PRIOR PRINTER'S NO. 514 PRINTER'S NO. 1019
No. 504 Session of 1999
INTRODUCED BY STOUT AND MADIGAN, FEBRUARY 26, 1999
AS AMENDED ON THIRD CONSIDERATION, MAY 3, 1999
A SUPPLEMENT 1 To the act of December 8, 1982 (P.L.848, No.235), entitled "An 2 act providing for the adoption of capital projects related to 3 the repair, rehabilitation or replacement of highway bridges 4 to be financed from current revenue or by the incurring of 5 debt and capital projects related to highway and safety 6 improvement projects to be financed from current revenue of 7 the Motor License Fund," itemizing additional local and State 8 bridge projects. 9 The General Assembly of the Commonwealth of Pennsylvania 10 hereby enacts as follows: 11 Section 1. Short title. 12 This act shall be known and may be cited as the Highway- 13 Railroad and Highway Bridge Capital Budget Supplemental Act for 14 1999-2000. 15 Section 2. Definitions. 16 The following words and phrases when used in this act shall 17 have the meanings given to them in this section unless the 18 context clearly indicates otherwise: 19 "Account." The Highway Bridge Improvement Restricted Account 20 within the Motor License Fund.
1 "Capital project." A capital project as defined in section 2 1602-B of the act of April 9, 1929 (P.L.343, No.176), known as 3 The Fiscal Code, and shall include a county or municipal bridge 4 rehabilitation, replacement or improvement project as set forth 5 in this act. 6 "Department." The Department of Transportation of the 7 Commonwealth. 8 "Secretary." The Secretary of Transportation of the 9 Commonwealth. 10 Section 3. Total authorization for bridge projects. 11 (a) Total projects.--The total authorization for the costs <-- 12 (A) PROJECTS TO BE FINANCED BY THE INCURRING OF DEBT OR FROM <-- 13 THE ACCOUNT.-- 14 (1) TOTAL PROJECTS.--THE TOTAL AUTHORIZATION FOR THE 15 COSTS of the projects itemized pursuant to this act and to be 16 financed from current revenue or by the incurring of debt 17 shall be $1,894,222,000 $3,016,159,000. <-- 18 (b) State projects.--The authorization for capital projects <-- 19 (2) STATE PROJECTS.--THE AUTHORIZATION FOR CAPITAL <-- 20 PROJECTS in the category of highway bridge projects and 21 forestry and State park bridge projects to be constructed by 22 the Department of Transportation or the Department of <-- 23 Conservation and Natural Resources, or their, ITS successors <-- 24 or assigns, and to be financed by the incurring of debt or 25 from the highway account, itemized in this act under the <-- 26 category of State bridges, shall be $1,485,147,000 <-- 27 $2,092,894,000. 28 (c) Non-State projects.--The authorization for non-State <-- 29 (3) NON-STATE PROJECTS.--THE AUTHORIZATION FOR NON-STATE <-- 30 highway bridge projects to be constructed by municipalities 19990S0504B1019 - 2 -
1 and to be financed in part with grants not exceeding 80% of
2 the non-Federal share of the costs made to the local
3 government municipalities by the department from revenues
4 deposited in the account itemized in this act under the
5 category of local bridges, shall be $409,075,000 <--
6 $923,265,000.
7 (B) PROJECTS TO BE FINANCED BY OIL COMPANY FRANCHISE TAX <--
8 REVENUES.--
9 (1) STATE FORESTRY BRIDGE PROJECTS.--THE AUTHORIZATION
10 FOR CAPITAL PROJECTS IN THE CATEGORY OF STATE FORESTRY BRIDGE
11 PROJECTS TO BE CONSTRUCTED BY THE DEPARTMENT OF CONSERVATION
12 AND NATURAL RESOURCES, OR ITS SUCCESSORS OR ASSIGNS, AND TO
13 BE FINANCED BY OIL COMPANY FRANCHISE TAX REVENUES PURSUANT TO
14 75 PA.C.S. § 9502(A)(2)(IV) (RELATING TO IMPOSITION OF TAX),
15 ITEMIZED IN THIS ACT UNDER THE CATEGORY OF STATE FORESTRY
16 BRIDGE PROJECTS, SHALL BE $29,846,000.
17 (2) STATE PARK BRIDGE PROJECTS.--THE AUTHORIZATION FOR
18 CAPITAL PROJECTS IN THE CATEGORY OF STATE PARK BRIDGE
19 PROJECTS TO BE CONSTRUCTED BY THE DEPARTMENT OF CONSERVATION
20 AND NATURAL RESOURCES, OR ITS SUCCESSORS OR ASSIGNS, AND TO
21 BE FINANCED BY OIL COMPANY FRANCHISE TAX REVENUES PURSUANT TO
22 75 PA.C.S. § 9502(A)(2)(IV), ITEMIZED IN THIS ACT UNDER THE
23 CATEGORY OF STATE PARK BRIDGE PROJECTS, SHALL BE $32,591,000.
24 Section 4. Itemization of bridge projects.
25 The individual capital projects in the category of highway
26 projects to be constructed by the Department of Transportation,
27 its successors or assigns, and to be financed from current
28 revenue or by the incurring of debt are hereby itemized,
29 together with their estimated financial costs, in the following
30 sections.
19990S0504B1019 - 3 -
1 Section 5. Adams County. 2 (a) Local Bridges 3 (1) Cumberland Township, T-338, Herr's 4 Ridge Road Bridge over Willoughby Run, 5 Bridge Rehabilitation 170,000 6 (Base Construction Allocation - 7 $100,000) 8 (Land Allocation - $10,000) 9 (Design and Contingencies - $60,000) 10 (2) Cumberland Township, T-402, Horner 11 Road Bridge over Marsh Creek, County 12 Bridge No.111, Bridge Replacement 1,075,000 13 (Base Construction Allocation - 14 $725,000) 15 (Land Allocation - $25,000) 16 (Design and Contingencies - $325,000) 17 (3) Cumberland Township, T-417, Goulden 18 Road Bridge over Rock Creek, County 19 Bridge No.123, Bridge Rehabilitation 330,000 20 (Base Construction Allocation - 21 $250,000) 22 (Land Allocation - $5,000) 23 (Design and Contingencies - $75,000) 24 (4) Cumberland and Freedom Townships, T- 25 509, Sachs Mill Covered Bridge over 26 Marsh Creek, Pedestrian Bridge, Bridge 27 Rehabilitation 749,000 28 (Base Construction Allocation - 29 $698,000) 30 Design and Contingencies - $51,000 19990S0504B1019 - 4 -
1 (b) State Bridges (Reserved) <--
2 (B) STATE BRIDGES <--
3 (1) SR 3001, BRIDGE OVER MIDDLE CREEK,
4 FREEDOM TOWNSHIP, BRIDGE REPLACEMENT 876,000
5 (BASE CONSTRUCTION ALLOCATION -
6 $649,000)
7 (LAND ALLOCATION - $65,000)
8 (DESIGN AND CONTINGENCIES - $162,000)
9 (2) PA 234, BRIDGE OVER CONEWAGO CREEK,
10 ARENDTSVILLE BOROUGH, BRIDGE
11 REPLACEMENT 1,089,000
12 (BASE CONSTRUCTION ALLOCATION -
13 $806,000)
14 (LAND ALLOCATION - $81,000)
15 (DESIGN AND CONTINGENCIES - $202,000)
16 (3) PA 116, BRIDGE OVER WHITE RUN,
17 ARENDTSVILLE BOROUGH, BRIDGE
18 REPLACEMENT 602,000
19 (BASE CONSTRUCTION ALLOCATION -
20 $445,000)
21 (LAND ALLOCATION - $45,000)
22 (DESIGN AND CONTINGENCIES - $112,000)
23 (4) SR 3001, BRIDGE OVER BERMUDIAN CREEK,
24 HUNTINGTON TOWNSHIP, BRIDGE
25 REPLACEMENT 1,009,000
26 (BASE CONSTRUCTION ALLOCATION -
27 $747,000)
28 (LAND ALLOCATION - $75,000)
29 (DESIGN AND CONTINGENCIES - $187,000)
30 (5) PA 116, BRIDGE OVER MUDDY CREEK,
19990S0504B1019 - 5 -
1 HIGHLAND TOWNSHIP, BRIDGE REPLACEMENT 497,000 2 (BASE CONSTRUCTION ALLOCATION - 3 $368,000) 4 (LAND ALLOCATION - $37,000) 5 (DESIGN AND CONTINGENCIES - $92,000) 6 (6) PA 94, BRIDGE OVER BERMUDIAN CREEK, 7 LATIMORE TOWNSHIP, BRIDGE REPLACEMENT 550,000 8 (BASE CONSTRUCTION ALLOCATION - 9 $400,000) 10 (LAND ALLOCATION - $50,000) 11 (DESIGN AND CONTINGENCIES - $100,000) 12 Section 6. Allegheny County. 13 (a) Local Bridges 14 (1) Plum Borough, Mary Street Bridge over 15 Plum Creek, Bridge Replacement 630,000 16 (Base Construction Allocation - 17 $400,000) 18 (Land Allocation - $50,000) 19 (Design and Contingencies - $180,000) 20 (2) City of Pittsburgh, Glenwood Bridge, 21 Phase II over Monongahela River, Three 22 Railroads and Carson Street, Bridge 23 Rehabilitation 4,180,000 24 (Base Construction Allocation - 25 $3,905,000) 26 (Design and Contingencies - $275,000) 27 (3) Elizabeth Township, Patterson Road, 28 Boyd Hollow Bridge, Bridge Replacement 225,000 29 (Base Construction Allocation - 30 $180,000) 19990S0504B1019 - 6 -
1 (Land Allocation - $11,000) 2 (Design and Contingencies - $34,000) 3 (4) Elizabeth Township, Yates Street 4 Bridge, Bridge Replacement 198,000 5 (Base Construction Allocation - 6 $158,000) 7 (Land Allocation - $10,000) 8 (Design and Contingencies - $30,000) 9 (5) Shaler Township, South of Martha 10 Avenue, Anderson Road over Wible Run, 11 Bridge Replacement 500,000 12 (Base Construction Allocation - 13 $400,000) 14 (Design and Contingencies - $100,000) 15 (6) Baldwin Borough, Old Clairton Road 16 over CSX Railroad, Bridge 17 Rehabilitation 80,000 18 (Base Construction Allocation - 19 $65,000) 20 (Design and Contingencies - $15,000) 21 (7) Ben Avon Borough, Spruce Run Road over 22 Spruce Run, Bridge Rehabilitation 265,000 23 (Base Construction Allocation - 24 $200,000) 25 (Land Allocation - $5,000) 26 (Design and Contingencies - $60,000) 27 (8) City of Pittsburgh, Swinburne Street, 28 Bridge Painting 1,530,000 29 (Base Construction Allocation - 30 $1,500,000) 19990S0504B1019 - 7 -
1 (Design and Contingencies - $30,000) 2 (9) City of Pittsburgh, Railroad Bridge 3 (Hot Metal Bridge) at Former LTV Steel 4 Company over Monongahela River, Bridge 5 Rehabilitation 25,000,000 6 (Base Construction Allocation - 7 $22,500,000) 8 (Design and Contingencies - $2,500,000) 9 (10) Edgeworth Borough, Beaver Street over 10 Little Sewickley Creek, Bridge 11 Replacement 358,000 12 (Base Construction Allocation - 13 $250,000) 14 (Land Allocation - $8,000) 15 (Design and Contingencies - $100,000) 16 (11) Forward Township, Pangburn Hollow 17 Road over Pangburn Run, Bridge 18 Replacement 200,000 19 (Base Construction Allocation - 20 $150,000) 21 (Land Allocation - $10,000) 22 (Design and Contingencies - $40,000) 23 (12) Hampton Township, Duncan Avenue over 24 Pine Creek, Bridge Replacement 200,000 25 (Base Construction Allocation - 26 $150,000) 27 (Land Allocation - $10,000) 28 (Design and Contingencies - $40,000) 29 (13) Harrison Township, Natrona Road over 30 Small Branch of Allegheny River, Bridge 19990S0504B1019 - 8 -
1 Rehabilitation 210,000 2 (Base Construction Allocation - 3 $160,000) 4 (Land Allocation - $10,000) 5 (Design and Contingencies - $40,000) 6 (14) Jefferson Borough, Coal Valley Road 7 Bridge No.2 over McRoberts Run, Bridge 8 Rehabilitation 200,000 9 (Base Construction Allocation - 10 $150,000) 11 (Land Allocation - $10,000) 12 (Design and Contingencies - $40,000) 13 (15) Jefferson Borough, Coal Valley Road 14 Bridge No.4 over McRoberts Run, Bridge 15 Rehabilitation 200,000 16 (Base Construction Allocation - 17 $150,000) 18 (Land Allocation - $10,000) 19 (Design and Contingencies - $40,000) 20 (16) Leetsdale Borough, Beaver Road over 21 Big Sewickley Creek, Bridge 22 Replacement 420,000 23 (Base Construction Allocation - 24 $300,000) 25 (Land Allocation - $10,000) 26 (Design and Contingencies - $110,000) 27 (17) Municipality of Penn Hills, Mt. 28 Carmel Road over Sandy Creek, Bridge 29 Replacement 230,000 30 (Base Construction Allocation - 19990S0504B1019 - 9 -
1 $170,000) 2 (Land Allocation - $10,000) 3 (Design and Contingencies - $50,000) 4 (18) Municipality of Penn Hills, Lincoln 5 Road Bridge No.6 over Sandy Creek, 6 Bridge Replacement 215,000 7 (Base Construction Allocation - 8 $150,000) 9 (Land Allocation - $5,000) 10 (Design and Contingencies - $60,000) 11 (19) Municipality of Penn Hills, Lincoln 12 Road Bridge No.12 over Sandy Creek, 13 Bridge Replacement 215,000 14 (Base Construction Allocation - 15 $150,000) 16 (Land Allocation - $5,000) 17 (Design and Contingencies - $60,000) 18 (20) Sewickley Heights Borough, Blackburn 19 Road over Kilbuck Run, Bridge 20 Rehabilitation 145,000 21 (Base Construction Allocation - 22 $110,000) 23 (Land Allocation - $5,000) 24 (Design and Contingencies - $30,000) 25 (21) South Park Township, Sleepy Hollow 26 Road over Sleepy Hollow, Bridge 27 Replacement 295,000 28 (Base Construction Allocation - 29 $200,000) 30 (Land Allocation - $5,000) 19990S0504B1019 - 10 -
1 (Design and Contingencies - $90,000) 2 (22) South Park Township, Cochran's Mill 3 Road over Licks Run, Bridge 4 Replacement 215,000 5 (Base Construction Allocation - 6 $150,000) 7 (Land Allocation - $5,000) 8 (Design and Contingencies - $60,000) 9 (23) Hampton Township, T-357, Bridge over 10 Gourdhead Run, Bridge Rehabilitation 320,000 11 (Base Construction Allocation - 12 $280,000) 13 (Design and Contingencies - $40,000) 14 (24) Hampton Township, T-984, South 15 Pioneer Road Bridge No.1 over Crouse 16 Run, Bridge Rehabilitation 250,000 17 (Base Construction Allocation - 18 $210,000) 19 (Design and Contingencies - $40,000) 20 (25) Hampton Township, T-984, South 21 Pioneer Road Bridge No.2 over Crouse 22 Run, Bridge Rehabilitation 250,000 23 (Base Construction Allocation - 24 $210,000) 25 (Design and Contingencies - $40,000) 26 (26) Marshall Township, T-482, Northgate 27 Drive Bridge over Brush Creek, Bridge 28 Replacement 320,000 29 (Base Construction Allocation - 30 $280,000) 19990S0504B1019 - 11 -
1 (Land Allocation - $5,000) 2 (Design and Contingencies - $35,000) 3 (27) Town of McCandless, Blazier Drive 4 Bridge No.1 over Pine Creek, Bridge 5 Rehabilitation 17,000 6 (Base Construction Allocation - 7 $15,000) 8 (Design and Contingencies - $2,000) 9 (28) Town of McCandless, Blazier Drive 10 Bridge No.2 over Pine Creek, Bridge 11 Rehabilitation 28,000 12 (Base Construction Allocation - 13 $26,000) 14 (Design and Contingencies - $2,000) 15 (29) Town of McCandless, Blazier Drive 16 Bridge No.3 over Pine Creek, Bridge 17 Rehabilitation 3,000 18 (Base Construction Allocation - $2,000) 19 (Design and Contingencies - $1,000) 20 (30) Town of McCandless, Oakridge Drive 21 over Pine Creek, Bridge Rehabilitation 10,000 22 (Base Construction Allocation - $8,000) 23 (Design and Contingencies - $2,000) 24 (31) Town of McCandless, Meinert Road over 25 Pine Creek, Bridge Rehabilitation 3,000 26 (Base Construction Allocation - $2,000) 27 (Design and Contingencies - $1,000) 28 (32) Collier Township, Thom's Run Road- 29 Oakdale Road No.4 over Thom's Run, 30 Bridge Replacement 210,000 19990S0504B1019 - 12 -
1 (Base Construction Allocation - 2 $160,000) 3 (Land Allocation - $10,000) 4 (Design and Contingencies - $40,000) 5 (33) Collier Township, Thom's Run Road- 6 Oakdale Road No.5 over Thom's Run, 7 Bridge Replacement 210,000 8 (Base Construction Allocation - 9 $160,000) 10 (Land Allocation - $10,000) 11 (Design and Contingencies - $40,000) 12 (34) Collier Township, Thom's Run Road- 13 Oakdale Road No.9 over Thom's Run, 14 Bridge Replacement 180,000 15 (Base Construction Allocation - 16 $130,000) 17 (Land Allocation - $10,000) 18 (Design and Contingencies - $40,000) 19 (35) Etna Borough, Dewey Street over 20 Little Pine Creek, Bridge 21 Rehabilitation 23,000 22 (Base Construction Allocation - 23 $20,000) 24 (Design and Contingencies - $3,000) 25 (36) Forward Township, Roberts Hollow Road 26 over Fallen Timber Run, Bridge 27 Replacement 200,000 28 (Base Construction Allocation - 29 $160,000) 30 (Land Allocation - $10,000) 19990S0504B1019 - 13 -
1 (Design and Contingencies - $30,000) 2 (37) Hampton Township, Duncan Avenue over 3 Stillhouse Run, Bridge Replacement 230,000 4 (Base Construction Allocation - 5 $170,000) 6 (Land Allocation - $10,000) 7 (Design and Contingencies - $50,000) 8 (38) Penn Hills Township, Lincoln Road 9 over Ryans Run, Bridge Replacement 190,000 10 (Base Construction Allocation - 11 $140,000) 12 (Land Allocation - $10,000) 13 (Design and Contingencies - $40,000) 14 (39) Penns Hills Township, Lincoln Road 15 over Sandy Creek, Bridge Replacement 195,000 16 (Base Construction Allocation - 17 $150,000) 18 (Land Allocation - $5,000) 19 (Design and Contingencies - $40,000) 20 (40) North Versailles Township, Crooked 21 Run Road over Crooked Run, Bridge 22 Replacement 170,000 23 (Base Construction Allocation - 24 $130,000) 25 (Land Allocation - $10,000) 26 (Design and Contingencies - $30,000) 27 (41) O'Hara Township, Brownhill Road over 28 Little Pine Creek, Bridge Replacement 275,000 29 (Base Construction Allocation - 30 $231,000) 19990S0504B1019 - 14 -
1 (Design and Contingencies - $44,000) 2 (42) Ross Township, Thompson Run Road over 3 South Branch of Pine Creek, Bridge 4 Replacement 210,000 5 (Base Construction Allocation - 6 $160,000) 7 (Land Allocation - $8,000) 8 (Design and Contingencies - $42,000) 9 (43) Moon Township, T-114, Becks Run Road 10 over Flaugherty Run, Bridge 11 Replacement 420,000 12 (Base Construction Allocation - 13 $350,000) 14 (Land Allocation - $20,000) 15 (Design and Contingencies - $50,000) 16 (44) Homestead Borough, High Level Bridge, 17 Bridge Rehabilitation and Upgrade 250,000 18 (45) North Braddock Borough, Hawkins 19 Avenue Bridge, Bridge Rehabilitation 300,000 20 (46) Penn Hills Borough, Beechtree Road 21 Box Culvert Bridge, Bridge 22 Rehabilitation 100,000 23 (47) Whitaker Borough, Rankin Bridge, 24 Bridge Rehabilitation 100,000 25 (48) Swissvale Borough, Kenmaur Bridge 26 connecting Swissvale and Rankin, Bridge 27 Replacement 320,000 28 (Base Construction Allocation - 29 $270,000) 30 (Design and Contingencies - $50,000) 19990S0504B1019 - 15 -
1 (49) Wilkins Township, Brown Avenue Bridge 2 over Brown Run, Bridge Replacement 475,000 3 (Base Construction Allocation - 4 $380,000) 5 (Design and Contingencies - $95,000) 6 (50) Wilkins Township, Ivy Street Bridge 7 over Brown Run, Bridge Replacement 268,000 8 (Base Construction Allocation - 9 $214,000) 10 (Design and Contingencies - $54,000) 11 (51) Wilkins Township, Baker Street Bridge 12 over Chalfant Run, Bridge Replacement 205,000 13 (Base Construction Allocation - 14 $164,000) 15 (Design and Contingencies - $41,000) 16 (52) Upper St. Clair Township, Walther 17 Lane Bridge, Bridge Replacement 700,000 18 (Base Construction Allocation - 19 $650,000) 20 (Design and Contingencies - $50,000) 21 (53) Green Tree Borough, Trumball Drive 22 Bridge over Wheeling and Lake Erie 23 Railroad, Bridge Rehabilitation 575,000 24 (Base Construction Allocation - 25 $500,000) 26 (Design and Contingencies - $75,000) 27 (54) City of Pittsburgh, Fancourt Street 28 Bridge, Bridge Replacement 625,000 29 (Base Construction Allocation - 30 $500,000) 19990S0504B1019 - 16 -
1 (Design and Contingencies - $125,000) 2 (55) CITY OF PITTSBURGH, FORT WAYNE BRIDGE <-- 3 OVER ALLEGHENY RIVER, BRIDGE 4 REHABILITATION 100,000,000 5 (BASE CONSTRUCTION ALLOCATION - 6 $90,000,000) 7 (LAND ALLOCATION - $1,000,000) 8 (DESIGN AND CONTINGENCIES - $9,000,000) 9 (56) CITY OF PITTSBURGH, WABASH BRIDGE AT 10 STANWIX STREET OVER MONONGAHELA RIVER, 11 BRIDGE CONSTRUCTION 175,000,000 12 (BASE CONSTRUCTION ALLOCATION - 13 $150,000,000) 14 (LAND ALLOCATION - $10,000,000) 15 (DESIGN AND CONTINGENCIES - 16 $15,000,000) 17 (57) CITY OF PITTSBURGH, 18 NORTHSHORE/CENTRAL BUSINESS DISTRICT 19 BRIDGE OVER ALLEGHENY RIVER, BRIDGE 20 CONSTRUCTION 65,000,000 21 (BASE CONSTRUCTION ALLOCATION - 22 $50,000,000) 23 (LAND ALLOCATION - $10,000,000) 24 (DESIGN AND CONTINGENCIES - $5,000,000) 25 (58) CITY OF PITTSBURGH, AIRPORT 26 BUSWAY/HOV BRIDGE OVER OHIO RIVER 27 (BRUNOT ISLAND), BRIDGE CONSTRUCTION 185,000,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $150,000,000) 30 (LAND ALLOCATION - $20,000,000) 19990S0504B1019 - 17 -
1 (DESIGN AND CONTINGENCIES - 2 $15,000,000) 3 (59) CITY OF PITTSBURGH, SOUTH MILLVALE 4 STREET BRIDGE OVER EAST BUSWAY/CONRAIL, 5 BRIDGE REHABILITATION 5,000,000 6 (BASE CONSTRUCTION ALLOCATION - 7 $5,000,000) 8 (60) CARNEGIE BOROUGH, CARNEGIE PEDESTRIAN 9 MALL BRIDGE, CONVERSION FROM PEDESTRIAN 10 BRIDGE TO VEHICULAR BRIDGE 850,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $850,000) 13 (61) JEFFERSON BOROUGH, STATE STREET 14 BRIDGE RECONSTRUCTION 100,000 15 (BASE CONSTRUCTION ALLOCATION - 16 $100,000) 17 (b) State Bridges 18 (1) SR 0028, Etna Bridge, Northbound 19 Bridge No.4 to Existing SR 0028, Etna 20 Borough, Shaler Township, Sharpsburg 21 Borough and O'Hara Township, Bridge 22 Rehabilitation 7,415,000 23 (Base Construction Allocation - 24 $7,115,000) 25 (Land Allocation - $300,000) 26 (2) SR 0028, Etna Bridge to 62nd Street 27 Bridge, Etna Borough, Shaler Township, 28 Sharpsburg Borough and O'Hara Township, 29 Bridge Rehabilitation 17,222,000 30 (Base Construction Allocation - 19990S0504B1019 - 18 -
1 $17,022,000) 2 (Land Allocation - $200,000) 3 (3) SR 0030, Ardmore Westbound Electric 4 over SR 2112, Chalfant Borough, Bridge 5 Replacement 3,100,000 6 (Base Construction Allocation - 7 $3,000,000) 8 (Design and Contingencies - $100,000) 9 (4) SR 0030, Ardmore Eastbound Electric 10 over SR 2112, Chalfant Borough, Bridge 11 Replacement 2,500,000 12 (Base Construction Allocation - 13 $2,400,000) 14 (Design and Contingencies - $100,000) 15 (5) SR 0030, Ardmore Boulevard Bridge No.1 16 over Falls Run, North of SR 8012 17 Interchange, Forest Hills Borough, 18 Bridge Replacement 550,000 19 (Base Construction Allocation - 20 $400,000) 21 (Land Allocation - $50,000) 22 (Design and Contingencies - $100,000) 23 (6) SR 0048, Boston Hollow Road Bridge 24 over Unnamed Stream, North of Lincoln 25 Borough, Elizabeth Borough, Bridge 26 Replacement 340,000 27 (Base Construction Allocation - 28 $200,000) 29 (Land Allocation - $40,000) 30 (Design and Contingencies - $100,000) 19990S0504B1019 - 19 -
1 (7) SR 0050, Bridge over Chartiers Creek, 2 Northbound Lane, Heidelberg Borough, 3 Scott Township, Bridge Rehabilitation 3,750,000 4 (Base Construction Allocation - 5 $3,300,000) 6 (Land Allocation - $50,000) 7 (Design and Contingencies - $400,000) 8 (8) SR 0060, South Main Street Bridge over 9 Saw Mill Run, South of West End Circle, 10 City of Pittsburgh, Bridge Painting 178,000 11 (Base Construction Allocation - 12 $173,000) 13 (Design and Contingencies - $5,000) 14 (9) SR 0130, Tri-Borough Extended Bridge 15 over Patton Street at SR 8076 16 Interchange, Wilmerding Borough, Bridge 17 Rehabilitation 505,000 18 (Base Construction Allocation - 19 $400,000) 20 (Land Allocation - $30,000) 21 (Design and Contingencies - $75,000) 22 (10) SR 0148, Bridge over Crooked Run 23 Creek near SR 2037, White Oak Borough, 24 Bridge Replacement 350,000 25 (Base Construction Allocation - 26 $200,000) 27 (Land Allocation - $50,000) 28 (Design and Contingencies - $100,000) 29 (11) SR 0791, Bridge over Chalfont Run at 30 SR 2048, Wilkins Township, Bridge 19990S0504B1019 - 20 -
1 Replacement 450,000 2 (Base Construction Allocation - 3 $300,000) 4 (Land Allocation - $50,000) 5 (Design and Contingencies - $100,000) 6 (12) SR 0837, Northbound Ramp A to SR 0885 7 Southbound, City of Pittsburgh, Bridge 8 Rehabilitation 1,350,000 9 (Base Construction Allocation - 10 $1,250,000) 11 (Design and Contingencies - $100,000) 12 (13) SR 0978, Miller's Run Road Bridge 13 over Dolphin Run, South Fayette 14 Township, Bridge Replacement 300,000 15 (Base Construction Allocation - 16 $200,000) 17 (Design and Contingencies - $100,000) 18 (14) SR 1001, West 7th Avenue Bridge over 19 Bull Creek, Tarentum Borough, Bridge 20 Replacement 400,000 21 (Base Construction Allocation - 22 $300,000) 23 (Design and Contingencies - $100,000) 24 (15) SR 1011, Guys Run Road Bridge over 25 Guys Run, North of SR 0028, Harmar 26 Township, Bridge Replacement 350,000 27 (Base Construction Allocation - 28 $200,000) 29 (Land Allocation - $50,000) 30 (Design and Contingencies - $100,000) 19990S0504B1019 - 21 -
1 (16) SR 2001, Glassport-Elizabeth Road 2 Bridge over Burns Run, North of 3 Elizabeth Township, Lincoln Borough, 4 Bridge Replacement 350,000 5 (Base Construction Allocation - 6 $200,000) 7 (Land Allocation - $50,000) 8 (Design and Contingencies - $100,000) 9 (17) SR 2081, Turtle Creek-Monroeville 10 Road over US 22 Business, Monroeville 11 Borough, Bridge Replacement 1,060,000 12 (Base Construction Allocation - 13 $960,000) 14 (Design and Contingencies - $100,000) 15 (18) SR 2094, Jerome Street Bridge over SR 16 2027, Youghiogheny River, McKeesport 17 Borough, Bridge Rehabilitation 4,600,000 18 (Base Construction Allocation - 19 $4,500,000) 20 (Design and Contingencies - $100,000) 21 (19) SR 3066, Steubenville Pike Bridge 22 over US 22, North Fayette Township, 23 Bridge Rehabilitation 500,000 24 (Base Construction Allocation - 25 $400,000) 26 (Land Allocation - $25,000) 27 (Design and Contingencies - $75,000) 28 (20) SR 3069, Liberty Tunnel Airshaft 29 between SR 0051 and Liberty Bridge, 30 City of Pittsburgh, Airshaft 19990S0504B1019 - 22 -
1 Restoration 1,570,000 2 (Base Construction Allocation - 3 $1,370,000) 4 (Design and Contingencies - $200,000) 5 (21) SR 3104, McKees Rocks Sidewalk over 6 Harriet Street, McKees Rocks Borough, 7 Bridge Rehabilitation 6,800,000 8 (Base Construction Allocation - 9 $6,700,000) 10 (Design and Contingencies - $100,000) 11 (22) SR 4036, Big Sewickley Creek Road 12 over Big Sewickley Creek at SR 2003, 13 Bell Acres Borough, Bridge 14 Rehabilitation 500,000 15 (Base Construction Allocation - 16 $400,000) 17 (Land Allocation - $25,000) 18 (Design and Contingencies - $75,000) 19 (23) SR 8043, Southbound Ramp Bridge over 20 SR 0019 and SR 0065, City of 21 Pittsburgh, Bridge Rehabilitation 2,400,000 22 (Base Construction Allocation - 23 $2,100,000) 24 (Land Allocation - $50,000) 25 (Design and Contingencies - $250,000) 26 (24) SR 8045, Ramp at Stadium over SR 0065 27 and Stadium Drive, City of Pittsburgh, 28 Bridge Rehabilitation 600,000 29 (Base Construction Allocation - 30 $600,000) 19990S0504B1019 - 23 -
1 (25) SR 8049, SR 0019 Bridge Ramp, Chateau 2 Street to SR 0019, City of Pittsburgh, 3 Bridge Rehabilitation 2,350,000 4 (Base Construction Allocation - 5 $2,000,000) 6 (Land Allocation - $50,000) 7 (Design and Contingencies - $300,000) 8 (26) SR 8049, Bridge Ramp from SR 0065 9 Northbound to SR 0019, City of 10 Pittsburgh, Bridge Rehabilitation 2,850,000 11 (Base Construction Allocation - 12 $2,500,000) 13 (Land Allocation - $50,000) 14 (Design and Contingencies - $300,000) 15 (27) SR 8049, I-279 Bridge Ramp to SR 0065 16 Northbound, City of Pittsburgh, Bridge 17 Rehabilitation 1,730,000 18 (Base Construction Allocation - 19 $1,500,000) 20 (Land Allocation - $30,000) 21 (Design and Contingencies - $200,000) 22 (28) SR 0030, Ardmore Boulevard Bridge 23 No.2 over Falls Run, North of SR 8012 24 Interchange, Forest Hills Borough, 25 Bridge Replacement 550,000 26 (Base Construction Allocation - 27 $400,000) 28 (Land Allocation - $50,000) 29 (Design and Contingencies - $100,000) 30 (29) SR 3004, McLaughlin Road Bridge over 19990S0504B1019 - 24 -
1 McLaughlin Run, Bridgeville Borough, 2 Bridge Replacement 227,000 3 (Base Construction Allocation - 4 $177,000) 5 (Land Allocation - $10,000) 6 (Design and Contingencies - $40,000) 7 (30) SR 0028, Northbound Bridge over 8 Pennsylvania Turnpike, Harmar Township, 9 Bridge Rehabilitation 344,000 10 (Base Construction Allocation - 11 $314,000) 12 (Design and Contingencies - $30,000) 13 (31) SR 0028, Southbound Bridge over 14 Pennsylvania Turnpike, Harmar Township, 15 Bridge Rehabilitation 356,000 16 (Base Construction Allocation - 17 $325,000) 18 (Design and Contingencies - $31,000) 19 (32) SR 0028, Northbound Bridge over SR 20 1028, Harrison Township, Bridge 21 Rehabilitation 106,000 22 (Base Construction Allocation - 23 $97,000) 24 (Design and Contingencies - $9,000) 25 (33) SR 0028, Southbound Bridge over SR 26 1028, Harrison Township, Bridge 27 Rehabilitation 105,000 28 (Base Construction Allocation - 29 $96,000) 30 (Design and Contingencies - $9,000) 19990S0504B1019 - 25 -
1 (34) SR 0050, Washington Avenue Bridge 2 over Chartiers Creek, Bridgeville 3 Borough, Bridge Rehabilitation 119,000 4 (Base Construction Allocation - 5 $109,000) 6 (Design and Contingencies - $10,000) 7 (35) SR 0051, Clairton Boulevard Bridge 8 over Lewis Run, Pleasant Hills Borough, 9 Bridge Replacement 600,000 10 (Base Construction Allocation - 11 $500,000) 12 (Design and Contingencies - $100,000) 13 (36) SR 0065, Ohio River Boulevard Bridge 14 over Forest Avenue, Ben Avon Borough, 15 Bridge Replacement 396,000 16 (Base Construction Allocation - 17 $360,000) 18 (Design and Contingencies - $36,000) 19 (37) SR 0065, Bridge over Ramps, Railroad 20 and Chateau Street, City of Pittsburgh, 21 Bridge Rehabilitation 13,284,000 22 (Base Construction Allocation - 23 $12,784,000) 24 (Design and Contingencies - $500,000) 25 (38) SR 0079, Neville Island Bridge over 26 Ohio River, Neville Township, Bridge 27 Rehabilitation 12,700,000 28 (Base Construction Allocation - 29 $11,200,000) 30 (Design and Contingencies - $1,500,000) 19990S0504B1019 - 26 -
1 (39) SR 0088, Library Road Bridge No.1 2 over Piney Fork Creek, Bethel Park 3 Borough, Bridge Replacement 161,000 4 (Base Construction Allocation - 5 $128,000) 6 (Land Allocation - $20,000) 7 (Design and Contingencies - $13,000) 8 (40) SR 0088, Library Road Bridge No.2 9 over Branch of Piney Fork Creek, Bethel 10 Park Borough, Bridge Replacement 161,000 11 (Base Construction Allocation - 12 $128,000) 13 (Land Allocation - $20,000) 14 (Design and Contingencies - $13,000) 15 (41) SR 0885, Mifflin Road Bridge over 16 Branch of Streets Run, City of 17 Pittsburgh, Bridge Replacement 600,000 18 (Base Construction Allocation - 19 $500,000) 20 (Design and Contingencies - $100,000) 21 (42) SR 0910, Gibsonia Road Bridge over 22 Rawlins Run, Indiana Township, Bridge 23 Deck Replacement 132,000 24 (Base Construction Allocation - 25 $120,000) 26 (Design and Contingencies - $12,000) 27 (43) SR 1027, Pleasantville Road Bridge 28 over Little Bull Creek, Harrison 29 Township, Bridge Replacement 400,000 30 (Base Construction Allocation - 19990S0504B1019 - 27 -
1 $300,000) 2 (Design and Contingencies - $100,000) 3 (44) SR 1032, Burtner Road Bridge over 4 Little Bull Creek, Harrison Township, 5 Bridge Deck Replacement 198,000 6 (Base Construction Allocation - 7 $180,000) 8 (Design and Contingencies - $18,000) 9 (45) SR 2008, Lovedale Road Bridge over 10 Wylie Run Creek, Elizabeth Township, 11 Bridge Replacement 430,000 12 (Base Construction Allocation - 13 $300,000) 14 (Land Allocation - $30,000) 15 (Design and Contingencies - $100,000) 16 (46) SR 2017, Pineview Drive Bridge No.1 17 over Gillespie Run, Elizabeth Township, 18 Bridge Deck Replacement 255,000 19 (Base Construction Allocation - 20 $135,000) 21 (Land Allocation - $20,000) 22 (Design and Contingencies - $100,000) 23 (47) SR 2017, Pineview Drive Bridge No.2 24 over Gillespie Run, Elizabeth Township, 25 Bridge Deck Replacement 243,000 26 (Base Construction Allocation - 27 $123,000) 28 (Land Allocation - $20,000) 29 (Design and Contingencies - $100,000) 30 (48) SR 2018, West Smithfield Road Bridge 19990S0504B1019 - 28 -
1 over Unnamed Creek, Elizabeth Township, 2 Bridge Deck Replacement 218,000 3 (Base Construction Allocation - 4 $118,000) 5 (Design and Contingencies - $100,000) 6 (49) SR 2031, Lincoln Way Bridge over Long 7 Run, White Oak Borough, Bridge 8 Replacement 600,000 9 (Base Construction Allocation - 10 $500,000) 11 (Design and Contingencies - $100,000) 12 (50) SR 2051, Brinton Road Bridge over I- 13 376, Edgewood Borough, Bridge 14 Rehabilitation 996,000 15 (Base Construction Allocation - 16 $846,000) 17 (Design and Contingencies - $150,000) 18 (51) SR 4019, Mount Royal Boulevard Bridge 19 over Pine Creek, Hampton Township, 20 Bridge Rehabilitation 94,000 21 (Base Construction Allocation - 22 $89,000) 23 (Design and Contingencies - $5,000) 24 (52) SR 4043, Big Sewickley Road Bridge 25 over Branch of Big Sewickley Creek, 26 Franklin Park Borough, Bridge 27 Replacement 84,000 28 (Base Construction Allocation - 29 $76,000) 30 (Design and Contingencies - $8,000) 19990S0504B1019 - 29 -
1 (53) SR 8002, Crosstown Boulevard Bridge 2 over Forbes and Diamond Street and 3 Ramps, City of Pittsburgh, Bridge 4 Painting 310,000 5 (Base Construction Allocation - 6 $300,000) 7 (Design and Contingencies - $10,000) 8 (54) SR 8002, Ramp L Road Bridge over 9 Forbes and Diamond Streets, City of 10 Pittsburgh, Bridge Painting 110,000 11 (Base Construction Allocation - 12 $100,000) 13 (Design and Contingencies - $10,000) 14 (55) SR 8015, Ramp D Road Bridge over Ohio 15 River Back Channel, Neville Township, 16 Bridge Rehabilitation 800,000 17 (Base Construction Allocation - 18 $700,000) 19 (Design and Contingencies - $100,000) 20 (56) SR 8015, Ramp E Road Bridge over PC&Y 21 Railroad, Neville Township, Bridge 22 Rehabilitation 670,000 23 (Base Construction Allocation - 24 $500,000) 25 (Design and Contingencies - $170,000) 26 (57) SR 8015, I-79 Ramp H Bridge over PC&Y 27 Railroad, Neville Township, Bridge 28 Rehabilitation 700,000 29 (Base Construction Allocation - 30 $600,000) 19990S0504B1019 - 30 -
1 (Design and Contingencies - $100,000) 2 (58) SR 8015, Ramp J Road Bridge over 3 Neville Road, Neville Township, Bridge 4 Rehabilitation 220,000 5 (Base Construction Allocation - 6 $200,000) 7 (Design and Contingencies - $20,000) 8 (59) SR 8017, Ramp B2 Road Bridge over SR 9 4025 and SR 4033, Glenfield Borough, 10 Bridge Rehabilitation 110,000 11 (Base Construction Allocation - 12 $100,000) 13 (Design and Contingencies - $10,000) 14 (60) SR 8017, Ramp B Road Bridge over Ramp 15 A and SR 4033, Glenfield Borough, 16 Bridge Rehabilitation 120,000 17 (Base Construction Allocation - 18 $110,000) 19 (Design and Contingencies - $10,000) 20 (61) SR 8017, Ramp B1 Road Bridge over SR 21 0065 Ramps A1 and R, Glenfield Borough, 22 Bridge Rehabilitation 165,000 23 (Base Construction Allocation - 24 $150,000) 25 (Design and Contingencies - $15,000) 26 (62) SR 8017, Ramp A Road Bridge over Ramp 27 B3, Glenfield Borough, Bridge 28 Rehabilitation 110,000 29 (Base Construction Allocation - 30 $100,000) 19990S0504B1019 - 31 -
1 (Design and Contingencies - $10,000) 2 (63) SR 0028, Etna Bridges, Phase III, 3 Northbound Bridge No.4 to Existing SR 4 0028, Two Structures, Etna and 5 Sharpsburg Boroughs, Bridge 6 Rehabilitation 6,300,000 7 (Base Construction Allocation - 8 $6,000,000) 9 (Land Allocation - $300,000) 10 (64) SR 0028, Etna Bridge, Phase II, 11 Southbound Bridge No.3 and Northbound 12 Bridge for SR 0008 Connection, Etna and 13 Sharpsburg Boroughs and Shaler 14 Township, Bridge Rehabilitation 13,200,000 15 (Base Construction Allocation - 16 $12,200,000) 17 (Land Allocation - $1,000,000) 18 (65) SR 2013, Monessen-Elizabeth Road 19 Bridge over Becketts Run, Forward 20 Township, Bridge Replacement 450,000 21 (Base Construction Allocation - 22 $300,000) 23 (Land Allocation - $50,000) 24 (Design and Contingencies - $100,000) 25 (66) SR 2016, Jefferson Heights Road 26 Bridge over I-376, Wilkins Township, 27 Bridge Reconstruction 1,600,000 28 (Base Construction Allocation - 29 $1,200,000) 30 (Design and Contingencies - $400,000) 19990S0504B1019 - 32 -
1 (67) SR 0008, Bridge over Allegheny River 2 and Conrail, City of Pittsburgh, Bridge 3 Painting 333,000 4 (Base Construction Allocation - 5 $333,000) 6 (68) SR 0028, Allegheny Valley Expressway 7 Bridge, Southbound over Burtner Road, 8 Harrison Township, Bridge 9 Rehabilitation 170,000 10 (Base Construction Allocation - 11 $165,000) 12 (Design and Contingencies - $5,000) 13 (69) SR 0028, Allegheny Valley Expressway 14 Bridge, Northbound over Burtner Road, 15 Harrison Township, Bridge 16 Rehabilitation 320,000 17 (Base Construction Allocation - 18 $315,000) 19 (Design and Contingencies - $5,000) 20 (70) SR 0028, Allegheny Valley Expressway 21 Bridge, Northbound over Bull Creek 22 Road, Tarentum Borough, Bridge 23 Rehabilitation 120,000 24 (Base Construction Allocation - 25 $115,000) 26 (Design and Contingencies - $5,000) 27 (71) SR 0028, Allegheny Valley Expressway 28 Bridge, Southbound over Bull Creek 29 Road, Tarentum Borough, Bridge 30 Rehabilitation 120,000 19990S0504B1019 - 33 -
1 (Base Construction Allocation - 2 $115,000) 3 (Design and Contingencies - $5,000) 4 (72) SR 0028, Allegheny Valley Expressway, 5 Bridge over Scout Reservation Road, 6 Sharpesburg Borough, Bridge 7 Rehabilitation 1,000,000 8 (Base Construction Allocation - 9 $850,000) 10 (Design and Contingencies - $150,000) 11 (73) SR 0079, Glenfield Bridge over Ramp A 12 and SR 4033, Glenfield Borough, Bridge 13 Rehabilitation 748,000 14 (Base Construction Allocation - 15 $681,000) 16 (Design and Contingencies - $67,000) 17 (74) SR 0079, I-79 Bridge Northbound over 18 Turnpike, Marshall Township, Bridge 19 Painting 278,000 20 (Base Construction Allocation - 21 $268,000) 22 (Design and Contingencies - $10,000) 23 (75) SR 0079, I-79 Bridge Southbound over 24 Turnpike, Marshall Township, Bridge 25 Painting 228,000 26 (Base Construction Allocation - 27 $218,000) 28 (Design and Contingencies - $10,000) 29 (76) SR 0079, I-79 Neville Island Bridge 30 over Ohio River, Neville Township, 19990S0504B1019 - 34 -
1 Bridge Rehabilitation 12,945,000 2 (Base Construction Allocation - 3 $11,200,000) 4 (Land Allocation - $200,000) 5 (Design and Contingencies - $1,545,000) 6 (77) SR 0121, Greentree Road Bridge over 7 I-279, Parkway West, Greentree Borough, 8 Bridge Painting 192,000 9 (Base Construction Allocation - 10 $165,000) 11 (Land Allocation - $10,000) 12 (Design and Contingencies - $17,000) 13 (78) SR 0376, I-376 Bridge Eastbound over 14 Haymaker Road, Monroeville Borough, 15 Bridge Painting 266,000 16 (Base Construction Allocation - 17 $256,000) 18 (Design and Contingencies - $10,000) 19 (79) SR 0376, I-376 Bridge Westbound over 20 Haymaker Road, Monroeville Borough, 21 Bridge Painting 155,000 22 (Base Construction Allocation - 23 $145,000) 24 (Design and Contingencies - $10,000) 25 (80) SR 0400, SR 0400, SR 4019 and SR 4042 26 Bridges, Structure Painting, Franklin 27 Park Borough, Hampton Township and 28 Pittsburgh, Bridge Painting 520,000 29 (Base Construction Allocation - 30 $500,000) 19990S0504B1019 - 35 -
1 (Design and Contingencies - $20,000) 2 (81) SR 0366, Tarentum Bridge over 3 Allegheny River, Tarentum Borough, 4 Bridge Rehabilitation 4,105,000 5 (Base Construction Allocation - 6 $3,665,000) 7 (Design and Contingencies - $440,000) 8 (82) SR 0837, Eighth Avenue Bridge over 9 Baldwin Road, West Homestead Borough, 10 Bridge Replacement 2,529,000 11 (Base Construction Allocation - 12 $2,258,000) 13 (Design and Contingencies - $271,000) 14 (83) SR 3078, Burgettstown Road Bridge 15 over Potato Garden Road, Findley 16 Township, Bridge Replacement 148,000 17 (Base Construction Allocation - 18 $120,000) 19 (Land Allocation - $10,000) 20 (Design and Contingencies - $18,000) 21 (84) SR 1010, Hart's Run Road Bridge over 22 Branch of Hart's Run, Hampton Township, 23 Bridge Replacement 520,000 24 (Base Construction Allocation - 25 $400,000) 26 (Land Allocation - $20,000) 27 (Design and Contingencies - $100,000) 28 (85) SR 1040, Bakerstown Road Bridge over 29 Route 28, Tarentum Borough, Bridge 30 Rehabilitation 275,000 19990S0504B1019 - 36 -
1 (Base Construction Allocation - 2 $270,000) 3 (Design and Contingencies - $5,000) 4 (86) SR 2065, Thompson Run Road Bridge 5 over Union Railroad, Monroeville 6 Borough, Bridge Replacement 550,000 7 (Base Construction Allocation - 8 $500,000) 9 (Design and Contingencies - $50,000) 10 (87) SR 2074, Hulton Road Bridge over 11 Caldwell Run, Penn Hills, Bridge 12 Replacement 117,000 13 (Base Construction Allocation - 14 $84,000) 15 (Land Allocation - $20,000) 16 (Design and Contingencies - $13,000) 17 (88) SR 2080, Plum Avenue Bridge over Plum 18 Creek, Oakmont Borough, Bridge 19 Painting 109,000 20 (Base Construction Allocation - 21 $99,000) 22 (Design and Contingencies - $10,000) 23 (89) SR 2082, Hulton Bridge over Conrail 24 and Allegheny River, Oakmont Borough 25 and Harmar Township, Bridge 26 Rehabilitation 550,000 27 (Base Construction Allocation - 28 $450,000) 29 (Design and Contingencies - $100,000) 30 (90) SR 2084, Milltown Road Bridge over 19990S0504B1019 - 37 -
1 Plum Creek, Penn Hills, Bridge 2 Painting 31,000 3 (Base Construction Allocation - 4 $26,000) 5 (Design and Contingencies - $5,000) 6 (91) SR 2085, Birmingham Bridge over Mon 7 River, CSX Railroad, City of 8 Pittsburgh, Bridge Rehabilitation 1,455,000 9 (Base Construction Allocation - 10 $1,200,000) 11 (Land Allocation - $5,000) 12 (Design and Contingencies - $250,000) 13 (92) SR 2114, Bowman Avenue Bridge over SR 14 1066, RPS G & E, Cliff Street, City of 15 McKeesport, Bridge Rehabilitation 300,000 16 (Base Construction Allocation - 17 $260,000) 18 (Design and Contingencies - $40,000) 19 (93) SR 3005, Mayview Road Bridge over 20 Branch Chartiers Creek, South Fayette 21 Township, Bridge Replacement 400,000 22 (Base Construction Allocation - 23 $320,000) 24 (Land Allocation - $20,000) 25 (Design and Contingencies - $60,000) 26 (94) SR 3007, Walton Road Bridge over 27 Branch of Lobbs Run, Jefferson Borough, 28 Bridge Replacement 93,000 29 (Base Construction Allocation - 30 $63,000) 19990S0504B1019 - 38 -
1 (Land Allocation - $20,000) 2 (Design and Contingencies - $10,000) 3 (95) SR 3069, Liberty Bridge and Approach 4 Ramps, Six Structures, City of 5 Pittsburgh, Bridge Painting 1,000,000 6 (Base Construction Allocation - 7 $900,000) 8 (Design and Contingencies - $100,000) 9 (96) SR 3104, Bridge over Ohio River, City 10 of Pittsburgh, Bridge Painting 960,000 11 (Base Construction Allocation - 12 $950,000) 13 (Design and Contingencies - $10,000) 14 (97) SR 4003, McKnight Road Bridge over 15 Branch Pine Creek, Culvert Repair, 16 McCandless Township, Bridge 17 Replacement 978,000 18 (Base Construction Allocation - 19 $850,000) 20 (Design and Contingencies - $128,000) 21 (98) SR 4025, Bridge over Ohio River, 22 Sewickley Borough, Bridge Painting 610,000 23 (Base Construction Allocation - 24 $600,000) 25 (Design and Contingencies - $10,000) 26 (99) SR 8037, Bridge and Ramp over Saw 27 Mill Run, City of Pittsburgh, Bridge 28 Painting 584,000 29 (Base Construction Allocation - 30 $564,000) 19990S0504B1019 - 39 -
1 (Design and Contingencies - $20,000) 2 (100) SR 0279, Fort Pitt Bridge over 3 Monongahela River, City of Pittsburgh, 4 Bridge Rehabilitation 1,800,000 5 (Base Project Allocation - $1,800,000) 6 (101) VARIOUS BRIDGES, ALLEGHENY AND <-- 7 BEAVER COUNTIES, BRIDGE REHABILITATION 8,000,000 8 (BASE CONSTRUCTION ALLOCATION - 9 $7,200,000) 10 (DESIGN AND CONTINGENCIES - $800,000) 11 Section 7. Armstrong County. 12 (a) Local Bridges 13 (1) Boggs Township, T-850, Scrubgrass 14 Bridge over Scrubgrass Creek, Bridge 15 Rehabilitation 230,000 16 (Base Construction Allocation - 17 $170,000) 18 (Land Allocation - $10,000) 19 (Design and Contingencies - $50,000) 20 (2) Boggs Township, T-632, Scrubgrass 21 Bridge No.2 over Scrubgrass Creek, 22 Bridge Rehabilitation 185,000 23 (Base Construction Allocation - 24 $150,000) 25 (Land Allocation - $10,000) 26 (Design and Contingencies - $25,000) 27 (3) Boggs Township, T-821, Pine Creek 28 Bridge over North Fork of Pine Creek, 29 Bridge Rehabilitation 140,000 30 (Base Construction Allocation - 19990S0504B1019 - 40 -
1 $100,000) 2 (Land Allocation - $10,000) 3 (Design and Contingencies - $30,000) 4 (4) North Buffalo Township, T-300, Blaine 5 Bridge over Buffalo Creek, Bridge 6 Replacement 500,000 7 (Base Construction Allocation - 8 $400,000) 9 (Land Allocation - $20,000) 10 (Design and Contingencies - $80,000) 11 (5) North Buffalo Township, T-414, Church 12 Road Bridge over Stream, Bridge 13 Replacement 150,000 14 (Base Construction Allocation - 15 $100,000) 16 (Land Allocation - $10,000) 17 (Design and Contingencies - $40,000) 18 (6) West Kittanning Borough, T-759, Bridge 19 over Stream, Bridge Replacement 325,000 20 (Base Construction Allocation - 21 $265,000) 22 (Land Allocation - $10,000) 23 (Design and Contingencies - $50,000) 24 (7) Manorville Borough, Manorville 25 Railroad Bridge along Former Conrail 26 Right-of-Way, Bridge Removal 65,000 27 (Base Construction Allocation - 28 $55,000) 29 (Design and Contingencies - $10,000) 30 (8) Pine Township, Templeton Bridge along 19990S0504B1019 - 41 -
1 Former Conrail Right-of-Way, Bridge 2 Removal 75,000 3 (Base Construction Allocation - 4 $65,000) 5 (Design and Contingencies - $10,000) 6 (b) State Bridges 7 (1) SR 0028, Buffalo Creek Bridge over 8 Buffalo Creek and Conrail, South 9 Buffalo Township, Bridge Painting 3,010,000 10 (Base Construction Allocation - 11 $3,000,000) 12 (Design and Contingencies - $10,000) 13 (2) SR 3023, Iron Bridge Road, Pine Run 14 Bridge Replacement, South Buffalo 15 Township, Bridge Replacement 550,000 16 (Base Construction Allocation - 17 $510,000) 18 (Land Allocation - $20,000) 19 (Design and Contingencies - $20,000) 20 (3) SR 0156, Long Run Bridge over Long 21 Run, Kiskiminetas Township, Bridge 22 Painting 75,000 23 (Base Construction Allocation - 24 $60,000) 25 (Design and Contingencies - $15,000) 26 (4) SR 0422, US 422 Eastbound Overpass 27 Bridge over SR 0028, East Franklin 28 Township, Bridge Painting 190,000 29 (Base Construction Allocation - 30 $175,000) 19990S0504B1019 - 42 -
1 (Design and Contingencies - $15,000) 2 (5) SR 0422, US 422 Westbound Overpass 3 Bridge over SR 0028, East Franklin 4 Township, Bridge Painting 190,000 5 (Base Construction Allocation - 6 $175,000) 7 (Design and Contingencies - $15,000) 8 (6) SR 1028, Oscar Bridge over Pine Creek, 9 Boggs Township, Bridge Painting 95,000 10 (Base Construction Allocation - 11 $80,000) 12 (Design and Contingencies - $15,000) 13 (7) SR 0028, Buffalo Creek Bridge over 14 Buffalo Creek, South Buffalo Township, 15 Bridge Painting 1,730,000 16 (Base Construction Allocation - 17 $1,700,000) 18 (Design and Contingencies - $30,000) 19 (8) SR 0066, Guffy Run Bridge over Guffy 20 Run, Parks Township, Bridge Painting 85,000 21 (Base Construction Allocation - 22 $70,000) 23 (Design and Contingencies - $15,000) 24 (9) SR 0066, Garrett's Run Bridge over 25 Garrett's Run and Old 66, Manor 26 Township, Bridge Painting 1,230,000 27 (Base Construction Allocation - 28 $1,200,000) 29 (Design and Contingencies - $30,000) 30 (10) SR 0128, Cadogan Bridge over 19990S0504B1019 - 43 -
1 Tributary of Allegheny River, Cadogan 2 Township, Bridge Painting 380,000 3 (Base Construction Allocation - 4 $360,000) 5 (Design and Contingencies - $20,000) 6 (11) SR 0422, Judge Graff Bridge over 7 Allegheny River, North Buffalo 8 Township, Bridge Painting 2,930,000 9 (Base Construction Allocation - 10 $2,900,000) 11 (Design and Contingencies - $30,000) 12 (12) SR 0422, Ramp C and F Bridge over End 13 of Bypass, Manor Township, Bridge 14 Painting 180,000 15 (Base Construction Allocation - 16 $165,000) 17 (Design and Contingencies - $15,000) 18 (13) SR 0422, Ramp F Bridge over SR 0066, 19 Manor Township, Bridge Painting 190,000 20 (Base Construction Allocation - 21 $175,000) 22 (Design and Contingencies - $15,000) 23 (14) SR 1021, Eddyville Bridge over Pine 24 Run, Redbank Township, Bridge Painting 100,000 25 (Base Construction Allocation - 26 $85,000) 27 (Design and Contingencies - $15,000) 28 (15) SR 1028, Bryan Bridge over Branch of 29 Pine Creek, Cowanshannock Township, 30 Bridge Painting 50,000 19990S0504B1019 - 44 -
1 (Base Construction Allocation - 2 $35,000) 3 (Design and Contingencies - $15,000) 4 (16) SR 1034, Mosgrove Bridge over North 5 Fork of Pine Creek, Boggs Township, 6 Bridge Painting 65,000 7 (Base Construction Allocation - 8 $50,000) 9 (Design and Contingencies - $15,000) 10 (17) SR 1037, Echo Bridge over Pine Creek, 11 Wayne Township, Bridge Painting 85,000 12 (Base Construction Allocation - 13 $70,000) 14 (Design and Contingencies - $15,000) 15 (18) SR 2001, Rural Valley Bridge over 16 Cowanshannock Creek, Rural Valley 17 Borough, Bridge Painting 130,000 18 (Base Construction Allocation - 19 $115,000) 20 (Design and Contingencies - $15,000) 21 (19) SR 2005, Brick Church Bridge over 22 Branch of Cherry Run, Burrell Township, 23 Bridge Painting 75,000 24 (Base Construction Allocation - 25 $60,000) 26 (Design and Contingencies - $15,000) 27 (20) SR 2005, Cherry Run Bridge over 28 Cherry Run, Plumcreek Township, Bridge 29 Painting 85,000 30 (Base Construction Allocation - 19990S0504B1019 - 45 -
1 $70,000) 2 (Design and Contingencies - $15,000) 3 (21) SR 2005, Elgin Cemetery Bridge over 4 Cowanshannock Creek, Cowanshannock 5 Township, Bridge Painting 85,000 6 (Base Construction Allocation - 7 $70,000) 8 (Design and Contingencies - $15,000) 9 (22) SR 2010, Garrett's Run Bridge over 10 Garrett's Run, Manor Township, Bridge 11 Painting 75,000 12 (Base Construction Allocation - 13 $60,000) 14 (Design and Contingencies - $15,000) 15 (23) SR 2023, Wheel-in-Campground Bridge 16 over Plum Creek, Plumcreek Township, 17 Bridge Painting 125,000 18 (Base Construction Allocation - 19 $110,000) 20 (Design and Contingencies - $15,000) 21 (24) SR 2025, Garrett's Run Bridge No.1 22 over Garrett's Run, Manor Township, 23 Bridge Painting 80,000 24 (Base Construction Allocation - 25 $65,000) 26 (Design and Contingencies - $15,000) 27 (25) SR 2025, Garrett's Run Bridge No.2 28 over Garrett's Run, Manor Township, 29 Bridge Painting 80,000 30 (Base Construction Allocation - 19990S0504B1019 - 46 -
1 $65,000) 2 (Design and Contingencies - $15,000) 3 (26) SR 2025, Garrett's Run Bridge No.3 4 over Garrett's Run, Manor Township, 5 Bridge Painting 90,000 6 (Base Construction Allocation - 7 $75,000) 8 (Design and Contingencies - $15,000) 9 (27) SR 2027, Girty Bridge over Crooked 10 Creek, South Bend Township, Bridge 11 Painting 155,000 12 (Base Construction Allocation - 13 $140,000) 14 (Design and Contingencies - $15,000) 15 (28) SR 2029, Kelly's Station Road Bridge 16 over Taylor Run, Bethel Township, 17 Bridge Painting 60,000 18 (Base Construction Allocation - 19 $45,000) 20 (Design and Contingencies - $15,000) 21 (29) SR 2036, Stilt's Run Bridge over 22 Stilt's Run, Parks Township, Bridge 23 Painting 50,000 24 (Base Construction Allocation - 25 $35,000) 26 (Design and Contingencies - $15,000) 27 (30) SR 2036, Carnahan Run Bridge over 28 Carnahan Run, Parks Township, Bridge 29 Painting 75,000 30 (Base Construction Allocation - 19990S0504B1019 - 47 -
1 $60,000) 2 (Design and Contingencies - $15,000) 3 (31) SR 2050, Rattling Run Bridge over 4 Rattling Run, Kiskiminetas Township, 5 Bridge Painting 65,000 6 (Base Construction Allocation - 7 $50,000) 8 (Design and Contingencies - $15,000) 9 (32) SR 2051, Flat Run Bridge over Flat 10 Run, Kiskiminetas Township, Bridge 11 Painting 55,000 12 (Base Construction Allocation - 13 $40,000) 14 (Design and Contingencies - $15,000) 15 (33) SR 2051, Equitable Bridge over 16 Rattling Run, Kiskiminetas Township, 17 Bridge Painting 55,000 18 (Base Construction Allocation - 19 $40,000) 20 (Design and Contingencies - $15,000) 21 (34) SR 2057, Parks Pump Station Bridge 22 No.1 over Carnahan Run, Parks Township, 23 Bridge Painting 80,000 24 (Base Construction Allocation - 25 $65,000) 26 (Design and Contingencies - $15,000) 27 (35) SR 2058, Parks Pump Station Bridge 28 No.2 over Carnahan Run, Parks Township, 29 Bridge Painting 75,000 30 (Base Construction Allocation - 19990S0504B1019 - 48 -
1 $60,000) 2 (Design and Contingencies - $15,000) 3 (36) SR 3005, Glade Run Bridge over Glade 4 Run, North Buffalo Township, Bridge 5 Painting 75,000 6 (Base Construction Allocation - 7 $60,000) 8 (Design and Contingencies - $15,000) 9 (37) SR 3013, Little Buffalo Bridge over 10 Little Buffalo Creek, West Franklin 11 Township, Bridge Painting 100,000 12 (Base Construction Allocation - 13 $85,000) 14 (Design and Contingencies - $15,000) 15 (38) SR 3013, Harrigan Run Bridge over 16 Harrigan Run, West Franklin Township, 17 Bridge Painting 60,000 18 (Base Construction Allocation - 19 $45,000) 20 (Design and Contingencies - $15,000) 21 (39) SR 3017, West Penn Power Bridge over 22 SR 0422 and SR 0028, East Franklin 23 Township, Bridge Painting 375,000 24 (Base Construction Allocation - 25 $360,000) 26 (Design and Contingencies - $15,000) 27 (40) SR 4007, Kaylor Bridge over Sugar 28 Creek, Bradys Bend Township, Bridge 29 Painting 60,000 30 (Base Construction Allocation - 19990S0504B1019 - 49 -
1 $45,000) 2 (Design and Contingencies - $15,000) 3 (41) SR 4013, Foster Mills Bridge over 4 Branch of Patterson Run, Sugarcreek 5 Township, Bridge Painting 70,000 6 (Base Construction Allocation - 7 $55,000) 8 (Design and Contingencies - $15,000) 9 (42) SR 8008, Ford City Ramp from Judge 10 Graff Bridge over a ravine, Manor 11 Township, Bridge Painting 555,000 12 (Base Construction Allocation - 13 $540,000) 14 (Design and Contingencies - $15,000) 15 (43) SR 4035, Craigsville Bridge over 16 Buffalo Creek, West Franklin Township, 17 Bridge Painting 140,000 18 (Base Construction Allocation - 19 $125,000) 20 (Design and Contingencies - $15,000) 21 (44) SR 0068, Kaylor Overpass, Railroad 22 over PA 68, Bradys Bend Township, 23 Bridge Removal 560,000 24 (Base Construction Allocation - 25 $500,000) 26 (Land Allocation - $10,000) 27 (Design and Contingencies - $50,000) 28 (45) SR 0068, B&LE Railroad Overpass, 29 Bradys Bend Township, Bridge Removal 55,000 30 (Base Construction Allocation - 19990S0504B1019 - 50 -
1 $50,000) 2 (Design and Contingencies - $5,000) 3 (46) SR 0028, Pine Creek Bridge over Pine 4 Creek, Boggs Township, Bridge 5 Rehabilitation 1,450,000 6 (Base Construction Allocation - 7 $1,000,000) 8 (Land Allocation - $100,000) 9 (Design and Contingencies - $350,000) 10 (47) SR 0028, Big Glade Run Bridge over 11 Big Glade Run, North Buffalo Township, 12 Bridge Rehabilitation 1,450,000 13 (Base Construction Allocation - 14 $1,000,000) 15 (Land Allocation - $100,000) 16 (Design and Contingencies - $350,000) 17 (48) SR 0028, Cowanshannock Creek Bridge 18 over Cowanshannock Creek, Rayburn 19 Township, Bridge Rehabilitation 1,450,000 20 (Base Construction Allocation - 21 $1,000,000) 22 (Land Allocation - $100,000) 23 (Design and Contingencies - $350,000) 24 (49) SR 0028, Bridge over Branch of 25 Cowanshannock Creek, Rayburn Township, 26 Bridge Rehabilitation 1,450,000 27 (Base Construction Allocation - 28 $1,000,000) 29 (Land Allocation - $100,000) 30 (Design and Contingencies - $350,000) 19990S0504B1019 - 51 -
1 (50) SR 0028, Hays Run Bridge over Hays 2 Run, Rayburn Township, Bridge 3 Rehabilitation 1,450,000 4 (Base Construction Allocation - 5 $1,000,000) 6 (Land Allocation - $100,000) 7 (Design and Contingencies - $350,000) 8 (51) SR 0028, Furnace Run Bridge over 9 Furnace Run, South Buffalo Township, 10 Bridge Rehabilitation 1,450,000 11 (Base Construction Allocation - 12 $1,000,000) 13 (Land Allocation - $100,000) 14 (Design and Contingencies - $350,000) 15 (52) SR 0028, Pine Run Bridge over Pine 16 Run, South Buffalo Township, Bridge 17 Rehabilitation 1,450,000 18 (Base Construction Allocation - 19 $1,000,000) 20 (Land Allocation - $100,000) 21 (Design and Contingencies - $350,000) 22 (53) SR 0028, Bostonia Run Bridge over 23 Bostonia Run, South Buffalo Township, 24 Bridge Rehabilitation 1,450,000 25 (Base Construction Allocation - 26 $1,000,000) 27 (Land Allocation - $100,000) 28 (Design and Contingencies - $350,000) 29 (54) SR 0028, Scrubgrass Creek Bridge over 30 Scrubgrass Creek, Wayne Township, 19990S0504B1019 - 52 -
1 Bridge Rehabilitation 1,450,000 2 (Base Construction Allocation - 3 $1,000,000) 4 (Land Allocation - $100,000) 5 (Design and Contingencies - $350,000) 6 (55) SR 0210, South Bend Pump Station 7 Bridge over Crooked Creek, South Bend 8 Township, Bridge Rehabilitation 680,000 9 (Base Construction Allocation - 10 $600,000) 11 (Design and Contingencies - $80,000) 12 (56) SR 0268, B & P Railroad Overpass over 13 Railroad at Cowan Station, East 14 Franklin Township, Bridge Replacement 610,000 15 (Base Construction Allocation - 16 $500,000) 17 (Land Allocation - $40,000) 18 (Design and Contingencies - $70,000) 19 (57) SR 0268, Hovey Bridge over Small 20 Stream, Hovey Township, Bridge 21 Rehabilitation 1,050,000 22 (Base Construction Allocation - 23 $750,000) 24 (Land Allocation - $50,000) 25 (Design and Contingencies - $250,000) 26 (58) SR 0268, Church Run Bridge over 27 Church Run, Parker City, Bridge 28 Rehabilitation 1,050,000 29 (Base Construction Allocation - 30 $750,000) 19990S0504B1019 - 53 -
1 (Land Allocation - $50,000) 2 (Design and Contingencies - $250,000) 3 (59) SR 0268, Allison Run Bridge over 4 Allison Run, West Kittaning Township, 5 Bridge Rehabilitation 1,450,000 6 (Base Construction Allocation - 7 $1,000,000) 8 (Land Allocation - $100,000) 9 (Design and Contingencies - $350,000) 10 (60) SR 0422, Big Buffalo Creek Bridge 11 over Big Buffalo Creek, West Franklin 12 Township, Bridge Rehabilitation 1,050,000 13 (Base Construction Allocation - 14 $750,000) 15 (Land Allocation - $50,000) 16 (Design and Contingencies - $250,000) 17 (61) SR 1013, Oak Ridge Bridge over Branch 18 Redbank Creek, Redbank Township, Bridge 19 Deck Replacement 260,000 20 (Base Construction Allocation - 21 $200,000) 22 (Land Allocation - $10,000) 23 (Design and Contingencies - $50,000) 24 (62) SR 1012, BRIDGE OVER NYE RUN BRANCH, <-- 25 REDBANK TOWNSHIP, BRIDGE REPLACEMENT 195,000 26 (BASE CONSTRUCTION ALLOCATION - 27 $110,000) 28 (LAND ALLOCATION - $10,000) 29 (DESIGN AND CONTINGENCIES - $75,000) 30 (63) SR 2001, GASTOWN NORTH BRIDGE OVER 19990S0504B1019 - 54 -
1 REDBANK CREEK, PLUMCREEK TOWNSHIP, 2 BRIDGE REPLACEMENT 195,000 3 (BASE CONSTRUCTION ALLOCATION - 4 $110,000) 5 (LAND ALLOCATION - $10,000) 6 (DESIGN AND CONTINGENCIES - $75,000) 7 (64) SR 2003, GASTOWN BRIDGE OVER CESSNA 8 RUN, PLUMCREEK TOWNSHIP, BRIDGE 9 REPLACEMENT 185,000 10 (BASE CONSTRUCTION ALLOCATION - 11 $100,000) 12 (LAND ALLOCATION - $10,000) 13 (DESIGN AND CONTINGENCIES - $75,000) 14 (65) SR 4007, REST HOME ROAD BRIDGE OVER 15 SMALL STREAM, SUGARCREEK TOWNSHIP, 16 BRIDGE REPLACEMENT 185,000 17 (BASE CONSTRUCTION ALLOCATION - 18 $100,000) 19 (LAND ALLOCATION - $10,000) 20 (DESIGN AND CONTINGENCIES - $75,000) 21 (66) SR 4033, LAIR'S CROSSING ROAD BRIDGE 22 OVER SMALL STREAM, WEST FRANKLIN 23 TOWNSHIP, BRIDGE REPLACEMENT 205,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $120,000) 26 (LAND ALLOCATION - $10,000) 27 (DESIGN AND CONTINGENCIES - $75,000) 28 Section 8. Beaver County. 29 (a) Local Bridges 30 (1) Ambridge and Aliquippa Boroughs, 19990S0504B1019 - 55 -
1 Ambridge - Aliquippa Bridge over Ohio 2 River, Bridge Construction 38,000,000 3 (Base Construction Allocation - 4 $30,000,000) 5 (Land Allocation - $4,000,000) 6 (Design and Contingencies - $4,000,000) 7 (2) Vanport Township, Vanport Bridge No.6 8 over Two Mile Run, Bridge Replacement 465,000 9 (Base Construction Allocation - 10 $375,000) 11 (Land Allocation - $10,000) 12 (Design and Contingencies - $80,000) 13 (3) Vanport Township, Vanport Bridge No.7 14 over Two Mile Run, Bridge Replacement 470,000 15 (Base Construction Allocation - 16 $380,000) 17 (Land Allocation - $10,000) 18 (Design and Contingencies - $80,000) 19 (4) Vanport Township, Vanport Bridge No.8 20 over Two Mile Run, Bridge Replacement 510,000 21 (Base Construction Allocation - 22 $420,000) 23 (Land Allocation - $10,000) 24 (Design and Contingencies - $80,000) 25 (5) Vanport Township, Vanport Bridge No.9 26 over Two Mile Run, Bridge Replacement 440,000 27 (Base Construction Allocation - 28 $350,000) 29 (Land Allocation - $10,000) 30 (Design and Contingencies - $80,000) 19990S0504B1019 - 56 -
1 (6) Borough of New Galilee, Washington 2 Street Bridge over Jordan Run, Bridge 3 Replacement 1,000,000 4 (b) State Bridges 5 (1) SR 0051, Bridge over New York Avenue, 6 Ramp A, Rochester Borough, Bridge Deck 7 Replacement 5,600,000 8 (Base Construction Allocation - 9 $5,500,000) 10 (Design and Contingencies - $100,000) 11 (2) SR 0351, 5th Street, Koppel-Ellwood 12 Bridge over Beaver River, Koppel 13 Borough and North Sewickley Township, 14 Bridge Replacement, Phase I 33,500,000 15 (Base Construction Allocation - 16 $30,000,000) 17 (Land Allocation - $1,000,000) 18 (Design and Contingencies - $2,500,000) 19 (3) SR 1014, Wise's Grove Road Bridge over 20 Brush Creek, Marion Township, Bridge 21 Rehabilitation 750,000 22 (Base Construction Allocation - 23 $600,000) 24 (Land Allocation - $50,000) 25 (Design and Contingencies - $100,000) 26 (4) SR 1022, 13th Street Bridge over 27 Blockhouse Run at Pulaski County Line, 28 New Brighton Borough, Bridge 29 Replacement 780,000 30 (Base Construction Allocation - 19990S0504B1019 - 57 -
1 $480,000) 2 (Land Allocation - $50,000) 3 (Design and Contingencies - $250,000) 4 (5) SR 4032, Engle Road Bridge over Six 5 Mile Run Creek, Industry Borough, 6 Bridge Replacement 350,000 7 (Base Construction Allocation - 8 $200,000) 9 (Land Allocation - $50,000) 10 (Design and Contingencies - $100,000) 11 (6) SR 4033, Wildwood Road Bridge over 12 Brady's Run, Patterson Township, Bridge 13 Replacement 400,000 14 (Base Construction Allocation - 15 $250,000) 16 (Land Allocation - $50,000) 17 (Design and Contingencies - $100,000) 18 (7) SR 8035, Ramp A at LR 641 over Slope, 19 Rochester Borough, Bridge 20 Rehabilitation 1,200,000 21 (Base Construction Allocation - 22 $1,000,000) 23 (Land Allocation - $50,000) 24 (Design and Contingencies - $150,000) 25 (8) SR 8037, Ramp F over TR 51 and TR 65 26 Northbound, Rochester Borough, Bridge 27 Replacement 550,000 28 (Base Construction Allocation - 29 $400,000) 30 (Land Allocation - $50,000) 19990S0504B1019 - 58 -
1 (Design and Contingencies - $100,000) 2 (9) SR 8039, Ramp AD, SR 0168 over TR 51, 3 Bridgewater Borough, Bridge 4 Rehabilitation 700,000 5 (Base Construction Allocation - 6 $550,000) 7 (Land Allocation - $50,000) 8 (Design and Contingencies - $100,000) 9 (10) SR 3018, Culvert-pipe Style Bridge 10 over Moody's Run, Greene Township, 11 Bridge Construction 385,000 12 (Base Construction Allocation - 13 $350,000) 14 (Design and Contingencies - $35,000) 15 (11) SR 0051, Pennsylvania Avenue Bridge 16 over Brady's Run Creek, Fallston 17 Borough, Bridge Replacement 757,000 18 (Base Construction Allocation - 19 $637,000) 20 (Land Allocation - $20,000) 21 (Design and Contingencies - $100,000) 22 (12) SR 0060, Beaver Valley Extension 23 Southbound Bridge over T-535, Brighton 24 Township, Bridge Rehabilitation 167,000 25 (Base Construction Allocation - 26 $153,000) 27 (Design and Contingencies - $14,000) 28 (13) SR 0060, Beaver Valley Extension 29 Northbound Bridge over T-535, Brighton 30 Township, Bridge Rehabilitation 178,000 19990S0504B1019 - 59 -
1 (Base Construction Allocation - 2 $163,000) 3 (Design and Contingencies - $15,000) 4 (14) SR 0060, Beaver Valley Expansion 5 Bridge over SR 0151, Hopewell Township, 6 Bridge Deck Replacement 1,125,000 7 (Base Construction Allocation - 8 $1,000,000) 9 (Design and Contingencies - $125,000) 10 (15) SR 0588, Riverview Road Bridge over 11 Pine Run, Marion Township, Bridge 12 Replacement 250,000 13 (Base Construction Allocation - 14 $150,000) 15 (Design and Contingencies - $100,000) 16 (16) SR 1009, Hartzel Road Bridge over 17 Connoquenessing Creek, Marion Township, 18 Bridge Replacement 1,150,000 19 (Base Construction Allocation - 20 $1,000,000) 21 (Land Allocation - $50,000) 22 (Design and Contingencies - $100,000) 23 (17) SR 1016, Tatko Road Bridge over Brush 24 Creek, New Sewickley Township, Bridge 25 Replacement 420,000 26 (Base Construction Allocation - 27 $300,000) 28 (Land Allocation - $20,000) 29 (Design and Contingencies - $100,000) 30 (18) SR 1032, New York Avenue Bridge over 19990S0504B1019 - 60 -
1 Conrail, SR 1032 and Local Street, 2 Rochester Borough, Bridge 3 Rehabilitation 3,100,000 4 (Base Construction Allocation - 5 $3,000,000) 6 (Design and Contingencies - $100,000) 7 (19) SR 4035, Sebring Road Bridge over SR 8 0060, Brighton Township, Bridge 9 Rehabilitation 394,000 10 (Base Construction Allocation - 11 $361,000) 12 (Design and Contingencies - $33,000) 13 (20) SR 3032, Kendal Harshavile Road 14 Bridge over Branch of Traverse Creek, 15 Hanover Township, Bridge Replacement 250,000 16 (Base Construction Allocation - 17 $100,000) 18 (Land Allocation - $50,000) 19 (Design and Contingencies - $100,000) 20 (21) SR 4012, Brady's Run Bridge over 21 South Branch Brady's Run, Brighton 22 Township, Bridge Painting 32,000 23 (Base Construction Allocation - 24 $27,000) 25 (Design and Contingencies - $5,000) 26 (22) SR 4020, Dutch Ridge Road Bridge over 27 PA 60, Brighton Township, Bridge 28 Rehabilitation 500,000 29 (Base Construction Allocation - 30 $350,000) 19990S0504B1019 - 61 -
1 (Land Allocation - $50,000) 2 (Design and Contingencies - $100,000) 3 (23) SR 4032, Engle Road Bridge over Six 4 Mile Run, Industry Borough, Bridge 5 Painting 36,000 6 (Base Construction Allocation - 7 $31,000) 8 (Design and Contingencies - $5,000) 9 (24) SR 0060, Vanport Bridge over Ohio 10 River, Vanport Borough, Bridge 11 Painting 965,000 12 (Base Construction Allocation - 13 $950,000) 14 (Design and Contingencies - $15,000) 15 Section 9. Bedford County. 16 (a) Local Bridges 17 (1) Broad Top Township, T-550, Mosquito 18 Bridge over Six Mile Run, Bridge 19 Replacement 505,000 20 (Base Construction Allocation - 21 $400,000) 22 (Land Allocation - $10,000) 23 (Design and Contingencies - $95,000) 24 (2) Broad Top Township, T-553, Langdondale 25 Bridge over Sandy Run, Bridge 26 Replacement 395,000 27 (Base Construction Allocation - 28 $300,000) 29 (Land Allocation - $10,000) 30 (Design and Contingencies - $85,000) 19990S0504B1019 - 62 -
1 (3) Broad Top Township, T-583, Longs Run 2 Bridge over Longs Run, Bridge 3 Replacement 395,000 4 (Base Construction Allocation - 5 $300,000) 6 (Land Allocation - $10,000) 7 (Design and Contingencies - $85,000) 8 (4) Harrison Township, T-418, Turner 9 Covered Bridge over Juniata River, 10 Bridge Rehabilitation 825,000 11 (Base Construction Allocation - 12 $700,000) 13 (Land Allocation - $25,000) 14 (Design and Contingencies - $100,000) 15 (5) Monroe Township, T-354, Sideling Hill 16 over East Branch Sideling Hill Creek, 17 Bridge Replacement 335,000 18 (Base Construction Allocation - 19 $250,000) 20 (Land Allocation - $10,000) 21 (Design and Contingencies - $75,000) 22 (6) South Woodbury Township, T-705 over 23 Three Springs Run, Bridge Replacement 450,000 24 (Base Construction Allocation - 25 $325,000) 26 (Land Allocation - $50,000) 27 (Design and Contingencies - $75,000) 28 (7) West St. Clair Township, T-565 over 29 Dunning Creek, Bridge Replacement 550,000 30 (Base Construction Allocation - 19990S0504B1019 - 63 -
1 $450,000) 2 (Land Allocation - $25,000) 3 (Design and Contingencies - $75,000) 4 (8) Londonderry Township, T-653 over Wills 5 Creek, Bridge Replacement 945,000 6 (Base Construction Allocation - 7 $850,000) 8 (Land Allocation - $20,000) 9 (Design and Contingencies - $75,000) 10 (9) East Providence Township, T-419 over 11 Brush Creek, Bridge Replacement 1,170,000 12 (Base Construction Allocation - 13 $1,000,000) 14 (Land Allocation - $20,000) 15 (Design and Contingencies - $150,000) 16 (10) Broadtop Township, T-677, Riddlesburg 17 Bridge, County Bridge No.35 over Six 18 Mile Run, Bridge Replacement 190,000 19 (Base Construction Allocation - 20 $150,000) 21 (Land Allocation - $5,000) 22 Design and Contingencies - $35,000) 23 (11) Mann Township, T-319, County Bridge 24 No.27 over Sidling Hill Creek, Bridge 25 Replacement 620,000 26 (Base Construction Allocation - 27 $500,000) 28 (Land Allocation - $20,000) 29 (Design and Contingencies - $100,000) 30 (12) Cumberland Valley Township, T-377 19990S0504B1019 - 64 -
1 over Beaver's Run, Bridge Replacement 410,000 2 (Base Construction Allocation - 3 $325,000) 4 (Land Allocation - $5,000) 5 (Design and Contingencies - $80,000) 6 (13) Cumberland Valley Township, T-337 7 over Evitts Creek, Bridge Replacement 455,000 8 (Base Construction Allocation - 9 $370,000) 10 (Land Allocation - $5,000) 11 (Design and Contingencies - $80,000) 12 (14) Kimmell Township, County Bridge No.3 13 over Beaverdam Creek, Bridge 14 Replacement 490,000 15 (Base Construction Allocation - 16 $380,000) 17 (Land Allocation - $20,000) 18 (Design and Contingencies - $90,000) 19 (15) Hopewell Township, County Bridge No.4 20 over Yellow Creek, Bridge Replacement 970,000 21 (Base Construction Allocation - 22 $800,000) 23 (Land Allocation - $20,000) 24 (Design and Contingencies - $150,000) 25 (16) Colerain Township, Bridge No.2, 26 Bridge Replacement 445,000 27 (Base Construction Allocation - 28 $350,000) 29 (Land Allocation - $5,000) 30 (Design and Contingencies - $90,000) 19990S0504B1019 - 65 -
1 (17) Bedford Borough, Bridge No.1 over 2 Shober's Run, Bridge Replacement 800,000 3 (Base Construction Allocation - 4 $640,000) 5 (Land Allocation - $10,000) 6 (Design and Contingencies - $150,000) 7 (18) West St. Clair Township, Township 8 Bridge No.8 over Branch of Dunning 9 Creek, Bridge Replacement 480,000 10 (Base Construction Allocation - 11 $350,000) 12 (Land Allocation - $5,000) 13 (Design and Contingencies - $125,000) 14 (19) Londonderry Township, T-669, Gladden 15 Pike Bridge Over Gladden's Run, Bridge 16 Replacement 395,000 17 (Base Construction Allocation - 18 $300,000) 19 (Land Allocation - $85,000) 20 (Design and Contingencies - $10,000) 21 (20) EVERETT BOROUGH, BRIDGE NO.1 OVER <-- 22 BLOODY RUN, BRIDGE REPLACEMENT 571,000 23 (BASE CONSTRUCTION ALLOCATION - 24 $400,000) 25 (LAND ALLOCATION - $1,000) 26 (DESIGN AND CONTINGENCIES - $170,000) 27 (b) State Bridges 28 (1) SR 0220, US 220, Northbound Bridge 29 over Pennsylvania Turnpike, Bedford 30 Township, Bridge Painting 180,000 19990S0504B1019 - 66 -
1 (Base Construction Allocation - 2 $150,000) 3 (Design and Contingencies - $30,000) 4 (2) SR 0220, US 220, Southbound Bridge 5 over Pennsylvania Turnpike, Bedford 6 Township, Bridge Painting 170,000 7 (Base Construction Allocation - 8 $140,000) 9 (Design and Contingencies - $30,000) 10 (3) SR 0869, Wallachs Bridge over Wallachs 11 Branch, Pavia Township, Bridge 12 Replacement 455,000 13 (Base Construction Allocation - 14 $325,000) 15 (Land Allocation - $25,000) 16 (Design and Contingencies - $105,000) 17 (4) SR 3019, Kegg Run Bridge over Kegg 18 Run, Juniata Township, Bridge 19 Replacement 655,000 20 (Base Construction Allocation - 21 $495,000) 22 (Land Allocation - $25,000) 23 (Design and Contingencies - $135,000) 24 (5) SR 2006, Sidling Hill Bridge over East 25 Branch Sidling Hill Creek, Monroe 26 Township, Bridge Replacement 750,000 27 (Base Construction Allocation - 28 $580,000) 29 (Land Allocation - $25,000) 30 (Design and Contingencies - $145,000) 19990S0504B1019 - 67 -
1 (6) SR 3008, BRIDGE OVER TRIBUTARY OF <-- 2 LITTLE WILLS CREEK, JUNIATA TOWNSHIP, 3 BRIDGE REHABILITATION 96,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $78,000) 6 (LAND ALLOCATION - $2,000) 7 (DESIGN AND CONTINGENCIES - $16,000) 8 (7) SR 3017, COVE RUN BRIDGE OVER COVE 9 RUN, HARRISON TOWNSHIP, BRIDGE 10 REHABILITATION 110,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $90,000) 13 (LAND ALLOCATION - $2,000) 14 (DESIGN AND CONTINGENCIES - $18,000) 15 (8) SR 4034, BRIDGE OVER I-99/US 220, KING 16 TOWNSHIP, BRIDGE PAINTING 275,000 17 (BASE CONSTRUCTION ALLOCATION - 18 $250,000) 19 (LAND ALLOCATION - $5,000) 20 (DESIGN AND CONTINGENCIES - $20,000) 21 Section 10. Berks County. 22 (a) Local Bridges 23 (1) City of Reading, Fritz Island Bridge 24 over Angelica Creek, Bridge 25 Rehabilitation 23,000 26 (Base Construction Allocation - 27 $20,000) 28 (Design and Contingencies - $3,000) 29 (2) City of Reading, Bernadine Street over 30 Angelica Creek, Bridge Rehabilitation 175,000 19990S0504B1019 - 68 -
1 (Base Construction Allocation - 2 $145,000) 3 (Design and Contingencies - $30,000) 4 (3) City of Reading, Tulpehocken Street 5 Footbridge, Bridge Rehabilitation 6,000 6 (Base Construction Allocation - $5,000) 7 (Design and Contingencies - $1,000) 8 (4) West Reading Borough, Museum Road over 9 Wyomissing Creek, Bridge 10 Rehabilitation 15,000 11 (Base Construction Allocation - 12 $12,000) 13 (Design and Contingencies - $3,000) 14 (5) Amity Township, Lake Drive over 15 Tributary of Schuylkill River, Bridge 16 Rehabilitation 86,000 17 (Base Construction Allocation - 18 $75,000) 19 (Design and Contingencies - $11,000) 20 (6) Amity Township, Browns Mill Road over 21 Spring Creek, Bridge Rehabilitation 6,000 22 (Base Construction Allocation - $5,000) 23 (Design and Contingencies - $1,000) 24 (7) Amity Township, Valley Road over 25 Spring Creek, Bridge Rehabilitation 10,000 26 (Base Construction Allocation - $8,000) 27 (Design and Contingencies - $2,000) 28 (8) Amity Township, Monocacy Road over 29 Monocacy Creek, Bridge Rehabilitation 11,000 30 (Base Construction Allocation - $9,000) 19990S0504B1019 - 69 -
1 (Design and Contingencies - $2,000) 2 (9) Bethel Township, T-492 over Little 3 Swatara Creek, Bridge Replacement 700,000 4 (Base Construction Allocation - 5 $500,000) 6 (Land Allocation - $50,000) 7 (Design and Contingencies - $150,000) 8 (10) Bethel Township, T-682 over Crosskill 9 Creek, Bridge Replacement 750,000 10 (Base Construction Allocation - 11 $550,000) 12 (Land Allocation - $50,000) 13 (Design and Contingencies - $150,000) 14 (11) Lenhartsville Borough, Penn Avenue 15 over Maiden Creek, Bridge Replacement 960,000 16 (Base Construction Allocation - 17 $750,000) 18 (Land Allocation - $10,000) 19 (Design and Contingencies - $200,000) 20 (12) Mohnton Borough, Main Street over 21 Wyomissing Creek, Bridge Replacement 750,000 22 (Base Construction Allocation - 23 $550,000) 24 (Land Allocation - $50,000) 25 (Design and Contingencies - $150,000) 26 (13) Muhlenberg Township, Hain Avenue over 27 Laurel Run, Bridge Rehabilitation 100,000 28 (Base Construction Allocation - 29 $80,000) 30 (Design and Contingencies - $20,000) 19990S0504B1019 - 70 -
1 (14) Oley Township, T-500 over Furnace 2 Creek, Bridge Replacement 700,000 3 (Base Construction Allocation - 4 $500,000) 5 (Land Allocation - $50,000) 6 (Design and Contingencies - $150,000) 7 (15) Robesonia Borough, Freeman Street 8 over Furnace Creek, Bridge Replacement 700,000 9 (Base Construction Allocation - 10 $500,000) 11 (Land Allocation - $50,000) 12 (Design and Contingencies - $150,000) 13 (16) Washington Township, T-884 over Swamp 14 Creek, Bridge Replacement 700,000 15 (Base Construction Allocation - 16 $500,000) 17 (Land Allocation - $50,000) 18 (Design and Contingencies - $150,000) 19 (17) Upper Bern Township, Mill Hill Road, 20 T-712 over Mill Creek, Bridge 21 Replacement 70,000 22 (Base Construction Allocation - 23 $40,000) 24 (Land Allocation - $10,000) 25 (Design and Contingencies - $20,000) 26 (18) North Heidelberg Township, T-501, 27 Milestone Road Bridge over Tributary of 28 Spring Creek, Bridge Replacement 94,000 29 (Base Construction Allocation - 30 $82,000) 19990S0504B1019 - 71 -
1 (Land Allocation - $4,000) 2 (Design and Contingencies - $8,000) 3 (19) Robeson Township, T-366, Bridge over 4 Allegheny Creek, Bridge Replacement 133,000 5 (Base Construction Allocation - 6 $117,000) 7 (Land Allocation - $5,000) 8 (Design and Contingencies - $11,000) 9 (b) State Bridges 10 (1) SR 0010, Reading Road over Tributary 11 of Conestoga Creek, Caernarvon 12 Township, Bridge Rehabilitation 775,000 13 (Base Construction Allocation - 14 $490,000) 15 (Land Allocation - $100,000) 16 (Design and Contingencies - $185,000) 17 (2) SR 0222, SR 0222 Northbound over SR 18 0737 Exit, Maxatawny Township, Bridge 19 Painting 45,000 20 (Base Construction Allocation - 21 $45,000) 22 (3) SR 0222, North Elm Street over SR 23 0222, Kutztown Borough, Bridge 24 Painting 45,000 25 (Base Construction Allocation - 26 $45,000) 27 (4) SR 0222, SR 0222 Northbound over SR 28 8015, Ramp G, Maxatawny Township, 29 Bridge Painting 45,000 30 (Base Construction Allocation - 19990S0504B1019 - 72 -
1 $45,000) 2 (5) SR 0222, SR 0222 Southbound over SR 3 8015, Ramp G, Maxatawny Township, 4 Bridge Painting 45,000 5 (Base Construction Allocation - 6 $45,000) 7 (6) SR 2038, Grist Mill Road over 8 Ironstone Creek, Douglass Township, 9 Bridge Replacement 405,000 10 (Base Construction Allocation - 11 $235,000) 12 (Land Allocation - $70,000) 13 (Design and Contingencies - $100,000) 14 (7) SR 0073, Bridge over Railroad, Maiden 15 Creek Township, Bridge Rehabilitation 14,000 16 (Base Construction Allocation - 17 $12,000) 18 (Design and Contingencies - $2,000) 19 (8) SR 2014, Spring Street Subway, City of 20 Reading, Bridge Rehabilitation 18,000 21 (Base Construction Allocation - 22 $15,000) 23 (Design and Contingencies - $3,000) 24 (9) SR 0073, SR 0073 over Manatawny Creek, 25 Oley Township, Bridge Rehabilitation 500,000 26 (Base Construction Allocation - 27 $450,000) 28 (Design and Contingencies - $50,000) 29 (10) SR 0061, SR 0061 over Blue Mountain 30 Railroad, Borough of Hamburg, Bridge 19990S0504B1019 - 73 -
1 Rehabilitation 200,000 2 (Base Construction Allocation - 3 $175,000) 4 (Design and Contingencies - $25,000) 5 (11) SR 0078, SR 0078 over SR 1024, 6 Greenwich Township, Bridge 7 Rehabilitation 500,000 8 (Base Construction Allocation - 9 $450,000) 10 (Design and Contingencies - $50,000) 11 (12) SR 0078, SR 0078 over T-808, Windsor 12 Township, Bridge Rehabilitation 500,000 13 (Base Construction Allocation - 14 $450,000) 15 (Design and Contingencies - $50,000) 16 (13) SR 0078, SR 0078 over Fifth Street, 17 Borough of Hamburg, Bridge 18 Rehabilitation 200,000 19 (Base Construction Allocation - 20 $175,000) 21 (Design and Contingencies - $25,000) 22 (14) SR 0078, SR 0078 over T-688, Bethel 23 Township, Bridge Rehabilitation 250,000 24 (Base Construction Allocation - 25 $225,000) 26 (Design and Contingencies - $25,000) 27 (15) SR 0176, SR 0176 over T-568, Robeson 28 Township, Bridge Rehabilitation 250,000 29 (Base Construction Allocation - 30 $200,000) 19990S0504B1019 - 74 -
1 (Design and Contingencies - $50,000) 2 (16) SR 0176, SR 0176 2/10 mile south of 3 SR 0422, Cumru Township, Bridge 4 Rehabilitation 350,000 5 (Base Construction Allocation - 6 $300,000) 7 (Design and Contingencies - $50,000) 8 (17) SR 1083, SR 0183 over Little 9 Northkill Creek, Jefferson Township, 10 Bridge Replacement 1,000,000 11 (Base Construction Allocation - 12 $750,000) 13 (Land Allocation - $100,000) 14 (Design and Contingencies - $150,000) 15 (18) SR 0222, SR 0222 over Abandoned 16 Railroad, City of Reading, Bridge 17 Rehabilitation 200,000 18 (Base Construction Allocation - 19 $150,000) 20 (Design and Contingencies - $50,000) 21 (19) SR 0422, SR 0422 over Tulpehocken 22 Creek, Borough of Womelsdorf, Bridge 23 Rehabilitation 200,000 24 (Base Construction Allocation - 25 $150,000) 26 (Design and Contingencies - $50,000) 27 (20) SR 0568, SR 0568 over Allegheny 28 Creek, Robeson Township, Bridge 29 Rehabilitation 100,000 30 (Base Construction Allocation - 19990S0504B1019 - 75 -
1 $80,000) 2 (Design and Contingencies - $20,000) 3 (21) SR 0737, SR 0737 2.63 miles north of 4 Kutztown, Greenwich Township, Bridge 5 Rehabilitation 500,000 6 (Base Construction Allocation - 7 $450,000) 8 (Design and Contingencies - $50,000) 9 (22) SR 0737, SR 0737 2.82 miles north of 10 Kutztown, Greenwich Township, Bridge 11 Rehabilitation 500,000 12 (Base Construction Allocation - 13 $450,000) 14 (Design and Contingencies - $50,000) 15 (23) SR 2025, SR 2025 1/2 mile east of SR 16 0422, Amity Township, Bridge 17 Replacement 300,000 18 (Base Construction Allocation - 19 $200,000) 20 (Land Allocation - $15,000) 21 (Design and Contingencies - $85,000) 22 (24) SR 2031, SR 2031 over Hay Creek, 23 Robeson Township, Bridge 24 Rehabilitation 500,000 25 (Base Construction Allocation - 26 $450,000) 27 (Design and Contingencies - $50,000) 28 (25) SR 2032, SR 2032 over Tributary of 29 Swamp Creek, Washington Township, 30 Bridge Replacement 500,000 19990S0504B1019 - 76 -
1 (Base Construction Allocation - 2 $375,000) 3 (Land Allocation - $25,000) 4 (Design and Contingencies - $100,000) 5 (26) SR 2039, SR 2039 over SR 0422, Exeter 6 Township, Bridge Replacement 2,750,000 7 (Base Construction Allocation - 8 $2,000,000) 9 (Land Allocation - $250,000) 10 (Design and Contingencies - $500,000) 11 (27) SR 2041, SR 2041 2 miles west of 12 Weavertown, Amity Township, Bridge 13 Replacement 200,000 14 (Base Construction Allocation - 15 $125,000) 16 (Land Allocation - $15,000) 17 (Design and Contingencies - $60,000) 18 (28) SR 2057, SR 2057 over Leaf Creek, 19 Amity Township, Bridge Replacement 600,000 20 (Base Construction Allocation - 21 $425,000) 22 (Land Allocation - $25,000) 23 (Design and Contingencies - $150,000) 24 (29) SR 3003, SR 3003 over Angelica Creek, 25 Cumru Township, Bridge Replacement 200,000 26 (Base Construction Allocation - 27 $125,000) 28 (Land Allocation - $15,000) 29 (Design and Contingencies - $60,000) 30 (30) SR 4026, SR 4026 over Irish Creek, 19990S0504B1019 - 77 -
1 Borough of Centerport, Bridge 2 Rehabilitation 250,000 3 (Base Construction Allocation - 4 $225,000) 5 (Design and Contingencies - $25,000) 6 (31) SR 0073, Bridge over Maiden Creek, 7 Ontelaunee Township, Bridge 8 Replacement 2,120,000 9 (Base Construction Allocation - 10 $2,000,000) 11 (Land Allocation - $20,000) 12 (Design and Contingencies - $100,000) 13 (32) SR 2021, Mineral Spring Road, 14 Lindbergh Viaduct, City of Reading, 15 Bridge Rehabilitation 4,000,000 16 (33) SR 0222, US 222 Bridge Painting, 17 Seven Structures, Kutztown, West 18 Reading and Maxatawny, Bridge Painting 1,000,000 19 (Base Construction Allocation - 20 $1,000,000) 21 (34) SR 0422, Reading Bypass Bridges over 22 Schuylkill River and US 222, Six Bridge 23 Rehabilitations with Latex, City of 24 Reading, Bridge Deck Rehabilitation 5,050,000 25 (Base Construction Allocation - 26 $5,000,000) 27 (Design and Contingencies - $50,000) 28 Section 11. Blair County. 29 (a) Local Bridges 30 (1) Antis Township, T-490, Becker Road 19990S0504B1019 - 78 -
1 Bridge over Tributary of Little Juniata 2 River, Bridge Replacement 310,000 3 (Base Construction Allocation - 4 $250,000) 5 (Land Allocation - $10,000) 6 (Design and Contingencies - $50,000) 7 (2) Taylor Township, T-332, Halter Creek 8 Bridge over Halter Creek, Bridge 9 Replacement 395,000 10 (Base Construction Allocation - 11 $300,000) 12 (Land Allocation - $10,000) 13 (Design and Contingencies - $85,000) 14 (3) Greenfield Township, T-531 over South 15 Poplar Run, Construct new bridge 280,000 16 (Base Construction Allocation - 17 $200,000) 18 (Land Allocation - $20,000) 19 (Design and Contingencies - $60,000) 20 (4) Greenfield Township, T-531 over Big 21 Lick Branch of South Poplar Run, Bridge 22 Replacement 565,000 23 (Base Construction Allocation - 24 $465,000) 25 (Land Allocation - $30,000) 26 (Design and Contingencies - $70,000) 27 (5) Greenfield Township, County Road 101 28 over Polecat Run, Bridge Replacement 520,000 29 (Base Construction Allocation - 30 $400,000) 19990S0504B1019 - 79 -
1 (Land Allocation - $20,000) 2 (Design and Contingencies - $100,000) 3 (6) Newry Borough, Allegheny Street over 4 Tributary of Poplar Run, Bridge 5 Rehabilitation 425,000 6 (Base Construction Allocation - 7 $350,000) 8 (Land Allocation - $25,000) 9 (Design and Contingencies - $50,000) 10 (7) Allegheny Township, Ellenberger Road, 11 Quarry Bridge over Mill Run Creek, 12 Bridge Replacement 319,000 13 (Base Construction Allocation - 14 $277,000) 15 (Design and Contingencies - $42,000) 16 (8) City of Altoona, Beale Avenue, Bridge 17 over Mill Run Creek, Bridge 18 Replacement 380,000 19 (Base Construction Allocation - 20 $330,000) 21 (Design and Contingencies - $50,000) 22 (9) City of Altoona, Broad Avenue, Bridge 23 over Mill Run Creek, Bridge 24 Replacement 317,000 25 (Base Construction Allocation - 26 $275,000) 27 (Design and Contingencies - $42,000) 28 (10) City of Altoona, Hite Company Access, 29 Bridge over Mill Run Creek, Bridge 30 Replacement 118,000 19990S0504B1019 - 80 -
1 (Base Construction Allocation - 2 $101,000) 3 (Design and Contingencies - $17,000) 4 (11) City of Altoona, 31st Street, Conrail 5 No.1 Bridge over Mill Run Creek, Bridge 6 Replacement 160,000 7 (Base Construction Allocation - 8 $139,000) 9 (Design and Contingencies - $21,000) 10 (12) City of Altoona, West Chestnut 11 Avenue, Bridge over Mill Run Creek, 12 Bridge Replacement 285,000 13 (Base Construction Allocation - 14 $248,000) 15 (Design and Contingencies - $37,000) 16 (13) City of Altoona, Spruce Avenue, 17 Bridge over Mill Run Creek, Bridge 18 Replacement 285,000 19 (Base Construction Allocation - 20 $248,000) 21 (Design and Contingencies - $37,000) 22 (14) City of Altoona, Coleridge Avenue, 23 Bridge over Mill Run Creek, Bridge 24 Replacement 570,000 25 (Base Construction Allocation - 26 $495,000) 27 (Design and Contingencies - $75,000) 28 (b) State bridges 29 (1) SR 0022, Canal Park Bridges over the 30 Juniata River, Hollidaysburg Borough, 19990S0504B1019 - 81 -
1 Bridge Replacement 3,000,000 2 (Base Construction Allocation - 3 $2,000,000) 4 (Land Allocation - $650,000) 5 (Design and Contingencies - $350,000) 6 (2) SR 4008, SR 4008 over Tributary of 7 Glenwhite Run, Logan Township, Bridge 8 Replacement 240,000 9 (Base Construction Allocation - 10 $200,000) 11 (Land Allocation - $5,000) 12 (Design and Contingencies - $35,000) 13 (3) SR 4004, 58th Street Bridge over Mill 14 Run Creek, City of Altoona, Bridge 15 Replacement 598,000 16 (Base Construction Allocation - 17 $520,000) 18 (Design and Contingencies - $78,000) 19 (4) SR 4003, Logan Boulevard Bridge over 20 Mill Run Creek, City of Altoona, Bridge 21 Replacement 1,438,000 22 (Base Construction Allocation - 23 $1,250,000) 24 (Design and Contingencies - $188,000) 25 (5) SR 0036, Union Avenue Bridge over Mill 26 Run Creek, City of Altoona, Bridge 27 Replacement 770,000 28 (Base Construction Allocation - 29 $670,000) 30 (Design and Contingencies - $100,000) 19990S0504B1019 - 82 -
1 (6) SR 4029, BRIDGE OVER SCHELL RUN, <-- 2 TYRONE BOROUGH, BRIDGE REHABILITATION 120,000 3 (BASE CONSTRUCTION ALLOCATION - 4 $90,000) 5 (LAND ALLOCATION - $1,000) 6 (DESIGN AND CONTINGENCIES - $29,000) 7 (7) SR 0164, BRIDGE OVER DRY RUN, FREEDOM 8 TOWNSHIP, BRIDGE REPLACEMENT 1,030,000 9 (BASE CONSTRUCTION ALLOCATION - 10 $900,000) 11 (LAND ALLOCATION - $85,000) 12 (DESIGN AND CONTINGENCIES - $45,000) 13 Section 12. Bradford County. 14 (a) Local Bridges 15 (1) Burlington Township, T-547 over Wallis 16 Run, Bridge Replacement 395,000 17 (Base Construction Allocation - 18 $310,000) 19 (Land Allocation - $10,000) 20 (Design and Contingencies - $75,000) 21 (2) Pike Township, T-790 over Gaylord 22 Creek and South Creek, Bridge 23 Replacement 495,000 24 (Base Construction Allocation - 25 $410,000) 26 (Land Allocation - $10,000) 27 (Design and Contingencies - $75,000) 28 (3) Canton Township, T-889, County Bridge 29 No.45 over Towanda Creek, Bridge 30 Replacement 480,000 19990S0504B1019 - 83 -
1 (Base Construction Allocation - 2 $400,000) 3 (Land Allocation - $25,000) 4 (Design and Contingencies - $55,000) 5 (4) Tuscarora Township, T-874, County 6 Bridge No.36 over Fargo Creek, Bridge 7 Replacement 265,000 8 (Base Construction Allocation - 9 $215,000) 10 (Land Allocation - $15,000) 11 (Design and Contingencies - $35,000) 12 (5) Franklin Township, T-358, County 13 Bridge No.12 over Towanda Creek, Bridge 14 Replacement 1,020,000 15 (Base Construction Allocation - 16 $850,000) 17 (Land Allocation - $50,000) 18 (Design and Contingencies - $120,000) 19 (6) Litchfield Township, T-900, Parks 20 Creek Structure Bridge over Parks 21 Creek, Bridge Replacement 390,000 22 (Base Construction Allocation - 23 $220,000) 24 (Land Allocation - $20,000) 25 (Design and Contingencies - $150,000) 26 (7) Albany Township, T-377, Bridge over 27 Bowman Creek 390,000 28 (Base Construction Allocation - 29 $250,000) 30 (Land Allocation - $10,000) 19990S0504B1019 - 84 -
1 (Design and Contingencies - $130,000) 2 (8) Towanda Township, T-545, Bridge over 3 Sugar Creek, Bridge Replacement 1,247,000 4 (Base Construction Allocation - 5 $1,033,000) 6 (Land Allocation - $65,000) 7 (Design and Contingencies - $149,000) 8 (9) Wells Township, T-763, Bridge over 9 Seely Creek, Bridge Replacement 428,000 10 (Base Construction Allocation - 11 $355,000) 12 (Land Allocation - $22,000) 13 (Design and Contingencies - $51,000) 14 (10) Terry Township, T-420, Bridge over 15 Foster Branch of Sugar Creek, Bridge 16 Replacement 663,000 17 (Base Construction Allocation - 18 $550,000) 19 (Land Allocation - $33,000) 20 (Design and Contingencies - $80,000) 21 (11) Canton Township, T-889, County Bridge 22 No.45 over Towanda Creek, Bridge 23 Replacement 480,000 24 (Base Construction Allocation - 25 $400,000) 26 (Land Allocation - $25,000) 27 (Design and Contingencies - $55,000) 28 (12) Tuscarora Township, T-874, County 29 Bridge No.36 over Fargo Creek, Bridge 30 Replacement 265,000 19990S0504B1019 - 85 -
1 (Base Construction Allocation - 2 $215,000) 3 (Land Allocation - $15,000) 4 (Design and Contingencies - $35,000) 5 (13) Franklin Township, T-358, County 6 Bridge No.12 over Towanda Creek, Bridge 7 Replacement 1,020,000 8 (Base Construction Allocation - 9 $850,000) 10 (Land Allocation - $50,000) 11 (Design and Contingencies - $120,000) 12 (14) Litchfield Township, T-900 over Parks 13 Creek, Parks Creek Structure Bridge, 14 Bridge Replacement 390,000 15 (Base Construction Allocation - 16 $220,000) 17 (Land Allocation - $20,000) 18 (Design and Contingencies - $150,000) 19 (15) Albany Township, T-381, County Bridge 20 No.2 over South Branch of Towanda 21 Creek, Bridge Replacement 550,000 22 (Base Construction Allocation - 23 $495,000) 24 (Design and Contingencies - $55,000) 25 (16) Monroe Township, T-412, County Bridge 26 No.20 over South Branch of Towanda 27 Creek, Bridge Replacement 700,000 28 (Base Construction Allocation - 29 $630,000) 30 (Design and Contingencies - $70,000) 19990S0504B1019 - 86 -
1 (17) GRANVILLE TOWNSHIP, T-326, BRIDGE <-- 2 OVER NORTH BRANCH TOWANDA CREEK, BRIDGE 3 REPLACEMENT 700,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $575,000) 6 (LAND ALLOCATION - $25,000) 7 (DESIGN AND CONTINGENCIES - $100,000) 8 (18) MONROE TOWNSHIP, T-402, SOUTH BRIDGE 9 OVER TOWANDA CREEK, BRIDGE REPLACEMENT 1,080,000 10 (BASE CONSTRUCTION ALLOCATION - 11 $900,000) 12 (LAND ALLOCATION - $30,000) 13 (DESIGN AND CONTINGENCIES - $150,000) 14 (19) NORTH TOWANDA TOWNSHIP, T-545, BRIDGE 15 OVER SUGAR CREEK, BRIDGE REPLACEMENT 1,140,000 16 (BASE CONSTRUCTION ALLOCATION - 17 $960,000) 18 (LAND ALLOCATION - $30,000) 19 (DESIGN AND CONTINGENCIES - $150,000) 20 (b) State Bridges 21 (1) SR 0006, North Bridge over Sugar 22 Creek, South of Longs Pond Road, Bridge 23 Replacement 1,139,000 24 (Base Construction Allocation - 25 $911,000) 26 (Land Allocation - $57,000) 27 (Design and Contingencies - $171,000) 28 (2) SR 0409, Billing Creek Bridge, Village 29 of Camptown, Bridge Replacement 318,000 30 (Base Construction Allocation - 19990S0504B1019 - 87 -
1 $254,000) 2 (Land Allocation - $16,000) 3 (Design and Contingencies - $48,000) 4 (3) SR 3029, Towanda Creek Bridges between 5 T-327 and T-326 on Gulf Road, Village 6 of Granville Center, Bridge 7 Replacement 593,000 8 (Base Construction Allocation - 9 $474,000) 10 (Land Allocation - $30,000) 11 (Design and Contingencies - $89,000) 12 (4) SR 4008, Bridge over Tributary of 13 Sugar Creek, Columbia Township, Bridge 14 Replacement 298,000 15 (Base Construction Allocation - 16 $238,000) 17 (Land Allocation - $15,000) 18 (Design and Contingencies - $45,000) 19 (5) SR 0414, Bridge over Towanda Creek, 20 Bradford Borough, Bridge Painting 195,000 21 (Base Construction Allocation - 22 $185,000) 23 (Design and Contingencies - $10,000) 24 (6) US 6, US 6 over Sugar Creek, Sylvania 25 Borough, Bridge Replacement 633,000 26 (Base Construction Allocation - 27 $506,000) 28 (Land Allocation - $32,000) 29 (Design and Contingencies - $95,000) 30 (7) SR 0014, SR 0014 over Tributary of 19990S0504B1019 - 88 -
1 Sugar Creek, Troy Township, Bridge 2 Replacement 410,000 3 (Base Construction Allocation - 4 $280,000) 5 (Land Allocation - $30,000) 6 (Design and Contingencies - $100,000) 7 (8) SR 0187, SR 0187 over Wappasening 8 Creek, Windham Township, Bridge 9 Replacement 2,000,000 10 (Base Construction Allocation - 11 $1,600,000) 12 (Land Allocation - $100,000) 13 (Design and Contingencies - $300,000) 14 (9) SR 0414, SR 0414 over Tributary of 15 Towanda Creek, Canton Township, Bridge 16 Replacement 320,000 17 (Base Construction Allocation - 18 $256,000) 19 (Land Allocation - $16,000) 20 (Design and Contingencies - $48,000) 21 (10) SR 0467, SR 0467 over Johnsons Creek, 22 Orwell Township, Bridge Replacement 751,000 23 (Base Construction Allocation - 24 $601,000) 25 (Land Allocation - $37,000) 26 (Design and Contingencies - $113,000) 27 (11) SR 0514, SR 0514 over North Branch of 28 Towanda Creek, Granville Township, 29 Bridge Replacement 638,000 30 (Base Construction Allocation - 19990S0504B1019 - 89 -
1 $510,000) 2 (Land Allocation - $32,000) 3 (Design and Contingencies - $96,000) 4 (12) SR 1022, Ulster Bridge, Ulster 5 Township, Bridge Painting 6,299,000 6 (Base Construction Allocation - 7 $5,039,000) 8 (Land Allocation - $315,000) 9 (Design and Contingencies - $945,000) 10 (13) SR 1026, SR 1026 over Wyalusing 11 Creek, Pike Township, Bridge 12 Replacement 650,000 13 (Base Construction Allocation - 14 $520,000) 15 (Land Allocation - $30,000) 16 (Design and Contingencies - $100,000) 17 (14) SR 1049, SR 1049 over Tributary of 18 Pendleton Creek, Warren Township, 19 Bridge Replacement 340,000 20 (Base Construction Allocation - 21 $270,000) 22 (Land Allocation - $15,000) 23 (Design and Contingencies - $55,000) 24 (15) SR 1055, SR 1055 over Parks Creek, 25 Rome Township, Bridge Replacement 315,000 26 (Base Construction Allocation - 27 $250,000) 28 (Land Allocation - $15,000) 29 (Design and Contingencies - $50,000) 30 (16) SR 2018, SR 2018 over Tributary of 19990S0504B1019 - 90 -
1 Susquehanna River, Asylum Township, 2 Bridge Replacement 260,000 3 (Base Construction Allocation - 4 $208,000) 5 (Land Allocation - $39,000) 6 (Design and Contingencies - $13,000) 7 (17) SR 3005, SR 3005 over Towanda Creek, 8 Canton Township, Bridge Replacement 666,000 9 (Base Construction Allocation - 10 $533,000) 11 (Land Allocation - $33,000) 12 (Design and Contingencies - $100,000) 13 (18) SR 3029, SR 3029 over Mud Creek, Troy 14 Township, Bridge Replacement 457,000 15 (Base Construction Allocation - 16 $366,000) 17 (Land Allocation - $23,000) 18 (Design and Contingencies - $68,000) 19 (19) SR 4002, SR 4002 over Browns Creek, 20 Burlington Township, Bridge 21 Replacement 561,000 22 (Base Construction Allocation - 23 $449,000) 24 (Land Allocation - $28,000) 25 (Design and Contingencies - $84,000) 26 (20) SR 4013, SR 4013 over Justice Run, 27 Ridgebury Township, Bridge Replacement 351,000 28 (Base Construction Allocation - 29 $281,000) 30 (Land Allocation - $18,000) 19990S0504B1019 - 91 -
1 (Design and Contingencies - $52,000) 2 (21) SR 4014, SR 4014 over Branch of 3 Tomjack Creek, Smithfield Township, 4 Bridge Replacement 360,000 5 (Base Construction Allocation - 6 $288,000) 7 (Land Allocation - $18,000) 8 (Design and Contingencies - $54,000) 9 (22) SR 4015, SR 4015 over Mill Creek, 10 Springfield Township, Bridge 11 Replacement 390,000 12 (Base Construction Allocation - 13 $312,000) 14 (Land Allocation - $20,000) 15 (Design and Contingencies - $58,000) 16 (23) SR 4031, SR 4031 over Tributary of 17 Beckwith Creek, Wells Township, Bridge 18 Replacement 243,000 19 (Base Construction Allocation - 20 $196,000) 21 (Land Allocation - $10,000) 22 (Design and Contingencies - $37,000) 23 (24) SR 2024, Bridge over Towanda Creek, 24 Towanda Township, Bridge Replacement 1,740,000 25 (Base Construction Allocation - 26 $1,400,000) 27 (Land Allocation - $40,000) 28 (Design and Contingencies - $300,000) 29 (25) SR 4015, Bridge over Mill Creek, 30 Springfield Township, Bridge 19990S0504B1019 - 92 -
1 Replacement 740,000 2 (Base Construction Allocation - 3 $600,000) 4 (Land Allocation - $20,000) 5 (Design and Contingencies - $120,000) 6 (26) PA 514, Bridge over North Branch of 7 Towanda Creek, Granville Township, 8 Bridge Replacement 630,000 9 (Base Construction Allocation - 10 $500,000) 11 (Land Allocation - $30,000) 12 (Design and Contingencies - $100,000) 13 (27) US 6, Bridge over Sugar Creek, 14 Sylvania Borough, Bridge Replacement 680,000 15 (Base Construction Allocation - 16 $550,000) 17 (Land Allocation - $30,000) 18 (Design and Contingencies - $100,000) 19 (28) PA 549, Bridge over Daggett Creek, 20 Wells Township, Bridge Replacement 1,180,000 21 (Base Construction Allocation - 22 $950,000) 23 (Land Allocation - $30,000) 24 (Design and Contingencies - $200,000) 25 (29) SR 4002, Bridge over Browns Creek, 26 Burlington Township, Bridge 27 Replacement 560,000 28 (Base Construction Allocation - 29 $450,000) 30 (Land Allocation - $30,000) 19990S0504B1019 - 93 -
1 (Design and Contingencies - $80,000) 2 (30) SR 1026, Bridge over Wyalusing Creek, 3 Pike Township, Bridge Replacement 650,000 4 (Base Construction Allocation - 5 $520,000) 6 (Land Allocation - $30,000) 7 (Design and Contingencies - $100,000) 8 (31) PA 187, Bridge over Wappasening 9 Creek, Windham Township, Bridge 10 Replacement 2,000,000 11 (Base Construction Allocation - 12 $1,600,000) 13 (Land Allocation - $100,000) 14 (Design and Contingencies - $300,000) 15 (32) PA 199, Bridge over Chemung River 16 Overflow Channel, Athens Township, 17 Bridge Replacement 2,000,000 18 (Base Construction Allocation - 19 $1,600,000) 20 (Land Allocation - $100,000) 21 (Design and Contingencies - $300,000) 22 (33) US 220, Bridge over Bridge Street, 23 Towanda Borough, Bridge Rehabilitation 385,000 24 (Base Construction Allocation - 25 $350,000) 26 (Design and Contingencies - $35,000) 27 (34) US 220, Bridge over SR 3020, Towanda 28 Township, Bridge Rehabilitation 495,000 29 (Base Construction Allocation - 30 $450,000) 19990S0504B1019 - 94 -
1 (Design and Contingencies - $45,000) 2 (35) US 220, Bridge over SR 2036, North 3 Towanda Township, Bridge 4 Rehabilitation 715,000 5 (Base Construction Allocation - 6 $650,000) 7 (Design and Contingencies - $65,000) 8 (36) US 220, Bridge over SR 3022, North 9 Towanda Township, Bridge 10 Rehabilitation 770,000 11 (Base Construction Allocation - 12 $700,000) 13 (Design and Contingencies - $70,000) 14 (37) US 220, Bridge over US 6, North 15 Towanda Township, Bridge 16 Reconstruction 1,700,000 17 (Base Construction Allocation - 18 $1,500,000) 19 (Design and Contingencies - $200,000) 20 (38) SR 0409, Camp Creek Box Culvert over 21 Camp Creek, Wyalusing Township, Bridge 22 Replacement 1,150,000 23 (Base Construction Allocation - 24 $750,000) 25 (Land Allocation - $200,000) 26 (Design and Contingencies - $200,000) 27 (39) SR 1022, Ulster River Bridge over 28 Susquehanna River, Ulster Township and 29 Sheshequin Township, Bridge 30 Replacement 16,000,000 19990S0504B1019 - 95 -
1 (Base Construction Allocation - 2 $12,800,000) 3 (Land Allocation - $800,000) 4 (Design and Contingencies - $2,400,000) 5 Section 13. Bucks County. 6 (a) Local Bridges 7 (1) Springfield Township, I-479, Bridge 8 Street Bridge over Cooks Creek, Bridge 9 Replacement 500,000 10 (Base Construction Allocation - 11 $365,000) 12 (Land Allocation - $35,000) 13 (Design and Contingencies - $100,000) 14 (2) Springfield Township, T-404, Hawks 15 Mill County Bridge No.196, Shale Road 16 over Cooks Creek, Bridge 17 Rehabilitation 100,000 18 (Base Construction Allocation - 19 $90,000) 20 (Design and Contingencies - $10,000) 21 (3) BRISTOL TOWNSHIP, RANDALL AVENUE OVER <-- 22 CONRAIL, BRIDGE REPLACEMENT 5,750,000 23 (BASE CONSTRUCTION ALLOCATION - 24 $5,000,000) 25 (DESIGN AND CONTINGENCIES - $750,000) 26 (4) BEDMINSTER TOWNSHIP, T-376, BRIDGE 27 OVER EAST BRANCH PERKIOMEN CREEK, 28 BRIDGE REPLACEMENT 544,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $430,000) 19990S0504B1019 - 96 -
1 (LAND ALLOCATION - $4,000) 2 (DESIGN AND CONTINGENCIES - $110,000) 3 (5) BRISTOL BOROUGH, JEFFERSON AVENUE 4 BRIDGE OVER DELAWARE CANAL, BRIDGE 5 REPLACEMENT 500,000 6 (BASE CONSTRUCTION ALLOCATION - 7 $450,000) 8 (DESIGN AND CONTINGENCIES - $50,000) 9 (6) EAST ROCKHILL TOWNSHIP, T-362, BRIDGE 10 OVER EAST BRANCH PERKIOMEN CREEK, 11 BRIDGE REPLACEMENT 539,000 12 (BASE CONSTRUCTION ALLOCATION - 13 $425,000) 14 (LAND ALLOCATION - $4,000) 15 (DESIGN AND CONTINGENCIES - $110,000) 16 (7) FALLS TOWNSHIP, WHEATSHEF ROAD BRIDGE 17 OVER DELAWARE CANAL, BRIDGE 18 REPLACEMENT 700,000 19 (8) PLUMSTEAD TOWNSHIP, T-340, BRIDGE OVER 20 NORTH BRANCH NESHAMINY, BRIDGE 21 REPLACEMENT 550,000 22 (BASE CONSTRUCTION ALLOCATION - 23 $425,000) 24 (LAND ALLOCATION - $4,000) 25 (DESIGN AND CONTINGENCIES - $121,000) 26 (9) TINICUM TOWNSHIP, T-439, BRIDGE OVER 27 BEAVER CREEK, BRIDGE REPLACEMENT 560,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $435,000) 30 (LAND ALLOCATION - $5,000) 19990S0504B1019 - 97 -
1 (DESIGN AND CONTINGENCIES - $120,000) 2 (10) TINICUM/BEDMINSTER, T-427, BRIDGE 3 OVER TOHICKON CREEK, BRIDGE 4 REPLACEMENT 565,000 5 (BASE CONSTRUCTION ALLOCATION - 6 $445,000) 7 (LAND ALLOCATION - $5,000) 8 (DESIGN AND CONTINGENCIES - $115,000) 9 (11) BENSALEM/PHILADELPHIA, T-316, BRIDGE 10 OVER POQUESSING CREEK, BRIDGE 11 REPLACEMENT 840,000 12 (BASE CONSTRUCTION ALLOCATION - 13 $700,000) 14 (LAND ALLOCATION - $10,000) 15 (DESIGN AND CONTINGENCIES - $130,000) 16 (b) State Bridges 17 (1) SR 0032, River Road at Fleecydale over 18 Paunacussing Creek, Solebury Township, 19 Bridge Replacement 1,400,000 20 (Base Construction Allocation - 21 $1,200,000) 22 (Design and Contingencies - $200,000) 23 (2) SR 2002, Otter Street Bridge over 24 Otter Creek, Bristol Borough, Bridge 25 Replacement 1,150,000 26 (Base Construction Allocation - 27 $900,000) 28 (Land Allocation - $50,000) 29 (Design and Contingencies - $200,000) 30 (3) SR 2025, Bristol Road Bridge over 19990S0504B1019 - 98 -
1 Little Neshaminy Creek, Warwick 2 Township, Bridge Replacement 1,120,000 3 (Base Construction Allocation - 4 $900,000) 5 (Land Allocation - $80,000) 6 (Design and Contingencies - $140,000) 7 (4) SR 2047, Hulmeville Avenue Bridge over 8 Conrail, Middletown, Bridge 9 Replacement 5,600,000 10 (Base Construction Allocation - 11 $4,000,000) 12 (Land Allocation - $800,000) 13 (Design and Contingencies - $800,000) 14 (5) SR 4033, Upper Ridge Road Bridge over 15 Unami Creek, Milford Township, Bridge 16 Replacement 2,000,000 17 (Base Construction Allocation - 18 $1,600,000) 19 (Land Allocation - $100,000) 20 (Design and Contingencies - $300,000) 21 (6) SR 4091, Kellers Church Road Bridge 22 over Deep Run, Bedminster, Bridge 23 Replacement 2,000,000 24 (Base Construction Allocation - 25 $1,500,000) 26 (Land Allocation - $150,000) 27 (Design and Contingencies - $350,000) 28 (7) SR 0202, Doylestown Bypass (Five 29 Bridges) over SR 0611, Doylestown 30 Township, Bridge Rehabilitations 2,200,000 19990S0504B1019 - 99 -
1 (Base Construction Allocation - 2 $2,000,000) 3 (Land Allocation - $50,000) 4 (Design and Contingencies - $150,000) 5 (8) SR 0611, Easton Road (Two Bridges) 6 over Tohickon and Deep Run Creeks, 7 Bedminister Township, Bridge 8 Replacements 1,650,000 9 (Base Construction Allocation - 10 $1,500,000) 11 (Land Allocation - $50,000) 12 (Design and Contingencies - $100,000) 13 (9) SR 2089, Almshouse Road Bridge over 14 Neshaminy Creek, Doylestown Township, 15 Bridge Replacement 1,800,000 16 (Base Construction Allocation - 17 $1,500,000) 18 (Land Allocation - $150,000) 19 (Design and Contingencies - $150,000) 20 (10) SR 0013, Bristol Pike over Otter 21 Creek, Bristol Township, Bridge 22 Replacement 1,600,000 23 (Base Construction Allocation - 24 $1,200,000) 25 (Land Allocation - $100,000) 26 (Design and Contingencies - $300,000) 27 (11) SR 0413, Bridge over Mill Creek, 28 Bristol Township, Bridge Replacement 600,000 29 (Base Construction Allocation - 30 $350,000) 19990S0504B1019 - 100 -
1 (Land Allocation - $50,000) 2 (Design and Contingencies - $200,000) 3 (12) SR 2002, State Road over Neshaminy 4 Creek, Bristol Township, Bridge 5 Replacement 3,700,000 6 (Base Construction Allocation - 7 $3,000,000) 8 (Land Allocation - $250,000) 9 (Design and Contingencies - $450,000) 10 (13) SR 0013, Bristol Pike over St. 11 Francis Creek, Bensalem Township, 12 Bridge Replacement 550,000 13 (Base Construction Allocation - 14 $400,000) 15 (Land Allocation - $50,000) 16 (Design and Contingencies - $100,000) 17 (14) SR 0013, SR 0013 over Conrail and 18 Newbold Road, Falls Township, Bridge 19 Replacement 5,000,000 20 (Base Construction Allocation - 21 $4,500,000) 22 (Land Allocation - $150,000) 23 (Design and Contingencies - $350,000) 24 (15) SR 0032, West Bridge Street over 25 Tributary of Delaware River, 26 Morrisville Borough, Bridge 27 Replacement 550,000 28 (Base Construction Allocation - 29 $400,000) 30 (Land Allocation - $50,000) 19990S0504B1019 - 101 -
1 (Design and Contingencies - $100,000) 2 (16) SR 0213, West Maple Avenue over 3 Neshaminy Creek, Middletown Township, 4 Bridge Replacement 2,000,000 5 (Base Construction Allocation - 6 $1,700,000) 7 (Land Allocation - $100,000) 8 (Design and Contingencies - $200,000) 9 (17) SR 1004, Cold Spring Creamery Road 10 over Branch of Pine Run Creek, 11 Buckingham Township, Bridge 12 Replacement 450,000 13 (Base Construction Allocation - 14 $380,000) 15 (Land Allocation - $10,000) 16 (Design and Contingencies - $60,000) 17 (18) SR 2005, Cornwells Avenue over 18 Poquessing Creek, Bensalem Township, 19 Bridge Replacement 350,000 20 (Base Construction Allocation - 21 $250,000) 22 (Land Allocation - $25,000) 23 (Design and Contingencies - $75,000) 24 (19) SR 2026, Trenton Avenue over Rock 25 Run, Falls Township, Bridge 26 Replacement 700,000 27 (Base Construction Allocation - 28 $500,000) 29 (Land Allocation - $50,000) 30 (Design and Contingencies - $150,000) 19990S0504B1019 - 102 -
1 (20) SR 2037, Lincoln Highway Eastbound 2 over Queen Anne Creek, Falls Township, 3 Bridge Replacement 700,000 4 (Base Construction Allocation - 5 $500,000) 6 (Land Allocation - $75,000) 7 (Design and Contingencies - $125,000) 8 (21) SR 2037, Lincoln Highway over Branch 9 of Queen Anne Creek, Falls Township, 10 Bridge Replacement 500,000 11 (Base Construction Allocation - 12 $350,000) 13 (Land Allocation - $50,000) 14 (Design and Contingencies - $100,000) 15 (22) SR 2047, Hulmeville Avenue over 16 Conrail, Middletown Township, Bridge 17 Replacement 1,200,000 18 (Base Construction Allocation - 19 $1,000,000) 20 (Land Allocation - $75,000) 21 (Design and Contingencies - $125,000) 22 (23) SR 2065, Bustleton Pike/Ironworks 23 over Ironworks Creek, Northampton 24 Township, Bridge Rehabilitation 260,000 25 (Base Construction Allocation - 26 $200,000) 27 (Land Allocation - $10,000) 28 (Design and Contingencies - $50,000) 29 (24) GREEN LANE BRIDGE OVER DELAWARE <-- 30 CANAL, BRISTOL BOROUGH, BRIDGE 19990S0504B1019 - 103 -
1 REPLACEMENT 200,000 2 (25) SR 0013, BRIDGE OVER DELAWARE CANAL, 3 BRISTOL TOWNSHIP, BRIDGE REPLACEMENT 2,500,000 4 (26) HAINES ROAD BRIDGE OVER DELAWARE 5 CANAL, BRISTOL TOWNSHIP, BRIDGE 6 REPLACEMENT 700,000 7 (27) SR 2033, BRIDGE OVER DELAWARE CANAL, 8 BRISTOL TOWNSHIP, BRIDGE REPLACEMENT 200,000 9 (28) AIRPORT ROAD BRIDGE OVER DELAWARE 10 CANAL, BRISTOL TOWNSHIP, BRIDGE 11 REPLACEMENT 500,000 12 (29) SR 0001, BRIDGE OVER DELAWARE CANAL, 13 FALLS TOWNSHIP, BRIDGE REPLACEMENT 300,000 14 (30) SR 2020, BRIDGE OVER DELAWARE CANAL, 15 FALLS TOWNSHIP, BRIDGE REPLACEMENT 3,000,000 16 (31) MILL CREEK ROAD BRIDGE OVER DELAWARE 17 CANAL, FALLS TOWNSHIP, BRIDGE 18 REPLACEMENT 700,000 19 (32) SR 2031, BRIDGE OVER DELAWARE CANAL, 20 FALLS TOWNSHIP, BRIDGE REPLACEMENT 800,000 21 (33) SR 2033, BRIDGE OVER DELAWARE CANAL, 22 FALLS TOWNSHIP, BRIDGE REPLACEMENT 200,000 23 (34) SR 0013, BRIDGE OVER DELAWARE CANAL, 24 FALLS TOWNSHIP, BRIDGE REPLACEMENT 2,500,000 25 (35) SR 0032, BRIDGE OVER TRIBUTARY OF 26 DELAWARE RIVER, MORRISVILLE BOROUGH, 27 BRIDGE REPLACEMENT 700,000 28 Section 14. Butler County. 29 (a) Local Bridges 30 (1) Muddy Creek and Worth Townships, T- 19990S0504B1019 - 104 -
1 348, Muddy Creek Bridge over Muddy 2 Creek, Bridge Replacement 730,000 3 (Base Construction Allocation - 4 $550,000) 5 (Land Allocation - $15,000) 6 (Design and Contingencies - $165,000) 7 (2) Allegheny Township, T-542, Farrington 8 Bridge, Bridge Replacement 700,000 9 (Base Construction Allocation - 10 $500,000) 11 (Land Allocation - $25,000) 12 (Design and Contingencies - $175,000) 13 (3) Concord Township, T-508, Greece City 14 Bridge, Bridge Replacement 700,000 15 (Base Construction Allocation - 16 $500,000) 17 (Land Allocation - $25,000) 18 (Design and Contingencies - $175,000) 19 (4) Cranberry Township, T-326 over Brush 20 Creek, Bridge Replacement 700,000 21 (Base Construction Allocation - 22 $500,000) 23 (Land Allocation - $25,000) 24 (Design and Contingencies - $175,000) 25 (5) Cranberry Township, T-300, Bridge 26 Replacement 700,000 27 (Base Construction Allocation - 28 $500,000) 29 (Land Allocation - $25,000) 30 (Design and Contingencies - $175,000) 19990S0504B1019 - 105 -
1 (6) Jackson Township, T-323, Senn Bridge, 2 Bridge Replacement 700,000 3 (Base Construction Allocation - 4 $500,000) 5 (Land Allocation - $25,000) 6 (Design and Contingencies - $175,000) 7 (7) Jackson Township, T-325, Eidewau 8 Bridge, Bridge Replacement 700,000 9 (Base Construction Allocation - 10 $500,000) 11 (Land Allocation - $25,000) 12 (Design and Contingencies - $175,000) 13 (8) Jefferson Township, T-844 over Thorn 14 Creek, Bridge Replacement 700,000 15 (Base Construction Allocation - 16 $500,000) 17 (Land Allocation - $25,000) 18 (Design and Contingencies - $175,000) 19 (9) Mars Borough, Hook Street, Bridge 20 Replacement 700,000 21 (Base Construction Allocation - 22 $500,000) 23 (Land Allocation - $25,000) 24 (Design and Contingencies - $175,000) 25 (10) Mars Borough, Church Street, Kocher 26 Bridge, Bridge Replacement 700,000 27 (Base Construction Allocation - 28 $500,000) 29 (Land Allocation - $25,000) 30 (Design and Contingencies - $175,000) 19990S0504B1019 - 106 -
1 (11) Middlesex Township, T-380 over Glade 2 Run, Bridge Replacement 700,000 3 (Base Construction Allocation - 4 $500,000) 5 (Land Allocation - $25,000) 6 (Design and Contingencies - $175,000) 7 (12) Worth Township, T-318, Payne Bridge, 8 Bridge Replacement 700,000 9 (Base Construction Allocation - 10 $500,000) 11 (Land Allocation - $25,000) 12 (Design and Contingencies - $175,000) 13 (13) Cranberry Township, T-326 over 14 Tributary of Brush Creek, Bridge 15 Replacement 167,000 16 (Base Construction Allocation - 17 $135,000) 18 (Land Allocation - $19,000) 19 (Design and Contingencies - $13,000) 20 (14) Adams Township, T-391, Brickey and 21 Hill Bridge over Breakneck Creek, 22 Bridge Replacement 600,000 23 (15) Butler City, T-319, Brady Street 24 Bridge, Bridge Replacement 300,000 25 (16) Allegheny Township, T-538, County 26 Bridge No.4, Squaw Valley Bridge No.1, 27 Bridge Replacement 500,000 28 (17) Mercer Township, T-434, County Bridge 29 No.7, Harrisville Bridge, Bridge 30 Replacement 500,000 19990S0504B1019 - 107 -
1 (18) Marion Township, T-434 County Bridge 2 No.9, Wassum Bridge, Bridge 3 Replacement 500,000 4 (19) Venango Township, T-649, County 5 Bridge No.10, Lane Bridge, Bridge 6 Replacement 500,000 7 (20) Parker Township, T-638, County Bridge 8 No.12, Snake Bridge, Bridge 9 Replacement 500,000 10 (21) Parker Township, T-632, County Bridge 11 No.13, Old Iron Bridge, Bridge 12 Replacement 500,000 13 (22) Slippery Rock Township, T-381, County 14 Bridge No.25, Grossman Bridge, Bridge 15 Replacement 600,000 16 (23) Cherry Township, T-428, County Bridge 17 No.26, Duffy Bridge, Bridge 18 Replacement 600,000 19 (24) Cherry Township, T-535, County Bridge 20 No.28, Findley Bridge, Bridge 21 Replacement 500,000 22 (25) Cherry Township, T-416, County Bridge 23 No.29, Christy Bridge No.2, Bridge 24 Replacement 500,000 25 (26) Cherry Township, T-560, County Bridge 26 No.32, Bridge Replacement 700,000 27 (27) Washington Township, T-504, County 28 Bridge No.35, Campbell Bridge, Bridge 29 Replacement 500,000 30 (28) Washington Township, T-452, County 19990S0504B1019 - 108 -
1 Bridge No.36, Hilliard Bridge, Bridge 2 Replacement 500,000 3 (29) Fairview Township, T-636, County 4 Bridge No.39, Murtland Bridge, Bridge 5 Replacement 600,000 6 (30) Fairview Township, T-676, County 7 Bridge No.42, Burk Bridge, Bridge 8 Replacement 600,000 9 (31) Clay Township, T-416, County Bridge 10 No.48, R. C. Miller Bridge, Bridge 11 Replacement 500,000 12 (32) Clay Township, T-414, County Bridge 13 No.49, Muddycreek Bridge, Bridge 14 Replacement 600,000 15 (33) Brady Township, T-368, County Bridge 16 No.52, McCracken Bridge, Bridge 17 Replacement 600,000 18 (34) Brady Township, T-456, County Bridge 19 No.53, Wigton Bridge, Bridge 20 Replacement 500,000 21 (35) Brady Township, T-414, County Bridge 22 No.54, Frank Hall Bridge, Bridge 23 Replacement 500,000 24 (36) Muddycreek Township, T-348, County 25 Bridge No.59, Book Bridge, Bridge 26 Replacement 500,000 27 (37) Worth Township, T-318, County Bridge 28 No.60, Payne Bridge No.2, Bridge 29 Replacement 500,000 30 (38) Muddycreek Township, T-357, County 19990S0504B1019 - 109 -
1 Bridge No.62, Flinner Bridge, Bridge 2 Replacement 500,000 3 (39) Summit Township, T-584, County Bridge 4 No.70, Wadsworth Bridge, Bridge 5 Replacement 600,000 6 (40) Clearfield Township, T-630, County 7 Bridge No.77, McBride Bridge No.2, 8 Bridge Replacement 600,000 9 (41) Clearfield Township, T-630, County 10 Bridge No.78, McBride Bridge No.1, 11 Bridge Replacement 600,000 12 (42) Clearfield Bridge, T-578, County 13 Bridge No.79, Schuler Bridge, Bridge 14 Replacement 600,000 15 (43) Clearfield Township, T-691, County 16 Bridge, No.80, Humes Bridge, Bridge 17 Replacement 500,000 18 (44) Connoquenessing Township, T-431, 19 County Bridge No.82, McGinnis Bridge, 20 Bridge Replacement 700,000 21 (45) Connoquennessing Township, T-427, 22 County Bridge No.84, Hays Bridge, 23 Bridge Replacement 600,000 24 (46) Conoquennessing Township, T-340, 25 County Bridge No.86, Kniess Bridge, 26 Bridge Replacement 600,000 27 (47) Franklin Township, T-439, County 28 Bridge No.87, Martin Bridge, Bridge 29 Replacement 600,000 30 (48) Lancaster Township, T-338, County 19990S0504B1019 - 110 -
1 Bridge No.90, Drushel Bridge, Bridge 2 Replacement 600,000 3 (49) Lancaster Township, T-339, County 4 Bridge No.93, Eichenauer Bridge, Bridge 5 Replacement 500,000 6 (50) Jackson Township, T-323, County 7 Bridge No.97, Senn Bridge, Bridge 8 Replacement 600,000 9 (51) Zelienople Borough, Market Street, 10 County Bridge No.99, Iron City Bridge, 11 Bridge Replacement 600,000 12 (52) Forward Township, T-407, County 13 Bridge No.105, Martin Bridge, Bridge 14 Replacement 600,000 15 (53) Forward Township, T-423, County 16 Bridge No.106, Mardica Bridge, Bridge 17 Replacement 600,000 18 (54) Clinton Township, T-570, County 19 Bridge No.118, Hemphill Bridge, Bridge 20 Replacement 600,000 21 (55) Clinton Township, T-572, County 22 Bridge No.120, Cunningham Bridge, 23 Bridge Replacement 600,000 24 (56) Clinton Township, T-554, County 25 Bridge No.122, Brickyard Hill Bridge, 26 Bridge Replacement 500,000 27 (57) Clinton Township, T-552, County 28 Bridge No.123, Wiley Bridge, Bridge 29 Replacement 500,000 30 (58) Mars Borough, T-396, County Bridge 19990S0504B1019 - 111 -
1 No.133, Mars Bridge, Bridge 2 Replacement 600,000 3 (59) Adams Township, T-401, County Bridge 4 No.137, Rosebaugh Bridge, Bridge 5 Replacement 700,000 6 (60) Adams Township, T-403, County Bridge 7 No.138, Hays Bridge, Bridge 8 Replacement 600,000 9 (61) Middlesex Township, T-485, County 10 Bridge No.141, Steiner Bridge, Bridge 11 Replacement 500,000 12 (62) Middlesex Township, T-380, County 13 Bridge No.142, Glade Run Bridge, Bridge 14 Replacement 600,000 15 (63) Middlesex Township, T-384, County 16 Bridge No.144, Rifley Bridge, Bridge 17 Replacement 600,000 18 (64) Callery Borough, Main Street, County 19 Bridge No.149, Ringeisen Bridge, Bridge 20 Replacement 600,000 21 (65) ADAMS TOWNSHIP, ROSEBAUGH BRIDGE OVER <-- 22 SOUTH BRANCH GLADE RUN, BRIDGE 23 REPLACEMENT 705,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $500,000) 26 (LAND ALLOCATION - $75,000) 27 (DESIGN AND CONTINGENCIES - $130,000) 28 (66) ADAMS TOWNSHIP, BRICKYARD HILL BRIDGE 29 OVER BREAKNECK CREEK, BRIDGE 30 REPLACEMENT 410,000 19990S0504B1019 - 112 -
1 (BASE CONSTRUCTION ALLOCATION - 2 $300,000) 3 (LAND ALLOCATION - $30,000) 4 (DESIGN AND CONTINGENCIES - $80,000) 5 (67) ADAMS TOWNSHIP, T-396, BRIDGE OVER 6 BREAKNECK CREEK, BRIDGE REPLACEMENT 500,000 7 (68) ALLEGHENY TOWNSHIP, T-538, BRIDGE 8 OVER LOWERY RUN, BRIDGE REPLACEMENT 500,000 9 (69) BUFFALO TOWNSHIP, T-578, BRIDGE OVER 10 SARVER RUN, BRIDGE REPLACEMENT 500,000 11 (70) BUFFALO TOWNSHIP, T-671, BRIDGE OVER 12 TRIBUTARY OF BUFFALO CREEK, BRIDGE 13 REPLACEMENT 500,000 14 (71) BULL CREEK, T-572, BRIDGE OVER BULL 15 CREEK, BRIDGE REPLACEMENT 500,000 16 (72) CENTER TOWNSHIP, T-500, BRIDGE OVER 17 CONNOQUENESSING CREEK, BRIDGE 18 REPLACEMENT 500,000 19 (73) CHERRY TOWNSHIP, T-537, BRIDGE OVER 20 SOUTH BRANCH SLIPPERY RUN, BRIDGE 21 REPLACEMENT 500,000 22 (74) CHERRY TOWNSHIP, T-428, BRIDGE OVER 23 MCMURRAY RUN, BRIDGE REPLACEMENT 500,000 24 (75) CHERRY VALLEY BOROUGH, T-528, BRIDGE 25 OVER SCRUB GRASS CREEK, BRIDGE 26 REPLACEMENT 500,000 27 (76) CITY OF BUTLER, MERCER STREET BRIDGE 28 OVER SULLIVAN RUN, BRIDGE REPLACEMENT 300,000 29 (77) CITY OF BUTLER, MILLER STREET BRIDGE 30 OVER SULLIVAN RUN, BRIDGE REPLACEMENT 300,000 19990S0504B1019 - 113 -
1 (78) CITY OF BUTLER, SOUTH MONROE STREET 2 BRIDGE OVER CONNOQUENESSING CREEK, 3 BRIDGE REHABILITATION 80,000 4 (79) CITY OF BUTLER, NORTH 6TH AVENUE 5 BRIDGE OVER SULLIVAN RUN, BRIDGE 6 REHABILITATION 40,000 7 (80) CLAY TOWNSHIP, T-458, BRIDGE OVER 8 MUDDY CREEK, BRIDGE REPLACEMENT 500,000 9 (81) CLAY TOWNSHIP, T-531, BRIDGE OVER 10 CLAYTONIA RUN, BRIDGE REPLACEMENT 500,000 11 (82) CLEARFIELD TOWNSHIP, T-595, BRIDGE 12 OVER BUFFALO CREEK, BRIDGE REPLACEMENT 500,000 13 (83) CLEARFIELD TOWNSHIP, T-627, BRIDGE 14 OVER LITTLE BUFFALO RUN, BRIDGE 15 REPLACEMENT 500,000 16 (84) CLEARFIELD TOWNSHIP, T-578, BRIDGE 17 OVER LITTLE BUFFALO RUN, BRIDGE 18 REPLACEMENT 500,000 19 (85) CLINTON TOWNSHIP, T-570, BRIDGE OVER 20 GOLDSCHEITTER CREEK, BRIDGE 21 REPLACEMENT 500,000 22 (86) CONCORD TOWNSHIP, T-621, BRIDGE OVER 23 ROBINSON RUN, BRIDGE REPLACEMENT 500,000 24 (87) CONCORD TOWNSHIP, T-502, BRIDGE OVER 25 TRIBUTARY OF CONNOQUENESSING CREEK, 26 BRIDGE REPLACEMENT 500,000 27 (88) FAIRVIEW TOWNSHIP, T-625, BRIDGE OVER 28 BEAR CREEK, BRIDGE REPLACEMENT 500,000 29 (89) FAIRVIEW TOWNSHIP, T-676, BRIDGE OVER 30 HAYS RUN, BRIDGE REPLACEMENT 500,000 19990S0504B1019 - 114 -
1 (90) FAIRVIEW TOWNSHIP, T-636, BRIDGE OVER 2 BEAR CREEK, BRIDGE REPLACEMENT 500,000 3 (91) FORWARD TOWNSHIP, T-407, BRIDGE OVER 4 GLADE RUN, BRIDGE REPLACEMENT 500,000 5 (92) FRANK HALL, T-414, BRIDGE OVER 6 HALLSTON RUN, BRIDGE REPLACEMENT 500,000 7 (93) GLADE RUN, T-423, BRIDGE OVER GLADE 8 RUN, BRIDGE REPLACEMENT 500,000 9 (94) LANCASTER TOWNSHIP, T-338, BRIDGE 10 OVER LITTLE YELLOW CREEK, BRIDGE 11 REPLACEMENT 500,000 12 (95) MARION TOWNSHIP, T-476, BRIDGE OVER 13 TRIBUTARY OF SLIPPERY ROCK CREEK, 14 BRIDGE REPLACEMENT 500,000 15 (96) MARS BOROUGH, CROWE STREET BRIDGE 16 OVER BREAKNECK CREEK, BRIDGE 17 REPLACEMENT 500,000 18 (97) MERCER TOWNSHIP, T-467, BRIDGE OVER 19 MCMURRY RUN, BRIDGE REPLACEMENT 500,000 20 (98) MUDDY CREEK, T-416, BRIDGE OVER MUDDY 21 CREEK, BRIDGE REPLACEMENT 500,000 22 (99) OAKLAND TOWNSHIP, T-620, BRIDGE OVER 23 BONNIE BROOK, BRIDGE REPLACEMENT 500,000 24 (100) OAKLAND TOWNSHIP, T-603, BRIDGE OVER 25 BONNIE BROOK, BRIDGE REPLACEMENT 500,000 26 (101) PARKER TOWNSHIP, T-638, BRIDGE OVER 27 SILVER CREEK, BRIDGE REPLACEMENT 500,000 28 (102) PARKER TOWNSHIP, T-723, BRIDGE OVER 29 BEAR CREEK, BRIDGE REPLACEMENT 500,000 30 (103) PENN TOWNSHIP, T-495, BRIDGE OVER 19990S0504B1019 - 115 -
1 ROBINSON RUN, BRIDGE REPLACEMENT 500,000 2 (104) SLIPPERY ROCK TOWNSHIP, T-381, 3 BRIDGE OVER KEIFER RUN, BRIDGE 4 REPLACEMENT 500,000 5 (105) VENANGO TOWNSHIP, T-649, BRIDGE OVER 6 MURRIN RUN, BRIDGE REPLACEMENT 500,000 7 (106) WASHINGTON TOWNSHIP, T-504, BRIDGE 8 OVER CHRISTY RUN, BRIDGE REPLACEMENT 500,000 9 (107) WASHINGTON TOWNSHIP, T-506, BRIDGE 10 OVER NORTH BRANCH SLIPPERY RUN, BRIDGE 11 REPLACEMENT 500,000 12 (108) WASHINGTON TOWNSHIP, T-504, BRIDGE 13 OVER CHRISTY RUN, BRIDGE REPLACEMENT 500,000 14 (109) WINFIELD TOWNSHIP, T-626, BRIDGE 15 OVER ROUGH RUN, BRIDGE REPLACEMENT 500,000 16 (110) WORTH TOWNSHIP, T-373, BRIDGE OVER 17 TRIBUTARY OF MUDDY CREEK, BRIDGE 18 REPLACEMENT 500,000 19 (111) WORTH TOWNSHIP, T-377, BRIDGE OVER 20 BLACK RUN, BRIDGE REPLACEMENT 500,000 21 (b) State Bridges 22 (1) SR 0228, Houseville Bridge over B & LE 23 Railroad, Clinton Township, Bridge Deck 24 Replacement 636,000 25 (Base Construction Allocation - 26 $600,000) 27 (Design and Contingencies - $36,000) 28 (2) SR 0019, Rose Point Bridge over SR 29 0422, Muddycreek Township, Bridge 30 Painting 115,000 19990S0504B1019 - 116 -
1 (Base Construction Allocation - 2 $100,000) 3 (Design and Contingencies - $15,000) 4 (3) SR 0058, Blocks Run Bridge No.1 over 5 Blocks Run, Marion Township, Bridge 6 Painting 65,000 7 (Base Construction Allocation - 8 $50,000) 9 (Design and Contingencies - $15,000) 10 (4) SR 0058, Blocks Run Bridge No.2 over 11 Blocks Run, Venango Township, Bridge 12 Painting 60,000 13 (Base Construction Allocation - 14 $45,000) 15 (Design and Contingencies - $15,000) 16 (5) SR 0058, Murrin Run Bridge over Murrin 17 Run, Venango Township, Bridge Painting 60,000 18 (Base Construction Allocation - 19 $45,000) 20 (Design and Contingencies - $15,000) 21 (6) SR 0068, Glade Run Bridge over Glade 22 Run, Zelienople Borough, Bridge 23 Painting 70,000 24 (Base Construction Allocation - 25 $55,000) 26 (Design and Contingencies - $15,000) 27 (7) SR 0079, Muddy Creek Bridge Northbound 28 over SR 0422 and Muddy Creek, Muddy 29 Creek Township, Bridge Painting 255,000 30 (Base Construction Allocation - 19990S0504B1019 - 117 -
1 $240,000) 2 (Design and Contingencies - $15,000) 3 (8) SR 0079, Muddy Creek Bridge Southbound 4 over SR 0422 and Muddy Creek, Muddy 5 Creek Township, Bridge Painting 255,000 6 (Base Construction Allocation - 7 $240,000) 8 (Design and Contingencies - $15,000) 9 (9) SR 0108, Slippery Rock Exit Bridge 10 over I-79, Worth Township, Bridge 11 Painting 225,000 12 (Base Construction Allocation - 13 $210,000) 14 (Design and Contingencies - $15,000) 15 (10) SR 0138, Glades Wildlife Lake Bridge 16 over South Branch of Slippery Rock 17 Creek, Concord Township, Bridge 18 Painting 85,000 19 (Base Construction Allocation - 20 $70,000) 21 (Design and Contingencies - $15,000) 22 (11) SR 0258, Wolf Creek Bridge over Wolf 23 Creek, Slippery Rock Township, Bridge 24 Painting 125,000 25 (Base Construction Allocation - 26 $110,000) 27 (Design and Contingencies - $15,000) 28 (12) SR 0308, Renick Bridge over Stoney 29 Run and Railroad, Center Township, 30 Bridge Painting 405,000 19990S0504B1019 - 118 -
1 (Base Construction Allocation - 2 $390,000) 3 (Design and Contingencies - $15,000) 4 (13) SR 0422, Mount Chestnut Bridge 5 Eastbound over Little Connoquenessing 6 Creek and SR 3007, Butler Township, 7 Bridge Painting 355,000 8 (Base Construction Allocation - 9 $340,000) 10 (Design and Contingencies - $15,000) 11 (14) SR 0422, Bonnie Brook Bridge over 12 Bonnie Brook, Summit Township, Bridge 13 Painting 90,000 14 (Base Construction Allocation - 15 $75,000) 16 (Design and Contingencies - $15,000) 17 (15) SR 1004, Bruin Bridge over Bear 18 Creek, Bruin Borough, Bridge Painting 85,000 19 (Base Construction Allocation - 20 $70,000) 21 (Design and Contingencies - $15,000) 22 (16) SR 1011, Rattigan Bridge No.1 over 23 Buffalo Creek, Donegal Township, Bridge 24 Painting 55,000 25 (Base Construction Allocation - 26 $40,000) 27 (Design and Contingencies - $15,000) 28 (17) SR 1016, Eastland Drive Bridge over 29 Connoquenessing Creek, Butler Township, 30 Bridge Painting 80,000 19990S0504B1019 - 119 -
1 (Base Construction Allocation - 2 $65,000) 3 (Design and Contingencies - $15,000) 4 (18) SR 1019, Rough Run Bridge over Rough 5 Run, Windfield Township, Bridge 6 Painting 95,000 7 (Base Construction Allocation - 8 $80,000) 9 (Design and Contingencies - $15,000) 10 (19) SR 1019, Chicora Bridge over Buffalo 11 Creek, Chicora Borough, Bridge 12 Painting 70,000 13 (Base Construction Allocation - 14 $55,000) 15 (Design and Contingencies - $15,000) 16 (20) SR 1021, Rattigan Bridge No.2 over 17 Buffalo Creek, Donegal Township, Bridge 18 Painting 70,000 19 (Base Construction Allocation - 20 $55,000) 21 (Design and Contingencies - $15,000) 22 (21) SR 1025, Bonnie Brook Bridge No.1 23 over Bonnie Brook, Summit Township, 24 Bridge Painting 90,000 25 (Base Construction Allocation - 26 $75,000) 27 (Design and Contingencies - $15,000) 28 (22) SR 2004, Connoquenessing Creek Bridge 29 over Connoquenessing Creek, Butler 30 City, Bridge Painting 135,000 19990S0504B1019 - 120 -
1 (Base Construction Allocation - 2 $120,000) 3 (Design and Contingencies - $15,000) 4 (23) SR 2004, Bonnie Brook Bridge No.2 5 over Bonnie Brook, East Butler Borough, 6 Bridge Painting 90,000 7 (Base Construction Allocation - 8 $75,000) 9 (Design and Contingencies - $15,000) 10 (24) SR 2011, Lardintown Run Bridge No.1 11 over Lardintown Run, Clinton Township, 12 Bridge Painting 75,000 13 (Base Construction Allocation - 14 $60,000) 15 (Design and Contingencies - $15,000) 16 (25) SR 2011, Lardintown Run Bridge No.2 17 over Lardintown Run, Clinton Township, 18 Bridge Painting 65,000 19 (Base Construction Allocation - 20 $50,000) 21 (Design and Contingencies - $15,000) 22 (26) SR 2011, Lardintown Run Bridge No.3 23 over Lardintown Run, Clinton Township, 24 Bridge Painting 65,000 25 (Base Construction Allocation - 26 $50,000) 27 (Design and Contingencies - $15,000) 28 (27) SR 3004, McCalmont Bridge over 29 Connoquenessing Creek, Butler Township, 30 Bridge Painting 105,000 19990S0504B1019 - 121 -
1 (Base Construction Allocation - 2 $90,000) 3 (Design and Contingencies - $15,000) 4 (28) SR 3007, Reinfrew Bridge over 5 Connoquenessing Creek, Penn Township, 6 Bridge Painting 115,000 7 (Base Construction Allocation - 8 $100,000) 9 (Design and Contingencies - $15,000) 10 (29) SR 3010, Zeno Bridge over Glade Run, 11 Forward Township, Bridge Painting 105,000 12 (Base Construction Allocation - 13 $90,000) 14 (Design and Contingencies - $15,000) 15 (30) SR 3017, Kaufman Run Bridge over 16 Kaufman Run, Adams Township, Bridge 17 Painting 70,000 18 (Base Construction Allocation - 19 $55,000) 20 (Design and Contingencies - $15,000) 21 (31) SR 3017, Breakneck Creek Bridge over 22 Breakneck Creek, Adams Township, Bridge 23 Painting 105,000 24 (Base Construction Allocation - 25 $90,000) 26 (Design and Contingencies - $15,000) 27 (32) SR 3025, Little Connoquenessing Creek 28 Bridge over Little Connoquenessing 29 Creek, Lancaster Township, Bridge 30 Painting 125,000 19990S0504B1019 - 122 -
1 (Base Construction Allocation - 2 $110,000) 3 (Design and Contingencies - $15,000) 4 (33) SR 4006, Keister's Bridge over 5 Slippery Rock Creek, Slippery Rock 6 Township, Bridge Painting 105,000 7 (Base Construction Allocation - 8 $90,000) 9 (Design and Contingencies - $15,000) 10 (34) SR 4007, Lake Arthur Tributary Bridge 11 over a tributary of Lake Arthur, Worth 12 Township, Bridge Painting 50,000 13 (Base Construction Allocation - 14 $35,000) 15 (Design and Contingencies - $15,000) 16 (35) SR 4007, I-79 North Bridge No.1 over 17 I-79, Worth Township, Bridge Painting 245,000 18 (Base Construction Allocation - 19 $230,000) 20 (Design and Contingencies - $15,000) 21 (36) SR 4007, I-79 North Bridge No.2 over 22 I-79, Worth Township, Bridge Painting 215,000 23 (Base Construction Allocation - 24 $200,000) 25 (Design and Contingencies - $15,000) 26 (37) SR 4010, Bull Valley Bridge over Bull 27 Valley Creek, Washington Township, 28 Bridge Painting 65,000 29 (Base Construction Allocation - 30 $50,000) 19990S0504B1019 - 123 -
1 (Design and Contingencies - $15,000) 2 (38) SR 4012, Seaton Creek Bridge over 3 Seaton Creek, Marion Township, Bridge 4 Painting 65,000 5 (Base Construction Allocation - 6 $50,000) 7 (Design and Contingencies - $15,000) 8 (39) SR 8002, North Shore Exit Bridge over 9 Muddy Creek, Worth Township, Bridge 10 Painting 85,000 11 (Base Construction Allocation - 12 $70,000) 13 (Design and Contingencies - $15,000) 14 (40) SR 0422, Route 422 Overpass, 15 Muddycreek Township, Bridge 16 Replacement 1,450,000 17 (Base Construction Allocation - 18 $1,000,000) 19 (Land Allocation - $100,000) 20 (Design and Contingencies - $350,000) 21 (41) SR 0008, B&LE Railroad Overpass, 22 Mercer Township, Bridge Replacement 1,450,000 23 (Base Construction Allocation - 24 $1,000,000) 25 (Land Allocation - $100,000) 26 (Design and Contingencies - $350,000) 27 (42) SR 0038, B&LE Railroad Overpass, 28 Concord Township, Bridge Replacement 1,050,000 29 (Base Construction Allocation - 30 $750,000) 19990S0504B1019 - 124 -
1 (Land Allocation - $50,000) 2 (Design and Contingencies - $250,000) 3 (43) SR 2002, Conrail Railroad Overpass, 4 Summit Township, Bridge Replacement 1,050,000 5 (Base Construction Allocation - 6 $750,000) 7 (Land Allocation - $50,000) 8 (Design and Contingencies - $250,000) 9 (44) SR 2012, B&LE Railroad Overpass, 10 Jefferson Township, Bridge Replacement 1,050,000 11 (Base Construction Allocation - 12 $750,000) 13 (Land Allocation - $50,000) 14 (Design and Contingencies - $250,000) 15 (45) SR 3004, B&LE Railroad Overpass, 16 Butler Township, Bridge Replacement 595,000 17 (Base Construction Allocation - 18 $400,000) 19 (Land Allocation - $20,000) 20 (Design and Contingencies - $175,000) 21 (46) SR 0008, Bridge over Armco Private 22 Drive, Butler Township, Bridge 23 Replacement 1,450,000 24 (Base Construction Allocation - 25 $1,000,000) 26 (Land Allocation - $100,000) 27 (Design and Contingencies - $350,000) 28 (47) SR 0019, Scholars Run Bridge, Jackson 29 Township, Bridge Replacement 1,050,000 30 (Base Construction Allocation - 19990S0504B1019 - 125 -
1 $750,000) 2 (Land Allocation - $50,000) 3 (Design and Contingencies - $250,000) 4 (48) SR 0019, SR 0019 over SR 0422, 5 Muddycreek Township, Bridge 6 Replacement 1,050,000 7 (Base Construction Allocation - 8 $750,000) 9 (Land Allocation - $50,000) 10 (Design and Contingencies - $250,000) 11 (49) SR 0058, McMurray Run Bridge, Marion 12 Township, Bridge Replacement 1,050,000 13 (Base Construction Allocation - 14 $750,000) 15 (Land Allocation - $50,000) 16 (Design and Contingencies - $250,000) 17 (50) SR 0068, Sullivan Run Bridge, Butler 18 Township, Bridge Replacement 1,450,000 19 (Base Construction Allocation - 20 $1,000,000) 21 (Land Allocation - $100,000) 22 (Design and Contingencies - $350,000) 23 (51) SR 0080, I-80 over TR 540, Allegheny 24 Township, Bridge Replacement 1,450,000 25 (Base Construction Allocation - 26 $1,000,000) 27 (Land Allocation - $100,000) 28 (Design and Contingencies - $350,000) 29 (52) SR 0138, Muddy Creek Bridge, Clay 30 Township, Bridge Replacement 595,000 19990S0504B1019 - 126 -
1 (Base Construction Allocation - 2 $400,000) 3 (Land Allocation - $20,000) 4 (Design and Contingencies - $175,000) 5 (53) SR 0173, Slippery Rock Creek Bridge, 6 Slippery Rock Township, Bridge 7 Replacement 1,050,000 8 (Base Construction Allocation - 9 $750,000) 10 (Land Allocation - $50,000) 11 (Design and Contingencies - $250,000) 12 (54) SR 0079, I-79 North Bridge over Ramp, 13 Jackson Township, Bridge Replacement 1,450,000 14 (Base Construction Allocation - 15 $1,000,000) 16 (Land Allocation - $100,000) 17 (Design and Contingencies - $350,000) 18 (55) SR 0079, I-79 South Bridge over Ramp, 19 Jackson Township, Bridge Replacement 1,450,000 20 (Base Construction Allocation - 21 $1,000,000) 22 (Land Allocation - $100,000) 23 (Design and Contingencies - $350,000) 24 (56) SR 0079, I-79 over SR 0068, Jackson 25 Township, Bridge Replacement 1,450,000 26 (Base Construction Allocation - 27 $1,000,000) 28 (Land Allocation - $100,000) 29 (Design and Contingencies - $350,000) 30 (57) SR 0079, I-79 over TR 347, Lancaster 19990S0504B1019 - 127 -
1 Township, Bridge Replacement 1,450,000 2 (Base Construction Allocation - 3 $1,000,000) 4 (Land Allocation - $100,000) 5 (Design and Contingencies - $350,000) 6 (58) SR 0079, I-79 North Bridge over SR 7 0422, Worth Township, Bridge 8 Replacement 1,450,000 9 (Base Construction Allocation - 10 $1,000,000) 11 (Land Allocation - $100,000) 12 (Design and Contingencies - $350,000) 13 (59) SR 0079, I-79 South Bridge over SR 14 0422, Worth Township, Bridge 15 Replacement 1,450,000 16 (Base Construction Allocation - 17 $1,000,000) 18 (Land Allocation - $100,000) 19 (Design and Contingencies - $350,000) 20 (60) SR 0422, SR 0422 over SR 4005, 21 Muddycreek Township, Bridge 22 Replacement 1,450,000 23 (Base Construction Allocation - 24 $1,000,000) 25 (Land Allocation - $100,000) 26 (Design and Contingencies - $350,000) 27 (61) SR 0528, SR 0528 over SR 0422, 28 Franklin Township, Bridge Replacement 1,050,000 29 (Base Construction Allocation - 30 $750,000) 19990S0504B1019 - 128 -
1 (Land Allocation - $50,000) 2 (Design and Contingencies - $250,000) 3 (62) SR 1010, Bear Creek Bridge, Fairview 4 Township, Bridge Replacement 1,050,000 5 (Base Construction Allocation - 6 $750,000) 7 (Land Allocation - $50,000) 8 (Design and Contingencies - $250,000) 9 (63) SR 1014, Bonnie Brook Bridge over 10 Bonnie Brook, Summit Township, Bridge 11 Replacement 595,000 12 (Base Construction Allocation - 13 $400,000) 14 (Land Allocation - $20,000) 15 (Design and Contingencies - $175,000) 16 (64) SR 1016, Connoquenessing Creek 17 Bridge, Summit Township, Bridge 18 Replacement 595,000 19 (Base Construction Allocation - 20 $400,000) 21 (Land Allocation - $20,000) 22 (Design and Contingencies - $175,000) 23 (65) SR 2006, SR 2006 over SR 0422, Summit 24 Township, Bridge Replacement 1,050,000 25 (Base Construction Allocation - 26 $750,000) 27 (Land Allocation - $50,000) 28 (Design and Contingencies - $250,000) 29 (66) SR 2010, Bridge over Branch of Thorn 30 Creek, Jefferson Township, Bridge 19990S0504B1019 - 129 -
1 Replacement 1,050,000 2 (Base Construction Allocation - 3 $750,000) 4 (Land Allocation - $50,000) 5 (Design and Contingencies - $250,000) 6 (67) SR 2010, Little Buffalo Creek Bridge, 7 Winfield Township, Bridge Replacement 1,050,000 8 (Base Construction Allocation - 9 $750,000) 10 (Land Allocation - $50,000) 11 (Design and Contingencies - $250,000) 12 (68) SR 2011, Bridge over Branch of Bull 13 Creek, Clinton Township, Bridge 14 Replacement 595,000 15 (Base Construction Allocation - 16 $400,000) 17 (Land Allocation - $20,000) 18 (Design and Contingencies - $175,000) 19 (69) SR 2011, Little Bull Run Bridge No.4 20 over Bull Run, Clinton Township, Bridge 21 Replacement 595,000 22 (Base Construction Allocation - 23 $400,000) 24 (Land Allocation - $20,000) 25 (Design and Contingencies - $175,000) 26 (70) SR 2018, Bridge No.1 over Branch of 27 Buffalo Creek, Winfield Township, 28 Bridge Replacement 1,050,000 29 (Base Construction Allocation - 30 $750,000) 19990S0504B1019 - 130 -
1 (Land Allocation - $50,000) 2 (Design and Contingencies - $250,000) 3 (71) SR 2018, Bridge No.2 over Branch of 4 Buffalo Creek, Winfield Township, 5 Bridge Replacement 1,050,000 6 (Base Construction Allocation - 7 $750,000) 8 (Land Allocation - $50,000) 9 (Design and Contingencies - $250,000) 10 (72) SR 3025, Little Connoquenessing Creek 11 Bridge, Lancaster Township, Bridge 12 Replacement 595,000 13 (Base Construction Allocation - 14 $400,000) 15 (Land Allocation - $20,000) 16 (Design and Contingencies - $175,000) 17 (73) SR 4007, SR 4007 over SR 0422, Worth 18 Township, Bridge Replacement 1,050,000 19 (Base Construction Allocation - 20 $750,000) 21 (Land Allocation - $50,000) 22 (Design and Contingencies - $250,000) 23 (74) SR 4007, Park Road Bridge, Worth 24 Township, Bridge Replacement 1,050,000 25 (Base Construction Allocation - 26 $750,000) 27 (Land Allocation - $50,000) 28 (Design and Contingencies - $250,000) 29 (75) SR 4010, Long Run Bridge, Slippery 30 Rock Township, Bridge Replacement 595,000 19990S0504B1019 - 131 -
1 (Base Construction Allocation - 2 $400,000) 3 (Land Allocation - $20,000) 4 (Design and Contingencies - $175,000) 5 (76) SR 8005, SR 8005 over SR 0019, 6 Jackson Township, Bridge Replacement 595,000 7 (Base Construction Allocation - 8 $400,000) 9 (Land Allocation - $20,000) 10 (Design and Contingencies - $175,000) 11 (77) SR 0008, William Flynn Bridge, 12 Middlesex Township, Bridge Replacement 1,450,000 13 (Base Construction Allocation - 14 $1,000,000) 15 (Land Allocation - $100,000) 16 (Design and Contingencies - $350,000) 17 (78) SR 0008, Glade Run Bridge, Middlesex 18 Township, Bridge Rehabilitation 1,450,000 19 (Base Construction Allocation - 20 $1,000,000) 21 (Land Allocation - $100,000) 22 (Design and Contingencies - $350,000) 23 (79) SR 0008, Little Glade Run Bridge 24 No.1, Middlesex Township, Bridge 25 Rehabilitation 1,450,000 26 (Base Construction Allocation - 27 $1,000,000) 28 (Land Allocation - $100,000) 29 (Design and Contingencies - $350,000) 30 (80) SR 0008, Little Glade Run Bridge 19990S0504B1019 - 132 -
1 No.2, Middlesex Township, Bridge 2 Rehabilitation 1,450,000 3 (Base Construction Allocation - 4 $1,000,000) 5 (Land Allocation - $100,000) 6 (Design and Contingencies - $350,000) 7 (81) SR 0008, Glade Run Bridge No.2, 8 Middlesex Township, Bridge 9 Rehabilitation 1,450,000 10 (Base Construction Allocation - 11 $1,000,000) 12 (Land Allocation - $100,000) 13 (Design and Contingencies - $350,000) 14 (82) SR 0008, Bulcher Run Bridge, Butler 15 Township, Bridge Rehabilitation 1,450,000 16 (Base Construction Allocation - 17 $1,000,000) 18 (Land Allocation - $100,000) 19 (Design and Contingencies - $350,000) 20 (83) SR 0008, Bridge No.2 over Branch of 21 Muddy Creek, Clay Township, Bridge 22 Rehabilitation 1,450,000 23 (Base Construction Allocation - 24 $1,000,000) 25 (Land Allocation - $100,000) 26 (Design and Contingencies - $350,000) 27 (84) SR 0008, Muddy Creek Bridge, Clay 28 Township, Bridge Rehabilitation 1,450,000 29 (Base Construction Allocation - 30 $1,000,000) 19990S0504B1019 - 133 -
1 (Land Allocation - $100,000) 2 (Design and Contingencies - $350,000) 3 (85) SR 0008, Glade Run Bridge No.3, Brady 4 Township, Bridge Rehabilitation 1,450,000 5 (Base Construction Allocation - 6 $1,000,000) 7 (Land Allocation - $100,000) 8 (Design and Contingencies - $350,000) 9 (86) SR 0008, McDonalds Run Bridge, Mercer 10 Township, Bridge Replacement 1,450,000 11 (Base Construction Allocation - 12 $1,000,000) 13 (Land Allocation - $100,000) 14 (Design and Contingencies - $350,000) 15 (87) SR 0008, McMurray Run Bridge, Mercer 16 Township, Bridge Rehabilitation 1,450,000 17 (Base Construction Allocation - 18 $1,000,000) 19 (Land Allocation - $100,000) 20 (Design and Contingencies - $350,000) 21 (88) SR 0019, Glade Run Bridge No.2, 22 Jackson Township, Bridge 23 Rehabilitation 1,050,000 24 (Base Construction Allocation - 25 $750,000) 26 (Land Allocation - $50,000) 27 (Design and Contingencies - $250,000) 28 (89) SR 0019, Glade Run Bridge No.2, 29 Jackson Township, Bridge 30 Rehabilitation 1,050,000 19990S0504B1019 - 134 -
1 (Base Construction Allocation - 2 $750,000) 3 (Land Allocation - $50,000) 4 (Design and Contingencies - $250,000) 5 (90) SR 0038, Connoquenessing Creek 6 Bridge, Center Township, Bridge 7 Rehabilitation 1,050,000 8 (Base Construction Allocation - 9 $750,000) 10 (Land Allocation - $50,000) 11 (Design and Contingencies - $250,000) 12 (91) SR 0038, Pine Run Bridge, Oakland 13 Township, Bridge Rehabilitation 1,050,000 14 (Base Construction Allocation - 15 $750,000) 16 (Land Allocation - $50,000) 17 (Design and Contingencies - $250,000) 18 (92) SR 0038, Concord Bridge, Concord 19 Township, Bridge Rehabilitation 1,050,000 20 (Base Construction Allocation - 21 $750,000) 22 (Land Allocation - $50,000) 23 (Design and Contingencies - $250,000) 24 (93) SR 0038, Little Connoquenessing Creek 25 Bridge No.1, Concord Township, Bridge 26 Rehabilitation 1,050,000 27 (Base Construction Allocation - 28 $750,000) 29 (Land Allocation - $50,000) 30 (Design and Contingencies - $250,000) 19990S0504B1019 - 135 -
1 (94) SR 0038, Little Connoquenessing Creek 2 Bridge, Concord Township, Bridge 3 Rehabilitation 1,050,000 4 (Base Construction Allocation - 5 $750,000) 6 (Land Allocation - $50,000) 7 (Design and Contingencies - $250,000) 8 (95) SR 0038, Little Scrubgrass Creek 9 Bridge, Allegheny Township, Bridge 10 Rehabilitation 1,050,000 11 (Base Construction Allocation - 12 $750,000) 13 (Land Allocation - $50,000) 14 (Design and Contingencies - $250,000) 15 (96) SR 0038, Bridge over Tributary of 16 Scrubgrass Creek, Allegheny Township, 17 Bridge Rehabilitation 1,050,000 18 (Base Construction Allocation - 19 $750,000) 20 (Land Allocation - $50,000) 21 (Design and Contingencies - $250,000) 22 (97) SR 0058, Murrin Run Bridge, Venango 23 Township, Bridge Rehabilitation 1,050,000 24 (Base Construction Allocation - 25 $750,000) 26 (Land Allocation - $50,000) 27 (Design and Contingencies - $250,000) 28 (98) SR 0068, B&LE Railroad Bridge, Summit 29 and Butler Townships, Bridge 30 Rehabilitation 1,450,000 19990S0504B1019 - 136 -
1 (Base Construction Allocation - 2 $1,000,000) 3 (Land Allocation - $100,000) 4 (Design and Contingencies - $350,000) 5 (99) SR 0068, Connoquenessing Creek 6 Bridge, Summit Township, Bridge 7 Rehabilitation 1,050,000 8 (Base Construction Allocation - 9 $750,000) 10 (Land Allocation - $50,000) 11 (Design and Contingencies - $250,000) 12 (100) SR 0068, Buffalo Creek Bridge, 13 Chicora Township, Bridge 14 Rehabilitation 1,050,000 15 (Base Construction Allocation - 16 $750,000) 17 (Land Allocation - $50,000) 18 (Design and Contingencies - $250,000) 19 (101) SR 0068, Buffalo Run Bridge, 20 Fairview Township, Bridge 21 Rehabilitation 1,050,000 22 (Base Construction Allocation - 23 $750,000) 24 (Land Allocation - $50,000) 25 (Design and Contingencies - $250,000) 26 (102) SR 0079, Bridge over Tributary of 27 Glade Run, Jackson Township, Bridge 28 Rehabilitation 1,450,000 29 (Base Construction Allocation - 30 $1,000,000) 19990S0504B1019 - 137 -
1 (Land Allocation - $100,000) 2 (Design and Contingencies - $350,000) 3 (103) SR 0079, Bridge No.1 over Branch of 4 Yellow Creek, Lancaster Township, 5 Bridge Rehabilitation 1,450,000 6 (Base Construction Allocation - 7 $1,000,000) 8 (Land Allocation - $100,000) 9 (Design and Contingencies - $350,000) 10 (104) SR 0079, Bridge No.2 over Branch of 11 Yellow Creek, Lancaster Township, 12 Bridge Rehabilitation 1,450,000 13 (Base Construction Allocation - 14 $1,000,000) 15 (Land Allocation - $100,000) 16 (Design and Contingencies - $350,000) 17 (105) SR 0079, Bridge No.3 over Branch of 18 Yellow Creek, Lancaster Township, 19 Bridge Rehabilitation 1,450,000 20 (Base Construction Allocation - 21 $1,000,000) 22 (Land Allocation - $100,000) 23 (Design and Contingencies - $350,000) 24 (106) SR 0079, Little Yellow Creek Bridge, 25 Lancaster Township, Bridge 26 Rehabilitation 1,450,000 27 (Base Construction Allocation - 28 $1,000,000) 29 (Land Allocation - $100,000) 30 (Design and Contingencies - $350,000) 19990S0504B1019 - 138 -
1 (107) SR 0079, Bridge No.4 over Branch of 2 Yellow Creek, Muddycreek Township, 3 Bridge Rehabilitation 1,450,000 4 (Base Construction Allocation - 5 $1,000,000) 6 (Land Allocation - $100,000) 7 (Design and Contingencies - $350,000) 8 (108) SR 0079, Bridge at Milepost 100, 9 Worth Township, Bridge Rehabilitation 1,450,000 10 (Base Construction Allocation - 11 $1,000,000) 12 (Land Allocation - $100,000) 13 (Design and Contingencies - $350,000) 14 (109) SR 0079, Black Run Bridge, Worth 15 Township, Bridge Rehabilitation 1,450,000 16 (Base Construction Allocation - 17 $1,000,000) 18 (Land Allocation - $100,000) 19 (Design and Contingencies - $350,000) 20 (110) SR 0268, Bridge over Branch of Bear 21 Creek, Petrolia Borough, Bridge 22 Rehabilitation 1,050,000 23 (Base Construction Allocation - 24 $750,000) 25 (Land Allocation - $50,000) 26 (Design and Contingencies - $250,000) 27 (111) SR 0268, Lowrey Run Bridge, 28 Allegheny Township, Bridge 29 Rehabilitation 1,050,000 30 (Base Construction Allocation - 19990S0504B1019 - 139 -
1 $750,000) 2 (Land Allocation - $50,000) 3 (Design and Contingencies - $250,000) 4 (112) SR 0308, B&LE Railroad Bridge, 5 Center Township, Bridge Rehabilitation 1,050,000 6 (Base Construction Allocation - 7 $750,000) 8 (Land Allocation - $50,000) 9 (Design and Contingencies - $250,000) 10 (113) SR 0308, Stony Run Bridge, Center 11 Township, Bridge Rehabilitation 1,050,000 12 (Base Construction Allocation - 13 $750,000) 14 (Land Allocation - $50,000) 15 (Design and Contingencies - $250,000) 16 (114) SR 0356, Little Buffalo Creek 17 Bridge, Buffalo Township, Bridge 18 Rehabilitation 1,050,000 19 (Base Construction Allocation - 20 $750,000) 21 (Land Allocation - $50,000) 22 (Design and Contingencies - $250,000) 23 (115) SR 0356, Big Coal Run Bridge, Summit 24 Township, Bridge Rehabilitation 1,050,000 25 (Base Construction Allocation - 26 $750,000) 27 (Land Allocation - $50,000) 28 (Design and Contingencies - $250,000) 29 (116) SR 0422, Lake Arthur Bridge, 30 Franklin Township, Bridge 19990S0504B1019 - 140 -
1 Rehabilitation 1,450,000 2 (Base Construction Allocation - 3 $1,000,000) 4 (Land Allocation - $100,000) 5 (Design and Contingencies - $350,000) 6 (117) SR 0422, Big Run Bridge, Franklin 7 Township, Bridge Rehabilitation 1,450,000 8 (Base Construction Allocation - 9 $1,000,000) 10 (Land Allocation - $100,000) 11 (Design and Contingencies - $350,000) 12 (118) SR 0422, Mulligan Run Bridge, 13 Franklin Township, Bridge 14 Rehabilitation 1,450,000 15 (Base Construction Allocation - 16 $1,000,000) 17 (Land Allocation - $100,000) 18 (Design and Contingencies - $350,000) 19 (119) SR 0422, Big Mulligan Run Bridge, 20 Franklin Township, Bridge 21 Rehabilitation 1,450,000 22 (Base Construction Allocation - 23 $1,000,000) 24 (Land Allocation - $100,000) 25 (Design and Contingencies - $350,000) 26 (120) SR 0422, Big Sullivan Run Bridge, 27 Butler Township, Bridge Rehabilitation 1,450,000 28 (Base Construction Allocation - 29 $1,000,000) 30 (Land Allocation - $100,000) 19990S0504B1019 - 141 -
1 (Design and Contingencies - $350,000) 2 (121) SR 0422, Connoquenessing Creek 3 Bridge, Butler Township, Bridge 4 Rehabilitation 1,450,000 5 (Base Construction Allocation - 6 $1,000,000) 7 (Land Allocation - $100,000) 8 (Design and Contingencies - $350,000) 9 (122) SR 0422, Bridge No.1 over Tributary 10 of Connoquenessing Creek, Summit 11 Township, Bridge Rehabilitation 1,450,000 12 (Base Construction Allocation - 13 $1,000,000) 14 (Land Allocation - $100,000) 15 (Design and Contingencies - $350,000) 16 (123) SR 0422, Bridge No.2 over Tributary 17 of Bonnie Brook, Butler Township, 18 Bridge Rehabilitation 1,450,000 19 (Base Construction Allocation - 20 $1,000,000) 21 (Land Allocation - $100,000) 22 (Design and Contingencies - $350,000) 23 (124) SR 0422, Bonnie Brook Bridge No.1, 24 Summit Township, Bridge Rehabilitation 1,450,000 25 (Base Construction Allocation - 26 $1,000,000) 27 (Land Allocation - $100,000) 28 (Design and Contingencies - $350,000) 29 (125) SR 0422, Bridge No.3 over Tributary 30 of Bonnie Brook, Summit Township, 19990S0504B1019 - 142 -
1 Bridge Rehabilitation 1,450,000 2 (Base Construction Allocation - 3 $1,000,000) 4 (Land Allocation - $100,000) 5 (Design and Contingencies - $350,000) 6 (126) SR 0422, Bonnie Brook Bridge No.2, 7 Summit Township, Bridge Rehabilitation 1,450,000 8 (Base Construction Allocation - 9 $1,000,000) 10 (Land Allocation - $100,000) 11 (Design and Contingencies - $350,000) 12 (127) SR 0422, Bridge No.4 over Tributary 13 of Bonnie Brook, Summit Township, 14 Bridge Rehabilitation 1,450,000 15 (Base Construction Allocation - 16 $1,000,000) 17 (Land Allocation - $100,000) 18 (Design and Contingencies - $350,000) 19 (128) SR 0422, Little Buffalo Creek 20 Bridge, Clearfield Township, Bridge 21 Rehabilitation 1,450,000 22 (Base Construction Allocation - 23 $1,000,000) 24 (Land Allocation - $100,000) 25 (Design and Contingencies - $350,000) 26 (129) SR 0422, Buffalo Creek Bridge, 27 Clearfield Township, Bridge 28 Rehabilitation 1,450,000 29 (Base Construction Allocation - 30 $1,000,000) 19990S0504B1019 - 143 -
1 (Land Allocation - $100,000) 2 (Design and Contingencies - $350,000) 3 (130) SR 0528, Likens Run Bridge, Evans 4 City Borough, Bridge Rehabilitation 1,050,000 5 (Base Construction Allocation - 6 $750,000) 7 (Land Allocation - $50,000) 8 (Design and Contingencies - $250,000) 9 (131) SR 1010, Glade Run Bridge, Brady 10 Township, Bridge Rehabilitation 595,000 11 (Base Construction Allocation - 12 $400,000) 13 (Land Allocation - $20,000) 14 (Design and Contingencies - $175,000) 15 (132) SR 1010, Big Bear Creek Bridge, 16 Fairview Township, Bridge 17 Rehabilitation 595,000 18 (Base Construction Allocation - 19 $400,000) 20 (Land Allocation - $20,000) 21 (Design and Contingencies - $175,000) 22 (133) SR 1011, Buffalo Creek Bridge, 23 Fairview Township, Bridge 24 Rehabilitation 595,000 25 (Base Construction Allocation - 26 $400,000) 27 (Land Allocation - $20,000) 28 (Design and Contingencies - $175,000) 29 (134) SR 1019, Big Buffalo Run Bridge, 30 Donegal Township, Bridge 19990S0504B1019 - 144 -
1 Rehabilitation 1,050,000 2 (Base Construction Allocation - 3 $750,000) 4 (Land Allocation - $50,000) 5 (Design and Contingencies - $250,000) 6 (135) SR 1025, Bonnie Brook Bridge, Summit 7 Township, Bridge Rehabilitation 1,050,000 8 (Base Construction Allocation - 9 $750,000) 10 (Land Allocation - $50,000) 11 (Design and Contingencies - $250,000) 12 (136) SR 2002, Coal Run Bridge, City of 13 Butler and Butler Township, Bridge 14 Rehabilitation 1,050,000 15 (Base Construction Allocation - 16 $750,000) 17 (Land Allocation - $50,000) 18 (Design and Contingencies - $250,000) 19 (137) SR 2004, Bonnie Brook Bridge, Summit 20 Township, Bridge Rehabilitation 1,050,000 21 (Base Construction Allocation - 22 $750,000) 23 (Land Allocation - $50,000) 24 (Design and Contingencies - $250,000) 25 (138) SR 2012, Thorn Creek Bridge No.1, 26 Jefferson Township, Bridge 27 Rehabilitation 1,050,000 28 (Base Construction Allocation - 29 $750,000) 30 (Land Allocation - $50,000) 19990S0504B1019 - 145 -
1 (Design and Contingencies - $250,000) 2 (139) SR 2012, Thorn Creek Bridge No.2, 3 Jefferson Township, Bridge 4 Rehabilitation 1,050,000 5 (Base Construction Allocation - 6 $750,000) 7 (Land Allocation - $50,000) 8 (Design and Contingencies - $250,000) 9 (140) SR 3001, West Butler Creek Bridge, 10 Butler Township, Bridge Rehabilitation 1,450,000 11 (Base Construction Allocation - 12 $1,000,000) 13 (Land Allocation - $100,000) 14 (Design and Contingencies - $350,000) 15 (141) SR 3007, Thorn Creek Bridge, Butler 16 Township, Bridge Rehabilitation 1,050,000 17 (Base Construction Allocation - 18 $750,000) 19 (Land Allocation - $50,000) 20 (Design and Contingencies - $250,000) 21 (142) SR 3009, Cranberry Run Bridge, Penn 22 Township, Bridge Rehabilitation 595,000 23 (Base Construction Allocation - 24 $400,000) 25 (Land Allocation - $20,000) 26 (Design and Contingencies - $175,000) 27 (143) SR 3010, Saw Mill Run Bridge, Penn 28 Township, Bridge Rehabilitation 595,000 29 (Base Construction Allocation - 30 $400,000) 19990S0504B1019 - 146 -
1 (Land Allocation - $20,000) 2 (Design and Contingencies - $175,000) 3 (144) SR 3015, Bridge No.2 over Tributary 4 of Wolf Run, Forward Township, Bridge 5 Rehabilitation 1,050,000 6 (Base Construction Allocation - 7 $750,000) 8 (Land Allocation - $50,000) 9 (Design and Contingencies - $250,000) 10 (145) SR 3015, Bridge No.3 over Tributary 11 of Wolf Run, Forward Township, Bridge 12 Rehabilitation 1,050,000 13 (Base Construction Allocation - 14 $750,000) 15 (Land Allocation - $50,000) 16 (Design and Contingencies - $250,000) 17 (146) SR 3025, Bridge over Branch of 18 Yellow Creek, Lancaster Township, 19 Bridge Rehabilitation 595,000 20 (Base Construction Allocation - 21 $400,000) 22 (Land Allocation - $20,000) 23 (Design and Contingencies - $175,000) 24 (147) SR 3031, SR 3031 over US 422, Butler 25 Township, Bridge Rehabilitation 595,000 26 (Base Construction Allocation - 27 $400,000) 28 (Land Allocation - $20,000) 29 (Design and Contingencies - $175,000) 30 (148) SR 3034, Bridge over Branch of 19990S0504B1019 - 147 -
1 Semiconon, Prospect Borough, Bridge 2 Rehabilitation 595,000 3 (Base Construction Allocation - 4 $400,000) 5 (Land Allocation - $20,000) 6 (Design and Contingencies - $175,000) 7 (149) SR 4001, SR 4001 over US 422, Butler 8 Township, Bridge Rehabilitation 1,050,000 9 (Base Construction Allocation - 10 $750,000) 11 (Land Allocation - $50,000) 12 (Design and Contingencies - $250,000) 13 (150) SR 4002, Bridge over Branch of Muddy 14 Creek, Clay Township, Bridge 15 Rehabilitation 1,050,000 16 (Base Construction Allocation - 17 $750,000) 18 (Land Allocation - $50,000) 19 (Design and Contingencies - $250,000) 20 (151) T-716, Old Plank Road Bridge, Penn 21 Township, Bridge Replacement 390,000 22 (Base Construction Allocation - 23 $300,000) 24 (Land Allocation - $10,000) 25 (Design and Contingencies - $80,000) 26 (152) SR 3007, Crooked Run Bridge, Center 27 Township, Bridge Replacement 1,050,000 28 (Base Construction Allocation - 29 $750,000) 30 (Land Allocation - $50,000) 19990S0504B1019 - 148 -
1 (Design and Contingencies - $250,000) 2 (153) SR 3010, Glade Run Bridge, Forward 3 Township, Bridge Replacement 595,000 4 (Base Construction Allocation - 5 $400,000) 6 (Land Allocation - $20,000) 7 (Design and Contingencies - $175,000) 8 (154) SR 3013, Big Connoquenessing Bridge, 9 Forward Township, Bridge Replacement 595,000 10 (Base Construction Allocation - 11 $400,000) 12 (Land Allocation - $20,000) 13 (Design and Contingencies - $175,000) 14 (155) SR 0019, SR 0019 over Brush Creek, 15 Cranberry Township, Bridge Replacement 1,050,000 16 (Base Construction Allocation - 17 $800,000) 18 (Land Allocation - $75,000) 19 (Design and Contingencies - $175,000) 20 (156) SR 0079, SR 0079 over Big Brush 21 Creek, Cranberry Township, Bridge 22 Replacement 1,450,000 23 (Base Construction Allocation - 24 $1,100,000) 25 (Land Allocation - $75,000) 26 (Design and Contingencies - $275,000) 27 (157) SR 0079, SR 0079 over Coal Run, 28 Cranberry Township, Bridge Replacement 1,450,000 29 (Base Construction Allocation - 30 $1,100,000) 19990S0504B1019 - 149 -
1 (Land Allocation - $75,000) 2 (Design and Contingencies - $275,000) 3 (158) SR 0228, SR 0228 over CSX Railroad, 4 Adams Township, Bridge Replacement 1,450,000 5 (Base Construction Allocation - 6 $1,100,000) 7 (Land Allocation - $75,000) 8 (Design and Contingencies - $275,000) 9 (159) SR 3015, Breakneck Bridge, Adams 10 Township, Bridge Replacement 595,000 11 (Base Construction Allocation - 12 $400,000) 13 (Land Allocation - $20,000) 14 (Design and Contingencies - $175,000) 15 (160) SR 3022, SR 3022 over Brush Creek, 16 Cranberry Township, Bridge Replacement 1,050,000 17 (Base Construction Allocation - 18 $800,000) 19 (Land Allocation - $75,000) 20 (Design and Contingencies - $175,000) 21 (161) SR 3024, SR 3024 over Big Brush 22 Creek, Cranberry Township, Bridge 23 Replacement 595,000 24 (Base Construction Allocation - 25 $400,000) 26 (Land Allocation - $20,000) 27 (Design and Contingencies - $175,000) 28 (162) SR 0008, Bridge over US 422, Butler 29 Township, Bridge Rehabilitation 1,450,000 30 (Base Construction Allocation - 19990S0504B1019 - 150 -
1 $1,000,000) 2 (Land Allocation - $100,000) 3 (Design and Contingencies - $350,000) 4 (163) SR 0028, Bridge over SR 2017, 5 Buffalo Township, Bridge 6 Rehabilitation 1,450,000 7 (Base Construction Allocation - 8 $1,000,000) 9 (Land Allocation - $100,000) 10 (Design and Contingencies - $350,000) 11 (164) SR 0068, Chicora South Bridge No.2 12 over Buffalo Creek, Chicora Borough, 13 Bridge Replacement 610,000 14 (Base Construction Allocation - 15 $500,000) 16 (Land Allocation - $10,000) 17 (Design and Contingencies - $100,000) 18 (165) SR 0068, Chicora South Bridge No.1 19 over Tributary of Buffalo Creek, 20 Chicora Borough, Bridge Replacement 610,000 21 (Base Construction Allocation - 22 $500,000) 23 (Land Allocation - $10,000) 24 (Design and Contingencies - $100,000) 25 (166) SR 0228, Breakneck Creek Bridge over 26 Breakneck Creek, Adams Township, Bridge 27 Replacement 610,000 28 (Base Construction Allocation - 29 $500,000) 30 (Land Allocation - $10,000) 19990S0504B1019 - 151 -
1 (Design and Contingencies - $100,000) 2 (167) SR 1011, Bonnie Run Bridge over 3 Branch Bonnie Run, East Butler Borough, 4 Bridge Rehabilitation 590,000 5 (Base Construction Allocation - 6 $500,000) 7 (Land Allocation - $20,000) 8 (Design and Contingencies - $70,000) 9 (168) SR 1019, Rough Run Bridge over Rough 10 Run, Windfield Township, Bridge 11 Replacement 440,000 12 (Base Construction Allocation - 13 $350,000) 14 (Land Allocation - $20,000) 15 (Design and Contingencies - $70,000) 16 (169) SR 2006, Butler Interchange Bridge 17 Eastbound over US 422, Summit Township, 18 Bridge Replacement 2,500,000 19 (Base Construction Allocation - 20 $2,000,000) 21 (Land Allocation - $100,000) 22 (Design and Contingencies - $400,000) 23 (170) SR 4007, Muddy Creek Bridge over 24 Muddy Creek, Worth Township, Bridge 25 Replacement 820,000 26 (Base Construction Allocation - 27 $700,000) 28 (Land Allocation - $20,000) 29 (Design and Contingencies - $100,000) 30 (171) SR 4007, Bridge over I-79, Worth 19990S0504B1019 - 152 -
1 Township, Bridge Rehabilitation 1,050,000 2 (Base Construction Allocation - 3 $750,000) 4 (Land Allocation - $50,000) 5 (Design and Contingencies - $250,000) 6 (172) SR 4007, Bridge over I-79, Worth 7 Township, Bridge Rehabilitation 1,050,000 8 (Base Construction Allocation - 9 $750,000) 10 (Land Allocation - $50,000) 11 (Design and Contingencies - $250,000) 12 (173) SR 0528, BRIDGE (NORTHBOUND AND <-- 13 SOUTHBOUND) OVER I-79, JACKSON 14 TOWNSHIP, BRIDGE REHABILITATION 915,000 15 (BASE CONSTRUCTION ALLOCATION - 16 $750,000) 17 (LAND ALLOCATION - $25,000) 18 (DESIGN AND CONTINGENCIES - $140,000) 19 (174) PA 528, BRIDGE OVER I-79 SOUTHBOUND, 20 JACKSON TOWNSHIP, BRIDGE 21 REHABILITATION 183,000 22 (BASE CONSTRUCTION ALLOCATION - 23 $150,000) 24 (LAND ALLOCATION - $5,000) 25 (DESIGN AND CONTINGENCIES - $28,000) 26 (175) PA 528, BRIDGE OVER I-79 NORTHBOUND, 27 JACKSON TOWNSHIP, BRIDGE 28 REHABILITATION 183,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $150,000) 19990S0504B1019 - 153 -
1 (LAND ALLOCATION - $5,000) 2 (DESIGN AND CONTINGENCIES - $28,000) 3 (176) SR 3024, BRIDGE OVER BRANCH BRUSH 4 CREEK, CRANBERRY TOWNSHIP, BRIDGE 5 REPLACEMENT 515,000 6 (BASE CONSTRUCTION ALLOCATION - 7 $425,000) 8 (LAND ALLOCATION - $30,000) 9 (DESIGN AND CONTINGENCIES - $60,000) 10 Section 15. Cambria County 11 (a) Local Bridges 12 (1) Summerhill Township, T-346, Bridge 13 No.1, Howard Avenue over Beaverdam Run, 14 Bridge Replacement 450,000 15 (Base Construction Allocation - 16 $350,000) 17 (Design and Contingencies - $100,000) 18 (2) West Carroll Township, T-505 over 19 Blacklick Creek, Bridge Replacement 235,000 20 (Base Construction Allocation - 21 $200,000) 22 (Land Allocation - $10,000) 23 (Design and Contingencies - $25,000) 24 (3) West Carroll Township, T-626 over Fox 25 Run, Bridge Replacement 235,000 26 (Base Construction Allocation - 27 $200,000) 28 (Land Allocation - $10,000) 29 (Design and Contingencies - $25,000) 30 (b) State Bridges 19990S0504B1019 - 154 -
1 (1) SR 1030, Carl Road over Slate Lick 2 Creek, Clearfield Township, Bridge 3 Replacement 240,000 4 (Base Construction Allocation - 5 $200,000) 6 (Land Allocation - $10,000) 7 (Design and Contingencies - $30,000) 8 (2) SR 0271, Maple Avenue Bridge over 9 Little Conemaugh River and Conrail, 10 Phase II, City of Johnstown, Bridge 11 Painting 500,000 12 (Base Construction Allocation - 13 $500,000) 14 (3) SR 3033, PA 56 Detour Bridge over 15 Solomon Run, Richland Township, Bridge 16 Replacement 350,000 17 (Base Construction Allocation - 18 $250,000) 19 (Land Allocation - $15,000) 20 (Design and Contingencies - $85,000) 21 (4) SR 0403, Stonycreek Bridge over 22 Stonycreek River, City of Johnstown, 23 Bridge Replacement 3,600,000 24 (Base Construction Allocation - 25 $2,915,000) 26 (Land Allocation - $195,000) 27 (Design and Contingencies - $490,000) 28 (5) SR 3006, STONYCREEK BRIDGE OVER <-- 29 TRIBUTARY OF STONYCREEK RIVER, RICHLAND 30 TOWNSHIP, BRIDGE REHABILITATION 56,000 19990S0504B1019 - 155 -
1 (BASE CONSTRUCTION ALLOCATION - 2 $41,000) 3 (LAND ALLOCATION - $1,000) 4 (DESIGN AND CONTINGENCIES - $14,000) 5 (6) SR 4010, BRUBAKER BRIDGE OVER BRUBAKER 6 RUN, HASTINGS BOROUGH, BRIDGE 7 REHABILITATION 50,000 8 (BASE CONSTRUCTION ALLOCATION - 9 $36,000) 10 (LAND ALLOCATION - $1,000) 11 (DESIGN AND CONTINGENCIES - $13,000) 12 (7) SR 1001, EBENSBURG BRIDGE OVER HOWELLS 13 RUN, EBENSBURG BOROUGH, BRIDGE 14 REHABILITATION 350,000 15 (BASE CONSTRUCTION ALLOCATION - 16 $300,000) 17 (LAND ALLOCATION - $1,000) 18 (DESIGN AND CONTINGENCIES - $49,000) 19 Section 16. Cameron County. 20 (a) Local Bridges 21 (1) Shippen Township, T-345, Hercules 22 Hollow Bridge over West Creek, Bridge 23 Replacement 760,000 24 (Base Construction Allocation - 25 $600,000) 26 (Land Allocation - $10,000) 27 (Design and Contingencies - $150,000) 28 (2) Grove Township, T-355, Bridge over 29 Upper Jerry Run, Bridge Replacement 224,000 30 (Base Construction Allocation - 19990S0504B1019 - 156 -
1 $160,000) 2 (Land Allocation - $8,000) 3 (Design and Contingencies - $56,000) 4 (b) State Bridges 5 (1) SR 0120, Bridge over Still House Run, 6 Lumber Township, Bridge Replacement 400,000 7 (Base Construction Allocation - 8 $250,000) 9 (Land Allocation - $50,000) 10 (Design and Contingencies - $100,000) 11 (2) SR 4004, Bridge over Driftwood Branch, 12 Shippen Township, Bridge Painting 115,000 13 (Base Construction Allocation - 14 $110,000) 15 (Design and Contingencies - $5,000) 16 (3) SR 4004, Elk Fork Bridge over 17 Driftwood Branch, Shippen Township, 18 Bridge Replacement 130,000 19 (Base Construction Allocation - 20 $100,000) 21 (Land Allocation - $10,000) 22 (Design and Contingencies - $20,000) 23 (4) SR 2001, BRIDGE OVER WHITE OAK, GIBSON <-- 24 TOWNSHIP, BRIDGE REPLACEMENT 540,000 25 (BASE CONSTRUCTION ALLOCATION - 26 $400,000) 27 (LAND ALLOCATION - $20,000) 28 (DESIGN AND CONTINGENCIES - $120,000) 29 (5) SR 2001, BRIDGE OVER LAUREL BRANCH, 30 GIBSON TOWNSHIP, BRIDGE REPLACEMENT 540,000 19990S0504B1019 - 157 -
1 (BASE CONSTRUCTION ALLOCATION - 2 $400,000) 3 (LAND ALLOCATION - $20,000) 4 (DESIGN AND CONTINGENCIES - $120,000) 5 Section 17. Carbon County. 6 (a) Local Bridges 7 (1) Penn Forest Township, T-481, County 8 Bridge No.21 over Panther Creek, Bridge 9 Replacement 290,000 10 (Base Construction Allocation - 11 $180,000) 12 (Land Allocation - $10,000) 13 (Design and Contingencies - $100,000) 14 (2) Mahoning Township, T-390, Bridge over 15 Mahoning Creek, Bridge Replacement 92,000 16 (Base Construction Allocation - 17 $80,000) 18 (Land Allocation - $4,000) 19 (Design and Contingencies - $8,000) 20 (3) Lausanne Township, T-502, Bridge over 21 Schaffers Run, Bridge Replacement 320,000 22 (Base Construction Allocation - 23 $212,000) 24 (Land Allocation - $8,000) 25 (Design and Contingencies - $100,00) 26 (4) Towamensing Township, T-435, Bridge 27 over Wild Creek, Bridge Replacement 357,000 28 (Base Construction Allocation - 29 $220,000) 30 (Land Allocation - $9,000) 19990S0504B1019 - 158 -
1 (Design and Contingencies - $128,000) 2 (5) Bowmanstown Borough, Ore Street Bridge 3 over Fireline Creek, Bridge 4 Replacement 360,000 5 (Base Construction Allocation - 6 $250,000) 7 (Land Allocation - $10,000) 8 (Design and Contingencies - $100,000) 9 (6) Packer Township, T-463, Bridge over 10 Wetzel Creek, Bridge Replacement 360,000 11 (Base Construction Allocation - 12 $250,000) 13 (Land Allocation - $10,000) 14 (Design and Contingencies - $100,000) 15 (7) East Penn Township, T-354, County 16 Bridge No.6 over Lizard Creek, Bridge 17 Replacement 974,000 18 (Base Construction Allocation - 19 $600,000) 20 (Land Allocation - $300,000) 21 (Design and Contingencies - $74,000) 22 (8) LEHIGH TOWNSHIP, LESLIE RUN ROAD OVER <-- 23 LESLIE RUN, BRIDGE REPLACEMENT 110,000 24 (b) State Bridges 25 (1) SR 2002, Delaware Avenue over Palmer 26 Creek, Palmerton Borough, Bridge 27 Replacement 568,000 28 (Base Construction Allocation - 29 $318,000) 30 (Land Allocation - $150,000) 19990S0504B1019 - 159 -
1 (Design and Contingencies - $100,000) 2 (2) SR 4010, SR 4010 over Quakake Creek, 3 Packer Township, Bridge Replacement 412,000 4 (Base Construction Allocation - 5 $202,000) 6 (Land Allocation - $150,000) 7 (Design and Contingencies - $60,000) 8 (3) SR 0209, SR 0209 Turnpike Ramp, 9 Mahoning Interchange, Franklin 10 Township, Bridge Replacement 1,260,000 11 (Base Construction Allocation - 12 $750,000) 13 (Land Allocation - $300,000) 14 (Design and Contingencies - $210,000) 15 (4) SR 0248, SR 0248 over Pohopoco Creek, 16 Parryville Borough Line, Lower 17 Towamensing Township, Bridge 18 Rehabilitation 415,000 19 (Base Construction Allocation - 20 $315,000) 21 (Design and Contingencies - $100,000) 22 (5) SR 4010, SR 4010 over Hartz Creek, 23 Packer Township, Bridge Replacement 615,000 24 (Base Construction Allocation - 25 $370,000) 26 (Land Allocation - $150,000) 27 (Design and Contingencies - $95,000) 28 (6) SR 0534, SR 0534 over Sand Spring Run, 29 2 Miles South of Lehigh Tannery, Kidder 30 Township, Bridge Replacement 340,000 19990S0504B1019 - 160 -
1 (Base Construction Allocation - 2 $160,000) 3 (Land Allocation - $125,000) 4 (Design and Contingencies - $55,000) 5 (7) SR 0209, SR 0209 over Pohopoco Creek, 6 Village of Harrity, Franklin Township, 7 Bridge Rehabilitation 885,000 8 (Base Construction Allocation - 9 $680,000) 10 (Design and Contingencies - $205,000) 11 (8) SR 0534, Pa 534 over I-80, Kidder 12 Township, Bridge Rehabilitation 540,000 13 (Base Construction Allocation - 14 $440,000) 15 (Design and Contingencies - $100,000) 16 (9) SR 0248, Bridge over Aquashicola 17 Creek, Lower Towamensing Township, 18 Bridge Rehabilitation 310,000 19 (Base Construction Allocation - 20 $300,000) 21 (Design and Contingencies - $10,000) 22 (10) SR 0534, Bridge over Hickory Run, 23 Kidder Township, Bridge Rehabilitation 830,000 24 (Base Construction Allocation - 25 $700,000) 26 (Land Allocation - $30,000) 27 (Design and Contingencies - $100,000) 28 (11) SR 0903, Bridge over Lehigh River, 29 Jim Thorpe Borough, Bridge 30 Rehabilitation 1,250,000 19990S0504B1019 - 161 -
1 (Base Construction Allocation - 2 $1,000,000) 3 (Land Allocation - $50,000) 4 (Design and Contingencies - $200,000) 5 (12) SR 0940, Bridge over Black Creek, 6 Kidder Township, Bridge Replacement 185,000 7 (Base Construction Allocation - 8 $150,000) 9 (Design and Contingencies - $35,000) 10 (13) SR 2006, Bridge over Buckwha Creek, 11 Lower Towamensing Township, Bridge 12 Replacement 1,240,000 13 (Base Construction Allocation - 14 $700,000) 15 (Land Allocation - $90,000) 16 (Design and Contingencies - $450,000) 17 (14) SR 2008, Bridge over Pohopoco Creek, 18 Parryville Borough, Bridge Replacement 920,000 19 (Base Construction Allocation - 20 $600,000) 21 (Land Allocation - $90,000) 22 (Design and Contingencies - $230,000) 23 (15) SR 3005, Bridge over Mahoning Creek, 24 Mahoning Township, Bridge Replacement 308,000 25 (Base Construction Allocation - 26 $280,000) 27 (Design and Contingencies - $28,000) 28 (16) SR 4014, Bridge over Tributary of 29 Indian Run, Lehigh Township, Bridge 30 Replacement 153,000 19990S0504B1019 - 162 -
1 (Base Construction Allocation - 2 $130,000) 3 (Land Allocation - $10,000) 4 (Design and Contingencies - $13,000) 5 (17) SR 4014, Bridge over Tributary of 6 Indian Run, Lehigh Township, Bridge 7 Replacement 88,000 8 (Base Construction Allocation - 9 $80,000) 10 (Design and Contingencies - $8,000) 11 (18) SR 2002, Bridge over Chestnut Ridge 12 Railroad, Palmerton Borough, Bridge 13 Deck Rehabilitation 500,000 14 (Base Construction Allocation - 15 $500,000) 16 Section 18. Centre County. 17 (a) Local Bridges 18 (1) Greene Township, T-350, Stover Road 19 Bridge, Bridge Replacement 230,000 20 (Base Construction Allocation - 21 $180,000) 22 (Land Allocation - $10,000) 23 (Design and Contingencies - $40,000) 24 (2) Howard Township, T-398 over Bullit 25 Run, Bridge Rehabilitation 11,000 26 (Base Construction Allocation - $9,000) 27 (Design and Contingencies - $2,000) 28 (3) Halfmoon Township, T-307 over 29 Loveville Creek, Bridge Replacement 21,000 30 (Base Construction Allocation - 19990S0504B1019 - 163 -
1 $19,000) 2 (Design and Contingencies - $2,000) 3 (4) Penn Township, T-839 over Pine Creek, 4 Bridge Rehabilitation 80,000 5 (Base Construction Allocation - 6 $60,000) 7 (Design and Contingencies - $20,000) 8 (5) Port Matilda Borough, Pedestrian 9 Bridge over Bald Eagle Creek, Bridge 10 Rehabilitation 200,000 11 (Base Construction Allocation - 12 $175,000) 13 (Design and Contingencies - $25,000) 14 (6) Spring Township, T-367, Hill Road 15 Bridge, Bridge Replacement 200,000 16 (Base Construction Allocation - 17 $150,000) 18 (Land Allocation - $10,000) 19 (Design and Contingencies - $40,000) 20 (7) Taylor Township, T-308, McMonagle Road 21 over Sparrow Run, Bridge Replacement 330,000 22 (Base Construction Allocation - 23 $275,000) 24 (Land Allocation - $5,000) 25 (Design and Contingencies - $50,000) 26 (8) Rush Township, Six Mile Road Bridge 27 over Six Mile Run, Bridge Replacement 155,000 28 (Base Construction Allocation - 29 $137,000) 30 (Land Allocation - $5,000) 19990S0504B1019 - 164 -
1 (Design and Contingencies - $13,000) 2 (9) Taylor Township, T-300, Big Fill Run 3 Bridge over Big Fill Run, Bridge 4 Replacement 310,000 5 (Base Construction Allocation - 6 $200,000) 7 (Land Allocation - $10,000) 8 (Design and Contingencies - $100,000) 9 (10) Taylor Township, T-305, Bald Eagle 10 Creek Bridge over Bald Eagle Creek, 11 Bridge Replacement 360,000 12 (Base Construction Allocation - 13 $250,000) 14 (Land Allocation - $10,000) 15 (Design and Contingencies - $100,000) 16 (b) State Bridges 17 (1) SR 0080, I-80 Viaduct over Moshannon 18 Creek and Conrail, Rush Township, 19 Bridge Rehabilitation 14,510,000 20 (Base Construction Allocation - 21 $13,210,000) 22 (Design and Contingencies - $1,300,000) 23 (2) SR 1002, Marsh Creek Bridge over Marsh 24 Creek, Boggs Township, Bridge 25 Replacement 760,000 26 (Base Construction Allocation - 27 $630,000) 28 (Land Allocation - $20,000) 29 (Design and Contingencies - $110,000) 30 (3) SR 1002, Little Marsh Creek Bridge 19990S0504B1019 - 165 -
1 over Little Marsh Creek, Curtin 2 Township, Bridge Replacement 700,000 3 (Base Construction Allocation - 4 $600,000) 5 (Land Allocation - $20,000) 6 (Design and Contingencies - $80,000) 7 (4) SR 2012, Penns Creek Bridge Northwest 8 of the Village of Spring Mills, Gregg 9 Township, Bridge Replacement 470,000 10 (Base Construction Allocation - 11 $360,000) 12 (Land Allocation - $20,000) 13 (Design and Contingencies - $90,000) 14 (5) SR 0220, SR 0220 over Laurel Run, Port 15 Matilda Borough, Bridge Rehabilitation 450,000 16 (Base Construction Allocation - 17 $400,000) 18 (Design and Contingencies - $50,000) 19 (6) SR 0053, Moshannon Creek Bridge over 20 Moshannon Creek, Philipsburg Borough, 21 Bridge Replacement 2,250,000 22 (Base Construction Allocation - 23 $2,000,000) 24 (Land Allocation - $50,000) 25 (Design and Contingencies - $200,000) 26 (7) SR 0144, Bald Eagle Creek Bridge over 27 Bald Eagle Creek, Boggs Township, 28 Bridge Replacement 1,210,000 29 (Base Construction Allocation - 30 $950,000) 19990S0504B1019 - 166 -
1 (Land Allocation - $10,000) 2 (Design and Contingencies - $250,000) 3 (8) SR 0879, Susquehanna Bridge over West 4 Branch of Susquehanna River, Burnside 5 Township, Bridge Replacement 3,700,000 6 (Base Construction Allocation - 7 $3,200,000) 8 (Land Allocation - $100,000) 9 (Design and Contingencies - $400,000) 10 (9) SR 0970, Bridge over Moshannon Creek, 11 Rush Township, Bridge Painting 310,000 12 (Base Construction Allocation - 13 $300,000) 14 (Design and Contingencies - $10,000) 15 (10) SR 1005, Nittany Creek Bridge over 16 Nittany Creek, Marion Township, Bridge 17 Replacement 260,000 18 (Base Construction Allocation - 19 $150,000) 20 (Land Allocation - $10,000) 21 (Design and Contingencies - $100,000) 22 (11) SR 2007, Spruce Creek Bridge over 23 Spruce Creek, Gregg Township, Bridge 24 Replacement 260,000 25 (Base Construction Allocation - 26 $150,000) 27 (Land Allocation - $10,000) 28 (Design and Contingencies - $100,000) 29 (12) SR 2011, Penns Creek Bridge over 30 Penns Creek, Penn Township, Bridge 19990S0504B1019 - 167 -
1 Replacement 1,040,000 2 (Base Construction Allocation - 3 $830,000) 4 (Land Allocation - $10,000) 5 (Design and Contingencies - $200,000) 6 (13) SR 2012, Spring Bridge over Penns 7 Creek, Gregg Township, Bridge 8 Replacement 670,000 9 (Base Construction Allocation - 10 $500,000) 11 (Land Allocation - $20,000) 12 (Design and Contingencies - $150,000) 13 (14) SR 2018, Mill Race Bridge over Mill 14 Race, Penn Township, Bridge Painting 8,000 15 (Base Construction Allocation - $7,000) 16 (Design and Contingencies - $1,000) 17 (15) SR 3027, Trout Run Bridge over Trout 18 Run, Rush Township, Bridge Replacement 270,000 19 (Base Construction Allocation - 20 $160,000) 21 (Land Allocation - $10,000) 22 (Design and Contingencies - $100,000) 23 (16) SR 3034, Cold Stream Run Bridge over 24 Cold Stream Run, Rush Township, Bridge 25 Replacement 746,000 26 (Base Construction Allocation - 27 $576,000) 28 (Land Allocation - $20,000) 29 (Design and Contingencies - $150,000) 30 (17) SR 4004, Wallace Run Bridge over 19990S0504B1019 - 168 -
1 Wallace Run, Boggs Township, Bridge 2 Replacement 455,000 3 (Base Construction Allocation - 4 $345,000) 5 (Land Allocation - $10,000) 6 (Design and Contingencies - $100,000) 7 (18) SR 4005, Bridge over I-80, Snow Shoe 8 Township, Bridge Replacement 2,400,000 9 (Base Construction Allocation - 10 $2,000,000) 11 (Land Allocation - $100,000) 12 (Design and Contingencies - $300,000) 13 (19) SR 4006, Moshannon Creek Bridge over 14 Moshannon Creek, Rush Township, Bridge 15 Replacement 1,000,000 16 (Base Construction Allocation - 17 $780,000) 18 (Land Allocation - $20,000) 19 (Design and Contingencies - $200,000) 20 (20) SR 0504, BLACK MOSHANNON CREEK <-- 21 BRIDGE, MOSHANNON STATE PARK, RUSH 22 TOWNSHIP, BRIDGE REHABILITATION 13,000 23 (BASE CONSTRUCTION ALLOCATION - 24 $11,000) 25 (DESIGN AND CONTINGENCIES - $2,000) 26 (21) SR 0550, BRIDGE OVER HALF MOON CREEK, 27 HALF MOON TOWNSHIP, BRIDGE REPLACEMENT 230,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $200,000) 30 (LAND ALLOCATION - $10,000) 19990S0504B1019 - 169 -
1 (DESIGN AND CONTINGENCIES - $20,000) 2 Section 19. Chester County. 3 (a) Local Bridges 4 (1) Parkesburg Borough, State Street 5 Pedestrian Bridge over Amtrak, Bridge 6 Replacement 1,700,000 7 (Base Construction Allocation - 8 $1,000,000) 9 (Land Allocation - $500,000) 10 (Design and Contingencies - $200,000) 11 (2) East Fallowfield Township, T-362, 12 Timacuia Road under Penn Central 13 Railroad, Bridge Removal 445,000 14 (Base Construction Allocation - 15 $400,000) 16 (Land Allocation - $30,000) 17 (Design and Contingencies - $15,000) 18 (3) East Marlborough Township, T-402, 19 County Bridge No.65, Mill Road Bridge 20 over West Branch of Red Clay Creek, 21 Bridge Replacement 345,000 22 (Base Construction Allocation - 23 $291,000) 24 (Land Allocation - $25,000) 25 (Design and Contingencies - $29,000) 26 (4) Oxford Borough, Broad Street Bridge 27 over SEPTA, Bridge Replacement 1,304,000 28 (Base Construction Allocation - 29 $1,125,000) 30 (Land Allocation - $20,000) 19990S0504B1019 - 170 -
1 (Design and Contingencies - $159,000) 2 (5) Penn Township, County Bridge No.260, 3 Posey Mill Road Bridge over Big Elk 4 Creek, Bridge Replacement 425,000 5 (Base Construction Allocation - 6 $300,000) 7 (Land Allocation - $25,000) 8 (Design and Contingencies - $100,000) 9 (6) Tredyffrin Township, Old Lancaster 10 Pike Bridge over Amtrak, Bridge 11 Rehabilitation 465,000 12 (Base Construction Allocation - 13 $400,000) 14 (Land Allocation - $30,000) 15 (Design and Contingencies - $35,000) 16 (7) Tredyffrin Township, T-807, Evans Road 17 Bridge over Conrail, Bridge 18 Replacement 195,000 19 (Base Construction Allocation - 20 $150,000) 21 (Land Allocation - $30,000) 22 (Design and Contingencies - $15,000) 23 (8) West Caln and West Brandywine 24 Townships, County Bridge No.283, Reid 25 Road Bridge over West Branch of 26 Brandywine Creek, Bridge Replacement 740,000 <-- 27 BRANDYWINE CREEK, BRIDGE REPLACEMENT 790,000 <-- 28 (Base Construction Allocation - 29 $600,000) 30 (Land Allocation - $40,000) 19990S0504B1019 - 171 -
1 (Design and Contingencies - $100,000) <--
2 (DESIGN AND CONTINGENCIES - $150,000) <--
3 (9) West Goshen Township, T-210, Old
4 Eachus Mill Road Bridge over SEPTA,
5 Bridge Replacement 615,000
6 (Base Construction Allocation -
7 $500,000)
8 (Land Allocation - $15,000)
9 (Design and Contingencies - $100,000)
10 (10) West Goshen Township, T-328, Bridge
11 over Penn Central Railroad, Bridge
12 Removal 132,000
13 (Base Construction Allocation -
14 $110,000)
15 (Land Allocation - $5,000)
16 (Design and Contingencies - $17,000)
17 (11) West Marlborough Township, T-368,
18 Creek Road Bridge under Penn Central
19 Railroad, Bridge Removal 580,000
20 (Base Construction Allocation -
21 $500,000)
22 (Land Allocation - $5,000)
23 (Design and Contingencies - $75,000)
24 (12) West Marlborough Township, Bridge
25 over Doe Run, Bridge Replacement 915,000
26 (Base Construction Allocation -
27 $750,000)
28 (Land Allocation - $25,000)
29 (Design and Contingencies - $140,000)
30 (13) East Coventry Township, Zeiber Road
19990S0504B1019 - 172 -
1 over Pigeon Creek, Bridge Replacement 375,000 2 (Base Construction Allocation - 3 $300,000) 4 (Land Allocation - $15,000) 5 (Design and Contingencies - $60,000) 6 (14) South Coventry Township, Young Road 7 over Pigeon Creek, Bridge 8 Rehabilitation 6,000 9 (Base Construction Allocation - $6,000) 10 (15) Franklin Township, T-356, Mount 11 Olivet Road Bridge over Unnamed 12 Tributary of Big Elk Creek, Bridge 13 Rehabilitation 9,000 14 (Base Construction Allocation - $7,000) 15 (Design and Contingencies - $2,000) 16 (16) North Coventry Township, South Keim 17 Street, Bridge No.270 over Small Run, 18 Bridge Replacement 510,000 <-- 19 (Base Construction Allocation - 20 $150,000) 21 (Land Allocation - $10,000) 22 (Design and Contingencies - $350,000) 23 BRIDGE REPLACEMENT 690,000 <-- 24 (BASE CONSTRUCTION ALLOCATION - 25 $500,000) 26 (LAND ALLOCATION - $40,000) 27 (DESIGN AND CONTINGENCIES - $150,000) 28 (17) ATGLEN BOROUGH, OLD NEWPORT PIKE 29 BRIDGE OVER OFFICER'S RUN CREEK, BRIDGE 30 REHABILITATION 1,500,000 19990S0504B1019 - 173 -
1 (18) NEW LONDON TOWNSHIP, T-321, BRIDGE 2 OVER WEST BRANCH OF WHITE CLAY CREEK, 3 BRIDGE REHABILITATION 25,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $20,000) 6 (DESIGN AND CONTINGENCIES - $5,000) 7 (19) WEST CHESTER BOROUGH, NEILD STREET 8 BRIDGE OVER GOOSE CREEK, BRIDGE 9 REPLACEMENT 111,000 10 (BASE CONSTRUCTION ALLOCATION - 11 $103,000) 12 (DESIGN AND CONTINGENCIES - $8,000) 13 (20) WEST CHESTER BOROUGH, LACEY STREET 14 BRIDGE OVER GOOSE CREEK, BRIDGE 15 REHABILITATION 111,000 16 (BASE CONSTRUCTION ALLOCATION - 17 $103,000) 18 (DESIGN AND CONTINGENCIES - $8,000) 19 (21) WEST NOTTINGHAM TOWNSHIP, T-307 AND 20 T-311, BRIDGE OVER RONEY'S RUN AND 21 NORTHEAST, BRIDGE REHABILITATION 135,000 22 (BASE CONSTRUCTION ALLOCATION - 23 $125,000) 24 (DESIGN AND CONTINGENCIES - $10,000) 25 (22) WEST WHITELAND TOWNSHIP, WHITEFORD 26 ROAD AT CLOVER MILL, DRAINAGE 27 IMPROVEMENT, BRIDGE REHABILITATION 125,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $100,000) 30 (LAND ALLOCATION - $10,000) 19990S0504B1019 - 174 -
1 (DESIGN AND CONTINGENCIES - $15,000) 2 (23) WEST NOTTINGHAM TOWNSHIP, TR 307 AND 3 TR 311, BRIDGE OVER RONEY'S RUN AND 4 NORTH EAST CREEK, BRIDGE 5 REHABILITATION 135,000 6 (BASE CONSTRUCTION ALLOCATION - 7 $125,000) 8 (DESIGN AND CONTINGENCIES - $10,000) 9 (24) WEST CHESTER BOROUGH, LACEY STREET 10 BRIDGE OVER GOOSE CREEK, BRIDGE 11 REPLACEMENT 111,000 12 (BASE CONSTRUCTION ALLOCATION - 13 $103,000) 14 (DESIGN AND CONTINGENCIES - $8,000) 15 (25) ATGLEN BOROUGH, OLD NEWPORT PIKE 16 BRIDGE OVER OFFICER'S RUN CREEK, BRIDGE 17 REHABILITATION 1,500,000 18 (BASE CONSTRUCTION ALLOCATION - 19 $1,500,000) 20 (26) PENN TOWNSHIP, A150 AND SR 0796, 21 BRIDGE OVER SEPTA (DELAWARE VALLEY 22 BRANCH), BRIDGE REHABILITATION 385,000 23 (BASE CONSTRUCTION ALLOCATION - 24 $350,000) 25 (DESIGN AND CONTINGENCIES - $35,000) 26 (27) PENN TOWNSHIP, T-356, BRIDGE OVER 27 MIDDLE CREEK, BRIDGE REHABILITATION 165,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $150,000) 30 (DESIGN AND CONTINGENCIES - $15,000) 19990S0504B1019 - 175 -
1 (28) UWCHLAN TOWNSHIP, PA 113, BRIDGE OVER 2 PENNSYLVANIA TURNPIKE, BRIDGE 3 REPLACEMENT 6,500,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $5,500,000) 6 (LAND ALLOCATION - $500,000) 7 (DESIGN AND CONTINGENCIES - $500,000) 8 (29) AVONDALE BOROUGH, PA 41, BRIDGE OVER 9 WHITE CLAY CREEK, BRIDGE 10 REHABILITATION 220,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $200,000) 13 (DESIGN AND CONTINGENCIES - $20,000) 14 (30) ATGLEN BOROUGH, PA 41, BRIDGE OVER 15 VALLEY CREEK, BRIDGE REPLACEMENT 1,000,000 16 (BASE CONSTRUCTION ALLOCATION - 17 $800,000) 18 (LAND ALLOCATION - $100,000) 19 (DESIGN AND CONTINGENCIES - $100,000) 20 (31) EAST NANTMEAL AND WARWICK TOWNSHIPS, 21 JAMES MILL ROAD OVER FRENCH CREEK 525,000 22 (BASE CONSTRUCTION ALLOCATION - 23 $400,000) 24 (LAND ALLOCATION - $25,000) 25 (DESIGN AND CONTINGENCIES - $100,000) 26 (32) ATGLEN TOWNSHIP, OLD NEWPORT PIKE 27 BRIDGE OVER VALLEY CREEK, BRIDGE 28 REPLACEMENT 450,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $400,000) 19990S0504B1019 - 176 -
1 (LAND ALLOCATION - $10,000) 2 (DESIGN AND CONTINGENCIES - $40,000) 3 (33) EAST PIKELAND TOWNSHIP, PICKERING 4 ROAD BRIDGE OVER PICKERING CREEK, 5 BRIDGE REPLACEMENT 795,000 6 (BASE CONSTRUCTION ALLOCATION - 7 $700,000) 8 (LAND ALLOCATION - $20,000) 9 (DESIGN AND CONTINGENCIES - $75,000) 10 (34) EAST AND WEST BRADFORD TOWNSHIPS, 11 HARMONY HILL ROAD BRIDGE OVER EAST 12 BRANCH BRANDYWINE CREEK, BRIDGE 13 REHABILITATION 1,250,000 14 (BASE CONSTRUCTION ALLOCATION - 15 $1,000,000) 16 (LAND ALLOCATION - $75,000) 17 (DESIGN AND CONTINGENCIES - $175,000) 18 (35) HIGHLAND AND LONDONDERRY TOWNSHIPS, 19 T-310 AND T-344, BRIDGE OVER DOE RUN, 20 BRIDGE REPLACEMENT 920,000 21 (BASE CONSTRUCTION ALLOCATION - 22 $700,000) 23 (LAND ALLOCATION - $40,000) 24 (DESIGN AND CONTINGENCIES - $180,000) 25 (36) LOWER OXFORD TOWNSHIP, FAIRVIEW ROAD 26 BRIDGE OVER TWEEDS RUN, BRIDGE 27 REPLACEMENT 920,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $700,000) 30 (LAND ALLOCATION - $60,000) 19990S0504B1019 - 177 -
1 (DESIGN AND CONTINGENCIES - $160,000) 2 (37) AVONDALE BOROUGH, STATE STREET BRIDGE 3 OVER INDIAN RUN, BRIDGE REPLACEMENT 560,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $500,000) 6 (LAND ALLOCATION - $10,000) 7 (DESIGN AND CONTINGENCIES - $50,000) 8 (b) State Bridges 9 (1) SR 1010, Swedesford Road Bridge over 10 US 422, Drummers Lane and Warner Road, 11 Tredyffrin, Chester County, Upper 12 Merion, Montgomery County, Bridge 13 Replacement 6,795,000 14 (Base Construction Allocation - 15 $6,210,000) 16 (Land Allocation - $180,000) 17 (Design and Contingencies - $405,000) 18 (2) SR 1045, Hares Hill Road Bridge over 19 French Creek, East Pikeland Township, 20 Bridge Rehabilitation 1,000,000 21 (Base Construction Allocation - 22 $740,000) 23 (Land Allocation - $60,000) 24 (Design and Contingencies - $200,000) 25 (3) SR 3014, Lees Road Bridge over Black 26 Run, West Nottingham Township, Bridge 27 Replacement 1,125,000 28 (Base Construction Allocation - 29 $850,000) 30 (Land Allocation - $75,000) 19990S0504B1019 - 178 -
1 (Design and Contingencies - $200,000) 2 (4) SR 3030, Street Road Bridge over 3 Octoraro Creek, Upper Oxford Township, 4 Bridge Replacement 1,875,000 5 (Base Construction Allocation - 6 $1,600,000) 7 (Land Allocation - $75,000) 8 (Design and Contingencies - $200,000) 9 (5) SR 0003, Gay Street Bridge over 10 Abandoned Conrail, West Chester 11 Borough, Bridge Removal 180,000 12 (Base Construction Allocation - 13 $150,000) 14 (Land Allocation - $10,000) 15 (Design and Contingencies - $20,000) 16 (6) SR 0842, Shaws Bridges (Two Bridges) 17 over Branch of Brandywine Creek, East 18 Bradford and Pocopson Townships, Bridge 19 Replacement 1,500,000 20 (Base Construction Allocation - 21 $1,288,000) 22 (Land Allocation - $100,000) 23 (Design and Contingencies - $112,000) 24 (7) SR 0842, Bridge Road Bridge over East 25 Branch of Brandywine Creek, East 26 Bradford Township, Bridge Painting 214,000 27 (Base Construction Allocation - 28 $186,000) 29 (Design and Contingencies - $28,000) 30 (8) SR 1049, Rapp's Dam Covered Bridge, 19990S0504B1019 - 179 -
1 East Pikeland Township, Bridge 2 Painting 47,000 3 (Base Construction Allocation - 4 $41,000) 5 (Design and Contingencies - $6,000) 6 (9) SR 2011, Phoenixville Pike Bridge 7 under Abandoned Penn Central Railroad, 8 West Goshen Township, Bridge Removal 125,000 9 (Base Construction Allocation - 10 $100,000) 11 (Land Allocation - $10,000) 12 (Design and Contingencies - $15,000) 13 (10) SR 2018, Green Hill Road Bridge under 14 Abandoned Penn Central Railroad, West 15 Goshen Township, Bridge Removal 125,000 16 (Base Construction Allocation - 17 $100,000) 18 (Land Allocation - $10,000) 19 (Design and Contingencies - $15,000) 20 (11) SR 3045, Springdell Road Bridge under 21 Abandoned Penn Central Railroad, West 22 Marborough Township, Bridge Removal 125,000 23 (Base Construction Allocation - 24 $100,000) 25 (Land Allocation - $10,000) 26 (Design and Contingencies - $15,000) 27 (12) SR 3049, Hilltop View Road Bridge 28 over Buck and Doe Run Creek, Newlin 29 Township, Bridge Replacement 1,450,000 30 (Base Construction Allocation - 19990S0504B1019 - 180 -
1 $1,300,000) 2 (Land Allocation - $50,000) 3 (Design and Contingencies - $100,000) 4 (13) SR 1012, Bridge over Trout Creek, 5 Tredyffrin Township, Bridge 6 Replacement 850,000 7 (Base Construction Allocation - 8 $550,000) 9 (Land Allocation - $50,000) 10 (Design and Contingencies - $250,000) 11 (14) SR 0113, Gay Street Bridge over 12 French Creek, Phoenixville Borough, 13 Bridge Replacement 10,200,000 14 (Base Construction Allocation - 15 $9,000,000) 16 (Land Allocation - $200,000) 17 (Design and Contingencies - $1,000,000) 18 Section 20. Clarion County. 19 (a) Local Bridges 20 (1) Beaver Township, T-400, Canoe Creek 21 Bridge over Canoe Creek, Bridge 22 Replacement 380,000 23 (Base Construction Allocation - 24 $300,000) 25 (Land Allocation - $10,000) 26 (Design and Contingencies - $70,000) 27 (2) Beaver Township, T-422, Deer Creek 28 Bridge over Deer Creek, Bridge 29 Replacement 540,000 30 (Base Construction Allocation - 19990S0504B1019 - 181 -
1 $450,000) 2 (Land Allocation - $30,000) 3 (Design and Contingencies - $60,000) 4 (3) Clarion and Millcreek Townships, T- 5 490, Mill Creek Bridge over Mill Creek, 6 Bridge Replacement 540,000 7 (Base Construction Allocation - 8 $450,000) 9 (Land Allocation - $10,000) 10 (Design and Contingencies - $80,000) 11 (4) Elk Township, T-424, Deer Creek Bridge 12 over Deer Creek, Bridge Replacement 620,000 13 (Base Construction Allocation - 14 $500,000) 15 (Land Allocation - $20,000) 16 (Design and Contingencies - $100,000) 17 (5) Farmington Township, T-562, Walley Run 18 Bridge over Walley Run, Bridge 19 Replacement 375,000 20 (Base Construction Allocation - 21 $300,000) 22 (Land Allocation - $5,000) 23 (Design and Contingencies - $70,000) 24 (6) Knox Township, T-850, Toby Creek 25 Bridge over Toby Creek, Bridge 26 Replacement 480,000 27 (Base Construction Allocation - 28 $400,000) 29 (Land Allocation - $20,000) 30 (Design and Contingencies - $60,000) 19990S0504B1019 - 182 -
1 (7) Knox Township, T-600, Licking Creek 2 Bridge over Licking Creek, Bridge 3 Replacement 445,000 4 (Base Construction Allocation - 5 $350,000) 6 (Land Allocation - $15,000) 7 (Design and Contingencies - $80,000) 8 (8) Madison Township, T-460, Red Bank 9 Creek Bridge over Tributary of Red Bank 10 Creek, Bridge Replacement 390,000 11 (Base Construction Allocation - 12 $300,000) 13 (Land Allocation - $20,000) 14 (Design and Contingencies - $70,000) 15 (9) Porter Township, T-462, Fiddlers Run 16 Bridge over Fiddlers Run, Bridge 17 Replacement 390,000 18 (Base Construction Allocation - 19 $300,000) 20 (Land Allocation - $10,000) 21 (Design and Contingencies - $80,000) 22 (10) Porter Township, T-472, Leatherwood 23 Creek Bridge over Leatherwood Creek, 24 Bridge Replacement 455,000 25 (Base Construction Allocation - 26 $375,000) 27 (Land Allocation - $20,000) 28 (Design and Contingencies - $60,000) 29 (11) Porter Township, T-750, Leisure Run 30 Bridge over Leisure Run, Bridge 19990S0504B1019 - 183 -
1 Replacement 390,000 2 (Base Construction Allocation - 3 $300,000) 4 (Land Allocation - $10,000) 5 (Design and Contingencies - $80,000) 6 (12) Red Bank Township, T-840, Beaver 7 Creek Bridge over Beaver Creek, Bridge 8 Replacement 420,000 9 (Base Construction Allocation - 10 $350,000) 11 (Land Allocation - $15,000) 12 (Design and Contingencies - $55,000) 13 (13) Red Bank Township, T-508, County 14 Bridge No.46, Pine Creek Bridge over 15 Pine Creek, Bridge Replacement 378,000 16 (Base Construction Allocation - 17 $300,000) 18 (Land Allocation - $8,000) 19 (Design and Contingencies - $70,000) 20 (14) Richland Township, T-382, Turkey Run 21 Bridge over Turkey Run, Bridge 22 Replacement 360,000 23 (Base Construction Allocation - 24 $300,000) 25 (Land Allocation - $10,000) 26 (Design and Contingencies - $50,000) 27 (15) Richland Township, T-382, Turkey Run 28 Bridge over Turkey Run, Bridge 29 Replacement 360,000 30 (Base Construction Allocation - 19990S0504B1019 - 184 -
1 $300,000) 2 (Land Allocation - $10,000) 3 (Design and Contingencies - $50,000) 4 (16) Sligo Borough, Madison Street Bridge 5 over Little Licking Creek, Bridge 6 Replacement 445,000 7 (Base Construction Allocation - 8 $350,000) 9 (Land Allocation - $15,000) 10 (Design and Contingencies - $80,000) 11 (17) Beaver Township, T-332, Bridge No.17 12 over Beaver Creek, Bridge Replacement 560,000 13 (Base Construction Allocation - 14 $400,000) 15 (Land Allocation - $10,000) 16 (Design and Contingencies - $150,000) 17 (18) Beaver Township, T-385 over Canoe 18 Creek, Bridge Replacement 490,000 19 (Base Construction Allocation - 20 $320,000) 21 (Land Allocation - $80,000) 22 (Design and Contingencies - $90,000) 23 (19) Highland Township, T-573 over Toby 24 Creek, Bridge Replacement 500,000 25 (Base Construction Allocation - 26 $360,000) 27 (Land Allocation - $40,000) 28 (Design and Contingencies - $100,000) 29 (20) Knox Township, T-850 over Step Creek, 30 Bridge Replacement 240,000 19990S0504B1019 - 185 -
1 (Base Construction Allocation - 2 $180,000) 3 (Land Allocation - $20,000) 4 (Design and Contingencies - $40,000) 5 (21) Perry Township, T-301, Bridge 6 Replacement 200,000 7 (Base Construction Allocation - 8 $130,000) 9 (Land Allocation - $30,000) 10 (Design and Contingencies - $40,000) 11 (22) Millcreek Township, T-564 over Little 12 Mill Creek, Bridge Replacement 480,000 13 (Base Construction Allocation - 14 $400,000) 15 (Land Allocation - $20,000) 16 (Design and Contingencies - $60,000) 17 (23) Paint Township, T-578 over Step 18 Creek, Bridge Replacement 500,000 19 (Base Construction Allocation - 20 $400,000) 21 (Land Allocation - $20,000) 22 (Design and Contingencies - $80,000) 23 (24) Monroe Township, T-486, County Bridge 24 No.22 over Piney Creek, Bridge 25 Replacement 480,000 26 (Base Construction Allocation - 27 $400,000) 28 (Land Allocation - $10,000) 29 (Design and Contingencies - $70,000) 30 (25) Clarion Township, T-532 over Brush 19990S0504B1019 - 186 -
1 Run, Bridge Replacement 245,000 2 (Base Construction Allocation - 3 $200,000) 4 (Land Allocation - $10,000) 5 (Design and Contingencies - $35,000) 6 (26) Clarion Township, T-561 over Jones 7 Run, Bridge Replacement 245,000 8 (Base Construction Allocation - 9 $200,000) 10 (Land Allocation - $10,000) 11 (Design and Contingencies - $35,000) 12 (27) Elk Township, T-582 over Mahles Run, 13 Bridge Replacement 245,000 14 (Base Construction Allocation - 15 $200,000) 16 (Land Allocation - $10,000) 17 (Design and Contingencies - $35,000) 18 (28) Farmington Township, T-609 over Engle 19 Run, Bridge Replacement 245,000 20 (Base Construction Allocation - 21 $200,000) 22 (Land Allocation - $10,000) 23 (Design and Contingencies - $35,000) 24 (29) Paint Township, T-577 over Toby 25 Creek, Bridge Replacement 106,000 26 (Base Construction Allocation - 27 $100,000) 28 (Land Allocation - $1,000) 29 (Design and Contingencies - $5,000) 30 (30) Paint Township, T-576 over Toby 19990S0504B1019 - 187 -
1 Creek, Bridge Replacement 106,000 2 (Base Construction Allocation - 3 $100,000) 4 (Land Allocation - $1,000) 5 (Design and Contingencies - $5,000) 6 (31) Beaver Township, T-405 over Canoe 7 Creek, Bridge Replacement 106,000 8 (Base Construction Allocation - 9 $100,000) 10 (Land Allocation - $1,000) 11 (Design and Contingencies - $5,000) 12 (32) Beaver Township, T-411 over Boyd Run, 13 Bridge Replacement 106,000 14 (Base Construction Allocation - 15 $100,000) 16 (Land Allocation - $1,000) 17 (Design and Contingencies - $5,000) 18 (33) Elk Township, T-424 over Deer Creek, 19 Bridge Replacement 250,000 20 (Base Construction Allocation - 21 $200,000) 22 (Land Allocation - $10,000) 23 (Design and Contingencies - $40,000) 24 (34) Highland Township, T-577, Bridge over 25 Toby Creek, Bridge Replacement 518,000 26 (Base Construction Allocation - 27 $380,000) 28 (Land Allocation - $8,000) 29 (Design and Contingencies - $130,000) 30 (35) Beaver Township, T-423, Bridge over 19990S0504B1019 - 188 -
1 Canoe Creek, Bridge Replacement 510,000 2 (Base Construction Allocation - 3 $400,000) 4 (Land Allocation - $10,000) 5 (Design and Contingencies - $100,000) 6 (36) Elk Township, T-418, Bridge over Deer 7 Creek, Bridge Replacement 380,000 8 (Base Construction Allocation - 9 $300,000) 10 (Land Allocation - $10,000) 11 (Design and Contingencies - $70,000) 12 (37) Paint Township, T-582, Bridge over 13 Little Paint Creek, Bridge Replacement 424,000 14 (Base Construction Allocation - 15 $350,000) 16 (Land Allocation - $9,000) 17 (Design and Contingencies - $65,000) 18 (38) Ashland Township, T-863, Bridge over 19 Little Canoe Creek, Bridge Replacement 330,000 20 (Base Construction Allocation - 21 $200,000) 22 (Land Allocation - $10,000) 23 (Design and Contingencies - $120,000) 24 (39) Beaver Township, T-325, Schettler 25 Road Bridge over Canoe Creek, Bridge 26 Replacement 395,000 27 (Base Construction Allocation - 28 $250,000) 29 (Land Allocation - $15,000) 30 (Design and Contingencies - $130,000) 19990S0504B1019 - 189 -
1 (40) Madison Township, T-442, Bridge No.34 2 over Wildcat Run, Bridge Replacement 425,000 3 (Base Construction Allocation - 4 $275,000) 5 (Land Allocation - $10,000) 6 (Design and Contingencies - $140,000) 7 (41) Madison Township, T-689, Bridge No.33 8 over Wildcat Run, Bridge Replacement 460,000 9 (Base Construction Allocation - 10 $300,000) 11 (Land Allocation - $10,000) 12 (Design and Contingencies - $150,000) 13 (42) Madison Township, T-880, Bridge 14 No.2050 over Turkey Run, Bridge 15 Replacement 330,000 16 (Base Construction Allocation - 17 $200,000) 18 (Land Allocation - $10,000) 19 (Design and Contingencies - $120,000) 20 (43) Limestone Township, T-540, Little 21 Piney Creek Bridge over Little Piney 22 Creek, Bridge Replacement 145,000 23 (Base Construction Allocation - 24 $112,000) 25 (Land Allocation - $8,000) 26 (Design and Contingencies - $25,000) 27 (44) Clarion Township, T-561, Bridge 28 Washout over Jones Run, Bridge 29 Replacement 245,000 30 (Base Construction Allocation - 19990S0504B1019 - 190 -
1 $200,000) 2 (Land Allocation - $10,000) 3 (Design and Contingencies - $35,000) 4 (45) Elk Township, T-424, Deer Creek 5 Bridge over Deer Creek, Bridge 6 Replacement 620,000 7 (Base Construction Allocation - 8 $500,000) 9 (Land Allocation - $20,000) 10 (Design and Contingencies - $100,000) 11 (46) Elk Township, T-424, Culvert over 12 Deer Creek, Bridge Replacement 250,000 13 (Base Construction Allocation - 14 $200,000) 15 (Land Allocation - $10,000) 16 (Design and Contingencies - $40,000) 17 (47) Millcreek Township, T-564, Little 18 Mill Creek Bridge over Little Mill 19 Creek, Bridge Replacement 480,000 20 (Base Construction Allocation - 21 $400,000) 22 (Land Allocation - $20,000) 23 (Design and Contingencies - $60,000) 24 (48) Paint Township, T-578, Step Creek 25 Bridge over Step Creek, Bridge 26 Replacement 360,000 27 (Base Construction Allocation - 28 $300,000) 29 (Land Allocation - $10,000) 30 (Design & Contingencies - $50,000) 19990S0504B1019 - 191 -
1 (49) Paint Township, T-578, Steiner Road 2 Bridge over Step Creek, Bridge 3 Replacement 500,000 4 (Base Construction Allocation - 5 $400,000) 6 (Land Allocation - $20,000) 7 (Design and Contingencies - $80,000) 8 (50) BEAVER TOWNSHIP, T-385, BRIDGE OVER <-- 9 CANOE CREEK, BRIDGE REPLACEMENT 1,100,000 10 (BASE CONSTRUCTION ALLOCATION - 11 $880,000) 12 (LAND ALLOCATION - $20,000) 13 (DESIGN AND CONTINGENCIES - $200,000) 14 (51) BEAVER TOWNSHIP, T-391, BRIDGE OVER 15 BEAVER CREEK, BRIDGE REPLACEMENT 740,000 16 (BASE CONSTRUCTION ALLOCATION - 17 $550,000) 18 (LAND ALLOCATION - $10,000) 19 (DESIGN AND CONTINGENCIES - $180,000) 20 (52) LIMESTONE TOWNSHIP, T-682, BRIDGE 21 OVER PINEY CREEK, BRIDGE REPLACEMENT 490,000 22 (BASE CONSTRUCTION ALLOCATION - 23 $350,000) 24 (LAND ALLOCATION - $10,000) 25 (DESIGN AND CONTINGENCIES - $130,000) 26 (53) LIMESTONE TOWNSHIP, T-439, BRIDGE 27 OVER PINEY CREEK, BRIDGE REPLACEMENT 872,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $632,000) 30 (LAND ALLOCATION - $10,000) 19990S0504B1019 - 192 -
1 (DESIGN AND CONTINGENCIES - $230,000) 2 (54) MONROE TOWNSHIP, T-486, BRIDGE OVER 3 PINE CREEK, BRIDGE REPLACEMENT 740,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $550,000) 6 (LAND ALLOCATION - $10,000) 7 (DESIGN AND CONTINGENCIES - $180,000) 8 (55) RED BANK TOWNSHIP, T-513, BRIDGE OVER 9 PINEY CREEK, BRIDGE REPLACEMENT 378,000 10 (BASE CONSTRUCTION ALLOCATION - 11 $300,000) 12 (LAND ALLOCATION - $8,000) 13 (DESIGN AND CONTINGENCIES - $70,000) 14 (56) RICHLAND TOWNSHIP, T-382, BRIDGE OVER 15 TURKEY RUN, BRIDGE REPLACEMENT 705,000 16 (BASE CONSTRUCTION ALLOCATION - 17 $495,000) 18 (LAND ALLOCATION - $10,000) 19 (DESIGN AND CONTINGENCIES - $200,000) 20 (57) TOBY AND PERRY TOWNSHIPS, T-301, 21 BRIDGE OVER BLACK FIDDLERS RUN, BRIDGE 22 REPLACEMENT 325,000 23 (BASE CONSTRUCTION ALLOCATION - 24 $200,000) 25 (LAND ALLOCATION - $10,000) 26 (DESIGN AND CONTINGENCIES - $115,000) 27 (58) MILL CREEK TOWNSHIP, T-490 OVER MILL 28 CREEK, DRAINAGE IMPROVEMENT 660,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $550,000) 19990S0504B1019 - 193 -
1 (LAND ALLOCATION - $10,000) 2 (DESIGN AND CONTINGENCIES - $100,000) 3 (b) State Bridges 4 (1) SR 0058, Callensburg Bridge over 5 Clarion River, Licking Township, Bridge 6 Painting 365,000 7 (Base Construction Allocation - 8 $350,000) 9 (Design and Contingencies - $15,000) 10 (2) SR 0080, Beaver Creek Eastbound Bridge 11 over Beaver Creek, Beaver Township, 12 Bridge Painting 390,000 13 (Base Construction Allocation - 14 $375,000) 15 (Design and Contingencies - $15,000) 16 (3) SR 0080, Beaver Creek Westbound Bridge 17 over Beaver Creek, Beaver Township, 18 Bridge Painting 390,000 19 (Base Construction Allocation - 20 $375,000) 21 (Design and Contingencies - $15,000) 22 (4) SR 0080, Canoe Creek Eastbound Bridge 23 over Canoe Creek, Beaver Township, 24 Bridge Painting 1,230,000 25 (Base Construction Allocation - 26 $1,200,000) 27 (Design and Contingencies - $30,000) 28 (5) SR 0080, Canoe Creek Westbound Bridge 29 over Canoe Creek, Beaver Township, 30 Bridge Painting 1,290,000 19990S0504B1019 - 194 -
1 (Base Construction Allocation - 2 $1,260,000) 3 (Design and Contingencies - $30,000) 4 (6) SR 0080, TR 558 Bridge over I-80, 5 Clarion Township, Bridge Painting 195,000 6 (Base Construction Allocation - 7 $180,000) 8 (Design and Contingencies - $15,000) 9 (7) SR 0322, Exit 11 Bridge over I-80, 10 Clarion Township, Clarion Bridge 11 Painting 205,000 12 (Base Construction Allocation - 13 $190,000) 14 (Design and Contingencies - $15,000) 15 (8) SR 0536, Mayport Bridge over Redbank 16 Creek, Red Bank Township, Bridge 17 Painting 215,000 18 (Base Construction Allocation - 19 $200,000) 20 (Design and Contingencies - $15,000) 21 (9) SR 1009, Brush Creek Bridge over Brush 22 Creek, Clarion Township, Bridge 23 Painting 70,000 24 (Base Construction Allocation - 25 $55,000) 26 (Design and Contingencies - $15,000) 27 (10) SR 2001, Piney Creek Bridge over 28 Piney Creek, Limestone Township, Bridge 29 Painting 85,000 30 (Base Construction Allocation - 19990S0504B1019 - 195 -
1 $70,000) 2 (Design and Contingencies - $15,000) 3 (11) SR 2001, Little Piney Creek Bridge 4 over Little Piney Creek, Limestone 5 Township, Bridge Painting 70,000 6 (Base Construction Allocation - 7 $55,000) 8 (Design and Contingencies - $15,000) 9 (12) SR 2005, Glade Run Bridge over Glade 10 Run, Limestone Township, Bridge 11 Painting 60,000 12 (Base Construction Allocation - 13 $45,000) 14 (Design and Contingencies - $15,000) 15 (13) SR 2007, Licking Creek Bridge over 16 Licking Creek, Monroe Township, Bridge 17 Painting 75,000 18 (Base Construction Allocation - 19 $60,000) 20 (Design and Contingencies - $15,000) 21 (14) SR 2009, Lawsonham Bridge over 22 Redbank Creek, Madison Township, Bridge 23 Painting 195,000 24 (Base Construction Allocation - 25 $180,000) 26 (Design and Contingencies - $15,000) 27 (15) SR 2009, Wildcat Run Bridge over 28 Wildcat Run, Madison Township, Bridge 29 Painting 85,000 30 (Base Construction Allocation - 19990S0504B1019 - 196 -
1 $70,000) 2 (Design and Contingencies - $15,000) 3 (16) SR 2015, Little Piney Creek Bridge 4 over Little Piney Creek, Limestone 5 Township, Bridge Painting 60,000 6 (Base Construction Allocation - 7 $45,000) 8 (Design and Contingencies - $15,000) 9 (17) SR 3020, Alum Rock Bridge over Turkey 10 Run, Richland Township, Bridge 11 Painting 75,000 12 (Base Construction Allocation - 13 $60,000) 14 (Design and Contingencies - $15,000) 15 (18) SR 4003, Turkey Run Bridge over 16 Turkey Run, Richland Township, Bridge 17 Painting 65,000 18 (Base Construction Allocation - 19 $50,000) 20 (Design and Contingencies - $15,000) 21 (19) SR 4005, Canoe Creek Bridge over 22 Canoe Creek, Beaver Township, Bridge 23 Painting 70,000 24 (Base Construction Allocation - 25 $55,000) 26 (Design and Contingencies - $15,000) 27 (20) SR 0208, Conrail Overpass, Elk 28 Township, Bridge Removal 120,000 29 (Base Construction Allocation - 30 $80,000) 19990S0504B1019 - 197 -
1 (Land Allocation - $10,000) 2 (Design and Contingencies - $30,000) 3 (21) SR 0322, Conrail Overpass, Elk 4 Township, Bridge Removal 250,000 5 (Base Construction Allocation - 6 $200,000) 7 (Land Allocation - $10,000) 8 (Design and Contingencies - $40,000) 9 (22) SR 1011, Lake Erie, Franklin and 10 Clarion Railroad Overpass, Clarion 11 Township, Bridge Removal 12,000 12 (Base Construction Allocation - 13 $10,000) 14 (Design and Contingencies - $2,000) 15 (23) SR 0066, Bridge over Piney Creek, 16 Limestone Township, Bridge Replacement 650,000 17 (Base Construction Allocation - 18 $500,000) 19 (Land Allocation - $20,000) 20 (Design and Contingencies - $130,000) 21 (24) SR 0066, Bridge over Little Piney 22 Creek, Limestone Township, Bridge 23 Replacement 600,000 24 (Base Construction Allocation - 25 $450,000) 26 (Land Allocation - $20,000) 27 (Design and Contingencies - $130,000) 28 (25) SR 0068, Bridge over Brush Run, 29 Monroe Township, Bridge Replacement 650,000 30 (Base Construction Allocation - 19990S0504B1019 - 198 -
1 $500,000) 2 (Land Allocation - $20,000) 3 (Design and Contingencies - $130,000) 4 (26) SR 0208, Bridge over Canoe Creek, 5 Beaver Township, Bridge Replacement 550,000 6 (Base Construction Allocation - 7 $400,000) 8 (Land Allocation - $20,000) 9 (Design and Contingencies - $130,000) 10 (27) SR 2001, Bridge over Little Piney 11 Creek, Limestone Township, Bridge 12 Replacement 490,000 13 (Base Construction Allocation - 14 $350,000) 15 (Land Allocation - $20,000) 16 (Design and Contingencies - $120,000) 17 (28) SR 0208, SR 0208 over Deer Creek, Elk 18 Township, Bridge Replacement 505,000 19 (Base Construction Allocation - 20 $450,000) 21 (Land Allocation - $5,000) 22 (Design and Contingencies - $50,000) 23 (29) SR 2007, SR 2007 over Deer Creek, 24 Beaver Township, Bridge Replacement 455,000 25 (Base Construction Allocation - 26 $400,000) 27 (Land Allocation - $5,000) 28 (Design and Contingencies - $50,000) 29 (30) SR 4005, SR 4005 over Canoe Creek, 30 Beaver Township, Bridge Replacement 405,000 19990S0504B1019 - 199 -
1 (Base Construction Allocation - 2 $350,000) 3 (Land Allocation - $5,000) 4 (Design and Contingencies - $50,000) 5 (31) SR 4008, SR 4008 over Paint Creek, 6 Knox Township, Bridge Replacement 505,000 7 (Base Construction Allocation - 8 $450,000) 9 (Land Allocation - $5,000) 10 (Design and Contingencies - $50,000) 11 (32) SR 0028, Redbank Creek Bridge over 12 Tributary of Redbank Creek, Redbank 13 Township, Bridge Rehabilitation 1,450,000 14 (Base Construction Allocation - 15 $1,000,000) 16 (Land Allocation - $100,000) 17 (Design and Contingencies - $350,000) 18 (33) SR 0028, Pine Creek Bridge over Pine 19 Creek, Redbank Township, Bridge 20 Rehabilitation 1,450,000 21 (Base Construction Allocation - 22 $1,000,000) 23 (Land Allocation - $100,000) 24 (Design and Contingencies - $350,000) 25 (34) SR 0028, Leisure Run Bridge over 26 Leisure Run, Redbank Township, Bridge 27 Replacement 1,450,000 28 (Base Construction Allocation - 29 $1,000,000) 30 (Land Allocation - $100,000) 19990S0504B1019 - 200 -
1 (Design and Contingencies - $350,000) 2 (35) SR 0028, Walker Run Bridge over 3 Walker Run, Redbank Township, Bridge 4 Rehabilitation 1,450,000 5 (Base Construction Allocation - 6 $1,000,000) 7 (Land Allocation - $100,000) 8 (Design and Contingencies - $350,000) 9 (36) SR 0066, Little Piney Bridge over 10 Little Piney Creek, Clarion Township, 11 Bridge Rehabilitation 1,050,000 12 (Base Construction Allocation - 13 $750,000) 14 (Land Allocation - $50,000) 15 (Design and Contingencies - $250,000) 16 (37) SR 0066, Leisure Run Bridge over 17 Leisure Run, Redbank Township, Bridge 18 Rehabilitation 1,050,000 19 (Base Construction Allocation - 20 $750,000) 21 (Land Allocation - $50,000) 22 (Design and Contingencies - $250,000) 23 (38) SR 0068, Trout Run Bridge over Trout 24 Run, Clarion Township, Bridge 25 Rehabilitation 1,050,000 26 (Base Construction Allocation - 27 $750,000) 28 (Land Allocation - $50,000) 29 (Design and Contingencies - $250,000) 30 (39) SR 0068, Craigs Run Bridge over 19990S0504B1019 - 201 -
1 Craigs Run, Monroe Township, Bridge 2 Replacement 1,050,000 3 (Base Construction Allocation - 4 $750,000) 5 (Land Allocation - $50,000) 6 (Design and Contingencies - $250,000) 7 (40) SR 0068, Craigs Run Bridge over 8 Craigs Run, Monroe Township, Bridge 9 Rehabilitation 1,050,000 10 (Base Construction Allocation - 11 $750,000) 12 (Land Allocation - $50,000) 13 (Design and Contingencies - $250,000) 14 (41) SR 0068, Reids Run Bridge over Reids 15 Run, Monroe Township, Bridge 16 Rehabilitation 1,050,000 17 (Base Construction Allocation - 18 $750,000) 19 (Land Allocation - $50,000) 20 (Design and Contingencies - $250,000) 21 (42) SR 0068, Brush Run Bridge over Brush 22 Run, Monroe Township, Bridge 23 Replacement 1,050,000 24 (Base Construction Allocation - 25 $750,000) 26 (Land Allocation - $50,000) 27 (Design and Contingencies - $250,000) 28 (43) SR 0068, Licking Creek Bridge over 29 Licking Creek, Sligo Borough, Bridge 30 Rehabilitation 1,050,000 19990S0504B1019 - 202 -
1 (Base Construction Allocation - 2 $750,000) 3 (Land Allocation - $50,000) 4 (Design and Contingencies - $250,000) 5 (44) SR 0080, I-80 Bridge over Coal Run, 6 Beaver Township, Bridge Rehabilitation 1,450,000 7 (Base Construction Allocation - 8 $1,000,000) 9 (Land Allocation - $100,000) 10 (Design and Contingencies - $350,000) 11 (45) SR 0080, I-80 Bridge over Deer Creek, 12 Beaver Township, Bridge Rehabilitation 1,450,000 13 (Base Construction Allocation - 14 $1,000,000) 15 (Land Allocation - $100,000) 16 (Design and Contingencies - $350,000) 17 (46) SR 0080, I-80 Bridge over Tributary 18 of Clarion River, Beaver Township, 19 Bridge Rehabilitation 1,450,000 20 (Base Construction Allocation - 21 $1,000,000) 22 (Land Allocation - $100,000) 23 (Design and Contingencies - $350,000) 24 (47) SR 0080, I-80 Bridge, Westbound over 25 SR 2014, Clarion Township, Bridge 26 Rehabilitation 1,450,000 27 (Base Construction Allocation - 28 $1,000,000) 29 (Land Allocation - $100,000) 30 (Design and Contingencies - $350,000) 19990S0504B1019 - 203 -
1 (48) SR 0080, I-80 Bridge, Eastbound over 2 SR 2014, Clarion Township, Bridge 3 Rehabilitation 1,450,000 4 (Base Construction Allocation - 5 $1,000,000) 6 (Land Allocation - $100,000) 7 (Design and Contingencies - $350,000) 8 (49) SR 0080, I-80 Bridge over Boyd Run, 9 Paint Township, Bridge Rehabilitation 1,450,000 10 (Base Construction Allocation - 11 $1,000,000) 12 (Land Allocation - $100,000) 13 (Design and Contingencies - $350,000) 14 (50) SR 0080, I-80 Bridge over Branch of 15 Clarion River, Paint Township, Bridge 16 Rehabilitation 1,450,000 17 (Base Construction Allocation - 18 $1,000,000) 19 (Land Allocation - $100,000) 20 (Design and Contingencies - $350,000) 21 (51) SR 0080, I-80 Bridge over Turkey Run, 22 Richland Township, Bridge 23 Rehabilitation 1,450,000 24 (Base Construction Allocation - 25 $1,000,000) 26 (Land Allocation - $100,000) 27 (Design and Contingencies - $350,000) 28 (52) SR 2001, Piney Creek Bridge over 29 Piney Creek, Limestone Township, Bridge 30 Replacement 620,000 19990S0504B1019 - 204 -
1 (Base Construction Allocation - 2 $500,000) 3 (Land Allocation - $20,000) 4 (Design and Contingencies - $100,000) 5 (53) SR 4008, BRIDGE OVER SHELTER RUN, <-- 6 KNOX TOWNSHIP, BRIDGE REPLACEMENT 265,000 7 (BASE CONSTRUCTION ALLOCATION - 8 $180,000) 9 (LAND ALLOCATION - $10,000) 10 (DESIGN AND CONTINGENCIES - $75,000) 11 (54) SR 4005, I-80 EASTBOUND, BRIDGE OVER 12 CANOE CREEK, BEAVER TOWNSHIP, BRIDGE 13 REHABILITATION 210,000 14 (BASE CONSTRUCTION ALLOCATION - 15 $180,000) 16 (DESIGN AND CONTINGENCIES - $30,000) 17 (55) SR 4005, I-80 WESTBOUND, BRIDGE OVER 18 CANOE CREEK, BEAVER TOWNSHIP, BRIDGE 19 REHABILITATION 210,000 20 (BASE CONSTRUCTION ALLOCATION - 21 $180,000) 22 (DESIGN AND CONTINGENCIES - $30,000) 23 (56) SR 2003, BRIDGE OVER BRANCH OF 24 LEATHER RUN, MONROE TOWNSHIP, BRIDGE 25 REHABILITATION 60,000 26 (BASE CONSTRUCTION ALLOCATION - 27 $40,000) 28 (DESIGN AND CONTINGENCIES - $20,000) 29 (57) SR 4027, BRIDGE OVER DEER CREEK, ELK 30 TOWNSHIP, BRIDGE DECK REPLACEMENT 60,000 19990S0504B1019 - 205 -
1 (BASE CONSTRUCTION ALLOCATION - 2 $40,000) 3 (DESIGN AND CONTINGENCIES - $20,000) 4 Section 21. Clearfield County. 5 (a) Local Bridges 6 (1) Knox Township, T-565 Bridge over Potts 7 Run, Bridge Replacement 510,000 8 (Base Construction Allocation - 9 $350,000) 10 (Land Allocation - $10,000) 11 (Design and Contingencies - $150,000) 12 (2) Houtzdale Borough, McAteer Street 13 Bridge, Bridge Replacement 430,000 14 (Base Construction Allocation - 15 $270,000) 16 (Land Allocation - $20,000) 17 (Design and Contingencies - $140,000) 18 (3) Penn Township, T-461 over Bell Run, 19 Bridge Replacement 106,000 20 (Base Construction Allocation - 21 $100,000) 22 (Land Allocation - $1,000) 23 (Design and Contingencies - $5,000) 24 (4) City of Dubois, Washington Avenue 25 Bridge over Pentz Run, Bridge 26 Replacement 63,000 27 (Base Construction Allocation - 28 $45,000) 29 (Land Allocation - $3,000) 30 (Design and Contingencies - $15,000) 19990S0504B1019 - 206 -
1 (5) Sandy Township, T-854, Narrows Creek 2 Bridge over Narrows Creek, Bridge 3 Replacement 320,000 4 (Base Construction Allocation - 5 $240,000) 6 (Land Allocation - $16,000) 7 (Design and Contingencies - $64,000) 8 (6) Brady Township, T-353, Bridge over 9 East Branch of Mahoning Creek, Bridge 10 Replacement 344,000 11 (Base Construction Allocation - 12 $272,000) 13 (Land Allocation - $8,000) 14 (Design and Contingencies - $64,000) 15 (7) Union Township, T-372, Conrail Bridge 16 over Conrail, Bridge Removal 515,000 17 (Base Construction Allocation - 18 $400,000) 19 (Land Allocation - $15,000) 20 (Design and Contingencies - $100,000) 21 (8) SANDY TOWNSHIP, T-584, BRIDGE OVER <-- 22 NARROWS CREEK, BRIDGE REPLACEMENT 620,000 23 (BASE CONSTRUCTION ALLOCATION - 24 $500,000) 25 (LAND ALLOCATION - $20,000) 26 (DESIGN AND CONTINGENCIES - $100,000) 27 (9) BRADFORD TOWNSHIP, T-210, BRIDGE OVER 28 MILLSTONE RUN, BRIDGE REPLACEMENT 390,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $300,000) 19990S0504B1019 - 207 -
1 (LAND ALLOCATION - $10,000) 2 (DESIGN AND CONTINGENCIES - $80,000) 3 (b) State Bridges 4 (1) SR 0879, Bridge over US 322 near 5 Clearfield Mall, Lawrence Township, 6 Bridge Painting 644,000 7 (Base Construction Allocation - 8 $614,000) 9 (Design and Contingencies - $30,000) 10 (2) SR 0729, Bridge over Muddy Run, 11 Beccaria Township, Bridge Painting 35,000 12 (Base Construction Allocation - 13 $30,000) 14 (Design and Contingencies - $5,000) 15 (3) SR 0879, Bridge over Susquehanna 16 River, Lawrence Township, Bridge 17 Painting 183,000 18 (Base Construction Allocation - 19 $163,000) 20 (Design and Contingencies - $20,000) 21 (4) SR 0970, Bridge over Moshannon Creek, 22 Osceola Mills, Bridge Painting 145,000 23 (Base Construction Allocation - 24 $120,000) 25 (Design and Contingencies - $25,000) 26 (5) SR 0970, Bridge over Susquehanna 27 River, Village of Shawville, Bridge 28 Painting 163,000 29 (Base Construction Allocation - 30 $143,000) 19990S0504B1019 - 208 -
1 (Design and Contingencies - $20,000) 2 (6) SR 1009, Bridge over Alder Run, Morris 3 Township, Bridge Painting 18,000 4 (Base Construction Allocation - 5 $15,000) 6 (Design and Contingencies - $3,000) 7 (7) SR 1014, Bridge over Alder Run, Graham 8 Township, Bridge Painting 18,000 9 (Base Construction Allocation - 10 $15,000) 11 (Design and Contingencies - $3,000) 12 (8) SR 2010, Bridge over Beaver Run, 13 Woodward Township, Bridge Painting 18,000 14 (Base Construction Allocation - 15 $15,000) 16 (Design and Contingencies - $3,000) 17 (9) SR 2024, Bridge over Conrail, Pike 18 Township, Bridge Painting 28,000 19 (Base Construction Allocation - 20 $24,000) 21 (Design and Contingencies - $4,000) 22 (10) SR 3001, Bridge over Chest Creek, 23 Mahaffey Borough, Bridge Replacement 1,750,000 24 (Base Construction Allocation - 25 $1,300,000) 26 (Land Allocation - $150,000) 27 (Design and Contingencies - $300,000) 28 (11) SR 3012, Bridge over Matthews Run, 29 Beccaria Township, Bridge Painting 18,000 30 (Base Construction Allocation - 19990S0504B1019 - 209 -
1 $15,000) 2 (Design and Contingencies - $3,000) 3 (12) SR 3012, Bridge over Clearfield 4 Creek, Beccaria Township, Bridge 5 Painting 100,000 6 (Base Construction Allocation - 7 $90,000) 8 (Design and Contingencies - $10,000) 9 (13) SR 0219, SR 0219 over Bear Run, Bell 10 Township, Bridge Replacement 505,000 11 (Base Construction Allocation - 12 $450,000) 13 (Land Allocation - $5,000) 14 (Design and Contingencies - $50,000) 15 (14) SR 2014, Bridge over Coal Run, 16 Decatur Township, Bridge Replacement 692,000 17 (Base Construction Allocation - 18 $512,000) 19 (Land Allocation - $30,000) 20 (Design and Contingencies - $150,000) 21 (15) SR 3012, Bridge over Clearfield 22 Creek, Beccaria Township, Bridge 23 Painting 18,000 24 (Base Construction Allocation - 25 $15,000) 26 (Design and Contingencies - $3,000) 27 (16) SR 0255, Bridge over Tyler Run, 28 Village of Hollywood, Huston Township, 29 Bridge Replacement 500,000 30 (Base Construction Allocation - 19990S0504B1019 - 210 -
1 $400,000) 2 (Land Allocation - $20,000) 3 (Design and Contingencies - $80,000) 4 (17) SR 3009, Bridge over Kuhns Run, Bell 5 Township, Bridge Rehabilitation 105,000 6 (Base Construction Allocation - 7 $80,000) 8 (Land Allocation - $5,000) 9 (Design and Contingencies - $20,000) 10 (18) SR 0219, Clear Run Bridge over Clear 11 Run, City of Dubois, Bridge 12 Replacement 760,000 13 (Base Construction Allocation - 14 $600,000) 15 (Land Allocation - $10,000) 16 (Design and Contingencies - $150,000) 17 (19) SR 0219, Bear Creek Bridge over Bear 18 Creek, McGees Mills Township, Bridge 19 Replacement 825,000 20 (Base Construction Allocation - 21 $700,000) 22 (Land Allocation - $25,000) 23 (Design and Contingencies - $100,000) 24 (20) SR 0322, Bridge over Clearfield Creek 25 Lawrence Township, Bridge 26 Rehabilitation 1,400,000 27 (Base Construction Allocation - 28 $1,200,000) 29 (Land Allocation - $50,000) 30 (Design and Contingencies - $150,000) 19990S0504B1019 - 211 -
1 (21) SR 0879, Corman Railroad Bridge over 2 SR 0879, Widen and Flatten Slope, 3 Curwensville Borough, Bridge Removal 1,050,000 4 (Base Construction Allocation - 5 $800,000) 6 (Land Allocation - $100,000) 7 (Design and Contingencies - $150,000) 8 (22) SR 0879, Bridge over Railroad & 9 Susquehanna River, Lawrence Township, 10 Bridge Painting 260,000 11 (Base Construction Allocation - 12 $250,000) 13 (Design and Contingencies - $10,000) 14 (23) SR 0879, Bridge over US 322, Lawrence 15 Township, Bridge Rehabilitation 160,000 16 (Base Construction Allocation - 17 $150,000) 18 (Design and Contingencies - $10,000) 19 (24) SR 0970, Bridge over West Branch of 20 Susquehanna River, Bradford Township 21 and Goshen Township, Bridge Painting 820,000 22 (Base Construction Allocation - 23 $800,000) 24 (Design and Contingencies - $20,000) 25 (25) SR 2024, Rails/Trails Bridge over 26 Rails to Trails, Pike Township, Bridge 27 Painting 135,000 28 (Base Construction Allocation - 29 $130,000) 30 (Design and Contingencies - $5,000) 19990S0504B1019 - 212 -
1 (26) I-80, WESTBOUND SIDE OF BRIDGE AT <-- 2 CLEARFIELD AND JEFFERSON COUNTY LINE, 3 BRIDGE REHABILITATION 1,670,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $1,670,000) 6 (27) SR 0879, ANDERSON CREEK BRIDGE NEAR 7 CURWENSVILLE BOROUGH, BRIDGE 8 REPLACEMENT 1,325,000 9 (BASE CONSTRUCTION ALLOCATION - 10 $1,100,000) 11 (LAND ALLOCATION - $25,000) 12 (DESIGN AND CONTINGENCIES - $200,000) 13 (28) SR 2011, BRIDGE OVER MORGAN RUN, 14 BIGLER TOWNSHIP, BRIDGE REPLACEMENT 520,000 15 (BASE CONSTRUCTION ALLOCATION - 16 $400,000) 17 (LAND ALLOCATION - $20,000) 18 (DESIGN AND CONTINGENCIES - $100,000) 19 (29) SR 3019, BRIDGE OVER CLEARFIELD 20 CREEK, COALPORT BOROUGH, BRIDGE 21 REPLACEMENT 1,350,000 22 (BASE CONSTRUCTION ALLOCATION - 23 $1,100,000) 24 (LAND ALLOCATION - $50,000) 25 (DESIGN AND CONTINGENCIES - $200,000) 26 (30) SR 4027, BRIDGE OVER DEER CREEK, ELK 27 TOWNSHIP, BRIDGE DECK REPLACEMENT 60,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $40,000) 30 (DESIGN AND CONTINGENCIES - $20,000) 19990S0504B1019 - 213 -
1 (31) SR 0053, BRIDGE OVER BIG RUN, OSCEOLA 2 MILLS BOROUGH, BRIDGE REPLACEMENT 350,000 3 (BASE CONSTRUCTION ALLOCATION - 4 $250,000) 5 (LAND ALLOCATION - $20,000) 6 (DESIGN AND CONTINGENCIES - $80,000) 7 (32) SR 0153, BRIDGE OVER CLEARFIELD 8 CREEK, BOGGS AND LAWRENCE TOWNSHIPS, 9 BRIDGE REHABILITATION 650,000 10 (BASE CONSTRUCTION ALLOCATION - 11 $600,000) 12 (LAND ALLOCATION - $10,000) 13 (DESIGN AND CONTINGENCIES - $40,000) 14 (33) SR 1001, BRIDGE OVER MONTGOMERY RUN, 15 LAWRENCE TOWNSHIP, BRIDGE REPLACEMENT 114,000 16 (BASE CONSTRUCTION ALLOCATION - 17 $80,000) 18 (LAND ALLOCATION - $4,000) 19 (DESIGN AND CONTINGENCIES - $30,000) 20 (34) SR 1014, BRIDGE OVER ADLER RUN, 21 GRAHAM TOWNSHIP AT KYLERTOWN, BRIDGE 22 REHABILITATION 84,000 23 (BASE CONSTRUCTION ALLOCATION - 24 $50,000) 25 (LAND ALLOCATION - $4,000) 26 (DESIGN AND CONTINGENCIES - $30,000) 27 (35) SR 2011, BRIDGE OVER MORGAN RUN, 28 BIGLER TOWNSHIP, BRIDGE REPLACEMENT 520,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $400,000) 19990S0504B1019 - 214 -
1 (LAND ALLOCATION - $20,000) 2 (DESIGN AND CONTINGENCIES - $100,000) 3 (36) SR 3012, BRIDGE OVER CLEARFIELD 4 CREEK, COALPORT BOROUGH, BRIDGE 5 REPLACEMENT 248,000 6 (BASE CONSTRUCTION ALLOCATION - 7 $200,000) 8 (LAND ALLOCATION - $8,000) 9 (DESIGN AND CONTINGENCIES - $40,000) 10 (37) SR 2007, BRISBIN BRIDGE, BRIDGE 11 REPLACEMENT 301,000 12 (BASE CONSTRUCTION ALLOCATION - 13 $250,000) 14 (LAND ALLOCATION - $1,000) 15 (DESIGN AND CONTINGENCIES - $50,000) 16 (38) JUNIATA STREET BRIDGE OVER CLEAR RUN, 17 CITY OF DUBOIS, BRIDGE REPLACEMENT 620,000 18 (BASE CONSTRUCTION ALLOCATION - 19 $500,000) 20 (LAND ALLOCATION - $20,000) 21 (DESIGN AND CONTINGENCIES - $100,000) 22 (39) SR 4020, BRIDGE OVER CLEAR RUN, 23 DUBOIS CITY, SANDY TOWNSHIP, BRIDGE 24 REPLACEMENT 360,000 25 (BASE CONSTRUCTION ALLOCATION - 26 $200,000) 27 (LAND ALLOCATION - $10,000) 28 (DESIGN AND CONTINGENCIES - $150,000) 29 Section 22. Clinton County. 30 (a) Local Bridges 19990S0504B1019 - 215 -
1 (1) Mill Hall Borough, Church Street over 2 Fishing Creek, Bridge Rehabilitation 5,000 3 (Base Construction Allocation - $4,000) 4 (Design and Contingencies - $1,000) 5 (2) Lamar Township, T-352 over Duck Run, 6 Bridge Replacement 440,000 7 (Base Construction Allocation - 8 $350,000) 9 (Land Allocation - $10,000) 10 (Design and Contingencies - $80,000) 11 (3) Bald Eagle Township, T-381, Mill Race 12 Bridge over Mill Race, Bridge 13 Replacement 300,000 14 (Base Construction Allocation - 15 $200,000) 16 (Land Allocation - $20,000) 17 (Design and Contingencies - $80,000) 18 (4) Leidy Township, T-545, Hammersley Fork 19 Bridge over Hammersley Fork, Bridge 20 Replacement 510,000 21 (Base Construction Allocation - 22 $400,000) 23 (Land Allocation - $10,000) 24 (Design and Contingencies - $100,000) 25 (b) State Bridges 26 (1) SR 0044, Bridge over SR 0220, 1 Mile 27 Northeast of Avis, Pine Creek Township, 28 Bridge Painting 580,000 29 (Base Construction Allocation - 30 $525,000) 19990S0504B1019 - 216 -
1 (Design and Contingencies - $55,000) 2 (2) SR 0080, Lamar Interchange (Two 3 Bridges) over PA 64 at Exit 25, Porter 4 Township, Bridge Rehabilitation 4,100,000 5 (Base Construction Allocation - 6 $3,400,000) 7 (Design and Contingencies - $700,000) 8 (3) SR 0144, Bridge over Kettle Creek, 1 9 Mile East of Hammersley Fork, Leidy 10 Township, Bridge Painting 660,000 11 (Base Construction Allocation - 12 $600,000) 13 (Design and Contingencies - $60,000) 14 (4) SR 0044, Pine Creek Bridge over Pine 15 Creek, Grugan Township, Bridge 16 Replacement 2,850,000 17 (Base Construction Allocation - 18 $2,400,000) 19 (Land Allocation - $50,000) 20 (Design and Contingencies - $400,000) 21 (5) SR 0144, Bridge over Kettle Creek, 22 Leidy Township, Bridge Painting 590,000 23 (Base Construction Allocation - 24 $580,000) 25 (Design and Contingencies - $10,000) 26 (6) SR 0144, Hammersley Fork Bridge over 27 Hammersley Fork, Leidy Township, Bridge 28 Painting 130,000 29 (Base Construction Allocation - 30 $125,000) 19990S0504B1019 - 217 -
1 (Design and Contingencies - $5,000) 2 (7) SR 0150, Laurel Run Bridge over Laurel 3 Run, Bald Eagle Township, Bridge 4 Replacement 285,000 5 (Base Construction Allocation - 6 $175,000) 7 (Land Allocation - $10,000) 8 (Design and Contingencies - $100,000) 9 (8) SR 0150, Bald Eagle Creek Bridge over 10 Bald Eagle Creek, Bald Eagle Township, 11 Bridge Replacement 1,370,000 12 (Base Construction Allocation - 13 $1,100,000) 14 (Land Allocation - $20,000) 15 (Design and Contingencies - $250,000) 16 (9) SR 0150, Masden Run Bridge over Masden 17 Run, Beech Creek Township, Bridge 18 Replacement 320,000 19 (Base Construction Allocation - 20 $210,000) 21 (Land Allocation - $10,000) 22 (Design and Contingencies - $100,000) 23 (10) SR 1002, Chatham Run Bridge, Pine 24 Creek Township, Bridge Replacement 475,000 25 (Base Construction Allocation - 26 $345,000) 27 (Land Allocation - $10,000) 28 (Design and Contingencies - $120,000) 29 (11) SR 2004, Big Fishing Creek Bridge 30 over Big Fishing Creek, Porter 19990S0504B1019 - 218 -
1 Township, Bridge Replacement 720,000
2 (Base Construction Allocation -
3 $550,000)
4 (Land Allocation - $20,000)
5 (Design and Contingencies - $150,000)
6 (12) SR 2019, Laurel Run Bridge over
7 Laurel Run, Bald Eagle Township, Bridge
8 Painting 8,000
9 (Base Construction Allocation - $7,000)
10 (Design and Contingencies - $1,000)
11 (13) SR 0120, BRIDGE OVER SHINTOWN RUN, <--
12 NOYES TOWNSHIP, BRIDGE REPLACEMENT 440,000
13 (BASE CONSTRUCTION ALLOCATION -
14 $300,000)
15 (LAND ALLOCATION - $20,000)
16 (DESIGN AND CONTINGENCIES - $120,000)
17 Section 23. Columbia County.
18 (a) Local Bridges (Reserved) <--
19 (A) LOCAL BRIDGES <--
20 (1) CATAWISSA TOWNSHIP, T-422, BRIDGE OVER
21 CATAWISSA CREEK, BRIDGE REPLACEMENT 840,000
22 (BASE CONSTRUCTION ALLOCATION -
23 $615,000)
24 (LAND ALLOCATION - $10,000)
25 (DESIGN AND CONTINGENCIES - $215,000)
26 (2) CLEVELAND TOWNSHIP, T-373, BRIDGE OVER
27 ROARING CREEK, BRIDGE REPLACEMENT 820,000
28 (BASE CONSTRUCTION ALLOCATION -
29 $630,000)
30 (LAND ALLOCATION - $40,000)
19990S0504B1019 - 219 -
1 (DESIGN AND CONTINGENCIES - $150,000) 2 (3) GREENWOOD TOWNSHIP, T-572, BRIDGE OVER 3 MUD RUN, BRIDGE REPLACEMENT 393,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $336,000) 6 (LAND ALLOCATION - $10,000) 7 (DESIGN AND CONTINGENCIES - $47,000) 8 (4) LOCUST TOWNSHIP, T-361, BRIDGE OVER 9 ROARING CREEK, BRIDGE REPLACEMENT 465,000 10 (BASE CONSTRUCTION ALLOCATION - 11 $335,000) 12 (LAND ALLOCATION - $30,000) 13 (DESIGN AND CONTINGENCIES - $100,000) 14 (5) MAIN TOWNSHIP, T-468, BRIDGE OVER 15 CATAWISSA CREEK, BRIDGE REPLACEMENT 1,992,000 16 (BASE CONSTRUCTION ALLOCATION - 17 $1,662,000) 18 (LAND ALLOCATION - $80,000) 19 (DESIGN AND CONTINGENCIES - $250,000) 20 (6) BLOOMSBURG AND MONTOUR TOWNSHIPS, 21 TRAIN STREET, BRIDGE OVER FISHING 22 CREEK, BRIDGE REPLACEMENT 1,330,000 23 (BASE CONSTRUCTION ALLOCATION - 24 $1,100,000) 25 (LAND ALLOCATION - $10,000) 26 (DESIGN AND CONTINGENCIES - $220,000) 27 (7) NORTH CENTRE TOWNSHIP, T-481, BRIDGE 28 OVER WEST BRANCH BRIAR CREEK, BRIDGE 29 REPLACEMENT 410,000 30 (BASE CONSTRUCTION ALLOCATION - 19990S0504B1019 - 220 -
1 $250,000) 2 (LAND ALLOCATION - $30,000) 3 (DESIGN AND CONTINGENCIES - $130,000) 4 (8) NORTH CENTRE TOWNSHIP, T-507, BRIDGE 5 OVER NORTH BRANCH BRIAR CREEK, BRIDGE 6 REPLACEMENT 405,000 7 (BASE CONSTRUCTION ALLOCATION - 8 $265,000) 9 (LAND ALLOCATION - $20,000) 10 (DESIGN AND CONTINGENCIES - $120,000) 11 (9) NORTH CENTRE TOWNSHIP, T-730, BRIDGE 12 OVER WEST BRANCH BRIAR CREEK, BRIDGE 13 REPLACEMENT 405,000 14 (BASE CONSTRUCTION ALLOCATION - 15 $265,000) 16 (LAND ALLOCATION - $20,000) 17 (DESIGN AND CONTINGENCIES - $120,000) 18 (10) ORANGE TOWNSHIP, T-575, BRIDGE OVER 19 MUD RUN, BRIDGE REPLACEMENT 665,000 20 (BASE CONSTRUCTION ALLOCATION - 21 $532,000) 22 (LAND ALLOCATION - $100,000) 23 (DESIGN AND CONTINGENCIES - $33,000) 24 (11) PINE AND GREENWOOD TOWNSHIPS, T-548, 25 BRIDGE OVER LITTLE FISHING CREEK, 26 BRIDGE REPLACEMENT 500,000 27 (BASE CONSTRUCTION ALLOCATION - 28 $390,000) 29 (LAND ALLOCATION - $10,000) 30 (DESIGN AND CONTINGENCIES - $100,000) 19990S0504B1019 - 221 -
1 (12) SCOTT TOWNSHIP, T-514, BRIDGE OVER 2 TRIBUTARY OF FISHING CREEK, BRIDGE 3 REPLACEMENT 480,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $320,000) 6 (LAND ALLOCATION - $30,000) 7 (DESIGN AND CONTINGENCIES - $130,000) 8 (b) State Bridges 9 (1) SR 0044, Chillisquaque Creek Bridge 10 over Chillisquaque Creek, 3 Miles 11 Northwest of Jerseytown, Bridge 12 Replacement 477,000 13 (Base Construction Allocation - 14 $382,000) 15 (Land Allocation - $24,000) 16 (Design and Contingencies - $71,000) 17 (2) SR 0093, Bridge over North Branch of 18 Briar Creek, Bridge Replacement 350,000 19 (Base Construction Allocation - 20 $275,000) 21 (Land Allocation - $15,000) 22 (Design and Contingencies - $60,000) 23 (3) SR 0093, Briar Creek Bridge over Briar 24 Creek, 3 Miles West of Berwick, Bridge 25 Replacement 392,000 26 (Base Construction Allocation - 27 $315,000) 28 (Land Allocation - $18,000) 29 (Design and Contingencies - $59,000) 30 (4) SR 0239, West Creek Bridge over West 19990S0504B1019 - 222 -
1 Creek, Southeast of Benton and 2 Sugarloaf Townships, Bridge 3 Replacement 670,000 4 (Base Construction Allocation - 5 $536,000) 6 (Land Allocation - $34,000) 7 (Design and Contingencies - $100,000) 8 (5) SR 0442, West Branch Run Bridge over 9 West Branch Run, 1.5 Miles North of 10 Iola, Bridge Replacement 206,000 11 (Base Construction Allocation - 12 $165,000) 13 (Land Allocation - $10,000) 14 (Design and Contingencies - $31,000) 15 (6) SR 1004, Erie-Lackawanna Railroad 16 Bridge, Viaduct over Conrail, South 17 Centre Township, Bridge Replacement 1,900,000 18 (Base Construction Allocation - 19 $1,600,000) 20 (Land Allocation - $110,000) 21 (Design and Contingencies - $190,000) 22 (7) SR 1019, Briar Creek Bridge over Briar 23 Creek, Briar Creek Township, Bridge 24 Replacement 404,000 25 (Base Construction Allocation - 26 $323,000) 27 (Land Allocation - $20,000) 28 (Design and Contingencies - $61,000) 29 (8) SR 4012, Little Hemlock Creek Bridge 30 over Little Hemlock Creek, 10 Miles 19990S0504B1019 - 223 -
1 Southeast of Jerseytown, Bridge 2 Replacement 284,000 3 (Base Construction Allocation - 4 $227,000) 5 (Land Allocation - $14,000) 6 (Design and Contingencies - $43,000) 7 (9) SR 4037, Mud Run Bridge over Mud Run, 8 5 Miles Northwest of Millville Borough, 9 Bridge Replacement 307,000 10 (Base Construction Allocation - 11 $246,000) 12 (Land Allocation - $15,000) 13 (Design and Contingencies - $46,000) 14 (10) SR 0011, Bridge over Fishing Creek, 15 Bridge Painting 530,000 16 (Base Construction Allocation - 17 $520,000) 18 (Design and Contingencies - $10,000) 19 (11) SR 1022, Bridge over Fishing Creek, 20 Bridge Painting 380,000 21 (Base Construction Allocation - 22 $370,000) 23 (Design and Contingencies - $10,000) 24 (12) SR 1022, Bridge over Old Channel, 25 Bridge Painting 125,000 26 (Base Construction Allocation - 27 $115,000) 28 (Design and Contingencies - $10,000) 29 (13) SR 4009, Bridge over Fishing Creek, 30 Bridge Painting 315,000 19990S0504B1019 - 224 -
1 (Base Construction Allocation - 2 $305,000) 3 (Design and Contingencies - $10,000) 4 (14) SR 0042, SR 0042 over Roaring Creek, 5 Conyngham Township, Bridge Replacement 457,000 6 (Base Construction Allocation - 7 $366,000) 8 (Land Allocation - $23,000) 9 (Design and Contingencies - $68,000) 10 (15) SR 0239, SR 0239 over West Creek, 11 Benton Township, Bridge Replacement 760,000 12 (Base Construction Allocation - 13 $560,000) 14 (Land Allocation - $35,000) 15 (Design and Contingencies - $165,000) 16 (16) SR 0254, SR 0254 over Little Fishing 17 Creek, Millville Borough, Bridge 18 Replacement 1,020,000 19 (Base Construction Allocation - 20 $816,000) 21 (Land Allocation - $51,000) 22 (Design and Contingencies - $153,000) 23 (17) SR 0339, SR 0339 over Beaver Run, 24 Beaver Township, Bridge Replacement 320,000 25 (Base Construction Allocation - 26 $256,000) 27 (Land Allocation - $16,000) 28 (Design and Contingencies - $48,000) 29 (18) SR 0487, SR 0487 over Stony Brook, 30 Orange Township, Bridge Replacement 380,000 19990S0504B1019 - 225 -
1 (Base Construction Allocation - 2 $304,000) 3 (Land Allocation - $19,000) 4 (Design and Contingencies - $57,000) 5 (19) SR 1014, SR 1014 over Little Briar 6 Creek, Briar Creek Township, Bridge 7 Replacement 415,000 8 (Base Construction Allocation - 9 $332,000) 10 (Land Allocation - $21,000) 11 (Design and Contingencies - $62,000) 12 (20) SR 1023, SR 1023 over East Briar 13 Creek, Briar Creek Township, Bridge 14 Replacement 520,000 15 (Base Construction Allocation - 16 $466,000) 17 (Land Allocation - $29,000) 18 (Design and Contingencies - $25,000) 19 (21) SR 2003, SR 2003 over Tributary of 20 Roaring Creek, Roaring Creek Township, 21 Bridge Replacement 171,000 22 (Base Construction Allocation - 23 $136,000) 24 (Land Allocation - $10,000) 25 (Design and Contingencies - $25,000) 26 (22) SR 2003, SR 2003 over Tributary of 27 Roaring Creek, Locust Township, Bridge 28 Replacement 245,000 29 (Base Construction Allocation - 30 $196,000) 19990S0504B1019 - 226 -
1 (Land Allocation - $12,000) 2 (Design and Contingencies - $37,000) 3 (23) SR 2009, SR 2009 over Catawissa 4 Creek, Main Township, Bridge 5 Replacement 436,000 6 (Base Construction Allocation - 7 $349,000) 8 (Land Allocation - $22,000) 9 (Design and Contingencies - $65,000) 10 (24) SR 4009, SR 4009 over Little Fishing 11 Creek, Mt. Pleasant Township, Bridge 12 Replacement 1,232,000 13 (Base Construction Allocation - 14 $986,000) 15 (Land Allocation - $61,000) 16 (Design and Contingencies - $185,000) 17 (25) SR 4033, SR 4033 over Wolfhouse Run, 18 Pine Township, Bridge Replacement 252,000 19 (Base Construction Allocation - 20 $202,000) 21 (Land Allocation - $12,000) 22 (Design and Contingencies - $38,000) 23 (26) SR 4045, SR 4045 over Green Creek, 24 Greenwood Township, Bridge Replacement 435,000 25 (Base Construction Allocation - 26 $348,000) 27 (Land Allocation - $22,000) 28 (Design and Contingencies - $65,000) 29 (27) SR 4049, SR 4049 over Coles Creek, 30 Sugarloaf Township, Bridge Replacement 1,095,000 19990S0504B1019 - 227 -
1 (Base Construction Allocation - 2 $876,000) 3 (Land Allocation - $55,000) 4 (Design and Contingencies - $164,000) 5 (28) SR 0080, I-80 Bridge over North 6 Branch of Susquehanna River, Mifflin 7 Township, Bridge Replacement 36,550,000 8 (Base Construction Allocation - 9 $34,000,000) 10 (Land Allocation - $50,000) 11 (Design and Contingencies - $2,500,000) 12 (29) SR 8006, SR 8006 Ramp W Bridge, Lime 13 Ridge Interchange, South Centre 14 Township, Bridge Deck Replacement 700,000 15 (Base Construction Allocation - 16 $600,000) 17 (Design and Contingencies - $100,000) 18 Section 24. Crawford County. 19 (a) Local Bridges 20 (1) Fairfield Township, T-636 over Branch 21 of French Creek, Bridge Replacement 108,000 22 (Base Construction Allocation - 23 $100,000) 24 (Land Allocation - $1,000) 25 (Design and Contingencies - $7,000) 26 (2) Fairfield Township, T-321 Bridge No.1 27 over Branch of French Creek, Bridge 28 Replacement 106,000 29 (Base Construction Allocation - 30 $100,000) 19990S0504B1019 - 228 -
1 (Land Allocation - $1,000) 2 (Design and Contingencies - $5,000) 3 (3) Fairfield Township, T-321 Bridge No.2 4 over Branch of French Creek, Bridge 5 Replacement 106,000 6 (Base Construction Allocation - 7 $100,000) 8 (Land Allocation - $1,000) 9 (Design and Contingencies - $5,000) 10 (4) Spring Township, T-747 over Branch of 11 Conneaut Creek, Bridge Replacement 126,000 12 (Base Construction Allocation - 13 $120,000) 14 (Land Allocation - $1,000) 15 (Design and Contingencies - $5,000) 16 (5) Wayne Township, T-347 over Branch of 17 Powdermill Run, Bridge Replacement 106,000 18 (Base Construction Allocation - 19 $100,000) 20 (Land Allocation - $1,000) 21 (Design and Contingencies - $5,000) 22 (6) Wayne Township, T-457 over Tributary 23 of Lake Creek, Bridge Replacement 106,000 24 (Base Construction Allocation - 25 $100,000) 26 (Land Allocation - $1,000) 27 (Design and Contingencies - $5,000) 28 (7) Vernon Township, T-487, Sportsman's 29 Road Bridge over Watson Run, Bridge 30 Replacement 460,000 19990S0504B1019 - 229 -
1 (Base Construction Allocation - 2 $400,000) 3 (Land Allocation - $10,000) 4 (Design and Contingencies - $50,000) 5 (8) Woodcock Township, T-653, Morris Road 6 Bridge over Conrail, Bridge 7 Replacement 360,000 8 (9) City of Titusville, Walnut Street 9 Bridge over Church Run, Bridge 10 Replacement 360,000 11 (10) Rockdale Township, T-878, Swamp 12 Bridge, Bridge Replacement 360,000 13 (11) Vernon Township, T-487, Middle Road 14 Bridge over Watson Run, Bridge 15 Replacement 400,000 16 (Base Construction Allocation - 17 $360,000) 18 (Design and Contingencies - $40,000) 19 (b) State Bridges 20 (1) SR 0006, SR 0006 over Padan Creek, 21 Conneaut Township, Bridge Replacement 1,004,000 22 (Base Construction Allocation - 23 $784,000) 24 (Land Allocation - $20,000) 25 (Design and Contingencies - $200,000) 26 (2) SR 0006, SR 0006 over French Creek, 27 Woodcock Township, Bridge Replacement 2,325,000 28 (Base Construction Allocation - 29 $1,840,000) 30 (Land Allocation - $20,000) 19990S0504B1019 - 230 -
1 (Design and Contingencies - $465,000) 2 (3) SR 0079, SR 0079 under Maple Drive, 3 Hayfield Township, Bridge Replacement 2,401,000 4 (Base Construction Allocation - 5 $1,901,000) 6 (Land Allocation - $20,000) 7 (Design and Contingencies - $480,000) 8 (4) SR 0089, SR 0089 over Shirley Run, 9 Rome Township, Bridge Replacement 510,000 10 (Base Construction Allocation - 11 $420,000) 12 (Land Allocation - $20,000) 13 (Design and Contingencies - $70,000) 14 (5) SR 0098, SR 0098 over Van Horne Run, 15 Vernon Township, Bridge Replacement 320,000 16 (Base Construction Allocation - 17 $260,000) 18 (Land Allocation - $10,000) 19 (Design and Contingencies - $50,000) 20 (6) SR 0099, SR 0099 over Little 21 Conneauttee Creek, Cambridge Township, 22 Bridge Replacement 950,000 23 (Base Construction Allocation - 24 $700,000) 25 (Land Allocation - $50,000) 26 (Design and Contingencies - $200,000) 27 (7) SR 0099, SR 0099 over Conneaut Creek, 28 Cambridge Township, Bridge Replacement 600,000 29 (Base Construction Allocation - 30 $500,000) 19990S0504B1019 - 231 -
1 (Land Allocation - $30,000) 2 (Design and Contingencies - $70,000) 3 (8) SR 0198, SR 0198 over Carr Run, 4 Woodcock Township, Bridge Replacement 260,000 5 (Base Construction Allocation - 6 $200,000) 7 (Land Allocation - $20,000) 8 (Design and Contingencies - $40,000) 9 (9) SR 0285, SR 0285 over Bennett Run, 10 North Shenango Township, Bridge 11 Replacement 750,000 12 (Base Construction Allocation - 13 $650,000) 14 (Land Allocation - $20,000) 15 (Design and Contingencies - $80,000) 16 (10) SR 1002, SR 1002 over Acker Run, 17 Venango Township, Bridge Replacement 370,000 18 (Base Construction Allocation - 19 $300,000) 20 (Land Allocation - $20,000) 21 (Design and Contingencies - $50,000) 22 (11) SR 1024, SR 1024 over Britton Run, 23 Sparta Township, Bridge Replacement 340,000 24 (Base Construction Allocation - 25 $250,000) 26 (Land Allocation - $20,000) 27 (Design and Contingencies - $70,000) 28 (12) SR 2005, SR 2005 over French Creek, 29 East Fairfield Township, Bridge 30 Replacement 1,300,000 19990S0504B1019 - 232 -
1 (Base Construction Allocation - 2 $1,130,000) 3 (Land Allocation - $20,000) 4 (Design and Contingencies - $150,000) 5 (13) SR 2010, SR 2010 over Little Sugar 6 Creek, Wayne Township, Bridge 7 Replacement 260,000 8 (Base Construction Allocation - 9 $200,000) 10 (Land Allocation - $20,000) 11 (Design and Contingencies - $40,000) 12 (14) SR 3016, SR 3016 over B&LE Railroad, 13 Summit Township, Bridge Replacement 1,150,000 14 (Base Construction Allocation - 15 $1,000,000) 16 (Land Allocation - $30,000) 17 (Design and Contingencies - $120,000) 18 (15) SR 0018, SR 0018 Bridge over 19 Tributary of Conneaut Creek, Summit 20 Township, Bridge Rehabilitation 115,000 21 (Base Construction Allocation - 22 $100,000) 23 (Design and Contingencies - $15,000) 24 (16) SR 0098, SR 0098 Bridge over 25 Tributary of Cussewago Creek, Hayfield 26 Township, Bridge Rehabilitation 110,000 27 (Base Construction Allocation - 28 $100,000) 29 (Design and Contingencies - $10,000) 30 (17) SR 2003, Mercer Pike Bridge over 19990S0504B1019 - 233 -
1 Conneaut Creek Outlet, Union Township, 2 Bridge Replacement 600,000 3 (Base Construction Allocation - 4 $520,000) 5 (Land Allocation - $30,000) 6 (Design and Contingencies - $50,000) 7 (18) SR 0006, Bridge over French Creek, 8 Woodcock Township, Bridge Painting 590,000 9 (Base Construction Allocation - 10 $500,000) 11 (Land Allocation - $10,000) 12 (Design and Contingencies - $80,000) 13 (19) SR 0408, Mohawk Run Bridge over 14 Mohawk Run, Rockdale Township, Bridge 15 Replacement 262,000 16 (Base Construction Allocation - 17 $189,000) 18 (Land Allocation - $20,000) 19 (Design and Contingencies - $53,000) 20 (20) SR 1020, Tryonville Road Bridge over 21 Oil Creek, Steuben Township, Bridge 22 Replacement 960,000 23 (Base Construction Allocation - 24 $840,000) 25 (Land Allocation - $20,000) 26 (Design and Contingencies - $100,000) 27 (21) SR 1035, Brown Hill Road Bridge over 28 Muddy Creek Tributary, Rockdale 29 Township, Bridge Rehabilitation 194,000 30 (Base Construction Allocation - 19990S0504B1019 - 234 -
1 $135,000) 2 (Land Allocation - $20,000) 3 (Design and Contingencies - $39,000) 4 (22) SR 4010, West Road Bridge over 5 Cussewago Creek, Cussewago Township, 6 Bridge Painting 480,000 7 (Base Construction Allocation - 8 $400,000) 9 (Land Allocation - $20,000) 10 (Design and Contingencies - $60,000) 11 (23) SR 0198, BRIDGE OVER DICKSON STREET, <-- 12 RANDOLPH TOWNSHIP, BRIDGE 13 REHABILITATION 300,000 14 (BASE CONSTRUCTION ALLOCATION - 15 $220,000) 16 (LAND ALLOCATION - $20,000) 17 (DESIGN AND CONTINGENCIES - $60,000) 18 (24) SR 1008, BRIDGE OVER BRUSH CREEK, 19 CUSSEWAGO TOWNSHIP, BRIDGE 20 REHABILITATION 340,000 21 (BASE CONSTRUCTION ALLOCATION - 22 $260,000) 23 (LAND ALLOCATION - $20,000) 24 (DESIGN AND CONTINGENCIES - $60,000) 25 (25) SR 1008, BRIDGE OVER BOLES RUN, 26 CUSSEWAGO TOWNSHIP, BRIDGE 27 REHABILITATION 340,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $260,000) 30 (LAND ALLOCATION - $20,000) 19990S0504B1019 - 235 -
1 (DESIGN AND CONTINGENCIES - $60,000) 2 (26) SR 3008, BRIDGE OVER JOHNSON RUN, 3 SOUTH SHENANGO TOWNSHIP, BRIDGE 4 REHABILITATION 440,000 5 (BASE CONSTRUCTION ALLOCATION - 6 $360,000) 7 (LAND ALLOCATION - $20,000) 8 (DESIGN AND CONTINGENCIES - $60,000) 9 (27) SR 0008, BRIDGE OVER FRANKLIN STREET 10 MILL RACE, TITUSVILLE, BRIDGE 11 REPLACEMENT 360,000 12 (BASE CONSTRUCTION ALLOCATION - 13 $300,000) 14 (LAND ALLOCATION - $10,000) 15 (DESIGN AND CONTINGENCIES - $50,000) 16 (28) SR 0027, BRIDGE NO.2 OVER OIL CREEK, 17 OIL CREEK TOWNSHIP, BRIDGE REPLACEMENT 200,000 18 (BASE CONSTRUCTION ALLOCATION - 19 $100,000) 20 (LAND ALLOCATION - $20,000) 21 (DESIGN AND CONTINGENCIES - $80,000) 22 (29) SR 0077, BRIDGE OVER MAIN STREET, 23 SPARTANSBURG BOROUGH, BRIDGE 24 REPLACEMENT 600,000 25 (BASE CONSTRUCTION ALLOCATION - 26 $500,000) 27 (LAND ALLOCATION - $20,000) 28 (DESIGN AND CONTINGENCIES - $80,000) 29 (30) SR 0079, BRIDGE OVER T-528, MERCER 30 PIKE, GREENWOOD TOWNSHIP, BRIDGE 19990S0504B1019 - 236 -
1 REPLACEMENT 1,520,000 2 (BASE CONSTRUCTION ALLOCATION - 3 $1,300,000) 4 (LAND ALLOCATION - $20,000) 5 (DESIGN AND CONTINGENCIES - $200,000) 6 (31) SR 0079, BRIDGE OVER ROCK CREEK, 7 GREENWOOD TOWNSHIP, BRIDGE REPLACEMENT 570,000 8 (BASE CONSTRUCTION ALLOCATION - 9 $500,000) 10 (LAND ALLOCATION - $20,000) 11 (DESIGN AND CONTINGENCIES - $50,000) 12 (32) SR 0079, NORTHBOUND BRIDGE OVER 13 CONNEAUT SWAMP, GREENWOOD TOWNSHIP, 14 BRIDGE REPLACEMENT 4,050,000 15 (BASE CONSTRUCTION ALLOCATION - 16 $3,500,000) 17 (LAND ALLOCATION - $50,000) 18 (DESIGN AND CONTINGENCIES - $500,000) 19 (33) SR 0079, SOUTHBOUND BRIDGE OVER 20 CONNEAUT SWAMP, GREENWOOD TOWNSHIP, 21 BRIDGE REPLACEMENT 4,050,000 22 (BASE CONSTRUCTION ALLOCATION - 23 $3,500,000) 24 (LAND ALLOCATION - $50,000) 25 (DESIGN AND CONTINGENCIES - $500,000) 26 (34) SR 0079, BRIDGE OVER T-391 RUNG ROAD, 27 UNION TOWNSHIP, BRIDGE REPLACEMENT 1,120,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $1,000,000) 30 (LAND ALLOCATION - $20,000) 19990S0504B1019 - 237 -
1 (DESIGN AND CONTINGENCIES - $100,000) 2 (35) SR 0079, BRIDGE OVER T-433 AND 3 CONRAIL, UNION TOWNSHIP, BRIDGE 4 REPLACEMENT 2,120,000 5 (BASE CONSTRUCTION ALLOCATION - 6 $2,000,000) 7 (LAND ALLOCATION - $20,000) 8 (DESIGN AND CONTINGENCIES - $100,000) 9 (36) SR 0079, BRIDGE OVER B&LE RAILROAD 10 AND STREAM, UNION TOWNSHIP, BRIDGE 11 REPLACEMENT 3,220,000 12 (BASE CONSTRUCTION ALLOCATION - 13 $3,100,000) 14 (LAND ALLOCATION - $20,000) 15 (DESIGN AND CONTINGENCIES - $100,000) 16 (37) SR 0079, BRIDGE OVER VAN HORNE RUN, 17 VERNON TOWNSHIP, BRIDGE REPLACEMENT 370,000 18 (BASE CONSTRUCTION ALLOCATION - 19 $300,000) 20 (LAND ALLOCATION - $20,000) 21 (DESIGN AND CONTINGENCIES - $50,000) 22 (38) SR 0079, BRIDGE OVER US 6 AND 322, 23 VERNON TOWNSHIP, BRIDGE REPLACEMENT 3,630,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $3,400,000) 26 (LAND ALLOCATION - $30,000) 27 (DESIGN AND CONTINGENCIES - $200,000) 28 (39) SR 0079, BRIDGE OVER US 6 AND 322, 29 VERNON TOWNSHIP, BRIDGE REPLACEMENT 3,230,000 30 (BASE CONSTRUCTION ALLOCATION - 19990S0504B1019 - 238 -
1 $3,000,000) 2 (LAND ALLOCATION - $30,000) 3 (DESIGN AND CONTINGENCIES - $200,000) 4 (40) SR 0079, BRIDGE OVER VAN HORNE RUN, 5 VERNON TOWNSHIP, BRIDGE REHABILITATION 1,000,000 6 (BASE CONSTRUCTION ALLOCATION - 7 $880,000) 8 (LAND ALLOCATION - $20,000) 9 (DESIGN AND CONTINGENCIES - $100,000) 10 (41) SR 0079, BRIDGE OVER SR 0102, VERNON 11 TOWNSHIP, BRIDGE REPLACEMENT 1,120,000 12 (BASE CONSTRUCTION ALLOCATION - 13 $1,000,000) 14 (LAND ALLOCATION - $20,000) 15 (DESIGN AND CONTINGENCIES - $100,000) 16 (42) SR 0079, BRIDGE OVER SR 4011, 17 CUSSEWAGO TOWNSHIP, BRIDGE REPLACEMENT 920,000 18 (BASE CONSTRUCTION ALLOCATION - 19 $800,000) 20 (LAND ALLOCATION - $20,000) 21 (DESIGN AND CONTINGENCIES - $100,000) 22 (43) SR 0089, BRIDGE OVER HUMMER CREEK, 23 OIL CREEK TOWNSHIP, BRIDGE REPLACEMENT 400,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $300,000) 26 (LAND ALLOCATION - $20,000) 27 (DESIGN AND CONTINGENCIES - $80,000) 28 (44) SR 0173, COCHRANTON TRUSS BRIDGE, 29 FAIRFIELD TOWNSHIP, BRIDGE REPLACEMENT 3,100,000 30 (BASE CONSTRUCTION ALLOCATION - 19990S0504B1019 - 239 -
1 $2,750,000) 2 (LAND ALLOCATION - $50,000) 3 (DESIGN AND CONTINGENCIES - $300,000) 4 (45) SR 0198, BRIDGE OVER WOLF RUN, 5 HAYFIELD TOWNSHIP, BRIDGE REPLACEMENT 400,000 6 (BASE CONSTRUCTION ALLOCATION - 7 $300,000) 8 (LAND ALLOCATION - $20,000) 9 (DESIGN AND CONTINGENCIES - $80,000) 10 (46) SR 0285, BRIDGE OVER SR 0079 11 NORTHBOUND AND SOUTHBOUND, GREENWOOD 12 TOWNSHIP, BRIDGE REPLACEMENT 7,920,000 13 (BASE CONSTRUCTION ALLOCATION - 14 $7,100,000) 15 (LAND ALLOCATION - $20,000) 16 (DESIGN AND CONTINGENCIES - $800,000) 17 (47) SR 0285, BRIDGE OVER TOWN HOUSE RUN, 18 FAIRFIELD TOWNSHIP, BRIDGE REPLACEMENT 300,000 19 (BASE CONSTRUCTION ALLOCATION - 20 $200,000) 21 (LAND ALLOCATION - $20,000) 22 (DESIGN AND CONTINGENCIES - $80,000) 23 (48) SR 1010, BRIDGE OVER WOODCOCK CREEK, 24 RICHMOND TOWNSHIP, BRIDGE REPLACEMENT 700,000 25 (BASE CONSTRUCTION ALLOCATION - 26 $600,000) 27 (LAND ALLOCATION - $20,000) 28 (DESIGN AND CONTINGENCIES - $80,000) 29 (49) SR 1013, BRIDGE OVER MCLAUGHLIN 30 CREEK, OIL CREEK TOWNSHIP, BRIDGE 19990S0504B1019 - 240 -
1 REPLACEMENT 300,000 2 (BASE CONSTRUCTION ALLOCATION - 3 $200,000) 4 (LAND ALLOCATION - $20,000) 5 (DESIGN AND CONTINGENCIES - $80,000) 6 (50) SR 1015, BRIDGE OVER HOTCHKISS RUN, 7 CUSSEWAGO TOWNSHIP, BRIDGE REPLACEMENT 200,000 8 (BASE CONSTRUCTION ALLOCATION - 9 $100,000) 10 (LAND ALLOCATION - $20,000) 11 (DESIGN AND CONTINGENCIES - $80,000) 12 (51) SR 1033, BRIDGE OVER MUDDY CREEK, 13 RICHMOND TOWNSHIP, BRIDGE REPLACEMENT 1,360,000 14 (BASE CONSTRUCTION ALLOCATION - 15 $1,200,000) 16 (LAND ALLOCATION - $20,000) 17 (DESIGN AND CONTINGENCIES - $140,000) 18 (52) SR 1035, MACKEY HILL ROAD, BRIDGE 19 OVER MUD CREEK, ROCKDALE TOWNSHIP, 20 BRIDGE REHABILITATION 500,000 21 (BASE CONSTRUCTION ALLOCATION - 22 $420,000) 23 (LAND ALLOCATION - $20,000) 24 (DESIGN AND CONTINGENCIES - $60,000) 25 (53) SR 1037, BRIDGE OVER LITTLE FEDERAL 26 RUN, ATHENS TOWNSHIP, BRIDGE 27 REPLACEMENT 300,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $200,000) 30 (LAND ALLOCATION - $20,000) 19990S0504B1019 - 241 -
1 (DESIGN AND CONTINGENCIES - $80,000) 2 (54) SR 1037, BRIDGE OVER FEDERAL RUN, 3 BLOOMFIELD TOWNSHIP, BRIDGE 4 REPLACEMENT 200,000 5 (BASE CONSTRUCTION ALLOCATION - 6 $120,000) 7 (LAND ALLOCATION - $20,000) 8 (DESIGN AND CONTINGENCIES - $60,000) 9 (55) SR 1039, BRIDGE OVER MOSEY RUN, 10 BLOOMFIELD TOWNSHIP, BRIDGE 11 REPLACEMENT 500,000 12 (BASE CONSTRUCTION ALLOCATION - 13 $400,000) 14 (LAND ALLOCATION - $20,000) 15 (DESIGN AND CONTINGENCIES - $80,000) 16 (56) SR 2017, BRIDGE OVER SUGAR CREEK, 17 TROY TOWNSHIP, BRIDGE REPLACEMENT 300,000 18 (BASE CONSTRUCTION ALLOCATION - 19 $200,000) 20 (LAND ALLOCATION - $20,000) 21 (DESIGN AND CONTINGENCIES - $80,000) 22 (57) SR 2018, DECKARDS RUN BRIDGE NO.1, 23 WAYNE TOWNSHIP, BRIDGE REPLACEMENT 400,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $300,000) 26 (LAND ALLOCATION - $20,000) 27 (DESIGN AND CONTINGENCIES - $80,000) 28 (58) SR 2018, DECKARDS RUN BRIDGE NO.2, 29 WAYNE TOWNSHIP, BRIDGE REPLACEMENT 300,000 30 (BASE CONSTRUCTION ALLOCATION - 19990S0504B1019 - 242 -
1 $200,000) 2 (LAND ALLOCATION - $20,000) 3 (DESIGN AND CONTINGENCIES - $80,000) 4 (59) SR 2019, BRIDGE OVER SUGAR CREEK EAST 5 BRANCH, TROY TOWNSHIP, BRIDGE 6 REPLACEMENT 120,000 7 (BASE CONSTRUCTION ALLOCATION - 8 $50,000) 9 (LAND ALLOCATION - $20,000) 10 (DESIGN AND CONTINGENCIES - $50,000) 11 (60) SR 2028, BRIDGE OVER CALDWELL CREEK, 12 OIL CREEK TOWNSHIP, BRIDGE REPLACEMENT 1,700,000 13 (BASE CONSTRUCTION ALLOCATION - 14 $1,500,000) 15 (LAND ALLOCATION - $20,000) 16 (DESIGN AND CONTINGENCIES - $180,000) 17 (61) SR 3004, BRIDGE OVER CROOKED CREEK, 18 EAST FALLOWFIELD TOWNSHIP, BRIDGE 19 REPLACEMENT 600,000 20 (BASE CONSTRUCTION ALLOCATION - 21 $500,000) 22 (LAND ALLOCATION - $20,000) 23 (DESIGN AND CONTINGENCIES - $80,000) 24 (62) SR 3005, BRIDGE OVER BENNETT RUN, 25 NORTH SHENANGO TOWNSHIP, BRIDGE 26 REPLACEMENT 700,000 27 (BASE CONSTRUCTION ALLOCATION - 28 $600,000) 29 (LAND ALLOCATION - $20,000) 30 (DESIGN AND CONTINGENCIES - $80,000) 19990S0504B1019 - 243 -
1 (63) SR 3011, BRIDGE OVER PYMATUNING 2 RESERVOIR, PINE TOWNSHIP, BRIDGE 3 REPLACEMENT 500,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $400,000) 6 (LAND ALLOCATION - $20,000) 7 (DESIGN AND CONTINGENCIES - $80,000) 8 (64) SR 4001, BRIDGE OVER PADAN CREEK 9 TRIBUTARY, CONNEAUT TOWNSHIP, BRIDGE 10 REPLACEMENT 300,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $200,000) 13 (LAND ALLOCATION - $20,000) 14 (DESIGN AND CONTINGENCIES - $80,000) 15 (65) SR 4001, BEAVER CENTER ROAD BRIDGE 16 NO.1, BEAVER TOWNSHIP, BRIDGE 17 REPLACEMENT 600,000 18 (BASE CONSTRUCTION ALLOCATION - 19 $520,000) 20 (LAND ALLOCATION - $20,000) 21 (DESIGN AND CONTINGENCIES - $60,000) 22 (66) SR 4003, BRIDGE OVER TRIBUTARY OF 23 CONNEAUT CREEK, CONNEAUTVILLE BOROUGH, 24 BRIDGE REPLACEMENT 600,000 25 (BASE CONSTRUCTION ALLOCATION - 26 $500,000) 27 (LAND ALLOCATION - $20,000) 28 (DESIGN AND CONTINGENCIES - $80,000) 29 (67) SR 4004, CENTER ROAD BRIDGE NO.1, 30 CONNEAUT TOWNSHIP, BRIDGE REPLACEMENT 500,000 19990S0504B1019 - 244 -
1 (BASE CONSTRUCTION ALLOCATION - 2 $400,000) 3 (LAND ALLOCATION - $20,000) 4 (DESIGN AND CONTINGENCIES - $80,000) 5 (68) SR 4004, CENTER ROAD BRIDGE NO.2, 6 CONNEAUT TOWNSHIP, BRIDGE REPLACEMENT 300,000 7 (BASE CONSTRUCTION ALLOCATION - 8 $200,000) 9 (LAND ALLOCATION - $20,000) 10 (DESIGN AND CONTINGENCIES - $80,000) 11 (69) SR 4009, BRIDGE OVER I-79, NORTHBOUND 12 AND SOUTHBOUND, HAYFIELD TOWNSHIP, 13 BRIDGE REPLACEMENT 4,820,000 14 (BASE CONSTRUCTION ALLOCATION - 15 $4,300,000) 16 (LAND ALLOCATION - $20,000) 17 (DESIGN AND CONTINGENCIES - $500,000) 18 (70) SR 4010, BRIDGE OVER EAST BRANCH OF 19 CONNEAUT CREEK, BEAVER TOWNSHIP, BRIDGE 20 REPLACEMENT 200,000 21 (BASE CONSTRUCTION ALLOCATION - 22 $100,000) 23 (LAND ALLOCATION - $20,000) 24 (DESIGN AND CONTINGENCIES - $80,000) 25 (71) SR 4011, BRIDGE OVER TRIBUTARY OF 26 WOLF RUN, HAYFIELD TOWNSHIP, BRIDGE 27 REPLACEMENT 200,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $100,000) 30 (LAND ALLOCATION - $20,000) 19990S0504B1019 - 245 -
1 (DESIGN AND CONTINGENCIES - $80,000) 2 (72) SR 4016, BRIDGE OVER BILL MACK RUN, 3 SUMMERHILL TOWNSHIP, BRIDGE 4 REPLACEMENT 200,000 5 (BASE CONSTRUCTION ALLOCATION - 6 $100,000) 7 (LAND ALLOCATION - $20,000) 8 (DESIGN AND CONTINGENCIES - $80,000) 9 (73) SR 0006, BRIDGE OVER FRENCH CREEK, 10 CAMBRIDGE SPRINGS BOROUGH, BRIDGE 11 REPLACEMENT 1,620,000 12 (BASE CONSTRUCTION ALLOCATION - 13 $1,400,000) 14 (LAND ALLOCATION - $20,000) 15 (DESIGN AND CONTINGENCIES - $200,000) 16 (74) SR 0006, BRIDGE OVER CUSSWAGO STREET, 17 CAMBRIDGE TOWNSHIP, BRIDGE REPLACEMENT 590,000 18 (BASE CONSTRUCTION ALLOCATION - 19 $500,000) 20 (LAND ALLOCATION - $10,000) 21 (DESIGN AND CONTINGENCIES - $80,000) 22 (75) SR 0008, BRIDGE OVER FRANKLIN STREET, 23 TITUSVILLE CITY, BRIDGE REPLACEMENT 2,220,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $2,000,000) 26 (LAND ALLOCATION - $20,000) 27 (DESIGN AND CONTINGENCIES - $200,000) 28 (76) SR 0006, BRIDGE OVER SMOCK STREET, 29 WEST MEAD TOWNSHIP, BRIDGE REPLACEMENT 33,600,000 30 (BASE CONSTRUCTION ALLOCATION - 19990S0504B1019 - 246 -
1 $30,000,000)
2 (LAND ALLOCATION - $100,000)
3 (DESIGN AND CONTINGENCIES - $3,500,000)
4 (77) SR 0006, FRENCH CREEK BRIDGE NO.3,
5 WOODCOCK TOWNSHIP, BRIDGE REPLACEMENT 3,120,000
6 (BASE CONSTRUCTION ALLOCATION -
7 $2,800,000)
8 (LAND ALLOCATION - $20,000)
9 (DESIGN AND CONTINGENCIES - $300,000)
10 (78) SR 0006, FRENCH CREEK BRIDGE NO.2,
11 WOODCOCK TOWNSHIP, BRIDGE
12 REHABILITATION 9,320,000
13 (BASE CONSTRUCTION ALLOCATION -
14 $8,000,000)
15 (LAND ALLOCATION - $20,000)
16 (DESIGN AND CONTINGENCIES - $1,300,000)
17 (79) SR 0006, FRENCH CREEK BRIDGE NO.1,
18 WOODCOCK TOWNSHIP, BRIDGE REPLACEMENT 3,330,000
19 (BASE CONSTRUCTION ALLOCATION -
20 $3,000,000)
21 (LAND ALLOCATION - $20,000)
22 (DESIGN AND CONTINGENCIES - $310,000)
23 Section 25. Cumberland County.
24 (a) Local Bridges (Reserved) <--
25 (A) LOCAL BRIDGES <--
26 (1) CAMP HILL BOROUGH, PEDESTRIAN TUNNEL
27 UNDER BYPASS AT 24TH STREET, BRIDGE
28 REPLACEMENT 500,000
29 (2) CAMP HILL BOROUGH, PEDESTRIAN TUNNEL
30 UNDER BYPASS AT 27TH STREET, BRIDGE
19990S0504B1019 - 247 -
1 REPLACEMENT 500,000 2 (3) CUMBERLAND COUNTY, WOLF BRIDGE OVER 3 CONODOQUINET CREEK, BRIDGE REPLACEMENT 1,920,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $1,500,000) 6 (LAND ALLOCATION - $20,000) 7 (DESIGN AND CONTINGENCIES - $400,000) 8 (4) CUMBERLAND AND YORK COUNTIES, BRIDGE 9 OVER YELLOW BREECHES CREEK, BRIDGE 10 REPLACEMENT 1,470,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $1,100,000) 13 (LAND ALLOCATION - $20,000) 14 (DESIGN AND CONTINGENCIES - $350,000) 15 (5) CUMBERLAND AND YORK COUNTIES, BRIDGE 16 OVER YELLOW BREECHES CREEK, BRIDGE 17 REPLACEMENT 1,310,000 18 (BASE CONSTRUCTION ALLOCATION - 19 $950,000) 20 (LAND ALLOCATION - $40,000) 21 (DESIGN AND CONTINGENCIES - $320,000) 22 (6) DICKINSON TOWNSHIP, T-542, BRIDGE OVER 23 YELLOW BREECHES CREEK, BRIDGE 24 REPLACEMENT 1,366,000 25 (BASE CONSTRUCTION ALLOCATION - 26 $1,088,000) 27 (LAND ALLOCATION - $55,000) 28 (DESIGN AND CONTINGENCIES - $223,000) 29 (7) LOWER FRANKFORD TOWNSHIP, T-459, 30 BRIDGE OVER LOCUST CREEK, BRIDGE 19990S0504B1019 - 248 -
1 REHABILITATION 30,000 2 (BASE CONSTRUCTION ALLOCATION - 3 $25,000) 4 (DESIGN AND CONTINGENCIES - $5,000) 5 (8) LOWER FRANKFORD TOWNSHIP, T-459, 6 BRIDGE OVER TRIBUTARY OF OPOSSUM CREEK, 7 BRIDGE REHABILITATION 10,000 8 (BASE CONSTRUCTION ALLOCATION - 9 $10,000) 10 (9) LOWER FRANKFORD TOWNSHIP, T-459, 11 BRIDGE OVER OPOSSUM CREEK, BRIDGE 12 REHABILITATION 2,000 13 (BASE CONSTRUCTION ALLOCATION - $2,000) 14 (10) LOWER MIFFLIN TOWNSHIP, T-414, BRIDGE 15 OVER DOUBLING GAP CREEK, BRIDGE 16 REPLACEMENT 175,000 17 (BASE CONSTRUCTION ALLOCATION - 18 $95,000) 19 (LAND ALLOCATION - $5,000) 20 (DESIGN AND CONTINGENCIES - $75,000) 21 (11) MECHANICSBURG BOROUGH, MULBERRY 22 STREET BRIDGE OVER TRINDLE SPRING RUN, 23 BRIDGE REPLACEMENT 110,000 24 (12) MECHANICSBURG BOROUGH, T-591, BRIDGE 25 OVER TRINDLE SPRING RUN, BRIDGE 26 REPLACEMENT 80,000 27 (13) MOUNT HOLLY SPRINGS BOROUGH, EAST 28 PINE STREET BRIDGE OVER MOUNTAIN CREEK, 29 BRIDGE REPLACEMENT 5,225,000 30 (BASE CONSTRUCTION ALLOCATION - 19990S0504B1019 - 249 -
1 $5,000,000) 2 (LAND ALLOCATION - $20,000) 3 (DESIGN AND CONTINGENCIES - $205,000) 4 (14) PENN TOWNSHIP, T-343, BRIDGE OVER 5 YELLOW BREECHES CREEK, BRIDGE 6 REPLACEMENT 218,000 7 (BASE CONSTRUCTION ALLOCATION - 8 $200,000) 9 (DESIGN AND CONTINGENCIES - $18,000) 10 (b) State Bridges 11 (1) SR 1001, Cavalry Road Bridge over 12 Turnpike, North Middleton Township, 13 Bridge Replacement 2,650,000 14 (Base Construction Allocation - 15 $2,300,000) 16 (Land Allocation - $50,000) 17 (Design and Contingencies - $300,000) 18 (2) SR 0015, US 15 Bridges from Zimmerman 19 Drive to PA 581, Lower Allen Township 20 and East Pennsboro Township, New Bridge 21 Construction 11,610,000 22 (Base Construction Allocation - 23 $10,422,000) 24 (Land Allocation - $100,000) 25 (Design and Contingencies - $1,088,000) 26 (3) PA 34, BRIDGE OVER CONODOQUINET CREEK, <-- 27 NORTH MIDDLETON TOWNSHIP, BRIDGE 28 REPLACEMENT 2,030,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $1,504,000) 19990S0504B1019 - 250 -
1 (LAND ALLOCATION - $150,000) 2 (DESIGN AND CONTINGENCIES - $376,000) 3 (4) SR 4007, BRIDGE OVER CONODOQUINET 4 CREEK, NORTH NEWTON TOWNSHIP, BRIDGE 5 REPLACEMENT 873,000 6 (BASE CONSTRUCTION ALLOCATION - 7 $646,000) 8 (LAND ALLOCATION - $162,000) 9 (DESIGN AND CONTINGENCIES - $65,000) 10 (5) SR 3007, BRIDGE OVER BIG SPRING RUN, 11 WEST PENNSBORO TOWNSHIP, BRIDGE 12 REPLACEMENT 476,000 13 (BASE CONSTRUCTION ALLOCATION - 14 $353,000) 15 (LAND ALLOCATION - $35,000) 16 (DESIGN AND CONTINGENCIES - $88,000) 17 (6) SR 3008, BRIDGE OVER TAGG RUN, 18 DICKINSON TOWNSHIP, BRIDGE REPLACEMENT 462,000 19 (BASE CONSTRUCTION ALLOCATION - 20 $343,000) 21 (LAND ALLOCATION - $34,000) 22 (DESIGN AND CONTINGENCIES - $85,000) 23 (7) US 11, BRIDGE OVER ALEXANDER SPRING, 24 DICKINSON TOWNSHIP, BRIDGE REPLACEMENT 431,000 25 (BASE CONSTRUCTION ALLOCATION - 26 $319,000) 27 (LAND ALLOCATION - $32,000) 28 (DESIGN AND CONTINGENCIES - $80,000) 29 (8) PA 997, BRIDGE OVER DOUBLING GAP RUN, 30 LOWER MIFFLIN TOWNSHIP, BRIDGE 19990S0504B1019 - 251 -
1 REPLACEMENT 784,000 2 (BASE CONSTRUCTION ALLOCATION - 3 $581,000) 4 (LAND ALLOCATION - $58,000) 5 (DESIGN AND CONTINGENCIES - $145,000) 6 (9) VARIOUS BRIDGES, PREVENTIVE 7 MAINTENANCE 382,000 8 Section 26. Dauphin County. 9 (a) Local Bridges 10 (1) City of Harrisburg, Mulberry Street 11 Ramp to Cameron Street, Bridge 12 Rehabilitation 108,000 13 (Base Construction Allocation - 14 $73,000) 15 (Land Allocation - $10,000) 16 (Design and Contingencies - $ 25,000) 17 (2) City of Harrisburg, Maclay Street 18 Bridge over Railroad, Bridge 19 Rehabilitation 218,000 20 (Base Construction Allocation - 21 $183,000) 22 (Land Allocation - $10,000) 23 (Design and Contingencies - $25,000) 24 (3) Mifflin Township, T-631, Reitz Road 25 Bridge over Little Wiconisco Creek, 26 County Bridge No.24, Bridge 27 Replacement 290,000 28 (Base Construction Allocation - 29 $200,000) 30 (Land Allocation - $10,000) 19990S0504B1019 - 252 -
1 (Design and Contingencies - $80,000) 2 (4) Mifflin Township, T-556, Kessler Road 3 Bridge over Little Wiconisco Creek, 4 Bridge Replacement 235,000 5 (Base Construction Allocation - 6 $150,000) 7 (Land Allocation - $10,000) 8 (Design and Contingencies - $75,000) 9 (5) Washington Township, Bolts Road Bridge 10 over Wiconisco Creek, Bridge 11 Rehabilitation 469,000 12 (Base Construction Allocation - 13 $374,000) 14 (Land Allocation - $10,000) 15 (Design and Contingencies - $85,000) 16 (6) Wayne Township, T-496, Lebo Road 17 Bridge over Powell Creek, Bridge 18 Rehabilitation 263,000 19 (Base Construction Allocation - 20 $168,000) 21 (Land Allocation - $10,000) 22 (Design and Contingencies - $85,000) 23 (7) Conewago Township, T-602 and T-749 24 over Conewago Creek, Bridge 25 Replacement 722,000 26 (Base Construction Allocation - 27 $556,000) 28 (Land Allocation - $10,000) 29 (Design and Contingencies - $156,000) 30 (8) Halifax Township, T-454 over Armstrong 19990S0504B1019 - 253 -
1 Creek, Bridge Replacement 480,000 2 (Base Construction Allocation - 3 $367,000) 4 (Land Allocation - $10,000) 5 (Design and Contingencies - $103,000) 6 (9) Jackson Township, T-544 over Armstrong 7 Creek, Bridge Replacement 379,000 8 (Base Construction Allocation - 9 $288,000) 10 (Land Allocation - $10,000) 11 (Design and Contingencies - $81,000) 12 (10) Jefferson Township, T-534 over Powell 13 Creek, Bridge Replacement 397,000 14 (Base Construction Allocation - 15 $302,000) 16 (Land Allocation - $10,000) 17 (Design and Contingencies - $85,000) 18 (11) Upper Paxton Township, T-460 over 19 Wiconisco Creek, Bridge Replacement 427,000 20 (Base Construction Allocation - 21 $326,000) 22 (Land Allocation - $10,000) 23 (Design and Contingencies - $91,000) 24 (12) Washington Township, T-595 over 25 Wiconisco Creek, Bridge Replacement 669,000 26 (Base Construction Allocation - 27 $515,000) 28 (Land Allocation - $10,000) 29 (Design and Contingencies - $144,000) 30 (13) Washington Township, T-462 over 19990S0504B1019 - 254 -
1 Wiconisco Creek, Bridge Replacement 668,000 2 (Base Construction Allocation - 3 $514,000) 4 (Land Allocation - $10,000) 5 (Design and Contingencies - $144,000) 6 (14) Wayne Township, T-448 over Powell 7 Creek, Bridge Replacement 438,000 8 (Base Construction Allocation - 9 $334,000) 10 (Land Allocation - $10,000) 11 (Design and Contingencies - $94,000) 12 (15) Susquehanna Township, Interstate 13 Drive Bridge over Paxton Creek, Bridge 14 Replacement 1,118,000 15 (Base Construction Allocation - 16 $818,000) 17 (Land Allocation - $100,000) 18 (Design and Contingencies - $200,000) 19 (b) State Bridges 20 (1) SR 0039, Bridge over I-81, West 21 Hanover Township, Bridge 22 Reconstruction 3,400,000 23 (Base Construction Allocation - 24 $3,200,000) 25 (Design and Contingencies - $200,000) 26 (2) SR 0743, Spring Creek Bridge over 27 Spring Creek, Derry Township, Bridge 28 Replacement 1,760,000 29 (Base Construction Allocation - 30 $1,500,000) 19990S0504B1019 - 255 -
1 (Land Allocation - $10,000) 2 (Design and Contingencies - $250,000) 3 (3) SR 0743, Conrail Bridge over Conrail, 4 Derry Township, Bridge Replacement 1,760,000 5 (Base Construction Allocation - 6 $1,500,000) 7 (Land Allocation - $10,000) 8 (Design and Contingencies - $250,000) 9 (4) SR 3015, North Progress Avenue Bridge 10 over Paxton Creek, Susquehanna 11 Township, Bridge Rehabilitation 509,000 12 (Base Construction Allocation - 13 $409,000) 14 (Land Allocation - $20,000) 15 (Design and Contingencies - $80,000) 16 (5) SR 3012, MARKET STREET BRIDGE OVER <-- 17 SUSQUEHANNA RIVER, CITY OF HARRISBURG, 18 LIGHTING IMPROVEMENTS 120,000 19 (BASE CONSTRUCTION ALLOCATION - 20 $100,000) 21 (LAND ALLOCATION - $5,000) 22 (DESIGN AND CONTINGENCIES - $15,000) 23 (6) SR 2019, NYES ROAD BRIDGE OVER 24 TRIBUTARY OF BEAVER CREEK, LOWER PAXTON 25 TOWNSHIP, BRIDGE RESTORATION 800,000 26 (BASE CONSTRUCTION ALLOCATION - 27 $640,000) 28 (LAND ALLOCATION - $10,000) 29 (DESIGN AND CONTINGENCIES - $150,000) 30 (7) SR 2017, BRIDGE OVER MANADA CREEK, 19990S0504B1019 - 256 -
1 EAST HANOVER TOWNSHIP, BRIDGE 2 REPLACEMENT 1,115,000 3 (BASE CONSTRUCTION ALLOCATION - 4 $825,000) 5 (LAND ALLOCATION - $83,000) 6 (DESIGN AND CONTINGENCIES - $207,000) 7 (8) SR 2011, BRIDGE OVER BRANCH OF SPRING 8 RUN, DERRY TOWNSHIP, BRIDGE 9 REPLACEMENT 363,000 10 (BASE CONSTRUCTION ALLOCATION - 11 $269,000) 12 (LAND ALLOCATION - $27,000) 13 (DESIGN AND CONTINGENCIES - $67,000) 14 (9) PA 441, BRIDGE OVER SWATARA CREEK, 15 ROYALTON BOROUGH, BRIDGE 16 REHABILITATION 3,520,000 17 (BASE CONSTRUCTION ALLOCATION - 18 $2,718,000) 19 (LAND ALLOCATION - $150,000) 20 (DESIGN AND CONTINGENCIES - $652,000) 21 (10) SR 3012, BRIDGE OVER SUSQUEHANNA 22 RIVER, CITY OF HARRISBURG, BRIDGE 23 REHABILITATION 600,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $525,000) 26 (DESIGN AND CONTINGENCIES - $75,000) 27 (11) US 422 BRIDGE OVER US 322, DERRY 28 TOWNSHIP, BRIDGE REHABILITATION 3,400,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $2,956,000) 19990S0504B1019 - 257 -
1 (DESIGN AND CONTINGENCIES - $444,000) 2 (12) T-390 OVER US 322, DERRY TOWNSHIP, 3 BRIDGE REHABILITATION 437,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $324,000) 6 (LAND ALLOCATION - $32,000) 7 (DESIGN AND CONTINGENCIES - $81,000) 8 (13) SR 2017, MANADA BOTTOM BRIDGE NO.2 9 OVER MANADA CREEK, EAST HANOVER 10 TOWNSHIP, BRIDGE REPLACEMENT 220,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $150,000) 13 (LAND ALLOCATION - $10,000) 14 (DESIGN AND CONTINGENCIES - $60,000) 15 (14) SR 3034, WALNUT STREET PEDESTRIAN 16 BRIDGE OVER SUSQUEHANNA RIVER, CITY OF 17 HARRISBURG, WEST PORTION, BRIDGE 18 REPLACEMENT 10,205,000 19 (15) SR 4008, LITTLE WICONISCO CREEK 20 BRIDGE OVER LITTLE WICONISCO CREEK, 21 UPPER PAXTON TOWNSHIP, BRIDGE 22 REPLACEMENT 191,000 23 (BASE CONSTRUCTION ALLOCATION - 24 $120,000) 25 (LAND ALLOCATION - $10,000) 26 (DESIGN AND CONTINGENCIES - $61,000) 27 (16) VARIOUS BRIDGES, PREVENTIVE 28 MAINTENANCE 382,000 29 Section 27. Delaware County. 30 (a) Local Bridges 19990S0504B1019 - 258 -
1 (1) City of Chester, West 7th Street, 2 County Bridge No.186 over Chester 3 Creek, Bridge Replacement 1,630,000 4 (Base Construction Allocation - 5 $1,470,000) 6 (Land Allocation - $10,000) 7 (Design and Contingencies - $150,000) 8 (2) Locksley Road Bridge over Chester <-- 9 Creek, Thornbury Township, Bridge 10 Replacement 1,850,000 11 (Base Construction Allocation - 12 $1,565,000) 13 (Land Allocation - $20,000) 14 (Design and Contingencies - $265,000) 15 (2) THORNBURY TOWNSHIP, LOCKSLEY ROAD <-- 16 BRIDGE OVER CHESTER CREEK, BRIDGE 17 REPLACEMENT 1,850,000 18 (BASE CONSTRUCTION ALLOCATION - 19 $1,565,000) 20 (LAND ALLOCATION - $20,000) 21 (DESIGN AND CONTINGENCIES - $265,000) 22 (3) ASTON TOWNSHIP, NEW ROAD OVER CHESTER 23 CREEK, BRIDGE REHABILITATION 1,530,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $1,130,000) 26 (LAND ALLOCATION - $30,000) 27 (DESIGN AND CONTINGENCIES - $370,000) 28 (4) UPPER PROVIDENCE TOWNSHIP, THIRD 29 STREET DAM BRIDGE OVER BROOMALLS RUN, 30 BRIDGE REPLACEMENT 885,000 19990S0504B1019 - 259 -
1 (b) State Bridges 2 (1) SR 0030, Pedestrian Tunnel under SR 3 0030 and Ithan Avenue at Villanova 4 University, Radnor Township, Pedestrian 5 Facilities 7,360,000 6 (Base Construction Allocation - 7 $6,500,000) 8 (Land Allocation - $650,000) 9 (Design and Contingencies - $210,000) 10 (2) SR 1015, Darby-Paoli Road Bridge over 11 Branch of Little Darby Creek, Radnor 12 Township, Bridge Replacement 1,000,000 13 (Base Construction Allocation - 14 $760,000) 15 (Land Allocation - $40,000) 16 (Design and Contingencies - $200,000) 17 (3) SR 0291, 4th Street Bridge over Ridley 18 Creek, Chester Township, Bridge 19 Painting 291,000 20 (Base Construction Allocation - 21 $253,000) 22 (Design and Contingencies - $38,000) 23 (4) SR 0291, Essington Avenue Bridge over 24 Darby Creek, Ridley Township, Bridge 25 Painting 546,000 26 (Base Construction Allocation - 27 $487,000) 28 (Design and Contingencies - $59,000) 29 (5) SR 1019, Conestoga Road Bridge over 30 PennDOT Railroad Right-of-Way, Radnor 19990S0504B1019 - 260 -
1 Township, Bridge Removal 125,000 2 (Base Construction Allocation - 3 $100,000) 4 (Land Allocation - $10,000) 5 (Design and Contingencies - $15,000) 6 (6) SR 3019, Rosevally Road Bridge over 7 SEPTA, Upper Providence Township, 8 Bridge Replacement 875,000 9 (Base Construction Allocation - 10 $700,000) 11 (Land Allocation - $100,000) 12 (Design and Contingencies - $75,000) 13 (7) SR 0095, I-95 Bridge over Chester 14 Creek, City of Chester, Bridge 15 Replacement 5,100,000 16 (Base Construction Allocation - 17 $5,000,000) 18 (Design and Contingencies - $100,000) 19 (8) SR 2037, Hanser Bridge on Crum Creek 20 Road over Crum Creek, Marple Township 21 and Upper Providence Township, Bridge 22 Replacement 663,000 23 Section 28. Elk County. 24 (a) Local Bridges 25 (1) Village of Wilcox, T-631, Bridge over 26 Clarion River, Bridge Replacement 1,100,000 27 (Base Construction Allocation - 28 $850,000) 29 (Land Allocation - $50,000) 30 (Design and Contingencies - $200,000) 19990S0504B1019 - 261 -
1 (2) Jones Township, T-671, Bridge over 2 West Branch of Clarion River, Bridge 3 Replacement 1,100,000 4 (Base Construction Allocation - 5 $850,000) 6 (Land Allocation - $50,000) 7 (Design and Contingencies - $200,000) 8 (b) State Bridges 9 (1) SR 0555, Dixon Run Bridge, Village of 10 Caledonia, Jay Township, Bridge 11 Replacement 90,000 12 (Base Construction Allocation - 13 $60,000) 14 (Land Allocation - $10,000) 15 (Design and Contingencies - $20,000) 16 (2) SR 0949, Conrail Bridge over Conrail, 17 Spring Creek Township, Bridge Painting 340,000 18 (Base Construction Allocation - 19 $330,000) 20 (Design and Contingencies - $10,000) 21 (3) SR 1004, Crooked Creek Bridge over 22 Crooked Creek, Jones Township, Bridge 23 Painting 50,000 24 (Base Construction Allocation - 25 $45,000) 26 (Design and Contingencies - $5,000) 27 (4) SR 3001, Belltown Bridge over Clarion 28 River, Heath Township and Millstone 29 Township, Bridge Painting 420,000 30 (Base Construction Allocation - 19990S0504B1019 - 262 -
1 $415,000) 2 (Design and Contingencies - $5,000) 3 (5) SR 3002, Spring Creek Bridge over 4 Spring Creek, Spring Creek Township, 5 Bridge Painting 160,000 6 (Base Construction Allocation - 7 $155,000) 8 (Design and Contingencies - $5,000) 9 Section 29. Erie County. 10 (a) Local Bridges 11 (1) Girard Township, Beckman Bridge over 12 I-90, Bridge Painting 200,000 13 (Base Construction Allocation - 14 $200,000) 15 (2) Millcreek Township, T-707, Zimmerly 16 Road Bridge over I-79, New 2-Lane 17 Bridge Construction, New Bridge 2,150,000 18 (Base Construction Allocation - 19 $1,900,000) 20 (Land Allocation - $50,000) 21 (Design and Contingencies - $200,000) 22 (3) City of Erie, Norman Way, Bridge over 23 Millcreek, Bridge Rehabilitation 225,000 24 (Base Construction Allocation - 25 $200,000) 26 (Design and Contingencies - $25,000) 27 (4) City of Erie, McBride Viaduct-East 28 Avenue, Bridge over Railroad Lines, 29 Bridge Rehabilitation 1,340,000 30 (Base Construction Allocation - 19990S0504B1019 - 263 -
1 $1,300,000) 2 (Design and Contingencies - $40,000) 3 (5) City of Erie, Kahkwa Bridge over 4 Ravine Drive, Bridge Rehabilitation 60,000 5 (Base Construction Allocation - 6 $50,000) 7 (Design and Contingencies - $10,000) 8 (6) Greenfield Township, T-974, Old Route 9 89 Bridge over West Branch of French 10 Creek Tributary, Bridge Replacement 350,000 11 (Base Construction Allocation - 12 $300,000) 13 (Land Allocation - $10,000) 14 (Design and Contingencies - $40,000) 15 (7) Franklin Township, T-424, Bridge No.1 16 over Falk Run, Bridge Replacement 350,000 17 (Base Construction Allocation - 18 $300,000) 19 (Land Allocation - $10,000) 20 (Design and Contingencies - $40,000) 21 (8) Franklin Township, T-424, Bridge No.2 22 over Falk Run, Bridge Replacement 350,000 23 (Base Construction Allocation - 24 $300,000) 25 (Land Allocation - $10,000) 26 (Design and Contingencies - $40,000) 27 (9) Millcreek Township, T-707, Zimmerly 28 Road Bridge over I-79, Two-Lane Bridge 29 Construction 2,150,000 30 (Base Construction Allocation - 19990S0504B1019 - 264 -
1 $1,900,000) 2 (Land Allocation - $50,000) 3 (Design and Contingencies - $200,000) 4 (10) Waterford Township, T-455, Sedgwick 5 Road Bridge over Tributary of Lake Le 6 Boeuf, Bridge Replacement 350,000 7 (Base Construction Allocation - 8 $300,000) 9 (Land Allocation - $10,000) 10 (Design and Contingencies - $40,000) 11 (11) CITY OF ERIE, PITTSBURGH AVENUE OVER <-- 12 CONRAIL AND NS LINES, NEW BRIDGE 11,000,000 13 (BASE CONSTRUCTION ALLOCATION - 14 $10,000,000) 15 (LAND ALLOCATION - $250,000) 16 (DESIGN AND CONTINGENCIES - $750,000) 17 (12) CITY OF ERIE, GREENGARDEN BOULEVARD 18 OVER CONRAIL AND NS LINES, NEW 19 CONSTRUCTION 11,000,000 20 (BASE CONSTRUCTION ALLOCATION - 21 $10,000,000) 22 (LAND ALLOCATION - $250,000) 23 (DESIGN AND CONTINGENCIES - $750,000) 24 (13) FRANKLIN TOWNSHIP, FALLS ROAD OVER 25 FALK RUN BRIDGE NO.2, BRIDGE 26 REHABILITATION 360,000 27 (BASE CONSTRUCTION ALLOCATION - 28 $300,000) 29 (LAND ALLOCATION - $20,000) 30 (DESIGN AND CONTINGENCIES - $40,000) 19990S0504B1019 - 265 -
1 (14) FRANKLIN TOWNSHIP, FALLS ROAD OVER 2 FALK RUN BRIDGE NO.1, BRIDGE 3 REPLACEMENT 360,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $300,000) 6 (LAND ALLOCATION - $20,000) 7 (DESIGN AND CONTINGENCIES - $40,000) 8 (15) MCKEAN TOWNSHIP, OLIVER ROAD OVER 9 FALK RUN BRIDGE NO.2, BRIDGE 10 REPLACEMENT 150,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $125,000) 13 (LAND ALLOCATION - $5,000) 14 (DESIGN AND CONTINGENCIES - $20,000) 15 (16) WATERFORD TOWNSHIP, SEDGWICK ROAD 16 OVER TRIBUTARY OF LAKE LEBOEUF, BRIDGE 17 REPLACEMENT 370,000 18 (BASE CONSTRUCTION ALLOCATION - 19 $300,000) 20 (LAND ALLOCATION - $20,000) 21 (DESIGN AND CONTINGENCIES - $50,000) 22 (b) State Bridges 23 (1) SR 0005, SR 0005 over Scott Run, 24 Harborcreek Township, Bridge 25 Replacement 140,000 26 (Base Construction Allocation - 27 $100,000) 28 (Land Allocation - $10,000) 29 (Design and Contingencies - $30,000) 30 (2) SR 0006, SR 0006 over French Creek, Le 19990S0504B1019 - 266 -
1 Boeuf Township, Bridge Replacement 700,000 2 (Base Construction Allocation - 3 $600,000) 4 (Land Allocation - $20,000) 5 (Design and Contingencies - $80,000) 6 (3) SR 0019, SR 0019 over LeBoeuf Creek, 7 Waterford Township, Bridge Replacement 950,000 8 (Base Construction Allocation - 9 $840,000) 10 (Land Allocation - $30,000) 11 (Design and Contingencies - $80,000) 12 (4) SR 0020, SR 0020 over I-79, City of 13 Erie, Bridge Replacement 2,000,000 14 (Base Construction Allocation - 15 $1,770,000) 16 (Land Allocation - $30,000) 17 (Design and Contingencies - $200,000) 18 (5) SR 0089, SR 0089 over Sixteen Mile 19 Creek, North East Township, Bridge 20 Replacement 490,000 21 (Base Construction Allocation - 22 $400,000) 23 (Land Allocation - $20,000) 24 (Design and Contingencies - $70,000) 25 (6) SR 0090, SR 0090 over Crooked Creek, 26 Girard Township, Bridge Replacement 1,420,000 27 (Base Construction Allocation - 28 $1,330,000) 29 (Land Allocation - $30,000) 30 (Design and Contingencies - $60,000) 19990S0504B1019 - 267 -
1 (7) SR 0090, SR 0090 under Cherry Street, 2 Summit Township, Bridge Replacement 1,600,000 3 (Base Construction Allocation - 4 $1,410,000) 5 (Land Allocation - $40,000) 6 (Design and Contingencies - $150,000) 7 (8) SR 0090, SR 0090 under Clark Road, 8 Harborcreek Township, Bridge 9 Replacement 2,100,000 10 (Base Construction Allocation - 11 $1,880,000) 12 (Land Allocation - $40,000) 13 (Design and Contingencies - $180,000) 14 (9) SR 0098, SR 0098 over Cussewago Creek, 15 Elk Creek Township, Bridge Replacement 400,000 16 (Base Construction Allocation - 17 $300,000) 18 (Land Allocation - $20,000) 19 (Design and Contingencies - $80,000) 20 (10) SR 0474, SR 0474 over Dean Run, 21 Venango Township, Bridge Replacement 200,000 22 (Base Construction Allocation - 23 $160,000) 24 (Land Allocation - $10,000) 25 (Design and Contingencies - $30,000) 26 (11) SR 1001, SR 1001 over Conrail, 27 Millcreek Township, Bridge Replacement 720,000 28 (Base Construction Allocation - 29 $600,000) 30 (Land Allocation - $20,000) 19990S0504B1019 - 268 -
1 (Design and Contingencies - $100,000) 2 (12) SR 1011, SR 1011 over Alder Brook, 3 Venango Township, Bridge Replacement 470,000 4 (Base Construction Allocation - 5 $400,000) 6 (Land Allocation - $10,000) 7 (Design and Contingencies - $60,000) 8 (13) SR 1013, SR 1013 over I-90, North 9 East Township, Bridge Replacement 1,220,000 10 (Base Construction Allocation - 11 $1,100,000) 12 (Land Allocation - $20,000) 13 (Design and Contingencies - $100,000) 14 (14) SR 3001, SR 3001 over Conneaut Creek, 15 Conneaut Township, Bridge Replacement 1,020,000 16 (Base Construction Allocation - 17 $900,000) 18 (Land Allocation - $20,000) 19 (Design and Contingencies - $100,000) 20 (15) SR 3003, SR 3003 over West Branch 21 Conneaut Creek, Conneaut Township, 22 Bridge Replacement 630,000 23 (Base Construction Allocation - 24 $550,000) 25 (Land Allocation - $20,000) 26 (Design and Contingencies - $60,000) 27 (16) SR 3014, SR 3014 over Trout Run, 28 Waterford Borough, Bridge Replacement 370,000 29 (Base Construction Allocation - 30 $300,000) 19990S0504B1019 - 269 -
1 (Land Allocation - $20,000) 2 (Design and Contingencies - $50,000) 3 (17) SR 4007, SR 4007 over I-90, Fairview 4 Township, Bridge Replacement 1,920,000 5 (Base Construction Allocation - 6 $1,800,000) 7 (Land Allocation - $20,000) 8 (Design and Contingencies - $100,000) 9 (18) SR 0020, Main Street Bridge over Elk 10 Creek, Girard Township, Bridge 11 Rehabilitation 5,450,000 12 (Base Construction Allocation - 13 $5,000,000) 14 (Land Allocation - $50,000) 15 (Design and Contingencies - $400,000) 16 (19) SR 0090, I-90 Bridge, Eastbound over 17 Six Mile Creek, Harborcreek Township, 18 Bridge Rehabilitation 6,350,000 19 (Base Construction Allocation - 20 $6,000,000) 21 (Land Allocation - $50,000) 22 (Design and Contingencies - $300,000) 23 (20) SR 0090, I-90 Bridge Westbound over 24 Six Mile Creek, Harborcreek Township, 25 Bridge Rehabilitation 7,350,000 26 (Base Construction Allocation - 27 $7,000,000) 28 (Land Allocation - $50,000) 29 (Design and Contingencies - $300,000) 30 (21) SR 0090, Remington Road Bridge over 19990S0504B1019 - 270 -
1 I-90, North East Township, Bridge 2 Replacement 500,000 3 (Base Construction Allocation - 4 $400,000) 5 (Land Allocation - $20,000) 6 (Design and Contingencies - $80,000) 7 (22) SR 0505, Bridge over Mill Creek, City 8 of Erie, Bridge Replacement 460,000 9 (Base Construction Allocation - 10 $400,000) 11 (Land Allocation - $20,000) 12 (Design and Contingencies - $40,000) 13 (23) SR 0955, Bridge over Six Mile Creek, 14 Harborcreek Township, Bridge 15 Replacement 480,000 16 (Base Construction Allocation - 17 $400,000) 18 (Land Allocation - $20,000) 19 (Design and Contingencies - $60,000) 20 (24) SR 1019, Gay Road Bridge over I-90 21 Eastbound and Westbound, North East 22 Township, Bridge Replacement 2,630,000 23 (Base Construction Allocation - 24 $2,500,000) 25 (Land Allocation - $20,000) 26 (Design and Contingencies - $110,000) 27 (25) SR 3002, Cherry Hill Road Bridge over 28 Conneaut Creek, Conneaut Township, 29 Bridge Replacement 620,000 30 (Base Construction Allocation - 19990S0504B1019 - 271 -
1 $540,000) 2 (Land Allocation - $20,000) 3 (Design and Contingencies - $60,000) 4 (26) SR 4014, Grandview Boulevard Bridge 5 over I-79 Northbound and Southbound, 6 City of Erie, Bridge Replacement 2,640,000 7 (Base Construction Allocation - 8 $2,500,000) 9 (Land Allocation - $40,000) 10 (Design and Contingencies - $100,000) 11 (27) SR 4016, West 38th Street Bridge over 12 I-79 Northbound and Southbound, City of 13 Erie, Bridge Rehabilitation 1,730,000 14 (Base Construction Allocation - 15 $1,500,000) 16 (Land Allocation - $30,000) 17 (Design and Contingencies - $200,000) 18 (28) SR 2008, West High Street Bridge over 19 Horton Run, Union Township, Bridge 20 Replacement 260,000 21 (Base Construction Allocation - 22 $220,000) 23 (Land Allocation - $10,000) 24 (Design and Contingencies - $30,000) 25 (29) SR 0079, BRIDGES OVER WALNUT CREEK <-- 26 AND WEST 32ND STREET, MILLCREEK 27 TOWNSHIP, BRIDGE REHABILITATION 2,800,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $2,000,000) 30 (LAND ALLOCATION - $10,000) 19990S0504B1019 - 272 -
1 (DESIGN AND CONTINGENCIES - $790,000) 2 (30) SR 0090, BECKMAN STREET BRIDGE OVER 3 I-90, GIRARD TOWNSHIP, BRIDGE 4 REHABILITATION 400,000 5 (BASE CONSTRUCTION ALLOCATION - 6 $340,000) 7 (LAND ALLOCATION - $10,000) 8 (DESIGN AND CONTINGENCIES - $50,000) 9 (31) SR 0090, CROOKED CREEK BRIDGE OVER 10 CROOKED CREEK, GIRARD TOWNSHIP, BRIDGE 11 REPLACEMENT 700,000 12 (BASE CONSTRUCTION ALLOCATION - 13 $640,000) 14 (LAND ALLOCATION - $10,000) 15 (DESIGN AND CONTINGENCIES - $50,000) 16 (32) SR 0090, ELK CREEK RAILROAD BRIDGE 17 OVER ELK CREEK, BRIDGE REPLACEMENT 999,000 18 (BASE CONSTRUCTION ALLOCATION - 19 $955,000) 20 (LAND ALLOCATION - $4,000) 21 (DESIGN AND CONTINGENCIES - $40,000) 22 (33) SR 0005, BRIDGE OVER EAST LAKE ROAD, 23 HARBOR CREEK TOWNSHIP, BRIDGE 24 REHABILITATION 800,000 25 (BASE CONSTRUCTION ALLOCATION - 26 $680,000) 27 (LAND ALLOCATION - $20,000) 28 (DESIGN AND CONTINGENCIES - $100,000) 29 (34) SR 0006, BRIDGE OVER TRIBUTARY OF 30 FRENCH CREEK, LEBOEUF TOWNSHIP, BRIDGE 19990S0504B1019 - 273 -
1 REPLACEMENT 300,000 2 (BASE CONSTRUCTION ALLOCATION - 3 $200,000) 4 (LAND ALLOCATION - $20,000) 5 (DESIGN AND CONTINGENCIES - $80,000) 6 (35) SR 0006, BRIDGE OVER BEAVER RUN, 7 WAYNE TOWNSHIP, BRIDGE REPLACEMENT 600,000 8 (BASE CONSTRUCTION ALLOCATION - 9 $500,000) 10 (LAND ALLOCATION - $20,000) 11 (DESIGN AND CONTINGENCIES - $80,000) 12 (36) SR 0008, BRIDGE OVER HUBBEL RUN, 13 AMITY TOWNSHIP, BRIDGE REPLACEMENT 500,000 14 (BASE CONSTRUCTION ALLOCATION - 15 $400,000) 16 (LAND ALLOCATION - $20,000) 17 (DESIGN AND CONTINGENCIES - $80,000) 18 (37) SR 0018, BRIDGE OVER N&W RAILROAD, 19 GIRARD BOROUGH, BRIDGE REPLACEMENT 1,920,000 20 (BASE CONSTRUCTION ALLOCATION - 21 $1,700,000) 22 (LAND ALLOCATION - $20,000) 23 (DESIGN AND CONTINGENCIES - $200,000) 24 (38) SR 0079, BRIDGE OVER SR 3006, 25 WASHINGTON TOWNSHIP, BRIDGE 26 REPLACEMENT 1,520,000 27 (BASE CONSTRUCTION ALLOCATION - 28 $1,300,000) 29 (LAND ALLOCATION - $20,000) 30 (DESIGN AND CONTINGENCIES - $200,000) 19990S0504B1019 - 274 -
1 (39) SR 0079, BRIDGE OVER SR 3008, 2 FRANKLIN TOWNSHIP, BRIDGE REPLACEMENT 920,000 3 (BASE CONSTRUCTION ALLOCATION - 4 $800,000) 5 (LAND ALLOCATION - $20,000) 6 (DESIGN AND CONTINGENCIES - $100,000) 7 (40) SR 0079, BRIDGE OVER T-481, STANCLIFF 8 ROAD, FRANKLIN TOWNSHIP, BRIDGE 9 REPLACEMENT 920,000 10 (BASE CONSTRUCTION ALLOCATION - 11 $800,000) 12 (LAND ALLOCATION - $20,000) 13 (DESIGN AND CONTINGENCIES - $100,000) 14 (41) SR 0080, BRIDGE OVER BRANCH OF FRENCH 15 CREEK, GREENFIELD TOWNSHIP, BRIDGE 16 REPLACEMENT 300,000 17 (BASE CONSTRUCTION ALLOCATION - 18 $200,000) 19 (LAND ALLOCATION - $20,000) 20 (DESIGN AND CONTINGENCIES - $80,000) 21 (42) SR 0090, I-90 BRIDGE OVER T-666, 22 GREENFIELD TOWNSHIP, BRIDGE 23 REPLACEMENT 1,420,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $1,200,000) 26 (LAND ALLOCATION - $20,000) 27 (DESIGN AND CONTINGENCIES - $200,000) 28 (43) SR 0090, I-90 BRIDGE OVER T-666, 29 GREENFIELD TOWNSHIP, BRIDGE 30 REPLACEMENT 1,120,000 19990S0504B1019 - 275 -
1 (BASE CONSTRUCTION ALLOCATION - 2 $1,000,000) 3 (LAND ALLOCATION - $20,000) 4 (DESIGN AND CONTINGENCIES - $100,000) 5 (44) SR 0090, I-90 EASTBOUND BRIDGE OVER 6 SR 0089, NORTH EAST TOWNSHIP, BRIDGE 7 REPLACEMENT 2,600,000 8 (BASE CONSTRUCTION ALLOCATION - 9 $2,320,000) 10 (LAND ALLOCATION - $20,000) 11 (DESIGN AND CONTINGENCIES - $260,000) 12 (45) SR 0090, I-90 WESTBOUND BRIDGE OVER 13 SR 0089, NORTH EAST TOWNSHIP, BRIDGE 14 REPLACEMENT 2,400,000 15 (BASE CONSTRUCTION ALLOCATION - 16 $2,140,000) 17 (LAND ALLOCATION - $20,000) 18 (DESIGN AND CONTINGENCIES - $240,000) 19 (46) SR 0090, SHADOUCK ROAD OVER I-90, 20 NORTH EAST TOWNSHIP, BRIDGE 21 REHABILITATION 2,100,000 22 (BASE CONSTRUCTION ALLOCATION - 23 $1,880,000) 24 (LAND ALLOCATION - $20,000) 25 (DESIGN AND CONTINGENCIES - $200,000) 26 (47) SR 0090, I-90 BRIDGE OVER CONRAIL, 27 NORTH EAST TOWNSHIP, BRIDGE 28 REPLACEMENT 2,000,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $1,500,000) 19990S0504B1019 - 276 -
1 (LAND ALLOCATION - $100,000) 2 (DESIGN AND CONTINGENCIES - $400,000) 3 (48) SR 0090, I-90 EASTBOUND BRIDGE OVER 4 PA 20, NORTH EAST TOWNSHIP, BRIDGE 5 REHABILITATION 460,000 6 (BASE CONSTRUCTION ALLOCATION - 7 $400,000) 8 (LAND ALLOCATION - $10,000) 9 (DESIGN AND CONTINGENCIES - $50,000) 10 (49) SR 0090, I-90 WESTBOUND BRIDGE OVER 11 PA 20, NORTH EAST TOWNSHIP, BRIDGE 12 REHABILITATION 460,000 13 (BASE CONSTRUCTION ALLOCATION - 14 $400,000) 15 (LAND ALLOCATION - $10,000) 16 (DESIGN AND CONTINGENCIES - $50,000) 17 (50) SR 0090, I-90 EASTBOUND BRIDGE OVER 18 20 MILE CREEK, NORTH EAST TOWNSHIP, 19 BRIDGE REHABILITATION 1,620,000 20 (BASE CONSTRUCTION ALLOCATION - 21 $1,500,000) 22 (LAND ALLOCATION - $20,000) 23 (DESIGN AND CONTINGENCIES - $100,000) 24 (51) SR 0090, I-90 WESTBOUND BRIDGE OVER 25 20 MILE CREEK, NORTH EAST TOWNSHIP, 26 BRIDGE REHABILITATION 1,620,000 27 (BASE CONSTRUCTION ALLOCATION - 28 $1,500,000) 29 (LAND ALLOCATION - $20,000) 30 (DESIGN AND CONTINGENCIES - $100,000) 19990S0504B1019 - 277 -
1 (52) SR 0097, BRIDGE OVER BRANCH OF FRENCH 2 CREEK, UNION CITY BOROUGH, BRIDGE 3 REPLACEMENT 500,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $400,000) 6 (LAND ALLOCATION - $20,000) 7 (DESIGN AND CONTINGENCIES - $80,000) 8 (53) SR 0426, BRIDGE OVER SR 0089, NORTH 9 EAST BOROUGH, BRIDGE REPLACEMENT 600,000 10 (BASE CONSTRUCTION ALLOCATION - 11 $500,000) 12 (LAND ALLOCATION - $20,000) 13 (DESIGN AND CONTINGENCIES - $80,000) 14 (54) SR 1004, BRIDGE OVER WEST BRANCH OF 15 FRENCH CREEK, GREENFIELD TOWNSHIP, 16 BRIDGE REPLACEMENT 800,000 17 (BASE CONSTRUCTION ALLOCATION - 18 $700,000) 19 (LAND ALLOCATION - $20,000) 20 (DESIGN AND CONTINGENCIES - $80,000) 21 (55) SR 1006, MOORHEADVILLE ROAD BRIDGE 22 OVER I-90, NORTH EAST TOWNSHIP, BRIDGE 23 REPLACEMENT 2,600,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $2,330,000) 26 (LAND ALLOCATION - $20,000) 27 (DESIGN AND CONTINGENCIES - $250,000) 28 (56) SR 1017, BRIDGE OVER AVERILL RUN, 29 NORTH EAST TOWNSHIP, BRIDGE 30 REPLACEMENT 200,000 19990S0504B1019 - 278 -
1 (BASE CONSTRUCTION ALLOCATION - 2 $100,000) 3 (LAND ALLOCATION - $20,000) 4 (DESIGN AND CONTINGENCIES - $80,000) 5 (57) SR 2008, BRIDGE OVER FRENCH CREEK, 6 UNION TOWNSHIP, BRIDGE REPLACEMENT 200,000 7 (BASE CONSTRUCTION ALLOCATION - 8 $100,000) 9 (LAND ALLOCATION - $20,000) 10 (DESIGN AND CONTINGENCIES - $80,000) 11 (58) SR 2008, BRIDGE OVER FRENCH CREEK, 12 UNION CITY BOROUGH, BRIDGE REPLACEMENT 1,150,000 13 (BASE CONSTRUCTION ALLOCATION - 14 $1,000,000) 15 (LAND ALLOCATION - $20,000) 16 (DESIGN AND CONTINGENCIES - $130,000) 17 (59) SR 2010, BRIDGE OVER PINE RUN, UNION 18 TOWNSHIP, BRIDGE REPLACEMENT 200,000 19 (BASE CONSTRUCTION ALLOCATION - 20 $100,000) 21 (LAND ALLOCATION - $20,000) 22 (DESIGN AND CONTINGENCIES - $80,000) 23 (60) SR 2025, BRIDGE NO.2 OVER SCIOTA 24 ROAD, WAYNE TOWNSHIP, BRIDGE 25 REPLACEMENT 200,000 26 (BASE CONSTRUCTION ALLOCATION - 27 $100,000) 28 (LAND ALLOCATION - $20,000) 29 (DESIGN AND CONTINGENCIES - $80,000) 30 (61) SR 3001, BRIDGE NO.2 OVER ASHTABULA 19990S0504B1019 - 279 -
1 CREEK, CONNEAUT TOWNSHIP, BRIDGE 2 REPLACEMENT 400,000 3 (BASE CONSTRUCTION ALLOCATION - 4 $300,000) 5 (LAND ALLOCATION - $20,000) 6 (DESIGN AND CONTINGENCIES - $80,000) 7 (62) SR 0005, BRIDGE OVER LINCOLN AVENUE, 8 CITY OF ERIE, BRIDGE REPLACEMENT 900,000 9 (BASE CONSTRUCTION ALLOCATION - 10 $800,000) 11 (LAND ALLOCATION - $20,000) 12 (DESIGN AND CONTINGENCIES - $80,000) 13 (63) SR 0020, WESTBOUND BRIDGE OVER I-79, 14 CITY OF ERIE, BRIDGE REHABILITATION 4,330,000 15 (BASE CONSTRUCTION ALLOCATION - 16 $4,000,000) 17 (LAND ALLOCATION - $30,000) 18 (DESIGN AND CONTINGENCIES - $300,000) 19 (64) SR 0079, SOUTHBOUND BRIDGE OVER WEST 20 32ND STREET, CITY OF ERIE, BRIDGE 21 REPLACEMENT 720,000 22 (BASE CONSTRUCTION ALLOCATION - 23 $600,000) 24 (LAND ALLOCATION - $20,000) 25 (DESIGN AND CONTINGENCIES - $100,000) 26 (65) SR 3002, BRIDGE NO.2 OVER CHERRY HILL 27 ROAD, CONNEAUT TOWNSHIP, BRIDGE 28 REPLACEMENT 700,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $600,000) 19990S0504B1019 - 280 -
1 (LAND ALLOCATION - $20,000) 2 (DESIGN AND CONTINGENCIES - $80,000) 3 (66) SR 3002, BRIDGE NO.2 OVER ASHTABULA 4 CREEK, CONNEAUT TOWNSHIP, BRIDGE 5 REPLACEMENT 400,000 6 (BASE CONSTRUCTION ALLOCATION - 7 $300,000) 8 (LAND ALLOCATION - $20,000) 9 (DESIGN AND CONTINGENCIES - $80,000) 10 (67) SR 0005, BRIDGE OVER WALNUT CREEK, 11 FAIRVIEW TOWNSHIP, BRIDGE 12 REHABILITATION 500,000 13 (BASE CONSTRUCTION ALLOCATION - 14 $410,000) 15 (LAND ALLOCATION - $40,000) 16 (DESIGN AND CONTINGENCIES - $50,000) 17 (68) SR 0090, EASTBOUND BRIDGE OVER 18 FRANKLIN ROAD, T-404, FAIRVIEW 19 TOWNSHIP, BRIDGE REPLACEMENT 1,200,000 20 (BASE CONSTRUCTION ALLOCATION - 21 $1,080,000) 22 (LAND ALLOCATION - $20,000) 23 (DESIGN AND CONTINGENCIES - $100,000) 24 (69) SR 0020, BRIDGE OVER WALNUT CREEK, 25 FAIRVIEW TOWNSHIP, BRIDGE 26 REHABILITATION 400,000 27 (BASE CONSTRUCTION ALLOCATION - 28 $300,000) 29 (LAND ALLOCATION - $20,000) 30 (DESIGN AND CONTINGENCIES - $80,000) 19990S0504B1019 - 281 -
1 (70) SR 0098, BRIDGE OVER I-90, FAIRVIEW 2 TOWNSHIP, BRIDGE REHABILITATION 860,000 3 (BASE CONSTRUCTION ALLOCATION - 4 $800,000) 5 (LAND ALLOCATION - $10,000) 6 (DESIGN AND CONTINGENCIES - $50,000) 7 (71) SR 0090, BRIDGE OVER PLATZ ROAD, 8 FAIRVIEW TOWNSHIP, BRIDGE 9 REHABILITATION 350,000 10 (BASE CONSTRUCTION ALLOCATION - 11 $300,000) 12 (LAND ALLOCATION - $20,000) 13 (DESIGN AND CONTINGENCIES - $30,000) 14 (72) SR 0090, WESTBOUND BRIDGE OVER T-404, 15 FAIRVIEW TOWNSHIP, BRIDGE REPLACEMENT 1,200,000 16 (BASE CONSTRUCTION ALLOCATION - 17 $1,080,000) 18 (LAND ALLOCATION - $20,000) 19 (DESIGN AND CONTINGENCIES - $100,000) 20 (73) SR 0018, BRIDGE OVER ELK CREEK, 21 GIRARD BOROUGH, BRIDGE REPLACEMENT 1,020,000 22 (BASE CONSTRUCTION ALLOCATION - 23 $800,000) 24 (LAND ALLOCATION - $20,000) 25 (DESIGN AND CONTINGENCIES - $200,000) 26 (74) SR 3014, BRIDGE OVER FRANKLIN CENTER 27 ROAD BRIDGE, GIRARD TOWNSHIP, BRIDGE 28 REPLACEMENT 400,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $300,000) 19990S0504B1019 - 282 -
1 (LAND ALLOCATION - $20,000) 2 (DESIGN AND CONTINGENCIES - $80,000) 3 (75) SR 0090, EASTBOUND BRIDGE OVER ELK 4 CREEK, GIRARD TOWNSHIP, BRIDGE 5 REPLACEMENT 6,500,000 6 (BASE CONSTRUCTION ALLOCATION - 7 $6,280,000) 8 (LAND ALLOCATION - $20,000) 9 (DESIGN AND CONTINGENCIES - $200,000) 10 (76) SR 0090, WESTBOUND BRIDGE OVER ELK 11 CREEK AND RAILROAD TRACKS, GIRARD 12 TOWNSHIP, BRIDGE REPLACEMENT 6,000,000 13 (BASE CONSTRUCTION ALLOCATION - 14 $5,780,000) 15 (LAND ALLOCATION - $20,000) 16 (DESIGN AND CONTINGENCIES - $200,000) 17 (77) SR 0090, WESTBOUND BRIDGE OVER NEIGER 18 ROAD, GIRARD TOWNSHIP, BRIDGE 19 REPLACEMENT 1,200,000 20 (BASE CONSTRUCTION ALLOCATION - 21 $1,080,000) 22 (LAND ALLOCATION - $20,000) 23 (DESIGN AND CONTINGENCIES - $100,000) 24 (78) SR 0020, BRIDGE OVER ELK CREEK, 25 GIRARD TOWNSHIP, BRIDGE REHABILITATION 8,500,000 26 (BASE CONSTRUCTION ALLOCATION - 27 $7,600,000) 28 (LAND ALLOCATION - $50,000) 29 (DESIGN AND CONTINGENCIES - $850,000) 30 (79) SR 0090, EASTBOUND BRIDGE OVER NEIGER 19990S0504B1019 - 283 -
1 ROAD, GIRARD TOWNSHIP, BRIDGE 2 REPLACEMENT 2,000,000 3 (BASE CONSTRUCTION ALLOCATION - 4 $1,080,000) 5 (LAND ALLOCATION - $20,000) 6 (DESIGN AND CONTINGENCIES - $100,000) 7 (80) SR 0090, EASTBOUND BRIDGE OVER ELK 8 CREEK AND RAILROAD, GIRARD TOWNSHIP, 9 BRIDGE REPLACEMENT 6,000,000 10 (BASE CONSTRUCTION ALLOCATION - 11 $5,780,000) 12 (LAND ALLOCATION - $20,000) 13 (DESIGN AND CONTINGENCIES - $200,000) 14 (81) SR 0090, WESTBOUND BRIDGE OVER ELK 15 CREEK, GIRARD TOWNSHIP, BRIDGE 16 REPLACEMENT 6,500,000 17 (BASE CONSTRUCTION ALLOCATION - 18 $6,280,000) 19 (LAND ALLOCATION - $20,000) 20 (DESIGN AND CONTINGENCIES - $200,000) 21 (82) SR 0090, BRIDGE OVER FOUR MILE CREEK, 22 GREENE TOWNSHIP, BRIDGE REHABILITATION 800,000 23 (BASE CONSTRUCTION ALLOCATION - 24 $700,000) 25 (LAND ALLOCATION - $20,000) 26 (DESIGN AND CONTINGENCIES - $80,000) 27 (83) SR 0090, BRIDGE OVER MOORE ROAD, 28 GREENE TOWNSHIP, BRIDGE REHABILITATION 1,700,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $1,380,000) 19990S0504B1019 - 284 -
1 (LAND ALLOCATION - $20,000) 2 (DESIGN AND CONTINGENCIES - $300,000) 3 (84) SR 0090, BRIDGE OVER CLARK ROAD, 4 HARBORCREEK TOWNSHIP, BRIDGE 5 REPLACEMENT 2,820,000 6 (BASE CONSTRUCTION ALLOCATION - 7 $2,500,000) 8 (LAND ALLOCATION - $20,000) 9 (DESIGN AND CONTINGENCIES - $300,000) 10 (85) SR 0020, BRIDGE OVER FOUR MILE CREEK, 11 HARBORCREEK TOWNSHIP, BRIDGE 12 REPLACEMENT 400,000 13 (BASE CONSTRUCTION ALLOCATION - 14 $300,000) 15 (LAND ALLOCATION - $20,000) 16 (DESIGN AND CONTINGENCIES - $80,000) 17 (86) SR 0090, WESTBOUND BRIDGE OVER SR 18 0531, HARBORCREEK TOWNSHIP, BRIDGE 19 REPLACEMENT 1,520,000 20 (BASE CONSTRUCTION ALLOCATION - 21 $1,300,000) 22 (LAND ALLOCATION - $20,000) 23 (DESIGN AND CONTINGENCIES - $200,000) 24 (87) SR 0090, BRIDGE OVER JORDAN ROAD, 25 HARBORCREEK TOWNSHIP, BRIDGE 26 REHABILITATION 2,800,000 27 (BASE CONSTRUCTION ALLOCATION - 28 $2,480,000) 29 (LAND ALLOCATION - $20,000) 30 (DESIGN AND CONTINGENCIES - $300,000) 19990S0504B1019 - 285 -
1 (88) SR 0955, BRIDGE OVER SEVEN MILE 2 CREEK, HARBORCREEK TOWNSHIP, BRIDGE 3 REPLACEMENT 830,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $700,000) 6 (LAND ALLOCATION - $30,000) 7 (DESIGN AND CONTINGENCIES - $100,000) 8 (89) SR 0090, EASTBOUND BRIDGE OVER SR 9 0531, HARBORCREEK TOWNSHIP, BRIDGE 10 REPLACEMENT 1,520,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $1,300,000) 13 (LAND ALLOCATION - $20,000) 14 (DESIGN AND CONTINGENCIES - $200,000) 15 (90) SR 0005, BRIDGE OVER ELK CREEK, LAKE 16 CITY BOROUGH, BRIDGE REPLACEMENT 3,220,000 17 (BASE CONSTRUCTION ALLOCATION - 18 $2,900,000) 19 (LAND ALLOCATION - $20,000) 20 (DESIGN AND CONTINGENCIES - $300,000) 21 (91) SR 0006, BRIDGE OVER MILL VILLAGE 22 TRUSS, LEBOEUF TOWNSHIP, BRIDGE 23 REPLACEMENT 3,046,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $2,980,000) 26 (LAND ALLOCATION - $26,000) 27 (DESIGN AND CONTINGENCIES - $40,000) 28 (92) SR 0832, BRIDGE OVER I-90, MCKEAN 29 TOWNSHIP, BRIDGE REHABILITATION 3,000,000 30 (BASE CONSTRUCTION ALLOCATION - 19990S0504B1019 - 286 -
1 $2,670,000) 2 (LAND ALLOCATION - $30,000) 3 (DESIGN AND CONTINGENCIES - $300,000) 4 (93) SR 4013, BRIDGE OVER ELK CREEK, 5 MCKEAN TOWNSHIP, BRIDGE REPLACEMENT 600,000 6 (BASE CONSTRUCTION ALLOCATION - 7 $500,000) 8 (LAND ALLOCATION - $20,000) 9 (DESIGN AND CONTINGENCIES - $80,000) 10 (94) SR 0099, BRIDGE OVER STANCLIFF ROAD, 11 MCKEAN TOWNSHIP, BRIDGE REPLACEMENT 1,620,000 12 (BASE CONSTRUCTION ALLOCATION - 13 $1,400,000) 14 (LAND ALLOCATION - $20,000) 15 (DESIGN AND CONTINGENCIES - $200,000) 16 (95) SR 0090, BRIDGE OVER MILLFAIR ROAD, 17 MCKEAN TOWNSHIP, BRIDGE REHABILITATION 1,820,000 18 (BASE CONSTRUCTION ALLOCATION - 19 $1,500,000) 20 (LAND ALLOCATION - $20,000) 21 (DESIGN AND CONTINGENCIES - $300,000) 22 (96) SR 0090, BRIDGE OVER SR 0008, 23 NORTHBOUND AND SOUTHBOUND, MILLCREEK 24 TOWNSHIP, BRIDGE REPLACEMENT 1,720,000 25 (BASE CONSTRUCTION ALLOCATION - 26 $1,500,000) 27 (LAND ALLOCATION - $20,000) 28 (DESIGN AND CONTINGENCIES - $200,000) 29 (97) SR 4012, BRIDGE OVER I-79, MILLCREEK 30 TOWNSHIP, BRIDGE REPLACEMENT 5,020,000 19990S0504B1019 - 287 -
1 (BASE CONSTRUCTION ALLOCATION - 2 $4,500,000) 3 (LAND ALLOCATION - $20,000) 4 (DESIGN AND CONTINGENCIES - $500,000) 5 (98) SR 0019, BRIDGE NO.2 OVER WALNUT 6 CREEK, MILLCREEK TOWNSHIP, BRIDGE 7 REPLACEMENT 1,890,000 8 (BASE CONSTRUCTION ALLOCATION - 9 $1,700,000) 10 (LAND ALLOCATION - $20,000) 11 (DESIGN AND CONTINGENCIES - $170,000) 12 (99) SR 0079, SOUTHBOUND BRIDGE OVER 13 WALNUT CREEK, MILLCREEK TOWNSHIP, 14 BRIDGE REPLACEMENT 420,000 15 (BASE CONSTRUCTION ALLOCATION - 16 $300,000) 17 (LAND ALLOCATION - $20,000) 18 (DESIGN AND CONTINGENCIES - $100,000) 19 (100) SR 0090, BRIDGE OVER POND ROAD, 20 SPRINGFIELD TOWNSHIP, BRIDGE 21 REPLACEMENT 1,600,000 22 (BASE CONSTRUCTION ALLOCATION - 23 $1,400,000) 24 (LAND ALLOCATION - $50,000) 25 (DESIGN AND CONTINGENCIES - $150,000) 26 (101) SR 0090, BRIDGE OVER MCKEES ROAD, 27 SPRINGFIELD TOWNSHIP, BRIDGE 28 REPLACEMENT 1,550,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $1,380,000) 19990S0504B1019 - 288 -
1 (LAND ALLOCATION - $20,000) 2 (DESIGN AND CONTINGENCIES - $150,000) 3 (102) SR 0090, BRIDGE OVER HUNTLEY ROAD, 4 SPRINGFIELD TOWNSHIP, BRIDGE 5 REPLACEMENT 1,700,000 6 (BASE CONSTRUCTION ALLOCATION - 7 $1,500,000) 8 (LAND ALLOCATION - $50,000) 9 (DESIGN AND CONTINGENCIES - $150,000) 10 (103) SR 0020, BRIDGE OVER CROOKED CREEK, 11 SPRINGFIELD TOWNSHIP, BRIDGE 12 REPLACEMENT 930,000 13 (BASE CONSTRUCTION ALLOCATION - 14 $800,000) 15 (LAND ALLOCATION - $30,000) 16 (DESIGN AND CONTINGENCIES - $100,000) 17 (104) SR 0090, BRIDGE OVER STANFORD ROAD, 18 SPRINGFIELD TOWNSHIP, BRIDGE 19 REPLACEMENT 2,800,000 20 (BASE CONSTRUCTION ALLOCATION - 21 $2,450,000) 22 (LAND ALLOCATION - $50,000) 23 (DESIGN AND CONTINGENCIES - $300,000) 24 (105) SR 0090, BRIDGE OVER WALNUT CREEK, 25 SUMMIT TOWNSHIP, BRIDGE REPLACEMENT 2,340,000 26 (BASE CONSTRUCTION ALLOCATION - 27 $2,100,000) 28 (LAND ALLOCATION - $40,000) 29 (DESIGN AND CONTINGENCIES - $200,000) 30 (106) SR 0099, BRIDGE OVER I-90, SUMMIT 19990S0504B1019 - 289 -
1 TOWNSHIP, BRIDGE REPLACEMENT 2,700,000 2 (BASE CONSTRUCTION ALLOCATION - 3 $2,400,000) 4 (LAND ALLOCATION - $50,000) 5 (DESIGN AND CONTINGENCIES - $250,000) 6 (107) SR 0097, BRIDGE OVER LEBOEUF CREEK, 7 SUMMIT TOWNSHIP, BRIDGE REPLACEMENT 600,000 8 (BASE CONSTRUCTION ALLOCATION - 9 $500,000) 10 (LAND ALLOCATION - $20,000) 11 (DESIGN AND CONTINGENCIES - $80,000) 12 (108) SR 2018, RAILROAD BRIDGE OVER LOVELL 13 ROAD, CONCORD TOWNSHIP, BRIDGE 14 REHABILITATION 200,000 15 (BASE CONSTRUCTION ALLOCATION - 16 $100,000) 17 (LAND ALLOCATION - $25,000) 18 (DESIGN AND CONTINGENCIES - $75,000) 19 (109) I-90 BRIDGE OVER SIXTEEN MILE CREEK, 20 NORTHEAST TOWNSHIP, BRIDGE 21 REHABILITATION 500,000 22 (BASE CONSTRUCTION ALLOCATION - 23 $90,000) 24 (LAND ALLOCATION - $10,000) 25 (DESIGN AND CONTINGENCIES - $400,000) 26 Section 30. Fayette County. 27 (a) Local Bridges 28 (1) Brownsville Township, Lynn Run Road 29 Bridge over Redstone Creek, Bridge 30 Replacement 200,000 19990S0504B1019 - 290 -
1 (Base Construction Allocation - 2 $130,000) 3 (Land Allocation - $10,000) 4 (Design and Contingencies - $60,000) 5 (2) Dunbar Township, Falls Avenue Bridge 6 over Possum Run, Bridge Replacement 450,000 7 (Base Construction Allocation - 8 $350,000) 9 (Land Allocation - $15,000) 10 (Design and Contingencies - $85,000) 11 (3) Georges Township, County Bridge No.162 12 over Mountain Creek, Bridge 13 Replacement 640,000 14 (Base Construction Allocation - 15 $425,000) 16 (Land Allocation - $40,000) 17 (Design and Contingencies - $175,000) 18 (4) German Township, Footedale Bridge 19 No.66 over Dunlap Creek, Bridge 20 Replacement 498,000 21 (Base Construction Allocation - 22 $313,000) 23 (Land Allocation - $35,000) 24 (Design and Contingencies - $150,000) 25 (5) German Township, County Bridge No.54 26 over Browns Run, Bridge Replacement 793,000 27 (Base Construction Allocation - 28 $563,000) 29 (Land Allocation - $50,000) 30 (Design and Contingencies - $180,000) 19990S0504B1019 - 291 -
1 (6) German Township, Leckrone Bridge No.54 2 over Browns Run, Bridge Replacement 430,000 3 (Base Construction Allocation - 4 $350,000) 5 (Land Allocation - $5,000) 6 (Design and Contingencies - $75,000) 7 (7) Menallen Township, T-509, Bridge over 8 Branch of Dunlap Creek, Bridge 9 Replacement 165,000 10 (Base Construction Allocation - 11 $110,000) 12 (Land Allocation - $5,000) 13 (Design and Contingencies - $50,000) 14 (8) Menallen Township, Fan Hallow Road 15 Bridge over Fans Run, Bridge 16 Replacement 145,000 17 (Base Construction Allocation - 18 $90,000) 19 (Land Allocation - $5,000) 20 (Design and Contingencies - $50,000) 21 (9) Menallen and North Union Townships, 22 Fan Hollow Bridge No.184 over Jennings 23 Run, Bridge Replacement 440,000 24 (Base Construction Allocation - 25 $350,000) 26 (Land Allocation - $10,000) 27 (Design and Contingencies - $80,000) 28 (10) Nicholson Township, County Bridge 29 No.29 over York Run, Bridge 30 Replacement 535,000 19990S0504B1019 - 292 -
1 (Base Construction Allocation - 2 $350,000) 3 (Land Allocation - $35,000) 4 (Design and Contingencies - $150,000) 5 (11) Redstone Township, Merrittstown 6 Bridge No.147 over Dunlap Creek, Bridge 7 Replacement 435,000 8 (Base Construction Allocation - 9 $350,000) 10 (Land Allocation - $10,000) 11 (Design and Contingencies - $75,000) 12 (12) South Union Township, T-479, Leith 13 Bridge No.41 over Redstone Creek, 14 Bridge Replacement 690,000 15 (Base Construction Allocation - 16 $475,000) 17 (Land Allocation - $40,000) 18 (Design and Contingencies - $175,000) 19 (13) Steward Township, T-798, Meadow Run 20 Bridge No.82 over Meadow Run, Bridge 21 Replacement 825,000 22 (Base Construction Allocation - 23 $575,000) 24 (Land Allocation - $55,000) 25 (Design and Contingencies - $195,000) 26 (14) Springhill Township, T-335, County 27 Bridge No.92 over York Run, Bridge 28 Replacement 1,438,000 29 (Base Construction Allocation - 30 $1,113,000) 19990S0504B1019 - 293 -
1 (Land Allocation - $75,000) 2 (Design and Contingencies - $250,000) 3 (15) Springfield Township, T-593, County 4 Bridge No.111 over Mill Run, Bridge 5 Replacement 320,000 6 (Base Construction Allocation - 7 $225,000) 8 (Land Allocation - $20,000) 9 (Design and Contingencies - $75,000) 10 (16) North Union Township, T-535 over 11 Redstone Creek, Bridge Replacement 825,000 12 (Base Construction Allocation - 13 $625,000) 14 (Land Allocation - $25,000) 15 (Design and Contingencies - $175,000) 16 (17) North Union Township, T-557 over 17 Redstone Creek, Bridge Replacement 450,000 18 (Base Construction Allocation - 19 $275,000) 20 (Land Allocation - $50,000) 21 (Design and Contingencies - $125,000) 22 (18) Georges Township, T-387, County 23 Bridge No.102 over York Run, Bridge 24 Rehabilitation 320,000 25 (Base Construction Allocation - 26 $225,000) 27 (Land Allocation - $20,000) 28 (Design and Contingencies - $75,000) 29 (19) South Union Township, T-459, Township 30 Bridge No.1 over Lick Run, Bridge 19990S0504B1019 - 294 -
1 Replacement 280,000 2 (Base Construction Allocation - 3 $175,000) 4 (Land Allocation - $25,000) 5 (Design and Contingencies - $80,000) 6 (20) Stewart Township, T-415, County 7 Bridge No.63 over Meadow Run, Bridge 8 Replacement 1,005,000 9 (Base Construction Allocation - 10 $775,000) 11 (Land Allocation - $50,000) 12 (Design and Contingencies - $180,000) 13 (21) German Township, County Bridge No.54 14 over Browns Run at Leith Community, 15 Bridge Replacement 430,000 16 (Base Construction Allocation - 17 $350,000) 18 (Land Allocation - $5,000) 19 (Design and Contingencies - $75,000) 20 (b) State Bridges 21 (1) SR 0021, Masontown Bridge over 22 Monongahela River, Railroad and Private 23 Road, German Township, Bridge Painting 1,500,000 24 (Base Construction Allocation - 25 $1,500,000) 26 (2) SR 0031, Jacobs Creek Bridge over 27 Branch of Jacobs Creek, Bullskin 28 Township, Bridge Replacement 290,000 29 (Base Construction Allocation - 30 $180,000) 19990S0504B1019 - 295 -
1 (Land Allocation - $35,000) 2 (Design and Contingencies - $75,000) 3 (3) SR 0119, Memorial Bridge over 4 Youghiogheny River, Connellsville 5 Borough, Bridge Painting 100,000 6 (Base Construction Allocation - 7 $100,000) 8 (4) SR 0201, Furnace Run Bridge over 9 Furnace Run, Franklin Township, Bridge 10 Replacement 445,000 11 (Base Construction Allocation - 12 $245,000) 13 (Land Allocation - $25,000) 14 (Design and Contingencies - $175,000) 15 (5) SR 0711, Crawford Avenue Bridge over 16 Youghiogheny River, Connellsville 17 Borough, Bridge Painting 100,000 18 (Base Construction Allocation - 19 $100,000) 20 (6) SR 0982, Jacobs Creek Bridge over 21 Branch of Jacobs Creek, Bullskin 22 Township, Bridge Replacement 335,000 23 (Base Construction Allocation - 24 $225,000) 25 (Land Allocation - $35,000) 26 (Design and Contingencies - $75,000) 27 (7) SR 0982, Bridge over Mounts Creek, 28 Bullskin Township, Bridge Painting 105,000 29 (Base Construction Allocation - 30 $105,000) 19990S0504B1019 - 296 -
1 (8) SR 1051, Mounts Creek Bridge over 2 Mounts Creek, Bullskin Township, Bridge 3 Replacement 436,000 4 (Base Construction Allocation - 5 $236,000) 6 (Land Allocation - $25,000) 7 (Design and Contingencies - $175,000) 8 (9) SR 3013, Browns Run Bridge over Browns 9 Run, German Township, Bridge 10 Replacement 631,000 11 (Base Construction Allocation - 12 $431,000) 13 (Land Allocation - $25,000) 14 (Design and Contingencies - $175,000) 15 (10) SR 3015, Muddy Run Bridge over Muddy 16 Run, Georges Township, Bridge Painting 33,000 17 (Base Construction Allocation - 18 $33,000) 19 (11) SR 4038, Washington Run Bridge over 20 Washington Run, Perry Township, Bridge 21 Replacement 640,000 22 (Base Construction Allocation - 23 $440,000) 24 (Land Allocation - $25,000) 25 (Design and Contingencies - $175,000) 26 (12) SR 0381, SR 0381 over Stoney Run, 27 Wharton Township, Bridge Replacement 663,000 28 (Base Construction Allocation - 29 $463,000) 30 (Land Allocation - $50,000) 19990S0504B1019 - 297 -
1 (Design and Contingencies - $150,000) 2 (13) SR 0819, SR 0819 over Branch of 3 Jacobs Creek, Lower Tyrone Township, 4 Bridge Replacement 240,000 5 (Base Construction Allocation - 6 $125,000) 7 (Land Allocation - $15,000) 8 (Design and Contingencies - $100,000) 9 (14) SR 1021, SR 1021 over Breakneck Run, 10 Bullskin Township, Bridge Replacement 650,000 11 (Base Construction Allocation - 12 $475,000) 13 (Land Allocation - $50,000) 14 (Design and Contingencies - $125,000) 15 (15) SR 1031, SR 1031 over Galley Run, 16 Upper Tyrone Township, Bridge 17 Replacement 475,000 18 (Base Construction Allocation - 19 $325,000) 20 (Land Allocation - $25,000) 21 (Design and Contingencies - $125,000) 22 (16) SR 1031, SR 1031 over Branch of 23 Galley Run, Upper Tyrone Township, 24 Bridge Replacement 613,000 25 (Base Construction Allocation - 26 $413,000) 27 (Land Allocation - $50,000) 28 (Design and Contingencies - $150,000) 29 (17) SR 1044, SR 1044 over Branch of 30 Mounts Creek, Bullskin Township, Bridge 19990S0504B1019 - 298 -
1 Replacement 350,000 2 (Base Construction Allocation - 3 $200,000) 4 (Land Allocation - $25,000) 5 (Design and Contingencies - $125,000) 6 (18) SR 2003, SR 2003 over Chaney Run, 7 Wharton Township, Bridge Replacement 290,000 8 (Base Construction Allocation - 9 $175,000) 10 (Land Allocation - $15,000) 11 (Design and Contingencies - $100,000) 12 (19) SR 3003, SR 3003 at Nicholson 13 Township Border, Springhill Township, 14 Bridge Replacement 1,400,000 15 (Base Construction Allocation - 16 $1,125,000) 17 (Land Allocation - $75,000) 18 (Design and Contingencies - $200,000) 19 (20) SR 3003, SR 3003 over Georges Creek, 20 Springhill Township, Bridge 21 Replacement 1,450,000 22 (Base Construction Allocation - 23 $1,150,000) 24 (Land Allocation - $75,000) 25 (Design and Contingencies - $225,000) 26 (21) SR 3003, SR 3003 Nicholson Township 27 over Georges Creek, Springhill 28 Township, Bridge Replacement 1,200,000 29 (Base Construction Allocation - 30 $975,000) 19990S0504B1019 - 299 -
1 (Land Allocation - $50,000) 2 (Design and Contingencies - $175,000) 3 (22) SR 3009, SR 3009 over Georges Creek, 4 Springhill Township, Bridge 5 Replacement 863,000 6 (Base Construction Allocation - 7 $688,000) 8 (Land Allocation - $25,000) 9 (Design and Contingencies - $150,000) 10 (23) SR 3013, SR 3013 over Middle Run, 11 German Township, Bridge Replacement 900,000 12 (Base Construction Allocation - 13 $650,000) 14 (Land Allocation - $75,000) 15 (Design and Contingencies - $175,000) 16 (24) SR 4027, SR 4027 over Little Redstone 17 Creek, Jefferson Township, Bridge 18 Replacement 538,000 19 (Base Construction Allocation - 20 $338,000) 21 (Land Allocation - $50,000) 22 (Design and Contingencies - $150,000) 23 (25) SR 4044, SR 4044 over Downers Run, 24 Washington Township, Bridge 25 Replacement 800,000 26 (Base Construction Allocation - 27 $575,000) 28 (Land Allocation - $50,000) 29 (Design and Contingencies - $175,000) 30 (26) SR 4046, SR 4046 over Lutz Run and 19990S0504B1019 - 300 -
1 Abandoned Railroad, Washington 2 Township, Bridge Replacement 1,400,000 3 (Base Construction Allocation - 4 $1,075,000) 5 (Land Allocation - $75,000) 6 (Design and Contingencies - $250,000) 7 (27) SR 1045, Bridge over Branch of 8 Dickerson Run, Vanderbilt Borough, 9 Bridge Replacement 330,000 10 (Base Construction Allocation - 11 $225,000) 12 (Land Allocation - $5,000) 13 (Design and Contingencies - $100,000 14 (28) SR 0201, Bridge over Virgin Run, 15 Franklin Township, Bridge Replacement 330,000 16 (Base Construction Allocation - 17 $225,000) 18 (Land Allocation - $5,000) 19 (Design and Contingencies - $100,000 20 (29) SR 4016, Bridge over Redstone Creek, 21 Redstone Township, Bridge Replacement 1,030,000 22 (Base Construction Allocation - 23 $830,000) 24 (Land Allocation - $$25,000) 25 (Design and Contingencies - $175,000) 26 (30) SR 1021, Bridge over Breakneck Run, 27 Bullskin Township, Bridge Replacement 505,000 28 (Base Construction Allocation - 29 $325,000) 30 (Land Allocation - $5,000) 19990S0504B1019 - 301 -
1 (Design and Contingencies - $175,000) 2 (31) SR 1031, Bridge over Branch of Galley 3 Run, Upper Tyrone Township, Bridge 4 Replacement 465,000 5 (Base Construction Allocation - 6 $300,000 7 (Land Allocation - $15,000) 8 (Design and Contingencies - $150,000) 9 (32) SR 3003, Bridge over Georges Creek, 10 Springhill/Nicholson Township, Bridge 11 Replacement 785,000 12 (Base Construction Allocation - 13 $600,000) 14 (Land Allocation - $10,000) 15 (Design and Contingencies - $175,000) 16 (33) SR 3003, Bridge over Georges Creek, 17 Springhill/Nicholson Township, Bridge 18 Replacement 885,000 19 (Base Construction Allocation - 20 $700,000) 21 (Land Allocation - $10,000) 22 (Design and Contingencies -$175,000) 23 (34) SR 4027, Bridge over Little Redstone 24 Creek, Jefferson Township, Bridge 25 Replacement 355,000 26 (Base Construction Allocation - 27 $250,000) 28 (Land Allocation - $5,000) 29 (Design and Contingencies - $100,000) 30 (35) SR 3007, Bridge over Georges Creek, 19990S0504B1019 - 302 -
1 Georges Township, Bridge Replacement 700,000 2 (Base Construction Allocation - 3 $500,000) 4 (Land Allocation - $25,000) 5 (Design and Contingencies - $175,000) 6 (36) SR 0031, Jacobs Creek Bridge over 7 Jacobs Creek, Bullskin Township, 8 Fayette County, and Mt. Pleasant 9 Township, Westmoreland County, Bridge 10 Replacement 715,000 11 (Base Construction Allocation - 12 $500,000) 13 (Land Allocation - $40,000) 14 (Design and Contingencies - $175,000) 15 (37) SR 1037, ARCH STREET BRIDGE, CITY OF <-- 16 CONNELLSVILLE, BRIDGE REPLACEMENT 840,000 17 (BASE CONSTRUCTION ALLOCATION - 18 $557,000) 19 (LAND ALLOCATION - $35,000) 20 (DESIGN AND CONTINGENCIES - $248,000) 21 (38) SR 0021, MASONTOWN BRIDGE OVER 22 MONONGAHELA RIVER, GERMAN TOWNSHIP, 23 FAYETTE COUNTY, MONONGAHELA TOWNSHIP 24 AND GREENE COUNTY, BRIDGE REPLACEMENT 36,000,000 25 (BASE CONSTRUCTION ALLOCATION - 26 $31,000,000) 27 (LAND ALLOCATION - $2,500,000) 28 (DESIGN AND CONTINGENCIES - $2,500,000) 29 Section 31. Forest County. 30 (a) Local Bridges (Reserved) 19990S0504B1019 - 303 -
1 (b) State Bridges 2 (1) SR 0227, SR 0227 over West Hickory 3 Creek, Harmony Township, Bridge 4 Replacement 480,000 5 (Base Construction Allocation - 6 $400,000) 7 (Land Allocation - $20,000) 8 (Design and Contingencies - $60,000) 9 (2) SR 3001, SR 3001 over Little Tionesta 10 Creek, Tionesta Township, Bridge 11 Replacement 400,000 12 (Base Construction Allocation - 13 $310,000) 14 (Land Allocation - $10,000) 15 (Design and Contingencies - $80,000) 16 (3) SR 3004, SR 3004 over Little Hickory 17 Creek, Hickory Township, Bridge 18 Replacement 390,000 19 (Base Construction Allocation - 20 $300,000) 21 (Land Allocation - $30,000) 22 (Design and Contingencies - $60,000) 23 (4) SR 3004, SR 3004 over Piney Run, Green 24 Township, Bridge Replacement 390,000 25 (Base Construction Allocation - 26 $300,000) 27 (Land Allocation - $10,000) 28 (Design and Contingencies - $80,000) 29 (5) SR 3001, Red Brush Road Bridge over 30 Little Tionesta Creek, Tionesta 19990S0504B1019 - 304 -
1 Township, Bridge Rehabilitation 605,000 2 (Base Construction Allocation - 3 $550,000) 4 (Design and Contingencies - $55,000) 5 (6) SR 1003, Bridge over Blue Jay Creek, 6 Howe Township, Bridge Rehabilitation 340,000 7 (Base Construction Allocation - 8 $250,000) 9 (Land Allocation - $30,000) 10 (Design and Contingencies - $60,000) 11 (7) SR 1003, BRIDGE OVER SLATER RUN, HOWE <-- 12 TOWNSHIP, BRIDGE REHABILITATION 400,000 13 (BASE CONSTRUCTION ALLOCATION - 14 $320,000) 15 (LAND ALLOCATION - $20,000) 16 (DESIGN AND CONTINGENCIES - $60,000) 17 (8) SR 1003, BRIDGE NO.2 OVER BLUE JAY 18 CREEK, HOWE TOWNSHIP, BRIDGE 19 REHABILITATION 600,000 20 (BASE CONSTRUCTION ALLOCATION - 21 $500,000) 22 (LAND ALLOCATION - $20,000) 23 (DESIGN AND CONTINGENCIES - $80,000) 24 (9) SR 2005, BRIDGE OVER MILLSTONE CREEK, 25 JENKS TOWNSHIP, BRIDGE REPLACEMENT 200,000 26 (BASE CONSTRUCTION ALLOCATION - 27 $100,000) 28 (LAND ALLOCATION - $20,000) 29 (DESIGN AND CONTINGENCIES - $80,000) 30 Section 32. Franklin County. 19990S0504B1019 - 305 -
1 (a) Local Bridges (Reserved) 2 (b) State Bridges 3 (1) SR 3012, Social Island Road Bridge 4 over Conococheague Creek, Hamilton 5 Township, Bridge Replacement 786,000 6 (Base Construction Allocation - 7 $636,000) 8 (Land Allocation - $95,000) 9 (Design and Contingencies - $55,000) 10 (2) SR 4010, Edenville Road Bridge over 11 Wilson Run, St. Thomas Township, Bridge 12 Replacement 335,000 13 (Base Construction Allocation - 14 $225,000) 15 (Land Allocation - $10,000) 16 (Design and Contingencies - $100,000) 17 (3) SR 4009, over Wilson Run, St. Thomas 18 Township, Bridge Replacement 750,000 19 (Base Construction Allocation - 20 $500,000) 21 (Land Allocation - $50,000) 22 (Design and Contingencies - $200,000) 23 (4) SR 4007, Tuscarora Creek Bridge over 24 Tuscarora Creek, Fannett Township, 25 Bridge Replacement 1,500,000 26 (Base Construction Allocation - 27 $1,000,000) 28 (Land Allocation - $100,000) 29 (Design and Contingencies - $400,000) 30 (5) PA 274, BRIDGE OVER BRANCH OF <-- 19990S0504B1019 - 306 -
1 TUSCARORA CREEK, FANNETT TOWNSHIP, 2 BRIDGE REPLACEMENT 523,000 3 (BASE CONSTRUCTION ALLOCATION - 4 $387,000) 5 (LAND ALLOCATION - $39,000) 6 (DESIGN AND CONTINGENCIES - $97,000) 7 (6) SR 4006, BRIDGE OVER WEST BRANCH OF 8 CONOCOCHEAGUE CREEK, METAL TOWNSHIP, 9 BRIDGE REPLACEMENT 727,000 10 (BASE CONSTRUCTION ALLOCATION - 11 $538,000) 12 (LAND ALLOCATION - $54,000) 13 (DESIGN AND CONTINGENCIES - $135,000) 14 (7) SR 4018, BRIDGE OVER TRIBUTARY OF 15 CONODOQUINET CREEK, LURGAN TOWNSHIP, 16 BRIDGE REPLACEMENT 473,000 17 (BASE CONSTRUCTION ALLOCATION - 18 $350,000) 19 (LAND ALLOCATION - $35,000) 20 (DESIGN AND CONTINGENCIES - $88,000) 21 (8) SR 4018, BRIDGE OVER CONODOQUINET 22 CREEK, SOUTHAMPTON TOWNSHIP, BRIDGE 23 REPLACEMENT 913,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $689,000) 26 (LAND ALLOCATION - $67,000) 27 (DESIGN AND CONTINGENCIES - $157,000) 28 (9) SR 2016, BRIDGE OVER I-81, ANTRIM 29 TOWNSHIP, BRIDGE REHABILITATION 891,000 30 (BASE CONSTRUCTION ALLOCATION - 19990S0504B1019 - 307 -
1 $691,000) 2 (DESIGN AND CONTINGENCIES - $200,000) 3 (10) SR 0533, BRIDGE OVER WEST BRANCH OF 4 CONOCOCHEAGUE CREEK, METAL TOWNSHIP, 5 BRIDGE REHABILITATION 1,200,000 6 Section 33. Fulton County. 7 (a) Local Bridges 8 (1) Thompson Township, T-312, Bridge over 9 Licking Creek, New Bridge Construction 990,000 10 (Base Construction Allocation - 11 $800,000) 12 (Land Allocation - $15,000) 13 (Design and Contingencies - $175,000) 14 (2) Thompson Township, T-348, Bridge over 15 Licking Creek, New Bridge Construction 740,000 16 (Base Construction Allocation - 17 $575,000) 18 (Land Allocation - $25,000) 19 (Design and Contingencies - $140,000) 20 (3) Thompson Township, T-325, Bridge over 21 Tonoloway Creek, New Bridge 22 Construction 800,000 23 (Base Construction Allocation - 24 $625,000) 25 (Land Allocation - $25,000) 26 (Design and Contingencies - $150,000) 27 (4) Thompson Township, T-343, Bridge over 28 Tonoloway Creek, New Bridge 29 Construction 890,000 30 (Base Construction Allocation - 19990S0504B1019 - 308 -
1 $700,000) 2 (Land Allocation - $25,000) 3 (Design and Contingencies - $165,000) 4 (b) State Bridges 5 (1) SR 4007, Wooden Bridge over Wooden 6 Bridge Creek, Taylor Township, Bridge 7 Replacement 550,000 8 (Base Construction Allocation - 9 $405,000) 10 (Land Allocation - $25,000) 11 (Design and Contingencies - $120,000) 12 (2) SR 2005, BRIDGE OVER PLUM RUN, <-- 13 THOMPSON TOWNSHIP, BRIDGE 14 REHABILITATION 50,000 15 (BASE CONSTRUCTION ALLOCATION - 16 $36,000) 17 (LAND ALLOCATION - $1,000) 18 (DESIGN AND CONTINGENCIES - $13,000) 19 (3) SR 4010, BRIDGE OVER ROARING RUN, 20 WELLS TOWNSHIP, BRIDGE REHABILITATION 88,000 21 (BASE CONSTRUCTION ALLOCATION - 22 $72,000) 23 (LAND ALLOCATION - $2,000) 24 (DESIGN AND CONTINGENCIES - $14,000) 25 Section 34. Greene County. 26 (a) Local Bridges 27 (1) Morgan Township, County Bridge No.89 28 over Browns Run, Bridge Replacement 286,000 29 (Base Construction Allocation - 30 $166,000) 19990S0504B1019 - 309 -
1 (Land Allocation - $20,000) 2 (Design and Contingencies - $100,000) 3 (2) Morgan Township, County Bridge No.90 4 over Browns Run, Bridge Replacement 282,000 5 (Base Construction Allocation - 6 $162,000) 7 (Land Allocation - $20,000) 8 (Design and Contingencies - $100,000) 9 (3) Morgan Township, County Bridge No.91 10 over Browns Run, Bridge Replacement 273,000 11 (Base Construction Allocation - 12 $153,000) 13 (Land Allocation - $20,000) 14 (Design and Contingencies - $100,000) 15 (4) Cumberland Township, T-517, County 16 Bridge No.4, Ullery Road over Goose 17 Run, Bridge Replacement 360,000 18 (Base Construction Allocation - 19 $200,000) 20 (Land Allocation - $10,000) 21 (Design and Contingencies - $150,000) 22 (5) Cumberland Township, T-634, County 23 Bridge No.15, Coal Hill Road over Muddy 24 Creek, Bridge Replacement 410,000 25 (Base Construction Allocation - 26 $240,000) 27 (Land Allocation - $10,000) 28 (Design and Contingencies - $160,000) 29 (6) Greene Township, T-411, County Bridge 30 No.20 over Whitely Creek, Bridge 19990S0504B1019 - 310 -
1 Replacement 1,075,000 2 (Base Construction Allocation - 3 $900,000) 4 (Land Allocation - $25,000) 5 (Design and Contingencies - $150,000) 6 (7) Gray Township, T-392, County Bridge 7 No.63 over Grays Creek, Bridge 8 Replacement 380,000 9 (Base Construction Allocation - 10 $220,000) 11 (Land Allocation - $10,000) 12 (Design and Contingencies - $150,000) 13 (8) Washington Township, T-550, County 14 Bridge No.97 over Craynes Run, Bridge 15 Replacement 360,000 16 (Base Construction Allocation - 17 $200,000) 18 (Land Allocation - $10,000) 19 (Design and Contingencies - $150,000) 20 (9) Morris Township, T-629, County Bridge 21 No.73 over Bates Fork Creek, Bridge 22 Replacement 490,000 23 (Base Construction Allocation - 24 $350,000) 25 (Land Allocation - $15,000) 26 (Design and Contingencies - $125,000) 27 (10) Cumberland Township, T-660, County 28 Bridge No.13 over Muddy Creek, Bridge 29 Replacement 565,000 30 (Base Construction Allocation - 19990S0504B1019 - 311 -
1 $400,000) 2 (Land Allocation - 15,000) 3 (Design and Contingencies - $150,000) 4 (11) Aleppo Township, T-304, County Bridge 5 No.108 over Branch of Harts Run, Bridge 6 Replacement 575,000 7 (Base Construction Allocation - 8 $425,000) 9 (Land Allocation - $25,000) 10 (Design and Contingencies - $125,000) 11 (12) Franklin Township, T-511, Bridge 12 No.30 over Smith Creek, Bridge 13 Replacement 625,000 14 (Base Construction Allocation - 15 $475,000) 16 (Land Allocation - $25,000) 17 (Design and Contingencies - $125,000) 18 (13) Morgan Township, T-659, Bridge No.87 19 over Ten Mile Creek, Bridge 20 Replacement 1,275,000 21 (Base Construction Allocation - 22 $1,100,000) 23 (Land Allocation - $25,000) 24 (Design and Contingencies - $150,000) 25 (14) Richhill Township, T-356, Bridge 26 No.57 over North Fork of Wheeling 27 Creek, Bridge Replacement 765,000 28 (Base Construction Allocation - 29 $625,000) 30 (Land Allocation - $15,000) 19990S0504B1019 - 312 -
1 (Design and Contingencies - $125,000) 2 (15) Jackson Township, T-381, Bridge 3 No.109 over Job Creek, Bridge 4 Replacement 465,000 5 (Base Construction Allocation - 6 $325,000) 7 (Land Allocation - $15,000) 8 (Design and Contingencies - $125,000) 9 (b) State Bridges 10 (1) SR 0018, Bridge over South Fork of Ten 11 Mile Creek, Franklin Township, Bridge 12 Rehabilitation 320,000 13 (Base Construction Allocation - 14 $280,000) 15 (Design and Contingencies - $40,000) 16 (2) SR 0018, Bates Creek Bridge over Bates 17 Fork and Browns Creeks, Washington 18 Township, Bridge Replacement 650,000 19 (Base Construction Allocation - 20 $450,000) 21 (Land Allocation - $25,000) 22 (Design and Contingencies - $175,000) 23 (3) SR 0021, Grinnage Run Bridge over 24 Grinnage Run, Gray Township, Bridge 25 Replacement 453,000 26 (Base Construction Allocation - 27 $253,000) 28 (Land Allocation - $25,000) 29 (Design and Contingencies - $175,000) 30 (4) SR 0079, I-79 Bridge over T-631, 19990S0504B1019 - 313 -
1 Washington Township, Bridge 2 Replacement 980,000 3 (Base Construction Allocation - 4 $740,000) 5 (Land Allocation - $40,000) 6 (Design and Contingencies - $200,000) 7 (5) SR 0079, I-79 Bridge over T-631, 8 Washington Township, Bridge 9 Rehabilitation 945,000 10 (Base Construction Allocation - 11 $705,000) 12 (Land Allocation - $40,000) 13 (Design and Contingencies - $200,000) 14 (6) SR 0079, I-79 Bridge over PA 221, 15 Washington Township, Bridge 16 Replacement 2,074,000 17 (Base Construction Allocation - 18 $1,784,000) 19 (Land Allocation - $40,000) 20 (Design and Contingencies - $250,000) 21 (7) SR 0079, I-79 Bridge No.2 over PA 221, 22 Washington Township, Bridge 23 Replacement 2,074,000 24 (Base Construction Allocation - 25 $1,784,000) 26 (Land Allocation - $40,000) 27 (Design and Contingencies - $250,000) 28 (8) SR 0079, I-79 Bridge over T-512, 29 Washington Township, Bridge 30 Rehabilitation 980,000 19990S0504B1019 - 314 -
1 (Base Construction Allocation - 2 $740,000) 3 (Land Allocation - $40,000) 4 (Design and Contingencies - $200,000) 5 (9) SR 0079, I-79 Bridge No.2 over T-512, 6 Washington Township, Bridge 7 Replacement 1,020,000 8 (Base Construction Allocation - 9 $780,000) 10 (Land Allocation - $40,000) 11 (Design and Contingencies - $200,000) 12 (10) SR 0088, Albert Gallatin Bridge over 13 Monongahela River, Dunkard Township, 14 Bridge Painting 1,500,000 15 (Base Construction Allocation - 16 $1,500,000) 17 (11) SR 0088, Point Marion Bridge over 18 Monongahela River, Dunkard Township, 19 Bridge Replacement 6,200,000 20 (Base Construction Allocation - 21 $5,500,000) 22 (Land Allocation - $200,000) 23 (Design and Contingencies - $500,000) 24 (12) SR 0218, Roberts Run Bridge No.2 over 25 Roberts Run, Wayne Township, Bridge 26 Replacement 768,000 27 (Base Construction Allocation - 28 $568,000) 29 (Land Allocation - $25,000) 30 (Design and Contingencies - $175,000) 19990S0504B1019 - 315 -
1 (13) SR 2003, Bridge over Branch of 2 Dunkard Creek, Perry Township, Bridge 3 Replacement 625,000 4 (Base Construction Allocation - 5 $400,000) 6 (Land Allocation - $25,000) 7 (Design and Contingencies - $200,000) 8 (14) SR 3007, Bridge over Branch of 9 Wheeling Creek, Richill Township, 10 Bridge Replacement 375,000 11 (Base Construction Allocation - 12 $175,000) 13 (Land Allocation - $25,000) 14 (Design and Contingencies - $175,000) 15 (15) SR 3006, Dunkard Bridge over Branch 16 of Dunkard Creek, Gilmore Township, 17 Bridge Replacement 99,000 18 (Base Construction Allocation - 19 $80,000) 20 (Land Allocation - $11,000) 21 (Design and Contingencies - $8,000) 22 (16) SR 3017, Bridge over Fork of Fish 23 Creek, Freeport Township, Bridge 24 Replacement 1,500,000 25 (Base Construction Allocation - 26 $1,000,000) 27 (Land Allocation - $100,000) 28 (Design and Contingencies - $400,000) 29 Section 35. Huntingdon County. 30 (a) Local Bridges 19990S0504B1019 - 316 -
1 (1) Mill Creek Borough, Main Street Bridge 2 over Mill Creek, Bridge Rehabilitation 30,000 3 (Base Construction Allocation - 4 $30,000) 5 (2) Juniata Township, T-428, Corbin Bridge 6 over Raystown Branch of Juniata River, 7 Bridge Replacement 920,000 8 (Base Construction Allocation - 9 $920,000) 10 (3) Springfield Township, T-313, Walnut 11 Grove Bridge, County Bridge No.2 over 12 Sideling Hill Creek, Bridge 13 Replacement 975,000 14 (Base Construction Allocation - 15 $800,000) 16 (Land Allocation - $25,000) 17 (Design and Contingencies - $150,000) 18 (4) Jackson Township, T-525, Bridge over 19 Stone Creek, Bridge Rehabilitation 470,000 20 (Base Construction Allocation - 21 $350,000) 22 (Design and Contingencies - $120,000) 23 (5) Jackson Township, T-534, Bridge over 24 Greenlee Run, Bridge Rehabilitation 250,000 25 (Base Construction Allocation - 26 $170,000) 27 (Design and Contingencies - $80,000) 28 (6) Jackson Township, T-529, Bridge over 29 Stone Creek, Bridge Replacement 469,000 30 (Base Construction Allocation - 19990S0504B1019 - 317 -
1 $355,000) 2 (Design and Contingencies - $114,000) 3 (7) Jackson Township, T-534, Bridge over 4 Greenlee Run, Bridge Replacement 246,000 5 (Base Construction Allocation - 6 $169,000) 7 (Design and Contingencies - $77,000) 8 (8) Jackson Township, T-534, Eckley Road 9 Bridge over Croyle Run, Bridge 10 Replacement 255,000 11 (Base Construction Allocation - 12 $195,000) 13 (Land Allocation - $10,000) 14 (Design and Contingencies - $50,000) 15 (9) SHIRLEY TOWNSHIP, T-373, BRIDGE OVER <-- 16 AUGHWICK CREEK, BRIDGE REPLACEMENT 500,000 17 (BASE CONSTRUCTION ALLOCATION - 18 $300,000) 19 (LAND ALLOCATION - $10,000) 20 (DESIGN AND CONTINGENCIES - $190,000) 21 (10) SPRINGFIELD TOWNSHIP, T-308, BRIDGE 22 OVER LICK RUN, BRIDGE REPLACEMENT 475,000 23 (BASE CONSTRUCTION ALLOCATION - 24 $350,000) 25 (LAND ALLOCATION - $5,000) 26 (DESIGN AND CONTINGENCIES - $120,000) 27 (11) SPRINGFIELD TOWNSHIP, T-330, BRIDGE 28 OVER ELLIOT RUN, BRIDGE REPLACEMENT 425,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $300,000) 19990S0504B1019 - 318 -
1 (LAND ALLOCATION - $5,000) 2 (DESIGN AND CONTINGENCIES - $120,000) 3 (12) SPRINGFIELD TOWNSHIP, T-332, BRIDGE 4 OVER ELLIOT RUN, BRIDGE REPLACEMENT 425,000 5 (BASE CONSTRUCTION ALLOCATION - 6 $300,000) 7 (LAND ALLOCATION - $5,000) 8 (DESIGN AND CONTINGENCIES - $120,000) 9 (13) TODD TOWNSHIP, T-370, BRIDGE OVER 10 GREAT TROUGH CREEK, BRIDGE REPLACEMENT 565,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $450,000) 13 (LAND ALLOCATION - $15,000) 14 (DESIGN AND CONTINGENCIES - $100,000) 15 (14) TODD TOWNSHIP, T-368, BRIDGE OVER 16 GREAT TROUGH CREEK, BRIDGE REPLACEMENT 400,000 17 (BASE CONSTRUCTION ALLOCATION - 18 $300,000) 19 (LAND ALLOCATION - $10,000) 20 (DESIGN AND CONTINGENCIES - $90,000) 21 (15) SPRINGFIELD TOWNSHIP, T-330, BRIDGE 22 OVER ELLIOT RUN, BRIDGE REPLACEMENT 425,000 23 (BASE CONSTRUCTION ALLOCATION - 24 $300,000) 25 (LAND ALLOCATION - $5,000) 26 (DESIGN AND CONTINGENCIES - $120,000) 27 (16) SPRINGFIELD TOWNSHIP, T-308, BRIDGE 28 OVER LICK RUN, BRIDGE REPLACEMENT 475,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $350,000) 19990S0504B1019 - 319 -
1 (LAND ALLOCATION - $5,000) 2 (DESIGN AND CONTINGENCIES - $120,000) 3 (17) SPRINGFIELD TOWNSHIP, T-332, BRIDGE 4 OVER ELLIOT RUN, BRIDGE REPLACEMENT 425,000 5 (BASE CONSTRUCTION ALLOCATION - 6 $300,000) 7 (LAND ALLOCATION - $5,000) 8 (DESIGN AND CONTINGENCIES - $120,000) 9 (b) State Bridges 10 (1) SR 0522, Aughwick Bridge over Aughwick 11 Creek, East Broad Top Railroad and T- 12 396, Shirley Township, Bridge 13 Replacement 825,000 14 (Base Construction Allocation - 15 $750,000) 16 (Design and Contingencies - $75,000) 17 (2) SR 1011, Murrays Run Bridge over 18 Murrays Run, Oneida Township, Bridge 19 Replacement 615,000 20 (Base Construction Allocation - 21 $420,000) 22 (Land Allocation - $75,000) 23 (Design and Contingencies - $120,000) 24 (3) SR 2011, Narrows Creek Bridge over 25 Narrows Creek, Tell Township, Bridge 26 Replacement 785,000 27 (Base Construction Allocation - 28 $590,000) 29 (Land Allocation - $50,000) 30 (Design and Contingencies - $145,000) 19990S0504B1019 - 320 -
1 (4) SR 1005, Mill Creek Bridge over Mill 2 Creek, Brady Township, Bridge 3 Replacement 815,000 4 (Base Construction Allocation - 5 $625,000) 6 (Land Allocation - $40,000) 7 (Design and Contingencies - $150,000) 8 (5) SR 2019, Licking Creek Bridge over 9 Licking Creek, Shirley Township, Bridge 10 Replacement 505,000 11 (Base Construction Allocation - 12 $365,000) 13 (Land Allocation - $25,000) 14 (Design and Contingencies - $115,000) 15 (6) SR 0305, BRIDGE OVER TRIBUTARY OF <-- 16 STANDING STONE CREEK, JACKSON TOWNSHIP, 17 BRIDGE REHABILITATION 50,000 18 (BASE CONSTRUCTION ALLOCATION - 19 $36,000) 20 (LAND ALLOCATION - $1,000) 21 (DESIGN AND CONTINGENCIES - $13,000) 22 (7) SR 0522, BRIDGE OVER TRIBUTARY OF 23 NORTH BRANCH OF LITTLE AUGHWICK CREEK, 24 DUBLIN TOWNSHIP, BRIDGE REHABILITATION 75,000 25 (BASE CONSTRUCTION ALLOCATION - 26 $56,000) 27 (LAND ALLOCATION - $1,000) 28 (DESIGN AND CONTINGENCIES - $18,000) 29 (8) SR 0655, BRIDGE OVER TRIBUTARY OF 30 HARES VALLEY CREEK, CASS TOWNSHIP, 19990S0504B1019 - 321 -
1 BRIDGE REHABILITATION 50,000 2 (BASE CONSTRUCTION ALLOCATION - 3 $36,000) 4 (LAND ALLOCATION - $1,000) 5 (DESIGN AND CONTINGENCIES - $13,000) 6 (9) SR 0747, BRIDGE OVER TRIBUTARY OF 7 THREE SPRINGS CREEK, CROMWELL TOWNSHIP, 8 BRIDGE REHABILITATION 50,000 9 (BASE CONSTRUCTION ALLOCATION - 10 $36,000) 11 (LAND ALLOCATION - $1,000) 12 (DESIGN AND CONTINGENCIES - $13,000) 13 (10) SR 0747, BRIDGE OVER OLD WOMENS RUN, 14 CROMWELL TOWNSHIP, BRIDGE 15 REHABILITATION 45,000 16 (BASE CONSTRUCTION ALLOCATION - 17 $33,000) 18 (LAND ALLOCATION - $1,000) 19 (DESIGN AND CONTINGENCIES - $11,000) 20 (11) SR 0747, BRIDGE OVER SUGAR RUN, 21 CROMWELL TOWNSHIP, BRIDGE 22 REHABILITATION 45,000 23 (BASE CONSTRUCTION ALLOCATION - 24 $33,000) 25 (LAND ALLOCATION - $1,000) 26 (DESIGN AND CONTINGENCIES - $11,000) 27 (12) SR 0994, BRIDGE OVER HAW RUN, TODD 28 TOWNSHIP, BRIDGE REHABILITATION 45,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $33,000) 19990S0504B1019 - 322 -
1 (LAND ALLOCATION - $1,000) 2 (DESIGN AND CONTINGENCIES - $11,000) 3 (13) SR 1005, BRIDGE OVER TRIBUTARY OF 4 MILL CREEK, BRADY TOWNSHIP, BRIDGE 5 REHABILITATION 55,000 6 (BASE CONSTRUCTION ALLOCATION - 7 $40,000) 8 (LAND ALLOCATION - $1,000) 9 (DESIGN AND CONTINGENCIES - $14,000) 10 (14) SR 2005, BRIDGE OVER ELLIOT RUN, CLAY 11 TOWNSHIP, BRIDGE REHABILITATION 52,000 12 (BASE CONSTRUCTION ALLOCATION - 13 $38,000) 14 (LAND ALLOCATION - $1,000) 15 (DESIGN AND CONTINGENCIES - $13,000) 16 (15) SR 2007, BRIDGE OVER LITTLE AUGHWICK 17 CREEK, DUBLIN TOWNSHIP, BRIDGE 18 REHABILITATION 152,000 19 (BASE CONSTRUCTION ALLOCATION - 20 $125,000) 21 (LAND ALLOCATION - $2,000) 22 (DESIGN AND CONTINGENCIES - $25,000) 23 Section 36. Indiana County. 24 (a) Local Bridges 25 (1) Banks Township, T-974, County Bridge 26 No.13, Bear Run Bridge over Bear Run, 27 Bridge Replacement 500,000 28 (Base Construction Allocation - 29 $400,000) 30 (Land Allocation - $20,000) 19990S0504B1019 - 323 -
1 (Design and Contingencies - $80,000) 2 (2) Blacklick Township, T-574, Muddy Run 3 Bridge over Muddy Run, Bridge 4 Replacement 380,000 5 (Base Construction Allocation - 6 $300,000) 7 (Land Allocation - $10,000) 8 (Design and Contingencies - $70,000) 9 (3) Cherryhill Township, T-686, County 10 Bridge No.65, Grace Church Bridge over 11 Two Lick Creek, Bridge Replacement 600,000 12 (Base Construction Allocation - 13 $500,000) 14 (Land Allocation - $20,000) 15 (Design and Contingencies - $80,000) 16 (4) Cherryhill Township, T-978, Allen 17 Bridge over Two Lick Reservoir, Bridge 18 Rehabilitation 264,000 19 (Base Construction Allocation - 20 $200,000) 21 (Land Allocation - $10,000) 22 (Design and Contingencies - $54,000) 23 (5) Rayne Township, T-760, County Bridge 24 No.23-A, Chambersville Bridge over 25 Crooked Creek, Bridge Rehabilitation 190,000 26 (Base Construction Allocation - 27 $150,000) 28 (Land Allocation - $10,000) 29 (Design and Contingencies - $30,000) 30 (6) Grant Township, T-820 over Crooked 19990S0504B1019 - 324 -
1 Run, Bridge Replacement 245,000 2 (Base Construction Allocation - 3 $200,000) 4 (Land Allocation - $10,000) 5 (Design and Contingencies - $35,000) 6 (b) State Bridges 7 (1) SR 0022, Chestnut Ridge Bridge over SR 8 0119, Burrell Township, Bridge 9 Painting 90,000 10 (Base Construction Allocation - 11 $75,000) 12 (Design and Contingencies - $15,000) 13 (2) SR 0022, Armagh Bridge over SR 0056, 14 West Wheatfield Township, Bridge 15 Painting 145,000 16 (Base Construction Allocation - 17 $130,000) 18 (Design and Contingencies - $15,000) 19 (3) SR 0119, Blacklick Bridge over 20 Blacklick Creek, Burrell Township, 21 Bridge Painting 280,000 22 (Base Construction Allocation - 23 $265,000) 24 (Design and Contingencies - $15,000) 25 (4) SR 0119, Bypass Steel Bridge No.1 over 26 Wayne Avenue Ramps, White Township, 27 Bridge Painting 170,000 28 (Base Construction Allocation - 29 $155,000) 30 (Design and Contingencies - $15,000) 19990S0504B1019 - 325 -
1 (5) SR 0119, Bypass Steel Bridge No.2 over 2 Wayne Avenue Ramps, White Township, 3 Bridge Painting 170,000 4 (Base Construction Allocation - 5 $155,000) 6 (Design and Contingencies - $15,000) 7 (6) SR 0119, Bypass Steel Bridge No.3 over 8 SR 0422, White Township, Bridge 9 Painting 240,000 10 (Base Construction Allocation - 11 $225,000) 12 (Design and Contingencies - $15,000) 13 (7) SR 0119, Bypass Steel Bridge No.4 over 14 SR 0422, White Township, Bridge 15 Painting 240,000 16 (Base Construction Allocation - 17 $225,000) 18 (Design and Contingencies - $15,000) 19 (8) SR 0119, Bypass Steel Bridge No.5 over 20 SR 0954, White Township, Bridge 21 Painting 195,000 22 (Base Construction Allocation - 23 $180,000) 24 (Design and Contingencies - $15,000) 25 (9) SR 0119, Bypass Steel Bridge No.6 over 26 SR 0954, White Township, Bridge 27 Painting 175,000 28 (Base Construction Allocation - 29 $160,000) 30 (Design and Contingencies - $15,000) 19990S0504B1019 - 326 -
1 (10) SR 0119, Bypass Steel Bridge No.7 2 over SR 0286, White Township, Bridge 3 Painting 235,000 4 (Base Construction Allocation - 5 $220,000) 6 (Design and Contingencies - $15,000) 7 (11) SR 0119, Bypass Steel Bridge No.8 8 over SR 0286, White Township, Bridge 9 Painting 215,000 10 (Base Construction Allocation - 11 $200,000) 12 (Design and Contingencies - $15,000) 13 (12) SR 0119, Bypass Steel Bridge No.9 14 over SR 1003, White Township, Bridge 15 Painting 200,000 16 (Base Construction Allocation - 17 $185,000) 18 (Design and Contingencies - $15,000) 19 (13) SR 0119, Bypass Steel Bridge No.10 20 over SR 1003, White Township, Bridge 21 Painting 175,000 22 (Base Construction Allocation - 23 $160,000) 24 (Design and Contingencies - $15,000) 25 (14) SR 0119, Bypass Steel Bridge No.11 26 over SR 0110, White Township, Bridge 27 Painting 125,000 28 (Base Construction Allocation - 29 $110,000) 30 (Design and Contingencies - $15,000) 19990S0504B1019 - 327 -
1 (15) SR 0119, Bypass Steel Bridge No.12 2 over SR 0110, White Township, Bridge 3 Painting 125,000 4 (Base Construction Allocation - 5 $110,000) 6 (Design and Contingencies - $15,000) 7 (16) SR 0217, Torrance Bridge over 8 Conemaugh River, Burrell Township, 9 Bridge Painting 435,000 10 (Base Construction Allocation - 11 $420,000) 12 (Design and Contingencies - $15,000) 13 (17) SR 0217, Blacklick Creek Bridge over 14 Blacklick Creek, Burrell Township, 15 Bridge Painting 400,000 16 (Base Construction Allocation - 17 $385,000) 18 (Design and Contingencies - $15,000) 19 (18) SR 0259, Heshbon Bridge over 20 Blacklick Creek, West Wheatfield 21 Township, Bridge Painting 200,000 22 (Base Construction Allocation - 23 $185,000) 24 (Design and Contingencies - $15,000) 25 (19) SR 0286, Clymer Bridge over Twolick 26 Creek, Clymer Borough, Bridge Painting 175,000 27 (Base Construction Allocation - 28 $160,000) 29 (Design and Contingencies - $15,000) 30 (20) SR 0422, Twolick Eastbound Bridge 19990S0504B1019 - 328 -
1 over Twolick Creek, White Township, 2 Bridge Painting 360,000 3 (Base Construction Allocation - 4 $345,000) 5 (Design and Contingencies - $15,000) 6 (21) SR 0422, Twolick Westbound Bridge 7 over Twolick Creek, White Township, 8 Bridge Painting 360,000 9 (Base Construction Allocation - 10 $345,000) 11 (Design and Contingencies - $15,000) 12 (22) SR 0422, Penn Run Exit Bridge 13 Eastbound over TR 840, White Township, 14 Bridge Painting 190,000 15 (Base Construction Allocation - 16 $175,000) 17 (Design and Contingencies - $15,000) 18 (23) SR 0422, Penn Run Exit Bridge 19 Westbound over TR 840, White Township, 20 Bridge Painting 190,000 21 (Base Construction Allocation - 22 $175,000) 23 (Design and Contingencies - $15,000) 24 (24) SR 0580, Cush Cushion Creek Bridge 25 over Cush Cushion Creek, Green 26 Township, Bridge Painting 85,000 27 (Base Construction Allocation - 28 $70,000) 29 (Design and Contingencies - $15,000) 30 (25) SR 0954, Yellow Creek Bridge over 19990S0504B1019 - 329 -
1 Yellow Creek, White Township, Bridge 2 Painting 125,000 3 (Base Construction Allocation - 4 $110,000) 5 (Design and Contingencies - $15,000) 6 (26) SR 0954, Creekside Bridge over 7 Crooked Creek, White Township, Bridge 8 Painting 125,000 9 (Base Construction Allocation - 10 $110,000) 11 (Design and Contingencies - $15,000) 12 (27) SR 0954, South Branch Bridge over 13 South Branch of Plum Creek, Washington 14 Township, Bridge Painting 75,000 15 (Base Construction Allocation - 16 $60,000) 17 (Design and Contingencies - $15,000) 18 (28) SR 1004, Philadelphia Street Exit 19 Bridge over SR 0119, White Township, 20 Bridge Painting 235,000 21 (Base Construction Allocation - 22 $220,000) 23 (Design and Contingencies - $15,000) 24 (29) SR 1006, Jimmy Stewart Airport Bridge 25 over SR 0119, White Township, Bridge 26 Painting 245,000 27 (Base Construction Allocation - 28 $230,000) 29 (Design and Contingencies - $15,000) 30 (30) SR 1007, Tanoma Bridge over Crooked 19990S0504B1019 - 330 -
1 Creek, Rayne Township, Bridge Painting 75,000 2 (Base Construction Allocation - 3 $60,000) 4 (Design and Contingencies - $15,000) 5 (31) SR 1014, Diamondville Bridge over 6 North Branch of Twolick Creek, Green 7 Township, Bridge Painting 75,000 8 (Base Construction Allocation - 9 $60,000) 10 (Design and Contingencies - $15,000) 11 (32) SR 1017, Pine Flats Bridge over South 12 Branch of Twolick Creek, Green 13 Township, Bridge Painting 95,000 14 (Base Construction Allocation - 15 $80,000) 16 (Design and Contingencies - $15,000) 17 (33) SR 1033, Gypsy Bridge over Cush 18 Creek, Montgomery Township, Bridge 19 Painting 85,000 20 (Base Construction Allocation - 21 $70,000) 22 (Design and Contingencies - $15,000) 23 (34) SR 1034, Lower Wilgus Bridge over 24 Branch of Cush Creek, Montgomery 25 Township, Bridge Painting 55,000 26 (Base Construction Allocation - 27 $40,000) 28 (Design and Contingencies - $15,000) 29 (35) SR 1038, Crooked Run Bridge over 30 Crooked Run, East Mahoning Township, 19990S0504B1019 - 331 -
1 Bridge Painting 60,000 2 (Base Construction Allocation - 3 $45,000) 4 (Design and Contingencies - $15,000) 5 (36) SR 1045, Broadhead Run Bridge over 6 Broadhead Run, Canoe Township, Bridge 7 Painting 70,000 8 (Base Construction Allocation - 9 $55,000) 10 (Design and Contingencies - $15,000) 11 (37) SR 1045, Juneau Bridge over Canoe 12 Creek, Canoe Township, Bridge Painting 75,000 13 (Base Construction Allocation - 14 $60,000) 15 (Design and Contingencies - $15,000) 16 (38) SR 1046, Straight Run Bridge over 17 Straight Run, Banks Township, Bridge 18 Painting 80,000 19 (Base Construction Allocation - 20 $65,000) 21 (Design and Contingencies - $15,000) 22 (39) SR 2019, Tearing Run Bridge No.1 over 23 Tearing Run, Center Township, Bridge 24 Painting 55,000 25 (Base Construction Allocation - 26 $40,000) 27 (Design and Contingencies - $15,000) 28 (40) SR 2019, Tearing Run Bridge No.2 over 29 Tearing Run, Center Township, Bridge 30 Painting 65,000 19990S0504B1019 - 332 -
1 (Base Construction Allocation - 2 $50,000) 3 (Design and Contingencies - $15,000) 4 (41) SR 3003, Tunnelton Bridge over 5 Conemaugh River, Conemaugh Township, 6 Bridge Painting 525,000 7 (Base Construction Allocation - 8 $510,000) 9 (Design and Contingencies - $15,000) 10 (42) SR 3007, Clarksburg Bridge over 11 Blacklegs Creek, Conemaugh Township, 12 Bridge Painting 105,000 13 (Base Construction Allocation - 14 $90,000) 15 (Design and Contingencies - $15,000) 16 (43) SR 3011, Blacklick Creek Bridge No.1 17 over Blacklick Creek, Brush Valley 18 Township, Bridge Painting 405,000 19 (Base Construction Allocation - 20 $390,000) 21 (Design and Contingencies - $15,000) 22 (44) SR 3011, Blacklick Creek Bridge No.2 23 over Blacklick Creek, Blacklick 24 Township, Bridge Painting 405,000 25 (Base Construction Allocation - 26 $390,000) 27 (Design and Contingencies - $15,000) 28 (45) SR 3013, Muddy Run Bridge over Muddy 29 Run, Blacklick Township, Bridge 30 Painting 65,000 19990S0504B1019 - 333 -
1 (Base Construction Allocation - 2 $50,000) 3 (Design and Contingencies - $15,000) 4 (46) SR 3016, Homer City Bridge over 5 Twolick Creek, Homer City Borough, 6 Bridge Painting 125,000 7 (Base Construction Allocation - 8 $110,000) 9 (Design and Contingencies - $15,000) 10 (47) SR 3031, Blacklegs Run Bridge over 11 Blacklegs Run, Young Township, Bridge 12 Painting 65,000 13 (Base Construction Allocation - 14 $50,000) 15 (Design and Contingencies - $15,000) 16 (48) SR 3037, Walker Run Bridge over 17 Walker Run, Armstrong Township, Bridge 18 Painting 55,000 19 (Base Construction Allocation - 20 $40,000) 21 (Design and Contingencies - $15,000) 22 (49) SR 3039, Anthony Run Bridge over 23 Anthony Run, Armstrong Township, Bridge 24 Painting 55,000 25 (Base Construction Allocation - 26 $40,000) 27 (Design and Contingencies - $15,000) 28 (50) SR 4001, Fisher Siding Bridge over 29 Crooked Creek, Armstrong Township, 30 Bridge Painting 110,000 19990S0504B1019 - 334 -
1 (Base Construction Allocation - 2 $95,000) 3 (Design and Contingencies - $15,000) 4 (51) SR 4001, Five Points Bridge over 5 South Branch of Plum Creek, Washington 6 Township, Bridge Painting 100,000 7 (Base Construction Allocation - 8 $85,000) 9 (Design and Contingencies - $15,000) 10 (52) SR 4006, Reddings Run Bridge over 11 Reddings Run, Washington Township, 12 Bridge Painting 55,000 13 (Base Construction Allocation - 14 $40,000) 15 (Design and Contingencies - $15,000) 16 (53) SR 4008, Kimmel Station Bridge No.1 17 over Branch of Crooked Creek, Rayne 18 Township, Bridge Painting 50,000 19 (Base Construction Allocation - 20 $35,000) 21 (Design and Contingencies - $15,000) 22 (54) SR 4008, Kimmel Station Bridge No.2 23 over Branch of Crooked Creek, Rayne 24 Township, Bridge Painting 50,000 25 (Base Construction Allocation - 26 $35,000) 27 (Design and Contingencies - $15,000) 28 (55) SR 4035, Plumville Bridge over Plum 29 Creek, Plumville Borough, Bridge 30 Painting 75,000 19990S0504B1019 - 335 -
1 (Base Construction Allocation - 2 $60,000) 3 (Design and Contingencies - $15,000) 4 (56) SR 0056, Seward Conrail Overpass, 5 East Wheatfield Township, Bridge 6 Replacement 2,570,000 7 (Base Construction Allocation - 8 $2,080,000) 9 (Land Allocation - $150,000) 10 (Design and Contingencies - $340,000) 11 (57) SR 0119, Two Lick Creek Bridge over 12 Big Two Lick Creek, Center Township, 13 Bridge Rehabilitation 1,450,000 14 (Base Construction Allocation - 15 $1,000,000) 16 (Land Allocation - $100,000) 17 (Design and Contingencies - $350,000) 18 (58) SR 0119, Bridge over PA 840, Center 19 Township, Bridge Rehabilitation 1,450,000 20 (Base Construction Allocation - 21 $1,000,000) 22 (Land Allocation - $100,000) 23 (Design and Contingencies - $350,000) 24 (59) SR 0119, Yellow Creek Bridge over 25 Yellow Creek, Center Township, Bridge 26 Rehabilitation 1,450,000 27 (Base Construction Allocation - 28 $1,000,000) 29 (Land Allocation - $100,000) 30 (Design and Contingencies - $350,000) 19990S0504B1019 - 336 -
1 (60) SR 0119, Pickering Creek Bridge over 2 Pickering Creek, East Mahoning 3 Township, Bridge Rehabilitation 1,450,000 4 (Base Construction Allocation - 5 $1,000,000) 6 (Land Allocation - $100,000) 7 (Design and Contingencies - $350,000) 8 (61) SR 0119, Northbound Bridge over PA 9 110, Rayne Township, Bridge 10 Rehabilitation 1,450,000 11 (Base Construction Allocation - 12 $1,000,000) 13 (Land Allocation - $100,000) 14 (Design and Contingencies - $350,000) 15 (62) SR 0119, Southbound Bridge over PA 16 110, Payne Township, Bridge 17 Rehabilitation 1,450,000 18 (Base Construction Allocation - 19 $1,000,000) 20 (Land Allocation - $100,000) 21 (Design and Contingencies - $350,000) 22 (63) SR 0119, Pine Run Bridge No.1 over 23 Pine Run, Rayne Township, Bridge 24 Rehabilitation 1,450,000 25 (Base Construction Allocation - 26 $1,000,000) 27 (Land Allocation - $100,000) 28 (Design and Contingencies - $350,000) 29 (64) SR 0119, Pine Run Bridge No.2 over 30 Pine Run, Rayne Township, Bridge 19990S0504B1019 - 337 -
1 Rehabilitation 1,450,000 2 (Base Construction Allocation - 3 $1,000,000) 4 (Land Allocation - $100,000) 5 (Design and Contingencies - $350,000) 6 (65) SR 0119, Northbound Bridge over US 7 422, White Township, Bridge 8 Rehabilitation 1,450,000 9 (Base Construction Allocation - 10 $1,000,000) 11 (Land Allocation - $100,000) 12 (Design and Contingencies - $350,000) 13 (66) SR 0119, Southbound Bridge over US 14 422, White Township, Bridge 15 Rehabilitation 1,450,000 16 (Base Construction Allocation - 17 $1,000,000) 18 (Land Allocation - $100,000) 19 (Design and Contingencies - $350,000) 20 (67) SR 0119, Southbound Bridge over PA 21 268, White Township, Bridge 22 Rehabilitation 1,450,000 23 (Base Construction Allocation - 24 $1,000,000) 25 (Land Allocation - $100,000) 26 (Design and Contingencies - $350,000) 27 (68) SR 0119, Northbound Bridge over SR 28 0268, White Township, Bridge 29 Rehabilitation 1,450,000 30 (Base Construction Allocation - 19990S0504B1019 - 338 -
1 $1,000,000) 2 (Land Allocation - $100,000) 3 (Design and Contingencies - $350,000) 4 (69) SR 0119, Northbound Bridge over SR 5 1002, White Township, Bridge 6 Rehabilitation 1,450,000 7 (Base Construction Allocation - 8 $1,000,000) 9 (Land Allocation - $100,000) 10 (Design & Contingencies - $350,000) 11 (70) SR 0119, Southbound Bridge over SR 12 1002, White Township, Bridge 13 Rehabilitation 1450,000 14 (Base Construction Allocation - 15 $1,000,000) 16 (Land Allocation - $100,000) 17 (Design and Contingencies - $350,000) 18 (71) SR 0119, Northbound Bridge over SR 19 1113 Ramp, White Township, Bridge 20 Rehabilitation 1,450,000 21 (Base Construction Allocation - 22 $1,000,000) 23 (Land Allocation - $100,000) 24 (Design and Contingencies - $350,000) 25 (72) SR 0119, Southbound Bridge over SR 26 1113 Ramp, White Township, Bridge 27 Rehabilitation 1,450,000 28 (Base Construction Allocation - 29 $1,000,000) 30 (Land Allocation - $100,000) 19990S0504B1019 - 339 -
1 (Design and Contingencies - $350,000) 2 (73) SR 0286, Westbound Bridge over SR 3 1004, White Township, Bridge 4 Rehabilitation 1,050,000 5 (Base Construction Allocation - 6 $750,000) 7 (Land Allocation - $50,000) 8 (Design and Contingencies - $250,000) 9 (74) SR 0422, Cheese Run Bridge over 10 Cheese Run, Armstrong Township, Bridge 11 Replacement 1,450,000 12 (Base Construction Allocation - 13 $1,000,000) 14 (Land Allocation - $100,000) 15 (Design and Contingencies - $350,000) 16 (75) SR 0422, Crooked Creek Bridge over 17 Crooked Creek, Armstrong Township, 18 Bridge Rehabilitation 1,450,000 19 (Base Construction Allocation - 20 $1,000,000) 21 (Land Allocation - $100,000) 22 (Design and Contingencies - $350,000) 23 (76) SR 0422, Crooked Creek Bridge No.2 24 over Branch Crooked Creek, Armstrong 25 Township, Bridge Rehabilitation 1,450,000 26 (Base Construction Allocation - 27 $1,000,000) 28 (Land Allocation - $100,000) 29 (Design and Contingencies - $350,000) 30 (77) SR 0422, Curry Run Bridge No.1 over 19990S0504B1019 - 340 -
1 Curry Run, Armstrong Township, Bridge 2 Rehabilitation 1,450,000 3 (Base Construction Allocation - 4 $1,000,000) 5 (Land Allocation - $100,000) 6 (Design and Contingencies - $350,000) 7 (78) SR 0422, Curry Run Bridge No.2 over 8 Curry Run, Armstrong Township, Bridge 9 Rehabilitation 1,450,000 10 (Base Construction Allocation - 11 $1,000,000) 12 (Land Allocation - $100,000) 13 (Design and Contingencies - $350,000) 14 (79) SR 0422, Curry Run Bridge No.3 over 15 Curry Run, Armstrong Township, Bridge 16 Rehabilitation 1,450,000 17 (Base Construction Allocation - 18 $1,000,000) 19 (Land Allocation - $100,000) 20 (Design and Contingencies - $350,000) 21 (80) SR 0422, Curry Run Bridge No.4 over 22 Branch of Curry Run, Armstrong 23 Township, Bridge Rehabilitation 1,450,000 24 (Base Construction Allocation - 25 $1,000,000) 26 (Land Allocation - $100,000) 27 (Design and Contingencies - $350,000) 28 (81) SR 0422, Laurel Run Bridge over 29 Laurel Run, Armstrong Township, Bridge 30 Rehabilitation 1,450,000 19990S0504B1019 - 341 -
1 (Base Construction Allocation - 2 $1,000,000) 3 (Land Allocation - $100,000) 4 (Design and Contingencies - $350,000) 5 (82) SR 0422, Westbound Bridge over PA 6 840, Cherryhill Township, Bridge 7 Rehabilitation 1,450,000 8 (Base Construction Allocation - 9 $1,000,000) 10 (Land Allocation - $100,000) 11 (Design and Contingencies - $350,000) 12 (83) SR 0422, Eastbound Bridge over PA 13 840, Cherryhill Township, Bridge 14 Rehabilitation 1,450,000 15 (Base Construction Allocation - 16 $1,000,000) 17 (Land Allocation - $100,000) 18 (Design and Contingencies - $350,000) 19 (84) SR 0422, Little Yellow Creek Bridge 20 over Little Yellow Creek, Pine 21 Township, Bridge Rehabilitation 1,450,000 22 (Base Construction Allocation - 23 $1,000,000) 24 (Land Allocation - $100,000) 25 (Design and Contingencies - $350,000) 26 (85) SR 0422, Bridge over Branch of Little 27 Yellow Creek, Pine Township, Bridge 28 Rehabilitation 1,450,000 29 (Base Construction Allocation - 30 $1,000,000) 19990S0504B1019 - 342 -
1 (Land Allocation - $100,000) 2 (Design and Contingencies - $350,000) 3 (86) SR 0422, Westbound Bridge over PA 4 954, White Township, Bridge 5 Replacement 1,450,000 6 (Base Construction Allocation - 7 $1,000,000) 8 (Land Allocation - $100,000) 9 (Design and Contingencies - $350,000) 10 (87) SR 0422, Eastbound Bridge over PA 11 954, White Township, Bridge 12 Rehabilitation 1,450,000 13 (Base Construction Allocation - 14 $1,000,000) 15 (Land Allocation - $100,000) 16 (Design and Contingencies - $350,000) 17 (88) SR 1012, Diamondville Bridge over Two 18 Lick Creek, Cherryhill Township, Bridge 19 Replacement 1,250,000 20 (Base Construction Allocation - 21 $1,000,000) 22 (Land Allocation - $50,000) 23 (Design and Contingencies - $200,000) 24 (89) SR 6422, McCarthy Run Bridge over 25 Branch of McCarthy Run, White Township, 26 Bridge Rehabilitation 1,450,000 27 (Base Construction Allocation - 28 $1,000,000) 29 (Land Allocation - $100,000) 30 (Design and Contingencies - $350,000) 19990S0504B1019 - 343 -
1 (90) SR 6422, Bridge over Tributary of 2 McCarthy Run, White Township, Bridge 3 Rehabilitation 1,450,000 4 (Base Construction Allocation - 5 $1,000,000) 6 (Land Allocation - $100,000) 7 (Design and Contingencies - $350,000) 8 (91) SR 0119, STEEL RAILROAD BRIDGE NO.15 <-- 9 OVER PA 954, WHITE TOWNSHIP, BRIDGE 10 PAINTING 51,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $45,000) 13 (DESIGN AND CONTINGENCIES - $6,000) 14 (92) SR 0422, PENN RUN EXIT BRIDGE 15 EASTBOUND OVER TR 845, CHERRYHILL 16 TOWNSHIP, BRIDGE PAINTING 61,000 17 (BASE CONSTRUCTION ALLOCATION - 18 $55,000) 19 (DESIGN AND CONTINGENCIES - $6,000) 20 (93) SR 0422, PENN RUN EXIT BRIDGE 21 WESTBOUND OVER TR 845, CHERRYHILL 22 TOWNSHIP, BRIDGE PAINTING 46,000 23 (BASE CONSTRUCTION ALLOCATION - 24 $40,000) 25 (DESIGN AND CONTINGENCIES - $6,000) 26 (94) SR 1044, BRIDGE OVER BIG CANOE CREEK, 27 CANOE TOWNSHIP, BRIDGE REPLACEMENT 195,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $110,000) 30 (LAND ALLOCATION - $10,000) 19990S0504B1019 - 344 -
1 (DESIGN AND CONTINGENCIES - $75,000) 2 (95) SR 1047, BRIDGE OVER BIG CANOE CREEK, 3 CANOE TOWNSHIP, BRIDGE REPLACEMENT 205,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $120,000) 6 (LAND ALLOCATION - $10,000) 7 (DESIGN AND CONTINGENCIES - $75,000) 8 (96) SR 4006, BRIDGE OVER PLUM CREEK, 9 SOUTH MAHONING TOWNSHIP, BRIDGE 10 REPLACEMENT 205,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $120,000) 13 (LAND ALLOCATION - $10,000) 14 (DESIGN AND CONTINGENCIES - $75,000) 15 Section 37. Jefferson County. 16 (a) Local Bridges 17 (1) Summerville Borough, County Bridge 40- 18 A, Anderson Road Bridge over Runaway 19 Run, Bridge Rehabilitation 415,000 20 (Base Construction Allocation - 21 $345,000) 22 (Land Allocation - $10,000) 23 (Design and Contingencies - $60,000) 24 (2) Sykesville Borough, Station Street 25 Bridge over Stump Creek, Bridge 26 Replacement 570,000 27 (Base Construction Allocation - 28 $500,000) 29 (Land Allocation - $10,000) 30 (Design and Contingencies - $60,000) 19990S0504B1019 - 345 -
1 (3) Eldred Township, T-346 over Mill 2 Creek, Bridge Replacement 420,000 3 (Base Construction Allocation - 4 $330,000) 5 (Land Allocation - $10,000) 6 (Design and Contingencies - $80,000) 7 (4) Eldred Township, T-353 over Mill Run, 8 Bridge Replacement 245,000 9 (Base Construction Allocation - 10 $200,000) 11 (Land Allocation - $10,000) 12 (Design and Contingencies - $35,000) 13 (5) Oliver Township, T-718 over Little 14 Sandy Creek, Bridge Replacement 490,000 15 (Base Construction Allocation - 16 $400,000) 17 (Land Allocation - $10,000) 18 (Design and Contingencies - $80,000) 19 (6) Union Township, T-320 over Little Mill 20 Creek, Bridge Replacement 245,000 21 (Base Construction Allocation - 22 $200,000) 23 (Land Allocation - $10,000) 24 (Design and Contingencies - $35,000) 25 (7) Union Township, T-321 over Runaway 26 Run, Bridge Replacement 145,000 27 (Base Construction Allocation - 28 $100,000) 29 (Land Allocation - $5,000) 30 (Design and Contingencies - $40,000) 19990S0504B1019 - 346 -
1 (8) Young Township, T-632, Bridge No.JC-36 2 over Saw Mill Run, Bridge Replacement 330,000 3 (Base Construction Allocation - 4 $270,000) 5 (Design and Contingencies - $60,000) 6 (9) Oliver Township, T-380, County Bridge 7 No.22 over Hadden Run, Bridge 8 Replacement 520,000 9 (10) Henderson Township, T-519, County 10 Bridge No.7 over Big Run, Bridge 11 Replacement 595,000 12 (11) Pine Creek Township, T-464, County 13 Bridge No.17 over Little Mill Creek, 14 Bridge Replacement 480,000 15 (12) Pine Creek Township, T-452, County 16 Bridge No.16 over Little Mill Creek, 17 Bridge Replacement 360,000 18 (13) Winslow Township, T-542, County 19 Bridge No.10 over Sandy Lick Creek, 20 Bridge Replacement 925,000 21 (14) Eldred Township, T-346, Mill Creek 22 Bridge over Mill Creek, Bridge 23 Replacement 420,000 24 (Base Construction Allocation - 25 $330,000) 26 (Land Allocation - $10,000) 27 (Design and Contingencies - $80,000) 28 (15) Eldred Township, T-353, Culvert over 29 Mill Creek, Bridge Replacement 195,000 30 (Base Construction Allocation - 19990S0504B1019 - 347 -
1 $150,000) 2 (Land Allocation - $10,000) 3 (Design and Contingencies - $35,000) 4 (16) Oliver Township, T-718, Little Sandy 5 Creek Bridge over Little Sandy Creek, 6 Bridge Replacement 490,000 7 (Base Construction Allocation - 8 $400,000) 9 (Land Allocation - $10,000) 10 (Design and Contingencies - $80,000) 11 (17) Reynoldsville Borough, Point View 12 Avenue Bridge over Conrail, Bridge 13 Replacement 580,000 14 (Base Construction Allocation - 15 $500,000) 16 (Land Allocation - $10,000) 17 (Design and Contingencies - $70,000) 18 (18) Union Township and Eldred Township, 19 T-342, Mill Creek Bridge over Mill 20 Creek, Bridge Replacement 490,000 21 (Base Construction Allocation - 22 $400,000) 23 (Land Allocation - $10,000) 24 (Design and Contingencies - $80,000) 25 (19) Young Township, T-632, Culvert over 26 Saw Mill Run, Bridge Replacement 310,000 27 (Base Construction Allocation - 28 $250,000) 29 (Land Allocation - $10,000) 30 (Design and Contingencies - $50,000) 19990S0504B1019 - 348 -
1 (b) State Bridges 2 (1) SR 3033, T-830, Knox No.1 Bridge over 3 Swamp Run, Knox Township, Bridge 4 Replacement 446,000 5 (Base Construction Allocation - 6 $376,000) 7 (Land Allocation - $10,000) 8 (Design and Contingencies - $60,000) 9 (2) SR 0036, Sawmill Run Bridge over 10 Sawmill Run, Punxsutawney Borough, 11 Bridge Painting 60,000 12 (Base Construction Allocation - 13 $45,000) 14 (Design and Contingencies - $15,000) 15 (3) SR 0119, Punxsutawney Bridge over 16 Mahoning Creek, Punxsutawney Borough, 17 Bridge Painting 250,000 18 (Base Construction Allocation - 19 $235,000) 20 (Design and Contingencies - $15,000) 21 (4) SR 0410, Beaver Run Bridge over Beaver 22 Run, Henderson Township, Bridge 23 Painting 55,000 24 (Base Construction Allocation - 25 $40,000) 26 (Design and Contingencies - $15,000) 27 (5) SR 0830, Falls Creek Bridge over Falls 28 Creek, Falls Creek Township, Bridge 29 Painting 80,000 30 (Base Construction Allocation - 19990S0504B1019 - 349 -
1 $65,000) 2 (Design and Contingencies - $15,000) 3 (6) SR 0949, Corsica Exit Bridge over I- 4 80, Union Township, Bridge Painting 205,000 5 (Base Construction Allocation - 6 $190,000) 7 (Design and Contingencies - $15,000) 8 (7) SR 1009, Kyle's Run Bridge over Kyle's 9 Run, Washington Township, Bridge 10 Painting 60,000 11 (Base Construction Allocation - 12 $45,000) 13 (Design and Contingencies - $15,000) 14 (8) SR 1027, Egypt Bridge over North Fork 15 Creek, Rock Township, Bridge Painting 125,000 16 (Base Construction Allocation - 17 $110,000) 18 (Design and Contingencies - $15,000) 19 (9) SR 2007, Clover Run Bridge over Clover 20 Run, Gaskill Township, Bridge Painting 95,000 21 (Base Construction Allocation - 22 $80,000) 23 (Design and Contingencies - $15,000) 24 (10) SR 2008, Stump Creek Bridge over 25 Stump Creek, Henderson Township, Bridge 26 Painting 100,000 27 (Base Construction Allocation - 28 $85,000) 29 (Design and Contingencies - $15,000) 30 (11) SR 2023, Anita Bridge over Elk Run, 19990S0504B1019 - 350 -
1 McCalmont Township, Bridge Painting 60,000 2 (Base Construction Allocation - 3 $45,000) 4 (Design and Contingencies - $15,000) 5 (12) SR 2023, Charcoal Plant Bridge over 6 Sandy Lick Creek, Pine Creek Township, 7 Bridge Painting 125,000 8 (Base Construction Allocation - 9 $110,000) 10 (Design and Contingencies - $15,000) 11 (13) SR 3003, Baxter Bridge over Redbank 12 Creek, Clover Township, Bridge 13 Painting 235,000 14 (Base Construction Allocation - 15 $220,000) 16 (Design and Contingencies - $15,000) 17 (14) SR 4006, North Fork Creek Bridge over 18 North Fork Creek, Warsaw Township, 19 Bridge Painting 110,000 20 (Base Construction Allocation - 21 $95,000) 22 (Design and Contingencies - $15,000) 23 (15) SR 0310, Bridge over Branch of Trout 24 Run, Winslow Township, Bridge 25 Replacement 490,000 26 (Base Construction Allocation - 27 $350,000) 28 (Land Allocation - $20,000) 29 (Design and Contingencies - $120,000) 30 (16) SR 3018, Bridge over Little Sandy 19990S0504B1019 - 351 -
1 Creek, Limestone Township, Bridge 2 Replacement 670,000 3 (Base Construction Allocation - 4 $500,000) 5 (Land Allocation - $20,000) 6 (Design and Contingencies - $150,000) 7 (17) SR 0028, Knapp Run Bridge over Knapp 8 Run, Clover Township, Bridge 9 Rehabilitation 1,450,000 10 (Base Construction Allocation - 11 $1,000,000) 12 (Land Allocation - $100,000) 13 (Design and Contingencies - $350,000) 14 (18) SR 0028, Coder Run Bridge over Coder 15 Run, Rose Township, Bridge 16 Rehabilitation 1,450,000 17 (Base Construction Allocation - 18 $1,000,000) 19 (Land Allocation - $100,000) 20 (Design and Contingencies - $350,000) 21 (19) SR 0028, Mill Creek Bridge over Mill 22 Creek, Snyder Township, Bridge 23 Rehabilitation 1,050,000 24 (Base Construction Allocation - 25 $750,000) 26 (Land Allocation - $50,000) 27 (Design and Contingencies - $250,000) 28 (20) SR 0028, Redbank Creek Bridge over 29 Tributary of Redbank Creek, Summerville 30 Borough, Bridge Rehabilitation 1,450,000 19990S0504B1019 - 352 -
1 (Base Construction Allocation - 2 $1,000,000) 3 (Land Allocation - $100,000) 4 (Design and Contingencies - $350,000) 5 (21) SR 0028, Seneca Run Bridge over 6 Seneca Run, Warsaw Township, Bridge 7 Rehabilitation 1,050,000 8 (Base Construction Allocation - 9 $750,000) 10 (Land Allocation - $50,000) 11 (Design and Contingencies - $250,000) 12 (22) SR 0080, I-80 Bridge Westbound over 13 PA 36, Brookville Borough, Bridge 14 Rehabilitation 1,450,000 15 (Base Construction Allocation - 16 $1,000,000) 17 (Land Allocation - $100,000) 18 (Design and Contingencies - $350,000) 19 (23) SR 0080, I-80 Bridge Eastbound over 20 PA 36, Brookville Borough, Bridge 21 Rehabilitation 1,450,000 22 (Base Construction Allocation - 23 $1,000,000) 24 (Land Allocation - $100,000) 25 (Design and Contingencies - $350,000) 26 (24) SR 0080, I-80 Bridge over PA 28, Pine 27 Creek Township, Bridge Rehabilitation 1,450,000 28 (Base Construction Allocation - 29 $1,000,000) 30 (Land Allocation - $100,000) 19990S0504B1019 - 353 -
1 (Design and Contingencies - $350,000) 2 (25) SR 0080, I-80 Bridge over Little Mill 3 Creek, Pine Creek Township, Bridge 4 Rehabilitation 1,450,000 5 (Base Construction Allocation - 6 $1,000,000) 7 (Land Allocation - $100,000) 8 (Design and Contingencies - $350,000) 9 (26) SR 0080, I-80 Bridge over Mill Creek, 10 Pine Creek Township, Bridge 11 Rehabilitation 1,450,000 12 (Base Construction Allocation - 13 $1,000,000) 14 (Land Allocation - $100,000) 15 (Design and Contingencies - $350,000) 16 (27) SR 0119, Rock Run Bridge over Rock 17 Run, Bell Township, Bridge 18 Rehabilitation 1,450,000 19 (Base Construction Allocation - 20 $1,000,000) 21 (Land Allocation - $100,000) 22 (Design and Contingencies - $350,000) 23 (28) SR 0119, Stump Creek Bridge over 24 Branch of Stump Creek, Henderson 25 Township, Bridge Rehabilitation 1,450,000 26 (Base Construction Allocation - 27 $1,000,000) 28 (Land Allocation - $100,000) 29 (Design and Contingencies - $350,000) 30 (29) SR 0119, Punxsutawney Bridge over 19990S0504B1019 - 354 -
1 Mahoning Creek, Punxsutawney Borough, 2 Bridge Replacement 2,400,000 3 (Base Construction Allocation - 4 $2,000,000) 5 (Land Allocation - $50,000) 6 (Design and Contingencies - $350,000) 7 (30) SR 0119, Rock Run Bridge over Rock 8 Run, Sykesville Borough, Bridge 9 Rehabilitation 1,450,000 10 (Base Construction Allocation - 11 $1,000,000) 12 (Land Allocation - $100,000) 13 (Design and Contingencies - $350,000) 14 (31) SR 0119, Sugar Camp Run Bridge over 15 Sugar Camp Run, Sykesville Borough, 16 Bridge Rehabilitation 1,450,000 17 (Base Construction Allocation - 18 $1,000,000) 19 (Land Allocation - $100,000) 20 (Design and Contingencies - $350,000) 21 (32) SR 3003, Baxter Bridge over Red Bank 22 Creek, Clover Township, Bridge 23 Rehabilitation 350,000 24 (Base Construction Allocation - 25 $320,000) 26 (Design and Contingencies - $30,000) 27 (33) SR 3005, Worthville Bridge over 28 Little Sandy Creek, Beaver Township, 29 Bridge Painting 115,000 30 (Base Construction Allocation - 19990S0504B1019 - 355 -
1 $100,000) 2 (Design and Contingencies - $15,000) 3 (34) SR 3007, Summerville Borough Bridge 4 over Red Bank Creek, Summerville 5 Borough, Bridge Replacement 1,730,000 6 (Base Construction Allocation - 7 $1,500,000) 8 (Land Allocation - $80,000) 9 (Design and Contingencies - $150,000) 10 (35) SR 3008, Perryville Run Bridge over 11 Perryville Run, Perry Township, Bridge 12 Painting 65,000 13 (Base Construction Allocation - 14 $50,000) 15 (Design and Contingencies - $15,000) 16 (36) SR 3008, Horatio Bridge over Branch 17 of Mahoning Creek, Perry Township, 18 Bridge Painting 55,000 19 (Base Construction Allocation - 20 $40,000) 21 (Design and Contingencies - $15,000) 22 (37) SR 3013, Valier Truss Bridge over 23 Mahoning Creek, Perry Township, Bridge 24 Painting 700,000 25 (Base Construction Allocation - 26 $600,000) 27 (Design and Contingencies - $100,000) 28 (38) SR 3014, Sprankle Mills Bridge over 29 Big Run, Oliver Township, Bridge 30 Painting 100,000 19990S0504B1019 - 356 -
1 (Base Construction Allocation - 2 $85,000) 3 (Design and Contingencies - $15,000) 4 (39) SR 3014, Worthville Bridge over 5 Little Sandy Creek, Perry Township, 6 Bridge Painting 105,000 7 (Base Construction Allocation - 8 $90,000) 9 (Design and Contingencies - $15,000) 10 (40) SR 3018, Coolspring Bridge over 11 Little Sandy Creek, Oliver Township, 12 Bridge Replacement 670,000 13 (Base Construction Allocation - 14 $500,000) 15 (Land Allocation - $20,000) 16 (Design and Contingencies - $150,000) 17 (41) SR 3033, Fivemile Run Bridge over 18 Fivemile Run, Brookville Borough, 19 Bridge Replacement 595,000 20 (Base Construction Allocation - 21 $400,000) 22 (Land Allocation - $20,000) 23 (Design and Contingencies - $175,000) 24 (42) SR 3039, Brookville Bridge No.2 over 25 Fivemile Run, Brookville Borough, 26 Bridge Replacement 590,000 27 (Base Construction Allocation - 28 $500,000) 29 (Land Allocation - $30,000) 30 (Design and Contingencies - $60,000) 19990S0504B1019 - 357 -
1 (43) SR 4005, Richardsville Bridge over 2 North Fork Creek, Warsaw Township, 3 Bridge Replacement 490,000 4 (Base Construction Allocation - 5 $400,000) 6 (Land Allocation - $30,000) 7 (Design and Contingencies - $60,000) 8 (44) SR 4005, Perkin Run Bridge over 9 Perkin Run, Warsaw Township, Bridge 10 Painting 65,000 11 (Base Construction Allocation - 12 $50,000) 13 (Design and Contingencies - $15,000) 14 (45) SR 4005, Richardsville Bridge over 15 North Fork Creek, Warsaw Township, 16 Bridge Painting 90,000 17 (Base Construction Allocation - 18 $75,000) 19 (Design and Contingencies - $15,000) 20 (46) SR 1009, BRIDGE OVER BEAVERDAM RUN, <-- 21 WASHINGTON TOWNSHIP, BRIDGE 22 REPLACEMENT 205,000 23 (BASE CONSTRUCTION ALLOCATION - 24 $120,000) 25 (LAND ALLOCATION - $10,000) 26 (DESIGN AND CONTINGENCIES - $75,000) 27 (47) SR 2019, BRIDGE OVER SAW MILL RUN, 28 HENDERSON TOWNSHIP, BRIDGE REPLACEMENT 205,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $120,000) 19990S0504B1019 - 358 -
1 (LAND ALLOCATION - $10,000) 2 (DESIGN AND CONTINGENCIES - $75,000) 3 (48) SR 2019, DESIRE BRIDGE OVER BIG RUN, 4 MCCALMONT TOWNSHIP, BRIDGE REPLACEMENT 205,000 5 (BASE CONSTRUCTION ALLOCATION - 6 $120,000) 7 (LAND ALLOCATION - $10,000) 8 (DESIGN AND CONTINGENCIES - $75,000) 9 (49) SR 3014, BRIDGE OVER MCCRACKEN RUN, 10 OLIVER TOWNSHIP, BRIDGE REHABILITATION 205,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $120,000) 13 (LAND ALLOCATION - $10,000) 14 (DESIGN AND CONTINGENCIES - $75,000) 15 Section 38. Juniata County. 16 (a) Local Bridges 17 (1) Fayette Township, T-558 over West 18 Branch of Cocolamus Creek, Bridge 19 Rehabilitation 21,000 20 (Base Construction Allocation - 21 $18,000) 22 (Design and Contingencies - $3,000) 23 (2) Fayette Township, T-602 over Little 24 Lost Creek, Bridge Rehabilitation 19,000 25 (Base Construction Allocation - 26 $17,000) 27 (Design and Contingencies - $2,000) 28 (3) Delaware Township, T-471, Delaware 29 Creek Bridge, Bridge Replacement 210,000 30 (Base Construction Allocation - 19990S0504B1019 - 359 -
1 $150,000) 2 (Land Allocation - $10,000) 3 (Design and Contingencies - $50,000) 4 (4) Fermanagh Township, T-410, Lost Creek 5 Bridge, Bridge Replacement 640,000 6 (Base Construction Allocation - 7 $510,000) 8 (Land Allocation - $10,000) 9 (Design and Contingencies - $120,000) 10 (5) Milford Township, T-360, Licking Creek 11 Bridge over Licking Creek, Bridge 12 Rehabilitation 350,000 13 (Base Construction Allocation - 14 $260,000) 15 (Land Allocation - $10,000) 16 (Design and Contingencies - $80,000) 17 (6) Susquehanna Township, T-315, Mahatango 18 Bridge over Mahatango Creek, Bridge 19 Replacement 370,000 20 (Base Construction Allocation - 21 $280,000) 22 (Land Allocation - $10,000) 23 (Design and Contingencies - $80,000) 24 (7) Tuscarora Township, Spectacle Gap 25 Bridge over Spectacle Gap Run, Bridge 26 Replacement 80,000 27 (Base Construction Allocation - 28 $73,000) 29 (Design and Contingencies - $7,000) 30 (8) Tuscarora Township, T-309, Tuscarora 19990S0504B1019 - 360 -
1 Creek Bridge, Bridge Replacement 1,200,000 2 (Base Construction Allocation - 3 $930,000) 4 (Land Allocation - $20,000) 5 (Design and Contingencies - $250,000) 6 (9) Tuscarora Township, T-387, Willow Run 7 Bridge, Bridge Replacement 370,000 8 (Base Construction Allocation - 9 $260,000) 10 (Land Allocation - $10,000) 11 (Design and Contingencies - $100,000) 12 (b) State Bridges 13 (1) SR 0850, Laurel Run Bridge over Laurel 14 Run, Village of Honey Grove, Tuscarora 15 Township, Bridge Replacement 670,000 16 (Base Construction Allocation - 17 $500,000) 18 (Land Allocation - $20,000) 19 (Design and Contingencies - $150,000) 20 (2) SR 0850, Bridge over Tuscarora Creek, 21 Tuscarora Township, Bridge 22 Rehabilitation 155,000 23 (Base Construction Allocation - 24 $150,000) 25 (Design and Contingencies - $5,000) 26 (3) SR 0850, Bridge over Tuscarora Creek, 27 Tuscarora Township, Bridge Replacement 1,420,000 28 (Base Construction Allocation - 29 $1,280,000) 30 (Land Allocation - $40,000) 19990S0504B1019 - 361 -
1 (Design and Contingencies - $100,000) 2 (4) SR 0035, Lost Creek Bridge over Lost 3 Creek, Fayette Township, Bridge 4 Replacement 795,000 5 (Base Construction Allocation - 6 $600,000) 7 (Land Allocation - $10,000) 8 (Design and Contingencies - $185,000) 9 (5) SR 0035, Juniata River Bridge over 10 Juniata River, Mifflintown Borough, 11 Bridge Replacement 4,700,000 12 (Base Construction Allocation - 13 $4,000,000) 14 (Land Allocation - $200,000) 15 (Design and Contingencies - $500,000) 16 (6) SR 0075, Bridge over US 22, Walker 17 Township, Bridge Painting 810,000 18 (Base Construction Allocation - 19 $800,000) 20 (Design & Contingencies - $10,000) 21 (7) SR 0333, Delaware Creek Bridge, 22 Thompsontown Borough, Bridge 23 Replacement 560,000 24 (Base Construction Allocation - 25 $400,000) 26 (Land Allocation - $10,000) 27 (Design and Contingencies - $150,000) 28 (8) SR 1002, Lost Creek Bridge over Lost 29 Creek, Fermanagh Township, Bridge 30 Replacement 920,000 19990S0504B1019 - 362 -
1 (Base Construction Allocation - 2 $730,000) 3 (Land Allocation - $10,000) 4 (Design and Contingencies - $180,000) 5 (9) SR 1004, Little Lost Creek Bridge over 6 Little Lost Creek, Fayette Township, 7 Bridge Replacement 260,000 8 (Base Construction Allocation - 9 $150,000) 10 (Land Allocation - $10,000) 11 (Design and Contingencies - $100,000) 12 (10) SR 2010, Stoney Run Bridge over 13 Tributary of Stoney Run, Monroe 14 Township, Bridge Replacement 290,000 15 (Base Construction Allocation - 16 $180,000) 17 (Land Allocation - $30,000) 18 (Design and Contingencies - $80,000) 19 (11) SR 3025, Tuscarora Creek Bridge over 20 Tuscarora Creek, Lack Township, Bridge 21 Replacement 560,000 22 (Base Construction Allocation - 23 $500,000) 24 (Land Allocation - $10,000) 25 (Design and Contingencies - $50,000) 26 Section 39. Lackawanna County. 27 (a) Local Bridges 28 (1) Mayfield Borough, Poplar Street Bridge 29 No.1 at Junction of South Washington 30 Avenue, Bridge Rehabilitation 150,000 19990S0504B1019 - 363 -
1 (Base Construction Allocation - 2 $130,000) 3 (Design and Contingencies - $20,000) 4 (2) Benton Township, T-474 and T-470, 5 Seamans Bridge, Bridge Rehabilitation 800,000 6 (3) South Abington Township, Leach Street 7 Bridge, Bridge Replacement 500,000 8 (b) State Bridges 9 (1) SR 1016, Hill Street Bridge over 10 Lackawanna River, Jessup and Blakely 11 Boroughs, Bridge Deck Rehabilitation 890,000 12 (Base Construction Allocation - 13 $800,000) 14 (Land Allocation - $10,000) 15 (Design and Contingencies - $80,000) 16 (2) SR 3011, Keyser Avenue Bridge over 17 Lindy Creek, City of Scranton, Bridge 18 Replacement 185,000 19 (Base Construction Allocation - 20 $100,000) 21 (Land Allocation - $10,000) 22 (Design and Contingencies - $75,000) 23 (3) SR 0171, Bridge over Elk Creek at 24 Junction of SR 1011, Fell Township, 25 Bridge Replacement 660,000 26 (Base Construction Allocation - 27 $520,000) 28 (Land Allocation - $10,000) 29 (Design and Contingencies - $130,000) 30 (4) SR 0247, Bridge over South Branch of 19990S0504B1019 - 364 -
1 Tunkhannock Creek, North of TR 438, 2 Scott Township, Bridge Replacement 426,000 3 (Base Construction Allocation - 4 $330,000) 5 (Land Allocation - $10,000) 6 (Design and Contingencies - $86,000) 7 (5) SR 2003, Bridge over Wallenpaupack 8 Creek, North of TR 348, Jefferson 9 Township, Bridge Replacement 355,000 10 (Base Construction Allocation - 11 $275,000) 12 (Land Allocation - $10,000) 13 (Design and Contingencies - $70,000) 14 (6) SR 3013, Main Street Bridge, Old Forge 15 Borough, Bridge Painting 660,000 16 (Base Construction Allocation - 17 $600,000) 18 (Design and Contingencies - $60,000) 19 (7) State Bridges, Countywide Bridge Zone 20 Painting, Bridge Painting 370,000 21 (Base Construction Allocation - 22 $350,000) 23 (Land Allocation - $10,000) 24 (Design and Contingencies - $10,000) 25 (8) SR 1013, Bridge over Elm Brook, 0.7 26 Mile North of SR 1006, Scott Township, 27 Bridge Replacement 240,000 28 (Base Construction Allocation - 29 $200,000) 30 (Land Allocation - $10,000) 19990S0504B1019 - 365 -
1 (Design and Contingencies - $30,000) 2 (9) SR 0524, Kennedy Creek Bridge, 0.5 3 Mile East of TR 407, North Abington 4 Township, Bridge Replacement 330,000 5 (Base Construction Allocation - 6 $280,000) 7 (Land Allocation - $10,000) 8 (Design and Contingencies - $40,000) 9 (10) SR 0011, Roaring Brook Retaining 10 Wall, Spruce Street Complex, City of 11 Scranton, Bridge Replacement 1,320,000 12 (Base Construction Allocation - 13 $1,160,000) 14 (Land Allocation - $10,000) 15 (Design and Contingencies - $150,000) 16 (11) SR 3020, Linden Street Bridge over 17 Lackawanna River, City of Scranton, 18 Bridge Rehabilitation 480,000 19 (Base Construction Allocation - 20 $380,000) 21 (Design and Contingencies - $100,000) 22 (12) SR 4007, Ackerly Creek Bridge over 23 Ackerly Creek, Abington Township, 24 Bridge Replacement 363,000 25 (Base Construction Allocation - 26 $264,000) 27 (Land Allocation - $11,000) 28 (Design and Contingencies - $88,000) 29 (13) SR 0011, BIRNEY AVENUE BRIDGE OVER SR <-- 30 8001 RAMP H, MOOSIC BOROUGH, BRIDGE 19990S0504B1019 - 366 -
1 REHABILITATION 320,000 2 (BASE CONSTRUCTION ALLOCATION - 3 $300,000) 4 (LAND ALLOCATION - $5,000) 5 (DESIGN AND CONTINGENCIES - $15,000) 6 (14) SR 2011, BRIDGE OVER LEHIGH RIVER, 7 CLIFTON TOWNSHIP, BRIDGE 8 REHABILITATION 120,000 9 (BASE CONSTRUCTION ALLOCATION - 10 $100,000) 11 (LAND ALLOCATION - $5,000) 12 (DESIGN AND CONTINGENCIES - $15,000) 13 Section 40. Lancaster County. 14 (a) Local Bridges 15 (1) Manor Township, T-599, West Roseville 16 Road Bridge over Little Conestoga 17 Creek, Bridge Replacement 375,000 18 (Base Construction Allocation - 19 $286,000) 20 (Land Allocation - $10,000) 21 (Design and Contingencies - $150,000) 22 (2) Mt. Joy Township, T-350, Risser Mill 23 Bridge over Tributary of Little 24 Chickies Creek, Bridge Rehabilitation 550,000 25 (Base Construction Allocation - 26 $400,000) 27 (Design and Contingencies - $150,000) 28 (3) Pequea Township, Silver Mine Road at 29 Burnt Mills, Bridge Replacement 100,000 30 (Base Construction Allocation - 19990S0504B1019 - 367 -
1 $90,000) 2 (Design and Contingencies - $10,000) 3 (4) East Hempfield and Manheim Townships, 4 Shreiner Station Road Bridge over 5 Conestoga Creek, Bridge Replacement 477,000 6 (Base Construction Allocation - 7 $377,000) 8 (Land Allocation - $20,000) 9 (Design and Contingencies - $80,000) 10 (5) City of Lancaster, Liberty Avenue 11 Bridge over Conrail, New Bridge 12 Construction 5,000,000 13 (Base Construction Allocation - 14 $4,400,000) 15 (Land Allocation - $100,000) 16 (Design and Contingencies - $500,000) 17 (6) MANHEIM BOROUGH, EAST STIEGEL STREET <-- 18 BRIDGE OVER CHICKIES CREEK, BRIDGE 19 REPLACEMENT 423,000 20 (BASE CONSTRUCTION ALLOCATION - 21 $378,000) 22 (DESIGN AND CONTINGENCIES - $45,000) 23 (7) PENN TOWNSHIP AND MANHEIM BOROUGH, 24 POWER ROAD AND FULLER DRIVE BRIDGE OVER 25 CHICKIES CREEK, BRIDGE REHABILITATION 25,000 26 (b) State Bridges 27 (1) SR 1024, Bridge over Little Cocalico 28 Creek, East Cocalico Township, Bridge 29 Replacement 675,000 30 (Base Construction Allocation - 19990S0504B1019 - 368 -
1 $550,000) 2 (Land Allocation - $25,000) 3 (Design and Contingencies - $100,000) 4 (2) PA 372, BRIDGE OVER BUCK RUN, SADSBURY <-- 5 TOWNSHIP, BRIDGE REPLACEMENT 172,000 6 (BASE CONSTRUCTION ALLOCATION - 7 $127,000) 8 (LAND ALLOCATION - $13,000) 9 (DESIGN AND CONTINGENCIES - $32,000) 10 (3) SR 0897, BRIDGE OVER MUDDY CREEK, 11 BRECKROCK TOWNSHIP, BRIDGE REPLACEMENT 1,636,000 12 (BASE CONSTRUCTION ALLOCATION - 13 $1,212,000) 14 (LAND ALLOCATION - $121,000) 15 (DESIGN AND CONTINGENCIES - $303,000) 16 (4) SR 1011, BRIDGE OVER TRIBUTARY OF 17 MUDDY CREEK, EARL TOWNSHIP, BRIDGE 18 REPLACEMENT 522,000 19 (BASE CONSTRUCTION ALLOCATION - 20 $386,000) 21 (LAND ALLOCATION - $39,000) 22 (DESIGN AND CONTINGENCIES - $97,000) 23 (5) SR 2019, BRIDGE OVER BEAVER CREEK, 24 MANOR TOWNSHIP, BRIDGE REPLACEMENT 771,000 25 (BASE CONSTRUCTION ALLOCATION - 26 $571,000) 27 (LAND ALLOCATION - $57,000) 28 (DESIGN AND CONTINGENCIES - $143,000) 29 (6) SR 1045, BRIDGE OVER COCALICO CREEK, 30 DENVER BOROUGH, BRIDGE REPLACEMENT 1,317,000 19990S0504B1019 - 369 -
1 (BASE CONSTRUCTION ALLOCATION - 2 $975,000) 3 (LAND ALLOCATION - $98,000) 4 (DESIGN AND CONTINGENCIES - $244,000) 5 (7) SR 1053, BRIDGE OVER COCALICO CREEK, 6 WEST EARL TOWNSHIP, BRIDGE REPLACEMENT 629,000 7 (BASE CONSTRUCTION ALLOCATION - 8 $465,000) 9 (LAND ALLOCATION - $47,000) 10 (DESIGN AND CONTINGENCIES - $117,000) 11 (8) SR 1026, BRIDGE OVER COCALICO CREEK, 12 WEST COCALICO TOWNSHIP, BRIDGE 13 REPLACEMENT 1,173,000 14 (BASE CONSTRUCTION ALLOCATION - 15 $869,000) 16 (LAND ALLOCATION - $87,000) 17 (DESIGN AND CONTINGENCIES - $217,000) 18 (9) SR 3032, BRIDGE OVER LITTLE CONESTOGA 19 CREEK, MANOR TOWNSHIP, BRIDGE 20 REPLACEMENT 1,050,000 21 (BASE CONSTRUCTION ALLOCATION - 22 $777,000) 23 (LAND ALLOCATION - $78,000) 24 (DESIGN AND CONTINGENCIES - $195,000) 25 (10) SR 3017, BRIDGE OVER WEST BRANCH OF 26 CONESTOGA CREEK, STRASBURG TOWNSHIP, 27 BRIDGE REPLACEMENT 523,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $387,000) 30 (LAND ALLOCATION - $39,000) 19990S0504B1019 - 370 -
1 (DESIGN AND CONTINGENCIES - $97,000) 2 (11) SR 1035, BRIDGE OVER MIDDLE CREEK, 3 CLAY TOWNSHIP, BRIDGE REPLACEMENT 527,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $390,000) 6 (LAND ALLOCATION - $39,000) 7 (DESIGN AND CONTINGENCIES - $98,000) 8 (12) SR 2036, BRIDGE OVER CONESTOGA RIVER, 9 WEST LAMPETER TOWNSHIP, BRIDGE 10 REHABILITATION 1,704,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $1,263,000) 13 (LAND ALLOCATION - $126,000) 14 (DESIGN AND CONTINGENCIES - $315,000) 15 (13) PA 222, BRIDGE OVER PEQUEA CREEK, 16 WEST LAMPETER TOWNSHIP, BRIDGE 17 REHABILITATION 1,421,000 18 (BASE CONSTRUCTION ALLOCATION - 19 $1,053,000) 20 (LAND ALLOCATION - $105,000) 21 (DESIGN AND CONTINGENCIES - $263,000) 22 (14) SR 0741, BRIDGE OVER CONESTOGA RIVER, 23 LANCASTER TOWNSHIP, BRIDGE 24 REHABILITATION 848,000 25 (BASE CONSTRUCTION ALLOCATION - 26 $628,000) 27 (LAND ALLOCATION - $63,000) 28 (DESIGN AND CONTINGENCIES - $157,000) 29 (15) PA 472, BRIDGE OVER OCTORARO CREEK, 30 COLERAIN TOWNSHIP, BRIDGE 19990S0504B1019 - 371 -
1 REHABILITATION 1,806,000 2 (BASE CONSTRUCTION ALLOCATION - 3 $1,337,000) 4 (LAND ALLOCATION - $134,000) 5 (DESIGN AND CONTINGENCIES - $335,000) 6 (16) MT. JOY STATION PEDESTRIAN OVERPASS 7 OVER AMTRAK AND KEYSTONE MAIN LINE, MT. 8 JOY BOROUGH, NEW PEDESTRIAN BRIDGE 2,500,000 9 (BASE CONSTRUCTION ALLOCATION - 10 $2,400,000) 11 (LAND ALLOCATION - $20,000) 12 (DESIGN AND CONTINGENCIES - $80,000) 13 Section 41. Lawrence County. 14 (a) Local Bridges 15 (1) City of New Castle, Willard Avenue 16 Bridge over Tributary of Shenango 17 River, Bridge Replacement 210,000 18 (Base Construction Allocation - 19 $150,000) 20 (Land Allocation - $20,000) 21 (Design and Contingencies - $40,000) 22 (2) Wampum Borough, Main Street Bridge 23 over Eckles Run, Bridge Rehabilitation 190,000 24 (Base Construction Allocation - 25 $150,000) 26 (Design and Contingencies - $40,000) 27 (3) HICKORY TOWNSHIP, T-478, BRIDGE OVER <-- 28 HETTENBAUGH RUN, BRIDGE REPLACEMENT 350,000 29 (4) LITTLE BEAVER TOWNSHIP, T-340, BRIDGE 30 OVER LITTLE BEAVER CREEK, BRIDGE 19990S0504B1019 - 372 -
1 REPLACEMENT 400,000 2 (5) PULASKI TOWNSHIP, T-382, BRIDGE OVER 3 BUCHANAN RUN, BRIDGE REPLACEMENT 400,000 4 (6) SCOTT TOWNSHIP, T-485, BRIDGE OVER 5 SLIPPERY ROCK CREEK, BRIDGE 6 REPLACEMENT 350,000 7 (BASE CONSTRUCTION ALLOCATION - 8 $350,000) 9 (7) SLIPPERY ROCK TOWNSHIP, T-395, BRIDGE 10 OVER HELL'S RUN, BRIDGE REPLACEMENT 16,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $16,000) 13 (8) UNION TOWNSHIP, T-420, BRIDGE OVER 14 TRIBUTARY OF SHENANGO RIVER, BRIDGE 15 REPLACEMENT 500,000 16 (9) WILMINGTON TOWNSHIP, T-476, BRIDGE 17 OVER NESHANNOCK CREEK, BRIDGE 18 REPLACEMENT 500,000 19 (10) WILMINGTON TOWNSHIP, T-464, BRIDGE 20 OVER NESHANNOCK CREEK, BRIDGE 21 REPLACEMENT 800,000 22 (b) State Bridges 23 (1) SR 0018, Mahoning Avenue Viaduct over 24 Shenango River and Railroad, City of 25 New Castle, Bridge Replacement 9,320,000 26 (Base Construction Allocation - 27 $9,000,000) 28 (Land Allocation - $20,000) 29 (Design and Contingencies - $300,000) 30 (2) SR 0018, Liberty Street Bridge over 19990S0504B1019 - 373 -
1 Hickory Run, New Castle City, Bridge 2 Rehabilitation 450,000 3 (Base Construction Allocation - 4 $300,000) 5 (Land Allocation - $50,000) 6 (Design and Contingencies - $100,000) 7 (3) SR 0060, SR 0060 Southbound over SR 8 4004, Neshannock Township, Bridge 9 Replacement 350,000 10 (Base Construction Allocation - 11 $200,000) 12 (Land Allocation - $50,000) 13 (Design and Contingencies - $100,000) 14 (4) SR 0065, Ellwood Road Bridge over B & 15 O Railroad, Shenango Township, Bridge 16 Replacement 400,000 17 (Base Construction Allocation - 18 $250,000) 19 (Land Allocation - $50,000) 20 (Design and Contingencies - $100,000) 21 (5) SR 0488, Portersville Road Bridge over 22 Morrison Run, Perry Township, Bridge 23 Replacement 250,000 24 (Base Construction Allocation - 25 $100,000) 26 (Land Allocation - $50,000) 27 (Design and Contingencies - $100,000) 28 (6) SR 0488, Portersville Road Bridge over 29 Morrison Run, Perry Township, Bridge 30 Replacement 250,000 19990S0504B1019 - 374 -
1 (Base Construction Allocation - 2 $100,000) 3 (Land Allocation - $50,000) 4 (Design and Contingencies - $100,000) 5 (7) SR 3001, South Main Street Bridge over 6 Bessemer Haul Road, Bessemer Borough, 7 Bridge Rehabilitation 950,000 8 (Base Construction Allocation - 9 $800,000) 10 (Design and Contingencies - $150,000) 11 (8) SR 4004, Union and Neshannock 12 Townships, Bridge Rehabilitation 800,000 13 (Base Construction Allocation - 14 $700,000) 15 (Design and Contingencies - $100,000) 16 (9) SR 0060, Beaver Valley Expansion 17 Bridge over SR 4005, Neshannock 18 Township, Bridge Rehabilitation 650,000 19 (Base Construction Allocation - 20 $500,000) 21 (Design and Contingencies - $150,000) 22 (10) SR 0060, Beaver Valley Extension 23 Bridge over SR 4005, Neshannock 24 Township, Bridge Rehabilitation 127,000 25 (Base Construction Allocation - 26 $116,000) 27 (Design and Contingencies - $11,000) 28 (11) SR 0081, US 224 State Street Bridge 29 over SR 0422 and Ramp K, Union 30 Township, Bridge Rehabilitation 706,000 19990S0504B1019 - 375 -
1 (Base Construction Allocation - 2 $644,000) 3 (Design and Contingencies - $62,000) 4 (12) SR 0422, Westbound Bridge over Beaver 5 River, Railroad and Local Street, 6 Taylor Township, Bridge Rehabilitation 6,841,000 7 (Base Construction Allocation - 8 $6,741,000) 9 (Design and Contingencies - $100,000) 10 (13) SR 0422, Eastbound Bridge over Beaver 11 River, Railroad and Local Street, 12 Taylor Township, Bridge Replacement 6,963,000 13 (Base Construction Allocation - 14 $6,863,000) 15 (Design and Contingencies - $100,000) 16 (14) SR 0422, Bridge over Business US 422, 17 Union Township, Bridge Rehabilitation 1,379,000 18 (Base Construction Allocation - 19 $1,254,000) 20 (Design and Contingencies - $125,000) 21 (15) SR 0422, Ben Franklin Highway Bridge 22 over Business US 422, Union Township, 23 Bridge Rehabilitation 436,000 24 (Base Construction Allocation - 25 $398,000) 26 (Design and Contingencies - $38,000) 27 (16) SR 0551, Main Street Bridge over 28 Beaver Creek, Little Beaver Township, 29 Bridge Replacement 624,000 30 (Base Construction Allocation - 19990S0504B1019 - 376 -
1 $524,000) 2 (Design and Contingencies - $100,000) 3 (17) SR 2020, Pleasant Road Bridge over 4 Camp Run, Perry Township, Bridge 5 Replacement 400,000 6 (Base Construction Allocation - 7 $300,000) 8 (Design and Contingencies - $100,000) 9 (18) SR 3002, Beaver Dam Road Bridge over 10 Honey Creek, Little Beaver Township, 11 Bridge Painting 30,000 12 (Base Construction Allocation - 13 $25,000) 14 (Design and Contingencies - $5,000) 15 (19) SR 3004, Wallace Road Bridge over 16 Sugar Creek, North Beaver Township, 17 Bridge Replacement 130,000 18 (Base Construction Allocation - 19 $120,000) 20 (Design and Contingencies - $10,000) 21 (20) SR 3004, Wallace Road Bridge over 22 Branch of Honey Creek, North Beaver 23 Township, Bridge Painting 30,000 24 (Base Construction Allocation - 25 $25,000) 26 (Design and Contingencies - $5,000) 27 (21) SR 3004, Wallace Road Bridge over 28 Branch of Honey Creek, North Beaver 29 Township, Bridge Painting 325,000 30 (Base Construction Allocation - 19990S0504B1019 - 377 -
1 $300,000) 2 (Design and Contingencies - $25,000) 3 (22) SR 4006, Coffee Run Bridge over 4 Coffee Run, Mahoning Township, Bridge 5 Replacement 335,000 6 (Base Construction Allocation - 7 $270,000) 8 (Land Allocation - $15,000) 9 (Design and Contingencies - $50,000) 10 (23) SR 0224, Bridge over Conrail, 11 Mahoning Township, Bridge Replacement 2,000,000 12 (Base Construction Allocation - 13 $1,700,000) 14 (Land Allocation - $100,000) 15 (Design and Contingencies - $200,000) 16 (24) SR 2003, Wurtemburg Road Bridge over 17 Branch of Duck Run, Mahoning Township, 18 Bridge Replacement 135,000 19 (Base Construction Allocation - 20 $100,000) 21 (Land Allocation - $20,000) 22 (Design and Contingencies - $15,000) 23 (25) SR 0168, Moravia Street Bridge over 24 US 422, Taylor Township, Bridge 25 Rehabilitation 761,000 26 (Base Construction Allocation - 27 $662,000) 28 (Design and Contingencies - $99,000) 29 (26) SR 0288, Main Street Bridge over 30 Tributary of Beaver River, Wayne 19990S0504B1019 - 378 -
1 Township, Bridge Replacement 296,000 2 (Base Construction Allocation - 3 $240,000) 4 (Land Allocation - $20,000) 5 (Design and Contingencies - $36,000) 6 (27) SR 1001, High Street Bridge over 7 Little Neshannock Creek, New Wilmington 8 Borough, Bridge Replacement 89,000 9 (Base Construction Allocation - 10 $60,000) 11 (Land Allocation - $20,000) 12 (Design and Contingencies - $9,000) 13 (28) SR 2007, Armstrong Road Bridge over 14 Branch of Slippery Rock Creek, Perry 15 Township, Bridge Replacement 420,000 16 (Base Construction Allocation - 17 $300,000) 18 (Land Allocation - $20,000) 19 (Design and Contingencies - $100,000) 20 (29) SR 3004, Honey Creek Bridge No.1 over 21 Branch of Honey Creek, North Beaver 22 Township, Bridge Rehabilitation 25,000 23 (Base Construction Allocation - 24 $20,000) 25 (Design and Contingencies - $5,000) 26 (30) SR 3004, Honey Creek Bridge No.2 over 27 Branch of Honey Creek, North Beaver 28 Township, Bridge Painting 25,000 29 (Base Construction Allocation - 30 $20,000) 19990S0504B1019 - 379 -
1 (Design and Contingencies - $5,000) 2 (31) SR 3004, Honey Creek Bridge No.3 over 3 Branch of Honey Creek, North Beaver 4 Township, Bridge Painting 25,000 5 (Base Construction Allocation - 6 $20,000) 7 (Design and Contingencies - $5,000) 8 (32) SR 4001, Villa Maria Road Bridge over 9 Tributary of Coffee Run, Mahoning 10 Township, Bridge Replacement 234,000 11 (Base Construction Allocation - 12 $186,000) 13 (Land Allocation - $20,000) 14 (Design and Contingencies - $28,000) 15 (33) SR 0488, BRIDGE OVER CONNEQUESSING <-- 16 CREEK, ELLPORT BOROUGH, BRIDGE 17 REHABILITATION 3,010,000 18 (34) SR 4007, BRIDGE OVER SANKEY RUN, 19 UNION TOWNSHIP, BRIDGE REPLACEMENT 400,000 20 (LAND ALLOCATION - $50,000) 21 (DESIGN AND CONTINGENCIES - $350,000) 22 (35) SR 2005, BRIDGE OVER SLIPPERY ROCK 23 CREEK, WAYNE AND PERRY TOWNSHIPS, 24 BRIDGE REPLACEMENT 793,000 25 (LAND ALLOCATION - $150,000) 26 (DESIGN AND CONTINGENCIES - $643,000) 27 Section 42. Lebanon County. 28 (a) Local Bridges 29 (1) Union Township, T-617, Green Point 30 School House Bridge over Trout Run, 19990S0504B1019 - 380 -
1 Bridge Replacement 255,000 2 (Base Construction Allocation - 3 $170,000) 4 (Land Allocation - $10,000) 5 (Design and Contingencies - $75,000) 6 (2) Bethel Township, Market Drive, T-545 7 over Beach Run, Bridge Replacement 30,000 8 (Base Construction Allocation - 9 $20,000) 10 (Design and Contingencies - $10,000) 11 (3) South Londonderry Township, Patrick 12 Road, T-331 over Tributary of Little 13 Conewago Creek, Bridge Rehabilitation 5,000 14 (Base Construction Allocation - $4,000) 15 (Design and Contingencies - $1,000) 16 (4) South Londonderry Township, Eckert 17 Road, T-304 over Little Conewago Creek, 18 Bridge Rehabilitation 5,000 19 (Base Construction Allocation - $4,000) 20 (Design and Contingencies - $1,000) 21 (5) South Londonderry Township, Risser 22 Road, T-300 over Conewago Creek, Bridge 23 Rehabilitation 4,000 24 (Base Construction Allocation - $3,000) 25 (Design and Contingencies - $1,000) 26 (6) South Londonderry Township, Long Road, 27 T-304 over Tributary of Conewago Creek, 28 Bridge Rehabilitation 4,000 29 (Base Construction Allocation - $3,000) 30 (Design and Contingencies - $1,000) 19990S0504B1019 - 381 -
1 (7) South Londonderry Township, Eckert 2 Road, T-304 over Tributary of Little 3 Conewago Creek, Bridge Rehabilitation 5,000 4 (Base Construction Allocation - $4,000) 5 (Design and Contingencies - $1,000) 6 (8) South Londonderry Township, Church 7 Road, T-303 over Unnamed Creek, Bridge 8 Rehabilitation 3,000 9 (Base Construction Allocation - $2,000) 10 (Design and Contingencies - $1,000) 11 (9) South Londonderry Township, Patrick 12 Road, T-331 over Tributary of Little 13 Conewago Creek, Bridge Rehabilitation 4,000 14 (Base Construction Allocation - $3,000) 15 (Design and Contingencies - $1,000) 16 (10) South Londonderry Township, Hinkle 17 Road, T-433 over Killinger Creek, 18 Bridge Rehabilitation 4,000 19 (Base Construction Allocation - $3,000) 20 (Design and Contingencies - $1,000) 21 (11) South Londonderry Township, Brandt 22 Road, T-346 over Killinger Creek, 23 Bridge Rehabilitation 3,000 24 (Base Construction Allocation - $2,000) 25 (Design and Contingencies - $1,000) 26 (12) Union Township, Green Point School 27 House Road, T-617 over Trout Run, 28 Bridge Replacement 90,000 29 (Base Construction Allocation - 30 $70,000) 19990S0504B1019 - 382 -
1 (Design and Contingencies - $20,000)
2 (13) South Lebanon Township, Wilhelm
3 Overpass, Reconstruct as Pedestrian
4 Bridge 150,000
5 (Base Construction Allocation -
6 $125,000)
7 (Design and Contingencies - $25,000)
8 (b) State Bridges (Reserved) <--
9 (B) STATE BRIDGES <--
10 (1) PA 934, BRIDGE OVER CONRAIL, ANNVILLE
11 TOWNSHIP, BRIDGE REPLACEMENT 981,000
12 (BASE CONSTRUCTION ALLOCATION -
13 $726,000)
14 (LAND ALLOCATION - $73,000)
15 (DESIGN AND CONTINGENCIES - $182,000)
16 (2) SR 2014, BRIDGE OVER MILL CREEK,
17 MILLCREEK TOWNSHIP, BRIDGE REPLACEMENT 691,000
18 (BASE CONSTRUCTION ALLOCATION -
19 $512,000)
20 (LAND ALLOCATION - $51,000)
21 (DESIGN AND CONTINGENCIES - $128,000)
22 Section 43. Lehigh County.
23 (a) Local Bridges
24 (1) Coplay and Northampton Boroughs,
25 Chestnut Street Bridge over Lehigh
26 River, Bridge Rehabilitation 2,000,000
27 (Base Construction Allocation -
28 $1,900,000)
29 (Design and Contingencies - $100,000)
30 (2) Hokendauqua and North Catasauqua
19990S0504B1019 - 383 -
1 Boroughs, Lehigh Street Bridge over 2 Lehigh River, Bridge Replacement 8,750,000 3 (Base Construction Allocation - 4 $8,500,000) 5 (Design and Contingencies - $250,000) 6 (3) ALLENTOWN CITY, LINDEN STREET BRIDGE <-- 7 OVER JORDAN CREEK, BRIDGE 8 REHABILITATION 1,680,000 9 (BASE CONSTRUCTION ALLOCATION - 10 $1,600,000) 11 (DESIGN AND CONTINGENCIES - $80,000) 12 (b) State Bridges 13 (1) SR 4007, Schlicher's Bridge over 14 Jordan Creek, North Whitehall Township, 15 Bridge Replacement 875,000 16 (Base Construction Allocation - 17 $560,000) 18 (Land Allocation - $145,000) 19 (Design and Contingencies - $170,000) 20 (2) SR 3011, Farmington Road over 21 Tributary of Schaffer Run, Upper 22 Macungie Township, Bridge 23 Rehabilitation 330,000 24 (Base Construction Allocation - 25 $175,000) 26 (Land Allocation - $55,000) 27 (Design and Contingencies - $100,000) 28 (3) SR 1027, Cold Springs Road over Spring 29 Creek, Whitehall Township, Bridge 30 Replacement 2,550,000 19990S0504B1019 - 384 -
1 (Base Construction Allocation - 2 $1,640,000) 3 (Land Allocation - $420,000) 4 (Design and Contingencies - $490,000) 5 (4) SR 0378, BRIDGES OVER 14TH, 8TH AND <-- 6 EATON AVENUE, CATASAQUA AND BROAD 7 STREETS, BRIDGE REPLACEMENT 457,000 8 (BASE CONSTRUCTION ALLOCATION - 9 $400,000) 10 (LAND ALLOCATION - $12,000) 11 (DESIGN AND CONTINGENCIES - $45,000) 12 (5) AMERICAN PARKWAY BRIDGE OVER LEHIGH 13 RIVER, ALLENTOWN CITY, BRIDGE 14 REPLACEMENT 17,000,000 15 (BASE CONSTRUCTION ALLOCATION - 16 $15,000,000) 17 (LAND ALLOCATION - $1,000,000) 18 (DESIGN AND CONTINGENCIES - $1,000,000) 19 Section 44. Luzerne County. 20 (a) Local Bridges 21 (1) Ashley Borough, Ashley Street Bridge, 22 Bridge Removal 260,000 23 (Base Construction Allocation - 24 $200,000) 25 (Land Allocation - $5,000) 26 (Design and Contingencies - $55,000) 27 (2) Franklin Township, T-784, Bridge over 28 Sutton Creek, Bridge Replacement 320,000 29 (Base Construction Allocation - 30 $250,000) 19990S0504B1019 - 385 -
1 (Land Allocation - $15,000) 2 (Design and Contingencies - $55,000) 3 (3) Black Creek Township, T-309 over Falls 4 Run Creek, Bridge Replacement 395,000 5 (Base Construction Allocation - 6 $265,000) 7 (Land Allocation - $5,000) 8 (Design and Contingencies - $125,000) 9 (4) Black Creek Township, T-314 over 10 Branch of Black Creek, Bridge 11 Replacement 440,000 12 (Base Construction Allocation - 13 $310,000) 14 (Land Allocation - $5,000) 15 (Design and Contingencies - $125,000) 16 (5) Butler Township, T-356 over Nescopeck 17 Creek, Bridge Replacement 405,000 18 (Base Construction Allocation - 19 $275,000) 20 (Land Allocation - $5,000) 21 (Design and Contingencies - $125,000) 22 (6) City of Wilkes-Barre, Division Street 23 over Solomon's Creek, Bridge 24 Replacement 955,000 25 (Base Construction Allocation - 26 $800,000) 27 (Land Allocation - $5,000) 28 (Design and Contingencies - $150,000) 29 (7) Dallas Township, County Road No.12 30 over Toby's Creek, Bridge Replacement 405,000 19990S0504B1019 - 386 -
1 (Base Construction Allocation - 2 $275,000) 3 (Land Allocation - $5,000) 4 (Design and Contingencies - $125,000) 5 (8) Dennison Township, County Road No.41 6 over Nescopeck Creek, Bridge 7 Replacement 405,000 8 (Base Construction Allocation - 9 $275,000) 10 (Land Allocation - $5,000) 11 (Design and Contingencies - $125,000) 12 (9) Dorrance Township, County Road No.30 13 over Wapwallopen Creek, Bridge 14 Replacement 405,000 15 (Base Construction Allocation - 16 $275,000) 17 (Land Allocation - $5,000) 18 (Design and Contingencies - $125,000) 19 (10) Fairmount Township, T-563 over Maple 20 Run Creek, Bridge Replacement 395,000 21 (Base Construction Allocation - 22 $265,000) 23 (Land Allocation - $5,000) 24 (Design and Contingencies - $125,000) 25 (11) Franklin Township, T-782 over Sutton 26 Creek, Bridge Replacement 405,000 27 (Base Construction Allocation - 28 $275,000) 29 (Land Allocation - $5,000) 30 (Design and Contingencies - $125,000) 19990S0504B1019 - 387 -
1 (12) Hunlock Township, T-534 over Hunlock 2 Creek, Bridge Replacement 405,000 3 (Base Construction Allocation - 4 $275,000) 5 (Land Allocation - $5,000) 6 (Design and Contingencies - $125,000) 7 (13) Jackson Township, County Road No.16 8 over Toby's Creek, Bridge Replacement 350,000 9 (Base Construction Allocation - 10 $225,000) 11 (Land Allocation - $5,000) 12 (Design and Contingencies - $120,000) 13 (14) Jackson Township, County Road No.16 14 over Toby's Creek, Bridge Replacement 370,000 15 (Base Construction Allocation - 16 $240,000) 17 (Land Allocation - $5,000) 18 (Design and Contingencies - $125,000) 19 (15) Jackson Township, T-605 over Branch 20 of Harvey's Creek, Bridge Replacement 395,000 21 (Base Construction Allocation - 22 $265,000) 23 (Land Allocation - $5,000) 24 (Design and Contingencies - $125,000) 25 (16) Jackson Township, County Road No.13 26 over Toby's Creek, Bridge Replacement 395,000 27 (Base Construction Allocation - 28 $265,000) 29 (Land Allocation - $5,000) 30 (Design and Contingencies - $125,000) 19990S0504B1019 - 388 -
1 (17) Lake Township, T-796 over Beaver Run 2 Creek, Bridge Replacement 410,000 3 (Base Construction Allocation - 4 $280,000) 5 (Land Allocation - $5,000) 6 (Design and Contingencies - $125,000) 7 (18) Lake Township, T-779 over Bryant Pond 8 Outlet, Bridge Replacement 430,000 9 (Base Construction Allocation - 10 $300,000) 11 (Land Allocation - $5,000) 12 (Design and Contingencies - $125,000) 13 (19) Nescopeck Township, T-381 over Branch 14 of Nescopeck Creek, Bridge Replacement 410,000 15 (Base Construction Allocation - 16 $280,000) 17 (Land Allocation - $5,000) 18 (Design and Contingencies - $125,000) 19 (20) Ross Township, T-680 over Huntingdon 20 Creek, Bridge Replacement 410,000 21 (Base Construction Allocation - 22 $280,000) 23 (Land Allocation - $5,000) 24 (Design and Contingencies - $125,000) 25 (21) Ross Township, T-571 over Outlet 26 North Pond, Bridge Replacement 420,000 27 (Base Construction Allocation - 28 $290,000) 29 (Land Allocation - $5,000) 30 (Design and Contingencies - $125,000) 19990S0504B1019 - 389 -
1 (22) Ross Township, T-575 over Huntingdon 2 Creek, Bridge Replacement 455,000 3 (Base Construction Allocation - 4 $325,000) 5 (Land Allocation - $5,000) 6 (Design and Contingencies - $125,000) 7 (23) Ross Township, County Road No.2 over 8 Marsh Creek, Bridge Replacement 440,000 9 (Base Construction Allocation - 10 $310,000) 11 (Land Allocation - $5,000) 12 (Design and Contingencies - $125,000) 13 (24) Sugarloaf Township, T-332 over Branch 14 of Nescopeck Creek, Bridge Replacement 430,000 15 (Base Construction Allocation - 16 $300,000) 17 (Land Allocation - $5,000) 18 (Design and Contingencies - $125,000) 19 (25) Plymouth Township, T-497 over Mud 20 Pond Inlet, Bridge Replacement 405,000 21 (Base Construction Allocation - 22 $275,000) 23 (26) Slocum Township, T-454 over Black 24 Creek, Bridge Replacement 395,000 25 (Base Construction Allocation - 26 $265,000) 27 (Land Allocation - $5,000) 28 (Design and Contingencies - $125,000) 29 (27) Wright Township, County Road No.21 30 over Wapwallopen Creek, Bridge 19990S0504B1019 - 390 -
1 Replacement 395,000 2 (Base Construction Allocation - 3 $265,000) 4 (Land Allocation - $5,000) 5 (Design and Contingencies - $125,000) 6 (28) City of Wilkes-Barre, Stanton Street, 7 Bowman Spring Run Bridge, Intersection 8 of Empire Street, Bridge Replacement 170,000 9 (Base Construction Allocation - 10 $140,000) 11 (Land Allocation - $10,000) 12 (Design and Contingencies - $20,000) 13 (29) Borough of Larksville, Nesbitt Street 14 Bridge, Bridge Replacement 109,000 <-- 15 BRIDGE, BRIDGE REPLACEMENT 150,000 <-- 16 (Base Construction Allocation - 17 $95,000) 18 (Design and Contingencies - $14,000) 19 (b) State Bridges 20 (1) SR 0011, Erie-Lackawanna Railroad 21 Bridge over Erie-Lackawanna Railroad, 22 Plymouth Township, Bridge Removal 185,000 23 (Base Construction Allocation - 24 $150,000) 25 (Land Allocation - $10,000) 26 (Design and Contingencies - $25,000) 27 (2) SR 1030, Harvey's Lake Bridge at 28 Junction of SR 1053, Lake Township, 29 Bridge Replacement 460,000 30 (Base Construction Allocation - 19990S0504B1019 - 391 -
1 $350,000) 2 (Land Allocation - $20,000) 3 (Design and Contingencies - $90,000) 4 (3) SR 3007, Bridge over Wapwallopen 5 Creek, South of SR 3010, Dorrance 6 Township, Bridge Replacement 530,000 7 (Base Construction Allocation - 8 $420,000) 9 (Land Allocation - $10,000) 10 (Design and Contingencies - $100,000) 11 (4) State Bridges, Countywide Bridge Zone 12 Painting, Bridge Painting 370,000 <-- 13 PAINTING, BRIDGE PAINTING 500,000 <-- 14 (Base Construction Allocation - 15 $350,000) 16 (Land Allocation - $10,000) 17 (Design and Contingencies - $10,000) 18 (5) SR 3038, Black Creek Stone Arch 19 Bridge, 0.1 Mile North of SR 3018, 20 Black Creek Township, Bridge 21 Replacement 240,000 22 (Base Construction Allocation - 23 $200,000) 24 (Land Allocation - $10,000) 25 (Design and Contingencies - $30,000) 26 (6) SR 1034, Pikes Creek Bridge, 132 Feet 27 East of TR 11, Lake Township, Bridge 28 Replacement 180,000 29 (Base Construction Allocation - 30 $150,000) 19990S0504B1019 - 392 -
1 (Land Allocation - $10,000) 2 (Design and Contingencies - $20,000) 3 (7) SR 2041, Wright Creek Bridge, 2 Miles 4 North of TR 940, Dennison Township, 5 Bridge Replacement 400,000 6 (Base Construction Allocation - 7 $340,000) 8 (Land Allocation - $10,000) 9 (Design and Contingencies - $50,000) 10 (8) SR 0309, Toby's Creek Bridge over 11 Toby's Creek, Kingston Township, Bridge 12 Replacement 1,276,000 13 (Base Construction Allocation - 14 $1,100,000) 15 (Land Allocation - $11,000) 16 (Design and Contingencies - $165,000) 17 (9) SR 0309, North Cross Valley Dams over 18 Susquehanna River, Plains Township, 19 Bridge Rehabilitation 1,517,000 20 (Base Construction Allocation - 21 $1,377,000) 22 (Design and Contingencies - $140,000) 23 (10) SR 0415, Harveys Lake Inlet Bridge 24 No.2 over Harveys Lake Inlet, Harveys 25 Lake Borough, Bridge Replacement 345,000 26 (Base Construction Allocation - 27 $260,000) 28 (Land Allocation - $10,000) 29 (Design and Contingencies - $75,000) 30 (11) SR 2036, BALD MOUNTAIN ROAD BRIDGE <-- 19990S0504B1019 - 393 -
1 OVER BEAR CREEK, BEAR CREEK TOWNSHIP, 2 BRIDGE REHABILITATION 220,000 3 (BASE CONSTRUCTION ALLOCATION - 4 $200,000) 5 (LAND ALLOCATION - $5,000) 6 (DESIGN AND CONTINGENCIES - $15,000) 7 Section 45. Lycoming County. 8 (a) Local Bridges 9 (1) Mifflin Township, T-651 over Larry's 10 Creek, Bridge Replacement 528,000 11 (Base Construction Allocation - 12 $438,000) 13 (Land Allocation - $20,000) 14 (Design and Contingencies - $70,000) 15 (2) McIntyre Township, T-667, Rolston 16 Bridge over Lycoming Creek, Bridge 17 Replacement 1,620,000 18 (Base Construction Allocation - 19 $1,400,000) 20 (Land Allocation - $20,000) 21 (Design and Contingencies - $200,000) 22 (3) Franklin Township, T-710, Bridge over 23 Beaver Run, Bridge Replacement 265,000 24 (Base Construction Allocation - 25 $212,000) 26 (Land Allocation - $40,000) 27 (Design and Contingencies - $13,000) 28 (4) Piatt Township, T-365, Bridge over 29 Larry's Creek, Bridge Replacement 1,251,000 30 (Base Construction Allocation - 19990S0504B1019 - 394 -
1 $1,039,000) 2 (Land Allocation - $30,000) 3 (Design and Contingencies - $182,000) 4 (5) McIntyre Township, T-673, Bridge over 5 Lycoming Creek, Bridge Replacement 902,000 6 (Base Construction Allocation - 7 $744,000) 8 (Land Allocation - $23,000) 9 (Design and Contingencies - $135,000) 10 (6) Shrewsbury Township, T-686, Bridge 11 over Rock Run, Bridge Replacement 288,000 12 (Base Construction Allocation - 13 $238,000) 14 (Land Allocation - $7,000) 15 (Design and Contingencies - $43,000) 16 (7) Piatt Township, T-343, Bridge over 17 Pine Run, Bridge Replacement 353,000 18 (Base Construction Allocation - 19 $291,000) 20 (Land Allocation - $9,000) 21 (Design and Contingencies - $53,000) 22 (8) Washington Township, T-397, Bridge 23 over Deer Hole Creek, Bridge 24 Replacement 517,000 25 (Base Construction Allocation - 26 $426,000) 27 (Land Allocation - $13,000) 28 (Design and Contingencies - $78,000) 29 (9) South Williamsport Borough, East 30 Central Avenue, Bridge over Hagermans 19990S0504B1019 - 395 -
1 Run, Bridge Replacement 519,000 2 (Base Construction Allocation - 3 $428,000) 4 (Land Allocation - $13,000) 5 (Design and Contingencies - $78,000) 6 (10) Moreland Township, T-443, Bridge over 7 Little Muncy Creek, Bridge Replacement 780,000 8 (Base Construction Allocation - 9 $630,000) 10 (Land Allocation - $20,000) 11 (Design and Contingencies - $130,000) 12 (11) Muncy Creek Township, T-437, Bridge 13 over Branch of Muncy Creek, Bridge 14 Replacement 335,000 15 (Base Construction Allocation - 16 $268,000) 17 (Land Allocation - $17,000) 18 (Design and Contingencies - $50,000) 19 (12) Muncy Creek Township, T-811, Bridge 20 over Wolf Run, Bridge Replacement 150,000 21 (Base Construction Allocation - 22 $120,000) 23 (Land Allocation - $10,000) 24 (Design and Contingencies - $20,000) 25 (13) Pine Township, T-782, Lycoming County 26 Bridge No.109 over Texas Creek, Bridge 27 Replacement 537,000 28 (Base Construction Allocation - 29 $426,000) 30 (Land Allocation - $6,000) 19990S0504B1019 - 396 -
1 (Design and Contingencies - $105,000) 2 (14) LYCOMING TOWNSHIP, T-688, HORN ROAD <-- 3 BRIDGE OVER LITTLE GAP RUN, BRIDGE 4 REPLACEMENT 310,000 5 (BASE CONSTRUCTION ALLOCATION - 6 $185,000) 7 (LAND ALLOCATION - $25,000) 8 (DESIGN AND CONTINGENCIES - $100,000) 9 (15) PENN TOWNSHIP, T-521, BRIDGE OVER 10 SUGAR RUN, BRIDGE REPLACEMENT 355,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $225,000) 13 (LAND ALLOCATION - $50,000) 14 (DESIGN AND CONTINGENCIES - $80,000) 15 (16) SHREWSBURY TOWNSHIP, T-650, IRON 16 BRIDGE OVER MUNCY CREEK, BRIDGE 17 REPLACEMENT 880,000 18 (BASE CONSTRUCTION ALLOCATION - 19 $750,000) 20 (LAND ALLOCATION - $20,000) 21 (DESIGN AND CONTINGENCIES - $110,000) 22 (17) WASHINGTON TOWNSHIP, T-424, BRIDGE 23 OVER WHITE DEER HOLE CREEK, BRIDGE 24 REPLACEMENT 380,000 25 (18) WOLF TOWNSHIP, T-270, BRIDGE OVER 26 GREGS RUN, BRIDGE REPLACEMENT 500,000 27 (19) WOODWARD TOWNSHIP, T-367, BRIDGE OVER 28 QUENSHUKENY RUN, BRIDGE REPLACEMENT 480,000 29 (20) WOODWARD TOWNSHIP, T-369, BRIDGE OVER 30 QUENSHUKENY RUN, BRIDGE REPLACEMENT 500,000 19990S0504B1019 - 397 -
1 (b) State Bridges 2 (1) SR 0220, Quenshukeny Run Bridge over 3 Quenshukeny Run, Village of Linden, 4 Bridge Replacement 395,000 5 (Base Construction Allocation - 6 $316,000) 7 (Land Allocation - $20,000) 8 (Design and Contingencies - $59,000) 9 (2) SR 0973, Bridge over Hoagland Run, 3 10 Miles West of Cogan Station, Bridge 11 Rehabilitation 195,000 12 (Base Construction Allocation - 13 $156,000) 14 (Land Allocation - $10,000) 15 (Design and Contingencies - $29,000) 16 (3) SR 1006, Wallis Run Bridge over Wallis 17 Run, Cascade Township, Bridge 18 Replacement 65,000 19 (Base Construction Allocation - 20 $50,000) 21 (Land Allocation - $5,000) 22 (Design and Contingencies - $10,000) 23 (4) SR 2022, Mill Creek Bridge, North of 24 Montoursville, Bridge Replacement 668,000 25 (Base Construction Allocation - 26 $575,000) 27 (Land Allocation - $43,000) 28 (Design and Contingencies - $50,000) 29 (5) SR 2051, Wolf Run Bridge over Wolf 30 Run, South of SR 0220, Muncy Township, 19990S0504B1019 - 398 -
1 Bridge Replacement 638,000 2 (Base Construction Allocation - 3 $510,000) 4 (Land Allocation - $32,000) 5 (Design and Contingencies - $96,000) 6 (6) SR 3024, Jobs Run Road Bridge over 7 Tributary of Larrys Creek, East of 8 Salladasburg, Bridge Replacement 108,000 9 (Base Construction Allocation - 10 $92,000) 11 (Land Allocation - $8,000) 12 (Design and Contingencies - $8,000) 13 (7) SR 3028, West 4th Street, Lycoming 14 Creek Bridge, City of Williamsport, 15 Bridge Rehabilitation 216,000 16 (Base Construction Allocation - 17 $185,000) 18 (Land Allocation - $15,000) 19 (Design and Contingencies - $16,000) 20 (8) SR 0044, Bridge over Conrail, Bridge 21 Painting 210,000 22 (Base Construction Allocation - 23 $200,000) 24 (Design and Contingencies - $10,000) 25 (9) SR 0180, I-180 Eastbound Bridge over 26 Loyalsock Creek, Bridge Painting 135,000 27 (Base Construction Allocation - 28 $125,000) 29 (Design and Contingencies - $10,000) 30 (10) SR 0180, I-180 Westbound Bridge over 19990S0504B1019 - 399 -
1 Loyalsock Creek, Bridge Painting 135,000 2 (Base Construction Allocation - 3 $125,000) 4 (Design and Contingencies - $10,000) 5 (11) SR 2014, Bridge over Lycoming Creek, 6 Bridge Painting 780,000 7 (Base Construction Allocation - 8 $770,000) 9 (Design and Contingencies - $10,000) 10 (12) SR 2061, Bridge over Little Muncy 11 Creek, Bridge Painting 80,000 12 (Base Construction Allocation - 13 $70,000) 14 (Design and Contingencies - $10,000) 15 (13) SR 0014, SR 0014 over Trout Run, 16 Lewis Township, Bridge Replacement 640,000 17 (Base Construction Allocation - 18 $512,000) 19 (Land Allocation - $32,000) 20 (Design and Contingencies - $96,000) 21 (14) SR 0044, SR 0044 over Ramsey Run, 22 Cummings Township, Bridge Replacement 394,000 23 (Base Construction Allocation - 24 $315,000) 25 (Land Allocation - $20,000) 26 (Design and Contingencies - $59,000) 27 (15) SR 0044, SR 0044 over Pine Bottom 28 Run, Cummings Township, Bridge 29 Replacement 360,000 30 (Base Construction Allocation - 19990S0504B1019 - 400 -
1 $288,000) 2 (Land Allocation - $18,000) 3 (Design and Contingencies - $54,000) 4 (16) SR 0118, SR 0118 over Big Run, 5 Franklin Township, Bridge Replacement 382,000 6 (Base Construction Allocation - 7 $307,000) 8 (Land Allocation - $19,000) 9 (Design and Contingencies - $56,000) 10 (17) SR 0284, SR 0284 over Blacks Creek, 11 Pine Township, Bridge Replacement 700,000 12 (Base Construction Allocation - 13 $570,000) 14 (Land Allocation - $30,000) 15 (Design and Contingencies - $100,000) 16 (18) SR 0405, SR 0405 over West Branch of 17 Susquehanna River, Muncy Creek 18 Township, Bridge Replacement 24,924,000 19 (Base Construction Allocation - 20 $19,939,000) 21 (Land Allocation - $1,246,000) 22 (Design and Contingencies - $3,739,000) 23 (19) SR 0654, SR 0654 over Mosquito Creek, 24 Anthony Township, Bridge Replacement 674,000 25 (Base Construction Allocation - 26 $539,000) 27 (Land Allocation - $34,000) 28 (Design and Contingencies - $101,000) 29 (20) SR 0973, SR 0973 over Mud Run, 30 Mifflin Township, Bridge Replacement 294,000 19990S0504B1019 - 401 -
1 (Base Construction Allocation - 2 $252,000) 3 (Land Allocation - $20,000) 4 (Design and Contingencies - $22,000) 5 (21) SR 1005, SR 1005 over Plunketts 6 Creek, Plunketts Creek Township, Bridge 7 Replacement 366,000 8 (Base Construction Allocation - 9 $293,000) 10 (Land Allocation - $18,000) 11 (Design and Contingencies - $55,000) 12 (22) SR 2061, SR 2061 over Sugar Run, 13 Moreland Township, Bridge Replacement 443,000 14 (Base Construction Allocation - 15 $354,000) 16 (Land Allocation - $22,000) 17 (Design and Contingencies - $67,000) 18 (23) SR 2085, SR 2085 over Muncy Creek, 19 Penn Township, Bridge Replacement 1,050,000 20 (Base Construction Allocation - 21 $840,000) 22 (Land Allocation - $53,000) 23 (Design and Contingencies - $157,000) 24 (24) SR 0405, East Water Street over Glade 25 Run, Muncy Borough, Bridge Replacement 500,000 26 (Base Construction Allocation - 27 $350,000) 28 (Land Allocation - $50,000) 29 (Design and Contingencies - $100,000) 30 (25) SR 1003, Bridge over Wallis Run, 19990S0504B1019 - 402 -
1 Gamble Township, Bridge Replacement 1,020,000 2 (Base Construction Allocation - 3 $820,000) 4 (Land Allocation - $50,000) 5 (Design and Contingencies - $150,000) 6 (26) SR 1003, Bridge over Salt Run, Gamble 7 Township, Bridge Replacement 390,000 8 (Base Construction Allocation - 9 $300,000) 10 (Land Allocation - $30,000) 11 (Design and Contingencies - $60,000) 12 (27) US 15, Bridge over 2nd Avenue, South 13 Williamsport Borough, Bridge 14 Replacement 1,550,000 15 (Base Construction Allocation - 16 $1,250,000) 17 (Land Allocation - $50,000) 18 (Design and Contingencies - $250,000) 19 (28) SR 44, Bridge over Conrail, Nippenose 20 Township, Bridge Replacement 2,425,000 21 (Base Construction Allocation - 22 $2,000,000) 23 (Land Allocation - $100,000) 24 (Design and Contingencies - $325,000) 25 (29) US 220, Southbound Bridge over SR 26 3005, Jersey Shore Borough, Deck 27 Replacement 275,000 28 (Base Construction Allocation - 29 $225,000) 30 (Design and Contingencies - $50,000) 19990S0504B1019 - 403 -
1 (30) US 220, Northbound Bridge over 2 Railroad, Porter Township, Bridge 3 Replacement 900,000 4 (Base Construction Allocation - 5 $750,000) 6 (Design and Contingencies - $150,000) 7 (31) US 220, Southbound Bridge over 8 Railroad, Porter Township, Bridge 9 Rehabilitation 900,000 10 (Base Construction Allocation - 11 $750,000) 12 (Design and Contingencies - $150,000) 13 (32) US 220, Northbound Bridge over SR 14 3005, Jersey Shore Borough, Bridge 15 Rehabilitation 275,000 16 (Base Construction Allocation - 17 $225,000) 18 (Design and Contingencies - $50,000) 19 (33) US 220, Ramp on US 220, Jersey Shore 20 Borough, Deck Replacement 1,500,000 21 (Base Construction Allocation - 22 $1,250,000) 23 (Design and Contingencies - $250,000) 24 (34) US 220, Northbound Bridge over Ramp 25 A, Woodward Township, Bridge 26 Rehabilitation 550,000 27 (Base Construction Allocation - 28 $500,000) 29 (Design and Contingencies - $50,000) 30 (35) US 220, Northbound Bridge over T-331, 19990S0504B1019 - 404 -
1 Woodward Township, Bridge 2 Rehabilitation 275,000 3 (Base Construction Allocation - 4 $250,000) 5 (Design and Contingencies - $25,000) 6 (36) US 220, Northbound Bridge over 7 Railroad, Woodward Township, Bridge 8 Rehabilitation 825,000 9 (Base Construction Allocation - 10 $750,000) 11 (Design and Contingencies - $75,000) 12 (37) US 220, Southbound Bridge over Ramp, 13 Woodward Township, Bridge 14 Rehabilitation 550,000 15 (Base Construction Allocation - 16 $500,000) 17 (Design and Contingencies - $50,000) 18 (38) US 220, Southbound Bridge over T-331, 19 Woodward Township, Bridge 20 Rehabilitation 275,000 21 (Base Construction Allocation - 22 $250,000) 23 (Design and Contingencies - $25,000) 24 (39) US 220, Southbound Bridge over 25 Railroad, Woodward Township, Bridge 26 Rehabilitation 825,000 27 (Base Construction Allocation - 28 $750,000) 29 (Design and Contingencies - $75,000) 30 (40) US 220, Reach Road over US 220, City 19990S0504B1019 - 405 -
1 of Williamsport, Deck Replacement 1,400,000 2 (Base Construction Allocation - 3 $1,250,000) 4 (Design and Contingencies - $150,000) 5 (41) US 220, Northbound Bridge over Arch 6 Street, City of Williamsport, Bridge 7 Rehabilitation 385,000 8 (Base Construction Allocation - 9 $350,000) 10 (Design and Contingencies - $35,000) 11 (42) US 220, Southbound Bridge over Arch 12 Street, City of Williamsport, Bridge 13 Rehabilitation 385,000 14 (Base Construction Allocation - 15 $350,000) 16 (Design and Contingencies - $35,000) 17 (43) US 220, Northbound Bridge over 18 Lycoming Creek, City of Williamsport, 19 Bridge Rehabilitation 1,100,000 20 (Base Construction Allocation - 21 $1,000,000) 22 (Design and Contingencies - $100,000) 23 (44) I-180, Eastbound Bridge over Maynard 24 Street, City of Williamsport, Bridge 25 Widening and Deck Replacement 950,000 26 (Base Construction Allocation - 27 $800,000) 28 (Design and Contingencies - $150,000) 29 (45) I-180, Westbound Bridge over Maynard 30 Street, City of Williamsport, Bridge 19990S0504B1019 - 406 -
1 Widening and Deck Replacement 950,000 2 (Base Construction Allocation - 3 $800,000) 4 (Design and Contingencies - $150,000) 5 (46) I-180, Eastbound and Westbound 6 Bridges over Railroad, City of 7 Williamsport, Bridge Widening and Deck 8 Replacement 900,000 9 (Base Construction Allocation - 10 $750,000) 11 (Design and Contingencies - $150,000) 12 (47) I-180, Eastbound Bridge over Hepburn 13 Street, City of Williamsport, Bridge 14 Widening and Deck Replacement 1,200,000 15 (Base Construction Allocation - 16 $1,000,000) 17 (Design and Contingencies - $200,000) 18 (48) I-180, Westbound Bridge over Hepburn 19 Street, City of Williamsport, Bridge 20 Widening and Deck Replacement 1,200,000 21 (Base Construction Allocation - 22 $1,000,000) 23 (Design and Contingencies - $200,000) 24 (49) I-180, Eastbound Bridge over Basin 25 Street, City of Williamsport, Bridge 26 Rehabilitation 550,000 27 (Base Construction Allocation - 28 $500,000) 29 (Design and Contingencies - $50,000) 30 (50) I-180, Westbound Bridge over Basin 19990S0504B1019 - 407 -
1 Street, City of Williamsport, Bridge 2 Rehabilitation 550,000 3 (Base Construction Allocation - 4 $500,000) 5 (Design and Contingencies - $50,000) 6 (51) I-180, Eastbound and Westbound 7 Bridges over Muncy Creek, Muncy Creek 8 Township, Bridge Rehabilitation 1,100,000 9 (Base Construction Allocation - 10 $1,000,000) 11 (Design and Contingencies - $100,000) 12 (52) I-180, Eastbound and Westbound 13 Bridges over PA 405, Muncy Creek 14 Township, Bridge Rehabilitation 1,100,000 15 (Base Construction Allocation - 16 $1,000,000) 17 (Design and Contingencies - $100,000) 18 (53) I-180, Eastbound Bridge over SR 4024, 19 Muncy Creek Township, Bridge 20 Rehabilitation 550,000 21 (Base Construction Allocation - 22 $500,000) 23 (Design and Contingencies - $50,000) 24 (54) I-180, Eastbound and Westbound 25 Bridges over SR 2061, Muncy Creek 26 Township, Bridge Rehabilitation 660,000 27 (Base Construction Allocation - 28 $600,000) 29 (Design and Contingencies - $60,000) 30 (55) I-180, Eastbound and Westbound 19990S0504B1019 - 408 -
1 Bridges over SR 2014, Muncy Creek 2 Township, Bridge Rehabilitation 660,000 3 (Base Construction Allocation - 4 $600,000) 5 (Design and Contingencies - $60,000) 6 (56) SR 0180, I-180 Bridge over Loyalsock 7 Creek, Loyalsock Township and 8 Montoursville Borough, Bridge 9 Rehabilitation 800,000 10 (Base Construction Allocation - 11 $750,000) 12 (Design and Contingencies - $50,000) 13 (57) SR 0973, Hoagland Run Bridge over 14 Hoagland Run, Lycoming Township, Bridge 15 Replacement 620,000 16 (Base Construction Allocation - 17 $500,000) 18 (Land Allocation - $20,000) 19 (Design and Contingencies - $100,000) 20 (58) SR 2039, Mill Creek Bridge over Mill 21 Creek, Loyalsock Township, Bridge 22 Replacement 840,000 23 (Base Construction Allocation - 24 $680,000) 25 (Land Allocation - $30,000) 26 (Design and Contingencies - $130,000) 27 (59) SR 8028, Ramp Bridge over Ramp N, 28 Platt Township, Bridge Deck 29 Replacement 1,500,000 30 (Base Construction Allocation - 19990S0504B1019 - 409 -
1 $1,400,000) 2 (Design and Contingencies - $100,000) 3 (60) I-180, HALLS STATION TO <-- 4 NORTHUMBERLAND COUNTY LINE, MUNCY CREEK 5 TOWNSHIP, 11 STRUCTURES, BRIDGE 6 REHABILITATION 3,400,000 7 (BASE CONSTRUCTION ALLOCATION - 8 $3,200,000) 9 (DESIGN AND CONTINGENCIES - $200,000) 10 (61) SR 2049 OVER I-180, BRIDGE 11 REHABILITATION 3,000,000 12 (BASE CONSTRUCTION ALLOCATION - 13 $2,500,000) 14 (DESIGN AND CONTINGENCIES - $500,000) 15 (62) VARIOUS BRIDGES REHABILITATION 382,000 16 Section 46. McKean County. 17 (a) Local Bridges 18 (1) Foster Township, T-359, Garlock Hollow 19 Bridge over Kendall Creek, Bridge 20 Replacement 580,000 21 (Base Construction Allocation - 22 $400,000) 23 (Land Allocation - $20,000) 24 (Design and Contingencies - $160,000) 25 (b) State Bridges 26 (1) SR 3009, Kinzua Creek Bridge over 27 Kinzua Creek, Borough of Mt. Jewett, 28 Bridge Replacement 880,000 29 (Base Construction Allocation - 30 $700,000) 19990S0504B1019 - 410 -
1 (Land Allocation - $30,000) 2 (Design and Contingencies - $150,000) 3 (2) SR 4005, Kendall Creek Bridge over 4 Kendall Creek, City of Bradford, Bridge 5 Replacement 800,000 6 (Base Construction Allocation - 7 $650,000) 8 (Land Allocation - $50,000) 9 (Design and Contingencies - $100,000) 10 (3) SR 9900, Kings Run Bridge over Kings 11 Run, Ceres Township, Bridge 12 Replacement 370,000 13 (Base Construction Allocation - 14 $280,000) 15 (Land Allocation - $10,000) 16 (Design and Contingencies - $80,000) 17 (4) SR 1002, Annin Creek Bridge, Annin 18 Township, Bridge Replacement 468,000 19 (Base Construction Allocation - 20 $373,000) 21 (Land Allocation - $15,000) 22 (Design and Contingencies - $80,000) 23 (5) SR 0006, Bridge over Potato Creek, 24 Keating Township, Bridge Replacement 300,000 25 (Base Construction Allocation - 26 $240,000) 27 (Land Allocation - $20,000) 28 (Design and Contingencies - $40,000) 29 (6) SR 0646, Pennbrook Run Bridge over 30 Pennbrook Run, Village of Gilmore, 19990S0504B1019 - 411 -
1 Foster Township, Bridge Replacement 114,000 2 (Base Construction Allocation - 3 $90,000) 4 (Land Allocation - $4,000) 5 (Design and Contingencies - $20,000) 6 (7) SR 1002, Potato Creek Bridge over 7 Potato Creek, Keating Township, Bridge 8 Painting 410,000 9 (Base Construction Allocation - 10 $400,000) 11 (Design and Contingencies - $10,000) 12 Section 47. Mercer County. 13 (a) Local Bridges 14 (1) City of Sharon, Service Avenue Bridge 15 over Pine Run, Bridge Replacement 240,000 16 (Base Construction Allocation - 17 $210,000) 18 (Land Allocation - $5,000) 19 (Design and Contingencies - $25,000) 20 (2) City of Sharon, Wengler Avenue Bridge 21 over Pine Hollow Run, Bridge 22 Replacement 218,000 23 (Base Construction Allocation - 24 $193,000) 25 (Land Allocation - $5,000) 26 (Design and Contingencies - $20,000) 27 (3) Pine Township, T-355, Pinchlong Road 28 Bridge over Swamp Run, Bridge 29 Replacement 203,000 30 (Base Construction Allocation - 19990S0504B1019 - 412 -
1 $178,000) 2 (Land Allocation - $5,000) 3 (Design and Contingencies - $20,000) 4 (4) Pine Township, T-878, Diamond Road 5 Bridge over Wolf Creek, Bridge 6 Replacement 1,813,000 7 (Base Construction Allocation - 8 $1,668,000) 9 (Land Allocation - $60,000) 10 (Design and Contingencies - $85,000) 11 (5) Pine Township, T-413, Daugherty Road 12 Bridge over Wolf Run, Bridge 13 Replacement 407,000 14 (Base Construction Allocation - 15 $352,000) 16 (Land Allocation - $15,000) 17 (Design and Contingencies - $40,000) 18 (6) Shenango Township, T-955, Oak Hill 19 Road Bridge over Turkey Run, Bridge 20 Replacement 297,000 21 (Base Construction Allocation - 22 $257,000) 23 (Land Allocation - $10,000) 24 (Design and Contingencies - $30,000) 25 (7) Shenango Township, Heasley Road Bridge 26 over Tributary of Shenango River, 27 Bridge Replacement 173,000 28 (Base Construction Allocation - 29 $155,000) 30 (Land Allocation - $3,000) 19990S0504B1019 - 413 -
1 (Design and Contingencies - $15,000) 2 (8) Springfield Township, T-722, Spring 3 Road Bridge over Mill Run, Bridge 4 Replacement 230,000 5 (Base Construction Allocation - 6 $200,000) 7 (Land Allocation - $5,000) 8 (Design and Contingencies - $25,000) 9 (9) Worth Township, T-912, Jack Atwell 10 Road Bridge over Wolf Creek, Bridge 11 Replacement 297,000 12 (Base Construction Allocation - 13 $257,000) 14 (Land Allocation - $10,000) 15 (Design and Contingencies - $30,000) 16 (10) Springfield Township, North Spring 17 Road Bridge, Bridge Replacement 245,000 18 (Base Construction Allocation - 19 $210,000) 20 (Land Allocation - $5,000) 21 (Design and Contingencies - $30,000) 22 (11) Delaware Township, T-634, Redfoot 23 Road Bridge over Otter Creek, Bridge 24 Replacement 220,000 25 (Base Construction Allocation - 26 $185,000) 27 (Land Allocation - $5,000) 28 (Design and Contingencies - $30,000) 29 (12) Fairview Township, T-623, Runkle Lane 30 Bridge over Coolspring Creek, Bridge 19990S0504B1019 - 414 -
1 Replacement 220,000 2 (Base Construction Allocation - 3 $185,000) 4 (Land Allocation - $5,000) 5 (Design and Contingencies - $30,000) 6 (13) City of Hermitage, T-307, Lynnwood 7 Drive Bridge over Bobby Run, Bridge 8 Replacement 244,000 9 (Base Construction Allocation - 10 $210,000) 11 (Land Allocation - $3,000) 12 (Design and Contingencies - $31,000) 13 (14) SHARON CITY, PRINDLE STREET BRIDGE <-- 14 OVER PINE RUN, BRIDGE REPLACEMENT 485,000 15 (BASE CONSTRUCTION ALLOCATION - 16 $405,000) 17 (LAND ALLOCATION - $20,000) 18 (DESIGN AND CONTINGENCIES - $60,000) 19 (b) State Bridges 20 (1) SR 0058, SR 0058 over Sugar Creek, 21 Greene Township, Bridge Replacement 270,000 22 (Base Construction Allocation - 23 $200,000) 24 (Land Allocation - $20,000) 25 (Design and Contingencies - $50,00) 26 (2) SR 0058, SR 0058 over Tributary of 27 Shenango River, Greenville Borough, 28 Bridge Replacement 250,000 29 (Base Construction Allocation - 30 $200,000) 19990S0504B1019 - 415 -
1 (Land Allocation - $20,000) 2 (Design and Contingencies - $30,000) 3 (3) SR 0058, SR 0058 over I-79, Findley 4 Township, Bridge Replacement 1,630,000 5 (Base Construction Allocation - 6 $1,500,000) 7 (Land Allocation - $30,000) 8 (Design and Contingencies - $100,000) 9 (4) SR 0062, SR 0062 over Shenango 10 River/Riverside Drive, City of Sharon, 11 Bridge Replacement 2,780,000 12 (Base Construction Allocation - 13 $2,500,000) 14 (Land Allocation - $30,000) 15 (Design and Contingencies - $250,000) 16 (5) SR 0158, SR 0158 over Little 17 Neshannock Creek, Wilmington Township, 18 Bridge Replacement 770,000 19 (Base Construction Allocation - 20 $650,000) 21 (Land Allocation - $40,000) 22 (Design and Contingencies - $80,000) 23 (6) SR 0173, SR 0173 over Mill Creek, New 24 Lebanon Borough, Bridge Replacement 430,000 25 (Base Construction Allocation - 26 $350,000) 27 (Land Allocation - $20,000) 28 (Design and Contingencies - $60,000) 29 (7) SR 0208, SR 0208 over Wolf Creek, 30 Grove City Borough, Bridge Replacement 1,000,000 19990S0504B1019 - 416 -
1 (Base Construction Allocation - 2 $870,000) 3 (Land Allocation - $30,000) 4 (Design and Contingencies - $100,000) 5 (8) SR 0258, SR 0258 over Daley Run, 6 Jefferson Township, Bridge Replacement 430,000 7 (Base Construction Allocation - 8 $350,000) 9 (Land Allocation - $20,000) 10 (Design and Contingencies - $60,000) 11 (9) SR 0318, SR 0318 over Shenango 12 River/Street/Railroad, West Middlesex 13 Borough, Bridge Replacement 4,400,000 14 (Base Construction Allocation - 15 $3,700,000) 16 (Land Allocation - $100,000) 17 (Design and Contingencies - $600,000) 18 (10) SR 0518, SR 0518 over Pine Hollow 19 Run, City of Hermitage, Bridge 20 Replacement 410,000 21 (Base Construction Allocation - 22 $300,000) 23 (Land Allocation - $30,000) 24 (Design and Contingencies - $80,000) 25 (11) SR 0846, SR 0846 over Shenango 26 Reservoir, South Pymatuning Township, 27 Bridge Replacement 1,500,000 28 (Base Construction Allocation - 29 $1,340,000) 30 (Land Allocation - $10,000) 19990S0504B1019 - 417 -
1 (Design and Contingencies - $150,000) 2 (12) SR 2006, SR 2006 over I-79, 3 Springfield Township, Bridge 4 Replacement 1,100,000 5 (Base Construction Allocation - 6 $1,000,000) 7 (Land Allocation - $10,000) 8 (Design and Contingencies - $90,000) 9 (13) SR 2014, SR 2014 over Mill Creek, 10 Findley Township, Bridge Replacement 330,000 11 (Base Construction Allocation - 12 $240,000) 13 (Land Allocation - $20,000) 14 (Design and Contingencies - $70,000) 15 (14) SR 2025, SR 2025 over Lake Barmore 16 Outlet, Pine Township, Bridge 17 Replacement 300,000 18 (Base Construction Allocation - 19 $230,000) 20 (Land Allocation - $10,000) 21 (Design and Contingencies - $60,000) 22 (15) SR 3011, SR 3011 over I-80, Shenango 23 Township, Bridge Replacement 810,000 24 (Base Construction Allocation - 25 $700,000) 26 (Land Allocation - $10,000) 27 (Design and Contingencies - $100,000) 28 (16) SR 4014, SR 4014 over Shenango River, 29 Delaware Township, Bridge Replacement 920,000 30 (Base Construction Allocation - 19990S0504B1019 - 418 -
1 $800,000) 2 (Land Allocation - $20,000) 3 (Design and Contingencies - $100,000) 4 (17) SR 0518, PA 516 (Walnut Street) 5 Bridge over Pine Hollow Road, City of 6 Hermitage, Bridge Replacement 550,000 7 (Base Construction Allocation - 8 $500,000) 9 (Design and Contingencies - $50,000) 10 (18) SR 4003, Wasser Bridge Road Bridge 11 over Shenango River, West Salem 12 Township, Bridge Replacement 1,620,000 13 (Base Construction Allocation - 14 $1,500,000) 15 (Land Allocation - $40,000) 16 (Design and Contingencies - $80,000) 17 (19) SR 0080, BRIDGES OVER WOLF CREEK, <-- 18 WOLF CREEK TOWNSHIP, BRIDGE 19 REHABILITATION 2,120,000 20 (BASE CONSTRUCTION ALLOCATION - 21 $2,000,000) 22 (LAND ALLOCATION - $20,000) 23 (DESIGN AND CONTINGENCIES - $100,000) 24 (20) SR 0080, BRIDGES OVER T-998, WOLF 25 CREEK TOWNSHIP, BRIDGE REHABILITATION 2,120,000 26 (BASE CONSTRUCTION ALLOCATION - 27 $2,000,000) 28 (LAND ALLOCATION - $20,000) 29 (DESIGN AND CONTINGENCIES - $100,000) 30 (21) SR 0208, BRIDGE OVER I-79, 19990S0504B1019 - 419 -
1 SPRINGFIELD TOWNSHIP, BRIDGE 2 REPLACEMENT 4,000,000 3 (BASE CONSTRUCTION ALLOCATION - 4 $3,600,000) 5 (LAND ALLOCATION - $200,000) 6 (DESIGN AND CONTINGENCIES - $200,000) 7 (22) SR 2007, BRIDGE OVER MILL CREEK, 8 FINDLEY TOWNSHIP, BRIDGE REPLACEMENT 200,000 9 (BASE CONSTRUCTION ALLOCATION - 10 $100,000) 11 (LAND ALLOCATION - $20,000) 12 (DESIGN AND CONTINGENCIES - $80,000) 13 (23) SR 2009, BRIDGE OVER WOLF CREEK, WOLF 14 CREEK TOWNSHIP, BRIDGE REPLACEMENT 600,000 15 (BASE CONSTRUCTION ALLOCATION - 16 $500,000) 17 (LAND ALLOCATION - $20,000) 18 (DESIGN AND CONTINGENCIES - $80,000) 19 (24) SR 2009, BRIDGE OVER CENTERTOWN RUN, 20 WOLF CREEK TOWNSHIP, BRIDGE 21 REPLACEMENT 500,000 22 (BASE CONSTRUCTION ALLOCATION - 23 $400,000) 24 (LAND ALLOCATION - $20,000) 25 (DESIGN AND CONTINGENCIES - $80,000) 26 (25) SR 2013, BRIDGE OVER MUNNEL RUN, 27 MERCER BOROUGH, BRIDGE REPLACEMENT 200,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $100,000) 30 (LAND ALLOCATION - $20,000) 19990S0504B1019 - 420 -
1 (DESIGN AND CONTINGENCIES - $80,000) 2 (26) SR 2016, CHURCH ROAD BRIDGE, FINDLEY 3 TOWNSHIP, BRIDGE REPLACEMENT 400,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $320,000) 6 (LAND ALLOCATION - $20,000) 7 (DESIGN AND CONTINGENCIES - $60,000) 8 (27) SR 2024, BRIDGE OVER WOLF CREEK, 9 WORTH TOWNSHIP, BRIDGE REPLACEMENT 300,000 10 (BASE CONSTRUCTION ALLOCATION - 11 $200,000) 12 (LAND ALLOCATION - $20,000) 13 (DESIGN AND CONTINGENCIES - $80,000) 14 (28) SR 2025, BRIDGE OVER BLACK RUN, 15 LIBERTY TOWNSHIP, BRIDGE REPLACEMENT 500,000 16 (BASE CONSTRUCTION ALLOCATION - 17 $400,000) 18 (LAND ALLOCATION - $20,000) 19 (DESIGN AND CONTINGENCIES - $80,000) 20 (29) SR 3008, BRIDGE OVER SMALL STREAM, 21 HERMITAGE TOWNSHIP, BRIDGE REPLACEMENT 400,000 22 (BASE CONSTRUCTION ALLOCATION - 23 $300,000) 24 (LAND ALLOCATION - $20,000) 25 (DESIGN AND CONTINGENCIES - $80,000) 26 (30) SR 3013, BRIDGE OVER TRIBUTARY OF 27 LITTLE NESHANNOCK CREEK, WILMINGTON 28 TOWNSHIP, BRIDGE REPLACEMENT 200,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $100,000) 19990S0504B1019 - 421 -
1 (LAND ALLOCATION - $20,000) 2 (DESIGN AND CONTINGENCIES - $80,000) 3 (31) SR 3018, BRIDGE OVER SHENANGO RIVER, 4 SHARPSVILLE BOROUGH, BRIDGE 5 REPLACEMENT 4,920,000 6 (BASE CONSTRUCTION ALLOCATION - 7 $4,400,000) 8 (LAND ALLOCATION - $20,000) 9 (DESIGN AND CONTINGENCIES - $500,000) 10 (32) SR 3020, BRIDGE OVER TRIBUTARY OF 11 SHENANGO RIVER, JEFFERSON TOWNSHIP, 12 BRIDGE REPLACEMENT 200,000 13 (BASE CONSTRUCTION ALLOCATION - 14 $100,000) 15 (LAND ALLOCATION - $20,000) 16 (DESIGN AND CONTINGENCIES - $80,000) 17 (33) SR 3020, BRIDGE OVER LACKAWANNOCK 18 CREEK, JEFFERSON TOWNSHIP, BRIDGE 19 REPLACEMENT 300,000 20 (BASE CONSTRUCTION ALLOCATION - 21 $200,000) 22 (LAND ALLOCATION - $20,000) 23 (DESIGN AND CONTINGENCIES - $80,000) 24 (34) SR 3030, BUDD STREET BRIDGE, SHARON 25 TOWNSHIP, BRIDGE REHABILITATION 2,300,000 26 (BASE CONSTRUCTION ALLOCATION - 27 $2,000,000) 28 (LAND ALLOCATION - $50,000) 29 (DESIGN AND CONTINGENCIES - $250,000) 30 (35) SR 4021, BRIDGE OVER MORRISON RUN, 19990S0504B1019 - 422 -
1 PERRY TOWNSHIP, BRIDGE REPLACEMENT 300,000 2 (BASE CONSTRUCTION ALLOCATION - 3 $200,000) 4 (LAND ALLOCATION - $20,000) 5 (DESIGN AND CONTINGENCIES - $80,000) 6 (36) SR 0080, I-80 BRIDGE OVER HOG BACK 7 RUN, SHENANGO TOWNSHIP, BRIDGE 8 REHABILITATION 700,000 9 (BASE CONSTRUCTION ALLOCATION - 10 $550,000) 11 (LAND ALLOCATION - $50,000) 12 (DESIGN AND CONTINGENCIES - $100,000) 13 (37) SR 0080, I-80 EASTBOUND BRIDGE OVER 14 SR 0318, SHENANGO TOWNSHIP, BRIDGE 15 REPLACEMENT 1,100,000 16 (BASE CONSTRUCTION ALLOCATION - 17 $950,000) 18 (LAND ALLOCATION - $50,000) 19 (DESIGN AND CONTINGENCIES - $100,000) 20 (38) SR 0080, I-80 WESTBOUND BRIDGE OVER 21 SR 0318, SHENANGO TOWNSHIP, BRIDGE 22 REPLACEMENT 1,100,000 23 (BASE CONSTRUCTION ALLOCATION - 24 $950,000) 25 (LAND ALLOCATION - $50,000) 26 (DESIGN AND CONTINGENCIES - $100,000) 27 (39) SR 0173, BRIDGE OVER BLACK RUN, WOLF 28 CREEK TOWNSHIP, BRIDGE REPLACEMENT 400,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $300,000) 19990S0504B1019 - 423 -
1 (LAND ALLOCATION - $20,000) 2 (DESIGN AND CONTINGENCIES - $80,000) 3 (40) SR 0173, BRIDGE OVER SANDY CREEK, 4 SANDY LAKE BOROUGH, BRIDGE REPLACEMENT 1,420,000 5 (BASE CONSTRUCTION ALLOCATION - 6 $1,200,000) 7 (LAND ALLOCATION - $20,000) 8 (DESIGN AND CONTINGENCIES - $200,000) 9 (41) SR 0208, BRIDGE OVER I-79, 10 SPRINGFIELD TOWNSHIP, BRIDGE 11 REPLACEMENT 2,920,000 12 (BASE CONSTRUCTION ALLOCATION - 13 $2,500,000) 14 (LAND ALLOCATION - $20,000) 15 (DESIGN AND CONTINGENCIES - $400,000) 16 (42) SR 0258, BRIDGE OVER TINKERS RUN, 17 LIBERTY TOWNSHIP, BRIDGE REPLACEMENT 200,000 18 (BASE CONSTRUCTION ALLOCATION - 19 $100,000) 20 (LAND ALLOCATION - $20,000) 21 (DESIGN AND CONTINGENCIES - $80,000) 22 (43) SR 0318, BRIDGE OVER SR 0060, 23 SHENANGO TOWNSHIP, BRIDGE REPLACEMENT 2,700,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $2,400,000) 26 (LAND ALLOCATION - $50,000) 27 (DESIGN AND CONTINGENCIES - $250,000) 28 (44) SR 0358, BRIDGE OVER TRIBUTARY OF 29 LITTLE SHENANGO RIVER, OTTER CREEK 30 TOWNSHIP, BRIDGE REPLACEMENT 300,000 19990S0504B1019 - 424 -
1 (BASE CONSTRUCTION ALLOCATION - 2 $200,000) 3 (LAND ALLOCATION - $20,000) 4 (DESIGN AND CONTINGENCIES - $80,000) 5 (45) SR 0358, BRIDGE OVER TRIBUTARY OF 6 SHENANGO RIVER, OTTER CREEK TOWNSHIP, 7 BRIDGE REPLACEMENT 200,000 8 (BASE CONSTRUCTION ALLOCATION - 9 $100,000) 10 (LAND ALLOCATION - $20,000) 11 (DESIGN AND CONTINGENCIES - $80,000) 12 (46) SR 0846, BRIDGE OVER CHESTNUT RUN, 13 PYMATUNING TOWNSHIP, BRIDGE 14 REPLACEMENT 400,000 15 (BASE CONSTRUCTION ALLOCATION - 16 $300,000) 17 (LAND ALLOCATION - $20,000) 18 (DESIGN AND CONTINGENCIES - $80,000) 19 (47) SR 1004, BRIDGE OVER COOLSPRING 20 CREEK, FAIRVIEW TOWNSHIP, BRIDGE 21 REPLACEMENT 200,000 22 (BASE CONSTRUCTION ALLOCATION - 23 $100,000) 24 (LAND ALLOCATION - $20,000) 25 (DESIGN AND CONTINGENCIES - $80,000) 26 (48) SR 1011, CARPENTERS CORNER ROAD, 27 BRIDGE NO.1, NEW VERNON TOWNSHIP, 28 BRIDGE REPLACEMENT 400,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $300,000) 19990S0504B1019 - 425 -
1 (LAND ALLOCATION - $20,000) 2 (DESIGN AND CONTINGENCIES - $80,000) 3 (49) SR 1011, CARPENTERS CORNER ROAD, 4 BRIDGE NO.2, PERRY TOWNSHIP, BRIDGE 5 REPLACEMENT 400,000 6 (BASE CONSTRUCTION ALLOCATION - 7 $300,000) 8 (LAND ALLOCATION - $20,000) 9 (DESIGN AND CONTINGENCIES - $80,000) 10 (50) SR 1028, BRIDGE OVER NORTH DEER 11 CREEK, DEER CREEK TOWNSHIP, BRIDGE 12 REPLACEMENT 300,000 13 (BASE CONSTRUCTION ALLOCATION - 14 $200,000) 15 (LAND ALLOCATION - $20,000) 16 (DESIGN AND CONTINGENCIES - $80,000) 17 (51) SR 2001, BRIDGE OVER INDIAN RUN, 18 WILMINGTON TOWNSHIP, BRIDGE 19 REPLACEMENT 200,000 20 (BASE CONSTRUCTION ALLOCATION - 21 $100,000) 22 (LAND ALLOCATION - $20,000) 23 (DESIGN AND CONTINGENCIES - $80,000) 24 (52) SR 2002, BRIDGE OVER NESHANNOCK 25 CREEK, SPRINGFIELD TOWNSHIP, BRIDGE 26 REPLACEMENT 400,000 27 (BASE CONSTRUCTION ALLOCATION - 28 $300,000) 29 (LAND ALLOCATION - $20,000) 30 (DESIGN AND CONTINGENCIES - $80,000) 19990S0504B1019 - 426 -
1 (53) SR 2006, BLACKTOWN ROAD BRIDGE OVER 2 SR 0080, SPRINGFIELD TOWNSHIP, BRIDGE 3 REHABILITATION 2,800,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $2,500,000) 6 (LAND ALLOCATION - $50,000) 7 (DESIGN AND CONTINGENCIES - $250,000) 8 (54) SR 0018, THIEL COLLEGE BRIDGE OVER 9 LITTLE SHENANGO, GREENVILLE BOROUGH, 10 BRIDGE REPLACEMENT 1,021,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $1,000,000) 13 (LAND ALLOCATION - $20,000) 14 (DESIGN AND CONTINGENCIES - $1,000) 15 (55) SR 0058, BRIDGE OVER WOLF CREEK, 16 GROVE CITY BOROUGH, BRIDGE REPLACEMENT 1,420,000 17 (BASE CONSTRUCTION ALLOCATION - 18 $1,200,000) 19 (LAND ALLOCATION - $20,000) 20 (DESIGN AND CONTINGENCIES - $200,000) 21 (56) SR 0060, BRIDGE OVER HEWITT ROAD, 22 SHENANGO TOWNSHIP, BRIDGE REPLACEMENT 1,120,000 23 (BASE CONSTRUCTION ALLOCATION - 24 $1,000,000) 25 (LAND ALLOCATION - $20,000) 26 (DESIGN AND CONTINGENCIES - $100,000) 27 (57) SR 0060, BRIDGE OVER HOG BACK RUN, 28 SHENANGO TOWNSHIP, BRIDGE REPLACEMENT 400,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $300,000) 19990S0504B1019 - 427 -
1 (LAND ALLOCATION - $20,000) 2 (DESIGN AND CONTINGENCIES - $80,000) 3 (58) SR 0060, NORTHBOUND BRIDGE OVER I-80 4 EASTBOUND AND WESTBOUND, SHENANGO 5 TOWNSHIP, BRIDGE REPLACEMENT 3,850,000 6 (BASE CONSTRUCTION ALLOCATION - 7 $3,600,000) 8 (LAND ALLOCATION - $50,000) 9 (DESIGN AND CONTINGENCIES - $200,000) 10 (59) SR 0060, SOUTHBOUND BRIDGE OVER I-80 11 EASTBOUND AND WESTBOUND, SHENANGO 12 TOWNSHIP, BRIDGE REPLACEMENT 3,850,000 13 (BASE CONSTRUCTION ALLOCATION - 14 $3,600,000) 15 (LAND ALLOCATION - $50,000) 16 (DESIGN AND CONTINGENCIES - $200,000) 17 (60) SR 0060, BRIDGE OVER SR 0018, 18 SHENANGO TOWNSHIP, BRIDGE REPLACEMENT 1,800,000 19 (BASE CONSTRUCTION ALLOCATION - 20 $1,600,000) 21 (LAND ALLOCATION - $50,000) 22 (DESIGN AND CONTINGENCIES - $150,000) 23 (61) SR 0062, BRIDGE OVER PINE RUN, SHARON 24 TOWNSHIP, BRIDGE REHABILITATION 200,000 25 (BASE CONSTRUCTION ALLOCATION - 26 $100,000) 27 (LAND ALLOCATION - $20,000) 28 (DESIGN AND CONTINGENCIES - $80,000) 29 (62) SR 0062, BRIDGE OVER PINE RUN, SHARON 30 TOWNSHIP, BRIDGE REPLACEMENT 300,000 19990S0504B1019 - 428 -
1 (BASE CONSTRUCTION ALLOCATION - 2 $200,000) 3 (LAND ALLOCATION - $20,000) 4 (DESIGN AND CONTINGENCIES - $80,000) 5 (63) SR 0062, BRIDGE OVER PINE RUN, SHARON 6 TOWNSHIP, BRIDGE REPLACEMENT 500,000 7 (BASE CONSTRUCTION ALLOCATION - 8 $400,000) 9 (LAND ALLOCATION - $20,000) 10 (DESIGN AND CONTINGENCIES - $80,000) 11 (64) SR 0062, BRIDGE OVER PINE RUN, 12 HERMITAGE TOWNSHIP, BRIDGE REPLACEMENT 300,000 13 (BASE CONSTRUCTION ALLOCATION - 14 $200,000) 15 (LAND ALLOCATION - $20,000) 16 (DESIGN AND CONTINGENCIES - $80,000) 17 (65) SR 0062, BRIDGE OVER PINE RUN, 18 HERMITAGE TOWNSHIP, BRIDGE REPLACEMENT 300,000 19 (BASE CONSTRUCTION ALLOCATION - 20 $200,000) 21 (LAND ALLOCATION - $20,000) 22 (DESIGN AND CONTINGENCIES - $80,000) 23 (66) SR 0062, BRIDGE OVER PINE HOLLOW 24 CREEK, HERMITAGE TOWNSHIP, BRIDGE 25 REPLACEMENT 300,000 26 (BASE CONSTRUCTION ALLOCATION - 27 $200,000) 28 (LAND ALLOCATION - $20,000) 29 (DESIGN AND CONTINGENCIES - $80,000) 30 (67) SR 0062, BRIDGE OVER I-79 NORTHBOUND 19990S0504B1019 - 429 -
1 AND SOUTHBOUND, JACKSON TOWNSHIP, 2 BRIDGE REPLACEMENT 6,720,000 3 (BASE CONSTRUCTION ALLOCATION - 4 $6,000,000) 5 (LAND ALLOCATION - $20,000) 6 (DESIGN AND CONTINGENCIES - $700,000) 7 (68) SR 0079, I-79 BRIDGE OVER PINE RUN, 8 FINDLEY TOWNSHIP, BRIDGE REPLACEMENT 300,000 9 (BASE CONSTRUCTION ALLOCATION - 10 $200,000) 11 (LAND ALLOCATION - $20,000) 12 (DESIGN AND CONTINGENCIES - $80,000) 13 (69) SR 0079, I-79 NORTHBOUND BRIDGE OVER 14 CONRAIL AND YELLOW CREEK, JACKSON 15 TOWNSHIP, BRIDGE REPLACEMENT 300,000 16 (BASE CONSTRUCTION ALLOCATION - 17 $100,000) 18 (LAND ALLOCATION - $50,000,) 19 (DESIGN AND CONTINGENCIES - $150,000) 20 (70) SR 0079, I-79 SOUTHBOUND BRIDGE OVER 21 CONRAIL AND YELLOW CREEK, JACKSON 22 TOWNSHIP, BRIDGE REPLACEMENT 1,200,000 23 (BASE CONSTRUCTION ALLOCATION - 24 $1,000,000) 25 (LAND ALLOCATION - $50,000) 26 (DESIGN AND CONTINGENCIES - $150,000) 27 (71) SR 0079, I-79 BRIDGE OVER CONRAIL, 28 LAKE TOWNSHIP, BRIDGE REPLACEMENT 3,720,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $3,300,000) 19990S0504B1019 - 430 -
1 (LAND ALLOCATION - $20,000) 2 (DESIGN AND CONTINGENCIES - $400,000) 3 (72) SR 0079, I-79 SOUTHBOUND BRIDGE OVER 4 SANDY CREEK, NEW VERNON TOWNSHIP, 5 BRIDGE REPLACEMENT 5,320,000 6 (BASE CONSTRUCTION ALLOCATION - 7 $4,800,000) 8 (LAND ALLOCATION - $20,000) 9 (DESIGN AND CONTINGENCIES - $500,000) 10 Section 48. Mifflin County. 11 (a) Local Bridges 12 (1) Oliver Township, T-803, Bridge over 13 Musser Run, Bridge Replacement 492,000 14 (Base Construction Allocation - 15 $390,000) 16 (Land Allocation - $2,000) 17 (Design and Contingencies - $100,000) 18 (2) Decatur Township, T-379, Bridge over 19 Meadow Creek, Bridge Replacement 370,000 20 (Base Construction Allocation - 21 $300,000) 22 (Land Allocation - $10,000) 23 (Design and Contingencies - $60,000) 24 (3) Burnham Borough, T-782, Buck Run 25 Bridge over Buck Run, Bridge 26 Replacement 892,000 27 (Base Construction Allocation - 28 $672,000) 29 (Land Allocation - $20,000) 30 (Design and Contingencies - $200,000) 19990S0504B1019 - 431 -
1 (4) Menno Township, T-340, Kish Creek 2 Bridge over Kish Creek, Bridge 3 Replacement 262,000 4 (Base Construction Allocation - 5 $180,000) 6 (Land Allocation - $10,000) 7 (Design and Contingencies - $72,000) 8 (5) Oliver Township, T-702, Town Run 9 Bridge over Town Run, Bridge 10 Replacement 340,000 11 (Base Construction Allocation - 12 $250,000) 13 (Land Allocation - $10,000) 14 (Design and Contingencies - $80,000) 15 (6) Wayne Township, T-357, Beaverdam Run 16 Bridge over Beaverdam Run, Bridge 17 Replacement 240,000 18 (Base Construction Allocation - 19 $160,000) 20 (Land Allocation - $20,000) 21 (Design and Contingencies - $60,000) 22 (7) Wayne Township, T-343, Long Hollow Run 23 Bridge over Long Hollow Run, Bridge 24 Rehabilitation 240,000 25 (Base Construction Allocation - 26 $140,000) 27 (Land Allocation - $20,000) 28 (Design and Contingencies - $80,000) 29 (8) WAYNE TOWNSHIP, T-357, BRIDGE OVER <-- 30 BEAVER DAM RUN, BRIDGE REPLACEMENT 376,000 19990S0504B1019 - 432 -
1 (b) State Bridges 2 (1) SR 0022, Bridge over Kish Creek, 3 Lewistown Borough, Bridge Painting 800,000 4 (Base Construction Allocation - 5 $720,000) 6 (Design and Contingencies - $80,000) 7 (2) SR 3017, Bridge over Juniata River, 8 Wayne Township, Bridge Painting 935,000 9 (Base Construction Allocation - 10 $850,000) 11 (Design and Contingencies - $85,000) 12 (3) SR 0022, Strodes Run Bridge over 13 Strodes Run, Granville Township, Bridge 14 Replacement 665,000 15 (Base Construction Allocation - 16 $445,000) 17 (Land Allocation - $20,000) 18 (Design and Contingencies - $200,000) 19 (4) SR 0022, Bridge over Kishacaquillas 20 Creek, Lewistown Borough, Bridge 21 Painting 610,000 22 (Base Construction Allocation - 23 $600,000) 24 (Design and Contingencies - $10,000) 25 (5) SR 0305, Little Kish Creek Bridge over 26 Little Kish Creek, Belleville Borough, 27 Bridge Replacement 980,000 28 (Base Construction Allocation - 29 $800,000) 30 (Land Allocation - $30,000) 19990S0504B1019 - 433 -
1 (Design and Contingencies - $150,000) 2 (6) SR 0322, Bridge over Kish Creek and 3 Conrail, Brown Township, Bridge 4 Replacement 9,300,000 5 (Base Construction Allocation - 6 $8,800,000) 7 (Land Allocation - $100,000) 8 (Design and Contingencies - $400,000) 9 (7) SR 0322, Bridge over T-315 and Jacks 10 Creek, Derry Township and Lewistown, 11 Bridge Replacement 5,300,000 12 (Base Construction Allocation - 13 $4,800,000) 14 (Land Allocation - $100,000) 15 (Design and Contingencies - $400,000) 16 (8) SR 0655, Coffee Run Bridge over Coffee 17 Run, Brown Township, Bridge 18 Replacement 486,000 19 (Base Construction Allocation - 20 $376,000) 21 (Land Allocation - $10,000) 22 (Design and Contingencies - $100,000) 23 (9) SR 0655, Little Kish Creek Bridge over 24 Little Kish Creek, Union Township, 25 Bridge Replacement 390,000 26 (Base Construction Allocation - 27 $280,000) 28 (Land Allocation - $10,000) 29 (Design and Contingencies - $100,000) 30 (10) SR 1002, Honey Creek Bridge No.4 over 19990S0504B1019 - 434 -
1 Honey Creek, Armagh Township, Bridge 2 Replacement 750,000 3 (Base Construction Allocation - 4 $600,000) 5 (Land Allocation - $75,000) 6 (Design and Contingencies - $75,000) 7 (11) SR 1005, Tea Creek Bridge over Tea 8 Creek, Brown Township, Bridge 9 Replacement 460,000 10 (Base Construction Allocation - 11 $350,000) 12 (Land Allocation - $10,000) 13 (Design and Contingencies - $100,000) 14 (12) SR 1005, Bucks Run Bridge over Bucks 15 Run, Burnham Borough, Bridge 16 Replacement 820,000 17 (Base Construction Allocation - 18 $600,000) 19 (Land Allocation - $20,000) 20 (Design and Contingencies - $200,000) 21 (13) SR 2004, Jacks Creek Bridge over 22 Jacks Creek, Derry Township, Bridge 23 Replacement 720,000 24 (Base Construction Allocation - 25 $500,000) 26 (Land Allocation - $20,000) 27 (Design and Contingencies - $200,000) 28 (14) SR 3017, Juniata River Bridge over 29 Juniata River, Wayne Township, Bridge 30 Painting 815,000 19990S0504B1019 - 435 -
1 (Base Construction Allocation - 2 $800,000) 3 (Design and Contingencies - $15,000) 4 (15) SR 4007, Musser Run Bridge over 5 Musser Run, Oliver Township, Bridge 6 Replacement 240,000 7 (Base Construction Allocation - 8 $150,000) 9 (Land Allocation - $10,000) 10 (Design and Contingencies - $80,000) 11 (16) SR 4013, Strodes Run Bridge over 12 Strodes Run, Derry Township, Bridge 13 Replacement 300,000 14 (Base Construction Allocation - 15 $200,000) 16 (Land Allocation - $20,000) 17 (Design and Contingencies - $80,000) 18 Section 49. Monroe County. 19 (a) Local Bridges 20 (1) Hamilton Township, T-202, Bridge over 21 Lake Creek, Bridge Replacement 320,000 22 (Base Construction Allocation - 23 $270,000) 24 (Land Allocation - $10,000) 25 (Design and Contingencies - $40,000) 26 (2) Stroud Township, T-420, Bridge over 27 Cherry Creek, Bridge Replacement 360,000 28 (Base Construction Allocation - 29 $230,000) 30 (Land Allocation - $10,000) 19990S0504B1019 - 436 -
1 (Design and Contingencies - $120,000) 2 (3) Smithfield Township, T-539, Bridge 3 over Marshalls Creek, Bridge 4 Rehabilitation 348,000 5 (Base Construction Allocation - 6 $288,000) 7 (Land Allocation - $10,000) 8 (Design and Contingencies - $50,000) 9 (4) Smithfield Township, T-522, Bridge 10 over Marshalls Creek, Bridge 11 Replacement 134,000 12 (Base Construction Allocation - 13 $116,000) 14 (Land Allocation - $6,000) 15 (Design and Contingencies - $12,000) 16 (5) Barrett Township, T-612, Bridge over 17 Brodhead Creek, Bridge Replacement 174,000 18 (Base Construction Allocation - 19 $152,000) 20 (Land Allocation - $7,000) 21 (Design and Contingencies - $15,000) 22 (6) Hamilton Township, T-414, County 23 Bridge No. 7 over McMichael Creek, 24 Bridge Replacement 1,070,000 25 (Base Construction Allocation - 26 $840,000) 27 (Land Allocation - $30,000) 28 (Design and Contingencies - $200,000) 29 (7) Tunkhannock Township, T-633, Bridge 30 over Tunkhannock Creek, Bridge 19990S0504B1019 - 437 -
1 Replacement 139,000 2 (Base Construction Allocation - 3 $121,000) 4 (Land Allocation - $6,000) 5 (Design and Contingencies - $12,000) 6 (8) Hamilton Township, T-233, County 7 Bridge No. 9 over McMichael Creek, 8 Bridge Replacement 665,000 9 (Base Construction Allocation - 10 $515,000) 11 (Land Allocation - $10,000) 12 (Design and Contingencies - $140,000) 13 (9) Jackson Township, T-486, Bridge over 14 Trout Lake Spillway, Bridge 15 Replacement 184,000 16 (Base Construction Allocation - 17 $160,000) 18 (Land Allocation - $8,000) 19 (Design and Contingencies - $16,000) 20 (10) Hamilton Township, T-231, County 21 Bridge No. 8 over Appenzell Creek, 22 Bridge Replacement 565,000 23 (Base Construction Allocation - 24 $415,000) 25 (Land Allocation - $10,000) 26 (Design and Contingencies - $140,000) 27 (11) Coolbaugh Township, T-591, Steamtown 28 Railroad Bridge, Bridge Replacement 1,031,000 29 (Base Construction Allocation - 30 $937,000) 19990S0504B1019 - 438 -
1 (Design and Contingencies - $94,000) 2 (12) Jackson Township, T-434, County 3 Bridge No. 13 over Appenzell Creek, 4 Bridge Replacement 667,000 5 (Base Construction Allocation - 6 $525,000) 7 (Land Allocation - $12,000) 8 (Design and Contingencies - $130,000) 9 (13) Hamilton Township, T-237, County 10 Bridge No. 12 over Lake Creek, Bridge 11 Replacement 430,000 12 (Base Construction Allocation - 13 $300,000) 14 (Land Allocation - $10,000) 15 (Design and Contingencies - $120,000) 16 (b) State Bridges 17 (1) SR 0447, SR 0447 over Broadhead Creek 18 and Railroad, Stroud Township, Bridge 19 Rehabilitation 1,395,000 20 (Base Construction Allocation - 21 $1,071,000) 22 (Design and Contingencies - $324,000) 23 (2) SR 3003, Silver Spring Boulevard over 24 Chapple Creek, Eldred Township, Bridge 25 Replacement 280,000 26 (Base Construction Allocation - 27 $130,000) 28 (Land Allocation - $50,000) 29 (Design and Contingencies - $100,000) 30 (3) SR 2012, SR 2012 over Broadhead Creek, 19990S0504B1019 - 439 -
1 East Stroudsburg Borough, Bridge 2 Rehabilitation 1,500,000 3 (Base Construction Allocation - 4 $1,150,000) 5 (Design and Contingencies - $350,000) 6 (4) SR 0080, I-80 Westbound over 7 Tunkhannock Creek at County Line, 8 Tobyhanna Township, Bridge 9 Rehabilitation 935,000 10 (Base Construction Allocation - 11 $720,000) 12 (Design and Contingencies - $215,000) 13 (5) SR 0080, I-80 Eastbound over 14 Tunkhannock Creek at County Line, 15 Tunkhannock Township, Bridge 16 Rehabilitation 935,000 17 (Base Construction Allocation - 18 $720,000) 19 (Design and Contingencies - $215,000) 20 (6) SR 4003, SR 4003 over Lehigh River at 21 Lackawanna County Line, Coolbaugh 22 Township, Bridge Rehabilitation 390,000 23 (Base Construction Allocation - 24 $295,000) 25 (Design and Contingencies - $95,000) 26 (7) SR 0033, Northbound Bridge over US 209 27 Westbound, Hamilton Township, Bridge 28 Rehabilitation 180,000 29 (Base Construction Allocation - 30 $180,000) 19990S0504B1019 - 440 -
1 (8) SR 0191, Stites Bridge, Stroudsburg 2 Township, Bridge Rehabilitation 600,000 3 (Base Construction Allocation - 4 $500,000) 5 (Design and Contingencies - $100,000) 6 (9) SR 0209, Bridge over I-80, Smithfield 7 Township, Bridge Rehabilitation 434,000 8 (Base Construction Allocation - 9 $334,000) 10 (Design and Contingencies - $100,000) 11 (10) SR 0402, Ressica Falls Bridge over 12 Big Bushkill Creek, Middle Smithfield 13 Township, Bridge Replacement 1,520,000 14 (Base Construction Allocation - 15 $1,060,000) 16 (Land Allocation - $60,000) 17 (Design and Contingencies - $400,000) 18 (11) SR 0423, Warnertown Bridge over 19 Tobyhanna Creek, Coolbaugh Township, 20 Bridge Rehabilitation 977,000 21 (Base Construction Allocation - 22 $600,000) 23 (Land Allocation - $27,000) 24 (Design and Contingencies - $350,000) 25 (12) SR 0940, Pocono Summit Bridge over 26 Conrail, Tobyhanna Township, Bridge 27 Rehabilitation 1,250,000 28 (Base Construction Allocation - 29 $1,000,000) 30 (Land Allocation - $50,000) 19990S0504B1019 - 441 -
1 (Design and Contingencies - $200,000) 2 (13) SR 1010, Bridge over Stony Creek, 3 Price Township, Bridge Replacement 310,000 4 (Base Construction Allocation - 5 $200,000) 6 (Land Allocation - $10,000) 7 (Design and Contingencies - $100,000) 8 (14) SR 2003, Bridge over Cherry Creek, 9 Hamilton Township, Bridge Replacement 205,000 10 (Base Construction Allocation - 11 $139,000) 12 (Land Allocation - $13,000) 13 (Design and Contingencies - $53,000) 14 (15) SR 2004, Saylorsburg Bridge over SR 15 0033, Hamilton Township, Bridge 16 Rehabilitation 335,000 17 (Base Construction Allocation - 18 $304,000) 19 (Design and Contingencies - $31,000) 20 (16) SR 2017, Bridge over I-80 at Exit 51, 21 East Stroudsburg Borough, Bridge 22 Rehabilitation 689,000 23 (Base Construction Allocation - 24 $625,000) 25 (Design and Contingencies - $64,000) 26 (17) SR 2030, Water Gap Bridge over US 27 209, Smithfield Township, Bridge 28 Rehabilitation 1,390,000 29 (Base Construction Allocation - 30 $1,158,000) 19990S0504B1019 - 442 -
1 (Design and Contingencies - $232,000) 2 (18) SR 3011, Bridge over Sugar Hollow 3 Creek, Chestnuthill Township, Bridge 4 Replacement 129,000 5 (Base Construction Allocation - 6 $117,000) 7 (Design and Contingencies - $12,000) 8 (19) SR 3016, Bridge over Pohopoco Creek, 9 Chestnuthill Township, Bridge 10 Replacement 139,000 11 (Base Construction Allocation - 12 $121,000) 13 (Land Allocation - $6,000) 14 (Design and Contingencies - $12,000) 15 (20) SR 3018, Bridge No.1 over Kettle 16 Creek, Hamilton Township, Bridge 17 Replacement 80,000 18 (Base Construction Allocation - 19 $70,000) 20 (Land Allocation - $3,000) 21 (Design and Contingencies - $7,000) 22 (21) SR 3018, Bridge No.2 over Kettle 23 Creek, Hamilton Township, Bridge 24 Replacement 68,000 25 (Base Construction Allocation - 26 $59,000) 27 (Land Allocation - $3,000) 28 (Design and Contingencies - $6,000) 29 (22) SR 3022, Bridge over McMichael Creek, 30 Hamilton Township, Bridge Replacement 161,000 19990S0504B1019 - 443 -
1 (Base Construction Allocation - 2 $140,000) 3 (Land Allocation - $7,000) 4 (Design and Contingencies - $14,000) 5 (23) SR 4001, Long Pond Bridge over 6 Tunkhannock Creek, Tunkhannock 7 Township, Bridge Replacement 1,454,000 8 (Base Construction Allocation - 9 $900,000) 10 (Land Allocation - $50,000) 11 (Design and Contingencies - $500,000) 12 (24) SR 4007, Pocono Manor Bridge over E L 13 Railroad, Borough of Mt. Pocono, Bridge 14 Replacement 1,185,000 15 (Base Construction Allocation - 16 $935,000) 17 (Land Allocation - $50,000) 18 (Design and Contingencies - $200,000) 19 (25) SR 0080, Five Bridges over I-80 20 including SRs 0191, 0209, 2017, 2030 21 and 8026, Bridge Deck Rehabilitation 5,250,000 22 (Base Construction Allocation - 23 $3,500,000) 24 (Design and Contingencies - $1,750,000) 25 (26) SR 2017, Bridge over I-80, East 26 Stroudsburg Borough, Bridge Deck 27 Rehabilitation 1,500,000 28 (Base Construction Allocation - 29 $1,500,000) 30 Section 50. Montgomery County. 19990S0504B1019 - 444 -
1 (a) Local Bridges 2 (1) Norristown Borough, Hospital Bridge 3 over Stony Creek, Bridge Replacement 412,000 4 (Base Construction Allocation - 5 $365,000) 6 (Land Allocation - $10,000) 7 (Design and Contingencies - $37,000) 8 (2) Trappe Borough, College Avenue Bridge 9 over Tributary of Perkiomen Creek, 10 Bridge Replacement 360,000 11 (Base Construction Allocation - 12 $300,000) 13 (Land Allocation - $10,000) 14 (Design and Contingencies - $50,000) 15 (3) Towamencin Township, Bustard Road 16 Bridge over Towamencin Creek, Bridge 17 Replacement 454,000 18 (Base Construction Allocation - 19 $400,000) 20 (Land Allocation - $10,000) 21 (Design and Contingencies - $44,000) 22 (4) Upper Hanover Township, T-444, 23 Treichler Road Bridge under Reading 24 Railroad, Bridge Removal 151,000 25 (Base Construction Allocation - 26 $126,000) 27 (Land Allocation - $5,000) 28 (Design and Contingencies - $20,000) 29 (5) Upper Providence Township, T-400, 30 Supio Road Bridge under Reading 19990S0504B1019 - 445 -
1 Railroad, Bridge Removal 187,000 2 (Base Construction Allocation - 3 $157,000) 4 (Land Allocation - $5,000) 5 (Design and Contingencies - $25,000) 6 (6) Upper Salford Township, T-444, Bridge 7 over Abandoned Railroad, Bridge 8 Removal 1,175,000 9 (Base Construction Allocation - 10 $1,000,000) 11 (Land Allocation - $25,000) 12 (Design and Contingencies - $150,000) 13 (7) Norristown Borough, Markley Street 14 Bridge over Stoney Creek, Bridge 15 Replacement 1,250,000 16 (Base Construction Allocation - 17 $1,000,000) 18 (Land Allocation - $50,000) 19 (Design and Contingencies - $200,000) 20 (8) Norristown Borough, Markley Street 21 Bridge over Stoney Creek, Bridge 22 Rehabilitation 500,000 23 (Base Construction Allocation - 24 $400,000) 25 (Land Allocation - $10,000) 26 (Design and Contingencies - $90,000) 27 (9) Horsham Township, Davis Grove Road 28 over Park Creek, Bridge Replacement 300,000 29 (Base Construction Allocation - 30 $230,000) 19990S0504B1019 - 446 -
1 (Land Allocation - $20,000) 2 (Design and Contingencies - $50,000) 3 (10) Franconia Township, Keller Creamery 4 Road over Indian Creek, Bridge 5 Replacement 320,000 6 (Base Construction Allocation - 7 $250,000) 8 (Land Allocation - $20,000) 9 (Design and Contingencies - $50,000) 10 (11) East Norriton Township, Germantown 11 Pike over Five Mile Run Creek, Bridge 12 Replacement 500,000 13 (Base Construction Allocation - 14 $430,000) 15 (Land Allocation - $20,000) 16 (Design and Contingencies - $50,000) 17 (12) Upper Hanover Township, Eleventh 18 Street over Macoby Creek, Bridge 19 Replacement 400,000 20 (Base Construction Allocation - 21 $340,000) 22 (Land Allocation - $20,000) 23 (Design and Contingencies - $40,000) 24 (13) Lower Merion Township, Black Rock 25 Road over Mill Creek, Bridge 26 Replacement 350,000 27 (Base Construction Allocation - 28 $295,000) 29 (Land Allocation - $20,000) 30 (Design and Contingencies - $35,000) 19990S0504B1019 - 447 -
1 (14) Lower Merion Township, Morris Road 2 over Mill Creek, Bridge Replacement 350,000 3 (Base Construction Allocation - 4 $285,000) 5 (Land Allocation - $20,000) 6 (Design and Contingencies - $45,000) 7 (15) Upper Merion Township, Conrail over 8 South Gulph Road, Bridge Replacement 4,500,000 9 (Base Construction Allocation - 10 $4,250,000) 11 (Land Allocation - $50,000) 12 (Design and Contingencies - $200,000) 13 (16) Trappe Borough, College Avenue over 14 Buckwalter Tributary, Bridge 15 Replacement 140,000 16 (Base Construction Allocation - 17 $120,000) 18 (Design and Contingencies - $20,000) 19 (17) UPPER HANOVER TOWNSHIP, KNIGHTS ROAD <-- 20 BRIDGE NO.237 OVER GREEN LANE 21 RESERVOIR, BRIDGE REHABILITATION 1,450,000 22 (BASE CONSTRUCTION ALLOCATION - 23 $1,200,000) 24 (DESIGN AND CONTINGENCIES - $250,000) 25 (b) State Bridges 26 (1) SR 2009, Byberry Road Bridge over 27 Southampton Creek, Upper Moreland 28 Township and Bryn Athyn Borough, 29 Historic Bridge Replacement 680,000 30 (Base Construction Allocation - 19990S0504B1019 - 448 -
1 $500,000) 2 (Land Allocation - $20,000) 3 (Design and Contingencies - $160,000) 4 (2) SR 2018, Bethlehem Pike Bridge over 5 Branch of Wissahickon Creek, 6 Springfield Township, Bridge 7 Rehabilitation 525,000 8 (Base Construction Allocation - 9 $400,000) 10 (Land Allocation - $25,000) 11 (Design and Contingencies - $100,000) 12 (3) SR 4030, New Hanover Square Road 13 Bridge over West Swamp Creek (Two 14 Bridges), New Hanover Township, Bridge 15 Replacement 1,150,000 16 (Base Construction Allocation - 17 $900,000) 18 (Land Allocation - $50,000) 19 (Design and Contingencies - $200,000) 20 (4) SR 0100, Extended, (Three Bridges), 21 High Street to Farmington Road, 22 Pottstown Borough and Upper Pottsgrove 23 Township, Bridge Rehabilitation 1,650,000 24 (Base Construction Allocation - 25 $1,500,000) 26 (Land Allocation - $50,000) 27 (Design and Contingencies - $100,000) 28 (5) SR 1017, Salfordville Road Bridge over 29 East Branch of Perkiomen Creek, Lower 30 Salford Township, Bridge Replacement 1,500,000 19990S0504B1019 - 449 -
1 (Base Construction Allocation - 2 $1,250,000) 3 (Land Allocation - $50,000) 4 (Design and Contingencies - $200,000) 5 (6) SR 1024, Salford Station (Two Bridges) 6 over Perkiomen Creek, Upper Salford and 7 Lower Fredrick Townships, Bridge 8 Replacement 1,200,000 9 (Base Construction Allocation - 10 $1,000,000) 11 (Land Allocation - $50,000) 12 (Design and Contingencies - $150,000) 13 (7) SR 3020, Dannehower Bridge over River 14 and New US 202, Upper Merion Township, 15 Bridgeport and Norristown Boroughs, 16 Bridge Painting 872,000 17 (Base Construction Allocation - 18 $802,000) 19 (Design and Contingencies - $70,000) 20 (8) SR 3039, South Gulph Road Overpass 21 under Conrail, Upper Merion Township, 22 Bridge Replacement 1,500,000 23 (Base Construction Allocation - 24 $1,300,000) 25 (Land Allocation - $50,000) 26 (Design and Contingencies - $150,000) 27 (9) SR 4003, Black Rock Road Bridge over 28 Abandoned Reading Track, Upper 29 Providence Township, Bridge Removal 205,000 30 (Base Construction Allocation - 19990S0504B1019 - 450 -
1 $175,000) 2 (Land Allocation - $10,000) 3 (Design and Contingencies - $20,000) 4 (10) SR 4012, Graterford Road Bridge over 5 Perkiomen Creek, Skippack and Perkiomen 6 Townships, Bridge Replacement 1,475,000 7 (Base Construction Allocation - 8 $1,300,000) 9 (Land Allocation - $50,000) 10 (Design and Contingencies - $125,000) 11 (11) SR 4031, Ridge Pike Bridge over 12 Manatawny Creek, Pottstown Borough, 13 Bridge Replacement 2,053,000 14 (Base Construction Allocation - 15 $1,935,000) 16 (Land Allocation - $45,000) 17 (Design and Contingencies - $73,000) 18 (12) SR 0463, Horsham Road Bridge over 19 Upper State Road, Montgomery Township, 20 Bridge Replacement 1,100,000 21 (Base Construction Allocation - 22 $950,000) 23 (Land Allocation - $150,000) 24 (13) SR 0422, Pottstown Expressway Bridge 25 over Schuylkill River, Lower Pottsgrove 26 Township, Bridge Deck Rehabilitation 310,000 27 (Base Construction Allocation - 28 $240,000) 29 (Land Allocation - $10,000) 30 (Design and Contingencies - $60,000) 19990S0504B1019 - 451 -
1 (14) SR 3020, Dannehower Bridge over 2 Schuylkill River, Parkway and Railroad, 3 Upper Merion Township, Bridge Deck 4 Rehabilitation 1,420,000 5 (Base Construction Allocation - 6 $1,165,000) 7 (Land Allocation - $40,000) 8 (Design and Contingencies - $215,000) 9 Section 51. Montour County. 10 (a) Local Bridges 11 (1) Derry Township, T-407, County Bridge 12 No.13 over West Branch of Chillisquaque 13 Creek near Washingtonville Borough, 14 Bridge Replacement 350,000 15 (Base Construction Allocation - 16 $265,000) 17 (Land Allocation - $35,000) 18 (Design and Contingencies - $50,000) 19 (2) LIBERTY TOWNSHIP, T-324, BRIDGE OVER <-- 20 CHILLISQUAQUE CREEK, BRIDGE 21 REPLACEMENT 824,000 22 (BASE CONSTRUCTION ALLOCATION - 23 $634,000) 24 (DESIGN AND CONTINGENCIES - $190,000) 25 (3) LIMESTONE TOWNSHIP, T-417, BRIDGE OVER 26 CHILLISQUAQUE CREEK, BRIDGE 27 REPLACEMENT 559,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $399,000) 30 (DESIGN AND CONTINGENCIES - $160,000) 19990S0504B1019 - 452 -
1 (b) State Bridges 2 (1) SR 1004, Bridge over Chillisquaque 3 Creek, North of Washingtonville 4 Borough, Bridge Replacement 620,000 5 (Base Construction Allocation - 6 $500,000) 7 (Land Allocation - $40,000) 8 (Design and Contingencies - $80,000) 9 (2) SR 1006, Bridge over Branch of 10 Chillisquaque Creek, 3 Miles Northwest 11 of Washingtonville Borough, Bridge 12 Replacement 510,000 13 (Base Construction Allocation - 14 $410,000) 15 (Land Allocation - $25,000) 16 (Design and Contingencies - $80,000) 17 (3) SR 3004, Bridge over Beaver Run, 2 18 Miles West of Moresburg, Bridge 19 Replacement 285,000 20 (Base Construction Allocation - 21 $227,000) 22 (Land Allocation - $14,000) 23 (Design and Contingencies - $44,000) 24 (4) SR 4001, Bridge over Chillisquaque 25 Creek, Anthony Township, Bridge 26 Replacement 458,000 27 (Base Construction Allocation - 28 $366,000) 29 (Land Allocation - $23,000) 30 (Design and Contingencies - $69,000) 19990S0504B1019 - 453 -
1 (5) SR 0011, SR 0011 over Sechler Run, 2 Mahoning Township, Bridge Replacement 582,000 3 (Base Construction Allocation - 4 $466,000) 5 (Land Allocation - $29,000) 6 (Design and Contingencies - $87,000) 7 (6) SR 0054, SR 0054 over Chillisquaque 8 Creek, Anthony Township, Bridge 9 Replacement 547,000 10 (Base Construction Allocation - 11 $438,000) 12 (Land Allocation - $27,000) 13 (Design and Contingencies - $82,000) 14 (7) SR 0642, SR 0642 over Mahoning Creek, 15 West Hemlock Township, Bridge 16 Replacement 213,000 17 (Base Construction Allocation - 18 $170,000) 19 (Land Allocation - $11,000) 20 (Design and Contingencies - $32,000) 21 (8) SR 1009, SR 1009 over Branch of Lowry 22 Run, Anthony Township, Bridge 23 Replacement 431,000 24 (Base Construction Allocation - 25 $345,000) 26 (Land Allocation - $21,000) 27 (Design and Contingencies - $65,000) 28 (9) SR 1011, SR 1011 over Tributary of 29 Chillisquaque Creek, Anthony Township, 30 Bridge Replacement 212,000 19990S0504B1019 - 454 -
1 (Base Construction Allocation - 2 $170,000) 3 (Land Allocation - $11,000) 4 (Design and Contingencies - $31,000) 5 Section 52. Northampton County. 6 (a) Local Bridges 7 (1) Lehigh Township, Indiantrail Road 8 Bridge over Indian Creek, Bridge 9 Painting 16,000 10 (Base Construction Allocation - 11 $14,000) 12 (Design and Contingencies - $2,000) 13 (2) Lehigh Township, T-548, Bridge over 14 Bertsch Creek, Bridge Replacement 400,000 15 (Base Construction Allocation - 16 $300,000) 17 (Land Allocation - $20,000) 18 (Design and Contingencies - $80,000) 19 (3) Lehigh Township, Wood Drive Bridge, 20 Bridge Replacement 65,000 21 (Base Construction Allocation - 22 $41,000) 23 (Land Allocation - $4,000) 24 (Design and Contingencies - $20,000) 25 (4) Freemansburg Borough, LVRR Bridge over 26 Main Street, Bridge Removal 898,000 27 (Base Construction Allocation - 28 $694,000) 29 (Land Allocation - $100,000) 30 (Design and Contingencies - $104,000) 19990S0504B1019 - 455 -
1 (5) City of Bethlehem, County Bridge 2 No.88, Bridge over Monocacy Creek, 3 Bridge Rehabilitation 275,000 4 (Base Construction Allocation - 5 $250,000) 6 (Design and Contingencies - $25,000) 7 (6) CITY OF EASTON, BUSHKILL STREET BRIDGE <-- 8 OVER BUSHKILL CREEK, BRIDGE 9 REHABILITATION 102,000 10 (7) CITY OF EASTON, RAILROAD BRIDGE OVER 11 SR 2005, BRIDGE REHABILITATION 5,000,000 12 (8) CITY OF EASTON, OLD GLENDON BRIDGE 13 OVER LEHIGH RIVER, BRIDGE 14 REHABILITATION 1,381,000 15 (9) CITY OF EASTON, RAILROAD BRIDGE OVER 16 SR 2005, BRIDGE REHABILITATION 5,000,000 17 (10) LOWER MOUNT BETHEL TOWNSHIP, T-692, 18 BRIDGE OVER OUGHOUGHTON CREEK, BRIDGE 19 REPLACEMENT 440,000 20 (11) LOWER SAUCON TOWNSHIP, T-371, BRIDGE 21 OVER SAUCON CREEK, BRIDGE 22 REHABILITATION 100,000 23 (12) PLAINFIELD TOWNSHIP, T-629, BRIDGE 24 OVER WIND GAP CREEK, BRIDGE 25 REPLACEMENT 210,000 26 (13) STOCKERTOWN BOROUGH, LEFEVRE ROAD 27 BRIDGE OVER LITTLE BUSHKILL CREEK, 28 BRIDGE REPLACEMENT 380,000 29 (14) UPPER NAZARETH TOWNSHIP, T-511, 30 BRIDGE OVER EAST BRANCH OF MONOCACY 19990S0504B1019 - 456 -
1 CREEK, BRIDGE REPLACEMENT 186,000 2 (b) State Bridges 3 (1) SR 2017, Tatamy Road over Tributary of 4 Bushkill Creek, Palmer Township, Bridge 5 Rehabilitation 240,000 6 (Base Construction Allocation - 7 $100,000) 8 (Land Allocation - $40,000) 9 (Design and Contingencies - $100,000) 10 (2) SR 4020, Maple Drive over Tributary of 11 Bertsch Creek, Lehigh Township, Bridge 12 Rehabilitation 465,000 13 (Base Construction Allocation - 14 $275,000) 15 (Land Allocation - $80,000) 16 (Design and Contingencies - $110,000) 17 (3) SR 0611, Railroad Bridge over SR 0611, 18 Borough of Portland, Bridge 19 Reconstruction 2,500,000 20 (Base Construction Allocation - 21 $1,800,000) 22 (Land Allocation - $170,000) 23 (Design and Contingencies - $530,000) 24 (4) SR 0033, Bridges over Van Buren Road 25 and SR 1002, Palmer Township, Bridge 26 Deck Rehabilitation 3,000,000 27 (Base Construction Allocation - 28 $3,000,000) 29 (5) SR 0378, Overhead Bridges on Broad, 30 14th and Eaton Avenue, City of 19990S0504B1019 - 457 -
1 Bethlehem, Bridge Rehabilitation 1,500,000 2 (Base Construction Allocation - 3 $1,500,000) 4 (6) SR 0611, Sandts Eddy Arch Bridge over 5 Mud Run, Lower Mt. Bethel Township, 6 Bridge Replacement 800,000 7 (Base Construction Allocation - 8 $700,000) 9 (Land Allocation - $20,000) 10 (Design and Contingencies - $80,000) 11 Section 53. Northumberland County. 12 (a) Local Bridges 13 (1) Borough of Milton, Ridge Avenue over 14 Limestone Run, Bridge Replacement 520,000 15 (Base Construction Allocation - 16 $380,000) 17 (Land Allocation - $20,000) 18 (Design and Contingencies - $120,000) 19 (2) Lewis Township, T-631, Old State Road 20 Bridge over Branch of Beaver Run, 21 Bridge Replacement 220,000 22 (Base Construction Allocation - 23 $200,000) 24 (Design and Contingencies - $20,000) 25 (3) Ralpho Township, County Bridge No.183, 26 Bridge Replacement 190,000 27 (b) State Bridges 28 (1) SR 0642, Chillisquaque Creek Bridge 29 over Chillisquaque Creek, 0.5 Mile East 30 of Pottsgrove, Bridge Deck Replacement 1,184,000 19990S0504B1019 - 458 -
1 (Base Construction Allocation - 2 $947,000) 3 (Land Allocation - $59,000) 4 (Design and Contingencies - $178,000) 5 (2) SR 1005, Delaware Run Bridge over 6 Delaware Run, 3 Miles North of 7 Watsontown Borough, Bridge Replacement 509,000 8 (Base Construction Allocation - 9 $408,000) 10 (Land Allocation - $25,000) 11 (Design and Contingencies - $76,000) 12 (3) SR 0045, Bridge over Chillisquaque 13 Creek, East of SR 0147, Bridge 14 Painting 260,000 15 (Base Construction Allocation - 16 $250,000) 17 (Design and Contingencies - $10,000) 18 (4) SR 0054, SR 0054 over North Branch of 19 Shamokin Creek, Mt. Carmel Township, 20 Bridge Replacement 721,000 21 (Base Construction Allocation - 22 $577,000) 23 (Land Allocation - $36,000) 24 (Design and Contingencies - $108,000) 25 (5) SR 2001, SR 2001 over Little Roaring 26 Creek, Rush Township, Bridge 27 Replacement 415,000 28 (Base Construction Allocation - 29 $335,000) 30 (Land Allocation - $20,000) 19990S0504B1019 - 459 -
1 (Design and Contingencies - $60,000) 2 (6) SR 2023, SR 2023 over Conrail, Mt. 3 Carmel Township, Bridge Replacement 1,275,000 4 (Base Construction Allocation - 5 $1,020,000) 6 (Land Allocation - $64,000) 7 (Design and Contingencies - $191,000) 8 (7) SR 4013, SR 4013 over Plum Creek, 9 Rockefeller Township, Bridge 10 Replacement 361,000 11 (Base Construction Allocation - 12 $289,000) 13 (Land Allocation - $18,000) 14 (Design and Contingencies - $54,000) 15 (8) SR 0011, Railroad Overpass Bridge over 16 Water Street, Northumberland Borough, 17 Bridge Rehabilitation 3,500,000 18 (Base Construction Allocation - 19 $3,200,000) 20 (Land Allocation - $100,000) 21 (Design and Contingencies - $200,000) 22 (9) SR 1025, Chillisquaque Creek Bridge 23 over Chillisquaque Creek, East 24 Chillisquaque Township, Bridge 25 Painting 135,000 26 (Base Construction Allocation - 27 $125,000) 28 (Design and Contingencies - $10,000) 29 (10) SR 3006, Mahanoy Creek Bridge over 30 Mahanoy Creek, Jackson Township, Bridge 19990S0504B1019 - 460 -
1 Painting 360,000 2 (Base Construction Allocation - 3 $350,000) 4 (Design and Contingencies - $10,000) 5 (11) SR 0180, I-180 BRIDGE, 6 STRUCTURES, <-- 6 LYCOMING COUNTY TO DELAWARE TOWNSHIP, 7 BRIDGE REHABILITATION 2,450,000 8 (BASE CONSTRUCTION ALLOCATION - 9 $2,300,000) 10 (DESIGN AND CONTINGENCIES - $150,000) 11 (12) SR 2015, HOSPITAL ROAD BRIDGE OVER 12 SHAMOKIN CREEK, COAL TOWNSHIP, BRIDGE 13 REPLACEMENT 200,000 14 (BASE CONSTRUCTION ALLOCATION - 15 $170,000) 16 (DESIGN AND CONTINGENCIES - $30,000) 17 Section 54. Perry County. 18 (a) Local Bridges 19 (1) Tyrone Township, County Bridge No.4, 20 Rices Bridge over Shermans Creek, 21 Covered Bridge Replacement 768,000 22 (Base Construction Allocation - 23 $552,000) 24 (Land Allocation - $77,000) 25 (Design and Contingencies - $139,000) 26 (2) Northeast Madison Township, T-403 over 27 Bixler Run, Bridge Replacement 585,000 28 (Base Construction Allocation - 29 $400,000) 30 (Land Allocation - $10,000) 19990S0504B1019 - 461 -
1 (Design and Contingencies - $175,000) 2 (3) Tyrone Township, Rices Bridge (County 3 Bridge No.4) over Shermans Creek, 4 Bridge Replacement 768,000 5 (Base Construction Allocation - 6 $552,000) 7 (Land Allocation - $77,000) 8 (Design and Contingencies - $139,000) 9 (4) JACKSON TOWNSHIP, T-312, BRIDGE OVER <-- 10 SHERMANS CREEK, BRIDGE REPLACEMENT 1,000,000 11 (5) MARYSVILLE BOROUGH, SOUTH MAIN STREET 12 BRIDGE OVER FISHING CREEK, BRIDGE 13 REPLACEMENT 600,000 14 (6) NORTHEAST MADISON TOWNSHIP, T-403, 15 BRIDGE OVER BIXLER RUN, BRIDGE 16 REPLACEMENT 600,000 17 (7) RYE TOWNSHIP, T-506, BRIDGE OVER 18 FISHING CREEK, BRIDGE REPLACEMENT 50,000 19 (BASE CONSTRUCTION ALLOCATION - 20 $37,000) 21 (DESIGN AND CONTINGENCIES - $13,000) 22 (8) RYE TOWNSHIP, T-305, BRIDGE OVER 23 FISHING CREEK RUN, BRIDGE REPLACEMENT 85,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $73,000) 26 (DESIGN AND CONTINGENCIES - $12,000) 27 (9) SAVILLE TOWNSHIP, T-324, BRIDGE OVER 28 BIG BUFFALO CREEK, BRIDGE REPLACEMENT 550,000 29 (10) SOUTHWEST MADISON TOWNSHIP, T-405 30 (SMT-3), BRIDGE OVER LAUREL RUN, BRIDGE 19990S0504B1019 - 462 -
1 REPLACEMENT 550,000 2 (11) SOUTHWEST MADISON TOWNSHIP, T-405 3 (SMT-2), BRIDGE OVER LAUREL RUN, BRIDGE 4 REPLACEMENT 575,000 5 (12) SOUTHWEST MADISON TOWNSHIP, T-405 6 (SMT-1), BRIDGE OVER LAUREL RUN, BRIDGE 7 REPLACEMENT 575,000 8 (13) TOBOYNE TOWNSHIP, T-300, BRIDGE OVER 9 SHAEFFER RUN, BRIDGE REPLACEMENT 550,000 10 (14) TYRONE TOWNSHIP, T-381, BRIDGE OVER 11 MONTOUR CREEK, BRIDGE REPLACEMENT 550,000 12 (15) WHEATFIELD TOWNSHIP, T-506, BRIDGE 13 OVER LITTLE JUNIATA CREEK, BRIDGE 14 REPLACEMENT 575,000 15 (16) WHEATFIELD TOWNSHIP, T-466, BRIDGE 16 OVER LITTLE JUNIATA CREEK, BRIDGE 17 REPLACEMENT 550,000 18 (b) State Bridges 19 (1) SR 4006, Raccoon Creek Bridge over 20 Raccoon Creek, Tuscarora Township, 21 Bridge Replacement 466,000 22 (Base Construction Allocation - 23 $288,000) 24 (Land Allocation - $20,000) 25 (Design and Contingencies - $158,000) 26 (2) SR 3002, Horse Valley Road Bridges 27 (Two Bridges) over Horse Valley Run, 28 Toboyne Township, Bridge Replacement 725,000 29 (Base Construction Allocation - 30 $700,000) 19990S0504B1019 - 463 -
1 (Land Allocation - $5,000) 2 (Design and Contingencies - $20,000) 3 (3) SR 4008, BRIDGE OVER BIG BUFFALO <-- 4 CREEK, SAVILLE TOWNSHIP, BRIDGE 5 REPLACEMENT 913,000 6 (BASE CONSTRUCTION ALLOCATION - 7 $676,000) 8 (LAND ALLOCATION - $67,000) 9 (DESIGN AND CONTINGENCIES - $170,000) 10 (4) PA 849, BRIDGE OVER BUFFALO CREEK, 11 TUSCARORA TOWNSHIP, BRIDGE REPLACEMENT 1,379,000 12 (BASE CONSTRUCTION ALLOCATION - 13 $1,022,000) 14 (LAND ALLOCATION - $102,000) 15 (DESIGN AND CONTINGENCIES - $255,000) 16 (5) PA 849, BRIDGE OVER BUFFALO CREEK, 17 JUNIATA TOWNSHIP, BRIDGE REPLACEMENT 1,298,000 18 (BASE CONSTRUCTION ALLOCATION - 19 $962,000) 20 (LAND ALLOCATION - $96,000) 21 (DESIGN AND CONTINGENCIES - $240,000) 22 (6) PA 849, BRIDGE OVER BUFFALO CREEK, 23 JUNIATA TOWNSHIP, BRIDGE REPLACEMENT 1,317,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $976,000) 26 (LAND ALLOCATION - $97,000) 27 (DESIGN AND CONTINGENCIES - $244,000) 28 (7) PA 849, BRIDGE OVER BUFFALO CREEK, 29 JUNIATA TOWNSHIP, BRIDGE REPLACEMENT 1,440,000 30 (BASE CONSTRUCTION ALLOCATION - 19990S0504B1019 - 464 -
1 $1,067,000) 2 (LAND ALLOCATION - $106,000) 3 (DESIGN AND CONTINGENCIES - $267,000) 4 (8) SR 1011, BRIDGE OVER LITTLE BUFFALO 5 CREEK, CENTRE TOWNSHIP, BRIDGE 6 REPLACEMENT 356,000 7 (BASE CONSTRUCTION ALLOCATION - 8 $264,000) 9 (LAND ALLOCATION - $26,000) 10 (DESIGN AND CONTINGENCIES - $66,000) 11 (9) SR 1010, BRIDGE OVER BARGERS RUN, 12 LIVERPOOL BOROUGH, BRIDGE REPLACEMENT 535,000 13 (BASE CONSTRUCTION ALLOCATION - 14 $396,000) 15 (LAND ALLOCATION - $40,000) 16 (DESIGN AND CONTINGENCIES - $99,000) 17 (10) SR 2003, BRIDGE OVER SHERMANS CREEK, 18 CARROLL TOWNSHIP, BRIDGE REPLACEMENT 308,000 19 (BASE CONSTRUCTION ALLOCATION - 20 $170,000) 21 (LAND ALLOCATION - $10,000) 22 (DESIGN AND CONTINGENCIES - $128,000) 23 (11) SR 3005, BRIDGE OVER SHERMANS CREEK, 24 SOUTHWEST MADISON TOWNSHIP, BRIDGE 25 REHABILITATION 239,000 26 (BASE CONSTRUCTION ALLOCATION - 27 $99,000) 28 (LAND ALLOCATION - $20,000) 29 (DESIGN AND CONTINGENCIES - $120,000) 30 (12) VARIOUS BRIDGES PREVENTIVE 19990S0504B1019 - 465 -
1 MAINTENANCE 382,000 2 Section 55. Philadelphia County. 3 (a) Local Bridges 4 (1) City of Philadelphia, Byberry Road 5 Bridge over Conrail, Temporary Bridge 6 Construction 511,000 7 (Base Construction Allocation - 8 $390,000) 9 (Land Allocation - $51,000) 10 (Design and Contingencies - $70,000) 11 (2) City of Philadelphia, Wyoming Avenue 12 Bridge over Former Course Frankford 13 Creek, West of Castor Avenue, Bridge 14 Replacement 1,300,000 15 (Base Construction Allocation - 16 $1,200,000) 17 (Design and Contingencies - $100,000) 18 (3) City of Philadelphia, Chelten Avenue 19 Bridge over SEPTA, West of Wayne 20 Avenue, Bridge Replacement 2,300,000 21 (Base Construction Allocation - 22 $2,100,000) 23 (Design and Contingencies - $200,000) 24 (4) City of Philadelphia, Fisher's Lane 25 Bridge over Tacony Creek, West of 26 Ramona Avenue, Bridge Replacement 1,625,000 27 (Base Construction Allocation - 28 $1,400,000) 29 (Design and Contingencies - $225,000) 30 (5) City of Philadelphia, Kingsessing 19990S0504B1019 - 466 -
1 Avenue Bridge over SEPTA, Bridge 2 Replacement 2,550,000 3 (Base Construction Allocation - 4 $2,200,000) 5 (Land Allocation - $100,000) 6 (Design and Contingencies - $250,000) 7 (6) City of Philadelphia, Montgomery 8 Bridge over Amtrak, Bridge Replacement 5,275,000 9 (Base Construction Allocation - 10 $4,750,000) 11 (Land Allocation - $125,000) 12 (Design and Contingencies - $400,000) 13 (7) City of Philadelphia, Thomas Avenue 14 Bridge over SEPTA, Bridge Replacement 3,150,000 15 (Base Construction Allocation - 16 $2,750,000) 17 (Land Allocation - $100,000) 18 (Design and Contingencies - $300,000) 19 (8) City of Philadelphia, Sedgley Avenue 20 Bridge over Conrail, Bridge 21 Replacement 1,000,000 22 (Base Construction Allocation - 23 $800,000) 24 (Land Allocation - $100,000) 25 (Design and Contingencies - $100,000) 26 (9) City of Philadelphia, Lexington Avenue 27 Bridge over Conrail, Bridge 28 Replacement 420,000 29 (Base Construction Allocation - 30 $360,000) 19990S0504B1019 - 467 -
1 (Land Allocation - $20,000) 2 (Design and Contingencies - $40,000) 3 (10) City of Philadelphia, Greenland 4 Bridge over Conrail and I-76, Bridge 5 Replacement 1,350,000 6 (Base Construction Allocation - 7 $1,100,000) 8 (Land Allocation - $100,000) 9 (Design and Contingencies - $150,000) 10 (11) City of Philadelphia, Glenwood Drive 11 Bridge over Conrail, Bridge 12 Replacement 1,450,000 13 (Base Construction Allocation - 14 $1,200,000) 15 (Land Allocation - $100,000) 16 (Design and Contingencies - $150,000) 17 (12) City of Philadelphia, Second Street 18 Bridge over Conrail, Bridge 19 Replacement 740,000 20 (Base Construction Allocation - 21 $650,000) 22 (Land Allocation - $20,000) 23 (Design and Contingencies - $70,000) 24 (13) City of Philadelphia, Cambria Street 25 Bridge over Conrail, Bridge 26 Replacement 2,750,000 27 (Base Construction Allocation - 28 $2,400,000) 29 (Land Allocation - $100,000) 30 (Design and Contingencies - $250,000) 19990S0504B1019 - 468 -
1 (14) CITY OF PHILADELPHIA, 42ND STREET <-- 2 BRIDGE OVER AMTRAK, BRIDGE REPLACEMENT 5,625,000 3 (BASE CONSTRUCTION ALLOCATION - 4 $3,500,000) 5 (DESIGN AND CONTINGENCIES - $2,125,000) 6 (15) CITY OF PHILADELPHIA, GERMANTOWN 7 AVENUE BRIDGE OVER WISSAHICKON CREEK, 8 BRIDGE REPLACEMENT 5,800,000 9 (BASE CONSTRUCTION ALLOCATION - 10 $5,000,000) 11 (DESIGN AND CONTINGENCIES - $800,000) 12 (16) CITY OF PHILADELPHIA, CAYUGA STREET 13 BRIDGE OVER CONRAIL, BRIDGE REMOVAL 2,350,000 14 (BASE CONSTRUCTION ALLOCATION - 15 $2,000,000) 16 (DESIGN AND CONTINGENCIES - $350,000) 17 (17) CITY OF PHILADELPHIA, 40TH STREET 18 BRIDGE OVER AMTRAK, BRIDGE REPLACEMENT 8,385,000 19 (BASE CONSTRUCTION ALLOCATION - 20 $5,900,000) 21 (DESIGN AND CONTINGENCIES - $2,485,000) 22 (18) CITY OF PHILADELPHIA, KREWSTOWN ROAD, 23 BRIDGE OVER PENNYPACK CREEK, BRIDGE 24 REHABILITATION 730,000 25 (BASE CONSTRUCTION ALLOCATION - 26 $627,000) 27 (LAND ALLOCATION - $28,000) 28 (DESIGN AND CONTINGENCIES - $75,000) 29 (19) CITY OF PHILADELPHIA, SOUTH STREET 30 BRIDGE OVER SCHUYLKILL RIVER, BRIDGE 19990S0504B1019 - 469 -
1 REPLACEMENT 48,050,000 2 (BASE CONSTRUCTION ALLOCATION - 3 $40,000,000) 4 (DESIGN AND CONTINGENCIES - $8,050,000) 5 (20) CITY OF PHILADELPHIA, HUNTING PARK 6 AVENUE BRIDGE OVER CONRAIL AT 5TH 7 STREET, BRIDGE REMOVAL 1,200,000 8 (BASE CONSTRUCTION ALLOCATION - 9 $1,000,000) 10 (DESIGN AND CONTINGENCIES - $200,000) 11 (21) CITY OF PHILADELPHIA, WILLOW GROVE 12 AVENUE BRIDGE OVER SEPTA, BRIDGE 13 REPLACEMENT 2,715,000 14 (BASE CONSTRUCTION ALLOCATION - 15 $2,100,000) 16 (DESIGN AND CONTINGENCIES - $615,000) 17 (22) CITY OF PHILADELPHIA, WHARTON STREET 18 BRIDGE OVER CSX, BRIDGE REPLACEMENT 3,850,000 19 (BASE CONSTRUCTION ALLOCATION - 20 $3,000,000) 21 (DESIGN AND CONTINGENCIES - $850,000) 22 (23) CITY OF PHILADELPHIA, RISING SUN 23 AVENUE BRIDGE OVER CONRAIL AT 2ND 24 STREET, BRIDGE REMOVAL 1,200,000 25 (BASE CONSTRUCTION ALLOCATION - 26 $1,000,000) 27 (DESIGN AND CONTINGENCIES - $200,000) 28 (24) CITY OF PHILADELPHIA, ERIE AVENUE 29 BRIDGE OVER CONRAIL AT 4TH STREET, 30 BRIDGE REMOVAL 1,200,000 19990S0504B1019 - 470 -
1 (BASE CONSTRUCTION ALLOCATION - 2 $1,000,000) 3 (DESIGN AND CONTINGENCIES - $200,000) 4 (25) CITY OF PHILADELPHIA, ONTARIO STREET 5 BRIDGE OVER CONRAIL, BRIDGE REMOVAL 1,200,000 6 (BASE CONSTRUCTION ALLOCATION - 7 $1,000,000) 8 (DESIGN AND CONTINGENCIES - $200,000) 9 (26) CITY OF PHILADELPHIA, 41ST STREET 10 BRIDGE OVER AMTRAK, BRIDGE REPLACEMENT 8,575,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $6,500,000) 13 (DESIGN AND CONTINGENCIES - $2,075,000) 14 (27) CITY OF PHILADELPHIA, CEMETERY LANE 15 BRIDGE OVER CSX, BRIDGE REPLACEMENT 2,600,000 16 (BASE CONSTRUCTION ALLOCATION - 17 $2,000,000) 18 (DESIGN AND CONTINGENCIES - $600,000) 19 (28) CITY OF PHILADELPHIA, G STREET BRIDGE 20 OVER AMTRAK, BRIDGE REPLACEMENT 8,270,000 21 (BASE CONSTRUCTION ALLOCATION - 22 $5,800,000) 23 (DESIGN AND CONTINGENCIES - $2,470,000) 24 (29) CITY OF PHILADELPHIA, 59TH STREET 25 BRIDGE OVER AMTRAK, BRIDGE REPLACEMENT 8,500,000 26 (BASE CONSTRUCTION ALLOCATION - 27 $6,000,000) 28 (DESIGN AND CONTINGENCIES - $2,500,000) 29 (30) CITY OF PHILADELPHIA, TABOR AVENUE 30 BRIDGE OVER TACONY CREEK, BRIDGE 19990S0504B1019 - 471 -
1 REPLACEMENT 625,000 2 (BASE CONSTRUCTION ALLOCATION - 3 $500,000) 4 (DESIGN AND CONTINGENCIES - $125,000) 5 (31) CITY OF PHILADELPHIA, 61ST STREET 6 BRIDGE OVER AHSL, BRIDGE REPLACEMENT 3,850,000 7 (BASE CONSTRUCTION ALLOCATION - 8 $3,000,000) 9 (DESIGN AND CONTINGENCIES - $850,000) 10 (b) State Bridges 11 (1) SR 4007, Germantown Avenue Bridge, 12 Conrail Overpass, City of Philadelphia, 13 Bridge Removal 125,000 14 (Base Construction Allocation - 15 $100,000) 16 (Land Allocation - $10,000) 17 (Design and Contingencies - $15,000) 18 (2) SR 0076, Schuylkill Expressway Bridge 19 over Schuylkill River, City of 20 Philadelphia, Bridge Painting 2,580,000 21 (Base Construction Allocation - 22 $2,390,000) 23 (Design and Contingencies - $190,000) 24 (3) SR 2003, 5th Street Bridge over 25 Amtrak, City of Philadelphia, Bridge 26 Replacement 2,400,000 27 (Base Construction Allocation - 28 $2,000,000) 29 (Land Allocation - $200,000) 30 (Design and Contingencies - $200,000) 19990S0504B1019 - 472 -
1 (4) SR 3008, Chestnut Street Bridge over 2 Schuylkill River, City of Philadelphia, 3 Bridge Painting 477,000 4 (Base Construction Allocation - 5 $426,000) 6 (Design and Contingencies - $51,000) 7 (5) SR 3037, JFK Boulevard Bridge over 8 Schuylkill River, City of Philadelphia, 9 Bridge Painting 857,000 10 (Base Construction Allocation - 11 $794,000) 12 (Design and Contingencies - $63,000) 13 (6) SR 0095, Delaware River Expressway 14 over Westmoreland and Tioga Streets, 15 City of Philadelphia, Bridge 16 Rehabilitation 4,450,000 17 (Base Construction Allocation - 18 $4,200,000) 19 (Land Allocation - $50,000) 20 (Design and Contingencies - $200,000) 21 (7) SR 0003, Chestnut Street Bridge over 22 Amtrak, Schuylkill Expressway and 30th 23 Street, City of Philadelphia, Bridge 24 Replacement 11,800,000 25 (Base Construction Allocation - 26 $10,000,000) 27 (Land Allocation - $1,000,000) 28 (Design and Contingencies - $800,000) 29 (8) SR 0013, Girard Avenue Bridge over 30 Schuylkill Expressway, City of 19990S0504B1019 - 473 -
1 Philadelphia, Bridge Deck Replacement 1,733,000 2 (Base Construction Allocation - 3 $1,533,000) 4 (Land Allocation - $50,000) 5 (Design and Contingencies - $150,000) 6 (9) SR 0073, Cottman Avenue Bridge over 7 Conrail, City of Philadelphia, Bridge 8 Replacement 2,100,000 9 (Base Construction Allocation - 10 $1,500,000) 11 (Land Allocation - $300,000) 12 (Design and Contingencies - $300,000) 13 Section 56. Pike County. 14 (a) Local Bridges (Reserved) 15 (b) State Bridges 16 (1) SR 0390, Bridge Kill Creek Bridge, 17 North of SR 3002, Green Township, 18 Bridge Replacement 430,000 19 (Base Construction Allocation - 20 $340,000) 21 (Land Allocation - $10,000) 22 (Design and Contingencies - $80,000) 23 (2) SR 2011, Bridge over Outlet to Sawkill 24 Pond, South of TR 6, Dingman Township, 25 Bridge Replacement 355,000 26 (Base Construction Allocation - 27 $275,000) 28 (Land Allocation - $10,000) 29 (Design and Contingencies - $70,000) 30 (3) SR 0434, Shohola Bridge over Delaware 19990S0504B1019 - 474 -
1 River, Shohola Township and New York
2 State Line, Bridge Painting 2,200,000
3 (Base Construction Allocation -
4 $2,000,000)
5 (Design and Contingencies - $200,000)
6 (4) State Bridges, Countywide Bridge Zone
7 Painting, Bridge Painting 370,000
8 (Base Construction Allocation -
9 $350,000)
10 (Land Allocation - $10,000)
11 (Design and Contingencies - $10,000)
12 Section 57. Potter County.
13 (a) Local Bridges (Reserved) <--
14 (A) LOCAL BRIDGES <--
15 (1) HARRISON TOWNSHIP, T-487 OVER NORTH
16 BRANCH OF COWANESQUE CREEK, BRIDGE
17 REPLACEMENT 174,000
18 (BASE CONSTRUCTION ALLOCATION -
19 $149,000)
20 (LAND ALLOCATION - $10,000)
21 (DESIGN AND CONTINGENCIES - $15,000)
22 (b) State Bridges
23 (1) SR 3015, Baker Hollow Bridge over
24 Baker Run, Homer Township, Bridge
25 Replacement 290,000
26 (Base Construction Allocation -
27 $200,000)
28 (Land Allocation - $10,000)
29 (Design and Contingencies - $80,000)
30 (2) SR 0006, Bridge over Allegheny River,
19990S0504B1019 - 475 -
1 Coudersport Borough, Bridge Painting 325,000 2 (Base Construction Allocation - 3 $320,000) 4 (Design and Contingencies - $5,000) 5 (3) SR 4003, Bradley Run Bridge over 6 Bradley Run, Clara Township, Bridge 7 Replacement 520,000 8 (Base Construction Allocation - 9 $400,000) 10 (Land Allocation - $20,000) 11 (Design and Contingencies - $100,000) 12 (4) SR 4013, North Hollow Run Bridge over 13 Branch of North Hollow Run, Coudersport 14 Borough and Sweden Township, Bridge 15 Replacement 350,000 16 (Base Construction Allocation - 17 $260,000) 18 (Land Allocation - $10,000) 19 (Design and Contingencies - $80,000) 20 (5) SR 1003, Judson Run Bridge over Judson 21 Run, Pike Township, Bridge Replacement 340,000 22 (Base Construction Allocation - 23 $250,000) 24 (Land Allocation - $10,000) 25 (Design and Contingencies - $80,000) 26 (6) SR 1010, Genesee River Bridge over 27 Genesee River, Genesee Township, Bridge 28 Painting 68,000 29 (Base Construction Allocation - 30 $58,000) 19990S0504B1019 - 476 -
1 (Design and Contingencies - $10,000) 2 (7) SR 0044, BRIDGE OVER OSWAYO CREEK, <-- 3 SHINGLEHOUSE BOROUGH, BRIDGE 4 REPLACEMENT 2,016,000 5 (BASE CONSTRUCTION ALLOCATION - 6 $1,800,000) 7 (LAND ALLOCATION - $16,000) 8 (DESIGN AND CONTINGENCIES - $200,000) 9 Section 58. Schuylkill County. 10 (a) Local Bridges 11 (1) City of Pottsville, Washington Street 12 Bridge No.2 over Conrail and PA 61, 13 Bridge Replacement 2,225,000 14 (Base Construction Allocation - 15 $2,000,000) 16 (Land Allocation - $25,000) 17 (Design and Contingencies - $200,000) 18 (2) Pine Grove Township, Penn Central 19 Bridge over T-390, Bridge Removal 551,000 20 (Base Construction Allocation - 21 $435,000) 22 (Land Allocation - $50,000) 23 (Design and Contingencies - $66,000) 24 (3) Rush Township, T-862, Bridge No.42 25 over Pine Creek, Bridge Replacement 139,000 26 (Base Construction Allocation - 27 $121,000) 28 (Land Allocation - $6,000) 29 (Design and Contingencies - $12,000) 30 (4) St. Clair Borough, Russell Street 19990S0504B1019 - 477 -
1 Bridge over Mill Creek, Bridge 2 Replacement 223,000 3 (Base Construction Allocation - 4 $193,000) 5 (Land Allocation - $10,000) 6 (Design and Contingencies - $20,000) 7 (5) Upper Mahantongo Township, T-473, 8 Bridge over Mahantongo Creek, Bridge 9 Replacement 202,000 10 (Base Construction Allocation - 11 $175,000) 12 (Land Allocation - $9,000) 13 (Design and Contingencies - $18,000) 14 (6) East Brunswick Township, T-753, Bridge 15 over Indian Run, Bridge Replacement 400,000 16 (Base Construction Allocation - 17 $290,000) 18 (Land Allocation - $10,000) 19 (Design and Contingencies - $100,000) 20 (7) West Brunswick Township, County Bridge 21 No.94 over Schuylkill River, Bridge 22 Replacement 384,000 23 (Base Construction Allocation - 24 $384,000) 25 (8) Tremont Borough, Maple Street Bridge 26 No.22 over Goodspring Creek, Bridge 27 Replacement 214,000 28 (Base Construction Allocation - 29 $178,000) 30 (Design and Contingencies - $36,000) 19990S0504B1019 - 478 -
1 (9) Gilberton Borough, Bridge Street 2 Bridge over Mahanoy Creek, Bridge 3 Replacement 520,000 4 (Base Construction Allocation - 5 $400,000) 6 (Land Allocation - $20,000) 7 (Design and Contingencies - $100,000) 8 (10) Porter Township, T-416, Bridge No.79 9 over Wiconisco Creek, Bridge 10 Replacement 287,000 11 (Base Construction Allocation - 12 $250,000) 13 (Land Allocation - $12,000) 14 (Design and Contingencies - $25,000) 15 (11) Union Township, T-594, Bridge over 16 Little Catawissa Creek, Bridge 17 Replacement 296,000 18 (Base Construction Allocation - 19 $230,000) 20 (Land Allocation - $5,000) 21 (Design and Contingencies - $61,000) 22 (12) Deer Lake Borough, Drehersville Road 23 Bridge over Pine Creek, Bridge 24 Replacement 484,000 25 (Base Construction Allocation - 26 $324,000) 27 (Land Allocation - $10,000) 28 (Design and Contingencies - $150,000) 29 (13) Port Carbon Borough, Mill Street 30 Bridge No.106 over Schuylkill River, 19990S0504B1019 - 479 -
1 Bridge Replacement 1,050,000 2 (Base Construction Allocation - 3 $750,000) 4 (Land Allocation - $50,000) 5 (Design and Contingencies - $250,000) 6 (14) Hegins Township, T-478, Broad Street 7 Bridge over Pine Creek, Bridge 8 Replacement 357,000 9 (Base Construction Allocation - 10 $290,000) 11 (Land Allocation - $5,000) 12 (Design and Contingencies - $62,000) 13 (15) Frackville Borough, Spring Street 14 Reading Railroad Bridge, Bridge 15 Removal 112,000 16 (Base Construction Allocation - 17 $52,000) 18 (Land Allocation - $10,000) 19 (Design and Contingencies - $50,000) 20 (16) Eldred Township, T-383, Bridge over 21 Mahantango Creek, Bridge Replacement 121,000 22 (Base Construction Allocation - 23 $110,000) 24 (Design and Contingencies - $11,000) 25 (17) Port Clinton Borough, Broad Street, 26 County Bridge No.123 over Schuylkill 27 River, Bridge Replacement 828,000 28 (Base Construction Allocation - 29 $692,000) 30 (Land Allocation - $32,000) 19990S0504B1019 - 480 -
1 (Design and Contingencies - $104,000) 2 (18) South Manheim Township, T-676 County 3 Bridge No.112 over Bear Creek, Bridge 4 Replacement 470,000 5 (Base Construction Allocation - 6 $300,000) 7 (Land Allocation - $20,000) 8 (Design and Contingencies - $150,000) 9 (19) Port Carbon Borough, Washington 10 Street Bridge over Mill Creek, Bridge 11 Replacement 684,000 12 (Base Construction Allocation - 13 $564,000) 14 (Land Allocation - $20,000) 15 (Design and Contingencies - $100,000) 16 (20) City of Pottsville, Washington Street 17 over Conrail and SR 0061, Bridge 18 Rehabilitation 803,000 19 (Base Construction Allocation - 20 $669,000) 21 (Design and Contingencies - $134,000) 22 (21) St. Clair Borough, Russell Street 23 Bridge over Mill Creek, Bridge 24 Replacement 480,000 25 (Base Construction Allocation - 26 $350,000) 27 (Land Allocation - $10,000) 28 (Design and Contingencies - $120,000) 29 (22) North Union Township, T-455, Bridge 30 over Tomhicken Creek, Bridge 19990S0504B1019 - 481 -
1 Replacement 360,000 2 (Base Construction Allocation - 3 $250,000) 4 (Land Allocation - $10,000) 5 (Design and Contingencies - $100,000) 6 (23) West Brunswick Township, T-723, 7 Industrial Road over Pine Creek, Bridge 8 Replacement 584,000 9 (Base Construction Allocation - 10 $434,000) 11 (Land Allocation - $20,000) 12 (Design and Contingencies - $130,000) 13 (24) Landingville Borough, Canal Street 14 Bridge over Schuylkill River, Bridge 15 Replacement 810,000 16 (Base Construction Allocation - 17 $640,000) 18 (Land Allocation - $20,000) 19 (Design and Contingencies - $150,000) 20 (25) North Manheim Township, Memorial 21 Drive Overpass, Bridge Removal 295,000 22 (Base Construction Allocation - 23 $250,000) 24 (Land Allocation - $20,000) 25 (Design and Contingencies - $25,000) 26 (26) Branch Township, T-564, Bridge over 27 Muddy Creek, Bridge Replacement 360,000 28 (Base Construction Allocation - 29 $250,000) 30 (Land Allocation - $10,000) 19990S0504B1019 - 482 -
1 (Design and Contingencies - $100,000) 2 (27) Eldred Township, T-395, Bridge over 3 Little Mahantango Creek, Bridge 4 Replacement 362,000 5 (Base Construction Allocation - 6 $250,000) 7 (Land Allocation - $12,000) 8 (Design and Contingencies - $100,000) 9 (28) Orwigsburg Borough, Ridge Road 10 Bridge, Bridge Replacement 154,000 11 (Base Construction Allocation - 12 $122,000) 13 (Design and Contingencies - $32,000) 14 (29) WEST PENN TOWNSHIP, KITTATINNY BRIDGE <-- 15 OVER LIZARD CREEK, BRIDGE 16 REHABILITATION 170,000 17 (30) MAHANOY CITY BOROUGH, MARKET STREET 18 BRIDGE OVER MAHANOY CREEK, BRIDGE 19 REPLACEMENT 450,000 20 (31) PINE GROVE TOWNSHIP, T-649, BRIDGE 21 OVER LITTLE SWATARA CREEK, BRIDGE 22 REPLACEMENT 202,000 23 (32) TAMAQUA BOROUGH, SPRUCE STREET BRIDGE 24 OVER WABASH CREEK, BRIDGE 25 REHABILITATION 115,000 26 (b) State Bridges 27 (1) SR 0054, SR 0054 over Mahanoy Creek, 28 Mahanoy Township, Bridge Replacement 1,005,000 29 (Base Construction Allocation - 30 $770,000) 19990S0504B1019 - 483 -
1 (Design and Contingencies - $235,000) 2 (2) SR 0054, SR 0054 over Reading Blue 3 Mountain and Northern Railroad, Mahanoy 4 Township, Bridge Rehabilitation 650,000 5 (Base Construction Allocation - 6 $500,000) 7 (Design and Contingencies - $150,000) 8 (3) SR 0081, SR 0081 Southbound over 9 Swatara Creek, Pine Grove Township, 10 Bridge Rehabilitation 970,000 11 (Base Construction Allocation - 12 $745,000) 13 (Design and Contingencies - $225,000) 14 (4) SR 0081, SR 0081 Northbound over 15 Swatara Creek, Pine Grove Township, 16 Bridge Rehabilitation 970,000 17 (Base Construction Allocation - 18 $745,000) 19 (Design and Contingencies - $225,000) 20 (5) SR 0081, SR 0081 Southbound over SR 21 0443 and Exit Ramp 3, Pine Grove 22 Township, Bridge Rehabilitation 715,000 23 (Base Construction Allocation - 24 $550,000) 25 (Design and Contingencies - $165,000) 26 (6) SR 0081, SR 0081 Northbound over SR 27 0443 and Exit Ramp 31, Pine Grove 28 Township, Bridge Rehabilitation 515,000 29 (Base Construction Allocation - 30 $390,000) 19990S0504B1019 - 484 -
1 (Design and Contingencies - $125,000) 2 (7) SR 0081, I-81 Southbound over T-886, 3 Oak Grove Road, Pine Grove Township, 4 Bridge Rehabilitation 300,000 5 (Base Construction Allocation - 6 $200,000) 7 (Design and Contingencies - $100,000) 8 (8) SR 0081, I-81 Northbound over T-886, 9 Oak Grove Road, Pine Grove Township, 10 Bridge Rehabilitation 300,000 11 (Base Construction Allocation - 12 $200,000) 13 (Design and Contingencies - $100,000) 14 (9) SR 0061, Bridge over Mahannon Creek at 15 South Liberty Street, North Manheim 16 Township, Bridge Rehabilitation 265,000 17 (Base Construction Allocation - 18 $175,000) 19 (Design and Contingencies - $90,000) 20 (10) SR 0895, SR 0895 over Lizard Creek, 21 Village of Snyders, West Penn Township, 22 Bridge Rehabilitation 290,000 23 (Base Construction Allocation - 24 $190,000) 25 (Design and Contingencies - $100,000) 26 (11) SR 0901, SR 0901 over Mahanoy Creek, 27 Bridge Rehabilitation 680,000 28 (Base Construction Allocation - 29 $520,000) 30 (Design and Contingencies - $160,000) 19990S0504B1019 - 485 -
1 (12) SR 1011, SR 1011 over Big Creek, 2 Village of Brockton, Schuylkill 3 Township, Bridge Replacement 340,000 4 (Base Construction Allocation - 5 $160,000) 6 (Land Allocation - $55,000) 7 (Design and Contingencies - $125,000) 8 (13) SR 1011, SR 1011 over Locust Creek, 9 Ryan Township, Bridge Rehabilitation 365,000 10 (Base Construction Allocation - 11 $180,000) 12 (Land Allocation - $60,000) 13 (Design and Contingencies - $125,000) 14 (14) SR 2018, SR 2018 over Little 15 Schuylkill River, Drehersville, East 16 Brunswick Township, Bridge 17 Rehabilitation 385,000 18 (Base Construction Allocation - 19 $285,000) 20 (Design and Contingencies - $100,000) 21 (15) SR 4013, SR 4013 over Rausch Creek, 22 Hegins Township, Bridge Rehabilitation 280,000 23 (Base Construction Allocation - 24 $180,000) 25 (Design and Contingencies - $100,000) 26 (16) SR 4022, SR 4022 over Tributary of 27 Mahantango Creek, Eldred Township, 28 Bridge Replacement 310,000 29 (Base Construction Allocation - 30 $150,000) 19990S0504B1019 - 486 -
1 (Land Allocation - $50,000) 2 (Design and Contingencies - $110,000) 3 (17) SR 0209, Broad Street over Little 4 Schuylkill River, Tamaqua Borough, 5 Bridge Replacement 600,000 6 (Base Construction Allocation - 7 $360,000) 8 (Land Allocation - $100,000) 9 (Design and Contingencies - $140,000) 10 (18) SR 4022, Broad Street Bridge over 11 Panther Creek, Tamaqua Borough, Bridge 12 Replacement 1,780,000 13 (Base Construction Allocation - 14 $1,220,000) 15 (Land Allocation - $195,000) 16 (Design and Contingencies - $365,000) 17 (19) SR 4022, SR 4022 over Mahanoy Creek, 18 Village of Helfenstein, Eldred 19 Township, Bridge Replacement 1,170,000 20 (Base Construction Allocation - 21 $750,000) 22 (Land Allocation - $195,000) 23 (Design and Contingencies - $225,000) 24 (20) SR 0339, SR 0339 over Catawissa 25 Creek, North Union Township, Bridge 26 Replacement 984,000 27 (Base Construction Allocation - 28 $630,000) 29 (Land Allocation - $165,000) 30 (Design and Contingencies - $189,000) 19990S0504B1019 - 487 -
1 (21) SR 0443, Dock Street Bridge over 2 Tributary of Schuylkill River, Borough 3 of Schuylkill Haven, Bridge 4 Replacement 325,000 5 (Base Construction Allocation - 6 $150,000) 7 (Land Allocation - $50,000) 8 (Design and Contingencies - $125,000) 9 (22) SR 0895, SR 0895 over Schuylkill 10 River, Bridge Replacement 2,370,000 11 (Base Construction Allocation - 12 $1,480,000) 13 (Land Allocation - $390,000) 14 (Design and Contingencies - $500,000) 15 (23) SR 4011, SR 4011 over Pine Creek, 16 Hegins Township, Bridge Replacement 720,000 17 (Base Construction Allocation - 18 $450,000) 19 (Land Allocation - $120,000) 20 (Design and Contingencies - $150,000) 21 (24) SR 0895, Auburn Arch over Schuylkill 22 River, South Manheim Township, Bridge 23 Replacement 550,000 24 (Base Construction Allocation - 25 $350,000) 26 (Land Allocation - $50,000) 27 (Design and Contingencies - $150,000) 28 (25) SR 0061, Mady's Big Bridge over 29 Conrail, City of Pottsville, Bridge 30 Rehabilitation 1,323,000 19990S0504B1019 - 488 -
1 (Base Construction Allocation - 2 $1,202,000) 3 (Design and Contingencies - $121,000) 4 (26) SR 0061, Mady's Small Bridge over 5 Schuylkill River, City of Pottsville, 6 Bridge Rehabilitation 329,000 7 (Base Construction Allocation - 8 $299,000) 9 (Design and Contingencies - $30,000) 10 (27) SR 0125, Pitman Bridge over Little 11 Mahantango Creek, Eldred Township, 12 Bridge Replacement 480,000 13 (Base Construction Allocation - 14 $390,000) 15 (Land Allocation - $10,000) 16 (Design and Contingencies - $80,000) 17 (28) SR 0325, Bridge over Wiconisco Creek, 18 Porter Township, Bridge Replacement 1,175,000 19 (Base Construction Allocation - 20 $800,000) 21 (Land Allocation - $40,000) 22 (Design and Contingencies - $335,000) 23 (29) SR 0501, Bridge over Little Swatara 24 Creek, Pine Grove Township, Bridge 25 Replacement 1,400,000 26 (Base Construction Allocation - 27 $1,000,000) 28 (Land Allocation - $50,000) 29 (Design and Contingencies - $350,000) 30 (30) SR 0501, Small Bridge over Little 19990S0504B1019 - 489 -
1 Swatara Creek, Pine Grove Township, 2 Bridge Replacement 250,000 3 (Base Construction Allocation - 4 $150,000) 5 (Land Allocation - $10,000) 6 (Design and Contingencies - $90,000) 7 (31) SR 1013, Tuscarora Park Bridge over 8 Tributary of Locust Creek, Ryan 9 Township, Bridge Deck Replacement 485,000 10 (Base Construction Allocation - 11 $375,000) 12 (Land Allocation - $10,000) 13 (Design and Contingencies - $100,000) 14 (32) SR 1016, Lofty Bridge over Pocono 15 N.E. Railroad, Delano Township, Bridge 16 Replacement 715,000 17 (Base Construction Allocation - 18 $500,000) 19 (Land Allocation - $15,000) 20 (Design and Contingencies - $200,000) 21 (33) SR 2006, Bridge over Mahannon Creek, 22 West Brunswick Township, Bridge 23 Replacement 107,000 24 (Base Construction Allocation - 25 $92,000) 26 (Land Allocation - $5,000) 27 (Design and Contingencies - $10,000) 28 (34) SR 3003, Bridge over West Branch 29 Schuylkill River, North Manheim 30 Township, Bridge Deck Replacement 224,000 19990S0504B1019 - 490 -
1 (Base Construction Allocation - 2 $195,000) 3 (Design and Contingencies - $29,000) 4 (35) SR 3015, Bridge over Wiconisco Creek, 5 Porter Township, Bridge Replacement 200,000 6 (Base Construction Allocation - 7 $175,000) 8 (Land Allocation - $8,000) 9 (Design and Contingencies - $17,000) 10 (36) SR 4016, Bridge over Little 11 Mahantango Creek, Upper Mahantongo 12 Township, Bridge Replacement 165,000 13 (Base Construction Allocation - 14 $150,000) 15 (Design and Contingencies - $15,000) 16 (37) SR 4033, Bridge over Tomhicken Creek, 17 North Union Township, Bridge Deck 18 Replacement 350,000 19 (Base Construction Allocation - 20 $250,000) 21 (Design and Contingencies - $100,000) 22 (38) SR 4036, Ringtown Bridge over Little 23 Catawissa Creek, Union Township, Bridge 24 Replacement 240,000 25 (Base Construction Allocation - 26 $216,000) 27 (Land Allocation - $3,000) 28 (Design and Contingencies - $21,000) 29 (39) SR 4039, Haas Bridge over Mahantango 30 Creek, Upper Mahantongo Township, 19990S0504B1019 - 491 -
1 Bridge Replacement 153,000 2 (Base Construction Allocation - 3 $130,000) 4 (Land Allocation - $10,000) 5 (Design and Contingencies - $13,000) 6 (40) SR 0081, I-81 Bridges over SR 3013, 7 Tremont Township, Bridge Deck 8 Rehabilitation 1,900,000 9 (Base Construction Allocation - 10 $1,850,000) 11 (Design and Contingencies - $50,000) 12 (41) SR 0081, I-81 BRIDGE DECK <-- 13 REHABILITATION, LEBANON COUNTY LINE TO 14 RAVINE TOWNSHIP, PINE GROVE AND TREMONT 15 TOWNSHIPS, 8 BRIDGE DECKS, BRIDGE 16 REHABILITATION 1,060,000 17 (BASE CONSTRUCTION ALLOCATION - 18 $1,000,000) 19 (DESIGN AND CONTINGENCIES - $60,000) 20 Section 59. Snyder County. 21 (a) Local Bridges (Reserved) 22 (b) State Bridges 23 (1) SR 1011, Pine Street Bridge over Penns 24 Creek, Selinsgrove, Bridge Painting 1,150,000 25 (Base Construction Allocation - 26 $940,000) 27 (Land Allocation - $10,000) 28 (Design and Contingencies - $200,000) 29 (2) SR 3002, Bridge over Mahantango Creek, 30 1.5 Miles South of Meiserville, Perry 19990S0504B1019 - 492 -
1 and Chapman Townships Line, Bridge 2 Rehabilitation 1,425,000 3 (Base Construction Allocation - 4 $1,211,000) 5 (Design and Contingencies - $214,000) 6 (3) SR 4007, Middle Creek Bridge over 7 Middle Creek, North of SR 0522 and 8 South of SR 4012, Beaver Township, 9 Bridge Replacement 1,158,000 10 (Base Construction Allocation - 11 $926,000) 12 (Land Allocation - $58,000) 13 (Design and Contingencies - $174,000) 14 (4) SR 0522, Bridge over Middle Creek, 15 Bridge Painting 180,000 16 (Base Construction Allocation - 17 $170,000) 18 (Design and Contingencies - $10,000) 19 (5) SR 0035, SR 0035 over Tributary of 20 Mahantango Creek, Perry Township, 21 Bridge Replacement 815,000 22 (Base Construction Allocation - 23 $652,000) 24 (Land Allocation - $41,000) 25 (Design and Contingencies - $122,000) 26 (6) SR 0104, SR 0104 over Branch of 27 Mahantango Creek, Perry Township, 28 Bridge Replacement 430,000 29 (Base Construction Allocation - 30 $345,000) 19990S0504B1019 - 493 -
1 (Land Allocation - $20,000) 2 (Design and Contingencies - $65,000) 3 (7) SR 0104, SR 0104 over Middle Creek, 4 Franklin Township, Bridge Replacement 440,000 5 (Base Construction Allocation - 6 $350,000) 7 (Land Allocation - $20,000) 8 (Design and Contingencies - $70,000) 9 (8) SR 0522, SR 0522 over Tributary of 10 Middle Creek, Spring Township, Bridge 11 Replacement 500,000 12 (Base Construction Allocation - 13 $400,000) 14 (Land Allocation - $25,000) 15 (Design and Contingencies - $75,000) 16 (9) SR 0522, SR 0522 over Tributary of 17 Middle Creek, Spring Township, Bridge 18 Replacement 896,000 19 (Base Construction Allocation - 20 $717,000) 21 (Land Allocation - $45,000) 22 (Design and Contingencies - $134,000) 23 (10) SR 0522, SR 0522 over Tributary of 24 Middle Creek, Beavertown Borough, 25 Bridge Replacement 244,000 26 (Base Construction Allocation - 27 $195,000) 28 (Land Allocation - $12,000) 29 (Design and Contingencies - $37,000) 30 (11) SR 0522, SR 0522 over Tributary of 19990S0504B1019 - 494 -
1 Middle Creek, Beavertown Borough, 2 Bridge Replacement 245,000 3 (Base Construction Allocation - 4 $196,000) 5 (Land Allocation - $12,000) 6 (Design and Contingencies - $37,000) 7 (12) SR 0522, SR 0522 over Kern Run, 8 Beavertown Borough, Bridge Replacement 570,000 9 (Base Construction Allocation - 10 $456,000) 11 (Land Allocation - $29,000) 12 (Design and Contingencies - $85,000) 13 (13) SR 0522, SR 0522 over Penns Creek, 14 Selinsgrove Borough, Bridge 15 Replacement 3,167,000 16 (Base Construction Allocation - 17 $2,534,000) 18 (Land Allocation - $158,000) 19 (Design and Contingencies - $475,000) 20 (14) SR 1011, SR 1011 over Tributary of 21 Penns Creek, Jackson Township, Bridge 22 Replacement 300,000 23 (Base Construction Allocation - 24 $190,000) 25 (Land Allocation - $30,000) 26 (Design and Contingencies - $80,000) 27 (15) SR 2013, SR 2013 over Tributary of 28 Susquehanna River, Chapman Township, 29 Bridge Replacement 300,000 30 (Base Construction Allocation - 19990S0504B1019 - 495 -
1 $190,000) 2 (Land Allocation - $30,000) 3 (Design and Contingencies - $80,000) 4 (16) SR 3009, SR 3009 over Paxtonville 5 Creek, Franklin Township, Bridge 6 Replacement 1,512,000 7 (Base Construction Allocation - 8 $1,209,000) 9 (Land Allocation - $76,000) 10 (Design and Contingencies - $227,000) 11 (17) SR 1011, Pine Street Bridge over 12 Penns Creek, Selinsgrove Borough, 13 Bridge Replacement 3,100,000 14 (Base Construction Allocation - 15 $2,500,000) 16 (Land Allocation - $160,000) 17 (Design and Contingencies - $450,000) 18 (18) SR 3009, Bridge over Middle Creek, 19 Franklin Township, Bridge Painting 155,000 20 (Base Construction Allocation - 21 $140,000) 22 (Design and Contingencies - $15,000) 23 (19) SR 0522, Middle Creek Bridge No.2, 24 Beavertown Borough, Bridge Replacement 400,000 25 (Base Construction Allocation - 26 $250,000) 27 (Land Allocation - $50,00) 28 (Design and Contingencies - $100,000) 29 (20) SR 0104, Bridge over Mahantango 30 Creek, Perry Township, Bridge 19990S0504B1019 - 496 -
1 Replacement 430,000 2 (Base Construction Allocation - 3 $345,000) 4 (Land Allocation - $20,000) 5 (Design and Contingencies - $65,000) 6 (21) SR 1013, Bridge over Penns Creek, 7 Jackson Township, Bridge 8 Rehabilitation 2,200,000 9 (Base Construction Allocation - 10 $1,700,000) 11 (Land Allocation - $100,000) 12 (Design and Contingencies - $400,000) 13 (22) SR 0235, Bridge over Tributary of 14 Branch of Beaver Creek, Spring 15 Township, Bridge Replacement 565,000 16 (Base Construction Allocation - 17 $452,000) 18 (Land Allocation - $28,000) 19 (Design and Contingencies - $85,000) 20 (23) SR 1016, Bridge over Penns Creek, 21 Jackson Township, Bridge Replacement 1,700,000 22 (Base Construction Allocation - 23 $1,400,000) 24 (Land Allocation - $40,000) 25 (Design and Contingencies - $260,000) 26 Section 60. Somerset County. 27 (a) Local Bridges 28 (1) Middlecreek Township, T-338, Blue Hole 29 Creek Bridge over Blue Hole Creek, 30 Bridge Replacement 505,000 19990S0504B1019 - 497 -
1 (Base Construction Allocation - 2 $400,000) 3 (Land Allocation - $10,000) 4 (Design and Contingencies - $95,000) 5 (2) Paint Borough, Pennsylvania Railroad 6 Bridge over Bedford Street, Bridge 7 Replacement 350,000 8 (Base Construction Allocation - 9 $250,000) 10 (Land Allocation - $25,000) 11 (Design and Contingencies - $75,000) 12 (3) Shade Township, T-712, Lipinski Road 13 Bridge over Dark Shade Creek, Bridge 14 Replacement 560,000 15 (Base Construction Allocation - 16 $450,000) 17 (Land Allocation - $10,000) 18 (Design and Contingencies - $100,000) 19 (4) Somerset Borough, Church Street Bridge 20 over Parsons Run, Bridge Replacement 350,000 21 (Base Construction Allocation - 22 $250,000) 23 (Land Allocation - $25,000) 24 (Design and Contingencies - $75,000) 25 (5) Windber Borough, South 22nd Street 26 Bridge over Seese Run, Bridge 27 Replacement 350,000 28 (Base Construction Allocation - 29 $250,000) 30 (Land Allocation - $25,000) 19990S0504B1019 - 498 -
1 (Design and Contingencies - $75,000) 2 (6) Windber Borough, 24th Street Bridge 3 over Seese Run, Bridge Replacement 350,000 4 (Base Construction Allocation - 5 $250,000) 6 (Land Allocation - $25,000) 7 (Design and Contingencies - $75,000) 8 (7) Windber Borough, Village Street Bridge 9 over Seese Run, Bridge Replacement 350,000 10 (Base Construction Allocation - 11 $250,000) 12 (Land Allocation - $25,000) 13 (Design and Contingencies - $75,000) 14 (8) Summit Township, Keystone Viaduct over 15 SR 2006, CSX Mainline and Flaugherty 16 Creek, Bridge Rehabilitation 715,000 17 (Base Construction Allocation - 18 $663,000) 19 (Design and Contingencies - $52,000) 20 (b) State Bridges 21 (1) SR 0160, SR 0160 over Tributary of 22 Boones Run, Stoney Creek Township, 23 Bridge Replacement 580,000 24 (Base Construction Allocation - 25 $430,000) 26 (Land Allocation - $25,000) 27 (Design and Contingencies - $125,000) 28 (2) SR 0523, SR 0523 over Whites Creek, 29 Addison Township, Bridge Replacement 690,000 30 (Base Construction Allocation - 19990S0504B1019 - 499 -
1 $510,000) 2 (Land Allocation - $50,000) 3 (Design and Contingencies - $130,000) 4 (3) SR 1007, SR 1007 over Lambert Run, 5 Stoney Creek Township, Bridge 6 Replacement 490,000 7 (Base Construction Allocation - 8 $355,000) 9 (Land Allocation - $25,000) 10 (Design and Contingencies - $110,000) 11 (4) SR 1017, SR 1017 over Breastwork Run, 12 Allegheny Township, Bridge Replacement 650,000 13 (Base Construction Allocation - 14 $490,000) 15 (Land Allocation - $25,000) 16 (Design and Contingencies - $135,000) 17 (5) SR 1017, SR 1017 over Breastwork Run, 18 Allegheny Township, Bridge Replacement 580,000 19 (Base Construction Allocation - 20 $440,000) 21 (Land Allocation - $25,000) 22 (Design and Contingencies - $135,000) 23 (6) SR 1018, SR 1018 over Beaverdam Run, 24 Shade Township, Bridge Replacement 545,000 25 (Base Construction Allocation - 26 $400,000) 27 (Land Allocation - $25,000) 28 (Design and Contingencies - $120,000) 29 (7) SR 1018, SR 1018 over Beaverdam Run, 30 Shade Township, Bridge Replacement 515,000 19990S0504B1019 - 500 -
1 (Base Construction Allocation - 2 $375,000) 3 (Land Allocation - $25,000) 4 (Design and Contingencies - $115,000) 5 (8) SR 2005, SR 2005 over Elk Lick Creek, 6 Elk Lick Township, Bridge Replacement 520,000 7 (Base Construction Allocation - 8 $380,000) 9 (Land Allocation - $25,000) 10 (Design and Contingencies - $115,000) 11 (9) SR 4013, SR 4013 over North Branch of 12 Quemahoning Creek, Lincoln Township, 13 Bridge Replacement 585,000 14 (Base Construction Allocation - 15 $435,000) 16 (Land Allocation - $25,000) 17 (Design and Contingencies - $125,000) 18 (10) SR 4019, SR 4019 over Quemahoning 19 Creek, Quemahoning Township, Bridge 20 Replacement 800,000 21 (Base Construction Allocation - 22 $625,000) 23 (Land Allocation - $25,000) 24 (Design and Contingencies - $150,000) 25 (11) SR 3039, SR 3039 over Allen Creek, 26 Middlecreek Township, Bridge 27 Replacement 200,000 28 (Base Construction Allocation - 29 $150,000) 30 (Land Allocation - $5,000) 19990S0504B1019 - 501 -
1 (Design and Contingencies - $45,000) 2 (12) SR 3039, SR 3039 over Allen Creek, 3 Middlecreek Township, Bridge 4 Replacement 220,000 5 (Base Construction Allocation - 6 $150,000) 7 (Land Allocation - $10,000) 8 (Design and Contingencies - $60,000) 9 (13) SR 4001, SR 4001 over Clear Run, 10 Jefferson Township, Bridge Replacement 295,000 11 (Base Construction Allocation - 12 $200,000) 13 (Land Allocation - $10,000) 14 (Design and Contingencies - $85,000) 15 (14) SR 3039, Allen Creek Bridge No.3 over 16 Allen Creek, Middlecreek Township, 17 Bridge Replacement 425,000 18 (Base Construction Allocation - 19 $300,000) 20 (Land Allocation - $25,000) 21 (Design and Contingencies - $100,000) 22 (15) SR 4006, Quemahoning Creek Bridge 23 over Quemahoning Creek, Jenner 24 Township, Bridge Replacement 625,000 25 (Base Construction Allocation - 26 $425,000) 27 (Land Allocation - $75,000) 28 (Design and Contingencies - $125,000) 29 (16) SR 4026, Coxes Creek Bridge over East 30 Branch Coxes Creek, Somerset Borough, 19990S0504B1019 - 502 -
1 Bridge Replacement 835,000 2 (Base Construction Allocation - 3 $610,000) 4 (Land Allocation - $75,000) 5 (Design and Contingencies - $150,000) 6 (17) SR 4016, Bens Creek Bridge over South 7 Fork Bens Creek, Conemaugh Township, 8 Bridge Replacement 700,000 9 (Base Construction Allocation - 10 $515,000) 11 (Land Allocation - $50,000) 12 (Design and Contingencies - $135,000) 13 (18) SR 0030, BRIDGE OVER CALENDAR RUN, <-- 14 STONEY CREEK TOWNSHIP, BRIDGE 15 REHABILITATION 55,000 16 (BASE CONSTRUCTION ALLOCATION - 17 $40,000) 18 (LAND ALLOCATION - $1,000) 19 (DESIGN AND CONTINGENCIES - $14,000) 20 (19) SR 4029, BRIDGE OVER RIFFLE RUN, 21 CONEMAUGH TOWNSHIP, BRIDGE 22 REHABILITATION 64,000 23 (BASE CONSTRUCTION ALLOCATION - 24 $47,000) 25 (LAND ALLOCATION - $1,000) 26 (DESIGN AND CONTINGENCIES - $16,000) 27 Section 61. Sullivan County. 28 (a) Local Bridges 29 (1) Forks Township, T-448, Old TR 87 30 Bridge, County Bridge No.55 over Little 19990S0504B1019 - 503 -
1 Loyalsock Creek, Bridge Replacement 860,000 2 (Base Construction Allocation - 3 $700,000) 4 (Land Allocation - $10,000) 5 (Design and Contingencies - $150,000) 6 (2) Forks and Laporte Townships, T-346 7 over Loyalsock Creek, Bridge 8 Replacement 840,000 9 (Base Construction Allocation - 10 $730,000) 11 (Land Allocation - $10,000) 12 (Design and Contingencies - $100,000) 13 (b) State Bridges 14 (1) SR 0087, SR 0087 over Lick Run, Forks 15 Township, Bridge Replacement 635,000 16 (Base Construction Allocation - 17 $508,000) 18 (Land Allocation - $32,000) 19 (Design and Contingencies - $95,000) 20 (2) SR 0087, SR 0087 over Little Loyalsock 21 Creek, Cherry Township, Bridge 22 Replacement 655,000 23 (Base Construction Allocation - 24 $524,000) 25 (Land Allocation - $33,000) 26 (Design and Contingencies - $98,000) 27 (3) SR 0154, SR 0154 over Black Water Run, 28 Elkland Township, Bridge Replacement 194,000 29 (Base Construction Allocation - 30 $166,000) 19990S0504B1019 - 504 -
1 (Design and Contingencies - $28,000) 2 (4) SR 0154, SR 0154 over Kings Creek, 3 Elkland Township, Bridge Replacement 404,000 4 (Base Construction Allocation - 5 $323,000) 6 (Land Allocation - $20,000) 7 (Design and Contingencies - $61,000) 8 (5) SR 1012, SR 1012 over Little Loyalsock 9 Creek, Cherry Township, Bridge 10 Replacement 260,000 11 (Base Construction Allocation - 12 $208,000) 13 (Land Allocation - $13,000) 14 (Design and Contingencies - $39,000) 15 (6) SR 0154, Lincoln Falls Bridge over Elk 16 Creek, Elkland Township, Bridge 17 Replacement 1,750,000 18 (Base Construction Allocation - 19 $1,500,000) 20 (Land Allocation - $100,000) 21 (Design and Contingencies - $150,000) 22 (7) SR 0154, Hoagland Branch Bridge over 23 Hoagland Branch, Fox Township, Bridge 24 Replacement 539,000 25 (Base Construction Allocation - 26 $300,000) 27 (Land Allocation - $19,000) 28 (Design and Contingencies - $220,000) 29 Section 62. Susquehanna County. 30 (a) Local Bridges (Reserved) 19990S0504B1019 - 505 -
1 (b) State Bridges 2 (1) SR 0167, Owego Street Bridge over 3 Branch of Fall Brook, Bridgewater 4 Township, Bridge Replacement 413,000 5 (Base Construction Allocation - 6 $342,000) 7 (Land Allocation - $10,000) 8 (Design and Contingencies - $61,000) 9 (2) SR 1016, Salt Lick Creek Bridge over 10 Branch of Salt Lick Creek, New Milford 11 Township, Bridge Replacement 100,000 12 (Base Construction Allocation - 13 $86,000) 14 (Land Allocation - $3,000) 15 (Design and Contingencies - $11,000) 16 (3) SR 0081, Bridge over Trowbridge Creek, 17 1 Mile South of the Pennsylvania and 18 New York State Line, Great Bend 19 Township, Bridge Replacement 890,000 20 (Base Construction Allocation - 21 $700,000) 22 (Land Allocation - $10,000) 23 (Design and Contingencies - $180,000) 24 (4) SR 1017, Gulf Street Bridge, 0.5 Mile 25 North of SR 1015, Lanesboro Borough, 26 Bridge Replacement 305,000 27 (Base Construction Allocation - 28 $220,000) 29 (Land Allocation - $10,000) 30 (Design and Contingencies - $75,000) 19990S0504B1019 - 506 -
1 (5) SR 3003, Bridge over Transue Creek, 2 1.5 Miles South of SR 3005, Auburn 3 Township, Bridge Painting 60,000 4 (Base Construction Allocation - 5 $50,000) 6 (Design and Contingencies - $10,000) 7 (6) SR 3006, Bridge over White Creek, 1.5 8 Miles West of SR 3004, Springville 9 Township, Bridge Painting 70,000 10 (Base Construction Allocation - 11 $60,000) 12 (Design and Contingencies - $10,000) 13 (7) SR 0011, Bridge over Salt Lick Creek, 14 0.6 Mile North of TR 492, New Milford 15 Borough, Bridge Replacement 660,000 16 (Base Construction Allocation - 17 $510,000) 18 (Land Allocation - $20,000) 19 (Design and Contingencies - $130,000) 20 (8) SR 0367, Bridge over Tuscarora Creek, 21 North of SR 3005, Auburn Township, 22 Bridge Replacement 330,000 23 (Base Construction Allocation - 24 $265,000) 25 (Land Allocation - $10,000) 26 (Design and Contingencies - $65,000) 27 (9) SR 1010, Bridge over Bedbug Creek, 28 West of SR 1021, Oakland Township, 29 Bridge Replacement 325,000 30 (Base Construction Allocation - 19990S0504B1019 - 507 -
1 $250,000) 2 (Land Allocation - $10,000) 3 (Design and Contingencies - $65,000) 4 (10) SR 1010, Bridge over Tributary of 5 Susquehanna River, 2 Miles West of SR 6 1021, Great Bend Township, Bridge 7 Replacement 288,000 8 (Base Construction Allocation - 9 $220,000) 10 (Land Allocation - $10,000) 11 (Design and Contingencies - $58,000) 12 (11) SR 2046, Bridge over Branch of 13 Tunkhannock Creek, East of TR 92, 14 Gibson Township, Bridge Replacement 513,000 15 (Base Construction Allocation - 16 $400,000) 17 (Land Allocation - $10,000) 18 (Design and Contingencies - $103,000) 19 (12) SR 3017, Bridge over Thomas Creek, 20 Southeast of TR 29, Springville 21 Township, Bridge Replacement 285,000 22 (Base Construction Allocation - 23 $220,000) 24 (Land Allocation - $10,000) 25 (Design and Contingencies - $50,000) 26 (13) State Bridges, Countywide Bridge Zone 27 Painting, Bridge Painting 370,000 28 (Base Construction Allocation - 29 $350,000) 30 (Land Allocation - $10,000) 19990S0504B1019 - 508 -
1 (Design and Contingencies - $10,000) 2 (14) SR 0858, Branch of Apolacon Creek, 3 0.3 Mile North of SR 4013, Apolacon 4 Township, Bridge Replacement 220,000 5 (Base Construction Allocation - 6 $180,000) 7 (Land Allocation - $10,000) 8 (Design and Contingencies - $30,000) 9 (15) SR 1010, SR 1010 over Tributary of 10 Susquehanna River, Great Bend Township, 11 Bridge Replacement 230,000 12 (Base Construction Allocation - 13 $190,000) 14 (Land Allocation - $10,000) 15 (Design and Contingencies - $30,000) 16 (16) SR 1010, SR 1010 over Bedbug Creek, 17 Oakland Township, Bridge Replacement 270,000 18 (Base Construction Allocation - 19 $220,000) 20 (Land Allocation - $10,000) 21 (Design and Contingencies - $40,000) 22 (17) SR 2046, SR 2046 over Tunkhannock 23 Creek, Gibson Township, Bridge 24 Replacement 440,000 25 (Base Construction Allocation - 26 $370,000) 27 (Land Allocation - $10,000) 28 (Design and Contingencies - $60,000) 29 (18) SR 1011, Bridge over Hemlock Creek, 30 0.2 Mile North of SR 1009, Harmony 19990S0504B1019 - 509 -
1 Township, Bridge Replacement 330,000 2 (Base Construction Allocation - 3 $280,000) 4 (Land Allocation - $10,000) 5 (Design and Contingencies - $40,000) 6 (19) SR 4002, Bridge over Choconut Creek, 7 0.1 Mile East of TR 267, Choconut 8 Township, Bridge Replacement 290,000 9 (Base Construction Allocation - 10 $240,000) 11 (Land Allocation - $10,000) 12 (Design and Contingencies - $40,000) 13 (20) SR 3009, Bridge over White Creek, 1.8 14 Miles North of County Line, Auburn 15 Township, Bridge Replacement 240,000 16 (Base Construction Allocation - 17 $200,000) 18 (Land Allocation - $10,000) 19 (Design and Contingencies - $30,000) 20 (21) SR 3023, Bridge over East Branch of 21 Wyalusing Creek, 0.1 Mile South of TR 22 706, Rush Township, Bridge Replacement 23 and Intersection Realignment 1,520,000 24 (Base Construction Allocation - 25 $1,300,000) 26 (Land Allocation - $20,000) 27 (Design and Contingencies - $200,000) 28 (22) SR 4008, Bridge over Laurel Lake 29 Creek, 1.7 Miles East of TR 167, Silver 30 Lake Township, Bridge Replacement 430,000 19990S0504B1019 - 510 -
1 (Base Construction Allocation - 2 $360,000) 3 (Land Allocation - $10,000) 4 (Design and Contingencies - $60,000) 5 (23) SR 0000, CEMETERY ROAD BRIDGE OVER <-- 6 DEWING CREEK, LITTLE MEADOWS BOROUGH, 7 BRIDGE REPLACEMENT 300,000 8 (BASE CONSTRUCTION ALLOCATION - 9 $250,000) 10 (LAND ALLOCATION - $10,000) 11 (DESIGN AND CONTINGENCIES - $40,000) 12 (24) SR 1012, BRIDGE OVER SALT LICK CREEK, 13 NEW MILFORD TOWNSHIP, BRIDGE 14 REHABILITATION 95,000 15 (BASE CONSTRUCTION ALLOCATION - 16 $75,000) 17 (LAND ALLOCATION - $5,000) 18 (DESIGN AND CONTINGENCIES - $15,000) 19 Section 63. Tioga County. 20 (a) Local Bridges 21 (1) Elkland Borough, North Buffalo Street 22 over Camp Brook Creek, Bridge 23 Replacement 510,000 24 (Base Construction Allocation) - 25 $360,000) 26 (Land Allocation - $20,000) 27 (Design and Contingencies - $130,000) 28 (2) Middlebury Township, T-658 (Monkey Run 29 Road), Bridge over Tributary of Losey 30 Creek, Bridge Replacement 390,000 19990S0504B1019 - 511 -
1 (Base Construction Allocation - 2 $250,000) 3 (Land Allocation - $10,000) 4 (Design and Contingencies - $130,000) 5 (3) Farmington Township, T-758 (Short Hole 6 Road), Bridge over Thorn Bottom Creek, 7 Bridge Replacement 390,000 8 (Base Construction Allocation - 9 $250,000) 10 (Land Allocation - $10,000) 11 (Design and Contingencies - $130,000) 12 (4) Tioga Township, T-726, Upper Bear 13 Creek Road Bridge over Crooked Creek, 14 Bridge Replacement 1,550,000 15 (Base Construction Allocation - 16 $1,250,000) 17 (Design and Contingencies - $300,000) 18 (5) FARMINGTON TOWNSHIP, T-657, BRIDGE <-- 19 NO.6 OVER ELKHORN CREEK, BRIDGE 20 REPLACEMENT 430,000 21 (BASE CONSTRUCTION ALLOCATION - 22 $300,000) 23 (LAND ALLOCATION - $30,000) 24 (DESIGN AND CONTINGENCIES - $100,000) 25 (6) FARMINGTON TOWNSHIP, T-657, BRIDGE 26 OVER ELKHORN CREEK, BRIDGE REPLACEMENT 430,000 27 (BASE CONSTRUCTION ALLOCATION - 28 $300,000) 29 (LAND ALLOCATION - $30,000) 30 (DESIGN AND CONTINGENCIES - $100,000) 19990S0504B1019 - 512 -
1 (7) JACKSON TOWNSHIP, T-952, BRIDGE OVER 2 HAMMOND CREEK, BRIDGE REPLACEMENT 610,000 3 (BASE CONSTRUCTION ALLOCATION - 4 $480,000) 5 (LAND ALLOCATION - $30,000) 6 (DESIGN AND CONTINGENCIES - $100,000) 7 (8) SULLIVAN TOWNSHIP, T-469, BRIDGE OVER 8 CORY CREEK, BRIDGE REPLACEMENT 225,000 9 (BASE CONSTRUCTION ALLOCATION - 10 $125,000) 11 (LAND ALLOCATION - $20,000) 12 (DESIGN AND CONTINGENCIES - $80,000) 13 (b) State Bridges 14 (1) SR 0249, Losey Creek Bridge, South of 15 SR 4017 in Village of Keeneyville, 16 Middlebury Township, Bridge 17 Rehabilitation 250,000 18 (Base Construction Allocation - 19 $210,000) 20 (Land Allocation - $5,000) 21 (Design and Contingencies - $35,000) 22 (2) SR 1002, Corey Creek Bridge over Corey 23 Creek, Northeast of Mansfield, Bridge 24 Replacement 346,000 25 (Base Construction Allocation - 26 $277,000) 27 (Land Allocation - $17,000) 28 (Design and Contingencies - $52,000) 29 (3) SR 3001, Kettle Creek Bridge, 11 Miles 30 South of Watrous, Bridge Replacement 366,000 19990S0504B1019 - 513 -
1 (Base Construction Allocation - 2 $293,000) 3 (Land Allocation - $18,000) 4 (Design and Contingencies - $55,000) 5 (4) SR 3023, Heise Run North Bridge, West 6 of Wellsboro, Bridge Replacement 240,000 7 (Base Construction Allocation - 8 $192,000) 9 (Land Allocation - $12,000) 10 (Design and Contingencies - $36,000) 11 (5) SR 4017, Holden Creek Bridge No.1, 12 Bridge Replacement 584,000 13 (Base Construction Allocation - 14 $467,000) 15 (Land Allocation - $29,000) 16 (Design and Contingencies - $88,000) 17 (6) SR 4024, Elkhorn Creek Bridge, West of 18 Tioga Borough, Bridge Replacement 451,000 19 (Base Construction Allocation - 20 $401,000) 21 (Land Allocation - $15,000) 22 (Design and Contingencies - $35,000) 23 (7) SR 3007, Bridge over Stoney Fork 24 Creek, Bridge Painting 160,000 25 (Base Construction Allocation - 26 $150,000) 27 (Design and Contingencies - $10,000) 28 (8) SR 4017, Bridge over Cowanesque River, 29 Bridge Painting 475,000 30 (Base Construction Allocation - 19990S0504B1019 - 514 -
1 $465,000) 2 (Design and Contingencies - $10,000) 3 (9) SR 0049, SR 0049 over Cowanesque 4 River, Westfield Township, Bridge 5 Replacement 1,802,000 6 (Base Construction Allocation - 7 $1,442,000) 8 (Land Allocation - $90,000) 9 (Design and Contingencies - $270,000) 10 (10) SR 0287, SR 0287 over Wellsboro 11 Street - Conrail, Tioga Township, 12 Bridge Replacement 1,709,000 13 (Base Construction Allocation - 14 $1,367,000) 15 (Land Allocation - $86,000) 16 (Design and Contingencies - $256,000) 17 (11) SR 0328, SR 0328 over Hammond Creek, 18 Jackson Township, Bridge Replacement 256,000 19 (Base Construction Allocation - 20 $205,000) 21 (Land Allocation - $13,000) 22 (Design and Contingencies - $38,000) 23 (12) SR 0349, SR 0349 over Mill Creek, 24 Clymer Township, Bridge Replacement 1,000,000 25 (Base Construction Allocation - 26 $800,000) 27 (Land Allocation - $50,000) 28 (Design and Contingencies - $150,000) 29 (13) SR 1030, SR 1030 over Conrail, Tioga 30 Township, Bridge Replacement 561,000 19990S0504B1019 - 515 -
1 (Base Construction Allocation - 2 $449,000) 3 (Land Allocation - $28,000) 4 (Design and Contingencies - $84,000) 5 (14) SR 2017, SR 2017 over Mill Creek, 6 Union Township, Bridge Replacement 584,000 7 (Base Construction Allocation - 8 $467,000) 9 (Land Allocation - $27,000) 10 (Design and Contingencies - $88,000) 11 (15) SR 4017, SR 4017 Bridge No.2 over 12 Holden Creek, Osceola Township, Bridge 13 Replacement 542,000 14 (Base Construction Allocation - 15 $434,000) 16 (Land Allocation - $27,000) 17 (Design and Contingencies - $81,000) 18 (16) SR 0015, Mill Creek Bridge spanning 19 Tioga Dam Impoundment at Confluence, 20 Two-Lane Bridge Construction 6,875,000 21 (Base Construction Allocation - 22 $6,250,000) 23 (Design and Contingencies - $625,000) 24 (17) PA 249, Bridge over Crooked Creek, 25 Village of Little Marsh, Chatham 26 Township, Bridge Replacement 1,250,000 27 (Base Construction Allocation - 28 $1,000,000) 29 (Land Allocation - $50,000) 30 (Design and Contingencies - $200,000) 19990S0504B1019 - 516 -
1 (18) SR 1032, Crooked Creek Bridge over 2 Crooked Creek, Tioga Township, Bridge 3 Replacement 1,550,000 4 (Base Construction Allocation - 5 $1,250,000) 6 (Land Allocation - $50,000) 7 (Design and Contingencies - $250,000) 8 Section 64. Union County. 9 (a) Local Bridges (Reserved) 10 (b) State Bridges 11 (1) SR 0192, Rapid Run Bridge II over 12 Rapid Run, Lewis Township, Bridge 13 Rehabilitation 250,000 14 (Base Construction Allocation - 15 $200,000) 16 (Land Allocation - $13,000) 17 (Design and Contingencies - $37,000) 18 (2) SR 0192, Rapid Run Bridge I over Rapid 19 Run, Lewis Township, Bridge 20 Rehabilitation 205,000 21 (Base Construction Allocation - 22 $164,000) 23 (Land Allocation - $10,000) 24 (Design and Contingencies - $31,000) 25 (3) SR 0044, Bridge over Spring Creek, 26 Gregg Township, Bridge Painting 110,000 27 (Base Construction Allocation - 28 $100,000) 29 (Design and Contingencies - $10,000) 30 (4) SR 1004, Bridge over Little Buffalo 19990S0504B1019 - 517 -
1 Creek, Kelly Township, Bridge Painting 75,000 2 (Base Construction Allocation - 3 $65,000) 4 (Design and Contingencies - $10,000) 5 (5) SR 1012, Bridge over White Deer Hole 6 Creek, Gregg Township, Bridge Painting 160,000 7 (Base Construction Allocation - 8 $150,000) 9 (Design and Contingencies - $10,000) 10 (6) SR 0235, SR 0235 over Laurel Run, 11 Hartley Township, Bridge Replacement 1,118,000 12 (Base Construction Allocation - 13 $894,000) 14 (Land Allocation - $56,000) 15 (Design and Contingencies - $168,000) 16 (7) SR 0235, SR 0235 over Buffalo Creek, 17 Lewis Township, Bridge Replacement 395,000 18 (Base Construction Allocation - 19 $316,000) 20 (Land Allocation - $20,000) 21 (Design and Contingencies - $59,000) 22 (8) US 15, Bridge over White Deer Hole 23 Creek, Village of Allenwood, Gregg 24 Township, Deck Replacement 1,850,000 25 (Base Construction Allocation - 26 $1,500,000) 27 (Land Allocation - $50,000) 28 (Design and Contingencies - $300,000) 29 (9) US 15, Bridge over SR 1004, Village of 30 West Milton, Kelly Township, 19990S0504B1019 - 518 -
1 Superstructure Replacement 2,450,000 2 (Base Construction Allocation - 3 $2,000,000) 4 (Land Allocation - $50,000) 5 (Design and Contingencies - $400,000) 6 (10) US 15, Bridge over White Deer Creek, 7 White Deer Township, Deck Replacement 2,430,000 8 (Base Construction Allocation - 9 $2,000,000) 10 (Land Allocation - $30,000) 11 (Design and Contingencies - $400,000) 12 (11) US 15, Bridge over SR 1010, White 13 Deer Township, Deck Replacement 1,230,000 14 (Base Construction Allocation - 15 $1,000,000) 16 (Land Allocation - $30,000) 17 (Design and Contingencies - $200,000) 18 (12) SR 3003, Bridge over Buffalo Creek, 19 Lewis Township, Bridge Replacement 450,000 20 (Base Construction Allocation - 21 $350,000) 22 (Land Allocation - $20,000) 23 (Design and Contingencies - $80,000) 24 (13) SR 3004, Bridge over Laurel Run, 25 Hartley Township, Bridge Replacement 723,000 26 (Base Construction Allocation - 27 $578,000) 28 (Land Allocation - $36,000) 29 (Design and Contingencies - $109,000) 30 (14) SR 3004, Bridge over Cedar Run, 19990S0504B1019 - 519 -
1 Limestone Township, Bridge Replacement 380,000 2 (Base Construction Allocation - 3 $280,000) 4 (Land Allocation - $20,000) 5 (Design and Contingencies - $80,000) 6 (15) SR 3003, Eighth Street Bridge, 7 Mifflinburg Borough, Bridge 8 Replacement 630,000 9 (Base Construction Allocation - 10 $504,000) 11 (Land Allocation - $32,000) 12 (Design and Contingencies - $94,000) 13 (16) SR 0192, Rapid Run Bridge III over 14 Rapid Run, Hartley Township, Bridge 15 Replacement 660,000 16 (Base Construction Allocation - 17 $528,000) 18 (Land Allocation - $33,000) 19 (Design and Contingencies - $99,000) 20 Section 65. Venango County. 21 (a) Local Bridges 22 (1) Richland Township, T-552 over Mill 23 Creek, Bridge Replacement 475,000 24 (Base Construction Allocation - 25 $355,000) 26 (Land Allocation - $10,000) 27 (Design and Contingencies - $110,000) 28 (2) Richland Township, T-361 over Unnamed 29 Tributary of Mill Creek, Bridge 30 Replacement 360,000 19990S0504B1019 - 520 -
1 (Base Construction Allocation - 2 $265,000) 3 (Land Allocation - $10,000) 4 (Design and Contingencies - $85,000) 5 (3) Richland Township, T-377 over Sage 6 Run, Bridge Replacement 385,000 7 (Base Construction Allocation - 8 $290,000) 9 (Land Allocation - $10,000) 10 (Design and Contingencies - $85,000) 11 (4) Pinegrove Township, T-628 over East 12 Sandy Creek, Bridge Replacement 363,000 13 (Base Construction Allocation - 14 $307,000) 15 (Land Allocation - $6,000) 16 (Design and Contingencies - $50,000) 17 (5) Cranberry Township, T-679 over Branch 18 of Sage Run, Bridge Replacement 106,000 19 (Base Construction Allocation - 20 $100,000) 21 (Land Allocation - $1,000) 22 (Design and Contingencies - $5,000) 23 (6) Oakland Township, T-567 over Branch of 24 Two Mile Run, Bridge Replacement 106,000 25 (Base Construction Allocation - 26 $100,000) 27 (Land Allocation - $1,000) 28 (Design and Contingencies - $5,000) 29 (7) Rockland Township, T-512 over East 30 Sandy Creek, Bridge Replacement 360,000 19990S0504B1019 - 521 -
1 (Base Construction Allocation - 2 $300,000) 3 (Land Allocation - $10,000) 4 (Design and Contingencies - $50,000) 5 (8) Pinegrove Township, T-628 over East 6 Sandy Creek, Bridge Replacement 510,000 7 (Base Construction Allocation - 8 $400,000) 9 (Land Allocation - $10,000) 10 (Design and Contingencies - $100,000) 11 (9) Cherrytree Township, T-520, Baker Road 12 Bridge over Prather Creek, Bridge 13 Replacement 360,000 14 (10) Cherrytree Township, T-649, Fairview 15 Road Bridge over Branch of Prather 16 Creek, Bridge Replacement 360,000 17 (11) CANAL TOWNSHIP, T-323, BRIDGE OVER <-- 18 TRIBUTARY OF MCCUNE RUN, BRIDGE 19 REPLACEMENT 150,000 20 (12) CANAL TOWNSHIP, T-323, BRIDGE OVER 21 MCCUNE RUN, BRIDGE REPLACEMENT 150,000 22 (13) CANAL TOWNSHIP, T-323, BRIDGE OVER 23 TRIBUTARY OF MCCUNE RUN, BRIDGE 24 REPLACEMENT 150,000 25 (14) CANAL TOWNSHIP, T-354, BRIDGE OVER 26 TRIBUTARY OF WARDEN RUN, BRIDGE 27 REPLACEMENT 150,000 28 (15) CANAL TOWNSHIP, T-354, BRIDGE OVER 29 WARDEN RUN, BRIDGE REPLACEMENT 150,000 30 (16) CORNPLANTER TOWNSHIP, T-569, BRIDGE 19990S0504B1019 - 522 -
1 OVER CHERRY RUN, BRIDGE REPLACEMENT 242,000 2 (17) CHERRYTREE TOWNSHIP, T-649, BRIDGE 3 OVER PRATHER CREEK, BRIDGE REPLACEMENT 200,000 4 (18) CHERRYTREE TOWNSHIP, T-520, BRIDGE 5 OVER PRATHER CREEK, BRIDGE REPLACEMENT 200,000 6 (19) COOPERSTOWN BOROUGH, T-372, BRIDGE 7 OVER LAKE CREEK, BRIDGE REPLACEMENT 370,000 8 (20) CORNPLANTER TOWNSHIP, T-564, BRIDGE 9 OVER WYKLE RUN, BRIDGE REPLACEMENT 417,000 10 (21) CRANBERRY TOWNSHIP, T-494, BRIDGE 11 OVER SAGE RUN, BRIDGE REPLACEMENT 240,000 12 (22) FRENCHCREEK TOWNSHIP, T-318, BRIDGE 13 OVER LITTLE SANDY CREEK, BRIDGE 14 REPLACEMENT 300,000 15 (23) FRENCHCREEK TOWNSHIP, T-346, BRIDGE 16 OVER LITTLE SANDY CREEK, BRIDGE 17 REPLACEMENT 285,000 18 (24) FRENCHCREEK TOWNSHIP, T-304, BRIDGE 19 OVER LITTLE SANDY CREEK, BRIDGE 20 REPLACEMENT 302,000 21 (25) FRENCHCREEK TOWNSHIP, T-334, BRIDGE 22 OVER LITTLE SANDY CREEK, BRIDGE 23 REPLACEMENT 275,000 24 (26) MINERAL TOWNSHIP, T-308, BRIDGE OVER 25 BIG SANDY CREEK, BRIDGE REPLACEMENT 505,000 26 (27) OIL CREEK TOWNSHIP, T-635, BRIDGE 27 OVER OIL CREEK, BRIDGE REPLACEMENT 840,000 28 (28) POLK BOROUGH, CHURCH AVENUE BRIDGE 29 OVER SANDY CREEK, BRIDGE REPLACEMENT 600,000 30 (29) ROCKLAND TOWNSHIP, T-522, BRIDGE OVER 19990S0504B1019 - 523 -
1 MILL CREEK, BRIDGE REPLACEMENT 300,000 2 (30) SUGARCREEK BOROUGH, T-529, BRIDGE 3 OVER TWO MILE RUN, BRIDGE REPLACEMENT 117,000 4 (31) SUGARCREEK BOROUGH, SLEEPY HOLLOW 5 ROAD BRIDGE OVER TRIBUTARY OF SUGAR 6 CREEK, BRIDGE REPLACEMENT 135,000 7 (32) SUGARCREEK TOWNSHIP, T-529, BRIDGE 8 OVER SUGAR CREEK, BRIDGE 9 REHABILITATION 9,360,000 10 (b) State Bridges 11 (1) SR 4001, SR 4001 over Two Mile Run 12 West Branch, Sugarcreek Borough, Bridge 13 Replacement 205,000 14 (Base Construction Allocation - 15 $150,000) 16 (Land Allocation - $5,000) 17 (Design and Contingencies - $50,000) 18 (2) SR 0227, SR 0227 over Cherry Run, 19 Cornplanter Township, Bridge 20 Replacement 280,000 21 (Base Construction Allocation - 22 $200,000) 23 (Land Allocation - $20,000) 24 (Design and Contingencies - $60,000) 25 (3) SR 0322, SR 0322 over Halls Run, 26 Cranberry Township, Bridge Replacement 2,600,000 27 (Base Construction Allocation - 28 $2,000,000) 29 (Land Allocation - $100,000) 30 (Design and Contingencies - $500,000) 19990S0504B1019 - 524 -
1 (4) SR 3009, SR 3009 over I-80, Scrubgrass 2 Township, Bridge Replacement 810,000 3 (Base Construction Allocation - 4 $700,000) 5 (Land Allocation - $10,000) 6 (Design and Contingencies - $100,000) 7 (5) SR 3017, SR 3017 over Warden Run, 8 Canal Township, Bridge Replacement 920,000 9 (Base Construction Allocation - 10 $800,000) 11 (Land Allocation - $20,000) 12 (Design and Contingencies - $100,000) 13 (6) SR 0038, SR 0038 over Pine Run, 14 Richland Township, Bridge 15 Rehabilitation 110,000 16 (Base Construction Allocation - 17 $100,000) 18 (Design and Contingencies - $10,000) 19 (7) SR 3025, SR 3025 over Hays Run, City 20 of Oil City, Bridge Replacement 340,000 21 (Base Construction Allocation - 22 $300,000) 23 (Land Allocation - $5,000) 24 (Design and Contingencies - $35,000) 25 (8) SR 0062, Washington Crossing Bridge 26 over French Creek and Conrail, City of 27 Franklin, Bridge Painting 920,000 28 (Base Construction Allocation - 29 $800,000) 30 (Land Allocation - $40,000) 19990S0504B1019 - 525 -
1 (Design and Contingencies - $80,000) 2 (9) SR 0062, Sage Run Bridge No.4 over 3 Sage Run, Cranberry Township, Bridge 4 Replacement 660,000 5 (Base Construction Allocation - 6 $560,000) 7 (Land Allocation - $20,000) 8 (Design and Contingencies - $80,000) 9 (10) SR 0062, Sage Run Bridge No.7 over 10 Sage Run, Cranberry Township, Bridge 11 Replacement 330,000 12 (Base Construction Allocation - 13 $250,000) 14 (Land Allocation - $20,000) 15 (Design and Contingencies - $60,000) 16 (11) SR 0322, 13th Street Bridge over 17 French Creek, City of Franklin, Bridge 18 Rehabilitation 1,620,000 19 (Base Construction Allocation - 20 $1,500,000) 21 (Land Allocation - $40,000) 22 (Design and Contingencies - $80,000) 23 (12) SR 1004, Pithole Stone Arch Bridge 24 over Pithole Creek, Cornplanter 25 Township, Bridge Rehabilitation 400,000 26 (Base Construction Allocation - 27 $280,000) 28 (Land Allocation - $20,000) 29 (Design and Contingencies - $100,000) 30 (13) SR 4010, Twin Bridge over Sugar 19990S0504B1019 - 526 -
1 Creek, Sugarcreek Borough, Bridge 2 Replacement 1,050,000 3 (Base Construction Allocation - 4 $900,000) 5 (Land Allocation - $50,000) 6 (Design and Contingencies - $100,000) 7 (14) SR 1006, PITHOLE CREEK BRIDGE NO.4, <-- 8 ALLEGHENY TOWNSHIP, BRIDGE REPLACEMENT 300,000 9 (BASE CONSTRUCTION ALLOCATION - 10 $200,000) 11 (LAND ALLOCATION - $20,000) 12 (DESIGN AND CONTINGENCIES - $80,000) 13 (15) SR 4022, BRIDGE OVER PORTER RUN, PLUM 14 TOWNSHIP, BRIDGE REPLACEMENT 500,000 15 (BASE CONSTRUCTION ALLOCATION - 16 $400,000) 17 (LAND ALLOCATION - $20,000) 18 (DESIGN AND CONTINGENCIES - $80,000) 19 (16) SR 1006, BRIDGE OVER PITHOLE CREEK, 20 ALLEGHENY TOWNSHIP, BRIDGE REPLACEMENT 300,000 21 (17) SR 4008, BRIDGE OVER MCCUNE RUN, 22 CANAL TOWNSHIP, BRIDGE REPLACEMENT 450,000 23 (18) SR 3017, UTICA ROAD BRIDGE OVER 24 WARDEN RUN, CANAL TOWNSHIP, BRIDGE 25 REPLACEMENT 420,000 26 (19) SR 3005, BRIDGE OVER SCRUBGRASS 27 CREEK, CLINTON TOWNSHIP, BRIDGE 28 REPLACEMENT 1,250,000 29 (20) SR 0208, BRIDGE OVER I-80, CLINTON 30 TOWNSHIP, BRIDGE REPLACEMENT 5,000,000 19990S0504B1019 - 527 -
1 (21) SR 0080, I-80 BRIDGE OVER TRIBUTARY 2 OF SCRUBGRASS CREEK, CLINTONVILLE 3 BOROUGH, BRIDGE REPLACEMENT 300,000 4 (22) SR 0008, BRIDGE OVER OIL CREEK, 5 CORNPLANTER TOWNSHIP, BRIDGE 6 REHABILITATION 746,000 7 (23) SR 1004, BRIDGE OVER OIL CREEK, 8 CORNPLANTER TOWNSHIP, BRIDGE 9 REPLACEMENT 2,500,000 10 (24) SR 1004, BRIDGE OVER PITTHOLE CREEK, 11 CORNPLANTER TOWNSHIP, BRIDGE 12 REHABILITATION 600,000 13 (25) SR 1006, 27TH STREET BRIDGE OVER 14 PITHOLE CREEK, CORNPLANTER TOWNSHIP, 15 BRIDGE REPLACEMENT 200,000 16 (26) SR 0227, BRIDGE NO.3 OVER CHERRY RUN, 17 CORNPLANTER TOWNSHIP, BRIDGE 18 REPLACEMENT 500,000 19 (27) SR 0062, BRIDGE NO.7 OVER SAGE RUN, 20 CRANBERRY TOWNSHIP, BRIDGE REPLACEMENT 900,000 21 (28) SR 0062, BRIDGE NO.5 OVER SAGE RUN, 22 CRANBERRY TOWNSHIP, BRIDGE REPLACEMENT 500,000 23 (29) SR 0062, BRIDGE NO.4 OVER SAGE RUN, 24 CRANBERRY TOWNSHIP, BRIDGE REPLACEMENT 310,000 25 (30) SR 0322, BRIDGE OVER HALLS RUN, 26 CRANBERRY TOWNSHIP, BRIDGE REPLACEMENT 1,400,000 27 (31) SR 0062, SAGE RUN BRIDGE NO.1, 28 CRANBERRY TOWNSHIP, BRIDGE REPLACEMENT 400,000 29 (32) SR 0062, SAGE RUN BRIDGE NO.6, 30 CRANBERRY TOWNSHIP, BRIDGE REPLACEMENT 400,000 19990S0504B1019 - 528 -
1 (33) SR 0322, BRIDGE OVER FRENCH CREEK, 2 FRANKLIN CITY, BRIDGE REHABILITATION 9,900,000 3 (34) SR 0322, BRIDGE OVER ALLEGHENY RIVER, 4 FRANKLIN CITY, BRIDGE REHABILITATION 9,620,000 5 (35) SR 0062, BRIDGE OVER CONRAIL AND 6 FRENCH CREEK, FRANKLIN CITY, BRIDGE 7 PAINTING 920,000 8 (36) SR 0008, BRIDGE OVER T-371, IRWIN 9 TOWNSHIP, BRIDGE REPLACEMENT 1,250,000 10 (37) SR 4003, BRIDGE OVER WOLF RUN, 11 JACKSON TOWNSHIP, BRIDGE REPLACEMENT 200,000 12 (38) SR 3011, BRIDGE OVER SOUTH SANDY 13 CREEK, MINERAL TOWNSHIP, BRIDGE 14 REPLACEMENT 700,000 15 (39) SR 0428, BRIDGE OVER PRATHER RUN, 16 OAKLAND TOWNSHIP, BRIDGE REPLACEMENT 600,000 17 (40) SR 0428, BRIDGE OVER SUGAR CREEK, 18 OAKLAND TOWNSHIP, BRIDGE REPLACEMENT 600,000 19 (41) SR 6008, BRIDGE OVER OIL CREEK, OIL 20 CITY, BRIDGE REPLACEMENT 1,000,000 21 (42) SR 0427, BRIDGE NO.1 OVER SUGAR 22 CREEK, PLUM TOWNSHIP, BRIDGE 23 REPLACEMENT 300,000 24 (43) SR 0427, BRIDGE NO.2 OVER SUGAR 25 CREEK, PLUM TOWNSHIP, BRIDGE 26 REPLACEMENT 800,000 27 (44) SR 4022, BRIDGE OVER TRIBUTARY OF 28 SUGAR CREEK, PLUM TOWNSHIP, BRIDGE 29 REPLACEMENT 600,000 30 (45) SR 4022, BRIDGE OVER PORTER RUN, PLUM 19990S0504B1019 - 529 -
1 TOWNSHIP, BRIDGE REPLACEMENT 500,000
2 (46) SR 0080, I-80 BRIDGE OVER LITTLE
3 SCRUBGRASS CREEK, SCRUBGRASS TOWNSHIP,
4 BRIDGE REPLACEMENT 600,000
5 (47) SR 4006, BRIDGE OVER PATCHELL RUN,
6 SUGARCREEK BOROUGH, BRIDGE REPLACEMENT 300,000
7 (48) SR 4010, BRIDGE OVER SUGAR CREEK,
8 SUGARCREEK BOROUGH, BRIDGE REPLACEMENT 1,300,000
9 (49) SR 0062, BRIDGE OVER UPPER TWO MILE
10 RUN, SUGARCREEK BOROUGH, BRIDGE
11 REPLACEMENT 900,000
12 (50) SR 0322, BRIDGE OVER SUGAR CREEK,
13 SUGARCREEK BOROUGH, BRIDGE REPLACEMENT 6,520,000
14 (51) SR 0427, BRIDGE OVER SUGAR CREEK,
15 SUGARCREEK BOROUGH, BRIDGE REPLACEMENT 900,000
16 (52) SR 3023, BRIDGE OVER MILL CREEK,
17 UTICA BOROUGH, BRIDGE REPLACEMENT 400,000
18 (53) SR 0008, BRIDGE OVER T-380 AND SOUTH
19 BRANCH OF SANDY CREEK, VICTORY
20 TOWNSHIP, BRIDGE REPLACEMENT 4,530,000
21 (54) SR 0008, BRIDGE OVER T-380 AND NORTH
22 BRANCH OF SANDY CREEK, VICTORY
23 TOWNSHIP, BRIDGE REPLACEMENT 4,530,000
24 (55) SR 1006, 17TH STREET BRIDGE OVER
25 ALLENDER RUN, CORNPLANTER TOWNSHIP,
26 BRIDGE REPLACEMENT 300,000
27 Section 66. Warren County.
28 (a) Local Bridges (Reserved) <--
29 (A) LOCAL BRIDGES <--
30 (1) PINE GROVE TOWNSHIP, MAIN STREET
19990S0504B1019 - 530 -
1 BRIDGE OVER JOHNNY RUN, BRIDGE 2 REPLACEMENT 560,000 3 (BASE CONSTRUCTION ALLOCATION - 4 $500,000) 5 (LAND ALLOCATION - $10,000) 6 (DESIGN AND CONTINGENCIES - $50,000) 7 (b) State Bridges 8 (1) SR 0006, SR 0006 over Wintroth Run, 9 Brokenstraw Township, Bridge 10 Replacement 260,000 11 (Base Construction Allocation - 12 $180,000) 13 (Land Allocation - $20,000) 14 (Design and Contingencies - $60,000) 15 (2) SR 0006, SR 0006 over Six Mile Run, 16 Mead Township, Bridge Replacement 320,000 17 (Base Construction Allocation - 18 $250,000) 19 (Land Allocation - $10,000) 20 (Design and Contingencies - $60,000) 21 (3) SR 0027, SR 0027 over Pine Creek, 22 Southwest Township, Bridge Replacement 800,000 23 (Base Construction Allocation - 24 $580,000) 25 (Land Allocation - $20,000) 26 (Design and Contingencies - $200,000) 27 (4) SR 0027, SR 0027 over Hazeltine Hollow 28 Run, Brokenstraw Township, Bridge 29 Replacement 310,000 30 (Base Construction Allocation - 19990S0504B1019 - 531 -
1 $210,000) 2 (Land Allocation - $20,000) 3 (Design and Contingencies - $80,000) 4 (5) SR 0062, SR 0062 over Bully Run, 5 Watson Township, Bridge Replacement 300,000 6 (Base Construction Allocation - 7 $230,000) 8 (Land Allocation - $20,000) 9 (Design and Contingencies - $50,000) 10 (6) SR 0957, SR 0957 over Little 11 Brokenstraw Creek, Freehold Township, 12 Bridge Replacement 800,000 13 (Base Construction Allocation - 14 $620,000) 15 (Land Allocation - $20,000) 16 (Design and Contingencies - $160,000) 17 (7) SR 3009, SR 3009 over Tidioute Creek, 18 Deerfield Township, Bridge Replacement 470,000 19 (Base Construction Allocation - 20 $400,000) 21 (Land Allocation - $10,000) 22 (Design and Contingencies - $60,000) 23 (8) SR 4013, SR 4013 over Mathews Run, 24 Youngsville Borough, Bridge 25 Replacement 430,000 26 (Base Construction Allocation - 27 $360,000) 28 (Land Allocation - $10,000) 29 (Design and Contingencies - $60,000) 30 (9) SR 4021, SR 4021 over Brands Run, 19990S0504B1019 - 532 -
1 Sugar Grove Borough, Bridge 2 Replacement 240,000 3 (Base Construction Allocation - 4 $180,000) 5 (Land Allocation - $20,000) 6 (Design and Contingencies - $40,000) 7 (10) SR 0027, Bridge over Hazeltine Hollow 8 Run, Brokenstraw Township, Bridge 9 Replacement 500,000 10 (Base Construction Allocation - 11 $450,000) 12 (Design and Contingencies - $50,000) 13 (11) SR 0062, US 62, Bridge over Bully 14 Run, Watson Township, Bridge 15 Replacement 410,000 16 (Base Construction Allocation - 17 $370,000) 18 (Design and Contingencies - $40,000) 19 (12) SR 3009, Tidioute Creek Road Bridge 20 No.5 over Tidioute Creek, Triumph 21 Township, Bridge Replacement 290,000 22 (Base Construction Allocation - 23 $270,000) 24 (Design and Contingencies - $20,000) 25 (13) SR 0027, Pittsfield Truss Bridge over 26 Little Brokenstraw, Pittsfield 27 Township, Bridge Replacement 1,040,000 28 (Base Construction Allocation - 29 $900,000) 30 (Land Allocation - $40,000) 19990S0504B1019 - 533 -
1 (Design and Contingencies - $100,000) 2 (14) SR 3009, Tidioute Creek Road Bridge 3 No.5 over Tidioute Creek, Triumph 4 Township, Bridge Replacement 300,000 5 (Base Construction Allocation - 6 $270,000) 7 (Land Allocation - $10,000) 8 (Design and Contingencies - $20,000) 9 (15) SR 0006, BRIDGE OVER LUDLOW STREET, <-- 10 WARREN TOWNSHIP, BRIDGE REPLACEMENT 1,600,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $1,400,000) 13 (LAND ALLOCATION - $50,000) 14 (DESIGN AND CONTINGENCIES - $150,000) 15 (16) SR 0006, BRIDGE OVER DUTCHMANS RUN, 16 MEAD TOWNSHIP, BRIDGE REPLACEMENT 700,000 17 (BASE CONSTRUCTION ALLOCATION - 18 $600,000) 19 (LAND ALLOCATION - $20,000) 20 (DESIGN AND CONTINGENCIES - $80,000) 21 (17) SR 0006, BRIDGE OVER DUTCHMANS RUN, 22 MEAD TOWNSHIP, BRIDGE REPLACEMENT 800,000 23 (BASE CONSTRUCTION ALLOCATION - 24 $700,000) 25 (LAND ALLOCATION - $20,000) 26 (DESIGN AND CONTINGENCIES - $80,000) 27 (18) SR 0027, BRIDGE OVER CONRAIL, 28 PITTSFIELD TOWNSHIP, BRIDGE 29 REPLACEMENT 1,920,000 30 (BASE CONSTRUCTION ALLOCATION - 19990S0504B1019 - 534 -
1 $1,700,000) 2 (LAND ALLOCATION - $20,000) 3 (DESIGN AND CONTINGENCIES - $200,000) 4 (19) SR 0027, BRIDGE OVER TEELICK RUN, 5 BROKENSTRAW TOWNSHIP, BRIDGE 6 REPLACEMENT 200,000 7 (BASE CONSTRUCTION ALLOCATION - 8 $100,000) 9 (LAND ALLOCATION - $20,000) 10 (DESIGN AND CONTINGENCIES - $80,000) 11 (20) SR 0027, BRIDGE OVER MATHEWS RUN, 12 SUGAR GROVE TOWNSHIP, BRIDGE 13 REPLACEMENT 400,000 14 (BASE CONSTRUCTION ALLOCATION - 15 $300,000) 16 (LAND ALLOCATION - $20,000) 17 (DESIGN AND CONTINGENCIES - $80,000) 18 (21) SR 0059, BRIDGE OVER MORRISON RUN, 19 MEAD TOWNSHIP, BRIDGE REPLACEMENT 400,000 20 (BASE CONSTRUCTION ALLOCATION - 21 $300,000) 22 (LAND ALLOCATION - $20,000) 23 (DESIGN AND CONTINGENCIES - $80,000) 24 (22) SR 0059, BRIDGE OVER BROWN RUN, MEAD 25 TOWNSHIP, BRIDGE REPLACEMENT 400,000 26 (BASE CONSTRUCTION ALLOCATION - 27 $300,000) 28 (LAND ALLOCATION - $20,000) 29 (DESIGN AND CONTINGENCIES - $80,000) 30 (23) SR 0059, BRIDGE OVER WARD RUN, MEAD 19990S0504B1019 - 535 -
1 TOWNSHIP, BRIDGE REPLACEMENT 300,000 2 (BASE CONSTRUCTION ALLOCATION - 3 $200,000) 4 (LAND ALLOCATION - $20,000) 5 (DESIGN AND CONTINGENCIES - $80,000) 6 (24) SR 0059, BRIDGE OVER KINZUA CREEK, 7 MEAD TOWNSHIP, BRIDGE REPLACEMENT 22,720,000 8 (BASE CONSTRUCTION ALLOCATION - 9 $20,400,000) 10 (LAND ALLOCATION - $20,000) 11 (DESIGN AND CONTINGENCIES - $2,300,000) 12 (25) SR 0948, BRIDGE OVER TIONESTA CREEK, 13 SOUTH BRIDGE, SHEFFIELD TOWNSHIP, 14 BRIDGE REPLACEMENT 900,000 15 (BASE CONSTRUCTION ALLOCATION - 16 $800,000) 17 (LAND ALLOCATION - $20,000) 18 (DESIGN AND CONTINGENCIES - $80,000) 19 (26) SR 0957, BRIDGE OVER BROKENSTRAW 20 CREEK, COLUMBUS TOWNSHIP, BRIDGE 21 REPLACEMENT 1,120,000 22 (BASE CONSTRUCTION ALLOCATION - 23 $1,000,000) 24 (LAND ALLOCATION - $20,000) 25 (DESIGN AND CONTINGENCIES - $100,000) 26 (27) SR 0957, BRIDGE OVER KANETONE CREEK, 27 FARMINGTON TOWNSHIP, BRIDGE 28 REPLACEMENT 300,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $200,000) 19990S0504B1019 - 536 -
1 (LAND ALLOCATION - $20,000) 2 (DESIGN AND CONTINGENCIES - $80,000) 3 (28) SR 1011, CONEWANGO AVENUE BRIDGE, 4 GLADE TOWNSHIP, BRIDGE REHABILITATION 700,000 5 (BASE CONSTRUCTION ALLOCATION - 6 $600,000) 7 (LAND ALLOCATION - $20,000) 8 (DESIGN AND CONTINGENCIES - $80,000) 9 (29) SR 1030, BRIDGE OVER SCOTTS RUN, 10 CONEWANGO TOWNSHIP, BRIDGE REPLACEMENT 400,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $300,000) 13 (LAND ALLOCATION - $20,000) 14 (DESIGN AND CONTINGENCIES - $80,000) 15 (30) SR 2002, BRIDGE OVER TIONESTA CREEK, 16 SHEFFIELD TOWNSHIP, BRIDGE REPLACEMENT 900,000 17 (BASE CONSTRUCTION ALLOCATION - 18 $800,000) 19 (LAND ALLOCATION - $20,000) 20 (DESIGN AND CONTINGENCIES - $80,000) 21 (31) SR 2004, BRIDGE OVER TWO MILE RUN, 22 SHEFFIELD TOWNSHIP, BRIDGE REPLACEMENT 500,000 23 (BASE CONSTRUCTION ALLOCATION - 24 $400,000) 25 (LAND ALLOCATION - $20,000) 26 (DESIGN AND CONTINGENCIES - $80,000) 27 (32) SR 3004, BRIDGE OVER CALDWELL CREEK, 28 SOUTHWEST TOWNSHIP, BRIDGE REPLACEMENT 600,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $500,000) 19990S0504B1019 - 537 -
1 (LAND ALLOCATION - $20,000) 2 (DESIGN AND CONTINGENCIES - $80,000) 3 (33) SR 3016, BRIDGE OVER MEAD RUN, 4 BROKENSTRAW TOWNSHIP, BRIDGE 5 REPLACEMENT 500,000 6 (BASE CONSTRUCTION ALLOCATION - 7 $400,000) 8 (LAND ALLOCATION - $20,000) 9 (DESIGN AND CONTINGENCIES - $80,000) 10 (34) SR 4007, BRIDGE OVER COFFEE CREEK, 11 COLUMBUS TOWNSHIP, BRIDGE REPLACEMENT 300,000 12 (BASE CONSTRUCTION ALLOCATION - 13 $200,000) 14 (LAND ALLOCATION - $20,000) 15 (DESIGN AND CONTINGENCIES - $80,000) 16 (35) SR 4023, BRIDGE OVER BROKENSTRAW 17 CREEK, COLUMBUS TOWNSHIP, BRIDGE 18 REPLACEMENT 1,220,000 19 (BASE CONSTRUCTION ALLOCATION - 20 $1,100,000) 21 (LAND ALLOCATION - $20,000) 22 (DESIGN AND CONTINGENCIES - $100,000) 23 (36) SR 6006, CONEWANGO CREEK BRIDGE OVER 24 PENNSYLVANIA AVENUE, WARREN TOWNSHIP, 25 BRIDGE REPLACEMENT 3,820,000 26 (BASE CONSTRUCTION ALLOCATION - 27 $3,400,000) 28 (LAND ALLOCATION - $20,000) 29 (DESIGN AND CONTINGENCIES - $400,000) 30 (37) MAIN STREET BRIDGE OVER JOHNNY RUN, 19990S0504B1019 - 538 -
1 PINE GROVE TOWNSHIP, BRIDGE 2 REPLACEMENT 560,000 3 (BASE CONSTRUCTION ALLOCATION - 4 $500,000) 5 (LAND ALLOCATION - $10,000) 6 (DESIGN AND CONTINGENCIES - $50,000) 7 Section 67. Washington County. 8 (a) Local Bridges 9 (1) Burgettstown Borough, Raccoon Bridge 10 No.23 over Raccoon Creek, Bridge 11 Rehabilitation 433,000 12 (Base Construction Allocation - 13 $313,000) 14 (Land Allocation - $20,000) 15 (Design and Contingencies - $100,000) 16 (2) Chartiers Township, Allison Hollow 17 Road, One-Lane Bridge, Bridge 18 Replacement 195,000 19 (Base Construction Allocation - 20 $150,000) 21 (Land Allocation - $5,000) 22 (Design and Contingencies - $40,000) 23 (3) Chartiers Township, Allison Hollow 24 Road, One-Lane Bridge, Bridge 25 Replacement 195,000 26 (Base Construction Allocation - 27 $150,000) 28 (Land Allocation - $5,000) 29 (Design and Contingencies - $40,000) 30 (4) Chartiers Township, McGovern Road 19990S0504B1019 - 539 -
1 Bridge, Bridge Replacement 145,000 2 (Base Construction Allocation - 3 $100,000) 4 (Land Allocation - $5,000) 5 (Design and Contingencies - $40,000) 6 (5) North Strabane Township, T-643, Galley 7 Road Bridge over Little Chartiers 8 Creek, Bridge Replacement 570,000 9 (Base Construction Allocation - 10 $450,000) 11 (Land Allocation - $20,000) 12 (Design and Contingencies - $100,000) 13 (6) Donegal Township, T-541, Lindsay 14 Bridge over Buck Run, Bridge 15 Replacement 285,000 16 (Base Construction Allocation - 17 $255,000) 18 (Design and Contingencies - $30,000) 19 (7) Donegal Township, T-423, Mays Bridge 20 over Middle Wheeling Creek, Bridge 21 Replacement 245,000 22 (Base Construction Allocation - 23 $215,000) 24 (Design and Contingencies - $30,000) 25 (8) Independence Township, T-649, Cummins 26 Bridge over Sugar Camp Run, Bridge 27 Replacement 330,000 28 (Base Construction Allocation - 29 $300,000) 30 (Design and Contingencies - $30,000) 19990S0504B1019 - 540 -
1 (9) Mount Pleasant Township, T-749, Sabo 2 Road over Westland Run, Bridge 3 Replacement 25,000 4 (Base Construction Allocation - 5 $20,000) 6 (Design and Contingencies - $5,000) 7 (10) Mount Pleasant Township, T-606, 8 Primrose Road over Millers Run, Bridge 9 Replacement 25,000 10 (Base Construction Allocation - 11 $20,000) 12 (Design and Contingencies - $5,000) 13 (11) Mount Pleasant Township, T-493, 14 Meriage Street over Robinson Run 15 Tributary, Bridge Replacement 25,000 16 (Base Construction Allocation - 17 $20,000) 18 (Design and Contingencies - $5,000) 19 (12) North Bethlehem Township, T-445, 20 Dague Bridge over Pigeon Creek, Bridge 21 Replacement 250,000 22 (Base Construction Allocation - 23 $220,000) 24 (Design and Contingencies - $30,000) 25 (13) North Franklin Township, T-526, Cario 26 Drive over Unnamed Tributary of Catfish 27 Creek, Bridge Replacement 46,000 28 (Base Construction Allocation - 29 $42,000) 30 (Design and Contingencies - $4,000) 19990S0504B1019 - 541 -
1 (14) Nottingham Township, T-782, Sundust 2 Road Culvert, 35 Feet North of 3 Intersection with SR 1059, Bridge 4 Replacement 101,000 5 (Base Construction Allocation - 6 $91,000) 7 (Design and Contingencies - $10,000) 8 (15) Nottingham Township, T-828, Barr 9 Bridge over Mingo Creek, Bridge 10 Replacement 350,000 11 (Base Construction Allocation - 12 $310,000) 13 (Design and Contingencies - $40,000) 14 (16) Robinson Township, T-500, Chamberlain 15 Bridge over Chamberlain Run, Bridge 16 Replacement 285,000 17 (Base Construction Allocation - 18 $255,000) 19 (Design and Contingencies - $30,000) 20 (17) Smith Township, T-843, Dunbar Bridge 21 over Raccoon Creek, Bridge Replacement 285,000 22 (Base Construction Allocation - 23 $255,000) 24 (Design and Contingencies - $30,000) 25 (18) City of Washington, Hanna Street 26 Bridge over Catfish Creek, Bridge 27 Replacement 40,000 28 (Base Construction Allocation - 29 $30,000) 30 (Design and Contingencies - $10,000) 19990S0504B1019 - 542 -
1 (19) City of Washington, Rosewood Avenue 2 Bridge over Catfish Creek, Bridge 3 Replacement 40,000 4 (Base Construction Allocation - 5 $30,000) 6 (Design and Contingencies - $10,000) 7 (20) West Pike Run Township, T-840, Suzy 8 Lane over Pike Run Creek, Bridge 9 Replacement 230,000 10 (Base Construction Allocation - 11 $210,000) 12 (Design and Contingencies - $20,000) 13 (21) California Borough, Daisytown Bridge 14 over Pike Run, Bridge Replacement 925,000 15 (Base Construction Allocation - 16 $700,000) 17 (Land Allocation - $50,000) 18 (Design and Contingencies - $175,000) 19 (22) Coal Center Borough, Water Street 20 Bridge over Pike Run, Bridge 21 Replacement 1,588,000 22 (Base Construction Allocation - 23 $1,288,000) 24 (Land Allocation - $50,000) 25 (Design and Contingencies - $250,000) 26 (23) West Pike Run Township, T-948 over 27 Pike Run, Bridge Replacement 1,075,000 28 (Base Construction Allocation - 29 $850,000) 30 (Land Allocation - $50,0000) 19990S0504B1019 - 543 -
1 (Design and Contingencies - $175,000) 2 (24) Midway Borough, North Avenue over 3 Robinson Run Creek, Bridge Replacement 95,000 4 (Base Construction Allocation - 5 $55,000) 6 (Land Allocation - $20,000) 7 (Design and Contingencies - $20,000) 8 (25) Canonsburg Borough, Adams Street over 9 Brush Run, Bridge Replacement 176,000 10 (Base Construction Allocation - 11 $150,000) 12 (Land Allocation - $1,000) 13 (Design and Contingencies - $25,000) 14 (26) East Finley Township, T-375, County 15 Bridge No. 32 over Templeton Fork, 16 Bridge Replacement 355,000 17 (Base Construction Allocation - 18 $300,000) 19 (Land Allocation - $5,000) 20 (Design and Contingencies - $50,000) 21 (27) North Franklin Township, Construct 22 New Bridges Along New Local Road 23 Connecting SR 3013 and SR 0018, New 24 Bridge Construction 1,168,000 25 (Base Construction Allocation - 26 $928,000) 27 (Land Allocation - $100,000) 28 (Design and Contingencies - $140,000) 29 (28) PETERS TOWNSHIP, BEBOUT ROAD BRIDGE, <-- 30 BRIDGE REHABILITATION 365,000 19990S0504B1019 - 544 -
1 (BASE CONSTRUCTION ALLOCATION - 2 $365,000) 3 (29) BLAINE TOWNSHIP, BRIDGE NO.23 OVER 4 BUFFALO CREEK, BRIDGE REPLACEMENT 315,000 5 (BASE CONSTRUCTION ALLOCATION - 6 $210,000) 7 (LAND ALLOCATION - $5,000) 8 (DESIGN AND CONTINGENCIES - $100,000) 9 (30) BUFFALO TOWNSHIP, BRIDGE NO.38 OVER 10 BUFFALO CREEK, BRIDGE REPLACEMENT 315,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $210,000) 13 (LAND ALLOCATION - $5,000) 14 (DESIGN AND CONTINGENCIES - $100,000) 15 (31) DONEGAL TOWNSHIP, BRIDGE NO.4 OVER 16 MIDDLE WHEELING CREEK, BRIDGE 17 REPLACEMENT 315,000 18 (BASE CONSTRUCTION ALLOCATION - 19 $210,000) 20 (LAND ALLOCATION - $5,000) 21 (DESIGN AND CONTINGENCIES - $100,000) 22 (32) MARIANNA BOROUGH, BRIDGE NO.3 OVER 23 PATTERSON RUN, BRIDGE REPLACEMENT 710,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $500,000) 26 (LAND ALLOCATION - $10,000) 27 (DESIGN AND CONTINGENCIES - $200,000) 28 (33) NOTTINGHAM TOWNSHIP, BRIDGE NO.11 29 OVER MINGO CREEK, BRIDGE REPLACEMENT 325,000 30 (BASE CONSTRUCTION ALLOCATION - 19990S0504B1019 - 545 -
1 $220,000) 2 (LAND ALLOCATION - $5,000) 3 (DESIGN AND CONTINGENCIES - $100,000) 4 (34) WEST BETHLEHEM TOWNSHIP, GRABLE ROAD 5 CULVERT, BRIDGE REPLACEMENT 400,000 6 (BASE CONSTRUCTION ALLOCATION - 7 $285,000) 8 (LAND ALLOCATION - $15,000) 9 (DESIGN AND CONTINGENCIES - $100,000) 10 (35) WEST BETHLEHEM TOWNSHIP, DUTCH GLORY 11 ROAD BRIDGE, BRIDGE REPLACEMENT 350,000 12 (BASE CONSTRUCTION ALLOCATION - 13 $245,000) 14 (LAND ALLOCATION - $5,000) 15 (DESIGN AND CONTINGENCIES - $100,000) 16 (36) WEST PIKE RUN TOWNSHIP, BRIDGE NO.18 17 OVER PIKE RUN, BRIDGE REPLACEMENT 305,000 18 (BASE CONSTRUCTION ALLOCATION - 19 $200,000) 20 (LAND ALLOCATION - $5,000) 21 (DESIGN AND CONTINGENCIES - $100,000) 22 (b) State Bridges 23 (1) SR 0018, Bridge over Abandoned 24 Railroad, City of Washington, Bridge 25 Replacement 650,000 26 (Base Construction Allocation - 27 $500,000) 28 (Land Allocation - $25,000) 29 (Design and Contingencies - $125,000) 30 (2) SR 0019, Bridge over Chartiers Creek, 19990S0504B1019 - 546 -
1 North Strabane and Peters Townships, 2 Bridge Painting 161,000 3 (Base Construction Allocation - 4 $156,000) 5 (Design and Contingencies - $5,000) 6 (3) SR 0070, I-70 Westbound Bridge over SR 7 3009, Buffalo Township, Bridge 8 Painting 148,000 9 (Base Construction Allocation - 10 $143,000) 11 (Design and Contingencies - $5,000) 12 (4) SR 0070, I-70 Eastbound Bridge over SR 13 3009, Buffalo Township, Bridge 14 Painting 163,000 15 (Base Construction Allocation - 16 $158,000) 17 (Design and Contingencies - $5,000) 18 (5) SR 0070, I-70 Bridge over 8th Street, 19 Donegal Township, Bridge Replacement 2,486,000 20 (Base Construction Allocation - 21 $2,211,000) 22 (Land Allocation - $25,000) 23 (Design and Contingencies - $250,000) 24 (6) SR 0070, I-70 Bridge over Turnback 25 Road, South Strabane Township, Bridge 26 Rehabilitation 990,000 27 (Base Construction Allocation - 28 $750,000) 29 (Land Allocation - $40,000) 30 (Design and Contingencies - $200,000) 19990S0504B1019 - 547 -
1 (7) SR 0070, I-70 Bridge over SR 0519, 2 Somerset Township, Bridge 3 Rehabilitation 2,000,000 4 (Base Construction Allocation - 5 $1,720,000) 6 (Land Allocation - $40,000) 7 (Design and Contingencies - $240,000) 8 (8) SR 0070, I-70 Bridge over SR 2017, 9 Somerset Township, Bridge 10 Rehabilitation 1,105,000 11 (Base Construction Allocation - 12 $865,000) 13 (Land Allocation - $40,000) 14 (Design and Contingencies - $200,000) 15 (9) SR 0088, Charleroi Bridge over Maple 16 Creek, Charleroi and Speers Boroughs, 17 Bridge Replacement 725,000 18 (Base Construction Allocation - 19 $500,000) 20 (Land Allocation - $25,000) 21 (Design and Contingencies - $200,000) 22 (10) SR 0088, Bridge over Peters Creek, 23 Finleyville Borough, Bridge Painting 65,000 24 (Base Construction Allocation - 25 $65,000) 26 (11) SR 0917, Pigeon Creek Bridge over 27 Branch of Pigeon Creek, Bentleyville 28 Borough, Bridge Replacement 570,000 29 (Base Construction Allocation - 30 $370,000) 19990S0504B1019 - 548 -
1 (Land Allocation - $25,000) 2 (Design and Contingencies - $175,000) 3 (12) SR 1005, Bridge over Millers Run, 4 Cecil Township, Bridge Painting 75,000 5 (Base Construction Allocation - 6 $75,000) 7 (13) SR 1022, Donora Webster Bridge over 8 Monongahela River and Conrail, Donora 9 Borough, Bridge Replacement 20,000,000 10 (Base Construction Allocation - 11 $15,000,000) 12 (Land Allocation - $3,000,000) 13 (Design and Contingencies - $2,000,000) 14 (14) SR 1077, Donora-Monessen Bridge over 15 Monongahela River, PA 837 and 906 and 16 Railroad, Donora Borough, Bridge 17 Painting 1,000,000 18 (Base Construction Allocation - 19 $1,000,000) 20 (15) SR 2005, Sowers Run Bridge over 21 Sowers Run, Amwell Township, Bridge 22 Replacement 435,000 23 (Base Construction Allocation - 24 $235,000) 25 (Land Allocation - $25,000) 26 (Design and Contingencies - $175,000) 27 (16) SR 2011, Bridge over Branch of Little 28 Tenmile Creek, West Bethlehem Township, 29 Bridge Replacement 460,000 30 (Base Construction Allocation - 19990S0504B1019 - 549 -
1 $260,000) 2 (Land Allocation - $25,000) 3 (Design and Contingencies - $175,000) 4 (17) SR 2030, Gorby's Bridge II over Gorby 5 Run, California Borough, Bridge 6 Rehabilitation 300,000 7 (Base Construction Allocation - 8 $300,000) 9 (18) SR 2037, Maple Creek Bridge over 10 Branch of Maple Creek, Fallowfield 11 Township, Bridge Replacement 486,000 12 (Base Construction Allocation - 13 $286,000) 14 (Land Allocation - $25,000) 15 (Design and Contingencies - $175,000) 16 (19) SR 3009, Buffalo Arch Bridge over 17 Branch of Buffalo Creek and Railroad, 18 Buffalo Township, Bridge Replacement 535,000 19 (Base Construction Allocation - 20 $300,000) 21 (Land Allocation - $10,000) 22 (Design and Contingencies - $225,000) 23 (20) SR 4015, Bridge over Cherry Run, 24 Mount Pleasant Township, Bridge 25 Painting 53,000 26 (Base Construction Allocation - 27 $51,000) 28 (Design and Contingencies - $2,000) 29 (21) SR 4022, Chartiers Creek Bridge No.2 30 over Branch of Chartiers Creek, Canton 19990S0504B1019 - 550 -
1 Township, Bridge Replacement 415,000 2 (Base Construction Allocation - 3 $215,000) 4 (Land Allocation - $25,000) 5 (Design and Contingencies - $175,000) 6 (22) SR 4022, Chartiers Creek Bridge No.1 7 over Branch of Chartiers Creek, Canton 8 Township, Bridge Replacement 405,000 9 (Base Construction Allocation - 10 $205,000) 11 (Land Allocation - $25,000) 12 (Design and Contingencies - $175,000) 13 (23) SR 2034, SR 2034 over Branch of Pike 14 Run, West Pike Run Township, Bridge 15 Replacement 438,000 16 (Base Construction Allocation - 17 $313,000) 18 (Land Allocation - $25,000) 19 (Design and Contingencies - $100,000) 20 (24) SR 2079, SR 2079 over Pike Run, West 21 Pike Run Township, Bridge Replacement 988,000 22 (Base Construction Allocation - 23 $788,000) 24 (Land Allocation - $50,000) 25 (Design and Contingencies - $150,000) 26 (25) SR 2030, Bridge No.1 over Gorby Run, 27 California Borough, Bridge Replacement 430,000 28 (Base Construction Allocation - 29 $330,000) 30 (Design and Contingencies - $100,000) 19990S0504B1019 - 551 -
1 (26) SR 1077, Donora-Monessen Bridge over 2 Monongahela River, Donora Borough, 3 Bridge Rehabilitation 2,000,000 4 (Base Construction Allocation - 5 $1,980,000) 6 (Design and Contingencies - $20,000) 7 (27) SR 0070, I-70 BRIDGE AT SR 0481 <-- 8 INTERCHANGE, MON CITY EXIT, FALLOWFIELD 9 TOWNSHIP, BRIDGE REPLACEMENT 580,000 10 (BASE CONSTRUCTION ALLOCATION - 11 $280,000) 12 (LAND ALLOCATION - $100,000) 13 (DESIGN AND CONTINGENCIES - $200,000) 14 Section 68. Wayne County. 15 (a) Local Bridges 16 (1) Honesdale Borough, Old Willow Avenue, 17 Bridge over Corley Brook at 18 Intersection of TR 6, Bridge 19 Replacement 410,000 20 (Base Construction Allocation - 21 $350,000) 22 (Land Allocation - $10,000) 23 (Design and Contingencies - $50,000) 24 (b) State Bridges 25 (1) SR 0371, Cochecton Bridge No.6 over 26 Delaware River, Damascus Township, 27 Bridge Rehabilitation 1,050,000 28 (Base Construction Allocation - 29 $950,000) 30 (Design and Contingencies - $100,000) 19990S0504B1019 - 552 -
1 (2) SR 0380, I-380 Bridge over Lehigh 2 River, Lehigh Township, Bridge 3 Rehabilitation 284,000 4 (Base Construction Allocation - 5 $244,000) 6 (Design and Contingencies - $40,000) 7 (3) SR 4009, Quarry Bridge over Dyberry 8 Creek, Dyberry Township, Bridge 9 Replacement 660,000 10 (Base Construction Allocation - 11 $500,000) 12 (Land Allocation - $10,000) 13 (Design and Contingencies - $150,000) 14 (4) SR 0371, Bridge No.6, Damascus 15 Township, Bridge Painting 2,200,000 16 (Base Construction Allocation - 17 $2,000,000) 18 (Design and Contingencies - $200,000) 19 (5) SR 1020, Bridge No.7 over Delaware 20 River, Damascus Township, Bridge 21 Painting 3,300,000 22 (Base Construction Allocation - 23 $3,000,000) 24 (Design and Contingencies - $300,000) 25 (6) SR 1004, Bridge over Outlet of Beach 26 Lake, Intersection of SR 1011, Berlin 27 Township, Bridge Replacement 345,000 28 (Base Construction Allocation - 29 $265,000) 30 (Land Allocation - $10,000) 19990S0504B1019 - 553 -
1 (Design and Contingencies - $70,000) 2 (7) SR 3028, Bridge over TR 191, East of 3 SR 3031, Cherry Ridge Township, Bridge 4 Replacement 450,000 5 (Base Construction Allocation - 6 $350,000) 7 (Land Allocation - $10,000) 8 (Design and Contingencies - $90,000) 9 (8) State Bridges, Countywide Bridge Zone 10 Painting, Bridge Painting 370,000 11 (Base Construction Allocation - 12 $350,000) 13 (Land Allocation - $10,000) 14 (Design and Contingencies - $10,000) 15 (9) SR 1004, SR 1004 over Outlet of Beach 16 Lake, Berlin Township, Bridge 17 Replacement 260,000 18 (Base Construction Allocation - 19 $220,000) 20 (Land Allocation - $10,000) 21 (Design and Contingencies - $30,000) 22 (10) SR 3028, SR 3028 over TR 191, Cherry 23 Ridge Township, Bridge Replacement 400,000 24 (Base Construction Allocation - 25 $340,000) 26 (Land Allocation - $10,000) 27 (Design and Contingencies - $50,000) 28 (11) SR 0371, Bridge No.1 over Dyberry 29 Creek at Junction of SR 1023, Lebanon 30 Township, Bridge Replacement 400,000 19990S0504B1019 - 554 -
1 (Base Construction Allocation - 2 $340,000) 3 (Land Allocation - $10,000) 4 (Design and Contingencies - $50,000) 5 (12) SR 0371, Bridge No.5 over Beaver Dam 6 Creek, 0.1 Mile West of SR 1031, 7 Damascus Township, Bridge Replacement 470,000 8 (Base Construction Allocation - 9 $400,000) 10 (Land Allocation - $10,000) 11 (Design and Contingencies - $60,000) 12 (13) SR 3006, Bridge No.3 over Ariel 13 Creek, 0.6 Mile North of SR 3008, Salem 14 Township, Bridge Replacement 470,000 15 (Base Construction Allocation - 16 $400,000) 17 (Land Allocation - $10,000) 18 (Design and Contingencies - $60,000) 19 (14) SR 4014, Bridge No.4 over Balls 20 Creek, 0.5 Mile East of SR 4037, Scott 21 Township, Bridge Replacement 380,000 22 (Base Construction Allocation - 23 $320,000) 24 (Land Allocation - $10,000) 25 (Design and Contingencies - $50,000) 26 (15) SR 0348, Bridge over Jones Creek, 0.1 27 Mile West of SR 3019, Salem Township, 28 Bridge Replacement 470,000 29 (Base Construction Allocation - 30 $400,000) 19990S0504B1019 - 555 -
1 (Land Allocation - $10,000) 2 (Design and Contingencies - $60,000) 3 (16) SR 4043, Bridge over Branch of Oquaga 4 Creek, 1.5 Miles West of SR 4037, Scott 5 Township, Bridge Replacement 240,000 6 (Base Construction Allocation - 7 $200,000) 8 (Land Allocation - $10,000) 9 (Design and Contingencies - $30,000) 10 (17) SR 1007, Bridge over Branch of Boyd's 11 Creek, 0.5 Mile East of SR 1019, 12 Damascus Township, Bridge Replacement 310,000 13 (Base Construction Allocation - 14 $260,000) 15 (Land Allocation - $10,000) 16 (Design and Contingencies - $40,000) 17 (18) SR 0006, Lackawaxen River Bridge over 18 Lackawaxen River, Honesdale Borough, 19 Bridge Rehabilitation 260,000 20 (Base Construction Allocation - 21 $180,000) 22 (Design and Contingencies - $80,000) 23 Section 69. Westmoreland County. 24 (a) Local Bridges 25 (1) Hempfield Township, Airport Hill Road 26 Bridge over Slate Creek, Bridge 27 Replacement 350,000 28 (Base Construction Allocation - 29 $280,000) 30 (Land Allocation - $10,000) 19990S0504B1019 - 556 -
1 (Design and Contingencies - $60,000) 2 (2) Hempfield Township, Sweitzer Road 3 Bridge over Sewickley Creek, Bridge 4 Replacement 975,000 5 (Base Construction Allocation - 6 $800,000) 7 (Land Allocation - $15,000) 8 (Design and Contingencies - $160,000) 9 (3) Hempfield Township, Ladysmith Road 10 Bridge over Little Sewickley Creek, 11 Bridge Replacement 813,000 12 (Base Construction Allocation - 13 $613,000) 14 (Land Allocation - $50,000) 15 (Design and Contingencies - $150,000) 16 (4) Hempfield Township, Old Route 30 17 Bridge over Slate Creek, Bridge 18 Replacement 370,000 19 (Base Construction Allocation - 20 $300,000) 21 (Land Allocation - $10,000) 22 (Design and Contingencies - $60,000) 23 (5) Hempfield Township, Old Route 119 24 Bridge over Tributary of Jacks Run, 25 Bridge Replacement 428,000 26 (Base Construction Allocation - 27 $288,000) 28 (Land Allocation - $15,000) 29 (Design and Contingencies - $125,000) 30 (6) Jeanette City, 6th Street Bridge over 19990S0504B1019 - 557 -
1 Brush Creek, Bridge Replacement 460,000 2 (Base Construction Allocation - 3 $340,000) 4 (Land Allocation - $20,000) 5 (Design and Contingencies - $100,000) 6 (7) Ligonier Township, T-605, Bridge over 7 Two Mile Run, Bridge Replacement 320,000 8 (Base Construction Allocation - 9 $200,000) 10 (Land Allocation - $20,000) 11 (Design and Contingencies - $100,000) 12 (8) Ligonier Township, T-617, Bridge over 13 Mill Run, Bridge Replacement 310,000 14 (Base Construction Allocation - 15 $190,000) 16 (Land Allocation - $20,000) 17 (Design and Contingencies - $100,000) 18 (9) Hempfield Township, Possum Hollow Road 19 Bridge over Tributary of Little 20 Sewickley Creek, Bridge Replacement 428,000 21 (Base Construction Allocation - 22 $288,000) 23 (Land Allocation - $15,000) 24 (Design and Contingencies - $125,000) 25 (10) South Huntington Township, T-390, 26 Williams Road Bridge, Bridge 27 Replacement 125,000 28 (Base Construction Allocation - 29 $100,000) 30 (Land Allocation - $5,000) 19990S0504B1019 - 558 -
1 (Design and Contingencies - $20,000) 2 (11) South Huntington Township, T-562, 3 J.D. Smith Road Bridge, Bridge 4 Replacement 155,000 5 (Base Construction Allocation - 6 $125,000) 7 (Land Allocation - $5,000) 8 (Design and Contingencies - $25,000) 9 (12) South Huntington Township, T-386, 10 Bridge No. 1, Mount Etna Road Bridge, 11 Bridge Replacement 145,000 12 (Base Construction Allocation - 13 $115,000) 14 (Land Allocation - $5,000) 15 (Design and Contingencies - $25,000) 16 (13) South Huntington Township, T-386, 17 Bridge No.2, Mount Etna Road at Remo 18 Road, Bridge Replacement 135,000 19 (Base Construction Allocation - 20 $110,000) 21 (Land Allocation - $5,000) 22 (Design and Contingencies - $20,000) 23 (14) South Huntington Township, T-385, 24 Commer Road Bridge, Bridge Replacement 150,000 25 (Base Construction Allocation - 26 $120,000) 27 (Land Allocation - $5,000) 28 (Design and Contingencies - $25,000) 29 (15) Washington Township, T-979, Pleasant 30 View Road Bridge over Beaver Run, 19990S0504B1019 - 559 -
1 Bridge Replacement 385,000 2 (Base Construction Allocation - 3 $265,000) 4 (Land Allocation - $20,000) 5 (Design and Contingencies - $100,000) 6 (16) Derry Township, T-924, Bridge over 7 Union Run, Bridge Replacement 578,000 8 (Base Construction Allocation - 9 $463,000) 10 (Land Allocation - $15,000) 11 (Design and Contingencies - $100,000) 12 (17) Derry Township, T-937, Bridge over 13 Stony Run, Bridge Replacement 553,000 14 (Base Construction Allocation - 15 $438,000) 16 (Land Allocation - $15,000) 17 (Design and Contingencies - $100,000) 18 (18) Derry Township, T-941, Bridge over 19 Stony Run, Bridge Replacement 590,000 20 (Base Construction Allocation - 21 $475,000) 22 (Land Allocation - $15,000) 23 (Design and Contingencies - $100,000) 24 (19) Donegal Township, T-916, Bridge over 25 Indian Creek, Bridge Replacement 465,000 26 (Base Construction Allocation - 27 $350,000) 28 (Land Allocation - $15,000) 29 (Design and Contingencies - $100,000) 30 (20) Donegal Township, T-880, Bridge over 19990S0504B1019 - 560 -
1 Four Mile Run, Bridge No.3, Bridge 2 Replacement 415,000 3 (Base Construction Allocation - 4 $300,000) 5 (Land Allocation - $15,000) 6 (Design and Contingencies - $100,000) 7 (21) Donegal Township, T-880, Bridge over 8 Four Mile Run, Bridge No.5, Bridge 9 Replacement 415,000 10 (Base Construction Allocation - 11 $300,000) 12 (Land Allocation - $15,000) 13 (Design and Contingencies - $100,000) 14 (22) Fairfield Township, T-739, Berkey's 15 Bridge over Unnamed Tributary, Bridge 16 Replacement 200,000 17 (Base Construction Allocation - 18 $170,000) 19 (Land Allocation - $10,000) 20 (Design and Contingencies - $20,000) 21 (23) Fairfield Township, T-847, Bailey's 22 Bridge over Hendricks Run, Bridge 23 Replacement 200,000 24 (Base Construction Allocation - 25 $170,000) 26 (Land Allocation - $10,000) 27 (Design and Contingencies - $20,000) 28 (24) Fairfield Township, T-847, Toby 29 Bridge over Unnamed Tributary, Bridge 30 Replacement 200,000 19990S0504B1019 - 561 -
1 (Base Construction Allocation - 2 $170,000) 3 (Land Allocation - $10,000) 4 (Design and Contingencies - $20,000) 5 (25) Fairfield Township, T-931, Patterson 6 Bridge No.1 over Bear Pond Run, Bridge 7 Replacement 200,000 8 (Base Construction Allocation - 9 $170,000) 10 (Land Allocation - $10,000) 11 (Design and Contingencies - $20,000) 12 (26) Fairfield Township, T-984, Love 13 Hollow Bridge No.1 over Hendricks Run, 14 Bridge Replacement 200,000 15 (Base Construction Allocation - 16 $170,000) 17 (Land Allocation - $10,000) 18 (Design and Contingencies - $20,000) 19 (27) Fairfield Township, T-984, Love 20 Hollow Bridge No.2 over Hendricks Run, 21 Bridge Replacement 200,000 22 (Base Construction Allocation - 23 $170,000) 24 (Land Allocation - $10,000) 25 (Design and Contingencies - $20,000) 26 (28) Fairfield Township, T-988, Yeager 27 Hollow Bridge No.1 over Unnamed 28 Tributary, Bridge Replacement 200,000 29 (Base Construction Allocation - 30 $170,000) 19990S0504B1019 - 562 -
1 (Land Allocation - $10,000) 2 (Design and Contingencies - $20,000) 3 (29) Fairfield Township, T-988, Yeager 4 Hollow Bridge No.2 over Unnamed 5 Tributary, Bridge Replacement 200,000 6 (Base Construction Allocation - 7 $170,000) 8 (Land Allocation - $10,000) 9 (Design and Contingencies - $20,000) 10 (30) Fairfield Township, T-990, Patterson 11 Bridge No.2 over Unnamed Tributary, 12 Bridge Replacement 200,000 13 (Base Construction Allocation - 14 $170,000) 15 (Land Allocation - $10,000) 16 (Design and Contingencies - $20,000) 17 (31) Ligonier Township, T-505, Horner Hill 18 Road over Laughlintown Run, Bridge 19 Replacement 175,000 20 (Base Construction Allocation - 21 $125,000) 22 (Land Allocation - $15,000) 23 (Design and Contingencies - $35,000) 24 (32) Ligonier Township, T-607, Weller Road 25 over Unnamed Stream, Bridge 26 Replacement 10,000 27 (Base Construction Allocation - $8,000) 28 (Design and Contingencies - $2,000) 29 (33) Ligonier Township, T-617, Robb Road 30 over Hannas Run, Bridge Replacement 310,000 19990S0504B1019 - 563 -
1 (Base Construction Allocation - 2 $250,000) 3 (Land Allocation - $10,000) 4 (Design and Contingencies - $50,000) 5 (34) Ligonier Township, T-719, Peoples 6 Road over Unnamed Stream, Bridge 7 Replacement 100,000 8 (Base Construction Allocation - 9 $75,000) 10 (Land Allocation - $5,000) 11 (Design and Contingencies - $20,000) 12 (35) Ligonier Township, T-721, Bridge over 13 North Fork of Trout Run, Bridge 14 Replacement 200,000 15 (Base Construction Allocation - 16 $125,000) 17 (Land Allocation - $10,000) 18 (Design and Contingencies - $65,000) 19 (36) Ligonier Township, T-942, Zion Church 20 Road over Unnamed Stream, Bridge 21 Replacement 50,000 22 (Base Construction Allocation - 23 $35,000) 24 (Land Allocation - $5,000) 25 (Design and Contingencies - $10,000) 26 (37) Ligonier Township, T-984, Mill Road 27 over Mill Race, Bridge Replacement 50,000 28 (Base Construction Allocation - 29 $35,000) 30 (Land Allocation - $5,000) 19990S0504B1019 - 564 -
1 (Design and Contingencies - $10,000) 2 (38) Ligonier Township, T-950, Old Lincoln 3 Highway East over Unnamed Stream, 4 Bridge Rehabilitation 25,000 5 (Base Construction Allocation - 6 $20,000) 7 (Design and Contingencies - $5,000) 8 (39) Ligonier Township, T-984, Harvey Road 9 over Macks Run, Bridge Rehabilitation 5,000 10 (Base Construction Allocation - $4,000) 11 (Design and Contingencies - $1,000) 12 (40) Saint Clair Township, T-994, Bridge 13 over Tubmill Creek, Bridge Replacement 440,000 14 (Base Construction Allocation - 15 $325,000) 16 (Land Allocation - $15,000) 17 (Design and Contingencies - $100,000) 18 (41) Sewickley Township, T-318, Bridge 19 No.3 over Tributary of Youghiogheny 20 River, Bridge Replacement 100,000 21 (Base Construction Allocation - 22 $70,000) 23 (Land Allocation - $5,000) 24 (Design and Contingencies - $25,000) 25 (42) Derry Township, Conrail Overpass over 26 SR 0981, Bridge Replacement 1,600,000 27 (Base Construction Allocation - 28 $1,200,000) 29 (Land Allocation - $200,000) 30 (Design and Contingencies - $200,000) 19990S0504B1019 - 565 -
1 (43) Hempfield Township, T-399 over Jacks 2 Run, Bridge Replacement 428,000 3 (Base Construction Allocation - 4 $288,000) 5 (Land Allocation - $15,000) 6 (Design and Contingencies - $125,000) 7 (44) Hempfield Township, T-550 over 8 Tributary to Little Sewickley Creek, 9 Bridge Replacement 428,000 10 (Base Construction Allocation - 11 $288,000) 12 (Land Allocation - $15,000) 13 (Design and Contingencies - $125,000) 14 (45) Ligonier Township, T-984 over Mill 15 Creek, Bridge Replacement 650,000 16 (Base Construction Allocation - 17 $450,000) 18 (Land Allocation - $50,000) 19 (Design and Contingencies - $150,000) 20 (46) Salem Township, T-881, Bridge over 21 Loyalhanna Creek, Bridge Replacement 82,000 22 (Base Construction Allocation - 23 $67,000) 24 (Design and Contingencies - $15,000) 25 (47) Sewickley Township, T-633, Green 26 Hills Road Bridge over Little Sewickley 27 Creek, Bridge Replacement 465,000 28 (Base Construction Allocation - 29 $325,000) 30 (Land Allocation - $15,000) 19990S0504B1019 - 566 -
1 (Design and Contingencies - $125,000) 2 (b) State Bridges 3 (1) SR 0030, Mill Creek Bridge over Mill 4 Creek, Ligonier Township, Bridge 5 Replacement 910,000 6 (Base Construction Allocation - 7 $710,000) 8 (Land Allocation - $25,000) 9 (Design and Contingencies - $175,000) 10 (2) SR 0031, Jacobs Creek Bridge over 11 Jacobs Creek, Mount Pleasant and 12 Bullskin Townships, Bridge Replacement 715,000 13 (Base Construction Allocation - 14 $500,000) 15 (Land Allocation - $40,000) 16 (Design and Contingencies - $175,000) 17 (3) SR0056, Seward Bridge over Conrail and 18 Local Road, St. Clair Township, Bridge 19 Painting 600,000 20 (Base Construction Allocation - 21 $600,000) 22 (4) SR 0070, I-70 Bridge over N&W 23 Railroad, Rostraver Township, Bridge 24 Rehabilitation 1,565,000 25 (Base Construction Allocation - 26 $1,305,000) 27 (Land Allocation - $60,000) 28 (Design and Contingencies - $200,000) 29 (5) SR 0070, I-70 Bridge over Conrail, 30 South Huntington Township, Bridge 19990S0504B1019 - 567 -
1 Rehabilitation 3,125,000 2 (Base Construction Allocation - 3 $2,780,000) 4 (Land Allocation - $45,000) 5 (Design and Contingencies - $300,000) 6 (6) SR 0119, Crabtree Creek Bridge No.2 7 over Crabtree Creek, Hempfield 8 Township, Bridge Replacement 577,000 9 (Base Construction Allocation - 10 $377,000) 11 (Land Allocation - $25,000) 12 (Design and Contingencies - $175,000) 13 (7) SR 0136, West Newton Bridge over 14 Youghiogheny River, West Newton 15 Borough, Bridge Painting 250,000 16 (Base Construction Allocation - 17 $250,000) 18 (8) SR 0259, Boliver Underpass Conrail 19 Railroad over SR 0259, Fairfield 20 Township, Bridge Replacement 310,000 21 (Base Construction Allocation - 22 $200,000) 23 (Land Allocation - $10,000) 24 (Design and Contingencies - $100,000) 25 (9) SR 0271, Bridge over Mill Creek, 26 Ligonier Township, Bridge Painting 87,000 27 (Base Construction Allocation - 28 $87,000) 29 (10) SR 0711, Bridge over Mill Creek, 30 Ligonier Township, Bridge Painting 125,000 19990S0504B1019 - 568 -
1 (Base Construction Allocation - 2 $125,000) 3 (11) SR 0819, Bridge over Stauffer Bridge, 4 Scottdale Borough, Bridge Painting 92,000 5 (Base Construction Allocation - 6 $92,000) 7 (12) SR 0981, Bridge over Branch of Barron 8 Run, South Huntington Township, Bridge 9 Replacement 250,000 10 (Base Construction Allocation - 11 $250,000) 12 (13) SR 0982, Bradenville Bridge over 13 Saxman Run, Derry Township, Bridge 14 Replacement 330,000 15 (Base Construction Allocation - 16 $330,000) 17 (14) SR 1027, Stoney Run Bridge over 18 Stoney Run, Derry Township, Bridge 19 Replacement 340,000 20 (Base Construction Allocation - 21 $255,000) 22 (Land Allocation - $10,000) 23 (Design and Contingencies - $75,000) 24 (15) SR 2008, Fourmile Run Bridge over 25 Fourmile Run, Cook Township, Bridge 26 Painting 83,000 27 (Base Construction Allocation - 28 $83,000) 29 (16) SR 2010, Bridge over Branch of Boyer 30 Run, Mount Pleasant Township, Bridge 19990S0504B1019 - 569 -
1 Replacement 450,000 2 (Base Construction Allocation - 3 $250,000) 4 (Land Allocation - $25,000) 5 (Design and Contingencies - $175,000) 6 (17) SR 8036, New Stanton Ramp Bridge over 7 SR 3091, New Stanton Borough, Bridge 8 Rehabilitation 475,000 9 (Base Construction Allocation - 10 $395,000) 11 (Design and Contingencies - $80,000) 12 (18) SR 0030, SR 0030 over Mill Creek, 13 Ligonier Township, Bridge 14 Rehabilitation 200,000 15 (Base Construction Allocation - 16 $150,000) 17 (Design and Contingencies - $50,000) 18 (19) SR 0030, SR 0030 over Branch of 19 Loyalhanna Creek, Unity Township, 20 Bridge Replacement 245,000 21 (Base Construction Allocation - 22 $125,000) 23 (Land Allocation - $20,000) 24 (Design and Contingencies - $100,000) 25 (20) SR 0217, SR 0217 over Miller Run, 26 Derry Township, Bridge Replacement 293,000 27 (Base Construction Allocation - 28 $188,000) 29 (Land Allocation - $5,000) 30 (Design and Contingencies - $100,000) 19990S0504B1019 - 570 -
1 (21) SR 0259, SR 0259 over Branch of 2 Freeman Run, Fairfield Township, Bridge 3 Replacement 218,000 4 (Base Construction Allocation - 5 $113,000) 6 (Land Allocation - $5,000) 7 (Design and Contingencies - $100,000) 8 (22) SR 0381, SR 0381 over Branch of 9 Loyalhanna Creek, Cook Township, Bridge 10 Replacement 670,000 11 (Base Construction Allocation - 12 $450,000) 13 (Land Allocation - $20,000) 14 (Design and Contingencies - $200,000) 15 (23) SR 0381, SR 0381 over Camp Run, 16 Donegal Township, Bridge Replacement 608,000 17 (Base Construction Allocation - 18 $388,000) 19 (Land Allocation - $20,000) 20 (Design and Contingencies - $200,000) 21 (24) SR 0711, SR 0711 over Mill Creek, 22 Ligonier Township, Bridge Replacement 600,000 23 (Base Construction Allocation - 24 $450,000) 25 (Land Allocation - $50,000) 26 (Design and Contingencies - $100,000) 27 (25) SR 0982, SR 0982 over Jacobs Creek, 28 Mount Pleasant Township, Bridge 29 Replacement 938,000 30 (Base Construction Allocation - 19990S0504B1019 - 571 -
1 $688,000) 2 (Land Allocation - $50,000) 3 (Design and Contingencies - $200,000) 4 (26) SR 0982, SR 0982 over Nine Mile Run, 5 Unity Township, Bridge Replacement 348,000 6 (Base Construction Allocation - 7 $238,000) 8 (Land Allocation - $10,000) 9 (Design and Contingencies - $100,000) 10 (27) SR 0982, SR 0982 over Indian Camp 11 Run, Unity Township, Bridge 12 Replacement 335,000 13 (Base Construction Allocation - 14 $225,000) 15 (Land Allocation - $10,000) 16 (Design and Contingencies - $100,000) 17 (28) SR 1004, SR 1004 over Hendricks 18 Creek, Fairfield Township, Bridge 19 Replacement 200,000 20 (Base Construction Allocation - 21 $170,000) 22 (Land Allocation - $10,000) 23 (Design and Contingencies - $20,000) 24 (29) SR 1006, SR 1006 over Freeman Run, 25 Fairfield Township, Bridge Replacement 833,000 26 (Base Construction Allocation - 27 $613,000) 28 (Land Allocation - $20,000) 29 (Design and Contingencies - $200,000) 30 (30) SR 1006, West Bolivar Bridge near 19990S0504B1019 - 572 -
1 Treasure Island, Fairfield Township, 2 Bridge Replacement 200,000 3 (Base Construction Allocation - 4 $170,000) 5 (Land Allocation - $10,000) 6 (Design and Contingencies - $20,000) 7 (31) SR 1007, SR 1007 over Tubmill Run, 8 Fairfield Township, Bridge Replacement 465,000 9 (Base Construction Allocation - 10 $350,000) 11 (Land Allocation - $15,000) 12 (Design and Contingencies - $100,000) 13 (32) SR 1012, SR 1012 over Branch of Megee 14 Run, Derry Township, Bridge 15 Replacement 318,000 16 (Base Construction Allocation - 17 $213,000) 18 (Land Allocation - $5,000) 19 (Design and Contingencies - $100,000) 20 (33) SR 1014, SR 1014 over Abandoned 21 Railroad, Derry Township, Bridge 22 Replacement 268,000 23 (Base Construction Allocation - 24 $163,000) 25 (Land Allocation - $5,000) 26 (Design and Contingencies - $100,000) 27 (34) SR 1015, SR 1015 over Hypocrite 28 Creek, Fairfield Township, Bridge 29 Replacement 200,000 30 (Base Construction Allocation - 19990S0504B1019 - 573 -
1 $170,000) 2 (Land Allocation - $10,000) 3 (Design and Contingencies - $20,000) 4 (35) SR 1027, SR 1027 over Branch of Stony 5 Run, Derry Township, Bridge 6 Replacement 305,000 7 (Base Construction Allocation - 8 $200,000) 9 (Land Allocation - $5,000) 10 (Design and Contingencies - $100,000) 11 (36) SR 1031, SR 1031 over McCune Run, 12 Derry Township, Bridge Replacement 293,000 13 (Base Construction Allocation - 14 $188,000) 15 (Land Allocation - $5,000) 16 (Design and Contingencies - $100,000) 17 (37) SR 2006, SR 2006 over Branch of 18 Jacobs Creek, Mt. Pleasant Township, 19 Bridge Replacement 403,000 20 (Base Construction Allocation - 21 $288,000) 22 (Land Allocation - $15,000) 23 (Design and Contingencies - $100,000) 24 (38) SR 2007, SR 2007 over Shupe Run, Mt. 25 Pleasant Township, Bridge Replacement 218,000 26 (Base Construction Allocation - 27 $113,000) 28 (Land Allocation - $5,000) 29 (Design and Contingencies - $100,000) 30 (39) SR 2012, SR 2012 over Brinker Run, 19990S0504B1019 - 574 -
1 Mt. Pleasant Township, Bridge 2 Replacement 415,000 3 (Base Construction Allocation - 4 $300,000) 5 (Land Allocation - $15,000) 6 (Design and Contingencies - $100,000) 7 (40) SR 2021, SR 2021 over Sewickley 8 Creek, Mt. Pleasant Township, Bridge 9 Replacement 1,463,000 10 (Base Construction Allocation - 11 $1,213,000) 12 (Land Allocation - $50,000) 13 (Design and Contingencies - $200,000) 14 (41) SR 2025, SR 2025 over Tributary of 15 Jacobs Creek, Mt. Pleasant Township, 16 Bridge Replacement 250,000 17 (Base Construction Allocation - 18 $225,000) 19 (Design and Contingencies - $25,000) 20 (42) SR 4034, SR 4034 over Pine Run, 21 Allegheny Township, Bridge Replacement 818,000 22 (Base Construction Allocation - 23 $588,000) 24 (Land Allocation - $30,000) 25 (Design and Contingencies - $200,000) 26 (43) SR 4071, SR 4071 over Branch of Pine 27 Run, Allegheny Township, Bridge 28 Replacement 305,000 29 (Base Construction Allocation - 30 $200,000) 19990S0504B1019 - 575 -
1 (Land Allocation - $5,000) 2 (Design and Contingencies - $100,000) 3 (44) SR 4089, SR 4089 over Branch of 4 Chartiers Run, Allegheny Township, 5 Bridge Replacement 348,000 6 (Base Construction Allocation - 7 $238,000) 8 (Land Allocation - $10,000) 9 (Design and Contingencies - $100,000) 10 (45) T-987, (formerly SR 1071) over 11 Hypocrite Creek, Fairfield Township, 12 Four State Bridges, Bridge Replacement 800,000 13 (Base Construction Allocation - 14 $680,000) 15 (Land Allocation - $40,000) 16 (Design and Contingencies - $80,000) 17 (46) SR 0381, SR 0381 over Laughlintown 18 Run, Ligonier Township, Bridge 19 Replacement 465,000 20 (Base Construction Allocation - 21 $350,000) 22 (Land Allocation - $15,000) 23 (Design and Contingencies - $100,000) 24 (47) SR 2043, SR 2043 over Two Mile Run, 25 Ligonier Township, Bridge Replacement 465,000 26 (Base Construction Allocation - 27 $350,000) 28 (Land Allocation - $15,000) 29 (Design and Contingencies - $100,000) 30 (48) SR 2045, SR 2045 over Two Mile Run, 19990S0504B1019 - 576 -
1 Ligonier Township, Bridge Replacement 465,000 2 (Base Construction Allocation - 3 $350,000) 4 (Land Allocation - $15,000) 5 (Design and Contingencies - $100,000) 6 (49) SR 2045, SR 2045 over Loyalhanna 7 Creek, Ligonier Township, Bridge 8 Replacement 1,588,000 9 (Base Construction Allocation - 10 $1,313,000) 11 (Land Allocation - $75,000) 12 (Design and Contingencies - $200,000) 13 (50) SR 0119, Bridge No.2 over Crabtree 14 Creek, Hempfield Township, Bridge 15 Replacement 577,000 16 (Base Construction Allocation - 17 $377,000) 18 (Land Allocation - $25,000) 19 (Design and Contingencies - $175,000) 20 (51) SR 8036, New Stanton Ramp Bridge over 21 SR 3091, Turnback Project, New Stanton 22 Borough, Bridge Rehabilitation 475,000 23 (Base Construction Allocation - 24 $395,000) 25 (Design and Contingencies - $80,000) 26 (52) SR 2045, Bridge over Loyalhanna 27 Creek, Ligonier Township, Bridge 28 Replacement 800,000 29 (Base Construction Allocation - 30 $600,000) 19990S0504B1019 - 577 -
1 (Land Allocation - $25,000) 2 (Design and Contingencies - $175,000) 3 (53) SR 3037, BRIDGE OVER BRANCH OF <-- 4 SEWICKLEY CREEK, SOUTH HUNTINGDON 5 TOWNSHIP, BRIDGE REPLACEMENT 425,000 6 (BASE CONSTRUCTION ALLOCATION - 7 $225,000) 8 (LAND ALLOCATION - $25,000) 9 (DESIGN AND CONTINGENCIES - $175,000) 10 (54) SR 3075, BRIDGE OVER BRANCH OF 11 SEWICKLEY CREEK, HEMPFIELD TOWNSHIP, 12 BRIDGE REPLACEMENT 319,000 13 (BASE CONSTRUCTION ALLOCATION - 14 $94,000) 15 (LAND ALLOCATION - $50,000) 16 (DESIGN AND CONTINGENCIES - $175,000) 17 (55) SR 0259, BOLIVAR BRIDGE OVER 18 CONEMAUGH RIVER, BRIDGE REPLACEMENT 6,750,000 19 (BASE CONSTRUCTION ALLOCATION - 20 $5,500,000) 21 (LAND ALLOCATION - $750,000) 22 (DESIGN AND CONTINGENCIES - $500,000) 23 Section 70. Wyoming County. 24 (a) Local Bridges 25 (1) Exeter Township, T-336, Bridge No.1, 2 26 Miles Southwest of Falls, Bridge 27 Replacement 280,000 28 (Base Construction Allocation - 29 $240,000) 30 (Land Allocation - $10,000) 19990S0504B1019 - 578 -
1 (Design and Contingencies - $30,000) 2 (2) Falls Township, T-336 over White Lock 3 Stream, Bridge Replacement 280,000 4 (Base Construction Allocation - 5 $240,000) 6 (Land Allocation - $10,000) 7 (Design and Contingencies - $30,000) 8 (3) Exeter Township, T-336 over Mill 9 Creek, Bridge Replacement 214,000 10 (Base Construction Allocation - 11 $166,000) 12 (Land Allocation - $20,000) 13 (Design and Contingencies - $28,000) 14 (4) Eaton Township, T-413, Pedestrian 15 Bridge over Bowman's Creek at 16 Eatonville, Bridge Rehabilitation 125,000 17 (Base Construction Allocation - 18 $113,000) 19 (Design and Contingencies - $12,000) 20 (b) State Bridges 21 (1) SR 3001, Bridge at Junction with SR 22 4004 over Branch of Susquehanna River, 23 Windham Township, Bridge Painting 60,000 24 (Base Construction Allocation - 25 $50,000) 26 (Design and Contingencies - $10,000) 27 (2) State Bridges, Countywide Bridge Zone 28 Painting, Bridge Painting 370,000 29 (Base Construction Allocation - 30 $350,000) 19990S0504B1019 - 579 -
1 (Land Allocation - $10,000) 2 (Design and Contingencies - $10,000) 3 (3) SR 0006, Meshoppen Creek Bridge over 4 Meshoppen Creek, Meshoppen Borough, 5 Bridge Rehabilitation 340,000 6 (Base Construction Allocation - 7 $300,000) 8 (Design and Contingencies - $40,000) 9 (4) SR 3003, Bowmans Creek Bridge over 10 Bowmans Creek, Eaton Township, Bridge 11 Replacement 260,000 12 (Base Construction Allocation - 13 $200,000) 14 (Design and Contingencies - $60,000) 15 Section 71. York County. 16 (a) Local Bridges 17 (1) Carroll Township, Gettysburg Road 18 Bridge over Yellow Breeches Creek, 19 Bridge Replacement 860,000 20 (Base Construction Allocation - 21 $700,000) 22 (Land Allocation - $10,000) 23 (Design and Contingencies - $150,000) 24 (2) Codorus Township, Seitzville Road over 25 South Branch of Codorus Creek, Bridge 26 Replacement 300,000 27 (Base Construction Allocation - 28 $200,000) 29 (Land Allocation - $15,000) 30 (Design and Contingencies - $85,000) 19990S0504B1019 - 580 -
1 (3) Dover Township, Cardinal Lane over Fox 2 Run, Bridge Replacement 115,000 3 (Base Construction Allocation - 4 $70,000) 5 (Land Allocation - $15,000) 6 (Design and Contingencies - $30,000) 7 (4) Dover Township, Conewago Road over 8 Salem Run, Bridge Replacement 300,000 9 (Base Construction Allocation - 10 $200,000) 11 (Land Allocation - $15,000) 12 (Design and Contingencies - $85,000) 13 (5) East Hopewell Township, South Church 14 Street Extended, Bridge No.1, Bridge 15 Rehabilitation 9,000 16 (Base Construction Allocation - $8,000) 17 (Design and Contingencies - $1,000) 18 (6) East Hopewell Township, South Church 19 Street Extended, Bridge No.2, over 20 Rambo Run, Bridge Rehabilitation 60,000 21 (Base Construction Allocation - 22 $50,000) 23 (Design and Contingencies - $10,000) 24 (7) East Hopewell Township, Manifold 25 School Road Bridge, Bridge 26 Rehabilitation 7,000 27 (Base Construction Allocation - $6,000) 28 (Design and Contingencies - $1,000) 29 (8) East Hopewell Township, Trout School 30 Road Bridge, Bridge Replacement 45,000 19990S0504B1019 - 581 -
1 (Base Construction Allocation - 2 $30,000) 3 (Land Allocation - $5,000) 4 (Design and Contingencies - $10,000) 5 (9) Hellam Township, Valley Acres Road 6 over Tributary of Kreutz Creek, Bridge 7 Rehabilitation 40,000 8 (Base Construction Allocation - 9 $35,000) 10 (Design and Contingencies - $5,000) 11 (10) Hellam Township, Libhart Mill Road 12 over Tributary of Kreutz Creek, Bridge 13 Rehabilitation 40,000 14 (Base Construction Allocation - 15 $35,000) 16 (Design and Contingencies - $5,000) 17 (11) Manchester Township, T-900, Woodland 18 View Drive over Conrail, Bridge 19 Replacement 395,000 20 (Base Construction Allocation - 21 $275,000) 22 (Land Allocation - $30,000) 23 (Design and Contingencies - $90,000) 24 (12) Manchester Township, T-940, Bear Road 25 2,000 Feet North of Susquehanna Trail, 26 Bridge Replacement 40,000 27 (Base Construction Allocation - 28 $25,000) 29 (Land Allocation - $5,000) 30 (Design and Contingencies - $10,000) 19990S0504B1019 - 582 -
1 (13) Manheim Township, T-320 over Unnamed 2 Tributary of Gunpowder Falls Creek, 3 Bridge Replacement 150,000 4 (Base Construction Allocation - 5 $100,000) 6 (Land Allocation - $10,000) 7 (Design and Contingencies - $40,000) 8 (14) Manheim Township, T-346 over West 9 Branch of Codorus Creek, Bridge 10 Replacement 250,000 11 (Base Construction Allocation - 12 $190,000) 13 (Land Allocation - $10,000) 14 (Design and Contingencies - $50,000) 15 (15) Manheim Township, T-357 over Unnamed 16 Tributary of West Branch of Codorus 17 Creek, Bridge Replacement 160,000 18 (Base Construction Allocation - 19 $110,000) 20 (Land Allocation - $10,000) 21 (Design and Contingencies - $40,000) 22 (16) Manheim Township, T-370 over West 23 Branch of Codorus Creek, Bridge 24 Replacement 200,000 25 (Base Construction Allocation - 26 $140,000) 27 (Land Allocation - $10,000) 28 (Design and Contingencies - $50,000) 29 (17) Manheim Township, T-413 over West 30 Branch of Codorus Creek, Bridge 19990S0504B1019 - 583 -
1 Replacement 150,000 2 (Base Construction Allocation - 3 $100,000) 4 (Land Allocation - $10,000) 5 (Design and Contingencies - $40,000) 6 (18) Manheim Township, Tannery Road over 7 West Branch of Codorus Creek, Bridge 8 Replacement 250,000 9 (Base Construction Allocation - 10 $180,000) 11 (Land Allocation - $10,000) 12 (Design and Contingencies - $60,000) 13 (19) Paradise Township, Shady Dell Road, 14 Bridge Replacement 190,000 15 (Base Construction Allocation - 16 $110,000) 17 (Land Allocation - $10,000) 18 (Design and Contingencies - $70,000) 19 (20) Paradise Township, Beaver Creek Road 20 over Beaver Creek, Bridge Replacement 275,000 21 (Base Construction Allocation - 22 $195,000) 23 (Land Allocation - $10,000) 24 (Design and Contingencies - $70,000) 25 (21) Penn Township, Center Street over 26 Tributary of Oil Creek, Bridge 27 Replacement 183,000 28 (Base Construction Allocation - 29 $163,000) 30 (Land Allocation - $10,000) 19990S0504B1019 - 584 -
1 (Design and Contingencies - $10,000) 2 (22) Penn Township, Westminster Avenue 3 over Plum Creek, Bridge Replacement 230,000 4 (Base Construction Allocation - 5 $207,000) 6 (Land Allocation - $8,000) 7 (Design and Contingencies - $15,000) 8 (23) Penn Township, Park Heights over 9 Tributary of Plum Creek, Bridge 10 Replacement 244,000 11 (Base Construction Allocation - 12 $234,000) 13 (Design and Contingencies - $10,000) 14 (24) Red Lion Borough, North Charles 15 Street over Former Maryland and 16 Pennsylvania Railroad, Bridge 17 Replacement 395,000 18 (Base Construction Allocation - 19 $275,000) 20 (Land Allocation - $30,000) 21 (Design and Contingencies - $90,000) 22 (25) Spring Garden Township, Tri Hill Road 23 over Tyler Run, Bridge Replacement 200,000 24 (Base Construction Allocation - 25 $120,000) 26 (Land Allocation - $20,000) 27 (Design and Contingencies - $60,000) 28 (26) Windsor Borough, West Gay Street over 29 Fishing Creek, Bridge Replacement 200,000 30 (Base Construction Allocation - 19990S0504B1019 - 585 -
1 $120,000) 2 (Land Allocation - $20,000) 3 (Design and Contingencies - $60,000) 4 (27) York Township, School Street over 5 Branch of Mill Creek, Bridge 6 Replacement 250,000 7 (Base Construction Allocation - 8 $200,000) 9 (Design and Contingencies - $50,000) 10 (28) Conewago Township, T-956 over Billion 11 Run, Bridge Replacement 290,000 12 (Base Construction Allocation - 13 $220,000) 14 (Land Allocation - $10,000) 15 (Design and Contingencies - $60,000) 16 (29) Conewago Township, T-956 over Poplar 17 Run, Bridge Replacement 310,000 18 (Base Construction Allocation - 19 $240,000) 20 (Land Allocation - $10,000) 21 (Design and Contingencies - $60,000) 22 (30) NEWBERRY TOWNSHIP, INTERSECTION OF SR <-- 23 1009 AND SR 0262, BRIDGE OVER FISHING 24 CREEK, BRIDGE REPLACEMENT 750,000 25 (31) NEWBERRY TOWNSHIP AND GOLDSBORO 26 BOROUGH, SR 0262 AND SR 1009, BRIDGE 27 OVER FISHING CREEK, BRIDGE REPLACEMENT 800,000 28 (b) State Bridges 29 (1) SR 0194, Broadway Street Bridge over 30 Red Run, Washington Township, Bridge 19990S0504B1019 - 586 -
1 Replacement 245,000 2 (Base Construction Allocation - 3 $150,000) 4 (Land Allocation - $10,000) 5 (Design and Contingencies - $85,000) 6 (2) SR 0234, East Berlin Road Bridge over 7 Paradise Creek, Jackson Township, 8 Bridge Replacement 325,000 9 (Base Construction Allocation - 10 $250,000) 11 (Land Allocation - $10,000) 12 (Design and Contingencies - $65,000) 13 (3) SR 3074, Smoketown Road Bridge over 14 Cod Creek, Manheim Township, Bridge 15 Replacement 325,000 16 (Base Construction Allocation - 17 $215,000) 18 (Land Allocation - $10,000) 19 (Design and Contingencies - $100,000) 20 (4) SR 0116, York Street over Tributary of 21 Oil Creek, Penn Township, Bridge 22 Replacement 275,000 23 (Base Construction Allocation - 24 $240,000) 25 (Land Allocation - $15,000) 26 (Design and Contingencies - $20,000) 27 (5) SR 0116, SR 0116 over Codorus Creek, 28 Spring Grove Borough, Bridge 29 Replacement 300,000 30 (Base Construction Allocation - 19990S0504B1019 - 587 -
1 $240,000) 2 (Land Allocation - $15,000) 3 (Design and Contingencies - $45,000) 4 (6) SR 0194, Frederick Street over Plum 5 Creek, Penn Township, Bridge 6 Replacement 262,000 7 (Base Construction Allocation - 8 $234,000) 9 (Land Allocation - $8,000) 10 (Design and Contingencies - $20,000) 11 (7) SR 1012, Emig Road over Conrail, 12 Manchester Township, Bridge 13 Replacement 395,000 14 (Base Construction Allocation - 15 $275,000) 16 (Land Allocation - $30,000) 17 (Design and Contingencies - $90,000) 18 (8) SR 2031, Penn Street over Fishing 19 Creek, Windsor Borough, Bridge 20 Replacement 200,000 21 (Base Construction Allocation - 22 $120,000) 23 (Land Allocation - $20,000) 24 (Design and Contingencies - $60,000) 25 (9) SR 3001, South George Street over 26 Tyler Run, Spring Garden Township, 27 Bridge Replacement 200,000 28 (Base Construction Allocation - 29 $120,000) 30 (Land Allocation - $20,000) 19990S0504B1019 - 588 -
1 (Design and Contingencies - $60,000) 2 (10) SR 3074, Smoketown Road Bridge over 3 Codorus Creek, Manheim Township, Bridge 4 Replacement 240,000 5 (Base Construction Allocation - 6 $150,000) 7 (Land Allocation - $10,000) 8 (Design and Contingencies - $80,000) 9 (11) SR 3074, BRIDGE OVER TRIBUTARY OF <-- 10 CODORUS CREEK, MANHEIM TOWNSHIP, BRIDGE 11 REPLACEMENT 750,000 12 (BASE CONSTRUCTION ALLOCATION - 13 $555,000) 14 (LAND ALLOCATION - $56,000) 15 (DESIGN AND CONTINGENCIES - $139,000) 16 (12) SR 3015, BRIDGE OVER CENTERVILLE 17 CREEK, CODORUS TOWNSHIP, BRIDGE 18 REPLACEMENT 477,000 19 (BASE CONSTRUCTION ALLOCATION - 20 $354,000) 21 (LAND ALLOCATION - $35,000) 22 (DESIGN AND CONTINGENCIES - $88,000) 23 (13) SR 1009, BRIDGE OVER FISHING CREEK, 24 NEWBERRY TOWNSHIP, BRIDGE REPLACEMENT 815,000 25 (BASE CONSTRUCTION ALLOCATION - 26 $604,000) 27 (LAND ALLOCATION - $60,000) 28 (DESIGN AND CONTINGENCIES - $151,000) 29 (14) PA 216, BRIDGE OVER CENTERVILLE 30 CREEK, CODORUS TOWNSHIP, BRIDGE 19990S0504B1019 - 589 -
1 REPLACEMENT 604,000 2 (BASE CONSTRUCTION ALLOCATION - 3 $447,000) 4 (LAND ALLOCATION - $45,000) 5 (DESIGN AND CONTINGENCIES - $112,000) 6 (15) SR 2038, BRIDGE OVER LITTLE MUDDY 7 CREEK, EAST HOPEWELL TOWNSHIP, BRIDGE 8 REPLACEMENT 366,000 9 (BASE CONSTRUCTION ALLOCATION - 10 $271,000) 11 (LAND ALLOCATION - $27,000) 12 (DESIGN AND CONTINGENCIES - $68,000) 13 Section 72. Statewide. 14 Construction of advanced wetland mitigation 15 projects necessary to replace wetlands displaced 16 by bridge projects authorized under the act of 17 December 8, 1982 (P.L.848, No.235), known as the 18 Highway-Railroad and Highway Bridge Capital Budget 19 Act for 1982-1983 3,100,000 20 (Base Construction Allocation - 21 $2,500,000) 22 (Land Allocation - $350,000) 23 (Design and Contingencies - $250,000) 24 Section 72.1. State forestry bridge projects itemized. 25 Projects in the category of State forestry bridge projects to 26 be constructed by the Department of Conservation and Natural 27 Resources, its successors or assigns, and to be financed by oil 28 company franchise tax revenues pursuant to 75 Pa.C.S. § 29 9502(a)(2)(iv) (relating to imposition of tax), are hereby 30 itemized, together with their respective estimated costs, as 19990S0504B1019 - 590 -
1 follows: 2 (a) Local Bridges (Reserved) 3 (b) State Forestry Bridges 4 (1) Adams County 5 (A) Replacement of Bridge No.01-0005, 6 District Road Bridge over Carbaugh 7 Run 120,000 8 (B) Replacement of Bridge No.01-0004, 9 Dead Womans Hollow Road Bridge over 10 Mountain Creek 150,000 11 (2) Bedford County 12 (A) Replacement of Bridge No.02-0002, 13 Wertz Road Bridge over Cove Creek 100,000 14 (B) Replacement of Bridge No.02-0001, 15 Wertz Road Bridge over Cove Creek 150,000 16 (3) Cameron County 17 (A) Replacement of Bridge No.13-0012, 18 Brooks Run Road Bridge over Brooks 19 Road 220,000 20 (B) Replacement of Bridge No.13-0060, 21 Brooks State House Bridge over 22 Brooks Road 250,000 23 (C) Replacement of Bridge No.13-0037, 24 Mix Run Road Bridge over Mix Run 200,000 25 (D) Replacement of Bridge No.13-0038, 26 Mix Run Road over Mix Run 166,000 27 (4) Centre County 28 (A) Replacement of Bridge No.07-0010, 29 Siglerville Millheim Pike Bridge 162,000 30 (B) Replacement of Bridge No.07-0015, 19990S0504B1019 - 591 -
1 Green Valley Road Bridge 260,000 2 (C) Replacement of Bridge No.07-0033, 3 Pine Creek Road Bridge 386,000 4 (D) Replacement of Bridge No.07-0045, 5 McCall Dam Road Bridge over White 6 Deer Creek 180,000 7 (E) Replacement of Bridge No.09-0030, 8 Six Mile Run Bridge 192,000 9 (F) Replacement of Bridge No.10-0028, 10 State Line Road Bridge 196,000 11 (G) Replacement of Bridge No.05-0003, 12 Krise Valley Road Bridge over 13 Potter Run 100,000 14 (H) Replacement of Bridge No.05-0004, 15 Bear Meadows Road Bridge over 16 Sinking Creek 100,000 17 (I) Replacement of Bridge No.05-0005, 18 Bear Meadows Road Bridge over 19 Galbraith Run 150,000 20 (J) Replacement of Bridge No.07-0008, 21 Poe Valley Road Bridge over Big Poe 22 Creek 200,000 23 (K) Replacement of Bridge No.07-0028, 24 Cherry Run Road Bridge over Cherry 25 Run 102,000 26 (L) Replacement of Bridge No.07-0029, 27 Cherry Run Road Bridge over Cherry 28 Run 240,000 29 (M) Replacement of Bridge No.07-0035, 30 Stoney Run Road Bridge over Pine 19990S0504B1019 - 592 -
1 Creek 375,000 2 (N) Replacement of Bridge No.09-0026, 3 Huckleberry Road Bridge over Black 4 Moshannon Creek 250,000 5 (O) Replacement of Bridge No.09-0029, 6 Claymine Road Bridge over Six Mile 7 Run 200,000 8 (P) Replacement of Bridge No.10-0026, 9 Panther Road Bridge over Wolf Run 150,000 10 (Q) Replacement of Bridge No.07-0007, 11 Poe Paddy Drive Bridge over Big Poe 12 Creek 170,000 13 (5) Clearfield County 14 (A) Replacement of Bridge No.09-0005, 15 Tyler Road Bridge over Laurel Run 284,000 16 (B) Replacement of Bridge No.09-0019, 17 Dent's Branch Road Bridge 282,000 18 (C) Replacement of Bridge No.09-0022, 19 Merrill Road Bridge 197,000 20 (D) Replacement of Bridge No.09-0012, 21 Little Medix Road Bridge over 22 Little Medix Run 220,000 23 (E) Replacement of Bridge No.09-0013, 24 Little Medix Road Bridge over 25 Little Medix Run 100,000 26 (F) Replacement of Bridge No.09-0014, 27 Little Medix Road Bridge over 28 Little Medix Run 100,000 29 (G) Replacement of Bridge No.09-0015, 30 Little Medix Road Bridge over 19990S0504B1019 - 593 -
1 Little Medix Run 100,000 2 (H) Replacement of Bridge No.09-0018, 3 Dent's Branch Road Bridge over 4 Dent's Branch Street 160,000 5 (I) Replacement of Bridge No.09-0020, 6 Dent's Branch Road Bridge over 7 Dent's Branch Street 165,000 8 (J) Replacement of Bridge No.09-0021, 9 Ames Road Bridge over Deer Creek 145,000 10 (K) Replacement of Bridge No.09-0023, 11 Lost Run Road Bridge over Giffor 12 Run 138,000 13 (L) Replacement of Bridge No.09-0034, 14 Reservoir Road Bridge over Upper 15 Three Run 120,000 16 (6) Clinton County 17 (A) Replacement of Bridge No.10-0033, 18 Cooks Run Road Bridge over Cooks 19 Run 110,000 20 (B) Replacement of Bridge No.10-0042, 21 Two Mile Road Bridge 100,000 22 (C) Replacement of Bridge No.10-0043, 23 Big Basin Road Bridge over Shintown 24 Run 206,000 25 (D) Replacement of Bridge No.10-059, 26 Bridge over Right Branch of Young 27 Womans Creek Road 287,000 28 (E) Replacement of Bridge No.10-0064, 29 Trout Run Bridge 255,000 30 (F) Replacement of Bridge No.15-0021, 19990S0504B1019 - 594 -
1 County Line Road Bridge 167,000 2 (G) Replacement of Bridge No.10-0032, 3 Cooks Run Road Bridge over Crowley 4 Run 145,000 5 (H) Replacement of Bridge No.10-0044, 6 Robbins Road Bridge over Shintown 7 Run 120,000 8 (I) Replacement of Bridge No.10-0051, 9 Fork Hill Road Bridge over Lebo 10 Run 168,000 11 (J) Replacement of Bridge No.10-0052, 12 Left Branch Young Womans Road 13 Bridge over Mud Lick Run 140,000 14 (K) Replacement of Bridge No.10-0053, 15 Left Branch Young Womans Road 16 Bridge over Shingle Branch 145,000 17 (L) Replacement of Bridge No.10-0054, 18 Left Branch Young Womans Road 19 Bridge over Greenlick Run 135,000 20 (M) Replacement of Bridge No.10-0057, 21 Sandy Run Road Bridge over Paddy 22 Run 140,000 23 (N) Replacement of Bridge No.10-0061, 24 Graham Road Bridge over Ferney Run 135,000 25 (O) Replacement of Bridge No.10-0063, 26 Hyner Run Road Bridge over Long 27 Fork 110,000 28 (P) Replacement of Bridge No.10-0035, 29 Bridge over Camp Run 100,000 30 (Q) Replacement of Bridge No.10-0037, 19990S0504B1019 - 595 -
1 Bridge over Cooks Run 160,000 2 (R) Replacement of Bridge No.12-0032, 3 Gotshall Road Bridge over Gotshall 4 Run 120,000 5 (S) Replacement of Bridge No.10-0036, 6 over Rock Run 150,000 7 (T) Replacement of Bridge No.07-0054, 8 Long Run 91,000 9 (U) Replacement of Bridge No.07-0055, 10 over Cooper Run 70,000 11 (V) Replacement of Bridge No.10-0065, 12 Old Woods Road over Two Mile Run 100,000 13 (7) Cumberland County 14 (A) Replacement of Bridge No.01-0006, 15 Woodrow Road Run Bridge over 16 Mountain Creek 150,000 17 (B) Replacement of Bridge No.01-0010, 18 Milesburn Road Bridge 102,000 19 (C) Replacement of Bridge No.01-0008, 20 Strohms Hollow Road Bridge over 21 Strohms Hollow Run 138,000 22 (D) Replacement of Bridge No.01-0023, 23 Togg Run Road Bridge over Togg Run 138,000 24 (8) Dauphin County 25 (A) Replacement of Large Culvert, 26 White Oak Road Bridge over White 27 Oak Run 100,000 28 (9) Elk County 29 (A) Replacement of Bridge No.13-0040, 30 Red Run Road Bridge 160,000 19990S0504B1019 - 596 -
1 (B) Replacement of Bridge No.13-0049, 2 Shaffer Draft Road Bridge 175,000 3 (C) Replacement of Bridge No.13-0050, 4 West Hicks Run Road Bridge 175,000 5 (D) Replacement of Bridge No.13-0052, 6 Bridge over East Branch of Hicks 7 Run 175,000 8 (E) Replacement of Bridge No.13-0053, 9 Bridge over East Branch of Hicks 10 Run 175,000 11 (F) Replacement of Bridge No.09-0006, 12 Blackwell Road Bridge over Laurel 13 Road 142,000 14 (G) Replacement of Bridge No.13-0028, 15 Porcupine Road Bridge over Dent's 16 Run 183,000 17 (H) Replacement of Bridge No.13-0032, 18 Dent's Run Road Bridge over Little 19 Dent's Run 110,000 20 (I) Replacement of Bridge No.13-0039, 21 Mix Run Road Bridge over Red Run 184,000 22 (10) Franklin County 23 (A) Replacement of Bridge No.01-0016, 24 Wirt Road Bridge 147,000 25 (B) Replacement of Bridge No.01-0022, 26 Rattlesnake Run Road Bridge 149,000 27 (C) Replacement of Bridge No.01-0021, 28 Lindsay Lot Road Bridge over 29 Furnace Run 100,000 30 (D) Replacement of Bridge No.01-0019, 19990S0504B1019 - 597 -
1 Biesecker Gap Road Bridge over 2 Biesecker Run 110,000 3 (11) Huntingdon County 4 (A) Replacement of Bridge No.05-0012, 5 Colerain Road Bridge 235,000 6 (B) Replacement of Bridge No.05-0014, 7 Coopers Gap Road Bridge 160,000 8 (C) Replacement of Bridge No.05-0021, 9 Stone Creek Road Bridge 182,000 10 (D) Replacement of Bridge No.05-0027, 11 Diamond Valley Road Bridge over 12 Globe Run 100,000 13 (E) Replacement of Bridge No.05-0028, 14 Laurel Run Road Bridge 213,000 15 (F) Replacement of Bridge No.05-0051, 16 Coopers Gap Road Bridge 174,000 17 (G) Replacement of Bridge No.05-0010, 18 Martin Road Bridge over Standing 19 Stone Creek 173,000 20 (H) Replacement of Bridge No.05-0011, 21 Pennsylvania Furnace Road Bridge 22 over Globe Run 140,000 23 (I) Replacement of Bridge No.05-0017, 24 Pine Swamp Road Bridge over Shaver 25 Creek 150,000 26 (J) Replacement of Bridge No.05-0018, 27 Beidler Road Bridge over Laurel 28 Run 142,000 29 (K) Replacement of Bridge No.05-0020, 30 Rag Hollow Road Bridge over East 19990S0504B1019 - 598 -
1 Branch Stone Creek 150,000 2 (L) Replacement of Bridge No.05-0026, 3 Pennsylvania Furnace Road Bridge 4 over Pennsylvania Furnace Run 110,000 5 (M) Replacement of Bridge No.05-0019, 6 Stone Creek Road over Detweiler 7 Run 200,000 8 (N) Replacement of Bridge No.05-0022, 9 Seeger Road over Stone Creek 200,000 10 (12) Jefferson County 11 (A) Replacement of Bridge No.08-0003, 12 Callen Run Road Bridge over Callen 13 Run 200,000 14 (B) Replacement of Bridge No.08-0001, 15 Corbett Road Bridge over Clear 16 Creek 170,000 17 (13) Juniata County 18 (A) Replacement of Bridge No.03-0007, 19 Spectacle Gap Bridge 158,000 20 (B) Replacement of Bridge No.03-0005, 21 East Licking Drive Bridge over East 22 Licking Creek 242,000 23 (C) Replacement of Bridge No.03-0006, 24 East Licking Drive Bridge over East 25 Licking Creek 222,000 26 (13.1) Lackawanna County 27 (A) Replacement of Bridge No.11-9000, 28 Sassafras Road over Spring Run 80,000 29 (14) Lycoming County 30 (A) Replacement of Bridge No.12-0015, 19990S0504B1019 - 599 -
1 Rock Run Road Bridge 175,000 2 (B) Replacement of Bridge No.12-0016, 3 Rock Run Road Bridge 164,000 4 (C) Replacement of Bridge No.12-0019, 5 Little Bear Bridge 193,000 6 (D) Replacement of Bridge No.12-0020, 7 Little Bear Bridge 193,000 8 (E) Replacement of Bridge No.12-0021, 9 Little Bear Bridge 193,000 10 (F) Replacement of Bridge No.12-0022, 11 Little Bear Creek Road Bridge 237,000 12 (G) Replacement of Bridge No.12-0028, 13 Fourth Gap Road Bridge 100,000 14 (H) Replacement of Large Culvert, 15 Frances Road at Big Hollow 100,000 16 (I) Replacement of Bridge No.12-0017, 17 Yellow Dog Road Bridge over Rock 18 Run 245,000 19 (J) Replacement of Bridge No.12-0040, 20 English Run Road Bridge over 21 English Run 238,000 22 (K) Replacement of Bridge No.12-0046, 23 Morris Run Road Bridge over Slate 24 Run 240,000 25 (L) Replacement of Bridge No.12-0013, 26 Hillgrove Road Bridge over Pleasant 27 Stream 150,000 28 (M) Replacement of Bridge No.12-0027, 29 Cove Road Bridge over Fourth Gap 140,000 30 (N) Replacement of Bridge No.12-0023, 19990S0504B1019 - 600 -
1 Little Bear Road Bridge over Little 2 Bear Creek 120,000 3 (O) Replacement of Bridge No.12-0010, 4 Pleasant Stream Road over Bovier 5 Run 150,000 6 (15) Mifflin County 7 (A) Replacement of Bridge No.03-0008, 8 Spectacle Gap Road Bridge over East 9 Licking Creek 150,000 10 (B) Replacement of Bridge No.07-0004, 11 Havice Valley Road Bridge over 12 Panther Run 257,000 13 (C) Replacement of Bridge No.05-0051, 14 Cooper Gap Road Bridge over Cooper 15 Gap Run 172,000 16 (D) Replacement of Bridge No.07-0057, 17 Stillhouse Hollow Road Bridge over 18 Greens Valley Street 128,000 19 (E) Replacement of Bridge No.07-0003, 20 Havice Valley Road Bridge over 21 Swift Run 125,000 22 (16) Monroe County 23 (A) Replacement of Bridge No.19-0001, 24 Laurel Run Road Bridge 159,000 25 (17) Perry County 26 (A) Replacement of Bridge No.03-0010, 27 Elk Hill Road Bridge 152,000 28 (B) Replacement of Bridge No.03-0011, 29 Elk Hill Road Bridge 152,000 30 (C) Replacement of Bridge No.03-0014, 19990S0504B1019 - 601 -
1 Laurel Run Road Bridge over Laurel 2 Run, North Branch 100,000 3 (D) Replacement of Bridge No.03-0015, 4 Sheaffer Run Bridge, Undermining at 5 South Abutment 150,000 6 (E) Replacement of Bridge No.03-0016, 7 Laurel Run Road Bridge 185,000 8 (F) Replacement of Bridge No.03-0018, 9 Twin Bridge over Laurel Run 180,000 10 (G) Replacement of Culvert, Shearer 11 Dug Box Culvert 100,000 12 (H) Replacement of Culvert, Laurel Run 13 Road over Tributary of Laurel Run 60,000 14 (18) Pike County 15 (A) Replacement of Bridge No.19-0004, 16 Pine Flats Run Road Bridge 160,000 17 (B) Replacement of Bridge No.19-0005, 18 Bruce Lake Road Bridge over 19 Tributary Egypt Meadow Lake 120,000 20 (C) Replacement of Bridge No.19-0803, 21 Bruce Lake Road Bridge over Egypt 22 Meadow Lake 145,000 23 (D) Replacement of Bridge No.19-0002, 24 Hay Road Bridge over Middle Branch 115,000 25 (19) Potter County 26 (A) Replacement of Bridge No.15-0013, 27 Windfall Road Bridge 160,000 28 (B) Replacement of Bridge No.15-0015, 29 Joerg Run Road Bridge 160,000 30 (C) Replacement of Bridge No.15-0018, 19990S0504B1019 - 602 -
1 Lebo Run Road Bridge 160,000 2 (D) Replacement of Bridge No.15-0020, 3 Robinson Road Bridge 230,000 4 (E) Replacement of Bridge No.15-0024, 5 Robinson Road Bridge 140,000 6 (F) Replacement of Bridge No.16-0015, 7 Butternut Hollow Road Bridge over 8 Kettle Creek 110,000 9 (G) Replacement of Bridge No.15-0003, 10 Jones Run Road Bridge over Freeman 11 Run 175,000 12 (H) Replacement of Bridge No.15-0010, 13 Black Diamond Road Bridge over Big 14 Moores Run 163,000 15 (I) Replacement of Bridge No.15-0011, 16 Horton Run Road Bridge over East 17 Fork Sinnemahoning Creek 125,000 18 (J) Replacement of Bridge No.15-0014, 19 Hungry Hollow Road Bridge over 20 Cross Fork Creek 192,000 21 (K) Replacement of Bridge No.15-0025, 22 Nelson Run Road Bridge over Big 23 Nelson Run 138,000 24 (L) Replacement of Bridge No.15-0027, 25 Ellis Hollow Road Bridge over Nine 26 Mile Run 146,000 27 (M) Replacement of Bridge No.15-0012, 28 Bailey Run Bridge over Bailey Run 250,000 29 (N) Replacement of Bridge No.15-0019, 30 Twelve Mile Bridge over Spring 19990S0504B1019 - 603 -
1 Brook 107,000 2 (O) Replacement of Bridge No.15-0013 3 over Windfall Run Road over 4 Windfall Run in Forest District 5 No.3 196,000 6 (P) Replacement of Bridge No.15-0015 7 over Joerg Run Road over Joerg Run 8 in Forest District No.3 135,000 9 (Q) Replacement of Bridge No.15-0018 10 over Lebo Road over Lebo Run in 11 Forest District No.3 148,000 12 (20) Schuykill County 13 (A) Replacement of Bridge No.18-0003, 14 Panther Road Bridge over Panther 15 Creek 80,000 16 (21) Snyder County 17 (A) Replacement of Bridge No.07-0025, 18 Swift Run Road Bridge over Swift 19 Run 138,000 20 (22) Somerset County 21 (A) Replacement of Bridge No.04-0002, 22 Blue Hole Road Bridge 192,000 23 (B) Replacement of Bridge No.04-0008, 24 Cole Run Road Bridge 138,000 25 (C) Replacement of Bridge No.04-0004, 26 South Wolf Run Road Bridge over Tub 27 Mill Run 184,000 28 (D) Replacement of Bridge No.04-0006, 29 Jones Mill Run Road Bridge over 30 Jones Mill Run 140,000 19990S0504B1019 - 604 -
1 (E) Replacement of Bridge No.06-0002, 2 State Forest Road Bridge over 3 Tributary to Roaring Fork 82,000 4 (F) Replacement of Bridge No.06-0004, 5 Shade Road Bridge over Mile Run 131,000 6 (23) Sullivan County 7 (A) Replacement of Bridge No.20-0002, 8 Brunnerdale Road Bridge 220,000 9 (B) Replacement of Bridge No.20-0008, 10 Shanerburg Road Bridge 212,000 11 (C) Replacement of Bridge No.20-0011, 12 Shanerburg Road Bridge over 13 Shanerburg Run 110,000 14 (D) Replacement of Bridge No.20-0004, 15 Mill Creek Road Bridge over Mill 16 Creek 135,000 17 (E) Replacement of Bridge No.20-0005, 18 Mill Creek Road Bridge over Mill 19 Creek 100,000 20 (24) Tioga County 21 (A) Replacement of Bridge No.16-0004, 22 Left Asaph Road Bridge 248,000 23 (B) Replacement of Bridge No.16-0005, 24 Asaph Run Bridge 414,000 25 (C) Replacement of Bridge No.16-0010, 26 Painter Leetonia Road Bridge 170,000 27 (D) Replacement of Bridge No.16-0011, 28 Cedar Run Bridge 170,000 29 (E) Replacement of Bridge No.16-0020, 30 Mine Hole Road Bridge 107,000 19990S0504B1019 - 605 -
1 (F) Replacement of Bridge No.16-0003, 2 Left Asaph Road Bridge over Left 3 Asaph Run 186,000 4 (G) Replacement of Bridge No.16-0008, 5 Owasse Road Bridge over Chimney 6 Hollow 120,000 7 (H) Replacement of Bridge No.16-0015, 8 Butternut Hollow Road Bridge over 9 Kettle Creek 145,000 10 (I) Replacement of Bridge No.12-0049, 11 Francis Road Bridge over Francis 12 Branch 150,000 13 (J) Replacement of Bridge No.16-0016, 14 Bear Run Road Bridge over Cushman 15 Branch 160,000 16 (K) Replacement of Bridge No.16-0018, 17 Mine Hole Road Bridge over Mine 18 Hole Run 150,000 19 (L) Replacement of Bridge No.12-0002, 20 Left Asaph over Baker Branch 200,000 21 (M) Replacement of Bridge No.16-0019, 22 Mine Hole Road over East Mine Hole 23 Run 150,000 24 (25) Union County 25 (A) Replacement of Bridge No.07-0016, 26 Hoofnagle Road Bridge 235,000 27 (B) Replacement of Bridge No.07-0017, 28 Weikert Run Road Bridge 235,000 29 (C) Replacement of Bridge No.07-0047, 30 White Deer Creek Road Bridge 234,000 19990S0504B1019 - 606 -
1 (D) Replacement of Bridge No.07-0046, 2 Cooper Mill Road Bridge over White 3 Deer Creek 212,000 4 (E) Replacement of Bridge No.07-0048, 5 White Deer Creek Road Bridge over 6 White Deer Creek 235,000 7 (F) Replacement of Bridge No.07-0041, 8 Brandon Road Bridge over North 9 Branch of Buffalo Creek 107,000 10 (G) Replacement of Bridge No.07-0040, 11 Pine Creek Road Bridge over Rapid 12 Run 165,000 13 (26) Westmoreland County 14 (A) Replacement of Bridge No.04-0011, 15 Linn Run Road Bridge over Linn Run 125,000 16 (B) Replacement of Bridge No.04-0012, 17 Linn Run Road Bridge over Rock Run 135,000 18 Section 72.2. State park bridge projects itemized. 19 Projects in the category of State park bridge projects to be 20 constructed by the Department of Conservation and Natural 21 Resources, its successors or assigns, and to be financed by oil 22 company franchise tax revenues pursuant to 75 Pa.C.S. § 23 9502(a)(2)(iv) (relating to imposition of tax), are hereby 24 itemized, together with their respective estimated costs, as 25 follows: 26 (a) Local Bridges (Reserved) 27 (b) State Park Bridges 28 (1) Beaver County 29 (A) Replacement of Bridge No.13-1200 30 over Valley Road End in Raccoon 19990S0504B1019 - 607 -
1 Creek State Park 100,000 2 (B) Replacement of Bridge No.13-1201 3 over Valley Road Entrance in 4 Raccoon Creek State Park 250,000 5 (C) Replacement of Bridge No.13-1203 6 over Mineral Springs Road in 7 Raccoon Creek State Park 122,000 8 (D) Replacement of Bridge No.13-1204 9 over Service Yard in Raccoon Creek 10 State Park 109,000 11 (E) Replacement of Bridge No.13-1206 12 over Main Road West of Office in 13 Raccoon Creek State Park 370,000 14 (F) Replacement of Bridge No.13-1209 15 over Main Road Near W.T. Plant in 16 Raccoon Creek State Park 480,000 17 (2) Bedford County 18 (A) Replacement of Bridge No.02-0101 19 over Whysong Bridge in Blue Knob 20 State Park 120,000 21 (B) Replacement of Bridge No.02-0103 22 over Camp No.2 Bridge in Blue Knob 23 State Park 109,000 24 (C) Replacement of Bridge No.02-0108 25 over Camp No.1 Service Road in Blue 26 Knob State Park 100,000 27 (D) Replacement of Bridge No.02-0109 28 over No.1 Campground in Blue Knob 29 State Park 85,000 30 (E) Replacement of Bridge No.02-0110 19990S0504B1019 - 608 -
1 over Service Road in Blue Knob 2 State Park 100,000 3 (3) Berks County 4 (A) Replacement of Bridge No.06-0400 5 over Lenape Trail Bridge in French 6 Creek State Park 120,000 7 (B) Replacement of Bridge No.06-0402 8 over Scotts Run Lake South in 9 French Creek State Park 120,000 10 (C) Replacement of Bridge No.11-0701 11 over Forester Road in Nolde Forest 12 E.E.C. 125,000 13 (D) Replacement of Bridge No.11-0702 14 over Forester Road in Nolde Forest 15 E.E.C. 110,000 16 (E) Replacement of Bridge No.11-0703 17 over Boulevard Trail in Nolde 18 Forest E.E.C. 135,000 19 (F) Replacement of Bridge No.11-0704 20 over Watershed Trail in Nolde 21 Forest E.E.C. 109,000 22 (G) Replacement of Bridge No.11-0705 23 over Cabin Hollow Road in Nolde 24 Forest E.E.C. 109,000 25 (4) Blair County 26 (A) Replacement of Bridge No.18-0300 27 over Pump House in Canoe Creek 28 State Park 130,000 29 (5) Bucks County 30 (A) Replacement of Bridge No.16-0900 19990S0504B1019 - 609 -
1 over State Park Road in Ralph 2 Stover State Park 275,000 3 (B) Replacement of Bridge No.22-0600 4 over Service Road S.E. to Lake in 5 Nockamixon State Park 100,000 6 (C) Replacement of Bridge No.22-0601 7 over Park Service Road (S.E. Lake) 8 in Nockamixon State Park 109,000 9 (D) Replacement of Bridge No.22-0602 10 over Park Service Road in 11 Nockamixon State Park 100,000 12 (E) Replacement of Bridge No.25-1201 13 over No.1 Lane Trail Bridge in 14 Tyler State Park 100,000 15 (F) Replacement of Bridge No.25-1202 16 over Mill Dairy Trail Bridge in 17 Tyler State Park 109,000 18 (G) Replacement of Bridge No.25-1203 19 over Mill Dairy Trail Bridge in 20 Tyler State Park 109,000 21 (H) Replacement of Bridge No.25-1206 22 over Dairy Hill Trail Bridge in 23 Tyler State Park 109,000 24 (I) Replacement of Bridge No.25-1207 25 over No.1 Lake Trail Bridge in 26 Tyler State Park 109,000 27 (J) Replacement of Bridge No.25-1208 28 over No.1 Lane Trail Entrance in 29 Tyler State Park 115,000 30 (K) Replacement of Bridge No.25-1210 19990S0504B1019 - 610 -
1 over Biaker 2 Bridge in Tyler State 2 Park 250,000 3 (L) Replacement of Bridge No.25-1211 4 over Canoe Bridge Boat House in 5 Tyler State Park 225,000 6 (M) Replacement of Bridge No.50-0569 7 over Mill Creek Waste Gate in 8 Delaware Canal State Park 120,000 9 (N) Replacement of Bridge No.50-1017 10 over Waste Gate in Delaware Canal 11 State Park 110,000 12 (O) Replacement of Bridge No.50-1469 13 over Dr. Summers Bridge in Delaware 14 Canal State Park 225,000 15 (P) Replacement of Bridge No.50-1523 16 over Waste Gate Woodside Avenue in 17 Delaware Canal State Park 100,000 18 (Q) Replacement of Bridge No.50-1594 19 over Mt. Eyre Waste Gate in 20 Delaware Canal State Park 120,000 21 (R) Replacement of Bridge No.50-1609 22 over Mt. Eyre Road Bridge in 23 Delaware Canal State Park 250,000 24 (S) Replacement of Bridge No.50-1634 25 over Milk House Camelback in 26 Delaware Canal State Park 250,000 27 (T) Replacement of Bridge No.50-1668 28 over Goat Farm Bridge in Delaware 29 Canal State Park 250,000 30 (U) Replacement of Bridge No.50-1912 19990S0504B1019 - 611 -
1 over Buckstone Davids Library in 2 Delaware Canal State Park 250,000 3 (V) Replacement of Bridge No.50-2145 4 over Rossiters Bridge in Delaware 5 Canal State Park 250,000 6 (W) Replacement of Bridge No.50-2181 7 over Bowmans Hill Waste Gate in 8 Delaware Canal State Park 200,000 9 (X) Replacement of Bridge No.50-2374 10 over Middle Union Mill Bridge in 11 Delaware Canal State Park 250,000 12 (Y) Replacement of Bridge No.50-2399 13 over Outlet Lock Bridge in Delaware 14 Canal State Park 165,000 15 (Z) Replacement of Bridge No.50-2423 16 over Dark Hollow Run Overflow in 17 Delaware Canal State Park 180,000 18 (AA) Replacement of Bridge No.50-2424 19 over Waste Gate Dark Hollow in 20 Delaware Canal State Park 112,000 21 (BB) Replacement of Bridge No.50-2470 22 over Ferry Street Bridge in 23 Delaware Canal State Park 300,000 24 (CC) Replacement of Bridge No.50-2613 25 over Phillips Mill Bridge in 26 Delaware Canal State Park 250,000 27 (DD) Replacement of Bridge No.50-2682 28 over Lower Limeport Bridge in 29 Delaware Canal State Park 250,000 30 (EE) Replacement of Bridge No.50-2721 19990S0504B1019 - 612 -
1 over Upper Limeport Bridge in 2 Delaware Canal State Park 250,000 3 (FF) Replacement of Bridge No.50-2802 4 over Redfield Bridge in Delaware 5 Canal State Park 250,000 6 (GG) Replacement of Bridge No.50-2896 7 over Virginia Forest in Delaware 8 Canal State Park 250,000 9 (HH) Replacement of Bridge No.50-3047 10 over Waste Gate over Lumberville in 11 Delaware Canal State Park 109,000 12 (II) Replacement of Bridge No.50-3100 13 over Lock 12 Bypass in Delaware 14 Canal State Park 100,000 15 (JJ) Replacement of Bridge No.50-3101 16 over Lumberville Lock 12 in 17 Delaware Canal State Park 150,000 18 (KK) Replacement of Bridge No.50-3206 19 over Waste Gate in Delaware Canal 20 State Park 112,000 21 (LL) Replacement of Bridge No.50-3235 22 over Waste Gate at Lock 13 in 23 Delaware Canal State Park 120,000 24 (MM) Replacement of Bridge No.50-3236 25 over Lock 13 Lock Bridge in 26 Delaware Canal State Park 120,000 27 (NN) Replacement of Bridge No.50-3254 28 over Waste Gate Whites Up Lock in 29 Delaware Canal State Park 125,000 30 (OO) Replacement of Bridge No.50-3394 19990S0504B1019 - 613 -
1 over Smithtown Bridge 2 in Delaware 2 Canal State Park 125,000 3 (PP) Replacement of Bridge No.50-3517 4 over Smithtown Bridge 3 in Delaware 5 Canal State Park 200,000 6 (QQ) Replacement of Bridge NO.50-3557 7 over Waste Gate Kennys Lock in 8 Delaware Canal State Park 160,000 9 (RR) Replacement of Bridge No.50-3587 10 over Smithtown Bridge 5 in Delaware 11 Canal State Park 225,000 12 (SS) Replacement of Bridge No.50-3617 13 over Lock 17 Stop Gate in Delaware 14 Canal State Park 140,000 15 (TT) Replacement of Bridge No.50-3618 16 over Lock 17 Bypass Gate in 17 Delaware Canal State Park 120,000 18 (UU) Replacement of Bridge No.50-3681 19 over Dark Hollow Waste Gate Bridge 20 in Delaware Canal State Park 140,000 21 (VV) Replacement of Bridge No.50-3718 22 over Tinicum Vehicle Bridge in 23 Delaware Canal State Park 160,000 24 (WW) Replacement of Bridge No.50-3736 25 over Overwrekks Waste Gate Bridge 26 in Delaware Canal State Park 140,000 27 (XX) Replacement of Bridge No.50-3925 28 over Dr. Dautzeig Bridge in 29 Delaware Canal State Park 120,000 30 (YY) Replacement of Bridge No.50-3939 19990S0504B1019 - 614 -
1 over Farley Waste Gate in Delaware 2 Canal State Park 100,000 3 (ZZ) Replacement of Bridge No.50-4131 4 over Hazzard Camelback Bridge in 5 Delaware Canal State Park 250,000 6 (AAA) Replacement of Bridge No.50-4182 7 over Lodi Waste Gate Bridge in 8 Delaware Canal State Park 160,000 9 (BBB) Replacement of Bridge No.50-4236 10 over Sphars Camelback Bridge in 11 Delaware Canal State Park 250,000 12 (CCC) Replacement of Bridge No.50-4270 13 over Gottlieb Bridge in Delaware 14 Canal State Park 250,000 15 (DDD) Replacement of Bridge No.50-4300 16 over Dillieo Bridge in Delaware 17 Canal State Park 250,000 18 (EEE) Replacement of Bridge No.50-4488 19 over Clark's Quarry Bridge in 20 Delaware Canal State Park 220,000 21 (FFF) Replacement of Bridge No.50-4565 22 over Overpeck's Bridge in Delaware 23 Canal State Park 250,000 24 (GGG) Replacement of Bridge No.50-4583 25 over Narrowsville Waste Gate in 26 Delaware Canal State Park 130,000 27 (HHH) Replacement of Bridge No.50-4673 28 over Lock 20 Bridge in Delaware 29 Canal State Park 160,000 30 (III) Replacement of Bridge No.50-4787 19990S0504B1019 - 615 -
1 over Nicholas Bridge in Delaware 2 Canal State Park 250,000 3 (JJJ) Replacement of Bridge No.50-4860 4 over Trauger's Steel Camelback in 5 Delaware Canal State Park 250,000 6 (KKK) Replacement of Bridge No.50-4922 7 over Lock 21 Stop Gate in Delaware 8 Canal State Park 140,000 9 (6) Cambria County 10 (A) Replacement of Bridge No.11-1100 11 over Beaver Dam Run (Spillway) in 12 Prince Gallitzin State Park 300,000 13 (7) Cameron County 14 (A) Replacement of Bridge No.23-1303 15 over Norcross Run in Sinnemahoning 16 State Park 135,000 17 (B) Replacement of Bridge No.24-1401 18 over West Cowley Run in Sizerville 19 State Park 120,000 20 (8) Carbon County 21 (A) Replacement of Bridge No.09-0501 22 over Section Bridge in Hickory Run 23 State Park 135,000 24 (B) Replacement of Bridge No.09-0502 25 over Disposal Plant Bridge in 26 Hickory Run State Park 132,000 27 (C) Replacement of Bridge No.09-0503 28 over Boulder Field Road Bridge in 29 Hickory Run State Park 130,000 30 (D) Replacement of Bridge No.09-0504 19990S0504B1019 - 616 -
1 over Swimming Pool Bridge in 2 Hickory Run State Park 136,000 3 (E) Replacement of Bridge No.33-0100 4 over Oldmill Road/Sawmill Run in 5 Beltzville State Park 120,000 6 (F) Replacement of Bridge No.35-1400 7 over Lehigh Gorge State Park in 8 Lehigh Gorge State Park 250,000 9 (9) Centre County 10 (A) Replacement of Bridge No.18-0900 11 over Main Park Road in Poe Valley 12 State Park 224,000 13 (B) Replacement of Bridge No.22-0900 14 over Camping Bridge in Greenwood 15 Furnace State Park 140,000 16 (10) Clearfield County 17 (A) Replacement of Bridge No.17-0801 18 over Campground Road in Parker Dam 19 State Park 220,000 20 (11) Clinton County 21 (A) Replacement of Bridge No.10-0600 22 over Main Park Road Entrance in 23 Hyner Run State Park 240,000 24 (B) Replacement of Bridge No.10-0601 25 over Hyner Run Road in Hyner Run 26 State Park 140,000 27 (12) Crawford County 28 (A) Replacement of Bridge No.26-1102 29 over Dam Overflow Bridge in 30 Pymatuning State Park 1,000,000 19990S0504B1019 - 617 -
1 (B) Replacement of Bridge No.26-1103 2 over Dam Spillway Bridge in 3 Pymatuning State Park 1,539,000 4 (13) Cumberland County 5 (A) Replacement of Bridge No.10-1000 6 over Fuller Lake Dam Breast in Pine 7 Grove Furnace State Park 135,000 8 (14) Delaware County 9 (A) Replacement of Bridge No.27-1100 10 over South of Pa.3 Entrance in 11 Ridley Creek State Park 140,000 12 (B) Replacement of Bridge No.27-1104 13 over Sycamore Mills Road in Park in 14 Ridley Creek State Park 130,000 15 (15) Erie County 16 (A) Replacement of Bridge No.20-1000 17 over Lagoon Bridge in Presque Isle 18 State Park 1,500,000 19 (B) Replacement of Bridge No.20-1101 20 over Misery BSY Bridge in Presque 21 Isle State Park 1,500,000 22 (16) Fayette County 23 (A) Replacement of Bridge No.11-0901 24 over Brunner Run Bridge in Ohiopyle 25 State Park 1,000,000 26 (17) Franklin County 27 (A) Replacement of Bridge No.03-0201 28 over Main Entrance Road in 29 Caledonia State Park 120,000 30 (B) Replacement of Bridge No.03-0202 19990S0504B1019 - 618 -
1 over Main Entrance Road in 2 Caledonia State Park 200,000 3 (C) Replacement of Bridge No.23-0180 4 over End of Main Park Road in 5 Buchanan's Birthplace State Park 175,000 6 (18) Fulton County 7 (A) Replacement of Bridge No.05-0500 8 over Main Park Road in Cowan's Gap 9 State Park 190,000 10 (19) Greene County 11 (A) Replacement of Bridge No.14-1300 12 over Iron Bridge Trail in Ryerson 13 Station State Park 500,000 14 (20) Huntingdon County 15 (A) Replacement of Bridge No.14-1300 16 over Upper Picnic Area in Trough 17 Creek State Park 334,000 18 (21) Luzerne County 19 (A) Replacement of Bridge No.17-1001 20 over Bridge No.2 Kitchen Creek in 21 Ricketts Glen State Park 130,000 22 (22) Lycoming County 23 (A) Replacement of Bridge No.14-0700 24 over Campground Road in Little Pine 25 State Park 424,000 26 (23) Mifflin County 27 (A) Replacement of Bridge No.21-1200 28 over Jack's Mountain Road in Reeds 29 Gap State Park 176,000 30 (B) Replacement of Bridge No.21-1201 19990S0504B1019 - 619 -
1 over Service Road in Reeds Gap 2 State Park 100,000 3 (24) Montgomery County 4 (A) Replacement of Bridge No.34-1601 5 over Driveway in Evansburg State 6 Park 120,000 7 (B) Replacement of Bridge No.34-1602 8 over Service Road Bridge in 9 Evansburg State Park 175,000 10 (C) Replacement of Bridge No.52-1500 11 over High Arch Bridge in Norristown 12 Farm Park 625,000 13 (D) Replacement of Bridge No.52-1501 14 over Meadow Bridge in Norristown 15 Farm Park 500,000 16 (E) Replacement of Bridge No.52-1502 17 over Lower Farm Road Bridge No.2 in 18 Norristown Farm Park 700,000 19 (F) Replacement of Bridge No.52-1503 20 over Lower Farm Road/Piggery Road 21 in Norristown Farm Park 125,000 22 (G) Replacement of Bridge No.52-1504 23 over Lower Farm Road/Stony Road in 24 Norristown Farm Park 1,500,000 25 (H) Replacement of Bridge No.52-1506 26 over Stanbridge Street Extension in 27 Norristown Farm Park 700,000 28 (I) Replacement of Bridge No.52-1507 29 over Small Railroad Bridge in 30 Norristown Farm Park 140,000 19990S0504B1019 - 620 -
1 (25) Northampton County 2 (A) Replacement of Bridge No.07-0000 3 over Henry Homestead Bridge in 4 Jacobsburg E. E. Center 120,000 5 (B) Replacement of Bridge No.50-5135 6 over Rocky Falls Waste Gate in 7 Delaware Canal State Park 120,000 8 (C) Replacement of Bridge No.50-5371 9 over Raubsville P./S. Bridge in 10 Delaware Canal State Park 200,000 11 (D) Replacement of Bridge No.50-5417 12 over Raubsville Camelback Bridge in 13 Delaware Canal State Park 200,000 14 (E) Replacement of Bridge No.50-5472 15 over Browns Terrace Bridge in 16 Delaware Canal State Park 200,000 17 (F) Replacement of Bridge No.50-5657 18 over Stop Gate Bridge 56.570 in 19 Delaware Canal State Park 250,000 20 (G) Replacement of Bridge No.50-5887 21 over Lock 24 East in Delaware Canal 22 State Park 160,000 23 (H) Replacement of Bridge No.50-5888 24 over Lock 24 Bridge in Delaware 25 Canal State Park 160,000 26 (I) Replacement of Bridge No.50-5889 27 over Lock 24 West in Delaware Canal 28 State Park 160,000 29 (26) Perry County 30 (A) Replacement of Bridge No.17-0803 19990S0504B1019 - 621 -
1 over Maintenance Road in Little 2 Buffalo State Park 120,000 3 (27) Pike County 4 (A) Replacement of Bridge No.14-0800 5 over Big Inlet in Promised Land 6 State Park 130,000 7 (B) Replacement of Bridge No.14-0802 8 over Lower Lake Road in Promised 9 Land State Park 1,000,000 10 (28) Somerset County 11 (A) Replacement of Bridge No.06-0400 12 over Main Road Bridge No.1 in 13 Kooser State Park 130,000 14 (B) Replacement of Bridge No.06-0401 15 over Main Road Bridge No.2 in 16 Kooser State Park 130,000 17 (C) Replacement of Bridge No.06-0402 18 over Van Dyke Picnic Area in Kooser 19 State Park 120,000 20 (D) Replacement of Bridge No.07-0503 21 over Main Road Forge Bridge No.1 in 22 Laurel Hill State Park 500,000 23 (E) Replacement of Bridge No.07-0505 24 over Main Road Jones Bridge No.2 in 25 Laurel Hill State Park 300,000 26 (29) Tioga County 27 (A) Replacement of Bridge No.09-0500 28 over Hills Creek Lake in Hills 29 Creek State Park 400,000 30 (30) Union County 19990S0504B1019 - 622 -
1 (A) Replacement of Bridge No.20-1000 2 over Service Road to Beach in R.B. 3 Winter State Park 120,000 4 (31) Westmoreland County 5 (A) Replacement of Bridge No.05-0300 6 over Main Picnic Area in Keystone 7 State Park 100,000 8 (B) Replacement of Bridge No.08-0700 9 over Adams Falls Picnic Area in 10 Linn Run State Park 140,000 11 (C) Replacement of Bridge No.08-0701 12 over Cabins 9 and 10 Access Road in 13 Linn Run State Park 160,000 14 Section 72.3. Statewide bicycle and pedestrian structures. 15 Rehabilitation, construction and demolition of 16 bridges and other crossing structures on bicycle 17 and pedestrian ways to be identified by the 18 Department of Conservation and Natural Resources 5,000,000 19 Section 73. Limitation on expenditure of funds. 20 Any moneys derived from the incurring of debt shall be used 21 solely for effecting the rehabilitation, replacement or removal 22 of bridges located on State highways or State forestry bridges. 23 All other bridge rehabilitation, replacement or removal shall be 24 financed and State bridge or State forestry bridge 25 rehabilitation, replacement or removal may also be financed from 26 current revenue. 27 Section 74. Debt authorization. 28 The Governor, Auditor General and State Treasurer are hereby 29 authorized and directed to borrow from time to time, in addition 30 to any authorization heretofore or hereafter enacted, on the 19990S0504B1019 - 623 -
1 credit of the Commonwealth, subject to the limitations provided 2 in the current capital budget, money not exceeding in the 3 aggregate the sum of $1,485,147,000 $2,092,894,000 as may be <-- 4 found necessary to carry out the acquisition and construction of 5 the State projects specifically itemized in this act. 6 Section 75. Issue of bonds. 7 The indebtedness authorized in this act shall be incurred 8 from time to time and shall be evidenced by one or more series 9 of general obligation bonds of the Commonwealth in such 10 aggregate principal amount for each series as the Governor, 11 Auditor General and State Treasurer shall determine, but the 12 latest stated maturity date shall not exceed 30 years from the 13 date of the bond first issued for each series. 14 Section 76. Estimated useful life of projects. 15 The General Assembly states the estimated useful life of the 16 projects itemized in this act as 30 years. 17 Section 77. Appropriation. 18 The net proceeds of the sale of the obligations authorized in 19 this act are hereby appropriated from the Capital Facilities 20 Fund to the department in the maximum amount of $1,485,147,000 <-- 21 $2,092,894,000 to be used by it exclusively to defray the 22 financial costs of the State projects specifically itemized in 23 this capital budget. After reserving or paying the expenses of 24 the sale of the obligation, the State Treasurer shall pay out to 25 the department the moneys as required and certified by it to be 26 legally due and payable. 27 Section 78. Federal funds. 28 In addition to those funds appropriated in section 77, all 29 moneys received from the Federal Government for the public 30 improvement projects specifically itemized in this act are also 19990S0504B1019 - 624 -
1 hereby appropriated for those projects. 2 Section 79. Allocation of funds. 3 (a) General rule.--Whenever the department or the Department 4 of Conservation and Natural Resources determines that the full 5 estimated financial costs of the projects itemized in this act 6 are not necessary for the proper design, acquisition or 7 construction of such projects, the excess funds no longer 8 required may be allocated by the department or the Department of 9 Conservation and Natural Resources to increase the estimated 10 costs of any one or more of the projects specifically itemized 11 in a capital budget. 12 (b) Reimbursement of municipal expenditures.--Moneys raised 13 or expended by municipalities after the effective date of this 14 act, in anticipation of receipt of funds authorized for projects 15 itemized by this act, may be reimbursable to those 16 municipalities. 17 Section 80. Policy on jobs and materials. 18 (a) Jobs.--It is the declared policy of the Commonwealth 19 that the construction projects authorized in this act be used, 20 to the greatest extent possible, to provide for the creation of 21 jobs and the rehiring of the unemployed in this Commonwealth. In 22 order to reach this goal, firms with Commonwealth-based 23 facilities shall be actively solicited to make bids on contracts 24 to furnish products and materials, including, but not limited 25 to, steel and steel products, to be used in these projects. 26 (b) Materials.--Every contract document entered into to 27 undertake a project contained in this act shall provide that any 28 steel or other products to be used or supplied in the 29 performance of this contract shall be required to be 30 manufactured by plants in the United States unless the secretary 19990S0504B1019 - 625 -
1 determines, on a contract by contract basis, that certain 2 required products are not produced in the United States in 3 sufficient quantities to meet the requirements of the contract. 4 Such a determination and the reasons therefor shall be published 5 in the Pennsylvania Bulletin. Decisions made under this 6 subsection shall not be inconsistent with the general provisions 7 of the act of March 3, 1978 (P.L.6, No.3), known as the Steel 8 Products Procurement Act. 9 (c) Minorities and women.--It is also the declared policy of 10 the Commonwealth to require and encourage substantial 11 participation by minorities and women in the construction 12 projects authorized by this act. 13 Section 81. Payment of capital debt service. 14 The repayment of any debt incurred pursuant to this act shall 15 be made from the account and such repayment shall have first 16 claim on the revenues of the account. 17 Section 82. Authorization and debt cumulation. 18 The additional authorization and debt allowance provided for 19 in this act shall be added to the total authorizations and debt 20 incurred pursuant to the act of December 8, 1982 (P.L.848, 21 No.235), known as the Highway-Railroad and Highway Bridge 22 Capital Budget Act for 1982-1983, as amended and supplemented. 23 Section 83. Editorial changes. 24 In editing and preparing this act for printing following the 25 final enactment, the Legislative Reference Bureau shall insert 26 or revise letters or numbers for projects where the letters or 27 numbers are missing or require revision. The bureau shall also 28 revise the total monetary amounts for the total authorization, 29 debt authorization, appropriations and departmental totals as 30 necessary to agree with the total monetary amounts of the 19990S0504B1019 - 626 -
1 projects.
2 SECTION 84. REPEAL. <--
3 SECTION 3(50)(I)(Q) OF THE ACT OF DECEMBER 8, 1982 (P.L.848,
4 NO.235), KNOWN AS THE HIGHWAY-RAILROAD AND HIGHWAY BRIDGE
5 CAPITAL BUDGET ACT FOR 1982-1983, IS REPEALED.
6 Section 84 85. Effective date. <--
7 This act shall take effect immediately.
B3L86RZ/19990S0504B1019 - 627 -