                                 HOUSE AMENDED
        PRIOR PRINTER'S NOS. 514, 1019                PRINTER'S NO. 1471

THE GENERAL ASSEMBLY OF PENNSYLVANIA


SENATE BILL

No. 504 Session of 1999


        INTRODUCED BY STOUT AND MADIGAN, FEBRUARY 26, 1999

        AS RE-REPORTED FROM COMMITTEE ON APPROPRIATIONS, HOUSE OF
           REPRESENTATIVES, AS AMENDED, NOVEMBER 8, 1999

                                  A SUPPLEMENT

     1  To the act of December 8, 1982 (P.L.848, No.235), entitled "An
     2     act providing for the adoption of capital projects related to
     3     the repair, rehabilitation or replacement of highway bridges
     4     to be financed from current revenue or by the incurring of
     5     debt and capital projects related to highway and safety
     6     improvement projects to be financed from current revenue of
     7     the Motor License Fund," itemizing additional local and State
     8     bridge projects.

     9     The General Assembly of the Commonwealth of Pennsylvania
    10  hereby enacts as follows:
    11  Section 1.  Short title.
    12     This act shall be known and may be cited as the Highway-
    13  Railroad and Highway Bridge Capital Budget Supplemental Act for
    14  1999-2000.
    15  Section 2.  Definitions.
    16     The following words and phrases when used in this act shall
    17  have the meanings given to them in this section unless the
    18  context clearly indicates otherwise:
    19     "Account."  The Highway Bridge Improvement Restricted Account


     1  within the Motor License Fund.
     2     "Capital project."  A capital project as defined in section
     3  1602-B of the act of April 9, 1929 (P.L.343, No.176), known as    <--
     4  The Fiscal Code, 302 OF THE ACT OF FEBRUARY 9, 1999 (P.L.1,       <--
     5  NO.1), KNOWN AS THE CAPITAL FACILITIES DEBT ENABLING ACT, and
     6  shall include a county or municipal bridge rehabilitation,
     7  replacement or improvement project as set forth in this act.
     8     "Department."  The Department of Transportation of the
     9  Commonwealth.
    10     "Secretary."  The Secretary of Transportation of the
    11  Commonwealth.
    12  Section 3.  Total authorization for bridge projects.
    13     (a)  Projects to be financed by the incurring of debt or from  <--
    14  the account.--
    15         (1)  Total projects.--The total authorization for the
    16     (A)  TOTAL PROJECTS.--THE TOTAL AUTHORIZATION FOR THE costs    <--
    17  of the projects itemized pursuant to this act and to be financed
    18  from current revenue or by the incurring of debt shall be
    19  $3,016,159,000 $3,298,575,000.                                    <--
    20         (2)  State projects.--The authorization for capital        <--
    21     (B)  STATE PROJECTS.--THE AUTHORIZATION FOR CAPITAL projects   <--
    22  in the category of highway bridge projects and forestry and
    23  State park bridge projects to be constructed by the Department
    24  of Transportation, its successors or assigns, and to be financed
    25  by the incurring of debt or from the account, itemized in this
    26  act under the category of State bridges, shall be $2,092,894,000  <--
    27  $2,251,049,000.                                                   <--
    28         (3)  Non-State projects.--The authorization for non-State  <--
    29     (C)  NON-STATE PROJECTS.--THE AUTHORIZATION FOR NON-STATE      <--
    30  highway bridge projects to be constructed by municipalities and
    19990S0504B1471                  - 2 -

     1  to be financed in part with grants not exceeding 80% of the non-
     2  Federal share of the costs made to the local government
     3  municipalities by the department from revenues deposited in the
     4  account itemized in this act under the category of local
     5  bridges, shall be $923,265,000 $1,047,526,000.                    <--
     6     (b)  Projects to be financed by oil company franchise tax      <--
     7  revenues.--
     8         (1)  State forestry bridge projects.--The authorization
     9     for capital projects in the category of State forestry bridge
    10     projects to be constructed by the Department of Conservation
    11     and Natural Resources, or its successors or assigns, and to
    12     be financed by oil company franchise tax revenues pursuant to
    13     75 Pa.C.S. § 9502(a)(2)(iv) (relating to imposition of tax),
    14     itemized in this act under the category of State forestry
    15     bridge projects, shall be $29,846,000.
    16         (2)  State park bridge projects.--The authorization for
    17     capital projects in the category of State park bridge
    18     projects to be constructed by the Department of Conservation
    19     and Natural Resources, or its successors or assigns, and to
    20     be financed by oil company franchise tax revenues pursuant to
    21     75 Pa.C.S. § 9502(a)(2)(iv), itemized in this act under the
    22     category of State park bridge projects, shall be $32,591,000.
    23  Section 4.  Itemization of bridge projects.
    24     The individual capital projects in the category of highway
    25  projects to be constructed by the Department of Transportation,
    26  its successors or assigns, and to be financed from current
    27  revenue or by the incurring of debt are hereby itemized,
    28  together with their estimated financial costs, in the following
    29  sections.
    30  Section 5.  Adams County.
    19990S0504B1471                  - 3 -

     1     (a)  Local Bridges
     2         (1)  Cumberland Township, T-338, Herr's
     3             Ridge Road Bridge over Willoughby Run,
     4             Bridge Rehabilitation                         170,000
     5             (Base Construction Allocation -
     6             $100,000)
     7             (Land Allocation - $10,000)
     8             (Design and Contingencies - $60,000)
     9         (2)  Cumberland Township, T-402, Horner
    10             Road Bridge over Marsh Creek, County
    11             Bridge No.111, Bridge Replacement           1,075,000
    12             (Base Construction Allocation -
    13             $725,000)
    14             (Land Allocation - $25,000)
    15             (Design and Contingencies - $325,000)
    16         (3)  Cumberland Township, T-417, Goulden
    17             Road Bridge over Rock Creek, County
    18             Bridge No.123, Bridge Rehabilitation          330,000
    19             (Base Construction Allocation -
    20             $250,000)
    21             (Land Allocation - $5,000)
    22             (Design and Contingencies - $75,000)
    23         (4)  Cumberland and Freedom Townships, T-
    24             509, Sachs Mill Covered Bridge over
    25             Marsh Creek, Pedestrian Bridge, Bridge
    26             Rehabilitation                                749,000
    27             (Base Construction Allocation -
    28             $698,000)
    29             Design and Contingencies - $51,000)
    30         (5)  BUTLER TOWNSHIP, WEST GUERNSEY ROAD                   <--
    19990S0504B1471                  - 4 -

     1             BRIDGE OVER GETTYSBURG RAILROAD,
     2             PEDESTRIAN BRIDGE REPLACEMENT                 460,000
     3             (BASE CONSTRUCTION ALLOCATION -
     4             $400,000)
     5             (LAND ALLOCATION - $10,000)
     6             (DESIGN AND CONTINGENCIES - $50,000)
     7     (b)  State Bridges
     8         (1)  SR 3001, Bridge over Middle Creek,
     9             Freedom Township, Bridge Replacement          876,000
    10             (Base Construction Allocation -
    11             $649,000)
    12             (Land Allocation - $65,000)
    13             (Design and Contingencies - $162,000)
    14         (2)  PA 234, Bridge over Conewago Creek,
    15             Arendtsville Borough, Bridge
    16             Replacement                                 1,089,000
    17             (Base Construction Allocation -
    18             $806,000)
    19             (Land Allocation - $81,000)
    20             (Design and Contingencies - $202,000)
    21         (3)  PA 116, Bridge over White Run,
    22             Arendtsville Borough, Bridge
    23             Replacement                                   602,000
    24             (Base Construction Allocation -
    25             $445,000)
    26             (Land Allocation - $45,000)
    27             (Design and Contingencies - $112,000)
    28         (4)  SR 3001, Bridge over Bermudian Creek,
    29             Huntington Township, Bridge
    30             Replacement                                 1,009,000
    19990S0504B1471                  - 5 -

     1             (Base Construction Allocation -
     2             $747,000)
     3             (Land Allocation - $75,000)
     4             (Design and Contingencies - $187,000)
     5         (5)  PA 116, Bridge over Muddy Creek,
     6             Highland Township, Bridge Replacement         497,000
     7             (Base Construction Allocation -
     8             $368,000)
     9             (Land Allocation - $37,000)
    10             (Design and Contingencies - $92,000)
    11         (6)  PA 94, Bridge over Bermudian Creek,
    12             Latimore Township, Bridge Replacement         550,000
    13             (Base Construction Allocation -
    14             $400,000)
    15             (Land Allocation - $50,000)
    16             (Design and Contingencies - $100,000)
    17  Section 6.  Allegheny County.
    18     (a)  Local Bridges
    19         (1)  Plum Borough, Mary Street Bridge over
    20             Plum Creek, Bridge Replacement                630,000
    21             (Base Construction Allocation -
    22             $400,000)
    23             (Land Allocation - $50,000)
    24             (Design and Contingencies - $180,000)
    25         (2)  City of Pittsburgh, Glenwood Bridge,
    26             Phase II over Monongahela River, Three
    27             Railroads and Carson Street, Bridge
    28             Rehabilitation                              4,180,000
    29             (Base Construction Allocation -
    30             $3,905,000)
    19990S0504B1471                  - 6 -

     1             (Design and Contingencies - $275,000)
     2         (3)  Elizabeth Township, Patterson Road,
     3             Boyd Hollow Bridge, Bridge Replacement        225,000
     4             (Base Construction Allocation -
     5             $180,000)
     6             (Land Allocation - $11,000)
     7             (Design and Contingencies - $34,000)
     8         (4)  Elizabeth Township, Yates Street
     9             Bridge, Bridge Replacement                    198,000
    10             (Base Construction Allocation -
    11             $158,000)
    12             (Land Allocation - $10,000)
    13             (Design and Contingencies - $30,000)
    14         (5)  Shaler Township, South of Martha
    15             Avenue, Anderson Road over Wible Run,
    16             Bridge Replacement                            500,000
    17             (Base Construction Allocation -
    18             $400,000)
    19             (Design and Contingencies - $100,000)
    20         (6)  Baldwin Borough, Old Clairton Road
    21             over CSX Railroad, Bridge
    22             Rehabilitation                                 80,000
    23             (Base Construction Allocation -
    24             $65,000)
    25             (Design and Contingencies - $15,000)
    26         (7)  Ben Avon Borough, Spruce Run Road over
    27             Spruce Run, Bridge Rehabilitation             265,000
    28             (Base Construction Allocation -
    29             $200,000)
    30             (Land Allocation - $5,000)
    19990S0504B1471                  - 7 -

     1             (Design and Contingencies - $60,000)
     2         (8)  City of Pittsburgh, Swinburne Street,
     3             Bridge Painting                             1,530,000
     4             (Base Construction Allocation -
     5             $1,500,000)
     6             (Design and Contingencies - $30,000)
     7         (9)  City of Pittsburgh, Railroad Bridge
     8             (Hot Metal Bridge) at Former LTV Steel
     9             Company over Monongahela River, Bridge
    10             Rehabilitation                             25,000,000
    11             (Base Construction Allocation -
    12             $22,500,000)
    13             (Design and Contingencies - $2,500,000)
    14         (10)  Edgeworth Borough, Beaver Street over
    15             Little Sewickley Creek, Bridge
    16             Replacement                                   358,000
    17             (Base Construction Allocation -
    18             $250,000)
    19             (Land Allocation - $8,000)
    20             (Design and Contingencies - $100,000)
    21         (11)  Forward Township, Pangburn Hollow
    22             Road over Pangburn Run, Bridge
    23             Replacement                                   200,000
    24             (Base Construction Allocation -
    25             $150,000)
    26             (Land Allocation - $10,000)
    27             (Design and Contingencies - $40,000)
    28         (12)  Hampton Township, Duncan Avenue over
    29             Pine Creek, Bridge Replacement                200,000
    30             (Base Construction Allocation -
    19990S0504B1471                  - 8 -

     1             $150,000)
     2             (Land Allocation - $10,000)
     3             (Design and Contingencies - $40,000)
     4         (13)  Harrison Township, Natrona Road over
     5             Small Branch of Allegheny River, Bridge
     6             Rehabilitation                                210,000
     7             (Base Construction Allocation -
     8             $160,000)
     9             (Land Allocation - $10,000)
    10             (Design and Contingencies - $40,000)
    11         (14)  Jefferson Borough, Coal Valley Road
    12             Bridge No.2 over McRoberts Run, Bridge
    13             Rehabilitation                                200,000
    14             (Base Construction Allocation -
    15             $150,000)
    16             (Land Allocation - $10,000)
    17             (Design and Contingencies - $40,000)
    18         (15)  Jefferson Borough, Coal Valley Road
    19             Bridge No.4 over McRoberts Run, Bridge
    20             Rehabilitation                                200,000
    21             (Base Construction Allocation -
    22             $150,000)
    23             (Land Allocation - $10,000)
    24             (Design and Contingencies - $40,000)
    25         (16)  Leetsdale Borough, Beaver Road over
    26             Big Sewickley Creek, Bridge
    27             Replacement                                   420,000
    28             (Base Construction Allocation -
    29             $300,000)
    30             (Land Allocation - $10,000)
    19990S0504B1471                  - 9 -

     1             (Design and Contingencies - $110,000)
     2         (17)  Municipality of Penn Hills, Mt.
     3             Carmel Road over Sandy Creek, Bridge
     4             Replacement                                   230,000
     5             (Base Construction Allocation -
     6             $170,000)
     7             (Land Allocation - $10,000)
     8             (Design and Contingencies - $50,000)
     9         (18)  Municipality of Penn Hills, Lincoln
    10             Road Bridge No.6 over Sandy Creek,
    11             Bridge Replacement                            215,000
    12             (Base Construction Allocation -
    13             $150,000)
    14             (Land Allocation - $5,000)
    15             (Design and Contingencies - $60,000)
    16         (19)  Municipality of Penn Hills, Lincoln
    17             Road Bridge No.12 over Sandy Creek,
    18             Bridge Replacement                            215,000
    19             (Base Construction Allocation -
    20             $150,000)
    21             (Land Allocation - $5,000)
    22             (Design and Contingencies - $60,000)
    23         (20)  Sewickley Heights Borough, Blackburn
    24             Road over Kilbuck Run, Bridge
    25             Rehabilitation                                145,000
    26             (Base Construction Allocation -
    27             $110,000)
    28             (Land Allocation - $5,000)
    29             (Design and Contingencies - $30,000)
    30         (21)  South Park Township, Sleepy Hollow
    19990S0504B1471                 - 10 -

     1             Road over Sleepy Hollow, Bridge
     2             Replacement                                   295,000
     3             (Base Construction Allocation -
     4             $200,000)
     5             (Land Allocation - $5,000)
     6             (Design and Contingencies - $90,000)
     7         (22)  South Park Township, Cochran's Mill
     8             Road over Licks Run, Bridge
     9             Replacement                                   215,000
    10             (Base Construction Allocation -
    11             $150,000)
    12             (Land Allocation - $5,000)
    13             (Design and Contingencies - $60,000)
    14         (23)  Hampton Township, T-357, Bridge over
    15             Gourdhead Run, Bridge Rehabilitation          320,000
    16             (Base Construction Allocation -
    17             $280,000)
    18             (Design and Contingencies - $40,000)
    19         (24)  Hampton Township, T-984, South
    20             Pioneer Road Bridge No.1 over Crouse
    21             Run, Bridge Rehabilitation                    250,000
    22             (Base Construction Allocation -
    23             $210,000)
    24             (Design and Contingencies - $40,000)
    25         (25)  Hampton Township, T-984, South
    26             Pioneer Road Bridge No.2 over Crouse
    27             Run, Bridge Rehabilitation                    250,000
    28             (Base Construction Allocation -
    29             $210,000)
    30             (Design and Contingencies - $40,000)
    19990S0504B1471                 - 11 -

     1         (26)  Marshall Township, T-482, Northgate
     2             Drive Bridge over Brush Creek, Bridge
     3             Replacement                                   320,000
     4             (Base Construction Allocation -
     5             $280,000)
     6             (Land Allocation - $5,000)
     7             (Design and Contingencies - $35,000)
     8         (27)  Town of McCandless, Blazier Drive
     9             Bridge No.1 over Pine Creek, Bridge
    10             Rehabilitation                                 17,000
    11             (Base Construction Allocation -
    12             $15,000)
    13             (Design and Contingencies - $2,000)
    14         (28)  Town of McCandless, Blazier Drive
    15             Bridge No.2 over Pine Creek, Bridge
    16             Rehabilitation                                 28,000
    17             (Base Construction Allocation -
    18             $26,000)
    19             (Design and Contingencies - $2,000)
    20         (29)  Town of McCandless, Blazier Drive
    21             Bridge No.3 over Pine Creek, Bridge
    22             Rehabilitation                                  3,000
    23             (Base Construction Allocation - $2,000)
    24             (Design and Contingencies - $1,000)
    25         (30)  Town of McCandless, Oakridge Drive
    26             over Pine Creek, Bridge Rehabilitation         10,000
    27             (Base Construction Allocation - $8,000)
    28             (Design and Contingencies - $2,000)
    29         (31)  Town of McCandless, Meinert Road over
    30             Pine Creek, Bridge Rehabilitation               3,000
    19990S0504B1471                 - 12 -

     1             (Base Construction Allocation - $2,000)
     2             (Design and Contingencies - $1,000)
     3         (32)  Collier Township, Thom's Run Road-
     4             Oakdale Road No.4 over Thom's Run,
     5             Bridge Replacement                            210,000
     6             (Base Construction Allocation -
     7             $160,000)
     8             (Land Allocation - $10,000)
     9             (Design and Contingencies - $40,000)
    10         (33)  Collier Township, Thom's Run Road-
    11             Oakdale Road No.5 over Thom's Run,
    12             Bridge Replacement                            210,000
    13             (Base Construction Allocation -
    14             $160,000)
    15             (Land Allocation - $10,000)
    16             (Design and Contingencies - $40,000)
    17         (34)  Collier Township, Thom's Run Road-
    18             Oakdale Road No.9 over Thom's Run,
    19             Bridge Replacement                            180,000
    20             (Base Construction Allocation -
    21             $130,000)
    22             (Land Allocation - $10,000)
    23             (Design and Contingencies - $40,000)
    24         (35)  Etna Borough, Dewey Street over
    25             Little Pine Creek, Bridge
    26             Rehabilitation                                 23,000
    27             (Base Construction Allocation -
    28             $20,000)
    29             (Design and Contingencies - $3,000)
    30         (36)  Forward Township, Roberts Hollow Road
    19990S0504B1471                 - 13 -

     1             over Fallen Timber Run, Bridge
     2             Replacement                                   200,000
     3             (Base Construction Allocation -
     4             $160,000)
     5             (Land Allocation - $10,000)
     6             (Design and Contingencies - $30,000)
     7         (37)  Hampton Township, Duncan Avenue over
     8             Stillhouse Run, Bridge Replacement            230,000
     9             (Base Construction Allocation -
    10             $170,000)
    11             (Land Allocation - $10,000)
    12             (Design and Contingencies - $50,000)
    13         (38)  Penn Hills Township, Lincoln Road
    14             over Ryans Run, Bridge Replacement            190,000
    15             (Base Construction Allocation -
    16             $140,000)
    17             (Land Allocation - $10,000)
    18             (Design and Contingencies - $40,000)
    19         (39)  Penns Hills Township, Lincoln Road
    20             over Sandy Creek, Bridge Replacement          195,000
    21             (Base Construction Allocation -
    22             $150,000)
    23             (Land Allocation - $5,000)
    24             (Design and Contingencies - $40,000)
    25         (40)  North Versailles Township, Crooked
    26             Run Road over Crooked Run, Bridge
    27             Replacement                                   170,000
    28             (Base Construction Allocation -
    29             $130,000)
    30             (Land Allocation - $10,000)
    19990S0504B1471                 - 14 -

     1             (Design and Contingencies - $30,000)
     2         (41)  O'Hara Township, Brownhill Road over
     3             Little Pine Creek, Bridge Replacement         275,000
     4             (Base Construction Allocation -
     5             $231,000)
     6             (Design and Contingencies - $44,000)
     7         (42)  Ross Township, Thompson Run Road over
     8             South Branch of Pine Creek, Bridge
     9             Replacement                                   210,000
    10             (Base Construction Allocation -
    11             $160,000)
    12             (Land Allocation - $8,000)
    13             (Design and Contingencies - $42,000)
    14         (43)  Moon Township, T-114, Becks Run Road
    15             over Flaugherty Run, Bridge
    16             Replacement                                   420,000
    17             (Base Construction Allocation -
    18             $350,000)
    19             (Land Allocation - $20,000)
    20             (Design and Contingencies - $50,000)
    21         (44)  Homestead Borough, High Level Bridge,
    22             Bridge Rehabilitation and Upgrade             250,000
    23         (45)  North Braddock Borough, Hawkins
    24             Avenue Bridge, Bridge Rehabilitation          300,000
    25         (46)  Penn Hills Borough, Beechtree Road
    26             Box Culvert Bridge, Bridge
    27             Rehabilitation                                100,000
    28         (47)  Whitaker Borough, Rankin Bridge,
    29             Bridge Rehabilitation                         100,000
    30         (48)  Swissvale Borough, Kenmaur Bridge
    19990S0504B1471                 - 15 -

     1             connecting Swissvale and Rankin, Bridge
     2             Replacement                                   320,000
     3             (Base Construction Allocation -
     4             $270,000)
     5             (Design and Contingencies - $50,000)
     6         (49)  Wilkins Township, Brown Avenue Bridge
     7             over Brown Run, Bridge Replacement            475,000
     8             (Base Construction Allocation -
     9             $380,000)
    10             (Design and Contingencies - $95,000)
    11         (50)  Wilkins Township, Ivy Street Bridge
    12             over Brown Run, Bridge Replacement            268,000
    13             (Base Construction Allocation -
    14             $214,000)
    15             (Design and Contingencies - $54,000)
    16         (51)  Wilkins Township, Baker Street Bridge
    17             over Chalfant Run, Bridge Replacement         205,000
    18             (Base Construction Allocation -
    19             $164,000)
    20             (Design and Contingencies - $41,000)
    21         (52)  Upper St. Clair Township, Walther
    22             Lane Bridge, Bridge Replacement               700,000
    23             (Base Construction Allocation -
    24             $650,000)
    25             (Design and Contingencies - $50,000)
    26         (53)  Green Tree Borough, Trumball Drive
    27             Bridge over Wheeling and Lake Erie
    28             Railroad, Bridge Rehabilitation               575,000
    29             (Base Construction Allocation -
    30             $500,000)
    19990S0504B1471                 - 16 -

     1             (Design and Contingencies - $75,000)
     2         (54)  City of Pittsburgh, Fancourt Street
     3             Bridge, Bridge Replacement                    625,000
     4             (Base Construction Allocation -
     5             $500,000)
     6             (Design and Contingencies - $125,000)
     7         (55)  City of Pittsburgh, Fort Wayne Bridge
     8             over Allegheny River, Bridge
     9             Rehabilitation                            100,000,000
    10             (Base Construction Allocation -
    11             $90,000,000)
    12             (Land Allocation - $1,000,000)
    13             (Design and Contingencies - $9,000,000)
    14         (56)  City of Pittsburgh, Wabash Bridge at
    15             Stanwix Street over Monongahela River,
    16             Bridge Construction                       175,000,000
    17             (Base Construction Allocation -
    18             $150,000,000)
    19             (Land Allocation - $10,000,000)
    20             (Design and Contingencies -
    21             $15,000,000)
    22         (57)  City of Pittsburgh,
    23             Northshore/Central Business District
    24             Bridge over Allegheny River, Bridge
    25             Construction                               65,000,000
    26             (Base Construction Allocation -
    27             $50,000,000)
    28             (Land Allocation - $10,000,000)
    29             (Design and Contingencies - $5,000,000)
    30         (58)  City of Pittsburgh, Airport
    19990S0504B1471                 - 17 -

     1             Busway/HOV Bridge over Ohio River
     2             (Brunot Island), Bridge Construction      185,000,000
     3             (Base Construction Allocation -
     4             $150,000,000)
     5             (Land Allocation - $20,000,000)
     6             (Design and Contingencies -
     7             $15,000,000)
     8         (59)  City of Pittsburgh, South Millvale
     9             Street Bridge over East Busway/Conrail,
    10             Bridge Rehabilitation                       5,000,000
    11             (Base Construction Allocation -
    12             $5,000,000)
    13         (60)  Carnegie Borough, Carnegie Pedestrian
    14             Mall Bridge, Conversion from Pedestrian
    15             Bridge to Vehicular Bridge                    850,000
    16             (Base Construction Allocation -
    17             $850,000)
    18         (61)  Jefferson Borough, State Street
    19             Bridge Reconstruction                         100,000
    20             (Base Construction Allocation -
    21             $100,000)
    22         (62)  CITY OF PITTSBURGH, FORT WAYNE BRIDGE                <--
    23             REHABILITATION AND CONVERSION FOR
    24             L.R.T. VEHICLES                            20,000,000
    25             (BASE CONSTRUCTION ALLOCATION -
    26             $18,000,000)
    27             (DESIGN AND CONTINGENCIES - $2,000,000)
    28         (63)  CITY OF PITTSBURGH, FAN COURT STREET
    29             BRIDGE, BRIDGE RECONSTRUCTION                 650,000
    30             (BASE CONSTRUCTION ALLOCATION -
    19990S0504B1471                 - 18 -

     1             $500,000)
     2             (DESIGN AND CONTINGENCIES - $150,000)
     3         (64)  CITY OF PITTSBURGH, SOUTH MILLVALE
     4             AVENUE BRIDGE, BRIDGE RECONSTRUCTION        5,500,000
     5             (BASE CONSTRUCTION ALLOCATION -
     6             $5,000,000)
     7             (DESIGN AND CONTINGENCIES - $500,000)
     8         (65)  CITY OF PITTSBURGH, WEST OHIO STREET
     9             BRIDGE, BRIDGE RECONSTRUCTION               3,575,000
    10             (BASE CONSTRUCTION ALLOCATION -
    11             $3,250,000)
    12             (DESIGN AND CONTINGENCIES - $325,000)
    13         (66)  CITY OF PITTSBURGH, MCARDLE VIADUCT
    14             NO.1, BRIDGE RECONSTRUCTION                 3,850,000
    15             (BASE CONSTRUCTION ALLOCATION -
    16             $3,500,000)
    17             (DESIGN AND CONTINGENCIES - $350,000)
    18         (67)  CITY OF PITTSBURGH, MCARDLE VIADUCT
    19             NO.2, BRIDGE RECONSTRUCTION                 3,850,000
    20             (BASE CONSTRUCTION ALLOCATION -
    21             $3,500,000)
    22             (DESIGN AND CONTINGENCIES - $350,000)
    23         (68)  CITY OF PITTSBURGH, CARNAHAN ROAD
    24             BRIDGE, BRIDGE RECONSTRUCTION                 428,000
    25             (BASE CONSTRUCTION ALLOCATION -
    26             $345,000)
    27             (DESIGN AND CONTINGENCIES - $83,000)
    28         (69)  CITY OF PITTSBURGH, SECOND AVENUE
    29             BRIDGE, BRIDGE RECONSTRUCTION                 322,000
    30             (BASE CONSTRUCTION ALLOCATION -
    19990S0504B1471                 - 19 -

     1             $322,000)
     2         (70)  CITY OF PITTSBURGH, SOUTH HIGHLAND
     3             AVENUE BRIDGE, BRIDGE RECONSTRUCTION        5,040,000
     4             (BASE CONSTRUCTION ALLOCATION -
     5             $4,600,000)
     6             (DESIGN AND CONTINGENCIES - $440,000)
     7         (71)  SOUTH PARK TOWNSHIP, CATFISH RUN
     8             BRIDGE NO.10, BRIDGE REPLACEMENT              210,000
     9             (BASE CONSTRUCTION ALLOCATION -
    10             $175,000)
    11             (LAND ALLOCATION - $5,000)
    12             (DESIGN AND CONTINGENCIES - $30,000)
    13         (72)  JEFFERSON BOROUGH, MCROBERTS RUN
    14             BRIDGE NO.6, BRIDGE REPLACEMENT               297,000
    15             (BASE CONSTRUCTION ALLOCATION -
    16             $200,000)
    17             (LAND ALLOCATION - $12,000)
    18             (DESIGN AND CONTINGENCIES - $85,000)
    19         (73)  INDIANA TOWNSHIP, CRAWFORD RUN BRIDGE
    20             NO.2, BRIDGE REPLACEMENT                      299,000
    21             (BASE CONSTRUCTION ALLOCATION -
    22             $215,000)
    23             (LAND ALLOCATION - $9,000)
    24             (DESIGN AND CONTINGENCIES - $75,000)
    25         (74)  MONROEVILLE BOROUGH, DIRTY CAMP RUN
    26             BRIDGE NO.9, BRIDGE REPLACEMENT               315,000
    27             (BASE CONSTRUCTION ALLOCATION -
    28             $225,000)
    29             (LAND ALLOCATION - $10,000)
    30             (DESIGN AND CONTINGENCIES - $80,000)
    19990S0504B1471                 - 20 -

     1         (75)  CITY OF MCKEESPORT, LONG RUN BRIDGE
     2             NO.8, BRIDGE REPLACEMENT                      285,000
     3             (BASE CONSTRUCTION ALLOCATION -
     4             $190,000)
     5             (LAND ALLOCATION - $15,000)
     6             (DESIGN AND CONTINGENCIES - $80,000)
     7         (76)  ROSS TOWNSHIP, SOUTH BRANCH PINE
     8             CREEK, BRIDGE NO.10, BRIDGE
     9             REPLACEMENT                                   297,000
    10             (BASE CONSTRUCTION ALLOCATION -
    11             $200,000)
    12             (LAND ALLOCATION - $12,000)
    13             (DESIGN AND CONTINGENCIES - $85,000)
    14         (77)  SEWICKLEY HILLS BOROUGH, KILBUCK RUN
    15             BRIDGE NO.13, BRIDGE REPLACEMENT              405,000
    16             (BASE CONSTRUCTION ALLOCATION -
    17             $300,000)
    18             (LAND ALLOCATION - $15,000)
    19             (DESIGN AND CONTINGENCIES - $90,000)
    20         (78)  LEETSDALE BOROUGH, BEAVER ROAD BRIDGE
    21             NO.1 OVER BIG SEWICKLEY CREEK, BRIDGE
    22             REPLACEMENT                                   420,000
    23             (BASE CONSTRUCTION ALLOCATION -
    24             $300,000)
    25             (LAND ALLOCATION - $10,000)
    26             (DESIGN AND CONTINGENCIES - $110,000)
    27         (79)  EDGEWORTH BOROUGH, BEAVER STREET
    28             BRIDGE NO.1 OVER LITTLE SEWICKLEY
    29             CREEK, BRIDGE REPLACEMENT                     358,000
    30             (BASE CONSTRUCTION ALLOCATION -
    19990S0504B1471                 - 21 -

     1             $250,000)
     2             (LAND ALLOCATION - $8,000)
     3             (DESIGN AND CONTINGENCIES - $100,000)
     4         (80)  SOUTH PARK TOWNSHIP, SLEEPY HOLLOW
     5             ROAD BRIDGE NO.1, BRIDGE REPLACEMENT          295,000
     6             (BASE CONSTRUCTION ALLOCATION -
     7             $200,000)
     8             (LAND ALLOCATION - $5,000)
     9             (DESIGN AND CONTINGENCIES - $90,000)
    10         (81)  PENN HILLS, LINCOLN ROAD BRIDGE NO.6
    11             OVER SANDY CREEK, BRIDGE REPLACEMENT          215,000
    12             (BASE CONSTRUCTION ALLOCATION -
    13             $150,000)
    14             (LAND ALLOCATION - $5,000)
    15             (DESIGN AND CONTINGENCIES - $60,000)
    16         (82)  PENN HILLS, LINCOLN ROAD BRIDGE NO.12
    17             OVER SANDY CREEK, BRIDGE REPLACEMENT          215,000
    18             (BASE CONSTRUCTION ALLOCATION -
    19             $150,000)
    20             (LAND ALLOCATION - $5,000)
    21             (DESIGN AND CONTINGENCIES - $60,000)
    22         (83)  SOUTH PARK TOWNSHIP, COCHRAN'S MILL
    23             ROAD BRIDGE NO.9 OVER LICKS RUN, BRIDGE
    24             REPLACEMENT                                   215,000
    25             (BASE CONSTRUCTION ALLOCATION -
    26             $150,000)
    27             (LAND ALLOCATION - $5,000)
    28             (DESIGN AND CONTINGENCIES - $60,000)
    29         (84)  FORWARD TOWNSHIP, PANGBURN HOLLOW
    30             ROAD BRIDGE NO.10 OVER PANGBURN RUN,
    19990S0504B1471                 - 22 -

     1             BRIDGE REPLACEMENT                            200,000
     2             (BASE CONSTRUCTION ALLOCATION -
     3             $150,000)
     4             (LAND ALLOCATION - $10,000)
     5             (DESIGN AND CONTINGENCIES - $40,000)
     6         (85)  HAMPTON TOWNSHIP, DUNCAN AVENUE
     7             BRIDGE NO.29 OVER PINE CREEK, BRIDGE
     8             REPLACEMENT                                   200,000
     9             (BASE CONSTRUCTION ALLOCATION -
    10             $150,000)
    11             (LAND ALLOCATION - $10,000)
    12             (DESIGN AND CONTINGENCIES - $40,000)
    13         (86)  ROSS TOWNSHIP, THOMPSON RUN ROAD
    14             BRIDGE NO.7 OVER PINE CREEK, BRIDGE
    15             REPLACEMENT                                   210,000
    16             (BASE CONSTRUCTION ALLOCATION -
    17             $160,000)
    18             (LAND ALLOCATION - $8,000)
    19             (DESIGN AND CONTINGENCIES - $42,000)
    20         (87)  PENN HILLS, LINCOLN ROAD BRIDGE NO.5
    21             OVER RYAN'S RUN, BRIDGE REPLACEMENT           190,000
    22             (BASE CONSTRUCTION ALLOCATION -
    23             $140,000)
    24             (LAND ALLOCATION - $10,000)
    25             (DESIGN AND CONTINGENCIES - $40,000)
    26         (88)  PENN HILLS, LINCOLN ROAD BRIDGE NO.7
    27             OVER SANDY CREEK, BRIDGE REPLACEMENT          195,000
    28             (BASE CONSTRUCTION ALLOCATION -
    29             $150,000)
    30             (LAND ALLOCATION - $5,000)
    19990S0504B1471                 - 23 -

     1             (DESIGN AND CONTINGENCIES - $40,000)
     2         (89)  HAMPTON TOWNSHIP, DUNCAN AVENUE
     3             BRIDGE NO.1 OVER STILLHOUSE RUN, BRIDGE
     4             REPLACEMENT                                   230,000
     5             (BASE CONSTRUCTION ALLOCATION -
     6             $170,000)
     7             (LAND ALLOCATION - $10,000)
     8             (DESIGN AND CONTINGENCIES - $50,000)
     9         (90)  COLLIER TOWNSHIP, THOM'S RUN BRIDGE
    10             NO.4, BRIDGE REPLACEMENT                      210,000
    11             (BASE CONSTRUCTION ALLOCATION -
    12             $160,000)
    13             (LAND ALLOCATION - $10,000)
    14             (DESIGN AND CONTINGENCIES - $40,000)
    15         (91)  COLLIER TOWNSHIP, THOM'S RUN BRIDGE
    16             NO.5, BRIDGE REPLACEMENT                      210,000
    17             (BASE CONSTRUCTION ALLOCATION -
    18             $160,000)
    19             (LAND ALLOCATION - $10,000)
    20             (DESIGN AND CONTINGENCIES - $40,000)
    21         (92)  COLLIER TOWNSHIP, THOM'S RUN BRIDGE
    22             NO.9, BRIDGE REPLACEMENT                      180,000
    23             (BASE CONSTRUCTION ALLOCATION -
    24             $130,000)
    25             (LAND ALLOCATION - $10,000)
    26             (DESIGN AND CONTINGENCIES - $30,000)
    27         (93)  NORTH VERSAILLES TOWNSHIP, CROOKED
    28             RUN BRIDGE NO.3, BRIDGE REPLACEMENT           170,000
    29             (BASE CONSTRUCTION ALLOCATION -
    30             $130,000)
    19990S0504B1471                 - 24 -

     1             (LAND ALLOCATION - $10,000)
     2             (DESIGN AND CONTINGENCIES - $30,000)
     3         (94)  FORWARD TOWNSHIP, ROBERTS HOLLOW ROAD
     4             BRIDGE NO.5 OVER FALLEN TIMBER RUN,
     5             BRIDGE REPLACEMENT                            200,000
     6             (BASE CONSTRUCTION ALLOCATION -
     7             $160,000)
     8             (LAND ALLOCATION - $10,000)
     9             (DESIGN AND CONTINGENCIES - $30,000)
    10         (95)  SEWICKLEY HEIGHTS BOROUGH, BLACKBURN
    11             ROAD BRIDGE NO.16 OVER KILBUCK RUN,
    12             BRIDGE REPLACEMENT                            145,000
    13             (BASE CONSTRUCTION ALLOCATION -
    14             $110,000)
    15             (LAND ALLOCATION - $5,000)
    16             (DESIGN AND CONTINGENCIES - $30,000)
    17         (96)  JEFFERSON BOROUGH, COAL VALLEY ROAD
    18             BRIDGE NO.2 OVER MCROBERTS RUN, BRIDGE
    19             REPLACEMENT                                   200,000
    20             (BASE CONSTRUCTION ALLOCATION -
    21             $150,000)
    22             (LAND ALLOCATION - $10,000)
    23             (DESIGN AND CONTINGENCIES - $40,000)
    24         (97)  JEFFERSON BOROUGH, COAL VALLEY ROAD
    25             BRIDGE NO.4 OVER MCROBERTS RUN, BRIDGE
    26             REPLACEMENT                                   200,000
    27             (BASE CONSTRUCTION ALLOCATION -
    28             $150,000)
    29             (LAND ALLOCATION - $10,000)
    30             (DESIGN AND CONTINGENCIES - $40,000)
    19990S0504B1471                 - 25 -

     1         (98)  PENN HILLS, MT. CARMEL ROAD BRIDGE
     2             NO.14 OVER SANDY CREEK, BRIDGE
     3             REPLACEMENT                                   230,000
     4             (BASE CONSTRUCTION ALLOCATION -
     5             $170,000)
     6             (LAND ALLOCATION - $10,000)
     7             (DESIGN AND CONTINGENCIES - $50,000)
     8         (99)  HARRISON TOWNSHIP, NATRONA ROAD
     9             BRIDGE NO.12 OVER SMALL BRANCH OF
    10             ALLEGHENY RIVER, BRIDGE REPLACEMENT           210,000
    11             (BASE CONSTRUCTION ALLOCATION -
    12             $160,000)
    13             (LAND ALLOCATION - $10,000)
    14             (DESIGN AND CONTINGENCIES - $40,000)
    15         (100)  BOROUGH OF RANKIN AND BOROUGH OF
    16             WHITAKER, RANKIN HOT METAL BRIDGE OVER
    17             THE MONONGAHELA RIVER, BRIDGE
    18             REHABILITATION                              2,550,000
    19             (BASE CONSTRUCTION ALLOCATION -
    20             $2,050,000)
    21             (DESIGN AND CONTINGENCIES - $500,000)
    22         (101)  SOUTH FAYETTE TOWNSHIP, MILLERS RUN,
    23             W&LE RAILROAD OVERPASS, BRIDGE
    24             REHABILITATION                                350,000
    25             (BASE CONSTRUCTION ALLOCATION -
    26             $330,000)
    27             (DESIGN AND CONTINGENCIES - $20,000)
    28         (102)  JEFFERSON TOWNSHIP, W&LE RAILROAD
    29             BRIDGE OVER PETER CREEK ROAD,
    30             REHABILITATE AND REBUILD W&LE, CLAIRTON
    19990S0504B1471                 - 26 -

     1             BRANCH BRIDGE                                 380,000
     2             (BASE CONSTRUCTION ALLOCATION -
     3             $345,000)
     4             (DESIGN AND CONTINGENCIES - $35,000)
     5         (103)  ROBINSON TOWNSHIP, STEUBENVILLE PIKE
     6             BRIDGE OVER CHARTIERS CREEK, BRIDGE
     7             REPLACEMENT                                    85,000
     8         (104)  NORTH FAYETTE TOWNSHIP, NOBLESTOWN
     9             ROAD, BRIDGE OVER ROBINSON RUN,
    10             SUPERSTRUCTURE REPLACEMENT                     75,000
    11         (105)  FINDLAY TOWNSHIP, SANTIAGO ROAD
    12             BRIDGE OVER MONTOUR RUN, REPLACE SUPER
    13             AND REPAIR SUB                                 50,000
    14         (106)  FINDLAY TOWNSHIP, POTATO GARDEN ROAD
    15             BRIDGE OVER POTATO GARDEN ROAD, REPLACE
    16             STRUCTURE AND WIDEN                            75,000
    17         (107)  NORTH FAYETTE TOWNSHIP, NORTH BRANCH
    18             ROAD BRIDGE NO.1 OVER ROBINSON RUN,
    19             STRUCTURE REPLACEMENT                          93,000
    20         (108)  NORTH FAYETTE TOWNSHIP, NORTH BRANCH
    21             ROAD BRIDGE NO.2 OVER ROBINSON RUN,
    22             REPLACE SUPER AND REPAIR SUB                   94,000
    23         (109)  ECONOMY BOROUGH, BIG SEWICKLEY CREEK
    24             ROAD BRIDGE OVER BIG SEWICKLEY CREEK,
    25             BRIDGE REHABILITATION                          19,000
    26         (110)  SEWICKLEY BOROUGH, BRIDGE OVER OHIO
    27             RIVER, BRIDGE PAINTING                        701,000
    28         (111)  CITY OF PITTSBURGH, BRIDGE OVER OHIO
    29             RIVER, BRIDGE PAINTING                      1,101,000
    30         (112)  MOON TOWNSHIP, BEAVER GRADE ROAD
    19990S0504B1471                 - 27 -

     1             BRIDGE OVER MONTOUR RUN, DECK
     2             REPLACEMENT SUPER/SUB REPAIRS                 457,000
     3     (b)  State Bridges
     4         (1)  SR 0028, Etna Bridge, Northbound
     5             Bridge No.4 to Existing SR 0028, Etna
     6             Borough, Shaler Township, Sharpsburg
     7             Borough and O'Hara Township, Bridge
     8             Rehabilitation                              7,415,000
     9             (Base Construction Allocation -
    10             $7,115,000)
    11             (Land Allocation - $300,000)
    12         (2)  SR 0028, Etna Bridge to 62nd Street
    13             Bridge, Etna Borough, Shaler Township,
    14             Sharpsburg Borough and O'Hara Township,
    15             Bridge Rehabilitation                      17,222,000
    16             (Base Construction Allocation -
    17             $17,022,000)
    18             (Land Allocation - $200,000)
    19         (3)  SR 0030, Ardmore Westbound Electric
    20             over SR 2112, Chalfant Borough, Bridge
    21             Replacement                                 3,100,000
    22             (Base Construction Allocation -
    23             $3,000,000)
    24             (Design and Contingencies - $100,000)
    25         (4)  SR 0030, Ardmore Eastbound Electric
    26             over SR 2112, Chalfant Borough, Bridge
    27             Replacement                                 2,500,000
    28             (Base Construction Allocation -
    29             $2,400,000)
    30             (Design and Contingencies - $100,000)
    19990S0504B1471                 - 28 -

     1         (5)  SR 0030, Ardmore Boulevard Bridge No.1
     2             over Falls Run, North of SR 8012
     3             Interchange, Forest Hills Borough,
     4             Bridge Replacement                            550,000
     5             (Base Construction Allocation -
     6             $400,000)
     7             (Land Allocation - $50,000)
     8             (Design and Contingencies - $100,000)
     9         (6)  SR 0048, Boston Hollow Road Bridge
    10             over Unnamed Stream, North of Lincoln
    11             Borough, Elizabeth Borough, Bridge
    12             Replacement                                   340,000
    13             (Base Construction Allocation -
    14             $200,000)
    15             (Land Allocation - $40,000)
    16             (Design and Contingencies - $100,000)
    17         (7)  SR 0050, Bridge over Chartiers Creek,
    18             Northbound Lane, Heidelberg Borough,
    19             Scott Township, Bridge Rehabilitation       3,750,000
    20             (Base Construction Allocation -
    21             $3,300,000)
    22             (Land Allocation - $50,000)
    23             (Design and Contingencies - $400,000)
    24         (8)  SR 0060, South Main Street Bridge over
    25             Saw Mill Run, South of West End Circle,
    26             City of Pittsburgh, Bridge Painting           178,000
    27             (Base Construction Allocation -
    28             $173,000)
    29             (Design and Contingencies - $5,000)
    30         (9)  SR 0130, Tri-Borough Extended Bridge
    19990S0504B1471                 - 29 -

     1             over Patton Street at SR 8076
     2             Interchange, Wilmerding Borough, Bridge
     3             Rehabilitation                                505,000
     4             (Base Construction Allocation -
     5             $400,000)
     6             (Land Allocation - $30,000)
     7             (Design and Contingencies - $75,000)
     8         (10)  SR 0148, Bridge over Crooked Run
     9             Creek near SR 2037, White Oak Borough,
    10             Bridge Replacement                            350,000
    11             (Base Construction Allocation -
    12             $200,000)
    13             (Land Allocation - $50,000)
    14             (Design and Contingencies - $100,000)
    15         (11)  SR 0791, Bridge over Chalfont Run at
    16             SR 2048, Wilkins Township, Bridge
    17             Replacement                                   450,000
    18             (Base Construction Allocation -
    19             $300,000)
    20             (Land Allocation - $50,000)
    21             (Design and Contingencies - $100,000)
    22         (12)  SR 0837, Northbound Ramp A to SR 0885
    23             Southbound, City of Pittsburgh, Bridge
    24             Rehabilitation                              1,350,000
    25             (Base Construction Allocation -
    26             $1,250,000)
    27             (Design and Contingencies - $100,000)
    28         (13)  SR 0978, Miller's Run Road Bridge
    29             over Dolphin Run, South Fayette
    30             Township, Bridge Replacement                  300,000
    19990S0504B1471                 - 30 -

     1             (Base Construction Allocation -
     2             $200,000)
     3             (Design and Contingencies - $100,000)
     4         (14)  SR 1001, West 7th Avenue Bridge over
     5             Bull Creek, Tarentum Borough, Bridge
     6             Replacement                                   400,000
     7             (Base Construction Allocation -
     8             $300,000)
     9             (Design and Contingencies - $100,000)
    10         (15)  SR 1011, Guys Run Road Bridge over
    11             Guys Run, North of SR 0028, Harmar
    12             Township, Bridge Replacement                  350,000
    13             (Base Construction Allocation -
    14             $200,000)
    15             (Land Allocation - $50,000)
    16             (Design and Contingencies - $100,000)
    17         (16)  SR 2001, Glassport-Elizabeth Road
    18             Bridge over Burns Run, North of
    19             Elizabeth Township, Lincoln Borough,
    20             Bridge Replacement                            350,000
    21             (Base Construction Allocation -
    22             $200,000)
    23             (Land Allocation - $50,000)
    24             (Design and Contingencies - $100,000)
    25         (17)  SR 2081, Turtle Creek-Monroeville
    26             Road over US 22 Business, Monroeville
    27             Borough, Bridge Replacement                 1,060,000
    28             (Base Construction Allocation -
    29             $960,000)
    30             (Design and Contingencies - $100,000)
    19990S0504B1471                 - 31 -

     1         (18)  SR 2094, Jerome Street Bridge over SR
     2             2027, Youghiogheny River, McKeesport
     3             Borough, Bridge Rehabilitation              4,600,000
     4             (Base Construction Allocation -
     5             $4,500,000)
     6             (Design and Contingencies - $100,000)
     7         (19)  SR 3066, Steubenville Pike Bridge
     8             over US 22, North Fayette Township,
     9             Bridge Rehabilitation                         500,000
    10             (Base Construction Allocation -
    11             $400,000)
    12             (Land Allocation - $25,000)
    13             (Design and Contingencies - $75,000)
    14         (20)  SR 3069, Liberty Tunnel Airshaft
    15             between SR 0051 and Liberty Bridge,
    16             City of Pittsburgh, Airshaft
    17             Restoration                                 1,570,000
    18             (Base Construction Allocation -
    19             $1,370,000)
    20             (Design and Contingencies - $200,000)
    21         (21)  SR 3104, McKees Rocks Sidewalk over
    22             Harriet Street, McKees Rocks Borough,
    23             Bridge Rehabilitation                       6,800,000
    24             (Base Construction Allocation -
    25             $6,700,000)
    26             (Design and Contingencies - $100,000)
    27         (22)  SR 4036, Big Sewickley Creek Road
    28             over Big Sewickley Creek at SR 2003,
    29             Bell Acres Borough, Bridge
    30             Rehabilitation                                500,000
    19990S0504B1471                 - 32 -

     1             (Base Construction Allocation -
     2             $400,000)
     3             (Land Allocation - $25,000)
     4             (Design and Contingencies - $75,000)
     5         (23)  SR 8043, Southbound Ramp Bridge over
     6             SR 0019 and SR 0065, City of
     7             Pittsburgh, Bridge Rehabilitation           2,400,000
     8             (Base Construction Allocation -
     9             $2,100,000)
    10             (Land Allocation - $50,000)
    11             (Design and Contingencies - $250,000)
    12         (24)  SR 8045, Ramp at Stadium over SR 0065
    13             and Stadium Drive, City of Pittsburgh,
    14             Bridge Rehabilitation                         600,000
    15             (Base Construction Allocation -
    16             $600,000)
    17         (25)  SR 8049, SR 0019 Bridge Ramp, Chateau
    18             Street to SR 0019, City of Pittsburgh,
    19             Bridge Rehabilitation                       2,350,000
    20             (Base Construction Allocation -
    21             $2,000,000)
    22             (Land Allocation - $50,000)
    23             (Design and Contingencies - $300,000)
    24         (26)  SR 8049, Bridge Ramp from SR 0065
    25             Northbound to SR 0019, City of
    26             Pittsburgh, Bridge Rehabilitation           2,850,000
    27             (Base Construction Allocation -
    28             $2,500,000)
    29             (Land Allocation - $50,000)
    30             (Design and Contingencies - $300,000)
    19990S0504B1471                 - 33 -

     1         (27)  SR 8049, I-279 Bridge Ramp to SR 0065
     2             Northbound, City of Pittsburgh, Bridge
     3             Rehabilitation                              1,730,000
     4             (Base Construction Allocation -
     5             $1,500,000)
     6             (Land Allocation - $30,000)
     7             (Design and Contingencies - $200,000)
     8         (28)  SR 0030, Ardmore Boulevard Bridge
     9             No.2 over Falls Run, North of SR 8012
    10             Interchange, Forest Hills Borough,
    11             Bridge Replacement                            550,000
    12             (Base Construction Allocation -
    13             $400,000)
    14             (Land Allocation - $50,000)
    15             (Design and Contingencies - $100,000)
    16         (29)  SR 3004, McLaughlin Road Bridge over
    17             McLaughlin Run, Bridgeville Borough,
    18             Bridge Replacement                            227,000
    19             (Base Construction Allocation -
    20             $177,000)
    21             (Land Allocation - $10,000)
    22             (Design and Contingencies - $40,000)
    23         (30)  SR 0028, Northbound Bridge over
    24             Pennsylvania Turnpike, Harmar Township,
    25             Bridge Rehabilitation                         344,000
    26             (Base Construction Allocation -
    27             $314,000)
    28             (Design and Contingencies - $30,000)
    29         (31)  SR 0028, Southbound Bridge over
    30             Pennsylvania Turnpike, Harmar Township,
    19990S0504B1471                 - 34 -

     1             Bridge Rehabilitation                         356,000
     2             (Base Construction Allocation -
     3             $325,000)
     4             (Design and Contingencies - $31,000)
     5         (32)  SR 0028, Northbound Bridge over SR
     6             1028, Harrison Township, Bridge
     7             Rehabilitation                                106,000
     8             (Base Construction Allocation -
     9             $97,000)
    10             (Design and Contingencies - $9,000)
    11         (33)  SR 0028, Southbound Bridge over SR
    12             1028, Harrison Township, Bridge
    13             Rehabilitation                                105,000
    14             (Base Construction Allocation -
    15             $96,000)
    16             (Design and Contingencies - $9,000)
    17         (34)  SR 0050, Washington Avenue Bridge
    18             over Chartiers Creek, Bridgeville
    19             Borough, Bridge Rehabilitation                119,000
    20             (Base Construction Allocation -
    21             $109,000)
    22             (Design and Contingencies - $10,000)
    23         (35)  SR 0051, Clairton Boulevard Bridge
    24             over Lewis Run, Pleasant Hills Borough,
    25             Bridge Replacement                            600,000
    26             (Base Construction Allocation -
    27             $500,000)
    28             (Design and Contingencies - $100,000)
    29         (36)  SR 0065, Ohio River Boulevard Bridge
    30             over Forest Avenue, Ben Avon Borough,
    19990S0504B1471                 - 35 -

     1             Bridge Replacement                            396,000
     2             (Base Construction Allocation -
     3             $360,000)
     4             (Design and Contingencies - $36,000)
     5         (37)  SR 0065, Bridge over Ramps, Railroad
     6             and Chateau Street, City of Pittsburgh,
     7             Bridge Rehabilitation                      13,284,000
     8             (Base Construction Allocation -
     9             $12,784,000)
    10             (Design and Contingencies - $500,000)
    11         (38)  SR 0079, Neville Island Bridge over
    12             Ohio River, Neville Township, Bridge
    13             Rehabilitation                             12,700,000
    14             (Base Construction Allocation -
    15             $11,200,000)
    16             (Design and Contingencies - $1,500,000)
    17         (39)  SR 0088, Library Road Bridge No.1
    18             over Piney Fork Creek, Bethel Park
    19             Borough, Bridge Replacement                   161,000
    20             (Base Construction Allocation -
    21             $128,000)
    22             (Land Allocation - $20,000)
    23             (Design and Contingencies - $13,000)
    24         (40)  SR 0088, Library Road Bridge No.2
    25             over Branch of Piney Fork Creek, Bethel
    26             Park Borough, Bridge Replacement              161,000
    27             (Base Construction Allocation -
    28             $128,000)
    29             (Land Allocation - $20,000)
    30             (Design and Contingencies - $13,000)
    19990S0504B1471                 - 36 -

     1         (41)  SR 0885, Mifflin Road Bridge over
     2             Branch of Streets Run, City of
     3             Pittsburgh, Bridge Replacement                600,000
     4             (Base Construction Allocation -
     5             $500,000)
     6             (Design and Contingencies - $100,000)
     7         (42)  SR 0910, Gibsonia Road Bridge over
     8             Rawlins Run, Indiana Township, Bridge
     9             Deck Replacement                              132,000
    10             (Base Construction Allocation -
    11             $120,000)
    12             (Design and Contingencies - $12,000)
    13         (43)  SR 1027, Pleasantville Road Bridge
    14             over Little Bull Creek, Harrison
    15             Township, Bridge Replacement                  400,000
    16             (Base Construction Allocation -
    17             $300,000)
    18             (Design and Contingencies - $100,000)
    19         (44)  SR 1032, Burtner Road Bridge over
    20             Little Bull Creek, Harrison Township,
    21             Bridge Deck Replacement                       198,000
    22             (Base Construction Allocation -
    23             $180,000)
    24             (Design and Contingencies - $18,000)
    25         (45)  SR 2008, Lovedale Road Bridge over
    26             Wylie Run Creek, Elizabeth Township,
    27             Bridge Replacement                            430,000
    28             (Base Construction Allocation -
    29             $300,000)
    30             (Land Allocation - $30,000)
    19990S0504B1471                 - 37 -

     1             (Design and Contingencies - $100,000)
     2         (46)  SR 2017, Pineview Drive Bridge No.1
     3             over Gillespie Run, Elizabeth Township,
     4             Bridge Deck Replacement                       255,000
     5             (Base Construction Allocation -
     6             $135,000)
     7             (Land Allocation - $20,000)
     8             (Design and Contingencies - $100,000)
     9         (47)  SR 2017, Pineview Drive Bridge No.2
    10             over Gillespie Run, Elizabeth Township,
    11             Bridge Deck Replacement                       243,000
    12             (Base Construction Allocation -
    13             $123,000)
    14             (Land Allocation - $20,000)
    15             (Design and Contingencies - $100,000)
    16         (48)  SR 2018, West Smithfield Road Bridge
    17             over Unnamed Creek, Elizabeth Township,
    18             Bridge Deck Replacement                       218,000
    19             (Base Construction Allocation -
    20             $118,000)
    21             (Design and Contingencies - $100,000)
    22         (49)  SR 2031, Lincoln Way Bridge over Long
    23             Run, White Oak Borough, Bridge
    24             Replacement                                   600,000
    25             (Base Construction Allocation -
    26             $500,000)
    27             (Design and Contingencies - $100,000)
    28         (50)  SR 2051, Brinton Road Bridge over I-
    29             376, Edgewood Borough, Bridge
    30             Rehabilitation                                996,000
    19990S0504B1471                 - 38 -

     1             (Base Construction Allocation -
     2             $846,000)
     3             (Design and Contingencies - $150,000)
     4         (51)  SR 4019, Mount Royal Boulevard Bridge
     5             over Pine Creek, Hampton Township,
     6             Bridge Rehabilitation                          94,000
     7             (Base Construction Allocation -
     8             $89,000)
     9             (Design and Contingencies - $5,000)
    10         (52)  SR 4043, Big Sewickley Road Bridge
    11             over Branch of Big Sewickley Creek,
    12             Franklin Park Borough, Bridge
    13             Replacement                                    84,000
    14             (Base Construction Allocation -
    15             $76,000)
    16             (Design and Contingencies - $8,000)
    17         (53)  SR 8002, Crosstown Boulevard Bridge
    18             over Forbes and Diamond Street and
    19             Ramps, City of Pittsburgh, Bridge
    20             Painting                                      310,000
    21             (Base Construction Allocation -
    22             $300,000)
    23             (Design and Contingencies - $10,000)
    24         (54)  SR 8002, Ramp L Road Bridge over
    25             Forbes and Diamond Streets, City of
    26             Pittsburgh, Bridge Painting                   110,000
    27             (Base Construction Allocation -
    28             $100,000)
    29             (Design and Contingencies - $10,000)
    30         (55)  SR 8015, Ramp D Road Bridge over Ohio
    19990S0504B1471                 - 39 -

     1             River Back Channel, Neville Township,
     2             Bridge Rehabilitation                         800,000
     3             (Base Construction Allocation -
     4             $700,000)
     5             (Design and Contingencies - $100,000)
     6         (56)  SR 8015, Ramp E Road Bridge over PC&Y
     7             Railroad, Neville Township, Bridge
     8             Rehabilitation                                670,000
     9             (Base Construction Allocation -
    10             $500,000)
    11             (Design and Contingencies - $170,000)
    12         (57)  SR 8015, I-79 Ramp H Bridge over PC&Y
    13             Railroad, Neville Township, Bridge
    14             Rehabilitation                                700,000
    15             (Base Construction Allocation -
    16             $600,000)
    17             (Design and Contingencies - $100,000)
    18         (58)  SR 8015, Ramp J Road Bridge over
    19             Neville Road, Neville Township, Bridge
    20             Rehabilitation                                220,000
    21             (Base Construction Allocation -
    22             $200,000)
    23             (Design and Contingencies - $20,000)
    24         (59)  SR 8017, Ramp B2 Road Bridge over SR
    25             4025 and SR 4033, Glenfield Borough,
    26             Bridge Rehabilitation                         110,000
    27             (Base Construction Allocation -
    28             $100,000)
    29             (Design and Contingencies - $10,000)
    30         (60)  SR 8017, Ramp B Road Bridge over Ramp
    19990S0504B1471                 - 40 -

     1             A and SR 4033, Glenfield Borough,
     2             Bridge Rehabilitation                         120,000
     3             (Base Construction Allocation -
     4             $110,000)
     5             (Design and Contingencies - $10,000)
     6         (61)  SR 8017, Ramp B1 Road Bridge over SR
     7             0065 Ramps A1 and R, Glenfield Borough,
     8             Bridge Rehabilitation                         165,000
     9             (Base Construction Allocation -
    10             $150,000)
    11             (Design and Contingencies - $15,000)
    12         (62)  SR 8017, Ramp A Road Bridge over Ramp
    13             B3, Glenfield Borough, Bridge
    14             Rehabilitation                                110,000
    15             (Base Construction Allocation -
    16             $100,000)
    17             (Design and Contingencies - $10,000)
    18         (63)  SR 0028, Etna Bridges, Phase III,
    19             Northbound Bridge No.4 to Existing SR
    20             0028, Two Structures, Etna and
    21             Sharpsburg Boroughs, Bridge
    22             Rehabilitation                              6,300,000
    23             (Base Construction Allocation -
    24             $6,000,000)
    25             (Land Allocation - $300,000)
    26         (64)  SR 0028, Etna Bridge, Phase II,
    27             Southbound Bridge No.3 and Northbound
    28             Bridge for SR 0008 Connection, Etna and
    29             Sharpsburg Boroughs and Shaler
    30             Township, Bridge Rehabilitation            13,200,000
    19990S0504B1471                 - 41 -

     1             (Base Construction Allocation -
     2             $12,200,000)
     3             (Land Allocation - $1,000,000)
     4         (65)  SR 2013, Monessen-Elizabeth Road
     5             Bridge over Becketts Run, Forward
     6             Township, Bridge Replacement                  450,000
     7             (Base Construction Allocation -
     8             $300,000)
     9             (Land Allocation - $50,000)
    10             (Design and Contingencies - $100,000)
    11         (66)  SR 2016, Jefferson Heights Road
    12             Bridge over I-376, Wilkins Township,
    13             Bridge Reconstruction                       1,600,000
    14             (Base Construction Allocation -
    15             $1,200,000)
    16             (Design and Contingencies - $400,000)
    17         (67)  SR 0008, Bridge over Allegheny River
    18             and Conrail, City of Pittsburgh, Bridge
    19             Painting                                      333,000
    20             (Base Construction Allocation -
    21             $333,000)
    22         (68)  SR 0028, Allegheny Valley Expressway
    23             Bridge, Southbound over Burtner Road,
    24             Harrison Township, Bridge
    25             Rehabilitation                                170,000
    26             (Base Construction Allocation -
    27             $165,000)
    28             (Design and Contingencies - $5,000)
    29         (69)  SR 0028, Allegheny Valley Expressway
    30             Bridge, Northbound over Burtner Road,
    19990S0504B1471                 - 42 -

     1             Harrison Township, Bridge
     2             Rehabilitation                                320,000
     3             (Base Construction Allocation -
     4             $315,000)
     5             (Design and Contingencies - $5,000)
     6         (70)  SR 0028, Allegheny Valley Expressway
     7             Bridge, Northbound over Bull Creek
     8             Road, Tarentum Borough, Bridge
     9             Rehabilitation                                120,000
    10             (Base Construction Allocation -
    11             $115,000)
    12             (Design and Contingencies - $5,000)
    13         (71)  SR 0028, Allegheny Valley Expressway
    14             Bridge, Southbound over Bull Creek
    15             Road, Tarentum Borough, Bridge
    16             Rehabilitation                                120,000
    17             (Base Construction Allocation -
    18             $115,000)
    19             (Design and Contingencies - $5,000)
    20         (72)  SR 0028, Allegheny Valley Expressway,
    21             Bridge over Scout Reservation Road,
    22             Sharpesburg Borough, Bridge
    23             Rehabilitation                              1,000,000
    24             (Base Construction Allocation -
    25             $850,000)
    26             (Design and Contingencies - $150,000)
    27         (73)  SR 0079, Glenfield Bridge over Ramp A
    28             and SR 4033, Glenfield Borough, Bridge
    29             Rehabilitation                                748,000
    30             (Base Construction Allocation -
    19990S0504B1471                 - 43 -

     1             $681,000)
     2             (Design and Contingencies - $67,000)
     3         (74)  SR 0079, I-79 Bridge Northbound over
     4             Turnpike, Marshall Township, Bridge
     5             Painting                                      278,000
     6             (Base Construction Allocation -
     7             $268,000)
     8             (Design and Contingencies - $10,000)
     9         (75)  SR 0079, I-79 Bridge Southbound over
    10             Turnpike, Marshall Township, Bridge
    11             Painting                                      228,000
    12             (Base Construction Allocation -
    13             $218,000)
    14             (Design and Contingencies - $10,000)
    15         (76)  SR 0079, I-79 Neville Island Bridge
    16             over Ohio River, Neville Township,
    17             Bridge Rehabilitation                      12,945,000
    18             (Base Construction Allocation -
    19             $11,200,000)
    20             (Land Allocation - $200,000)
    21             (Design and Contingencies - $1,545,000)
    22         (77)  SR 0121, Greentree Road Bridge over
    23             I-279, Parkway West, Greentree Borough,
    24             Bridge Painting                               192,000
    25             (Base Construction Allocation -
    26             $165,000)
    27             (Land Allocation - $10,000)
    28             (Design and Contingencies - $17,000)
    29         (78)  SR 0376, I-376 Bridge Eastbound over
    30             Haymaker Road, Monroeville Borough,
    19990S0504B1471                 - 44 -

     1             Bridge Painting                               266,000
     2             (Base Construction Allocation -
     3             $256,000)
     4             (Design and Contingencies - $10,000)
     5         (79)  SR 0376, I-376 Bridge Westbound over
     6             Haymaker Road, Monroeville Borough,
     7             Bridge Painting                               155,000
     8             (Base Construction Allocation -
     9             $145,000)
    10             (Design and Contingencies - $10,000)
    11         (80)  SR 0400, SR 0400, SR 4019 and SR 4042
    12             Bridges, Structure Painting, Franklin
    13             Park Borough, Hampton Township and
    14             Pittsburgh, Bridge Painting                   520,000
    15             (Base Construction Allocation -
    16             $500,000)
    17             (Design and Contingencies - $20,000)
    18         (81)  SR 0366, Tarentum Bridge over
    19             Allegheny River, Tarentum Borough,
    20             Bridge Rehabilitation                       4,105,000
    21             (Base Construction Allocation -
    22             $3,665,000)
    23             (Design and Contingencies - $440,000)
    24         (82)  SR 0837, Eighth Avenue Bridge over
    25             Baldwin Road, West Homestead Borough,
    26             Bridge Replacement                          2,529,000
    27             (Base Construction Allocation -
    28             $2,258,000)
    29             (Design and Contingencies - $271,000)
    30         (83)  SR 3078, Burgettstown Road Bridge
    19990S0504B1471                 - 45 -

     1             over Potato Garden Road, Findley
     2             Township, Bridge Replacement                  148,000
     3             (Base Construction Allocation -
     4             $120,000)
     5             (Land Allocation - $10,000)
     6             (Design and Contingencies - $18,000)
     7         (84)  SR 1010, Hart's Run Road Bridge over
     8             Branch of Hart's Run, Hampton Township,
     9             Bridge Replacement                            520,000
    10             (Base Construction Allocation -
    11             $400,000)
    12             (Land Allocation - $20,000)
    13             (Design and Contingencies - $100,000)
    14         (85)  SR 1040, Bakerstown Road Bridge over
    15             Route 28, Tarentum Borough, Bridge
    16             Rehabilitation                                275,000
    17             (Base Construction Allocation -
    18             $270,000)
    19             (Design and Contingencies - $5,000)
    20         (86)  SR 2065, Thompson Run Road Bridge
    21             over Union Railroad, Monroeville
    22             Borough, Bridge Replacement                   550,000
    23             (Base Construction Allocation -
    24             $500,000)
    25             (Design and Contingencies - $50,000)
    26         (87)  SR 2074, Hulton Road Bridge over
    27             Caldwell Run, Penn Hills, Bridge
    28             Replacement                                   117,000
    29             (Base Construction Allocation -
    30             $84,000)
    19990S0504B1471                 - 46 -

     1             (Land Allocation - $20,000)
     2             (Design and Contingencies - $13,000)
     3         (88)  SR 2080, Plum Avenue Bridge over Plum
     4             Creek, Oakmont Borough, Bridge
     5             Painting                                      109,000
     6             (Base Construction Allocation -
     7             $99,000)
     8             (Design and Contingencies - $10,000)
     9         (89)  SR 2082, Hulton Bridge over Conrail
    10             and Allegheny River, Oakmont Borough
    11             and Harmar Township, Bridge
    12             Rehabilitation                                550,000
    13             (Base Construction Allocation -
    14             $450,000)
    15             (Design and Contingencies - $100,000)
    16         (90)  SR 2084, Milltown Road Bridge over
    17             Plum Creek, Penn Hills, Bridge
    18             Painting                                       31,000
    19             (Base Construction Allocation -
    20             $26,000)
    21             (Design and Contingencies - $5,000)
    22         (91)  SR 2085, Birmingham Bridge over Mon
    23             River, CSX Railroad, City of
    24             Pittsburgh, Bridge Rehabilitation           1,455,000
    25             (Base Construction Allocation -
    26             $1,200,000)
    27             (Land Allocation - $5,000)
    28             (Design and Contingencies - $250,000)
    29         (92)  SR 2114, Bowman Avenue Bridge over SR
    30             1066, RPS G & E, Cliff Street, City of
    19990S0504B1471                 - 47 -

     1             McKeesport, Bridge Rehabilitation             300,000
     2             (Base Construction Allocation -
     3             $260,000)
     4             (Design and Contingencies - $40,000)
     5         (93)  SR 3005, Mayview Road Bridge over
     6             Branch Chartiers Creek, South Fayette
     7             Township, Bridge Replacement                  400,000
     8             (Base Construction Allocation -
     9             $320,000)
    10             (Land Allocation - $20,000)
    11             (Design and Contingencies - $60,000)
    12         (94)  SR 3007, Walton Road Bridge over
    13             Branch of Lobbs Run, Jefferson Borough,
    14             Bridge Replacement                             93,000
    15             (Base Construction Allocation -
    16             $63,000)
    17             (Land Allocation - $20,000)
    18             (Design and Contingencies - $10,000)
    19         (95)  SR 3069, Liberty Bridge and Approach
    20             Ramps, Six Structures, City of
    21             Pittsburgh, Bridge Painting                 1,000,000
    22             (Base Construction Allocation -
    23             $900,000)
    24             (Design and Contingencies - $100,000)
    25         (96)  SR 3104, Bridge over Ohio River, City
    26             of Pittsburgh, Bridge Painting                960,000
    27             (Base Construction Allocation -
    28             $950,000)
    29             (Design and Contingencies - $10,000)
    30         (97)  SR 4003, McKnight Road Bridge over
    19990S0504B1471                 - 48 -

     1             Branch Pine Creek, Culvert Repair,
     2             McCandless Township, Bridge
     3             Replacement                                   978,000
     4             (Base Construction Allocation -
     5             $850,000)
     6             (Design and Contingencies - $128,000)
     7         (98)  SR 4025, Bridge over Ohio River,
     8             Sewickley Borough, Bridge Painting            610,000
     9             (Base Construction Allocation -
    10             $600,000)
    11             (Design and Contingencies - $10,000)
    12         (99)  SR 8037, Bridge and Ramp over Saw
    13             Mill Run, City of Pittsburgh, Bridge
    14             Painting                                      584,000
    15             (Base Construction Allocation -
    16             $564,000)
    17             (Design and Contingencies - $20,000)
    18         (100)  SR 0279, Fort Pitt Bridge over
    19             Monongahela River, City of Pittsburgh,
    20             Bridge Rehabilitation                       1,800,000
    21             (Base Project Allocation - $1,800,000)
    22         (101)  SR 1015, RUSSELLTON ROAD RAILROAD                   <--
    23             BRIDGE, INDIANA TOWNSHIP, BRIDGE
    24             REPLACEMENT                                 5,000,000
    25             (BASE CONSTRUCTION ALLOCATION -
    26             $4,000,000)
    27             (LAND ALLOCATION - $500,000)
    28             (DESIGN AND CONTINGENCIES - $500,000)
    29         (102)  SR 2058, HULTON ROAD BRIDGE OVER
    30             ALLEGHENY RIVER, OAKMONT BOROUGH AND
    19990S0504B1471                 - 49 -

     1             HARMAR TOWNSHIP, EXPAND TO FOUR LANES,
     2             BRIDGE REPLACEMENT                        125,000,000
     3         (103)  SR 0048, LINCOLN WAY BRIDGE OVER
     4             UNKNOWN STREAM, WHITE OAK BOROUGH,
     5             BRIDGE RECONSTRUCTION                         250,000
     6         (104)  SR 0048, MCKEE ROAD BRIDGE OVER
     7             UNKNOWN STREAM, WHITE OAK BOROUGH,
     8             BRIDGE RECONSTRUCTION                         300,000
     9         (101) (105)  Various Bridges, Allegheny and                <--
    10             Beaver Counties, Bridge Rehabilitation      8,000,000
    11             (Base Construction Allocation -
    12             $7,200,000)
    13             (Design and Contingencies - $800,000)
    14         (106)  SR 0079, I-79 NORTHBOUND OVER TR 51,                <--
    15             ROBINSON TOWNSHIP, NEW DECK AND PAINT         890,000
    16         (107)  BIRMINGHAM BRIDGE AND RAMPS, CITY OF
    17             PITTSBURGH, BRIDGE REHABILITATION           1,904,000
    18         (108)  SMITHFIELD STREET BRIDGE OVER
    19             MONONGAHELA RIVER AND P&LE RAILROAD,
    20             CITY OF PITTSBURGH, BRIDGE PAINTING           140,000
    21         (109)  FORT DUQUESNE BRIDGE RAMP OVER RAMP
    22             D, CITY OF PITTSBURGH, BRIDGE
    23             REHABILITATION                                185,000
    24         (110)  FORT DUQUESNE BRIDGE RAMP SOUTHBOUND
    25             OVER RAMP D, ALLEGHENY RIVER, CITY OF
    26             PITTSBURGH, BRIDGE REHABILITATION             262,000
    27         (111)  SR 0022/0030, 22/30 EXPRESSWAY,
    28             NORTH FAYETTE TOWNSHIP, BRIDGE
    29             PRESERVATION                                1,000,000
    30  Section 7.  Armstrong County.
    19990S0504B1471                 - 50 -

     1     (a)  Local Bridges
     2         (1)  Boggs Township, T-850, Scrubgrass
     3             Bridge over Scrubgrass Creek, Bridge
     4             Rehabilitation                                230,000
     5             (Base Construction Allocation -
     6             $170,000)
     7             (Land Allocation - $10,000)
     8             (Design and Contingencies - $50,000)
     9         (2)  Boggs Township, T-632, Scrubgrass
    10             Bridge No.2 over Scrubgrass Creek,
    11             Bridge Rehabilitation                         185,000
    12             (Base Construction Allocation -
    13             $150,000)
    14             (Land Allocation - $10,000)
    15             (Design and Contingencies - $25,000)
    16         (3)  Boggs Township, T-821, Pine Creek
    17             Bridge over North Fork of Pine Creek,
    18             Bridge Rehabilitation                         140,000
    19             (Base Construction Allocation -
    20             $100,000)
    21             (Land Allocation - $10,000)
    22             (Design and Contingencies - $30,000)
    23         (4)  North Buffalo Township, T-300, Blaine
    24             Bridge over Buffalo Creek, Bridge
    25             Replacement                                   500,000
    26             (Base Construction Allocation -
    27             $400,000)
    28             (Land Allocation - $20,000)
    29             (Design and Contingencies - $80,000)
    30         (5)  North Buffalo Township, T-414, Church
    19990S0504B1471                 - 51 -

     1             Road Bridge over Stream, Bridge
     2             Replacement                                   150,000
     3             (Base Construction Allocation -
     4             $100,000)
     5             (Land Allocation - $10,000)
     6             (Design and Contingencies - $40,000)
     7         (6)  West Kittanning Borough, T-759, Bridge
     8             over Stream, Bridge Replacement               325,000
     9             (Base Construction Allocation -
    10             $265,000)
    11             (Land Allocation - $10,000)
    12             (Design and Contingencies - $50,000)
    13         (7)  Manorville Borough, Manorville
    14             Railroad Bridge along Former Conrail
    15             Right-of-Way, Bridge Removal                   65,000
    16             (Base Construction Allocation -
    17             $55,000)
    18             (Design and Contingencies - $10,000)
    19         (8)  Pine Township, Templeton Bridge along
    20             Former Conrail Right-of-Way, Bridge
    21             Removal                                        75,000
    22             (Base Construction Allocation -
    23             $65,000)
    24             (Design and Contingencies - $10,000)
    25         (9)  GILPIN TOWNSHIP, T-413, ELDER RUN                     <--
    26             BRIDGE ON FIRE HALL ROAD, BRIDGE
    27             REPLACEMENT                                   460,000
    28             (BASE CONSTRUCTION ALLOCATION -
    29             $340,000)
    30             (LAND ALLOCATION - $10,000)
    19990S0504B1471                 - 52 -

     1             (DESIGN AND CONTINGENCIES - $110,000)
     2     (b)  State Bridges
     3         (1)  SR 0028, Buffalo Creek Bridge over
     4             Buffalo Creek and Conrail, South
     5             Buffalo Township, Bridge Painting           3,010,000
     6             (Base Construction Allocation -
     7             $3,000,000)
     8             (Design and Contingencies - $10,000)
     9         (2)  SR 3023, Iron Bridge Road, Pine Run
    10             Bridge Replacement, South Buffalo
    11             Township, Bridge Replacement                  550,000
    12             (Base Construction Allocation -
    13             $510,000)
    14             (Land Allocation - $20,000)
    15             (Design and Contingencies - $20,000)
    16         (3)  SR 0156, Long Run Bridge over Long
    17             Run, Kiskiminetas Township, Bridge
    18             Painting                                       75,000
    19             (Base Construction Allocation -
    20             $60,000)
    21             (Design and Contingencies - $15,000)
    22         (4)  SR 0422, US 422 Eastbound Overpass
    23             Bridge over SR 0028, East Franklin
    24             Township, Bridge Painting                     190,000
    25             (Base Construction Allocation -
    26             $175,000)
    27             (Design and Contingencies - $15,000)
    28         (5)  SR 0422, US 422 Westbound Overpass
    29             Bridge over SR 0028, East Franklin
    30             Township, Bridge Painting                     190,000
    19990S0504B1471                 - 53 -

     1             (Base Construction Allocation -
     2             $175,000)
     3             (Design and Contingencies - $15,000)
     4         (6)  SR 1028, Oscar Bridge over Pine Creek,
     5             Boggs Township, Bridge Painting                95,000
     6             (Base Construction Allocation -
     7             $80,000)
     8             (Design and Contingencies - $15,000)
     9         (7)  SR 0028, Buffalo Creek Bridge over
    10             Buffalo Creek, South Buffalo Township,
    11             Bridge Painting                             1,730,000
    12             (Base Construction Allocation -
    13             $1,700,000)
    14             (Design and Contingencies - $30,000)
    15         (8)  SR 0066, Guffy Run Bridge over Guffy
    16             Run, Parks Township, Bridge Painting           85,000
    17             (Base Construction Allocation -
    18             $70,000)
    19             (Design and Contingencies - $15,000)
    20         (9)  SR 0066, Garrett's Run Bridge over
    21             Garrett's Run and Old 66, Manor
    22             Township, Bridge Painting                   1,230,000
    23             (Base Construction Allocation -
    24             $1,200,000)
    25             (Design and Contingencies - $30,000)
    26         (10)  SR 0128, Cadogan Bridge over
    27             Tributary of Allegheny River, Cadogan
    28             Township, Bridge Painting                     380,000
    29             (Base Construction Allocation -
    30             $360,000)
    19990S0504B1471                 - 54 -

     1             (Design and Contingencies - $20,000)
     2         (11)  SR 0422, Judge Graff Bridge over
     3             Allegheny River, North Buffalo
     4             Township, Bridge Painting                   2,930,000
     5             (Base Construction Allocation -
     6             $2,900,000)
     7             (Design and Contingencies - $30,000)
     8         (12)  SR 0422, Ramp C and F Bridge over End
     9             of Bypass, Manor Township, Bridge
    10             Painting                                      180,000
    11             (Base Construction Allocation -
    12             $165,000)
    13             (Design and Contingencies - $15,000)
    14         (13)  SR 0422, Ramp F Bridge over SR 0066,
    15             Manor Township, Bridge Painting               190,000
    16             (Base Construction Allocation -
    17             $175,000)
    18             (Design and Contingencies - $15,000)
    19         (14)  SR 1021, Eddyville Bridge over Pine
    20             Run, Redbank Township, Bridge Painting        100,000
    21             (Base Construction Allocation -
    22             $85,000)
    23             (Design and Contingencies - $15,000)
    24         (15)  SR 1028, Bryan Bridge over Branch of
    25             Pine Creek, Cowanshannock Township,
    26             Bridge Painting                                50,000
    27             (Base Construction Allocation -
    28             $35,000)
    29             (Design and Contingencies - $15,000)
    30         (16)  SR 1034, Mosgrove Bridge over North
    19990S0504B1471                 - 55 -

     1             Fork of Pine Creek, Boggs Township,
     2             Bridge Painting                                65,000
     3             (Base Construction Allocation -
     4             $50,000)
     5             (Design and Contingencies - $15,000)
     6         (17)  SR 1037, Echo Bridge over Pine Creek,
     7             Wayne Township, Bridge Painting                85,000
     8             (Base Construction Allocation -
     9             $70,000)
    10             (Design and Contingencies - $15,000)
    11         (18)  SR 2001, Rural Valley Bridge over
    12             Cowanshannock Creek, Rural Valley
    13             Borough, Bridge Painting                      130,000
    14             (Base Construction Allocation -
    15             $115,000)
    16             (Design and Contingencies - $15,000)
    17         (19)  SR 2005, Brick Church Bridge over
    18             Branch of Cherry Run, Burrell Township,
    19             Bridge Painting                                75,000
    20             (Base Construction Allocation -
    21             $60,000)
    22             (Design and Contingencies - $15,000)
    23         (20)  SR 2005, Cherry Run Bridge over
    24             Cherry Run, Plumcreek Township, Bridge
    25             Painting                                       85,000
    26             (Base Construction Allocation -
    27             $70,000)
    28             (Design and Contingencies - $15,000)
    29         (21)  SR 2005, Elgin Cemetery Bridge over
    30             Cowanshannock Creek, Cowanshannock
    19990S0504B1471                 - 56 -

     1             Township, Bridge Painting                      85,000
     2             (Base Construction Allocation -
     3             $70,000)
     4             (Design and Contingencies - $15,000)
     5         (22)  SR 2010, Garrett's Run Bridge over
     6             Garrett's Run, Manor Township, Bridge
     7             Painting                                       75,000
     8             (Base Construction Allocation -
     9             $60,000)
    10             (Design and Contingencies - $15,000)
    11         (23)  SR 2023, Wheel-in-Campground Bridge
    12             over Plum Creek, Plumcreek Township,
    13             Bridge Painting                               125,000
    14             (Base Construction Allocation -
    15             $110,000)
    16             (Design and Contingencies - $15,000)
    17         (24)  SR 2025, Garrett's Run Bridge No.1
    18             over Garrett's Run, Manor Township,
    19             Bridge Painting                                80,000
    20             (Base Construction Allocation -
    21             $65,000)
    22             (Design and Contingencies - $15,000)
    23         (25)  SR 2025, Garrett's Run Bridge No.2
    24             over Garrett's Run, Manor Township,
    25             Bridge Painting                                80,000
    26             (Base Construction Allocation -
    27             $65,000)
    28             (Design and Contingencies - $15,000)
    29         (26)  SR 2025, Garrett's Run Bridge No.3
    30             over Garrett's Run, Manor Township,
    19990S0504B1471                 - 57 -

     1             Bridge Painting                                90,000
     2             (Base Construction Allocation -
     3             $75,000)
     4             (Design and Contingencies - $15,000)
     5         (27)  SR 2027, Girty Bridge over Crooked
     6             Creek, South Bend Township, Bridge
     7             Painting                                      155,000
     8             (Base Construction Allocation -
     9             $140,000)
    10             (Design and Contingencies - $15,000)
    11         (28)  SR 2029, Kelly's Station Road Bridge
    12             over Taylor Run, Bethel Township,
    13             Bridge Painting                                60,000
    14             (Base Construction Allocation -
    15             $45,000)
    16             (Design and Contingencies - $15,000)
    17         (29)  SR 2036, Stilt's Run Bridge over
    18             Stilt's Run, Parks Township, Bridge
    19             Painting                                       50,000
    20             (Base Construction Allocation -
    21             $35,000)
    22             (Design and Contingencies - $15,000)
    23         (30)  SR 2036, Carnahan Run Bridge over
    24             Carnahan Run, Parks Township, Bridge
    25             Painting                                       75,000
    26             (Base Construction Allocation -
    27             $60,000)
    28             (Design and Contingencies - $15,000)
    29         (31)  SR 2050, Rattling Run Bridge over
    30             Rattling Run, Kiskiminetas Township,
    19990S0504B1471                 - 58 -

     1             Bridge Painting                                65,000
     2             (Base Construction Allocation -
     3             $50,000)
     4             (Design and Contingencies - $15,000)
     5         (32)  SR 2051, Flat Run Bridge over Flat
     6             Run, Kiskiminetas Township, Bridge
     7             Painting                                       55,000
     8             (Base Construction Allocation -
     9             $40,000)
    10             (Design and Contingencies - $15,000)
    11         (33)  SR 2051, Equitable Bridge over
    12             Rattling Run, Kiskiminetas Township,
    13             Bridge Painting                                55,000
    14             (Base Construction Allocation -
    15             $40,000)
    16             (Design and Contingencies - $15,000)
    17         (34)  SR 2057, Parks Pump Station Bridge
    18             No.1 over Carnahan Run, Parks Township,
    19             Bridge Painting                                80,000
    20             (Base Construction Allocation -
    21             $65,000)
    22             (Design and Contingencies - $15,000)
    23         (35)  SR 2058, Parks Pump Station Bridge
    24             No.2 over Carnahan Run, Parks Township,
    25             Bridge Painting                                75,000
    26             (Base Construction Allocation -
    27             $60,000)
    28             (Design and Contingencies - $15,000)
    29         (36)  SR 3005, Glade Run Bridge over Glade
    30             Run, North Buffalo Township, Bridge
    19990S0504B1471                 - 59 -

     1             Painting                                       75,000
     2             (Base Construction Allocation -
     3             $60,000)
     4             (Design and Contingencies - $15,000)
     5         (37)  SR 3013, Little Buffalo Bridge over
     6             Little Buffalo Creek, West Franklin
     7             Township, Bridge Painting                     100,000
     8             (Base Construction Allocation -
     9             $85,000)
    10             (Design and Contingencies - $15,000)
    11         (38)  SR 3013, Harrigan Run Bridge over
    12             Harrigan Run, West Franklin Township,
    13             Bridge Painting                                60,000
    14             (Base Construction Allocation -
    15             $45,000)
    16             (Design and Contingencies - $15,000)
    17         (39)  SR 3017, West Penn Power Bridge over
    18             SR 0422 and SR 0028, East Franklin
    19             Township, Bridge Painting                     375,000
    20             (Base Construction Allocation -
    21             $360,000)
    22             (Design and Contingencies - $15,000)
    23         (40)  SR 4007, Kaylor Bridge over Sugar
    24             Creek, Bradys Bend Township, Bridge
    25             Painting                                       60,000
    26             (Base Construction Allocation -
    27             $45,000)
    28             (Design and Contingencies - $15,000)
    29         (41)  SR 4013, Foster Mills Bridge over
    30             Branch of Patterson Run, Sugarcreek
    19990S0504B1471                 - 60 -

     1             Township, Bridge Painting                      70,000
     2             (Base Construction Allocation -
     3             $55,000)
     4             (Design and Contingencies - $15,000)
     5         (42)  SR 8008, Ford City Ramp from Judge
     6             Graff Bridge over a ravine, Manor
     7             Township, Bridge Painting                     555,000
     8             (Base Construction Allocation -
     9             $540,000)
    10             (Design and Contingencies - $15,000)
    11         (43)  SR 4035, Craigsville Bridge over
    12             Buffalo Creek, West Franklin Township,
    13             Bridge Painting                               140,000
    14             (Base Construction Allocation -
    15             $125,000)
    16             (Design and Contingencies - $15,000)
    17         (44)  SR 0068, Kaylor Overpass, Railroad
    18             over PA 68, Bradys Bend Township,
    19             Bridge Removal                                560,000
    20             (Base Construction Allocation -
    21             $500,000)
    22             (Land Allocation - $10,000)
    23             (Design and Contingencies - $50,000)
    24         (45)  SR 0068, B&LE Railroad Overpass,
    25             Bradys Bend Township, Bridge Removal           55,000
    26             (Base Construction Allocation -
    27             $50,000)
    28             (Design and Contingencies - $5,000)
    29         (46)  SR 0028, Pine Creek Bridge over Pine
    30             Creek, Boggs Township, Bridge
    19990S0504B1471                 - 61 -

     1             Rehabilitation                              1,450,000
     2             (Base Construction Allocation -
     3             $1,000,000)
     4             (Land Allocation - $100,000)
     5             (Design and Contingencies - $350,000)
     6         (47)  SR 0028, Big Glade Run Bridge over
     7             Big Glade Run, North Buffalo Township,
     8             Bridge Rehabilitation                       1,450,000
     9             (Base Construction Allocation -
    10             $1,000,000)
    11             (Land Allocation - $100,000)
    12             (Design and Contingencies - $350,000)
    13         (48)  SR 0028, Cowanshannock Creek Bridge
    14             over Cowanshannock Creek, Rayburn
    15             Township, Bridge Rehabilitation             1,450,000
    16             (Base Construction Allocation -
    17             $1,000,000)
    18             (Land Allocation - $100,000)
    19             (Design and Contingencies - $350,000)
    20         (49)  SR 0028, Bridge over Branch of
    21             Cowanshannock Creek, Rayburn Township,
    22             Bridge Rehabilitation                       1,450,000
    23             (Base Construction Allocation -
    24             $1,000,000)
    25             (Land Allocation - $100,000)
    26             (Design and Contingencies - $350,000)
    27         (50)  SR 0028, Hays Run Bridge over Hays
    28             Run, Rayburn Township, Bridge
    29             Rehabilitation                              1,450,000
    30             (Base Construction Allocation -
    19990S0504B1471                 - 62 -

     1             $1,000,000)
     2             (Land Allocation - $100,000)
     3             (Design and Contingencies - $350,000)
     4         (51)  SR 0028, Furnace Run Bridge over
     5             Furnace Run, South Buffalo Township,
     6             Bridge Rehabilitation                       1,450,000
     7             (Base Construction Allocation -
     8             $1,000,000)
     9             (Land Allocation - $100,000)
    10             (Design and Contingencies - $350,000)
    11         (52)  SR 0028, Pine Run Bridge over Pine
    12             Run, South Buffalo Township, Bridge
    13             Rehabilitation                              1,450,000
    14             (Base Construction Allocation -
    15             $1,000,000)
    16             (Land Allocation - $100,000)
    17             (Design and Contingencies - $350,000)
    18         (53)  SR 0028, Bostonia Run Bridge over
    19             Bostonia Run, South Buffalo Township,
    20             Bridge Rehabilitation                       1,450,000
    21             (Base Construction Allocation -
    22             $1,000,000)
    23             (Land Allocation - $100,000)
    24             (Design and Contingencies - $350,000)
    25         (54)  SR 0028, Scrubgrass Creek Bridge over
    26             Scrubgrass Creek, Wayne Township,
    27             Bridge Rehabilitation                       1,450,000
    28             (Base Construction Allocation -
    29             $1,000,000)
    30             (Land Allocation - $100,000)
    19990S0504B1471                 - 63 -

     1             (Design and Contingencies - $350,000)
     2         (55)  SR 0210, South Bend Pump Station
     3             Bridge over Crooked Creek, South Bend
     4             Township, Bridge Rehabilitation               680,000
     5             (Base Construction Allocation -
     6             $600,000)
     7             (Design and Contingencies - $80,000)
     8         (56)  SR 0268, B & P Railroad Overpass over
     9             Railroad at Cowan Station, East
    10             Franklin Township, Bridge Replacement         610,000
    11             (Base Construction Allocation -
    12             $500,000)
    13             (Land Allocation - $40,000)
    14             (Design and Contingencies - $70,000)
    15         (57)  SR 0268, Hovey Bridge over Small
    16             Stream, Hovey Township, Bridge
    17             Rehabilitation                              1,050,000
    18             (Base Construction Allocation -
    19             $750,000)
    20             (Land Allocation - $50,000)
    21             (Design and Contingencies - $250,000)
    22         (58)  SR 0268, Church Run Bridge over
    23             Church Run, Parker City, Bridge
    24             Rehabilitation                              1,050,000
    25             (Base Construction Allocation -
    26             $750,000)
    27             (Land Allocation - $50,000)
    28             (Design and Contingencies - $250,000)
    29         (59)  SR 0268, Allison Run Bridge over
    30             Allison Run, West Kittaning Township,
    19990S0504B1471                 - 64 -

     1             Bridge Rehabilitation                       1,450,000
     2             (Base Construction Allocation -
     3             $1,000,000)
     4             (Land Allocation - $100,000)
     5             (Design and Contingencies - $350,000)
     6         (60)  SR 0422, Big Buffalo Creek Bridge
     7             over Big Buffalo Creek, West Franklin
     8             Township, Bridge Rehabilitation             1,050,000
     9             (Base Construction Allocation -
    10             $750,000)
    11             (Land Allocation - $50,000)
    12             (Design and Contingencies - $250,000)
    13         (61)  SR 1013, Oak Ridge Bridge over Branch
    14             Redbank Creek, Redbank Township, Bridge
    15             Deck Replacement                              260,000
    16             (Base Construction Allocation -
    17             $200,000)
    18             (Land Allocation - $10,000)
    19             (Design and Contingencies - $50,000)
    20         (62)  SR 1012, Bridge over Nye Run Branch,
    21             Redbank Township, Bridge Replacement          195,000
    22             (Base Construction Allocation -
    23             $110,000)
    24             (Land Allocation - $10,000)
    25             (Design and Contingencies - $75,000)
    26         (63)  SR 2001, Gastown North Bridge over
    27             Redbank Creek, Plumcreek Township,
    28             Bridge Replacement                            195,000
    29             (Base Construction Allocation -
    30             $110,000)
    19990S0504B1471                 - 65 -

     1             (Land Allocation - $10,000)
     2             (Design and Contingencies - $75,000)
     3         (64)  SR 2003, Gastown Bridge over Cessna
     4             Run, Plumcreek Township, Bridge
     5             Replacement                                   185,000
     6             (Base Construction Allocation -
     7             $100,000)
     8             (Land Allocation - $10,000)
     9             (Design and Contingencies - $75,000)
    10         (65)  SR 4007, Rest Home Road Bridge over
    11             Small Stream, Sugarcreek Township,
    12             Bridge Replacement                            185,000
    13             (Base Construction Allocation -
    14             $100,000)
    15             (Land Allocation - $10,000)
    16             (Design and Contingencies - $75,000)
    17         (66)  SR 4033, Lair's Crossing Road Bridge
    18             over Small Stream, West Franklin
    19             Township, Bridge Replacement                  205,000
    20             (Base Construction Allocation -
    21             $120,000)
    22             (Land Allocation - $10,000)
    23             (Design and Contingencies - $75,000)
    24  Section 8.  Beaver County.
    25     (a)  Local Bridges
    26         (1)  Ambridge and Aliquippa Boroughs,
    27             Ambridge - Aliquippa Bridge over Ohio
    28             River, Bridge Construction                 38,000,000
    29             (Base Construction Allocation -
    30             $30,000,000)
    19990S0504B1471                 - 66 -

     1             (Land Allocation - $4,000,000)
     2             (Design and Contingencies - $4,000,000)
     3         (2)  Vanport Township, Vanport Bridge No.6
     4             over Two Mile Run, Bridge Replacement         465,000
     5             (Base Construction Allocation -
     6             $375,000)
     7             (Land Allocation - $10,000)
     8             (Design and Contingencies - $80,000)
     9         (3)  Vanport Township, Vanport Bridge No.7
    10             over Two Mile Run, Bridge Replacement         470,000
    11             (Base Construction Allocation -
    12             $380,000)
    13             (Land Allocation - $10,000)
    14             (Design and Contingencies - $80,000)
    15         (4)  Vanport Township, Vanport Bridge No.8
    16             over Two Mile Run, Bridge Replacement         510,000
    17             (Base Construction Allocation -
    18             $420,000)
    19             (Land Allocation - $10,000)
    20             (Design and Contingencies - $80,000)
    21         (5)  Vanport Township, Vanport Bridge No.9
    22             over Two Mile Run, Bridge Replacement         440,000
    23             (Base Construction Allocation -
    24             $350,000)
    25             (Land Allocation - $10,000)
    26             (Design and Contingencies - $80,000)
    27         (6)  Borough of New Galilee, Washington
    28             Street Bridge over Jordan Run, Bridge
    29             Replacement                                 1,000,000
    30     (b)  State Bridges
    19990S0504B1471                 - 67 -

     1         (1)  SR 0051, Bridge over New York Avenue,
     2             Ramp A, Rochester Borough, Bridge Deck
     3             Replacement                                 5,600,000
     4             (Base Construction Allocation -
     5             $5,500,000)
     6             (Design and Contingencies - $100,000)
     7         (2)  SR 0351, 5th Street, Koppel-Ellwood
     8             Bridge over Beaver River, Koppel
     9             Borough and North Sewickley Township,
    10             Bridge Replacement, Phase I                33,500,000
    11             (Base Construction Allocation -
    12             $30,000,000)
    13             (Land Allocation - $1,000,000)
    14             (Design and Contingencies - $2,500,000)
    15         (3)  SR 1014, Wise's Grove Road Bridge over
    16             Brush Creek, Marion Township, Bridge
    17             Rehabilitation                                750,000
    18             (Base Construction Allocation -
    19             $600,000)
    20             (Land Allocation - $50,000)
    21             (Design and Contingencies - $100,000)
    22         (4)  SR 1022, 13th Street Bridge over
    23             Blockhouse Run at Pulaski County Line,
    24             New Brighton Borough, Bridge
    25             Replacement                                   780,000
    26             (Base Construction Allocation -
    27             $480,000)
    28             (Land Allocation - $50,000)
    29             (Design and Contingencies - $250,000)
    30         (5)  SR 4032, Engle Road Bridge over Six
    19990S0504B1471                 - 68 -

     1             Mile Run Creek, Industry Borough,
     2             Bridge Replacement                            350,000
     3             (Base Construction Allocation -
     4             $200,000)
     5             (Land Allocation - $50,000)
     6             (Design and Contingencies - $100,000)
     7         (6)  SR 4033, Wildwood Road Bridge over
     8             Brady's Run, Patterson Township, Bridge
     9             Replacement                                   400,000
    10             (Base Construction Allocation -
    11             $250,000)
    12             (Land Allocation - $50,000)
    13             (Design and Contingencies - $100,000)
    14         (7)  SR 8035, Ramp A at LR 641 over Slope,
    15             Rochester Borough, Bridge
    16             Rehabilitation                              1,200,000
    17             (Base Construction Allocation -
    18             $1,000,000)
    19             (Land Allocation - $50,000)
    20             (Design and Contingencies - $150,000)
    21         (8)  SR 8037, Ramp F over TR 51 and TR 65
    22             Northbound, Rochester Borough, Bridge
    23             Replacement                                   550,000
    24             (Base Construction Allocation -
    25             $400,000)
    26             (Land Allocation - $50,000)
    27             (Design and Contingencies - $100,000)
    28         (9)  SR 8039, Ramp AD, SR 0168 over TR 51,
    29             Bridgewater Borough, Bridge
    30             Rehabilitation                                700,000
    19990S0504B1471                 - 69 -

     1             (Base Construction Allocation -
     2             $550,000)
     3             (Land Allocation - $50,000)
     4             (Design and Contingencies - $100,000)
     5         (10)  SR 3018, Culvert-pipe Style Bridge
     6             over Moody's Run, Greene Township,
     7             Bridge Construction                           385,000
     8             (Base Construction Allocation -
     9             $350,000)
    10             (Design and Contingencies - $35,000)
    11         (11)  SR 0051, Pennsylvania Avenue Bridge
    12             over Brady's Run Creek, Fallston
    13             Borough, Bridge Replacement                   757,000
    14             (Base Construction Allocation -
    15             $637,000)
    16             (Land Allocation - $20,000)
    17             (Design and Contingencies - $100,000)
    18         (12)  SR 0060, Beaver Valley Extension
    19             Southbound Bridge over T-535, Brighton
    20             Township, Bridge Rehabilitation               167,000
    21             (Base Construction Allocation -
    22             $153,000)
    23             (Design and Contingencies - $14,000)
    24         (13)  SR 0060, Beaver Valley Extension
    25             Northbound Bridge over T-535, Brighton
    26             Township, Bridge Rehabilitation               178,000
    27             (Base Construction Allocation -
    28             $163,000)
    29             (Design and Contingencies - $15,000)
    30         (14)  SR 0060, Beaver Valley Expansion
    19990S0504B1471                 - 70 -

     1             Bridge over SR 0151, Hopewell Township,
     2             Bridge Deck Replacement                     1,125,000
     3             (Base Construction Allocation -
     4             $1,000,000)
     5             (Design and Contingencies - $125,000)
     6         (15)  SR 0588, Riverview Road Bridge over
     7             Pine Run, Marion Township, Bridge
     8             Replacement                                   250,000
     9             (Base Construction Allocation -
    10             $150,000)
    11             (Design and Contingencies - $100,000)
    12         (16)  SR 1009, Hartzel Road Bridge over
    13             Connoquenessing Creek, Marion Township,
    14             Bridge Replacement                          1,150,000
    15             (Base Construction Allocation -
    16             $1,000,000)
    17             (Land Allocation - $50,000)
    18             (Design and Contingencies - $100,000)
    19         (17)  SR 1016, Tatko Road Bridge over Brush
    20             Creek, New Sewickley Township, Bridge
    21             Replacement                                   420,000
    22             (Base Construction Allocation -
    23             $300,000)
    24             (Land Allocation - $20,000)
    25             (Design and Contingencies - $100,000)
    26         (18)  SR 1032, New York Avenue Bridge over
    27             Conrail, SR 1032 and Local Street,
    28             Rochester Borough, Bridge
    29             Rehabilitation                              3,100,000
    30             (Base Construction Allocation -
    19990S0504B1471                 - 71 -

     1             $3,000,000)
     2             (Design and Contingencies - $100,000)
     3         (19)  SR 4035, Sebring Road Bridge over SR
     4             0060, Brighton Township, Bridge
     5             Rehabilitation                                394,000
     6             (Base Construction Allocation -
     7             $361,000)
     8             (Design and Contingencies - $33,000)
     9         (20)  SR 3032, Kendal Harshavile Road
    10             Bridge over Branch of Traverse Creek,
    11             Hanover Township, Bridge Replacement          250,000
    12             (Base Construction Allocation -
    13             $100,000)
    14             (Land Allocation - $50,000)
    15             (Design and Contingencies - $100,000)
    16         (21)  SR 4012, Brady's Run Bridge over
    17             South Branch Brady's Run, Brighton
    18             Township, Bridge Painting                      32,000
    19             (Base Construction Allocation -
    20             $27,000)
    21             (Design and Contingencies - $5,000)
    22         (22)  SR 4020, Dutch Ridge Road Bridge over
    23             PA 60, Brighton Township, Bridge
    24             Rehabilitation                                500,000
    25             (Base Construction Allocation -
    26             $350,000)
    27             (Land Allocation - $50,000)
    28             (Design and Contingencies - $100,000)
    29         (23)  SR 4032, Engle Road Bridge over Six
    30             Mile Run, Industry Borough, Bridge
    19990S0504B1471                 - 72 -

     1             Painting                                       36,000
     2             (Base Construction Allocation -
     3             $31,000)
     4             (Design and Contingencies - $5,000)
     5         (24)  SR 0060, Vanport Bridge over Ohio
     6             River, Vanport Borough, Bridge
     7             Painting                                      965,000
     8             (Base Construction Allocation -
     9             $950,000)
    10             (Design and Contingencies - $15,000)
    11         (25)  SR 0018, FRANKFORD ROAD BRIDGE OVER                  <--
    12             TRAVERSE CREEK, HANOVER TOWNSHIP,
    13             BRIDGE REPLACEMENT                            870,000
    14             (BASE CONSTRUCTION ALLOCATION -
    15             $600,000)
    16             (LAND ALLOCATION - $20,000)
    17             (DESIGN AND CONTINGENCIES - $250,000)
    18         (26)  SR 0051, PENNSYLVANIA AVENUE BRIDGE
    19             OVER SR 4013, SOUTH BEAVER TOWNSHIP,
    20             BRIDGE REHABILITATION                       1,210,000
    21             (BASE CONSTRUCTION ALLOCATION -
    22             $1,000,000)
    23             (LAND ALLOCATION - $10,000)
    24             (DESIGN AND CONTINGENCIES - $200,000)
    25         (27)  SR 3036, GRINGO INDEPENDENCE ROAD
    26             BRIDGE OVER SR 0060, HOPEWELL TOWNSHIP,
    27             BRIDGE REPLACEMENT                          2,455,000
    28             (BASE CONSTRUCTION ALLOCATION -
    29             $2,200,000)
    30             (LAND ALLOCATION - $5,000)
    19990S0504B1471                 - 73 -

     1             (DESIGN AND CONTINGENCIES - $250,000)
     2         (28)  SR 0060, BEAVER VALLEY EXPRESSWAY
     3             BRIDGE OVER SR 4008, CHIPPEWA TOWNSHIP,
     4             BRIDGE REHABILITATION                         660,000
     5             (BASE CONSTRUCTION ALLOCATION -
     6             $500,000)
     7             (LAND ALLOCATION - $10,000)
     8             (DESIGN AND CONTINGENCIES - $150,000)
     9         (29)  SR 0151, BOCKTOWN ROAD BRIDGE OVER
    10             RAREDON RUN, INDEPENDENCE TOWNSHIP,
    11             BRIDGE REHABILITATION                         820,000
    12             (BASE CONSTRUCTION ALLOCATION -
    13             $550,000)
    14             (LAND ALLOCATION - $20,000)
    15             (DESIGN AND CONTINGENCIES - $250,000)
    16         (30)  SR 0168, FAIRVIEW ROAD BRIDGE OVER
    17             UPPER DRY RUN, OHIOVILLE BOROUGH,
    18             BRIDGE REHABILITATION                         770,000
    19             (BASE CONSTRUCTION ALLOCATION -
    20             $500,000)
    21             (LAND ALLOCATION - $20,000)
    22             (DESIGN AND CONTINGENCIES - $250,000)
    23         (31)  SR 0168, TUSCARWAS ROAD BRIDGE OVER
    24             BRUSH RUN, SOUTH BEAVER TOWNSHIP,
    25             BRIDGE REPLACEMENT                            870,000
    26             (BASE CONSTRUCTION ALLOCATION -
    27             $600,000)
    28             (LAND ALLOCATION - $20,000)
    29             (DESIGN AND CONTINGENCIES - $250,000)
    30         (32)  SR 3022, CLEARVIEW ROAD BRIDGE OVER
    19990S0504B1471                 - 74 -

     1             SERVICE CREEK, INDEPENDENCE TOWNSHIP,
     2             BRIDGE PAINTING                               330,000
     3             (BASE CONSTRUCTION ALLOCATION -
     4             $300,000)
     5             (LAND ALLOCATION - $5,000)
     6             (DESIGN AND CONTINGENCIES - $25,000)
     7         (33)  SR 3025, BOCKTOWN CORK ROAD BRIDGE
     8             OVER RAREDON RUN, INDEPENDENCE
     9             TOWNSHIP, BRIDGE REHABILITATION               485,000
    10             (BASE CONSTRUCTION ALLOCATION -
    11             $430,000)
    12             (LAND ALLOCATION - $5,000)
    13             (DESIGN AND CONTINGENCIES - $50,000)
    14         (34)  SR 3026, TOMLINSON ROAD BRIDGE OVER
    15             BRANCH OF TOMLINSON RUN, HANOVER
    16             TOWNSHIP, BRIDGE REPLACEMENT                  870,000
    17             (BASE CONSTRUCTION ALLOCATION -
    18             $600,000)
    19             (LAND ALLOCATION - $20,000)
    20             (DESIGN AND CONTINGENCIES - $250,000)
    21             (DESIGN AND CONTINGENCIES - $250,000)
    22         (35)  SR 3027, GEORGETOWN ROAD BRIDGE OVER
    23             BRANCH OF MILL CREEK, GREENE TOWNSHIP,
    24             BRIDGE REPLACEMENT                            820,000
    25             (BASE CONSTRUCTION ALLOCATION -
    26             $550,000)
    27             (LAND ALLOCATION - $20,000)
    28             (DESIGN AND CONTINGENCIES - $250,000)
    29         (36)  SR 3027, GEORGETOWN ROAD BRIDGE OVER
    30             MILL CREEK, GREENE TOWNSHIP, BRIDGE
    19990S0504B1471                 - 75 -

     1             REPLACEMENT                                   770,000
     2             (BASE CONSTRUCTION ALLOCATION -
     3             $550,000)
     4             (LAND ALLOCATION - $20,000)
     5             (DESIGN AND CONTINGENCIES - $200,000)
     6         (37)  SR 4034, WESTWOOD ROAD BRIDGE OVER
     7             UPPER DRY RUN, OHIOVILLE BOROUGH,
     8             BRIDGE REPLACEMENT                            880,000
     9             (BASE CONSTRUCTION ALLOCATION -
    10             $600,000)
    11             (LAND ALLOCATION - $30,000)
    12             (DESIGN AND CONTINGENCIES - $250,000)
    13         (38)  SR 4053, ALPHA DRIVE BRIDGE OVER SR
    14             0051, SOUTH BEAVER TOWNSHIP, BRIDGE
    15             PAINTING                                      435,000
    16             (BASE CONSTRUCTION ALLOCATION -
    17             $400,000)
    18             (LAND ALLOCATION - $5,000)
    19             (DESIGN AND CONTINGENCIES - $30,000)
    20  Section 9.  Bedford County.
    21     (a)  Local Bridges
    22         (1)  Broad Top Township, T-550, Mosquito
    23             Bridge over Six Mile Run, Bridge
    24             Replacement                                   505,000
    25             (Base Construction Allocation -
    26             $400,000)
    27             (Land Allocation - $10,000)
    28             (Design and Contingencies - $95,000)
    29         (2)  Broad Top Township, T-553, Langdondale
    30             Bridge over Sandy Run, Bridge
    19990S0504B1471                 - 76 -

     1             Replacement                                   395,000
     2             (Base Construction Allocation -
     3             $300,000)
     4             (Land Allocation - $10,000)
     5             (Design and Contingencies - $85,000)
     6         (3)  Broad Top Township, T-583, Longs Run
     7             Bridge over Longs Run, Bridge
     8             Replacement                                   395,000
     9             (Base Construction Allocation -
    10             $300,000)
    11             (Land Allocation - $10,000)
    12             (Design and Contingencies - $85,000)
    13         (4)  Harrison Township, T-418, Turner
    14             Covered Bridge over Juniata River,
    15             Bridge Rehabilitation                         825,000
    16             (Base Construction Allocation -
    17             $700,000)
    18             (Land Allocation - $25,000)
    19             (Design and Contingencies - $100,000)
    20         (5)  Monroe Township, T-354, Sideling Hill
    21             over East Branch Sideling Hill Creek,
    22             Bridge Replacement                            335,000
    23             (Base Construction Allocation -
    24             $250,000)
    25             (Land Allocation - $10,000)
    26             (Design and Contingencies - $75,000)
    27         (6)  South Woodbury Township, T-705 over
    28             Three Springs Run, Bridge Replacement         450,000
    29             (Base Construction Allocation -
    30             $325,000)
    19990S0504B1471                 - 77 -

     1             (Land Allocation - $50,000)
     2             (Design and Contingencies - $75,000)
     3         (7)  West St. Clair Township, T-565 over
     4             Dunning Creek, Bridge Replacement             550,000  <--
     5             (Base Construction Allocation -
     6             $450,000)
     7             (Land Allocation - $25,000)
     8             (Design and Contingencies - $75,000)
     9             DUNNING CREEK, BRIDGE REPLACEMENT           1,250,000  <--
    10             (BASE CONSTRUCTION ALLOCATION -
    11             $935,000)
    12             (LAND ALLOCATION - $10,000)
    13             (DESIGN AND CONTINGENCIES - $305,000)
    14         (8)  Londonderry Township, T-653 over Wills
    15             Creek, Bridge Replacement                     945,000
    16             (Base Construction Allocation -
    17             $850,000)
    18             (Land Allocation - $20,000)
    19             (Design and Contingencies - $75,000)
    20         (9)  East Providence Township, T-419 over
    21             Brush Creek, Bridge Replacement             1,170,000
    22             (Base Construction Allocation -
    23             $1,000,000)
    24             (Land Allocation - $20,000)
    25             (Design and Contingencies - $150,000)
    26         (10)  Broadtop Township, T-677, Riddlesburg
    27             Bridge, County Bridge No.35 over Six
    28             Mile Run, Bridge Replacement                  190,000
    29             (Base Construction Allocation -
    30             $150,000)
    19990S0504B1471                 - 78 -

     1             (Land Allocation - $5,000)
     2             Design and Contingencies - $35,000)
     3         (11)  Mann Township, T-319, County Bridge
     4             No.27 over Sidling Hill Creek, Bridge
     5             Replacement                                   620,000  <--
     6             (Base Construction Allocation -
     7             $500,000)
     8             (Land Allocation - $20,000)
     9             (Design and Contingencies - $100,000)
    10             REPLACEMENT                                 1,450,000  <--
    11             (BASE CONSTRUCTION ALLOCATION -
    12             $1,125,000)
    13             (LAND ALLOCATION - $10,000)
    14             (DESIGN AND CONTINGENCIES - $315,000)
    15         (12)  Cumberland Valley Township, T-377
    16             over Beaver's Run, Bridge Replacement         410,000
    17             (Base Construction Allocation -
    18             $325,000)
    19             (Land Allocation - $5,000)
    20             (Design and Contingencies - $80,000)
    21         (13)  Cumberland Valley Township, T-337
    22             over Evitts Creek, Bridge Replacement         455,000
    23             (Base Construction Allocation -
    24             $370,000)
    25             (Land Allocation - $5,000)
    26             (Design and Contingencies - $80,000)
    27         (14)  Kimmell Township, County Bridge No.3
    28             over Beaverdam Creek, Bridge
    29             Replacement                                   490,000
    30             (Base Construction Allocation -
    19990S0504B1471                 - 79 -

     1             $380,000)
     2             (Land Allocation - $20,000)
     3             (Design and Contingencies - $90,000)
     4         (15)  Hopewell Township, County Bridge No.4
     5             over Yellow Creek, Bridge Replacement         970,000
     6             (Base Construction Allocation -
     7             $800,000)
     8             (Land Allocation - $20,000)
     9             (Design and Contingencies - $150,000)
    10         (16)  Colerain Township, Bridge No.2,
    11             Bridge Replacement                            445,000
    12             (Base Construction Allocation -
    13             $350,000)
    14             (Land Allocation - $5,000)
    15             (Design and Contingencies - $90,000)
    16         (17)  Bedford Borough, Bridge No.1 over
    17             Shober's Run, Bridge Replacement              800,000
    18             (Base Construction Allocation -
    19             $640,000)
    20             (Land Allocation - $10,000)
    21             (Design and Contingencies - $150,000)
    22         (18)  West St. Clair Township, Township
    23             Bridge No.8 over Branch of Dunning
    24             Creek, Bridge Replacement                     480,000
    25             (Base Construction Allocation -
    26             $350,000)
    27             (Land Allocation - $5,000)
    28             (Design and Contingencies - $125,000)
    29         (19)  Londonderry Township, T-669, Gladden
    30             Pike Bridge Over Gladden's Run, Bridge
    19990S0504B1471                 - 80 -

     1             Replacement                                   395,000  <--
     2             (Base Construction Allocation -
     3             $300,000)
     4             (Land Allocation - $85,000)
     5             (Design and Contingencies - $10,000)
     6             REPLACEMENT                                   430,000  <--
     7             (BASE CONSTRUCTION ALLOCATION -
     8             $335,000)
     9             (LAND ALLOCATION - $10,000)
    10             (DESIGN AND CONTINGENCIES - $85,000)
    11         (20)  Everett Borough, Bridge No.1 over
    12             Bloody Run, Bridge Replacement                571,000
    13             (Base Construction Allocation -
    14             $400,000)
    15             (Land Allocation - $1,000)
    16             (Design and Contingencies - $170,000)
    17     (b)  State Bridges
    18         (1)  SR 0220, US 220, Northbound Bridge
    19             over Pennsylvania Turnpike, Bedford
    20             Township, Bridge Painting                     180,000
    21             (Base Construction Allocation -
    22             $150,000)
    23             (Design and Contingencies - $30,000)
    24         (2)  SR 0220, US 220, Southbound Bridge
    25             over Pennsylvania Turnpike, Bedford
    26             Township, Bridge Painting                     170,000
    27             (Base Construction Allocation -
    28             $140,000)
    29             (Design and Contingencies - $30,000)
    30         (3)  SR 0869, Wallachs Bridge over Wallachs
    19990S0504B1471                 - 81 -

     1             Branch, Pavia Township, Bridge
     2             Replacement                                   455,000
     3             (Base Construction Allocation -
     4             $325,000)
     5             (Land Allocation - $25,000)
     6             (Design and Contingencies - $105,000)
     7         (4)  SR 3019, Kegg Run Bridge over Kegg
     8             Run, Juniata Township, Bridge
     9             Replacement                                   655,000
    10             (Base Construction Allocation -
    11             $495,000)
    12             (Land Allocation - $25,000)
    13             (Design and Contingencies - $135,000)
    14         (5)  SR 2006, Sidling Hill Bridge over East
    15             Branch Sidling Hill Creek, Monroe
    16             Township, Bridge Replacement                  750,000
    17             (Base Construction Allocation -
    18             $580,000)
    19             (Land Allocation - $25,000)
    20             (Design and Contingencies - $145,000)
    21         (6)  SR 3008, Bridge over Tributary of
    22             Little Wills Creek, Juniata Township,
    23             Bridge Rehabilitation                          96,000
    24             (Base Construction Allocation -
    25             $78,000)
    26             (Land Allocation - $2,000)
    27             (Design and Contingencies - $16,000)
    28         (7)  SR 3017, Cove Run Bridge over Cove
    29             Run, Harrison Township, Bridge
    30             Rehabilitation                                110,000
    19990S0504B1471                 - 82 -

     1             (Base Construction Allocation -
     2             $90,000)
     3             (Land Allocation - $2,000)
     4             (Design and Contingencies - $18,000)
     5         (8)  SR 4034, Bridge over I-99/US 220, King
     6             Township, Bridge Painting                     275,000
     7             (Base Construction Allocation -
     8             $250,000)
     9             (Land Allocation - $5,000)
    10             (Design and Contingencies - $20,000)
    11  Section 10.  Berks County.
    12     (a)  Local Bridges
    13         (1)  City of Reading, Fritz Island Bridge
    14             over Angelica Creek, Bridge
    15             Rehabilitation                                 23,000
    16             (Base Construction Allocation -
    17             $20,000)
    18             (Design and Contingencies - $3,000)
    19         (2)  City of Reading, Bernadine Street over
    20             Angelica Creek, Bridge Rehabilitation         175,000
    21             (Base Construction Allocation -
    22             $145,000)
    23             (Design and Contingencies - $30,000)
    24         (3)  City of Reading, Tulpehocken Street
    25             Footbridge, Bridge Rehabilitation               6,000
    26             (Base Construction Allocation - $5,000)
    27             (Design and Contingencies - $1,000)
    28         (4)  West Reading Borough, Museum Road over
    29             Wyomissing Creek, Bridge
    30             Rehabilitation                                 15,000
    19990S0504B1471                 - 83 -

     1             (Base Construction Allocation -
     2             $12,000)
     3             (Design and Contingencies - $3,000)
     4         (5)  Amity Township, Lake Drive over
     5             Tributary of Schuylkill River, Bridge
     6             Rehabilitation                                 86,000
     7             (Base Construction Allocation -
     8             $75,000)
     9             (Design and Contingencies - $11,000)
    10         (6)  Amity Township, Browns Mill Road over
    11             Spring Creek, Bridge Rehabilitation             6,000
    12             (Base Construction Allocation - $5,000)
    13             (Design and Contingencies - $1,000)
    14         (7)  Amity Township, Valley Road over
    15             Spring Creek, Bridge Rehabilitation            10,000
    16             (Base Construction Allocation - $8,000)
    17             (Design and Contingencies - $2,000)
    18         (8)  Amity Township, Monocacy Road over
    19             Monocacy Creek, Bridge Rehabilitation          11,000
    20             (Base Construction Allocation - $9,000)
    21             (Design and Contingencies - $2,000)
    22         (9)  Bethel Township, T-492 over Little
    23             Swatara Creek, Bridge Replacement             700,000
    24             (Base Construction Allocation -
    25             $500,000)
    26             (Land Allocation - $50,000)
    27             (Design and Contingencies - $150,000)
    28         (10)  Bethel Township, T-682 over Crosskill
    29             Creek, Bridge Replacement                     750,000
    30             (Base Construction Allocation -
    19990S0504B1471                 - 84 -

     1             $550,000)
     2             (Land Allocation - $50,000)
     3             (Design and Contingencies - $150,000)
     4         (11)  Lenhartsville Borough, Penn Avenue
     5             over Maiden Creek, Bridge Replacement         960,000
     6             (Base Construction Allocation -
     7             $750,000)
     8             (Land Allocation - $10,000)
     9             (Design and Contingencies - $200,000)
    10         (12)  Mohnton Borough, Main Street over
    11             Wyomissing Creek, Bridge Replacement          750,000
    12             (Base Construction Allocation -
    13             $550,000)
    14             (Land Allocation - $50,000)
    15             (Design and Contingencies - $150,000)
    16         (13)  Muhlenberg Township, Hain Avenue over
    17             Laurel Run, Bridge Rehabilitation             100,000
    18             (Base Construction Allocation -
    19             $80,000)
    20             (Design and Contingencies - $20,000)
    21         (14)  Oley Township, T-500 over Furnace
    22             Creek, Bridge Replacement                     700,000
    23             (Base Construction Allocation -
    24             $500,000)
    25             (Land Allocation - $50,000)
    26             (Design and Contingencies - $150,000)
    27         (15)  Robesonia Borough, Freeman Street
    28             over Furnace Creek, Bridge Replacement        700,000
    29             (Base Construction Allocation -
    30             $500,000)
    19990S0504B1471                 - 85 -

     1             (Land Allocation - $50,000)
     2             (Design and Contingencies - $150,000)
     3         (16)  Washington Township, T-884 over Swamp
     4             Creek, Bridge Replacement                     700,000
     5             (Base Construction Allocation -
     6             $500,000)
     7             (Land Allocation - $50,000)
     8             (Design and Contingencies - $150,000)
     9         (17)  Upper Bern Township, Mill Hill Road,
    10             T-712 over Mill Creek, Bridge
    11             Replacement                                    70,000
    12             (Base Construction Allocation -
    13             $40,000)
    14             (Land Allocation - $10,000)
    15             (Design and Contingencies - $20,000)
    16         (18)  North Heidelberg Township, T-501,
    17             Milestone Road Bridge over Tributary of
    18             Spring Creek, Bridge Replacement               94,000
    19             (Base Construction Allocation -
    20             $82,000)
    21             (Land Allocation - $4,000)
    22             (Design and Contingencies - $8,000)
    23         (19)  Robeson Township, T-366, Bridge over
    24             Allegheny Creek, Bridge Replacement           133,000
    25             (Base Construction Allocation -
    26             $117,000)
    27             (Land Allocation - $5,000)
    28             (Design and Contingencies - $11,000)
    29         (20)  BERN TOWNSHIP, MITCHELL ROAD OVER                    <--
    30             LEITZ'S BRIDGE TO READING REGIONAL
    19990S0504B1471                 - 86 -

     1             AIRPORT, BRIDGE REPLACEMENT                 1,000,000
     2         (21)  SOUTH HEIDELBERG TOWNSHIP, T-388,
     3             KRICK LANE OVER CONRAIL, NEW BRIDGE         2,750,000
     4             (BASE CONSTRUCTION ALLOCATION -
     5             $2,000,000)
     6             (LAND ALLOCATION - $250,000)
     7             (DESIGN AND CONTINGENCIES - $500,000)
     8         (22)  COLEBROOKDALE TOWNSHIP, T-621,
     9             TOWNSHIP LINE ROAD OVER SWAMP CREEK,
    10             BRIDGE REPLACEMENT                            300,000
    11     (b)  State Bridges
    12         (1)  SR 0010, Reading Road over Tributary
    13             of Conestoga Creek, Caernarvon
    14             Township, Bridge Rehabilitation               775,000
    15             (Base Construction Allocation -
    16             $490,000)
    17             (Land Allocation - $100,000)
    18             (Design and Contingencies - $185,000)
    19         (2)  SR 0222, SR 0222 Northbound over SR
    20             0737 Exit, Maxatawny Township, Bridge
    21             Painting                                       45,000
    22             (Base Construction Allocation -
    23             $45,000)
    24         (3)  SR 0222, North Elm Street over SR
    25             0222, Kutztown Borough, Bridge
    26             Painting                                       45,000
    27             (Base Construction Allocation -
    28             $45,000)
    29         (4)  SR 0222, SR 0222 Northbound over SR
    30             8015, Ramp G, Maxatawny Township,
    19990S0504B1471                 - 87 -

     1             Bridge Painting                                45,000
     2             (Base Construction Allocation -
     3             $45,000)
     4         (5)  SR 0222, SR 0222 Southbound over SR
     5             8015, Ramp G, Maxatawny Township,
     6             Bridge Painting                                45,000
     7             (Base Construction Allocation -
     8             $45,000)
     9         (6)  SR 2038, Grist Mill Road over
    10             Ironstone Creek, Douglass Township,
    11             Bridge Replacement                            405,000
    12             (Base Construction Allocation -
    13             $235,000)
    14             (Land Allocation - $70,000)
    15             (Design and Contingencies - $100,000)
    16         (7)  SR 0073, Bridge over Railroad, Maiden
    17             Creek Township, Bridge Rehabilitation          14,000
    18             (Base Construction Allocation -
    19             $12,000)
    20             (Design and Contingencies - $2,000)
    21         (8)  SR 2014, Spring Street Subway, City of
    22             Reading, Bridge Rehabilitation                 18,000
    23             (Base Construction Allocation -
    24             $15,000)
    25             (Design and Contingencies - $3,000)
    26         (9)  SR 0073, SR 0073 over Manatawny Creek,
    27             Oley Township, Bridge Rehabilitation          500,000
    28             (Base Construction Allocation -
    29             $450,000)
    30             (Design and Contingencies - $50,000)
    19990S0504B1471                 - 88 -

     1         (10)  SR 0061, SR 0061 over Blue Mountain
     2             Railroad, Borough of Hamburg, Bridge
     3             Rehabilitation                                200,000
     4             (Base Construction Allocation -
     5             $175,000)
     6             (Design and Contingencies - $25,000)
     7         (11)  SR 0078, SR 0078 over SR 1024,
     8             Greenwich Township, Bridge
     9             Rehabilitation                                500,000
    10             (Base Construction Allocation -
    11             $450,000)
    12             (Design and Contingencies - $50,000)
    13         (12)  SR 0078, SR 0078 over T-808, Windsor
    14             Township, Bridge Rehabilitation               500,000
    15             (Base Construction Allocation -
    16             $450,000)
    17             (Design and Contingencies - $50,000)
    18         (13)  SR 0078, SR 0078 over Fifth Street,
    19             Borough of Hamburg, Bridge
    20             Rehabilitation                                200,000
    21             (Base Construction Allocation -
    22             $175,000)
    23             (Design and Contingencies - $25,000)
    24         (14)  SR 0078, SR 0078 over T-688, Bethel
    25             Township, Bridge Rehabilitation               250,000
    26             (Base Construction Allocation -
    27             $225,000)
    28             (Design and Contingencies - $25,000)
    29         (15)  SR 0176, SR 0176 over T-568, Robeson
    30             Township, Bridge Rehabilitation               250,000
    19990S0504B1471                 - 89 -

     1             (Base Construction Allocation -
     2             $200,000)
     3             (Design and Contingencies - $50,000)
     4         (16)  SR 0176, SR 0176 2/10 mile south of
     5             SR 0422, Cumru Township, Bridge
     6             Rehabilitation                                350,000
     7             (Base Construction Allocation -
     8             $300,000)
     9             (Design and Contingencies - $50,000)
    10         (17)  SR 1083, SR 0183 over Little
    11             Northkill Creek, Jefferson Township,
    12             Bridge Replacement                          1,000,000
    13             (Base Construction Allocation -
    14             $750,000)
    15             (Land Allocation - $100,000)
    16             (Design and Contingencies - $150,000)
    17         (18)  SR 0222, SR 0222 over Abandoned
    18             Railroad, City of Reading, Bridge
    19             Rehabilitation                                200,000
    20             (Base Construction Allocation -
    21             $150,000)
    22             (Design and Contingencies - $50,000)
    23         (19)  SR 0422, SR 0422 over Tulpehocken
    24             Creek, Borough of Womelsdorf, Bridge
    25             Rehabilitation                                200,000
    26             (Base Construction Allocation -
    27             $150,000)
    28             (Design and Contingencies - $50,000)
    29         (20)  SR 0568, SR 0568 over Allegheny
    30             Creek, Robeson Township, Bridge
    19990S0504B1471                 - 90 -

     1             Rehabilitation                                100,000
     2             (Base Construction Allocation -
     3             $80,000)
     4             (Design and Contingencies - $20,000)
     5         (21)  SR 0737, SR 0737 2.63 miles north of
     6             Kutztown, Greenwich Township, Bridge
     7             Rehabilitation                                500,000
     8             (Base Construction Allocation -
     9             $450,000)
    10             (Design and Contingencies - $50,000)
    11         (22)  SR 0737, SR 0737 2.82 miles north of
    12             Kutztown, Greenwich Township, Bridge
    13             Rehabilitation                                500,000
    14             (Base Construction Allocation -
    15             $450,000)
    16             (Design and Contingencies - $50,000)
    17         (23)  SR 2025, SR 2025 1/2 mile east of SR
    18             0422, Amity Township, Bridge
    19             Replacement                                   300,000
    20             (Base Construction Allocation -
    21             $200,000)
    22             (Land Allocation - $15,000)
    23             (Design and Contingencies - $85,000)
    24         (24)  SR 2031, SR 2031 over Hay Creek,
    25             Robeson Township, Bridge
    26             Rehabilitation                                500,000
    27             (Base Construction Allocation -
    28             $450,000)
    29             (Design and Contingencies - $50,000)
    30         (25)  SR 2032, SR 2032 over Tributary of
    19990S0504B1471                 - 91 -

     1             Swamp Creek, Washington Township,
     2             Bridge Replacement                            500,000
     3             (Base Construction Allocation -
     4             $375,000)
     5             (Land Allocation - $25,000)
     6             (Design and Contingencies - $100,000)
     7         (26)  SR 2039, SR 2039 over SR 0422, Exeter
     8             Township, Bridge Replacement                2,750,000
     9             (Base Construction Allocation -
    10             $2,000,000)
    11             (Land Allocation - $250,000)
    12             (Design and Contingencies - $500,000)
    13         (27)  SR 2041, SR 2041 2 miles west of
    14             Weavertown, Amity Township, Bridge
    15             Replacement                                   200,000
    16             (Base Construction Allocation -
    17             $125,000)
    18             (Land Allocation - $15,000)
    19             (Design and Contingencies - $60,000)
    20         (28)  SR 2057, SR 2057 over Leaf Creek,
    21             Amity Township, Bridge Replacement            600,000
    22             (Base Construction Allocation -
    23             $425,000)
    24             (Land Allocation - $25,000)
    25             (Design and Contingencies - $150,000)
    26         (29)  SR 3003, SR 3003 over Angelica Creek,
    27             Cumru Township, Bridge Replacement            200,000
    28             (Base Construction Allocation -
    29             $125,000)
    30             (Land Allocation - $15,000)
    19990S0504B1471                 - 92 -

     1             (Design and Contingencies - $60,000)
     2         (30)  SR 4026, SR 4026 over Irish Creek,
     3             Borough of Centerport, Bridge
     4             Rehabilitation                                250,000
     5             (Base Construction Allocation -
     6             $225,000)
     7             (Design and Contingencies - $25,000)
     8         (31)  SR 0073, Bridge over Maiden Creek,
     9             Ontelaunee Township, Bridge
    10             Replacement                                 2,120,000
    11             (Base Construction Allocation -
    12             $2,000,000)
    13             (Land Allocation - $20,000)
    14             (Design and Contingencies - $100,000)
    15         (32)  SR 2021, Mineral Spring Road,
    16             Lindbergh Viaduct, City of Reading,
    17             Bridge Rehabilitation                       4,000,000
    18         (33)  SR 0222, US 222 Bridge Painting,
    19             Seven Structures, Kutztown, West
    20             Reading and Maxatawny, Bridge Painting      1,000,000
    21             (Base Construction Allocation -
    22             $1,000,000)
    23         (34)  SR 0422, Reading Bypass Bridges over
    24             Schuylkill River and US 222, Six Bridge
    25             Rehabilitations with Latex, City of
    26             Reading, Bridge Deck Rehabilitation         5,050,000
    27             (Base Construction Allocation -
    28             $5,000,000)
    29             (Design and Contingencies - $50,000)
    30  Section 11.  Blair County.
    19990S0504B1471                 - 93 -

     1     (a)  Local Bridges
     2         (1)  Antis Township, T-490, Becker Road
     3             Bridge over Tributary of Little Juniata
     4             River, Bridge Replacement                     310,000
     5             (Base Construction Allocation -
     6             $250,000)
     7             (Land Allocation - $10,000)
     8             (Design and Contingencies - $50,000)
     9         (2)  Taylor Township, T-332, Halter Creek
    10             Bridge over Halter Creek, Bridge
    11             Replacement                                   395,000
    12             (Base Construction Allocation -
    13             $300,000)
    14             (Land Allocation - $10,000)
    15             (Design and Contingencies - $85,000)
    16         (3)  Greenfield Township, T-531 over South
    17             Poplar Run, Construct new bridge              280,000
    18             (Base Construction Allocation -
    19             $200,000)
    20             (Land Allocation - $20,000)
    21             (Design and Contingencies - $60,000)
    22         (4)  Greenfield Township, T-531 over Big
    23             Lick Branch of South Poplar Run, Bridge
    24             Replacement                                   565,000
    25             (Base Construction Allocation -
    26             $465,000)
    27             (Land Allocation - $30,000)
    28             (Design and Contingencies - $70,000)
    29         (5)  Greenfield Township, County Road 101
    30             over Polecat Run, Bridge Replacement          520,000
    19990S0504B1471                 - 94 -

     1             (Base Construction Allocation -
     2             $400,000)
     3             (Land Allocation - $20,000)
     4             (Design and Contingencies - $100,000)
     5         (6)  Newry Borough, Allegheny Street over
     6             Tributary of Poplar Run, Bridge
     7             Rehabilitation                                425,000
     8             (Base Construction Allocation -
     9             $350,000)
    10             (Land Allocation - $25,000)
    11             (Design and Contingencies - $50,000)
    12         (7)  Allegheny Township, Ellenberger Road,
    13             Quarry Bridge over Mill Run Creek,
    14             Bridge Replacement                            319,000
    15             (Base Construction Allocation -
    16             $277,000)
    17             (Design and Contingencies - $42,000)
    18         (8)  City of Altoona, Beale Avenue, Bridge
    19             over Mill Run Creek, Bridge
    20             Replacement                                   380,000
    21             (Base Construction Allocation -
    22             $330,000)
    23             (Design and Contingencies - $50,000)
    24         (9)  City of Altoona, Broad Avenue, Bridge
    25             over Mill Run Creek, Bridge
    26             Replacement                                   317,000
    27             (Base Construction Allocation -
    28             $275,000)
    29             (Design and Contingencies - $42,000)
    30         (10)  City of Altoona, Hite Company Access,
    19990S0504B1471                 - 95 -

     1             Bridge over Mill Run Creek, Bridge
     2             Replacement                                   118,000  <--
     3             (Base Construction Allocation -
     4             $101,000)
     5             REPLACEMENT                                   127,000  <--
     6             (BASE CONSTRUCTION ALLOCATION -
     7             $110,000)
     8             (Design and Contingencies - $17,000)
     9         (11)  City of Altoona, 31st Street, Conrail
    10             No.1 Bridge over Mill Run Creek, Bridge
    11             Replacement                                   160,000  <--
    12             (Base Construction Allocation -
    13             $139,000)
    14             REPLACEMENT                                   170,000  <--
    15             (BASE CONSTRUCTION ALLOCATION -
    16             $149,000)
    17             (Design and Contingencies - $21,000)
    18         (12)  City of Altoona, West Chestnut
    19             Avenue, Bridge over Mill Run Creek,
    20             Bridge Replacement                            285,000
    21             (Base Construction Allocation -
    22             $248,000)
    23             (Design and Contingencies - $37,000)
    24         (13)  City of Altoona, Spruce Avenue,
    25             Bridge over Mill Run Creek, Bridge
    26             Replacement                                   285,000
    27             (Base Construction Allocation -
    28             $248,000)
    29             (Design and Contingencies - $37,000)
    30         (14)  City of Altoona, Coleridge Avenue,
    19990S0504B1471                 - 96 -

     1             Bridge over Mill Run Creek, Bridge
     2             Replacement                                   570,000
     3             (Base Construction Allocation -
     4             $495,000)
     5             (Design and Contingencies - $75,000)
     6     (b)  State bridges
     7         (1)  SR 0022, Canal Park Bridges over the
     8             Juniata River, Hollidaysburg Borough,
     9             Bridge Replacement                          3,000,000
    10             (Base Construction Allocation -
    11             $2,000,000)
    12             (Land Allocation - $650,000)
    13             (Design and Contingencies - $350,000)
    14         (2)  SR 4008, SR 4008 over Tributary of
    15             Glenwhite Run, Logan Township, Bridge
    16             Replacement                                   240,000
    17             (Base Construction Allocation -
    18             $200,000)
    19             (Land Allocation - $5,000)
    20             (Design and Contingencies - $35,000)
    21         (3)  SR 4004, 58th Street Bridge over Mill
    22             Run Creek, City of Altoona, Bridge
    23             Replacement                                   598,000  <--
    24             (Base Construction Allocation -
    25             $520,000)
    26             (Design and Contingencies - $78,000)
    27             REPLACEMENT                                   758,000  <--
    28             (BASE CONSTRUCTION ALLOCATION -
    29             $658,000)
    30             (DESIGN AND CONTINGENCIES - $100,000)
    19990S0504B1471                 - 97 -

     1         (4)  SR 4003, Logan Boulevard Bridge over
     2             Mill Run Creek, City of Altoona, Bridge
     3             Replacement                                 1,438,000
     4             (Base Construction Allocation -
     5             $1,250,000)
     6             (Design and Contingencies - $188,000)
     7         (5)  SR 0036, Union Avenue Bridge over Mill
     8             Run Creek, City of Altoona, Bridge
     9             Replacement                                   770,000
    10             (Base Construction Allocation -
    11             $670,000)
    12             (Design and Contingencies - $100,000)
    13         (6)  SR 4029, Bridge over Schell Run,
    14             Tyrone Borough, Bridge Rehabilitation         120,000
    15             (Base Construction Allocation -
    16             $90,000)
    17             (Land Allocation - $1,000)
    18             (Design and Contingencies - $29,000)
    19         (7)  SR 0164, Bridge over Dry Run, Freedom
    20             Township, Bridge Replacement                1,030,000
    21             (Base Construction Allocation -
    22             $900,000)
    23             (Land Allocation - $85,000)
    24             (Design and Contingencies - $45,000)
    25         (8)  SR 4004, CALIFORNIA AVENUE BRIDGE OVER                <--
    26             BURGOON RUN, ALLEGHENY TOWNSHIP               356,000
    27             (BASE CONSTRUCTION ALLOCATION -
    28             $309,000)
    29             (DESIGN AND CONTINGENCIES - $47,000)
    30         (9)  SR 1013, SINKING VALLEY, BLAIR COUNTY,
    19990S0504B1471                 - 98 -

     1             IMPROVE THREE DRAINAGE STRUCTURES ON
     2             STATE ROUTE 1013, AT SEGMENT 270
     3             (OFFSET 0000), SEGMENT 270 (OFFSET
     4             1920) AND SEGMENT 290 (OFFSET 1774)         1,500,000
     5             (BASE CONSTRUCTION ALLOCATION -
     6             $1,125,000)
     7             (LAND ALLOCATION - $25,000)
     8             (DESIGN AND CONTINGENCIES - $300,000)
     9  Section 12.  Bradford County.
    10     (a)  Local Bridges
    11         (1)  Burlington Township, T-547 over Wallis
    12             Run, Bridge Replacement                       395,000
    13             (Base Construction Allocation -
    14             $310,000)
    15             (Land Allocation - $10,000)
    16             (Design and Contingencies - $75,000)
    17         (2)  Pike Township, T-790 over Gaylord
    18             Creek and South Creek, Bridge
    19             Replacement                                   495,000
    20             (Base Construction Allocation -
    21             $410,000)
    22             (Land Allocation - $10,000)
    23             (Design and Contingencies - $75,000)
    24         (3)  Canton Township, T-889, County Bridge
    25             No.45 over Towanda Creek, Bridge
    26             Replacement                                   480,000
    27             (Base Construction Allocation -
    28             $400,000)
    29             (Land Allocation - $25,000)
    30             (Design and Contingencies - $55,000)
    19990S0504B1471                 - 99 -

     1         (4)  Tuscarora Township, T-874, County
     2             Bridge No.36 over Fargo Creek, Bridge
     3             Replacement                                   265,000
     4             (Base Construction Allocation -
     5             $215,000)
     6             (Land Allocation - $15,000)
     7             (Design and Contingencies - $35,000)
     8         (5)  Franklin Township, T-358, County
     9             Bridge No.12 over Towanda Creek, Bridge
    10             Replacement                                 1,020,000
    11             (Base Construction Allocation -
    12             $850,000)
    13             (Land Allocation - $50,000)
    14             (Design and Contingencies - $120,000)
    15         (6)  Litchfield Township, T-900, Parks
    16             Creek Structure Bridge over Parks
    17             Creek, Bridge Replacement                     390,000
    18             (Base Construction Allocation -
    19             $220,000)
    20             (Land Allocation - $20,000)
    21             (Design and Contingencies - $150,000)
    22         (7)  Albany Township, T-377, Bridge over
    23             Bowman Creek                                  390,000
    24             (Base Construction Allocation -
    25             $250,000)
    26             (Land Allocation - $10,000)
    27             (Design and Contingencies - $130,000)
    28         (8)  Towanda Township, T-545, Bridge over
    29             Sugar Creek, Bridge Replacement             1,247,000
    30             (Base Construction Allocation -
    19990S0504B1471                 - 100 -

     1             $1,033,000)
     2             (Land Allocation - $65,000)
     3             (Design and Contingencies - $149,000)
     4         (9)  Wells Township, T-763, Bridge over
     5             Seely Creek, Bridge Replacement               428,000
     6             (Base Construction Allocation -
     7             $355,000)
     8             (Land Allocation - $22,000)
     9             (Design and Contingencies - $51,000)
    10         (10)  Terry Township, T-420, Bridge over
    11             Foster Branch of Sugar Creek, Bridge
    12             Replacement                                   663,000
    13             (Base Construction Allocation -
    14             $550,000)
    15             (Land Allocation - $33,000)
    16             (Design and Contingencies - $80,000)
    17         (11)  Canton Township, T-889, County Bridge
    18             No.45 over Towanda Creek, Bridge
    19             Replacement                                   480,000
    20             (Base Construction Allocation -
    21             $400,000)
    22             (Land Allocation - $25,000)
    23             (Design and Contingencies - $55,000)
    24         (12)  Tuscarora Township, T-874, County
    25             Bridge No.36 over Fargo Creek, Bridge
    26             Replacement                                   265,000
    27             (Base Construction Allocation -
    28             $215,000)
    29             (Land Allocation - $15,000)
    30             (Design and Contingencies - $35,000)
    19990S0504B1471                 - 101 -

     1         (13)  Franklin Township, T-358, County
     2             Bridge No.12 over Towanda Creek, Bridge
     3             Replacement                                 1,020,000
     4             (Base Construction Allocation -
     5             $850,000)
     6             (Land Allocation - $50,000)
     7             (Design and Contingencies - $120,000)
     8         (14)  Litchfield Township, T-900 over Parks
     9             Creek, Parks Creek Structure Bridge,
    10             Bridge Replacement                            390,000
    11             (Base Construction Allocation -
    12             $220,000)
    13             (Land Allocation - $20,000)
    14             (Design and Contingencies - $150,000)
    15         (15)  Albany Township, T-381, County Bridge
    16             No.2 over South Branch of Towanda
    17             Creek, Bridge Replacement                     550,000
    18             (Base Construction Allocation -
    19             $495,000)
    20             (Design and Contingencies - $55,000)
    21         (16)  Monroe Township, T-412, County Bridge
    22             No.20 over South Branch of Towanda
    23             Creek, Bridge Replacement                     700,000
    24             (Base Construction Allocation -
    25             $630,000)
    26             (Design and Contingencies - $70,000)
    27         (17)  Granville Township, T-326, Bridge
    28             over North Branch Towanda Creek, Bridge
    29             Replacement                                   700,000
    30             (Base Construction Allocation -
    19990S0504B1471                 - 102 -

     1             $575,000)
     2             (Land Allocation - $25,000)
     3             (Design and Contingencies - $100,000)
     4         (18)  Monroe Township, T-402, South Bridge
     5             over Towanda Creek, Bridge Replacement      1,080,000
     6             (Base Construction Allocation -
     7             $900,000)
     8             (Land Allocation - $30,000)
     9             (Design and Contingencies - $150,000)
    10         (19)  North Towanda Township, T-545, Bridge
    11             over Sugar Creek, Bridge Replacement        1,140,000
    12             (Base Construction Allocation -
    13             $960,000)
    14             (Land Allocation - $30,000)
    15             (Design and Contingencies - $150,000)
    16         (20)  GRANVILLE TOWNSHIP, T-361, BRIDGE                    <--
    17             OVER NORTH BRANCH OF TOWANDA CREEK,
    18             BRIDGE REPLACEMENT                            400,000
    19             (BASE CONSTRUCTION ALLOCATION -
    20             $280,000)
    21             (LAND ALLOCATION - $20,000)
    22             (DESIGN AND CONTINGENCIES - $100,000)
    23         (21)  NORTH TOWANDA TOWNSHIP, T-892, SUGAR
    24             CREEK BIKE/PEDESTRIAN BRIDGE, BRIDGE
    25             REPLACEMENT                                   320,000
    26             (BASE CONSTRUCTION ALLOCATION -
    27             $200,000)
    28             (LAND ALLOCATION - $20,000)
    29             (DESIGN AND CONTINGENCIES - $100,000)
    30     (b)  State Bridges
    19990S0504B1471                 - 103 -

     1         (1)  SR 0006, North Bridge over Sugar
     2             Creek, South of Longs Pond Road, Bridge
     3             Replacement                                 1,139,000
     4             (Base Construction Allocation -
     5             $911,000)
     6             (Land Allocation - $57,000)
     7             (Design and Contingencies - $171,000)
     8         (2)  SR 0409, Billing Creek Bridge, Village
     9             of Camptown, Bridge Replacement               318,000
    10             (Base Construction Allocation -
    11             $254,000)
    12             (Land Allocation - $16,000)
    13             (Design and Contingencies - $48,000)
    14         (3)  SR 3029, Towanda Creek Bridges between
    15             T-327 and T-326 on Gulf Road, Village
    16             of Granville Center, Bridge
    17             Replacement                                   593,000
    18             (Base Construction Allocation -
    19             $474,000)
    20             (Land Allocation - $30,000)
    21             (Design and Contingencies - $89,000)
    22         (4)  SR 4008, Bridge over Tributary of
    23             Sugar Creek, Columbia Township, Bridge
    24             Replacement                                   298,000
    25             (Base Construction Allocation -
    26             $238,000)
    27             (Land Allocation - $15,000)
    28             (Design and Contingencies - $45,000)
    29         (5)  SR 0414, Bridge over Towanda Creek,
    30             Bradford Borough, Bridge Painting             195,000
    19990S0504B1471                 - 104 -

     1             (Base Construction Allocation -
     2             $185,000)
     3             (Design and Contingencies - $10,000)
     4         (6)  US 6, US 6 over Sugar Creek, Sylvania
     5             Borough, Bridge Replacement                   633,000
     6             (Base Construction Allocation -
     7             $506,000)
     8             (Land Allocation - $32,000)
     9             (Design and Contingencies - $95,000)
    10         (7)  SR 0014, SR 0014 over Tributary of
    11             Sugar Creek, Troy Township, Bridge
    12             Replacement                                   410,000
    13             (Base Construction Allocation -
    14             $280,000)
    15             (Land Allocation - $30,000)
    16             (Design and Contingencies - $100,000)
    17         (8)  SR 0187, SR 0187 over Wappasening
    18             Creek, Windham Township, Bridge
    19             Replacement                                 2,000,000
    20             (Base Construction Allocation -
    21             $1,600,000)
    22             (Land Allocation - $100,000)
    23             (Design and Contingencies - $300,000)
    24         (9)  SR 0414, SR 0414 over Tributary of
    25             Towanda Creek, Canton Township, Bridge
    26             Replacement                                   320,000
    27             (Base Construction Allocation -
    28             $256,000)
    29             (Land Allocation - $16,000)
    30             (Design and Contingencies - $48,000)
    19990S0504B1471                 - 105 -

     1         (10)  SR 0467, SR 0467 over Johnsons Creek,
     2             Orwell Township, Bridge Replacement           751,000
     3             (Base Construction Allocation -
     4             $601,000)
     5             (Land Allocation - $37,000)
     6             (Design and Contingencies - $113,000)
     7         (11)  SR 0514, SR 0514 over North Branch of
     8             Towanda Creek, Granville Township,
     9             Bridge Replacement                            638,000
    10             (Base Construction Allocation -
    11             $510,000)
    12             (Land Allocation - $32,000)
    13             (Design and Contingencies - $96,000)
    14         (12)  SR 1022, Ulster Bridge, Ulster
    15             Township, Bridge Painting                   6,299,000
    16             (Base Construction Allocation -
    17             $5,039,000)
    18             (Land Allocation - $315,000)
    19             (Design and Contingencies - $945,000)
    20         (13)  SR 1026, SR 1026 over Wyalusing
    21             Creek, Pike Township, Bridge
    22             Replacement                                   650,000
    23             (Base Construction Allocation -
    24             $520,000)
    25             (Land Allocation - $30,000)
    26             (Design and Contingencies - $100,000)
    27         (14)  SR 1049, SR 1049 over Tributary of
    28             Pendleton Creek, Warren Township,
    29             Bridge Replacement                            340,000
    30             (Base Construction Allocation -
    19990S0504B1471                 - 106 -

     1             $270,000)
     2             (Land Allocation - $15,000)
     3             (Design and Contingencies - $55,000)
     4         (15)  SR 1055, SR 1055 over Parks Creek,
     5             Rome Township, Bridge Replacement             315,000
     6             (Base Construction Allocation -
     7             $250,000)
     8             (Land Allocation - $15,000)
     9             (Design and Contingencies - $50,000)
    10         (16)  SR 2018, SR 2018 over Tributary of
    11             Susquehanna River, Asylum Township,
    12             Bridge Replacement                            260,000
    13             (Base Construction Allocation -
    14             $208,000)
    15             (Land Allocation - $39,000)
    16             (Design and Contingencies - $13,000)
    17         (17)  SR 3005, SR 3005 over Towanda Creek,
    18             Canton Township, Bridge Replacement           666,000
    19             (Base Construction Allocation -
    20             $533,000)
    21             (Land Allocation - $33,000)
    22             (Design and Contingencies - $100,000)
    23         (18)  SR 3029, SR 3029 over Mud Creek, Troy
    24             Township, Bridge Replacement                  457,000
    25             (Base Construction Allocation -
    26             $366,000)
    27             (Land Allocation - $23,000)
    28             (Design and Contingencies - $68,000)
    29         (19)  SR 4002, SR 4002 over Browns Creek,
    30             Burlington Township, Bridge
    19990S0504B1471                 - 107 -

     1             Replacement                                   561,000
     2             (Base Construction Allocation -
     3             $449,000)
     4             (Land Allocation - $28,000)
     5             (Design and Contingencies - $84,000)
     6         (20)  SR 4013, SR 4013 over Justice Run,
     7             Ridgebury Township, Bridge Replacement        351,000
     8             (Base Construction Allocation -
     9             $281,000)
    10             (Land Allocation - $18,000)
    11             (Design and Contingencies - $52,000)
    12         (21)  SR 4014, SR 4014 over Branch of
    13             Tomjack Creek, Smithfield Township,
    14             Bridge Replacement                            360,000
    15             (Base Construction Allocation -
    16             $288,000)
    17             (Land Allocation - $18,000)
    18             (Design and Contingencies - $54,000)
    19         (22)  SR 4015, SR 4015 over Mill Creek,
    20             Springfield Township, Bridge
    21             Replacement                                   390,000
    22             (Base Construction Allocation -
    23             $312,000)
    24             (Land Allocation - $20,000)
    25             (Design and Contingencies - $58,000)
    26         (23)  SR 4031, SR 4031 over Tributary of
    27             Beckwith Creek, Wells Township, Bridge
    28             Replacement                                   243,000
    29             (Base Construction Allocation -
    30             $196,000)
    19990S0504B1471                 - 108 -

     1             (Land Allocation - $10,000)
     2             (Design and Contingencies - $37,000)
     3         (24)  SR 2024, Bridge over Towanda Creek,
     4             Towanda Township, Bridge Replacement        1,740,000
     5             (Base Construction Allocation -
     6             $1,400,000)
     7             (Land Allocation - $40,000)
     8             (Design and Contingencies - $300,000)
     9         (25)  SR 4015, Bridge over Mill Creek,
    10             Springfield Township, Bridge
    11             Replacement                                   740,000
    12             (Base Construction Allocation -
    13             $600,000)
    14             (Land Allocation - $20,000)
    15             (Design and Contingencies - $120,000)
    16         (26)  PA 514, Bridge over North Branch of
    17             Towanda Creek, Granville Township,
    18             Bridge Replacement                            630,000
    19             (Base Construction Allocation -
    20             $500,000)
    21             (Land Allocation - $30,000)
    22             (Design and Contingencies - $100,000)
    23         (27)  US 6, Bridge over Sugar Creek,
    24             Sylvania Borough, Bridge Replacement          680,000
    25             (Base Construction Allocation -
    26             $550,000)
    27             (Land Allocation - $30,000)
    28             (Design and Contingencies - $100,000)
    29         (28)  PA 549, Bridge over Daggett Creek,
    30             Wells Township, Bridge Replacement          1,180,000
    19990S0504B1471                 - 109 -

     1             (Base Construction Allocation -
     2             $950,000)
     3             (Land Allocation - $30,000)
     4             (Design and Contingencies - $200,000)
     5         (29)  SR 4002, Bridge over Browns Creek,
     6             Burlington Township, Bridge
     7             Replacement                                   560,000
     8             (Base Construction Allocation -
     9             $450,000)
    10             (Land Allocation - $30,000)
    11             (Design and Contingencies - $80,000)
    12         (30)  SR 1026, Bridge over Wyalusing Creek,
    13             Pike Township, Bridge Replacement             650,000
    14             (Base Construction Allocation -
    15             $520,000)
    16             (Land Allocation - $30,000)
    17             (Design and Contingencies - $100,000)
    18         (31)  PA 187, Bridge over Wappasening
    19             Creek, Windham Township, Bridge
    20             Replacement                                 2,000,000
    21             (Base Construction Allocation -
    22             $1,600,000)
    23             (Land Allocation - $100,000)
    24             (Design and Contingencies - $300,000)
    25         (32)  PA 199, Bridge over Chemung River
    26             Overflow Channel, Athens Township,
    27             Bridge Replacement                          2,000,000
    28             (Base Construction Allocation -
    29             $1,600,000)
    30             (Land Allocation - $100,000)
    19990S0504B1471                 - 110 -

     1             (Design and Contingencies - $300,000)
     2         (33)  US 220, Bridge over Bridge Street,
     3             Towanda Borough, Bridge Rehabilitation        385,000
     4             (Base Construction Allocation -
     5             $350,000)
     6             (Design and Contingencies - $35,000)
     7         (34)  US 220, Bridge over SR 3020, Towanda
     8             Township, Bridge Rehabilitation               495,000
     9             (Base Construction Allocation -
    10             $450,000)
    11             (Design and Contingencies - $45,000)
    12         (35)  US 220, Bridge over SR 2036, North
    13             Towanda Township, Bridge
    14             Rehabilitation                                715,000
    15             (Base Construction Allocation -
    16             $650,000)
    17             (Design and Contingencies - $65,000)
    18         (36)  US 220, Bridge over SR 3022, North
    19             Towanda Township, Bridge
    20             Rehabilitation                                770,000
    21             (Base Construction Allocation -
    22             $700,000)
    23             (Design and Contingencies - $70,000)
    24         (37)  US 220, Bridge over US 6, North
    25             Towanda Township, Bridge
    26             Reconstruction                              1,700,000
    27             (Base Construction Allocation -
    28             $1,500,000)
    29             (Design and Contingencies - $200,000)
    30         (38)  SR 0409, Camp Creek Box Culvert over
    19990S0504B1471                 - 111 -

     1             Camp Creek, Wyalusing Township, Bridge
     2             Replacement                                 1,150,000
     3             (Base Construction Allocation -
     4             $750,000)
     5             (Land Allocation - $200,000)
     6             (Design and Contingencies - $200,000)
     7         (39)  SR 1022, Ulster River Bridge over
     8             Susquehanna River, Ulster Township and
     9             Sheshequin Township, Bridge
    10             Replacement                                16,000,000
    11             (Base Construction Allocation -
    12             $12,800,000)
    13             (Land Allocation - $800,000)
    14             (Design and Contingencies - $2,400,000)
    15         (40)  SR 0014, BRIDGE OVER SUGAR CREEK,                    <--
    16             TROY BOROUGH, BRIDGE REPLACEMENT              450,000
    17             (BASE CONSTRUCTION ALLOCATION -
    18             $300,000)
    19             (LAND ALLOCATION - $30,000)
    20             (DESIGN AND CONTINGENCIES - $120,000)
    21  Section 13.  Bucks County.
    22     (a)  Local Bridges
    23         (1)  Springfield Township, I-479, Bridge
    24             Street Bridge over Cooks Creek, Bridge
    25             Replacement                                   500,000
    26             (Base Construction Allocation -
    27             $365,000)
    28             (Land Allocation - $35,000)
    29             (Design and Contingencies - $100,000)
    30         (2)  Springfield Township, T-404, Hawks
    19990S0504B1471                 - 112 -

     1             Mill County Bridge No.196, Shale Road
     2             over Cooks Creek, Bridge
     3             Rehabilitation                                100,000
     4             (Base Construction Allocation -
     5             $90,000)
     6             (Design and Contingencies - $10,000)
     7         (3)  Bristol Township, Randall Avenue over
     8             Conrail, Bridge Replacement                 5,750,000
     9             (Base Construction Allocation -
    10             $5,000,000)
    11             (Design and Contingencies - $750,000)
    12         (4)  Bedminster Township, T-376, Bridge
    13             over East Branch Perkiomen Creek,
    14             Bridge Replacement                            544,000
    15             (Base Construction Allocation -
    16             $430,000)
    17             (Land Allocation - $4,000)
    18             (Design and Contingencies - $110,000)
    19         (5)  Bristol Borough, Jefferson Avenue
    20             Bridge over Delaware Canal, Bridge
    21             Replacement                                   500,000
    22             (Base Construction Allocation -
    23             $450,000)
    24             (Design and Contingencies - $50,000)
    25         (6)  East Rockhill Township, T-362, Bridge
    26             over East Branch Perkiomen Creek,
    27             Bridge Replacement                            539,000
    28             (Base Construction Allocation -
    29             $425,000)
    30             (Land Allocation - $4,000)
    19990S0504B1471                 - 113 -

     1             (Design and Contingencies - $110,000)
     2         (7)  Falls Township, Wheatshef Road Bridge
     3             over Delaware Canal, Bridge
     4             Replacement                                   700,000
     5         (8)  Plumstead Township, T-340, Bridge over
     6             North Branch Neshaminy, Bridge
     7             Replacement                                   550,000
     8             (Base Construction Allocation -
     9             $425,000)
    10             (Land Allocation - $4,000)
    11             (Design and Contingencies - $121,000)
    12         (9)  Tinicum Township, T-439, Bridge over
    13             Beaver Creek, Bridge Replacement              560,000
    14             (Base Construction Allocation -
    15             $435,000)
    16             (Land Allocation - $5,000)
    17             (Design and Contingencies - $120,000)
    18         (10)  Tinicum/Bedminster, T-427, Bridge
    19             over Tohickon Creek, Bridge
    20             Replacement                                   565,000
    21             (Base Construction Allocation -
    22             $445,000)
    23             (Land Allocation - $5,000)
    24             (Design and Contingencies - $115,000)
    25         (11)  Bensalem/Philadelphia, T-316, Bridge
    26             over Poquessing Creek, Bridge
    27             Replacement                                   840,000
    28             (Base Construction Allocation -
    29             $700,000)
    30             (Land Allocation - $10,000)
    19990S0504B1471                 - 114 -

     1             (Design and Contingencies - $130,000)
     2     (b)  State Bridges
     3         (1)  SR 0032, River Road at Fleecydale over
     4             Paunacussing Creek, Solebury Township,
     5             Bridge Replacement                          1,400,000
     6             (Base Construction Allocation -
     7             $1,200,000)
     8             (Design and Contingencies - $200,000)
     9         (2)  SR 2002, Otter Street Bridge over
    10             Otter Creek, Bristol Borough, Bridge
    11             Replacement                                 1,150,000
    12             (Base Construction Allocation -
    13             $900,000)
    14             (Land Allocation - $50,000)
    15             (Design and Contingencies - $200,000)
    16         (3)  SR 2025, Bristol Road Bridge over
    17             Little Neshaminy Creek, Warwick
    18             Township, Bridge Replacement                1,120,000
    19             (Base Construction Allocation -
    20             $900,000)
    21             (Land Allocation - $80,000)
    22             (Design and Contingencies - $140,000)
    23         (4)  SR 2047, Hulmeville Avenue Bridge over
    24             Conrail, Middletown, Bridge
    25             Replacement                                 5,600,000
    26             (Base Construction Allocation -
    27             $4,000,000)
    28             (Land Allocation - $800,000)
    29             (Design and Contingencies - $800,000)
    30         (5)  SR 4033, Upper Ridge Road Bridge over
    19990S0504B1471                 - 115 -

     1             Unami Creek, Milford Township, Bridge
     2             Replacement                                 2,000,000
     3             (Base Construction Allocation -
     4             $1,600,000)
     5             (Land Allocation - $100,000)
     6             (Design and Contingencies - $300,000)
     7         (6)  SR 4091, Kellers Church Road Bridge
     8             over Deep Run, Bedminster, Bridge
     9             Replacement                                 2,000,000
    10             (Base Construction Allocation -
    11             $1,500,000)
    12             (Land Allocation - $150,000)
    13             (Design and Contingencies - $350,000)
    14         (7)  SR 0202, Doylestown Bypass (Five
    15             Bridges) over SR 0611, Doylestown
    16             Township, Bridge Rehabilitations            2,200,000
    17             (Base Construction Allocation -
    18             $2,000,000)
    19             (Land Allocation - $50,000)
    20             (Design and Contingencies - $150,000)
    21         (8)  SR 0611, Easton Road (Two Bridges)
    22             over Tohickon and Deep Run Creeks,
    23             Bedminister Township, Bridge
    24             Replacements                                1,650,000
    25             (Base Construction Allocation -
    26             $1,500,000)
    27             (Land Allocation - $50,000)
    28             (Design and Contingencies - $100,000)
    29         (9)  SR 2089, Almshouse Road Bridge over
    30             Neshaminy Creek, Doylestown Township,
    19990S0504B1471                 - 116 -

     1             Bridge Replacement                          1,800,000
     2             (Base Construction Allocation -
     3             $1,500,000)
     4             (Land Allocation - $150,000)
     5             (Design and Contingencies - $150,000)
     6         (10)  SR 0013, Bristol Pike over Otter
     7             Creek, Bristol Township, Bridge
     8             Replacement                                 1,600,000
     9             (Base Construction Allocation -
    10             $1,200,000)
    11             (Land Allocation - $100,000)
    12             (Design and Contingencies - $300,000)
    13         (11)  SR 0413, Bridge over Mill Creek,
    14             Bristol Township, Bridge Replacement          600,000
    15             (Base Construction Allocation -
    16             $350,000)
    17             (Land Allocation - $50,000)
    18             (Design and Contingencies - $200,000)
    19         (12)  SR 2002, State Road over Neshaminy
    20             Creek, Bristol Township, Bridge
    21             Replacement                                 3,700,000
    22             (Base Construction Allocation -
    23             $3,000,000)
    24             (Land Allocation - $250,000)
    25             (Design and Contingencies - $450,000)
    26         (13)  SR 0013, Bristol Pike over St.
    27             Francis Creek, Bensalem Township,
    28             Bridge Replacement                            550,000
    29             (Base Construction Allocation -
    30             $400,000)
    19990S0504B1471                 - 117 -

     1             (Land Allocation - $50,000)
     2             (Design and Contingencies - $100,000)
     3         (14)  SR 0013, SR 0013 over Conrail and
     4             Newbold Road, Falls Township, Bridge
     5             Replacement                                 5,000,000
     6             (Base Construction Allocation -
     7             $4,500,000)
     8             (Land Allocation - $150,000)
     9             (Design and Contingencies - $350,000)
    10         (15)  SR 0032, West Bridge Street over
    11             Tributary of Delaware River,
    12             Morrisville Borough, Bridge
    13             Replacement                                   550,000
    14             (Base Construction Allocation -
    15             $400,000)
    16             (Land Allocation - $50,000)
    17             (Design and Contingencies - $100,000)
    18         (16)  SR 0213, West Maple Avenue over
    19             Neshaminy Creek, Middletown Township,
    20             Bridge Replacement                          2,000,000
    21             (Base Construction Allocation -
    22             $1,700,000)
    23             (Land Allocation - $100,000)
    24             (Design and Contingencies - $200,000)
    25         (17)  SR 1004, Cold Spring Creamery Road
    26             over Branch of Pine Run Creek,
    27             Buckingham Township, Bridge
    28             Replacement                                   450,000
    29             (Base Construction Allocation -
    30             $380,000)
    19990S0504B1471                 - 118 -

     1             (Land Allocation - $10,000)
     2             (Design and Contingencies - $60,000)
     3         (18)  SR 2005, Cornwells Avenue over
     4             Poquessing Creek, Bensalem Township,
     5             Bridge Replacement                            350,000
     6             (Base Construction Allocation -
     7             $250,000)
     8             (Land Allocation - $25,000)
     9             (Design and Contingencies - $75,000)
    10         (19)  SR 2026, Trenton Avenue over Rock
    11             Run, Falls Township, Bridge
    12             Replacement                                   700,000
    13             (Base Construction Allocation -
    14             $500,000)
    15             (Land Allocation - $50,000)
    16             (Design and Contingencies - $150,000)
    17         (20)  SR 2037, Lincoln Highway Eastbound
    18             over Queen Anne Creek, Falls Township,
    19             Bridge Replacement                            700,000
    20             (Base Construction Allocation -
    21             $500,000)
    22             (Land Allocation - $75,000)
    23             (Design and Contingencies - $125,000)
    24         (21)  SR 2037, Lincoln Highway over Branch
    25             of Queen Anne Creek, Falls Township,
    26             Bridge Replacement                            500,000
    27             (Base Construction Allocation -
    28             $350,000)
    29             (Land Allocation - $50,000)
    30             (Design and Contingencies - $100,000)
    19990S0504B1471                 - 119 -

     1         (22)  SR 2047, Hulmeville Avenue over
     2             Conrail, Middletown Township, Bridge
     3             Replacement                                 1,200,000
     4             (Base Construction Allocation -
     5             $1,000,000)
     6             (Land Allocation - $75,000)
     7             (Design and Contingencies - $125,000)
     8         (23)  SR 2065, Bustleton Pike/Ironworks
     9             over Ironworks Creek, Northampton
    10             Township, Bridge Rehabilitation               260,000
    11             (Base Construction Allocation -
    12             $200,000)
    13             (Land Allocation - $10,000)
    14             (Design and Contingencies - $50,000)
    15         (24)  Green Lane Bridge over Delaware
    16             Canal, Bristol Borough, Bridge
    17             Replacement                                   200,000
    18         (25)  SR 0013, Bridge over Delaware Canal,
    19             Bristol Township, Bridge Replacement        2,500,000
    20         (26)  Haines Road Bridge over Delaware
    21             Canal, Bristol Township, Bridge
    22             Replacement                                   700,000
    23         (27)  SR 2033, Bridge over Delaware Canal,
    24             Bristol Township, Bridge Replacement          200,000
    25         (28)  Airport Road Bridge over Delaware
    26             Canal, Bristol Township, Bridge
    27             Replacement                                   500,000
    28         (29)  SR 0001, Bridge over Delaware Canal,
    29             Falls Township, Bridge Replacement            300,000
    30         (30)  SR 2020, Bridge over Delaware Canal,
    19990S0504B1471                 - 120 -

     1             Falls Township, Bridge Replacement          3,000,000
     2         (31)  Mill Creek Road Bridge over Delaware
     3             Canal, Falls Township, Bridge
     4             Replacement                                   700,000
     5         (32)  SR 2031, Bridge over Delaware Canal,
     6             Falls Township, Bridge Replacement            800,000
     7         (33)  SR 2033, Bridge over Delaware Canal,
     8             Falls Township, Bridge Replacement            200,000
     9         (34)  SR 0013, Bridge over Delaware Canal,
    10             Falls Township, Bridge Replacement          2,500,000
    11         (35)  SR 0032, Bridge over Tributary of
    12             Delaware River, Morrisville Borough,
    13             Bridge Replacement                            700,000
    14         (36)  SR 2095, DARK HOLLOW ROAD BRIDGE OVER                <--
    15             NESHAMINY CREEK, BUCKINGHAM TOWNSHIP,
    16             CONSTRUCTION OF A PEDESTRIAN/BICYCLE
    17             BRIDGE                                      1,010,000
    18             (BASE CONSTRUCTION ALLOCATION -
    19             $815,000)
    20             (LAND ALLOCATION - $30,000)
    21             (DESIGN AND CONTINGENCIES - $165,000)
    22  Section 14.  Butler County.
    23     (a)  Local Bridges
    24         (1)  Muddy Creek and Worth Townships, T-
    25             348, Muddy Creek Bridge over Muddy
    26             Creek, Bridge Replacement                     730,000
    27             (Base Construction Allocation -
    28             $550,000)
    29             (Land Allocation - $15,000)
    30             (Design and Contingencies - $165,000)
    19990S0504B1471                 - 121 -

     1         (2)  Allegheny Township, T-542, Farrington
     2             Bridge, Bridge Replacement                    700,000
     3             (Base Construction Allocation -
     4             $500,000)
     5             (Land Allocation - $25,000)
     6             (Design and Contingencies - $175,000)
     7         (3)  Concord Township, T-508, Greece City
     8             Bridge, Bridge Replacement                    700,000
     9             (Base Construction Allocation -
    10             $500,000)
    11             (Land Allocation - $25,000)
    12             (Design and Contingencies - $175,000)
    13         (4)  Cranberry Township, T-326 over Brush
    14             Creek, Bridge Replacement                     700,000
    15             (Base Construction Allocation -
    16             $500,000)
    17             (Land Allocation - $25,000)
    18             (Design and Contingencies - $175,000)
    19         (5)  Cranberry Township, T-300, Bridge
    20             Replacement                                   700,000
    21             (Base Construction Allocation -
    22             $500,000)
    23             (Land Allocation - $25,000)
    24             (Design and Contingencies - $175,000)
    25         (6)  Jackson Township, T-323, Senn Bridge,
    26             Bridge Replacement                            700,000
    27             (Base Construction Allocation -
    28             $500,000)
    29             (Land Allocation - $25,000)
    30             (Design and Contingencies - $175,000)
    19990S0504B1471                 - 122 -

     1         (7)  Jackson Township, T-325, Eidewau
     2             Bridge, Bridge Replacement                    700,000
     3             (Base Construction Allocation -
     4             $500,000)
     5             (Land Allocation - $25,000)
     6             (Design and Contingencies - $175,000)
     7         (8)  Jefferson Township, T-844 over Thorn
     8             Creek, Bridge Replacement                     700,000
     9             (Base Construction Allocation -
    10             $500,000)
    11             (Land Allocation - $25,000)
    12             (Design and Contingencies - $175,000)
    13         (9)  Mars Borough, Hook Street, Bridge
    14             Replacement                                   700,000
    15             (Base Construction Allocation -
    16             $500,000)
    17             (Land Allocation - $25,000)
    18             (Design and Contingencies - $175,000)
    19         (10)  Mars Borough, Church Street, Kocher
    20             Bridge, Bridge Replacement                    700,000
    21             (Base Construction Allocation -
    22             $500,000)
    23             (Land Allocation - $25,000)
    24             (Design and Contingencies - $175,000)
    25         (11)  Middlesex Township, T-380 over Glade
    26             Run, Bridge Replacement                       700,000
    27             (Base Construction Allocation -
    28             $500,000)
    29             (Land Allocation - $25,000)
    30             (Design and Contingencies - $175,000)
    19990S0504B1471                 - 123 -

     1         (12)  Worth Township, T-318, Payne Bridge,
     2             Bridge Replacement                            700,000
     3             (Base Construction Allocation -
     4             $500,000)
     5             (Land Allocation - $25,000)
     6             (Design and Contingencies - $175,000)
     7         (13)  Cranberry Township, T-326 over
     8             Tributary of Brush Creek, Bridge
     9             Replacement                                   167,000
    10             (Base Construction Allocation -
    11             $135,000)
    12             (Land Allocation - $19,000)
    13             (Design and Contingencies - $13,000)
    14         (14)  Adams Township, T-391, Brickey and
    15             Hill Bridge over Breakneck Creek,
    16             Bridge Replacement                            600,000
    17         (15)  Butler City, T-319, Brady Street
    18             Bridge, Bridge Replacement                    300,000
    19         (16)  Allegheny Township, T-538, County
    20             Bridge No.4, Squaw Valley Bridge No.1,
    21             Bridge Replacement                            500,000
    22         (17)  Mercer Township, T-434, County Bridge
    23             No.7, Harrisville Bridge, Bridge
    24             Replacement                                   500,000
    25         (18)  Marion Township, T-434 County Bridge
    26             No.9, Wassum Bridge, Bridge
    27             Replacement                                   500,000
    28         (19)  Venango Township, T-649, County
    29             Bridge No.10, Lane Bridge, Bridge
    30             Replacement                                   500,000
    19990S0504B1471                 - 124 -

     1         (20)  Parker Township, T-638, County Bridge
     2             No.12, Snake Bridge, Bridge
     3             Replacement                                   500,000
     4         (21)  Parker Township, T-632, County Bridge
     5             No.13, Old Iron Bridge, Bridge
     6             Replacement                                   500,000
     7         (22)  Slippery Rock Township, T-381, County
     8             Bridge No.25, Grossman Bridge, Bridge
     9             Replacement                                   600,000
    10         (23)  Cherry Township, T-428, County Bridge
    11             No.26, Duffy Bridge, Bridge
    12             Replacement                                   600,000
    13         (24)  Cherry Township, T-535, County Bridge
    14             No.28, Findley Bridge, Bridge
    15             Replacement                                   500,000
    16         (25)  Cherry Township, T-416, County Bridge
    17             No.29, Christy Bridge No.2, Bridge
    18             Replacement                                   500,000
    19         (26)  Cherry Township, T-560, County Bridge
    20             No.32, Bridge Replacement                     700,000
    21         (27)  Washington Township, T-504, County
    22             Bridge No.35, Campbell Bridge, Bridge
    23             Replacement                                   500,000
    24         (28)  Washington Township, T-452, County
    25             Bridge No.36, Hilliard Bridge, Bridge
    26             Replacement                                   500,000
    27         (29)  Fairview Township, T-636, County
    28             Bridge No.39, Murtland Bridge, Bridge
    29             Replacement                                   600,000
    30         (30)  Fairview Township, T-676, County
    19990S0504B1471                 - 125 -

     1             Bridge No.42, Burk Bridge, Bridge
     2             Replacement                                   600,000
     3         (31)  Clay Township, T-416, County Bridge
     4             No.48, R. C. Miller Bridge, Bridge
     5             Replacement                                   500,000
     6         (32)  Clay Township, T-414, County Bridge
     7             No.49, Muddycreek Bridge, Bridge
     8             Replacement                                   600,000
     9         (33)  Brady Township, T-368, County Bridge
    10             No.52, McCracken Bridge, Bridge
    11             Replacement                                   600,000
    12         (34)  Brady Township, T-456, County Bridge
    13             No.53, Wigton Bridge, Bridge
    14             Replacement                                   500,000
    15         (35)  Brady Township, T-414, County Bridge
    16             No.54, Frank Hall Bridge, Bridge
    17             Replacement                                   500,000
    18         (36)  Muddycreek Township, T-348, County
    19             Bridge No.59, Book Bridge, Bridge
    20             Replacement                                   500,000
    21         (37)  Worth Township, T-318, County Bridge
    22             No.60, Payne Bridge No.2, Bridge
    23             Replacement                                   500,000
    24         (38)  Muddycreek Township, T-357, County
    25             Bridge No.62, Flinner Bridge, Bridge
    26             Replacement                                   500,000
    27         (39)  Summit Township, T-584, County Bridge
    28             No.70, Wadsworth Bridge, Bridge
    29             Replacement                                   600,000
    30         (40)  Clearfield Township, T-630, County
    19990S0504B1471                 - 126 -

     1             Bridge No.77, McBride Bridge No.2,
     2             Bridge Replacement                            600,000
     3         (41)  Clearfield Township, T-630, County
     4             Bridge No.78, McBride Bridge No.1,
     5             Bridge Replacement                            600,000
     6         (42)  Clearfield Bridge, T-578, County
     7             Bridge No.79, Schuler Bridge, Bridge
     8             Replacement                                   600,000
     9         (43)  Clearfield Township, T-691, County
    10             Bridge, No.80, Humes Bridge, Bridge
    11             Replacement                                   500,000
    12         (44)  Connoquenessing Township, T-431,
    13             County Bridge No.82, McGinnis Bridge,
    14             Bridge Replacement                            700,000
    15         (45)  Connoquennessing Township, T-427,
    16             County Bridge No.84, Hays Bridge,
    17             Bridge Replacement                            600,000
    18         (46)  Conoquennessing Township, T-340,
    19             County Bridge No.86, Kniess Bridge,
    20             Bridge Replacement                            600,000
    21         (47)  Franklin Township, T-439, County
    22             Bridge No.87, Martin Bridge, Bridge
    23             Replacement                                   600,000
    24         (48)  Lancaster Township, T-338, County
    25             Bridge No.90, Drushel Bridge, Bridge
    26             Replacement                                   600,000
    27         (49)  Lancaster Township, T-339, County
    28             Bridge No.93, Eichenauer Bridge, Bridge
    29             Replacement                                   500,000
    30         (50)  Jackson Township, T-323, County
    19990S0504B1471                 - 127 -

     1             Bridge No.97, Senn Bridge, Bridge
     2             Replacement                                   600,000
     3         (51)  Zelienople Borough, Market Street,
     4             County Bridge No.99, Iron City Bridge,
     5             Bridge Replacement                            600,000
     6         (52)  Forward Township, T-407, County
     7             Bridge No.105, Martin Bridge, Bridge
     8             Replacement                                   600,000
     9         (53)  Forward Township, T-423, County
    10             Bridge No.106, Mardica Bridge, Bridge
    11             Replacement                                   600,000
    12         (54)  Clinton Township, T-570, County
    13             Bridge No.118, Hemphill Bridge, Bridge
    14             Replacement                                   600,000
    15         (55)  Clinton Township, T-572, County
    16             Bridge No.120, Cunningham Bridge,
    17             Bridge Replacement                            600,000
    18         (56)  Clinton Township, T-554, County
    19             Bridge No.122, Brickyard Hill Bridge,
    20             Bridge Replacement                            500,000
    21         (57)  Clinton Township, T-552, County
    22             Bridge No.123, Wiley Bridge, Bridge
    23             Replacement                                   500,000
    24         (58)  Mars Borough, T-396, County Bridge
    25             No.133, Mars Bridge, Bridge
    26             Replacement                                   600,000
    27         (59)  Adams Township, T-401, County Bridge
    28             No.137, Rosebaugh Bridge, Bridge
    29             Replacement                                   700,000
    30         (60)  Adams Township, T-403, County Bridge
    19990S0504B1471                 - 128 -

     1             No.138, Hays Bridge, Bridge
     2             Replacement                                   600,000
     3         (61)  Middlesex Township, T-485, County
     4             Bridge No.141, Steiner Bridge, Bridge
     5             Replacement                                   500,000
     6         (62)  Middlesex Township, T-380, County
     7             Bridge No.142, Glade Run Bridge, Bridge
     8             Replacement                                   600,000
     9         (63)  Middlesex Township, T-384, County
    10             Bridge No.144, Rifley Bridge, Bridge
    11             Replacement                                   600,000
    12         (64)  Callery Borough, Main Street, County
    13             Bridge No.149, Ringeisen Bridge, Bridge
    14             Replacement                                   600,000
    15         (65)  Adams Township, Rosebaugh Bridge over
    16             South Branch Glade Run, Bridge
    17             Replacement                                   705,000
    18             (Base Construction Allocation -
    19             $500,000)
    20             (Land Allocation - $75,000)
    21             (Design and Contingencies - $130,000)
    22         (66)  Adams Township, Brickyard Hill Bridge
    23             over Breakneck Creek, Bridge
    24             Replacement                                   410,000
    25             (Base Construction Allocation -
    26             $300,000)
    27             (Land Allocation - $30,000)
    28             (Design and Contingencies - $80,000)
    29         (67)  Adams Township, T-396, Bridge over
    30             Breakneck Creek, Bridge Replacement           500,000
    19990S0504B1471                 - 129 -

     1         (68)  Allegheny Township, T-538, Bridge
     2             over Lowery Run, Bridge Replacement           500,000
     3         (69)  Buffalo Township, T-578, Bridge over
     4             Sarver Run, Bridge Replacement                500,000
     5         (70)  Buffalo Township, T-671, Bridge over
     6             Tributary of Buffalo Creek, Bridge
     7             Replacement                                   500,000
     8         (71)  Bull Creek, T-572, Bridge over Bull
     9             Creek, Bridge Replacement                     500,000
    10         (72)  Center Township, T-500, Bridge over
    11             Connoquenessing Creek, Bridge
    12             Replacement                                   500,000
    13         (73)  Cherry Township, T-537, Bridge over
    14             South Branch Slippery Run, Bridge
    15             Replacement                                   500,000
    16         (74)  Cherry Township, T-428, Bridge over
    17             McMurray Run, Bridge Replacement              500,000
    18         (75)  Cherry Valley Borough, T-528, Bridge
    19             over Scrub Grass Creek, Bridge
    20             Replacement                                   500,000
    21         (76)  City of Butler, Mercer Street Bridge
    22             over Sullivan Run, Bridge Replacement         300,000
    23         (77)  City of Butler, Miller Street Bridge
    24             over Sullivan Run, Bridge Replacement         300,000
    25         (78)  City of Butler, South Monroe Street
    26             Bridge over Connoquenessing Creek,
    27             Bridge Rehabilitation                          80,000
    28         (79)  City of Butler, North 6th Avenue
    29             Bridge over Sullivan Run, Bridge
    30             Rehabilitation                                 40,000
    19990S0504B1471                 - 130 -

     1         (80)  Clay Township, T-458, Bridge over
     2             Muddy Creek, Bridge Replacement               500,000
     3         (81)  Clay Township, T-531, Bridge over
     4             Claytonia Run, Bridge Replacement             500,000
     5         (82)  Clearfield Township, T-595, Bridge
     6             over Buffalo Creek, Bridge Replacement        500,000
     7         (83)  Clearfield Township, T-627, Bridge
     8             over Little Buffalo Run, Bridge
     9             Replacement                                   500,000
    10         (84)  Clearfield Township, T-578, Bridge
    11             over Little Buffalo Run, Bridge
    12             Replacement                                   500,000
    13         (85)  Clinton Township, T-570, Bridge over
    14             Goldscheitter Creek, Bridge
    15             Replacement                                   500,000
    16         (86)  Concord Township, T-621, Bridge over
    17             Robinson Run, Bridge Replacement              500,000
    18         (87)  Concord Township, T-502, Bridge over
    19             Tributary of Connoquenessing Creek,
    20             Bridge Replacement                            500,000
    21         (88)  Fairview Township, T-625, Bridge over
    22             Bear Creek, Bridge Replacement                500,000
    23         (89)  Fairview Township, T-676, Bridge over
    24             Hays Run, Bridge Replacement                  500,000
    25         (90)  Fairview Township, T-636, Bridge over
    26             Bear Creek, Bridge Replacement                500,000
    27         (91)  Forward Township, T-407, Bridge over
    28             Glade Run, Bridge Replacement                 500,000
    29         (92)  Frank Hall, T-414, Bridge over
    30             Hallston Run, Bridge Replacement              500,000
    19990S0504B1471                 - 131 -

     1         (93)  Glade Run, T-423, Bridge over Glade
     2             Run, Bridge Replacement                       500,000
     3         (94)  Lancaster Township, T-338, Bridge
     4             over Little Yellow Creek, Bridge
     5             Replacement                                   500,000
     6         (95)  Marion Township, T-476, Bridge over
     7             Tributary of Slippery Rock Creek,
     8             Bridge Replacement                            500,000
     9         (96)  Mars Borough, Crowe Street Bridge
    10             over Breakneck Creek, Bridge
    11             Replacement                                   500,000
    12         (97)  Mercer Township, T-467, Bridge over
    13             McMurry Run, Bridge Replacement               500,000
    14         (98)  Muddy Creek, T-416, Bridge over Muddy
    15             Creek, Bridge Replacement                     500,000
    16         (99)  Oakland Township, T-620, Bridge over
    17             Bonnie Brook, Bridge Replacement              500,000
    18         (100)  Oakland Township, T-603, Bridge over
    19             Bonnie Brook, Bridge Replacement              500,000
    20         (101)  Parker Township, T-638, Bridge over
    21             Silver Creek, Bridge Replacement              500,000
    22         (102)  Parker Township, T-723, Bridge over
    23             Bear Creek, Bridge Replacement                500,000
    24         (103)  Penn Township, T-495, Bridge over
    25             Robinson Run, Bridge Replacement              500,000
    26         (104)  Slippery Rock Township, T-381,
    27             Bridge over Keifer Run, Bridge
    28             Replacement                                   500,000
    29         (105)  Venango Township, T-649, Bridge over
    30             Murrin Run, Bridge Replacement                500,000
    19990S0504B1471                 - 132 -

     1         (106)  Washington Township, T-504, Bridge
     2             over Christy Run, Bridge Replacement          500,000
     3         (107)  Washington Township, T-506, Bridge
     4             over North Branch Slippery Run, Bridge
     5             Replacement                                   500,000
     6         (108)  Washington Township, T-504, Bridge
     7             over Christy Run, Bridge Replacement          500,000
     8         (109)  Winfield Township, T-626, Bridge
     9             over Rough Run, Bridge Replacement            500,000
    10         (110)  Worth Township, T-373, Bridge over
    11             Tributary of Muddy Creek, Bridge
    12             Replacement                                   500,000
    13         (111)  Worth Township, T-377, Bridge over
    14             Black Run, Bridge Replacement                 500,000
    15         (112)  MARION TOWNSHIP, T-477, NORTH BRANCH                <--
    16             BRIDGE OVER NORTH BRANCH OF SLIPPERY
    17             ROCK, BRIDGE REPLACEMENT                      160,000
    18             (BASE CONSTRUCTION ALLOCATION -
    19             $100,000)
    20             (LAND ALLOCATION - $10,000)
    21             (DESIGN AND CONTINGENCIES - $50,000)
    22     (b)  State Bridges
    23         (1)  SR 0228, Houseville Bridge over B&LE
    24             Railroad, Clinton Township, Bridge Deck
    25             Replacement                                   636,000
    26             (Base Construction Allocation -
    27             $600,000)
    28             (Design and Contingencies - $36,000)
    29         (2)  SR 0019, Rose Point Bridge over SR
    30             0422, Muddycreek Township, Bridge
    19990S0504B1471                 - 133 -

     1             Painting                                      115,000
     2             (Base Construction Allocation -
     3             $100,000)
     4             (Design and Contingencies - $15,000)
     5         (3)  SR 0058, Blocks Run Bridge No.1 over
     6             Blocks Run, Marion Township, Bridge
     7             Painting                                       65,000
     8             (Base Construction Allocation -
     9             $50,000)
    10             (Design and Contingencies - $15,000)
    11         (4)  SR 0058, Blocks Run Bridge No.2 over
    12             Blocks Run, Venango Township, Bridge
    13             Painting                                       60,000
    14             (Base Construction Allocation -
    15             $45,000)
    16             (Design and Contingencies - $15,000)
    17         (5)  SR 0058, Murrin Run Bridge over Murrin
    18             Run, Venango Township, Bridge Painting         60,000
    19             (Base Construction Allocation -
    20             $45,000)
    21             (Design and Contingencies - $15,000)
    22         (6)  SR 0068, Glade Run Bridge over Glade
    23             Run, Zelienople Borough, Bridge
    24             Painting                                       70,000
    25             (Base Construction Allocation -
    26             $55,000)
    27             (Design and Contingencies - $15,000)
    28         (7)  SR 0079, Muddy Creek Bridge Northbound
    29             over SR 0422 and Muddy Creek, Muddy
    30             Creek Township, Bridge Painting               255,000
    19990S0504B1471                 - 134 -

     1             (Base Construction Allocation -
     2             $240,000)
     3             (Design and Contingencies - $15,000)
     4         (8)  SR 0079, Muddy Creek Bridge Southbound
     5             over SR 0422 and Muddy Creek, Muddy
     6             Creek Township, Bridge Painting               255,000
     7             (Base Construction Allocation -
     8             $240,000)
     9             (Design and Contingencies - $15,000)
    10         (9)  SR 0108, Slippery Rock Exit Bridge
    11             over I-79, Worth Township, Bridge
    12             Painting                                      225,000
    13             (Base Construction Allocation -
    14             $210,000)
    15             (Design and Contingencies - $15,000)
    16         (10)  SR 0138, Glades Wildlife Lake Bridge
    17             over South Branch of Slippery Rock
    18             Creek, Concord Township, Bridge
    19             Painting                                       85,000
    20             (Base Construction Allocation -
    21             $70,000)
    22             (Design and Contingencies - $15,000)
    23         (11)  SR 0258, Wolf Creek Bridge over Wolf
    24             Creek, Slippery Rock Township, Bridge
    25             Painting                                      125,000
    26             (Base Construction Allocation -
    27             $110,000)
    28             (Design and Contingencies - $15,000)
    29         (12)  SR 0308, Renick Bridge over Stoney
    30             Run and Railroad, Center Township,
    19990S0504B1471                 - 135 -

     1             Bridge Painting                               405,000
     2             (Base Construction Allocation -
     3             $390,000)
     4             (Design and Contingencies - $15,000)
     5         (13)  SR 0422, Mount Chestnut Bridge
     6             Eastbound over Little Connoquenessing
     7             Creek and SR 3007, Butler Township,
     8             Bridge Painting                               355,000
     9             (Base Construction Allocation -
    10             $340,000)
    11             (Design and Contingencies - $15,000)
    12         (14)  SR 0422, Bonnie Brook Bridge over
    13             Bonnie Brook, Summit Township, Bridge
    14             Painting                                       90,000
    15             (Base Construction Allocation -
    16             $75,000)
    17             (Design and Contingencies - $15,000)
    18         (15)  SR 1004, Bruin Bridge over Bear
    19             Creek, Bruin Borough, Bridge Painting          85,000
    20             (Base Construction Allocation -
    21             $70,000)
    22             (Design and Contingencies - $15,000)
    23         (16)  SR 1011, Rattigan Bridge No.1 over
    24             Buffalo Creek, Donegal Township, Bridge
    25             Painting                                       55,000
    26             (Base Construction Allocation -
    27             $40,000)
    28             (Design and Contingencies - $15,000)
    29         (17)  SR 1016, Eastland Drive Bridge over
    30             Connoquenessing Creek, Butler Township,
    19990S0504B1471                 - 136 -

     1             Bridge Painting                                80,000
     2             (Base Construction Allocation -
     3             $65,000)
     4             (Design and Contingencies - $15,000)
     5         (18)  SR 1019, Rough Run Bridge over Rough
     6             Run, Windfield Township, Bridge
     7             Painting                                       95,000
     8             (Base Construction Allocation -
     9             $80,000)
    10             (Design and Contingencies - $15,000)
    11         (19)  SR 1019, Chicora Bridge over Buffalo
    12             Creek, Chicora Borough, Bridge
    13             Painting                                       70,000
    14             (Base Construction Allocation -
    15             $55,000)
    16             (Design and Contingencies - $15,000)
    17         (20)  SR 1021, Rattigan Bridge No.2 over
    18             Buffalo Creek, Donegal Township, Bridge
    19             Painting                                       70,000
    20             (Base Construction Allocation -
    21             $55,000)
    22             (Design and Contingencies - $15,000)
    23         (21)  SR 1025, Bonnie Brook Bridge No.1
    24             over Bonnie Brook, Summit Township,
    25             Bridge Painting                                90,000
    26             (Base Construction Allocation -
    27             $75,000)
    28             (Design and Contingencies - $15,000)
    29         (22)  SR 2004, Connoquenessing Creek Bridge
    30             over Connoquenessing Creek, Butler
    19990S0504B1471                 - 137 -

     1             City, Bridge Painting                         135,000
     2             (Base Construction Allocation -
     3             $120,000)
     4             (Design and Contingencies - $15,000)
     5         (23)  SR 2004, Bonnie Brook Bridge No.2
     6             over Bonnie Brook, East Butler Borough,
     7             Bridge Painting                                90,000
     8             (Base Construction Allocation -
     9             $75,000)
    10             (Design and Contingencies - $15,000)
    11         (24)  SR 2011, Lardintown Run Bridge No.1
    12             over Lardintown Run, Clinton Township,
    13             Bridge Painting                                75,000
    14             (Base Construction Allocation -
    15             $60,000)
    16             (Design and Contingencies - $15,000)
    17         (25)  SR 2011, Lardintown Run Bridge No.2
    18             over Lardintown Run, Clinton Township,
    19             Bridge Painting                                65,000
    20             (Base Construction Allocation -
    21             $50,000)
    22             (Design and Contingencies - $15,000)
    23         (26)  SR 2011, Lardintown Run Bridge No.3
    24             over Lardintown Run, Clinton Township,
    25             Bridge Painting                                65,000
    26             (Base Construction Allocation -
    27             $50,000)
    28             (Design and Contingencies - $15,000)
    29         (27)  SR 3004, McCalmont Bridge over
    30             Connoquenessing Creek, Butler Township,
    19990S0504B1471                 - 138 -

     1             Bridge Painting                               105,000
     2             (Base Construction Allocation -
     3             $90,000)
     4             (Design and Contingencies - $15,000)
     5         (28)  SR 3007, Reinfrew Bridge over
     6             Connoquenessing Creek, Penn Township,
     7             Bridge Painting                               115,000
     8             (Base Construction Allocation -
     9             $100,000)
    10             (Design and Contingencies - $15,000)
    11         (29)  SR 3010, Zeno Bridge over Glade Run,
    12             Forward Township, Bridge Painting             105,000
    13             (Base Construction Allocation -
    14             $90,000)
    15             (Design and Contingencies - $15,000)
    16         (30)  SR 3017, Kaufman Run Bridge over
    17             Kaufman Run, Adams Township, Bridge
    18             Painting                                       70,000
    19             (Base Construction Allocation -
    20             $55,000)
    21             (Design and Contingencies - $15,000)
    22         (31)  SR 3017, Breakneck Creek Bridge over
    23             Breakneck Creek, Adams Township, Bridge
    24             Painting                                      105,000
    25             (Base Construction Allocation -
    26             $90,000)
    27             (Design and Contingencies - $15,000)
    28         (32)  SR 3025, Little Connoquenessing Creek
    29             Bridge over Little Connoquenessing
    30             Creek, Lancaster Township, Bridge
    19990S0504B1471                 - 139 -

     1             Painting                                      125,000
     2             (Base Construction Allocation -
     3             $110,000)
     4             (Design and Contingencies - $15,000)
     5         (33)  SR 4006, Keister's Bridge over
     6             Slippery Rock Creek, Slippery Rock
     7             Township, Bridge Painting                     105,000
     8             (Base Construction Allocation -
     9             $90,000)
    10             (Design and Contingencies - $15,000)
    11         (34)  SR 4007, Lake Arthur Tributary Bridge
    12             over a tributary of Lake Arthur, Worth
    13             Township, Bridge Painting                      50,000
    14             (Base Construction Allocation -
    15             $35,000)
    16             (Design and Contingencies - $15,000)
    17         (35)  SR 4007, I-79 North Bridge No.1 over
    18             I-79, Worth Township, Bridge Painting         245,000
    19             (Base Construction Allocation -
    20             $230,000)
    21             (Design and Contingencies - $15,000)
    22         (36)  SR 4007, I-79 North Bridge No.2 over
    23             I-79, Worth Township, Bridge Painting         215,000
    24             (Base Construction Allocation -
    25             $200,000)
    26             (Design and Contingencies - $15,000)
    27         (37)  SR 4010, Bull Valley Bridge over Bull
    28             Valley Creek, Washington Township,
    29             Bridge Painting                                65,000
    30             (Base Construction Allocation -
    19990S0504B1471                 - 140 -

     1             $50,000)
     2             (Design and Contingencies - $15,000)
     3         (38)  SR 4012, Seaton Creek Bridge over
     4             Seaton Creek, Marion Township, Bridge
     5             Painting                                       65,000
     6             (Base Construction Allocation -
     7             $50,000)
     8             (Design and Contingencies - $15,000)
     9         (39)  SR 8002, North Shore Exit Bridge over
    10             Muddy Creek, Worth Township, Bridge
    11             Painting                                       85,000
    12             (Base Construction Allocation -
    13             $70,000)
    14             (Design and Contingencies - $15,000)
    15         (40)  SR 0422, Route 422 Overpass,
    16             Muddycreek Township, Bridge
    17             Replacement                                 1,450,000
    18             (Base Construction Allocation -
    19             $1,000,000)
    20             (Land Allocation - $100,000)
    21             (Design and Contingencies - $350,000)
    22         (41)  SR 0008, B&LE Railroad Overpass,
    23             Mercer Township, Bridge Replacement         1,450,000
    24             (Base Construction Allocation -
    25             $1,000,000)
    26             (Land Allocation - $100,000)
    27             (Design and Contingencies - $350,000)
    28         (42)  SR 0038, B&LE Railroad Overpass,
    29             Concord Township, Bridge Replacement        1,050,000
    30             (Base Construction Allocation -
    19990S0504B1471                 - 141 -

     1             $750,000)
     2             (Land Allocation - $50,000)
     3             (Design and Contingencies - $250,000)
     4         (43)  SR 2002, Conrail Railroad Overpass,
     5             Summit Township, Bridge Replacement         1,050,000
     6             (Base Construction Allocation -
     7             $750,000)
     8             (Land Allocation - $50,000)
     9             (Design and Contingencies - $250,000)
    10         (44)  SR 2012, B&LE Railroad Overpass,
    11             Jefferson Township, Bridge Replacement      1,050,000
    12             (Base Construction Allocation -
    13             $750,000)
    14             (Land Allocation - $50,000)
    15             (Design and Contingencies - $250,000)
    16         (45)  SR 3004, B&LE Railroad Overpass,
    17             Butler Township, Bridge Replacement           595,000
    18             (Base Construction Allocation -
    19             $400,000)
    20             (Land Allocation - $20,000)
    21             (Design and Contingencies - $175,000)
    22         (46)  SR 0008, Bridge over Armco Private
    23             Drive, Butler Township, Bridge
    24             Replacement                                 1,450,000
    25             (Base Construction Allocation -
    26             $1,000,000)
    27             (Land Allocation - $100,000)
    28             (Design and Contingencies - $350,000)
    29         (47)  SR 0019, Scholars Run Bridge, Jackson
    30             Township, Bridge Replacement                1,050,000
    19990S0504B1471                 - 142 -

     1             (Base Construction Allocation -
     2             $750,000)
     3             (Land Allocation - $50,000)
     4             (Design and Contingencies - $250,000)
     5         (48)  SR 0019, SR 0019 over SR 0422,
     6             Muddycreek Township, Bridge
     7             Replacement                                 1,050,000
     8             (Base Construction Allocation -
     9             $750,000)
    10             (Land Allocation - $50,000)
    11             (Design and Contingencies - $250,000)
    12         (49)  SR 0058, McMurray Run Bridge, Marion
    13             Township, Bridge Replacement                1,050,000
    14             (Base Construction Allocation -
    15             $750,000)
    16             (Land Allocation - $50,000)
    17             (Design and Contingencies - $250,000)
    18         (50)  SR 0068, Sullivan Run Bridge, Butler
    19             Township, Bridge Replacement                1,450,000
    20             (Base Construction Allocation -
    21             $1,000,000)
    22             (Land Allocation - $100,000)
    23             (Design and Contingencies - $350,000)
    24         (51)  SR 0080, I-80 over TR 540, Allegheny
    25             Township, Bridge Replacement                1,450,000
    26             (Base Construction Allocation -
    27             $1,000,000)
    28             (Land Allocation - $100,000)
    29             (Design and Contingencies - $350,000)
    30         (52)  SR 0138, Muddy Creek Bridge, Clay
    19990S0504B1471                 - 143 -

     1             Township, Bridge Replacement                  595,000
     2             (Base Construction Allocation -
     3             $400,000)
     4             (Land Allocation - $20,000)
     5             (Design and Contingencies - $175,000)
     6         (53)  SR 0173, Slippery Rock Creek Bridge,
     7             Slippery Rock Township, Bridge
     8             Replacement                                 1,050,000
     9             (Base Construction Allocation -
    10             $750,000)
    11             (Land Allocation - $50,000)
    12             (Design and Contingencies - $250,000)
    13         (54)  SR 0079, I-79 North Bridge over Ramp,
    14             Jackson Township, Bridge Replacement        1,450,000
    15             (Base Construction Allocation -
    16             $1,000,000)
    17             (Land Allocation - $100,000)
    18             (Design and Contingencies - $350,000)
    19         (55)  SR 0079, I-79 South Bridge over Ramp,
    20             Jackson Township, Bridge Replacement        1,450,000
    21             (Base Construction Allocation -
    22             $1,000,000)
    23             (Land Allocation - $100,000)
    24             (Design and Contingencies - $350,000)
    25         (56)  SR 0079, I-79 over SR 0068, Jackson
    26             Township, Bridge Replacement                1,450,000
    27             (Base Construction Allocation -
    28             $1,000,000)
    29             (Land Allocation - $100,000)
    30             (Design and Contingencies - $350,000)
    19990S0504B1471                 - 144 -

     1         (57)  SR 0079, I-79 over TR 347, Lancaster
     2             Township, Bridge Replacement                1,450,000
     3             (Base Construction Allocation -
     4             $1,000,000)
     5             (Land Allocation - $100,000)
     6             (Design and Contingencies - $350,000)
     7         (58)  SR 0079, I-79 North Bridge over SR
     8             0422, Worth Township, Bridge
     9             Replacement                                 1,450,000
    10             (Base Construction Allocation -
    11             $1,000,000)
    12             (Land Allocation - $100,000)
    13             (Design and Contingencies - $350,000)
    14         (59)  SR 0079, I-79 South Bridge over SR
    15             0422, Worth Township, Bridge
    16             Replacement                                 1,450,000
    17             (Base Construction Allocation -
    18             $1,000,000)
    19             (Land Allocation - $100,000)
    20             (Design and Contingencies - $350,000)
    21         (60)  SR 0422, SR 0422 over SR 4005,
    22             Muddycreek Township, Bridge
    23             Replacement                                 1,450,000
    24             (Base Construction Allocation -
    25             $1,000,000)
    26             (Land Allocation - $100,000)
    27             (Design and Contingencies - $350,000)
    28         (61)  SR 0528, SR 0528 over SR 0422,
    29             Franklin Township, Bridge Replacement       1,050,000
    30             (Base Construction Allocation -
    19990S0504B1471                 - 145 -

     1             $750,000)
     2             (Land Allocation - $50,000)
     3             (Design and Contingencies - $250,000)
     4         (62)  SR 1010, Bear Creek Bridge, Fairview
     5             Township, Bridge Replacement                1,050,000
     6             (Base Construction Allocation -
     7             $750,000)
     8             (Land Allocation - $50,000)
     9             (Design and Contingencies - $250,000)
    10         (63)  SR 1014, Bonnie Brook Bridge over
    11             Bonnie Brook, Summit Township, Bridge
    12             Replacement                                   595,000
    13             (Base Construction Allocation -
    14             $400,000)
    15             (Land Allocation - $20,000)
    16             (Design and Contingencies - $175,000)
    17         (64)  SR 1016, Connoquenessing Creek
    18             Bridge, Summit Township, Bridge
    19             Replacement                                   595,000
    20             (Base Construction Allocation -
    21             $400,000)
    22             (Land Allocation - $20,000)
    23             (Design and Contingencies - $175,000)
    24         (65)  SR 2006, SR 2006 over SR 0422, Summit
    25             Township, Bridge Replacement                1,050,000
    26             (Base Construction Allocation -
    27             $750,000)
    28             (Land Allocation - $50,000)
    29             (Design and Contingencies - $250,000)
    30         (66)  SR 2010, Bridge over Branch of Thorn
    19990S0504B1471                 - 146 -

     1             Creek, Jefferson Township, Bridge
     2             Replacement                                 1,050,000
     3             (Base Construction Allocation -
     4             $750,000)
     5             (Land Allocation - $50,000)
     6             (Design and Contingencies - $250,000)
     7         (67)  SR 2010, Little Buffalo Creek Bridge,
     8             Winfield Township, Bridge Replacement       1,050,000
     9             (Base Construction Allocation -
    10             $750,000)
    11             (Land Allocation - $50,000)
    12             (Design and Contingencies - $250,000)
    13         (68)  SR 2011, Bridge over Branch of Bull
    14             Creek, Clinton Township, Bridge
    15             Replacement                                   595,000
    16             (Base Construction Allocation -
    17             $400,000)
    18             (Land Allocation - $20,000)
    19             (Design and Contingencies - $175,000)
    20         (69)  SR 2011, Little Bull Run Bridge No.4
    21             over Bull Run, Clinton Township, Bridge
    22             Replacement                                   595,000
    23             (Base Construction Allocation -
    24             $400,000)
    25             (Land Allocation - $20,000)
    26             (Design and Contingencies - $175,000)
    27         (70)  SR 2018, Bridge No.1 over Branch of
    28             Buffalo Creek, Winfield Township,
    29             Bridge Replacement                          1,050,000
    30             (Base Construction Allocation -
    19990S0504B1471                 - 147 -

     1             $750,000)
     2             (Land Allocation - $50,000)
     3             (Design and Contingencies - $250,000)
     4         (71)  SR 2018, Bridge No.2 over Branch of
     5             Buffalo Creek, Winfield Township,
     6             Bridge Replacement                          1,050,000
     7             (Base Construction Allocation -
     8             $750,000)
     9             (Land Allocation - $50,000)
    10             (Design and Contingencies - $250,000)
    11         (72)  SR 3025, Little Connoquenessing Creek
    12             Bridge, Lancaster Township, Bridge
    13             Replacement                                   595,000
    14             (Base Construction Allocation -
    15             $400,000)
    16             (Land Allocation - $20,000)
    17             (Design and Contingencies - $175,000)
    18         (73)  SR 4007, SR 4007 over SR 0422, Worth
    19             Township, Bridge Replacement                1,050,000
    20             (Base Construction Allocation -
    21             $750,000)
    22             (Land Allocation - $50,000)
    23             (Design and Contingencies - $250,000)
    24         (74)  SR 4007, Park Road Bridge, Worth
    25             Township, Bridge Replacement                1,050,000
    26             (Base Construction Allocation -
    27             $750,000)
    28             (Land Allocation - $50,000)
    29             (Design and Contingencies - $250,000)
    30         (75)  SR 4010, Long Run Bridge, Slippery
    19990S0504B1471                 - 148 -

     1             Rock Township, Bridge Replacement             595,000
     2             (Base Construction Allocation -
     3             $400,000)
     4             (Land Allocation - $20,000)
     5             (Design and Contingencies - $175,000)
     6         (76)  SR 8005, SR 8005 over SR 0019,
     7             Jackson Township, Bridge Replacement          595,000
     8             (Base Construction Allocation -
     9             $400,000)
    10             (Land Allocation - $20,000)
    11             (Design and Contingencies - $175,000)
    12         (77)  SR 0008, William Flynn Bridge,
    13             Middlesex Township, Bridge Replacement      1,450,000
    14             (Base Construction Allocation -
    15             $1,000,000)
    16             (Land Allocation - $100,000)
    17             (Design and Contingencies - $350,000)
    18         (78)  SR 0008, Glade Run Bridge, Middlesex
    19             Township, Bridge Rehabilitation             1,450,000
    20             (Base Construction Allocation -
    21             $1,000,000)
    22             (Land Allocation - $100,000)
    23             (Design and Contingencies - $350,000)
    24         (79)  SR 0008, Little Glade Run Bridge
    25             No.1, Middlesex Township, Bridge
    26             Rehabilitation                              1,450,000
    27             (Base Construction Allocation -
    28             $1,000,000)
    29             (Land Allocation - $100,000)
    30             (Design and Contingencies - $350,000)
    19990S0504B1471                 - 149 -

     1         (80)  SR 0008, Little Glade Run Bridge
     2             No.2, Middlesex Township, Bridge
     3             Rehabilitation                              1,450,000
     4             (Base Construction Allocation -
     5             $1,000,000)
     6             (Land Allocation - $100,000)
     7             (Design and Contingencies - $350,000)
     8         (81)  SR 0008, Glade Run Bridge No.2,
     9             Middlesex Township, Bridge
    10             Rehabilitation                              1,450,000
    11             (Base Construction Allocation -
    12             $1,000,000)
    13             (Land Allocation - $100,000)
    14             (Design and Contingencies - $350,000)
    15         (82)  SR 0008, Bulcher Run Bridge, Butler
    16             Township, Bridge Rehabilitation             1,450,000
    17             (Base Construction Allocation -
    18             $1,000,000)
    19             (Land Allocation - $100,000)
    20             (Design and Contingencies - $350,000)
    21         (83)  SR 0008, Bridge No.2 over Branch of
    22             Muddy Creek, Clay Township, Bridge
    23             Rehabilitation                              1,450,000
    24             (Base Construction Allocation -
    25             $1,000,000)
    26             (Land Allocation - $100,000)
    27             (Design and Contingencies - $350,000)
    28         (84)  SR 0008, Muddy Creek Bridge, Clay
    29             Township, Bridge Rehabilitation             1,450,000
    30             (Base Construction Allocation -
    19990S0504B1471                 - 150 -

     1             $1,000,000)
     2             (Land Allocation - $100,000)
     3             (Design and Contingencies - $350,000)
     4         (85)  SR 0008, Glade Run Bridge No.3, Brady
     5             Township, Bridge Rehabilitation             1,450,000
     6             (Base Construction Allocation -
     7             $1,000,000)
     8             (Land Allocation - $100,000)
     9             (Design and Contingencies - $350,000)
    10         (86)  SR 0008, McDonalds Run Bridge, Mercer
    11             Township, Bridge Replacement                1,450,000
    12             (Base Construction Allocation -
    13             $1,000,000)
    14             (Land Allocation - $100,000)
    15             (Design and Contingencies - $350,000)
    16         (87)  SR 0008, McMurray Run Bridge, Mercer
    17             Township, Bridge Rehabilitation             1,450,000
    18             (Base Construction Allocation -
    19             $1,000,000)
    20             (Land Allocation - $100,000)
    21             (Design and Contingencies - $350,000)
    22         (88)  SR 0019, Glade Run Bridge No.2,
    23             Jackson Township, Bridge
    24             Rehabilitation                              1,050,000
    25             (Base Construction Allocation -
    26             $750,000)
    27             (Land Allocation - $50,000)
    28             (Design and Contingencies - $250,000)
    29         (89)  SR 0019, Glade Run Bridge No.2,
    30             Jackson Township, Bridge
    19990S0504B1471                 - 151 -

     1             Rehabilitation                              1,050,000
     2             (Base Construction Allocation -
     3             $750,000)
     4             (Land Allocation - $50,000)
     5             (Design and Contingencies - $250,000)
     6         (90)  SR 0038, Connoquenessing Creek
     7             Bridge, Center Township, Bridge
     8             Rehabilitation                              1,050,000
     9             (Base Construction Allocation -
    10             $750,000)
    11             (Land Allocation - $50,000)
    12             (Design and Contingencies - $250,000)
    13         (91)  SR 0038, Pine Run Bridge, Oakland
    14             Township, Bridge Rehabilitation             1,050,000
    15             (Base Construction Allocation -
    16             $750,000)
    17             (Land Allocation - $50,000)
    18             (Design and Contingencies - $250,000)
    19         (92)  SR 0038, Concord Bridge, Concord
    20             Township, Bridge Rehabilitation             1,050,000
    21             (Base Construction Allocation -
    22             $750,000)
    23             (Land Allocation - $50,000)
    24             (Design and Contingencies - $250,000)
    25         (93)  SR 0038, Little Connoquenessing Creek
    26             Bridge No.1, Concord Township, Bridge
    27             Rehabilitation                              1,050,000
    28             (Base Construction Allocation -
    29             $750,000)
    30             (Land Allocation - $50,000)
    19990S0504B1471                 - 152 -

     1             (Design and Contingencies - $250,000)
     2         (94)  SR 0038, Little Connoquenessing Creek
     3             Bridge, Concord Township, Bridge
     4             Rehabilitation                              1,050,000
     5             (Base Construction Allocation -
     6             $750,000)
     7             (Land Allocation - $50,000)
     8             (Design and Contingencies - $250,000)
     9         (95)  SR 0038, Little Scrubgrass Creek
    10             Bridge, Allegheny Township, Bridge
    11             Rehabilitation                              1,050,000
    12             (Base Construction Allocation -
    13             $750,000)
    14             (Land Allocation - $50,000)
    15             (Design and Contingencies - $250,000)
    16         (96)  SR 0038, Bridge over Tributary of
    17             Scrubgrass Creek, Allegheny Township,
    18             Bridge Rehabilitation                       1,050,000
    19             (Base Construction Allocation -
    20             $750,000)
    21             (Land Allocation - $50,000)
    22             (Design and Contingencies - $250,000)
    23         (97)  SR 0058, Murrin Run Bridge, Venango
    24             Township, Bridge Rehabilitation             1,050,000
    25             (Base Construction Allocation -
    26             $750,000)
    27             (Land Allocation - $50,000)
    28             (Design and Contingencies - $250,000)
    29         (98)  SR 0068, B&LE Railroad Bridge, Summit
    30             and Butler Townships, Bridge
    19990S0504B1471                 - 153 -

     1             Rehabilitation                              1,450,000
     2             (Base Construction Allocation -
     3             $1,000,000)
     4             (Land Allocation - $100,000)
     5             (Design and Contingencies - $350,000)
     6         (99)  SR 0068, Connoquenessing Creek
     7             Bridge, Summit Township, Bridge
     8             Rehabilitation                              1,050,000
     9             (Base Construction Allocation -
    10             $750,000)
    11             (Land Allocation - $50,000)
    12             (Design and Contingencies - $250,000)
    13         (100)  SR 0068, Buffalo Creek Bridge,
    14             Chicora Township, Bridge
    15             Rehabilitation                              1,050,000
    16             (Base Construction Allocation -
    17             $750,000)
    18             (Land Allocation - $50,000)
    19             (Design and Contingencies - $250,000)
    20         (101)  SR 0068, Buffalo Run Bridge,
    21             Fairview Township, Bridge
    22             Rehabilitation                              1,050,000
    23             (Base Construction Allocation -
    24             $750,000)
    25             (Land Allocation - $50,000)
    26             (Design and Contingencies - $250,000)
    27         (102)  SR 0079, Bridge over Tributary of
    28             Glade Run, Jackson Township, Bridge
    29             Rehabilitation                              1,450,000
    30             (Base Construction Allocation -
    19990S0504B1471                 - 154 -

     1             $1,000,000)
     2             (Land Allocation - $100,000)
     3             (Design and Contingencies - $350,000)
     4         (103)  SR 0079, Bridge No.1 over Branch of
     5             Yellow Creek, Lancaster Township,
     6             Bridge Rehabilitation                       1,450,000
     7             (Base Construction Allocation -
     8             $1,000,000)
     9             (Land Allocation - $100,000)
    10             (Design and Contingencies - $350,000)
    11         (104)  SR 0079, Bridge No.2 over Branch of
    12             Yellow Creek, Lancaster Township,
    13             Bridge Rehabilitation                       1,450,000
    14             (Base Construction Allocation -
    15             $1,000,000)
    16             (Land Allocation - $100,000)
    17             (Design and Contingencies - $350,000)
    18         (105)  SR 0079, Bridge No.3 over Branch of
    19             Yellow Creek, Lancaster Township,
    20             Bridge Rehabilitation                       1,450,000
    21             (Base Construction Allocation -
    22             $1,000,000)
    23             (Land Allocation - $100,000)
    24             (Design and Contingencies - $350,000)
    25         (106)  SR 0079, Little Yellow Creek Bridge,
    26             Lancaster Township, Bridge
    27             Rehabilitation                              1,450,000
    28             (Base Construction Allocation -
    29             $1,000,000)
    30             (Land Allocation - $100,000)
    19990S0504B1471                 - 155 -

     1             (Design and Contingencies - $350,000)
     2         (107)  SR 0079, Bridge No.4 over Branch of
     3             Yellow Creek, Muddycreek Township,
     4             Bridge Rehabilitation                       1,450,000
     5             (Base Construction Allocation -
     6             $1,000,000)
     7             (Land Allocation - $100,000)
     8             (Design and Contingencies - $350,000)
     9         (108)  SR 0079, Bridge at Milepost 100,
    10             Worth Township, Bridge Rehabilitation       1,450,000
    11             (Base Construction Allocation -
    12             $1,000,000)
    13             (Land Allocation - $100,000)
    14             (Design and Contingencies - $350,000)
    15         (109)  SR 0079, Black Run Bridge, Worth
    16             Township, Bridge Rehabilitation             1,450,000
    17             (Base Construction Allocation -
    18             $1,000,000)
    19             (Land Allocation - $100,000)
    20             (Design and Contingencies - $350,000)
    21         (110)  SR 0268, Bridge over Branch of Bear
    22             Creek, Petrolia Borough, Bridge
    23             Rehabilitation                              1,050,000
    24             (Base Construction Allocation -
    25             $750,000)
    26             (Land Allocation - $50,000)
    27             (Design and Contingencies - $250,000)
    28         (111)  SR 0268, Lowrey Run Bridge,
    29             Allegheny Township, Bridge
    30             Rehabilitation                              1,050,000
    19990S0504B1471                 - 156 -

     1             (Base Construction Allocation -
     2             $750,000)
     3             (Land Allocation - $50,000)
     4             (Design and Contingencies - $250,000)
     5         (112)  SR 0308, B&LE Railroad Bridge,
     6             Center Township, Bridge Rehabilitation      1,050,000
     7             (Base Construction Allocation -
     8             $750,000)
     9             (Land Allocation - $50,000)
    10             (Design and Contingencies - $250,000)
    11         (113)  SR 0308, Stony Run Bridge, Center
    12             Township, Bridge Rehabilitation             1,050,000
    13             (Base Construction Allocation -
    14             $750,000)
    15             (Land Allocation - $50,000)
    16             (Design and Contingencies - $250,000)
    17         (114)  SR 0356, Little Buffalo Creek
    18             Bridge, Buffalo Township, Bridge
    19             Rehabilitation                              1,050,000
    20             (Base Construction Allocation -
    21             $750,000)
    22             (Land Allocation - $50,000)
    23             (Design and Contingencies - $250,000)
    24         (115)  SR 0356, Big Coal Run Bridge, Summit
    25             Township, Bridge Rehabilitation             1,050,000
    26             (Base Construction Allocation -
    27             $750,000)
    28             (Land Allocation - $50,000)
    29             (Design and Contingencies - $250,000)
    30         (116)  SR 0422, Lake Arthur Bridge,
    19990S0504B1471                 - 157 -

     1             Franklin Township, Bridge
     2             Rehabilitation                              1,450,000
     3             (Base Construction Allocation -
     4             $1,000,000)
     5             (Land Allocation - $100,000)
     6             (Design and Contingencies - $350,000)
     7         (117)  SR 0422, Big Run Bridge, Franklin
     8             Township, Bridge Rehabilitation             1,450,000
     9             (Base Construction Allocation -
    10             $1,000,000)
    11             (Land Allocation - $100,000)
    12             (Design and Contingencies - $350,000)
    13         (118)  SR 0422, Mulligan Run Bridge,
    14             Franklin Township, Bridge
    15             Rehabilitation                              1,450,000
    16             (Base Construction Allocation -
    17             $1,000,000)
    18             (Land Allocation - $100,000)
    19             (Design and Contingencies - $350,000)
    20         (119)  SR 0422, Big Mulligan Run Bridge,
    21             Franklin Township, Bridge
    22             Rehabilitation                              1,450,000
    23             (Base Construction Allocation -
    24             $1,000,000)
    25             (Land Allocation - $100,000)
    26             (Design and Contingencies - $350,000)
    27         (120)  SR 0422, Big Sullivan Run Bridge,
    28             Butler Township, Bridge Rehabilitation      1,450,000
    29             (Base Construction Allocation -
    30             $1,000,000)
    19990S0504B1471                 - 158 -

     1             (Land Allocation - $100,000)
     2             (Design and Contingencies - $350,000)
     3         (121)  SR 0422, Connoquenessing Creek
     4             Bridge, Butler Township, Bridge
     5             Rehabilitation                              1,450,000
     6             (Base Construction Allocation -
     7             $1,000,000)
     8             (Land Allocation - $100,000)
     9             (Design and Contingencies - $350,000)
    10         (122)  SR 0422, Bridge No.1 over Tributary
    11             of Connoquenessing Creek, Summit
    12             Township, Bridge Rehabilitation             1,450,000
    13             (Base Construction Allocation -
    14             $1,000,000)
    15             (Land Allocation - $100,000)
    16             (Design and Contingencies - $350,000)
    17         (123)  SR 0422, Bridge No.2 over Tributary
    18             of Bonnie Brook, Butler Township,
    19             Bridge Rehabilitation                       1,450,000
    20             (Base Construction Allocation -
    21             $1,000,000)
    22             (Land Allocation - $100,000)
    23             (Design and Contingencies - $350,000)
    24         (124)  SR 0422, Bonnie Brook Bridge No.1,
    25             Summit Township, Bridge Rehabilitation      1,450,000
    26             (Base Construction Allocation -
    27             $1,000,000)
    28             (Land Allocation - $100,000)
    29             (Design and Contingencies - $350,000)
    30         (125)  SR 0422, Bridge No.3 over Tributary
    19990S0504B1471                 - 159 -

     1             of Bonnie Brook, Summit Township,
     2             Bridge Rehabilitation                       1,450,000
     3             (Base Construction Allocation -
     4             $1,000,000)
     5             (Land Allocation - $100,000)
     6             (Design and Contingencies - $350,000)
     7         (126)  SR 0422, Bonnie Brook Bridge No.2,
     8             Summit Township, Bridge Rehabilitation      1,450,000
     9             (Base Construction Allocation -
    10             $1,000,000)
    11             (Land Allocation - $100,000)
    12             (Design and Contingencies - $350,000)
    13         (127)  SR 0422, Bridge No.4 over Tributary
    14             of Bonnie Brook, Summit Township,
    15             Bridge Rehabilitation                       1,450,000
    16             (Base Construction Allocation -
    17             $1,000,000)
    18             (Land Allocation - $100,000)
    19             (Design and Contingencies - $350,000)
    20         (128)  SR 0422, Little Buffalo Creek
    21             Bridge, Clearfield Township, Bridge
    22             Rehabilitation                              1,450,000
    23             (Base Construction Allocation -
    24             $1,000,000)
    25             (Land Allocation - $100,000)
    26             (Design and Contingencies - $350,000)
    27         (129)  SR 0422, Buffalo Creek Bridge,
    28             Clearfield Township, Bridge
    29             Rehabilitation                              1,450,000
    30             (Base Construction Allocation -
    19990S0504B1471                 - 160 -

     1             $1,000,000)
     2             (Land Allocation - $100,000)
     3             (Design and Contingencies - $350,000)
     4         (130)  SR 0528, Likens Run Bridge, Evans
     5             City Borough, Bridge Rehabilitation         1,050,000
     6             (Base Construction Allocation -
     7             $750,000)
     8             (Land Allocation - $50,000)
     9             (Design and Contingencies - $250,000)
    10         (131)  SR 1010, Glade Run Bridge, Brady
    11             Township, Bridge Rehabilitation               595,000
    12             (Base Construction Allocation -
    13             $400,000)
    14             (Land Allocation - $20,000)
    15             (Design and Contingencies - $175,000)
    16         (132)  SR 1010, Big Bear Creek Bridge,
    17             Fairview Township, Bridge
    18             Rehabilitation                                595,000
    19             (Base Construction Allocation -
    20             $400,000)
    21             (Land Allocation - $20,000)
    22             (Design and Contingencies - $175,000)
    23         (133)  SR 1011, Buffalo Creek Bridge,
    24             Fairview Township, Bridge
    25             Rehabilitation                                595,000
    26             (Base Construction Allocation -
    27             $400,000)
    28             (Land Allocation - $20,000)
    29             (Design and Contingencies - $175,000)
    30         (134)  SR 1019, Big Buffalo Run Bridge,
    19990S0504B1471                 - 161 -

     1             Donegal Township, Bridge
     2             Rehabilitation                              1,050,000
     3             (Base Construction Allocation -
     4             $750,000)
     5             (Land Allocation - $50,000)
     6             (Design and Contingencies - $250,000)
     7         (135)  SR 1025, Bonnie Brook Bridge, Summit
     8             Township, Bridge Rehabilitation             1,050,000
     9             (Base Construction Allocation -
    10             $750,000)
    11             (Land Allocation - $50,000)
    12             (Design and Contingencies - $250,000)
    13         (136)  SR 2002, Coal Run Bridge, City of
    14             Butler and Butler Township, Bridge
    15             Rehabilitation                              1,050,000
    16             (Base Construction Allocation -
    17             $750,000)
    18             (Land Allocation - $50,000)
    19             (Design and Contingencies - $250,000)
    20         (137)  SR 2004, Bonnie Brook Bridge, Summit
    21             Township, Bridge Rehabilitation             1,050,000
    22             (Base Construction Allocation -
    23             $750,000)
    24             (Land Allocation - $50,000)
    25             (Design and Contingencies - $250,000)
    26         (138)  SR 2012, Thorn Creek Bridge No.1,
    27             Jefferson Township, Bridge
    28             Rehabilitation                              1,050,000
    29             (Base Construction Allocation -
    30             $750,000)
    19990S0504B1471                 - 162 -

     1             (Land Allocation - $50,000)
     2             (Design and Contingencies - $250,000)
     3         (139)  SR 2012, Thorn Creek Bridge No.2,
     4             Jefferson Township, Bridge
     5             Rehabilitation                              1,050,000
     6             (Base Construction Allocation -
     7             $750,000)
     8             (Land Allocation - $50,000)
     9             (Design and Contingencies - $250,000)
    10         (140)  SR 3001, West Butler Creek Bridge,
    11             Butler Township, Bridge Rehabilitation      1,450,000
    12             (Base Construction Allocation -
    13             $1,000,000)
    14             (Land Allocation - $100,000)
    15             (Design and Contingencies - $350,000)
    16         (141)  SR 3007, Thorn Creek Bridge, Butler
    17             Township, Bridge Rehabilitation             1,050,000
    18             (Base Construction Allocation -
    19             $750,000)
    20             (Land Allocation - $50,000)
    21             (Design and Contingencies - $250,000)
    22         (142)  SR 3009, Cranberry Run Bridge, Penn
    23             Township, Bridge Rehabilitation               595,000
    24             (Base Construction Allocation -
    25             $400,000)
    26             (Land Allocation - $20,000)
    27             (Design and Contingencies - $175,000)
    28         (143)  SR 3010, Saw Mill Run Bridge, Penn
    29             Township, Bridge Rehabilitation               595,000
    30             (Base Construction Allocation -
    19990S0504B1471                 - 163 -

     1             $400,000)
     2             (Land Allocation - $20,000)
     3             (Design and Contingencies - $175,000)
     4         (144)  SR 3015, Bridge No.2 over Tributary
     5             of Wolf Run, Forward Township, Bridge
     6             Rehabilitation                              1,050,000
     7             (Base Construction Allocation -
     8             $750,000)
     9             (Land Allocation - $50,000)
    10             (Design and Contingencies - $250,000)
    11         (145)  SR 3015, Bridge No.3 over Tributary
    12             of Wolf Run, Forward Township, Bridge
    13             Rehabilitation                              1,050,000
    14             (Base Construction Allocation -
    15             $750,000)
    16             (Land Allocation - $50,000)
    17             (Design and Contingencies - $250,000)
    18         (146)  SR 3025, Bridge over Branch of
    19             Yellow Creek, Lancaster Township,
    20             Bridge Rehabilitation                         595,000
    21             (Base Construction Allocation -
    22             $400,000)
    23             (Land Allocation - $20,000)
    24             (Design and Contingencies - $175,000)
    25         (147)  SR 3031, SR 3031 over US 422, Butler
    26             Township, Bridge Rehabilitation               595,000
    27             (Base Construction Allocation -
    28             $400,000)
    29             (Land Allocation - $20,000)
    30             (Design and Contingencies - $175,000)
    19990S0504B1471                 - 164 -

     1         (148)  SR 3034, Bridge over Branch of
     2             Semiconon, Prospect Borough, Bridge
     3             Rehabilitation                                595,000
     4             (Base Construction Allocation -
     5             $400,000)
     6             (Land Allocation - $20,000)
     7             (Design and Contingencies - $175,000)
     8         (149)  SR 4001, SR 4001 over US 422, Butler
     9             Township, Bridge Rehabilitation             1,050,000
    10             (Base Construction Allocation -
    11             $750,000)
    12             (Land Allocation - $50,000)
    13             (Design and Contingencies - $250,000)
    14         (150)  SR 4002, Bridge over Branch of Muddy
    15             Creek, Clay Township, Bridge
    16             Rehabilitation                              1,050,000
    17             (Base Construction Allocation -
    18             $750,000)
    19             (Land Allocation - $50,000)
    20             (Design and Contingencies - $250,000)
    21         (151)  T-716, Old Plank Road Bridge, Penn
    22             Township, Bridge Replacement                  390,000
    23             (Base Construction Allocation -
    24             $300,000)
    25             (Land Allocation - $10,000)
    26             (Design and Contingencies - $80,000)
    27         (152)  SR 3007, Crooked Run Bridge, Center
    28             Township, Bridge Replacement                1,050,000
    29             (Base Construction Allocation -
    30             $750,000)
    19990S0504B1471                 - 165 -

     1             (Land Allocation - $50,000)
     2             (Design and Contingencies - $250,000)
     3         (153)  SR 3010, Glade Run Bridge, Forward
     4             Township, Bridge Replacement                  595,000
     5             (Base Construction Allocation -
     6             $400,000)
     7             (Land Allocation - $20,000)
     8             (Design and Contingencies - $175,000)
     9         (154)  SR 3013, Big Connoquenessing Bridge,
    10             Forward Township, Bridge Replacement          595,000
    11             (Base Construction Allocation -
    12             $400,000)
    13             (Land Allocation - $20,000)
    14             (Design and Contingencies - $175,000)
    15         (155)  SR 0019, SR 0019 over Brush Creek,
    16             Cranberry Township, Bridge Replacement      1,050,000
    17             (Base Construction Allocation -
    18             $800,000)
    19             (Land Allocation - $75,000)
    20             (Design and Contingencies - $175,000)
    21         (156)  SR 0079, SR 0079 over Big Brush
    22             Creek, Cranberry Township, Bridge
    23             Replacement                                 1,450,000
    24             (Base Construction Allocation -
    25             $1,100,000)
    26             (Land Allocation - $75,000)
    27             (Design and Contingencies - $275,000)
    28         (157)  SR 0079, SR 0079 over Coal Run,
    29             Cranberry Township, Bridge Replacement      1,450,000
    30             (Base Construction Allocation -
    19990S0504B1471                 - 166 -

     1             $1,100,000)
     2             (Land Allocation - $75,000)
     3             (Design and Contingencies - $275,000)
     4         (158)  SR 0228, SR 0228 over CSX Railroad,
     5             Adams Township, Bridge Replacement          1,450,000
     6             (Base Construction Allocation -
     7             $1,100,000)
     8             (Land Allocation - $75,000)
     9             (Design and Contingencies - $275,000)
    10         (159)  SR 3015, Breakneck Bridge, Adams
    11             Township, Bridge Replacement                  595,000
    12             (Base Construction Allocation -
    13             $400,000)
    14             (Land Allocation - $20,000)
    15             (Design and Contingencies - $175,000)
    16         (160)  SR 3022, SR 3022 over Brush Creek,
    17             Cranberry Township, Bridge Replacement      1,050,000
    18             (Base Construction Allocation -
    19             $800,000)
    20             (Land Allocation - $75,000)
    21             (Design and Contingencies - $175,000)
    22         (161)  SR 3024, SR 3024 over Big Brush
    23             Creek, Cranberry Township, Bridge
    24             Replacement                                   595,000
    25             (Base Construction Allocation -
    26             $400,000)
    27             (Land Allocation - $20,000)
    28             (Design and Contingencies - $175,000)
    29         (162)  SR 0008, Bridge over US 422, Butler
    30             Township, Bridge Rehabilitation             1,450,000
    19990S0504B1471                 - 167 -

     1             (Base Construction Allocation -
     2             $1,000,000)
     3             (Land Allocation - $100,000)
     4             (Design and Contingencies - $350,000)
     5         (163)  SR 0028, Bridge over SR 2017,
     6             Buffalo Township, Bridge
     7             Rehabilitation                              1,450,000
     8             (Base Construction Allocation -
     9             $1,000,000)
    10             (Land Allocation - $100,000)
    11             (Design and Contingencies - $350,000)
    12         (164)  SR 0068, Chicora South Bridge No.2
    13             over Buffalo Creek, Chicora Borough,
    14             Bridge Replacement                            610,000
    15             (Base Construction Allocation -
    16             $500,000)
    17             (Land Allocation - $10,000)
    18             (Design and Contingencies - $100,000)
    19         (165)  SR 0068, Chicora South Bridge No.1
    20             over Tributary of Buffalo Creek,
    21             Chicora Borough, Bridge Replacement           610,000
    22             (Base Construction Allocation -
    23             $500,000)
    24             (Land Allocation - $10,000)
    25             (Design and Contingencies - $100,000)
    26         (166)  SR 0228, Breakneck Creek Bridge over
    27             Breakneck Creek, Adams Township, Bridge
    28             Replacement                                   610,000
    29             (Base Construction Allocation -
    30             $500,000)
    19990S0504B1471                 - 168 -

     1             (Land Allocation - $10,000)
     2             (Design and Contingencies - $100,000)
     3         (167)  SR 1011, Bonnie Run Bridge over
     4             Branch Bonnie Run, East Butler Borough,
     5             Bridge Rehabilitation                         590,000
     6             (Base Construction Allocation -
     7             $500,000)
     8             (Land Allocation - $20,000)
     9             (Design and Contingencies - $70,000)
    10         (168)  SR 1019, Rough Run Bridge over Rough
    11             Run, Windfield Township, Bridge
    12             Replacement                                   440,000
    13             (Base Construction Allocation -
    14             $350,000)
    15             (Land Allocation - $20,000)
    16             (Design and Contingencies - $70,000)
    17         (169)  SR 2006, Butler Interchange Bridge
    18             Eastbound over US 422, Summit Township,
    19             Bridge Replacement                          2,500,000
    20             (Base Construction Allocation -
    21             $2,000,000)
    22             (Land Allocation - $100,000)
    23             (Design and Contingencies - $400,000)
    24         (170)  SR 4007, Muddy Creek Bridge over
    25             Muddy Creek, Worth Township, Bridge
    26             Replacement                                   820,000
    27             (Base Construction Allocation -
    28             $700,000)
    29             (Land Allocation - $20,000)
    30             (Design and Contingencies - $100,000)
    19990S0504B1471                 - 169 -

     1         (171)  SR 4007, Bridge over I-79, Worth
     2             Township, Bridge Rehabilitation             1,050,000
     3             (Base Construction Allocation -
     4             $750,000)
     5             (Land Allocation - $50,000)
     6             (Design and Contingencies - $250,000)
     7         (172)  SR 4007, Bridge over I-79, Worth
     8             Township, Bridge Rehabilitation             1,050,000
     9             (Base Construction Allocation -
    10             $750,000)
    11             (Land Allocation - $50,000)
    12             (Design and Contingencies - $250,000)
    13         (173)  SR 0528, Bridge (Northbound and
    14             Southbound) over I-79, Jackson
    15             Township, Bridge Rehabilitation               915,000
    16             (Base Construction Allocation -
    17             $750,000)
    18             (Land Allocation - $25,000)
    19             (Design and Contingencies - $140,000)
    20         (174)  PA 528, Bridge over I-79 Southbound,
    21             Jackson Township, Bridge
    22             Rehabilitation                                183,000
    23             (Base Construction Allocation -
    24             $150,000)
    25             (Land Allocation - $5,000)
    26             (Design and Contingencies - $28,000)
    27         (175)  PA 528, Bridge over I-79 Northbound,
    28             Jackson Township, Bridge
    29             Rehabilitation                                183,000
    30             (Base Construction Allocation -
    19990S0504B1471                 - 170 -

     1             $150,000)
     2             (Land Allocation - $5,000)
     3             (Design and Contingencies - $28,000)
     4         (176)  SR 3024, Bridge over Branch Brush
     5             Creek, Cranberry Township, Bridge
     6             Replacement                                   515,000
     7             (Base Construction Allocation -
     8             $425,000)
     9             (Land Allocation - $30,000)
    10             (Design and Contingencies - $60,000)
    11         (177)  SR 0019, TURNPIKE RAMP OVERPASS,                    <--
    12             TURNPIKE CONNECTOR, CRANBERRY TOWNSHIP,
    13             BRIDGE REPLACEMENT                          1,400,000
    14             (BASE CONSTRUCTION ALLOCATION -
    15             $800,000)
    16             (LAND ALLOCATION - $300,000)
    17             (DESIGN AND CONTINGENCIES - $300,000)
    18         (178)  SR 0219, B&P RAILROAD OVERPASS,
    19             JOHNSONBURG TOWNSHIP, BRIDGE
    20             REHABILITATION                              3,550,000
    21             (BASE CONSTRUCTION ALLOCATION -
    22             $2,675,000)
    23             (DESIGN AND CONTINGENCIES - $875,000)
    24         (179)  SR 0068, B&P RAILROAD OVERPASS,
    25             CHICORA TOWNSHIP, BRIDGE REPLACEMENT        2,900,000
    26             (BASE CONSTRUCTION ALLOCATION -
    27             $2,190,000)
    28             (DESIGN AND CONTINGENCIES - $710,000)
    29         (180)  SR 4023, SR 1033, B&P RAILROAD
    30             OVERPASS, EAST FRANKLIN TOWNSHIP AND
    19990S0504B1471                 - 171 -

     1             RAYBURN TOWNSHIP, BRIDGE
     2             REHABILITATION                              1,100,000
     3             (BASE CONSTRUCTION ALLOCATION -
     4             $825,000)
     5             (DESIGN AND CONTINGENCIES - $275,000)
     6         (181)  SR 0036, B&P RAILROAD OVERPASS,
     7             PUNXSUTAWNEY TOWNSHIP, BRIDGE
     8             REHABILITATION                                860,000
     9             (BASE CONSTRUCTION ALLOCATION -
    10             $650,000)
    11             (DESIGN AND CONTINGENCIES - $210,000)
    12         (182)  T-392, BRIDGE OVER B&P RAILROAD,
    13             WEST MAHONING TOWNSHIP, BRIDGE
    14             REPLACEMENT                                   600,000
    15             (BASE CONSTRUCTION ALLOCATION -
    16             $450,000)
    17             (DESIGN AND CONTINGENCIES - $150,000)
    18         (183)  MONROE STREET BRIDGE OVER B&P
    19             RAILROAD, BUTLER TOWNSHIP, BRIDGE
    20             REPLACEMENT                                 1,850,000
    21             (BASE CONSTRUCTION ALLOCATION -
    22             $1,400,000)
    23             (DESIGN AND CONTINGENCIES - $450,000)
    24         (184)  T-501, BRIDGE OVER B&P RAILROAD,
    25             EAST FRANKLIN TOWNSHIP, BRIDGE
    26             REPLACEMENT                                   600,000
    27             (BASE CONSTRUCTION ALLOCATION -
    28             $450,000)
    29             (DESIGN AND CONTINGENCIES - $150,000)
    30         (185)  SR 0268, BRIDGE OVER B&P RAILROAD,
    19990S0504B1471                 - 172 -

     1             EAST FRANKLIN TOWNSHIP, BRIDGE
     2             REPLACEMENT                                 2,050,000
     3             (BASE CONSTRUCTION ALLOCATION -
     4             $500,000)
     5             (DESIGN AND CONTINGENCIES - $1,550,000)
     6  Section 15.  Cambria County
     7     (a)  Local Bridges
     8         (1)  Summerhill Township, T-346, Bridge
     9             No.1, Howard Avenue over Beaverdam Run,
    10             Bridge Replacement                            450,000
    11             (Base Construction Allocation -
    12             $350,000)
    13             (Design and Contingencies - $100,000)
    14         (2)  West Carroll Township, T-505 over
    15             Blacklick Creek, Bridge Replacement           235,000
    16             (Base Construction Allocation -
    17             $200,000)
    18             (Land Allocation - $10,000)
    19             (Design and Contingencies - $25,000)
    20         (3)  West Carroll Township, T-626 over Fox
    21             Run, Bridge Replacement                       235,000
    22             (Base Construction Allocation -
    23             $200,000)
    24             (Land Allocation - $10,000)
    25             (Design and Contingencies - $25,000)
    26         (4)  BARR TOWNSHIP, T-509, BRIDGE OVER                     <--
    27             NORTH BRANCH OF BLACKLICK CREEK, BRIDGE
    28             REPLACEMENT                                   570,000
    29             (BASE CONSTRUCTION ALLOCATION -
    30             $450,000)
    19990S0504B1471                 - 173 -

     1             (LAND ALLOCATION - $30,000)
     2             (DESIGN AND CONTINGENCIES - $90,000)
     3         (5)  ALLEGHENY TOWNSHIP, T-453 OVER
     4             CLEARFIELD CREEK, BRIDGE REPLACEMENT          450,000
     5             (BASE CONSTRUCTION ALLOCATION -
     6             $345,000)
     7             (LAND ALLOCATION - $5,000)
     8             (DESIGN AND CONTINGENCIES - $100,000)
     9         (6)  SUSQUEHANNA TOWNSHIP, BRIDGE NO.2, T-
    10             550 OVER MOSS CREEK, BRIDGE
    11             REPLACEMENT                                   270,000
    12             (BASE CONSTRUCTION ALLOCATION -
    13             $185,000)
    14             (LAND ALLOCATION - $10,000)
    15             (DESIGN AND CONTINGENCIES - $75,000)
    16     (b)  State Bridges
    17         (1)  SR 1030, Carl Road over Slate Lick
    18             Creek, Clearfield Township, Bridge
    19             Replacement                                   240,000
    20             (Base Construction Allocation -
    21             $200,000)
    22             (Land Allocation - $10,000)
    23             (Design and Contingencies - $30,000)
    24         (2)  SR 0271, Maple Avenue Bridge over
    25             Little Conemaugh River and Conrail,
    26             Phase II, City of Johnstown, Bridge
    27             Painting                                      500,000
    28             (Base Construction Allocation -
    29             $500,000)
    30         (3)  SR 3033, PA 56 Detour Bridge over
    19990S0504B1471                 - 174 -

     1             Solomon Run, Richland Township, Bridge
     2             Replacement                                   350,000
     3             (Base Construction Allocation -
     4             $250,000)
     5             (Land Allocation - $15,000)
     6             (Design and Contingencies - $85,000)
     7         (4)  SR 0403, Stonycreek Bridge over
     8             Stonycreek River, City of Johnstown,
     9             Bridge Replacement                          3,600,000
    10             (Base Construction Allocation -
    11             $2,915,000)
    12             (Land Allocation - $195,000)
    13             (Design and Contingencies - $490,000)
    14         (5)  SR 3006, Stonycreek Bridge over
    15             Tributary of Stonycreek River, Richland
    16             Township, Bridge Rehabilitation                56,000
    17             (Base Construction Allocation -
    18             $41,000)
    19             (Land Allocation - $1,000)
    20             (Design and Contingencies - $14,000)
    21         (6)  SR 4010, Brubaker Bridge over Brubaker
    22             Run, Hastings Borough, Bridge
    23             Rehabilitation                                 50,000
    24             (Base Construction Allocation -
    25             $36,000)
    26             (Land Allocation - $1,000)
    27             (Design and Contingencies - $13,000)
    28         (7)  SR 1001, Ebensburg Bridge over Howells
    29             Run, Ebensburg Borough, Bridge
    30             Rehabilitation                                350,000
    19990S0504B1471                 - 175 -

     1             (Base Construction Allocation -
     2             $300,000)
     3             (Land Allocation - $1,000)
     4             (Design and Contingencies - $49,000)
     5  Section 16.  Cameron County.
     6     (a)  Local Bridges
     7         (1)  Shippen Township, T-345, Hercules
     8             Hollow Bridge over West Creek, Bridge
     9             Replacement                                   760,000
    10             (Base Construction Allocation -
    11             $600,000)
    12             (Land Allocation - $10,000)
    13             (Design and Contingencies - $150,000)
    14         (2)  Grove Township, T-355, Bridge over
    15             Upper Jerry Run, Bridge Replacement           224,000
    16             (Base Construction Allocation -
    17             $160,000)
    18             (Land Allocation - $8,000)
    19             (Design and Contingencies - $56,000)
    20     (b)  State Bridges
    21         (1)  SR 0120, Bridge over Still House Run,
    22             Lumber Township, Bridge Replacement           400,000
    23             (Base Construction Allocation -
    24             $250,000)
    25             (Land Allocation - $50,000)
    26             (Design and Contingencies - $100,000)
    27         (2)  SR 4004, Bridge over Driftwood Branch,
    28             Shippen Township, Bridge Painting             115,000
    29             (Base Construction Allocation -
    30             $110,000)
    19990S0504B1471                 - 176 -

     1             (Design and Contingencies - $5,000)
     2         (3)  SR 4004, Elk Fork Bridge over
     3             Driftwood Branch, Shippen Township,
     4             Bridge Replacement                            130,000
     5             (Base Construction Allocation -
     6             $100,000)
     7             (Land Allocation - $10,000)
     8             (Design and Contingencies - $20,000)
     9         (4)  SR 2001, Bridge over White Oak, Gibson
    10             Township, Bridge Replacement                  540,000
    11             (Base Construction Allocation -
    12             $400,000)
    13             (Land Allocation - $20,000)
    14             (Design and Contingencies - $120,000)
    15         (5)  SR 2001, Bridge over Laurel Branch,
    16             Gibson Township, Bridge Replacement           540,000
    17             (Base Construction Allocation -
    18             $400,000)
    19             (Land Allocation - $20,000)
    20             (Design and Contingencies - $120,000)
    21  Section 17.  Carbon County.
    22     (a)  Local Bridges
    23         (1)  Penn Forest Township, T-481, County
    24             Bridge No.21 over Panther Creek, Bridge
    25             Replacement                                   290,000
    26             (Base Construction Allocation -
    27             $180,000)
    28             (Land Allocation - $10,000)
    29             (Design and Contingencies - $100,000)
    30         (2)  Mahoning Township, T-390, Bridge over
    19990S0504B1471                 - 177 -

     1             Mahoning Creek, Bridge Replacement             92,000
     2             (Base Construction Allocation -
     3             $80,000)
     4             (Land Allocation - $4,000)
     5             (Design and Contingencies - $8,000)
     6         (3)  Lausanne Township, T-502, Bridge over
     7             Schaffers Run, Bridge Replacement             320,000
     8             (Base Construction Allocation -
     9             $212,000)
    10             (Land Allocation - $8,000)
    11             (Design and Contingencies - $100,00)
    12         (4)  Towamensing Township, T-435, Bridge
    13             over Wild Creek, Bridge Replacement           357,000
    14             (Base Construction Allocation -
    15             $220,000)
    16             (Land Allocation - $9,000)
    17             (Design and Contingencies - $128,000)
    18         (5)  Bowmanstown Borough, Ore Street Bridge
    19             over Fireline Creek, Bridge
    20             Replacement                                   360,000
    21             (Base Construction Allocation -
    22             $250,000)
    23             (Land Allocation - $10,000)
    24             (Design and Contingencies - $100,000)
    25         (6)  Packer Township, T-463, Bridge over
    26             Wetzel Creek, Bridge Replacement              360,000
    27             (Base Construction Allocation -
    28             $250,000)
    29             (Land Allocation - $10,000)
    30             (Design and Contingencies - $100,000)
    19990S0504B1471                 - 178 -

     1         (7)  East Penn Township, T-354, County
     2             Bridge No.6 over Lizard Creek, Bridge
     3             Replacement                                   974,000
     4             (Base Construction Allocation -
     5             $600,000)
     6             (Land Allocation - $300,000)
     7             (Design and Contingencies - $74,000)
     8         (8)  Lehigh Township, Leslie Run Road over
     9             Leslie Run, Bridge Replacement                110,000
    10     (b)  State Bridges
    11         (1)  SR 2002, Delaware Avenue over Palmer
    12             Creek, Palmerton Borough, Bridge
    13             Replacement                                   568,000
    14             (Base Construction Allocation -
    15             $318,000)
    16             (Land Allocation - $150,000)
    17             (Design and Contingencies - $100,000)
    18         (2)  SR 4010, SR 4010 over Quakake Creek,
    19             Packer Township, Bridge Replacement           412,000
    20             (Base Construction Allocation -
    21             $202,000)
    22             (Land Allocation - $150,000)
    23             (Design and Contingencies - $60,000)
    24         (3)  SR 0209, SR 0209 Turnpike Ramp,
    25             Mahoning Interchange, Franklin
    26             Township, Bridge Replacement                1,260,000
    27             (Base Construction Allocation -
    28             $750,000)
    29             (Land Allocation - $300,000)
    30             (Design and Contingencies - $210,000)
    19990S0504B1471                 - 179 -

     1         (4)  SR 0248, SR 0248 over Pohopoco Creek,
     2             Parryville Borough Line, Lower
     3             Towamensing Township, Bridge
     4             Rehabilitation                                415,000
     5             (Base Construction Allocation -
     6             $315,000)
     7             (Design and Contingencies - $100,000)
     8         (5)  SR 4010, SR 4010 over Hartz Creek,
     9             Packer Township, Bridge Replacement           615,000
    10             (Base Construction Allocation -
    11             $370,000)
    12             (Land Allocation - $150,000)
    13             (Design and Contingencies - $95,000)
    14         (6)  SR 0534, SR 0534 over Sand Spring Run,
    15             2 Miles South of Lehigh Tannery, Kidder
    16             Township, Bridge Replacement                  340,000
    17             (Base Construction Allocation -
    18             $160,000)
    19             (Land Allocation - $125,000)
    20             (Design and Contingencies - $55,000)
    21         (7)  SR 0209, SR 0209 over Pohopoco Creek,
    22             Village of Harrity, Franklin Township,
    23             Bridge Rehabilitation                         885,000
    24             (Base Construction Allocation -
    25             $680,000)
    26             (Design and Contingencies - $205,000)
    27         (8)  SR 0534, Pa 534 over I-80, Kidder
    28             Township, Bridge Rehabilitation               540,000
    29             (Base Construction Allocation -
    30             $440,000)
    19990S0504B1471                 - 180 -

     1             (Design and Contingencies - $100,000)
     2         (9)  SR 0248, Bridge over Aquashicola
     3             Creek, Lower Towamensing Township,
     4             Bridge Rehabilitation                         310,000
     5             (Base Construction Allocation -
     6             $300,000)
     7             (Design and Contingencies - $10,000)
     8         (10)  SR 0534, Bridge over Hickory Run,
     9             Kidder Township, Bridge Rehabilitation        830,000
    10             (Base Construction Allocation -
    11             $700,000)
    12             (Land Allocation - $30,000)
    13             (Design and Contingencies - $100,000)
    14         (11)  SR 0903, Bridge over Lehigh River,
    15             Jim Thorpe Borough, Bridge
    16             Rehabilitation                              1,250,000
    17             (Base Construction Allocation -
    18             $1,000,000)
    19             (Land Allocation - $50,000)
    20             (Design and Contingencies - $200,000)
    21         (12)  SR 0940, Bridge over Black Creek,
    22             Kidder Township, Bridge Replacement           185,000
    23             (Base Construction Allocation -
    24             $150,000)
    25             (Design and Contingencies - $35,000)
    26         (13)  SR 2006, Bridge over Buckwha Creek,
    27             Lower Towamensing Township, Bridge
    28             Replacement                                 1,240,000
    29             (Base Construction Allocation -
    30             $700,000)
    19990S0504B1471                 - 181 -

     1             (Land Allocation - $90,000)
     2             (Design and Contingencies - $450,000)
     3         (14)  SR 2008, Bridge over Pohopoco Creek,
     4             Parryville Borough, Bridge Replacement        920,000
     5             (Base Construction Allocation -
     6             $600,000)
     7             (Land Allocation - $90,000)
     8             (Design and Contingencies - $230,000)
     9         (15)  SR 3005, Bridge over Mahoning Creek,
    10             Mahoning Township, Bridge Replacement         308,000
    11             (Base Construction Allocation -
    12             $280,000)
    13             (Design and Contingencies - $28,000)
    14         (16)  SR 4014, Bridge over Tributary of
    15             Indian Run, Lehigh Township, Bridge
    16             Replacement                                   153,000
    17             (Base Construction Allocation -
    18             $130,000)
    19             (Land Allocation - $10,000)
    20             (Design and Contingencies - $13,000)
    21         (17)  SR 4014, Bridge over Tributary of
    22             Indian Run, Lehigh Township, Bridge
    23             Replacement                                    88,000
    24             (Base Construction Allocation -
    25             $80,000)
    26             (Design and Contingencies - $8,000)
    27         (18)  SR 2002, Bridge over Chestnut Ridge
    28             Railroad, Palmerton Borough, Bridge
    29             Deck Rehabilitation                           500,000
    30             (Base Construction Allocation -
    19990S0504B1471                 - 182 -

     1             $500,000)
     2  Section 18.  Centre County.
     3     (a)  Local Bridges
     4         (1)  Greene Township, T-350, Stover Road
     5             Bridge, Bridge Replacement                    230,000
     6             (Base Construction Allocation -
     7             $180,000)
     8             (Land Allocation - $10,000)
     9             (Design and Contingencies - $40,000)
    10         (2)  Howard Township, T-398 over Bullit
    11             Run, Bridge Rehabilitation                     11,000
    12             (Base Construction Allocation - $9,000)
    13             (Design and Contingencies - $2,000)
    14         (3)  Halfmoon Township, T-307 over
    15             Loveville Creek, Bridge Replacement            21,000
    16             (Base Construction Allocation -
    17             $19,000)
    18             (Design and Contingencies - $2,000)
    19         (4)  Penn Township, T-839 over Pine Creek,
    20             Bridge Rehabilitation                          80,000
    21             (Base Construction Allocation -
    22             $60,000)
    23             (Design and Contingencies - $20,000)
    24         (5)  Port Matilda Borough, Pedestrian
    25             Bridge over Bald Eagle Creek, Bridge
    26             Rehabilitation                                200,000
    27             (Base Construction Allocation -
    28             $175,000)
    29             (Design and Contingencies - $25,000)
    30         (6)  Spring Township, T-367, Hill Road
    19990S0504B1471                 - 183 -

     1             Bridge, Bridge Replacement                    200,000
     2             (Base Construction Allocation -
     3             $150,000)
     4             (Land Allocation - $10,000)
     5             (Design and Contingencies - $40,000)
     6         (7)  Taylor Township, T-308, McMonagle Road
     7             over Sparrow Run, Bridge Replacement          330,000
     8             (Base Construction Allocation -
     9             $275,000)
    10             (Land Allocation - $5,000)
    11             (Design and Contingencies - $50,000)
    12         (8)  Rush Township, Six Mile Road Bridge
    13             over Six Mile Run, Bridge Replacement         155,000
    14             (Base Construction Allocation -
    15             $137,000)
    16             (Land Allocation - $5,000)
    17             (Design and Contingencies - $13,000)
    18         (9)  Taylor Township, T-300, Big Fill Run
    19             Bridge over Big Fill Run, Bridge
    20             Replacement                                   310,000
    21             (Base Construction Allocation -
    22             $200,000)
    23             (Land Allocation - $10,000)
    24             (Design and Contingencies - $100,000)
    25         (10)  Taylor Township, T-305, Bald Eagle
    26             Creek Bridge over Bald Eagle Creek,
    27             Bridge Replacement                            360,000
    28             (Base Construction Allocation -
    29             $250,000)
    30             (Land Allocation - $10,000)
    19990S0504B1471                 - 184 -

     1             (Design and Contingencies - $100,000)
     2         (11)  FERGUSON TOWNSHIP, T-307, WEST                       <--
     3             GATESBURG ROAD BRIDGE, BRIDGE
     4             REPLACEMENT                                   100,000
     5             (BASE CONSTRUCTION ALLOCATION -
     6             $89,000)
     7             (DESIGN AND CONTINGENCIES - $11,000)
     8         (12)  FERGUSON TOWNSHIP, T-703, SCOTT ROAD
     9             BRIDGE, BRIDGE REHABILITATION                  90,000
    10             (BASE CONSTRUCTION ALLOCATION -
    11             $75,000)
    12             (DESIGN AND CONTINGENCIES - $15,000)
    13     (b)  State Bridges
    14         (1)  SR 0080, I-80 Viaduct over Moshannon
    15             Creek and Conrail, Rush Township,
    16             Bridge Rehabilitation                      14,510,000
    17             (Base Construction Allocation -
    18             $13,210,000)
    19             (Design and Contingencies - $1,300,000)
    20         (2)  SR 1002, Marsh Creek Bridge over Marsh
    21             Creek, Boggs Township, Bridge
    22             Replacement                                   760,000
    23             (Base Construction Allocation -
    24             $630,000)
    25             (Land Allocation - $20,000)
    26             (Design and Contingencies - $110,000)
    27         (3)  SR 1002, Little Marsh Creek Bridge
    28             over Little Marsh Creek, Curtin
    29             Township, Bridge Replacement                  700,000
    30             (Base Construction Allocation -
    19990S0504B1471                 - 185 -

     1             $600,000)
     2             (Land Allocation - $20,000)
     3             (Design and Contingencies - $80,000)
     4         (4)  SR 2012, Penns Creek Bridge Northwest
     5             of the Village of Spring Mills, Gregg
     6             Township, Bridge Replacement                  470,000
     7             (Base Construction Allocation -
     8             $360,000)
     9             (Land Allocation - $20,000)
    10             (Design and Contingencies - $90,000)
    11         (5)  SR 0220, SR 0220 over Laurel Run, Port
    12             Matilda Borough, Bridge Rehabilitation        450,000
    13             (Base Construction Allocation -
    14             $400,000)
    15             (Design and Contingencies - $50,000)
    16         (6)  SR 0053, Moshannon Creek Bridge over
    17             Moshannon Creek, Philipsburg Borough,
    18             Bridge Replacement                          2,250,000
    19             (Base Construction Allocation -
    20             $2,000,000)
    21             (Land Allocation - $50,000)
    22             (Design and Contingencies - $200,000)
    23         (7)  SR 0144, Bald Eagle Creek Bridge over
    24             Bald Eagle Creek, Boggs Township,
    25             Bridge Replacement                          1,210,000
    26             (Base Construction Allocation -
    27             $950,000)
    28             (Land Allocation - $10,000)
    29             (Design and Contingencies - $250,000)
    30         (8)  SR 0879, Susquehanna Bridge over West
    19990S0504B1471                 - 186 -

     1             Branch of Susquehanna River, Burnside
     2             Township, Bridge Replacement                3,700,000
     3             (Base Construction Allocation -
     4             $3,200,000)
     5             (Land Allocation - $100,000)
     6             (Design and Contingencies - $400,000)
     7         (9)  SR 0970, Bridge over Moshannon Creek,
     8             Rush Township, Bridge Painting                310,000
     9             (Base Construction Allocation -
    10             $300,000)
    11             (Design and Contingencies - $10,000)
    12         (10)  SR 1005, Nittany Creek Bridge over
    13             Nittany Creek, Marion Township, Bridge
    14             Replacement                                   260,000
    15             (Base Construction Allocation -
    16             $150,000)
    17             (Land Allocation - $10,000)
    18             (Design and Contingencies - $100,000)
    19         (11)  SR 2007, Spruce Creek Bridge over
    20             Spruce Creek, Gregg Township, Bridge
    21             Replacement                                   260,000
    22             (Base Construction Allocation -
    23             $150,000)
    24             (Land Allocation - $10,000)
    25             (Design and Contingencies - $100,000)
    26         (12)  SR 2011, Penns Creek Bridge over
    27             Penns Creek, Penn Township, Bridge
    28             Replacement                                 1,040,000
    29             (Base Construction Allocation -
    30             $830,000)
    19990S0504B1471                 - 187 -

     1             (Land Allocation - $10,000)
     2             (Design and Contingencies - $200,000)
     3         (13)  SR 2012, Spring Bridge over Penns
     4             Creek, Gregg Township, Bridge
     5             Replacement                                   670,000
     6             (Base Construction Allocation -
     7             $500,000)
     8             (Land Allocation - $20,000)
     9             (Design and Contingencies - $150,000)
    10         (14)  SR 2018, Mill Race Bridge over Mill
    11             Race, Penn Township, Bridge Painting            8,000
    12             (Base Construction Allocation - $7,000)
    13             (Design and Contingencies - $1,000)
    14         (15)  SR 3027, Trout Run Bridge over Trout
    15             Run, Rush Township, Bridge Replacement        270,000
    16             (Base Construction Allocation -
    17             $160,000)
    18             (Land Allocation - $10,000)
    19             (Design and Contingencies - $100,000)
    20         (16)  SR 3034, Cold Stream Run Bridge over
    21             Cold Stream Run, Rush Township, Bridge
    22             Replacement                                   746,000
    23             (Base Construction Allocation -
    24             $576,000)
    25             (Land Allocation - $20,000)
    26             (Design and Contingencies - $150,000)
    27         (17)  SR 4004, Wallace Run Bridge over
    28             Wallace Run, Boggs Township, Bridge
    29             Replacement                                   455,000
    30             (Base Construction Allocation -
    19990S0504B1471                 - 188 -

     1             $345,000)
     2             (Land Allocation - $10,000)
     3             (Design and Contingencies - $100,000)
     4         (18)  SR 4005, Bridge over I-80, Snow Shoe
     5             Township, Bridge Replacement                2,400,000
     6             (Base Construction Allocation -
     7             $2,000,000)
     8             (Land Allocation - $100,000)
     9             (Design and Contingencies - $300,000)
    10         (19)  SR 4006, Moshannon Creek Bridge over
    11             Moshannon Creek, Rush Township, Bridge
    12             Replacement                                 1,000,000
    13             (Base Construction Allocation -
    14             $780,000)
    15             (Land Allocation - $20,000)
    16             (Design and Contingencies - $200,000)
    17         (20)  SR 0504, Black Moshannon Creek
    18             Bridge, Moshannon State Park, Rush
    19             Township, Bridge Rehabilitation                13,000
    20             (Base Construction Allocation -
    21             $11,000)
    22             (Design and Contingencies - $2,000)
    23         (21)  SR 0550, Bridge over Half Moon Creek,
    24             Half Moon Township, Bridge Replacement        230,000
    25             (Base Construction Allocation -
    26             $200,000)
    27             (Land Allocation - $10,000)
    28             (Design and Contingencies - $20,000)
    29         (22)  SR 0504, BLACK MOSHANNON CREEK BRIDGE                <--
    30             IN MOSHANNON STATE PARK, RUSH TOWNSHIP,
    19990S0504B1471                 - 189 -

     1             BRIDGE REPLACEMENT                            540,000
     2             (BASE CONSTRUCTION ALLOCATION -
     3             $410,000)
     4             (LAND ALLOCATION - $40,000)
     5             (DESIGN AND CONTINGENCIES - $90,000)
     6         (23)  SR 0026, BRIDGE OVERPASS, OVER NBER
     7             RAILROAD, SPRING TOWNSHIP, NEW BRIDGE
     8             CONSTRUCTION                                1,150,000
     9             (BASE CONSTRUCTION ALLOCATION -
    10             $1,000,000)
    11             (LAND ALLOCATION - $50,000)
    12             (DESIGN AND CONTINGENCIES - $100,000)
    13         (24)  SR 3026, BRIDGE ON T-965, TADPOLE
    14             ROAD, FERGUSON TOWNSHIP, BRIDGE
    15             REPLACEMENT                                   105,000
    16             (BASE CONSTRUCTION ALLOCATION -
    17             $90,000)
    18             (DESIGN AND CONTINGENCIES - $15,000)
    19         (25)  SR 3013, BRIDGE ON T-966, MARENGO
    20             ROAD, FERGUSON TOWNSHIP, BRIDGE
    21             REPLACEMENT                                   105,000
    22             (BASE CONSTRUCTION ALLOCATION -
    23             $90,000)
    24             (DESIGN AND CONTINGENCIES - $15,000)
    25  Section 19.  Chester County.
    26     (a)  Local Bridges
    27         (1)  Parkesburg Borough, State Street
    28             Pedestrian Bridge over Amtrak, Bridge
    29             Replacement                                 1,700,000
    30             (Base Construction Allocation -
    19990S0504B1471                 - 190 -

     1             $1,000,000)
     2             (Land Allocation - $500,000)
     3             (Design and Contingencies - $200,000)
     4         (2)  East Fallowfield Township, T-362,
     5             Timacuia Road under Penn Central
     6             Railroad, Bridge Removal                      445,000
     7             (Base Construction Allocation -
     8             $400,000)
     9             (Land Allocation - $30,000)
    10             (Design and Contingencies - $15,000)
    11         (3)  East Marlborough Township, T-402,
    12             County Bridge No.65, Mill Road Bridge
    13             over West Branch of Red Clay Creek,
    14             Bridge Replacement                            345,000
    15             (Base Construction Allocation -
    16             $291,000)
    17             (Land Allocation - $25,000)
    18             (Design and Contingencies - $29,000)
    19         (4)  Oxford Borough, Broad Street Bridge
    20             over SEPTA, Bridge Replacement              1,304,000
    21             (Base Construction Allocation -
    22             $1,125,000)
    23             (Land Allocation - $20,000)
    24             (Design and Contingencies - $159,000)
    25         (5)  Penn Township, County Bridge No.260,
    26             Posey Mill Road Bridge over Big Elk
    27             Creek, Bridge Replacement                     425,000
    28             (Base Construction Allocation -
    29             $300,000)
    30             (Land Allocation - $25,000)
    19990S0504B1471                 - 191 -

     1             (Design and Contingencies - $100,000)
     2         (6)  Tredyffrin Township, Old Lancaster
     3             Pike Bridge over Amtrak, Bridge
     4             Rehabilitation                                465,000
     5             (Base Construction Allocation -
     6             $400,000)
     7             (Land Allocation - $30,000)
     8             (Design and Contingencies - $35,000)
     9         (7)  Tredyffrin Township, T-807, Evans Road
    10             Bridge over Conrail, Bridge
    11             Replacement                                   195,000
    12             (Base Construction Allocation -
    13             $150,000)
    14             (Land Allocation - $30,000)
    15             (Design and Contingencies - $15,000)
    16         (8)  West Caln and West Brandywine
    17             Townships, County Bridge No.283, Reid
    18             Road Bridge over West Branch of
    19             Brandywine Creek, Bridge Replacement          790,000
    20             (Base Construction Allocation -
    21             $600,000)
    22             (Land Allocation - $40,000)
    23             (Design and Contingencies - $150,000)
    24         (9)  West Goshen Township, T-210, Old
    25             Eachus Mill Road Bridge over SEPTA,
    26             Bridge Replacement                            615,000
    27             (Base Construction Allocation -
    28             $500,000)
    29             (Land Allocation - $15,000)
    30             (Design and Contingencies - $100,000)
    19990S0504B1471                 - 192 -

     1         (10)  West Goshen Township, T-328, Bridge
     2             over Penn Central Railroad, Bridge
     3             Removal                                       132,000
     4             (Base Construction Allocation -
     5             $110,000)
     6             (Land Allocation - $5,000)
     7             (Design and Contingencies - $17,000)
     8         (11)  West Marlborough Township, T-368,
     9             Creek Road Bridge under Penn Central
    10             Railroad, Bridge Removal                      580,000
    11             (Base Construction Allocation -
    12             $500,000)
    13             (Land Allocation - $5,000)
    14             (Design and Contingencies - $75,000)
    15         (12)  West Marlborough Township, Bridge
    16             over Doe Run, Bridge Replacement              915,000
    17             (Base Construction Allocation -
    18             $750,000)
    19             (Land Allocation - $25,000)
    20             (Design and Contingencies - $140,000)
    21         (13)  East Coventry Township, Zeiber Road
    22             over Pigeon Creek, Bridge Replacement         375,000
    23             (Base Construction Allocation -
    24             $300,000)
    25             (Land Allocation - $15,000)
    26             (Design and Contingencies - $60,000)
    27         (14)  South Coventry Township, Young Road
    28             over Pigeon Creek, Bridge
    29             Rehabilitation                                  6,000
    30             (Base Construction Allocation - $6,000)
    19990S0504B1471                 - 193 -

     1         (15)  Franklin Township, T-356, Mount
     2             Olivet Road Bridge over Unnamed
     3             Tributary of Big Elk Creek, Bridge
     4             Rehabilitation                                  9,000
     5             (Base Construction Allocation - $7,000)
     6             (Design and Contingencies - $2,000)
     7         (16)  North Coventry Township, South Keim
     8             Street, Bridge No.270 over Small Run,
     9             Bridge Replacement                            690,000
    10             (Base Construction Allocation -
    11             $500,000)
    12             (Land Allocation - $40,000)
    13             (Design and Contingencies - $150,000)
    14         (17)  Atglen Borough, Old Newport Pike
    15             Bridge over Officer's Run Creek, Bridge
    16             Rehabilitation                              1,500,000
    17         (18)  New London Township, T-321, Bridge
    18             over West Branch of White Clay Creek,
    19             Bridge Rehabilitation                          25,000
    20             (Base Construction Allocation -
    21             $20,000)
    22             (Design and Contingencies - $5,000)
    23         (19)  West Chester Borough, Neild Street
    24             Bridge over Goose Creek, Bridge
    25             Replacement                                   111,000
    26             (Base Construction Allocation -
    27             $103,000)
    28             (Design and Contingencies - $8,000)
    29         (20)  West Chester Borough, Lacey Street
    30             Bridge over Goose Creek, Bridge
    19990S0504B1471                 - 194 -

     1             Rehabilitation                                111,000
     2             (Base Construction Allocation -
     3             $103,000)
     4             (Design and Contingencies - $8,000)
     5         (21)  West Nottingham Township, T-307 and
     6             T-311, Bridge over Roney's Run and
     7             Northeast, Bridge Rehabilitation              135,000
     8             (Base Construction Allocation -
     9             $125,000)
    10             (Design and Contingencies - $10,000)
    11         (22)  West Whiteland Township, Whiteford
    12             Road at Clover Mill, Drainage
    13             Improvement, Bridge Rehabilitation            125,000
    14             (Base Construction Allocation -
    15             $100,000)
    16             (Land Allocation - $10,000)
    17             (Design and Contingencies - $15,000)
    18         (23)  West Nottingham Township, TR 307 and
    19             TR 311, Bridge over Roney's Run and
    20             North East Creek, Bridge
    21             Rehabilitation                                135,000
    22             (Base Construction Allocation -
    23             $125,000)
    24             (Design and Contingencies - $10,000)
    25         (24)  West Chester Borough, Lacey Street
    26             Bridge over Goose Creek, Bridge
    27             Replacement                                   111,000
    28             (Base Construction Allocation -
    29             $103,000)
    30             (Design and Contingencies - $8,000)
    19990S0504B1471                 - 195 -

     1         (25)  Atglen Borough, Old Newport Pike
     2             Bridge over Officer's Run Creek, Bridge
     3             Rehabilitation                              1,500,000
     4             (Base Construction Allocation -
     5             $1,500,000)
     6         (26)  Penn Township, A150 and SR 0796,
     7             Bridge over SEPTA (Delaware Valley
     8             Branch), Bridge Rehabilitation                385,000
     9             (Base Construction Allocation -
    10             $350,000)
    11             (Design and Contingencies - $35,000)
    12         (27)  Penn Township, T-356, Bridge over
    13             Middle Creek, Bridge Rehabilitation           165,000
    14             (Base Construction Allocation -
    15             $150,000)
    16             (Design and Contingencies - $15,000)
    17         (28)  Uwchlan Township, PA 113, Bridge over
    18             Pennsylvania Turnpike, Bridge
    19             Replacement                                 6,500,000
    20             (Base Construction Allocation -
    21             $5,500,000)
    22             (Land Allocation - $500,000)
    23             (Design and Contingencies - $500,000)
    24         (29)  Avondale Borough, PA 41, Bridge over
    25             White Clay Creek, Bridge
    26             Rehabilitation                                220,000
    27             (Base Construction Allocation -
    28             $200,000)
    29             (Design and Contingencies - $20,000)
    30         (30)  Atglen Borough, PA 41, Bridge over
    19990S0504B1471                 - 196 -

     1             Valley Creek, Bridge Replacement            1,000,000
     2             (Base Construction Allocation -
     3             $800,000)
     4             (Land Allocation - $100,000)
     5             (Design and Contingencies - $100,000)
     6         (31)  East Nantmeal and Warwick Townships,
     7             James Mill Road over French Creek             525,000
     8             (Base Construction Allocation -
     9             $400,000)
    10             (Land Allocation - $25,000)
    11             (Design and Contingencies - $100,000)
    12         (32)  Atglen Township, Old Newport Pike
    13             Bridge over Valley Creek, Bridge
    14             Replacement                                   450,000
    15             (Base Construction Allocation -
    16             $400,000)
    17             (Land Allocation - $10,000)
    18             (Design and Contingencies - $40,000)
    19         (33)  East Pikeland Township, Pickering
    20             Road Bridge over Pickering Creek,
    21             Bridge Replacement                            795,000
    22             (Base Construction Allocation -
    23             $700,000)
    24             (Land Allocation - $20,000)
    25             (Design and Contingencies - $75,000)
    26         (34)  East and West Bradford Townships,
    27             Harmony Hill Road Bridge over East
    28             Branch Brandywine Creek, Bridge
    29             Rehabilitation                              1,250,000
    30             (Base Construction Allocation -
    19990S0504B1471                 - 197 -

     1             $1,000,000)
     2             (Land Allocation - $75,000)
     3             (Design and Contingencies - $175,000)
     4         (35)  Highland and Londonderry Townships,
     5             T-310 and T-344, Bridge over Doe Run,
     6             Bridge Replacement                            920,000
     7             (Base Construction Allocation -
     8             $700,000)
     9             (Land Allocation - $40,000)
    10             (Design and Contingencies - $180,000)
    11         (36)  Lower Oxford Township, Fairview Road
    12             Bridge over Tweeds Run, Bridge
    13             Replacement                                   920,000
    14             (Base Construction Allocation -
    15             $700,000)
    16             (Land Allocation - $60,000)
    17             (Design and Contingencies - $160,000)
    18         (37)  Avondale Borough, State Street Bridge
    19             over Indian Run, Bridge Replacement           560,000
    20             (Base Construction Allocation -
    21             $500,000)
    22             (Land Allocation - $10,000)
    23             (Design and Contingencies - $50,000)
    24         (38)  EAST GOSHEN TOWNSHIP, DUTTON MILL                    <--
    25             ROAD BRIDGE OVER RIDLEY CREEK, BRIDGE
    26             REPLACEMENT                                 1,040,000
    27     (b)  State Bridges
    28         (1)  SR 1010, Swedesford Road Bridge over
    29             US 422, Drummers Lane and Warner Road,
    30             Tredyffrin, Chester County, Upper
    19990S0504B1471                 - 198 -

     1             Merion, Montgomery County, Bridge
     2             Replacement                                 6,795,000
     3             (Base Construction Allocation -
     4             $6,210,000)
     5             (Land Allocation - $180,000)
     6             (Design and Contingencies - $405,000)
     7         (2)  SR 1045, Hares Hill Road Bridge over
     8             French Creek, East Pikeland Township,
     9             Bridge Rehabilitation                       1,000,000
    10             (Base Construction Allocation -
    11             $740,000)
    12             (Land Allocation - $60,000)
    13             (Design and Contingencies - $200,000)
    14         (3)  SR 3014, Lees Road Bridge over Black
    15             Run, West Nottingham Township, Bridge
    16             Replacement                                 1,125,000
    17             (Base Construction Allocation -
    18             $850,000)
    19             (Land Allocation - $75,000)
    20             (Design and Contingencies - $200,000)
    21         (4)  SR 3030, Street Road Bridge over
    22             Octoraro Creek, Upper Oxford Township,
    23             Bridge Replacement                          1,875,000
    24             (Base Construction Allocation -
    25             $1,600,000)
    26             (Land Allocation - $75,000)
    27             (Design and Contingencies - $200,000)
    28         (5)  SR 0003, Gay Street Bridge over
    29             Abandoned Conrail, West Chester
    30             Borough, Bridge Removal                       180,000
    19990S0504B1471                 - 199 -

     1             (Base Construction Allocation -
     2             $150,000)
     3             (Land Allocation - $10,000)
     4             (Design and Contingencies - $20,000)
     5         (6)  SR 0842, Shaws Bridges (Two Bridges)
     6             over Branch of Brandywine Creek, East
     7             Bradford and Pocopson Townships, Bridge
     8             Replacement                                 1,500,000
     9             (Base Construction Allocation -
    10             $1,288,000)
    11             (Land Allocation - $100,000)
    12             (Design and Contingencies - $112,000)
    13         (7)  SR 0842, Bridge Road Bridge over East
    14             Branch of Brandywine Creek, East
    15             Bradford Township, Bridge Painting            214,000
    16             (Base Construction Allocation -
    17             $186,000)
    18             (Design and Contingencies - $28,000)
    19         (8)  SR 1049, Rapp's Dam Covered Bridge,
    20             East Pikeland Township, Bridge
    21             Painting                                       47,000
    22             (Base Construction Allocation -
    23             $41,000)
    24             (Design and Contingencies - $6,000)
    25         (9)  SR 2011, Phoenixville Pike Bridge
    26             under Abandoned Penn Central Railroad,
    27             West Goshen Township, Bridge Removal          125,000
    28             (Base Construction Allocation -
    29             $100,000)
    30             (Land Allocation - $10,000)
    19990S0504B1471                 - 200 -

     1             (Design and Contingencies - $15,000)
     2         (10)  SR 2018, Green Hill Road Bridge under
     3             Abandoned Penn Central Railroad, West
     4             Goshen Township, Bridge Removal               125,000
     5             (Base Construction Allocation -
     6             $100,000)
     7             (Land Allocation - $10,000)
     8             (Design and Contingencies - $15,000)
     9         (11)  SR 3045, Springdell Road Bridge under
    10             Abandoned Penn Central Railroad, West
    11             Marborough Township, Bridge Removal           125,000
    12             (Base Construction Allocation -
    13             $100,000)
    14             (Land Allocation - $10,000)
    15             (Design and Contingencies - $15,000)
    16         (12)  SR 3049, Hilltop View Road Bridge
    17             over Buck and Doe Run Creek, Newlin
    18             Township, Bridge Replacement                1,450,000
    19             (Base Construction Allocation -
    20             $1,300,000)
    21             (Land Allocation - $50,000)
    22             (Design and Contingencies - $100,000)
    23         (13)  SR 1012, Bridge over Trout Creek,
    24             Tredyffrin Township, Bridge
    25             Replacement                                   850,000
    26             (Base Construction Allocation -
    27             $550,000)
    28             (Land Allocation - $50,000)
    29             (Design and Contingencies - $250,000)
    30         (14)  SR 0113, Gay Street Bridge over
    19990S0504B1471                 - 201 -

     1             French Creek, Phoenixville Borough,
     2             Bridge Replacement                         10,200,000
     3             (Base Construction Allocation -
     4             $9,000,000)
     5             (Land Allocation - $200,000)
     6             (Design and Contingencies - $1,000,000)
     7         (15)  SR 202, BRIDGE DECKS AT SECTION 200,                 <--
     8             BRIDGE DECK REHABILITATION                  1,300,000
     9         (16)  WESTTOWN ROAD, FALLS BRIDGE OVER
    10             CHESTER CREEK, WESTTOWN TOWNSHIP,
    11             BRIDGE REHABILITATION                         610,000
    12         (17)  WHITFORD ROAD BRIDGE UNDER AMTRAK,
    13             WEST WHITELAND TOWNSHIP, BRIDGE
    14             REPLACEMENT                                 3,000,000
    15         (18)  GROVE ROAD BRIDGE OVER BROAD RUN,
    16             WEST WHITELAND TOWNSHIP, BRIDGE
    17             REPLACEMENT                                 1,097,000
    18  Section 20.  Clarion County.
    19     (a)  Local Bridges
    20         (1)  Beaver Township, T-400, Canoe Creek
    21             Bridge over Canoe Creek, Bridge
    22             Replacement                                   380,000
    23             (Base Construction Allocation -
    24             $300,000)
    25             (Land Allocation - $10,000)
    26             (Design and Contingencies - $70,000)
    27         (2)  Beaver Township, T-422, Deer Creek
    28             Bridge over Deer Creek, Bridge
    29             Replacement                                   540,000
    30             (Base Construction Allocation -
    19990S0504B1471                 - 202 -

     1             $450,000)
     2             (Land Allocation - $30,000)
     3             (Design and Contingencies - $60,000)
     4         (3)  Clarion and Millcreek Townships, T-
     5             490, Mill Creek Bridge over Mill Creek,
     6             Bridge Replacement                            540,000
     7             (Base Construction Allocation -
     8             $450,000)
     9             (Land Allocation - $10,000)
    10             (Design and Contingencies - $80,000)
    11         (4)  Elk Township, T-424, Deer Creek Bridge
    12             over Deer Creek, Bridge Replacement           620,000
    13             (Base Construction Allocation -
    14             $500,000)
    15             (Land Allocation - $20,000)
    16             (Design and Contingencies - $100,000)
    17         (5)  Farmington Township, T-562, Walley Run
    18             Bridge over Walley Run, Bridge
    19             Replacement                                   375,000
    20             (Base Construction Allocation -
    21             $300,000)
    22             (Land Allocation - $5,000)
    23             (Design and Contingencies - $70,000)
    24         (6)  Knox Township, T-850, Toby Creek
    25             Bridge over Toby Creek, Bridge
    26             Replacement                                   480,000
    27             (Base Construction Allocation -
    28             $400,000)
    29             (Land Allocation - $20,000)
    30             (Design and Contingencies - $60,000)
    19990S0504B1471                 - 203 -

     1         (7)  Knox Township, T-600, Licking Creek
     2             Bridge over Licking Creek, Bridge
     3             Replacement                                   445,000
     4             (Base Construction Allocation -
     5             $350,000)
     6             (Land Allocation - $15,000)
     7             (Design and Contingencies - $80,000)
     8         (8)  Madison Township, T-460, Red Bank
     9             Creek Bridge over Tributary of Red Bank
    10             Creek, Bridge Replacement                     390,000
    11             (Base Construction Allocation -
    12             $300,000)
    13             (Land Allocation - $20,000)
    14             (Design and Contingencies - $70,000)
    15         (9)  Porter Township, T-462, Fiddlers Run
    16             Bridge over Fiddlers Run, Bridge
    17             Replacement                                   390,000
    18             (Base Construction Allocation -
    19             $300,000)
    20             (Land Allocation - $10,000)
    21             (Design and Contingencies - $80,000)
    22         (10)  Porter Township, T-472, Leatherwood
    23             Creek Bridge over Leatherwood Creek,
    24             Bridge Replacement                            455,000
    25             (Base Construction Allocation -
    26             $375,000)
    27             (Land Allocation - $20,000)
    28             (Design and Contingencies - $60,000)
    29         (11)  Porter Township, T-750, Leisure Run
    30             Bridge over Leisure Run, Bridge
    19990S0504B1471                 - 204 -

     1             Replacement                                   390,000
     2             (Base Construction Allocation -
     3             $300,000)
     4             (Land Allocation - $10,000)
     5             (Design and Contingencies - $80,000)
     6         (12)  Red Bank Township, T-840, Beaver
     7             Creek Bridge over Beaver Creek, Bridge
     8             Replacement                                   420,000
     9             (Base Construction Allocation -
    10             $350,000)
    11             (Land Allocation - $15,000)
    12             (Design and Contingencies - $55,000)
    13         (13)  Red Bank Township, T-508, County
    14             Bridge No.46, Pine Creek Bridge over
    15             Pine Creek, Bridge Replacement                378,000
    16             (Base Construction Allocation -
    17             $300,000)
    18             (Land Allocation - $8,000)
    19             (Design and Contingencies - $70,000)
    20         (14)  Richland Township, T-382, Turkey Run
    21             Bridge over Turkey Run, Bridge
    22             Replacement                                   360,000
    23             (Base Construction Allocation -
    24             $300,000)
    25             (Land Allocation - $10,000)
    26             (Design and Contingencies - $50,000)
    27         (15)  Richland Township, T-382, Turkey Run
    28             Bridge over Turkey Run, Bridge
    29             Replacement                                   360,000
    30             (Base Construction Allocation -
    19990S0504B1471                 - 205 -

     1             $300,000)
     2             (Land Allocation - $10,000)
     3             (Design and Contingencies - $50,000)
     4         (16)  Sligo Borough, Madison Street Bridge
     5             over Little Licking Creek, Bridge
     6             Replacement                                   445,000
     7             (Base Construction Allocation -
     8             $350,000)
     9             (Land Allocation - $15,000)
    10             (Design and Contingencies - $80,000)
    11         (17)  Beaver Township, T-332, Bridge No.17
    12             over Beaver Creek, Bridge Replacement         560,000
    13             (Base Construction Allocation -
    14             $400,000)
    15             (Land Allocation - $10,000)
    16             (Design and Contingencies - $150,000)
    17         (18)  Beaver Township, T-385 over Canoe
    18             Creek, Bridge Replacement                     490,000
    19             (Base Construction Allocation -
    20             $320,000)
    21             (Land Allocation - $80,000)
    22             (Design and Contingencies - $90,000)
    23         (19)  Highland Township, T-573 over Toby
    24             Creek, Bridge Replacement                     500,000  <--
    25             (Base Construction Allocation -
    26             $360,000)
    27             (Land Allocation - $40,000)
    28             (Design and Contingencies - $100,000)
    29             CREEK, BRIDGE REPLACEMENT                     920,000  <--
    30             (BASE CONSTRUCTION ALLOCATION -
    19990S0504B1471                 - 206 -

     1             $700,000)
     2             (LAND ALLOCATION - $40,000)
     3             (DESIGN AND CONTINGENCIES - $180,000)
     4         (20)  Knox Township, T-850 over Step Creek,
     5             Bridge Replacement                            240,000
     6             (Base Construction Allocation -
     7             $180,000)
     8             (Land Allocation - $20,000)
     9             (Design and Contingencies - $40,000)
    10         (21)  Perry Township, T-301, Bridge
    11             Replacement                                   200,000
    12             (Base Construction Allocation -
    13             $130,000)
    14             (Land Allocation - $30,000)
    15             (Design and Contingencies - $40,000)
    16         (22)  Millcreek Township, T-564 over Little
    17             Mill Creek, Bridge Replacement                480,000
    18             (Base Construction Allocation -
    19             $400,000)
    20             (Land Allocation - $20,000)
    21             (Design and Contingencies - $60,000)
    22         (23)  Paint Township, T-578 over Step
    23             Creek, Bridge Replacement                     500,000
    24             (Base Construction Allocation -
    25             $400,000)
    26             (Land Allocation - $20,000)
    27             (Design and Contingencies - $80,000)
    28         (24)  Monroe Township, T-486, County Bridge
    29             No.22 over Piney Creek, Bridge
    30             Replacement                                   480,000
    19990S0504B1471                 - 207 -

     1             (Base Construction Allocation -
     2             $400,000)
     3             (Land Allocation - $10,000)
     4             (Design and Contingencies - $70,000)
     5         (25)  Clarion Township, T-532 over Brush
     6             Run, Bridge Replacement                       245,000
     7             (Base Construction Allocation -
     8             $200,000)
     9             (Land Allocation - $10,000)
    10             (Design and Contingencies - $35,000)
    11         (26)  Clarion Township, T-561 over Jones
    12             Run, Bridge Replacement                       245,000
    13             (Base Construction Allocation -
    14             $200,000)
    15             (Land Allocation - $10,000)
    16             (Design and Contingencies - $35,000)
    17         (27)  Elk Township, T-582 over Mahles Run,
    18             Bridge Replacement                            245,000
    19             (Base Construction Allocation -
    20             $200,000)
    21             (Land Allocation - $10,000)
    22             (Design and Contingencies - $35,000)
    23         (28)  Farmington Township, T-609 over Engle
    24             Run, Bridge Replacement                       245,000
    25             (Base Construction Allocation -
    26             $200,000)
    27             (Land Allocation - $10,000)
    28             (Design and Contingencies - $35,000)
    29         (29)  Paint Township, T-577 over Toby
    30             Creek, Bridge Replacement                     106,000
    19990S0504B1471                 - 208 -

     1             (Base Construction Allocation -
     2             $100,000)
     3             (Land Allocation - $1,000)
     4             (Design and Contingencies - $5,000)
     5         (30)  Paint Township, T-576 over Toby
     6             Creek, Bridge Replacement                     106,000
     7             (Base Construction Allocation -
     8             $100,000)
     9             (Land Allocation - $1,000)
    10             (Design and Contingencies - $5,000)
    11         (31)  Beaver Township, T-405 over Canoe
    12             Creek, Bridge Replacement                     106,000
    13             (Base Construction Allocation -
    14             $100,000)
    15             (Land Allocation - $1,000)
    16             (Design and Contingencies - $5,000)
    17         (32)  Beaver Township, T-411 over Boyd Run,
    18             Bridge Replacement                            106,000
    19             (Base Construction Allocation -
    20             $100,000)
    21             (Land Allocation - $1,000)
    22             (Design and Contingencies - $5,000)
    23         (33)  Elk Township, T-424 over Deer Creek,
    24             Bridge Replacement                            250,000
    25             (Base Construction Allocation -
    26             $200,000)
    27             (Land Allocation - $10,000)
    28             (Design and Contingencies - $40,000)
    29         (34)  Highland Township, T-577, Bridge over
    30             Toby Creek, Bridge Replacement                518,000
    19990S0504B1471                 - 209 -

     1             (Base Construction Allocation -
     2             $380,000)
     3             (Land Allocation - $8,000)
     4             (Design and Contingencies - $130,000)
     5         (35)  Beaver Township, T-423, Bridge over
     6             Canoe Creek, Bridge Replacement               510,000
     7             (Base Construction Allocation -
     8             $400,000)
     9             (Land Allocation - $10,000)
    10             (Design and Contingencies - $100,000)
    11         (36)  Elk Township, T-418, Bridge over Deer
    12             Creek, Bridge Replacement                     380,000
    13             (Base Construction Allocation -
    14             $300,000)
    15             (Land Allocation - $10,000)
    16             (Design and Contingencies - $70,000)
    17         (37)  Paint Township, T-582, Bridge over
    18             Little Paint Creek, Bridge Replacement        424,000
    19             (Base Construction Allocation -
    20             $350,000)
    21             (Land Allocation - $9,000)
    22             (Design and Contingencies - $65,000)
    23         (38)  Ashland Township, T-863, Bridge over
    24             Little Canoe Creek, Bridge Replacement        330,000
    25             (Base Construction Allocation -
    26             $200,000)
    27             (Land Allocation - $10,000)
    28             (Design and Contingencies - $120,000)
    29         (39)  Beaver Township, T-325, Schettler
    30             Road Bridge over Canoe Creek, Bridge
    19990S0504B1471                 - 210 -

     1             Replacement                                   395,000
     2             (Base Construction Allocation -
     3             $250,000)
     4             (Land Allocation - $15,000)
     5             (Design and Contingencies - $130,000)
     6         (40)  Madison Township, T-442, Bridge No.34
     7             over Wildcat Run, Bridge Replacement          425,000
     8             (Base Construction Allocation -
     9             $275,000)
    10             (Land Allocation - $10,000)
    11             (Design and Contingencies - $140,000)
    12         (41)  Madison Township, T-689, Bridge No.33
    13             over Wildcat Run, Bridge Replacement          460,000
    14             (Base Construction Allocation -
    15             $300,000)
    16             (Land Allocation - $10,000)
    17             (Design and Contingencies - $150,000)
    18         (42)  Madison Township, T-880, Bridge
    19             No.2050 over Turkey Run, Bridge
    20             Replacement                                   330,000
    21             (Base Construction Allocation -
    22             $200,000)
    23             (Land Allocation - $10,000)
    24             (Design and Contingencies - $120,000)
    25         (43)  Limestone Township, T-540, Little
    26             Piney Creek Bridge over Little Piney
    27             Creek, Bridge Replacement                     145,000
    28             (Base Construction Allocation -
    29             $112,000)
    30             (Land Allocation - $8,000)
    19990S0504B1471                 - 211 -

     1             (Design and Contingencies - $25,000)
     2         (44)  Clarion Township, T-561, Bridge
     3             Washout over Jones Run, Bridge
     4             Replacement                                   245,000
     5             (Base Construction Allocation -
     6             $200,000)
     7             (Land Allocation - $10,000)
     8             (Design and Contingencies - $35,000)
     9         (45)  Elk Township, T-424, Deer Creek
    10             Bridge over Deer Creek, Bridge
    11             Replacement                                   620,000
    12             (Base Construction Allocation -
    13             $500,000)
    14             (Land Allocation - $20,000)
    15             (Design and Contingencies - $100,000)
    16         (46)  Elk Township, T-424, Culvert over
    17             Deer Creek, Bridge Replacement                250,000
    18             (Base Construction Allocation -
    19             $200,000)
    20             (Land Allocation - $10,000)
    21             (Design and Contingencies - $40,000)
    22         (47)  Millcreek Township, T-564, Little
    23             Mill Creek Bridge over Little Mill
    24             Creek, Bridge Replacement                     480,000
    25             (Base Construction Allocation -
    26             $400,000)
    27             (Land Allocation - $20,000)
    28             (Design and Contingencies - $60,000)
    29         (48)  Paint Township, T-578, Step Creek
    30             Bridge over Step Creek, Bridge
    19990S0504B1471                 - 212 -

     1             Replacement                                   360,000
     2             (Base Construction Allocation -
     3             $300,000)
     4             (Land Allocation - $10,000)
     5             (Design & Contingencies - $50,000)
     6         (49)  Paint Township, T-578, Steiner Road
     7             Bridge over Step Creek, Bridge
     8             Replacement                                   500,000
     9             (Base Construction Allocation -
    10             $400,000)
    11             (Land Allocation - $20,000)
    12             (Design and Contingencies - $80,000)
    13         (50)  Beaver Township, T-385, Bridge over
    14             Canoe Creek, Bridge Replacement             1,100,000
    15             (Base Construction Allocation -
    16             $880,000)
    17             (Land Allocation - $20,000)
    18             (Design and Contingencies - $200,000)
    19         (51)  Beaver Township, T-391, Bridge over
    20             Beaver Creek, Bridge Replacement              740,000
    21             (Base Construction Allocation -
    22             $550,000)
    23             (Land Allocation - $10,000)
    24             (Design and Contingencies - $180,000)
    25         (52)  Limestone Township, T-682, Bridge
    26             over Piney Creek, Bridge Replacement          490,000
    27             (Base Construction Allocation -
    28             $350,000)
    29             (Land Allocation - $10,000)
    30             (Design and Contingencies - $130,000)
    19990S0504B1471                 - 213 -

     1         (53)  Limestone Township, T-439, Bridge
     2             over Piney Creek, Bridge Replacement          872,000
     3             (Base Construction Allocation -
     4             $632,000)
     5             (Land Allocation - $10,000)
     6             (Design and Contingencies - $230,000)
     7         (54)  Monroe Township, T-486, Bridge over
     8             Pine Creek, Bridge Replacement                740,000
     9             (Base Construction Allocation -
    10             $550,000)
    11             (Land Allocation - $10,000)
    12             (Design and Contingencies - $180,000)
    13         (55)  Red Bank Township, T-513, Bridge over
    14             Piney Creek, Bridge Replacement               378,000
    15             (Base Construction Allocation -
    16             $300,000)
    17             (Land Allocation - $8,000)
    18             (Design and Contingencies - $70,000)
    19         (56)  Richland Township, T-382, Bridge over
    20             Turkey Run, Bridge Replacement                705,000
    21             (Base Construction Allocation -
    22             $495,000)
    23             (Land Allocation - $10,000)
    24             (Design and Contingencies - $200,000)
    25         (57)  Toby and Perry Townships, T-301,
    26             Bridge over Black Fiddlers Run, Bridge
    27             Replacement                                   325,000
    28             (Base Construction Allocation -
    29             $200,000)
    30             (Land Allocation - $10,000)
    19990S0504B1471                 - 214 -

     1             (Design and Contingencies - $115,000)
     2         (58)  Mill Creek Township, T-490 over Mill
     3             Creek, Drainage Improvement                   660,000
     4             (Base Construction Allocation -
     5             $550,000)
     6             (Land Allocation - $10,000)
     7             (Design and Contingencies - $100,000)
     8         (59)  BEAVER TOWNSHIP, T-332, COUNTY BRIDGE                <--
     9             NO.16 OVER BEAVER CREEK, BRIDGE
    10             REPLACEMENT                                   560,000
    11             (BASE CONSTRUCTION ALLOCATION -
    12             $400,000)
    13             (LAND ALLOCATION - $10,000)
    14             (DESIGN AND CONTINGENCIES - $150,000)
    15     (b)  State Bridges
    16         (1)  SR 0058, Callensburg Bridge over
    17             Clarion River, Licking Township, Bridge
    18             Painting                                      365,000
    19             (Base Construction Allocation -
    20             $350,000)
    21             (Design and Contingencies - $15,000)
    22         (2)  SR 0080, Beaver Creek Eastbound Bridge
    23             over Beaver Creek, Beaver Township,
    24             Bridge Painting                               390,000
    25             (Base Construction Allocation -
    26             $375,000)
    27             (Design and Contingencies - $15,000)
    28         (3)  SR 0080, Beaver Creek Westbound Bridge
    29             over Beaver Creek, Beaver Township,
    30             Bridge Painting                               390,000
    19990S0504B1471                 - 215 -

     1             (Base Construction Allocation -
     2             $375,000)
     3             (Design and Contingencies - $15,000)
     4         (4)  SR 0080, Canoe Creek Eastbound Bridge
     5             over Canoe Creek, Beaver Township,
     6             Bridge Painting                             1,230,000
     7             (Base Construction Allocation -
     8             $1,200,000)
     9             (Design and Contingencies - $30,000)
    10         (5)  SR 0080, Canoe Creek Westbound Bridge
    11             over Canoe Creek, Beaver Township,
    12             Bridge Painting                             1,290,000
    13             (Base Construction Allocation -
    14             $1,260,000)
    15             (Design and Contingencies - $30,000)
    16         (6)  SR 0080, TR 558 Bridge over I-80,
    17             Clarion Township, Bridge Painting             195,000
    18             (Base Construction Allocation -
    19             $180,000)
    20             (Design and Contingencies - $15,000)
    21         (7)  SR 0322, Exit 11 Bridge over I-80,
    22             Clarion Township, Clarion Bridge
    23             Painting                                      205,000
    24             (Base Construction Allocation -
    25             $190,000)
    26             (Design and Contingencies - $15,000)
    27         (8)  SR 0536, Mayport Bridge over Redbank
    28             Creek, Red Bank Township, Bridge
    29             Painting                                      215,000
    30             (Base Construction Allocation -
    19990S0504B1471                 - 216 -

     1             $200,000)
     2             (Design and Contingencies - $15,000)
     3         (9)  SR 1009, Brush Creek Bridge over Brush
     4             Creek, Clarion Township, Bridge
     5             Painting                                       70,000
     6             (Base Construction Allocation -
     7             $55,000)
     8             (Design and Contingencies - $15,000)
     9         (10)  SR 2001, Piney Creek Bridge over
    10             Piney Creek, Limestone Township, Bridge
    11             Painting                                       85,000
    12             (Base Construction Allocation -
    13             $70,000)
    14             (Design and Contingencies - $15,000)
    15         (11)  SR 2001, Little Piney Creek Bridge
    16             over Little Piney Creek, Limestone
    17             Township, Bridge Painting                      70,000
    18             (Base Construction Allocation -
    19             $55,000)
    20             (Design and Contingencies - $15,000)
    21         (12)  SR 2005, Glade Run Bridge over Glade
    22             Run, Limestone Township, Bridge
    23             Painting                                       60,000
    24             (Base Construction Allocation -
    25             $45,000)
    26             (Design and Contingencies - $15,000)
    27         (13)  SR 2007, Licking Creek Bridge over
    28             Licking Creek, Monroe Township, Bridge
    29             Painting                                       75,000
    30             (Base Construction Allocation -
    19990S0504B1471                 - 217 -

     1             $60,000)
     2             (Design and Contingencies - $15,000)
     3         (14)  SR 2009, Lawsonham Bridge over
     4             Redbank Creek, Madison Township, Bridge
     5             Painting                                      195,000
     6             (Base Construction Allocation -
     7             $180,000)
     8             (Design and Contingencies - $15,000)
     9         (15)  SR 2009, Wildcat Run Bridge over
    10             Wildcat Run, Madison Township, Bridge
    11             Painting                                       85,000
    12             (Base Construction Allocation -
    13             $70,000)
    14             (Design and Contingencies - $15,000)
    15         (16)  SR 2015, Little Piney Creek Bridge
    16             over Little Piney Creek, Limestone
    17             Township, Bridge Painting                      60,000
    18             (Base Construction Allocation -
    19             $45,000)
    20             (Design and Contingencies - $15,000)
    21         (17)  SR 3020, Alum Rock Bridge over Turkey
    22             Run, Richland Township, Bridge
    23             Painting                                       75,000
    24             (Base Construction Allocation -
    25             $60,000)
    26             (Design and Contingencies - $15,000)
    27         (18)  SR 4003, Turkey Run Bridge over
    28             Turkey Run, Richland Township, Bridge
    29             Painting                                       65,000
    30             (Base Construction Allocation -
    19990S0504B1471                 - 218 -

     1             $50,000)
     2             (Design and Contingencies - $15,000)
     3         (19)  SR 4005, Canoe Creek Bridge over
     4             Canoe Creek, Beaver Township, Bridge
     5             Painting                                       70,000
     6             (Base Construction Allocation -
     7             $55,000)
     8             (Design and Contingencies - $15,000)
     9         (20)  SR 0208, Conrail Overpass, Elk
    10             Township, Bridge Removal                      120,000
    11             (Base Construction Allocation -
    12             $80,000)
    13             (Land Allocation - $10,000)
    14             (Design and Contingencies - $30,000)
    15         (21)  SR 0322, Conrail Overpass, Elk
    16             Township, Bridge Removal                      250,000
    17             (Base Construction Allocation -
    18             $200,000)
    19             (Land Allocation - $10,000)
    20             (Design and Contingencies - $40,000)
    21         (22)  SR 1011, Lake Erie, Franklin and
    22             Clarion Railroad Overpass, Clarion
    23             Township, Bridge Removal                       12,000
    24             (Base Construction Allocation -
    25             $10,000)
    26             (Design and Contingencies - $2,000)
    27         (23)  SR 0066, Bridge over Piney Creek,
    28             Limestone Township, Bridge Replacement        650,000
    29             (Base Construction Allocation -
    30             $500,000)
    19990S0504B1471                 - 219 -

     1             (Land Allocation - $20,000)
     2             (Design and Contingencies - $130,000)
     3         (24)  SR 0066, Bridge over Little Piney
     4             Creek, Limestone Township, Bridge
     5             Replacement                                   600,000
     6             (Base Construction Allocation -
     7             $450,000)
     8             (Land Allocation - $20,000)
     9             (Design and Contingencies - $130,000)
    10         (25)  SR 0068, Bridge over Brush Run,
    11             Monroe Township, Bridge Replacement           650,000
    12             (Base Construction Allocation -
    13             $500,000)
    14             (Land Allocation - $20,000)
    15             (Design and Contingencies - $130,000)
    16         (26)  SR 0208, Bridge over Canoe Creek,
    17             Beaver Township, Bridge Replacement           550,000
    18             (Base Construction Allocation -
    19             $400,000)
    20             (Land Allocation - $20,000)
    21             (Design and Contingencies - $130,000)
    22         (27)  SR 2001, Bridge over Little Piney
    23             Creek, Limestone Township, Bridge
    24             Replacement                                   490,000
    25             (Base Construction Allocation -
    26             $350,000)
    27             (Land Allocation - $20,000)
    28             (Design and Contingencies - $120,000)
    29         (28)  SR 0208, SR 0208 over Deer Creek, Elk
    30             Township, Bridge Replacement                  505,000
    19990S0504B1471                 - 220 -

     1             (Base Construction Allocation -
     2             $450,000)
     3             (Land Allocation - $5,000)
     4             (Design and Contingencies - $50,000)
     5         (29)  SR 2007, SR 2007 over Deer Creek,
     6             Beaver Township, Bridge Replacement           455,000
     7             (Base Construction Allocation -
     8             $400,000)
     9             (Land Allocation - $5,000)
    10             (Design and Contingencies - $50,000)
    11         (30)  SR 4005, SR 4005 over Canoe Creek,
    12             Beaver Township, Bridge Replacement           405,000
    13             (Base Construction Allocation -
    14             $350,000)
    15             (Land Allocation - $5,000)
    16             (Design and Contingencies - $50,000)
    17         (31)  SR 4008, SR 4008 over Paint Creek,
    18             Knox Township, Bridge Replacement             505,000
    19             (Base Construction Allocation -
    20             $450,000)
    21             (Land Allocation - $5,000)
    22             (Design and Contingencies - $50,000)
    23         (32)  SR 0028, Redbank Creek Bridge over
    24             Tributary of Redbank Creek, Redbank
    25             Township, Bridge Rehabilitation             1,450,000
    26             (Base Construction Allocation -
    27             $1,000,000)
    28             (Land Allocation - $100,000)
    29             (Design and Contingencies - $350,000)
    30         (33)  SR 0028, Pine Creek Bridge over Pine
    19990S0504B1471                 - 221 -

     1             Creek, Redbank Township, Bridge
     2             Rehabilitation                              1,450,000
     3             (Base Construction Allocation -
     4             $1,000,000)
     5             (Land Allocation - $100,000)
     6             (Design and Contingencies - $350,000)
     7         (34)  SR 0028, Leisure Run Bridge over
     8             Leisure Run, Redbank Township, Bridge
     9             Replacement                                 1,450,000
    10             (Base Construction Allocation -
    11             $1,000,000)
    12             (Land Allocation - $100,000)
    13             (Design and Contingencies - $350,000)
    14         (35)  SR 0028, Walker Run Bridge over
    15             Walker Run, Redbank Township, Bridge
    16             Rehabilitation                              1,450,000
    17             (Base Construction Allocation -
    18             $1,000,000)
    19             (Land Allocation - $100,000)
    20             (Design and Contingencies - $350,000)
    21         (36)  SR 0066, Little Piney Bridge over
    22             Little Piney Creek, Clarion Township,
    23             Bridge Rehabilitation                       1,050,000
    24             (Base Construction Allocation -
    25             $750,000)
    26             (Land Allocation - $50,000)
    27             (Design and Contingencies - $250,000)
    28         (37)  SR 0066, Leisure Run Bridge over
    29             Leisure Run, Redbank Township, Bridge
    30             Rehabilitation                              1,050,000
    19990S0504B1471                 - 222 -

     1             (Base Construction Allocation -
     2             $750,000)
     3             (Land Allocation - $50,000)
     4             (Design and Contingencies - $250,000)
     5         (38)  SR 0068, Trout Run Bridge over Trout
     6             Run, Clarion Township, Bridge
     7             Rehabilitation                              1,050,000
     8             (Base Construction Allocation -
     9             $750,000)
    10             (Land Allocation - $50,000)
    11             (Design and Contingencies - $250,000)
    12         (39)  SR 0068, Craigs Run Bridge over
    13             Craigs Run, Monroe Township, Bridge
    14             Replacement                                 1,050,000
    15             (Base Construction Allocation -
    16             $750,000)
    17             (Land Allocation - $50,000)
    18             (Design and Contingencies - $250,000)
    19         (40)  SR 0068, Craigs Run Bridge over
    20             Craigs Run, Monroe Township, Bridge
    21             Rehabilitation                              1,050,000
    22             (Base Construction Allocation -
    23             $750,000)
    24             (Land Allocation - $50,000)
    25             (Design and Contingencies - $250,000)
    26         (41)  SR 0068, Reids Run Bridge over Reids
    27             Run, Monroe Township, Bridge
    28             Rehabilitation                              1,050,000
    29             (Base Construction Allocation -
    30             $750,000)
    19990S0504B1471                 - 223 -

     1             (Land Allocation - $50,000)
     2             (Design and Contingencies - $250,000)
     3         (42)  SR 0068, Brush Run Bridge over Brush
     4             Run, Monroe Township, Bridge
     5             Replacement                                 1,050,000
     6             (Base Construction Allocation -
     7             $750,000)
     8             (Land Allocation - $50,000)
     9             (Design and Contingencies - $250,000)
    10         (43)  SR 0068, Licking Creek Bridge over
    11             Licking Creek, Sligo Borough, Bridge
    12             Rehabilitation                              1,050,000
    13             (Base Construction Allocation -
    14             $750,000)
    15             (Land Allocation - $50,000)
    16             (Design and Contingencies - $250,000)
    17         (44)  SR 0080, I-80 Bridge over Coal Run,
    18             Beaver Township, Bridge Rehabilitation      1,450,000
    19             (Base Construction Allocation -
    20             $1,000,000)
    21             (Land Allocation - $100,000)
    22             (Design and Contingencies - $350,000)
    23         (45)  SR 0080, I-80 Bridge over Deer Creek,
    24             Beaver Township, Bridge Rehabilitation      1,450,000
    25             (Base Construction Allocation -
    26             $1,000,000)
    27             (Land Allocation - $100,000)
    28             (Design and Contingencies - $350,000)
    29         (46)  SR 0080, I-80 Bridge over Tributary
    30             of Clarion River, Beaver Township,
    19990S0504B1471                 - 224 -

     1             Bridge Rehabilitation                       1,450,000
     2             (Base Construction Allocation -
     3             $1,000,000)
     4             (Land Allocation - $100,000)
     5             (Design and Contingencies - $350,000)
     6         (47)  SR 0080, I-80 Bridge, Westbound over
     7             SR  2014, Clarion Township, Bridge
     8             Rehabilitation                              1,450,000
     9             (Base Construction Allocation -
    10             $1,000,000)
    11             (Land Allocation - $100,000)
    12             (Design and Contingencies - $350,000)
    13         (48)  SR 0080, I-80 Bridge, Eastbound over
    14             SR 2014, Clarion Township, Bridge
    15             Rehabilitation                              1,450,000
    16             (Base Construction Allocation -
    17             $1,000,000)
    18             (Land Allocation - $100,000)
    19             (Design and Contingencies - $350,000)
    20         (49)  SR 0080, I-80 Bridge over Boyd Run,
    21             Paint Township, Bridge Rehabilitation       1,450,000
    22             (Base Construction Allocation -
    23             $1,000,000)
    24             (Land Allocation - $100,000)
    25             (Design and Contingencies - $350,000)
    26         (50)  SR 0080, I-80 Bridge over Branch of
    27             Clarion River, Paint Township, Bridge
    28             Rehabilitation                              1,450,000
    29             (Base Construction Allocation -
    30             $1,000,000)
    19990S0504B1471                 - 225 -

     1             (Land Allocation - $100,000)
     2             (Design and Contingencies - $350,000)
     3         (51)  SR 0080, I-80 Bridge over Turkey Run,
     4             Richland Township, Bridge
     5             Rehabilitation                              1,450,000
     6             (Base Construction Allocation -
     7             $1,000,000)
     8             (Land Allocation - $100,000)
     9             (Design and Contingencies - $350,000)
    10         (52)  SR 2001, Piney Creek Bridge over
    11             Piney Creek, Limestone Township, Bridge
    12             Replacement                                   620,000
    13             (Base Construction Allocation -
    14             $500,000)
    15             (Land Allocation - $20,000)
    16             (Design and Contingencies - $100,000)
    17         (53)  SR 4008, Bridge over Shelter Run,
    18             Knox Township, Bridge Replacement             265,000
    19             (Base Construction Allocation -
    20             $180,000)
    21             (Land Allocation - $10,000)
    22             (Design and Contingencies - $75,000)
    23         (54)  SR 4005, I-80 Eastbound, Bridge over
    24             Canoe Creek, Beaver Township, Bridge
    25             Rehabilitation                                210,000
    26             (Base Construction Allocation -
    27             $180,000)
    28             (Design and Contingencies - $30,000)
    29         (55)  SR 4005, I-80 Westbound, Bridge over
    30             Canoe Creek, Beaver Township, Bridge
    19990S0504B1471                 - 226 -

     1             Rehabilitation                                210,000
     2             (Base Construction Allocation -
     3             $180,000)
     4             (Design and Contingencies - $30,000)
     5         (56)  SR 2003, Bridge over Branch of
     6             Leather Run, Monroe Township, Bridge
     7             Rehabilitation                                 60,000
     8             (Base Construction Allocation -
     9             $40,000)
    10             (Design and Contingencies - $20,000)
    11         (57)  SR 4027, Bridge over Deer Creek, Elk
    12             Township, Bridge Deck Replacement              60,000
    13             (Base Construction Allocation -
    14             $40,000)
    15             (Design and Contingencies - $20,000)
    16  Section 21.  Clearfield County.
    17     (a)  Local Bridges
    18         (1)  Knox Township, T-565 Bridge over Potts
    19             Run, Bridge Replacement                       510,000  <--
    20             (Base Construction Allocation -
    21             $350,000)
    22             (Land Allocation - $10,000)
    23             (Design and Contingencies - $150,000)
    24             RUN, BRIDGE REPLACEMENT                     1,145,000  <--
    25             (BASE CONSTRUCTION ALLOCATION -
    26             $900,000)
    27             (LAND ALLOCATION - $20,000)
    28             (DESIGN AND CONTINGENCIES - $225,000)
    29         (2)  Houtzdale Borough, McAteer Street
    30             Bridge, Bridge Replacement                    430,000
    19990S0504B1471                 - 227 -

     1             (Base Construction Allocation -
     2             $270,000)
     3             (Land Allocation - $20,000)
     4             (Design and Contingencies - $140,000)
     5         (3)  Penn Township, T-461 over Bell Run,
     6             Bridge Replacement                            106,000
     7             (Base Construction Allocation -
     8             $100,000)
     9             (Land Allocation - $1,000)
    10             (Design and Contingencies - $5,000)
    11         (4)  City of Dubois, Washington Avenue
    12             Bridge over Pentz Run, Bridge
    13             Replacement                                    63,000  <--
    14             (Base Construction Allocation -
    15             $45,000)
    16             (Land Allocation - $3,000)
    17             (Design and Contingencies - $15,000)
    18             REPLACEMENT                                   510,000  <--
    19             (BASE CONSTRUCTION ALLOCATION -
    20             $400,000)
    21             (LAND ALLOCATION - $10,000)
    22             (DESIGN AND CONTINGENCIES - $100,000)
    23         (5)  Sandy Township, T-854, Narrows Creek
    24             Bridge over Narrows Creek, Bridge
    25             Replacement                                   320,000
    26             (Base Construction Allocation -
    27             $240,000)
    28             (Land Allocation - $16,000)
    29             (Design and Contingencies - $64,000)
    30         (6)  Brady Township, T-353, Bridge over
    19990S0504B1471                 - 228 -

     1             East Branch of Mahoning Creek, Bridge
     2             Replacement                                   344,000
     3             (Base Construction Allocation -
     4             $272,000)
     5             (Land Allocation - $8,000)
     6             (Design and Contingencies - $64,000)
     7         (7)  Union Township, T-372, Conrail Bridge
     8             over Conrail, Bridge Removal                  515,000
     9             (Base Construction Allocation -
    10             $400,000)
    11             (Land Allocation - $15,000)
    12             (Design and Contingencies - $100,000)
    13         (8)  Sandy Township, T-584, Bridge over
    14             Narrows Creek, Bridge Replacement             620,000
    15             (Base Construction Allocation -
    16             $500,000)
    17             (Land Allocation - $20,000)
    18             (Design and Contingencies - $100,000)
    19         (9)  Bradford Township, T-210, Bridge over
    20             Millstone Run, Bridge Replacement             390,000
    21             (Base Construction Allocation -
    22             $300,000)
    23             (Land Allocation - $10,000)
    24             (Design and Contingencies - $80,000)
    25         (10)  KNOX TOWNSHIP, T-565, BRIDGE OVER                    <--
    26             POTTS RUN, BRIDGE REPLACEMENT                 510,000
    27             (BASE CONSTRUCTION ALLOCATION -
    28             $350,000)
    29             (LAND ALLOCATION - $10,000)
    30             (DESIGN AND CONTINGENCIES - $150,000)
    19990S0504B1471                 - 229 -

     1         (11)  BIGLER TOWNSHIP, T-564, FOURTH STREET
     2             BRIDGE OVER JAPLING RUN, BRIDGE
     3             REPLACEMENT                                   210,000
     4             (BASE CONSTRUCTION ALLOCATION -
     5             $150,000)
     6             (LAND ALLOCATION - $10,000)
     7             (DESIGN AND CONTINGENCIES - $50,000)
     8         (12)  FERGUSON TOWNSHIP, T-426 OVER GAZZAM
     9             RUN, BRIDGE REPLACEMENT                       420,000
    10             (BASE CONSTRUCTION ALLOCATION -
    11             $315,000)
    12             (LAND ALLOCATION - $5,000)
    13             (DESIGN AND CONTINGENCIES - $100,000)
    14         (13)  LAWRENCE TOWNSHIP, T-519 OVER MOOSE
    15             CREEK, BRIDGE REPLACEMENT                     520,000
    16             (BASE CONSTRUCTION ALLOCATION -
    17             $400,000)
    18             (LAND ALLOCATION - $20,000)
    19             (DESIGN AND CONTINGENCIES - $100,000)
    20         (14)  GREENWOOD TOWNSHIP, T-420 OVER CURRY
    21             RUN, BRIDGE REPLACEMENT                       575,000
    22             (BASE CONSTRUCTION ALLOCATION -
    23             $425,000)
    24             (LAND ALLOCATION - $10,000)
    25             (DESIGN AND CONTINGENCIES - $140,000)
    26     (b)  State Bridges
    27         (1)  SR 0879, Bridge over US 322 near
    28             Clearfield Mall, Lawrence Township,
    29             Bridge Painting                               644,000
    30             (Base Construction Allocation -
    19990S0504B1471                 - 230 -

     1             $614,000)
     2             (Design and Contingencies - $30,000)
     3         (2)  SR 0729, Bridge over Muddy Run,
     4             Beccaria Township, Bridge Painting             35,000  <--
     5             (Base Construction Allocation -
     6             $30,000)
     7             (Design and Contingencies - $5,000)
     8             BECCARIA TOWNSHIP, BRIDGE REPLACEMENT         570,000  <--
     9             (BASE CONSTRUCTION ALLOCATION -
    10             $400,000)
    11             (DESIGN AND CONTINGENCIES - $170,000)
    12         (3)  SR 0879, Bridge over Susquehanna
    13             River, Lawrence Township, Bridge
    14             Painting                                      183,000  <--
    15             (Base Construction Allocation -
    16             $163,000)
    17             (Design and Contingencies - $20,000)
    18             PAINTING                                      538,000  <--
    19             (BASE CONSTRUCTION ALLOCATION -
    20             $533,000)
    21             (DESIGN AND CONTINGENCIES  - $5,000)
    22         (4)  SR 0970, Bridge over Moshannon Creek,
    23             Osceola Mills, Bridge Painting                145,000
    24             (Base Construction Allocation -
    25             $120,000)
    26             (Design and Contingencies - $25,000)
    27         (5)  SR 0970, Bridge over Susquehanna
    28             River, Village of Shawville, Bridge
    29             Painting                                      163,000
    30             (Base Construction Allocation -
    19990S0504B1471                 - 231 -

     1             $143,000)
     2             (Design and Contingencies - $20,000)
     3         (6)  SR 1009, Bridge over Alder Run, Morris
     4             Township, Bridge Painting                      18,000  <--
     5             (Base Construction Allocation -
     6             $15,000)
     7             (Design and Contingencies - $3,000)
     8         (7)  SR 1014, Bridge over Alder Run, Graham
     9             Township, Bridge Painting                      18,000
    10             (Base Construction Allocation -
    11             $15,000)
    12             (Design and Contingencies - $3,000)
    13             TOWNSHIP, BRIDGE REPLACEMENT                  265,000  <--
    14             (BASE CONSTRUCTION ALLOCATION -
    15             $200,000)
    16             (DESIGN AND CONTINGENCIES - $65,000)
    17         (7)  SR 1014, BRIDGE OVER ALDER RUN, GRAHAM
    18             TOWNSHIP, BRIDGE REPLACEMENT                  570,000
    19             (BASE CONSTRUCTION ALLOCATION -
    20             $400,000)
    21             (DESIGN AND CONTINGENCIES - $170,000)
    22         (8)  SR 2010, Bridge over Beaver Run,
    23             Woodward Township, Bridge Painting             18,000
    24             (Base Construction Allocation -
    25             $15,000)
    26             (Design and Contingencies - $3,000)
    27         (9)  SR 2024, Bridge over Conrail, Pike
    28             Township, Bridge Painting                      28,000  <--
    29             (Base Construction Allocation -
    30             $24,000)
    19990S0504B1471                 - 232 -

     1             (Design and Contingencies - $4,000)
     2             TOWNSHIP, BRIDGE PAINTING                      50,000  <--
     3         (10)  SR 3001, Bridge over Chest Creek,
     4             Mahaffey Borough, Bridge Replacement        1,750,000
     5             (Base Construction Allocation -
     6             $1,300,000)
     7             (Land Allocation - $150,000)
     8             (Design and Contingencies - $300,000)
     9         (11)  SR 3012, Bridge over Matthews Run,
    10             Beccaria Township, Bridge Painting             18,000
    11             (Base Construction Allocation -
    12             $15,000)
    13             (Design and Contingencies - $3,000)
    14         (12)  SR 3012, Bridge over Clearfield
    15             Creek, Beccaria Township, Bridge
    16             Painting                                      100,000  <--
    17             (Base Construction Allocation -
    18             $90,000)
    19             (Design and Contingencies - $10,000)
    20             REPLACEMENT                                   150,000  <--
    21             (BASE CONSTRUCTION ALLOCATION -
    22             $125,000)
    23             (DESIGN AND CONTINGENCIES - $25,000)
    24         (13)  SR 0219, SR 0219 over Bear Run, Bell
    25             Township, Bridge Replacement                  505,000
    26             (Base Construction Allocation -
    27             $450,000)
    28             (Land Allocation - $5,000)
    29             (Design and Contingencies - $50,000)
    30         (14)  SR 2014, Bridge over Coal Run,                       <--
    19990S0504B1471                 - 233 -

     1             Decatur Township, Bridge Replacement          692,000
     2             (Base Construction Allocation -
     3             $512,000)
     4             (Land Allocation - $30,000)
     5             (Design and Contingencies - $150,000)
     6         (14)  SR 2014, BRIDGE OVER COAL RUN,                       <--
     7             DECATUR TOWNSHIP, BRIDGE REPLACEMENT          702,000
     8             (BASE CONSTRUCTION ALLOCATION -
     9             $512,000)
    10             (LAND ALLOCATION - $30,000)
    11             (DESIGN AND CONTINGENCIES - $160,000)
    12         (15)  SR 3012, Bridge over Clearfield
    13             Creek, Beccaria Township, Bridge
    14             Painting                                       18,000
    15             (Base Construction Allocation -
    16             $15,000)
    17             (Design and Contingencies - $3,000)
    18         (16)  SR 0255, Bridge over Tyler Run,
    19             Village of Hollywood, Huston Township,
    20             Bridge Replacement                            500,000
    21             (Base Construction Allocation -
    22             $400,000)
    23             (Land Allocation - $20,000)
    24             (Design and Contingencies - $80,000)
    25         (17)  SR 3009, Bridge over Kuhns Run, Bell
    26             Township, Bridge Rehabilitation               105,000
    27             (Base Construction Allocation -
    28             $80,000)
    29             (Land Allocation - $5,000)
    30             (Design and Contingencies - $20,000)
    19990S0504B1471                 - 234 -

     1         (18)  SR 0219, Clear Run Bridge over Clear
     2             Run, City of Dubois, Bridge
     3             Replacement                                   760,000
     4             (Base Construction Allocation -
     5             $600,000)
     6             (Land Allocation - $10,000)
     7             (Design and Contingencies - $150,000)
     8         (19)  SR 0219, Bear Creek Bridge over Bear
     9             Creek, McGees Mills Township, Bridge
    10             Replacement                                   825,000
    11             (Base Construction Allocation -
    12             $700,000)
    13             (Land Allocation - $25,000)
    14             (Design and Contingencies - $100,000)
    15         (20)  SR 0322, Bridge over Clearfield Creek
    16             Lawrence Township, Bridge
    17             Rehabilitation                              1,400,000
    18             (Base Construction Allocation -
    19             $1,200,000)
    20             (Land Allocation - $50,000)
    21             (Design and Contingencies - $150,000)
    22         (21)  SR 0879, Corman Railroad Bridge over
    23             SR 0879, Widen and Flatten Slope,
    24             Curwensville Borough, Bridge Removal        1,050,000
    25             (Base Construction Allocation -
    26             $800,000)
    27             (Land Allocation - $100,000)
    28             (Design and Contingencies - $150,000)
    29         (22)  SR 0879, Bridge over Railroad &
    30             Susquehanna River, Lawrence Township,
    19990S0504B1471                 - 235 -

     1             Bridge Painting                               260,000
     2             (Base Construction Allocation -
     3             $250,000)
     4             (Design and Contingencies - $10,000)
     5         (23)  SR 0879, Bridge over US 322, Lawrence
     6             Township, Bridge Rehabilitation               160,000
     7             (Base Construction Allocation -
     8             $150,000)
     9             (Design and Contingencies - $10,000)
    10         (24)  SR 0970, Bridge over West Branch of
    11             Susquehanna River, Bradford Township
    12             and Goshen Township, Bridge Painting          820,000
    13             (Base Construction Allocation -
    14             $800,000)
    15             (Design and Contingencies - $20,000)
    16         (25)  SR 2024, Rails/Trails Bridge over                    <--
    17             Rails to Trails, Pike Township, Bridge
    18             Painting                                      135,000
    19             (Base Construction Allocation -
    20             $130,000)
    21         (25)  SR 2024, RAILS/TRAILS BRIDGE OVER                    <--
    22             RAILS TO TRAILS, PIKE TOWNSHIP, BRIDGE
    23             PAINTING                                      141,000
    24             (BASE CONSTRUCTION ALLOCATION -
    25             $136,000)
    26             (Design and Contingencies - $5,000)
    27         (26)  I-80, Westbound Side of Bridge at
    28             Clearfield and Jefferson County Line,
    29             Bridge Rehabilitation                       1,670,000
    30             (Base Construction Allocation -
    19990S0504B1471                 - 236 -

     1             $1,670,000)
     2         (27)  SR 0879, Anderson Creek Bridge near
     3             Curwensville Borough, Bridge
     4             Replacement                                 1,325,000
     5             (Base Construction Allocation -
     6             $1,100,000)
     7             (Land Allocation - $25,000)
     8             (Design and Contingencies - $200,000)
     9         (28)  SR 2011, Bridge over Morgan Run,
    10             Bigler Township, Bridge Replacement           520,000
    11             (Base Construction Allocation -
    12             $400,000)
    13             (Land Allocation - $20,000)
    14             (Design and Contingencies - $100,000)
    15         (29)  SR 3019, Bridge over Clearfield
    16             Creek, Coalport Borough, Bridge
    17             Replacement                                 1,350,000
    18             (Base Construction Allocation -
    19             $1,100,000)
    20             (Land Allocation - $50,000)
    21             (Design and Contingencies - $200,000)
    22         (30)  SR 4027, Bridge over Deer Creek, Elk
    23             Township, Bridge Deck Replacement              60,000
    24             (Base Construction Allocation -
    25             $40,000)
    26             (Design and Contingencies - $20,000)
    27         (31)  SR 0053, Bridge over Big Run, Osceola
    28             Mills Borough, Bridge Replacement             350,000
    29             (Base Construction Allocation -
    30             $250,000)
    19990S0504B1471                 - 237 -

     1             (Land Allocation - $20,000)
     2             (Design and Contingencies - $80,000)
     3         (32)  SR 0153, Bridge over Clearfield
     4             Creek, Boggs and Lawrence Townships,
     5             Bridge Rehabilitation                         650,000  <--
     6             (Base Construction Allocation -
     7             $600,000)
     8             (Land Allocation - $10,000)
     9             (Design and Contingencies - $40,000)
    10             BRIDGE REHABILITATION                       3,250,000  <--
    11             (BASE CONSTRUCTION ALLOCATION -
    12             $3,000,000)
    13             (LAND ALLOCATION - $50,000)
    14             (DESIGN AND CONTINGENCIES - $200,000)
    15         (33)  SR 1001, Bridge over Montgomery Run,
    16             Lawrence Township, Bridge Replacement         114,000  <--
    17             (Base Construction Allocation -
    18             $80,000)
    19             (Land Allocation - $4,000)
    20             (Design and Contingencies - $30,000)
    21             LAWRENCE TOWNSHIP, BRIDGE REPLACEMENT         570,000  <--
    22             (BASE CONSTRUCTION ALLOCATION -
    23             $400,000)
    24             (LAND ALLOCATION - $20,000)
    25             (DESIGN AND CONTINGENCIES - $150,000)
    26         (34)  SR 1014, Bridge over Adler Run,
    27             Graham Township at Kylertown, Bridge
    28             Rehabilitation                                 84,000  <--
    29             (Base Construction Allocation -
    30             $50,000)
    19990S0504B1471                 - 238 -

     1             (Land Allocation - $4,000)
     2             (Design and Contingencies - $30,000)
     3             REPLACEMENT                                   265,000  <--
     4             (BASE CONSTRUCTION ALLOCATION -
     5             $60,000)
     6             (LAND ALLOCATION - $5,000)
     7             (DESIGN AND CONTINGENCIES - $200,000)
     8         (35)  SR 2011, Bridge over Morgan Run,
     9             Bigler Township, Bridge Replacement           520,000
    10             (Base Construction Allocation -
    11             $400,000)
    12             (Land Allocation - $20,000)
    13             (Design and Contingencies - $100,000)
    14         (36)  SR 3012, Bridge over Clearfield                      <--
    15             Creek, Coalport Borough, Bridge
    16             Replacement                                   248,000
    17             (Base Construction Allocation -
    18             $200,000)
    19             (Land Allocation - $8,000)
    20             (Design and Contingencies - $40,000)
    21         (36)  SR 3012, BRIDGE OVER CLEARFIELD                      <--
    22             CREEK, COALPORT BOROUGH, BRIDGE
    23             REPLACEMENT                                 1,240,000
    24             (BASE CONSTRUCTION ALLOCATION -
    25             $1,000,000)
    26             (LAND ALLOCATION - $40,000)
    27             (DESIGN AND CONTINGENCIES - $200,000)
    28         (37)  SR 2007, Brisbin Bridge, Bridge
    29             Replacement                                   301,000
    30             (Base Construction Allocation -
    19990S0504B1471                 - 239 -

     1             $250,000)
     2             (Land Allocation - $1,000)
     3             (Design and Contingencies - $50,000)
     4         (38)  Juniata Street Bridge over Clear Run,
     5             City of Dubois, Bridge Replacement            620,000
     6             (Base Construction Allocation -
     7             $500,000)
     8             (Land Allocation - $20,000)
     9             (Design and Contingencies - $100,000)
    10         (39)  SR 4020, Bridge over Clear Run,
    11             Dubois City, Sandy Township, Bridge
    12             Replacement                                   360,000
    13             (Base Construction Allocation -
    14             $200,000)
    15             (Land Allocation - $10,000)
    16             (Design and Contingencies - $150,000)
    17         (40)  SR 0153, BRIDGE OVER CLEARFIELD                      <--
    18             CREEK, BOGGS AND LAWRENCE TOWNSHIPS,
    19             BRIDGE REHABILITATION                       1,350,000
    20             (BASE CONSTRUCTION ALLOCATION -
    21             $1,200,000)
    22             (DESIGN AND CONTINGENCIES - $150,000)
    23         (41)  SR 0879, BRIDGE OVER US 322, LAWRENCE
    24             TOWNSHIP, BRIDGE REHABILITATION               644,000
    25             (BASE CONSTRUCTION ALLOCATION -
    26             $614,000)
    27             (DESIGN AND CONTINGENCIES - $30,000)
    28         (42)  SR 1014, BRIDGE OVER ADLER RUN,
    29             GRAHAM TOWNSHIP, BRIDGE REPLACEMENT           570,000
    30             (BASE CONSTRUCTION ALLOCATION -
    19990S0504B1471                 - 240 -

     1             $400,000)
     2             (LAND ALLOCATION - $20,000)
     3             (DESIGN AND CONTINGENCIES - $150,000)
     4         (43)  SR 3019, BRIDGE OVER CLEARFIELD
     5             CREEK, COALPORT BOROUGH, BRIDGE
     6             REPLACEMENT                                 1,350,000
     7             (BASE CONSTRUCTION ALLOCATION -
     8             $1,100,000)
     9             (LAND ALLOCATION - $50,000)
    10             (DESIGN AND CONTINGENCIES - $200,000)
    11         (44)  SR 0879, ANDERSON CREEK BRIDGE, PIKE
    12             TOWNSHIP, BRIDGE REPLACEMENT                1,400,000
    13             (BASE CONSTRUCTION ALLOCATION -
    14             $1,100,000
    15             (LAND ALLOCATION - $25,000)
    16             (DESIGN AND CONTINGENCIES - $275,000)
    17         (45)  SR 0322, US 322 OVER CLEARFIELD
    18             CREEK, LAWRENCE TOWNSHIP, BRIDGE
    19             PAINTING                                    1,220,000
    20             (BASE CONSTRUCTION ALLOCATION -
    21             $1,200,000)
    22             (DESIGN AND CONTINGENCIES - $20,000)
    23  Section 22.  Clinton County.
    24     (a)  Local Bridges
    25         (1)  Mill Hall Borough, Church Street over
    26             Fishing Creek, Bridge Rehabilitation            5,000
    27             (Base Construction Allocation - $4,000)
    28             (Design and Contingencies - $1,000)
    29         (2)  Lamar Township, T-352 over Duck Run,
    30             Bridge Replacement                            440,000
    19990S0504B1471                 - 241 -

     1             (Base Construction Allocation -
     2             $350,000)
     3             (Land Allocation - $10,000)
     4             (Design and Contingencies - $80,000)
     5         (3)  Bald Eagle Township, T-381, Mill Race
     6             Bridge over Mill Race, Bridge
     7             Replacement                                   300,000
     8             (Base Construction Allocation -
     9             $200,000)
    10             (Land Allocation - $20,000)
    11             (Design and Contingencies - $80,000)
    12         (4)  Leidy Township, T-545, Hammersley Fork
    13             Bridge over Hammersley Fork, Bridge
    14             Replacement                                   510,000
    15             (Base Construction Allocation -
    16             $400,000)
    17             (Land Allocation - $10,000)
    18             (Design and Contingencies - $100,000)
    19     (b)  State Bridges
    20         (1)  SR 0044, Bridge over SR 0220, 1 Mile
    21             Northeast of Avis, Pine Creek Township,
    22             Bridge Painting                               580,000
    23             (Base Construction Allocation -
    24             $525,000)
    25             (Design and Contingencies - $55,000)
    26         (2)  SR 0080, Lamar Interchange (Two
    27             Bridges) over PA 64 at Exit 25, Porter
    28             Township, Bridge Rehabilitation             4,100,000
    29             (Base Construction Allocation -
    30             $3,400,000)
    19990S0504B1471                 - 242 -

     1             (Design and Contingencies - $700,000)
     2         (3)  SR 0144, Bridge over Kettle Creek, 1
     3             Mile East of Hammersley Fork, Leidy
     4             Township, Bridge Painting                     660,000
     5             (Base Construction Allocation -
     6             $600,000)
     7             (Design and Contingencies - $60,000)
     8         (4)  SR 0044, Pine Creek Bridge over Pine
     9             Creek, Grugan Township, Bridge
    10             Replacement                                 2,850,000
    11             (Base Construction Allocation -
    12             $2,400,000)
    13             (Land Allocation - $50,000)
    14             (Design and Contingencies - $400,000)
    15         (5)  SR 0144, Bridge over Kettle Creek,
    16             Leidy Township, Bridge Painting               590,000
    17             (Base Construction Allocation -
    18             $580,000)
    19             (Design and Contingencies - $10,000)
    20         (6)  SR 0144, Hammersley Fork Bridge over
    21             Hammersley Fork, Leidy Township, Bridge
    22             Painting                                      130,000
    23             (Base Construction Allocation -
    24             $125,000)
    25             (Design and Contingencies - $5,000)
    26         (7)  SR 0150, Laurel Run Bridge over Laurel
    27             Run, Bald Eagle Township, Bridge
    28             Replacement                                   285,000
    29             (Base Construction Allocation -
    30             $175,000)
    19990S0504B1471                 - 243 -

     1             (Land Allocation - $10,000)
     2             (Design and Contingencies - $100,000)
     3         (8)  SR 0150, Bald Eagle Creek Bridge over
     4             Bald Eagle Creek, Bald Eagle Township,
     5             Bridge Replacement                          1,370,000
     6             (Base Construction Allocation -
     7             $1,100,000)
     8             (Land Allocation - $20,000)
     9             (Design and Contingencies - $250,000)
    10         (9)  SR 0150, Masden Run Bridge over Masden
    11             Run, Beech Creek Township, Bridge
    12             Replacement                                   320,000
    13             (Base Construction Allocation -
    14             $210,000)
    15             (Land Allocation - $10,000)
    16             (Design and Contingencies - $100,000)
    17         (10)  SR 1002, Chatham Run Bridge, Pine
    18             Creek Township, Bridge Replacement            475,000
    19             (Base Construction Allocation -
    20             $345,000)
    21             (Land Allocation - $10,000)
    22             (Design and Contingencies - $120,000)
    23         (11)  SR 2004, Big Fishing Creek Bridge
    24             over Big Fishing Creek, Porter
    25             Township, Bridge Replacement                  720,000
    26             (Base Construction Allocation -
    27             $550,000)
    28             (Land Allocation - $20,000)
    29             (Design and Contingencies - $150,000)
    30         (12)  SR 2019, Laurel Run Bridge over
    19990S0504B1471                 - 244 -

     1             Laurel Run, Bald Eagle Township, Bridge
     2             Painting                                        8,000
     3             (Base Construction Allocation - $7,000)
     4             (Design and Contingencies - $1,000)
     5         (13)  SR 0120, Bridge over Shintown Run,
     6             Noyes Township, Bridge Replacement            440,000
     7             (Base Construction Allocation -
     8             $300,000)
     9             (Land Allocation - $20,000)
    10             (Design and Contingencies - $120,000)
    11  Section 23.  Columbia County.
    12     (a)  Local Bridges
    13         (1)  Catawissa Township, T-422, Bridge over
    14             Catawissa Creek, Bridge Replacement           840,000
    15             (Base Construction Allocation -
    16             $615,000)
    17             (Land Allocation - $10,000)
    18             (Design and Contingencies - $215,000)
    19         (2)  Cleveland Township, T-373, Bridge over
    20             Roaring Creek, Bridge Replacement             820,000
    21             (Base Construction Allocation -
    22             $630,000)
    23             (Land Allocation - $40,000)
    24             (Design and Contingencies - $150,000)
    25         (3)  Greenwood Township, T-572, Bridge over
    26             Mud Run, Bridge Replacement                   393,000
    27             (Base Construction Allocation -
    28             $336,000)
    29             (Land Allocation - $10,000)
    30             (Design and Contingencies - $47,000)
    19990S0504B1471                 - 245 -

     1         (4)  Locust Township, T-361, Bridge over
     2             Roaring Creek, Bridge Replacement             465,000
     3             (Base Construction Allocation -
     4             $335,000)
     5             (Land Allocation - $30,000)
     6             (Design and Contingencies - $100,000)
     7         (5)  Main Township, T-468, Bridge over
     8             Catawissa Creek, Bridge Replacement         1,992,000
     9             (Base Construction Allocation -
    10             $1,662,000)
    11             (Land Allocation - $80,000)
    12             (Design and Contingencies - $250,000)
    13         (6)  Bloomsburg and Montour Townships,
    14             Train Street, Bridge over Fishing
    15             Creek, Bridge Replacement                   1,330,000
    16             (Base Construction Allocation -
    17             $1,100,000)
    18             (Land Allocation - $10,000)
    19             (Design and Contingencies - $220,000)
    20         (7)  North Centre Township, T-481, Bridge
    21             over West Branch Briar Creek, Bridge
    22             Replacement                                   410,000
    23             (Base Construction Allocation -
    24             $250,000)
    25             (Land Allocation - $30,000)
    26             (Design and Contingencies - $130,000)
    27         (8)  North Centre Township, T-507, Bridge
    28             over North Branch Briar Creek, Bridge
    29             Replacement                                   405,000
    30             (Base Construction Allocation -
    19990S0504B1471                 - 246 -

     1             $265,000)
     2             (Land Allocation - $20,000)
     3             (Design and Contingencies - $120,000)
     4         (9)  North Centre Township, T-730, Bridge
     5             over West Branch Briar Creek, Bridge
     6             Replacement                                   405,000
     7             (Base Construction Allocation -
     8             $265,000)
     9             (Land Allocation - $20,000)
    10             (Design and Contingencies - $120,000)
    11         (10)  Orange Township, T-575, Bridge over
    12             Mud Run, Bridge Replacement                   665,000
    13             (Base Construction Allocation -
    14             $532,000)
    15             (Land Allocation - $100,000)
    16             (Design and Contingencies - $33,000)
    17         (11)  Pine and Greenwood Townships, T-548,
    18             Bridge over Little Fishing Creek,
    19             Bridge Replacement                            500,000
    20             (Base Construction Allocation -
    21             $390,000)
    22             (Land Allocation - $10,000)
    23             (Design and Contingencies - $100,000)
    24         (12)  Scott Township, T-514, Bridge over
    25             Tributary of Fishing Creek, Bridge
    26             Replacement                                   480,000
    27             (Base Construction Allocation -
    28             $320,000)
    29             (Land Allocation - $30,000)
    30             (Design and Contingencies - $130,000)
    19990S0504B1471                 - 247 -

     1     (b)  State Bridges
     2         (1)  SR 0044, Chillisquaque Creek Bridge
     3             over Chillisquaque Creek, 3 Miles
     4             Northwest of Jerseytown, Bridge
     5             Replacement                                   477,000
     6             (Base Construction Allocation -
     7             $382,000)
     8             (Land Allocation - $24,000)
     9             (Design and Contingencies - $71,000)
    10         (2)  SR 0093, Bridge over North Branch of
    11             Briar Creek, Bridge Replacement               350,000
    12             (Base Construction Allocation -
    13             $275,000)
    14             (Land Allocation - $15,000)
    15             (Design and Contingencies - $60,000)
    16         (3)  SR 0093, Briar Creek Bridge over Briar
    17             Creek, 3 Miles West of Berwick, Bridge
    18             Replacement                                   392,000
    19             (Base Construction Allocation -
    20             $315,000)
    21             (Land Allocation - $18,000)
    22             (Design and Contingencies - $59,000)
    23         (4)  SR 0239, West Creek Bridge over West
    24             Creek, Southeast of Benton and
    25             Sugarloaf Townships, Bridge
    26             Replacement                                   670,000
    27             (Base Construction Allocation -
    28             $536,000)
    29             (Land Allocation - $34,000)
    30             (Design and Contingencies - $100,000)
    19990S0504B1471                 - 248 -

     1         (5)  SR 0442, West Branch Run Bridge over
     2             West Branch Run, 1.5 Miles North of
     3             Iola, Bridge Replacement                      206,000
     4             (Base Construction Allocation -
     5             $165,000)
     6             (Land Allocation - $10,000)
     7             (Design and Contingencies - $31,000)
     8         (6)  SR 1004, Erie-Lackawanna Railroad
     9             Bridge, Viaduct over Conrail, South
    10             Centre Township, Bridge Replacement         1,900,000
    11             (Base Construction Allocation -
    12             $1,600,000)
    13             (Land Allocation - $110,000)
    14             (Design and Contingencies - $190,000)
    15         (7)  SR 1019, Briar Creek Bridge over Briar
    16             Creek, Briar Creek Township, Bridge
    17             Replacement                                   404,000
    18             (Base Construction Allocation -
    19             $323,000)
    20             (Land Allocation - $20,000)
    21             (Design and Contingencies - $61,000)
    22         (8)  SR 4012, Little Hemlock Creek Bridge
    23             over Little Hemlock Creek, 10 Miles
    24             Southeast of Jerseytown, Bridge
    25             Replacement                                   284,000
    26             (Base Construction Allocation -
    27             $227,000)
    28             (Land Allocation - $14,000)
    29             (Design and Contingencies - $43,000)
    30         (9)  SR 4037, Mud Run Bridge over Mud Run,
    19990S0504B1471                 - 249 -

     1             5 Miles Northwest of Millville Borough,
     2             Bridge Replacement                            307,000
     3             (Base Construction Allocation -
     4             $246,000)
     5             (Land Allocation - $15,000)
     6             (Design and Contingencies - $46,000)
     7         (10)  SR 0011, Bridge over Fishing Creek,
     8             Bridge Painting                               530,000
     9             (Base Construction Allocation -
    10             $520,000)
    11             (Design and Contingencies - $10,000)
    12         (11)  SR 1022, Bridge over Fishing Creek,
    13             Bridge Painting                               380,000
    14             (Base Construction Allocation -
    15             $370,000)
    16             (Design and Contingencies - $10,000)
    17         (12)  SR 1022, Bridge over Old Channel,
    18             Bridge Painting                               125,000
    19             (Base Construction Allocation -
    20             $115,000)
    21             (Design and Contingencies - $10,000)
    22         (13)  SR 4009, Bridge over Fishing Creek,
    23             Bridge Painting                               315,000
    24             (Base Construction Allocation -
    25             $305,000)
    26             (Design and Contingencies - $10,000)
    27         (14)  SR 0042, SR 0042 over Roaring Creek,
    28             Conyngham Township, Bridge Replacement        457,000
    29             (Base Construction Allocation -
    30             $366,000)
    19990S0504B1471                 - 250 -

     1             (Land Allocation - $23,000)
     2             (Design and Contingencies - $68,000)
     3         (15)  SR 0239, SR 0239 over West Creek,
     4             Benton Township, Bridge Replacement           760,000
     5             (Base Construction Allocation -
     6             $560,000)
     7             (Land Allocation - $35,000)
     8             (Design and Contingencies - $165,000)
     9         (16)  SR 0254, SR 0254 over Little Fishing
    10             Creek, Millville Borough, Bridge
    11             Replacement                                 1,020,000
    12             (Base Construction Allocation -
    13             $816,000)
    14             (Land Allocation - $51,000)
    15             (Design and Contingencies - $153,000)
    16         (17)  SR 0339, SR 0339 over Beaver Run,
    17             Beaver Township, Bridge Replacement           320,000
    18             (Base Construction Allocation -
    19             $256,000)
    20             (Land Allocation - $16,000)
    21             (Design and Contingencies - $48,000)
    22         (18)  SR 0487, SR 0487 over Stony Brook,
    23             Orange Township, Bridge Replacement           380,000
    24             (Base Construction Allocation -
    25             $304,000)
    26             (Land Allocation - $19,000)
    27             (Design and Contingencies - $57,000)
    28         (19)  SR 1014, SR 1014 over Little Briar
    29             Creek, Briar Creek Township, Bridge
    30             Replacement                                   415,000
    19990S0504B1471                 - 251 -

     1             (Base Construction Allocation -
     2             $332,000)
     3             (Land Allocation - $21,000)
     4             (Design and Contingencies - $62,000)
     5         (20)  SR 1023, SR 1023 over East Briar
     6             Creek, Briar Creek Township, Bridge
     7             Replacement                                   520,000
     8             (Base Construction Allocation -
     9             $466,000)
    10             (Land Allocation - $29,000)
    11             (Design and Contingencies - $25,000)
    12         (21)  SR 2003, SR 2003 over Tributary of
    13             Roaring Creek, Roaring Creek Township,
    14             Bridge Replacement                            171,000
    15             (Base Construction Allocation -
    16             $136,000)
    17             (Land Allocation - $10,000)
    18             (Design and Contingencies - $25,000)
    19         (22)  SR 2003, SR 2003 over Tributary of
    20             Roaring Creek, Locust Township, Bridge
    21             Replacement                                   245,000
    22             (Base Construction Allocation -
    23             $196,000)
    24             (Land Allocation - $12,000)
    25             (Design and Contingencies - $37,000)
    26         (23)  SR 2009, SR 2009 over Catawissa
    27             Creek, Main Township, Bridge
    28             Replacement                                   436,000
    29             (Base Construction Allocation -
    30             $349,000)
    19990S0504B1471                 - 252 -

     1             (Land Allocation - $22,000)
     2             (Design and Contingencies - $65,000)
     3         (24)  SR 4009, SR 4009 over Little Fishing
     4             Creek, Mt. Pleasant Township, Bridge
     5             Replacement                                 1,232,000
     6             (Base Construction Allocation -
     7             $986,000)
     8             (Land Allocation - $61,000)
     9             (Design and Contingencies - $185,000)
    10         (25)  SR 4033, SR 4033 over Wolfhouse Run,
    11             Pine Township, Bridge Replacement             252,000
    12             (Base Construction Allocation -
    13             $202,000)
    14             (Land Allocation - $12,000)
    15             (Design and Contingencies - $38,000)
    16         (26)  SR 4045, SR 4045 over Green Creek,
    17             Greenwood Township, Bridge Replacement        435,000
    18             (Base Construction Allocation -
    19             $348,000)
    20             (Land Allocation - $22,000)
    21             (Design and Contingencies - $65,000)
    22         (27)  SR 4049, SR 4049 over Coles Creek,
    23             Sugarloaf Township, Bridge Replacement      1,095,000
    24             (Base Construction Allocation -
    25             $876,000)
    26             (Land Allocation - $55,000)
    27             (Design and Contingencies - $164,000)
    28         (28)  SR 0080, I-80 Bridge over North
    29             Branch of Susquehanna River, Mifflin
    30             Township, Bridge Replacement               36,550,000
    19990S0504B1471                 - 253 -

     1             (Base Construction Allocation -
     2             $34,000,000)
     3             (Land Allocation - $50,000)
     4             (Design and Contingencies - $2,500,000)
     5         (29)  SR 8006, SR 8006 Ramp W Bridge, Lime
     6             Ridge Interchange, South Centre
     7             Township, Bridge Deck Replacement             700,000
     8             (Base Construction Allocation -
     9             $600,000)
    10             (Design and Contingencies - $100,000)
    11  Section 24.  Crawford County.
    12     (a) Local Bridges
    13         (1)  Fairfield Township, T-636 over Branch
    14             of French Creek, Bridge Replacement           108,000
    15             (Base Construction Allocation -
    16             $100,000)
    17             (Land Allocation - $1,000)
    18             (Design and Contingencies - $7,000)
    19         (2)  Fairfield Township, T-321 Bridge No.1
    20             over Branch of French Creek, Bridge
    21             Replacement                                   106,000
    22             (Base Construction Allocation -
    23             $100,000)
    24             (Land Allocation - $1,000)
    25             (Design and Contingencies - $5,000)
    26         (3)  Fairfield Township, T-321 Bridge No.2
    27             over Branch of French Creek, Bridge
    28             Replacement                                   106,000
    29             (Base Construction Allocation -
    30             $100,000)
    19990S0504B1471                 - 254 -

     1             (Land Allocation - $1,000)
     2             (Design and Contingencies - $5,000)
     3         (4)  Spring Township, T-747 over Branch of
     4             Conneaut Creek, Bridge Replacement            126,000
     5             (Base Construction Allocation -
     6             $120,000)
     7             (Land Allocation - $1,000)
     8             (Design and Contingencies - $5,000)
     9         (5)  Wayne Township, T-347 over Branch of
    10             Powdermill Run, Bridge Replacement            106,000
    11             (Base Construction Allocation -
    12             $100,000)
    13             (Land Allocation - $1,000)
    14             (Design and Contingencies - $5,000)
    15         (6)  Wayne Township, T-457 over Tributary
    16             of Lake Creek, Bridge Replacement             106,000
    17             (Base Construction Allocation -
    18             $100,000)
    19             (Land Allocation - $1,000)
    20             (Design and Contingencies - $5,000)
    21         (7)  Vernon Township, T-487, Sportsman's
    22             Road Bridge over Watson Run, Bridge
    23             Replacement                                   460,000
    24             (Base Construction Allocation -
    25             $400,000)
    26             (Land Allocation - $10,000)
    27             (Design and Contingencies - $50,000)
    28         (8)  Woodcock Township, T-653, Morris Road
    29             Bridge over Conrail, Bridge
    30             Replacement                                   360,000
    19990S0504B1471                 - 255 -

     1         (9)  City of Titusville, Walnut Street
     2             Bridge over Church Run, Bridge
     3             Replacement                                   360,000
     4         (10)  Rockdale Township, T-878, Swamp
     5             Bridge, Bridge Replacement                    360,000
     6         (11)  Vernon Township, T-487, Middle Road
     7             Bridge over Watson Run, Bridge
     8             Replacement                                   400,000
     9             (Base Construction Allocation -
    10             $360,000)
    11             (Design and Contingencies - $40,000)
    12     (b)  State Bridges
    13         (1)  SR 0006, SR 0006 over Padan Creek,
    14             Conneaut Township, Bridge Replacement       1,004,000
    15             (Base Construction Allocation -
    16             $784,000)
    17             (Land Allocation - $20,000)
    18             (Design and Contingencies - $200,000)
    19         (2)  SR 0006, SR 0006 over French Creek,
    20             Woodcock Township, Bridge Replacement       2,325,000
    21             (Base Construction Allocation -
    22             $1,840,000)
    23             (Land Allocation - $20,000)
    24             (Design and Contingencies - $465,000)
    25         (3)  SR 0079, SR 0079 under Maple Drive,
    26             Hayfield Township, Bridge Replacement       2,401,000
    27             (Base Construction Allocation -
    28             $1,901,000)
    29             (Land Allocation - $20,000)
    30             (Design and Contingencies - $480,000)
    19990S0504B1471                 - 256 -

     1         (4)  SR 0089, SR 0089 over Shirley Run,
     2             Rome Township, Bridge Replacement             510,000
     3             (Base Construction Allocation -
     4             $420,000)
     5             (Land Allocation - $20,000)
     6             (Design and Contingencies - $70,000)
     7         (5)  SR 0098, SR 0098 over Van Horne Run,
     8             Vernon Township, Bridge Replacement           320,000
     9             (Base Construction Allocation -
    10             $260,000)
    11             (Land Allocation - $10,000)
    12             (Design and Contingencies - $50,000)
    13         (6)  SR 0099, SR 0099 over Little
    14             Conneauttee Creek, Cambridge Township,
    15             Bridge Replacement                            950,000
    16             (Base Construction Allocation -
    17             $700,000)
    18             (Land Allocation - $50,000)
    19             (Design and Contingencies - $200,000)
    20         (7)  SR 0099, SR 0099 over Conneaut Creek,
    21             Cambridge Township, Bridge Replacement        600,000
    22             (Base Construction Allocation -
    23             $500,000)
    24             (Land Allocation - $30,000)
    25             (Design and Contingencies - $70,000)
    26         (8)  SR 0198, SR 0198 over Carr Run,
    27             Woodcock Township, Bridge Replacement         260,000
    28             (Base Construction Allocation -
    29             $200,000)
    30             (Land Allocation - $20,000)
    19990S0504B1471                 - 257 -

     1             (Design and Contingencies - $40,000)
     2         (9)  SR 0285, SR 0285 over Bennett Run,
     3             North Shenango Township, Bridge
     4             Replacement                                   750,000
     5             (Base Construction Allocation -
     6             $650,000)
     7             (Land Allocation - $20,000)
     8             (Design and Contingencies - $80,000)
     9         (10)  SR 1002, SR 1002 over Acker Run,
    10             Venango Township, Bridge Replacement          370,000
    11             (Base Construction Allocation -
    12             $300,000)
    13             (Land Allocation - $20,000)
    14             (Design and Contingencies - $50,000)
    15         (11)  SR 1024, SR 1024 over Britton Run,
    16             Sparta Township, Bridge Replacement           340,000
    17             (Base Construction Allocation -
    18             $250,000)
    19             (Land Allocation - $20,000)
    20             (Design and Contingencies - $70,000)
    21         (12)  SR 2005, SR 2005 over French Creek,
    22             East Fairfield Township, Bridge
    23             Replacement                                 1,300,000
    24             (Base Construction Allocation -
    25             $1,130,000)
    26             (Land Allocation - $20,000)
    27             (Design and Contingencies - $150,000)
    28         (13)  SR 2010, SR 2010 over Little Sugar
    29             Creek, Wayne Township, Bridge
    30             Replacement                                   260,000
    19990S0504B1471                 - 258 -

     1             (Base Construction Allocation -
     2             $200,000)
     3             (Land Allocation - $20,000)
     4             (Design and Contingencies - $40,000)
     5         (14)  SR 3016, SR 3016 over B&LE Railroad,
     6             Summit Township, Bridge Replacement         1,150,000
     7             (Base Construction Allocation -
     8             $1,000,000)
     9             (Land Allocation - $30,000)
    10             (Design and Contingencies - $120,000)
    11         (15)  SR 0018, SR 0018 Bridge over
    12             Tributary of Conneaut Creek, Summit
    13             Township, Bridge Rehabilitation               115,000
    14             (Base Construction Allocation -
    15             $100,000)
    16             (Design and Contingencies - $15,000)
    17         (16)  SR 0098, SR 0098 Bridge over
    18             Tributary of Cussewago Creek, Hayfield
    19             Township, Bridge Rehabilitation               110,000
    20             (Base Construction Allocation -
    21             $100,000)
    22             (Design and Contingencies - $10,000)
    23         (17)  SR 2003, Mercer Pike Bridge over
    24             Conneaut Creek Outlet, Union Township,
    25             Bridge Replacement                            600,000
    26             (Base Construction Allocation -
    27             $520,000)
    28             (Land Allocation - $30,000)
    29             (Design and Contingencies - $50,000)
    30         (18)  SR 0006, Bridge over French Creek,
    19990S0504B1471                 - 259 -

     1             Woodcock Township, Bridge Painting            590,000
     2             (Base Construction Allocation -
     3             $500,000)
     4             (Land Allocation - $10,000)
     5             (Design and Contingencies - $80,000)
     6         (19)  SR 0408, Mohawk Run Bridge over
     7             Mohawk Run, Rockdale Township, Bridge
     8             Replacement                                   262,000
     9             (Base Construction Allocation -
    10             $189,000)
    11             (Land Allocation - $20,000)
    12             (Design and Contingencies - $53,000)
    13         (20)  SR 1020, Tryonville Road Bridge over
    14             Oil Creek, Steuben Township, Bridge
    15             Replacement                                   960,000
    16             (Base Construction Allocation -
    17             $840,000)
    18             (Land Allocation - $20,000)
    19             (Design and Contingencies - $100,000)
    20         (21)  SR 1035, Brown Hill Road Bridge over
    21             Muddy Creek Tributary, Rockdale
    22             Township, Bridge Rehabilitation               194,000
    23             (Base Construction Allocation -
    24             $135,000)
    25             (Land Allocation - $20,000)
    26             (Design and Contingencies - $39,000)
    27         (22)  SR 4010, West Road Bridge over
    28             Cussewago Creek, Cussewago Township,
    29             Bridge Painting                               480,000
    30             (Base Construction Allocation -
    19990S0504B1471                 - 260 -

     1             $400,000)
     2             (Land Allocation - $20,000)
     3             (Design and Contingencies - $60,000)
     4         (23)  SR 0198, Bridge over Dickson Street,
     5             Randolph Township, Bridge
     6             Rehabilitation                                300,000
     7             (Base Construction Allocation -
     8             $220,000)
     9             (Land Allocation - $20,000)
    10             (Design and Contingencies - $60,000)
    11         (24)  SR 1008, Bridge over Brush Creek,
    12             Cussewago Township, Bridge
    13             Rehabilitation                                340,000
    14             (Base Construction Allocation -
    15             $260,000)
    16             (Land Allocation - $20,000)
    17             (Design and Contingencies - $60,000)
    18         (25)  SR 1008, Bridge over Boles Run,
    19             Cussewago Township, Bridge
    20             Rehabilitation                                340,000
    21             (Base Construction Allocation -
    22             $260,000)
    23             (Land Allocation - $20,000)
    24             (Design and Contingencies - $60,000)
    25         (26)  SR 3008, Bridge over Johnson Run,
    26             South Shenango Township, Bridge
    27             Rehabilitation                                440,000
    28             (Base Construction Allocation -
    29             $360,000)
    30             (Land Allocation - $20,000)
    19990S0504B1471                 - 261 -

     1             (Design and Contingencies - $60,000)
     2         (27)  SR 0008, Bridge over Franklin Street
     3             Mill Race, Titusville, Bridge
     4             Replacement                                   360,000
     5             (Base Construction Allocation -
     6             $300,000)
     7             (Land Allocation - $10,000)
     8             (Design and Contingencies - $50,000)
     9         (28)  SR 0027, Bridge No.2 over Oil Creek,
    10             Oil Creek Township, Bridge Replacement        200,000
    11             (Base Construction Allocation -
    12             $100,000)
    13             (Land Allocation - $20,000)
    14             (Design and Contingencies - $80,000)
    15         (29)  SR 0077, Bridge over Main Street,
    16             Spartansburg Borough, Bridge
    17             Replacement                                   600,000
    18             (Base Construction Allocation -
    19             $500,000)
    20             (Land Allocation - $20,000)
    21             (Design and Contingencies - $80,000)
    22         (30)  SR 0079, Bridge over T-528, Mercer
    23             Pike, Greenwood Township, Bridge
    24             Replacement                                 1,520,000
    25             (Base Construction Allocation -
    26             $1,300,000)
    27             (Land Allocation - $20,000)
    28             (Design and Contingencies - $200,000)
    29         (31)  SR 0079, Bridge over Rock Creek,
    30             Greenwood Township, Bridge Replacement        570,000
    19990S0504B1471                 - 262 -

     1             (Base Construction Allocation -
     2             $500,000)
     3             (Land Allocation - $20,000)
     4             (Design and Contingencies - $50,000)
     5         (32)  SR 0079, Northbound Bridge over
     6             Conneaut Swamp, Greenwood Township,
     7             Bridge Replacement                          4,050,000
     8             (Base Construction Allocation -
     9             $3,500,000)
    10             (Land Allocation - $50,000)
    11             (Design and Contingencies - $500,000)
    12         (33)  SR 0079, Southbound Bridge over
    13             Conneaut Swamp, Greenwood Township,
    14             Bridge Replacement                          4,050,000
    15             (Base Construction Allocation -
    16             $3,500,000)
    17             (Land Allocation - $50,000)
    18             (Design and Contingencies - $500,000)
    19         (34)  SR 0079, Bridge over T-391 Rung Road,
    20             Union Township, Bridge Replacement          1,120,000
    21             (Base Construction Allocation -
    22             $1,000,000)
    23             (Land Allocation - $20,000)
    24             (Design and Contingencies - $100,000)
    25         (35)  SR 0079, Bridge over T-433 and
    26             Conrail, Union Township, Bridge
    27             Replacement                                 2,120,000
    28             (Base Construction Allocation -
    29             $2,000,000)
    30             (Land Allocation - $20,000)
    19990S0504B1471                 - 263 -

     1             (Design and Contingencies - $100,000)
     2         (36)  SR 0079, Bridge over B&LE Railroad
     3             and Stream, Union Township, Bridge
     4             Replacement                                 3,220,000
     5             (Base Construction Allocation -
     6             $3,100,000)
     7             (Land Allocation - $20,000)
     8             (Design and Contingencies - $100,000)
     9         (37)  SR 0079, Bridge over Van Horne Run,
    10             Vernon Township, Bridge Replacement           370,000
    11             (Base Construction Allocation -
    12             $300,000)
    13             (Land Allocation - $20,000)
    14             (Design and Contingencies - $50,000)
    15         (38)  SR 0079, Bridge over US 6 and 322,
    16             Vernon Township, Bridge Replacement         3,630,000
    17             (Base Construction Allocation -
    18             $3,400,000)
    19             (Land Allocation - $30,000)
    20             (Design and Contingencies - $200,000)
    21         (39)  SR 0079, Bridge over US 6 and 322,
    22             Vernon Township, Bridge Replacement         3,230,000
    23             (Base Construction Allocation -
    24             $3,000,000)
    25             (Land Allocation - $30,000)
    26             (Design and Contingencies - $200,000)
    27         (40)  SR 0079, Bridge over Van Horne Run,
    28             Vernon Township, Bridge Rehabilitation      1,000,000
    29             (Base Construction Allocation -
    30             $880,000)
    19990S0504B1471                 - 264 -

     1             (Land Allocation - $20,000)
     2             (Design and Contingencies - $100,000)
     3         (41)  SR 0079, Bridge over SR 0102, Vernon
     4             Township, Bridge Replacement                1,120,000
     5             (Base Construction Allocation -
     6             $1,000,000)
     7             (Land Allocation - $20,000)
     8             (Design and Contingencies - $100,000)
     9         (42)  SR 0079, Bridge over SR 4011,
    10             Cussewago Township, Bridge Replacement        920,000
    11             (Base Construction Allocation -
    12             $800,000)
    13             (Land Allocation - $20,000)
    14             (Design and Contingencies - $100,000)
    15         (43)  SR 0089, Bridge over Hummer Creek,
    16             Oil Creek Township, Bridge Replacement        400,000
    17             (Base Construction Allocation -
    18             $300,000)
    19             (Land Allocation - $20,000)
    20             (Design and Contingencies - $80,000)
    21         (44)  SR 0173, Cochranton Truss Bridge,
    22             Fairfield Township, Bridge Replacement      3,100,000
    23             (Base Construction Allocation -
    24             $2,750,000)
    25             (Land Allocation - $50,000)
    26             (Design and Contingencies - $300,000)
    27         (45)  SR 0198, Bridge over Wolf Run,
    28             Hayfield Township, Bridge Replacement         400,000
    29             (Base Construction Allocation -
    30             $300,000)
    19990S0504B1471                 - 265 -

     1             (Land Allocation - $20,000)
     2             (Design and Contingencies - $80,000)
     3         (46)  SR 0285, Bridge over SR 0079
     4             Northbound and Southbound, Greenwood
     5             Township, Bridge Replacement                7,920,000
     6             (Base Construction Allocation -
     7             $7,100,000)
     8             (Land Allocation - $20,000)
     9             (Design and Contingencies - $800,000)
    10         (47)  SR 0285, Bridge over Town House Run,
    11             Fairfield Township, Bridge Replacement        300,000
    12             (Base Construction Allocation -
    13             $200,000)
    14             (Land Allocation - $20,000)
    15             (Design and Contingencies - $80,000)
    16         (48)  SR 1010, Bridge over Woodcock Creek,
    17             Richmond Township, Bridge Replacement         700,000
    18             (Base Construction Allocation -
    19             $600,000)
    20             (Land Allocation - $20,000)
    21             (Design and Contingencies - $80,000)
    22         (49)  SR 1013, Bridge over McLaughlin
    23             Creek, Oil Creek Township, Bridge
    24             Replacement                                   300,000
    25             (Base Construction Allocation -
    26             $200,000)
    27             (Land Allocation - $20,000)
    28             (Design and Contingencies - $80,000)
    29         (50)  SR 1015, Bridge over Hotchkiss Run,
    30             Cussewago Township, Bridge Replacement        200,000
    19990S0504B1471                 - 266 -

     1             (Base Construction Allocation -
     2             $100,000)
     3             (Land Allocation - $20,000)
     4             (Design and Contingencies - $80,000)
     5         (51)  SR 1033, Bridge over Muddy Creek,
     6             Richmond Township, Bridge Replacement       1,360,000
     7             (Base Construction Allocation -
     8             $1,200,000)
     9             (Land Allocation - $20,000)
    10             (Design and Contingencies - $140,000)
    11         (52)  SR 1035, Mackey Hill Road, Bridge
    12             over Mud Creek, Rockdale Township,
    13             Bridge Rehabilitation                         500,000
    14             (Base Construction Allocation -
    15             $420,000)
    16             (Land Allocation - $20,000)
    17             (Design and Contingencies - $60,000)
    18         (53)  SR 1037, Bridge over Little Federal
    19             Run, Athens Township, Bridge
    20             Replacement                                   300,000
    21             (Base Construction Allocation -
    22             $200,000)
    23             (Land Allocation - $20,000)
    24             (Design and Contingencies - $80,000)
    25         (54)  SR 1037, Bridge over Federal Run,
    26             Bloomfield Township, Bridge
    27             Replacement                                   200,000
    28             (Base Construction Allocation -
    29             $120,000)
    30             (Land Allocation - $20,000)
    19990S0504B1471                 - 267 -

     1             (Design and Contingencies - $60,000)
     2         (55)  SR 1039, Bridge over Mosey Run,
     3             Bloomfield Township, Bridge
     4             Replacement                                   500,000
     5             (Base Construction Allocation -
     6             $400,000)
     7             (Land Allocation - $20,000)
     8             (Design and Contingencies - $80,000)
     9         (56)  SR 2017, Bridge over Sugar Creek,
    10             Troy Township, Bridge Replacement             300,000
    11             (Base Construction Allocation -
    12             $200,000)
    13             (Land Allocation - $20,000)
    14             (Design and Contingencies - $80,000)
    15         (57)  SR 2018, Deckards Run Bridge No.1,
    16             Wayne Township, Bridge Replacement            400,000
    17             (Base Construction Allocation -
    18             $300,000)
    19             (Land Allocation - $20,000)
    20             (Design and Contingencies - $80,000)
    21         (58)  SR 2018, Deckards Run Bridge No.2,
    22             Wayne Township, Bridge Replacement            300,000
    23             (Base Construction Allocation -
    24             $200,000)
    25             (Land Allocation - $20,000)
    26             (Design and Contingencies - $80,000)
    27         (59)  SR 2019, Bridge over Sugar Creek East
    28             Branch, Troy Township, Bridge
    29             Replacement                                   120,000
    30             (Base Construction Allocation -
    19990S0504B1471                 - 268 -

     1             $50,000)
     2             (Land Allocation - $20,000)
     3             (Design and Contingencies - $50,000)
     4         (60)  SR 2028, Bridge over Caldwell Creek,
     5             Oil Creek Township, Bridge Replacement      1,700,000
     6             (Base Construction Allocation -
     7             $1,500,000)
     8             (Land Allocation - $20,000)
     9             (Design and Contingencies - $180,000)
    10         (61)  SR 3004, Bridge over Crooked Creek,
    11             East Fallowfield Township, Bridge
    12             Replacement                                   600,000
    13             (Base Construction Allocation -
    14             $500,000)
    15             (Land Allocation - $20,000)
    16             (Design and Contingencies - $80,000)
    17         (62)  SR 3005, Bridge over Bennett Run,
    18             North Shenango Township, Bridge
    19             Replacement                                   700,000
    20             (Base Construction Allocation -
    21             $600,000)
    22             (Land Allocation - $20,000)
    23             (Design and Contingencies - $80,000)
    24         (63)  SR 3011, Bridge over Pymatuning
    25             Reservoir, Pine Township, Bridge
    26             Replacement                                   500,000
    27             (Base Construction Allocation -
    28             $400,000)
    29             (Land Allocation - $20,000)
    30             (Design and Contingencies - $80,000)
    19990S0504B1471                 - 269 -

     1         (64)  SR 4001, Bridge over Padan Creek
     2             Tributary, Conneaut Township, Bridge
     3             Replacement                                   300,000
     4             (Base Construction Allocation -
     5             $200,000)
     6             (Land Allocation - $20,000)
     7             (Design and Contingencies - $80,000)
     8         (65)  SR 4001, Beaver Center Road Bridge
     9             No.1, Beaver Township, Bridge
    10             Replacement                                   600,000
    11             (Base Construction Allocation -
    12             $520,000)
    13             (Land Allocation - $20,000)
    14             (Design and Contingencies - $60,000)
    15         (66)  SR 4003, Bridge over Tributary of
    16             Conneaut Creek, Conneautville Borough,
    17             Bridge Replacement                            600,000
    18             (Base Construction Allocation -
    19             $500,000)
    20             (Land Allocation - $20,000)
    21             (Design and Contingencies - $80,000)
    22         (67)  SR 4004, Center Road Bridge No.1,
    23             Conneaut Township, Bridge Replacement         500,000
    24             (Base Construction Allocation -
    25             $400,000)
    26             (Land Allocation - $20,000)
    27             (Design and Contingencies - $80,000)
    28         (68)  SR 4004, Center Road Bridge No.2,
    29             Conneaut Township, Bridge Replacement         300,000
    30             (Base Construction Allocation -
    19990S0504B1471                 - 270 -

     1             $200,000)
     2             (Land Allocation - $20,000)
     3             (Design and Contingencies - $80,000)
     4         (69)  SR 4009, Bridge over I-79, Northbound
     5             and Southbound, Hayfield Township,
     6             Bridge Replacement                          4,820,000
     7             (Base Construction Allocation -
     8             $4,300,000)
     9             (Land Allocation - $20,000)
    10             (Design and Contingencies - $500,000)
    11         (70)  SR 4010, Bridge over East Branch of
    12             Conneaut Creek, Beaver Township, Bridge
    13             Replacement                                   200,000
    14             (Base Construction Allocation -
    15             $100,000)
    16             (Land Allocation - $20,000)
    17             (Design and Contingencies - $80,000)
    18         (71)  SR 4011, Bridge over Tributary of
    19             Wolf Run, Hayfield Township, Bridge
    20             Replacement                                   200,000
    21             (Base Construction Allocation -
    22             $100,000)
    23             (Land Allocation - $20,000)
    24             (Design and Contingencies - $80,000)
    25         (72)  SR 4016, Bridge over Bill Mack Run,
    26             Summerhill Township, Bridge
    27             Replacement                                   200,000
    28             (Base Construction Allocation -
    29             $100,000)
    30             (Land Allocation - $20,000)
    19990S0504B1471                 - 271 -

     1             (Design and Contingencies - $80,000)
     2         (73)  SR 0006, Bridge over French Creek,
     3             Cambridge Springs Borough, Bridge
     4             Replacement                                 1,620,000
     5             (Base Construction Allocation -
     6             $1,400,000)
     7             (Land Allocation - $20,000)
     8             (Design and Contingencies - $200,000)
     9         (74)  SR 0006, Bridge over Cusswago Street,
    10             Cambridge Township, Bridge Replacement        590,000
    11             (Base Construction Allocation -
    12             $500,000)
    13             (Land Allocation - $10,000)
    14             (Design and Contingencies - $80,000)
    15         (75)  SR 0008, Bridge over Franklin Street,
    16             Titusville City, Bridge Replacement         2,220,000
    17             (Base Construction Allocation -
    18             $2,000,000)
    19             (Land Allocation - $20,000)
    20             (Design and Contingencies - $200,000)
    21         (76)  SR 0006, Bridge over Smock Street,
    22             West Mead Township, Bridge Replacement     33,600,000
    23             (Base Construction Allocation -
    24             $30,000,000)
    25             (Land Allocation - $100,000)
    26             (Design and Contingencies - $3,500,000)
    27         (77)  SR 0006, French Creek Bridge No.3,
    28             Woodcock Township, Bridge Replacement       3,120,000
    29             (Base Construction Allocation -
    30             $2,800,000)
    19990S0504B1471                 - 272 -

     1             (Land Allocation - $20,000)
     2             (Design and Contingencies - $300,000)
     3         (78)  SR 0006, French Creek Bridge No.2,
     4             Woodcock Township, Bridge
     5             Rehabilitation                              9,320,000
     6             (Base Construction Allocation -
     7             $8,000,000)
     8             (Land Allocation - $20,000)
     9             (Design and Contingencies - $1,300,000)
    10         (79)  SR 0006, French Creek Bridge No.1,
    11             Woodcock Township, Bridge Replacement       3,330,000
    12             (Base Construction Allocation -
    13             $3,000,000)
    14             (Land Allocation - $20,000)
    15             (Design and Contingencies - $310,000)
    16  Section 25.  Cumberland County.
    17     (a)  Local Bridges
    18         (1)  Camp Hill Borough, Pedestrian Tunnel
    19             under Bypass at 24th Street, Bridge
    20             Replacement                                   500,000
    21         (2)  Camp Hill Borough, Pedestrian Tunnel
    22             under Bypass at 27th Street, Bridge
    23             Replacement                                   500,000
    24         (3)  Cumberland County, Wolf Bridge over
    25             Conodoquinet Creek, Bridge Replacement      1,920,000
    26             (Base Construction Allocation -
    27             $1,500,000)
    28             (Land Allocation - $20,000)
    29             (Design and Contingencies - $400,000)
    30         (4)  Cumberland and York Counties, Bridge
    19990S0504B1471                 - 273 -

     1             over Yellow Breeches Creek, Bridge
     2             Replacement                                 1,470,000
     3             (Base Construction Allocation -
     4             $1,100,000)
     5             (Land Allocation - $20,000)
     6             (Design and Contingencies - $350,000)
     7         (5)  Cumberland and York Counties, Bridge
     8             over Yellow Breeches Creek, Bridge
     9             Replacement                                 1,310,000
    10             (Base Construction Allocation -
    11             $950,000)
    12             (Land Allocation - $40,000)
    13             (Design and Contingencies - $320,000)
    14         (6)  Dickinson Township, T-542, Bridge over
    15             Yellow Breeches Creek, Bridge
    16             Replacement                                 1,366,000
    17             (Base Construction Allocation -
    18             $1,088,000)
    19             (Land Allocation - $55,000)
    20             (Design and Contingencies - $223,000)
    21         (7)  Lower Frankford Township, T-459,
    22             Bridge over Locust Creek, Bridge
    23             Rehabilitation                                 30,000
    24             (Base Construction Allocation -
    25             $25,000)
    26             (Design and Contingencies - $5,000)
    27         (8)  Lower Frankford Township, T-459,
    28             Bridge over Tributary of Opossum Creek,
    29             Bridge Rehabilitation                          10,000
    30             (Base Construction Allocation -
    19990S0504B1471                 - 274 -

     1             $10,000)
     2         (9)  Lower Frankford Township, T-459,
     3             Bridge over Opossum Creek, Bridge
     4             Rehabilitation                                  2,000
     5             (Base Construction Allocation - $2,000)
     6         (10)  Lower Mifflin Township, T-414, Bridge
     7             over Doubling Gap Creek, Bridge
     8             Replacement                                   175,000
     9             (Base Construction Allocation -
    10             $95,000)
    11             (Land Allocation - $5,000)
    12             (Design and Contingencies - $75,000)
    13         (11)  Mechanicsburg Borough, Mulberry
    14             Street Bridge over Trindle Spring Run,
    15             Bridge Replacement                            110,000
    16         (12)  Mechanicsburg Borough, T-591, Bridge
    17             over Trindle Spring Run, Bridge
    18             Replacement                                    80,000
    19         (13)  Mount Holly Springs Borough, East
    20             Pine Street Bridge over Mountain Creek,
    21             Bridge Replacement                          5,225,000
    22             (Base Construction Allocation -
    23             $5,000,000)
    24             (Land Allocation - $20,000)
    25             (Design and Contingencies - $205,000)
    26         (14)  Penn Township, T-343, Bridge over
    27             Yellow Breeches Creek, Bridge
    28             Replacement                                   218,000
    29             (Base Construction Allocation -
    30             $200,000)
    19990S0504B1471                 - 275 -

     1             (Design and Contingencies - $18,000)
     2         (15)  EAST PENNSBORO TOWNSHIP, BRIDGE M-8,                 <--
     3             MAGARO ROAD OVER CONODOGUINET CREEK,
     4             BRIDGE REPLACEMENT                            360,000
     5     (b)  State Bridges
     6         (1)  SR 1001, Cavalry Road Bridge over
     7             Turnpike, North Middleton Township,
     8             Bridge Replacement                          2,650,000
     9             (Base Construction Allocation -
    10             $2,300,000)
    11             (Land Allocation - $50,000)
    12             (Design and Contingencies - $300,000)
    13         (2)  SR 0015, US 15 Bridges from Zimmerman
    14             Drive to PA 581, Lower Allen Township
    15             and East Pennsboro Township, New Bridge
    16             Construction                               11,610,000
    17             (Base Construction Allocation -
    18             $10,422,000)
    19             (Land Allocation - $100,000)
    20             (Design and Contingencies - $1,088,000)
    21         (3)  PA 34, Bridge over Conodoquinet Creek,
    22             North Middleton Township, Bridge
    23             Replacement                                 2,030,000
    24             (Base Construction Allocation -
    25             $1,504,000)
    26             (Land Allocation - $150,000)
    27             (Design and Contingencies - $376,000)
    28         (4)  SR 4007, Bridge over Conodoquinet
    29             Creek, North Newton Township, Bridge
    30             Replacement                                   873,000
    19990S0504B1471                 - 276 -

     1             (Base Construction Allocation -
     2             $646,000)
     3             (Land Allocation - $162,000)
     4             (Design and Contingencies - $65,000)
     5         (5)  SR 3007, Bridge over Big Spring Run,
     6             West Pennsboro Township, Bridge
     7             Replacement                                   476,000
     8             (Base Construction Allocation -
     9             $353,000)
    10             (Land Allocation - $35,000)
    11             (Design and Contingencies - $88,000)
    12         (6)  SR 3008, Bridge over Tagg Run,
    13             Dickinson Township, Bridge Replacement        462,000
    14             (Base Construction Allocation -
    15             $343,000)
    16             (Land Allocation - $34,000)
    17             (Design and Contingencies - $85,000)
    18         (7)  US 11, Bridge over Alexander Spring,
    19             Dickinson Township, Bridge Replacement        431,000
    20             (Base Construction Allocation -
    21             $319,000)
    22             (Land Allocation - $32,000)
    23             (Design and Contingencies - $80,000)
    24         (8)  PA 997, Bridge over Doubling Gap Run,
    25             Lower Mifflin Township, Bridge
    26             Replacement                                   784,000
    27             (Base Construction Allocation -
    28             $581,000)
    29             (Land Allocation - $58,000)
    30             (Design and Contingencies - $145,000)
    19990S0504B1471                 - 277 -

     1         (9)  Various Bridges, Preventive
     2             Maintenance                                   382,000
     3  Section 26.  Dauphin County.
     4     (a)  Local Bridges
     5         (1)  City of Harrisburg, Mulberry Street
     6             Ramp to Cameron Street, Bridge
     7             Rehabilitation                                108,000
     8             (Base Construction Allocation -
     9             $73,000)
    10             (Land Allocation - $10,000)
    11             (Design and Contingencies - $ 25,000)
    12         (2)  City of Harrisburg, Maclay Street
    13             Bridge over Railroad, Bridge
    14             Rehabilitation                                218,000
    15             (Base Construction Allocation -
    16             $183,000)
    17             (Land Allocation - $10,000)
    18             (Design and Contingencies - $25,000)
    19         (3)  Mifflin Township, T-631, Reitz Road
    20             Bridge over Little Wiconisco Creek,
    21             County Bridge No.24, Bridge
    22             Replacement                                   290,000
    23             (Base Construction Allocation -
    24             $200,000)
    25             (Land Allocation - $10,000)
    26             (Design and Contingencies - $80,000)
    27         (4)  Mifflin Township, T-556, Kessler Road
    28             Bridge over Little Wiconisco Creek,
    29             Bridge Replacement                            235,000
    30             (Base Construction Allocation -
    19990S0504B1471                 - 278 -

     1             $150,000)
     2             (Land Allocation - $10,000)
     3             (Design and Contingencies - $75,000)
     4         (5)  Washington Township, Bolts Road Bridge
     5             over Wiconisco Creek, Bridge
     6             Rehabilitation                                469,000
     7             (Base Construction Allocation -
     8             $374,000)
     9             (Land Allocation - $10,000)
    10             (Design and Contingencies - $85,000)
    11         (6)  Wayne Township, T-496, Lebo Road
    12             Bridge over Powell Creek, Bridge
    13             Rehabilitation                                263,000
    14             (Base Construction Allocation -
    15             $168,000)
    16             (Land Allocation - $10,000)
    17             (Design and Contingencies - $85,000)
    18         (7)  Conewago Township, T-602 and T-749
    19             over Conewago Creek, Bridge
    20             Replacement                                   722,000
    21             (Base Construction Allocation -
    22             $556,000)
    23             (Land Allocation - $10,000)
    24             (Design and Contingencies - $156,000)
    25         (8)  Halifax Township, T-454 over Armstrong
    26             Creek, Bridge Replacement                     480,000
    27             (Base Construction Allocation -
    28             $367,000)
    29             (Land Allocation - $10,000)
    30             (Design and Contingencies - $103,000)
    19990S0504B1471                 - 279 -

     1         (9)  Jackson Township, T-544 over Armstrong
     2             Creek, Bridge Replacement                     379,000
     3             (Base Construction Allocation -
     4             $288,000)
     5             (Land Allocation - $10,000)
     6             (Design and Contingencies - $81,000)
     7         (10)  Jefferson Township, T-534 over Powell
     8             Creek, Bridge Replacement                     397,000
     9             (Base Construction Allocation -
    10             $302,000)
    11             (Land Allocation - $10,000)
    12             (Design and Contingencies - $85,000)
    13         (11)  Upper Paxton Township, T-460 over
    14             Wiconisco Creek, Bridge Replacement           427,000
    15             (Base Construction Allocation -
    16             $326,000)
    17             (Land Allocation - $10,000)
    18             (Design and Contingencies - $91,000)
    19         (12)  Washington Township, T-595 over
    20             Wiconisco Creek, Bridge Replacement           669,000
    21             (Base Construction Allocation -
    22             $515,000)
    23             (Land Allocation - $10,000)
    24             (Design and Contingencies - $144,000)
    25         (13)  Washington Township, T-462 over
    26             Wiconisco Creek, Bridge Replacement           668,000
    27             (Base Construction Allocation -
    28             $514,000)
    29             (Land Allocation - $10,000)
    30             (Design and Contingencies - $144,000)
    19990S0504B1471                 - 280 -

     1         (14)  Wayne Township, T-448 over Powell
     2             Creek, Bridge Replacement                     438,000
     3             (Base Construction Allocation -
     4             $334,000)
     5             (Land Allocation - $10,000)
     6             (Design and Contingencies - $94,000)
     7         (15)  Susquehanna Township, Interstate
     8             Drive Bridge over Paxton Creek, Bridge
     9             Replacement                                 1,118,000
    10             (Base Construction Allocation -
    11             $818,000)
    12             (Land Allocation - $100,000)
    13             (Design and Contingencies - $200,000)
    14     (b)  State Bridges
    15         (1)  SR 0039, Bridge over I-81, West
    16             Hanover Township, Bridge
    17             Reconstruction                              3,400,000
    18             (Base Construction Allocation -
    19             $3,200,000)
    20             (Design and Contingencies - $200,000)
    21         (2)  SR 0743, Spring Creek Bridge over
    22             Spring Creek, Derry Township, Bridge
    23             Replacement                                 1,760,000
    24             (Base Construction Allocation -
    25             $1,500,000)
    26             (Land Allocation - $10,000)
    27             (Design and Contingencies - $250,000)
    28         (3)  SR 0743, Conrail Bridge over Conrail,
    29             Derry Township, Bridge Replacement          1,760,000
    30             (Base Construction Allocation -
    19990S0504B1471                 - 281 -

     1             $1,500,000)
     2             (Land Allocation - $10,000)
     3             (Design and Contingencies - $250,000)
     4         (4)  SR 3015, North Progress Avenue Bridge
     5             over Paxton Creek, Susquehanna
     6             Township, Bridge Rehabilitation               509,000
     7             (Base Construction Allocation -
     8             $409,000)
     9             (Land Allocation - $20,000)
    10             (Design and Contingencies - $80,000)
    11         (5)  SR 3012, Market Street Bridge over
    12             Susquehanna River, City of Harrisburg,
    13             Lighting Improvements                         120,000
    14             (Base Construction Allocation -
    15             $100,000)
    16             (Land Allocation - $5,000)
    17             (Design and Contingencies - $15,000)
    18         (6)  SR 2019, Nyes Road Bridge over
    19             Tributary of Beaver Creek, Lower Paxton
    20             Township, Bridge Restoration                  800,000
    21             (Base Construction Allocation -
    22             $640,000)
    23             (Land Allocation - $10,000)
    24             (Design and Contingencies - $150,000)
    25         (7)  SR 2017, Bridge over Manada Creek,
    26             East Hanover Township, Bridge
    27             Replacement                                 1,115,000
    28             (Base Construction Allocation -
    29             $825,000)
    30             (Land Allocation - $83,000)
    19990S0504B1471                 - 282 -

     1             (Design and Contingencies - $207,000)
     2         (8)  SR 2011, Bridge over Branch of Spring
     3             Run, Derry Township, Bridge
     4             Replacement                                   363,000
     5             (Base Construction Allocation -
     6             $269,000)
     7             (Land Allocation - $27,000)
     8             (Design and Contingencies - $67,000)
     9         (9)  PA 441, Bridge over Swatara Creek,
    10             Royalton Borough, Bridge
    11             Rehabilitation                              3,520,000
    12             (Base Construction Allocation -
    13             $2,718,000)
    14             (Land Allocation - $150,000)
    15             (Design and Contingencies - $652,000)
    16         (10)  SR 3012, Bridge over Susquehanna
    17             River, City of Harrisburg, Bridge
    18             Rehabilitation                                600,000
    19             (Base Construction Allocation -
    20             $525,000)
    21             (Design and Contingencies - $75,000)
    22         (11)  US 422 Bridge over US 322, Derry
    23             Township, Bridge Rehabilitation             3,400,000
    24             (Base Construction Allocation -
    25             $2,956,000)
    26             (Design and Contingencies - $444,000)
    27         (12)  T-390 over US 322, Derry Township,
    28             Bridge Rehabilitation                         437,000
    29             (Base Construction Allocation -
    30             $324,000)
    19990S0504B1471                 - 283 -

     1             (Land Allocation - $32,000)
     2             (Design and Contingencies - $81,000)
     3         (13)  SR 2017, Manada Bottom Bridge No.2
     4             over Manada Creek, East Hanover
     5             Township, Bridge Replacement                  220,000
     6             (Base Construction Allocation -
     7             $150,000)
     8             (Land Allocation - $10,000)
     9             (Design and Contingencies - $60,000)
    10         (14)  SR 3034, Walnut Street Pedestrian
    11             Bridge over Susquehanna River, City of
    12             Harrisburg, West Portion, Bridge
    13             Replacement                                10,205,000
    14         (15)  SR 4008, Little Wiconisco Creek
    15             Bridge over Little Wiconisco Creek,
    16             Upper Paxton Township, Bridge
    17             Replacement                                   191,000
    18             (Base Construction Allocation -
    19             $120,000)
    20             (Land Allocation - $10,000)
    21             (Design and Contingencies - $61,000)
    22         (16)  Various Bridges, Preventive
    23             Maintenance                                   382,000
    24  Section 27.  Delaware County.
    25     (a)  Local Bridges
    26         (1)  City of Chester, West 7th Street,
    27             County Bridge No.186 over Chester
    28             Creek, Bridge Replacement                   1,630,000
    29             (Base Construction Allocation -
    30             $1,470,000)
    19990S0504B1471                 - 284 -

     1             (Land Allocation - $10,000)
     2             (Design and Contingencies - $150,000)
     3         (2)  Thornbury Township, Locksley Road
     4             Bridge over Chester Creek, Bridge
     5             Replacement                                 1,850,000
     6             (Base Construction Allocation -
     7             $1,565,000)
     8             (Land Allocation - $20,000)
     9             (Design and Contingencies - $265,000)
    10         (3)  Aston Township, New Road over Chester
    11             Creek, Bridge Rehabilitation                1,530,000
    12             (Base Construction Allocation -
    13             $1,130,000)
    14             (Land Allocation - $30,000)
    15             (Design and Contingencies - $370,000)
    16         (4)  Upper Providence Township, Third
    17             Street Dam Bridge over Broomalls Run,
    18             Bridge Replacement                            885,000
    19     (b)  State Bridges
    20         (1)  SR 0030, Pedestrian Tunnel under SR
    21             0030 and Ithan Avenue at Villanova
    22             University, Radnor Township, Pedestrian
    23             Facilities                                  7,360,000
    24             (Base Construction Allocation -
    25             $6,500,000)
    26             (Land Allocation - $650,000)
    27             (Design and Contingencies - $210,000)
    28         (2)  SR 1015, Darby-Paoli Road Bridge over
    29             Branch of Little Darby Creek, Radnor
    30             Township, Bridge Replacement                1,000,000
    19990S0504B1471                 - 285 -

     1             (Base Construction Allocation -
     2             $760,000)
     3             (Land Allocation - $40,000)
     4             (Design and Contingencies - $200,000)
     5         (3)  SR 0291, 4th Street Bridge over Ridley
     6             Creek, Chester Township, Bridge
     7             Painting                                      291,000
     8             (Base Construction Allocation -
     9             $253,000)
    10             (Design and Contingencies - $38,000)
    11         (4)  SR 0291, Essington Avenue Bridge over
    12             Darby Creek, Ridley Township, Bridge
    13             Painting                                      546,000
    14             (Base Construction Allocation -
    15             $487,000)
    16             (Design and Contingencies - $59,000)
    17         (5)  SR 1019, Conestoga Road Bridge over
    18             PennDOT Railroad Right-of-Way, Radnor
    19             Township, Bridge Removal                      125,000
    20             (Base Construction Allocation -
    21             $100,000)
    22             (Land Allocation - $10,000)
    23             (Design and Contingencies - $15,000)
    24         (6)  SR 3019, Rosevally Road Bridge over
    25             SEPTA, Upper Providence Township,
    26             Bridge Replacement                            875,000
    27             (Base Construction Allocation -
    28             $700,000)
    29             (Land Allocation - $100,000)
    30             (Design and Contingencies - $75,000)
    19990S0504B1471                 - 286 -

     1         (7)  SR 0095, I-95 Bridge over Chester
     2             Creek, City of Chester, Bridge
     3             Replacement                                 5,100,000
     4             (Base Construction Allocation -
     5             $5,000,000)
     6             (Design and Contingencies - $100,000)
     7         (8)  SR 2037, Hanser Bridge on Crum Creek
     8             Road over Crum Creek, Marple Township
     9             and Upper Providence Township, Bridge
    10             Replacement                                   663,000
    11  Section 28.  Elk County.
    12     (a)  Local Bridges
    13         (1)  Village of Wilcox, T-631, Bridge over
    14             Clarion River, Bridge Replacement           1,100,000
    15             (Base Construction Allocation -
    16             $850,000)
    17             (Land Allocation - $50,000)
    18             (Design and Contingencies - $200,000)
    19         (2)  Jones Township, T-671, Bridge over
    20             West Branch of Clarion River, Bridge
    21             Replacement                                 1,100,000
    22             (Base Construction Allocation -
    23             $850,000)
    24             (Land Allocation - $50,000)
    25             (Design and Contingencies - $200,000)
    26         (3)  JAY TOWNSHIP, T-417, SPRING RUN ROAD                  <--
    27             BRIDGE OVER SPRING RUN, BRIDGE
    28             REPLACEMENT                                   210,000
    29             (BASE CONSTRUCTION ALLOCATION -
    30             $150,000)
    19990S0504B1471                 - 287 -

     1             (LAND ALLOCATION - $10,000)
     2             (DESIGN AND CONTINGENCIES - $50,000)
     3     (b)  State Bridges
     4         (1)  SR 0555, Dixon Run Bridge, Village of
     5             Caledonia, Jay Township, Bridge
     6             Replacement                                    90,000
     7             (Base Construction Allocation -
     8             $60,000)
     9             (Land Allocation - $10,000)
    10             (Design and Contingencies - $20,000)
    11         (2)  SR 0949, Conrail Bridge over Conrail,
    12             Spring Creek Township, Bridge Painting        340,000
    13             (Base Construction Allocation -
    14             $330,000)
    15             (Design and Contingencies - $10,000)
    16         (3)  SR 1004, Crooked Creek Bridge over
    17             Crooked Creek, Jones Township, Bridge
    18             Painting                                       50,000
    19             (Base Construction Allocation -
    20             $45,000)
    21             (Design and Contingencies - $5,000)
    22         (4)  SR 3001, Belltown Bridge over Clarion
    23             River, Heath Township and Millstone
    24             Township, Bridge Painting                     420,000
    25             (Base Construction Allocation -
    26             $415,000)
    27             (Design and Contingencies - $5,000)
    28         (5)  SR 3002, Spring Creek Bridge over
    29             Spring Creek, Spring Creek Township,
    30             Bridge Painting                               160,000
    19990S0504B1471                 - 288 -

     1             (Base Construction Allocation -
     2             $155,000)
     3             (Design and Contingencies - $5,000)
     4  Section 29.  Erie County.
     5     (a)  Local Bridges
     6         (1)  Girard Township, Beckman Bridge over
     7             I-90, Bridge Painting                         200,000
     8             (Base Construction Allocation -
     9             $200,000)
    10         (2)  Millcreek Township, T-707, Zimmerly                   <--
    11             Road Bridge over I-79, New 2-Lane
    12             Bridge Construction, New Bridge             2,150,000
    13             (Base Construction Allocation -
    14             $1,900,000)
    15             (Land Allocation - $50,000)
    16             (Design and Contingencies - $200,000)
    17         (3)  City of Erie, Norman Way, Bridge over
    18             Millcreek, Bridge Rehabilitation              225,000
    19             (Base Construction Allocation -
    20             $200,000)
    21             (Design and Contingencies - $25,000)
    22         (4)  City of Erie, McBride Viaduct-East
    23             Avenue, Bridge over Railroad Lines,
    24             Bridge Rehabilitation                       1,340,000
    25             (Base Construction Allocation -
    26             $1,300,000)
    27             (Design and Contingencies - $40,000)
    28         (5)  City of Erie, Kahkwa Bridge over
    29             Ravine Drive, Bridge Rehabilitation            60,000
    30             (Base Construction Allocation -
    19990S0504B1471                 - 289 -

     1             $50,000)
     2             (Design and Contingencies - $10,000)
     3         (6)  Greenfield Township, T-974, Old Route
     4             89 Bridge over West Branch of French
     5             Creek Tributary, Bridge Replacement           350,000
     6             (Base Construction Allocation -
     7             $300,000)
     8             (Land Allocation - $10,000)
     9             (Design and Contingencies - $40,000)
    10         (7)  Franklin Township, T-424, Bridge No.1
    11             over Falk Run, Bridge Replacement             350,000
    12             (Base Construction Allocation -
    13             $300,000)
    14             (Land Allocation - $10,000)
    15             (Design and Contingencies - $40,000)
    16         (8)  Franklin Township, T-424, Bridge No.2
    17             over Falk Run, Bridge Replacement             350,000
    18             (Base Construction Allocation -
    19             $300,000)
    20             (Land Allocation - $10,000)
    21             (Design and Contingencies - $40,000)
    22         (9)  Millcreek Township, T-707, Zimmerly
    23             Road Bridge over I-79, Two-Lane Bridge
    24             Construction                                2,150,000
    25             (Base Construction Allocation -
    26             $1,900,000)
    27             (Land Allocation - $50,000)
    28             (Design and Contingencies - $200,000)
    29         (2)  CITY OF ERIE, NORMAN WAY, BRIDGE OVER                 <--
    30             MILL CREEK, BRIDGE REPLACEMENT                360,000
    19990S0504B1471                 - 290 -

     1             (BASE CONSTRUCTION ALLOCATION -
     2             $300,000)
     3             (LAND ALLOCATION - $20,000)
     4             (DESIGN AND CONTINGENCIES - $40,000)
     5         (3)  CITY OF ERIE, MCBRIDE VIADUCT-EAST
     6             AVENUE, BRIDGE OVER RAILROAD LINES,
     7             BRIDGE REHABILITATION                       1,360,000
     8             (BASE CONSTRUCTION ALLOCATION -
     9             $1,300,000)
    10             (LAND ALLOCATION - $20,000)
    11             (DESIGN AND CONTINGENCIES - $40,000)
    12         (4)  CITY OF ERIE, KAHKWA AVENUE BRIDGE
    13             OVER RAVINE DRIVE, BRIDGE
    14             REHABILITATION                                125,000
    15             (BASE CONSTRUCTION ALLOCATION -
    16             $100,000)
    17             (LAND ALLOCATION - $5,000)
    18             (DESIGN AND CONTINGENCIES - $20,000)
    19         (5)  GREENFIELD TOWNSHIP, T-974, OLD ROUTE
    20             89 BRIDGE OVER TRIBUTARY OF FRENCH
    21             CREEK, BRIDGE REPLACEMENT                     360,000
    22             (BASE CONSTRUCTION ALLOCATION -
    23             $300,000)
    24             (LAND ALLOCATION - $20,000)
    25             (DESIGN AND CONTINGENCIES - $40,000)
    26         (6)  MILLCREEK TOWNSHIP, T-707, ZIMMERLY
    27             ROAD BRIDGE OVER I-79, NEW BRIDGE
    28             CONSTRUCTION                                4,550,000
    29             (BASE CONSTRUCTION ALLOCATION -
    30             $3,500,000)
    19990S0504B1471                 - 291 -

     1             (LAND ALLOCATION - $400,000)
     2             (DESIGN AND CONTINGENCIES - $650,000)
     3         (10) (7)  Waterford Township, T-455,                       <--
     4             Sedgwick Road Bridge over Tributary of
     5             Lake Le Boeuf, Bridge Replacement             350,000
     6             (Base Construction Allocation -
     7             $300,000)
     8             (Land Allocation - $10,000)
     9             (Design and Contingencies - $40,000)
    10         (11) (8)  City of Erie, Pittsburgh Avenue                  <--
    11             over Conrail and NS Lines, New Bridge      11,000,000
    12             (Base Construction Allocation -
    13             $10,000,000)
    14             (Land Allocation - $250,000)
    15             (Design and Contingencies - $750,000)
    16         (12) (9)  City of Erie, Greengarden                        <--
    17             Boulevard over Conrail and NS Lines,
    18             New Construction                           11,000,000
    19             (Base Construction Allocation -
    20             $10,000,000)
    21             (Land Allocation - $250,000)
    22             (Design and Contingencies - $750,000)
    23         (13) (10)  Franklin Township, Falls Road                   <--
    24             over Falk Run Bridge No.2, Bridge
    25             Rehabilitation                                360,000
    26             (Base Construction Allocation -
    27             $300,000)
    28             (Land Allocation - $20,000)
    29             (Design and Contingencies - $40,000)
    30         (14) (11)  Franklin Township, Falls Road                   <--
    19990S0504B1471                 - 292 -

     1             over Falk Run Bridge No.1, Bridge
     2             Replacement                                   360,000
     3             (Base Construction Allocation -
     4             $300,000)
     5             (Land Allocation - $20,000)
     6             (Design and Contingencies - $40,000)
     7         (15) (12)  McKean Township, Oliver Road                    <--
     8             over Falk Run Bridge No.2, TRIBUTARY OF                <--
     9             ELK CREEK, Bridge Replacement                 150,000
    10             (Base Construction Allocation -
    11             $125,000)
    12             (Land Allocation - $5,000)
    13             (Design and Contingencies - $20,000)
    14         (16) (13)  Waterford Township, Sedgwick                    <--
    15             Road over Tributary of Lake LeBoeuf,
    16             Bridge Replacement                            370,000
    17             (Base Construction Allocation -
    18             $300,000)
    19             (Land Allocation - $20,000)
    20             (Design and Contingencies - $50,000)
    21     (b)  State Bridges
    22         (1)  SR 0005, SR 0005 over Scott Run,
    23             Harborcreek Township, Bridge
    24             Replacement                                   140,000
    25             (Base Construction Allocation -
    26             $100,000)
    27             (Land Allocation - $10,000)
    28             (Design and Contingencies - $30,000)
    29         (2)  SR 0006, SR 0006 over French Creek, Le
    30             Boeuf Township, Bridge Replacement            700,000
    19990S0504B1471                 - 293 -

     1             (Base Construction Allocation -
     2             $600,000)
     3             (Land Allocation - $20,000)
     4             (Design and Contingencies - $80,000)
     5         (3)  SR 0019, SR 0019 over LeBoeuf Creek,
     6             Waterford Township, Bridge Replacement        950,000
     7             (Base Construction Allocation -
     8             $840,000)
     9             (Land Allocation - $30,000)
    10             (Design and Contingencies - $80,000)
    11         (4)  SR 0020, SR 0020 over I-79, City of
    12             Erie, Bridge Replacement                    2,000,000
    13             (Base Construction Allocation -
    14             $1,770,000)
    15             (Land Allocation - $30,000)
    16             (Design and Contingencies - $200,000)
    17         (5)  SR 0089, SR 0089 over Sixteen Mile
    18             Creek, North East Township, Bridge
    19             Replacement                                   490,000
    20             (Base Construction Allocation -
    21             $400,000)
    22             (Land Allocation - $20,000)
    23             (Design and Contingencies - $70,000)
    24         (6)  SR 0090, SR 0090 over Crooked Creek,
    25             Girard Township, Bridge Replacement         1,420,000
    26             (Base Construction Allocation -
    27             $1,330,000)
    28             (Land Allocation - $30,000)
    29             (Design and Contingencies - $60,000)
    30         (7)  SR 0090, SR 0090 under Cherry Street,
    19990S0504B1471                 - 294 -

     1             Summit Township, Bridge Replacement         1,600,000
     2             (Base Construction Allocation -
     3             $1,410,000)
     4             (Land Allocation - $40,000)
     5             (Design and Contingencies - $150,000)
     6         (8)  SR 0090, SR 0090 under Clark Road,
     7             Harborcreek Township, Bridge
     8             Replacement                                 2,100,000
     9             (Base Construction Allocation -
    10             $1,880,000)
    11             (Land Allocation - $40,000)
    12             (Design and Contingencies - $180,000)
    13         (9)  SR 0098, SR 0098 over Cussewago Creek,
    14             Elk Creek Township, Bridge Replacement        400,000
    15             (Base Construction Allocation -
    16             $300,000)
    17             (Land Allocation - $20,000)
    18             (Design and Contingencies - $80,000)
    19         (10)  SR 0474, SR 0474 over Dean Run,
    20             Venango Township, Bridge Replacement          200,000
    21             (Base Construction Allocation -
    22             $160,000)
    23             (Land Allocation - $10,000)
    24             (Design and Contingencies - $30,000)
    25         (11)  SR 1001, SR 1001 over Conrail,
    26             Millcreek Township, Bridge Replacement        720,000
    27             (Base Construction Allocation -
    28             $600,000)
    29             (Land Allocation - $20,000)
    30             (Design and Contingencies - $100,000)
    19990S0504B1471                 - 295 -

     1         (12)  SR 1011, SR 1011 over Alder Brook,
     2             Venango Township, Bridge Replacement          470,000
     3             (Base Construction Allocation -
     4             $400,000)
     5             (Land Allocation - $10,000)
     6             (Design and Contingencies - $60,000)
     7         (13)  SR 1013, SR 1013 over I-90, North
     8             East Township, Bridge Replacement           1,220,000
     9             (Base Construction Allocation -
    10             $1,100,000)
    11             (Land Allocation - $20,000)
    12             (Design and Contingencies - $100,000)
    13         (14)  SR 3001, SR 3001 over Conneaut Creek,
    14             Conneaut Township, Bridge Replacement       1,020,000
    15             (Base Construction Allocation -
    16             $900,000)
    17             (Land Allocation - $20,000)
    18             (Design and Contingencies - $100,000)
    19         (15)  SR 3003, SR 3003 over West Branch
    20             Conneaut Creek, Conneaut Township,
    21             Bridge Replacement                            630,000
    22             (Base Construction Allocation -
    23             $550,000)
    24             (Land Allocation - $20,000)
    25             (Design and Contingencies - $60,000)
    26         (16)  SR 3014, SR 3014 over Trout Run,
    27             Waterford Borough, Bridge Replacement         370,000
    28             (Base Construction Allocation -
    29             $300,000)
    30             (Land Allocation - $20,000)
    19990S0504B1471                 - 296 -

     1             (Design and Contingencies - $50,000)
     2         (17)  SR 4007, SR 4007 over I-90, Fairview
     3             Township, Bridge Replacement                1,920,000
     4             (Base Construction Allocation -
     5             $1,800,000)
     6             (Land Allocation - $20,000)
     7             (Design and Contingencies - $100,000)
     8         (18)  SR 0020, Main Street Bridge over Elk
     9             Creek, Girard Township, Bridge
    10             Rehabilitation                              5,450,000
    11             (Base Construction Allocation -
    12             $5,000,000)
    13             (Land Allocation - $50,000)
    14             (Design and Contingencies - $400,000)
    15         (19)  SR 0090, I-90 Bridge, Eastbound over
    16             Six Mile Creek, Harborcreek Township,
    17             Bridge Rehabilitation                       6,350,000
    18             (Base Construction Allocation -
    19             $6,000,000)
    20             (Land Allocation - $50,000)
    21             (Design and Contingencies - $300,000)
    22         (20)  SR 0090, I-90 Bridge Westbound over
    23             Six Mile Creek, Harborcreek Township,
    24             Bridge Rehabilitation                       7,350,000
    25             (Base Construction Allocation -
    26             $7,000,000)
    27             (Land Allocation - $50,000)
    28             (Design and Contingencies - $300,000)
    29         (21)  SR 0090, Remington Road Bridge over
    30             I-90, North East Township, Bridge
    19990S0504B1471                 - 297 -

     1             Replacement                                   500,000
     2             (Base Construction Allocation -
     3             $400,000)
     4             (Land Allocation - $20,000)
     5             (Design and Contingencies - $80,000)
     6         (22)  SR 0505, Bridge over Mill Creek, City
     7             of Erie, Bridge Replacement                   460,000
     8             (Base Construction Allocation -
     9             $400,000)
    10             (Land Allocation - $20,000)
    11             (Design and Contingencies - $40,000)
    12         (23)  SR 0955, Bridge over Six Mile Creek,
    13             Harborcreek Township, Bridge
    14             Replacement                                   480,000
    15             (Base Construction Allocation -
    16             $400,000)
    17             (Land Allocation - $20,000)
    18             (Design and Contingencies - $60,000)
    19         (24)  SR 1019, Gay Road Bridge over I-90
    20             Eastbound and Westbound, North East
    21             Township, Bridge Replacement                2,630,000
    22             (Base Construction Allocation -
    23             $2,500,000)
    24             (Land Allocation - $20,000)
    25             (Design and Contingencies - $110,000)
    26         (25)  SR 3002, Cherry Hill Road Bridge over
    27             Conneaut Creek, Conneaut Township,
    28             Bridge Replacement                            620,000
    29             (Base Construction Allocation -
    30             $540,000)
    19990S0504B1471                 - 298 -

     1             (Land Allocation - $20,000)
     2             (Design and Contingencies - $60,000)
     3         (26)  SR 4014, Grandview Boulevard Bridge
     4             over I-79 Northbound and Southbound,
     5             City of Erie, Bridge Replacement            2,640,000
     6             (Base Construction Allocation -
     7             $2,500,000)
     8             (Land Allocation - $40,000)
     9             (Design and Contingencies - $100,000)
    10         (27)  SR 4016, West 38th Street Bridge over
    11             I-79 Northbound and Southbound, City of
    12             Erie, Bridge Rehabilitation                 1,730,000
    13             (Base Construction Allocation -
    14             $1,500,000)
    15             (Land Allocation - $30,000)
    16             (Design and Contingencies - $200,000)
    17         (28)  SR 2008, West High Street Bridge over
    18             Horton Run, Union Township, Bridge
    19             Replacement                                   260,000
    20             (Base Construction Allocation -
    21             $220,000)
    22             (Land Allocation - $10,000)
    23             (Design and Contingencies - $30,000)
    24         (29)  SR 0079, Bridges over Walnut Creek
    25             and West 32nd Street, Millcreek
    26             Township, Bridge Rehabilitation             2,800,000
    27             (Base Construction Allocation -
    28             $2,000,000)
    29             (Land Allocation - $10,000)
    30             (Design and Contingencies - $790,000)
    19990S0504B1471                 - 299 -

     1         (30)  SR 0090, Beckman Street Bridge over
     2             I-90, Girard Township, Bridge
     3             Rehabilitation                                400,000
     4             (Base Construction Allocation -
     5             $340,000)
     6             (Land Allocation - $10,000)
     7             (Design and Contingencies - $50,000)
     8         (31)  SR 0090, Crooked Creek Bridge over
     9             Crooked Creek, Girard Township, Bridge
    10             Replacement                                   700,000
    11             (Base Construction Allocation -
    12             $640,000)
    13             (Land Allocation - $10,000)
    14             (Design and Contingencies - $50,000)
    15         (32)  SR 0090, Elk Creek Railroad Bridge
    16             over Elk Creek, Bridge Replacement            999,000
    17             (Base Construction Allocation -
    18             $955,000)
    19             (Land Allocation - $4,000)
    20             (Design and Contingencies - $40,000)
    21         (33)  SR 0005, Bridge over East Lake Road,
    22             Harbor Creek Township, Bridge
    23             Rehabilitation                                800,000
    24             (Base Construction Allocation -
    25             $680,000)
    26             (Land Allocation - $20,000)
    27             (Design and Contingencies - $100,000)
    28         (34)  SR 0006, Bridge over Tributary of
    29             French Creek, LeBoeuf Township, Bridge
    30             Replacement                                   300,000
    19990S0504B1471                 - 300 -

     1             (Base Construction Allocation -
     2             $200,000)
     3             (Land Allocation - $20,000)
     4             (Design and Contingencies - $80,000)
     5         (35)  SR 0006, Bridge over Beaver Run,
     6             Wayne Township, Bridge Replacement            600,000
     7             (Base Construction Allocation -
     8             $500,000)
     9             (Land Allocation - $20,000)
    10             (Design and Contingencies - $80,000)
    11         (36)  SR 0008, Bridge over Hubbel Run,
    12             Amity Township, Bridge Replacement            500,000
    13             (Base Construction Allocation -
    14             $400,000)
    15             (Land Allocation - $20,000)
    16             (Design and Contingencies - $80,000)
    17         (37)  SR 0018, Bridge over N&W Railroad,
    18             Girard Borough, Bridge Replacement          1,920,000
    19             (Base Construction Allocation -
    20             $1,700,000)
    21             (Land Allocation - $20,000)
    22             (Design and Contingencies - $200,000)
    23         (38)  SR 0079, Bridge over SR 3006,
    24             Washington Township, Bridge
    25             Replacement                                 1,520,000
    26             (Base Construction Allocation -
    27             $1,300,000)
    28             (Land Allocation - $20,000)
    29             (Design and Contingencies - $200,000)
    30         (39)  SR 0079, Bridge over SR 3008,
    19990S0504B1471                 - 301 -

     1             Franklin Township, Bridge Replacement         920,000
     2             (Base Construction Allocation -
     3             $800,000)
     4             (Land Allocation - $20,000)
     5             (Design and Contingencies - $100,000)
     6         (40)  SR 0079, Bridge over T-481, Stancliff
     7             Road, Franklin Township, Bridge
     8             Replacement                                   920,000
     9             (Base Construction Allocation -
    10             $800,000)
    11             (Land Allocation - $20,000)
    12             (Design and Contingencies - $100,000)
    13         (41)  SR 0080, Bridge over Branch of French
    14             Creek, Greenfield Township, Bridge
    15             Replacement                                   300,000
    16             (Base Construction Allocation -
    17             $200,000)
    18             (Land Allocation - $20,000)
    19             (Design and Contingencies - $80,000)
    20         (42)  SR 0090, I-90 Bridge over T-666,
    21             Greenfield Township, Bridge
    22             Replacement                                 1,420,000
    23             (Base Construction Allocation -
    24             $1,200,000)
    25             (Land Allocation - $20,000)
    26             (Design and Contingencies - $200,000)
    27         (43)  SR 0090, I-90 Bridge over T-666,
    28             Greenfield Township, Bridge
    29             Replacement                                 1,120,000
    30             (Base Construction Allocation -
    19990S0504B1471                 - 302 -

     1             $1,000,000)
     2             (Land Allocation - $20,000)
     3             (Design and Contingencies - $100,000)
     4         (44)  SR 0090, I-90 Eastbound Bridge over
     5             SR 0089, North East Township, Bridge
     6             Replacement                                 2,600,000
     7             (Base Construction Allocation -
     8             $2,320,000)
     9             (Land Allocation - $20,000)
    10             (Design and Contingencies - $260,000)
    11         (45)  SR 0090, I-90 Westbound Bridge over
    12             SR 0089, North East Township, Bridge
    13             Replacement                                 2,400,000
    14             (Base Construction Allocation -
    15             $2,140,000)
    16             (Land Allocation - $20,000)
    17             (Design and Contingencies - $240,000)
    18         (46)  SR 0090, Shadouck Road over I-90,
    19             North East Township, Bridge
    20             Rehabilitation                              2,100,000
    21             (Base Construction Allocation -
    22             $1,880,000)
    23             (Land Allocation - $20,000)
    24             (Design and Contingencies - $200,000)
    25         (47)  SR 0090, I-90 Bridge over Conrail,
    26             North East Township, Bridge
    27             Replacement                                 2,000,000
    28             (Base Construction Allocation -
    29             $1,500,000)
    30             (Land Allocation - $100,000)
    19990S0504B1471                 - 303 -

     1             (Design and Contingencies - $400,000)
     2         (48)  SR 0090, I-90 Eastbound Bridge over
     3             PA 20, North East Township, Bridge
     4             Rehabilitation                                460,000
     5             (Base Construction Allocation -
     6             $400,000)
     7             (Land Allocation - $10,000)
     8             (Design and Contingencies - $50,000)
     9         (49)  SR 0090, I-90 Westbound Bridge over
    10             PA 20, North East Township, Bridge
    11             Rehabilitation                                460,000
    12             (Base Construction Allocation -
    13             $400,000)
    14             (Land Allocation - $10,000)
    15             (Design and Contingencies - $50,000)
    16         (50)  SR 0090, I-90 Eastbound Bridge over
    17             20 Mile Creek, North East Township,
    18             Bridge Rehabilitation                       1,620,000
    19             (Base Construction Allocation -
    20             $1,500,000)
    21             (Land Allocation - $20,000)
    22             (Design and Contingencies - $100,000)
    23         (51)  SR 0090, I-90 Westbound Bridge over
    24             20 Mile Creek, North East Township,
    25             Bridge Rehabilitation                       1,620,000
    26             (Base Construction Allocation -
    27             $1,500,000)
    28             (Land Allocation - $20,000)
    29             (Design and Contingencies - $100,000)
    30         (52)  SR 0097, Bridge over Branch of French
    19990S0504B1471                 - 304 -

     1             Creek, Union City Borough, Bridge
     2             Replacement                                   500,000
     3             (Base Construction Allocation -
     4             $400,000)
     5             (Land Allocation - $20,000)
     6             (Design and Contingencies - $80,000)
     7         (53)  SR 0426, Bridge over SR 0089, North
     8             East Borough, Bridge Replacement              600,000
     9             (Base Construction Allocation -
    10             $500,000)
    11             (Land Allocation - $20,000)
    12             (Design and Contingencies - $80,000)
    13         (54)  SR 1004, Bridge over West Branch of
    14             French Creek, Greenfield Township,
    15             Bridge Replacement                            800,000
    16             (Base Construction Allocation -
    17             $700,000)
    18             (Land Allocation - $20,000)
    19             (Design and Contingencies - $80,000)
    20         (55)  SR 1006, Moorheadville Road Bridge
    21             over I-90, North East Township, Bridge
    22             Replacement                                 2,600,000
    23             (Base Construction Allocation -
    24             $2,330,000)
    25             (Land Allocation - $20,000)
    26             (Design and Contingencies - $250,000)
    27         (56)  SR 1017, Bridge over Averill Run,
    28             North East Township, Bridge
    29             Replacement                                   200,000
    30             (Base Construction Allocation -
    19990S0504B1471                 - 305 -

     1             $100,000)
     2             (Land Allocation - $20,000)
     3             (Design and Contingencies - $80,000)
     4         (57)  SR 2008, Bridge over French Creek,
     5             Union Township, Bridge Replacement            200,000
     6             (Base Construction Allocation -
     7             $100,000)
     8             (Land Allocation - $20,000)
     9             (Design and Contingencies - $80,000)
    10         (58)  SR 2008, Bridge over French Creek,
    11             Union City Borough, Bridge Replacement      1,150,000
    12             (Base Construction Allocation -
    13             $1,000,000)
    14             (Land Allocation - $20,000)
    15             (Design and Contingencies - $130,000)
    16         (59)  SR 2010, Bridge over Pine Run, Union
    17             Township, Bridge Replacement                  200,000
    18             (Base Construction Allocation -
    19             $100,000)
    20             (Land Allocation - $20,000)
    21             (Design and Contingencies - $80,000)
    22         (60)  SR 2025, Bridge No.2 over Sciota
    23             Road, Wayne Township, Bridge
    24             Replacement                                   200,000
    25             (Base Construction Allocation -
    26             $100,000)
    27             (Land Allocation - $20,000)
    28             (Design and Contingencies - $80,000)
    29         (61)  SR 3001, Bridge No.2 over Ashtabula
    30             Creek, Conneaut Township, Bridge
    19990S0504B1471                 - 306 -

     1             Replacement                                   400,000
     2             (Base Construction Allocation -
     3             $300,000)
     4             (Land Allocation - $20,000)
     5             (Design and Contingencies - $80,000)
     6         (62)  SR 0005, Bridge over Lincoln Avenue,
     7             City of Erie, Bridge Replacement              900,000
     8             (Base Construction Allocation -
     9             $800,000)
    10             (Land Allocation - $20,000)
    11             (Design and Contingencies - $80,000)
    12         (63)  SR 0020, Westbound Bridge over I-79,
    13             City of Erie, Bridge Rehabilitation         4,330,000
    14             (Base Construction Allocation -
    15             $4,000,000)
    16             (Land Allocation - $30,000)
    17             (Design and Contingencies - $300,000)
    18         (64)  SR 0079, Southbound Bridge over West
    19             32nd Street, City of Erie, Bridge
    20             Replacement                                   720,000
    21             (Base Construction Allocation -
    22             $600,000)
    23             (Land Allocation - $20,000)
    24             (Design and Contingencies - $100,000)
    25         (65)  SR 3002, Bridge No.2 over Cherry Hill
    26             Road, Conneaut Township, Bridge
    27             Replacement                                   700,000
    28             (Base Construction Allocation -
    29             $600,000)
    30             (Land Allocation - $20,000)
    19990S0504B1471                 - 307 -

     1             (Design and Contingencies - $80,000)
     2         (66)  SR 3002, Bridge No.2 over Ashtabula
     3             Creek, Conneaut Township, Bridge
     4             Replacement                                   400,000
     5             (Base Construction Allocation -
     6             $300,000)
     7             (Land Allocation - $20,000)
     8             (Design and Contingencies - $80,000)
     9         (67)  SR 0005, Bridge over Walnut Creek,
    10             Fairview Township, Bridge
    11             Rehabilitation                                500,000
    12             (Base Construction Allocation -
    13             $410,000)
    14             (Land Allocation - $40,000)
    15             (Design and Contingencies - $50,000)
    16         (68)  SR 0090, Eastbound Bridge over
    17             Franklin Road, T-404, Fairview
    18             Township, Bridge Replacement                1,200,000
    19             (Base Construction Allocation -
    20             $1,080,000)
    21             (Land Allocation - $20,000)
    22             (Design and Contingencies - $100,000)
    23         (69)  SR 0020, Bridge over Walnut Creek,
    24             Fairview Township, Bridge
    25             Rehabilitation                                400,000
    26             (Base Construction Allocation -
    27             $300,000)
    28             (Land Allocation - $20,000)
    29             (Design and Contingencies - $80,000)
    30         (70)  SR 0098, Bridge over I-90, Fairview
    19990S0504B1471                 - 308 -

     1             Township, Bridge Rehabilitation               860,000
     2             (Base Construction Allocation -
     3             $800,000)
     4             (Land Allocation - $10,000)
     5             (Design and Contingencies - $50,000)
     6         (71)  SR 0090, Bridge over Platz Road,
     7             Fairview Township, Bridge
     8             Rehabilitation                                350,000
     9             (Base Construction Allocation -
    10             $300,000)
    11             (Land Allocation - $20,000)
    12             (Design and Contingencies - $30,000)
    13         (72)  SR 0090, Westbound Bridge over T-404,
    14             Fairview Township, Bridge Replacement       1,200,000
    15             (Base Construction Allocation -
    16             $1,080,000)
    17             (Land Allocation - $20,000)
    18             (Design and Contingencies - $100,000)
    19         (73)  SR 0018, Bridge over Elk Creek,
    20             Girard Borough, Bridge Replacement          1,020,000
    21             (Base Construction Allocation -
    22             $800,000)
    23             (Land Allocation - $20,000)
    24             (Design and Contingencies - $200,000)
    25         (74)  SR 3014, Bridge over Franklin Center
    26             Road Bridge, Girard Township, Bridge
    27             Replacement                                   400,000
    28             (Base Construction Allocation -
    29             $300,000)
    30             (Land Allocation - $20,000)
    19990S0504B1471                 - 309 -

     1             (Design and Contingencies - $80,000)
     2         (75)  SR 0090, Eastbound Bridge over Elk
     3             Creek, Girard Township, Bridge
     4             Replacement                                 6,500,000
     5             (Base Construction Allocation -
     6             $6,280,000)
     7             (Land Allocation - $20,000)
     8             (Design and Contingencies - $200,000)
     9         (76)  SR 0090, Westbound Bridge over Elk
    10             Creek and Railroad Tracks, Girard
    11             Township, Bridge Replacement                6,000,000
    12             (Base Construction Allocation -
    13             $5,780,000)
    14             (Land Allocation - $20,000)
    15             (Design and Contingencies - $200,000)
    16         (77)  SR 0090, Westbound Bridge over Neiger
    17             Road, Girard Township, Bridge
    18             Replacement                                 1,200,000
    19             (Base Construction Allocation -
    20             $1,080,000)
    21             (Land Allocation - $20,000)
    22             (Design and Contingencies - $100,000)
    23         (78)  SR 0020, Bridge over Elk Creek,
    24             Girard Township, Bridge Rehabilitation      8,500,000
    25             (Base Construction Allocation -
    26             $7,600,000)
    27             (Land Allocation - $50,000)
    28             (Design and Contingencies - $850,000)
    29         (79)  SR 0090, Eastbound Bridge over Neiger
    30             Road, Girard Township, Bridge
    19990S0504B1471                 - 310 -

     1             Replacement                                 2,000,000
     2             (Base Construction Allocation -
     3             $1,080,000)
     4             (Land Allocation - $20,000)
     5             (Design and Contingencies - $100,000)
     6         (80)  SR 0090, Eastbound Bridge over Elk
     7             Creek and Railroad, Girard Township,
     8             Bridge Replacement                          6,000,000
     9             (Base Construction Allocation -
    10             $5,780,000)
    11             (Land Allocation - $20,000)
    12             (Design and Contingencies - $200,000)
    13         (81)  SR 0090, Westbound Bridge over Elk
    14             Creek, Girard Township, Bridge
    15             Replacement                                 6,500,000
    16             (Base Construction Allocation -
    17             $6,280,000)
    18             (Land Allocation - $20,000)
    19             (Design and Contingencies - $200,000)
    20         (82)  SR 0090, Bridge over Four Mile Creek,
    21             Greene Township, Bridge Rehabilitation        800,000
    22             (Base Construction Allocation -
    23             $700,000)
    24             (Land Allocation - $20,000)
    25             (Design and Contingencies - $80,000)
    26         (83)  SR 0090, Bridge over Moore Road,
    27             Greene Township, Bridge Rehabilitation      1,700,000
    28             (Base Construction Allocation -
    29             $1,380,000)
    30             (Land Allocation - $20,000)
    19990S0504B1471                 - 311 -

     1             (Design and Contingencies - $300,000)
     2         (84)  SR 0090, Bridge over Clark Road,
     3             Harborcreek Township, Bridge
     4             Replacement                                 2,820,000
     5             (Base Construction Allocation -
     6             $2,500,000)
     7             (Land Allocation - $20,000)
     8             (Design and Contingencies - $300,000)
     9         (85)  SR 0020, Bridge over Four Mile Creek,
    10             Harborcreek Township, Bridge
    11             Replacement                                   400,000
    12             (Base Construction Allocation -
    13             $300,000)
    14             (Land Allocation - $20,000)
    15             (Design and Contingencies - $80,000)
    16         (86)  SR 0090, Westbound Bridge over SR
    17             0531, Harborcreek Township, Bridge
    18             Replacement                                 1,520,000
    19             (Base Construction Allocation -
    20             $1,300,000)
    21             (Land Allocation - $20,000)
    22             (Design and Contingencies - $200,000)
    23         (87)  SR 0090, Bridge over Jordan Road,
    24             Harborcreek Township, Bridge
    25             Rehabilitation                              2,800,000
    26             (Base Construction Allocation -
    27             $2,480,000)
    28             (Land Allocation - $20,000)
    29             (Design and Contingencies - $300,000)
    30         (88)  SR 0955, Bridge over Seven Mile
    19990S0504B1471                 - 312 -

     1             Creek, Harborcreek Township, Bridge
     2             Replacement                                   830,000
     3             (Base Construction Allocation -
     4             $700,000)
     5             (Land Allocation - $30,000)
     6             (Design and Contingencies - $100,000)
     7         (89)  SR 0090, Eastbound Bridge over SR
     8             0531, Harborcreek Township, Bridge
     9             Replacement                                 1,520,000
    10             (Base Construction Allocation -
    11             $1,300,000)
    12             (Land Allocation - $20,000)
    13             (Design and Contingencies - $200,000)
    14         (90)  SR 0005, Bridge over Elk Creek, Lake
    15             City Borough, Bridge Replacement            3,220,000
    16             (Base Construction Allocation -
    17             $2,900,000)
    18             (Land Allocation - $20,000)
    19             (Design and Contingencies - $300,000)
    20         (91)  SR 0006, Bridge over Mill Village
    21             Truss, LeBoeuf Township, Bridge
    22             Replacement                                 3,046,000
    23             (Base Construction Allocation -
    24             $2,980,000)
    25             (Land Allocation - $26,000)
    26             (Design and Contingencies - $40,000)
    27         (92)  SR 0832, Bridge over I-90, McKean
    28             Township, Bridge Rehabilitation             3,000,000
    29             (Base Construction Allocation -
    30             $2,670,000)
    19990S0504B1471                 - 313 -

     1             (Land Allocation - $30,000)
     2             (Design and Contingencies - $300,000)
     3         (93)  SR 4013, Bridge over Elk Creek,
     4             McKean Township, Bridge Replacement           600,000
     5             (Base Construction Allocation -
     6             $500,000)
     7             (Land Allocation - $20,000)
     8             (Design and Contingencies - $80,000)
     9         (94)  SR 0099, Bridge over Stancliff Road,
    10             McKean Township, Bridge Replacement         1,620,000
    11             (Base Construction Allocation -
    12             $1,400,000)
    13             (Land Allocation - $20,000)
    14             (Design and Contingencies - $200,000)
    15         (95)  SR 0090, Bridge over Millfair Road,
    16             McKean Township, Bridge Rehabilitation      1,820,000
    17             (Base Construction Allocation -
    18             $1,500,000)
    19             (Land Allocation - $20,000)
    20             (Design and Contingencies - $300,000)
    21         (96)  SR 0090, Bridge over SR 0008,
    22             Northbound and Southbound, Millcreek
    23             Township, Bridge Replacement                1,720,000
    24             (Base Construction Allocation -
    25             $1,500,000)
    26             (Land Allocation - $20,000)
    27             (Design and Contingencies - $200,000)
    28         (97)  SR 4012, Bridge over I-79, Millcreek
    29             Township, Bridge Replacement                5,020,000
    30             (Base Construction Allocation -
    19990S0504B1471                 - 314 -

     1             $4,500,000)
     2             (Land Allocation - $20,000)
     3             (Design and Contingencies - $500,000)
     4         (98)  SR 0019, Bridge No.2 over Walnut
     5             Creek, Millcreek Township, Bridge
     6             Replacement                                 1,890,000
     7             (Base Construction Allocation -
     8             $1,700,000)
     9             (Land Allocation - $20,000)
    10             (Design and Contingencies - $170,000)
    11         (99)  SR 0079, Southbound Bridge over
    12             Walnut Creek, Millcreek Township,
    13             Bridge Replacement                            420,000
    14             (Base Construction Allocation -
    15             $300,000)
    16             (Land Allocation - $20,000)
    17             (Design and Contingencies - $100,000)
    18         (100)  SR 0090, Bridge over Pond Road,
    19             Springfield Township, Bridge
    20             Replacement                                 1,600,000
    21             (Base Construction Allocation -
    22             $1,400,000)
    23             (Land Allocation - $50,000)
    24             (Design and Contingencies - $150,000)
    25         (101)  SR 0090, Bridge over McKees Road,
    26             Springfield Township, Bridge
    27             Replacement                                 1,550,000
    28             (Base Construction Allocation -
    29             $1,380,000)
    30             (Land Allocation - $20,000)
    19990S0504B1471                 - 315 -

     1             (Design and Contingencies - $150,000)
     2         (102)  SR 0090, Bridge over Huntley Road,
     3             Springfield Township, Bridge
     4             Replacement                                 1,700,000
     5             (Base Construction Allocation -
     6             $1,500,000)
     7             (Land Allocation - $50,000)
     8             (Design and Contingencies - $150,000)
     9         (103)  SR 0020, Bridge over Crooked Creek,
    10             Springfield Township, Bridge
    11             Replacement                                   930,000
    12             (Base Construction Allocation -
    13             $800,000)
    14             (Land Allocation - $30,000)
    15             (Design and Contingencies - $100,000)
    16         (104)  SR 0090, Bridge over Stanford Road,
    17             Springfield Township, Bridge
    18             Replacement                                 2,800,000
    19             (Base Construction Allocation -
    20             $2,450,000)
    21             (Land Allocation - $50,000)
    22             (Design and Contingencies - $300,000)
    23         (105)  SR 0090, Bridge over Walnut Creek,
    24             Summit Township, Bridge Replacement         2,340,000
    25             (Base Construction Allocation -
    26             $2,100,000)
    27             (Land Allocation - $40,000)
    28             (Design and Contingencies - $200,000)
    29         (106)  SR 0099, Bridge over I-90, Summit
    30             Township, Bridge Replacement                2,700,000
    19990S0504B1471                 - 316 -

     1             (Base Construction Allocation -
     2             $2,400,000)
     3             (Land Allocation - $50,000)
     4             (Design and Contingencies - $250,000)
     5         (107)  SR 0097, Bridge over LeBoeuf Creek,
     6             Summit Township, Bridge Replacement           600,000
     7             (Base Construction Allocation -
     8             $500,000)
     9             (Land Allocation - $20,000)
    10             (Design and Contingencies - $80,000)
    11         (108)  SR 2018, Railroad Bridge over Lovell
    12             Road, Concord Township, Bridge
    13             Rehabilitation                                200,000
    14             (Base Construction Allocation -
    15             $100,000)
    16             (Land Allocation - $25,000)
    17             (Design and Contingencies - $75,000)
    18         (109)  I-90 Bridge over Sixteen Mile Creek,
    19             Northeast Township, Bridge
    20             Rehabilitation                                500,000
    21             (Base Construction Allocation -
    22             $90,000)
    23             (Land Allocation - $10,000)
    24             (Design and Contingencies - $400,000)
    25  Section 30.  Fayette County.
    26     (a)  Local Bridges
    27         (1)  Brownsville Township, Lynn Run Road
    28             Bridge over Redstone Creek, Bridge
    29             Replacement                                   200,000
    30             (Base Construction Allocation -
    19990S0504B1471                 - 317 -

     1             $130,000)
     2             (Land Allocation - $10,000)
     3             (Design and Contingencies - $60,000)
     4         (2)  Dunbar Township, Falls Avenue Bridge
     5             over Possum Run, Bridge Replacement           450,000  <--
     6             (Base Construction Allocation -
     7             $350,000)
     8             (Land Allocation - $15,000)
     9             (Design and Contingencies - $85,000)
    10             OVER OPOSSUM RUN, BRIDGE REPLACEMENT          800,000  <--
    11             (BASE CONSTRUCTION ALLOCATION -
    12             $550,000)
    13             (LAND ALLOCATION - $50,000)
    14             (DESIGN AND CONTINGENCIES - $200,000)
    15         (3)  Georges Township, County Bridge No.162
    16             over Mountain Creek, Bridge
    17             Replacement                                   640,000
    18             (Base Construction Allocation -
    19             $425,000)
    20             (Land Allocation - $40,000)
    21             (Design and Contingencies - $175,000)
    22         (4)  German Township, Footedale Bridge
    23             No.66 over Dunlap Creek, Bridge
    24             Replacement                                   498,000
    25             (Base Construction Allocation -
    26             $313,000)
    27             (Land Allocation - $35,000)
    28             (Design and Contingencies - $150,000)
    29         (5)  German Township, County Bridge No.54
    30             over Browns Run, Bridge Replacement           793,000
    19990S0504B1471                 - 318 -

     1             (Base Construction Allocation -
     2             $563,000)
     3             (Land Allocation - $50,000)
     4             (Design and Contingencies - $180,000)
     5         (6)  German Township, Leckrone Bridge No.54
     6             over Browns Run, Bridge Replacement           430,000
     7             (Base Construction Allocation -
     8             $350,000)
     9             (Land Allocation - $5,000)
    10             (Design and Contingencies - $75,000)
    11         (7)  Menallen Township, T-509, Bridge over
    12             Branch of Dunlap Creek, Bridge
    13             Replacement                                   165,000
    14             (Base Construction Allocation -
    15             $110,000)
    16             (Land Allocation - $5,000)
    17             (Design and Contingencies - $50,000)
    18         (8)  Menallen Township, Fan Hallow Road
    19             Bridge over Fans Run, Bridge
    20             Replacement                                   145,000
    21             (Base Construction Allocation -
    22             $90,000)
    23             (Land Allocation - $5,000)
    24             (Design and Contingencies - $50,000)
    25         (9)  Menallen and North Union Townships,
    26             Fan Hollow Bridge No.184 over Jennings
    27             Run, Bridge Replacement                       440,000
    28             (Base Construction Allocation -
    29             $350,000)
    30             (Land Allocation - $10,000)
    19990S0504B1471                 - 319 -

     1             (Design and Contingencies - $80,000)
     2         (10)  Nicholson Township, County Bridge
     3             No.29 over York Run, Bridge
     4             Replacement                                   535,000
     5             (Base Construction Allocation -
     6             $350,000)
     7             (Land Allocation - $35,000)
     8             (Design and Contingencies - $150,000)
     9         (11)  Redstone Township, Merrittstown
    10             Bridge No.147 over Dunlap Creek, Bridge
    11             Replacement                                   435,000
    12             (Base Construction Allocation -
    13             $350,000)
    14             (Land Allocation - $10,000)
    15             (Design and Contingencies - $75,000)
    16         (12)  South Union Township, T-479, Leith
    17             Bridge No.41 over Redstone Creek,
    18             Bridge Replacement                            690,000
    19             (Base Construction Allocation -
    20             $475,000)
    21             (Land Allocation - $40,000)
    22             (Design and Contingencies - $175,000)
    23         (13)  Steward Township, T-798, Meadow Run
    24             Bridge No.82 over Meadow Run, Bridge
    25             Replacement                                   825,000
    26             (Base Construction Allocation -
    27             $575,000)
    28             (Land Allocation - $55,000)
    29             (Design and Contingencies - $195,000)
    30         (14)  Springhill Township, T-335, County
    19990S0504B1471                 - 320 -

     1             Bridge No.92 over York Run, Bridge
     2             Replacement                                 1,438,000
     3             (Base Construction Allocation -
     4             $1,113,000)
     5             (Land Allocation - $75,000)
     6             (Design and Contingencies - $250,000)
     7         (15)  Springfield Township, T-593, County
     8             Bridge No.111 over Mill Run, Bridge
     9             Replacement                                   320,000
    10             (Base Construction Allocation -
    11             $225,000)
    12             (Land Allocation - $20,000)
    13             (Design and Contingencies - $75,000)
    14         (16)  North Union Township, T-535, TOWNSHIP                <--
    15             BRIDGE NO.1 over Redstone Creek, Bridge
    16             Replacement                                   825,000
    17             (Base Construction Allocation -
    18             $625,000)
    19             (Land Allocation - $25,000)
    20             (Design and Contingencies - $175,000)
    21         (17)  North Union Township, T-557, TOWNSHIP                <--
    22             BRIDGE NO.3 over Redstone Creek, Bridge
    23             Replacement                                   450,000
    24             (Base Construction Allocation -
    25             $275,000)
    26             (Land Allocation - $50,000)
    27             (Design and Contingencies - $125,000)
    28         (18)  Georges Township, T-387, County
    29             Bridge No.102 over York Run, Bridge
    30             Rehabilitation                                320,000
    19990S0504B1471                 - 321 -

     1             (Base Construction Allocation -
     2             $225,000)
     3             (Land Allocation - $20,000)
     4             (Design and Contingencies - $75,000)
     5         (19)  South Union Township, T-459, Township
     6             Bridge No.1 over Lick Run, Bridge
     7             Replacement                                   280,000
     8             (Base Construction Allocation -
     9             $175,000)
    10             (Land Allocation - $25,000)
    11             (Design and Contingencies - $80,000)
    12         (20)  Stewart Township, T-415, County
    13             Bridge No.63 over Meadow Run, Bridge
    14             Replacement                                 1,005,000
    15             (Base Construction Allocation -
    16             $775,000)
    17             (Land Allocation - $50,000)
    18             (Design and Contingencies - $180,000)
    19         (21)  German Township, County Bridge No.54
    20             over Browns Run at Leith Community,
    21             Bridge Replacement                            430,000
    22             (Base Construction Allocation -
    23             $350,000)
    24             (Land Allocation - $5,000)
    25             (Design and Contingencies - $75,000)
    26         (22)  BROWNSVILLE TOWNSHIP, T-655, BRIDGE                  <--
    27             OVER A BRANCH OF REDSTONE CREEK
    28             BORDERING REDSTONE TOWNSHIP, BRIDGE
    29             REPLACEMENT                                   305,000
    30             (BASE CONSTRUCTION ALLOCATION -
    19990S0504B1471                 - 322 -

     1             $175,000)
     2             (LAND ALLOCATION - $5,000)
     3             (DESIGN AND CONTINGENCIES - $125,000)
     4         (23)  WHARTON TOWNSHIP, T-708, COLE ROAD
     5             BRIDGE OVER STONY RUN, BRIDGE
     6             REPLACEMENT                                   375,000
     7             (BASE CONSTRUCTION ALLOCATION -
     8             $250,000)
     9             (LAND ALLOCATION - $25,000)
    10             (DESIGN AND CONTINGENCIES - $100,000)
    11         (24)  WHARTON TOWNSHIP, T-345, QUEBEC ROAD
    12             BRIDGE OVER MILL RUN, BRIDGE
    13             REPLACEMENT                                   375,000
    14             (BASE CONSTRUCTION ALLOCATION -
    15             $250,000)
    16             (LAND ALLOCATION - $25,000)
    17             (DESIGN AND CONTINGENCIES - $100,000)
    18     (b)  State Bridges
    19         (1)  SR 0021, Masontown Bridge over
    20             Monongahela River, Railroad and Private
    21             Road, German Township, Bridge Painting      1,500,000
    22             (Base Construction Allocation -
    23             $1,500,000)
    24         (2)  SR 0031, Jacobs Creek Bridge over
    25             Branch of Jacobs Creek, Bullskin
    26             Township, Bridge Replacement                  290,000
    27             (Base Construction Allocation -
    28             $180,000)
    29             (Land Allocation - $35,000)
    30             (Design and Contingencies - $75,000)
    19990S0504B1471                 - 323 -

     1         (3)  SR 0119, Memorial Bridge over
     2             Youghiogheny River, Connellsville
     3             Borough, Bridge Painting                      100,000
     4             (Base Construction Allocation -
     5             $100,000)
     6         (4)  SR 0201, Furnace Run Bridge over
     7             Furnace Run, Franklin Township, Bridge
     8             Replacement                                   445,000
     9             (Base Construction Allocation -
    10             $245,000)
    11             (Land Allocation - $25,000)
    12             (Design and Contingencies - $175,000)
    13         (5)  SR 0711, Crawford Avenue Bridge over
    14             Youghiogheny River, Connellsville
    15             Borough, Bridge Painting                      100,000
    16             (Base Construction Allocation -
    17             $100,000)
    18         (6)  SR 0982, Jacobs Creek Bridge over
    19             Branch of Jacobs Creek, Bullskin
    20             Township, Bridge Replacement                  335,000
    21             (Base Construction Allocation -
    22             $225,000)
    23             (Land Allocation - $35,000)
    24             (Design and Contingencies - $75,000)
    25         (7)  SR 0982, Bridge over Mounts Creek,
    26             Bullskin Township, Bridge Painting            105,000
    27             (Base Construction Allocation -
    28             $105,000)
    29         (8)  SR 1051, Mounts Creek Bridge over
    30             Mounts Creek, Bullskin Township, Bridge
    19990S0504B1471                 - 324 -

     1             Replacement                                   436,000
     2             (Base Construction Allocation -
     3             $236,000)
     4             (Land Allocation - $25,000)
     5             (Design and Contingencies - $175,000)
     6         (9)  SR 3013, Browns Run Bridge over Browns
     7             Run, German Township, Bridge
     8             Replacement                                   631,000
     9             (Base Construction Allocation -
    10             $431,000)
    11             (Land Allocation - $25,000)
    12             (Design and Contingencies - $175,000)
    13         (10)  SR 3015, Muddy Run Bridge over Muddy
    14             Run, Georges Township, Bridge Painting         33,000
    15             (Base Construction Allocation -
    16             $33,000)
    17         (11)  SR 4038, Washington Run Bridge over
    18             Washington Run, Perry Township, Bridge
    19             Replacement                                   640,000
    20             (Base Construction Allocation -
    21             $440,000)
    22             (Land Allocation - $25,000)
    23             (Design and Contingencies - $175,000)
    24         (12)  SR 0381, SR 0381 over Stoney Run,
    25             Wharton Township, Bridge Replacement          663,000
    26             (Base Construction Allocation -
    27             $463,000)
    28             (Land Allocation - $50,000)
    29             (Design and Contingencies - $150,000)
    30         (13)  SR 0819, SR 0819 over Branch of
    19990S0504B1471                 - 325 -

     1             Jacobs Creek, Lower Tyrone Township,
     2             Bridge Replacement                            240,000
     3             (Base Construction Allocation -
     4             $125,000)
     5             (Land Allocation - $15,000)
     6             (Design and Contingencies - $100,000)
     7         (14)  SR 1021, SR 1021 over Breakneck Run,
     8             Bullskin Township, Bridge Replacement         650,000
     9             (Base Construction Allocation -
    10             $475,000)
    11             (Land Allocation - $50,000)
    12             (Design and Contingencies - $125,000)
    13         (15)  SR 1031, SR 1031 over Galley Run,
    14             Upper Tyrone Township, Bridge
    15             Replacement                                   475,000
    16             (Base Construction Allocation -
    17             $325,000)
    18             (Land Allocation - $25,000)
    19             (Design and Contingencies - $125,000)
    20         (16)  SR 1031, SR 1031 over Branch of
    21             Galley Run, Upper Tyrone Township,
    22             Bridge Replacement                            613,000
    23             (Base Construction Allocation -
    24             $413,000)
    25             (Land Allocation - $50,000)
    26             (Design and Contingencies - $150,000)
    27         (17)  SR 1044, SR 1044 over Branch of
    28             Mounts Creek, Bullskin Township, Bridge
    29             Replacement                                   350,000
    30             (Base Construction Allocation -
    19990S0504B1471                 - 326 -

     1             $200,000)
     2             (Land Allocation - $25,000)
     3             (Design and Contingencies - $125,000)
     4         (18)  SR 2003, SR 2003 over Chaney Run,
     5             Wharton Township, Bridge Replacement          290,000
     6             (Base Construction Allocation -
     7             $175,000)
     8             (Land Allocation - $15,000)
     9             (Design and Contingencies - $100,000)
    10         (19)  SR 3003, SR 3003 at Nicholson
    11             Township Border, Springhill Township,
    12             Bridge Replacement                          1,400,000
    13             (Base Construction Allocation -
    14             $1,125,000)
    15             (Land Allocation - $75,000)
    16             (Design and Contingencies - $200,000)
    17         (20)  SR 3003, SR 3003 over Georges Creek,
    18             Springhill Township, Bridge
    19             Replacement                                 1,450,000
    20             (Base Construction Allocation -
    21             $1,150,000)
    22             (Land Allocation - $75,000)
    23             (Design and Contingencies - $225,000)
    24         (21)  SR 3003, SR 3003 Nicholson Township
    25             over Georges Creek, Springhill
    26             Township, Bridge Replacement                1,200,000
    27             (Base Construction Allocation -
    28             $975,000)
    29             (Land Allocation - $50,000)
    30             (Design and Contingencies - $175,000)
    19990S0504B1471                 - 327 -

     1         (22)  SR 3009, SR 3009 over Georges Creek,
     2             Springhill Township, Bridge
     3             Replacement                                   863,000
     4             (Base Construction Allocation -
     5             $688,000)
     6             (Land Allocation - $25,000)
     7             (Design and Contingencies - $150,000)
     8         (23)  SR 3013, SR 3013 over Middle Run,
     9             German Township, Bridge Replacement           900,000
    10             (Base Construction Allocation -
    11             $650,000)
    12             (Land Allocation - $75,000)
    13             (Design and Contingencies - $175,000)
    14         (24)  SR 4027, SR 4027 over Little Redstone
    15             Creek, Jefferson Township, Bridge
    16             Replacement                                   538,000
    17             (Base Construction Allocation -
    18             $338,000)
    19             (Land Allocation - $50,000)
    20             (Design and Contingencies - $150,000)
    21         (25)  SR 4044, SR 4044 over Downers Run,
    22             Washington Township, Bridge
    23             Replacement                                   800,000
    24             (Base Construction Allocation -
    25             $575,000)
    26             (Land Allocation - $50,000)
    27             (Design and Contingencies - $175,000)
    28         (26)  SR 4046, SR 4046 over Lutz Run and
    29             Abandoned Railroad, Washington
    30             Township, Bridge Replacement                1,400,000
    19990S0504B1471                 - 328 -

     1             (Base Construction Allocation -
     2             $1,075,000)
     3             (Land Allocation - $75,000)
     4             (Design and Contingencies - $250,000)
     5         (27)  SR 1045, Bridge over Branch of
     6             Dickerson Run, Vanderbilt Borough,
     7             Bridge Replacement                            330,000
     8             (Base Construction Allocation -
     9             $225,000)
    10             (Land Allocation - $5,000)
    11             (Design and Contingencies - $100,000
    12         (28)  SR 0201, Bridge over Virgin Run,
    13             Franklin Township, Bridge Replacement         330,000
    14             (Base Construction Allocation -
    15             $225,000)
    16             (Land Allocation - $5,000)
    17             (Design and Contingencies - $100,000
    18         (29)  SR 4016, Bridge over Redstone Creek,
    19             Redstone Township, Bridge Replacement       1,030,000
    20             (Base Construction Allocation -
    21             $830,000)
    22             (Land Allocation - $$25,000)
    23             (Design and Contingencies - $175,000)
    24         (30)  SR 1021, Bridge over Breakneck Run,
    25             Bullskin Township, Bridge Replacement         505,000
    26             (Base Construction Allocation -
    27             $325,000)
    28             (Land Allocation - $5,000)
    29             (Design and Contingencies - $175,000)
    30         (31)  SR 1031, Bridge over Branch of Galley
    19990S0504B1471                 - 329 -

     1             Run, Upper Tyrone Township, Bridge
     2             Replacement                                   465,000
     3             (Base Construction Allocation -
     4             $300,000
     5             (Land Allocation - $15,000)
     6             (Design and Contingencies - $150,000)
     7         (32)  SR 3003, Bridge over Georges Creek,
     8             Springhill/Nicholson Township, Bridge
     9             Replacement                                   785,000
    10             (Base Construction Allocation -
    11             $600,000)
    12             (Land Allocation - $10,000)
    13             (Design and Contingencies - $175,000)
    14         (33)  SR 3003, Bridge over Georges Creek,
    15             Springhill/Nicholson Township, Bridge
    16             Replacement                                   885,000
    17             (Base Construction Allocation -
    18             $700,000)
    19             (Land Allocation - $10,000)
    20             (Design and Contingencies -$175,000)
    21         (34)  SR 4027, Bridge over Little Redstone
    22             Creek, Jefferson Township, Bridge
    23             Replacement                                   355,000
    24             (Base Construction Allocation -
    25             $250,000)
    26             (Land Allocation - $5,000)
    27             (Design and Contingencies - $100,000)
    28         (35)  SR 3007, Bridge over Georges Creek,
    29             Georges Township, Bridge Replacement          700,000
    30             (Base Construction Allocation -
    19990S0504B1471                 - 330 -

     1             $500,000)
     2             (Land Allocation - $25,000)
     3             (Design and Contingencies - $175,000)
     4         (36)  SR 0031, Jacobs Creek Bridge over
     5             Jacobs Creek, Bullskin Township,
     6             Fayette County, and Mt. Pleasant
     7             Township, Westmoreland County, Bridge
     8             Replacement                                   715,000
     9             (Base Construction Allocation -
    10             $500,000)
    11             (Land Allocation - $40,000)
    12             (Design and Contingencies - $175,000)
    13         (37)  SR 1037, Arch Street Bridge, City of
    14             Connellsville, Bridge Replacement             840,000
    15             (Base Construction Allocation -
    16             $557,000)
    17             (Land Allocation - $35,000)
    18             (Design and Contingencies - $248,000)
    19         (38)  SR 0021, Masontown Bridge over
    20             Monongahela River, German Township,
    21             Fayette County, Monongahela Township
    22             and Greene County, Bridge Replacement      36,000,000
    23             (Base Construction Allocation -
    24             $31,000,000)
    25             (Land Allocation - $2,500,000)
    26             (Design and Contingencies - $2,500,000)
    27         (39)  SR 1002, BRIDGE OVER TRIBUTARY OF                    <--
    28             YOUGHIOGHENY RIVER, LOWER TYRONE
    29             TOWNSHIP, BRIDGE REPLACEMENT                  155,000
    30             (BASE CONSTRUCTION ALLOCATION -
    19990S0504B1471                 - 331 -

     1             $100,000)
     2             (LAND ALLOCATION - $5,000)
     3             (DESIGN AND CONTINGENCIES - $50,000)
     4         (40)  SR 2031, BRIDGE OVER COAL LICK RUN,
     5             SOUTH UNION TOWNSHIP, BRIDGE
     6             REPLACEMENT                                   500,000
     7             (BASE CONSTRUCTION ALLOCATION -
     8             $350,000)
     9             (LAND ALLOCATION - $25,000)
    10             (DESIGN AND CONTINGENCIES - $125,000)
    11         (41)  SR 0051, BRIDGE OVER COAL LICK RUN,
    12             UNIONTOWN, BRIDGE REPLACEMENT                 663,000
    13             (BASE CONSTRUCTION ALLOCATION -
    14             $463,000)
    15             (LAND ALLOCATION - $50,000)
    16             (DESIGN AND CONTINGENCIES - $150,000)
    17         (42)  SR 0166, BRIDGE OVER DUNLAP CREEK,
    18             IMMEDIATELY SOUTH OF THE INTERSECTION
    19             OF SR 0166 AND SR 4008, REDSTONE
    20             TOWNSHIP, BRIDGE REPLACEMENT                  625,000
    21             (BASE CONSTRUCTION ALLOCATION -
    22             $200,000)
    23             (LAND ALLOCATION - $400,000)
    24             (DESIGN AND CONTINGENCIES - $25,000)
    25  Section 31.  Forest County.
    26     (a)  Local Bridges (Reserved)
    27     (b)  State Bridges
    28         (1)  SR 0227, SR 0227 over West Hickory
    29             Creek, Harmony Township, Bridge
    30             Replacement                                   480,000
    19990S0504B1471                 - 332 -

     1             (Base Construction Allocation -
     2             $400,000)
     3             (Land Allocation - $20,000)
     4             (Design and Contingencies - $60,000)
     5         (2)  SR 3001, SR 3001 over Little Tionesta
     6             Creek, Tionesta Township, Bridge
     7             Replacement                                   400,000
     8             (Base Construction Allocation -
     9             $310,000)
    10             (Land Allocation - $10,000)
    11             (Design and Contingencies - $80,000)
    12         (3)  SR 3004, SR 3004 over Little Hickory
    13             Creek, Hickory Township, Bridge
    14             Replacement                                   390,000
    15             (Base Construction Allocation -
    16             $300,000)
    17             (Land Allocation - $30,000)
    18             (Design and Contingencies - $60,000)
    19         (4)  SR 3004, SR 3004 over Piney Run, Green
    20             Township, Bridge Replacement                  390,000
    21             (Base Construction Allocation -
    22             $300,000)
    23             (Land Allocation - $10,000)
    24             (Design and Contingencies - $80,000)
    25         (5)  SR 3001, Red Brush Road Bridge over
    26             Little Tionesta Creek, Tionesta
    27             Township, Bridge Rehabilitation               605,000
    28             (Base Construction Allocation -
    29             $550,000)
    30             (Design and Contingencies - $55,000)
    19990S0504B1471                 - 333 -

     1         (6)  SR 1003, Bridge over Blue Jay Creek,
     2             Howe Township, Bridge Rehabilitation          340,000
     3             (Base Construction Allocation -
     4             $250,000)
     5             (Land Allocation - $30,000)
     6             (Design and Contingencies - $60,000)
     7         (7)  SR 1003, Bridge over Slater Run, Howe
     8             Township, Bridge Rehabilitation               400,000
     9             (Base Construction Allocation -
    10             $320,000)
    11             (Land Allocation - $20,000)
    12             (Design and Contingencies - $60,000)
    13         (8)  SR 1003, Bridge No.2 over Blue Jay
    14             Creek, Howe Township, Bridge
    15             Rehabilitation                                600,000
    16             (Base Construction Allocation -
    17             $500,000)
    18             (Land Allocation - $20,000)
    19             (Design and Contingencies - $80,000)
    20         (9)  SR 2005, Bridge over Millstone Creek,
    21             Jenks Township, Bridge Replacement            200,000
    22             (Base Construction Allocation -
    23             $100,000)
    24             (Land Allocation - $20,000)
    25             (Design and Contingencies - $80,000)
    26  Section 32.  Franklin County.
    27     (a)  Local Bridges (Reserved)
    28     (b)  State Bridges
    29         (1)  SR 3012, Social Island Road Bridge
    30             over Conococheague Creek, Hamilton
    19990S0504B1471                 - 334 -

     1             Township, Bridge Replacement                  786,000
     2             (Base Construction Allocation -
     3             $636,000)
     4             (Land Allocation - $95,000)
     5             (Design and Contingencies - $55,000)
     6         (2)  SR 4010, Edenville Road Bridge over
     7             Wilson Run, St. Thomas Township, Bridge
     8             Replacement                                   335,000
     9             (Base Construction Allocation -
    10             $225,000)
    11             (Land Allocation - $10,000)
    12             (Design and Contingencies - $100,000)
    13         (3)  SR 4009, over Wilson Run, St. Thomas
    14             Township, Bridge Replacement                  750,000
    15             (Base Construction Allocation -
    16             $500,000)
    17             (Land Allocation - $50,000)
    18             (Design and Contingencies - $200,000)
    19         (4)  SR 4007, Tuscarora Creek Bridge over
    20             Tuscarora Creek, Fannett Township,
    21             Bridge Replacement                          1,500,000
    22             (Base Construction Allocation -
    23             $1,000,000)
    24             (Land Allocation - $100,000)
    25             (Design and Contingencies - $400,000)
    26         (5)  PA 274, Bridge over Branch of
    27             Tuscarora Creek, Fannett Township,
    28             Bridge Replacement                            523,000
    29             (Base Construction Allocation -
    30             $387,000)
    19990S0504B1471                 - 335 -

     1             (Land Allocation - $39,000)
     2             (Design and Contingencies - $97,000)
     3         (6)  SR 4006, Bridge over West Branch of
     4             Conococheague Creek, Metal Township,
     5             Bridge Replacement                            727,000
     6             (Base Construction Allocation -
     7             $538,000)
     8             (Land Allocation - $54,000)
     9             (Design and Contingencies - $135,000)
    10         (7)  SR 4018, Bridge over Tributary of
    11             Conodoquinet Creek, Lurgan Township,
    12             Bridge Replacement                            473,000
    13             (Base Construction Allocation -
    14             $350,000)
    15             (Land Allocation - $35,000)
    16             (Design and Contingencies - $88,000)
    17         (8)  SR 4018, Bridge over Conodoquinet
    18             Creek, Southampton Township, Bridge
    19             Replacement                                   913,000
    20             (Base Construction Allocation -
    21             $689,000)
    22             (Land Allocation - $67,000)
    23             (Design and Contingencies - $157,000)
    24         (9)  SR 2016, Bridge over I-81, Antrim
    25             Township, Bridge Rehabilitation               891,000
    26             (Base Construction Allocation -
    27             $691,000)
    28             (Design and Contingencies - $200,000)
    29         (10)  SR 0533, Bridge over West Branch of
    30             Conococheague Creek, Metal Township,
    19990S0504B1471                 - 336 -

     1             Bridge Rehabilitation                       1,200,000
     2  Section 33.  Fulton County.
     3     (a)  Local Bridges
     4         (1)  Thompson Township, T-312, Bridge over
     5             Licking Creek, New Bridge Construction        990,000
     6             (Base Construction Allocation -
     7             $800,000)
     8             (Land Allocation - $15,000)
     9             (Design and Contingencies - $175,000)
    10         (2)  Thompson Township, T-348, Bridge over
    11             Licking Creek, New Bridge Construction        740,000
    12             (Base Construction Allocation -
    13             $575,000)
    14             (Land Allocation - $25,000)
    15             (Design and Contingencies - $140,000)
    16         (3)  Thompson Township, T-325, Bridge over
    17             Tonoloway Creek, New Bridge
    18             Construction                                  800,000
    19             (Base Construction Allocation -
    20             $625,000)
    21             (Land Allocation - $25,000)
    22             (Design and Contingencies - $150,000)
    23         (4)  Thompson Township, T-343, Bridge over
    24             Tonoloway Creek, New Bridge
    25             Construction                                  890,000
    26             (Base Construction Allocation -
    27             $700,000)
    28             (Land Allocation - $25,000)
    29             (Design and Contingencies - $165,000)
    30     (b)  State Bridges
    19990S0504B1471                 - 337 -

     1         (1)  SR 4007, Wooden Bridge over Wooden
     2             Bridge Creek, Taylor Township, Bridge
     3             Replacement                                   550,000
     4             (Base Construction Allocation -
     5             $405,000)
     6             (Land Allocation - $25,000)
     7             (Design and Contingencies - $120,000)
     8         (2)  SR 2005, Bridge over Plum Run,
     9             Thompson Township, Bridge
    10             Rehabilitation                                 50,000
    11             (Base Construction Allocation -
    12             $36,000)
    13             (Land Allocation - $1,000)
    14             (Design and Contingencies - $13,000)
    15         (3)  SR 4010, Bridge over Roaring Run,
    16             Wells Township, Bridge Rehabilitation          88,000
    17             (Base Construction Allocation -
    18             $72,000)
    19             (Land Allocation - $2,000)
    20             (Design and Contingencies - $14,000)
    21  Section 34.  Greene County.
    22     (a)  Local Bridges
    23         (1)  Morgan Township, County Bridge No.89
    24             over Browns Run, Bridge Replacement           286,000
    25             (Base Construction Allocation -
    26             $166,000)
    27             (Land Allocation - $20,000)
    28             (Design and Contingencies - $100,000)
    29         (2)  Morgan Township, County Bridge No.90
    30             over Browns Run, Bridge Replacement           282,000
    19990S0504B1471                 - 338 -

     1             (Base Construction Allocation -
     2             $162,000)
     3             (Land Allocation - $20,000)
     4             (Design and Contingencies - $100,000)
     5         (3)  Morgan Township, County Bridge No.91
     6             over Browns Run, Bridge Replacement           273,000
     7             (Base Construction Allocation -
     8             $153,000)
     9             (Land Allocation - $20,000)
    10             (Design and Contingencies - $100,000)
    11         (4)  Cumberland Township, T-517, County
    12             Bridge No.4, Ullery Road over Goose
    13             Run, Bridge Replacement                       360,000
    14             (Base Construction Allocation -
    15             $200,000)
    16             (Land Allocation - $10,000)
    17             (Design and Contingencies - $150,000)
    18         (5)  Cumberland Township, T-634, County
    19             Bridge No.15, Coal Hill Road over Muddy
    20             Creek, Bridge Replacement                     410,000  <--
    21             (Base Construction Allocation -
    22             $240,000)
    23             (Land Allocation - $10,000)
    24             (Design and Contingencies - $160,000)
    25             CREEK, BRIDGE REPLACEMENT                     805,000  <--
    26             (BASE CONSTRUCTION ALLOCATION -
    27             $625,000)
    28             (LAND ALLOCATION - $20,000)
    29         (6)  Greene Township, T-411, County Bridge
    30             No.20 over Whitely Creek, Bridge
    19990S0504B1471                 - 339 -

     1             Replacement                                 1,075,000
     2             (Base Construction Allocation -
     3             $900,000)
     4             (Land Allocation - $25,000)
     5             (Design and Contingencies - $150,000)
     6         (7)  Gray Township, T-392, County Bridge
     7             No.63 over Grays Creek, Bridge
     8             Replacement                                   380,000
     9             (Base Construction Allocation -
    10             $220,000)
    11             (Land Allocation - $10,000)
    12             (Design and Contingencies - $150,000)
    13         (8)  Washington Township, T-550, County
    14             Bridge No.97 over Craynes Run, Bridge
    15             Replacement                                   360,000  <--
    16             (Base Construction Allocation -
    17             $200,000)
    18             (Land Allocation - $10,000)
    19             REPLACEMENT                                   465,000  <--
    20             (BASE CONSTRUCTION ALLOCATION -
    21             $300,000)
    22             (LAND ALLOCATION - $15,000)
    23             (Design and Contingencies - $150,000)
    24         (9)  Morris Township, T-629, County Bridge
    25             No.73 over Bates Fork Creek, Bridge
    26             Replacement                                   490,000
    27             (Base Construction Allocation -
    28             $350,000)
    29             (Land Allocation - $15,000)
    30             (Design and Contingencies - $125,000)
    19990S0504B1471                 - 340 -

     1         (10)  Cumberland Township, T-660, County
     2             Bridge No.13 over Muddy Creek, Bridge
     3             Replacement                                   565,000
     4             (Base Construction Allocation -
     5             $400,000)
     6             (Land Allocation - 15,000)
     7             (Design and Contingencies - $150,000)
     8         (11)  Aleppo Township, T-304, County Bridge
     9             No.108 over Branch of Harts Run, Bridge
    10             Replacement                                   575,000
    11             (Base Construction Allocation -
    12             $425,000)
    13             (Land Allocation - $25,000)
    14             (Design and Contingencies - $125,000)
    15         (12)  Franklin Township, T-511, Bridge
    16             No.30 over Smith Creek, Bridge
    17             Replacement                                   625,000
    18             (Base Construction Allocation -
    19             $475,000)
    20             (Land Allocation - $25,000)
    21             (Design and Contingencies - $125,000)
    22         (13)  Morgan Township, T-659, Bridge No.87
    23             over Ten Mile Creek, Bridge
    24             Replacement                                 1,275,000
    25             (Base Construction Allocation -
    26             $1,100,000)
    27             (Land Allocation - $25,000)
    28             (Design and Contingencies - $150,000)
    29         (14)  Richhill Township, T-356, Bridge
    30             No.57 over North Fork of Wheeling
    19990S0504B1471                 - 341 -

     1             Creek, Bridge Replacement                     765,000
     2             (Base Construction Allocation -
     3             $625,000)
     4             (Land Allocation - $15,000)
     5             (Design and Contingencies - $125,000)
     6         (15)  Jackson Township, T-381, Bridge
     7             No.109 over Job Creek, Bridge
     8             Replacement                                   465,000
     9             (Base Construction Allocation -
    10             $325,000)
    11             (Land Allocation - $15,000)
    12             (Design and Contingencies - $125,000)
    13         (16)  CUMBERLAND TOWNSHIP, T-517, COUNTY                   <--
    14             BRIDGE NO.4 OVER LITTLE WHITELY CREEK,
    15             BRIDGE REPLACEMENT                            440,000
    16             (BASE CONSTRUCTION ALLOCATION -
    17             $300,000)
    18             (LAND ALLOCATION - $15,000)
    19             (DESIGN AND CONTINGENCIES - $125,000)
    20         (17)  ALEPPO/RICHHILL TOWNSHIP LINE, T-417,
    21             COUNTY BRIDGE NO.71 OVER HARTS RUN,
    22             BRIDGE REPLACEMENT                            625,000
    23             (BASE CONSTRUCTION ALLOCATION -
    24             $475,000)
    25             (LAND ALLOCATION - $25,000)
    26             (DESIGN AND CONTINGENCIES - $125,000)
    27         (18)  ALEPPO AND RICHHILL TOWNSHIPS AT
    28             TOWNSHIP LINE, T-417, COUNTY BRIDGE
    29             NO.71 OVER HARTS RUN, BRIDGE
    30             REPLACEMENT                                   625,000
    19990S0504B1471                 - 342 -

     1             (BASE CONSTRUCTION ALLOCATION -
     2             $475,000)
     3             (LAND ALLOCATION - $25,000)
     4             (DESIGN AND CONTINGENCIES - $125,000)
     5     (b)  State Bridges
     6         (1)  SR 0018, Bridge over South Fork of Ten
     7             Mile Creek, Franklin Township, Bridge
     8             Rehabilitation                                320,000
     9             (Base Construction Allocation -
    10             $280,000)
    11             (Design and Contingencies - $40,000)
    12         (2)  SR 0018, Bates Creek Bridge over Bates
    13             Fork and Browns Creeks, Washington
    14             Township, Bridge Replacement                  650,000
    15             (Base Construction Allocation -
    16             $450,000)
    17             (Land Allocation - $25,000)
    18             (Design and Contingencies - $175,000)
    19         (3)  SR 0021, Grinnage Run Bridge over
    20             Grinnage Run, Gray Township, Bridge
    21             Replacement                                   453,000
    22             (Base Construction Allocation -
    23             $253,000)
    24             (Land Allocation - $25,000)
    25             (Design and Contingencies - $175,000)
    26         (4)  SR 0079, I-79 Bridge over T-631,
    27             Washington Township, Bridge
    28             Replacement                                   980,000
    29             (Base Construction Allocation -
    30             $740,000)
    19990S0504B1471                 - 343 -

     1             (Land Allocation - $40,000)
     2             (Design and Contingencies - $200,000)
     3         (5)  SR 0079, I-79 Bridge over T-631,
     4             Washington Township, Bridge
     5             Rehabilitation                                945,000
     6             (Base Construction Allocation -
     7             $705,000)
     8             (Land Allocation - $40,000)
     9             (Design and Contingencies - $200,000)
    10         (6)  SR 0079, I-79 Bridge over PA 221,
    11             Washington Township, Bridge
    12             Replacement                                 2,074,000
    13             (Base Construction Allocation -
    14             $1,784,000)
    15             (Land Allocation - $40,000)
    16             (Design and Contingencies - $250,000)
    17         (7)  SR 0079, I-79 Bridge No.2 over PA 221,
    18             Washington Township, Bridge
    19             Replacement                                 2,074,000
    20             (Base Construction Allocation -
    21             $1,784,000)
    22             (Land Allocation - $40,000)
    23             (Design and Contingencies - $250,000)
    24         (8)  SR 0079, I-79 Bridge over T-512,
    25             Washington Township, Bridge
    26             Rehabilitation                                980,000
    27             (Base Construction Allocation -
    28             $740,000)
    29             (Land Allocation - $40,000)
    30             (Design and Contingencies - $200,000)
    19990S0504B1471                 - 344 -

     1         (9)  SR 0079, I-79 Bridge No.2 over T-512,
     2             Washington Township, Bridge
     3             Replacement                                 1,020,000
     4             (Base Construction Allocation -
     5             $780,000)
     6             (Land Allocation - $40,000)
     7             (Design and Contingencies - $200,000)
     8         (10)  SR 0088, Albert Gallatin Bridge over
     9             Monongahela River, Dunkard Township,
    10             Bridge Painting                             1,500,000
    11             (Base Construction Allocation -
    12             $1,500,000)
    13         (11)  SR 0088, Point Marion Bridge over
    14             Monongahela River, Dunkard Township,
    15             Bridge Replacement                          6,200,000
    16             (Base Construction Allocation -
    17             $5,500,000)
    18             (Land Allocation - $200,000)
    19             (Design and Contingencies - $500,000)
    20         (12)  SR 0218, Roberts Run Bridge No.2 over
    21             Roberts Run, Wayne Township, Bridge
    22             Replacement                                   768,000
    23             (Base Construction Allocation -
    24             $568,000)
    25             (Land Allocation - $25,000)
    26             (Design and Contingencies - $175,000)
    27         (13)  SR 2003, Bridge over Branch of
    28             Dunkard Creek, Perry Township, Bridge
    29             Replacement                                   625,000
    30             (Base Construction Allocation -
    19990S0504B1471                 - 345 -

     1             $400,000)
     2             (Land Allocation - $25,000)
     3             (Design and Contingencies - $200,000)
     4         (14)  SR 3007, Bridge over Branch of
     5             Wheeling Creek, Richill Township,
     6             Bridge Replacement                            375,000
     7             (Base Construction Allocation -
     8             $175,000)
     9             (Land Allocation - $25,000)
    10             (Design and Contingencies - $175,000)
    11         (15)  SR 3006, Dunkard Bridge over Branch
    12             of Dunkard Creek, Gilmore Township,
    13             Bridge Replacement                             99,000
    14             (Base Construction Allocation -
    15             $80,000)
    16             (Land Allocation - $11,000)
    17             (Design and Contingencies - $8,000)
    18         (16)  SR 3017, Bridge over Fork of Fish
    19             Creek, Freeport Township, Bridge
    20             Replacement                                 1,500,000
    21             (Base Construction Allocation -
    22             $1,000,000)
    23             (Land Allocation - $100,000)
    24             (Design and Contingencies - $400,000)
    25  Section 35.  Huntingdon County.
    26     (a)  Local Bridges
    27         (1)  Mill Creek Borough, Main Street Bridge
    28             over Mill Creek, Bridge Rehabilitation         30,000
    29             (Base Construction Allocation -
    30             $30,000)
    19990S0504B1471                 - 346 -

     1         (2)  Juniata Township, T-428, Corbin Bridge
     2             over Raystown Branch of Juniata River,
     3             Bridge Replacement                            920,000
     4             (Base Construction Allocation -
     5             $920,000)
     6         (3)  Springfield Township, T-313, Walnut
     7             Grove Bridge, County Bridge No.2 over
     8             Sideling Hill Creek, Bridge
     9             Replacement                                   975,000
    10             (Base Construction Allocation -
    11             $800,000)
    12             (Land Allocation - $25,000)
    13             (Design and Contingencies - $150,000)
    14         (4)  Jackson Township, T-525, Bridge over
    15             Stone Creek, Bridge Rehabilitation            470,000
    16             (Base Construction Allocation -
    17             $350,000)
    18             (Design and Contingencies - $120,000)
    19         (5)  Jackson Township, T-534, Bridge over
    20             Greenlee Run, Bridge Rehabilitation           250,000
    21             (Base Construction Allocation -
    22             $170,000)
    23             (Design and Contingencies - $80,000)
    24         (6)  Jackson Township, T-529, Bridge over
    25             Stone Creek, Bridge Replacement               469,000
    26             (Base Construction Allocation -
    27             $355,000)
    28             (Design and Contingencies - $114,000)
    29         (7)  Jackson Township, T-534, Bridge over
    30             Greenlee Run, Bridge Replacement              246,000
    19990S0504B1471                 - 347 -

     1             (Base Construction Allocation -
     2             $169,000)
     3             (Design and Contingencies - $77,000)
     4         (8)  Jackson Township, T-534, Eckley Road
     5             Bridge over Croyle Run, Bridge
     6             Replacement                                   255,000
     7             (Base Construction Allocation -
     8             $195,000)
     9             (Land Allocation - $10,000)
    10             (Design and Contingencies - $50,000)
    11         (9)  Shirley Township, T-373, Bridge over
    12             Aughwick Creek, Bridge Replacement            500,000
    13             (Base Construction Allocation -
    14             $300,000)
    15             (Land Allocation - $10,000)
    16             (Design and Contingencies - $190,000)
    17         (10)  Springfield Township, T-308, Bridge
    18             over Lick Run, Bridge Replacement             475,000
    19             (Base Construction Allocation -
    20             $350,000)
    21             (Land Allocation - $5,000)
    22             (Design and Contingencies - $120,000)
    23         (11)  Springfield Township, T-330, Bridge
    24             over Elliot Run, Bridge Replacement           425,000
    25             (Base Construction Allocation -
    26             $300,000)
    27             (Land Allocation - $5,000)
    28             (Design and Contingencies - $120,000)
    29         (12)  Springfield Township, T-332, Bridge
    30             over Elliot Run, Bridge Replacement           425,000
    19990S0504B1471                 - 348 -

     1             (Base Construction Allocation -
     2             $300,000)
     3             (Land Allocation - $5,000)
     4             (Design and Contingencies - $120,000)
     5         (13)  Todd Township, T-370, Bridge over
     6             Great Trough Creek, Bridge Replacement        565,000
     7             (Base Construction Allocation -
     8             $450,000)
     9             (Land Allocation - $15,000)
    10             (Design and Contingencies - $100,000)
    11         (14)  Todd Township, T-368, Bridge over
    12             Great Trough Creek, Bridge Replacement        400,000
    13             (Base Construction Allocation -
    14             $300,000)
    15             (Land Allocation - $10,000)
    16             (Design and Contingencies - $90,000)
    17         (15)  Springfield Township, T-330, Bridge
    18             over Elliot Run, Bridge Replacement           425,000
    19             (Base Construction Allocation -
    20             $300,000)
    21             (Land Allocation - $5,000)
    22             (Design and Contingencies - $120,000)
    23         (16)  Springfield Township, T-308, Bridge
    24             over Lick Run, Bridge Replacement             475,000
    25             (Base Construction Allocation -
    26             $350,000)
    27             (Land Allocation - $5,000)
    28             (Design and Contingencies - $120,000)
    29         (17)  Springfield Township, T-332, Bridge
    30             over Elliot Run, Bridge Replacement           425,000
    19990S0504B1471                 - 349 -

     1             (Base Construction Allocation -
     2             $300,000)
     3             (Land Allocation - $5,000)
     4             (Design and Contingencies - $120,000)
     5         (18)  SPRUCE CREEK TOWNSHIP, T-515, BRIDGE                 <--
     6             NO.2 OVER SPRUCE CREEK, BRIDGE
     7             REPLACEMENT                                   471,000
     8             (BASE CONSTRUCTION ALLOCATION -
     9             $357,000)
    10             (LAND ALLOCATION - $11,000)
    11             (DESIGN AND CONTINGENCIES - $103,000)
    12     (b)  State Bridges
    13         (1)  SR 0522, Aughwick Bridge over Aughwick
    14             Creek, East Broad Top Railroad and T-
    15             396, Shirley Township, Bridge
    16             Replacement                                   825,000
    17             (Base Construction Allocation -
    18             $750,000)
    19             (Design and Contingencies - $75,000)
    20         (2)  SR  1011, Murrays Run Bridge over
    21             Murrays Run, Oneida Township, Bridge
    22             Replacement                                   615,000
    23             (Base Construction Allocation -
    24             $420,000)
    25             (Land Allocation - $75,000)
    26             (Design and Contingencies - $120,000)
    27         (3)  SR  2011, Narrows Creek Bridge over
    28             Narrows Creek, Tell Township, Bridge
    29             Replacement                                   785,000
    30             (Base Construction Allocation -
    19990S0504B1471                 - 350 -

     1             $590,000)
     2             (Land Allocation - $50,000)
     3             (Design and Contingencies - $145,000)
     4         (4)  SR 1005, Mill Creek Bridge over Mill
     5             Creek, Brady Township, Bridge
     6             Replacement                                   815,000
     7             (Base Construction Allocation -
     8             $625,000)
     9             (Land Allocation - $40,000)
    10             (Design and Contingencies - $150,000)
    11         (5)  SR  2019, Licking Creek Bridge over
    12             Licking Creek, Shirley Township, Bridge
    13             Replacement                                   505,000
    14             (Base Construction Allocation -
    15             $365,000)
    16             (Land Allocation - $25,000)
    17             (Design and Contingencies - $115,000)
    18         (6)  SR 0305, Bridge over Tributary of
    19             Standing Stone Creek, Jackson Township,
    20             Bridge Rehabilitation                          50,000
    21             (Base Construction Allocation -
    22             $36,000)
    23             (Land Allocation - $1,000)
    24             (Design and Contingencies - $13,000)
    25         (7)  SR 0522, Bridge over Tributary of
    26             North Branch of Little Aughwick Creek,
    27             Dublin Township, Bridge Rehabilitation         75,000
    28             (Base Construction Allocation -
    29             $56,000)
    30             (Land Allocation - $1,000)
    19990S0504B1471                 - 351 -

     1             (Design and Contingencies - $18,000)
     2         (8)  SR 0655, Bridge over Tributary of
     3             Hares Valley Creek, Cass Township,
     4             Bridge Rehabilitation                          50,000
     5             (Base Construction Allocation -
     6             $36,000)
     7             (Land Allocation - $1,000)
     8             (Design and Contingencies - $13,000)
     9         (9)  SR 0747, Bridge over Tributary of
    10             Three Springs Creek, Cromwell Township,
    11             Bridge Rehabilitation                          50,000
    12             (Base Construction Allocation -
    13             $36,000)
    14             (Land Allocation - $1,000)
    15             (Design and Contingencies - $13,000)
    16         (10)  SR 0747, Bridge over Old Womens Run,
    17             Cromwell Township, Bridge
    18             Rehabilitation                                 45,000
    19             (Base Construction Allocation -
    20             $33,000)
    21             (Land Allocation - $1,000)
    22             (Design and Contingencies - $11,000)
    23         (11)  SR 0747, Bridge over Sugar Run,
    24             Cromwell Township, Bridge
    25             Rehabilitation                                 45,000
    26             (Base Construction Allocation -
    27             $33,000)
    28             (Land Allocation - $1,000)
    29             (Design and Contingencies - $11,000)
    30         (12)  SR 0994, Bridge over Haw Run, Todd
    19990S0504B1471                 - 352 -

     1             Township, Bridge Rehabilitation                45,000
     2             (Base Construction Allocation -
     3             $33,000)
     4             (Land Allocation - $1,000)
     5             (Design and Contingencies - $11,000)
     6         (13)  SR 1005, Bridge over Tributary of
     7             Mill Creek, Brady Township, Bridge
     8             Rehabilitation                                 55,000
     9             (Base Construction Allocation -
    10             $40,000)
    11             (Land Allocation - $1,000)
    12             (Design and Contingencies - $14,000)
    13         (14)  SR 2005, Bridge over Elliot Run, Clay
    14             Township, Bridge Rehabilitation                52,000
    15             (Base Construction Allocation -
    16             $38,000)
    17             (Land Allocation - $1,000)
    18             (Design and Contingencies - $13,000)
    19         (15)  SR 2007, Bridge over Little Aughwick
    20             Creek, Dublin Township, Bridge
    21             Rehabilitation                                152,000
    22             (Base Construction Allocation -
    23             $125,000)
    24             (Land Allocation - $2,000)
    25             (Design and Contingencies - $25,000)
    26  Section 36.  Indiana County.
    27     (a)  Local Bridges
    28         (1)  Banks Township, T-974, County Bridge
    29             No.13, Bear Run Bridge over Bear Run,
    30             Bridge Replacement                            500,000
    19990S0504B1471                 - 353 -

     1             (Base Construction Allocation -
     2             $400,000)
     3             (Land Allocation - $20,000)
     4             (Design and Contingencies - $80,000)
     5         (2)  Blacklick Township, T-574, Muddy Run
     6             Bridge over Muddy Run, Bridge
     7             Replacement                                   380,000
     8             (Base Construction Allocation -
     9             $300,000)
    10             (Land Allocation - $10,000)
    11             (Design and Contingencies - $70,000)
    12         (3)  Cherryhill Township, T-686, County
    13             Bridge No.65, Grace Church Bridge over
    14             Two Lick Creek, Bridge Replacement            600,000
    15             (Base Construction Allocation -
    16             $500,000)
    17             (Land Allocation - $20,000)
    18             (Design and Contingencies - $80,000)
    19         (4)  Cherryhill Township, T-978, Allen
    20             Bridge over Two Lick Reservoir, Bridge
    21             Rehabilitation                                264,000
    22             (Base Construction Allocation -
    23             $200,000)
    24             (Land Allocation - $10,000)
    25             (Design and Contingencies - $54,000)
    26         (5)  Rayne Township, T-760, County Bridge
    27             No.23-A, Chambersville Bridge over
    28             Crooked Creek, Bridge Rehabilitation          190,000
    29             (Base Construction Allocation -
    30             $150,000)
    19990S0504B1471                 - 354 -

     1             (Land Allocation - $10,000)
     2             (Design and Contingencies - $30,000)
     3         (6)  Grant Township, T-820 over Crooked
     4             Run, Bridge Replacement                       245,000
     5             (Base Construction Allocation -
     6             $200,000)
     7             (Land Allocation - $10,000)
     8             (Design and Contingencies - $35,000)
     9     (b)  State Bridges
    10         (1)  SR 0022, Chestnut Ridge Bridge over SR
    11             0119, Burrell Township, Bridge
    12             Painting                                       90,000
    13             (Base Construction Allocation -
    14             $75,000)
    15             (Design and Contingencies - $15,000)
    16         (2)  SR 0022, Armagh Bridge over SR 0056,
    17             West Wheatfield Township, Bridge
    18             Painting                                      145,000
    19             (Base Construction Allocation -
    20             $130,000)
    21             (Design and Contingencies - $15,000)
    22         (3)  SR 0119, Blacklick Bridge over
    23             Blacklick Creek, Burrell Township,
    24             Bridge Painting                               280,000
    25             (Base Construction Allocation -
    26             $265,000)
    27             (Design and Contingencies - $15,000)
    28         (4)  SR 0119, Bypass Steel Bridge No.1 over
    29             Wayne Avenue Ramps, White Township,
    30             Bridge Painting                               170,000
    19990S0504B1471                 - 355 -

     1             (Base Construction Allocation -
     2             $155,000)
     3             (Design and Contingencies - $15,000)
     4         (5)  SR 0119, Bypass Steel Bridge No.2 over
     5             Wayne Avenue Ramps, White Township,
     6             Bridge Painting                               170,000
     7             (Base Construction Allocation -
     8             $155,000)
     9             (Design and Contingencies - $15,000)
    10         (6)  SR 0119, Bypass Steel Bridge No.3 over
    11             SR 0422, White Township, Bridge
    12             Painting                                      240,000
    13             (Base Construction Allocation -
    14             $225,000)
    15             (Design and Contingencies - $15,000)
    16         (7)  SR 0119, Bypass Steel Bridge No.4 over
    17             SR 0422, White Township, Bridge
    18             Painting                                      240,000
    19             (Base Construction Allocation -
    20             $225,000)
    21             (Design and Contingencies - $15,000)
    22         (8)  SR 0119, Bypass Steel Bridge No.5 over
    23             SR 0954, White Township, Bridge
    24             Painting                                      195,000
    25             (Base Construction Allocation -
    26             $180,000)
    27             (Design and Contingencies - $15,000)
    28         (9)  SR 0119, Bypass Steel Bridge No.6 over
    29             SR 0954, White Township, Bridge
    30             Painting                                      175,000
    19990S0504B1471                 - 356 -

     1             (Base Construction Allocation -
     2             $160,000)
     3             (Design and Contingencies - $15,000)
     4         (10)  SR 0119, Bypass Steel Bridge No.7
     5             over SR 0286, White Township, Bridge
     6             Painting                                      235,000
     7             (Base Construction Allocation -
     8             $220,000)
     9             (Design and Contingencies - $15,000)
    10         (11)  SR 0119, Bypass Steel Bridge No.8
    11             over SR 0286, White Township, Bridge
    12             Painting                                      215,000
    13             (Base Construction Allocation -
    14             $200,000)
    15             (Design and Contingencies - $15,000)
    16         (12)  SR 0119, Bypass Steel Bridge No.9
    17             over SR 1003, White Township, Bridge
    18             Painting                                      200,000
    19             (Base Construction Allocation -
    20             $185,000)
    21             (Design and Contingencies - $15,000)
    22         (13)  SR 0119, Bypass Steel Bridge No.10
    23             over SR 1003, White Township, Bridge
    24             Painting                                      175,000
    25             (Base Construction Allocation -
    26             $160,000)
    27             (Design and Contingencies - $15,000)
    28         (14)  SR 0119, Bypass Steel Bridge No.11
    29             over SR 0110, White Township, Bridge
    30             Painting                                      125,000
    19990S0504B1471                 - 357 -

     1             (Base Construction Allocation -
     2             $110,000)
     3             (Design and Contingencies - $15,000)
     4         (15)  SR 0119, Bypass Steel Bridge No.12
     5             over SR 0110, White Township, Bridge
     6             Painting                                      125,000
     7             (Base Construction Allocation -
     8             $110,000)
     9             (Design and Contingencies - $15,000)
    10         (16)  SR 0217, Torrance Bridge over
    11             Conemaugh River, Burrell Township,
    12             Bridge Painting                               435,000
    13             (Base Construction Allocation -
    14             $420,000)
    15             (Design and Contingencies - $15,000)
    16         (17)  SR 0217, Blacklick Creek Bridge over
    17             Blacklick Creek, Burrell Township,
    18             Bridge Painting                               400,000
    19             (Base Construction Allocation -
    20             $385,000)
    21             (Design and Contingencies - $15,000)
    22         (18)  SR 0259, Heshbon Bridge over
    23             Blacklick Creek, West Wheatfield
    24             Township, Bridge Painting                     200,000
    25             (Base Construction Allocation -
    26             $185,000)
    27             (Design and Contingencies - $15,000)
    28         (19)  SR 0286, Clymer Bridge over Twolick
    29             Creek, Clymer Borough, Bridge Painting        175,000
    30             (Base Construction Allocation -
    19990S0504B1471                 - 358 -

     1             $160,000)
     2             (Design and Contingencies - $15,000)
     3         (20)  SR 0422, Twolick Eastbound Bridge
     4             over Twolick Creek, White Township,
     5             Bridge Painting                               360,000
     6             (Base Construction Allocation -
     7             $345,000)
     8             (Design and Contingencies - $15,000)
     9         (21)  SR 0422, Twolick Westbound Bridge
    10             over Twolick Creek, White Township,
    11             Bridge Painting                               360,000
    12             (Base Construction Allocation -
    13             $345,000)
    14             (Design and Contingencies - $15,000)
    15         (22)  SR 0422, Penn Run Exit Bridge
    16             Eastbound over TR 840, White Township,
    17             Bridge Painting                               190,000
    18             (Base Construction Allocation -
    19             $175,000)
    20             (Design and Contingencies - $15,000)
    21         (23)  SR 0422, Penn Run Exit Bridge
    22             Westbound over TR 840, White Township,
    23             Bridge Painting                               190,000
    24             (Base Construction Allocation -
    25             $175,000)
    26             (Design and Contingencies - $15,000)
    27         (24)  SR 0580, Cush Cushion Creek Bridge
    28             over Cush Cushion Creek, Green
    29             Township, Bridge Painting                      85,000
    30             (Base Construction Allocation -
    19990S0504B1471                 - 359 -

     1             $70,000)
     2             (Design and Contingencies - $15,000)
     3         (25)  SR 0954, Yellow Creek Bridge over
     4             Yellow Creek, White Township, Bridge
     5             Painting                                      125,000
     6             (Base Construction Allocation -
     7             $110,000)
     8             (Design and Contingencies - $15,000)
     9         (26)  SR 0954, Creekside Bridge over
    10             Crooked Creek, White Township, Bridge
    11             Painting                                      125,000
    12             (Base Construction Allocation -
    13             $110,000)
    14             (Design and Contingencies - $15,000)
    15         (27)  SR 0954, South Branch Bridge over
    16             South Branch of Plum Creek, Washington
    17             Township, Bridge Painting                      75,000
    18             (Base Construction Allocation -
    19             $60,000)
    20             (Design and Contingencies - $15,000)
    21         (28)  SR 1004, Philadelphia Street Exit
    22             Bridge over SR 0119, White Township,
    23             Bridge Painting                               235,000
    24             (Base Construction Allocation -
    25             $220,000)
    26             (Design and Contingencies - $15,000)
    27         (29)  SR 1006, Jimmy Stewart Airport Bridge
    28             over SR 0119, White Township, Bridge
    29             Painting                                      245,000
    30             (Base Construction Allocation -
    19990S0504B1471                 - 360 -

     1             $230,000)
     2             (Design and Contingencies - $15,000)
     3         (30)  SR 1007, Tanoma Bridge over Crooked
     4             Creek, Rayne Township, Bridge Painting         75,000
     5             (Base Construction Allocation -
     6             $60,000)
     7             (Design and Contingencies - $15,000)
     8         (31)  SR 1014, Diamondville Bridge over
     9             North Branch of Twolick Creek, Green
    10             Township, Bridge Painting                      75,000
    11             (Base Construction Allocation -
    12             $60,000)
    13             (Design and Contingencies - $15,000)
    14         (32)  SR 1017, Pine Flats Bridge over South
    15             Branch of Twolick Creek, Green
    16             Township, Bridge Painting                      95,000
    17             (Base Construction Allocation -
    18             $80,000)
    19             (Design and Contingencies - $15,000)
    20         (33)  SR 1033, Gypsy Bridge over Cush
    21             Creek, Montgomery Township, Bridge
    22             Painting                                       85,000
    23             (Base Construction Allocation -
    24             $70,000)
    25             (Design and Contingencies - $15,000)
    26         (34)  SR 1034, Lower Wilgus Bridge over
    27             Branch of Cush Creek, Montgomery
    28             Township, Bridge Painting                      55,000
    29             (Base Construction Allocation -
    30             $40,000)
    19990S0504B1471                 - 361 -

     1             (Design and Contingencies - $15,000)
     2         (35)  SR 1038, Crooked Run Bridge over
     3             Crooked Run, East Mahoning Township,
     4             Bridge Painting                                60,000
     5             (Base Construction Allocation -
     6             $45,000)
     7             (Design and Contingencies - $15,000)
     8         (36)  SR 1045, Broadhead Run Bridge over
     9             Broadhead Run, Canoe Township, Bridge
    10             Painting                                       70,000
    11             (Base Construction Allocation -
    12             $55,000)
    13             (Design and Contingencies - $15,000)
    14         (37)  SR 1045, Juneau Bridge over Canoe
    15             Creek, Canoe Township, Bridge Painting         75,000
    16             (Base Construction Allocation -
    17             $60,000)
    18             (Design and Contingencies - $15,000)
    19         (38)  SR 1046, Straight Run Bridge over
    20             Straight Run, Banks Township, Bridge
    21             Painting                                       80,000
    22             (Base Construction Allocation -
    23             $65,000)
    24             (Design and Contingencies - $15,000)
    25         (39)  SR 2019, Tearing Run Bridge No.1 over
    26             Tearing Run, Center Township, Bridge
    27             Painting                                       55,000
    28             (Base Construction Allocation -
    29             $40,000)
    30             (Design and Contingencies - $15,000)
    19990S0504B1471                 - 362 -

     1         (40)  SR 2019, Tearing Run Bridge No.2 over
     2             Tearing Run, Center Township, Bridge
     3             Painting                                       65,000
     4             (Base Construction Allocation -
     5             $50,000)
     6             (Design and Contingencies - $15,000)
     7         (41)  SR 3003, Tunnelton Bridge over
     8             Conemaugh River, Conemaugh Township,
     9             Bridge Painting                               525,000
    10             (Base Construction Allocation -
    11             $510,000)
    12             (Design and Contingencies - $15,000)
    13         (42)  SR 3007, Clarksburg Bridge over
    14             Blacklegs Creek, Conemaugh Township,
    15             Bridge Painting                               105,000
    16             (Base Construction Allocation -
    17             $90,000)
    18             (Design and Contingencies - $15,000)
    19         (43)  SR 3011, Blacklick Creek Bridge No.1
    20             over Blacklick Creek, Brush Valley
    21             Township, Bridge Painting                     405,000
    22             (Base Construction Allocation -
    23             $390,000)
    24             (Design and Contingencies - $15,000)
    25         (44)  SR 3011, Blacklick Creek Bridge No.2
    26             over Blacklick Creek, Blacklick
    27             Township, Bridge Painting                     405,000
    28             (Base Construction Allocation -
    29             $390,000)
    30             (Design and Contingencies - $15,000)
    19990S0504B1471                 - 363 -

     1         (45)  SR 3013, Muddy Run Bridge over Muddy
     2             Run, Blacklick Township, Bridge
     3             Painting                                       65,000
     4             (Base Construction Allocation -
     5             $50,000)
     6             (Design and Contingencies - $15,000)
     7         (46)  SR 3016, Homer City Bridge over
     8             Twolick Creek, Homer City Borough,
     9             Bridge Painting                               125,000
    10             (Base Construction Allocation -
    11             $110,000)
    12             (Design and Contingencies - $15,000)
    13         (47)  SR 3031, Blacklegs Run Bridge over
    14             Blacklegs Run, Young Township, Bridge
    15             Painting                                       65,000
    16             (Base Construction Allocation -
    17             $50,000)
    18             (Design and Contingencies - $15,000)
    19         (48)  SR 3037, Walker Run Bridge over
    20             Walker Run, Armstrong Township, Bridge
    21             Painting                                       55,000
    22             (Base Construction Allocation -
    23             $40,000)
    24             (Design and Contingencies - $15,000)
    25         (49)  SR 3039, Anthony Run Bridge over
    26             Anthony Run, Armstrong Township, Bridge
    27             Painting                                       55,000
    28             (Base Construction Allocation -
    29             $40,000)
    30             (Design and Contingencies - $15,000)
    19990S0504B1471                 - 364 -

     1         (50)  SR 4001, Fisher Siding Bridge over
     2             Crooked Creek, Armstrong Township,
     3             Bridge Painting                               110,000
     4             (Base Construction Allocation -
     5             $95,000)
     6             (Design and Contingencies - $15,000)
     7         (51)  SR 4001, Five Points Bridge over
     8             South Branch of Plum Creek, Washington
     9             Township, Bridge Painting                     100,000
    10             (Base Construction Allocation -
    11             $85,000)
    12             (Design and Contingencies - $15,000)
    13         (52)  SR 4006, Reddings Run Bridge over
    14             Reddings Run, Washington Township,
    15             Bridge Painting                                55,000
    16             (Base Construction Allocation -
    17             $40,000)
    18             (Design and Contingencies - $15,000)
    19         (53)  SR 4008, Kimmel Station Bridge No.1
    20             over Branch of Crooked Creek, Rayne
    21             Township, Bridge Painting                      50,000
    22             (Base Construction Allocation -
    23             $35,000)
    24             (Design and Contingencies - $15,000)
    25         (54)  SR 4008, Kimmel Station Bridge No.2
    26             over Branch of Crooked Creek, Rayne
    27             Township, Bridge Painting                      50,000
    28             (Base Construction Allocation -
    29             $35,000)
    30             (Design and Contingencies - $15,000)
    19990S0504B1471                 - 365 -

     1         (55)  SR 4035, Plumville Bridge over Plum
     2             Creek, Plumville Borough, Bridge
     3             Painting                                       75,000
     4             (Base Construction Allocation -
     5             $60,000)
     6             (Design and Contingencies - $15,000)
     7         (56)  SR 0056, Seward Conrail Overpass,
     8             East Wheatfield Township, Bridge
     9             Replacement                                 2,570,000
    10             (Base Construction Allocation -
    11             $2,080,000)
    12             (Land Allocation - $150,000)
    13             (Design and Contingencies - $340,000)
    14         (57)  SR 0119, Two Lick Creek Bridge over
    15             Big Two Lick Creek, Center Township,
    16             Bridge Rehabilitation                       1,450,000
    17             (Base Construction Allocation -
    18             $1,000,000)
    19             (Land Allocation - $100,000)
    20             (Design and Contingencies - $350,000)
    21         (58)  SR 0119, Bridge over PA 840, Center
    22             Township, Bridge Rehabilitation             1,450,000
    23             (Base Construction Allocation -
    24             $1,000,000)
    25             (Land Allocation - $100,000)
    26             (Design and Contingencies - $350,000)
    27         (59)  SR 0119, Yellow Creek Bridge over
    28             Yellow Creek, Center Township, Bridge
    29             Rehabilitation                              1,450,000
    30             (Base Construction Allocation -
    19990S0504B1471                 - 366 -

     1             $1,000,000)
     2             (Land Allocation - $100,000)
     3             (Design and Contingencies - $350,000)
     4         (60)  SR 0119, Pickering Creek Bridge over
     5             Pickering Creek, East Mahoning
     6             Township, Bridge Rehabilitation             1,450,000
     7             (Base Construction Allocation -
     8             $1,000,000)
     9             (Land Allocation - $100,000)
    10             (Design and Contingencies - $350,000)
    11         (61)  SR 0119, Northbound Bridge over PA
    12             110, Rayne Township, Bridge
    13             Rehabilitation                              1,450,000
    14             (Base Construction Allocation -
    15             $1,000,000)
    16             (Land Allocation - $100,000)
    17             (Design and Contingencies - $350,000)
    18         (62)  SR 0119, Southbound Bridge over PA
    19             110, Payne Township, Bridge
    20             Rehabilitation                              1,450,000
    21             (Base Construction Allocation -
    22             $1,000,000)
    23             (Land Allocation - $100,000)
    24             (Design and Contingencies - $350,000)
    25         (63)  SR 0119, Pine Run Bridge No.1 over
    26             Pine Run, Rayne Township, Bridge
    27             Rehabilitation                              1,450,000
    28             (Base Construction Allocation -
    29             $1,000,000)
    30             (Land Allocation - $100,000)
    19990S0504B1471                 - 367 -

     1             (Design and Contingencies - $350,000)
     2         (64)  SR 0119, Pine Run Bridge No.2 over
     3             Pine Run, Rayne Township, Bridge
     4             Rehabilitation                              1,450,000
     5             (Base Construction Allocation -
     6             $1,000,000)
     7             (Land Allocation - $100,000)
     8             (Design and Contingencies - $350,000)
     9         (65)  SR 0119, Northbound Bridge over US
    10             422, White Township, Bridge
    11             Rehabilitation                              1,450,000
    12             (Base Construction Allocation -
    13             $1,000,000)
    14             (Land Allocation - $100,000)
    15             (Design and Contingencies - $350,000)
    16         (66)  SR 0119, Southbound Bridge over US
    17             422, White Township, Bridge
    18             Rehabilitation                              1,450,000
    19             (Base Construction Allocation -
    20             $1,000,000)
    21             (Land Allocation - $100,000)
    22             (Design and Contingencies - $350,000)
    23         (67)  SR 0119, Southbound Bridge over PA
    24             268, White Township, Bridge
    25             Rehabilitation                              1,450,000
    26             (Base Construction Allocation -
    27             $1,000,000)
    28             (Land Allocation - $100,000)
    29             (Design and Contingencies - $350,000)
    30         (68)  SR 0119, Northbound Bridge over SR
    19990S0504B1471                 - 368 -

     1             0268, White Township, Bridge
     2             Rehabilitation                              1,450,000
     3             (Base Construction Allocation -
     4             $1,000,000)
     5             (Land Allocation - $100,000)
     6             (Design and Contingencies - $350,000)
     7         (69) SR 0119, Northbound Bridge over SR
     8             1002, White Township, Bridge
     9             Rehabilitation                              1,450,000
    10             (Base Construction Allocation -
    11             $1,000,000)
    12             (Land Allocation - $100,000)
    13             (Design & Contingencies - $350,000)
    14         (70)  SR 0119, Southbound Bridge over SR
    15             1002, White Township, Bridge
    16             Rehabilitation                               1450,000
    17             (Base Construction Allocation -
    18             $1,000,000)
    19             (Land Allocation - $100,000)
    20             (Design and Contingencies - $350,000)
    21         (71)  SR 0119, Northbound Bridge over SR
    22             1113 Ramp, White Township, Bridge
    23             Rehabilitation                              1,450,000
    24             (Base Construction Allocation -
    25             $1,000,000)
    26             (Land Allocation - $100,000)
    27             (Design and Contingencies - $350,000)
    28         (72)  SR 0119, Southbound Bridge over SR
    29             1113 Ramp, White Township, Bridge
    30             Rehabilitation                              1,450,000
    19990S0504B1471                 - 369 -

     1             (Base Construction Allocation -
     2             $1,000,000)
     3             (Land Allocation - $100,000)
     4             (Design and Contingencies - $350,000)
     5         (73) SR 0286, Westbound Bridge over SR
     6             1004, White Township, Bridge
     7             Rehabilitation                              1,050,000
     8             (Base Construction Allocation -
     9             $750,000)
    10             (Land Allocation - $50,000)
    11             (Design and Contingencies - $250,000)
    12         (74)  SR 0422, Cheese Run Bridge over
    13             Cheese Run, Armstrong Township, Bridge
    14             Replacement                                 1,450,000
    15             (Base Construction Allocation -
    16             $1,000,000)
    17             (Land Allocation - $100,000)
    18             (Design and Contingencies - $350,000)
    19         (75)  SR 0422, Crooked Creek Bridge over
    20             Crooked Creek, Armstrong Township,
    21             Bridge Rehabilitation                       1,450,000
    22             (Base Construction Allocation -
    23             $1,000,000)
    24             (Land Allocation - $100,000)
    25             (Design and Contingencies - $350,000)
    26         (76)  SR 0422, Crooked Creek Bridge No.2
    27             over Branch Crooked Creek, Armstrong
    28             Township, Bridge Rehabilitation             1,450,000
    29             (Base Construction Allocation -
    30             $1,000,000)
    19990S0504B1471                 - 370 -

     1             (Land Allocation - $100,000)
     2             (Design and Contingencies - $350,000)
     3         (77)  SR 0422, Curry Run Bridge No.1 over
     4             Curry Run, Armstrong Township, Bridge
     5             Rehabilitation                              1,450,000
     6             (Base Construction Allocation -
     7             $1,000,000)
     8             (Land Allocation - $100,000)
     9             (Design and Contingencies - $350,000)
    10         (78)  SR 0422, Curry Run Bridge No.2 over
    11             Curry Run, Armstrong Township, Bridge
    12             Rehabilitation                              1,450,000
    13             (Base Construction Allocation -
    14             $1,000,000)
    15             (Land Allocation - $100,000)
    16             (Design and Contingencies - $350,000)
    17         (79)  SR 0422, Curry Run Bridge No.3 over
    18             Curry Run, Armstrong Township, Bridge
    19             Rehabilitation                              1,450,000
    20             (Base Construction Allocation -
    21             $1,000,000)
    22             (Land Allocation - $100,000)
    23             (Design and Contingencies - $350,000)
    24         (80) SR 0422, Curry Run Bridge No.4 over
    25             Branch of Curry Run, Armstrong
    26             Township, Bridge Rehabilitation             1,450,000
    27             (Base Construction Allocation -
    28             $1,000,000)
    29             (Land Allocation - $100,000)
    30             (Design and Contingencies - $350,000)
    19990S0504B1471                 - 371 -

     1         (81)  SR 0422, Laurel Run Bridge over
     2             Laurel Run, Armstrong Township, Bridge
     3             Rehabilitation                              1,450,000
     4             (Base Construction Allocation -
     5             $1,000,000)
     6             (Land Allocation - $100,000)
     7             (Design and Contingencies - $350,000)
     8         (82)  SR 0422, Westbound Bridge over PA
     9             840, Cherryhill Township, Bridge
    10             Rehabilitation                              1,450,000
    11             (Base Construction Allocation -
    12             $1,000,000)
    13             (Land Allocation - $100,000)
    14             (Design and Contingencies - $350,000)
    15         (83)  SR 0422, Eastbound Bridge over PA
    16             840, Cherryhill Township, Bridge
    17             Rehabilitation                              1,450,000
    18             (Base Construction Allocation -
    19             $1,000,000)
    20             (Land Allocation - $100,000)
    21             (Design and Contingencies - $350,000)
    22         (84)  SR 0422, Little Yellow Creek Bridge
    23             over Little Yellow Creek, Pine
    24             Township, Bridge Rehabilitation             1,450,000
    25             (Base Construction Allocation -
    26             $1,000,000)
    27             (Land Allocation - $100,000)
    28             (Design and Contingencies - $350,000)
    29         (85)  SR 0422, Bridge over Branch of Little
    30             Yellow Creek, Pine Township, Bridge
    19990S0504B1471                 - 372 -

     1             Rehabilitation                              1,450,000
     2             (Base Construction Allocation -
     3             $1,000,000)
     4             (Land Allocation - $100,000)
     5             (Design and Contingencies - $350,000)
     6         (86)  SR 0422, Westbound Bridge over PA
     7             954, White Township, Bridge
     8             Replacement                                 1,450,000
     9             (Base Construction Allocation -
    10             $1,000,000)
    11             (Land Allocation - $100,000)
    12             (Design and Contingencies - $350,000)
    13         (87)  SR 0422, Eastbound Bridge over PA
    14             954, White Township, Bridge
    15             Rehabilitation                              1,450,000
    16             (Base Construction Allocation -
    17             $1,000,000)
    18             (Land Allocation - $100,000)
    19             (Design and Contingencies - $350,000)
    20         (88)  SR 1012, Diamondville Bridge over Two
    21             Lick Creek, Cherryhill Township, Bridge
    22             Replacement                                 1,250,000
    23             (Base Construction Allocation -
    24             $1,000,000)
    25             (Land Allocation - $50,000)
    26             (Design and Contingencies - $200,000)
    27         (89)  SR 6422, McCarthy Run Bridge over
    28             Branch of McCarthy Run, White Township,
    29             Bridge Rehabilitation                       1,450,000
    30             (Base Construction Allocation -
    19990S0504B1471                 - 373 -

     1             $1,000,000)
     2             (Land Allocation - $100,000)
     3             (Design and Contingencies - $350,000)
     4         (90)  SR 6422, Bridge over Tributary of
     5             McCarthy Run, White Township, Bridge
     6             Rehabilitation                              1,450,000
     7             (Base Construction Allocation -
     8             $1,000,000)
     9             (Land Allocation - $100,000)
    10             (Design and Contingencies - $350,000)
    11         (91)  SR 0119, Steel Railroad Bridge No.15
    12             over PA 954, White Township, Bridge
    13             Painting                                       51,000
    14             (Base Construction Allocation -
    15             $45,000)
    16             (Design and Contingencies - $6,000)
    17         (92)  SR 0422, Penn Run Exit Bridge
    18             Eastbound over TR 845, Cherryhill
    19             Township, Bridge Painting                      61,000
    20             (Base Construction Allocation -
    21             $55,000)
    22             (Design and Contingencies - $6,000)
    23         (93)  SR 0422, Penn Run Exit Bridge
    24             Westbound over TR 845, Cherryhill
    25             Township, Bridge Painting                      46,000
    26             (Base Construction Allocation -
    27             $40,000)
    28             (Design and Contingencies - $6,000)
    29         (94)  SR 1044, Bridge over Big Canoe Creek,
    30             Canoe Township, Bridge Replacement            195,000
    19990S0504B1471                 - 374 -

     1             (Base Construction Allocation -
     2             $110,000)
     3             (Land Allocation - $10,000)
     4             (Design and Contingencies - $75,000)
     5         (95)  SR 1047, Bridge over Big Canoe Creek,
     6             Canoe Township, Bridge Replacement            205,000
     7             (Base Construction Allocation -
     8             $120,000)
     9             (Land Allocation - $10,000)
    10             (Design and Contingencies - $75,000)
    11         (96)  SR 4006, Bridge over Plum Creek,
    12             South Mahoning Township, Bridge
    13             Replacement                                   205,000
    14             (Base Construction Allocation -
    15             $120,000)
    16             (Land Allocation - $10,000)
    17             (Design and Contingencies - $75,000)
    18  Section 37.  Jefferson County.
    19     (a)  Local Bridges
    20         (1)  Summerville Borough, County Bridge 40-
    21             A, Anderson Road Bridge over Runaway
    22             Run, Bridge Rehabilitation                    415,000
    23             (Base Construction Allocation -
    24             $345,000)
    25             (Land Allocation - $10,000)
    26             (Design and Contingencies - $60,000)
    27         (2)  Sykesville Borough, Station Street
    28             Bridge over Stump Creek, Bridge
    29             Replacement                                   570,000
    30             (Base Construction Allocation -
    19990S0504B1471                 - 375 -

     1             $500,000)
     2             (Land Allocation - $10,000)
     3             (Design and Contingencies - $60,000)
     4         (3)  Eldred Township, T-346 over Mill
     5             Creek, Bridge Replacement                     420,000
     6             (Base Construction Allocation -
     7             $330,000)
     8             (Land Allocation - $10,000)
     9             (Design and Contingencies - $80,000)
    10         (4)  Eldred Township, T-353 over Mill Run,
    11             Bridge Replacement                            245,000
    12             (Base Construction Allocation -
    13             $200,000)
    14             (Land Allocation - $10,000)
    15             (Design and Contingencies - $35,000)
    16         (5)  Oliver Township, T-718 over Little
    17             Sandy Creek, Bridge Replacement               490,000
    18             (Base Construction Allocation -
    19             $400,000)
    20             (Land Allocation - $10,000)
    21             (Design and Contingencies - $80,000)
    22         (6)  Union Township, T-320 over Little Mill
    23             Creek, Bridge Replacement                     245,000
    24             (Base Construction Allocation -
    25             $200,000)
    26             (Land Allocation - $10,000)
    27             (Design and Contingencies - $35,000)
    28         (7)  Union Township, T-321 over Runaway
    29             Run, Bridge Replacement                       145,000
    30             (Base Construction Allocation -
    19990S0504B1471                 - 376 -

     1             $100,000)
     2             (Land Allocation - $5,000)
     3             (Design and Contingencies - $40,000)
     4         (8)  Young Township, T-632, Bridge No.JC-36
     5             over Saw Mill Run, Bridge Replacement         330,000
     6             (Base Construction Allocation -
     7             $270,000)
     8             (Design and Contingencies - $60,000)
     9         (9)  Oliver Township, T-380, County Bridge
    10             No.22 over Hadden Run, Bridge
    11             Replacement                                   520,000
    12         (10)  Henderson Township, T-519, County
    13             Bridge No.7 over Big Run, Bridge
    14             Replacement                                   595,000
    15         (11)  Pine Creek Township, T-464, County
    16             Bridge No.17 over Little Mill Creek,
    17             Bridge Replacement                            480,000
    18         (12)  Pine Creek Township, T-452, County
    19             Bridge No.16 over Little Mill Creek,
    20             Bridge Replacement                            360,000
    21         (13)  Winslow Township, T-542, County
    22             Bridge No.10 over Sandy Lick Creek,
    23             Bridge Replacement                            925,000
    24         (14)  Eldred Township, T-346, Mill Creek
    25             Bridge over Mill Creek, Bridge
    26             Replacement                                   420,000
    27             (Base Construction Allocation -
    28             $330,000)
    29             (Land Allocation - $10,000)
    30             (Design and Contingencies - $80,000)
    19990S0504B1471                 - 377 -

     1         (15)  Eldred Township, T-353, Culvert over
     2             Mill Creek, Bridge Replacement                195,000
     3             (Base Construction Allocation -
     4             $150,000)
     5             (Land Allocation - $10,000)
     6             (Design and Contingencies - $35,000)
     7         (16)  Oliver Township, T-718, Little Sandy
     8             Creek Bridge over Little Sandy Creek,
     9             Bridge Replacement                            490,000
    10             (Base Construction Allocation -
    11             $400,000)
    12             (Land Allocation - $10,000)
    13             (Design and Contingencies - $80,000)
    14         (17)  Reynoldsville Borough, Point View
    15             Avenue Bridge over Conrail, Bridge
    16             Replacement                                   580,000
    17             (Base Construction Allocation -
    18             $500,000)
    19             (Land Allocation - $10,000)
    20             (Design and Contingencies - $70,000)
    21         (18)  Union Township and Eldred Township,
    22             T-342, Mill Creek Bridge over Mill
    23             Creek, Bridge Replacement                     490,000
    24             (Base Construction Allocation -
    25             $400,000)
    26             (Land Allocation - $10,000)
    27             (Design and Contingencies - $80,000)
    28         (19)  Young Township, T-632, Culvert over
    29             Saw Mill Run, Bridge Replacement              310,000
    30             (Base Construction Allocation -
    19990S0504B1471                 - 378 -

     1             $250,000)
     2             (Land Allocation - $10,000)
     3             (Design and Contingencies - $50,000)
     4     (b)  State Bridges
     5         (1)  SR 3033, T-830, Knox No.1 Bridge over
     6             Swamp Run, Knox Township, Bridge
     7             Replacement                                   446,000
     8             (Base Construction Allocation -
     9             $376,000)
    10             (Land Allocation - $10,000)
    11             (Design and Contingencies - $60,000)
    12         (2)  SR 0036, Sawmill Run Bridge over
    13             Sawmill Run, Punxsutawney Borough,
    14             Bridge Painting                                60,000
    15             (Base Construction Allocation -
    16             $45,000)
    17             (Design and Contingencies - $15,000)
    18         (3)  SR 0119, Punxsutawney Bridge over
    19             Mahoning Creek, Punxsutawney Borough,
    20             Bridge Painting                               250,000
    21             (Base Construction Allocation -
    22             $235,000)
    23             (Design and Contingencies - $15,000)
    24         (4)  SR 0410, Beaver Run Bridge over Beaver
    25             Run, Henderson Township, Bridge
    26             Painting                                       55,000
    27             (Base Construction Allocation -
    28             $40,000)
    29             (Design and Contingencies - $15,000)
    30         (5)  SR 0830, Falls Creek Bridge over Falls
    19990S0504B1471                 - 379 -

     1             Creek, Falls Creek Township, Bridge
     2             Painting                                       80,000
     3             (Base Construction Allocation -
     4             $65,000)
     5             (Design and Contingencies - $15,000)
     6         (6)  SR 0949, Corsica Exit Bridge over I-
     7             80, Union Township, Bridge Painting           205,000
     8             (Base Construction Allocation -
     9             $190,000)
    10             (Design and Contingencies - $15,000)
    11         (7)  SR 1009, Kyle's Run Bridge over Kyle's
    12             Run, Washington Township, Bridge
    13             Painting                                       60,000
    14             (Base Construction Allocation -
    15             $45,000)
    16             (Design and Contingencies - $15,000)
    17         (8)  SR 1027, Egypt Bridge over North Fork
    18             Creek, Rock Township, Bridge Painting         125,000
    19             (Base Construction Allocation -
    20             $110,000)
    21             (Design and Contingencies - $15,000)
    22         (9)  SR 2007, Clover Run Bridge over Clover
    23             Run, Gaskill Township, Bridge Painting         95,000
    24             (Base Construction Allocation -
    25             $80,000)
    26             (Design and Contingencies - $15,000)
    27         (10)  SR 2008, Stump Creek Bridge over
    28             Stump Creek, Henderson Township, Bridge
    29             Painting                                      100,000
    30             (Base Construction Allocation -
    19990S0504B1471                 - 380 -

     1             $85,000)
     2             (Design and Contingencies - $15,000)
     3         (11)  SR 2023, Anita Bridge over Elk Run,
     4             McCalmont Township, Bridge Painting            60,000
     5             (Base Construction Allocation -
     6             $45,000)
     7             (Design and Contingencies - $15,000)
     8         (12)  SR 2023, Charcoal Plant Bridge over
     9             Sandy Lick Creek, Pine Creek Township,
    10             Bridge Painting                               125,000
    11             (Base Construction Allocation -
    12             $110,000)
    13             (Design and Contingencies - $15,000)
    14         (13)  SR 3003, Baxter Bridge over Redbank
    15             Creek, Clover Township, Bridge
    16             Painting                                      235,000
    17             (Base Construction Allocation -
    18             $220,000)
    19             (Design and Contingencies - $15,000)
    20         (14)  SR 4006, North Fork Creek Bridge over
    21             North Fork Creek, Warsaw Township,
    22             Bridge Painting                               110,000
    23             (Base Construction Allocation -
    24             $95,000)
    25             (Design and Contingencies - $15,000)
    26         (15)  SR 0310, Bridge over Branch of Trout
    27             Run, Winslow Township, Bridge
    28             Replacement                                   490,000
    29             (Base Construction Allocation -
    30             $350,000)
    19990S0504B1471                 - 381 -

     1             (Land Allocation - $20,000)
     2             (Design and Contingencies - $120,000)
     3         (16)  SR 3018, Bridge over Little Sandy
     4             Creek, Limestone Township, Bridge
     5             Replacement                                   670,000
     6             (Base Construction Allocation -
     7             $500,000)
     8             (Land Allocation - $20,000)
     9             (Design and Contingencies - $150,000)
    10         (17)  SR 0028, Knapp Run Bridge over Knapp
    11             Run, Clover Township, Bridge
    12             Rehabilitation                              1,450,000
    13             (Base Construction Allocation -
    14             $1,000,000)
    15             (Land Allocation - $100,000)
    16             (Design and Contingencies - $350,000)
    17         (18)  SR 0028, Coder Run Bridge over Coder
    18             Run, Rose Township, Bridge
    19             Rehabilitation                              1,450,000
    20             (Base Construction Allocation -
    21             $1,000,000)
    22             (Land Allocation - $100,000)
    23             (Design and Contingencies - $350,000)
    24         (19)  SR 0028, Mill Creek Bridge over Mill
    25             Creek, Snyder Township, Bridge
    26             Rehabilitation                              1,050,000
    27             (Base Construction Allocation -
    28             $750,000)
    29             (Land Allocation - $50,000)
    30             (Design and Contingencies - $250,000)
    19990S0504B1471                 - 382 -

     1         (20)  SR 0028, Redbank Creek Bridge over
     2             Tributary of Redbank Creek, Summerville
     3             Borough, Bridge Rehabilitation              1,450,000
     4             (Base Construction Allocation -
     5             $1,000,000)
     6             (Land Allocation - $100,000)
     7             (Design and Contingencies - $350,000)
     8         (21)  SR 0028, Seneca Run Bridge over
     9             Seneca Run, Warsaw Township, Bridge
    10             Rehabilitation                              1,050,000
    11             (Base Construction Allocation -
    12             $750,000)
    13             (Land Allocation - $50,000)
    14             (Design and Contingencies - $250,000)
    15         (22)  SR 0080, I-80 Bridge Westbound over
    16             PA 36, Brookville Borough, Bridge
    17             Rehabilitation                              1,450,000
    18             (Base Construction Allocation -
    19             $1,000,000)
    20             (Land Allocation - $100,000)
    21             (Design and Contingencies - $350,000)
    22         (23)  SR 0080, I-80 Bridge Eastbound over
    23             PA 36, Brookville Borough, Bridge
    24             Rehabilitation                              1,450,000
    25             (Base Construction Allocation -
    26             $1,000,000)
    27             (Land Allocation - $100,000)
    28             (Design and Contingencies - $350,000)
    29         (24)  SR 0080, I-80 Bridge over PA 28, Pine
    30             Creek Township, Bridge Rehabilitation       1,450,000
    19990S0504B1471                 - 383 -

     1             (Base Construction Allocation -
     2             $1,000,000)
     3             (Land Allocation - $100,000)
     4             (Design and Contingencies - $350,000)
     5         (25)  SR 0080, I-80 Bridge over Little Mill
     6             Creek, Pine Creek Township, Bridge
     7             Rehabilitation                              1,450,000
     8             (Base Construction Allocation -
     9             $1,000,000)
    10             (Land Allocation - $100,000)
    11             (Design and Contingencies - $350,000)
    12         (26)  SR 0080, I-80 Bridge over Mill Creek,
    13             Pine Creek Township, Bridge
    14             Rehabilitation                              1,450,000
    15             (Base Construction Allocation -
    16             $1,000,000)
    17             (Land Allocation - $100,000)
    18             (Design and Contingencies - $350,000)
    19         (27)  SR 0119, Rock Run Bridge over Rock
    20             Run, Bell Township, Bridge
    21             Rehabilitation                              1,450,000
    22             (Base Construction Allocation -
    23             $1,000,000)
    24             (Land Allocation - $100,000)
    25             (Design and Contingencies - $350,000)
    26         (28)  SR 0119, Stump Creek Bridge over
    27             Branch of Stump Creek, Henderson
    28             Township, Bridge Rehabilitation             1,450,000
    29             (Base Construction Allocation -
    30             $1,000,000)
    19990S0504B1471                 - 384 -

     1             (Land Allocation - $100,000)
     2             (Design and Contingencies - $350,000)
     3         (29)  SR 0119, Punxsutawney Bridge over
     4             Mahoning Creek, Punxsutawney Borough,
     5             Bridge Replacement                          2,400,000
     6             (Base Construction Allocation -
     7             $2,000,000)
     8             (Land Allocation - $50,000)
     9             (Design and Contingencies - $350,000)
    10         (30)  SR 0119, Rock Run Bridge over Rock
    11             Run, Sykesville Borough, Bridge
    12             Rehabilitation                              1,450,000
    13             (Base Construction Allocation -
    14             $1,000,000)
    15             (Land Allocation - $100,000)
    16             (Design and Contingencies - $350,000)
    17         (31)  SR 0119, Sugar Camp Run Bridge over
    18             Sugar Camp Run, Sykesville Borough,
    19             Bridge Rehabilitation                       1,450,000
    20             (Base Construction Allocation -
    21             $1,000,000)
    22             (Land Allocation - $100,000)
    23             (Design and Contingencies - $350,000)
    24         (32)  SR 3003, Baxter Bridge over Red Bank
    25             Creek, Clover Township, Bridge
    26             Rehabilitation                                350,000
    27             (Base Construction Allocation -
    28             $320,000)
    29             (Design and Contingencies - $30,000)
    30         (33)  SR 3005, Worthville Bridge over
    19990S0504B1471                 - 385 -

     1             Little Sandy Creek, Beaver Township,
     2             Bridge Painting                               115,000
     3             (Base Construction Allocation -
     4             $100,000)
     5             (Design and Contingencies - $15,000)
     6         (34)  SR 3007, Summerville Borough Bridge
     7             over Red Bank Creek, Summerville
     8             Borough, Bridge Replacement                 1,730,000
     9             (Base Construction Allocation -
    10             $1,500,000)
    11             (Land Allocation - $80,000)
    12             (Design and Contingencies - $150,000)
    13         (35)  SR 3008, Perryville Run Bridge over
    14             Perryville Run, Perry Township, Bridge
    15             Painting                                       65,000
    16             (Base Construction Allocation -
    17             $50,000)
    18             (Design and Contingencies - $15,000)
    19         (36)  SR 3008, Horatio Bridge over Branch
    20             of Mahoning Creek, Perry Township,
    21             Bridge Painting                                55,000
    22             (Base Construction Allocation -
    23             $40,000)
    24             (Design and Contingencies - $15,000)
    25         (37)  SR 3013, Valier Truss Bridge over
    26             Mahoning Creek, Perry Township, Bridge
    27             Painting                                      700,000
    28             (Base Construction Allocation -
    29             $600,000)
    30             (Design and Contingencies - $100,000)
    19990S0504B1471                 - 386 -

     1         (38)  SR 3014, Sprankle Mills Bridge over
     2             Big Run, Oliver Township, Bridge
     3             Painting                                      100,000
     4             (Base Construction Allocation -
     5             $85,000)
     6             (Design and Contingencies - $15,000)
     7         (39)  SR 3014, Worthville Bridge over
     8             Little Sandy Creek, Perry Township,
     9             Bridge Painting                               105,000
    10             (Base Construction Allocation -
    11             $90,000)
    12             (Design and Contingencies - $15,000)
    13         (40)  SR 3018, Coolspring Bridge over
    14             Little Sandy Creek, Oliver Township,
    15             Bridge Replacement                            670,000
    16             (Base Construction Allocation -
    17             $500,000)
    18             (Land Allocation - $20,000)
    19             (Design and Contingencies - $150,000)
    20         (41)  SR 3033, Fivemile Run Bridge over
    21             Fivemile Run, Brookville Borough,
    22             Bridge Replacement                            595,000
    23             (Base Construction Allocation -
    24             $400,000)
    25             (Land Allocation - $20,000)
    26             (Design and Contingencies - $175,000)
    27         (42)  SR 3039, Brookville Bridge No.2 over
    28             Fivemile Run, Brookville Borough,
    29             Bridge Replacement                            590,000
    30             (Base Construction Allocation -
    19990S0504B1471                 - 387 -

     1             $500,000)
     2             (Land Allocation - $30,000)
     3             (Design and Contingencies - $60,000)
     4         (43)  SR 4005, Richardsville Bridge over
     5             North Fork Creek, Warsaw Township,
     6             Bridge Replacement                            490,000
     7             (Base Construction Allocation -
     8             $400,000)
     9             (Land Allocation - $30,000)
    10             (Design and Contingencies - $60,000)
    11         (44)  SR 4005, Perkin Run Bridge over
    12             Perkin Run, Warsaw Township, Bridge
    13             Painting                                       65,000
    14             (Base Construction Allocation -
    15             $50,000)
    16             (Design and Contingencies - $15,000)
    17         (45)  SR 4005, Richardsville Bridge over
    18             North Fork Creek, Warsaw Township,
    19             Bridge Painting                                90,000
    20             (Base Construction Allocation -
    21             $75,000)
    22             (Design and Contingencies - $15,000)
    23         (46)  SR 1009, Bridge over Beaverdam Run,
    24             Washington Township, Bridge
    25             Replacement                                   205,000
    26             (Base Construction Allocation -
    27             $120,000)
    28             (Land Allocation - $10,000)
    29             (Design and Contingencies - $75,000)
    30         (47)  SR 2019, Bridge over Saw Mill Run,
    19990S0504B1471                 - 388 -

     1             Henderson Township, Bridge Replacement        205,000
     2             (Base Construction Allocation -
     3             $120,000)
     4             (Land Allocation - $10,000)
     5             (Design and Contingencies - $75,000)
     6         (48)  SR 2019, Desire Bridge over Big Run,
     7             McCalmont Township, Bridge Replacement        205,000
     8             (Base Construction Allocation -
     9             $120,000)
    10             (Land Allocation - $10,000)
    11             (Design and Contingencies - $75,000)
    12         (49)  SR 3014, Bridge over McCracken Run,
    13             Oliver Township, Bridge Rehabilitation        205,000
    14             (Base Construction Allocation -
    15             $120,000)
    16             (Land Allocation - $10,000)
    17             (Design and Contingencies - $75,000)
    18  Section 38.  Juniata County.
    19     (a)  Local Bridges
    20         (1)  Fayette Township, T-558 over West
    21             Branch of Cocolamus Creek, Bridge
    22             Rehabilitation                                 21,000
    23             (Base Construction Allocation -
    24             $18,000)
    25             (Design and Contingencies - $3,000)
    26         (2)  Fayette Township, T-602 over Little
    27             Lost Creek, Bridge Rehabilitation              19,000
    28             (Base Construction Allocation -
    29             $17,000)
    30             (Design and Contingencies - $2,000)
    19990S0504B1471                 - 389 -

     1         (3)  Delaware Township, T-471, Delaware
     2             Creek Bridge, Bridge Replacement              210,000
     3             (Base Construction Allocation -
     4             $150,000)
     5             (Land Allocation - $10,000)
     6             (Design and Contingencies - $50,000)
     7         (4)  Fermanagh Township, T-410, Lost Creek
     8             Bridge, Bridge Replacement                    640,000
     9             (Base Construction Allocation -
    10             $510,000)
    11             (Land Allocation - $10,000)
    12             (Design and Contingencies - $120,000)
    13         (5)  Milford Township, T-360, Licking Creek
    14             Bridge over Licking Creek, Bridge
    15             Rehabilitation                                350,000
    16             (Base Construction Allocation -
    17             $260,000)
    18             (Land Allocation - $10,000)
    19             (Design and Contingencies - $80,000)
    20         (6)  Susquehanna Township, T-315, Mahatango
    21             Bridge over Mahatango Creek, Bridge
    22             Replacement                                   370,000
    23             (Base Construction Allocation -
    24             $280,000)
    25             (Land Allocation - $10,000)
    26             (Design and Contingencies - $80,000)
    27         (7)  Tuscarora Township, Spectacle Gap
    28             Bridge over Spectacle Gap Run, Bridge
    29             Replacement                                    80,000
    30             (Base Construction Allocation -
    19990S0504B1471                 - 390 -

     1             $73,000)
     2             (Design and Contingencies - $7,000)
     3         (8)  Tuscarora Township, T-309, Tuscarora
     4             Creek Bridge, Bridge Replacement            1,200,000
     5             (Base Construction Allocation -
     6             $930,000)
     7             (Land Allocation - $20,000)
     8             (Design and Contingencies - $250,000)
     9         (9)  Tuscarora Township, T-387, Willow Run
    10             Bridge, Bridge Replacement                    370,000
    11             (Base Construction Allocation -
    12             $260,000)
    13             (Land Allocation - $10,000)
    14             (Design and Contingencies - $100,000)
    15     (b)  State Bridges
    16         (1)  SR 0850, Laurel Run Bridge over Laurel
    17             Run, Village of Honey Grove, Tuscarora
    18             Township, Bridge Replacement                  670,000
    19             (Base Construction Allocation -
    20             $500,000)
    21             (Land Allocation - $20,000)
    22             (Design and Contingencies - $150,000)
    23         (2)  SR 0850, Bridge over Tuscarora Creek,
    24             Tuscarora Township, Bridge
    25             Rehabilitation                                155,000
    26             (Base Construction Allocation -
    27             $150,000)
    28             (Design and Contingencies - $5,000)
    29         (3)  SR 0850, Bridge over Tuscarora Creek,
    30             Tuscarora Township, Bridge Replacement      1,420,000
    19990S0504B1471                 - 391 -

     1             (Base Construction Allocation -
     2             $1,280,000)
     3             (Land Allocation - $40,000)
     4             (Design and Contingencies - $100,000)
     5         (4)  SR 0035, Lost Creek Bridge over Lost
     6             Creek, Fayette Township, Bridge
     7             Replacement                                   795,000
     8             (Base Construction Allocation -
     9             $600,000)
    10             (Land Allocation - $10,000)
    11             (Design and Contingencies - $185,000)
    12         (5)  SR 0035, Juniata River Bridge over
    13             Juniata River, Mifflintown Borough,
    14             Bridge Replacement                          4,700,000
    15             (Base Construction Allocation -
    16             $4,000,000)
    17             (Land Allocation - $200,000)
    18             (Design and Contingencies - $500,000)
    19         (6)  SR 0075, Bridge over US 22, Walker
    20             Township, Bridge Painting                     810,000
    21             (Base Construction Allocation -
    22             $800,000)
    23             (Design & Contingencies - $10,000)
    24         (7)  SR 0333, Delaware Creek Bridge,
    25             Thompsontown Borough, Bridge
    26             Replacement                                   560,000
    27             (Base Construction Allocation -
    28             $400,000)
    29             (Land Allocation - $10,000)
    30             (Design and Contingencies - $150,000)
    19990S0504B1471                 - 392 -

     1         (8)  SR 1002, Lost Creek Bridge over Lost
     2             Creek, Fermanagh Township, Bridge
     3             Replacement                                   920,000
     4             (Base Construction Allocation -
     5             $730,000)
     6             (Land Allocation - $10,000)
     7             (Design and Contingencies - $180,000)
     8         (9)  SR 1004, Little Lost Creek Bridge over
     9             Little Lost Creek, Fayette Township,
    10             Bridge Replacement                            260,000
    11             (Base Construction Allocation -
    12             $150,000)
    13             (Land Allocation - $10,000)
    14             (Design and Contingencies - $100,000)
    15         (10)  SR 2010, Stoney Run Bridge over
    16             Tributary of Stoney Run, Monroe
    17             Township, Bridge Replacement                  290,000
    18             (Base Construction Allocation -
    19             $180,000)
    20             (Land Allocation - $30,000)
    21             (Design and Contingencies - $80,000)
    22         (11)  SR 3025, Tuscarora Creek Bridge over
    23             Tuscarora Creek, Lack Township, Bridge
    24             Replacement                                   560,000
    25             (Base Construction Allocation -
    26             $500,000)
    27             (Land Allocation - $10,000)
    28             (Design and Contingencies - $50,000)
    29  Section 39.  Lackawanna County.
    30     (a)  Local Bridges
    19990S0504B1471                 - 393 -

     1         (1)  Mayfield Borough, Poplar Street Bridge
     2             No.1 at Junction of South Washington
     3             Avenue, Bridge Rehabilitation                 150,000
     4             (Base Construction Allocation -
     5             $130,000)
     6             (Design and Contingencies - $20,000)
     7         (2)  Benton Township, T-474 and T-470,
     8             Seamans Bridge, Bridge Rehabilitation         800,000
     9         (3)  South Abington Township, Leach Street
    10             Bridge, Bridge Replacement                    500,000
    11     (b)  State Bridges
    12         (1)  SR 1016, Hill Street Bridge over
    13             Lackawanna River, Jessup and Blakely
    14             Boroughs, Bridge Deck Rehabilitation          890,000
    15             (Base Construction Allocation -
    16             $800,000)
    17             (Land Allocation - $10,000)
    18             (Design and Contingencies - $80,000)
    19         (2)  SR 3011, Keyser Avenue Bridge over
    20             Lindy Creek, City of Scranton, Bridge
    21             Replacement                                   185,000
    22             (Base Construction Allocation -
    23             $100,000)
    24             (Land Allocation - $10,000)
    25             (Design and Contingencies - $75,000)
    26         (3)  SR 0171, Bridge over Elk Creek at
    27             Junction of SR 1011, Fell Township,
    28             Bridge Replacement                            660,000
    29             (Base Construction Allocation -
    30             $520,000)
    19990S0504B1471                 - 394 -

     1             (Land Allocation - $10,000)
     2             (Design and Contingencies - $130,000)
     3         (4)  SR 0247, Bridge over South Branch of
     4             Tunkhannock Creek, North of TR 438,
     5             Scott Township, Bridge Replacement            426,000
     6             (Base Construction Allocation -
     7             $330,000)
     8             (Land Allocation - $10,000)
     9             (Design and Contingencies - $86,000)
    10         (5)  SR 2003, Bridge over Wallenpaupack
    11             Creek, North of TR 348, Jefferson
    12             Township, Bridge Replacement                  355,000
    13             (Base Construction Allocation -
    14             $275,000)
    15             (Land Allocation - $10,000)
    16             (Design and Contingencies - $70,000)
    17         (6)  SR 3013, Main Street Bridge, Old Forge
    18             Borough, Bridge Painting                      660,000
    19             (Base Construction Allocation -
    20             $600,000)
    21             (Design and Contingencies - $60,000)
    22         (7)  State Bridges, Countywide Bridge Zone
    23             Painting, Bridge Painting                     370,000
    24             (Base Construction Allocation -
    25             $350,000)
    26             (Land Allocation - $10,000)
    27             (Design and Contingencies - $10,000)
    28         (8)  SR 1013, Bridge over Elm Brook, 0.7
    29             Mile North of SR 1006, Scott Township,
    30             Bridge Replacement                            240,000
    19990S0504B1471                 - 395 -

     1             (Base Construction Allocation -
     2             $200,000)
     3             (Land Allocation - $10,000)
     4             (Design and Contingencies - $30,000)
     5         (9)  SR 0524, Kennedy Creek Bridge, 0.5
     6             Mile East of TR 407, North Abington
     7             Township, Bridge Replacement                  330,000
     8             (Base Construction Allocation -
     9             $280,000)
    10             (Land Allocation - $10,000)
    11             (Design and Contingencies - $40,000)
    12         (10)  SR 0011, Roaring Brook Retaining
    13             Wall, Spruce Street Complex, City of
    14             Scranton, Bridge Replacement                1,320,000
    15             (Base Construction Allocation -
    16             $1,160,000)
    17             (Land Allocation - $10,000)
    18             (Design and Contingencies - $150,000)
    19         (11)  SR 3020, Linden Street Bridge over
    20             Lackawanna River, City of Scranton,
    21             Bridge Rehabilitation                         480,000
    22             (Base Construction Allocation -
    23             $380,000)
    24             (Design and Contingencies - $100,000)
    25         (12)  SR 4007, Ackerly Creek Bridge over
    26             Ackerly Creek, Abington Township,
    27             Bridge Replacement                            363,000
    28             (Base Construction Allocation -
    29             $264,000)
    30             (Land Allocation - $11,000)
    19990S0504B1471                 - 396 -

     1             (Design and Contingencies - $88,000)
     2         (13)  SR 0011, Birney Avenue Bridge over SR
     3             8001 Ramp H, Moosic Borough, Bridge
     4             Rehabilitation                                320,000
     5             (Base Construction Allocation -
     6             $300,000)
     7             (Land Allocation - $5,000)
     8             (Design and Contingencies - $15,000)
     9         (14)  SR 2011, Bridge over Lehigh River,
    10             Clifton Township, Bridge
    11             Rehabilitation                                120,000
    12             (Base Construction Allocation -
    13             $100,000)
    14             (Land Allocation - $5,000)
    15             (Design and Contingencies - $15,000)
    16  Section 40.  Lancaster County.
    17     (a)  Local Bridges
    18         (1)  Manor Township, T-599, West Roseville
    19             Road Bridge over Little Conestoga
    20             Creek, Bridge Replacement                     375,000
    21             (Base Construction Allocation -
    22             $286,000)
    23             (Land Allocation - $10,000)
    24             (Design and Contingencies - $150,000)
    25         (2)  Mt. Joy Township, T-350, Risser Mill
    26             Bridge over Tributary of Little
    27             Chickies Creek, Bridge Rehabilitation         550,000
    28             (Base Construction Allocation -
    29             $400,000)
    30             (Design and Contingencies - $150,000)
    19990S0504B1471                 - 397 -

     1         (3)  Pequea Township, Silver Mine Road at
     2             Burnt Mills, Bridge Replacement               100,000
     3             (Base Construction Allocation -
     4             $90,000)
     5             (Design and Contingencies - $10,000)
     6         (4)  East Hempfield and Manheim Townships,
     7             Shreiner Station Road Bridge over
     8             Conestoga Creek, Bridge Replacement           477,000
     9             (Base Construction Allocation -
    10             $377,000)
    11             (Land Allocation - $20,000)
    12             (Design and Contingencies - $80,000)
    13         (5)  City of Lancaster, Liberty Avenue
    14             Bridge over Conrail, New Bridge
    15             Construction                                5,000,000
    16             (Base Construction Allocation -
    17             $4,400,000)
    18             (Land Allocation - $100,000)
    19             (Design and Contingencies - $500,000)
    20         (6)  Manheim Borough, East Stiegel Street
    21             Bridge over Chickies Creek, Bridge
    22             Replacement                                   423,000
    23             (Base Construction Allocation -
    24             $378,000)
    25             (Design and Contingencies - $45,000)
    26         (7)  Penn Township and Manheim Borough,
    27             Power Road and Fuller Drive Bridge over
    28             Chickies Creek, Bridge Rehabilitation          25,000
    29         (8)  RAPHO TOWNSHIP, T-347, EBY CHICQUES                   <--
    30             ROAD BRIDGE OVER CHICQUES CREEK, BRIDGE
    19990S0504B1471                 - 398 -

     1             REPLACEMENT                                   745,000
     2             (BASE CONSTRUCTION ALLOCATION -
     3             $550,000)
     4             (LAND ALLOCATION - $75,000)
     5             (DESIGN AND CONTINGENCIES - $120,000)
     6         (9)  RAPHO TOWNSHIP, T-344, NEWCOMER ROAD
     7             BRIDGE OVER CHICQUES CREEK, BRIDGE
     8             REPLACEMENT                                   670,000
     9             (BASE CONSTRUCTION ALLOCATION -
    10             $450,000)
    11             (LAND ALLOCATION - $100,000)
    12             (DESIGN AND CONTINGENCIES - $120,000)
    13         (10)  RAPHO TOWNSHIP, T-360, GARFIELD ROAD
    14             BRIDGE OVER CHICQUES CREEK, BRIDGE
    15             REPLACEMENT                                   600,000
    16             (BASE CONSTRUCTION ALLOCATION -
    17             $600,000)
    18     (b)  State Bridges
    19         (1)  SR 1024, Bridge over Little Cocalico
    20             Creek, East Cocalico Township, Bridge
    21             Replacement                                   675,000
    22             (Base Construction Allocation -
    23             $550,000)
    24             (Land Allocation - $25,000)
    25             (Design and Contingencies - $100,000)
    26         (2)  PA 372, Bridge over Buck Run, Sadsbury
    27             Township, Bridge Replacement                  172,000
    28             (Base Construction Allocation -
    29             $127,000)
    30             (Land Allocation - $13,000)
    19990S0504B1471                 - 399 -

     1             (Design and Contingencies - $32,000)
     2         (3)  SR 0897, Bridge over Muddy Creek,
     3             Breckrock Township, Bridge Replacement      1,636,000
     4             (Base Construction Allocation -
     5             $1,212,000)
     6             (Land Allocation - $121,000)
     7             (Design and Contingencies - $303,000)
     8         (4)  SR 1011, Bridge over Tributary of
     9             Muddy Creek, Earl Township, Bridge
    10             Replacement                                   522,000
    11             (Base Construction Allocation -
    12             $386,000)
    13             (Land Allocation - $39,000)
    14             (Design and Contingencies - $97,000)
    15         (5)  SR 2019, Bridge over Beaver Creek,
    16             Manor Township, Bridge Replacement            771,000
    17             (Base Construction Allocation -
    18             $571,000)
    19             (Land Allocation - $57,000)
    20             (Design and Contingencies - $143,000)
    21         (6)  SR 1045, Bridge over Cocalico Creek,
    22             Denver Borough, Bridge Replacement          1,317,000
    23             (Base Construction Allocation -
    24             $975,000)
    25             (Land Allocation - $98,000)
    26             (Design and Contingencies - $244,000)
    27         (7)  SR 1053, Bridge over Cocalico Creek,
    28             West Earl Township, Bridge Replacement        629,000
    29             (Base Construction Allocation -
    30             $465,000)
    19990S0504B1471                 - 400 -

     1             (Land Allocation - $47,000)
     2             (Design and Contingencies - $117,000)
     3         (8)  SR 1026, Bridge over Cocalico Creek,
     4             West Cocalico Township, Bridge
     5             Replacement                                 1,173,000
     6             (Base Construction Allocation -
     7             $869,000)
     8             (Land Allocation - $87,000)
     9             (Design and Contingencies - $217,000)
    10         (9)  SR 3032, Bridge over Little Conestoga
    11             Creek, Manor Township, Bridge
    12             Replacement                                 1,050,000
    13             (Base Construction Allocation -
    14             $777,000)
    15             (Land Allocation - $78,000)
    16             (Design and Contingencies - $195,000)
    17         (10)  SR 3017, Bridge over West Branch of
    18             Conestoga Creek, Strasburg Township,
    19             Bridge Replacement                            523,000
    20             (Base Construction Allocation -
    21             $387,000)
    22             (Land Allocation - $39,000)
    23             (Design and Contingencies - $97,000)
    24         (11)  SR 1035, Bridge over Middle Creek,
    25             Clay Township, Bridge Replacement             527,000
    26             (Base Construction Allocation -
    27             $390,000)
    28             (Land Allocation - $39,000)
    29             (Design and Contingencies - $98,000)
    30         (12)  SR 2036, Bridge over Conestoga River,
    19990S0504B1471                 - 401 -

     1             West Lampeter Township, Bridge
     2             Rehabilitation                              1,704,000
     3             (Base Construction Allocation -
     4             $1,263,000)
     5             (Land Allocation - $126,000)
     6             (Design and Contingencies - $315,000)
     7         (13)  PA 222, Bridge over Pequea Creek,
     8             West Lampeter Township, Bridge
     9             Rehabilitation                              1,421,000
    10             (Base Construction Allocation -
    11             $1,053,000)
    12             (Land Allocation - $105,000)
    13             (Design and Contingencies - $263,000)
    14         (14)  SR 0741, Bridge over Conestoga River,
    15             Lancaster Township, Bridge
    16             Rehabilitation                                848,000
    17             (Base Construction Allocation -
    18             $628,000)
    19             (Land Allocation - $63,000)
    20             (Design and Contingencies - $157,000)
    21         (15)  PA 472, Bridge over Octoraro Creek,
    22             Colerain Township, Bridge
    23             Rehabilitation                              1,806,000
    24             (Base Construction Allocation -
    25             $1,337,000)
    26             (Land Allocation - $134,000)
    27             (Design and Contingencies - $335,000)
    28         (16)  Mt. Joy Station Pedestrian Overpass
    29             over Amtrak and Keystone Main Line, Mt.
    30             Joy Borough, New Pedestrian Bridge          2,500,000
    19990S0504B1471                 - 402 -

     1             (Base Construction Allocation -
     2             $2,400,000)
     3             (Land Allocation - $20,000)
     4             (Design and Contingencies - $80,000)
     5  Section 41.  Lawrence County.
     6     (a)  Local Bridges
     7         (1)  City of New Castle, Willard Avenue
     8             Bridge over Tributary of Shenango
     9             River, Bridge Replacement                     210,000
    10             (Base Construction Allocation -
    11             $150,000)
    12             (Land Allocation - $20,000)
    13             (Design and Contingencies - $40,000)
    14         (2)  Wampum Borough, Main Street Bridge
    15             over Eckles Run, Bridge Rehabilitation        190,000
    16             (Base Construction Allocation -
    17             $150,000)
    18             (Design and Contingencies - $40,000)
    19         (3)  Hickory Township, T-478, Bridge over
    20             Hettenbaugh Run, Bridge Replacement           350,000
    21         (4)  Little Beaver Township, T-340, Bridge
    22             over Little Beaver Creek, Bridge
    23             Replacement                                   400,000
    24         (5)  Pulaski Township, T-382, Bridge over
    25             Buchanan Run, Bridge Replacement              400,000
    26         (6)  Scott Township, T-485, Bridge over
    27             Slippery Rock Creek, Bridge
    28             Replacement                                   350,000
    29             (Base Construction Allocation -
    30             $350,000)
    19990S0504B1471                 - 403 -

     1         (7)  Slippery Rock Township, T-395, Bridge
     2             over Hell's Run, Bridge Replacement            16,000
     3             (Base Construction Allocation -
     4             $16,000)
     5         (8)  Union Township, T-420, Bridge over
     6             Tributary of Shenango River, Bridge
     7             Replacement                                   500,000
     8         (9)  Wilmington Township, T-476, Bridge
     9             over Neshannock Creek, Bridge
    10             Replacement                                   500,000
    11         (10)  Wilmington Township, T-464, Bridge
    12             over Neshannock Creek, Bridge
    13             Replacement                                   800,000
    14         (11)  CITY OF NEW CASTLE, GRANT STREET                     <--
    15             BRIDGE OVER SHENANGO RIVER, BRIDGE
    16             REPLACEMENT                                 2,500,000
    17             (BASE CONSTRUCTION ALLOCATION -
    18             $1,800,000)
    19             (LAND ALLOCATION - $200,000)
    20             (DESIGN AND CONTINGENCIES - $500,000)
    21         (12)  NORTH BEAVER TOWNSHIP, T-341, BURKEY
    22             ROAD BRIDGE OVER HONEY CREEK, BRIDGE
    23             REPLACEMENT                                   523,000
    24             (BASE CONSTRUCTION ALLOCATION -
    25             $400,000)
    26             (LAND ALLOCATION - $3,000)
    27             (DESIGN AND CONTINGENCIES - $120,000)
    28         (13)  NORTH BEAVER TOWNSHIP, T-320, MCCLAIN
    29             ROAD BRIDGE OVER TRIBUTARY OF SUGAR
    30             CREEK, BRIDGE REPLACEMENT                     343,000
    19990S0504B1471                 - 404 -

     1             (BASE CONSTRUCTION ALLOCATION -
     2             $250,000)
     3             (LAND ALLOCATION - $3,000)
     4             (DESIGN AND CONTINGENCIES - $90,000)
     5         (14)  NORTH BEAVER TOWNSHIP, T-368, PADEN
     6             ROAD BRIDGE NO.1 OVER TRIBUTARY OF
     7             HICKORY RUN, BRIDGE REPLACEMENT               343,000
     8             (BASE CONSTRUCTION ALLOCATION -
     9             $250,000)
    10             (LAND ALLOCATION - $3,000)
    11             (DESIGN AND CONTINGENCIES - $90,000)
    12         (15)  NORTH BEAVER TOWNSHIP, T-368, PADEN
    13             ROAD BRIDGE NO.2 OVER EDWARDS RUN,
    14             BRIDGE REPLACEMENT                            343,000
    15             (BASE CONSTRUCTION ALLOCATION -
    16             $250,000)
    17             (LAND ALLOCATION - $3,000)
    18             (DESIGN AND CONTINGENCIES - $90,000)
    19         (16)  NORTH BEAVER TOWNSHIP, T-361, MORAVIA
    20             ROAD BRIDGE OVER SUGAR CREEK, BRIDGE
    21             REPLACEMENT                                   343,000
    22             (BASE CONSTRUCTION ALLOCATION -
    23             $250,000)
    24             (LAND ALLOCATION - $3,000)
    25             (DESIGN AND CONTINGENCIES - $90,000)
    26         (17)  NORTH BEAVER TOWNSHIP, T-368, PADEN
    27             ROAD BRIDGE NO.3 OVER JENKINS RUN,
    28             BRIDGE REPLACEMENT                            523,000
    29             (BASE CONSTRUCTION ALLOCATION -
    30             $400,000)
    19990S0504B1471                 - 405 -

     1             (LAND ALLOCATION - $3,000)
     2             (DESIGN AND CONTINGENCIES - $120,000)
     3         (18)  NORTH BEAVER TOWNSHIP, T-700, WAMPUM
     4             ROAD BRIDGE NO.1 OVER JENKINS RUN,
     5             BRIDGE REPLACEMENT                            523,000
     6             (BASE CONSTRUCTION ALLOCATION -
     7             $400,000)
     8             (LAND ALLOCATION - $3,000)
     9             (DESIGN AND CONTINGENCIES - $120,000)
    10         (19)  NORTH BEAVER TOWNSHIP, T-322,
    11             HILLSVILLE ROAD BRIDGE OVER TRIBUTARY
    12             OF HICKORY RUN, BRIDGE REPLACEMENT            343,000
    13             (BASE CONSTRUCTION ALLOCATION -
    14             $250,000)
    15             (LAND ALLOCATION - $3,000)
    16             (DESIGN AND CONTINGENCIES - $90,000)
    17         (20)  NORTH BEAVER TOWNSHIP, T-395, WAMPUM
    18             ROAD BRIDGE NO.2 OVER HICKORY RUN,
    19             BRIDGE REPLACEMENT                            853,000
    20             (BASE CONSTRUCTION ALLOCATION -
    21             $700,000)
    22             (LAND ALLOCATION - $3,000)
    23             (DESIGN AND CONTINGENCIES - $150,000)
    24         (21)  NORTH BEAVER TOWNSHIP, T-395, WAMPUM
    25             ROAD BRIDGE NO.3 OVER MAHONING RIVER,
    26             BRIDGE REPLACEMENT                          2,203,000
    27             (BASE CONSTRUCTION ALLOCATION -
    28             $2,000,000)
    29             (LAND ALLOCATION - $3,000)
    30             (DESIGN AND CONTINGENCIES - $200,000)
    19990S0504B1471                 - 406 -

     1     (b)  State Bridges
     2         (1)  SR 0018, Mahoning Avenue Viaduct over
     3             Shenango River and Railroad, City of
     4             New Castle, Bridge Replacement              9,320,000
     5             (Base Construction Allocation -
     6             $9,000,000)
     7             (Land Allocation - $20,000)
     8             (Design and Contingencies - $300,000)
     9         (2)  SR 0018, Liberty Street Bridge over
    10             Hickory Run, New Castle City, Bridge
    11             Rehabilitation                                450,000
    12             (Base Construction Allocation -
    13             $300,000)
    14             (Land Allocation - $50,000)
    15             (Design and Contingencies - $100,000)
    16         (3)  SR 0060, SR 0060 Southbound over SR
    17             4004, Neshannock Township, Bridge
    18             Replacement                                   350,000
    19             (Base Construction Allocation -
    20             $200,000)
    21             (Land Allocation - $50,000)
    22             (Design and Contingencies - $100,000)
    23         (4)  SR 0065, Ellwood Road Bridge over B &
    24             O Railroad, Shenango Township, Bridge
    25             Replacement                                   400,000
    26             (Base Construction Allocation -
    27             $250,000)
    28             (Land Allocation - $50,000)
    29             (Design and Contingencies - $100,000)
    30         (5)  SR 0488, Portersville Road Bridge over
    19990S0504B1471                 - 407 -

     1             Morrison Run, Perry Township, Bridge
     2             Replacement                                   250,000
     3             (Base Construction Allocation -
     4             $100,000)
     5             (Land Allocation - $50,000)
     6             (Design and Contingencies - $100,000)
     7         (6)  SR 0488, Portersville Road Bridge over
     8             Morrison Run, Perry Township, Bridge
     9             Replacement                                   250,000
    10             (Base Construction Allocation -
    11             $100,000)
    12             (Land Allocation - $50,000)
    13             (Design and Contingencies - $100,000)
    14         (7)  SR 3001, South Main Street Bridge over
    15             Bessemer Haul Road, Bessemer Borough,
    16             Bridge Rehabilitation                         950,000
    17             (Base Construction Allocation -
    18             $800,000)
    19             (Design and Contingencies - $150,000)
    20         (8)  SR 4004, Union and Neshannock
    21             Townships, Bridge Rehabilitation              800,000
    22             (Base Construction Allocation -
    23             $700,000)
    24             (Design and Contingencies - $100,000)
    25         (9)  SR 0060, Beaver Valley Expansion
    26             Bridge over SR 4005, Neshannock
    27             Township, Bridge Rehabilitation               650,000
    28             (Base Construction Allocation -
    29             $500,000)
    30             (Design and Contingencies - $150,000)
    19990S0504B1471                 - 408 -

     1         (10)  SR 0060, Beaver Valley Extension
     2             Bridge over SR 4005, Neshannock
     3             Township, Bridge Rehabilitation               127,000
     4             (Base Construction Allocation -
     5             $116,000)
     6             (Design and Contingencies - $11,000)
     7         (11)  SR 0081, US 224 State Street Bridge
     8             over SR 0422 and Ramp K, Union
     9             Township, Bridge Rehabilitation               706,000
    10             (Base Construction Allocation -
    11             $644,000)
    12             (Design and Contingencies - $62,000)
    13         (12)  SR 0422, Westbound Bridge over Beaver
    14             River, Railroad and Local Street,
    15             Taylor Township, Bridge Rehabilitation      6,841,000
    16             (Base Construction Allocation -
    17             $6,741,000)
    18             (Design and Contingencies - $100,000)
    19         (13)  SR 0422, Eastbound Bridge over Beaver
    20             River, Railroad and Local Street,
    21             Taylor Township, Bridge Replacement         6,963,000
    22             (Base Construction Allocation -
    23             $6,863,000)
    24             (Design and Contingencies - $100,000)
    25         (14)  SR 0422, Bridge over Business US 422,
    26             Union Township, Bridge Rehabilitation       1,379,000
    27             (Base Construction Allocation -
    28             $1,254,000)
    29             (Design and Contingencies - $125,000)
    30         (15)  SR 0422, Ben Franklin Highway Bridge
    19990S0504B1471                 - 409 -

     1             over Business US 422, Union Township,
     2             Bridge Rehabilitation                         436,000
     3             (Base Construction Allocation -
     4             $398,000)
     5             (Design and Contingencies - $38,000)
     6         (16)  SR 0551, Main Street Bridge over
     7             Beaver Creek, Little Beaver Township,
     8             Bridge Replacement                            624,000
     9             (Base Construction Allocation -
    10             $524,000)
    11             (Design and Contingencies - $100,000)
    12         (17)  SR 2020, Pleasant Road Bridge over
    13             Camp Run, Perry Township, Bridge
    14             Replacement                                   400,000
    15             (Base Construction Allocation -
    16             $300,000)
    17             (Design and Contingencies - $100,000)
    18         (18)  SR 3002, Beaver Dam Road Bridge over
    19             Honey Creek, Little Beaver Township,
    20             Bridge Painting                                30,000
    21             (Base Construction Allocation -
    22             $25,000)
    23             (Design and Contingencies - $5,000)
    24         (19)  SR 3004, Wallace Road Bridge over
    25             Sugar Creek, North Beaver Township,
    26             Bridge Replacement                            130,000
    27             (Base Construction Allocation -
    28             $120,000)
    29             (Design and Contingencies - $10,000)
    30         (20)  SR 3004, Wallace Road Bridge over
    19990S0504B1471                 - 410 -

     1             Branch of Honey Creek, North Beaver
     2             Township, Bridge Painting                      30,000
     3             (Base Construction Allocation -
     4             $25,000)
     5             (Design and Contingencies - $5,000)
     6         (21)  SR 3004, Wallace Road Bridge over
     7             Branch of Honey Creek, North Beaver
     8             Township, Bridge Painting                     325,000
     9             (Base Construction Allocation -
    10             $300,000)
    11             (Design and Contingencies - $25,000)
    12         (22)  SR 4006, Coffee Run Bridge over
    13             Coffee Run, Mahoning Township, Bridge
    14             Replacement                                   335,000
    15             (Base Construction Allocation -
    16             $270,000)
    17             (Land Allocation - $15,000)
    18             (Design and Contingencies - $50,000)
    19         (23)  SR 0224, Bridge over Conrail,
    20             Mahoning Township, Bridge Replacement       2,000,000
    21             (Base Construction Allocation -
    22             $1,700,000)
    23             (Land Allocation - $100,000)
    24             (Design and Contingencies - $200,000)
    25         (24)  SR 2003, Wurtemburg Road Bridge over
    26             Branch of Duck Run, Mahoning Township,
    27             Bridge Replacement                            135,000
    28             (Base Construction Allocation -
    29             $100,000)
    30             (Land Allocation - $20,000)
    19990S0504B1471                 - 411 -

     1             (Design and Contingencies - $15,000)
     2         (25)  SR 0168, Moravia Street Bridge over
     3             US 422, Taylor Township, Bridge
     4             Rehabilitation                                761,000
     5             (Base Construction Allocation -
     6             $662,000)
     7             (Design and Contingencies - $99,000)
     8         (26)  SR 0288, Main Street Bridge over
     9             Tributary of Beaver River, Wayne
    10             Township, Bridge Replacement                  296,000
    11             (Base Construction Allocation -
    12             $240,000)
    13             (Land Allocation - $20,000)
    14             (Design and Contingencies - $36,000)
    15         (27)  SR 1001, High Street Bridge over
    16             Little Neshannock Creek, New Wilmington
    17             Borough, Bridge Replacement                    89,000
    18             (Base Construction Allocation -
    19             $60,000)
    20             (Land Allocation - $20,000)
    21             (Design and Contingencies - $9,000)
    22         (28)  SR 2007, Armstrong Road Bridge over
    23             Branch of Slippery Rock Creek, Perry
    24             Township, Bridge Replacement                  420,000
    25             (Base Construction Allocation -
    26             $300,000)
    27             (Land Allocation - $20,000)
    28             (Design and Contingencies - $100,000)
    29         (29)  SR 3004, Honey Creek Bridge No.1 over
    30             Branch of Honey Creek, North Beaver
    19990S0504B1471                 - 412 -

     1             Township, Bridge Rehabilitation                25,000
     2             (Base Construction Allocation -
     3             $20,000)
     4             (Design and Contingencies - $5,000)
     5         (30)  SR 3004, Honey Creek Bridge No.2 over
     6             Branch of Honey Creek, North Beaver
     7             Township, Bridge Painting                      25,000
     8             (Base Construction Allocation -
     9             $20,000)
    10             (Design and Contingencies - $5,000)
    11         (31)  SR 3004, Honey Creek Bridge No.3 over
    12             Branch of Honey Creek, North Beaver
    13             Township, Bridge Painting                      25,000
    14             (Base Construction Allocation -
    15             $20,000)
    16             (Design and Contingencies - $5,000)
    17         (32)  SR 4001, Villa Maria Road Bridge over
    18             Tributary of Coffee Run, Mahoning
    19             Township, Bridge Replacement                  234,000
    20             (Base Construction Allocation -
    21             $186,000)
    22             (Land Allocation - $20,000)
    23             (Design and Contingencies - $28,000)
    24         (33)  SR 0488, Bridge over Connequessing
    25             Creek, Ellport Borough, Bridge
    26             Rehabilitation                              3,010,000
    27         (34)  SR 4007, Bridge over Sankey Run,
    28             Union Township, Bridge Replacement            400,000
    29             (Land Allocation - $50,000)
    30             (Design and Contingencies - $350,000)
    19990S0504B1471                 - 413 -

     1         (35)  SR 2005, Bridge over Slippery Rock
     2             Creek, Wayne and Perry Townships,
     3             Bridge Replacement                            793,000
     4             (Land Allocation - $150,000)
     5             (Design and Contingencies - $643,000)
     6  Section 42.  Lebanon County.
     7     (a)  Local Bridges
     8         (1)  Union Township, T-617, Green Point
     9             School House Bridge over Trout Run,
    10             Bridge Replacement                            255,000
    11             (Base Construction Allocation -
    12             $170,000)
    13             (Land Allocation - $10,000)
    14             (Design and Contingencies - $75,000)
    15         (2)  Bethel Township, Market Drive, T-545
    16             over Beach Run, Bridge Replacement             30,000
    17             (Base Construction Allocation -
    18             $20,000)
    19             (Design and Contingencies - $10,000)
    20         (3)  South Londonderry Township, Patrick
    21             Road, T-331 over Tributary of Little
    22             Conewago Creek, Bridge Rehabilitation           5,000
    23             (Base Construction Allocation - $4,000)
    24             (Design and Contingencies - $1,000)
    25         (4)  South Londonderry Township, Eckert
    26             Road, T-304 over Little Conewago Creek,
    27             Bridge Rehabilitation                           5,000
    28             (Base Construction Allocation - $4,000)
    29             (Design and Contingencies - $1,000)
    30         (5)  South Londonderry Township, Risser
    19990S0504B1471                 - 414 -

     1             Road, T-300 over Conewago Creek, Bridge
     2             Rehabilitation                                  4,000
     3             (Base Construction Allocation - $3,000)
     4             (Design and Contingencies - $1,000)
     5         (6)  South Londonderry Township, Long Road,
     6             T-304 over Tributary of Conewago Creek,
     7             Bridge Rehabilitation                           4,000
     8             (Base Construction Allocation - $3,000)
     9             (Design and Contingencies - $1,000)
    10         (7)  South Londonderry Township, Eckert
    11             Road, T-304 over Tributary of Little
    12             Conewago Creek, Bridge Rehabilitation           5,000
    13             (Base Construction Allocation - $4,000)
    14             (Design and Contingencies - $1,000)
    15         (8)  South Londonderry Township, Church
    16             Road, T-303 over Unnamed Creek, Bridge
    17             Rehabilitation                                  3,000
    18             (Base Construction Allocation - $2,000)
    19             (Design and Contingencies - $1,000)
    20         (9)  South Londonderry Township, Patrick
    21             Road, T-331 over Tributary of Little
    22             Conewago Creek, Bridge Rehabilitation           4,000
    23             (Base Construction Allocation - $3,000)
    24             (Design and Contingencies - $1,000)
    25         (10)  South Londonderry Township, Hinkle
    26             Road, T-433 over Killinger Creek,
    27             Bridge Rehabilitation                           4,000
    28             (Base Construction Allocation - $3,000)
    29             (Design and Contingencies - $1,000)
    30         (11)  South Londonderry Township, Brandt
    19990S0504B1471                 - 415 -

     1             Road, T-346 over Killinger Creek,
     2             Bridge Rehabilitation                           3,000
     3             (Base Construction Allocation - $2,000)
     4             (Design and Contingencies - $1,000)
     5         (12)  Union Township, Green Point School
     6             House Road, T-617 over Trout Run,
     7             Bridge Replacement                             90,000
     8             (Base Construction Allocation -
     9             $70,000)
    10             (Design and Contingencies - $20,000)
    11         (13)  South Lebanon Township, Wilhelm
    12             Overpass, Reconstruct as Pedestrian
    13             Bridge                                        150,000
    14             (Base Construction Allocation -
    15             $125,000)
    16             (Design and Contingencies - $25,000)
    17     (b)  State Bridges
    18         (1)  PA 934, Bridge over Conrail, Annville
    19             Township, Bridge Replacement                  981,000
    20             (Base Construction Allocation -
    21             $726,000)
    22             (Land Allocation - $73,000)
    23             (Design and Contingencies - $182,000)
    24         (2)  SR 2014, Bridge over Mill Creek,
    25             Millcreek Township, Bridge Replacement        691,000
    26             (Base Construction Allocation -
    27             $512,000)
    28             (Land Allocation - $51,000)
    29             (Design and Contingencies - $128,000)
    30  Section 43.  Lehigh County.
    19990S0504B1471                 - 416 -

     1     (a)  Local Bridges
     2         (1)  Coplay and Northampton Boroughs,
     3             Chestnut Street Bridge over Lehigh
     4             River, Bridge Rehabilitation                2,000,000
     5             (Base Construction Allocation -
     6             $1,900,000)
     7             (Design and Contingencies - $100,000)
     8         (2)  Hokendauqua and North Catasauqua
     9             Boroughs, Lehigh Street Bridge over
    10             Lehigh River, Bridge Replacement            8,750,000
    11             (Base Construction Allocation -
    12             $8,500,000)
    13             (Design and Contingencies - $250,000)
    14         (3)  Allentown City, Linden Street Bridge
    15             over Jordan Creek, Bridge
    16             Rehabilitation                              1,680,000
    17             (Base Construction Allocation -
    18             $1,600,000)
    19             (Design and Contingencies - $80,000)
    20     (b)  State Bridges
    21         (1)  SR 4007, Schlicher's Bridge over
    22             Jordan Creek, North Whitehall Township,
    23             Bridge Replacement                            875,000
    24             (Base Construction Allocation -
    25             $560,000)
    26             (Land Allocation - $145,000)
    27             (Design and Contingencies - $170,000)
    28         (2)  SR 3011, Farmington Road over
    29             Tributary of Schaffer Run, Upper
    30             Macungie Township, Bridge
    19990S0504B1471                 - 417 -

     1             Rehabilitation                                330,000
     2             (Base Construction Allocation -
     3             $175,000)
     4             (Land Allocation - $55,000)
     5             (Design and Contingencies - $100,000)
     6         (3)  SR 1027, Cold Springs Road over Spring
     7             Creek, Whitehall Township, Bridge
     8             Replacement                                 2,550,000
     9             (Base Construction Allocation -
    10             $1,640,000)
    11             (Land Allocation - $420,000)
    12             (Design and Contingencies - $490,000)
    13         (4)  SR 0378, Bridges over 14th, 8th and
    14             Eaton Avenue, Catasaqua and Broad
    15             Streets, Bridge Replacement                   457,000
    16             (Base Construction Allocation -
    17             $400,000)
    18             (Land Allocation - $12,000)
    19             (Design and Contingencies - $45,000)
    20         (5)  American Parkway Bridge over Lehigh
    21             River, Allentown City, Bridge
    22             Replacement                                17,000,000
    23             (Base Construction Allocation -
    24             $15,000,000)
    25             (Land Allocation - $1,000,000)
    26             (Design and Contingencies - $1,000,000)
    27  Section 44.  Luzerne County.
    28     (a)  Local Bridges
    29         (1)  Ashley Borough, Ashley Street Bridge,
    30             Bridge Removal                                260,000
    19990S0504B1471                 - 418 -

     1             (Base Construction Allocation -
     2             $200,000)
     3             (Land Allocation - $5,000)
     4             (Design and Contingencies - $55,000)
     5         (2)  Franklin Township, T-784, Bridge over
     6             Sutton Creek, Bridge Replacement              320,000
     7             (Base Construction Allocation -
     8             $250,000)
     9             (Land Allocation - $15,000)
    10             (Design and Contingencies - $55,000)
    11         (3)  Black Creek Township, T-309 over Falls
    12             Run Creek, Bridge Replacement                 395,000
    13             (Base Construction Allocation -
    14             $265,000)
    15             (Land Allocation - $5,000)
    16             (Design and Contingencies - $125,000)
    17         (4)  Black Creek Township, T-314 over
    18             Branch of Black Creek, Bridge
    19             Replacement                                   440,000
    20             (Base Construction Allocation -
    21             $310,000)
    22             (Land Allocation - $5,000)
    23             (Design and Contingencies - $125,000)
    24         (5)  Butler Township, T-356 over Nescopeck
    25             Creek, Bridge Replacement                     405,000
    26             (Base Construction Allocation -
    27             $275,000)
    28             (Land Allocation - $5,000)
    29             (Design and Contingencies - $125,000)
    30         (6)  City of Wilkes-Barre, Division Street
    19990S0504B1471                 - 419 -

     1             over Solomon's Creek, Bridge
     2             Replacement                                   955,000
     3             (Base Construction Allocation -
     4             $800,000)
     5             (Land Allocation - $5,000)
     6             (Design and Contingencies - $150,000)
     7         (7)  Dallas Township, County Road No.12
     8             over Toby's Creek, Bridge Replacement         405,000
     9             (Base Construction Allocation -
    10             $275,000)
    11             (Land Allocation - $5,000)
    12             (Design and Contingencies - $125,000)
    13         (8)  Dennison Township, County Road No.41
    14             over Nescopeck Creek, Bridge
    15             Replacement                                   405,000
    16             (Base Construction Allocation -
    17             $275,000)
    18             (Land Allocation - $5,000)
    19             (Design and Contingencies - $125,000)
    20         (9)  Dorrance Township, County Road No.30
    21             over Wapwallopen Creek, Bridge
    22             Replacement                                   405,000
    23             (Base Construction Allocation -
    24             $275,000)
    25             (Land Allocation - $5,000)
    26             (Design and Contingencies - $125,000)
    27         (10)  Fairmount Township, T-563 over Maple
    28             Run Creek, Bridge Replacement                 395,000
    29             (Base Construction Allocation -
    30             $265,000)
    19990S0504B1471                 - 420 -

     1             (Land Allocation - $5,000)
     2             (Design and Contingencies - $125,000)
     3         (11)  Franklin Township, T-782 over Sutton
     4             Creek, Bridge Replacement                     405,000
     5             (Base Construction Allocation -
     6             $275,000)
     7             (Land Allocation - $5,000)
     8             (Design and Contingencies - $125,000)
     9         (12)  Hunlock Township, T-534 over Hunlock
    10             Creek, Bridge Replacement                     405,000
    11             (Base Construction Allocation -
    12             $275,000)
    13             (Land Allocation - $5,000)
    14             (Design and Contingencies - $125,000)
    15         (13)  Jackson Township, County Road No.16
    16             over Toby's Creek, Bridge Replacement         350,000
    17             (Base Construction Allocation -
    18             $225,000)
    19             (Land Allocation - $5,000)
    20             (Design and Contingencies - $120,000)
    21         (14)  Jackson Township, County Road No.16
    22             over Toby's Creek, Bridge Replacement         370,000
    23             (Base Construction Allocation -
    24             $240,000)
    25             (Land Allocation - $5,000)
    26             (Design and Contingencies - $125,000)
    27         (15)  Jackson Township, T-605 over Branch
    28             of Harvey's Creek, Bridge Replacement         395,000
    29             (Base Construction Allocation -
    30             $265,000)
    19990S0504B1471                 - 421 -

     1             (Land Allocation - $5,000)
     2             (Design and Contingencies - $125,000)
     3         (16)  Jackson Township, County Road No.13
     4             over Toby's Creek, Bridge Replacement         395,000
     5             (Base Construction Allocation -
     6             $265,000)
     7             (Land Allocation - $5,000)
     8             (Design and Contingencies - $125,000)
     9         (17)  Lake Township, T-796 over Beaver Run
    10             Creek, Bridge Replacement                     410,000
    11             (Base Construction Allocation -
    12             $280,000)
    13             (Land Allocation - $5,000)
    14             (Design and Contingencies - $125,000)
    15         (18)  Lake Township, T-779 over Bryant Pond
    16             Outlet, Bridge Replacement                    430,000
    17             (Base Construction Allocation -
    18             $300,000)
    19             (Land Allocation - $5,000)
    20             (Design and Contingencies - $125,000)
    21         (19)  Nescopeck Township, T-381 over Branch
    22             of Nescopeck Creek, Bridge Replacement        410,000
    23             (Base Construction Allocation -
    24             $280,000)
    25             (Land Allocation - $5,000)
    26             (Design and Contingencies - $125,000)
    27         (20)  Ross Township, T-680 over Huntingdon
    28             Creek, Bridge Replacement                     410,000
    29             (Base Construction Allocation -
    30             $280,000)
    19990S0504B1471                 - 422 -

     1             (Land Allocation - $5,000)
     2             (Design and Contingencies - $125,000)
     3         (21)  Ross Township, T-571 over Outlet
     4             North Pond, Bridge Replacement                420,000
     5             (Base Construction Allocation -
     6             $290,000)
     7             (Land Allocation - $5,000)
     8             (Design and Contingencies - $125,000)
     9         (22)  Ross Township, T-575 over Huntingdon
    10             Creek, Bridge Replacement                     455,000
    11             (Base Construction Allocation -
    12             $325,000)
    13             (Land Allocation - $5,000)
    14             (Design and Contingencies - $125,000)
    15         (23)  Ross Township, County Road No.2 over
    16             Marsh Creek, Bridge Replacement               440,000
    17             (Base Construction Allocation -
    18             $310,000)
    19             (Land Allocation - $5,000)
    20             (Design and Contingencies - $125,000)
    21         (24)  Sugarloaf Township, T-332 over Branch
    22             of Nescopeck Creek, Bridge Replacement        430,000
    23             (Base Construction Allocation -
    24             $300,000)
    25             (Land Allocation - $5,000)
    26             (Design and Contingencies - $125,000)
    27         (25)  Plymouth Township, T-497 over Mud
    28             Pond Inlet, Bridge Replacement                405,000
    29             (Base Construction Allocation -
    30             $275,000)
    19990S0504B1471                 - 423 -

     1         (26)  Slocum Township, T-454 over Black
     2             Creek, Bridge Replacement                     395,000
     3             (Base Construction Allocation -
     4             $265,000)
     5             (Land Allocation - $5,000)
     6             (Design and Contingencies - $125,000)
     7         (27)  Wright Township, County Road No.21
     8             over Wapwallopen Creek, Bridge
     9             Replacement                                   395,000
    10             (Base Construction Allocation -
    11             $265,000)
    12             (Land Allocation - $5,000)
    13             (Design and Contingencies - $125,000)
    14         (28)  City of Wilkes-Barre, Stanton Street,
    15             Bowman Spring Run Bridge, Intersection
    16             of Empire Street, Bridge Replacement          170,000
    17             (Base Construction Allocation -
    18             $140,000)
    19             (Land Allocation - $10,000)
    20             (Design and Contingencies - $20,000)
    21         (29)  Borough of Larksville, Nesbitt Street
    22             Bridge, Bridge Replacement                    150,000
    23             (Base Construction Allocation -
    24             $95,000)
    25             (Design and Contingencies - $14,000)
    26         (30)  CITY OF WILKES-BARRE, STANTON STREET                 <--
    27             BRIDGE OVER BOWMAN SPRING RUN, BRIDGE
    28             REPLACEMENT                                   500,000
    29         (31)  KINGSTON TOWNSHIP, SR 0309, ONE-TENTH
    30             OF A MILE SOUTH OF SR 1036, BRIDGE OVER
    19990S0504B1471                 - 424 -

     1             TOBY CREEK, BRIDGE REPLACEMENT              1,085,000
     2             (BASE CONSTRUCTION ALLOCATION -
     3             $896,000)
     4             (LAND ALLOCATION - $10,000)
     5             (DESIGN AND CONTINGENCIES - $179,000)
     6         (32)  KINGSTON TOWNSHIP, SR 0309, ONE MILE
     7             SOUTH OF SR 1014, BRIDGE OVER TOBY
     8             CREEK, BRIDGE REPLACEMENT                   1,868,000
     9             (BASE CONSTRUCTION ALLOCATION -
    10             $1,548,000)
    11             (LAND ALLOCATION - $10,000)
    12             (DESIGN AND CONTINGENCIES - $310,000)
    13         (33)  KINGSTON TOWNSHIP, SR 0309, SEVEN-
    14             TENTHS OF A MILE SOUTH OF SR 1014,
    15             BRIDGE OVER TOBY CREEK, BRIDGE
    16             REPLACEMENT                                 1,392,000
    17             (BASE CONSTRUCTION ALLOCATION -
    18             $1,152,000)
    19             (LAND ALLOCATION - $10,000)
    20             (DESIGN AND CONTINGENCIES - $230,000)
    21         (34)  KINGSTON TOWNSHIP, SR 0309, SIX-
    22             TENTHS OF A MILE SOUTH OF SR 1014,
    23             BRIDGE OVER TOBY CREEK, BRIDGE
    24             REPLACEMENT                                 1,138,000
    25             (BASE CONSTRUCTION ALLOCATION -
    26             $940,000)
    27             (LAND ALLOCATION - $10,000)
    28             (DESIGN AND CONTINGENCIES - $188,000)
    29         (35)  DALLAS TOWNSHIP, SR 0415, THREE-
    30             TENTHS OF A MILE FROM SR 1018, BRIDGE
    19990S0504B1471                 - 425 -

     1             OVER HUNTSVILLE CREEK, BRIDGE
     2             REPLACEMENT                                   711,000
     3             (BASE CONSTRUCTION ALLOCATION -
     4             $584,000)
     5             (LAND ALLOCATION - $10,000)
     6             (DESIGN AND CONTINGENCIES - $117,000)
     7         (36)  EXETER BOROUGH, SR 1010, TWO-TENTHS
     8             OF A MILE WEST OF SR 1025, BRIDGE OVER
     9             HICKS CREEK, BRIDGE REPLACEMENT               426,000
    10             (BASE CONSTRUCTION ALLOCATION -
    11             $347,000)
    12             (LAND ALLOCATION - $10,000)
    13             (DESIGN AND CONTINGENCIES - $69,000)
    14         (37)  DALLAS TOWNSHIP, SR 1014, BRIDGE OVER
    15             SR 0309, BRIDGE REPLACEMENT                   882,000
    16             (BASE CONSTRUCTION ALLOCATION -
    17             $727,000)
    18             (LAND ALLOCATION - $10,000)
    19             (DESIGN AND CONTINGENCIES - $145,000)
    20         (38)  WEST WYOMING BOROUGH, SR 1021, FIVE-
    21             TENTHS OF A MILE NORTH OF SR 1010,
    22             BRIDGE OVER ABRAHAMS CREEK, BRIDGE
    23             REPLACEMENT                                   651,000
    24             (BASE CONSTRUCTION ALLOCATION -
    25             $534,000)
    26             (LAND ALLOCATION - $10,000)
    27             (DESIGN AND CONTINGENCIES - $107,000)
    28         (39)  DALLAS TOWNSHIP, SR 1044, ONE AND
    29             EIGHT-TENTHS OF A MILE EAST OF SR 1041,
    30             BRIDGE OVER BRANCH OF TOBY CREEK,
    19990S0504B1471                 - 426 -

     1             BRIDGE REPLACEMENT                            398,000
     2             (BASE CONSTRUCTION ALLOCATION -
     3             $323,000)
     4             (LAND ALLOCATION - $10,000)
     5             (DESIGN AND CONTINGENCIES - $65,000)
     6         (40)  KINGSTON TOWNSHIP, T-846, CENTER
     7             STREET, ONE-TENTH OF A MILE EAST OF TR
     8             309, BRIDGE OVER TOBY CREEK, BRIDGE
     9             REPLACEMENT                                   490,000
    10             (BASE CONSTRUCTION ALLOCATION -
    11             $400,000)
    12             (LAND ALLOCATION - $10,000)
    13             (DESIGN AND CONTINGENCIES - $80,000)
    14         (41)  EXETER TOWNSHIP, SR 0092, 153 FEET
    15             NORTH OF SR 1040, BRIDGE OVER LEWIS
    16             CREEK, BRIDGE REPLACEMENT                     471,000
    17             (BASE CONSTRUCTION ALLOCATION -
    18             $384,000)
    19             (LAND ALLOCATION - $10,000)
    20             (DESIGN AND CONTINGENCIES - $77,000)
    21         (42)  PRINGLE BOROUGH, SR 0309, 500 FEET
    22             NORTH OF SR 1013, BRIDGE OVER TOBY
    23             CREEK, BRIDGE REPLACEMENT                     860,000
    24             (BASE CONSTRUCTION ALLOCATION -
    25             $708,000)
    26             (LAND ALLOCATION - $10,000)
    27             (DESIGN AND CONTINGENCIES - $142,000)
    28         (43)  KINGSTON TOWNSHIP, SR 0309, 399 FEET
    29             NORTH OF CENTER STREET, BRIDGE OVER
    30             TRIBUTARY OF TOBY CREEK, BRIDGE
    19990S0504B1471                 - 427 -

     1             REPLACEMENT                                   590,000
     2             (BASE CONSTRUCTION ALLOCATION -
     3             $483,000)
     4             (LAND ALLOCATION - $10,000)
     5             (DESIGN AND CONTINGENCIES - $97,000)
     6         (44)  LUZERNE BOROUGH, SR 1054,
     7             INTERSECTION OF SR 1013, BRIDGE OVER
     8             TOBY CREEK, BRIDGE REPLACEMENT                750,000
     9             (BASE CONSTRUCTION ALLOCATION -
    10             $600,000)
    11             (LAND ALLOCATION - $30,000)
    12             (DESIGN AND CONTINGENCIES - $120,000)
    13     (b)  State Bridges
    14         (1)  SR 0011, Erie-Lackawanna Railroad
    15             Bridge over Erie-Lackawanna Railroad,
    16             Plymouth Township, Bridge Removal             185,000
    17             (Base Construction Allocation -
    18             $150,000)
    19             (Land Allocation - $10,000)
    20             (Design and Contingencies - $25,000)
    21         (2)  SR 1030, Harvey's Lake Bridge at
    22             Junction of SR 1053, Lake Township,
    23             Bridge Replacement                            460,000
    24             (Base Construction Allocation -
    25             $350,000)
    26             (Land Allocation - $20,000)
    27             (Design and Contingencies - $90,000)
    28         (3)  SR 3007, Bridge over Wapwallopen
    29             Creek, South of SR 3010, Dorrance
    30             Township, Bridge Replacement                  530,000
    19990S0504B1471                 - 428 -

     1             (Base Construction Allocation -
     2             $420,000)
     3             (Land Allocation - $10,000)
     4             (Design and Contingencies - $100,000)
     5         (4)  State Bridges, Countywide Bridge Zone
     6             Painting, Bridge Painting                     500,000
     7             (Base Construction Allocation -
     8             $350,000)
     9             (Land Allocation - $10,000)
    10             (Design and Contingencies - $10,000)
    11         (5)  SR 3038, Black Creek Stone Arch
    12             Bridge, 0.1 Mile North of SR 3018,
    13             Black Creek Township, Bridge
    14             Replacement                                   240,000
    15             (Base Construction Allocation -
    16             $200,000)
    17             (Land Allocation - $10,000)
    18             (Design and Contingencies - $30,000)
    19         (6)  SR 1034, Pikes Creek Bridge, 132 Feet
    20             East of TR 11, Lake Township, Bridge
    21             Replacement                                   180,000
    22             (Base Construction Allocation -
    23             $150,000)
    24             (Land Allocation - $10,000)
    25             (Design and Contingencies - $20,000)
    26         (7)  SR 2041, Wright Creek Bridge, 2 Miles
    27             North of TR 940, Dennison Township,
    28             Bridge Replacement                            400,000
    29             (Base Construction Allocation -
    30             $340,000)
    19990S0504B1471                 - 429 -

     1             (Land Allocation - $10,000)
     2             (Design and Contingencies - $50,000)
     3         (8)  SR 0309, Toby's Creek Bridge over
     4             Toby's Creek, Kingston Township, Bridge
     5             Replacement                                 1,276,000
     6             (Base Construction Allocation -
     7             $1,100,000)
     8             (Land Allocation - $11,000)
     9             (Design and Contingencies - $165,000)
    10         (9)  SR 0309, North Cross Valley Dams over
    11             Susquehanna River, Plains Township,
    12             Bridge Rehabilitation                       1,517,000
    13             (Base Construction Allocation -
    14             $1,377,000)
    15             (Design and Contingencies - $140,000)
    16         (10)  SR 0415, Harveys Lake Inlet Bridge
    17             No.2 over Harveys Lake Inlet, Harveys
    18             Lake Borough, Bridge Replacement              345,000
    19             (Base Construction Allocation -
    20             $260,000)
    21             (Land Allocation - $10,000)
    22             (Design and Contingencies - $75,000)
    23         (11)  SR 2036, Bald Mountain Road Bridge
    24             over Bear Creek, Bear Creek Township,
    25             Bridge Rehabilitation                         220,000
    26             (Base Construction Allocation -
    27             $200,000)
    28             (Land Allocation - $5,000)
    29             (Design and Contingencies - $15,000)
    30         (12)  SR 1054, TOBY CREEK, INTERSECTION OF                 <--
    19990S0504B1471                 - 430 -

     1             SR 1013, LUZERNE BOROUGH, BRIDGE
     2             REPLACEMENT                                   750,000
     3             (BASE CONSTRUCTION ALLOCATION -
     4             $600,000)
     5             (LAND ALLOCATION - $30,000)
     6             (DESIGN AND CONTINGENCIES - $120,000)
     7         (13)  SR 6309, COAL BROOK BRIDGE, 0.2 MILES
     8             SOUTH OF SR 2020, CITY OF WILKES-BARRE,
     9             BRIDGE REPLACEMENT                            900,000
    10             (BASE CONSTRUCTION ALLOCATION -
    11             $720,000)
    12             (LAND ALLOCATION - $30,000)
    13             (DESIGN AND CONTINGENCIES - $150,000)
    14         (14)  SR 0080, BLACK CREEK BRIDGE, 4.0
    15             MILES WEST OF TR 93, BLACK CREEK
    16             TOWNSHIP, BRIDGE DECK REPLACEMENT           2,000,000
    17             (BASE CONSTRUCTION ALLOCATION -
    18             $1,800,000)
    19             (DESIGN AND CONTINGENCIES - $200,000)
    20  Section 45.  Lycoming County.
    21     (a)  Local Bridges
    22         (1)  Mifflin Township, T-651 over Larry's
    23             Creek, Bridge Replacement                     528,000
    24             (Base Construction Allocation -
    25             $438,000)
    26             (Land Allocation - $20,000)
    27             (Design and Contingencies - $70,000)
    28         (2)  McIntyre Township, T-667, Rolston
    29             Bridge over Lycoming Creek, Bridge
    30             Replacement                                 1,620,000
    19990S0504B1471                 - 431 -

     1             (Base Construction Allocation -
     2             $1,400,000)
     3             (Land Allocation - $20,000)
     4             (Design and Contingencies - $200,000)
     5         (3)  Franklin Township, T-710, Bridge over
     6             Beaver Run, Bridge Replacement                265,000
     7             (Base Construction Allocation -
     8             $212,000)
     9             (Land Allocation - $40,000)
    10             (Design and Contingencies - $13,000)
    11         (4)  Piatt Township, T-365, Bridge over
    12             Larry's Creek, Bridge Replacement           1,251,000
    13             (Base Construction Allocation -
    14             $1,039,000)
    15             (Land Allocation - $30,000)
    16             (Design and Contingencies - $182,000)
    17         (5)  McIntyre Township, T-673, Bridge over
    18             Lycoming Creek, Bridge Replacement            902,000
    19             (Base Construction Allocation -
    20             $744,000)
    21             (Land Allocation - $23,000)
    22             (Design and Contingencies - $135,000)
    23         (6)  Shrewsbury Township, T-686, Bridge
    24             over Rock Run, Bridge Replacement             288,000
    25             (Base Construction Allocation -
    26             $238,000)
    27             (Land Allocation - $7,000)
    28             (Design and Contingencies - $43,000)
    29         (7)  Piatt Township, T-343, Bridge over
    30             Pine Run, Bridge Replacement                  353,000
    19990S0504B1471                 - 432 -

     1             (Base Construction Allocation -
     2             $291,000)
     3             (Land Allocation - $9,000)
     4             (Design and Contingencies - $53,000)
     5         (8)  Washington Township, T-397, Bridge
     6             over Deer Hole Creek, Bridge
     7             Replacement                                   517,000
     8             (Base Construction Allocation -
     9             $426,000)
    10             (Land Allocation - $13,000)
    11             (Design and Contingencies - $78,000)
    12         (9)  South Williamsport Borough, East
    13             Central Avenue, Bridge over Hagermans
    14             Run, Bridge Replacement                       519,000
    15             (Base Construction Allocation -
    16             $428,000)
    17             (Land Allocation - $13,000)
    18             (Design and Contingencies - $78,000)
    19         (10)  Moreland Township, T-443, Bridge over
    20             Little Muncy Creek, Bridge Replacement        780,000
    21             (Base Construction Allocation -
    22             $630,000)
    23             (Land Allocation - $20,000)
    24             (Design and Contingencies - $130,000)
    25         (11)  Muncy Creek Township, T-437, Bridge
    26             over Branch of Muncy Creek, Bridge
    27             Replacement                                   335,000
    28             (Base Construction Allocation -
    29             $268,000)
    30             (Land Allocation - $17,000)
    19990S0504B1471                 - 433 -

     1             (Design and Contingencies - $50,000)
     2         (12)  Muncy Creek Township, T-811, Bridge
     3             over Wolf Run, Bridge Replacement             150,000
     4             (Base Construction Allocation -
     5             $120,000)
     6             (Land Allocation - $10,000)
     7             (Design and Contingencies - $20,000)
     8         (13)  Pine Township, T-782, Lycoming County
     9             Bridge No.109 over Texas Creek, Bridge
    10             Replacement                                   537,000
    11             (Base Construction Allocation -
    12             $426,000)
    13             (Land Allocation - $6,000)
    14             (Design and Contingencies - $105,000)
    15         (14)  Lycoming Township, T-688, Horn Road
    16             Bridge over Little Gap Run, Bridge
    17             Replacement                                   310,000
    18             (Base Construction Allocation -
    19             $185,000)
    20             (Land Allocation - $25,000)
    21             (Design and Contingencies - $100,000)
    22         (15)  Penn Township, T-521, Bridge over
    23             Sugar Run, Bridge Replacement                 355,000
    24             (Base Construction Allocation -
    25             $225,000)
    26             (Land Allocation - $50,000)
    27             (Design and Contingencies - $80,000)
    28         (16)  Shrewsbury Township, T-650, Iron
    29             Bridge over Muncy Creek, Bridge
    30             Replacement                                   880,000
    19990S0504B1471                 - 434 -

     1             (Base Construction Allocation -
     2             $750,000)
     3             (Land Allocation - $20,000)
     4             (Design and Contingencies - $110,000)
     5         (17)  Washington Township, T-424, Bridge
     6             over White Deer Hole Creek, Bridge
     7             Replacement                                   380,000
     8         (18)  Wolf Township, T-270, Bridge over
     9             Gregs Run, Bridge Replacement                 500,000
    10         (19)  Woodward Township, T-367, Bridge over
    11             Quenshukeny Run, Bridge Replacement           480,000
    12         (20)  Woodward Township, T-369, Bridge over
    13             Quenshukeny Run, Bridge Replacement           500,000
    14     (b)  State Bridges
    15         (1)  SR 0220, Quenshukeny Run Bridge over
    16             Quenshukeny Run, Village of Linden,
    17             Bridge Replacement                            395,000
    18             (Base Construction Allocation -
    19             $316,000)
    20             (Land Allocation - $20,000)
    21             (Design and Contingencies - $59,000)
    22         (2)  SR 0973, Bridge over Hoagland Run, 3
    23             Miles West of Cogan Station, Bridge
    24             Rehabilitation                                195,000
    25             (Base Construction Allocation -
    26             $156,000)
    27             (Land Allocation - $10,000)
    28             (Design and Contingencies - $29,000)
    29         (3)  SR 1006, Wallis Run Bridge over Wallis
    30             Run, Cascade Township, Bridge
    19990S0504B1471                 - 435 -

     1             Replacement                                    65,000
     2             (Base Construction Allocation -
     3             $50,000)
     4             (Land Allocation - $5,000)
     5             (Design and Contingencies - $10,000)
     6         (4)  SR 2022, Mill Creek Bridge, North of
     7             Montoursville, Bridge Replacement             668,000
     8             (Base Construction Allocation -
     9             $575,000)
    10             (Land Allocation - $43,000)
    11             (Design and Contingencies - $50,000)
    12         (5)  SR 2051, Wolf Run Bridge over Wolf
    13             Run, South of SR 0220, Muncy Township,
    14             Bridge Replacement                            638,000
    15             (Base Construction Allocation -
    16             $510,000)
    17             (Land Allocation - $32,000)
    18             (Design and Contingencies - $96,000)
    19         (6)  SR 3024, Jobs Run Road Bridge over
    20             Tributary of Larrys Creek, East of
    21             Salladasburg, Bridge Replacement              108,000
    22             (Base Construction Allocation -
    23             $92,000)
    24             (Land Allocation - $8,000)
    25             (Design and Contingencies - $8,000)
    26         (7)  SR 3028, West 4th Street, Lycoming
    27             Creek Bridge, City of Williamsport,
    28             Bridge Rehabilitation                         216,000
    29             (Base Construction Allocation -
    30             $185,000)
    19990S0504B1471                 - 436 -

     1             (Land Allocation - $15,000)
     2             (Design and Contingencies - $16,000)
     3         (8)  SR 0044, Bridge over Conrail, Bridge
     4             Painting                                      210,000
     5             (Base Construction Allocation -
     6             $200,000)
     7             (Design and Contingencies - $10,000)
     8         (9)  SR 0180, I-180 Eastbound Bridge over
     9             Loyalsock Creek, Bridge Painting              135,000
    10             (Base Construction Allocation -
    11             $125,000)
    12             (Design and Contingencies - $10,000)
    13         (10)  SR 0180, I-180 Westbound Bridge over
    14             Loyalsock Creek, Bridge Painting              135,000
    15             (Base Construction Allocation -
    16             $125,000)
    17             (Design and Contingencies - $10,000)
    18         (11)  SR 2014, Bridge over Lycoming Creek,
    19             Bridge Painting                               780,000
    20             (Base Construction Allocation -
    21             $770,000)
    22             (Design and Contingencies - $10,000)
    23         (12)  SR 2061, Bridge over Little Muncy
    24             Creek, Bridge Painting                         80,000
    25             (Base Construction Allocation -
    26             $70,000)
    27             (Design and Contingencies - $10,000)
    28         (13)  SR 0014, SR 0014 over Trout Run,
    29             Lewis Township, Bridge Replacement            640,000
    30             (Base Construction Allocation -
    19990S0504B1471                 - 437 -

     1             $512,000)
     2             (Land Allocation - $32,000)
     3             (Design and Contingencies - $96,000)
     4         (14)  SR 0044, SR 0044 over Ramsey Run,
     5             Cummings Township, Bridge Replacement         394,000
     6             (Base Construction Allocation -
     7             $315,000)
     8             (Land Allocation - $20,000)
     9             (Design and Contingencies - $59,000)
    10         (15)  SR 0044, SR 0044 over Pine Bottom
    11             Run, Cummings Township, Bridge
    12             Replacement                                   360,000
    13             (Base Construction Allocation -
    14             $288,000)
    15             (Land Allocation - $18,000)
    16             (Design and Contingencies - $54,000)
    17         (16)  SR 0118, SR 0118 over Big Run,
    18             Franklin Township, Bridge Replacement         382,000
    19             (Base Construction Allocation -
    20             $307,000)
    21             (Land Allocation - $19,000)
    22             (Design and Contingencies - $56,000)
    23         (17)  SR 0284, SR 0284 over Blacks Creek,
    24             Pine Township, Bridge Replacement             700,000
    25             (Base Construction Allocation -
    26             $570,000)
    27             (Land Allocation - $30,000)
    28             (Design and Contingencies - $100,000)
    29         (18)  SR 0405, SR 0405 over West Branch of
    30             Susquehanna River, Muncy Creek
    19990S0504B1471                 - 438 -

     1             Township, Bridge Replacement               24,924,000
     2             (Base Construction Allocation -
     3             $19,939,000)
     4             (Land Allocation - $1,246,000)
     5             (Design and Contingencies - $3,739,000)
     6         (19)  SR 0654, SR 0654 over Mosquito Creek,
     7             Anthony Township, Bridge Replacement          674,000
     8             (Base Construction Allocation -
     9             $539,000)
    10             (Land Allocation - $34,000)
    11             (Design and Contingencies - $101,000)
    12         (20)  SR 0973, SR 0973 over Mud Run,
    13             Mifflin Township, Bridge Replacement          294,000
    14             (Base Construction Allocation -
    15             $252,000)
    16             (Land Allocation - $20,000)
    17             (Design and Contingencies - $22,000)
    18         (21)  SR 1005, SR 1005 over Plunketts
    19             Creek, Plunketts Creek Township, Bridge
    20             Replacement                                   366,000
    21             (Base Construction Allocation -
    22             $293,000)
    23             (Land Allocation - $18,000)
    24             (Design and Contingencies - $55,000)
    25         (22)  SR 2061, SR 2061 over Sugar Run,
    26             Moreland Township, Bridge Replacement         443,000
    27             (Base Construction Allocation -
    28             $354,000)
    29             (Land Allocation - $22,000)
    30             (Design and Contingencies - $67,000)
    19990S0504B1471                 - 439 -

     1         (23)  SR 2085, SR 2085 over Muncy Creek,
     2             Penn Township, Bridge Replacement           1,050,000
     3             (Base Construction Allocation -
     4             $840,000)
     5             (Land Allocation - $53,000)
     6             (Design and Contingencies - $157,000)
     7         (24)  SR 0405, East Water Street over Glade
     8             Run, Muncy Borough, Bridge Replacement        500,000
     9             (Base Construction Allocation -
    10             $350,000)
    11             (Land Allocation - $50,000)
    12             (Design and Contingencies - $100,000)
    13         (25)  SR 1003, Bridge over Wallis Run,
    14             Gamble Township, Bridge Replacement         1,020,000
    15             (Base Construction Allocation -
    16             $820,000)
    17             (Land Allocation - $50,000)
    18             (Design and Contingencies - $150,000)
    19         (26)  SR 1003, Bridge over Salt Run, Gamble
    20             Township, Bridge Replacement                  390,000
    21             (Base Construction Allocation -
    22             $300,000)
    23             (Land Allocation - $30,000)
    24             (Design and Contingencies - $60,000)
    25         (27)  US 15, Bridge over 2nd Avenue, South
    26             Williamsport Borough, Bridge
    27             Replacement                                 1,550,000
    28             (Base Construction Allocation -
    29             $1,250,000)
    30             (Land Allocation - $50,000)
    19990S0504B1471                 - 440 -

     1             (Design and Contingencies - $250,000)
     2         (28)  SR 44, Bridge over Conrail, Nippenose
     3             Township, Bridge Replacement                2,425,000
     4             (Base Construction Allocation -
     5             $2,000,000)
     6             (Land Allocation - $100,000)
     7             (Design and Contingencies - $325,000)
     8         (29)  US 220, Southbound Bridge over SR
     9             3005, Jersey Shore Borough, Deck
    10             Replacement                                   275,000
    11             (Base Construction Allocation -
    12             $225,000)
    13             (Design and Contingencies - $50,000)
    14         (30)  US 220, Northbound Bridge over
    15             Railroad, Porter Township, Bridge
    16             Replacement                                   900,000
    17             (Base Construction Allocation -
    18             $750,000)
    19             (Design and Contingencies - $150,000)
    20         (31)  US 220, Southbound Bridge over
    21             Railroad, Porter Township, Bridge
    22             Rehabilitation                                900,000
    23             (Base Construction Allocation -
    24             $750,000)
    25             (Design and Contingencies - $150,000)
    26         (32)  US 220, Northbound Bridge over SR
    27             3005, Jersey Shore Borough, Bridge
    28             Rehabilitation                                275,000
    29             (Base Construction Allocation -
    30             $225,000)
    19990S0504B1471                 - 441 -

     1             (Design and Contingencies - $50,000)
     2         (33)  US 220, Ramp on US 220, Jersey Shore
     3             Borough, Deck Replacement                   1,500,000
     4             (Base Construction Allocation -
     5             $1,250,000)
     6             (Design and Contingencies - $250,000)
     7         (34)  US 220, Northbound Bridge over Ramp
     8             A, Woodward Township, Bridge
     9             Rehabilitation                                550,000
    10             (Base Construction Allocation -
    11             $500,000)
    12             (Design and Contingencies - $50,000)
    13         (35)  US 220, Northbound Bridge over T-331,
    14             Woodward Township, Bridge
    15             Rehabilitation                                275,000
    16             (Base Construction Allocation -
    17             $250,000)
    18             (Design and Contingencies - $25,000)
    19         (36)  US 220, Northbound Bridge over
    20             Railroad, Woodward Township, Bridge
    21             Rehabilitation                                825,000
    22             (Base Construction Allocation -
    23             $750,000)
    24             (Design and Contingencies - $75,000)
    25         (37)  US 220, Southbound Bridge over Ramp,
    26             Woodward Township, Bridge
    27             Rehabilitation                                550,000
    28             (Base Construction Allocation -
    29             $500,000)
    30             (Design and Contingencies - $50,000)
    19990S0504B1471                 - 442 -

     1         (38)  US 220, Southbound Bridge over T-331,
     2             Woodward Township, Bridge
     3             Rehabilitation                                275,000
     4             (Base Construction Allocation -
     5             $250,000)
     6             (Design and Contingencies - $25,000)
     7         (39)  US 220, Southbound Bridge over
     8             Railroad, Woodward Township, Bridge
     9             Rehabilitation                                825,000
    10             (Base Construction Allocation -
    11             $750,000)
    12             (Design and Contingencies - $75,000)
    13         (40)  US 220, Reach Road over US 220, City
    14             of Williamsport, Deck Replacement           1,400,000
    15             (Base Construction Allocation -
    16             $1,250,000)
    17             (Design and Contingencies - $150,000)
    18         (41)  US 220, Northbound Bridge over Arch
    19             Street, City of Williamsport, Bridge
    20             Rehabilitation                                385,000
    21             (Base Construction Allocation -
    22             $350,000)
    23             (Design and Contingencies - $35,000)
    24         (42)  US 220, Southbound Bridge over Arch
    25             Street, City of Williamsport, Bridge
    26             Rehabilitation                                385,000
    27             (Base Construction Allocation -
    28             $350,000)
    29             (Design and Contingencies - $35,000)
    30         (43)  US 220, Northbound Bridge over
    19990S0504B1471                 - 443 -

     1             Lycoming Creek, City of Williamsport,
     2             Bridge Rehabilitation                       1,100,000
     3             (Base Construction Allocation -
     4             $1,000,000)
     5             (Design and Contingencies - $100,000)
     6         (44)  I-180, Eastbound Bridge over Maynard
     7             Street, City of Williamsport, Bridge
     8             Widening and Deck Replacement                 950,000
     9             (Base Construction Allocation -
    10             $800,000)
    11             (Design and Contingencies - $150,000)
    12         (45)  I-180, Westbound Bridge over Maynard
    13             Street, City of Williamsport, Bridge
    14             Widening and Deck Replacement                 950,000
    15             (Base Construction Allocation -
    16             $800,000)
    17             (Design and Contingencies - $150,000)
    18         (46)  I-180, Eastbound and Westbound
    19             Bridges over Railroad, City of
    20             Williamsport, Bridge Widening and Deck
    21             Replacement                                   900,000
    22             (Base Construction Allocation -
    23             $750,000)
    24             (Design and Contingencies - $150,000)
    25         (47)  I-180, Eastbound Bridge over Hepburn
    26             Street, City of Williamsport, Bridge
    27             Widening and Deck Replacement               1,200,000
    28             (Base Construction Allocation -
    29             $1,000,000)
    30             (Design and Contingencies - $200,000)
    19990S0504B1471                 - 444 -

     1         (48)  I-180, Westbound Bridge over Hepburn
     2             Street, City of Williamsport, Bridge
     3             Widening and Deck Replacement               1,200,000
     4             (Base Construction Allocation -
     5             $1,000,000)
     6             (Design and Contingencies - $200,000)
     7         (49)  I-180, Eastbound Bridge over Basin
     8             Street, City of Williamsport, Bridge
     9             Rehabilitation                                550,000
    10             (Base Construction Allocation -
    11             $500,000)
    12             (Design and Contingencies - $50,000)
    13         (50)  I-180, Westbound Bridge over Basin
    14             Street, City of Williamsport, Bridge
    15             Rehabilitation                                550,000
    16             (Base Construction Allocation -
    17             $500,000)
    18             (Design and Contingencies - $50,000)
    19         (51)  I-180, Eastbound and Westbound
    20             Bridges over Muncy Creek, Muncy Creek
    21             Township, Bridge Rehabilitation             1,100,000
    22             (Base Construction Allocation -
    23             $1,000,000)
    24             (Design and Contingencies - $100,000)
    25         (52)  I-180, Eastbound and Westbound
    26             Bridges over PA 405, Muncy Creek
    27             Township, Bridge Rehabilitation             1,100,000
    28             (Base Construction Allocation -
    29             $1,000,000)
    30             (Design and Contingencies - $100,000)
    19990S0504B1471                 - 445 -

     1         (53)  I-180, Eastbound Bridge over SR 4024,
     2             Muncy Creek Township, Bridge
     3             Rehabilitation                                550,000
     4             (Base Construction Allocation -
     5             $500,000)
     6             (Design and Contingencies - $50,000)
     7         (54)  I-180, Eastbound and Westbound
     8             Bridges over SR 2061, Muncy Creek
     9             Township, Bridge Rehabilitation               660,000
    10             (Base Construction Allocation -
    11             $600,000)
    12             (Design and Contingencies - $60,000)
    13         (55)  I-180, Eastbound and Westbound
    14             Bridges over SR 2014, Muncy Creek
    15             Township, Bridge Rehabilitation               660,000
    16             (Base Construction Allocation -
    17             $600,000)
    18             (Design and Contingencies - $60,000)
    19         (56)  SR 0180, I-180 Bridge over Loyalsock
    20             Creek, Loyalsock Township and
    21             Montoursville Borough, Bridge
    22             Rehabilitation                                800,000
    23             (Base Construction Allocation -
    24             $750,000)
    25             (Design and Contingencies - $50,000)
    26         (57)  SR 0973, Hoagland Run Bridge over
    27             Hoagland Run, Lycoming Township, Bridge
    28             Replacement                                   620,000
    29             (Base Construction Allocation -
    30             $500,000)
    19990S0504B1471                 - 446 -

     1             (Land Allocation - $20,000)
     2             (Design and Contingencies - $100,000)
     3         (58)  SR 2039, Mill Creek Bridge over Mill
     4             Creek, Loyalsock Township, Bridge
     5             Replacement                                   840,000
     6             (Base Construction Allocation -
     7             $680,000)
     8             (Land Allocation - $30,000)
     9             (Design and Contingencies - $130,000)
    10         (59)  SR 8028, Ramp Bridge over Ramp N,
    11             Platt Township, Bridge Deck
    12             Replacement                                 1,500,000
    13             (Base Construction Allocation -
    14             $1,400,000)
    15             (Design and Contingencies - $100,000)
    16         (60)  I-180, Halls Station to
    17             Northumberland County Line, Muncy Creek
    18             Township, 11 Structures, Bridge
    19             Rehabilitation                              3,400,000
    20             (Base Construction Allocation -
    21             $3,200,000)
    22             (Design and Contingencies - $200,000)
    23         (61)  SR 2049 over I-180, Bridge
    24             Rehabilitation                              3,000,000
    25             (Base Construction Allocation -
    26             $2,500,000)
    27             (Design and Contingencies - $500,000)
    28         (62)  Various Bridges Rehabilitation              382,000
    29  Section 46.  McKean County.
    30     (a)  Local Bridges
    19990S0504B1471                 - 447 -

     1         (1)  Foster Township, T-359, Garlock Hollow
     2             Bridge over Kendall Creek, Bridge
     3             Replacement                                   580,000
     4             (Base Construction Allocation -
     5             $400,000)
     6             (Land Allocation - $20,000)
     7             (Design and Contingencies - $160,000)
     8     (b)  State Bridges
     9         (1)  SR 3009, Kinzua Creek Bridge over
    10             Kinzua Creek, Borough of Mt. Jewett,
    11             Bridge Replacement                            880,000
    12             (Base Construction Allocation -
    13             $700,000)
    14             (Land Allocation - $30,000)
    15             (Design and Contingencies - $150,000)
    16         (2)  SR 4005, Kendall Creek Bridge over
    17             Kendall Creek, City of Bradford, Bridge
    18             Replacement                                   800,000
    19             (Base Construction Allocation -
    20             $650,000)
    21             (Land Allocation - $50,000)
    22             (Design and Contingencies - $100,000)
    23         (3)  SR 9900, Kings Run Bridge over Kings
    24             Run, Ceres Township, Bridge
    25             Replacement                                   370,000
    26             (Base Construction Allocation -
    27             $280,000)
    28             (Land Allocation - $10,000)
    29             (Design and Contingencies - $80,000)
    30         (4)  SR 1002, Annin Creek Bridge, Annin
    19990S0504B1471                 - 448 -

     1             Township, Bridge Replacement                  468,000
     2             (Base Construction Allocation -
     3             $373,000)
     4             (Land Allocation - $15,000)
     5             (Design and Contingencies - $80,000)
     6         (5)  SR 0006, Bridge over Potato Creek,
     7             Keating Township, Bridge Replacement          300,000
     8             (Base Construction Allocation -
     9             $240,000)
    10             (Land Allocation - $20,000)
    11             (Design and Contingencies - $40,000)
    12         (6)  SR 0646, Pennbrook Run Bridge over
    13             Pennbrook Run, Village of Gilmore,
    14             Foster Township, Bridge Replacement           114,000
    15             (Base Construction Allocation -
    16             $90,000)
    17             (Land Allocation - $4,000)
    18             (Design and Contingencies - $20,000)
    19         (7)  SR 1002, Potato Creek Bridge over
    20             Potato Creek, Keating Township, Bridge
    21             Painting                                      410,000
    22             (Base Construction Allocation -
    23             $400,000)
    24             (Design and Contingencies - $10,000)
    25  Section 47.  Mercer County.
    26     (a)  Local Bridges
    27         (1)  City of Sharon, Service Avenue Bridge
    28             over Pine Run, Bridge Replacement             240,000
    29             (Base Construction Allocation -
    30             $210,000)
    19990S0504B1471                 - 449 -

     1             (Land Allocation - $5,000)
     2             (Design and Contingencies - $25,000)
     3         (2)  City of Sharon, Wengler Avenue Bridge
     4             over Pine Hollow Run, Bridge
     5             Replacement                                   218,000
     6             (Base Construction Allocation -
     7             $193,000)
     8             (Land Allocation - $5,000)
     9             (Design and Contingencies - $20,000)
    10         (3)  Pine Township, T-355, Pinchlong Road
    11             Bridge over Swamp Run, Bridge
    12             Replacement                                   203,000
    13             (Base Construction Allocation -
    14             $178,000)
    15             (Land Allocation - $5,000)
    16             (Design and Contingencies - $20,000)
    17         (4)  Pine Township, T-878, Diamond Road
    18             Bridge over Wolf Creek, Bridge
    19             Replacement                                 1,813,000
    20             (Base Construction Allocation -
    21             $1,668,000)
    22             (Land Allocation - $60,000)
    23             (Design and Contingencies - $85,000)
    24         (5)  Pine Township, T-413, Daugherty Road
    25             Bridge over Wolf Run, Bridge
    26             Replacement                                   407,000
    27             (Base Construction Allocation -
    28             $352,000)
    29             (Land Allocation - $15,000)
    30             (Design and Contingencies - $40,000)
    19990S0504B1471                 - 450 -

     1         (6)  Shenango Township, T-955, Oak Hill
     2             Road Bridge over Turkey Run, Bridge
     3             Replacement                                   297,000
     4             (Base Construction Allocation -
     5             $257,000)
     6             (Land Allocation - $10,000)
     7             (Design and Contingencies - $30,000)
     8         (7)  Shenango Township, Heasley Road Bridge
     9             over Tributary of Shenango River,
    10             Bridge Replacement                            173,000
    11             (Base Construction Allocation -
    12             $155,000)
    13             (Land Allocation - $3,000)
    14             (Design and Contingencies - $15,000)
    15         (8)  Springfield Township, T-722, Spring
    16             Road Bridge over Mill Run, Bridge
    17             Replacement                                   230,000
    18             (Base Construction Allocation -
    19             $200,000)
    20             (Land Allocation - $5,000)
    21             (Design and Contingencies - $25,000)
    22         (9)  Worth Township, T-912, Jack Atwell
    23             Road Bridge over Wolf Creek, Bridge
    24             Replacement                                   297,000
    25             (Base Construction Allocation -
    26             $257,000)
    27             (Land Allocation - $10,000)
    28             (Design and Contingencies - $30,000)
    29         (10)  Springfield Township, North Spring
    30             Road Bridge, Bridge Replacement               245,000
    19990S0504B1471                 - 451 -

     1             (Base Construction Allocation -
     2             $210,000)
     3             (Land Allocation - $5,000)
     4             (Design and Contingencies - $30,000)
     5         (11)  Delaware Township, T-634, Redfoot
     6             Road Bridge over Otter Creek, Bridge
     7             Replacement                                   220,000
     8             (Base Construction Allocation -
     9             $185,000)
    10             (Land Allocation - $5,000)
    11             (Design and Contingencies - $30,000)
    12         (12)  Fairview Township, T-623, Runkle Lane
    13             Bridge over Coolspring Creek, Bridge
    14             Replacement                                   220,000
    15             (Base Construction Allocation -
    16             $185,000)
    17             (Land Allocation - $5,000)
    18             (Design and Contingencies - $30,000)
    19         (13)  City of Hermitage, T-307, Lynnwood
    20             Drive Bridge over Bobby Run, Bridge
    21             Replacement                                   244,000  <--
    22             (Base Construction Allocation -
    23             $210,000)
    24             (Land Allocation - $3,000)
    25             (Design and Contingencies - $31,000)
    26             REPLACEMENT                                   308,000  <--
    27             (BASE CONSTRUCTION ALLOCATION -
    28             $270,000)
    29             (LAND ALLOCATION - $3,000)
    30             (DESIGN AND CONTINGENCIES - $35,000)
    19990S0504B1471                 - 452 -

     1         (14)  Sharon City, Prindle Street Bridge
     2             over Pine Run, Bridge Replacement             485,000
     3             (Base Construction Allocation -
     4             $405,000)
     5             (Land Allocation - $20,000)
     6             (Design and Contingencies - $60,000)
     7     (b)  State Bridges
     8         (1)  SR 0058, SR 0058 over Sugar Creek,
     9             Greene Township, Bridge Replacement           270,000
    10             (Base Construction Allocation -
    11             $200,000)
    12             (Land Allocation - $20,000)
    13             (Design and Contingencies - $50,00)
    14         (2)  SR 0058, SR 0058 over Tributary of
    15             Shenango River, Greenville Borough,
    16             Bridge Replacement                            250,000
    17             (Base Construction Allocation -
    18             $200,000)
    19             (Land Allocation - $20,000)
    20             (Design and Contingencies - $30,000)
    21         (3)  SR 0058, SR 0058 over I-79, Findley
    22             Township, Bridge Replacement                1,630,000
    23             (Base Construction Allocation -
    24             $1,500,000)
    25             (Land Allocation - $30,000)
    26             (Design and Contingencies - $100,000)
    27         (4)  SR 0062, SR 0062 over Shenango
    28             River/Riverside Drive, City of Sharon,
    29             Bridge Replacement                          2,780,000
    30             (Base Construction Allocation -
    19990S0504B1471                 - 453 -

     1             $2,500,000)
     2             (Land Allocation - $30,000)
     3             (Design and Contingencies - $250,000)
     4         (5)  SR 0158, SR 0158 over Little
     5             Neshannock Creek, Wilmington Township,
     6             Bridge Replacement                            770,000
     7             (Base Construction Allocation -
     8             $650,000)
     9             (Land Allocation - $40,000)
    10             (Design and Contingencies - $80,000)
    11         (6)  SR 0173, SR 0173 over Mill Creek, New
    12             Lebanon Borough, Bridge Replacement           430,000
    13             (Base Construction Allocation -
    14             $350,000)
    15             (Land Allocation - $20,000)
    16             (Design and Contingencies - $60,000)
    17         (7)  SR 0208, SR 0208 over Wolf Creek,
    18             Grove City Borough, Bridge Replacement      1,000,000
    19             (Base Construction Allocation -
    20             $870,000)
    21             (Land Allocation - $30,000)
    22             (Design and Contingencies - $100,000)
    23         (8)  SR 0258, SR 0258 over Daley Run,
    24             Jefferson Township, Bridge Replacement        430,000
    25             (Base Construction Allocation -
    26             $350,000)
    27             (Land Allocation - $20,000)
    28             (Design and Contingencies - $60,000)
    29         (9)  SR 0318, SR 0318 over Shenango
    30             River/Street/Railroad, West Middlesex
    19990S0504B1471                 - 454 -

     1             Borough, Bridge Replacement                 4,400,000
     2             (Base Construction Allocation -
     3             $3,700,000)
     4             (Land Allocation - $100,000)
     5             (Design and Contingencies - $600,000)
     6         (10)  SR 0518, SR 0518 over Pine Hollow
     7             Run, City of Hermitage, Bridge
     8             Replacement                                   410,000
     9             (Base Construction Allocation -
    10             $300,000)
    11             (Land Allocation - $30,000)
    12             (Design and Contingencies - $80,000)
    13         (11)  SR 0846, SR 0846 over Shenango
    14             Reservoir, South Pymatuning Township,
    15             Bridge Replacement                          1,500,000
    16             (Base Construction Allocation -
    17             $1,340,000)
    18             (Land Allocation - $10,000)
    19             (Design and Contingencies - $150,000)
    20         (12)  SR 2006, SR 2006 over I-79,
    21             Springfield Township, Bridge
    22             Replacement                                 1,100,000
    23             (Base Construction Allocation -
    24             $1,000,000)
    25             (Land Allocation - $10,000)
    26             (Design and Contingencies - $90,000)
    27         (13)  SR 2014, SR 2014 over Mill Creek,
    28             Findley Township, Bridge Replacement          330,000
    29             (Base Construction Allocation -
    30             $240,000)
    19990S0504B1471                 - 455 -

     1             (Land Allocation - $20,000)
     2             (Design and Contingencies - $70,000)
     3         (14)  SR 2025, SR 2025 over Lake Barmore
     4             Outlet, Pine Township, Bridge
     5             Replacement                                   300,000
     6             (Base Construction Allocation -
     7             $230,000)
     8             (Land Allocation - $10,000)
     9             (Design and Contingencies - $60,000)
    10         (15)  SR 3011, SR 3011 over I-80, Shenango
    11             Township, Bridge Replacement                  810,000
    12             (Base Construction Allocation -
    13             $700,000)
    14             (Land Allocation - $10,000)
    15             (Design and Contingencies - $100,000)
    16         (16)  SR 4014, SR 4014 over Shenango River,
    17             Delaware Township, Bridge Replacement         920,000
    18             (Base Construction Allocation -
    19             $800,000)
    20             (Land Allocation - $20,000)
    21             (Design and Contingencies - $100,000)
    22         (17)  SR 0518, PA 516 (Walnut Street)
    23             Bridge over Pine Hollow Road, City of
    24             Hermitage, Bridge Replacement                 550,000
    25             (Base Construction Allocation -
    26             $500,000)
    27             (Design and Contingencies - $50,000)
    28         (18)  SR 4003, Wasser Bridge Road Bridge
    29             over Shenango River, West Salem
    30             Township, Bridge Replacement                1,620,000
    19990S0504B1471                 - 456 -

     1             (Base Construction Allocation -
     2             $1,500,000)
     3             (Land Allocation - $40,000)
     4             (Design and Contingencies - $80,000)
     5         (19)  SR 0080, Bridges over Wolf Creek,
     6             Wolf Creek Township, Bridge
     7             Rehabilitation                              2,120,000
     8             (Base Construction Allocation -
     9             $2,000,000)
    10             (Land Allocation - $20,000)
    11             (Design and Contingencies - $100,000)
    12         (20)  SR 0080, Bridges over T-998, Wolf
    13             Creek Township, Bridge Rehabilitation       2,120,000
    14             (Base Construction Allocation -
    15             $2,000,000)
    16             (Land Allocation - $20,000)
    17             (Design and Contingencies - $100,000)
    18         (21)  SR 0208, Bridge over I-79,
    19             Springfield Township, Bridge
    20             Replacement                                 4,000,000
    21             (Base Construction Allocation -
    22             $3,600,000)
    23             (Land Allocation - $200,000)
    24             (Design and Contingencies - $200,000)
    25         (22)  SR 2007, Bridge over Mill Creek,
    26             Findley Township, Bridge Replacement          200,000
    27             (Base Construction Allocation -
    28             $100,000)
    29             (Land Allocation - $20,000)
    30             (Design and Contingencies - $80,000)
    19990S0504B1471                 - 457 -

     1         (23)  SR 2009, Bridge over Wolf Creek, Wolf
     2             Creek Township, Bridge Replacement            600,000
     3             (Base Construction Allocation -
     4             $500,000)
     5             (Land Allocation - $20,000)
     6             (Design and Contingencies - $80,000)
     7         (24)  SR 2009, Bridge over Centertown Run,
     8             Wolf Creek Township, Bridge
     9             Replacement                                   500,000
    10             (Base Construction Allocation -
    11             $400,000)
    12             (Land Allocation - $20,000)
    13             (Design and Contingencies - $80,000)
    14         (25)  SR 2013, Bridge over Munnel Run,
    15             Mercer Borough, Bridge Replacement            200,000
    16             (Base Construction Allocation -
    17             $100,000)
    18             (Land Allocation - $20,000)
    19             (Design and Contingencies - $80,000)
    20         (26)  SR 2016, Church Road Bridge, Findley
    21             Township, Bridge Replacement                  400,000
    22             (Base Construction Allocation -
    23             $320,000)
    24             (Land Allocation - $20,000)
    25             (Design and Contingencies - $60,000)
    26         (27)  SR 2024, Bridge over Wolf Creek,
    27             Worth Township, Bridge Replacement            300,000
    28             (Base Construction Allocation -
    29             $200,000)
    30             (Land Allocation - $20,000)
    19990S0504B1471                 - 458 -

     1             (Design and Contingencies - $80,000)
     2         (28)  SR 2025, Bridge over Black Run,
     3             Liberty Township, Bridge Replacement          500,000
     4             (Base Construction Allocation -
     5             $400,000)
     6             (Land Allocation - $20,000)
     7             (Design and Contingencies - $80,000)
     8         (29)  SR 3008, Bridge over Small Stream,
     9             Hermitage Township, Bridge Replacement        400,000
    10             (Base Construction Allocation -
    11             $300,000)
    12             (Land Allocation - $20,000)
    13             (Design and Contingencies - $80,000)
    14         (30)  SR 3013, Bridge over Tributary of
    15             Little Neshannock Creek, Wilmington
    16             Township, Bridge Replacement                  200,000
    17             (Base Construction Allocation -
    18             $100,000)
    19             (Land Allocation - $20,000)
    20             (Design and Contingencies - $80,000)
    21         (31)  SR 3018, Bridge over Shenango River,
    22             Sharpsville Borough, Bridge
    23             Replacement                                 4,920,000
    24             (Base Construction Allocation -
    25             $4,400,000)
    26             (Land Allocation - $20,000)
    27             (Design and Contingencies - $500,000)
    28         (32)  SR 3020, Bridge over Tributary of
    29             Shenango River, Jefferson Township,
    30             Bridge Replacement                            200,000
    19990S0504B1471                 - 459 -

     1             (Base Construction Allocation -
     2             $100,000)
     3             (Land Allocation - $20,000)
     4             (Design and Contingencies - $80,000)
     5         (33)  SR 3020, Bridge over Lackawannock
     6             Creek, Jefferson Township, Bridge
     7             Replacement                                   300,000
     8             (Base Construction Allocation -
     9             $200,000)
    10             (Land Allocation - $20,000)
    11             (Design and Contingencies - $80,000)
    12         (34)  SR 3030, Budd Street Bridge, Sharon
    13             Township, Bridge Rehabilitation             2,300,000
    14             (Base Construction Allocation -
    15             $2,000,000)
    16             (Land Allocation - $50,000)
    17             (Design and Contingencies - $250,000)
    18         (35)  SR 4021, Bridge over Morrison Run,
    19             Perry Township, Bridge Replacement            300,000
    20             (Base Construction Allocation -
    21             $200,000)
    22             (Land Allocation - $20,000)
    23             (Design and Contingencies - $80,000)
    24         (36)  SR 0080, I-80 Bridge over Hog Back
    25             Run, Shenango Township, Bridge
    26             Rehabilitation                                700,000
    27             (Base Construction Allocation -
    28             $550,000)
    29             (Land Allocation - $50,000)
    30             (Design and Contingencies - $100,000)
    19990S0504B1471                 - 460 -

     1         (37)  SR 0080, I-80 Eastbound Bridge over
     2             SR 0318, Shenango Township, Bridge
     3             Replacement                                 1,100,000
     4             (Base Construction Allocation -
     5             $950,000)
     6             (Land Allocation - $50,000)
     7             (Design and Contingencies - $100,000)
     8         (38)  SR 0080, I-80 Westbound Bridge over
     9             SR 0318, Shenango Township, Bridge
    10             Replacement                                 1,100,000
    11             (Base Construction Allocation -
    12             $950,000)
    13             (Land Allocation - $50,000)
    14             (Design and Contingencies - $100,000)
    15         (39)  SR 0173, Bridge over Black Run, Wolf
    16             Creek Township, Bridge Replacement            400,000
    17             (Base Construction Allocation -
    18             $300,000)
    19             (Land Allocation - $20,000)
    20             (Design and Contingencies - $80,000)
    21         (40)  SR 0173, Bridge over Sandy Creek,
    22             Sandy Lake Borough, Bridge Replacement      1,420,000
    23             (Base Construction Allocation -
    24             $1,200,000)
    25             (Land Allocation - $20,000)
    26             (Design and Contingencies - $200,000)
    27         (41)  SR 0208, Bridge over I-79,
    28             Springfield Township, Bridge
    29             Replacement                                 2,920,000
    30             (Base Construction Allocation -
    19990S0504B1471                 - 461 -

     1             $2,500,000)
     2             (Land Allocation - $20,000)
     3             (Design and Contingencies - $400,000)
     4         (42)  SR 0258, Bridge over Tinkers Run,
     5             Liberty Township, Bridge Replacement          200,000
     6             (Base Construction Allocation -
     7             $100,000)
     8             (Land Allocation - $20,000)
     9             (Design and Contingencies - $80,000)
    10         (43)  SR 0318, Bridge over SR 0060,
    11             Shenango Township, Bridge Replacement       2,700,000
    12             (Base Construction Allocation -
    13             $2,400,000)
    14             (Land Allocation - $50,000)
    15             (Design and Contingencies - $250,000)
    16         (44)  SR 0358, Bridge over Tributary of
    17             Little Shenango River, Otter Creek
    18             Township, Bridge Replacement                  300,000
    19             (Base Construction Allocation -
    20             $200,000)
    21             (Land Allocation - $20,000)
    22             (Design and Contingencies - $80,000)
    23         (45)  SR 0358, Bridge over Tributary of
    24             Shenango River, Otter Creek Township,
    25             Bridge Replacement                            200,000
    26             (Base Construction Allocation -
    27             $100,000)
    28             (Land Allocation - $20,000)
    29             (Design and Contingencies - $80,000)
    30         (46)  SR 0846, Bridge over Chestnut Run,
    19990S0504B1471                 - 462 -

     1             Pymatuning Township, Bridge
     2             Replacement                                   400,000
     3             (Base Construction Allocation -
     4             $300,000)
     5             (Land Allocation - $20,000)
     6             (Design and Contingencies - $80,000)
     7         (47)  SR 1004, Bridge over Coolspring
     8             Creek, Fairview Township, Bridge
     9             Replacement                                   200,000
    10             (Base Construction Allocation -
    11             $100,000)
    12             (Land Allocation - $20,000)
    13             (Design and Contingencies - $80,000)
    14         (48)  SR 1011, Carpenters Corner Road,
    15             Bridge No.1, New Vernon Township,
    16             Bridge Replacement                            400,000
    17             (Base Construction Allocation -
    18             $300,000)
    19             (Land Allocation - $20,000)
    20             (Design and Contingencies - $80,000)
    21         (49)  SR 1011, Carpenters Corner Road,
    22             Bridge No.2, Perry Township, Bridge
    23             Replacement                                   400,000
    24             (Base Construction Allocation -
    25             $300,000)
    26             (Land Allocation - $20,000)
    27             (Design and Contingencies - $80,000)
    28         (50)  SR 1028, Bridge over North Deer
    29             Creek, Deer Creek Township, Bridge
    30             Replacement                                   300,000
    19990S0504B1471                 - 463 -

     1             (Base Construction Allocation -
     2             $200,000)
     3             (Land Allocation - $20,000)
     4             (Design and Contingencies - $80,000)
     5         (51)  SR 2001, Bridge over Indian Run,
     6             Wilmington Township, Bridge
     7             Replacement                                   200,000
     8             (Base Construction Allocation -
     9             $100,000)
    10             (Land Allocation - $20,000)
    11             (Design and Contingencies - $80,000)
    12         (52)  SR 2002, Bridge over Neshannock
    13             Creek, Springfield Township, Bridge
    14             Replacement                                   400,000
    15             (Base Construction Allocation -
    16             $300,000)
    17             (Land Allocation - $20,000)
    18             (Design and Contingencies - $80,000)
    19         (53)  SR 2006, Blacktown Road Bridge over
    20             SR 0080, Springfield Township, Bridge
    21             Rehabilitation                              2,800,000
    22             (Base Construction Allocation -
    23             $2,500,000)
    24             (Land Allocation - $50,000)
    25             (Design and Contingencies - $250,000)
    26         (54)  SR 0018, Thiel College Bridge over
    27             Little Shenango, Greenville Borough,
    28             Bridge Replacement                          1,021,000
    29             (Base Construction Allocation -
    30             $1,000,000)
    19990S0504B1471                 - 464 -

     1             (Land Allocation - $20,000)
     2             (Design and Contingencies - $1,000)
     3         (55)  SR 0058, Bridge over Wolf Creek,
     4             Grove City Borough, Bridge Replacement      1,420,000
     5             (Base Construction Allocation -
     6             $1,200,000)
     7             (Land Allocation - $20,000)
     8             (Design and Contingencies - $200,000)
     9         (56)  SR 0060, Bridge over Hewitt Road,
    10             Shenango Township, Bridge Replacement       1,120,000
    11             (Base Construction Allocation -
    12             $1,000,000)
    13             (Land Allocation - $20,000)
    14             (Design and Contingencies - $100,000)
    15         (57)  SR 0060, Bridge over Hog Back Run,
    16             Shenango Township, Bridge Replacement         400,000
    17             (Base Construction Allocation -
    18             $300,000)
    19             (Land Allocation - $20,000)
    20             (Design and Contingencies - $80,000)
    21         (58)  SR 0060, Northbound Bridge over I-80
    22             Eastbound and Westbound, Shenango
    23             Township, Bridge Replacement                3,850,000
    24             (Base Construction Allocation -
    25             $3,600,000)
    26             (Land Allocation - $50,000)
    27             (Design and Contingencies - $200,000)
    28         (59)  SR 0060, Southbound Bridge over I-80
    29             Eastbound and Westbound, Shenango
    30             Township, Bridge Replacement                3,850,000
    19990S0504B1471                 - 465 -

     1             (Base Construction Allocation -
     2             $3,600,000)
     3             (Land Allocation - $50,000)
     4             (Design and Contingencies - $200,000)
     5         (60)  SR 0060, Bridge over SR 0018,
     6             Shenango Township, Bridge Replacement       1,800,000
     7             (Base Construction Allocation -
     8             $1,600,000)
     9             (Land Allocation - $50,000)
    10             (Design and Contingencies - $150,000)
    11         (61)  SR 0062, Bridge over Pine Run, Sharon
    12             Township, Bridge Rehabilitation               200,000
    13             (Base Construction Allocation -
    14             $100,000)
    15             (Land Allocation - $20,000)
    16             (Design and Contingencies - $80,000)
    17         (62)  SR 0062, Bridge over Pine Run, Sharon
    18             Township, Bridge Replacement                  300,000
    19             (Base Construction Allocation -
    20             $200,000)
    21             (Land Allocation - $20,000)
    22             (Design and Contingencies - $80,000)
    23         (63)  SR 0062, Bridge over Pine Run, Sharon
    24             Township, Bridge Replacement                  500,000
    25             (Base Construction Allocation -
    26             $400,000)
    27             (Land Allocation - $20,000)
    28             (Design and Contingencies - $80,000)
    29         (64)  SR 0062, Bridge over Pine Run,
    30             Hermitage Township, Bridge Replacement        300,000
    19990S0504B1471                 - 466 -

     1             (Base Construction Allocation -
     2             $200,000)
     3             (Land Allocation - $20,000)
     4             (Design and Contingencies - $80,000)
     5         (65)  SR 0062, Bridge over Pine Run,
     6             Hermitage Township, Bridge Replacement        300,000
     7             (Base Construction Allocation -
     8             $200,000)
     9             (Land Allocation - $20,000)
    10             (Design and Contingencies - $80,000)
    11         (66)  SR 0062, Bridge over Pine Hollow
    12             Creek, Hermitage Township, Bridge
    13             Replacement                                   300,000
    14             (Base Construction Allocation -
    15             $200,000)
    16             (Land Allocation - $20,000)
    17             (Design and Contingencies - $80,000)
    18         (67)  SR 0062, Bridge over I-79 Northbound
    19             and Southbound, Jackson Township,
    20             Bridge Replacement                          6,720,000
    21             (Base Construction Allocation -
    22             $6,000,000)
    23             (Land Allocation - $20,000)
    24             (Design and Contingencies - $700,000)
    25         (68)  SR 0079, I-79 Bridge over Pine Run,
    26             Findley Township, Bridge Replacement          300,000
    27             (Base Construction Allocation -
    28             $200,000)
    29             (Land Allocation - $20,000)
    30             (Design and Contingencies - $80,000)
    19990S0504B1471                 - 467 -

     1         (69)  SR 0079, I-79 Northbound Bridge over
     2             Conrail and Yellow Creek, Jackson
     3             Township, Bridge Replacement                  300,000
     4             (Base Construction Allocation -
     5             $100,000)
     6             (Land Allocation - $50,000,)
     7             (Design and Contingencies - $150,000)
     8         (70)  SR 0079, I-79 Southbound Bridge over
     9             Conrail and Yellow Creek, Jackson
    10             Township, Bridge Replacement                1,200,000
    11             (Base Construction Allocation -
    12             $1,000,000)
    13             (Land Allocation - $50,000)
    14             (Design and Contingencies - $150,000)
    15         (71)  SR 0079, I-79 Bridge over Conrail,
    16             Lake Township, Bridge Replacement           3,720,000
    17             (Base Construction Allocation -
    18             $3,300,000)
    19             (Land Allocation - $20,000)
    20             (Design and Contingencies - $400,000)
    21         (72)  SR 0079, I-79 Southbound Bridge over
    22             Sandy Creek, New Vernon Township,
    23             Bridge Replacement                          5,320,000
    24             (Base Construction Allocation -
    25             $4,800,000)
    26             (Land Allocation - $20,000)
    27             (Design and Contingencies - $500,000)
    28  Section 48.  Mifflin County.
    29     (a)  Local Bridges
    30         (1)  Oliver Township, T-803, Bridge over
    19990S0504B1471                 - 468 -

     1             Musser Run, Bridge Replacement                492,000
     2             (Base Construction Allocation -
     3             $390,000)
     4             (Land Allocation - $2,000)
     5             (Design and Contingencies - $100,000)
     6         (2)  Decatur Township, T-379, Bridge over
     7             Meadow Creek, Bridge Replacement              370,000
     8             (Base Construction Allocation -
     9             $300,000)
    10             (Land Allocation - $10,000)
    11             (Design and Contingencies - $60,000)
    12         (3)  Burnham Borough, T-782, Buck Run
    13             Bridge over Buck Run, Bridge
    14             Replacement                                   892,000
    15             (Base Construction Allocation -
    16             $672,000)
    17             (Land Allocation - $20,000)
    18             (Design and Contingencies - $200,000)
    19         (4)  Menno Township, T-340, Kish Creek
    20             Bridge over Kish Creek, Bridge
    21             Replacement                                   262,000
    22             (Base Construction Allocation -
    23             $180,000)
    24             (Land Allocation - $10,000)
    25             (Design and Contingencies - $72,000)
    26         (5)  Oliver Township, T-702, Town Run
    27             Bridge over Town Run, Bridge
    28             Replacement                                   340,000
    29             (Base Construction Allocation -
    30             $250,000)
    19990S0504B1471                 - 469 -

     1             (Land Allocation - $10,000)
     2             (Design and Contingencies - $80,000)
     3         (6)  Wayne Township, T-357, Beaverdam Run
     4             Bridge over Beaverdam Run, Bridge
     5             Replacement                                   240,000
     6             (Base Construction Allocation -
     7             $160,000)
     8             (Land Allocation - $20,000)
     9             (Design and Contingencies - $60,000)
    10         (7)  Wayne Township, T-343, Long Hollow Run
    11             Bridge over Long Hollow Run, Bridge
    12             Rehabilitation                                240,000
    13             (Base Construction Allocation -
    14             $140,000)
    15             (Land Allocation - $20,000)
    16             (Design and Contingencies - $80,000)
    17         (8)  Wayne Township, T-357, Bridge over
    18             Beaver Dam Run, Bridge Replacement            376,000
    19     (b)  State Bridges
    20         (1)  SR 0022, Bridge over Kish Creek,
    21             Lewistown Borough, Bridge Painting            800,000
    22             (Base Construction Allocation -
    23             $720,000)
    24             (Design and Contingencies - $80,000)
    25         (2)  SR 3017, Bridge over Juniata River,
    26             Wayne Township, Bridge Painting               935,000
    27             (Base Construction Allocation -
    28             $850,000)
    29             (Design and Contingencies - $85,000)
    30         (3)  SR 0022, Strodes Run Bridge over
    19990S0504B1471                 - 470 -

     1             Strodes Run, Granville Township, Bridge
     2             Replacement                                   665,000
     3             (Base Construction Allocation -
     4             $445,000)
     5             (Land Allocation - $20,000)
     6             (Design and Contingencies - $200,000)
     7         (4)  SR 0022, Bridge over Kishacaquillas
     8             Creek, Lewistown Borough, Bridge
     9             Painting                                      610,000
    10             (Base Construction Allocation -
    11             $600,000)
    12             (Design and Contingencies - $10,000)
    13         (5)  SR 0305, Little Kish Creek Bridge over
    14             Little Kish Creek, Belleville Borough,
    15             Bridge Replacement                            980,000
    16             (Base Construction Allocation -
    17             $800,000)
    18             (Land Allocation - $30,000)
    19             (Design and Contingencies - $150,000)
    20         (6)  SR 0322, Bridge over Kish Creek and
    21             Conrail, Brown Township, Bridge
    22             Replacement                                 9,300,000
    23             (Base Construction Allocation -
    24             $8,800,000)
    25             (Land Allocation - $100,000)
    26             (Design and Contingencies - $400,000)
    27         (7)  SR 0322, Bridge over T-315 and Jacks
    28             Creek, Derry Township and Lewistown,
    29             Bridge Replacement                          5,300,000
    30             (Base Construction Allocation -
    19990S0504B1471                 - 471 -

     1             $4,800,000)
     2             (Land Allocation - $100,000)
     3             (Design and Contingencies - $400,000)
     4         (8)  SR 0655, Coffee Run Bridge over Coffee
     5             Run, Brown Township, Bridge
     6             Replacement                                   486,000
     7             (Base Construction Allocation -
     8             $376,000)
     9             (Land Allocation - $10,000)
    10             (Design and Contingencies - $100,000)
    11         (9)  SR 0655, Little Kish Creek Bridge over
    12             Little Kish Creek, Union Township,
    13             Bridge Replacement                            390,000
    14             (Base Construction Allocation -
    15             $280,000)
    16             (Land Allocation - $10,000)
    17             (Design and Contingencies - $100,000)
    18         (10)  SR 1002, Honey Creek Bridge No.4 over
    19             Honey Creek, Armagh Township, Bridge
    20             Replacement                                   750,000
    21             (Base Construction Allocation -
    22             $600,000)
    23             (Land Allocation - $75,000)
    24             (Design and Contingencies - $75,000)
    25         (11)  SR 1005, Tea Creek Bridge over Tea
    26             Creek, Brown Township, Bridge
    27             Replacement                                   460,000
    28             (Base Construction Allocation -
    29             $350,000)
    30             (Land Allocation - $10,000)
    19990S0504B1471                 - 472 -

     1             (Design and Contingencies - $100,000)
     2         (12)  SR 1005, Bucks Run Bridge over Bucks
     3             Run, Burnham Borough, Bridge
     4             Replacement                                   820,000
     5             (Base Construction Allocation -
     6             $600,000)
     7             (Land Allocation - $20,000)
     8             (Design and Contingencies - $200,000)
     9         (13)  SR 2004, Jacks Creek Bridge over
    10             Jacks Creek, Derry Township, Bridge
    11             Replacement                                   720,000
    12             (Base Construction Allocation -
    13             $500,000)
    14             (Land Allocation - $20,000)
    15             (Design and Contingencies - $200,000)
    16         (14)  SR 3017, Juniata River Bridge over
    17             Juniata River, Wayne Township, Bridge
    18             Painting                                      815,000
    19             (Base Construction Allocation -
    20             $800,000)
    21             (Design and Contingencies - $15,000)
    22         (15)  SR 4007, Musser Run Bridge over
    23             Musser Run, Oliver Township, Bridge
    24             Replacement                                   240,000
    25             (Base Construction Allocation -
    26             $150,000)
    27             (Land Allocation - $10,000)
    28             (Design and Contingencies - $80,000)
    29         (16)  SR 4013, Strodes Run Bridge over
    30             Strodes Run, Derry Township, Bridge
    19990S0504B1471                 - 473 -

     1             Replacement                                   300,000
     2             (Base Construction Allocation -
     3             $200,000)
     4             (Land Allocation - $20,000)
     5             (Design and Contingencies - $80,000)
     6  Section 49.  Monroe County.
     7     (a)  Local Bridges
     8         (1)  Hamilton Township, T-202, Bridge over
     9             Lake Creek, Bridge Replacement                320,000
    10             (Base Construction Allocation -
    11             $270,000)
    12             (Land Allocation - $10,000)
    13             (Design and Contingencies - $40,000)
    14         (2)  Stroud Township, T-420, Bridge over
    15             Cherry Creek, Bridge Replacement              360,000
    16             (Base Construction Allocation -
    17             $230,000)
    18             (Land Allocation - $10,000)
    19             (Design and Contingencies - $120,000)
    20         (3)  Smithfield Township, T-539, Bridge
    21             over Marshalls Creek, Bridge
    22             Rehabilitation                                348,000
    23             (Base Construction Allocation -
    24             $288,000)
    25             (Land Allocation - $10,000)
    26             (Design and Contingencies - $50,000)
    27         (4)  Smithfield Township, T-522, Bridge
    28             over Marshalls Creek, Bridge
    29             Replacement                                   134,000
    30             (Base Construction Allocation -
    19990S0504B1471                 - 474 -

     1             $116,000)
     2             (Land Allocation - $6,000)
     3             (Design and Contingencies - $12,000)
     4         (5)  Barrett Township, T-612, Bridge over
     5             Brodhead Creek, Bridge Replacement            174,000
     6             (Base Construction Allocation -
     7             $152,000)
     8             (Land Allocation - $7,000)
     9             (Design and Contingencies - $15,000)
    10         (6)  Hamilton Township, T-414, County
    11             Bridge No.7 over McMichael Creek,
    12             Bridge Replacement                          1,070,000
    13             (Base Construction Allocation -
    14             $840,000)
    15             (Land Allocation - $30,000)
    16             (Design and Contingencies - $200,000)
    17         (7)  Tunkhannock Township, T-633, Bridge
    18             over Tunkhannock Creek, Bridge
    19             Replacement                                   139,000
    20             (Base Construction Allocation -
    21             $121,000)
    22             (Land Allocation - $6,000)
    23             (Design and Contingencies - $12,000)
    24         (8)  Hamilton Township, T-233, County
    25             Bridge No.9 over McMichael Creek,
    26             Bridge Replacement                            665,000
    27             (Base Construction Allocation -
    28             $515,000)
    29             (Land Allocation - $10,000)
    30             (Design and Contingencies - $140,000)
    19990S0504B1471                 - 475 -

     1         (9)  Jackson Township, T-486, Bridge over
     2             Trout Lake Spillway, Bridge
     3             Replacement                                   184,000
     4             (Base Construction Allocation -
     5             $160,000)
     6             (Land Allocation - $8,000)
     7             (Design and Contingencies - $16,000)
     8         (10)  Hamilton Township, T-231, County
     9             Bridge No.8 over Appenzell Creek,
    10             Bridge Replacement                            565,000
    11             (Base Construction Allocation -
    12             $415,000)
    13             (Land Allocation - $10,000)
    14             (Design and Contingencies - $140,000)
    15         (11)  Coolbaugh Township, T-591, Steamtown
    16             Railroad Bridge, Bridge Replacement         1,031,000
    17             (Base Construction Allocation -
    18             $937,000)
    19             (Design and Contingencies - $94,000)
    20         (12)  Jackson Township, T-434, County
    21             Bridge No.13 over Appenzell Creek,
    22             Bridge Replacement                            667,000
    23             (Base Construction Allocation -
    24             $525,000)
    25             (Land Allocation - $12,000)
    26             (Design and Contingencies - $130,000)
    27         (13)  Hamilton Township, T-237, County
    28             Bridge No.12 over Lake Creek, Bridge
    29             Replacement                                   430,000
    30             (Base Construction Allocation -
    19990S0504B1471                 - 476 -

     1             $300,000)
     2             (Land Allocation - $10,000)
     3             (Design and Contingencies - $120,000)
     4     (b)  State Bridges
     5         (1)  SR 0447, SR 0447 over Broadhead Creek
     6             and Railroad, Stroud Township, Bridge
     7             Rehabilitation                              1,395,000
     8             (Base Construction Allocation -
     9             $1,071,000)
    10             (Design and Contingencies - $324,000)
    11         (2)  SR 3003, Silver Spring Boulevard over
    12             Chapple Creek, Eldred Township, Bridge
    13             Replacement                                   280,000
    14             (Base Construction Allocation -
    15             $130,000)
    16             (Land Allocation - $50,000)
    17             (Design and Contingencies - $100,000)
    18         (3)  SR 2012, SR 2012 over Broadhead Creek,
    19             East Stroudsburg Borough, Bridge
    20             Rehabilitation                              1,500,000
    21             (Base Construction Allocation -
    22             $1,150,000)
    23             (Design and Contingencies - $350,000)
    24         (4)  SR 0080, I-80 Westbound over
    25             Tunkhannock Creek at County Line,
    26             Tobyhanna Township, Bridge
    27             Rehabilitation                                935,000
    28             (Base Construction Allocation -
    29             $720,000)
    30             (Design and Contingencies - $215,000)
    19990S0504B1471                 - 477 -

     1         (5)  SR 0080, I-80 Eastbound over
     2             Tunkhannock Creek at County Line,
     3             Tunkhannock Township, Bridge
     4             Rehabilitation                                935,000
     5             (Base Construction Allocation -
     6             $720,000)
     7             (Design and Contingencies - $215,000)
     8         (6)  SR 4003, SR 4003 over Lehigh River at
     9             Lackawanna County Line, Coolbaugh
    10             Township, Bridge Rehabilitation               390,000
    11             (Base Construction Allocation -
    12             $295,000)
    13             (Design and Contingencies - $95,000)
    14         (7)  SR 0033, Northbound Bridge over US 209
    15             Westbound, Hamilton Township, Bridge
    16             Rehabilitation                                180,000
    17             (Base Construction Allocation -
    18             $180,000)
    19         (8)  SR 0191, Stites Bridge, Stroudsburg
    20             Township, Bridge Rehabilitation               600,000
    21             (Base Construction Allocation -
    22             $500,000)
    23             (Design and Contingencies - $100,000)
    24         (9)  SR 0209, Bridge over I-80, Smithfield
    25             Township, Bridge Rehabilitation               434,000
    26             (Base Construction Allocation -
    27             $334,000)
    28             (Design and Contingencies - $100,000)
    29         (10)  SR 0402, Ressica Falls Bridge over
    30             Big Bushkill Creek, Middle Smithfield
    19990S0504B1471                 - 478 -

     1             Township, Bridge Replacement                1,520,000
     2             (Base Construction Allocation -
     3             $1,060,000)
     4             (Land Allocation - $60,000)
     5             (Design and Contingencies - $400,000)
     6         (11)  SR 0423, Warnertown Bridge over
     7             Tobyhanna Creek, Coolbaugh Township,
     8             Bridge Rehabilitation                         977,000
     9             (Base Construction Allocation -
    10             $600,000)
    11             (Land Allocation - $27,000)
    12             (Design and Contingencies - $350,000)
    13         (12)  SR 0940, Pocono Summit Bridge over
    14             Conrail, Tobyhanna Township, Bridge
    15             Rehabilitation                              1,250,000
    16             (Base Construction Allocation -
    17             $1,000,000)
    18             (Land Allocation - $50,000)
    19             (Design and Contingencies - $200,000)
    20         (13)  SR 1010, Bridge over Stony Creek,
    21             Price Township, Bridge Replacement            310,000
    22             (Base Construction Allocation -
    23             $200,000)
    24             (Land Allocation - $10,000)
    25             (Design and Contingencies - $100,000)
    26         (14)  SR 2003, Bridge over Cherry Creek,
    27             Hamilton Township, Bridge Replacement         205,000
    28             (Base Construction Allocation -
    29             $139,000)
    30             (Land Allocation - $13,000)
    19990S0504B1471                 - 479 -

     1             (Design and Contingencies - $53,000)
     2         (15)  SR 2004, Saylorsburg Bridge over SR
     3             0033, Hamilton Township, Bridge
     4             Rehabilitation                                335,000
     5             (Base Construction Allocation -
     6             $304,000)
     7             (Design and Contingencies - $31,000)
     8         (16)  SR 2017, Bridge over I-80 at Exit 51,
     9             East Stroudsburg Borough, Bridge
    10             Rehabilitation                                689,000
    11             (Base Construction Allocation -
    12             $625,000)
    13             (Design and Contingencies - $64,000)
    14         (17)  SR 2030, Water Gap Bridge over US
    15             209, Smithfield Township, Bridge
    16             Rehabilitation                              1,390,000
    17             (Base Construction Allocation -
    18             $1,158,000)
    19             (Design and Contingencies - $232,000)
    20         (18)  SR 3011, Bridge over Sugar Hollow
    21             Creek, Chestnuthill Township, Bridge
    22             Replacement                                   129,000
    23             (Base Construction Allocation -
    24             $117,000)
    25             (Design and Contingencies - $12,000)
    26         (19)  SR 3016, Bridge over Pohopoco Creek,
    27             Chestnuthill Township, Bridge
    28             Replacement                                   139,000
    29             (Base Construction Allocation -
    30             $121,000)
    19990S0504B1471                 - 480 -

     1             (Land Allocation - $6,000)
     2             (Design and Contingencies - $12,000)
     3         (20)  SR 3018, Bridge No.1 over Kettle
     4             Creek, Hamilton Township, Bridge
     5             Replacement                                    80,000
     6             (Base Construction Allocation -
     7             $70,000)
     8             (Land Allocation - $3,000)
     9             (Design and Contingencies - $7,000)
    10         (21)  SR 3018, Bridge No.2 over Kettle
    11             Creek, Hamilton Township, Bridge
    12             Replacement                                    68,000
    13             (Base Construction Allocation -
    14             $59,000)
    15             (Land Allocation - $3,000)
    16             (Design and Contingencies - $6,000)
    17         (22)  SR 3022, Bridge over McMichael Creek,
    18             Hamilton Township, Bridge Replacement         161,000
    19             (Base Construction Allocation -
    20             $140,000)
    21             (Land Allocation - $7,000)
    22             (Design and Contingencies - $14,000)
    23         (23)  SR 4001, Long Pond Bridge over
    24             Tunkhannock Creek, Tunkhannock
    25             Township, Bridge Replacement                1,454,000
    26             (Base Construction Allocation -
    27             $900,000)
    28             (Land Allocation - $50,000)
    29             (Design and Contingencies - $500,000)
    30         (24)  SR 4007, Pocono Manor Bridge over E L
    19990S0504B1471                 - 481 -

     1             Railroad, Borough of Mt. Pocono, Bridge
     2             Replacement                                 1,185,000
     3             (Base Construction Allocation -
     4             $935,000)
     5             (Land Allocation - $50,000)
     6             (Design and Contingencies - $200,000)
     7         (25)  SR 0080, Five Bridges over I-80
     8             including SRs 0191, 0209, 2017, 2030
     9             and 8026, Bridge Deck Rehabilitation        5,250,000
    10             (Base Construction Allocation -
    11             $3,500,000)
    12             (Design and Contingencies - $1,750,000)
    13         (26)  SR 2017, Bridge over I-80, East
    14             Stroudsburg Borough, Bridge Deck
    15             Rehabilitation                              1,500,000
    16             (Base Construction Allocation -
    17             $1,500,000)
    18  Section 50.  Montgomery County.
    19     (a)  Local Bridges
    20         (1)  Norristown Borough, Hospital Bridge
    21             over Stony Creek, Bridge Replacement          412,000
    22             (Base Construction Allocation -
    23             $365,000)
    24             (Land Allocation - $10,000)
    25             (Design and Contingencies - $37,000)
    26         (2)  Trappe Borough, College Avenue Bridge
    27             over Tributary of Perkiomen Creek,
    28             Bridge Replacement                            360,000
    29             (Base Construction Allocation -
    30             $300,000)
    19990S0504B1471                 - 482 -

     1             (Land Allocation - $10,000)
     2             (Design and Contingencies - $50,000)
     3         (3)  Towamencin Township, Bustard Road
     4             Bridge over Towamencin Creek, Bridge
     5             Replacement                                   454,000
     6             (Base Construction Allocation -
     7             $400,000)
     8             (Land Allocation - $10,000)
     9             (Design and Contingencies - $44,000)
    10         (4)  Upper Hanover Township, T-444,
    11             Treichler Road Bridge under Reading
    12             Railroad, Bridge Removal                      151,000
    13             (Base Construction Allocation -
    14             $126,000)
    15             (Land Allocation - $5,000)
    16             (Design and Contingencies - $20,000)
    17         (5)  Upper Providence Township, T-400,
    18             Supio Road Bridge under Reading
    19             Railroad, Bridge Removal                      187,000
    20             (Base Construction Allocation -
    21             $157,000)
    22             (Land Allocation - $5,000)
    23             (Design and Contingencies - $25,000)
    24         (6)  Upper Salford Township, T-444, Bridge
    25             over Abandoned Railroad, Bridge
    26             Removal                                     1,175,000
    27             (Base Construction Allocation -
    28             $1,000,000)
    29             (Land Allocation - $25,000)
    30             (Design and Contingencies - $150,000)
    19990S0504B1471                 - 483 -

     1         (7)  Norristown Borough, Markley Street
     2             Bridge over Stoney Creek, Bridge
     3             Replacement                                 1,250,000
     4             (Base Construction Allocation -
     5             $1,000,000)
     6             (Land Allocation - $50,000)
     7             (Design and Contingencies - $200,000)
     8         (8)  Norristown Borough, Markley Street
     9             Bridge over Stoney Creek, Bridge
    10             Rehabilitation                                500,000
    11             (Base Construction Allocation -
    12             $400,000)
    13             (Land Allocation - $10,000)
    14             (Design and Contingencies - $90,000)
    15         (9)  Horsham Township, Davis Grove Road
    16             over Park Creek, Bridge Replacement           300,000
    17             (Base Construction Allocation -
    18             $230,000)
    19             (Land Allocation - $20,000)
    20             (Design and Contingencies - $50,000)
    21         (10)  Franconia Township, Keller Creamery
    22             Road over Indian Creek, Bridge
    23             Replacement                                   320,000
    24             (Base Construction Allocation -
    25             $250,000)
    26             (Land Allocation - $20,000)
    27             (Design and Contingencies - $50,000)
    28         (11)  East Norriton Township, Germantown
    29             Pike over Five Mile Run Creek, Bridge
    30             Replacement                                   500,000
    19990S0504B1471                 - 484 -

     1             (Base Construction Allocation -
     2             $430,000)
     3             (Land Allocation - $20,000)
     4             (Design and Contingencies - $50,000)
     5         (12)  Upper Hanover Township, Eleventh
     6             Street over Macoby Creek, Bridge
     7             Replacement                                   400,000
     8             (Base Construction Allocation -
     9             $340,000)
    10             (Land Allocation - $20,000)
    11             (Design and Contingencies - $40,000)
    12         (13)  Lower Merion Township, Black Rock
    13             Road over Mill Creek, Bridge
    14             Replacement                                   350,000
    15             (Base Construction Allocation -
    16             $295,000)
    17             (Land Allocation - $20,000)
    18             (Design and Contingencies - $35,000)
    19         (14)  Lower Merion Township, Morris Road
    20             over Mill Creek, Bridge Replacement           350,000
    21             (Base Construction Allocation -
    22             $285,000)
    23             (Land Allocation - $20,000)
    24             (Design and Contingencies - $45,000)
    25         (15)  Upper Merion Township, Conrail over
    26             South Gulph Road, Bridge Replacement        4,500,000
    27             (Base Construction Allocation -
    28             $4,250,000)
    29             (Land Allocation - $50,000)
    30             (Design and Contingencies - $200,000)
    19990S0504B1471                 - 485 -

     1         (16)  Trappe Borough, College Avenue over
     2             Buckwalter Tributary, Bridge
     3             Replacement                                   140,000
     4             (Base Construction Allocation -
     5             $120,000)
     6             (Design and Contingencies - $20,000)
     7         (17)  Upper Hanover Township, Knights Road
     8             Bridge No.237 over Green Lane
     9             Reservoir, Bridge Rehabilitation            1,450,000
    10             (Base Construction Allocation -
    11             $1,200,000)
    12             (Design and Contingencies - $250,000)
    13         (18)  PLYMOUTH TOWNSHIP, RIDGE PIKE BRIDGE                 <--
    14             OVER CONRAIL, BRIDGE REPLACEMENT            2,400,000
    15             (BASE CONSTRUCTION ALLOCATION -
    16             $2,000,000)
    17             (LAND ALLOCATION - $100,000)
    18             (DESIGN AND CONTINGENCIES - $300,000)
    19     (b)  State Bridges
    20         (1)  SR 2009, Byberry Road Bridge over
    21             Southampton Creek, Upper Moreland
    22             Township and Bryn Athyn Borough,
    23             Historic Bridge Replacement                   680,000
    24             (Base Construction Allocation -
    25             $500,000)
    26             (Land Allocation - $20,000)
    27             (Design and Contingencies - $160,000)
    28         (2)  SR 2018, Bethlehem Pike Bridge over
    29             Branch of Wissahickon Creek,
    30             Springfield Township, Bridge
    19990S0504B1471                 - 486 -

     1             Rehabilitation                                525,000
     2             (Base Construction Allocation -
     3             $400,000)
     4             (Land Allocation - $25,000)
     5             (Design and Contingencies - $100,000)
     6         (3)  SR 4030, New Hanover Square Road
     7             Bridge over West Swamp Creek (Two
     8             Bridges), New Hanover Township, Bridge
     9             Replacement                                 1,150,000
    10             (Base Construction Allocation -
    11             $900,000)
    12             (Land Allocation - $50,000)
    13             (Design and Contingencies - $200,000)
    14         (4)  SR 0100, Extended, (Three Bridges),
    15             High Street to Farmington Road,
    16             Pottstown Borough and Upper Pottsgrove
    17             Township, Bridge Rehabilitation             1,650,000
    18             (Base Construction Allocation -
    19             $1,500,000)
    20             (Land Allocation - $50,000)
    21             (Design and Contingencies - $100,000)
    22         (5)  SR 1017, Salfordville Road Bridge over
    23             East Branch of Perkiomen Creek, Lower
    24             Salford Township, Bridge Replacement        1,500,000
    25             (Base Construction Allocation -
    26             $1,250,000)
    27             (Land Allocation - $50,000)
    28             (Design and Contingencies - $200,000)
    29         (6)  SR 1024, Salford Station (Two Bridges)
    30             over Perkiomen Creek, Upper Salford and
    19990S0504B1471                 - 487 -

     1             Lower Fredrick Townships, Bridge
     2             Replacement                                 1,200,000
     3             (Base Construction Allocation -
     4             $1,000,000)
     5             (Land Allocation - $50,000)
     6             (Design and Contingencies - $150,000)
     7         (7)  SR 3020, Dannehower Bridge over River
     8             and New US 202, Upper Merion Township,
     9             Bridgeport and Norristown Boroughs,
    10             Bridge Painting                               872,000
    11             (Base Construction Allocation -
    12             $802,000)
    13             (Design and Contingencies - $70,000)
    14         (8)  SR 3039, South Gulph Road Overpass
    15             under Conrail, Upper Merion Township,
    16             Bridge Replacement                          1,500,000
    17             (Base Construction Allocation -
    18             $1,300,000)
    19             (Land Allocation - $50,000)
    20             (Design and Contingencies - $150,000)
    21         (9)  SR 4003, Black Rock Road Bridge over
    22             Abandoned Reading Track, Upper
    23             Providence Township, Bridge Removal           205,000
    24             (Base Construction Allocation -
    25             $175,000)
    26             (Land Allocation - $10,000)
    27             (Design and Contingencies - $20,000)
    28         (10)  SR 4012, Graterford Road Bridge over
    29             Perkiomen Creek, Skippack and Perkiomen
    30             Townships, Bridge Replacement               1,475,000
    19990S0504B1471                 - 488 -

     1             (Base Construction Allocation -
     2             $1,300,000)
     3             (Land Allocation - $50,000)
     4             (Design and Contingencies - $125,000)
     5         (11)  SR 4031, Ridge Pike Bridge over
     6             Manatawny Creek, Pottstown Borough,
     7             Bridge Replacement                          2,053,000
     8             (Base Construction Allocation -
     9             $1,935,000)
    10             (Land Allocation - $45,000)
    11             (Design and Contingencies - $73,000)
    12         (12)  SR 0463, Horsham Road Bridge over
    13             Upper State Road, Montgomery Township,
    14             Bridge Replacement                          1,100,000
    15             (Base Construction Allocation -
    16             $950,000)
    17             (Land Allocation - $150,000)
    18         (13)  SR 0422, Pottstown Expressway Bridge
    19             over Schuylkill River, Lower Pottsgrove
    20             Township, Bridge Deck Rehabilitation          310,000
    21             (Base Construction Allocation -
    22             $240,000)
    23             (Land Allocation - $10,000)
    24             (Design and Contingencies - $60,000)
    25         (14)  SR 3020, Dannehower Bridge over
    26             Schuylkill River, Parkway and Railroad,
    27             Upper Merion Township, Bridge Deck
    28             Rehabilitation                              1,420,000
    29             (Base Construction Allocation -
    30             $1,165,000)
    19990S0504B1471                 - 489 -

     1             (Land Allocation - $40,000)
     2             (Design and Contingencies - $215,000)
     3         (15)  SR 0152, SUSQUEHANNA AND LIMEKILN                    <--
     4             PIKE BRIDGE OVER CONRAIL AND NORFOLK
     5             SOUTHERN RAILROAD, UPPER DUBLIN
     6             TOWNSHIP, BRIDGE REPLACEMENT                7,000,000
     7  Section 51.  Montour County.
     8     (a)  Local Bridges
     9         (1)  Derry Township, T-407, County Bridge
    10             No.13 over West Branch of Chillisquaque
    11             Creek near Washingtonville Borough,
    12             Bridge Replacement                            350,000
    13             (Base Construction Allocation -
    14             $265,000)
    15             (Land Allocation - $35,000)
    16             (Design and Contingencies - $50,000)
    17         (2)  Liberty Township, T-324, Bridge over
    18             Chillisquaque Creek, Bridge
    19             Replacement                                   824,000
    20             (Base Construction Allocation -
    21             $634,000)
    22             (Design and Contingencies - $190,000)
    23         (3)  Limestone Township, T-417, Bridge over
    24             Chillisquaque Creek, Bridge
    25             Replacement                                   559,000
    26             (Base Construction Allocation -
    27             $399,000)
    28             (Design and Contingencies - $160,000)
    29     (b)  State Bridges
    30         (1)  SR 1004, Bridge over Chillisquaque
    19990S0504B1471                 - 490 -

     1             Creek, North of Washingtonville
     2             Borough, Bridge Replacement                   620,000
     3             (Base Construction Allocation -
     4             $500,000)
     5             (Land Allocation - $40,000)
     6             (Design and Contingencies - $80,000)
     7         (2)  SR 1006, Bridge over Branch of
     8             Chillisquaque Creek, 3 Miles Northwest
     9             of Washingtonville Borough, Bridge
    10             Replacement                                   510,000
    11             (Base Construction Allocation -
    12             $410,000)
    13             (Land Allocation - $25,000)
    14             (Design and Contingencies - $80,000)
    15         (3)  SR 3004, Bridge over Beaver Run, 2
    16             Miles West of Moresburg, Bridge
    17             Replacement                                   285,000
    18             (Base Construction Allocation -
    19             $227,000)
    20             (Land Allocation - $14,000)
    21             (Design and Contingencies - $44,000)
    22         (4)  SR 4001, Bridge over Chillisquaque
    23             Creek, Anthony Township, Bridge
    24             Replacement                                   458,000
    25             (Base Construction Allocation -
    26             $366,000)
    27             (Land Allocation - $23,000)
    28             (Design and Contingencies - $69,000)
    29         (5)  SR 0011, SR 0011 over Sechler Run,
    30             Mahoning Township, Bridge Replacement         582,000
    19990S0504B1471                 - 491 -

     1             (Base Construction Allocation -
     2             $466,000)
     3             (Land Allocation - $29,000)
     4             (Design and Contingencies - $87,000)
     5         (6)  SR 0054, SR 0054 over Chillisquaque
     6             Creek, Anthony Township, Bridge
     7             Replacement                                   547,000
     8             (Base Construction Allocation -
     9             $438,000)
    10             (Land Allocation - $27,000)
    11             (Design and Contingencies - $82,000)
    12         (7)  SR 0642, SR 0642 over Mahoning Creek,
    13             West Hemlock Township, Bridge
    14             Replacement                                   213,000
    15             (Base Construction Allocation -
    16             $170,000)
    17             (Land Allocation - $11,000)
    18             (Design and Contingencies - $32,000)
    19         (8)  SR 1009, SR 1009 over Branch of Lowry
    20             Run, Anthony Township, Bridge
    21             Replacement                                   431,000
    22             (Base Construction Allocation -
    23             $345,000)
    24             (Land Allocation - $21,000)
    25             (Design and Contingencies - $65,000)
    26         (9)  SR 1011, SR 1011 over Tributary of
    27             Chillisquaque Creek, Anthony Township,
    28             Bridge Replacement                            212,000
    29             (Base Construction Allocation -
    30             $170,000)
    19990S0504B1471                 - 492 -

     1             (Land Allocation - $11,000)
     2             (Design and Contingencies - $31,000)
     3  Section 52.  Northampton County.
     4     (a)  Local Bridges
     5         (1)  Lehigh Township, Indiantrail Road
     6             Bridge over Indian Creek, Bridge
     7             Painting                                       16,000
     8             (Base Construction Allocation -
     9             $14,000)
    10             (Design and Contingencies - $2,000)
    11         (2)  Lehigh Township, T-548, Bridge over
    12             Bertsch Creek, Bridge Replacement             400,000
    13             (Base Construction Allocation -
    14             $300,000)
    15             (Land Allocation - $20,000)
    16             (Design and Contingencies - $80,000)
    17         (3)  Lehigh Township, Wood Drive Bridge,
    18             Bridge Replacement                             65,000
    19             (Base Construction Allocation -
    20             $41,000)
    21             (Land Allocation - $4,000)
    22             (Design and Contingencies - $20,000)
    23         (4)  Freemansburg Borough, LVRR Bridge over
    24             Main Street, Bridge Removal                   898,000
    25             (Base Construction Allocation -
    26             $694,000)
    27             (Land Allocation - $100,000)
    28             (Design and Contingencies - $104,000)
    29         (5)  City of Bethlehem, County Bridge
    30             No.88, Bridge over Monocacy Creek,
    19990S0504B1471                 - 493 -

     1             Bridge Rehabilitation                         275,000
     2             (Base Construction Allocation -
     3             $250,000)
     4             (Design and Contingencies - $25,000)
     5         (6)  City of Easton, Bushkill Street Bridge
     6             over Bushkill Creek, Bridge
     7             Rehabilitation                                102,000
     8         (7)  City of Easton, Railroad Bridge over
     9             SR 2005, Bridge Rehabilitation              5,000,000
    10         (8)  City of Easton, Old Glendon Bridge
    11             over Lehigh River, Bridge
    12             Rehabilitation                              1,381,000
    13         (9)  City of Easton, Railroad Bridge over
    14             SR 2005, Bridge Rehabilitation              5,000,000
    15         (10)  Lower Mount Bethel Township, T-692,
    16             Bridge over Oughoughton Creek, Bridge
    17             Replacement                                   440,000
    18         (11)  Lower Saucon Township, T-371, Bridge
    19             over Saucon Creek, Bridge
    20             Rehabilitation                                100,000
    21         (12)  Plainfield Township, T-629, Bridge
    22             over Wind Gap Creek, Bridge
    23             Replacement                                   210,000
    24         (13)  Stockertown Borough, Lefevre Road
    25             Bridge over Little Bushkill Creek,
    26             Bridge Replacement                            380,000
    27         (14)  Upper Nazareth Township, T-511,
    28             Bridge over East Branch of Monocacy
    29             Creek, Bridge Replacement                     186,000
    30         (15)  CHAPMAN'S BOROUGH, MONOCACY AVENUE,                  <--
    19990S0504B1471                 - 494 -

     1             CULVERT REPLACEMENT                           207,000
     2             (BASE CONSTRUCTION ALLOCATION -
     3             $172,000)
     4             (LAND ALLOCATION - $5,000)
     5             (DESIGN AND CONTINGENCIES - $30,000)
     6     (b)  State Bridges
     7         (1)  SR 2017, Tatamy Road over Tributary of
     8             Bushkill Creek, Palmer Township, Bridge
     9             Rehabilitation                                240,000
    10             (Base Construction Allocation -
    11             $100,000)
    12             (Land Allocation - $40,000)
    13             (Design and Contingencies - $100,000)
    14         (2)  SR 4020, Maple Drive over Tributary of
    15             Bertsch Creek, Lehigh Township, Bridge
    16             Rehabilitation                                465,000
    17             (Base Construction Allocation -
    18             $275,000)
    19             (Land Allocation - $80,000)
    20             (Design and Contingencies - $110,000)
    21         (3)  SR 0611, Railroad Bridge over SR 0611,
    22             Borough of Portland, Bridge
    23             Reconstruction                              2,500,000
    24             (Base Construction Allocation -
    25             $1,800,000)
    26             (Land Allocation - $170,000)
    27             (Design and Contingencies - $530,000)
    28         (4)  SR 0033, Bridges over Van Buren Road
    29             and SR 1002, Palmer Township, Bridge
    30             Deck Rehabilitation                         3,000,000
    19990S0504B1471                 - 495 -

     1             (Base Construction Allocation -
     2             $3,000,000)
     3         (5)  SR 0378, Overhead Bridges on Broad,
     4             14th and Eaton Avenue, City of
     5             Bethlehem, Bridge Rehabilitation            1,500,000
     6             (Base Construction Allocation -
     7             $1,500,000)
     8         (6)  SR 0611, Sandts Eddy Arch Bridge over
     9             Mud Run, Lower Mt. Bethel Township,
    10             Bridge Replacement                            800,000
    11             (Base Construction Allocation -
    12             $700,000)
    13             (Land Allocation - $20,000)
    14             (Design and Contingencies - $80,000)
    15         (7)  SR 0611, SANDTS EDDY ARCH BRIDGE OVER                 <--
    16             MUD RUN, LOWER MOUNT BETHEL TOWNSHIP,
    17             BRIDGE REPLACEMENT                          1,325,000
    18             (BASE CONSTRUCTION ALLOCATION -
    19             $1,000,000)
    20             (LAND ALLOCATION - $50,000)
    21             (DESIGN AND CONTINGENCIES - $275,000)
    22  Section 53.  Northumberland County.
    23     (a)  Local Bridges
    24         (1)  Borough of Milton, Ridge Avenue over
    25             Limestone Run, Bridge Replacement             520,000
    26             (Base Construction Allocation -
    27             $380,000)
    28             (Land Allocation - $20,000)
    29             (Design and Contingencies - $120,000)
    30         (2)  Lewis Township, T-631, Old State Road
    19990S0504B1471                 - 496 -

     1             Bridge over Branch of Beaver Run,
     2             Bridge Replacement                            220,000
     3             (Base Construction Allocation -
     4             $200,000)
     5             (Design and Contingencies - $20,000)
     6         (3)  Ralpho Township, County Bridge No.183,
     7             Bridge Replacement                            190,000
     8     (b)  State Bridges
     9         (1)  SR 0642, Chillisquaque Creek Bridge
    10             over Chillisquaque Creek, 0.5 Mile East
    11             of Pottsgrove, Bridge Deck Replacement      1,184,000  <--
    12             (Base Construction Allocation -
    13             $947,000)
    14             (Land Allocation - $59,000)
    15             (Design and Contingencies - $178,000)
    16             OF POTTSGROVE, BRIDGE DECK REPLACEMENT      1,190,000  <--
    17             (BASE CONSTRUCTION ALLOCATION -
    18             $950,000)
    19             (LAND ALLOCATION - $60,000)
    20             (DESIGN AND CONTINGENCIES - $180,000)
    21         (2)  SR 1005, Delaware Run Bridge over
    22             Delaware Run, 3 Miles North of
    23             Watsontown Borough, Bridge Replacement        509,000
    24             (Base Construction Allocation -
    25             $408,000)
    26             (Land Allocation - $25,000)
    27             (Design and Contingencies - $76,000)
    28         (3)  SR 0045, Bridge over Chillisquaque
    29             Creek, East of SR 0147, Bridge
    30             Painting                                      260,000
    19990S0504B1471                 - 497 -

     1             (Base Construction Allocation -
     2             $250,000)
     3             (Design and Contingencies - $10,000)
     4         (4)  SR 0054, SR 0054 over North Branch of
     5             Shamokin Creek, Mt. Carmel Township,
     6             Bridge Replacement                            721,000  <--
     7             (Base Construction Allocation -
     8             $577,000)
     9             (Land Allocation - $36,000)
    10             (Design and Contingencies - $108,000)
    11             BRIDGE REPLACEMENT                            750,000  <--
    12             (BASE CONSTRUCTION ALLOCATION -
    13             $600,000)
    14             (LAND ALLOCATION - $35,000)
    15             (DESIGN AND CONTINGENCIES - $120,000)
    16         (5)  SR 2001, SR 2001 over Little Roaring
    17             Creek, Rush Township, Bridge
    18             Replacement                                   415,000
    19             (Base Construction Allocation -
    20             $335,000)
    21             (Land Allocation - $20,000)
    22             (Design and Contingencies - $60,000)
    23         (6)  SR 2023, SR 2023 over Conrail, Mt.
    24             Carmel Township, Bridge Replacement         1,275,000
    25             (Base Construction Allocation -                        <--
    26             $1,020,000)
    27             (Land Allocation - $64,000)
    28             (Design and Contingencies - $191,000)
    29             (BASE CONSTRUCTION ALLOCATION -                        <--
    30             $1,025,000)
    19990S0504B1471                 - 498 -

     1             (LAND ALLOCATION - $50,000)
     2             (DESIGN AND CONTINGENCIES - $200,000)
     3         (7)  SR 4013, SR 4013 over Plum Creek,
     4             Rockefeller Township, Bridge
     5             Replacement                                   361,000
     6             (Base Construction Allocation -
     7             $289,000)
     8             (Land Allocation - $18,000)
     9             (Design and Contingencies - $54,000)
    10         (8)  SR 0011, Railroad Overpass Bridge over
    11             Water Street, Northumberland Borough,
    12             Bridge Rehabilitation                       3,500,000
    13             (Base Construction Allocation -
    14             $3,200,000)
    15             (Land Allocation - $100,000)
    16             (Design and Contingencies - $200,000)
    17         (9)  SR 1025, Chillisquaque Creek Bridge
    18             over Chillisquaque Creek, East
    19             Chillisquaque Township, Bridge
    20             Painting                                      135,000
    21             (Base Construction Allocation -
    22             $125,000)
    23             (Design and Contingencies - $10,000)
    24         (10)  SR 3006, Mahanoy Creek Bridge over
    25             Mahanoy Creek, Jackson Township, Bridge
    26             Painting                                      360,000
    27             (Base Construction Allocation -
    28             $350,000)
    29             (Design and Contingencies - $10,000)
    30         (11)  SR 0180, I-180 Bridge, 6 Structures,
    19990S0504B1471                 - 499 -

     1             Lycoming County to Delaware Township,
     2             Bridge Rehabilitation                       2,450,000
     3             (Base Construction Allocation -
     4             $2,300,000)
     5             (Design and Contingencies - $150,000)
     6         (12)  SR 2015, Hospital Road Bridge over
     7             Shamokin Creek, Coal Township, Bridge
     8             Replacement                                   200,000
     9             (Base Construction Allocation -
    10             $170,000)
    11             (Design and Contingencies - $30,000)
    12         (13)  SR 0011, BRIDGE OVER TRIBUTARY OF                    <--
    13             SUSQUEHANNA RIVER, POINT TOWNSHIP,
    14             BRIDGE REPLACEMENT                            700,000
    15             (BASE CONSTRUCTION ALLOCATION -
    16             $400,000)
    17             (LAND ALLOCATION - $100,000)
    18             (DESIGN AND CONTINGENCIES - $200,000)
    19         (14)  SR 0044, BRIDGE OVER BEAVER RUN,
    20             LEWIS TOWNSHIP, BRIDGE REPLACEMENT            390,000
    21             (BASE CONSTRUCTION ALLOCATION -
    22             $240,000)
    23             (LAND ALLOCATION - $30,000)
    24             (DESIGN AND CONTINGENCIES - $120,000)
    25         (15)  SR 0054, BRIDGE OVER DELAWARE RUN,
    26             DELAWARE TOWNSHIP, BRIDGE REPLACEMENT         680,000
    27             (BASE CONSTRUCTION ALLOCATION -
    28             $450,000)
    29             (LAND ALLOCATION - $30,000)
    30             (DESIGN AND CONTINGENCIES - $200,000)
    19990S0504B1471                 - 500 -

     1         (16)  SR 0054, BRIDGE OVER DEIBLER CREEK,
     2             RALPHO TOWNSHIP, BRIDGE REPLACEMENT           580,000
     3             (BASE CONSTRUCTION ALLOCATION -
     4             $350,000)
     5             (LAND ALLOCATION - $30,000)
     6             (DESIGN AND CONTINGENCIES - $200,000)
     7         (17)  SR 0225, BRIDGE OVER TRIBUTARY OF
     8             MAHANTANGO CREEK, LOWER MAHANOY
     9             TOWNSHIP, BRIDGE REPLACEMENT                  420,000
    10             (BASE CONSTRUCTION ALLOCATION -
    11             $270,000)
    12             (LAND ALLOCATION - $30,000)
    13             (DESIGN AND CONTINGENCIES - $120,000)
    14         (18)  SR 1014, BRIDGE OVER WEST BRANCH OF
    15             SUSQUEHANNA RIVER, WATSONTOWN BOROUGH,
    16             BRIDGE REHABILITATION                       6,950,000
    17             (BASE CONSTRUCTION ALLOCATION -
    18             $5,900,000)
    19             (LAND ALLOCATION - $250,000)
    20             (DESIGN AND CONTINGENCIES - $800,000)
    21         (19)  SR 2015, BRIDGE OVER SHAMOKIN CREEK
    22             AND RAILROAD, COAL TOWNSHIP, BRIDGE
    23             REHABILITATION                              1,000,000
    24             (BASE CONSTRUCTION ALLOCATION -
    25             $850,000)
    26             (DESIGN AND CONTINGENCIES - $150,000)
    27         (20)  SR 2027, BRIDGE OVER TRIBUTARY OF
    28             SCHWABEN CREEK, UPPER MAHANOY TOWNSHIP,
    29             BRIDGE REPLACEMENT                            530,000
    30             (BASE CONSTRUCTION ALLOCATION -
    19990S0504B1471                 - 501 -

     1             $300,000)
     2             (LAND ALLOCATION - $30,000)
     3             (DESIGN AND CONTINGENCIES - $200,000)
     4  Section 54.  Perry County.
     5     (a)  Local Bridges
     6         (1)  Tyrone Township, County Bridge No.4,
     7             Rices Bridge over Shermans Creek,
     8             Covered Bridge Replacement                    768,000
     9             (Base Construction Allocation -
    10             $552,000)
    11             (Land Allocation - $77,000)
    12             (Design and Contingencies - $139,000)
    13         (2)  Northeast Madison Township, T-403 over
    14             Bixler Run, Bridge Replacement                585,000
    15             (Base Construction Allocation -
    16             $400,000)
    17             (Land Allocation - $10,000)
    18             (Design and Contingencies - $175,000)
    19         (3)  Tyrone Township, Rices Bridge (County
    20             Bridge No.4) over Shermans Creek,
    21             Bridge Replacement                            768,000
    22             (Base Construction Allocation -
    23             $552,000)
    24             (Land Allocation - $77,000)
    25             (Design and Contingencies - $139,000)
    26         (4)  Jackson Township, T-312, Bridge over
    27             Shermans Creek, Bridge Replacement          1,000,000
    28         (5)  Marysville Borough, South Main Street
    29             Bridge over Fishing Creek, Bridge
    30             Replacement                                   600,000
    19990S0504B1471                 - 502 -

     1         (6)  Northeast Madison Township, T-403,
     2             Bridge over Bixler Run, Bridge
     3             Replacement                                   600,000
     4         (7)  Rye Township, T-506, Bridge over
     5             Fishing Creek, Bridge Replacement              50,000
     6             (Base Construction Allocation -
     7             $37,000)
     8             (Design and Contingencies - $13,000)
     9         (8)  Rye Township, T-305, Bridge over
    10             Fishing Creek Run, Bridge Replacement          85,000
    11             (Base Construction Allocation -
    12             $73,000)
    13             (Design and Contingencies - $12,000)
    14         (9)  Saville Township, T-324, Bridge over
    15             Big Buffalo Creek, Bridge Replacement         550,000
    16         (10)  Southwest Madison Township, T-405
    17             (SMT-3), Bridge over Laurel Run, Bridge
    18             Replacement                                   550,000
    19         (11)  Southwest Madison Township, T-405
    20             (SMT-2), Bridge over Laurel Run, Bridge
    21             Replacement                                   575,000
    22         (12)  Southwest Madison Township, T-405
    23             (SMT-1), Bridge over Laurel Run, Bridge
    24             Replacement                                   575,000
    25         (13)  Toboyne Township, T-300, Bridge over
    26             Shaeffer Run, Bridge Replacement              550,000
    27         (14)  Tyrone Township, T-381, Bridge over
    28             Montour Creek, Bridge Replacement             550,000
    29         (15)  Wheatfield Township, T-506, Bridge
    30             over Little Juniata Creek, Bridge
    19990S0504B1471                 - 503 -

     1             Replacement                                   575,000
     2         (16)  Wheatfield Township, T-466, Bridge
     3             over Little Juniata Creek, Bridge
     4             Replacement                                   550,000
     5     (b)  State Bridges
     6         (1)  SR 4006, Raccoon Creek Bridge over
     7             Raccoon Creek, Tuscarora Township,
     8             Bridge Replacement                            466,000
     9             (Base Construction Allocation -
    10             $288,000)
    11             (Land Allocation - $20,000)
    12             (Design and Contingencies - $158,000)
    13         (2)  SR 3002, Horse Valley Road Bridges
    14             (Two Bridges) over Horse Valley Run,
    15             Toboyne Township, Bridge Replacement          725,000
    16             (Base Construction Allocation -
    17             $700,000)
    18             (Land Allocation - $5,000)
    19             (Design and Contingencies - $20,000)
    20         (3)  SR 4008, Bridge over Big Buffalo
    21             Creek, Saville Township, Bridge
    22             Replacement                                   913,000
    23             (Base Construction Allocation -
    24             $676,000)
    25             (Land Allocation - $67,000)
    26             (Design and Contingencies - $170,000)
    27         (4)  PA 849, Bridge over Buffalo Creek,
    28             Tuscarora Township, Bridge Replacement      1,379,000
    29             (Base Construction Allocation -
    30             $1,022,000)
    19990S0504B1471                 - 504 -

     1             (Land Allocation - $102,000)
     2             (Design and Contingencies - $255,000)
     3         (5)  PA 849, Bridge over Buffalo Creek,
     4             Juniata Township, Bridge Replacement        1,298,000
     5             (Base Construction Allocation -
     6             $962,000)
     7             (Land Allocation - $96,000)
     8             (Design and Contingencies - $240,000)
     9         (6)  PA 849, Bridge over Buffalo Creek,
    10             Juniata Township, Bridge Replacement        1,317,000
    11             (Base Construction Allocation -
    12             $976,000)
    13             (Land Allocation - $97,000)
    14             (Design and Contingencies - $244,000)
    15         (7)  PA 849, Bridge over Buffalo Creek,
    16             Juniata Township, Bridge Replacement        1,440,000
    17             (Base Construction Allocation -
    18             $1,067,000)
    19             (Land Allocation - $106,000)
    20             (Design and Contingencies - $267,000)
    21         (8)  SR 1011, Bridge over Little Buffalo
    22             Creek, Centre Township, Bridge
    23             Replacement                                   356,000
    24             (Base Construction Allocation -
    25             $264,000)
    26             (Land Allocation - $26,000)
    27             (Design and Contingencies - $66,000)
    28         (9)  SR 1010, Bridge over Bargers Run,
    29             Liverpool Borough, Bridge Replacement         535,000
    30             (Base Construction Allocation -
    19990S0504B1471                 - 505 -

     1             $396,000)
     2             (Land Allocation - $40,000)
     3             (Design and Contingencies - $99,000)
     4         (10)  SR 2003, Bridge over Shermans Creek,
     5             Carroll Township, Bridge Replacement          308,000
     6             (Base Construction Allocation -
     7             $170,000)
     8             (Land Allocation - $10,000)
     9             (Design and Contingencies - $128,000)
    10         (11)  SR 3005, Bridge over Shermans Creek,
    11             Southwest Madison Township, Bridge
    12             Rehabilitation                                239,000
    13             (Base Construction Allocation -
    14             $99,000)
    15             (Land Allocation - $20,000)
    16             (Design and Contingencies - $120,000)
    17         (12)  Various Bridges Preventive
    18             Maintenance                                   382,000
    19  Section 55.  Philadelphia County.
    20     (a)  Local Bridges
    21         (1)  City of Philadelphia, Byberry Road
    22             Bridge over Conrail, Temporary Bridge
    23             Construction                                  511,000
    24             (Base Construction Allocation -
    25             $390,000)
    26             (Land Allocation - $51,000)
    27             (Design and Contingencies - $70,000)
    28         (2)  City of Philadelphia, Wyoming Avenue
    29             Bridge over Former Course Frankford
    30             Creek, West of Castor Avenue, Bridge
    19990S0504B1471                 - 506 -

     1             Replacement                                 1,300,000
     2             (Base Construction Allocation -
     3             $1,200,000)
     4             (Design and Contingencies - $100,000)
     5         (3)  City of Philadelphia, Chelten Avenue
     6             Bridge over SEPTA, West of Wayne
     7             Avenue, Bridge Replacement                  2,300,000
     8             (Base Construction Allocation -
     9             $2,100,000)
    10             (Design and Contingencies - $200,000)
    11         (4)  City of Philadelphia, Fisher's Lane
    12             Bridge over Tacony Creek, West of
    13             Ramona Avenue, Bridge Replacement           1,625,000
    14             (Base Construction Allocation -
    15             $1,400,000)
    16             (Design and Contingencies - $225,000)
    17         (5)  City of Philadelphia, Kingsessing
    18             Avenue Bridge over SEPTA, Bridge
    19             Replacement                                 2,550,000
    20             (Base Construction Allocation -
    21             $2,200,000)
    22             (Land Allocation - $100,000)
    23             (Design and Contingencies - $250,000)
    24         (6)  City of Philadelphia, Montgomery
    25             Bridge over Amtrak, Bridge Replacement      5,275,000
    26             (Base Construction Allocation -
    27             $4,750,000)
    28             (Land Allocation - $125,000)
    29             (Design and Contingencies - $400,000)
    30         (7)  City of Philadelphia, Thomas Avenue
    19990S0504B1471                 - 507 -

     1             Bridge over SEPTA, Bridge Replacement       3,150,000
     2             (Base Construction Allocation -
     3             $2,750,000)
     4             (Land Allocation - $100,000)
     5             (Design and Contingencies - $300,000)
     6         (8)  City of Philadelphia, Sedgley Avenue
     7             Bridge over Conrail, Bridge
     8             Replacement                                 1,000,000
     9             (Base Construction Allocation -
    10             $800,000)
    11             (Land Allocation - $100,000)
    12             (Design and Contingencies - $100,000)
    13         (9)  City of Philadelphia, Lexington Avenue
    14             Bridge over Conrail, Bridge
    15             Replacement                                   420,000
    16             (Base Construction Allocation -
    17             $360,000)
    18             (Land Allocation - $20,000)
    19             (Design and Contingencies - $40,000)
    20         (10)  City of Philadelphia, Greenland
    21             Bridge over Conrail and I-76, Bridge
    22             Replacement                                 1,350,000
    23             (Base Construction Allocation -
    24             $1,100,000)
    25             (Land Allocation - $100,000)
    26             (Design and Contingencies - $150,000)
    27         (11)  City of Philadelphia, Glenwood Drive
    28             Bridge over Conrail, Bridge
    29             Replacement                                 1,450,000
    30             (Base Construction Allocation -
    19990S0504B1471                 - 508 -

     1             $1,200,000)
     2             (Land Allocation - $100,000)
     3             (Design and Contingencies - $150,000)
     4         (12)  City of Philadelphia, Second Street
     5             Bridge over Conrail, Bridge
     6             Replacement                                   740,000
     7             (Base Construction Allocation -
     8             $650,000)
     9             (Land Allocation - $20,000)
    10             (Design and Contingencies - $70,000)
    11         (13)  City of Philadelphia, Cambria Street
    12             Bridge over Conrail, Bridge
    13             Replacement                                 2,750,000
    14             (Base Construction Allocation -
    15             $2,400,000)
    16             (Land Allocation - $100,000)
    17             (Design and Contingencies - $250,000)
    18         (14)  City of Philadelphia, 42nd Street
    19             Bridge over AMTRAK, Bridge Replacement      5,625,000
    20             (Base Construction Allocation -
    21             $3,500,000)
    22             (Design and Contingencies - $2,125,000)
    23         (15)  City of Philadelphia, Germantown
    24             Avenue Bridge over Wissahickon Creek,
    25             Bridge Replacement                          5,800,000
    26             (Base Construction Allocation -
    27             $5,000,000)
    28             (Design and Contingencies - $800,000)
    29         (16)  City of Philadelphia, Cayuga Street
    30             Bridge over Conrail, Bridge Removal         2,350,000
    19990S0504B1471                 - 509 -

     1             (Base Construction Allocation -
     2             $2,000,000)
     3             (Design and Contingencies - $350,000)
     4         (17)  City of Philadelphia, 40th Street
     5             Bridge over AMTRAK, Bridge Replacement      8,385,000
     6             (Base Construction Allocation -
     7             $5,900,000)
     8             (Design and Contingencies - $2,485,000)
     9         (18)  City of Philadelphia, Krewstown Road,
    10             Bridge over Pennypack Creek, Bridge
    11             Rehabilitation                                730,000
    12             (Base Construction Allocation -
    13             $627,000)
    14             (Land Allocation - $28,000)
    15             (Design and Contingencies - $75,000)
    16         (19)  City of Philadelphia, South Street
    17             Bridge over Schuylkill River, Bridge
    18             Replacement                                48,050,000
    19             (Base Construction Allocation -
    20             $40,000,000)
    21             (Design and Contingencies - $8,050,000)
    22         (20)  City of Philadelphia, Hunting Park
    23             Avenue Bridge over Conrail at 5th
    24             Street, Bridge Removal                      1,200,000
    25             (Base Construction Allocation -
    26             $1,000,000)
    27             (Design and Contingencies - $200,000)
    28         (21)  City of Philadelphia, Willow Grove
    29             Avenue Bridge over SEPTA, Bridge
    30             Replacement                                 2,715,000
    19990S0504B1471                 - 510 -

     1             (Base Construction Allocation -
     2             $2,100,000)
     3             (Design and Contingencies - $615,000)
     4         (22)  City of Philadelphia, Wharton Street
     5             Bridge over CSX, Bridge Replacement         3,850,000
     6             (Base Construction Allocation -
     7             $3,000,000)
     8             (Design and Contingencies - $850,000)
     9         (23)  City of Philadelphia, Rising Sun
    10             Avenue Bridge over Conrail at 2nd
    11             Street, Bridge Removal                      1,200,000
    12             (Base Construction Allocation -
    13             $1,000,000)
    14             (Design and Contingencies - $200,000)
    15         (24)  City of Philadelphia, Erie Avenue
    16             Bridge over Conrail at 4th Street,
    17             Bridge Removal                              1,200,000
    18             (Base Construction Allocation -
    19             $1,000,000)
    20             (Design and Contingencies - $200,000)
    21         (25)  City of Philadelphia, Ontario Street
    22             Bridge over Conrail, Bridge Removal         1,200,000
    23             (Base Construction Allocation -
    24             $1,000,000)
    25             (Design and Contingencies - $200,000)
    26         (26)  City of Philadelphia, 41st Street
    27             Bridge over AMTRAK, Bridge Replacement      8,575,000
    28             (Base Construction Allocation -
    29             $6,500,000)
    30             (Design and Contingencies - $2,075,000)
    19990S0504B1471                 - 511 -

     1         (27)  City of Philadelphia, Cemetery Lane
     2             Bridge over CSX, Bridge Replacement         2,600,000
     3             (Base Construction Allocation -
     4             $2,000,000)
     5             (Design and Contingencies - $600,000)
     6         (28)  City of Philadelphia, G Street Bridge
     7             over AMTRAK, Bridge Replacement             8,270,000
     8             (Base Construction Allocation -
     9             $5,800,000)
    10             (Design and Contingencies - $2,470,000)
    11         (29)  City of Philadelphia, 59th Street
    12             Bridge over AMTRAK, Bridge Replacement      8,500,000
    13             (Base Construction Allocation -
    14             $6,000,000)
    15             (Design and Contingencies - $2,500,000)
    16         (30)  City of Philadelphia, Tabor Avenue
    17             Bridge over Tacony Creek, Bridge
    18             Replacement                                   625,000
    19             (Base Construction Allocation -
    20             $500,000)
    21             (Design and Contingencies - $125,000)
    22         (31)  City of Philadelphia, 61st Street
    23             Bridge over AHSL, Bridge Replacement        3,850,000
    24             (Base Construction Allocation -
    25             $3,000,000)
    26             (Design and Contingencies - $850,000)
    27     (b)  State Bridges
    28         (1)  SR 4007, Germantown Avenue Bridge,
    29             Conrail Overpass, City of Philadelphia,
    30             Bridge Removal                                125,000
    19990S0504B1471                 - 512 -

     1             (Base Construction Allocation -
     2             $100,000)
     3             (Land Allocation - $10,000)
     4             (Design and Contingencies - $15,000)
     5         (2)  SR 0076, Schuylkill Expressway Bridge
     6             over Schuylkill River, City of
     7             Philadelphia, Bridge Painting               2,580,000
     8             (Base Construction Allocation -
     9             $2,390,000)
    10             (Design and Contingencies - $190,000)
    11         (3)  SR 2003, 5th Street Bridge over
    12             Amtrak, City of Philadelphia, Bridge
    13             Replacement                                 2,400,000
    14             (Base Construction Allocation -
    15             $2,000,000)
    16             (Land Allocation - $200,000)
    17             (Design and Contingencies - $200,000)
    18         (4)  SR 3008, Chestnut Street Bridge over
    19             Schuylkill River, City of Philadelphia,
    20             Bridge Painting                               477,000
    21             (Base Construction Allocation -
    22             $426,000)
    23             (Design and Contingencies - $51,000)
    24         (5)  SR 3037, JFK Boulevard Bridge over
    25             Schuylkill River, City of Philadelphia,
    26             Bridge Painting                               857,000
    27             (Base Construction Allocation -
    28             $794,000)
    29             (Design and Contingencies - $63,000)
    30         (6)  SR 0095, Delaware River Expressway
    19990S0504B1471                 - 513 -

     1             over Westmoreland and Tioga Streets,
     2             City of Philadelphia, Bridge
     3             Rehabilitation                              4,450,000
     4             (Base Construction Allocation -
     5             $4,200,000)
     6             (Land Allocation - $50,000)
     7             (Design and Contingencies - $200,000)
     8         (7)  SR 0003, Chestnut Street Bridge over
     9             Amtrak, Schuylkill Expressway and 30th
    10             Street, City of Philadelphia, Bridge
    11             Replacement                                11,800,000
    12             (Base Construction Allocation -
    13             $10,000,000)
    14             (Land Allocation - $1,000,000)
    15             (Design and Contingencies - $800,000)
    16         (8)  SR 0013, Girard Avenue Bridge over
    17             Schuylkill Expressway, City of
    18             Philadelphia, Bridge Deck Replacement       1,733,000
    19             (Base Construction Allocation -
    20             $1,533,000)
    21             (Land Allocation - $50,000)
    22             (Design and Contingencies - $150,000)
    23         (9)  SR 0073, Cottman Avenue Bridge over
    24             Conrail, City of Philadelphia, Bridge
    25             Replacement                                 2,100,000
    26             (Base Construction Allocation -
    27             $1,500,000)
    28             (Land Allocation - $300,000)
    29             (Design and Contingencies - $300,000)
    30         (10)  SR 8045, GUSTINE LAKE INTERCHANGE,                   <--
    19990S0504B1471                 - 514 -

     1             FIVE STRUCTURES OVER KELLY DRIVE AND
     2             RIDGE AVENUE AND KELLY DRIVE OVER RIDGE
     3             AVENUE, CITY OF PHILADELPHIA, BRIDGE
     4             REPLACEMENTS                               11,550,000
     5             (BASE CONSTRUCTION ALLOCATION -
     6             $10,000,000)
     7             (LAND ALLOCATION - $50,000)
     8             (DESIGN AND CONTINGENCIES - $1,500,000)
     9  Section 56.  Pike County.
    10     (a)  Local Bridges (Reserved)
    11     (b)  State Bridges
    12         (1)  SR 0390, Bridge Kill Creek Bridge,
    13             North of SR 3002, Green Township,
    14             Bridge Replacement                            430,000
    15             (Base Construction Allocation -
    16             $340,000)
    17             (Land Allocation - $10,000)
    18             (Design and Contingencies - $80,000)
    19         (2)  SR 2011, Bridge over Outlet to Sawkill
    20             Pond, South of TR 6, Dingman Township,
    21             Bridge Replacement                            355,000
    22             (Base Construction Allocation -
    23             $275,000)
    24             (Land Allocation - $10,000)
    25             (Design and Contingencies - $70,000)
    26         (3)  SR 0434, Shohola Bridge over Delaware
    27             River, Shohola Township and New York
    28             State Line, Bridge Painting                 2,200,000
    29             (Base Construction Allocation -
    30             $2,000,000)
    19990S0504B1471                 - 515 -

     1             (Design and Contingencies - $200,000)
     2         (4)  State Bridges, Countywide Bridge Zone
     3             Painting, Bridge Painting                     370,000
     4             (Base Construction Allocation -
     5             $350,000)
     6             (Land Allocation - $10,000)
     7             (Design and Contingencies - $10,000)
     8  Section 57.  Potter County.
     9     (a)  Local Bridges
    10         (1)  Harrison Township, T-487 over North
    11             Branch of Cowanesque Creek, Bridge
    12             Replacement                                   174,000
    13             (Base Construction Allocation -
    14             $149,000)
    15             (Land Allocation - $10,000)
    16             (Design and Contingencies - $15,000)
    17     (b)  State Bridges
    18         (1)  SR 3015, Baker Hollow Bridge over
    19             Baker Run, Homer Township, Bridge
    20             Replacement                                   290,000
    21             (Base Construction Allocation -
    22             $200,000)
    23             (Land Allocation - $10,000)
    24             (Design and Contingencies - $80,000)
    25         (2)  SR 0006, Bridge over Allegheny River,
    26             Coudersport Borough, Bridge Painting          325,000
    27             (Base Construction Allocation -
    28             $320,000)
    29             (Design and Contingencies - $5,000)
    30         (3)  SR 4003, Bradley Run Bridge over
    19990S0504B1471                 - 516 -

     1             Bradley Run, Clara Township, Bridge
     2             Replacement                                   520,000
     3             (Base Construction Allocation -
     4             $400,000)
     5             (Land Allocation - $20,000)
     6             (Design and Contingencies - $100,000)
     7         (4)  SR 4013, North Hollow Run Bridge over
     8             Branch of North Hollow Run, Coudersport
     9             Borough and Sweden Township, Bridge
    10             Replacement                                   350,000
    11             (Base Construction Allocation -
    12             $260,000)
    13             (Land Allocation - $10,000)
    14             (Design and Contingencies - $80,000)
    15         (5)  SR 1003, Judson Run Bridge over Judson
    16             Run, Pike Township, Bridge Replacement        340,000
    17             (Base Construction Allocation -
    18             $250,000)
    19             (Land Allocation - $10,000)
    20             (Design and Contingencies - $80,000)
    21         (6)  SR 1010, Genesee River Bridge over
    22             Genesee River, Genesee Township, Bridge
    23             Painting                                       68,000
    24             (Base Construction Allocation -
    25             $58,000)
    26             (Design and Contingencies - $10,000)
    27         (7)  SR 0044, Bridge over Oswayo Creek,
    28             Shinglehouse Borough, Bridge
    29             Replacement                                 2,016,000
    30             (Base Construction Allocation -
    19990S0504B1471                 - 517 -

     1             $1,800,000)
     2             (Land Allocation - $16,000)
     3             (Design and Contingencies - $200,000)
     4  Section 58.  Schuylkill County.
     5     (a)  Local Bridges
     6         (1)  City of Pottsville, Washington Street
     7             Bridge No.2 over Conrail and PA 61,
     8             Bridge Replacement                          2,225,000
     9             (Base Construction Allocation -
    10             $2,000,000)
    11             (Land Allocation - $25,000)
    12             (Design and Contingencies - $200,000)
    13         (2)  Pine Grove Township, Penn Central
    14             Bridge over T-390, Bridge Removal             551,000
    15             (Base Construction Allocation -
    16             $435,000)
    17             (Land Allocation - $50,000)
    18             (Design and Contingencies - $66,000)
    19         (3)  Rush Township, T-862, Bridge No.42
    20             over Pine Creek, Bridge Replacement           139,000
    21             (Base Construction Allocation -
    22             $121,000)
    23             (Land Allocation - $6,000)
    24             (Design and Contingencies - $12,000)
    25         (4)  St. Clair Borough, Russell Street
    26             Bridge over Mill Creek, Bridge
    27             Replacement                                   223,000
    28             (Base Construction Allocation -
    29             $193,000)
    30             (Land Allocation - $10,000)
    19990S0504B1471                 - 518 -

     1             (Design and Contingencies - $20,000)
     2         (5)  Upper Mahantongo Township, T-473,
     3             Bridge over Mahantongo Creek, Bridge
     4             Replacement                                   202,000
     5             (Base Construction Allocation -
     6             $175,000)
     7             (Land Allocation - $9,000)
     8             (Design and Contingencies - $18,000)
     9         (6)  East Brunswick Township, T-753, Bridge
    10             over Indian Run, Bridge Replacement           400,000
    11             (Base Construction Allocation -
    12             $290,000)
    13             (Land Allocation - $10,000)
    14             (Design and Contingencies - $100,000)
    15         (7)  West Brunswick Township, County Bridge
    16             No.94 over Schuylkill River, Bridge
    17             Replacement                                   384,000
    18             (Base Construction Allocation -
    19             $384,000)
    20         (8)  Tremont Borough, Maple Street Bridge
    21             No.22 over Goodspring Creek, Bridge
    22             Replacement                                   214,000
    23             (Base Construction Allocation -
    24             $178,000)
    25             (Design and Contingencies - $36,000)
    26         (9)  Gilberton Borough, Bridge Street
    27             Bridge over Mahanoy Creek, Bridge
    28             Replacement                                   520,000
    29             (Base Construction Allocation -
    30             $400,000)
    19990S0504B1471                 - 519 -

     1             (Land Allocation - $20,000)
     2             (Design and Contingencies - $100,000)
     3         (10)  Porter Township, T-416, Bridge No.79
     4             over Wiconisco Creek, Bridge
     5             Replacement                                   287,000
     6             (Base Construction Allocation -
     7             $250,000)
     8             (Land Allocation - $12,000)
     9             (Design and Contingencies - $25,000)
    10         (11)  Union Township, T-594, Bridge over
    11             Little Catawissa Creek, Bridge
    12             Replacement                                   296,000
    13             (Base Construction Allocation -
    14             $230,000)
    15             (Land Allocation - $5,000)
    16             (Design and Contingencies - $61,000)
    17         (12)  Deer Lake Borough, Drehersville Road
    18             Bridge over Pine Creek, Bridge
    19             Replacement                                   484,000
    20             (Base Construction Allocation -
    21             $324,000)
    22             (Land Allocation - $10,000)
    23             (Design and Contingencies - $150,000)
    24         (13)  Port Carbon Borough, Mill Street
    25             Bridge No.106 over Schuylkill River,
    26             Bridge Replacement                          1,050,000
    27             (Base Construction Allocation -
    28             $750,000)
    29             (Land Allocation - $50,000)
    30             (Design and Contingencies - $250,000)
    19990S0504B1471                 - 520 -

     1         (14)  Hegins Township, T-478, Broad Street
     2             Bridge over Pine Creek, Bridge
     3             Replacement                                   357,000
     4             (Base Construction Allocation -
     5             $290,000)
     6             (Land Allocation - $5,000)
     7             (Design and Contingencies - $62,000)
     8         (15)  Frackville Borough, Spring Street
     9             Reading Railroad Bridge, Bridge
    10             Removal                                       112,000
    11             (Base Construction Allocation -
    12             $52,000)
    13             (Land Allocation - $10,000)
    14             (Design and Contingencies - $50,000)
    15         (16)  Eldred Township, T-383, Bridge over
    16             Mahantango Creek, Bridge Replacement          121,000
    17             (Base Construction Allocation -
    18             $110,000)
    19             (Design and Contingencies - $11,000)
    20         (17)  Port Clinton Borough, Broad Street,
    21             County Bridge No.123 over Schuylkill
    22             River, Bridge Replacement                     828,000
    23             (Base Construction Allocation -
    24             $692,000)
    25             (Land Allocation - $32,000)
    26             (Design and Contingencies - $104,000)
    27         (18)  South Manheim Township, T-676 County
    28             Bridge No.112 over Bear Creek, Bridge
    29             Replacement                                   470,000
    30             (Base Construction Allocation -
    19990S0504B1471                 - 521 -

     1             $300,000)
     2             (Land Allocation - $20,000)
     3             (Design and Contingencies - $150,000)
     4         (19)  Port Carbon Borough, Washington
     5             Street Bridge over Mill Creek, Bridge
     6             Replacement                                   684,000
     7             (Base Construction Allocation -
     8             $564,000)
     9             (Land Allocation - $20,000)
    10             (Design and Contingencies - $100,000)
    11         (20)  City of Pottsville, Washington Street
    12             over Conrail and SR 0061, Bridge
    13             Rehabilitation                                803,000
    14             (Base Construction Allocation -
    15             $669,000)
    16             (Design and Contingencies - $134,000)
    17         (21)  St. Clair Borough, Russell Street
    18             Bridge over Mill Creek, Bridge
    19             Replacement                                   480,000
    20             (Base Construction Allocation -
    21             $350,000)
    22             (Land Allocation - $10,000)
    23             (Design and Contingencies - $120,000)
    24         (22)  North Union Township, T-455, Bridge
    25             over Tomhicken Creek, Bridge
    26             Replacement                                   360,000
    27             (Base Construction Allocation -
    28             $250,000)
    29             (Land Allocation - $10,000)
    30             (Design and Contingencies - $100,000)
    19990S0504B1471                 - 522 -

     1         (23)  West Brunswick Township, T-723,
     2             Industrial Road over Pine Creek, Bridge
     3             Replacement                                   584,000
     4             (Base Construction Allocation -
     5             $434,000)
     6             (Land Allocation - $20,000)
     7             (Design and Contingencies - $130,000)
     8         (24)  Landingville Borough, Canal Street
     9             Bridge over Schuylkill River, Bridge
    10             Replacement                                   810,000
    11             (Base Construction Allocation -
    12             $640,000)
    13             (Land Allocation - $20,000)
    14             (Design and Contingencies - $150,000)
    15         (25)  North Manheim Township, Memorial
    16             Drive Overpass, Bridge Removal                295,000
    17             (Base Construction Allocation -
    18             $250,000)
    19             (Land Allocation - $20,000)
    20             (Design and Contingencies - $25,000)
    21         (26)  Branch Township, T-564, Bridge over
    22             Muddy Creek, Bridge Replacement               360,000
    23             (Base Construction Allocation -
    24             $250,000)
    25             (Land Allocation - $10,000)
    26             (Design and Contingencies - $100,000)
    27         (27)  Eldred Township, T-395, Bridge over
    28             Little Mahantango Creek, Bridge
    29             Replacement                                   362,000
    30             (Base Construction Allocation -
    19990S0504B1471                 - 523 -

     1             $250,000)
     2             (Land Allocation - $12,000)
     3             (Design and Contingencies - $100,000)
     4         (28)  Orwigsburg Borough, Ridge Road
     5             Bridge, Bridge Replacement                    154,000
     6             (Base Construction Allocation -
     7             $122,000)
     8             (Design and Contingencies - $32,000)
     9         (29)  West Penn Township, Kittatinny Bridge
    10             over Lizard Creek, Bridge
    11             Rehabilitation                                170,000
    12         (30)  Mahanoy City Borough, Market Street
    13             Bridge over Mahanoy Creek, Bridge
    14             Replacement                                   450,000
    15         (31)  Pine Grove Township, T-649, Bridge
    16             over Little Swatara Creek, Bridge
    17             Replacement                                   202,000
    18         (32)  Tamaqua Borough, Spruce Street Bridge
    19             over Wabash Creek, Bridge
    20             Rehabilitation                                115,000
    21     (b)  State Bridges
    22         (1)  SR 0054, SR 0054 over Mahanoy Creek,
    23             Mahanoy Township, Bridge Replacement        1,005,000
    24             (Base Construction Allocation -
    25             $770,000)
    26             (Design and Contingencies - $235,000)
    27         (2)  SR 0054, SR 0054 over Reading Blue
    28             Mountain and Northern Railroad, Mahanoy
    29             Township, Bridge Rehabilitation               650,000
    30             (Base Construction Allocation -
    19990S0504B1471                 - 524 -

     1             $500,000)
     2             (Design and Contingencies - $150,000)
     3         (3)  SR 0081, SR 0081 Southbound over
     4             Swatara Creek, Pine Grove Township,
     5             Bridge Rehabilitation                         970,000
     6             (Base Construction Allocation -
     7             $745,000)
     8             (Design and Contingencies - $225,000)
     9         (4)  SR 0081, SR 0081 Northbound over
    10             Swatara Creek, Pine Grove Township,
    11             Bridge Rehabilitation                         970,000
    12             (Base Construction Allocation -
    13             $745,000)
    14             (Design and Contingencies - $225,000)
    15         (5)  SR 0081, SR 0081 Southbound over SR
    16             0443 and Exit Ramp 3, Pine Grove
    17             Township, Bridge Rehabilitation               715,000
    18             (Base Construction Allocation -
    19             $550,000)
    20             (Design and Contingencies - $165,000)
    21         (6)  SR 0081, SR 0081 Northbound over SR
    22             0443 and Exit Ramp 31, Pine Grove
    23             Township, Bridge Rehabilitation               515,000
    24             (Base Construction Allocation -
    25             $390,000)
    26             (Design and Contingencies - $125,000)
    27         (7)  SR 0081, I-81 Southbound over T-886,
    28             Oak Grove Road, Pine Grove Township,
    29             Bridge Rehabilitation                         300,000
    30             (Base Construction Allocation -
    19990S0504B1471                 - 525 -

     1             $200,000)
     2             (Design and Contingencies - $100,000)
     3         (8)  SR 0081, I-81 Northbound over T-886,
     4             Oak Grove Road, Pine Grove Township,
     5             Bridge Rehabilitation                         300,000
     6             (Base Construction Allocation -
     7             $200,000)
     8             (Design and Contingencies - $100,000)
     9         (9)  SR 0061, Bridge over Mahannon Creek at
    10             South Liberty Street, North Manheim
    11             Township, Bridge Rehabilitation               265,000
    12             (Base Construction Allocation -
    13             $175,000)
    14             (Design and Contingencies - $90,000)
    15         (10)  SR 0895, SR 0895 over Lizard Creek,
    16             Village of Snyders, West Penn Township,
    17             Bridge Rehabilitation                         290,000
    18             (Base Construction Allocation -
    19             $190,000)
    20             (Design and Contingencies - $100,000)
    21         (11)  SR 0901, SR 0901 over Mahanoy Creek,
    22             Bridge Rehabilitation                         680,000
    23             (Base Construction Allocation -
    24             $520,000)
    25             (Design and Contingencies - $160,000)
    26         (12)  SR 1011, SR 1011 over Big Creek,
    27             Village of Brockton, Schuylkill
    28             Township, Bridge Replacement                  340,000
    29             (Base Construction Allocation -
    30             $160,000)
    19990S0504B1471                 - 526 -

     1             (Land Allocation - $55,000)
     2             (Design and Contingencies - $125,000)
     3         (13)  SR 1011, SR 1011 over Locust Creek,
     4             Ryan Township, Bridge Rehabilitation          365,000
     5             (Base Construction Allocation -
     6             $180,000)
     7             (Land Allocation - $60,000)
     8             (Design and Contingencies - $125,000)
     9         (14)  SR 2018, SR 2018 over Little
    10             Schuylkill River, Drehersville, East
    11             Brunswick Township, Bridge
    12             Rehabilitation                                385,000
    13             (Base Construction Allocation -
    14             $285,000)
    15             (Design and Contingencies - $100,000)
    16         (15)  SR 4013, SR 4013 over Rausch Creek,
    17             Hegins Township, Bridge Rehabilitation        280,000
    18             (Base Construction Allocation -
    19             $180,000)
    20             (Design and Contingencies - $100,000)
    21         (16)  SR 4022, SR 4022 over Tributary of
    22             Mahantango Creek, Eldred Township,
    23             Bridge Replacement                            310,000
    24             (Base Construction Allocation -
    25             $150,000)
    26             (Land Allocation - $50,000)
    27             (Design and Contingencies - $110,000)
    28         (17)  SR 0209, Broad Street over Little
    29             Schuylkill River, Tamaqua Borough,
    30             Bridge Replacement                            600,000
    19990S0504B1471                 - 527 -

     1             (Base Construction Allocation -
     2             $360,000)
     3             (Land Allocation - $100,000)
     4             (Design and Contingencies - $140,000)
     5         (18)  SR 4022, Broad Street Bridge over
     6             Panther Creek, Tamaqua Borough, Bridge
     7             Replacement                                 1,780,000
     8             (Base Construction Allocation -
     9             $1,220,000)
    10             (Land Allocation - $195,000)
    11             (Design and Contingencies - $365,000)
    12         (19)  SR 4022, SR 4022 over Mahanoy Creek,
    13             Village of Helfenstein, Eldred
    14             Township, Bridge Replacement                1,170,000
    15             (Base Construction Allocation -
    16             $750,000)
    17             (Land Allocation - $195,000)
    18             (Design and Contingencies - $225,000)
    19         (20)  SR 0339, SR 0339 over Catawissa
    20             Creek, North Union Township, Bridge
    21             Replacement                                   984,000
    22             (Base Construction Allocation -
    23             $630,000)
    24             (Land Allocation - $165,000)
    25             (Design and Contingencies - $189,000)
    26         (21)  SR 0443, Dock Street Bridge over
    27             Tributary of Schuylkill River, Borough
    28             of Schuylkill Haven, Bridge
    29             Replacement                                   325,000
    30             (Base Construction Allocation -
    19990S0504B1471                 - 528 -

     1             $150,000)
     2             (Land Allocation - $50,000)
     3             (Design and Contingencies - $125,000)
     4         (22)  SR 0895, SR 0895 over Schuylkill
     5             River, Bridge Replacement                   2,370,000
     6             (Base Construction Allocation -
     7             $1,480,000)
     8             (Land Allocation - $390,000)
     9             (Design and Contingencies - $500,000)
    10         (23)  SR 4011, SR 4011 over Pine Creek,
    11             Hegins Township, Bridge Replacement           720,000
    12             (Base Construction Allocation -
    13             $450,000)
    14             (Land Allocation - $120,000)
    15             (Design and Contingencies - $150,000)
    16         (24)  SR 0895, Auburn Arch over Schuylkill
    17             River, South Manheim Township, Bridge
    18             Replacement                                   550,000
    19             (Base Construction Allocation -
    20             $350,000)
    21             (Land Allocation - $50,000)
    22             (Design and Contingencies - $150,000)
    23         (25)  SR 0061, Mady's Big Bridge over
    24             Conrail, City of Pottsville, Bridge
    25             Rehabilitation                              1,323,000
    26             (Base Construction Allocation -
    27             $1,202,000)
    28             (Design and Contingencies - $121,000)
    29         (26)  SR 0061, Mady's Small Bridge over
    30             Schuylkill River, City of Pottsville,
    19990S0504B1471                 - 529 -

     1             Bridge Rehabilitation                         329,000
     2             (Base Construction Allocation -
     3             $299,000)
     4             (Design and Contingencies - $30,000)
     5         (27)  SR 0125, Pitman Bridge over Little
     6             Mahantango Creek, Eldred Township,
     7             Bridge Replacement                            480,000
     8             (Base Construction Allocation -
     9             $390,000)
    10             (Land Allocation - $10,000)
    11             (Design and Contingencies - $80,000)
    12         (28)  SR 0325, Bridge over Wiconisco Creek,
    13             Porter Township, Bridge Replacement         1,175,000
    14             (Base Construction Allocation -
    15             $800,000)
    16             (Land Allocation - $40,000)
    17             (Design and Contingencies - $335,000)
    18         (29)  SR 0501, Bridge over Little Swatara
    19             Creek, Pine Grove Township, Bridge
    20             Replacement                                 1,400,000
    21             (Base Construction Allocation -
    22             $1,000,000)
    23             (Land Allocation - $50,000)
    24             (Design and Contingencies - $350,000)
    25         (30)  SR 0501, Small Bridge over Little
    26             Swatara Creek, Pine Grove Township,
    27             Bridge Replacement                            250,000
    28             (Base Construction Allocation -
    29             $150,000)
    30             (Land Allocation - $10,000)
    19990S0504B1471                 - 530 -

     1             (Design and Contingencies - $90,000)
     2         (31)  SR 1013, Tuscarora Park Bridge over
     3             Tributary of Locust Creek, Ryan
     4             Township, Bridge Deck Replacement             485,000
     5             (Base Construction Allocation -
     6             $375,000)
     7             (Land Allocation - $10,000)
     8             (Design and Contingencies - $100,000)
     9         (32)  SR 1016, Lofty Bridge over Pocono
    10             N.E. Railroad, Delano Township, Bridge
    11             Replacement                                   715,000
    12             (Base Construction Allocation -
    13             $500,000)
    14             (Land Allocation - $15,000)
    15             (Design and Contingencies - $200,000)
    16         (33)  SR 2006, Bridge over Mahannon Creek,
    17             West Brunswick Township, Bridge
    18             Replacement                                   107,000
    19             (Base Construction Allocation -
    20             $92,000)
    21             (Land Allocation - $5,000)
    22             (Design and Contingencies - $10,000)
    23         (34)  SR 3003, Bridge over West Branch
    24             Schuylkill River, North Manheim
    25             Township, Bridge Deck Replacement             224,000
    26             (Base Construction Allocation -
    27             $195,000)
    28             (Design and Contingencies - $29,000)
    29         (35)  SR 3015, Bridge over Wiconisco Creek,
    30             Porter Township, Bridge Replacement           200,000
    19990S0504B1471                 - 531 -

     1             (Base Construction Allocation -
     2             $175,000)
     3             (Land Allocation - $8,000)
     4             (Design and Contingencies - $17,000)
     5         (36)  SR 4016, Bridge over Little
     6             Mahantango Creek, Upper Mahantongo
     7             Township, Bridge Replacement                  165,000
     8             (Base Construction Allocation -
     9             $150,000)
    10             (Design and Contingencies - $15,000)
    11         (37)  SR 4033, Bridge over Tomhicken Creek,
    12             North Union Township, Bridge Deck
    13             Replacement                                   350,000
    14             (Base Construction Allocation -
    15             $250,000)
    16             (Design and Contingencies - $100,000)
    17         (38)  SR 4036, Ringtown Bridge over Little
    18             Catawissa Creek, Union Township, Bridge
    19             Replacement                                   240,000
    20             (Base Construction Allocation -
    21             $216,000)
    22             (Land Allocation - $3,000)
    23             (Design and Contingencies - $21,000)
    24         (39)  SR 4039, Haas Bridge over Mahantango
    25             Creek, Upper Mahantongo Township,
    26             Bridge Replacement                            153,000
    27             (Base Construction Allocation -
    28             $130,000)
    29             (Land Allocation - $10,000)
    30             (Design and Contingencies - $13,000)
    19990S0504B1471                 - 532 -

     1         (40)  SR 0081, I-81 Bridges over SR 3013,
     2             Tremont Township, Bridge Deck
     3             Rehabilitation                              1,900,000
     4             (Base Construction Allocation -
     5             $1,850,000)
     6             (Design and Contingencies - $50,000)
     7         (41)  SR 0081, I-81 Bridge Deck
     8             Rehabilitation, Lebanon County Line to
     9             Ravine Township, Pine Grove and Tremont
    10             Townships, 8 Bridge Decks, Bridge
    11             Rehabilitation                              1,060,000
    12             (Base Construction Allocation -
    13             $1,000,000)
    14             (Design and Contingencies - $60,000)
    15  Section 59.  Snyder County.
    16     (a)  Local Bridges (Reserved)
    17     (b)  State Bridges
    18         (1)  SR 1011, Pine Street Bridge over Penns
    19             Creek, Selinsgrove, Bridge Painting         1,150,000
    20             (Base Construction Allocation -
    21             $940,000)
    22             (Land Allocation - $10,000)
    23             (Design and Contingencies - $200,000)
    24         (2)  SR 3002, Bridge over Mahantango Creek,
    25             1.5 Miles South of Meiserville, Perry
    26             and Chapman Townships Line, Bridge
    27             Rehabilitation                              1,425,000
    28             (Base Construction Allocation -
    29             $1,211,000)
    30             (Design and Contingencies - $214,000)
    19990S0504B1471                 - 533 -

     1         (3)  SR 4007, Middle Creek Bridge over
     2             Middle Creek, North of SR 0522 and
     3             South of SR 4012, Beaver Township,
     4             Bridge Replacement                          1,158,000
     5             (Base Construction Allocation -
     6             $926,000)
     7             (Land Allocation - $58,000)
     8             (Design and Contingencies - $174,000)
     9         (4)  SR 0522, Bridge over Middle Creek,
    10             Bridge Painting                               180,000
    11             (Base Construction Allocation -
    12             $170,000)
    13             (Design and Contingencies - $10,000)
    14         (5)  SR 0035, SR 0035 over Tributary of
    15             Mahantango Creek, Perry Township,
    16             Bridge Replacement                            815,000
    17             (Base Construction Allocation -
    18             $652,000)
    19             (Land Allocation - $41,000)
    20             (Design and Contingencies - $122,000)
    21         (6)  SR 0104, SR 0104 over Branch of
    22             Mahantango Creek, Perry Township,
    23             Bridge Replacement                            430,000
    24             (Base Construction Allocation -
    25             $345,000)
    26             (Land Allocation - $20,000)
    27             (Design and Contingencies - $65,000)
    28         (7)  SR 0104, SR 0104 over Middle Creek,
    29             Franklin Township, Bridge Replacement         440,000
    30             (Base Construction Allocation -
    19990S0504B1471                 - 534 -

     1             $350,000)
     2             (Land Allocation - $20,000)
     3             (Design and Contingencies - $70,000)
     4         (8)  SR 0522, SR 0522 over Tributary of
     5             Middle Creek, Spring Township, Bridge
     6             Replacement                                   500,000
     7             (Base Construction Allocation -
     8             $400,000)
     9             (Land Allocation - $25,000)
    10             (Design and Contingencies - $75,000)
    11         (9)  SR 0522, SR 0522 over Tributary of
    12             Middle Creek, Spring Township, Bridge
    13             Replacement                                   896,000
    14             (Base Construction Allocation -
    15             $717,000)
    16             (Land Allocation - $45,000)
    17             (Design and Contingencies - $134,000)
    18         (10)  SR 0522, SR 0522 over Tributary of
    19             Middle Creek, Beavertown Borough,
    20             Bridge Replacement                            244,000
    21             (Base Construction Allocation -
    22             $195,000)
    23             (Land Allocation - $12,000)
    24             (Design and Contingencies - $37,000)
    25         (11)  SR 0522, SR 0522 over Tributary of
    26             Middle Creek, Beavertown Borough,
    27             Bridge Replacement                            245,000
    28             (Base Construction Allocation -
    29             $196,000)
    30             (Land Allocation - $12,000)
    19990S0504B1471                 - 535 -

     1             (Design and Contingencies - $37,000)
     2         (12)  SR 0522, SR 0522 over Kern Run,
     3             Beavertown Borough, Bridge Replacement        570,000
     4             (Base Construction Allocation -
     5             $456,000)
     6             (Land Allocation - $29,000)
     7             (Design and Contingencies - $85,000)
     8         (13)  SR 0522, SR 0522 over Penns Creek,
     9             Selinsgrove Borough, Bridge
    10             Replacement                                 3,167,000
    11             (Base Construction Allocation -
    12             $2,534,000)
    13             (Land Allocation - $158,000)
    14             (Design and Contingencies - $475,000)
    15         (14)  SR 1011, SR 1011 over Tributary of
    16             Penns Creek, Jackson Township, Bridge
    17             Replacement                                   300,000
    18             (Base Construction Allocation -
    19             $190,000)
    20             (Land Allocation - $30,000)
    21             (Design and Contingencies - $80,000)
    22         (15)  SR 2013, SR 2013 over Tributary of
    23             Susquehanna River, Chapman Township,
    24             Bridge Replacement                            300,000
    25             (Base Construction Allocation -
    26             $190,000)
    27             (Land Allocation - $30,000)
    28             (Design and Contingencies - $80,000)
    29         (16)  SR 3009, SR 3009 over Paxtonville
    30             Creek, Franklin Township, Bridge
    19990S0504B1471                 - 536 -

     1             Replacement                                 1,512,000
     2             (Base Construction Allocation -
     3             $1,209,000)
     4             (Land Allocation - $76,000)
     5             (Design and Contingencies - $227,000)
     6         (17)  SR 1011, Pine Street Bridge over
     7             Penns Creek, Selinsgrove Borough,
     8             Bridge Replacement                          3,100,000
     9             (Base Construction Allocation -
    10             $2,500,000)
    11             (Land Allocation - $160,000)
    12             (Design and Contingencies - $450,000)
    13         (18)  SR 3009, Bridge over Middle Creek,
    14             Franklin Township, Bridge Painting            155,000
    15             (Base Construction Allocation -
    16             $140,000)
    17             (Design and Contingencies - $15,000)
    18         (19)  SR 0522, Middle Creek Bridge No.2,
    19             Beavertown Borough, Bridge Replacement        400,000
    20             (Base Construction Allocation -
    21             $250,000)
    22             (Land Allocation - $50,00)
    23             (Design and Contingencies - $100,000)
    24         (20)  SR 0104, Bridge over Mahantango
    25             Creek, Perry Township, Bridge
    26             Replacement                                   430,000
    27             (Base Construction Allocation -
    28             $345,000)
    29             (Land Allocation - $20,000)
    30             (Design and Contingencies - $65,000)
    19990S0504B1471                 - 537 -

     1         (21)  SR 1013, Bridge over Penns Creek,
     2             Jackson Township, Bridge
     3             Rehabilitation                              2,200,000
     4             (Base Construction Allocation -
     5             $1,700,000)
     6             (Land Allocation - $100,000)
     7             (Design and Contingencies - $400,000)
     8         (22)  SR 0235, Bridge over Tributary of
     9             Branch of Beaver Creek, Spring
    10             Township, Bridge Replacement                  565,000
    11             (Base Construction Allocation -
    12             $452,000)
    13             (Land Allocation - $28,000)
    14             (Design and Contingencies - $85,000)
    15         (23)  SR 1016, Bridge over Penns Creek,
    16             Jackson Township, Bridge Replacement        1,700,000
    17             (Base Construction Allocation -
    18             $1,400,000)
    19             (Land Allocation - $40,000)
    20             (Design and Contingencies - $260,000)
    21  Section 60.  Somerset County.
    22     (a)  Local Bridges
    23         (1)  Middlecreek Township, T-338, Blue Hole
    24             Creek Bridge over Blue Hole Creek,
    25             Bridge Replacement                            505,000
    26             (Base Construction Allocation -
    27             $400,000)
    28             (Land Allocation - $10,000)
    29             (Design and Contingencies - $95,000)
    30         (2)  Paint Borough, Pennsylvania Railroad
    19990S0504B1471                 - 538 -

     1             Bridge over Bedford Street, Bridge
     2             Replacement                                   350,000
     3             (Base Construction Allocation -
     4             $250,000)
     5             (Land Allocation - $25,000)
     6             (Design and Contingencies - $75,000)
     7         (3)  Shade Township, T-712, Lipinski Road
     8             Bridge over Dark Shade Creek, Bridge
     9             Replacement                                   560,000
    10             (Base Construction Allocation -
    11             $450,000)
    12             (Land Allocation - $10,000)
    13             (Design and Contingencies - $100,000)
    14         (4)  Somerset Borough, Church Street Bridge
    15             over Parsons Run, Bridge Replacement          350,000
    16             (Base Construction Allocation -
    17             $250,000)
    18             (Land Allocation - $25,000)
    19             (Design and Contingencies - $75,000)
    20         (5)  Windber Borough, South 22nd Street
    21             Bridge over Seese Run, Bridge
    22             Replacement                                   350,000
    23             (Base Construction Allocation -
    24             $250,000)
    25             (Land Allocation - $25,000)
    26             (Design and Contingencies - $75,000)
    27         (6)  Windber Borough, 24th Street Bridge
    28             over Seese Run, Bridge Replacement            350,000
    29             (Base Construction Allocation -
    30             $250,000)
    19990S0504B1471                 - 539 -

     1             (Land Allocation - $25,000)
     2             (Design and Contingencies - $75,000)
     3         (7)  Windber Borough, Village Street Bridge
     4             over Seese Run, Bridge Replacement            350,000
     5             (Base Construction Allocation -
     6             $250,000)
     7             (Land Allocation - $25,000)
     8             (Design and Contingencies - $75,000)
     9         (8)  Summit Township, Keystone Viaduct over
    10             SR 2006, CSX Mainline and Flaugherty
    11             Creek, Bridge Rehabilitation                  715,000
    12             (Base Construction Allocation -
    13             $663,000)
    14             (Design and Contingencies - $52,000)
    15         (9)  NEW BALTIMORE BOROUGH, T-813, BRIDGE                  <--
    16             OVER RAYSTOWN BRANCH OF JUNIATA RIVER,
    17             BRIDGE REHABILITATION                         943,000
    18             (BASE CONSTRUCTION ALLOCATION -
    19             $893,000)
    20             (DESIGN AND CONTINGENCIES - $50,000)
    21         (10)  WELLERSBURG BOROUGH, T-842, BRIDGE
    22             OVER UNNAMED STREAM, BRIDGE
    23             REPLACEMENT                                   270,000
    24             (BASE CONSTRUCTION ALLOCATION -
    25             $180,000)
    26             (LAND ALLOCATION - $30,000)
    27             (DESIGN AND CONTINGENCIES - $60,000)
    28         (11)  GREENVILLE TOWNSHIP, KEYSTONE VIADUCT
    29             BRIDGE OVER FLAUGHERTY CREEK, BRIDGE
    30             REPLACEMENT                                 1,469,000
    19990S0504B1471                 - 540 -

     1             (BASE CONSTRUCTION ALLOCATION -
     2             $1,296,000)
     3             (DESIGN AND CONTINGENCIES - $173,000)
     4         (12)  JEFFERSON TOWNSHIP, T-583, DUCK POND
     5             BRIDGE NO.28 OVER LAUREL HILL CREEK,
     6             BRIDGE REPLACEMENT                            335,000
     7             (BASE CONSTRUCTION ALLOCATION -
     8             $260,000)
     9             (LAND ALLOCATION - $10,000)
    10             (DESIGN AND CONTINGENCIES - $65,000)
    11         (13)  SOMERSET TOWNSHIP, T-480, ROBERTS
    12             BRIDGE NO.60 OVER EAST BRANCH OF COXES
    13             CREEK, BRIDGE REPLACEMENT                     385,000
    14             (BASE CONSTRUCTION ALLOCATION -
    15             $300,000)
    16             (LAND ALLOCATION - $10,000)
    17             (DESIGN AND CONTINGENCIES - $75,000)
    18         (14)  SOMERSET TOWNSHIP, T-494, HOUSEFELDT
    19             BRIDGE NO.61 OVER COXES CREEK, BRIDGE
    20             REPLACEMENT                                   285,000
    21             (BASE CONSTRUCTION ALLOCATION -
    22             $215,000)
    23             (LAND ALLOCATION - $10,000)
    24             (DESIGN AND CONTINGENCIES - $60,000)
    25         (15)  STONEYCREEK TOWNSHIP, T-515, BRADY
    26             BRIDGE NO.64 OVER STONY CREEK, BRIDGE
    27             REPLACEMENT                                   946,000
    28             (BASE CONSTRUCTION ALLOCATION -
    29             $806,000)
    30             (LAND ALLOCATION - $10,000)
    19990S0504B1471                 - 541 -

     1             (DESIGN AND CONTINGENCIES - $130,000)
     2     (b)  State Bridges
     3         (1)  SR 0160, SR 0160 over Tributary of
     4             Boones Run, Stoney Creek Township,
     5             Bridge Replacement                            580,000
     6             (Base Construction Allocation -
     7             $430,000)
     8             (Land Allocation - $25,000)
     9             (Design and Contingencies - $125,000)
    10         (2)  SR 0523, SR 0523 over Whites Creek,
    11             Addison Township, Bridge Replacement          690,000
    12             (Base Construction Allocation -
    13             $510,000)
    14             (Land Allocation - $50,000)
    15             (Design and Contingencies - $130,000)
    16         (3)  SR 1007, SR 1007 over Lambert Run,
    17             Stoney Creek Township, Bridge
    18             Replacement                                   490,000
    19             (Base Construction Allocation -
    20             $355,000)
    21             (Land Allocation - $25,000)
    22             (Design and Contingencies - $110,000)
    23         (4)  SR 1017, SR 1017 over Breastwork Run,
    24             Allegheny Township, Bridge Replacement        650,000
    25             (Base Construction Allocation -
    26             $490,000)
    27             (Land Allocation - $25,000)
    28             (Design and Contingencies - $135,000)
    29         (5)  SR 1017, SR 1017 over Breastwork Run,
    30             Allegheny Township, Bridge Replacement        580,000
    19990S0504B1471                 - 542 -

     1             (Base Construction Allocation -
     2             $440,000)
     3             (Land Allocation - $25,000)
     4             (Design and Contingencies - $135,000)
     5         (6)  SR 1018, SR 1018 over Beaverdam Run,
     6             Shade Township, Bridge Replacement            545,000
     7             (Base Construction Allocation -
     8             $400,000)
     9             (Land Allocation - $25,000)
    10             (Design and Contingencies - $120,000)
    11         (7)  SR 1018, SR 1018 over Beaverdam Run,
    12             Shade Township, Bridge Replacement            515,000
    13             (Base Construction Allocation -
    14             $375,000)
    15             (Land Allocation - $25,000)
    16             (Design and Contingencies - $115,000)
    17         (8)  SR 2005, SR 2005 over Elk Lick Creek,
    18             Elk Lick Township, Bridge Replacement         520,000
    19             (Base Construction Allocation -
    20             $380,000)
    21             (Land Allocation - $25,000)
    22             (Design and Contingencies - $115,000)
    23         (9)  SR 4013, SR 4013 over North Branch of
    24             Quemahoning Creek, Lincoln Township,
    25             Bridge Replacement                            585,000
    26             (Base Construction Allocation -
    27             $435,000)
    28             (Land Allocation - $25,000)
    29             (Design and Contingencies - $125,000)
    30         (10)  SR 4019, SR 4019 over Quemahoning
    19990S0504B1471                 - 543 -

     1             Creek, Quemahoning Township, Bridge
     2             Replacement                                   800,000
     3             (Base Construction Allocation -
     4             $625,000)
     5             (Land Allocation - $25,000)
     6             (Design and Contingencies - $150,000)
     7         (11)  SR 3039, SR 3039 over Allen Creek,
     8             Middlecreek Township, Bridge
     9             Replacement                                   200,000
    10             (Base Construction Allocation -
    11             $150,000)
    12             (Land Allocation - $5,000)
    13             (Design and Contingencies - $45,000)
    14         (12)  SR 3039, SR 3039 over Allen Creek,
    15             Middlecreek Township, Bridge
    16             Replacement                                   220,000
    17             (Base Construction Allocation -
    18             $150,000)
    19             (Land Allocation - $10,000)
    20             (Design and Contingencies - $60,000)
    21         (13)  SR 4001, SR 4001 over Clear Run,
    22             Jefferson Township, Bridge Replacement        295,000
    23             (Base Construction Allocation -
    24             $200,000)
    25             (Land Allocation - $10,000)
    26             (Design and Contingencies - $85,000)
    27         (14)  SR 3039, Allen Creek Bridge No.3 over
    28             Allen Creek, Middlecreek Township,
    29             Bridge Replacement                            425,000
    30             (Base Construction Allocation -
    19990S0504B1471                 - 544 -

     1             $300,000)
     2             (Land Allocation - $25,000)
     3             (Design and Contingencies - $100,000)
     4         (15)  SR 4006, Quemahoning Creek Bridge
     5             over Quemahoning Creek, Jenner
     6             Township, Bridge Replacement                  625,000
     7             (Base Construction Allocation -
     8             $425,000)
     9             (Land Allocation - $75,000)
    10             (Design and Contingencies - $125,000)
    11         (16)  SR 4026, Coxes Creek Bridge over East
    12             Branch Coxes Creek, Somerset Borough,
    13             Bridge Replacement                            835,000
    14             (Base Construction Allocation -
    15             $610,000)
    16             (Land Allocation - $75,000)
    17             (Design and Contingencies - $150,000)
    18         (17)  SR 4016, Bens Creek Bridge over South
    19             Fork Bens Creek, Conemaugh Township,
    20             Bridge Replacement                            700,000
    21             (Base Construction Allocation -
    22             $515,000)
    23             (Land Allocation - $50,000)
    24             (Design and Contingencies - $135,000)
    25         (18)  SR 0030, Bridge over Calendar Run,
    26             Stoney Creek Township, Bridge
    27             Rehabilitation                                 55,000
    28             (Base Construction Allocation -
    29             $40,000)
    30             (Land Allocation - $1,000)
    19990S0504B1471                 - 545 -

     1             (Design and Contingencies - $14,000)
     2         (19)  SR 4029, Bridge over Riffle Run,
     3             Conemaugh Township, Bridge
     4             Rehabilitation                                 64,000
     5             (Base Construction Allocation -
     6             $47,000)
     7             (Land Allocation - $1,000)
     8             (Design and Contingencies - $16,000)
     9  Section 61.  Sullivan County.
    10     (a)  Local Bridges
    11         (1)  Forks Township, T-448, Old TR 87
    12             Bridge, County Bridge No.55 over Little
    13             Loyalsock Creek, Bridge Replacement           860,000
    14             (Base Construction Allocation -
    15             $700,000)
    16             (Land Allocation - $10,000)
    17             (Design and Contingencies - $150,000)
    18         (2)  Forks and Laporte Townships, T-346
    19             over Loyalsock Creek, Bridge
    20             Replacement                                   840,000
    21             (Base Construction Allocation -
    22             $730,000)
    23             (Land Allocation - $10,000)
    24             (Design and Contingencies - $100,000)
    25     (b)  State Bridges
    26         (1)  SR 0087, SR 0087 over Lick Run, Forks
    27             Township, Bridge Replacement                  635,000
    28             (Base Construction Allocation -
    29             $508,000)
    30             (Land Allocation - $32,000)
    19990S0504B1471                 - 546 -

     1             (Design and Contingencies - $95,000)
     2         (2)  SR 0087, SR 0087 over Little Loyalsock
     3             Creek, Cherry Township, Bridge
     4             Replacement                                   655,000
     5             (Base Construction Allocation -
     6             $524,000)
     7             (Land Allocation - $33,000)
     8             (Design and Contingencies - $98,000)
     9         (3)  SR 0154, SR 0154 over Black Water Run,
    10             Elkland Township, Bridge Replacement          194,000
    11             (Base Construction Allocation -
    12             $166,000)
    13             (Design and Contingencies - $28,000)
    14         (4)  SR 0154, SR 0154 over Kings Creek,
    15             Elkland Township, Bridge Replacement          404,000
    16             (Base Construction Allocation -
    17             $323,000)
    18             (Land Allocation - $20,000)
    19             (Design and Contingencies - $61,000)
    20         (5)  SR 1012, SR 1012 over Little Loyalsock
    21             Creek, Cherry Township, Bridge
    22             Replacement                                   260,000
    23             (Base Construction Allocation -
    24             $208,000)
    25             (Land Allocation - $13,000)
    26             (Design and Contingencies - $39,000)
    27         (6)  SR 0154, Lincoln Falls Bridge over Elk
    28             Creek, Elkland Township, Bridge
    29             Replacement                                 1,750,000
    30             (Base Construction Allocation -
    19990S0504B1471                 - 547 -

     1             $1,500,000)
     2             (Land Allocation - $100,000)
     3             (Design and Contingencies - $150,000)
     4         (7)  SR 0154, Hoagland Branch Bridge over
     5             Hoagland Branch, Fox Township, Bridge
     6             Replacement                                   539,000
     7             (Base Construction Allocation -
     8             $300,000)
     9             (Land Allocation - $19,000)
    10             (Design and Contingencies - $220,000)
    11  Section 62.  Susquehanna County.
    12     (a)  Local Bridges (Reserved)
    13     (b)  State Bridges
    14         (1)  SR 0167, Owego Street Bridge over
    15             Branch of Fall Brook, Bridgewater
    16             Township, Bridge Replacement                  413,000
    17             (Base Construction Allocation -
    18             $342,000)
    19             (Land Allocation - $10,000)
    20             (Design and Contingencies - $61,000)
    21         (2)  SR 1016, Salt Lick Creek Bridge over
    22             Branch of Salt Lick Creek, New Milford
    23             Township, Bridge Replacement                  100,000
    24             (Base Construction Allocation -
    25             $86,000)
    26             (Land Allocation - $3,000)
    27             (Design and Contingencies - $11,000)
    28         (3)  SR 0081, Bridge over Trowbridge Creek,
    29             1 Mile South of the Pennsylvania and
    30             New York State Line, Great Bend
    19990S0504B1471                 - 548 -

     1             Township, Bridge Replacement                  890,000
     2             (Base Construction Allocation -
     3             $700,000)
     4             (Land Allocation - $10,000)
     5             (Design and Contingencies - $180,000)
     6         (4)  SR 1017, Gulf Street Bridge, 0.5 Mile
     7             North of SR 1015, Lanesboro Borough,
     8             Bridge Replacement                            305,000
     9             (Base Construction Allocation -
    10             $220,000)
    11             (Land Allocation - $10,000)
    12             (Design and Contingencies - $75,000)
    13         (5)  SR 3003, Bridge over Transue Creek,
    14             1.5 Miles South of SR 3005, Auburn
    15             Township, Bridge Painting                      60,000
    16             (Base Construction Allocation -
    17             $50,000)
    18             (Design and Contingencies - $10,000)
    19         (6)  SR 3006, Bridge over White Creek, 1.5
    20             Miles West of SR 3004, Springville
    21             Township, Bridge Painting                      70,000
    22             (Base Construction Allocation -
    23             $60,000)
    24             (Design and Contingencies - $10,000)
    25         (7)  SR 0011, Bridge over Salt Lick Creek,
    26             0.6 Mile North of TR 492, New Milford
    27             Borough, Bridge Replacement                   660,000
    28             (Base Construction Allocation -
    29             $510,000)
    30             (Land Allocation - $20,000)
    19990S0504B1471                 - 549 -

     1             (Design and Contingencies - $130,000)
     2         (8)  SR 0367, Bridge over Tuscarora Creek,
     3             North of SR 3005, Auburn Township,
     4             Bridge Replacement                            330,000
     5             (Base Construction Allocation -
     6             $265,000)
     7             (Land Allocation - $10,000)
     8             (Design and Contingencies - $65,000)
     9         (9)  SR 1010, Bridge over Bedbug Creek,
    10             West of SR 1021, Oakland Township,
    11             Bridge Replacement                            325,000
    12             (Base Construction Allocation -
    13             $250,000)
    14             (Land Allocation - $10,000)
    15             (Design and Contingencies - $65,000)
    16         (10)  SR 1010, Bridge over Tributary of
    17             Susquehanna River, 2 Miles West of SR
    18             1021, Great Bend Township, Bridge
    19             Replacement                                   288,000
    20             (Base Construction Allocation -
    21             $220,000)
    22             (Land Allocation - $10,000)
    23             (Design and Contingencies - $58,000)
    24         (11)  SR 2046, Bridge over Branch of
    25             Tunkhannock Creek, East of TR 92,
    26             Gibson Township, Bridge Replacement           513,000
    27             (Base Construction Allocation -
    28             $400,000)
    29             (Land Allocation - $10,000)
    30             (Design and Contingencies - $103,000)
    19990S0504B1471                 - 550 -

     1         (12)  SR 3017, Bridge over Thomas Creek,
     2             Southeast of TR 29, Springville
     3             Township, Bridge Replacement                  285,000
     4             (Base Construction Allocation -
     5             $220,000)
     6             (Land Allocation - $10,000)
     7             (Design and Contingencies - $50,000)
     8         (13)  State Bridges, Countywide Bridge Zone
     9             Painting, Bridge Painting                     370,000
    10             (Base Construction Allocation -
    11             $350,000)
    12             (Land Allocation - $10,000)
    13             (Design and Contingencies - $10,000)
    14         (14)  SR 0858, Branch of Apolacon Creek,
    15             0.3 Mile North of SR 4013, Apolacon
    16             Township, Bridge Replacement                  220,000
    17             (Base Construction Allocation -
    18             $180,000)
    19             (Land Allocation - $10,000)
    20             (Design and Contingencies - $30,000)
    21         (15)  SR 1010, SR 1010 over Tributary of
    22             Susquehanna River, Great Bend Township,
    23             Bridge Replacement                            230,000
    24             (Base Construction Allocation -
    25             $190,000)
    26             (Land Allocation - $10,000)
    27             (Design and Contingencies - $30,000)
    28         (16)  SR 1010, SR 1010 over Bedbug Creek,
    29             Oakland Township, Bridge Replacement          270,000
    30             (Base Construction Allocation -
    19990S0504B1471                 - 551 -

     1             $220,000)
     2             (Land Allocation - $10,000)
     3             (Design and Contingencies - $40,000)
     4         (17)  SR 2046, SR 2046 over Tunkhannock
     5             Creek, Gibson Township, Bridge
     6             Replacement                                   440,000
     7             (Base Construction Allocation -
     8             $370,000)
     9             (Land Allocation - $10,000)
    10             (Design and Contingencies - $60,000)
    11         (18)  SR 1011, Bridge over Hemlock Creek,
    12             0.2 Mile North of SR 1009, Harmony
    13             Township, Bridge Replacement                  330,000
    14             (Base Construction Allocation -
    15             $280,000)
    16             (Land Allocation - $10,000)
    17             (Design and Contingencies - $40,000)
    18         (19)  SR 4002, Bridge over Choconut Creek,
    19             0.1 Mile East of TR 267, Choconut
    20             Township, Bridge Replacement                  290,000
    21             (Base Construction Allocation -
    22             $240,000)
    23             (Land Allocation - $10,000)
    24             (Design and Contingencies - $40,000)
    25         (20)  SR 3009, Bridge over White Creek, 1.8
    26             Miles North of County Line, Auburn
    27             Township, Bridge Replacement                  240,000
    28             (Base Construction Allocation -
    29             $200,000)
    30             (Land Allocation - $10,000)
    19990S0504B1471                 - 552 -

     1             (Design and Contingencies - $30,000)
     2         (21)  SR 3023, Bridge over East Branch of
     3             Wyalusing Creek, 0.1 Mile South of TR
     4             706, Rush Township, Bridge Replacement
     5             and Intersection Realignment                1,520,000
     6             (Base Construction Allocation -
     7             $1,300,000)
     8             (Land Allocation - $20,000)
     9             (Design and Contingencies - $200,000)
    10         (22)  SR 4008, Bridge over Laurel Lake
    11             Creek, 1.7 Miles East of TR 167, Silver
    12             Lake Township, Bridge Replacement             430,000
    13             (Base Construction Allocation -
    14             $360,000)
    15             (Land Allocation - $10,000)
    16             (Design and Contingencies - $60,000)
    17         (23)  SR 0000, Cemetery Road Bridge over
    18             Dewing Creek, Little Meadows Borough,
    19             Bridge Replacement                            300,000
    20             (Base Construction Allocation -
    21             $250,000)
    22             (Land Allocation - $10,000)
    23             (Design and Contingencies - $40,000)
    24         (24)  SR 1012, Bridge over Salt Lick Creek,
    25             New Milford Township, Bridge
    26             Rehabilitation                                 95,000
    27             (Base Construction Allocation -
    28             $75,000)
    29             (Land Allocation - $5,000)
    30             (Design and Contingencies - $15,000)
    19990S0504B1471                 - 553 -

     1         (25)  SR 0011, DELAWARE AND HUDSON RAILWAY                 <--
     2             OVERPASS, CONCRETE REPAIRS                    150,000
     3             (BASE CONSTRUCTION ALLOCATION -
     4             $128,000)
     5             (DESIGN AND CONTINGENCIES - $22,000)
     6         (26)  SR 2032, BRIDGE OVER DELAWARE AND
     7             HUDSON RAILWAY, HARTFORD TOWNSHIP,
     8             REPAIR CONCRETE PARAPETS                       75,000
     9             (BASE CONSTRUCTION ALLOCATION -
    10             $64,000)
    11             (DESIGN AND CONTINGENCIES - $11,000)
    12         (27)  SR 2024, DELAWARE AND HUDSON RAILWAY
    13             OVERPASS, BROOKLYN TOWNSHIP, REPAIR
    14             MASONRY AND INSTALL DRAIN                      31,000
    15             (BASE CONSTRUCTION ALLOCATION -
    16             $26,000)
    17             (DESIGN AND CONTINGENCIES - $5,000)
    18  Section 63.  Tioga County.
    19     (a)  Local Bridges
    20         (1)  Elkland Borough, North Buffalo Street
    21             over Camp Brook Creek, Bridge
    22             Replacement                                   510,000
    23             (Base Construction Allocation) -
    24             $360,000)
    25             (Land Allocation - $20,000)
    26             (Design and Contingencies - $130,000)
    27         (2)  Middlebury Township, T-658 (Monkey Run
    28             Road), Bridge over Tributary of Losey
    29             Creek, Bridge Replacement                     390,000
    30             (Base Construction Allocation -
    19990S0504B1471                 - 554 -

     1             $250,000)
     2             (Land Allocation - $10,000)
     3             (Design and Contingencies - $130,000)
     4         (3)  Farmington Township, T-758 (Short Hole
     5             Road), Bridge over Thorn Bottom Creek,
     6             Bridge Replacement                            390,000
     7             (Base Construction Allocation -
     8             $250,000)
     9             (Land Allocation - $10,000)
    10             (Design and Contingencies - $130,000)
    11         (4)  Tioga Township, T-726, Upper Bear
    12             Creek Road Bridge over Crooked Creek,
    13             Bridge Replacement                          1,550,000
    14             (Base Construction Allocation -
    15             $1,250,000)
    16             (Design and Contingencies - $300,000)
    17         (5)  Farmington Township, T-657, Bridge
    18             No.6 over Elkhorn Creek, Bridge
    19             Replacement                                   430,000
    20             (Base Construction Allocation -
    21             $300,000)
    22             (Land Allocation - $30,000)
    23             (Design and Contingencies - $100,000)
    24         (6)  Farmington Township, T-657, Bridge
    25             over Elkhorn Creek, Bridge Replacement        430,000
    26             (Base Construction Allocation -
    27             $300,000)
    28             (Land Allocation - $30,000)
    29             (Design and Contingencies - $100,000)
    30         (7)  Jackson Township, T-952, Bridge over
    19990S0504B1471                 - 555 -

     1             Hammond Creek, Bridge Replacement             610,000
     2             (Base Construction Allocation -
     3             $480,000)
     4             (Land Allocation - $30,000)
     5             (Design and Contingencies - $100,000)
     6         (8)  Sullivan Township, T-469, Bridge over
     7             Cory Creek, Bridge Replacement                225,000
     8             (Base Construction Allocation -
     9             $125,000)
    10             (Land Allocation - $20,000)
    11             (Design and Contingencies - $80,000)
    12         (9)  RICHMOND TOWNSHIP, BRIDGE ON MILL                     <--
    13             ROAD, BRIDGE REPLACEMENT                      500,000
    14         (10)  OSCEOLA TOWNSHIP, T-743, RED HOUSE
    15             BRIDGE OVER HOLDEN CREEK, BRIDGE
    16             REPLACEMENT                                   350,000
    17     (b)  State Bridges
    18         (1)  SR 0249, Losey Creek Bridge, South of
    19             SR 4017 in Village of Keeneyville,
    20             Middlebury Township, Bridge
    21             Rehabilitation                                250,000
    22             (Base Construction Allocation -
    23             $210,000)
    24             (Land Allocation - $5,000)
    25             (Design and Contingencies - $35,000)
    26         (2)  SR 1002, Corey Creek Bridge over Corey
    27             Creek, Northeast of Mansfield, Bridge
    28             Replacement                                   346,000
    29             (Base Construction Allocation -
    30             $277,000)
    19990S0504B1471                 - 556 -

     1             (Land Allocation - $17,000)
     2             (Design and Contingencies - $52,000)
     3         (3)  SR 3001, Kettle Creek Bridge, 11 Miles
     4             South of Watrous, Bridge Replacement          366,000
     5             (Base Construction Allocation -
     6             $293,000)
     7             (Land Allocation - $18,000)
     8             (Design and Contingencies - $55,000)
     9         (4)  SR 3023, Heise Run North Bridge, West
    10             of Wellsboro, Bridge Replacement              240,000
    11             (Base Construction Allocation -
    12             $192,000)
    13             (Land Allocation - $12,000)
    14             (Design and Contingencies - $36,000)
    15         (5)  SR 4017, Holden Creek Bridge No.1,
    16             Bridge Replacement                            584,000
    17             (Base Construction Allocation -
    18             $467,000)
    19             (Land Allocation - $29,000)
    20             (Design and Contingencies - $88,000)
    21         (6)  SR 4024, Elkhorn Creek Bridge, West of
    22             Tioga Borough, Bridge Replacement             451,000
    23             (Base Construction Allocation -
    24             $401,000)
    25             (Land Allocation - $15,000)
    26             (Design and Contingencies - $35,000)
    27         (7)  SR 3007, Bridge over Stoney Fork
    28             Creek, Bridge Painting                        160,000
    29             (Base Construction Allocation -
    30             $150,000)
    19990S0504B1471                 - 557 -

     1             (Design and Contingencies - $10,000)
     2         (8)  SR 4017, Bridge over Cowanesque River,
     3             Bridge Painting                               475,000
     4             (Base Construction Allocation -
     5             $465,000)
     6             (Design and Contingencies - $10,000)
     7         (9)  SR 0049, SR 0049 over Cowanesque
     8             River, Westfield Township, Bridge
     9             Replacement                                 1,802,000
    10             (Base Construction Allocation -
    11             $1,442,000)
    12             (Land Allocation - $90,000)
    13             (Design and Contingencies - $270,000)
    14         (10)  SR 0287, SR 0287 over Wellsboro
    15             Street - Conrail, Tioga Township,
    16             Bridge Replacement                          1,709,000
    17             (Base Construction Allocation -
    18             $1,367,000)
    19             (Land Allocation - $86,000)
    20             (Design and Contingencies - $256,000)
    21         (11)  SR 0328, SR 0328 over Hammond Creek,
    22             Jackson Township, Bridge Replacement          256,000
    23             (Base Construction Allocation -
    24             $205,000)
    25             (Land Allocation - $13,000)
    26             (Design and Contingencies - $38,000)
    27         (12)  SR 0349, SR 0349 over Mill Creek,
    28             Clymer Township, Bridge Replacement         1,000,000
    29             (Base Construction Allocation -
    30             $800,000)
    19990S0504B1471                 - 558 -

     1             (Land Allocation - $50,000)
     2             (Design and Contingencies - $150,000)
     3         (13)  SR 1030, SR 1030 over Conrail, Tioga
     4             Township, Bridge Replacement                  561,000
     5             (Base Construction Allocation -
     6             $449,000)
     7             (Land Allocation - $28,000)
     8             (Design and Contingencies - $84,000)
     9         (14)  SR 2017, SR 2017 over Mill Creek,
    10             Union Township, Bridge Replacement            584,000
    11             (Base Construction Allocation -
    12             $467,000)
    13             (Land Allocation - $27,000)
    14             (Design and Contingencies - $88,000)
    15         (15)  SR 4017, SR 4017 Bridge No.2 over
    16             Holden Creek, Osceola Township, Bridge
    17             Replacement                                   542,000
    18             (Base Construction Allocation -
    19             $434,000)
    20             (Land Allocation - $27,000)
    21             (Design and Contingencies - $81,000)
    22         (16)  SR 0015, Mill Creek Bridge spanning
    23             Tioga Dam Impoundment at Confluence,
    24             Two-Lane Bridge Construction                6,875,000
    25             (Base Construction Allocation -
    26             $6,250,000)
    27             (Design and Contingencies - $625,000)
    28         (17)  PA 249, Bridge over Crooked Creek,
    29             Village of Little Marsh, Chatham
    30             Township, Bridge Replacement                1,250,000
    19990S0504B1471                 - 559 -

     1             (Base Construction Allocation -
     2             $1,000,000)
     3             (Land Allocation - $50,000)
     4             (Design and Contingencies - $200,000)
     5         (18)  SR 1032, Crooked Creek Bridge over
     6             Crooked Creek, Tioga Township, Bridge
     7             Replacement                                 1,550,000
     8             (Base Construction Allocation -
     9             $1,250,000)
    10             (Land Allocation - $50,000)
    11             (Design and Contingencies - $250,000)
    12  Section 64.  Union County.
    13     (a)  Local Bridges (Reserved)                                  <--
    14     (A)  LOCAL BRIDGES                                             <--
    15         (1)  HARTLEY TOWNSHIP, T-320, OLD RED
    16             COVERED BRIDGE OVER PENN'S CREEK,
    17             COVERED BRIDGE REHABILITATION               1,050,000
    18             (BASE CONSTRUCTION ALLOCATION -
    19             $850,000)
    20             (LAND ALLOCATION - $50,000)
    21             (DESIGN AND CONTINGENCIES - $150,000)
    22         (2)  WHITE DEER TOWNSHIP, T-516, FACTORY
    23             ROAD COVERED BRIDGE OVER WHITE DEER
    24             CREEK, COVERED BRIDGE REPLACEMENT             726,000
    25             (BASE CONSTRUCTION ALLOCATION -
    26             $556,000)
    27             (LAND ALLOCATION - $50,000)
    28             (DESIGN AND CONTINGENCIES - $120,000)
    29         (3)  WHITE DEER TOWNSHIP, T-404, BRIDGE
    30             OVER LITTLE BUFFALO CREEK, BRIDGE
    19990S0504B1471                 - 560 -

     1             REPLACEMENT                                   320,000
     2             (BASE CONSTRUCTION ALLOCATION -
     3             $320,000)
     4     (b)  State Bridges
     5         (1)  SR 0192, Rapid Run Bridge II over
     6             Rapid Run, Lewis Township, Bridge
     7             Rehabilitation                                250,000
     8             (Base Construction Allocation -
     9             $200,000)
    10             (Land Allocation - $13,000)
    11             (Design and Contingencies - $37,000)
    12         (2)  SR 0192, Rapid Run Bridge I over Rapid
    13             Run, Lewis Township, Bridge
    14             Rehabilitation                                205,000
    15             (Base Construction Allocation -
    16             $164,000)
    17             (Land Allocation - $10,000)
    18             (Design and Contingencies - $31,000)
    19         (3)  SR 0044, Bridge over Spring Creek,
    20             Gregg Township, Bridge Painting               110,000
    21             (Base Construction Allocation -
    22             $100,000)
    23             (Design and Contingencies - $10,000)
    24         (4)  SR 1004, Bridge over Little Buffalo
    25             Creek, Kelly Township, Bridge Painting         75,000
    26             (Base Construction Allocation -
    27             $65,000)
    28             (Design and Contingencies - $10,000)
    29         (5)  SR 1012, Bridge over White Deer Hole
    30             Creek, Gregg Township, Bridge Painting        160,000
    19990S0504B1471                 - 561 -

     1             (Base Construction Allocation -
     2             $150,000)
     3             (Design and Contingencies - $10,000)
     4         (6)  SR 0235, SR 0235 over Laurel Run,
     5             Hartley Township, Bridge Replacement        1,118,000
     6             (Base Construction Allocation -
     7             $894,000)
     8             (Land Allocation - $56,000)
     9             (Design and Contingencies - $168,000)
    10         (7)  SR 0235, SR 0235 over Buffalo Creek,
    11             Lewis Township, Bridge Replacement            395,000
    12             (Base Construction Allocation -
    13             $316,000)
    14             (Land Allocation - $20,000)
    15             (Design and Contingencies - $59,000)
    16         (8)  US 15, Bridge over White Deer Hole
    17             Creek, Village of Allenwood, Gregg
    18             Township, Deck Replacement                  1,850,000
    19             (Base Construction Allocation -
    20             $1,500,000)
    21             (Land Allocation - $50,000)
    22             (Design and Contingencies - $300,000)
    23         (9)  US 15, Bridge over SR 1004, Village of
    24             West Milton, Kelly Township,
    25             Superstructure Replacement                  2,450,000
    26             (Base Construction Allocation -
    27             $2,000,000)
    28             (Land Allocation - $50,000)
    29             (Design and Contingencies - $400,000)
    30         (10)  US 15, Bridge over White Deer Creek,
    19990S0504B1471                 - 562 -

     1             White Deer Township, Deck Replacement       2,430,000
     2             (Base Construction Allocation -
     3             $2,000,000)
     4             (Land Allocation - $30,000)
     5             (Design and Contingencies - $400,000)
     6         (11)  US 15, Bridge over SR 1010, White
     7             Deer Township, Deck Replacement             1,230,000
     8             (Base Construction Allocation -
     9             $1,000,000)
    10             (Land Allocation - $30,000)
    11             (Design and Contingencies - $200,000)
    12         (12)  SR 3003, Bridge over Buffalo Creek,
    13             Lewis Township, Bridge Replacement            450,000
    14             (Base Construction Allocation -
    15             $350,000)
    16             (Land Allocation - $20,000)
    17             (Design and Contingencies - $80,000)
    18         (13)  SR 3004, Bridge over Laurel Run,
    19             Hartley Township, Bridge Replacement          723,000
    20             (Base Construction Allocation -
    21             $578,000)
    22             (Land Allocation - $36,000)
    23             (Design and Contingencies - $109,000)
    24         (14)  SR 3004, Bridge over Cedar Run,
    25             Limestone Township, Bridge Replacement        380,000
    26             (Base Construction Allocation -
    27             $280,000)
    28             (Land Allocation - $20,000)
    29             (Design and Contingencies - $80,000)
    30         (15)  SR 3003, Eighth Street Bridge,
    19990S0504B1471                 - 563 -

     1             Mifflinburg Borough, Bridge
     2             Replacement                                   630,000
     3             (Base Construction Allocation -
     4             $504,000)
     5             (Land Allocation - $32,000)
     6             (Design and Contingencies - $94,000)
     7         (16)  SR 0192, Rapid Run Bridge III over
     8             Rapid Run, Hartley Township, Bridge
     9             Replacement                                   660,000
    10             (Base Construction Allocation -
    11             $528,000)
    12             (Land Allocation - $33,000)
    13             (Design and Contingencies - $99,000)
    14  Section 65.  Venango County.
    15     (a)  Local Bridges
    16         (1)  Richland Township, T-552 over Mill
    17             Creek, Bridge Replacement                     475,000
    18             (Base Construction Allocation -
    19             $355,000)
    20             (Land Allocation - $10,000)
    21             (Design and Contingencies - $110,000)
    22         (2)  Richland Township, T-361 over Unnamed
    23             Tributary of Mill Creek, Bridge
    24             Replacement                                   360,000
    25             (Base Construction Allocation -
    26             $265,000)
    27             (Land Allocation - $10,000)
    28             (Design and Contingencies - $85,000)
    29         (3)  Richland Township, T-377 over Sage
    30             Run, Bridge Replacement                       385,000
    19990S0504B1471                 - 564 -

     1             (Base Construction Allocation -
     2             $290,000)
     3             (Land Allocation - $10,000)
     4             (Design and Contingencies - $85,000)
     5         (4)  Pinegrove Township, T-628 over East
     6             Sandy Creek, Bridge Replacement               363,000
     7             (Base Construction Allocation -
     8             $307,000)
     9             (Land Allocation - $6,000)
    10             (Design and Contingencies - $50,000)
    11         (5)  Cranberry Township, T-679 over Branch
    12             of Sage Run, Bridge Replacement               106,000
    13             (Base Construction Allocation -
    14             $100,000)
    15             (Land Allocation - $1,000)
    16             (Design and Contingencies - $5,000)
    17         (6)  Oakland Township, T-567 over Branch of
    18             Two Mile Run, Bridge Replacement              106,000
    19             (Base Construction Allocation -
    20             $100,000)
    21             (Land Allocation - $1,000)
    22             (Design and Contingencies - $5,000)
    23         (7)  Rockland Township, T-512 over East
    24             Sandy Creek, Bridge Replacement               360,000
    25             (Base Construction Allocation -
    26             $300,000)
    27             (Land Allocation - $10,000)
    28             (Design and Contingencies - $50,000)
    29         (8)  Pinegrove Township, T-628 over East
    30             Sandy Creek, Bridge Replacement               510,000
    19990S0504B1471                 - 565 -

     1             (Base Construction Allocation -
     2             $400,000)
     3             (Land Allocation - $10,000)
     4             (Design and Contingencies - $100,000)
     5         (9)  Cherrytree Township, T-520, Baker Road
     6             Bridge over Prather Creek, Bridge
     7             Replacement                                   360,000
     8         (10)  Cherrytree Township, T-649, Fairview
     9             Road Bridge over Branch of Prather
    10             Creek, Bridge Replacement                     360,000
    11         (11)  Canal Township, T-323, Bridge over
    12             Tributary of McCune Run, Bridge
    13             Replacement                                   150,000
    14         (12)  Canal Township, T-323, Bridge over
    15             McCune Run, Bridge Replacement                150,000
    16         (13)  Canal Township, T-323, Bridge over
    17             Tributary of McCune Run, Bridge
    18             Replacement                                   150,000
    19         (14)  Canal Township, T-354, Bridge over
    20             Tributary of Warden Run, Bridge
    21             Replacement                                   150,000
    22         (15)  Canal Township, T-354, Bridge over
    23             Warden Run, Bridge Replacement                150,000
    24         (16)  Cornplanter Township, T-569, Bridge
    25             over Cherry Run, Bridge Replacement           242,000
    26         (17)  Cherrytree Township, T-649, Bridge
    27             over Prather Creek, Bridge Replacement        200,000
    28         (18)  Cherrytree Township, T-520, Bridge
    29             over Prather Creek, Bridge Replacement        200,000
    30         (19)  Cooperstown Borough, T-372, Bridge
    19990S0504B1471                 - 566 -

     1             over Lake Creek, Bridge Replacement           370,000
     2         (20)  Cornplanter Township, T-564, Bridge
     3             over Wykle Run, Bridge Replacement            417,000
     4         (21)  Cranberry Township, T-494, Bridge
     5             over Sage Run, Bridge Replacement             240,000
     6         (22)  Frenchcreek Township, T-318, Bridge
     7             over Little Sandy Creek, Bridge
     8             Replacement                                   300,000
     9         (23)  Frenchcreek Township, T-346, Bridge
    10             over Little Sandy Creek, Bridge
    11             Replacement                                   285,000
    12         (24)  Frenchcreek Township, T-304, Bridge
    13             over Little Sandy Creek, Bridge
    14             Replacement                                   302,000
    15         (25)  Frenchcreek Township, T-334, Bridge
    16             over Little Sandy Creek, Bridge
    17             Replacement                                   275,000
    18         (26)  Mineral Township, T-308, Bridge over
    19             Big Sandy Creek, Bridge Replacement           505,000
    20         (27)  Oil Creek Township, T-635, Bridge
    21             over Oil Creek, Bridge Replacement            840,000
    22         (28)  Polk Borough, Church Avenue Bridge
    23             over Sandy Creek, Bridge Replacement          600,000
    24         (29)  Rockland Township, T-522, Bridge over
    25             Mill Creek, Bridge Replacement                300,000
    26         (30)  Sugarcreek Borough, T-529, Bridge
    27             over Two Mile Run, Bridge Replacement         117,000
    28         (31)  Sugarcreek Borough, Sleepy Hollow
    29             Road Bridge over Tributary of Sugar
    30             Creek, Bridge Replacement                     135,000
    19990S0504B1471                 - 567 -

     1         (32)  Sugarcreek Township, T-529, Bridge
     2             over Sugar Creek, Bridge
     3             Rehabilitation                              9,360,000
     4     (b)  State Bridges
     5         (1)  SR 4001, SR 4001 over Two Mile Run
     6             West Branch, Sugarcreek Borough, Bridge
     7             Replacement                                   205,000
     8             (Base Construction Allocation -
     9             $150,000)
    10             (Land Allocation - $5,000)
    11             (Design and Contingencies - $50,000)
    12         (2)  SR 0227, SR 0227 over Cherry Run,
    13             Cornplanter Township, Bridge
    14             Replacement                                   280,000
    15             (Base Construction Allocation -
    16             $200,000)
    17             (Land Allocation - $20,000)
    18             (Design and Contingencies - $60,000)
    19         (3)  SR 0322, SR 0322 over Halls Run,
    20             Cranberry Township, Bridge Replacement      2,600,000
    21             (Base Construction Allocation -
    22             $2,000,000)
    23             (Land Allocation - $100,000)
    24             (Design and Contingencies - $500,000)
    25         (4)  SR 3009, SR 3009 over I-80, Scrubgrass
    26             Township, Bridge Replacement                  810,000
    27             (Base Construction Allocation -
    28             $700,000)
    29             (Land Allocation - $10,000)
    30             (Design and Contingencies - $100,000)
    19990S0504B1471                 - 568 -

     1         (5)  SR 3017, SR 3017 over Warden Run,
     2             Canal Township, Bridge Replacement            920,000
     3             (Base Construction Allocation -
     4             $800,000)
     5             (Land Allocation - $20,000)
     6             (Design and Contingencies - $100,000)
     7         (6)  SR 0038, SR 0038 over Pine Run,
     8             Richland Township, Bridge
     9             Rehabilitation                                110,000
    10             (Base Construction Allocation -
    11             $100,000)
    12             (Design and Contingencies - $10,000)
    13         (7)  SR 3025, SR 3025 over Hays Run, City
    14             of Oil City, Bridge Replacement               340,000
    15             (Base Construction Allocation -
    16             $300,000)
    17             (Land Allocation - $5,000)
    18             (Design and Contingencies - $35,000)
    19         (8)  SR 0062, Washington Crossing Bridge
    20             over French Creek and Conrail, City of
    21             Franklin, Bridge Painting                     920,000
    22             (Base Construction Allocation -
    23             $800,000)
    24             (Land Allocation - $40,000)
    25             (Design and Contingencies - $80,000)
    26         (9)  SR 0062, Sage Run Bridge No.4 over
    27             Sage Run, Cranberry Township, Bridge
    28             Replacement                                   660,000
    29             (Base Construction Allocation -
    30             $560,000)
    19990S0504B1471                 - 569 -

     1             (Land Allocation - $20,000)
     2             (Design and Contingencies - $80,000)
     3         (10)  SR 0062, Sage Run Bridge No.7 over
     4             Sage Run, Cranberry Township, Bridge
     5             Replacement                                   330,000
     6             (Base Construction Allocation -
     7             $250,000)
     8             (Land Allocation - $20,000)
     9             (Design and Contingencies - $60,000)
    10         (11)  SR 0322, 13th Street Bridge over
    11             French Creek, City of Franklin, Bridge
    12             Rehabilitation                              1,620,000
    13             (Base Construction Allocation -
    14             $1,500,000)
    15             (Land Allocation - $40,000)
    16             (Design and Contingencies - $80,000)
    17         (12)  SR 1004, Pithole Stone Arch Bridge
    18             over Pithole Creek, Cornplanter
    19             Township, Bridge Rehabilitation               400,000
    20             (Base Construction Allocation -
    21             $280,000)
    22             (Land Allocation - $20,000)
    23             (Design and Contingencies - $100,000)
    24         (13)  SR 4010, Twin Bridge over Sugar
    25             Creek, Sugarcreek Borough, Bridge
    26             Replacement                                 1,050,000
    27             (Base Construction Allocation -
    28             $900,000)
    29             (Land Allocation - $50,000)
    30             (Design and Contingencies - $100,000)
    19990S0504B1471                 - 570 -

     1         (14)  SR 1006, Pithole Creek Bridge No.4,
     2             Allegheny Township, Bridge Replacement        300,000
     3             (Base Construction Allocation -
     4             $200,000)
     5             (Land Allocation - $20,000)
     6             (Design and Contingencies - $80,000)
     7         (15)  SR 4022, Bridge over Porter Run, Plum
     8             Township, Bridge Replacement                  500,000
     9             (Base Construction Allocation -
    10             $400,000)
    11             (Land Allocation - $20,000)
    12             (Design and Contingencies - $80,000)
    13         (16)  SR 1006, Bridge over Pithole Creek,
    14             Allegheny Township, Bridge Replacement        300,000
    15         (17)  SR 4008, Bridge over McCune Run,
    16             Canal Township, Bridge Replacement            450,000
    17         (18)  SR 3017, Utica Road Bridge over
    18             Warden Run, Canal Township, Bridge
    19             Replacement                                   420,000
    20         (19)  SR 3005, Bridge over Scrubgrass
    21             Creek, Clinton Township, Bridge
    22             Replacement                                 1,250,000
    23         (20)  SR 0208, Bridge over I-80, Clinton
    24             Township, Bridge Replacement                5,000,000
    25         (21)  SR 0080, I-80 Bridge over Tributary
    26             of Scrubgrass Creek, Clintonville
    27             Borough, Bridge Replacement                   300,000
    28         (22)  SR 0008, Bridge over Oil Creek,
    29             Cornplanter Township, Bridge
    30             Rehabilitation                                746,000
    19990S0504B1471                 - 571 -

     1         (23)  SR 1004, Bridge over Oil Creek,
     2             Cornplanter Township, Bridge
     3             Replacement                                 2,500,000
     4         (24)  SR 1004, Bridge over Pitthole Creek,
     5             Cornplanter Township, Bridge
     6             Rehabilitation                                600,000
     7         (25)  SR 1006, 27th Street Bridge over
     8             Pithole Creek, Cornplanter Township,
     9             Bridge Replacement                            200,000
    10         (26)  SR 0227, Bridge No.3 over Cherry Run,
    11             Cornplanter Township, Bridge
    12             Replacement                                   500,000
    13         (27)  SR 0062, Bridge No.7 over Sage Run,
    14             Cranberry Township, Bridge Replacement        900,000
    15         (28)  SR 0062, Bridge No.5 over Sage Run,
    16             Cranberry Township, Bridge Replacement        500,000
    17         (29)  SR 0062, Bridge No.4 over Sage Run,
    18             Cranberry Township, Bridge Replacement        310,000
    19         (30)  SR 0322, Bridge over Halls Run,
    20             Cranberry Township, Bridge Replacement      1,400,000
    21         (31)  SR 0062, Sage Run Bridge No.1,
    22             Cranberry Township, Bridge Replacement        400,000
    23         (32)  SR 0062, Sage Run Bridge No.6,
    24             Cranberry Township, Bridge Replacement        400,000
    25         (33)  SR 0322, Bridge over French Creek,
    26             Franklin City, Bridge Rehabilitation        9,900,000
    27         (34)  SR 0322, Bridge over Allegheny River,
    28             Franklin City, Bridge Rehabilitation        9,620,000
    29         (35)  SR 0062, Bridge over Conrail and
    30             French Creek, Franklin City, Bridge
    19990S0504B1471                 - 572 -

     1             Painting                                      920,000
     2         (36)  SR 0008, Bridge over T-371, Irwin
     3             Township, Bridge Replacement                1,250,000
     4         (37)  SR 4003, Bridge over Wolf Run,
     5             Jackson Township, Bridge Replacement          200,000
     6         (38)  SR 3011, Bridge over South Sandy
     7             Creek, Mineral Township, Bridge
     8             Replacement                                   700,000
     9         (39)  SR 0428, Bridge over Prather Run,
    10             Oakland Township, Bridge Replacement          600,000
    11         (40)  SR 0428, Bridge over Sugar Creek,
    12             Oakland Township, Bridge Replacement          600,000
    13         (41)  SR 6008, Bridge over Oil Creek, Oil
    14             City, Bridge Replacement                    1,000,000
    15         (42)  SR 0427, Bridge No.1 over Sugar
    16             Creek, Plum Township, Bridge
    17             Replacement                                   300,000
    18         (43)  SR 0427, Bridge No.2 over Sugar
    19             Creek, Plum Township, Bridge
    20             Replacement                                   800,000
    21         (44)  SR 4022, Bridge over Tributary of
    22             Sugar Creek, Plum Township, Bridge
    23             Replacement                                   600,000
    24         (45)  SR 4022, Bridge over Porter Run, Plum
    25             Township, Bridge Replacement                  500,000
    26         (46)  SR 0080, I-80 Bridge over Little
    27             Scrubgrass Creek, Scrubgrass Township,
    28             Bridge Replacement                            600,000
    29         (47)  SR 4006, Bridge over Patchell Run,
    30             Sugarcreek Borough, Bridge Replacement        300,000
    19990S0504B1471                 - 573 -

     1         (48)  SR 4010, Bridge over Sugar Creek,
     2             Sugarcreek Borough, Bridge Replacement      1,300,000
     3         (49)  SR 0062, Bridge over Upper Two Mile
     4             Run, Sugarcreek Borough, Bridge
     5             Replacement                                   900,000
     6         (50)  SR 0322, Bridge over Sugar Creek,
     7             Sugarcreek Borough, Bridge Replacement      6,520,000
     8         (51)  SR 0427, Bridge over Sugar Creek,
     9             Sugarcreek Borough, Bridge Replacement        900,000
    10         (52)  SR 3023, Bridge over Mill Creek,
    11             Utica Borough, Bridge Replacement             400,000
    12         (53)  SR 0008, Bridge over T-380 and South
    13             Branch of Sandy Creek, Victory
    14             Township, Bridge Replacement                4,530,000
    15         (54)  SR 0008, Bridge over T-380 and North
    16             Branch of Sandy Creek, Victory
    17             Township, Bridge Replacement                4,530,000
    18         (55)  SR 1006, 17th Street Bridge over
    19             Allender Run, Cornplanter Township,
    20             Bridge Replacement                            300,000
    21  Section 66.  Warren County.
    22     (a)  Local Bridges
    23         (1)  Pine Grove Township, Main Street
    24             Bridge over Johnny Run, Bridge
    25             Replacement                                   560,000
    26             (Base Construction Allocation -
    27             $500,000)
    28             (Land Allocation - $10,000)
    29             (Design and Contingencies - $50,000)
    30     (b)  State Bridges
    19990S0504B1471                 - 574 -

     1         (1)  SR 0006, SR 0006 over Wintroth Run,
     2             Brokenstraw Township, Bridge
     3             Replacement                                   260,000
     4             (Base Construction Allocation -
     5             $180,000)
     6             (Land Allocation - $20,000)
     7             (Design and Contingencies - $60,000)
     8         (2)  SR 0006, SR 0006 over Six Mile Run,
     9             Mead Township, Bridge Replacement             320,000
    10             (Base Construction Allocation -
    11             $250,000)
    12             (Land Allocation - $10,000)
    13             (Design and Contingencies - $60,000)
    14         (3)  SR 0027, SR 0027 over Pine Creek,
    15             Southwest Township, Bridge Replacement        800,000
    16             (Base Construction Allocation -
    17             $580,000)
    18             (Land Allocation - $20,000)
    19             (Design and Contingencies - $200,000)
    20         (4)  SR 0027, SR 0027 over Hazeltine Hollow
    21             Run, Brokenstraw Township, Bridge
    22             Replacement                                   310,000
    23             (Base Construction Allocation -
    24             $210,000)
    25             (Land Allocation - $20,000)
    26             (Design and Contingencies - $80,000)
    27         (5)  SR 0062, SR 0062 over Bully Run,
    28             Watson Township, Bridge Replacement           300,000
    29             (Base Construction Allocation -
    30             $230,000)
    19990S0504B1471                 - 575 -

     1             (Land Allocation - $20,000)
     2             (Design and Contingencies - $50,000)
     3         (6)  SR 0957, SR 0957 over Little
     4             Brokenstraw Creek, Freehold Township,
     5             Bridge Replacement                            800,000
     6             (Base Construction Allocation -
     7             $620,000)
     8             (Land Allocation - $20,000)
     9             (Design and Contingencies - $160,000)
    10         (7)  SR 3009, SR 3009 over Tidioute Creek,
    11             Deerfield Township, Bridge Replacement        470,000
    12             (Base Construction Allocation -
    13             $400,000)
    14             (Land Allocation - $10,000)
    15             (Design and Contingencies - $60,000)
    16         (8)  SR 4013, SR 4013 over Mathews Run,
    17             Youngsville Borough, Bridge
    18             Replacement                                   430,000
    19             (Base Construction Allocation -
    20             $360,000)
    21             (Land Allocation - $10,000)
    22             (Design and Contingencies - $60,000)
    23         (9)  SR 4021, SR 4021 over Brands Run,
    24             Sugar Grove Borough, Bridge
    25             Replacement                                   240,000
    26             (Base Construction Allocation -
    27             $180,000)
    28             (Land Allocation - $20,000)
    29             (Design and Contingencies - $40,000)
    30         (10)  SR 0027, Bridge over Hazeltine Hollow
    19990S0504B1471                 - 576 -

     1             Run, Brokenstraw Township, Bridge
     2             Replacement                                   500,000
     3             (Base Construction Allocation -
     4             $450,000)
     5             (Design and Contingencies - $50,000)
     6         (11)  SR 0062, US 62, Bridge over Bully
     7             Run, Watson Township, Bridge
     8             Replacement                                   410,000
     9             (Base Construction Allocation -
    10             $370,000)
    11             (Design and Contingencies - $40,000)
    12         (12)  SR 3009, Tidioute Creek Road Bridge
    13             No.5 over Tidioute Creek, Triumph
    14             Township, Bridge Replacement                  290,000
    15             (Base Construction Allocation -
    16             $270,000)
    17             (Design and Contingencies - $20,000)
    18         (13)  SR 0027, Pittsfield Truss Bridge over
    19             Little Brokenstraw, Pittsfield
    20             Township, Bridge Replacement                1,040,000
    21             (Base Construction Allocation -
    22             $900,000)
    23             (Land Allocation - $40,000)
    24             (Design and Contingencies - $100,000)
    25         (14)  SR 3009, Tidioute Creek Road Bridge
    26             No.5 over Tidioute Creek, Triumph
    27             Township, Bridge Replacement                  300,000
    28             (Base Construction Allocation -
    29             $270,000)
    30             (Land Allocation - $10,000)
    19990S0504B1471                 - 577 -

     1             (Design and Contingencies - $20,000)
     2         (15)  SR 0006, Bridge over Ludlow Street,
     3             Warren Township, Bridge Replacement         1,600,000
     4             (Base Construction Allocation -
     5             $1,400,000)
     6             (Land Allocation - $50,000)
     7             (Design and Contingencies - $150,000)
     8         (16)  SR 0006, Bridge over Dutchmans Run,
     9             Mead Township, Bridge Replacement             700,000
    10             (Base Construction Allocation -
    11             $600,000)
    12             (Land Allocation - $20,000)
    13             (Design and Contingencies - $80,000)
    14         (17)  SR 0006, Bridge over Dutchmans Run,
    15             Mead Township, Bridge Replacement             800,000
    16             (Base Construction Allocation -
    17             $700,000)
    18             (Land Allocation - $20,000)
    19             (Design and Contingencies - $80,000)
    20         (18)  SR 0027, Bridge over Conrail,
    21             Pittsfield Township, Bridge
    22             Replacement                                 1,920,000
    23             (Base Construction Allocation -
    24             $1,700,000)
    25             (Land Allocation - $20,000)
    26             (Design and Contingencies - $200,000)
    27         (19)  SR 0027, Bridge over Teelick Run,
    28             Brokenstraw Township, Bridge
    29             Replacement                                   200,000
    30             (Base Construction Allocation -
    19990S0504B1471                 - 578 -

     1             $100,000)
     2             (Land Allocation - $20,000)
     3             (Design and Contingencies - $80,000)
     4         (20)  SR 0027, Bridge over Mathews Run,
     5             Sugar Grove Township, Bridge
     6             Replacement                                   400,000
     7             (Base Construction Allocation -
     8             $300,000)
     9             (Land Allocation - $20,000)
    10             (Design and Contingencies - $80,000)
    11         (21)  SR 0059, Bridge over Morrison Run,
    12             Mead Township, Bridge Replacement             400,000
    13             (Base Construction Allocation -
    14             $300,000)
    15             (Land Allocation - $20,000)
    16             (Design and Contingencies - $80,000)
    17         (22)  SR 0059, Bridge over Brown Run, Mead
    18             Township, Bridge Replacement                  400,000
    19             (Base Construction Allocation -
    20             $300,000)
    21             (Land Allocation - $20,000)
    22             (Design and Contingencies - $80,000)
    23         (23)  SR 0059, Bridge over Ward Run, Mead
    24             Township, Bridge Replacement                  300,000
    25             (Base Construction Allocation -
    26             $200,000)
    27             (Land Allocation - $20,000)
    28             (Design and Contingencies - $80,000)
    29         (24)  SR 0059, Bridge over Kinzua Creek,
    30             Mead Township, Bridge Replacement          22,720,000
    19990S0504B1471                 - 579 -

     1             (Base Construction Allocation -
     2             $20,400,000)
     3             (Land Allocation - $20,000)
     4             (Design and Contingencies - $2,300,000)
     5         (25)  SR 0948, Bridge over Tionesta Creek,
     6             South Bridge, Sheffield Township,
     7             Bridge Replacement                            900,000
     8             (Base Construction Allocation -
     9             $800,000)
    10             (Land Allocation - $20,000)
    11             (Design and Contingencies - $80,000)
    12         (26)  SR 0957, Bridge over Brokenstraw
    13             Creek, Columbus Township, Bridge
    14             Replacement                                 1,120,000
    15             (Base Construction Allocation -
    16             $1,000,000)
    17             (Land Allocation - $20,000)
    18             (Design and Contingencies - $100,000)
    19         (27)  SR 0957, Bridge over Kanetone Creek,
    20             Farmington Township, Bridge
    21             Replacement                                   300,000
    22             (Base Construction Allocation -
    23             $200,000)
    24             (Land Allocation - $20,000)
    25             (Design and Contingencies - $80,000)
    26         (28)  SR 1011, Conewango Avenue Bridge,
    27             Glade Township, Bridge Rehabilitation         700,000
    28             (Base Construction Allocation -
    29             $600,000)
    30             (Land Allocation - $20,000)
    19990S0504B1471                 - 580 -

     1             (Design and Contingencies - $80,000)
     2         (29)  SR 1030, Bridge over Scotts Run,
     3             Conewango Township, Bridge Replacement        400,000
     4             (Base Construction Allocation -
     5             $300,000)
     6             (Land Allocation - $20,000)
     7             (Design and Contingencies - $80,000)
     8         (30)  SR 2002, Bridge over Tionesta Creek,
     9             Sheffield Township, Bridge Replacement        900,000
    10             (Base Construction Allocation -
    11             $800,000)
    12             (Land Allocation - $20,000)
    13             (Design and Contingencies - $80,000)
    14         (31)  SR 2004, Bridge over Two Mile Run,
    15             Sheffield Township, Bridge Replacement        500,000
    16             (Base Construction Allocation -
    17             $400,000)
    18             (Land Allocation - $20,000)
    19             (Design and Contingencies - $80,000)
    20         (32)  SR 3004, Bridge over Caldwell Creek,
    21             Southwest Township, Bridge Replacement        600,000
    22             (Base Construction Allocation -
    23             $500,000)
    24             (Land Allocation - $20,000)
    25             (Design and Contingencies - $80,000)
    26         (33)  SR 3016, Bridge over Mead Run,
    27             Brokenstraw Township, Bridge
    28             Replacement                                   500,000
    29             (Base Construction Allocation -
    30             $400,000)
    19990S0504B1471                 - 581 -

     1             (Land Allocation - $20,000)
     2             (Design and Contingencies - $80,000)
     3         (34)  SR 4007, Bridge over Coffee Creek,
     4             Columbus Township, Bridge Replacement         300,000
     5             (Base Construction Allocation -
     6             $200,000)
     7             (Land Allocation - $20,000)
     8             (Design and Contingencies - $80,000)
     9         (35)  SR 4023, Bridge over Brokenstraw
    10             Creek, Columbus Township, Bridge
    11             Replacement                                 1,220,000
    12             (Base Construction Allocation -
    13             $1,100,000)
    14             (Land Allocation - $20,000)
    15             (Design and Contingencies - $100,000)
    16         (36)  SR 6006, Conewango Creek Bridge over
    17             Pennsylvania Avenue, Warren Township,
    18             Bridge Replacement                          3,820,000
    19             (Base Construction Allocation -
    20             $3,400,000)
    21             (Land Allocation - $20,000)
    22             (Design and Contingencies - $400,000)
    23         (37)  Main Street Bridge over Johnny Run,
    24             Pine Grove Township, Bridge
    25             Replacement                                   560,000
    26             (Base Construction Allocation -
    27             $500,000)
    28             (Land Allocation - $10,000)
    29             (Design and Contingencies - $50,000)
    30  Section 67.  Washington County.
    19990S0504B1471                 - 582 -

     1     (a)  Local Bridges
     2         (1)  Burgettstown Borough, Raccoon Bridge
     3             No.23 over Raccoon Creek, Bridge
     4             Rehabilitation                                433,000
     5             (Base Construction Allocation -
     6             $313,000)
     7             (Land Allocation - $20,000)
     8             (Design and Contingencies - $100,000)
     9         (2)  Chartiers Township, Allison Hollow
    10             Road, One-Lane Bridge, Bridge
    11             Replacement                                   195,000
    12             (Base Construction Allocation -
    13             $150,000)
    14             (Land Allocation - $5,000)
    15             (Design and Contingencies - $40,000)
    16         (3)  Chartiers Township, Allison Hollow
    17             Road, One-Lane Bridge, Bridge
    18             Replacement                                   195,000
    19             (Base Construction Allocation -
    20             $150,000)
    21             (Land Allocation - $5,000)
    22             (Design and Contingencies - $40,000)
    23         (4)  Chartiers Township, McGovern Road
    24             Bridge, Bridge Replacement                    145,000
    25             (Base Construction Allocation -
    26             $100,000)
    27             (Land Allocation - $5,000)
    28             (Design and Contingencies - $40,000)
    29         (5)  North Strabane Township, T-643, Galley
    30             Road Bridge over Little Chartiers
    19990S0504B1471                 - 583 -

     1             Creek, Bridge Replacement                     570,000
     2             (Base Construction Allocation -
     3             $450,000)
     4             (Land Allocation - $20,000)
     5             (Design and Contingencies - $100,000)
     6         (6)  Donegal Township, T-541, Lindsay
     7             Bridge over Buck Run, Bridge
     8             Replacement                                   285,000
     9             (Base Construction Allocation -
    10             $255,000)
    11             (Design and Contingencies - $30,000)
    12         (7)  Donegal Township, T-423, Mays Bridge
    13             over Middle Wheeling Creek, Bridge
    14             Replacement                                   245,000
    15             (Base Construction Allocation -
    16             $215,000)
    17             (Design and Contingencies - $30,000)
    18         (8)  Independence Township, T-649, Cummins
    19             Bridge over Sugar Camp Run, Bridge
    20             Replacement                                   330,000
    21             (Base Construction Allocation -
    22             $300,000)
    23             (Design and Contingencies - $30,000)
    24         (9)  Mount Pleasant Township, T-749, Sabo
    25             Road over Westland Run, Bridge
    26             Replacement                                    25,000
    27             (Base Construction Allocation -
    28             $20,000)
    29             (Design and Contingencies - $5,000)
    30         (10)  Mount Pleasant Township, T-606,
    19990S0504B1471                 - 584 -

     1             Primrose Road over Millers Run, Bridge
     2             Replacement                                    25,000
     3             (Base Construction Allocation -
     4             $20,000)
     5             (Design and Contingencies - $5,000)
     6         (11)  Mount Pleasant Township, T-493,
     7             Meriage Street over Robinson Run
     8             Tributary, Bridge Replacement                  25,000
     9             (Base Construction Allocation -
    10             $20,000)
    11             (Design and Contingencies - $5,000)
    12         (12)  North Bethlehem Township, T-445,
    13             Dague Bridge over Pigeon Creek, Bridge
    14             Replacement                                   250,000
    15             (Base Construction Allocation -
    16             $220,000)
    17             (Design and Contingencies - $30,000)
    18         (13)  North Franklin Township, T-526, Cario
    19             Drive over Unnamed Tributary of Catfish
    20             Creek, Bridge Replacement                      46,000
    21             (Base Construction Allocation -
    22             $42,000)
    23             (Design and Contingencies - $4,000)
    24         (14)  Nottingham Township, T-782, Sundust
    25             Road Culvert, 35 Feet North of
    26             Intersection with SR 1059, Bridge
    27             Replacement                                   101,000
    28             (Base Construction Allocation -
    29             $91,000)
    30             (Design and Contingencies - $10,000)
    19990S0504B1471                 - 585 -

     1         (15)  Nottingham Township, T-828, Barr
     2             Bridge over Mingo Creek, Bridge
     3             Replacement                                   350,000
     4             (Base Construction Allocation -
     5             $310,000)
     6             (Design and Contingencies - $40,000)
     7         (16)  Robinson Township, T-500, Chamberlain
     8             Bridge over Chamberlain Run, Bridge
     9             Replacement                                   285,000
    10             (Base Construction Allocation -
    11             $255,000)
    12             (Design and Contingencies - $30,000)
    13         (17)  Smith Township, T-843, Dunbar Bridge
    14             over Raccoon Creek, Bridge Replacement        285,000
    15             (Base Construction Allocation -
    16             $255,000)
    17             (Design and Contingencies - $30,000)
    18         (18)  City of Washington, Hanna Street
    19             Bridge over Catfish Creek, Bridge
    20             Replacement                                    40,000
    21             (Base Construction Allocation -
    22             $30,000)
    23             (Design and Contingencies - $10,000)
    24         (19)  City of Washington, Rosewood Avenue
    25             Bridge over Catfish Creek, Bridge
    26             Replacement                                    40,000
    27             (Base Construction Allocation -
    28             $30,000)
    29             (Design and Contingencies - $10,000)
    30         (20)  West Pike Run Township, T-840, Suzy
    19990S0504B1471                 - 586 -

     1             Lane over Pike Run Creek, Bridge
     2             Replacement                                   230,000
     3             (Base Construction Allocation -
     4             $210,000)
     5             (Design and Contingencies - $20,000)
     6         (21)  California Borough, Daisytown Bridge
     7             over Pike Run, Bridge Replacement             925,000
     8             (Base Construction Allocation -
     9             $700,000)
    10             (Land Allocation - $50,000)
    11             (Design and Contingencies - $175,000)
    12         (22)  Coal Center Borough, Water Street
    13             Bridge over Pike Run, Bridge
    14             Replacement                                 1,588,000
    15             (Base Construction Allocation -
    16             $1,288,000)
    17             (Land Allocation - $50,000)
    18             (Design and Contingencies - $250,000)
    19         (23)  West Pike Run Township, T-948 over
    20             Pike Run, Bridge Replacement                1,075,000
    21             (Base Construction Allocation -
    22             $850,000)
    23             (Land Allocation - $50,0000)
    24             (Design and Contingencies - $175,000)
    25         (24)  Midway Borough, North Avenue over
    26             Robinson Run Creek, Bridge Replacement         95,000
    27             (Base Construction Allocation -
    28             $55,000)
    29             (Land Allocation - $20,000)
    30             (Design and Contingencies - $20,000)
    19990S0504B1471                 - 587 -

     1         (25)  Canonsburg Borough, Adams Street over
     2             Brush Run, Bridge Replacement                 176,000
     3             (Base Construction Allocation -
     4             $150,000)
     5             (Land Allocation - $1,000)
     6             (Design and Contingencies - $25,000)
     7         (26)  East Finley Township, T-375, County
     8             Bridge No.32 over Templeton Fork,
     9             Bridge Replacement                            355,000
    10             (Base Construction Allocation -
    11             $300,000)
    12             (Land Allocation - $5,000)
    13             (Design and Contingencies - $50,000)
    14         (27)  North Franklin Township, Construct
    15             New Bridges Along New Local Road
    16             Connecting SR 3013 and SR 0018, New
    17             Bridge Construction                         1,168,000
    18             (Base Construction Allocation -
    19             $928,000)
    20             (Land Allocation - $100,000)
    21             (Design and Contingencies - $140,000)
    22         (28)  Peters Township, Bebout Road Bridge,
    23             Bridge Rehabilitation                         365,000
    24             (Base Construction Allocation -
    25             $365,000)
    26         (29)  Blaine Township, Bridge No.23 over
    27             Buffalo Creek, Bridge Replacement             315,000
    28             (Base Construction Allocation -
    29             $210,000)
    30             (Land Allocation - $5,000)
    19990S0504B1471                 - 588 -

     1             (Design and Contingencies - $100,000)
     2         (30)  Buffalo Township, Bridge No.38 over
     3             Buffalo Creek, Bridge Replacement             315,000
     4             (Base Construction Allocation -
     5             $210,000)
     6             (Land Allocation - $5,000)
     7             (Design and Contingencies - $100,000)
     8         (31)  Donegal Township, Bridge No.4 over
     9             Middle Wheeling Creek, Bridge
    10             Replacement                                   315,000
    11             (Base Construction Allocation -
    12             $210,000)
    13             (Land Allocation - $5,000)
    14             (Design and Contingencies - $100,000)
    15         (32)  Marianna Borough, Bridge No.3 over
    16             Patterson Run, Bridge Replacement             710,000
    17             (Base Construction Allocation -
    18             $500,000)
    19             (Land Allocation - $10,000)
    20             (Design and Contingencies - $200,000)
    21         (33)  Nottingham Township, Bridge No.11
    22             over Mingo Creek, Bridge Replacement          325,000
    23             (Base Construction Allocation -
    24             $220,000)
    25             (Land Allocation - $5,000)
    26             (Design and Contingencies - $100,000)
    27         (34)  West Bethlehem Township, Grable Road
    28             Culvert, Bridge Replacement                   400,000
    29             (Base Construction Allocation -
    30             $285,000)
    19990S0504B1471                 - 589 -

     1             (Land Allocation - $15,000)
     2             (Design and Contingencies - $100,000)
     3         (35)  West Bethlehem Township, Dutch Glory
     4             Road Bridge, Bridge Replacement               350,000
     5             (Base Construction Allocation -
     6             $245,000)
     7             (Land Allocation - $5,000)
     8             (Design and Contingencies - $100,000)
     9         (36)  West Pike Run Township, Bridge No.18
    10             over Pike Run, Bridge Replacement             305,000
    11             (Base Construction Allocation -
    12             $200,000)
    13             (Land Allocation - $5,000)
    14             (Design and Contingencies - $100,000)
    15         (37)  MARIANNA BOROUGH, T-327, BRIDGE OVER                 <--
    16             PATTERSON RUN, BRIDGE REPLACEMENT             355,000
    17             (BASE CONSTRUCTION ALLOCATION -
    18             $250,000)
    19             (LAND ALLOCATION - $5,000)
    20             (DESIGN AND CONTINGENCIES - $100,000)
    21         (38)  ROBINSON AND CECIL TOWNSHIPS,
    22             MCDONALD TRESTLE BRIDGE OVER ROBINSON
    23             RUN, BRIDGE REPLACEMENT                       392,000
    24             (BASE CONSTRUCTION ALLOCATION -
    25             $275,000)
    26             (DESIGN AND CONTINGENCIES - $117,000)
    27         (39)  CECIL TOWNSHIP, MUSE-BISHOP ROAD
    28             BRIDGE, BRIDGE REPLACEMENT                    525,000
    29             (BASE CONSTRUCTION ALLOCATION -
    30             $368,000)
    19990S0504B1471                 - 590 -

     1             (DESIGN AND CONTINGENCIES - $157,000)
     2         (40)  FALLOWFIELD TOWNSHIP, T-892, BRIDGE
     3             ON FOX STOP ROAD, BRIDGE REPLACEMENT          400,000
     4             (BASE CONSTRUCTION ALLOCATION -
     5             $250,000)
     6             (LAND ALLOCATION - $25,000)
     7             (DESIGN AND CONTINGENCIES - $125,000)
     8         (41)  FALLOWFIELD TOWNSHIP, T-882, BRIDGE
     9             ON COOPER ROAD, BRIDGE REPLACEMENT            400,000
    10             (BASE CONSTRUCTION ALLOCATION -
    11             $250,000)
    12             (LAND ALLOCATION - $25,000)
    13             (DESIGN AND CONTINGENCIES - $125,000)
    14         (42)  CITY OF MONONGAHELA, CHESS STREET
    15             BRIDGE NO.1 OVER DRY RUN, BRIDGE
    16             REPLACEMENT                                   415,000
    17             (BASE CONSTRUCTION ALLOCATION -
    18             $250,000)
    19             (LAND ALLOCATION - $5,000)
    20             (DESIGN AND CONTINGENCIES - $160,000)
    21         (43)  CECIL TOWNSHIP, HENDERSONVILLE ROAD
    22             BRIDGE OVER MONTOUR TRAIL, NEW BRIDGE
    23             CONSTRUCTION                                5,500,000
    24             (BASE CONSTRUCTION ALLOCATION -
    25             $5,000,000)
    26             (DESIGN AND CONTINGENCIES - $500,000)
    27         (44)  CECIL TOWNSHIP, TR 776, CREEDMORE
    28             ROAD BRIDGE, BRIDGE REPLACEMENT                65,000
    29         (45)  CHARTIERS TOWNSHIP, PAXTON BRIDGE
    30             NO.40 OVER CHARTIERS CREEK, BRIDGE
    19990S0504B1471                 - 591 -

     1             REPLACEMENT                                   400,000
     2         (46)  CROSS CREEK TOWNSHIP, WILSON-LAWTON
     3             BRIDGE NO.28 OVER CROSS CREEK, BRIDGE
     4             REPLACEMENT                                   280,000
     5         (47)  HANOVER TOWNSHIP, KING BRIDGE NO.7
     6             OVER KINGS CREEK, BRIDGE REPLACEMENT          280,000
     7         (48)  CECIL TOWNSHIP, SCOTT BRIDGE NO.7
     8             OVER MILLERS RUN, BRIDGE REPLACEMENT          330,000
     9         (49)  ROBINSON TOWNSHIP, ELLIOT BRIDGE
    10             NO.12 OVER RACCOON CREEK, BRIDGE
    11             REPLACEMENT                                   280,000
    12         (50)  SMITH TOWNSHIP, KEYS BRIDGE NO.28
    13             OVER RACCOON CREEK, BRIDGE REPLACEMENT        350,000
    14         (51)  SMITH TOWNSHIP, CHERRY VALLEY BRIDGE
    15             NO.30 OVER RACCOON CREEK, BRIDGE
    16             REPLACEMENT                                   350,000
    17         (52)  INDEPENDENCE TOWNSHIP, APPLE BRIDGE
    18             NO.1 OVER SUGAR CAMP RUN, BRIDGE
    19             REPLACEMENT                                   280,000
    20         (53)  AMWELL TOWNSHIP, CONDIT BRIDGE NO.55
    21             OVER TEN MILE CREEK, BRIDGE
    22             REPLACEMENT                                   280,000
    23         (54)  AMWELL TOWNSHIP, CRAFT BRIDGE NO.66
    24             OVER TEN MILE CREEK, BRIDGE
    25             REPLACEMENT                                   280,000
    26         (55)  CENTERVILLE BOROUGH, TWO MILE BRIDGE
    27             NO.4 OVER TWO MILE RUN, BRIDGE
    28             REPLACEMENT                                   200,000
    29         (56)  FALLOWFIELD TOWNSHIP, T-892, FOX STOP
    30             ROAD CROSSING STRUCTURE OVER THE
    19990S0504B1471                 - 592 -

     1             WHEELING AND LAKE ERIE RAILWAY CO.,
     2             BRIDGE REPLACEMENT                            715,000
     3             (BASE CONSTRUCTION ALLOCATION -
     4             $650,000)
     5             (DESIGN AND CONTINGENCIES - $65,000)
     6     (b)  State Bridges
     7         (1)  SR 0018, Bridge over Abandoned
     8             Railroad, City of Washington, Bridge
     9             Replacement                                   650,000
    10             (Base Construction Allocation -
    11             $500,000)
    12             (Land Allocation - $25,000)
    13             (Design and Contingencies - $125,000)
    14         (2)  SR 0019, Bridge over Chartiers Creek,
    15             North Strabane and Peters Townships,
    16             Bridge Painting                               161,000
    17             (Base Construction Allocation -
    18             $156,000)
    19             (Design and Contingencies - $5,000)
    20         (3)  SR 0070, I-70 Westbound Bridge over SR
    21             3009, Buffalo Township, Bridge
    22             Painting                                      148,000
    23             (Base Construction Allocation -
    24             $143,000)
    25             (Design and Contingencies - $5,000)
    26         (4)  SR 0070, I-70 Eastbound Bridge over SR
    27             3009, Buffalo Township, Bridge
    28             Painting                                      163,000
    29             (Base Construction Allocation -
    30             $158,000)
    19990S0504B1471                 - 593 -

     1             (Design and Contingencies - $5,000)
     2         (5)  SR 0070, I-70 Bridge over 8th Street,
     3             Donegal Township, Bridge Replacement        2,486,000
     4             (Base Construction Allocation -
     5             $2,211,000)
     6             (Land Allocation - $25,000)
     7             (Design and Contingencies - $250,000)
     8         (6)  SR 0070, I-70 Bridge over Turnback
     9             Road, South Strabane Township, Bridge
    10             Rehabilitation                                990,000
    11             (Base Construction Allocation -
    12             $750,000)
    13             (Land Allocation - $40,000)
    14             (Design and Contingencies - $200,000)
    15         (7)  SR 0070, I-70 Bridge over SR 0519,
    16             Somerset Township, Bridge
    17             Rehabilitation                              2,000,000
    18             (Base Construction Allocation -
    19             $1,720,000)
    20             (Land Allocation - $40,000)
    21             (Design and Contingencies - $240,000)
    22         (8)  SR 0070, I-70 Bridge over SR 2017,
    23             Somerset Township, Bridge
    24             Rehabilitation                              1,105,000
    25             (Base Construction Allocation -
    26             $865,000)
    27             (Land Allocation - $40,000)
    28             (Design and Contingencies - $200,000)
    29         (9)  SR 0088, Charleroi Bridge over Maple
    30             Creek, Charleroi and Speers Boroughs,
    19990S0504B1471                 - 594 -

     1             Bridge Replacement                            725,000
     2             (Base Construction Allocation -
     3             $500,000)
     4             (Land Allocation - $25,000)
     5             (Design and Contingencies - $200,000)
     6         (10)  SR 0088, Bridge over Peters Creek,
     7             Finleyville Borough, Bridge Painting           65,000
     8             (Base Construction Allocation -
     9             $65,000)
    10         (11)  SR 0917, Pigeon Creek Bridge over
    11             Branch of Pigeon Creek, Bentleyville
    12             Borough, Bridge Replacement                   570,000
    13             (Base Construction Allocation -
    14             $370,000)
    15             (Land Allocation - $25,000)
    16             (Design and Contingencies - $175,000)
    17         (12)  SR 1005, Bridge over Millers Run,
    18             Cecil Township, Bridge Painting                75,000
    19             (Base Construction Allocation -
    20             $75,000)
    21         (13)  SR 1022, Donora Webster Bridge over
    22             Monongahela River and Conrail, Donora
    23             Borough, Bridge Replacement                20,000,000
    24             (Base Construction Allocation -
    25             $15,000,000)
    26             (Land Allocation - $3,000,000)
    27             (Design and Contingencies - $2,000,000)
    28         (14)  SR 1077, Donora-Monessen Bridge over
    29             Monongahela River, PA 837 and 906 and
    30             Railroad, Donora Borough, Bridge
    19990S0504B1471                 - 595 -

     1             Painting                                    1,000,000
     2             (Base Construction Allocation -
     3             $1,000,000)
     4         (15)  SR 2005, Sowers Run Bridge over
     5             Sowers Run, Amwell Township, Bridge
     6             Replacement                                   435,000
     7             (Base Construction Allocation -
     8             $235,000)
     9             (Land Allocation - $25,000)
    10             (Design and Contingencies - $175,000)
    11         (16)  SR 2011, Bridge over Branch of Little
    12             Tenmile Creek, West Bethlehem Township,
    13             Bridge Replacement                            460,000
    14             (Base Construction Allocation -
    15             $260,000)
    16             (Land Allocation - $25,000)
    17             (Design and Contingencies - $175,000)
    18         (17)  SR 2030, Gorby's Bridge II over Gorby
    19             Run, California Borough, Bridge
    20             Rehabilitation                                300,000
    21             (Base Construction Allocation -
    22             $300,000)
    23         (18)  SR 2037, Maple Creek Bridge over
    24             Branch of Maple Creek, Fallowfield
    25             Township, Bridge Replacement                  486,000
    26             (Base Construction Allocation -
    27             $286,000)
    28             (Land Allocation - $25,000)
    29             (Design and Contingencies - $175,000)
    30         (19)  SR 3009, Buffalo Arch Bridge over
    19990S0504B1471                 - 596 -

     1             Branch of Buffalo Creek and Railroad,
     2             Buffalo Township, Bridge Replacement          535,000
     3             (Base Construction Allocation -
     4             $300,000)
     5             (Land Allocation - $10,000)
     6             (Design and Contingencies - $225,000)
     7         (20)  SR 4015, Bridge over Cherry Run,
     8             Mount Pleasant Township, Bridge
     9             Painting                                       53,000
    10             (Base Construction Allocation -
    11             $51,000)
    12             (Design and Contingencies - $2,000)
    13         (21)  SR 4022, Chartiers Creek Bridge No.2
    14             over Branch of Chartiers Creek, Canton
    15             Township, Bridge Replacement                  415,000
    16             (Base Construction Allocation -
    17             $215,000)
    18             (Land Allocation - $25,000)
    19             (Design and Contingencies - $175,000)
    20         (22)  SR 4022, Chartiers Creek Bridge No.1
    21             over Branch of Chartiers Creek, Canton
    22             Township, Bridge Replacement                  405,000
    23             (Base Construction Allocation -
    24             $205,000)
    25             (Land Allocation - $25,000)
    26             (Design and Contingencies - $175,000)
    27         (23)  SR 2034, SR 2034 over Branch of Pike
    28             Run, West Pike Run Township, Bridge
    29             Replacement                                   438,000
    30             (Base Construction Allocation -
    19990S0504B1471                 - 597 -

     1             $313,000)
     2             (Land Allocation - $25,000)
     3             (Design and Contingencies - $100,000)
     4         (24)  SR 2079, SR 2079 over Pike Run, West
     5             Pike Run Township, Bridge Replacement         988,000
     6             (Base Construction Allocation -
     7             $788,000)
     8             (Land Allocation - $50,000)
     9             (Design and Contingencies - $150,000)
    10         (25)  SR 2030, Bridge No.1 over Gorby Run,
    11             California Borough, Bridge Replacement        430,000
    12             (Base Construction Allocation -
    13             $330,000)
    14             (Design and Contingencies - $100,000)
    15         (26)  SR 1077, Donora-Monessen Bridge over
    16             Monongahela River, Donora Borough,
    17             Bridge Rehabilitation                       2,000,000
    18             (Base Construction Allocation -
    19             $1,980,000)
    20             (Design and Contingencies - $20,000)
    21         (27)  SR 0070, I-70 Bridge at SR 0481
    22             Interchange, Mon City Exit, Fallowfield
    23             Township, Bridge Replacement                  580,000
    24             (Base Construction Allocation -
    25             $280,000)
    26             (Land Allocation - $100,000)
    27             (Design and Contingencies - $200,000)
    28         (28)  SR 0018, JOHN BRUNNER MEMORIAL BYPASS                <--
    29             BRIDGE OVER FORK OF RACCOON CREEK,
    30             BRIDGE REPLACEMENT/RECONSTRUCTION           1,250,000
    19990S0504B1471                 - 598 -

     1         (29)  SR 4018, MEADOWCRAFT VILLAGE BRIDGE
     2             OVER CROSS CREEK, BRIDGE
     3             REPLACEMENT/RECONSTRUCTION                    750,000
     4         (30)  SR 2011, BRIDGE AT INTERSECTION WITH
     5             LAUREL RIDGE ROAD, WEST BETHLEHEM
     6             TOWNSHIP, BRIDGE REPLACEMENT                  575,000
     7             (BASE CONSTRUCTION ALLOCATION -
     8             $350,000)
     9             (LAND ALLOCATION - $25,000)
    10             (DESIGN AND CONTINGENCIES - $200,000)
    11  Section 68.  Wayne County.
    12     (a)  Local Bridges
    13         (1)  Honesdale Borough, Old Willow Avenue,
    14             Bridge over Corley Brook at
    15             Intersection of TR 6, Bridge
    16             Replacement                                   410,000
    17             (Base Construction Allocation -
    18             $350,000)
    19             (Land Allocation - $10,000)
    20             (Design and Contingencies - $50,000)
    21     (b)  State Bridges
    22         (1)  SR 0371, Cochecton Bridge No.6 over
    23             Delaware River, Damascus Township,
    24             Bridge Rehabilitation                       1,050,000
    25             (Base Construction Allocation -
    26             $950,000)
    27             (Design and Contingencies - $100,000)
    28         (2)  SR 0380, I-380 Bridge over Lehigh
    29             River, Lehigh Township, Bridge
    30             Rehabilitation                                284,000
    19990S0504B1471                 - 599 -

     1             (Base Construction Allocation -
     2             $244,000)
     3             (Design and Contingencies - $40,000)
     4         (3)  SR 4009, Quarry Bridge over Dyberry
     5             Creek, Dyberry Township, Bridge
     6             Replacement                                   660,000
     7             (Base Construction Allocation -
     8             $500,000)
     9             (Land Allocation - $10,000)
    10             (Design and Contingencies - $150,000)
    11         (4)  SR 0371, Bridge No.6, Damascus
    12             Township, Bridge Painting                   2,200,000
    13             (Base Construction Allocation -
    14             $2,000,000)
    15             (Design and Contingencies - $200,000)
    16         (5)  SR 1020, Bridge No.7 over Delaware
    17             River, Damascus Township, Bridge
    18             Painting                                    3,300,000
    19             (Base Construction Allocation -
    20             $3,000,000)
    21             (Design and Contingencies - $300,000)
    22         (6)  SR 1004, Bridge over Outlet of Beach
    23             Lake, Intersection of SR 1011, Berlin
    24             Township, Bridge Replacement                  345,000
    25             (Base Construction Allocation -
    26             $265,000)
    27             (Land Allocation - $10,000)
    28             (Design and Contingencies - $70,000)
    29         (7)  SR 3028, Bridge over TR 191, East of
    30             SR 3031, Cherry Ridge Township, Bridge
    19990S0504B1471                 - 600 -

     1             Replacement                                   450,000
     2             (Base Construction Allocation -
     3             $350,000)
     4             (Land Allocation - $10,000)
     5             (Design and Contingencies - $90,000)
     6         (8)  State Bridges, Countywide Bridge Zone
     7             Painting, Bridge Painting                     370,000
     8             (Base Construction Allocation -
     9             $350,000)
    10             (Land Allocation - $10,000)
    11             (Design and Contingencies - $10,000)
    12         (9)  SR 1004, SR 1004 over Outlet of Beach
    13             Lake, Berlin Township, Bridge
    14             Replacement                                   260,000
    15             (Base Construction Allocation -
    16             $220,000)
    17             (Land Allocation - $10,000)
    18             (Design and Contingencies - $30,000)
    19         (10)  SR 3028, SR 3028 over TR 191, Cherry
    20             Ridge Township, Bridge Replacement            400,000
    21             (Base Construction Allocation -
    22             $340,000)
    23             (Land Allocation - $10,000)
    24             (Design and Contingencies - $50,000)
    25         (11)  SR 0371, Bridge No.1 over Dyberry
    26             Creek at Junction of SR 1023, Lebanon
    27             Township, Bridge Replacement                  400,000
    28             (Base Construction Allocation -
    29             $340,000)
    30             (Land Allocation - $10,000)
    19990S0504B1471                 - 601 -

     1             (Design and Contingencies - $50,000)
     2         (12)  SR 0371, Bridge No.5 over Beaver Dam
     3             Creek, 0.1 Mile West of SR 1031,
     4             Damascus Township, Bridge Replacement         470,000
     5             (Base Construction Allocation -
     6             $400,000)
     7             (Land Allocation - $10,000)
     8             (Design and Contingencies - $60,000)
     9         (13)  SR 3006, Bridge No.3 over Ariel
    10             Creek, 0.6 Mile North of SR 3008, Salem
    11             Township, Bridge Replacement                  470,000
    12             (Base Construction Allocation -
    13             $400,000)
    14             (Land Allocation - $10,000)
    15             (Design and Contingencies - $60,000)
    16         (14)  SR 4014, Bridge No.4 over Balls
    17             Creek, 0.5 Mile East of SR 4037, Scott
    18             Township, Bridge Replacement                  380,000
    19             (Base Construction Allocation -
    20             $320,000)
    21             (Land Allocation - $10,000)
    22             (Design and Contingencies - $50,000)
    23         (15)  SR 0348, Bridge over Jones Creek, 0.1
    24             Mile West of SR 3019, Salem Township,
    25             Bridge Replacement                            470,000
    26             (Base Construction Allocation -
    27             $400,000)
    28             (Land Allocation - $10,000)
    29             (Design and Contingencies - $60,000)
    30         (16)  SR 4043, Bridge over Branch of Oquaga
    19990S0504B1471                 - 602 -

     1             Creek, 1.5 Miles West of SR 4037, Scott
     2             Township, Bridge Replacement                  240,000
     3             (Base Construction Allocation -
     4             $200,000)
     5             (Land Allocation - $10,000)
     6             (Design and Contingencies - $30,000)
     7         (17)  SR 1007, Bridge over Branch of Boyd's
     8             Creek, 0.5 Mile East of SR 1019,
     9             Damascus Township, Bridge Replacement         310,000
    10             (Base Construction Allocation -
    11             $260,000)
    12             (Land Allocation - $10,000)
    13             (Design and Contingencies - $40,000)
    14         (18)  SR 0006, Lackawaxen River Bridge over
    15             Lackawaxen River, Honesdale Borough,
    16             Bridge Rehabilitation                         260,000
    17             (Base Construction Allocation -
    18             $180,000)
    19             (Design and Contingencies - $80,000)
    20         (19)  SR 1008, LASSLY'S ROAD BRIDGE,                       <--
    21             DAMASCUS TOWNSHIP, BRIDGE REPLACEMENT         406,000
    22             (BASE CONSTRUCTION ALLOCATION -
    23             $330,000)
    24             (LAND ALLOCATION - $10,000)
    25             (DESIGN AND CONTINGENCIES - $66,000)
    26  Section 69.  Westmoreland County.
    27     (a)  Local Bridges
    28         (1)  Hempfield Township, Airport Hill Road
    29             Bridge over Slate Creek, Bridge
    30             Replacement                                   350,000
    19990S0504B1471                 - 603 -

     1             (Base Construction Allocation -
     2             $280,000)
     3             (Land Allocation - $10,000)
     4             (Design and Contingencies - $60,000)
     5         (2)  Hempfield Township, Sweitzer Road
     6             Bridge over Sewickley Creek, Bridge
     7             Replacement                                   975,000
     8             (Base Construction Allocation -
     9             $800,000)
    10             (Land Allocation - $15,000)
    11             (Design and Contingencies - $160,000)
    12         (3)  Hempfield Township, Ladysmith Road
    13             Bridge over Little Sewickley Creek,
    14             Bridge Replacement                            813,000
    15             (Base Construction Allocation -
    16             $613,000)
    17             (Land Allocation - $50,000)
    18             (Design and Contingencies - $150,000)
    19         (4)  Hempfield Township, Old Route 30
    20             Bridge over Slate Creek, Bridge
    21             Replacement                                   370,000
    22             (Base Construction Allocation -
    23             $300,000)
    24             (Land Allocation - $10,000)
    25             (Design and Contingencies - $60,000)
    26         (5)  Hempfield Township, Old Route 119
    27             Bridge over Tributary of Jacks Run,
    28             Bridge Replacement                            428,000
    29             (Base Construction Allocation -
    30             $288,000)
    19990S0504B1471                 - 604 -

     1             (Land Allocation - $15,000)
     2             (Design and Contingencies - $125,000)
     3         (6)  Jeanette City, 6th Street Bridge over
     4             Brush Creek, Bridge Replacement               460,000
     5             (Base Construction Allocation -
     6             $340,000)
     7             (Land Allocation - $20,000)
     8             (Design and Contingencies - $100,000)
     9         (7)  Ligonier Township, T-605, Bridge over
    10             Two Mile Run, Bridge Replacement              320,000
    11             (Base Construction Allocation -
    12             $200,000)
    13             (Land Allocation - $20,000)
    14             (Design and Contingencies - $100,000)
    15         (8)  Ligonier Township, T-617, Bridge over
    16             Mill Run, Bridge Replacement                  310,000
    17             (Base Construction Allocation -
    18             $190,000)
    19             (Land Allocation - $20,000)
    20             (Design and Contingencies - $100,000)
    21         (9)  Hempfield Township, Possum Hollow Road
    22             Bridge over Tributary of Little
    23             Sewickley Creek, Bridge Replacement           428,000
    24             (Base Construction Allocation -
    25             $288,000)
    26             (Land Allocation - $15,000)
    27             (Design and Contingencies - $125,000)
    28         (10)  South Huntington Township, T-390,
    29             Williams Road Bridge, Bridge
    30             Replacement                                   125,000
    19990S0504B1471                 - 605 -

     1             (Base Construction Allocation -
     2             $100,000)
     3             (Land Allocation - $5,000)
     4             (Design and Contingencies - $20,000)
     5         (11)  South Huntington Township, T-562,
     6             J.D. Smith Road Bridge, Bridge
     7             Replacement                                   155,000
     8             (Base Construction Allocation -
     9             $125,000)
    10             (Land Allocation - $5,000)
    11             (Design and Contingencies - $25,000)
    12         (12)  South Huntington Township, T-386,
    13             Bridge No.1, Mount Etna Road Bridge,
    14             Bridge Replacement                            145,000
    15             (Base Construction Allocation -
    16             $115,000)
    17             (Land Allocation - $5,000)
    18             (Design and Contingencies - $25,000)
    19         (13)  South Huntington Township, T-386,
    20             Bridge No.2, Mount Etna Road at Remo
    21             Road, Bridge Replacement                      135,000
    22             (Base Construction Allocation -
    23             $110,000)
    24             (Land Allocation - $5,000)
    25             (Design and Contingencies - $20,000)
    26         (14)  South Huntington Township, T-385,
    27             Commer Road Bridge, Bridge Replacement        150,000
    28             (Base Construction Allocation -
    29             $120,000)
    30             (Land Allocation - $5,000)
    19990S0504B1471                 - 606 -

     1             (Design and Contingencies - $25,000)
     2         (15)  Washington Township, T-979, Pleasant
     3             View Road Bridge over Beaver Run,
     4             Bridge Replacement                            385,000
     5             (Base Construction Allocation -
     6             $265,000)
     7             (Land Allocation - $20,000)
     8             (Design and Contingencies - $100,000)
     9         (16)  Derry Township, T-924, Bridge over
    10             Union Run, Bridge Replacement                 578,000
    11             (Base Construction Allocation -
    12             $463,000)
    13             (Land Allocation - $15,000)
    14             (Design and Contingencies - $100,000)
    15         (17)  Derry Township, T-937, Bridge over
    16             Stony Run, Bridge Replacement                 553,000
    17             (Base Construction Allocation -
    18             $438,000)
    19             (Land Allocation - $15,000)
    20             (Design and Contingencies - $100,000)
    21         (18)  Derry Township, T-941, Bridge over
    22             Stony Run, Bridge Replacement                 590,000
    23             (Base Construction Allocation -
    24             $475,000)
    25             (Land Allocation - $15,000)
    26             (Design and Contingencies - $100,000)
    27         (19)  Donegal Township, T-916, Bridge over
    28             Indian Creek, Bridge Replacement              465,000
    29             (Base Construction Allocation -
    30             $350,000)
    19990S0504B1471                 - 607 -

     1             (Land Allocation - $15,000)
     2             (Design and Contingencies - $100,000)
     3         (20)  Donegal Township, T-880, Bridge over
     4             Four Mile Run, Bridge No.3, Bridge
     5             Replacement                                   415,000
     6             (Base Construction Allocation -
     7             $300,000)
     8             (Land Allocation - $15,000)
     9             (Design and Contingencies - $100,000)
    10         (21)  Donegal Township, T-880, Bridge over
    11             Four Mile Run, Bridge No.5, Bridge
    12             Replacement                                   415,000
    13             (Base Construction Allocation -
    14             $300,000)
    15             (Land Allocation - $15,000)
    16             (Design and Contingencies - $100,000)
    17         (22)  Fairfield Township, T-739, Berkey's
    18             Bridge over Unnamed Tributary, Bridge
    19             Replacement                                   200,000
    20             (Base Construction Allocation -
    21             $170,000)
    22             (Land Allocation - $10,000)
    23             (Design and Contingencies - $20,000)
    24         (23)  Fairfield Township, T-847, Bailey's
    25             Bridge over Hendricks Run, Bridge
    26             Replacement                                   200,000
    27             (Base Construction Allocation -
    28             $170,000)
    29             (Land Allocation - $10,000)
    30             (Design and Contingencies - $20,000)
    19990S0504B1471                 - 608 -

     1         (24)  Fairfield Township, T-847, Toby
     2             Bridge over Unnamed Tributary, Bridge
     3             Replacement                                   200,000
     4             (Base Construction Allocation -
     5             $170,000)
     6             (Land Allocation - $10,000)
     7             (Design and Contingencies - $20,000)
     8         (25)  Fairfield Township, T-931, Patterson
     9             Bridge No.1 over Bear Pond Run, Bridge
    10             Replacement                                   200,000
    11             (Base Construction Allocation -
    12             $170,000)
    13             (Land Allocation - $10,000)
    14             (Design and Contingencies - $20,000)
    15         (26)  Fairfield Township, T-984, Love
    16             Hollow Bridge No.1 over Hendricks Run,
    17             Bridge Replacement                            200,000
    18             (Base Construction Allocation -
    19             $170,000)
    20             (Land Allocation - $10,000)
    21             (Design and Contingencies - $20,000)
    22         (27)  Fairfield Township, T-984, Love
    23             Hollow Bridge No.2 over Hendricks Run,
    24             Bridge Replacement                            200,000
    25             (Base Construction Allocation -
    26             $170,000)
    27             (Land Allocation - $10,000)
    28             (Design and Contingencies - $20,000)
    29         (28)  Fairfield Township, T-988, Yeager
    30             Hollow Bridge No.1 over Unnamed
    19990S0504B1471                 - 609 -

     1             Tributary, Bridge Replacement                 200,000
     2             (Base Construction Allocation -
     3             $170,000)
     4             (Land Allocation - $10,000)
     5             (Design and Contingencies - $20,000)
     6         (29)  Fairfield Township, T-988, Yeager
     7             Hollow Bridge No.2 over Unnamed
     8             Tributary, Bridge Replacement                 200,000
     9             (Base Construction Allocation -
    10             $170,000)
    11             (Land Allocation - $10,000)
    12             (Design and Contingencies - $20,000)
    13         (30)  Fairfield Township, T-990, Patterson
    14             Bridge No.2 over Unnamed Tributary,
    15             Bridge Replacement                            200,000
    16             (Base Construction Allocation -
    17             $170,000)
    18             (Land Allocation - $10,000)
    19             (Design and Contingencies - $20,000)
    20         (31)  Ligonier Township, T-505, Horner Hill
    21             Road over Laughlintown Run, Bridge
    22             Replacement                                   175,000
    23             (Base Construction Allocation -
    24             $125,000)
    25             (Land Allocation - $15,000)
    26             (Design and Contingencies - $35,000)
    27         (32)  Ligonier Township, T-607, Weller Road
    28             over Unnamed Stream, Bridge
    29             Replacement                                    10,000
    30             (Base Construction Allocation - $8,000)
    19990S0504B1471                 - 610 -

     1             (Design and Contingencies - $2,000)
     2         (33)  Ligonier Township, T-617, Robb Road
     3             over Hannas Run, Bridge Replacement           310,000
     4             (Base Construction Allocation -
     5             $250,000)
     6             (Land Allocation - $10,000)
     7             (Design and Contingencies - $50,000)
     8         (34)  Ligonier Township, T-719, Peoples
     9             Road over Unnamed Stream, Bridge
    10             Replacement                                   100,000
    11             (Base Construction Allocation -
    12             $75,000)
    13             (Land Allocation - $5,000)
    14             (Design and Contingencies - $20,000)
    15         (35)  Ligonier Township, T-721, Bridge over
    16             North Fork of Trout Run, Bridge
    17             Replacement                                   200,000
    18             (Base Construction Allocation -
    19             $125,000)
    20             (Land Allocation - $10,000)
    21             (Design and Contingencies - $65,000)
    22         (36)  Ligonier Township, T-942, Zion Church
    23             Road over Unnamed Stream, Bridge
    24             Replacement                                    50,000
    25             (Base Construction Allocation -
    26             $35,000)
    27             (Land Allocation - $5,000)
    28             (Design and Contingencies - $10,000)
    29         (37)  Ligonier Township, T-984, Mill Road
    30             over Mill Race, Bridge Replacement             50,000
    19990S0504B1471                 - 611 -

     1             (Base Construction Allocation -
     2             $35,000)
     3             (Land Allocation - $5,000)
     4             (Design and Contingencies - $10,000)
     5         (38)  Ligonier Township, T-950, Old Lincoln
     6             Highway East over Unnamed Stream,
     7             Bridge Rehabilitation                          25,000
     8             (Base Construction Allocation -
     9             $20,000)
    10             (Design and Contingencies - $5,000)
    11         (39)  Ligonier Township, T-984, Harvey Road
    12             over Macks Run, Bridge Rehabilitation           5,000
    13             (Base Construction Allocation - $4,000)
    14             (Design and Contingencies - $1,000)
    15         (40)  Saint Clair Township, T-994, Bridge
    16             over Tubmill Creek, Bridge Replacement        440,000
    17             (Base Construction Allocation -
    18             $325,000)
    19             (Land Allocation - $15,000)
    20             (Design and Contingencies - $100,000)
    21         (41)  Sewickley Township, T-318, Bridge
    22             No.3 over Tributary of Youghiogheny
    23             River, Bridge Replacement                     100,000
    24             (Base Construction Allocation -
    25             $70,000)
    26             (Land Allocation - $5,000)
    27             (Design and Contingencies - $25,000)
    28         (42)  Derry Township, Conrail Overpass over
    29             SR 0981, Bridge Replacement                 1,600,000
    30             (Base Construction Allocation -
    19990S0504B1471                 - 612 -

     1             $1,200,000)
     2             (Land Allocation - $200,000)
     3             (Design and Contingencies - $200,000)
     4         (43)  Hempfield Township, T-399 over Jacks
     5             Run, Bridge Replacement                       428,000
     6             (Base Construction Allocation -
     7             $288,000)
     8             (Land Allocation - $15,000)
     9             (Design and Contingencies - $125,000)
    10         (44)  Hempfield Township, T-550 over
    11             Tributary to Little Sewickley Creek,
    12             Bridge Replacement                            428,000
    13             (Base Construction Allocation -
    14             $288,000)
    15             (Land Allocation - $15,000)
    16             (Design and Contingencies - $125,000)
    17         (45)  Ligonier Township, T-984 over Mill
    18             Creek, Bridge Replacement                     650,000
    19             (Base Construction Allocation -
    20             $450,000)
    21             (Land Allocation - $50,000)
    22             (Design and Contingencies - $150,000)
    23         (46)  Salem Township, T-881, Bridge over
    24             Loyalhanna Creek, Bridge Replacement           82,000
    25             (Base Construction Allocation -
    26             $67,000)
    27             (Design and Contingencies - $15,000)
    28         (47)  Sewickley Township, T-633, Green
    29             Hills Road Bridge over Little Sewickley
    30             Creek, Bridge Replacement                     465,000
    19990S0504B1471                 - 613 -

     1             (Base Construction Allocation -
     2             $325,000)
     3             (Land Allocation - $15,000)
     4             (Design and Contingencies - $125,000)
     5         (48)  DONEGAL TOWNSHIP, T-309, HUNTER LANE                 <--
     6             BRIDGE NO.1 OVER INDIAN CREEK, BRIDGE
     7             REPLACEMENT                                   465,000
     8         (49)  DONEGAL TOWNSHIP, T-880, FOUR-MILE
     9             RUN ROAD BRIDGE NO.2 OVER FOUR-MILE RUN
    10             CREEK, BRIDGE REPLACEMENT                     415,000
    11         (50)  DONEGAL TOWNSHIP, T-880, FOUR-MILE
    12             RUN ROAD BRIDGE NO.3 OVER FOUR-MILE RUN
    13             CREEK, BRIDGE REPLACEMENT                     415,000
    14         (51)  DONEGAL TOWNSHIP, T-314, SKY VIEW
    15             ROAD BRIDGE NO.4 OVER INDIAN CREEK,
    16             BRIDGE REPLACEMENT                            465,000
    17         (52)  SALEM TOWNSHIP, T-628, BRIDGE OVER
    18             BEAVER RUN, BRIDGE REPLACEMENT              1,160,000
    19             (BASE CONSTRUCTION ALLOCATION -
    20             $800,000)
    21             (LAND ALLOCATION - $40,000)
    22             (DESIGN AND CONTINGENCIES - $320,000)
    23     (b)  State Bridges
    24         (1)  SR 0030, Mill Creek Bridge over Mill
    25             Creek, Ligonier Township, Bridge
    26             Replacement                                   910,000
    27             (Base Construction Allocation -
    28             $710,000)
    29             (Land Allocation - $25,000)
    30             (Design and Contingencies - $175,000)
    19990S0504B1471                 - 614 -

     1         (2)  SR 0031, Jacobs Creek Bridge over
     2             Jacobs Creek, Mount Pleasant and
     3             Bullskin Townships, Bridge Replacement        715,000
     4             (Base Construction Allocation -
     5             $500,000)
     6             (Land Allocation - $40,000)
     7             (Design and Contingencies - $175,000)
     8         (3)  SR 0056, Seward Bridge over Conrail
     9             and Local Road, St. Clair Township,
    10             Bridge Painting                               600,000
    11             (Base Construction Allocation -
    12             $600,000)
    13         (4)  SR 0070, I-70 Bridge over N&W
    14             Railroad, Rostraver Township, Bridge
    15             Rehabilitation                              1,565,000
    16             (Base Construction Allocation -
    17             $1,305,000)
    18             (Land Allocation - $60,000)
    19             (Design and Contingencies - $200,000)
    20         (5)  SR 0070, I-70 Bridge over Conrail,
    21             South Huntington Township, Bridge
    22             Rehabilitation                              3,125,000
    23             (Base Construction Allocation -
    24             $2,780,000)
    25             (Land Allocation - $45,000)
    26             (Design and Contingencies - $300,000)
    27         (6)  SR 0119, Crabtree Creek Bridge No.2
    28             over Crabtree Creek, Hempfield
    29             Township, Bridge Replacement                  577,000
    30             (Base Construction Allocation -
    19990S0504B1471                 - 615 -

     1             $377,000)
     2             (Land Allocation - $25,000)
     3             (Design and Contingencies - $175,000)
     4         (7)  SR 0136, West Newton Bridge over
     5             Youghiogheny River, West Newton
     6             Borough, Bridge Painting                      250,000
     7             (Base Construction Allocation -
     8             $250,000)
     9         (8)  SR 0259, Boliver Underpass Conrail
    10             Railroad over SR 0259, Fairfield
    11             Township, Bridge Replacement                  310,000
    12             (Base Construction Allocation -
    13             $200,000)
    14             (Land Allocation - $10,000)
    15             (Design and Contingencies - $100,000)
    16         (9)  SR 0271, Bridge over Mill Creek,
    17             Ligonier Township, Bridge Painting             87,000
    18             (Base Construction Allocation -
    19             $87,000)
    20         (10)  SR 0711, Bridge over Mill Creek,
    21             Ligonier Township, Bridge Painting            125,000
    22             (Base Construction Allocation -
    23             $125,000)
    24         (11)  SR 0819, Bridge over Stauffer Bridge,
    25             Scottdale Borough, Bridge Painting             92,000
    26             (Base Construction Allocation -
    27             $92,000)
    28         (12)  SR 0981, Bridge over Branch of Barron
    29             Run, South Huntington Township, Bridge
    30             Replacement                                   250,000
    19990S0504B1471                 - 616 -

     1             (Base Construction Allocation -
     2             $250,000)
     3         (13)  SR 0982, Bradenville Bridge over
     4             Saxman Run, Derry Township, Bridge
     5             Replacement                                   330,000
     6             (Base Construction Allocation -
     7             $330,000)
     8         (14)  SR 1027, Stoney Run Bridge over
     9             Stoney Run, Derry Township, Bridge
    10             Replacement                                   340,000
    11             (Base Construction Allocation -
    12             $255,000)
    13             (Land Allocation - $10,000)
    14             (Design and Contingencies - $75,000)
    15         (15)  SR 2008, Fourmile Run Bridge over
    16             Fourmile Run, Cook Township, Bridge
    17             Painting                                       83,000
    18             (Base Construction Allocation -
    19             $83,000)
    20         (16)  SR 2010, Bridge over Branch of Boyer
    21             Run, Mount Pleasant Township, Bridge
    22             Replacement                                   450,000
    23             (Base Construction Allocation -
    24             $250,000)
    25             (Land Allocation - $25,000)
    26             (Design and Contingencies - $175,000)
    27         (17)  SR 8036, New Stanton Ramp Bridge over
    28             SR 3091, New Stanton Borough, Bridge
    29             Rehabilitation                                475,000
    30             (Base Construction Allocation -
    19990S0504B1471                 - 617 -

     1             $395,000)
     2             (Design and Contingencies - $80,000)
     3         (18)  SR 0030, SR 0030 over Mill Creek,
     4             Ligonier Township, Bridge
     5             Rehabilitation                                200,000
     6             (Base Construction Allocation -
     7             $150,000)
     8             (Design and Contingencies - $50,000)
     9         (19)  SR 0030, SR 0030 over Branch of
    10             Loyalhanna Creek, Unity Township,
    11             Bridge Replacement                            245,000
    12             (Base Construction Allocation -
    13             $125,000)
    14             (Land Allocation - $20,000)
    15             (Design and Contingencies - $100,000)
    16         (20)  SR 0217, SR 0217 over Miller Run,
    17             Derry Township, Bridge Replacement            293,000
    18             (Base Construction Allocation -
    19             $188,000)
    20             (Land Allocation - $5,000)
    21             (Design and Contingencies - $100,000)
    22         (21)  SR 0259, SR 0259 over Branch of
    23             Freeman Run, Fairfield Township, Bridge
    24             Replacement                                   218,000
    25             (Base Construction Allocation -
    26             $113,000)
    27             (Land Allocation - $5,000)
    28             (Design and Contingencies - $100,000)
    29         (22)  SR 0381, SR 0381 over Branch of
    30             Loyalhanna Creek, Cook Township, Bridge
    19990S0504B1471                 - 618 -

     1             Replacement                                   670,000
     2             (Base Construction Allocation -
     3             $450,000)
     4             (Land Allocation - $20,000)
     5             (Design and Contingencies - $200,000)
     6         (23)  SR 0381, SR 0381 over Camp Run,
     7             Donegal Township, Bridge Replacement          608,000
     8             (Base Construction Allocation -
     9             $388,000)
    10             (Land Allocation - $20,000)
    11             (Design and Contingencies - $200,000)
    12         (24)  SR 0711, SR 0711 over Mill Creek,
    13             Ligonier Township, Bridge Replacement         600,000
    14             (Base Construction Allocation -
    15             $450,000)
    16             (Land Allocation - $50,000)
    17             (Design and Contingencies - $100,000)
    18         (25)  SR 0982, SR 0982 over Jacobs Creek,
    19             Mount Pleasant Township, Bridge
    20             Replacement                                   938,000
    21             (Base Construction Allocation -
    22             $688,000)
    23             (Land Allocation - $50,000)
    24             (Design and Contingencies - $200,000)
    25         (26)  SR 0982, SR 0982 over Nine Mile Run,
    26             Unity Township, Bridge Replacement            348,000
    27             (Base Construction Allocation -
    28             $238,000)
    29             (Land Allocation - $10,000)
    30             (Design and Contingencies - $100,000)
    19990S0504B1471                 - 619 -

     1         (27)  SR 0982, SR 0982 over Indian Camp
     2             Run, Unity Township, Bridge
     3             Replacement                                   335,000
     4             (Base Construction Allocation -
     5             $225,000)
     6             (Land Allocation - $10,000)
     7             (Design and Contingencies - $100,000)
     8         (28)  SR 1004, SR 1004 over Hendricks
     9             Creek, Fairfield Township, Bridge
    10             Replacement                                   200,000
    11             (Base Construction Allocation -
    12             $170,000)
    13             (Land Allocation - $10,000)
    14             (Design and Contingencies - $20,000)
    15         (29)  SR 1006, SR 1006 over Freeman Run,
    16             Fairfield Township, Bridge Replacement        833,000
    17             (Base Construction Allocation -
    18             $613,000)
    19             (Land Allocation - $20,000)
    20             (Design and Contingencies - $200,000)
    21         (30)  SR 1006, West Bolivar Bridge near
    22             Treasure Island, Fairfield Township,
    23             Bridge Replacement                            200,000
    24             (Base Construction Allocation -
    25             $170,000)
    26             (Land Allocation - $10,000)
    27             (Design and Contingencies - $20,000)
    28         (31)  SR 1007, SR 1007 over Tubmill Run,
    29             Fairfield Township, Bridge Replacement        465,000
    30             (Base Construction Allocation -
    19990S0504B1471                 - 620 -

     1             $350,000)
     2             (Land Allocation - $15,000)
     3             (Design and Contingencies - $100,000)
     4         (32)  SR 1012, SR 1012 over Branch of Megee
     5             Run, Derry Township, Bridge
     6             Replacement                                   318,000
     7             (Base Construction Allocation -
     8             $213,000)
     9             (Land Allocation - $5,000)
    10             (Design and Contingencies - $100,000)
    11         (33)  SR 1014, SR 1014 over Abandoned
    12             Railroad, Derry Township, Bridge
    13             Replacement                                   268,000
    14             (Base Construction Allocation -
    15             $163,000)
    16             (Land Allocation - $5,000)
    17             (Design and Contingencies - $100,000)
    18         (34)  SR 1015, SR 1015 over Hypocrite
    19             Creek, Fairfield Township, Bridge
    20             Replacement                                   200,000
    21             (Base Construction Allocation -
    22             $170,000)
    23             (Land Allocation - $10,000)
    24             (Design and Contingencies - $20,000)
    25         (35)  SR 1027, SR 1027 over Branch of Stony
    26             Run, Derry Township, Bridge
    27             Replacement                                   305,000
    28             (Base Construction Allocation -
    29             $200,000)
    30             (Land Allocation - $5,000)
    19990S0504B1471                 - 621 -

     1             (Design and Contingencies - $100,000)
     2         (36)  SR 1031, SR 1031 over McCune Run,
     3             Derry Township, Bridge Replacement            293,000
     4             (Base Construction Allocation -
     5             $188,000)
     6             (Land Allocation - $5,000)
     7             (Design and Contingencies - $100,000)
     8         (37)  SR 2006, SR 2006 over Branch of
     9             Jacobs Creek, Mt. Pleasant Township,
    10             Bridge Replacement                            403,000
    11             (Base Construction Allocation -
    12             $288,000)
    13             (Land Allocation - $15,000)
    14             (Design and Contingencies - $100,000)
    15         (38)  SR 2007, SR 2007 over Shupe Run, Mt.
    16             Pleasant Township, Bridge Replacement         218,000
    17             (Base Construction Allocation -
    18             $113,000)
    19             (Land Allocation - $5,000)
    20             (Design and Contingencies - $100,000)
    21         (39)  SR 2012, SR 2012 over Brinker Run,
    22             Mt. Pleasant Township, Bridge
    23             Replacement                                   415,000
    24             (Base Construction Allocation -
    25             $300,000)
    26             (Land Allocation - $15,000)
    27             (Design and Contingencies - $100,000)
    28         (40)  SR 2021, SR 2021 over Sewickley
    29             Creek, Mt. Pleasant Township, Bridge
    30             Replacement                                 1,463,000
    19990S0504B1471                 - 622 -

     1             (Base Construction Allocation -
     2             $1,213,000)
     3             (Land Allocation - $50,000)
     4             (Design and Contingencies - $200,000)
     5         (41)  SR 2025, SR 2025 over Tributary of
     6             Jacobs Creek, Mt. Pleasant Township,
     7             Bridge Replacement                            250,000
     8             (Base Construction Allocation -
     9             $225,000)
    10             (Design and Contingencies - $25,000)
    11         (42)  SR 4034, SR 4034 over Pine Run,
    12             Allegheny Township, Bridge Replacement        818,000
    13             (Base Construction Allocation -
    14             $588,000)
    15             (Land Allocation - $30,000)
    16             (Design and Contingencies - $200,000)
    17         (43)  SR 4071, SR 4071 over Branch of Pine
    18             Run, Allegheny Township, Bridge
    19             Replacement                                   305,000
    20             (Base Construction Allocation -
    21             $200,000)
    22             (Land Allocation - $5,000)
    23             (Design and Contingencies - $100,000)
    24         (44)  SR 4089, SR 4089 over Branch of
    25             Chartiers Run, Allegheny Township,
    26             Bridge Replacement                            348,000
    27             (Base Construction Allocation -
    28             $238,000)
    29             (Land Allocation - $10,000)
    30             (Design and Contingencies - $100,000)
    19990S0504B1471                 - 623 -

     1         (45)  T-987, (formerly SR 1071) over
     2             Hypocrite Creek, Fairfield Township,
     3             Four State Bridges, Bridge Replacement        800,000
     4             (Base Construction Allocation -
     5             $680,000)
     6             (Land Allocation - $40,000)
     7             (Design and Contingencies - $80,000)
     8         (46)  SR 0381, SR 0381 over Laughlintown
     9             Run, Ligonier Township, Bridge
    10             Replacement                                   465,000
    11             (Base Construction Allocation -
    12             $350,000)
    13             (Land Allocation - $15,000)
    14             (Design and Contingencies - $100,000)
    15         (47)  SR 2043, SR 2043 over Two Mile Run,
    16             Ligonier Township, Bridge Replacement         465,000
    17             (Base Construction Allocation -
    18             $350,000)
    19             (Land Allocation - $15,000)
    20             (Design and Contingencies - $100,000)
    21         (48)  SR 2045, SR 2045 over Two Mile Run,
    22             Ligonier Township, Bridge Replacement         465,000
    23             (Base Construction Allocation -
    24             $350,000)
    25             (Land Allocation - $15,000)
    26             (Design and Contingencies - $100,000)
    27         (49)  SR 2045, SR 2045 over Loyalhanna
    28             Creek, Ligonier Township, Bridge
    29             Replacement                                 1,588,000
    30             (Base Construction Allocation -
    19990S0504B1471                 - 624 -

     1             $1,313,000)
     2             (Land Allocation - $75,000)
     3             (Design and Contingencies - $200,000)
     4         (50)  SR 0119, Bridge No.2 over Crabtree
     5             Creek, Hempfield Township, Bridge
     6             Replacement                                   577,000
     7             (Base Construction Allocation -
     8             $377,000)
     9             (Land Allocation - $25,000)
    10             (Design and Contingencies - $175,000)
    11         (51)  SR 8036, New Stanton Ramp Bridge over
    12             SR 3091, Turnback Project, New Stanton
    13             Borough, Bridge Rehabilitation                475,000
    14             (Base Construction Allocation -
    15             $395,000)
    16             (Design and Contingencies - $80,000)
    17         (52)  SR 2045, Bridge over Loyalhanna
    18             Creek, Ligonier Township, Bridge
    19             Replacement                                   800,000
    20             (Base Construction Allocation -
    21             $600,000)
    22             (Land Allocation - $25,000)
    23             (Design and Contingencies - $175,000)
    24         (53)  SR 3037, Bridge over Branch of
    25             Sewickley Creek, South Huntingdon
    26             Township, Bridge Replacement                  425,000
    27             (Base Construction Allocation -
    28             $225,000)
    29             (Land Allocation - $25,000)
    30             (Design and Contingencies - $175,000)
    19990S0504B1471                 - 625 -

     1         (54)  SR 3075, Bridge over Branch of
     2             Sewickley Creek, Hempfield Township,
     3             Bridge Replacement                            319,000
     4             (Base Construction Allocation -
     5             $94,000)
     6             (Land Allocation - $50,000)
     7             (Design and Contingencies - $175,000)
     8         (55)  SR 0259, Bolivar Bridge over
     9             Conemaugh River, Bridge Replacement         6,750,000
    10             (Base Construction Allocation -
    11             $5,500,000)
    12             (Land Allocation - $750,000)
    13             (Design and Contingencies - $500,000)
    14         (56)  SR 0381, BRIDGE OVER LOYALHANNA                      <--
    15             CREEK, LIGONIER TOWNSHIP, BRIDGE
    16             REPLACEMENT                                 1,138,000
    17             (BASE CONSTRUCTION ALLOCATION -
    18             $913,000)
    19             (LAND ALLOCATION - $50,000)
    20             (DESIGN AND CONTINGENCIES - $175,000)
    21         (57)  SR 0381, BRIDGE OVER LINN RUN,
    22             LIGONIER TOWNSHIP, BRIDGE REPLACEMENT         663,000
    23             (BASE CONSTRUCTION ALLOCATION -
    24             $463,000)
    25             (LAND ALLOCATION - $50,000)
    26             (DESIGN AND CONTINGENCIES - $150,000)
    27  Section 70.  Wyoming County.
    28     (a)  Local Bridges
    29         (1)  Exeter Township, T-336, Bridge No.1, 2
    30             Miles Southwest of Falls, Bridge
    19990S0504B1471                 - 626 -

     1             Replacement                                   280,000
     2             (Base Construction Allocation -
     3             $240,000)
     4             (Land Allocation - $10,000)
     5             (Design and Contingencies - $30,000)
     6         (2)  Falls Township, T-336 over White Lock
     7             Stream, Bridge Replacement                    280,000
     8             (Base Construction Allocation -
     9             $240,000)
    10             (Land Allocation - $10,000)
    11             (Design and Contingencies - $30,000)
    12         (3)  Exeter Township, T-336 over Mill
    13             Creek, Bridge Replacement                     214,000
    14             (Base Construction Allocation -
    15             $166,000)
    16             (Land Allocation - $20,000)
    17             (Design and Contingencies - $28,000)
    18         (4)  Eaton Township, T-413, Pedestrian
    19             Bridge over Bowman's Creek at
    20             Eatonville, Bridge Rehabilitation             125,000
    21             (Base Construction Allocation -
    22             $113,000)
    23             (Design and Contingencies - $12,000)
    24     (b)  State Bridges
    25         (1)  SR 3001, Bridge at Junction with SR
    26             4004 over Branch of Susquehanna River,
    27             Windham Township, Bridge Painting              60,000
    28             (Base Construction Allocation -
    29             $50,000)
    30             (Design and Contingencies - $10,000)
    19990S0504B1471                 - 627 -

     1         (2)  State Bridges, Countywide Bridge Zone
     2             Painting, Bridge Painting                     370,000
     3             (Base Construction Allocation -
     4             $350,000)
     5             (Land Allocation - $10,000)
     6             (Design and Contingencies - $10,000)
     7         (3)  SR 0006, Meshoppen Creek Bridge over
     8             Meshoppen Creek, Meshoppen Borough,
     9             Bridge Rehabilitation                         340,000
    10             (Base Construction Allocation -
    11             $300,000)
    12             (Design and Contingencies - $40,000)
    13         (4)  SR 3003, Bowmans Creek Bridge over
    14             Bowmans Creek, Eaton Township, Bridge
    15             Replacement                                   260,000
    16             (Base Construction Allocation -
    17             $200,000)
    18             (Design and Contingencies - $60,000)
    19         (5)  SR 2032, BRIDGE OVER DELAWARE AND                     <--
    20             HUDSON RAILWAY, NICHOLSON BOROUGH,
    21             CONCRETE REPAIRS                              200,000
    22             (BASE CONSTRUCTION ALLOCATION -
    23             $170,000)
    24             (DESIGN AND CONTINGENCIES - $30,000)
    25  Section 71.  York County.
    26     (a)  Local Bridges
    27         (1)  Carroll Township, Gettysburg Road
    28             Bridge over Yellow Breeches Creek,
    29             Bridge Replacement                            860,000
    30             (Base Construction Allocation -
    19990S0504B1471                 - 628 -

     1             $700,000)
     2             (Land Allocation - $10,000)
     3             (Design and Contingencies - $150,000)
     4         (2)  Codorus Township, Seitzville Road over
     5             South Branch of Codorus Creek, Bridge
     6             Replacement                                   300,000
     7             (Base Construction Allocation -
     8             $200,000)
     9             (Land Allocation - $15,000)
    10             (Design and Contingencies - $85,000)
    11         (3)  Dover Township, Cardinal Lane over Fox
    12             Run, Bridge Replacement                       115,000
    13             (Base Construction Allocation -
    14             $70,000)
    15             (Land Allocation - $15,000)
    16             (Design and Contingencies - $30,000)
    17         (4)  Dover Township, Conewago Road over
    18             Salem Run, Bridge Replacement                 300,000
    19             (Base Construction Allocation -
    20             $200,000)
    21             (Land Allocation - $15,000)
    22             (Design and Contingencies - $85,000)
    23         (5)  East Hopewell Township, South Church
    24             Street Extended, Bridge No.1, Bridge
    25             Rehabilitation                                  9,000
    26             (Base Construction Allocation - $8,000)
    27             (Design and Contingencies - $1,000)
    28         (6)  East Hopewell Township, South Church
    29             Street Extended, Bridge No.2, over
    30             Rambo Run, Bridge Rehabilitation               60,000
    19990S0504B1471                 - 629 -

     1             (Base Construction Allocation -
     2             $50,000)
     3             (Design and Contingencies - $10,000)
     4         (7)  East Hopewell Township, Manifold
     5             School Road Bridge, Bridge
     6             Rehabilitation                                  7,000
     7             (Base Construction Allocation - $6,000)
     8             (Design and Contingencies - $1,000)
     9         (8)  East Hopewell Township, Trout School
    10             Road Bridge, Bridge Replacement                45,000
    11             (Base Construction Allocation -
    12             $30,000)
    13             (Land Allocation - $5,000)
    14             (Design and Contingencies - $10,000)
    15         (9)  Hellam Township, Valley Acres Road
    16             over Tributary of Kreutz Creek, Bridge
    17             Rehabilitation                                 40,000
    18             (Base Construction Allocation -
    19             $35,000)
    20             (Design and Contingencies - $5,000)
    21         (10)  Hellam Township, Libhart Mill Road
    22             over Tributary of Kreutz Creek, Bridge
    23             Rehabilitation                                 40,000
    24             (Base Construction Allocation -
    25             $35,000)
    26             (Design and Contingencies - $5,000)
    27         (11)  Manchester Township, T-900, Woodland
    28             View Drive over Conrail, Bridge
    29             Replacement                                   395,000
    30             (Base Construction Allocation -
    19990S0504B1471                 - 630 -

     1             $275,000)
     2             (Land Allocation - $30,000)
     3             (Design and Contingencies - $90,000)
     4         (12)  Manchester Township, T-940, Bear Road
     5             2,000 Feet North of Susquehanna Trail,
     6             Bridge Replacement                             40,000
     7             (Base Construction Allocation -
     8             $25,000)
     9             (Land Allocation - $5,000)
    10             (Design and Contingencies - $10,000)
    11         (13)  Manheim Township, T-320 over Unnamed
    12             Tributary of Gunpowder Falls Creek,
    13             Bridge Replacement                            150,000
    14             (Base Construction Allocation -
    15             $100,000)
    16             (Land Allocation - $10,000)
    17             (Design and Contingencies - $40,000)
    18         (14)  Manheim Township, T-346 over West
    19             Branch of Codorus Creek, Bridge
    20             Replacement                                   250,000
    21             (Base Construction Allocation -
    22             $190,000)
    23             (Land Allocation - $10,000)
    24             (Design and Contingencies - $50,000)
    25         (15)  Manheim Township, T-357 over Unnamed
    26             Tributary of West Branch of Codorus
    27             Creek, Bridge Replacement                     160,000
    28             (Base Construction Allocation -
    29             $110,000)
    30             (Land Allocation - $10,000)
    19990S0504B1471                 - 631 -

     1             (Design and Contingencies - $40,000)
     2         (16)  Manheim Township, T-370 over West
     3             Branch of Codorus Creek, Bridge
     4             Replacement                                   200,000
     5             (Base Construction Allocation -
     6             $140,000)
     7             (Land Allocation - $10,000)
     8             (Design and Contingencies - $50,000)
     9         (17)  Manheim Township, T-413 over West
    10             Branch of Codorus Creek, Bridge
    11             Replacement                                   150,000
    12             (Base Construction Allocation -
    13             $100,000)
    14             (Land Allocation - $10,000)
    15             (Design and Contingencies - $40,000)
    16         (18)  Manheim Township, Tannery Road over
    17             West Branch of Codorus Creek, Bridge
    18             Replacement                                   250,000
    19             (Base Construction Allocation -
    20             $180,000)
    21             (Land Allocation - $10,000)
    22             (Design and Contingencies - $60,000)
    23         (19)  Paradise Township, Shady Dell Road,
    24             Bridge Replacement                            190,000
    25             (Base Construction Allocation -
    26             $110,000)
    27             (Land Allocation - $10,000)
    28             (Design and Contingencies - $70,000)
    29         (20)  Paradise Township, Beaver Creek Road
    30             over Beaver Creek, Bridge Replacement         275,000  <--
    19990S0504B1471                 - 632 -

     1             (Base Construction Allocation -
     2             $195,000)
     3             (Land Allocation - $10,000)
     4             (Design and Contingencies - $70,000)
     5             OVER BEAVER CREEK, BRIDGE REPLACEMENT         370,000  <--
     6             (BASE CONSTRUCTION ALLOCATION -
     7             $265,000)
     8             (LAND ALLOCATION - $5,000)
     9             (DESIGN AND CONTINGENCIES - $100,000)
    10         (21)  Penn Township, Center Street over
    11             Tributary of Oil Creek, Bridge
    12             Replacement                                   183,000
    13             (Base Construction Allocation -
    14             $163,000)
    15             (Land Allocation - $10,000)
    16             (Design and Contingencies - $10,000)
    17         (22)  Penn Township, Westminster Avenue
    18             over Plum Creek, Bridge Replacement           230,000
    19             (Base Construction Allocation -
    20             $207,000)
    21             (Land Allocation - $8,000)
    22             (Design and Contingencies - $15,000)
    23         (23)  Penn Township, Park Heights over
    24             Tributary of Plum Creek, Bridge
    25             Replacement                                   244,000
    26             (Base Construction Allocation -
    27             $234,000)
    28             (Design and Contingencies - $10,000)
    29         (24)  Red Lion Borough, North Charles
    30             Street over Former Maryland and
    19990S0504B1471                 - 633 -

     1             Pennsylvania Railroad, Bridge
     2             Replacement                                   395,000
     3             (Base Construction Allocation -
     4             $275,000)
     5             (Land Allocation - $30,000)
     6             (Design and Contingencies - $90,000)
     7         (25)  Spring Garden Township, Tri Hill Road
     8             over Tyler Run, Bridge Replacement            200,000
     9             (Base Construction Allocation -
    10             $120,000)
    11             (Land Allocation - $20,000)
    12             (Design and Contingencies - $60,000)
    13         (26)  Windsor Borough, West Gay Street over
    14             Fishing Creek, Bridge Replacement             200,000
    15             (Base Construction Allocation -
    16             $120,000)
    17             (Land Allocation - $20,000)
    18             (Design and Contingencies - $60,000)
    19         (27)  York Township, School Street over
    20             Branch of Mill Creek, Bridge
    21             Replacement                                   250,000
    22             (Base Construction Allocation -
    23             $200,000)
    24             (Design and Contingencies - $50,000)
    25         (28)  Conewago Township, T-956 over Billion
    26             Run, Bridge Replacement                       290,000
    27             (Base Construction Allocation -
    28             $220,000)
    29             (Land Allocation - $10,000)
    30             (Design and Contingencies - $60,000)
    19990S0504B1471                 - 634 -

     1         (29)  Conewago Township, T-956 over Poplar
     2             Run, Bridge Replacement                       310,000
     3             (Base Construction Allocation -
     4             $240,000)
     5             (Land Allocation - $10,000)
     6             (Design and Contingencies - $60,000)
     7         (30)  Newberry Township, Intersection of SR
     8             1009 and SR 0262, Bridge over Fishing
     9             Creek, Bridge Replacement                     750,000
    10         (31)  Newberry Township and Goldsboro
    11             Borough, SR 0262 and SR 1009, Bridge
    12             over Fishing Creek, Bridge Replacement        800,000
    13         (32)  JACKSON TOWNSHIP, PINE ROAD BRIDGE                   <--
    14             OVER TRIBUTARY OF PARADISE CREEK,
    15             BRIDGE REPLACEMENT                            188,000
    16             (BASE CONSTRUCTION ALLOCATION -
    17             $140,000)
    18             (LAND ALLOCATION - $5,000)
    19             (DESIGN AND CONTINGENCIES - $43,000)
    20         (33)  LOWER WINDSOR TOWNSHIP, WILLOW CREEK
    21             ROAD BRIDGE OVER CABIN CREEK, BRIDGE
    22             REPLACEMENT                                   110,000
    23             (BASE CONSTRUCTION ALLOCATION -
    24             $100,000)
    25             (DESIGN AND CONTINGENCIES - $10,000)
    26         (34)  WEST MANCHESTER TOWNSHIP AND DOVER
    27             TOWNSHIP, BAKER ROAD BRIDGE OVER LITTLE
    28             CONEWAGO CREEK, BRIDGE REPLACEMENT            530,000
    29             (BASE CONSTRUCTION ALLOCATION -
    30             $390,000)
    19990S0504B1471                 - 635 -

     1             (LAND ALLOCATION - $15,000)
     2             (DESIGN AND CONTINGENCIES - $125,000)
     3         (35)  HEIDELBERG TOWNSHIP, GITTS RUN ROAD
     4             BRIDGE OVER OIL CREEK, BRIDGE
     5             REHABILITATION                                106,000
     6             (BASE CONSTRUCTION ALLOCATION -
     7             $78,000)
     8             (LAND ALLOCATION - $10,000)
     9             (DESIGN AND CONTINGENCIES - $18,000)
    10     (b)  State Bridges
    11         (1)  SR 0194, Broadway Street Bridge over
    12             Red Run, Washington Township, Bridge
    13             Replacement                                   245,000
    14             (Base Construction Allocation -
    15             $150,000)
    16             (Land Allocation - $10,000)
    17             (Design and Contingencies - $85,000)
    18         (2)  SR 0234, East Berlin Road Bridge over
    19             Paradise Creek, Jackson Township,
    20             Bridge Replacement                            325,000
    21             (Base Construction Allocation -
    22             $250,000)
    23             (Land Allocation - $10,000)
    24             (Design and Contingencies - $65,000)
    25         (3)  SR 3074, Smoketown Road Bridge over
    26             Cod Creek, Manheim Township, Bridge
    27             Replacement                                   325,000
    28             (Base Construction Allocation -
    29             $215,000)
    30             (Land Allocation - $10,000)
    19990S0504B1471                 - 636 -

     1             (Design and Contingencies - $100,000)
     2         (4)  SR 0116, York Street over Tributary of
     3             Oil Creek, Penn Township, Bridge
     4             Replacement                                   275,000
     5             (Base Construction Allocation -
     6             $240,000)
     7             (Land Allocation - $15,000)
     8             (Design and Contingencies - $20,000)
     9         (5)  SR 0116, SR 0116 over Codorus Creek,
    10             Spring Grove Borough, Bridge
    11             Replacement                                   300,000
    12             (Base Construction Allocation -
    13             $240,000)
    14             (Land Allocation - $15,000)
    15             (Design and Contingencies - $45,000)
    16         (6)  SR 0194, Frederick Street over Plum
    17             Creek, Penn Township, Bridge
    18             Replacement                                   262,000
    19             (Base Construction Allocation -
    20             $234,000)
    21             (Land Allocation - $8,000)
    22             (Design and Contingencies - $20,000)
    23         (7)  SR 1012, Emig Road over Conrail,
    24             Manchester Township, Bridge
    25             Replacement                                   395,000
    26             (Base Construction Allocation -
    27             $275,000)
    28             (Land Allocation - $30,000)
    29             (Design and Contingencies - $90,000)
    30         (8)  SR 2031, Penn Street over Fishing
    19990S0504B1471                 - 637 -

     1             Creek, Windsor Borough, Bridge
     2             Replacement                                   200,000
     3             (Base Construction Allocation -
     4             $120,000)
     5             (Land Allocation - $20,000)
     6             (Design and Contingencies - $60,000)
     7         (9)  SR 3001, South George Street over
     8             Tyler Run, Spring Garden Township,
     9             Bridge Replacement                            200,000
    10             (Base Construction Allocation -
    11             $120,000)
    12             (Land Allocation - $20,000)
    13             (Design and Contingencies - $60,000)
    14         (10)  SR 3074, Smoketown Road Bridge over
    15             Codorus Creek, Manheim Township, Bridge
    16             Replacement                                   240,000
    17             (Base Construction Allocation -
    18             $150,000)
    19             (Land Allocation - $10,000)
    20             (Design and Contingencies - $80,000)
    21         (11)  SR 3074, Bridge over Tributary of
    22             Codorus Creek, Manheim Township, Bridge
    23             Replacement                                   750,000
    24             (Base Construction Allocation -
    25             $555,000)
    26             (Land Allocation - $56,000)
    27             (Design and Contingencies - $139,000)
    28         (12)  SR 3015, Bridge over Centerville
    29             Creek, Codorus Township, Bridge
    30             Replacement                                   477,000
    19990S0504B1471                 - 638 -

     1             (Base Construction Allocation -
     2             $354,000)
     3             (Land Allocation - $35,000)
     4             (Design and Contingencies - $88,000)
     5         (13)  SR 1009, Bridge over Fishing Creek,
     6             Newberry Township, Bridge Replacement         815,000
     7             (Base Construction Allocation -
     8             $604,000)
     9             (Land Allocation - $60,000)
    10             (Design and Contingencies - $151,000)
    11         (14)  PA 216, Bridge over Centerville
    12             Creek, Codorus Township, Bridge
    13             Replacement                                   604,000
    14             (Base Construction Allocation -
    15             $447,000)
    16             (Land Allocation - $45,000)
    17             (Design and Contingencies - $112,000)
    18         (15)  SR 2038, Bridge over Little Muddy
    19             Creek, East Hopewell Township, Bridge
    20             Replacement                                   366,000
    21             (Base Construction Allocation -
    22             $271,000)
    23             (Land Allocation - $27,000)
    24             (Design and Contingencies - $68,000)
    25         (16)  SR 2069, NEW PARK ROAD BRIDGE OVER                   <--
    26             TRIBUTARY OF ALUM CREEK, FAWN TOWNSHIP,
    27             BRIDGE REPLACEMENT                            365,000
    28             (BASE CONSTRUCTION ALLOCATION -
    29             $300,000)
    30             (LAND ALLOCATION - $15,000)
    19990S0504B1471                 - 639 -

     1             (DESIGN AND CONTINGENCIES - $50,000)
     2         (17)  SR 2076, STEWARTSTOWN ROAD BRIDGE
     3             OVER DEER CREEK, HOPEWELL TOWNSHIP,
     4             BRIDGE REPLACEMENT                            227,000
     5             (BASE CONSTRUCTION ALLOCATION -
     6             $185,000)
     7             (LAND ALLOCATION - $10,000)
     8             (DESIGN AND CONTINGENCIES - $32,000)
     9         (18)  SR 2079, RED LION AVENUE OVER MUDDY
    10             CREEK, FELTON BOROUGH, BRIDGE
    11             REPLACEMENT                                   900,000
    12             (BASE CONSTRUCTION ALLOCATION -
    13             $750,000)
    14             (LAND ALLOCATION - $15,000)
    15             (DESIGN AND CONTINGENCIES - $135,000)
    16         (19)  SR 2002, MAIN STREET OVER MILL CREEK,
    17             YOE BOROUGH, REPLACE RETAINING WALL           105,000
    18             (BASE CONSTRUCTION ALLOCATION -
    19             $80,000)
    20             (LAND ALLOCATION - $1,000)
    21             (DESIGN AND CONTINGENCIES - $24,000)
    22         (20)  SR 3041, SINSHEIM ROAD BRIDGE OVER
    23             WEST BRANCH OF CODORUS CREEK, BRIDGE
    24             REPLACEMENT                                   365,000
    25             (BASE CONSTRUCTION ALLOCATION -
    26             $320,000)
    27             (DESIGN AND CONTINGENCIES - $45,000)
    28  Section 72.  Statewide.
    29     Construction of advanced wetland mitigation
    30  projects necessary to replace wetlands displaced
    19990S0504B1471                 - 640 -

     1  by bridge projects authorized under the act of
     2  December 8, 1982 (P.L.848, No.235), known as the
     3  Highway-Railroad and Highway Bridge Capital Budget
     4  Act for 1982-1983                                      3,100,000
     5             (Base Construction Allocation -
     6             $2,500,000)
     7             (Land Allocation - $350,000)
     8             (Design and Contingencies - $250,000)
     9  Section 72.1.  State forestry bridge projects itemized.           <--
    10     Projects in the category of State forestry bridge projects to
    11  be constructed by the Department of Conservation and Natural
    12  Resources, its successors or assigns, and to be financed by oil
    13  company franchise tax revenues pursuant to 75 Pa.C.S. §
    14  9502(a)(2)(iv) (relating to imposition of tax), are hereby
    15  itemized, together with their respective estimated costs, as
    16  follows:
    17     (a)  Local Bridges (Reserved)
    18     (b)  State Forestry Bridges
    19         (1)  Adams County
    20             (A)  Replacement of Bridge No.01-0005,
    21                 District Road Bridge over Carbaugh
    22                 Run                                       120,000
    23             (B)  Replacement of Bridge No.01-0004,
    24                 Dead Womans Hollow Road Bridge over
    25                 Mountain Creek                            150,000
    26         (2)  Bedford County
    27             (A)  Replacement of Bridge No.02-0002,
    28                 Wertz Road Bridge over Cove Creek         100,000
    29             (B)  Replacement of Bridge No.02-0001,
    30                 Wertz Road Bridge over Cove Creek         150,000
    19990S0504B1471                 - 641 -

     1         (3)  Cameron County
     2             (A)  Replacement of Bridge No.13-0012,
     3                 Brooks Run Road Bridge over Brooks
     4                 Road                                      220,000
     5             (B)  Replacement of Bridge No.13-0060,
     6                 Brooks State House Bridge over
     7                 Brooks Road                               250,000
     8             (C)  Replacement of Bridge No.13-0037,
     9                 Mix Run Road Bridge over Mix Run          200,000
    10             (D)  Replacement of Bridge No.13-0038,
    11                 Mix Run Road over Mix Run                 166,000
    12         (4)  Centre County
    13             (A)  Replacement of Bridge No.07-0010,
    14                 Siglerville Millheim Pike Bridge          162,000
    15             (B)  Replacement of Bridge No.07-0015,
    16                 Green Valley Road Bridge                  260,000
    17             (C)  Replacement of Bridge No.07-0033,
    18                 Pine Creek Road Bridge                    386,000
    19             (D)  Replacement of Bridge No.07-0045,
    20                 McCall Dam Road Bridge over White
    21                 Deer Creek                                180,000
    22             (E)  Replacement of Bridge No.09-0030,
    23                 Six Mile Run Bridge                       192,000
    24             (F)  Replacement of Bridge No.10-0028,
    25                 State Line Road Bridge                    196,000
    26             (G)  Replacement of Bridge No.05-0003,
    27                 Krise Valley Road Bridge over
    28                 Potter Run                                100,000
    29             (H)  Replacement of Bridge No.05-0004,
    30                 Bear Meadows Road Bridge over
    19990S0504B1471                 - 642 -

     1                 Sinking Creek                             100,000
     2             (I)  Replacement of Bridge No.05-0005,
     3                 Bear Meadows Road Bridge over
     4                 Galbraith Run                             150,000
     5             (J)  Replacement of Bridge No.07-0008,
     6                 Poe Valley Road Bridge over Big Poe
     7                 Creek                                     200,000
     8             (K)  Replacement of Bridge No.07-0028,
     9                 Cherry Run Road Bridge over Cherry
    10                 Run                                       102,000
    11             (L)  Replacement of Bridge No.07-0029,
    12                 Cherry Run Road Bridge over Cherry
    13                 Run                                       240,000
    14             (M)  Replacement of Bridge No.07-0035,
    15                 Stoney Run Road Bridge over Pine
    16                 Creek                                     375,000
    17             (N)  Replacement of Bridge No.09-0026,
    18                 Huckleberry Road Bridge over Black
    19                 Moshannon Creek                           250,000
    20             (O)  Replacement of Bridge No.09-0029,
    21                 Claymine Road Bridge over Six Mile
    22                 Run                                       200,000
    23             (P)  Replacement of Bridge No.10-0026,
    24                 Panther Road Bridge over Wolf Run         150,000
    25             (Q)  Replacement of Bridge No.07-0007,
    26                 Poe Paddy Drive Bridge over Big Poe
    27                 Creek                                     170,000
    28         (5)  Clearfield County
    29             (A)  Replacement of Bridge No.09-0005,
    30                 Tyler Road Bridge over Laurel Run         284,000
    19990S0504B1471                 - 643 -

     1             (B)  Replacement of Bridge No.09-0019,
     2                 Dent's Branch Road Bridge                 282,000
     3             (C)  Replacement of Bridge No.09-0022,
     4                 Merrill Road Bridge                       197,000
     5             (D)  Replacement of Bridge No.09-0012,
     6                 Little Medix Road Bridge over
     7                 Little Medix Run                          220,000
     8             (E)  Replacement of Bridge No.09-0013,
     9                 Little Medix Road Bridge over
    10                 Little Medix Run                          100,000
    11             (F)  Replacement of Bridge No.09-0014,
    12                 Little Medix Road Bridge over
    13                 Little Medix Run                          100,000
    14             (G)  Replacement of Bridge No.09-0015,
    15                 Little Medix Road Bridge over
    16                 Little Medix Run                          100,000
    17             (H)  Replacement of Bridge No.09-0018,
    18                 Dent's Branch Road Bridge over
    19                 Dent's Branch Street                      160,000
    20             (I)  Replacement of Bridge No.09-0020,
    21                 Dent's Branch Road Bridge over
    22                 Dent's Branch Street                      165,000
    23             (J)  Replacement of Bridge No.09-0021,
    24                 Ames Road Bridge over Deer Creek          145,000
    25             (K)  Replacement of Bridge No.09-0023,
    26                 Lost Run Road Bridge over Giffor
    27                 Run                                       138,000
    28             (L)  Replacement of Bridge No.09-0034,
    29                 Reservoir Road Bridge over Upper
    30                 Three Run                                 120,000
    19990S0504B1471                 - 644 -

     1         (6)  Clinton County
     2             (A)  Replacement of Bridge No.10-0033,
     3                 Cooks Run Road Bridge over Cooks
     4                 Run                                       110,000
     5             (B)  Replacement of Bridge No.10-0042,
     6                 Two Mile Road Bridge                      100,000
     7             (C)  Replacement of Bridge No.10-0043,
     8                 Big Basin Road Bridge over Shintown
     9                 Run                                       206,000
    10             (D)  Replacement of Bridge No.10-059,
    11                 Bridge over Right Branch of Young
    12                 Womans Creek Road                         287,000
    13             (E)  Replacement of Bridge No.10-0064,
    14                 Trout Run Bridge                          255,000
    15             (F)  Replacement of Bridge No.15-0021,
    16                 County Line Road Bridge                   167,000
    17             (G)  Replacement of Bridge No.10-0032,
    18                 Cooks Run Road Bridge over Crowley
    19                 Run                                       145,000
    20             (H)  Replacement of Bridge No.10-0044,
    21                 Robbins Road Bridge over Shintown
    22                 Run                                       120,000
    23             (I)  Replacement of Bridge No.10-0051,
    24                 Fork Hill Road Bridge over Lebo
    25                 Run                                       168,000
    26             (J)  Replacement of Bridge No.10-0052,
    27                 Left Branch Young Womans Road
    28                 Bridge over Mud Lick Run                  140,000
    29             (K)  Replacement of Bridge No.10-0053,
    30                 Left Branch Young Womans Road
    19990S0504B1471                 - 645 -

     1                 Bridge over Shingle Branch                145,000
     2             (L)  Replacement of Bridge No.10-0054,
     3                 Left Branch Young Womans Road
     4                 Bridge over Greenlick Run                 135,000
     5             (M)  Replacement of Bridge No.10-0057,
     6                 Sandy Run Road Bridge over Paddy
     7                 Run                                       140,000
     8             (N)  Replacement of Bridge No.10-0061,
     9                 Graham Road Bridge over Ferney Run        135,000
    10             (O)  Replacement of Bridge No.10-0063,
    11                 Hyner Run Road Bridge over Long
    12                 Fork                                      110,000
    13             (P)  Replacement of Bridge No.10-0035,
    14                 Bridge over Camp Run                      100,000
    15             (Q)  Replacement of Bridge No.10-0037,
    16                 Bridge over Cooks Run                     160,000
    17             (R)  Replacement of Bridge No.12-0032,
    18                 Gotshall Road Bridge over Gotshall
    19                 Run                                       120,000
    20             (S)  Replacement of Bridge No.10-0036,
    21                 over Rock Run                             150,000
    22             (T)  Replacement of Bridge No.07-0054,
    23                 Long Run                                   91,000
    24             (U)  Replacement of Bridge No.07-0055,
    25                 over Cooper Run                            70,000
    26             (V)  Replacement of Bridge No.10-0065,
    27                 Old Woods Road over Two Mile Run          100,000
    28         (7)  Cumberland County
    29             (A)  Replacement of Bridge No.01-0006,
    30                 Woodrow Road Run Bridge over
    19990S0504B1471                 - 646 -

     1                 Mountain Creek                            150,000
     2             (B)  Replacement of Bridge No.01-0010,
     3                 Milesburn Road Bridge                     102,000
     4             (C)  Replacement of Bridge No.01-0008,
     5                 Strohms Hollow Road Bridge over
     6                 Strohms Hollow Run                        138,000
     7             (D)  Replacement of Bridge No.01-0023,
     8                 Togg Run Road Bridge over Togg Run        138,000
     9         (8)  Dauphin County
    10             (A)  Replacement of Large Culvert,
    11                 White Oak Road Bridge over White
    12                 Oak Run                                   100,000
    13         (9)  Elk County
    14             (A)  Replacement of Bridge No.13-0040,
    15                 Red Run Road Bridge                       160,000
    16             (B)  Replacement of Bridge No.13-0049,
    17                 Shaffer Draft Road Bridge                 175,000
    18             (C)  Replacement of Bridge No.13-0050,
    19                 West Hicks Run Road Bridge                175,000
    20             (D)  Replacement of Bridge No.13-0052,
    21                 Bridge over East Branch of Hicks
    22                 Run                                       175,000
    23             (E)  Replacement of Bridge No.13-0053,
    24                 Bridge over East Branch of Hicks
    25                 Run                                       175,000
    26             (F)  Replacement of Bridge No.09-0006,
    27                 Blackwell Road Bridge over Laurel
    28                 Road                                      142,000
    29             (G)  Replacement of Bridge No.13-0028,
    30                 Porcupine Road Bridge over Dent's
    19990S0504B1471                 - 647 -

     1                 Run                                       183,000
     2             (H)  Replacement of Bridge No.13-0032,
     3                 Dent's Run Road Bridge over Little
     4                 Dent's Run                                110,000
     5             (I)  Replacement of Bridge No.13-0039,
     6                 Mix Run Road Bridge over Red Run          184,000
     7         (10)  Franklin County
     8             (A)  Replacement of Bridge No.01-0016,
     9                 Wirt Road Bridge                          147,000
    10             (B)  Replacement of Bridge No.01-0022,
    11                 Rattlesnake Run Road Bridge               149,000
    12             (C)  Replacement of Bridge No.01-0021,
    13                 Lindsay Lot Road Bridge over
    14                 Furnace Run                               100,000
    15             (D)  Replacement of Bridge No.01-0019,
    16                 Biesecker Gap Road Bridge over
    17                 Biesecker Run                             110,000
    18         (11)  Huntingdon County
    19             (A)  Replacement of Bridge No.05-0012,
    20                 Colerain Road Bridge                      235,000
    21             (B)  Replacement of Bridge No.05-0014,
    22                 Coopers Gap Road Bridge                   160,000
    23             (C)  Replacement of Bridge No.05-0021,
    24                 Stone Creek Road Bridge                   182,000
    25             (D)  Replacement of Bridge No.05-0027,
    26                 Diamond Valley Road Bridge over
    27                 Globe Run                                 100,000
    28             (E)  Replacement of Bridge No.05-0028,
    29                 Laurel Run Road Bridge                    213,000
    30             (F)  Replacement of Bridge No.05-0051,
    19990S0504B1471                 - 648 -

     1                 Coopers Gap Road Bridge                   174,000
     2             (G)  Replacement of Bridge No.05-0010,
     3                 Martin Road Bridge over Standing
     4                 Stone Creek                               173,000
     5             (H)  Replacement of Bridge No.05-0011,
     6                 Pennsylvania Furnace Road Bridge
     7                 over Globe Run                            140,000
     8             (I)  Replacement of Bridge No.05-0017,
     9                 Pine Swamp Road Bridge over Shaver
    10                 Creek                                     150,000
    11             (J)  Replacement of Bridge No.05-0018,
    12                 Beidler Road Bridge over Laurel
    13                 Run                                       142,000
    14             (K)  Replacement of Bridge No.05-0020,
    15                 Rag Hollow Road Bridge over East
    16                 Branch Stone Creek                        150,000
    17             (L)  Replacement of Bridge No.05-0026,
    18                 Pennsylvania Furnace Road Bridge
    19                 over Pennsylvania Furnace Run             110,000
    20             (M)  Replacement of Bridge No.05-0019,
    21                 Stone Creek Road over Detweiler
    22                 Run                                       200,000
    23             (N)  Replacement of Bridge No.05-0022,
    24                 Seeger Road over Stone Creek              200,000
    25         (12)  Jefferson County
    26             (A)  Replacement of Bridge No.08-0003,
    27                 Callen Run Road Bridge over Callen
    28                 Run                                       200,000
    29             (B)  Replacement of Bridge No.08-0001,
    30                 Corbett Road Bridge over Clear
    19990S0504B1471                 - 649 -

     1                 Creek                                     170,000
     2         (13)  Juniata County
     3             (A)  Replacement of Bridge No.03-0007,
     4                 Spectacle Gap Bridge                      158,000
     5             (B)  Replacement of Bridge No.03-0005,
     6                 East Licking Drive Bridge over East
     7                 Licking Creek                             242,000
     8             (C)  Replacement of Bridge No.03-0006,
     9                 East Licking Drive Bridge over East
    10                 Licking Creek                             222,000
    11         (13.1)  Lackawanna County
    12             (A)  Replacement of Bridge No.11-9000,
    13                 Sassafras Road over Spring Run             80,000
    14         (14)  Lycoming County
    15             (A)  Replacement of Bridge No.12-0015,
    16                 Rock Run Road Bridge                      175,000
    17             (B)  Replacement of Bridge No.12-0016,
    18                 Rock Run Road Bridge                      164,000
    19             (C)  Replacement of Bridge No.12-0019,
    20                 Little Bear Bridge                        193,000
    21             (D)  Replacement of Bridge No.12-0020,
    22                 Little Bear Bridge                        193,000
    23             (E)  Replacement of Bridge No.12-0021,
    24                 Little Bear Bridge                        193,000
    25             (F)  Replacement of Bridge No.12-0022,
    26                 Little Bear Creek Road Bridge             237,000
    27             (G)  Replacement of Bridge No.12-0028,
    28                 Fourth Gap Road Bridge                    100,000
    29             (H)  Replacement of Large Culvert,
    30                 Frances Road at Big Hollow                100,000
    19990S0504B1471                 - 650 -

     1             (I)  Replacement of Bridge No.12-0017,
     2                 Yellow Dog Road Bridge over Rock
     3                 Run                                       245,000
     4             (J)  Replacement of Bridge No.12-0040,
     5                 English Run Road Bridge over
     6                 English Run                               238,000
     7             (K)  Replacement of Bridge No.12-0046,
     8                 Morris Run Road Bridge over Slate
     9                 Run                                       240,000
    10             (L)  Replacement of Bridge No.12-0013,
    11                 Hillgrove Road Bridge over Pleasant
    12                 Stream                                    150,000
    13             (M)  Replacement of Bridge No.12-0027,
    14                 Cove Road Bridge over Fourth Gap          140,000
    15             (N)  Replacement of Bridge No.12-0023,
    16                 Little Bear Road Bridge over Little
    17                 Bear Creek                                120,000
    18             (O)  Replacement of Bridge No.12-0010,
    19                 Pleasant Stream Road over Bovier
    20                 Run                                       150,000
    21         (15)  Mifflin County
    22             (A)  Replacement of Bridge No.03-0008,
    23                 Spectacle Gap Road Bridge over East
    24                 Licking Creek                             150,000
    25             (B)  Replacement of Bridge No.07-0004,
    26                 Havice Valley Road Bridge over
    27                 Panther Run                               257,000
    28             (C)  Replacement of Bridge No.05-0051,
    29                 Cooper Gap Road Bridge over Cooper
    30                 Gap Run                                   172,000
    19990S0504B1471                 - 651 -

     1             (D)  Replacement of Bridge No.07-0057,
     2                 Stillhouse Hollow Road Bridge over
     3                 Greens Valley Street                      128,000
     4             (E)  Replacement of Bridge No.07-0003,
     5                 Havice Valley Road Bridge over
     6                 Swift Run                                 125,000
     7         (16)  Monroe County
     8             (A)  Replacement of Bridge No.19-0001,
     9                 Laurel Run Road Bridge                    159,000
    10         (17)  Perry County
    11             (A)  Replacement of Bridge No.03-0010,
    12                 Elk Hill Road Bridge                      152,000
    13             (B)  Replacement of Bridge No.03-0011,
    14                 Elk Hill Road Bridge                      152,000
    15             (C)  Replacement of Bridge No.03-0014,
    16                 Laurel Run Road Bridge over Laurel
    17                 Run, North Branch                         100,000
    18             (D)  Replacement of Bridge No.03-0015,
    19                 Sheaffer Run Bridge, Undermining at
    20                 South Abutment                            150,000
    21             (E)  Replacement of Bridge No.03-0016,
    22                 Laurel Run Road Bridge                    185,000
    23             (F)  Replacement of Bridge No.03-0018,
    24                 Twin Bridge over Laurel Run               180,000
    25             (G)  Replacement of Culvert, Shearer
    26                 Dug Box Culvert                           100,000
    27             (H)  Replacement of Culvert, Laurel Run
    28                 Road over Tributary of Laurel Run          60,000
    29         (18)  Pike County
    30             (A)  Replacement of Bridge No.19-0004,
    19990S0504B1471                 - 652 -

     1                 Pine Flats Run Road Bridge                160,000
     2             (B)  Replacement of Bridge No.19-0005,
     3                 Bruce Lake Road Bridge over
     4                 Tributary Egypt Meadow Lake               120,000
     5             (C)  Replacement of Bridge No.19-0803,
     6                 Bruce Lake Road Bridge over Egypt
     7                 Meadow Lake                               145,000
     8             (D)  Replacement of Bridge No.19-0002,
     9                 Hay Road Bridge over Middle Branch        115,000
    10         (19)  Potter County
    11             (A)  Replacement of Bridge No.15-0013,
    12                 Windfall Road Bridge                      160,000
    13             (B)  Replacement of Bridge No.15-0015,
    14                 Joerg Run Road Bridge                     160,000
    15             (C)  Replacement of Bridge No.15-0018,
    16                 Lebo Run Road Bridge                      160,000
    17             (D)  Replacement of Bridge No.15-0020,
    18                 Robinson Road Bridge                      230,000
    19             (E)  Replacement of Bridge No.15-0024,
    20                 Robinson Road Bridge                      140,000
    21             (F)  Replacement of Bridge No.16-0015,
    22                 Butternut Hollow Road Bridge over
    23                 Kettle Creek                              110,000
    24             (G)  Replacement of Bridge No.15-0003,
    25                 Jones Run Road Bridge over Freeman
    26                 Run                                       175,000
    27             (H)  Replacement of Bridge No.15-0010,
    28                 Black Diamond Road Bridge over Big
    29                 Moores Run                                163,000
    30             (I)  Replacement of Bridge No.15-0011,
    19990S0504B1471                 - 653 -

     1                 Horton Run Road Bridge over East
     2                 Fork Sinnemahoning Creek                  125,000
     3             (J)  Replacement of Bridge No.15-0014,
     4                 Hungry Hollow Road Bridge over
     5                 Cross Fork Creek                          192,000
     6             (K)  Replacement of Bridge No.15-0025,
     7                 Nelson Run Road Bridge over Big
     8                 Nelson Run                                138,000
     9             (L)  Replacement of Bridge No.15-0027,
    10                 Ellis Hollow Road Bridge over Nine
    11                 Mile Run                                  146,000
    12             (M)  Replacement of Bridge No.15-0012,
    13                 Bailey Run Bridge over Bailey Run         250,000
    14             (N)  Replacement of Bridge No.15-0019,
    15                 Twelve Mile Bridge over Spring
    16                 Brook                                     107,000
    17             (O)  Replacement of Bridge No.15-0013
    18                 over Windfall Run Road over
    19                 Windfall Run in Forest District
    20                 No.3                                      196,000
    21             (P)  Replacement of Bridge No.15-0015
    22                 over Joerg Run Road over Joerg Run
    23                 in Forest District No.3                   135,000
    24             (Q)  Replacement of Bridge No.15-0018
    25                 over Lebo Road over Lebo Run in
    26                 Forest District No.3                      148,000
    27         (20)  Schuykill County
    28             (A)  Replacement of Bridge No.18-0003,
    29                 Panther Road Bridge over Panther
    30                 Creek                                      80,000
    19990S0504B1471                 - 654 -

     1         (21)  Snyder County
     2             (A)  Replacement of Bridge No.07-0025,
     3                 Swift Run Road Bridge over Swift
     4                 Run                                       138,000
     5         (22)  Somerset County
     6             (A)  Replacement of Bridge No.04-0002,
     7                 Blue Hole Road Bridge                     192,000
     8             (B)  Replacement of Bridge No.04-0008,
     9                 Cole Run Road Bridge                      138,000
    10             (C)  Replacement of Bridge No.04-0004,
    11                 South Wolf Run Road Bridge over Tub
    12                 Mill Run                                  184,000
    13             (D)  Replacement of Bridge No.04-0006,
    14                 Jones Mill Run Road Bridge over
    15                 Jones Mill Run                            140,000
    16             (E)  Replacement of Bridge No.06-0002,
    17                 State Forest Road Bridge over
    18                 Tributary to Roaring Fork                  82,000
    19             (F)  Replacement of Bridge No.06-0004,
    20                 Shade Road Bridge over Mile Run           131,000
    21         (23)  Sullivan County
    22             (A)  Replacement of Bridge No.20-0002,
    23                 Brunnerdale Road Bridge                   220,000
    24             (B)  Replacement of Bridge No.20-0008,
    25                 Shanerburg Road Bridge                    212,000
    26             (C)  Replacement of Bridge No.20-0011,
    27                 Shanerburg Road Bridge over
    28                 Shanerburg Run                            110,000
    29             (D)  Replacement of Bridge No.20-0004,
    30                 Mill Creek Road Bridge over Mill
    19990S0504B1471                 - 655 -

     1                 Creek                                     135,000
     2             (E)  Replacement of Bridge No.20-0005,
     3                 Mill Creek Road Bridge over Mill
     4                 Creek                                     100,000
     5         (24)  Tioga County
     6             (A)  Replacement of Bridge No.16-0004,
     7                 Left Asaph Road Bridge                    248,000
     8             (B)  Replacement of Bridge No.16-0005,
     9                 Asaph Run Bridge                          414,000
    10             (C)  Replacement of Bridge No.16-0010,
    11                 Painter Leetonia Road Bridge              170,000
    12             (D)  Replacement of Bridge No.16-0011,
    13                 Cedar Run Bridge                          170,000
    14             (E)  Replacement of Bridge No.16-0020,
    15                 Mine Hole Road Bridge                     107,000
    16             (F)  Replacement of Bridge No.16-0003,
    17                 Left Asaph Road Bridge over Left
    18                 Asaph Run                                 186,000
    19             (G)  Replacement of Bridge No.16-0008,
    20                 Owasse Road Bridge over Chimney
    21                 Hollow                                    120,000
    22             (H)  Replacement of Bridge No.16-0015,
    23                 Butternut Hollow Road Bridge over
    24                 Kettle Creek                              145,000
    25             (I)  Replacement of Bridge No.12-0049,
    26                 Francis Road Bridge over Francis
    27                 Branch                                    150,000
    28             (J)  Replacement of Bridge No.16-0016,
    29                 Bear Run Road Bridge over Cushman
    30                 Branch                                    160,000
    19990S0504B1471                 - 656 -

     1             (K)  Replacement of Bridge No.16-0018,
     2                 Mine Hole Road Bridge over Mine
     3                 Hole Run                                  150,000
     4             (L)  Replacement of Bridge No.12-0002,
     5                 Left Asaph over Baker Branch              200,000
     6             (M)  Replacement of Bridge No.16-0019,
     7                 Mine Hole Road over East Mine Hole
     8                 Run                                       150,000
     9         (25)  Union County
    10             (A)  Replacement of Bridge No.07-0016,
    11                 Hoofnagle Road Bridge                     235,000
    12             (B)  Replacement of Bridge No.07-0017,
    13                 Weikert Run Road Bridge                   235,000
    14             (C)  Replacement of Bridge No.07-0047,
    15                 White Deer Creek Road Bridge              234,000
    16             (D)  Replacement of Bridge No.07-0046,
    17                 Cooper Mill Road Bridge over White
    18                 Deer Creek                                212,000
    19             (E)  Replacement of Bridge No.07-0048,
    20                 White Deer Creek Road Bridge over
    21                 White Deer Creek                          235,000
    22             (F)  Replacement of Bridge No.07-0041,
    23                 Brandon Road Bridge over North
    24                 Branch of Buffalo Creek                   107,000
    25             (G)  Replacement of Bridge No.07-0040,
    26                 Pine Creek Road Bridge over Rapid
    27                 Run                                       165,000
    28         (26)  Westmoreland County
    29             (A)  Replacement of Bridge No.04-0011,
    30                 Linn Run Road Bridge over Linn Run        125,000
    19990S0504B1471                 - 657 -

     1             (B)  Replacement of Bridge No.04-0012,
     2                 Linn Run Road Bridge over Rock Run        135,000
     3  Section 72.2.  State park bridge projects itemized.
     4     Projects in the category of State park bridge projects to be
     5  constructed by the Department of Conservation and Natural
     6  Resources, its successors or assigns, and to be financed by oil
     7  company franchise tax revenues pursuant to 75 Pa.C.S. §
     8  9502(a)(2)(iv) (relating to imposition of tax), are hereby
     9  itemized, together with their respective estimated costs, as
    10  follows:
    11     (a)  Local Bridges (Reserved)
    12     (b)  State Park Bridges
    13         (1)  Beaver County
    14             (A)  Replacement of Bridge No.13-1200
    15                 over Valley Road End in Raccoon
    16                 Creek State Park                          100,000
    17             (B)  Replacement of Bridge No.13-1201
    18                 over Valley Road Entrance in
    19                 Raccoon Creek State Park                  250,000
    20             (C)  Replacement of Bridge No.13-1203
    21                 over Mineral Springs Road in
    22                 Raccoon Creek State Park                  122,000
    23             (D)  Replacement of Bridge No.13-1204
    24                 over Service Yard in Raccoon Creek
    25                 State Park                                109,000
    26             (E)  Replacement of Bridge No.13-1206
    27                 over Main Road West of Office in
    28                 Raccoon Creek State Park                  370,000
    29             (F)  Replacement of Bridge No.13-1209
    30                 over Main Road Near W.T. Plant in
    19990S0504B1471                 - 658 -

     1                 Raccoon Creek State Park                  480,000
     2         (2)  Bedford County
     3             (A)  Replacement of Bridge No.02-0101
     4                 over Whysong Bridge in Blue Knob
     5                 State Park                                120,000
     6             (B)  Replacement of Bridge No.02-0103
     7                 over Camp No.2 Bridge in Blue Knob
     8                 State Park                                109,000
     9             (C)  Replacement of Bridge No.02-0108
    10                 over Camp No.1 Service Road in Blue
    11                 Knob State Park                           100,000
    12             (D)  Replacement of Bridge No.02-0109
    13                 over No.1 Campground in Blue Knob
    14                 State Park                                 85,000
    15             (E)  Replacement of Bridge No.02-0110
    16                 over Service Road in Blue Knob
    17                 State Park                                100,000
    18         (3)  Berks County
    19             (A)  Replacement of Bridge No.06-0400
    20                 over Lenape Trail Bridge in French
    21                 Creek State Park                          120,000
    22             (B)  Replacement of Bridge No.06-0402
    23                 over Scotts Run Lake South in
    24                 French Creek State Park                   120,000
    25             (C)  Replacement of Bridge No.11-0701
    26                 over Forester Road in Nolde Forest
    27                 E.E.C.                                    125,000
    28             (D)  Replacement of Bridge No.11-0702
    29                 over Forester Road in Nolde Forest
    30                 E.E.C.                                    110,000
    19990S0504B1471                 - 659 -

     1             (E)  Replacement of Bridge No.11-0703
     2                 over Boulevard Trail in Nolde
     3                 Forest E.E.C.                             135,000
     4             (F)  Replacement of Bridge No.11-0704
     5                 over Watershed Trail in Nolde
     6                 Forest E.E.C.                             109,000
     7             (G)  Replacement of Bridge No.11-0705
     8                 over Cabin Hollow Road in Nolde
     9                 Forest E.E.C.                             109,000
    10         (4)  Blair County
    11             (A)  Replacement of Bridge No.18-0300
    12                 over Pump House in Canoe Creek
    13                 State Park                                130,000
    14         (5)  Bucks County
    15             (A)  Replacement of Bridge No.16-0900
    16                 over State Park Road in Ralph
    17                 Stover State Park                         275,000
    18             (B)  Replacement of Bridge No.22-0600
    19                 over Service Road S.E. to Lake in
    20                 Nockamixon State Park                     100,000
    21             (C)  Replacement of Bridge No.22-0601
    22                 over Park Service Road (S.E. Lake)
    23                 in Nockamixon State Park                  109,000
    24             (D)  Replacement of Bridge No.22-0602
    25                 over Park Service Road in
    26                 Nockamixon State Park                     100,000
    27             (E)  Replacement of Bridge No.25-1201
    28                 over No.1 Lane Trail Bridge in
    29                 Tyler State Park                          100,000
    30             (F)  Replacement of Bridge No.25-1202
    19990S0504B1471                 - 660 -

     1                 over Mill Dairy Trail Bridge in
     2                 Tyler State Park                          109,000
     3             (G)  Replacement of Bridge No.25-1203
     4                 over Mill Dairy Trail Bridge in
     5                 Tyler State Park                          109,000
     6             (H)  Replacement of Bridge No.25-1206
     7                 over Dairy Hill Trail Bridge in
     8                 Tyler State Park                          109,000
     9             (I)  Replacement of Bridge No.25-1207
    10                 over No.1 Lake Trail Bridge in
    11                 Tyler State Park                          109,000
    12             (J)  Replacement of Bridge No.25-1208
    13                 over No.1 Lane Trail Entrance in
    14                 Tyler State Park                          115,000
    15             (K)  Replacement of Bridge No.25-1210
    16                 over Biaker 2 Bridge in Tyler State
    17                 Park                                      250,000
    18             (L)  Replacement of Bridge No.25-1211
    19                 over Canoe Bridge Boat House in
    20                 Tyler State Park                          225,000
    21             (M)  Replacement of Bridge No.50-0569
    22                 over Mill Creek Waste Gate in
    23                 Delaware Canal State Park                 120,000
    24             (N)  Replacement of Bridge No.50-1017
    25                 over Waste Gate in Delaware Canal
    26                 State Park                                110,000
    27             (O)  Replacement of Bridge No.50-1469
    28                 over Dr. Summers Bridge in Delaware
    29                 Canal State Park                          225,000
    30             (P)  Replacement of Bridge No.50-1523
    19990S0504B1471                 - 661 -

     1                 over Waste Gate Woodside Avenue in
     2                 Delaware Canal State Park                 100,000
     3             (Q)  Replacement of Bridge No.50-1594
     4                 over Mt. Eyre Waste Gate in
     5                 Delaware Canal State Park                 120,000
     6             (R)  Replacement of Bridge No.50-1609
     7                 over Mt. Eyre Road Bridge in
     8                 Delaware Canal State Park                 250,000
     9             (S)  Replacement of Bridge No.50-1634
    10                 over Milk House Camelback in
    11                 Delaware Canal State Park                 250,000
    12             (T)  Replacement of Bridge No.50-1668
    13                 over Goat Farm Bridge in Delaware
    14                 Canal State Park                          250,000
    15             (U)  Replacement of Bridge No.50-1912
    16                 over Buckstone Davids Library in
    17                 Delaware Canal State Park                 250,000
    18             (V)  Replacement of Bridge No.50-2145
    19                 over Rossiters Bridge in Delaware
    20                 Canal State Park                          250,000
    21             (W)  Replacement of Bridge No.50-2181
    22                 over Bowmans Hill Waste Gate in
    23                 Delaware Canal State Park                 200,000
    24             (X)  Replacement of Bridge No.50-2374
    25                 over Middle Union Mill Bridge in
    26                 Delaware Canal State Park                 250,000
    27             (Y)  Replacement of Bridge No.50-2399
    28                 over Outlet Lock Bridge in Delaware
    29                 Canal State Park                          165,000
    30             (Z)  Replacement of Bridge No.50-2423
    19990S0504B1471                 - 662 -

     1                 over Dark Hollow Run Overflow in
     2                 Delaware Canal State Park                 180,000
     3             (AA)  Replacement of Bridge No.50-2424
     4                 over Waste Gate Dark Hollow in
     5                 Delaware Canal State Park                 112,000
     6             (BB)  Replacement of Bridge No.50-2470
     7                 over Ferry Street Bridge in
     8                 Delaware Canal State Park                 300,000
     9             (CC)  Replacement of Bridge No.50-2613
    10                 over Phillips Mill Bridge in
    11                 Delaware Canal State Park                 250,000
    12             (DD)  Replacement of Bridge No.50-2682
    13                 over Lower Limeport Bridge in
    14                 Delaware Canal State Park                 250,000
    15             (EE)  Replacement of Bridge No.50-2721
    16                 over Upper Limeport Bridge in
    17                 Delaware Canal State Park                 250,000
    18             (FF)  Replacement of Bridge No.50-2802
    19                 over Redfield Bridge in Delaware
    20                 Canal State Park                          250,000
    21             (GG)  Replacement of Bridge No.50-2896
    22                 over Virginia Forest in Delaware
    23                 Canal State Park                          250,000
    24             (HH)  Replacement of Bridge No.50-3047
    25                 over Waste Gate over Lumberville in
    26                 Delaware Canal State Park                 109,000
    27             (II)  Replacement of Bridge No.50-3100
    28                 over Lock 12 Bypass in Delaware
    29                 Canal State Park                          100,000
    30             (JJ)  Replacement of Bridge No.50-3101
    19990S0504B1471                 - 663 -

     1                 over Lumberville Lock 12 in
     2                 Delaware Canal State Park                 150,000
     3             (KK)  Replacement of Bridge No.50-3206
     4                 over Waste Gate in Delaware Canal
     5                 State Park                                112,000
     6             (LL)  Replacement of Bridge No.50-3235
     7                 over Waste Gate at Lock 13 in
     8                 Delaware Canal State Park                 120,000
     9             (MM)  Replacement of Bridge No.50-3236
    10                 over Lock 13 Lock Bridge in
    11                 Delaware Canal State Park                 120,000
    12             (NN)  Replacement of Bridge No.50-3254
    13                 over Waste Gate Whites Up Lock in
    14                 Delaware Canal State Park                 125,000
    15             (OO)  Replacement of Bridge No.50-3394
    16                 over Smithtown Bridge 2 in Delaware
    17                 Canal State Park                          125,000
    18             (PP)  Replacement of Bridge No.50-3517
    19                 over Smithtown Bridge 3 in Delaware
    20                 Canal State Park                          200,000
    21             (QQ)  Replacement of Bridge NO.50-3557
    22                 over Waste Gate Kennys Lock in
    23                 Delaware Canal State Park                 160,000
    24             (RR)  Replacement of Bridge No.50-3587
    25                 over Smithtown Bridge 5 in Delaware
    26                 Canal State Park                          225,000
    27             (SS)  Replacement of Bridge No.50-3617
    28                 over Lock 17 Stop Gate in Delaware
    29                 Canal State Park                          140,000
    30             (TT)  Replacement of Bridge No.50-3618
    19990S0504B1471                 - 664 -

     1                 over Lock 17 Bypass Gate in
     2                 Delaware Canal State Park                 120,000
     3             (UU)  Replacement of Bridge No.50-3681
     4                 over Dark Hollow Waste Gate Bridge
     5                 in Delaware Canal State Park              140,000
     6             (VV)  Replacement of Bridge No.50-3718
     7                 over Tinicum Vehicle Bridge in
     8                 Delaware Canal State Park                 160,000
     9             (WW)  Replacement of Bridge No.50-3736
    10                 over Overwrekks Waste Gate Bridge
    11                 in Delaware Canal State Park              140,000
    12             (XX)  Replacement of Bridge No.50-3925
    13                 over Dr. Dautzeig Bridge in
    14                 Delaware Canal State Park                 120,000
    15             (YY)  Replacement of Bridge No.50-3939
    16                 over Farley Waste Gate in Delaware
    17                 Canal State Park                          100,000
    18             (ZZ)  Replacement of Bridge No.50-4131
    19                 over Hazzard Camelback Bridge in
    20                 Delaware Canal State Park                 250,000
    21             (AAA)  Replacement of Bridge No.50-4182
    22                 over Lodi Waste Gate Bridge in
    23                 Delaware Canal State Park                 160,000
    24             (BBB)  Replacement of Bridge No.50-4236
    25                 over Sphars Camelback Bridge in
    26                 Delaware Canal State Park                 250,000
    27             (CCC)  Replacement of Bridge No.50-4270
    28                 over Gottlieb Bridge in Delaware
    29                 Canal State Park                          250,000
    30             (DDD)  Replacement of Bridge No.50-4300
    19990S0504B1471                 - 665 -

     1                 over Dillieo Bridge in Delaware
     2                 Canal State Park                          250,000
     3             (EEE)  Replacement of Bridge No.50-4488
     4                 over Clark's Quarry Bridge in
     5                 Delaware Canal State Park                 220,000
     6             (FFF)  Replacement of Bridge No.50-4565
     7                 over Overpeck's Bridge in Delaware
     8                 Canal State Park                          250,000
     9             (GGG)  Replacement of Bridge No.50-4583
    10                 over Narrowsville Waste Gate in
    11                 Delaware Canal State Park                 130,000
    12             (HHH)  Replacement of Bridge No.50-4673
    13                 over Lock 20 Bridge in Delaware
    14                 Canal State Park                          160,000
    15             (III)  Replacement of Bridge No.50-4787
    16                 over Nicholas Bridge in Delaware
    17                 Canal State Park                          250,000
    18             (JJJ)  Replacement of Bridge No.50-4860
    19                 over Trauger's Steel Camelback in
    20                 Delaware Canal State Park                 250,000
    21             (KKK)  Replacement of Bridge No.50-4922
    22                 over Lock 21 Stop Gate in Delaware
    23                 Canal State Park                          140,000
    24         (6)  Cambria County
    25             (A)  Replacement of Bridge No.11-1100
    26                 over Beaver Dam Run (Spillway) in
    27                 Prince Gallitzin State Park               300,000
    28         (7)  Cameron County
    29             (A)  Replacement of Bridge No.23-1303
    30                 over Norcross Run in Sinnemahoning
    19990S0504B1471                 - 666 -

     1                 State Park                                135,000
     2             (B)  Replacement of Bridge No.24-1401
     3                 over West Cowley Run in Sizerville
     4                 State Park                                120,000
     5         (8)  Carbon County
     6             (A)  Replacement of Bridge No.09-0501
     7                 over Section Bridge in Hickory Run
     8                 State Park                                135,000
     9             (B)  Replacement of Bridge No.09-0502
    10                 over Disposal Plant Bridge in
    11                 Hickory Run State Park                    132,000
    12             (C)  Replacement of Bridge No.09-0503
    13                 over Boulder Field Road Bridge in
    14                 Hickory Run State Park                    130,000
    15             (D)  Replacement of Bridge No.09-0504
    16                 over Swimming Pool Bridge in
    17                 Hickory Run State Park                    136,000
    18             (E)  Replacement of Bridge No.33-0100
    19                 over Oldmill Road/Sawmill Run in
    20                 Beltzville State Park                     120,000
    21             (F)  Replacement of Bridge No.35-1400
    22                 over Lehigh Gorge State Park in
    23                 Lehigh Gorge State Park                   250,000
    24         (9)  Centre County
    25             (A)  Replacement of Bridge No.18-0900
    26                 over Main Park Road in Poe Valley
    27                 State Park                                224,000
    28             (B)  Replacement of Bridge No.22-0900
    29                 over Camping Bridge in Greenwood
    30                 Furnace State Park                        140,000
    19990S0504B1471                 - 667 -

     1         (10)  Clearfield County
     2             (A)  Replacement of Bridge No.17-0801
     3                 over Campground Road in Parker Dam
     4                 State Park                                220,000
     5         (11)  Clinton County
     6             (A)  Replacement of Bridge No.10-0600
     7                 over Main Park Road Entrance in
     8                 Hyner Run State Park                      240,000
     9             (B)  Replacement of Bridge No.10-0601
    10                 over Hyner Run Road in Hyner Run
    11                 State Park                                140,000
    12         (12)  Crawford County
    13             (A)  Replacement of Bridge No.26-1102
    14                 over Dam Overflow Bridge in
    15                 Pymatuning State Park                   1,000,000
    16             (B)  Replacement of Bridge No.26-1103
    17                 over Dam Spillway Bridge in
    18                 Pymatuning State Park                   1,539,000
    19         (13)  Cumberland County
    20             (A)  Replacement of Bridge No.10-1000
    21                 over Fuller Lake Dam Breast in Pine
    22                 Grove Furnace State Park                  135,000
    23         (14)  Delaware County
    24             (A)  Replacement of Bridge No.27-1100
    25                 over South of Pa.3 Entrance in
    26                 Ridley Creek State Park                   140,000
    27             (B)  Replacement of Bridge No.27-1104
    28                 over Sycamore Mills Road in Park in
    29                 Ridley Creek State Park                   130,000
    30         (15)  Erie County
    19990S0504B1471                 - 668 -

     1             (A)  Replacement of Bridge No.20-1000
     2                 over Lagoon Bridge in Presque Isle
     3                 State Park                              1,500,000
     4             (B)  Replacement of Bridge No.20-1101
     5                 over Misery BSY Bridge in Presque
     6                 Isle State Park                         1,500,000
     7         (16)  Fayette County
     8             (A)  Replacement of Bridge No.11-0901
     9                 over Brunner Run Bridge in Ohiopyle
    10                 State Park                              1,000,000
    11         (17)  Franklin County
    12             (A)  Replacement of Bridge No.03-0201
    13                 over Main Entrance Road in
    14                 Caledonia State Park                      120,000
    15             (B)  Replacement of Bridge No.03-0202
    16                 over Main Entrance Road in
    17                 Caledonia State Park                      200,000
    18             (C)  Replacement of Bridge No.23-0180
    19                 over End of Main Park Road in
    20                 Buchanan's Birthplace State Park          175,000
    21         (18)  Fulton County
    22             (A)  Replacement of Bridge No.05-0500
    23                 over Main Park Road in Cowan's Gap
    24                 State Park                                190,000
    25         (19)  Greene County
    26             (A)  Replacement of Bridge No.14-1300
    27                 over Iron Bridge Trail in Ryerson
    28                 Station State Park                        500,000
    29         (20)  Huntingdon County
    30             (A)  Replacement of Bridge No.14-1300
    19990S0504B1471                 - 669 -

     1                 over Upper Picnic Area in Trough
     2                 Creek State Park                          334,000
     3         (21)  Luzerne County
     4             (A)  Replacement of Bridge No.17-1001
     5                 over Bridge No.2 Kitchen Creek in
     6                 Ricketts Glen State Park                  130,000
     7         (22)  Lycoming County
     8             (A)  Replacement of Bridge No.14-0700
     9                 over Campground Road in Little Pine
    10                 State Park                                424,000
    11         (23)  Mifflin County
    12             (A)  Replacement of Bridge No.21-1200
    13                 over Jack's Mountain Road in Reeds
    14                 Gap State Park                            176,000
    15             (B)  Replacement of Bridge No.21-1201
    16                 over Service Road in Reeds Gap
    17                 State Park                                100,000
    18         (24)  Montgomery County
    19             (A)  Replacement of Bridge No.34-1601
    20                 over Driveway in Evansburg State
    21                 Park                                      120,000
    22             (B)  Replacement of Bridge No.34-1602
    23                 over Service Road Bridge in
    24                 Evansburg State Park                      175,000
    25             (C)  Replacement of Bridge No.52-1500
    26                 over High Arch Bridge in Norristown
    27                 Farm Park                                 625,000
    28             (D)  Replacement of Bridge No.52-1501
    29                 over Meadow Bridge in Norristown
    30                 Farm Park                                 500,000
    19990S0504B1471                 - 670 -

     1             (E)  Replacement of Bridge No.52-1502
     2                 over Lower Farm Road Bridge No.2 in
     3                 Norristown Farm Park                      700,000
     4             (F)  Replacement of Bridge No.52-1503
     5                 over Lower Farm Road/Piggery Road
     6                 in Norristown Farm Park                   125,000
     7             (G)  Replacement of Bridge No.52-1504
     8                 over Lower Farm Road/Stony Road in
     9                 Norristown Farm Park                    1,500,000
    10             (H)  Replacement of Bridge No.52-1506
    11                 over Stanbridge Street Extension in
    12                 Norristown Farm Park                      700,000
    13             (I)  Replacement of Bridge No.52-1507
    14                 over Small Railroad Bridge in
    15                 Norristown Farm Park                      140,000
    16         (25)  Northampton County
    17             (A)  Replacement of Bridge No.07-0000
    18                 over Henry Homestead Bridge in
    19                 Jacobsburg E. E. Center                   120,000
    20             (B)  Replacement of Bridge No.50-5135
    21                 over Rocky Falls Waste Gate in
    22                 Delaware Canal State Park                 120,000
    23             (C)  Replacement of Bridge No.50-5371
    24                 over Raubsville P./S. Bridge in
    25                 Delaware Canal State Park                 200,000
    26             (D)  Replacement of Bridge No.50-5417
    27                 over Raubsville Camelback Bridge in
    28                 Delaware Canal State Park                 200,000
    29             (E)  Replacement of Bridge No.50-5472
    30                 over Browns Terrace Bridge in
    19990S0504B1471                 - 671 -

     1                 Delaware Canal State Park                 200,000
     2             (F)  Replacement of Bridge No.50-5657
     3                 over Stop Gate Bridge 56.570 in
     4                 Delaware Canal State Park                 250,000
     5             (G)  Replacement of Bridge No.50-5887
     6                 over Lock 24 East in Delaware Canal
     7                 State Park                                160,000
     8             (H)  Replacement of Bridge No.50-5888
     9                 over Lock 24 Bridge in Delaware
    10                 Canal State Park                          160,000
    11             (I)  Replacement of Bridge No.50-5889
    12                 over Lock 24 West in Delaware Canal
    13                 State Park                                160,000
    14         (26)  Perry County
    15             (A)  Replacement of Bridge No.17-0803
    16                 over Maintenance Road in Little
    17                 Buffalo State Park                        120,000
    18         (27)  Pike County
    19             (A)  Replacement of Bridge No.14-0800
    20                 over Big Inlet in Promised Land
    21                 State Park                                130,000
    22             (B)  Replacement of Bridge No.14-0802
    23                 over Lower Lake Road in Promised
    24                 Land State Park                         1,000,000
    25         (28)  Somerset County
    26             (A)  Replacement of Bridge No.06-0400
    27                 over Main Road Bridge No.1 in
    28                 Kooser State Park                         130,000
    29             (B)  Replacement of Bridge No.06-0401
    30                 over Main Road Bridge No.2 in
    19990S0504B1471                 - 672 -

     1                 Kooser State Park                         130,000
     2             (C)  Replacement of Bridge No.06-0402
     3                 over Van Dyke Picnic Area in Kooser
     4                 State Park                                120,000
     5             (D)  Replacement of Bridge No.07-0503
     6                 over Main Road Forge Bridge No.1 in
     7                 Laurel Hill State Park                    500,000
     8             (E)  Replacement of Bridge No.07-0505
     9                 over Main Road Jones Bridge No.2 in
    10                 Laurel Hill State Park                    300,000
    11         (29)  Tioga County
    12             (A)  Replacement of Bridge No.09-0500
    13                 over Hills Creek Lake in Hills
    14                 Creek State Park                          400,000
    15         (30)  Union County
    16             (A)  Replacement of Bridge No.20-1000
    17                 over Service Road to Beach in R.B.
    18                 Winter State Park                         120,000
    19         (31)  Westmoreland County
    20             (A)  Replacement of Bridge No.05-0300
    21                 over Main Picnic Area in Keystone
    22                 State Park                                100,000
    23             (B)  Replacement of Bridge No.08-0700
    24                 over Adams Falls Picnic Area in
    25                 Linn Run State Park                       140,000
    26             (C)  Replacement of Bridge No.08-0701
    27                 over Cabins 9 and 10 Access Road in
    28                 Linn Run State Park                       160,000
    29  Section 72.3 72.1.  Statewide bicycle and pedestrian structures.  <--
    30     Rehabilitation, construction and demolition of
    19990S0504B1471                 - 673 -

     1  bridges and other crossing structures on bicycle
     2  and pedestrian ways to be identified by the
     3  Department of Conservation and Natural Resources       5,000,000
     4  Section 73.  Limitation on expenditure of funds.
     5     Any moneys derived from the incurring of debt shall be used
     6  solely for effecting the rehabilitation, replacement or removal
     7  of bridges located on State highways or State forestry bridges.   <--
     8  All other bridge rehabilitation, replacement or removal shall be
     9  financed and State bridge or State forestry bridge                <--
    10  rehabilitation, replacement or removal may also be financed from
    11  current revenue.
    12  Section 74.  Debt authorization.
    13     The Governor, Auditor General and State Treasurer are hereby
    14  authorized and directed to borrow from time to time, in addition
    15  to any authorization heretofore or hereafter enacted, on the
    16  credit of the Commonwealth, subject to the limitations provided
    17  in the current capital budget, money not exceeding in the
    18  aggregate the sum of $2,092,894,000 $2,251,049,000 as may be      <--
    19  found necessary to carry out the acquisition and construction of
    20  the State projects specifically itemized in this act.
    21  Section 75.  Issue of bonds.
    22     The indebtedness authorized in this act shall be incurred
    23  from time to time and shall be evidenced by one or more series
    24  of general obligation bonds of the Commonwealth in such
    25  aggregate principal amount for each series as the Governor,
    26  Auditor General and State Treasurer shall determine, but the
    27  latest stated maturity date shall not exceed 30 years from the
    28  date of the bond first issued for each series.
    29  Section 76.  Estimated useful life of projects.
    30     The General Assembly states the estimated useful life of the
    19990S0504B1471                 - 674 -

     1  projects itemized in this act as 30 years.
     2  Section 77.  Appropriation.
     3     The net proceeds of the sale of the obligations authorized in
     4  this act are hereby appropriated from the Capital Facilities
     5  Fund to the department in the maximum amount of $2,092,894,000    <--
     6  $2,251,049,000 to be used by it exclusively to defray the         <--
     7  financial costs of the State projects specifically itemized in
     8  this capital budget. After reserving or paying the expenses of
     9  the sale of the obligation, the State Treasurer shall pay out to
    10  the department the moneys as required and certified by it to be
    11  legally due and payable.
    12  Section 78.  Federal funds.
    13     In addition to those funds appropriated in section 77, all
    14  moneys received from the Federal Government for the public
    15  improvement projects specifically itemized in this act are also
    16  hereby appropriated for those projects.
    17  Section 79.  Allocation of funds.
    18     (a)  General rule.--Whenever the department or the Department
    19  of Conservation and Natural Resources determines that the full
    20  estimated financial costs of the projects itemized in this act
    21  are not necessary for the proper design, acquisition or
    22  construction of such projects, the excess funds no longer
    23  required may be allocated by the department or the Department of
    24  Conservation and Natural Resources to increase the estimated
    25  costs of any one or more of the projects specifically itemized
    26  in a capital budget.
    27     (b)  Reimbursement of municipal expenditures.--Moneys raised
    28  or expended by municipalities after the effective date of this
    29  act, in anticipation of receipt of funds authorized for projects
    30  itemized by this act, may be reimbursable to those
    19990S0504B1471                 - 675 -

     1  municipalities.
     2  Section 80.  Policy on jobs and materials.
     3     (a)  Jobs.--It is the declared policy of the Commonwealth
     4  that the construction projects authorized in this act be used,
     5  to the greatest extent possible, to provide for the creation of
     6  jobs and the rehiring of the unemployed in this Commonwealth. In
     7  order to reach this goal, firms with Commonwealth-based
     8  facilities shall be actively solicited to make bids on contracts
     9  to furnish products and materials, including, but not limited
    10  to, steel and steel products, to be used in these projects.
    11     (b)  Materials.--Every contract document entered into to
    12  undertake a project contained in this act shall provide that any
    13  steel or other products to be used or supplied in the
    14  performance of this contract shall be required to be
    15  manufactured by plants in the United States unless the secretary
    16  determines, on a contract by contract basis, that certain
    17  required products are not produced in the United States in
    18  sufficient quantities to meet the requirements of the contract.
    19  Such a determination and the reasons therefor shall be published
    20  in the Pennsylvania Bulletin. Decisions made under this
    21  subsection shall not be inconsistent with the general provisions
    22  of the act of March 3, 1978 (P.L.6, No.3), known as the Steel
    23  Products Procurement Act.
    24     (c)  Minorities and women.--It is also the declared policy of
    25  the Commonwealth to require and encourage substantial
    26  participation by minorities and women in the construction
    27  projects authorized by this act.
    28  Section 81.  Payment of capital debt service.
    29     The repayment of any debt incurred pursuant to this act shall
    30  be made from the account and such repayment shall have first
    19990S0504B1471                 - 676 -

     1  claim on the revenues of the account.
     2  Section 82.  Authorization and debt cumulation.
     3     The additional authorization and debt allowance provided for
     4  in this act shall be added to the total authorizations and debt
     5  incurred pursuant to the act of December 8, 1982 (P.L.848,
     6  No.235), known as the Highway-Railroad and Highway Bridge
     7  Capital Budget Act for 1982-1983, as amended and supplemented.
     8  Section 83.  Editorial changes.
     9     In editing and preparing this act for printing following the
    10  final enactment, the Legislative Reference Bureau shall insert
    11  or revise letters or numbers for projects where the letters or
    12  numbers are missing or require revision. The bureau shall also
    13  revise the total monetary amounts for the total authorization,
    14  debt authorization, appropriations and departmental totals as
    15  necessary to agree with the total monetary amounts of the
    16  projects.
    17  Section 84.  Repeal.
    18     Section 3(50)(i)(Q) of the act of December 8, 1982 (P.L.848,
    19  No.235), known as the Highway-Railroad and Highway Bridge
    20  Capital Budget Act for 1982-1983, is repealed.
    21  Section 85.  Effective date.
    22     This act shall take effect immediately.






    B3L86RZ/19990S0504B1471         - 677 -