5 (Design and Contingencies - $9,000) 6 (33) SR 0028, Southbound Bridge over SR 7 1028, Harrison Township, Bridge 8 Rehabilitation 105,000 9 (Base Construction Allocation - 10 $96,000) 11 (Design and Contingencies - $9,000) 12 (34) SR 0050, Washington Avenue Bridge 13 over Chartiers Creek, Bridgeville 14 Borough, Bridge Rehabilitation 119,000 15 (Base Construction Allocation - 16 $109,000) 17 (Design and Contingencies - $10,000) 18 (35) SR 0051, Clairton Boulevard Bridge 19 over Lewis Run, Pleasant Hills Borough, 20 Bridge Replacement 600,000 21 (Base Construction Allocation - 22 $500,000) 23 (Design and Contingencies - $100,000) 24 (36) SR 0065, Ohio River Boulevard Bridge 25 over Forest Avenue, Ben Avon Borough, 26 Bridge Replacement 396,000 27 (Base Construction Allocation - 28 $360,000) 29 (Design and Contingencies - $36,000) 30 (37) SR 0065, Bridge over Ramps, Railroad 19990S0504B0514 - 22 -
1 and Chateau Street, City of Pittsburgh, 2 Bridge Rehabilitation 13,284,000 3 (Base Construction Allocation - 4 $12,784,000) 5 (Design and Contingencies - $500,000) 6 (38) SR 0079, Neville Island Bridge over 7 Ohio River, Neville Township, Bridge 8 Rehabilitation 12,700,000 9 (Base Construction Allocation - 10 $11,200,000) 11 (Design and Contingencies - $1,500,000) 12 (39) SR 0088, Library Road Bridge No.1 13 over Piney Fork Creek, Bethel Park 14 Borough, Bridge Replacement 161,000 15 (Base Construction Allocation - 16 $128,000) 17 (Land Allocation - $20,000) 18 (Design and Contingencies - $13,000) 19 (40) SR 0088, Library Road Bridge No.2 20 over Branch of Piney Fork Creek, Bethel 21 Park Borough, Bridge Replacement 161,000 22 (Base Construction Allocation - 23 $128,000) 24 (Land Allocation - $20,000) 25 (Design and Contingencies - $13,000) 26 (41) SR 0885, Mifflin Road Bridge over 27 Branch of Streets Run, City of 28 Pittsburgh, Bridge Replacement 600,000 29 (Base Construction Allocation - 30 $500,000) 19990S0504B0514 - 23 -
1 (Design and Contingencies - $100,000) 2 (42) SR 0910, Gibsonia Road Bridge over 3 Rawlins Run, Indiana Township, Bridge 4 Deck Replacement 132,000 5 (Base Construction Allocation - 6 $120,000) 7 (Design and Contingencies - $12,000) 8 (43) SR 1027, Pleasantville Road Bridge 9 over Little Bull Creek, Harrison 10 Township, Bridge Replacement 400,000 11 (Base Construction Allocation - 12 $300,000) 13 (Design and Contingencies - $100,000) 14 (44) SR 1032, Burtner Road Bridge over 15 Little Bull Creek, Harrison Township, 16 Bridge Deck Replacement 198,000 17 (Base Construction Allocation - 18 $180,000) 19 (Design and Contingencies - $18,000) 20 (45) SR 2008, Lovedale Road Bridge over 21 Wylie Run Creek, Elizabeth Township, 22 Bridge Replacement 430,000 23 (Base Construction Allocation - 24 $300,000) 25 (Land Allocation - $30,000) 26 (Design and Contingencies - $100,000) 27 (46) SR 2017, Pineview Drive Bridge No.1 28 over Gillespie Run, Elizabeth Township, 29 Bridge Deck Replacement 255,000 30 (Base Construction Allocation - 19990S0504B0514 - 24 -
1 $135,000) 2 (Land Allocation - $20,000) 3 (Design and Contingencies - $100,000) 4 (47) SR 2017, Pineview Drive Bridge No.2 5 over Gillespie Run, Elizabeth Township, 6 Bridge Deck Replacement 243,000 7 (Base Construction Allocation - 8 $123,000) 9 (Land Allocation - $20,000) 10 (Design and Contingencies - $100,000) 11 (48) SR 2018, West Smithfield Road Bridge 12 over Unnamed Creek, Elizabeth Township, 13 Bridge Deck Replacement 218,000 14 (Base Construction Allocation - 15 $118,000) 16 (Design and Contingencies - $100,000) 17 (49) SR 2031, Lincoln Way Bridge over Long 18 Run, White Oak Borough, Bridge 19 Replacement 600,000 20 (Base Construction Allocation - 21 $500,000) 22 (Design and Contingencies - $100,000) 23 (50) SR 2051, Brinton Road Bridge over I- 24 376, Edgewood Borough, Bridge 25 Rehabilitation 996,000 26 (Base Construction Allocation - 27 $846,000) 28 (Design and Contingencies - $150,000) 29 (51) SR 4019, Mount Royal Boulevard Bridge 30 over Pine Creek, Hampton Township, 19990S0504B0514 - 25 -
1 Bridge Rehabilitation 94,000 2 (Base Construction Allocation - 3 $89,000) 4 (Design and Contingencies - $5,000) 5 (52) SR 4043, Big Sewickley Road Bridge 6 over Branch of Big Sewickley Creek, 7 Franklin Park Borough, Bridge 8 Replacement 84,000 9 (Base Construction Allocation - 10 $76,000) 11 (Design and Contingencies - $8,000) 12 (53) SR 8002, Crosstown Boulevard Bridge 13 over Forbes and Diamond Street and 14 Ramps, City of Pittsburgh, Bridge 15 Painting 310,000 16 (Base Construction Allocation - 17 $300,000) 18 (Design and Contingencies - $10,000) 19 (54) SR 8002, Ramp L Road Bridge over 20 Forbes and Diamond Streets, City of 21 Pittsburgh, Bridge Painting 110,000 22 (Base Construction Allocation - 23 $100,000) 24 (Design and Contingencies - $10,000) 25 (55) SR 8015, Ramp D Road Bridge over Ohio 26 River Back Channel, Neville Township, 27 Bridge Rehabilitation 800,000 28 (Base Construction Allocation - 29 $700,000) 30 (Design and Contingencies - $100,000) 19990S0504B0514 - 26 -
1 (56) SR 8015, Ramp E Road Bridge over PC&Y 2 Railroad, Neville Township, Bridge 3 Rehabilitation 670,000 4 (Base Construction Allocation - 5 $500,000) 6 (Design and Contingencies - $170,000) 7 (57) SR 8015, I-79 Ramp H Bridge over PC&Y 8 Railroad, Neville Township, Bridge 9 Rehabilitation 700,000 10 (Base Construction Allocation - 11 $600,000) 12 (Design and Contingencies - $100,000) 13 (58) SR 8015, Ramp J Road Bridge over 14 Neville Road, Neville Township, Bridge 15 Rehabilitation 220,000 16 (Base Construction Allocation - 17 $200,000) 18 (Design and Contingencies - $20,000) 19 (59) SR 8017, Ramp B2 Road Bridge over SR 20 4025 and SR 4033, Glenfield Borough, 21 Bridge Rehabilitation 110,000 22 (Base Construction Allocation - 23 $100,000) 24 (Design and Contingencies - $10,000) 25 (60) SR 8017, Ramp B Road Bridge over Ramp 26 A and SR 4033, Glenfield Borough, 27 Bridge Rehabilitation 120,000 28 (Base Construction Allocation - 29 $110,000) 30 (Design and Contingencies - $10,000) 19990S0504B0514 - 27 -
1 (61) SR 8017, Ramp B1 Road Bridge over SR 2 0065 Ramps A1 and R, Glenfield Borough, 3 Bridge Rehabilitation 165,000 4 (Base Construction Allocation - 5 $150,000) 6 (Design and Contingencies - $15,000) 7 (62) SR 8017, Ramp A Road Bridge over Ramp 8 B3, Glenfield Borough, Bridge 9 Rehabilitation 110,000 10 (Base Construction Allocation - 11 $100,000) 12 (Design and Contingencies - $10,000) 13 (63) SR 0028, Etna Bridges, Phase III, 14 Northbound Bridge No.4 to Existing SR 15 0028, Two Structures, Etna and 16 Sharpsburg Boroughs, Bridge 17 Rehabilitation 6,300,000 18 (Base Construction Allocation - 19 $6,000,000) 20 (Land Allocation - $300,000) 21 (64) SR 0028, Etna Bridge, Phase II, 22 Southbound Bridge No.3 and Northbound 23 Bridge for SR 0008 Connection, Etna and 24 Sharpsburg Boroughs and Shaler 25 Township, Bridge Rehabilitation 13,200,000 26 (Base Construction Allocation - 27 $12,200,000) 28 (Land Allocation - $1,000,000) 29 (65) SR 2013, Monessen-Elizabeth Road 30 Bridge over Becketts Run, Forward 19990S0504B0514 - 28 -
1 Township, Bridge Replacement 450,000 2 (Base Construction Allocation - 3 $300,000) 4 (Land Allocation - $50,000) 5 (Design and Contingencies - $100,000) 6 (66) SR 2016, Jefferson Heights Road 7 Bridge over I-376, Wilkins Township, 8 Bridge Reconstruction 1,600,000 9 (Base Construction Allocation - 10 $1,200,000) 11 (Design and Contingencies - $400,000) 12 (67) SR 0008, Bridge over Allegheny River 13 and Conrail, City of Pittsburgh, Bridge 14 Painting 333,000 15 (Base Construction Allocation - 16 $333,000) 17 (68) SR 0028, Allegheny Valley Expressway 18 Bridge, Southbound over Burtner Road, 19 Harrison Township, Bridge 20 Rehabilitation 170,000 21 (Base Construction Allocation - 22 $165,000) 23 (Design and Contingencies - $5,000) 24 (69) SR 0028, Allegheny Valley Expressway 25 Bridge, Northbound over Burtner Road, 26 Harrison Township, Bridge 27 Rehabilitation 320,000 28 (Base Construction Allocation - 29 $315,000) 30 (Design and Contingencies - $5,000) 19990S0504B0514 - 29 -
1 (70) SR 0028, Allegheny Valley Expressway 2 Bridge, Northbound over Bull Creek 3 Road, Tarentum Borough, Bridge 4 Rehabilitation 120,000 5 (Base Construction Allocation - 6 $115,000) 7 (Design and Contingencies - $5,000) 8 (71) SR 0028, Allegheny Valley Expressway 9 Bridge, Southbound over Bull Creek 10 Road, Tarentum Borough, Bridge 11 Rehabilitation 120,000 12 (Base Construction Allocation - 13 $115,000) 14 (Design and Contingencies - $5,000) 15 (72) SR 0028, Allegheny Valley Expressway, 16 Bridge over Scout Reservation Road, 17 Sharpesburg Borough, Bridge 18 Rehabilitation 1,000,000 19 (Base Construction Allocation - 20 $850,000) 21 (Design and Contingencies - $150,000) 22 (73) SR 0079, Glenfield Bridge over Ramp A 23 and SR 4033, Glenfield Borough, Bridge 24 Rehabilitation 748,000 25 (Base Construction Allocation - 26 $681,000) 27 (Design and Contingencies - $67,000) 28 (74) SR 0079, I-79 Bridge Northbound over 29 Turnpike, Marshall Township, Bridge 30 Painting 278,000 19990S0504B0514 - 30 -
1 (Base Construction Allocation - 2 $268,000) 3 (Design and Contingencies - $10,000) 4 (75) SR 0079, I-79 Bridge Southbound over 5 Turnpike, Marshall Township, Bridge 6 Painting 228,000 7 (Base Construction Allocation - 8 $218,000) 9 (Design and Contingencies - $10,000) 10 (76) SR 0079, I-79 Neville Island Bridge 11 over Ohio River, Neville Township, 12 Bridge Rehabilitation 12,945,000 13 (Base Construction Allocation - 14 $11,200,000) 15 (Land Allocation - $200,000) 16 (Design and Contingencies - $1,545,000) 17 (77) SR 0121, Greentree Road Bridge over 18 I-279, Parkway West, Greentree Borough, 19 Bridge Painting 192,000 20 (Base Construction Allocation - 21 $165,000) 22 (Land Allocation - $10,000) 23 (Design and Contingencies - $17,000) 24 (78) SR 0376, I-376 Bridge Eastbound over 25 Haymaker Road, Monroeville Borough, 26 Bridge Painting 266,000 27 (Base Construction Allocation - 28 $256,000) 29 (Design and Contingencies - $10,000) 30 (79) SR 0376, I-376 Bridge Westbound over 19990S0504B0514 - 31 -
1 Haymaker Road, Monroeville Borough, 2 Bridge Painting 155,000 3 (Base Construction Allocation - 4 $145,000) 5 (Design and Contingencies - $10,000) 6 (80) SR 0400, SR 0400, SR 4019 and SR 4042 7 Bridges, Structure Painting, Franklin 8 Park Borough, Hampton Township and 9 Pittsburgh, Bridge Painting 520,000 10 (Base Construction Allocation - 11 $500,000) 12 (Design and Contingencies - $20,000) 13 (81) SR 0366, Tarentum Bridge over 14 Allegheny River, Tarentum Borough, 15 Bridge Rehabilitation 4,105,000 16 (Base Construction Allocation - 17 $3,665,000) 18 (Design and Contingencies - $440,000) 19 (82) SR 0837, Eighth Avenue Bridge over 20 Baldwin Road, West Homestead Borough, 21 Bridge Replacement 2,529,000 22 (Base Construction Allocation - 23 $2,258,000) 24 (Design and Contingencies - $271,000) 25 (83) SR 3078, Burgettstown Road Bridge 26 over Potato Garden Road, Findley 27 Township, Bridge Replacement 148,000 28 (Base Construction Allocation - 29 $120,000) 30 (Land Allocation - $10,000) 19990S0504B0514 - 32 -
1 (Design and Contingencies - $18,000) 2 (84) SR 1010, Hart's Run Road Bridge over 3 Branch of Hart's Run, Hampton Township, 4 Bridge Replacement 520,000 5 (Base Construction Allocation - 6 $400,000) 7 (Land Allocation - $20,000) 8 (Design and Contingencies - $100,000) 9 (85) SR 1040, Bakerstown Road Bridge over 10 Route 28, Tarentum Borough, Bridge 11 Rehabilitation 275,000 12 (Base Construction Allocation - 13 $270,000) 14 (Design and Contingencies - $5,000) 15 (86) SR 2065, Thompson Run Road Bridge 16 over Union Railroad, Monroeville 17 Borough, Bridge Replacement 550,000 18 (Base Construction Allocation - 19 $500,000) 20 (Design and Contingencies - $50,000) 21 (87) SR 2074, Hulton Road Bridge over 22 Caldwell Run, Penn Hills, Bridge 23 Replacement 117,000 24 (Base Construction Allocation - 25 $84,000) 26 (Land Allocation - $20,000) 27 (Design and Contingencies - $13,000) 28 (88) SR 2080, Plum Avenue Bridge over Plum 29 Creek, Oakmont Borough, Bridge 30 Painting 109,000 19990S0504B0514 - 33 -
1 (Base Construction Allocation - 2 $99,000) 3 (Design and Contingencies - $10,000) 4 (89) SR 2082, Hulton Bridge over Conrail 5 and Allegheny River, Oakmont Borough 6 and Harmar Township, Bridge 7 Rehabilitation 550,000 8 (Base Construction Allocation - 9 $450,000) 10 (Design and Contingencies - $100,000) 11 (90) SR 2084, Milltown Road Bridge over 12 Plum Creek, Penn Hills, Bridge 13 Painting 31,000 14 (Base Construction Allocation - 15 $26,000) 16 (Design and Contingencies - $5,000) 17 (91) SR 2085, Birmingham Bridge over Mon 18 River, CSX Railroad, City of 19 Pittsburgh, Bridge Rehabilitation 1,455,000 20 (Base Construction Allocation - 21 $1,200,000) 22 (Land Allocation - $5,000) 23 (Design and Contingencies - $250,000) 24 (92) SR 2114, Bowman Avenue Bridge over SR 25 1066, RPS G & E, Cliff Street, City of 26 McKeesport, Bridge Rehabilitation 300,000 27 (Base Construction Allocation - 28 $260,000) 29 (Design and Contingencies - $40,000) 30 (93) SR 3005, Mayview Road Bridge over 19990S0504B0514 - 34 -
1 Branch Chartiers Creek, South Fayette 2 Township, Bridge Replacement 400,000 3 (Base Construction Allocation - 4 $320,000) 5 (Land Allocation - $20,000) 6 (Design and Contingencies - $60,000) 7 (94) SR 3007, Walton Road Bridge over 8 Branch of Lobbs Run, Jefferson Borough, 9 Bridge Replacement 93,000 10 (Base Construction Allocation - 11 $63,000) 12 (Land Allocation - $20,000) 13 (Design and Contingencies - $10,000) 14 (95) SR 3069, Liberty Bridge and Approach 15 Ramps, Six Structures, City of 16 Pittsburgh, Bridge Painting 1,000,000 17 (Base Construction Allocation - 18 $900,000) 19 (Design and Contingencies - $100,000) 20 (96) SR 3104, Bridge over Ohio River, City 21 of Pittsburgh, Bridge Painting 960,000 22 (Base Construction Allocation - 23 $950,000) 24 (Design and Contingencies - $10,000) 25 (97) SR 4003, McKnight Road Bridge over 26 Branch Pine Creek, Culvert Repair, 27 McCandless Township, Bridge 28 Replacement 978,000 29 (Base Construction Allocation - 30 $850,000) 19990S0504B0514 - 35 -
1 (Design and Contingencies - $128,000) 2 (98) SR 4025, Bridge over Ohio River, 3 Sewickley Borough, Bridge Painting 610,000 4 (Base Construction Allocation - 5 $600,000) 6 (Design and Contingencies - $10,000) 7 (99) SR 8037, Bridge and Ramp over Saw 8 Mill Run, City of Pittsburgh, Bridge 9 Painting 584,000 10 (Base Construction Allocation - 11 $564,000) 12 (Design and Contingencies - $20,000) 13 (100) SR 0279, Fort Pitt Bridge over 14 Monongahela River, City of Pittsburgh, 15 Bridge Rehabilitation 1,800,000 16 (Base Project Allocation - $1,800,000) 17 Section 7. Armstrong County. 18 (a) Local Bridges 19 (1) Boggs Township, T-850, Scrubgrass 20 Bridge over Scrubgrass Creek, Bridge 21 Rehabilitation 230,000 22 (Base Construction Allocation - 23 $170,000) 24 (Land Allocation - $10,000) 25 (Design and Contingencies - $50,000) 26 (2) Boggs Township, T-632, Scrubgrass 27 Bridge No.2 over Scrubgrass Creek, 28 Bridge Rehabilitation 185,000 29 (Base Construction Allocation - 30 $150,000) 19990S0504B0514 - 36 -
1 (Land Allocation - $10,000) 2 (Design and Contingencies - $25,000) 3 (3) Boggs Township, T-821, Pine Creek 4 Bridge over North Fork of Pine Creek, 5 Bridge Rehabilitation 140,000 6 (Base Construction Allocation - 7 $100,000) 8 (Land Allocation - $10,000) 9 (Design and Contingencies - $30,000) 10 (4) North Buffalo Township, T-300, Blaine 11 Bridge over Buffalo Creek, Bridge 12 Replacement 500,000 13 (Base Construction Allocation - 14 $400,000) 15 (Land Allocation - $20,000) 16 (Design and Contingencies - $80,000) 17 (5) North Buffalo Township, T-414, Church 18 Road Bridge over Stream, Bridge 19 Replacement 150,000 20 (Base Construction Allocation - 21 $100,000) 22 (Land Allocation - $10,000) 23 (Design and Contingencies - $40,000) 24 (6) West Kittanning Borough, T-759, Bridge 25 over Stream, Bridge Replacement 325,000 26 (Base Construction Allocation - 27 $265,000) 28 (Land Allocation - $10,000) 29 (Design and Contingencies - $50,000) 30 (7) Manorville Borough, Manorville 19990S0504B0514 - 37 -
1 Railroad Bridge along Former Conrail 2 Right-of-Way, Bridge Removal 65,000 3 (Base Construction Allocation - 4 $55,000) 5 (Design and Contingencies - $10,000) 6 (8) Pine Township, Templeton Bridge along 7 Former Conrail Right-of-Way, Bridge 8 Removal 75,000 9 (Base Construction Allocation - 10 $65,000) 11 (Design and Contingencies - $10,000) 12 (b) State Bridges 13 (1) SR 0028, Buffalo Creek Bridge over 14 Buffalo Creek and Conrail, South 15 Buffalo Township, Bridge Painting 3,010,000 16 (Base Construction Allocation - 17 $3,000,000) 18 (Design and Contingencies - $10,000) 19 (2) SR 3023, Iron Bridge Road, Pine Run 20 Bridge Replacement, South Buffalo 21 Township, Bridge Replacement 550,000 22 (Base Construction Allocation - 23 $510,000) 24 (Land Allocation - $20,000) 25 (Design and Contingencies - $20,000) 26 (3) SR 0156, Long Run Bridge over Long 27 Run, Kiskiminetas Township, Bridge 28 Painting 75,000 29 (Base Construction Allocation - 30 $60,000) 19990S0504B0514 - 38 -
1 (Design and Contingencies - $15,000) 2 (4) SR 0422, US 422 Eastbound Overpass 3 Bridge over SR 0028, East Franklin 4 Township, Bridge Painting 190,000 5 (Base Construction Allocation - 6 $175,000) 7 (Design and Contingencies - $15,000) 8 (5) SR 0422, US 422 Westbound Overpass 9 Bridge over SR 0028, East Franklin 10 Township, Bridge Painting 190,000 11 (Base Construction Allocation - 12 $175,000) 13 (Design and Contingencies - $15,000) 14 (6) SR 1028, Oscar Bridge over Pine Creek, 15 Boggs Township, Bridge Painting 95,000 16 (Base Construction Allocation - 17 $80,000) 18 (Design and Contingencies - $15,000) 19 (7) SR 0028, Buffalo Creek Bridge over 20 Buffalo Creek, South Buffalo Township, 21 Bridge Painting 1,730,000 22 (Base Construction Allocation - 23 $1,700,000) 24 (Design and Contingencies - $30,000) 25 (8) SR 0066, Guffy Run Bridge over Guffy 26 Run, Parks Township, Bridge Painting 85,000 27 (Base Construction Allocation - 28 $70,000) 29 (Design and Contingencies - $15,000) 30 (9) SR 0066, Garrett's Run Bridge over 19990S0504B0514 - 39 -
1 Garrett's Run and Old 66, Manor 2 Township, Bridge Painting 1,230,000 3 (Base Construction Allocation - 4 $1,200,000) 5 (Design and Contingencies - $30,000) 6 (10) SR 0128, Cadogan Bridge over 7 Tributary of Allegheny River, Cadogan 8 Township, Bridge Painting 380,000 9 (Base Construction Allocation - 10 $360,000) 11 (Design and Contingencies - $20,000) 12 (11) SR 0422, Judge Graff Bridge over 13 Allegheny River, North Buffalo 14 Township, Bridge Painting 2,930,000 15 (Base Construction Allocation - 16 $2,900,000) 17 (Design and Contingencies - $30,000) 18 (12) SR 0422, Ramp C and F Bridge over End 19 of Bypass, Manor Township, Bridge 20 Painting 180,000 21 (Base Construction Allocation - 22 $165,000) 23 (Design and Contingencies - $15,000) 24 (13) SR 0422, Ramp F Bridge over SR 0066, 25 Manor Township, Bridge Painting 190,000 26 (Base Construction Allocation - 27 $175,000) 28 (Design and Contingencies - $15,000) 29 (14) SR 1021, Eddyville Bridge over Pine 30 Run, Redbank Township, Bridge Painting 100,000 19990S0504B0514 - 40 -
1 (Base Construction Allocation - 2 $85,000) 3 (Design and Contingencies - $15,000) 4 (15) SR 1028, Bryan Bridge over Branch of 5 Pine Creek, Cowanshannock Township, 6 Bridge Painting 50,000 7 (Base Construction Allocation - 8 $35,000) 9 (Design and Contingencies - $15,000) 10 (16) SR 1034, Mosgrove Bridge over North 11 Fork of Pine Creek, Boggs Township, 12 Bridge Painting 65,000 13 (Base Construction Allocation - 14 $50,000) 15 (Design and Contingencies - $15,000) 16 (17) SR 1037, Echo Bridge over Pine Creek, 17 Wayne Township, Bridge Painting 85,000 18 (Base Construction Allocation - 19 $70,000) 20 (Design and Contingencies - $15,000) 21 (18) SR 2001, Rural Valley Bridge over 22 Cowanshannock Creek, Rural Valley 23 Borough, Bridge Painting 130,000 24 (Base Construction Allocation - 25 $115,000) 26 (Design and Contingencies - $15,000) 27 (19) SR 2005, Brick Church Bridge over 28 Branch of Cherry Run, Burrell Township, 29 Bridge Painting 75,000 30 (Base Construction Allocation - 19990S0504B0514 - 41 -
1 $60,000) 2 (Design and Contingencies - $15,000) 3 (20) SR 2005, Cherry Run Bridge over 4 Cherry Run, Plumcreek Township, Bridge 5 Painting 85,000 6 (Base Construction Allocation - 7 $70,000) 8 (Design and Contingencies - $15,000) 9 (21) SR 2005, Elgin Cemetery Bridge over 10 Cowanshannock Creek, Cowanshannock 11 Township, Bridge Painting 85,000 12 (Base Construction Allocation - 13 $70,000) 14 (Design and Contingencies - $15,000) 15 (22) SR 2010, Garrett's Run Bridge over 16 Garrett's Run, Manor Township, Bridge 17 Painting 75,000 18 (Base Construction Allocation - 19 $60,000) 20 (Design and Contingencies - $15,000) 21 (23) SR 2023, Wheel-in-Campground Bridge 22 over Plum Creek, Plumcreek Township, 23 Bridge Painting 125,000 24 (Base Construction Allocation - 25 $110,000) 26 (Design and Contingencies - $15,000) 27 (24) SR 2025, Garrett's Run Bridge No.1 28 over Garrett's Run, Manor Township, 29 Bridge Painting 80,000 30 (Base Construction Allocation - 19990S0504B0514 - 42 -
1 $65,000) 2 (Design and Contingencies - $15,000) 3 (25) SR 2025, Garrett's Run Bridge No.2 4 over Garrett's Run, Manor Township, 5 Bridge Painting 80,000 6 (Base Construction Allocation - 7 $65,000) 8 (Design and Contingencies - $15,000) 9 (26) SR 2025, Garrett's Run Bridge No.3 10 over Garrett's Run, Manor Township, 11 Bridge Painting 90,000 12 (Base Construction Allocation - 13 $75,000) 14 (Design and Contingencies - $15,000) 15 (27) SR 2027, Girty Bridge over Crooked 16 Creek, South Bend Township, Bridge 17 Painting 155,000 18 (Base Construction Allocation - 19 $140,000) 20 (Design and Contingencies - $15,000) 21 (28) SR 2029, Kelly's Station Road Bridge 22 over Taylor Run, Bethel Township, 23 Bridge Painting 60,000 24 (Base Construction Allocation - 25 $45,000) 26 (Design and Contingencies - $15,000) 27 (29) SR 2036, Stilt's Run Bridge over 28 Stilt's Run, Parks Township, Bridge 29 Painting 50,000 30 (Base Construction Allocation - 19990S0504B0514 - 43 -
1 $35,000) 2 (Design and Contingencies - $15,000) 3 (30) SR 2036, Carnahan Run Bridge over 4 Carnahan Run, Parks Township, Bridge 5 Painting 75,000 6 (Base Construction Allocation - 7 $60,000) 8 (Design and Contingencies - $15,000) 9 (31) SR 2050, Rattling Run Bridge over 10 Rattling Run, Kiskiminetas Township, 11 Bridge Painting 65,000 12 (Base Construction Allocation - 13 $50,000) 14 (Design and Contingencies - $15,000) 15 (32) SR 2051, Flat Run Bridge over Flat 16 Run, Kiskiminetas Township, Bridge 17 Painting 55,000 18 (Base Construction Allocation - 19 $40,000) 20 (Design and Contingencies - $15,000) 21 (33) SR 2051, Equitable Bridge over 22 Rattling Run, Kiskiminetas Township, 23 Bridge Painting 55,000 24 (Base Construction Allocation - 25 $40,000) 26 (Design and Contingencies - $15,000) 27 (34) SR 2057, Parks Pump Station Bridge 28 No.1 over Carnahan Run, Parks Township, 29 Bridge Painting 80,000 30 (Base Construction Allocation - 19990S0504B0514 - 44 -
1 $65,000) 2 (Design and Contingencies - $15,000) 3 (35) SR 2058, Parks Pump Station Bridge 4 No.2 over Carnahan Run, Parks Township, 5 Bridge Painting 75,000 6 (Base Construction Allocation - 7 $60,000) 8 (Design and Contingencies - $15,000) 9 (36) SR 3005, Glade Run Bridge over Glade 10 Run, North Buffalo Township, Bridge 11 Painting 75,000 12 (Base Construction Allocation - 13 $60,000) 14 (Design and Contingencies - $15,000) 15 (37) SR 3013, Little Buffalo Bridge over 16 Little Buffalo Creek, West Franklin 17 Township, Bridge Painting 100,000 18 (Base Construction Allocation - 19 $85,000) 20 (Design and Contingencies - $15,000) 21 (38) SR 3013, Harrigan Run Bridge over 22 Harrigan Run, West Franklin Township, 23 Bridge Painting 60,000 24 (Base Construction Allocation - 25 $45,000) 26 (Design and Contingencies - $15,000) 27 (39) SR 3017, West Penn Power Bridge over 28 SR 0422 and SR 0028, East Franklin 29 Township, Bridge Painting 375,000 30 (Base Construction Allocation - 19990S0504B0514 - 45 -
1 $360,000) 2 (Design and Contingencies - $15,000) 3 (40) SR 4007, Kaylor Bridge over Sugar 4 Creek, Bradys Bend Township, Bridge 5 Painting 60,000 6 (Base Construction Allocation - 7 $45,000) 8 (Design and Contingencies - $15,000) 9 (41) SR 4013, Foster Mills Bridge over 10 Branch of Patterson Run, Sugarcreek 11 Township, Bridge Painting 70,000 12 (Base Construction Allocation - 13 $55,000) 14 (Design and Contingencies - $15,000) 15 (42) SR 8008, Ford City Ramp from Judge 16 Graff Bridge over a ravine, Manor 17 Township, Bridge Painting 555,000 18 (Base Construction Allocation - 19 $540,000) 20 (Design and Contingencies - $15,000) 21 (43) SR 4035, Craigsville Bridge over 22 Buffalo Creek, West Franklin Township, 23 Bridge Painting 140,000 24 (Base Construction Allocation - 25 $125,000) 26 (Design and Contingencies - $15,000) 27 (44) SR 0068, Kaylor Overpass, Railroad 28 over PA 68, Bradys Bend Township, 29 Bridge Removal 560,000 30 (Base Construction Allocation - 19990S0504B0514 - 46 -
1 $500,000) 2 (Land Allocation - $10,000) 3 (Design and Contingencies - $50,000) 4 (45) SR 0068, B&LE Railroad Overpass, 5 Bradys Bend Township, Bridge Removal 55,000 6 (Base Construction Allocation - 7 $50,000) 8 (Design and Contingencies - $5,000) 9 (46) SR 0028, Pine Creek Bridge over Pine 10 Creek, Boggs Township, Bridge 11 Rehabilitation 1,450,000 12 (Base Construction Allocation - 13 $1,000,000) 14 (Land Allocation - $100,000) 15 (Design and Contingencies - $350,000) 16 (47) SR 0028, Big Glade Run Bridge over 17 Big Glade Run, North Buffalo Township, 18 Bridge Rehabilitation 1,450,000 19 (Base Construction Allocation - 20 $1,000,000) 21 (Land Allocation - $100,000) 22 (Design and Contingencies - $350,000) 23 (48) SR 0028, Cowanshannock Creek Bridge 24 over Cowanshannock Creek, Rayburn 25 Township, Bridge Rehabilitation 1,450,000 26 (Base Construction Allocation - 27 $1,000,000) 28 (Land Allocation - $100,000) 29 (Design and Contingencies - $350,000) 30 (49) SR 0028, Bridge over Branch of 19990S0504B0514 - 47 -
1 Cowanshannock Creek, Rayburn Township, 2 Bridge Rehabilitation 1,450,000 3 (Base Construction Allocation - 4 $1,000,000) 5 (Land Allocation - $100,000) 6 (Design and Contingencies - $350,000) 7 (50) SR 0028, Hays Run Bridge over Hays 8 Run, Rayburn Township, Bridge 9 Rehabilitation 1,450,000 10 (Base Construction Allocation - 11 $1,000,000) 12 (Land Allocation - $100,000) 13 (Design and Contingencies - $350,000) 14 (51) SR 0028, Furnace Run Bridge over 15 Furnace Run, South Buffalo Township, 16 Bridge Rehabilitation 1,450,000 17 (Base Construction Allocation - 18 $1,000,000) 19 (Land Allocation - $100,000) 20 (Design and Contingencies - $350,000) 21 (52) SR 0028, Pine Run Bridge over Pine 22 Run, South Buffalo Township, Bridge 23 Rehabilitation 1,450,000 24 (Base Construction Allocation - 25 $1,000,000) 26 (Land Allocation - $100,000) 27 (Design and Contingencies - $350,000) 28 (53) SR 0028, Bostonia Run Bridge over 29 Bostonia Run, South Buffalo Township, 30 Bridge Rehabilitation 1,450,000 19990S0504B0514 - 48 -
1 (Base Construction Allocation - 2 $1,000,000) 3 (Land Allocation - $100,000) 4 (Design and Contingencies - $350,000) 5 (54) SR 0028, Scrubgrass Creek Bridge over 6 Scrubgrass Creek, Wayne Township, 7 Bridge Rehabilitation 1,450,000 8 (Base Construction Allocation - 9 $1,000,000) 10 (Land Allocation - $100,000) 11 (Design and Contingencies - $350,000) 12 (55) SR 0210, South Bend Pump Station 13 Bridge over Crooked Creek, South Bend 14 Township, Bridge Rehabilitation 680,000 15 (Base Construction Allocation - 16 $600,000) 17 (Design and Contingencies - $80,000) 18 (56) SR 0268, B & P Railroad Overpass over 19 Railroad at Cowan Station, East 20 Franklin Township, Bridge Replacement 610,000 21 (Base Construction Allocation - 22 $500,000) 23 (Land Allocation - $40,000) 24 (Design and Contingencies - $70,000) 25 (57) SR 0268, Hovey Bridge over Small 26 Stream, Hovey Township, Bridge 27 Rehabilitation 1,050,000 28 (Base Construction Allocation - 29 $750,000) 30 (Land Allocation - $50,000) 19990S0504B0514 - 49 -
1 (Design and Contingencies - $250,000) 2 (58) SR 0268, Church Run Bridge over 3 Church Run, Parker City, Bridge 4 Rehabilitation 1,050,000 5 (Base Construction Allocation - 6 $750,000) 7 (Land Allocation - $50,000) 8 (Design and Contingencies - $250,000) 9 (59) SR 0268, Allison Run Bridge over 10 Allison Run, West Kittaning Township, 11 Bridge Rehabilitation 1,450,000 12 (Base Construction Allocation - 13 $1,000,000) 14 (Land Allocation - $100,000) 15 (Design and Contingencies - $350,000) 16 (60) SR 0422, Big Buffalo Creek Bridge 17 over Big Buffalo Creek, West Franklin 18 Township, Bridge Rehabilitation 1,050,000 19 (Base Construction Allocation - 20 $750,000) 21 (Land Allocation - $50,000) 22 (Design and Contingencies - $250,000) 23 (61) SR 1013, Oak Ridge Bridge over Branch 24 Redbank Creek, Redbank Township, Bridge 25 Deck Replacement 260,000 26 (Base Construction Allocation - 27 $200,000) 28 (Land Allocation - $10,000) 29 (Design and Contingencies - $50,000) 30 Section 8. Beaver County. 19990S0504B0514 - 50 -
1 (a) Local Bridges 2 (1) Ambridge and Aliquippa Boroughs, 3 Ambridge - Aliquippa Bridge over Ohio 4 River, Bridge Construction 38,000,000 5 (Base Construction Allocation - 6 $30,000,000) 7 (Land Allocation - $4,000,000) 8 (Design and Contingencies - $4,000,000) 9 (2) Vanport Township, Vanport Bridge No.6 10 over Two Mile Run, Bridge Replacement 465,000 11 (Base Construction Allocation - 12 $375,000) 13 (Land Allocation - $10,000) 14 (Design and Contingencies - $80,000) 15 (3) Vanport Township, Vanport Bridge No.7 16 over Two Mile Run, Bridge Replacement 470,000 17 (Base Construction Allocation - 18 $380,000) 19 (Land Allocation - $10,000) 20 (Design and Contingencies - $80,000) 21 (4) Vanport Township, Vanport Bridge No.8 22 over Two Mile Run, Bridge Replacement 510,000 23 (Base Construction Allocation - 24 $420,000) 25 (Land Allocation - $10,000) 26 (Design and Contingencies - $80,000) 27 (5) Vanport Township, Vanport Bridge No.9 28 over Two Mile Run, Bridge Replacement 440,000 29 (Base Construction Allocation - 30 $350,000) 19990S0504B0514 - 51 -
1 (Land Allocation - $10,000) 2 (Design and Contingencies - $80,000) 3 (6) Borough of New Galilee, Washington 4 Street Bridge over Jordan Run, Bridge 5 Replacement 1,000,000 6 (b) State Bridges 7 (1) SR 0051, Bridge over New York Avenue, 8 Ramp A, Rochester Borough, Bridge Deck 9 Replacement 5,600,000 10 (Base Construction Allocation - 11 $5,500,000) 12 (Design and Contingencies - $100,000) 13 (2) SR 0351, 5th Street, Koppel-Ellwood 14 Bridge over Beaver River, Koppel 15 Borough and North Sewickley Township, 16 Bridge Replacement, Phase I 33,500,000 17 (Base Construction Allocation - 18 $30,000,000) 19 (Land Allocation - $1,000,000) 20 (Design and Contingencies - $2,500,000) 21 (3) SR 1014, Wise's Grove Road Bridge over 22 Brush Creek, Marion Township, Bridge 23 Rehabilitation 750,000 24 (Base Construction Allocation - 25 $600,000) 26 (Land Allocation - $50,000) 27 (Design and Contingencies - $100,000) 28 (4) SR 1022, 13th Street Bridge over 29 Blockhouse Run at Pulaski County Line, 30 New Brighton Borough, Bridge 19990S0504B0514 - 52 -
1 Replacement 780,000 2 (Base Construction Allocation - 3 $480,000) 4 (Land Allocation - $50,000) 5 (Design and Contingencies - $250,000) 6 (5) SR 4032, Engle Road Bridge over Six 7 Mile Run Creek, Industry Borough, 8 Bridge Replacement 350,000 9 (Base Construction Allocation - 10 $200,000) 11 (Land Allocation - $50,000) 12 (Design and Contingencies - $100,000) 13 (6) SR 4033, Wildwood Road Bridge over 14 Brady's Run, Patterson Township, Bridge 15 Replacement 400,000 16 (Base Construction Allocation - 17 $250,000) 18 (Land Allocation - $50,000) 19 (Design and Contingencies - $100,000) 20 (7) SR 8035, Ramp A at LR 641 over Slope, 21 Rochester Borough, Bridge 22 Rehabilitation 1,200,000 23 (Base Construction Allocation - 24 $1,000,000) 25 (Land Allocation - $50,000) 26 (Design and Contingencies - $150,000) 27 (8) SR 8037, Ramp F over TR 51 and TR 65 28 Northbound, Rochester Borough, Bridge 29 Replacement 550,000 30 (Base Construction Allocation - 19990S0504B0514 - 53 -
1 $400,000) 2 (Land Allocation - $50,000) 3 (Design and Contingencies - $100,000) 4 (9) SR 8039, Ramp AD, SR 0168 over TR 51, 5 Bridgewater Borough, Bridge 6 Rehabilitation 700,000 7 (Base Construction Allocation - 8 $550,000) 9 (Land Allocation - $50,000) 10 (Design and Contingencies - $100,000) 11 (10) SR 3018, Culvert-pipe Style Bridge 12 over Moody's Run, Greene Township, 13 Bridge Construction 385,000 14 (Base Construction Allocation - 15 $350,000) 16 (Design and Contingencies - $35,000) 17 (11) SR 0051, Pennsylvania Avenue Bridge 18 over Brady's Run Creek, Fallston 19 Borough, Bridge Replacement 757,000 20 (Base Construction Allocation - 21 $637,000) 22 (Land Allocation - $20,000) 23 (Design and Contingencies - $100,000) 24 (12) SR 0060, Beaver Valley Extension 25 Southbound Bridge over T-535, Brighton 26 Township, Bridge Rehabilitation 167,000 27 (Base Construction Allocation - 28 $153,000) 29 (Design and Contingencies - $14,000) 30 (13) SR 0060, Beaver Valley Extension 19990S0504B0514 - 54 -
1 Northbound Bridge over T-535, Brighton 2 Township, Bridge Rehabilitation 178,000 3 (Base Construction Allocation - 4 $163,000) 5 (Design and Contingencies - $15,000) 6 (14) SR 0060, Beaver Valley Expansion 7 Bridge over SR 0151, Hopewell Township, 8 Bridge Deck Replacement 1,125,000 9 (Base Construction Allocation - 10 $1,000,000) 11 (Design and Contingencies - $125,000) 12 (15) SR 0588, Riverview Road Bridge over 13 Pine Run, Marion Township, Bridge 14 Replacement 250,000 15 (Base Construction Allocation - 16 $150,000) 17 (Design and Contingencies - $100,000) 18 (16) SR 1009, Hartzel Road Bridge over 19 Connoquenessing Creek, Marion Township, 20 Bridge Replacement 1,150,000 21 (Base Construction Allocation - 22 $1,000,000) 23 (Land Allocation - $50,000) 24 (Design and Contingencies - $100,000) 25 (17) SR 1016, Tatko Road Bridge over Brush 26 Creek, New Sewickley Township, Bridge 27 Replacement 420,000 28 (Base Construction Allocation - 29 $300,000) 30 (Land Allocation - $20,000) 19990S0504B0514 - 55 -
1 (Design and Contingencies - $100,000) 2 (18) SR 1032, New York Avenue Bridge over 3 Conrail, SR 1032 and Local Street, 4 Rochester Borough, Bridge 5 Rehabilitation 3,100,000 6 (Base Construction Allocation - 7 $3,000,000) 8 (Design and Contingencies - $100,000) 9 (19) SR 4035, Sebring Road Bridge over SR 10 0060, Brighton Township, Bridge 11 Rehabilitation 394,000 12 (Base Construction Allocation - 13 $361,000) 14 (Design and Contingencies - $33,000) 15 (20) SR 3032, Kendal Harshavile Road 16 Bridge over Branch of Traverse Creek, 17 Hanover Township, Bridge Replacement 250,000 18 (Base Construction Allocation - 19 $100,000) 20 (Land Allocation - $50,000) 21 (Design and Contingencies - $100,000) 22 (21) SR 4012, Brady's Run Bridge over 23 South Branch Brady's Run, Brighton 24 Township, Bridge Painting 32,000 25 (Base Construction Allocation - 26 $27,000) 27 (Design and Contingencies - $5,000) 28 (22) SR 4020, Dutch Ridge Road Bridge over 29 PA 60, Brighton Township, Bridge 30 Rehabilitation 500,000 19990S0504B0514 - 56 -
1 (Base Construction Allocation - 2 $350,000) 3 (Land Allocation - $50,000) 4 (Design and Contingencies - $100,000) 5 (23) SR 4032, Engle Road Bridge over Six 6 Mile Run, Industry Borough, Bridge 7 Painting 36,000 8 (Base Construction Allocation - 9 $31,000) 10 (Design and Contingencies - $5,000) 11 (24) SR 0060, Vanport Bridge over Ohio 12 River, Vanport Borough, Bridge 13 Painting 965,000 14 (Base Construction Allocation - 15 $950,000) 16 (Design and Contingencies - $15,000) 17 Section 9. Bedford County. 18 (a) Local Bridges 19 (1) Broad Top Township, T-550, Mosquito 20 Bridge over Six Mile Run, Bridge 21 Replacement 505,000 22 (Base Construction Allocation - 23 $400,000) 24 (Land Allocation - $10,000) 25 (Design and Contingencies - $95,000) 26 (2) Broad Top Township, T-553, Langdondale 27 Bridge over Sandy Run, Bridge 28 Replacement 395,000 29 (Base Construction Allocation - 30 $300,000) 19990S0504B0514 - 57 -
1 (Land Allocation - $10,000) 2 (Design and Contingencies - $85,000) 3 (3) Broad Top Township, T-583, Longs Run 4 Bridge over Longs Run, Bridge 5 Replacement 395,000 6 (Base Construction Allocation - 7 $300,000) 8 (Land Allocation - $10,000) 9 (Design and Contingencies - $85,000) 10 (4) Harrison Township, T-418, Turner 11 Covered Bridge over Juniata River, 12 Bridge Rehabilitation 825,000 13 (Base Construction Allocation - 14 $700,000) 15 (Land Allocation - $25,000) 16 (Design and Contingencies - $100,000) 17 (5) Monroe Township, T-354, Sideling Hill 18 over East Branch Sideling Hill Creek, 19 Bridge Replacement 335,000 20 (Base Construction Allocation - 21 $250,000) 22 (Land Allocation - $10,000) 23 (Design and Contingencies - $75,000) 24 (6) South Woodbury Township, T-705 over 25 Three Springs Run, Bridge Replacement 450,000 26 (Base Construction Allocation - 27 $325,000) 28 (Land Allocation - $50,000) 29 (Design and Contingencies - $75,000) 30 (7) West St. Clair Township, T-565 over 19990S0504B0514 - 58 -
1 Dunning Creek, Bridge Replacement 550,000 2 (Base Construction Allocation - 3 $450,000) 4 (Land Allocation - $25,000) 5 (Design and Contingencies - $75,000) 6 (8) Londonderry Township, T-653 over Wills 7 Creek, Bridge Replacement 945,000 8 (Base Construction Allocation - 9 $850,000) 10 (Land Allocation - $20,000) 11 (Design and Contingencies - $75,000) 12 (9) East Providence Township, T-419 over 13 Brush Creek, Bridge Replacement 1,170,000 14 (Base Construction Allocation - 15 $1,000,000) 16 (Land Allocation - $20,000) 17 (Design and Contingencies - $150,000) 18 (10) Broadtop Township, T-677, Riddlesburg 19 Bridge, County Bridge No.35 over Six 20 Mile Run, Bridge Replacement 190,000 21 (Base Construction Allocation - 22 $150,000) 23 (Land Allocation - $5,000) 24 Design and Contingencies - $35,000) 25 (11) Mann Township, T-319, County Bridge 26 No.27 over Sidling Hill Creek, Bridge 27 Replacement 620,000 28 (Base Construction Allocation - 29 $500,000) 30 (Land Allocation - $20,000) 19990S0504B0514 - 59 -
1 (Design and Contingencies - $100,000) 2 (12) Cumberland Valley Township, T-377 3 over Beaver's Run, Bridge Replacement 410,000 4 (Base Construction Allocation - 5 $325,000) 6 (Land Allocation - $5,000) 7 (Design and Contingencies - $80,000) 8 (13) Cumberland Valley Township, T-337 9 over Evitts Creek, Bridge Replacement 455,000 10 (Base Construction Allocation - 11 $370,000) 12 (Land Allocation - $5,000) 13 (Design and Contingencies - $80,000) 14 (14) Kimmell Township, County Bridge No.3 15 over Beaverdam Creek, Bridge 16 Replacement 490,000 17 (Base Construction Allocation - 18 $380,000) 19 (Land Allocation - $20,000) 20 (Design and Contingencies - $90,000) 21 (15) Hopewell Township, County Bridge No.4 22 over Yellow Creek, Bridge Replacement 970,000 23 (Base Construction Allocation - 24 $800,000) 25 (Land Allocation - $20,000) 26 (Design and Contingencies - $150,000) 27 (16) Colerain Township, Bridge No.2, 28 Bridge Replacement 445,000 29 (Base Construction Allocation - 30 $350,000) 19990S0504B0514 - 60 -
1 (Land Allocation - $5,000) 2 (Design and Contingencies - $90,000) 3 (17) Bedford Borough, Bridge No.1 over 4 Shober's Run, Bridge Replacement 800,000 5 (Base Construction Allocation - 6 $640,000) 7 (Land Allocation - $10,000) 8 (Design and Contingencies - $150,000) 9 (18) West St. Clair Township, Township 10 Bridge No.8 over Branch of Dunning 11 Creek, Bridge Replacement 480,000 12 (Base Construction Allocation - 13 $350,000) 14 (Land Allocation - $5,000) 15 (Design and Contingencies - $125,000) 16 (19) Londonderry Township, T-669, Gladden 17 Pike Bridge Over Gladden's Run, Bridge 18 Replacement 395,000 19 (Base Construction Allocation - 20 $300,000) 21 (Land Allocation - $85,000) 22 (Design and Contingencies - $10,000) 23 (b) State Bridges 24 (1) SR 0220, US 220, Northbound Bridge 25 over Pennsylvania Turnpike, Bedford 26 Township, Bridge Painting 180,000 27 (Base Construction Allocation - 28 $150,000) 29 (Design and Contingencies - $30,000) 30 (2) SR 0220, US 220, Southbound Bridge 19990S0504B0514 - 61 -
1 over Pennsylvania Turnpike, Bedford 2 Township, Bridge Painting 170,000 3 (Base Construction Allocation - 4 $140,000) 5 (Design and Contingencies - $30,000) 6 (3) SR 0869, Wallachs Bridge over Wallachs 7 Branch, Pavia Township, Bridge 8 Replacement 455,000 9 (Base Construction Allocation - 10 $325,000) 11 (Land Allocation - $25,000) 12 (Design and Contingencies - $105,000) 13 (4) SR 3019, Kegg Run Bridge over Kegg 14 Run, Juniata Township, Bridge 15 Replacement 655,000 16 (Base Construction Allocation - 17 $495,000) 18 (Land Allocation - $25,000) 19 (Design and Contingencies - $135,000) 20 (5) SR 2006, Sidling Hill Bridge over East 21 Branch Sidling Hill Creek, Monroe 22 Township, Bridge Replacement 750,000 23 (Base Construction Allocation - 24 $580,000) 25 (Land Allocation - $25,000) 26 (Design and Contingencies - $145,000) 27 Section 10. Berks County. 28 (a) Local Bridges 29 (1) City of Reading, Fritz Island Bridge 30 over Angelica Creek, Bridge 19990S0504B0514 - 62 -
1 Rehabilitation 23,000 2 (Base Construction Allocation - 3 $20,000) 4 (Design and Contingencies - $3,000) 5 (2) City of Reading, Bernadine Street over 6 Angelica Creek, Bridge Rehabilitation 175,000 7 (Base Construction Allocation - 8 $145,000) 9 (Design and Contingencies - $30,000) 10 (3) City of Reading, Tulpehocken Street 11 Footbridge, Bridge Rehabilitation 6,000 12 (Base Construction Allocation - $5,000) 13 (Design and Contingencies - $1,000) 14 (4) West Reading Borough, Museum Road over 15 Wyomissing Creek, Bridge 16 Rehabilitation 15,000 17 (Base Construction Allocation - 18 $12,000) 19 (Design and Contingencies - $3,000) 20 (5) Amity Township, Lake Drive over 21 Tributary of Schuylkill River, Bridge 22 Rehabilitation 86,000 23 (Base Construction Allocation - 24 $75,000) 25 (Design and Contingencies - $11,000) 26 (6) Amity Township, Browns Mill Road over 27 Spring Creek, Bridge Rehabilitation 6,000 28 (Base Construction Allocation - $5,000) 29 (Design and Contingencies - $1,000) 30 (7) Amity Township, Valley Road over 19990S0504B0514 - 63 -
1 Spring Creek, Bridge Rehabilitation 10,000 2 (Base Construction Allocation - $8,000) 3 (Design and Contingencies - $2,000) 4 (8) Amity Township, Monocacy Road over 5 Monocacy Creek, Bridge Rehabilitation 11,000 6 (Base Construction Allocation - $9,000) 7 (Design and Contingencies - $2,000) 8 (9) Bethel Township, T-492 over Little 9 Swatara Creek, Bridge Replacement 700,000 10 (Base Construction Allocation - 11 $500,000) 12 (Land Allocation - $50,000) 13 (Design and Contingencies - $150,000) 14 (10) Bethel Township, T-682 over Crosskill 15 Creek, Bridge Replacement 750,000 16 (Base Construction Allocation - 17 $550,000) 18 (Land Allocation - $50,000) 19 (Design and Contingencies - $150,000) 20 (11) Lenhartsville Borough, Penn Avenue 21 over Maiden Creek, Bridge Replacement 960,000 22 (Base Construction Allocation - 23 $750,000) 24 (Land Allocation - $10,000) 25 (Design and Contingencies - $200,000) 26 (12) Mohnton Borough, Main Street over 27 Wyomissing Creek, Bridge Replacement 750,000 28 (Base Construction Allocation - 29 $550,000) 30 (Land Allocation - $50,000) 19990S0504B0514 - 64 -
1 (Design and Contingencies - $150,000) 2 (13) Muhlenberg Township, Hain Avenue over 3 Laurel Run, Bridge Rehabilitation 100,000 4 (Base Construction Allocation - 5 $80,000) 6 (Design and Contingencies - $20,000) 7 (14) Oley Township, T-500 over Furnace 8 Creek, Bridge Replacement 700,000 9 (Base Construction Allocation - 10 $500,000) 11 (Land Allocation - $50,000) 12 (Design and Contingencies - $150,000) 13 (15) Robesonia Borough, Freeman Street 14 over Furnace Creek, Bridge Replacement 700,000 15 (Base Construction Allocation - 16 $500,000) 17 (Land Allocation - $50,000) 18 (Design and Contingencies - $150,000) 19 (16) Washington Township, T-884 over Swamp 20 Creek, Bridge Replacement 700,000 21 (Base Construction Allocation - 22 $500,000) 23 (Land Allocation - $50,000) 24 (Design and Contingencies - $150,000) 25 (17) Upper Bern Township, Mill Hill Road, 26 T-712 over Mill Creek, Bridge 27 Replacement 70,000 28 (Base Construction Allocation - 29 $40,000) 30 (Land Allocation - $10,000) 19990S0504B0514 - 65 -
1 (Design and Contingencies - $20,000) 2 (18) North Heidelberg Township, T-501, 3 Milestone Road Bridge over Tributary of 4 Spring Creek, Bridge Replacement 94,000 5 (Base Construction Allocation - 6 $82,000) 7 (Land Allocation - $4,000) 8 (Design and Contingencies - $8,000) 9 (19) Robeson Township, T-366, Bridge over 10 Allegheny Creek, Bridge Replacement 133,000 11 (Base Construction Allocation - 12 $117,000) 13 (Land Allocation - $5,000) 14 (Design and Contingencies - $11,000) 15 (b) State Bridges 16 (1) SR 0010, Reading Road over Tributary 17 of Conestoga Creek, Caernarvon 18 Township, Bridge Rehabilitation 775,000 19 (Base Construction Allocation - 20 $490,000) 21 (Land Allocation - $100,000) 22 (Design and Contingencies - $185,000) 23 (2) SR 0222, SR 0222 Northbound over SR 24 0737 Exit, Maxatawny Township, Bridge 25 Painting 45,000 26 (Base Construction Allocation - 27 $45,000) 28 (3) SR 0222, North Elm Street over SR 29 0222, Kutztown Borough, Bridge 30 Painting 45,000 19990S0504B0514 - 66 -
1 (Base Construction Allocation - 2 $45,000) 3 (4) SR 0222, SR 0222 Northbound over SR 4 8015, Ramp G, Maxatawny Township, 5 Bridge Painting 45,000 6 (Base Construction Allocation - 7 $45,000) 8 (5) SR 0222, SR 0222 Southbound over SR 9 8015, Ramp G, Maxatawny Township, 10 Bridge Painting 45,000 11 (Base Construction Allocation - 12 $45,000) 13 (6) SR 2038, Grist Mill Road over 14 Ironstone Creek, Douglass Township, 15 Bridge Replacement 405,000 16 (Base Construction Allocation - 17 $235,000) 18 (Land Allocation - $70,000) 19 (Design and Contingencies - $100,000) 20 (7) SR 0073, Bridge over Railroad, Maiden 21 Creek Township, Bridge Rehabilitation 14,000 22 (Base Construction Allocation - 23 $12,000) 24 (Design and Contingencies - $2,000) 25 (8) SR 2014, Spring Street Subway, City of 26 Reading, Bridge Rehabilitation 18,000 27 (Base Construction Allocation - 28 $15,000) 29 (Design and Contingencies - $3,000) 30 (9) SR 0073, SR 0073 over Manatawny Creek, 19990S0504B0514 - 67 -
1 Oley Township, Bridge Rehabilitation 500,000 2 (Base Construction Allocation - 3 $450,000) 4 (Design and Contingencies - $50,000) 5 (10) SR 0061, SR 0061 over Blue Mountain 6 Railroad, Borough of Hamburg, Bridge 7 Rehabilitation 200,000 8 (Base Construction Allocation - 9 $175,000) 10 (Design and Contingencies - $25,000) 11 (11) SR 0078, SR 0078 over SR 1024, 12 Greenwich Township, Bridge 13 Rehabilitation 500,000 14 (Base Construction Allocation - 15 $450,000) 16 (Design and Contingencies - $50,000) 17 (12) SR 0078, SR 0078 over T-808, Windsor 18 Township, Bridge Rehabilitation 500,000 19 (Base Construction Allocation - 20 $450,000) 21 (Design and Contingencies - $50,000) 22 (13) SR 0078, SR 0078 over Fifth Street, 23 Borough of Hamburg, Bridge 24 Rehabilitation 200,000 25 (Base Construction Allocation - 26 $175,000) 27 (Design and Contingencies - $25,000) 28 (14) SR 0078, SR 0078 over T-688, Bethel 29 Township, Bridge Rehabilitation 250,000 30 (Base Construction Allocation - 19990S0504B0514 - 68 -
1 $225,000) 2 (Design and Contingencies - $25,000) 3 (15) SR 0176, SR 0176 over T-568, Robeson 4 Township, Bridge Rehabilitation 250,000 5 (Base Construction Allocation - 6 $200,000) 7 (Design and Contingencies - $50,000) 8 (16) SR 0176, SR 0176 2/10 mile south of 9 SR 0422, Cumru Township, Bridge 10 Rehabilitation 350,000 11 (Base Construction Allocation - 12 $300,000) 13 (Design and Contingencies - $50,000) 14 (17) SR 1083, SR 0183 over Little 15 Northkill Creek, Jefferson Township, 16 Bridge Replacement 1,000,000 17 (Base Construction Allocation - 18 $750,000) 19 (Land Allocation - $100,000) 20 (Design and Contingencies - $150,000) 21 (18) SR 0222, SR 0222 over Abandoned 22 Railroad, City of Reading, Bridge 23 Rehabilitation 200,000 24 (Base Construction Allocation - 25 $150,000) 26 (Design and Contingencies - $50,000) 27 (19) SR 0422, SR 0422 over Tulpehocken 28 Creek, Borough of Womelsdorf, Bridge 29 Rehabilitation 200,000 30 (Base Construction Allocation - 19990S0504B0514 - 69 -
1 $150,000) 2 (Design and Contingencies - $50,000) 3 (20) SR 0568, SR 0568 over Allegheny 4 Creek, Robeson Township, Bridge 5 Rehabilitation 100,000 6 (Base Construction Allocation - 7 $80,000) 8 (Design and Contingencies - $20,000) 9 (21) SR 0737, SR 0737 2.63 miles north of 10 Kutztown, Greenwich Township, Bridge 11 Rehabilitation 500,000 12 (Base Construction Allocation - 13 $450,000) 14 (Design and Contingencies - $50,000) 15 (22) SR 0737, SR 0737 2.82 miles north of 16 Kutztown, Greenwich Township, Bridge 17 Rehabilitation 500,000 18 (Base Construction Allocation - 19 $450,000) 20 (Design and Contingencies - $50,000) 21 (23) SR 2025, SR 2025 1/2 mile east of SR 22 0422, Amity Township, Bridge 23 Replacement 300,000 24 (Base Construction Allocation - 25 $200,000) 26 (Land Allocation - $15,000) 27 (Design and Contingencies - $85,000) 28 (24) SR 2031, SR 2031 over Hay Creek, 29 Robeson Township, Bridge 30 Rehabilitation 500,000 19990S0504B0514 - 70 -
1 (Base Construction Allocation - 2 $450,000) 3 (Design and Contingencies - $50,000) 4 (25) SR 2032, SR 2032 over Tributary of 5 Swamp Creek, Washington Township, 6 Bridge Replacement 500,000 7 (Base Construction Allocation - 8 $375,000) 9 (Land Allocation - $25,000) 10 (Design and Contingencies - $100,000) 11 (26) SR 2039, SR 2039 over SR 0422, Exeter 12 Township, Bridge Replacement 2,750,000 13 (Base Construction Allocation - 14 $2,000,000) 15 (Land Allocation - $250,000) 16 (Design and Contingencies - $500,000) 17 (27) SR 2041, SR 2041 2 miles west of 18 Weavertown, Amity Township, Bridge 19 Replacement 200,000 20 (Base Construction Allocation - 21 $125,000) 22 (Land Allocation - $15,000) 23 (Design and Contingencies - $60,000) 24 (28) SR 2057, SR 2057 over Leaf Creek, 25 Amity Township, Bridge Replacement 600,000 26 (Base Construction Allocation - 27 $425,000) 28 (Land Allocation - $25,000) 29 (Design and Contingencies - $150,000) 30 (29) SR 3003, SR 3003 over Angelica Creek, 19990S0504B0514 - 71 -
1 Cumru Township, Bridge Replacement 200,000 2 (Base Construction Allocation - 3 $125,000) 4 (Land Allocation - $15,000) 5 (Design and Contingencies - $60,000) 6 (30) SR 4026, SR 4026 over Irish Creek, 7 Borough of Centerport, Bridge 8 Rehabilitation 250,000 9 (Base Construction Allocation - 10 $225,000) 11 (Design and Contingencies - $25,000) 12 (31) SR 0073, Bridge over Maiden Creek, 13 Ontelaunee Township, Bridge 14 Replacement 2,120,000 15 (Base Construction Allocation - 16 $2,000,000) 17 (Land Allocation - $20,000) 18 (Design and Contingencies - $100,000) 19 (32) SR 2021, Mineral Spring Road, 20 Lindbergh Viaduct, City of Reading, 21 Bridge Rehabilitation 4,000,000 22 (33) SR 0222, US 222 Bridge Painting, 23 Seven Structures, Kutztown, West 24 Reading and Maxatawny, Bridge Painting 1,000,000 25 (Base Construction Allocation - 26 $1,000,000) 27 (34) SR 0422, Reading Bypass Bridges over 28 Schuylkill River and US 222, Six Bridge 29 Rehabilitations with Latex, City of 30 Reading, Bridge Deck Rehabilitation 5,050,000 19990S0504B0514 - 72 -
1 (Base Construction Allocation - 2 $5,000,000) 3 (Design and Contingencies - $50,000) 4 Section 11. Blair County. 5 (a) Local Bridges 6 (1) Antis Township, T-490, Becker Road 7 Bridge over Tributary of Little Juniata 8 River, Bridge Replacement 310,000 9 (Base Construction Allocation - 10 $250,000) 11 (Land Allocation - $10,000) 12 (Design and Contingencies - $50,000) 13 (2) Taylor Township, T-332, Halter Creek 14 Bridge over Halter Creek, Bridge 15 Replacement 395,000 16 (Base Construction Allocation - 17 $300,000) 18 (Land Allocation - $10,000) 19 (Design and Contingencies - $85,000) 20 (3) Greenfield Township, T-531 over South 21 Poplar Run, Construct new bridge 280,000 22 (Base Construction Allocation - 23 $200,000) 24 (Land Allocation - $20,000) 25 (Design and Contingencies - $60,000) 26 (4) Greenfield Township, T-531 over Big 27 Lick Branch of South Poplar Run, Bridge 28 Replacement 565,000 29 (Base Construction Allocation - 30 $465,000) 19990S0504B0514 - 73 -
1 (Land Allocation - $30,000) 2 (Design and Contingencies - $70,000) 3 (5) Greenfield Township, County Road 101 4 over Polecat Run, Bridge Replacement 520,000 5 (Base Construction Allocation - 6 $400,000) 7 (Land Allocation - $20,000) 8 (Design and Contingencies - $100,000) 9 (6) Newry Borough, Allegheny Street over 10 Tributary of Poplar Run, Bridge 11 Rehabilitation 425,000 12 (Base Construction Allocation - 13 $350,000) 14 (Land Allocation - $25,000) 15 (Design and Contingencies - $50,000) 16 (7) Allegheny Township, Ellenberger Road, 17 Quarry Bridge over Mill Run Creek, 18 Bridge Replacement 319,000 19 (Base Construction Allocation - 20 $277,000) 21 (Design and Contingencies - $42,000) 22 (8) City of Altoona, Beale Avenue, Bridge 23 over Mill Run Creek, Bridge 24 Replacement 380,000 25 (Base Construction Allocation - 26 $330,000) 27 (Design and Contingencies - $50,000) 28 (9) City of Altoona, Broad Avenue, Bridge 29 over Mill Run Creek, Bridge 30 Replacement 317,000 19990S0504B0514 - 74 -
1 (Base Construction Allocation - 2 $275,000) 3 (Design and Contingencies - $42,000) 4 (10) City of Altoona, Hite Company Access, 5 Bridge over Mill Run Creek, Bridge 6 Replacement 118,000 7 (Base Construction Allocation - 8 $101,000) 9 (Design and Contingencies - $17,000) 10 (11) City of Altoona, 31st Street, Conrail 11 No.1 Bridge over Mill Run Creek, Bridge 12 Replacement 160,000 13 (Base Construction Allocation - 14 $139,000) 15 (Design and Contingencies - $21,000) 16 (12) City of Altoona, West Chestnut 17 Avenue, Bridge over Mill Run Creek, 18 Bridge Replacement 285,000 19 (Base Construction Allocation - 20 $248,000) 21 (Design and Contingencies - $37,000) 22 (13) City of Altoona, Spruce Avenue, 23 Bridge over Mill Run Creek, Bridge 24 Replacement 285,000 25 (Base Construction Allocation - 26 $248,000) 27 (Design and Contingencies - $37,000) 28 (14) City of Altoona, Coleridge Avenue, 29 Bridge over Mill Run Creek, Bridge 30 Replacement 570,000 19990S0504B0514 - 75 -
1 (Base Construction Allocation - 2 $495,000) 3 (Design and Contingencies - $75,000) 4 (b) State bridges 5 (1) SR 0022, Canal Park Bridges over the 6 Juniata River, Hollidaysburg Borough, 7 Bridge Replacement 3,000,000 8 (Base Construction Allocation - 9 $2,000,000) 10 (Land Allocation - $650,000) 11 (Design and Contingencies - $350,000) 12 (2) SR 4008, SR 4008 over Tributary of 13 Glenwhite Run, Logan Township, Bridge 14 Replacement 240,000 15 (Base Construction Allocation - 16 $200,000) 17 (Land Allocation - $5,000) 18 (Design and Contingencies - $35,000) 19 (3) SR 4004, 58th Street Bridge over Mill 20 Run Creek, City of Altoona, Bridge 21 Replacement 598,000 22 (Base Construction Allocation - 23 $520,000) 24 (Design and Contingencies - $78,000) 25 (4) SR 4003, Logan Boulevard Bridge over 26 Mill Run Creek, City of Altoona, Bridge 27 Replacement 1,438,000 28 (Base Construction Allocation - 29 $1,250,000) 30 (Design and Contingencies - $188,000) 19990S0504B0514 - 76 -
1 (5) SR 0036, Union Avenue Bridge over Mill 2 Run Creek, City of Altoona, Bridge 3 Replacement 770,000 4 (Base Construction Allocation - 5 $670,000) 6 (Design and Contingencies - $100,000) 7 Section 12. Bradford County. 8 (a) Local Bridges 9 (1) Burlington Township, T-547 over Wallis 10 Run, Bridge Replacement 395,000 11 (Base Construction Allocation - 12 $310,000) 13 (Land Allocation - $10,000) 14 (Design and Contingencies - $75,000) 15 (2) Pike Township, T-790 over Gaylord 16 Creek and South Creek, Bridge 17 Replacement 495,000 18 (Base Construction Allocation - 19 $410,000) 20 (Land Allocation - $10,000) 21 (Design and Contingencies - $75,000) 22 (3) Canton Township, T-889, County Bridge 23 No.45 over Towanda Creek, Bridge 24 Replacement 480,000 25 (Base Construction Allocation - 26 $400,000) 27 (Land Allocation - $25,000) 28 (Design and Contingencies - $55,000) 29 (4) Tuscarora Township, T-874, County 30 Bridge No.36 over Fargo Creek, Bridge 19990S0504B0514 - 77 -
1 Replacement 265,000 2 (Base Construction Allocation - 3 $215,000) 4 (Land Allocation - $15,000) 5 (Design and Contingencies - $35,000) 6 (5) Franklin Township, T-358, County 7 Bridge No.12 over Towanda Creek, Bridge 8 Replacement 1,020,000 9 (Base Construction Allocation - 10 $850,000) 11 (Land Allocation - $50,000) 12 (Design and Contingencies - $120,000) 13 (6) Litchfield Township, T-900, Parks 14 Creek Structure Bridge over Parks 15 Creek, Bridge Replacement 390,000 16 (Base Construction Allocation - 17 $220,000) 18 (Land Allocation - $20,000) 19 (Design and Contingencies - $150,000) 20 (7) Albany Township, T-377, Bridge over 21 Bowman Creek 390,000 22 (Base Construction Allocation - 23 $250,000) 24 (Land Allocation - $10,000) 25 (Design and Contingencies - $130,000) 26 (8) Towanda Township, T-545, Bridge over 27 Sugar Creek, Bridge Replacement 1,247,000 28 (Base Construction Allocation - 29 $1,033,000) 30 (Land Allocation - $65,000) 19990S0504B0514 - 78 -
1 (Design and Contingencies - $149,000) 2 (9) Wells Township, T-763, Bridge over 3 Seely Creek, Bridge Replacement 428,000 4 (Base Construction Allocation - 5 $355,000) 6 (Land Allocation - $22,000) 7 (Design and Contingencies - $51,000) 8 (10) Terry Township, T-420, Bridge over 9 Foster Branch of Sugar Creek, Bridge 10 Replacement 663,000 11 (Base Construction Allocation - 12 $550,000) 13 (Land Allocation - $33,000) 14 (Design and Contingencies - $80,000) 15 (11) Canton Township, T-889, County Bridge 16 No.45 over Towanda Creek, Bridge 17 Replacement 480,000 18 (Base Construction Allocation - 19 $400,000) 20 (Land Allocation - $25,000) 21 (Design and Contingencies - $55,000) 22 (12) Tuscarora Township, T-874, County 23 Bridge No.36 over Fargo Creek, Bridge 24 Replacement 265,000 25 (Base Construction Allocation - 26 $215,000) 27 (Land Allocation - $15,000) 28 (Design and Contingencies - $35,000) 29 (13) Franklin Township, T-358, County 30 Bridge No.12 over Towanda Creek, Bridge 19990S0504B0514 - 79 -
1 Replacement 1,020,000 2 (Base Construction Allocation - 3 $850,000) 4 (Land Allocation - $50,000) 5 (Design and Contingencies - $120,000) 6 (14) Litchfield Township, T-900 over Parks 7 Creek, Parks Creek Structure Bridge, 8 Bridge Replacement 390,000 9 (Base Construction Allocation - 10 $220,000) 11 (Land Allocation - $20,000) 12 (Design and Contingencies - $150,000) 13 (15) Albany Township, T-381, County Bridge 14 No.2 over South Branch of Towanda 15 Creek, Bridge Replacement 550,000 16 (Base Construction Allocation - 17 $495,000) 18 (Design and Contingencies - $55,000) 19 (16) Monroe Township, T-412, County Bridge 20 No.20 over South Branch of Towanda 21 Creek, Bridge Replacement 700,000 22 (Base Construction Allocation - 23 $630,000) 24 (Design and Contingencies - $70,000) 25 (b) State Bridges 26 (1) SR 0006, North Bridge over Sugar 27 Creek, South of Longs Pond Road, Bridge 28 Replacement 1,139,000 29 (Base Construction Allocation - 30 $911,000) 19990S0504B0514 - 80 -
1 (Land Allocation - $57,000) 2 (Design and Contingencies - $171,000) 3 (2) SR 0409, Billing Creek Bridge, Village 4 of Camptown, Bridge Replacement 318,000 5 (Base Construction Allocation - 6 $254,000) 7 (Land Allocation - $16,000) 8 (Design and Contingencies - $48,000) 9 (3) SR 3029, Towanda Creek Bridges between 10 T-327 and T-326 on Gulf Road, Village 11 of Granville Center, Bridge 12 Replacement 593,000 13 (Base Construction Allocation - 14 $474,000) 15 (Land Allocation - $30,000) 16 (Design and Contingencies - $89,000) 17 (4) SR 4008, Bridge over Tributary of 18 Sugar Creek, Columbia Township, Bridge 19 Replacement 298,000 20 (Base Construction Allocation - 21 $238,000) 22 (Land Allocation - $15,000) 23 (Design and Contingencies - $45,000) 24 (5) SR 0414, Bridge over Towanda Creek, 25 Bradford Borough, Bridge Painting 195,000 26 (Base Construction Allocation - 27 $185,000) 28 (Design and Contingencies - $10,000) 29 (6) US 6, US 6 over Sugar Creek, Sylvania 30 Borough, Bridge Replacement 633,000 19990S0504B0514 - 81 -
1 (Base Construction Allocation - 2 $506,000) 3 (Land Allocation - $32,000) 4 (Design and Contingencies - $95,000) 5 (7) SR 0014, SR 0014 over Tributary of 6 Sugar Creek, Troy Township, Bridge 7 Replacement 410,000 8 (Base Construction Allocation - 9 $280,000) 10 (Land Allocation - $30,000) 11 (Design and Contingencies - $100,000) 12 (8) SR 0187, SR 0187 over Wappasening 13 Creek, Windham Township, Bridge 14 Replacement 2,000,000 15 (Base Construction Allocation - 16 $1,600,000) 17 (Land Allocation - $100,000) 18 (Design and Contingencies - $300,000) 19 (9) SR 0414, SR 0414 over Tributary of 20 Towanda Creek, Canton Township, Bridge 21 Replacement 320,000 22 (Base Construction Allocation - 23 $256,000) 24 (Land Allocation - $16,000) 25 (Design and Contingencies - $48,000) 26 (10) SR 0467, SR 0467 over Johnsons Creek, 27 Orwell Township, Bridge Replacement 751,000 28 (Base Construction Allocation - 29 $601,000) 30 (Land Allocation - $37,000) 19990S0504B0514 - 82 -
1 (Design and Contingencies - $113,000) 2 (11) SR 0514, SR 0514 over North Branch of 3 Towanda Creek, Granville Township, 4 Bridge Replacement 638,000 5 (Base Construction Allocation - 6 $510,000) 7 (Land Allocation - $32,000) 8 (Design and Contingencies - $96,000) 9 (12) SR 1022, Ulster Bridge, Ulster 10 Township, Bridge Painting 6,299,000 11 (Base Construction Allocation - 12 $5,039,000) 13 (Land Allocation - $315,000) 14 (Design and Contingencies - $945,000) 15 (13) SR 1026, SR 1026 over Wyalusing 16 Creek, Pike Township, Bridge 17 Replacement 650,000 18 (Base Construction Allocation - 19 $520,000) 20 (Land Allocation - $30,000) 21 (Design and Contingencies - $100,000) 22 (14) SR 1049, SR 1049 over Tributary of 23 Pendleton Creek, Warren Township, 24 Bridge Replacement 340,000 25 (Base Construction Allocation - 26 $270,000) 27 (Land Allocation - $15,000) 28 (Design and Contingencies - $55,000) 29 (15) SR 1055, SR 1055 over Parks Creek, 30 Rome Township, Bridge Replacement 315,000 19990S0504B0514 - 83 -
1 (Base Construction Allocation - 2 $250,000) 3 (Land Allocation - $15,000) 4 (Design and Contingencies - $50,000) 5 (16) SR 2018, SR 2018 over Tributary of 6 Susquehanna River, Asylum Township, 7 Bridge Replacement 260,000 8 (Base Construction Allocation - 9 $208,000) 10 (Land Allocation - $39,000) 11 (Design and Contingencies - $13,000) 12 (17) SR 3005, SR 3005 over Towanda Creek, 13 Canton Township, Bridge Replacement 666,000 14 (Base Construction Allocation - 15 $533,000) 16 (Land Allocation - $33,000) 17 (Design and Contingencies - $100,000) 18 (18) SR 3029, SR 3029 over Mud Creek, Troy 19 Township, Bridge Replacement 457,000 20 (Base Construction Allocation - 21 $366,000) 22 (Land Allocation - $23,000) 23 (Design and Contingencies - $68,000) 24 (19) SR 4002, SR 4002 over Browns Creek, 25 Burlington Township, Bridge 26 Replacement 561,000 27 (Base Construction Allocation - 28 $449,000) 29 (Land Allocation - $28,000) 30 (Design and Contingencies - $84,000) 19990S0504B0514 - 84 -
1 (20) SR 4013, SR 4013 over Justice Run, 2 Ridgebury Township, Bridge Replacement 351,000 3 (Base Construction Allocation - 4 $281,000) 5 (Land Allocation - $18,000) 6 (Design and Contingencies - $52,000) 7 (21) SR 4014, SR 4014 over Branch of 8 Tomjack Creek, Smithfield Township, 9 Bridge Replacement 360,000 10 (Base Construction Allocation - 11 $288,000) 12 (Land Allocation - $18,000) 13 (Design and Contingencies - $54,000) 14 (22) SR 4015, SR 4015 over Mill Creek, 15 Springfield Township, Bridge 16 Replacement 390,000 17 (Base Construction Allocation - 18 $312,000) 19 (Land Allocation - $20,000) 20 (Design and Contingencies - $58,000) 21 (23) SR 4031, SR 4031 over Tributary of 22 Beckwith Creek, Wells Township, Bridge 23 Replacement 243,000 24 (Base Construction Allocation - 25 $196,000) 26 (Land Allocation - $10,000) 27 (Design and Contingencies - $37,000) 28 (24) SR 2024, Bridge over Towanda Creek, 29 Towanda Township, Bridge Replacement 1,740,000 30 (Base Construction Allocation - 19990S0504B0514 - 85 -
1 $1,400,000) 2 (Land Allocation - $40,000) 3 (Design and Contingencies - $300,000) 4 (25) SR 4015, Bridge over Mill Creek, 5 Springfield Township, Bridge 6 Replacement 740,000 7 (Base Construction Allocation - 8 $600,000) 9 (Land Allocation - $20,000) 10 (Design and Contingencies - $120,000) 11 (26) PA 514, Bridge over North Branch of 12 Towanda Creek, Granville Township, 13 Bridge Replacement 630,000 14 (Base Construction Allocation - 15 $500,000) 16 (Land Allocation - $30,000) 17 (Design and Contingencies - $100,000) 18 (27) US 6, Bridge over Sugar Creek, 19 Sylvania Borough, Bridge Replacement 680,000 20 (Base Construction Allocation - 21 $550,000) 22 (Land Allocation - $30,000) 23 (Design and Contingencies - $100,000) 24 (28) PA 549, Bridge over Daggett Creek, 25 Wells Township, Bridge Replacement 1,180,000 26 (Base Construction Allocation - 27 $950,000) 28 (Land Allocation - $30,000) 29 (Design and Contingencies - $200,000) 30 (29) SR 4002, Bridge over Browns Creek, 19990S0504B0514 - 86 -
1 Burlington Township, Bridge 2 Replacement 560,000 3 (Base Construction Allocation - 4 $450,000) 5 (Land Allocation - $30,000) 6 (Design and Contingencies - $80,000) 7 (30) SR 1026, Bridge over Wyalusing Creek, 8 Pike Township, Bridge Replacement 650,000 9 (Base Construction Allocation - 10 $520,000) 11 (Land Allocation - $30,000) 12 (Design and Contingencies - $100,000) 13 (31) PA 187, Bridge over Wappasening 14 Creek, Windham Township, Bridge 15 Replacement 2,000,000 16 (Base Construction Allocation - 17 $1,600,000) 18 (Land Allocation - $100,000) 19 (Design and Contingencies - $300,000) 20 (32) PA 199, Bridge over Chemung River 21 Overflow Channel, Athens Township, 22 Bridge Replacement 2,000,000 23 (Base Construction Allocation - 24 $1,600,000) 25 (Land Allocation - $100,000) 26 (Design and Contingencies - $300,000) 27 (33) US 220, Bridge over Bridge Street, 28 Towanda Borough, Bridge Rehabilitation 385,000 29 (Base Construction Allocation - 30 $350,000) 19990S0504B0514 - 87 -
1 (Design and Contingencies - $35,000) 2 (34) US 220, Bridge over SR 3020, Towanda 3 Township, Bridge Rehabilitation 495,000 4 (Base Construction Allocation - 5 $450,000) 6 (Design and Contingencies - $45,000) 7 (35) US 220, Bridge over SR 2036, North 8 Towanda Township, Bridge 9 Rehabilitation 715,000 10 (Base Construction Allocation - 11 $650,000) 12 (Design and Contingencies - $65,000) 13 (36) US 220, Bridge over SR 3022, North 14 Towanda Township, Bridge 15 Rehabilitation 770,000 16 (Base Construction Allocation - 17 $700,000) 18 (Design and Contingencies - $70,000) 19 (37) US 220, Bridge over US 6, North 20 Towanda Township, Bridge 21 Reconstruction 1,700,000 22 (Base Construction Allocation - 23 $1,500,000) 24 (Design and Contingencies - $200,000) 25 (38) SR 0409, Camp Creek Box Culvert over 26 Camp Creek, Wyalusing Township, Bridge 27 Replacement 1,150,000 28 (Base Construction Allocation - 29 $750,000) 30 (Land Allocation - $200,000) 19990S0504B0514 - 88 -
1 (Design and Contingencies - $200,000) 2 (39) SR 1022, Ulster River Bridge over 3 Susquehanna River, Ulster Township and 4 Sheshequin Township, Bridge 5 Replacement 16,000,000 6 (Base Construction Allocation - 7 $12,800,000) 8 (Land Allocation - $800,000) 9 (Design and Contingencies - $2,400,000) 10 Section 13. Bucks County. 11 (a) Local Bridges 12 (1) Springfield Township, I-479, Bridge 13 Street Bridge over Cooks Creek, Bridge 14 Replacement 500,000 15 (Base Construction Allocation - 16 $365,000) 17 (Land Allocation - $35,000) 18 (Design and Contingencies - $100,000) 19 (2) Springfield Township, T-404, Hawks 20 Mill County Bridge No.196, Shale Road 21 over Cooks Creek, Bridge 22 Rehabilitation 100,000 23 (Base Construction Allocation - 24 $90,000) 25 (Design and Contingencies - $10,000) 26 (b) State Bridges 27 (1) SR 0032, River Road at Fleecydale over 28 Paunacussing Creek, Solebury Township, 29 Bridge Replacement 1,400,000 30 (Base Construction Allocation - 19990S0504B0514 - 89 -
1 $1,200,000) 2 (Design and Contingencies - $200,000) 3 (2) SR 2002, Otter Street Bridge over 4 Otter Creek, Bristol Borough, Bridge 5 Replacement 1,150,000 6 (Base Construction Allocation - 7 $900,000) 8 (Land Allocation - $50,000) 9 (Design and Contingencies - $200,000) 10 (3) SR 2025, Bristol Road Bridge over 11 Little Neshaminy Creek, Warwick 12 Township, Bridge Replacement 1,120,000 13 (Base Construction Allocation - 14 $900,000) 15 (Land Allocation - $80,000) 16 (Design and Contingencies - $140,000) 17 (4) SR 2047, Hulmeville Avenue Bridge over 18 Conrail, Middletown, Bridge 19 Replacement 5,600,000 20 (Base Construction Allocation - 21 $4,000,000) 22 (Land Allocation - $800,000) 23 (Design and Contingencies - $800,000) 24 (5) SR 4033, Upper Ridge Road Bridge over 25 Unami Creek, Milford Township, Bridge 26 Replacement 2,000,000 27 (Base Construction Allocation - 28 $1,600,000) 29 (Land Allocation - $100,000) 30 (Design and Contingencies - $300,000) 19990S0504B0514 - 90 -
1 (6) SR 4091, Kellers Church Road Bridge 2 over Deep Run, Bedminster, Bridge 3 Replacement 2,000,000 4 (Base Construction Allocation - 5 $1,500,000) 6 (Land Allocation - $150,000) 7 (Design and Contingencies - $350,000) 8 (7) SR 0202, Doylestown Bypass (Five 9 Bridges) over SR 0611, Doylestown 10 Township, Bridge Rehabilitations 2,200,000 11 (Base Construction Allocation - 12 $2,000,000) 13 (Land Allocation - $50,000) 14 (Design and Contingencies - $150,000) 15 (8) SR 0611, Easton Road (Two Bridges) 16 over Tohickon and Deep Run Creeks, 17 Bedminister Township, Bridge 18 Replacements 1,650,000 19 (Base Construction Allocation - 20 $1,500,000) 21 (Land Allocation - $50,000) 22 (Design and Contingencies - $100,000) 23 (9) SR 2089, Almshouse Road Bridge over 24 Neshaminy Creek, Doylestown Township, 25 Bridge Replacement 1,800,000 26 (Base Construction Allocation - 27 $1,500,000) 28 (Land Allocation - $150,000) 29 (Design and Contingencies - $150,000) 30 (10) SR 0013, Bristol Pike over Otter 19990S0504B0514 - 91 -
1 Creek, Bristol Township, Bridge 2 Replacement 1,600,000 3 (Base Construction Allocation - 4 $1,200,000) 5 (Land Allocation - $100,000) 6 (Design and Contingencies - $300,000) 7 (11) SR 0413, Bridge over Mill Creek, 8 Bristol Township, Bridge Replacement 600,000 9 (Base Construction Allocation - 10 $350,000) 11 (Land Allocation - $50,000) 12 (Design and Contingencies - $200,000) 13 (12) SR 2002, State Road over Neshaminy 14 Creek, Bristol Township, Bridge 15 Replacement 3,700,000 16 (Base Construction Allocation - 17 $3,000,000) 18 (Land Allocation - $250,000) 19 (Design and Contingencies - $450,000) 20 (13) SR 0013, Bristol Pike over St. 21 Francis Creek, Bensalem Township, 22 Bridge Replacement 550,000 23 (Base Construction Allocation - 24 $400,000) 25 (Land Allocation - $50,000) 26 (Design and Contingencies - $100,000) 27 (14) SR 0013, SR 0013 over Conrail and 28 Newbold Road, Falls Township, Bridge 29 Replacement 5,000,000 30 (Base Construction Allocation - 19990S0504B0514 - 92 -
1 $4,500,000) 2 (Land Allocation - $150,000) 3 (Design and Contingencies - $350,000) 4 (15) SR 0032, West Bridge Street over 5 Tributary of Delaware River, 6 Morrisville Borough, Bridge 7 Replacement 550,000 8 (Base Construction Allocation - 9 $400,000) 10 (Land Allocation - $50,000) 11 (Design and Contingencies - $100,000) 12 (16) SR 0213, West Maple Avenue over 13 Neshaminy Creek, Middletown Township, 14 Bridge Replacement 2,000,000 15 (Base Construction Allocation - 16 $1,700,000) 17 (Land Allocation - $100,000) 18 (Design and Contingencies - $200,000) 19 (17) SR 1004, Cold Spring Creamery Road 20 over Branch of Pine Run Creek, 21 Buckingham Township, Bridge 22 Replacement 450,000 23 (Base Construction Allocation - 24 $380,000) 25 (Land Allocation - $10,000) 26 (Design and Contingencies - $60,000) 27 (18) SR 2005, Cornwells Avenue over 28 Poquessing Creek, Bensalem Township, 29 Bridge Replacement 350,000 30 (Base Construction Allocation - 19990S0504B0514 - 93 -
1 $250,000) 2 (Land Allocation - $25,000) 3 (Design and Contingencies - $75,000) 4 (19) SR 2026, Trenton Avenue over Rock 5 Run, Falls Township, Bridge 6 Replacement 700,000 7 (Base Construction Allocation - 8 $500,000) 9 (Land Allocation - $50,000) 10 (Design and Contingencies - $150,000) 11 (20) SR 2037, Lincoln Highway Eastbound 12 over Queen Anne Creek, Falls Township, 13 Bridge Replacement 700,000 14 (Base Construction Allocation - 15 $500,000) 16 (Land Allocation - $75,000) 17 (Design and Contingencies - $125,000) 18 (21) SR 2037, Lincoln Highway over Branch 19 of Queen Anne Creek, Falls Township, 20 Bridge Replacement 500,000 21 (Base Construction Allocation - 22 $350,000) 23 (Land Allocation - $50,000) 24 (Design and Contingencies - $100,000) 25 (22) SR 2047, Hulmeville Avenue over 26 Conrail, Middletown Township, Bridge 27 Replacement 1,200,000 28 (Base Construction Allocation - 29 $1,000,000) 30 (Land Allocation - $75,000) 19990S0504B0514 - 94 -
1 (Design and Contingencies - $125,000) 2 (23) SR 2065, Bustleton Pike/Ironworks 3 over Ironworks Creek, Northampton 4 Township, Bridge Rehabilitation 260,000 5 (Base Construction Allocation - 6 $200,000) 7 (Land Allocation - $10,000) 8 (Design and Contingencies - $50,000) 9 Section 14. Butler County. 10 (a) Local Bridges 11 (1) Muddy Creek and Worth Townships, T- 12 348, Muddy Creek Bridge over Muddy 13 Creek, Bridge Replacement 730,000 14 (Base Construction Allocation - 15 $550,000) 16 (Land Allocation - $15,000) 17 (Design and Contingencies - $165,000) 18 (2) Allegheny Township, T-542, Farrington 19 Bridge, Bridge Replacement 700,000 20 (Base Construction Allocation - 21 $500,000) 22 (Land Allocation - $25,000) 23 (Design and Contingencies - $175,000) 24 (3) Concord Township, T-508, Greece City 25 Bridge, Bridge Replacement 700,000 26 (Base Construction Allocation - 27 $500,000) 28 (Land Allocation - $25,000) 29 (Design and Contingencies - $175,000) 30 (4) Cranberry Township, T-326 over Brush 19990S0504B0514 - 95 -
1 Creek, Bridge Replacement 700,000 2 (Base Construction Allocation - 3 $500,000) 4 (Land Allocation - $25,000) 5 (Design and Contingencies - $175,000) 6 (5) Cranberry Township, T-300, Bridge 7 Replacement 700,000 8 (Base Construction Allocation - 9 $500,000) 10 (Land Allocation - $25,000) 11 (Design and Contingencies - $175,000) 12 (6) Jackson Township, T-323, Senn Bridge, 13 Bridge Replacement 700,000 14 (Base Construction Allocation - 15 $500,000) 16 (Land Allocation - $25,000) 17 (Design and Contingencies - $175,000) 18 (7) Jackson Township, T-325, Eidewau 19 Bridge, Bridge Replacement 700,000 20 (Base Construction Allocation - 21 $500,000) 22 (Land Allocation - $25,000) 23 (Design and Contingencies - $175,000) 24 (8) Jefferson Township, T-844 over Thorn 25 Creek, Bridge Replacement 700,000 26 (Base Construction Allocation - 27 $500,000) 28 (Land Allocation - $25,000) 29 (Design and Contingencies - $175,000) 30 (9) Mars Borough, Hook Street, Bridge 19990S0504B0514 - 96 -
1 Replacement 700,000 2 (Base Construction Allocation - 3 $500,000) 4 (Land Allocation - $25,000) 5 (Design and Contingencies - $175,000) 6 (10) Mars Borough, Church Street, Kocher 7 Bridge, Bridge Replacement 700,000 8 (Base Construction Allocation - 9 $500,000) 10 (Land Allocation - $25,000) 11 (Design and Contingencies - $175,000) 12 (11) Middlesex Township, T-380 over Glade 13 Run, Bridge Replacement 700,000 14 (Base Construction Allocation - 15 $500,000) 16 (Land Allocation - $25,000) 17 (Design and Contingencies - $175,000) 18 (12) Worth Township, T-318, Payne Bridge, 19 Bridge Replacement 700,000 20 (Base Construction Allocation - 21 $500,000) 22 (Land Allocation - $25,000) 23 (Design and Contingencies - $175,000) 24 (13) Cranberry Township, T-326 over 25 Tributary of Brush Creek, Bridge 26 Replacement 167,000 27 (Base Construction Allocation - 28 $135,000) 29 (Land Allocation - $19,000) 30 (Design and Contingencies - $13,000) 19990S0504B0514 - 97 -
1 (14) Adams Township, T-391, Brickey and 2 Hill Bridge over Breakneck Creek, 3 Bridge Replacement 600,000 4 (15) Butler City, T-319, Brady Street 5 Bridge, Bridge Replacement 300,000 6 (16) Allegheny Township, T-538, County 7 Bridge No.4, Squaw Valley Bridge No.1, 8 Bridge Replacement 500,000 9 (17) Mercer Township, T-434, County Bridge 10 No.7, Harrisville Bridge, Bridge 11 Replacement 500,000 12 (18) Marion Township, T-434 County Bridge 13 No.9, Wassum Bridge, Bridge 14 Replacement 500,000 15 (19) Venango Township, T-649, County 16 Bridge No.10, Lane Bridge, Bridge 17 Replacement 500,000 18 (20) Parker Township, T-638, County Bridge 19 No.12, Snake Bridge, Bridge 20 Replacement 500,000 21 (21) Parker Township, T-632, County Bridge 22 No.13, Old Iron Bridge, Bridge 23 Replacement 500,000 24 (22) Slippery Rock Township, T-381, County 25 Bridge No.25, Grossman Bridge, Bridge 26 Replacement 600,000 27 (23) Cherry Township, T-428, County Bridge 28 No.26, Duffy Bridge, Bridge 29 Replacement 600,000 30 (24) Cherry Township, T-535, County Bridge 19990S0504B0514 - 98 -
1 No.28, Findley Bridge, Bridge 2 Replacement 500,000 3 (25) Cherry Township, T-416, County Bridge 4 No.29, Christy Bridge No.2, Bridge 5 Replacement 500,000 6 (26) Cherry Township, T-560, County Bridge 7 No.32, Bridge Replacement 700,000 8 (27) Washington Township, T-504, County 9 Bridge No.35, Campbell Bridge, Bridge 10 Replacement 500,000 11 (28) Washington Township, T-452, County 12 Bridge No.36, Hilliard Bridge, Bridge 13 Replacement 500,000 14 (29) Fairview Township, T-636, County 15 Bridge No.39, Murtland Bridge, Bridge 16 Replacement 600,000 17 (30) Fairview Township, T-676, County 18 Bridge No.42, Burk Bridge, Bridge 19 Replacement 600,000 20 (31) Clay Township, T-416, County Bridge 21 No.48, R. C. Miller Bridge, Bridge 22 Replacement 500,000 23 (32) Clay Township, T-414, County Bridge 24 No.49, Muddycreek Bridge, Bridge 25 Replacement 600,000 26 (33) Brady Township, T-368, County Bridge 27 No.52, McCracken Bridge, Bridge 28 Replacement 600,000 29 (34) Brady Township, T-456, County Bridge 30 No.53, Wigton Bridge, Bridge 19990S0504B0514 - 99 -
1 Replacement 500,000 2 (35) Brady Township, T-414, County Bridge 3 No.54, Frank Hall Bridge, Bridge 4 Replacement 500,000 5 (36) Muddycreek Township, T-348, County 6 Bridge No.59, Book Bridge, Bridge 7 Replacement 500,000 8 (37) Worth Township, T-318, County Bridge 9 No.60, Payne Bridge No.2, Bridge 10 Replacement 500,000 11 (38) Muddycreek Township, T-357, County 12 Bridge No.62, Flinner Bridge, Bridge 13 Replacement 500,000 14 (39) Summit Township, T-584, County Bridge 15 No.70, Wadsworth Bridge, Bridge 16 Replacement 600,000 17 (40) Clearfield Township, T-630, County 18 Bridge No.77, McBride Bridge No.2, 19 Bridge Replacement 600,000 20 (41) Clearfield Township, T-630, County 21 Bridge No.78, McBride Bridge No.1, 22 Bridge Replacement 600,000 23 (42) Clearfield Bridge, T-578, County 24 Bridge No.79, Schuler Bridge, Bridge 25 Replacement 600,000 26 (43) Clearfield Township, T-691, County 27 Bridge, No.80, Humes Bridge, Bridge 28 Replacement 500,000 29 (44) Connoquenessing Township, T-431, 30 County Bridge No.82, McGinnis Bridge, 19990S0504B0514 - 100 -
1 Bridge Replacement 700,000 2 (45) Connoquennessing Township, T-427, 3 County Bridge No.84, Hays Bridge, 4 Bridge Replacement 600,000 5 (46) Conoquennessing Township, T-340, 6 County Bridge No.86, Kniess Bridge, 7 Bridge Replacement 600,000 8 (47) Franklin Township, T-439, County 9 Bridge No.87, Martin Bridge, Bridge 10 Replacement 600,000 11 (48) Lancaster Township, T-338, County 12 Bridge No.90, Drushel Bridge, Bridge 13 Replacement 600,000 14 (49) Lancaster Township, T-339, County 15 Bridge No.93, Eichenauer Bridge, Bridge 16 Replacement 500,000 17 (50) Jackson Township, T-323, County 18 Bridge No.97, Senn Bridge, Bridge 19 Replacement 600,000 20 (51) Zelienople Borough, Market Street, 21 County Bridge No.99, Iron City Bridge, 22 Bridge Replacement 600,000 23 (52) Forward Township, T-407, County 24 Bridge No.105, Martin Bridge, Bridge 25 Replacement 600,000 26 (53) Forward Township, T-423, County 27 Bridge No.106, Mardica Bridge, Bridge 28 Replacement 600,000 29 (54) Clinton Township, T-570, County 30 Bridge No.118, Hemphill Bridge, Bridge 19990S0504B0514 - 101 -
1 Replacement 600,000 2 (55) Clinton Township, T-572, County 3 Bridge No.120, Cunningham Bridge, 4 Bridge Replacement 600,000 5 (56) Clinton Township, T-554, County 6 Bridge No.122, Brickyard Hill Bridge, 7 Bridge Replacement 500,000 8 (57) Clinton Township, T-552, County 9 Bridge No.123, Wiley Bridge, Bridge 10 Replacement 500,000 11 (58) Mars Borough, T-396, County Bridge 12 No.133, Mars Bridge, Bridge 13 Replacement 600,000 14 (59) Adams Township, T-401, County Bridge 15 No.137, Rosebaugh Bridge, Bridge 16 Replacement 700,000 17 (60) Adams Township, T-403, County Bridge 18 No.138, Hays Bridge, Bridge 19 Replacement 600,000 20 (61) Middlesex Township, T-485, County 21 Bridge No.141, Steiner Bridge, Bridge 22 Replacement 500,000 23 (62) Middlesex Township, T-380, County 24 Bridge No.142, Glade Run Bridge, Bridge 25 Replacement 600,000 26 (63) Middlesex Township, T-384, County 27 Bridge No.144, Rifley Bridge, Bridge 28 Replacement 600,000 29 (64) Callery Borough, Main Street, County 30 Bridge No.149, Ringeisen Bridge, Bridge 19990S0504B0514 - 102 -
1 Replacement 600,000 2 (b) State Bridges 3 (1) SR 0228, Houseville Bridge over B & LE 4 Railroad, Clinton Township, Bridge Deck 5 Replacement 636,000 6 (Base Construction Allocation - 7 $600,000) 8 (Design and Contingencies - $36,000) 9 (2) SR 0019, Rose Point Bridge over SR 10 0422, Muddycreek Township, Bridge 11 Painting 115,000 12 (Base Construction Allocation - 13 $100,000) 14 (Design and Contingencies - $15,000) 15 (3) SR 0058, Blocks Run Bridge No.1 over 16 Blocks Run, Marion Township, Bridge 17 Painting 65,000 18 (Base Construction Allocation - 19 $50,000) 20 (Design and Contingencies - $15,000) 21 (4) SR 0058, Blocks Run Bridge No.2 over 22 Blocks Run, Venango Township, Bridge 23 Painting 60,000 24 (Base Construction Allocation - 25 $45,000) 26 (Design and Contingencies - $15,000) 27 (5) SR 0058, Murrin Run Bridge over Murrin 28 Run, Venango Township, Bridge Painting 60,000 29 (Base Construction Allocation - 30 $45,000) 19990S0504B0514 - 103 -
1 (Design and Contingencies - $15,000) 2 (6) SR 0068, Glade Run Bridge over Glade 3 Run, Zelienople Borough, Bridge 4 Painting 70,000 5 (Base Construction Allocation - 6 $55,000) 7 (Design and Contingencies - $15,000) 8 (7) SR 0079, Muddy Creek Bridge Northbound 9 over SR 0422 and Muddy Creek, Muddy 10 Creek Township, Bridge Painting 255,000 11 (Base Construction Allocation - 12 $240,000) 13 (Design and Contingencies - $15,000) 14 (8) SR 0079, Muddy Creek Bridge Southbound 15 over SR 0422 and Muddy Creek, Muddy 16 Creek Township, Bridge Painting 255,000 17 (Base Construction Allocation - 18 $240,000) 19 (Design and Contingencies - $15,000) 20 (9) SR 0108, Slippery Rock Exit Bridge 21 over I-79, Worth Township, Bridge 22 Painting 225,000 23 (Base Construction Allocation - 24 $210,000) 25 (Design and Contingencies - $15,000) 26 (10) SR 0138, Glades Wildlife Lake Bridge 27 over South Branch of Slippery Rock 28 Creek, Concord Township, Bridge 29 Painting 85,000 30 (Base Construction Allocation - 19990S0504B0514 - 104 -
1 $70,000) 2 (Design and Contingencies - $15,000) 3 (11) SR 0258, Wolf Creek Bridge over Wolf 4 Creek, Slippery Rock Township, Bridge 5 Painting 125,000 6 (Base Construction Allocation - 7 $110,000) 8 (Design and Contingencies - $15,000) 9 (12) SR 0308, Renick Bridge over Stoney 10 Run and Railroad, Center Township, 11 Bridge Painting 405,000 12 (Base Construction Allocation - 13 $390,000) 14 (Design and Contingencies - $15,000) 15 (13) SR 0422, Mount Chestnut Bridge 16 Eastbound over Little Connoquenessing 17 Creek and SR 3007, Butler Township, 18 Bridge Painting 355,000 19 (Base Construction Allocation - 20 $340,000) 21 (Design and Contingencies - $15,000) 22 (14) SR 0422, Bonnie Brook Bridge over 23 Bonnie Brook, Summit Township, Bridge 24 Painting 90,000 25 (Base Construction Allocation - 26 $75,000) 27 (Design and Contingencies - $15,000) 28 (15) SR 1004, Bruin Bridge over Bear 29 Creek, Bruin Borough, Bridge Painting 85,000 30 (Base Construction Allocation - 19990S0504B0514 - 105 -
1 $70,000) 2 (Design and Contingencies - $15,000) 3 (16) SR 1011, Rattigan Bridge No.1 over 4 Buffalo Creek, Donegal Township, Bridge 5 Painting 55,000 6 (Base Construction Allocation - 7 $40,000) 8 (Design and Contingencies - $15,000) 9 (17) SR 1016, Eastland Drive Bridge over 10 Connoquenessing Creek, Butler Township, 11 Bridge Painting 80,000 12 (Base Construction Allocation - 13 $65,000) 14 (Design and Contingencies - $15,000) 15 (18) SR 1019, Rough Run Bridge over Rough 16 Run, Windfield Township, Bridge 17 Painting 95,000 18 (Base Construction Allocation - 19 $80,000) 20 (Design and Contingencies - $15,000) 21 (19) SR 1019, Chicora Bridge over Buffalo 22 Creek, Chicora Borough, Bridge 23 Painting 70,000 24 (Base Construction Allocation - 25 $55,000) 26 (Design and Contingencies - $15,000) 27 (20) SR 1021, Rattigan Bridge No.2 over 28 Buffalo Creek, Donegal Township, Bridge 29 Painting 70,000 30 (Base Construction Allocation - 19990S0504B0514 - 106 -
1 $55,000) 2 (Design and Contingencies - $15,000) 3 (21) SR 1025, Bonnie Brook Bridge No.1 4 over Bonnie Brook, Summit Township, 5 Bridge Painting 90,000 6 (Base Construction Allocation - 7 $75,000) 8 (Design and Contingencies - $15,000) 9 (22) SR 2004, Connoquenessing Creek Bridge 10 over Connoquenessing Creek, Butler 11 City, Bridge Painting 135,000 12 (Base Construction Allocation - 13 $120,000) 14 (Design and Contingencies - $15,000) 15 (23) SR 2004, Bonnie Brook Bridge No.2 16 over Bonnie Brook, East Butler Borough, 17 Bridge Painting 90,000 18 (Base Construction Allocation - 19 $75,000) 20 (Design and Contingencies - $15,000) 21 (24) SR 2011, Lardintown Run Bridge No.1 22 over Lardintown Run, Clinton Township, 23 Bridge Painting 75,000 24 (Base Construction Allocation - 25 $60,000) 26 (Design and Contingencies - $15,000) 27 (25) SR 2011, Lardintown Run Bridge No.2 28 over Lardintown Run, Clinton Township, 29 Bridge Painting 65,000 30 (Base Construction Allocation - 19990S0504B0514 - 107 -
1 $50,000) 2 (Design and Contingencies - $15,000) 3 (26) SR 2011, Lardintown Run Bridge No.3 4 over Lardintown Run, Clinton Township, 5 Bridge Painting 65,000 6 (Base Construction Allocation - 7 $50,000) 8 (Design and Contingencies - $15,000) 9 (27) SR 3004, McCalmont Bridge over 10 Connoquenessing Creek, Butler Township, 11 Bridge Painting 105,000 12 (Base Construction Allocation - 13 $90,000) 14 (Design and Contingencies - $15,000) 15 (28) SR 3007, Reinfrew Bridge over 16 Connoquenessing Creek, Penn Township, 17 Bridge Painting 115,000 18 (Base Construction Allocation - 19 $100,000) 20 (Design and Contingencies - $15,000) 21 (29) SR 3010, Zeno Bridge over Glade Run, 22 Forward Township, Bridge Painting 105,000 23 (Base Construction Allocation - 24 $90,000) 25 (Design and Contingencies - $15,000) 26 (30) SR 3017, Kaufman Run Bridge over 27 Kaufman Run, Adams Township, Bridge 28 Painting 70,000 29 (Base Construction Allocation - 30 $55,000) 19990S0504B0514 - 108 -
1 (Design and Contingencies - $15,000) 2 (31) SR 3017, Breakneck Creek Bridge over 3 Breakneck Creek, Adams Township, Bridge 4 Painting 105,000 5 (Base Construction Allocation - 6 $90,000) 7 (Design and Contingencies - $15,000) 8 (32) SR 3025, Little Connoquenessing Creek 9 Bridge over Little Connoquenessing 10 Creek, Lancaster Township, Bridge 11 Painting 125,000 12 (Base Construction Allocation - 13 $110,000) 14 (Design and Contingencies - $15,000) 15 (33) SR 4006, Keister's Bridge over 16 Slippery Rock Creek, Slippery Rock 17 Township, Bridge Painting 105,000 18 (Base Construction Allocation - 19 $90,000) 20 (Design and Contingencies - $15,000) 21 (34) SR 4007, Lake Arthur Tributary Bridge 22 over a tributary of Lake Arthur, Worth 23 Township, Bridge Painting 50,000 24 (Base Construction Allocation - 25 $35,000) 26 (Design and Contingencies - $15,000) 27 (35) SR 4007, I-79 North Bridge No.1 over 28 I-79, Worth Township, Bridge Painting 245,000 29 (Base Construction Allocation - 30 $230,000) 19990S0504B0514 - 109 -
1 (Design and Contingencies - $15,000) 2 (36) SR 4007, I-79 North Bridge No.2 over 3 I-79, Worth Township, Bridge Painting 215,000 4 (Base Construction Allocation - 5 $200,000) 6 (Design and Contingencies - $15,000) 7 (37) SR 4010, Bull Valley Bridge over Bull 8 Valley Creek, Washington Township, 9 Bridge Painting 65,000 10 (Base Construction Allocation - 11 $50,000) 12 (Design and Contingencies - $15,000) 13 (38) SR 4012, Seaton Creek Bridge over 14 Seaton Creek, Marion Township, Bridge 15 Painting 65,000 16 (Base Construction Allocation - 17 $50,000) 18 (Design and Contingencies - $15,000) 19 (39) SR 8002, North Shore Exit Bridge over 20 Muddy Creek, Worth Township, Bridge 21 Painting 85,000 22 (Base Construction Allocation - 23 $70,000) 24 (Design and Contingencies - $15,000) 25 (40) SR 0422, Route 422 Overpass, 26 Muddycreek Township, Bridge 27 Replacement 1,450,000 28 (Base Construction Allocation - 29 $1,000,000) 30 (Land Allocation - $100,000) 19990S0504B0514 - 110 -
1 (Design and Contingencies - $350,000) 2 (41) SR 0008, B&LE Railroad Overpass, 3 Mercer Township, Bridge Replacement 1,450,000 4 (Base Construction Allocation - 5 $1,000,000) 6 (Land Allocation - $100,000) 7 (Design and Contingencies - $350,000) 8 (42) SR 0038, B&LE Railroad Overpass, 9 Concord Township, Bridge Replacement 1,050,000 10 (Base Construction Allocation - 11 $750,000) 12 (Land Allocation - $50,000) 13 (Design and Contingencies - $250,000) 14 (43) SR 2002, Conrail Railroad Overpass, 15 Summit Township, Bridge Replacement 1,050,000 16 (Base Construction Allocation - 17 $750,000) 18 (Land Allocation - $50,000) 19 (Design and Contingencies - $250,000) 20 (44) SR 2012, B&LE Railroad Overpass, 21 Jefferson Township, Bridge Replacement 1,050,000 22 (Base Construction Allocation - 23 $750,000) 24 (Land Allocation - $50,000) 25 (Design and Contingencies - $250,000) 26 (45) SR 3004, B&LE Railroad Overpass, 27 Butler Township, Bridge Replacement 595,000 28 (Base Construction Allocation - 29 $400,000) 30 (Land Allocation - $20,000) 19990S0504B0514 - 111 -
1 (Design and Contingencies - $175,000) 2 (46) SR 0008, Bridge over Armco Private 3 Drive, Butler Township, Bridge 4 Replacement 1,450,000 5 (Base Construction Allocation - 6 $1,000,000) 7 (Land Allocation - $100,000) 8 (Design and Contingencies - $350,000) 9 (47) SR 0019, Scholars Run Bridge, Jackson 10 Township, Bridge Replacement 1,050,000 11 (Base Construction Allocation - 12 $750,000) 13 (Land Allocation - $50,000) 14 (Design and Contingencies - $250,000) 15 (48) SR 0019, SR 0019 over SR 0422, 16 Muddycreek Township, Bridge 17 Replacement 1,050,000 18 (Base Construction Allocation - 19 $750,000) 20 (Land Allocation - $50,000) 21 (Design and Contingencies - $250,000) 22 (49) SR 0058, McMurray Run Bridge, Marion 23 Township, Bridge Replacement 1,050,000 24 (Base Construction Allocation - 25 $750,000) 26 (Land Allocation - $50,000) 27 (Design and Contingencies - $250,000) 28 (50) SR 0068, Sullivan Run Bridge, Butler 29 Township, Bridge Replacement 1,450,000 30 (Base Construction Allocation - 19990S0504B0514 - 112 -
1 $1,000,000) 2 (Land Allocation - $100,000) 3 (Design and Contingencies - $350,000) 4 (51) SR 0080, I-80 over TR 540, Allegheny 5 Township, Bridge Replacement 1,450,000 6 (Base Construction Allocation - 7 $1,000,000) 8 (Land Allocation - $100,000) 9 (Design and Contingencies - $350,000) 10 (52) SR 0138, Muddy Creek Bridge, Clay 11 Township, Bridge Replacement 595,000 12 (Base Construction Allocation - 13 $400,000) 14 (Land Allocation - $20,000) 15 (Design and Contingencies - $175,000) 16 (53) SR 0173, Slippery Rock Creek Bridge, 17 Slippery Rock Township, Bridge 18 Replacement 1,050,000 19 (Base Construction Allocation - 20 $750,000) 21 (Land Allocation - $50,000) 22 (Design and Contingencies - $250,000) 23 (54) SR 0079, I-79 North Bridge over Ramp, 24 Jackson Township, Bridge Replacement 1,450,000 25 (Base Construction Allocation - 26 $1,000,000) 27 (Land Allocation - $100,000) 28 (Design and Contingencies - $350,000) 29 (55) SR 0079, I-79 South Bridge over Ramp, 30 Jackson Township, Bridge Replacement 1,450,000 19990S0504B0514 - 113 -
1 (Base Construction Allocation - 2 $1,000,000) 3 (Land Allocation - $100,000) 4 (Design and Contingencies - $350,000) 5 (56) SR 0079, I-79 over SR 0068, Jackson 6 Township, Bridge Replacement 1,450,000 7 (Base Construction Allocation - 8 $1,000,000) 9 (Land Allocation - $100,000) 10 (Design and Contingencies - $350,000) 11 (57) SR 0079, I-79 over TR 347, Lancaster 12 Township, Bridge Replacement 1,450,000 13 (Base Construction Allocation - 14 $1,000,000) 15 (Land Allocation - $100,000) 16 (Design and Contingencies - $350,000) 17 (58) SR 0079, I-79 North Bridge over SR 18 0422, Worth Township, Bridge 19 Replacement 1,450,000 20 (Base Construction Allocation - 21 $1,000,000) 22 (Land Allocation - $100,000) 23 (Design and Contingencies - $350,000) 24 (59) SR 0079, I-79 South Bridge over SR 25 0422, Worth Township, Bridge 26 Replacement 1,450,000 27 (Base Construction Allocation - 28 $1,000,000) 29 (Land Allocation - $100,000) 30 (Design and Contingencies - $350,000) 19990S0504B0514 - 114 -
1 (60) SR 0422, SR 0422 over SR 4005, 2 Muddycreek Township, Bridge 3 Replacement 1,450,000 4 (Base Construction Allocation - 5 $1,000,000) 6 (Land Allocation - $100,000) 7 (Design and Contingencies - $350,000) 8 (61) SR 0528, SR 0528 over SR 0422, 9 Franklin Township, Bridge Replacement 1,050,000 10 (Base Construction Allocation - 11 $750,000) 12 (Land Allocation - $50,000) 13 (Design and Contingencies - $250,000) 14 (62) SR 1010, Bear Creek Bridge, Fairview 15 Township, Bridge Replacement 1,050,000 16 (Base Construction Allocation - 17 $750,000) 18 (Land Allocation - $50,000) 19 (Design and Contingencies - $250,000) 20 (63) SR 1014, Bonnie Brook Bridge over 21 Bonnie Brook, Summit Township, Bridge 22 Replacement 595,000 23 (Base Construction Allocation - 24 $400,000) 25 (Land Allocation - $20,000) 26 (Design and Contingencies - $175,000) 27 (64) SR 1016, Connoquenessing Creek 28 Bridge, Summit Township, Bridge 29 Replacement 595,000 30 (Base Construction Allocation - 19990S0504B0514 - 115 -
1 $400,000) 2 (Land Allocation - $20,000) 3 (Design and Contingencies - $175,000) 4 (65) SR 2006, SR 2006 over SR 0422, Summit 5 Township, Bridge Replacement 1,050,000 6 (Base Construction Allocation - 7 $750,000) 8 (Land Allocation - $50,000) 9 (Design and Contingencies - $250,000) 10 (66) SR 2010, Bridge over Branch of Thorn 11 Creek, Jefferson Township, Bridge 12 Replacement 1,050,000 13 (Base Construction Allocation - 14 $750,000) 15 (Land Allocation - $50,000) 16 (Design and Contingencies - $250,000) 17 (67) SR 2010, Little Buffalo Creek Bridge, 18 Winfield Township, Bridge Replacement 1,050,000 19 (Base Construction Allocation - 20 $750,000) 21 (Land Allocation - $50,000) 22 (Design and Contingencies - $250,000) 23 (68) SR 2011, Bridge over Branch of Bull 24 Creek, Clinton Township, Bridge 25 Replacement 595,000 26 (Base Construction Allocation - 27 $400,000) 28 (Land Allocation - $20,000) 29 (Design and Contingencies - $175,000) 30 (69) SR 2011, Little Bull Run Bridge No.4 19990S0504B0514 - 116 -
1 over Bull Run, Clinton Township, Bridge 2 Replacement 595,000 3 (Base Construction Allocation - 4 $400,000) 5 (Land Allocation - $20,000) 6 (Design and Contingencies - $175,000) 7 (70) SR 2018, Bridge No.1 over Branch of 8 Buffalo Creek, Winfield Township, 9 Bridge Replacement 1,050,000 10 (Base Construction Allocation - 11 $750,000) 12 (Land Allocation - $50,000) 13 (Design and Contingencies - $250,000) 14 (71) SR 2018, Bridge No.2 over Branch of 15 Buffalo Creek, Winfield Township, 16 Bridge Replacement 1,050,000 17 (Base Construction Allocation - 18 $750,000) 19 (Land Allocation - $50,000) 20 (Design and Contingencies - $250,000) 21 (72) SR 3025, Little Connoquenessing Creek 22 Bridge, Lancaster Township, Bridge 23 Replacement 595,000 24 (Base Construction Allocation - 25 $400,000) 26 (Land Allocation - $20,000) 27 (Design and Contingencies - $175,000) 28 (73) SR 4007, SR 4007 over SR 0422, Worth 29 Township, Bridge Replacement 1,050,000 30 (Base Construction Allocation - 19990S0504B0514 - 117 -
1 $750,000) 2 (Land Allocation - $50,000) 3 (Design and Contingencies - $250,000) 4 (74) SR 4007, Park Road Bridge, Worth 5 Township, Bridge Replacement 1,050,000 6 (Base Construction Allocation - 7 $750,000) 8 (Land Allocation - $50,000) 9 (Design and Contingencies - $250,000) 10 (75) SR 4010, Long Run Bridge, Slippery 11 Rock Township, Bridge Replacement 595,000 12 (Base Construction Allocation - 13 $400,000) 14 (Land Allocation - $20,000) 15 (Design and Contingencies - $175,000) 16 (76) SR 8005, SR 8005 over SR 0019, 17 Jackson Township, Bridge Replacement 595,000 18 (Base Construction Allocation - 19 $400,000) 20 (Land Allocation - $20,000) 21 (Design and Contingencies - $175,000) 22 (77) SR 0008, William Flynn Bridge, 23 Middlesex Township, Bridge Replacement 1,450,000 24 (Base Construction Allocation - 25 $1,000,000) 26 (Land Allocation - $100,000) 27 (Design and Contingencies - $350,000) 28 (78) SR 0008, Glade Run Bridge, Middlesex 29 Township, Bridge Rehabilitation 1,450,000 30 (Base Construction Allocation - 19990S0504B0514 - 118 -
1 $1,000,000) 2 (Land Allocation - $100,000) 3 (Design and Contingencies - $350,000) 4 (79) SR 0008, Little Glade Run Bridge 5 No.1, Middlesex Township, Bridge 6 Rehabilitation 1,450,000 7 (Base Construction Allocation - 8 $1,000,000) 9 (Land Allocation - $100,000) 10 (Design and Contingencies - $350,000) 11 (80) SR 0008, Little Glade Run Bridge 12 No.2, Middlesex Township, Bridge 13 Rehabilitation 1,450,000 14 (Base Construction Allocation - 15 $1,000,000) 16 (Land Allocation - $100,000) 17 (Design and Contingencies - $350,000) 18 (81) SR 0008, Glade Run Bridge No.2, 19 Middlesex Township, Bridge 20 Rehabilitation 1,450,000 21 (Base Construction Allocation - 22 $1,000,000) 23 (Land Allocation - $100,000) 24 (Design and Contingencies - $350,000) 25 (82) SR 0008, Bulcher Run Bridge, Butler 26 Township, Bridge Rehabilitation 1,450,000 27 (Base Construction Allocation - 28 $1,000,000) 29 (Land Allocation - $100,000) 30 (Design and Contingencies - $350,000) 19990S0504B0514 - 119 -
1 (83) SR 0008, Bridge No.2 over Branch of 2 Muddy Creek, Clay Township, Bridge 3 Rehabilitation 1,450,000 4 (Base Construction Allocation - 5 $1,000,000) 6 (Land Allocation - $100,000) 7 (Design and Contingencies - $350,000) 8 (84) SR 0008, Muddy Creek Bridge, Clay 9 Township, Bridge Rehabilitation 1,450,000 10 (Base Construction Allocation - 11 $1,000,000) 12 (Land Allocation - $100,000) 13 (Design and Contingencies - $350,000) 14 (85) SR 0008, Glade Run Bridge No.3, Brady 15 Township, Bridge Rehabilitation 1,450,000 16 (Base Construction Allocation - 17 $1,000,000) 18 (Land Allocation - $100,000) 19 (Design and Contingencies - $350,000) 20 (86) SR 0008, McDonalds Run Bridge, Mercer 21 Township, Bridge Replacement 1,450,000 22 (Base Construction Allocation - 23 $1,000,000) 24 (Land Allocation - $100,000) 25 (Design and Contingencies - $350,000) 26 (87) SR 0008, McMurray Run Bridge, Mercer 27 Township, Bridge Rehabilitation 1,450,000 28 (Base Construction Allocation - 29 $1,000,000) 30 (Land Allocation - $100,000) 19990S0504B0514 - 120 -
1 (Design and Contingencies - $350,000) 2 (88) SR 0019, Glade Run Bridge No.2, 3 Jackson Township, Bridge 4 Rehabilitation 1,050,000 5 (Base Construction Allocation - 6 $750,000) 7 (Land Allocation - $50,000) 8 (Design and Contingencies - $250,000) 9 (89) SR 0019, Glade Run Bridge No.2, 10 Jackson Township, Bridge 11 Rehabilitation 1,050,000 12 (Base Construction Allocation - 13 $750,000) 14 (Land Allocation - $50,000) 15 (Design and Contingencies - $250,000) 16 (90) SR 0038, Connoquenessing Creek 17 Bridge, Center Township, Bridge 18 Rehabilitation 1,050,000 19 (Base Construction Allocation - 20 $750,000) 21 (Land Allocation - $50,000) 22 (Design and Contingencies - $250,000) 23 (91) SR 0038, Pine Run Bridge, Oakland 24 Township, Bridge Rehabilitation 1,050,000 25 (Base Construction Allocation - 26 $750,000) 27 (Land Allocation - $50,000) 28 (Design and Contingencies - $250,000) 29 (92) SR 0038, Concord Bridge, Concord 30 Township, Bridge Rehabilitation 1,050,000 19990S0504B0514 - 121 -
1 (Base Construction Allocation - 2 $750,000) 3 (Land Allocation - $50,000) 4 (Design and Contingencies - $250,000) 5 (93) SR 0038, Little Connoquenessing Creek 6 Bridge No.1, Concord Township, Bridge 7 Rehabilitation 1,050,000 8 (Base Construction Allocation - 9 $750,000) 10 (Land Allocation - $50,000) 11 (Design and Contingencies - $250,000) 12 (94) SR 0038, Little Connoquenessing Creek 13 Bridge, Concord Township, Bridge 14 Rehabilitation 1,050,000 15 (Base Construction Allocation - 16 $750,000) 17 (Land Allocation - $50,000) 18 (Design and Contingencies - $250,000) 19 (95) SR 0038, Little Scrubgrass Creek 20 Bridge, Allegheny Township, Bridge 21 Rehabilitation 1,050,000 22 (Base Construction Allocation - 23 $750,000) 24 (Land Allocation - $50,000) 25 (Design and Contingencies - $250,000) 26 (96) SR 0038, Bridge over Tributary of 27 Scrubgrass Creek, Allegheny Township, 28 Bridge Rehabilitation 1,050,000 29 (Base Construction Allocation - 30 $750,000) 19990S0504B0514 - 122 -
1 (Land Allocation - $50,000) 2 (Design and Contingencies - $250,000) 3 (97) SR 0058, Murrin Run Bridge, Venango 4 Township, Bridge Rehabilitation 1,050,000 5 (Base Construction Allocation - 6 $750,000) 7 (Land Allocation - $50,000) 8 (Design and Contingencies - $250,000) 9 (98) SR 0068, B&LE Railroad Bridge, Summit 10 and Butler Townships, Bridge 11 Rehabilitation 1,450,000 12 (Base Construction Allocation - 13 $1,000,000) 14 (Land Allocation - $100,000) 15 (Design and Contingencies - $350,000) 16 (99) SR 0068, Connoquenessing Creek 17 Bridge, Summit Township, Bridge 18 Rehabilitation 1,050,000 19 (Base Construction Allocation - 20 $750,000) 21 (Land Allocation - $50,000) 22 (Design and Contingencies - $250,000) 23 (100) SR 0068, Buffalo Creek Bridge, 24 Chicora Township, Bridge 25 Rehabilitation 1,050,000 26 (Base Construction Allocation - 27 $750,000) 28 (Land Allocation - $50,000) 29 (Design and Contingencies - $250,000) 30 (101) SR 0068, Buffalo Run Bridge, 19990S0504B0514 - 123 -
1 Fairview Township, Bridge 2 Rehabilitation 1,050,000 3 (Base Construction Allocation - 4 $750,000) 5 (Land Allocation - $50,000) 6 (Design and Contingencies - $250,000) 7 (102) SR 0079, Bridge over Tributary of 8 Glade Run, Jackson Township, Bridge 9 Rehabilitation 1,450,000 10 (Base Construction Allocation - 11 $1,000,000) 12 (Land Allocation - $100,000) 13 (Design and Contingencies - $350,000) 14 (103) SR 0079, Bridge No.1 over Branch of 15 Yellow Creek, Lancaster Township, 16 Bridge Rehabilitation 1,450,000 17 (Base Construction Allocation - 18 $1,000,000) 19 (Land Allocation - $100,000) 20 (Design and Contingencies - $350,000) 21 (104) SR 0079, Bridge No.2 over Branch of 22 Yellow Creek, Lancaster Township, 23 Bridge Rehabilitation 1,450,000 24 (Base Construction Allocation - 25 $1,000,000) 26 (Land Allocation - $100,000) 27 (Design and Contingencies - $350,000) 28 (105) SR 0079, Bridge No.3 over Branch of 29 Yellow Creek, Lancaster Township, 30 Bridge Rehabilitation 1,450,000 19990S0504B0514 - 124 -
1 (Base Construction Allocation - 2 $1,000,000) 3 (Land Allocation - $100,000) 4 (Design and Contingencies - $350,000) 5 (106) SR 0079, Little Yellow Creek Bridge, 6 Lancaster Township, Bridge 7 Rehabilitation 1,450,000 8 (Base Construction Allocation - 9 $1,000,000) 10 (Land Allocation - $100,000) 11 (Design and Contingencies - $350,000) 12 (107) SR 0079, Bridge No.4 over Branch of 13 Yellow Creek, Muddycreek Township, 14 Bridge Rehabilitation 1,450,000 15 (Base Construction Allocation - 16 $1,000,000) 17 (Land Allocation - $100,000) 18 (Design and Contingencies - $350,000) 19 (108) SR 0079, Bridge at Milepost 100, 20 Worth Township, Bridge Rehabilitation 1,450,000 21 (Base Construction Allocation - 22 $1,000,000) 23 (Land Allocation - $100,000) 24 (Design and Contingencies - $350,000) 25 (109) SR 0079, Black Run Bridge, Worth 26 Township, Bridge Rehabilitation 1,450,000 27 (Base Construction Allocation - 28 $1,000,000) 29 (Land Allocation - $100,000) 30 (Design and Contingencies - $350,000) 19990S0504B0514 - 125 -
1 (110) SR 0268, Bridge over Branch of Bear 2 Creek, Petrolia Borough, Bridge 3 Rehabilitation 1,050,000 4 (Base Construction Allocation - 5 $750,000) 6 (Land Allocation - $50,000) 7 (Design and Contingencies - $250,000) 8 (111) SR 0268, Lowrey Run Bridge, 9 Allegheny Township, Bridge 10 Rehabilitation 1,050,000 11 (Base Construction Allocation - 12 $750,000) 13 (Land Allocation - $50,000) 14 (Design and Contingencies - $250,000) 15 (112) SR 0308, B&LE Railroad Bridge, 16 Center Township, Bridge Rehabilitation 1,050,000 17 (Base Construction Allocation - 18 $750,000) 19 (Land Allocation - $50,000) 20 (Design and Contingencies - $250,000) 21 (113) SR 0308, Stony Run Bridge, Center 22 Township, Bridge Rehabilitation 1,050,000 23 (Base Construction Allocation - 24 $750,000) 25 (Land Allocation - $50,000) 26 (Design and Contingencies - $250,000) 27 (114) SR 0356, Little Buffalo Creek 28 Bridge, Buffalo Township, Bridge 29 Rehabilitation 1,050,000 30 (Base Construction Allocation - 19990S0504B0514 - 126 -
1 $750,000) 2 (Land Allocation - $50,000) 3 (Design and Contingencies - $250,000) 4 (115) SR 0356, Big Coal Run Bridge, Summit 5 Township, Bridge Rehabilitation 1,050,000 6 (Base Construction Allocation - 7 $750,000) 8 (Land Allocation - $50,000) 9 (Design and Contingencies - $250,000) 10 (116) SR 0422, Lake Arthur Bridge, 11 Franklin Township, Bridge 12 Rehabilitation 1,450,000 13 (Base Construction Allocation - 14 $1,000,000) 15 (Land Allocation - $100,000) 16 (Design and Contingencies - $350,000) 17 (117) SR 0422, Big Run Bridge, Franklin 18 Township, Bridge Rehabilitation 1,450,000 19 (Base Construction Allocation - 20 $1,000,000) 21 (Land Allocation - $100,000) 22 (Design and Contingencies - $350,000) 23 (118) SR 0422, Mulligan Run Bridge, 24 Franklin Township, Bridge 25 Rehabilitation 1,450,000 26 (Base Construction Allocation - 27 $1,000,000) 28 (Land Allocation - $100,000) 29 (Design and Contingencies - $350,000) 30 (119) SR 0422, Big Mulligan Run Bridge, 19990S0504B0514 - 127 -
1 Franklin Township, Bridge 2 Rehabilitation 1,450,000 3 (Base Construction Allocation - 4 $1,000,000) 5 (Land Allocation - $100,000) 6 (Design and Contingencies - $350,000) 7 (120) SR 0422, Big Sullivan Run Bridge, 8 Butler Township, Bridge Rehabilitation 1,450,000 9 (Base Construction Allocation - 10 $1,000,000) 11 (Land Allocation - $100,000) 12 (Design and Contingencies - $350,000) 13 (121) SR 0422, Connoquenessing Creek 14 Bridge, Butler Township, Bridge 15 Rehabilitation 1,450,000 16 (Base Construction Allocation - 17 $1,000,000) 18 (Land Allocation - $100,000) 19 (Design and Contingencies - $350,000) 20 (122) SR 0422, Bridge No.1 over Tributary 21 of Connoquenessing Creek, Summit 22 Township, Bridge Rehabilitation 1,450,000 23 (Base Construction Allocation - 24 $1,000,000) 25 (Land Allocation - $100,000) 26 (Design and Contingencies - $350,000) 27 (123) SR 0422, Bridge No.2 over Tributary 28 of Bonnie Brook, Butler Township, 29 Bridge Rehabilitation 1,450,000 30 (Base Construction Allocation - 19990S0504B0514 - 128 -
1 $1,000,000) 2 (Land Allocation - $100,000) 3 (Design and Contingencies - $350,000) 4 (124) SR 0422, Bonnie Brook Bridge No.1, 5 Summit Township, Bridge Rehabilitation 1,450,000 6 (Base Construction Allocation - 7 $1,000,000) 8 (Land Allocation - $100,000) 9 (Design and Contingencies - $350,000) 10 (125) SR 0422, Bridge No.3 over Tributary 11 of Bonnie Brook, Summit Township, 12 Bridge Rehabilitation 1,450,000 13 (Base Construction Allocation - 14 $1,000,000) 15 (Land Allocation - $100,000) 16 (Design and Contingencies - $350,000) 17 (126) SR 0422, Bonnie Brook Bridge No.2, 18 Summit Township, Bridge Rehabilitation 1,450,000 19 (Base Construction Allocation - 20 $1,000,000) 21 (Land Allocation - $100,000) 22 (Design and Contingencies - $350,000) 23 (127) SR 0422, Bridge No.4 over Tributary 24 of Bonnie Brook, Summit Township, 25 Bridge Rehabilitation 1,450,000 26 (Base Construction Allocation - 27 $1,000,000) 28 (Land Allocation - $100,000) 29 (Design and Contingencies - $350,000) 30 (128) SR 0422, Little Buffalo Creek 19990S0504B0514 - 129 -
1 Bridge, Clearfield Township, Bridge 2 Rehabilitation 1,450,000 3 (Base Construction Allocation - 4 $1,000,000) 5 (Land Allocation - $100,000) 6 (Design and Contingencies - $350,000) 7 (129) SR 0422, Buffalo Creek Bridge, 8 Clearfield Township, Bridge 9 Rehabilitation 1,450,000 10 (Base Construction Allocation - 11 $1,000,000) 12 (Land Allocation - $100,000) 13 (Design and Contingencies - $350,000) 14 (130) SR 0528, Likens Run Bridge, Evans 15 City Borough, Bridge Rehabilitation 1,050,000 16 (Base Construction Allocation - 17 $750,000) 18 (Land Allocation - $50,000) 19 (Design and Contingencies - $250,000) 20 (131) SR 1010, Glade Run Bridge, Brady 21 Township, Bridge Rehabilitation 595,000 22 (Base Construction Allocation - 23 $400,000) 24 (Land Allocation - $20,000) 25 (Design and Contingencies - $175,000) 26 (132) SR 1010, Big Bear Creek Bridge, 27 Fairview Township, Bridge 28 Rehabilitation 595,000 29 (Base Construction Allocation - 30 $400,000) 19990S0504B0514 - 130 -
1 (Land Allocation - $20,000) 2 (Design and Contingencies - $175,000) 3 (133) SR 1011, Buffalo Creek Bridge, 4 Fairview Township, Bridge 5 Rehabilitation 595,000 6 (Base Construction Allocation - 7 $400,000) 8 (Land Allocation - $20,000) 9 (Design and Contingencies - $175,000) 10 (134) SR 1019, Big Buffalo Run Bridge, 11 Donegal Township, Bridge 12 Rehabilitation 1,050,000 13 (Base Construction Allocation - 14 $750,000) 15 (Land Allocation - $50,000) 16 (Design and Contingencies - $250,000) 17 (135) SR 1025, Bonnie Brook Bridge, Summit 18 Township, Bridge Rehabilitation 1,050,000 19 (Base Construction Allocation - 20 $750,000) 21 (Land Allocation - $50,000) 22 (Design and Contingencies - $250,000) 23 (136) SR 2002, Coal Run Bridge, City of 24 Butler and Butler Township, Bridge 25 Rehabilitation 1,050,000 26 (Base Construction Allocation - 27 $750,000) 28 (Land Allocation - $50,000) 29 (Design and Contingencies - $250,000) 30 (137) SR 2004, Bonnie Brook Bridge, Summit 19990S0504B0514 - 131 -
1 Township, Bridge Rehabilitation 1,050,000 2 (Base Construction Allocation - 3 $750,000) 4 (Land Allocation - $50,000) 5 (Design and Contingencies - $250,000) 6 (138) SR 2012, Thorn Creek Bridge No.1, 7 Jefferson Township, Bridge 8 Rehabilitation 1,050,000 9 (Base Construction Allocation - 10 $750,000) 11 (Land Allocation - $50,000) 12 (Design and Contingencies - $250,000) 13 (139) SR 2012, Thorn Creek Bridge No.2, 14 Jefferson Township, Bridge 15 Rehabilitation 1,050,000 16 (Base Construction Allocation - 17 $750,000) 18 (Land Allocation - $50,000) 19 (Design and Contingencies - $250,000) 20 (140) SR 3001, West Butler Creek Bridge, 21 Butler Township, Bridge Rehabilitation 1,450,000 22 (Base Construction Allocation - 23 $1,000,000) 24 (Land Allocation - $100,000) 25 (Design and Contingencies - $350,000) 26 (141) SR 3007, Thorn Creek Bridge, Butler 27 Township, Bridge Rehabilitation 1,050,000 28 (Base Construction Allocation - 29 $750,000) 30 (Land Allocation - $50,000) 19990S0504B0514 - 132 -
1 (Design and Contingencies - $250,000) 2 (142) SR 3009, Cranberry Run Bridge, Penn 3 Township, Bridge Rehabilitation 595,000 4 (Base Construction Allocation - 5 $400,000) 6 (Land Allocation - $20,000) 7 (Design and Contingencies - $175,000) 8 (143) SR 3010, Saw Mill Run Bridge, Penn 9 Township, Bridge Rehabilitation 595,000 10 (Base Construction Allocation - 11 $400,000) 12 (Land Allocation - $20,000) 13 (Design and Contingencies - $175,000) 14 (144) SR 3015, Bridge No.2 over Tributary 15 of Wolf Run, Forward Township, Bridge 16 Rehabilitation 1,050,000 17 (Base Construction Allocation - 18 $750,000) 19 (Land Allocation - $50,000) 20 (Design and Contingencies - $250,000) 21 (145) SR 3015, Bridge No.3 over Tributary 22 of Wolf Run, Forward Township, Bridge 23 Rehabilitation 1,050,000 24 (Base Construction Allocation - 25 $750,000) 26 (Land Allocation - $50,000) 27 (Design and Contingencies - $250,000) 28 (146) SR 3025, Bridge over Branch of 29 Yellow Creek, Lancaster Township, 30 Bridge Rehabilitation 595,000 19990S0504B0514 - 133 -
1 (Base Construction Allocation - 2 $400,000) 3 (Land Allocation - $20,000) 4 (Design and Contingencies - $175,000) 5 (147) SR 3031, SR 3031 over US 422, Butler 6 Township, Bridge Rehabilitation 595,000 7 (Base Construction Allocation - 8 $400,000) 9 (Land Allocation - $20,000) 10 (Design and Contingencies - $175,000) 11 (148) SR 3034, Bridge over Branch of 12 Semiconon, Prospect Borough, Bridge 13 Rehabilitation 595,000 14 (Base Construction Allocation - 15 $400,000) 16 (Land Allocation - $20,000) 17 (Design and Contingencies - $175,000) 18 (149) SR 4001, SR 4001 over US 422, Butler 19 Township, Bridge Rehabilitation 1,050,000 20 (Base Construction Allocation - 21 $750,000) 22 (Land Allocation - $50,000) 23 (Design and Contingencies - $250,000) 24 (150) SR 4002, Bridge over Branch of Muddy 25 Creek, Clay Township, Bridge 26 Rehabilitation 1,050,000 27 (Base Construction Allocation - 28 $750,000) 29 (Land Allocation - $50,000) 30 (Design and Contingencies - $250,000) 19990S0504B0514 - 134 -
1 (151) T-716, Old Plank Road Bridge, Penn 2 Township, Bridge Replacement 390,000 3 (Base Construction Allocation - 4 $300,000) 5 (Land Allocation - $10,000) 6 (Design and Contingencies - $80,000) 7 (152) SR 3007, Crooked Run Bridge, Center 8 Township, Bridge Replacement 1,050,000 9 (Base Construction Allocation - 10 $750,000) 11 (Land Allocation - $50,000) 12 (Design and Contingencies - $250,000) 13 (153) SR 3010, Glade Run Bridge, Forward 14 Township, Bridge Replacement 595,000 15 (Base Construction Allocation - 16 $400,000) 17 (Land Allocation - $20,000) 18 (Design and Contingencies - $175,000) 19 (154) SR 3013, Big Connoquenessing Bridge, 20 Forward Township, Bridge Replacement 595,000 21 (Base Construction Allocation - 22 $400,000) 23 (Land Allocation - $20,000) 24 (Design and Contingencies - $175,000) 25 (155) SR 0019, SR 0019 over Brush Creek, 26 Cranberry Township, Bridge Replacement 1,050,000 27 (Base Construction Allocation - 28 $800,000) 29 (Land Allocation - $75,000) 30 (Design and Contingencies - $175,000) 19990S0504B0514 - 135 -
1 (156) SR 0079, SR 0079 over Big Brush 2 Creek, Cranberry Township, Bridge 3 Replacement 1,450,000 4 (Base Construction Allocation - 5 $1,100,000) 6 (Land Allocation - $75,000) 7 (Design and Contingencies - $275,000) 8 (157) SR 0079, SR 0079 over Coal Run, 9 Cranberry Township, Bridge Replacement 1,450,000 10 (Base Construction Allocation - 11 $1,100,000) 12 (Land Allocation - $75,000) 13 (Design and Contingencies - $275,000) 14 (158) SR 0228, SR 0228 over CSX Railroad, 15 Adams Township, Bridge Replacement 1,450,000 16 (Base Construction Allocation - 17 $1,100,000) 18 (Land Allocation - $75,000) 19 (Design and Contingencies - $275,000) 20 (159) SR 3015, Breakneck Bridge, Adams 21 Township, Bridge Replacement 595,000 22 (Base Construction Allocation - 23 $400,000) 24 (Land Allocation - $20,000) 25 (Design and Contingencies - $175,000) 26 (160) SR 3022, SR 3022 over Brush Creek, 27 Cranberry Township, Bridge Replacement 1,050,000 28 (Base Construction Allocation - 29 $800,000) 30 (Land Allocation - $75,000) 19990S0504B0514 - 136 -
1 (Design and Contingencies - $175,000) 2 (161) SR 3024, SR 3024 over Big Brush 3 Creek, Cranberry Township, Bridge 4 Replacement 595,000 5 (Base Construction Allocation - 6 $400,000) 7 (Land Allocation - $20,000) 8 (Design and Contingencies - $175,000) 9 (162) SR 0008, Bridge over US 422, Butler 10 Township, Bridge Rehabilitation 1,450,000 11 (Base Construction Allocation - 12 $1,000,000) 13 (Land Allocation - $100,000) 14 (Design and Contingencies - $350,000) 15 (163) SR 0028, Bridge over SR 2017, 16 Buffalo Township, Bridge 17 Rehabilitation 1,450,000 18 (Base Construction Allocation - 19 $1,000,000) 20 (Land Allocation - $100,000) 21 (Design and Contingencies - $350,000) 22 (164) SR 0068, Chicora South Bridge No.2 23 over Buffalo Creek, Chicora Borough, 24 Bridge Replacement 610,000 25 (Base Construction Allocation - 26 $500,000) 27 (Land Allocation - $10,000) 28 (Design and Contingencies - $100,000) 29 (165) SR 0068, Chicora South Bridge No.1 30 over Tributary of Buffalo Creek, 19990S0504B0514 - 137 -
1 Chicora Borough, Bridge Replacement 610,000 2 (Base Construction Allocation - 3 $500,000) 4 (Land Allocation - $10,000) 5 (Design and Contingencies - $100,000) 6 (166) SR 0228, Breakneck Creek Bridge over 7 Breakneck Creek, Adams Township, Bridge 8 Replacement 610,000 9 (Base Construction Allocation - 10 $500,000) 11 (Land Allocation - $10,000) 12 (Design and Contingencies - $100,000) 13 (167) SR 1011, Bonnie Run Bridge over 14 Branch Bonnie Run, East Butler Borough, 15 Bridge Rehabilitation 590,000 16 (Base Construction Allocation - 17 $500,000) 18 (Land Allocation - $20,000) 19 (Design and Contingencies - $70,000) 20 (168) SR 1019, Rough Run Bridge over Rough 21 Run, Windfield Township, Bridge 22 Replacement 440,000 23 (Base Construction Allocation - 24 $350,000) 25 (Land Allocation - $20,000) 26 (Design and Contingencies - $70,000) 27 (169) SR 2006, Butler Interchange Bridge 28 Eastbound over US 422, Summit Township, 29 Bridge Replacement 2,500,000 30 (Base Construction Allocation - 19990S0504B0514 - 138 -
1 $2,000,000) 2 (Land Allocation - $100,000) 3 (Design and Contingencies - $400,000) 4 (170) SR 4007, Muddy Creek Bridge over 5 Muddy Creek, Worth Township, Bridge 6 Replacement 820,000 7 (Base Construction Allocation - 8 $700,000) 9 (Land Allocation - $20,000) 10 (Design and Contingencies - $100,000) 11 (171) SR 4007, Bridge over I-79, Worth 12 Township, Bridge Rehabilitation 1,050,000 13 (Base Construction Allocation - 14 $750,000) 15 (Land Allocation - $50,000) 16 (Design and Contingencies - $250,000) 17 (172) SR 4007, Bridge over I-79, Worth 18 Township, Bridge Rehabilitation 1,050,000 19 (Base Construction Allocation - 20 $750,000) 21 (Land Allocation - $50,000) 22 (Design and Contingencies - $250,000) 23 Section 15. Cambria County 24 (a) Local Bridges 25 (1) Summerhill Township, T-346, Bridge 26 No.1, Howard Avenue over Beaverdam Run, 27 Bridge Replacement 450,000 28 (Base Construction Allocation - 29 $350,000) 30 (Design and Contingencies - $100,000) 19990S0504B0514 - 139 -
1 (2) West Carroll Township, T-505 over 2 Blacklick Creek, Bridge Replacement 235,000 3 (Base Construction Allocation - 4 $200,000) 5 (Land Allocation - $10,000) 6 (Design and Contingencies - $25,000) 7 (3) West Carroll Township, T-626 over Fox 8 Run, Bridge Replacement 235,000 9 (Base Construction Allocation - 10 $200,000) 11 (Land Allocation - $10,000) 12 (Design and Contingencies - $25,000) 13 (b) State Bridges 14 (1) SR 1030, Carl Road over Slate Lick 15 Creek, Clearfield Township, Bridge 16 Replacement 240,000 17 (Base Construction Allocation - 18 $200,000) 19 (Land Allocation - $10,000) 20 (Design and Contingencies - $30,000) 21 (2) SR 0271, Maple Avenue Bridge over 22 Little Conemaugh River and Conrail, 23 Phase II, City of Johnstown, Bridge 24 Painting 500,000 25 (Base Construction Allocation - 26 $500,000) 27 (3) SR 3033, PA 56 Detour Bridge over 28 Solomon Run, Richland Township, Bridge 29 Replacement 350,000 30 (Base Construction Allocation - 19990S0504B0514 - 140 -
1 $250,000) 2 (Land Allocation - $15,000) 3 (Design and Contingencies - $85,000) 4 (4) SR 0403, Stonycreek Bridge over 5 Stonycreek River, City of Johnstown, 6 Bridge Replacement 3,600,000 7 (Base Construction Allocation - 8 $2,915,000) 9 (Land Allocation - $195,000) 10 (Design and Contingencies - $490,000) 11 Section 16. Cameron County. 12 (a) Local Bridges 13 (1) Shippen Township, T-345, Hercules 14 Hollow Bridge over West Creek, Bridge 15 Replacement 760,000 16 (Base Construction Allocation - 17 $600,000) 18 (Land Allocation - $10,000) 19 (Design and Contingencies - $150,000) 20 (2) Grove Township, T-355, Bridge over 21 Upper Jerry Run, Bridge Replacement 224,000 22 (Base Construction Allocation - 23 $160,000) 24 (Land Allocation - $8,000) 25 (Design and Contingencies - $56,000) 26 (b) State Bridges 27 (1) SR 0120, Bridge over Still House Run, 28 Lumber Township, Bridge Replacement 400,000 29 (Base Construction Allocation - 30 $250,000) 19990S0504B0514 - 141 -
1 (Land Allocation - $50,000) 2 (Design and Contingencies - $100,000) 3 (2) SR 4004, Bridge over Driftwood Branch, 4 Shippen Township, Bridge Painting 115,000 5 (Base Construction Allocation - 6 $110,000) 7 (Design and Contingencies - $5,000) 8 (3) SR 4004, Elk Fork Bridge over 9 Driftwood Branch, Shippen Township, 10 Bridge Replacement 130,000 11 (Base Construction Allocation - 12 $100,000) 13 (Land Allocation - $10,000) 14 (Design and Contingencies - $20,000) 15 Section 17. Carbon County. 16 (a) Local Bridges 17 (1) Penn Forest Township, T-481, County 18 Bridge No.21 over Panther Creek, Bridge 19 Replacement 290,000 20 (Base Construction Allocation - 21 $180,000) 22 (Land Allocation - $10,000) 23 (Design and Contingencies - $100,000) 24 (2) Mahoning Township, T-390, Bridge over 25 Mahoning Creek, Bridge Replacement 92,000 26 (Base Construction Allocation - 27 $80,000) 28 (Land Allocation - $4,000) 29 (Design and Contingencies - $8,000) 30 (3) Lausanne Township, T-502, Bridge over 19990S0504B0514 - 142 -
1 Schaffers Run, Bridge Replacement 320,000 2 (Base Construction Allocation - 3 $212,000) 4 (Land Allocation - $8,000) 5 (Design and Contingencies - $100,00) 6 (4) Towamensing Township, T-435, Bridge 7 over Wild Creek, Bridge Replacement 357,000 8 (Base Construction Allocation - 9 $220,000) 10 (Land Allocation - $9,000) 11 (Design and Contingencies - $128,000) 12 (5) Bowmanstown Borough, Ore Street Bridge 13 over Fireline Creek, Bridge 14 Replacement 360,000 15 (Base Construction Allocation - 16 $250,000) 17 (Land Allocation - $10,000) 18 (Design and Contingencies - $100,000) 19 (6) Packer Township, T-463, Bridge over 20 Wetzel Creek, Bridge Replacement 360,000 21 (Base Construction Allocation - 22 $250,000) 23 (Land Allocation - $10,000) 24 (Design and Contingencies - $100,000) 25 (7) East Penn Township, T-354, County 26 Bridge No.6 over Lizard Creek, Bridge 27 Replacement 974,000 28 (Base Construction Allocation - 29 $600,000) 30 (Land Allocation - $300,000) 19990S0504B0514 - 143 -
1 (Design and Contingencies - $74,000) 2 (b) State Bridges 3 (1) SR 2002, Delaware Avenue over Palmer 4 Creek, Palmerton Borough, Bridge 5 Replacement 568,000 6 (Base Construction Allocation - 7 $318,000) 8 (Land Allocation - $150,000) 9 (Design and Contingencies - $100,000) 10 (2) SR 4010, SR 4010 over Quakake Creek, 11 Packer Township, Bridge Replacement 412,000 12 (Base Construction Allocation - 13 $202,000) 14 (Land Allocation - $150,000) 15 (Design and Contingencies - $60,000) 16 (3) SR 0209, SR 0209 Turnpike Ramp, 17 Mahoning Interchange, Franklin 18 Township, Bridge Replacement 1,260,000 19 (Base Construction Allocation - 20 $750,000) 21 (Land Allocation - $300,000) 22 (Design and Contingencies - $210,000) 23 (4) SR 0248, SR 0248 over Pohopoco Creek, 24 Parryville Borough Line, Lower 25 Towamensing Township, Bridge 26 Rehabilitation 415,000 27 (Base Construction Allocation - 28 $315,000) 29 (Design and Contingencies - $100,000) 30 (5) SR 4010, SR 4010 over Hartz Creek, 19990S0504B0514 - 144 -
1 Packer Township, Bridge Replacement 615,000 2 (Base Construction Allocation - 3 $370,000) 4 (Land Allocation - $150,000) 5 (Design and Contingencies - $95,000) 6 (6) SR 0534, SR 0534 over Sand Spring Run, 7 2 Miles South of Lehigh Tannery, Kidder 8 Township, Bridge Replacement 340,000 9 (Base Construction Allocation - 10 $160,000) 11 (Land Allocation - $125,000) 12 (Design and Contingencies - $55,000) 13 (7) SR 0209, SR 0209 over Pohopoco Creek, 14 Village of Harrity, Franklin Township, 15 Bridge Rehabilitation 885,000 16 (Base Construction Allocation - 17 $680,000) 18 (Design and Contingencies - $205,000) 19 (8) SR 0534, Pa 534 over I-80, Kidder 20 Township, Bridge Rehabilitation 540,000 21 (Base Construction Allocation - 22 $440,000) 23 (Design and Contingencies - $100,000) 24 (9) SR 0248, Bridge over Aquashicola 25 Creek, Lower Towamensing Township, 26 Bridge Rehabilitation 310,000 27 (Base Construction Allocation - 28 $300,000) 29 (Design and Contingencies - $10,000) 30 (10) SR 0534, Bridge over Hickory Run, 19990S0504B0514 - 145 -
1 Kidder Township, Bridge Rehabilitation 830,000 2 (Base Construction Allocation - 3 $700,000) 4 (Land Allocation - $30,000) 5 (Design and Contingencies - $100,000) 6 (11) SR 0903, Bridge over Lehigh River, 7 Jim Thorpe Borough, Bridge 8 Rehabilitation 1,250,000 9 (Base Construction Allocation - 10 $1,000,000) 11 (Land Allocation - $50,000) 12 (Design and Contingencies - $200,000) 13 (12) SR 0940, Bridge over Black Creek, 14 Kidder Township, Bridge Replacement 185,000 15 (Base Construction Allocation - 16 $150,000) 17 (Design and Contingencies - $35,000) 18 (13) SR 2006, Bridge over Buckwha Creek, 19 Lower Towamensing Township, Bridge 20 Replacement 1,240,000 21 (Base Construction Allocation - 22 $700,000) 23 (Land Allocation - $90,000) 24 (Design and Contingencies - $450,000) 25 (14) SR 2008, Bridge over Pohopoco Creek, 26 Parryville Borough, Bridge Replacement 920,000 27 (Base Construction Allocation - 28 $600,000) 29 (Land Allocation - $90,000) 30 (Design and Contingencies - $230,000) 19990S0504B0514 - 146 -
1 (15) SR 3005, Bridge over Mahoning Creek, 2 Mahoning Township, Bridge Replacement 308,000 3 (Base Construction Allocation - 4 $280,000) 5 (Design and Contingencies - $28,000) 6 (16) SR 4014, Bridge over Tributary of 7 Indian Run, Lehigh Township, Bridge 8 Replacement 153,000 9 (Base Construction Allocation - 10 $130,000) 11 (Land Allocation - $10,000) 12 (Design and Contingencies - $13,000) 13 (17) SR 4014, Bridge over Tributary of 14 Indian Run, Lehigh Township, Bridge 15 Replacement 88,000 16 (Base Construction Allocation - 17 $80,000) 18 (Design and Contingencies - $8,000) 19 (18) SR 2002, Bridge over Chestnut Ridge 20 Railroad, Palmerton Borough, Bridge 21 Deck Rehabilitation 500,000 22 (Base Construction Allocation - 23 $500,000) 24 Section 18. Centre County. 25 (a) Local Bridges 26 (1) Greene Township, T-350, Stover Road 27 Bridge, Bridge Replacement 230,000 28 (Base Construction Allocation - 29 $180,000) 30 (Land Allocation - $10,000) 19990S0504B0514 - 147 -
1 (Design and Contingencies - $40,000) 2 (2) Howard Township, T-398 over Bullit 3 Run, Bridge Rehabilitation 11,000 4 (Base Construction Allocation - $9,000) 5 (Design and Contingencies - $2,000) 6 (3) Halfmoon Township, T-307 over 7 Loveville Creek, Bridge Replacement 21,000 8 (Base Construction Allocation - 9 $19,000) 10 (Design and Contingencies - $2,000) 11 (4) Penn Township, T-839 over Pine Creek, 12 Bridge Rehabilitation 80,000 13 (Base Construction Allocation - 14 $60,000) 15 (Design and Contingencies - $20,000) 16 (5) Port Matilda Borough, Pedestrian 17 Bridge over Bald Eagle Creek, Bridge 18 Rehabilitation 200,000 19 (Base Construction Allocation - 20 $175,000) 21 (Design and Contingencies - $25,000) 22 (6) Spring Township, T-367, Hill Road 23 Bridge, Bridge Replacement 200,000 24 (Base Construction Allocation - 25 $150,000) 26 (Land Allocation - $10,000) 27 (Design and Contingencies - $40,000) 28 (7) Taylor Township, T-308, McMonagle Road 29 over Sparrow Run, Bridge Replacement 330,000 30 (Base Construction Allocation - 19990S0504B0514 - 148 -
1 $275,000) 2 (Land Allocation - $5,000) 3 (Design and Contingencies - $50,000) 4 (8) Rush Township, Six Mile Road Bridge 5 over Six Mile Run, Bridge Replacement 155,000 6 (Base Construction Allocation - 7 $137,000) 8 (Land Allocation - $5,000) 9 (Design and Contingencies - $13,000) 10 (9) Taylor Township, T-300, Big Fill Run 11 Bridge over Big Fill Run, Bridge 12 Replacement 310,000 13 (Base Construction Allocation - 14 $200,000) 15 (Land Allocation - $10,000) 16 (Design and Contingencies - $100,000) 17 (10) Taylor Township, T-305, Bald Eagle 18 Creek Bridge over Bald Eagle Creek, 19 Bridge Replacement 360,000 20 (Base Construction Allocation - 21 $250,000) 22 (Land Allocation - $10,000) 23 (Design and Contingencies - $100,000) 24 (b) State Bridges 25 (1) SR 0080, I-80 Viaduct over Moshannon 26 Creek and Conrail, Rush Township, 27 Bridge Rehabilitation 14,510,000 28 (Base Construction Allocation - 29 $13,210,000) 30 (Design and Contingencies - $1,300,000) 19990S0504B0514 - 149 -
1 (2) SR 1002, Marsh Creek Bridge over Marsh 2 Creek, Boggs Township, Bridge 3 Replacement 760,000 4 (Base Construction Allocation - 5 $630,000) 6 (Land Allocation - $20,000) 7 (Design and Contingencies - $110,000) 8 (3) SR 1002, Little Marsh Creek Bridge 9 over Little Marsh Creek, Curtin 10 Township, Bridge Replacement 700,000 11 (Base Construction Allocation - 12 $600,000) 13 (Land Allocation - $20,000) 14 (Design and Contingencies - $80,000) 15 (4) SR 2012, Penns Creek Bridge Northwest 16 of the Village of Spring Mills, Gregg 17 Township, Bridge Replacement 470,000 18 (Base Construction Allocation - 19 $360,000) 20 (Land Allocation - $20,000) 21 (Design and Contingencies - $90,000) 22 (5) SR 0220, SR 0220 over Laurel Run, Port 23 Matilda Borough, Bridge Rehabilitation 450,000 24 (Base Construction Allocation - 25 $400,000) 26 (Design and Contingencies - $50,000) 27 (6) SR 0053, Moshannon Creek Bridge over 28 Moshannon Creek, Philipsburg Borough, 29 Bridge Replacement 2,250,000 30 (Base Construction Allocation - 19990S0504B0514 - 150 -
1 $2,000,000) 2 (Land Allocation - $50,000) 3 (Design and Contingencies - $200,000) 4 (7) SR 0144, Bald Eagle Creek Bridge over 5 Bald Eagle Creek, Boggs Township, 6 Bridge Replacement 1,210,000 7 (Base Construction Allocation - 8 $950,000) 9 (Land Allocation - $10,000) 10 (Design and Contingencies - $250,000) 11 (8) SR 0879, Susquehanna Bridge over West 12 Branch of Susquehanna River, Burnside 13 Township, Bridge Replacement 3,700,000 14 (Base Construction Allocation - 15 $3,200,000) 16 (Land Allocation - $100,000) 17 (Design and Contingencies - $400,000) 18 (9) SR 0970, Bridge over Moshannon Creek, 19 Rush Township, Bridge Painting 310,000 20 (Base Construction Allocation - 21 $300,000) 22 (Design and Contingencies - $10,000) 23 (10) SR 1005, Nittany Creek Bridge over 24 Nittany Creek, Marion Township, Bridge 25 Replacement 260,000 26 (Base Construction Allocation - 27 $150,000) 28 (Land Allocation - $10,000) 29 (Design and Contingencies - $100,000) 30 (11) SR 2007, Spruce Creek Bridge over 19990S0504B0514 - 151 -
1 Spruce Creek, Gregg Township, Bridge 2 Replacement 260,000 3 (Base Construction Allocation - 4 $150,000) 5 (Land Allocation - $10,000) 6 (Design and Contingencies - $100,000) 7 (12) SR 2011, Penns Creek Bridge over 8 Penns Creek, Penn Township, Bridge 9 Replacement 1,040,000 10 (Base Construction Allocation - 11 $830,000) 12 (Land Allocation - $10,000) 13 (Design and Contingencies - $200,000) 14 (13) SR 2012, Spring Bridge over Penns 15 Creek, Gregg Township, Bridge 16 Replacement 670,000 17 (Base Construction Allocation - 18 $500,000) 19 (Land Allocation - $20,000) 20 (Design and Contingencies - $150,000) 21 (14) SR 2018, Mill Race Bridge over Mill 22 Race, Penn Township, Bridge Painting 8,000 23 (Base Construction Allocation - $7,000) 24 (Design and Contingencies - $1,000) 25 (15) SR 3027, Trout Run Bridge over Trout 26 Run, Rush Township, Bridge Replacement 270,000 27 (Base Construction Allocation - 28 $160,000) 29 (Land Allocation - $10,000) 30 (Design and Contingencies - $100,000) 19990S0504B0514 - 152 -
1 (16) SR 3034, Cold Stream Run Bridge over 2 Cold Stream Run, Rush Township, Bridge 3 Replacement 746,000 4 (Base Construction Allocation - 5 $576,000) 6 (Land Allocation - $20,000) 7 (Design and Contingencies - $150,000) 8 (17) SR 4004, Wallace Run Bridge over 9 Wallace Run, Boggs Township, Bridge 10 Replacement 455,000 11 (Base Construction Allocation - 12 $345,000) 13 (Land Allocation - $10,000) 14 (Design and Contingencies - $100,000) 15 (18) SR 4005, Bridge over I-80, Snow Shoe 16 Township, Bridge Replacement 2,400,000 17 (Base Construction Allocation - 18 $2,000,000) 19 (Land Allocation - $100,000) 20 (Design and Contingencies - $300,000) 21 (19) SR 4006, Moshannon Creek Bridge over 22 Moshannon Creek, Rush Township, Bridge 23 Replacement 1,000,000 24 (Base Construction Allocation - 25 $780,000) 26 (Land Allocation - $20,000) 27 (Design and Contingencies - $200,000) 28 Section 19. Chester County. 29 (a) Local Bridges 30 (1) Parkesburg Borough, State Street 19990S0504B0514 - 153 -
1 Pedestrian Bridge over Amtrak, Bridge 2 Replacement 1,700,000 3 (Base Construction Allocation - 4 $1,000,000) 5 (Land Allocation - $500,000) 6 (Design and Contingencies - $200,000) 7 (2) East Fallowfield Township, T-362, 8 Timacuia Road under Penn Central 9 Railroad, Bridge Removal 445,000 10 (Base Construction Allocation - 11 $400,000) 12 (Land Allocation - $30,000) 13 (Design and Contingencies - $15,000) 14 (3) East Marlborough Township, T-402, 15 County Bridge No.65, Mill Road Bridge 16 over West Branch of Red Clay Creek, 17 Bridge Replacement 345,000 18 (Base Construction Allocation - 19 $291,000) 20 (Land Allocation - $25,000) 21 (Design and Contingencies - $29,000) 22 (4) Oxford Borough, Broad Street Bridge 23 over SEPTA, Bridge Replacement 1,304,000 24 (Base Construction Allocation - 25 $1,125,000) 26 (Land Allocation - $20,000) 27 (Design and Contingencies - $159,000) 28 (5) Penn Township, County Bridge No.260, 29 Posey Mill Road Bridge over Big Elk 30 Creek, Bridge Replacement 425,000 19990S0504B0514 - 154 -
1 (Base Construction Allocation - 2 $300,000) 3 (Land Allocation - $25,000) 4 (Design and Contingencies - $100,000) 5 (6) Tredyffrin Township, Old Lancaster 6 Pike Bridge over Amtrak, Bridge 7 Rehabilitation 465,000 8 (Base Construction Allocation - 9 $400,000) 10 (Land Allocation - $30,000) 11 (Design and Contingencies - $35,000) 12 (7) Tredyffrin Township, T-807, Evans Road 13 Bridge over Conrail, Bridge 14 Replacement 195,000 15 (Base Construction Allocation - 16 $150,000) 17 (Land Allocation - $30,000) 18 (Design and Contingencies - $15,000) 19 (8) West Caln and West Brandywine 20 Townships, County Bridge No.283, Reid 21 Road Bridge over West Branch of 22 Brandywine Creek, Bridge Replacement 740,000 23 (Base Construction Allocation - 24 $600,000) 25 (Land Allocation - $40,000) 26 (Design and Contingencies - $100,000) 27 (9) West Goshen Township, T-210, Old 28 Eachus Mill Road Bridge over SEPTA, 29 Bridge Replacement 615,000 30 (Base Construction Allocation - 19990S0504B0514 - 155 -
1 $500,000) 2 (Land Allocation - $15,000) 3 (Design and Contingencies - $100,000) 4 (10) West Goshen Township, T-328, Bridge 5 over Penn Central Railroad, Bridge 6 Removal 132,000 7 (Base Construction Allocation - 8 $110,000) 9 (Land Allocation - $5,000) 10 (Design and Contingencies - $17,000) 11 (11) West Marlborough Township, T-368, 12 Creek Road Bridge under Penn Central 13 Railroad, Bridge Removal 580,000 14 (Base Construction Allocation - 15 $500,000) 16 (Land Allocation - $5,000) 17 (Design and Contingencies - $75,000) 18 (12) West Marlborough Township, Bridge 19 over Doe Run, Bridge Replacement 915,000 20 (Base Construction Allocation - 21 $750,000) 22 (Land Allocation - $25,000) 23 (Design and Contingencies - $140,000) 24 (13) East Coventry Township, Zeiber Road 25 over Pigeon Creek, Bridge Replacement 375,000 26 (Base Construction Allocation - 27 $300,000) 28 (Land Allocation - $15,000) 29 (Design and Contingencies - $60,000) 30 (14) South Coventry Township, Young Road 19990S0504B0514 - 156 -
1 over Pigeon Creek, Bridge 2 Rehabilitation 6,000 3 (Base Construction Allocation - $6,000) 4 (15) Franklin Township, T-356, Mount 5 Olivet Road Bridge over Unnamed 6 Tributary of Big Elk Creek, Bridge 7 Rehabilitation 9,000 8 (Base Construction Allocation - $7,000) 9 (Design and Contingencies - $2,000) 10 (16) North Coventry Township, South Keim 11 Street, Bridge No.270 over Small Run, 12 Bridge Replacement 510,000 13 (Base Construction Allocation - 14 $150,000) 15 (Land Allocation - $10,000) 16 (Design and Contingencies - $350,000) 17 (b) State Bridges 18 (1) SR 1010, Swedesford Road Bridge over 19 US 422, Drummers Lane and Warner Road, 20 Tredyffrin, Chester County, Upper 21 Merion, Montgomery County, Bridge 22 Replacement 6,795,000 23 (Base Construction Allocation - 24 $6,210,000) 25 (Land Allocation - $180,000) 26 (Design and Contingencies - $405,000) 27 (2) SR 1045, Hares Hill Road Bridge over 28 French Creek, East Pikeland Township, 29 Bridge Rehabilitation 1,000,000 30 (Base Construction Allocation - 19990S0504B0514 - 157 -
1 $740,000) 2 (Land Allocation - $60,000) 3 (Design and Contingencies - $200,000) 4 (3) SR 3014, Lees Road Bridge over Black 5 Run, West Nottingham Township, Bridge 6 Replacement 1,125,000 7 (Base Construction Allocation - 8 $850,000) 9 (Land Allocation - $75,000) 10 (Design and Contingencies - $200,000) 11 (4) SR 3030, Street Road Bridge over 12 Octoraro Creek, Upper Oxford Township, 13 Bridge Replacement 1,875,000 14 (Base Construction Allocation - 15 $1,600,000) 16 (Land Allocation - $75,000) 17 (Design and Contingencies - $200,000) 18 (5) SR 0003, Gay Street Bridge over 19 Abandoned Conrail, West Chester 20 Borough, Bridge Removal 180,000 21 (Base Construction Allocation - 22 $150,000) 23 (Land Allocation - $10,000) 24 (Design and Contingencies - $20,000) 25 (6) SR 0842, Shaws Bridges (Two Bridges) 26 over Branch of Brandywine Creek, East 27 Bradford and Pocopson Townships, Bridge 28 Replacement 1,500,000 29 (Base Construction Allocation - 30 $1,288,000) 19990S0504B0514 - 158 -
1 (Land Allocation - $100,000) 2 (Design and Contingencies - $112,000) 3 (7) SR 0842, Bridge Road Bridge over East 4 Branch of Brandywine Creek, East 5 Bradford Township, Bridge Painting 214,000 6 (Base Construction Allocation - 7 $186,000) 8 (Design and Contingencies - $28,000) 9 (8) SR 1049, Rapp's Dam Covered Bridge, 10 East Pikeland Township, Bridge 11 Painting 47,000 12 (Base Construction Allocation - 13 $41,000) 14 (Design and Contingencies - $6,000) 15 (9) SR 2011, Phoenixville Pike Bridge 16 under Abandoned Penn Central Railroad, 17 West Goshen Township, Bridge Removal 125,000 18 (Base Construction Allocation - 19 $100,000) 20 (Land Allocation - $10,000) 21 (Design and Contingencies - $15,000) 22 (10) SR 2018, Green Hill Road Bridge under 23 Abandoned Penn Central Railroad, West 24 Goshen Township, Bridge Removal 125,000 25 (Base Construction Allocation - 26 $100,000) 27 (Land Allocation - $10,000) 28 (Design and Contingencies - $15,000) 29 (11) SR 3045, Springdell Road Bridge under 30 Abandoned Penn Central Railroad, West 19990S0504B0514 - 159 -
1 Marborough Township, Bridge Removal 125,000 2 (Base Construction Allocation - 3 $100,000) 4 (Land Allocation - $10,000) 5 (Design and Contingencies - $15,000) 6 (12) SR 3049, Hilltop View Road Bridge 7 over Buck and Doe Run Creek, Newlin 8 Township, Bridge Replacement 1,450,000 9 (Base Construction Allocation - 10 $1,300,000) 11 (Land Allocation - $50,000) 12 (Design and Contingencies - $100,000) 13 (13) SR 1012, Bridge over Trout Creek, 14 Tredyffrin Township, Bridge 15 Replacement 850,000 16 (Base Construction Allocation - 17 $550,000) 18 (Land Allocation - $50,000) 19 (Design and Contingencies - $250,000) 20 (14) SR 0113, Gay Street Bridge over 21 French Creek, Phoenixville Borough, 22 Bridge Replacement 10,200,000 23 (Base Construction Allocation - 24 $9,000,000) 25 (Land Allocation - $200,000) 26 (Design and Contingencies - $1,000,000) 27 Section 20. Clarion County. 28 (a) Local Bridges 29 (1) Beaver Township, T-400, Canoe Creek 30 Bridge over Canoe Creek, Bridge 19990S0504B0514 - 160 -
1 Replacement 380,000 2 (Base Construction Allocation - 3 $300,000) 4 (Land Allocation - $10,000) 5 (Design and Contingencies - $70,000) 6 (2) Beaver Township, T-422, Deer Creek 7 Bridge over Deer Creek, Bridge 8 Replacement 540,000 9 (Base Construction Allocation - 10 $450,000) 11 (Land Allocation - $30,000) 12 (Design and Contingencies - $60,000) 13 (3) Clarion and Millcreek Townships, T- 14 490, Mill Creek Bridge over Mill Creek, 15 Bridge Replacement 540,000 16 (Base Construction Allocation - 17 $450,000) 18 (Land Allocation - $10,000) 19 (Design and Contingencies - $80,000) 20 (4) Elk Township, T-424, Deer Creek Bridge 21 over Deer Creek, Bridge Replacement 620,000 22 (Base Construction Allocation - 23 $500,000) 24 (Land Allocation - $20,000) 25 (Design and Contingencies - $100,000) 26 (5) Farmington Township, T-562, Walley Run 27 Bridge over Walley Run, Bridge 28 Replacement 375,000 29 (Base Construction Allocation - 30 $300,000) 19990S0504B0514 - 161 -
1 (Land Allocation - $5,000) 2 (Design and Contingencies - $70,000) 3 (6) Knox Township, T-850, Toby Creek 4 Bridge over Toby Creek, Bridge 5 Replacement 480,000 6 (Base Construction Allocation - 7 $400,000) 8 (Land Allocation - $20,000) 9 (Design and Contingencies - $60,000) 10 (7) Knox Township, T-600, Licking Creek 11 Bridge over Licking Creek, Bridge 12 Replacement 445,000 13 (Base Construction Allocation - 14 $350,000) 15 (Land Allocation - $15,000) 16 (Design and Contingencies - $80,000) 17 (8) Madison Township, T-460, Red Bank 18 Creek Bridge over Tributary of Red Bank 19 Creek, Bridge Replacement 390,000 20 (Base Construction Allocation - 21 $300,000) 22 (Land Allocation - $20,000) 23 (Design and Contingencies - $70,000) 24 (9) Porter Township, T-462, Fiddlers Run 25 Bridge over Fiddlers Run, Bridge 26 Replacement 390,000 27 (Base Construction Allocation - 28 $300,000) 29 (Land Allocation - $10,000) 30 (Design and Contingencies - $80,000) 19990S0504B0514 - 162 -
1 (10) Porter Township, T-472, Leatherwood 2 Creek Bridge over Leatherwood Creek, 3 Bridge Replacement 455,000 4 (Base Construction Allocation - 5 $375,000) 6 (Land Allocation - $20,000) 7 (Design and Contingencies - $60,000) 8 (11) Porter Township, T-750, Leisure Run 9 Bridge over Leisure Run, Bridge 10 Replacement 390,000 11 (Base Construction Allocation - 12 $300,000) 13 (Land Allocation - $10,000) 14 (Design and Contingencies - $80,000) 15 (12) Red Bank Township, T-840, Beaver 16 Creek Bridge over Beaver Creek, Bridge 17 Replacement 420,000 18 (Base Construction Allocation - 19 $350,000) 20 (Land Allocation - $15,000) 21 (Design and Contingencies - $55,000) 22 (13) Red Bank Township, T-508, County 23 Bridge No.46, Pine Creek Bridge over 24 Pine Creek, Bridge Replacement 378,000 25 (Base Construction Allocation - 26 $300,000) 27 (Land Allocation - $8,000) 28 (Design and Contingencies - $70,000) 29 (14) Richland Township, T-382, Turkey Run 30 Bridge over Turkey Run, Bridge 19990S0504B0514 - 163 -
1 Replacement 360,000 2 (Base Construction Allocation - 3 $300,000) 4 (Land Allocation - $10,000) 5 (Design and Contingencies - $50,000) 6 (15) Richland Township, T-382, Turkey Run 7 Bridge over Turkey Run, Bridge 8 Replacement 360,000 9 (Base Construction Allocation - 10 $300,000) 11 (Land Allocation - $10,000) 12 (Design and Contingencies - $50,000) 13 (16) Sligo Borough, Madison Street Bridge 14 over Little Licking Creek, Bridge 15 Replacement 445,000 16 (Base Construction Allocation - 17 $350,000) 18 (Land Allocation - $15,000) 19 (Design and Contingencies - $80,000) 20 (17) Beaver Township, T-332, Bridge No.17 21 over Beaver Creek, Bridge Replacement 560,000 22 (Base Construction Allocation - 23 $400,000) 24 (Land Allocation - $10,000) 25 (Design and Contingencies - $150,000) 26 (18) Beaver Township, T-385 over Canoe 27 Creek, Bridge Replacement 490,000 28 (Base Construction Allocation - 29 $320,000) 30 (Land Allocation - $80,000) 19990S0504B0514 - 164 -
1 (Design and Contingencies - $90,000) 2 (19) Highland Township, T-573 over Toby 3 Creek, Bridge Replacement 500,000 4 (Base Construction Allocation - 5 $360,000) 6 (Land Allocation - $40,000) 7 (Design and Contingencies - $100,000) 8 (20) Knox Township, T-850 over Step Creek, 9 Bridge Replacement 240,000 10 (Base Construction Allocation - 11 $180,000) 12 (Land Allocation - $20,000) 13 (Design and Contingencies - $40,000) 14 (21) Perry Township, T-301, Bridge 15 Replacement 200,000 16 (Base Construction Allocation - 17 $130,000) 18 (Land Allocation - $30,000) 19 (Design and Contingencies - $40,000) 20 (22) Millcreek Township, T-564 over Little 21 Mill Creek, Bridge Replacement 480,000 22 (Base Construction Allocation - 23 $400,000) 24 (Land Allocation - $20,000) 25 (Design and Contingencies - $60,000) 26 (23) Paint Township, T-578 over Step 27 Creek, Bridge Replacement 500,000 28 (Base Construction Allocation - 29 $400,000) 30 (Land Allocation - $20,000) 19990S0504B0514 - 165 -
1 (Design and Contingencies - $80,000) 2 (24) Monroe Township, T-486, County Bridge 3 No.22 over Piney Creek, Bridge 4 Replacement 480,000 5 (Base Construction Allocation - 6 $400,000) 7 (Land Allocation - $10,000) 8 (Design and Contingencies - $70,000) 9 (25) Clarion Township, T-532 over Brush 10 Run, Bridge Replacement 245,000 11 (Base Construction Allocation - 12 $200,000) 13 (Land Allocation - $10,000) 14 (Design and Contingencies - $35,000) 15 (26) Clarion Township, T-561 over Jones 16 Run, Bridge Replacement 245,000 17 (Base Construction Allocation - 18 $200,000) 19 (Land Allocation - $10,000) 20 (Design and Contingencies - $35,000) 21 (27) Elk Township, T-582 over Mahles Run, 22 Bridge Replacement 245,000 23 (Base Construction Allocation - 24 $200,000) 25 (Land Allocation - $10,000) 26 (Design and Contingencies - $35,000) 27 (28) Farmington Township, T-609 over Engle 28 Run, Bridge Replacement 245,000 29 (Base Construction Allocation - 30 $200,000) 19990S0504B0514 - 166 -
1 (Land Allocation - $10,000) 2 (Design and Contingencies - $35,000) 3 (29) Paint Township, T-577 over Toby 4 Creek, Bridge Replacement 106,000 5 (Base Construction Allocation - 6 $100,000) 7 (Land Allocation - $1,000) 8 (Design and Contingencies - $5,000) 9 (30) Paint Township, T-576 over Toby 10 Creek, Bridge Replacement 106,000 11 (Base Construction Allocation - 12 $100,000) 13 (Land Allocation - $1,000) 14 (Design and Contingencies - $5,000) 15 (31) Beaver Township, T-405 over Canoe 16 Creek, Bridge Replacement 106,000 17 (Base Construction Allocation - 18 $100,000) 19 (Land Allocation - $1,000) 20 (Design and Contingencies - $5,000) 21 (32) Beaver Township, T-411 over Boyd Run, 22 Bridge Replacement 106,000 23 (Base Construction Allocation - 24 $100,000) 25 (Land Allocation - $1,000) 26 (Design and Contingencies - $5,000) 27 (33) Elk Township, T-424 over Deer Creek, 28 Bridge Replacement 250,000 29 (Base Construction Allocation - 30 $200,000) 19990S0504B0514 - 167 -
1 (Land Allocation - $10,000) 2 (Design and Contingencies - $40,000) 3 (34) Highland Township, T-577, Bridge over 4 Toby Creek, Bridge Replacement 518,000 5 (Base Construction Allocation - 6 $380,000) 7 (Land Allocation - $8,000) 8 (Design and Contingencies - $130,000) 9 (35) Beaver Township, T-423, Bridge over 10 Canoe Creek, Bridge Replacement 510,000 11 (Base Construction Allocation - 12 $400,000) 13 (Land Allocation - $10,000) 14 (Design and Contingencies - $100,000) 15 (36) Elk Township, T-418, Bridge over Deer 16 Creek, Bridge Replacement 380,000 17 (Base Construction Allocation - 18 $300,000) 19 (Land Allocation - $10,000) 20 (Design and Contingencies - $70,000) 21 (37) Paint Township, T-582, Bridge over 22 Little Paint Creek, Bridge Replacement 424,000 23 (Base Construction Allocation - 24 $350,000) 25 (Land Allocation - $9,000) 26 (Design and Contingencies - $65,000) 27 (38) Ashland Township, T-863, Bridge over 28 Little Canoe Creek, Bridge Replacement 330,000 29 (Base Construction Allocation - 30 $200,000) 19990S0504B0514 - 168 -
1 (Land Allocation - $10,000) 2 (Design and Contingencies - $120,000) 3 (39) Beaver Township, T-325, Schettler 4 Road Bridge over Canoe Creek, Bridge 5 Replacement 395,000 6 (Base Construction Allocation - 7 $250,000) 8 (Land Allocation - $15,000) 9 (Design and Contingencies - $130,000) 10 (40) Madison Township, T-442, Bridge No.34 11 over Wildcat Run, Bridge Replacement 425,000 12 (Base Construction Allocation - 13 $275,000) 14 (Land Allocation - $10,000) 15 (Design and Contingencies - $140,000) 16 (41) Madison Township, T-689, Bridge No.33 17 over Wildcat Run, Bridge Replacement 460,000 18 (Base Construction Allocation - 19 $300,000) 20 (Land Allocation - $10,000) 21 (Design and Contingencies - $150,000) 22 (42) Madison Township, T-880, Bridge 23 No.2050 over Turkey Run, Bridge 24 Replacement 330,000 25 (Base Construction Allocation - 26 $200,000) 27 (Land Allocation - $10,000) 28 (Design and Contingencies - $120,000) 29 (43) Limestone Township, T-540, Little 30 Piney Creek Bridge over Little Piney 19990S0504B0514 - 169 -
1 Creek, Bridge Replacement 145,000 2 (Base Construction Allocation - 3 $112,000) 4 (Land Allocation - $8,000) 5 (Design and Contingencies - $25,000) 6 (44) Clarion Township, T-561, Bridge 7 Washout over Jones Run, Bridge 8 Replacement 245,000 9 (Base Construction Allocation - 10 $200,000) 11 (Land Allocation - $10,000) 12 (Design and Contingencies - $35,000) 13 (45) Elk Township, T-424, Deer Creek 14 Bridge over Deer Creek, Bridge 15 Replacement 620,000 16 (Base Construction Allocation - 17 $500,000) 18 (Land Allocation - $20,000) 19 (Design and Contingencies - $100,000) 20 (46) Elk Township, T-424, Culvert over 21 Deer Creek, Bridge Replacement 250,000 22 (Base Construction Allocation - 23 $200,000) 24 (Land Allocation - $10,000) 25 (Design and Contingencies - $40,000) 26 (47) Millcreek Township, T-564, Little 27 Mill Creek Bridge over Little Mill 28 Creek, Bridge Replacement 480,000 29 (Base Construction Allocation - 30 $400,000) 19990S0504B0514 - 170 -
1 (Land Allocation - $20,000) 2 (Design and Contingencies - $60,000) 3 (48) Paint Township, T-578, Step Creek 4 Bridge over Step Creek, Bridge 5 Replacement 360,000 6 (Base Construction Allocation - 7 $300,000) 8 (Land Allocation - $10,000) 9 (Design & Contingencies - $50,000) 10 (49) Paint Township, T-578, Steiner Road 11 Bridge over Step Creek, Bridge 12 Replacement 500,000 13 (Base Construction Allocation - 14 $400,000) 15 (Land Allocation - $20,000) 16 (Design and Contingencies - $80,000) 17 (b) State Bridges 18 (1) SR 0058, Callensburg Bridge over 19 Clarion River, Licking Township, Bridge 20 Painting 365,000 21 (Base Construction Allocation - 22 $350,000) 23 (Design and Contingencies - $15,000) 24 (2) SR 0080, Beaver Creek Eastbound Bridge 25 over Beaver Creek, Beaver Township, 26 Bridge Painting 390,000 27 (Base Construction Allocation - 28 $375,000) 29 (Design and Contingencies - $15,000) 30 (3) SR 0080, Beaver Creek Westbound Bridge 19990S0504B0514 - 171 -
1 over Beaver Creek, Beaver Township, 2 Bridge Painting 390,000 3 (Base Construction Allocation - 4 $375,000) 5 (Design and Contingencies - $15,000) 6 (4) SR 0080, Canoe Creek Eastbound Bridge 7 over Canoe Creek, Beaver Township, 8 Bridge Painting 1,230,000 9 (Base Construction Allocation - 10 $1,200,000) 11 (Design and Contingencies - $30,000) 12 (5) SR 0080, Canoe Creek Westbound Bridge 13 over Canoe Creek, Beaver Township, 14 Bridge Painting 1,290,000 15 (Base Construction Allocation - 16 $1,260,000) 17 (Design and Contingencies - $30,000) 18 (6) SR 0080, TR 558 Bridge over I-80, 19 Clarion Township, Bridge Painting 195,000 20 (Base Construction Allocation - 21 $180,000) 22 (Design and Contingencies - $15,000) 23 (7) SR 0322, Exit 11 Bridge over I-80, 24 Clarion Township, Clarion Bridge 25 Painting 205,000 26 (Base Construction Allocation - 27 $190,000) 28 (Design and Contingencies - $15,000) 29 (8) SR 0536, Mayport Bridge over Redbank 30 Creek, Red Bank Township, Bridge 19990S0504B0514 - 172 -
1 Painting 215,000 2 (Base Construction Allocation - 3 $200,000) 4 (Design and Contingencies - $15,000) 5 (9) SR 1009, Brush Creek Bridge over Brush 6 Creek, Clarion Township, Bridge 7 Painting 70,000 8 (Base Construction Allocation - 9 $55,000) 10 (Design and Contingencies - $15,000) 11 (10) SR 2001, Piney Creek Bridge over 12 Piney Creek, Limestone Township, Bridge 13 Painting 85,000 14 (Base Construction Allocation - 15 $70,000) 16 (Design and Contingencies - $15,000) 17 (11) SR 2001, Little Piney Creek Bridge 18 over Little Piney Creek, Limestone 19 Township, Bridge Painting 70,000 20 (Base Construction Allocation - 21 $55,000) 22 (Design and Contingencies - $15,000) 23 (12) SR 2005, Glade Run Bridge over Glade 24 Run, Limestone Township, Bridge 25 Painting 60,000 26 (Base Construction Allocation - 27 $45,000) 28 (Design and Contingencies - $15,000) 29 (13) SR 2007, Licking Creek Bridge over 30 Licking Creek, Monroe Township, Bridge 19990S0504B0514 - 173 -
1 Painting 75,000 2 (Base Construction Allocation - 3 $60,000) 4 (Design and Contingencies - $15,000) 5 (14) SR 2009, Lawsonham Bridge over 6 Redbank Creek, Madison Township, Bridge 7 Painting 195,000 8 (Base Construction Allocation - 9 $180,000) 10 (Design and Contingencies - $15,000) 11 (15) SR 2009, Wildcat Run Bridge over 12 Wildcat Run, Madison Township, Bridge 13 Painting 85,000 14 (Base Construction Allocation - 15 $70,000) 16 (Design and Contingencies - $15,000) 17 (16) SR 2015, Little Piney Creek Bridge 18 over Little Piney Creek, Limestone 19 Township, Bridge Painting 60,000 20 (Base Construction Allocation - 21 $45,000) 22 (Design and Contingencies - $15,000) 23 (17) SR 3020, Alum Rock Bridge over Turkey 24 Run, Richland Township, Bridge 25 Painting 75,000 26 (Base Construction Allocation - 27 $60,000) 28 (Design and Contingencies - $15,000) 29 (18) SR 4003, Turkey Run Bridge over 30 Turkey Run, Richland Township, Bridge 19990S0504B0514 - 174 -
1 Painting 65,000 2 (Base Construction Allocation - 3 $50,000) 4 (Design and Contingencies - $15,000) 5 (19) SR 4005, Canoe Creek Bridge over 6 Canoe Creek, Beaver Township, Bridge 7 Painting 70,000 8 (Base Construction Allocation - 9 $55,000) 10 (Design and Contingencies - $15,000) 11 (20) SR 0208, Conrail Overpass, Elk 12 Township, Bridge Removal 120,000 13 (Base Construction Allocation - 14 $80,000) 15 (Land Allocation - $10,000) 16 (Design and Contingencies - $30,000) 17 (21) SR 0322, Conrail Overpass, Elk 18 Township, Bridge Removal 250,000 19 (Base Construction Allocation - 20 $200,000) 21 (Land Allocation - $10,000) 22 (Design and Contingencies - $40,000) 23 (22) SR 1011, Lake Erie, Franklin and 24 Clarion Railroad Overpass, Clarion 25 Township, Bridge Removal 12,000 26 (Base Construction Allocation - 27 $10,000) 28 (Design and Contingencies - $2,000) 29 (23) SR 0066, Bridge over Piney Creek, 30 Limestone Township, Bridge Replacement 650,000 19990S0504B0514 - 175 -
1 (Base Construction Allocation - 2 $500,000) 3 (Land Allocation - $20,000) 4 (Design and Contingencies - $130,000) 5 (24) SR 0066, Bridge over Little Piney 6 Creek, Limestone Township, Bridge 7 Replacement 600,000 8 (Base Construction Allocation - 9 $450,000) 10 (Land Allocation - $20,000) 11 (Design and Contingencies - $130,000) 12 (25) SR 0068, Bridge over Brush Run, 13 Monroe Township, Bridge Replacement 650,000 14 (Base Construction Allocation - 15 $500,000) 16 (Land Allocation - $20,000) 17 (Design and Contingencies - $130,000) 18 (26) SR 0208, Bridge over Canoe Creek, 19 Beaver Township, Bridge Replacement 550,000 20 (Base Construction Allocation - 21 $400,000) 22 (Land Allocation - $20,000) 23 (Design and Contingencies - $130,000) 24 (27) SR 2001, Bridge over Little Piney 25 Creek, Limestone Township, Bridge 26 Replacement 490,000 27 (Base Construction Allocation - 28 $350,000) 29 (Land Allocation - $20,000) 30 (Design and Contingencies - $120,000) 19990S0504B0514 - 176 -
1 (28) SR 0208, SR 0208 over Deer Creek, Elk 2 Township, Bridge Replacement 505,000 3 (Base Construction Allocation - 4 $450,000) 5 (Land Allocation - $5,000) 6 (Design and Contingencies - $50,000) 7 (29) SR 2007, SR 2007 over Deer Creek, 8 Beaver Township, Bridge Replacement 455,000 9 (Base Construction Allocation - 10 $400,000) 11 (Land Allocation - $5,000) 12 (Design and Contingencies - $50,000) 13 (30) SR 4005, SR 4005 over Canoe Creek, 14 Beaver Township, Bridge Replacement 405,000 15 (Base Construction Allocation - 16 $350,000) 17 (Land Allocation - $5,000) 18 (Design and Contingencies - $50,000) 19 (31) SR 4008, SR 4008 over Paint Creek, 20 Knox Township, Bridge Replacement 505,000 21 (Base Construction Allocation - 22 $450,000) 23 (Land Allocation - $5,000) 24 (Design and Contingencies - $50,000) 25 (32) SR 0028, Redbank Creek Bridge over 26 Tributary of Redbank Creek, Redbank 27 Township, Bridge Rehabilitation 1,450,000 28 (Base Construction Allocation - 29 $1,000,000) 30 (Land Allocation - $100,000) 19990S0504B0514 - 177 -
1 (Design and Contingencies - $350,000) 2 (33) SR 0028, Pine Creek Bridge over Pine 3 Creek, Redbank Township, Bridge 4 Rehabilitation 1,450,000 5 (Base Construction Allocation - 6 $1,000,000) 7 (Land Allocation - $100,000) 8 (Design and Contingencies - $350,000) 9 (34) SR 0028, Leisure Run Bridge over 10 Leisure Run, Redbank Township, Bridge 11 Replacement 1,450,000 12 (Base Construction Allocation - 13 $1,000,000) 14 (Land Allocation - $100,000) 15 (Design and Contingencies - $350,000) 16 (35) SR 0028, Walker Run Bridge over 17 Walker Run, Redbank Township, Bridge 18 Rehabilitation 1,450,000 19 (Base Construction Allocation - 20 $1,000,000) 21 (Land Allocation - $100,000) 22 (Design and Contingencies - $350,000) 23 (36) SR 0066, Little Piney Bridge over 24 Little Piney Creek, Clarion Township, 25 Bridge Rehabilitation 1,050,000 26 (Base Construction Allocation - 27 $750,000) 28 (Land Allocation - $50,000) 29 (Design and Contingencies - $250,000) 30 (37) SR 0066, Leisure Run Bridge over 19990S0504B0514 - 178 -
1 Leisure Run, Redbank Township, Bridge 2 Rehabilitation 1,050,000 3 (Base Construction Allocation - 4 $750,000) 5 (Land Allocation - $50,000) 6 (Design and Contingencies - $250,000) 7 (38) SR 0068, Trout Run Bridge over Trout 8 Run, Clarion Township, Bridge 9 Rehabilitation 1,050,000 10 (Base Construction Allocation - 11 $750,000) 12 (Land Allocation - $50,000) 13 (Design and Contingencies - $250,000) 14 (39) SR 0068, Craigs Run Bridge over 15 Craigs Run, Monroe Township, Bridge 16 Replacement 1,050,000 17 (Base Construction Allocation - 18 $750,000) 19 (Land Allocation - $50,000) 20 (Design and Contingencies - $250,000) 21 (40) SR 0068, Craigs Run Bridge over 22 Craigs Run, Monroe Township, Bridge 23 Rehabilitation 1,050,000 24 (Base Construction Allocation - 25 $750,000) 26 (Land Allocation - $50,000) 27 (Design and Contingencies - $250,000) 28 (41) SR 0068, Reids Run Bridge over Reids 29 Run, Monroe Township, Bridge 30 Rehabilitation 1,050,000 19990S0504B0514 - 179 -
1 (Base Construction Allocation - 2 $750,000) 3 (Land Allocation - $50,000) 4 (Design and Contingencies - $250,000) 5 (42) SR 0068, Brush Run Bridge over Brush 6 Run, Monroe Township, Bridge 7 Replacement 1,050,000 8 (Base Construction Allocation - 9 $750,000) 10 (Land Allocation - $50,000) 11 (Design and Contingencies - $250,000) 12 (43) SR 0068, Licking Creek Bridge over 13 Licking Creek, Sligo Borough, Bridge 14 Rehabilitation 1,050,000 15 (Base Construction Allocation - 16 $750,000) 17 (Land Allocation - $50,000) 18 (Design and Contingencies - $250,000) 19 (44) SR 0080, I-80 Bridge over Coal Run, 20 Beaver Township, Bridge Rehabilitation 1,450,000 21 (Base Construction Allocation - 22 $1,000,000) 23 (Land Allocation - $100,000) 24 (Design and Contingencies - $350,000) 25 (45) SR 0080, I-80 Bridge over Deer Creek, 26 Beaver Township, Bridge Rehabilitation 1,450,000 27 (Base Construction Allocation - 28 $1,000,000) 29 (Land Allocation - $100,000) 30 (Design and Contingencies - $350,000) 19990S0504B0514 - 180 -
1 (46) SR 0080, I-80 Bridge over Tributary 2 of Clarion River, Beaver Township, 3 Bridge Rehabilitation 1,450,000 4 (Base Construction Allocation - 5 $1,000,000) 6 (Land Allocation - $100,000) 7 (Design and Contingencies - $350,000) 8 (47) SR 0080, I-80 Bridge, Westbound over 9 SR 2014, Clarion Township, Bridge 10 Rehabilitation 1,450,000 11 (Base Construction Allocation - 12 $1,000,000) 13 (Land Allocation - $100,000) 14 (Design and Contingencies - $350,000) 15 (48) SR 0080, I-80 Bridge, Eastbound over 16 SR 2014, Clarion Township, Bridge 17 Rehabilitation 1,450,000 18 (Base Construction Allocation - 19 $1,000,000) 20 (Land Allocation - $100,000) 21 (Design and Contingencies - $350,000) 22 (49) SR 0080, I-80 Bridge over Boyd Run, 23 Paint Township, Bridge Rehabilitation 1,450,000 24 (Base Construction Allocation - 25 $1,000,000) 26 (Land Allocation - $100,000) 27 (Design and Contingencies - $350,000) 28 (50) SR 0080, I-80 Bridge over Branch of 29 Clarion River, Paint Township, Bridge 30 Rehabilitation 1,450,000 19990S0504B0514 - 181 -
1 (Base Construction Allocation - 2 $1,000,000) 3 (Land Allocation - $100,000) 4 (Design and Contingencies - $350,000) 5 (51) SR 0080, I-80 Bridge over Turkey Run, 6 Richland Township, Bridge 7 Rehabilitation 1,450,000 8 (Base Construction Allocation - 9 $1,000,000) 10 (Land Allocation - $100,000) 11 (Design and Contingencies - $350,000) 12 (52) SR 2001, Piney Creek Bridge over 13 Piney Creek, Limestone Township, Bridge 14 Replacement 620,000 15 (Base Construction Allocation - 16 $500,000) 17 (Land Allocation - $20,000) 18 (Design and Contingencies - $100,000) 19 Section 21. Clearfield County. 20 (a) Local Bridges 21 (1) Knox Township, T-565 Bridge over Potts 22 Run, Bridge Replacement 510,000 23 (Base Construction Allocation - 24 $350,000) 25 (Land Allocation - $10,000) 26 (Design and Contingencies - $150,000) 27 (2) Houtzdale Borough, McAteer Street 28 Bridge, Bridge Replacement 430,000 29 (Base Construction Allocation - 30 $270,000) 19990S0504B0514 - 182 -
1 (Land Allocation - $20,000) 2 (Design and Contingencies - $140,000) 3 (3) Penn Township, T-461 over Bell Run, 4 Bridge Replacement 106,000 5 (Base Construction Allocation - 6 $100,000) 7 (Land Allocation - $1,000) 8 (Design and Contingencies - $5,000) 9 (4) City of Dubois, Washington Avenue 10 Bridge over Pentz Run, Bridge 11 Replacement 63,000 12 (Base Construction Allocation - 13 $45,000) 14 (Land Allocation - $3,000) 15 (Design and Contingencies - $15,000) 16 (5) Sandy Township, T-854, Narrows Creek 17 Bridge over Narrows Creek, Bridge 18 Replacement 320,000 19 (Base Construction Allocation - 20 $240,000) 21 (Land Allocation - $16,000) 22 (Design and Contingencies - $64,000) 23 (6) Brady Township, T-353, Bridge over 24 East Branch of Mahoning Creek, Bridge 25 Replacement 344,000 26 (Base Construction Allocation - 27 $272,000) 28 (Land Allocation - $8,000) 29 (Design and Contingencies - $64,000) 30 (7) Union Township, T-372, Conrail Bridge 19990S0504B0514 - 183 -
1 over Conrail, Bridge Removal 515,000 2 (Base Construction Allocation - 3 $400,000) 4 (Land Allocation - $15,000) 5 (Design and Contingencies - $100,000) 6 (b) State Bridges 7 (1) SR 0879, Bridge over US 322 near 8 Clearfield Mall, Lawrence Township, 9 Bridge Painting 644,000 10 (Base Construction Allocation - 11 $614,000) 12 (Design and Contingencies - $30,000) 13 (2) SR 0729, Bridge over Muddy Run, 14 Beccaria Township, Bridge Painting 35,000 15 (Base Construction Allocation - 16 $30,000) 17 (Design and Contingencies - $5,000) 18 (3) SR 0879, Bridge over Susquehanna 19 River, Lawrence Township, Bridge 20 Painting 183,000 21 (Base Construction Allocation - 22 $163,000) 23 (Design and Contingencies - $20,000) 24 (4) SR 0970, Bridge over Moshannon Creek, 25 Osceola Mills, Bridge Painting 145,000 26 (Base Construction Allocation - 27 $120,000) 28 (Design and Contingencies - $25,000) 29 (5) SR 0970, Bridge over Susquehanna 30 River, Village of Shawville, Bridge 19990S0504B0514 - 184 -
1 Painting 163,000 2 (Base Construction Allocation - 3 $143,000) 4 (Design and Contingencies - $20,000) 5 (6) SR 1009, Bridge over Alder Run, Morris 6 Township, Bridge Painting 18,000 7 (Base Construction Allocation - 8 $15,000) 9 (Design and Contingencies - $3,000) 10 (7) SR 1014, Bridge over Alder Run, Graham 11 Township, Bridge Painting 18,000 12 (Base Construction Allocation - 13 $15,000) 14 (Design and Contingencies - $3,000) 15 (8) SR 2010, Bridge over Beaver Run, 16 Woodward Township, Bridge Painting 18,000 17 (Base Construction Allocation - 18 $15,000) 19 (Design and Contingencies - $3,000) 20 (9) SR 2024, Bridge over Conrail, Pike 21 Township, Bridge Painting 28,000 22 (Base Construction Allocation - 23 $24,000) 24 (Design and Contingencies - $4,000) 25 (10) SR 3001, Bridge over Chest Creek, 26 Mahaffey Borough, Bridge Replacement 1,750,000 27 (Base Construction Allocation - 28 $1,300,000) 29 (Land Allocation - $150,000) 30 (Design and Contingencies - $300,000) 19990S0504B0514 - 185 -
1 (11) SR 3012, Bridge over Matthews Run, 2 Beccaria Township, Bridge Painting 18,000 3 (Base Construction Allocation - 4 $15,000) 5 (Design and Contingencies - $3,000) 6 (12) SR 3012, Bridge over Clearfield 7 Creek, Beccaria Township, Bridge 8 Painting 100,000 9 (Base Construction Allocation - 10 $90,000) 11 (Design and Contingencies - $10,000) 12 (13) SR 0219, SR 0219 over Bear Run, Bell 13 Township, Bridge Replacement 505,000 14 (Base Construction Allocation - 15 $450,000) 16 (Land Allocation - $5,000) 17 (Design and Contingencies - $50,000) 18 (14) SR 2014, Bridge over Coal Run, 19 Decatur Township, Bridge Replacement 692,000 20 (Base Construction Allocation - 21 $512,000) 22 (Land Allocation - $30,000) 23 (Design and Contingencies - $150,000) 24 (15) SR 3012, Bridge over Clearfield 25 Creek, Beccaria Township, Bridge 26 Painting 18,000 27 (Base Construction Allocation - 28 $15,000) 29 (Design and Contingencies - $3,000) 30 (16) SR 0255, Bridge over Tyler Run, 19990S0504B0514 - 186 -
1 Village of Hollywood, Huston Township, 2 Bridge Replacement 500,000 3 (Base Construction Allocation - 4 $400,000) 5 (Land Allocation - $20,000) 6 (Design and Contingencies - $80,000) 7 (17) SR 3009, Bridge over Kuhns Run, Bell 8 Township, Bridge Rehabilitation 105,000 9 (Base Construction Allocation - 10 $80,000) 11 (Land Allocation - $5,000) 12 (Design and Contingencies - $20,000) 13 (18) SR 0219, Clear Run Bridge over Clear 14 Run, City of Dubois, Bridge 15 Replacement 760,000 16 (Base Construction Allocation - 17 $600,000) 18 (Land Allocation - $10,000) 19 (Design and Contingencies - $150,000) 20 (19) SR 0219, Bear Creek Bridge over Bear 21 Creek, McGees Mills Township, Bridge 22 Replacement 825,000 23 (Base Construction Allocation - 24 $700,000) 25 (Land Allocation - $25,000) 26 (Design and Contingencies - $100,000) 27 (20) SR 0322, Bridge over Clearfield Creek 28 Lawrence Township, Bridge 29 Rehabilitation 1,400,000 30 (Base Construction Allocation - 19990S0504B0514 - 187 -
1 $1,200,000) 2 (Land Allocation - $50,000) 3 (Design and Contingencies - $150,000) 4 (21) SR 0879, Corman Railroad Bridge over 5 SR 0879, Widen and Flatten Slope, 6 Curwensville Borough, Bridge Removal 1,050,000 7 (Base Construction Allocation - 8 $800,000) 9 (Land Allocation - $100,000) 10 (Design and Contingencies - $150,000) 11 (22) SR 0879, Bridge over Railroad & 12 Susquehanna River, Lawrence Township, 13 Bridge Painting 260,000 14 (Base Construction Allocation - 15 $250,000) 16 (Design and Contingencies - $10,000) 17 (23) SR 0879, Bridge over US 322, Lawrence 18 Township, Bridge Rehabilitation 160,000 19 (Base Construction Allocation - 20 $150,000) 21 (Design and Contingencies - $10,000) 22 (24) SR 0970, Bridge over West Branch of 23 Susquehanna River, Bradford Township 24 and Goshen Township, Bridge Painting 820,000 25 (Base Construction Allocation - 26 $800,000) 27 (Design and Contingencies - $20,000) 28 (25) SR 2024, Rails/Trails Bridge over 29 Rails to Trails, Pike Township, Bridge 30 Painting 135,000 19990S0504B0514 - 188 -
1 (Base Construction Allocation - 2 $130,000) 3 (Design and Contingencies - $5,000) 4 Section 22. Clinton County. 5 (a) Local Bridges 6 (1) Mill Hall Borough, Church Street over 7 Fishing Creek, Bridge Rehabilitation 5,000 8 (Base Construction Allocation - $4,000) 9 (Design and Contingencies - $1,000) 10 (2) Lamar Township, T-352 over Duck Run, 11 Bridge Replacement 440,000 12 (Base Construction Allocation - 13 $350,000) 14 (Land Allocation - $10,000) 15 (Design and Contingencies - $80,000) 16 (3) Bald Eagle Township, T-381, Mill Race 17 Bridge over Mill Race, Bridge 18 Replacement 300,000 19 (Base Construction Allocation - 20 $200,000) 21 (Land Allocation - $20,000) 22 (Design and Contingencies - $80,000) 23 (4) Leidy Township, T-545, Hammersley Fork 24 Bridge over Hammersley Fork, Bridge 25 Replacement 510,000 26 (Base Construction Allocation - 27 $400,000) 28 (Land Allocation - $10,000) 29 (Design and Contingencies - $100,000) 30 (b) State Bridges 19990S0504B0514 - 189 -
1 (1) SR 0044, Bridge over SR 0220, 1 Mile 2 Northeast of Avis, Pine Creek Township, 3 Bridge Painting 580,000 4 (Base Construction Allocation - 5 $525,000) 6 (Design and Contingencies - $55,000) 7 (2) SR 0080, Lamar Interchange (Two 8 Bridges) over PA 64 at Exit 25, Porter 9 Township, Bridge Rehabilitation 4,100,000 10 (Base Construction Allocation - 11 $3,400,000) 12 (Design and Contingencies - $700,000) 13 (3) SR 0144, Bridge over Kettle Creek, 1 14 Mile East of Hammersley Fork, Leidy 15 Township, Bridge Painting 660,000 16 (Base Construction Allocation - 17 $600,000) 18 (Design and Contingencies - $60,000) 19 (4) SR 0044, Pine Creek Bridge over Pine 20 Creek, Grugan Township, Bridge 21 Replacement 2,850,000 22 (Base Construction Allocation - 23 $2,400,000) 24 (Land Allocation - $50,000) 25 (Design and Contingencies - $400,000) 26 (5) SR 0144, Bridge over Kettle Creek, 27 Leidy Township, Bridge Painting 590,000 28 (Base Construction Allocation - 29 $580,000) 30 (Design and Contingencies - $10,000) 19990S0504B0514 - 190 -
1 (6) SR 0144, Hammersley Fork Bridge over 2 Hammersley Fork, Leidy Township, Bridge 3 Painting 130,000 4 (Base Construction Allocation - 5 $125,000) 6 (Design and Contingencies - $5,000) 7 (7) SR 0150, Laurel Run Bridge over Laurel 8 Run, Bald Eagle Township, Bridge 9 Replacement 285,000 10 (Base Construction Allocation - 11 $175,000) 12 (Land Allocation - $10,000) 13 (Design and Contingencies - $100,000) 14 (8) SR 0150, Bald Eagle Creek Bridge over 15 Bald Eagle Creek, Bald Eagle Township, 16 Bridge Replacement 1,370,000 17 (Base Construction Allocation - 18 $1,100,000) 19 (Land Allocation - $20,000) 20 (Design and Contingencies - $250,000) 21 (9) SR 0150, Masden Run Bridge over Masden 22 Run, Beech Creek Township, Bridge 23 Replacement 320,000 24 (Base Construction Allocation - 25 $210,000) 26 (Land Allocation - $10,000) 27 (Design and Contingencies - $100,000) 28 (10) SR 1002, Chatham Run Bridge, Pine 29 Creek Township, Bridge Replacement 475,000 30 (Base Construction Allocation - 19990S0504B0514 - 191 -
1 $345,000) 2 (Land Allocation - $10,000) 3 (Design and Contingencies - $120,000) 4 (11) SR 2004, Big Fishing Creek Bridge 5 over Big Fishing Creek, Porter 6 Township, Bridge Replacement 720,000 7 (Base Construction Allocation - 8 $550,000) 9 (Land Allocation - $20,000) 10 (Design and Contingencies - $150,000) 11 (12) SR 2019, Laurel Run Bridge over 12 Laurel Run, Bald Eagle Township, Bridge 13 Painting 8,000 14 (Base Construction Allocation - $7,000) 15 (Design and Contingencies - $1,000) 16 Section 23. Columbia County. 17 (a) Local Bridges (Reserved) 18 (b) State Bridges 19 (1) SR 0044, Chillisquaque Creek Bridge 20 over Chillisquaque Creek, 3 Miles 21 Northwest of Jerseytown, Bridge 22 Replacement 477,000 23 (Base Construction Allocation - 24 $382,000) 25 (Land Allocation - $24,000) 26 (Design and Contingencies - $71,000) 27 (2) SR 0093, Bridge over North Branch of 28 Briar Creek, Bridge Replacement 350,000 29 (Base Construction Allocation - 30 $275,000) 19990S0504B0514 - 192 -
1 (Land Allocation - $15,000) 2 (Design and Contingencies - $60,000) 3 (3) SR 0093, Briar Creek Bridge over Briar 4 Creek, 3 Miles West of Berwick, Bridge 5 Replacement 392,000 6 (Base Construction Allocation - 7 $315,000) 8 (Land Allocation - $18,000) 9 (Design and Contingencies - $59,000) 10 (4) SR 0239, West Creek Bridge over West 11 Creek, Southeast of Benton and 12 Sugarloaf Townships, Bridge 13 Replacement 670,000 14 (Base Construction Allocation - 15 $536,000) 16 (Land Allocation - $34,000) 17 (Design and Contingencies - $100,000) 18 (5) SR 0442, West Branch Run Bridge over 19 West Branch Run, 1.5 Miles North of 20 Iola, Bridge Replacement 206,000 21 (Base Construction Allocation - 22 $165,000) 23 (Land Allocation - $10,000) 24 (Design and Contingencies - $31,000) 25 (6) SR 1004, Erie-Lackawanna Railroad 26 Bridge, Viaduct over Conrail, South 27 Centre Township, Bridge Replacement 1,900,000 28 (Base Construction Allocation - 29 $1,600,000) 30 (Land Allocation - $110,000) 19990S0504B0514 - 193 -
1 (Design and Contingencies - $190,000) 2 (7) SR 1019, Briar Creek Bridge over Briar 3 Creek, Briar Creek Township, Bridge 4 Replacement 404,000 5 (Base Construction Allocation - 6 $323,000) 7 (Land Allocation - $20,000) 8 (Design and Contingencies - $61,000) 9 (8) SR 4012, Little Hemlock Creek Bridge 10 over Little Hemlock Creek, 10 Miles 11 Southeast of Jerseytown, Bridge 12 Replacement 284,000 13 (Base Construction Allocation - 14 $227,000) 15 (Land Allocation - $14,000) 16 (Design and Contingencies - $43,000) 17 (9) SR 4037, Mud Run Bridge over Mud Run, 18 5 Miles Northwest of Millville Borough, 19 Bridge Replacement 307,000 20 (Base Construction Allocation - 21 $246,000) 22 (Land Allocation - $15,000) 23 (Design and Contingencies - $46,000) 24 (10) SR 0011, Bridge over Fishing Creek, 25 Bridge Painting 530,000 26 (Base Construction Allocation - 27 $520,000) 28 (Design and Contingencies - $10,000) 29 (11) SR 1022, Bridge over Fishing Creek, 30 Bridge Painting 380,000 19990S0504B0514 - 194 -
1 (Base Construction Allocation - 2 $370,000) 3 (Design and Contingencies - $10,000) 4 (12) SR 1022, Bridge over Old Channel, 5 Bridge Painting 125,000 6 (Base Construction Allocation - 7 $115,000) 8 (Design and Contingencies - $10,000) 9 (13) SR 4009, Bridge over Fishing Creek, 10 Bridge Painting 315,000 11 (Base Construction Allocation - 12 $305,000) 13 (Design and Contingencies - $10,000) 14 (14) SR 0042, SR 0042 over Roaring Creek, 15 Conyngham Township, Bridge Replacement 457,000 16 (Base Construction Allocation - 17 $366,000) 18 (Land Allocation - $23,000) 19 (Design and Contingencies - $68,000) 20 (15) SR 0239, SR 0239 over West Creek, 21 Benton Township, Bridge Replacement 760,000 22 (Base Construction Allocation - 23 $560,000) 24 (Land Allocation - $35,000) 25 (Design and Contingencies - $165,000) 26 (16) SR 0254, SR 0254 over Little Fishing 27 Creek, Millville Borough, Bridge 28 Replacement 1,020,000 29 (Base Construction Allocation - 30 $816,000) 19990S0504B0514 - 195 -
1 (Land Allocation - $51,000) 2 (Design and Contingencies - $153,000) 3 (17) SR 0339, SR 0339 over Beaver Run, 4 Beaver Township, Bridge Replacement 320,000 5 (Base Construction Allocation - 6 $256,000) 7 (Land Allocation - $16,000) 8 (Design and Contingencies - $48,000) 9 (18) SR 0487, SR 0487 over Stony Brook, 10 Orange Township, Bridge Replacement 380,000 11 (Base Construction Allocation - 12 $304,000) 13 (Land Allocation - $19,000) 14 (Design and Contingencies - $57,000) 15 (19) SR 1014, SR 1014 over Little Briar 16 Creek, Briar Creek Township, Bridge 17 Replacement 415,000 18 (Base Construction Allocation - 19 $332,000) 20 (Land Allocation - $21,000) 21 (Design and Contingencies - $62,000) 22 (20) SR 1023, SR 1023 over East Briar 23 Creek, Briar Creek Township, Bridge 24 Replacement 520,000 25 (Base Construction Allocation - 26 $466,000) 27 (Land Allocation - $29,000) 28 (Design and Contingencies - $25,000) 29 (21) SR 2003, SR 2003 over Tributary of 30 Roaring Creek, Roaring Creek Township, 19990S0504B0514 - 196 -
1 Bridge Replacement 171,000 2 (Base Construction Allocation - 3 $136,000) 4 (Land Allocation - $10,000) 5 (Design and Contingencies - $25,000) 6 (22) SR 2003, SR 2003 over Tributary of 7 Roaring Creek, Locust Township, Bridge 8 Replacement 245,000 9 (Base Construction Allocation - 10 $196,000) 11 (Land Allocation - $12,000) 12 (Design and Contingencies - $37,000) 13 (23) SR 2009, SR 2009 over Catawissa 14 Creek, Main Township, Bridge 15 Replacement 436,000 16 (Base Construction Allocation - 17 $349,000) 18 (Land Allocation - $22,000) 19 (Design and Contingencies - $65,000) 20 (24) SR 4009, SR 4009 over Little Fishing 21 Creek, Mt. Pleasant Township, Bridge 22 Replacement 1,232,000 23 (Base Construction Allocation - 24 $986,000) 25 (Land Allocation - $61,000) 26 (Design and Contingencies - $185,000) 27 (25) SR 4033, SR 4033 over Wolfhouse Run, 28 Pine Township, Bridge Replacement 252,000 29 (Base Construction Allocation - 30 $202,000) 19990S0504B0514 - 197 -
1 (Land Allocation - $12,000) 2 (Design and Contingencies - $38,000) 3 (26) SR 4045, SR 4045 over Green Creek, 4 Greenwood Township, Bridge Replacement 435,000 5 (Base Construction Allocation - 6 $348,000) 7 (Land Allocation - $22,000) 8 (Design and Contingencies - $65,000) 9 (27) SR 4049, SR 4049 over Coles Creek, 10 Sugarloaf Township, Bridge Replacement 1,095,000 11 (Base Construction Allocation - 12 $876,000) 13 (Land Allocation - $55,000) 14 (Design and Contingencies - $164,000) 15 (28) SR 0080, I-80 Bridge over North 16 Branch of Susquehanna River, Mifflin 17 Township, Bridge Replacement 36,550,000 18 (Base Construction Allocation - 19 $34,000,000) 20 (Land Allocation - $50,000) 21 (Design and Contingencies - $2,500,000) 22 (29) SR 8006, SR 8006 Ramp W Bridge, Lime 23 Ridge Interchange, South Centre 24 Township, Bridge Deck Replacement 700,000 25 (Base Construction Allocation - 26 $600,000) 27 (Design and Contingencies - $100,000) 28 Section 24. Crawford County. 29 (a) Local Bridges 30 (1) Fairfield Township, T-636 over Branch 19990S0504B0514 - 198 -
1 of French Creek, Bridge Replacement 108,000 2 (Base Construction Allocation - 3 $100,000) 4 (Land Allocation - $1,000) 5 (Design and Contingencies - $7,000) 6 (2) Fairfield Township, T-321 Bridge No.1 7 over Branch of French Creek, Bridge 8 Replacement 106,000 9 (Base Construction Allocation - 10 $100,000) 11 (Land Allocation - $1,000) 12 (Design and Contingencies - $5,000) 13 (3) Fairfield Township, T-321 Bridge No.2 14 over Branch of French Creek, Bridge 15 Replacement 106,000 16 (Base Construction Allocation - 17 $100,000) 18 (Land Allocation - $1,000) 19 (Design and Contingencies - $5,000) 20 (4) Spring Township, T-747 over Branch of 21 Conneaut Creek, Bridge Replacement 126,000 22 (Base Construction Allocation - 23 $120,000) 24 (Land Allocation - $1,000) 25 (Design and Contingencies - $5,000) 26 (5) Wayne Township, T-347 over Branch of 27 Powdermill Run, Bridge Replacement 106,000 28 (Base Construction Allocation - 29 $100,000) 30 (Land Allocation - $1,000) 19990S0504B0514 - 199 -
1 (Design and Contingencies - $5,000) 2 (6) Wayne Township, T-457 over Tributary 3 of Lake Creek, Bridge Replacement 106,000 4 (Base Construction Allocation - 5 $100,000) 6 (Land Allocation - $1,000) 7 (Design and Contingencies - $5,000) 8 (7) Vernon Township, T-487, Sportsman's 9 Road Bridge over Watson Run, Bridge 10 Replacement 460,000 11 (Base Construction Allocation - 12 $400,000) 13 (Land Allocation - $10,000) 14 (Design and Contingencies - $50,000) 15 (8) Woodcock Township, T-653, Morris Road 16 Bridge over Conrail, Bridge 17 Replacement 360,000 18 (9) City of Titusville, Walnut Street 19 Bridge over Church Run, Bridge 20 Replacement 360,000 21 (10) Rockdale Township, T-878, Swamp 22 Bridge, Bridge Replacement 360,000 23 (11) Vernon Township, T-487, Middle Road 24 Bridge over Watson Run, Bridge 25 Replacement 400,000 26 (Base Construction Allocation - 27 $360,000) 28 (Design and Contingencies - $40,000) 29 (b) State Bridges 30 (1) SR 0006, SR 0006 over Padan Creek, 19990S0504B0514 - 200 -
1 Conneaut Township, Bridge Replacement 1,004,000 2 (Base Construction Allocation - 3 $784,000) 4 (Land Allocation - $20,000) 5 (Design and Contingencies - $200,000) 6 (2) SR 0006, SR 0006 over French Creek, 7 Woodcock Township, Bridge Replacement 2,325,000 8 (Base Construction Allocation - 9 $1,840,000) 10 (Land Allocation - $20,000) 11 (Design and Contingencies - $465,000) 12 (3) SR 0079, SR 0079 under Maple Drive, 13 Hayfield Township, Bridge Replacement 2,401,000 14 (Base Construction Allocation - 15 $1,901,000) 16 (Land Allocation - $20,000) 17 (Design and Contingencies - $480,000) 18 (4) SR 0089, SR 0089 over Shirley Run, 19 Rome Township, Bridge Replacement 510,000 20 (Base Construction Allocation - 21 $420,000) 22 (Land Allocation - $20,000) 23 (Design and Contingencies - $70,000) 24 (5) SR 0098, SR 0098 over Van Horne Run, 25 Vernon Township, Bridge Replacement 320,000 26 (Base Construction Allocation - 27 $260,000) 28 (Land Allocation - $10,000) 29 (Design and Contingencies - $50,000) 30 (6) SR 0099, SR 0099 over Little 19990S0504B0514 - 201 -
1 Conneauttee Creek, Cambridge Township, 2 Bridge Replacement 950,000 3 (Base Construction Allocation - 4 $700,000) 5 (Land Allocation - $50,000) 6 (Design and Contingencies - $200,000) 7 (7) SR 0099, SR 0099 over Conneaut Creek, 8 Cambridge Township, Bridge Replacement 600,000 9 (Base Construction Allocation - 10 $500,000) 11 (Land Allocation - $30,000) 12 (Design and Contingencies - $70,000) 13 (8) SR 0198, SR 0198 over Carr Run, 14 Woodcock Township, Bridge Replacement 260,000 15 (Base Construction Allocation - 16 $200,000) 17 (Land Allocation - $20,000) 18 (Design and Contingencies - $40,000) 19 (9) SR 0285, SR 0285 over Bennett Run, 20 North Shenango Township, Bridge 21 Replacement 750,000 22 (Base Construction Allocation - 23 $650,000) 24 (Land Allocation - $20,000) 25 (Design and Contingencies - $80,000) 26 (10) SR 1002, SR 1002 over Acker Run, 27 Venango Township, Bridge Replacement 370,000 28 (Base Construction Allocation - 29 $300,000) 30 (Land Allocation - $20,000) 19990S0504B0514 - 202 -
1 (Design and Contingencies - $50,000) 2 (11) SR 1024, SR 1024 over Britton Run, 3 Sparta Township, Bridge Replacement 340,000 4 (Base Construction Allocation - 5 $250,000) 6 (Land Allocation - $20,000) 7 (Design and Contingencies - $70,000) 8 (12) SR 2005, SR 2005 over French Creek, 9 East Fairfield Township, Bridge 10 Replacement 1,300,000 11 (Base Construction Allocation - 12 $1,130,000) 13 (Land Allocation - $20,000) 14 (Design and Contingencies - $150,000) 15 (13) SR 2010, SR 2010 over Little Sugar 16 Creek, Wayne Township, Bridge 17 Replacement 260,000 18 (Base Construction Allocation - 19 $200,000) 20 (Land Allocation - $20,000) 21 (Design and Contingencies - $40,000) 22 (14) SR 3016, SR 3016 over B&LE Railroad, 23 Summit Township, Bridge Replacement 1,150,000 24 (Base Construction Allocation - 25 $1,000,000) 26 (Land Allocation - $30,000) 27 (Design and Contingencies - $120,000) 28 (15) SR 0018, SR 0018 Bridge over 29 Tributary of Conneaut Creek, Summit 30 Township, Bridge Rehabilitation 115,000 19990S0504B0514 - 203 -
1 (Base Construction Allocation - 2 $100,000) 3 (Design and Contingencies - $15,000) 4 (16) SR 0098, SR 0098 Bridge over 5 Tributary of Cussewago Creek, Hayfield 6 Township, Bridge Rehabilitation 110,000 7 (Base Construction Allocation - 8 $100,000) 9 (Design and Contingencies - $10,000) 10 (17) SR 2003, Mercer Pike Bridge over 11 Conneaut Creek Outlet, Union Township, 12 Bridge Replacement 600,000 13 (Base Construction Allocation - 14 $520,000) 15 (Land Allocation - $30,000) 16 (Design and Contingencies - $50,000) 17 (18) SR 0006, Bridge over French Creek, 18 Woodcock Township, Bridge Painting 590,000 19 (Base Construction Allocation - 20 $500,000) 21 (Land Allocation - $10,000) 22 (Design and Contingencies - $80,000) 23 (19) SR 0408, Mohawk Run Bridge over 24 Mohawk Run, Rockdale Township, Bridge 25 Replacement 262,000 26 (Base Construction Allocation - 27 $189,000) 28 (Land Allocation - $20,000) 29 (Design and Contingencies - $53,000) 30 (20) SR 1020, Tryonville Road Bridge over 19990S0504B0514 - 204 -
1 Oil Creek, Steuben Township, Bridge 2 Replacement 960,000 3 (Base Construction Allocation - 4 $840,000) 5 (Land Allocation - $20,000) 6 (Design and Contingencies - $100,000) 7 (21) SR 1035, Brown Hill Road Bridge over 8 Muddy Creek Tributary, Rockdale 9 Township, Bridge Rehabilitation 194,000 10 (Base Construction Allocation - 11 $135,000) 12 (Land Allocation - $20,000) 13 (Design and Contingencies - $39,000) 14 (22) SR 4010, West Road Bridge over 15 Cussewago Creek, Cussewago Township, 16 Bridge Painting 480,000 17 (Base Construction Allocation - 18 $400,000) 19 (Land Allocation - $20,000) 20 (Design and Contingencies - $60,000) 21 Section 25. Cumberland County. 22 (a) Local Bridges (Reserved) 23 (b) State Bridges 24 (1) SR 1001, Cavalry Road Bridge over 25 Turnpike, North Middleton Township, 26 Bridge Replacement 2,650,000 27 (Base Construction Allocation - 28 $2,300,000) 29 (Land Allocation - $50,000) 30 (Design and Contingencies - $300,000) 19990S0504B0514 - 205 -
1 (2) SR 0015, US 15 Bridges from Zimmerman 2 Drive to PA 581, Lower Allen Township 3 and East Pennsboro Township, New Bridge 4 Construction 11,610,000 5 (Base Construction Allocation - 6 $10,422,000) 7 (Land Allocation - $100,000) 8 (Design and Contingencies - $1,088,000) 9 Section 26. Dauphin County. 10 (a) Local Bridges 11 (1) City of Harrisburg, Mulberry Street 12 Ramp to Cameron Street, Bridge 13 Rehabilitation 108,000 14 (Base Construction Allocation - 15 $73,000) 16 (Land Allocation - $10,000) 17 (Design and Contingencies - $ 25,000) 18 (2) City of Harrisburg, Maclay Street 19 Bridge over Railroad, Bridge 20 Rehabilitation 218,000 21 (Base Construction Allocation - 22 $183,000) 23 (Land Allocation - $10,000) 24 (Design and Contingencies - $25,000) 25 (3) Mifflin Township, T-631, Reitz Road 26 Bridge over Little Wiconisco Creek, 27 County Bridge No.24, Bridge 28 Replacement 290,000 29 (Base Construction Allocation - 30 $200,000) 19990S0504B0514 - 206 -
1 (Land Allocation - $10,000) 2 (Design and Contingencies - $80,000) 3 (4) Mifflin Township, T-556, Kessler Road 4 Bridge over Little Wiconisco Creek, 5 Bridge Replacement 235,000 6 (Base Construction Allocation - 7 $150,000) 8 (Land Allocation - $10,000) 9 (Design and Contingencies - $75,000) 10 (5) Washington Township, Bolts Road Bridge 11 over Wiconisco Creek, Bridge 12 Rehabilitation 469,000 13 (Base Construction Allocation - 14 $374,000) 15 (Land Allocation - $10,000) 16 (Design and Contingencies - $85,000) 17 (6) Wayne Township, T-496, Lebo Road 18 Bridge over Powell Creek, Bridge 19 Rehabilitation 263,000 20 (Base Construction Allocation - 21 $168,000) 22 (Land Allocation - $10,000) 23 (Design and Contingencies - $85,000) 24 (7) Conewago Township, T-602 and T-749 25 over Conewago Creek, Bridge 26 Replacement 722,000 27 (Base Construction Allocation - 28 $556,000) 29 (Land Allocation - $10,000) 30 (Design and Contingencies - $156,000) 19990S0504B0514 - 207 -
1 (8) Halifax Township, T-454 over Armstrong 2 Creek, Bridge Replacement 480,000 3 (Base Construction Allocation - 4 $367,000) 5 (Land Allocation - $10,000) 6 (Design and Contingencies - $103,000) 7 (9) Jackson Township, T-544 over Armstrong 8 Creek, Bridge Replacement 379,000 9 (Base Construction Allocation - 10 $288,000) 11 (Land Allocation - $10,000) 12 (Design and Contingencies - $81,000) 13 (10) Jefferson Township, T-534 over Powell 14 Creek, Bridge Replacement 397,000 15 (Base Construction Allocation - 16 $302,000) 17 (Land Allocation - $10,000) 18 (Design and Contingencies - $85,000) 19 (11) Upper Paxton Township, T-460 over 20 Wiconisco Creek, Bridge Replacement 427,000 21 (Base Construction Allocation - 22 $326,000) 23 (Land Allocation - $10,000) 24 (Design and Contingencies - $91,000) 25 (12) Washington Township, T-595 over 26 Wiconisco Creek, Bridge Replacement 669,000 27 (Base Construction Allocation - 28 $515,000) 29 (Land Allocation - $10,000) 30 (Design and Contingencies - $144,000) 19990S0504B0514 - 208 -
1 (13) Washington Township, T-462 over 2 Wiconisco Creek, Bridge Replacement 668,000 3 (Base Construction Allocation - 4 $514,000) 5 (Land Allocation - $10,000) 6 (Design and Contingencies - $144,000) 7 (14) Wayne Township, T-448 over Powell 8 Creek, Bridge Replacement 438,000 9 (Base Construction Allocation - 10 $334,000) 11 (Land Allocation - $10,000) 12 (Design and Contingencies - $94,000) 13 (15) Susquehanna Township, Interstate 14 Drive Bridge over Paxton Creek, Bridge 15 Replacement 1,118,000 16 (Base Construction Allocation - 17 $818,000) 18 (Land Allocation - $100,000) 19 (Design and Contingencies - $200,000) 20 (b) State Bridges 21 (1) SR 0039, Bridge over I-81, West 22 Hanover Township, Bridge 23 Reconstruction 3,400,000 24 (Base Construction Allocation - 25 $3,200,000) 26 (Design and Contingencies - $200,000) 27 (2) SR 0743, Spring Creek Bridge over 28 Spring Creek, Derry Township, Bridge 29 Replacement 1,760,000 30 (Base Construction Allocation - 19990S0504B0514 - 209 -
1 $1,500,000) 2 (Land Allocation - $10,000) 3 (Design and Contingencies - $250,000) 4 (3) SR 0743, Conrail Bridge over Conrail, 5 Derry Township, Bridge Replacement 1,760,000 6 (Base Construction Allocation - 7 $1,500,000) 8 (Land Allocation - $10,000) 9 (Design and Contingencies - $250,000) 10 (4) SR 3015, North Progress Avenue Bridge 11 over Paxton Creek, Susquehanna 12 Township, Bridge Rehabilitation 509,000 13 (Base Construction Allocation - 14 $409,000) 15 (Land Allocation - $20,000) 16 (Design and Contingencies - $80,000) 17 Section 27. Delaware County. 18 (a) Local Bridges 19 (1) City of Chester, West 7th Street, 20 County Bridge No.186 over Chester 21 Creek, Bridge Replacement 1,630,000 22 (Base Construction Allocation - 23 $1,470,000) 24 (Land Allocation - $10,000) 25 (Design and Contingencies - $150,000) 26 (2) Locksley Road Bridge over Chester 27 Creek, Thornbury Township, Bridge 28 Replacement 1,850,000 29 (Base Construction Allocation - 30 $1,565,000) 19990S0504B0514 - 210 -
1 (Land Allocation - $20,000) 2 (Design and Contingencies - $265,000) 3 (b) State Bridges 4 (1) SR 0030, Pedestrian Tunnel under SR 5 0030 and Ithan Avenue at Villanova 6 University, Radnor Township, Pedestrian 7 Facilities 7,360,000 8 (Base Construction Allocation - 9 $6,500,000) 10 (Land Allocation - $650,000) 11 (Design and Contingencies - $210,000) 12 (2) SR 1015, Darby-Paoli Road Bridge over 13 Branch of Little Darby Creek, Radnor 14 Township, Bridge Replacement 1,000,000 15 (Base Construction Allocation - 16 $760,000) 17 (Land Allocation - $40,000) 18 (Design and Contingencies - $200,000) 19 (3) SR 0291, 4th Street Bridge over Ridley 20 Creek, Chester Township, Bridge 21 Painting 291,000 22 (Base Construction Allocation - 23 $253,000) 24 (Design and Contingencies - $38,000) 25 (4) SR 0291, Essington Avenue Bridge over 26 Darby Creek, Ridley Township, Bridge 27 Painting 546,000 28 (Base Construction Allocation - 29 $487,000) 30 (Design and Contingencies - $59,000) 19990S0504B0514 - 211 -
1 (5) SR 1019, Conestoga Road Bridge over 2 PennDOT Railroad Right-of-Way, Radnor 3 Township, Bridge Removal 125,000 4 (Base Construction Allocation - 5 $100,000) 6 (Land Allocation - $10,000) 7 (Design and Contingencies - $15,000) 8 (6) SR 3019, Rosevally Road Bridge over 9 SEPTA, Upper Providence Township, 10 Bridge Replacement 875,000 11 (Base Construction Allocation - 12 $700,000) 13 (Land Allocation - $100,000) 14 (Design and Contingencies - $75,000) 15 (7) SR 0095, I-95 Bridge over Chester 16 Creek, City of Chester, Bridge 17 Replacement 5,100,000 18 (Base Construction Allocation - 19 $5,000,000) 20 (Design and Contingencies - $100,000) 21 (8) SR 2037, Hanser Bridge on Crum Creek 22 Road over Crum Creek, Marple Township 23 and Upper Providence Township, Bridge 24 Replacement 663,000 25 Section 28. Elk County. 26 (a) Local Bridges 27 (1) Village of Wilcox, T-631, Bridge over 28 Clarion River, Bridge Replacement 1,100,000 29 (Base Construction Allocation - 30 $850,000) 19990S0504B0514 - 212 -
1 (Land Allocation - $50,000) 2 (Design and Contingencies - $200,000) 3 (2) Jones Township, T-671, Bridge over 4 West Branch of Clarion River, Bridge 5 Replacement 1,100,000 6 (Base Construction Allocation - 7 $850,000) 8 (Land Allocation - $50,000) 9 (Design and Contingencies - $200,000) 10 (b) State Bridges 11 (1) SR 0555, Dixon Run Bridge, Village of 12 Caledonia, Jay Township, Bridge 13 Replacement 90,000 14 (Base Construction Allocation - 15 $60,000) 16 (Land Allocation - $10,000) 17 (Design and Contingencies - $20,000) 18 (2) SR 0949, Conrail Bridge over Conrail, 19 Spring Creek Township, Bridge Painting 340,000 20 (Base Construction Allocation - 21 $330,000) 22 (Design and Contingencies - $10,000) 23 (3) SR 1004, Crooked Creek Bridge over 24 Crooked Creek, Jones Township, Bridge 25 Painting 50,000 26 (Base Construction Allocation - 27 $45,000) 28 (Design and Contingencies - $5,000) 29 (4) SR 3001, Belltown Bridge over Clarion 30 River, Heath Township and Millstone 19990S0504B0514 - 213 -
1 Township, Bridge Painting 420,000 2 (Base Construction Allocation - 3 $415,000) 4 (Design and Contingencies - $5,000) 5 (5) SR 3002, Spring Creek Bridge over 6 Spring Creek, Spring Creek Township, 7 Bridge Painting 160,000 8 (Base Construction Allocation - 9 $155,000) 10 (Design and Contingencies - $5,000) 11 Section 29. Erie County. 12 (a) Local Bridges 13 (1) Girard Township, Beckman Bridge over 14 I-90, Bridge Painting 200,000 15 (Base Construction Allocation - 16 $200,000) 17 (2) Millcreek Township, T-707, Zimmerly 18 Road Bridge over I-79, New 2-Lane 19 Bridge Construction, New Bridge 2,150,000 20 (Base Construction Allocation - 21 $1,900,000) 22 (Land Allocation - $50,000) 23 (Design and Contingencies - $200,000) 24 (3) City of Erie, Norman Way, Bridge over 25 Millcreek, Bridge Rehabilitation 225,000 26 (Base Construction Allocation - 27 $200,000) 28 (Design and Contingencies - $25,000) 29 (4) City of Erie, McBride Viaduct-East 30 Avenue, Bridge over Railroad Lines, 19990S0504B0514 - 214 -
1 Bridge Rehabilitation 1,340,000 2 (Base Construction Allocation - 3 $1,300,000) 4 (Design and Contingencies - $40,000) 5 (5) City of Erie, Kahkwa Bridge over 6 Ravine Drive, Bridge Rehabilitation 60,000 7 (Base Construction Allocation - 8 $50,000) 9 (Design and Contingencies - $10,000) 10 (6) Greenfield Township, T-974, Old Route 11 89 Bridge over West Branch of French 12 Creek Tributary, Bridge Replacement 350,000 13 (Base Construction Allocation - 14 $300,000) 15 (Land Allocation - $10,000) 16 (Design and Contingencies - $40,000) 17 (7) Franklin Township, T-424, Bridge No.1 18 over Falk Run, Bridge Replacement 350,000 19 (Base Construction Allocation - 20 $300,000) 21 (Land Allocation - $10,000) 22 (Design and Contingencies - $40,000) 23 (8) Franklin Township, T-424, Bridge No.2 24 over Falk Run, Bridge Replacement 350,000 25 (Base Construction Allocation - 26 $300,000) 27 (Land Allocation - $10,000) 28 (Design and Contingencies - $40,000) 29 (9) Millcreek Township, T-707, Zimmerly 30 Road Bridge over I-79, Two-Lane Bridge 19990S0504B0514 - 215 -
1 Construction 2,150,000 2 (Base Construction Allocation - 3 $1,900,000) 4 (Land Allocation - $50,000) 5 (Design and Contingencies - $200,000) 6 (10) Waterford Township, T-455, Sedgwick 7 Road Bridge over Tributary of Lake Le 8 Boeuf, Bridge Replacement 350,000 9 (Base Construction Allocation - 10 $300,000) 11 (Land Allocation - $10,000) 12 (Design and Contingencies - $40,000) 13 (b) State Bridges 14 (1) SR 0005, SR 0005 over Scott Run, 15 Harborcreek Township, Bridge 16 Replacement 140,000 17 (Base Construction Allocation - 18 $100,000) 19 (Land Allocation - $10,000) 20 (Design and Contingencies - $30,000) 21 (2) SR 0006, SR 0006 over French Creek, Le 22 Boeuf Township, Bridge Replacement 700,000 23 (Base Construction Allocation - 24 $600,000) 25 (Land Allocation - $20,000) 26 (Design and Contingencies - $80,000) 27 (3) SR 0019, SR 0019 over LeBoeuf Creek, 28 Waterford Township, Bridge Replacement 950,000 29 (Base Construction Allocation - 30 $840,000) 19990S0504B0514 - 216 -
1 (Land Allocation - $30,000) 2 (Design and Contingencies - $80,000) 3 (4) SR 0020, SR 0020 over I-79, City of 4 Erie, Bridge Replacement 2,000,000 5 (Base Construction Allocation - 6 $1,770,000) 7 (Land Allocation - $30,000) 8 (Design and Contingencies - $200,000) 9 (5) SR 0089, SR 0089 over Sixteen Mile 10 Creek, North East Township, Bridge 11 Replacement 490,000 12 (Base Construction Allocation - 13 $400,000) 14 (Land Allocation - $20,000) 15 (Design and Contingencies - $70,000) 16 (6) SR 0090, SR 0090 over Crooked Creek, 17 Girard Township, Bridge Replacement 1,420,000 18 (Base Construction Allocation - 19 $1,330,000) 20 (Land Allocation - $30,000) 21 (Design and Contingencies - $60,000) 22 (7) SR 0090, SR 0090 under Cherry Street, 23 Summit Township, Bridge Replacement 1,600,000 24 (Base Construction Allocation - 25 $1,410,000) 26 (Land Allocation - $40,000) 27 (Design and Contingencies - $150,000) 28 (8) SR 0090, SR 0090 under Clark Road, 29 Harborcreek Township, Bridge 30 Replacement 2,100,000 19990S0504B0514 - 217 -
1 (Base Construction Allocation - 2 $1,880,000) 3 (Land Allocation - $40,000) 4 (Design and Contingencies - $180,000) 5 (9) SR 0098, SR 0098 over Cussewago Creek, 6 Elk Creek Township, Bridge Replacement 400,000 7 (Base Construction Allocation - 8 $300,000) 9 (Land Allocation - $20,000) 10 (Design and Contingencies - $80,000) 11 (10) SR 0474, SR 0474 over Dean Run, 12 Venango Township, Bridge Replacement 200,000 13 (Base Construction Allocation - 14 $160,000) 15 (Land Allocation - $10,000) 16 (Design and Contingencies - $30,000) 17 (11) SR 1001, SR 1001 over Conrail, 18 Millcreek Township, Bridge Replacement 720,000 19 (Base Construction Allocation - 20 $600,000) 21 (Land Allocation - $20,000) 22 (Design and Contingencies - $100,000) 23 (12) SR 1011, SR 1011 over Alder Brook, 24 Venango Township, Bridge Replacement 470,000 25 (Base Construction Allocation - 26 $400,000) 27 (Land Allocation - $10,000) 28 (Design and Contingencies - $60,000) 29 (13) SR 1013, SR 1013 over I-90, North 30 East Township, Bridge Replacement 1,220,000 19990S0504B0514 - 218 -
1 (Base Construction Allocation - 2 $1,100,000) 3 (Land Allocation - $20,000) 4 (Design and Contingencies - $100,000) 5 (14) SR 3001, SR 3001 over Conneaut Creek, 6 Conneaut Township, Bridge Replacement 1,020,000 7 (Base Construction Allocation - 8 $900,000) 9 (Land Allocation - $20,000) 10 (Design and Contingencies - $100,000) 11 (15) SR 3003, SR 3003 over West Branch 12 Conneaut Creek, Conneaut Township, 13 Bridge Replacement 630,000 14 (Base Construction Allocation - 15 $550,000) 16 (Land Allocation - $20,000) 17 (Design and Contingencies - $60,000) 18 (16) SR 3014, SR 3014 over Trout Run, 19 Waterford Borough, Bridge Replacement 370,000 20 (Base Construction Allocation - 21 $300,000) 22 (Land Allocation - $20,000) 23 (Design and Contingencies - $50,000) 24 (17) SR 4007, SR 4007 over I-90, Fairview 25 Township, Bridge Replacement 1,920,000 26 (Base Construction Allocation - 27 $1,800,000) 28 (Land Allocation - $20,000) 29 (Design and Contingencies - $100,000) 30 (18) SR 0020, Main Street Bridge over Elk 19990S0504B0514 - 219 -
1 Creek, Girard Township, Bridge 2 Rehabilitation 5,450,000 3 (Base Construction Allocation - 4 $5,000,000) 5 (Land Allocation - $50,000) 6 (Design and Contingencies - $400,000) 7 (19) SR 0090, I-90 Bridge, Eastbound over 8 Six Mile Creek, Harborcreek Township, 9 Bridge Rehabilitation 6,350,000 10 (Base Construction Allocation - 11 $6,000,000) 12 (Land Allocation - $50,000) 13 (Design and Contingencies - $300,000) 14 (20) SR 0090, I-90 Bridge Westbound over 15 Six Mile Creek, Harborcreek Township, 16 Bridge Rehabilitation 7,350,000 17 (Base Construction Allocation - 18 $7,000,000) 19 (Land Allocation - $50,000) 20 (Design and Contingencies - $300,000) 21 (21) SR 0090, Remington Road Bridge over 22 I-90, North East Township, Bridge 23 Replacement 500,000 24 (Base Construction Allocation - 25 $400,000) 26 (Land Allocation - $20,000) 27 (Design and Contingencies - $80,000) 28 (22) SR 0505, Bridge over Mill Creek, City 29 of Erie, Bridge Replacement 460,000 30 (Base Construction Allocation - 19990S0504B0514 - 220 -
1 $400,000) 2 (Land Allocation - $20,000) 3 (Design and Contingencies - $40,000) 4 (23) SR 0955, Bridge over Six Mile Creek, 5 Harborcreek Township, Bridge 6 Replacement 480,000 7 (Base Construction Allocation - 8 $400,000) 9 (Land Allocation - $20,000) 10 (Design and Contingencies - $60,000) 11 (24) SR 1019, Gay Road Bridge over I-90 12 Eastbound and Westbound, North East 13 Township, Bridge Replacement 2,630,000 14 (Base Construction Allocation - 15 $2,500,000) 16 (Land Allocation - $20,000) 17 (Design and Contingencies - $110,000) 18 (25) SR 3002, Cherry Hill Road Bridge over 19 Conneaut Creek, Conneaut Township, 20 Bridge Replacement 620,000 21 (Base Construction Allocation - 22 $540,000) 23 (Land Allocation - $20,000) 24 (Design and Contingencies - $60,000) 25 (26) SR 4014, Grandview Boulevard Bridge 26 over I-79 Northbound and Southbound, 27 City of Erie, Bridge Replacement 2,640,000 28 (Base Construction Allocation - 29 $2,500,000) 30 (Land Allocation - $40,000) 19990S0504B0514 - 221 -
1 (Design and Contingencies - $100,000) 2 (27) SR 4016, West 38th Street Bridge over 3 I-79 Northbound and Southbound, City of 4 Erie, Bridge Rehabilitation 1,730,000 5 (Base Construction Allocation - 6 $1,500,000) 7 (Land Allocation - $30,000) 8 (Design and Contingencies - $200,000) 9 (28) SR 2008, West High Street Bridge over 10 Horton Run, Union Township, Bridge 11 Replacement 260,000 12 (Base Construction Allocation - 13 $220,000) 14 (Land Allocation - $10,000) 15 (Design and Contingencies - $30,000) 16 Section 30. Fayette County. 17 (a) Local Bridges 18 (1) Brownsville Township, Lynn Run Road 19 Bridge over Redstone Creek, Bridge 20 Replacement 200,000 21 (Base Construction Allocation - 22 $130,000) 23 (Land Allocation - $10,000) 24 (Design and Contingencies - $60,000) 25 (2) Dunbar Township, Falls Avenue Bridge 26 over Possum Run, Bridge Replacement 450,000 27 (Base Construction Allocation - 28 $350,000) 29 (Land Allocation - $15,000) 30 (Design and Contingencies - $85,000) 19990S0504B0514 - 222 -
1 (3) Georges Township, County Bridge No.162 2 over Mountain Creek, Bridge 3 Replacement 640,000 4 (Base Construction Allocation - 5 $425,000) 6 (Land Allocation - $40,000) 7 (Design and Contingencies - $175,000) 8 (4) German Township, Footedale Bridge 9 No.66 over Dunlap Creek, Bridge 10 Replacement 498,000 11 (Base Construction Allocation - 12 $313,000) 13 (Land Allocation - $35,000) 14 (Design and Contingencies - $150,000) 15 (5) German Township, County Bridge No.54 16 over Browns Run, Bridge Replacement 793,000 17 (Base Construction Allocation - 18 $563,000) 19 (Land Allocation - $50,000) 20 (Design and Contingencies - $180,000) 21 (6) German Township, Leckrone Bridge No.54 22 over Browns Run, Bridge Replacement 430,000 23 (Base Construction Allocation - 24 $350,000) 25 (Land Allocation - $5,000) 26 (Design and Contingencies - $75,000) 27 (7) Menallen Township, T-509, Bridge over 28 Branch of Dunlap Creek, Bridge 29 Replacement 165,000 30 (Base Construction Allocation - 19990S0504B0514 - 223 -
1 $110,000) 2 (Land Allocation - $5,000) 3 (Design and Contingencies - $50,000) 4 (8) Menallen Township, Fan Hallow Road 5 Bridge over Fans Run, Bridge 6 Replacement 145,000 7 (Base Construction Allocation - 8 $90,000) 9 (Land Allocation - $5,000) 10 (Design and Contingencies - $50,000) 11 (9) Menallen and North Union Townships, 12 Fan Hollow Bridge No.184 over Jennings 13 Run, Bridge Replacement 440,000 14 (Base Construction Allocation - 15 $350,000) 16 (Land Allocation - $10,000) 17 (Design and Contingencies - $80,000) 18 (10) Nicholson Township, County Bridge 19 No.29 over York Run, Bridge 20 Replacement 535,000 21 (Base Construction Allocation - 22 $350,000) 23 (Land Allocation - $35,000) 24 (Design and Contingencies - $150,000) 25 (11) Redstone Township, Merrittstown 26 Bridge No.147 over Dunlap Creek, Bridge 27 Replacement 435,000 28 (Base Construction Allocation - 29 $350,000) 30 (Land Allocation - $10,000) 19990S0504B0514 - 224 -
1 (Design and Contingencies - $75,000) 2 (12) South Union Township, T-479, Leith 3 Bridge No.41 over Redstone Creek, 4 Bridge Replacement 690,000 5 (Base Construction Allocation - 6 $475,000) 7 (Land Allocation - $40,000) 8 (Design and Contingencies - $175,000) 9 (13) Steward Township, T-798, Meadow Run 10 Bridge No.82 over Meadow Run, Bridge 11 Replacement 825,000 12 (Base Construction Allocation - 13 $575,000) 14 (Land Allocation - $55,000) 15 (Design and Contingencies - $195,000) 16 (14) Springhill Township, T-335, County 17 Bridge No.92 over York Run, Bridge 18 Replacement 1,438,000 19 (Base Construction Allocation - 20 $1,113,000) 21 (Land Allocation - $75,000) 22 (Design and Contingencies - $250,000) 23 (15) Springfield Township, T-593, County 24 Bridge No.111 over Mill Run, Bridge 25 Replacement 320,000 26 (Base Construction Allocation - 27 $225,000) 28 (Land Allocation - $20,000) 29 (Design and Contingencies - $75,000) 30 (16) North Union Township, T-535 over 19990S0504B0514 - 225 -
1 Redstone Creek, Bridge Replacement 825,000 2 (Base Construction Allocation - 3 $625,000) 4 (Land Allocation - $25,000) 5 (Design and Contingencies - $175,000) 6 (17) North Union Township, T-557 over 7 Redstone Creek, Bridge Replacement 450,000 8 (Base Construction Allocation - 9 $275,000) 10 (Land Allocation - $50,000) 11 (Design and Contingencies - $125,000) 12 (18) Georges Township, T-387, County 13 Bridge No.102 over York Run, Bridge 14 Rehabilitation 320,000 15 (Base Construction Allocation - 16 $225,000) 17 (Land Allocation - $20,000) 18 (Design and Contingencies - $75,000) 19 (19) South Union Township, T-459, Township 20 Bridge No.1 over Lick Run, Bridge 21 Replacement 280,000 22 (Base Construction Allocation - 23 $175,000) 24 (Land Allocation - $25,000) 25 (Design and Contingencies - $80,000) 26 (20) Stewart Township, T-415, County 27 Bridge No.63 over Meadow Run, Bridge 28 Replacement 1,005,000 29 (Base Construction Allocation - 30 $775,000) 19990S0504B0514 - 226 -
1 (Land Allocation - $50,000) 2 (Design and Contingencies - $180,000) 3 (21) German Township, County Bridge No.54 4 over Browns Run at Leith Community, 5 Bridge Replacement 430,000 6 (Base Construction Allocation - 7 $350,000) 8 (Land Allocation - $5,000) 9 (Design and Contingencies - $75,000) 10 (b) State Bridges 11 (1) SR 0021, Masontown Bridge over 12 Monongahela River, Railroad and Private 13 Road, German Township, Bridge Painting 1,500,000 14 (Base Construction Allocation - 15 $1,500,000) 16 (2) SR 0031, Jacobs Creek Bridge over 17 Branch of Jacobs Creek, Bullskin 18 Township, Bridge Replacement 290,000 19 (Base Construction Allocation - 20 $180,000) 21 (Land Allocation - $35,000) 22 (Design and Contingencies - $75,000) 23 (3) SR 0119, Memorial Bridge over 24 Youghiogheny River, Connellsville 25 Borough, Bridge Painting 100,000 26 (Base Construction Allocation - 27 $100,000) 28 (4) SR 0201, Furnace Run Bridge over 29 Furnace Run, Franklin Township, Bridge 30 Replacement 445,000 19990S0504B0514 - 227 -
1 (Base Construction Allocation - 2 $245,000) 3 (Land Allocation - $25,000) 4 (Design and Contingencies - $175,000) 5 (5) SR 0711, Crawford Avenue Bridge over 6 Youghiogheny River, Connellsville 7 Borough, Bridge Painting 100,000 8 (Base Construction Allocation - 9 $100,000) 10 (6) SR 0982, Jacobs Creek Bridge over 11 Branch of Jacobs Creek, Bullskin 12 Township, Bridge Replacement 335,000 13 (Base Construction Allocation - 14 $225,000) 15 (Land Allocation - $35,000) 16 (Design and Contingencies - $75,000) 17 (7) SR 0982, Bridge over Mounts Creek, 18 Bullskin Township, Bridge Painting 105,000 19 (Base Construction Allocation - 20 $105,000) 21 (8) SR 1051, Mounts Creek Bridge over 22 Mounts Creek, Bullskin Township, Bridge 23 Replacement 436,000 24 (Base Construction Allocation - 25 $236,000) 26 (Land Allocation - $25,000) 27 (Design and Contingencies - $175,000) 28 (9) SR 3013, Browns Run Bridge over Browns 29 Run, German Township, Bridge 30 Replacement 631,000 19990S0504B0514 - 228 -
1 (Base Construction Allocation - 2 $431,000) 3 (Land Allocation - $25,000) 4 (Design and Contingencies - $175,000) 5 (10) SR 3015, Muddy Run Bridge over Muddy 6 Run, Georges Township, Bridge Painting 33,000 7 (Base Construction Allocation - 8 $33,000) 9 (11) SR 4038, Washington Run Bridge over 10 Washington Run, Perry Township, Bridge 11 Replacement 640,000 12 (Base Construction Allocation - 13 $440,000) 14 (Land Allocation - $25,000) 15 (Design and Contingencies - $175,000) 16 (12) SR 0381, SR 0381 over Stoney Run, 17 Wharton Township, Bridge Replacement 663,000 18 (Base Construction Allocation - 19 $463,000) 20 (Land Allocation - $50,000) 21 (Design and Contingencies - $150,000) 22 (13) SR 0819, SR 0819 over Branch of 23 Jacobs Creek, Lower Tyrone Township, 24 Bridge Replacement 240,000 25 (Base Construction Allocation - 26 $125,000) 27 (Land Allocation - $15,000) 28 (Design and Contingencies - $100,000) 29 (14) SR 1021, SR 1021 over Breakneck Run, 30 Bullskin Township, Bridge Replacement 650,000 19990S0504B0514 - 229 -
1 (Base Construction Allocation - 2 $475,000) 3 (Land Allocation - $50,000) 4 (Design and Contingencies - $125,000) 5 (15) SR 1031, SR 1031 over Galley Run, 6 Upper Tyrone Township, Bridge 7 Replacement 475,000 8 (Base Construction Allocation - 9 $325,000) 10 (Land Allocation - $25,000) 11 (Design and Contingencies - $125,000) 12 (16) SR 1031, SR 1031 over Branch of 13 Galley Run, Upper Tyrone Township, 14 Bridge Replacement 613,000 15 (Base Construction Allocation - 16 $413,000) 17 (Land Allocation - $50,000) 18 (Design and Contingencies - $150,000) 19 (17) SR 1044, SR 1044 over Branch of 20 Mounts Creek, Bullskin Township, Bridge 21 Replacement 350,000 22 (Base Construction Allocation - 23 $200,000) 24 (Land Allocation - $25,000) 25 (Design and Contingencies - $125,000) 26 (18) SR 2003, SR 2003 over Chaney Run, 27 Wharton Township, Bridge Replacement 290,000 28 (Base Construction Allocation - 29 $175,000) 30 (Land Allocation - $15,000) 19990S0504B0514 - 230 -
1 (Design and Contingencies - $100,000) 2 (19) SR 3003, SR 3003 at Nicholson 3 Township Border, Springhill Township, 4 Bridge Replacement 1,400,000 5 (Base Construction Allocation - 6 $1,125,000) 7 (Land Allocation - $75,000) 8 (Design and Contingencies - $200,000) 9 (20) SR 3003, SR 3003 over Georges Creek, 10 Springhill Township, Bridge 11 Replacement 1,450,000 12 (Base Construction Allocation - 13 $1,150,000) 14 (Land Allocation - $75,000) 15 (Design and Contingencies - $225,000) 16 (21) SR 3003, SR 3003 Nicholson Township 17 over Georges Creek, Springhill 18 Township, Bridge Replacement 1,200,000 19 (Base Construction Allocation - 20 $975,000) 21 (Land Allocation - $50,000) 22 (Design and Contingencies - $175,000) 23 (22) SR 3009, SR 3009 over Georges Creek, 24 Springhill Township, Bridge 25 Replacement 863,000 26 (Base Construction Allocation - 27 $688,000) 28 (Land Allocation - $25,000) 29 (Design and Contingencies - $150,000) 30 (23) SR 3013, SR 3013 over Middle Run, 19990S0504B0514 - 231 -
1 German Township, Bridge Replacement 900,000 2 (Base Construction Allocation - 3 $650,000) 4 (Land Allocation - $75,000) 5 (Design and Contingencies - $175,000) 6 (24) SR 4027, SR 4027 over Little Redstone 7 Creek, Jefferson Township, Bridge 8 Replacement 538,000 9 (Base Construction Allocation - 10 $338,000) 11 (Land Allocation - $50,000) 12 (Design and Contingencies - $150,000) 13 (25) SR 4044, SR 4044 over Downers Run, 14 Washington Township, Bridge 15 Replacement 800,000 16 (Base Construction Allocation - 17 $575,000) 18 (Land Allocation - $50,000) 19 (Design and Contingencies - $175,000) 20 (26) SR 4046, SR 4046 over Lutz Run and 21 Abandoned Railroad, Washington 22 Township, Bridge Replacement 1,400,000 23 (Base Construction Allocation - 24 $1,075,000) 25 (Land Allocation - $75,000) 26 (Design and Contingencies - $250,000) 27 (27) SR 1045, Bridge over Branch of 28 Dickerson Run, Vanderbilt Borough, 29 Bridge Replacement 330,000 30 (Base Construction Allocation - 19990S0504B0514 - 232 -
1 $225,000) 2 (Land Allocation - $5,000) 3 (Design and Contingencies - $100,000 4 (28) SR 0201, Bridge over Virgin Run, 5 Franklin Township, Bridge Replacement 330,000 6 (Base Construction Allocation - 7 $225,000) 8 (Land Allocation - $5,000) 9 (Design and Contingencies - $100,000 10 (29) SR 4016, Bridge over Redstone Creek, 11 Redstone Township, Bridge Replacement 1,030,000 12 (Base Construction Allocation - 13 $830,000) 14 (Land Allocation - $$25,000) 15 (Design and Contingencies - $175,000) 16 (30) SR 1021, Bridge over Breakneck Run, 17 Bullskin Township, Bridge Replacement 505,000 18 (Base Construction Allocation - 19 $325,000) 20 (Land Allocation - $5,000) 21 (Design and Contingencies - $175,000) 22 (31) SR 1031, Bridge over Branch of Galley 23 Run, Upper Tyrone Township, Bridge 24 Replacement 465,000 25 (Base Construction Allocation - 26 $300,000 27 (Land Allocation - $15,000) 28 (Design and Contingencies - $150,000) 29 (32) SR 3003, Bridge over Georges Creek, 30 Springhill/Nicholson Township, Bridge 19990S0504B0514 - 233 -
1 Replacement 785,000 2 (Base Construction Allocation - 3 $600,000) 4 (Land Allocation - $10,000) 5 (Design and Contingencies - $175,000) 6 (33) SR 3003, Bridge over Georges Creek, 7 Springhill/Nicholson Township, Bridge 8 Replacement 885,000 9 (Base Construction Allocation - 10 $700,000) 11 (Land Allocation - $10,000) 12 (Design and Contingencies -$175,000) 13 (34) SR 4027, Bridge over Little Redstone 14 Creek, Jefferson Township, Bridge 15 Replacement 355,000 16 (Base Construction Allocation - 17 $250,000) 18 (Land Allocation - $5,000) 19 (Design and Contingencies - $100,000) 20 (35) SR 3007, Bridge over Georges Creek, 21 Georges Township, Bridge Replacement 700,000 22 (Base Construction Allocation - 23 $500,000) 24 (Land Allocation - $25,000) 25 (Design and Contingencies - $175,000) 26 (36) SR 0031, Jacobs Creek Bridge over 27 Jacobs Creek, Bullskin Township, 28 Fayette County, and Mt. Pleasant 29 Township, Westmoreland County, Bridge 30 Replacement 715,000 19990S0504B0514 - 234 -
1 (Base Construction Allocation - 2 $500,000) 3 (Land Allocation - $40,000) 4 (Design and Contingencies - $175,000) 5 Section 31. Forest County. 6 (a) Local Bridges (Reserved) 7 (b) State Bridges 8 (1) SR 0227, SR 0227 over West Hickory 9 Creek, Harmony Township, Bridge 10 Replacement 480,000 11 (Base Construction Allocation - 12 $400,000) 13 (Land Allocation - $20,000) 14 (Design and Contingencies - $60,000) 15 (2) SR 3001, SR 3001 over Little Tionesta 16 Creek, Tionesta Township, Bridge 17 Replacement 400,000 18 (Base Construction Allocation - 19 $310,000) 20 (Land Allocation - $10,000) 21 (Design and Contingencies - $80,000) 22 (3) SR 3004, SR 3004 over Little Hickory 23 Creek, Hickory Township, Bridge 24 Replacement 390,000 25 (Base Construction Allocation - 26 $300,000) 27 (Land Allocation - $30,000) 28 (Design and Contingencies - $60,000) 29 (4) SR 3004, SR 3004 over Piney Run, Green 30 Township, Bridge Replacement 390,000 19990S0504B0514 - 235 -
1 (Base Construction Allocation - 2 $300,000) 3 (Land Allocation - $10,000) 4 (Design and Contingencies - $80,000) 5 (5) SR 3001, Red Brush Road Bridge over 6 Little Tionesta Creek, Tionesta 7 Township, Bridge Rehabilitation 605,000 8 (Base Construction Allocation - 9 $550,000) 10 (Design and Contingencies - $55,000) 11 (6) SR 1003, Bridge over Blue Jay Creek, 12 Howe Township, Bridge Rehabilitation 340,000 13 (Base Construction Allocation - 14 $250,000) 15 (Land Allocation - $30,000) 16 (Design and Contingencies - $60,000) 17 Section 32. Franklin County. 18 (a) Local Bridges (Reserved) 19 (b) State Bridges 20 (1) SR 3012, Social Island Road Bridge 21 over Conococheague Creek, Hamilton 22 Township, Bridge Replacement 786,000 23 (Base Construction Allocation - 24 $636,000) 25 (Land Allocation - $95,000) 26 (Design and Contingencies - $55,000) 27 (2) SR 4010, Edenville Road Bridge over 28 Wilson Run, St. Thomas Township, Bridge 29 Replacement 335,000 30 (Base Construction Allocation - 19990S0504B0514 - 236 -
1 $225,000) 2 (Land Allocation - $10,000) 3 (Design and Contingencies - $100,000) 4 (3) SR 4009, over Wilson Run, St. Thomas 5 Township, Bridge Replacement 750,000 6 (Base Construction Allocation - 7 $500,000) 8 (Land Allocation - $50,000) 9 (Design and Contingencies - $200,000) 10 (4) SR 4007, Tuscarora Creek Bridge over 11 Tuscarora Creek, Fannett Township, 12 Bridge Replacement 1,500,000 13 (Base Construction Allocation - 14 $1,000,000) 15 (Land Allocation - $100,000) 16 (Design and Contingencies - $400,000) 17 Section 33. Fulton County. 18 (a) Local Bridges 19 (1) Thompson Township, T-312, Bridge over 20 Licking Creek, New Bridge Construction 990,000 21 (Base Construction Allocation - 22 $800,000) 23 (Land Allocation - $15,000) 24 (Design and Contingencies - $175,000) 25 (2) Thompson Township, T-348, Bridge over 26 Licking Creek, New Bridge Construction 740,000 27 (Base Construction Allocation - 28 $575,000) 29 (Land Allocation - $25,000) 30 (Design and Contingencies - $140,000) 19990S0504B0514 - 237 -
1 (3) Thompson Township, T-325, Bridge over 2 Tonoloway Creek, New Bridge 3 Construction 800,000 4 (Base Construction Allocation - 5 $625,000) 6 (Land Allocation - $25,000) 7 (Design and Contingencies - $150,000) 8 (4) Thompson Township, T-343, Bridge over 9 Tonoloway Creek, New Bridge 10 Construction 890,000 11 (Base Construction Allocation - 12 $700,000) 13 (Land Allocation - $25,000) 14 (Design and Contingencies - $165,000) 15 (b) State Bridges 16 (1) SR 4007, Wooden Bridge over Wooden 17 Bridge Creek, Taylor Township, Bridge 18 Replacement 550,000 19 (Base Construction Allocation - 20 $405,000) 21 (Land Allocation - $25,000) 22 (Design and Contingencies - $120,000) 23 Section 34. Greene County. 24 (a) Local Bridges 25 (1) Morgan Township, County Bridge No.89 26 over Browns Run, Bridge Replacement 286,000 27 (Base Construction Allocation - 28 $166,000) 29 (Land Allocation - $20,000) 30 (Design and Contingencies - $100,000) 19990S0504B0514 - 238 -
1 (2) Morgan Township, County Bridge No.90 2 over Browns Run, Bridge Replacement 282,000 3 (Base Construction Allocation - 4 $162,000) 5 (Land Allocation - $20,000) 6 (Design and Contingencies - $100,000) 7 (3) Morgan Township, County Bridge No.91 8 over Browns Run, Bridge Replacement 273,000 9 (Base Construction Allocation - 10 $153,000) 11 (Land Allocation - $20,000) 12 (Design and Contingencies - $100,000) 13 (4) Cumberland Township, T-517, County 14 Bridge No.4, Ullery Road over Goose 15 Run, Bridge Replacement 360,000 16 (Base Construction Allocation - 17 $200,000) 18 (Land Allocation - $10,000) 19 (Design and Contingencies - $150,000) 20 (5) Cumberland Township, T-634, County 21 Bridge No.15, Coal Hill Road over Muddy 22 Creek, Bridge Replacement 410,000 23 (Base Construction Allocation - 24 $240,000) 25 (Land Allocation - $10,000) 26 (Design and Contingencies - $160,000) 27 (6) Greene Township, T-411, County Bridge 28 No.20 over Whitely Creek, Bridge 29 Replacement 1,075,000 30 (Base Construction Allocation - 19990S0504B0514 - 239 -
1 $900,000) 2 (Land Allocation - $25,000) 3 (Design and Contingencies - $150,000) 4 (7) Gray Township, T-392, County Bridge 5 No.63 over Grays Creek, Bridge 6 Replacement 380,000 7 (Base Construction Allocation - 8 $220,000) 9 (Land Allocation - $10,000) 10 (Design and Contingencies - $150,000) 11 (8) Washington Township, T-550, County 12 Bridge No.97 over Craynes Run, Bridge 13 Replacement 360,000 14 (Base Construction Allocation - 15 $200,000) 16 (Land Allocation - $10,000) 17 (Design and Contingencies - $150,000) 18 (9) Morris Township, T-629, County Bridge 19 No.73 over Bates Fork Creek, Bridge 20 Replacement 490,000 21 (Base Construction Allocation - 22 $350,000) 23 (Land Allocation - $15,000) 24 (Design and Contingencies - $125,000) 25 (10) Cumberland Township, T-660, County 26 Bridge No.13 over Muddy Creek, Bridge 27 Replacement 565,000 28 (Base Construction Allocation - 29 $400,000) 30 (Land Allocation - 15,000) 19990S0504B0514 - 240 -
1 (Design and Contingencies - $150,000) 2 (11) Aleppo Township, T-304, County Bridge 3 No.108 over Branch of Harts Run, Bridge 4 Replacement 575,000 5 (Base Construction Allocation - 6 $425,000) 7 (Land Allocation - $25,000) 8 (Design and Contingencies - $125,000) 9 (12) Franklin Township, T-511, Bridge 10 No.30 over Smith Creek, Bridge 11 Replacement 625,000 12 (Base Construction Allocation - 13 $475,000) 14 (Land Allocation - $25,000) 15 (Design and Contingencies - $125,000) 16 (13) Morgan Township, T-659, Bridge No.87 17 over Ten Mile Creek, Bridge 18 Replacement 1,275,000 19 (Base Construction Allocation - 20 $1,100,000) 21 (Land Allocation - $25,000) 22 (Design and Contingencies - $150,000) 23 (14) Richhill Township, T-356, Bridge 24 No.57 over North Fork of Wheeling 25 Creek, Bridge Replacement 765,000 26 (Base Construction Allocation - 27 $625,000) 28 (Land Allocation - $15,000) 29 (Design and Contingencies - $125,000) 30 (15) Jackson Township, T-381, Bridge 19990S0504B0514 - 241 -
1 No.109 over Job Creek, Bridge 2 Replacement 465,000 3 (Base Construction Allocation - 4 $325,000) 5 (Land Allocation - $15,000) 6 (Design and Contingencies - $125,000) 7 (b) State Bridges 8 (1) SR 0018, Bridge over South Fork of Ten 9 Mile Creek, Franklin Township, Bridge 10 Rehabilitation 320,000 11 (Base Construction Allocation - 12 $280,000) 13 (Design and Contingencies - $40,000) 14 (2) SR 0018, Bates Creek Bridge over Bates 15 Fork and Browns Creeks, Washington 16 Township, Bridge Replacement 650,000 17 (Base Construction Allocation - 18 $450,000) 19 (Land Allocation - $25,000) 20 (Design and Contingencies - $175,000) 21 (3) SR 0021, Grinnage Run Bridge over 22 Grinnage Run, Gray Township, Bridge 23 Replacement 453,000 24 (Base Construction Allocation - 25 $253,000) 26 (Land Allocation - $25,000) 27 (Design and Contingencies - $175,000) 28 (4) SR 0079, I-79 Bridge over T-631, 29 Washington Township, Bridge 30 Replacement 980,000 19990S0504B0514 - 242 -
1 (Base Construction Allocation - 2 $740,000) 3 (Land Allocation - $40,000) 4 (Design and Contingencies - $200,000) 5 (5) SR 0079, I-79 Bridge over T-631, 6 Washington Township, Bridge 7 Rehabilitation 945,000 8 (Base Construction Allocation - 9 $705,000) 10 (Land Allocation - $40,000) 11 (Design and Contingencies - $200,000) 12 (6) SR 0079, I-79 Bridge over PA 221, 13 Washington Township, Bridge 14 Replacement 2,074,000 15 (Base Construction Allocation - 16 $1,784,000) 17 (Land Allocation - $40,000) 18 (Design and Contingencies - $250,000) 19 (7) SR 0079, I-79 Bridge No.2 over PA 221, 20 Washington Township, Bridge 21 Replacement 2,074,000 22 (Base Construction Allocation - 23 $1,784,000) 24 (Land Allocation - $40,000) 25 (Design and Contingencies - $250,000) 26 (8) SR 0079, I-79 Bridge over T-512, 27 Washington Township, Bridge 28 Rehabilitation 980,000 29 (Base Construction Allocation - 30 $740,000) 19990S0504B0514 - 243 -
1 (Land Allocation - $40,000) 2 (Design and Contingencies - $200,000) 3 (9) SR 0079, I-79 Bridge No.2 over T-512, 4 Washington Township, Bridge 5 Replacement 1,020,000 6 (Base Construction Allocation - 7 $780,000) 8 (Land Allocation - $40,000) 9 (Design and Contingencies - $200,000) 10 (10) SR 0088, Albert Gallatin Bridge over 11 Monongahela River, Dunkard Township, 12 Bridge Painting 1,500,000 13 (Base Construction Allocation - 14 $1,500,000) 15 (11) SR 0088, Point Marion Bridge over 16 Monongahela River, Dunkard Township, 17 Bridge Replacement 6,200,000 18 (Base Construction Allocation - 19 $5,500,000) 20 (Land Allocation - $200,000) 21 (Design and Contingencies - $500,000) 22 (12) SR 0218, Roberts Run Bridge No.2 over 23 Roberts Run, Wayne Township, Bridge 24 Replacement 768,000 25 (Base Construction Allocation - 26 $568,000) 27 (Land Allocation - $25,000) 28 (Design and Contingencies - $175,000) 29 (13) SR 2003, Bridge over Branch of 30 Dunkard Creek, Perry Township, Bridge 19990S0504B0514 - 244 -
1 Replacement 625,000 2 (Base Construction Allocation - 3 $400,000) 4 (Land Allocation - $25,000) 5 (Design and Contingencies - $200,000) 6 (14) SR 3007, Bridge over Branch of 7 Wheeling Creek, Richill Township, 8 Bridge Replacement 375,000 9 (Base Construction Allocation - 10 $175,000) 11 (Land Allocation - $25,000) 12 (Design and Contingencies - $175,000) 13 (15) SR 3006, Dunkard Bridge over Branch 14 of Dunkard Creek, Gilmore Township, 15 Bridge Replacement 99,000 16 (Base Construction Allocation - 17 $80,000) 18 (Land Allocation - $11,000) 19 (Design and Contingencies - $8,000) 20 (16) SR 3017, Bridge over Fork of Fish 21 Creek, Freeport Township, Bridge 22 Replacement 1,500,000 23 (Base Construction Allocation - 24 $1,000,000) 25 (Land Allocation - $100,000) 26 (Design and Contingencies - $400,000) 27 Section 35. Huntingdon County. 28 (a) Local Bridges 29 (1) Mill Creek Borough, Main Street Bridge 30 over Mill Creek, Bridge Rehabilitation 30,000 19990S0504B0514 - 245 -
1 (Base Construction Allocation - 2 $30,000) 3 (2) Juniata Township, T-428, Corbin Bridge 4 over Raystown Branch of Juniata River, 5 Bridge Replacement 920,000 6 (Base Construction Allocation - 7 $920,000) 8 (3) Springfield Township, T-313, Walnut 9 Grove Bridge, County Bridge No.2 over 10 Sideling Hill Creek, Bridge 11 Replacement 975,000 12 (Base Construction Allocation - 13 $800,000) 14 (Land Allocation - $25,000) 15 (Design and Contingencies - $150,000) 16 (4) Jackson Township, T-525, Bridge over 17 Stone Creek, Bridge Rehabilitation 470,000 18 (Base Construction Allocation - 19 $350,000) 20 (Design and Contingencies - $120,000) 21 (5) Jackson Township, T-534, Bridge over 22 Greenlee Run, Bridge Rehabilitation 250,000 23 (Base Construction Allocation - 24 $170,000) 25 (Design and Contingencies - $80,000) 26 (6) Jackson Township, T-529, Bridge over 27 Stone Creek, Bridge Replacement 469,000 28 (Base Construction Allocation - 29 $355,000) 30 (Design and Contingencies - $114,000) 19990S0504B0514 - 246 -
1 (7) Jackson Township, T-534, Bridge over 2 Greenlee Run, Bridge Replacement 246,000 3 (Base Construction Allocation - 4 $169,000) 5 (Design and Contingencies - $77,000) 6 (8) Jackson Township, T-534, Eckley Road 7 Bridge over Croyle Run, Bridge 8 Replacement 255,000 9 (Base Construction Allocation - 10 $195,000) 11 (Land Allocation - $10,000) 12 (Design and Contingencies - $50,000) 13 (b) State Bridges 14 (1) SR 0522, Aughwick Bridge over Aughwick 15 Creek, East Broad Top Railroad and T- 16 396, Shirley Township, Bridge 17 Replacement 825,000 18 (Base Construction Allocation - 19 $750,000) 20 (Design and Contingencies - $75,000) 21 (2) SR 1011, Murrays Run Bridge over 22 Murrays Run, Oneida Township, Bridge 23 Replacement 615,000 24 (Base Construction Allocation - 25 $420,000) 26 (Land Allocation - $75,000) 27 (Design and Contingencies - $120,000) 28 (3) SR 2011, Narrows Creek Bridge over 29 Narrows Creek, Tell Township, Bridge 30 Replacement 785,000 19990S0504B0514 - 247 -
1 (Base Construction Allocation - 2 $590,000) 3 (Land Allocation - $50,000) 4 (Design and Contingencies - $145,000) 5 (4) SR 1005, Mill Creek Bridge over Mill 6 Creek, Brady Township, Bridge 7 Replacement 815,000 8 (Base Construction Allocation - 9 $625,000) 10 (Land Allocation - $40,000) 11 (Design and Contingencies - $150,000) 12 (5) SR 2019, Licking Creek Bridge over 13 Licking Creek, Shirley Township, Bridge 14 Replacement 505,000 15 (Base Construction Allocation - 16 $365,000) 17 (Land Allocation - $25,000) 18 (Design and Contingencies - $115,000) 19 Section 36. Indiana County. 20 (a) Local Bridges 21 (1) Banks Township, T-974, County Bridge 22 No.13, Bear Run Bridge over Bear Run, 23 Bridge Replacement 500,000 24 (Base Construction Allocation - 25 $400,000) 26 (Land Allocation - $20,000) 27 (Design and Contingencies - $80,000) 28 (2) Blacklick Township, T-574, Muddy Run 29 Bridge over Muddy Run, Bridge 30 Replacement 380,000 19990S0504B0514 - 248 -
1 (Base Construction Allocation - 2 $300,000) 3 (Land Allocation - $10,000) 4 (Design and Contingencies - $70,000) 5 (3) Cherryhill Township, T-686, County 6 Bridge No.65, Grace Church Bridge over 7 Two Lick Creek, Bridge Replacement 600,000 8 (Base Construction Allocation - 9 $500,000) 10 (Land Allocation - $20,000) 11 (Design and Contingencies - $80,000) 12 (4) Cherryhill Township, T-978, Allen 13 Bridge over Two Lick Reservoir, Bridge 14 Rehabilitation 264,000 15 (Base Construction Allocation - 16 $200,000) 17 (Land Allocation - $10,000) 18 (Design and Contingencies - $54,000) 19 (5) Rayne Township, T-760, County Bridge 20 No.23-A, Chambersville Bridge over 21 Crooked Creek, Bridge Rehabilitation 190,000 22 (Base Construction Allocation - 23 $150,000) 24 (Land Allocation - $10,000) 25 (Design and Contingencies - $30,000) 26 (6) Grant Township, T-820 over Crooked 27 Run, Bridge Replacement 245,000 28 (Base Construction Allocation - 29 $200,000) 30 (Land Allocation - $10,000) 19990S0504B0514 - 249 -
1 (Design and Contingencies - $35,000) 2 (b) State Bridges 3 (1) SR 0022, Chestnut Ridge Bridge over SR 4 0119, Burrell Township, Bridge 5 Painting 90,000 6 (Base Construction Allocation - 7 $75,000) 8 (Design and Contingencies - $15,000) 9 (2) SR 0022, Armagh Bridge over SR 0056, 10 West Wheatfield Township, Bridge 11 Painting 145,000 12 (Base Construction Allocation - 13 $130,000) 14 (Design and Contingencies - $15,000) 15 (3) SR 0119, Blacklick Bridge over 16 Blacklick Creek, Burrell Township, 17 Bridge Painting 280,000 18 (Base Construction Allocation - 19 $265,000) 20 (Design and Contingencies - $15,000) 21 (4) SR 0119, Bypass Steel Bridge No.1 over 22 Wayne Avenue Ramps, White Township, 23 Bridge Painting 170,000 24 (Base Construction Allocation - 25 $155,000) 26 (Design and Contingencies - $15,000) 27 (5) SR 0119, Bypass Steel Bridge No.2 over 28 Wayne Avenue Ramps, White Township, 29 Bridge Painting 170,000 30 (Base Construction Allocation - 19990S0504B0514 - 250 -
1 $155,000) 2 (Design and Contingencies - $15,000) 3 (6) SR 0119, Bypass Steel Bridge No.3 over 4 SR 0422, White Township, Bridge 5 Painting 240,000 6 (Base Construction Allocation - 7 $225,000) 8 (Design and Contingencies - $15,000) 9 (7) SR 0119, Bypass Steel Bridge No.4 over 10 SR 0422, White Township, Bridge 11 Painting 240,000 12 (Base Construction Allocation - 13 $225,000) 14 (Design and Contingencies - $15,000) 15 (8) SR 0119, Bypass Steel Bridge No.5 over 16 SR 0954, White Township, Bridge 17 Painting 195,000 18 (Base Construction Allocation - 19 $180,000) 20 (Design and Contingencies - $15,000) 21 (9) SR 0119, Bypass Steel Bridge No.6 over 22 SR 0954, White Township, Bridge 23 Painting 175,000 24 (Base Construction Allocation - 25 $160,000) 26 (Design and Contingencies - $15,000) 27 (10) SR 0119, Bypass Steel Bridge No.7 28 over SR 0286, White Township, Bridge 29 Painting 235,000 30 (Base Construction Allocation - 19990S0504B0514 - 251 -
1 $220,000) 2 (Design and Contingencies - $15,000) 3 (11) SR 0119, Bypass Steel Bridge No.8 4 over SR 0286, White Township, Bridge 5 Painting 215,000 6 (Base Construction Allocation - 7 $200,000) 8 (Design and Contingencies - $15,000) 9 (12) SR 0119, Bypass Steel Bridge No.9 10 over SR 1003, White Township, Bridge 11 Painting 200,000 12 (Base Construction Allocation - 13 $185,000) 14 (Design and Contingencies - $15,000) 15 (13) SR 0119, Bypass Steel Bridge No.10 16 over SR 1003, White Township, Bridge 17 Painting 175,000 18 (Base Construction Allocation - 19 $160,000) 20 (Design and Contingencies - $15,000) 21 (14) SR 0119, Bypass Steel Bridge No.11 22 over SR 0110, White Township, Bridge 23 Painting 125,000 24 (Base Construction Allocation - 25 $110,000) 26 (Design and Contingencies - $15,000) 27 (15) SR 0119, Bypass Steel Bridge No.12 28 over SR 0110, White Township, Bridge 29 Painting 125,000 30 (Base Construction Allocation - 19990S0504B0514 - 252 -
1 $110,000) 2 (Design and Contingencies - $15,000) 3 (16) SR 0217, Torrance Bridge over 4 Conemaugh River, Burrell Township, 5 Bridge Painting 435,000 6 (Base Construction Allocation - 7 $420,000) 8 (Design and Contingencies - $15,000) 9 (17) SR 0217, Blacklick Creek Bridge over 10 Blacklick Creek, Burrell Township, 11 Bridge Painting 400,000 12 (Base Construction Allocation - 13 $385,000) 14 (Design and Contingencies - $15,000) 15 (18) SR 0259, Heshbon Bridge over 16 Blacklick Creek, West Wheatfield 17 Township, Bridge Painting 200,000 18 (Base Construction Allocation - 19 $185,000) 20 (Design and Contingencies - $15,000) 21 (19) SR 0286, Clymer Bridge over Twolick 22 Creek, Clymer Borough, Bridge Painting 175,000 23 (Base Construction Allocation - 24 $160,000) 25 (Design and Contingencies - $15,000) 26 (20) SR 0422, Twolick Eastbound Bridge 27 over Twolick Creek, White Township, 28 Bridge Painting 360,000 29 (Base Construction Allocation - 30 $345,000) 19990S0504B0514 - 253 -
1 (Design and Contingencies - $15,000) 2 (21) SR 0422, Twolick Westbound Bridge 3 over Twolick Creek, White Township, 4 Bridge Painting 360,000 5 (Base Construction Allocation - 6 $345,000) 7 (Design and Contingencies - $15,000) 8 (22) SR 0422, Penn Run Exit Bridge 9 Eastbound over TR 840, White Township, 10 Bridge Painting 190,000 11 (Base Construction Allocation - 12 $175,000) 13 (Design and Contingencies - $15,000) 14 (23) SR 0422, Penn Run Exit Bridge 15 Westbound over TR 840, White Township, 16 Bridge Painting 190,000 17 (Base Construction Allocation - 18 $175,000) 19 (Design and Contingencies - $15,000) 20 (24) SR 0580, Cush Cushion Creek Bridge 21 over Cush Cushion Creek, Green 22 Township, Bridge Painting 85,000 23 (Base Construction Allocation - 24 $70,000) 25 (Design and Contingencies - $15,000) 26 (25) SR 0954, Yellow Creek Bridge over 27 Yellow Creek, White Township, Bridge 28 Painting 125,000 29 (Base Construction Allocation - 30 $110,000) 19990S0504B0514 - 254 -
1 (Design and Contingencies - $15,000) 2 (26) SR 0954, Creekside Bridge over 3 Crooked Creek, White Township, Bridge 4 Painting 125,000 5 (Base Construction Allocation - 6 $110,000) 7 (Design and Contingencies - $15,000) 8 (27) SR 0954, South Branch Bridge over 9 South Branch of Plum Creek, Washington 10 Township, Bridge Painting 75,000 11 (Base Construction Allocation - 12 $60,000) 13 (Design and Contingencies - $15,000) 14 (28) SR 1004, Philadelphia Street Exit 15 Bridge over SR 0119, White Township, 16 Bridge Painting 235,000 17 (Base Construction Allocation - 18 $220,000) 19 (Design and Contingencies - $15,000) 20 (29) SR 1006, Jimmy Stewart Airport Bridge 21 over SR 0119, White Township, Bridge 22 Painting 245,000 23 (Base Construction Allocation - 24 $230,000) 25 (Design and Contingencies - $15,000) 26 (30) SR 1007, Tanoma Bridge over Crooked 27 Creek, Rayne Township, Bridge Painting 75,000 28 (Base Construction Allocation - 29 $60,000) 30 (Design and Contingencies - $15,000) 19990S0504B0514 - 255 -
1 (31) SR 1014, Diamondville Bridge over 2 North Branch of Twolick Creek, Green 3 Township, Bridge Painting 75,000 4 (Base Construction Allocation - 5 $60,000) 6 (Design and Contingencies - $15,000) 7 (32) SR 1017, Pine Flats Bridge over South 8 Branch of Twolick Creek, Green 9 Township, Bridge Painting 95,000 10 (Base Construction Allocation - 11 $80,000) 12 (Design and Contingencies - $15,000) 13 (33) SR 1033, Gypsy Bridge over Cush 14 Creek, Montgomery Township, Bridge 15 Painting 85,000 16 (Base Construction Allocation - 17 $70,000) 18 (Design and Contingencies - $15,000) 19 (34) SR 1034, Lower Wilgus Bridge over 20 Branch of Cush Creek, Montgomery 21 Township, Bridge Painting 55,000 22 (Base Construction Allocation - 23 $40,000) 24 (Design and Contingencies - $15,000) 25 (35) SR 1038, Crooked Run Bridge over 26 Crooked Run, East Mahoning Township, 27 Bridge Painting 60,000 28 (Base Construction Allocation - 29 $45,000) 30 (Design and Contingencies - $15,000) 19990S0504B0514 - 256 -
1 (36) SR 1045, Broadhead Run Bridge over 2 Broadhead Run, Canoe Township, Bridge 3 Painting 70,000 4 (Base Construction Allocation - 5 $55,000) 6 (Design and Contingencies - $15,000) 7 (37) SR 1045, Juneau Bridge over Canoe 8 Creek, Canoe Township, Bridge Painting 75,000 9 (Base Construction Allocation - 10 $60,000) 11 (Design and Contingencies - $15,000) 12 (38) SR 1046, Straight Run Bridge over 13 Straight Run, Banks Township, Bridge 14 Painting 80,000 15 (Base Construction Allocation - 16 $65,000) 17 (Design and Contingencies - $15,000) 18 (39) SR 2019, Tearing Run Bridge No.1 over 19 Tearing Run, Center Township, Bridge 20 Painting 55,000 21 (Base Construction Allocation - 22 $40,000) 23 (Design and Contingencies - $15,000) 24 (40) SR 2019, Tearing Run Bridge No.2 over 25 Tearing Run, Center Township, Bridge 26 Painting 65,000 27 (Base Construction Allocation - 28 $50,000) 29 (Design and Contingencies - $15,000) 30 (41) SR 3003, Tunnelton Bridge over 19990S0504B0514 - 257 -
1 Conemaugh River, Conemaugh Township, 2 Bridge Painting 525,000 3 (Base Construction Allocation - 4 $510,000) 5 (Design and Contingencies - $15,000) 6 (42) SR 3007, Clarksburg Bridge over 7 Blacklegs Creek, Conemaugh Township, 8 Bridge Painting 105,000 9 (Base Construction Allocation - 10 $90,000) 11 (Design and Contingencies - $15,000) 12 (43) SR 3011, Blacklick Creek Bridge No.1 13 over Blacklick Creek, Brush Valley 14 Township, Bridge Painting 405,000 15 (Base Construction Allocation - 16 $390,000) 17 (Design and Contingencies - $15,000) 18 (44) SR 3011, Blacklick Creek Bridge No.2 19 over Blacklick Creek, Blacklick 20 Township, Bridge Painting 405,000 21 (Base Construction Allocation - 22 $390,000) 23 (Design and Contingencies - $15,000) 24 (45) SR 3013, Muddy Run Bridge over Muddy 25 Run, Blacklick Township, Bridge 26 Painting 65,000 27 (Base Construction Allocation - 28 $50,000) 29 (Design and Contingencies - $15,000) 30 (46) SR 3016, Homer City Bridge over 19990S0504B0514 - 258 -
1 Twolick Creek, Homer City Borough, 2 Bridge Painting 125,000 3 (Base Construction Allocation - 4 $110,000) 5 (Design and Contingencies - $15,000) 6 (47) SR 3031, Blacklegs Run Bridge over 7 Blacklegs Run, Young Township, Bridge 8 Painting 65,000 9 (Base Construction Allocation - 10 $50,000) 11 (Design and Contingencies - $15,000) 12 (48) SR 3037, Walker Run Bridge over 13 Walker Run, Armstrong Township, Bridge 14 Painting 55,000 15 (Base Construction Allocation - 16 $40,000) 17 (Design and Contingencies - $15,000) 18 (49) SR 3039, Anthony Run Bridge over 19 Anthony Run, Armstrong Township, Bridge 20 Painting 55,000 21 (Base Construction Allocation - 22 $40,000) 23 (Design and Contingencies - $15,000) 24 (50) SR 4001, Fisher Siding Bridge over 25 Crooked Creek, Armstrong Township, 26 Bridge Painting 110,000 27 (Base Construction Allocation - 28 $95,000) 29 (Design and Contingencies - $15,000) 30 (51) SR 4001, Five Points Bridge over 19990S0504B0514 - 259 -
1 South Branch of Plum Creek, Washington 2 Township, Bridge Painting 100,000 3 (Base Construction Allocation - 4 $85,000) 5 (Design and Contingencies - $15,000) 6 (52) SR 4006, Reddings Run Bridge over 7 Reddings Run, Washington Township, 8 Bridge Painting 55,000 9 (Base Construction Allocation - 10 $40,000) 11 (Design and Contingencies - $15,000) 12 (53) SR 4008, Kimmel Station Bridge No.1 13 over Branch of Crooked Creek, Rayne 14 Township, Bridge Painting 50,000 15 (Base Construction Allocation - 16 $35,000) 17 (Design and Contingencies - $15,000) 18 (54) SR 4008, Kimmel Station Bridge No.2 19 over Branch of Crooked Creek, Rayne 20 Township, Bridge Painting 50,000 21 (Base Construction Allocation - 22 $35,000) 23 (Design and Contingencies - $15,000) 24 (55) SR 4035, Plumville Bridge over Plum 25 Creek, Plumville Borough, Bridge 26 Painting 75,000 27 (Base Construction Allocation - 28 $60,000) 29 (Design and Contingencies - $15,000) 30 (56) SR 0056, Seward Conrail Overpass, 19990S0504B0514 - 260 -
1 East Wheatfield Township, Bridge 2 Replacement 2,570,000 3 (Base Construction Allocation - 4 $2,080,000) 5 (Land Allocation - $150,000) 6 (Design and Contingencies - $340,000) 7 (57) SR 0119, Two Lick Creek Bridge over 8 Big Two Lick Creek, Center Township, 9 Bridge Rehabilitation 1,450,000 10 (Base Construction Allocation - 11 $1,000,000) 12 (Land Allocation - $100,000) 13 (Design and Contingencies - $350,000) 14 (58) SR 0119, Bridge over PA 840, Center 15 Township, Bridge Rehabilitation 1,450,000 16 (Base Construction Allocation - 17 $1,000,000) 18 (Land Allocation - $100,000) 19 (Design and Contingencies - $350,000) 20 (59) SR 0119, Yellow Creek Bridge over 21 Yellow Creek, Center Township, Bridge 22 Rehabilitation 1,450,000 23 (Base Construction Allocation - 24 $1,000,000) 25 (Land Allocation - $100,000) 26 (Design and Contingencies - $350,000) 27 (60) SR 0119, Pickering Creek Bridge over 28 Pickering Creek, East Mahoning 29 Township, Bridge Rehabilitation 1,450,000 30 (Base Construction Allocation - 19990S0504B0514 - 261 -
1 $1,000,000) 2 (Land Allocation - $100,000) 3 (Design and Contingencies - $350,000) 4 (61) SR 0119, Northbound Bridge over PA 5 110, Rayne Township, Bridge 6 Rehabilitation 1,450,000 7 (Base Construction Allocation - 8 $1,000,000) 9 (Land Allocation - $100,000) 10 (Design and Contingencies - $350,000) 11 (62) SR 0119, Southbound Bridge over PA 12 110, Payne Township, Bridge 13 Rehabilitation 1,450,000 14 (Base Construction Allocation - 15 $1,000,000) 16 (Land Allocation - $100,000) 17 (Design and Contingencies - $350,000) 18 (63) SR 0119, Pine Run Bridge No.1 over 19 Pine Run, Rayne Township, Bridge 20 Rehabilitation 1,450,000 21 (Base Construction Allocation - 22 $1,000,000) 23 (Land Allocation - $100,000) 24 (Design and Contingencies - $350,000) 25 (64) SR 0119, Pine Run Bridge No.2 over 26 Pine Run, Rayne Township, Bridge 27 Rehabilitation 1,450,000 28 (Base Construction Allocation - 29 $1,000,000) 30 (Land Allocation - $100,000) 19990S0504B0514 - 262 -
1 (Design and Contingencies - $350,000) 2 (65) SR 0119, Northbound Bridge over US 3 422, White Township, Bridge 4 Rehabilitation 1,450,000 5 (Base Construction Allocation - 6 $1,000,000) 7 (Land Allocation - $100,000) 8 (Design and Contingencies - $350,000) 9 (66) SR 0119, Southbound Bridge over US 10 422, White Township, Bridge 11 Rehabilitation 1,450,000 12 (Base Construction Allocation - 13 $1,000,000) 14 (Land Allocation - $100,000) 15 (Design and Contingencies - $350,000) 16 (67) SR 0119, Southbound Bridge over PA 17 268, White Township, Bridge 18 Rehabilitation 1,450,000 19 (Base Construction Allocation - 20 $1,000,000) 21 (Land Allocation - $100,000) 22 (Design and Contingencies - $350,000) 23 (68) SR 0119, Northbound Bridge over SR 24 0268, White Township, Bridge 25 Rehabilitation 1,450,000 26 (Base Construction Allocation - 27 $1,000,000) 28 (Land Allocation - $100,000) 29 (Design and Contingencies - $350,000) 30 (69) SR 0119, Northbound Bridge over SR 19990S0504B0514 - 263 -
1 1002, White Township, Bridge 2 Rehabilitation 1,450,000 3 (Base Construction Allocation - 4 $1,000,000) 5 (Land Allocation - $100,000) 6 (Design & Contingencies - $350,000) 7 (70) SR 0119, Southbound Bridge over SR 8 1002, White Township, Bridge 9 Rehabilitation 1450,000 10 (Base Construction Allocation - 11 $1,000,000) 12 (Land Allocation - $100,000) 13 (Design and Contingencies - $350,000) 14 (71) SR 0119, Northbound Bridge over SR 15 1113 Ramp, White Township, Bridge 16 Rehabilitation 1,450,000 17 (Base Construction Allocation - 18 $1,000,000) 19 (Land Allocation - $100,000) 20 (Design and Contingencies - $350,000) 21 (72) SR 0119, Southbound Bridge over SR 22 1113 Ramp, White Township, Bridge 23 Rehabilitation 1,450,000 24 (Base Construction Allocation - 25 $1,000,000) 26 (Land Allocation - $100,000) 27 (Design and Contingencies - $350,000) 28 (73) SR 0286, Westbound Bridge over SR 29 1004, White Township, Bridge 30 Rehabilitation 1,050,000 19990S0504B0514 - 264 -
1 (Base Construction Allocation - 2 $750,000) 3 (Land Allocation - $50,000) 4 (Design and Contingencies - $250,000) 5 (74) SR 0422, Cheese Run Bridge over 6 Cheese Run, Armstrong Township, Bridge 7 Replacement 1,450,000 8 (Base Construction Allocation - 9 $1,000,000) 10 (Land Allocation - $100,000) 11 (Design and Contingencies - $350,000) 12 (75) SR 0422, Crooked Creek Bridge over 13 Crooked Creek, Armstrong Township, 14 Bridge Rehabilitation 1,450,000 15 (Base Construction Allocation - 16 $1,000,000) 17 (Land Allocation - $100,000) 18 (Design and Contingencies - $350,000) 19 (76) SR 0422, Crooked Creek Bridge No.2 20 over Branch Crooked Creek, Armstrong 21 Township, Bridge Rehabilitation 1,450,000 22 (Base Construction Allocation - 23 $1,000,000) 24 (Land Allocation - $100,000) 25 (Design and Contingencies - $350,000) 26 (77) SR 0422, Curry Run Bridge No.1 over 27 Curry Run, Armstrong Township, Bridge 28 Rehabilitation 1,450,000 29 (Base Construction Allocation - 30 $1,000,000) 19990S0504B0514 - 265 -
1 (Land Allocation - $100,000) 2 (Design and Contingencies - $350,000) 3 (78) SR 0422, Curry Run Bridge No.2 over 4 Curry Run, Armstrong Township, Bridge 5 Rehabilitation 1,450,000 6 (Base Construction Allocation - 7 $1,000,000) 8 (Land Allocation - $100,000) 9 (Design and Contingencies - $350,000) 10 (79) SR 0422, Curry Run Bridge No.3 over 11 Curry Run, Armstrong Township, Bridge 12 Rehabilitation 1,450,000 13 (Base Construction Allocation - 14 $1,000,000) 15 (Land Allocation - $100,000) 16 (Design and Contingencies - $350,000) 17 (80) SR 0422, Curry Run Bridge No.4 over 18 Branch of Curry Run, Armstrong 19 Township, Bridge Rehabilitation 1,450,000 20 (Base Construction Allocation - 21 $1,000,000) 22 (Land Allocation - $100,000) 23 (Design and Contingencies - $350,000) 24 (81) SR 0422, Laurel Run Bridge over 25 Laurel Run, Armstrong Township, Bridge 26 Rehabilitation 1,450,000 27 (Base Construction Allocation - 28 $1,000,000) 29 (Land Allocation - $100,000) 30 (Design and Contingencies - $350,000) 19990S0504B0514 - 266 -
1 (82) SR 0422, Westbound Bridge over PA 2 840, Cherryhill Township, Bridge 3 Rehabilitation 1,450,000 4 (Base Construction Allocation - 5 $1,000,000) 6 (Land Allocation - $100,000) 7 (Design and Contingencies - $350,000) 8 (83) SR 0422, Eastbound Bridge over PA 9 840, Cherryhill Township, Bridge 10 Rehabilitation 1,450,000 11 (Base Construction Allocation - 12 $1,000,000) 13 (Land Allocation - $100,000) 14 (Design and Contingencies - $350,000) 15 (84) SR 0422, Little Yellow Creek Bridge 16 over Little Yellow Creek, Pine 17 Township, Bridge Rehabilitation 1,450,000 18 (Base Construction Allocation - 19 $1,000,000) 20 (Land Allocation - $100,000) 21 (Design and Contingencies - $350,000) 22 (85) SR 0422, Bridge over Branch of Little 23 Yellow Creek, Pine Township, Bridge 24 Rehabilitation 1,450,000 25 (Base Construction Allocation - 26 $1,000,000) 27 (Land Allocation - $100,000) 28 (Design and Contingencies - $350,000) 29 (86) SR 0422, Westbound Bridge over PA 30 954, White Township, Bridge 19990S0504B0514 - 267 -
1 Replacement 1,450,000 2 (Base Construction Allocation - 3 $1,000,000) 4 (Land Allocation - $100,000) 5 (Design and Contingencies - $350,000) 6 (87) SR 0422, Eastbound Bridge over PA 7 954, White Township, Bridge 8 Rehabilitation 1,450,000 9 (Base Construction Allocation - 10 $1,000,000) 11 (Land Allocation - $100,000) 12 (Design and Contingencies - $350,000) 13 (88) SR 1012, Diamondville Bridge over Two 14 Lick Creek, Cherryhill Township, Bridge 15 Replacement 1,250,000 16 (Base Construction Allocation - 17 $1,000,000) 18 (Land Allocation - $50,000) 19 (Design and Contingencies - $200,000) 20 (89) SR 6422, McCarthy Run Bridge over 21 Branch of McCarthy Run, White Township, 22 Bridge Rehabilitation 1,450,000 23 (Base Construction Allocation - 24 $1,000,000) 25 (Land Allocation - $100,000) 26 (Design and Contingencies - $350,000) 27 (90) SR 6422, Bridge over Tributary of 28 McCarthy Run, White Township, Bridge 29 Rehabilitation 1,450,000 30 (Base Construction Allocation - 19990S0504B0514 - 268 -
1 $1,000,000) 2 (Land Allocation - $100,000) 3 (Design and Contingencies - $350,000) 4 Section 37. Jefferson County. 5 (a) Local Bridges 6 (1) Summerville Borough, County Bridge 40- 7 A, Anderson Road Bridge over Runaway 8 Run, Bridge Rehabilitation 415,000 9 (Base Construction Allocation - 10 $345,000) 11 (Land Allocation - $10,000) 12 (Design and Contingencies - $60,000) 13 (2) Sykesville Borough, Station Street 14 Bridge over Stump Creek, Bridge 15 Replacement 570,000 16 (Base Construction Allocation - 17 $500,000) 18 (Land Allocation - $10,000) 19 (Design and Contingencies - $60,000) 20 (3) Eldred Township, T-346 over Mill 21 Creek, Bridge Replacement 420,000 22 (Base Construction Allocation - 23 $330,000) 24 (Land Allocation - $10,000) 25 (Design and Contingencies - $80,000) 26 (4) Eldred Township, T-353 over Mill Run, 27 Bridge Replacement 245,000 28 (Base Construction Allocation - 29 $200,000) 30 (Land Allocation - $10,000) 19990S0504B0514 - 269 -
1 (Design and Contingencies - $35,000) 2 (5) Oliver Township, T-718 over Little 3 Sandy Creek, Bridge Replacement 490,000 4 (Base Construction Allocation - 5 $400,000) 6 (Land Allocation - $10,000) 7 (Design and Contingencies - $80,000) 8 (6) Union Township, T-320 over Little Mill 9 Creek, Bridge Replacement 245,000 10 (Base Construction Allocation - 11 $200,000) 12 (Land Allocation - $10,000) 13 (Design and Contingencies - $35,000) 14 (7) Union Township, T-321 over Runaway 15 Run, Bridge Replacement 145,000 16 (Base Construction Allocation - 17 $100,000) 18 (Land Allocation - $5,000) 19 (Design and Contingencies - $40,000) 20 (8) Young Township, T-632, Bridge No.JC-36 21 over Saw Mill Run, Bridge Replacement 330,000 22 (Base Construction Allocation - 23 $270,000) 24 (Design and Contingencies - $60,000) 25 (9) Oliver Township, T-380, County Bridge 26 No.22 over Hadden Run, Bridge 27 Replacement 520,000 28 (10) Henderson Township, T-519, County 29 Bridge No.7 over Big Run, Bridge 30 Replacement 595,000 19990S0504B0514 - 270 -
1 (11) Pine Creek Township, T-464, County 2 Bridge No.17 over Little Mill Creek, 3 Bridge Replacement 480,000 4 (12) Pine Creek Township, T-452, County 5 Bridge No.16 over Little Mill Creek, 6 Bridge Replacement 360,000 7 (13) Winslow Township, T-542, County 8 Bridge No.10 over Sandy Lick Creek, 9 Bridge Replacement 925,000 10 (14) Eldred Township, T-346, Mill Creek 11 Bridge over Mill Creek, Bridge 12 Replacement 420,000 13 (Base Construction Allocation - 14 $330,000) 15 (Land Allocation - $10,000) 16 (Design and Contingencies - $80,000) 17 (15) Eldred Township, T-353, Culvert over 18 Mill Creek, Bridge Replacement 195,000 19 (Base Construction Allocation - 20 $150,000) 21 (Land Allocation - $10,000) 22 (Design and Contingencies - $35,000) 23 (16) Oliver Township, T-718, Little Sandy 24 Creek Bridge over Little Sandy Creek, 25 Bridge Replacement 490,000 26 (Base Construction Allocation - 27 $400,000) 28 (Land Allocation - $10,000) 29 (Design and Contingencies - $80,000) 30 (17) Reynoldsville Borough, Point View 19990S0504B0514 - 271 -
1 Avenue Bridge over Conrail, Bridge 2 Replacement 580,000 3 (Base Construction Allocation - 4 $500,000) 5 (Land Allocation - $10,000) 6 (Design and Contingencies - $70,000) 7 (18) Union Township and Eldred Township, 8 T-342, Mill Creek Bridge over Mill 9 Creek, Bridge Replacement 490,000 10 (Base Construction Allocation - 11 $400,000) 12 (Land Allocation - $10,000) 13 (Design and Contingencies - $80,000) 14 (19) Young Township, T-632, Culvert over 15 Saw Mill Run, Bridge Replacement 310,000 16 (Base Construction Allocation - 17 $250,000) 18 (Land Allocation - $10,000) 19 (Design and Contingencies - $50,000) 20 (b) State Bridges 21 (1) SR 3033, T-830, Knox No.1 Bridge over 22 Swamp Run, Knox Township, Bridge 23 Replacement 446,000 24 (Base Construction Allocation - 25 $376,000) 26 (Land Allocation - $10,000) 27 (Design and Contingencies - $60,000) 28 (2) SR 0036, Sawmill Run Bridge over 29 Sawmill Run, Punxsutawney Borough, 30 Bridge Painting 60,000 19990S0504B0514 - 272 -
1 (Base Construction Allocation - 2 $45,000) 3 (Design and Contingencies - $15,000) 4 (3) SR 0119, Punxsutawney Bridge over 5 Mahoning Creek, Punxsutawney Borough, 6 Bridge Painting 250,000 7 (Base Construction Allocation - 8 $235,000) 9 (Design and Contingencies - $15,000) 10 (4) SR 0410, Beaver Run Bridge over Beaver 11 Run, Henderson Township, Bridge 12 Painting 55,000 13 (Base Construction Allocation - 14 $40,000) 15 (Design and Contingencies - $15,000) 16 (5) SR 0830, Falls Creek Bridge over Falls 17 Creek, Falls Creek Township, Bridge 18 Painting 80,000 19 (Base Construction Allocation - 20 $65,000) 21 (Design and Contingencies - $15,000) 22 (6) SR 0949, Corsica Exit Bridge over I- 23 80, Union Township, Bridge Painting 205,000 24 (Base Construction Allocation - 25 $190,000) 26 (Design and Contingencies - $15,000) 27 (7) SR 1009, Kyle's Run Bridge over Kyle's 28 Run, Washington Township, Bridge 29 Painting 60,000 30 (Base Construction Allocation - 19990S0504B0514 - 273 -
1 $45,000) 2 (Design and Contingencies - $15,000) 3 (8) SR 1027, Egypt Bridge over North Fork 4 Creek, Rock Township, Bridge Painting 125,000 5 (Base Construction Allocation - 6 $110,000) 7 (Design and Contingencies - $15,000) 8 (9) SR 2007, Clover Run Bridge over Clover 9 Run, Gaskill Township, Bridge Painting 95,000 10 (Base Construction Allocation - 11 $80,000) 12 (Design and Contingencies - $15,000) 13 (10) SR 2008, Stump Creek Bridge over 14 Stump Creek, Henderson Township, Bridge 15 Painting 100,000 16 (Base Construction Allocation - 17 $85,000) 18 (Design and Contingencies - $15,000) 19 (11) SR 2023, Anita Bridge over Elk Run, 20 McCalmont Township, Bridge Painting 60,000 21 (Base Construction Allocation - 22 $45,000) 23 (Design and Contingencies - $15,000) 24 (12) SR 2023, Charcoal Plant Bridge over 25 Sandy Lick Creek, Pine Creek Township, 26 Bridge Painting 125,000 27 (Base Construction Allocation - 28 $110,000) 29 (Design and Contingencies - $15,000) 30 (13) SR 3003, Baxter Bridge over Redbank 19990S0504B0514 - 274 -
1 Creek, Clover Township, Bridge 2 Painting 235,000 3 (Base Construction Allocation - 4 $220,000) 5 (Design and Contingencies - $15,000) 6 (14) SR 4006, North Fork Creek Bridge over 7 North Fork Creek, Warsaw Township, 8 Bridge Painting 110,000 9 (Base Construction Allocation - 10 $95,000) 11 (Design and Contingencies - $15,000) 12 (15) SR 0310, Bridge over Branch of Trout 13 Run, Winslow Township, Bridge 14 Replacement 490,000 15 (Base Construction Allocation - 16 $350,000) 17 (Land Allocation - $20,000) 18 (Design and Contingencies - $120,000) 19 (16) SR 3018, Bridge over Little Sandy 20 Creek, Limestone Township, Bridge 21 Replacement 670,000 22 (Base Construction Allocation - 23 $500,000) 24 (Land Allocation - $20,000) 25 (Design and Contingencies - $150,000) 26 (17) SR 0028, Knapp Run Bridge over Knapp 27 Run, Clover Township, Bridge 28 Rehabilitation 1,450,000 29 (Base Construction Allocation - 30 $1,000,000) 19990S0504B0514 - 275 -
1 (Land Allocation - $100,000) 2 (Design and Contingencies - $350,000) 3 (18) SR 0028, Coder Run Bridge over Coder 4 Run, Rose Township, Bridge 5 Rehabilitation 1,450,000 6 (Base Construction Allocation - 7 $1,000,000) 8 (Land Allocation - $100,000) 9 (Design and Contingencies - $350,000) 10 (19) SR 0028, Mill Creek Bridge over Mill 11 Creek, Snyder Township, Bridge 12 Rehabilitation 1,050,000 13 (Base Construction Allocation - 14 $750,000) 15 (Land Allocation - $50,000) 16 (Design and Contingencies - $250,000) 17 (20) SR 0028, Redbank Creek Bridge over 18 Tributary of Redbank Creek, Summerville 19 Borough, Bridge Rehabilitation 1,450,000 20 (Base Construction Allocation - 21 $1,000,000) 22 (Land Allocation - $100,000) 23 (Design and Contingencies - $350,000) 24 (21) SR 0028, Seneca Run Bridge over 25 Seneca Run, Warsaw Township, Bridge 26 Rehabilitation 1,050,000 27 (Base Construction Allocation - 28 $750,000) 29 (Land Allocation - $50,000) 30 (Design and Contingencies - $250,000) 19990S0504B0514 - 276 -
1 (22) SR 0080, I-80 Bridge Westbound over 2 PA 36, Brookville Borough, Bridge 3 Rehabilitation 1,450,000 4 (Base Construction Allocation - 5 $1,000,000) 6 (Land Allocation - $100,000) 7 (Design and Contingencies - $350,000) 8 (23) SR 0080, I-80 Bridge Eastbound over 9 PA 36, Brookville Borough, Bridge 10 Rehabilitation 1,450,000 11 (Base Construction Allocation - 12 $1,000,000) 13 (Land Allocation - $100,000) 14 (Design and Contingencies - $350,000) 15 (24) SR 0080, I-80 Bridge over PA 28, Pine 16 Creek Township, Bridge Rehabilitation 1,450,000 17 (Base Construction Allocation - 18 $1,000,000) 19 (Land Allocation - $100,000) 20 (Design and Contingencies - $350,000) 21 (25) SR 0080, I-80 Bridge over Little Mill 22 Creek, Pine Creek Township, Bridge 23 Rehabilitation 1,450,000 24 (Base Construction Allocation - 25 $1,000,000) 26 (Land Allocation - $100,000) 27 (Design and Contingencies - $350,000) 28 (26) SR 0080, I-80 Bridge over Mill Creek, 29 Pine Creek Township, Bridge 30 Rehabilitation 1,450,000 19990S0504B0514 - 277 -
1 (Base Construction Allocation - 2 $1,000,000) 3 (Land Allocation - $100,000) 4 (Design and Contingencies - $350,000) 5 (27) SR 0119, Rock Run Bridge over Rock 6 Run, Bell Township, Bridge 7 Rehabilitation 1,450,000 8 (Base Construction Allocation - 9 $1,000,000) 10 (Land Allocation - $100,000) 11 (Design and Contingencies - $350,000) 12 (28) SR 0119, Stump Creek Bridge over 13 Branch of Stump Creek, Henderson 14 Township, Bridge Rehabilitation 1,450,000 15 (Base Construction Allocation - 16 $1,000,000) 17 (Land Allocation - $100,000) 18 (Design and Contingencies - $350,000) 19 (29) SR 0119, Punxsutawney Bridge over 20 Mahoning Creek, Punxsutawney Borough, 21 Bridge Replacement 2,400,000 22 (Base Construction Allocation - 23 $2,000,000) 24 (Land Allocation - $50,000) 25 (Design and Contingencies - $350,000) 26 (30) SR 0119, Rock Run Bridge over Rock 27 Run, Sykesville Borough, Bridge 28 Rehabilitation 1,450,000 29 (Base Construction Allocation - 30 $1,000,000) 19990S0504B0514 - 278 -
1 (Land Allocation - $100,000) 2 (Design and Contingencies - $350,000) 3 (31) SR 0119, Sugar Camp Run Bridge over 4 Sugar Camp Run, Sykesville Borough, 5 Bridge Rehabilitation 1,450,000 6 (Base Construction Allocation - 7 $1,000,000) 8 (Land Allocation - $100,000) 9 (Design and Contingencies - $350,000) 10 (32) SR 3003, Baxter Bridge over Red Bank 11 Creek, Clover Township, Bridge 12 Rehabilitation 350,000 13 (Base Construction Allocation - 14 $320,000) 15 (Design and Contingencies - $30,000) 16 (33) SR 3005, Worthville Bridge over 17 Little Sandy Creek, Beaver Township, 18 Bridge Painting 115,000 19 (Base Construction Allocation - 20 $100,000) 21 (Design and Contingencies - $15,000) 22 (34) SR 3007, Summerville Borough Bridge 23 over Red Bank Creek, Summerville 24 Borough, Bridge Replacement 1,730,000 25 (Base Construction Allocation - 26 $1,500,000) 27 (Land Allocation - $80,000) 28 (Design and Contingencies - $150,000) 29 (35) SR 3008, Perryville Run Bridge over 30 Perryville Run, Perry Township, Bridge 19990S0504B0514 - 279 -
1 Painting 65,000 2 (Base Construction Allocation - 3 $50,000) 4 (Design and Contingencies - $15,000) 5 (36) SR 3008, Horatio Bridge over Branch 6 of Mahoning Creek, Perry Township, 7 Bridge Painting 55,000 8 (Base Construction Allocation - 9 $40,000) 10 (Design and Contingencies - $15,000) 11 (37) SR 3013, Valier Truss Bridge over 12 Mahoning Creek, Perry Township, Bridge 13 Painting 700,000 14 (Base Construction Allocation - 15 $600,000) 16 (Design and Contingencies - $100,000) 17 (38) SR 3014, Sprankle Mills Bridge over 18 Big Run, Oliver Township, Bridge 19 Painting 100,000 20 (Base Construction Allocation - 21 $85,000) 22 (Design and Contingencies - $15,000) 23 (39) SR 3014, Worthville Bridge over 24 Little Sandy Creek, Perry Township, 25 Bridge Painting 105,000 26 (Base Construction Allocation - 27 $90,000) 28 (Design and Contingencies - $15,000) 29 (40) SR 3018, Coolspring Bridge over 30 Little Sandy Creek, Oliver Township, 19990S0504B0514 - 280 -
1 Bridge Replacement 670,000 2 (Base Construction Allocation - 3 $500,000) 4 (Land Allocation - $20,000) 5 (Design and Contingencies - $150,000) 6 (41) SR 3033, Fivemile Run Bridge over 7 Fivemile Run, Brookville Borough, 8 Bridge Replacement 595,000 9 (Base Construction Allocation - 10 $400,000) 11 (Land Allocation - $20,000) 12 (Design and Contingencies - $175,000) 13 (42) SR 3039, Brookville Bridge No.2 over 14 Fivemile Run, Brookville Borough, 15 Bridge Replacement 590,000 16 (Base Construction Allocation - 17 $500,000) 18 (Land Allocation - $30,000) 19 (Design and Contingencies - $60,000) 20 (43) SR 4005, Richardsville Bridge over 21 North Fork Creek, Warsaw Township, 22 Bridge Replacement 490,000 23 (Base Construction Allocation - 24 $400,000) 25 (Land Allocation - $30,000) 26 (Design and Contingencies - $60,000) 27 (44) SR 4005, Perkin Run Bridge over 28 Perkin Run, Warsaw Township, Bridge 29 Painting 65,000 30 (Base Construction Allocation - 19990S0504B0514 - 281 -
1 $50,000) 2 (Design and Contingencies - $15,000) 3 (45) SR 4005, Richardsville Bridge over 4 North Fork Creek, Warsaw Township, 5 Bridge Painting 90,000 6 (Base Construction Allocation - 7 $75,000) 8 (Design and Contingencies - $15,000) 9 Section 38. Juniata County. 10 (a) Local Bridges 11 (1) Fayette Township, T-558 over West 12 Branch of Cocolamus Creek, Bridge 13 Rehabilitation 21,000 14 (Base Construction Allocation - 15 $18,000) 16 (Design and Contingencies - $3,000) 17 (2) Fayette Township, T-602 over Little 18 Lost Creek, Bridge Rehabilitation 19,000 19 (Base Construction Allocation - 20 $17,000) 21 (Design and Contingencies - $2,000) 22 (3) Delaware Township, T-471, Delaware 23 Creek Bridge, Bridge Replacement 210,000 24 (Base Construction Allocation - 25 $150,000) 26 (Land Allocation - $10,000) 27 (Design and Contingencies - $50,000) 28 (4) Fermanagh Township, T-410, Lost Creek 29 Bridge, Bridge Replacement 640,000 30 (Base Construction Allocation - 19990S0504B0514 - 282 -
1 $510,000) 2 (Land Allocation - $10,000) 3 (Design and Contingencies - $120,000) 4 (5) Milford Township, T-360, Licking Creek 5 Bridge over Licking Creek, Bridge 6 Rehabilitation 350,000 7 (Base Construction Allocation - 8 $260,000) 9 (Land Allocation - $10,000) 10 (Design and Contingencies - $80,000) 11 (6) Susquehanna Township, T-315, Mahatango 12 Bridge over Mahatango Creek, Bridge 13 Replacement 370,000 14 (Base Construction Allocation - 15 $280,000) 16 (Land Allocation - $10,000) 17 (Design and Contingencies - $80,000) 18 (7) Tuscarora Township, Spectacle Gap 19 Bridge over Spectacle Gap Run, Bridge 20 Replacement 80,000 21 (Base Construction Allocation - 22 $73,000) 23 (Design and Contingencies - $7,000) 24 (8) Tuscarora Township, T-309, Tuscarora 25 Creek Bridge, Bridge Replacement 1,200,000 26 (Base Construction Allocation - 27 $930,000) 28 (Land Allocation - $20,000) 29 (Design and Contingencies - $250,000) 30 (9) Tuscarora Township, T-387, Willow Run 19990S0504B0514 - 283 -
1 Bridge, Bridge Replacement 370,000 2 (Base Construction Allocation - 3 $260,000) 4 (Land Allocation - $10,000) 5 (Design and Contingencies - $100,000) 6 (b) State Bridges 7 (1) SR 0850, Laurel Run Bridge over Laurel 8 Run, Village of Honey Grove, Tuscarora 9 Township, Bridge Replacement 670,000 10 (Base Construction Allocation - 11 $500,000) 12 (Land Allocation - $20,000) 13 (Design and Contingencies - $150,000) 14 (2) SR 0850, Bridge over Tuscarora Creek, 15 Tuscarora Township, Bridge 16 Rehabilitation 155,000 17 (Base Construction Allocation - 18 $150,000) 19 (Design and Contingencies - $5,000) 20 (3) SR 0850, Bridge over Tuscarora Creek, 21 Tuscarora Township, Bridge Replacement 1,420,000 22 (Base Construction Allocation - 23 $1,280,000) 24 (Land Allocation - $40,000) 25 (Design and Contingencies - $100,000) 26 (4) SR 0035, Lost Creek Bridge over Lost 27 Creek, Fayette Township, Bridge 28 Replacement 795,000 29 (Base Construction Allocation - 30 $600,000) 19990S0504B0514 - 284 -
1 (Land Allocation - $10,000) 2 (Design and Contingencies - $185,000) 3 (5) SR 0035, Juniata River Bridge over 4 Juniata River, Mifflintown Borough, 5 Bridge Replacement 4,700,000 6 (Base Construction Allocation - 7 $4,000,000) 8 (Land Allocation - $200,000) 9 (Design and Contingencies - $500,000) 10 (6) SR 0075, Bridge over US 22, Walker 11 Township, Bridge Painting 810,000 12 (Base Construction Allocation - 13 $800,000) 14 (Design & Contingencies - $10,000) 15 (7) SR 0333, Delaware Creek Bridge, 16 Thompsontown Borough, Bridge 17 Replacement 560,000 18 (Base Construction Allocation - 19 $400,000) 20 (Land Allocation - $10,000) 21 (Design and Contingencies - $150,000) 22 (8) SR 1002, Lost Creek Bridge over Lost 23 Creek, Fermanagh Township, Bridge 24 Replacement 920,000 25 (Base Construction Allocation - 26 $730,000) 27 (Land Allocation - $10,000) 28 (Design and Contingencies - $180,000) 29 (9) SR 1004, Little Lost Creek Bridge over 30 Little Lost Creek, Fayette Township, 19990S0504B0514 - 285 -
1 Bridge Replacement 260,000 2 (Base Construction Allocation - 3 $150,000) 4 (Land Allocation - $10,000) 5 (Design and Contingencies - $100,000) 6 (10) SR 2010, Stoney Run Bridge over 7 Tributary of Stoney Run, Monroe 8 Township, Bridge Replacement 290,000 9 (Base Construction Allocation - 10 $180,000) 11 (Land Allocation - $30,000) 12 (Design and Contingencies - $80,000) 13 (11) SR 3025, Tuscarora Creek Bridge over 14 Tuscarora Creek, Lack Township, Bridge 15 Replacement 560,000 16 (Base Construction Allocation - 17 $500,000) 18 (Land Allocation - $10,000) 19 (Design and Contingencies - $50,000) 20 Section 39. Lackawanna County. 21 (a) Local Bridges 22 (1) Mayfield Borough, Poplar Street Bridge 23 No.1 at Junction of South Washington 24 Avenue, Bridge Rehabilitation 150,000 25 (Base Construction Allocation - 26 $130,000) 27 (Design and Contingencies - $20,000) 28 (2) Benton Township, T-474 and T-470, 29 Seamans Bridge, Bridge Rehabilitation 800,000 30 (3) South Abington Township, Leach Street 19990S0504B0514 - 286 -
1 Bridge, Bridge Replacement 500,000 2 (b) State Bridges 3 (1) SR 1016, Hill Street Bridge over 4 Lackawanna River, Jessup and Blakely 5 Boroughs, Bridge Deck Rehabilitation 890,000 6 (Base Construction Allocation - 7 $800,000) 8 (Land Allocation - $10,000) 9 (Design and Contingencies - $80,000) 10 (2) SR 3011, Keyser Avenue Bridge over 11 Lindy Creek, City of Scranton, Bridge 12 Replacement 185,000 13 (Base Construction Allocation - 14 $100,000) 15 (Land Allocation - $10,000) 16 (Design and Contingencies - $75,000) 17 (3) SR 0171, Bridge over Elk Creek at 18 Junction of SR 1011, Fell Township, 19 Bridge Replacement 660,000 20 (Base Construction Allocation - 21 $520,000) 22 (Land Allocation - $10,000) 23 (Design and Contingencies - $130,000) 24 (4) SR 0247, Bridge over South Branch of 25 Tunkhannock Creek, North of TR 438, 26 Scott Township, Bridge Replacement 426,000 27 (Base Construction Allocation - 28 $330,000) 29 (Land Allocation - $10,000) 30 (Design and Contingencies - $86,000) 19990S0504B0514 - 287 -
1 (5) SR 2003, Bridge over Wallenpaupack 2 Creek, North of TR 348, Jefferson 3 Township, Bridge Replacement 355,000 4 (Base Construction Allocation - 5 $275,000) 6 (Land Allocation - $10,000) 7 (Design and Contingencies - $70,000) 8 (6) SR 3013, Main Street Bridge, Old Forge 9 Borough, Bridge Painting 660,000 10 (Base Construction Allocation - 11 $600,000) 12 (Design and Contingencies - $60,000) 13 (7) State Bridges, Countywide Bridge Zone 14 Painting, Bridge Painting 370,000 15 (Base Construction Allocation - 16 $350,000) 17 (Land Allocation - $10,000) 18 (Design and Contingencies - $10,000) 19 (8) SR 1013, Bridge over Elm Brook, 0.7 20 Mile North of SR 1006, Scott Township, 21 Bridge Replacement 240,000 22 (Base Construction Allocation - 23 $200,000) 24 (Land Allocation - $10,000) 25 (Design and Contingencies - $30,000) 26 (9) SR 0524, Kennedy Creek Bridge, 0.5 27 Mile East of TR 407, North Abington 28 Township, Bridge Replacement 330,000 29 (Base Construction Allocation - 30 $280,000) 19990S0504B0514 - 288 -
1 (Land Allocation - $10,000) 2 (Design and Contingencies - $40,000) 3 (10) SR 0011, Roaring Brook Retaining 4 Wall, Spruce Street Complex, City of 5 Scranton, Bridge Replacement 1,320,000 6 (Base Construction Allocation - 7 $1,160,000) 8 (Land Allocation - $10,000) 9 (Design and Contingencies - $150,000) 10 (11) SR 3020, Linden Street Bridge over 11 Lackawanna River, City of Scranton, 12 Bridge Rehabilitation 480,000 13 (Base Construction Allocation - 14 $380,000) 15 (Design and Contingencies - $100,000) 16 (12) SR 4007, Ackerly Creek Bridge over 17 Ackerly Creek, Abington Township, 18 Bridge Replacement 363,000 19 (Base Construction Allocation - 20 $264,000) 21 (Land Allocation - $11,000) 22 (Design and Contingencies - $88,000) 23 Section 40. Lancaster County. 24 (a) Local Bridges 25 (1) Manor Township, T-599, West Roseville 26 Road Bridge over Little Conestoga 27 Creek, Bridge Replacement 375,000 28 (Base Construction Allocation - 29 $286,000) 30 (Land Allocation - $10,000) 19990S0504B0514 - 289 -
1 (Design and Contingencies - $150,000) 2 (2) Mt. Joy Township, T-350, Risser Mill 3 Bridge over Tributary of Little 4 Chickies Creek, Bridge Rehabilitation 550,000 5 (Base Construction Allocation - 6 $400,000) 7 (Design and Contingencies - $150,000) 8 (3) Pequea Township, Silver Mine Road at 9 Burnt Mills, Bridge Replacement 100,000 10 (Base Construction Allocation - 11 $90,000) 12 (Design and Contingencies - $10,000) 13 (4) East Hempfield and Manheim Townships, 14 Shreiner Station Road Bridge over 15 Conestoga Creek, Bridge Replacement 477,000 16 (Base Construction Allocation - 17 $377,000) 18 (Land Allocation - $20,000) 19 (Design and Contingencies - $80,000) 20 (5) City of Lancaster, Liberty Avenue 21 Bridge over Conrail, New Bridge 22 Construction 5,000,000 23 (Base Construction Allocation - 24 $4,400,000) 25 (Land Allocation - $100,000) 26 (Design and Contingencies - $500,000) 27 (b) State Bridges 28 (1) SR 1024, Bridge over Little Cocalico 29 Creek, East Cocalico Township, Bridge 30 Replacement 675,000 19990S0504B0514 - 290 -
1 (Base Construction Allocation - 2 $550,000) 3 (Land Allocation - $25,000) 4 (Design and Contingencies - $100,000) 5 Section 41. Lawrence County. 6 (a) Local Bridges 7 (1) City of New Castle, Willard Avenue 8 Bridge over Tributary of Shenango 9 River, Bridge Replacement 210,000 10 (Base Construction Allocation - 11 $150,000) 12 (Land Allocation - $20,000) 13 (Design and Contingencies - $40,000) 14 (2) Wampum Borough, Main Street Bridge 15 over Eckles Run, Bridge Rehabilitation 190,000 16 (Base Construction Allocation - 17 $150,000) 18 (Design and Contingencies - $40,000) 19 (b) State Bridges 20 (1) SR 0018, Mahoning Avenue Viaduct over 21 Shenango River and Railroad, City of 22 New Castle, Bridge Replacement 9,320,000 23 (Base Construction Allocation - 24 $9,000,000) 25 (Land Allocation - $20,000) 26 (Design and Contingencies - $300,000) 27 (2) SR 0018, Liberty Street Bridge over 28 Hickory Run, New Castle City, Bridge 29 Rehabilitation 450,000 30 (Base Construction Allocation - 19990S0504B0514 - 291 -
1 $300,000) 2 (Land Allocation - $50,000) 3 (Design and Contingencies - $100,000) 4 (3) SR 0060, SR 0060 Southbound over SR 5 4004, Neshannock Township, Bridge 6 Replacement 350,000 7 (Base Construction Allocation - 8 $200,000) 9 (Land Allocation - $50,000) 10 (Design and Contingencies - $100,000) 11 (4) SR 0065, Ellwood Road Bridge over B & 12 O Railroad, Shenango Township, Bridge 13 Replacement 400,000 14 (Base Construction Allocation - 15 $250,000) 16 (Land Allocation - $50,000) 17 (Design and Contingencies - $100,000) 18 (5) SR 0488, Portersville Road Bridge over 19 Morrison Run, Perry Township, Bridge 20 Replacement 250,000 21 (Base Construction Allocation - 22 $100,000) 23 (Land Allocation - $50,000) 24 (Design and Contingencies - $100,000) 25 (6) SR 0488, Portersville Road Bridge over 26 Morrison Run, Perry Township, Bridge 27 Replacement 250,000 28 (Base Construction Allocation - 29 $100,000) 30 (Land Allocation - $50,000) 19990S0504B0514 - 292 -
1 (Design and Contingencies - $100,000) 2 (7) SR 3001, South Main Street Bridge over 3 Bessemer Haul Road, Bessemer Borough, 4 Bridge Rehabilitation 950,000 5 (Base Construction Allocation - 6 $800,000) 7 (Design and Contingencies - $150,000) 8 (8) SR 4004, Union and Neshannock 9 Townships, Bridge Rehabilitation 800,000 10 (Base Construction Allocation - 11 $700,000) 12 (Design and Contingencies - $100,000) 13 (9) SR 0060, Beaver Valley Expansion 14 Bridge over SR 4005, Neshannock 15 Township, Bridge Rehabilitation 650,000 16 (Base Construction Allocation - 17 $500,000) 18 (Design and Contingencies - $150,000) 19 (10) SR 0060, Beaver Valley Extension 20 Bridge over SR 4005, Neshannock 21 Township, Bridge Rehabilitation 127,000 22 (Base Construction Allocation - 23 $116,000) 24 (Design and Contingencies - $11,000) 25 (11) SR 0081, US 224 State Street Bridge 26 over SR 0422 and Ramp K, Union 27 Township, Bridge Rehabilitation 706,000 28 (Base Construction Allocation - 29 $644,000) 30 (Design and Contingencies - $62,000) 19990S0504B0514 - 293 -
1 (12) SR 0422, Westbound Bridge over Beaver 2 River, Railroad and Local Street, 3 Taylor Township, Bridge Rehabilitation 6,841,000 4 (Base Construction Allocation - 5 $6,741,000) 6 (Design and Contingencies - $100,000) 7 (13) SR 0422, Eastbound Bridge over Beaver 8 River, Railroad and Local Street, 9 Taylor Township, Bridge Replacement 6,963,000 10 (Base Construction Allocation - 11 $6,863,000) 12 (Design and Contingencies - $100,000) 13 (14) SR 0422, Bridge over Business US 422, 14 Union Township, Bridge Rehabilitation 1,379,000 15 (Base Construction Allocation - 16 $1,254,000) 17 (Design and Contingencies - $125,000) 18 (15) SR 0422, Ben Franklin Highway Bridge 19 over Business US 422, Union Township, 20 Bridge Rehabilitation 436,000 21 (Base Construction Allocation - 22 $398,000) 23 (Design and Contingencies - $38,000) 24 (16) SR 0551, Main Street Bridge over 25 Beaver Creek, Little Beaver Township, 26 Bridge Replacement 624,000 27 (Base Construction Allocation - 28 $524,000) 29 (Design and Contingencies - $100,000) 30 (17) SR 2020, Pleasant Road Bridge over 19990S0504B0514 - 294 -
1 Camp Run, Perry Township, Bridge 2 Replacement 400,000 3 (Base Construction Allocation - 4 $300,000) 5 (Design and Contingencies - $100,000) 6 (18) SR 3002, Beaver Dam Road Bridge over 7 Honey Creek, Little Beaver Township, 8 Bridge Painting 30,000 9 (Base Construction Allocation - 10 $25,000) 11 (Design and Contingencies - $5,000) 12 (19) SR 3004, Wallace Road Bridge over 13 Sugar Creek, North Beaver Township, 14 Bridge Replacement 130,000 15 (Base Construction Allocation - 16 $120,000) 17 (Design and Contingencies - $10,000) 18 (20) SR 3004, Wallace Road Bridge over 19 Branch of Honey Creek, North Beaver 20 Township, Bridge Painting 30,000 21 (Base Construction Allocation - 22 $25,000) 23 (Design and Contingencies - $5,000) 24 (21) SR 3004, Wallace Road Bridge over 25 Branch of Honey Creek, North Beaver 26 Township, Bridge Painting 325,000 27 (Base Construction Allocation - 28 $300,000) 29 (Design and Contingencies - $25,000) 30 (22) SR 4006, Coffee Run Bridge over 19990S0504B0514 - 295 -
1 Coffee Run, Mahoning Township, Bridge 2 Replacement 335,000 3 (Base Construction Allocation - 4 $270,000) 5 (Land Allocation - $15,000) 6 (Design and Contingencies - $50,000) 7 (23) SR 0224, Bridge over Conrail, 8 Mahoning Township, Bridge Replacement 2,000,000 9 (Base Construction Allocation - 10 $1,700,000) 11 (Land Allocation - $100,000) 12 (Design and Contingencies - $200,000) 13 (24) SR 2003, Wurtemburg Road Bridge over 14 Branch of Duck Run, Mahoning Township, 15 Bridge Replacement 135,000 16 (Base Construction Allocation - 17 $100,000) 18 (Land Allocation - $20,000) 19 (Design and Contingencies - $15,000) 20 (25) SR 0168, Moravia Street Bridge over 21 US 422, Taylor Township, Bridge 22 Rehabilitation 761,000 23 (Base Construction Allocation - 24 $662,000) 25 (Design and Contingencies - $99,000) 26 (26) SR 0288, Main Street Bridge over 27 Tributary of Beaver River, Wayne 28 Township, Bridge Replacement 296,000 29 (Base Construction Allocation - 30 $240,000) 19990S0504B0514 - 296 -
1 (Land Allocation - $20,000) 2 (Design and Contingencies - $36,000) 3 (27) SR 1001, High Street Bridge over 4 Little Neshannock Creek, New Wilmington 5 Borough, Bridge Replacement 89,000 6 (Base Construction Allocation - 7 $60,000) 8 (Land Allocation - $20,000) 9 (Design and Contingencies - $9,000) 10 (28) SR 2007, Armstrong Road Bridge over 11 Branch of Slippery Rock Creek, Perry 12 Township, Bridge Replacement 420,000 13 (Base Construction Allocation - 14 $300,000) 15 (Land Allocation - $20,000) 16 (Design and Contingencies - $100,000) 17 (29) SR 3004, Honey Creek Bridge No.1 over 18 Branch of Honey Creek, North Beaver 19 Township, Bridge Rehabilitation 25,000 20 (Base Construction Allocation - 21 $20,000) 22 (Design and Contingencies - $5,000) 23 (30) SR 3004, Honey Creek Bridge No.2 over 24 Branch of Honey Creek, North Beaver 25 Township, Bridge Painting 25,000 26 (Base Construction Allocation - 27 $20,000) 28 (Design and Contingencies - $5,000) 29 (31) SR 3004, Honey Creek Bridge No.3 over 30 Branch of Honey Creek, North Beaver 19990S0504B0514 - 297 -
1 Township, Bridge Painting 25,000 2 (Base Construction Allocation - 3 $20,000) 4 (Design and Contingencies - $5,000) 5 (32) SR 4001, Villa Maria Road Bridge over 6 Tributary of Coffee Run, Mahoning 7 Township, Bridge Replacement 234,000 8 (Base Construction Allocation - 9 $186,000) 10 (Land Allocation - $20,000) 11 (Design and Contingencies - $28,000) 12 Section 42. Lebanon County. 13 (a) Local Bridges 14 (1) Union Township, T-617, Green Point 15 School House Bridge over Trout Run, 16 Bridge Replacement 255,000 17 (Base Construction Allocation - 18 $170,000) 19 (Land Allocation - $10,000) 20 (Design and Contingencies - $75,000) 21 (2) Bethel Township, Market Drive, T-545 22 over Beach Run, Bridge Replacement 30,000 23 (Base Construction Allocation - 24 $20,000) 25 (Design and Contingencies - $10,000) 26 (3) South Londonderry Township, Patrick 27 Road, T-331 over Tributary of Little 28 Conewago Creek, Bridge Rehabilitation 5,000 29 (Base Construction Allocation - $4,000) 30 (Design and Contingencies - $1,000) 19990S0504B0514 - 298 -
1 (4) South Londonderry Township, Eckert 2 Road, T-304 over Little Conewago Creek, 3 Bridge Rehabilitation 5,000 4 (Base Construction Allocation - $4,000) 5 (Design and Contingencies - $1,000) 6 (5) South Londonderry Township, Risser 7 Road, T-300 over Conewago Creek, Bridge 8 Rehabilitation 4,000 9 (Base Construction Allocation - $3,000) 10 (Design and Contingencies - $1,000) 11 (6) South Londonderry Township, Long Road, 12 T-304 over Tributary of Conewago Creek, 13 Bridge Rehabilitation 4,000 14 (Base Construction Allocation - $3,000) 15 (Design and Contingencies - $1,000) 16 (7) South Londonderry Township, Eckert 17 Road, T-304 over Tributary of Little 18 Conewago Creek, Bridge Rehabilitation 5,000 19 (Base Construction Allocation - $4,000) 20 (Design and Contingencies - $1,000) 21 (8) South Londonderry Township, Church 22 Road, T-303 over Unnamed Creek, Bridge 23 Rehabilitation 3,000 24 (Base Construction Allocation - $2,000) 25 (Design and Contingencies - $1,000) 26 (9) South Londonderry Township, Patrick 27 Road, T-331 over Tributary of Little 28 Conewago Creek, Bridge Rehabilitation 4,000 29 (Base Construction Allocation - $3,000) 30 (Design and Contingencies - $1,000) 19990S0504B0514 - 299 -
1 (10) South Londonderry Township, Hinkle 2 Road, T-433 over Killinger Creek, 3 Bridge Rehabilitation 4,000 4 (Base Construction Allocation - $3,000) 5 (Design and Contingencies - $1,000) 6 (11) South Londonderry Township, Brandt 7 Road, T-346 over Killinger Creek, 8 Bridge Rehabilitation 3,000 9 (Base Construction Allocation - $2,000) 10 (Design and Contingencies - $1,000) 11 (12) Union Township, Green Point School 12 House Road, T-617 over Trout Run, 13 Bridge Replacement 90,000 14 (Base Construction Allocation - 15 $70,000) 16 (Design and Contingencies - $20,000) 17 (13) South Lebanon Township, Wilhelm 18 Overpass, Reconstruct as Pedestrian 19 Bridge 150,000 20 (Base Construction Allocation - 21 $125,000) 22 (Design and Contingencies - $25,000) 23 (b) State Bridges (Reserved) 24 Section 43. Lehigh County. 25 (a) Local Bridges 26 (1) Coplay and Northampton Boroughs, 27 Chestnut Street Bridge over Lehigh 28 River, Bridge Rehabilitation 2,000,000 29 (Base Construction Allocation - 30 $1,900,000) 19990S0504B0514 - 300 -
1 (Design and Contingencies - $100,000) 2 (2) Hokendauqua and North Catasauqua 3 Boroughs, Lehigh Street Bridge over 4 Lehigh River, Bridge Replacement 8,750,000 5 (Base Construction Allocation - 6 $8,500,000) 7 (Design and Contingencies - $250,000) 8 (b) State Bridges 9 (1) SR 4007, Schlicher's Bridge over 10 Jordan Creek, North Whitehall Township, 11 Bridge Replacement 875,000 12 (Base Construction Allocation - 13 $560,000) 14 (Land Allocation - $145,000) 15 (Design and Contingencies - $170,000) 16 (2) SR 3011, Farmington Road over 17 Tributary of Schaffer Run, Upper 18 Macungie Township, Bridge 19 Rehabilitation 330,000 20 (Base Construction Allocation - 21 $175,000) 22 (Land Allocation - $55,000) 23 (Design and Contingencies - $100,000) 24 (3) SR 1027, Cold Springs Road over Spring 25 Creek, Whitehall Township, Bridge 26 Replacement 2,550,000 27 (Base Construction Allocation - 28 $1,640,000) 29 (Land Allocation - $420,000) 30 (Design and Contingencies - $490,000) 19990S0504B0514 - 301 -
1 Section 44. Luzerne County. 2 (a) Local Bridges 3 (1) Ashley Borough, Ashley Street Bridge, 4 Bridge Removal 260,000 5 (Base Construction Allocation - 6 $200,000) 7 (Land Allocation - $5,000) 8 (Design and Contingencies - $55,000) 9 (2) Franklin Township, T-784, Bridge over 10 Sutton Creek, Bridge Replacement 320,000 11 (Base Construction Allocation - 12 $250,000) 13 (Land Allocation - $15,000) 14 (Design and Contingencies - $55,000) 15 (3) Black Creek Township, T-309 over Falls 16 Run Creek, Bridge Replacement 395,000 17 (Base Construction Allocation - 18 $265,000) 19 (Land Allocation - $5,000) 20 (Design and Contingencies - $125,000) 21 (4) Black Creek Township, T-314 over 22 Branch of Black Creek, Bridge 23 Replacement 440,000 24 (Base Construction Allocation - 25 $310,000) 26 (Land Allocation - $5,000) 27 (Design and Contingencies - $125,000) 28 (5) Butler Township, T-356 over Nescopeck 29 Creek, Bridge Replacement 405,000 30 (Base Construction Allocation - 19990S0504B0514 - 302 -
1 $275,000) 2 (Land Allocation - $5,000) 3 (Design and Contingencies - $125,000) 4 (6) City of Wilkes-Barre, Division Street 5 over Solomon's Creek, Bridge 6 Replacement 955,000 7 (Base Construction Allocation - 8 $800,000) 9 (Land Allocation - $5,000) 10 (Design and Contingencies - $150,000) 11 (7) Dallas Township, County Road No.12 12 over Toby's Creek, Bridge Replacement 405,000 13 (Base Construction Allocation - 14 $275,000) 15 (Land Allocation - $5,000) 16 (Design and Contingencies - $125,000) 17 (8) Dennison Township, County Road No.41 18 over Nescopeck Creek, Bridge 19 Replacement 405,000 20 (Base Construction Allocation - 21 $275,000) 22 (Land Allocation - $5,000) 23 (Design and Contingencies - $125,000) 24 (9) Dorrance Township, County Road No.30 25 over Wapwallopen Creek, Bridge 26 Replacement 405,000 27 (Base Construction Allocation - 28 $275,000) 29 (Land Allocation - $5,000) 30 (Design and Contingencies - $125,000) 19990S0504B0514 - 303 -
1 (10) Fairmount Township, T-563 over Maple 2 Run Creek, Bridge Replacement 395,000 3 (Base Construction Allocation - 4 $265,000) 5 (Land Allocation - $5,000) 6 (Design and Contingencies - $125,000) 7 (11) Franklin Township, T-782 over Sutton 8 Creek, Bridge Replacement 405,000 9 (Base Construction Allocation - 10 $275,000) 11 (Land Allocation - $5,000) 12 (Design and Contingencies - $125,000) 13 (12) Hunlock Township, T-534 over Hunlock 14 Creek, Bridge Replacement 405,000 15 (Base Construction Allocation - 16 $275,000) 17 (Land Allocation - $5,000) 18 (Design and Contingencies - $125,000) 19 (13) Jackson Township, County Road No.16 20 over Toby's Creek, Bridge Replacement 350,000 21 (Base Construction Allocation - 22 $225,000) 23 (Land Allocation - $5,000) 24 (Design and Contingencies - $120,000) 25 (14) Jackson Township, County Road No.16 26 over Toby's Creek, Bridge Replacement 370,000 27 (Base Construction Allocation - 28 $240,000) 29 (Land Allocation - $5,000) 30 (Design and Contingencies - $125,000) 19990S0504B0514 - 304 -
1 (15) Jackson Township, T-605 over Branch 2 of Harvey's Creek, Bridge Replacement 395,000 3 (Base Construction Allocation - 4 $265,000) 5 (Land Allocation - $5,000) 6 (Design and Contingencies - $125,000) 7 (16) Jackson Township, County Road No.13 8 over Toby's Creek, Bridge Replacement 395,000 9 (Base Construction Allocation - 10 $265,000) 11 (Land Allocation - $5,000) 12 (Design and Contingencies - $125,000) 13 (17) Lake Township, T-796 over Beaver Run 14 Creek, Bridge Replacement 410,000 15 (Base Construction Allocation - 16 $280,000) 17 (Land Allocation - $5,000) 18 (Design and Contingencies - $125,000) 19 (18) Lake Township, T-779 over Bryant Pond 20 Outlet, Bridge Replacement 430,000 21 (Base Construction Allocation - 22 $300,000) 23 (Land Allocation - $5,000) 24 (Design and Contingencies - $125,000) 25 (19) Nescopeck Township, T-381 over Branch 26 of Nescopeck Creek, Bridge Replacement 410,000 27 (Base Construction Allocation - 28 $280,000) 29 (Land Allocation - $5,000) 30 (Design and Contingencies - $125,000) 19990S0504B0514 - 305 -
1 (20) Ross Township, T-680 over Huntingdon 2 Creek, Bridge Replacement 410,000 3 (Base Construction Allocation - 4 $280,000) 5 (Land Allocation - $5,000) 6 (Design and Contingencies - $125,000) 7 (21) Ross Township, T-571 over Outlet 8 North Pond, Bridge Replacement 420,000 9 (Base Construction Allocation - 10 $290,000) 11 (Land Allocation - $5,000) 12 (Design and Contingencies - $125,000) 13 (22) Ross Township, T-575 over Huntingdon 14 Creek, Bridge Replacement 455,000 15 (Base Construction Allocation - 16 $325,000) 17 (Land Allocation - $5,000) 18 (Design and Contingencies - $125,000) 19 (23) Ross Township, County Road No.2 over 20 Marsh Creek, Bridge Replacement 440,000 21 (Base Construction Allocation - 22 $310,000) 23 (Land Allocation - $5,000) 24 (Design and Contingencies - $125,000) 25 (24) Sugarloaf Township, T-332 over Branch 26 of Nescopeck Creek, Bridge Replacement 430,000 27 (Base Construction Allocation - 28 $300,000) 29 (Land Allocation - $5,000) 30 (Design and Contingencies - $125,000) 19990S0504B0514 - 306 -
1 (25) Plymouth Township, T-497 over Mud 2 Pond Inlet, Bridge Replacement 405,000 3 (Base Construction Allocation - 4 $275,000) 5 (26) Slocum Township, T-454 over Black 6 Creek, Bridge Replacement 395,000 7 (Base Construction Allocation - 8 $265,000) 9 (Land Allocation - $5,000) 10 (Design and Contingencies - $125,000) 11 (27) Wright Township, County Road No.21 12 over Wapwallopen Creek, Bridge 13 Replacement 395,000 14 (Base Construction Allocation - 15 $265,000) 16 (Land Allocation - $5,000) 17 (Design and Contingencies - $125,000) 18 (28) City of Wilkes-Barre, Stanton Street, 19 Bowman Spring Run Bridge, Intersection 20 of Empire Street, Bridge Replacement 170,000 21 (Base Construction Allocation - 22 $140,000) 23 (Land Allocation - $10,000) 24 (Design and Contingencies - $20,000) 25 (29) Borough of Larksville, Nesbitt Street 26 Bridge, Bridge Replacement 109,000 27 (Base Construction Allocation - 28 $95,000) 29 (Design and Contingencies - $14,000) 30 (b) State Bridges 19990S0504B0514 - 307 -
1 (1) SR 0011, Erie-Lackawanna Railroad 2 Bridge over Erie-Lackawanna Railroad, 3 Plymouth Township, Bridge Removal 185,000 4 (Base Construction Allocation - 5 $150,000) 6 (Land Allocation - $10,000) 7 (Design and Contingencies - $25,000) 8 (2) SR 1030, Harvey's Lake Bridge at 9 Junction of SR 1053, Lake Township, 10 Bridge Replacement 460,000 11 (Base Construction Allocation - 12 $350,000) 13 (Land Allocation - $20,000) 14 (Design and Contingencies - $90,000) 15 (3) SR 3007, Bridge over Wapwallopen 16 Creek, South of SR 3010, Dorrance 17 Township, Bridge Replacement 530,000 18 (Base Construction Allocation - 19 $420,000) 20 (Land Allocation - $10,000) 21 (Design and Contingencies - $100,000) 22 (4) State Bridges, Countywide Bridge Zone 23 Painting, Bridge Painting 370,000 24 (Base Construction Allocation - 25 $350,000) 26 (Land Allocation - $10,000) 27 (Design and Contingencies - $10,000) 28 (5) SR 3038, Black Creek Stone Arch 29 Bridge, 0.1 Mile North of SR 3018, 30 Black Creek Township, Bridge 19990S0504B0514 - 308 -
1 Replacement 240,000 2 (Base Construction Allocation - 3 $200,000) 4 (Land Allocation - $10,000) 5 (Design and Contingencies - $30,000) 6 (6) SR 1034, Pikes Creek Bridge, 132 Feet 7 East of TR 11, Lake Township, Bridge 8 Replacement 180,000 9 (Base Construction Allocation - 10 $150,000) 11 (Land Allocation - $10,000) 12 (Design and Contingencies - $20,000) 13 (7) SR 2041, Wright Creek Bridge, 2 Miles 14 North of TR 940, Dennison Township, 15 Bridge Replacement 400,000 16 (Base Construction Allocation - 17 $340,000) 18 (Land Allocation - $10,000) 19 (Design and Contingencies - $50,000) 20 (8) SR 0309, Toby's Creek Bridge over 21 Toby's Creek, Kingston Township, Bridge 22 Replacement 1,276,000 23 (Base Construction Allocation - 24 $1,100,000) 25 (Land Allocation - $11,000) 26 (Design and Contingencies - $165,000) 27 (9) SR 0309, North Cross Valley Dams over 28 Susquehanna River, Plains Township, 29 Bridge Rehabilitation 1,517,000 30 (Base Construction Allocation - 19990S0504B0514 - 309 -
1 $1,377,000) 2 (Design and Contingencies - $140,000) 3 (10) SR 0415, Harveys Lake Inlet Bridge 4 No.2 over Harveys Lake Inlet, Harveys 5 Lake Borough, Bridge Replacement 345,000 6 (Base Construction Allocation - 7 $260,000) 8 (Land Allocation - $10,000) 9 (Design and Contingencies - $75,000) 10 Section 45. Lycoming County. 11 (a) Local Bridges 12 (1) Mifflin Township, T-651 over Larry's 13 Creek, Bridge Replacement 528,000 14 (Base Construction Allocation - 15 $438,000) 16 (Land Allocation - $20,000) 17 (Design and Contingencies - $70,000) 18 (2) McIntyre Township, T-667, Rolston 19 Bridge over Lycoming Creek, Bridge 20 Replacement 1,620,000 21 (Base Construction Allocation - 22 $1,400,000) 23 (Land Allocation - $20,000) 24 (Design and Contingencies - $200,000) 25 (3) Franklin Township, T-710, Bridge over 26 Beaver Run, Bridge Replacement 265,000 27 (Base Construction Allocation - 28 $212,000) 29 (Land Allocation - $40,000) 30 (Design and Contingencies - $13,000) 19990S0504B0514 - 310 -
1 (4) Piatt Township, T-365, Bridge over 2 Larry's Creek, Bridge Replacement 1,251,000 3 (Base Construction Allocation - 4 $1,039,000) 5 (Land Allocation - $30,000) 6 (Design and Contingencies - $182,000) 7 (5) McIntyre Township, T-673, Bridge over 8 Lycoming Creek, Bridge Replacement 902,000 9 (Base Construction Allocation - 10 $744,000) 11 (Land Allocation - $23,000) 12 (Design and Contingencies - $135,000) 13 (6) Shrewsbury Township, T-686, Bridge 14 over Rock Run, Bridge Replacement 288,000 15 (Base Construction Allocation - 16 $238,000) 17 (Land Allocation - $7,000) 18 (Design and Contingencies - $43,000) 19 (7) Piatt Township, T-343, Bridge over 20 Pine Run, Bridge Replacement 353,000 21 (Base Construction Allocation - 22 $291,000) 23 (Land Allocation - $9,000) 24 (Design and Contingencies - $53,000) 25 (8) Washington Township, T-397, Bridge 26 over Deer Hole Creek, Bridge 27 Replacement 517,000 28 (Base Construction Allocation - 29 $426,000) 30 (Land Allocation - $13,000) 19990S0504B0514 - 311 -
1 (Design and Contingencies - $78,000) 2 (9) South Williamsport Borough, East 3 Central Avenue, Bridge over Hagermans 4 Run, Bridge Replacement 519,000 5 (Base Construction Allocation - 6 $428,000) 7 (Land Allocation - $13,000) 8 (Design and Contingencies - $78,000) 9 (10) Moreland Township, T-443, Bridge over 10 Little Muncy Creek, Bridge Replacement 780,000 11 (Base Construction Allocation - 12 $630,000) 13 (Land Allocation - $20,000) 14 (Design and Contingencies - $130,000) 15 (11) Muncy Creek Township, T-437, Bridge 16 over Branch of Muncy Creek, Bridge 17 Replacement 335,000 18 (Base Construction Allocation - 19 $268,000) 20 (Land Allocation - $17,000) 21 (Design and Contingencies - $50,000) 22 (12) Muncy Creek Township, T-811, Bridge 23 over Wolf Run, Bridge Replacement 150,000 24 (Base Construction Allocation - 25 $120,000) 26 (Land Allocation - $10,000) 27 (Design and Contingencies - $20,000) 28 (13) Pine Township, T-782, Lycoming County 29 Bridge No.109 over Texas Creek, Bridge 30 Replacement 537,000 19990S0504B0514 - 312 -
1 (Base Construction Allocation - 2 $426,000) 3 (Land Allocation - $6,000) 4 (Design and Contingencies - $105,000) 5 (b) State Bridges 6 (1) SR 0220, Quenshukeny Run Bridge over 7 Quenshukeny Run, Village of Linden, 8 Bridge Replacement 395,000 9 (Base Construction Allocation - 10 $316,000) 11 (Land Allocation - $20,000) 12 (Design and Contingencies - $59,000) 13 (2) SR 0973, Bridge over Hoagland Run, 3 14 Miles West of Cogan Station, Bridge 15 Rehabilitation 195,000 16 (Base Construction Allocation - 17 $156,000) 18 (Land Allocation - $10,000) 19 (Design and Contingencies - $29,000) 20 (3) SR 1006, Wallis Run Bridge over Wallis 21 Run, Cascade Township, Bridge 22 Replacement 65,000 23 (Base Construction Allocation - 24 $50,000) 25 (Land Allocation - $5,000) 26 (Design and Contingencies - $10,000) 27 (4) SR 2022, Mill Creek Bridge, North of 28 Montoursville, Bridge Replacement 668,000 29 (Base Construction Allocation - 30 $575,000) 19990S0504B0514 - 313 -
1 (Land Allocation - $43,000) 2 (Design and Contingencies - $50,000) 3 (5) SR 2051, Wolf Run Bridge over Wolf 4 Run, South of SR 0220, Muncy Township, 5 Bridge Replacement 638,000 6 (Base Construction Allocation - 7 $510,000) 8 (Land Allocation - $32,000) 9 (Design and Contingencies - $96,000) 10 (6) SR 3024, Jobs Run Road Bridge over 11 Tributary of Larrys Creek, East of 12 Salladasburg, Bridge Replacement 108,000 13 (Base Construction Allocation - 14 $92,000) 15 (Land Allocation - $8,000) 16 (Design and Contingencies - $8,000) 17 (7) SR 3028, West 4th Street, Lycoming 18 Creek Bridge, City of Williamsport, 19 Bridge Rehabilitation 216,000 20 (Base Construction Allocation - 21 $185,000) 22 (Land Allocation - $15,000) 23 (Design and Contingencies - $16,000) 24 (8) SR 0044, Bridge over Conrail, Bridge 25 Painting 210,000 26 (Base Construction Allocation - 27 $200,000) 28 (Design and Contingencies - $10,000) 29 (9) SR 0180, I-180 Eastbound Bridge over 30 Loyalsock Creek, Bridge Painting 135,000 19990S0504B0514 - 314 -
1 (Base Construction Allocation - 2 $125,000) 3 (Design and Contingencies - $10,000) 4 (10) SR 0180, I-180 Westbound Bridge over 5 Loyalsock Creek, Bridge Painting 135,000 6 (Base Construction Allocation - 7 $125,000) 8 (Design and Contingencies - $10,000) 9 (11) SR 2014, Bridge over Lycoming Creek, 10 Bridge Painting 780,000 11 (Base Construction Allocation - 12 $770,000) 13 (Design and Contingencies - $10,000) 14 (12) SR 2061, Bridge over Little Muncy 15 Creek, Bridge Painting 80,000 16 (Base Construction Allocation - 17 $70,000) 18 (Design and Contingencies - $10,000) 19 (13) SR 0014, SR 0014 over Trout Run, 20 Lewis Township, Bridge Replacement 640,000 21 (Base Construction Allocation - 22 $512,000) 23 (Land Allocation - $32,000) 24 (Design and Contingencies - $96,000) 25 (14) SR 0044, SR 0044 over Ramsey Run, 26 Cummings Township, Bridge Replacement 394,000 27 (Base Construction Allocation - 28 $315,000) 29 (Land Allocation - $20,000) 30 (Design and Contingencies - $59,000) 19990S0504B0514 - 315 -
1 (15) SR 0044, SR 0044 over Pine Bottom 2 Run, Cummings Township, Bridge 3 Replacement 360,000 4 (Base Construction Allocation - 5 $288,000) 6 (Land Allocation - $18,000) 7 (Design and Contingencies - $54,000) 8 (16) SR 0118, SR 0118 over Big Run, 9 Franklin Township, Bridge Replacement 382,000 10 (Base Construction Allocation - 11 $307,000) 12 (Land Allocation - $19,000) 13 (Design and Contingencies - $56,000) 14 (17) SR 0284, SR 0284 over Blacks Creek, 15 Pine Township, Bridge Replacement 700,000 16 (Base Construction Allocation - 17 $570,000) 18 (Land Allocation - $30,000) 19 (Design and Contingencies - $100,000) 20 (18) SR 0405, SR 0405 over West Branch of 21 Susquehanna River, Muncy Creek 22 Township, Bridge Replacement 24,924,000 23 (Base Construction Allocation - 24 $19,939,000) 25 (Land Allocation - $1,246,000) 26 (Design and Contingencies - $3,739,000) 27 (19) SR 0654, SR 0654 over Mosquito Creek, 28 Anthony Township, Bridge Replacement 674,000 29 (Base Construction Allocation - 30 $539,000) 19990S0504B0514 - 316 -
1 (Land Allocation - $34,000) 2 (Design and Contingencies - $101,000) 3 (20) SR 0973, SR 0973 over Mud Run, 4 Mifflin Township, Bridge Replacement 294,000 5 (Base Construction Allocation - 6 $252,000) 7 (Land Allocation - $20,000) 8 (Design and Contingencies - $22,000) 9 (21) SR 1005, SR 1005 over Plunketts 10 Creek, Plunketts Creek Township, Bridge 11 Replacement 366,000 12 (Base Construction Allocation - 13 $293,000) 14 (Land Allocation - $18,000) 15 (Design and Contingencies - $55,000) 16 (22) SR 2061, SR 2061 over Sugar Run, 17 Moreland Township, Bridge Replacement 443,000 18 (Base Construction Allocation - 19 $354,000) 20 (Land Allocation - $22,000) 21 (Design and Contingencies - $67,000) 22 (23) SR 2085, SR 2085 over Muncy Creek, 23 Penn Township, Bridge Replacement 1,050,000 24 (Base Construction Allocation - 25 $840,000) 26 (Land Allocation - $53,000) 27 (Design and Contingencies - $157,000) 28 (24) SR 0405, East Water Street over Glade 29 Run, Muncy Borough, Bridge Replacement 500,000 30 (Base Construction Allocation - 19990S0504B0514 - 317 -
1 $350,000) 2 (Land Allocation - $50,000) 3 (Design and Contingencies - $100,000) 4 (25) SR 1003, Bridge over Wallis Run, 5 Gamble Township, Bridge Replacement 1,020,000 6 (Base Construction Allocation - 7 $820,000) 8 (Land Allocation - $50,000) 9 (Design and Contingencies - $150,000) 10 (26) SR 1003, Bridge over Salt Run, Gamble 11 Township, Bridge Replacement 390,000 12 (Base Construction Allocation - 13 $300,000) 14 (Land Allocation - $30,000) 15 (Design and Contingencies - $60,000) 16 (27) US 15, Bridge over 2nd Avenue, South 17 Williamsport Borough, Bridge 18 Replacement 1,550,000 19 (Base Construction Allocation - 20 $1,250,000) 21 (Land Allocation - $50,000) 22 (Design and Contingencies - $250,000) 23 (28) SR 44, Bridge over Conrail, Nippenose 24 Township, Bridge Replacement 2,425,000 25 (Base Construction Allocation - 26 $2,000,000) 27 (Land Allocation - $100,000) 28 (Design and Contingencies - $325,000) 29 (29) US 220, Southbound Bridge over SR 30 3005, Jersey Shore Borough, Deck 19990S0504B0514 - 318 -
1 Replacement 275,000 2 (Base Construction Allocation - 3 $225,000) 4 (Design and Contingencies - $50,000) 5 (30) US 220, Northbound Bridge over 6 Railroad, Porter Township, Bridge 7 Replacement 900,000 8 (Base Construction Allocation - 9 $750,000) 10 (Design and Contingencies - $150,000) 11 (31) US 220, Southbound Bridge over 12 Railroad, Porter Township, Bridge 13 Rehabilitation 900,000 14 (Base Construction Allocation - 15 $750,000) 16 (Design and Contingencies - $150,000) 17 (32) US 220, Northbound Bridge over SR 18 3005, Jersey Shore Borough, Bridge 19 Rehabilitation 275,000 20 (Base Construction Allocation - 21 $225,000) 22 (Design and Contingencies - $50,000) 23 (33) US 220, Ramp on US 220, Jersey Shore 24 Borough, Deck Replacement 1,500,000 25 (Base Construction Allocation - 26 $1,250,000) 27 (Design and Contingencies - $250,000) 28 (34) US 220, Northbound Bridge over Ramp 29 A, Woodward Township, Bridge 30 Rehabilitation 550,000 19990S0504B0514 - 319 -
1 (Base Construction Allocation - 2 $500,000) 3 (Design and Contingencies - $50,000) 4 (35) US 220, Northbound Bridge over T-331, 5 Woodward Township, Bridge 6 Rehabilitation 275,000 7 (Base Construction Allocation - 8 $250,000) 9 (Design and Contingencies - $25,000) 10 (36) US 220, Northbound Bridge over 11 Railroad, Woodward Township, Bridge 12 Rehabilitation 825,000 13 (Base Construction Allocation - 14 $750,000) 15 (Design and Contingencies - $75,000) 16 (37) US 220, Southbound Bridge over Ramp, 17 Woodward Township, Bridge 18 Rehabilitation 550,000 19 (Base Construction Allocation - 20 $500,000) 21 (Design and Contingencies - $50,000) 22 (38) US 220, Southbound Bridge over T-331, 23 Woodward Township, Bridge 24 Rehabilitation 275,000 25 (Base Construction Allocation - 26 $250,000) 27 (Design and Contingencies - $25,000) 28 (39) US 220, Southbound Bridge over 29 Railroad, Woodward Township, Bridge 30 Rehabilitation 825,000 19990S0504B0514 - 320 -
1 (Base Construction Allocation - 2 $750,000) 3 (Design and Contingencies - $75,000) 4 (40) US 220, Reach Road over US 220, City 5 of Williamsport, Deck Replacement 1,400,000 6 (Base Construction Allocation - 7 $1,250,000) 8 (Design and Contingencies - $150,000) 9 (41) US 220, Northbound Bridge over Arch 10 Street, City of Williamsport, Bridge 11 Rehabilitation 385,000 12 (Base Construction Allocation - 13 $350,000) 14 (Design and Contingencies - $35,000) 15 (42) US 220, Southbound Bridge over Arch 16 Street, City of Williamsport, Bridge 17 Rehabilitation 385,000 18 (Base Construction Allocation - 19 $350,000) 20 (Design and Contingencies - $35,000) 21 (43) US 220, Northbound Bridge over 22 Lycoming Creek, City of Williamsport, 23 Bridge Rehabilitation 1,100,000 24 (Base Construction Allocation - 25 $1,000,000) 26 (Design and Contingencies - $100,000) 27 (44) I-180, Eastbound Bridge over Maynard 28 Street, City of Williamsport, Bridge 29 Widening and Deck Replacement 950,000 30 (Base Construction Allocation - 19990S0504B0514 - 321 -
1 $800,000) 2 (Design and Contingencies - $150,000) 3 (45) I-180, Westbound Bridge over Maynard 4 Street, City of Williamsport, Bridge 5 Widening and Deck Replacement 950,000 6 (Base Construction Allocation - 7 $800,000) 8 (Design and Contingencies - $150,000) 9 (46) I-180, Eastbound and Westbound 10 Bridges over Railroad, City of 11 Williamsport, Bridge Widening and Deck 12 Replacement 900,000 13 (Base Construction Allocation - 14 $750,000) 15 (Design and Contingencies - $150,000) 16 (47) I-180, Eastbound Bridge over Hepburn 17 Street, City of Williamsport, Bridge 18 Widening and Deck Replacement 1,200,000 19 (Base Construction Allocation - 20 $1,000,000) 21 (Design and Contingencies - $200,000) 22 (48) I-180, Westbound Bridge over Hepburn 23 Street, City of Williamsport, Bridge 24 Widening and Deck Replacement 1,200,000 25 (Base Construction Allocation - 26 $1,000,000) 27 (Design and Contingencies - $200,000) 28 (49) I-180, Eastbound Bridge over Basin 29 Street, City of Williamsport, Bridge 30 Rehabilitation 550,000 19990S0504B0514 - 322 -
1 (Base Construction Allocation - 2 $500,000) 3 (Design and Contingencies - $50,000) 4 (50) I-180, Westbound Bridge over Basin 5 Street, City of Williamsport, Bridge 6 Rehabilitation 550,000 7 (Base Construction Allocation - 8 $500,000) 9 (Design and Contingencies - $50,000) 10 (51) I-180, Eastbound and Westbound 11 Bridges over Muncy Creek, Muncy Creek 12 Township, Bridge Rehabilitation 1,100,000 13 (Base Construction Allocation - 14 $1,000,000) 15 (Design and Contingencies - $100,000) 16 (52) I-180, Eastbound and Westbound 17 Bridges over PA 405, Muncy Creek 18 Township, Bridge Rehabilitation 1,100,000 19 (Base Construction Allocation - 20 $1,000,000) 21 (Design and Contingencies - $100,000) 22 (53) I-180, Eastbound Bridge over SR 4024, 23 Muncy Creek Township, Bridge 24 Rehabilitation 550,000 25 (Base Construction Allocation - 26 $500,000) 27 (Design and Contingencies - $50,000) 28 (54) I-180, Eastbound and Westbound 29 Bridges over SR 2061, Muncy Creek 30 Township, Bridge Rehabilitation 660,000 19990S0504B0514 - 323 -
1 (Base Construction Allocation - 2 $600,000) 3 (Design and Contingencies - $60,000) 4 (55) I-180, Eastbound and Westbound 5 Bridges over SR 2014, Muncy Creek 6 Township, Bridge Rehabilitation 660,000 7 (Base Construction Allocation - 8 $600,000) 9 (Design and Contingencies - $60,000) 10 (56) SR 0180, I-180 Bridge over Loyalsock 11 Creek, Loyalsock Township and 12 Montoursville Borough, Bridge 13 Rehabilitation 800,000 14 (Base Construction Allocation - 15 $750,000) 16 (Design and Contingencies - $50,000) 17 (57) SR 0973, Hoagland Run Bridge over 18 Hoagland Run, Lycoming Township, Bridge 19 Replacement 620,000 20 (Base Construction Allocation - 21 $500,000) 22 (Land Allocation - $20,000) 23 (Design and Contingencies - $100,000) 24 (58) SR 2039, Mill Creek Bridge over Mill 25 Creek, Loyalsock Township, Bridge 26 Replacement 840,000 27 (Base Construction Allocation - 28 $680,000) 29 (Land Allocation - $30,000) 30 (Design and Contingencies - $130,000) 19990S0504B0514 - 324 -
1 (59) SR 8028, Ramp Bridge over Ramp N, 2 Platt Township, Bridge Deck 3 Replacement 1,500,000 4 (Base Construction Allocation - 5 $1,400,000) 6 (Design and Contingencies - $100,000) 7 Section 46. McKean County. 8 (a) Local Bridges 9 (1) Foster Township, T-359, Garlock Hollow 10 Bridge over Kendall Creek, Bridge 11 Replacement 580,000 12 (Base Construction Allocation - 13 $400,000) 14 (Land Allocation - $20,000) 15 (Design and Contingencies - $160,000) 16 (b) State Bridges 17 (1) SR 3009, Kinzua Creek Bridge over 18 Kinzua Creek, Borough of Mt. Jewett, 19 Bridge Replacement 880,000 20 (Base Construction Allocation - 21 $700,000) 22 (Land Allocation - $30,000) 23 (Design and Contingencies - $150,000) 24 (2) SR 4005, Kendall Creek Bridge over 25 Kendall Creek, City of Bradford, Bridge 26 Replacement 800,000 27 (Base Construction Allocation - 28 $650,000) 29 (Land Allocation - $50,000) 30 (Design and Contingencies - $100,000) 19990S0504B0514 - 325 -
1 (3) SR 9900, Kings Run Bridge over Kings 2 Run, Ceres Township, Bridge 3 Replacement 370,000 4 (Base Construction Allocation - 5 $280,000) 6 (Land Allocation - $10,000) 7 (Design and Contingencies - $80,000) 8 (4) SR 1002, Annin Creek Bridge, Annin 9 Township, Bridge Replacement 468,000 10 (Base Construction Allocation - 11 $373,000) 12 (Land Allocation - $15,000) 13 (Design and Contingencies - $80,000) 14 (5) SR 0006, Bridge over Potato Creek, 15 Keating Township, Bridge Replacement 300,000 16 (Base Construction Allocation - 17 $240,000) 18 (Land Allocation - $20,000) 19 (Design and Contingencies - $40,000) 20 (6) SR 0646, Pennbrook Run Bridge over 21 Pennbrook Run, Village of Gilmore, 22 Foster Township, Bridge Replacement 114,000 23 (Base Construction Allocation - 24 $90,000) 25 (Land Allocation - $4,000) 26 (Design and Contingencies - $20,000) 27 (7) SR 1002, Potato Creek Bridge over 28 Potato Creek, Keating Township, Bridge 29 Painting 410,000 30 (Base Construction Allocation - 19990S0504B0514 - 326 -
1 $400,000) 2 (Design and Contingencies - $10,000) 3 Section 47. Mercer County. 4 (a) Local Bridges 5 (1) City of Sharon, Service Avenue Bridge 6 over Pine Run, Bridge Replacement 240,000 7 (Base Construction Allocation - 8 $210,000) 9 (Land Allocation - $5,000) 10 (Design and Contingencies - $25,000) 11 (2) City of Sharon, Wengler Avenue Bridge 12 over Pine Hollow Run, Bridge 13 Replacement 218,000 14 (Base Construction Allocation - 15 $193,000) 16 (Land Allocation - $5,000) 17 (Design and Contingencies - $20,000) 18 (3) Pine Township, T-355, Pinchlong Road 19 Bridge over Swamp Run, Bridge 20 Replacement 203,000 21 (Base Construction Allocation - 22 $178,000) 23 (Land Allocation - $5,000) 24 (Design and Contingencies - $20,000) 25 (4) Pine Township, T-878, Diamond Road 26 Bridge over Wolf Creek, Bridge 27 Replacement 1,813,000 28 (Base Construction Allocation - 29 $1,668,000) 30 (Land Allocation - $60,000) 19990S0504B0514 - 327 -
1 (Design and Contingencies - $85,000) 2 (5) Pine Township, T-413, Daugherty Road 3 Bridge over Wolf Run, Bridge 4 Replacement 407,000 5 (Base Construction Allocation - 6 $352,000) 7 (Land Allocation - $15,000) 8 (Design and Contingencies - $40,000) 9 (6) Shenango Township, T-955, Oak Hill 10 Road Bridge over Turkey Run, Bridge 11 Replacement 297,000 12 (Base Construction Allocation - 13 $257,000) 14 (Land Allocation - $10,000) 15 (Design and Contingencies - $30,000) 16 (7) Shenango Township, Heasley Road Bridge 17 over Tributary of Shenango River, 18 Bridge Replacement 173,000 19 (Base Construction Allocation - 20 $155,000) 21 (Land Allocation - $3,000) 22 (Design and Contingencies - $15,000) 23 (8) Springfield Township, T-722, Spring 24 Road Bridge over Mill Run, Bridge 25 Replacement 230,000 26 (Base Construction Allocation - 27 $200,000) 28 (Land Allocation - $5,000) 29 (Design and Contingencies - $25,000) 30 (9) Worth Township, T-912, Jack Atwell 19990S0504B0514 - 328 -
1 Road Bridge over Wolf Creek, Bridge 2 Replacement 297,000 3 (Base Construction Allocation - 4 $257,000) 5 (Land Allocation - $10,000) 6 (Design and Contingencies - $30,000) 7 (10) Springfield Township, North Spring 8 Road Bridge, Bridge Replacement 245,000 9 (Base Construction Allocation - 10 $210,000) 11 (Land Allocation - $5,000) 12 (Design and Contingencies - $30,000) 13 (11) Delaware Township, T-634, Redfoot 14 Road Bridge over Otter Creek, Bridge 15 Replacement 220,000 16 (Base Construction Allocation - 17 $185,000) 18 (Land Allocation - $5,000) 19 (Design and Contingencies - $30,000) 20 (12) Fairview Township, T-623, Runkle Lane 21 Bridge over Coolspring Creek, Bridge 22 Replacement 220,000 23 (Base Construction Allocation - 24 $185,000) 25 (Land Allocation - $5,000) 26 (Design and Contingencies - $30,000) 27 (13) City of Hermitage, T-307, Lynnwood 28 Drive Bridge over Bobby Run, Bridge 29 Replacement 244,000 30 (Base Construction Allocation - 19990S0504B0514 - 329 -
1 $210,000) 2 (Land Allocation - $3,000) 3 (Design and Contingencies - $31,000) 4 (b) State Bridges 5 (1) SR 0058, SR 0058 over Sugar Creek, 6 Greene Township, Bridge Replacement 270,000 7 (Base Construction Allocation - 8 $200,000) 9 (Land Allocation - $20,000) 10 (Design and Contingencies - $50,00) 11 (2) SR 0058, SR 0058 over Tributary of 12 Shenango River, Greenville Borough, 13 Bridge Replacement 250,000 14 (Base Construction Allocation - 15 $200,000) 16 (Land Allocation - $20,000) 17 (Design and Contingencies - $30,000) 18 (3) SR 0058, SR 0058 over I-79, Findley 19 Township, Bridge Replacement 1,630,000 20 (Base Construction Allocation - 21 $1,500,000) 22 (Land Allocation - $30,000) 23 (Design and Contingencies - $100,000) 24 (4) SR 0062, SR 0062 over Shenango 25 River/Riverside Drive, City of Sharon, 26 Bridge Replacement 2,780,000 27 (Base Construction Allocation - 28 $2,500,000) 29 (Land Allocation - $30,000) 30 (Design and Contingencies - $250,000) 19990S0504B0514 - 330 -
1 (5) SR 0158, SR 0158 over Little 2 Neshannock Creek, Wilmington Township, 3 Bridge Replacement 770,000 4 (Base Construction Allocation - 5 $650,000) 6 (Land Allocation - $40,000) 7 (Design and Contingencies - $80,000) 8 (6) SR 0173, SR 0173 over Mill Creek, New 9 Lebanon Borough, Bridge Replacement 430,000 10 (Base Construction Allocation - 11 $350,000) 12 (Land Allocation - $20,000) 13 (Design and Contingencies - $60,000) 14 (7) SR 0208, SR 0208 over Wolf Creek, 15 Grove City Borough, Bridge Replacement 1,000,000 16 (Base Construction Allocation - 17 $870,000) 18 (Land Allocation - $30,000) 19 (Design and Contingencies - $100,000) 20 (8) SR 0258, SR 0258 over Daley Run, 21 Jefferson Township, Bridge Replacement 430,000 22 (Base Construction Allocation - 23 $350,000) 24 (Land Allocation - $20,000) 25 (Design and Contingencies - $60,000) 26 (9) SR 0318, SR 0318 over Shenango 27 River/Street/Railroad, West Middlesex 28 Borough, Bridge Replacement 4,400,000 29 (Base Construction Allocation - 30 $3,700,000) 19990S0504B0514 - 331 -
1 (Land Allocation - $100,000) 2 (Design and Contingencies - $600,000) 3 (10) SR 0518, SR 0518 over Pine Hollow 4 Run, City of Hermitage, Bridge 5 Replacement 410,000 6 (Base Construction Allocation - 7 $300,000) 8 (Land Allocation - $30,000) 9 (Design and Contingencies - $80,000) 10 (11) SR 0846, SR 0846 over Shenango 11 Reservoir, South Pymatuning Township, 12 Bridge Replacement 1,500,000 13 (Base Construction Allocation - 14 $1,340,000) 15 (Land Allocation - $10,000) 16 (Design and Contingencies - $150,000) 17 (12) SR 2006, SR 2006 over I-79, 18 Springfield Township, Bridge 19 Replacement 1,100,000 20 (Base Construction Allocation - 21 $1,000,000) 22 (Land Allocation - $10,000) 23 (Design and Contingencies - $90,000) 24 (13) SR 2014, SR 2014 over Mill Creek, 25 Findley Township, Bridge Replacement 330,000 26 (Base Construction Allocation - 27 $240,000) 28 (Land Allocation - $20,000) 29 (Design and Contingencies - $70,000) 30 (14) SR 2025, SR 2025 over Lake Barmore 19990S0504B0514 - 332 -
1 Outlet, Pine Township, Bridge 2 Replacement 300,000 3 (Base Construction Allocation - 4 $230,000) 5 (Land Allocation - $10,000) 6 (Design and Contingencies - $60,000) 7 (15) SR 3011, SR 3011 over I-80, Shenango 8 Township, Bridge Replacement 810,000 9 (Base Construction Allocation - 10 $700,000) 11 (Land Allocation - $10,000) 12 (Design and Contingencies - $100,000) 13 (16) SR 4014, SR 4014 over Shenango River, 14 Delaware Township, Bridge Replacement 920,000 15 (Base Construction Allocation - 16 $800,000) 17 (Land Allocation - $20,000) 18 (Design and Contingencies - $100,000) 19 (17) SR 0518, PA 516 (Walnut Street) 20 Bridge over Pine Hollow Road, City of 21 Hermitage, Bridge Replacement 550,000 22 (Base Construction Allocation - 23 $500,000) 24 (Design and Contingencies - $50,000) 25 (18) SR 4003, Wasser Bridge Road Bridge 26 over Shenango River, West Salem 27 Township, Bridge Replacement 1,620,000 28 (Base Construction Allocation - 29 $1,500,000) 30 (Land Allocation - $40,000) 19990S0504B0514 - 333 -
1 (Design and Contingencies - $80,000) 2 Section 48. Mifflin County. 3 (a) Local Bridges 4 (1) Oliver Township, T-803, Bridge over 5 Musser Run, Bridge Replacement 492,000 6 (Base Construction Allocation - 7 $390,000) 8 (Land Allocation - $2,000) 9 (Design and Contingencies - $100,000) 10 (2) Decatur Township, T-379, Bridge over 11 Meadow Creek, Bridge Replacement 370,000 12 (Base Construction Allocation - 13 $300,000) 14 (Land Allocation - $10,000) 15 (Design and Contingencies - $60,000) 16 (3) Burnham Borough, T-782, Buck Run 17 Bridge over Buck Run, Bridge 18 Replacement 892,000 19 (Base Construction Allocation - 20 $672,000) 21 (Land Allocation - $20,000) 22 (Design and Contingencies - $200,000) 23 (4) Menno Township, T-340, Kish Creek 24 Bridge over Kish Creek, Bridge 25 Replacement 262,000 26 (Base Construction Allocation - 27 $180,000) 28 (Land Allocation - $10,000) 29 (Design and Contingencies - $72,000) 30 (5) Oliver Township, T-702, Town Run 19990S0504B0514 - 334 -
1 Bridge over Town Run, Bridge 2 Replacement 340,000 3 (Base Construction Allocation - 4 $250,000) 5 (Land Allocation - $10,000) 6 (Design and Contingencies - $80,000) 7 (6) Wayne Township, T-357, Beaverdam Run 8 Bridge over Beaverdam Run, Bridge 9 Replacement 240,000 10 (Base Construction Allocation - 11 $160,000) 12 (Land Allocation - $20,000) 13 (Design and Contingencies - $60,000) 14 (7) Wayne Township, T-343, Long Hollow Run 15 Bridge over Long Hollow Run, Bridge 16 Rehabilitation 240,000 17 (Base Construction Allocation - 18 $140,000) 19 (Land Allocation - $20,000) 20 (Design and Contingencies - $80,000) 21 (b) State Bridges 22 (1) SR 0022, Bridge over Kish Creek, 23 Lewistown Borough, Bridge Painting 800,000 24 (Base Construction Allocation - 25 $720,000) 26 (Design and Contingencies - $80,000) 27 (2) SR 3017, Bridge over Juniata River, 28 Wayne Township, Bridge Painting 935,000 29 (Base Construction Allocation - 30 $850,000) 19990S0504B0514 - 335 -
1 (Design and Contingencies - $85,000) 2 (3) SR 0022, Strodes Run Bridge over 3 Strodes Run, Granville Township, Bridge 4 Replacement 665,000 5 (Base Construction Allocation - 6 $445,000) 7 (Land Allocation - $20,000) 8 (Design and Contingencies - $200,000) 9 (4) SR 0022, Bridge over Kishacaquillas 10 Creek, Lewistown Borough, Bridge 11 Painting 610,000 12 (Base Construction Allocation - 13 $600,000) 14 (Design and Contingencies - $10,000) 15 (5) SR 0305, Little Kish Creek Bridge over 16 Little Kish Creek, Belleville Borough, 17 Bridge Replacement 980,000 18 (Base Construction Allocation - 19 $800,000) 20 (Land Allocation - $30,000) 21 (Design and Contingencies - $150,000) 22 (6) SR 0322, Bridge over Kish Creek and 23 Conrail, Brown Township, Bridge 24 Replacement 9,300,000 25 (Base Construction Allocation - 26 $8,800,000) 27 (Land Allocation - $100,000) 28 (Design and Contingencies - $400,000) 29 (7) SR 0322, Bridge over T-315 and Jacks 30 Creek, Derry Township and Lewistown, 19990S0504B0514 - 336 -
1 Bridge Replacement 5,300,000 2 (Base Construction Allocation - 3 $4,800,000) 4 (Land Allocation - $100,000) 5 (Design and Contingencies - $400,000) 6 (8) SR 0655, Coffee Run Bridge over Coffee 7 Run, Brown Township, Bridge 8 Replacement 486,000 9 (Base Construction Allocation - 10 $376,000) 11 (Land Allocation - $10,000) 12 (Design and Contingencies - $100,000) 13 (9) SR 0655, Little Kish Creek Bridge over 14 Little Kish Creek, Union Township, 15 Bridge Replacement 390,000 16 (Base Construction Allocation - 17 $280,000) 18 (Land Allocation - $10,000) 19 (Design and Contingencies - $100,000) 20 (10) SR 1002, Honey Creek Bridge No.4 over 21 Honey Creek, Armagh Township, Bridge 22 Replacement 750,000 23 (Base Construction Allocation - 24 $600,000) 25 (Land Allocation - $75,000) 26 (Design and Contingencies - $75,000) 27 (11) SR 1005, Tea Creek Bridge over Tea 28 Creek, Brown Township, Bridge 29 Replacement 460,000 30 (Base Construction Allocation - 19990S0504B0514 - 337 -
1 $350,000) 2 (Land Allocation - $10,000) 3 (Design and Contingencies - $100,000) 4 (12) SR 1005, Bucks Run Bridge over Bucks 5 Run, Burnham Borough, Bridge 6 Replacement 820,000 7 (Base Construction Allocation - 8 $600,000) 9 (Land Allocation - $20,000) 10 (Design and Contingencies - $200,000) 11 (13) SR 2004, Jacks Creek Bridge over 12 Jacks Creek, Derry Township, Bridge 13 Replacement 720,000 14 (Base Construction Allocation - 15 $500,000) 16 (Land Allocation - $20,000) 17 (Design and Contingencies - $200,000) 18 (14) SR 3017, Juniata River Bridge over 19 Juniata River, Wayne Township, Bridge 20 Painting 815,000 21 (Base Construction Allocation - 22 $800,000) 23 (Design and Contingencies - $15,000) 24 (15) SR 4007, Musser Run Bridge over 25 Musser Run, Oliver Township, Bridge 26 Replacement 240,000 27 (Base Construction Allocation - 28 $150,000) 29 (Land Allocation - $10,000) 30 (Design and Contingencies - $80,000) 19990S0504B0514 - 338 -
1 (16) SR 4013, Strodes Run Bridge over 2 Strodes Run, Derry Township, Bridge 3 Replacement 300,000 4 (Base Construction Allocation - 5 $200,000) 6 (Land Allocation - $20,000) 7 (Design and Contingencies - $80,000) 8 Section 49. Monroe County. 9 (a) Local Bridges 10 (1) Hamilton Township, T-202, Bridge over 11 Lake Creek, Bridge Replacement 320,000 12 (Base Construction Allocation - 13 $270,000) 14 (Land Allocation - $10,000) 15 (Design and Contingencies - $40,000) 16 (2) Stroud Township, T-420, Bridge over 17 Cherry Creek, Bridge Replacement 360,000 18 (Base Construction Allocation - 19 $230,000) 20 (Land Allocation - $10,000) 21 (Design and Contingencies - $120,000) 22 (3) Smithfield Township, T-539, Bridge 23 over Marshalls Creek, Bridge 24 Rehabilitation 348,000 25 (Base Construction Allocation - 26 $288,000) 27 (Land Allocation - $10,000) 28 (Design and Contingencies - $50,000) 29 (4) Smithfield Township, T-522, Bridge 30 over Marshalls Creek, Bridge 19990S0504B0514 - 339 -
1 Replacement 134,000 2 (Base Construction Allocation - 3 $116,000) 4 (Land Allocation - $6,000) 5 (Design and Contingencies - $12,000) 6 (5) Barrett Township, T-612, Bridge over 7 Brodhead Creek, Bridge Replacement 174,000 8 (Base Construction Allocation - 9 $152,000) 10 (Land Allocation - $7,000) 11 (Design and Contingencies - $15,000) 12 (6) Hamilton Township, T-414, County 13 Bridge No. 7 over McMichael Creek, 14 Bridge Replacement 1,070,000 15 (Base Construction Allocation - 16 $840,000) 17 (Land Allocation - $30,000) 18 (Design and Contingencies - $200,000) 19 (7) Tunkhannock Township, T-633, Bridge 20 over Tunkhannock Creek, Bridge 21 Replacement 139,000 22 (Base Construction Allocation - 23 $121,000) 24 (Land Allocation - $6,000) 25 (Design and Contingencies - $12,000) 26 (8) Hamilton Township, T-233, County 27 Bridge No. 9 over McMichael Creek, 28 Bridge Replacement 665,000 29 (Base Construction Allocation - 30 $515,000) 19990S0504B0514 - 340 -
1 (Land Allocation - $10,000) 2 (Design and Contingencies - $140,000) 3 (9) Jackson Township, T-486, Bridge over 4 Trout Lake Spillway, Bridge 5 Replacement 184,000 6 (Base Construction Allocation - 7 $160,000) 8 (Land Allocation - $8,000) 9 (Design and Contingencies - $16,000) 10 (10) Hamilton Township, T-231, County 11 Bridge No. 8 over Appenzell Creek, 12 Bridge Replacement 565,000 13 (Base Construction Allocation - 14 $415,000) 15 (Land Allocation - $10,000) 16 (Design and Contingencies - $140,000) 17 (11) Coolbaugh Township, T-591, Steamtown 18 Railroad Bridge, Bridge Replacement 1,031,000 19 (Base Construction Allocation - 20 $937,000) 21 (Design and Contingencies - $94,000) 22 (12) Jackson Township, T-434, County 23 Bridge No. 13 over Appenzell Creek, 24 Bridge Replacement 667,000 25 (Base Construction Allocation - 26 $525,000) 27 (Land Allocation - $12,000) 28 (Design and Contingencies - $130,000) 29 (13) Hamilton Township, T-237, County 30 Bridge No. 12 over Lake Creek, Bridge 19990S0504B0514 - 341 -
1 Replacement 430,000 2 (Base Construction Allocation - 3 $300,000) 4 (Land Allocation - $10,000) 5 (Design and Contingencies - $120,000) 6 (b) State Bridges 7 (1) SR 0447, SR 0447 over Broadhead Creek 8 and Railroad, Stroud Township, Bridge 9 Rehabilitation 1,395,000 10 (Base Construction Allocation - 11 $1,071,000) 12 (Design and Contingencies - $324,000) 13 (2) SR 3003, Silver Spring Boulevard over 14 Chapple Creek, Eldred Township, Bridge 15 Replacement 280,000 16 (Base Construction Allocation - 17 $130,000) 18 (Land Allocation - $50,000) 19 (Design and Contingencies - $100,000) 20 (3) SR 2012, SR 2012 over Broadhead Creek, 21 East Stroudsburg Borough, Bridge 22 Rehabilitation 1,500,000 23 (Base Construction Allocation - 24 $1,150,000) 25 (Design and Contingencies - $350,000) 26 (4) SR 0080, I-80 Westbound over 27 Tunkhannock Creek at County Line, 28 Tobyhanna Township, Bridge 29 Rehabilitation 935,000 30 (Base Construction Allocation - 19990S0504B0514 - 342 -
1 $720,000) 2 (Design and Contingencies - $215,000) 3 (5) SR 0080, I-80 Eastbound over 4 Tunkhannock Creek at County Line, 5 Tunkhannock Township, Bridge 6 Rehabilitation 935,000 7 (Base Construction Allocation - 8 $720,000) 9 (Design and Contingencies - $215,000) 10 (6) SR 4003, SR 4003 over Lehigh River at 11 Lackawanna County Line, Coolbaugh 12 Township, Bridge Rehabilitation 390,000 13 (Base Construction Allocation - 14 $295,000) 15 (Design and Contingencies - $95,000) 16 (7) SR 0033, Northbound Bridge over US 209 17 Westbound, Hamilton Township, Bridge 18 Rehabilitation 180,000 19 (Base Construction Allocation - 20 $180,000) 21 (8) SR 0191, Stites Bridge, Stroudsburg 22 Township, Bridge Rehabilitation 600,000 23 (Base Construction Allocation - 24 $500,000) 25 (Design and Contingencies - $100,000) 26 (9) SR 0209, Bridge over I-80, Smithfield 27 Township, Bridge Rehabilitation 434,000 28 (Base Construction Allocation - 29 $334,000) 30 (Design and Contingencies - $100,000) 19990S0504B0514 - 343 -
1 (10) SR 0402, Ressica Falls Bridge over 2 Big Bushkill Creek, Middle Smithfield 3 Township, Bridge Replacement 1,520,000 4 (Base Construction Allocation - 5 $1,060,000) 6 (Land Allocation - $60,000) 7 (Design and Contingencies - $400,000) 8 (11) SR 0423, Warnertown Bridge over 9 Tobyhanna Creek, Coolbaugh Township, 10 Bridge Rehabilitation 977,000 11 (Base Construction Allocation - 12 $600,000) 13 (Land Allocation - $27,000) 14 (Design and Contingencies - $350,000) 15 (12) SR 0940, Pocono Summit Bridge over 16 Conrail, Tobyhanna Township, Bridge 17 Rehabilitation 1,250,000 18 (Base Construction Allocation - 19 $1,000,000) 20 (Land Allocation - $50,000) 21 (Design and Contingencies - $200,000) 22 (13) SR 1010, Bridge over Stony Creek, 23 Price Township, Bridge Replacement 310,000 24 (Base Construction Allocation - 25 $200,000) 26 (Land Allocation - $10,000) 27 (Design and Contingencies - $100,000) 28 (14) SR 2003, Bridge over Cherry Creek, 29 Hamilton Township, Bridge Replacement 205,000 30 (Base Construction Allocation - 19990S0504B0514 - 344 -
1 $139,000) 2 (Land Allocation - $13,000) 3 (Design and Contingencies - $53,000) 4 (15) SR 2004, Saylorsburg Bridge over SR 5 0033, Hamilton Township, Bridge 6 Rehabilitation 335,000 7 (Base Construction Allocation - 8 $304,000) 9 (Design and Contingencies - $31,000) 10 (16) SR 2017, Bridge over I-80 at Exit 51, 11 East Stroudsburg Borough, Bridge 12 Rehabilitation 689,000 13 (Base Construction Allocation - 14 $625,000) 15 (Design and Contingencies - $64,000) 16 (17) SR 2030, Water Gap Bridge over US 17 209, Smithfield Township, Bridge 18 Rehabilitation 1,390,000 19 (Base Construction Allocation - 20 $1,158,000) 21 (Design and Contingencies - $232,000) 22 (18) SR 3011, Bridge over Sugar Hollow 23 Creek, Chestnuthill Township, Bridge 24 Replacement 129,000 25 (Base Construction Allocation - 26 $117,000) 27 (Design and Contingencies - $12,000) 28 (19) SR 3016, Bridge over Pohopoco Creek, 29 Chestnuthill Township, Bridge 30 Replacement 139,000 19990S0504B0514 - 345 -
1 (Base Construction Allocation - 2 $121,000) 3 (Land Allocation - $6,000) 4 (Design and Contingencies - $12,000) 5 (20) SR 3018, Bridge No.1 over Kettle 6 Creek, Hamilton Township, Bridge 7 Replacement 80,000 8 (Base Construction Allocation - 9 $70,000) 10 (Land Allocation - $3,000) 11 (Design and Contingencies - $7,000) 12 (21) SR 3018, Bridge No.2 over Kettle 13 Creek, Hamilton Township, Bridge 14 Replacement 68,000 15 (Base Construction Allocation - 16 $59,000) 17 (Land Allocation - $3,000) 18 (Design and Contingencies - $6,000) 19 (22) SR 3022, Bridge over McMichael Creek, 20 Hamilton Township, Bridge Replacement 161,000 21 (Base Construction Allocation - 22 $140,000) 23 (Land Allocation - $7,000) 24 (Design and Contingencies - $14,000) 25 (23) SR 4001, Long Pond Bridge over 26 Tunkhannock Creek, Tunkhannock 27 Township, Bridge Replacement 1,454,000 28 (Base Construction Allocation - 29 $900,000) 30 (Land Allocation - $50,000) 19990S0504B0514 - 346 -
1 (Design and Contingencies - $500,000) 2 (24) SR 4007, Pocono Manor Bridge over E L 3 Railroad, Borough of Mt. Pocono, Bridge 4 Replacement 1,185,000 5 (Base Construction Allocation - 6 $935,000) 7 (Land Allocation - $50,000) 8 (Design and Contingencies - $200,000) 9 (25) SR 0080, Five Bridges over I-80 10 including SRs 0191, 0209, 2017, 2030 11 and 8026, Bridge Deck Rehabilitation 5,250,000 12 (Base Construction Allocation - 13 $3,500,000) 14 (Design and Contingencies - $1,750,000) 15 (26) SR 2017, Bridge over I-80, East 16 Stroudsburg Borough, Bridge Deck 17 Rehabilitation 1,500,000 18 (Base Construction Allocation - 19 $1,500,000) 20 Section 50. Montgomery County. 21 (a) Local Bridges 22 (1) Norristown Borough, Hospital Bridge 23 over Stony Creek, Bridge Replacement 412,000 24 (Base Construction Allocation - 25 $365,000) 26 (Land Allocation - $10,000) 27 (Design and Contingencies - $37,000) 28 (2) Trappe Borough, College Avenue Bridge 29 over Tributary of Perkiomen Creek, 30 Bridge Replacement 360,000 19990S0504B0514 - 347 -
1 (Base Construction Allocation - 2 $300,000) 3 (Land Allocation - $10,000) 4 (Design and Contingencies - $50,000) 5 (3) Towamencin Township, Bustard Road 6 Bridge over Towamencin Creek, Bridge 7 Replacement 454,000 8 (Base Construction Allocation - 9 $400,000) 10 (Land Allocation - $10,000) 11 (Design and Contingencies - $44,000) 12 (4) Upper Hanover Township, T-444, 13 Treichler Road Bridge under Reading 14 Railroad, Bridge Removal 151,000 15 (Base Construction Allocation - 16 $126,000) 17 (Land Allocation - $5,000) 18 (Design and Contingencies - $20,000) 19 (5) Upper Providence Township, T-400, 20 Supio Road Bridge under Reading 21 Railroad, Bridge Removal 187,000 22 (Base Construction Allocation - 23 $157,000) 24 (Land Allocation - $5,000) 25 (Design and Contingencies - $25,000) 26 (6) Upper Salford Township, T-444, Bridge 27 over Abandoned Railroad, Bridge 28 Removal 1,175,000 29 (Base Construction Allocation - 30 $1,000,000) 19990S0504B0514 - 348 -
1 (Land Allocation - $25,000) 2 (Design and Contingencies - $150,000) 3 (7) Norristown Borough, Markley Street 4 Bridge over Stoney Creek, Bridge 5 Replacement 1,250,000 6 (Base Construction Allocation - 7 $1,000,000) 8 (Land Allocation - $50,000) 9 (Design and Contingencies - $200,000) 10 (8) Norristown Borough, Markley Street 11 Bridge over Stoney Creek, Bridge 12 Rehabilitation 500,000 13 (Base Construction Allocation - 14 $400,000) 15 (Land Allocation - $10,000) 16 (Design and Contingencies - $90,000) 17 (9) Horsham Township, Davis Grove Road 18 over Park Creek, Bridge Replacement 300,000 19 (Base Construction Allocation - 20 $230,000) 21 (Land Allocation - $20,000) 22 (Design and Contingencies - $50,000) 23 (10) Franconia Township, Keller Creamery 24 Road over Indian Creek, Bridge 25 Replacement 320,000 26 (Base Construction Allocation - 27 $250,000) 28 (Land Allocation - $20,000) 29 (Design and Contingencies - $50,000) 30 (11) East Norriton Township, Germantown 19990S0504B0514 - 349 -
1 Pike over Five Mile Run Creek, Bridge 2 Replacement 500,000 3 (Base Construction Allocation - 4 $430,000) 5 (Land Allocation - $20,000) 6 (Design and Contingencies - $50,000) 7 (12) Upper Hanover Township, Eleventh 8 Street over Macoby Creek, Bridge 9 Replacement 400,000 10 (Base Construction Allocation - 11 $340,000) 12 (Land Allocation - $20,000) 13 (Design and Contingencies - $40,000) 14 (13) Lower Merion Township, Black Rock 15 Road over Mill Creek, Bridge 16 Replacement 350,000 17 (Base Construction Allocation - 18 $295,000) 19 (Land Allocation - $20,000) 20 (Design and Contingencies - $35,000) 21 (14) Lower Merion Township, Morris Road 22 over Mill Creek, Bridge Replacement 350,000 23 (Base Construction Allocation - 24 $285,000) 25 (Land Allocation - $20,000) 26 (Design and Contingencies - $45,000) 27 (15) Upper Merion Township, Conrail over 28 South Gulph Road, Bridge Replacement 4,500,000 29 (Base Construction Allocation - 30 $4,250,000) 19990S0504B0514 - 350 -
1 (Land Allocation - $50,000) 2 (Design and Contingencies - $200,000) 3 (16) Trappe Borough, College Avenue over 4 Buckwalter Tributary, Bridge 5 Replacement 140,000 6 (Base Construction Allocation - 7 $120,000) 8 (Design and Contingencies - $20,000) 9 (b) State Bridges 10 (1) SR 2009, Byberry Road Bridge over 11 Southampton Creek, Upper Moreland 12 Township and Bryn Athyn Borough, 13 Historic Bridge Replacement 680,000 14 (Base Construction Allocation - 15 $500,000) 16 (Land Allocation - $20,000) 17 (Design and Contingencies - $160,000) 18 (2) SR 2018, Bethlehem Pike Bridge over 19 Branch of Wissahickon Creek, 20 Springfield Township, Bridge 21 Rehabilitation 525,000 22 (Base Construction Allocation - 23 $400,000) 24 (Land Allocation - $25,000) 25 (Design and Contingencies - $100,000) 26 (3) SR 4030, New Hanover Square Road 27 Bridge over West Swamp Creek (Two 28 Bridges), New Hanover Township, Bridge 29 Replacement 1,150,000 30 (Base Construction Allocation - 19990S0504B0514 - 351 -
1 $900,000) 2 (Land Allocation - $50,000) 3 (Design and Contingencies - $200,000) 4 (4) SR 0100, Extended, (Three Bridges), 5 High Street to Farmington Road, 6 Pottstown Borough and Upper Pottsgrove 7 Township, Bridge Rehabilitation 1,650,000 8 (Base Construction Allocation - 9 $1,500,000) 10 (Land Allocation - $50,000) 11 (Design and Contingencies - $100,000) 12 (5) SR 1017, Salfordville Road Bridge over 13 East Branch of Perkiomen Creek, Lower 14 Salford Township, Bridge Replacement 1,500,000 15 (Base Construction Allocation - 16 $1,250,000) 17 (Land Allocation - $50,000) 18 (Design and Contingencies - $200,000) 19 (6) SR 1024, Salford Station (Two Bridges) 20 over Perkiomen Creek, Upper Salford and 21 Lower Fredrick Townships, Bridge 22 Replacement 1,200,000 23 (Base Construction Allocation - 24 $1,000,000) 25 (Land Allocation - $50,000) 26 (Design and Contingencies - $150,000) 27 (7) SR 3020, Dannehower Bridge over River 28 and New US 202, Upper Merion Township, 29 Bridgeport and Norristown Boroughs, 30 Bridge Painting 872,000 19990S0504B0514 - 352 -
1 (Base Construction Allocation - 2 $802,000) 3 (Design and Contingencies - $70,000) 4 (8) SR 3039, South Gulph Road Overpass 5 under Conrail, Upper Merion Township, 6 Bridge Replacement 1,500,000 7 (Base Construction Allocation - 8 $1,300,000) 9 (Land Allocation - $50,000) 10 (Design and Contingencies - $150,000) 11 (9) SR 4003, Black Rock Road Bridge over 12 Abandoned Reading Track, Upper 13 Providence Township, Bridge Removal 205,000 14 (Base Construction Allocation - 15 $175,000) 16 (Land Allocation - $10,000) 17 (Design and Contingencies - $20,000) 18 (10) SR 4012, Graterford Road Bridge over 19 Perkiomen Creek, Skippack and Perkiomen 20 Townships, Bridge Replacement 1,475,000 21 (Base Construction Allocation - 22 $1,300,000) 23 (Land Allocation - $50,000) 24 (Design and Contingencies - $125,000) 25 (11) SR 4031, Ridge Pike Bridge over 26 Manatawny Creek, Pottstown Borough, 27 Bridge Replacement 2,053,000 28 (Base Construction Allocation - 29 $1,935,000) 30 (Land Allocation - $45,000) 19990S0504B0514 - 353 -
1 (Design and Contingencies - $73,000) 2 (12) SR 0463, Horsham Road Bridge over 3 Upper State Road, Montgomery Township, 4 Bridge Replacement 1,100,000 5 (Base Construction Allocation - 6 $950,000) 7 (Land Allocation - $150,000) 8 (13) SR 0422, Pottstown Expressway Bridge 9 over Schuylkill River, Lower Pottsgrove 10 Township, Bridge Deck Rehabilitation 310,000 11 (Base Construction Allocation - 12 $240,000) 13 (Land Allocation - $10,000) 14 (Design and Contingencies - $60,000) 15 (14) SR 3020, Dannehower Bridge over 16 Schuylkill River, Parkway and Railroad, 17 Upper Merion Township, Bridge Deck 18 Rehabilitation 1,420,000 19 (Base Construction Allocation - 20 $1,165,000) 21 (Land Allocation - $40,000) 22 (Design and Contingencies - $215,000) 23 Section 51. Montour County. 24 (a) Local Bridges 25 (1) Derry Township, T-407, County Bridge 26 No.13 over West Branch of Chillisquaque 27 Creek near Washingtonville Borough, 28 Bridge Replacement 350,000 29 (Base Construction Allocation - 30 $265,000) 19990S0504B0514 - 354 -
1 (Land Allocation - $35,000) 2 (Design and Contingencies - $50,000) 3 (b) State Bridges 4 (1) SR 1004, Bridge over Chillisquaque 5 Creek, North of Washingtonville 6 Borough, Bridge Replacement 620,000 7 (Base Construction Allocation - 8 $500,000) 9 (Land Allocation - $40,000) 10 (Design and Contingencies - $80,000) 11 (2) SR 1006, Bridge over Branch of 12 Chillisquaque Creek, 3 Miles Northwest 13 of Washingtonville Borough, Bridge 14 Replacement 510,000 15 (Base Construction Allocation - 16 $410,000) 17 (Land Allocation - $25,000) 18 (Design and Contingencies - $80,000) 19 (3) SR 3004, Bridge over Beaver Run, 2 20 Miles West of Moresburg, Bridge 21 Replacement 285,000 22 (Base Construction Allocation - 23 $227,000) 24 (Land Allocation - $14,000) 25 (Design and Contingencies - $44,000) 26 (4) SR 4001, Bridge over Chillisquaque 27 Creek, Anthony Township, Bridge 28 Replacement 458,000 29 (Base Construction Allocation - 30 $366,000) 19990S0504B0514 - 355 -
1 (Land Allocation - $23,000) 2 (Design and Contingencies - $69,000) 3 (5) SR 0011, SR 0011 over Sechler Run, 4 Mahoning Township, Bridge Replacement 582,000 5 (Base Construction Allocation - 6 $466,000) 7 (Land Allocation - $29,000) 8 (Design and Contingencies - $87,000) 9 (6) SR 0054, SR 0054 over Chillisquaque 10 Creek, Anthony Township, Bridge 11 Replacement 547,000 12 (Base Construction Allocation - 13 $438,000) 14 (Land Allocation - $27,000) 15 (Design and Contingencies - $82,000) 16 (7) SR 0642, SR 0642 over Mahoning Creek, 17 West Hemlock Township, Bridge 18 Replacement 213,000 19 (Base Construction Allocation - 20 $170,000) 21 (Land Allocation - $11,000) 22 (Design and Contingencies - $32,000) 23 (8) SR 1009, SR 1009 over Branch of Lowry 24 Run, Anthony Township, Bridge 25 Replacement 431,000 26 (Base Construction Allocation - 27 $345,000) 28 (Land Allocation - $21,000) 29 (Design and Contingencies - $65,000) 30 (9) SR 1011, SR 1011 over Tributary of 19990S0504B0514 - 356 -
1 Chillisquaque Creek, Anthony Township, 2 Bridge Replacement 212,000 3 (Base Construction Allocation - 4 $170,000) 5 (Land Allocation - $11,000) 6 (Design and Contingencies - $31,000) 7 Section 52. Northampton County. 8 (a) Local Bridges 9 (1) Lehigh Township, Indiantrail Road 10 Bridge over Indian Creek, Bridge 11 Painting 16,000 12 (Base Construction Allocation - 13 $14,000) 14 (Design and Contingencies - $2,000) 15 (2) Lehigh Township, T-548, Bridge over 16 Bertsch Creek, Bridge Replacement 400,000 17 (Base Construction Allocation - 18 $300,000) 19 (Land Allocation - $20,000) 20 (Design and Contingencies - $80,000) 21 (3) Lehigh Township, Wood Drive Bridge, 22 Bridge Replacement 65,000 23 (Base Construction Allocation - 24 $41,000) 25 (Land Allocation - $4,000) 26 (Design and Contingencies - $20,000) 27 (4) Freemansburg Borough, LVRR Bridge over 28 Main Street, Bridge Removal 898,000 29 (Base Construction Allocation - 30 $694,000) 19990S0504B0514 - 357 -
1 (Land Allocation - $100,000) 2 (Design and Contingencies - $104,000) 3 (5) City of Bethlehem, County Bridge 4 No.88, Bridge over Monocacy Creek, 5 Bridge Rehabilitation 275,000 6 (Base Construction Allocation - 7 $250,000) 8 (Design and Contingencies - $25,000) 9 (b) State Bridges 10 (1) SR 2017, Tatamy Road over Tributary of 11 Bushkill Creek, Palmer Township, Bridge 12 Rehabilitation 240,000 13 (Base Construction Allocation - 14 $100,000) 15 (Land Allocation - $40,000) 16 (Design and Contingencies - $100,000) 17 (2) SR 4020, Maple Drive over Tributary of 18 Bertsch Creek, Lehigh Township, Bridge 19 Rehabilitation 465,000 20 (Base Construction Allocation - 21 $275,000) 22 (Land Allocation - $80,000) 23 (Design and Contingencies - $110,000) 24 (3) SR 0611, Railroad Bridge over SR 0611, 25 Borough of Portland, Bridge 26 Reconstruction 2,500,000 27 (Base Construction Allocation - 28 $1,800,000) 29 (Land Allocation - $170,000) 30 (Design and Contingencies - $530,000) 19990S0504B0514 - 358 -
1 (4) SR 0033, Bridges over Van Buren Road 2 and SR 1002, Palmer Township, Bridge 3 Deck Rehabilitation 3,000,000 4 (Base Construction Allocation - 5 $3,000,000) 6 (5) SR 0378, Overhead Bridges on Broad, 7 14th and Eaton Avenue, City of 8 Bethlehem, Bridge Rehabilitation 1,500,000 9 (Base Construction Allocation - 10 $1,500,000) 11 (6) SR 0611, Sandts Eddy Arch Bridge over 12 Mud Run, Lower Mt. Bethel Township, 13 Bridge Replacement 800,000 14 (Base Construction Allocation - 15 $700,000) 16 (Land Allocation - $20,000) 17 (Design and Contingencies - $80,000) 18 Section 53. Northumberland County. 19 (a) Local Bridges 20 (1) Borough of Milton, Ridge Avenue over 21 Limestone Run, Bridge Replacement 520,000 22 (Base Construction Allocation - 23 $380,000) 24 (Land Allocation - $20,000) 25 (Design and Contingencies - $120,000) 26 (2) Lewis Township, T-631, Old State Road 27 Bridge over Branch of Beaver Run, 28 Bridge Replacement 220,000 29 (Base Construction Allocation - 30 $200,000) 19990S0504B0514 - 359 -
1 (Design and Contingencies - $20,000) 2 (3) Ralpho Township, County Bridge No.183, 3 Bridge Replacement 190,000 4 (b) State Bridges 5 (1) SR 0642, Chillisquaque Creek Bridge 6 over Chillisquaque Creek, 0.5 Mile East 7 of Pottsgrove, Bridge Deck Replacement 1,184,000 8 (Base Construction Allocation - 9 $947,000) 10 (Land Allocation - $59,000) 11 (Design and Contingencies - $178,000) 12 (2) SR 1005, Delaware Run Bridge over 13 Delaware Run, 3 Miles North of 14 Watsontown Borough, Bridge Replacement 509,000 15 (Base Construction Allocation - 16 $408,000) 17 (Land Allocation - $25,000) 18 (Design and Contingencies - $76,000) 19 (3) SR 0045, Bridge over Chillisquaque 20 Creek, East of SR 0147, Bridge 21 Painting 260,000 22 (Base Construction Allocation - 23 $250,000) 24 (Design and Contingencies - $10,000) 25 (4) SR 0054, SR 0054 over North Branch of 26 Shamokin Creek, Mt. Carmel Township, 27 Bridge Replacement 721,000 28 (Base Construction Allocation - 29 $577,000) 30 (Land Allocation - $36,000) 19990S0504B0514 - 360 -
1 (Design and Contingencies - $108,000) 2 (5) SR 2001, SR 2001 over Little Roaring 3 Creek, Rush Township, Bridge 4 Replacement 415,000 5 (Base Construction Allocation - 6 $335,000) 7 (Land Allocation - $20,000) 8 (Design and Contingencies - $60,000) 9 (6) SR 2023, SR 2023 over Conrail, Mt. 10 Carmel Township, Bridge Replacement 1,275,000 11 (Base Construction Allocation - 12 $1,020,000) 13 (Land Allocation - $64,000) 14 (Design and Contingencies - $191,000) 15 (7) SR 4013, SR 4013 over Plum Creek, 16 Rockefeller Township, Bridge 17 Replacement 361,000 18 (Base Construction Allocation - 19 $289,000) 20 (Land Allocation - $18,000) 21 (Design and Contingencies - $54,000) 22 (8) SR 0011, Railroad Overpass Bridge over 23 Water Street, Northumberland Borough, 24 Bridge Rehabilitation 3,500,000 25 (Base Construction Allocation - 26 $3,200,000) 27 (Land Allocation - $100,000) 28 (Design and Contingencies - $200,000) 29 (9) SR 1025, Chillisquaque Creek Bridge 30 over Chillisquaque Creek, East 19990S0504B0514 - 361 -
1 Chillisquaque Township, Bridge 2 Painting 135,000 3 (Base Construction Allocation - 4 $125,000) 5 (Design and Contingencies - $10,000) 6 (10) SR 3006, Mahanoy Creek Bridge over 7 Mahanoy Creek, Jackson Township, Bridge 8 Painting 360,000 9 (Base Construction Allocation - 10 $350,000) 11 (Design and Contingencies - $10,000) 12 Section 54. Perry County. 13 (a) Local Bridges 14 (1) Tyrone Township, County Bridge No.4, 15 Rices Bridge over Shermans Creek, 16 Covered Bridge Replacement 768,000 17 (Base Construction Allocation - 18 $552,000) 19 (Land Allocation - $77,000) 20 (Design and Contingencies - $139,000) 21 (2) Northeast Madison Township, T-403 over 22 Bixler Run, Bridge Replacement 585,000 23 (Base Construction Allocation - 24 $400,000) 25 (Land Allocation - $10,000) 26 (Design and Contingencies - $175,000) 27 (3) Tyrone Township, Rices Bridge (County 28 Bridge No.4) over Shermans Creek, 29 Bridge Replacement 768,000 30 (Base Construction Allocation - 19990S0504B0514 - 362 -
1 $552,000) 2 (Land Allocation - $77,000) 3 (Design and Contingencies - $139,000) 4 (b) State Bridges 5 (1) SR 4006, Raccoon Creek Bridge over 6 Raccoon Creek, Tuscarora Township, 7 Bridge Replacement 466,000 8 (Base Construction Allocation - 9 $288,000) 10 (Land Allocation - $20,000) 11 (Design and Contingencies - $158,000) 12 (2) SR 3002, Horse Valley Road Bridges 13 (Two Bridges) over Horse Valley Run, 14 Toboyne Township, Bridge Replacement 725,000 15 (Base Construction Allocation - 16 $700,000) 17 (Land Allocation - $5,000) 18 (Design and Contingencies - $20,000) 19 Section 55. Philadelphia County. 20 (a) Local Bridges 21 (1) City of Philadelphia, Byberry Road 22 Bridge over Conrail, Temporary Bridge 23 Construction 511,000 24 (Base Construction Allocation - 25 $390,000) 26 (Land Allocation - $51,000) 27 (Design and Contingencies - $70,000) 28 (2) City of Philadelphia, Wyoming Avenue 29 Bridge over Former Course Frankford 30 Creek, West of Castor Avenue, Bridge 19990S0504B0514 - 363 -
1 Replacement 1,300,000 2 (Base Construction Allocation - 3 $1,200,000) 4 (Design and Contingencies - $100,000) 5 (3) City of Philadelphia, Chelten Avenue 6 Bridge over SEPTA, West of Wayne 7 Avenue, Bridge Replacement 2,300,000 8 (Base Construction Allocation - 9 $2,100,000) 10 (Design and Contingencies - $200,000) 11 (4) City of Philadelphia, Fisher's Lane 12 Bridge over Tacony Creek, West of 13 Ramona Avenue, Bridge Replacement 1,625,000 14 (Base Construction Allocation - 15 $1,400,000) 16 (Design and Contingencies - $225,000) 17 (5) City of Philadelphia, Kingsessing 18 Avenue Bridge over SEPTA, Bridge 19 Replacement 2,550,000 20 (Base Construction Allocation - 21 $2,200,000) 22 (Land Allocation - $100,000) 23 (Design and Contingencies - $250,000) 24 (6) City of Philadelphia, Montgomery 25 Bridge over Amtrak, Bridge Replacement 5,275,000 26 (Base Construction Allocation - 27 $4,750,000) 28 (Land Allocation - $125,000) 29 (Design and Contingencies - $400,000) 30 (7) City of Philadelphia, Thomas Avenue 19990S0504B0514 - 364 -
1 Bridge over SEPTA, Bridge Replacement 3,150,000 2 (Base Construction Allocation - 3 $2,750,000) 4 (Land Allocation - $100,000) 5 (Design and Contingencies - $300,000) 6 (8) City of Philadelphia, Sedgley Avenue 7 Bridge over Conrail, Bridge 8 Replacement 1,000,000 9 (Base Construction Allocation - 10 $800,000) 11 (Land Allocation - $100,000) 12 (Design and Contingencies - $100,000) 13 (9) City of Philadelphia, Lexington Avenue 14 Bridge over Conrail, Bridge 15 Replacement 420,000 16 (Base Construction Allocation - 17 $360,000) 18 (Land Allocation - $20,000) 19 (Design and Contingencies - $40,000) 20 (10) City of Philadelphia, Greenland 21 Bridge over Conrail and I-76, Bridge 22 Replacement 1,350,000 23 (Base Construction Allocation - 24 $1,100,000) 25 (Land Allocation - $100,000) 26 (Design and Contingencies - $150,000) 27 (11) City of Philadelphia, Glenwood Drive 28 Bridge over Conrail, Bridge 29 Replacement 1,450,000 30 (Base Construction Allocation - 19990S0504B0514 - 365 -
1 $1,200,000) 2 (Land Allocation - $100,000) 3 (Design and Contingencies - $150,000) 4 (12) City of Philadelphia, Second Street 5 Bridge over Conrail, Bridge 6 Replacement 740,000 7 (Base Construction Allocation - 8 $650,000) 9 (Land Allocation - $20,000) 10 (Design and Contingencies - $70,000) 11 (13) City of Philadelphia, Cambria Street 12 Bridge over Conrail, Bridge 13 Replacement 2,750,000 14 (Base Construction Allocation - 15 $2,400,000) 16 (Land Allocation - $100,000) 17 (Design and Contingencies - $250,000) 18 (b) State Bridges 19 (1) SR 4007, Germantown Avenue Bridge, 20 Conrail Overpass, City of Philadelphia, 21 Bridge Removal 125,000 22 (Base Construction Allocation - 23 $100,000) 24 (Land Allocation - $10,000) 25 (Design and Contingencies - $15,000) 26 (2) SR 0076, Schuylkill Expressway Bridge 27 over Schuylkill River, City of 28 Philadelphia, Bridge Painting 2,580,000 29 (Base Construction Allocation - 30 $2,390,000) 19990S0504B0514 - 366 -
1 (Design and Contingencies - $190,000) 2 (3) SR 2003, 5th Street Bridge over 3 Amtrak, City of Philadelphia, Bridge 4 Replacement 2,400,000 5 (Base Construction Allocation - 6 $2,000,000) 7 (Land Allocation - $200,000) 8 (Design and Contingencies - $200,000) 9 (4) SR 3008, Chestnut Street Bridge over 10 Schuylkill River, City of Philadelphia, 11 Bridge Painting 477,000 12 (Base Construction Allocation - 13 $426,000) 14 (Design and Contingencies - $51,000) 15 (5) SR 3037, JFK Boulevard Bridge over 16 Schuylkill River, City of Philadelphia, 17 Bridge Painting 857,000 18 (Base Construction Allocation - 19 $794,000) 20 (Design and Contingencies - $63,000) 21 (6) SR 0095, Delaware River Expressway 22 over Westmoreland and Tioga Streets, 23 City of Philadelphia, Bridge 24 Rehabilitation 4,450,000 25 (Base Construction Allocation - 26 $4,200,000) 27 (Land Allocation - $50,000) 28 (Design and Contingencies - $200,000) 29 (7) SR 0003, Chestnut Street Bridge over 30 Amtrak, Schuylkill Expressway and 30th 19990S0504B0514 - 367 -
1 Street, City of Philadelphia, Bridge 2 Replacement 11,800,000 3 (Base Construction Allocation - 4 $10,000,000) 5 (Land Allocation - $1,000,000) 6 (Design and Contingencies - $800,000) 7 (8) SR 0013, Girard Avenue Bridge over 8 Schuylkill Expressway, City of 9 Philadelphia, Bridge Deck Replacement 1,733,000 10 (Base Construction Allocation - 11 $1,533,000) 12 (Land Allocation - $50,000) 13 (Design and Contingencies - $150,000) 14 (9) SR 0073, Cottman Avenue Bridge over 15 Conrail, City of Philadelphia, Bridge 16 Replacement 2,100,000 17 (Base Construction Allocation - 18 $1,500,000) 19 (Land Allocation - $300,000) 20 (Design and Contingencies - $300,000) 21 Section 56. Pike County. 22 (a) Local Bridges (Reserved) 23 (b) State Bridges 24 (1) SR 0390, Bridge Kill Creek Bridge, 25 North of SR 3002, Green Township, 26 Bridge Replacement 430,000 27 (Base Construction Allocation - 28 $340,000) 29 (Land Allocation - $10,000) 30 (Design and Contingencies - $80,000) 19990S0504B0514 - 368 -
1 (2) SR 2011, Bridge over Outlet to Sawkill 2 Pond, South of TR 6, Dingman Township, 3 Bridge Replacement 355,000 4 (Base Construction Allocation - 5 $275,000) 6 (Land Allocation - $10,000) 7 (Design and Contingencies - $70,000) 8 (3) SR 0434, Shohola Bridge over Delaware 9 River, Shohola Township and New York 10 State Line, Bridge Painting 2,200,000 11 (Base Construction Allocation - 12 $2,000,000) 13 (Design and Contingencies - $200,000) 14 (4) State Bridges, Countywide Bridge Zone 15 Painting, Bridge Painting 370,000 16 (Base Construction Allocation - 17 $350,000) 18 (Land Allocation - $10,000) 19 (Design and Contingencies - $10,000) 20 Section 57. Potter County. 21 (a) Local Bridges (Reserved) 22 (b) State Bridges 23 (1) SR 3015, Baker Hollow Bridge over 24 Baker Run, Homer Township, Bridge 25 Replacement 290,000 26 (Base Construction Allocation - 27 $200,000) 28 (Land Allocation - $10,000) 29 (Design and Contingencies - $80,000) 30 (2) SR 0006, Bridge over Allegheny River, 19990S0504B0514 - 369 -
1 Coudersport Borough, Bridge Painting 325,000 2 (Base Construction Allocation - 3 $320,000) 4 (Design and Contingencies - $5,000) 5 (3) SR 4003, Bradley Run Bridge over 6 Bradley Run, Clara Township, Bridge 7 Replacement 520,000 8 (Base Construction Allocation - 9 $400,000) 10 (Land Allocation - $20,000) 11 (Design and Contingencies - $100,000) 12 (4) SR 4013, North Hollow Run Bridge over 13 Branch of North Hollow Run, Coudersport 14 Borough and Sweden Township, Bridge 15 Replacement 350,000 16 (Base Construction Allocation - 17 $260,000) 18 (Land Allocation - $10,000) 19 (Design and Contingencies - $80,000) 20 (5) SR 1003, Judson Run Bridge over Judson 21 Run, Pike Township, Bridge Replacement 340,000 22 (Base Construction Allocation - 23 $250,000) 24 (Land Allocation - $10,000) 25 (Design and Contingencies - $80,000) 26 (6) SR 1010, Genesee River Bridge over 27 Genesee River, Genesee Township, Bridge 28 Painting 68,000 29 (Base Construction Allocation - 30 $58,000) 19990S0504B0514 - 370 -
1 (Design and Contingencies - $10,000) 2 Section 58. Schuylkill County. 3 (a) Local Bridges 4 (1) City of Pottsville, Washington Street 5 Bridge No.2 over Conrail and PA 61, 6 Bridge Replacement 2,225,000 7 (Base Construction Allocation - 8 $2,000,000) 9 (Land Allocation - $25,000) 10 (Design and Contingencies - $200,000) 11 (2) Pine Grove Township, Penn Central 12 Bridge over T-390, Bridge Removal 551,000 13 (Base Construction Allocation - 14 $435,000) 15 (Land Allocation - $50,000) 16 (Design and Contingencies - $66,000) 17 (3) Rush Township, T-862, Bridge No.42 18 over Pine Creek, Bridge Replacement 139,000 19 (Base Construction Allocation - 20 $121,000) 21 (Land Allocation - $6,000) 22 (Design and Contingencies - $12,000) 23 (4) St. Clair Borough, Russell Street 24 Bridge over Mill Creek, Bridge 25 Replacement 223,000 26 (Base Construction Allocation - 27 $193,000) 28 (Land Allocation - $10,000) 29 (Design and Contingencies - $20,000) 30 (5) Upper Mahantongo Township, T-473, 19990S0504B0514 - 371 -
1 Bridge over Mahantongo Creek, Bridge 2 Replacement 202,000 3 (Base Construction Allocation - 4 $175,000) 5 (Land Allocation - $9,000) 6 (Design and Contingencies - $18,000) 7 (6) East Brunswick Township, T-753, Bridge 8 over Indian Run, Bridge Replacement 400,000 9 (Base Construction Allocation - 10 $290,000) 11 (Land Allocation - $10,000) 12 (Design and Contingencies - $100,000) 13 (7) West Brunswick Township, County Bridge 14 No.94 over Schuylkill River, Bridge 15 Replacement 384,000 16 (Base Construction Allocation - 17 $384,000) 18 (8) Tremont Borough, Maple Street Bridge 19 No.22 over Goodspring Creek, Bridge 20 Replacement 214,000 21 (Base Construction Allocation - 22 $178,000) 23 (Design and Contingencies - $36,000) 24 (9) Gilberton Borough, Bridge Street 25 Bridge over Mahanoy Creek, Bridge 26 Replacement 520,000 27 (Base Construction Allocation - 28 $400,000) 29 (Land Allocation - $20,000) 30 (Design and Contingencies - $100,000) 19990S0504B0514 - 372 -
1 (10) Porter Township, T-416, Bridge No.79 2 over Wiconisco Creek, Bridge 3 Replacement 287,000 4 (Base Construction Allocation - 5 $250,000) 6 (Land Allocation - $12,000) 7 (Design and Contingencies - $25,000) 8 (11) Union Township, T-594, Bridge over 9 Little Catawissa Creek, Bridge 10 Replacement 296,000 11 (Base Construction Allocation - 12 $230,000) 13 (Land Allocation - $5,000) 14 (Design and Contingencies - $61,000) 15 (12) Deer Lake Borough, Drehersville Road 16 Bridge over Pine Creek, Bridge 17 Replacement 484,000 18 (Base Construction Allocation - 19 $324,000) 20 (Land Allocation - $10,000) 21 (Design and Contingencies - $150,000) 22 (13) Port Carbon Borough, Mill Street 23 Bridge No.106 over Schuylkill River, 24 Bridge Replacement 1,050,000 25 (Base Construction Allocation - 26 $750,000) 27 (Land Allocation - $50,000) 28 (Design and Contingencies - $250,000) 29 (14) Hegins Township, T-478, Broad Street 30 Bridge over Pine Creek, Bridge 19990S0504B0514 - 373 -
1 Replacement 357,000 2 (Base Construction Allocation - 3 $290,000) 4 (Land Allocation - $5,000) 5 (Design and Contingencies - $62,000) 6 (15) Frackville Borough, Spring Street 7 Reading Railroad Bridge, Bridge 8 Removal 112,000 9 (Base Construction Allocation - 10 $52,000) 11 (Land Allocation - $10,000) 12 (Design and Contingencies - $50,000) 13 (16) Eldred Township, T-383, Bridge over 14 Mahantango Creek, Bridge Replacement 121,000 15 (Base Construction Allocation - 16 $110,000) 17 (Design and Contingencies - $11,000) 18 (17) Port Clinton Borough, Broad Street, 19 County Bridge No.123 over Schuylkill 20 River, Bridge Replacement 828,000 21 (Base Construction Allocation - 22 $692,000) 23 (Land Allocation - $32,000) 24 (Design and Contingencies - $104,000) 25 (18) South Manheim Township, T-676 County 26 Bridge No.112 over Bear Creek, Bridge 27 Replacement 470,000 28 (Base Construction Allocation - 29 $300,000) 30 (Land Allocation - $20,000) 19990S0504B0514 - 374 -
1 (Design and Contingencies - $150,000) 2 (19) Port Carbon Borough, Washington 3 Street Bridge over Mill Creek, Bridge 4 Replacement 684,000 5 (Base Construction Allocation - 6 $564,000) 7 (Land Allocation - $20,000) 8 (Design and Contingencies - $100,000) 9 (20) City of Pottsville, Washington Street 10 over Conrail and SR 0061, Bridge 11 Rehabilitation 803,000 12 (Base Construction Allocation - 13 $669,000) 14 (Design and Contingencies - $134,000) 15 (21) St. Clair Borough, Russell Street 16 Bridge over Mill Creek, Bridge 17 Replacement 480,000 18 (Base Construction Allocation - 19 $350,000) 20 (Land Allocation - $10,000) 21 (Design and Contingencies - $120,000) 22 (22) North Union Township, T-455, Bridge 23 over Tomhicken Creek, Bridge 24 Replacement 360,000 25 (Base Construction Allocation - 26 $250,000) 27 (Land Allocation - $10,000) 28 (Design and Contingencies - $100,000) 29 (23) West Brunswick Township, T-723, 30 Industrial Road over Pine Creek, Bridge 19990S0504B0514 - 375 -
1 Replacement 584,000 2 (Base Construction Allocation - 3 $434,000) 4 (Land Allocation - $20,000) 5 (Design and Contingencies - $130,000) 6 (24) Landingville Borough, Canal Street 7 Bridge over Schuylkill River, Bridge 8 Replacement 810,000 9 (Base Construction Allocation - 10 $640,000) 11 (Land Allocation - $20,000) 12 (Design and Contingencies - $150,000) 13 (25) North Manheim Township, Memorial 14 Drive Overpass, Bridge Removal 295,000 15 (Base Construction Allocation - 16 $250,000) 17 (Land Allocation - $20,000) 18 (Design and Contingencies - $25,000) 19 (26) Branch Township, T-564, Bridge over 20 Muddy Creek, Bridge Replacement 360,000 21 (Base Construction Allocation - 22 $250,000) 23 (Land Allocation - $10,000) 24 (Design and Contingencies - $100,000) 25 (27) Eldred Township, T-395, Bridge over 26 Little Mahantango Creek, Bridge 27 Replacement 362,000 28 (Base Construction Allocation - 29 $250,000) 30 (Land Allocation - $12,000) 19990S0504B0514 - 376 -
1 (Design and Contingencies - $100,000) 2 (28) Orwigsburg Borough, Ridge Road 3 Bridge, Bridge Replacement 154,000 4 (Base Construction Allocation - 5 $122,000) 6 (Design and Contingencies - $32,000) 7 (b) State Bridges 8 (1) SR 0054, SR 0054 over Mahanoy Creek, 9 Mahanoy Township, Bridge Replacement 1,005,000 10 (Base Construction Allocation - 11 $770,000) 12 (Design and Contingencies - $235,000) 13 (2) SR 0054, SR 0054 over Reading Blue 14 Mountain and Northern Railroad, Mahanoy 15 Township, Bridge Rehabilitation 650,000 16 (Base Construction Allocation - 17 $500,000) 18 (Design and Contingencies - $150,000) 19 (3) SR 0081, SR 0081 Southbound over 20 Swatara Creek, Pine Grove Township, 21 Bridge Rehabilitation 970,000 22 (Base Construction Allocation - 23 $745,000) 24 (Design and Contingencies - $225,000) 25 (4) SR 0081, SR 0081 Northbound over 26 Swatara Creek, Pine Grove Township, 27 Bridge Rehabilitation 970,000 28 (Base Construction Allocation - 29 $745,000) 30 (Design and Contingencies - $225,000) 19990S0504B0514 - 377 -
1 (5) SR 0081, SR 0081 Southbound over SR 2 0443 and Exit Ramp 3, Pine Grove 3 Township, Bridge Rehabilitation 715,000 4 (Base Construction Allocation - 5 $550,000) 6 (Design and Contingencies - $165,000) 7 (6) SR 0081, SR 0081 Northbound over SR 8 0443 and Exit Ramp 31, Pine Grove 9 Township, Bridge Rehabilitation 515,000 10 (Base Construction Allocation - 11 $390,000) 12 (Design and Contingencies - $125,000) 13 (7) SR 0081, I-81 Southbound over T-886, 14 Oak Grove Road, Pine Grove Township, 15 Bridge Rehabilitation 300,000 16 (Base Construction Allocation - 17 $200,000) 18 (Design and Contingencies - $100,000) 19 (8) SR 0081, I-81 Northbound over T-886, 20 Oak Grove Road, Pine Grove Township, 21 Bridge Rehabilitation 300,000 22 (Base Construction Allocation - 23 $200,000) 24 (Design and Contingencies - $100,000) 25 (9) SR 0061, Bridge over Mahannon Creek at 26 South Liberty Street, North Manheim 27 Township, Bridge Rehabilitation 265,000 28 (Base Construction Allocation - 29 $175,000) 30 (Design and Contingencies - $90,000) 19990S0504B0514 - 378 -
1 (10) SR 0895, SR 0895 over Lizard Creek, 2 Village of Snyders, West Penn Township, 3 Bridge Rehabilitation 290,000 4 (Base Construction Allocation - 5 $190,000) 6 (Design and Contingencies - $100,000) 7 (11) SR 0901, SR 0901 over Mahanoy Creek, 8 Bridge Rehabilitation 680,000 9 (Base Construction Allocation - 10 $520,000) 11 (Design and Contingencies - $160,000) 12 (12) SR 1011, SR 1011 over Big Creek, 13 Village of Brockton, Schuylkill 14 Township, Bridge Replacement 340,000 15 (Base Construction Allocation - 16 $160,000) 17 (Land Allocation - $55,000) 18 (Design and Contingencies - $125,000) 19 (13) SR 1011, SR 1011 over Locust Creek, 20 Ryan Township, Bridge Rehabilitation 365,000 21 (Base Construction Allocation - 22 $180,000) 23 (Land Allocation - $60,000) 24 (Design and Contingencies - $125,000) 25 (14) SR 2018, SR 2018 over Little 26 Schuylkill River, Drehersville, East 27 Brunswick Township, Bridge 28 Rehabilitation 385,000 29 (Base Construction Allocation - 30 $285,000) 19990S0504B0514 - 379 -
1 (Design and Contingencies - $100,000) 2 (15) SR 4013, SR 4013 over Rausch Creek, 3 Hegins Township, Bridge Rehabilitation 280,000 4 (Base Construction Allocation - 5 $180,000) 6 (Design and Contingencies - $100,000) 7 (16) SR 4022, SR 4022 over Tributary of 8 Mahantango Creek, Eldred Township, 9 Bridge Replacement 310,000 10 (Base Construction Allocation - 11 $150,000) 12 (Land Allocation - $50,000) 13 (Design and Contingencies - $110,000) 14 (17) SR 0209, Broad Street over Little 15 Schuylkill River, Tamaqua Borough, 16 Bridge Replacement 600,000 17 (Base Construction Allocation - 18 $360,000) 19 (Land Allocation - $100,000) 20 (Design and Contingencies - $140,000) 21 (18) SR 4022, Broad Street Bridge over 22 Panther Creek, Tamaqua Borough, Bridge 23 Replacement 1,780,000 24 (Base Construction Allocation - 25 $1,220,000) 26 (Land Allocation - $195,000) 27 (Design and Contingencies - $365,000) 28 (19) SR 4022, SR 4022 over Mahanoy Creek, 29 Village of Helfenstein, Eldred 30 Township, Bridge Replacement 1,170,000 19990S0504B0514 - 380 -
1 (Base Construction Allocation - 2 $750,000) 3 (Land Allocation - $195,000) 4 (Design and Contingencies - $225,000) 5 (20) SR 0339, SR 0339 over Catawissa 6 Creek, North Union Township, Bridge 7 Replacement 984,000 8 (Base Construction Allocation - 9 $630,000) 10 (Land Allocation - $165,000) 11 (Design and Contingencies - $189,000) 12 (21) SR 0443, Dock Street Bridge over 13 Tributary of Schuylkill River, Borough 14 of Schuylkill Haven, Bridge 15 Replacement 325,000 16 (Base Construction Allocation - 17 $150,000) 18 (Land Allocation - $50,000) 19 (Design and Contingencies - $125,000) 20 (22) SR 0895, SR 0895 over Schuylkill 21 River, Bridge Replacement 2,370,000 22 (Base Construction Allocation - 23 $1,480,000) 24 (Land Allocation - $390,000) 25 (Design and Contingencies - $500,000) 26 (23) SR 4011, SR 4011 over Pine Creek, 27 Hegins Township, Bridge Replacement 720,000 28 (Base Construction Allocation - 29 $450,000) 30 (Land Allocation - $120,000) 19990S0504B0514 - 381 -
1 (Design and Contingencies - $150,000) 2 (24) SR 0895, Auburn Arch over Schuylkill 3 River, South Manheim Township, Bridge 4 Replacement 550,000 5 (Base Construction Allocation - 6 $350,000) 7 (Land Allocation - $50,000) 8 (Design and Contingencies - $150,000) 9 (25) SR 0061, Mady's Big Bridge over 10 Conrail, City of Pottsville, Bridge 11 Rehabilitation 1,323,000 12 (Base Construction Allocation - 13 $1,202,000) 14 (Design and Contingencies - $121,000) 15 (26) SR 0061, Mady's Small Bridge over 16 Schuylkill River, City of Pottsville, 17 Bridge Rehabilitation 329,000 18 (Base Construction Allocation - 19 $299,000) 20 (Design and Contingencies - $30,000) 21 (27) SR 0125, Pitman Bridge over Little 22 Mahantango Creek, Eldred Township, 23 Bridge Replacement 480,000 24 (Base Construction Allocation - 25 $390,000) 26 (Land Allocation - $10,000) 27 (Design and Contingencies - $80,000) 28 (28) SR 0325, Bridge over Wiconisco Creek, 29 Porter Township, Bridge Replacement 1,175,000 30 (Base Construction Allocation - 19990S0504B0514 - 382 -
1 $800,000) 2 (Land Allocation - $40,000) 3 (Design and Contingencies - $335,000) 4 (29) SR 0501, Bridge over Little Swatara 5 Creek, Pine Grove Township, Bridge 6 Replacement 1,400,000 7 (Base Construction Allocation - 8 $1,000,000) 9 (Land Allocation - $50,000) 10 (Design and Contingencies - $350,000) 11 (30) SR 0501, Small Bridge over Little 12 Swatara Creek, Pine Grove Township, 13 Bridge Replacement 250,000 14 (Base Construction Allocation - 15 $150,000) 16 (Land Allocation - $10,000) 17 (Design and Contingencies - $90,000) 18 (31) SR 1013, Tuscarora Park Bridge over 19 Tributary of Locust Creek, Ryan 20 Township, Bridge Deck Replacement 485,000 21 (Base Construction Allocation - 22 $375,000) 23 (Land Allocation - $10,000) 24 (Design and Contingencies - $100,000) 25 (32) SR 1016, Lofty Bridge over Pocono 26 N.E. Railroad, Delano Township, Bridge 27 Replacement 715,000 28 (Base Construction Allocation - 29 $500,000) 30 (Land Allocation - $15,000) 19990S0504B0514 - 383 -
1 (Design and Contingencies - $200,000) 2 (33) SR 2006, Bridge over Mahannon Creek, 3 West Brunswick Township, Bridge 4 Replacement 107,000 5 (Base Construction Allocation - 6 $92,000) 7 (Land Allocation - $5,000) 8 (Design and Contingencies - $10,000) 9 (34) SR 3003, Bridge over West Branch 10 Schuylkill River, North Manheim 11 Township, Bridge Deck Replacement 224,000 12 (Base Construction Allocation - 13 $195,000) 14 (Design and Contingencies - $29,000) 15 (35) SR 3015, Bridge over Wiconisco Creek, 16 Porter Township, Bridge Replacement 200,000 17 (Base Construction Allocation - 18 $175,000) 19 (Land Allocation - $8,000) 20 (Design and Contingencies - $17,000) 21 (36) SR 4016, Bridge over Little 22 Mahantango Creek, Upper Mahantongo 23 Township, Bridge Replacement 165,000 24 (Base Construction Allocation - 25 $150,000) 26 (Design and Contingencies - $15,000) 27 (37) SR 4033, Bridge over Tomhicken Creek, 28 North Union Township, Bridge Deck 29 Replacement 350,000 30 (Base Construction Allocation - 19990S0504B0514 - 384 -
1 $250,000) 2 (Design and Contingencies - $100,000) 3 (38) SR 4036, Ringtown Bridge over Little 4 Catawissa Creek, Union Township, Bridge 5 Replacement 240,000 6 (Base Construction Allocation - 7 $216,000) 8 (Land Allocation - $3,000) 9 (Design and Contingencies - $21,000) 10 (39) SR 4039, Haas Bridge over Mahantango 11 Creek, Upper Mahantongo Township, 12 Bridge Replacement 153,000 13 (Base Construction Allocation - 14 $130,000) 15 (Land Allocation - $10,000) 16 (Design and Contingencies - $13,000) 17 (40) SR 0081, I-81 Bridges over SR 3013, 18 Tremont Township, Bridge Deck 19 Rehabilitation 1,900,000 20 (Base Construction Allocation - 21 $1,850,000) 22 (Design and Contingencies - $50,000) 23 Section 59. Snyder County. 24 (a) Local Bridges (Reserved) 25 (b) State Bridges 26 (1) SR 1011, Pine Street Bridge over Penns 27 Creek, Selinsgrove, Bridge Painting 1,150,000 28 (Base Construction Allocation - 29 $940,000) 30 (Land Allocation - $10,000) 19990S0504B0514 - 385 -
1 (Design and Contingencies - $200,000) 2 (2) SR 3002, Bridge over Mahantango Creek, 3 1.5 Miles South of Meiserville, Perry 4 and Chapman Townships Line, Bridge 5 Rehabilitation 1,425,000 6 (Base Construction Allocation - 7 $1,211,000) 8 (Design and Contingencies - $214,000) 9 (3) SR 4007, Middle Creek Bridge over 10 Middle Creek, North of SR 0522 and 11 South of SR 4012, Beaver Township, 12 Bridge Replacement 1,158,000 13 (Base Construction Allocation - 14 $926,000) 15 (Land Allocation - $58,000) 16 (Design and Contingencies - $174,000) 17 (4) SR 0522, Bridge over Middle Creek, 18 Bridge Painting 180,000 19 (Base Construction Allocation - 20 $170,000) 21 (Design and Contingencies - $10,000) 22 (5) SR 0035, SR 0035 over Tributary of 23 Mahantango Creek, Perry Township, 24 Bridge Replacement 815,000 25 (Base Construction Allocation - 26 $652,000) 27 (Land Allocation - $41,000) 28 (Design and Contingencies - $122,000) 29 (6) SR 0104, SR 0104 over Branch of 30 Mahantango Creek, Perry Township, 19990S0504B0514 - 386 -
1 Bridge Replacement 430,000 2 (Base Construction Allocation - 3 $345,000) 4 (Land Allocation - $20,000) 5 (Design and Contingencies - $65,000) 6 (7) SR 0104, SR 0104 over Middle Creek, 7 Franklin Township, Bridge Replacement 440,000 8 (Base Construction Allocation - 9 $350,000) 10 (Land Allocation - $20,000) 11 (Design and Contingencies - $70,000) 12 (8) SR 0522, SR 0522 over Tributary of 13 Middle Creek, Spring Township, Bridge 14 Replacement 500,000 15 (Base Construction Allocation - 16 $400,000) 17 (Land Allocation - $25,000) 18 (Design and Contingencies - $75,000) 19 (9) SR 0522, SR 0522 over Tributary of 20 Middle Creek, Spring Township, Bridge 21 Replacement 896,000 22 (Base Construction Allocation - 23 $717,000) 24 (Land Allocation - $45,000) 25 (Design and Contingencies - $134,000) 26 (10) SR 0522, SR 0522 over Tributary of 27 Middle Creek, Beavertown Borough, 28 Bridge Replacement 244,000 29 (Base Construction Allocation - 30 $195,000) 19990S0504B0514 - 387 -
1 (Land Allocation - $12,000) 2 (Design and Contingencies - $37,000) 3 (11) SR 0522, SR 0522 over Tributary of 4 Middle Creek, Beavertown Borough, 5 Bridge Replacement 245,000 6 (Base Construction Allocation - 7 $196,000) 8 (Land Allocation - $12,000) 9 (Design and Contingencies - $37,000) 10 (12) SR 0522, SR 0522 over Kern Run, 11 Beavertown Borough, Bridge Replacement 570,000 12 (Base Construction Allocation - 13 $456,000) 14 (Land Allocation - $29,000) 15 (Design and Contingencies - $85,000) 16 (13) SR 0522, SR 0522 over Penns Creek, 17 Selinsgrove Borough, Bridge 18 Replacement 3,167,000 19 (Base Construction Allocation - 20 $2,534,000) 21 (Land Allocation - $158,000) 22 (Design and Contingencies - $475,000) 23 (14) SR 1011, SR 1011 over Tributary of 24 Penns Creek, Jackson Township, Bridge 25 Replacement 300,000 26 (Base Construction Allocation - 27 $190,000) 28 (Land Allocation - $30,000) 29 (Design and Contingencies - $80,000) 30 (15) SR 2013, SR 2013 over Tributary of 19990S0504B0514 - 388 -
1 Susquehanna River, Chapman Township, 2 Bridge Replacement 300,000 3 (Base Construction Allocation - 4 $190,000) 5 (Land Allocation - $30,000) 6 (Design and Contingencies - $80,000) 7 (16) SR 3009, SR 3009 over Paxtonville 8 Creek, Franklin Township, Bridge 9 Replacement 1,512,000 10 (Base Construction Allocation - 11 $1,209,000) 12 (Land Allocation - $76,000) 13 (Design and Contingencies - $227,000) 14 (17) SR 1011, Pine Street Bridge over 15 Penns Creek, Selinsgrove Borough, 16 Bridge Replacement 3,100,000 17 (Base Construction Allocation - 18 $2,500,000) 19 (Land Allocation - $160,000) 20 (Design and Contingencies - $450,000) 21 (18) SR 3009, Bridge over Middle Creek, 22 Franklin Township, Bridge Painting 155,000 23 (Base Construction Allocation - 24 $140,000) 25 (Design and Contingencies - $15,000) 26 (19) SR 0522, Middle Creek Bridge No.2, 27 Beavertown Borough, Bridge Replacement 400,000 28 (Base Construction Allocation - 29 $250,000) 30 (Land Allocation - $50,00) 19990S0504B0514 - 389 -
1 (Design and Contingencies - $100,000) 2 (20) SR 0104, Bridge over Mahantango 3 Creek, Perry Township, Bridge 4 Replacement 430,000 5 (Base Construction Allocation - 6 $345,000) 7 (Land Allocation - $20,000) 8 (Design and Contingencies - $65,000) 9 (21) SR 1013, Bridge over Penns Creek, 10 Jackson Township, Bridge 11 Rehabilitation 2,200,000 12 (Base Construction Allocation - 13 $1,700,000) 14 (Land Allocation - $100,000) 15 (Design and Contingencies - $400,000) 16 (22) SR 0235, Bridge over Tributary of 17 Branch of Beaver Creek, Spring 18 Township, Bridge Replacement 565,000 19 (Base Construction Allocation - 20 $452,000) 21 (Land Allocation - $28,000) 22 (Design and Contingencies - $85,000) 23 (23) SR 1016, Bridge over Penns Creek, 24 Jackson Township, Bridge Replacement 1,700,000 25 (Base Construction Allocation - 26 $1,400,000) 27 (Land Allocation - $40,000) 28 (Design and Contingencies - $260,000) 29 Section 60. Somerset County. 30 (a) Local Bridges 19990S0504B0514 - 390 -
1 (1) Middlecreek Township, T-338, Blue Hole 2 Creek Bridge over Blue Hole Creek, 3 Bridge Replacement 505,000 4 (Base Construction Allocation - 5 $400,000) 6 (Land Allocation - $10,000) 7 (Design and Contingencies - $95,000) 8 (2) Paint Borough, Pennsylvania Railroad 9 Bridge over Bedford Street, Bridge 10 Replacement 350,000 11 (Base Construction Allocation - 12 $250,000) 13 (Land Allocation - $25,000) 14 (Design and Contingencies - $75,000) 15 (3) Shade Township, T-712, Lipinski Road 16 Bridge over Dark Shade Creek, Bridge 17 Replacement 560,000 18 (Base Construction Allocation - 19 $450,000) 20 (Land Allocation - $10,000) 21 (Design and Contingencies - $100,000) 22 (4) Somerset Borough, Church Street Bridge 23 over Parsons Run, Bridge Replacement 350,000 24 (Base Construction Allocation - 25 $250,000) 26 (Land Allocation - $25,000) 27 (Design and Contingencies - $75,000) 28 (5) Windber Borough, South 22nd Street 29 Bridge over Seese Run, Bridge 30 Replacement 350,000 19990S0504B0514 - 391 -
1 (Base Construction Allocation - 2 $250,000) 3 (Land Allocation - $25,000) 4 (Design and Contingencies - $75,000) 5 (6) Windber Borough, 24th Street Bridge 6 over Seese Run, Bridge Replacement 350,000 7 (Base Construction Allocation - 8 $250,000) 9 (Land Allocation - $25,000) 10 (Design and Contingencies - $75,000) 11 (7) Windber Borough, Village Street Bridge 12 over Seese Run, Bridge Replacement 350,000 13 (Base Construction Allocation - 14 $250,000) 15 (Land Allocation - $25,000) 16 (Design and Contingencies - $75,000) 17 (8) Summit Township, Keystone Viaduct over 18 SR 2006, CSX Mainline and Flaugherty 19 Creek, Bridge Rehabilitation 715,000 20 (Base Construction Allocation - 21 $663,000) 22 (Design and Contingencies - $52,000) 23 (b) State Bridges 24 (1) SR 0160, SR 0160 over Tributary of 25 Boones Run, Stoney Creek Township, 26 Bridge Replacement 580,000 27 (Base Construction Allocation - 28 $430,000) 29 (Land Allocation - $25,000) 30 (Design and Contingencies - $125,000) 19990S0504B0514 - 392 -
1 (2) SR 0523, SR 0523 over Whites Creek, 2 Addison Township, Bridge Replacement 690,000 3 (Base Construction Allocation - 4 $510,000) 5 (Land Allocation - $50,000) 6 (Design and Contingencies - $130,000) 7 (3) SR 1007, SR 1007 over Lambert Run, 8 Stoney Creek Township, Bridge 9 Replacement 490,000 10 (Base Construction Allocation - 11 $355,000) 12 (Land Allocation - $25,000) 13 (Design and Contingencies - $110,000) 14 (4) SR 1017, SR 1017 over Breastwork Run, 15 Allegheny Township, Bridge Replacement 650,000 16 (Base Construction Allocation - 17 $490,000) 18 (Land Allocation - $25,000) 19 (Design and Contingencies - $135,000) 20 (5) SR 1017, SR 1017 over Breastwork Run, 21 Allegheny Township, Bridge Replacement 580,000 22 (Base Construction Allocation - 23 $440,000) 24 (Land Allocation - $25,000) 25 (Design and Contingencies - $135,000) 26 (6) SR 1018, SR 1018 over Beaverdam Run, 27 Shade Township, Bridge Replacement 545,000 28 (Base Construction Allocation - 29 $400,000) 30 (Land Allocation - $25,000) 19990S0504B0514 - 393 -
1 (Design and Contingencies - $120,000) 2 (7) SR 1018, SR 1018 over Beaverdam Run, 3 Shade Township, Bridge Replacement 515,000 4 (Base Construction Allocation - 5 $375,000) 6 (Land Allocation - $25,000) 7 (Design and Contingencies - $115,000) 8 (8) SR 2005, SR 2005 over Elk Lick Creek, 9 Elk Lick Township, Bridge Replacement 520,000 10 (Base Construction Allocation - 11 $380,000) 12 (Land Allocation - $25,000) 13 (Design and Contingencies - $115,000) 14 (9) SR 4013, SR 4013 over North Branch of 15 Quemahoning Creek, Lincoln Township, 16 Bridge Replacement 585,000 17 (Base Construction Allocation - 18 $435,000) 19 (Land Allocation - $25,000) 20 (Design and Contingencies - $125,000) 21 (10) SR 4019, SR 4019 over Quemahoning 22 Creek, Quemahoning Township, Bridge 23 Replacement 800,000 24 (Base Construction Allocation - 25 $625,000) 26 (Land Allocation - $25,000) 27 (Design and Contingencies - $150,000) 28 (11) SR 3039, SR 3039 over Allen Creek, 29 Middlecreek Township, Bridge 30 Replacement 200,000 19990S0504B0514 - 394 -
1 (Base Construction Allocation - 2 $150,000) 3 (Land Allocation - $5,000) 4 (Design and Contingencies - $45,000) 5 (12) SR 3039, SR 3039 over Allen Creek, 6 Middlecreek Township, Bridge 7 Replacement 220,000 8 (Base Construction Allocation - 9 $150,000) 10 (Land Allocation - $10,000) 11 (Design and Contingencies - $60,000) 12 (13) SR 4001, SR 4001 over Clear Run, 13 Jefferson Township, Bridge Replacement 295,000 14 (Base Construction Allocation - 15 $200,000) 16 (Land Allocation - $10,000) 17 (Design and Contingencies - $85,000) 18 (14) SR 3039, Allen Creek Bridge No.3 over 19 Allen Creek, Middlecreek Township, 20 Bridge Replacement 425,000 21 (Base Construction Allocation - 22 $300,000) 23 (Land Allocation - $25,000) 24 (Design and Contingencies - $100,000) 25 (15) SR 4006, Quemahoning Creek Bridge 26 over Quemahoning Creek, Jenner 27 Township, Bridge Replacement 625,000 28 (Base Construction Allocation - 29 $425,000) 30 (Land Allocation - $75,000) 19990S0504B0514 - 395 -
1 (Design and Contingencies - $125,000) 2 (16) SR 4026, Coxes Creek Bridge over East 3 Branch Coxes Creek, Somerset Borough, 4 Bridge Replacement 835,000 5 (Base Construction Allocation - 6 $610,000) 7 (Land Allocation - $75,000) 8 (Design and Contingencies - $150,000) 9 (17) SR 4016, Bens Creek Bridge over South 10 Fork Bens Creek, Conemaugh Township, 11 Bridge Replacement 700,000 12 (Base Construction Allocation - 13 $515,000) 14 (Land Allocation - $50,000) 15 (Design and Contingencies - $135,000) 16 Section 61. Sullivan County. 17 (a) Local Bridges 18 (1) Forks Township, T-448, Old TR 87 19 Bridge, County Bridge No.55 over Little 20 Loyalsock Creek, Bridge Replacement 860,000 21 (Base Construction Allocation - 22 $700,000) 23 (Land Allocation - $10,000) 24 (Design and Contingencies - $150,000) 25 (2) Forks and Laporte Townships, T-346 26 over Loyalsock Creek, Bridge 27 Replacement 840,000 28 (Base Construction Allocation - 29 $730,000) 30 (Land Allocation - $10,000) 19990S0504B0514 - 396 -
1 (Design and Contingencies - $100,000) 2 (b) State Bridges 3 (1) SR 0087, SR 0087 over Lick Run, Forks 4 Township, Bridge Replacement 635,000 5 (Base Construction Allocation - 6 $508,000) 7 (Land Allocation - $32,000) 8 (Design and Contingencies - $95,000) 9 (2) SR 0087, SR 0087 over Little Loyalsock 10 Creek, Cherry Township, Bridge 11 Replacement 655,000 12 (Base Construction Allocation - 13 $524,000) 14 (Land Allocation - $33,000) 15 (Design and Contingencies - $98,000) 16 (3) SR 0154, SR 0154 over Black Water Run, 17 Elkland Township, Bridge Replacement 194,000 18 (Base Construction Allocation - 19 $166,000) 20 (Design and Contingencies - $28,000) 21 (4) SR 0154, SR 0154 over Kings Creek, 22 Elkland Township, Bridge Replacement 404,000 23 (Base Construction Allocation - 24 $323,000) 25 (Land Allocation - $20,000) 26 (Design and Contingencies - $61,000) 27 (5) SR 1012, SR 1012 over Little Loyalsock 28 Creek, Cherry Township, Bridge 29 Replacement 260,000 30 (Base Construction Allocation - 19990S0504B0514 - 397 -
1 $208,000) 2 (Land Allocation - $13,000) 3 (Design and Contingencies - $39,000) 4 (6) SR 0154, Lincoln Falls Bridge over Elk 5 Creek, Elkland Township, Bridge 6 Replacement 1,750,000 7 (Base Construction Allocation - 8 $1,500,000) 9 (Land Allocation - $100,000) 10 (Design and Contingencies - $150,000) 11 (7) SR 0154, Hoagland Branch Bridge over 12 Hoagland Branch, Fox Township, Bridge 13 Replacement 539,000 14 (Base Construction Allocation - 15 $300,000) 16 (Land Allocation - $19,000) 17 (Design and Contingencies - $220,000) 18 Section 62. Susquehanna County. 19 (a) Local Bridges (Reserved) 20 (b) State Bridges 21 (1) SR 0167, Owego Street Bridge over 22 Branch of Fall Brook, Bridgewater 23 Township, Bridge Replacement 413,000 24 (Base Construction Allocation - 25 $342,000) 26 (Land Allocation - $10,000) 27 (Design and Contingencies - $61,000) 28 (2) SR 1016, Salt Lick Creek Bridge over 29 Branch of Salt Lick Creek, New Milford 30 Township, Bridge Replacement 100,000 19990S0504B0514 - 398 -
1 (Base Construction Allocation - 2 $86,000) 3 (Land Allocation - $3,000) 4 (Design and Contingencies - $11,000) 5 (3) SR 0081, Bridge over Trowbridge Creek, 6 1 Mile South of the Pennsylvania and 7 New York State Line, Great Bend 8 Township, Bridge Replacement 890,000 9 (Base Construction Allocation - 10 $700,000) 11 (Land Allocation - $10,000) 12 (Design and Contingencies - $180,000) 13 (4) SR 1017, Gulf Street Bridge, 0.5 Mile 14 North of SR 1015, Lanesboro Borough, 15 Bridge Replacement 305,000 16 (Base Construction Allocation - 17 $220,000) 18 (Land Allocation - $10,000) 19 (Design and Contingencies - $75,000) 20 (5) SR 3003, Bridge over Transue Creek, 21 1.5 Miles South of SR 3005, Auburn 22 Township, Bridge Painting 60,000 23 (Base Construction Allocation - 24 $50,000) 25 (Design and Contingencies - $10,000) 26 (6) SR 3006, Bridge over White Creek, 1.5 27 Miles West of SR 3004, Springville 28 Township, Bridge Painting 70,000 29 (Base Construction Allocation - 30 $60,000) 19990S0504B0514 - 399 -
1 (Design and Contingencies - $10,000) 2 (7) SR 0011, Bridge over Salt Lick Creek, 3 0.6 Mile North of TR 492, New Milford 4 Borough, Bridge Replacement 660,000 5 (Base Construction Allocation - 6 $510,000) 7 (Land Allocation - $20,000) 8 (Design and Contingencies - $130,000) 9 (8) SR 0367, Bridge over Tuscarora Creek, 10 North of SR 3005, Auburn Township, 11 Bridge Replacement 330,000 12 (Base Construction Allocation - 13 $265,000) 14 (Land Allocation - $10,000) 15 (Design and Contingencies - $65,000) 16 (9) SR 1010, Bridge over Bedbug Creek, 17 West of SR 1021, Oakland Township, 18 Bridge Replacement 325,000 19 (Base Construction Allocation - 20 $250,000) 21 (Land Allocation - $10,000) 22 (Design and Contingencies - $65,000) 23 (10) SR 1010, Bridge over Tributary of 24 Susquehanna River, 2 Miles West of SR 25 1021, Great Bend Township, Bridge 26 Replacement 288,000 27 (Base Construction Allocation - 28 $220,000) 29 (Land Allocation - $10,000) 30 (Design and Contingencies - $58,000) 19990S0504B0514 - 400 -
1 (11) SR 2046, Bridge over Branch of 2 Tunkhannock Creek, East of TR 92, 3 Gibson Township, Bridge Replacement 513,000 4 (Base Construction Allocation - 5 $400,000) 6 (Land Allocation - $10,000) 7 (Design and Contingencies - $103,000) 8 (12) SR 3017, Bridge over Thomas Creek, 9 Southeast of TR 29, Springville 10 Township, Bridge Replacement 285,000 11 (Base Construction Allocation - 12 $220,000) 13 (Land Allocation - $10,000) 14 (Design and Contingencies - $50,000) 15 (13) State Bridges, Countywide Bridge Zone 16 Painting, Bridge Painting 370,000 17 (Base Construction Allocation - 18 $350,000) 19 (Land Allocation - $10,000) 20 (Design and Contingencies - $10,000) 21 (14) SR 0858, Branch of Apolacon Creek, 22 0.3 Mile North of SR 4013, Apolacon 23 Township, Bridge Replacement 220,000 24 (Base Construction Allocation - 25 $180,000) 26 (Land Allocation - $10,000) 27 (Design and Contingencies - $30,000) 28 (15) SR 1010, SR 1010 over Tributary of 29 Susquehanna River, Great Bend Township, 30 Bridge Replacement 230,000 19990S0504B0514 - 401 -
1 (Base Construction Allocation - 2 $190,000) 3 (Land Allocation - $10,000) 4 (Design and Contingencies - $30,000) 5 (16) SR 1010, SR 1010 over Bedbug Creek, 6 Oakland Township, Bridge Replacement 270,000 7 (Base Construction Allocation - 8 $220,000) 9 (Land Allocation - $10,000) 10 (Design and Contingencies - $40,000) 11 (17) SR 2046, SR 2046 over Tunkhannock 12 Creek, Gibson Township, Bridge 13 Replacement 440,000 14 (Base Construction Allocation - 15 $370,000) 16 (Land Allocation - $10,000) 17 (Design and Contingencies - $60,000) 18 (18) SR 1011, Bridge over Hemlock Creek, 19 0.2 Mile North of SR 1009, Harmony 20 Township, Bridge Replacement 330,000 21 (Base Construction Allocation - 22 $280,000) 23 (Land Allocation - $10,000) 24 (Design and Contingencies - $40,000) 25 (19) SR 4002, Bridge over Choconut Creek, 26 0.1 Mile East of TR 267, Choconut 27 Township, Bridge Replacement 290,000 28 (Base Construction Allocation - 29 $240,000) 30 (Land Allocation - $10,000) 19990S0504B0514 - 402 -
1 (Design and Contingencies - $40,000) 2 (20) SR 3009, Bridge over White Creek, 1.8 3 Miles North of County Line, Auburn 4 Township, Bridge Replacement 240,000 5 (Base Construction Allocation - 6 $200,000) 7 (Land Allocation - $10,000) 8 (Design and Contingencies - $30,000) 9 (21) SR 3023, Bridge over East Branch of 10 Wyalusing Creek, 0.1 Mile South of TR 11 706, Rush Township, Bridge Replacement 12 and Intersection Realignment 1,520,000 13 (Base Construction Allocation - 14 $1,300,000) 15 (Land Allocation - $20,000) 16 (Design and Contingencies - $200,000) 17 (22) SR 4008, Bridge over Laurel Lake 18 Creek, 1.7 Miles East of TR 167, Silver 19 Lake Township, Bridge Replacement 430,000 20 (Base Construction Allocation - 21 $360,000) 22 (Land Allocation - $10,000) 23 (Design and Contingencies - $60,000) 24 Section 63. Tioga County. 25 (a) Local Bridges 26 (1) Elkland Borough, North Buffalo Street 27 over Camp Brook Creek, Bridge 28 Replacement 510,000 29 (Base Construction Allocation) - 30 $360,000) 19990S0504B0514 - 403 -
1 (Land Allocation - $20,000) 2 (Design and Contingencies - $130,000) 3 (2) Middlebury Township, T-658 (Monkey Run 4 Road), Bridge over Tributary of Losey 5 Creek, Bridge Replacement 390,000 6 (Base Construction Allocation - 7 $250,000) 8 (Land Allocation - $10,000) 9 (Design and Contingencies - $130,000) 10 (3) Farmington Township, T-758 (Short Hole 11 Road), Bridge over Thorn Bottom Creek, 12 Bridge Replacement 390,000 13 (Base Construction Allocation - 14 $250,000) 15 (Land Allocation - $10,000) 16 (Design and Contingencies - $130,000) 17 (4) Tioga Township, T-726, Upper Bear 18 Creek Road Bridge over Crooked Creek, 19 Bridge Replacement 1,550,000 20 (Base Construction Allocation - 21 $1,250,000) 22 (Design and Contingencies - $300,000) 23 (b) State Bridges 24 (1) SR 0249, Losey Creek Bridge, South of 25 SR 4017 in Village of Keeneyville, 26 Middlebury Township, Bridge 27 Rehabilitation 250,000 28 (Base Construction Allocation - 29 $210,000) 30 (Land Allocation - $5,000) 19990S0504B0514 - 404 -
1 (Design and Contingencies - $35,000) 2 (2) SR 1002, Corey Creek Bridge over Corey 3 Creek, Northeast of Mansfield, Bridge 4 Replacement 346,000 5 (Base Construction Allocation - 6 $277,000) 7 (Land Allocation - $17,000) 8 (Design and Contingencies - $52,000) 9 (3) SR 3001, Kettle Creek Bridge, 11 Miles 10 South of Watrous, Bridge Replacement 366,000 11 (Base Construction Allocation - 12 $293,000) 13 (Land Allocation - $18,000) 14 (Design and Contingencies - $55,000) 15 (4) SR 3023, Heise Run North Bridge, West 16 of Wellsboro, Bridge Replacement 240,000 17 (Base Construction Allocation - 18 $192,000) 19 (Land Allocation - $12,000) 20 (Design and Contingencies - $36,000) 21 (5) SR 4017, Holden Creek Bridge No.1, 22 Bridge Replacement 584,000 23 (Base Construction Allocation - 24 $467,000) 25 (Land Allocation - $29,000) 26 (Design and Contingencies - $88,000) 27 (6) SR 4024, Elkhorn Creek Bridge, West of 28 Tioga Borough, Bridge Replacement 451,000 29 (Base Construction Allocation - 30 $401,000) 19990S0504B0514 - 405 -
1 (Land Allocation - $15,000) 2 (Design and Contingencies - $35,000) 3 (7) SR 3007, Bridge over Stoney Fork 4 Creek, Bridge Painting 160,000 5 (Base Construction Allocation - 6 $150,000) 7 (Design and Contingencies - $10,000) 8 (8) SR 4017, Bridge over Cowanesque River, 9 Bridge Painting 475,000 10 (Base Construction Allocation - 11 $465,000) 12 (Design and Contingencies - $10,000) 13 (9) SR 0049, SR 0049 over Cowanesque 14 River, Westfield Township, Bridge 15 Replacement 1,802,000 16 (Base Construction Allocation - 17 $1,442,000) 18 (Land Allocation - $90,000) 19 (Design and Contingencies - $270,000) 20 (10) SR 0287, SR 0287 over Wellsboro 21 Street - Conrail, Tioga Township, 22 Bridge Replacement 1,709,000 23 (Base Construction Allocation - 24 $1,367,000) 25 (Land Allocation - $86,000) 26 (Design and Contingencies - $256,000) 27 (11) SR 0328, SR 0328 over Hammond Creek, 28 Jackson Township, Bridge Replacement 256,000 29 (Base Construction Allocation - 30 $205,000) 19990S0504B0514 - 406 -
1 (Land Allocation - $13,000) 2 (Design and Contingencies - $38,000) 3 (12) SR 0349, SR 0349 over Mill Creek, 4 Clymer Township, Bridge Replacement 1,000,000 5 (Base Construction Allocation - 6 $800,000) 7 (Land Allocation - $50,000) 8 (Design and Contingencies - $150,000) 9 (13) SR 1030, SR 1030 over Conrail, Tioga 10 Township, Bridge Replacement 561,000 11 (Base Construction Allocation - 12 $449,000) 13 (Land Allocation - $28,000) 14 (Design and Contingencies - $84,000) 15 (14) SR 2017, SR 2017 over Mill Creek, 16 Union Township, Bridge Replacement 584,000 17 (Base Construction Allocation - 18 $467,000) 19 (Land Allocation - $27,000) 20 (Design and Contingencies - $88,000) 21 (15) SR 4017, SR 4017 Bridge No.2 over 22 Holden Creek, Osceola Township, Bridge 23 Replacement 542,000 24 (Base Construction Allocation - 25 $434,000) 26 (Land Allocation - $27,000) 27 (Design and Contingencies - $81,000) 28 (16) SR 0015, Mill Creek Bridge spanning 29 Tioga Dam Impoundment at Confluence, 30 Two-Lane Bridge Construction 6,875,000 19990S0504B0514 - 407 -
1 (Base Construction Allocation - 2 $6,250,000) 3 (Design and Contingencies - $625,000) 4 (17) PA 249, Bridge over Crooked Creek, 5 Village of Little Marsh, Chatham 6 Township, Bridge Replacement 1,250,000 7 (Base Construction Allocation - 8 $1,000,000) 9 (Land Allocation - $50,000) 10 (Design and Contingencies - $200,000) 11 (18) SR 1032, Crooked Creek Bridge over 12 Crooked Creek, Tioga Township, Bridge 13 Replacement 1,550,000 14 (Base Construction Allocation - 15 $1,250,000) 16 (Land Allocation - $50,000) 17 (Design and Contingencies - $250,000) 18 Section 64. Union County. 19 (a) Local Bridges (Reserved) 20 (b) State Bridges 21 (1) SR 0192, Rapid Run Bridge II over 22 Rapid Run, Lewis Township, Bridge 23 Rehabilitation 250,000 24 (Base Construction Allocation - 25 $200,000) 26 (Land Allocation - $13,000) 27 (Design and Contingencies - $37,000) 28 (2) SR 0192, Rapid Run Bridge I over Rapid 29 Run, Lewis Township, Bridge 30 Rehabilitation 205,000 19990S0504B0514 - 408 -
1 (Base Construction Allocation - 2 $164,000) 3 (Land Allocation - $10,000) 4 (Design and Contingencies - $31,000) 5 (3) SR 0044, Bridge over Spring Creek, 6 Gregg Township, Bridge Painting 110,000 7 (Base Construction Allocation - 8 $100,000) 9 (Design and Contingencies - $10,000) 10 (4) SR 1004, Bridge over Little Buffalo 11 Creek, Kelly Township, Bridge Painting 75,000 12 (Base Construction Allocation - 13 $65,000) 14 (Design and Contingencies - $10,000) 15 (5) SR 1012, Bridge over White Deer Hole 16 Creek, Gregg Township, Bridge Painting 160,000 17 (Base Construction Allocation - 18 $150,000) 19 (Design and Contingencies - $10,000) 20 (6) SR 0235, SR 0235 over Laurel Run, 21 Hartley Township, Bridge Replacement 1,118,000 22 (Base Construction Allocation - 23 $894,000) 24 (Land Allocation - $56,000) 25 (Design and Contingencies - $168,000) 26 (7) SR 0235, SR 0235 over Buffalo Creek, 27 Lewis Township, Bridge Replacement 395,000 28 (Base Construction Allocation - 29 $316,000) 30 (Land Allocation - $20,000) 19990S0504B0514 - 409 -
1 (Design and Contingencies - $59,000) 2 (8) US 15, Bridge over White Deer Hole 3 Creek, Village of Allenwood, Gregg 4 Township, Deck Replacement 1,850,000 5 (Base Construction Allocation - 6 $1,500,000) 7 (Land Allocation - $50,000) 8 (Design and Contingencies - $300,000) 9 (9) US 15, Bridge over SR 1004, Village of 10 West Milton, Kelly Township, 11 Superstructure Replacement 2,450,000 12 (Base Construction Allocation - 13 $2,000,000) 14 (Land Allocation - $50,000) 15 (Design and Contingencies - $400,000) 16 (10) US 15, Bridge over White Deer Creek, 17 White Deer Township, Deck Replacement 2,430,000 18 (Base Construction Allocation - 19 $2,000,000) 20 (Land Allocation - $30,000) 21 (Design and Contingencies - $400,000) 22 (11) US 15, Bridge over SR 1010, White 23 Deer Township, Deck Replacement 1,230,000 24 (Base Construction Allocation - 25 $1,000,000) 26 (Land Allocation - $30,000) 27 (Design and Contingencies - $200,000) 28 (12) SR 3003, Bridge over Buffalo Creek, 29 Lewis Township, Bridge Replacement 450,000 30 (Base Construction Allocation - 19990S0504B0514 - 410 -
1 $350,000) 2 (Land Allocation - $20,000) 3 (Design and Contingencies - $80,000) 4 (13) SR 3004, Bridge over Laurel Run, 5 Hartley Township, Bridge Replacement 723,000 6 (Base Construction Allocation - 7 $578,000) 8 (Land Allocation - $36,000) 9 (Design and Contingencies - $109,000) 10 (14) SR 3004, Bridge over Cedar Run, 11 Limestone Township, Bridge Replacement 380,000 12 (Base Construction Allocation - 13 $280,000) 14 (Land Allocation - $20,000) 15 (Design and Contingencies - $80,000) 16 (15) SR 3003, Eighth Street Bridge, 17 Mifflinburg Borough, Bridge 18 Replacement 630,000 19 (Base Construction Allocation - 20 $504,000) 21 (Land Allocation - $32,000) 22 (Design and Contingencies - $94,000) 23 (16) SR 0192, Rapid Run Bridge III over 24 Rapid Run, Hartley Township, Bridge 25 Replacement 660,000 26 (Base Construction Allocation - 27 $528,000) 28 (Land Allocation - $33,000) 29 (Design and Contingencies - $99,000) 30 Section 65. Venango County. 19990S0504B0514 - 411 -
1 (a) Local Bridges 2 (1) Richland Township, T-552 over Mill 3 Creek, Bridge Replacement 475,000 4 (Base Construction Allocation - 5 $355,000) 6 (Land Allocation - $10,000) 7 (Design and Contingencies - $110,000) 8 (2) Richland Township, T-361 over unnamed 9 tributary of Mill Creek, Bridge 10 Replacement 360,000 11 (Base Construction Allocation - 12 $265,000) 13 (Land Allocation - $10,000) 14 (Design and Contingencies - $85,000) 15 (3) Richland Township, T-377 over Sage 16 Run, Bridge Replacement 385,000 17 (Base Construction Allocation - 18 $290,000) 19 (Land Allocation - $10,000) 20 (Design and Contingencies - $85,000) 21 (4) Pinegrove Township, T-628 over East 22 Sandy Creek, Bridge Replacement 363,000 23 (Base Construction Allocation - 24 $307,000) 25 (Land Allocation - $6,000) 26 (Design and Contingencies - $50,000) 27 (5) Cranberry Township, T-679 over Branch 28 of Sage Run, Bridge Replacement 106,000 29 (Base Construction Allocation - 30 $100,000) 19990S0504B0514 - 412 -
1 (Land Allocation - $1,000) 2 (Design and Contingencies - $5,000) 3 (6) Oakland Township, T-567 over Branch of 4 Two Mile Run, Bridge Replacement 106,000 5 (Base Construction Allocation - 6 $100,000) 7 (Land Allocation - $1,000) 8 (Design and Contingencies - $5,000) 9 (7) Rockland Township, T-512 over East 10 Sandy Creek, Bridge Replacement 360,000 11 (Base Construction Allocation - 12 $300,000) 13 (Land Allocation - $10,000) 14 (Design and Contingencies - $50,000) 15 (8) Pinegrove Township, T-628 over East 16 Sandy Creek, Bridge Replacement 510,000 17 (Base Construction Allocation - 18 $400,000) 19 (Land Allocation - $10,000) 20 (Design and Contingencies - $100,000) 21 (9) Cherrytree Township, T-520, Baker Road 22 Bridge over Prather Creek, Bridge 23 Replacement 360,000 24 (10) Cherrytree Township, T-649, Fairview 25 Road Bridge over Branch of Prather 26 Creek, Bridge Replacement 360,000 27 (b) State Bridges 28 (1) SR 4001, SR 4001 over Two Mile Run 29 West Branch, Sugarcreek Borough, Bridge 30 Replacement 205,000 19990S0504B0514 - 413 -
1 (Base Construction Allocation - 2 $150,000) 3 (Land Allocation - $5,000) 4 (Design and Contingencies - $50,000) 5 (2) SR 0227, SR 0227 over Cherry Run, 6 Cornplanter Township, Bridge 7 Replacement 280,000 8 (Base Construction Allocation - 9 $200,000) 10 (Land Allocation - $20,000) 11 (Design and Contingencies - $60,000) 12 (3) SR 0322, SR 0322 over Halls Run, 13 Cranberry Township, Bridge Replacement 2,600,000 14 (Base Construction Allocation - 15 $2,000,000) 16 (Land Allocation - $100,000) 17 (Design and Contingencies - $500,000) 18 (4) SR 3009, SR 3009 over I-80, Scrubgrass 19 Township, Bridge Replacement 810,000 20 (Base Construction Allocation - 21 $700,000) 22 (Land Allocation - $10,000) 23 (Design and Contingencies - $100,000) 24 (5) SR 3017, SR 3017 over Warden Run, 25 Canal Township, Bridge Replacement 920,000 26 (Base Construction Allocation - 27 $800,000) 28 (Land Allocation - $20,000) 29 (Design and Contingencies - $100,000) 30 (6) SR 0038, SR 0038 over Pine Run, 19990S0504B0514 - 414 -
1 Richland Township, Bridge 2 Rehabilitation 110,000 3 (Base Construction Allocation - 4 $100,000) 5 (Design and Contingencies - $10,000) 6 (7) SR 3025, SR 3025 over Hays Run, City 7 of Oil City, Bridge Replacement 340,000 8 (Base Construction Allocation - 9 $300,000) 10 (Land Allocation - $5,000) 11 (Design and Contingencies - $35,000) 12 (8) SR 0062, Washington Crossing Bridge 13 over French Creek and Conrail, City of 14 Franklin, Bridge Painting 920,000 15 (Base Construction Allocation - 16 $800,000) 17 (Land Allocation - $40,000) 18 (Design and Contingencies - $80,000) 19 (9) SR 0062, Sage Run Bridge No.4 over 20 Sage Run, Cranberry Township, Bridge 21 Replacement 660,000 22 (Base Construction Allocation - 23 $560,000) 24 (Land Allocation - $20,000) 25 (Design and Contingencies - $80,000) 26 (10) SR 0062, Sage Run Bridge No.7 over 27 Sage Run, Cranberry Township, Bridge 28 Replacement 330,000 29 (Base Construction Allocation - 30 $250,000) 19990S0504B0514 - 415 -
1 (Land Allocation - $20,000) 2 (Design and Contingencies - $60,000) 3 (11) SR 0322, 13th Street Bridge over 4 French Creek, City of Franklin, Bridge 5 Rehabilitation 1,620,000 6 (Base Construction Allocation - 7 $1,500,000) 8 (Land Allocation - $40,000) 9 (Design and Contingencies - $80,000) 10 (12) SR 1004, Pithole Stone Arch Bridge 11 over Pithole Creek, Cornplanter 12 Township, Bridge Rehabilitation 400,000 13 (Base Construction Allocation - 14 $280,000) 15 (Land Allocation - $20,000) 16 (Design and Contingencies - $100,000) 17 (13) SR 4010, Twin Bridge over Sugar 18 Creek, Sugarcreek Borough, Bridge 19 Replacement 1,050,000 20 (Base Construction Allocation - 21 $900,000) 22 (Land Allocation - $50,000) 23 (Design and Contingencies - $100,000) 24 Section 66. Warren County. 25 (a) Local Bridges (Reserved) 26 (b) State Bridges 27 (1) SR 0006, SR 0006 over Wintroth Run, 28 Brokenstraw Township, Bridge 29 Replacement 260,000 30 (Base Construction Allocation - 19990S0504B0514 - 416 -
1 $180,000) 2 (Land Allocation - $20,000) 3 (Design and Contingencies - $60,000) 4 (2) SR 0006, SR 0006 over Six Mile Run, 5 Mead Township, Bridge Replacement 320,000 6 (Base Construction Allocation - 7 $250,000) 8 (Land Allocation - $10,000) 9 (Design and Contingencies - $60,000) 10 (3) SR 0027, SR 0027 over Pine Creek, 11 Southwest Township, Bridge Replacement 800,000 12 (Base Construction Allocation - 13 $580,000) 14 (Land Allocation - $20,000) 15 (Design and Contingencies - $200,000) 16 (4) SR 0027, SR 0027 over Hazeltine Hollow 17 Run, Brokenstraw Township, Bridge 18 Replacement 310,000 19 (Base Construction Allocation - 20 $210,000) 21 (Land Allocation - $20,000) 22 (Design and Contingencies - $80,000) 23 (5) SR 0062, SR 0062 over Bully Run, 24 Watson Township, Bridge Replacement 300,000 25 (Base Construction Allocation - 26 $230,000) 27 (Land Allocation - $20,000) 28 (Design and Contingencies - $50,000) 29 (6) SR 0957, SR 0957 over Little 30 Brokenstraw Creek, Freehold Township, 19990S0504B0514 - 417 -
1 Bridge Replacement 800,000 2 (Base Construction Allocation - 3 $620,000) 4 (Land Allocation - $20,000) 5 (Design and Contingencies - $160,000) 6 (7) SR 3009, SR 3009 over Tidioute Creek, 7 Deerfield Township, Bridge Replacement 470,000 8 (Base Construction Allocation - 9 $400,000) 10 (Land Allocation - $10,000) 11 (Design and Contingencies - $60,000) 12 (8) SR 4013, SR 4013 over Mathews Run, 13 Youngsville Borough, Bridge 14 Replacement 430,000 15 (Base Construction Allocation - 16 $360,000) 17 (Land Allocation - $10,000) 18 (Design and Contingencies - $60,000) 19 (9) SR 4021, SR 4021 over Brands Run, 20 Sugar Grove Borough, Bridge 21 Replacement 240,000 22 (Base Construction Allocation - 23 $180,000) 24 (Land Allocation - $20,000) 25 (Design and Contingencies - $40,000) 26 (10) SR 0027, Bridge over Hazeltine Hollow 27 Run, Brokenstraw Township, Bridge 28 Replacement 500,000 29 (Base Construction Allocation - 30 $450,000) 19990S0504B0514 - 418 -
1 (Design and Contingencies - $50,000) 2 (11) SR 0062, US 62, Bridge over Bully 3 Run, Watson Township, Bridge 4 Replacement 410,000 5 (Base Construction Allocation - 6 $370,000) 7 (Design and Contingencies - $40,000) 8 (12) SR 3009, Tidioute Creek Road Bridge 9 No.5 over Tidioute Creek, Triumph 10 Township, Bridge Replacement 290,000 11 (Base Construction Allocation - 12 $270,000) 13 (Design and Contingencies - $20,000) 14 (13) SR 0027, Pittsfield Truss Bridge over 15 Little Brokenstraw, Pittsfield 16 Township, Bridge Replacement 1,040,000 17 (Base Construction Allocation - 18 $900,000) 19 (Land Allocation - $40,000) 20 (Design and Contingencies - $100,000) 21 (14) SR 3009, Tidioute Creek Road Bridge 22 No.5 over Tidioute Creek, Triumph 23 Township, Bridge Replacement 300,000 24 (Base Construction Allocation - 25 $270,000) 26 (Land Allocation - $10,000) 27 (Design and Contingencies - $20,000) 28 Section 67. Washington County. 29 (a) Local Bridges 30 (1) Burgettstown Borough, Raccoon Bridge 19990S0504B0514 - 419 -
1 No.23 over Raccoon Creek, Bridge 2 Rehabilitation 433,000 3 (Base Construction Allocation - 4 $313,000) 5 (Land Allocation - $20,000) 6 (Design and Contingencies - $100,000) 7 (2) Chartiers Township, Allison Hollow 8 Road, One-Lane Bridge, Bridge 9 Replacement 195,000 10 (Base Construction Allocation - 11 $150,000) 12 (Land Allocation - $5,000) 13 (Design and Contingencies - $40,000) 14 (3) Chartiers Township, Allison Hollow 15 Road, One-Lane Bridge, Bridge 16 Replacement 195,000 17 (Base Construction Allocation - 18 $150,000) 19 (Land Allocation - $5,000) 20 (Design and Contingencies - $40,000) 21 (4) Chartiers Township, McGovern Road 22 Bridge, Bridge Replacement 145,000 23 (Base Construction Allocation - 24 $100,000) 25 (Land Allocation - $5,000) 26 (Design and Contingencies - $40,000) 27 (5) North Strabane Township, T-643, Galley 28 Road Bridge over Little Chartiers 29 Creek, Bridge Replacement 570,000 30 (Base Construction Allocation - 19990S0504B0514 - 420 -
1 $450,000) 2 (Land Allocation - $20,000) 3 (Design and Contingencies - $100,000) 4 (6) Donegal Township, T-541, Lindsay 5 Bridge over Buck Run, Bridge 6 Replacement 285,000 7 (Base Construction Allocation - 8 $255,000) 9 (Design and Contingencies - $30,000) 10 (7) Donegal Township, T-423, Mays Bridge 11 over Middle Wheeling Creek, Bridge 12 Replacement 245,000 13 (Base Construction Allocation - 14 $215,000) 15 (Design and Contingencies - $30,000) 16 (8) Independence Township, T-649, Cummins 17 Bridge over Sugar Camp Run, Bridge 18 Replacement 330,000 19 (Base Construction Allocation - 20 $300,000) 21 (Design and Contingencies - $30,000) 22 (9) Mount Pleasant Township, T-749, Sabo 23 Road over Westland Run, Bridge 24 Replacement 25,000 25 (Base Construction Allocation - 26 $20,000) 27 (Design and Contingencies - $5,000) 28 (10) Mount Pleasant Township, T-606, 29 Primrose Road over Millers Run, Bridge 30 Replacement 25,000 19990S0504B0514 - 421 -
1 (Base Construction Allocation - 2 $20,000) 3 (Design and Contingencies - $5,000) 4 (11) Mount Pleasant Township, T-493, 5 Meriage Street over Robinson Run 6 Tributary, Bridge Replacement 25,000 7 (Base Construction Allocation - 8 $20,000) 9 (Design and Contingencies - $5,000) 10 (12) North Bethlehem Township, T-445, 11 Dague Bridge over Pigeon Creek, Bridge 12 Replacement 250,000 13 (Base Construction Allocation - 14 $220,000) 15 (Design and Contingencies - $30,000) 16 (13) North Franklin Township, T-526, Cario 17 Drive over Unnamed Tributary of Catfish 18 Creek, Bridge Replacement 46,000 19 (Base Construction Allocation - 20 $42,000) 21 (Design and Contingencies - $4,000) 22 (14) Nottingham Township, T-782, Sundust 23 Road Culvert, 35 Feet North of 24 Intersection with SR 1059, Bridge 25 Replacement 101,000 26 (Base Construction Allocation - 27 $91,000) 28 (Design and Contingencies - $10,000) 29 (15) Nottingham Township, T-828, Barr 30 Bridge over Mingo Creek, Bridge 19990S0504B0514 - 422 -
1 Replacement 350,000 2 (Base Construction Allocation - 3 $310,000) 4 (Design and Contingencies - $40,000) 5 (16) Robinson Township, T-500, Chamberlain 6 Bridge over Chamberlain Run, Bridge 7 Replacement 285,000 8 (Base Construction Allocation - 9 $255,000) 10 (Design and Contingencies - $30,000) 11 (17) Smith Township, T-843, Dunbar Bridge 12 over Raccoon Creek, Bridge Replacement 285,000 13 (Base Construction Allocation - 14 $255,000) 15 (Design and Contingencies - $30,000) 16 (18) City of Washington, Hanna Street 17 Bridge over Catfish Creek, Bridge 18 Replacement 40,000 19 (Base Construction Allocation - 20 $30,000) 21 (Design and Contingencies - $10,000) 22 (19) City of Washington, Rosewood Avenue 23 Bridge over Catfish Creek, Bridge 24 Replacement 40,000 25 (Base Construction Allocation - 26 $30,000) 27 (Design and Contingencies - $10,000) 28 (20) West Pike Run Township, T-840, Suzy 29 Lane over Pike Run Creek, Bridge 30 Replacement 230,000 19990S0504B0514 - 423 -
1 (Base Construction Allocation - 2 $210,000) 3 (Design and Contingencies - $20,000) 4 (21) California Borough, Daisytown Bridge 5 over Pike Run, Bridge Replacement 925,000 6 (Base Construction Allocation - 7 $700,000) 8 (Land Allocation - $50,000) 9 (Design and Contingencies - $175,000) 10 (22) Coal Center Borough, Water Street 11 Bridge over Pike Run, Bridge 12 Replacement 1,588,000 13 (Base Construction Allocation - 14 $1,288,000) 15 (Land Allocation - $50,000) 16 (Design and Contingencies - $250,000) 17 (23) West Pike Run Township, T-948 over 18 Pike Run, Bridge Replacement 1,075,000 19 (Base Construction Allocation - 20 $850,000) 21 (Land Allocation - $50,0000) 22 (Design and Contingencies - $175,000) 23 (24) Midway Borough, North Avenue over 24 Robinson Run Creek, Bridge Replacement 95,000 25 (Base Construction Allocation - 26 $55,000) 27 (Land Allocation - $20,000) 28 (Design and Contingencies - $20,000) 29 (25) Canonsburg Borough, Adams Street over 30 Brush Run, Bridge Replacement 176,000 19990S0504B0514 - 424 -
1 (Base Construction Allocation - 2 $150,000) 3 (Land Allocation - $1,000) 4 (Design and Contingencies - $25,000) 5 (26) East Finley Township, T-375, County 6 Bridge No. 32 over Templeton Fork, 7 Bridge Replacement 355,000 8 (Base Construction Allocation - 9 $300,000) 10 (Land Allocation - $5,000) 11 (Design and Contingencies - $50,000) 12 (27) North Franklin Township, Construct 13 New Bridges Along New Local Road 14 Connecting SR 3013 and SR 0018, New 15 Bridge Construction 1,168,000 16 (Base Construction Allocation - 17 $928,000) 18 (Land Allocation - $100,000) 19 (Design and Contingencies - $140,000) 20 (b) State Bridges 21 (1) SR 0018, Bridge over Abandoned 22 Railroad, City of Washington, Bridge 23 Replacement 650,000 24 (Base Construction Allocation - 25 $500,000) 26 (Land Allocation - $25,000) 27 (Design and Contingencies - $125,000) 28 (2) SR 0019, Bridge over Chartiers Creek, 29 North Strabane and Peters Townships, 30 Bridge Painting 161,000 19990S0504B0514 - 425 -
1 (Base Construction Allocation - 2 $156,000) 3 (Design and Contingencies - $5,000) 4 (3) SR 0070, I-70 Westbound Bridge over SR 5 3009, Buffalo Township, Bridge 6 Painting 148,000 7 (Base Construction Allocation - 8 $143,000) 9 (Design and Contingencies - $5,000) 10 (4) SR 0070, I-70 Eastbound Bridge over SR 11 3009, Buffalo Township, Bridge 12 Painting 163,000 13 (Base Construction Allocation - 14 $158,000) 15 (Design and Contingencies - $5,000) 16 (5) SR 0070, I-70 Bridge over 8th Street, 17 Donegal Township, Bridge Replacement 2,486,000 18 (Base Construction Allocation - 19 $2,211,000) 20 (Land Allocation - $25,000) 21 (Design and Contingencies - $250,000) 22 (6) SR 0070, I-70 Bridge over Turnback 23 Road, South Strabane Township, Bridge 24 Rehabilitation 990,000 25 (Base Construction Allocation - 26 $750,000) 27 (Land Allocation - $40,000) 28 (Design and Contingencies - $200,000) 29 (7) SR 0070, I-70 Bridge over SR 0519, 30 Somerset Township, Bridge 19990S0504B0514 - 426 -
1 Rehabilitation 2,000,000 2 (Base Construction Allocation - 3 $1,720,000) 4 (Land Allocation - $40,000) 5 (Design and Contingencies - $240,000) 6 (8) SR 0070, I-70 Bridge over SR 2017, 7 Somerset Township, Bridge 8 Rehabilitation 1,105,000 9 (Base Construction Allocation - 10 $865,000) 11 (Land Allocation - $40,000) 12 (Design and Contingencies - $200,000) 13 (9) SR 0088, Charleroi Bridge over Maple 14 Creek, Charleroi and Speers Boroughs, 15 Bridge Replacement 725,000 16 (Base Construction Allocation - 17 $500,000) 18 (Land Allocation - $25,000) 19 (Design and Contingencies - $200,000) 20 (10) SR 0088, Bridge over Peters Creek, 21 Finleyville Borough, Bridge Painting 65,000 22 (Base Construction Allocation - 23 $65,000) 24 (11) SR 0917, Pigeon Creek Bridge over 25 Branch of Pigeon Creek, Bentleyville 26 Borough, Bridge Replacement 570,000 27 (Base Construction Allocation - 28 $370,000) 29 (Land Allocation - $25,000) 30 (Design and Contingencies - $175,000) 19990S0504B0514 - 427 -
1 (12) SR 1005, Bridge over Millers Run, 2 Cecil Township, Bridge Painting 75,000 3 (Base Construction Allocation - 4 $75,000) 5 (13) SR 1022, Donora Webster Bridge over 6 Monongahela River and Conrail, Donora 7 Borough, Bridge Replacement 20,000,000 8 (Base Construction Allocation - 9 $15,000,000) 10 (Land Allocation - $3,000,000) 11 (Design and Contingencies - $2,000,000) 12 (14) SR 1077, Donora-Monessen Bridge over 13 Monongahela River, PA 837 and 906 and 14 Railroad, Donora Borough, Bridge 15 Painting 1,000,000 16 (Base Construction Allocation - 17 $1,000,000) 18 (15) SR 2005, Sowers Run Bridge over 19 Sowers Run, Amwell Township, Bridge 20 Replacement 435,000 21 (Base Construction Allocation - 22 $235,000) 23 (Land Allocation - $25,000) 24 (Design and Contingencies - $175,000) 25 (16) SR 2011, Bridge over Branch of Little 26 Tenmile Creek, West Bethlehem Township, 27 Bridge Replacement 460,000 28 (Base Construction Allocation - 29 $260,000) 30 (Land Allocation - $25,000) 19990S0504B0514 - 428 -
1 (Design and Contingencies - $175,000) 2 (17) SR 2030, Gorby's Bridge II over Gorby 3 Run, California Borough, Bridge 4 Rehabilitation 300,000 5 (Base Construction Allocation - 6 $300,000) 7 (18) SR 2037, Maple Creek Bridge over 8 Branch of Maple Creek, Fallowfield 9 Township, Bridge Replacement 486,000 10 (Base Construction Allocation - 11 $286,000) 12 (Land Allocation - $25,000) 13 (Design and Contingencies - $175,000) 14 (19) SR 3009, Buffalo Arch Bridge over 15 Branch of Buffalo Creek and Railroad, 16 Buffalo Township, Bridge Replacement 535,000 17 (Base Construction Allocation - 18 $300,000) 19 (Land Allocation - $10,000) 20 (Design and Contingencies - $225,000) 21 (20) SR 4015, Bridge over Cherry Run, 22 Mount Pleasant Township, Bridge 23 Painting 53,000 24 (Base Construction Allocation - 25 $51,000) 26 (Design and Contingencies - $2,000) 27 (21) SR 4022, Chartiers Creek Bridge No.2 28 over Branch of Chartiers Creek, Canton 29 Township, Bridge Replacement 415,000 30 (Base Construction Allocation - 19990S0504B0514 - 429 -
1 $215,000) 2 (Land Allocation - $25,000) 3 (Design and Contingencies - $175,000) 4 (22) SR 4022, Chartiers Creek Bridge No.1 5 over Branch of Chartiers Creek, Canton 6 Township, Bridge Replacement 405,000 7 (Base Construction Allocation - 8 $205,000) 9 (Land Allocation - $25,000) 10 (Design and Contingencies - $175,000) 11 (23) SR 2034, SR 2034 over Branch of Pike 12 Run, West Pike Run Township, Bridge 13 Replacement 438,000 14 (Base Construction Allocation - 15 $313,000) 16 (Land Allocation - $25,000) 17 (Design and Contingencies - $100,000) 18 (24) SR 2079, SR 2079 over Pike Run, West 19 Pike Run Township, Bridge Replacement 988,000 20 (Base Construction Allocation - 21 $788,000) 22 (Land Allocation - $50,000) 23 (Design and Contingencies - $150,000) 24 (25) SR 2030, Bridge No.1 over Gorby Run, 25 California Borough, Bridge Replacement 430,000 26 (Base Construction Allocation - 27 $330,000) 28 (Design and Contingencies - $100,000) 29 (26) SR 1077, Donora-Monessen Bridge over 30 Monongahela River, Donora Borough, 19990S0504B0514 - 430 -
1 Bridge Rehabilitation 2,000,000 2 (Base Construction Allocation - 3 $1,980,000) 4 (Design and Contingencies - $20,000) 5 Section 68. Wayne County. 6 (a) Local Bridges 7 (1) Honesdale Borough, Old Willow Avenue, 8 Bridge over Corley Brook at 9 Intersection of TR 6, Bridge 10 Replacement 410,000 11 (Base Construction Allocation - 12 $350,000) 13 (Land Allocation - $10,000) 14 (Design and Contingencies - $50,000) 15 (b) State Bridges 16 (1) SR 0371, Cochecton Bridge No.6 over 17 Delaware River, Damascus Township, 18 Bridge Rehabilitation 1,050,000 19 (Base Construction Allocation - 20 $950,000) 21 (Design and Contingencies - $100,000) 22 (2) SR 0380, I-380 Bridge over Lehigh 23 River, Lehigh Township, Bridge 24 Rehabilitation 284,000 25 (Base Construction Allocation - 26 $244,000) 27 (Design and Contingencies - $40,000) 28 (3) SR 4009, Quarry Bridge over Dyberry 29 Creek, Dyberry Township, Bridge 30 Replacement 660,000 19990S0504B0514 - 431 -
1 (Base Construction Allocation - 2 $500,000) 3 (Land Allocation - $10,000) 4 (Design and Contingencies - $150,000) 5 (4) SR 0371, Bridge No.6, Damascus 6 Township, Bridge Painting 2,200,000 7 (Base Construction Allocation - 8 $2,000,000) 9 (Design and Contingencies - $200,000) 10 (5) SR 1020, Bridge No.7 over Delaware 11 River, Damascus Township, Bridge 12 Painting 3,300,000 13 (Base Construction Allocation - 14 $3,000,000) 15 (Design and Contingencies - $300,000) 16 (6) SR 1004, Bridge over Outlet of Beach 17 Lake, Intersection of SR 1011, Berlin 18 Township, Bridge Replacement 345,000 19 (Base Construction Allocation - 20 $265,000) 21 (Land Allocation - $10,000) 22 (Design and Contingencies - $70,000) 23 (7) SR 3028, Bridge over TR 191, East of 24 SR 3031, Cherry Ridge Township, Bridge 25 Replacement 450,000 26 (Base Construction Allocation - 27 $350,000) 28 (Land Allocation - $10,000) 29 (Design and Contingencies - $90,000) 30 (8) State Bridges, Countywide Bridge Zone 19990S0504B0514 - 432 -
1 Painting, Bridge Painting 370,000 2 (Base Construction Allocation - 3 $350,000) 4 (Land Allocation - $10,000) 5 (Design and Contingencies - $10,000) 6 (9) SR 1004, SR 1004 over Outlet of Beach 7 Lake, Berlin Township, Bridge 8 Replacement 260,000 9 (Base Construction Allocation - 10 $220,000) 11 (Land Allocation - $10,000) 12 (Design and Contingencies - $30,000) 13 (10) SR 3028, SR 3028 over TR 191, Cherry 14 Ridge Township, Bridge Replacement 400,000 15 (Base Construction Allocation - 16 $340,000) 17 (Land Allocation - $10,000) 18 (Design and Contingencies - $50,000) 19 (11) SR 0371, Bridge No.1 over Dyberry 20 Creek at Junction of SR 1023, Lebanon 21 Township, Bridge Replacement 400,000 22 (Base Construction Allocation - 23 $340,000) 24 (Land Allocation - $10,000) 25 (Design and Contingencies - $50,000) 26 (12) SR 0371, Bridge No.5 over Beaver Dam 27 Creek, 0.1 Mile West of SR 1031, 28 Damascus Township, Bridge Replacement 470,000 29 (Base Construction Allocation - 30 $400,000) 19990S0504B0514 - 433 -
1 (Land Allocation - $10,000) 2 (Design and Contingencies - $60,000) 3 (13) SR 3006, Bridge No.3 over Ariel 4 Creek, 0.6 Mile North of SR 3008, Salem 5 Township, Bridge Replacement 470,000 6 (Base Construction Allocation - 7 $400,000) 8 (Land Allocation - $10,000) 9 (Design and Contingencies - $60,000) 10 (14) SR 4014, Bridge No.4 over Balls 11 Creek, 0.5 Mile East of SR 4037, Scott 12 Township, Bridge Replacement 380,000 13 (Base Construction Allocation - 14 $320,000) 15 (Land Allocation - $10,000) 16 (Design and Contingencies - $50,000) 17 (15) SR 0348, Bridge over Jones Creek, 0.1 18 Mile West of SR 3019, Salem Township, 19 Bridge Replacement 470,000 20 (Base Construction Allocation - 21 $400,000) 22 (Land Allocation - $10,000) 23 (Design and Contingencies - $60,000) 24 (16) SR 4043, Bridge over Branch of Oquaga 25 Creek, 1.5 Miles West of SR 4037, Scott 26 Township, Bridge Replacement 240,000 27 (Base Construction Allocation - 28 $200,000) 29 (Land Allocation - $10,000) 30 (Design and Contingencies - $30,000) 19990S0504B0514 - 434 -
1 (17) SR 1007, Bridge over Branch of Boyd's 2 Creek, 0.5 Mile East of SR 1019, 3 Damascus Township, Bridge Replacement 310,000 4 (Base Construction Allocation - 5 $260,000) 6 (Land Allocation - $10,000) 7 (Design and Contingencies - $40,000) 8 (18) SR 0006, Lackawaxen River Bridge over 9 Lackawaxen River, Honesdale Borough, 10 Bridge Rehabilitation 260,000 11 (Base Construction Allocation - 12 $180,000) 13 (Design and Contingencies - $80,000) 14 Section 69. Westmoreland County. 15 (a) Local Bridges 16 (1) Hempfield Township, Airport Hill Road 17 Bridge over Slate Creek, Bridge 18 Replacement 350,000 19 (Base Construction Allocation - 20 $280,000) 21 (Land Allocation - $10,000) 22 (Design and Contingencies - $60,000) 23 (2) Hempfield Township, Sweitzer Road 24 Bridge over Sewickley Creek, Bridge 25 Replacement 975,000 26 (Base Construction Allocation - 27 $800,000) 28 (Land Allocation - $15,000) 29 (Design and Contingencies - $160,000) 30 (3) Hempfield Township, Ladysmith Road 19990S0504B0514 - 435 -
1 Bridge over Little Sewickley Creek, 2 Bridge Replacement 813,000 3 (Base Construction Allocation - 4 $613,000) 5 (Land Allocation - $50,000) 6 (Design and Contingencies - $150,000) 7 (4) Hempfield Township, Old Route 30 8 Bridge over Slate Creek, Bridge 9 Replacement 370,000 10 (Base Construction Allocation - 11 $300,000) 12 (Land Allocation - $10,000) 13 (Design and Contingencies - $60,000) 14 (5) Hempfield Township, Old Route 119 15 Bridge over Tributary of Jacks Run, 16 Bridge Replacement 428,000 17 (Base Construction Allocation - 18 $288,000) 19 (Land Allocation - $15,000) 20 (Design and Contingencies - $125,000) 21 (6) Jeanette City, 6th Street Bridge over 22 Brush Creek, Bridge Replacement 460,000 23 (Base Construction Allocation - 24 $340,000) 25 (Land Allocation - $20,000) 26 (Design and Contingencies - $100,000) 27 (7) Ligonier Township, T-605, Bridge over 28 Two Mile Run, Bridge Replacement 320,000 29 (Base Construction Allocation - 30 $200,000) 19990S0504B0514 - 436 -
1 (Land Allocation - $20,000) 2 (Design and Contingencies - $100,000) 3 (8) Ligonier Township, T-617, Bridge over 4 Mill Run, Bridge Replacement 310,000 5 (Base Construction Allocation - 6 $190,000) 7 (Land Allocation - $20,000) 8 (Design and Contingencies - $100,000) 9 (9) Hempfield Township, Possum Hollow Road 10 Bridge over Tributary of Little 11 Sewickley Creek, Bridge Replacement 428,000 12 (Base Construction Allocation - 13 $288,000) 14 (Land Allocation - $15,000) 15 (Design and Contingencies - $125,000) 16 (10) South Huntington Township, T-390, 17 Williams Road Bridge, Bridge 18 Replacement 125,000 19 (Base Construction Allocation - 20 $100,000) 21 (Land Allocation - $5,000) 22 (Design and Contingencies - $20,000) 23 (11) South Huntington Township, T-562, 24 J.D. Smith Road Bridge, Bridge 25 Replacement 155,000 26 (Base Construction Allocation - 27 $125,000) 28 (Land Allocation - $5,000) 29 (Design and Contingencies - $25,000) 30 (12) South Huntington Township, T-386, 19990S0504B0514 - 437 -
1 Bridge No. 1, Mount Etna Road Bridge, 2 Bridge Replacement 145,000 3 (Base Construction Allocation - 4 $115,000) 5 (Land Allocation - $5,000) 6 (Design and Contingencies - $25,000) 7 (13) South Huntington Township, T-386, 8 Bridge No.2, Mount Etna Road at Remo 9 Road, Bridge Replacement 135,000 10 (Base Construction Allocation - 11 $110,000) 12 (Land Allocation - $5,000) 13 (Design and Contingencies - $20,000) 14 (14) South Huntington Township, T-385, 15 Commer Road Bridge, Bridge Replacement 150,000 16 (Base Construction Allocation - 17 $120,000) 18 (Land Allocation - $5,000) 19 (Design and Contingencies - $25,000) 20 (15) Washington Township, T-979, Pleasant 21 View Road Bridge over Beaver Run, 22 Bridge Replacement 385,000 23 (Base Construction Allocation - 24 $265,000) 25 (Land Allocation - $20,000) 26 (Design and Contingencies - $100,000) 27 (16) Derry Township, T-924, Bridge over 28 Union Run, Bridge Replacement 578,000 29 (Base Construction Allocation - 30 $463,000) 19990S0504B0514 - 438 -
1 (Land Allocation - $15,000) 2 (Design and Contingencies - $100,000) 3 (17) Derry Township, T-937, Bridge over 4 Stony Run, Bridge Replacement 553,000 5 (Base Construction Allocation - 6 $438,000) 7 (Land Allocation - $15,000) 8 (Design and Contingencies - $100,000) 9 (18) Derry Township, T-941, Bridge over 10 Stony Run, Bridge Replacement 590,000 11 (Base Construction Allocation - 12 $475,000) 13 (Land Allocation - $15,000) 14 (Design and Contingencies - $100,000) 15 (19) Donegal Township, T-916, Bridge over 16 Indian Creek, Bridge Replacement 465,000 17 (Base Construction Allocation - 18 $350,000) 19 (Land Allocation - $15,000) 20 (Design and Contingencies - $100,000) 21 (20) Donegal Township, T-880, Bridge over 22 Four Mile Run, Bridge No.3, Bridge 23 Replacement 415,000 24 (Base Construction Allocation - 25 $300,000) 26 (Land Allocation - $15,000) 27 (Design and Contingencies - $100,000) 28 (21) Donegal Township, T-880, Bridge over 29 Four Mile Run, Bridge No.5, Bridge 30 Replacement 415,000 19990S0504B0514 - 439 -
1 (Base Construction Allocation - 2 $300,000) 3 (Land Allocation - $15,000) 4 (Design and Contingencies - $100,000) 5 (22) Fairfield Township, T-739, Berkey's 6 Bridge over Unnamed Tributary, Bridge 7 Replacement 200,000 8 (Base Construction Allocation - 9 $170,000) 10 (Land Allocation - $10,000) 11 (Design and Contingencies - $20,000) 12 (23) Fairfield Township, T-847, Bailey's 13 Bridge over Hendricks Run, Bridge 14 Replacement 200,000 15 (Base Construction Allocation - 16 $170,000) 17 (Land Allocation - $10,000) 18 (Design and Contingencies - $20,000) 19 (24) Fairfield Township, T-847, Toby 20 Bridge over Unnamed Tributary, Bridge 21 Replacement 200,000 22 (Base Construction Allocation - 23 $170,000) 24 (Land Allocation - $10,000) 25 (Design and Contingencies - $20,000) 26 (25) Fairfield Township, T-931, Patterson 27 Bridge No.1 over Bear Pond Run, Bridge 28 Replacement 200,000 29 (Base Construction Allocation - 30 $170,000) 19990S0504B0514 - 440 -
1 (Land Allocation - $10,000) 2 (Design and Contingencies - $20,000) 3 (26) Fairfield Township, T-984, Love 4 Hollow Bridge No.1 over Hendricks Run, 5 Bridge Replacement 200,000 6 (Base Construction Allocation - 7 $170,000) 8 (Land Allocation - $10,000) 9 (Design and Contingencies - $20,000) 10 (27) Fairfield Township, T-984, Love 11 Hollow Bridge No.2 over Hendricks Run, 12 Bridge Replacement 200,000 13 (Base Construction Allocation - 14 $170,000) 15 (Land Allocation - $10,000) 16 (Design and Contingencies - $20,000) 17 (28) Fairfield Township, T-988, Yeager 18 Hollow Bridge No.1 over Unnamed 19 Tributary, Bridge Replacement 200,000 20 (Base Construction Allocation - 21 $170,000) 22 (Land Allocation - $10,000) 23 (Design and Contingencies - $20,000) 24 (29) Fairfield Township, T-988, Yeager 25 Hollow Bridge No.2 over Unnamed 26 Tributary, Bridge Replacement 200,000 27 (Base Construction Allocation - 28 $170,000) 29 (Land Allocation - $10,000) 30 (Design and Contingencies - $20,000) 19990S0504B0514 - 441 -
1 (30) Fairfield Township, T-990, Patterson 2 Bridge No.2 over Unnamed Tributary, 3 Bridge Replacement 200,000 4 (Base Construction Allocation - 5 $170,000) 6 (Land Allocation - $10,000) 7 (Design and Contingencies - $20,000) 8 (31) Ligonier Township, T-505, Horner Hill 9 Road over Laughlintown Run, Bridge 10 Replacement 175,000 11 (Base Construction Allocation - 12 $125,000) 13 (Land Allocation - $15,000) 14 (Design and Contingencies - $35,000) 15 (32) Ligonier Township, T-607, Weller Road 16 over Unnamed Stream, Bridge 17 Replacement 10,000 18 (Base Construction Allocation - $8,000) 19 (Design and Contingencies - $2,000) 20 (33) Ligonier Township, T-617, Robb Road 21 over Hannas Run, Bridge Replacement 310,000 22 (Base Construction Allocation - 23 $250,000) 24 (Land Allocation - $10,000) 25 (Design and Contingencies - $50,000) 26 (34) Ligonier Township, T-719, Peoples 27 Road over Unnamed Stream, Bridge 28 Replacement 100,000 29 (Base Construction Allocation - 30 $75,000) 19990S0504B0514 - 442 -
1 (Land Allocation - $5,000) 2 (Design and Contingencies - $20,000) 3 (35) Ligonier Township, T-721, Bridge over 4 North Fork of Trout Run, Bridge 5 Replacement 200,000 6 (Base Construction Allocation - 7 $125,000) 8 (Land Allocation - $10,000) 9 (Design and Contingencies - $65,000) 10 (36) Ligonier Township, T-942, Zion Church 11 Road over Unnamed Stream, Bridge 12 Replacement 50,000 13 (Base Construction Allocation - 14 $35,000) 15 (Land Allocation - $5,000) 16 (Design and Contingencies - $10,000) 17 (37) Ligonier Township, T-984, Mill Road 18 over Mill Race, Bridge Replacement 50,000 19 (Base Construction Allocation - 20 $35,000) 21 (Land Allocation - $5,000) 22 (Design and Contingencies - $10,000) 23 (38) Ligonier Township, T-950, Old Lincoln 24 Highway East over Unnamed Stream, 25 Bridge Rehabilitation 25,000 26 (Base Construction Allocation - 27 $20,000) 28 (Design and Contingencies - $5,000) 29 (39) Ligonier Township, T-984, Harvey Road 30 over Macks Run, Bridge Rehabilitation 5,000 19990S0504B0514 - 443 -
1 (Base Construction Allocation - $4,000) 2 (Design and Contingencies - $1,000) 3 (40) Saint Clair Township, T-994, Bridge 4 over Tubmill Creek, Bridge Replacement 440,000 5 (Base Construction Allocation - 6 $325,000) 7 (Land Allocation - $15,000) 8 (Design and Contingencies - $100,000) 9 (41) Sewickley Township, T-318, Bridge 10 No.3 over Tributary of Youghiogheny 11 River, Bridge Replacement 100,000 12 (Base Construction Allocation - 13 $70,000) 14 (Land Allocation - $5,000) 15 (Design and Contingencies - $25,000) 16 (42) Derry Township, Conrail Overpass over 17 SR 0981, Bridge Replacement 1,600,000 18 (Base Construction Allocation - 19 $1,200,000) 20 (Land Allocation - $200,000) 21 (Design and Contingencies - $200,000) 22 (43) Hempfield Township, T-399 over Jacks 23 Run, Bridge Replacement 428,000 24 (Base Construction Allocation - 25 $288,000) 26 (Land Allocation - $15,000) 27 (Design and Contingencies - $125,000) 28 (44) Hempfield Township, T-550 over 29 Tributary to Little Sewickley Creek, 30 Bridge Replacement 428,000 19990S0504B0514 - 444 -
1 (Base Construction Allocation - 2 $288,000) 3 (Land Allocation - $15,000) 4 (Design and Contingencies - $125,000) 5 (45) Ligonier Township, T-984 over Mill 6 Creek, Bridge Replacement 650,000 7 (Base Construction Allocation - 8 $450,000) 9 (Land Allocation - $50,000) 10 (Design and Contingencies - $150,000) 11 (46) Salem Township, T-881, Bridge over 12 Loyalhanna Creek, Bridge Replacement 82,000 13 (Base Construction Allocation - 14 $67,000) 15 (Design and Contingencies - $15,000) 16 (47) Sewickley Township, T-633, Green 17 Hills Road Bridge over Little Sewickley 18 Creek, Bridge Replacement 465,000 19 (Base Construction Allocation - 20 $325,000) 21 (Land Allocation - $15,000) 22 (Design and Contingencies - $125,000) 23 (b) State Bridges 24 (1) SR 0030, Mill Creek Bridge over Mill 25 Creek, Ligonier Township, Bridge 26 Replacement 910,000 27 (Base Construction Allocation - 28 $710,000) 29 (Land Allocation - $25,000) 30 (Design and Contingencies - $175,000) 19990S0504B0514 - 445 -
1 (2) SR 0031, Jacobs Creek Bridge over 2 Jacobs Creek, Mount Pleasant and 3 Bullskin Townships, Bridge Replacement 715,000 4 (Base Construction Allocation - 5 $500,000) 6 (Land Allocation - $40,000) 7 (Design and Contingencies - $175,000) 8 (3) SR0056, Seward Bridge over Conrail and 9 Local Road, St. Clair Township, Bridge 10 Painting 600,000 11 (Base Construction Allocation - 12 $600,000) 13 (4) SR 0070, I-70 Bridge over N&W 14 Railroad, Rostraver Township, Bridge 15 Rehabilitation 1,565,000 16 (Base Construction Allocation - 17 $1,305,000) 18 (Land Allocation - $60,000) 19 (Design and Contingencies - $200,000) 20 (5) SR 0070, I-70 Bridge over Conrail, 21 South Huntington Township, Bridge 22 Rehabilitation 3,125,000 23 (Base Construction Allocation - 24 $2,780,000) 25 (Land Allocation - $45,000) 26 (Design and Contingencies - $300,000) 27 (6) SR 0119, Crabtree Creek Bridge No.2 28 over Crabtree Creek, Hempfield 29 Township, Bridge Replacement 577,000 30 (Base Construction Allocation - 19990S0504B0514 - 446 -
1 $377,000) 2 (Land Allocation - $25,000) 3 (Design and Contingencies - $175,000) 4 (7) SR 0136, West Newton Bridge over 5 Youghiogheny River, West Newton 6 Borough, Bridge Painting 250,000 7 (Base Construction Allocation - 8 $250,000) 9 (8) SR 0259, Boliver Underpass Conrail 10 Railroad over SR 0259, Fairfield 11 Township, Bridge Replacement 310,000 12 (Base Construction Allocation - 13 $200,000) 14 (Land Allocation - $10,000) 15 (Design and Contingencies - $100,000) 16 (9) SR 0271, Bridge over Mill Creek, 17 Ligonier Township, Bridge Painting 87,000 18 (Base Construction Allocation - 19 $87,000) 20 (10) SR 0711, Bridge over Mill Creek, 21 Ligonier Township, Bridge Painting 125,000 22 (Base Construction Allocation - 23 $125,000) 24 (11) SR 0819, Bridge over Stauffer Bridge, 25 Scottdale Borough, Bridge Painting 92,000 26 (Base Construction Allocation - 27 $92,000) 28 (12) SR 0981, Bridge over Branch of Barron 29 Run, South Huntington Township, Bridge 30 Replacement 250,000 19990S0504B0514 - 447 -
1 (Base Construction Allocation - 2 $250,000) 3 (13) SR 0982, Bradenville Bridge over 4 Saxman Run, Derry Township, Bridge 5 Replacement 330,000 6 (Base Construction Allocation - 7 $330,000) 8 (14) SR 1027, Stoney Run Bridge over 9 Stoney Run, Derry Township, Bridge 10 Replacement 340,000 11 (Base Construction Allocation - 12 $255,000) 13 (Land Allocation - $10,000) 14 (Design and Contingencies - $75,000) 15 (15) SR 2008, Fourmile Run Bridge over 16 Fourmile Run, Cook Township, Bridge 17 Painting 83,000 18 (Base Construction Allocation - 19 $83,000) 20 (16) SR 2010, Bridge over Branch of Boyer 21 Run, Mount Pleasant Township, Bridge 22 Replacement 450,000 23 (Base Construction Allocation - 24 $250,000) 25 (Land Allocation - $25,000) 26 (Design and Contingencies - $175,000) 27 (17) SR 8036, New Stanton Ramp Bridge over 28 SR 3091, New Stanton Borough, Bridge 29 Rehabilitation 475,000 30 (Base Construction Allocation - 19990S0504B0514 - 448 -
1 $395,000) 2 (Design and Contingencies - $80,000) 3 (18) SR 0030, SR 0030 over Mill Creek, 4 Ligonier Township, Bridge 5 Rehabilitation 200,000 6 (Base Construction Allocation - 7 $150,000) 8 (Design and Contingencies - $50,000) 9 (19) SR 0030, SR 0030 over Branch of 10 Loyalhanna Creek, Unity Township, 11 Bridge Replacement 245,000 12 (Base Construction Allocation - 13 $125,000) 14 (Land Allocation - $20,000) 15 (Design and Contingencies - $100,000) 16 (20) SR 0217, SR 0217 over Miller Run, 17 Derry Township, Bridge Replacement 293,000 18 (Base Construction Allocation - 19 $188,000) 20 (Land Allocation - $5,000) 21 (Design and Contingencies - $100,000) 22 (21) SR 0259, SR 0259 over Branch of 23 Freeman Run, Fairfield Township, Bridge 24 Replacement 218,000 25 (Base Construction Allocation - 26 $113,000) 27 (Land Allocation - $5,000) 28 (Design and Contingencies - $100,000) 29 (22) SR 0381, SR 0381 over Branch of 30 Loyalhanna Creek, Cook Township, Bridge 19990S0504B0514 - 449 -
1 Replacement 670,000 2 (Base Construction Allocation - 3 $450,000) 4 (Land Allocation - $20,000) 5 (Design and Contingencies - $200,000) 6 (23) SR 0381, SR 0381 over Camp Run, 7 Donegal Township, Bridge Replacement 608,000 8 (Base Construction Allocation - 9 $388,000) 10 (Land Allocation - $20,000) 11 (Design and Contingencies - $200,000) 12 (24) SR 0711, SR 0711 over Mill Creek, 13 Ligonier Township, Bridge Replacement 600,000 14 (Base Construction Allocation - 15 $450,000) 16 (Land Allocation - $50,000) 17 (Design and Contingencies - $100,000) 18 (25) SR 0982, SR 0982 over Jacobs Creek, 19 Mount Pleasant Township, Bridge 20 Replacement 938,000 21 (Base Construction Allocation - 22 $688,000) 23 (Land Allocation - $50,000) 24 (Design and Contingencies - $200,000) 25 (26) SR 0982, SR 0982 over Nine Mile Run, 26 Unity Township, Bridge Replacement 348,000 27 (Base Construction Allocation - 28 $238,000) 29 (Land Allocation - $10,000) 30 (Design and Contingencies - $100,000) 19990S0504B0514 - 450 -
1 (27) SR 0982, SR 0982 over Indian Camp 2 Run, Unity Township, Bridge 3 Replacement 335,000 4 (Base Construction Allocation - 5 $225,000) 6 (Land Allocation - $10,000) 7 (Design and Contingencies - $100,000) 8 (28) SR 1004, SR 1004 over Hendricks 9 Creek, Fairfield Township, Bridge 10 Replacement 200,000 11 (Base Construction Allocation - 12 $170,000) 13 (Land Allocation - $10,000) 14 (Design and Contingencies - $20,000) 15 (29) SR 1006, SR 1006 over Freeman Run, 16 Fairfield Township, Bridge Replacement 833,000 17 (Base Construction Allocation - 18 $613,000) 19 (Land Allocation - $20,000) 20 (Design and Contingencies - $200,000) 21 (30) SR 1006, West Bolivar Bridge near 22 Treasure Island, Fairfield Township, 23 Bridge Replacement 200,000 24 (Base Construction Allocation - 25 $170,000) 26 (Land Allocation - $10,000) 27 (Design and Contingencies - $20,000) 28 (31) SR 1007, SR 1007 over Tubmill Run, 29 Fairfield Township, Bridge Replacement 465,000 30 (Base Construction Allocation - 19990S0504B0514 - 451 -
1 $350,000) 2 (Land Allocation - $15,000) 3 (Design and Contingencies - $100,000) 4 (32) SR 1012, SR 1012 over Branch of Megee 5 Run, Derry Township, Bridge 6 Replacement 318,000 7 (Base Construction Allocation - 8 $213,000) 9 (Land Allocation - $5,000) 10 (Design and Contingencies - $100,000) 11 (33) SR 1014, SR 1014 over Abandoned 12 Railroad, Derry Township, Bridge 13 Replacement 268,000 14 (Base Construction Allocation - 15 $163,000) 16 (Land Allocation - $5,000) 17 (Design and Contingencies - $100,000) 18 (34) SR 1015, SR 1015 over Hypocrite 19 Creek, Fairfield Township, Bridge 20 Replacement 200,000 21 (Base Construction Allocation - 22 $170,000) 23 (Land Allocation - $10,000) 24 (Design and Contingencies - $20,000) 25 (35) SR 1027, SR 1027 over Branch of Stony 26 Run, Derry Township, Bridge 27 Replacement 305,000 28 (Base Construction Allocation - 29 $200,000) 30 (Land Allocation - $5,000) 19990S0504B0514 - 452 -
1 (Design and Contingencies - $100,000) 2 (36) SR 1031, SR 1031 over McCune Run, 3 Derry Township, Bridge Replacement 293,000 4 (Base Construction Allocation - 5 $188,000) 6 (Land Allocation - $5,000) 7 (Design and Contingencies - $100,000) 8 (37) SR 2006, SR 2006 over Branch of 9 Jacobs Creek, Mt. Pleasant Township, 10 Bridge Replacement 403,000 11 (Base Construction Allocation - 12 $288,000) 13 (Land Allocation - $15,000) 14 (Design and Contingencies - $100,000) 15 (38) SR 2007, SR 2007 over Shupe Run, Mt. 16 Pleasant Township, Bridge Replacement 218,000 17 (Base Construction Allocation - 18 $113,000) 19 (Land Allocation - $5,000) 20 (Design and Contingencies - $100,000) 21 (39) SR 2012, SR 2012 over Brinker Run, 22 Mt. Pleasant Township, Bridge 23 Replacement 415,000 24 (Base Construction Allocation - 25 $300,000) 26 (Land Allocation - $15,000) 27 (Design and Contingencies - $100,000) 28 (40) SR 2021, SR 2021 over Sewickley 29 Creek, Mt. Pleasant Township, Bridge 30 Replacement 1,463,000 19990S0504B0514 - 453 -
1 (Base Construction Allocation - 2 $1,213,000) 3 (Land Allocation - $50,000) 4 (Design and Contingencies - $200,000) 5 (41) SR 2025, SR 2025 over Tributary of 6 Jacobs Creek, Mt. Pleasant Township, 7 Bridge Replacement 250,000 8 (Base Construction Allocation - 9 $225,000) 10 (Design and Contingencies - $25,000) 11 (42) SR 4034, SR 4034 over Pine Run, 12 Allegheny Township, Bridge Replacement 818,000 13 (Base Construction Allocation - 14 $588,000) 15 (Land Allocation - $30,000) 16 (Design and Contingencies - $200,000) 17 (43) SR 4071, SR 4071 over Branch of Pine 18 Run, Allegheny Township, Bridge 19 Replacement 305,000 20 (Base Construction Allocation - 21 $200,000) 22 (Land Allocation - $5,000) 23 (Design and Contingencies - $100,000) 24 (44) SR 4089, SR 4089 over Branch of 25 Chartiers Run, Allegheny Township, 26 Bridge Replacement 348,000 27 (Base Construction Allocation - 28 $238,000) 29 (Land Allocation - $10,000) 30 (Design and Contingencies - $100,000) 19990S0504B0514 - 454 -
1 (45) T-987, (formerly SR 1071) over 2 Hypocrite Creek, Fairfield Township, 3 Four State Bridges, Bridge Replacement 800,000 4 (Base Construction Allocation - 5 $680,000) 6 (Land Allocation - $40,000) 7 (Design and Contingencies - $80,000) 8 (46) SR 0381, SR 0381 over Laughlintown 9 Run, Ligonier Township, Bridge 10 Replacement 465,000 11 (Base Construction Allocation - 12 $350,000) 13 (Land Allocation - $15,000) 14 (Design and Contingencies - $100,000) 15 (47) SR 2043, SR 2043 over Two Mile Run, 16 Ligonier Township, Bridge Replacement 465,000 17 (Base Construction Allocation - 18 $350,000) 19 (Land Allocation - $15,000) 20 (Design and Contingencies - $100,000) 21 (48) SR 2045, SR 2045 over Two Mile Run, 22 Ligonier Township, Bridge Replacement 465,000 23 (Base Construction Allocation - 24 $350,000) 25 (Land Allocation - $15,000) 26 (Design and Contingencies - $100,000) 27 (49) SR 2045, SR 2045 over Loyalhanna 28 Creek, Ligonier Township, Bridge 29 Replacement 1,588,000 30 (Base Construction Allocation - 19990S0504B0514 - 455 -
1 $1,313,000) 2 (Land Allocation - $75,000) 3 (Design and Contingencies - $200,000) 4 (50) SR 0119, Bridge No.2 over Crabtree 5 Creek, Hempfield Township, Bridge 6 Replacement 577,000 7 (Base Construction Allocation - 8 $377,000) 9 (Land Allocation - $25,000) 10 (Design and Contingencies - $175,000) 11 (51) SR 8036, New Stanton Ramp Bridge over 12 SR 3091, Turnback Project, New Stanton 13 Borough, Bridge Rehabilitation 475,000 14 (Base Construction Allocation - 15 $395,000) 16 (Design and Contingencies - $80,000) 17 (52) SR 2045, Bridge over Loyalhanna 18 Creek, Ligonier Township, Bridge 19 Replacement 800,000 20 (Base Construction Allocation - 21 $600,000) 22 (Land Allocation - $25,000) 23 (Design and Contingencies - $175,000) 24 Section 70. Wyoming County. 25 (a) Local Bridges 26 (1) Exeter Township, T-336, Bridge No.1, 2 27 Miles Southwest of Falls, Bridge 28 Replacement 280,000 29 (Base Construction Allocation - 30 $240,000) 19990S0504B0514 - 456 -
1 (Land Allocation - $10,000) 2 (Design and Contingencies - $30,000) 3 (2) Falls Township, T-336 over White Lock 4 Stream, Bridge Replacement 280,000 5 (Base Construction Allocation - 6 $240,000) 7 (Land Allocation - $10,000) 8 (Design and Contingencies - $30,000) 9 (3) Exeter Township, T-336 over Mill 10 Creek, Bridge Replacement 214,000 11 (Base Construction Allocation - 12 $166,000) 13 (Land Allocation - $20,000) 14 (Design and Contingencies - $28,000) 15 (4) Eaton Township, T-413, Pedestrian 16 Bridge over Bowman's Creek at 17 Eatonville, Bridge Rehabilitation 125,000 18 (Base Construction Allocation - 19 $113,000) 20 (Design and Contingencies - $12,000) 21 (b) State Bridges 22 (1) SR 3001, Bridge at Junction with SR 23 4004 over Branch of Susquehanna River, 24 Windham Township, Bridge Painting 60,000 25 (Base Construction Allocation - 26 $50,000) 27 (Design and Contingencies - $10,000) 28 (2) State Bridges, Countywide Bridge Zone 29 Painting, Bridge Painting 370,000 30 (Base Construction Allocation - 19990S0504B0514 - 457 -
1 $350,000) 2 (Land Allocation - $10,000) 3 (Design and Contingencies - $10,000) 4 (3) SR 0006, Meshoppen Creek Bridge over 5 Meshoppen Creek, Meshoppen Borough, 6 Bridge Rehabilitation 340,000 7 (Base Construction Allocation - 8 $300,000) 9 (Design and Contingencies - $40,000) 10 (4) SR 3003, Bowmans Creek Bridge over 11 Bowmans Creek, Eaton Township, Bridge 12 Replacement 260,000 13 (Base Construction Allocation - 14 $200,000) 15 (Design and Contingencies - $60,000) 16 Section 71. York County. 17 (a) Local Bridges 18 (1) Carroll Township, Gettysburg Road 19 Bridge over Yellow Breeches Creek, 20 Bridge Replacement 860,000 21 (Base Construction Allocation - 22 $700,000) 23 (Land Allocation - $10,000) 24 (Design and Contingencies - $150,000) 25 (2) Codorus Township, Seitzville Road over 26 South Branch of Codorus Creek, Bridge 27 Replacement 300,000 28 (Base Construction Allocation - 29 $200,000) 30 (Land Allocation - $15,000) 19990S0504B0514 - 458 -
1 (Design and Contingencies - $85,000) 2 (3) Dover Township, Cardinal Lane over Fox 3 Run, Bridge Replacement 115,000 4 (Base Construction Allocation - 5 $70,000) 6 (Land Allocation - $15,000) 7 (Design and Contingencies - $30,000) 8 (4) Dover Township, Conewago Road over 9 Salem Run, Bridge Replacement 300,000 10 (Base Construction Allocation - 11 $200,000) 12 (Land Allocation - $15,000) 13 (Design and Contingencies - $85,000) 14 (5) East Hopewell Township, South Church 15 Street Extended, Bridge No.1, Bridge 16 Rehabilitation 9,000 17 (Base Construction Allocation - $8,000) 18 (Design and Contingencies - $1,000) 19 (6) East Hopewell Township, South Church 20 Street Extended, Bridge No.2, over 21 Rambo Run, Bridge Rehabilitation 60,000 22 (Base Construction Allocation - 23 $50,000) 24 (Design and Contingencies - $10,000) 25 (7) East Hopewell Township, Manifold 26 School Road Bridge, Bridge 27 Rehabilitation 7,000 28 (Base Construction Allocation - $6,000) 29 (Design and Contingencies - $1,000) 30 (8) East Hopewell Township, Trout School 19990S0504B0514 - 459 -
1 Road Bridge, Bridge Replacement 45,000 2 (Base Construction Allocation - 3 $30,000) 4 (Land Allocation - $5,000) 5 (Design and Contingencies - $10,000) 6 (9) Hellam Township, Valley Acres Road 7 over Tributary of Kreutz Creek, Bridge 8 Rehabilitation 40,000 9 (Base Construction Allocation - 10 $35,000) 11 (Design and Contingencies - $5,000) 12 (10) Hellam Township, Libhart Mill Road 13 over Tributary of Kreutz Creek, Bridge 14 Rehabilitation 40,000 15 (Base Construction Allocation - 16 $35,000) 17 (Design and Contingencies - $5,000) 18 (11) Manchester Township, T-900, Woodland 19 View Drive over Conrail, Bridge 20 Replacement 395,000 21 (Base Construction Allocation - 22 $275,000) 23 (Land Allocation - $30,000) 24 (Design and Contingencies - $90,000) 25 (12) Manchester Township, T-940, Bear Road 26 2,000 Feet North of Susquehanna Trail, 27 Bridge Replacement 40,000 28 (Base Construction Allocation - 29 $25,000) 30 (Land Allocation - $5,000) 19990S0504B0514 - 460 -
1 (Design and Contingencies - $10,000) 2 (13) Manheim Township, T-320 over Unnamed 3 Tributary of Gunpowder Falls Creek, 4 Bridge Replacement 150,000 5 (Base Construction Allocation - 6 $100,000) 7 (Land Allocation - $10,000) 8 (Design and Contingencies - $40,000) 9 (14) Manheim Township, T-346 over West 10 Branch of Codorus Creek, Bridge 11 Replacement 250,000 12 (Base Construction Allocation - 13 $190,000) 14 (Land Allocation - $10,000) 15 (Design and Contingencies - $50,000) 16 (15) Manheim Township, T-357 over Unnamed 17 Tributary of West Branch of Codorus 18 Creek, Bridge Replacement 160,000 19 (Base Construction Allocation - 20 $110,000) 21 (Land Allocation - $10,000) 22 (Design and Contingencies - $40,000) 23 (16) Manheim Township, T-370 over West 24 Branch of Codorus Creek, Bridge 25 Replacement 200,000 26 (Base Construction Allocation - 27 $140,000) 28 (Land Allocation - $10,000) 29 (Design and Contingencies - $50,000) 30 (17) Manheim Township, T-413 over West 19990S0504B0514 - 461 -
1 Branch of Codorus Creek, Bridge 2 Replacement 150,000 3 (Base Construction Allocation - 4 $100,000) 5 (Land Allocation - $10,000) 6 (Design and Contingencies - $40,000) 7 (18) Manheim Township, Tannery Road over 8 West Branch of Codorus Creek, Bridge 9 Replacement 250,000 10 (Base Construction Allocation - 11 $180,000) 12 (Land Allocation - $10,000) 13 (Design and Contingencies - $60,000) 14 (19) Paradise Township, Shady Dell Road, 15 Bridge Replacement 190,000 16 (Base Construction Allocation - 17 $110,000) 18 (Land Allocation - $10,000) 19 (Design and Contingencies - $70,000) 20 (20) Paradise Township, Beaver Creek Road 21 over Beaver Creek, Bridge Replacement 275,000 22 (Base Construction Allocation - 23 $195,000) 24 (Land Allocation - $10,000) 25 (Design and Contingencies - $70,000) 26 (21) Penn Township, Center Street over 27 Tributary of Oil Creek, Bridge 28 Replacement 183,000 29 (Base Construction Allocation - 30 $163,000) 19990S0504B0514 - 462 -
1 (Land Allocation - $10,000) 2 (Design and Contingencies - $10,000) 3 (22) Penn Township, Westminster Avenue 4 over Plum Creek, Bridge Replacement 230,000 5 (Base Construction Allocation - 6 $207,000) 7 (Land Allocation - $8,000) 8 (Design and Contingencies - $15,000) 9 (23) Penn Township, Park Heights over 10 Tributary of Plum Creek, Bridge 11 Replacement 244,000 12 (Base Construction Allocation - 13 $234,000) 14 (Design and Contingencies - $10,000) 15 (24) Red Lion Borough, North Charles 16 Street over Former Maryland and 17 Pennsylvania Railroad, Bridge 18 Replacement 395,000 19 (Base Construction Allocation - 20 $275,000) 21 (Land Allocation - $30,000) 22 (Design and Contingencies - $90,000) 23 (25) Spring Garden Township, Tri Hill Road 24 over Tyler Run, Bridge Replacement 200,000 25 (Base Construction Allocation - 26 $120,000) 27 (Land Allocation - $20,000) 28 (Design and Contingencies - $60,000) 29 (26) Windsor Borough, West Gay Street over 30 Fishing Creek, Bridge Replacement 200,000 19990S0504B0514 - 463 -
1 (Base Construction Allocation - 2 $120,000) 3 (Land Allocation - $20,000) 4 (Design and Contingencies - $60,000) 5 (27) York Township, School Street over 6 Branch of Mill Creek, Bridge 7 Replacement 250,000 8 (Base Construction Allocation - 9 $200,000) 10 (Design and Contingencies - $50,000) 11 (28) Conewago Township, T-956 over Billion 12 Run, Bridge Replacement 290,000 13 (Base Construction Allocation - 14 $220,000) 15 (Land Allocation - $10,000) 16 (Design and Contingencies - $60,000) 17 (29) Conewago Township, T-956 over Poplar 18 Run, Bridge Replacement 310,000 19 (Base Construction Allocation - 20 $240,000) 21 (Land Allocation - $10,000) 22 (Design and Contingencies - $60,000) 23 (b) State Bridges 24 (1) SR 0194, Broadway Street Bridge over 25 Red Run, Washington Township, Bridge 26 Replacement 245,000 27 (Base Construction Allocation - 28 $150,000) 29 (Land Allocation - $10,000) 30 (Design and Contingencies - $85,000) 19990S0504B0514 - 464 -
1 (2) SR 0234, East Berlin Road Bridge over 2 Paradise Creek, Jackson Township, 3 Bridge Replacement 325,000 4 (Base Construction Allocation - 5 $250,000) 6 (Land Allocation - $10,000) 7 (Design and Contingencies - $65,000) 8 (3) SR 3074, Smoketown Road Bridge over 9 Cod Creek, Manheim Township, Bridge 10 Replacement 325,000 11 (Base Construction Allocation - 12 $215,000) 13 (Land Allocation - $10,000) 14 (Design and Contingencies - $100,000) 15 (4) SR 0116, York Street over Tributary of 16 Oil Creek, Penn Township, Bridge 17 Replacement 275,000 18 (Base Construction Allocation - 19 $240,000) 20 (Land Allocation - $15,000) 21 (Design and Contingencies - $20,000) 22 (5) SR 0116, SR 0116 over Codorus Creek, 23 Spring Grove Borough, Bridge 24 Replacement 300,000 25 (Base Construction Allocation - 26 $240,000) 27 (Land Allocation - $15,000) 28 (Design and Contingencies - $45,000) 29 (6) SR 0194, Frederick Street over Plum 30 Creek, Penn Township, Bridge 19990S0504B0514 - 465 -
1 Replacement 262,000 2 (Base Construction Allocation - 3 $234,000) 4 (Land Allocation - $8,000) 5 (Design and Contingencies - $20,000) 6 (7) SR 1012, Emig Road over Conrail, 7 Manchester Township, Bridge 8 Replacement 395,000 9 (Base Construction Allocation - 10 $275,000) 11 (Land Allocation - $30,000) 12 (Design and Contingencies - $90,000) 13 (8) SR 2031, Penn Street over Fishing 14 Creek, Windsor Borough, Bridge 15 Replacement 200,000 16 (Base Construction Allocation - 17 $120,000) 18 (Land Allocation - $20,000) 19 (Design and Contingencies - $60,000) 20 (9) SR 3001, South George Street over 21 Tyler Run, Spring Garden Township, 22 Bridge Replacement 200,000 23 (Base Construction Allocation - 24 $120,000) 25 (Land Allocation - $20,000) 26 (Design and Contingencies - $60,000) 27 (10) SR 3074, Smoketown Road Bridge over 28 Codorus Creek, Manheim Township, Bridge 29 Replacement 240,000 30 (Base Construction Allocation - 19990S0504B0514 - 466 -
1 $150,000) 2 (Land Allocation - $10,000) 3 (Design and Contingencies - $80,000) 4 Section 72. Statewide. 5 Construction of advanced wetland mitigation 6 projects necessary to replace wetlands displaced 7 by bridge projects authorized under the act of 8 December 8, 1982 (P.L.848, No.235), known as the 9 Highway-Railroad and Highway Bridge Capital Budget 10 Act for 1982-1983 3,100,000 11 (Base Construction Allocation - 12 $2,500,000) 13 (Land Allocation - $350,000) 14 (Design and Contingencies - $250,000) 15 Section 72.1. State forestry bridge projects itemized. 16 Projects in the category of State forestry bridge projects to 17 be constructed by the Department of Conservation and Natural 18 Resources, its successors or assigns, and to be financed by oil 19 company franchise tax revenues pursuant to 75 Pa.C.S. § 20 9502(a)(2)(iv) (relating to imposition of tax), are hereby 21 itemized, together with their respective estimated costs, as 22 follows: 23 (a) Local Bridges (Reserved) 24 (b) State Forestry Bridges 25 (1) Adams County 26 (A) Replacement of Bridge No.01-0005, 27 District Road Bridge over Carbaugh 28 Run 120,000 29 (B) Replacement of Bridge No.01-0004, 30 Dead Womans Hollow Road Bridge over 19990S0504B0514 - 467 -
1 Mountain Creek 150,000 2 (2) Bedford County 3 (A) Replacement of Bridge No.02-0002, 4 Wertz Road Bridge over Cove Creek 100,000 5 (B) Replacement of Bridge No.02-0001, 6 Wertz Road Bridge over Cove Creek 150,000 7 (3) Cameron County 8 (A) Replacement of Bridge No.13-0012, 9 Brooks Run Road Bridge over Brooks 10 Road 220,000 11 (B) Replacement of Bridge No.13-0060, 12 Brooks State House Bridge over 13 Brooks Road 250,000 14 (C) Replacement of Bridge No.13-0037, 15 Mix Run Road Bridge over Mix Run 200,000 16 (D) Replacement of Bridge No.13-0038, 17 Mix Run Road over Mix Run 166,000 18 (4) Centre County 19 (A) Replacement of Bridge No.07-0010, 20 Siglerville Millheim Pike Bridge 162,000 21 (B) Replacement of Bridge No.07-0015, 22 Green Valley Road Bridge 260,000 23 (C) Replacement of Bridge No.07-0033, 24 Pine Creek Road Bridge 386,000 25 (D) Replacement of Bridge No.07-0045, 26 McCall Dam Road Bridge over White 27 Deer Creek 180,000 28 (E) Replacement of Bridge No.09-0030, 29 Six Mile Run Bridge 192,000 30 (F) Replacement of Bridge No.10-0028, 19990S0504B0514 - 468 -
1 State Line Road Bridge 196,000 2 (G) Replacement of Bridge No.05-0003, 3 Krise Valley Road Bridge over 4 Potter Run 100,000 5 (H) Replacement of Bridge No.05-0004, 6 Bear Meadows Road Bridge over 7 Sinking Creek 100,000 8 (I) Replacement of Bridge No.05-0005, 9 Bear Meadows Road Bridge over 10 Galbraith Run 150,000 11 (J) Replacement of Bridge No.07-0008, 12 Poe Valley Road Bridge over Big Poe 13 Creek 200,000 14 (K) Replacement of Bridge No.07-0028, 15 Cherry Run Road Bridge over Cherry 16 Run 102,000 17 (L) Replacement of Bridge No.07-0029, 18 Cherry Run Road Bridge over Cherry 19 Run 240,000 20 (M) Replacement of Bridge No.07-0035, 21 Stoney Run Road Bridge over Pine 22 Creek 375,000 23 (N) Replacement of Bridge No.09-0026, 24 Huckleberry Road Bridge over Black 25 Moshannon Creek 250,000 26 (O) Replacement of Bridge No.09-0029, 27 Claymine Road Bridge over Six Mile 28 Run 200,000 29 (P) Replacement of Bridge No.10-0026, 30 Panther Road Bridge over Wolf Run 150,000 19990S0504B0514 - 469 -
1 (Q) Replacement of Bridge No.07-0007, 2 Poe Paddy Drive Bridge over Big Poe 3 Creek 170,000 4 (5) Clearfield County 5 (A) Replacement of Bridge No.09-0005, 6 Tyler Road Bridge over Laurel Run 284,000 7 (B) Replacement of Bridge No.09-0019, 8 Dent's Branch Road Bridge 282,000 9 (C) Replacement of Bridge No.09-0022, 10 Merrill Road Bridge 197,000 11 (D) Replacement of Bridge No.09-0012, 12 Little Medix Road Bridge over 13 Little Medix Run 220,000 14 (E) Replacement of Bridge No.09-0013, 15 Little Medix Road Bridge over 16 Little Medix Run 100,000 17 (F) Replacement of Bridge No.09-0014, 18 Little Medix Road Bridge over 19 Little Medix Run 100,000 20 (G) Replacement of Bridge No.09-0015, 21 Little Medix Road Bridge over 22 Little Medix Run 100,000 23 (H) Replacement of Bridge No.09-0018, 24 Dent's Branch Road Bridge over 25 Dent's Branch Street 160,000 26 (I) Replacement of Bridge No.09-0020, 27 Dent's Branch Road Bridge over 28 Dent's Branch Street 165,000 29 (J) Replacement of Bridge No.09-0021, 30 Ames Road Bridge over Deer Creek 145,000 19990S0504B0514 - 470 -
1 (K) Replacement of Bridge No.09-0023, 2 Lost Run Road Bridge over Giffor 3 Run 138,000 4 (L) Replacement of Bridge No.09-0034, 5 Reservoir Road Bridge over Upper 6 Three Run 120,000 7 (6) Clinton County 8 (A) Replacement of Bridge No.10-0033, 9 Cooks Run Road Bridge over Cooks 10 Run 110,000 11 (B) Replacement of Bridge No.10-0042, 12 Two Mile Road Bridge 100,000 13 (C) Replacement of Bridge No.10-0043, 14 Big Basin Road Bridge over Shintown 15 Run 206,000 16 (D) Replacement of Bridge No.10-059, 17 Bridge over Right Branch of Young 18 Womans Creek Road 287,000 19 (E) Replacement of Bridge No.10-0064, 20 Trout Run Bridge 255,000 21 (F) Replacement of Bridge No.15-0021, 22 County Line Road Bridge 167,000 23 (G) Replacement of Bridge No.10-0032, 24 Cooks Run Road Bridge over Crowley 25 Run 145,000 26 (H) Replacement of Bridge No.10-0044, 27 Robbins Road Bridge over Shintown 28 Run 120,000 29 (I) Replacement of Bridge No.10-0051, 30 Fork Hill Road Bridge over Lebo 19990S0504B0514 - 471 -
1 Run 168,000 2 (J) Replacement of Bridge No.10-0052, 3 Left Branch Young Womans Road 4 Bridge over Mud Lick Run 140,000 5 (K) Replacement of Bridge No.10-0053, 6 Left Branch Young Womans Road 7 Bridge over Shingle Branch 145,000 8 (L) Replacement of Bridge No.10-0054, 9 Left Branch Young Womans Road 10 Bridge over Greenlick Run 135,000 11 (M) Replacement of Bridge No.10-0057, 12 Sandy Run Road Bridge over Paddy 13 Run 140,000 14 (N) Replacement of Bridge No.10-0061, 15 Graham Road Bridge over Ferney Run 135,000 16 (O) Replacement of Bridge No.10-0063, 17 Hyner Run Road Bridge over Long 18 Fork 110,000 19 (P) Replacement of Bridge No.10-0035, 20 Bridge over Camp Run 100,000 21 (Q) Replacement of Bridge No.10-0037, 22 Bridge over Cooks Run 160,000 23 (R) Replacement of Bridge No.12-0032, 24 Gotshall Road Bridge over Gotshall 25 Run 120,000 26 (S) Replacement of Bridge No.10-0036, 27 over Rock Run 150,000 28 (T) Replacement of Bridge No.07-0054, 29 Long Run 91,000 30 (U) Replacement of Bridge No.07-0055, 19990S0504B0514 - 472 -
1 over Cooper Run 70,000 2 (V) Replacement of Bridge No.10-0065, 3 Old Woods Road over Two Mile Run 100,000 4 (7) Cumberland County 5 (A) Replacement of Bridge No.01-0006, 6 Woodrow Road Run Bridge over 7 Mountain Creek 150,000 8 (B) Replacement of Bridge No.01-0010, 9 Milesburn Road Bridge 102,000 10 (C) Replacement of Bridge No.01-0008, 11 Strohms Hollow Road Bridge over 12 Strohms Hollow Run 138,000 13 (D) Replacement of Bridge No.01-0023, 14 Togg Run Road Bridge over Togg Run 138,000 15 (8) Dauphin County 16 (A) Replacement of large culvert, 17 White Oak Road Bridge over White 18 Oak Run 100,000 19 (9) Elk County 20 (A) Replacement of Bridge No.13-0040, 21 Red Run Road Bridge 160,000 22 (B) Replacement of Bridge No.13-0049, 23 Shaffer Draft Road Bridge 175,000 24 (C) Replacement of Bridge No.13-0050, 25 West Hicks Run Road Bridge 175,000 26 (D) Replacement of Bridge No.13-0052, 27 Bridge over East Branch of Hicks 28 Run 175,000 29 (E) Replacement of Bridge No.13-0053, 30 Bridge over East Branch of Hicks 19990S0504B0514 - 473 -
1 Run 175,000 2 (F) Replacement of Bridge No.09-0006, 3 Blackwell Road Bridge over Laurel 4 Road 142,000 5 (G) Replacement of Bridge No.13-0028, 6 Porcupine Road Bridge over Dent's 7 Run 183,000 8 (H) Replacement of Bridge No.13-0032, 9 Dent's Run Road Bridge over Little 10 Dent's Run 110,000 11 (I) Replacement of Bridge No.13-0039, 12 Mix Run Road Bridge over Red Run 184,000 13 (10) Franklin County 14 (A) Replacement of Bridge No.01-0016, 15 Wirt Road Bridge 147,000 16 (B) Replacement of Bridge No.01-0022, 17 Rattlesnake Run Road Bridge 149,000 18 (C) Replacement of Bridge No.01-0021, 19 Lindsay Lot Road Bridge over 20 Furnace Run 100,000 21 (D) Replacement of Bridge No.01-0019, 22 Biesecker Gap Road Bridge over 23 Biesecker Run 110,000 24 (11) Huntingdon County 25 (A) Replacement of Bridge No.05-0012, 26 Colerain Road Bridge 235,000 27 (B) Replacement of Bridge No.05-0014, 28 Coopers Gap Road Bridge 160,000 29 (C) Replacement of Bridge No.05-0021, 30 Stone Creek Road Bridge 182,000 19990S0504B0514 - 474 -
1 (D) Replacement of Bridge No.05-0027, 2 Diamond Valley Road Bridge over 3 Globe Run 100,000 4 (E) Replacement of Bridge No.05-0028, 5 Laurel Run Road Bridge 213,000 6 (F) Replacement of Bridge No.05-0051, 7 Coopers Gap Road Bridge 174,000 8 (G) Replacement of Bridge No.05-0010, 9 Martin Road Bridge over Standing 10 Stone Creek 173,000 11 (H) Replacement of Bridge No.05-0011, 12 Pennsylvania Furnace Road Bridge 13 over Globe Run 140,000 14 (I) Replacement of Bridge No.05-0017, 15 Pine Swamp Road Bridge over Shaver 16 Creek 150,000 17 (J) Replacement of Bridge No.05-0018, 18 Beidler Road Bridge over Laurel 19 Run 142,000 20 (K) Replacement of Bridge No.05-0020, 21 Rag Hollow Road Bridge over East 22 Branch Stone Creek 150,000 23 (L) Replacement of Bridge No.05-0026, 24 Pennsylvania Furnace Road Bridge 25 over Pennsylvania Furnace Run 110,000 26 (M) Replacement of Bridge No.05-0019, 27 Stone Creek Road over Detweiler 28 Run 200,000 29 (N) Replacement of Bridge No.05-0022, 30 Seeger Road over Stone Creek 200,000 19990S0504B0514 - 475 -
1 (12) Jefferson County 2 (A) Replacement of Bridge No.08-0003, 3 Callen Run Road Bridge over Callen 4 Run 200,000 5 (B) Replacement of Bridge No.08-0001, 6 Corbett Road Bridge over Clear 7 Creek 170,000 8 (13) Juniata County 9 (A) Replacement of Bridge No.03-0007, 10 Spectacle Gap Bridge 158,000 11 (B) Replacement of Bridge No.03-0005, 12 East Licking Drive Bridge over East 13 Licking Creek 242,000 14 (C) Replacement of Bridge No.03-0006, 15 East Licking Drive Bridge over East 16 Licking Creek 222,000 17 (13.1) Lackawanna County 18 (A) Replacement of Bridge No.11-9000, 19 Sassafras Road over Spring Run 80,000 20 (14) Lycoming County 21 (A) Replacement of Bridge No.12-0015, 22 Rock Run Road Bridge 175,000 23 (B) Replacement of Bridge No.12-0016, 24 Rock Run Road Bridge 164,000 25 (C) Replacement of Bridge No.12-0019, 26 Little Bear Bridge 193,000 27 (D) Replacement of Bridge No.12-0020, 28 Little Bear Bridge 193,000 29 (E) Replacement of Bridge No.12-0021, 30 Little Bear Bridge 193,000 19990S0504B0514 - 476 -
1 (F) Replacement of Bridge No.12-0022, 2 Little Bear Creek Road Bridge 237,000 3 (G) Replacement of Bridge No.12-0028, 4 Fourth Gap Road Bridge 100,000 5 (H) Replacement of Large Culvert, 6 Frances Road at Big Hollow 100,000 7 (I) Replacement of Bridge No.12-0017, 8 Yellow Dog Road Bridge over Rock 9 Run 245,000 10 (J) Replacement of Bridge No.12-0040, 11 English Run Road Bridge over 12 English Run 238,000 13 (K) Replacement of Bridge No.12-0046, 14 Morris Run Road Bridge over Slate 15 Run 240,000 16 (L) Replacement of Bridge No.12-0013, 17 Hillgrove Road Bridge over Pleasant 18 Stream 150,000 19 (M) Replacement of Bridge No.12-0027, 20 Cove Road Bridge over Fourth Gap 140,000 21 (N) Replacement of Bridge No.12-0023, 22 Little Bear Road Bridge over Little 23 Bear Creek 120,000 24 (O) Replacement of Bridge No.12-0010, 25 Pleasant Stream Road over Bovier 26 Run 150,000 27 (15) Mifflin County 28 (A) Replacement of Bridge No.03-0008, 29 Spectacle Gap Road Bridge over East 30 Licking Creek 150,000 19990S0504B0514 - 477 -
1 (B) Replacement of Bridge No.07-0004, 2 Havice Valley Road Bridge over 3 Panther Run 257,000 4 (C) Replacement of Bridge No.05-0051, 5 Cooper Gap Road Bridge over Cooper 6 Gap Run 172,000 7 (D) Replacement of Bridge No.07-0057, 8 Stillhouse Hollow Road Bridge over 9 Greens Valley Street 128,000 10 (E) Replacement of Bridge No.07-0003, 11 Havice Valley Road Bridge over 12 Swift Run 125,000 13 (16) Monroe County 14 (A) Replacement of Bridge No.19-0001, 15 Laurel Run Road Bridge 159,000 16 (17) Perry County 17 (A) Replacement of Bridge No.03-0010, 18 Elk Hill Road Bridge 152,000 19 (B) Replacement of Bridge No.03-0011, 20 Elk Hill Road Bridge 152,000 21 (C) Replacement of Bridge No.03-0014, 22 Laurel Run Road Bridge over Laurel 23 Run, North Branch 100,000 24 (D) Replacement of Bridge No.03-0015, 25 Sheaffer Run Bridge, Undermining at 26 South Abutment 150,000 27 (E) Replacement of Bridge No.03-0016, 28 Laurel Run Road Bridge 185,000 29 (F) Replacement of Bridge No.03-0018, 30 Twin Bridge over Laurel Run 180,000 19990S0504B0514 - 478 -
1 (G) Replacement of Culvert, Shearer 2 Dug Box Culvert 100,000 3 (H) Replacement of Culvert, Laurel Run 4 Road over Tributary of Laurel Run 60,000 5 (18) Pike County 6 (A) Replacement of Bridge No.19-0004, 7 Pine Flats Run Road Bridge 160,000 8 (B) Replacement of Bridge No.19-0005, 9 Bruce Lake Road Bridge over 10 Tributary Egypt Meadow Lake 120,000 11 (C) Replacement of Bridge No.19-0803, 12 Bruce Lake Road Bridge over Egypt 13 Meadow Lake 145,000 14 (D) Replacement of Bridge No.19-0002, 15 Hay Road Bridge over Middle Branch 115,000 16 (19) Potter County 17 (A) Replacement of Bridge No.15-0013, 18 Windfall Road Bridge 160,000 19 (B) Replacement of Bridge No.15-0015, 20 Joerg Run Road Bridge 160,000 21 (C) Replacement of Bridge No.15-0018, 22 Lebo Run Road Bridge 160,000 23 (D) Replacement of Bridge No.15-0020, 24 Robinson Road Bridge 230,000 25 (E) Replacement of Bridge No.15-0024, 26 Robinson Road Bridge 140,000 27 (F) Replacement of Bridge No.16-0015, 28 Butternut Hollow Road Bridge over 29 Kettle Creek 110,000 30 (G) Replacement of Bridge No.15-0003, 19990S0504B0514 - 479 -
1 Jones Run Road Bridge over Freeman 2 Run 175,000 3 (H) Replacement of Bridge No.15-0010, 4 Black Diamond Road Bridge over Big 5 Moores Run 163,000 6 (I) Replacement of Bridge No.15-0011, 7 Horton Run Road Bridge over East 8 Fork Sinnemahoning Creek 125,000 9 (J) Replacement of Bridge No.15-0014, 10 Hungry Hollow Road Bridge over 11 Cross Fork Creek 192,000 12 (K) Replacement of Bridge No.15-0025, 13 Nelson Run Road Bridge over Big 14 Nelson Run 138,000 15 (L) Replacement of Bridge No.15-0027, 16 Ellis Hollow Road Bridge over Nine 17 Mile Run 146,000 18 (M) Replacement of Bridge No.15-0012, 19 Bailey Run Bridge over Bailey Run 250,000 20 (N) Replacement of Bridge No.15-0019, 21 Twelve Mile Bridge over Spring 22 Brook 107,000 23 (O) Replacement of Bridge No.15-0013 24 over Windfall Run Road over 25 Windfall Run in Forest District 26 No.3 196,000 27 (P) Replacement of Bridge No.15-0015 28 over Joerg Run Road over Joerg Run 29 in Forest District No.3 135,000 30 (Q) Replacement of Bridge No.15-0018 19990S0504B0514 - 480 -
1 over Lebo Road over Lebo Run in 2 Forest District No.3 148,000 3 (20) Schuykill County 4 (A) Replacement of Bridge No.18-0003, 5 Panther Road Bridge over Panther 6 Creek 80,000 7 (21) Snyder County 8 (A) Replacement of Bridge No.07-0025, 9 Swift Run Road Bridge over Swift 10 Run 138,000 11 (22) Somerset County 12 (A) Replacement of Bridge No.04-0002, 13 Blue Hole Road Bridge 192,000 14 (B) Replacement of Bridge No.04-0008, 15 Cole Run Road Bridge 138,000 16 (C) Replacement of Bridge No.04-0004, 17 South Wolf Run Road Bridge over Tub 18 Mill Run 184,000 19 (D) Replacement of Bridge No.04-0006, 20 Jones Mill Run Road Bridge over 21 Jones Mill Run 140,000 22 (E) Replacement of Bridge No.06-0002, 23 State Forest Road Bridge over 24 Tributary to Roaring Fork 82,000 25 (F) Replacement of Bridge No.06-0004, 26 Shade Road Bridge over Mile Run 131,000 27 (23) Sullivan County 28 (A) Replacement of Bridge No.20-0002, 29 Brunnerdale Road Bridge 220,000 30 (B) Replacement of Bridge No.20-0008, 19990S0504B0514 - 481 -
1 Shanerburg Road Bridge 212,000 2 (C) Replacement of Bridge No.20-0011, 3 Shanerburg Road Bridge over 4 Shanerburg Run 110,000 5 (D) Replacement of Bridge No.20-0004, 6 Mill Creek Road Bridge over Mill 7 Creek 135,000 8 (E) Replacement of Bridge No.20-0005, 9 Mill Creek Road Bridge over Mill 10 Creek 100,000 11 (24) Tioga County 12 (A) Replacement of Bridge No.16-0004, 13 Left Asaph Road Bridge 248,000 14 (B) Replacement of Bridge No.16-0005, 15 Asaph Run Bridge 414,000 16 (C) Replacement of Bridge No.16-0010, 17 Painter Leetonia Road Bridge 170,000 18 (D) Replacement of Bridge No.16-0011, 19 Cedar Run Bridge 170,000 20 (E) Replacement of Bridge No.16-0020, 21 Mine Hole Road Bridge 107,000 22 (F) Replacement of Bridge No.16-0003, 23 Left Asaph Road Bridge over Left 24 Asaph Run 186,000 25 (G) Replacement of Bridge No.16-0008, 26 Owasse Road Bridge over Chimney 27 Hollow 120,000 28 (H) Replacement of Bridge No.16-0015, 29 Butternut Hollow Road Bridge over 30 Kettle Creek 145,000 19990S0504B0514 - 482 -
1 (I) Replacement of Bridge No.12-0049, 2 Francis Road Bridge over Francis 3 Branch 150,000 4 (J) Replacement of Bridge No.16-0016, 5 Bear Run Road Bridge over Cushman 6 Branch 160,000 7 (K) Replacement of Bridge No.16-0018, 8 Mine Hole Road Bridge over Mine 9 Hole Run 150,000 10 (L) Replacement of Bridge No.12-0002, 11 Left Asaph over Baker Branch 200,000 12 (M) Replacement of Bridge No.16-0019, 13 Mine Hole Road over East Mine Hole 14 Run 150,000 15 (25) Union County 16 (A) Replacement of Bridge No.07-0016, 17 Hoofnagle Road Bridge 235,000 18 (B) Replacement of Bridge No.07-0017, 19 Weikert Run Road Bridge 235,000 20 (C) Replacement of Bridge No.07-0047, 21 White Deer Creek Road Bridge 234,000 22 (D) Replacement of Bridge No.07-0046, 23 Cooper Mill Road Bridge over White 24 Deer Creek 212,000 25 (E) Replacement of Bridge No.07-0048, 26 White Deer Creek Road Bridge over 27 White Deer Creek 235,000 28 (F) Replacement of Bridge No.07-0041, 29 Brandon Road Bridge over North 30 Branch of Buffalo Creek 107,000 19990S0504B0514 - 483 -
1 (G) Replacement of Bridge No.07-0040, 2 Pine Creek Road Bridge over Rapid 3 Run 165,000 4 (26) Westmoreland County 5 (A) Replacement of Bridge No.04-0011, 6 Linn Run Road Bridge over Linn Run 125,000 7 (B) Replacement of Bridge No.04-0012, 8 Linn Run Road Bridge over Rock Run 135,000 9 Section 72.2. State park bridge projects itemized. 10 Projects in the category of State park bridge projects to be 11 constructed by the Department of Conservation and Natural 12 Resources, its successors or assigns, and to be financed by oil 13 company franchise tax revenues pursuant to 75 Pa.C.S. § 14 9502(a)(2)(iv) (relating to imposition of tax), are hereby 15 itemized, together with their respective estimated costs, as 16 follows: 17 (a) Local Bridges (Reserved) 18 (b) State Park Bridges 19 (1) Beaver County 20 (A) Replacement of Bridge No.13-1200 21 over Valley Road End in Raccoon 22 Creek State Park 100,000 23 (B) Replacement of Bridge No.13-1201 24 over Valley Road Entrance in 25 Raccoon Creek State Park 250,000 26 (C) Replacement of Bridge No.13-1203 27 over Mineral Springs Road in 28 Raccoon Creek State Park 122,000 29 (D) Replacement of Bridge No.13-1204 30 over Service Yard in Raccoon Creek 19990S0504B0514 - 484 -
1 State Park 109,000 2 (E) Replacement of Bridge No.13-1206 3 over Main Road West of Office in 4 Raccoon Creek State Park 370,000 5 (F) Replacement of Bridge No.13-1209 6 over Main Road Near W.T. Plant in 7 Raccoon Creek State Park 480,000 8 (2) Bedford County 9 (A) Replacement of Bridge No.02-0101 10 over Whysong Bridge in Blue Knob 11 State Park 120,000 12 (B) Replacement of Bridge No.02-0103 13 over Camp No.2 Bridge in Blue Knob 14 State Park 109,000 15 (C) Replacement of Bridge No.02-0108 16 over Camp No.1 Service Road in Blue 17 Knob State Park 100,000 18 (D) Replacement of Bridge No.02-0109 19 over No.1 Campground in Blue Knob 20 State Park 85,000 21 (E) Replacement of Bridge No.02-0110 22 over Service Road in Blue Knob 23 State Park 100,000 24 (3) Berks County 25 (A) Replacement of Bridge No.06-0400 26 over Lenape Trail Bridge in French 27 Creek State Park 120,000 28 (B) Replacement of Bridge No.06-0402 29 over Scotts Run Lake South in 30 French Creek State Park 120,000 19990S0504B0514 - 485 -
1 (C) Replacement of Bridge No.11-0701 2 over Forester Road in Nolde Forest 3 E.E.C. 125,000 4 (D) Replacement of Bridge No.11-0702 5 over Forester Road in Nolde Forest 6 E.E.C. 110,000 7 (E) Replacement of Bridge No.11-0703 8 over Boulevard Trail in Nolde 9 Forest E.E.C. 135,000 10 (F) Replacement of Bridge No.11-0704 11 over Watershed Trail in Nolde 12 Forest E.E.C. 109,000 13 (G) Replacement of Bridge No.11-0705 14 over Cabin Hollow Road in Nolde 15 Forest E.E.C. 109,000 16 (4) Blair County 17 (A) Replacement of Bridge No.18-0300 18 over Pump House in Canoe Creek 19 State Park 130,000 20 (5) Bucks County 21 (A) Replacement of Bridge No.16-0900 22 over State Park Road in Ralph 23 Stover State Park 275,000 24 (B) Replacement of Bridge No.22-0600 25 over Service Road S.E. to Lake in 26 Nockamixon State Park 100,000 27 (C) Replacement of Bridge No.22-0601 28 over Park Service Road (S.E. Lake) 29 in Nockamixon State Park 109,000 30 (D) Replacement of Bridge No.22-0602 19990S0504B0514 - 486 -
1 over Park Service Road in 2 Nockamixon State Park 100,000 3 (E) Replacement of Bridge No.25-1201 4 over No.1 Lane Trail Bridge in 5 Tyler State Park 100,000 6 (F) Replacement of Bridge No.25-1202 7 over Mill Dairy Trail Bridge in 8 Tyler State Park 109,000 9 (G) Replacement of Bridge No.25-1203 10 over Mill Dairy Trail Bridge in 11 Tyler State Park 109,000 12 (H) Replacement of Bridge No.25-1206 13 over Dairy Hill Trail Bridge in 14 Tyler State Park 109,000 15 (I) Replacement of Bridge No.25-1207 16 over No.1 Lake Trail Bridge in 17 Tyler State Park 109,000 18 (J) Replacement of Bridge No.25-1208 19 over No.1 Lane Trail Entrance in 20 Tyler State Park 115,000 21 (K) Replacement of Bridge No.25-1210 22 over Biaker 2 Bridge in Tyler State 23 Park 250,000 24 (L) Replacement of Bridge No.25-1211 25 over Canoe Bridge Boat House in 26 Tyler State Park 225,000 27 (M) Replacement of Bridge No.50-0569 28 over Mill Creek Waste Gate in 29 Delaware Canal State Park 120,000 30 (N) Replacement of Bridge No.50-1017 19990S0504B0514 - 487 -
1 over Waste Gate in Delaware Canal 2 State Park 110,000 3 (O) Replacement of Bridge No.50-1469 4 over Dr. Summers Bridge in Delaware 5 Canal State Park 225,000 6 (P) Replacement of Bridge No.50-1523 7 over Waste Gate Woodside Avenue in 8 Delaware Canal State Park 100,000 9 (Q) Replacement of Bridge No.50-1594 10 over Mt. Eyre Waste Gate in 11 Delaware Canal State Park 120,000 12 (R) Replacement of Bridge No.50-1609 13 over Mt. Eyre Road Bridge in 14 Delaware Canal State Park 250,000 15 (S) Replacement of Bridge No.50-1634 16 over Milk House Camelback in 17 Delaware Canal State Park 250,000 18 (T) Replacement of Bridge No.50-1668 19 over Goat Farm Bridge in Delaware 20 Canal State Park 250,000 21 (U) Replacement of Bridge No.50-1912 22 over Buckstone Davids Library in 23 Delaware Canal State Park 250,000 24 (V) Replacement of Bridge No.50-2145 25 over Rossiters Bridge in Delaware 26 Canal State Park 250,000 27 (W) Replacement of Bridge No.50-2181 28 over Bowmans Hill Waste Gate in 29 Delaware Canal State Park 200,000 30 (X) Replacement of Bridge No.50-2374 19990S0504B0514 - 488 -
1 over Middle Union Mill Bridge in 2 Delaware Canal State Park 250,000 3 (Y) Replacement of Bridge No.50-2399 4 over Outlet Lock Bridge in Delaware 5 Canal State Park 165,000 6 (Z) Replacement of Bridge No.50-2423 7 over Dark Hollow Run Overflow in 8 Delaware Canal State Park 180,000 9 (AA) Replacement of Bridge No.50-2424 10 over Waste Gate Dark Hollow in 11 Delaware Canal State Park 112,000 12 (BB) Replacement of Bridge No.50-2470 13 over Ferry Street Bridge in 14 Delaware Canal State Park 300,000 15 (CC) Replacement of Bridge No.50-2613 16 over Phillips Mill Bridge in 17 Delaware Canal State Park 250,000 18 (DD) Replacement of Bridge No.50-2682 19 over Lower Limeport Bridge in 20 Delaware Canal State Park 250,000 21 (EE) Replacement of Bridge No.50-2721 22 over Upper Limeport Bridge in 23 Delaware Canal State Park 250,000 24 (FF) Replacement of Bridge No.50-2802 25 over Redfield Bridge in Delaware 26 Canal State Park 250,000 27 (GG) Replacement of Bridge No.50-2896 28 over Virginia Forest in Delaware 29 Canal State Park 250,000 30 (HH) Replacement of Bridge No.50-3047 19990S0504B0514 - 489 -
1 over Waste Gate over Lumberville in 2 Delaware Canal State Park 109,000 3 (II) Replacement of Bridge No.50-3100 4 over Lock 12 Bypass in Delaware 5 Canal State Park 100,000 6 (JJ) Replacement of Bridge No.50-3101 7 over Lumberville Lock 12 in 8 Delaware Canal State Park 150,000 9 (KK) Replacement of Bridge No.50-3206 10 over Waste Gate in Delaware Canal 11 State Park 112,000 12 (LL) Replacement of Bridge No.50-3235 13 over Waste Gate at Lock 13 in 14 Delaware Canal State Park 120,000 15 (MM) Replacement of Bridge No.50-3236 16 over Lock 13 Lock Bridge in 17 Delaware Canal State Park 120,000 18 (NN) Replacement of Bridge No.50-3254 19 over Waste Gate Whites Up Lock in 20 Delaware Canal State Park 125,000 21 (OO) Replacement of Bridge No.50-3394 22 over Smithtown Bridge 2 in Delaware 23 Canal State Park 125,000 24 (PP) Replacement of Bridge No.50-3517 25 over Smithtown Bridge 3 in Delaware 26 Canal State Park 200,000 27 (QQ) Replacement of Bridge NO.50-3557 28 over Waste Gate Kennys Lock in 29 Delaware Canal State Park 160,000 30 (RR) Replacement of Bridge No.50-3587 19990S0504B0514 - 490 -
1 over Smithtown Bridge 5 in Delaware 2 Canal State Park 225,000 3 (SS) Replacement of Bridge No.50-3617 4 over Lock 17 Stop Gate in Delaware 5 Canal State Park 140,000 6 (TT) Replacement of Bridge No.50-3618 7 over Lock 17 Bypass Gate in 8 Delaware Canal State Park 120,000 9 (UU) Replacement of Bridge No.50-3681 10 over Dark Hollow Waste Gate Bridge 11 in Delaware Canal State Park 140,000 12 (VV) Replacement of Bridge No.50-3718 13 over Tinicum Vehicle Bridge in 14 Delaware Canal State Park 160,000 15 (WW) Replacement of Bridge No.50-3736 16 over Overwrekks Waste Gate Bridge 17 in Delaware Canal State Park 140,000 18 (XX) Replacement of Bridge No.50-3925 19 over Dr. Dautzeig Bridge in 20 Delaware Canal State Park 120,000 21 (YY) Replacement of Bridge No.50-3939 22 over Farley Waste Gate in Delaware 23 Canal State Park 100,000 24 (ZZ) Replacement of Bridge No.50-4131 25 over Hazzard Camelback Bridge in 26 Delaware Canal State Park 250,000 27 (AAA) Replacement of Bridge No.50-4182 28 over Lodi Waste Gate Bridge in 29 Delaware Canal State Park 160,000 30 (BBB) Replacement of Bridge No.50-4236 19990S0504B0514 - 491 -
1 over Sphars Camelback Bridge in 2 Delaware Canal State Park 250,000 3 (CCC) Replacement of Bridge No.50-4270 4 over Gottlieb Bridge in Delaware 5 Canal State Park 250,000 6 (DDD) Replacement of Bridge No.50-4300 7 over Dillieo Bridge in Delaware 8 Canal State Park 250,000 9 (EEE) Replacement of Bridge No.50-4488 10 over Clark's Quarry Bridge in 11 Delaware Canal State Park 220,000 12 (FFF) Replacement of Bridge No.50-4565 13 over Overpeck's Bridge in Delaware 14 Canal State Park 250,000 15 (GGG) Replacement of Bridge No.50-4583 16 over Narrowsville Waste Gate in 17 Delaware Canal State Park 130,000 18 (HHH) Replacement of Bridge No.50-4673 19 over Lock 20 Bridge in Delaware 20 Canal State Park 160,000 21 (III) Replacement of Bridge No.50-4787 22 over Nicholas Bridge in Delaware 23 Canal State Park 250,000 24 (JJJ) Replacement of Bridge No.50-4860 25 over Trauger's Steel Camelback in 26 Delaware Canal State Park 250,000 27 (KKK) Replacement of Bridge No.50-4922 28 over Lock 21 Stop Gate in Delaware 29 Canal State Park 140,000 30 (6) Cambria County 19990S0504B0514 - 492 -
1 (A) Replacement of Bridge No.11-1100 2 over Beaver Dam Run (Spillway) in 3 Prince Gallitzin State Park 300,000 4 (7) Cameron County 5 (A) Replacement of Bridge No.23-1303 6 over Norcross Run in Sinnemahoning 7 State Park 135,000 8 (B) Replacement of Bridge No.24-1401 9 over West Cowley Run in Sizerville 10 State Park 120,000 11 (8) Carbon County 12 (A) Replacement of Bridge No.09-0501 13 over Section Bridge in Hickory Run 14 State Park 135,000 15 (B) Replacement of Bridge No.09-0502 16 over Disposal Plant Bridge in 17 Hickory Run State Park 132,000 18 (C) Replacement of Bridge No.09-0503 19 over Boulder Field Road Bridge in 20 Hickory Run State Park 130,000 21 (D) Replacement of Bridge No.09-0504 22 over Swimming Pool Bridge in 23 Hickory Run State Park 136,000 24 (E) Replacement of Bridge No.33-0100 25 over Oldmill Road/Sawmill Run in 26 Beltzville State Park 120,000 27 (F) Replacement of Bridge No.35-1400 28 over Lehigh Gorge State Park in 29 Lehigh Gorge State Park 250,000 30 (9) Centre County 19990S0504B0514 - 493 -
1 (A) Replacement of Bridge No.18-0900 2 over Main Park Road in Poe Valley 3 State Park 224,000 4 (B) Replacement of Bridge No.22-0900 5 over Camping Bridge in Greenwood 6 Furnace State Park 140,000 7 (10) Clearfield County 8 (A) Replacement of Bridge No.17-0801 9 over Campground Road in Parker Dam 10 State Park 220,000 11 (11) Clinton County 12 (A) Replacement of Bridge No.10-0600 13 over Main Park Road Entrance in 14 Hyner Run State Park 240,000 15 (B) Replacement of Bridge No.10-0601 16 over Hyner Run Road in Hyner Run 17 State Park 140,000 18 (12) Crawford County 19 (A) Replacement of Bridge No.26-1102 20 over Dam Overflow Bridge in 21 Pymatuning State Park 1,000,000 22 (B) Replacement of Bridge No.26-1103 23 over Dam Spillway Bridge in 24 Pymatuning State Park 1,539,000 25 (13) Cumberland County 26 (A) Replacement of Bridge No.10-1000 27 over Fuller Lake Dam Breast in Pine 28 Grove Furnace State Park 135,000 29 (14) Delaware County 30 (A) Replacement of Bridge No.27-1100 19990S0504B0514 - 494 -
1 over South of Pa.3 Entrance in 2 Ridley Creek State Park 140,000 3 (B) Replacement of Bridge No.27-1104 4 over Sycamore Mills Road in Park in 5 Ridley Creek State Park 130,000 6 (15) Erie County 7 (A) Replacement of Bridge No.20-1000 8 over Lagoon Bridge in Presque Isle 9 State Park 1,500,000 10 (B) Replacement of Bridge No.20-1101 11 over Misery BSY Bridge in Presque 12 Isle State Park 1,500,000 13 (16) Fayette County 14 (A) Replacement of Bridge No.11-0901 15 over Brunner Run Bridge in Ohiopyle 16 State Park 1,000,000 17 (17) Franklin County 18 (A) Replacement of Bridge No.03-0201 19 over Main Entrance Road in 20 Caledonia State Park 120,000 21 (B) Replacement of Bridge No.03-0202 22 over Main Entrance Road in 23 Caledonia State Park 200,000 24 (C) Replacement of Bridge No.23-0180 25 over End of Main Park Road in 26 Buchanan's Birthplace State Park 175,000 27 (18) Fulton County 28 (A) Replacement of Bridge No.05-0500 29 over Main Park Road in Cowan's Gap 30 State Park 190,000 19990S0504B0514 - 495 -
1 (19) Greene County 2 (A) Replacement of Bridge No.14-1300 3 over Iron Bridge Trail in Ryerson 4 Station State Park 500,000 5 (20) Huntingdon County 6 (A) Replacement of Bridge No.14-1300 7 over Upper Picnic Area in Trough 8 Creek State Park 334,000 9 (21) Luzerne County 10 (A) Replacement of Bridge No.17-1001 11 over Bridge No.2 Kitchen Creek in 12 Ricketts Glen State Park 130,000 13 (22) Lycoming County 14 (A) Replacement of Bridge No.14-0700 15 over Campground Road in Little Pine 16 State Park 424,000 17 (23) Mifflin County 18 (A) Replacement of Bridge No.21-1200 19 over Jack's Mountain Road in Reeds 20 Gap State Park 176,000 21 (B) Replacement of Bridge No.21-1201 22 over Service Road in Reeds Gap 23 State Park 100,000 24 (24) Montgomery County 25 (A) Replacement of Bridge No.34-1601 26 over Driveway in Evansburg State 27 Park 120,000 28 (B) Replacement of Bridge No.34-1602 29 over Service Road Bridge in 30 Evansburg State Park 175,000 19990S0504B0514 - 496 -
1 (C) Replacement of Bridge No.52-1500 2 over High Arch Bridge in Norristown 3 Farm Park 625,000 4 (D) Replacement of Bridge No.52-1501 5 over Meadow Bridge in Norristown 6 Farm Park 500,000 7 (E) Replacement of Bridge No.52-1502 8 over Lower Farm Road Bridge No.2 in 9 Norristown Farm Park 700,000 10 (F) Replacement of Bridge No.52-1503 11 over Lower Farm Road/Piggery Road 12 in Norristown Farm Park 125,000 13 (G) Replacement of Bridge No.52-1504 14 over Lower Farm Road/Stony Road in 15 Norristown Farm Park 1,500,000 16 (H) Replacement of Bridge No.52-1506 17 over Stanbridge Street Extension in 18 Norristown Farm Park 700,000 19 (I) Replacement of Bridge No.52-1507 20 over Small Railroad Bridge in 21 Norristown Farm Park 140,000 22 (25) Northampton County 23 (A) Replacement of Bridge No.07-0000 24 over Henry Homestead Bridge in 25 Jacobsburg E. E. Center 120,000 26 (B) Replacement of Bridge No.50-5135 27 over Rocky Falls Waste Gate in 28 Delaware Canal State Park 120,000 29 (C) Replacement of Bridge No.50-5371 30 over Raubsville P./S. Bridge in 19990S0504B0514 - 497 -
1 Delaware Canal State Park 200,000 2 (D) Replacement of Bridge No.50-5417 3 over Raubsville Camelback Bridge in 4 Delaware Canal State Park 200,000 5 (E) Replacement of Bridge No.50-5472 6 over Browns Terrace Bridge in 7 Delaware Canal State Park 200,000 8 (F) Replacement of Bridge No.50-5657 9 over Stop Gate Bridge 56.570 in 10 Delaware Canal State Park 250,000 11 (G) Replacement of Bridge No.50-5887 12 over Lock 24 East in Delaware Canal 13 State Park 160,000 14 (H) Replacement of Bridge No.50-5888 15 over Lock 24 Bridge in Delaware 16 Canal State Park 160,000 17 (I) Replacement of Bridge No.50-5889 18 over Lock 24 West in Delaware Canal 19 State Park 160,000 20 (26) Perry County 21 (A) Replacement of Bridge No.17-0803 22 over Maintenance Road in Little 23 Buffalo State Park 120,000 24 (27) Pike County 25 (A) Replacement of Bridge No.14-0800 26 over Big Inlet in Promised Land 27 State Park 130,000 28 (B) Replacement of Bridge No.14-0802 29 over Lower Lake Road in Promised 30 Land State Park 1,000,000 19990S0504B0514 - 498 -
1 (28) Somerset County 2 (A) Replacement of Bridge No.06-0400 3 over Main Road Bridge No.1 in 4 Kooser State Park 130,000 5 (B) Replacement of Bridge No.06-0401 6 over Main Road Bridge No.2 in 7 Kooser State Park 130,000 8 (C) Replacement of Bridge No.06-0402 9 over Van Dyke Picnic Area in Kooser 10 State Park 120,000 11 (D) Replacement of Bridge No.07-0503 12 over Main Road Forge Bridge No.1 in 13 Laurel Hill State Park 500,000 14 (E) Replacement of Bridge No.07-0505 15 over Main Road Jones Bridge No.2 in 16 Laurel Hill State Park 300,000 17 (29) Tioga County 18 (A) Replacement of Bridge No.09-0500 19 over Hills Creek Lake in Hills 20 Creek State Park 400,000 21 (30) Union County 22 (A) Replacement of Bridge No.20-1000 23 over Service Road to Beach in R.B. 24 Winter State Park 120,000 25 (31) Westmoreland County 26 (A) Replacement of Bridge No.05-0300 27 over Main Picnic Area in Keystone 28 State Park 100,000 29 (B) Replacement of Bridge No.08-0700 30 over Adams Falls Picnic Area in 19990S0504B0514 - 499 -
1 Linn Run State Park 140,000 2 (C) Replacement of Bridge No.08-0701 3 over Cabins 9 and 10 Access Road in 4 Linn Run State Park 160,000 5 Section 72.3. Statewide bicycle and pedestrian structures. 6 Rehabilitation, construction and demolition of 7 bridges and other crossing structures on bicycle 8 and pedestrian ways to be identified by the 9 Department of Conservation and Natural Resources 5,000,000 10 Section 73. Limitation on expenditure of funds. 11 Any moneys derived from the incurring of debt shall be used 12 solely for effecting the rehabilitation, replacement or removal 13 of bridges located on State highways or State forestry bridges. 14 All other bridge rehabilitation, replacement or removal shall be 15 financed and State bridge or State forestry bridge 16 rehabilitation, replacement or removal may also be financed from 17 current revenue. 18 Section 74. Debt authorization. 19 The Governor, Auditor General and State Treasurer are hereby 20 authorized and directed to borrow from time to time, in addition 21 to any authorization heretofore or hereafter enacted, on the 22 credit of the Commonwealth, subject to the limitations provided 23 in the current capital budget, money not exceeding in the 24 aggregate the sum of $1,485,147,000 as may be found necessary to 25 carry out the acquisition and construction of the State projects 26 specifically itemized in this act. 27 Section 75. Issue of bonds. 28 The indebtedness authorized in this act shall be incurred 29 from time to time and shall be evidenced by one or more series 30 of general obligation bonds of the Commonwealth in such 19990S0504B0514 - 500 -
1 aggregate principal amount for each series as the Governor, 2 Auditor General and State Treasurer shall determine, but the 3 latest stated maturity date shall not exceed 30 years from the 4 date of the bond first issued for each series. 5 Section 76. Estimated useful life of projects. 6 The General Assembly states the estimated useful life of the 7 projects itemized in this act as 30 years. 8 Section 77. Appropriation. 9 The net proceeds of the sale of the obligations authorized in 10 this act are hereby appropriated from the Capital Facilities 11 Fund to the department in the maximum amount of $1,485,147,000 12 to be used by it exclusively to defray the financial costs of 13 the State projects specifically itemized in this capital budget. 14 After reserving or paying the expenses of the sale of the 15 obligation, the State Treasurer shall pay out to the department 16 the moneys as required and certified by it to be legally due and 17 payable. 18 Section 78. Federal funds. 19 In addition to those funds appropriated in section 77, all 20 moneys received from the Federal Government for the public 21 improvement projects specifically itemized in this act are also 22 hereby appropriated for those projects. 23 Section 79. Allocation of funds. 24 (a) General rule.--Whenever the department or the Department 25 of Conservation and Natural Resources determines that the full 26 estimated financial costs of the projects itemized in this act 27 are not necessary for the proper design, acquisition or 28 construction of such projects, the excess funds no longer 29 required may be allocated by the department or the Department of 30 Conservation and Natural Resources to increase the estimated 19990S0504B0514 - 501 -
1 costs of any one or more of the projects specifically itemized 2 in a capital budget. 3 (b) Reimbursement of municipal expenditures.--Moneys raised 4 or expended by municipalities after the effective date of this 5 act, in anticipation of receipt of funds authorized for projects 6 itemized by this act, may be reimbursable to those 7 municipalities. 8 Section 80. Policy on jobs and materials. 9 (a) Jobs.--It is the declared policy of the Commonwealth 10 that the construction projects authorized in this act be used, 11 to the greatest extent possible, to provide for the creation of 12 jobs and the rehiring of the unemployed in this Commonwealth. In 13 order to reach this goal, firms with Commonwealth-based 14 facilities shall be actively solicited to make bids on contracts 15 to furnish products and materials, including, but not limited 16 to, steel and steel products, to be used in these projects. 17 (b) Materials.--Every contract document entered into to 18 undertake a project contained in this act shall provide that any 19 steel or other products to be used or supplied in the 20 performance of this contract shall be required to be 21 manufactured by plants in the United States unless the secretary 22 determines, on a contract by contract basis, that certain 23 required products are not produced in the United States in 24 sufficient quantities to meet the requirements of the contract. 25 Such a determination and the reasons therefor shall be published 26 in the Pennsylvania Bulletin. Decisions made under this 27 subsection shall not be inconsistent with the general provisions 28 of the act of March 3, 1978 (P.L.6, No.3), known as the Steel 29 Products Procurement Act. 30 (c) Minorities and women.--It is also the declared policy of 19990S0504B0514 - 502 -
1 the Commonwealth to require and encourage substantial 2 participation by minorities and women in the construction 3 projects authorized by this act. 4 Section 81. Payment of capital debt service. 5 The repayment of any debt incurred pursuant to this act shall 6 be made from the account and such repayment shall have first 7 claim on the revenues of the account. 8 Section 82. Authorization and debt cumulation. 9 The additional authorization and debt allowance provided for 10 in this act shall be added to the total authorizations and debt 11 incurred pursuant to the act of December 8, 1982 (P.L.848, 12 No.235), known as the Highway-Railroad and Highway Bridge 13 Capital Budget Act for 1982-1983, as amended and supplemented. 14 Section 83. Editorial changes. 15 In editing and preparing this act for printing following the 16 final enactment, the Legislative Reference Bureau shall insert 17 or revise letters or numbers for projects where the letters or 18 numbers are missing or require revision. The bureau shall also 19 revise the total monetary amounts for the total authorization, 20 debt authorization, appropriations and departmental totals as 21 necessary to agree with the total monetary amounts of the 22 projects. 23 Section 84. Effective date. 24 This act shall take effect immediately. B3L86RZ/19990S0504B0514 - 503 -