See other bills
under the
same topic
        PRIOR PRINTER'S NO. 593                        PRINTER'S NO. 686

THE GENERAL ASSEMBLY OF PENNSYLVANIA


SENATE BILL

No. 572 Session of 1999


        INTRODUCED BY JUBELIRER, MELLOW, FUMO AND BODACK, MARCH 12, 1999

        AS AMENDED ON THIRD CONSIDERATION, MARCH 22, 1999

                                  A SUPPLEMENT

     1  To the act of May 7, 1998 (P.L.343, No.52), entitled "An act
     2     providing for the capital budget for the fiscal year 1998-
     3     1999," itemizing public improvement projects, furniture and
     4     equipment projects, transportation assistance projects,
     5     redevelopment assistance and redevelopment assistance capital
     6     projects, flood control projects, Keystone Recreation, Park
     7     and Conservation projects, forestry bridge projects and drug
     8     forfeiture fund projects to be constructed or acquired or
     9     assisted by the Department of General Services, the
    10     Department of Conservation and Natural Resources, the
    11     Department of Environmental Protection, the Department of
    12     Community and Economic Development, the Department of
    13     Transportation, the Pennsylvania Fish and Boat Commission or
    14     the Pennsylvania Game Commission, together with their
    15     estimated financial costs; authorizing the incurring of debt
    16     without the approval of the electors for the purpose of
    17     financing the projects to be constructed or acquired or
    18     assisted by the Department of General Services, the
    19     Department of Conservation and Natural Resources, the
    20     Department of Environmental Protection, the Department of
    21     Community and Economic Development or the Department of
    22     Transportation; stating the estimated useful life of the
    23     projects; authorizing certain waivers; making appropriations;
    24     and making repeals.

    25     The General Assembly of the Commonwealth of Pennsylvania
    26  hereby enacts as follows:
    27  Section 1.  Short title.
    28     This act shall be known and may be cited as the Capital
    29  Budget Project Itemization Act for 1998-1999.

     1  Section 2.  Total authorizations.
     2     (a)  Public improvements.--The total authorization for the
     3  additional capital projects in the category of public
     4  improvement projects itemized in section 3 and to be acquired or
     5  constructed by the Department of General Services, its
     6  successors or assigns, and to be financed by the incurring of
     7  debt, shall be $1,152,466,000 $1,359,712,000.                     <--
     8     (b)  Furniture and equipment.--The total authorization for
     9  the additional capital projects in the category of public
    10  improvement projects consisting of the acquisition of original
    11  movable furniture and equipment to complete public improvement
    12  projects itemized in section 4 and to be acquired by the
    13  Department of General Services, its successors or assigns, and
    14  to be financed by the incurring of debt, shall be $74,517,000     <--
    15  $91,517,000.
    16     (c)  Transportation assistance.--The total authorization for
    17  the capital projects in the category of transportation
    18  assistance projects itemized in section 5 with respect to which
    19  an interest is to be acquired in or constructed by the
    20  Department of Transportation, its successors or assigns, and to
    21  be financed by the incurring of debt, shall be $641,224,000       <--
    22  $695,894,000.
    23     (d)  Redevelopment assistance.--The total authorization for
    24  the additional capital projects in the category of redevelopment
    25  assistance and redevelopment assistance capital projects
    26  itemized in section 6 for capital grants by the Department of
    27  Community and Economic Development, its successors or assigns,
    28  and to be financed by the incurring of debt, shall be
    29  $1,934,500,000 $2,037,078,000.                                    <--
    30     (e)  Flood control.--The total authorization for the capital
    19990S0572B0686                  - 2 -

     1  projects in the category of flood control projects itemized in
     2  section 7 and to be constructed by the Department of
     3  Environmental Protection, its successors or assigns, and to be
     4  financed by the incurring of debt, shall be $44,458,000.
     5     (f)  Keystone Recreation, Park and Conservation.--The total
     6  authorization for the capital projects in the category of
     7  Keystone Recreation, Park and Conservation projects itemized in
     8  section 8 and to be constructed by the Department of
     9  Conservation and Natural Resources, its successors or assigns,
    10  and to be financed from revenues in the Keystone Recreation,
    11  Park and Conservation Fund shall be $89,455,000 $98,837,000.      <--
    12     (g)  Game Fund projects.--The total authorization for the
    13  capital projects in the category of public improvement projects
    14  itemized in section 9 to be acquired by the Pennsylvania Game
    15  Commission and to be financed from current revenues of the Game
    16  Fund pursuant to executive authorizations shall be $1,927,000.
    17     (h)  Fish and Boat Fund projects.--The total authorization
    18  for the capital projects in the category of public improvement
    19  projects itemized in section 10 to be acquired or developed by
    20  the Pennsylvania Fish and Boat Commission and to be financed
    21  from current revenues of the Boat Fund and the Fish Fund
    22  pursuant to executive authorization shall be $2,238,000.
    23     (i)  State Forestry Bridge projects.--The total authorization
    24  for the capital projects in the category of State forestry
    25  bridge projects itemized in section 11 to be constructed by the
    26  Department of Conservation and Natural Resources, its successors
    27  or assigns, and to be financed by oil company franchise tax
    28  revenues pursuant to 75 Pa.C.S. § 9502(a)(2)(iv) (relating to
    29  imposition of tax), shall be $31,228,000.
    30     (j)  Drug Forfeiture Funds projects.--The total authorization
    19990S0572B0686                  - 3 -

     1  for the capital project in the category of public improvement
     2  projects itemized in section 12 to be acquired or developed by
     3  the Department of General Services for the Pennsylvania State
     4  Police, its successors or assigns, and to be financed by drug
     5  forfeiture revenues shall be $300,000.
     6  Section 3.  Itemization of public improvement projects.
     7     Additional capital projects in the category of public
     8  improvement projects to be constructed or acquired by the
     9  Department of General Services, its successors or assigns, and
    10  to be financed by the incurring of debt, are hereby itemized,
    11  together with their respective estimated financial costs, as
    12  follows:
    13                                                           Total
    14                                                          Project
    15             Project                                    Allocation
    16  (1)  Department of Agriculture                      $120,140,000
    17     (i)  Equine Exposition Center
    18         (A)  Construction of an equine exposition
    19             center                                     13,500,000
    20             (Base Project Allocation - $11,250,000)
    21             (Design and Contingencies - $2,250,000)
    22     (ii)  Veterinary Diagnostic Laboratory
    23         (A)  Construction of a sample receiving
    24             room                                          600,000
    25             (Base Project Allocation - $500,000)
    26             (Design and Contingencies - $100,000)
    27     (iii)  Meat Animal Evaluation Center
    28         (A)  Construction of a new meat animal
    29             evaluation facility                         5,800,000
    30             (Base Project Allocation - $4,834,000)
    19990S0572B0686                  - 4 -

     1             (Design and Contingencies - $966,000)
     2     (iv)  Farm Show Complex
     3         (A)  Coal silo replacement                        240,000
     4             (Base Project Allocation - $200,000)
     5             (Design and Contingencies - $40,000)
     6         (B)  Construction and rehabilitation of the
     7             Pennsylvania Farm Show Complex            100,000,000
     8             (Base Project Allocation - $90,000,000)
     9             (Design and Contingencies -
    10             $10,000,000)
    11  (2)  Department of Community and Economic
    12     Development                                        $4,998,000  <--
    13     DEVELOPMENT                                      $149,998,000  <--
    14     (i)  Allegheny County
    15         (A)  Purchase and installation of traffic
    16             control devices, Greentree Road               250,000
    17         (B)  PITTSBURGH INTERNATIONAL AIRPORT,                     <--
    18             MAINTENANCE COMPLEX, DEVELOPMENT OF A
    19             STATE-OF-THE-ART MAINTENANCE FACILITY
    20             FOR US AIRWAYS                            100,000,000
    21         (C)  PORT OF PITTSBURGH COMMISSION, LOWER
    22             MONONGAHELA IMPROVEMENT PROJECT,
    23             DREDGING AND TERMINAL IMPROVEMENTS         45,000,000
    24     (ii)  Carbon County
    25         (A)  East Side Borough, reconstruction and
    26             rehabilitation of school building for
    27             use as borough offices, meeting hall
    28             and senior citizen community facility          60,000
    29         (B)  Mahoning Township, land acquisition
    30             for the construction of new township
    19990S0572B0686                  - 5 -

     1             offices and police station                    300,000
     2         (C)  Banks Township, design and
     3             construction of township office and
     4             community activity building                   145,000
     5         (D)  County Project, design and
     6             construction of new building or
     7             acquisition and rehabilitation of
     8             existing building for county operations
     9             facility                                    1,500,000
    10     (iii)  Schuylkill County
    11         (A)  Foster Township, design and
    12             construction of municipal building            350,000
    13         (B)  Borough of St. Clair, design and
    14             construction of police station                350,000
    15         (C)  Borough of Tremont, interior and
    16             exterior repair and reconstruction of
    17             Tremont area community center including
    18             roof, windows, waterproofing, doors
    19             painting and HVAC systems                     385,000
    20         (D)  Hubley Township, design and
    21             construction of municipal building            250,000
    22         (E)  Borough of Ringtown, design and
    23             construction of municipal building            250,000
    24         (F)  Rush Township, construction of
    25             township building including original
    26             furniture and equipment                       600,000
    27         (G)  Borough of Mahanoy City, design and
    28             construction of Mahanoy Area Train
    29             Station Depot/Museum                          200,000
    30         (H)  North Manheim Township, additions and
    19990S0572B0686                  - 6 -

     1             modification to township building             258,000
     2         (I) Borough of Cressona, renovation of salt
     3             storage building and construction of
     4             additional garage space                       100,000
     5  (3)  Department of Conservation and Natural
     6     Resources                                         $45,300,000  <--
     7     RESOURCES                                         $44,200,000  <--
     8     (i)  Forest District 18
     9         (A)  Rehabilitation of White Oak Road             200,000
    10             (Base Project Allocation - $200,000)
    11     (ii)  Delaware Canal State Park
    12         (A)  Excavation and restoration of Delaware
    13             Canal for approximately .75 mile in
    14             Tullytown Borough                           3,600,000
    15             (Base Project Allocation - $3,000,000)
    16             (Design and Contingencies - $600,000)
    17         (B)  Construction of pedestrian walkway           600,000
    18             (Base Project Allocation - $500,000)
    19             (Design and Contingencies - $100,000)
    20         (C)  Redirect Delaware Canal around support
    21             stanchions for U.S. Route 1                 1,200,000
    22             (Base Project Allocation - $1,000,000)
    23             (Design and Contingencies - $200,000)
    24         (D)  Acquisition of land in Lower UPPER                    <--
    25             Makefield Township for recreational
    26             purposes and sanitary facilities            1,000,000
    27     (iii)  Lehigh Gorge State Park
    28         (A)  Additional Funds FUNDS for DGS 194-46,                <--
    29             land acquisition for Lehigh Gorge State
    30             Park                                        2,500,000
    19990S0572B0686                  - 7 -

     1             (Land Allocation - $2,500,000)
     2     (iv)  Little Buffalo State Park
     3         (A)  Renovation of swimming pool                1,350,000  <--
     4         (A)  CONSTRUCTION OF AN ARTS BUILDING             100,000  <--
     5         (B)  CONSTRUCTION OF A PERMANENT
     6             PERFORMANCE PAVILION                          150,000
     7     (v)  Ricketts Glen State Park
     8         (A)  Park improvements                          3,499,000
     9             (Base Project Allocation - $2,916,000)
    10             (Design and Contingencies - $583,000)
    11     (vi)  Presque Isle State Park
    12         (A)  Beach nourishment                            800,000
    13             (Base Project Allocation - $800,000)
    14         (B)  Renovation and expansion of
    15             administration building                       850,000
    16         (C)  Renovation of existing roadways,
    17             bridges and parking lots, Phase II          3,300,000
    18         (D)  Acquisition and development of Great
    19             Lake Visitation, Research and Education
    20             Center                                     25,000,000
    21     (vii)  Pymatuning State Park
    22         (A)  Additional Funds FUNDS for DGS 103-7,                 <--
    23             rehabilitate Espyville Boat Livery            701,000
    24             (Base Project Allocation - $584,000)
    25             (Design and Contingencies - $117,000)
    26         (B)  Pymatuning Trail development between
    27             Linesville and Jamestown Boroughs             700,000
    28  (4)  Department of Corrections                       $60,801,000
    29     (i)  State Correctional Institution at Camp
    30         Hill
    19990S0572B0686                  - 8 -

     1         (A)  Construction of new coal handling
     2             system                                      1,260,000
     3             (Base Project Allocation - $1,050,000)
     4             (Design and Contingencies - $210,000)
     5     (ii)  State Correctional Institution at Cresson
     6         (A)  New kitchen and loading dock               2,160,000
     7             (Base Project Allocation - $1,800,000)
     8             (Design and Contingencies - $360,000)
     9     (iii)  State Correctional Institution at Dallas
    10         (A)  Electrical system upgrades                 7,680,000
    11             (Base Project Allocation - $6,400,000)
    12             (Design and Contingencies - $1,280,000)
    13         (B)  Additional funds for boiler plant
    14             renovations approved in Act 47 of 1997      1,140,000
    15             (Base Project Allocation - $950,000)
    16             (Design and Contingencies - $190,000)
    17     (iv)  State Correctional Institution at
    18         Graterford
    19         (A)  Plumbing and heating system
    20             renovations                                 6,000,000
    21             (Base Project Allocation - $5,000,000)
    22             (Design and Contingencies - $1,000,000)
    23     (v)  State Correctional Institution at
    24         Greensburg
    25         (A)  Additional funds for electric utility
    26             system upgrades approved in Act 47 of
    27             1997                                          720,000
    28             (Base Project Allocation - $600,000)
    29             (Design and Contingencies - $120,000)
    30     (vi)  State Correctional Institution at
    19990S0572B0686                  - 9 -

     1         Huntingdon
     2         (A)  Security systems upgrade                   9,540,000
     3             (Base Project Allocation - $7,950,000)
     4             (Design and Contingencies - $1,590,000)
     5     (vii)  State Correctional Institution at Laurel
     6         Highlands
     7         (A)  Additional funds for DGS 376-1, Phase
     8             II, conversion of Somerset State
     9             Hospital to a correctional institution     10,020,000
    10             (Base Project Allocation - $8,350,000)
    11             (Design and Contingencies - $1,670,000)
    12     (viii)  State Correctional Institution at
    13         Mercer
    14         (A)  Additional funds for the construction
    15             of a Level 2 housing unit and
    16             renovation of support structures
    17             approved in Act 47 of 1997                  5,650,000
    18             (Base Project Allocation - $4,708,000)
    19             (Design and Contingencies - $942,000)
    20     (ix)  State Correctional Institution at Muncy
    21         (A)  Construction of a youthful offender
    22             housing unit                                2,100,000
    23             (Base Project Allocation - $1,750,000)
    24             (Design and Contingencies - $350,000)
    25     (x)  Quehanna Motivational Boot Camp
    26         (A)  Construction of a new sewage treatment
    27             plant                                       1,951,000
    28             (Base Project Allocation - $1,626,000)
    29             (Design and Contingencies - $325,000)
    30     (xi)  State Correctional Institution at
    19990S0572B0686                 - 10 -

     1         Smithfield
     2         (A)  Reconstruction of underground water
     3             system                                      4,554,000
     4             (Base Project Allocation - $3,795,000)
     5             (Design and Contingencies - $759,000)
     6     (xii)  State Correctional Institution at
     7         Waynesburg
     8         (A)  Life safety code improvements              3,046,000
     9             (Base Project Allocation - $2,538,000)
    10             (Design and Contingencies - $508,000)
    11         (B)  Addition to dietary                        2,580,000
    12             (Base Project Allocation - $2,150,000)
    13             (Design and Contingencies - $430,000)
    14     (xiii)  State Correctional Training Academy at
    15         Elizabethtown
    16         (A)  Electrical system renovations              2,400,000
    17             (Base Project Allocation - $2,000,000)
    18             (Design and Contingencies - $400,000)
    19  (5)  Department of Education                        $276,270,000
    20     (i)  Scranton State School for the Deaf
    21         (A)  Steam line replacement                       240,000
    22             (Base Project Allocation - $200,000)
    23             (Design and Contingencies - $40,000)
    24     (ii)  Thaddeus Stevens College of Technology
    25         (A)  Acquisition of community hospital
    26             building and conversion to dormitory
    27             and classroom facilities                    6,400,000
    28             (Base Project Allocation - $2,000,000)
    29             (Land Allocation - $4,000,000)
    30             (Design and Contingencies - $400,000)
    19990S0572B0686                 - 11 -

     1     (iii)  Lincoln University
     2         (A)  Boiler plant and steam distribution
     3             system                                      4,200,000
     4             (Base Project Allocation - $3,500,000)
     5             (Design and Contingencies - $700,000)
     6         (B)  Renovation of University Hall              2,530,000
     7             (Base Project Allocation - $2,108,000)
     8             (Design and Contingencies - $422,000)
     9     (iv)  The Pennsylvania State University
    10         (A)  University Park Campus
    11             (I)  Construction of an Information
    12                 Sciences and Technology Building       40,000,000
    13             (II)  Construction of a Biosciences
    14                 Building                               33,000,000
    15             (III) Construction of a new Food
    16                 Science Building                       22,000,000
    17             (IV)  Beaver Stadium infrastructure and
    18                 ADA improvements                       15,000,000
    19         (B)  Penn College of Technology
    20             (I)  Construction of new library           11,400,000
    21         (C)  Beaver Campus
    22             (I)  Construction of
    23                 classroom/administration building       5,000,000
    24         (D)  Delaware County Campus
    25             (I)  Construction of classroom
    26             building                                    7,200,000
    27                 (Base Project Allocation -
    28                 $6,000,000)
    29                 (Design and Contingencies -
    30                 $1,200,000)
    19990S0572B0686                 - 12 -

     1     (v)  Temple University
     2         (A)  Health Sciences Campus
     3             (I)  Health Sciences Center Library        10,000,000
     4                 (Base Project Allocation -
     5                 $8,333,000)
     6                 (Design and Contingencies -
     7                 $1,667,000)
     8             (II)  Design and construction of a
     9                 diagnostic imaging and patient
    10                 services building at Temple
    11                 University Hospital                     5,000,000
    12         (B)  Main Campus
    13             (I)  Improvements to primary electrical
    14                 system, Phase II                        3,900,000
    15             (II)  Design and construction of
    16                 hospitality school facility            10,000,000
    17             (III)  Design and construction of an
    18                 annex building for the student
    19                 activity center                         4,600,000
    20             (IV)  Design and construction of a
    21                 mini-arts campus primarily for the
    22                 arts, including one new building
    23                 and necessary improvements for
    24                 conversion of 1101 Montgomery
    25                 Avenue for academic and academic
    26                 support uses                           25,000,000
    27         (C)  Ambler Campus
    28             (I)  Additional funds for design and
    29                 construction of the Ambler Learning
    30                 Center                                  2,800,000
    19990S0572B0686                 - 13 -

     1     (vi)  University of Pittsburgh
     2         (A)  Oakland Campus
     3             (I)  Ventilation and fume hood upgrade
     4                 for Chevron Science Center              6,000,000
     5                 (Base Project Allocation -
     6                 $5,000,000)
     7                 (Design and Contingencies -
     8                 $1,000,000)
     9             (II)  Renovation and addition to
    10                 central chilled water system            7,800,000
    11                 (Base Project Allocation -
    12                 $6,500,000)
    13                 (Design and Contingencies -
    14                 $1,300,000)
    15             (III)  Renovation - Phase II of
    16                 Fitzgerald Fieldhouse and Trees
    17                 Hall                                   14,450,000
    18                 (Base Project Allocation -
    19                 $12,042,000)
    20                 (Design and Contingencies -
    21                 $2,408,000)
    22         (B)  Greensburg Campus
    23             (I)  Additions to Common Facilities
    24                 Building                                3,500,000
    25                 (Base Project Allocation -
    26                 $2,917,000)
    27                 (Design and Contingencies -
    28                 $583,000)
    29         (C)  Johnstown Campus
    30             (I)  Expansion of the Pasquerilla
    19990S0572B0686                 - 14 -

     1                 Performing Arts Center                  2,000,000
     2             (II)  Expansion and renovation of the
     3                 Sports Center                           1,750,000
     4         (D)  All Campuses
     5             (I)  Classroom instructional
     6                 technology                              5,500,000
     7                 (Base Project Allocation -
     8                 $4,583,000)
     9                 (Design and Contingencies -
    10                 $917,000)
    11             (II)  Deferred maintenance - Phase III     18,000,000
    12                 (Base Project Allocation -
    13                 $15,000,000)
    14                 (Design and Contingencies -
    15                 $3,000,000)
    16             (III)  Programmatic renovations             9,000,000
    17                 (Base Project Allocation -
    18                 $7,500,000)
    19                 (Design and Contingencies -
    20                 $1,500,000)
    21  (6)  Pennsylvania Emergency Management Agency         $2,259,000
    22     (i)  State Fire Academy
    23         (A)  Reconstruction and upgrade of fire
    24             training facilities                         1,500,000
    25             (Base Project Allocation - $1,250,000)
    26             (Design and Contingencies - $250,000)
    27     (ii)  Western Area Emergency Operations Center
    28         in Indiana County
    29         (A)  Construction of a new facility               759,000
    30             (Base Project Allocation - $633,000)
    19990S0572B0686                 - 15 -

     1             (Design and Contingencies - $126,000)
     2  (7)  Department of Environmental Protection          $38,019,000  <--
     3  (7)  DEPARTMENT OF ENVIRONMENTAL PROTECTION          $45,377,000  <--
     4     (i)  Allegheny County
     5         (A)  Additional funds for DGS 184-20, flood
     6             protection along McLaughlin Run
     7             Extension, Bethel Park Borough                540,000
     8             (Base Project Allocation - $450,000)
     9             (Design and Contingencies - $90,000)
    10         (B)  Greenwald Flood Control Project            2,450,000
    11         (C)  Logan Creek Flood Control Project          3,500,000
    12     (ii)  Beaver County
    13         (A)  Dredging of Beaver River                   2,500,000
    14     (iii)  Blair County
    15         (A)  Reconstruction of interceptor drainage
    16             system, Burgoon Road to 58th Street,
    17             City of Altoona                             1,500,000
    18     (iv)  Bucks County
    19         (A)  Rehabilitation of the Morrisville
    20             Flood Protection Project                    1,200,000
    21             (Base Project Allocation - $1,000,000)
    22             (Design and Contingencies - $200,000)
    23     (v)  Carbon County
    24         (A)  Reconstruction of flood damaged
    25             retaining wall to support street, City
    26             of Jim Thorpe                                 150,000
    27     (vi)  Clearfield County
    28         (A)  Additional funds for DGS 182-14,
    29             construction of levees and floodwalls,
    30             Coalport Borough                           2,160,000
    19990S0572B0686                 - 16 -

     1             (Base Project Allocation - $1,800,000)
     2             (Design and Contingencies - $360,000)
     3         (B)  Construction of levee along Anderson
     4             Creek, Curwensville Borough                 2,160,000
     5             (Base Project Allocation - $1,800,000)
     6             (Design and Contingencies - $360,000)
     7     (vii)  Elk County
     8         (A)  City of St. Marys, storm water and
     9         flood control project                           1,500,000
    10     (viii)  Lehigh County
    11         (A)  Study and survey of the lower reaches
    12             of the Little Lehigh River                    100,000
    13         (B)  Phoenix Square waterway obstruction
    14             removal project, City of Allentown            145,000
    15         (C)  Storm sewer extension into Alton Park        185,000
    16         (D)  Lehigh Street/33rd Street drainage
    17             improvement project, Salisbury
    18             Township                                    1,200,000
    19     (ix)  Luzerne County
    20         (A)  Stream improvement project, City of
    21             Wilkes-Barre                                1,000,000
    22     (x)  Lycoming County
    23         (A)  Integrated Flood Forecasting System -
    24             urban area topography study including
    25             hydrologic studies, stream and rain
    26             gauging and flood inundation mapping        1,500,000
    27         (B)  Lower Lycoming Creek flood mitigation      1,800,000
    28         (C)  Countywide Flood Hazard Mitigation
    29             Program                                       500,000
    30         (D)  Mclure's Run stream restoration
    19990S0572B0686                 - 17 -

     1             project including culvert replacement,
     2             Loyalsock Township                            117,000
     3         (E)  Muncy Creek stream restoration
     4             project, Muncy Creek Township                 740,000
     5         (F)  Hagerman's Run flood control project
     6             including the rehabilitation and
     7             upgrade of conduit, South Williamsport
     8             Borough                                     1,000,000
     9     (XI)  MONROE COUNTY                                            <--
    10         (A)  EAST STROUDSBURG BOROUGH,
    11             RECONSTRUCTION OF DAM SPILLWAY AND
    12             DEVELOPMENT OF WELL NO.4                    1,000,000
    13     (xi) (XII)  Montgomery County                                  <--
    14         (A)  Additional funds for DGS 179-1,
    15             construction of a fishway, Flat Rock
    16             Dam                                         1,440,000
    17             (Base Project Allocation - $1,200,000)
    18             (Design and Contingencies - $240,000)
    19         (B)  Removal of Plymouth Dam, Schuylkill
    20             River                                       1,020,000
    21             (Base Project Allocation - $850,000)
    22             (Design and Contingencies - $170,000)
    23         (C)  Reconstruction of the abutments for
    24             Auburn Dam, Schuylkill River                  180,000
    25             (Base Project Allocation - $150,000)
    26             (Design and Contingencies - $30,000)
    27     (xii) (XIII)  Northampton County                               <--
    28         (A)  Route 512 flood relief project,
    29             Hanover Township                            1,540,000
    30         (B)  RENOVATION OF CITY WATERSHED               1,000,000  <--
    19990S0572B0686                 - 18 -

     1         (C)  CITY OF BETHLEHEM, RENOVATION OF STORM
     2             WATER SYSTEM                                1,500,000
     3         (D)  WILLIAMS TOWNSHIP, BRIDGE REPLACEMENT,
     4             STORM WATER MANAGEMENT/MAINTENANCE
     5             RENOVATION                                  1,058,000
     6         (E)  BOROUGH OF WIND GAP, STORM WATER
     7             MANAGEMENT                                  2,200,000
     8         (F)  PLAINFIELD TOWNSHIP, STORM WATER
     9             MANAGEMENT, MUNICIPAL IMPROVEMENTS            600,000
    10     (xiii) (XIV)  Schuylkill County                                <--
    11         (A)  Cumbola Village flood protection
    12             project, Blythe Township                    1,800,000
    13             (Base Project Allocation - $1,500,000)
    14             (Design and Contingencies - $300,000)
    15         (B)  Construction of storm water system at
    16             Vernon Miller and Crest Street to
    17             reduce flooding along State Routes 1017
    18             and 1477, Rush Township                       230,000
    19         (C)  Dredging of Shenandoah Creek and
    20             reconstruction of creek walls and
    21             Kohinoor Creek culvert, Borough of
    22             Shenandoah                                    425,000
    23         (D)  Construction of storm drains for
    24             runoff on West Oak Street, Borough of
    25             Frackville                                    467,000
    26         (E)  Storm water management improvements
    27             including construction of inlets and
    28             installation of piping and construction
    29             of bituminous swales and roll curb on
    30             Coal Street, Village of Upper
    19990S0572B0686                 - 19 -

     1             Brownsville, West Mahanoy Township            110,000
     2     (xiv) (XV)  Somerset County                                    <--
     3         (A)  Rehabilitation of the Windber Borough
     4             flood protection project                    1,440,000
     5             (Base Project Allocation - $1,200,000)
     6             (Design and Contingencies - $240,000)
     7     (xv) (XVI)  Warren County                                      <--
     8         (A)  Rehabilitation of the Warren Borough
     9             flood protection project                      900,000
    10             (Base Project Allocation - $750,000)
    11             (Design and Contingencies - $150,000)
    12     (xvi) (XVII)  Westmoreland County                              <--
    13         (A)  Additional funds for DGS 182-7,
    14             construction of a levee and concrete
    15             floodwall, City of Jeannette                2,520,000
    16             (Base Project Allocation - $2,100,000)
    17             (Design and Contingencies - $420,000)
    18  (8)  Department of General Services                 $166,503,000  <--
    19  (8)  DEPARTMENT OF GENERAL SERVICES                 $187,003,000  <--
    20     (i)  Capitol Area Buildings
    21         (A)  Fire safety upgrades to Agriculture,
    22             Forster St., State Records Center and
    23             Publication Buildings                         125,000
    24             (Base Project Allocation - $104,000)
    25             (Design and Contingencies - $21,000)
    26     (ii)  Capitol Complex
    27         (A)  Upgrade chillers at the Central                       <--
    28             Refrigeration Plant                         2,500,000
    29             (Base Project Allocation - $2,000,000)
    30             (Design and Contingencies - $500,000)
    19990S0572B0686                 - 20 -

     1         (A)  ADDITIONAL FUNDS FOR DGS 948-37,                      <--
     2             CENTRAL AIR CONDITIONING EXPANSION TO
     3             MAIN CAPITOL TO UPGRADE THE CENTRAL
     4             CHILLER PLANT AND CONNECTIONS TO
     5             CAPITOL BUILDINGS                           5,000,000
     6             (BASE PROJECT ALLOCATION - $5,000,000)
     7         (B)  Heating, ventilating and air
     8             conditioning system upgrades for the
     9             Labor and Industry Building                 1,858,000
    10             (Base Project Allocation - $1,486,000)
    11             (Design and Contingencies - $372,000)
    12         (C)  Upgrade restroom facilities at the
    13             Finance and Forum Buildings                 6,000,000
    14             (Base Project Allocation - $5,000,000)
    15             (Design and Contingencies - $1,000,000)
    16         (D)  Restoration of bronze doors and
    17             enclosures at all Capitol Complex
    18             Locations                                   1,980,000
    19             (Base Project Allocation - $1,650,000)
    20             (Design and Contingencies - $330,000)
    21     (iii)  Allegheny County
    22         (A)  Phase II expansion of Lawrence
    23             Convention Center                         125,000,000
    24         (B)  Development of major hotel in
    25             conjunction with expansion of Lawrence
    26             Convention Center                          27,000,000
    27     (iv)  Erie Civic Center
    28         (A)  Repair of brick facade and upgrade of
    29             capital equipment                           2,040,000
    30             (Base Project Allocation - $1,700,000)
    19990S0572B0686                 - 21 -

     1             (Design and Contingencies - $340,000)
     2     (V)  ERIE ART MUSEUM                                           <--
     3         (A)  ACQUISITION, DESIGN AND CONSTRUCTION
     4             OF THE ERIE ART MUSEUM ANNEX AND SHARED
     5             FACILITIES CONNECTOR BUILDING              18,000,000
     6             (BASE PROJECT ALLOCATION - $14,400,000)
     7             (DESIGN AND CONTINGENCIES - $3,600,000)
     8  (9)  Pennsylvania Historical and Museum
     9     Commission                                         $2,760,000
    10     (i)  Allegheny County
    11         (A)  Fort Pitt Museum construction of a
    12             gallery and permanent exhibits              2,400,000
    13             (Base Project Allocation - $2,000,000)
    14             (Design and Contingencies - $400,000)
    15     (ii)  Erie County
    16         (A)  Erie Maritime Museum, Fire Suppression
    17             System                                        360,000
    18             (Base Project Allocation - $300,000)
    19             (Design and Contingencies - $60,000)
    20  (10)  Department of Military and Veterans Affairs     $7,555,000  <--
    21  (10)  DEPARTMENT OF MILITARY AND VETERANS AFFAIRS     $9,538,000  <--
    22     (i)  Armory at Connellsville
    23         (A)  Construction of new armory and land
    24             acquisition                                 1,620,000
    25             (Base Project Allocation - $1,200,000)
    26             (Land Allocation - $300,000)
    27             (Design and Contingencies - $120,000)
    28     (ii)  Armory at New Milford
    29         (A)  Construction of new armory and land
    30             acquisition                                 1,500,000
    19990S0572B0686                 - 22 -

     1             (Base Project Allocation - $1,000,000)
     2             (Land Allocation - $300,000)
     3             (Design and Contingencies - $200,000)
     4     (iii)  Armory at Pottsville
     5         (A)  Capital improvements to armory for
     6             reuse as youth center                         200,000
     7     (iv)  Fort Indiantown Gap, Dauphin/Lebanon
     8         Counties
     9         (A)  Installation of natural gas feeder
    10             lines and conversion of furnace
    11             burners                                       460,000
    12             (Base Project Allocation - $420,000)
    13             (Design and Contingencies - $40,000)
    14     (V)  GREENE COUNTY ARMORY, LAND AND BUILDING                   <--
    15         ACQUISITION, DEMOLITION, CONSTRUCTION AND
    16         IMPROVEMENTS                                      750,000
    17     (VI)  GREENE COUNTY ARMORY, REHABILITATION OF
    18         ARMORY                                            500,000
    19     (v) (VII)  Hollidaysburg Veterans' Center,                     <--
    20         Blair County
    21         (A)  Reconstruct/replace roof on Eisenhower
    22             Hall                                          410,000
    23             (Base Project Allocation - $372,000)
    24             (Design and Contingencies - $38,000)
    25     (vi) (VIII)  Pennsylvania Soldiers and Sailors                 <--
    26         Home, Erie County
    27         (A)  Restoration of exterior masonry of
    28             Main Building                               1,100,000
    29             (Base Project Allocation - $917,000)
    30             (Design and Contingencies - $183,000)
    19990S0572B0686                 - 23 -

     1     (vii) (IX)  Scotland School for Veterans'                      <--
     2         Children
     3         (A)  Replacement of underground fuel oil
     4             storage tanks                                 360,000
     5             (Base Project Allocation - $300,000)
     6             (Design and Contingencies - $60,000)
     7         (B)  Modernization of boiler plant              1,120,000
     8             (Base Project Allocation - $930,000)
     9             (Design and Contingencies - $190,000)
    10     (vii) (X)  Southeastern Veterans' Center,                      <--
    11         Chester County
    12         (A)  Renovation of water stand and tank           350,000
    13             (Base Project Allocation - $350,000)
    14         (B)  Renovation of reservoir liner                125,000
    15             (Base Project Allocation - $125,000)
    16         (C)  Exterior weatherization for Coates
    17             Hall                                          175,000
    18             (Base Project Allocation - $175,000)
    19         (D)  Install automatic door locking system        135,000
    20             (Base Project Allocation - $120,000)
    21             (Design and Contingencies - $15,000)
    22         (E)  ADDITIONAL FUNDS FOR DIETARY BUILDING                 <--
    23             AND PARKING LOT                               733,000
    24  (11)  Department of Public Welfare                   $29,803,000
    25     (i)  Ebensburg State Hospital, Cambria County
    26         (A)  Renovate/replace heating system in
    27             Buildings No.1 through No.7                 5,040,000
    28             (Base Project Allocation - $4,200,000)
    29             (Design and Contingencies - $840,000)
    30         (B)  Improvements to electrical
    19990S0572B0686                 - 24 -

     1             distribution system in Buildings Nos.
     2             11, 15, 32 and 53                             900,000
     3             (Base Project Allocation - $750,000)
     4             (Design and Contingencies - $150,000)
     5     (ii)  Harrisburg State Hospital, Dauphin County
     6         (A)  Renovate Building No.17                    4,320,000
     7             (Base Project Allocation - $3,600,000)
     8             (Design and Contingencies - $720,000)
     9         (B)  Petry Building, installation of
    10             central air conditioning                    3,600,000
    11             (Base Project Allocation - $3,000,000)
    12             (Design and Contingencies - $600,000)
    13     (iii)  Mayview State Hospital, Allegheny County
    14         (A)  Life safety code upgrades                  1,800,000
    15             (Base Project Allocation - $1,500,000)
    16             (Design and Contingencies - $300,000)
    17     (iv)  Norristown State Hospital, Montgomery
    18         County
    19         (A)  Replace electrical cables                  1,200,000
    20             (Base Project Allocation - $1,000,000)
    21             (Design and Contingencies - $200,000)
    22         (B)  Life safety code upgrades                  1,858,000
    23             (Base Project Allocation - $1,548,000)
    24             (Design and Contingencies - $310,000)
    25     (v)  Polk Center
    26         (A)  Upgrade electrical service                   600,000
    27             (Base Project Allocation - $500,000)
    28             (Design and Contingencies - $100,000)
    29     (vi)  Selinsgrove Center, Snyder County
    30         (A)  Install particulate emissions
    19990S0572B0686                 - 25 -

     1             collection system                           1,200,000
     2             (Base Project Allocation - $1,000,000)
     3             (Design and Contingencies - $200,000)
     4         (B)  Replace electrical feeder cables           1,680,000
     5             (Base Project Allocation - $1,400,000)
     6             (Design and Contingencies - $280,000)
     7     (vii)  Torrance State Hospital
     8         (A)  Upgrade water source and distribution        660,000
     9             (Base Project Allocation - $550,000)
    10             (Design and Contingencies - $110,000)
    11     (viii)  Wernersville State Hospital, Berks
    12         County
    13         (A)  New gas or oil fired boiler
    14             installation                                  720,000
    15             (Base Project Allocation - $600,000)
    16             (Design and Contingencies - $120,000)
    17     (ix)  Youth Development Center at Bensalem,
    18         Bucks County
    19         (A)  Life safety code upgrades                  1,350,000
    20             (Base Project Allocation - $1,125,000)
    21             (Design and Contingencies - $225,000)
    22     (x)  Youth Development Center at New Castle,
    23         Lawrence County
    24         (A)  Life safety code upgrades                  1,155,000
    25             (Base Project Allocation - $962,000)
    26             (Design and Contingencies - $193,000)
    27     (xi)  Youth Forestry Camp No.2, Carbon County
    28         (A)  Construct new gym/activities Building      3,720,000
    29             (Base Project Allocation - $3,100,000)
    30             (Design and Contingencies - $620,000)
    19990S0572B0686                 - 26 -

     1  (12)  Pennsylvania State Police                      $17,162,000
     2     (i)  State Police Academy, Dauphin County
     3         (A)  Additional funds for DGS 211-5,
     4             renovations and expansion of academy        3,950,000
     5             (Base Project Allocation - $3,292,000)
     6             (Design and Contingencies - $658,000)
     7     (ii)  Summerdale Laboratory Complex
     8         (A)  Additional funds for DGS 948-33,
     9             construction of a State Police Crime
    10             Laboratory                                 12,900,000
    11             (Base Project Allocation - $10,750,000)
    12             (Design and Contingencies - $2,150,000)
    13     (iii)  Trevose Station, Bucks County
    14         (A)  Additional construction funds                312,000
    15  (13)  State System of Higher Education              $368,086,000  <--
    16  (13)  STATE SYSTEM OF HIGHER EDUCATION              $401,591,000  <--
    17     (i)  Bloomsburg University
    18         (A)  Restoration of Carver Hall Tower           3,000,000
    19         (B)  Addition or renovation of Redman
    20             Stadium                                     2,200,000
    21         (C)  Renovation of Ben Franklin Building        5,220,000
    22     (ii)  California University
    23         (A)  Renovation of Old Industrial Arts
    24             Facility                                    6,773,000
    25         (B)  Construction of University Support
    26             Facility                                    4,181,000
    27         (C)  Replacement of selected high voltage
    28             cables and switches                           542,000
    29             (Base Project Allocation - $452,000)
    30             (Design and Contingencies - $90,000)
    19990S0572B0686                 - 27 -

     1     (iii)  Cheyney University
     2         (A)  Additional funds for DGS 403-60,
     3             renovations to Burleigh Hall               2, 140,000
     4             (Base Project Allocation - $1,783,000)
     5             (Design and Contingencies - $357,000)
     6         (B)  Additional funds for DGS 403-68,
     7             renovations to the Emlen Complex            4,953,000
     8             (Base Project Allocation - $4,127,000)
     9             (Design and Contingencies - $826,000)
    10         (C)  Renovation of Humphreys Hall               3,800,000
    11             (Base Project Allocation - $3,167,000)
    12             (Design and Contingencies - $633,000)
    13         (D)  Renovation of Foster Union                 4,896,000
    14         (E)  Construction of President's Residence        650,000
    15     (iv)  Clarion University
    16         (A)  Renovation of Becht Hall                   5,506,000
    17         (B)  Construction of parking deck               5,700,000
    18         (C)  Addition/renovation of Marwick-Boyd
    19             Fine Arts Center                            7,085,000
    20         (D)  Modify facilities for ADA compliance       3,624,000
    21         (E)  Renovate Moore Hall                        1,107,000
    22         (F)  Renovate and expand Tippin Gymnasium       5,954,000
    23         (G)  Renovate Still Hall                        6,012,000
    24     (v)  East Stroudsburg University
    25         (A)  Renovation and expansion of existing
    26             Eiler-Martin Stadium Complex                3,226,000
    27             (Base Project Allocation - $2,688,000)
    28             (Design and Contingencies - $538,000)
    29         (B)  Renovation and expansion of the
    30             Abeloff Convocation Center                  4,900,000
    19990S0572B0686                 - 28 -

     1             (Base Project Allocation - $4,083,000)
     2             (Design and Contingencies - $817,000)
     3         (C)  Environmental safety and mid life
     4             renovations, Fine and Performing Arts
     5             Center                                      1,080,000
     6             (Base Project Allocation - $900,000)
     7             (Design and Contingencies - $180,000)
     8         (D)  New athletic complex                      19,487,000
     9             (Base Project Allocation - $16,239,000)
    10             (Design and Contingencies - $3,248,000)
    11             (I)  New stadium complex - $9,677,000
    12             (II)  New baseball field - $1,445,000
    13             (III)  New softball field - $867,000
    14             (IV)  Parking (1,000 spaces) -
    15                 $1,000,000
    16             (V)  Access road, sidewalks, etc. -
    17                 $1,400,000
    18             (VI)  Land acquisition (37 acres) -
    19                 $1,850,000
    20         (E)  CONSTRUCTION OF ACADEMIC SCIENCES                     <--
    21             BUILDING                                   21,234,000
    22         (F)  CONSTRUCTION OF PARKING GARAGE             9,228,000
    23     (vi)  Edinboro University
    24         (A)  Development of a natural resources and
    25             environmental center along the
    26             shoreline of Lake Erie in Springfield
    27             and Girard Townships                        4,520,000
    28         (B)  Construction and/or development of a
    29             Tooling/Mold Design Technology Center       2,920,000
    30         (C)  Renovation of existing facilities to
    19990S0572B0686                 - 29 -

     1             create the Arts and Conference Center       1,933,000
     2         (D)  Renovation of Academy Hall                 1,891,000
     3         (E)  Renovation of Cooper Science, Phase
     4             II                                         10,658,000
     5     (vii)  Indiana University of Pennsylvania
     6         (A)  Construction of a multipurpose
     7             convocation center                         38,271,000
     8         (B)  Academic Sciences Building                21,234,000
     9             (Base Project Allocation - $17,695,000)
    10             (Design and Contingencies - $3,539,000)
    11         (C)  Parking garage                             9,228,000
    12             (Base Project Allocation - $7,690,000)
    13             (Design and Contingencies - $1,538,000)
    14     (viii)  Kutztown University
    15         (A)  Construct College of Visual and
    16             Performing Arts Learning Center            19,550,000
    17         (B)  Renovation of Sharidan Arts Building       8,584,000
    18         (C)  Renovation of Lytle Building                 503,000
    19         (D)  Life Cycle Renovation Kemp Building          508,000
    20         (E)  Boiler replacement                         2,857,000  <--
    21             (Base Project Allocation - $2,381,000)
    22             (Design and Contingencies - $476,000)
    23         (E)  RENOVATION OR REPLACEMENT OF BOILER                   <--
    24             PLANT                                       5,900,000
    25     (ix)  Lock Haven University
    26         (A)  Acquisition of land and properties
    27             owned by the Keystone Central School
    28             District                                    6,300,000
    29         (B)  Renovation of Russell Hall                 5,760,000
    30     (x)  Mansfield University
    19990S0572B0686                 - 30 -

     1         (A)  Renovation of Butler Center and
     2             Steadman Theatre                           10,848,000
     3         (B)  Upgrade campus infrastructure, phase
     4             II                                          3,223,000
     5         (C)  Renovation and addition to President's
     6             Residence                                     275,000
     7     (xi)  Millersville University
     8         (A)  Renovation of Palmer Bishop                2,845,000
     9         (B)  Addition/renovation of Theatre Arts
    10             Education Building                         12,200,000
    11         (C)  Upgrade campus infrastructure              4,120,000
    12         (D)  Construction of Sports Education
    13             Center                                     10,257,000
    14     (xii)  Shippensburg University
    15         (A)  Renovation of steam distribution
    16             system                                      6,660,000
    17         (B)  Renovation of the electrical
    18             distribution system                         8,729,000
    19     (xiii)  Slippery Rock University
    20         (A)  Addition to North Lodge, McKeever
    21             Environmental Learning Center                 697,000
    22         (B)  Expansion of dining hall, McKeever
    23             Environmental Learning Center                 568,000
    24         (C)  Construction of McKeever Conference
    25             Center                                      3,343,000
    26             (Base Project Allocation - $2,786,000)
    27             (Design and Contingencies - $557,000)
    28     (xiv)  West Chester University
    29         (A)  Construction of School of Music           21,214,000
    30             (Base Project Allocation - $16,922,000)
    19990S0572B0686                 - 31 -

     1             (Land Allocation - $907,000)
     2             (Design and Contingencies - $3,385,000)
     3         (B)  Construction of Conference Center         20,338,000
     4             (Base Project Allocation - $16,440,000)
     5             (Land Allocation - $793,000)
     6             (Design and Contingencies - $3,105,000)
     7         (C)  Construct vehicle parking garage          16,578,000
     8         (D)  Renovation of E. O. Bull Center            9,438,000
     9  (14)  Department of Transportation                   $12,810,000
    10     (i)  Bucks County Maintenance Facility
    11         (A)  Construct or acquire a replacement
    12             maintenance facility                        2,500,000
    13             (Base Project Allocation - $2,000,000)
    14             (Design and Contingencies - $500,000)
    15     (ii)  Luzerne County Maintenance Facility
    16         (A)  Construct or acquire a replacement
    17             maintenance facility                        3,000,000
    18             (Base Project Allocation - $3,000,000)
    19     (iii)  New Welcome Center, Tioga County
    20         (A)  Additional funds for construction of
    21             new Welcome Center                          3,810,000
    22             (Base Project Allocation - $2,966,000)
    23             (Land Allocation - $250,000)
    24             (Design and Contingencies - $594,000)
    25     (iv)  Washington County Maintenance Facility
    26         (A)  Construct or acquire a replacement
    27             maintenance facility                        3,500,000
    28             (Base Project Allocation - $3,500,000)
    29  Section 4.  Itemization of furniture and equipment projects.
    30     Additional capital projects in the category of public
    19990S0572B0686                 - 32 -

     1  improvement projects consisting of the acquisition of movable
     2  furniture and equipment to complete public improvement projects
     3  and to be purchased by the Department of General Services, its
     4  successors or assigns, and to be financed by the incurring of
     5  debt, are hereby itemized, together with their respective
     6  estimated financial costs, as follows:
     7                                                           Total
     8                                                          Project
     9             Project                                    Allocation
    10  (1)  Department of Conservation and Natural
    11     Resources                                            $880,000
    12     (i)  Delaware Canal State Park
    13         (A)  Furniture and equipment for DGS 141-7,
    14             improvement of recreational facilities        250,000
    15             (Base Project Allocation - $250,000)
    16     (ii)  Nescopeck State Park
    17         (A)  Original furniture and equipment for
    18             DGS 132-1, recreational facilities and
    19             flood control                                 400,000
    20             (Base Project Allocation - $400,000)
    21     (iii)  Presque Isle State Park
    22         (A)  Original furniture and equipment for
    23             DGS 163-19 and DGS 163-20                     150,000
    24     (iv)  Sinnemahoning State Park
    25         (A)  Additional funds for furniture and
    26             equipment for DGS 104-4, improvements
    27             to dam                                         80,000
    28             (Base Project Allocation - $80,000)
    29  (2)  Department of Education                         $63,625,000
    30     (i)  The Pennsylvania State University
    19990S0572B0686                 - 33 -

     1         (A)  University Park Campus
     2             (I)  Utility expenses for West Campus
     3                 Development, Phase II, DGS 800-241        750,000
     4             (II)  Expenses and improvements of
     5                 telecommunications infrastructure,
     6                 DGS 800-243                               790,000
     7             (III)  Original furniture and equipment
     8                 for Science/Chemistry Building         10,500,000
     9             (IV)  Alterations of facilities for ADA
    10                 compliance, Phase I, DGS 800-240        1,000,000
    11             (V)  Capital renewal for buildings and
    12                 systems, DGS 800-265                    1,000,000
    13             (VI)  Original furnishings for Library
    14                 Depository facility                     1,650,000
    15             (VII)  Original furniture and equipment
    16                 for classroom building, Phase II        1,815,000
    17             (VIII)  Original furniture and
    18                 equipment for renovated Burrows
    19                 Building, DGS 800-225                     525,000
    20         (B)  Capitol College
    21             (I)  Installation of distribution and
    22                 heating systems, DGS 800-207              100,000
    23         (C)  Altoona Campus
    24             (I)  Original furniture and equipment
    25                 for classroom building                  1,200,000
    26         (D)  Behrend Campus
    27             (I)  Original furniture and equipment
    28                 for Research and Economic
    29                 Development Center                      4,500,000
    30         (E)  Delaware Campus
    19990S0572B0686                 - 34 -

     1             (I)  Original furniture and equipment
     2                 for DGS 800-208, new classroom
     3                 building                                  290,000
     4             (Base Project Allocation - $290,000)
     5         (F)  York Campus
     6             (I)  Original furniture and equipment
     7                 for Library addition and classroom
     8                 building                                2,200,000
     9     (ii)  Temple University
    10         (A)  Main Campus
    11             (I)  Original furniture and equipment
    12                 for College Hall                          602,000
    13             (II)  Original furniture and equipment
    14                 for Mini-Arts Campus                    4,000,000
    15         (B)  Ambler Campus
    16             (I)  Original furniture and equipment
    17                 for Ambler Learning Center              2,000,000
    18     (iii)  University of Pittsburgh
    19         (A)  Oakland Campus
    20             (I)  Original furnishings and equipment
    21                 for renovations and additions to
    22                 Alumni Hall and Chemistry Building
    23                 - DGS 1103-43                           1,000,000
    24             (II)  Additional original furnishings
    25                 and equipment for the
    26                 Convocation/Events Center - DGS
    27                 1103-48                                 7,083,000
    28             (III)  Additional original furnishings
    29                 and equipment for Multipurpose
    30                 Academic Complex - DGS 1103-40          2,694,000
    19990S0572B0686                 - 35 -

     1             (IV)  Original furnishing and equipment
     2                 for the Upper Campus Chilled Water
     3                 Plant - DGS 1103-38                     1,221,000
     4             (V)  Original furnishings and equipment
     5                 for the renovation of Cathedral of
     6                 Learning                                3,334,000
     7             (VI)  Original furnishings and
     8                 equipment for upgrade and deferred
     9                 maintenance - Phase I                   2,000,000
    10             (VII)  Original furnishings and
    11                 equipment for replacement of the
    12                 steam distribution system - Phase
    13                 II                                        334,000
    14             (VIII)  Original furnishings and
    15                 equipment for the Trees
    16                 Hall/Fitzgerald Fieldhouse
    17                 Renovation - Phase I                    1,884,000
    18             (IX)  Original furnishings and
    19                 equipment for Hillman Library
    20                 renovation                              4,167,000
    21             (X)  Additional original furnishings
    22                 and equipment for Hillman Library
    23                 addition                                1,608,000
    24             (XI)  Original furniture and equipment
    25                 for the Basic Sciences Complex          3,800,000
    26                 (Base Project Allocation -
    27                 $3,800,000)
    28         (B)  Bradford Campus
    29             (I)  Additional original furnishings
    30                 and equipment for Sports Center
    19990S0572B0686                 - 36 -

     1                 Expansion - DGS 1103-60                   634,000
     2         (C)  Johnstown Campus
     3                 (I)  Original furnishings and
     4                 equipment for Owen Library
     5                 Renovations                               944,000
     6  (3)  Department of Environmental Protection           $2,665,000
     7     (i)  Environmental Protection Laboratory
     8         (A)  Original furniture and equipment for
     9             the Environmental Protection Laboratory
    10             Facility                                    2,665,000
    11             (Base Project Allocation - $2,665,000)
    12  (4)  Pennsylvania State Police                        $1,950,000  <--
    13     (i)  Materials testing laboratory, Summerdale
    14         Laboratory Complex
    15         (A)  Acquisition of movable furniture and
    16             equipment                                   1,950,000
    17             (Base Project Allocation - $1,950,000)
    18  (4)  DEPARTMENT OF GENERAL SERVICES                  $17,000,000  <--
    19     (I)  ERIE ART MUSEUM
    20         (A)  ORIGINAL FURNITURE AND EQUIPMENT FOR
    21             THE ERIE ART MUSEUM AND THE SHARED
    22             FACILITIES CONNECTOR BUILDING               2,000,000
    23     (II)  ORIGINAL FURNITURE AND EQUIPMENT FOR DGS
    24         948-41, CONSTRUCTION OF THE KEYSTONE OFFICE
    25         BUILDING                                       15,000,000
    26  (5)  State System of Higher Education                 $5,397,000
    27     (i)  Cheyney University
    28         (A)  Original furniture and equipment,
    29             Foster Union Building                         480,000
    30         (B)  Original furniture and equipment,
    19990S0572B0686                 - 37 -

     1             Carnegie Building                             448,000
     2         (C)  Original furniture and equipment for
     3             interior renovations to Burleigh Hall         214,000
     4             (Base Project Allocation - $214,000)
     5         (D)  Original furniture and equipment,
     6             Humphrey's Hall                               380,000
     7         (E)  Original furniture and equipment,
     8             Emlen Hall                                    495,000
     9     (ii)  Clarion University
    10         (A)  Original furniture and equipment for
    11             Pierce Science Center                       1,980,000
    12         (B)  Original furniture and equipment for
    13             Becht Hall                                    511,000
    14         (C)  Original furniture and equipment for
    15             Marwick-Boyd Fine Arts Center                 709,000
    16     (iii)  Edinboro University
    17         (A)  Additional funds for original
    18             furniture and equipment for renovation
    19             of Butterfield Hall                           180,000
    20             (Base Project Allocation - $180,000)
    21  (6)  DEPARTMENT OF TRANSPORTATION                     $1,950,000  <--
    22     (I)  MATERIALS TESTING LABORATORY, SUMMERDALE
    23         LABORATORY COMPLEX
    24         (A)  ACQUISITION OF MOVABLE FURNITURE AND
    25             EQUIPMENT                                   1,950,000
    26             (BASE PROJECT ALLOCATION - $1,950,000)
    27  Section 5.  Itemization of transportation assistance projects.
    28     (a)  Mass transit.--Additional capital projects in the
    29  category of transportation assistance projects for mass transit
    30  in which an interest is to be acquired or constructed by the
    19990S0572B0686                 - 38 -

     1  Department of Transportation, its successors or assigns, and to
     2  be financed by the incurring of debt, are hereby itemized,
     3  together with their estimated financial costs, as follows:
     4                                                           Total
     5                                                          Project
     6             Project                                    Allocation
     7  (1)  Altoona Mass Transit
     8     (i)  Purchase of four buses                           177,000
     9             (Base Project Allocation - $177,000)
    10  (2)  Area Transportation Authority of North
    11     Central PA
    12     (i)  Construction of a compressed natural gas
    13         fueling station at the DuBois facility            345,000
    14  (3)  Berks Area Reading Transportation Authority
    15     (i)  Intermodal transportation facility               500,000
    16             (Base Project Allocation - $500,000)
    17     (ii)  Acquisition of 15 replacement transit
    18         buses                                             833,000
    19             (Base Project Allocation - $833,000)
    20     (iii)  Acquisition of ten paratransit vehicles        250,000
    21             (Base Project Allocation - $250,000)
    22     (iv)  Development of the Franklin Station Park
    23         and Transit Facility as relates to BARTA
    24         ITF Project                                     3,000,000
    25  (4)  Centre Area Transportation Authority
    26     (i)  Acquisition of bus bike racks and
    27         maintenance items                                  30,000
    28             (Base Project Allocation - $30,000)
    29     (ii)  Purchase small transit buses and related
    30         equipment                                         183,000
    19990S0572B0686                 - 39 -

     1             (Base Project Allocation - $183,000)
     2     (iii)  Facility expansion                             192,000
     3             (Base Project Allocation - $192,000)
     4  (5)  Dubois-Falls Creek, Sandy Township Joint
     5     Transportation Authority (DUFAST)
     6     (i)  Acquisition of new transit buses                 350,000
     7  (6)  Erie Metropolitan Transit Authority
     8     (i)  Acquisition of Rolling Stock                     475,000
     9  (7)  Harrisburg Redevelopment Authority
    10     (i)  Renovations to Harrisburg Transportation
    11         Center                                            416,000
    12             (Base Project Allocation - $416,000)
    13  (8)  County of Lackawanna Transportation System
    14     (i)  Vehicle overhaul and related items                31,000
    15             (Base Project Allocation - $31,000)
    16  (9)  Lehigh and Northampton Transportation
    17     Authority
    18     (i)  Purchase of 30 transit buses                   1,491,000
    19             (Base Project Allocation - $1,491,000)
    20  (10)  Port Authority of Allegheny County
    21     (i)  1997-1998 Title I ISTEA flexible funding         167,000
    22             (Base Project Allocation - $167,000)
    23     (ii)  1998-1999 Title I ISTEA flexible funding        167,000
    24             (Base Project Allocation - $167,000)
    25     (iii)  1999-2000 vehicle overhaul                   5,000,000
    26             (Base Project Allocation - $5,000,000)
    27     (iv)  1999-2000 Infrastructure safety renewal      13,700,000
    28             (Base Project Allocation - $13,700,000)
    29     (v)  1999-2000 Federal Flexible Highway
    30         Spending                                        1,290,000
    19990S0572B0686                 - 40 -

     1             (Base Project Allocation - $1,290,000)
     2     (vi)  1999-2000 Section 9 Program Projects          4,867,000
     3             (Base Project Allocation - $4,867,000)
     4     (vii)  1999-2000 Fixed Guideway Program
     5         Projects                                        4,125,000
     6             (Base Project Allocation - $4,125,000)
     7     (viii)  Light Rail Reconstruction Program          35,000,000
     8             (Base Project Allocation - $35,000,000)
     9     (ix)  North Shore Central Business District
    10         Transportation Project                         39,583,000
    11             (Base Project Allocation - $39,583,00)
    12     (x)  Transit bus procurement                        6,250,000
    13             (Base Project Allocation - $6,250,000)
    14     (xi)  Fiscal year 2000-2001 Infrastructure
    15         Safety Renewal Program (ISRP)                  13,700,000
    16     (xii)  Fiscal year 2001-2002 Infrastructure
    17         Safety Renewal Program (ISRP)                  13,700,000
    18     (xiii)  Fiscal year 2000-2001 vehicle overhaul      5,000,000
    19     (xiv)  Fiscal year 2001-2002 vehicle overhaul       5,000,000
    20     (xv)  Environmental protection                      6,000,000
    21     (xvi)  Fiscal year 2000-2001 Section 9 Program
    22         of Projects                                     5,250,000
    23     (xvii)  Fiscal year 2001-2002 Section 9 Program
    24         of Projects                                     5,667,000
    25     (xviii)  Fiscal year 2000-2001 Fixed Guideway
    26         Modernization Projects                          4,208,000
    27     (xix)  Fiscal year 2001-2002 Fixed Guideway
    28         Modernization Projects                          4,271,000
    29     (xx)  Fiscal year 2000-2001 Federal Flex            1,290,000
    30     (xxi)  Fiscal year 2001-2002 Federal Flex           1,290,000
    19990S0572B0686                 - 41 -

     1     (xxii)  Stage II Light Rail Transit                35,000,000
     2  (11)  Schuylkill Transportation System
     3     (i)  Purchase of automated vehicle location and
     4         mobile data system, Borough of St. Clair          500,000
     5     (ii)  Upgrade vehicle maintenance equipment,
     6         Borough of St. Clair                              125,000
     7     (iii)  Purchase of three new accessible buses
     8         and one new support vehicle for service
     9         expansion                                         375,000
    10  (12)  Southeastern Pennsylvania Transportation
    11     Authority
    12     (i)  Additional funding for Frankford Elevated
    13         Reconstruction                                  6,032,000
    14             (Base Project Allocation - $6,032,000)
    15     (ii)  Additional funding for North Philadelphia
    16         Transportation Center                             203,000
    17             (Base Project Allocation - $203,000)
    18     (iii)  Additional funds for 30th Street Station
    19         Renovations                                       241,000
    20             (Base Project Allocation - $241,000)
    21     (iv)  1999-2000 Flexible Highway Spending           7,109,000
    22             (Base Project Allocation - $7,109,000)
    23     (v)  Additional funds for Frankford
    24         Transportation Center                           1,024,000
    25             (Base Project Allocation - $1,024,000)
    26     (vi)  Additional funds for Paoli Transportation
    27         Center                                            208,000
    28             (Base Project Allocation - $208,000)
    29     (vii)  Silverliner Propulsion System Upgrades         417,000
    30             (Base Project Allocation - $417,000)
    19990S0572B0686                 - 42 -

     1     (viii)  1999-2000 Section 9 Program Projects       10,063,000
     2             (Base Project Allocation - $10,063,000)
     3     (ix)  1999-2000 Fixed Guideway Program
     4         Projects                                       17,637,000
     5             (Base Project Allocation - $17,637,000)
     6     (x)  Schuylkill Valley Metro Infrastructure         6,333,000
     7             (Base Project Allocation - $6,333,000)
     8     (xi)  Cross County Metro                            1,667,000
     9             (Base Project Allocation - $1,667,000)
    10     (xii)  Fiscal year 1998-1999 Vehicle Overhaul
    11         Program                                        40,000,000
    12     (xiii)  Fiscal year 1998-1999 Infrastructure
    13         Safety and Renewal Program                     25,000,000
    14     (xiv)  Fiscal year 1998-1999 Environmental
    15         Cleanup and Protection Program                  2,500,000
    16     (xv)  Fiscal year 1999 Section 9 Formula
    17         Program                                         9,198,000
    18  (13)  Department of Transportation
    19     (i)  Additional funding for the Keystone Rail
    20         Initiative                                      5,000,000
    21             (Base Project Allocation - $5,000,000)
    22     (ii)  Intelligent Vehicle Initiative                1,000,000
    23             (Base Project Allocation - $1,000,000)
    24     (III)  RENOVATION OF ERIE RAIL PASSENGER                       <--
    25         STATION, PLATFORMS AND TUNNELS                    350,000
    26     (IV)  RAIL PASSENGER STATION AT HARRISBURG
    27         INTERNATIONAL AIRPORT                             824,000
    28  (14)  Venango County Transportation Service
    29     (i)  Acquisition of new transit buses                 100,000
    30  (15)  Williamsport Bureau of Transportation
    19990S0572B0686                 - 43 -

     1     (i)  Additional funding for the Central
     2         Business District Trade and Intermodal
     3         Transit Facility                                  750,000
     4             (Base Project Allocation - $750,000)
     5     (b)  Rural and intercity rail.--Additional capital projects
     6  in the category of transportation assistance projects for rural
     7  and intercity rail service projects to be constructed or with
     8  respect to which an interest is to be acquired by the Department
     9  of Transportation, its successors or assigns, and to be financed
    10  by the incurring of debt, are hereby itemized, together with
    11  their respective estimated financial costs, as follows:
    12                                                           Total
    13                                                          Project
    14             Project                                    Allocation
    15  (1)  Allegheny County
    16     (i)  Purchase Rook Yard and right-of-way south
    17         to Bridgeville from Wheeling and Lake Erie
    18         Railroad for use as new transportation
    19         corridor                                       16,500,000
    20     (II)  KISKI JUNCTION RAILROAD, RAIL                            <--
    21         CONSTRUCTION ON THE OLD PENNSYLVANIA
    22         RAILROAD ALLEGHENY BRANCH BETWEEN SCHENLEY
    23         AND FORD CITY                                   3,616,000
    24  (2)  Armstrong County
    25     (i)  Kiski Junction Railroad
    26         (A)  Extension of shortline ten miles to
    27             Ford City                                   5,000,000
    28     (ii)  Pittsburgh and Shawmut Railroad
    29         (A)  Shortline to Conrail at Freeport,
    30             including rail upgrade                      7,500,000
    19990S0572B0686                 - 44 -

     1  (3)  Berks County
     2     (i)  Borough of Topton
     3         (A)  Repair of Conrail crossing gates              60,000
     4  (4)  Butler County
     5     (i)  Acquisition of abandoned rail line from
     6         CSX and extension of rail shortline to
     7         Evans City                                      2,500,000
     8  (5)  Clearfield County
     9     (i)  R. J. Corman Railroad Company
    10         (A)  Rehabilitation of Cherry Tree Branch
    11             Line from Milepost 36 through Milepost
    12             54, inclusive                               2,000,000
    13  (6)  Huntingdon County
    14     (i)  Mount Union Connecting Railroad, rail yard
    15         development and translocation station             100,000
    16  (7)  Luzerne County
    17     (i)  Biscontini Distribution Centers
    18         (A)  Relocate and rehabilitate rail siding
    19             to Biscontini Distribution Center to
    20             handle larger, special purpose rail
    21             cars and to handle increase in volume,
    22             including two rail spurs, an additional
    23             rail switch, preparation of rail
    24             infrastructure and reconstruction of
    25             intermodal yard including access and
    26             temporary storage                             866,000
    27     (ii)  Luzerne County Redevelopment Authority
    28         (A)  Acquisition and rehabilitation of 56-
    29             mile segment of railroad to include
    30             roadbed and track materials from Pocono
    19990S0572B0686                 - 45 -

     1             Northeast Railroad in Luzerne and
     2             Lackawanna Counties                         7,800,000
     3  (8)  Monroe County
     4     (i)  Monroe Rail Authority
     5         (A)  Improvement and upgrade of ten
     6             railroad crossings                          1,500,000
     7         (B)  Construction of an intramodal
     8             transportation facility at Gateway
     9             along I-80                                 25,000,000
    10         (C)  CONSTRUCTION OF INTRAMODAL FACILITY AT                <--
    11             ROUTES 191/447                              1,250,000
    12  (9)  Northampton County
    13     (i)  Beth Intermodal, Inc. and Philadelphia,
    14         Bethlehem and New England Railroad Co.
    15         (PBNE)
    16         (A)  Construction of intermodal facility in
    17             Bethlehem, including Phase I
    18             construction of railroad tracks,
    19             storage, paving, drainage, lighting,
    20             office facilities, placement of
    21             utilities, internal road system to
    22             connect to PA 412 and Interstate 78         6,600,000
    23     (II)  CITY OF BETHLEHEM                                        <--
    24         (A)  TRACK REHABILITATION OF RAIL FOR
    25             BETHLEHEM COMMERCE CENTER                   1,500,000
    26  (10)  Allegheny and Eastern Railroad, Inc.
    27     (i)  Repair and/or rehabilitation of grade
    28         crossings, including tracks, ties,
    29         surfaces, subsurfaces, signals, automatic
    30         or manual protection and any other related
    19990S0572B0686                 - 46 -

     1         work                                              462,000
     2     (ii)  Complete rail rehabilitation from Warren
     3         to Erie, including, but not limited to,
     4         rail, ties, bridge deck repairs and road
     5         crossing improvements                           8,015,000
     6             (Base Project Allocation - $7,287,000)
     7             (Design and Contingencies - $728,000)
     8     (iii)  Complete rail rehabilitation from Warren
     9         to Johnsonburg, including, but not limited
    10         to, replacement of cross and switch ties;
    11         rebuild and replacement of rail and rail
    12         infrastructure and road crossing
    13         improvements                                    3,978,000
    14             (Base Project Allocation - $3,616,000)
    15             (Design and Contingencies - $362,000)
    16     (iv)  Construction of new switch yards along
    17         Allegheny and Eastern Railroad, weed
    18         spraying and rail testing over entire line      1,455,000
    19             (Base Project Allocation - $1,323,000)
    20             (Design and Contingencies - $132,000)
    21  (11)  Allegheny Valley Railroad
    22     (i)  Repair and/or rehabilitation of grade
    23         crossings, including tracks, ties,
    24         surfaces, subsurfaces, signals, automatic
    25         or manual protection and any other related
    26         work                                              207,000
    27     (ii)  Complete rail rehabilitation between New
    28         Kensington and Pittsburgh, including, but
    29         not limited to, rail infrastructure, ties,
    30         tracks, safety improvements, surfaces,
    19990S0572B0686                 - 47 -

     1         subsurfaces, signals and related work           4,000,000
     2  (12)  Bradford Industrial Railroad, Inc.
     3     (i)  Repair and/or rehabilitation of grade
     4         crossings, including tracks, ties,
     5         surfaces, subsurfaces, signals, automatic
     6         or manual protection and any other related
     7         work                                               45,000
     8  (13)  Buffalo and Pittsburgh Railroad, Inc.
     9     (i)  Repair and/or rehabilitation of grade
    10         crossings, including tracks, ties,
    11         surfaces, subsurfaces, signals, automatic
    12         or manual protection and any other related
    13         work                                              508,000
    14     (ii)  Construction of connector for Buffalo and
    15         Pittsburgh Railroad and Western Allegheny
    16         branch south of Karn City                       2,750,000
    17             (Base Project Allocation - $2,500,000)
    18             (Design and Contingencies - $250,000)
    19     (iii)  Rehabilitation of selected areas of
    20         Western Allegheny branch                          440,000
    21             (Base Project Allocation - $400,000)
    22             (Design and Contingencies - $40,000)
    23     (iv)  Rehabilitation of rail line to Petrolia       3,300,000  <--
    24             (Base Project Allocation - $3,000,000)
    25     (IV)  REHABILITATION OF RAIL LINE TO PETROLIA       4,300,000  <--
    26             (BASE PROJECT ALLOCATION - $4,000,000)
    27             (Design and Contingencies - $300,000)
    28  (14)  Delaware and Hudson Railway Co.
    29     (i)  Repair and/or rehabilitation of grade
    30         crossings, including tracks, ties,
    19990S0572B0686                 - 48 -

     1         surfaces, subsurfaces, signals, automatic
     2         or manual protection and any other related
     3         work                                              172,000
     4     (ii)  Construction of terminal for truck on
     5         train service between Philadelphia-
     6         Harrisburg-Allentown markets and Canada,
     7         including access track infrastructure,
     8         terminal track infrastructure, paving,
     9         lighting and other associated improvements
    10         related to such a facility                      7,700,000
    11             (Base Project Allocation - $7,000,000)
    12             (Design and Contingencies - $700,000)
    13     (iii)  Improvements to rail infrastructure,
    14         including, but not limited to, ties, rail,
    15         bridge improvements, safety improvements
    16         needed to improve that portion of mainline
    17         in this Commonwealth to accommodate train
    18         service from and to Canada                      5,500,000
    19             (Base Project Allocation - $5,000,000)
    20             (Design and Contingencies - $500,000)
    21     (iv)  Upgrade and rehabilitate rail track
    22         infrastructure at Philadelphia Naval
    23         Business Center to improve access to
    24         building 603 complex including the
    25         rebuilding of switches and track                  550,000
    26             (Base Project Allocation - $500,000)
    27             (Design and Contingencies - $50,000)
    28     (v)  Rehabilitate rail siding on main line of
    29         Delaware & Hudson Railroad near Nescopeck,
    30         including replacement of turnouts and
    19990S0572B0686                 - 49 -

     1         replacement of signal facilities with solid
     2         state interlockings and associated cabling,
     3         track side signals and electronics                660,000
     4             (Base Project Allocation - $600,000)
     5             (Design and Contingencies - $60,000)
     6     (vi)  Rehabilitate crossing at SR 339 with new
     7         state-of-the-art automatic highway warning
     8         devices and new crossing surface including
     9         track and rail interface materials                259,000
    10             (Base Project Allocation - $235,000)
    11             (Design and Contingencies - $24,000)
    12     (vii)  Rehabilitation of existing track and
    13         construction of new track to service bulk
    14         handling facility module in Lackawanna
    15         County including new switching timbers,
    16         turnouts, track upgrade, including, but not
    17         limited to, track infrastructure materials,
    18         grading, filing, drainage, lighting,
    19         fencing and other associated improvements         495,000
    20             (Base Project Allocation - $450,000)
    21             (Design and Contingencies - $45,000)
    22  (15)  Delaware and Lackawanna Railroad Company
    23     (i)  Repair and/or rehabilitation of grade
    24         crossings including tracks, ties, surfaces,
    25         subsurfaces, signals, automatic or manual
    26         protection and any other related work             630,000
    27  (16)  Emons Transportation Group, Inc.
    28     (i)  Repair and/or rehabilitation of grade
    29         crossings, including tracks, ties,
    30         surfaces, subsurfaces, automatic or manual
    19990S0572B0686                 - 50 -

     1         protection and any other related work
     2         (A)  Maryland and Pennsylvania Railroad           570,000
     3         (B)  Penn Eastern Rail Lines, Inc.,
     4             Lancaster Line                                789,000
     5         (C)  Perkiomen Line                               405,000
     6         (D)  Yorkrail, Inc.                               640,000
     7  (17)  Everett Railroad
     8     (i)  Repair and/or rehabilitation of grade
     9         crossings, including tracks, ties,
    10         surfaces, subsurfaces, automatic or manual
    11         protection and any other related work             270,000
    12  (18)  Gettysburg Railroad Company, Inc.
    13     (i)  Repair and/or rehabilitation of grade
    14         crossings, including tracks, ties,
    15         surfaces, subsurfaces, signals, automatic
    16         or manual protection and any other related
    17         work                                              460,000
    18  (19)  Hollidaysburg and Roaring Spring Railroad
    19     (i)  Repair and/or rehabilitation of grade
    20         crossings, including tracks, ties,
    21         surfaces, subsurfaces, signals, automatic
    22         or manual protection and any other related
    23         work                                              400,000
    24  (20)  Juniata Valley Railroad
    25     (i)  Repair and/or rehabilitation of grade
    26         crossings, including tracks, ties,
    27         surfaces, subsurfaces, signals, automatic
    28         or manual protection and any other related
    29         work                                              133,000
    30  (21)  Lycoming Valley Railroad
    19990S0572B0686                 - 51 -

     1     (i)  Repair and/or rehabilitation of grade
     2         crossings, including tracks, ties,
     3         surfaces, subsurfaces, signals, automatic
     4         or manual protection and any other related
     5         work                                              116,000
     6  (22)  Morrison's Cove Railroad
     7     (i)  Repair and/or rehabilitation of grade
     8         crossings, including tracks, ties,
     9         surfaces, subsurfaces, signals, automatic
    10         or manual protection and any other related
    11         work                                              120,000
    12  (23)  Nittany Bald Eagle Railroad
    13     (i)  Repair and/or rehabilitation of grade
    14         crossings, including tracks, ties,
    15         surfaces, subsurfaces, signals, automatic
    16         or manual protection and any other related
    17         work                                              287,000
    18  (24)  North Shore Railroad
    19     (i)  Repair and/or rehabilitation of grade
    20         crossings, including tracks, ties,
    21         surfaces, subsurfaces, signals, automatic
    22         or manual protection and any other related
    23         work                                               62,000
    24  (25)  Pittsburgh & Shawmut Railroad, Inc.
    25     (i)  Repair and/or rehabilitation of grade
    26         crossings, including tracks, ties,
    27         surfaces, subsurfaces, signals, automatic
    28         or manual protection and any other related
    29         work                                              343,000
    30     (ii)  Rehabilitation of rail infrastructure of
    19990S0572B0686                 - 52 -

     1         13 miles of track between Reesdale and
     2         Freeport to allow a new interchange with
     3         Norfolk Southern Corp.                            715,000
     4             (Base Project Allocation - $650,000)
     5             (Design and Contingencies - $65,000)
     6  (26)  Reading, Blue Mountain and Northern Railroad
     7     Company
     8     (i)  Repair and/or rehabilitation of grade
     9         crossings, including tracks, ties,
    10         surfaces, subsurfaces, signals, automatic
    11         or manual protection and any other related
    12         work                                              850,000
    13     (ii)  CNJ Bridge, track rehabilitation                980,000
    14     (iii)  Construction of crossover track from
    15         track 1 to track 2 and required signal
    16         improvements in Penobscott Yard on the
    17         Lehigh Line                                       140,000
    18     (iv)  Installation of siding and associated
    19         rail improvements, Ontelaunee Township          2,000,000
    20     (V)  CONSTRUCTION OF RAILROAD TRACK, INCLUDING                 <--
    21         SIDINGS, SWITCHES, REQUIRED GRADE
    22         CROSSINGS, FLASHING LIGHTS AND GATES,
    23         RAILROAD BRIDGE REPAIR AND ASSOCIATED RAIL
    24         IMPROVEMENTS BETWEEN MILL CREEK JUNCTION
    25         AND PORT CARBON IN SCHUYLKILL COUNTY            1,250,000
    26  (27)  SEDA-COG Joint Rail Authority
    27     (i)  Repair and/or rehabilitation of grade
    28         crossings, including tracks, ties,
    29         surfaces, subsurfaces, signals, automatic
    30         or manual protection and any other related
    19990S0572B0686                 - 53 -

     1         work
     2         (A)  Juniata Valley Railroad                       50,000
     3         (B)  Lycoming Valley Railroad                     167,000
     4         (C)  Nittany & Bald Eagle                         260,000
     5         (D)  North Shore Railroad                         200,000
     6         (E)  Shamokin Valley Railroad                     127,000
     7  (28)  Shamokin Valley Railroad
     8     (i)  Repair and/or rehabilitation of grade
     9         crossings, including tracks, ties,
    10         surfaces, subsurfaces, signals, automatic
    11         or manual protection and any other related
    12         work                                              672,000
    13  (29)  Southwest Pennsylvania Railroad
    14     (i)  Construction of connector/interchange in
    15         Everson to connect the Southwest
    16         Pennsylvania Railroad and the Wheeling and
    17         Lake Erie Railway Company                         850,000
    18  (30)  Wellsboro and Corning Rail Line
    19     (i)  Repair and/or rehabilitation of grade
    20         crossings, including tracks, ties,
    21         surfaces, subsurfaces, signals, automatic
    22         or manual protection and any other related
    23         work                                               86,000
    24  (31)  Wheeling and Lake Erie Railway Company
    25     (i)  Repair and/or rehabilitation of grade
    26         crossings, including tracks, ties,
    27         surfaces, subsurfaces, signals, automatic
    28         or manual protection and any other related
    29         work                                              645,000
    30     (ii)  Repair and/or rehabilitation of steel
    19990S0572B0686                 - 54 -

     1         lower support system to bridges over PA 88
     2         and Highway 19 and bridge at Gladden,
     3         including tracks, ties, surfaces,
     4         subsurfaces, signals, automatic or manual
     5         protection and any other related work           3,325,000
     6  (32)  NORFOLK SOUTHERN/CONRAIL                                    <--
     7     (I)  DAUPHIN COUNTY
     8         (A)  RUTHERFORD INTERMODAL YARD,
     9             CONSTRUCTION OF A NEW MAJOR INTERMODAL
    10             TERMINAL                                   15,500,000
    11     (II)  PHILADELPHIA COUNTY
    12         (A)  CONSTRUCTION OF A NEW INTERMODAL
    13             TERMINAL AT THE NAVY YARD                   5,700,000
    14         (B)  CONSTRUCTION OF AN AUTOMOBILE STORAGE
    15             AND STAGING TERMINAL AT THE NAVY YARD       7,500,000
    16     (III)  INDIANA COUNTY
    17         (A)  KEYSTONE BUILDOUT, INCLUDING A 4.5
    18             MILE NEW RAIL BUILDOUT BETWEEN
    19             SALTSBURG AND CLARKSBURG AND THE
    20             REHABILITATION OF A 12-MILE LINE
    21             BETWEEN CLARKSBURG AND SHELOCTA             7,500,000
    22         (B)  MISSION BUILDOUT, INCLUDING
    23             REHABILITATION OF 5.7 MILES OF RAIL
    24             LINE FROM BLAIRSVILLE TO BLACK LICK AND
    25             CONSTRUCTION OF A BELT SYSTEM AND
    26             ASSOCIATED FACILITY                         6,000,000
    27     (c)  Air transportation.--Additional capital projects in the
    28  category of transportation assistance projects for air
    29  transportation service to which an interest is to be acquired by
    30  the Department of Transportation, its successors or assigns, and
    19990S0572B0686                 - 55 -

     1  to be financed by the incurring of debt are hereby itemized,
     2  together with their respective estimated financial costs, as
     3  follows:
     4                                                           Total
     5                                                          Project
     6             Project                                    Allocation
     7  (1)  Allegheny County
     8     (i)  Pittsburgh International Airport
     9         (A)  Maintenance complex, development of a
    10             state-of-the-art maintenance facility
    11             for US Airways                            100,000,000
    12     (ii)  West Penn Airport
    13         (A)  Site preparation and infrastructure        3,000,000
    14  (2)  Bradford Regional Airport Authority
    15     (i)  Improvements to airport, including, but
    16         not limited to, runways, taxiways, hangars
    17         and other facilities                            4,115,000
    18  (3)  Butler County Airport
    19     (i)  Expansion of airport facilities including
    20         runway extension and expansion                  3,600,000
    21     (ii)  Construction of aircraft storage hangar         320,000
    22     (iii)  Replace roof on existing aircraft
    23         storage hangar                                     80,000
    24     (iv)  Convert former shop and storage area to
    25         office space                                       75,000
    26     (v)  Ramp improvements for main area terminal
    27         and hangar No.3                                   280,000
    28     (vi)  Construct northwest ramp and associated
    29         taxiways                                          650,000
    30     (vii)  Runway extension                               350,000
    19990S0572B0686                 - 56 -

     1  (4)  Corry-Lawrence Airport Authority
     2     (i)  Improvements to airport, including, but
     3         not limited to, runways, taxiways, hangars
     4         and other facilities                            1,375,000
     5  (5)  DuBois-Jefferson County Airport
     6     (i)  Improvements to airport, including, but
     7         not limited to, runways, taxiways, hangars
     8         and other facilities                            1,855,000
     9  (6)  Indiana County
    10     (i)  Indiana County Jimmy Stewart Airport
    11         (A)  Extension of the existing runway, full
    12             instrument landing system                   8,450,000
    13  (6.1)  LYCOMING COUNTY AIRPORT                                    <--
    14     (I)  REPAIR AND REPLACEMENT OF HANGAR
    15         FACILITIES                                      1,000,000
    16  (7)  Monroe County
    17     (i)  Pocono Mountains Municipal Airport
    18         Authority
    19         (A)  Construction of new terminal, hangar
    20             and other airport improvements              2,100,000
    21  (8)  Northampton County
    22     (i)  Lehigh Valley International Airport
    23         (A)  Land acquisition and runway
    24             development                                10,000,000
    25  (9)  Pottstown Municipal Airport
    26     (i)  Replace airport hangars destroyed by
    27         winter storms                                     180,000
    28  (10)  Reading Regional Airport Authority
    29     (i)  Capital improvements                           5,000,000
    30     (ii)  Rehabilitate and expand terminal
    19990S0572B0686                 - 57 -

     1         building                                        3,500,000
     2     (III)  NORTH APRON SITE PREPARATION FOR T-                     <--
     3         HANGARS                                           100,000
     4     (IV)  SOUTH APRON SITE PREPARATION FOR
     5         CORPORATE HANGAR                                  300,000
     6     (V)  EXPAND SNOW REMOVAL EQUIPMENT BUILDING           250,000
     7     (VI)  INSTALL ABOVE GROUND FUEL TANKS FOR
     8         AIRPORT EQUIPMENT                                  30,000
     9     (VII)  REHABILITATE SANITARY SEWER                    350,000
    10     (VIII)  REPLACE FIRE HYDRANTS                          50,000
    11     (IX)  REHABILITATE WATER DISTRIBUTION CENTER          250,000
    12     (X)  RENOVATE AND EXPAND WASTE WATER TREATMENT
    13         PLANT                                             350,000
    14  (11)  St. Marys Area Airport Authority
    15     (i)  Improvements to airport, including, but
    16         not limited to, runways, taxiways, hangars
    17         and other facilities                              840,000
    18  (12)  Venango Regional Airport
    19     (i)  Acquire aircraft ground service equipment
    20         and construct storage building                    150,000
    21     (ii)  Seal and rejuvenate taxiways D and F            150,000
    22     (iii)  Refurbish hangar and install new hangar
    23         door                                              150,000
    24     (iv)  Repave runway                                   900,000
    25     (v)  Easement and property acquisition                350,000
    26     (vi)  Obstruction removal                             110,000
    27     (vii)  Extension of runway                          4,000,000
    28     (viii)  Development of hangar taxiway and
    29         hangar site                                     1,900,000
    30     (ix)  Construct T hangars                             400,000
    19990S0572B0686                 - 58 -

     1  (13)  York County
     2     (i)  York Aviation Inc.
     3         (A)  Demolition of old hangars and
     4             construction of new hangars at new
     5             location                                      850,000
     6  Section 6.  Itemization of redevelopment assistance projects.
     7     Additional capital projects in the category of redevelopment
     8  assistance projects for capital grants by the Department of
     9  Community and Economic Development, its successors or assigns,
    10  authorized under the provisions of the act of May 20, 1949
    11  (P.L.1633, No.493), known as the Housing and Redevelopment
    12  Assistance Law, and redevelopment assistance capital projects
    13  and to be financed by the incurring of debt, are hereby
    14  itemized, together with their estimated financial costs, as
    15  follows:
    16                                                           Total
    17                                                          Project
    18             Project                                    Allocation
    19  (1)  Adams County
    20     (i)  Gettysburg
    21         (A)  Renovation of the Majestic Theater         5,700,000
    22  (2)  Allegheny County
    23     (i)  City of Pittsburgh
    24         (A)  National Aviary - construction of Ends
    25             of the Earth Exhibit and Education
    26             Center                                      3,500,000
    27         (B)  National Aviary - construction of
    28             African Savanna Exhibit                     2,750,000
    29         (C)  National Aviary - construction of
    30             Parrot World                                1,750,000
    19990S0572B0686                 - 59 -

     1         (D)  National Aviary - construction of
     2             Terrors of the Night, Owl Exhibit           1,250,000
     3         (E)  National Aviary - construction of
     4             North American Flyway, Hummingbird,
     5             Butterfly and Macaw Clay Lick Exhibits      2,250,000
     6         (F)  National Aviary - construction of
     7             Waterfowl Exhibit                           2,250,000
     8         (G)  National Aviary - construction of Bird
     9             Theater Complex                             2,000,000
    10         (H)  Pittsburgh Zoo - renovation and
    11             expansion of Aquarium                       7,850,000
    12         (I)  Pittsburgh Zoo - construction of South
    13             America and Asia Exhibits                   4,200,000
    14         (J)  Pittsburgh Zoo - construction of
    15             Animal Health and Research Complex          2,400,000
    16         (K)  Pittsburgh Zoo - construction of
    17             Aquatic Pavilion                            4,200,000
    18         (L)  Pittsburgh Supercomputing Center
    19             Projects
    20             (I)  Memory capacity upgrade for the
    21                 Cray T3E massively parallel
    22                 computer                                2,000,000
    23             (II)  Purchase of new vecter-scale
    24                 computer to replace the Cray C90          900,000
    25         (M)  Public Auditorium Authority
    26             (I)  Construction of a new facility to
    27                 replace the Civic Arena                60,000,000
    28         (N)  ACQUISITION AND RENOVATIONS TO THE                    <--
    29             FORMER BUHL PLANETARIUM FOR PURPOSES OF
    30             ITALIAN AMERICAN CULTURAL CENTER            1,000,000
    19990S0572B0686                 - 60 -

     1     (ii)  County Projects
     2         (A)  Meadowcroft Rock Shelter, renovation
     3             of visitors' access and exhibit
     4             development                                 2,000,000
     5         (B)  Redevelopment of the former USX
     6             Duquesne Plant                             14,486,000
     7         (C)  East Liberty industrial/commercial
     8             acquisition and development including
     9             site preparation and infrastructure
    10             improvements                                6,000,000
    11         (D)  Homewood industrial/commercial site
    12             acquisition and preparation                 4,000,000
    13         (E)  Lawrenceville industrial site
    14             acquisition and development                 5,000,000
    15         (F)  Eastgate Commerce Center
    16             redevelopment, including the
    17             development of the Industry Road
    18             Complex, rehabilitation of the Pipe
    19             Mill, Phase II of the McKees Point
    20             Marina and the rehabilitation of the
    21             Lysle Boulevard and Sixth Avenue
    22             parking garages                             5,000,000
    23         (G)  Carnegie Furnace brownfield
    24             redevelopment                              20,000,000
    25         (H)  Clairton commercial/industrial
    26             redevelopment                              15,000,000
    27         (I)  Mixed use development of a parcel
    28             adjacent to the Fawn Township Municipal
    29             Building, Fawn Township                     2,202,000
    30         (J)  West Penn Airport site preparation         3,000,000
    19990S0572B0686                 - 61 -

     1         (K)  Braddock industrial site - acquisition
     2             and demolition of vacant residential
     3             properties located in the Borough of
     4             Braddock for industrial reuse              20,000,000
     5         (L)  Airport Maintenance Complex and
     6             Training Facility                         100,000,000
     7         (M)  Glassport redevelopment                    7,500,000
     8         (N)  Expansion of the Pittsburgh Technology
     9             Center                                      4,300,000
    10         (O)  McKeesport multi-occupancy building
    11             construction                                2,569,000
    12         (P)  Mixed use development 7th and
    13             Duquesne, including parking garage and
    14             cabaret theater and restaurant              2,700,000
    15         (Q)  Pittsburgh Air and Space Museum           55,000,000  <--
    16         (Q)  RENOVATIONS TO PHIPPS CONSERVATORY         5,000,000  <--
    17         (R)  Industry Drive corridor site
    18             preparation                                 2,900,000
    19         (S)  Development of Frazier Height Galleria
    20             Mall and business park including
    21             construction of interchange on Route
    22             28                                          2,500,000
    23         (T)  Development of technology park
    24             including office, research and
    25             development and residential components,
    26             Marshall Township                           5,000,000
    27         (U)  Baptist Road Park                            100,000
    28         (V)  Beetle Park rehabilitation, Jefferson
    29             Hills                                          95,000
    30         (W)  Bethel Park Community Center                 100,000
    19990S0572B0686                 - 62 -

     1         (X)  Boyce/Mayview property redevelopment -
     2             Nature Education Center                     2,000,000
     3         (Y)  Carnegie Free Library - rehabilitation
     4             of the Grand Army Republic Room               500,000
     5         (Z)  Carnegie Mall, Phase II                    1,036,000
     6         (AA)  Construction of building for the
     7             Jefferson Hills Fire Department             1,000,000
     8         (BB)  Pittsburgh First Night                      225,000
     9         (CC)  Carnegie Science Center, renovation                  <--
    10             and expansion                              29,421,000
    11         (CC)  CARNEGIE SCIENCE CENTER, SITE                        <--
    12             DEVELOPMENT AND CONSTRUCTION FOR
    13             ADDITION FOR EXPANDED EXHIBIT AREAS        35,000,000
    14         (DD)  Pittsburgh Children's Museum,
    15             renovation and expansion                   10,000,000
    16         (EE)  Carnegie Museum of Art and Museum of
    17             Natural History, renovations                5,500,000
    18         (FF)  Carrie Furnace brownfield
    19             redevelopment, redevelopment of the
    20             former USX Carrie Furnace site in
    21             Rankin                                     20,000,000
    22         (GG)  Glenwood/Hazelwood industrial site
    23             acquisition                                 7,500,000
    24         (HH)  Sandcastle Amphitheater, expansion of
    25             the Sandcastle recreation complex to
    26             include a 5,000 seat riverside
    27             amphitheater and additional parking         3,000,000
    28         (II)  Convention Center Hotel, development
    29             of a major hotel in conjunction with
    30             the Convention Center expansion            27,000,000
    19990S0572B0686                 - 63 -

     1         (JJ)  McKeesport City Center redevelopment      6,590,000
     2         (KK)  Pittsburgh Entertainment Technology
     3             Park, development                          10,000,000
     4         (LL)  Borough of Churchill, development of
     5             a multipurpose facility for the
     6             Boroughs of Chalfant, Forest Hills,
     7             Churchill and Wilkins Township              2,000,000
     8         (MM)  McKees Point Project, renovation of
     9             the former Pipe Mill, completion of
    10             McKees Point                                1,500,000
    11         (NN)  Braddock, Rankin, North Braddock
    12             industrial site assembly, assembling
    13             vacant residential property in the
    14             communities for redevelopment into
    15             industrial sites                           20,000,000
    16         (OO)  Brentwood Redevelopment Project,
    17             redevelopment of Saw Mill Run Corridor      5,000,000
    18         (PP)  Carlow College Center for Science and
    19             Technology, development of new center       6,550,000
    20         (QQ)  Clairton Redevelopment Project,
    21             redevelopment of 80-acre industrial
    22             site along Route 837                       15,000,000
    23         (RR)  Collier Township site development,
    24             development of 450-acre mixed use site     12,500,000
    25         (SS)  Destination retail/entertainment on
    26             North Side, development of major retail
    27             and entertainment attractions between
    28             the baseball park and the new football
    29             stadium                                    15,000,000
    30         (TT)  Federal North Offices, acquisition
    19990S0572B0686                 - 64 -

     1             and redevelopment of 47 properties in a
     2             two block area on Pittsburgh's North
     3             Side                                        2,500,000
     4         (UU)  Federal North Performing Arts,
     5             development of a performing arts center
     6             in the Federal North Redevelopment
     7             Project                                     1,150,000
     8         (VV)  Glassport Industrial Center,
     9             acquisition and infrastructure              5,000,000
    10         (WW)  Kennywood site development,
    11             acquisition and site development            3,500,000
    12         (XX)  Leetsdale overpass, construction of
    13             an overpass to provide access and
    14             egress to the Leetsdale Industrial
    15             Park                                        3,300,000
    16         (YY)  McKeesport Development Project,
    17             redevelopment of the former McKeesport
    18             National Works site into the Riverplace
    19             and other commercial improvements           6,590,000
    20         (ZZ)  McKeesport Development Project,
    21             multi-occupancy building, development
    22             of a 30,000-square-foot speculative
    23             industrial building on the site of the
    24             former USX McKeesport National Works
    25             site                                        2,569,000
    26         (AAA)  North Shore Amphitheater,
    27             development of a new amphitheater           5,000,000
    28         (BBB)  O'Reilly Theater, development of the
    29             facility for the Pittsburgh Public
    30             Theater                                     9,500,000
    19990S0572B0686                 - 65 -

     1         (CCC)  Pittsburgh Technology Center,
     2             redevelopment of the former J & L Hot
     3             Strip Mill on 2nd Avenue                    4,280,000
     4         (DDD)  Roswell Park, redevelopment of the
     5             former Hornes Warehouse in Farrywood        1,251,000
     6         (EEE)  RPS-Neville Island, redevelopment of
     7             the 38-acre Neville Island on the Ohio
     8             River                                       2,850,000
     9         (FFF)  Station Square Entertainment
    10             Facility, development of a new
    11             entertainment and recreation venue
    12             adjacent to the existing Station Square
    13             across from the Central Business
    14             District                                    1,750,000
    15         (GGG)  Station Square Hotel, development of
    16             a new hotel                                12,000,000
    17         (HHH)  Renovation and expansion to existing
    18             sound stage in Trafford and
    19             construction of post-production
    20             facility                                    1,235,000
    21         (III)  MANCHESTER YOUTH DEVELOPMENT CENTER                 <--
    22             FOR FACILITY RENOVATIONS                    1,000,000
    23     (iii)  Allegheny County Hospital Development
    24         Authority
    25         (A)  Children's Hospital of Pittsburgh,
    26             renovations and improvements of 6th
    27             floor operating room and ICU               10,700,000
    28         (B)  Children's Hospital of Pittsburgh,
    29             renovations of existing emergency
    30             department and new second floor patient
    19990S0572B0686                 - 66 -

     1             care areas                                  4,700,000
     2  (3)  Armstrong County
     3     (i)  County Projects
     4         (A)  Crooked Creek Horse Park, construction
     5             of a coliseum                                 750,000
     6         (B)  Apollo Industrial Reuse Project,
     7             redevelopment of a 19-acre brownfield
     8             site                                          500,000
     9         (C)  Armstrong County multitenant facility,
    10             construction of a 30,000-square-foot
    11             multitenant facility within the Slate
    12             Lick Industrial Park                          950,000
    13         (D)  Ford City Borough Industrial Reuse
    14             Project, reuse of the former PPG site
    15             and MAC Park                                3,000,000
    16         (E)  Parks Bend Farms Industrial Park,
    17             continuation of industrial park build-
    18             out                                         2,000,000
    19         (F)  Schenley Industrial Park, railroad
    20             yard improvements in the park               1,000,000
    21         (G)  Slate Lick Industrial Park,
    22             development of the Planned Mixed Use
    23             Community                                   3,000,000
    24         (H)  West Hills - Multitenant facility,
    25             development of a 30,000-square-foot
    26             multi-occupancy building in the West
    27             Hills Industrial Park                       1,850,000
    28         (I)  West Hills Industrial Park expansion       3,800,000
    29  (4)  Beaver County
    30     (i)  County Projects
    19990S0572B0686                 - 67 -

     1         (A)  Hopewell business and industrial site,
     2             site improvements                           1,500,000  <--
     3         (B)  Aliquippa industrial site, development
     4             of a public port facility                   3,500,000
     5             SITE IMPROVEMENTS                           3,000,000  <--
     6         (B)  ALIQUIPPA INDUSTRIAL SITE DEVELOPMENT      5,000,000
     7         (C)  B & W site redevelopment, site
     8             improvement                                 5,000,000
     9         (D)  Route 60 North Business Park, site
    10             improvements and acquisition                2,500,000
    11         (E)  Route 18 business park, site
    12             improvements                                2,500,000
    13         (F)  Monaca redevelopment site, site
    14             acquisition                                 1,000,000
    15         (G)  Ohio River Mixed Use Project, site
    16             improvements                                2,500,000
    17         (H)  Conference Center, site improvements       1,000,000  <--
    18         (I)  Aliquippa industrial site, Phase II
    19             redevelopment                               5,000,000
    20         (J)  Ambridge Regional Distribution Center,
    21             development of new industrial sites on
    22             the former Ambridge Works site              2,500,000
    23         (K)  Bet Tech Industrial Park,
    24             redevelopment of the former LTV Works       7,500,000
    25         (L)  Route 18 Corridor, development of new
    26             industrial sites along Route 18             1,500,000
    27         (M)  Tri-county Industrial Park,
    28             development of new industrial park          3,200,000
    29         (H)  HOTEL CONFERENCE CENTER, SITE                         <--
    30             IMPROVEMENTS                                1,000,000
    19990S0572B0686                 - 68 -

     1         (I)  SITE IMPROVEMENTS TO HYDRIL PROPERTY
     2             IN ROCHESTER TOWNSHIP FOR DEVELOPMENT
     3             OF A MULTI-USE, COUNTYWIDE, RECREATION
     4             AND ENTERTAINMENT CENTER                    2,000,000
     5         (J)  SITE IMPROVEMENT FOR GOVERNOR'S PARK
     6             PROJECT IN NEW SEWICKLEY TOWNSHIP           5,000,000
     7  (5)  Bedford County
     8     (i)  County Projects
     9         (A)  Construction of Old Bedford Village
    10             Cultural Heritage Center, including
    11             displays on Native American heritage in
    12             South-Central Pennsylvania                  2,000,000
    13         (B)  Bedford Springs Hotel and Resort,
    14             Phase II                                   16,000,000
    15         (C)  Bedford County Business Park multi-
    16             tenant facility                             1,500,000
    17         (D)  BEDFORD COUNTY BUSINESS PARK, PHASE                   <--
    18             II                                          5,000,000
    19  (6)  Berks County
    20     (i)  City of Reading
    21         (A)  Berks County Convention Center             8,000,000
    22         (B)  Improvements to Reading Municipal
    23             Memorial Stadium                            4,800,000
    24         (C)  Improvements to the Regional Training
    25             Facility for police and safety
    26             personnel                                   7,500,000
    27     (ii)  Cumru Township
    28         (A)  Improvements to the Fire Training
    29             Center Burn Building                        2,500,000
    30     (iii)  Township of Greenwich
    19990S0572B0686                 - 69 -

     1         (A)  Renovation of existing building for
     2             township office and meeting room              250,000
     3     (iv)  Borough of Topton
     4         (A)  Upgrade of the Sewage Treatment Plant      2,210,000
     5     (v)  Borough of Bernville
     6         (A)  Upgrade of the Sewage Treatment Plant      3,700,000
     7  (7)  Blair County
     8     (i)  City of Altoona
     9         (A)  ABCD Entrepreneurial Center                2,500,000
    10         (B)  Altoona Heritage Discovery Center,
    11             development of a downtown economic and
    12             educational mixed use facility              3,750,000
    13         (C)  Altoona Transportation Gateway
    14             Project                                     5,000,000
    15         (D)  Central business district parking
    16             garage complex                              2,500,000
    17     (ii)  County Projects
    18         (A)  Blair County baseball field and
    19             stadium, Phase II                           2,200,000
    20         (B)  I-99 Corridor - development of
    21             Business/Technology Park including
    22             access improvement, land acquisition,
    23             site development and water, sewer and
    24             utility extensions                         10,000,000
    25         (C)  Northern I-99 Enterprise Zone
    26             Development Project including the
    27             Tyrone Gateway, Vail Bald Eagle
    28             Business Park and Tipton Corridor
    29             redesign and access improvements            7,500,000
    30         (D)  Northern I-99 Enterprise Zone -
    19990S0572B0686                 - 70 -

     1             rehabilitation and upgrade of
     2             underutilized industrial sites              4,000,000
     3         (E)  Tyrone Streetscape, Borough of Tyrone      4,500,000
     4  (8)  Bradford County
     5     (i)  Towanda Township
     6         (A)  Towanda Central Business District
     7             enhancement, planning and construction     23,270,000
     8     (ii)  Borough of Sayre
     9         (A)  Civic improvement and reconstruction
    10             project                                     3,214,000
    11  (9)  Bucks County
    12     (i)  Middletown Township
    13         (A)  Municipal building/police
    14             headquarters                                5,500,000
    15     (ii)  County Projects
    16         (A)  Lower Bucks Regional History and
    17             Culture Center                              6,000,000
    18         (B)  James A. Michener Library                  2,000,000
    19         (C)  ACQUISITION OF VAN SANT AIRPORT                       <--
    20             PROPERTY FOR PRESERVATION AND
    21             DESIGNATION AS A HISTORIC AIRFIELD            750,000
    22     (iii)  Bristol Township
    23         (A)  Improvements to Municipal Building         2,000,000
    24         (B)  Construction of Community Center in
    25             Croydon Section                             2,400,000
    26     (iv)  Morrisville Borough
    27         (A)  Restoration of 1896 Pumphouse
    28             Facility                                    1,200,000
    29     (v)  Doylestown Borough
    30         (A)  Expansion of James A. Michener Art
    19990S0572B0686                 - 71 -

     1             Museum                                      3,000,000
     2         (B)  Parking garage to be used for visitor
     3             parking for the Mercer Museum, James A.
     4             Michener Art Museum and the Bucks
     5             County Free Library                         3,000,000
     6         (C)  Creation of bike and hike trail            3,000,000
     7         (D)  Land acquisition for preservation of
     8             open space adjacent to Delaware Valley
     9             College                                     3,000,000
    10     (vi)  Northampton Township
    11         (A)  Richboro 2000 - downtown restoration
    12             program                                     1,000,000
    13     (VII)  UPPER SOUTHAMPTON TOWNSHIP                              <--
    14         (A)  INFRASTRUCTURE IMPROVEMENTS AND
    15             CAPITAL ACQUISITIONS                        3,700,000
    16  (10)  Butler County
    17     (i)  County Projects
    18         (A)  Expansion of Butler Community
    19             Development Corporation water system at
    20             the Butler County Business Park to
    21             other key sites                             1,988,000
    22         (B)  Expansion of water lines for 400 acre
    23             site for business park, Chicora
    24             Borough                                     1,000,000
    25         (C)  Butler County Arts Center                  3,300,000
    26         (D)  Construction of the Butler County Fire
    27             School and acquisition of original
    28             equipment                                   1,000,000  <--
    29             EQUIPMENT                                   1,638,000  <--
    30     (ii)  City of Butler
    19990S0572B0686                 - 72 -

     1         (A)  Renovation of Central Museum and
     2             upgrade of preservation status of
     3             companion properties of historical
     4             significance                                1,000,000
     5         (B)  Development of vacant acreage at the
     6             Pullman Standard site including
     7             renovations to remaining Pullman
     8             Standard buildings                          1,825,000
     9         (C)  Restoration of Butler County Prison
    10             Annex                                         350,000
    11         (D)  Construction of Ice Rink Sports
    12             Center                                      2,000,000
    13     (iii)  Penn Township
    14         (A)  Sewer improvements                         4,000,000
    15     (iv)  Middlesex Township
    16         (A)  Sewer improvements                        10,000,000
    17     (v)  Adams Township
    18         (A)  Sewer improvements                           600,000
    19     (vi)  West Sunbury
    20         (A)  Water system improvements                    500,000
    21     (vii)  Butler County Community College
    22         (A)  Construction of a new running track
    23             and baseball field                            290,000
    24     (viii)  Lyndora Borough
    25         (A)  Construction of American Legion
    26             Community Center including
    27             infrastructure improvements and land
    28             acquisition                                 1,000,000
    29  (11)  Cambria County
    30     (i)  County Projects
    19990S0572B0686                 - 73 -

     1         (A)  Acquisition and renovations for the
     2             Manufacture Water Company                   2,000,000
     3     (ii)  Loretto Borough
     4         (A)  Southern Alleghenies Museum of Art         5,000,000
     5     (III)  ADAMS TOWNSHIP                                          <--
     6         (A)  RENOVATION AND SITE DEVELOPMENT OF
     7             SAINT MICHAEL HERITAGE DISTRICT             1,400,000
     8  (12)  Cameron County
     9     (i)  County Projects
    10         (A)  Renovation and addition of the Cameron
    11             County Courthouse and Annex building        3,000,000
    12         (B)  Upgrade to the Mid-Cameron County
    13             Authority Sewage Treatment Plant            3,350,000
    14  (13)  Centre County
    15     (i)  Centre Region Council of Governments
    16         (A)  Construction of a Centre County Safety
    17             Training Facility                           2,018,000
    18     (ii)  Moshannon Valley Economic Development
    19         Partnership
    20         (A)  Construction of an industrial site on
    21             land located along PA Route 322, east
    22             of Phillipsburg                             1,865,000
    23     (iii)  Chamber of Business and Industry of
    24         Centre County
    25         (A)  Development of Phase III of the Penn
    26             Eagle Industrial Park                       1,741,000
    27     (iv)  Centre County Convention and Visitors
    28         Bureau
    29         (A)  Construction of a visitors center          3,000,000
    30     (v)  Borough of State College
    19990S0572B0686                 - 74 -

     1         (A)  Construction of a community activity
     2             facility within the planned town
     3             center                                      2,000,000
     4  (14)  Chester County
     5     (i)  Chester County Intermediate Unit
     6         (A)  Provide fiber optic lines to all
     7             public schools in Chester County for
     8             video instruction, communications and
     9             data management                             4,700,000
    10     (ii)  County Projects
    11         (A)  Preservation of the Brandywine
    12             Battlefield, Meetinghouse Road Corridor
    13             including land acquisition and the
    14             acquisition of easements                    6,000,000
    15     (iii)  Chester County Historical Society
    16         (A)  Acquisition and renovation of a
    17             collection storage facility                 1,000,000
    18     (iv)  Malvern Borough
    19         (A)  Preservation of the Paoli Battlefield
    20             including the acquisition of land           3,000,000
    21     (V)  AMERICAN HELICOPTER MUSEUM AND EDUCATION                  <--
    22         CENTER
    23         (A)  BUILDING ACQUISITION AND RENOVATION        1,000,000
    24  (15)  Clarion County
    25     (i)  County Projects
    26         (A)  Construction of community YMCA
    27             facility                                    3,700,000
    28         (B)  Infrastructure development including
    29             the installation of water and sewer
    30             lines and construction of roadways,
    19990S0572B0686                 - 75 -

     1             Beaver Township Industrial Park             1,068,000
     2         (C)  Freeman Institute of Sustainable
     3             Forestry - construction and renovation
     4             of facilities and procurement of
     5             training equipment                          3,025,000
     6  (16)  Clearfield County
     7     (i)  City of DuBois
     8         (A)  Shopping center land acquisition           4,000,000
     9     (ii)  DuBois Education Foundation
    10         (A)  Acquisition and renovation of the
    11             IDEAL property for future educational
    12             use                                         4,000,000
    13     (iii)  Dubois Area Economic Development
    14         Corporation
    15         (A)  Construction of a business incubator       1,500,000
    16     (IV)  CLEARFIELD BOROUGH                                       <--
    17         (A)  ACQUISITION AND CONSTRUCTION OF A
    18             MULTITENANT BUILDING AT HARVEST WALKER
    19             KEYSTONE OPPORTUNITY ZONE FOR
    20             INDUSTRIAL USE                              1,000,000
    21  (17)  Clinton County
    22     (i)  Clinton County Economic Partnership
    23         (A)  Acquisition of land and development of
    24             industrial park near Interstate 80 in
    25             Lamar Township                              2,000,000
    26  (18)  Crawford County
    27     (i)  County Projects
    28         (A)  Construction of stadium, City of
    29             Meadville                                   1,100,000
    30         (B)  Rail Heritage Center                       2,580,000
    19990S0572B0686                 - 76 -

     1         (C)  Titusville Industrial Park rail
     2             improvements                                2,000,000
     3         (D)  Titusville Industrial Park
     4             infrastructure improvements                 2,000,000
     5     (ii)  Titusville Borough
     6         (A)  Downtown revitalization - town square
     7             area                                        1,000,000
     8     (iii)  Greenwood Township
     9         (A)  Industrial park improvements               3,500,000
    10  (19)  Cumberland County
    11     (i)  County Projects
    12         (A)  Construction of an Army Museum on land
    13             adjacent to the U.S. Military
    14             Reservation, Carlisle Barracks             25,000,000
    15  (20)  Dauphin County
    16     (i)  County Projects
    17         (A)  Restoration and renovation of
    18             Harrisburg Community Theatre, Hurlock
    19             Street facility                               500,000
    20         (B)  Construction of Ned Smith Center for
    21             Nature and Art, Upper Paxton Township       2,500,000
    22     (ii)  Susquehanna Township
    23         (A)  Construction of new Edgemont Fire
    24             Station                                       500,000
    25     (iii)  Swatara Township
    26         (A)  Construction of new Lawnton Fire
    27             Station                                       500,000
    28     (iv)  City of Harrisburg
    29         (A)  Construction of a national Civil War
    30             and Post-Civil War Museum                  16,400,000
    19990S0572B0686                 - 77 -

     1         (B)  Construction and development of the
     2             Pennsylvania Sports Hall of Fame
     3             Museum, City Island                         5,000,000
     4         (C)  Expansion and improvements to
     5             Riverside Stadium                           4,000,000
     6  (21)  Elk County
     7     (i)  City of St. Marys
     8         (A)  Land acquisition, site preparation and
     9             construction of the St. Marys Community
    10             Center                                      6,200,000
    11         (B)  Construction of the Elk Creek sewer
    12             interceptor                                 2,500,000
    13         (C)  Downtown infrastructure improvements       3,400,000
    14     (ii)  St. Marys Redevelopment Authority
    15         (A)  Acquisition and revitalization of the
    16             St. Marys downtown commercial district      1,200,000
    17     (iii)  North Central Planning and Development
    18         Commission
    19         (A)  Construction of the Eastern Elk
    20             Heritage Park/Big Game Visitors Center      7,200,000
    21  (22)  Erie County
    22     (i)  Lake Erie College of Osteopathic Medicine
    23         (A)  Multipurpose building to house a
    24             medical library, student union and
    25             classrooms                                 14,800,000
    26     (ii)  City of Corry
    27         (A)  Construction of bike/hike trails           1,000,000
    28         (B)  Construction of the Corry Outdoor
    29             Recreation Complex                          2,400,000
    30         (C)  Development of the Virtual
    19990S0572B0686                 - 78 -

     1             Infrastructure Project at the Phase II
     2             - Corry Industrial Park                     2,500,000
     3         (D)  High Technology Education and Training
     4             Laboratory                                  1,500,000
     5         (E)  Infrastructure improvements between
     6             Lowville and Route 17                      20,000,000
     7     (iii)  City of Corry Redevelopment Authority
     8         (A)  Corry downtown renovation project          1,000,000
     9         (B)  PURCHASE AND ACQUISITION OF A FACILITY                <--
    10             FOR CONVERSION TO A
    11             MULTITENANT/INCUBATOR FACILITY IN THE
    12             CITY OF CORRY                               2,200,000
    13     (iv)  Corry Area Industrial Development
    14         Corporation
    15         (A)  Corry industrial park expansion            1,000,000
    16         (B)  Development of a Phase II industrial
    17             park and incubator facility                 3,000,000
    18     (v)  Erie-Western Pennsylvania Port Authority
    19         (A)  Maritime Convention and Meeting
    20             Center                                     12,500,000
    21         (B)  Erie Rowing Club and Maritime Center,
    22             Inc., development of facility to
    23             support recreational and educational
    24             activities conducted along Erie's
    25             bayfront                                    8,000,000
    26         (C)  KEYSTONE OPPORTUNITY ZONE INDUSTRIAL                  <--
    27             PARK SUBDIVISION                            1,500,000
    28     (vi)  County Projects
    29         (A)  Erie Area Fund for the Arts, cultural
    30             district signage and electronic
    19990S0572B0686                 - 79 -

     1             information system                            500,000
     2         (B)  Restoration of the Watson-Curtze
     3             Mansion                                     1,500,000
     4         (C)  Phase II museum complex restoration                   <--
     5             and expansion at Discovery Square and
     6             continuing expansion and restoration of
     7             Discovery Square                           20,000,000
     8         (C)  HOUSING AND NEIGHBORHOOD DEVELOPMENT                  <--
     9             SERVICE - REMOVAL OF UNDERGROUND
    10             STORAGE TANKS, DEMOLITION OF STRUCTURE,
    11             DEVELOPMENT OF COMMUNITY SPACE AT
    12             CHESTNUT STREET PROJECT                     2,200,000
    13         (D)  Headwaters Conservation Park,
    14             construction of 10,000-square-foot
    15             multipurpose facility                       2,025,000
    16         (E)  International Institute of Erie,
    17             establishment of an Erie Community
    18             Cultural Center                             1,356,000
    19         (F)  Dr. Gertrude A. Barber Foundation,
    20             Inc. - expansion of facilities              2,750,000
    21         (G)  Edinboro YMCA, construction of pool
    22             and attendant facilities                    1,000,000
    23         (H)  Expansion of Erie County Children's
    24             Library                                       500,000
    25     (vii)  City of Erie
    26         (A)  Erie United Methodist Alliance -
    27         Project Hope for the Homeless                   1,558,000
    28         (B)  City Mission/New Life Center - Phase
    29             II improvements                             2,461,000
    30         (C)  Experience Children's Museum/Warbirds
    19990S0572B0686                 - 80 -

     1             of America Air Museum - develop display
     2             facility for combat aircraft                1,500,000
     3         (D)  Redevelopment Authority of the City of
     4             Erie, establishment of an Erie Business
     5             Development Resource Center                   750,000
     6         (E)  Erie Municipal Airport Authority -
     7             development of a multimodal freight
     8             facility                                    5,000,000
     9         (F)  Greater Erie Industrial Development
    10             Corporation - development of industrial
    11             parks within the City of Erie               1,650,000
    12         (G)  GREATER ERIE INDUSTRIAL DEVELOPMENT                   <--
    13             CORPORATION - ERIE KNOWLEDGE PARK PART
    14             II, INFRASTRUCTURE IMPROVEMENTS             3,250,000
    15         (G) (H)  Erie Zoo - renovation of                          <--
    16             Children's Zoo                              1,600,000
    17         (H) (I)  Erie Zoo - renovation of the front                <--
    18             gate and concession complex                   850,000
    19         (I) (J)  Erie Zoo - construction of south                  <--
    20             admission facilities                        1,050,000
    21     (viii)  Millcreek Township
    22         (A)  Asbury Woods Nature Center -
    23             development of Greenway Project             1,691,000
    24     (ix)  Erie City Water Authority
    25         (A)  Pump house rehabilitation                  3,500,000
    26  (23)  Fayette County
    27     (i)  Fayette County Keystone Opportunity Zone
    28         (A)  For industrial development projects        2,000,000
    29     (ii)  Touchtone Center for Crafts
    30         (A)  Renovation of facilities                     500,000  <--
    19990S0572B0686                 - 81 -

     1         (A)  RENOVATION OF FACILITIES                   1,000,000  <--
     2     (iii)  Fort Necessity Visitors Center
     3         (A)  Additional funds for the restoration
     4             and expansion of the visitor center         5,000,000
     5     (iv)  State Theatre Center for the Arts
     6         (A)  Additional funds for the restoration
     7             of the State Theatre in Uniontown           3,000,000
     8     (V)  RENOVATIONS TO FALLINGWATER HISTORIC HOME      6,500,000  <--
     9  (24)  Forest County
    10     (i)  Forest County Industrial Development
    11         Corporation
    12         (A)  Infrastructure improvements for the
    13             KOZ Industrial Park in Forest County        2,000,000
    14  (25)  Franklin County
    15     (i)  County Projects
    16         (A)  Agricultural and environmental center      1,002,000
    17         (B)  Fire training center                         633,000
    18     (ii)  Borough of Chambersburg
    19         (A)  Restoration of Capital Theatre             2,000,000
    20  (26)  Fulton County
    21     (i)  County Projects
    22         (A)  Fulton Medical Center, McConnellsburg
    23             Borough - construction of new medical
    24             center to serve Fulton County              20,000,000
    25         (B)  Fulton County Industrial Development
    26             Association - multitenant facility          2,000,000
    27         (C)  Community Auditorium and Performing
    28             Arts Center, Waterfall                      1,000,000
    29  (27)  Greene County
    30     (i)  County Projects
    19990S0572B0686                 - 82 -

     1         (A)  Exit 3 county site development - Phase
     2             I, development of sites for new
     3             industrial park at major interchange on
     4             I-79                                        4,540,000
     5         (B)  Exit 3 county site development - Phase
     6             II, development of sites for new
     7             industrial park at major interchange on
     8             I-79                                        1,500,000
     9         (C)  Kirby commercial site, development of
    10             new industrial site                           500,000
    11         (D)  Lantz Farm Industrial Site,
    12             development of an industrial site
    13             adjacent to the Greene County Airport
    14             Industrial Park at Exit 3 on I-79           5,000,000
    15         (E)  Nemacolin Industrial Park - Phase I,
    16             development of new industrial park on
    17             the former LTV mine area in Nemacolin      15,000,000
    18         (F)  Paisley Industrial Park - Phase I,
    19             development of a 75-acre industrial
    20             site                                        1,250,000
    21         (G)  CARMICHAELS-CUMBERLAND JOINT SEWER                    <--
    22             AUTHORITY, SEWER EXTENSION TO PAISLEY
    23             INDUSTRIAL PARK                             1,000,000
    24         (H)  LOWER TEN MILE, SEWER EXTENSION TO
    25             WILSON COMPANY INDUSTRIAL PARK              1,000,000
    26         (I)  PAISLEY INDUSTRIAL PARK, LAND
    27             ACQUISITION AND CONSTRUCTION OF
    28             SPECULATIVE BUILDING                          500,000
    29         (J)  MOUNT MORRIS INDUSTRIAL PARK,
    30             CONSTRUCTION OF SPECULATIVE BUILDING          500,000
    19990S0572B0686                 - 83 -

     1         (K)  FRANKLIN TOWNSHIP INDUSTRIAL PARK,
     2             IMPROVEMENTS                                5,700,000
     3         (L)  LAND BANK RESOURCES, LAND ACQUISITION
     4             FOR KEY DEVELOPMENT SITES                   2,000,000
     5         (M)  SOUTHWESTERN PENNSYLVANIA WATER
     6             AUTHORITY, WATER LINE EXTENSION TO
     7             GRAYSVILLE INDUSTRIAL PARK                  2,200,000
     8         (N)  CARMICHAELS BOROUGH, CONSTRUCTION OF
     9             FLENNIKEN PUBLIC LIBRARY                    2,000,000
    10  (28)  Huntingdon County
    11     (i)  County Projects
    12         (A)  Lake Raystown Amphitheater                 2,000,000
    13         (B)  East Broad Top Railroad Shop Museum,
    14             Rockhill Furnace                            8,200,000
    15  (29)  Indiana County
    16     (i)  County Projects
    17         (A)  Interchange center, development of a
    18             30,000-square-foot multitenant building
    19             located at the Indiana Corporate
    20             Campus                                        650,000
    21         (B)  Jimmy Stewart Museum, expansion            7,500,000
    22  (30)  Jefferson County
    23     (i)  Jefferson County Development Council, Inc.
    24         (A)  Jefferson County Powder Metal Tech
    25             Center                                      2,175,000
    26  (31)  Lackawanna County
    27     (i)  Borough of Jessup
    28         (A)  Acquisition, development and
    29             construction of a business park             1,750,000
    30         (B)  Moosic Mountain Business Park
    19990S0572B0686                 - 84 -

     1             infrastructure development                  1,750,000
     2     (II)  CITY OF SCRANTON                                         <--
     3         (A)  RENOVATION OF FORMER NORTH SCRANTON
     4             JR. HIGH SCHOOL FOR USE BY GOODWILL
     5             INDUSTRIES                                  4,873,000
     6     (III)  COUNTY PROJECTS
     7         (A)  ACQUISITION AND CONSTRUCTION OF
     8             NORTHEAST REGIONAL CANCER INSTITUTE
     9             HEADQUARTERS FACILITY                       3,600,000
    10         (B)  ADDITIONAL FUNDS FOR LACKAWANNA COUNTY
    11             STADIUM                                       800,000
    12  (32)  Lancaster County
    13     (i)  City of Lancaster
    14         (A)  Multipurpose stadium                      10,000,000
    15     (ii)  Ephrata Borough
    16         (A)  Acquisition, rehabilitation and
    17             renovation of the Mountain Springs
    18             Hotel including auxiliary buildings and
    19             facilities                                  5,000,000
    20  (33)  Lawrence County
    21     (i)  Neshannock Business Park
    22         (A)  Phase II - including land acquisition,
    23             infrastructure improvements and site
    24             preparation                                 2,250,000
    25     (ii)  Neshannock Municipal Building
    26         (A)  Renovation and expansion                   1,100,000
    27     (iii)  Westminster College Summer Music
    28         Institute
    29         (A)  Development of Western Pennsylvania
    30             Summer Musical Festival and Music
    19990S0572B0686                 - 85 -

     1             Outreach Program                            4,500,000
     2     (iv)  County Projects
     3         (A)  Riverview Commerce Park, Phase II,
     4             including land acquisition, site
     5             clearance and site preparation for
     6             redevelopment of a brownfield site          2,500,000
     7         (B)  Three Rivers Business Park                 1,000,000
     8     (v)  City of New Castle
     9         (A)  New Castle Tourist Destination
    10             Project                                    10,000,000
    11         (B)  New Castle Civic Center, development
    12             of a multipurpose civic and sports
    13             complex                                     1,500,000
    14  (34)  Lebanon County
    15     (i)  Annville Township
    16         (A)  Streetscape improvement project            2,500,000
    17  (35)  Lehigh County
    18     (i)  North Whitehall and Lowhill Townships
    19         (A)  Capital improvements to the Trexler-
    20             Lehigh County Game Preserve                20,000,000
    21     (ii)  City of Allentown
    22         (A)  Acquisition and demolition of adjacent
    23             structures and construction of an
    24             addition to the Allentown Art Museum        8,000,000
    25         (B)  Purchase and renovation of buildings
    26             at the Allentown State Hospital for
    27             Lehigh Valley Community Services for
    28             Children                                    2,000,000
    29         (C)  Construction of parking deck FOR THE                  <--
    30             TRANSPORTATION MUSEUM and multipurpose
    19990S0572B0686                 - 86 -

     1             facility FACILITIES for Lehigh Landing      5,000,000  <--
     2         (D)  Renovation and restoration of
     3             buildings and improvements to the
     4             streetscape in and around the 800 block
     5             of Hamilton Mall                           15,000,000
     6  (36)  Luzerne County
     7     (i)  City of Wilkes-Barre
     8         (A)  Downtown economic redevelopment           22,000,000
     9         (B)  Biscontini Distribution Center,
    10             relocation and rehabilitation of rail
    11             siding to Biscontini Distribution
    12             Center                                        866,000
    13         (C)  F. M. Kirby Center for the Performing
    14             Arts, renovate existing facility and
    15             upgrade technical equipment                 3,200,000
    16         (D)  ACQUISITION, RENOVATION,                              <--
    17             REHABILITATION AND RESTORATION OF LAND
    18             AND BUILDINGS FOR THE WEINBERG
    19             NORTHEAST PENNSYLVANIA REGIONAL FOOD
    20             BANK                                        1,000,000
    21     (II)  COUNTY PROJECTS
    22         (A)  LUZERNE COUNTY COMMUNITY COLLEGE,
    23             CONSTRUCTION OF REGIONAL ATHLETIC
    24             FACILITY                                   10,000,000
    25  (37)  Lycoming County
    26     (i)  County Projects
    27         (A)  Construction of new stadium and
    28             concourse area for Little League
    29             Baseball                                    6,000,000
    30         (B)  Higher Dimension Technology Park, land
    19990S0572B0686                 - 87 -

     1             acquisition                                 4,100,000
     2         (C)  Lycoming County industrial park, land
     3             acquisition                                 3,500,000
     4  (38)  McKean County
     5     (i)  City of Bradford - Office of Economic and
     6         Community Development
     7         (A)  Renovation, addition and improvements
     8             to the old City Hall building               2,600,000
     9         (B)  Upgrades to the Parkway Complex            1,100,000
    10     (ii)  McKean County Industrial Development
    11         Authority
    12         (A)  Construction of a communications, art
    13             and technology building in Bradford        14,500,000
    14     (iii)  McKean County Redevelopment and Housing
    15         Authority
    16         (A)  Hamlin Lake Dam repair - restoration
    17             project                                     1,000,000
    18  (39)  Mercer County
    19     (i)  City of Farrell
    20         (A)  Renovation of Shenango Valley Multi-
    21             Service Center                              4,500,000
    22         (B)  Demolition, revitalization and
    23             renovation of blighted and
    24             underutilized buildings and associated
    25             development                                 3,000,000
    26     (ii)  County Projects
    27         (A)  Shenango Valley industrial park -
    28             infrastructure improvements                 1,000,000
    29         (B)  Air and Space Institute/Entertainment
    30             Destination Center                         25,000,000
    19990S0572B0686                 - 88 -

     1         (C)  Greenville Regional Outdoor Sports
     2             Complex at Riverside Park including
     3             swimming pool renovations, river
     4             walk/trail improvements and recreation
     5             center improvements                         5,376,000
     6     (iii)  City of Sharon
     7         (A)  Renovations to the Columbia Theatre        8,000,000
     8         (B)  Rehabilitation of the Sharon Stadium       3,000,000
     9         (C)  Rehabilitation of the Westinghouse
    10             plant                                      20,000,000
    11  (40)  Mifflin County
    12     (i)  County Projects
    13         (A)  Improvements to Old Mifflin County
    14             Courthouse                                    785,000
    15     (ii)  Mifflin County Industrial Development
    16         Corporation
    17         (A)  Development of the Mifflin County
    18             Industrial Plaza                            2,000,000
    19  (41)  Monroe County
    20     (i)  Pocono Mountains Industries
    21         (A)  Expansion of business park                19,575,000
    22         (B)  EXPANSION OF POCONO MOUNTAINS BUSINESS                <--
    23             PARK, PHASE II                              1,545,000
    24     (ii)  Pocono Medical Center
    25         (A)  Construction of multilevel parking
    26             garage/heliport                             6,000,000
    27         (B)  EXPANSION AND RENOVATION OF COMMUNITY                 <--
    28             EMERGENCY SERVICES                          8,000,000
    29     (III)  BOROUGH OF STROUDSBURG
    30         (A)  HISTORIC DOWNTOWN MAIN STREET LIGHTING
    19990S0572B0686                 - 89 -

     1             PROGRAM                                       650,000
     2     (IV)  SMITHFIELD TOWNSHIP
     3         (A)  EXPANSION OF WASTE WATER TREATMENT
     4             SYSTEM AND MUNICIPAL WATER                  1,500,000
     5  (42)  Montgomery County
     6     (i)  Salvation Army Community Center
     7         (A)  Land acquisition and construction          1,000,000
     8     (ii)  Norristown Borough
     9         (A)  Construction of hotel at Hancock
    10             Square                                      3,000,000
    11         (B)  Construction of parking garage             1,250,000
    12         (C)  CONSTRUCTION OF EXHIBITS AND EDUCATION                <--
    13             AND HOSPITAL FACILITY FOR THE ELMWOOD
    14             PARK ZOO                                    1,100,000
    15     (iii)  Norristown and Pottstown Boroughs
    16         (A)  Keystone Opportunity Zone
    17             infrastructure improvements                 5,800,000
    18     (iv)  Borough of Pottstown, Lower Pottsgrove
    19         Township, West Pottsgrove Township
    20         (A)  John Potts County Park, acquisition
    21             and redevelopment of land to link five
    22             community parks                             4,000,000
    23     (iv)  Borough of Conshohocken
    24         (A)  Development of Fayette Plaza               2,000,000
    25         (B)  Marriot Residence Inn at Tower Bridge      4,300,000
    26         (C)  Renovation and rehabilitation of
    27             Fellowship House                              500,000
    28     (v)  Lower Merion Township
    29         (A)  Community park development                 2,000,000
    30     (vi)  Horsham Township
    19990S0572B0686                 - 90 -

     1         (A)  Montgomery County Higher Education and
     2             Health Authority - acquisition of land,
     3             site improvements, design and
     4             construction of a comprehensive
     5             geriatric care center and attendant
     6             research facility                          12,000,000
     7     (vii)  Peter Wentz Farmstead
     8         (A)  Construction of Education and Visitor
     9             Center                                      1,000,000
    10     (viii)  Upper Merion Township and Valley Forge
    11         Historical Society
    12         (A)  Construction of the National Museum of
    13             the American Revolution                    10,000,000
    14     (ix)  Pennsylvania College of Optometry
    15         (A)  Site acquisition, development and
    16             construction costs of a student
    17             community center                            3,000,000
    18     (X)  URSINUS COLLEGE                                           <--
    19         (A)  EXPANSION OF BERMAN MUSEUM AND WISMER
    20             CENTER                                      1,000,000
    21     (XI)  ABINGTON ART CENTER
    22         (A)  CAPITAL IMPROVEMENTS TO ALVERTHORPE
    23             MANOR                                          50,000
    24  (43)  Northampton County
    25     (i)  City of Bethlehem
    26         (A)  Development of the Preview Center
    27             building - Phase I for the national
    28             Museum of Industrial History in
    29             affiliation with the Smithsonian
    30             Institution                                 4,125,000
    19990S0572B0686                 - 91 -

     1         (B)  Development of the permanent building
     2             and exhibition center - Phase II for
     3             the national Museum of Industrial
     4             History in affiliation with the
     5             Smithsonian Institution                    25,875,000
     6         (C)  Bethlehem Musikfest Association
     7             Performing Arts Center, construction of
     8             a 12,000-seat performing arts
     9             amphitheater on a brownfield site
    10             located in south Bethlehem                 10,000,000
    11         (D)  Bethlehem commerce center                 10,000,000
    12         (E)  CONSTRUCTION OF PARKING DECK AT BROAD                 <--
    13             STREET AND MAIN STREET                      8,000,000
    14     (ii)  County Project
    15         (A)  Construction of Technology Learning
    16             Center at Hugh Moore Historical Park        1,000,000
    17         (B)  Construction of Northampton County
    18             Drug and Alcohol Annex                      4,000,000
    19         (C)  Development in Lehigh Valley
    20             Industrial Park                             8,460,000
    21         (D)  PORTLAND SLATE BELT SEWER UPGRADES         1,500,000  <--
    22     (iii)  City of Easton
    23         (A)  Construction of Easton Community
    24             Center                                      3,500,000
    25         (B)  Construction of Easton Intermodal
    26             Visitors Center                             5,000,000
    27         (C)  Renovation of Lafayette College
    28             Downtown Arts Center                        2,600,000
    29         (D)  Weller Center for Health Education         3,700,000
    30         (E)  Improvements to the Easton State
    19990S0572B0686                 - 92 -

     1             Theater Center for the Arts                 3,400,000
     2         (F)  The Discovery Center                       4,000,000
     3         (G)  Acquisition and renovation of the
     4             Lehigh Valley Charter High School for
     5             the Performing Arts                         3,241,000
     6  (44)  Perry County
     7     (i)  County Projects
     8         (A)  Purchase and development of Business
     9             Campus I industrial park                    2,000,000
    10         (B)  Purchase and development of Business
    11             Campus II industrial park                   4,000,000
    12     (ii)  Duncannon Borough
    13         (A)  Construction of building for fire
    14             department                                  1,000,000
    15  (45)  Philadelphia County
    16     (i)  City of Philadelphia
    17         (A)  Please Touch Museum                       10,000,000
    18         (B)  For the restoration and upgrade of
    19             critical instructional facilities on
    20             the campus of Drexel University
    21             including Commonwealth Hall                10,000,000
    22         (C)  For facility expansion for additional
    23             exhibition, classroom, collection,
    24             storage and other improvements and the
    25             National Museum of American Jewish
    26             History                                      3,500,00  <--
    27             HISTORY                                     3,500,000  <--
    28         (D)  Philadelphia Zoo - construction of
    29             bird garden                                11,000,000
    30         (E)  Philadelphia Zoo - relocation of
    19990S0572B0686                 - 93 -

     1             Children's Zoo and reconstruction of
     2             lake promenade                              7,500,000
     3         (F)  Philadelphia Zoo - construction of
     4             administrators/service complex              6,500,000
     5         (G)  Atwater Kent Museum, renovation and
     6             expansion                                   2,000,000
     7         (H)  The WHYY Technical Operations Center,
     8             renovation, restructuring and
     9             equipping                                   5,300,000
    10         (I)  Settlement Music School, for facility
    11             construction, renovation and
    12             acquisition                                 1,250,000
    13         (J)  West Allegheny Community Center
    14             Complex, land development and
    15             construction of a full service health,
    16             recreational and community service
    17             campus                                      1,300,000  <--
    18             CAMPUS                                      4,200,000  <--
    19         (K)  Pennsylvania Academy of Fine Arts,
    20             expansion and renovation                   15,000,000
    21         (L)  Cobbs Creek Environmental Education
    22             Center, construction of the
    23             Environmental Center                          500,000
    24         (M)  Royal Theater, construction and
    25             rehabilitation of the historic African-
    26             American Theater                              500,000
    27         (N)  Myers recreation center, improvements        500,000
    28         (O)  University Science Center,
    29             Pennsylvania Port of Technology             5,000,000
    30         (P)  CORA Services, construction of a youth
    19990S0572B0686                 - 94 -

     1             services and administrative facility        4,000,000
     2         (Q)  Independence Seaport Museum,
     3             renovation and expansion                    1,000,000
     4         (R)  The Curtis Institute of Music,
     5             renovation of Curtis Hall                   1,000,000
     6         (S)  Dorothy Emanuel Recreation Center,
     7             expansion                                   2,000,000  <--
     8             EXPANSION                                   4,000,000  <--
     9         (T)  Development of the former Temple
    10             Stadium site on Cheltenham Avenue           1,000,000
    11         (U)  Expansion of the Center of the Park
    12             Campus in Germantown including
    13             renovation of the YMCA building on
    14             Germantown Avenue to create assisted
    15             living services                             1,000,000
    16         (V)  Reconstruction of the Bushfire
    17             Theatre                                     2,000,000
    18         (W)  Land acquisition and development for
    19             the Brandywine Workshop Center for the
    20             Visual Arts                                   500,000
    21         (X)  The Philadelphia Museum of Art
    22             (I)  Acquisition, renovation and
    23                 development of new building
    24                 facility                               30,000,000
    25             (II)  Renovations of museum galleries      15,000,000
    26             (III)  Improvement and expansion of
    27                 educational facilities                  7,000,000
    28             (IV)  Expansion and improvement of
    29                 library                                 3,000,000
    30             (V)  Infrastructure improvements in
    19990S0572B0686                 - 95 -

     1                 tunnel and loft                        20,000,000
     2         (Y)  WISSINOMING RECREATION CENTER                         <--
     3             CONSTRUCTION                                1,000,000
     4         (Z)  CITY WIDE IMPROVEMENT AND PLANNING
     5             AGENCY, RECONSTRUCTION OF BUILDINGS AND
     6             PARKING FACILITIES FOR YOUTH MINI MALL      1,000,000
     7         (AA)  PEOPLE'S EMERGENCY CENTER-FAMILIES
     8             FIRST CONSTRUCTION PROJECT                  1,900,000
     9         (BB)  WOMEN'S HEALTH CENTER CONSTRUCTION        4,000,000
    10         (CC)  WYNNFIELD RECREATION COMPLEX
    11             CONSTRUCTION                                  800,000
    12         (DD)  FIRST TEE CONSTRUCTION PROJECT            1,000,000
    13         (EE)  PAINTED BRIDE ART CENTER RENOVATIONS      1,000,000
    14         (FF)  WOODMERE ART MUSEUM RENOVATIONS           1,000,000
    15         (GG)  ROSENBACH MUSEUM AND LIBRARY
    16             RENOVATIONS                                 1,000,000
    17         (HH)  ADDITIONAL FUNDS FOR MULTIPURPOSE
    18             HUNGER RELIEF CENTER IN PHILADELPHIA'S
    19             FOOD DISTRIBUTION CENTER                      393,000
    20         (II)  PHILADELPHIA COUNTY MINORITY ARTS
    21             RESOURCE COUNCIL, RENOVATION OF
    22             HISTORIC BUILDING LOCATED ON AVENUE OF
    23             THE ARTS                                      900,000
    24  (46)  Pike County
    25     (i)  County Projects
    26         (A)  Keystone Center of Music and the Arts     17,500,000
    27  (47)  Potter County
    28     (i)  Potter County Housing and Redevelopment
    29         Authorities
    30         (A)  Infrastructure improvements                7,400,000
    19990S0572B0686                 - 96 -

     1  (48)  Somerset County
     2     (i)  Elk Lick Township
     3         (A)  Elk Lick Township sewer extension
     4             project to provide sewage service to
     5             the industrial park                           650,000
     6     (ii)  Somerset Township Municipal Authority
     7         (A)  Allegheny College sewer extension
     8             project to extend sewage service to the
     9             college and commercial properties along
    10             the route                                     863,000
    11     (iii)  Borough of Windber
    12         (A)  Sewer extension project and upgrade
    13             for industrial park                         1,000,000
    14  (48.1)  UNION COUNTY                                              <--
    15     (I)  COUNTY PROJECT
    16         (A)  DEVELOPMENT OF GREAT STREAMS COMMONS
    17             BUSINESS PARK                               3,000,000
    18  (49)  Venango County
    19     (i)  Venango Economic Development Corporation
    20         (A)  Expansion of industrial space at the
    21             Oil City Industrial Park                    2,000,000
    22     (ii)  County Projects
    23         (A)  Rehabilitation and improvements to the
    24             Weaver Garage for the purposes of a
    25             visitors center for the Oil Heritage
    26             Region, Inc.                                2,300,000
    27         (B)  Oil City Industrial Park, construction
    28             of additional industrial space              1,000,000
    29         (C)  Barkeyville Industrial Park, land
    30             acquisition                                   900,000
    19990S0572B0686                 - 97 -

     1         (D)  Renovation of the Venango County
     2             Courthouse                                  1,500,000
     3         (E)  Renovation of Polk Center for reuse        2,500,000
     4     (iii)  Parks Unlimited
     5         (A)  Construction of lodging facilities at
     6             Two Mile Run Park                           5,000,000
     7     (iv)  Northwest Pennsylvania Regional Planning
     8         Development Commission
     9         (A)  Renovation, construction and equipment
    10             for the Clarion/Forest County Wood
    11             Institute                                   3,000,000
    12     (v)  French Creek Council, BSA
    13         (A)  Custaloga Town Scout Reservation
    14             improvements                                1,500,000
    15     (vi)  Northwest Regional Medical Facility
    16         (A)  Construct new hospital                    20,000,000
    17  (50)  Warren County
    18     (i)  Northern Alleghenies Vacation Region
    19         (A)  Land acquisition, infrastructure and
    20             construction of the Warren County
    21             Visitors Center                             3,000,000
    22     (ii)  County Projects
    23         (A)  Infrastructure and construction of
    24             waterfront park                             2,000,000
    25         (B)  Development of the Farm Colony mini-
    26             industrial park in Conewango Township       2,000,000
    27         (C)  Construction of a machine technology
    28             center for the Warren County Career
    29             Center                                      1,500,000  <--
    30             CENTER                                      2,000,000  <--
    19990S0572B0686                 - 98 -

     1     (iii)  City of Warren
     2         (A)  Site preparation and construction of
     3             the Warren City Industrial Park             1,000,000
     4  (51)  Washington County
     5     (i)  Peters Township
     6         (A)  Renovation of community center and
     7             police station                                700,000
     8     (ii)  County Projects
     9         (A)  I-79 Meadowlands Industrial Park,
    10             expansion and development                   1,250,000
    11         (B)  WESTERN CENTER REDEVELOPMENT,                         <--
    12             INFRASTRUCTURE TO INCLUDE SEWER AND
    13             WATERLINES FOR INDUSTRIAL PARK              6,000,000
    14         (C)  ROUTE 22 INDUSTRIAL PARK WATERLINES        3,000,000
    15         (D)  TRI-COUNTY PATRIOTS FOR INDEPENDENT
    16             LIVING, PURCHASE AND RENOVATION OF
    17             PROPERTY FOR EMPLOYMENT AND TRAINING OF
    18             PERSONS WITH DISABILITIES                     500,000
    19     (III)  FALLOWFIELD TOWNSHIP
    20         (A)  INDUSTRIAL PARK SEWER LINES                3,000,000
    21     (IV)  UNION TOWNSHIP
    22         (A)  INDUSTRIAL PARK SEWER LINES                3,000,000
    23     (V)  CARROLL TOWNSHIP
    24         (A)  INDUSTRIAL PARK SEWER LINES                3,000,000
    25  (51.1)  WAYNE COUNTY AND PIKE COUNTY
    26     (I)  LAKE WALLENPAUPACK ENVIRONMENTAL EDUCATION
    27         CENTER
    28         (A)  CONSTRUCTION OF AN ENVIRONMENTAL
    29             EDUCATION CENTER AND LABORATORY
    30             FACILITY FOR WATER QUALITY ANALYSIS AND
    19990S0572B0686                 - 99 -

     1             RESEARCH                                    1,000,000
     2  (52)  Westmoreland County
     3     (i)  County Projects
     4         (A)  Jeannette industrial redevelopment
     5             project, Phase II                           2,000,000
     6         (B)  Delmont - Murrysville Park,
     7             development of 300 acres industrial
     8             park within five miles of Delmont           3,000,000
     9         (C)  I-70 industrial park, Phase II,
    10             development of remaining 448 acres for
    11             distribution and warehousing markets        1,500,000
    12         (D)  Bushy Run Center, development of 147-
    13             acre industrial park                        1,750,000
    14         (E)  Westmoreland Distribution Center,
    15             Phase II                                    2,800,000
    16         (F)  Westmoreland County Airpark, Phase II,
    17             development of 200 acres of property
    18             abutting County Airport to accommodate
    19             air cargo and aviation-related
    20             companies                                   2,500,000
    21         (G)  Westmoreland intermodal facility,
    22             Phase I, development of former
    23             Volkswagon rail yard into intermodal
    24             track-rail facility complemented by
    25             Westmoreland Distribution Park              3,750,000
    26         (H)  Build-out, Troutman Building, historic
    27             renovation of existing building             2,000,000
    28         (I)  Destination, Westmoreland County
    29             Community College Baseball Stadium,
    30             renovation of current baseball field        1,500,000
    19990S0572B0686                 - 100 -

     1         (J)  Westmoreland Museum of American Art,
     2             construction of new amenities for
     3             visitors to the museum, as well as
     4             upgrade reinstallation of the permanent
     5             collection                                  1,000,000
     6         (K)  WEST OVERTON MUSEUM, LAND ACQUISITION                 <--
     7             OF TWO LOTS IN THE ORIGINAL VILLAGE AND
     8             RESTORATION OF HOUSE                        2,000,000
     9         (L)  CONSTRUCTION OF WESTMORELAND EMERGENCY
    10             SERVICES TRAINING CENTER                    1,500,000
    11  (53)  York County
    12     (i)  City of York
    13         (A)  Multipurpose stadium                      12,000,000
    14         (B)  Downtown revitalization                    1,000,000
    15         (C)  North George Street revitalization         1,000,000
    16         (D)  Strand-Capitol Performing Arts Center      4,000,000
    17     (ii)  County Projects
    18         (A)  York County Expo Center                    5,000,000
    19         (B)  York County Library System, library
    20             improvements including renovation,
    21             expansion or construction of facilities
    22             at Hanover, Southern York, Kaltreider-
    23             Befer, Martin and Red Lion Libraries        2,250,000
    24     (iii)  York County Economic Development
    25         Corporation/York County Training
    26         Partnership
    27         (A)  Acquisition and renovation of existing
    28             facility for work force development
    29             initiatives                                 1,000,000
    30  Section 7.  Itemization of flood control projects.
    19990S0572B0686                 - 101 -

     1     Additional capital projects in the category of flood control
     2  projects to be constructed by the Department of Environmental
     3  Protection, its successors or assigns, and to be financed by the
     4  incurring of debt are hereby itemized, together with their
     5  respective estimated costs, as follows:
     6                                                           Total
     7             Project                                    Allocation
     8  (1)  Department of Environmental Protection          $44,458,000
     9     (i)  Allegheny County
    10         (A)  Keystone Commons Intermodal Site,
    11             flood wall                                  1,000,000
    12         (B)  County Sanitary Authority
    13             (I)  Three Rivers Wet Weather
    14                 Demonstration Project                  26,300,000
    15             (II)  Nine Mile Run Habitat Restoration
    16                 Project                                 2,700,000
    17         (C)  City of Pittsburgh, additional funds
    18             for Lower Saw Mill Run Flood Control
    19             Project                                       578,000
    20             (Base Project Allocation - $578,000)
    21     (ii)  Carbon County
    22         (A)  Borough of Palmerton, additional funds
    23             for Palmerton Flood Control Project           110,000
    24             (Base Project Allocation - $110,000)
    25     (iii)  Fayette County
    26         (A)  Port Merion Borough, construction of
    27             streambank protection                         350,000
    28             (Base Project Allocation - $350,000)
    29     (iv)  Lackawanna County
    30         (A)  City of Scranton, East Mountain Storm
    19990S0572B0686                 - 102 -

     1             Water Management and Flood Control
     2             Project                                     7,200,000
     3         (B)  City of Scranton, additional funds for
     4             Scranton Flood Control Project                400,000
     5             (Base Project Allocation - $400,000)
     6         (C)  Borough of Olyphant, additional funds
     7             for the Olyphant Flood Control Project        400,000
     8             (Base Project Allocation - $400,000)
     9     (v)  Lycoming County
    10         (A)  Montoursville Borough, design and
    11             construction of a flood protection dike
    12             system along Loyalsock Creek                2,500,000
    13     (vi)  Northampton County
    14         (A)  Lehigh Valley Flood Commission flood
    15             mitigation                                  2,920,000
    16  Section 8.  Itemization of Keystone Recreation, Park and
    17                 Conservation Projects.
    18     Projects in the category of Keystone Recreation, Park and
    19  Conservation projects to be constructed by the Department of
    20  Conservation and Natural Resources, its successors or assigns,
    21  and to be financed by the incurring of debt and/or current
    22  revenues, are hereby itemized, together with their respective
    23  estimated costs, as follows:
    24                                                           Total
    25                                                          Project
    26             Project                                    Allocation
    27  (a)  State or local parks or recreation areas
    28  (1)  Allegheny County
    29     (i)  Yough River Trail north
    30         (A)  Expansion of the trail along the lower
    19990S0572B0686                 - 103 -

     1             Youghiogheny River                          1,500,000
     2         (B)  WESTERN PENNSYLVANIA MAINLINE TRAIL                   <--
     3             NETWORK, ACQUISITION AND CONSTRUCTION
     4             BETWEEN PITTSBURGH AND HARRISBURG           7,000,000
     5  (2)  Armstrong County
     6     (i)  Armstrong Trail
     7         (A)  Fifty-two miles of new trails as part
     8             of Rails to Trails tourism project          1,750,000
     9  (3)  Beaver County
    10     (i)  Raccoon Creek State Park
    11         (A)  Seal coat roads                              150,000
    12         (B)  Sewage and water treatment plant             490,000
    13  (4)  Bedford County
    14     (i)  Shawnee State Park
    15         (A)  Rehabilitation of sewage infiltration
    16             lines, Phase II                               227,000
    17         (B)  Replace lift stations 2, 3 and 5             300,000
    18         (C)  Rehabilitation of water plant roof and
    19             filters                                       110,000
    20         (D)  Rehabilitation of sewage treatment
    21             plant                                         450,000
    22         (E)  Rehabilitation of sewage collection
    23             system                                        500,000
    24  (5)  Berks County
    25     (i)  French Creek State Park
    26         (A)  Rehabilitation of Camp No.2, Phase II        150,000
    27         (B)  Group Camp No.1, Phase II                    100,000
    28         (C)  Main park road access                        100,000
    29         (D)  Lift station/pipes, pool backwash            200,000
    30         (E)  Rehabilitation of Scotts Run restroom        200,000
    19990S0572B0686                 - 104 -

     1  (6)  Bucks County
     2     (i)  Neshaminy State Park
     3         (A)  Desilt Marina Basin - dredging               250,000
     4     (ii)  Nockamixon State Park
     5         (A)  Pool rehabilitation                          500,000
     6  (7)  Butler County
     7     (i)  Moraine State Park
     8         (A)  Rehabilitation of South Shore Road,
     9             Phase I                                       500,000
    10         (B)  Rehabilitation of roads, Phase II            727,000
    11         (C)  Rehabilitation of roads, Phase III           833,000
    12         (D)  Rehabilitation of  W.T. 1, 2 and 10          280,000
    13         (E)  Marina sheetpiling rehabilitation            400,000
    14         (F)  Rte. 528 Launch Restroom
    15             Rehabilitation                                100,000
    16  (8)  Cambria County
    17     (i)  Prince Gallitzin State Park
    18         (A)  New R.R. pontoon mooring area                150,000
    19         (B)  Rehabilitation of sewage collection
    20             system, Phase I                               500,000
    21         (C)  Rehabilitation of sewage collection
    22             system, Phase II                              500,000
    23         (D)  Replace restrooms Beaver Valley              200,000
    24  (9)  Cameron County
    25     (i)  Sinnemahoning State Park
    26         (A)  Trash boom                                   100,000
    27     (ii)  Forest District No.13
    28         (A)  Forest maintenance building                  500,000
    29  (10)  Carbon County
    30     (i)  Hickory Run State Park
    19990S0572B0686                 - 105 -

     1         (A)  Latrine Rehabilitation                       100,000
     2         (B)  Resurface road - Boulder Field               117,000
     3  (11)  Centre County
     4     (i)  Bald Eagle State Park
     5         (A)  Replace Park Office                          490,000
     6         (B)  Replace Park Office/Visitor's Center         490,000
     7     (ii)  Black Moshannon State Park
     8         (A)  Modernize water and sewage; build
     9             C.S.                                          200,000
    10     (iii)  Poe Valley State Park
    11         (A)  Renovate campground washhouse                250,000
    12  (12)  Chester County
    13     (i)  Marsh Creek State Park
    14         (A)  Swimming pool rehabilitation filter
    15             building                                      200,000
    16  (13)  Clarion County
    17     (i)  Cook Forest State Park
    18         (A)  Rehabilitation of pool deck and
    19             fencing                                       234,000
    20         (B)  Replace two comfort stations and
    21             washhouses                                    495,000
    22         (C)  Rehabilitation of Park Office                225,000
    23  (14)  Clearfield County
    24     (i)  Parker Dam State Park
    25         (A)  Campground and Cabin Road repavement         210,000
    26  (15)  Clinton County
    27     (i)  Hyner Run State Park
    28         (A)  Resurface Park Road                          200,000
    29     (ii)  Kettle Creek State Park
    30         (A)  Renovate bathhouse                           150,000
    19990S0572B0686                 - 106 -

     1         (B)  Renovate campground washhouse                250,000
     2  (16)  Crawford County
     3     (i)  Pymatuning State Park
     4         (A)  Linesville Spillway                          800,000
     5         (B)  Rehabilitation of dam spillway             1,500,000
     6         (C)  Convert vault latrine to flush               352,000
     7  (17)  Cumberland County
     8     (i)  Kings Gap State Park
     9         (A)  Mansion renovations, Phase I                 425,000
    10         (B)  Kings Gap Mansion renovations, Phase
    11             II                                            425,000
    12     (ii)  Pine Grove Furnace State Park
    13         (A)  Bathhouse/Laurel Railroad/
    14             guardshed/parking                             550,000
    15     (III)  SHIPPENSBURG TOWNSHIP                                   <--
    16         (A)  COMMUNITY PARK DEVELOPMENT, INCLUDING
    17             THE PURCHASE AND ACQUISITION OF A 28-
    18             ACRE PARCEL OF LAND                           130,000
    19  (18)  Delaware County
    20     (i)  Ridley Creek State Park
    21         (A)  Reroof office                                250,000
    22         (B)  Rehabilitation of mansion plumbing/
    23             HVAC                                          350,000
    24  (19)  Elk County
    25     (i)  Bendigo State Park
    26         (A)  Rehabilitation of bathhouse/restroom         300,000
    27  (20)  Erie County
    28     (i)  Presque Isle State Park
    29         (A)  Office rehabilitation, Phase II              490,000
    30  (21)  Fayette County
    19990S0572B0686                 - 107 -

     1     (i)  Ohiopyle State Park
     2         (A)  Ferncliff High Bridge                        224,000
     3         (B)  Rehabilitation of boaters' change
     4             house                                         350,000
     5  (22)  Franklin County
     6     (i)  Caledonia State Park
     7         (A)  ADA replace restrooms (2), Lot 2             120,000
     8     (ii)  Forest District No.1
     9         (A)  Equipment storage building                   150,000
    10  (23)  Fulton County
    11     (i)  Cowans Gap State Park
    12         (A)  Repair sewage treatment plant                325,000
    13  (24)  Greene County
    14     (i)  Ryerson Station State Park
    15         (A)  Pool rehabilitation, Phase II                300,000
    16     (ii)  Rails to Trails
    17         (A)  Development of a trail along the
    18             Monongahela River bordering Fayette and
    19             Washington Counties                           750,000
    20     (III)  MONONGAHELA RIVERFRONT DEVELOPMENT             600,000  <--
    21     (IV)  GREENE COUNTY CENTRAL POOL                      300,000
    22     (V)  FRANKLIN TOWNSHIP, CRAWFORD FIELD PARK AND
    23         ROUTE 188 SITE PREPARATION                        325,000
    24     (VI)  RICHHILL TOWNSHIP COMMUNITY PARK
    25         CONSTRUCTION AND IMPROVEMENTS                     127,000
    26  (25)  Huntingdon County
    27     (i)  Greenwood Furnace State Park
    28         (A)  Sewage treatment plant repairs               160,000
    29     (ii)  Forest District No.5
    30         (A)  Paving Laurel Run Road                       750,000
    19990S0572B0686                 - 108 -

     1         (B)  Footbridge over Little Juniata for
     2             Mid-State Trail                               250,000
     3         (C)  Resurface Stone Creek Road                   750,000
     4  (26)  Lackawanna County
     5     (i)  Lackawanna State Park
     6         (A)  Dam repairs                                  300,000
     7     (II)  ADDITIONAL FUNDS FOR LACKAWANNA COUNTY                   <--
     8         STADIUM                                           800,000
     9  (27)  Lebanon County
    10     (i)  Memorial Lake State Park
    11         (A)  Repairs or renovation of dam
    12             structure                                     325,000
    13  (28)  Luzerne County
    14     (i)  Frances Slocum State Park
    15         (A)  STP rehabilitation & line
    16             rehabilitation                                300,000
    17         (B)  Replace office - visitor center              450,000
    18         (C)  Replace office - visitor center, Phase
    19             II                                            450,000
    20         (D)  Rehabilitate and pave park roads and
    21             parking lots                                  430,000
    22         (E)  Resurface road and boat launches             200,000
    23  (29)  Lycoming County
    24     (i)  Little Pine State Park
    25         (A)  Rehabilitate and modernize sewage and
    26             water                                         300,000
    27     (ii)  Susquehanna State Park
    28         (A)  Construct restrooms                          125,000
    29     (iii)  Forest District No.12
    30         (A)  Construct forest maintenance
    19990S0572B0686                 - 109 -

     1             headquarters                                  500,000
     2  (30)  Mercer County
     3     (i)  M.K. Goddard State Park
     4         (A)  Marina rehabilitation                        400,000
     5         (B)  Marina rehabilitation                        250,000
     6         (C)  Rehabilitation of lift stations              250,000
     7  (31)  Montgomery County
     8     (i)  Evansburg State Park
     9         (A)  Golf course dam repairs                      122,000
    10     (ii)  Fort Washington State Park
    11         (A)  Replace pit latrines, Phase I, sewer
    12             lines                                         200,000
    13         (B)  Replace pit latrines, Phase II               300,000
    14  (32)  Northampton County
    15     (i)  Jacobsburg State Park
    16         (A)  Maintenance building rehabilitation          150,000
    17     (ii)  Palmer Township
    18         (A)  Flood control, storm water management
    19             and recreation center improvements          7,980,000
    20  (33)  Perry County
    21     (i)  Little Buffalo State Park
    22         (A)  Rehabilitation of swimming pool            1,300,000
    23         (B)  Pool complex                                 600,000
    24     (ii)  Forest District No.3
    25         (A)  Addition to district office                  600,000
    26     (III)  DUNCANNON BOROUGH                                       <--
    27         (A)  REHABILITATION OF COOPER FIELD               100,000
    28  (34)  Pike County
    29     (i)  Promised Land State Park
    30         (A)  Rehabilitate Pickerel Point Camp             350,000
    19990S0572B0686                 - 110 -

     1         (B)  Rehabilitate sewage treatment plant          620,000
     2  (35)  Potter County
     3     (i)  Lyman Run State Park
     4         (A)  Replace restrooms day use/pave road          250,000
     5         (B)  Replace low campground washhouse             150,000
     6         (C)  Campground washhouse/renovate sites -
     7             Daggot                                        225,000
     8     (ii)  Ole Bull State Park
     9         (A)  Campground washhouse and sewerline           225,000
    10         (B)  Repairs to campground road and
    11             washhouse                                     250,000
    12     (iii)  Sizerville State Park
    13         (A)  Construct park office/visitor center         300,000
    14     (iv)  Forest District No.15
    15         (A)  Resource management office                   500,000
    16  (36)  Schuylkill County
    17     (i)  Tuscarora State Park
    18         (A)  Replace boat launch comfort station          100,000
    19  (37)  Somerset County
    20     (i)  Laurel Hill State Park
    21         (A)  STP - replace air system, desilt
    22             lagoons                                       300,000
    23         (B)  Main park road overlay                       260,000
    24         (C)  Rehabilitate baths T & T area                245,000
    25  (38)  Sullivan County
    26     (i)  Worlds End State Park
    27         (A)  Water/sewer system replacement               406,000
    28         (B)  Park office, Phase I                         300,000
    29         (C)  Park office, Phase II                        300,000
    30     (ii)  Forest District No.20
    19990S0572B0686                 - 111 -

     1         (A)  Mill Creek Road and West Branch Mill
     2             Creek channel improvement                     654,000
     3  (39)  Tioga County
     4     (i)  Hills Creek State Park
     5         (A)  Replace washhouse building No.109-13         200,000
     6     (ii)  Leonard Harrison State Park
     7         (A)  Replace pit latrines, Phase I                400,000
     8         (B)  Construct restrooms/washhouse                493,000
     9     (iii)  Forest District No.12 and No.16
    10         (A)  Pine Creek rail/trail improvements         2,500,000
    11         (B)  Development of Pine Creek rail/trail       1,000,000
    12     (iv)  Forest District No.16
    13         (A)  Addition to Building 16-0-1                  300,000
    14  (40)  Union County
    15     (i)  R.B. Winter State Park
    16         (A)  Rehabilitate day use restrooms and
    17             concession                                    300,000
    18         (B)  Campground washhouse/restroom, Phase
    19             II                                            200,000
    20  (41)  Warren County
    21     (i)  Chapman State Park
    22         (A)  Renovate bathhouse and concession            300,000
    23  (42)  Westmoreland County
    24     (i)  Forest District No.4
    25         (A)  Equipment storage building                   150,000
    26         (B)  Addition to building 4-G200GSA               200,000
    27  (43)  York County
    28     (i)  Codorus State Park
    29         (A)  Remove and construct (2) ADA pit
    30             latrines                                      300,000
    19990S0572B0686                 - 112 -

     1     (ii)  Gifford Pinchot State Park
     2         (A)  Day use rehabilitation, Quaker Race,
     3             Phase I                                       650,000
     4         (B)  Day use rehabilitation, Quaker Race,
     5             Phase II                                      275,000
     6         (C)  ADA repair campground restrooms, Phase
     7             II                                            180,000
     8         (D)  Rehabilitate day use area                    850,000
     9  (b)  State Park Bridges
    10     (1)  Beaver County
    11         (A)  Replacement of Bridge No.13-1200 over
    12             Valley Road End in Raccoon Creek State
    13             Park                                          100,000
    14         (B)  Replacement of Bridge No.13-1201 over
    15             Valley Road entrance in Raccoon Creek
    16             State Park                                    250,000
    17         (C)  Replacement of Bridge No.13-1203 over
    18             Mineral Springs Road in Raccoon Creek
    19             State Park                                    122,000
    20         (D)  Replacement of Bridge No.13-1204 over
    21             service yard in Raccoon Creek State
    22             Park                                          109,000
    23         (E)  Replacement of Bridge No.13-1206 over
    24             Main Road West of office in Raccoon
    25             Creek State Park                              370,000
    26         (F)  Replacement of Bridge No.13-1209 over
    27             main road near W.T. Plant in Raccoon
    28             Creek State Park                              480,000
    29     (2)  Bedford County
    30         (A)  Replacement of Bridge No.02-0101 over
    19990S0572B0686                 - 113 -

     1             Whysong Bridge in Blue Knob State Park        120,000
     2         (B)  Replacement of Bridge No.02-0103 over
     3             Camp No.2 Bridge in Blue Knob State
     4             Park                                          109,000
     5         (C)  Replacement of Bridge No.02-0108 over
     6             Camp No.1 service road in Blue Knob
     7             State Park                                    100,000
     8         (D)  Replacement of Bridge No.02-0109 over
     9             No.1 Campground in Blue Knob State
    10             Park                                           85,000
    11         (E)  Replacement of Bridge No.02-0110 over
    12             service road in Blue Knob State Park          100,000
    13     (3)  Berks County
    14         (A)  Replacement of Bridge No.06-0400 over
    15             Lenape Trail Bridge in French Creek
    16             State Park                                    120,000
    17         (B)  Replacement of Bridge No.06-0402 over
    18             Scotts Run Lake South in French Creek
    19             State Park                                    120,000
    20         (C)  Replacement of Bridge No.11-0701 over
    21             Forester Road in Nolde Forest E.E.C.          125,000
    22         (D)  Replacement of Bridge No.11-0702 over
    23             Forester Road in Nolde Forest E.E.C.          110,000
    24         (E)  Replacement of Bridge No.11-0703 over
    25             Boulevard Trail in Nolde Forest E.E.C.        135,000
    26         (F)  Replacement of Bridge No.11-0704 over
    27             Watershed Trail in Nolde Forest E.E.C.        109,000
    28         (G)  Replacement of Bridge No.11-0705 over
    29             Cabin Hollow Road in Nolde Forest
    30             E.E.C.                                        109,000
    19990S0572B0686                 - 114 -

     1     (4)  Blair County
     2         (A)  Replacement of Bridge No.18-0300 over
     3             pump house in Canoe Creek State Park          130,000
     4     (5)  Bucks County
     5         (A)  Replacement of Bridge No.16-0900 over
     6             State Park Road in Ralph Stover State
     7             Park                                          275,000
     8         (B)  Replacement of Bridge No.22-0600 over
     9             service road S.E. to Lake in Nockamixon
    10             State Park                                    100,000
    11         (C)  Replacement of Bridge No.22-0601 over
    12             Park Service Road (S.E. Lake) in
    13             Nockamixon State Park                         109,000
    14         (D)  Replacement of Bridge No.22-0602 over
    15             Park Service Road in Nockamixon State
    16             Park                                          100,000
    17         (E)  Replacement of Bridge No.25-1201 over
    18             No.1 Lake Trail Bridge in Tyler State
    19             Park                                          100,000
    20         (F)  Replacement of Bridge No.25-1202 over
    21             Mill Dairy Trail Bridge in Tyler State
    22             Park                                          109,000
    23         (G)  Replacement of Bridge No.25-1203 over
    24             Mill Dairy Trail Bridge in Tyler State
    25             Park                                          109,000
    26         (H)  Replacement of Bridge No.25-1206 over
    27             Dairy Hill Trail Bridge in Tyler State
    28             Park                                          109,000
    29         (I)  Replacement of Bridge No.25-1207 over
    30             No.1 Lake Trail Bridge in Tyler State
    19990S0572B0686                 - 115 -

     1             Park                                          109,000
     2         (J)  Replacement of Bridge No.25-1208 over
     3             No.1 Lake Trail Entrance in Tyler State
     4             Park                                          115,000
     5         (K)  Replacement of Bridge No.25-1210 over
     6             Biaker 2 Bridge in Tyler State Park           250,000
     7         (L)  Replacement of Bridge No.25-1211 over
     8             Canoe Bridge Boat House in Tyler State
     9             Park                                          225,000
    10         (M)  Replacement of Bridge No.50-0569 over
    11             Mill Creek Waste Gate in Delaware Canal
    12             State Park                                    120,000
    13         (N)  Replacement of Bridge No.50-1017 over
    14             Waste Gate in Delaware Canal State
    15             Park                                          110,000
    16         (O)  Replacement of Bridge No.50-1469 over
    17             Dr. Summers Bridge in Delaware Canal
    18             State Park                                    225,000
    19         (P)  Replacement of Bridge No.50-1523 over
    20             Waste Gate Woodside Avenue in Delaware
    21             Canal State Park                              100,000
    22         (Q)  Replacement of Bridge No.50-1594 over
    23             Mt. Eyre Waste Gate in Delaware Canal
    24             State Park                                    120,000
    25         (R)  Replacement of Bridge No.50-1609 over
    26             Mt. Eyre Road Bridge in Delaware Canal
    27             State Park                                    250,000
    28         (S)  Replacement of Bridge No.50-1634 over
    29             Milk House Camelback in Delaware Canal
    30             State Park                                    250,000
    19990S0572B0686                 - 116 -

     1         (T)  Replacement of Bridge No.50-1668 over
     2             Goat Farm Bridge in Delaware Canal
     3             State Park                                    250,000
     4         (U)  Replacement of Bridge No.50-1912 over
     5             Buckstone Davids Library in Delaware
     6             Canal State Park                              250,000
     7         (V)  Replacement of Bridge No.50-2145 over
     8             Rossiters Bridge in Delaware Canal
     9             State Park                                    250,000
    10         (W)  Replacement of Bridge No.50-2181 over
    11             Bowmans Hill Waste Gate in Delaware
    12             Canal State Park                              200,000
    13         (X)  Replacement of Bridge No.50-2374 over
    14             Middle Union Mill Bridge in Delaware
    15             Canal State Park                              250,000
    16         (Y)  Replacement of Bridge No.50-2399 over
    17             Outlet Lock Bridge in Delaware Canal
    18             State Park                                    165,000
    19         (Z)  Replacement of Bridge No.50-2423 over
    20             Dark Hollow Run Overflow in Delaware
    21             Canal State Park                              180,000
    22         (AA)  Replacement of Bridge No.50-2424 over
    23             Waste Gate Dark Hollow in Delaware
    24             Canal State Park                              112,000
    25         (BB)  Replacement of Bridge No.50-2470 over
    26             Ferry Street Bridge in Delaware Canal
    27             State Park                                    300,000
    28         (CC)  Replacement of Bridge No.50-2613 over
    29             Phillips Mill Bridge in Delaware Canal
    30             State Park                                    250,000
    19990S0572B0686                 - 117 -

     1         (DD)  Replacement of Bridge No.50-2682 over
     2             Lower Limeport Bridge in Delaware Canal
     3             State Park                                    250,000
     4         (EE)  Replacement of Bridge No.50-2721 over
     5             Upper Limeport Bridge in Delaware Canal
     6             State Park                                    250,000
     7         (FF)  Replacement of Bridge No.50-2802 over
     8             Redfield Bridge in Delaware Canal State
     9             Park                                          250,000
    10         (GG)  Replacement of Bridge No.50-2896 over
    11             Virginia Forest in Delaware Canal State
    12             Park                                          250,000
    13         (HH)  Replacement of Bridge No.50-3047 over
    14             Waste Gate over Lumberville in Delaware
    15             Canal State Park                              109,000
    16         (II)  Replacement of Bridge No.50-3100 over
    17             Lock 12 Bypass in Delaware Canal State
    18             Park                                          100,000
    19         (JJ)  Replacement of Bridge No.50-3101 over
    20             Lumberville Lock 12 in Delaware Canal
    21             State Park                                    150,000
    22         (KK)  Replacement of Bridge No.50-3206 over
    23             Waste Gate in Delaware Canal State
    24             Park                                          112,000
    25         (LL)  Replacement of Bridge No.50-3235 over
    26             Waste Gate at Lock 13 in Delaware Canal
    27             State Park                                    120,000
    28         (MM)  Replacement of Bridge No.50-3236 over
    29             Lock 13 Lock Bridge in Delaware Canal
    30             State Park                                    120,000
    19990S0572B0686                 - 118 -

     1         (NN)  Replacement of Bridge No.50-3254 over
     2             Waste Gate Whites Up Lock in Delaware
     3             Canal State Park                              125,000
     4         (OO)  Replacement of Bridge No.50-3394 over
     5             Smithtown Bridge 2 in Delaware Canal
     6             State Park                                    125,000
     7         (PP)  Replacement of Bridge No.50-3517 over
     8             Smithtown Bridge 3 in Delaware Canal
     9             State Park                                    200,000
    10         (QQ)  Replacement of Bridge NO.50-3557 over
    11             Waste Gate Kennys Lock in Delaware
    12             Canal State Park                              160,000
    13         (RR)  Replacement of Bridge No.50-3587 over
    14             Smithtown Bridge 5 in Delaware Canal
    15             State Park                                    225,000
    16         (SS)  Replacement of Bridge No.50-3617 over
    17             Lock 17 Stop Gate in Delaware Canal
    18             State Park                                    140,000
    19         (TT)  Replacement of Bridge No.50-3618 over
    20             Lock 17 Bypass Gate in Delaware Canal
    21             State Park                                    120,000
    22         (UU)  Replacement of Bridge No.50-3681 over
    23             Dark Hollow Waste Gate Bridge in
    24             Delaware Canal State Park                     140,000
    25         (VV)  Replacement of Bridge No.50-3718 over
    26             Tinicum Vehicle Bridge in Delaware
    27             Canal State Park                              160,000
    28         (WW)  Replacement of Bridge No.50-3736 over
    29             Overwrekks Waste Gate Bridge in
    30             Delaware Canal State Park                     140,000
    19990S0572B0686                 - 119 -

     1         (XX)  Replacement of Bridge No.50-3925 over
     2             Dr. Dautzeig Bridge in Delaware Canal
     3             State Park                                    120,000
     4         (YY)  Replacement of Bridge No.50-3939 over
     5             Farley Waste Gate in Delaware Canal
     6             State Park                                    100,000
     7         (ZZ)  Replacement of Bridge No.50-4131 over
     8             Hazzard Camelback Bridge in Delaware
     9             Canal State Park                              250,000
    10         (AAA)  Replacement of Bridge No.50-4182
    11             over Lodi Waste Gate Bridge in Delaware
    12             Canal State Park                              160,000
    13         (BBB)  Replacement of Bridge No.50-4236
    14             over Sphars Camelback Bridge in
    15             Delaware Canal State Park                     250,000
    16         (CCC)  Replacement of Bridge No.50-4270
    17             over Gottlieb Bridge in Delaware Canal
    18             State Park                                    250,000
    19         (DDD)  Replacement of Bridge No.50-4300
    20             over Dillieo Bridge in Delaware Canal
    21             State Park                                    250,000
    22         (EEE)  Replacement of Bridge No.50-4488
    23             over Clark's Quarry Bridge in Delaware
    24             Canal State Park                              220,000
    25         (FFF)  Replacement of Bridge No.50-4565
    26             over Overpeck's Bridge in Delaware
    27             Canal State Park                              250,000
    28         (GGG)  Replacement of Bridge No.50-4583
    29             over Narrowsville Waste Gate in
    30             Delaware Canal State Park                     130,000
    19990S0572B0686                 - 120 -

     1         (HHH)  Replacement of Bridge No.50-4673
     2             over Lock 20 Bridge in Delaware Canal
     3             State Park                                    160,000
     4         (III)  Replacement of Bridge No.50-4787
     5             over Nicholas Bridge in Delaware Canal
     6             State Park                                    250,000
     7         (JJJ)  Replacement of Bridge No.50-4860
     8             over Trauger's Steel Camelback in
     9             Delaware Canal State Park                     250,000
    10         (KKK)  Replacement of Bridge No.50-4922
    11             over Lock 21 Stop Gate in Delaware
    12             Canal State Park                              140,000
    13     (6)  Cambria County
    14         (A)  Replacement of Bridge No.11-1100 over
    15             Beaver Dam Run (Spillway) in Prince
    16             Gallitzin State Park                          300,000
    17     (7)  Cameron County
    18         (A)  Replacement of Bridge No.23-1303 over
    19             Norcross Run in Sinnemahoning State
    20             Park                                          135,000
    21         (B)  Replacement of Bridge No.24-1401 over
    22             West Cowley Run in Sizerville State
    23             Park                                          120,000
    24     (8)  Carbon County
    25         (A)  Replacement of Bridge No.09-0501 over
    26             Section Bridge in Hickory Run State
    27             Park                                          135,000
    28         (B)  Replacement of Bridge No.09-0502 over
    29             Disposal Plant Bridge in Hickory Run
    30             State Park                                    132,000
    19990S0572B0686                 - 121 -

     1         (C)  Replacement of Bridge No.09-0503 over
     2             Boulder Field Road Bridge in Hickory
     3             Run State Park                                130,000
     4         (D)  Replacement of Bridge No.09-0504 over
     5             Swimming Pool Bridge in Hickory Run
     6             State Park                                    136,000
     7         (E)  Replacement of Bridge No.33-0100 over
     8             Oldmill Road/Sawmill Run in Beltzville
     9             State Park                                    120,000
    10         (F)  Replacement of Bridge No.35-1400 over
    11             Lehigh Gorge State Park in Lehigh Gorge
    12             State Park                                    250,000
    13     (9)  Centre County
    14         (A)  Replacement of Bridge No.18-0900 over
    15             Main Park Road in Poe Valley State
    16             Park                                          224,000
    17         (B)  Replacement of Bridge No.22-0900 over
    18             Camping Bridge in Greenwood Furnace
    19             State Park                                    140,000
    20     (10)  Clearfield County
    21         (A)  Replacement of Bridge No.17-0801 over
    22             Campground Road in Parker Dam State
    23             Park                                          220,000
    24     (11)  Clinton County
    25         (A)  Replacement of Bridge No.10-0600 over
    26             Main Park Road Entrance in Hyner Run
    27             State Park                                    240,000
    28         (B)  Replacement of Bridge No.10-0601 over
    29             Hyner Run Road in Hyner Run State Park        140,000
    30     (12)  Crawford County
    19990S0572B0686                 - 122 -

     1         (A)  Replacement of Bridge No.26-1102 over
     2             Dam Overflow Bridge in Pymatuning State
     3             Park                                        1,000,000
     4         (B)  Replacement of Bridge No.26-1103 over
     5             Dam Spillway Bridge in Pymatuning State
     6             Park                                        1,539,000
     7     (13)  Cumberland County
     8         (A)  Replacement of Bridge No.10-1000 over
     9             Fuller Lake Dam Breast in Pine Grove
    10             Furnace State Park                            135,000
    11     (14)  Delaware County
    12         (A)  Replacement of Bridge No.27-1100 over
    13             South of Pa.3 Entrance in Ridley Creek
    14             State Park                                    140,000
    15         (B)  Replacement of Bridge No.27-1104 over
    16             Sycamore Mills Road in Park in Ridley
    17             Creek State Park                              130,000
    18     (15)  Erie County
    19         (A)  Replacement of Bridge No.20-1000 over
    20             Lagoon Bridge in Presque Isle State
    21             Park                                        1,500,000
    22         (B)  Replacement of Bridge No.20-1101 over
    23             Misery BSY Bridge in Presque Isle State
    24             Park                                        1,500,000
    25     (16)  Fayette County
    26         (A)  Replacement of Bridge No.11-0901 over
    27             Brunner Run Bridge in Ohiopyle State
    28             Park                                        1,000,000
    29     (17)  Franklin County
    30         (A)  Replacement of Bridge No.03-0201 over
    19990S0572B0686                 - 123 -

     1             Main Entrance Road in Caledonia State
     2             Park                                          120,000
     3         (B)  Replacement of Bridge No.03-0202 over
     4             Main Entrance Road in Caledonia State
     5             Park                                          200,000
     6         (C)  Replacement of Bridge No.23-0180 over
     7             End of Main Park Road in Buchanan's
     8             Birthplace State Park                         175,000
     9     (18)  Fulton County
    10         (A)  Replacement of Bridge No.05-0500 over
    11             Main Park Road in Cowan's Gap State
    12             Park                                          190,000
    13     (19)  Greene County
    14         (A)  Replacement of Bridge No.14-1300 over
    15             Iron Bridge Trail in Ryerson Station
    16             State Park                                    500,000
    17     (20)  Huntingdon County
    18         (A)  Replacement of Bridge No.14-1300 over
    19             Upper Picnic Area in Trough Creek State
    20             Park                                          334,000
    21     (21)  Luzerne County
    22         (A)  Replacement of Bridge No.17-1001 over
    23             Bridge No.2 Kitchen Creek in Ricketts
    24             Glen State Park                               130,000
    25     (22)  Lycoming County
    26         (A)  Replacement of Bridge No.14-0700 over
    27             Campground Road in Little Pine State
    28             Park                                          424,000
    29     (23)  Mifflin County
    30         (A)  Replacement of Bridge No.21-1200 over
    19990S0572B0686                 - 124 -

     1             Jack's Mountain Road in Reeds Gap State
     2             Park                                          176,000
     3         (B)  Replacement of Bridge No.21-1201 over
     4             Service Road in Reeds Gap State Park          100,000
     5     (24)  Montgomery County
     6         (A)  Replacement of Bridge No.34-1601 over
     7             driveway in Evansburg State Park              120,000
     8         (B)  Replacement of Bridge No.34-1602 over
     9             Service Road Bridge in Evansburg State
    10             Park                                          175,000
    11         (C)  Replacement of Bridge No.52-1500 over
    12             High Arch Bridge in Norristown Farm
    13             Park                                          625,000
    14         (D)  Replacement of Bridge No.52-1501 over
    15             Meadow Bridge in Norristown Farm Park         500,000
    16         (E)  Replacement of Bridge No.52-1502 over
    17             Lower Farm Road Bridge No.2 in
    18             Norristown Farm Park                          700,000
    19         (F)  Replacement of Bridge No.52-1503 over
    20             Lower Farm Road/Piggery Road in
    21             Norristown Farm Park                          125,000
    22         (G)  Replacement of Bridge No.52-1504 over
    23             Lower Farm Road/Stony Road in
    24             Norristown Farm Park                        1,500,000
    25         (H)  Replacement of Bridge No.52-1506 over
    26             Stanbridge Street Extension in
    27             Norristown Farm Park                          700,000
    28         (I)  Replacement of Bridge No.52-1507 over
    29             Small Railroad Bridge in Norristown
    30             Farm Park                                     140,000
    19990S0572B0686                 - 125 -

     1     (25)  Northampton County
     2         (A)  Replacement of Bridge No.07-0000 over
     3             Henry Homestead Bridge in Jacobsburg E.
     4             E. Center                                     120,000
     5         (B)  Replacement of Bridge No.50-5135 over
     6             Rocky Falls Waste Gate in Delaware
     7             Canal State Park                              120,000
     8         (C)  Replacement of Bridge No.50-5371 over
     9             Raubsville P./S. Bridge in Delaware
    10             Canal State Park                              200,000
    11         (D)  Replacement of Bridge No.50-5417 over
    12             Raubsville Camelback Bridge in Delaware
    13             Canal State Park                              200,000
    14         (E)  Replacement of Bridge No.50-5472 over
    15             Browns Terrace Bridge in Delaware Canal
    16             State Park                                    200,000
    17         (F)  Replacement of Bridge No.50-5657 over
    18             Stop Gate Bridge 56.570 in Delaware
    19             Canal State Park                              250,000
    20         (G)  Replacement of Bridge No.50-5887 over
    21             Lock 24 East in Delaware Canal State
    22             Park                                          160,000
    23         (H)  Replacement of Bridge No.50-5888 over
    24             Lock 24 Bridge in Delaware Canal State
    25             Park                                          160,000
    26         (I)  Replacement of Bridge No.50-5889 over
    27             Lock 24 West in Delaware Canal State
    28             Park                                          160,000
    29     (26)  Perry County
    30         (A)  Replacement of Bridge No.17-0803 over
    19990S0572B0686                 - 126 -

     1             maintenance road in Little Buffalo
     2             State Park                                    120,000
     3     (27)  Pike County
     4         (A)  Replacement of Bridge No.14-0800 over
     5             Big Inlet in Promised Land State Park         130,000
     6         (B)  Replacement of Bridge No.14-0802 over
     7             Lower Lake Road in Promised Land State
     8             Park                                        1,000,000
     9     (28)  Somerset County
    10         (A)  Replacement of Bridge No.06-0400 over
    11             Main Road Bridge No.1 in Kooser State
    12             Park                                          130,000
    13         (B)  Replacement of Bridge No.06-0401 over
    14             Main Road Bridge No.2 in Kooser State
    15             Park                                          130,000
    16         (C)  Replacement of Bridge No.06-0402 over
    17             Van Dyke Picnic Area in Kooser State
    18             Park                                          120,000
    19         (D)  Replacement of Bridge No.07-0503 over
    20             Main Road Forge Bridge No.1 in Laurel
    21             Hill State Park                               500,000
    22         (E)  Replacement of Bridge No.07-0505 over
    23             Main Road Jones Bridge No.2 in Laurel
    24             Hill State Park                               300,000
    25     (29)  Tioga County
    26         (A)  Replacement of Bridge No.09-0500 over
    27             Hills Creek Lake in Hills Creek State
    28             Park                                          400,000
    29     (30)  Union County
    30         (A)  Replacement of Bridge No.20-1000 over
    19990S0572B0686                 - 127 -

     1             Service Road to Beach in R.B. Winter
     2             State Park                                    120,000
     3     (31)  Westmoreland County
     4         (A)  Replacement of Bridge No.05-0300 over
     5             Main Picnic Area in Keystone State
     6             Park                                          100,000
     7         (B)  Replacement of Bridge No.08-0700 over
     8             Adams Falls Picnic Area in Linn Run
     9             State Park                                    140,000
    10         (C)  Replacement of Bridge No.08-0701 over
    11             Cabins 9 and 10 Access Road in Linn Run
    12             State Park                                    160,000
    13  Section 9.  Itemization of Pennsylvania Game Commission Capital
    14                 Projects.
    15     The individual capital projects in the category of public
    16  improvement projects to be acquired by the Pennsylvania Game
    17  Commission and to be financed from current revenues of the Game
    18  Fund pursuant to executive authorizations are hereby itemized,
    19  together with their respective estimated costs, as follows:
    20                                                           Total
    21                                                          Project
    22             Project                                    Allocation
    23  (1)  Pennsylvania Game Commission
    24     (i)  Blair and Cambria Counties
    25         (A)  Land Allocation                              731,000
    26     (ii)  Huntingdon County
    27         (A)  Land Allocation                            1,076,000
    28     (iii)  Sullivan County
    29         (A)  Land Allocation                              120,000
    30  Section 10.  Itemization of Pennsylvania Fish and Boat
    19990S0572B0686                 - 128 -

     1                 Commission Capital Projects.
     2     (a)  Projects to be financed from current revenues.--The
     3  individual capital projects in the category of public
     4  improvement projects to be acquired or developed by the
     5  Pennsylvania Fish and Boat Commission and to be financed from
     6  current revenues of the Fish Fund and the Boat Fund pursuant to
     7  executive authorizations are hereby itemized, together with
     8  their respective estimated costs, as follows:
     9                                                           Total
    10                                                          Project
    11             Project                                    Allocation
    12  (1)  Pennsylvania Fish and Boat Commission
    13     (i)  Cumberland County
    14         (A)  Big Spring Fish Culture Station,
    15             electrical system expansion                   375,000
    16             (Base Project Allocation - $338,000)
    17             (Design and Contingencies - $37,000)
    18     (ii)  Erie County
    19         (A)  Corry Fish Culture Station,
    20             construction of an effluent
    21             retention/treatment system                    175,000
    22             (Base Project Allocation - $160,000)
    23             (Design and Contingencies - $15,000)
    24         (B)  North East Marina, breakwall
    25             reconstruction                                800,000
    26             (Base Project Allocation - $800,000)
    27     (iii)  Jefferson County
    28         (A)  Cloe Lake, reconstruction of dam and
    29             spillway                                      750,000
    30             (Base Project Allocation - $675,000)
    19990S0572B0686                 - 129 -

     1             (Design and Contingencies - $75,000)
     2     (iv)  Juniata County
     3         (A)  Van Dyke Shad Station, construction of
     4             an effluent retention/treatment system        200,000
     5             (Base Project Allocation - $180,000)
     6             (Design and Contingencies - $20,000)
     7     (v)  Potter County
     8         (A)  Oswego Fish Culture Station,
     9             construction of an effluent
    10             retention/treatment system                     28,000
    11             (Base Project Allocation - $25,000
    12             (Design and Contingencies - $3,000)
    13  Section 11.  State forestry bridge projects itemized.
    14     Projects in the category of State forestry bridge projects to
    15  be constructed by the Department of Conservation and Natural
    16  Resources, its successors or assigns, and to be financed by oil
    17  company franchise tax revenues pursuant to 75 Pa.C.S. §
    18  9502(a)(2)(iv) (relating to imposition of tax), are hereby
    19  itemized, together with their respective estimated costs, as
    20  follows:
    21  (a)  State Bridges
    22     (1)  Adams County
    23         (A)  Replacement of Bridge No.01-0005,
    24             District Road Bridge over Carbaugh Run        250,000
    25         (B)  Replacement of Bridge No.01-0004, Dead
    26             Womans Hollow Road Bridge over Mountain
    27             Creek                                         150,000
    28     (2)  Bedford County
    29         (A)  Replacement of Bridge No.02-0002,
    30             Wertz Road Bridge over Cove Creek             100,000
    19990S0572B0686                 - 130 -

     1         (B)  Replacement of Bridge No.02-0001,
     2             Wertz Road Bridge over Cove Creek             150,000
     3     (3)  Cameron County
     4         (A)  Replacement of Bridge No.13-0012,
     5             Brooks Run Road Bridge over Brooks
     6             Road                                          220,000
     7         (B)  Replacement of Bridge No.13-0037, Mix
     8             Run Road Bridge over Mix Run                  240,000
     9         (C)  Replacement of Bridge No.13-0038, Mix
    10             Run Road over Mix Run                         200,000
    11         (D)  Replacement of Bridge No.13-0060,
    12             Brooks State House Bridge over Brooks
    13             Road                                          250,000
    14     (4)  Centre County
    15         (A)  Replacement of Bridge No.07-0010,
    16             Siglerville Millheim Pike Bridge              162,000
    17         (B)  Replacement of Bridge No.07-0015,
    18             Green Valley Road Bridge                      260,000
    19         (C)  Replacement of Bridge No.07-0033, Pine
    20             Creek Road Bridge                             386,000
    21         (D)  Replacement of Bridge No.07-0045,
    22             McCall Dam Road Bridge over White Deer
    23             Creek                                         180,000
    24         (E)  Replacement of Bridge No.09-0030, Six
    25             Mile Run Bridge                               192,000
    26         (F)  Replacement of Bridge No.10-0028,
    27             State Line Road Bridge                        196,000
    28         (G)  Replacement of Bridge No.05-0003,
    29             Krise Valley Road Bridge over Potter
    30             Run                                           100,000
    19990S0572B0686                 - 131 -

     1         (H)  Replacement of Bridge No.05-0004, Bear
     2             Meadows Road Bridge over Sinking Creek        100,000
     3         (I)  Replacement of Bridge No.05-0005, Bear
     4             Meadows Road Bridge over Galbraith Run        150,000
     5         (J)  Replacement of Bridge No.07-0007, Poe
     6             Paddy Drive Bridge over Big Poe Creek         170,000
     7         (K)  Replacement of Bridge No.07-0008, Poe
     8             Valley Road Bridge over Big Poe Creek         200,000
     9         (L)  Replacement of Bridge No.07-0028,
    10             Cherry Run Road Bridge over Cherry Run        102,000
    11         (M)  Replacement of Bridge No.07-0029,
    12             Cherry Run Road Bridge over Cherry Run        240,000
    13         (N)  Replacement of Bridge No.07-0035,
    14             Stoney Run Road Bridge over Pine Creek        375,000
    15         (O)  Replacement of Bridge No.09-0026,
    16             Huckleberry Road Bridge over Black
    17             Moshannon Creek                               250,000
    18         (P)  Replacement of Bridge No.09-0029,
    19             Claymine Road Bridge over Six Mile Run        200,000
    20         (Q)  Replacement of Bridge No.10-0026,
    21             Panther Road Bridge over Wolf Run             150,000
    22         (R)  Replacement of Bridge No. 67-0007, Poe
    23             Paddy Drive over Big Poe Creek                340,000
    24     (5)  Clearfield County
    25         (A)  Replacement of Bridge No.09-0005,
    26             Tyler Road Bridge over Laurel Run             284,000
    27         (B)  Replacement of Bridge No.09-0012,
    28             Little Medix Road Bridge over Little
    29             Medix Run                                     220,000
    30         (C)  Replacement of Bridge No.09-0013,
    19990S0572B0686                 - 132 -

     1             Little Medix Road Bridge over Little
     2             Medix Run                                     100,000
     3         (D)  Replacement of Bridge No.09-0014,
     4             Little Medix Road Bridge over Little
     5             Medix Run                                     100,000
     6         (E)  Replacement of Bridge No.09-0015,
     7             Little Medix Road Bridge over Little
     8             Medix Run                                     100,000
     9         (F)  Replacement of Bridge No.09-0018,
    10             Dent's Branch Road Bridge                     160,000
    11         (G)  Replacement of Bridge No.09-0019,
    12             Dent's Branch Road Bridge over Dent's
    13             Branch Street                                 282,000
    14         (H)  Replacement of Bridge No.09-0020,
    15             Dent's Branch Road Bridge over Dent's
    16             Branch Street                                 165,000
    17         (I)  Replacement of Bridge No.09-0021, Ames
    18             Road Bridge over Deer Creek                   145,000
    19         (J)  Replacement of Bridge No.09-0022,
    20             Merrill Road Bridge                           197,000
    21         (K)  Replacement of Bridge No.09-0023, Lost
    22             Run Road Bridge over Giffor Run               138,000
    23         (L)  Replacement of Bridge No.09-0034,
    24             Reservoir Road Bridge over Upper Three
    25             Run                                           120,000
    26     (6)  Clinton County
    27         (A)  Replacement of Bridge No.07-0054, Long
    28             Run                                            91,000
    29         (B)  Replacement of Bridge No.07-0055, over
    30             Cooper Run                                     70,000
    19990S0572B0686                 - 133 -

     1         (C)  Replacement of Bridge No.10-0032,
     2             Cooks Run Road Bridge over Crowley Run        145,000
     3         (D)  Replacement of Bridge No.10-0033,
     4             Cooks Run Road Bridge over Cooks Run          110,000
     5         (E)  Replacement of Bridge No.10-0035,
     6             Bridge over Camp Run                          100,000
     7         (F)  Replacement of Bridge No.10-0036, over
     8             Rock Run                                       90,000
     9         (G)  Replacement of Bridge No.10-0037,
    10             Bridge over Cooks Run                         160,000
    11         (H)  Replacement of Bridge No.10-0042, Two
    12             Mile Road Bridge                              100,000
    13         (I)  Replacement of Bridge No.10-0043, Big
    14             Basin Road Bridge over Shintown Run           206,000
    15         (J)  Replacement of Bridge No.10-0044,
    16             Robbins Road Bridge over Shintown Run         120,000
    17         (K)  Replacement of Bridge No.10-0051, Fork
    18             Hill Road Bridge over Lebo Run                168,000
    19         (L)  Replacement of Bridge No.10-0052, Left
    20             Branch Young Womans Road Bridge over
    21             Mud Lick Run                                  140,000
    22         (M)  Replacement of Bridge No.10-0053, Left
    23             Branch Young Womans Road Bridge over
    24             Shingle Branch                                145,000
    25         (N)  Replacement of Bridge No.10-0054, Left
    26             Branch Young Womans Road Bridge over
    27             Greenlick Run                                 135,000
    28         (O)  Replacement of Bridge No.10-0057,
    29             Sandy Run Road Bridge over Paddy Run          140,000
    30         (P)  Replacement of Bridge No.10-0059,
    19990S0572B0686                 - 134 -

     1             Bridge over Right Branch of Young
     2             Womans Creek Road                             287,000
     3         (Q)  Replacement of Bridge No.10-0061,
     4             Graham Road Bridge over Ferney Run            135,000
     5         (R)  Replacement of Bridge No.10-0063,
     6             Hyner Run Road Bridge over Long Fork          110,000
     7         (S)  Replacement of Bridge No.10-0064,
     8             Trout Run Bridge                              255,000
     9         (T)  Replacement of Bridge No.12-0032,
    10             Gotshall Road Bridge over Gotshall Run        120,000
    11         (U)  Replacement of Bridge No.15-0021,
    12             County Line Road Bridge                       167,000
    13         (V)  Replacement of Bridge No.10-003,
    14             Carrier Road over Lick Run                    240,000
    15         (W)  Replacement of Bridge No.10-0016,
    16             Hyner Run Road over Left Branch Hyner
    17             Run                                           260,000
    18     (7)  Cumberland County
    19         (A)  Replacement of Bridge No.01-0006,
    20             Woodrow Road Run Bridge over Mountain
    21             Creek                                         150,000
    22         (B)  Replacement of Bridge No.01-0008,
    23             Strohms Hollow Road Bridge over Strohms
    24             Hollow Run                                    138,000
    25         (C)  Replacement of Bridge No.01-0010,
    26             Milesburn Road Bridge                         102,000
    27         (D)  Replacement of Bridge No.01-0023, Togg
    28             Run Road Bridge over Togg Run                 138,000
    29         (E)  Replacement of a large culvert, Bid
    30             Pond Road over Hairy Spring Run               120,000
    19990S0572B0686                 - 135 -

     1     (8)  Dauphin County
     2         (A)  Replacement of large culvert, White
     3             Oak Road Bridge over White Oak Run            100,000
     4     (9)  Elk County
     5         (A)  Replacement of Bridge No.09-0006,
     6             Blackwell Road Bridge over Laurel Road        470,000
     7         (B)  Replacement of Bridge No.13-0028,
     8             Porcupine Road Bridge over Dent's Run         183,000
     9         (C)  Replacement of Bridge No.13-0032,
    10             Dent's Run Road Bridge over Little
    11             Dent's Run                                    110,000
    12         (D)  Replacement of Bridge No.13-0039, Mix
    13             Run Road Bridge over Red Run                  184,000
    14         (E)  Replacement of Bridge No.13-0040, Red
    15             Run Road Bridge                               160,000
    16         (F)  Replacement of Bridge No.13-0049,
    17             Shaffer Draft Road Bridge                     175,000
    18         (G)  Replacement of Bridge No.13-0050, West
    19             Hicks Run Road Bridge                         175,000
    20         (H)  Replacement of Bridge No.13-0052,
    21             Bridge over East Branch of Hicks Run          175,000
    22         (I)  Replacement of Bridge No.13-0053,
    23             Bridge over East Branch of Hicks Run          175,000
    24         (J)  Replacement of Bridge No.13-0026,
    25             Dent's Run Road over Bell Draft               160,000
    26     (10)  Franklin County
    27         (A)  Replacement of Bridge No.01-0016, Wirt
    28             Road Bridge                                   147,000
    29         (B)  Replacement of Bridge No.01-0019,
    30             Biesecker Gap Road Bridge over
    19990S0572B0686                 - 136 -

     1             Biesecker Run                                 110,000
     2         (C)  Replacement of Bridge No.01-0022,
     3             Rattlesnake Run Road Bridge                   149,000
     4         (D)  Replacement of Bridge No.01-0021,
     5             Lindsay Lot Road Bridge over Furnace
     6             Run                                           100,000
     7         (E)  Replacement of a large culvert, Staley
     8             Road over Travelers Spring                    120,000
     9         (F)  Replacement of Bridge No.01-0017,
    10             District Road over Raccoon Run                210,000
    11     (11)  Huntingdon County
    12         (A)  Replacement of Bridge No.05-0010,
    13             Martin Road Bridge over Standing Stone
    14             Creek                                         173,000
    15         (B)  Replacement of Bridge No.05-0011,
    16             Pennsylvania Furnace Road Bridge over
    17             Globe Run                                     140,000
    18         (C)  Replacement of Bridge No.05-0012,
    19             Colerain Road Bridge                          235,000
    20         (D)  Replacement of Bridge No.05-0014,
    21             Coopers Gap Road Bridge                       160,000
    22         (E)  Replacement of Bridge No.05-0017, Pine
    23             Swamp Road Bridge over Shaver Creek           150,000
    24         (F)  Replacement of Bridge No.05-0018,
    25             Beidler Road Bridge over Laurel Run           142,000
    26         (G)  Replacement of Bridge No.05-0019,
    27             Stone Creek Road over Detweiler Run            60,000
    28         (H)  Replacement of Bridge No.05-0020, Rag
    29             Hollow Road Bridge over East Branch
    30             Stone Creek                                   150,000
    19990S0572B0686                 - 137 -

     1         (I)  Replacement of Bridge No.05-0021,
     2             Stone Creek Road Bridge                       182,000
     3         (J)  Replacement of Bridge No.05-0022,
     4             Seeger Road over Stoive Creek                  70,000
     5         (K)  Replacement of Bridge No.05-0026,
     6             Pennsylvania Furnace Road Bridge over
     7             Pennsylvania Furnace Run                      110,000
     8         (L)  Replacement of Bridge No.05-0027,
     9             Diamond Valley Road Bridge over Globe
    10             Run                                           100,000
    11         (M)  Replacement of Bridge No.05-0028,
    12             Laurel Run Road Bridge                        213,000
    13         (N)  Replacement of Bridge No.05-0051,
    14             Coopers Gap Road Bridge                       174,000
    15     (12)  Jefferson County
    16         (A)  Replacement of Bridge No.08-0001,
    17             Corbett Road Bridge over Clear Creek          170,000
    18         (B)  Replacement of Bridge No.08-0003,
    19             Callen Run Road Bridge over Callen Run        200,000
    20     (13)  Juniata County
    21         (A)  Replacement of Bridge No.03-0005, East
    22             Licking Drive Bridge over East Licking
    23             Creek                                         242,000
    24         (B)  Replacement of Bridge No.03-0006, East
    25             Licking Drive Bridge over East Licking
    26             Creek                                         222,000
    27         (C)  Replacement of Bridge No.03-0007,
    28             Spectacle Gap Bridge                          158,000
    29     (14)  Lackawanna County
    30         (A)  Replacement of Bridge No.11-9000,
    19990S0572B0686                 - 138 -

     1             Sassafras Road over Spring Run                 80,000
     2     (15)  Lycoming County
     3         (A)  Replacement of Bridge No.12-0013,
     4             Hillgrove Road Bridge over Pleasant
     5             Stream                                        150,000
     6         (B)  Replacement of Bridge No.12-0015, Rock
     7             Run Road Bridge                               175,000
     8         (C)  Replacement of Bridge No.12-0016, Rock
     9             Run Road Bridge                               164,000
    10         (D)  Replacement of Bridge No.12-0017,
    11             Yellow Dog Road Bridge over Rock Run          245,000
    12         (E)  Replacement of Bridge No.12-0019,
    13             Little Bear Bridge                            193,000
    14         (F)  Replacement of Bridge No.12-0020,
    15             Little Bear Bridge                            193,000
    16         (G)  Replacement of Bridge No.12-0021,
    17             Little Bear Bridge                            193,000
    18         (H)  Replacement of Bridge No.12-0022,
    19             Little Bear Creek Road Bridge                 237,000
    20         (I)  Replacement of Bridge No.12-0023,
    21             Little Bear Road Bridge over Little
    22             Bear Creek                                    120,000
    23         (J)  Replacement of Bridge No.12-0027, Cove
    24             Road Bridge over Fourth Gap                   140,000
    25         (K)  Replacement of Bridge No.12-0028,
    26             Fourth Gap Road Bridge                        100,000
    27         (L)  Replacement of Bridge No.12-0040,
    28             English Run Road Bridge over English
    29             Run                                           238,000
    30         (M)  Replacement of Bridge No.12-0046,
    19990S0572B0686                 - 139 -

     1             Morris Run Road Bridge over Slate Run         240,000
     2         (N)  Replacement of Large Culvert, Frances
     3             Road at Big Hollow                            100,000
     4         (O)  Replacement of Bridge No.12-0032,
     5             Gottshall Road over Gottshall Run             150,000
     6     (16)  Mifflin County
     7         (A)  Replacement of Bridge No.03-0008,
     8             Spectacle Gap Road Bridge over East
     9             Licking Creek                                 150,000
    10         (B)  Replacement of Bridge No.05-0051,
    11             Cooper Gap Road Bridge over Cooper Gap
    12             Run                                           172,000
    13         (C)  Replacement of Bridge No.07-0003,
    14             Havice Valley Road Bridge over Swift
    15             Run                                           125,000
    16         (D)  Replacement of Bridge No.07-0004,
    17             Havice Valley Road Bridge over Panther
    18             Run                                           257,000
    19         (E)  Replacement of Bridge No.07-0057,
    20             Stillhouse Hollow Road Bridge over
    21             Greens Valley Street                          128,000
    22     (17)  Monroe County
    23         (A)  Replacement of Bridge No.19-0001,
    24             Laurel Run Road Bridge                        159,000
    25     (18)  Perry County
    26         (A)  Replacement of Bridge No.03-0010, Elk
    27             Hill Road Bridge                              152,000
    28         (B)  Replacement of Bridge No.03-0011, Elk
    29             Hill Road Bridge                              152,000
    30         (C)  Replacement of Bridge No.03-0014,
    19990S0572B0686                 - 140 -

     1             Laurel Run Road Bridge over Laurel Run,
     2             North Branch                                  100,000
     3         (D)  Replacement of Bridge No.03-0015,
     4             Sheaffer Run Bridge, undermining at
     5             south abutment                                150,000
     6         (E)  Replacement of Bridge No.03-0016,
     7             Laurel Run Road Bridge                        185,000
     8         (F)  Replacement of Bridge No.03-0018, Twin
     9             Bridge over Laurel Run                        180,000
    10         (G)  Replacement of Culvert, Shearer dug
    11             box culvert                                   100,000
    12     (19)  Pike County
    13         (A)  Replacement of Bridge No.19-0002, Hay
    14             Road Bridge over Middle Branch                115,000
    15         (B)  Replacement of Bridge No.19-0004, Pine
    16             Flats Run Road Bridge                         160,000
    17         (C)  Replacement of Bridge No.19-0005,
    18             Bruce Lake Road Bridge over tributary
    19             Egypt Meadow Lake                             120,000
    20         (D)  Replacement of Bridge No.19-0803,
    21             Bruce Lake Road Bridge over Egypt
    22             Meadow Lake                                   145,000
    23     (20)  Potter County
    24         (A)  Replacement of Bridge No.15-0003,
    25             Jones Run Road Bridge over Freeman Run        175,000
    26         (B)  Replacement of Bridge No.15-0010,
    27             Black Diamond Road Bridge over Big
    28             Moores Run                                    163,000
    29         (C)  Replacement of Bridge No.15-0011,
    30             Horton Run Road Bridge over East Fork
    19990S0572B0686                 - 141 -

     1             Sinnemahoning Creek                           125,000
     2         (D)  Replacement of Bridge No.15-0012,
     3             Bailey Run Bridge over Bailey Run             250,000
     4         (E)  Replacement of Bridge No.15-0013,
     5             Windfall Road Bridge                          196,000
     6         (F)  Replacement of Bridge No.15-0014,
     7             Hungry Hollow Road Bridge over Cross
     8             Fork Creek                                    192,000
     9         (G)  Replacement of Bridge No.15-0015,
    10             Joerg Run Road Bridge                         135,000
    11         (H)  Replacement of Bridge No.15-0018, Lebo
    12             Run Road Bridge                               148,000
    13         (I)  Replacement of Bridge No.15-0019,
    14             Twelve Mile Bridge over Spring Brook          107,000
    15         (J)  Replacement of Bridge No.15-0020,
    16             Robinson Road Bridge                          230,000
    17         (K)  Replacement of Bridge No.15-0024,
    18             Robinson Road Bridge                          140,000
    19         (L)  Replacement of Bridge No.15-0025,
    20             Nelson Run Road Bridge over Big Nelson
    21             Run                                           138,000
    22         (M)  Replacement of Bridge No.15-0027,
    23             Ellis Hollow Road Bridge over Nine Mile
    24             Run                                           146,000
    25         (N)  Replacement of Bridge No.16-0015,
    26             Butternut Hollow Road Bridge over
    27             Kettle Creek                                  110,000
    28     (21)  Schuykill County
    29         (A)  Replacement of Bridge No.18-0003,
    30             Panther Road Bridge over Panther Creek         80,000
    19990S0572B0686                 - 142 -

     1     (22)  Snyder County
     2         (A)  Replacement of Bridge No.07-0025,
     3             Swift Run Road Bridge over Swift Run          138,000
     4     (23)  Somerset County
     5         (A)  Replacement of Bridge No.04-0002, Blue
     6             Hole Road Bridge                              192,000
     7         (B)  Replacement of Bridge No.04-0004,
     8             South Wolf Run Road Bridge over Tub
     9             Mill Run                                      184,000
    10         (C)  Replacement of Bridge No.04-0006,
    11             Jones Mill Run Road Bridge over Jones
    12             Mill Run                                      140,000
    13         (D)  Replacement of Bridge No.04-0008, Cole
    14             Run Road Bridge                               138,000
    15         (E)  Replacement of Bridge No.06-0002,
    16             State Forest Road Bridge over Tributary
    17             to Roaring Fork                                82,000
    18         (F)  Replacement of Bridge No.06-0004,
    19             Shade Road Bridge over Mile Run               131,000
    20     (24)  Sullivan County
    21         (A)  Replacement of Bridge No.20-0002,
    22             Brunnerdale Road Bridge                       220,000
    23         (B)  Replacement of Bridge No.20-0004, Mill
    24             Creek Road Bridge over Mill Creek             135,000
    25         (C)  Replacement of Bridge No.20-0005, Mill
    26             Creek Road Bridge over Mill Creek             100,000
    27         (D)  Replacement of Bridge No.20-0008,
    28             Shanerburg Road Bridge                        212,000
    29         (E)  Replacement of Bridge No.20-0011,
    30             Shanerburg Road Bridge over Shanerburg
    19990S0572B0686                 - 143 -

     1             Run                                           110,000
     2         (F)  Replacement of a large culvert,
     3             Brunnerdale Road over Ogdonia Run             100,000
     4         (G)  Replacement of a large culvert,
     5             Mineral Spring Road over Double Run           140,000
     6     (25)  Tioga County
     7         (A)  Replacement of Bridge No.12-0002, Left
     8             Asaph over Baker Branch                       200,000
     9         (B)  Replacement of Bridge No.12-0049,
    10             Francis Road Bridge over Francis
    11             Branch                                        150,000
    12         (C)  Replacement of Bridge No.16-0003, Left
    13             Asaph Road Bridge over Left Asaph Run         186,000
    14         (D)  Replacement of Bridge No.16-0004, Left
    15             Asaph Road Bridge                             248,000
    16         (E)  Replacement of Bridge No.16-0005,
    17             Asaph Run Bridge                              414,000
    18         (F)  Replacement of Bridge No.16-0008,
    19             Owasse Road Bridge over Chimney Hollow        120,000
    20         (G)  Replacement of Bridge No.16-0010,
    21             Painter Leetonia Road Bridge                  170,000
    22         (H)  Replacement of Bridge No.16-0011,
    23             Cedar Run Bridge                              170,000
    24         (I)  Replacement of Bridge No.16-0015,
    25             Butternut Hollow Road Bridge over
    26             Kettle Creek                                  145,000
    27         (J)  Replacement of Bridge No.16-0016, Bear
    28             Run Road Bridge over Cushman Branch           160,000
    29         (K)  Replacement of Bridge No.16-0018, Mine
    30             Hole Road Bridge over Mine Hole Run           150,000
    19990S0572B0686                 - 144 -

     1         (L)  Replacement of Bridge No.16-0020, Mine
     2             Hole Road Bridge                              107,000
     3         (M)  Replacement of Bridge No.16-0002, Lt.
     4             Asaph Road over Baker Branch                  180,000
     5     (26)  Union County
     6         (A)  Replacement of Bridge No.07-0016,
     7             Hoofnagle Road Bridge                         235,000
     8         (B)  Replacement of Bridge No.07-0017,
     9             Weikert Run Road Bridge                       235,000
    10         (C)  Replacement of Bridge No.07-0040, Pine
    11             Creek Road Bridge over Rapid Run              165,000
    12         (D)  Replacement of Bridge No.07-0041,
    13             Brandon Road Bridge over North Branch
    14             of Buffalo Creek                              107,000
    15         (E)  Replacement of Bridge No.07-0046,
    16             Cooper Mill Road Bridge over White Deer
    17             Creek                                         212,000
    18         (F)  Replacement of Bridge No.07-0047,
    19             White Deer Creek Road Bridge                  234,000
    20         (G)  Replacement of Bridge No.07-0048,
    21             White Deer Creek Road Bridge over White
    22             Deer Creek                                    235,000
    23     (27)  Westmoreland County
    24         (A)  Replacement of Bridge No.04-0011, Linn
    25             Run Road Bridge over Linn Run                 125,000
    26         (B)  Replacement of Bridge No.04-0012, Linn
    27             Run Road Bridge over Rock Run                 135,000
    28         (C)  Replacement of Bridge No.04-0013, Linn
    29             Run Road over Grove Run                       100,000
    30  Section 12.  Project to be financed from Drug Forfeiture
    19990S0572B0686                 - 145 -

     1                 Revenues.
     2     The individual capital project in the category of public
     3  improvement projects to be developed by the Department of
     4  General Services for the Pennsylvania State Police and to be
     5  financed from drug forfeiture revenues is hereby itemized,
     6  together with its respective itemized cost as follows:
     7                                                             Total
     8                                                           Project
     9             Project                                    Allocation
    10  (1)  Pennsylvania State Police
    11     (i)  State Police Academy, Dauphin County
    12         (A)  Construction of Canine Drug
    13             Enforcement Facility                          300,000
    14             (Base Project Allocation - $250,000)
    15             (Design and Contingencies - $50,000)
    16  Section 13.  Limited waiver of local requirements.
    17     (a)  Waivers for current itemizations.--The limitation on
    18  Department of Transportation funding of capital projects under
    19  74 Pa.C.S. § 1302(4) (relating to program authorizations) shall
    20  be totally waived for the capital projects in the category of
    21  transportation assistance projects for mass transit contained in
    22  section 5(a)(10)(iii), (iv), (xi), (xii), (xiii), (xiv) and (xv)
    23  and (12)(xii), (xiii) and (xiv).
    24     (b)  Limited waiver of local requirement for 1997
    25  itemization.--Notwithstanding any provision to the contrary, the
    26  limitation on Department of Transportation funding of capital
    27  projects under 74 Pa.C.S. § 1302(4) (relating to program
    28  authorizations) shall be totally waived for the capital projects
    29  in the category of transportation assistance projects for mass
    30  transit contained in section 5(a)(16)(xxxi) and (xxxii) of the
    19990S0572B0686                 - 146 -

     1  Act of October 10, 1997 (P.L.392, No.47), known as the Capital
     2  Budget Project Itemization Act for 1996-1997.
     3  Section 14.  Debt authorization.
     4     (a)  Public improvements.--The Governor, Auditor General and
     5  State Treasurer are hereby authorized and directed to borrow
     6  from time to time in addition to any authorization heretofore or
     7  hereafter enacted, on the credit of the Commonwealth, subject to
     8  the limitations provided in the current capital budget, money
     9  not exceeding in the aggregate the sum of $1,152,466,000          <--
    10  $1,359,712,000 as may be found necessary to carry out the
    11  acquisition and construction of the public improvement projects
    12  specifically itemized in a capital budget.
    13     (b)  Furniture and equipment.--The Governor, Auditor General
    14  and State Treasurer are hereby authorized and directed to borrow
    15  from time to time in addition to any authorization heretofore or
    16  hereafter enacted, on the credit of the Commonwealth, subject to
    17  the limitations provided in the current capital budget, money
    18  not exceeding in the aggregate the sum of $74,517,000             <--
    19  $91,517,000 as may be found necessary to carry out the public
    20  improvement projects consisting of the acquisition of original
    21  movable furniture and equipment specifically itemized in a
    22  capital budget.
    23     (c)  Transportation assistance.--The Governor, Auditor
    24  General and State Treasurer are hereby authorized and directed
    25  to borrow from time to time in addition to any authorization
    26  heretofore or hereafter enacted, on the credit of the
    27  Commonwealth, subject to the limitations provided in the current
    28  capital budget, money not exceeding in the aggregate the sum of
    29  $641,224,000 $695,894,000 as may be found necessary to carry out  <--
    30  the acquisition and construction of the transportation
    19990S0572B0686                 - 147 -

     1  assistance projects specifically itemized in a capital budget.
     2     (d)  Redevelopment assistance.--Subject to the limitation in
     3  section 317(b) of the act of February 1, 1999 (P.L.  , No.1),
     4  known as the Capital Facilities Debt Enabling Act, the Governor,
     5  Auditor General and State Treasurer are hereby authorized and
     6  directed to borrow from time to time in addition to any
     7  authorization heretofore or hereafter enacted, on the credit of
     8  the Commonwealth, subject to the limitations provided in the
     9  current capital budget, money not exceeding in the aggregate the
    10  sum of $1,934,500,000 $2,037,078,000 as may be found necessary    <--
    11  to carry out the redevelopment assistance and the redevelopment
    12  capital assistance projects specifically itemized in a capital
    13  budget.
    14     (e)  Flood control.--The Governor, Auditor General and State
    15  Treasurer are hereby authorized and directed to borrow from time
    16  to time in addition to any authorization heretofore or hereafter
    17  enacted, on the credit of the Commonwealth, subject to the
    18  limitations provided in the current capital budget, money not
    19  exceeding in the aggregate the sum of $44,458,000 as may be
    20  found necessary to carry out the acquisition and construction of
    21  the flood control projects specifically itemized in a capital
    22  budget.
    23  Section 15.  Issue of bonds.
    24     The indebtedness authorized in this act shall be incurred,
    25  from time to time, and shall be evidenced by one or more series
    26  of general obligation bonds of the Commonwealth in such
    27  aggregate principal amount for each series as the Governor, the
    28  Auditor General and the State Treasurer shall determine, but the
    29  latest stated maturity date shall not exceed the estimated
    30  useful life of the projects being financed as stated in section
    19990S0572B0686                 - 148 -

     1  16.
     2  Section 16.  Estimated useful life and term of debt.
     3     (a)  Estimated useful life.--The General Assembly states that
     4  the estimated useful life of the public improvement projects
     5  itemized in this act is as follows:
     6         (1)  Public improvement projects, 30 years.
     7         (2)  Furniture and equipment projects, 10 years.
     8         (3)  Transportation assistance projects:
     9             (i)  Rolling stock, 15 years.
    10             (ii)  Passenger buses, 12 years.
    11             (iii)  Furniture and equipment, 10 years.
    12             (iv)  All others, 30 years.
    13     (b)  Term of debt.--The maximum term of the debt authorized
    14  to be incurred under this act is 30 years.
    15  Section 17.  Appropriations.
    16     (a)  Public improvements.--The net proceeds of the sale of
    17  the obligations authorized in this act are hereby appropriated
    18  from the Capital Facilities Fund to the Department of General
    19  Services in the maximum amount of $1,152,466,000 $1,359,712,000   <--
    20  to be used by it exclusively to defray the financial cost of the
    21  public improvement projects specifically itemized in a capital
    22  budget. After reserving or paying the expenses of the sale of
    23  the obligation, the State Treasurer shall pay to the Department
    24  of General Services the moneys as required and certified by it
    25  to be legally due and payable.
    26     (b)  Furniture and equipment.--The net proceeds of the sale
    27  of the obligations authorized in this act are hereby
    28  appropriated from the Capital Facilities Fund to the Department
    29  of General Services in the maximum amount of $74,517,000          <--
    30  $91,517,000 to be used by it exclusively to defray the financial
    19990S0572B0686                 - 149 -

     1  cost of the public improvement projects consisting of the
     2  acquisition of original movable furniture and equipment
     3  specifically itemized in a capital budget. After reserving or
     4  paying the expenses of the sale of the obligation, the State
     5  Treasurer shall pay to the Department of General Services the
     6  moneys as required and certified by it to be legally due and
     7  payable.
     8     (c)  Transportation assistance.--The net proceeds of the sale
     9  of the obligations authorized in this act are hereby
    10  appropriated from the Capital Facilities Fund to the Department
    11  of Transportation in the maximum amount of $641,224,000           <--
    12  $695,894,000 to be used by it exclusively to defray the
    13  financial cost of the transportation assistance projects
    14  specifically itemized in a capital budget. After reserving or
    15  paying the expense of the sale of the obligation, the State
    16  Treasurer shall pay to the Department of Transportation the
    17  moneys as required and certified by it to be legally due and
    18  payable.
    19     (d)  Redevelopment assistance.--The net proceeds of the sale
    20  of the obligations authorized in this act are hereby
    21  appropriated from the Capital Facilities Fund to the Department
    22  of Community and Economic Development in the maximum amount of
    23  $1,934,500,000 $2,037,078,000 to be used by it exclusively to     <--
    24  defray the financial cost of the redevelopment assistance and
    25  redevelopment capital assistance projects specifically itemized
    26  in a capital budget. After reserving or paying the expenses of
    27  the sale of the obligation, the State Treasurer shall pay to the
    28  Department of Community and Economic Development the moneys as
    29  required and certified by it to be legally due and payable.
    30     (e)  Flood control.--The net proceeds of the sale of the
    19990S0572B0686                 - 150 -

     1  obligations authorized in this act are hereby appropriated from
     2  the Capital Facilities Fund to the Department of Environmental
     3  Protection in the maximum amount of $44,458,000 to be used by it
     4  exclusively to defray the financial cost of the flood control
     5  projects specifically itemized in a capital budget. After
     6  reserving or paying the expense of the sale of the obligation,
     7  the State Treasurer shall pay to the Department of Environmental
     8  Protection the moneys as required and certified by it to be
     9  legally due and payable.
    10  Section 18.  Federal funds.
    11     (a)  Projects itemized in this act.--In addition to those
    12  funds appropriated in section 17, all moneys received from the
    13  Federal Government for the projects specifically itemized in
    14  this act are also hereby appropriated for those projects.
    15     (b)  Projects not requiring itemization.--Department of
    16  Military and Veterans Affairs construction projects which are
    17  totally federally funded but which are to be administered by the
    18  Department of General Services are hereby authorized.
    19     (c)  Projects to be completed with Federal funds only.--
    20  Federal funds in the amount of $3,548,000 are authorized for the
    21  construction of an organization maintenance shop at Johnstown
    22  for the Department of Military and Veterans Affairs. Federal
    23  funds in the amount of $6,862,000 are authorized for the
    24  construction of an organization maintenance shop at Pittsburgh
    25  for the Department of Military and Veterans Affairs.
    26  Section 19.  Expiration of authorization and appropriation.
    27     (a)  General rule.--The authorization and appropriation for
    28  the additional capital projects itemized in sections 3, 4, 5, 6,
    29  7, 8, 9, 10, 11 and 12 for which construction contracts have not
    30  been executed within four years of the effective date of this
    19990S0572B0686                 - 151 -

     1  act shall expire upon such date and shall be considered
     2  repealed. The Secretary of the Budget may extend an expired
     3  project for up to one year upon written notification of the
     4  majority chairman and minority chairman of the Appropriations
     5  Committee of the Senate and the majority chairman and minority
     6  chairman of the Appropriations Committee of the House of
     7  Representatives. Upon expiration of the extension period, an
     8  extended project may not be subsequently extended.
     9     (b)  Reports.--Whenever the authorization and appropriation
    10  for the additional capital projects itemized under this act
    11  shall expire pursuant to subsection (a) or whenever the
    12  authorization and appropriation for the additional capital
    13  projects itemized under the act of October 10, 1997 (P.L.392,
    14  No.47), known as the Capital Budget Project Itemization Act of
    15  1996-1997, shall expire pursuant to section 20 of said act, the
    16  Secretary of the Budget shall, within 30 days of the date of
    17  expiration, provide to the majority and minority chairmen of the
    18  Appropriations Committee of the Senate and the majority and
    19  minority chairmen of the Appropriations Committee of the House
    20  of Representatives a report itemizing all capital projects which
    21  have expired. Such report shall contain specific references to
    22  the section of the act wherein the projects were itemized and
    23  shall include the project location, project description and
    24  authorized project amount. The report shall also aggregate the
    25  total dollar amount of expired projects by capital project
    26  category.
    27  Section 20.  Repeals.
    28     The following acts and parts of acts are repealed:
    29         (1)  Section 3(3)(i)(A) of the act of July 2, 1993
    30     (P.L.265, No.47), known as the Capital Budget Project
    19990S0572B0686                 - 152 -

     1     Itemization Act for 1993-1994.
     2         (2)  Section 5(b)(6)(i)(A) SECTIONS 5(B)(6)(I)(A) AND      <--
     3     6(29)(II)(A) of the act of July 8, 1994 (P.L.444, No.74),
     4     known as the Capital Budget Project Itemization Act for 1994-
     5     1995.
     6         (3)  Section SECTIONS 6(2)(iii)(F) and (H), (15)(ii)(A),   <--
     7     (B) and (C) and (36)(i) AND 8(1)(XIV)(A) of the act of         <--
     8     October 10, 1997 (P.L.392, No.47), known as the Capital
     9     Budget Project Itemization Act for 1996-1997.
    10  Section 21.  Editorial changes.
    11     In editing and preparing this act for printing following the
    12  final enactment, the Legislative Reference Bureau shall insert
    13  or revise letters or numbers for projects where the letters or
    14  numbers are missing or require revision. The bureau shall also
    15  revise the total monetary amounts for the total authorization,
    16  debt authorization, appropriations and departmental totals as
    17  necessary to agree with the total monetary amounts of the
    18  projects.
    19  Section 22.  Effective date.
    20     This act shall take effect immediately.







    C9L86RZ/19990S0572B0686         - 153 -