PRIOR PRINTER'S NOS. 3280, 3294 PRINTER'S NO. 3325
No. 2317 Session of 2005
INTRODUCED BY FEESE, DECEMBER 7, 2005
AS AMENDED ON THIRD CONSIDERATION, HOUSE OF REPRESENTATIVES, DECEMBER 14, 2005
AN ACT 1 Providing for the capital budget for the fiscal year 2005-2006; 2 itemizing public improvement projects, furniture and 3 equipment projects, transportation assistance projects, 4 redevelopment assistance capital projects, flood control 5 projects, Keystone Recreation, Park and Conservation Fund 6 projects, Environmental Stewardship Fund projects and Motor 7 License Fund projects to be constructed or acquired or 8 assisted by the Department of General Services, the 9 Department of Community and Economic Development, the 10 Department of Conservation and Natural Resources, the 11 Department of Environmental Protection and the Department of 12 Transportation, together with their estimated financial 13 costs; authorizing the incurring of debt without the approval 14 of the electors for the purpose of financing the projects to 15 be constructed, acquired or assisted by the Department of 16 General Services; stating the estimated useful life of the 17 projects; providing an exemption; and making appropriations. 18 The General Assembly of the Commonwealth of Pennsylvania 19 hereby enacts as follows: 20 Section 1. Short title. 21 This act shall be known and may be cited as the Capital 22 Budget Project Itemization Act of 2005-2006. 23 Section 2. Total authorizations. 24 (a) Public improvements.--The total authorization for the
1 additional capital projects in the category of public 2 improvement projects itemized in section 3 and to be acquired or 3 constructed by the Department of General Services, its 4 successors or assigns and to be financed by the incurring of 5 debt shall be $924,546,000 $1,603,646,000. <-- 6 (b) Furniture and equipment.--The total authorization for 7 the additional capital projects in the category of public 8 improvement projects consisting of the acquisition of original 9 movable furniture and equipment to complete public improvement 10 projects itemized in section 4 and to be acquired by the 11 Department of General Services, its successors or assigns and to 12 be financed by the incurring of debt shall be $41,186,000. 13 (c) Transportation assistance.--The total authorization for 14 the capital projects in the category of transportation 15 assistance projects itemized in section 5 with respect to which 16 an interest is to be acquired in or constructed by the 17 Department of Transportation, its successors or assigns and to 18 be financed by the incurring of debt shall be $968,799,000 <-- 19 $1,067,426,000. <-- 20 (d) Redevelopment assistance.--The total authorization for 21 the additional capital projects in the category of redevelopment 22 assistance and redevelopment assistance capital projects 23 itemized in section 6 for capital grants by the Department of 24 Community and Economic Development, its successors or assigns, 25 and to be financed by the incurring of debt shall be 26 $1,977,410,000 $2,092,860,000. <-- 27 (e) Flood control.--The total authorization for the capital 28 projects in the category of flood control projects itemized in 29 section 7 and to be constructed by the Department of 30 Environmental Protection, its successors or assigns, and to be 20050H2317B3325 - 2 -
1 financed by the incurring of debt, shall be $43,250,000. 2 (f) Keystone Recreation, Park and Conservation Fund.--The 3 total authorization for the capital projects in the category of 4 public improvement projects itemized in section 8 and to be 5 constructed by the Department of Conservation and Natural 6 Resources, its successors or assigns and to be financed from 7 current revenues in the Keystone Recreation, Park and 8 Conservation Fund shall be $16,400,000. 9 (g) Environmental Stewardship Fund projects.--The total 10 authorization for the capital projects in the category of public 11 improvement projects itemized in section 9 and to be constructed 12 by the Department of Conservation and Natural Resources, its 13 successors or assigns and to be financed from current revenues 14 in the Environmental Stewardship Fund shall be $15,000,000. 15 (h) Motor License Fund projects.--The total authorization 16 for the capital projects in the category of public improvement 17 projects itemized in section 10 and to be developed by the 18 Department of General Services, its successors or assigns, for 19 the Department of Transportation, and to be financed by the 20 incurring of debt or from current revenues in the Motor License 21 Fund is $66,125,000. 22 (i) State forestry bridge projects.--The total authorization 23 for the capital projects itemized in section 11 to be 24 constructed by the Department of Conservation and Natural 25 Resources, its successors or assigns and to be financed by oil 26 company franchise tax revenues pursuant to 75 Pa.C.S. § 27 9502(a)(2)(iv) (relating to imposition of tax) shall be 28 $5,100,000. 29 Section 3. Itemization of public improvement capital projects. 30 Additional capital projects in the category of public 20050H2317B3325 - 3 -
1 improvement projects to be constructed or acquired by the 2 Department of General Services, its successors or assigns, and 3 to be financed by the incurring of debt, are hereby itemized, 4 together with their respective estimated financial costs, as 5 follows: 6 Total 7 Project 8 Project Allocation 9 (1) Office of Administration 10 (i) Statewide mobile radio and microwave 11 system 12 (A) Additional funds for DGS project 590- 13 10, Statewide mobile radio and 14 microwave system 15,000,000 15 (2) Capitol Preservation Committee 16 (i) Flag preservation facility 17 (A) Construction of a flag preservation 18 facility 1,500,000 19 (3) Department of Community and Economic 20 Development 21 (i) Philadelphia Regional Port Authority 22 (A) Reinforce outside crane area, 23 additional inside crane capacity and 24 enhancements to grand block building at 25 Aker American Shipyard in Philadelphia 2,000,000 26 (B) Renovate material receiving facility 27 at Aker American Shipyard in 28 Philadelphia 3,500,000 29 (C) Renovations and reconstruction of 30 administrative and operational support 20050H2317B3325 - 4 -
1 building at Aker American Shipyard in 2 Philadelphia 8,000,000 3 (4) Department of Conservation and Natural 4 Resources 5 (i) Bald Eagle State Park 6 (A) Construct family campground, Phase 2 2,000,000 7 (Base Project Allocation - $2,000,000) 8 (ii) Colonial Plantation 9 (A) Capital improvements, including 10 repair, replacement and restoration to 11 buildings 526,000 12 (iii) Forest District 12 13 (A) Relocate road 1,000,000 14 (Base Project Allocation - $850,000) 15 (Design and Contingencies - $150,000) 16 (iv) Gouldsboro State Park 17 (A) Rehabilitation of dam 2,000,000 18 (Base Project Allocation - $1,667,000) 19 (Design and Contingencies - $333,000) 20 (v) Laurel Ridge State Park 21 (A) Replace pedestrian bridge over the 22 Pennsylvania Turnpike 3,500,000 23 (Base Project Allocation - $2,916,000) 24 (Design and Contingencies - $584,000) 25 (vi) Nockamixon State Park 26 (A) Improvements to park 15,000,000 27 (vii) S. B. Elliott State Park 28 (A) Complete visitors center and overnight 29 lodge facility 8,000,000 30 (Base Project Allocation - $6,666,000) 20050H2317B3325 - 5 -
1 (Design and Contingencies - $1,334,000) 2 (B) Design, fabricate and install exhibits 3 at the Visitors Gateway Center to the 4 PA WILDS 2,000,000 5 (Base Project Allocation - $1,750,000) 6 (Design and Contingencies - $250,000) 7 (viii) Shikellamy State Park 8 (A) Repair and replace marina facilities 9 that were partly destroyed or seriously 10 damaged during Hurricane Ivan in 11 September 2004 and will include head 12 walls, docks, ramps, anchors, walkways, 13 railings and support facilities. 14 Replacement facility to be constructed 15 in such a manner to lessen threats of 16 future flood damage 2,500,000 17 (Base Project Allocation - $2,083,000) 18 (Design and Contingencies - $417,000) 19 (B) RENOVATION OF THE MARINA 1,000,000 <-- 20 (C) MARINA REPLACEMENT, INCLUDING 21 CONSTRUCTION AND OTHER RELATED COSTS 1,000,000 22 (ix) Elk County 23 (A) Construction and related costs of the 24 Elk Visitors Center in Pennsylvania 25 Wilds in Benezette 5,000,000 26 (X) ERIE COUNTY <-- 27 (A) CONSTRUCTION, INFRASTRUCTURE AND OTHER 28 RELATED COSTS FOR THE DEVELOPMENT OF 29 THE WARNER THEATER 15,000,000 30 (XI) WASHINGTON CROSSING PARK 20050H2317B3325 - 6 -
1 (A) STREAMBANK RESTORATION, RECONSTRUCTION 2 OF A BRIDGE AND OTHER CAPITAL 3 IMPROVEMENTS 4,000,000 4 (XII) MILTON STATE PARK 5 (A) CAPITAL IMPROVEMENTS 1,000,000 6 (5) Department of Corrections 7 (i) State Correctional Institution at Dallas 8 (A) Remove sanitary and storm drains cross 9 connections and upgrade plant 10 infrastructure and processing 11 equipment 3,600,000 12 (Base Project Allocation - $2,880,000) 13 (Design and Contingencies - $720,000) 14 (ii) State Correctional Institution at 15 Graterford 16 (A) Continue upgrading plumbing fixtures 17 at various cell blocks and replace 18 existing radiators 9,000,000 19 (Base Project Allocation - $7,200,000) 20 (Design and Contingencies - $1,800,000) 21 (B) Continue security upgrades with new 22 cell doors and locks, HVAC to control 23 rooms and new fan coils 6,000,000 24 (Base Project Allocation - $4,800,000) 25 (Design and Contingencies - $1,200,000) 26 (iii) State Correctional Institution at Greene 27 (A) Renovate fire alarm system to replace 28 and modernize heat sensors, smoke 29 detectors, pull stations and computer 30 programming to current codes and 20050H2317B3325 - 7 -
1 technology 900,000 2 (Base Project Allocation - $720,000) 3 (Design and Contingencies - $180,000) 4 (iv) State Correctional Institution at 5 Houtzdale 6 (A) Renovate fire alarm system to replace 7 and modernize heat sensors, smoke 8 detectors, pull stations and computer 9 programming to current codes and 10 technology 900,000 11 (Base Project Allocation - $720,000) 12 (Design and Contingencies - $180,000) 13 (v) State Correctional Institution at Rockview 14 (A) Modify Benner Spring Pump Station to 15 include a packaged water filtration 16 system 1,000,000 17 (Base Project Allocation - $800,000) 18 (Design and Contingencies - $200,000) 19 (vi) State Correctional Institution at 20 Somerset 21 (A) Renovate fire alarm system to replace 22 and modernize heat sensors, smoke 23 detectors, pull stations and computer 24 programming to current codes and 25 technology 900,000 26 (Base Project Allocation - $720,000) 27 (Design and Contingencies - $180,000) 28 (vii) State Correctional Institution at 29 Waymart 30 (A) Life Safety Code improvements, 20050H2317B3325 - 8 -
1 installation of fire alarms, emergency 2 lighting, zone fire doors and 3 networking of improvements into 4 existing system in Housing Units A2, F, 5 G, H, I, J and O 4,300,000 6 (Base Project Allocation - $3,440,000) 7 (Design and Contingencies - $860,000) 8 (6) Department of Education 9 (i) Bloomsburg University 10 (A) Renovation of Bakeless Center for 11 Humanities, including construction 5,000,000 12 (ii) California University of Pennsylvania 13 (A) Renovation of Old Main and South Hall 12,500,000 14 (iii) Cheyney University 15 (A) Renovation of Browne Hall 4,500,000 16 (iv) Clarion University 17 (A) Renovation of Becht Hall 4,500,000 18 (B) Renovation and replacement of Koehler 19 Fieldhouse and Natatorium 20,000,000 20 (v) Community College of Allegheny County 21 (A) Renovation of Logan School, including 22 construction, abatement of hazardous 23 materials and infrastructure, for 24 redevelopment as a community college 25 facility 3,500,000 26 (vi) East Stroudsburg University 27 (A) Construction of Science and Technology 28 Center 2,000,000 29 (vii) Edinboro University 30 (A) Construction of new maintenance 20050H2317B3325 - 9 -
1 building 9,600,000 2 (B) Renovation of Hendricks Hall 14,000,000 3 (viii) Kutztown University 4 (A) Upgrade of maintenance building 2,000,000 5 (B) Expansion and renovation of Schaeffer 6 Auditorium 5,000,000 7 (ix) Harrisburg Area Community College 8 (A) Renovation of the Evans Physical 9 Education Center, construction of 10 addition to the McCormick Library, 11 renovation and expansion of the 12 Community Center for Technology Arts 13 Building and acquisition of a facility 14 for administrative and technical 15 services 25,000,000 16 (x) Lincoln University 17 (A) Campus and grounds renovation 13,000,000 18 (Base Project Allocation - $10,400,000) 19 (Design and Contingencies - $2,600,000) 20 (xi) Lock Haven University 21 (A) Renovation and construction of a 22 science and math center at East Campus 21,000,000 23 (xii) Mansfield University 24 (A) Renovation of Decker Gym 8,000,000 25 (xiii) Montgomery County 26 (A) Acquisition of land and construction 27 of a new secondary school 9,500,000 28 (xiv) Northampton County Area Community 29 College 30 (A) Expansion including acquisition, 20050H2317B3325 - 10 -
1 construction and related 2 infrastructure 2,000,000 3 (xv) Pennsylvania College of Technology 4 (A) Construction of the Center for 5 Business and Workforce Development 1,000,000 6 (xvi) The Pennsylvania State University 7 (A) Additional funding for new classroom 8 building at Berks Campus 6,700,000 9 (Base Project Allocation - $5,360,000) 10 (Design and Contingencies - $1,340,000) 11 (B) Additional funding for new 12 administration building at Delaware 13 Campus 1,400,000 14 (Base Project Allocation - $1,120,000) 15 (Design and Contingencies - $280,000) 16 (C) Expansion and/or construction of 17 medical facilities, Hershey Medical 18 Center 29,000,000 19 (D) Construction of new classroom 20 laboratory building at the Berks 21 Campus 19,500,000 22 (E) Construction of new administration 23 building at the Delaware County Campus 8,200,000 24 (F) Expansion of the Henderson Building at 25 the University Park Campus, including 26 construction 34,500,000 27 (G) Expansion of the More Building, 28 including construction at the 29 University Park Campus 38,200,000 30 (H) Construction, infrastructure and other 20050H2317B3325 - 11 -
1 related costs for the establishment of 2 the Animal Health Laboratory for 3 Western Pennsylvania, PADLS system, 4 Fayette Campus 10,000,000 5 (xvii) University of Pittsburgh 6 (A) Construct recreation and athletic 7 complex 18,000,000 8 (Base Project Allocation - $11,250,000) 9 (Land Allocation - $4,500,000) 10 (Design and Contingencies - $2,250,000) 11 (B) Renovations and infrastructure 12 upgrades to Parran and Crabtree Halls 5,520,000 13 (C) Renovations and infrastructure 14 upgrades to Benedum Hall 5,700,000 15 (D) Midcampus research complex renovation 16 project 42,000,000 17 (Base Project Allocation - $37,800,000) 18 (Design and Contingencies - $4,200,000) 19 (E) Salk Hall addition 5,925,000 20 (xviii) University of Pittsburgh Medical 21 Center 22 (A) Acquisition of land, demolition and 23 construction of a multifaceted 24 biomedical research facility to conduct 25 basic research programs, basic cancer 26 research programs, as well as 27 translational and clinical research 20,000,000 28 (xix) Scranton School for the Deaf 29 (A) Life safety, health and security 30 upgrades 7,878,000 20050H2317B3325 - 12 -
1 (Base Project Allocation - $6,850,000) 2 (Design and Contingencies - $1,028,000) 3 (xx) Shippensburg University 4 (A) Renovation of Henderson Hall 13,500,000 5 (B) Renovation of campus steam plant 6,000,000 6 (C) Renovation of steam distribution 7 system 2,000,000 8 (D) Renovation of Huber Arts Center 1,500,000 9 (xxi) Slippery Rock University 10 (A) Construction of a performing arts 11 center 30,000,000 12 (xxii) Thaddeus Stevens College of Technology 13 (A) Construct new vocational education 14 building 2,500,000 15 (Base Project Allocation - $2,200,000) 16 (Design and Contingencies - $300,000) 17 (B) Construction and related costs for 18 renovations and improvements to campus 19 facilities and infrastructure 5,000,000 20 (C) Construction, infrastructure and other 21 related costs to enhance facilities at 22 the college 4,000,000 23 (xxiii) University of Pennsylvania 24 (A) Expansion of the Morris Arboretum 12,000,000 25 (XXIV) TEMPLE UNIVERSITY <-- 26 (A) RESTORATION OF THE HISTORIC BAPTIST 27 TEMPLE. THIS PROJECT SHALL BE CONSTRUED 28 AS A SUPPLEMENT TO THE PROJECT 29 AUTHORIZED IN SECTION 3(5)(VI)(N) OF 30 THE ACT OF OCTOBER 30, 2002 (P.L.891, 20050H2317B3325 - 13 -
1 NO.131), KNOWN AS THE CAPITAL BUDGET 2 PROJECT ITEMIZATION ACT OF 2001-2002, 3 IN THE AMOUNT OF $22,045,000 AND ALSO 4 AS A SUPPLEMENT TO THE PROJECT 5 AUTHORIZED IN SECTION 3(5)(VII)(K) OF 6 THE ACT OF JUNE 22, 2004 (P.L.257, 7 NO.40), KNOWN AS THE CAPITAL BUDGET 8 PROJECT ITEMIZATION ACT OF 2003-2004 IN 9 THE AMOUNT OF $2,011,000 5,000,000 10 (B) RENOVATION OF RESEARCH FACILITIES, 11 BARTON HALL. THIS PROJECT SHALL BE 12 CONSTRUED AS A SUPPLEMENT TO THE 13 PROJECT AUTHORIZED IN SECTION 14 3(5)(VI)(M) OF THE ACT OF OCTOBER 30, 15 2002 (P.L.891, NO.131), KNOWN AS THE 16 CAPITAL BUDGET PROJECT ITEMIZATION ACT 17 OF 2001-2002, IN THE AMOUNT OF 18 $10,160,000 AND ALSO AS A SUPPLEMENT TO 19 THE PROJECT AUTHORIZED IN SECTION 20 4(3)(IV)(A) OF THE ACT OF JUNE 22, 2000 21 (P.L.136, NO.27), KNOWN AS THE CAPITAL 22 BUDGET DEBT AUTHORIZATION PROJECT 23 ITEMIZATION ACT OF 2000-2001 IN THE 24 AMOUNT OF $6,800,000 25,000,000 25 (C) ADDITION TO PRESSER HALL FOR SCHOOL OF 26 MUSIC. THIS PROJECT SHALL BE CONSTRUED 27 AS A SUPPLEMENT TO THE PROJECT 28 AUTHORIZED IN SECTION 3(5)(VII)(H) OF 29 THE ACT OF JUNE 22, 2004 (P.L.257, 30 NO.40), KNOWN AS THE CAPITAL BUDGET 20050H2317B3325 - 14 -
1 PROJECT ITEMIZATION ACT OF 2003-2004, 2 IN THE AMOUNT OF $5,688,000 6,000,000 3 (D) RESEARCH, LABORATORY AND OFFICE 4 BUILDING ON MAIN CAMPUS 50,000,000 5 (XXV) STATE LIBRARY 6 (A) CONSTRUCTION OF THE RARE BOOK FACILITY 7 IN THE STATE LIBRARY 10,000,000 8 (7) Emergency Management Agency 9 (i) Rehabilitate and renovate emergency 10 operations center 2,000,000 11 (Base Project Allocation - $1,600,000) 12 (Design and Contingencies - $400,000) 13 (8) Department of Environmental Protection 14 (i) Allegheny County 15 (A) Additional funds for DGS project 184- 16 33, concrete channel system along Dirty 17 Camp Run 2,400,000 18 (Base Project Allocation - $2,000,000) 19 (Design and Contingencies - $400,000) 20 (B) Etna flood protection project 864,000 21 (Base Project Allocation - $720,000) 22 (Design and Contingencies - $144,000) 23 (ii) Beaver County 24 (A) Connoquenessing Creek flood mitigation 25 project 2,000,000 26 (iii) Berks County 27 (A) Demolition and removal of Felix Dam 600,000 28 (Base Project Allocation - $500,000) 29 (Design and Contingencies - $100,000) 30 (iv) Clarion County 20050H2317B3325 - 15 -
1 (A) New Bethlehem Federal flood control 2 project 570,000 3 (Base Project Allocation - $570,000) 4 (v) Clearfield County 5 (A) DuBois Federal flood control project 1,290,000 6 (Base Project Allocation - $1,290,000) 7 (vi) Crawford County 8 (A) Additional funds for DGS project 183- 9 16, compacted concrete detention dam on 10 Church Run upstream of Titusville 600,000 11 (Base Project Allocation - $500,000) 12 (Design and Contingencies - $100,000) 13 (vii) Dauphin County 14 (A) Renovation of technology 15 infrastructure within the Rachel Carson 16 State Office Building 5,000,000 17 (Base Project Allocation - $5,000,000) 18 (B) Construction, infrastructure and other 19 related costs for the Wildwood Lake 20 Flood Control Project 600,000 21 (viii) Delaware County 22 (A) Construction of shields to secure, 23 stabilize and protect six exposed 24 sanitary sewer pipes along Darby and 25 Crum Creeks and their tributaries 750,000 26 (ix) Elk County 27 (A) Acquisition, construction and 28 infrastructure improvements related to 29 the Clarion River flood prevention in 30 Ridgway Borough and Ridgway Township 7,500,000 20050H2317B3325 - 16 -
1 (x) Fayette County 2 (A) Connellsville Federal flood control 3 project 450,000 4 (Base Project Allocation - $450,000) 5 (xi) Lackawanna County 6 (A) Blakely flood protection project 600,000 7 (Base Project Allocation - $500,000) 8 (Design and Contingencies - $100,000) 9 (xii) Lehigh County 10 (A) Construction of flood mitigation for 11 Spring Creek, Swabin Creek and the 12 Little Lehigh Creek within the Little 13 Lehigh Creek Watershed 10,000,000 14 (xiii) Luzerne County 15 (A) Coal Street flood control project 1,000,000 16 (xiv) Monroe County 17 (A) Acquisition, construction, 18 infrastructure and related costs for 19 flood control and related improvements 20 to Brushy Mountain area along Route 447 21 in Stroud Township 500,000 22 (B) Acquisition, construction, 23 infrastructure and other related costs 24 to rehabilitate Brushy Mountain area 25 along Route 447 in Stroud Township 500,000 26 (xv) Montgomery County 27 (A) Construction, infrastructure and other 28 related costs for Tookany Creek 29 stabilization and flood control 30 project 1,000,000 20050H2317B3325 - 17 -
1 (xvi) Montour County 2 (A) Additional funds for DGS project 181- 3 05, channel improvements including 4 replacement of Route 11 bridge and 5 railroad bridge with box culvert 2,400,000 6 (Base Project Allocation - $2,000,000) 7 (Design and Contingencies - $400,000) 8 (xvii) Warren County 9 (A) Jackson Run flood mitigation 500,000 10 (9) Pennsylvania Fish and Boat Commission 11 (i) Centre County 12 (A) Construction of dam in the vicinity of 13 Colyer Lake in Potter Township 2,500,000 14 (II) ADAM BOWER DAM <-- 15 (A) REHABILITATION OF DAM 8,000,000 16 (III) SHIKELLAMY STATE PARK 17 (A) CONSTRUCTION OF A FISH PASSAGEWAY 12,600,000 18 (10) Department of General Services 19 (i) Philadelphia County 20 (A) Construction, infrastructure and other 21 related costs to modernize a publicly 22 owned natural gas utilities system in 23 cities of the first class 200,000,000 24 (11) Department of Military and Veterans Affairs 25 (i) Pennsylvania National Guard Readiness 26 Center, Mercer County 27 (A) Additional funds for construction and 28 land acquisition to replace the 29 existing National Guard Armory, City of 30 Hermitage, Pennsylvania 952,000 20050H2317B3325 - 18 -
1 (Base Project Allocation - $553,000) 2 (Land Allocation - $325,000) 3 (Design and Contingencies - $74,000) 4 (ii) Combined Readiness Center, York County 5 (A) Additional funds for construction of 6 combined readiness center 676,000 7 (Base Project Allocation - $521,000) 8 (Design and Contingencies - $155,000) 9 (12) Pennsylvania Historical and Museum 10 Commission 11 (i) Brandywine Battlefield 12 (A) Provide permanent exhibits for 13 visitors center 1,200,000 14 (Base Project Allocation - $1,000,000) 15 (Design and Contingencies - $200,000) 16 (ii) Potter County 17 (A) PA Lumber Museum, expansion and 18 construction of the main museum 19 building 2,000,000 20 (13) Department of Public Welfare 21 (i) Allentown State Hospital 22 (A) Renovate boiler plant 600,000 23 (Base Project Allocation - $500,000) 24 (Design and Contingencies - $100,000) 25 (ii) Danville State Hospital 26 (A) Replace electrical switch gear in each 27 building 990,000 28 (Base Project Allocation - $825,000) 29 (Design and Contingencies - $165,000) 30 (iii) Ebensburg Center 20050H2317B3325 - 19 -
1 (A) Upgrade infrastructure for JFK 2 Learning Center and Memorial Hall 1,740,000 3 (Base Project Allocation - $1,450,000) 4 (Design and Contingencies - $290,000) 5 (iv) Hamburg Center 6 (A) Replace water distribution center 1,200,000 7 (Base Project Allocation - $1,000,000) 8 (Design and Contingencies - $200,000) 9 (v) Mayview State Hospital 10 (A) Renovate water distribution system to 11 all buildings 2,400,000 12 (Base Project Allocation - $2,000,000) 13 (Design and Contingencies - $400,000) 14 (vi) Norristown State Hospital 15 (A) Renovate boiler plant 1,800,000 16 (Base Project Allocation - $1,500,000) 17 (Design and Contingencies - $300,000) 18 (vii) Pennhurst State Mental Hospital 19 (A) Demolition and removal of buildings 20 for abatement of hazardous materials 11,000,000 21 (viii) Polk Center 22 (A) Renovate storm drains 1,200,000 23 (Base Project Allocation - $1,000,000) 24 (Design and Contingencies - $200,000) 25 (B) Dredge lake 840,000 26 (Base Project Allocation - $700,000) 27 (Design and Contingencies - $140,000) 28 (ix) South Mountain Restoration Center 29 (A) Renovate HVAC system in building 7 3,720,000 30 (Base Project Allocation - $3,100,000) 20050H2317B3325 - 20 -
1 (Design and Contingencies - $620,000) 2 (x) Torrance State Hospital 3 (A) Install new gas boiler 2,640,000 4 (Base Project Allocation - $2,200,000) 5 (Design and Contingencies - $440,000) 6 (B) Renovate HVAC system to the remainder 7 of the Wiseman Building along with 8 upgrading fire alarm system to meet 9 compliance 2,160,000 10 (Base Project Allocation - $1,800,000) 11 (Design and Contingencies - $360,000) 12 (xi) Warren State Hospital 13 (A) Upgrade electrical system 960,000 14 (Base Project Allocation - $800,000) 15 (Design and Contingencies - $160,000) 16 (xii) Wernersville State Hospital 17 (A) Repair sewer distribution piping 1,200,000 18 (Base Project Allocation - $1,000,000) 19 (Design and Contingencies - $200,000) 20 (xiii) White Haven Center 21 (A) Install emergency generators 1,080,000 22 (Base Project Allocation - $900,000) 23 (Design and Contingencies - $180,000) 24 (B) Install new roofs on the Hickory, 25 Penn, Pine, Laurel, Parc and Haven 26 Buildings 1,200,000 27 (Base Project Allocation - $1,000,000) 28 (Design and Contingencies - $200,000) 29 (xiv) YDC/YFC System, Statewide 30 (A) Install Shatterguard protective 20050H2317B3325 - 21 -
1 coating on windows through the YDC/YFC 2 system 615,000 3 (Base Project Allocation - $513,000) 4 (Design and Contingencies - $102,000) 5 (14) State System of Higher Education 6 (i) Lock Haven University 7 (A) Construction, infrastructure and other 8 related costs for a wrestling, training 9 and hall of fame center 2,000,000 10 (15) Department of Transportation 11 (i) Riverfront Office Center 12 (A) Purchase Riverfront Office Center 13 building 30,000,000 14 (Base Project Allocation - $30,000,000) 15 (ii) Clearfield County Welcome Center 16 (A) Construct New Wilds Gateway Welcome 17 Center 6,500,000 18 (Base Project Allocation - $6,500,000) 19 (iii) Safety rest area 20 (A) Construct safety rest area in Warren, 21 McKean, Potter or Tioga County 6,500,000 22 (Base Project Allocation - $6,500,000) 23 (B) Construct safety rest area in Clinton 24 County 6,500,000 25 (Base Project Allocation - $6,500,000) 26 (IV) US ROUTE 219 WELCOME CENTER <-- 27 (A) CONSTRUCTION OF WELCOME CENTER 8,000,000 28 (16) PHILADELPHIA REGIONAL PORT AUTHORITY 29 (A) MARGINALIZE BERTH AND CONSTRUCTION OF 30 750,000 SQUARE FEET OF WAREHOUSE SPACE 20050H2317B3325 - 22 -
1 FOR FOREST PRODUCTS 80,000,000 2 (B) DEVELOPMENT OF FORMER PUBLICKER SITE 3 FOR A 75-ACRE TERMINAL AND BERTH 4 EXPANSION 80,000,000 5 (C) ACQUISITION OF LAND AND CONSTRUCTION 6 OF A WAREHOUSE FOR FOREST PRODUCTS 12,000,000 7 (D) CONSTRUCTION OF ADDITIONAL FACILITIES 8 FOR COCOA BEAN STORAGE AND RELATED 9 COSTS 14,000,000 10 (E) EXPANSION OF THE PORT FACILITIES TO 11 INCLUDE PIERS 122, 124 AND EAST END OF 12 NAVY YARD, INCLUDING CONSTRUCTION AND 13 OTHER RELATED COSTS 240,000,000 14 (F) CONSTRUCTION OF AN 80,000 SQUARE FOOT 15 WAREHOUSE, INCLUDING RELATED COSTS 100,000,000 16 (G) CONSTRUCTION OF RAIL SPUR FOR PORT 17 ACTIVITIES 3,000,000 18 (H) CAPITAL IMPROVEMENT TO TIOGA MARINE 19 TERMINAL FRAME SUPPORTED BUILDING 1,500,000 20 (17) PHILADELPHIA COUNTY 21 (I) AKER PHILADELPHIA SHIPYARD 22 (A) REINFORCEMENT OF OUTSIDE CRANE AREA, 23 INSIDE CRANE CAPACITY AND ENHANCEMENT 24 TO GRAND BLOCK BUILDING 2,000,000 25 Section 4. Itemization of furniture and equipment 26 projects. 27 Additional capital projects in the category of 28 public improvement projects consisting of the 29 acquisition of movable furniture and equipment to 30 complete public improvement projects and to be 20050H2317B3325 - 23 -
1 purchased by the Department of General Services, 2 its successors or assigns and to be financed by 3 the incurring of debt are hereby itemized, 4 together with their respective estimated financial 5 costs, as follows: 6 Total 7 Project 8 Project Allocation 9 (1) Office of Administration 10 (i) Statewide mobile radio and microwave 11 system 12 (A) Additional funds for DGS project 590- 13 10, Statewide mobile radio and 14 microwave system 1,500,000 15 (2) Department of Conservation and Natural 16 Resources 17 (i) Benjamin Rush State Park 18 (A) Original furniture and equipment for 19 current capital projects 217,000 20 (ii) Cook Forest State Park 21 (A) Original furniture and equipment for 22 current capital projects 114,000 23 (iii) Delaware Canal State Park 24 (A) Original furniture and equipment for 25 current capital projects 200,000 26 (iv) Nescopeck State Park 27 (A) Original furniture and equipment for 28 current capital projects 150,000 29 (v) Pine Grove Furnace State Park 30 (A) Original furniture and equipment for 20050H2317B3325 - 24 -
1 current capital projects 200,000 2 (vi) Presque Isle State Park 3 (A) Original furniture and equipment for 4 current capital projects 400,000 5 (vii) S.B. Elliott State Park 6 (A) Original furnishings and equipment for 7 overnight lodge at Visitors Gateway 8 Center to the Pennsylvania Wilds 1,500,000 9 (B) Furniture and equipment and related 10 costs for the Pennsylvania Wilds 11 Visitors Gateway 3,500,000 12 (C) Furnishings and equipment for Gateway 13 Inn 4,000,000 14 (viii) Elk County 15 (A) Purchase of furniture and equipment 16 for the Elk Visitors Center in 17 Pennsylvania Wilds in Benezette 1,000,000 18 (3) Department of Education 19 (i) Bloomsburg University 20 (A) Original furniture and equipment for 21 Bakeless Center renovation 500,000 22 (ii) Clarion University 23 (A) Original furniture and equipment for 24 Becht Hall renovation 500,000 25 (iii) Cheyney University 26 (A) Original furniture and equipment for 27 Browne Hall renovation 500,000 28 (iv) Edinboro University 29 (A) Original furniture and equipment for 30 Hendricks Hall renovation 1,400,000 20050H2317B3325 - 25 -
1 (B) Original furniture and equipment for
2 new maintenance building 1,000,000
3 (v) Kutztown University
4 (A) Original furniture and equipment for
5 maintenance building upgrade and garage
6 demolition 400,000
7 (B) Original furniture and equipment for
8 expansion and renovation of Schaeffer
9 Auditorium 500,000
10 (vi) Lock Haven University
11 (A) Original furniture and equipment for
12 Science and Math Center 2,100,000
13 (vii) The Pennsylvania State University
14 (A) Original furniture and equipment for
15 new classroom building at Berks Campus 1,090,000
16 (B) Original furniture and equipment for
17 the Classroom Laboratory Building at
18 the Berks Campus 1,500,000
19 (C) Original furniture and equipment for
20 the Material Sciences Building at the
21 University Park Campus 8,600,000
22 (D) Original furniture and equipment for
23 the Moore MORE Building at the <--
24 University Park Campus 3,800,000
25 (E) Original furniture and equipment for
26 the Administration and Classroom
27 Building at the Delaware County Campus 800,000
28 (viii) University of Pittsburgh
29 (A) Renovations and infrastructure
30 upgrades to Benedum Hall 38,000
20050H2317B3325 - 26 -
1 (B) Upgrade and deferred maintenance of 2 Chevron Science Center 8,000 3 (C) Renovations and infrastructure 4 upgrades to Parran and Crabtree Halls 37,000 5 (D) Addition to Salk Hall 40,000 6 (E) Renovation of Midcampus Research 7 Complex 42,000 8 (ix) Clearfield County Career and Technical 9 Center 10 (A) Equipment for use in building and 11 construction, transportation and 12 logistics, manufacturing and 13 communications services training 14 programs 200,000 15 (4) Pennsylvania Historical and Museum Commission 16 (i) Brandywine Battlefield 17 (A) Original furniture and equipment for 18 expansion of visitors center 420,000 19 (ii) Pennsylvania Military Museum 20 (A) Original furniture and equipment for 21 renovation of museum 270,000 22 (iii) Railroad Museum of Pennsylvania 23 (A) Original furniture and equipment for 24 renovation and expansion of museum 660,000 25 (iv) Slippery Rock University 26 (A) Original furniture and equipment for 27 performing arts center 3,000,000 28 (5) State System of Higher Education 29 (i) Lock Haven University 30 (A) Equipment and furniture for classrooms 20050H2317B3325 - 27 -
1 and laboratories for medical arts and 2 engineering programs at the Lock Haven 3 University Clearfield Campus 1,000,000 4 Section 5. Itemization of transportation assistance projects. 5 (a) Mass transit.--Additional capital projects in the 6 category of transportation assistance projects for mass transit 7 in which an interest is to be acquired or constructed by the 8 Department of Transportation, its successors or assigns and to 9 be financed by the incurring of debt are hereby itemized, 10 together with their estimated financial costs, as follows: 11 Total 12 Project 13 Project Allocation 14 (1) Berks and Reading Transit Authority 15 (i) Replace two fixed-route buses 100,000 16 (Base Project Allocation - $90,000) 17 (Design and Contingencies -$10,000) 18 (ii) Replace eight paratransit buses 147,000 19 (Base Project Allocation - $132,000) 20 (Design and Contingencies - $15,000) 21 (iii) Purchase auto vehicle locator system 167,000 22 (Base Project Allocation - $150,000) 23 (Design and Contingencies - $17,000) 24 (2) Blair County 25 (i) Altoona - Bellwood, construction of 26 trolley line from Altoona to Bellwood 1,800,000 27 (2.1) AMTRAN <-- 28 (ii) (I) Capital upgrades related to <-- 29 technology 276,000 30 (iii) (II) Replacement of vehicles, purchase <-- 20050H2317B3325 - 28 -
1 of tools and equipment and upgrade of 2 operations, maintenance and customer 3 service facilities 600,000 4 (3) Butler Township 5 (i) Pullman Center Multi-modal Transfer 6 Center 1,200,000 7 (Base Project Allocation - $1,080,000) 8 (Design and Contingencies - $120,000) 9 (4) Centre Area Transit Authority 10 (i) Replace fueling station 167,000 11 (Base Project Allocation - $150,000) 12 (Design and Contingencies - $17,000) 13 (5) City of Philadelphia 14 (i) Streetscape improvements along Market 15 Street 833,000 16 (Base Project Allocation - $750,000) 17 (Design and Contingencies - $83,000) 18 (ii) Streetscape improvements adjacent to the 19 intersection of 52nd Street and Lancaster 20 Avenue 417,000 21 (Base Project Allocation - $375,000) 22 (Design and Contingencies - $42,000) 23 (iii) Streetscape improvements along Oxford 24 Avenue and Huntingdon Pike in Fox Chase and 25 Rockledge Borough in Montgomery County 207,000 26 (Base Project Allocation - $186,000) 27 (Design and Contingencies - $21,000) 28 (6) Clearfield County 29 (i) Purchase handicapped accessible transit 30 bus for the Clearfield County Area Agency 20050H2317B3325 - 29 -
1 on Aging 100,000 2 (7) Delaware River Port Authority 3 (i) Provide for additional smoke and fire 4 system at Philadelphia Locust Street 5 Subway 111,000 6 (Base Project Allocation - $100,000) 7 (Design and Contingencies - $11,000) 8 (8) Elk County 9 (i) Construction of the St. Marys intermodal 10 transportation center 2,750,000 11 (9) Erie Metropolitan Transportation Authority 12 (i) Construction of new transportation center 2,500,000 13 (Base Project Allocation - $2,250,000) 14 (Design and Contingencies - $250,000) 15 (ii) Purchase and construction/installation of 16 passenger shelters 58,000 17 (Base Project Allocation - $52,000) 18 (Design and Contingencies - $6,000) 19 (iii) Real-time information system project 850,000 20 (10) Fayette County 21 (i) Provide for Fayette County's intermodal 22 transit center and administrative 23 maintenance building 223,000 24 (Base Project Allocation - $201,000) 25 (Design and Contingencies - $22,000) 26 (11) Lehigh and Northampton Transportation 27 Authority 28 (i) Purchase of 12 heavy-duty buses 576,000 29 (Base Project Allocation - $518,000) 30 (Design and Contingencies - $58,000) 20050H2317B3325 - 30 -
1 (ii) Provide for expansion of Easton garage 167,000 2 (Base Project Allocation - $150,000) 3 (Design and Contingencies - $17,000) 4 (iii) Purchase of 20 minibuses 360,000 5 (Base Project Allocation - $324,000) 6 (Design and Contingencies - $36,000) 7 (12) Mid-County Transit Authority 8 (i) Replace vehicle storage facility and 9 upgrade radio equipment 85,000 10 (Base Project Allocation - $76,000) 11 (Design and Contingencies - $9,000) 12 (13) Mid Mon Valley Transit Authority 13 (i) Design and construct park and ride lot 67,000 14 (Base Project Allocation - $60,000) 15 (Design and Contingencies - $7,000) 16 (14) New Castle Transit Center 17 (i) Acquisition, construction, infrastructure, 18 abatement and other related costs for the 19 New Castle Transit Center 1,000,000 20 (15) Luzerne County 21 (i) Acquisition, construction and 22 infrastructure development of an intermodal 23 transportation facility 2,500,000 24 (16) Port Authority of Allegheny County 25 (i) FY 2008-2009 Section 5307 Formula Program 7,275,000 26 (ii) FY 2007-2008 Vehicle Overhaul Program 4,000,000 27 (iii) FY 2007-2008 flex funds 2,000,000 28 (iv) FY 2008-2009 Vehicle Overhaul Program 4,000,000 29 (v) FY 2007-2008 Section 5309 fixed guideway 30 modernization 5,850,000 20050H2317B3325 - 31 -
1 (vi) FY 2008-2009 Infrastructure Safety 2 Renewal Program (ISRP) 16,000,000 3 (vii) FY 2007-2008 Section 5307 Formula 4 Program 7,275,000 5 (viii) FY 2008-2009 Section 5309 fixed 6 guideway modernization 5,850,000 7 (ix) FY 2008-2009 flex funds 2,000,000 8 (x) FY 2007-2008 Infrastructure Safety Renewal 9 Program (ISRP) 16,000,000 10 (17) Schuylkill Transportation System 11 (i) Purchase of four heavy-duty buses 233,000 12 (Base Project Allocation - $210,000) 13 (Design and Contingencies - $23,000) 14 (ii) Construction of Union Station Transit 15 Center 417,000 16 (Base Project Allocation - $375,000) 17 (Design and Contingencies - $42,000) 18 (iii) Purchase of seven small transit buses 19 and one trolley bus and repair and renovate 20 maintenance facility 219,000 21 (Base Project Allocation - $197,000) 22 (Design and Contingencies - $22,000) 23 (18) Southeastern Pennsylvania Transportation 24 Authority 25 (i) FFY 2006 trackless trolley purchase 26 program 3,559,000 27 (Base Project Allocation - $3,203,000) 28 (Design and Contingencies - $356,000) 29 (ii) FFY 2005 bus purchase program 3,559,000 30 (Base Project Allocation - $3,203,000) 20050H2317B3325 - 32 -
1 (Design and Contingencies - $356,000) 2 (iii) FY 2005-2006 vehicle overhaul program 47,000,000 3 (Base Project Allocation - $42,300,000) 4 (Design and Contingencies - $4,700,000) 5 (iv) FY 2005-2006 infrastructure safety 6 renewal program 33,000,000 7 (Base Project Allocation - $29,700,000) 8 (Design and Contingencies - $3,300,000) 9 (v) FFY 2001 additional funding for Section 10 5307 program 453,000 11 (Base Project Allocation - $408,000) 12 (Design and Contingencies - $45,000) 13 (vi) FFY 2006 Federal highway flex projects 834,000 14 (Base Project Allocation - $751,000) 15 (Design and Contingencies - $83,000) 16 (vii) FFY 2005 Federal highway flex projects 834,000 17 (Base Project Allocation - $751,000) 18 (Design and Contingencies - $83,000) 19 (viii) FFY 2001 additional funding for Section 20 5307 fixed guideway program 4,765,000 21 (Base Project Allocation - $4,288,000) 22 (Design and Contingencies - $477,000) 23 (ix) FFY 2006 Federal program 28,167,000 24 (Base Project Allocation - $25,350,000) 25 (Design and Contingencies - $2,817,000) 26 (x) FY 2006-2007 vehicle overhaul program 47,000,000 27 (xi) FY 2007-2008 vehicle overhaul program 47,000,000 28 (xii) FY 2006-2007 infrastructure safety 29 renewal project 33,000,000 30 (xiii) FY 2007-2008 infrastructure safety 20050H2317B3325 - 33 -
1 renewal project 33,000,000 2 (xiv) FY 2006-2007 section 5307 program 68,000,000 3 (xv) FY 2006-2007 section 5309 program 102,000,000 4 (xvi) FY 2007-2008 section 5307 program 69,600,000 5 (xvii) FY 2007-2008 section 5309 program 104,400,000 6 (xviii) FY 2005-2006 bus purchase program 21,354,000 7 (xix) FY 2006-2007 trackless trolley purchase 31,354,000 8 (xx) FY 2007-2008 bus purchase program 21,354,000 9 (xxi) FY 2005-2006 Federal highway flex 10 projects 5,000,000 11 (xxii) FY 2006-2007 Federal highway flex 12 projects 5,000,000 13 (xxiii) FY 2007-2008 Federal highway flex 14 projects 5,000,000 15 (xxiv) FY 2004-2005 transit enhancement 16 program 3,000,000 17 (xxv) FY 2006-2007 transit enhancement 18 program 3,000,000 19 (xxvi) FY 2001-2002 section 3 program 20 (additional) 28,858,000 21 (xxvii) FY 2001-2002 section 9 program 22 (additional) 2,718,000 23 (xxviii) Construction of the SEPTA R5 Rail 24 extension to Coatesville, Parkesburg and 25 Atglen 26,000,000 26 (19) Williamsport Bureau of Transit 27 (i) Improve rail hub at Lycoming Mall and 28 retrofit bus fleet to provide for automatic 29 vehicle location system 150,000 30 (Base Project Allocation - $135,000) 20050H2317B3325 - 34 -
1 (Design and Contingencies - $15,000) 2 (20) York County Transportation Authority 3 (i) Acquisition, construction, infrastructure 4 and related costs for expanding the current 5 Transfer Center 131,000 6 (b) Rural and intercity rail.--Additional capital projects 7 in the category of transportation assistance projects for rural 8 and intercity rail service projects to be constructed or with 9 respect to which an interest is to be acquired by the Department 10 of Transportation, its successors or assigns and to be financed 11 by the incurring of debt are hereby itemized, together with 12 their respective estimated financial costs, as follows: 13 Total 14 Project 15 Project Allocation 16 (1) Cambria County 17 (A) Capital improvements to 8.3 miles of 18 the Cambria Rail Line 800,000 19 (2) Clearfield County 20 (i) Construction, infrastructure and other 21 related costs for the new railroad track 22 and the rehabilitation of existing railroad 23 track in Curwensville Borough 3,000,000 24 (3) CSXT S&C Branch Shortline Railroad 25 (i) Acquisition and rehabilitation 3,000,000 26 (4) Knox-Kane Railroad 27 (i) Upgrades, including ties, ballast and 28 drainage work to allow travel of heavy 29 loads 14,000,000 30 (ii) Acquisition and/or upgrade of a railroad, 20050H2317B3325 - 35 -
1 construction and acquisition 28,000,000 2 (5) Lackawanna County Railroad Authority 3 (i) Construction, infrastructure and other 4 related costs for the Nay Aug Tunnel 5 Railroad clearance project 676,000 6 (6) Lancaster County 7 (i) Renovation of the Lancaster City Amtrak 2,000,000 8 (7) Lawrence County 9 (i) Construction, infrastructure and other 10 related costs for the rehabilitation of 11 rail infrastructure in City of New Castle 3,000,000 12 (8) Lebanon County 13 (i) Pennsy Supply, rehabilitation and 14 construction of a bulk transfer facility 15 including 22,000 feet of track, 14 16 switches, utility relocation, bulk loading 17 and unloading equipment and a railroad 18 scale at the intermodal facility located in 19 North Annville and North Londonderry 20 Townships 9,800,000 21 (ii) Construction of a 3,000 foot rail siding 22 including a new switch and the purchase of 23 bulk loading and unloading equipment at a 24 new intermodal facility in South Lebanon 25 Township 900,000 26 (9) Luzerne County 27 (i) Construction, infrastructure and other 28 related costs for the extension of rail 29 spur to improve rail access in Newport 30 Township 1,000,000 20050H2317B3325 - 36 -
1 (ii) Construction, infrastructure and other 2 related costs for bulk transfer facility 3 located in the City of Hazleton 2,500,000 4 (iii) Construct a bulk transfer facility 5 including 1,600 feet of track, two 6 switches, site preparation, an asphalt pad 7 with an access road, utilities relocation 8 and loading/unloading equipment at an 9 intermodal facility located in the City of 10 Hazleton 2,500,000 11 (10) Monroe County 12 (i) Upgrade railroad crossing at North 13 Courtland and Route 209 500,000 14 (11) Reading, Blue Mountain and Northern Railroad 15 (i) Construction of rail siding at an ethanol 16 facility in Porter Township and 17 construction of rail spur from siding to 18 existing Reading, Blue Mountain and 19 Northern main line 4,500,000 20 (12) SEDA-COG Joint Rail Authority 21 (i) Lewistown Street running railroad track 22 reconstruction 1,540,000 23 (ii) Construction of infrastructure to enhance 24 safety in Spring Township, Centre County 1,100,000 25 (iii) Design and construction of a new and 26 expanded transfer facility at the Newberry 27 Rail Yard, including acquisition and 28 related infrastructure 3,900,000 29 (13) Union Railroad Company 30 (i) USS Mon Valley rail rehabilitation 20050H2317B3325 - 37 -
1 including upgrades, rail installation, 2 switches, road crossings at USS facility, 3 track ties and switches on the Union 4 Railroad mainline in Penn Hills, Turtle 5 Creek, East Pittsburgh, North Versailles, 6 West Mifflin and Clairton 5,020,000 7 (Base Project Allocation - $5,000,000) 8 (Design and Contingencies - $20,000) 9 (14) York County 10 (i) Acquisition of land and construction and 11 engineering of a rail freight intermodal 12 facility 3,000,000 13 (15) ALLEGHENY & EASTERN RAILROAD <-- 14 (I) REHABILITATION OF MAIN LINE FROM ST. MARYS 15 TO ERIE IN WARREN, ELK AND ERIE COUNTIES 16 (MP 131 TO MP 3 INCLUDING JOHNSONBURG YARD, 17 WARREN YARD AND ALL SIDINGS), INCLUDING 18 TIES, RAIL, SURFACE, BRIDGE, SWITCHES, 19 DITCHING, UNDERCUTTING, BRUSH CUTTING, ROAD 20 CROSSINGS AND SIGNAL AND COMMUNICATION AND 21 ANY OTHER RELATED WORK 4,950,000 22 (BASE PROJECT ALLOCATION - $4,500,000) 23 (DESIGN AND CONTINGENCIES - $450,000) 24 (II) REHABILITATION AND THE CONSTRUCTION OF 25 NEW SIDINGS TO SERVE NEW AND EXISTING 26 CUSTOMERS FROM ST. MARYS TO ERIE IN ELK, 27 WARREN AND ERIE COUNTIES (MP 3 TO MP 131 28 INCLUDING ALL YARDS, SIDINGS AND 29 SUBDIVISIONS), INCLUDING TIES, RAIL, 30 SURFACE, BRIDGE, SWITCHES, DITCHING, 20050H2317B3325 - 38 -
1 UNDERCUTTING, BRUSH CUTTING, ROAD CROSSINGS 2 AND SIGNAL AND COMMUNICATION AND ANY OTHER 3 RELATED WORK 1,650,000 4 (BASE PROJECT ALLOCATION - $1,500,000) 5 (DESIGN AND CONTINGENCIES - $150,000) 6 (16) ALIQUIPPA & OHIO RIVER RAILROAD 7 (I) REHABILITATION OF MAIN LINE IN BEAVER 8 COUNTY INCLUDING TIES, RAIL, SURFACE, 9 BRIDGES, SWITCHES, ROAD CROSSINGS AND 10 SIGNAL AND COMMUNICATION, GRADING, DRAINAGE 11 AND OTHER ASSOCIATED IMPROVEMENTS 1,100,000 12 (BASE PROJECT ALLOCATION - $1,000,000) 13 (DESIGN AND CONTINGENCIES - $100,000) 14 (II) REHABILITATION AND THE CONSTRUCTION OF 15 NEW SIDINGS TO SERVE NEW AND EXISTING 16 CUSTOMERS IN BEAVER COUNTY, INCLUDING TIES, 17 RAIL, SURFACE, SWITCHES, ROAD CROSSINGS AND 18 SIGNAL AND COMMUNICATION, GRADING, DRAINAGE 19 AND OTHER ASSOCIATED WORK 1,100,000 20 (BASE PROJECT ALLOCATION - $1,000,000) 21 (DESIGN AND CONTINGENCIES - $100,000) 22 (17) ALLEGHENY VALLEY RAILROAD 23 (I) ALLEGHENY SUBDIVISION RAIL INFRASTRUCTURE 24 REHABILITATION, INCLUDING TRACK, ROADBED, 25 BRIDGES AND GRADE CROSSINGS FROM MP 0 TO MP 26 20 IN ALLEGHENY AND WESTMORELAND COUNTIES 2,530,000 27 (BASE PROJECT ALLOCATION - $2,300,000) 28 (DESIGN AND CONTINGENCIES - $230,000) 29 (II) P&W SUBDIVISION RAIL INFRASTRUCTURE 30 REHABILITATION, INCLUDING TRACK, ROADBED, 20050H2317B3325 - 39 -
1 BRIDGES AND GRADE CROSSINGS FROM MP 1 TO MP 2 17 AND FROM MP 322 TO MP 326 IN ALLEGHENY 3 COUNTY 1,980,000 4 (BASE PROJECT ALLOCATION - $1,800,000) 5 (DESIGN AND CONTINGENCIES - $180,000) 6 (III) W&P SUBDIVISION RAIL INFRASTRUCTURE 7 REHABILITATION, INCLUDING TRACK, ROADBED, 8 BRIDGES AND GRADE CROSSINGS FROM MP 5 TO MP 9 39 IN ALLEGHENY AND WASHINGTON COUNTIES 1,320,000 10 (BASE PROJECT ALLOCATION - $1,200,000) 11 (DESIGN AND CONTINGENCIES - $120,000) 12 (IV) DEVELOPMENT OF NEW YARD TRACK AND 13 INTERMODAL TRANSFER STRUCTURES WITHIN NEW 14 KENSINGTON COMPLEX FROM MP 17 TO MP 19.4 IN 15 WESTMORELAND COUNTY TO SUPPORT RAIL-TRUCK 16 AND RAIL-BARGE TRANSFER MARKET DEVELOPMENT 4,620,000 17 (BASE PROJECT ALLOCATION - $4,200,000) 18 (DESIGN AND CONTINGENCIES - $420,000) 19 (18) BUFFALO & PITTSBURGH RAILROAD 20 (I) REHABILITATION OF MAIN LINE FROM BROCKWAY 21 TO NEW CASTLE IN JEFFERSON, ALLEGHENY, 22 INDIANA, ARMSTRONG, LAWRENCE, BEAVER, 23 CLEARFIELD AND BUTLER COUNTIES (MP 193 TO 24 MP 303.5, INCLUDING DUBOIS YARD, RIKER 25 YARD, BUTLER YARD, NORTHERN SUBDIVISION, 26 INDIANA BRANCH AND ALL SIDINGS), INCLUDING 27 TIES, RAIL, SURFACE, BRIDGE, SWITCHES, 28 DITCHING, UNDERCUTTING, BRUSH CUTTING, ROAD 29 CROSSINGS AND SIGNAL AND COMMUNICATION AND 30 ANY OTHER RELATED WORK 10,450,000 20050H2317B3325 - 40 -
1 (BASE PROJECT ALLOCATION - $9,500,000) 2 (DESIGN AND CONTINGENCIES - $950,000) 3 (II) REHABILITATION OF MAIN LINE FROM BROCKWAY 4 TO STATE LINE, NY, IN JEFFERSON, ELK AND 5 MCKEAN COUNTIES (MP 193 TO MP 116, 6 INCLUDING JOHNSONBURG YARD, BRADFORD YARD, 7 SUBDIVISIONS AND ALL SIDINGS), INCLUDING 8 TIES, RAIL, SURFACE, BRIDGE, SWITCHES, 9 DITCHING, UNDERCUTTING, BRUSH CUTTING, ROAD 10 CROSSINGS AND SIGNAL AND COMMUNICATION AND 11 ANY OTHER RELATED WORK 4,950,000 12 (BASE PROJECT ALLOCATION - $4,500,000) 13 (DESIGN AND CONTINGENCIES - $450,000) 14 (III) REHABILITATION AND THE CONSTRUCTION OF 15 NEW SIDINGS TO SERVE NEW AND EXISTING 16 CUSTOMERS FROM NEW CASTLE TO STATE LINE, 17 NY, IN JEFFERSON, ELK, MCKEAN, BUTLER, 18 LAWRENCE, ARMSTRONG, ALLEGHENY, CAMERON, 19 WARREN, ERIE AND CLEARFIELD COUNTIES (MP 52 20 TO MP 10 AND MP 303 TO MP 116, INCLUDING 21 ALL YARDS, SIDINGS AND SUBDIVISIONS), 22 INCLUDING TIES, RAIL, SURFACE, BRIDGE, 23 SWITCHES, DITCHING, UNDERCUTTING, BRUSH 24 CUTTING, ROAD CROSSINGS AND SIGNAL AND 25 COMMUNICATION AND ANY OTHER RELATED WORK 3,850,000 26 (BASE PROJECT ALLOCATION - $3,500,000) 27 (DESIGN AND CONTINGENCIES - $350,000) 28 (19) CENTRAL COLUMBIA & PENNSYLVANIA RAILROAD 29 (I) REHABILITATION OF MAIN LINE FROM 30 PENNSYLVANIA/OHIO STATE LINE TO DARLINGTON 20050H2317B3325 - 41 -
1 IN BEAVER COUNTY, INCLUDING TIES, RAILS, 2 SURFACE, BRIDGES, SWITCHES, ROAD CROSSINGS 3 AND SIGNAL AND COMMUNICATION, GRADING, 4 DRAINAGE AND OTHER ASSOCIATED IMPROVEMENTS 1,100,000 5 (BASE PROJECT ALLOCATION - $1,000,000) 6 (DESIGN AND CONTINGENCIES - $100,000) 7 (II) REHABILITATION AND THE CONSTRUCTION OF 8 NEW SIDINGS TO SERVE NEW AND EXISTING 9 CUSTOMERS IN BEAVER COUNTY, INCLUDING TIES, 10 RAIL, SURFACE, SWITCHES, ROAD CROSSINGS AND 11 SIGNAL AND COMMUNICATION, GRADING, DRAINAGE 12 AND OTHER ASSOCIATED WORK 1,100,000 13 (BASE PROJECT ALLOCATION - $1,000,000) 14 (DESIGN AND CONTINGENCIES - $100,000) 15 (20) DELAWARE & HUDSON RAILWAY 16 (I) REHABILITATION AND CONSTRUCTION OF RAIL 17 INFRASTRUCTURE FROM STATE LINE TO TAYLOR IN 18 SUSQUEHANNA, WYOMING AND LACKAWANNA 19 COUNTIES, INCLUDING TIES, RAIL, SURFACE, 20 BRIDGES, SWITCHES, ROAD CROSSINGS AND 21 SIGNAL AND COMMUNICATION, GRADING, DRAINAGE 22 AND OTHER ASSOCIATED IMPROVEMENTS 7,700,000 23 (BASE PROJECT ALLOCATION - $7,000,000) 24 (DESIGN AND CONTINGENCIES - $700,000) 25 (II) REHABILITATION AND THE CONSTRUCTION OF 26 SIDINGS TO SERVE NEW AND EXISTING CUSTOMERS 27 IN SUSQUEHANNA, WYOMING AND LACKAWANNA 28 COUNTIES, INCLUDING TIES, RAIL, SURFACE, 29 SWITCHES, ROAD CROSSINGS AND SIGNAL AND 30 COMMUNICATION, GRADING, DRAINAGE AND OTHER 20050H2317B3325 - 42 -
1 ASSOCIATED WORK 1,100,000 2 (BASE PROJECT ALLOCATION - $1,000,000) 3 (DESIGN AND CONTINGENCIES - $100,000) 4 (III) REHABILITATION AND CONSTRUCTION OF RAIL 5 INFRASTRUCTURE FROM TAYLOR TO SUNBURY IN 6 LACKAWANNA, LUZERNE, COLUMBIA, MONTOUR AND 7 NORTHUMBERLAND COUNTIES, INCLUDING TIES, 8 RAIL, SURFACE, BRIDGES, SWITCHES, ROAD 9 CROSSINGS AND SIGNAL AND COMMUNICATION, 10 GRADING, DRAINAGE AND OTHER ASSOCIATED 11 IMPROVEMENTS 7,700,000 12 (BASE PROJECT ALLOCATION - $7,000,000) 13 (DESIGN AND CONTINGENCIES - $700,000) 14 (IV) REHABILITATION AND THE CONSTRUCTION OF 15 SIDINGS TO SERVE NEW AND EXISTING CUSTOMERS 16 IN LACKAWANNA, LUZERNE, COLUMBIA, MONTOUR 17 AND NORTHUMBERLAND COUNTIES, INCLUDING 18 TIES, RAIL, SURFACE, SWITCHES, ROAD 19 CROSSINGS AND SIGNAL AND COMMUNICATION, 20 GRADING, DRAINAGE AND OTHER ASSOCIATED 21 WORK 1,100,000 22 (BASE PROJECT ALLOCATION - $1,000,000) 23 (DESIGN AND CONTINGENCIES - $100,000) 24 (V) REHABILITATION AND THE CONSTRUCTION OF 25 SIDINGS TO SERVE NEW AND EXISTING CUSTOMERS 26 IN PHILADELPHIA, INCLUDING TIES, RAIL, 27 SURFACE, SWITCHES, ROAD CROSSINGS AND 28 SIGNAL AND COMMUNICATION, GRADING, DRAINAGE 29 AND OTHER ASSOCIATED WORK 1,100,000 30 (BASE PROJECT ALLOCATION - $1,000,000) 20050H2317B3325 - 43 -
1 (DESIGN AND CONTINGENCIES - $100,000) 2 (21) FREEPORT TERMINALS 3 (I) CONSTRUCTION OF 1.5-MILE RAILROAD SIDING 4 AT FREEPORT TERMINALS TO ACCESS NORFOLK 5 SOUTHERN AND PITTSBURG SHAWMUT RAILROADS, 6 INCLUDING SWITCHES, CROSSING REHABILITATION 7 AND CONSTRUCTION/RECONSTRUCTION OF 8 UNDERPASS STRUCTURE, INCLUDING NEW 9 RETAINING WALLS AND RECONSTRUCTION OF SLIP 10 TO ACCOMMODATE INTERMODAL TRAFFIC 5,748,000 11 (BASE PROJECT ALLOCATION - $5,225,000) 12 (DESIGN AND CONTINGENCIES - $523,000) 13 (22) MIDDLETOWN & HUMMELSTOWN RAILROAD 14 (I) REHABILITATION OF INTERCHANGE WITH NORFOLK 15 SOUTHERN AND AMTRAK, INCLUDING SWITCHES, 16 SIGNALS AND RAIL INFRASTRUCTURE 880,000 17 (BASE PROJECT ALLOCATION - $800,000) 18 (DESIGN AND CONTINGENCIES - $80,000) 19 (23) MORAN INDUSTRIES 20 (I) REHABILITATION AND REBUILDING OF RAILROAD 21 CROSSING SERVING F. P. LEOPOLD AND MORAN 22 INDUSTRIES AS WELL AS CONNECTING SPUR LINES 23 OFF OF BUFFALO LINE OF NORFOLK SOUTHERN 1,375,000 24 (BASE PROJECT ALLOCATION - $1,250,000) 25 (DESIGN AND CONTINGENCIES - $125,000) 26 (24) PITTSBURGH & OHIO CENTRAL RAILROAD 27 (I) REHABILITATION OF MAIN LINE FROM NEVILLE 28 ISLAND TO BRIDGEVILLE IN ALLEGHENY COUNTY, 29 INCLUDING TIES, RAIL, SURFACE, BRIDGES, 30 SWITCHES, ROAD CROSSINGS AND SIGNAL AND 20050H2317B3325 - 44 -
1 COMMUNICATION, GRADING, DRAINAGE AND OTHER 2 ASSOCIATED IMPROVEMENTS 4,950,000 3 (BASE PROJECT ALLOCATION - $4,500,000) 4 (DESIGN AND CONTINGENCIES - $450,000) 5 (II) REHABILITATION OF MAIN LINE FROM 6 BRIDGEVILLE TO ARDEN IN ALLEGHENY AND 7 WASHINGTON COUNTIES, INCLUDING TIES, RAIL, 8 SURFACE, BRIDGES, SWITCHES, ROAD CROSSINGS 9 AND SIGNAL AND COMMUNICATION, GRADING, 10 DRAINAGE AND OTHER ASSOCIATED IMPROVEMENTS 3,300,000 11 (BASE PROJECT ALLOCATION - $3,000,000) 12 (DESIGN AND CONTINGENCIES - $300,000) 13 (III) REHABILITATION AND THE CONSTRUCTION OF 14 NEW SIDINGS TO SERVE NEW AND EXISTING 15 CUSTOMERS IN ALLEGHENY AND WASHINGTON 16 COUNTIES, INCLUDING TIES, RAIL, SURFACE, 17 SWITCHES, ROAD CROSSINGS AND SIGNAL AND 18 COMMUNICATION, GRADING, DRAINAGE AND OTHER 19 ASSOCIATED WORK 1,100,000 20 (BASE PROJECT ALLOCATION - $1,000,000) 21 (DESIGN AND CONTINGENCIES - $100,000) 22 (25) PITTSBURG & SHAWMUT RAILROAD 23 (I) REHABILITATION OF MAIN LINE FROM FREEPORT 24 TO BROOKVILLE AND SLIGO TO DRIFTWOOD IN 25 CAMERON, ELK, CLEARFIELD, JEFFERSON, 26 CLARION AND ARMSTRONG COUNTIES (MP 3 TO MP 27 110 AND MP 18 TO MP 88, INCLUDING DUBOIS 28 YARD, BROOKVILLE YARD, KITTANNING YARD AND 29 ALL SIDINGS), INCLUDING TIES, RAIL, 30 SURFACE, BRIDGE, SWITCHES, DITCHING, 20050H2317B3325 - 45 -
1 UNDERCUTTING, BRUSH CUTTING, ROAD CROSSINGS 2 AND SIGNAL AND COMMUNICATION AND ANY OTHER 3 RELATED WORK 4,950,000 4 (BASE PROJECT ALLOCATION - $4,500,000) 5 (DESIGN AND CONTINGENCIES - $450,000) 6 (II) REHABILITATION AND CONSTRUCTION OF NEW 7 SIDINGS TO SERVE NEW AND EXISTING CUSTOMERS 8 FROM FREEPORT TO DRIFTWOOD TO SLIGO IN 9 JEFFERSON, ELK, CAMERON AND ARMSTRONG 10 COUNTIES (MP 88 TO MP 110, INCLUDING ALL 11 YARDS, SIDINGS AND SUBDIVISIONS), INCLUDING 12 TIES, RAIL, SURFACE, BRIDGE, SWITCHES, 13 DITCHING, UNDERCUTTING, BRUSH CUTTING, ROAD 14 CROSSINGS AND SIGNAL AND COMMUNICATION AND 15 ANY OTHER RELATED WORK 2,750,000 16 (BASE PROJECT ALLOCATION - $2,500,000) 17 (DESIGN AND CONTINGENCIES - $250,000) 18 (26) RIVER HILL COAL 19 (I) REHABILITATION AND EXPANSION OF TRACK 20 INFRASTRUCTURE FOR NEW THOMPSONTOWN TIPPLE, 21 INCLUDING DRAINAGE, WATER CONTROL 22 ENCLOSURES AND OTHER RAIL INFRASTRUCTURE 23 RELATED TO THE INTERCHANGE AND LOADING OF 24 RAIL CARS 3,520,000 25 (BASE PROJECT ALLOCATION - $3,200,000) 26 (DESIGN AND CONTINGENCIES - $320,000) 27 (II) CONSTRUCTION AND REHABILITATION OF 28 RAILROAD SPUR AT RIVER HILL TIPPLE, 29 INCLUDING SWITCHES AND OTHER RELATED RAIL 30 INFRASTRUCTURE 880,000 20050H2317B3325 - 46 -
1 (BASE PROJECT ALLOCATION - $800,000) 2 (DESIGN AND CONTINGENCIES - $80,000) 3 (III) CONSTRUCTION AND REHABILITATION OF 4 BOWMAN SIDING OFF R. J. CORMAN RAILROAD, 5 INCLUDING SWITCHES AND OTHER RELATED RAIL 6 INFRASTRUCTURE 1,650,000 7 (BASE PROJECT ALLOCATION - $1,500,000) 8 (DESIGN AND CONTINGENCIES - $150,000) 9 (27) WESTMORELAND COUNTY INDUSTRIAL DEVELOPMENT 10 CORPORATION 11 (I) RADEBAUGH SUBDIVISION HEAD WORN AND CURVE 12 WORN RAIL REPLACEMENT FROM MP 0 TO MP 23.8 13 IN WESTMORELAND AND FAYETTE COUNTIES 1,100,000 14 (BASE PROJECT ALLOCATION - $1,000,000) 15 (DESIGN AND CONTINGENCIES - $100,000) 16 (28) WHEELING & LAKE ERIE RAILWAY 17 (I) CONSTRUCTION OF 3,000-FOOT-PLUS PASSING 18 TRACK AND THREE SWITCHES AT BRUCETON TO 19 PROVIDE INTERCHANGE CAPABILITY WITH 20 ALLEGHENY VALLEY RAILROAD 556,000 21 (BASE PROJECT ALLOCATION - $505,000) 22 (DESIGN AND CONTINGENCIES - $51,000) 23 (II) REHABILITATION OF RAIL INFRASTRUCTURE, 24 INCLUDING REPLACEMENT OF RAIL TIES AND 25 UPGRADE OF SEVERAL CROSSINGS LOCATED IN 26 APPROXIMATELY 40 MILES OF ROOK SUBDIVISION 27 OF WHEELING & LAKE ERIE RAILROAD 990,000 28 (BASE PROJECT ALLOCATION - $900,000) 29 (DESIGN AND CONTINGENCIES - $90,000) 30 (III) REHABILITATION OF TRACK INFRASTRUCTURE 20050H2317B3325 - 47 -
1 OF THE MIFFLIN BRANCH OF WHEELING & LAKE 2 ERIE RAILROAD, INCLUDING REPLACEMENT OF 3 TIES, RAIL, BALLAST AND OTHER RELATED 4 MATERIALS 528,000 5 (BASE PROJECT ALLOCATION - $480,000) 6 (DESIGN AND CONTINGENCIES - $48,000) 7 (29) GREEN HOLDINGS 8 (I) CONSTRUCTION OF RAIL SIDING AT PROPOSED 9 GREEN HOLDING, LLC ETHANOL FACILITY IN 10 PORTER TOWNSHIP, SCHUYLKILL COUNTY, AND 11 CONSTRUCTION OF RAIL SPUR FROM SIDING TO 12 EXISTING READING, BLUE MOUNTAIN AND 13 NORTHERN MAIN LINE FOR TRANSFER AND 14 UNLOADING OF CORN AND OTHER COMMODITIES 4,950,000 15 (BASE PROJECT ALLOCATION - $4,500,000) 16 (DESIGN AND CONTINGENCIES - $450,000) 17 (c) Air transportation.--Additional capital projects in the 18 category of transportation assistance projects for air 19 transportation service to which an interest is to be acquired by 20 the Department of Transportation, its successors or assigns and 21 to be financed by the incurring of debt are hereby itemized, 22 together with their respective estimated financial costs, as 23 follows: 24 Total 25 Project 26 Project Allocation 27 (1) Berks County 28 (i) Reading Regional Airport 29 (A) Construct hangars 250,000 30 (Base Project Allocation - $200,000) 20050H2317B3325 - 48 -
1 (Design and Contingencies - $50,000) 2 (ii) Kutztown Airport 3 (A) Acquisition and development of the 4 Kutztown Airport 1,400,000 5 (2) Butler County 6 (i) Butler County Airport 7 (A) Construct hangars 500,000 8 (Base Project Allocation - $400,000) 9 (Design and Contingencies - $100,000) 10 (3) Cambria County 11 (i) Cambria County Airport 12 (A) Construct hangars 400,000 13 (Base Project Allocation - $320,000) 14 (Design and Contingencies - $80,000) 15 (4) Carbon County 16 (i) Carbon County Airport 17 (A) Construct hangars 300,000 18 (Base Project Allocation - $240,000) 19 (Design and Contingencies - $60,000) 20 (5) Chester County 21 (i) Chester County Airport 22 (A) Construct hangars 513,000 23 (Base Project Allocation - $410,000) 24 (Design and Contingencies - $103,000) 25 (6) Lawrence County 26 (i) New Castle Airport Authority 27 (A) Acquisition, construction, 28 infrastructure and other related costs 29 for the New Castle Airport Authority 30 expansion 4,500,000 20050H2317B3325 - 49 -
1 (7) Lehigh County 2 (i) Lehigh Valley International Airport 3 (A) Land acquisition 1,500,000 4 (Land Allocation - $1,500,000) 5 (8) Luzerne County 6 (i) Wilkes-Barre/Wyoming Valley Airport 7 (A) Construct hangars 450,000 8 (Base Project Allocation - $360,000) 9 (Design and Contingencies - $90,000) 10 (9) Lycoming County 11 (i) Williamsport Regional Airport, 12 Montoursville Borough 13 (A) Design and construction of facility 14 improvements, including directional 15 signage, terminal building, 16 renovations, parking and Pennsylvania 17 State Police hangar improvements 676,000 18 (10) Northumberland County 19 (i) Northumberland County Airport 20 (A) Construct hangars 104,000 21 (Base Project Allocation - $83,000) 22 (Design and Contingencies - $21,000) 23 Section 6. Itemization of redevelopment assistance projects. 24 Additional capital projects in the category of redevelopment 25 assistance projects for capital grants by the Department of 26 Community and Economic Development, its successors or assigns, 27 authorized under the provisions of the act of May 20, 1949 28 (P.L.1633, No.493), known as the Housing and Redevelopment 29 Assistance Law, and redevelopment assistance capital projects 30 and to be financed by the incurring of debt, are hereby 20050H2317B3325 - 50 -
1 itemized, together with their estimated financial costs, as 2 follows: 3 Total 4 Project 5 Project Allocation 6 (1) Adams County 7 (i) County projects 8 (A) Construction of the Gettysburg Area 9 School District stadium 500,000 10 (ii) Cumberland Township 11 (A) Consolidation and rehabilitation of 12 YWCA facilities, including 13 construction 500,000 14 (iii) Gettysburg Borough 15 (A) Construction of the Borough Public 16 Swimming Pool 500,000 17 (iv) Huntington Township 18 (A) Infrastructure, development, site 19 development, design and construction of 20 buildings related to the construction 21 of a new equestrian facility 20,000,000 22 (2) Allegheny County 23 (i) City of Pittsburgh 24 (A) Construction, infrastructure and 25 related costs for the restoration of 26 the historic New Grenada Theater 1,000,000 27 (B) Construction, infrastructure and 28 related costs to expand the National 29 Aviary 10,000,000 30 (C) Construction, infrastructure and 20050H2317B3325 - 51 -
1 related costs for the Pittsburgh Glass 2 Center expansion project 2,000,000 3 (D) Construction and related costs for the 4 Eighth Street Project in Pittsburgh's 5 Cultural District 30,000,000 6 (E) Construction and related costs for the 7 renovation and expansion of the Jewish 8 Community Center of Greater Pittsburgh 9 facilities 1,275,000 10 (F) Acquisition, construction, 11 infrastructure improvements and other 12 related costs for an economic and 13 community development project 5,000,000 14 (G) Construction and other related costs 15 to expand the UPMC Transplant Center 20,000,000 16 (H) Construction, infrastructure and other 17 related costs for the expansion of the 18 Pittsburgh Zoo 10,000,000 19 (I) Acquisition, construction, 20 infrastructure and other related costs 21 for Federal North Federal Hill 3,000,000 22 (J) Construction, infrastructure and other 23 related costs for City Theatre 2,000,000 24 (K) Construction, infrastructure and other 25 related costs for an early childhood 26 center at the Western Pennsylvania 27 School for Blind Children 2,100,000 28 (L) Construction, infrastructure and other 29 related costs for the expansion of 30 Duquesne University 10,000,000 20050H2317B3325 - 52 -
1 (M) University of Pittsburgh Medical 2 Center, acquisition of land, demolition 3 and construction of a multifaceted 4 biomedical research facility to conduct 5 basic research programs, basic cancer 6 research programs and translational and 7 clinical research 20,000,000 8 (N) Expansion of the Children's Institute, 9 including acquisition, construction, 10 abatement of hazardous materials and 11 related infrastructure 6,000,000 12 (O) Construction of a translational 13 research facility 10,000,000 14 (P) Renovation of brewing and bottling 15 plant, including construction of new 16 building 5,000,000 17 (Q) Construction of Shaler Area Emergency 18 Services Building 500,000 19 (R) Expansion of the National Aviary 10,000,000 20 (ii) County projects 21 (A) Improvements to SPC Regional 22 Enterprise Tower, including 23 construction and infrastructure 3,750,000 24 (B) Expansion of the emergency department, 25 including construction of a building 26 that will house additional health care 27 services in Mt. Lebanon 10,000,000 28 (C) Expansion and renovation of the Alle- 29 Kiski Medical Center's Emergency 30 Department 5,000,000 20050H2317B3325 - 53 -
1 (iii) Bethel Park 2 (A) Acquisition and construction of a YMCA 3 branch facility in Bethel Park, 4 including related infrastructure 1,000,000 5 (B) Renovation of Logan School, including 6 construction, abatement of hazardous 7 materials and infrastructure, for 8 redevelopment as a community college 9 facility 3,500,000 10 (iv) Carnegie Borough 11 (A) Acquisition, construction and other 12 related costs for the redevelopment of 13 the Carnegie downtown business 14 district 1,000,000 15 (v) Millvale Borough 16 (A) Construction, site improvement, site 17 redevelopment and other related costs 18 for the Hillside parking and 19 development project 500,000 20 (B) Acquisition, construction and other 21 related costs to redevelop North Avenue 22 and Grant Avenue 500,000 23 (C) Construction, abatement and other 24 related costs for the redevelopment of 25 301 North Avenue 500,000 26 (vi) Monroeville Borough 27 (A) Construction and related costs for a 28 recreation and cultural community 29 center 5,000,000 30 (vii) O'Hara Township 20050H2317B3325 - 54 -
1 (A) Construction and renovation of Laure 2 Ann West Memorial Library 1,000,000 3 center 5,000,000 4 (viii) Plum Borough 5 (A) Construction and related costs for the 6 Plum Senior Community Center 1,000,000 7 (ix) Reserve Township 8 (A) Acquisition, construction and other 9 related costs for a municipal building 500,000 10 (x) Ross Township 11 (A) Construction and other related costs 12 to expand the Ross Township emergency 13 management building 500,000 14 (B) Site development and construction of 15 an emergency management facility to 16 include emergency-related equipment 17 storage 750,000 18 (xi) Scott Township 19 (A) Acquisition, construction and other 20 related costs for improvements to the 21 Brookview Avenue neighborhood 1,000,000 22 (xii) Sewickley Borough 23 (A) Expansion and renovation of Sewickley 24 Valley Hospital emergency room, 25 including construction and related 26 infrastructure 4,000,000 27 Brookview Avenue neighborhood 1,000,000 28 (xiii) Shaler Township 29 (A) Acquisition, construction, 30 infrastructure and other related costs 20050H2317B3325 - 55 -
1 for the Shaler Area EMS headquarters 500,000 2 (xiv) Sharpsburg Borough 3 (A) Construction and other related costs 4 to renovate the Linden Gym to include a 5 public library 500,000 6 (xv) Upper St. Clair Township 7 (A) Redevelopment and construction for the 8 development of the Boyce Mayview Park, 9 including infrastructure 5,000,000 10 (B) Expansion of the Upper St. Clair 11 Township Volunteer Fire Department, 12 including acquisition, construction and 13 related infrastructure 1,500,000 14 (xvi) Urban Redevelopment Authority of 15 Pittsburgh 16 (A) Acquisition, construction, 17 infrastructure, abatement and other 18 related costs for neighborhood 19 development in the City of Pittsburgh 10,000,000 20 (B) Construction, infrastructure and other 21 related costs for a public market 22 place 5,000,000 23 (C) Rehabilitation and replacement of the 24 Allegheny riverwall and construction of 25 public infrastructure and amenities 26 along the Allegheny River 2,000,000 27 (D) Streetscape improvements, 28 industrial/commercial site development 29 and other capital revitalization 30 activities to promote economic 20050H2317B3325 - 56 -
1 development in the Strip District 6,000,000 2 (E) South Hills High School and other 3 closed school buildings, acquisition, 4 construction, abatement of hazardous 5 materials, redevelopment and related 6 infrastructure 5,000,000 7 (XVII) HAMPTON TOWNSHIP <-- 8 (A) REDEVELOPMENT AND RESTORATION OF A 9 HISTORIC FACILITY 500,000 10 (3) Armstrong County 11 (i) County projects (Reserved) 12 (ii) Freeport Borough 13 (A) Redevelopment of the downtown area, 14 including environmental remediation, 15 construction and related 16 infrastructure 2,500,000 17 (iii) Kiskiminetas Township 18 (A) Acquisition and environmental <-- 19 remediation of land and construction of 20 township building 1,000,000 21 (A) CONSTRUCTION OF TOWNSHIP BUILDING, <-- 22 INCLUDING ACQUISITION AND ENVIRONMENTAL 23 REMEDIATION OF LAND 1,000,000 24 (iv) Manor Township 25 (A) Acquisition of land and construction 26 of township building, including related 27 infrastructure 500,000 28 (V) FORD CITY <-- 29 (A) RENOVATION OF THE DOWNTOWN AREA OF 30 FORD CITY, INCLUDING CONSTRUCTION AND 20050H2317B3325 - 57 -
1 RELATED INFRASTRUCTURE 550,000 2 (4) Beaver County 3 (i) County projects 4 (A) Acquisition, construction, 5 infrastructure and other related costs 6 for the Beaver County Conference 7 Center 10,000,000 8 (B) Construction and related costs for the 9 renovation and expansion of The Medical 10 Center Emergency Room 3,000,000 11 (C) Acquisition, construction, 12 infrastructure and other related costs 13 for the Beaver development project 5,000,000 14 (D) Acquisition, construction and 15 infrastructure improvements and other 16 related costs for an economic and 17 community development project 5,000,000 18 (E) Expansion of the Beaver County YMCA 2,000,000 19 (F) Construction, infrastructure and other 20 related costs to rehabilitate and 21 restore the recreation and cultural 22 center in Center Township 7,000,000 23 (ii) City of Aliquippa 24 (A) Acquisition, construction, 25 infrastructure and other related costs 26 for the Aliquippa development project 5,000,000 27 (iii) Ambridge Borough 28 (A) Acquisition, construction, 29 infrastructure and other related costs 30 for the Ambridge development project 5,000,000 20050H2317B3325 - 58 -
1 (iv) Beaver Borough 2 (A) Construction and related costs for a 3 county administration building 3,000,000 4 (v) City of Beaver Falls 5 (A) Acquisition, construction, 6 infrastructure and other related costs 7 for the Beaver Falls development 8 project 5,000,000 9 (vi) Bridgewater Borough 10 (A) Acquisition, construction, 11 infrastructure and other related costs 12 for the Bridgewater development 13 project 5,000,000 14 (vii) Chippewa Township 15 (A) Acquisition, construction, 16 infrastructure and other related costs 17 for the Chippewa Township development 18 project 5,000,000 19 (viii) Darlington Township 20 (A) Acquisition, construction, 21 infrastructure and other related costs 22 for the Darlington Township development 23 project 5,000,000 24 (ix) East Rochester Borough 25 (A) Acquisition, construction, 26 infrastructure and other related costs 27 for the East Rochester development 28 project 5,000,000 29 (x) Economy Borough 30 (A) Acquisition, construction, 20050H2317B3325 - 59 -
1 infrastructure and other related costs 2 for the Economy development project 5,000,000 3 (xi) Freedom Borough 4 (A) Acquisition, construction, 5 infrastructure and other related costs 6 for the Freedom development project 5,000,000 7 (xii) Hopewell Township 8 (A) Acquisition, construction, 9 infrastructure and other related costs 10 for the Hopewell Township redevelopment 11 project 5,000,000 12 (xiii) Industry Borough 13 (A) Acquisition, construction, 14 infrastructure and other related costs 15 for the Industry redevelopment project 5,000,000 16 (xiv) Midland Borough 17 (A) Acquisition, construction, 18 infrastructure and other related costs 19 for the Midland development project 5,000,000 20 (B) Site acquisition, site improvement and 21 site cleanup of Midland industrial 22 sites. This project shall be construed 23 as a supplement to the project 24 authorized in section 6(4)(xi)(A) of 25 the act of June 22, 2004 (P.L.257, 26 No.40), known as the Capital Budget 27 Itemization Act of 2003-2004. 5,000,000 28 (xv) Monaca Borough 29 (A) Acquisition, construction, 30 infrastructure and other related costs 20050H2317B3325 - 60 -
1 for the Monaca development project 5,000,000 2 (xvi) New Brighton Borough 3 (A) Acquisition, construction, 4 infrastructure and related costs for a 5 materials technology center 1,000,000 6 (B) Acquisition, construction, 7 infrastructure and other related costs 8 for the New Brighton development 9 project 5,000,000 10 (xvii) New Sewickley Township 11 (A) Construction and infrastructure costs 12 related to the New Sewickley Township 13 municipal building expansion project 3,500,000 14 (xviii) Ohioville Borough 15 (A) Acquisition, construction, 16 infrastructure and other related costs 17 for the Ohioville development project 5,000,000 18 (xix) Rochester Borough 19 (A) Acquisition, construction, 20 infrastructure and other related costs 21 for the Rochester development project 5,000,000 22 (xx) Rochester Township 23 (A) Acquisition, construction, 24 infrastructure and other related costs 25 for the Rochester Township development 26 project 10,000,000 27 (xxi) Shippingport Borough 28 (A) Acquisition, construction, 29 infrastructure and other related costs 30 for the Shippingport development 20050H2317B3325 - 61 -
1 project 5,000,000 2 (xxii) South Beaver Township 3 (A) Acquisition, construction, 4 infrastructure and other related costs 5 for the South Beaver Township 6 development project 5,000,000 7 (xxiii) Vanport Township 8 (A) Acquisition, construction, 9 infrastructure and other related costs 10 for the Vanport Township development 11 project 5,000,000 12 (5) Bedford County 13 (i) County projects 14 (A) Bedford Area School District, 15 renovation of the high school 16 auditorium including construction, and 17 construction of restroom facilities at 18 the track/soccer complex 1,500,000 19 (B) Construction of Bedford County 20 Business Center II, a second 21 multitenant building 1,500,000 22 (6) Berks County 23 (i) County projects (Reserved) 24 (ii) Bern Township 25 (A) Mid-Atlantic Air Museum expansion, 26 including construction 600,000 27 (iii) New Morgan Borough 28 (A) Development of a Smart Growth 29 Community, including construction and 30 abatement of hazardous materials for 20050H2317B3325 - 62 -
1 commercial, industrial and recreational
2 uses 25,000,000
3 (iv) Tulpehocken Township
4 (A) Rehabilitation and construction of the
5 Tulpehocken Elementary School Building 1,000,000
6 (V) HAMBURG BOROUGH <--
7 (A) CONSTRUCTION OF THE READING COMPANY
8 HERITAGE MUSEUM, INCLUDING
9 ENVIRONMENTAL REMEDIATION 1,200,000
10 (B) DOWNTOWN STREETSCAPE IMPROVEMENTS 500,000
11 (7) Blair County
12 (i) County projects
13 (A) Construction of trolley line from
14 Altoona to Bellwood 1,800,000
15 (B) Expansion of Lower Trail west of
16 Williamsburg to Hollidaysburg Borough,
17 including construction 1,600,000
18 (C) Redevelopment of Veteran's VETERANS' <--
19 Field, including construction 2,100,000
20 (D) REDEVELOPMENT OF FACILITIES DAMAGED BY <--
21 FLOODING, INCLUDING INFRASTRUCTURE 1,000,000
22 (ii) City of Altoona
23 (A) Redevelopment and construction of the
24 Round House and yard 1,800,000
25 (iii) North Woodbury Township
26 (A) Construction of a manure abatement
27 facility 10,000,000
28 (8) Bradford County
29 (i) County projects (Reserved)
30 (ii) North Towanda Township
20050H2317B3325 - 63 -
1 (A) Expansion of the Zodiaq Complex, 2 including construction 8,000,000 3 (9) Bucks County 4 (i) County projects 5 (A) Expansion of the Mercer Museum 5,000,000 6 (B) Construction of a performing arts 7 center at a county-owned parking 8 facility 2,000,000 9 (C) Construction, renovation and expansion 10 of a 50-bed inpatient unit 7,500,000 11 (D) Construction, renovation and expansion 12 of a Breast Center at St. Mary Medical 13 Center 2,650,000 14 (E) Construction, renovation and expansion 15 of the Intensive Care Unit at St. Mary 16 Medical Center 3,900,000 17 (F) Construction, renovation and expansion 18 of a Heart Center at St. Mary Medical 19 Center 15,000,000 20 (G) ACQUISITION OF PROPERTY IN CONJUNCTION <-- 21 WITH THE NEW COURTHOUSE, INCLUDING SITE 22 IMPROVEMENTS AND CONSTRUCTION 500,000 23 (H) RESTORATION OF THE KING LIBRARY 500,000 24 (ii) Hilltown Township 25 (A) Development of a township park, 26 including redevelopment and related 27 infrastructure 610,000 28 (iii) Hulmeville Borough 29 (A) Redevelopment of a Hulmeville 30 historical building, including 20050H2317B3325 - 64 -
1 construction 500,000
2 (iv) Lower Southampton Township
3 (A) Construction and/or redevelopment of a
4 building for an indoor recreation and
5 community center This. THIS <--
6 authorization includes costs for
7 acquisition of land and/or buildings if
8 necessary. 2,000,000
9 (v) Middletown Township
10 (A) Acquisition of land and construction
11 of a community center 5,000,000
12 (B) Construction of the Northern Emergency
13 Services Station to provide emergency
14 services and public works 1,500,000
15 (C) Construction of a public works
16 facility to include administrative
17 offices, bays for trucks, equipment
18 repair and a truck washing facility 1,500,000
19 (vi) Northampton Township
20 (A) Construction of a new township
21 building 1,000,000
22 (vii) Upper Makefield Township
23 (A) Renovation of fire company building,
24 including construction 1,000,000
25 (viii) Warminster Township
26 (A) Construction of a new firehouse 1,000,000
27 (ix) Warwick Township
28 (A) Construction of a new firehouse 1,000,000
29 (X) DOYLESTOWN BOROUGH <--
30 (A) ACQUISITION OF PROPERTY IN CONJUNCTION
20050H2317B3325 - 65 -
1 WITH THE NEW COURTHOUSE, INCLUDING SITE 2 IMPROVEMENTS AND CONSTRUCTION 500,000 3 (XI) BENSALEM TOWNSHIP 4 (A) CONSTRUCTION OF SOCCER AND 5 RECREATIONAL AMENITIES 850,000 6 (B) ACQUISITION OF ADDITIONAL ACREAGE TO 7 ADD TO THE CENTRAL PARK CAMPUS 600,000 8 (C) CONSTRUCTION OF AN EMERGENCY SERVICES 9 TRAINING CENTER 1,250,000 10 (XII) LOWER SOUTHAMPTON TOWNSHIP 11 (A) EXPANSION OF THE ST. MARY'S HOSPITAL, 12 INCLUDING CONSTRUCTION 5,000,000 13 (10) Butler County 14 (i) County projects 15 (A) Acquisition, construction and related 16 costs for Phase II of the Slippery Rock 17 Revitalization Program 1,400,000 18 (ii) Zelienople Borough 19 (A) Construction of a family hospitality 20 center and renovation and expansion of 21 existing facilities at Glade Run 22 Lutheran Services main campus 2,500,000 23 (11) Cambria County 24 (i) County projects 25 (A) Construction, infrastructure and other 26 related costs for improvements to the 27 Stoneycreek River Basin 2,000,000 28 (ii) City of Johnstown 29 (A) Acquisition, construction, 30 infrastructure and other related costs 20050H2317B3325 - 66 -
1 for the City Operations Center 5,000,000 2 (B) Construction, infrastructure and other 3 related costs for a regional technology 4 park 5,000,000 5 (C) Acquisition, construction, 6 infrastructure and other related costs 7 for a festival park 3,000,000 8 (D) Acquisition, construction, 9 infrastructure and other related costs 10 for the Artworks project 2,000,000 11 (E) Acquisition, construction, 12 infrastructure and other related costs 13 for redevelopment of facilities along 14 the Stoneycreek Branch 3,000,000 15 (iii) Richland Township 16 (A) Acquisition, construction, 17 infrastructure and other related costs 18 for a new main campus building at Penn 19 Highlands Community College 9,000,000 20 (12) Cameron County (Reserved) 21 (13) Carbon County 22 (i) County projects 23 (A) Construction, infrastructure and other 24 related costs for the renovation of a 25 county office building 1,000,000 26 (ii) Nesquehoning Borough 27 (A) Construction, infrastructure and other 28 related costs for the Broad Mountain 29 Resort 7,500,000 30 (iii) Palmerton Borough 20050H2317B3325 - 67 -
1 (A) Construction, infrastructure, 2 abatement and other related costs for 3 the redevelopment of the former 4 Horsehead Laboratory building 500,000 5 (iv) Summit Hill Borough 6 (A) Construction and other related costs 7 for a new municipal office and fire 8 company building 1,250,000 9 (v) Weatherly Borough 10 (A) Construction, infrastructure, 11 abatement and other related costs to 12 expand the Weatherly Casting and 13 Machine manufacturing facility 500,000 14 (14) Centre County 15 (i) County projects 16 (A) Redevelopment of the downtown area in 17 Philipsburg Borough, including 18 construction 3,000,000 19 (ii) Bellefonte Borough 20 (A) Redevelopment of the downtown area in 21 Bellefonte Borough, including 22 construction and related 23 infrastructure 3,000,000 24 (iii) Benner Township 25 (A) Construction, infrastructure and other 26 related costs for Rockview Office Park 6,000,000 27 (iv) Centre Hall Borough 28 (A) Construction of a multipurpose complex 29 to facilitate activities, such as 30 Grange Fairs 1,500,000 20050H2317B3325 - 68 -
1 (v) Phillipsburg Borough 2 (A) Construction and other related costs 3 for the improvement and renovation of 4 intensive care, emergency room and 5 oncology facilities 500,000 6 (vi) State College Borough 7 (A) Redevelopment of the downtown area in 8 State College Borough, including 9 construction 3,000,000 10 (VII) RUSH TOWNSHIP <-- 11 (A) EXPANSION OF THE PHILIPSBURG HOSPITAL 12 FOR ADULT ASSISTED LIVING, INCLUDING 13 CONSTRUCTION, RENOVATION AND ABATEMENT 14 OF HAZARDOUS MATERIALS 2,550,000 15 (15) Chester County 16 (i) County projects (Reserved) 17 (ii) Kennett Square Borough 18 (A) Acquisition of a building to 19 consolidate social services, adult 20 education and primary health care 2,000,000 21 (iii) Parkesburg Borough 22 (A) Parkesburg Police and Borough Hall 23 acquisition, construction and 24 redevelopment 2,700,000 25 (iv) Schuylkill Township 26 (A) Renovation of the Schuylkill School 27 building 500,000 28 (16) Clarion County 29 (i) County projects (Reserved) 30 (ii) Clarion County Economic Development 20050H2317B3325 - 69 -
1 Corporation 2 (A) Development of the Knox Industrial 3 Park, including construction and 4 related infrastructure 1,000,000 5 (B) Construction of the Beaver Creek Dam 6 and related infrastructure 4,000,000 7 (C) Construction of a new YMCA building 4,000,000 8 (D) Extension of the Paint Township 9 waterline, including construction and 10 related infrastructure 1,000,000 11 (17) Clearfield County 12 (i) County projects 13 (A) Acquisition, construction and other 14 related costs for Allegheny Custom 15 Forming Systems 3,000,000 16 (B) Construction and other related costs 17 for the Biomass Conversion Center of 18 Excellence 2,000,000 19 (C) Construction and other related costs 20 for a new cancer center 3,000,000 21 (D) Construction, infrastructure and other 22 related costs for the improvement of 23 the Clearfield business area 500,000 24 (ii) Curwensville Borough 25 (A) Construction, infrastructure and other 26 related costs for the Sunnyside Ethanol 27 Manufacturing Plant 2,000,000 28 (B) CONSTRUCTION, INFRASTRUCTURE AND OTHER <-- 29 RELATED COSTS TO IMPROVE THE 30 CURWENSVILLE BUSINESS AREA 500,000 20050H2317B3325 - 70 -
1 (iii) Houtzdale Borough 2 (A) Construction, infrastructure and other 3 related costs for the improvement of 4 the Houtzdale business district 500,000 5 (iv) Karthaus Township 6 (A) Construction, infrastructure and other 7 related costs for the River Hill Power 8 Waste Coal Fired Power Plant 15,000,000 9 (v) Lawrence Township 10 (A) Acquisition, construction and other 11 related costs for the expansion of the 12 Quality Veneer Corporation 500,000 13 (B) Construction, infrastructure and other 14 related costs for the development of 15 the Wolf Run Industrial Park 2,000,000 16 (C) Acquisition, construction and other 17 related costs to develop the former FCI 18 Electronics complex 500,000 19 (18) Clinton County (Reserved) 20 (19) Columbia County (Reserved) 21 (20) Crawford County (Reserved) 22 (21) Cumberland County (Reserved) 23 (22) Dauphin County 24 (i) County projects 25 (A) Expansion and/or construction of 26 medical facilities, Hershey Medical 27 Center 14,500,000 28 (ii) City of Harrisburg 29 (A) Construction, infrastructure and other 30 related costs for the development of a 20050H2317B3325 - 71 -
1 minority business development center 5,500,000 2 (B) Construction and development of the 3 South Third Street area, including 4 parking, retail, commercial and 5 industrial activities 13,000,000 6 (C) Replacement of the deteriorating Dock 7 Street Dam to improve public safety and 8 the passage of migratory fish, to 9 preserve and enhance recreation and 10 waterfront development and to protect 11 existing environmental values. This 12 project shall be construed as a 13 supplement to the authorization in 14 section 6(22)(ii)(M) of the act of 15 October 30, 2002 (P.L.891, No.131), 16 known as the Capital Budget Project 17 Itemization Act of 2001-2002. 15,000,000 18 (D) Expansion and improvement of Commerce 19 Bank Park, formerly known as Riverside 20 Stadium, and Skyline Sports Complex. 21 This project shall be construed as a 22 supplement to the authorization in 23 section 6(22)(ii)(A) of the act of June 24 22, 2004 (P.L.257, No.40), known as the 25 Capital Budget Project Itemization Act 26 of 2003-2004. 4,500,000 27 (E) Construction, infrastructure and other 28 related costs for the Harrisburg 29 Technology Project 7,900,000 30 (F) Construction, infrastructure and other 20050H2317B3325 - 72 -
1 related costs to accommodate a major 2 restaurant complex on Harrisburg City 3 Island 950,000 4 (G) Construction, infrastructure and other 5 related costs for the Paxton Commons 6 warehouse project 4,000,000 7 (H) Construction, infrastructure and other 8 related costs for an arts cooperative 9 complex with workspaces, classrooms, 10 offices, exhibit space and related 11 facilities 3,000,000 12 (I) Construction, infrastructure and 13 related costs for the Second Street 14 Corridor Improvement Project 4,750,000 15 (J) Construction, infrastructure and other 16 related costs for the Mulberry Street 17 Boulevard Project 3,000,000 18 (K) Construction, infrastructure and other 19 related costs for the Native American - 20 Susquehanna River Exhibit Center 1,500,000 21 (L) Construction of multilevel parking 22 structures to advance economic 23 development projects 30,000,000 24 (M) Construction, infrastructure and other 25 related costs for the downtown 26 streetscapes project 17,900,000 27 (N) Construction, infrastructure, 28 abatement and other related costs to 29 redevelop blighted property 3,000,000 30 (O) Construction, infrastructure and other 20050H2317B3325 - 73 -
1 related costs to convert an existing 2 warehouse complex into productive 3 commercial reuse 5,000,000 4 (P) Construction, renovation and 5 infrastructure improvement, Hershey- 6 Harrisburg Capital Region Visitor 7 Information Center 2,000,000 8 (iii) Conewago Township 9 (A) Construction of the Conewago Township 10 Municipal Building 2,000,000 11 (iv) Derry Township 12 (A) Construction of a competitive pool and 13 related facility 8,000,000 14 (v) Lower Paxton Township 15 (A) Construction of the Dauphin County 16 Heroes Grove 2,500,000 17 (B) Construction, infrastructure and other 18 related costs for an economic 19 development project including a hotel 20 and retail space 4,000,000 21 (vi) Lower Swatara Township 22 (A) Construction and redevelopment of the 23 Meade Heights property, including 24 related infrastructure 5,000,000 25 (B) Construction of a recreation facility 2,000,000 26 Visitor Information Center 2,000,000 27 (vii) Steelton Borough 28 (A) Downtown revitalization project 5,000,000 29 (viii) Susquehanna Township 30 (A) Expansion and construction of the 20050H2317B3325 - 74 -
1 Widener University Campus, to improve 2 academic classroom space, increase 3 library space and increase academic 4 support services 25,000,000 5 (ix) Swatara Township 6 (A) Construction of a retail complex and 7 related infrastructure 6,000,000 8 (23) Delaware County 9 (i) County projects (Reserved) 10 (ii) Aston Township 11 (A) Construction of a conference and 12 community center at Neumann College 3,000,000 13 (iii) City of Chester 14 (A) Construction, rehabilitation and 15 renovation of a multitenant commercial 16 complex 1,450,000 17 (IV) CONCORD TOWNSHIP <-- 18 (A) EXPANSION OF THE RACHEL KOHL COMMUNITY 19 LIBRARY 500,000 20 (B) CONSTRUCTION OF A NEW FIELD HOUSE FOR 21 THE BRANDYWINE YOUTH CLUB 500,000 22 (V) RIDLEY TOWNSHIP 23 (A) CAPITAL IMPROVEMENTS TO TOWNSHIP 24 FACILITIES RELATED TO TECHNOLOGY 25 UPGRADES 500,000 26 (24) Elk County 27 (i) County projects 28 (A) Construction and infrastructure 29 improvements related to the Elk 30 Regional Medical Center expansion 4,000,000 20050H2317B3325 - 75 -
1 (B) Construction, infrastructure 2 improvements and abatement of hazardous 3 materials related to the Fox Township 4 Industrial Park expansion 1,000,000 5 (ii) Fox Township 6 (A) Construction and infrastructure 7 improvements related to the Fox 8 Township Community Park 500,000 9 (iii) City of St. Marys 10 (A) Construction of mixed-use facility 11 including parking garage in downtown 12 St. Marys 1,100,000 13 (25) Erie County 14 (i) County projects (Reserved) 15 (ii) City of Erie 16 (A) Renovation and construction of the 17 Jerry Uht Baseball Park 2,000,000 18 (B) Razing and construction of gymnasium 19 and locker facilities at Strong Vincent 20 High School 2,000,000 21 (C) Construction of multipurpose, 22 multifaceted northwest Pennsylvania 23 safety and communication facility 4,000,000 24 (D) CONSTRUCTION, INFRASTRUCTURE AND OTHER <-- 25 RELATED COSTS FOR THE DEVELOPMENT OF 26 THE WARNER THEATER 15,000,000 27 (iii) City of Corry 28 (A) Acquisition, construction and 29 redevelopment of an industrial facility 30 and surrounding property, including 20050H2317B3325 - 76 -
1 abatement of hazardous materials 2,000,000
2 (26) Fayette County
3 (i) County projects (Reserved)
4 (ii) Dunbar Township
5 (A) Acquisition, construction,
6 infrastructure and other related costs
7 for the Fayette County Fairgrounds and
8 farm agency offices 750,000
9 (27) Forest County (Reserved)
10 (28) Franklin County (Reserved) <--
11 (28) FRANKLIN COUNTY <--
12 (I) COUNTY PROJECTS
13 (A) CONSTRUCTION OF A MUSEUM HONORING
14 PENNSYLVANIA'S FOREST FIRE HERITAGE,
15 INCLUDING ACQUISITION AND RELATED
16 INFRASTRUCTURE 5,000,000
17 (II) ANTRIM TOWNSHIP
18 (A) CONSTRUCTION OF A MUNICIPAL GOVERNMENT
19 FACILITY WHICH WILL ENCOMPASS TOWNSHIP
20 SERVICES 3,000,000
21 (B) CONSTRUCTION OF INFRASTRUCTURE RELATED
22 TO SOUTH ANTRIM BUSINESS CENTER,
23 INCLUDING A ROADWAY AND WATER AND SEWER
24 INFRASTRUCTURE 2,600,000
25 (III) CHAMBERSBURG BOROUGH
26 (A) RENOVATION AND CONSTRUCTION OF THE
27 CHAMBERSBURG HOSPITAL BED TOWER. THIS
28 AUTHORIZATION INCLUDES NECESSARY COSTS
29 RELATED TO ACQUISITION AND
30 INFRASTRUCTURE. 32,000,000
20050H2317B3325 - 77 -
1 (IV) WAYNESBORO BOROUGH 2 (A) CONSTRUCTION OF A FREESTANDING 3 OUTPATIENT SERVICES CENTER FOR 4 LABORATORY, RADIOGRAPHY, PREADMISSION 5 TESTING, MAMMOGRAPHY AND ADMINISTRATIVE 6 SERVICES. THIS AUTHORIZATION INCLUDES 7 NECESSARY COSTS RELATED TO ACQUISITION 8 AND INFRASTRUCTURE. 12,350,000 9 (29) Fulton County 10 (i) County projects (Reserved) 11 (ii) Fulton Industrial Development Association 12 (A) Construction of a multitenant complex 13 to house commercial and nonprofit 14 entities 1,000,000 15 (B) Development of the Fulton County 16 Business Park 1,000,000 17 (30) Greene County 18 (i) County projects 19 (A) Acquisition, construction and 20 infrastructure improvements and other 21 related costs for an economic and 22 community development project 5,000,000 23 (ii) Franklin Township 24 (A) Construction and other related costs 25 for the expansion of the Greene County 26 Prison 1,600,000 27 (B) Acquisition, construction, 28 infrastructure, abatement and other 29 related costs for the Curry Technology 30 Center 1,400,000 20050H2317B3325 - 78 -
1 (C) Rehabilitation, reconstruction, 2 environmental remediation and other 3 improvements to convert the former 4 Curry Memorial Home into the Curry 5 Technology Center for incubating small 6 businesses 1,400,000 7 (D) Construction of a second housing unit 8 and expansion of the Greene County 9 Prison 1,600,000 10 (iii) Washington Township 11 (A) Acquisition, construction, 12 infrastructure and other related costs 13 to develop a coal miner training 14 school 4,300,000 15 (31) Huntingdon County 16 (i) County projects (Reserved) 17 (ii) Huntingdon Borough 18 (A) Expansion and construction of the 19 Beeghly Library at Juniata College 10,000,000 20 (B) Construction and expansion of the 21 Raystown Field Station to provide a 22 learning environment for students and 23 teachers 4,200,000 24 (C) Expansion of the Juniata College 25 Center for Entrepreneurial Leadership, 26 including construction 2,500,000 27 (32) Indiana County 28 (i) County projects 29 (A) Development of a business and 30 industrial park, including acquisition, 20050H2317B3325 - 79 -
1 construction, improvements to an access 2 road and related infrastructure 3,000,000 3 (B) Expansion of business districts and 4 industrial parks within Indiana County 5 for the development of fiber-optic 6 communication and digital 7 telecommunications capability, 8 including engineering and construction 7,000,000 9 (C) Acquisition of blighted land in 10 Indiana County, including demolition, 11 environmental remediation and 12 construction of public infrastructure 8,500,000 13 (D) Construction of a multipurpose 14 business facility located in a Keystone 15 Opportunity Expansion Zone in Indiana 16 County Commerce Park, including site 17 preparation and related infrastructure 4,000,000 18 (E) Construction of a multitenant facility 19 located in a Keystone Opportunity 20 Improvement Zone in Burrell Township, 21 including acquisition, site 22 preparation, infrastructure 23 improvements and costs related to 24 architecture and engineering 3,000,000 25 (F) Construction of a multitenant 26 commercial facility located in a 27 Keystone Opportunity Expansion Zone in 28 Center Township, including acquisition, 29 site preparation and related 30 infrastructure 3,000,000 20050H2317B3325 - 80 -
1 (G) Construction of a multitenant 2 commercial facility located in a 3 Keystone Opportunity Expansion Zone in 4 Center Township, including acquisition, 5 site preparation AND infrastructure 5,000,000 <-- 6 (H) Acquisition and redevelopment of a 7 facility near Clymer Borough, including 8 site preparation, infrastructure 9 improvements, construction and costs 10 related to architecture and 11 engineering 3,000,000 12 (33) Jefferson County 13 (i) County projects (Reserved) 14 (ii) Somerset County Redevelopment Authority 15 (A) Improvements to property at Route 31 16 and Gardner Road including construction 17 and related infrastructure 6,000,000 18 (34) Juniata County (Reserved) 19 (35) Lackawanna County 20 (i) County projects (Reserved) 21 (ii) City of Carbondale 22 (A) Acquisition, construction, 23 infrastructure and other related costs 24 to revitalize the Greater Carbondale 25 YMCA 2,000,000 26 (iii) City of Scranton 27 (A) South Scranton revitalization project 500,000 28 (B) Acquisition, construction and 29 infrastructure improvements and other 30 related costs for an economic and 20050H2317B3325 - 81 -
1 community development project 5,000,000 2 (36) Lancaster County 3 (i) County projects 4 (A) Demolition, environmental remediation 5 and infrastructure development for 6 Northwest Gateway Development Project 10,000,000 7 (B) Expansion of the Schreiber Pediatric 8 Rehab Center of Lancaster County, 9 including construction 1,250,000 10 (C) EXPANSION OF THE PHILHAVEN FACILITIES <-- 11 FOR AUTISM 5,000,000 12 (ii) City of Lancaster 13 (A) Acquisition, construction and 14 infrastructure improvements and other 15 related costs for an economic and 16 community development project 5,000,000 17 (B) Construction, infrastructure and other 18 related costs to expand Spanish- 19 American Civic Association facilities 20 including a family center and the annex 21 building 1,000,000 22 (C) Construction, infrastructure and other 23 related costs for the renovation of the 24 Crispus Attucks Community Center 1,500,000 25 (D) Construction, infrastructure and other 26 related costs for the redevelopment of 27 the East King Street corridor including 28 parking needs 2,500,000 29 (E) Construction, infrastructure and other 30 related costs for the expansion and 20050H2317B3325 - 82 -
1 improvement of the Brightside 2 Opportunity Center 500,000 3 (F) Construction, infrastructure and other 4 related costs for the restoration and 5 preservation of the historic Watt & 6 Shand building facade 3,000,000 7 (G) Construction, infrastructure and other 8 related costs for the Demuth Museum 9 Expansion Project 2,000,000 10 (H) Construction, infrastructure and other 11 related costs for a Latino cultural 12 center 500,000 13 (I) Construction, infrastructure and other 14 related costs to enhance Thaddeus 15 Stevens College of Technology 16 facilities 4,000,000 17 (iii) Conoy Township 18 (A) Acquisition, redevelopment and 19 construction of the Haldeman Mansion 20 and out buildings, including 21 infrastructure for public use 3,300,000 22 (iv) Elizabethtown Borough 23 (A) Renovation of the GEARS Community 24 Center, including construction 725,000 25 (v) Ephrata Borough 26 (A) Expansion of the Ephrata Community 27 Hospital Cancer Center, including 28 construction 500,000 29 (vi) Manheim Township 30 (A) For construction of the Overlook 20050H2317B3325 - 83 -
1 Library and Community Center 3,000,000 2 (vii) Millersville Borough 3 (A) Acquisition and redevelopment of the 4 former Borough Water Pumping Station as 5 an emergency services facility 500,000 6 (B) Acquisition and construction of a new 7 municipal building facility 1,800,000 8 (37) Lawrence County 9 (i) County projects 10 (A) Construction and related costs for the 11 Ellwood City Hospital expansion 10,000,000 12 (B) Acquisition, site development and 13 infrastructure improvements related to 14 the railroad corridor development 20,000,000 15 (C) Acquisition, site development, 16 infrastructure and construction costs 17 for a mixed-use facility 3,000,000 18 (ii) New Castle Borough 19 (A) Acquisition, site development, 20 infrastructure and construction to 21 redevelop Southside New Castle 2,000,000 22 (iii) Taylor Township 23 (A) Construction and other related costs 24 for the West Pittsburg Train Station 1,000,000 25 (38) Lebanon County (Reserved) 26 (39) Lehigh County 27 (i) County projects 28 (A) Redevelopment of J. Birney Crum 29 Stadium 1,000,000 30 (ii) City of Allentown 20050H2317B3325 - 84 -
1 (A) Expansion of the Allentown campus of 2 St. Luke's Hospital, including 3 construction 5,000,000 4 (B) St. Luke's Hospital and Health 5 Network/Visiting Nurse Association of 6 St. Luke's, including construction of a 7 new hospice house 500,000 8 (C) Redevelopment and renovation of Good 9 Shepherd Hospital, including 10 acquisition and construction 21,000,000 11 (D) Allentown Art Museum, for expansion 12 and modernization of the museum 13 facility, including construction and 14 related infrastructure 1,000,000 15 (E) Renovation of Sacred Heart Hospital, 16 including construction 500,000 17 (F) Renovation and systems upgrade of the 18 Allentown YMCA/YWCA 2,000,000 19 (iii) Center Valley 20 (A) For construction of the Gambet Center 21 at DeSales University 4,000,000 22 (iv) Emmaus Borough 23 (A) Construction of a new police facility 24 for the Emmaus Police Department 500,000 25 (v) Salisbury Township 26 (A) Lehigh Valley Hospital and Health 27 Network, expansion of burn center 28 including construction 1,000,000 29 (vi) Slatington Borough 30 (A) Renovation of the municipal and fire 20050H2317B3325 - 85 -
1 buildings, including construction 500,000 2 (B) Acquisition of land to develop a 3 recreational area 500,000 4 (vii) Washington Township 5 (A) Construction of an addition to the 6 municipal building 500,000 7 (40) Luzerne County 8 (i) County projects 9 (A) Construction, infrastructure and 10 related costs for improving the Whitney 11 Point Industrial Park 2,000,000 12 (B) Acquisition, construction and 13 infrastructure improvements and other 14 related costs for an economic and 15 community development project 5,000,000 16 (C) Construction and related costs 17 associated for the Junior Achievement 18 business and enterprise center 1,600,000 19 (D) Construction and related costs for the 20 redevelopment of downtown Edwardsville 21 Borough 1,000,000 22 (ii) Ashley Borough 23 (A) Restoration of Huber Breaker 5,000,000 24 (iii) City of Nanticoke 25 (A) Construction, infrastructure, site 26 improvement and other costs related to 27 the development of the Lower Broadway 28 Recreation Complex 1,000,000 29 (iv) City of Wilkes-Barre 30 (A) Selective demolition, renovation, 20050H2317B3325 - 86 -
1 construction, environmental remediation 2 and infrastructure improvements of 3 blighted industrial site into mixed-use 4 facility, Murray Complex, Pennsylvania 5 Avenue 10,000,000 6 (B) South Main Street mixed-use project 5,000,000 7 (C) Construction and infrastructure 8 improvements to downtown parking deck 4,000,000 9 (D) Revitalization, reconstruction and 10 construction of the river commons, 11 riverfront and access to the 12 Susquehanna River 15,000,000 13 (E) Rehabilitation and infrastructure 14 improvement of the historic Sterling 15 Annex Building, Museum of the 16 Susquehanna 4,000,000 17 (F) Rehabilitation, expansion, 18 infrastructure improvement and 19 environmental remediation of historic 20 Shriner's Hall 20,000,000 21 (G) Rehabilitation, infrastructure 22 improvements and environmental 23 remediation of historic railroad 24 station property, Market Street Square 5,000,000 25 (H) Acquisition, demolition, renovation, 26 environmental remediation, 27 infrastructure development and 28 construction of blighted and abandoned 29 industrial site along Courtwright 30 Street 5,000,000 20050H2317B3325 - 87 -
1 (I) Construction, infrastructure 2 development and environmental 3 remediation of medical arts/office 4 building, Coal Street Park 7,000,000 5 (J) Construction and infrastructure 6 improvement of downtown convention 7 headquarters hotel 15,000,000 8 (K) Renovation, construction and 9 infrastructure improvements of regional 10 Kirby Park along the Susquehanna River 750,000 11 (L) Construction and infrastructure 12 development, regional sports and 13 nutrition complex 8,000,000 14 (M) Acquisition, renovation, construction, 15 environmental remediation and 16 infrastructure improvements, including 17 construction of a regional arts center 18 and public green space, 100 Block South 19 Main Street redevelopment project 13,000,000 20 (N) Acquisition, renovation, 21 rehabilitation, construction, 22 environmental remediation and 23 infrastructure improvements, including 24 construction of existing and vacant 25 properties, first block South Main 26 Street, Phase II 10,000,000 27 (O) Renovation, construction and 28 infrastructure improvements of Public 29 Square 1,600,000 30 (v) Dallas Borough 20050H2317B3325 - 88 -
1 (A) Construction of a technology center 2,500,000
2 (41) Lycoming County
3 (i) County projects
4 (A) Construction of roads internal to the
5 Muncy Industrial Park Phase III 1,000,000
6 (B) Construction of water and sewer
7 infrastructure internal to the Muncy
8 Industrial Park Phase II 1,500,000
9 (C) Construction of new roads internal to
10 the Muncy Industrial Park Phase II 1,000,000
11 (D) Upgrade to the Jersey Shore Borough's
12 community sewer system, including
13 construction and related
14 infrastructure 2,500,000
15 (E) Construction of a Nippenose Township
16 community sewer system 1,500,000
17 (F) Design and construction of
18 infrastructure for Muncy Industrial
19 Park Phase III 2,000,000
20 (ii) Brady Township
21 (A) Design and construction of the Timber
22 Run Industrial Park infrastructure 2,000,000
23 (iii) Jersey Shore Borough
24 (A) Construction of an addition to the
25 Jersey Shore Hospital 2,000,000
26 (iv) Lycoming County Water and Sewer Authority
27 Facility <--
28 (A) Construction of a new water system for
29 Fairfield Tules Run Development area 3,000,000
30 (B) Construction of water and sewer
20050H2317B3325 - 89 -
1 infrastructure internal to the Muncy 2 Industrial Park Phase III 1,000,000 3 (C) Construction of a new water system for 4 Muncy Industrial Parks 2,000,000 5 (D) Construction of a new water system for 6 growth corridor surrounding Fairfield 7 business and industrial areas 3,000,000 8 (E) Construction of a new water system for 9 a Keystone Opportunity Zone and 10 commercial growth areas surrounding 11 Lycoming Mall Interchange 2,000,000 12 (F) Lycoming County Water and Sewer 13 Authority, construction of a new 14 community sewer system 2,000,000 15 (v) City of Williamsport 16 (A) Expansion of the Williamsport Hospital 17 and Medical Center Campus into a 18 regional complex and expansion of the 19 Muncy Valley Hospital and the Divine 20 Providence Hospital, as well as other 21 health care facilities, including 22 acquisition, construction, 23 redevelopment and related 24 infrastructure 20,000,000 25 (B) Expansion of the James V. Brown 26 Library 1,000,000 27 (C) Acquisition of a large service 28 facility to serve MH/MR clients 2,000,000 29 (D) Construction of the Center for 30 Business and Workforce Development at 20050H2317B3325 - 90 -
1 the Pennsylvania College of Technology 1,000,000 2 (42) McKean County 3 (i) County projects (Reserved) 4 (ii) City of Bradford 5 (A) Impact Bradford II, acquisition, 6 construction, redevelopment and related 7 infrastructure 7,500,000 8 (43) Mercer County (Reserved) 9 (44) Mifflin County (Reserved) 10 (45) Monroe County 11 (i) County projects (Reserved) 12 (ii) Smithfield Township 13 (A) Acquisition, construction, 14 infrastructure and related costs for 15 the Penn Regional Business Center 11,000,000 16 (46) Montgomery County 17 (i) County projects 18 (A) Construction and related costs for the 19 Upper Merion Middle School community 20 recreation facilities 3,600,000 21 (B) Expansion and construction of 22 buildings at Montgomery County Farm 23 Park 1,000,000 24 (C) CONSTRUCTION AND OTHER RELATED COSTS <-- 25 TO EXPAND THE HOLY REDEEMER HOSPITAL 26 EMERGENCY ROOM 3,500,000 27 (ii) Abington Township 28 (A) Construction and other related costs <-- 29 to expand the Holy Redeemer Hospital 30 emergency room 3,500,000 20050H2317B3325 - 91 -
1 (B) (A) Construction and other related <-- 2 costs to upgrade the Manor Junior 3 College dental center 500,000 4 (C) (B) Emergency department renovation <-- 5 and construction for the Holy Redeemer 6 Health System 3,500,000 7 (iii) Cheltenham Township 8 (A) Acquisition, construction and other 9 related costs to expand the Mobility 10 Rehabilitation Research Center 2,000,000 11 (B) Construction of the Mobility 12 Rehabilitation Research Center 2,000,000 13 (C) Restoration, construction and 14 infrastructure improvements of African- 15 American Soldiers Civil War Museum 500,000 16 (iv) Green Lane Borough 17 (A) Acquisition and construction of a 18 building for borough services 500,000 19 (v) Franconia Township 20 (A) Acquisition of land and construction 21 of a new secondary school 9,500,000 22 (vi) Hatboro Borough 23 (A) Enterprise Fire Company of Hatboro, 24 construction of a new firehouse 1,500,000 25 (vii) Lower Gwynedd Township 26 (A) Construction of a new facility on the 27 campus of Gwynedd-Mercy College to 28 enhance learning and community service 11,000,000 29 (viii) Montgomery County Industrial 30 Development Corporation 20050H2317B3325 - 92 -
1 (A) Redevelopment of the Keasbey and 2 Mattison Boiler House as a commercial 3 building 5,500,000 4 (ix) Pennsburg Borough 5 (A) Expansion of the St. Luke's Hospital 6 and Health Network, including 7 outpatient facilities, operating room, 8 dialysis facilities and emergency 9 vehicle storage 5,000,000 10 (x) Springfield Township 11 (A) Keystone House Project Phase II and 12 Phase III. This project shall be 13 construed as a supplement to the 14 project authorized in section 15 6(46)(iv)(B) of the act of June 22, 16 2004 (P.L.257, No.40), known as the 17 Capital Budget Project Itemization Act 18 of 2003-2004. 1,000,000 19 (xi) Upper Merion Township 20 (A) Construction, infrastructure and other 21 related costs for the Village of Valley 22 Forge 50,000,000 23 (xii) Upper Moreland Township 24 (A) Redevelopment of the Willow Grove 25 area, including acquisition, 26 construction and related 27 infrastructure 5,000,000 28 (xiii) Whitemarsh and Whitpain Townships 29 (A) Acquisition, construction, 30 infrastructure improvements and other 20050H2317B3325 - 93 -
1 related costs for an economic and 2 community development project 1,000,000 3 (xiv) Whitpain Township 4 (A) Acquisition, construction and 5 redevelopment of abandoned commercial 6 property, Butler Pike and Skippack 7 Pike 500,000 8 (47) Montour County (Reserved) 9 (48) Northampton County 10 (i) County projects 11 (A) Acquisition, construction, 12 infrastructure and related costs for 13 the Northampton County Baseball 14 Stadium 500,000 15 (B) CONSTRUCTION OF THE SLATE BELT COUNCIL <-- 16 OF GOVERNMENTS POLICE COMPLEX 1,500,000 17 (C) CONSTRUCTION OF THE COLONIAL REGIONAL 18 POLICE COMPLEX 3,000,000 19 (ii) City of Bethlehem 20 (A) Construction, infrastructure and 21 abatement of hazardous materials and 22 related costs for Eastern Wood 23 Products 5,000,000 24 (B) Acquisition, construction, 25 infrastructure and other related costs 26 for a wood products 27 fabrication/warehouse/storage facility 28 located on a brownfield site 5,000,000 29 (C) Construction, infrastructure and other 30 related costs for a science and 20050H2317B3325 - 94 -
1 technology building at Lehigh 2 University 10,000,000 3 (iii) City of Easton 4 (A) Rehabilitation and expansion of the 5 former Social Security building for 6 Project of Easton 500,000 7 (iv) Bethlehem Township 8 (A) Construction of a health village 9 related to St. Luke's Hospital to 10 include community and specialty 11 hospitals, medical office buildings, 12 other health care facilities and 13 educational facilities and related 14 infrastructure 22,000,000 15 (B) Construction of a building to house 16 medical offices, emergency center, 17 radiology labs, cancer center and other 18 health care units 15,000,000 19 (49) Northumberland County 20 (i) County projects (Reserved) 21 (ii) Lewis Township 22 (A) Construction of a new municipal 23 building 500,000 24 (iii) Lower Mahanoy Township 25 (A) Expansion of municipal building, 26 including construction 500,000 27 (iv) Point Township 28 (A) Expansion of municipal building, 29 including construction 500,000 30 (v) Upper Mahanoy Township 20050H2317B3325 - 95 -
1 (A) Expansion of municipal building, 2 including construction 500,000 3 (VI) CITY OF SUNBURY <-- 4 (A) REDEVELOPMENT OF THE RIVERFRONT, 5 INCLUDING CONSTRUCTION AND OTHER 6 RELATED COSTS 10,000,000 7 (50) Perry County (Reserved) 8 (51) Philadelphia County 9 (i) City of Philadelphia 10 (A) Acquisition, construction, 11 infrastructure and related costs for 12 expanding the Maria de los Santos 13 Health Center 1,000,000 14 (B) Construction, infrastructure and other 15 related costs for the redevelopment of 16 the Youth Entrepreneurship Mall and 17 shopping center 1,000,000 18 (C) Acquisition, construction, 19 infrastructure improvements and other 20 related costs for an economic and 21 community development project 5,000,000 22 (D) Redevelopment of the Uptown Theater 2,750,000 23 (E) Redevelopment of the Waterview 24 Recreation Center and surrounding 25 recreation area 2,000,000 26 (F) Construction and related costs for the 27 renovation of the Fishtown Recreation 28 Complex including the Miles Lederer 29 Pool 1,500,000 30 (G) Construction and related costs for the 20050H2317B3325 - 96 -
1 renovation of Methodist Family Services 2 facilities 2,000,000 3 (H) Construction and related costs for the 4 South Street improvement project 1,500,000 5 (I) Acquisition, construction, 6 infrastructure and related costs to 7 develop the Paradise Island Child 8 Center 1,500,000 9 (J) Construction, infrastructure and 10 related costs for the Cyber Village 11 development project 2,000,000 12 (K) Construction, infrastructure and other 13 related costs for the Friends Co-op 14 redevelopment project 500,000 15 (L) Construction and related costs for the 16 redevelopment of ASPIRA 2,500,000 17 (M) Acquisition, construction and other 18 related costs to expand the Germantown 19 Community Health Services 1,300,000 20 (N) Construction, infrastructure and 21 related costs to develop the Hunting 22 Park recreation complex 1,000,000 23 (O) Acquisition, construction and other 24 related costs to expand the Albert 25 Einstein Medical Center 5,000,000 26 (P) Acquisition, construction, 27 infrastructure and other related costs 28 to expand the Masonic Hall on North 29 Broad Street, including a community 30 center and banquet hall 2,000,000 20050H2317B3325 - 97 -
1 (Q) Construction of an ambulatory care 2 center at Tenth and Sansom Streets 10,000,000 3 (R) Construction of a medical education 4 building and parking facility on the 5 north side of Locust Street, between 6 Tenth and Eleventh Streets 30,000,000 7 (S) Acquisition, construction, 8 infrastructure and other related costs 9 to renovate Interim House 2,000,000 10 (T) Construction, infrastructure and other 11 related costs to redevelop Lower Venice 12 Island 3,500,000 13 (U) Acquisition, construction, 14 infrastructure and other related costs 15 for a community recreation center at 16 Tenth and Pike Streets 5,500,000 17 (V) The Torresdale Avenue Revitalization 18 Project 1,000,000 19 (W) Construction of the First Responders 20 and Allied Health Professional Learning 21 and Training Center 1,300,000 22 (X) Construction of the Academic and 23 Medical Teaching Center, Albert 24 Einstein Medical Center 5,000,000 25 (Y) Rehabilitation of the environmental 26 education center, including 27 revitalization, flood control, 28 construction of walking path, bridges 29 and entertainment venues and other 30 improvements to the Pleasant Hill Park 1,000,000 20050H2317B3325 - 98 -
1 (Z) Construction, infrastructure and other 2 related costs for the Maria de los 3 Santos Health Center 1,000,000 4 (AA) Construction, infrastructure and 5 other related costs for Robin Hood Dell 6 East 500,000 7 (BB) Acquisition, construction, 8 infrastructure and other related costs 9 for the Lancaster Avenue Corridor 10 Revitalization Project 2,000,000 11 (CC) Construction, infrastructure and 12 other related costs for Hunting Park 13 Ball Field and Recreation Center 1,000,000 14 (DD) Acquisition, construction, 15 infrastructure and other related costs 16 for the Paradise Island Child Care 17 Center 1,500,000 18 (EE) Construction, infrastructure and 19 other related costs for the Youth 20 Entrepreneurial Mall and Shopping 21 Center 1,000,000 22 (FF) Acquisition, construction, 23 infrastructure and other related costs 24 for a preliminary land development and 25 revitalization plan 500,000 26 (GG) Construction, infrastructure and 27 other related costs for Lower Venice 28 Island Park 3,500,000 29 (HH) Construction, infrastructure and 30 other related costs to modernize a 20050H2317B3325 - 99 -
1 publicly owned natural gas utilities 2 system in cities of the first class 200,000,000 3 (II) Expansion of the Holy Family 4 University School of Business, 5 including construction 5,000,000 6 (JJ) Expansion and construction of the 7 Cardiac Center, the NICU and 8 construction of the new 9 radiology/imaging center and new 10 fetal/special delivery unit 10,000,000 11 (KK) Construction and redevelopment of the 12 Eden Hall Chapel, in order to establish 13 a school and/or other programs for 14 autistic and special needs children 2,000,000 15 (LL) Expansion of the Science Center, 3701 16 Market Street, including construction 2,200,000 17 (MM) Expansion of the Morris Arboretum at 18 the University of Pennsylvania 12,000,000 19 (NN) Renovation of the Mann Center for the 20 Performing Arts 2,500,000 21 (OO) Construction of a community center on 22 the Abraham Lincoln High School campus 1,200,000 23 (PP) Redevelopment of the Devon Theatre of 24 Performing Arts, including related 25 infrastructure 700,000 26 (QQ) Construction of the Nazareth Academy 27 High School Performing Arts Center 4,000,000 28 (RR) CONSTRUCTION OF FACILITIES AT <-- 29 PHILADELPHIA UNIVERSITY. THIS 30 AUTHORIZATION INCLUDES NECESSARY FUNDS 20050H2317B3325 - 100 -
1 FOR EXPANSION AND OTHER RELATED COSTS. 5,000,000 2 (SS) CONSTRUCTION OF SACRED HEART HOSPITAL 3 FACILITIES. THIS AUTHORIZATION INCLUDES 4 NECESSARY FUNDS FOR EXPANSION AND OTHER 5 RELATED COSTS. 2,500,000 6 (ii) County projects 7 (A) Renovation of an existing building at 8 the Northern Home for Children and 9 Family Services, including demolition 10 and construction 5,000,000 11 (B) Expansion of the Evangelical Manor 12 Campus, including construction 7,750,000 13 (C) Expansion and construction of a 14 facility to house elephants 11,000,000 15 (D) Construction of the Chinatown 16 Community Center 5,000,000 17 (E) Construction and other related costs 18 to expand Berean Institute 8,000,000 19 (F) Construction, infrastructure and other 20 related costs for Memorial Hall 7,500,000 21 (G) ACQUISITION, CONSTRUCTION, <-- 22 INFRASTRUCTURE AND OTHER RELATED COSTS 23 FOR THE LANCASTER AVENUE CORRIDOR 24 REVITALIZATION PROJECT PHASE 5 500,000 25 (52) Pike County 26 (i) County projects (Reserved) 27 (ii) Milford Borough 28 (A) Construction, infrastructure and other 29 related costs for the Pike County 30 Public Library 2,000,000 20050H2317B3325 - 101 -
1 (53) Potter County (Reserved) 2 (54) Schuylkill County 3 (i) County projects (Reserved) 4 (ii) City of Pottsville 5 (A) Preparation and construction of the 6 Union Station site in downtown 7 Pottsville 6,000,000 8 (iii) Coaldale Borough 9 (A) Renovation of emergency rooms, 10 radiology labs and surgical center at 11 St. Luke's Miner's Memorial Hospital 5,000,000 12 (iv) McAdoo Borough 13 (A) Downtown Streetscape improvements 500,000 14 (v) Rush Township 15 (A) Expansion of an Air Products 16 Industrial Park 1,200,000 17 (B) Expansion of the Tidewood East 18 Industrial Park, including 19 infrastructure 1,000,000 20 (vi) Tamaqua Borough 21 (A) Construction of a river park and river 22 walk 500,000 23 (55) Snyder County (Reserved) 24 (56) Somerset County 25 (i) County projects 26 (A) Land acquisition, site preparation, 27 infrastructure development, design and 28 construction of a visitors' center and 29 memorial for Flight 93 10,000,000 30 (B) Somerset Hospital for construction and 20050H2317B3325 - 102 -
1 redevelopment of a four-square-block 2 area encompassing the hospital facility 3 and surrounding area as a health care 4 campus 500,000 5 (C) Quemahoning Township water pipeline 6 project, including Conemaugh, Jenner, 7 Lincoln and Somerset Townships and 8 Boswell and Somerset Boroughs, 9 infrastructure development for the 10 Somerset Industrial Park and the 11 Northstar Business Park 22,000,000 12 (D) Laurel Highlands Business Park, for 13 acquisition and construction of 14 facilities to accommodate light- 15 industrial and technology-based 16 commerce 5,000,000 17 (ii) Windber Borough 18 (A) Acquisition, construction, 19 infrastructure and other related costs 20 for a biotechnology center 6,000,000 21 (B) Acquisition, construction, 22 infrastructure and other related costs 23 for a data fusion and storage center 10,000,000 24 (57) Sullivan County (Reserved) 25 (58) Susquehanna County 26 (i) County projects (Reserved) 27 (ii) Montrose Borough 28 (A) Expansion of The Center for Anti- 29 Slavery Studies 2,000,000 30 (59) Tioga County 20050H2317B3325 - 103 -
1 (i) County projects 2 (A) Environmental remediation for the 3 Tioga River 9,300,000 4 (60) Union County (Reserved) 5 (61) Venango County 6 (i) County projects 7 (A) Enviro Biodiesel, construction of an 8 alternative fuel processing plant 9 located on a brownfield site 15,000,000 10 (ii) Rouseville Borough 11 (A) Construction of an alternative fuel 12 processing plant on the Pennzoil 13 refinery site 15,000,000 14 (62) Warren County 15 (i) County projects 16 (A) Construction of a facility to house 17 the Warren/Forest Higher Education 18 Council, including necessary costs 19 associated with acquisition and 20 infrastructure 2,000,000 21 (ii) City of Warren 22 (A) Construction of the Warren County 23 Geospatial Information Service 24 facility 500,000 25 (63) Washington County 26 (i) County projects 27 (A) Construction and related costs for the 28 renovation of the Meadowcroft 29 Rockshelter and Museum of Rural Life 500,000 30 (B) Construction, infrastructure and other 20050H2317B3325 - 104 -
1 related costs for the Pony Baseball 2 Field renovation 1,000,000 3 (C) Acquisition, demolition, construction 4 and other related costs for the 5 construction of a parking garage 5,000,000 6 (ii) Burgettstown Borough 7 (A) Acquisition, construction, 8 infrastructure and other related costs 9 for the revitalization of the business 10 district 750,000 11 (iii) California Borough 12 (A) Acquisition, construction, 13 infrastructure and other related costs 14 for the expansion of the California 15 Technology Park 750,000 16 (iv) Fallowfield Township 17 (A) Construction, infrastructure and other 18 related costs for improvements to Alta 19 Vista Industrial Park 750,000 20 (v) Hanover Township 21 (A) Construction, site development, 22 infrastructure and other related costs 23 to redevelop the Starvaggi Property 5,000,000 24 (vi) North Strabane Township 25 (A) Acquisition, construction and other 26 related costs for the Greater 27 Washington County Food Bank 1,000,000 28 (vii) Peters Township 29 (A) Acquisition and construction of a 30 community center, including 20050H2317B3325 - 105 -
1 redevelopment and infrastructure 1,250,000 2 (64) Wayne County (Reserved) 3 (65) Westmoreland County 4 (i) County projects 5 (A) Acquisition, construction and other 6 related costs for the rehabilitation of 7 Youngwood Railroad Museum 1,000,000 8 (ii) City of Greensburg 9 (A) Construction and other related costs 10 for Phase II of the Seton Hall 11 University downtown project 3,000,000 12 (iii) Hempfield Township 13 (A) Development and construction of the 14 Westmoreland Office and Technology 15 Park 1,500,000 16 (iv) Latrobe Borough 17 (A) Construction, infrastructure and other 18 related costs for Latrobe downtown 19 revitalization 1,000,000 20 (v) Rector 21 (A) Expansion of the Florence Lockhart 22 Nimick Nature Center at Powdermill 23 Nature Reserve, including construction 1,500,000 24 (66) Wyoming County (Reserved) 25 (67) York County 26 (i) County projects 27 (A) Acquisition, construction, 28 infrastructure improvements and other 29 related costs for an economic and 30 community development project 5,000,000 20050H2317B3325 - 106 -
1 (ii) City of York
2 (A) Construction of a multipurpose
3 recreation facility 8,000,000
4 (B) Construction, infrastructure and
5 related costs to renovate and expand an
6 existing facility to increase the
7 number of laboratory and general
8 classrooms 5,000,000
9 (iii) Hopewell Township
10 (A) Acquisition of land and design and
11 construction of a new township
12 building 3,000,000
13 (iv) Lower Windsor Township
14 (A) Construction and design of a
15 recreation building This. THIS <--
16 authorization includes funds for costs
17 related to land acquisition if
18 necessary. 2,000,000
19 (B) Acquisition and construction of land
20 related to the Susquehanna Riverlands
21 Preservation Project 14,000,000
22 (v) Springettsbury Township
23 (A) Construction of the York Towne Center,
24 including related infrastructure 6,000,000
25 (VI) HANOVER BOROUGH AND PENN TOWNSHIP <--
26 (A) CONSTRUCTION OF A 1.5 MILE PORTION OF
27 THE YORK HANOVER TROLLEY LINE AS A
28 RECREATIONAL PATHWAY, INCLUDING RELATED
29 COSTS 500,000
30 Section 7. Itemization of flood control projects.
20050H2317B3325 - 107 -
1 Additional capital projects in the category of flood control 2 projects to be constructed by the Department of Environmental 3 Protection, its successors or assigns, and to be financed by the 4 incurring of debt are hereby itemized, together with their 5 respective estimated costs, as follows: 6 Total 7 Project 8 Project Allocation 9 (1) Department of Environmental Protection 10 (i) Clearfield County 11 (A) Coalport flood control project, 12 including costs for stream channel 13 clearing and restoration related to DGS 14 182-14 4,000,000 15 (B) Curwensville flood control project, 16 including costs for stream channel 17 clearing and restoration 4,000,000 18 (ii) Delaware County 19 (A) Construction of shields to secure, 20 stabilize and protect six exposed 21 sanitary sewer pipes along Darby and 22 Crum Creeks and their tributaries 750,000 23 (iii) Lehigh County 24 (A) Construction of flood mitigation for 25 Spring Creek, Swabin Creek and the 26 Little Lehigh Creek within the Little 27 Lehigh Creek Watershed 10,000,000 28 (iv) Lycoming County 29 (A) Augment Lycoming County's flood 30 warning system with the addition of 20050H2317B3325 - 108 -
1 rain gauges on five creeks to add 2 additional warning and protection time 500,000 3 (B) Structural changes to culvert at 4 confluence of Susquehanna River and 5 Louschy Run including construction 1,000,000 6 (v) Monroe County 7 (A) Engineering and construction related 8 to dam replacement at Stillwater Lake 2,500,000 9 (vi) Northumberland County 10 (A) Acquisition, construction, 11 infrastructure and other related costs 12 for Shamokin Creek flood control in Mt. 13 Carmel Borough 14,000,000 14 (B) Acquisition, construction, 15 infrastructure and other related costs 16 for Butternut Creek flood control in 17 Mt. Carmel Township 6,000,000 18 (vii) Warren County 19 (A) Jackson Run flood mitigation 500,000 20 Section 8. Itemization of Keystone Recreation, Park and 21 Conservation Fund projects. 22 Projects in the category of public improvement projects to be 23 constructed by the Department of Conservation and Natural 24 Resources, its successors or assigns and to be financed by 25 current revenues of the Keystone Recreation, Park and 26 Conservation Fund are hereby itemized, together with their 27 respective estimated costs, as follows: 28 Total 29 Project 30 Project Allocation 20050H2317B3325 - 109 -
1 (1) Department of Conservation and Natural 2 Resources 3 (i) Bald Eagle State Park 4 (A) Rehabilitate grit chamber 300,000 5 (Base Project Allocation - $300,000) 6 (B) Replace courtesy desks at eight public 7 boat landings 300,000 8 (Base Project Allocation - $300,000) 9 (ii) Delaware Canal State Park 10 (A) Rehabilitate Lumberville wall 1,000,000 11 (Base Project Allocation - $1,000,000) 12 (B) Refurbish Route 13 bridge 1,000,000 13 (Base Project Allocation - $1,000,000) 14 (iii) Forest District 18 15 (A) Renovate Haldeman House 500,000 16 (Base Project Allocation - $500,000) 17 (iv) Kettle Creek State Park 18 (A) Modernize lower campground sewage 19 system 600,000 20 (Base Project Allocation - $600,000) 21 (v) Parker Dam State Park 22 (A) Modernize campground restrooms 300,000 23 (Base Project Allocation - $300,000) 24 (B) Repair and rehabilitate dam spillway 300,000 25 (Base Project Allocation - $300,000) 26 (vi) Patterson State Park 27 (A) Replace unisex restroom with modern 28 facilities 300,000 29 (Base Project Allocation - $300,000) 30 (vii) Raymond B. Winter State Park 20050H2317B3325 - 110 -
1 (A) Renovate bridge 300,000 2 (Base Project Allocation - $300,000) 3 (viii) Reeds Gap State Park 4 (A) Replace and upgrade dump station 300,000 5 (Base Project Allocation - $300,000) 6 (ix) Sinnemahoning State Park 7 (A) Upgrade and rehabilitate three bridges 8 with box culverts 300,000 9 (Base Project Allocation - $300,000) 10 (x) Sizerville State Park 11 (A) Replace pit latrines with modern 12 facilities and remove office within the 13 park 900,000 14 (Base Project Allocation - $900,000) 15 (xi) Various parks, Statewide 16 (A) Acquire land to be incorporated within 17 the park and forestry system according 18 to the Commonwealth's master plan 10,000,000 19 (Land Allocation - $10,000,000) 20 Section 9. Itemization of Environmental Stewardship Fund 21 projects. 22 Projects in the category of public improvement projects to be 23 constructed by the Department of Conservation and Natural 24 Resources, its successors or assigns and to be financed by 25 current revenues of the Environmental Stewardship Fund are 26 hereby itemized together with their respective estimated 27 financial costs as follows: 28 Total 29 Project 30 Project Allocation 20050H2317B3325 - 111 -
1 (1) Department of Conservation and Natural 2 Resources 3 (i) Beltzville State Park 4 (A) Rehabilitate sewage treatment plant 5 and correct infiltration 250,000 6 (Base Project Allocation - $250,000) 7 (ii) Black Moshannon State Park 8 (A) Repair and rehabilitate dam spillway 300,000 9 (Base Project Allocation - $300,000) 10 (iii) Delaware Canal State Park 11 (A) Refurbish Route 13 bridge 1,500,000 12 (Base Project Allocation - $1,500,000) 13 (iv) Evansburg State Park 14 (A) Replace temporary restrooms with 15 permanent modern facilities 250,000 16 (Base Project Allocation - $250,000) 17 (v) Forest District 18 18 (A) Rehabilitate Roaring Creek creekbed 19 along Route 42 500,000 20 (Base Project Allocation - $500,000) 21 (B) Rehabilitate Roaring Creek creekbed 22 along Route 54 500,000 23 (Base Project Allocation - $500,000) 24 (vi) Leonard Harrison State Park 25 (A) Construct addition to visitors center 26 with restrooms, classroom facility and 27 office 300,000 28 (Base Project Allocation - $300,000) 29 (vii) Reeds Gap State Park 30 (A) Rehabilitate shower house for camping 20050H2317B3325 - 112 -
1 area 500,000 2 (Base Project Allocation - $500,000) 3 (viii) Ridley Creek State Park 4 (A) Reroof maintenance building 300,000 5 (Base Project Allocation - $300,000) 6 (ix) Shikellamy State Park 7 (A) Rehabilitate marina buildings 600,000 8 (Base Project Allocation - $600,000) 9 (x) Various parks, Statewide 10 (A) Acquire land to be incorporated within 11 the park and forestry system according 12 to the Commonwealth's master plan 10,000,000 13 (Land Allocation - $10,000,000) 14 Section 10. Itemization of Motor License Fund projects. 15 The individual capital projects in the category of public 16 improvement projects to be developed by the Department of 17 General Services, its successors or assigns, for the Department 18 of Transportation, and to be financed by the incurring of debt 19 or from current revenues in the Motor License Fund are hereby 20 itemized together with their respective itemized costs as 21 follows: 22 Total 23 Project 24 Project Allocation 25 (1) Department of Transportation 26 (i) County maintenance facility, Adams County 27 (A) Construct or acquire new county 28 maintenance facility 13,800,000 29 (Base Project Allocation - $11,000,000) 30 (Land Allocation - $1,000,000) 20050H2317B3325 - 113 -
1 (Design and Contingencies - $1,800,000) 2 (ii) County maintenance facility, Butler 3 County 4 (A) Construct or acquire new county 5 maintenance facility 13,800,000 6 (Base Project Allocation - $11,000,000) 7 (Land Allocation - $1,000,000) 8 (Design and Contingencies - $1,800,000) 9 (iii) Welcome Center, Delaware County 10 (A) Renovate and expand existing 11 facilities at I-95 Welcome Center and 12 RSR Site N 9,775,000 13 (Base Project Allocation - $8,500,000) 14 (Design and Contingencies - $1,275,000) 15 (iv) County maintenance facility, Lehigh 16 County 17 (A) Construct or acquire new county 18 maintenance facility 13,800,000 19 (Base Project Allocation - $11,000,000) 20 (Land Allocation - $1,000,000) 21 (Design and Contingencies - $1,800,000) 22 (v) Parking facility, Lehigh County 23 (A) Acquire property and construct new 24 parking facility, Allentown 14,950,000 25 (Base Project Allocation - $12,000,000) 26 (Land Allocation - $1,000,000) 27 (Design and Contingencies - $1,950,000) 28 Section 11. Itemization of State forestry bridge projects. 29 Projects in the category of State forestry bridge projects to 30 be constructed by the Department of Conservation and Natural 20050H2317B3325 - 114 -
1 Resources, it successors or assigns and to be financed by oil 2 company franchise tax revenues pursuant to 75 Pa.C.S. § 3 9502(a)(2)(iv) (relating to imposition of tax) are hereby 4 itemized, together with their respective estimated costs, as 5 follows: 6 Total 7 Project 8 Project Allocation 9 (1) Centre County 10 (i) Forest District 9 11 (A) Replacement of bridge at North Run 12 Road over Smays Run 300,000 13 (B) Replacement of Bridge No. 9-0028 at 14 Shirks Road over Black Moshannon Creek 300,000 15 (ii) Forest District 10 16 (A) Replacement of Bridge No. 10-0029 at 17 State Line Road over Beauty Run 300,000 18 (2) Clearfield County 19 (i) Forest District 9 20 (A) Replacement of bridge at Gordon Road 21 over Anderson Creek 300,000 22 (B) Replacement of bridge at Reservoir 23 Road over Upper Three Run 300,000 24 (C) Replacement of Bridge Nos. 9-0013, 9- 25 9914 and 9-0016 900,000 26 (3) Clinton County 27 (i) Forest District 10 28 (A) Replacement of Bridge No. 10-0040 at 29 Birch Island Road over Amos Branch 300,000 30 (B) Replacement of Bridge No. 10-0046 at 20050H2317B3325 - 115 -
1 Mill Run Road over Mill Run 300,000 2 (4) Elk County 3 (i) Forest District 9 4 (A) Replacement of Bridge No. 9-0012 300,000 5 (ii) Forest District 13 6 (A) Replacement of bridge, Ford Crossing, 7 at North Fork of Straight Creek 300,000 8 (B) Replacement of Bridge No. 13-9005 at 9 Dents Run Road over Bear Hollow 200,000 10 (C) Replacement of Bridge No. 13-9006 at 11 Dents Run Road over Weatherboard Run 200,000 12 (D) Replacement of Bridge No. 13-9007 at 13 East Hicks Run Road over Barr Hollow 200,000 14 (5) Huntingdon County 15 (i) Forest District 5 16 (A) Replacement of three culverts along 17 Bridge Nos. 05-0025 and 05-0009 at Pine 18 Swamp Road over Laurel and Little 19 Shingletown Run 200,000 20 (6) Mifflin County 21 (i) Forest District 5 22 (A) Replacement of Bridge No. 05-0056 at 23 Lingle Valley Road over Laurel Creek 200,000 24 (7) Tioga County 25 (i) Forest District 16 26 (A) Replacement of Bridge No. 16-0001 at 27 Spoor Hollow Road over Norris Brook 300,000 28 (B) Replacement of Bridge No. 16-0014 at 29 Cedar Mountain over Cedar Run 200,000 30 Section 12. Limited waiver of local requirements. 20050H2317B3325 - 116 -
1 The limitation on Department of Transportation funding of
2 capital projects under 74 Pa.C.S. § 1302(4) (relating to program
3 authorizations) shall be totally waived for the capital projects
4 in the category of transportation assistance projects for mass
5 transit contained in section 5(a)(12)(iii) and (iv).
6 Section 13. Debt authorization.
7 (a) Public improvements.--The Governor, Auditor General and
8 State Treasurer are hereby authorized and directed to borrow
9 from time to time in addition to any authorization heretofore or
10 hereafter enacted, on the credit of the Commonwealth, subject to
11 the limitations provided in the current capital budget, money
12 not exceeding in the aggregate the sum of $924,546,000 <--
13 $1,603,646,000 as may be found necessary to carry out the <--
14 acquisition and construction of the public improvement projects
15 specifically itemized in a capital budget.
16 (b) Furniture and equipment.--The Governor, Auditor General
17 and State Treasurer are hereby authorized and directed to borrow
18 from time to time in addition to any authorization heretofore or
19 hereafter enacted, on the credit of the Commonwealth, subject to
20 the limitations provided in the current capital budget, money
21 not exceeding in the aggregate the sum of $41,186,000 as may be
22 found necessary to carry out the public improvement projects
23 consisting of the acquisition of original movable furniture and
24 equipment specifically itemized in a capital budget.
25 (c) Transportation assistance.--The Governor, Auditor
26 General and State Treasurer are hereby authorized and directed
27 to borrow from time to time in addition to any authorization
28 heretofore or hereafter enacted, on the credit of the
29 Commonwealth, subject to the limitations provided in the current
30 capital budget, money not exceeding in the aggregate the sum of
20050H2317B3325 - 117 -
1 $968,799,000 $1,067,426,000 as may be found necessary to carry <-- 2 out the acquisition and construction of the transportation 3 assistance projects specifically itemized in a capital budget. 4 (d) Redevelopment assistance.--Subject to the limitation in 5 section 317(b) of the act of February 9, 1999 (P.L.1, No.1), 6 known as the Capital Facilities Debt Enabling Act, the Governor, 7 Auditor General and State Treasurer are hereby authorized and 8 directed to borrow from time to time in addition to any 9 authorization heretofore or hereafter enacted, on the credit of 10 the Commonwealth, subject to the limitations provided in the 11 current capital budget, money not exceeding in the aggregate the 12 sum of $1,977,410,000 $2,092,860,000 as may be found necessary <-- 13 to carry out the redevelopment assistance and the redevelopment 14 assistance capital projects specifically itemized in a capital 15 budget. 16 (e) Flood control.--The Governor, Auditor General and State 17 Treasurer are hereby authorized and directed to borrow from time 18 to time in addition to any authorization heretofore or hereafter 19 enacted, on the credit of the Commonwealth, subject to the 20 limitations provided in the current capital budget, money not 21 exceeding in the aggregate the sum of $43,250,000 as may be 22 found necessary to carry out the acquisition and construction of 23 the flood control projects specifically itemized in a capital 24 budget. 25 (f) Motor License Fund projects.--The Governor, Auditor 26 General and State Treasurer are hereby authorized and directed 27 to borrow from time to time in addition to any authorization 28 heretofore or hereafter enacted, on the credit of the 29 Commonwealth, subject to the limitations provided in the current 30 capital budget, money not exceeding in the aggregate the sum of 20050H2317B3325 - 118 -
1 $66,125,000 as may be found necessary to carry out the
2 acquisition and construction of the Motor License Fund projects
3 specifically itemized in a capital budget.
4 Section 14. Issue of bonds.
5 The indebtedness authorized in this act shall be incurred
6 from time to time and shall be evidenced by one or more series
7 of general obligation bonds of the Commonwealth in such
8 aggregate principal amount for each series as the Governor, the
9 Auditor General and the State Treasurer shall determine, but the
10 latest stated maturity date shall not exceed the estimated
11 useful life of the projects being financed as stated in section
12 13.
13 Section 15. Estimated useful life and term of debt.
14 (a) Estimated useful life.--The General Assembly states that
15 the estimated useful life of the public improvement projects
16 itemized in this act is as follows:
17 (1) Public improvement projects, 30 years.
18 (2) Furniture and equipment projects, 10 years.
19 (3) Transportation assistance projects:
20 (i) Rolling stock, 15 years.
21 (ii) Passenger buses, 12 years.
22 (iii) Furniture and equipment, 10 years.
23 (iv) All others, 30 years.
24 (b) Term of debt.--The maximum term of the debt authorized
25 to be incurred under this act is 30 years.
26 Section 16. Appropriations.
27 (a) Public improvements.--The net proceeds of the sale of
28 the obligations authorized in this act are hereby appropriated
29 from the Capital Facilities Fund to the Department of General
30 Services in the maximum amount of $924,546,000 $1,603,646,000 to <--
20050H2317B3325 - 119 -
1 be used by it exclusively to defray the financial cost of the
2 public improvement projects specifically itemized in a capital
3 budget. After reserving or paying the expense of the sale of the
4 obligation, the State Treasurer shall pay to the Department of
5 General Services the moneys as required and certified by it to
6 be legally due and payable.
7 (b) Furniture and equipment.--The net proceeds of the sale
8 of the obligations authorized in this act are hereby
9 appropriated from the Capital Facilities Fund to the Department
10 of General Services in the maximum amount of $41,186,000 to be
11 used by it exclusively to defray the financial cost of the
12 public improvement projects consisting of the acquisition of
13 original movable furniture and equipment specifically itemized
14 in a capital budget. After reserving or paying the expenses of
15 the sale of the obligation, the State Treasurer shall pay to the
16 Department of General Services the moneys as required and
17 certified by it to be legally due and payable.
18 (c) Transportation assistance.--The net proceeds of the sale
19 of the obligations authorized in this act are hereby
20 appropriated from the Capital Facilities Fund to the Department
21 of Transportation in the maximum amount of $968,799,000 <--
22 $1,067,426,000 to be used by it exclusively to defray the <--
23 financial cost of the transportation assistance projects
24 specifically itemized in a capital budget. After reserving or
25 paying the expense of the sale of the obligation, the State
26 Treasurer shall pay to the Department of Transportation the
27 moneys as required and certified by it to be legally due and
28 payable.
29 (d) Redevelopment assistance.--The net proceeds of the sale
30 of the obligations authorized in this act are hereby
20050H2317B3325 - 120 -
1 appropriated from the Capital Facilities Fund to the Department
2 of Community and Economic Development in the maximum amount of
3 $1,977,410,000 $2,092,860,000 to be used by it exclusively to <--
4 defray the financial cost of the redevelopment assistance and
5 redevelopment assistance capital projects specifically itemized
6 in a capital budget. After reserving or paying the expenses of
7 the sale of the obligation, the State Treasurer shall pay to the
8 Department of Community and Economic Development the moneys as
9 required and certified by it to be legally due and payable.
10 (e) Flood control.--The net proceeds of the sale of the
11 obligations authorized in this act are hereby appropriated from
12 the Capital Facilities Fund to the Department of Environmental
13 Protection in the maximum amount of $43,250,000 to be used by it
14 exclusively to defray the financial cost of the flood control
15 projects specifically itemized in a capital budget. After
16 reserving or paying the expense of the sale of the obligation,
17 the State Treasurer shall pay to the Department of Environmental
18 Protection the moneys as required and certified by it to be
19 legally due and payable.
20 (f) Motor License Fund projects.--The net proceeds of the
21 sale of the obligations authorized in this act are hereby
22 appropriated from the Motor License Fund to the Department of
23 Transportation in the maximum amount of $66,125,000 to be used
24 by it exclusively to defray the financial cost of the Motor
25 License Fund projects specifically itemized in a capital budget.
26 After reserving or paying the expense of the sale of the
27 obligation, the State Treasurer shall pay to the Department of
28 Transportation the moneys as required and certified by it to be
29 legally due and payable.
30 Section 17. Federal funds.
20050H2317B3325 - 121 -
1 (a) Projects itemized in this act.--In addition to those 2 funds appropriated in section 15, all moneys received from the 3 Federal Government for the projects specifically itemized in 4 this act are also hereby appropriated for those projects. 5 (b) Projects not requiring itemization.--Construction 6 projects which are totally federally funded but which are to be 7 administered by the Department of General Services are hereby 8 authorized. 9 Section 18. Editorial changes. 10 In editing and preparing this act for printing following the 11 final enactment, the Legislative Reference Bureau shall insert 12 or revise letters or numbers for projects where the letters or 13 numbers are missing or require revision. The bureau shall also 14 revise the total monetary amounts for the total authorization, 15 debt authorization, appropriations and departmental totals as 16 necessary to agree with the total monetary amounts of the 17 projects. 18 Section 19. Effective date. 19 This act shall take effect immediately. L7L72SFL/20050H2317B3325 - 122 -